WorldWideScience

Sample records for departmental assessment plan

  1. Prospects offered by the departmental plans inspection; Les perspectives offertes par la revision des plans departementaux

    Energy Technology Data Exchange (ETDEWEB)

    Thauvin, Ph.

    2000-07-01

    In the framework of the departmental plans inspection, a detailed document is presented on the domestic and industrial wastes management. These plans forecast an increase of the recycling facing the incineration, a mastership of the costs, a better application of the regulations and a campaign of public information. The indicators of control and the main points of these plans are discussed, supported by tables and definitions. (A.L.B.)

  2. DEPARTMENTALIZATION OF READING IN ELEMENTARY AND SECONDARY SCHOOLS.

    Science.gov (United States)

    STOWE, ELAINE H.

    DEPARTMENTALIZATION IS A FORM OF GROUPING FOR INSTRUCTION, AN ADMINISTRATIVE METHOD FOR ASSIGNING PUPILS TO TEACHERS IN SOME PLANNED MANNER. SOME PRECEDENTS FOR THE RECENT REVIVAL OF DEPARTMENTALIZATION IN THE ELEMENTARY GRADES ARE CITED. THE FOLLOWING EXAMPLES OF DEPARTMENTALIZATION ORGANIZATION ARE DISCUSSED IN DETAIL--A PROGRAM INVOLVING…

  3. Departmental plans of domestic wastes management - evaluation 2002; Plans departementaux d'elimination des dechets menager assimiles - bilan 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-03-01

    The departmental plans of domestic wastes management are official documents which manage the actions needed to realize the legislative and regulation objectives concerning the domestic wastes and related wastes. A first evaluation has been realized in 1997 for 47 edited plans. In the context of the new wastes policy a new evaluation has been realized by the ADEME in 2002 for 98 plans. It provides the methodology of the study, the analysis of the plans, the sites and management of wastes, economic data, the equipment and investments. (A.L.B.)

  4. DEPARTMENTALIZATION IN ELEMENTARY SCHOOLS.

    Science.gov (United States)

    American Association of School Administrators, Washington, DC.

    THE RESULTS OF A SURVEY CONCERNED WITH DEPARTMENTALIZATION IN ELEMENTARY SCHOOLS ARE REPORTED IN STATISTICAL TABLES WHICH ARE ACCOMPANIED BY DESCRIPTIVE COMMENTARY. FOR THE PURPOSE OF THE SURVEY, THE DEFINITION OF DEPARTMENTALIZATION IS RESTRICTED TO INCLUDE ONLY THOSE SITUATIONS IN WHICH STUDENTS RECEIVE INSTRUCTION IN THE VARIOUS ACADEMIC…

  5. Self-Evaluation for the Departmental Chairperson

    Science.gov (United States)

    Oliverio, Mary Ellen

    1976-01-01

    The importance of a candid evaluation of the departmental chairperson's own performance is discussed. Questions are provided as an aid in probing some of the critical concerns of a departmental staff. (HD)

  6. 18 CFR 367.26 - Departmental classification.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Departmental classification. 367.26 Section 367.26 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... ACT General Instructions § 367.26 Departmental classification. Salaries and wages and all other costs...

  7. Current developments in departmental PACS for ultrasound.

    Science.gov (United States)

    Grenier, L E; Eng, P

    1995-01-01

    1. INTRODUCTION TO DEPARTMENTAL PACS. Full or partial Departmental PACS is generally taken to mean an image management system focused on serving the needs of a specific modality or modality application. It will provide a modality specific means of image acquisition, specialized redisplay of images, distribution, and local long term storage of images. A Departmental PACS can be considered in isolation or as a component in a distributed Radiology PACS which consists of one or more departmental work groups on a back bone, potentially with shared resources. 2. DEPARTMENTAL PACS Issues Implementation of a Departmental PACS requires an in-depth knowledge of departmental clinical practice and work flow in all affected areas in the department, including patient intake, image collection, data routing, retrieval of previous image data, reporting, and long term data management and storage. Optimization of modality specific image display systems requires significant involvement from representative physician users. System architectures and user interfaces must be flexible enough to support the span of variation in clinical practice encountered in the site. A departmental PACS should offer a variety of "open" communications interfaces, both local and wide area, recognizing that outreach efforts are often driven by specific imaging departments. Interfaces to other departmental PAC systems and other information systems must be considered in order to facilitate institutions developing "Best of Breed" PACS systems. As hospitals move toward the integrated electronic medical record, means need to exist for a client process launched from a physician desktop to acquire images and/or reports from a departmental system. At minimum, HIS/RIS interfaces need to be considered to minimize re-keying of data and reduce data entry errors. 3. DESIGN OBJECTIVES FOR ALI ULTRAPACS. The key objectives were to design a product which could function either as a free standing PACS or as a departmental

  8. Evaluating the Impact of Departmentalization on Elementary School Students

    Science.gov (United States)

    Chang, Florence C.; Muñoz, Marco A.; Koshewa, Sheila

    2008-01-01

    The increasing accountability demands are leading some districts to departmentalize or consider departmentalizing at the elementary school level (Delviscio & Muffs, 2007). Departmentalization allows teachers to specialize and teach one content area in-depth which may, in turn, lead to higher accountability test scores. Although, due to…

  9. Institutional and Departmental Cultures: The Relationship Between Teaching and Research.

    Science.gov (United States)

    Austin, Ann E.

    1996-01-01

    The influence of institutional and departmental cultures on the relationship between college teaching and research is discussed, and suggestions for assessing these factors and nurturing a positive relationship between them are made. Approaches include making reward systems more equitable, strengthening administrative leadership, encouraging…

  10. Departmental Appeals Board Decisions

    Data.gov (United States)

    U.S. Department of Health & Human Services — Decisions issued by the Chair and Board Members of the Departmental Appeals Board concerning determinations in discretionary, project grant programs, including...

  11. 78 FR 75447 - Senior Executive Service; Departmental Performance Review Board

    Science.gov (United States)

    2013-12-11

    ... DEPARTMENT OF THE TREASURY Senior Executive Service; Departmental Performance Review Board AGENCY: Treasury Department. ACTION: Notice of members of the Departmental Performance Review Board (PRB). SUMMARY: Pursuant to 5 U.S.C. 4314(c)(4), this notice announces the appointment of members of the Departmental PRB...

  12. 76 FR 69798 - Senior Executive Service; Departmental Performance Review Board

    Science.gov (United States)

    2011-11-09

    ... DEPARTMENT OF THE TREASURY Senior Executive Service; Departmental Performance Review Board AGENCY: Treasury Department. ACTION: Notice of members of the Departmental Performance Review Board (PRB). SUMMARY: Pursuant to 5 U.S.C. 4314(c)(4), this notice announces the appointment of members of the Departmental PRB...

  13. Self-Contained to Departmentalized: How Reading Habits Changed

    Science.gov (United States)

    Lamme, Linda Leonard

    1976-01-01

    Examined the reading habits of four 4th grade classes before and after a changeover from self-contained to departmentalized instruction. Results indicated a slightly lower mean number of books read and far less variation among classes in the number of books read after departmentalization. (JMB)

  14. Flexibility First, Then Standardize: A Strategy for Growing Inter-Departmental Systems.

    Science.gov (United States)

    á Torkilsheyggi, Arnvør

    2015-01-01

    Any attempt to use IT to standardize work practices faces the challenge of finding a balance between standardization and flexibility. In implementing electronic whiteboards with the goal of standardizing inter-departmental practices, a hospital in Denmark chose to follow the strategy of "flexibility first, then standardization." To improve the local grounding of the system, they first focused on flexibility by configuring the whiteboards to support intra-departmental practices. Subsequently, they focused on standardization by using the white-boards to negotiate standardization of inter-departmental practices. This paper investigates the chosen strategy and finds: that super users on many wards managed to configure the whiteboard to support intra-departmental practices; that initiatives to standardize inter-departmental practices improved coordination of certain processes; and that the chosen strategy posed a challenge for finding the right time and manner to shift the balance from flexibility to standardization.

  15. Telling Our Story: A Case Study of a Collaborative Departmental Blog at Syracuse University Libraries

    Science.gov (United States)

    Rauh, Anne E.; McReynolds, Stephanie J. H.

    2016-01-01

    This case study will take readers through the planning and publication process of a collaborative departmental library blog at Syracuse University, which is a large private, non-profit research intensive university located in central New York State. It will provide an overview of the history of the project and the mission of the blog. It will…

  16. 75 FR 68668 - Senior Executive Service; Departmental Performance Review Board

    Science.gov (United States)

    2010-11-08

    ... DEPARTMENT OF THE TREASURY Senior Executive Service; Departmental Performance Review Board AGENCY: Treasury Department. ACTION: Notice of members of the Departmental Offices Performances Review Board. SUMMARY: Pursuant to 5 U.S.C. 4314(c)(4), this notice announces the appointment of members of the...

  17. 75 FR 68669 - Senior Executive Service; Departmental Performance Review Board

    Science.gov (United States)

    2010-11-08

    ... DEPARTMENT OF THE TREASURY Senior Executive Service; Departmental Performance Review Board AGENCY: Treasury Department. ACTION: Notice. SUMMARY: Pursuant to 5 U.S.C. 4314(c)(4), this notice announces the appointment of members of the Departmental PRB. The purpose of this PRB is to review and make recommendations...

  18. 76 FR 69797 - Senior Executive Service Departmental Offices Performance Review Board.

    Science.gov (United States)

    2011-11-09

    ... DEPARTMENT OF THE TREASURY Senior Executive Service Departmental Offices Performance Review Board. AGENCY: Treasury Department. ACTION: Notice of members of the Departmental Offices Performances Review Board. SUMMARY: Pursuant to 5 U.S.C. 4314(c)(4), this notice announces the appointment of members of the...

  19. A Departmental Cost-Effectiveness Model.

    Science.gov (United States)

    Holleman, Thomas, Jr.

    In establishing a departmental cost-effectiveness model, the traditional cost-effectiveness model was discussed and equipped with a distant and deflation equation for both benefits and costs. Next, the economics of costing was examined and program costing procedures developed. Then, the model construct was described as it was structured around the…

  20. 22 CFR 161.12 - Environmental effects abroad of major departmental actions.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Environmental effects abroad of major... Requirements of NEPA § 161.12 Environmental effects abroad of major departmental actions. Departmental officials shall analyze actions under their cognizance with due regard for the environmental effects in the...

  1. 41 CFR 128-1.5007 - Reproduction of departmental and bureau seals.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Reproduction of departmental and bureau seals. 128-1.5007 Section 128-1.5007 Public Contracts and Property Management Federal... and Responsibilities for Personal Property Management § 128-1.5007 Reproduction of departmental and...

  2. Elementary Teachers' Experiences and Perceptions of Departmentalized Instruction: A Case Study

    Science.gov (United States)

    Strohl, Alecia; Schmertzing, Lorraine; Schmertzing, Richard

    2014-01-01

    This case study investigated elementary teachers' experiences and perceptions during a trial year of departmentalized instruction in a rural south Georgia elementary school. To inform their decision about whole-school departmentalization for the future, school administrators appointed twelve first through third grade teachers to pilot the…

  3. Departmentalization and Twenty-First Century Skills

    Science.gov (United States)

    Watts, Toy Coles

    2012-01-01

    The purpose of this study was to investigate the relationship between school organizational style and student outcomes. The research questions that guided this study were, "Is there a difference in mathematical performance of fourth graders who receive departmentalized instruction as compared to fourth grade students who receive…

  4. Elementary Teachers' Experiences of Departmentalized Instruction and Its Impact on Student Affect

    Science.gov (United States)

    Minott, Robert Charles

    2016-01-01

    The purpose of this qualitative dissertation was to explore the lived experiences of departmentalized elementary teachers, Grades 1-3, and how they addressed their students' affective needs. The main research question of the study was how do elementary school teachers perceive departmentalized instruction and describe their experiences of this…

  5. The Benefits of Departmentalization in Upper Elementary Grades for Students and Teachers

    Science.gov (United States)

    Johnson, Malissa Lee

    2013-01-01

    This study addressed the benefits of departmentalization in upper elementary grades for students and teachers. The variables of gender and classroom structure (departmentalized versus self-contained) were considered for student participants (n = 125). Results for students were evaluated on pre-test and post-test data using the following measures:…

  6. Departmentalization and Organizational Context: The Experience of the University of Guadalajara

    Directory of Open Access Journals (Sweden)

    Adrián Acosta Silva

    2005-05-01

    Full Text Available This work consists of an evaluation of the experience of organizational reform and academic departmentalization at a Mexican public university, the University of Guadalajara (U. of G., occurred in the period of 1994-2005. It is a research carried out from the perspective of the institutional change analysis, which obeys the interest of carrying out a rigorous evaluation of the process, after 11 years of its institutional operation. From a reconstruction of the context that gave origin and sense to the reform proposal and to the idea of academic departmentalization, some of the results and conditions in which the academic departments of the U. of G operate are analyzed. Finally, some of the problems and challenges that face the departmental structure in this institutional experience are identified.

  7. The Departmentalization of the ESL Program.

    Science.gov (United States)

    Bolton, John K.

    A review of prevailing patterns of sponsorship of college and university English as a second language (ESL) programs indicates that in community colleges, they tend to be housed in English departments. In four-year institutions they are generally in semi-autonomous units or institutes. The argument for departmental sponsorship is based on data…

  8. The Effect of Departmentalization on the Reading Achievement of Sixth-Grade Students.

    Science.gov (United States)

    Harris, Mary B.

    A study examined whether departmentalization affected the reading achievement of sixth-grade students attending a Chicago public school. A random sample of 30 students was chosen from a group of 53 who received instruction in a departmentalized program. A second random sample of 30 was selected from a total of 54 students who received instruction…

  9. 15 CFR 23.3 - Plan.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Plan. 23.3 Section 23.3 Commerce and... MISSING CHILDREN § 23.3 Plan. (a) The Department of Commerce will supplement and expand the national... biannual meetings of departmental representatives to discuss the current plan and recommendations for...

  10. The Form is the Bottom Line, Yes, But Sometimesthe Bottom Line Alters the Form: A Reflection on the Departmental Process at UAM

    Directory of Open Access Journals (Sweden)

    Manuel Gil Antón

    2005-05-01

    Full Text Available In this work the departmental organization at higher education institutions is commented, not as a –better or worse– plan with upper intrinsic values, but as an organizational structure that, depending on its purpose, can offer an opportunity or excuses for organizational change. The experience of the Metropolitan Autonomous University is described (UAM, Mexico, as an institution that since its origin was born with a departmental structure and with a dot-matrix service of its departments. This work offers data of the first 13 years of life (1974-1987 of the Department of Sociology in UAM, at Azcapotzalco, as a sample of this kind of system. In the example, general characteristics of age, working conditions al income, academic degree al income, institution where were formed and their labor antecedents are shown. Also, the difficulties faced initially by the educators of this institution, due to their youth, are described; as well as the nostalgia of some departments about adopting traditional systems, used in practice. This is a work that offers suggestions for educational institutions who are interested in adopting the departmental model.

  11. Assessing Assessment Texts: Where Is Planning?

    Science.gov (United States)

    Fives, Helenrose; Barnes, Nicole; Dacey, Charity; Gillis, Anna

    2016-01-01

    We conducted a content analysis of 27 assessment textbooks to determine how assessment planning was framed in texts for preservice teachers. We identified eight assessment planning themes: alignment, assessment purpose and types, reliability and validity, writing goals and objectives, planning specific assessments, unpacking, overall assessment…

  12. Interdisciplinary Team Teaching versus Departmentalization in Middle Schools.

    Science.gov (United States)

    Alspaugh, John W.; Harting, Roger D.

    1998-01-01

    Studied the effects of interdisciplinary teaming versus departmentalization on student achievement in middle schools. Found no significant differences for reading, math, science, and social studies achievement. Results suggest that team teaching merits further investigation as a potential strategy for mediating the student achievement loss…

  13. A Computer-Aided Bibliometrics System for Journal Citation Analysis and Departmental Core Journal Ranking List Generation

    Directory of Open Access Journals (Sweden)

    Yih-Chearng Shiue

    2004-12-01

    Full Text Available Due to the tremendous increase and variation in serial publications, faculties in department of university are finding it difficult to generate and update their departmental core journal list regularly and accurately, and libraries are finding it difficult to maintain their current serial collection for different departments. Therefore, the evaluation of a departmental core journal list is an important task for departmental faculties and librarians. A departmental core journal list not only helps departments understand research performances of faculties and students, but also helps librarians make decisions about which journals to retain and which to cancel. In this study, a Computer-Aided Bibliometrics System was implemented and two methodologies (JCDF and LibJF were proposed in order to generate a departmental core journal ranking list and make the journal citation analysis. Six departments were taken as examples, with MIS as the major one. One journal citation pattern was found and the ratio of Turning point-to-No. journal was always around 0.07 among the 10 journals and 6 departments. After comparing with four methodologies via overlapping rate and standard deviation distances, the two proposed methodologies were shown to be better than questionnaire and library subscription method.

  14. NRPB corporate plan

    International Nuclear Information System (INIS)

    Clarke, Roger

    1995-01-01

    As with all non-departmental public bodies, the National Radiological Protection Board is required to prepare a Corporate Plan each year. The Plan for 1995/1996 to 1999/2000 is now available as a Board report; extracts from the introductory section are given here. They deal with the Board's statutory duty to provide advice and conduct research and with its power to provide services, all in relation to ionising and non-ionising radiations. (author)

  15. Pre-Service Teachers' Perceptions of Departmentalization of Elementary Schools

    Science.gov (United States)

    Liu, Fuchang

    2011-01-01

    This paper discusses the advantages and disadvantages of departmentalization of elementary schools, with an emphasis on teaching mathematics, as perceived by preservice teachers who shared their opinions through online discussion. Advantages include teachers' enthusiasm about and focused attention on the specialized area and students' easier…

  16. IT services in a completely digitized radiological department: value and benefit of an in-house departmental IT group

    International Nuclear Information System (INIS)

    Treitl, M.; Wirth, S.; Lucke, A.; Rieger, J.; Pfeifer, K.J.; Reiser, M.; Villain, S.

    2005-01-01

    To analyze the benefit of a departmental IT group in comparison to support by hospital IT groups or system manufacturers in a completely digitized radiological department. The departmental IT group comprises a fulltime IT specialist, two student assistants and four clinical employees participating 1 day/week. For 18 months IT problems were quantified and specified according to urgency, responsibility and affected system by use of an intranet-based reporting system. For each IT service provider the performance and duration of problem solution was evaluated. In 18 months 3,234 IT problems emerged. 88.7% were solved by the departmental IT group. In 474 cases (14.7%) a solution within 2 h was required. The departmental IT group solved 35.8% within 30 min, system manufacturers needed 18 h 38 min in mean. The departmental IT group solved 90.2% of the problems within a time limit. System manufacturers met the limit in 60.1% with a mean duration of 7 days 21 h. In 6.7% of the cases, support by system manufacturers was indispensable. A considerable proportion of IT problems in completely digitized radiological departments can be solved by a departmental IT group, providing a fast and cost-efficient first-level IT support with effective prevention of major breaks in the workflow. In a small number of cases support by system manufacturers remains necessary. (orig.)

  17. Elementary School Organization: Self-Contained and Departmentalized Classroom Structures.

    Science.gov (United States)

    Des Moines Public Schools, IA.

    Surveys were conducted to investigate contemporary thought regarding organizational practices at the elementary level, with particular attention to identifying the extent to which departmentalization was supported by research and actually employed in 24 elementary schools in the Midwest and in 41 Des Moines elementary schools. Four committees…

  18. The Role of Departmental Leadership for Professional Learning Communities

    Science.gov (United States)

    Vanblaere, Bénédicte; Devos, Geert

    2018-01-01

    Purpose: Department heads play a pivotal role in the functioning of departments in secondary schools. However, quantitative research about the role of departmental leadership for the development of professional learning communities (PLCs) in subject departments in secondary schools remains scarce. As PLCs are seen as promising contexts for…

  19. Faculty Agency: Departmental Contexts That Matter in Faculty Careers

    Science.gov (United States)

    Campbell, Corbin M.; O'Meara, KerryAnn

    2014-01-01

    In a modern context of constrained resources and high demands, faculty exert agency to strategically navigate their careers (Baez 2000a; Neumann et al. 2006). Guided by the O'Meara et al. (2011) framework on agency in faculty professional lives, this study used Structural Equation Modeling to investigate which departmental factors…

  20. FY 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  1. 1998: BMBF expenditures for energy research. Draft of the departmental federal budget No. 30

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    Departmental budget No. 30 in the 1998 draft federal budget covers the activities of the Federal Ministry for Education, Science, Research and Technology (BMBF). Its level of DM 14 950 million represents a 0,9% increase from the funds earmarked for the current year of 1997. DM 70 million is to be spent on safety research for nuclear plants, and DM 228 million has been planned for decommissioning and demolition of nuclear experimental and demonstration plants. The operation of, and investments into, the research centers are funded to the tune of DM 1307 million and DM 339 million, respectively. Institutions of basic research will receive DM 434 million, and renewable energies, economical energy uses, conversion and combustion technologies will be funded in the amount of DM 238 million. (orig.) [de

  2. SU-D-BRD-04: The Impact of Automatic Radiation Therapy Plan Checks in Treatment Planning

    International Nuclear Information System (INIS)

    Gopan, O; Yang, F; Ford, E

    2015-01-01

    Purpose: The physics plan check verifies various aspects of a treatment plan after dosimetrists have finished creating the plan. Some errors in the plan which are caught by the physics check could be caught earlier in the departmental workflow. The purpose of this project was to evaluate a plan checking script that can be run within the treatment planning system (TPS) by the dosimetrists prior to plan approval and export to the record and verify system. Methods: A script was created in the Pinnacle TPS to automatically check 15 aspects of a plan for clinical practice conformity. The script outputs a list of checks which the plan has passed and a list of checks which the plan has failed so that appropriate adjustments can be made. For this study, the script was run on a total of 108 plans: IMRT (46/108), VMAT (35/108) and SBRT (27/108). Results: Of the plans checked by the script, 77/108 (71%) failed at least one of the fifteen checks. IMRT plans resulted in more failed checks (91%) than VMAT (51%) or SBRT (63%), due to the high failure rate of an IMRT-specific check, which checks that no IMRT segment < 5 MU. The dose grid size and couch removal checks caught errors in 10% and 14% of all plans – errors that ultimately may have resulted in harm to the patient. Conclusion: Approximately three-fourths of the plans being examined contain errors that could be caught by dosimetrists running an automated script embedded in the TPS. The results of this study will improve the departmental workflow by cutting down on the number of plans that, due to these types of errors, necessitate re-planning and re-approval of plans, increase dosimetrist and physician workload and, in urgent cases, inconvenience patients by causing treatment delays

  3. 31 CFR Appendix A to Subpart C of... - Departmental Offices

    Science.gov (United States)

    2010-07-01

    ... requests to amend records for records maintained by the Departmental Offices will be made by the head of... Treasury, Room 3000, Main Treasury Building, 1500 Pennsylvania Avenue, NW., Washington, DC 20220. 7. Annual... guardian of any individual will be required to provide adequate proof of legal relationship before such...

  4. Managerial span of control: a pilot study comparing departmental complexity and number of direct reports.

    Science.gov (United States)

    Merrill, Katreena Collette; Pepper, Ginette; Blegen, Mary

    2013-09-01

    Nurse managers play pivotal roles in hospitals. However, restructuring has resulted in nurse managers having wider span of control and reduced visibility. The purpose of this pilot study was to compare two methods of measuring span of control: departmental complexity and number of direct reports. Forty-one nurse managers across nine hospitals completed The Ottawa Hospital Clinical Manager Span of Control Tool (TOH-SOC) and a demographic survey. A moderate positive relationship between number of direct reports and departmental complexity score was identified (r=.49, p=managers' responsibility. Copyright © 2013 Longwoods Publishing.

  5. 75 FR 44265 - Office of the Assistant Secretary for Planning and Evaluation; Request for Comments on the...

    Science.gov (United States)

    2010-07-28

    ... planning process is an opportunity for the Department to further refine and strengthen the strategic goal... for Planning and Evaluation; Request for Comments on the Departmental FY 2010-2015 Strategic Plan... and Human Services Draft FY 2010-2015 Strategic Plan is provided as part of the strategic planning...

  6. Implementation of a departmental picture archiving and communication system: a productivity and cost analysis.

    Science.gov (United States)

    Macyszyn, Luke; Lega, Brad; Bohman, Leif-Erik; Latefi, Ahmad; Smith, Michelle J; Malhotra, Neil R; Welch, William; Grady, Sean M

    2013-09-01

    Digital radiology enhances productivity and results in long-term cost savings. However, the viewing, storage, and sharing of outside imaging studies on compact discs at ambulatory offices and hospitals pose a number of unique challenges to a surgeon's efficiency and clinical workflow. To improve the efficiency and clinical workflow of an academic neurosurgical practice when evaluating patients with outside radiological studies. Open-source software and commercial hardware were used to design and implement a departmental picture archiving and communications system (PACS). The implementation of a departmental PACS system significantly improved productivity and enhanced collaboration in a variety of clinical settings. Using published data on the rate of information technology problems associated with outside studies on compact discs, this system produced a cost savings ranging from $6250 to $33600 and from $43200 to $72000 for 2 cohorts, urgent transfer and spine clinic patients, respectively, therefore justifying the costs of the system in less than a year. The implementation of a departmental PACS system using open-source software is straightforward and cost-effective and results in significant gains in surgeon productivity when evaluating patients with outside imaging studies.

  7. The Woman Engineering Academic: An Investigation of Departmental and Institutional Environments.

    Science.gov (United States)

    McKendall, Sherron Benson

    2000-01-01

    Interviewed women engineering faculty at two universities to determine their experiences and perceptions of departmental and institutional environments. Most participants had experienced some type of isolation or singling out due to gender. Some questioned whether they were overreacting. Many had difficulty balancing home and work lives.…

  8. Multiage Assessment: One School's Plan.

    Science.gov (United States)

    Arnold, Sue Beth; Kidwell, Barbara; Rossman, David

    1998-01-01

    Describes one elementary school's multiage assessment plan. Describes how standards were developed, and describes the assessment plan's guiding element: the progress report arranged as a continuum of objectives that serve as a goal indicator and a reporting mechanism. Discusses how objectives are assessed, record keeping and documentation, and the…

  9. [Implementation of a safety and health planning system in a teaching hospital].

    Science.gov (United States)

    Mariani, F; Bravi, C; Dolcetti, L; Moretto, A; Palermo, A; Ronchin, M; Tonelli, F; Carrer, P

    2007-01-01

    University Hospital "L. Sacco" had started in 2006 a two-year project in order to set up a "Health and Safety Management System (HSMS)" referring to the technical guideline OHSAS 18001:1999 and the UNI and INAIL "Guidelines for a health and safety management system at workplace". So far, the following operations had been implemented: Setting up of a specific Commission within the Risk Management Committee; Identification and appointment of Departmental Representatives of HSMS; Carrying out of a training course addressed to Workers Representatives for Safety and Departmental Representatives of HSMS; Development of an Integrated Informative System for Prevention and Safety; Auditors qualification; Inspection of the Occupational Health Unit and the Prevention and Safety Service: reporting of critical situations and monitoring solutions adopted. Short term objectives are: Self-evaluation through check-lists of each department; Sharing of the Improvement Plan among the departments of the hospital; Planning of Health and Safety training activities in the framework of the Hospital Training Plan; Safety audit.

  10. Integrating human resources and program-planning strategies.

    Science.gov (United States)

    Smith, J E

    1989-06-01

    The integration of human resources management (HRM) strategies with long-term program-planning strategies in hospital pharmacy departments is described. HRM is a behaviorally based, comprehensive strategy for the effective management and use of people that seeks to achieve coordination and integration with overall planning strategies and other managerial functions. It encompasses forecasting of staffing requirements; determining work-related factors that are strong "motivators" and thus contribute to employee productivity and job satisfaction; conducting a departmental personnel and skills inventory; employee career planning and development, including training and education programs; strategies for promotion and succession, including routes of advancement that provide alternatives to the managerial route; and recruitment and selection of new personnel to meet changing departmental needs. Increased competitiveness among hospitals and a shortage of pharmacists make it imperative that hospital pharmacy managers create strategies to attract, develop, and retain the right individuals to enable the department--and the hospital as a whole--to grow and change in response to the changing health-care environment in the United States. Pharmacy managers would be greatly aided in this mission by the establishment of a well-defined, national strategic plan for pharmacy programs and services that includes an analysis of what education and training are necessary for their successful accomplishment. Creation of links between overall program objectives and people-planning strategies will aid hospital pharmacy departments in maximizing the long-term effectiveness of their practice.

  11. A Study of Career Planning Assessments

    OpenAIRE

    Firkola, Peter

    2007-01-01

    This paper provides an overview of career planning assessments. Background on key career concepts is first introduced. A number of career planning assessments are then examined. These assessments included reviewing ones personal history, interest inventories, values assessments, personality assessments, and aptitude tests. The importance and limitations of these career assessments is then discussed.

  12. Corporate plan 1994/95 to 1998/99

    International Nuclear Information System (INIS)

    1994-04-01

    The National Radiological Protection Board is a public authority established by the Radiological Protection Act 1970. As with all non-departmental public bodies it is required to prepare a Corporate Plan against which its performance and the relevance of its activities to contemporary requirements can be measured. The Board has produced annual Corporate Plans since 1986. In this issue, summary sections on background, objectives, and finances are followed by fifteen sections describing the major areas of work in a structured manner with the Plan objectives, achievements, and alterations set out. Altogether, the Plan shows a good level of attainment and a clear sense of direction. (author)

  13. A retrospective planning analysis comparing intensity modulated radiation therapy (IMRT) to volumetric modulated arc therapy (VMAT) using two optimization algorithms for the treatment of early-stage prostate cancer

    International Nuclear Information System (INIS)

    Elith, Craig A; Dempsey, Shane E; Warren-Forward, Helen M

    2013-01-01

    The primary aim of this study is to compare intensity modulated radiation therapy (IMRT) to volumetric modulated arc therapy (VMAT) for the radical treatment of prostate cancer using version 10.0 (v10.0) of Varian Medical Systems, RapidArc radiation oncology system. Particular focus was placed on plan quality and the implications on departmental resources. The secondary objective was to compare the results in v10.0 to the preceding version 8.6 (v8.6). Twenty prostate cancer cases were retrospectively planned using v10.0 of Varian's Eclipse and RapidArc software. Three planning techniques were performed: a 5-field IMRT, VMAT using one arc (VMAT-1A), and VMAT with two arcs (VMAT-2A). Plan quality was assessed by examining homogeneity, conformity, the number of monitor units (MUs) utilized, and dose to the organs at risk (OAR). Resource implications were assessed by examining planning and treatment times. The results obtained using v10.0 were also compared to those previously reported by our group for v8.6. In v10.0, each technique was able to produce a dose distribution that achieved the departmental planning guidelines. The IMRT plans were produced faster than VMAT plans and displayed improved homogeneity. The VMAT plans provided better conformity to the target volume, improved dose to the OAR, and required fewer MUs. Treatments using VMAT-1A were significantly faster than both IMRT and VMAT-2A. Comparison between versions 8.6 and 10.0 revealed that in the newer version, VMAT planning was significantly faster and the quality of the VMAT dose distributions produced were of a better quality. VMAT (v10.0) using one or two arcs provides an acceptable alternative to IMRT for the treatment of prostate cancer. VMAT-1A has the greatest impact on reducing treatment time

  14. Commentary: Mentoring the mentor: executive coaching for clinical departmental executive officers.

    Science.gov (United States)

    Geist, Lois J; Cohen, Michael B

    2010-01-01

    Departmental executive officers (DEOs), department chairs, and department heads in medical schools are often hired on the basis of their accomplishments in research as well as their skills in administration, management, and leadership. These individuals are also expected to be expert in multiple areas, including negotiation, finance and budgeting, mentoring, and personnel management. At the same time, they are expected to maintain and perhaps even enhance their personal academic standing for the purposes of raising the level of departmental and institutional prestige and for recruiting the next generation of physicians and scientists. In the corporate world, employers understand the importance of training new leaders in requisite skill enhancement that will lead to success in their new positions. These individuals are often provided with extensive executive training to develop the necessary competencies to make them successful leaders. Among the tools employed for this purpose are the use of personal coaches or executive training courses. The authors propose that the use of executive coaching in academic medicine may be of benefit for new DEOs. Experience using an executive coach suggests that this was a valuable growth experience for new leaders in the institution.

  15. Measurable improvement in patient safety culture: A departmental experience with incident learning.

    Science.gov (United States)

    Kusano, Aaron S; Nyflot, Matthew J; Zeng, Jing; Sponseller, Patricia A; Ermoian, Ralph; Jordan, Loucille; Carlson, Joshua; Novak, Avrey; Kane, Gabrielle; Ford, Eric C

    2015-01-01

    Rigorous use of departmental incident learning is integral to improving patient safety and quality of care. The goal of this study was to quantify the impact of a high-volume, departmental incident learning system on patient safety culture. A prospective, voluntary, electronic incident learning system was implemented in February 2012 with the intent of tracking near-miss/no-harm incidents. All incident reports were reviewed weekly by a multiprofessional team with regular department-wide feedback. Patient safety culture was measured at baseline with validated patient safety culture survey questions. A repeat survey was conducted after 1 and 2 years of departmental incident learning. Proportional changes were compared by χ(2) or Fisher exact test, where appropriate. Between 2012 and 2014, a total of 1897 error/near-miss incidents were reported, representing an average of 1 near-miss report per patient treated. Reports were filed by a cross section of staff, with the majority of incidents reported by therapists, dosimetrists, and physicists. Survey response rates at baseline and 1 and 2 years were 78%, 80%, and 80%, respectively. Statistically significant and sustained improvements were noted in several safety metrics, including belief that the department was openly discussing ways to improve safety, the sense that reports were being used for safety improvement, and the sense that changes were being evaluated for effectiveness. None of the surveyed dimensions of patient safety culture worsened. Fewer punitive concerns were noted, with statistically significant decreases in the worry of embarrassment in front of colleagues and fear of getting colleagues in trouble. A comprehensive incident learning system can identify many areas for improvement and is associated with significant and sustained improvements in patient safety culture. These data provide valuable guidance as incident learning systems become more widely used in radiation oncology. Copyright © 2015

  16. Enterprise imaging and multi-departmental PACS

    International Nuclear Information System (INIS)

    Bergh, Bjoern

    2006-01-01

    The aim of this review is to present the status of digital image acquisition and archiving outside of radiology and to describe the technical concepts and possibilities of how a ''radiology'' Picture Archiving and Communication System (PACS) can become a multi-departmental (MD-)PACS. First the principles of system integration technology are explained and illustrated by the description of a typical radiology system integration. Then four types of modality integration approaches are defined: the direct modality integration (Type-I), the integration via DICOM acquisition software (Type-II) the integration via specialised systems either with (Type-III) or without PACS connection (Type-IV). The last section is dedicated to the presentation of the PACS requirements of selected interdisciplinary modality types [Endoscopy, Ultrasound and Electrocardiography (ECG)] and clinical disciplines (Pathology, Dermatology, Ophthalmology and Cardiology), which are then compared with the technical possibilities of a MD-PACS. (orig.)

  17. TRACKING AND MONITORING OF TAGGED OBJECTS EMPLOYING PARTICLE SWARM OPTIMIZATION ALGORITHM IN A DEPARTMENTAL STORE

    Directory of Open Access Journals (Sweden)

    Indrajit Bhattacharya

    2011-05-01

    Full Text Available The present paper proposes a departmental store automation system based on Radio Frequency Identification (RFID technology and Particle Swarm Optimization (PSO algorithm. The items in the departmental store spanned over different sections and in multiple floors, are tagged with passive RFID tags. The floor is divided into number of zones depending on different types of items that are placed in their respective racks. Each of the zones is placed with one RFID reader, which constantly monitors the items in their zone and periodically sends that information to the application. The problem of systematic periodic monitoring of the store is addressed in this application so that the locations, distributions and demands of every item in the store can be invigilated with intelligence. The proposed application is successfully demonstrated on a simulated case study.

  18. Planning and roadmapping technological innovations cases and tools

    CERN Document Server

    Pizarro, Melinda; Talla, Rajasree

    2014-01-01

    Across industries, firms vary broadly on how they operate with respect to their Research & Development (R&D) activities.  This volume presents a holistic approach to evaluating the critical elements of R&D management, including planning, organization, portfolio management, project management, and knowledge transfer—by assessing R&D management from different sectors.  Featuring empirical research and in-depth case studies from industries as diverse as medical imaging, electric vehicles, and cyber security, the authors identify common features of successful R&D management, despite fundamental differences, such as company size, number of employees, industry sector, and the R&D budget.  In particular, they consider the implications for decision making with respect to resource allocation and investments, such as site selection, purchasing, and cross-departmental communication.

  19. The Relationship between Academic Performance and Elementary Student and Teacher Attitudes towards Departmentalizing

    Science.gov (United States)

    Freiberg, Elizabeth J.

    2014-01-01

    In response to the continued pressure placed on American public schools to increase academic achievement, some schools have begun to reorganize instructional environments in an effort to improve student outcomes. The current study examined one such elementary school that implemented a departmentalized model of instruction in fourth and fifth-grade…

  20. Development Plans and Life Plans: Knowledge Sharing?

    Directory of Open Access Journals (Sweden)

    Juan José Vieco Albarracín

    2010-02-01

    Full Text Available This article explores the possibilities of establishing knowledge sharing between governmental development plans and the “life plans” (planes de vida made by indigenous organizations, in particular the life plan of the Asociación de Autoridades Indígenas del Resguardo Tikuna, Cocama, Yagua (Aticoya, municipality of Puerto Nariño, Amazonas, Colombia. Colombia’s Constitution of 1991 created the ETI (Entidad Territorial Indígena,“indigenous territorial entity” as a territorial unit, just like municipalities, departments, and districts. This means that indigenous reservations (or “reserves” or “preserves” and associations should manage public funds, for which they must design a life plan. This inclusion and recognition of indigenous peoples entails that those life plans should articulate with the municipal, departmental, and national development plans. The article illustrates this situation by comparing two welfare programs –Resa (Red de Seguridad Alimentaria “Food Security Network” and Familias Guardabosques (“Forest Ranger Families”– and two income-generating productive and service (tourism projects carried out by Aticoya and the local indigenous councils of communities on the Amazon and Loretoyacu Rivers.

  1. Sociological Stratification: Change and Continuity in the Distribution of Departmental Prestige, 1965-2007

    Science.gov (United States)

    Weakliem, David L.; Gauchat, Gordon; Wright, Bradley R. E.

    2012-01-01

    Previous research has found that there is a good deal of stability in departmental prestige, but has not considered its long-term dynamics. This paper investigates a hypothesis implied by some accounts in the sociology of science and organizational theory: that there will be a permanent component of prestige associated with the department or…

  2. Departmentalized, Self-Contained, or Somewhere in Between: Understanding Elementary Grade-Level Organizational Decision-Making

    Science.gov (United States)

    Parker, Audra; Rakes, Lori; Arndt, Katie

    2017-01-01

    Recent trends indicate a move away from self-contained classrooms and toward content-focused departmentalization in elementary schools. This study takes a snapshot of the existing organizational structures used in elementary schools in one district and explores administrators' beliefs and practices regarding this phenomenon. Our findings suggest…

  3. Balancing High Quality Subject-Matter Instruction with Positive Teacher-Student Relations in the Middle Grades: Effects of Departmentalization, Tracking and Block Scheduling on Learning Environments. Report No. 15.

    Science.gov (United States)

    McPartland, James M.

    This study tests the general hypothesis that there is no single best way to organize a middle school to meet the variety of needs of early adolescent students. Using data from a sample of 433 schools in the Pennsylvania Educational Quality Assessment, it examines the effects of self-contained classroom instruction and departmentalization on two…

  4. Departmentalization and Organizational Context: The Experience of the University of Guadalajara

    OpenAIRE

    Adrián Acosta Silva

    2005-01-01

    This work consists of an evaluation of the experience of organizational reform and academic departmentalization at a Mexican public university, the University of Guadalajara (U. of G.), occurred in the period of 1994-2005. It is a research carried out from the perspective of the institutional change analysis, which obeys the interest of carrying out a rigorous evaluation of the process, after 11 years of its institutional operation. From a reconstruction of the context that gave origin and se...

  5. Corporate plan 1995/1996 to 1999/2000

    International Nuclear Information System (INIS)

    1995-03-01

    The National Radiological Protection Board is a public authority established by the Radiological Protection Act 1970. As with all non-departmental public bodies, it is required to prepare a Corporate Plan; it has done so annually since 1986. In this issue, summary sections on background, objectives, and finances are followed by nine sections describing the major areas of work in a structured manner with objectives, achievements, and directions set out. (UK)

  6. Addressing curricular innovation in a multi-stakeholder environment: Planning to change

    OpenAIRE

    Enslen, Todd

    2001-01-01

    As language innovations move outside the boundaries of autonomous departmental units, the process of change through the planning, design and implementation phases become more complex. Therefore, there is a greater need for awareness of the steps in the innovation process. This is especially true for the planning process since the adoption decision is divided amongst potentially numerous potential adopters. This paper will present a case study of curricular innovation, a move from an EAP to an...

  7. The Woman Engineering Academic: An Investigation of Departmental and Institutional Environments. ASHE Annual Meeting Paper.

    Science.gov (United States)

    Benson, Sherron D.

    This study used grounded theory methodology to investigate the institutional and departmental climates of women engineering faculty. Seven female engineering faculty from two universities completed semi-structured interviews that were coded for common themes. All the participants indicated that they had had a natural interest or talent for science…

  8. Using the departmental Radiology information system to replace specialist registrars logbooks

    International Nuclear Information System (INIS)

    Rauf, Omair; Whitehouse, Richard W.

    2000-01-01

    AIM: To produce and assess a robust and user friendly specialist registrar logbook using a Radiology departmental management system. MATERIALS AND METHODS: Our Radiology management system was modified to include logbook specific data fields. This allowed up to three registrars to be directly involved in any procedure, and two more to be observers to the reporting with only one screen entry, made on the terminals available throughout the department. Logbooks were produced by a PC based analysis program which also compared registrars' experience with updated averages. A comparison of computer generated logbooks with paper logbooks and a user satisfaction survey was undertaken after 1 year of running the system. RESULTS: Computer generated logbooks showed consistent numbers of complex procedures in comparison with other logbook types, with more comprehensive details of each procedure. A survey of the registrars showed an overwhelming preference for the computer generated logbook. CONCLUSION: Modification of a Radiology management system is a robust method of logbook provision, preferred by the registrars over paper or other electronic logbooks and providing the RCR tutor with consistent data on registrar training experience. Rauf, O., Whitehouse, R.W. (2000)

  9. Gas distribution management; elaboration of Gas Supply Triennial Plan. Circular of 21 April 1999; Organisation de la distribution du gaz; elaboration du Plan triennal de desserte gaziere. Circulaire du 21 avril 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-02-07

    The circular of 21 April 1999 issued by the Secretary of State for Industry of the French government concerns the gas distribution and the manner of elaboration of the Plan of gas supply. The recipients are asked, by observing the legislative and regulatory provisions, to contribute by working out the departmental components of the national gas distribution plan. They should establish the list of localities where works for gas distribution should start within three years from the data of plan launching. The circular mentions: I. the context and the concept of the Gas Supply Plan; II. the transitory period; III. criteria of setting in the plan; IV. request for setting, treatment of the request and publication of the plan. The juridical context is established as well as the application field of the circular. Concerning the criteria of setting in the plan one appeals to minimal requirements of economic efficiency and profitableness. Steps from submitting the demand through transmission of the departmental plan proposal to minister in charge with energy are explained. Appendix I establishes the criteria of payback and the evaluation method, Appendix II and Appendix III give models for calculation form and tables for incomes and expenses, respectively. The circular contains also attached two documents, one titled 'The large gas infrastructures' and the other 'Structure of gas sector in France'. The development of European grid, as prelude to a more open market and the development strategies for European operators are presented, as well as the present situation and evolution of the gas sector in France.

  10. Management self assessment plan

    Energy Technology Data Exchange (ETDEWEB)

    Debban, B.L.

    1998-01-30

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.

  11. Management self assessment plan

    International Nuclear Information System (INIS)

    Debban, B.L.

    1998-01-01

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations

  12. Life Cycle Assessment in Spatial Planning

    DEFF Research Database (Denmark)

    Bidstrup, Morten; Pizzol, Massimo; Schmidt, Jannick Højrup

    2015-01-01

    Spatial planning establishes conditions for societal patterns of production and consumption. However, the assigned Strategic Environmental Assessments (SEA) tend to have a too narrow focus. In particular, there is a need for applying a system perspective in SEA, extending assessment beyond...... towards operationalising LCA in SEA by adjusting LCA methodology to focus on the ways planners and planning processes can influence the environmental impacts of interconnected activities. The proposed procedure was tested on a case study of Danish extraction planning, and it was found to generate new...... knowledge for decision support. The procedure enabled identification of key systemic impacts, as well as it enabled formulation of recommendations for how to address these impacts in planning processes. On a more general level, this article demonstrates an application of LCA which until now has received...

  13. New Production Reactor project-management plan

    International Nuclear Information System (INIS)

    McCrosson, F.J.; Hibbard, L.; Buckner, M.R.

    1982-01-01

    This document provides a project management plan for the first phase of a project to design and build a new production reactor (NPR) at SRP. The design of the NPR is based upon proven SRP heavy water reactor design, with several enhancements such as full containment, moderator detritiation, improved cooling, and modernized control rooms and instrumentation. The first phase of the NPR project includes environmental and safety analyses, preparation of the technical data summary and basic data, site studies, engineering studies, and conceptual design. The project management plan was developed by a 14-member task force comprised of representatives from the Technical Division, the Manufacturing Division, the Departmental Engineer's Office, and the Engineering Department

  14. Best Practices in Physics Program Assessment: Should APS Provide Accreditation Standards for Physics?

    Science.gov (United States)

    Hodapp, Theodore

    The Phys21 report, ``Preparing Physics Students for 21st Century Careers,'' provides guidance for physics programs to improve their degree programs to make them more relevant for student career choices. Undertaking such changes and assessing impact varies widely by institution, with many departments inventing assessments with each periodic departmental or programmatic review. American Physical Society has embarked on a process to integrate information from Phys21, the results of other national studies, and educational research outcomes to generate a best-practices guide to help physics departments conduct program review, assessment, and improvement. It is anticipated that departments will be able to use this document to help with their role in university-level accreditation, and in making the case for improvements to departmental programs. Accreditation of physics programs could stem from such a document, and I will discuss some of the thinking of the APS Committee on Education in creating this guide, and how they are advising APS to move forward in the higher education landscape that is increasingly subject to standards-based evaluations. I will describe plans for the design, review, and dissemination of this guide, and how faculty can provide input into its development. This material is based upon work supported by the National Science Foundation under Grant No. 1540570. Opinions expressed do not necessarily reflect those of the NSF.

  15. Performance Assessment Strategy Plan for the Geologic Repository Program

    International Nuclear Information System (INIS)

    1990-01-01

    Performance assessment is a major constituent of the program being conducted by the US Department of Energy (DOE) to develop a geologic repository. Performance assessment is the set of activities needed for quantitative evaluations to assess compliance with the performance requirements in the regulations for a geologic repository and to support the development of the repository. The strategy for these evaluations has been documented in the Performance Assessment Strategy Plan (DOE, 1989). The implementation of the performance assessment strategy is defined in this document. This paper discusses the scope and objectives of the implementation plan, the relationship of the plan to other program plans, summarizes the performance assessment areas and the integrated strategy of the performance assessment program. 1 fig., 3 tabs

  16. Financial Management: U.S. Army Corps of Engineers Financial Information Imported Into the Defense Departmental Reporting System - Audited Financial Statements

    National Research Council Canada - National Science Library

    Granetto, Paul J; Peek, Marvin L; Armstrong, Jack L; Wenzel, Paul C; Furey, Kathleen A; Zimmerman, Craig W

    2004-01-01

    ... are: the Corps of Engineers Financial Management System, the Corps of Engineers Enterprise Management Information System, and the Defense Departmental Reporting System - Audited Financial Statements...

  17. Resource assessment/commercialization planning meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-01-24

    The U.S. Department of Energy, Division of Geothermal Energy and Division of Geothermal Resource Management, sponsored a Resource Assessment/Commercialization Planning meeting in Salt Lake City on January 21-24, 1980. The meeting included presentations by state planning and resource teams from all DOE regions. An estimated 130 people representing federal, state and local agencies, industry and private developers attended.

  18. Comparing comprehensive care and departmental clinical education models: students' perceptions at the University of Tennessee College of Dentistry.

    Science.gov (United States)

    Dehghan, Mojdeh; Harrison, Janet; Langham, Sue; Scarbecz, Mark; Amini, Mehdi

    2015-02-01

    In summer 2012, the University of Tennessee Health Science Center College of Dentistry transitioned from a departmental clinical education model to a comprehensive care/group leader model. The aim of this study was to investigate the perspectives of the fourth-year class of dental students who, because the transition took place during their training, had experienced treating patients under both educational models. To achieve this objective, a questionnaire was designed to assess the students' opinions on the efficiency of their effort, availability of specialty faculty, stress, collaboration with classmates, and availability of exposure to different practice styles and techniques under the two systems. The students were also given an opportunity to provide open-ended feedback on the shortcomings and advantages of the systems. The Class of 2013 had 81 students, 55 of whom participated in the survey for a response rate of 67.9%. The majority (86%) of the respondents preferred the comprehensive care model and reported feeling that, in it, they were able to accomplish more comprehensive dentistry with greater consistency of supervision from faculty in a more patient-centered environment than in the departmental model. However, 56 percent considered having the same group leader for two years a disadvantage and recommended rotation of at least one group leader every six months. The results of this survey can help this college and other dental schools that are seeking to optimize their educational model to best serve students' educational experience and the dental needs of their patient population.

  19. Information resources management long-range plan, FY1994--1998

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This document describes IRM activities and the information technology resources and capabilities of the Department, the future requirements, and the strategies and plans to satisfy the identified requirements. The long-range planning process provides the systematic means to meet this objective and assists the Department in assuring that information technology (IT) support is provided in an efficient, effective, and timely manner so that its programmatic missions can be accomplished. Another important objective of the Plan is to promote better understanding, both within and external to the Department, of its IT environment, requirements, issues, and recommended solutions. This DOE IRM Plan takes into consideration the IRM requirements of approximately 50 different sites. The annual long-range planning cycle for supporting this Plan was initiated by a Call in August 1991 for site plans to be submitted in February 1992 by those Departmental components and contractors with major IRM requirements.

  20. Information resources management long-range plan, FY1994--1998

    International Nuclear Information System (INIS)

    1993-04-01

    This document describes IRM activities and the information technology resources and capabilities of the Department, the future requirements, and the strategies and plans to satisfy the identified requirements. The long-range planning process provides the systematic means to meet this objective and assists the Department in assuring that information technology (IT) support is provided in an efficient, effective, and timely manner so that its programmatic missions can be accomplished. Another important objective of the Plan is to promote better understanding, both within and external to the Department, of its IT environment, requirements, issues, and recommended solutions. This DOE IRM Plan takes into consideration the IRM requirements of approximately 50 different sites. The annual long-range planning cycle for supporting this Plan was initiated by a Call in August 1991 for site plans to be submitted in February 1992 by those Departmental components and contractors with major IRM requirements

  1. 42 CFR 460.132 - Quality assessment and performance improvement plan.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Quality assessment and performance improvement plan... assessment and performance improvement plan. (a) Basic rule. A PACE organization must have a written quality assessment and performance improvement plan. (b) Annual review. The PACE governing body must review the plan...

  2. The effects of departmentalized and self-contained classrooms on fifth-grade students' achievement in science on the Georgia Criterion Referenced Competency Test

    Science.gov (United States)

    Koch, Lisa S.

    Elementary instruction of fifth grade classrooms was found to be primarily in two organizational models in a school district northwest of Atlanta, Georgia. The self-contained classroom provided a generalist teacher responsible for the instruction of all academic subjects to one group of students throughout the day, while departmentalized classrooms were structured utilizing one teacher for the instruction of one or two content areas, and students rotated throughout the day for each of the academic subjects. The majority of studies looking at the effect of instructional organization were concentrated in the content areas of mathematics and reading. This quantitative study, utilized an ex post facto methodology to determine whether fifth grade students attending departmentalized schools or self-contained classrooms had higher student achievement in science as measured by the Georgia Criterion Referenced Competency Test (CRCT). The statistical data was collected through the Georgia Department of Education and included raw mean scores of over 500 students attending departmentalized schools and 500 students attending self-contained classrooms, along with the various subgroups such as gender, ethnicity status, English language learners (ELL), and students with disability (SWD) placement. This data was analyzed to show if a significant statistical difference emerged from either instructional organization. The overall results that emerged from the archival data suggested no significant difference in student achievement existed for almost all subgroups tested of the total 1000+ participant scores used in the study. The results also did however, showed the departmentalization model of instruction had a slight advantage over self-contained classrooms for male students with disabilities.

  3. Laying a Foundation for Comparing Departmental Structures between Reference and Instructional Services: Analysis of a Nationwide Survey.

    Science.gov (United States)

    Johnson, Kristin; Fountain, Kathleen Carlisle

    2002-01-01

    Describes a survey of midsized academic libraries that measured the departmental relationship between librarians who provide reference services and librarians who provide instructional services. Discusses satisfaction levels with various organizational arrangements as well as pros and cons of integrated or separate reference and instruction…

  4. IRIS Assessment Plan for Uranium (Scoping and Problem Formulation Materials)

    Science.gov (United States)

    In January 2018, EPA released the IRIS Assessment Plan for Uranium (Oral Reference Dose) (Scoping and Problem Formulation Materials). An IRIS Assessment Plan (IAP) communicates to the public the plan for assessing each individual chemical and includes summary informatio...

  5. Using the Program Sustainability Assessment Tool to Assess and Plan for Sustainability

    Science.gov (United States)

    Mainor, Avia; Moreland-Russell, Sarah; Maier, Ryan C.; Brossart, Laura; Luke, Douglas A.

    2014-01-01

    Implementing and growing a public health program that benefits society takes considerable time and effort. To ensure that positive outcomes are maintained over time, program managers and stakeholders should plan and implement activities to build sustainability capacity within their programs. We describe a 3-part sustainability planning process that programs can follow to build their sustainability capacity. First, program staff and stakeholders take the Program Sustainability Assessment Tool to measure their program’s sustainability across 8 domains. Next, managers and stakeholders use results from the assessment to inform and prioritize sustainability action planning. Lastly, staff members implement the plan and keep track of progress toward their sustainability goals. Through this process, staff can more holistically address the internal and external challenges and pressures associated with sustaining a program. We include a case example of a chronic disease program that completed the Program Sustainability Assessment Tool and engaged in program sustainability planning. PMID:24456644

  6. 78 FR 55257 - Request for Comments on the Draft Departmental Strategic Plan for FY 2014-2018

    Science.gov (United States)

    2013-09-10

    ... strategic planning consultation process is an opportunity for the Department to refine and strengthen the... and Human Services, Office of the Assistant Secretary for Planning and Evaluation, Strategic Planning... planning process under the Government Performance and Results Modernization Act of 2010 (GPRA-MA) (Pub. L...

  7. Self-Contained versus Departmentalized Settings in Urban Elementary Schools: An Analysis of Fifth-Grade Student Mathematics Performance

    Science.gov (United States)

    Jack, Diamond Marie

    2014-01-01

    Student achievement in mathematics, particularly in urban areas, is a consistent concern in the United States. Research suggests that teachers either are under qualified or have a negative perception of themselves as mathematics teachers. Departmentalization on the elementary level is an organizational structure that may benefit urban students and…

  8. Performance, labour flexibility and migrant workers in hotels: An establishment and departmental level analysis

    OpenAIRE

    Yaduma, N; Williams, A; Lockwood, A; Park, S

    2015-01-01

    © 2015. This paper analyses flexible working, and the employment of migrants, as determinants of performance in hotels, utilising a highly disaggregated data set of actual hours worked and outputs, on a monthly basis, over an 8 year period for 25 establishments within a single firm. It examines not only inter-establishment, but also intra-establishment (departmental) variations in performance. The analysis also systematically compares the findings based on financial versus physical measures, ...

  9. Assessment that Matters: Integrating the "Chore" of Department-Based Assessment with Real Improvements in Political Science Education

    Science.gov (United States)

    Deardorff, Michelle D.; Folger, Paul J.

    2005-01-01

    Assessment requirements often raise great concerns among departments and faculty: fear of loss of autonomy, distraction from primary departmental goals, and the creation of alien and artificial external standards. This article demonstrates how one political science department directly responded to their own unique circumstances in assessing their…

  10. Radioecology-related health physics and radiological protection. Departmental research programme of the BMU. Colloquium proceedings

    International Nuclear Information System (INIS)

    Wirth, E.; Pohl, H.

    1999-08-01

    The conference report covers the full texts of the 18 papers presented at the conference, as well as the contributions to the discussions. Except for two of the 18 papers, which set out the objectives and subjects of the departmental research programmes of the BMU, subject analysis and indexing has been done for individual retrieval of the papers from the database. (orig./CB) [de

  11. Initiating a Programmatic Assessment Report

    Science.gov (United States)

    Berkaliev, Zaur; Devi, Shavila; Fasshauer, Gregory E.; Hickernell, Fred J.; Kartal, Ozgul; Li, Xiaofan; McCray, Patrick; Whitney, Stephanie; Zawojewski, Judith S.

    2014-01-01

    In the context of a department of applied mathematics, a program assessment was conducted to assess the departmental goal of enabling undergraduate students to recognize, appreciate, and apply the power of computational tools in solving mathematical problems that cannot be solved by hand, or would require extensive and tedious hand computation. A…

  12. Planning Support Systems (PSS-Based Spatial Plan Alternatives and Environmental Assessment

    Directory of Open Access Journals (Sweden)

    Hee-Sun Choi

    2016-03-01

    Full Text Available Spatial planning is at the core of national land and urban development. Many countries and cities seek sustainable development through various means such as coordinated environmental planning, environmental assessment, and internalization of environmental analysis and planning. A Planning Support System (PSS is a GIS (Geographic Information System-based, spatial decision-making support system that incorporates a variety of theories and pertinent models. This study adopted the “What if?” model to design an alternative spatial plan that includes generation of predictive scenarios and is relatively easy to use. In the cities studied, we identified a total of six scenarios based on the main drivers of development—namely, population and spatial policies. Subsequently, we assessed the alternatives for their environmental impact, preparing sensitivity maps for each major environmental issue in the target area (natural ecosystem, air and microclimate, natural disasters. One projected advantage of the “What if?” model is that its digital visualization of proposed plans may improve public awareness and involvement. Furthermore, the tool is expected to be highly useful in ensuring the objectivity of quantitative analyses. However, it is necessary to develop a PSS that is both standardized and tailored to the particular needs of each area. Finally, the development of an e-governance system will be beneficial in ensuring public access to the decision making process.

  13. Planning Environmental Impact Assessment Orienting Sustainable Development:Opportunities and Challenges

    Institute of Scientific and Technical Information of China (English)

    Sun Yanjun; Chen Xingeng; Bao Yun; Peng Xiaochun; Gao Changbo

    2005-01-01

    Strategic Environmental Assessment is a frontier subject in the field of Environmental Impact Assessment. In the past two decades, especially in recent years, much more importance has been attached to Strategic Environmental Assessment. The Environmental Impact Assessment Law of the P.R.China which was promulgated provides a great opportunity for the development of Planning Environmental Impact Assessment and brings great challenges for the development of traditional Project Environmental Impact Assessment and Planning Environmental Impact Assessment at the same time.In order to promote the implementation of"The EIA Law", the inherent limitations of Project Environmental Impact Assessment must be identified sufficiendy and the theory research and practice of Planning Environmental Impact Assessment should be strengthened as well. Measures should be taken currendy to enforce the operation system. The authors wish to offer a few references to the progress and implementation of Planning Environmental Impact Assessment in China.

  14. 1996: BMBF expenditures for energy resrearch. Draft of the departmental federal budget 30

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Departmental budget 30 of the 1996 draft federal budget covers the activities of the German Federal Ministry for Education, Science, Research, and Technology (BMBF). The Ministry is the result of an amalgamation, in 1994, of the former Ministry for Education and Science (BMBW) and the former Ministry for Research and Technology (BMFT). For this reason, the total budget as indicated in the figures for 1995 and 1996 cannot be compared directly. The 1996 departmental budget No. 30 comprises a total of DM 15.62 (1995: 15.53) billion. Nuclear technology and nuclear research have desappeared almost completely as budgetary items and can be found only under the headings of Safety Research (DM 81/78 million) and Decommissioning (DM 259/232 million). A similar development was observed in recent years also with the change in names of German national research centers. However, this does not mean that the BMBF has completely withdrawn from nuclear research. These activities are now covered under more general items, such as 'Renewable Energies, Economical Use of Energy, Conversion and Combustion Technologies', for which expenditures of DM 290 (285) million have been earmarked in 1996. The BMBF makes available approx. DM 303 (290) million for investments into research centers, and approx. DM 1.32 (1.31) billion DM to cover their operating costs. The nuclear research share in these funds decreases steadily. DM 467 (472) million have been earmarked for basic research. (orig.) [de

  15. International oil and gas strategies: corporate planning in the new world order

    International Nuclear Information System (INIS)

    Burns, T.G.

    1996-01-01

    The corporate planning process at Chevron Overseas Petroleum Inc. was totally revamped 5 years ago. The company's international exploration and production activities have forced them to recognize that business objectives and strategic plans must be aligned. The planning process described here involves staff groups from the departmental level up to the top of the organization, each providing input to goals and objectives. New venture planning, project approval, the role of technology transfer, and most importantly, the changing role of managing people resources, were discussed. With regard to 'people management' the need for team players, a variety of technical, linguistic, entrepreneurial, and technology transfer skills, adaptability, cultural awareness, and mobility, have been identified as the key ingredients for all successful players in the international arena

  16. Doctoral Advisor-Advisee Pairing in STEM Fields: Selection Criteria and Impact of Faculty, Student and Departmental Factors

    Directory of Open Access Journals (Sweden)

    Simy Joy

    2015-09-01

    Full Text Available Unlike the doctoral programs in places where students are paired with advisors at the time of admission itself, most US programs require the students to choose their advisors, and the advisors to formally accept the students as advisees. Little research has been done to understand how students and faculty approach this mutual selection and pairing process. This paper examines this process in STEM departments (Science, Technology, Engineering and Mathematics, with specific focus on factors influencing the decisions. Based on focus groups and interviews of doctoral students and faculty from STEM departments in an American university, we identify criteria applied by students and faculty in making their choices. Students were found to assess faculty on available funding, area of research, personality, ability to graduate students fast, and career prospects for students, and faculty to assess students on their qualifications/credentials and perceived ability to contribute to research. We also found that this mutual assessment was not objective, but influenced by perceptions associated with faculty gender and career stage, and student nationality. In the end, whether students and faculty were actually paired with persons of their choice depended on departmental factors including prevalent pairing practices, restrictions on student numbers per faculty, and reward structure. We discuss implications of the findings for research and practice.

  17. 24 CFR 401.421 - Rental Assistance Assessment Plan.

    Science.gov (United States)

    2010-04-01

    ... PROGRAM (MARK-TO-MARKET) Restructuring Plan § 401.421 Rental Assistance Assessment Plan. (a) Plan required..., comparable, and affordable housing in the local market; (2) The types of tenants residing in the project (such as elderly families, disabled families, large families, and cooperative homeowners); (3) The local...

  18. Canadian Nuclear Safety Commission 2003-2004 estimates. Part III - report on plans and priorities

    International Nuclear Information System (INIS)

    2003-01-01

    The Commission replace the Atomic Energy Control Board in 2000 as Canada's independent agency which regulates the use of nuclear energy and materials to protect health, safety, security, and the environment. This report is an individual expenditure plan that provides details on a business line basis and contains information on objectives, initiatives, and planned results, including links to related resource requirements over a three-year period. It also provides details on human resource requirements, major capital projects, grants and contributions, and net program costs. Introductory sections with a minister's message are followed by sections giving a departmental or organization overview; plans, results, activities, resources, and initiatives, as applicable; and financial information

  19. Subjective risk assessment for planning conservation projects

    International Nuclear Information System (INIS)

    Game, Edward T; Fitzsimons, James A; Lipsett-Moore, Geoff; McDonald-Madden, Eve

    2013-01-01

    Conservation projects occur under many types of uncertainty. Where this uncertainty can affect achievement of a project’s objectives, there is risk. Understanding risks to project success should influence a range of strategic and tactical decisions in conservation, and yet, formal risk assessment rarely features in the guidance or practice of conservation planning. We describe how subjective risk analysis tools can be framed to facilitate the rapid identification and assessment of risks to conservation projects, and how this information should influence conservation planning. Our approach is illustrated with an assessment of risks to conservation success as part of a conservation plan for the work of The Nature Conservancy in northern Australia. Risks can be both internal and external to a project, and occur across environmental, social, economic and political systems. Based on the relative importance of a risk and the level of certainty in its assessment we propose a series of appropriate, project level responses including research, monitoring, and active amelioration. Explicit identification, prioritization, and where possible, management of risks are important elements of using conservation resources in an informed and accountable manner. (letter)

  20. Planning for exercises of the Federal Radiological Monitoring and Assessment Plan

    International Nuclear Information System (INIS)

    Adler, M.V.

    1985-11-01

    This report is to be used in planning radiological emergency exercises to test the Federal Radiological Monitoring and Assessment Plan (FRMAP). Although developed for this specific purpose, the document also contains material that may be useful for planning other types of exercises. This report describes the types of exercises that might be used, the steps in planning and conducting the exercises, and the special considerations required for exercises to test the FRMAP. FRMAP exercises typically involve several federal and state agencies. General and specific objectives that could guide these exercises, as well as the possible activities of all the participants - players, controllers, and evaluators - are discussed. The resources that each participating federal agency might provide during an exercise are listed

  1. The Molecular Biology Capstone Assessment: A Concept Assessment for Upper-Division Molecular Biology Students

    Science.gov (United States)

    Couch, Brian A.; Wood, William B.; Knight, Jennifer K.

    2015-01-01

    Measuring students' conceptual understandings has become increasingly important to biology faculty members involved in evaluating and improving departmental programs. We developed the Molecular Biology Capstone Assessment (MBCA) to gauge comprehension of fundamental concepts in molecular and cell biology and the ability to apply these concepts in…

  2. [A study on the departmental distribution of mortality by cause: some evidence concerning two populations].

    Science.gov (United States)

    Damiani, P; Masse, H; Aubenque, M

    1984-01-01

    The distributions of proportions of deaths by cause are analyzed for each department of France by sex for the age group 45 to 64. The data are official French departmental data on causes of death for the period 1968-1970. The authors conclude that these distributions are the sum of two log-normal distributions. They also identify the existence of two populations according to whether the cause of death was endogenous or exogenous. (summary in ENG)

  3. Prostate intensity-modulated radiotherapy planning in seven mouse clicks: Development of a class solution for cancer.

    Science.gov (United States)

    Wood, Maree; Fonseca, Amara; Sampson, David; Kovendy, Andrew; Westhuyzen, Justin; Shakespeare, Thomas; Turnbull, Kirsty

    2016-01-01

    The aim of the retrospective study was to develop a planning class solution for prostate intensity-modulated radiotherapy (IMRT) that achieved target and organs-at-risk (OAR) doses within acceptable departmental protocol criteria using the Monaco treatment planning system (Elekta-CMS Software, MO, USA). Advances in radiation therapy technology have led to a re-evaluation of work practices. Class solutions have the potential to produce highly conformal plans in a time-efficient manner. Using data from intermediate and high risk prostate cancer patients, a stepwise quality improvement model was employed. Stage 1 involved the development of a broadly based treatment template developed across 10 patients. Stage 2 involved template refinement and clinical audit ( n  = 20); Stage 3, template review ( n  = 50) and Stage 4 an assessment of a revised template against the actual treatment plan involving 72 patients. The computer algorithm that comprised the Stage 4 template met clinical treatment criteria for 82% of patients. Minor template changes were required for a further 13% of patients. Major changes were required in 4%; one patient could not be assessed. The average calculation time was 13 min and involved seven mouse clicks by the planner. Thus, the new template met treatment criteria or required only minor changes in 95% of prostate patients; this is an encouraging result suggesting improvements in planning efficiency and consistency. It is feasible to develop a class solution for prostate IMRT using a stepwise quality improvement model which delivers clinically acceptable plans in the great majority of prostate cases.

  4. Planning for land use and conservation: Assessing GIS-based conservation software for land use planning

    Science.gov (United States)

    Rob Baldwin; Ryan Scherzinger; Don Lipscomb; Miranda Mockrin; Susan Stein

    2014-01-01

    Recent advances in planning and ecological software make it possible to conduct highly technical analyses to prioritize conservation investments and inform local land use planning. We review these tools, termed conservation planning tools, and assess the knowledge of a key set of potential users: the land use planning community. We grouped several conservation software...

  5. R7 VU Born-Assessed Demo Plan

    Energy Technology Data Exchange (ETDEWEB)

    Robert Nourgaliev

    2010-02-01

    This is an initial draft of a born-assessed VU plan for the RELAP7 (R7) code development effort. The plan will continue to evolve based on the growth of code capability. This growth will be reflected as additional testing is identified and done. Later versions of this document will reflect that growth.

  6. Cumulative effects in strategic environmental assessment: The influence of plan boundaries

    Energy Technology Data Exchange (ETDEWEB)

    Bidstrup, Morten, E-mail: bidstrup@plan.aau.dk [Aalborg University (Denmark); Kørnøv, Lone, E-mail: lonek@plan.aau.dk [Aalborg University (Denmark); Partidário, Maria Rosário, E-mail: mariapartidario@tecnico.ulisboa.pt [CEG-IST, Instituto Superior Técnico, Universidade de Lisboa (Portugal)

    2016-02-15

    Cumulative effects (CE) assessment is lacking quality in impact assessment (IA) worldwide. It has been argued that the strategic environmental assessment (SEA) provides a suitable IA framework for addressing CE because it is applied to developments with broad boundaries, but few have tested this claim. Through a case study on the Danish mining sector, this article explores how plan boundaries influence the analytical boundaries applied for assessing CE in SEA. The case was studied through document analysis in combination with semi-structured group interviews of the responsible planners, who also serve as SEA practitioners. It was found that CE are to some extent assessed and managed implicitly throughout the planning process. However, this is through a focus on lowering the cumulative stress of mining rather than the cumulative stress on and capacity of the receiving environment. Plan boundaries do influence CE assessment, though all boundaries are not equally influential. The geographical and time boundaries of the Danish mining plans are broad or flexible enough to accommodate a meaningful assessment of CE, but the topical boundary is restrictive. The study indicates that collaboration among planning authorities and legally appointed CE leadership may facilitate better practice on CE assessment in sector-specific SEA contexts. However, most pressing is the need for relating assessment to the receiving environment as opposed to solely the stress of a proposed plan.

  7. Cumulative effects in strategic environmental assessment: The influence of plan boundaries

    International Nuclear Information System (INIS)

    Bidstrup, Morten; Kørnøv, Lone; Partidário, Maria Rosário

    2016-01-01

    Cumulative effects (CE) assessment is lacking quality in impact assessment (IA) worldwide. It has been argued that the strategic environmental assessment (SEA) provides a suitable IA framework for addressing CE because it is applied to developments with broad boundaries, but few have tested this claim. Through a case study on the Danish mining sector, this article explores how plan boundaries influence the analytical boundaries applied for assessing CE in SEA. The case was studied through document analysis in combination with semi-structured group interviews of the responsible planners, who also serve as SEA practitioners. It was found that CE are to some extent assessed and managed implicitly throughout the planning process. However, this is through a focus on lowering the cumulative stress of mining rather than the cumulative stress on and capacity of the receiving environment. Plan boundaries do influence CE assessment, though all boundaries are not equally influential. The geographical and time boundaries of the Danish mining plans are broad or flexible enough to accommodate a meaningful assessment of CE, but the topical boundary is restrictive. The study indicates that collaboration among planning authorities and legally appointed CE leadership may facilitate better practice on CE assessment in sector-specific SEA contexts. However, most pressing is the need for relating assessment to the receiving environment as opposed to solely the stress of a proposed plan.

  8. Environmental impact assessment based on planning support system

    NARCIS (Netherlands)

    Carsjens, G.J.; Chen, W.

    2011-01-01

    How to assess environmental impact is one of the keys in land use planning. This article described in detail the concepts of activities, impact zones, functions, and sensitivities, as well as the development of STEPP (strategic tool for integrating environmental aspects in planning procedures) based

  9. Double-shell tank waste transfer facilities integrity assessment plan

    International Nuclear Information System (INIS)

    Hundal, T.S.

    1998-01-01

    This document presents the integrity assessment plan for the existing double-shell tank waste transfer facilities system in the 200 East and 200 West Areas of Hanford Site. This plan identifies and proposes the integrity assessment elements and techniques to be performed for each facility. The integrity assessments of existing tank systems that stores or treats dangerous waste is required to be performed to be in compliance with the Washington State Department of Ecology Dangerous Waste Regulations, Washington Administrative Code WAC-173-303-640 requirements

  10. Developing and assessing accident management plans for nuclear power plants

    International Nuclear Information System (INIS)

    Hanson, D.J.; Johnson, S.P.; Blackman, H.S.; Stewart, M.A.

    1992-07-01

    This document is the second of a two-volume NUREG/CR that discusses development of accident management plans for nuclear power plants. The first volume (a) describes a four-phase approach for developing criteria that could be used for assessing the adequacy of accident management plans, (b) identifies the general attributes of accident management plans (Phase 1), (c) presents a prototype process for developing and implementing severe accident management plans (Phase 2), and (d) presents criteria that can be used to assess the adequacy of accident management plans. This volume (a) describes results from an evaluation of the capabilities of the prototype process to produce an accident management plan (Phase 3) and (b), based on these results and preliminary criteria included in NUREG/CR-5543, presents modifications to the criteria where appropriate

  11. Assessment of the 2004 Danish National Action Plan for Emplyment

    DEFF Research Database (Denmark)

    Emerek, Ruth

    The report gives the economic, employment and policy context for the National Action Plan for employment, and assess the NAP from a gender persepctive......The report gives the economic, employment and policy context for the National Action Plan for employment, and assess the NAP from a gender persepctive...

  12. Integrating Planning, Assessment, and Improvement in Higher Education

    Science.gov (United States)

    Sherlock, Barbara J.

    2009-01-01

    Based on Penn State's popular "Innovation Insights" series, this book brings together in one handy reference nearly a decade of tried and true insights into continuous quality improvements in higher education. Their five-step model for integrating planning, assessment, and improvement moves plans off the shelf and into the weekly and daily…

  13. Coaxing and Persuading: Making Rigorous History Teaching a Departmental Reality

    Science.gov (United States)

    Arscott, Rachel; Hinks, Tom

    2016-01-01

    Faced with the introduction of a two-year key stage and a new whole-school assessment policy, Rachel Arscott and Tom Hinks decided to make a virtue out of necessity and reconsider their whole approach to planning, teaching and assessment at Key Stage 3. In this article they give an account of the process of reflection and revision they undertook…

  14. Administrative Strategies of Departmental Heads as Determinants for the Effective Management of Human Resources in Tertiary Institutions in Delta State, Nigeria

    Science.gov (United States)

    Osakwe, Regina N.

    2015-01-01

    This study investigated administrative strategies of departmental heads as determinants of effective management of human resources in tertiary institutions. Four research questions were asked and four hypotheses were formulated to guide the study. As a descriptive survey, the population comprised all the eight tertiary institutions in the state…

  15. Integrating impact assessment and conflict management in urban planning: Experiences from Finland

    International Nuclear Information System (INIS)

    Peltonen, Lasse; Sairinen, Rauno

    2010-01-01

    The article examines the interlinkages between recent developments in conflict management and impact assessment procedures in the context of urban planning in Finland. It sets out by introducing the fields of impact assessment and conflict mediation. It then proceeds to discuss the development of impact assessment practices and the status of conflict mediation in Finnish land use planning. The case of Korteniitty infill development plan in Jyvaeskylae is used to demonstrate how the Finnish planning system operates in conflict situations - and how social impact assessment can contribute to managing planning conflicts. The authors ask how the processes of impact assessment contribute to conflict management. Based on the Finnish experience, it is argued that social impact assessment of land use plans can contribute to conflict management, especially in the absence of institutionalised conflict mediation processes. In addition, SIA may acquire features of conflict mediation, depending on extent and intensity of stakeholder participation in the process, and the quality of linkages it between knowledge production and decision-making. Simultaneously, conflict mediation practices and theoretical insights can inform the application of SIA to help it address land use conflicts more consciously.

  16. Assessment of LANL waste minimization plan

    International Nuclear Information System (INIS)

    Davis, K.D.; McNair, D.A.; Jennrich, E.A.; Lund, D.M.

    1991-04-01

    The objective of this report is to evaluate the Los Alamos National Laboratory (LANL) Waste Minimization Plan to determine if it meets applicable internal (DOE) and regulatory requirements. The intent of the effort is to assess the higher level elements of the documentation to determine if they have been addressed rather than the detailed mechanics of the program's implementation. The requirement for a Waste Minimization Plan is based in several DOE Orders as well as environmental laws and regulations. Table 2-1 provides a list of the major documents or regulations that require waste minimization efforts. The table also summarizes the applicable requirements

  17. 77 FR 70138 - Submission for OMB Review; Comment Request

    Science.gov (United States)

    2012-11-23

    ... DEPARTMENT OF COMMERCE Submission for OMB Review; Comment Request The Department of Commerce will... NMFS' Operating Plans. This information is vital in assessing the economic, social, and environmental..., Departmental Paperwork Clearance Officer, (202) 482-0336, Department of Commerce, Room 6616, 14th and...

  18. Corporate plan 1997/98 to 2001/02

    International Nuclear Information System (INIS)

    1997-01-01

    The National Radiological Protection Board is a public authority established by the Radiological Protection Act 1970 with functions concerning the protection of people from radiation hazards. Members of the Board are appointed by the Health Ministers. Officers and employees of the Board are responsible to it for executing the functions. The Board produces a Corporate Plan which is presented to the Department of Health, its sponsoring Department. This is the Corporate Plan for 1997/98 and the subsequent four years to 2001/02. It follows from discussions with Government Departments and other customers and reflects Ministerial priorities. It also takes into account the recommendations of the recent Cabinet Office publication on Objective Setting and Monitoring in Executive Non-Departmental Public Bodies prepared by the Efficiency Unit. And it reflects the outcome of the recent Prior Options Review of the Board. The main purposes of the Corporate Plan are to describe the broad programme of work for the planning period and the manner in which it is to be implemented, to identify the strategic and specific objectives, and to make the necessary financial forecasts. (author)

  19. Performance assessment plans and methods for the Salt Repository Project

    International Nuclear Information System (INIS)

    1984-08-01

    This document presents the preliminary plans and anticipated methods of the Salt Repository Project (SRP) for assessing the postclosure and radiological aspects of preclosure performance of a nuclear waste repository in salt. This plan is intended to be revised on an annual basis. The emphasis in this preliminary effort is on the method of conceptually dividing the system into three subsystems (the very near field, the near field, and the far field) and applying models to analyze the behavior of each subsystem and its individual components. The next revision will contain more detailed plans being developed as part of Site Characterization Plan (SCP) activities. After a brief system description, this plan presents the performance targets which have been established for nuclear waste repositories by regulatory agencies (Chapter 3). The SRP approach to modeling, including sensitivity and uncertainty techniques is then presented (Chapter 4). This is followed by a discussion of scenario analysis (Chapter 5), a presentation of preliminary data needs as anticipated by the SRP (Chapter 6), and a presentation of the SRP approach to postclosure assessment of the very near field, the near field, and the far field (Chapters 7, 8, and 9, respectively). Preclosure radiological assessment is discussed in Chapter 10. Chapter 11 presents the SRP approach to code verification and validation. Finally, the Appendix lists all computer codes anticipated for use in performance assessments. The list of codes will be updated as plans are revised

  20. Transition projects FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP) WBS 1.3.1 and 7.1. Volume 2

    International Nuclear Information System (INIS)

    Cartmell, D.B.

    1994-09-01

    This document contains information concerning the management of the Hanford Reservation. Information concerning the departmental schedules is presented in chart form. The following departmental schedules are included: The B-plant/Cesium Capsule Recovery, 300 Area Fuel Supply Program, Plutonium Finishing Plant, and Program and Environmental Management

  1. Water resources management plan

    Directory of Open Access Journals (Sweden)

    Glauco Maia

    2011-12-01

    Full Text Available Water resources manageWith the mission of providing reliable data for water supply activities in medium and large firefighting operations, the Firefighting Water Supply Tactical Group (GTSAI represents an important sector of the Rio de Janeiro State Fire Departmentment plan strategic support. Acting proactively, the Tactical Group prepared a Water Resources Management Plan, aiming to set up water resources for each jurisdiction of firefighters in the City of Rio de Janeiro, in order to assist the Fire Department in its missions. This goal was reached, and in association with LAGEOP (Geoprocessing Laboratory, UFRJ, the Tactical Group started using GIS techniques. The plan provides for the register of existing operational structures within each group (troops, vehicles and special equipment, along with knowledge about the nature and operating conditions of fire hydrants, as well as a detailed survey of areas considered to be "critical". The survey helps to support actions related to environmental disasters involved in the aforementioned critical areas (hospital, churches, schools, and chemical industries, among others. The Caju neighborhood, in Rio de Janeiro, was defined as initial application area, and was the first jurisdiction to have the system implemented, followed by Copacabana, Leblon, Lagoa, and Catete districts.

  2. Assessment Planning within the Context of University English Language Teaching (ELT) in China: Implications for Teacher Assessment Literacy

    Science.gov (United States)

    Xu, Yueting

    2016-01-01

    Teacher assessment literacy (AL) is a concern for both educational assessment and teacher education research. As part of teacher AL, teacher competency of assessment planning has remained underexplored. To address this gap, this study explored how a group of 20 contest-winning university English teachers in China planned for assessment through…

  3. The Association of Departmental Quality Infrastructure and Positive Change

    Directory of Open Access Journals (Sweden)

    Jody E. Hooper MD

    2018-01-01

    Full Text Available A vertically and horizontally well-integrated quality improvement team is essential for effective quality data collection and implementation of improvement measures. We outline the quality structure of a large academic pathology department and describe successful projects across multiple divisions made possible by this tightly integrated structure. The physician vice chair for quality organizes departmental quality efforts and provides representation at the hospital level. The department has an independent continuous quality improvement unit and each laboratory of the department has a staff quality improvement representative. Faculty and staff experts have interacted to produce improvements such as accurate container labeling, efficient triage of specimens, and reduction of unnecessary testing. Specialized task forces such as the Courier Task Force are producing concrete recommendations for process improvement. All phases of pathology patient care are represented by faculty and staff who are trained in quality improvement, and each position touches and communicates actively with levels above and below itself. The key to the department’s approach has been the daily attention to quality efforts in all of its activities and the close association of faculty and staff to accomplish the goals of greater efficiency, safety, and cost savings.

  4. Assessment report for Hanford analytical services quality assurance plan

    International Nuclear Information System (INIS)

    Taylor, L.H.

    1994-11-01

    This report documents the assessment results of DOE/RL-94-55, Hanford Analytical Services Quality Assurance Plan. The assessment was conducted using the Requirement and Self-Assessment Database (RSAD), which contains mandatory and nonmandatory DOE Order statements for the relevant DOE orders

  5. Common and Critical Components Among Community Health Assessment and Community Health Improvement Planning Models.

    Science.gov (United States)

    Pennel, Cara L; Burdine, James N; Prochaska, John D; McLeroy, Kenneth R

    Community health assessment and community health improvement planning are continuous, systematic processes for assessing and addressing health needs in a community. Since there are different models to guide assessment and planning, as well as a variety of organizations and agencies that carry out these activities, there may be confusion in choosing among approaches. By examining the various components of the different assessment and planning models, we are able to identify areas for coordination, ways to maximize collaboration, and strategies to further improve community health. We identified 11 common assessment and planning components across 18 models and requirements, with a particular focus on health department, health system, and hospital models and requirements. These common components included preplanning; developing partnerships; developing vision and scope; collecting, analyzing, and interpreting data; identifying community assets; identifying priorities; developing and implementing an intervention plan; developing and implementing an evaluation plan; communicating and receiving feedback on the assessment findings and/or the plan; planning for sustainability; and celebrating success. Within several of these components, we discuss characteristics that are critical to improving community health. Practice implications include better understanding of different models and requirements by health departments, hospitals, and others involved in assessment and planning to improve cross-sector collaboration, collective impact, and community health. In addition, federal and state policy and accreditation requirements may be revised or implemented to better facilitate assessment and planning collaboration between health departments, hospitals, and others for the purpose of improving community health.

  6. Hanford Remedial Action Environmental Impact Statement, Richland, Washington. Implementation Plan

    International Nuclear Information System (INIS)

    1995-06-01

    This implementation plan was prepared in compliance in compliance with 10 CFR 1021. It includes the following sections: introduction; purpose and need for departmental action; scope, content, and alternatives for the HRA EIS; public participation process; schedule for preparation of the HRA EIS; anticipated environmental reviews and consultations; and contractor disclosure statement. The following appendices are also included: notice of intent, federal register notice for extension of public scoping period, proposed annotated outline for the draft HRA EIS, summary of final report for the Hanford Future Site Uses Working Group, and summary of comments and responses from the public scoping process

  7. Field assessment of a model tuberculosis outbreak response plan for low-incidence areas

    Directory of Open Access Journals (Sweden)

    Pascopella Lisa

    2007-10-01

    Full Text Available Abstract Background For a regional project in four low-incidence states, we designed a customizable tuberculosis outbreak response plan. Prior to dissemination of the plan, a tuberculosis outbreak occurred, presenting an opportunity to perform a field assessment of the plan. The purpose of the assessment was to ensure that the plan included essential elements to help public health professionals recognize and respond to outbreaks. Methods We designed a semi-structured questionnaire and interviewed all key stakeholders involved in the response. We used common themes to assess validity of and identify gaps in the plan. A subset of participants provided structured feedback on the plan. Results We interviewed 11 public health and six community stakeholders. The assessment demonstrated that (1 almost all of the main response activities were reflected in the plan; (2 the plan added value by providing a definition of a tuberculosis outbreak and guidelines for communication and evaluation. These were areas that lacked written protocols during the actual outbreak response; and (3 basic education about tuberculosis and the interpretation and use of genotyping data were important needs. Stakeholders also suggested adding to the plan questions for evaluation and a section for specific steps to take when an outbreak is suspected. Conclusion An interactive field assessment of a programmatic tool revealed the value of a systematic outbreak response plan with a standard definition of a tuberculosis outbreak, guidelines for communication and evaluation, and response steps. The assessment highlighted the importance of education and training for tuberculosis in low-incidence areas.

  8. Fiscal Year 2015 Site Sustainability Plan

    Energy Technology Data Exchange (ETDEWEB)

    Witt, Monica Rene [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-03-16

    Los Alamos National Laboratory is taking action to operate as a living laboratory for sustainable solutions in buildings, climate, energy, purchasing, transportation, waste, and water. LANL prepared the fiscal year (FY) 2015 Site Sustainability Plan (SSP) to describe progress towards the goals established in the SSPP. In addition, per the requirements of DOE Order 436.1, Departmental Sustainability, Los Alamos National Laboratory (LANL) uses its International Organization for Standardization (ISO) 14001:2004 certified Environmental Management System (EMS) to establish objectives to improve compliance, reduce environmental impacts, increase operational capacity, and meet long-term sustainability goals. The goals of the 2015 SSP are fully integrated into LANL’s institutional environmental objectives under the EMS and its Long-Term Strategy for Environmental Stewardship & Sustainability (LTSESS).

  9. The association of departmental leadership gender with that of faculty and residents in radiology.

    Science.gov (United States)

    Shah, Anand; Braga, Larissa; Braga-Baiak, Andresa; Jacobs, Danny O; Pietrobon, Ricardo

    2007-08-01

    Although the number of women graduating from medical school continues to increase, their representation in radiology residency programs has not increased over the past 10 years. We examined whether the gender of radiology faculty and residents differed according to the gender of the departmental leadership. We issued an anonymous Web-based survey via e-mail to all 188 radiology residency program directors listed in the Fellowship and Residency Electronic Interactive Database (FREIDA Online). Data regarding the gender of the department chairperson, residency program director, faculty, and residents were collected. The institutional review board granted a waiver for this study, and all subjects provided informed consent. Of the 84 program directors who responded, 9 (10.7%) were chaired by females and 75 (89.3%) by males; residency program director positions were held by 36 (42.9%) females and 48 (57.1%) males. More programs were located in the northeastern United States (n = 31, 36.9%) than in any other region, and more were self-described as academic (n = 36, 42.9%) than any other practice type. Programs that were led by a male chairperson had a similar proportion of female faculty (25.2% versus 27.3%; P = .322) and residents (26.2% versus 27.4%; P = .065) compared with those led by a female. Similarly, radiology departments with a male residency program director had a similar proportion of female residents (24.8% versus 28.7%; P = .055) compared with programs with a female residency program director. The gender composition of radiology faculty and residents does not differ significantly according to the gender of the departmental chairperson or residency program director. Nevertheless, there continues to be a disparity in the representation of women among radiology faculty and residents.

  10. Clinical Significance: a Therapeutic Approach Topsychological Assessment in Treatment Planning

    Directory of Open Access Journals (Sweden)

    Afolabi Olusegun Emmanuel

    2015-06-01

    Full Text Available Psychological assessment has long been reported as a key component of clinical psychology. This paper examines the complexities surrounding the clinical significance of therapeutic approach to treatment planning. To achieve this objective, the paper searched and used the PsycINFO and PubMed databases and the reference sections of chapters and journal articles to analysed, 1 a strong basis for the usage of therapeutic approach to psychological assessment in treatment plans, 2 explained the conceptual meaning of clinical significant change in therapeutic assessment, 3 answered some of the questions regarding practicability and the clinical significance of therapeutic approach to treatment plans, particularly during or before treatment, 4 linked therapeutic assessment to change in clients’ clinical impression, functioning and therapeutic needs 5 analysed the empirically documenting clinically significant change in therapeutic assessment. Finally, the study suggested that though therapeutic assessment is not sufficient for the systematic study of psychotherapy outcome and process, it is still consistent with both the layman and professional expectations regarding treatment outcome and also provides a precise method for classifying clients as ‘changed’ or ‘unchanged’ on the basis of clinical significance criteria.

  11. 78 FR 12676 - Timing Requirements for the Submission of a Site Assessment Plan (SAP) or General Activities Plan...

    Science.gov (United States)

    2013-02-25

    ...: BOEM-2012-0077] RIN 1010-AD77 Timing Requirements for the Submission of a Site Assessment Plan (SAP) or... would amend the timing requirements for submitting a Site Assessment Plan (SAP) or General Activities... and grants will have a preliminary term of 12 months in which a lessee or grantee must submit a SAP or...

  12. 30 CFR 285.605 - What is a Site Assessment Plan (SAP)?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What is a Site Assessment Plan (SAP)? 285.605... Assessment Plan (SAP)? (a) A SAP describes the activities (e.g., installation of meteorological towers... project easement, or to test technology devices. (1) Your SAP must describe how you will conduct your...

  13. Methods for Cf-252 cervix cancer therapy and treatment planning for GYN malignancies in Lexington

    International Nuclear Information System (INIS)

    Coffey, C.W.; Yoneda, J.; Beach, J.L.; Maruyama, Y.

    1986-01-01

    This paper presents the clinical physics methods and treatment planning techniques used in both the external beam and brachytherapy treatment of GYN malignancies in the Radiotherapy Department of the University of Kentucky Medical Center. Specific description of the departmental implant suite and brachytherapy procedures are included. The optimization of brachytherapy applicator placement, source arrangement, and normal and tumor total dose and dose distributions are presented. Quality assurance protocols for teletherapy and brachytherapy and patient and staff safety procedures with Cf-252 are discussed

  14. Health impact assessment in planning: Development of the design for health HIA tools

    International Nuclear Information System (INIS)

    Forsyth, Ann; Slotterback, Carissa Schively; Krizek, Kevin J.

    2010-01-01

    How can planners more systematically incorporate health concerns into practical planning processes? This paper describes a suite of health impact assessment tools (HIAs) developed specifically for planning practice. Taking an evidence-based approach the tools are designed to fit into existing planning activities. The tools include: a short audit tool, the Preliminary Checklist; a structured participatory workshop, the Rapid HIA; an intermediate health impact assessment, the Threshold Analysis; and a set of Plan Review Checklists. This description provides a basis for future work including assessing tool validity, refining specific tools, and creating alternatives.

  15. 3D planning and radiation oncology residents' training

    International Nuclear Information System (INIS)

    Jayaraman, Subramania

    1991-01-01

    Radiation treatments in radiation oncology clinics have been always planned to irradiate three dimensional (3D) volumes. Though the term 3D planning has come in vogue only in recent years, the essence of 3D planning had been always there. This is because the patient is a 3D subject and every treatment option adopted in a radiotherapy clinic has to be based on a 3D judgement of its acceptability. An essential aspect of training of radiation oncology residents is to help them understand the different techniques and methods used to get an acceptable 3D dose delivery. The tools of 3D planning should be introduced to the residents for their educational value. The regular use of these tools may require not only fast computers and work stations, but also a change of routine in the department. This might be difficult since the departmental routine can evolve only gradually. On the other hand, an insight about the advantages of the tools could be gained through a simple personal computer. Some examples of using the 3D planning tools through a personal computer, for educational purposes have been presented here, using clinical contexts routinely encountered. (author). 5 refs., 10 figs

  16. Assessing ecological sustainability in urban planning - EcoBalance model

    Energy Technology Data Exchange (ETDEWEB)

    Wahlgren, I., Email: irmeli.wahlgren@vtt.fi

    2012-06-15

    Urban planning solutions and decisions have large-scale significance for ecological sustainability (eco-efficiency) the consumption of energy and other natural resources, the production of greenhouse gas and other emissions and the costs caused by urban form. Climate change brings new and growing challenges for urban planning. The EcoBalance model was developed to assess the sustainability of urban form and has been applied at various planning levels: regional plans, local master plans and detailed plans. The EcoBalance model estimates the total consumption of energy and other natural resources, the production of emissions and wastes and the costs caused directly and indirectly by urban form on a life cycle basis. The results of the case studies provide information about the ecological impacts of various solutions in urban development. (orig.)

  17. Planners to the rescue: spatial planning facilitating the development of offshore wind energy.

    Science.gov (United States)

    Jay, Stephen

    2010-04-01

    The development of offshore wind energy has started to take place surprisingly quickly, especially in North European waters. This has taken the wind energy industry out of the territory of planning systems that usually govern the siting of wind farms on land, and into the world of departmental, sectoral regulation of marine activities. Although this has favoured the expansion of offshore wind energy in some respects, evidence suggests that the practice and principles of spatial planning can make an important contribution to the proper consideration of proposals for offshore wind arrays. This is especially so when a strategic planning process is put in place for marine areas, in which offshore wind is treated as part of the overall configuration of marine interests, so that adjustments can be made in the interests of wind energy. The current process of marine planning in the Netherlands is described as an illustration of this. (c) 2009 Elsevier Ltd. All rights reserved.

  18. Research Quality Assessment and Planning Journals. The Italian Perspective.

    Directory of Open Access Journals (Sweden)

    Bruno Zanon

    2014-02-01

    Full Text Available Assessment of research products is a crucial issue for universities and research institutions faced with internationalization and competition. Disciplines are reacting differently to this challenge, and planning, in its various forms – from urban design to process­oriented sectors – is under strain because the increasingly common assessment procedures based on the number of articles published in ranked journals and on citation data are not generally accepted. The reputation of journals, the impact of publications, and the profiles of scholars are increasingly defined by means of indexes such as impact factor and citations counts, but these metrics are questioned because they do not take account of all journals and magazines – in particular those published in languages other than English – and they do not consider teaching and other activities typical of academics and which have a real impact on planning practices at the local level. In Italy the discussion is particularly heated because assessment procedures are recent, the disciplinary community is not used to publishing in ranked international journals, and the Italian literature is not attuned to the international quality criteria. The paper reviews the recent debate on planning journals and research assessment. It focuses on the Italian case from the perspective of improving current practices.

  19. General Plan Environmental Assessment, Hurlburt Field, Florida

    Science.gov (United States)

    2005-10-01

    sebiferum) and cogon grass (Imperata Resource/Issue Areas Hurlburt Field General Plan Environmental Assessment 4-9 cylindrica) are most...habitat on the western portion of the installation. The restoration of a native long-leaf pine/wire grass community on Hurlburt is associated with a

  20. Study on environmental impact assessment of uranium mining and milling base planning

    International Nuclear Information System (INIS)

    Liu Xiaochao; Song Liquan

    2008-01-01

    Environmental impact assessment (EIA) of project planning is part of strategic EIA, which provides full consideration and evaluation of the potential environmental impact on tiered basis in the process of plan implementation. With account being taken of EIA of uranium mining/milling base and the current situation of mining/milling industry, this paper determined environmental protection objectives of EIA, screened assessment indexes and identified weighting factors. Based on the characteristics of mines planned, restrictive score values are estimated each for EIA weighting factor. Finally some suggestions were made for adjusting the plan. (authors)

  1. Corporate plan 1990/91 to 1994/95

    International Nuclear Information System (INIS)

    1990-04-01

    The Cabinet Office (Management and Personnel Office), when setting down guidelines, recommended that all Non-Departmental Public Bodies such as the Board should prepare Corporate Plans against which the performance of the organisation and the relevance of the activities to contemporary requirements could be better measured. The National Radiological Protection Board prepares a Corporate Plan annually. This year's plan is for the financial period 1990/91 through to 1994/95, both years inclusive. The document indicates the broad programme areas in which the Board intends to concentrate its efforts, and the trends it expects over the planning period. The Board's overall strategy is to cover a wide range of relevant radiological protection matters, but with most emphasis on those likely to become major points of public or governmental concern in the near future. Current major issues are the new draft recommendations from the International Commission on Radiological Protection for control of exposure, and subsequent national recommendations on dose limitation: public exposures and aspects of radiation in the environment, particularly radon; and increasing awareness of non-ionising radiation. The Board is partly dependent upon receipts from its commercial activities and must, therefore, also look at the provision of services and prepare to meet the demands likely to arise in the 1990s. (author)

  2. Study on environmental impact assessment index system of uranium production base construction plan

    International Nuclear Information System (INIS)

    Liu Xiaochao; Song Liquan

    2008-01-01

    The index system on planning environmental impact assessment of uranium mining base construction is discussed by using the hiberarchy method according to characteristics of uranium production and environmental protection object of planning assessment. The suggested index system is in favor of persistent exploitation of uranium resource and environmental protection in the uranium mining area, and can provide a reference for planning environmental impact assessment of uranium mining base construction in China. (authors)

  3. ASSESSMENT OF KNOWLEDGE AND ATTITUDE OF COMPUTER ASSISTED LEARNING AMONG MEDICAL STUDENTS

    Directory of Open Access Journals (Sweden)

    Ravish

    2015-12-01

    Full Text Available INTRODUCTION: It is going truth globally that the medical course in medical college students are developed via computer mediated learning.1 Utilization of both the range upon online messages options must create study exciting, monetization, and likely as hired. We Hypothesized that survey will facilitate to permit us to be able to blueprint some on this necessary condition among my medical students and also to improve our study facilities a lot of automatically. A set of closed ended problems remained displayed on departmental website, to evaluate their computer skills and talents and their own assessment in computer and internet skills helping in learning. In the beginning months of 1st year MBBS college students 2014-15 batch taken up voluntarily to the study through MCQs questions provided to them in the form of departmental website. A batch of 50 college students surveyed on 3 different days. Although 80% students were confident with the operational skills of the computer, the opinion regarding the usage of computers for web based learning activities was not uniform i.e., 55% of the participants felt uncomfortable with web assisted activity in comparison to paper based activity. However, 49% were of the opinion that paper based activity might become redundant and websites will take over books in the future. Expansion on computer-assisted study requires traditional changes as well as thoughtful strategic planning, resource giving, staff benefits, Edutainment promotion by multidisciplinary working, and efficient quality control.

  4. Linking global scenarios to national assessments: Experiences from the Resources Planning Act (RPA) Assessment

    Science.gov (United States)

    Linda L. Langner; Peter J. Ince

    2012-01-01

    The Resources Planning Act (RPA) Assessment provides a nationally consistent analysis of the status and trends of the Nation's renewable forest resources. A global scenario approach was taken for the 2010 RPA Assessment to provide a shared world view of potential futures. The RPA Assessment scenarios were linked to the global scenarios and climate projections used...

  5. RCRA Assessment Plan for Single-Shell Tank Waste Management Area TX-TY

    Energy Technology Data Exchange (ETDEWEB)

    Horton, Duane G.

    2007-03-26

    WMA TX-TY contains underground, single-shell tanks that were used to store liquid waste that contained chemicals and radionuclides. Most of the liquid has been removed, and the remaining waste is regulated under the RCRA as modi¬fied in 40 CFR Part 265, Subpart F and Washington State’s Hazardous Waste Management Act . WMA TX-TY was placed in assessment monitoring in 1993 because of elevated specific conductance. A groundwater quality assessment plan was written in 1993 describing the monitoring activities to be used in deciding whether WMA TX-TY had affected groundwater. That plan was updated in 2001 for continued RCRA groundwater quality assessment as required by 40 CFR 265.93 (d)(7). This document further updates the assessment plan for WMA TX-TY by including (1) information obtained from ten new wells installed at the WMA after 1999 and (2) information from routine quarterly groundwater monitoring during the last five years. Also, this plan describes activities for continuing the groundwater assessment at WMA TX TY.

  6. Tooth wear risk assessment and care-planning in general dental practice.

    Science.gov (United States)

    O'Toole, S; Khan, M; Patel, A; Patel, N J; Shah, N; Bartlett, D; Movahedi, S

    2018-03-09

    Objective To assess charting, risk assessment and treatment-planning of tooth wear between recently qualified and experienced dentists in general dental practice.Design Service evaluation.Setting Multi-setting evaluation of three mixed NHS/Private general dental practices in North-East London.Methods The clinical notes of new patient examinations on dentate adults presenting from the 1 October 2016 to 31 December 2016 were audited collecting data on tooth wear charting, risk assessment and treatment planning. Data were analysed using descriptives, chi square and logistic regressions in SPSS. Significance was inferred at p charted for 48% of those attending foundation dentists and 5% of those attending experienced dentists. Diet was assessed in 50.6% of patients examined by foundation dentists and 1.0% of patients examined by experienced dentists. Foundation dentists were more likely to chart tooth wear, risk assess and preventively manage tooth wear compared to experienced dentists (p <0.001).Conclusion This service evaluation highlights that improvements are required in recording, risk assessing and preventive treatment planning of erosive tooth wear. Experienced dentists were less likely to risk assess tooth wear and less likely to provide preventive treatment. Experienced GDPs may benefit from re-training in this area.

  7. AVLIS Production Plant Preliminary Quality Assurance Plan and Assessment

    International Nuclear Information System (INIS)

    1984-01-01

    This preliminary Quality Assurance Plan and Assessment establishes the Quality Assurance requirements for the AVLIS Production Plant Project. The Quality Assurance Plan defines the management approach, organization, interfaces, and controls that will be used in order to provide adequate confidence that the AVLIS Production Plant design, procurement, construction, fabrication, installation, start-up, and operation are accomplished within established goals and objectives. The Quality Assurance Program defined in this document includes a system for assessing those elements of the project whose failure would have a significant impact on safety, environment, schedule, cost, or overall plant objectives. As elements of the project are assessed, classifications are provided to establish and assure that special actions are defined which will eliminate or reduce the probability of occurrence or control the consequences of failure. 8 figures, 18 tables

  8. IRIS Assessment Plan for Ammonia and Ammonium Salts Noncancer Oral (Scoping and Problem Formulation Materials)

    Science.gov (United States)

    In April 2018, EPA released the draft IRIS Assessment Plan for Ammonia and Ammonium Salts Noncancer Oral. An IRIS Assessment Plan (IAP) communicates to the public the plan for assessing each individual chemical and includes summary information on the IRIS Program’s sco...

  9. Assessment and treatment of planning skills in adolescents with ADHD

    NARCIS (Netherlands)

    Boyer, B.E.

    2016-01-01

    Planning problems are described to be prominent in the daily lives of adolescents with ADHD (Barkley, 2004) and may cause comorbid conditions and impairments (Safren, 2006). Therefore the central aim of this thesis was to assess planning skills of adolescents with ADHD and to investigate whether

  10. Assessment Of Knowledge And Attitude Towards Family Planning ...

    African Journals Online (AJOL)

    Assessment Of Knowledge And Attitude Towards Family Planning Among Selected ... Among reasons for low uptake is religious belief on procreation. ... leaders as a change agent by the stakeholders to increase the uptake and use of family ...

  11. Improving the effectiveness of planning EIA (PEIA) in China: Integrating planning and assessment during the preparation of Shenzhen's Master Urban Plan

    International Nuclear Information System (INIS)

    Che Xiuzhen; English, Alex; Lu Jia; Chen, Yongqin David

    2011-01-01

    The enactment and implementation of the 2003 EIA Law in China institutionalised the role of plan environmental impact assessment (PEIA). While the philosophy, methodology and mechanisms of PEIA have gradually permeated through the various levels of government with a positive effect on the process and outcome of urban planning, only a few cities in China have so far carried out PEIA as a Strategic Environmental Assessment (SEA)-type procedure. One such case is the southern city of Shenzhen. During the past three decades, Shenzhen has grown from a small town to a large and booming city as China has successfully and rapidly developed its economy by adopting the 'reform and open door' policy. In response to the challenges arising from the generally divergent processes of rapid urbanisation, economic transformation and environment protection, Shenzhen has incrementally adopted the SEA concept in developing the city's Master Urban Plan. As such, this paper reviews the effectiveness of PEIA in three ways: ·as a tool and process for achieving more sustainable and strategic planning; ·to determine the level of integration of SEA within the planning system; and, ·its effectiveness vis-a-vis implementation. The implementation of PEIA within Shenzhen's Master Urban Plan offers important insights into the emergence of innovative practices in undertaking PEIA as well as theoretical contributions to the field, especially in exploring the relationship between PEIA and SEA and highlighting the central role of local governing institutions in SEA development.

  12. A systematic process for developing and assessing accident management plans

    International Nuclear Information System (INIS)

    Hanson, D.J.; Blackman, H.S.; Meyer, O.R.; Ward, L.W.

    1991-04-01

    This document describes a four-phase approach for developing criteria recommended for use in assessing the adequacy of nuclear power plant accident management plans. Two phases of the approach have been completed and provide a prototype process that could be used to develop an accident management plan. Based on this process, a preliminary set of assessment criteria are derived. These preliminary criteria will be refined and improved when the remaining steps of the approach are completed, that is, after the prototype process is validated through application. 9 refs., 10 figs., 7 tabs

  13. Plans for Hand-Held/Portable Oil Assessment Devices

    National Research Council Canada - National Science Library

    Urbansky, Edward

    2005-01-01

    At the request of the U.S. Army Oil Analysis Program, the JOAP TSC conducted a market study, assembled a plan of action, and prepared a worksheet for the evaluation of portable or hand-held oil assessment devices...

  14. Assessing the Financial Condition of Provider-Sponsored Health Plans.

    Science.gov (United States)

    McCue, Michael J

    2015-06-01

    The aim of this study was to assess the performance of health plans sponsored by provider organizations, with respect to plans generating strong positive cash flow relative to plans generating weaker cash flow. A secondary aim was to assess their capital adequacy. The study identified 24 provider-sponsored health plans (PSHPs) with an average positive cash flow margin from 2011 through 2013 at or above the top 75th percentile, defined as "strong cash flow PSHPs:" This group was compared with 72 PSHPs below the 75th percentile, defined as "weak cash flow PSHPs:" Atlantic Information Services Directory of Health Plans was used to identify the PSHPs. Financial ratios were computed from 2013 National Association of Insurance Commissioners Financial Filings. The study conducted a t test mean comparison between strong and weak cash flow PSHPs across an array of financial performance and capital adequacy measures. In 2013, the strong cash flow PSHPs averaged a cash-flow margin ratio of 6.6%. Weak cash flow PSHPs averaged a cash-flow margin of -0.4%. The net worth capital position of both groups was more than 4.5 times authorized capital. The operational analysis shows that strong cash-flow margin PSHPs are managing their medical costs to achieve this position. Although their medical loss ratio increased by almost 300 basis points from 2011 to 2013, it was still statistically significantly lower than the weaker cash flow PSHP group (P<.001). In terms of capital adequacy, both strong and weak cash-flow margin PSHP groups possessed sufficient capital to ensure the viability of these plans.

  15. 76 FR 4719 - Draft Comprehensive Conservation Plan and Environmental Assessment, Selawik National Wildlife...

    Science.gov (United States)

    2011-01-26

    ... guides and transporters to maintain big game hunting opportunities while reducing social conflict in the...] Draft Comprehensive Conservation Plan and Environmental Assessment, Selawik National Wildlife Refuge... period for the Revised Comprehensive Conservation Plan and Environmental Assessment for Selawik National...

  16. Applying programmatic risk assessment to nuclear materials stabilization R and D planning

    International Nuclear Information System (INIS)

    Brown-Van Hoozer, S.A.; Kenley, C.R.

    1997-01-01

    A systems engineering approach to programmatic risk assessment, derived from the aerospace industry, was applied to various stabilization technologies to assess their relative maturity and availability for use in stabilizing nuclear materials. The assessment provided valuable information for trading off available technologies and identified the at-risk technologies that will require close tracking by the Department of Energy (DOE) to mitigate programmatic risks. This paper presents the programmatic risk assessment methodology developed for the 1995 R and D Plan and updated for the 1996 R and D Plan. Results of the 1996 assessment also are presented (DOE/ID-10561, 1996)

  17. Readiness Assessment Plan, Hanford 200 areas treated effluent disposal facilities

    International Nuclear Information System (INIS)

    Ulmer, F.J.

    1995-01-01

    This Readiness Assessment Plan documents Liquid Effluent Facilities review process used to establish the scope of review, documentation requirements, performance assessment, and plant readiness to begin operation of the Treated Effluent Disposal system in accordance with DOE-RLID-5480.31, Startup and Restart of Facilities Operational Readiness Review and Readiness Assessments

  18. Multimodal document management in radiotherapy

    International Nuclear Information System (INIS)

    Fahrner, H.; Kirrmann, S.; Roehner, F.; Schmucker, M.; Hall, M.; Heinemann, F.

    2013-01-01

    Background and purpose: After incorporating treatment planning and the organisational model of treatment planning in the operating schedule system (BAS, 'Betriebsablaufsystem'), complete document qualities were embedded in the digital environment. The aim of this project was to integrate all documents independent of their source (paper-bound or digital) and to make content from the BAS available in a structured manner. As many workflow steps as possible should be automated, e.g. assigning a document to a patient in the BAS. Additionally it must be guaranteed that at all times it could be traced who, when, how and from which source documents were imported into the departmental system. Furthermore work procedures should be changed that the documentation conducted either directly in the departmental system or from external systems can be incorporated digitally and paper document can be completely avoided (e.g. documents such as treatment certificate, treatment plans or documentation). It was a further aim, if possible, to automate the removal of paper documents from the departmental work flow, or even to make such paper documents superfluous. In this way patient letters for follow-up appointments should automatically generated from the BAS. Similarly patient record extracts in the form of PDF files should be enabled, e.g. for controlling purposes. Method: The available document qualities were analysed in detail by a multidisciplinary working group (BAS-AG) and after this examination and assessment of the possibility of modelling in our departmental workflow (BAS) they were transcribed into a flow diagram. The gathered specifications were implemented in a test environment by the clinical and administrative IT group of the department of radiation oncology and subsequent to a detailed analysis introduced into clinical routine. Results: The department has succeeded under the conditions of the aforementioned criteria to embed all relevant documents in the departmental

  19. Sanitary landfill groundwater quality assessment plan Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Wells, D.G.; Cook, J.W.

    1990-06-01

    This assessment monitoring plan has been prepared in accordance with the guidance provided by the SCDHEC in a letter dated December 7, 1989 from Pearson to Wright and a letter dated October 9, 1989 from Keisler to Lindler. The letters are included a Appendix A, for informational purposes. Included in the plan are all of the monitoring data from the landfill monitoring wells for 1989, and a description of the present monitoring well network. The plan proposes thirty-two new wells and an extensive coring project that includes eleven soil borings. Locations of the proposed wells attempt to follow the SCDHEC guidelines and are downgradient, sidegradient and in the heart of suspected contaminant plumes. Also included in the plan is the current Savannah River Site Sampling and Analysis Plan and the well construction records for all of the existing monitoring wells around the sanitary landfill.

  20. Safety assessment plans for authorization and inspection of radiation sources

    International Nuclear Information System (INIS)

    2002-05-01

    The objective of this TECDOC is to enhance the efficacy, quality and efficiency of the whole regulatory process. It provides advice on good practice administrative procedures for the regulatory process for preparation of applications, granting of authorizations, inspection, and enforcement. It also provides information on the development and use of standard safety assessment plans for authorization and inspection. The plans are intended to be used in conjunction with more detailed advice related to specific practices. In this sense, this TECDOC provides advice on a systematic approach to evaluations of protection and safety while other IAEA Safety Guides assist the user to distinguish between the acceptable and the unacceptable. This TECDOC covers administrative advice to facilitate the regulatory process governing authorization and inspection. It also covers the use of standard assessment and inspection plans and provides simplified plans for the more common, well established uses of radiation sources in medicine and industry, i.e. sources for irradiation facilities, industrial radiography, well logging, industrial gauging, unsealed sources in industry, X ray diagnosis, nuclear medicine, teletherapy and brachytherapy

  1. Safety assessment plans for authorization and inspection of radiation sources

    International Nuclear Information System (INIS)

    1999-09-01

    The objective of this TECDOC is to enhance the efficacy, quality and efficiency of the whole regulatory process. It provides advice on good practice administrative procedures for the regulatory process for preparation of applications, granting of authorizations, inspection, and enforcement. It also provides information on the development and use of standard safety assessment plans for authorization and inspection. The plans are intended to be used in conjunction with more detailed advice related to specific practices. In this sense, this TECDOC provides advice on a systematic approach to evaluations of protection and safety while other IAEA Safety Guides assist the user to distinguish between the acceptable and the unacceptable. This TECDOC covers administrative advice to facilitate the regulatory process governing authorization and inspection. It also covers the use of standard assessment and inspection plans and provides simplified plans for the more common, well established uses of radiation sources in medicine and industry, i.e. sources for irradiation facilities, industrial radiography, well logging, industrial gauging, unsealed sources in industry, X ray diagnosis, nuclear medicine, teletherapy and brachytherapy

  2. Building and measuring infrastructure and capacity for community health assessment and health improvement planning in Florida.

    Science.gov (United States)

    Abarca, Christine; Grigg, C Meade; Steele, Jo Ann; Osgood, Laurie; Keating, Heidi

    2009-01-01

    COMPASS (Comprehensive Assessment, Strategic Success) is the Florida Department of Health's community health assessment and health improvement planning initiative. Since 2002, COMPASS built state and county health department infrastructure to support a comprehensive, systematic, and integrated approach to community health assessment and planning. To assess the capacity of Florida's 67 county health departments (CHDs) to conduct community health assessment and planning and to identify training and technical assistance needs, COMPASS surveyed the CHDs using a Web-based instrument annually from 2004 through 2008. Response rate to the survey was 100 percent annually. In 2007, 96 percent of CHDs reported conducting assessment and planning within the past 3 years; 74 percent used the MAPP (Mobilizing for Action through Planning and Partnerships) framework. Progress was greater for the organizational and assessment phases of the MAPP-based work; only 10 CHDs had identified strategic priorities in 2007, and even fewer had implemented strategies for improving health. In 2007, the most frequently requested types of training were measuring success, developing goals and action plans, and using qualitative data; technical assistance was most frequently requested for program evaluation and writing community health status reports. Florida's CHDs have increased their capacity to conduct community health assessment and planning. Questions remain about sustaining these gains with limited resources.

  3. Planned home birth in the United States and professionalism: a critical assessment.

    Science.gov (United States)

    Chervenak, Frank A; McCullough, Laurence B; Grünebaum, Amos; Arabin, Birgit; Levene, Malcolm I; Brent, Robert L

    2013-01-01

    Planned home birth has been considered by some to be consistent with professional responsibility in patient care. This article critically assesses the ethical and scientific justification for this view and shows it to be unjustified. We critically assess recent statements by professional associations of obstetricians, one that sanctions and one that endorses planned home birth. We base our critical appraisal on the professional responsibility model of obstetric ethics, which is based on the ethical concept of medicine from the Scottish and English Enlightenments of the 18th century. Our critical assessment supports the following conclusions. Because of its significantly increased, preventable perinatal risks, planned home birth in the United States is not clinically or ethically benign. Attending planned home birth, no matter one's training or experience, is not acting in a professional capacity, because this role preventably results in clinically unnecessary and therefore clinically unacceptable perinatal risk. It is therefore not consistent with the ethical concept of medicine as a profession for any attendant to planned home birth to represent himself or herself as a "professional." Obstetric healthcare associations should neither sanction nor endorse planned home birth. Instead, these associations should recommend against planned home birth. Obstetric healthcare professionals should respond to expressions of interest in planned home birth by pregnant women by informing them that it incurs significantly increased, preventable perinatal risks, by recommending strongly against planned home birth, and by recommending strongly for planned hospital birth. Obstetric healthcare professionals should routinely provide excellent obstetric care to all women transferred to the hospital from a planned home birth.The professional responsibility model of obstetric ethics requires obstetricians to address and remedy legitimate dissatisfaction with some hospital settings and

  4. Climate change adaptation impact cost assessment in France

    International Nuclear Information System (INIS)

    2009-01-01

    This document reports the works of an inter-departmental group and of sector-based and transverse groups which aimed at assessing the impacts of climate change. After a first contribution about the assessment methodology, the works of sector-based groups and transverse groups are reported. These groups are dealing with agriculture, forest, infrastructures and built environment, tourism, energy, health, water, natural risks (and insurance and adaptation to climatic change in metropolitan France), biodiversity and land. For each of them, challenges, assessment approaches, first results and perspectives are discussed

  5. Implementing Trauma-Informed Partner Violence Assessment in Family Planning Clinics.

    Science.gov (United States)

    Decker, Michele R; Flessa, Sarah; Pillai, Ruchita V; Dick, Rebecca N; Quam, Jamie; Cheng, Diana; McDonald-Mosley, Raegan; Alexander, Kamila A; Holliday, Charvonne N; Miller, Elizabeth

    2017-09-01

    Intimate partner violence (IPV) and reproductive coercion (RC) are associated with poor reproductive health. Little is known about how family planning clinics implement brief IPV/RC assessment interventions in practice. We describe the uptake and impact of a brief, trauma-informed, universal IPV/RC assessment and education intervention. Intervention implementation was evaluated via a mixed methods study among women ages 18 and up receiving care at one of two family planning clinics in greater Baltimore, MD. This mixed methods study entailed a quasi-experimental, single group pretest-posttest study with family planning clinic patients (baseline and exit survey n = 132; 3-month retention n = 68; retention rate = 52%), coupled with qualitative interviews with providers and patients (total n = 35). Two thirds (65%) of women reported receiving at least one element of the intervention on their exit survey immediately following the clinic-visit. Patients reported that clinic-based IPV assessment is helpful, irrespective of IPV history. Relative to those who reported neither, participants who received either intervention element reported greater perceived caring from providers, confidence in provider response to abusive relationships, and knowledge of IPV-related resources at follow-up. Providers and patients alike described the educational card as a valuable tool. Participants described trade-offs of paper versus in-person, electronic medical record-facilitated screening, and patient reluctance to disclose current situations of abuse. In real-world family planning clinic settings, a brief assessment and support intervention was successful in communicating provider caring and increasing knowledge of violence-related resources, endpoints previously deemed valuable by IPV survivors. Results emphasize the merit of universal education in IPV/RC clinical interventions over seeking IPV disclosure.

  6. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  7. Flexibility and a Departmental Instructional Planning Model.

    Science.gov (United States)

    Miner, Norris

    The flexibility of an educational program, institution, or system can be described as the ability of the unit to absorb negative responses, such as reductions in funding or enrollments, and continue to function in a viable manner. One approach to adjustment to such reductions is to effect cuts in personnel, current, and equipment spending. This…

  8. Intelligent Aircraft Damage Assessment, Trajectory Planning, and Decision-Making under Uncertainty

    Science.gov (United States)

    Lopez, Israel; Sarigul-Klijn, Nesrin

    Situational awareness and learning are necessary to identify and select the optimal set of mutually non-exclusive hypothesis in order to maximize mission performance and adapt system behavior accordingly. This paper presents a hierarchical and decentralized approach for integrated damage assessment and trajectory planning in aircraft with uncertain navigational decision-making. Aircraft navigation can be safely accomplished by properly addressing the following: decision-making, obstacle perception, aircraft state estimation, and aircraft control. When in-flight failures or damage occur, rapid and precise decision-making under imprecise information is required in order to regain and maintain control of the aircraft. To achieve planned aircraft trajectory and complete safe landing, the uncertainties in system dynamics of the damaged aircraft need to be learned and incorporated at the level of motion planning. The damaged aircraft is simulated via a simplified kinematic model. The different sources and perspectives of uncertainties in the damage assessment process and post-failure trajectory planning are presented and classified. The decision-making process for an emergency motion planning and landing is developed via the Dempster-Shafer evidence theory. The objective of the trajectory planning is to arrive at a target position while maximizing the safety of the aircraft given uncertain conditions. Simulations are presented for an emergency motion planning and landing that takes into account aircraft dynamics, path complexity, distance to landing site, runway characteristics, and subjective human decision.

  9. Maintenance Plan for the Hanford Immobilized Low-Activity Tank Waste Performance Assessment

    International Nuclear Information System (INIS)

    MANN, F.M.

    2000-01-01

    The plan for maintaining the Hanford Immobilized Low-Activity Tank Waste Performance Assessment (PA) is described. The plan includes expected work on PA reviews and revisions, waste reports, monitoring, other operational activities, etc

  10. Strategic plan for the development of IAEA safeguards equipment

    International Nuclear Information System (INIS)

    Khlebnikov, N.

    2001-01-01

    Full text: The need for a top-down Safeguards Strategy to focus departmental objectives was recognized by the Programme Performance Appraisal System (PPAS) performed on the Equipment Development Project in 1999. The Department of Safeguards prepared at the end of 2000 a 5-year Strategic Plan to identify the changes and improvements expected to take place over the 2001-2005 period. Those Strategic Objectives were supposed to be used to properly plan IAEA Safeguards activities and define appropriate and coherent R and D programmes. The present paper describes the strategic directions that the IAEA will follow in the area of equipment development in order to meet the Safeguards Department long-term objectives for 2001-2005. The paper, which is derived from the IAEA Strategic Equipment Development Plan, prepared by the Division of Technical Support, includes two parts: general principles and policies applicable to all equipment development tasks; specific strategic guidance. The paper will not describe the detailed plans which are prepared based on the strategic plan on a biannual basis. Equipment development activities have been divided in five major projects (NDA, Seals, Surveillance, Unattended Monitoring and Remote Monitoring). Strategic directions for each of these projects will be described in the paper. Separate sections will deal with equipment development strategic guidance in the area of additional protocol inspections, JNFL projects, illicit trafficking and Trilateral Initiative. (author)

  11. Research activities in radiation protection. Programme report 1997. Report on the departmental research programme of the Federal Ministry for Environment, Nature Conservation and Reactor Safety (BMU), performed under the scientific and administrative project management of the Federal Office for Radiation Protection (BfS)

    International Nuclear Information System (INIS)

    Schmitt-Hannig, A.; Goedde, R.; Thieme, M.

    1998-03-01

    On behalf of the Federal Ministry for Environment, Nature Conservation and Nuclear Safety (BMU), the Federal Office for Radiation Protection (BfS) is placing research and study contracts in the field of radiation protection. The results of these projects are used for developing radiation protection rules and to fulfill the special radiation protection tasks of the BMU, required by law. Planning, expert and administrative management, placing, assistance as well as expert evaluation of the results from these research projects lies within the responsibility of the Federal Office for Radiation Protection. This report provides information on preliminary and final results of radiation protection projects within the BMU Departmental Research Programme of the year 1997. (orig.) [de

  12. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents a complete response to the Tiger Team assessment that was conducted to Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 2, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root cause of the findings identified during the assessment. This report is concerned with reactors safety and health findings, responses, and planned actions. Specific areas include: organization and administration; quality verification; operations; maintenance; training and certification; auxiliary systems; emergency preparedness; technical support; nuclear criticality safety; security/safety interface; experimental activities; site/facility safety review; radiological protection; personnel protection; fire protection; management findings, responses, and planned actions; self-assessment findings, responses, and planned actions; and summary of planned actions, schedules, and costs

  13. Quality assessment for VMAT prostate radiotherapy planning based on data envelopment analysis

    International Nuclear Information System (INIS)

    Lin, Kuan-Min; Simpson, John; Raith, Andrea; Ehrgott, Matthias; Sasso, Giuseppe

    2013-01-01

    The majority of commercial radiotherapy treatment planning systems requires planners to iteratively adjust the plan parameters in order to find a satisfactory plan. This iterative trial-and-error nature of radiotherapy treatment planning results in an inefficient planning process and in order to reduce such inefficiency, plans can be accepted without achieving the best attainable quality. We propose a quality assessment method based on data envelopment analysis (DEA) to address this inefficiency. This method compares a plan of interest to a set of past delivered plans and searches for evidence of potential further improvement. With the assistance of DEA, planners will be able to make informed decisions on whether further planning is required and ensure that a plan is only accepted when the plan quality is close to the best attainable one. We apply the DEA method to 37 prostate plans using two assessment parameters: rectal generalized equivalent uniform dose (gEUD) as the input and D95 (the minimum dose that is received by 95% volume of a structure) of the planning target volume (PTV) as the output. The percentage volume of rectum overlapping PTV is used to account for anatomical variations between patients and is included in the model as a non-discretionary output variable. Five plans that are considered of lesser quality by DEA are re-optimized with the goal to further improve rectal sparing. After re-optimization, all five plans improve in rectal gEUD without clinically considerable deterioration of the PTV D95 value. For the five re-optimized plans, the rectal gEUD is reduced by an average of 1.84 Gray (Gy) with only an average reduction of 0.07 Gy in PTV D95. The results demonstrate that DEA can correctly identify plans with potential improvements in terms of the chosen input and outputs. (paper)

  14. Risk assessment for biodiversity conservation planning in Pacific Northwest forests

    Science.gov (United States)

    Becky K. Kerns; Alan Ager

    2007-01-01

    Risk assessment can provide a robust strategy for landscape-scale planning challenges associated with species conservation and habitat protection in Pacific Northwest forests. We provide an overview of quantitative and probabilistic ecological risk assessment with focus on the application of approaches and influences from the actuarial, financial, and technical...

  15. Self-guided training for deep brain stimulation planning using objective assessment.

    Science.gov (United States)

    Holden, Matthew S; Zhao, Yulong; Haegelen, Claire; Essert, Caroline; Fernandez-Vidal, Sara; Bardinet, Eric; Ungi, Tamas; Fichtinger, Gabor; Jannin, Pierre

    2018-04-04

    Deep brain stimulation (DBS) is an increasingly common treatment for neurodegenerative diseases. Neurosurgeons must have thorough procedural, anatomical, and functional knowledge to plan electrode trajectories and thus ensure treatment efficacy and patient safety. Developing this knowledge requires extensive training. We propose a training approach with objective assessment of neurosurgeon proficiency in DBS planning. To assess proficiency, we propose analyzing both the viability of the planned trajectory and the manner in which the operator arrived at the trajectory. To improve understanding, we suggest a self-guided training course for DBS planning using real-time feedback. To validate the proposed measures of proficiency and training course, two experts and six novices followed the training course, and we monitored their proficiency measures throughout. At baseline, experts planned higher quality trajectories and did so more efficiently. As novices progressed through the training course, their proficiency measures increased significantly, trending toward expert measures. We developed and validated measures which reliably discriminate proficiency levels. These measures are integrated into a training course, which quantitatively improves trainee performance. The proposed training course can be used to improve trainees' proficiency, and the quantitative measures allow trainees' progress to be monitored.

  16. Peer Review Plan for OPPT Work Plan Risk Assessment of 1 - Bromopropane (“1 - BP”)

    Science.gov (United States)

    This document outlines the peer review plan for a risk assessment which addresses occupational uses of 1-BP in dry-cleaning and foam gluing operations, consumer uses in aerosol solvent cleaners and spray adhesives, and its effects on human health.

  17. Institutional Effectiveness Plan: Assessing Effectiveness To Improve Service and Increase Accountability.

    Science.gov (United States)

    Quinley, John W.; And Others

    This institutional effectiveness plan for Central Piedmont Community College (CPCC) is designed to serve as the blueprint by which assessment activities are undertaken and results disseminated throughout the college. First, Chapter One provides an overview of CPCC's self-study planning process, indicating that a 33-member task force comprised of…

  18. Between structures and norms : Assessing tax increment financing for the Dutch spatial planning toolkit

    NARCIS (Netherlands)

    Root, Liz; Van Der Krabben, Erwin; Spit, Tejo

    2015-01-01

    The aim of the paper is to assess the institutional (mis)fit of tax increment financing for the Dutch spatial planning financial toolkit. By applying an institutionally oriented assessment framework, we analyse the interconnectivity of Dutch municipal finance and spatial planning structures and

  19. Considerations for using data envelopment analysis for the assessment of radiotherapy treatment plan quality.

    Science.gov (United States)

    Simpson, John; Raith, Andrea; Rouse, Paul; Ehrgott, Matthias

    2017-10-09

    Purpose The operations research method of data envelopment analysis (DEA) shows promise for assessing radiotherapy treatment plan quality. The purpose of this paper is to consider the technical requirements for using DEA for plan assessment. Design/methodology/approach In total, 41 prostate treatment plans were retrospectively analysed using the DEA method. The authors investigate the impact of DEA weight restrictions with reference to the ability to differentiate plan performance at a level of clinical significance. Patient geometry influences plan quality and the authors compare differing approaches for managing patient geometry within the DEA method. Findings The input-oriented DEA method is the method of choice when performing plan analysis using the key undesirable plan metrics as the DEA inputs. When considering multiple inputs, it is necessary to constrain the DEA input weights in order to identify potential plan improvements at a level of clinical significance. All tested approaches for the consideration of patient geometry yielded consistent results. Research limitations/implications This work is based on prostate plans and individual recommendations would therefore need to be validated for other treatment sites. Notwithstanding, the method that requires both optimised DEA weights according to clinical significance and appropriate accounting for patient geometric factors is universally applicable. Practical implications DEA can potentially be used during treatment plan development to guide the planning process or alternatively used retrospectively for treatment plan quality audit. Social implications DEA is independent of the planning system platform and therefore has the potential to be used for multi-institutional quality audit. Originality/value To the authors' knowledge, this is the first published examination of the optimal approach in the use of DEA for radiotherapy treatment plan assessment.

  20. Assessment of quality of care in family planning services in Jimma ...

    African Journals Online (AJOL)

    Background: Providing quality of care in family planning services is an important task for care providers so as to increase service utilization and coverage; however, little is known about the existing quality of care in such services. Objective: To assess quality of care in family planning services in Jimma Zone, southwest ...

  1. Quality Management Plan for the Environmental Assessment and Innovation Division

    Science.gov (United States)

    Quality management plan (QMP) which identifies the mission, roles, responsibilities of personnel with regard to quality assurance and quality management for the environmental assessment and innovation division.

  2. Integration of the radiotherapy irradiation planning in the digital workflow

    International Nuclear Information System (INIS)

    Roehner, F.; Schmucker, M.; Henne, K.; Bruggmoser, G.; Grosu, A.L.; Frommhold, H.; Heinemann, F.E.; Momm, F.

    2013-01-01

    Background and purpose: At the Clinic of Radiotherapy at the University Hospital Freiburg, all relevant workflow is paperless. After implementing the Operating Schedule System (OSS) as a framework, all processes are being implemented into the departmental system MOSAIQ. Designing a digital workflow for radiotherapy irradiation planning is a large challenge, it requires interdisciplinary expertise and therefore the interfaces between the professions also have to be interdisciplinary. For every single step of radiotherapy irradiation planning, distinct responsibilities have to be defined and documented. All aspects of digital storage, backup and long-term availability of data were considered and have already been realized during the OSS project. Method: After an analysis of the complete workflow and the statutory requirements, a detailed project plan was designed. In an interdisciplinary workgroup, problems were discussed and a detailed flowchart was developed. The new functionalities were implemented in a testing environment by the Clinical and Administrative IT Department (CAI). After extensive tests they were integrated into the new modular department system. Results and conclusion: The Clinic of Radiotherapy succeeded in realizing a completely digital workflow for radiotherapy irradiation planning. During the testing phase, our digital workflow was examined and afterwards was approved by the responsible authority. (orig.)

  3. Life cycle assessment as an analytical tool in strategic environmental assessment. Lessons learned from a case study on municipal energy planning in Sweden

    International Nuclear Information System (INIS)

    Björklund, Anna

    2012-01-01

    Life cycle assessment (LCA) is explored as an analytical tool in strategic environmental assessment (SEA), illustrated by case where a previously developed SEA process was applied to municipal energy planning in Sweden. The process integrated decision-making tools for scenario planning, public participation and environmental assessment. This article describes the use of LCA for environmental assessment in this context, with focus on methodology and practical experiences. While LCA provides a systematic framework for the environmental assessment and a wider systems perspective than what is required in SEA, LCA cannot address all aspects of environmental impact required, and therefore needs to be complemented by other tools. The integration of LCA with tools for public participation and scenario planning posed certain methodological challenges, but provided an innovative approach to designing the scope of the environmental assessment and defining and assessing alternatives. - Research highlights: ► LCA was explored as analytical tool in an SEA process of municipal energy planning. ► The process also integrated LCA with scenario planning and public participation. ► Benefits of using LCA were a systematic framework and wider systems perspective. ► Integration of tools required some methodological challenges to be solved. ► This proved an innovative approach to define alternatives and scope of assessment.

  4. Hurricane Sandy science plan: coastal impact assessments

    Science.gov (United States)

    Stronko, Jakob M.

    2013-01-01

    Hurricane Sandy devastated some of the most heavily populated eastern coastal areas of the Nation. With a storm surge peaking at more than 19 feet, the powerful landscape-altering destruction of Hurricane Sandy is a stark reminder of why the Nation must become more resilient to coastal hazards. In response to this natural disaster, the U.S. Geological Survey (USGS) received a total of $41.2 million in supplemental appropriations from the Department of the Interior (DOI) to support response, recovery, and rebuilding efforts. These funds support a science plan that will provide critical scientific information necessary to inform management decisions for recovery of coastal communities, and aid in preparation for future natural hazards. This science plan is designed to coordinate continuing USGS activities with stakeholders and other agencies to improve data collection and analysis that will guide recovery and restoration efforts. The science plan is split into five distinct themes: coastal topography and bathymetry, impacts to coastal beaches and barriers, impacts of storm surge, including disturbed estuarine and bay hydrology, impacts on environmental quality and persisting contaminant exposures, impacts to coastal ecosystems, habitats, and fish and wildlife. This fact sheet focuses assessing impacts to coastal beaches and barriers.

  5. Writing Information Literacy Assessment Plans: A Guide to Best Practice

    Directory of Open Access Journals (Sweden)

    Megan Oakleaf

    2010-03-01

    Full Text Available Academic librarians throughout higher education add value to the teaching and learning missions of their institutions though information literacy instruction. To demonstrate the full impact of librarians on students in higher education, librarians need comprehensive information literacy assessment plans, composed of instructional program-level and outcome-level components, that summarize the purpose of information literacy assessment, emphasize the theoretical basis of their assessment efforts, articulate specific information literacy goals and outcomes, describe the major assessment methods and tools used to capture evidence of student learning, report assessment results, and highlight improvements made as a consequence of learning assessment.

  6. Assessing the health equity impacts of regional land-use plan making: An equity focussed health impact assessment of alternative patterns of development of the Whitsunday Hinterland and Mackay Regional Plan, Australia (Short report)

    International Nuclear Information System (INIS)

    Gunning, Colleen; Harris, Patrick; Mallett, John

    2011-01-01

    Health service and partners completed an equity focussed health impact assessment to influence the consideration of health and equity within regional land-use planning in Queensland, Australia. This project demonstrated how an equity oriented assessment matrix can assist in testing regional planning scenarios. It is hoped that this HIA will contribute to the emerging interest in ensuring that potential differential health impacts continue to be considered as part of land-use planning processes.

  7. Integration of Regional Mitigation Assessment and Conservation Planning

    Directory of Open Access Journals (Sweden)

    James H. Thorne

    2009-06-01

    Full Text Available Government agencies that develop infrastructure such as roads, waterworks, and energy delivery often impact natural ecosystems, but they also have unique opportunities to contribute to the conservation of regional natural resources through compensatory mitigation. Infrastructure development requires a planning, funding, and implementation cycle that can frequently take a decade or longer, but biological mitigation is often planned and implemented late in this process, in a project-by-project piecemeal manner. By adopting early regional mitigation needs assessment and planning for habitat-level impacts from multiple infrastructure projects, agencies could secure time needed to proactively integrate these obligations into regional conservation objectives. Such practice can be financially and ecologically beneficial due to economies of scale, and because earlier mitigation implementation means potentially developable critical parcels may still be available for conservation. Here, we compare the integration of regional conservation designs, termed greenprints, with early multi-project mitigation assessment for two areas in California, USA. The expected spatial extent of habitat impacts and associated mitigation requirements from multiple projects were identified for each area. We used the reserve-selection algorithm MARXAN to identify a regional greenprint for each site and to seek mitigation solutions through parcel acquisition that would contribute to the greenprint, as well as meet agency obligations. The two areas differed in the amount of input data available, the types of conservation objectives identified, and local land-management capacity. They are representative of the range of conditions that conservation practitioners may encounter, so contrasting the two illustrates how regional advanced mitigation can be generalized for use in a wide variety of settings. Environmental organizations can benefit from this approach because it provides a

  8. 77 FR 24979 - Plan of Operations, Environmental Assessment, Big Thicket National Preserve, Texas

    Science.gov (United States)

    2012-04-26

    ... DEPARTMENT OF THE INTERIOR National Park Service [7148-NZY] Plan of Operations, Environmental.... ACTION: Notice of Availability of a Plan of Operations and Environmental Assessment for a 30-day public... Energy Company (Cimarex), a Plan of Operations to conduct the Rivers Edge 3-D Seismic Survey within the...

  9. Implementing Strategic Environmental Assessment of spatial planning tools

    International Nuclear Information System (INIS)

    De Montis, Andrea

    2013-01-01

    After more than a decade from the publication of the European Directive 2001/42/CE (Directive) on Strategic Environmental Assessment (SEA), the design and construction of the interested spatial planning instruments has gone through a variety of changes and integrations in European and in world states. This inhomogeneous panorama can be explained with a pattern of institutional structures that have so far affected the implementation of the Directive. The aim of this paper is to investigate the level of implementation of the Directive in Italy by developing a comparative analysis of the quality of integration of SEA within the design of the spatial coordination plan of a set of Italian provinces. Italian practice is analyzed in the framework of a comparative study of worldwide SEA implementation within spatial and land use planning. The results reveal strengths and weaknesses in SEA implementation at the provincial level and, in particular, the emergence of critical areas of research concerning institutional context, public participation, monitoring, and observatory of the spatial transformations. -- Highlights: • This is a comparative analysis of SEA in strategic spatial planning in Italy. • The adhesion of Provinces to the study is remarkable. • SEA implementation and integration into spatial planning is still moderate. • Participation via consultations should be more widespread. • Monitoring and institution of observatories are still in an infancy stage

  10. Waste convention regulatory impact on planning safety assessment for LILW disposal in Croatia

    International Nuclear Information System (INIS)

    Valcic, I.; Subasic, D.; Lokner, V.

    2000-01-01

    Preparations for establishment of a LILW repository in Croatia have reached a point where a preliminary safety assessment for the prospective facility is being planned. The planning is not based upon the national regulatory framework, which does not require such an assessment at this early stage, but upon the interagency BSS and the IAEA RADWASS programme recommendations because the national regulations are being revised with express purpose to conform to the most recent international standards and good practices. The Waste Convention, which Croatia has ratified in the meantime, supports this approach in principle, but does not appear to have more tangible regulatory relevance for the safety assessment planning. Its actual requirements regarding safety analyses for a repository fall short of the specific assessment concepts practiced in this decade, and could have well been met by the old Croatian regulations from the mid-eighties. (author)

  11. 76 FR 54195 - 2010 Resources Planning Act (RPA) Assessment Draft

    Science.gov (United States)

    2011-08-31

    ... Resources Planning Act (RPA) Assessment is available for review and comment at http://www.fs.fed.us/research... facsimile to 703-605-5131 or by email using the comment form on the Web site http://www.fs.fed.us/research... . Additional information about the RPA Assessment can be obtained on the Internet at http://www.fs.fed.us...

  12. Planning Intervention Using Dynamic Assessments: A Case Study

    Science.gov (United States)

    Hasson, Natalie; Dodd, Barbara

    2014-01-01

    Dynamic assessments (DA) of language have been shown to be a useful addition to the battery of tests used to diagnose language impairments in children, and to evaluate their skills. The current article explores the value of the information gained from a DA in planning intervention for a child with language impairment. A single case study was used…

  13. The Impact of Vocational Assessment Information on the Individualized Education Planning Process. Supporting Curriculum-Based Assessment.

    Science.gov (United States)

    Stodden, Robert A.; And Others

    1989-01-01

    Educational records of 127 secondary students with disabilities were reviewed to assess impact of vocational assessment information in Individualized Education Plan (IEP) development process. Results focus on the impact of information on the number of IEP vocational goals and objectives written, kinds of IEP items written, and number of IEP goals…

  14. Assessment of hazards and risks for landscape protection planning in Sicily.

    Science.gov (United States)

    La Rosa, Daniele; Martinico, Francesco

    2013-09-01

    Landscape protection planning is a complex task that requires an integrated assessment and involves heterogeneous issues. These issues include not only the management of a considerable amount of data to describe landscape features but also the choice of appropriate tools to evaluate the hazards and risks. The landscape assessment phase can provide fundamental information for the definition of a Landscape Protection Plan, in which the selection of norms for protection or rehabilitation is strictly related to hazards, values and risks that are found. This paper describes a landscape assessment methodology conducted by using GIS, concerning landscape hazards, values and risk. Four hazard categories are introduced and assessed concerning urban sprawl and erosion: landscape transformations by new planned developments, intensification of urban sprawl patterns, loss of agriculture land and erosion. Landscape value is evaluated by using different thematic layers overlaid with GIS geoprocessing. The risk of loss of landscape value is evaluated, with reference to the potential occurrence of the previously assessed hazards. The case study is the Province of Enna (Sicily), where landscape protection is a relevant issue because of the importance of cultural and natural heritage. Results show that high value landscape features have a low risk of loss of landscape value. For this reason, landscape protection policies assume a relevant role in landscapes with low-medium values and they should be addressed to control the urban sprawl processes that are beginning in the area. Copyright © 2012 Elsevier Ltd. All rights reserved.

  15. Integrated Assessment Plan Template and Operational Demonstration for SPIDERS Phase 2: Fort Carson

    Energy Technology Data Exchange (ETDEWEB)

    Barr, Jonathan L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tuffner, Francis K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hadley, Mark D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kreyling, Sean J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Schneider, Kevin P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-09-01

    This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collected from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).

  16. The Fermilab ISDN Pilot Project: Experiences and future plans

    Energy Technology Data Exchange (ETDEWEB)

    Martin, D.E.; Lego, A.J.; Clifford, A.E.

    1995-12-31

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen users were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. Each home was equipped with a basic rate ISDN (BRI) line, a BRI Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking.

  17. The Fermilab ISDN Pilot Project: Experiences and future plans

    International Nuclear Information System (INIS)

    Martin, D.E.; Lego, A.J.; Clifford, A.E.

    1995-01-01

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen users were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. Each home was equipped with a basic rate ISDN (BRI) line, a BRI Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking

  18. The Fermilab ISDN pilot project: experiences and future plans

    International Nuclear Information System (INIS)

    Martin, D.E.; Lego, A.J.; Clifford, A.E.

    1996-01-01

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. each home was equipped with a basic rate ISDN (BRI) Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking. (author)

  19. A Treatment Planning Analysis of Inverse-Planned and Forward-Planned Intensity-Modulated Radiation Therapy in Nasopharyngeal Carcinoma

    International Nuclear Information System (INIS)

    Poon, Ian M; Xia Ping; Weinberg, Vivien; Sultanem, Khalil; Akazawa, Clayton C.; Akazawa, Pamela C.; Verhey, Lynn; Quivey, Jeanne Marie; Lee, Nancy

    2007-01-01

    Purpose: To compare dose-volume histograms of target volumes and organs at risk in 57 patients with nasopharyngeal carcinoma (NPC) with inverse- (IP) or forward-planned (FP) intensity-modulated radiation treatment (IMRT). Methods and Materials: The DVHs of 57 patients with NPC with IMRT with or without chemotherapy were reviewed. Thirty-one patients underwent IP IMRT, and 26 patients underwent FP IMRT. Treatment goals were to prescribe a minimum dose of 66-70 Gy for gross tumor volume and 59.4 Gy for planning target volume to greater than 95% of the volume. Multiple selected end points were used to compare dose-volume histograms of the targets, including minimum, mean, and maximum doses; percentage of target volume receiving less than 90% (1-V90%), less than 95% (1-V95%), and greater than 105% (1-V105%). Dose-volume histograms of organs at risk were evaluated with characteristic end points. Results: Both planning methods provided excellent target coverage with no statistically significant differences found, although a trend was suggested in favor of improved target coverage with IP IMRT in patients with T3/T4 NPC (p = 0.10). Overall, IP IMRT statistically decreased the dose to the parotid gland, temporomandibular joint, brain stem, and spinal cord overall, whereas IP led to a dose decrease to the middle/inner ear in only the T1/T2 subgroup. Conclusions: Use of IP and FP IMRT can lead to good target coverage while maintaining critical structures within tolerance. The IP IMRT selectively spared these critical organs to a greater degree and should be considered the standard of treatment in patients with NPC, particularly those with T3/T4. The FP IMRT is an effective second option in centers with limited IP IMRT capacity. As a modification of conformal techniques, the human/departmental resources to incorporate FP-IMRT should be nominal

  20. Vulnerability Assessments and Resilience Planning at Federal Sites

    Energy Technology Data Exchange (ETDEWEB)

    Moss, Richard H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Blohm, Andrew [Univ. of Maryland, College Park, MD (United States); Delgado, Alison [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Henriques, Justin J. [James Madison Univ., Harrisonburg, VA (United States); Malone, Elizabeth L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-02-01

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Departments of Energy and Defense. The paper provides a framework of steps for climate vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change.

  1. IRIS Assessment Plan for Ammonia and Ammonium Salts Noncancer Oral (Scoping and Problem Formulation Materials)

    Science.gov (United States)

    In April 2018, EPA released the draft IRIS Assessment Plan for Ammonia and Ammonium Salts Noncancer Oral. The IAP communicates to the public the plan for assessing each individual chemical and includes summary information on the IRIS Program’s scoping and initial proble...

  2. Decommissioning planning and the assessment of alternatives for the Hanford production reactors

    International Nuclear Information System (INIS)

    Miller, C.E. Jr.; Potter, R.F.

    1985-01-01

    Several years ago, the US Department of Energy began assessing alternatives and planning the decommissioning of eight shut-down plutonium production reactors located on the DOE Hanford Site in Washington State. The first of these graphite-moderated, water-cooled, reactors was built and started up in 1944 as part of the World War II Manhattan Project. The last of them started up in 1955. The eight reactors each operated for 12 to 24 years, with all eight operating simultaneously for about 10 years. In the 1960's, production needs declined and the reactors were one-by-one permanently shut down, the last of them in 1971. (A ninth Hanford production reactor, N Reactor, was started up in 1963; it is still operating and is not within the scope of the decommissioning planning and alternatives assessment work reported in this paper). This paper provides an overview description of the decommissioning plan for the eight shut-down Hanford production reactors and their associated fuel storage basins. Included are descriptions of the decommissioning alternatives considered for the facilities, along with discussions of National Environmental Policy Act (NEPA) process activities applicable to the Hanford decommissioning work. The criteria used in assessing decommissioning alternatives and the assumptions used in the decommissioning planning are identified. 4 refs., 8 figs., 3 tabs

  3. Beyond Student Learning Outcomes: Developing Comprehensive, Strategic Assessment Plans for Advising Programmes

    Science.gov (United States)

    McClellan, Jeffrey L.

    2011-01-01

    This article argues that while the importance of assessment in academic advising is clear and the current emphasis on defining and measuring student learning outcomes represents an essential component of any comprehensive advising assessment plan, an even more comprehensive understanding of programme assessment is needed. Drawing upon business…

  4. An Extended Validity Argument for Assessing Feedback Culture.

    Science.gov (United States)

    Rougas, Steven; Clyne, Brian; Cianciolo, Anna T; Chan, Teresa M; Sherbino, Jonathan; Yarris, Lalena M

    2015-01-01

    score of each item on the FFCT (range = 0-100) was analyzed. Convergent and divergent properties of the four archetypes were assessed using a multitrait-multimethod matrix of Pearson's coefficients. Expecting that items in one archetype would diverge from the others, whereas items within an archetype should have strong convergent properties, convergent validity was assessed by comparing items across domains that all related to the same archetype. Similarly, divergent validity was assessed by comparing the correlation of items within an archetype to the correlations of those items within a hetero-domain block (i.e., to other items within the same domain). Three of the four domains of the FFCT (Overall Departmental Characteristics 35.4 ± 15.4, Departmental Foundation of Feedback 46.1 ± 16.7, and Departmental Emphasis of Feedback 30.3 ± 17.7) had the highest mean in the Market archetype (results/achievement oriented), whereas the final domain (Departmental Definition of Successful Feedback 34.8 ± 22.1) had the highest mean in the Clan archetype (personal growth/team achievement). Item responses in the Clan and Hierarchy archetypes had the strongest convergent and divergent validity, respectively. Item responses in the Adhocracy archetype had the weakest convergent and divergent validity. Although the sample size was small, this initial study demonstrates that a modified organizational culture assessment tool can feasibly be utilized to identify the primary formative feedback archetype of a cohort of residents. This may have future implications for measuring changes in culture after the implementation of strategic programs to address formative feedback. Future studies should examine the generalizability of the FFCT to other institutions, as well as address the weak validity evidence of the Adhocracy archetype in the FFCT.

  5. 1997 U.S. Department of Energy Strategic Plan

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1997-09-01

    With the end of the Cold War and the election of President Clinton, the Department of Energy (DOE) set a new course which began with the publication of its first departmental strategic plan in April 1994. Entitled ``Fueling a Competitive Economy, it provided the framework and shared vision for meeting responsibilities in energy, national security, environmental quality, and science and technology. The strategic plan was the guidepost for the formulation of the Department`s FY 1996, FY 1997, and FY 1998 budgets and was critical to the development of the Department`s Strategic Alignment Initiative, designed to save $1.7 billion over five years. This current plan, which has been significantly improved through a very close consultation process with Congress and customers stakeholders, takes DOE to the next important performance level by being more directly linked to actions and results. It defines a strategic goal for each of the Department`s four business lines and, in the spirit of the Government Performance and Results Act and the National Performance Review, identifies a fifth goal addressing corporate management. Reengineering the business practices, managing for results, being open with neighbors and stakeholders, and ensuring the safety and health of DOE workers and the public are, and will continue to be, among the highest of priorities. Over the coming years, DOE plans to achieve their strategic goals through specific identifiable strategies. Each business line has clear objectives and straightforward ways of defining whether DOE has succeeded in meeting those objectives.

  6. Transportation infrastructure upgrades in the South: A compilation of state plans for construction near nuclear reactor sites

    International Nuclear Information System (INIS)

    1992-03-01

    There are currently 27 nuclear reactor sites located in the southern region. In many instances, the most practicable modes of transportation of spent nuclear fuel from these sites we through the use of highway and rail systems. These two transportation modes have important differences that affect their applicability; chief among these, perhaps, is the fact that while highway systems are publicly owned and maintained rail lines are owned by private entities. For this reason, track condition and maintenance, usage rates and other aspects of rail transport can vary widely. This report reviews southern state, department plans for infrastructure upgrades in the vicinity of nuclear reactor sites. This report includes a summary of planned modifications to bridges, access highways, and rail spurs (where applicable) over the next five years. The information contained herein was gathered from interviews with officials within state departments of transportation. With few exceptions, the contact person was an official within the departmental planning division

  7. Review of quality assessment tools for family planning programmes in low- and middle-income countries.

    Science.gov (United States)

    Sprockett, Andrea

    2017-03-01

    Measuring and tracking the quality of healthcare is a critical part of improving service delivery, clinic efficiency and health outcomes. However, no standardized or widely accepted tool exists to assess the quality of clinic-based family planning services in low- and middle-income countries. The objective of this literature review was to identify widely used public domain quality assessment tools with existing or potential application in clinic-based family planning programmes. Using PubMed, PopLine, Google Scholar and Google, key terms such as ‘quality assessment tool’, ‘quality assessment method’, ‘quality measurement’, ‘LMIC’, ‘developing country’, ‘family planning’ and ‘reproductive health’ were searched for articles, identifying 20 relevant tools. Tools were assessed to determine the type of quality components assessed, divided into structure and process components, level of application (national or facility), health service domain that can be assessed by the tool, cost and current use of the tool. Tools were also assessed for shortcomings based on application in a low- and middle-income clinic-based family planning programme, including personnel required, re-assessment frequency, assessment of structure, process and outcome quality, comparability of data over time and across facilities and ability to benchmark clinic results to a national benchmark. No tools met all criteria, indicating a critical gap in quality assessment for low- and middle-income family planning programmes. To achieve Universal Health Coverage, agreed on in the Sustainable Development Goals and to improve system-wide healthcare quality, we must develop and widely adopt a standardized quality assessment tool.

  8. Integrating strategic environmental assessment with industry planning: a case study of the Pasquai-Porcupine forest management plan, Saskatchewan, Canada.

    Science.gov (United States)

    Noble, Bram F

    2004-03-01

    Strategic environmental assessment (SEA) is gaining widespread recognition as a tool for integrating environmental considerations in policy, plan, and program development and decision-making. Notwithstanding the potential of SEA to improve higher-order decision processes, there has been very little attention given to integrating SEA with industry planning practices. As a result, the benefits of SEA have yet to be fully realized among industrial proponents. That said, SEA practice is ongoing, albeit informally and often under a different label, and is proving to be a valuable tool for industry planning and decision-making. Based on a case study of the Pasquai-Porcupine forest management plan in Saskatchewan, Canada, this paper illustrates how an integrated approach to SEA can contribute to industry environmental decision-making and can enhance the quality and deliverability of industry plans.

  9. Circulation as Assessment: Collection Development Policies Evaluated in Terms of Circulation at a Small Academic Library.

    Science.gov (United States)

    Dinkins, Debbi

    2003-01-01

    Discusses the use of academic library circulation statistics to assess whether user needs are being met and describes a study at Stetson University that investigated collection development practices by comparing circulation statistics for books selected by faculty in support of departmental curricula with those of librarian selections. (Author/LRW)

  10. 78 FR 5830 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations...

    Science.gov (United States)

    2013-01-28

    ...-FXES11120800000F2-123-F2] Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... environmental assessment and proposed habitat conservation plan; request for comment. SUMMARY: We, the U.S. Fish...

  11. Environmental assessment report on proposed Yeelirrie uranium project

    International Nuclear Information System (INIS)

    1979-01-01

    In accordance with Government requirements, Western Mining Corporation Ltd. has prepared a Draft Environmental Impact Statement/Environmental Review and Management Programme for its proposed uranium mine development at Yeelirrie, Western Australia. This report includes an outline of the proposal, an enviromental assessment, recommendations by the Environmental Protection Authority made after consideration of the Company's draft statement and a review of public and State Government Departmental Submissions received on the Yeelirrie EIS/ERMP

  12. Strategic Environmental Assessment as catalyst of healthier spatial planning: The Danish guidance and practice

    International Nuclear Information System (INIS)

    Kornov, Lone

    2009-01-01

    A wide range of factors within spatial planning can affect health. There is therefore an important scope for Strategic Environmental Assessment (SEA) of spatial plans to protect and improve human health. Due to the EU Directive 2001/42/EC on SEA, health has been made explicit in Danish legislation and guidance. This paper examines the inclusion of health as a formal component in impact assessment of spatial plans. Based upon a documentary study of 100 environmental reports, the paper analyses and discusses how health impact considerations are incorporated in SEA practice. It is found that health impacts are included in SEA practice and are being interpreted in a broader sense than what the national guidance exemplifies. The frequent included health aspects are noise, drinking water, air pollution, recreation/outdoor life and traffic safety. The primary determinant for health is transport-whether it is at the overall or local planning level. The main conclusion is that SEA shows a potential to catalyse healthier spatial planning. Despite the broad inclusion of health in SEA practice the examination shows potential improvements, hereunder qualification of assessments by better explaining the nature and significance of impacts and by including the distributional aspects of human health impacts. Inclusion from the health sector is put forward as an important institutional mean to secure cross disciplinarily and higher quality assessment

  13. Assessment for active living: harnessing the power of data-driven planning and action.

    Science.gov (United States)

    Bors, Philip A; Brownson, Ross C; Brennan, Laura K

    2012-11-01

    Robert Wood Johnson Foundation's Active Living by Design (ALbD) grant program funded 25 communities across the U.S. The ALbD National Program Office (NPO) supported grantee community partnerships with technical assistance for assessment, planning, and implementation activities intended to increase population levels of physical activity. This paper analyzes and summarizes the range of assessments conducted to identify local barriers and opportunities for active living as important elements of a thorough intervention planning process. Evaluation of the partnerships focused on documenting community changes and strategies used to produce those changes. With support from NPO staff and external evaluators, partnerships tracked and summarized their community assessment approaches as well as strengths and challenges in conducting assessments. The partnerships documented a range of assessment strategies and methods. Partnerships used several qualitative methods, including focus groups, individual and group interviews, and public meetings. Quantitative methods included surveys, audits, observations, and analysis of existing data, among others. The environmental audit was the most common assessment method used by the partnerships. Assessment processes and findings were used for not only intervention planning but also community engagement and direct advocacy. Assessment data collectors varied from professional staff to community volunteers. Assessments were essential to the identification of local barriers and assets related to active living, which in turn helped ALbD partnerships prioritize and refine their action strategies. Assessment processes were also valuable in building relationships with new partners, community members, and local officials. Copyright © 2012 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.

  14. Mathematical assessment of Canada's pandemic influenza preparedness plan.

    Science.gov (United States)

    Gumel, Abba B; Nuño, Miriam; Chowell, Gerardo

    2008-03-01

    The presence of the highly pathogenic avian H5N1 virus in wild bird populations in several regions of the world, together with recurrent cases of H5N1 influenza arising primarily from direct contact with poultry, have highlighted the urgent need for prepared-ness and coordinated global strategies to effectively combat a potential influenza pandemic. The purpose of the present study was to evaluate the Canadian pandemic influenza preparedness plan. A mathematical model of the transmission dynamics of influenza was used to keep track of the population according to risk of infection (low or high) and infection status (susceptible, exposed or infectious). The model was parametrized using available Canadian demographic data. The model was then used to evaluate the key components outlined in the Canadian plan. The results indicated that the number of cases, mortalities and hospitalizations estimated in the Canadian plan may have been underestimated; the use of antivirals, administered therapeutically, prophylactically or both, is the most effective single intervention followed by the use of a vaccine and basic public health measures; and the combined use of pharmaceutical interventions (antivirals and vaccine) can dramatically minimize the burden of the pending influenza pandemic in Canada. Based on increasing concerns of Oseltamivir resistance (wide-scale implementation), coupled with the expected unavailability of a suitable vaccine during the early stages of a pandemic, the present study evaluated the potential impact of non-pharmaceutical interventions (NPIs) which were not emphasized in the current Canadian plan. To this end, the findings suggest that the use of NPIs can drastically reduce the burden of a pandemic in Canada. A deterministic model was designed and used to assess Canada's pandemic preparedness plan. The study showed that the estimates of pandemic influenza burden given in the Canada pandemic preparedness plan may be an underestimate, and that Canada

  15. IRIS Assessment Plan for Nitrate and Nitrite (Scoping and Problem Formulation Materials)

    Science.gov (United States)

    In September 2017, EPA released the draft IRIS Assessment Plan (IAP) for Nitrate and Nitrite for public review and comment. This document was discussed at an EPA Science Advisory Board (SAB) Chemical Assessment Advisory Committee (CAAC) meeting on September 27-28, 2017....

  16. Order no 058/MME/DAAF from June 13, 2003 provides for the creation, attributions and organization of Departmental Directorates, Direction of urban Niamey's communauty and Arlit's Arrondissement Service of the Ministry of Mines and Energy

    International Nuclear Information System (INIS)

    Rabiou Hassane, Yari

    2003-01-01

    This order provides for the creation, attributions and organization of Departemental Directorates, Direction of urban Niamey's communauty and Arlit's Arrondissement Service of the Ministry of Mines and Energy. It is created a Departmental Directorate of Mines and Energy into each of the following places of region: AGADEZ, DIFFA, , MARADI, TAHOUA, TILLABERI and ZINDER, and Direction of urban Niamey's communauty and Arlit's Arrondissement Service of the Ministry of Mines and Energy. Each Departmental and communal Directorate is constitued of: a service of the Geology's Research and Mining, Mines service, a Service of Electricity and new Energies and renewlables, a Service of hydrocarbures and an Administrative and Financial Service. Arrondissement Service includes: a Division of Mines and Geology, a Division of Energy and an admistrative and Financial Division. [fr

  17. Plan Your Advertising Budget.

    Science.gov (United States)

    Britt, Steuart-Henderson

    1979-01-01

    Methods for establishing an advertising budget are reviewed. They include methods based on percentage of sales or profits, unit of sales, and objective and task. Also discussed are ways to allocate a promotional budget. The most common breakdowns are: departmental budgets, total budget, calendar periods, media, and sales area. (JMD)

  18. Quality Assessment of Family Planning Services in Ife/Ijesa ...

    African Journals Online (AJOL)

    Context: Medical audit in healthcare has a goal to monitor and upgrade the standard of health care in a setting. Whether a client will accept, use effectively and continue to practice contraception depends on the quality of services rendered. Objective: To assess the quality of our family planning services as perceived by our ...

  19. Data-Driven Planning: Using Assessment in Strategic Planning

    Science.gov (United States)

    Bresciani, Marilee J.

    2010-01-01

    Data-driven planning or evidence-based decision making represents nothing new in its concept. For years, business leaders have claimed they have implemented planning informed by data that have been strategically and systematically gathered. Within higher education and student affairs, there may be less evidence of the actual practice of…

  20. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems

  1. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  2. Self-Contained versus Departmentalized School Organization and the Impact on Fourth and Fifth Grade Student Achievement in Reading and Mathematics as Determined by the Kentucky Core Content Test

    Science.gov (United States)

    Kent, Kimberly Penn

    2010-01-01

    The primary purpose of this study was to determine if there was a difference between self-contained and departmentalized classroom organization on the Kentucky Core Content Test (KCCT) in reading and mathematics for students in fourth and fifth grade. A secondary purpose of this study was to consider how these organizational structures affect the…

  3. Stalking: A Multidimensional Framework for Assessment and Safety Planning.

    Science.gov (United States)

    Logan, T K; Walker, Robert

    2015-09-03

    Despite the high prevalence of stalking and the risk of harm it poses to victims, arrest rates, prosecutions, and convictions for stalking continue to be low in the United States. The overall goal of this article is to introduce a multidimensional framework of stalking that adds to the current literature by (1) providing a conceptual framework consistent with legal elements of many stalking statutes to facilitate assessment, communication, documentation, and safety planning for stalking several victims; (2) introducing a more systematic way of assessing course of conduct and the context of fear in stalking situations in order to increase the understanding of cumulative fear for stalking victims; (3) emphasizing the aspects of stalking harm that go beyond violence and that show how harm from stalking accumulates over time including life sabotage; and (4) discussing 12 risk factors derived from the overall multidimensional framework that can be used to describe the big picture of stalking and to facilitate safety planning for victims. Implications for future research are discussed. © The Author(s) 2015.

  4. Order no 000062/MME/DAAF from June 15, 2009 provides for the creation, attributions and organization of Regional Directions, and departmental Arlit's Direction of the Ministry of Mines and Energy

    International Nuclear Information System (INIS)

    Mohamed, Abdoullahi

    2009-01-01

    This order provides for the creation, attributions and organization of Regional Directorates, and departmental Arlit's Directorate of the Ministry of Mines and Energy. It is created Regionale Directorates of Mines and Energy into each of the following places of region: Agadez, DIFFA, Dosso, Maradi, Niamey, TAHOUA, TILLABERI and ZINDER, and a Departmental Directorate of Mines and the Energy at Arlit. Each Regional Directorate is constituted of five divisions: Division of Geology, Division of Mines, Division of Energy, Division of Administration and Financial Matters, Documentation and Archives, and a division of Small Scale Operations Minieres and Careers. Regional Directorates are responsible for monitoring and control of the provisions of the Mining Code, the petroleum code and the code of the electricity and the application of all regulatory provisions relating to the sector of Mines and Energy. The Departemental Directorate includes: a service of the Geology, a service of Energy, Mines service, and service of a Small Scale Operations Minieres and Careers. [fr

  5. Assessing environmental assets for health promotion program planning: a practical framework for health promotion practitioners.

    Science.gov (United States)

    Springer, Andrew E; Evans, Alexandra E

    2016-01-01

    Conducting a health needs assessment is an important if not essential first step for health promotion planning. This paper explores how health needs assessments may be further strengthened for health promotion planning via an assessment of environmental assets rooted in the multiple environments (policy, information, social and physical environments) that shape health and behavior. Guided by a behavioral-ecological perspective- one that seeks to identify environmental assets that can influence health behavior, and an implementation science perspective- one that seeks to interweave health promotion strategies into existing environmental assets, we present a basic framework for assessing environmental assets and review examples from the literature to illustrate the incorporation of environmental assets into health program design. Health promotion practitioners and researchers implicitly identify and apply environmental assets in the design and implementation of health promotion interventions;this paper provides foundation for greater intentionality in assessing environmental assets for health promotion planning.

  6. Protecting drinkable water: an analysis of action plans and stakeholders' networks

    Science.gov (United States)

    Gascuel-Odoux, Chantal; Menard, Marjorie

    2015-04-01

    Since WFD the policy for protecting drinkable water has been enhanced in France. This policy establish the main components and the different steps for protecting drinkable water, and ask for defining and implementing an action plan for each contributing catchment. Despite ambitious objectives, the local implementation is difficult. Firstly there is a high diversity of stakeholders involved with local authorities, which are mainly: water agencies, agricultural chambers and consultants, authorities at regional and departmental levels. Most of the local authorities do not feel qualified enough for carrying out such a policy, as they are not really used to deal with technical and political issues related to agricultural diffuse pollutions. As a consequence assessed action plans are based on regulation and/or agri-environmental measures. More ambitious and complementary measures can be included, but without any support measure nor accurate objectives for their implementation. In the end, action plans reflect more a formal implementation of protection approaches than a search for efficiency by defining ambitious measures and the setting-up a consistent support scheme. The way stakeholders' networks mobilize knowledge have been analyzed based on ten case studies located in three different regions. Three local authorities profiles are defined: (1) the "passive" ones, not really convinced of the necessity to undertake actions against diffuse pollutions and/or having low level of knowledge to support local reflexion, that delegate project management; (2) the local authorities that support local protection approach but that, for different reasons, do not search for an effective action plan, and that only consider an improvement approach; (3) the local authorities that more rarely, aim at efficient actions, motivated by the urgent need of action for preserving threatened resources. According to these profiles, local authorities and their project coordinators will be looking

  7. National technology needs assessment for the preparation and implementation of climate change action plans

    Energy Technology Data Exchange (ETDEWEB)

    Berkel, C.W.M. van; Blonk, T.J.; Westra, C.A.

    1996-12-31

    In the United National Framework Convention on Climate Change (FCCC) it is recognised that developed countries have a responsibility in assisting developing countries and countries in economic transition in building a national capacity for the development, acquisition and transfer of Climate-related Technologies (CTs). Such assistance is most likely to be successful once it is tailored to the results of a sound assessment of the country`s development needs and once the results of this assessment have been endorsed by the most important stakeholders in the country. Recent insight in the opportunities and constraints for National (technology) Needs Assessments (NNAs) as planning tool for both capacity building and technology transfer regarding Environmentally Sound Technologies (ESTs) is applied here to propose a participatory Climate Change Action Planning (CCAP) process. This participatory planning process is thought to serve the dual objective of defining a national Climate Change Action Plan (CCAP) while at the same time contributing to the creation of a broad supportive basis for its acceptance and implementation among stakeholders in the developing country.

  8. Ecological risk assessment guidance for preparation of remedial investigation/feasibility study work plans

    International Nuclear Information System (INIS)

    Pentecost, E.D.; Vinikour, W.S.

    1993-08-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial assessment investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfired Amendments and Reauthorization Act of 1986 (SARA), an RI/FS work plan win have to be developed as part of the site-remediation scoping the process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites. An overview analysis of early ecological risk assessment methods (i.e., in the 1980s) at Superfund sites was conducted by the EPA (1989a). That review provided a perspective of attention given to ecological issues in some of the first RI/FS studies. By itself, that reference is of somewhat limited value; it does, however, establish a basis for comparison of past practices in ecological risk with current, more refined methods

  9. A state-impact-state methodology for assessing environmental impact in land use planning

    International Nuclear Information System (INIS)

    Chen, Longgao; Yang, Xiaoyan; Chen, Longqian; Potter, Rebecca; Li, Yingkui

    2014-01-01

    The implementation of land use planning (LUP) has a large impact on environmental quality. There lacks a widely accepted and consolidated approach to assess the LUP environmental impact using Strategic Environmental Assessment (SEA). In this paper, we developed a state-impact-state (SIS) model employed in the LUP environmental impact assessment (LUPEA). With the usage of Matter-element (ME) and Extenics method, the methodology based on the SIS model was established and applied in the LUPEA of Zoucheng County, China. The results show that: (1) this methodology provides an intuitive and easy understanding logical model for both the theoretical analysis and application of LUPEA; (2) the spatial multi-temporal assessment from base year, near-future year to planning target year suggests the positive impact on the environmental quality in the whole County despite certain environmental degradation in some towns; (3) besides the spatial assessment, other achievements including the environmental elements influenced by land use and their weights, the identification of key indicators in LUPEA, and the appropriate environmental mitigation measures were obtained; and (4) this methodology can be used to achieve multi-temporal assessment of LUP environmental impact of County or Town level in other areas. - Highlights: • A State-Impact-State model for Land Use Planning Environmental Assessment (LUPEA). • Matter-element (ME) and Extenics methods were embedded in the LUPEA. • The model was applied to the LUPEA of Zoucheng County. • The assessment shows improving environment quality since 2000 in Zoucheng County. • The method provides a useful tool for the LUPEA in the county level

  10. A state-impact-state methodology for assessing environmental impact in land use planning

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Longgao [Institute of land resources, Jiangsu Normal University, Xuzhou 221116 (China); Yang, Xiaoyan [Institute of land resources, Jiangsu Normal University, Xuzhou 221116 (China); School of Environmental Science and Spatial Informatics, China University of Mining and Technology, Xuzhou 221116 (China); Chen, Longqian, E-mail: cumt_chenlongqian@163.com [School of Environmental Science and Spatial Informatics, China University of Mining and Technology, Xuzhou 221116 (China); Potter, Rebecca; Li, Yingkui [Department of Geography, University of Tennessee, Knoxville, TN 37996 (United States)

    2014-04-01

    The implementation of land use planning (LUP) has a large impact on environmental quality. There lacks a widely accepted and consolidated approach to assess the LUP environmental impact using Strategic Environmental Assessment (SEA). In this paper, we developed a state-impact-state (SIS) model employed in the LUP environmental impact assessment (LUPEA). With the usage of Matter-element (ME) and Extenics method, the methodology based on the SIS model was established and applied in the LUPEA of Zoucheng County, China. The results show that: (1) this methodology provides an intuitive and easy understanding logical model for both the theoretical analysis and application of LUPEA; (2) the spatial multi-temporal assessment from base year, near-future year to planning target year suggests the positive impact on the environmental quality in the whole County despite certain environmental degradation in some towns; (3) besides the spatial assessment, other achievements including the environmental elements influenced by land use and their weights, the identification of key indicators in LUPEA, and the appropriate environmental mitigation measures were obtained; and (4) this methodology can be used to achieve multi-temporal assessment of LUP environmental impact of County or Town level in other areas. - Highlights: • A State-Impact-State model for Land Use Planning Environmental Assessment (LUPEA). • Matter-element (ME) and Extenics methods were embedded in the LUPEA. • The model was applied to the LUPEA of Zoucheng County. • The assessment shows improving environment quality since 2000 in Zoucheng County. • The method provides a useful tool for the LUPEA in the county level.

  11. Corporate Plan (for the National Radiological Protection Board) 1988/89 to 1992/93

    International Nuclear Information System (INIS)

    1988-04-01

    The Cabinet Office (Management and Personnel Office), when setting down guidelines, recommended that all Non-Departmental Public Bodies such as the Board should prepare Corporate Plans against which the performance of the organisation and the relevance of the activities to contemporary requirements could be better measured. To that end, the Board now prepares a Corporate Plan annually. This year's plan is for the financial period 1988/89 through to 1992/93, both years inclusive. The document indicates the broad programme areas in which the Board intends to concentrate its efforts, and the trends it expects over the planning period. The Board's overall strategy is to cover a wide range of relevant radiological protection matters, but with most emphasis on those likely to become major points of public or governmental concern in the near future. Major issues are expected to be: new estimates of the risks associated with radiation exposure and subsequent international and national recommendations on dose limitation; public exposures and aspects of radiation in the environment; and increasing awareness of non-ionising radiation. The Board is partly dependent upon receipts from its commercial activities and must, therefore, also look at the provision of services and prepare to meet the demands likely to arise in the 1990s. (author)

  12. Career Assessment and Planning Strategies for Postsecondary Students with Disabilities

    Science.gov (United States)

    Roessler, Richard T.; Hennessey, Mary L.; Hogan, Ebony M.; Savickas, Suzanne

    2009-01-01

    Career assessment and planning services that enable students with disabilities to make successful transitions from higher education to careers are an important component often missing in the postsecondary educational experience. Comprehensive services in this regard involve students in considering how to incorporate their preferences, assets, and…

  13. Landscape ecological assessment: a tool for integrating biodiversity issues in strategic environmental assessment and planning.

    Science.gov (United States)

    Mörtberg, U M; Balfors, B; Knol, W C

    2007-03-01

    To achieve a sustainable development, impacts on biodiversity of urbanisation, new infrastructure projects and other land use changes must be considered on landscape and regional scales. This requires that important decisions are made after a systematic evaluation of environmental impacts. Landscape ecology can provide a conceptual framework for the assessment of consequences of long-term development processes like urbanisation on biodiversity components, and for evaluating and visualising the impacts of alternative planning scenarios. The aim of this paper was to develop methods for integrating biodiversity issues in planning and strategic environmental assessment in an urbanising environment, on landscape and regional levels. In order to test developed methods, a case study was conducted in the region of Stockholm, the capital of Sweden, and the study area embraced the city centre, suburbs and peri-urban areas. Focal species were tested as indicators of habitat quality, quantity and connectivity in the landscape. Predictive modelling of habitat distribution in geographic information systems involved the modelling of focal species occurrences based on empirical data, incorporated in a landscape ecological decision support system. When habitat models were retrieved, they were applied on future planning scenarios in order to predict and assess the impacts on focal species. The scenario involving a diffuse exploitation pattern had the greatest negative impacts on the habitat networks of focal species. The scenarios with concentrated exploitation also had negative impacts, although they were possible to mitigate quite easily. The predictions of the impacts on habitats networks of focal species made it possible to quantify, integrate and visualise the effects of urbanisation scenarios on aspects of biodiversity on a landscape level.

  14. Emergency planning, response and assessment: a concept for a center of excellence

    International Nuclear Information System (INIS)

    Dickerson, M.H.

    1986-01-01

    This paper discusses a general concept for a center of excellence devoted to emergency planning, response and assessment. A plan is presented to implement the concept, based on experience gained from emergency response as it relates to the nuclear and toxic chemical industries. The role of the World Laboratory in this endeavor would complement and enhance other organizations than are involved in related activities

  15. Business plan to establish a CT colonography service.

    Science.gov (United States)

    Fajardo, Laurie L; Hurley, James P; Brown, Bruce P; Summers, Robert W; McDaniel, R Donald

    2006-03-01

    The authors describe the University of Iowa Department of Radiology's business planning process to initiate a new service in computed tomographic colonography (CTC). Also known as virtual colonoscopy, CTC is a noninvasive technology that offers less risk, and potentially similar sensitivity and specificity, than conventional optical colonoscopy (OC). Although not currently covered by all insurance payers, about a year ago, the Centers for Medicare and Medicaid Services instituted temporary Current Procedural Terminology codes (Category III) for CTC. In locales where the procedure is not covered by insurers, it is likely to be sought by patients willing to pay out of pocket to undergo noninvasive cancer screening as an alternative to OC. Thus, CTC could become the preferred method of colon cancer surveillance by insurance providers in the near future. In developing the business plan, the authors reviewed pertinent scientific and clinical data to evaluate the need for and efficacy of CTC. Local market data were used to estimate patient and procedure volumes and utilization. The authors modeled financial expectations with respect to return on investment on the basis of recently reported models specific to CTC, resource requirements, and the operational impact of the new service on existing hospital and departmental clinical functions. Because there are few local providers of CTC in the authors' region, the business plan also included a publicity campaign and plan to market the new service, stimulate general public interest early, and differentiate the program as a leader in applying this unique new technology to promote cancer screening. Finally, the planning committee acknowledged and accommodated needs specific to the missions of an academic medical center with respect to research and education in designing the new service.

  16. Vulnerability Assessments and Resilience Planning at Federal Facilities. Preliminary Synthesis of Project

    Energy Technology Data Exchange (ETDEWEB)

    Moss, R. H. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.; Blohm, A. J. [Univ. of Maryland, College Park, MD (United States); Delgado, A. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.; Henriques, J. J. [James Madison Univ., Harrisonburg, VA (United States); Malone, E L. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.

    2015-08-15

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before final conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and infrastructure

  17. RELAP-7 Code Assessment Plan and Requirement Traceability Matrix

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, Junsoo; Choi, Yong-joon; Smith, Curtis L.

    2016-10-01

    The RELAP-7, a safety analysis code for nuclear reactor system, is under development at Idaho National Laboratory (INL). Overall, the code development is directed towards leveraging the advancements in computer science technology, numerical solution methods and physical models over the last decades. Recently, INL has also been putting an effort to establish the code assessment plan, which aims to ensure an improved final product quality through the RELAP-7 development process. The ultimate goal of this plan is to propose a suitable way to systematically assess the wide range of software requirements for RELAP-7, including the software design, user interface, and technical requirements, etc. To this end, we first survey the literature (i.e., international/domestic reports, research articles) addressing the desirable features generally required for advanced nuclear system safety analysis codes. In addition, the V&V (verification and validation) efforts as well as the legacy issues of several recently-developed codes (e.g., RELAP5-3D, TRACE V5.0) are investigated. Lastly, this paper outlines the Requirement Traceability Matrix (RTM) for RELAP-7 which can be used to systematically evaluate and identify the code development process and its present capability.

  18. USGCRP's Sustained Assessment Process: Progress to date and future plans

    Science.gov (United States)

    DeAngelo, B. J.; Reidmiller, D.; Lipschultz, F.; Cloyd, E. T.

    2016-12-01

    One of the four main objectives of the U.S. Global Change Research Program's (USGCRP's) Strategic Plan is to "Conduct Sustained Assessments", which seeks to build a process that synthesizes and advances the state of scientific knowledge on global change, develops future scenarios and potential impacts, and evaluates how effectively science is being and can be used to inform and support the Nation's response to climate change. To do so, USGCRP strives to establish a standing capacity to conduct national climate assessments with sectoral and regional information to evaluate climate risks and opportunities, and to inform decision-making, especially with regard to resiliency planning and adaptation measures. Building on the success of the 3rd National Climate Assessment (NCA) (2014), we discuss the range of USGCRP activities that embody the sustained assessment concept. Special reports, such as the recent Climate and Human Health Assessment and upcoming Climate Science Special Report, fill gaps in our understanding and provide crucial building blocks for next NCA report (NCA4). To facilitate the use of consistent assumptions across NCA4, new scenario products for climate, population, and land use will be made available through initiatives such as NOAA's Climate Resilience Toolkit. NCA4 will be informed by user engagement to advance the customization of knowledge. The report will strive to advance our ability to quantify various risks, monetize certain impacts, and communicate the benefits (i.e., avoided impacts) of various mitigation pathways. NCAnet (a national network of climate-interested stakeholders) continues to grow and foster collaborations across levels of governance and within civil society. Finally, USGCRP continues to actively engage with other assessment processes, at international, state, city, and tribal levels, to exchange ideas and to facilitate the potential for "linked" assessments across spatial scales.

  19. School Health Index: A Self-Assessment and Planning Guide. Middle School/High School.

    Science.gov (United States)

    Barrios, Lisa C.; Burgeson, Charlene R.; Crossett, Linda; Harrykissoon, Samantha D.; Pritzl, Jane; Wechsler, Howell; Kuester, Sarah A.; Pederson, Linda; Graffunder, Corinne; Rainford, Neil; Sleet, David

    2004-01-01

    The "School Health Index" is a self-assessment and planning guide that will enable schools to: (1) identify the strengths and weaknesses of school policies and programs for promoting health and safety; (2) develop an action plan for improving student health and safety, and (3) involve teachers, parents, students, and the community in improving…

  20. Applying an improved rapid impact assessment matrix method to strategic environmental assessment of urban planning in China

    Energy Technology Data Exchange (ETDEWEB)

    Li, Wei, E-mail: weili@bnu.edu.cn; Xie, Yuanbo, E-mail: former_007@163.com; Hao, Fanghua, E-mail: fanghua@bnu.edu.cn

    2014-04-01

    Strategic environmental assessment (SEA) has become an increasingly important decision-support tool for providing information on the environmental implications of a policy, plan, or program. The goal is to safeguard the environment and promote sustainable development at the strategic level. Despite major progress in implementing SEA practices internationally, developing countries, such as China, often lag behind in applying SEA methodology. Lack of available data and time constraints arising from tight schedules create problems. The rapid impact assessment matrix (RIAM) is a potential resource for breaking through such difficulties. Our analysis of RIAM applications suggested that it could become a tool for evaluating strategic alternatives because of its applicability in interdisciplinary settings, its transparency, and its short implementation timeframe. To make it more suitable for the SEA context, we have developed two major improvements to the conventional RIAM process: assignment of weights to assessment indicators and the development of an integrated environmental assessment score (IES). The improved RIAM process was employed in an SEA of the development plan for the Nansha District in Guangzhou, the capital city of Guangdong Province in China. It was used to assess five alternatives for development in Wanqingsha (WQS), a subunit of Nansha, where important ecological resources are located and where industrial development could impact the air quality in the neighboring Hong Kong Special Administrative Region (HKSAR). The evaluation identified WQS-A04 as the preferred alternative. This alternative involved a minimal amount of industrial development – 10% compared with the most intense development alternative – and included important wetland preservation plans. The assessment results have been incorporated into the officially approved development plan for Nansha. The improved RIAM methodology is well adapted to the technical aims of SEA and decision

  1. Applying an improved rapid impact assessment matrix method to strategic environmental assessment of urban planning in China

    International Nuclear Information System (INIS)

    Li, Wei; Xie, Yuanbo; Hao, Fanghua

    2014-01-01

    Strategic environmental assessment (SEA) has become an increasingly important decision-support tool for providing information on the environmental implications of a policy, plan, or program. The goal is to safeguard the environment and promote sustainable development at the strategic level. Despite major progress in implementing SEA practices internationally, developing countries, such as China, often lag behind in applying SEA methodology. Lack of available data and time constraints arising from tight schedules create problems. The rapid impact assessment matrix (RIAM) is a potential resource for breaking through such difficulties. Our analysis of RIAM applications suggested that it could become a tool for evaluating strategic alternatives because of its applicability in interdisciplinary settings, its transparency, and its short implementation timeframe. To make it more suitable for the SEA context, we have developed two major improvements to the conventional RIAM process: assignment of weights to assessment indicators and the development of an integrated environmental assessment score (IES). The improved RIAM process was employed in an SEA of the development plan for the Nansha District in Guangzhou, the capital city of Guangdong Province in China. It was used to assess five alternatives for development in Wanqingsha (WQS), a subunit of Nansha, where important ecological resources are located and where industrial development could impact the air quality in the neighboring Hong Kong Special Administrative Region (HKSAR). The evaluation identified WQS-A04 as the preferred alternative. This alternative involved a minimal amount of industrial development – 10% compared with the most intense development alternative – and included important wetland preservation plans. The assessment results have been incorporated into the officially approved development plan for Nansha. The improved RIAM methodology is well adapted to the technical aims of SEA and decision

  2. Assessment of PlanIQ Feasibility DVH for head and neck treatment planning.

    Science.gov (United States)

    Fried, David V; Chera, Bhishamjit S; Das, Shiva K

    2017-09-01

    Designing a radiation plan that optimally delivers both target coverage and normal tissue sparing is challenging. There are limited tools to determine what is dosimetrically achievable and frequently the experience of the planner/physician is relied upon to make these determinations. PlanIQ software provides a tool that uses target and organ at risk (OAR) geometry to indicate the difficulty of achieving different points for organ dose-volume histograms (DVH). We hypothesized that PlanIQ Feasibility DVH may aid planners in reducing dose to OARs. Clinically delivered head and neck treatments (clinical plan) were re-planned (re-plan) putting high emphasis on maximally sparing the contralateral parotid gland, contralateral submandibular gland, and larynx while maintaining routine clinical dosimetric objectives. The planner was blinded to the results of the clinically delivered plan as well as the Feasibility DVHs from PlanIQ. The re-plan treatments were designed using 3-arc VMAT in Raystation (RaySearch Laboratories, Sweden). The planner was then given the results from the PlanIQ Feasibility DVH analysis and developed an additional plan incorporating this information using 4-arc VMAT (IQ plan). The DVHs across the three treatment plans were compared with what was deemed "impossible" by PlanIQ's Feasibility DVH (Impossible DVH). The impossible DVH (red) is defined as the DVH generated using the minimal dose that any voxel outside the targets must receive given 100% target coverage. The re-plans performed blinded to PlanIQ Feasibilty DVH achieved superior sparing of aforementioned OARs compared to the clinically delivered plans and resulted in discrepancies from the impossible DVHs by an average of 200-700 cGy. Using the PlanIQ Feasibility DVH led to additionalOAR sparing compared to both the re-plans and clinical plans and reduced the discrepancies from the impossible DVHs to an average of approximately 100 cGy. The dose reduction from clinical to re-plan and re-plan to

  3. Engineering Task Plan for the Integrity Assessment Examination of Double-Contained Receiver Tanks (DCRT), Catch Tanks and Ancillary facilities

    International Nuclear Information System (INIS)

    BECKER, D.L.

    2000-01-01

    This Engineering Task Plan (ETP) presents the integrity assessment examination of three DCRTs, seven catch tanks, and two ancillary facilities located in the 200 East and West Areas of the Hanford Site. The integrity assessment examinations, as described in this ETP, will provide the necessary information to enable the independently qualified registered professional engineer (IQRPE) to assess the condition and integrity of these facilities. The plan is consistent with the Double-Shell Tank Waste Transfer Facilities Integrity Assessment Plan

  4. Methodology, status and plans for development and assessment of Cathare code

    Energy Technology Data Exchange (ETDEWEB)

    Bestion, D.; Barre, F.; Faydide, B. [CEA - Grenoble (France)

    1997-07-01

    This paper presents the methodology, status and plans for the development, assessment and uncertainty evaluation of the Cathare code. Cathare is a thermalhydraulic code developed by CEA (DRN), IPSN, EDF and FRAMATOME for PWR safety analysis. First, the status of the code development and assessment is presented. The general strategy used for the development and the assessment of the code is presented. Analytical experiments with separate effect tests, and component tests are used for the development and the validation of closure laws. Successive Revisions of constitutive laws are implemented in successive Versions of the code and assessed. System tests or integral tests are used to validate the general consistency of the Revision. Each delivery of a code Version + Revision is fully assessed and documented. A methodology is being developed to determine the uncertainty on all constitutive laws of the code using calculations of many analytical tests and applying the Discrete Adjoint Sensitivity Method (DASM). At last, the plans for the future developments of the code are presented. They concern the optimization of the code performance through parallel computing - the code will be used for real time full scope plant simulators - the coupling with many other codes (neutronic codes, severe accident codes), the application of the code for containment thermalhydraulics. Also, physical improvements are required in the field of low pressure transients and in the modeling for the 3-D model.

  5. Impact assessment of land use planning driving forces on environment

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Longgao, E-mail: chenlonggao@163.com [Institute of Land Resources, Jiangsu Normal University (JSNU), Xuzhou 221116 (China); Yang, Xiaoyan [Institute of Land Resources, Jiangsu Normal University (JSNU), Xuzhou 221116 (China); School of Environment and Spatial Informatics, China University of Mining and Technology, Xuzhou 221116 (China); Chen, Longqian [School of Environment and Spatial Informatics, China University of Mining and Technology, Xuzhou 221116 (China); Li, Long [Department of Geography, Vrije Universiteit Brussel, Brussels 1050 (Belgium)

    2015-11-15

    Land use change may exert a negative impact on environmental quality. A state–impact–state (SIS) model describing a state transform under certain impacts has been integrated into land use planning (LUP) environmental impact assessment (LUPEA). This logical model is intuitive and easy to understand, but the exploration of impact is essential to establish the indicator system and to identify the scope of land use environmental impact when it is applied to a specific region. In this study, we investigated environmental driving forces from land use planning (LUPF), along with the conception, components, scope, and impact of LUPF. This method was illustrated by a case study in Zoucheng, China. Through the results, we concluded that (1) the LUPF on environment are impacts originated from the implementation of LUP on a regional environment, which are characterized by four aspects: magnitude, direction, action point, and its owner; (2) various scopes of LUPF on individual environmental elements based on different standards jointly define the final scope of LUPEA; (3) our case study in Zoucheng demonstrates the practicability of this proposed approach; (4) this method can be embedded into LUPEA with direction, magnitudes, and scopes of the LUPF on individual elements obtained, and the identified indicator system can be directly employed into LUPEA and (5) the assessment helps to identify key indicators and to set up a corresponding strategy to mitigate the negative impact of LUP on the environment, which are two important objectives of strategic environmental assessment (SEA) in LUP. - Highlights: • Environmental driving forces from land use planning (LUPF) are investigated and categorized. • Our method can obtains the direction, magnitudes and scopes of environmental driving forces. • The LUPEA scope is determined by the combination of various scopes of LUPF on individual elements. • LUPF assessment can be embedded into LUPEA. • The method can help to

  6. 76 FR 62087 - Draft Conservation Plan and Draft Environmental Assessment; Dunes Sagebrush Lizard, Texas

    Science.gov (United States)

    2011-10-06

    ...] Draft Conservation Plan and Draft Environmental Assessment; Dunes Sagebrush Lizard, Texas AGENCY: Fish... draft Texas Conservation Plan for the Dunes Sagebrush Lizard (TCP). The draft TCP will function as a... the Applicant for the dunes sagebrush lizard (Sceloporus arenicolus) throughout its range in Texas...

  7. A planning-oriented sustainability assessment framework for peri-urban water management in developing countries.

    Science.gov (United States)

    Starkl, Markus; Brunner, Norbert; López, Eduardo; Martínez-Ruiz, José Luis

    2013-12-15

    DPSIR and the three-pillar model are well-established frameworks for sustainability assessment. This paper proposes a planning-oriented sustainability assessment framework (POSAF). It is informed by those frameworks but differs insofar as it puts more emphasis on a constructivist conception which recognises that sustainability needs to be defined anew for each planning problem. In finding such a consensus definition, POSAF uses participatory scenario analysis and participatory planning, technical feasibility study, participatory assessment, analysis of trade-offs and social networks in an unusual combination and for goals that differ from the original conceptions of these methods. POSAF was applied in a peri-urban area of Mexico City for the design of improved water service provision, integrating solid waste management. It supported consensus amongst users about the importance of environmental issues, informed planners about the values of stakeholders and users, detected local differences, and identified possible conflicts at an early stage of decision-making. Copyright © 2013 Elsevier Ltd. All rights reserved.

  8. Applying comprehensive environmental assessment to research planning for multiwalled carbon nanotubes: Refinements to inform future stakeholder engagement.

    Science.gov (United States)

    Powers, Christina M; Grieger, Khara; Meacham, Connie A; Gooding, Meredith Lassiter; Gift, Jeffrey S; Lehmann, Geniece M; Hendren, Christine O; Davis, J Michael; Burgoon, Lyle

    2016-01-01

    Risk assessments and risk management efforts to protect human health and the environment can benefit from early, coordinated research planning by researchers, risk assessors, and risk managers. However, approaches for engaging these and other stakeholders in research planning have not received much attention in the environmental scientific literature. The Comprehensive Environmental Assessment (CEA) approach under development by the United States Environmental Protection Agency (USEPA) is a means to manage complex information and input from diverse stakeholder perspectives on research planning that will ultimately support environmental and human health decision making. The objectives of this article are to 1) describe the outcomes of applying lessons learned from previous CEA applications to planning research on engineered nanomaterial, multiwalled carbon nanotubes (MWCNTs) and 2) discuss new insights and refinements for future efforts to engage stakeholders in research planning for risk assessment and risk management of environmental issues. Although framed in terms of MWCNTs, this discussion is intended to enhance research planning to support assessments for other environmental issues as well. Key insights for research planning include the potential benefits of 1) ensuring that participants have research, risk assessment, and risk management expertise in addition to diverse disciplinary backgrounds; 2) including an early scoping step before rounds of formal ratings; 3) using a familiar numeric scale (e.g., US dollars) versus ordinal rating scales of "importance"; 4) applying virtual communication tools to supplement face-to-face interaction between participants; and 5) refining criteria to guide development of specific, actionable research questions. © 2015 SETAC.

  9. Savannah River Site management response plan for chemical safety vulnerability field assessment. Revision 1

    International Nuclear Information System (INIS)

    Kahal, E.J.; Murphy, S.L.; Salaymeh, S.R.

    1994-09-01

    As part of the U.S. Department of Energy's (DOE) initiative to identify potential chemical safety vulnerabilities in the DOE complex, the Chemical Safety Vulnerability Core Working Group issued a field verification assessment report. While the report concluded that Savannah River Site (SRS) is moving in a positive direction, the report also identified five chemical safety vulnerabilities with broad programmatic impact that are not easily nor quickly remedied. The May 1994 SRS Management Response Plan addressed the five SRS vulnerabilities identified in the field assessment report. The SRS response plan listed observations supporting the vulnerabilities and any actions taken or planned toward resolution. Many of the observations were resolved by simple explanations, such as the existence of implementation plans for Safety Analysis Report updates. Recognizing that correcting individual observations does not suffice in remedying the vulnerabilities, a task team was assembled to address the broader programmatic issues and to recommend corrective actions

  10. Fostering Change from Within: Influencing Teaching Practices of Departmental Colleagues by Science Faculty with Education Specialties.

    Science.gov (United States)

    Bush, Seth D; Rudd, James A; Stevens, Michael T; Tanner, Kimberly D; Williams, Kathy S

    2016-01-01

    Globally, calls for the improvement of science education are frequent and fervent. In parallel, the phenomenon of having Science Faculty with Education Specialties (SFES) within science departments appears to have grown in recent decades. In the context of an interview study of a randomized, stratified sample of SFES from across the United States, we discovered that most SFES interviewed (82%) perceived having professional impacts in the realm of improving undergraduate science education, more so than in research in science education or K-12 science education. While SFES reported a rich variety of efforts towards improving undergraduate science education, the most prevalent reported impact by far was influencing the teaching practices of their departmental colleagues. Since college and university science faculty continue to be hired with little to no training in effective science teaching, the seeding of science departments with science education specialists holds promise for fostering change in science education from within biology, chemistry, geoscience, and physics departments.

  11. Plan for the long term environmental assessment of geopressured resource development in the Louisiana Gulf Coast Region

    Energy Technology Data Exchange (ETDEWEB)

    Newchurch, E.J.; Bryan, C.F.; Harrison, D.P.; Muller, R.A.; Wilcox, R.E.; Bachman, A.L.; Newman, J.P.; Cunningham, K.J.; Hilding, R.K.; Rehage, J.A.

    1978-07-15

    Results of research to develop a plan for the long-term environmental assessment of geopressured/geothermal resource development in the Louisiana Gulf Coast region are reported. An overall view of the environmental issues facing decision-makers in the area of geopressured resource development is presented, along with a plan for monitoring potential environmental impacts. Separate assessments and plans are presented for geological effects, air and water quality, ecosystem quality, and socioeconomic and cultural considerations. (JGB)

  12. Tank waste remediation system nuclear criticality safety inspection and assessment plan

    International Nuclear Information System (INIS)

    VAIL, T.S.

    1999-01-01

    This plan provides a management approved procedure for inspections and assessments of sufficient depth to validate that the Tank Waste Remediation System (TWRS) facility complies with the requirements of the Project Hanford criticality safety program, NHF-PRO-334, ''Criticality Safety General, Requirements''

  13. How consistent is teachers’ planning, implementation, and assessment in character education?

    Directory of Open Access Journals (Sweden)

    Luh Gd Rahayu Budiarta

    2018-01-01

    Full Text Available This descriptive case study aims at investigating how teachers planned, practiced, assessed students’ character development in the classroom. The study involved 29 students of Grade 5, a classroom, and an English teacher. The instruments include classroom observation, checklist, interview guide, field note, and video recording. The obtained data were analyzed by using analysis method by Miles and Huberman (1994. The result of the research shows that there were ten characters values detected in the lesson plans, however, only 55% consistently appeared in the teaching and learning process. Teachers were found to use performance rubrics and diary to keep record on students’ character development. The interview revealed that there was reluctance regarding role of teacher in term of assessing students’ characters. This fact implies that there should be intensive training and workshop for the teachers to improve the quality of the character education practices in elementary schools in Bali.

  14. The Groundwater Performance Assessment Project Quality Assurance Plan

    International Nuclear Information System (INIS)

    Luttrell, Stuart P.

    2006-01-01

    U.S. Department of Energy (DOE) has monitored groundwater on the Hanford Site since the 1940s to help determine what chemical and radiological contaminants have made their way into the groundwater. As regulatory requirements for monitoring increased in the 1980s, there began to be some overlap between various programs. DOE established the Groundwater Performance Assessment Project (groundwater project) in 1996 to ensure protection of the public and the environment while improving the efficiency of monitoring activities. The groundwater project is designed to support all groundwater monitoring needs at the site, eliminate redundant sampling and analysis, and establish a cost-effective hierarchy for groundwater monitoring activities. This document provides the quality assurance guidelines that will be followed by the groundwater project. This QA Plan is based on the QA requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--General Provisions/Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory's Standards-Based Management System. In addition, the groundwater project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The groundwater project has determined that the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan

  15. Computerization of radiology departmental management using the personal computer: application in medium sized hospital

    International Nuclear Information System (INIS)

    Ahn, Woo Hyun

    1992-01-01

    The author developed a computer program for use in registration, monthly statistics, printing of reports, data storage and retrieval in the Radiology department. This program has been used in the Department of Radiology, MoonHwa Hospital since November 1990. This program was written in FoxBASE language, consisted of two independent subprograms, one installed in a registration computer without a printer and another in a reporting computer with a printer. The subprograms were designed to link their data by floppy disk. Each computer's hard disk contained permanent files for retrieval and temporary files for data input. All permanent files were indexed on several keywords including the patient's identification data. 1. Registration was performed easily and rapidly. 2. A monthly statistic was obtained simply. 3. Retrieval of the results of previous radiologic studies, printing of report, storage and indexing of data were achieved automatically. This program had merits of simple operation, large storage capacity, rapid retrieval speed, relative low price, easy adjustment for other hospitals. Therefore this program is considered to be an economic substitute for computerization of radiology departmental management in medium sized hospitals

  16. Integration of health into urban spatial planning through impact assessment: Identifying governance and policy barriers and facilitators

    International Nuclear Information System (INIS)

    Carmichael, Laurence; Barton, Hugh; Gray, Selena; Lease, Helen; Pilkington, Paul

    2012-01-01

    This article presents the results of a review of literature examining the barriers and facilitators in integrating health in spatial planning at the local, mainly urban level, through appraisals. Our literature review covered the UK and non UK experiences of appraisals used to consider health issues in the planning process. We were able to identify four main categories of obstacles and facilitators including first the different knowledge and conceptual understanding of health by different actors/stakeholders, second the types of governance arrangements, in particular partnerships, in place and the political context, third the way institutions work, the responsibilities they have and their capacity and resources and fourth the timeliness, comprehensiveness and inclusiveness of the appraisal process. The findings allowed us to draw some lessons on the governance and policy framework regarding the integration of health impact into spatial planning, in particular considering the pros and cons of integrating health impact assessment (HIA) into other forms of impact assessment of spatial planning decisions such as environmental impact assessment (EIA) and strategic environment assessment (SEA). In addition, the research uncovered a gap in the literature that tends to focus on the mainly voluntary HIA to assess health outcomes of planning decisions and neglect the analysis of regulatory mechanisms such as EIA and SEA. - Highlights: ► Governance and policy barriers and facilitators to the integration of health into urban planning. ► Review of literature on impact assessment methods used across the world. ► Knowledge, partnerships, management/resources and processes can impede integration. ► HIA evaluations prevail uncovering research opportunities for evaluating other techniques.

  17. An interactive water indicator assessment tool to support land use planning

    NARCIS (Netherlands)

    Hellegers, P.J.G.J.; Jansen, H.C.; Bastiaanssen, W.G.M.

    2012-01-01

    This paper presents an interactive web-based rapid assessment tool that generates key water related indicators to support decision making by stakeholders in land use planning. The tool is built on a consistent science based method that combines remote sensing with hydrological and socioeconomic

  18. A Systematic Review to Uncover a Universal Protocol for Accuracy Assessment of 3-Dimensional Virtually Planned Orthognathic Surgery.

    Science.gov (United States)

    Gaber, Ramy M; Shaheen, Eman; Falter, Bart; Araya, Sebastian; Politis, Constantinus; Swennen, Gwen R J; Jacobs, Reinhilde

    2017-11-01

    The aim of this study was to systematically review methods used for assessing the accuracy of 3-dimensional virtually planned orthognathic surgery in an attempt to reach an objective assessment protocol that could be universally used. A systematic review of the currently available literature, published until September 12, 2016, was conducted using PubMed as the primary search engine. We performed secondary searches using the Cochrane Database, clinical trial registries, Google Scholar, and Embase, as well as a bibliography search. Included articles were required to have stated clearly that 3-dimensional virtual planning was used and accuracy assessment performed, along with validation of the planning and/or assessment method. Descriptive statistics and quality assessment of included articles were performed. The initial search yielded 1,461 studies. Only 7 studies were included in our review. An important variability was found regarding methods used for 1) accuracy assessment of virtually planned orthognathic surgery or 2) validation of the tools used. Included studies were of moderate quality; reviewers' agreement regarding quality was calculated to be 0.5 using the Cohen κ test. On the basis of the findings of this review, it is evident that the literature lacks consensus regarding accuracy assessment. Hence, a protocol is suggested for accuracy assessment of virtually planned orthognathic surgery with the lowest margin of error. Copyright © 2017 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.

  19. Assessing the Sustainability Performance of Urban Plans based on Ecosystem Services

    Science.gov (United States)

    Menteşe, E. Y.; Tezer, A.

    2017-12-01

    Aiming at efficient and mindful use of natural resources while enabling social cohesion and economic development; sustainable development is one of the most emerging phenomenon in last decade. In this regard, role of urban development is critical by means of achieving sustainability since more than half of the world's population lives in cities. However, there is no solid and widely accepted approach for sustainability assessment in land use planning because there is not enough evidence on the relation between land use plans and environmental sustainability. With the basic aim of setting up relation between environmental sustainability and urban plans, this study utilizes ecosystem services phenomenon to define sustainability performance of a land use plan. Since ecosystem services can easily be related with land cover and land use they can be used as an efficient tool to act as indicators of sustainability. Meanwhile, while urban plans can provide ecosystem services and their level of service provision can be quantified, this is not solely enough for understanding its sustainability. Because it is also known that a land use plan mostly has negative impact on sustainability. Hence, this study embraces land use plans as a source of ecosystem services and environmental impacts. The difference between these entities are assumed to be the sustainability performance of a plan. The analysis relies on four parameters: ecosystem service capacity (environmental impact capacity), areal quantity of a land cover / use function, fragmantation level of the land use / cover and weight of ecosystem services / environmental impacts. Lastly, this approach is adopted for Istanbul's environmental master plan of 2009 and actual land cover of the same period. By calculating both data's environmental performance, the change of sustainability level sourced from environmental plan is analyzed.

  20. Treatment planning capability assessment of a beam shaping assembly for accelerator-based BNCT

    International Nuclear Information System (INIS)

    Herrera, M.S.; González, S.J.; Burlon, A.A.; Minsky, D.M.; Kreiner, A.J.

    2011-01-01

    Within the frame of an ongoing project to develop a folded Tandem-Electrostatic-Quadrupole accelerator facility for Accelerator-Based Boron Neutron Capture Therapy (AB-BNCT) a theoretical study was performed to assess the treatment planning capability of different configurations of an optimized beam shaping assembly for such a facility. In particular this study aims at evaluating treatment plans for a clinical case of Glioblastoma.

  1. Advantages of integrated and sustainability based assessment for metabolism based strategic planning of urban water systems.

    Science.gov (United States)

    Behzadian, Kourosh; Kapelan, Zoran

    2015-09-15

    Despite providing water-related services as the primary purpose of urban water system (UWS), all relevant activities require capital investments and operational expenditures, consume resources (e.g. materials and chemicals), and may increase negative environmental impacts (e.g. contaminant discharge, emissions to water and air). Performance assessment of such a metabolic system may require developing a holistic approach which encompasses various system elements and criteria. This paper analyses the impact of integration of UWS components on the metabolism based performance assessment for future planning using a number of intervention strategies. It also explores the importance of sustainability based criteria in the assessment of long-term planning. Two assessment approaches analysed here are: (1) planning for only water supply system (WSS) as a part of the UWS and (2) planning for an integrated UWS including potable water, stormwater, wastewater and water recycling. WaterMet(2) model is used to simulate metabolic type processes in the UWS and calculate quantitative performance indicators. The analysis is demonstrated on the problem of strategic level planning of a real-world UWS to where optional intervention strategies are applied. The resulting performance is assessed using the multiple criteria of both conventional and sustainability type; and optional intervention strategies are then ranked using the Compromise Programming method. The results obtained show that the high ranked intervention strategies in the integrated UWS are those supporting both water supply and stormwater/wastewater subsystems (e.g. rainwater harvesting and greywater recycling schemes) whilst these strategies are ranked low in the WSS and those targeting improvement of water supply components only (e.g. rehabilitation of clean water pipes and addition of new water resources) are preferred instead. Results also demonstrate that both conventional and sustainability type performance indicators

  2. An Assessment for Emergency Preparedness Plan in Hanul Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Park, Sunghyun; Jae, Moosung [Hanyang University, Seoul (Korea, Republic of)

    2016-10-15

    The purpose of emergency preparedness aims to protect the accident and mitigate the radiation damage of public by setting emergency preparedness plan. In order to perform successfully the emergency preparedness plan, it should be optimized through a quantitative analysis. There are so many variables to analyze it quantitatively. It is mission to classify a realistic and suitable variables among these variables. The realistic variables is converted to the decision node in decision tree which is helpful to decide what evacuation or sheltering is effective to mitigate public damage. Base on it, it's idealistic method to analyze offsite consequences for each end points in the decision tree. In this study, we selected the reference plant which already has the emergency preparedness plan. Among the plan, we implemented offsite consequence analysis for a specific plan by using MACCS 2 code. In this study, target group is people who gathered in place 1 have sheltered and evacuated along the pathway. the offsite consequences analysis result of the group are 1.17·10-9 (early fatality), 1.77·10-7 (late fatality). Various cases need to be quantified for make an optimized decision. In the future, we will perform the verification and modification of decision node. After The assessment of emergency preparedness plan for Hanul nuclear power plant unit 5, 6 might be contribute to establish the optimized decision making of emergency prepared plan.

  3. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    International Nuclear Information System (INIS)

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE's preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public's role in helping DOE and the EPA to make the final decision on a remedy

  4. The DOE policy for protection against radiological and toxicological sabotage

    International Nuclear Information System (INIS)

    Hassell, C. Jr.; Callahan, S.; Myers, D.

    1995-01-01

    In response to a Department of Energy Office of Security Evaluations study on radiological and toxicological sabotage, the Under Secretary of Energy has directed that all departmental elements initiate analyses to determine the extent of radiological and toxicological sabotage threats within the department. To accomplish this, a plan was adopted whereby radioactive and other hazardous materials at DOE sites would be assessed by an interdisciplinary team as to quantities, ranked according to their hazards, subjected to a vulnerability assessment, and appropriate upgrades selected and monitored. This paper is a discussion of those efforts

  5. Functional Behavioral Assessments and Behavior Support Plans for Work-Based Learning

    Science.gov (United States)

    Kittelman, Angus; Wagner Bromley, Katherine; Mazzotti, Valerie L.

    2016-01-01

    Work experiences are linked to positive post-school outcomes for youth and young adults with disabilities. Unfortunately, students who struggle to manage conflict and challenges in work settings have a difficult time maintaining employment. Though ecological assessments are used to create supported work plans surrounding socially inappropriate…

  6. An assessment of implementation and evaluation phases of strategic plans in Iranian hospitals.

    Science.gov (United States)

    Sadeghifar, Jamil; Tofighi, Shahram; Roshani, Mohamad; Toulideh, Zahra; Mohsenpour, Seyedramezan; Jafari, Mehdi

    2017-01-01

    To assess the implementation and evaluation phases of strategic plans in selected hospitals. We conducted a cross-sectional study of implementation and evaluation of strategic plan in 24 hospitals in 2015, using a questionnaire which consisted of two separate sections for strategic implementation and strategic evaluation. Data were analyzed with SPSS version 18. Nearly one-third of hospitals claimed that they allocate their budget based on priorities and strategic goals. However, it turned out that although goals had been set, no formal announcements had been made. Most of the hospitals stated that they used measures when evaluating the plan. For hospital staff, clarifying the hospital's priorities was the most important advantage of a strategic plan. There is no clear definition for strategic management in Iranian hospitals, which results in chaotic implementation and control of strategic planning.

  7. A GIS-based human health risk assessment for urban green space planning--an example from Grugliasco (Italy).

    Science.gov (United States)

    Poggio, Laura; Vrscaj, Borut

    2009-11-15

    The need to develop approaches for risk-based management of soil contamination, as well as the integration of the assessment of the human health risk (HHR) due to the soil contamination in the urban planning procedures has been the subject of recent attention of scientific literature and policy makers. The spatial analysis of environmental data offers multiple advantages for studying soil contamination and HHR assessment, facilitating the decision making process. The aim of this study was to explore the possibilities and benefits of spatial implementation of a quantitative HHR assessment methodology for a planning case in a typical urban environment where the soil is contaminated. The study area is located in the city of Grugliasco a part of the Turin (Italy) metropolitan area. The soils data were derived from a site specific soil survey and the land-use data from secondary sources. In the first step the soil contamination data were geo-statistically analysed and a spatial soil contamination data risk modelling procedure designed. In order to spatially assess the HHR computer routines were developed using GIS raster tools. The risk was evaluated for several different land uses for the planned naturalistic park area. The HHR assessment indicated that the contamination of soils with heavy metals in the area is not sufficient to induce considerable health problems due to typical human behaviour within the variety of urban land uses. An exception is the possibility of direct ingestion of contaminated soil which commonly occurs in playgrounds. The HHR evaluation in a planning case in the Grugliasco Municipality confirms the suitability of the selected planning option. The construction of the naturalistic park presents one solution for reducing the impacts of soil contamination on the health of citizens. The spatial HHR evaluation using GIS techniques is a diagnostic procedure for assessing the impacts of urban soil contamination, with which one can verify planning

  8. Marketing strategies in a sensemaking perspective: Theoretical aspects

    DEFF Research Database (Denmark)

    Madsen, Charlotte Øland

    2000-01-01

    It is suggested in this paper that through an analysis of sensemaking processes on the individual, departmental, organisational and corporate levels in the organisation it will be possible to identify critical success factors in strategic sales and marketing planning and goal realisation. The con......It is suggested in this paper that through an analysis of sensemaking processes on the individual, departmental, organisational and corporate levels in the organisation it will be possible to identify critical success factors in strategic sales and marketing planning and goal realisation...... the marketing strategic critical success factors, to improve their competitiveness....

  9. Planning and Development of Wind Farms: Wind Resource Assessment and Siting

    DEFF Research Database (Denmark)

    Mortensen, Niels Gylling

    These course notes are intended for the three-week course 45700 Planning and Development of Wind Farms given at the Technical University of Denmark. The purpose of the course notes is to give an introduction to wind resource assessment and siting issues using the WAsP suite of programs....

  10. Planning and Development of Wind Farms: Wind Resource Assessment and Siting

    DEFF Research Database (Denmark)

    Mortensen, Niels Gylling

    These course notes are intended for the three-week course 46200 Planning and Development of Wind Farms given at the Technical University of Denmark. The purpose of the course notes is to give an introduction to wind resource assessment and siting issues using the WAsP suite of programs....

  11. Adapting to the Changing Climate: An Assessment of Local Health Department Preparations for Climate Change-Related Health Threats, 2008-2012.

    Science.gov (United States)

    Roser-Renouf, Connie; Maibach, Edward W; Li, Jennifer

    2016-01-01

    Climate change poses a major public health threat. A survey of U.S. local health department directors in 2008 found widespread recognition of the threat, but limited adaptive capacity, due to perceived lack of expertise and other resources. We assessed changes between 2008 and 2012 in local public health departments' preparedness for the public health threats of climate change, in light of increasing national polarization on the issue, and widespread funding cutbacks for public health. A geographically representative online survey of directors of local public health departments was conducted in 2011-2012 (N = 174; response rate = 50%), and compared to the 2008 telephone survey results (N = 133; response rate = 61%). Significant polarization had occurred: more respondents in 2012 were certain that the threat of local climate change impacts does/does not exist, and fewer were unsure. Roughly 10% said it is not a threat, compared to 1% in 2008. Adaptation capacity decreased in several areas: perceived departmental expertise in climate change risk assessment; departmental prioritization of adaptation; and the number of adaptation-related programs and services departments provided. In 2008, directors' perceptions of local impacts predicted the number of adaptation-related programs and services their departments offered, but in 2012, funding predicted programming and directors' impact perceptions did not. This suggests that budgets were constraining directors' ability to respond to local climate change-related health threats. Results also suggest that departmental expertise may mitigate funding constraints. Strategies for overcoming these obstacles to local public health departments' preparations for climate change are discussed.

  12. Assessing and Planning Health Actions During a Crisis

    Directory of Open Access Journals (Sweden)

    Selim SUNER

    2015-10-01

    Full Text Available SUMMARY: Initial stage of a disaster is managed with existing resources. The following stages of disaster response often involve assistance from outside of the disaster zone. This may consist of mutual aid from neighboring communities for small-scale incidents but in major disasters, the response is from federal or international agencies or often both. Rapid needs assessment after an incident is a collaborative effort between responding agencies and local emergency preparedness and health authorities. Ideally, a team from responding agencies with intimate knowledge and experience regarding the capabilities and assets of the responding entity along with local authorities, with decision making capacity, who have knowledge of the community, the limitations of the responding agencies and can obtain near real-time information about the incident and subject matter experts (engineering, medical, law enforcement, etc. comprise the needs assessment team. Keywords: Crisis, health action, disaster planning

  13. Assessment of Understanding: Student Teachers' Preparation, Implementation and Reflection of a Lesson Plan for Science

    Science.gov (United States)

    Juhler, Martin Vogt

    2017-05-01

    Research finds that student teachers often fail to make observable instructional goals, without which a secure bridge between instruction and assessment is precluded. This is one reason that recent reports state that teacher education needs to become better at helping student teachers to develop their thinking about and skills in assessing pupils' learning. Currently in Europe, the Lesson Study method and the Content Representation tool, which both have a specific focus on assessment, have started to address this problem. This article describes and discusses an intervention in which Lesson Study was used in combination with Content Representation in student teachers' field practice. Empirical materials from one group of student teachers were analyzed to illustrate how the student teachers worked with assessment during the planning of a lesson, how they implemented it in a research lesson, and how they used the gathered observations to make claims about assessment aims. The findings suggest that the student teachers placed greater emphasis on assessment through the intervention. However, it is also found that more attention should have been dedicated to the planning phase and that the group did not manage to keep a research focus throughout the Lesson Study process. This suggests that it properly would be beneficial with several planning sessions prior to the research lesson, as well as having an expert teacher leading the Lesson Study.

  14. Treatment planning capability assessment of a beam shaping assembly for accelerator-based BNCT.

    Science.gov (United States)

    Herrera, M S; González, S J; Burlon, A A; Minsky, D M; Kreiner, A J

    2011-12-01

    Within the frame of an ongoing project to develop a folded Tandem-Electrostatic-Quadrupole accelerator facility for Accelerator-Based Boron Neutron Capture Therapy (AB-BNCT) a theoretical study was performed to assess the treatment planning capability of different configurations of an optimized beam shaping assembly for such a facility. In particular this study aims at evaluating treatment plans for a clinical case of Glioblastoma. Copyright © 2011 Elsevier Ltd. All rights reserved.

  15. River Protection Project waste feed delivery program technical performance measurement assessment plan

    International Nuclear Information System (INIS)

    O'TOOLE, S.M.

    1999-01-01

    This plan establishes a formal technical performance-monitoring program. Technical performance is assessed by establishing requirements based performance goals at the beginning of a program and routinely evaluating progress in meeting these goals at predetermined milestones throughout the project life cycle

  16. Final Environmental Assessment Addressing Implementation of the Integrated Natural Resources Management Plan for Kirtland Air Force Base

    Science.gov (United States)

    2014-09-01

    e.g., photovoltaic panels, solar collection, heat recovery systems, wind turbines , green roofs, and habitat-oriented storm water management) would...comprehensive range planning, cultural resources management planning, Bird /Wildlife Aircraft Strike Hazard planning, and pest management planning. In addition...manage wildlife resources. Assessment of wildlife populations at Kirtland AFB (e.g., bats, birds , predators, and herptiles) would provide a baseline that

  17. 75 FR 1115 - Invitation for Public Comment on Strategic Research Direction, Research Priority Areas and...

    Science.gov (United States)

    2010-01-08

    .... The RD&T strategic planning process is collaborative, cross-modal, and forward looking, focusing on... strategic planning effort that will guide the Department's research, development, and technology activities... planning process to cover the years 2010-2015 and to address the proposed Departmental key priorities as...

  18. Environmental screening tools for assessment of infrastructure plans based on biodiversity preservation and global warming (PEIT, Spain)

    International Nuclear Information System (INIS)

    Garcia-Montero, Luis G.; Lopez, Elena; Monzon, Andres; Otero Pastor, Isabel

    2010-01-01

    Most Strategic Environmental Assessment (SEA) research has been concerned with SEA as a procedure, and there have been relatively few developments and tests of analytical methodologies. The first stage of the SEA is the 'screening', which is the process whereby a decision is taken on whether or not SEA is required for a particular programme or plan. The effectiveness of screening and SEA procedures will depend on how well the assessment fits into the planning from the early stages of the decision-making process. However, it is difficult to prepare the environmental screening for an infrastructure plan involving a whole country. To be useful, such methodologies must be fast and simple. We have developed two screening tools which would make it possible to estimate promptly the overall impact an infrastructure plan might have on biodiversity and global warming for a whole country, in order to generate planning alternatives, and to determine whether or not SEA is required for a particular infrastructure plan.

  19. Strategic environmental assessment and national development plans in Turkey: Towards legal framework and operational procedure

    International Nuclear Information System (INIS)

    Say, Nuriye Peker; Yuecel, Muzaffer

    2006-01-01

    National development plans were started to be prepared in Turkey in 1963. These plans are mandatory for public investments and guiding principles for private investments. They have a quality which guides and sets objectives for other plans in the country. Therefore, they can be evaluated as the main reason of successes and failures of sectoral investments or the problems that they cause directly or indirectly. Turkey is undergoing rapid industrialization, urbanization and population growth, thus environmental problems are on the increase. Although Environmental Impact Assessment (EIA) has been applied to individual investments in Turkey since 1993, natural environment has continued to be affected because of human activities. Today, parallel to the developments in the world, it has been discussed that it is necessary to strengthen project-level Environmental Assessment (EA) and to practice Strategic Environmental Assessment (SEA). The interest in SEA, that is, EA at the level of proposed policies, plans and programs has grown significantly since 2000 in the country. Discussions and preparations have started about regulation which provides the legal and institutional framework for SEA in The Ministry of Environment and Forestry. However, since the scientific approach into the subject is very new in Turkey, it will take time to answer the questions about how and in what fields to practice. This research project aims at analyzing the possible practice opportunities of SEA in Turkey and the practicability of SEA into the National Five-Year Development Plan (FYDP) which is assumed at the highest level of planning hierarchy in the country. The research is conducted on two sections. In the first section, procedural approaches to SEA on national development plans are investigated and a framework for these approaches is adapted at the institutional level. In the second section, SEA form for energy sector in the development plans is developed. In this article, the findings

  20. Spatial decision support for strategic environmental assessment of land use plans. A case study in southern Italy

    International Nuclear Information System (INIS)

    Geneletti, Davide; Bagli, Stefano; Napolitano, Paola; Pistocchi, Alberto

    2007-01-01

    This paper presents and discusses the construction of a spatial decision-support tool for the Strategic Environmental Assessment (SEA) of a land use plan: the spatial coordination plan of the Province of Naples, in southern Italy. The decision-support tool organises the relevant information, spatially resolves the actions of the plan, predicts their environmental impacts, and generates overall performance maps. Its final goal is to provide a suitable technical support to a formal SEA procedure. The expected implications of the plan, such as changes in land use and traffic flows and urban expansion, were modelled and assessed against a set of environmental criteria using SWOT (Strengths, Weaknesses, Opportunities and Threats) analysis and mapping. It was found that the SWOT analysis provided a good basis for assessment and strategy formulation. The paper also intends to contribute to the topic of data and scale issues in SEA, by exemplifying the role played by spatial data and spatial analyses to support informative SEA

  1. Considerations on comprehensive risk assessment and mitigation planning of volcanic ash-fall

    International Nuclear Information System (INIS)

    Toshida, Kiyoshi

    2010-01-01

    Volcanic ash-fall is inevitable hazard throughout Japan, and causes wide range of effects due to its physical and chemical properties. Nuclear power plants in Japan face the necessity to assess the risk from volcanic ash-fall. Risk assessment of the volcanic ash-fall should include engineering solution and mitigation planning as well as the ash-fall hazard. This report points out the characteristics for reducing the various effects of volcanic ash-fall as follows. Large-scale eruptions produce prominent volcanic ash-falls that can approach power plants at a great distance. Aftermath hazards of ash-fall events, such as remobilization of fine ash particles and generation of lahars, require further assessments. The kind and extent of damages becomes greater whenever ash is wet. Wet ash requires separate assessments in contrast to dry ash. The mitigation and recovery measures at power plants involve quick cleanup operations of volcanic ash. Those operations should be prepared through comprehensive risk assessment, and by cooperation with authorities, during pre-eruption repose period. The comprehensive assessment for volcanic ash-fall hazards, however, has yet to be conducted. Development of risk communication method may result in increased implementation mitigation planning. Numerical analysis of the ash-fall hazards provides quantitative data on particle motions that can be used in the risk assessment. In order to implement the quantitative assessment method, the verification on the effect of ambient air condition to the altitude of volcanic ash cloud is necessary. We need to develop a three-dimensional model of volcanic ash cloud, and calculate motions of ash clouds under multiple conditions of ambient air. (author)

  2. Debriefing to Improve Student Ability to Assess and Plan for the Care of Persons With Disability.

    Science.gov (United States)

    Takeda, Mikiko Y; Smith, Mark J; Cone, Catherine J

    2017-12-01

    Although recent literature suggests that students should be trained in the care of persons with disability (PWDs) as a form of cultural sensitivity (CS), healthcare professionals may receive limited experience during their formal training. After pharmacy students in 2 previous years of testing failed to adequately assess and plan for the care of a standardized patient's chief complaint and disability in an Objective Structured Clinical Examination (OSCE), the investigators added debriefing to the OSCE to determine if it would improve student's ability to assess and plan for the care of PWD. Two sequentially enrolled second-year pharmacy school student cohorts participated in this study (control n = 90; intervention n = 82). During the OSCE, students interviewed and examined a standardized patient with a simulated physical disability and other chronic disease states. Students were then instructed to develop a care plan considering the patient's disability and other disease states. The intervention cohort received debriefing; the control did not. Students documented the care plan in a subjective, objective, assessment, and plan (SOAP) note. Investigators assessed SOAP note score (general ability of students to write a SOAP note) and CS score (specific ability to care for PWD) to determine the effectiveness of the debriefing. The intervention group showed a significantly higher percent mean CS score than the control group (93.6% ± 19% and 61.1% ± 30.7%, respectively, P improvement in pass rates (those students scoring ≥70% on the OSCE) of 59.4% with 92.7% of the students passing in the intervention group versus 33.3% of the students passing in the control group (P improved students' performance in developing care plans for disabled patients. Ideally, longitudinal studies should be completed to determine if these skills transfer from debriefings to clinical practice. Development of effective training and assessment methods is essential for students to obtain

  3. Stochastic Assessments of Urban Employees’ Pension Plan of China

    Directory of Open Access Journals (Sweden)

    Yueqiang Zhao

    2018-03-01

    Full Text Available In the uncertain environment of population and economy; the pension plan for urban employees in China is under threat from various types of financial risk. This paper mainly builds a comprehensive risk assessment system to evaluate the solvency sustainability of the urban employees’ pension plan of China. Specifically, we forecast annual accumulative net asset; actuarial balance; and potential support ratio for the next seventy years. To account for the impact of demographic uncertainty on long-term finances, stochastic simulations are used to estimate the probability distribution of relative risk indicators. Moreover, we integrate the Lee–Carter model into the population projection. According to the median projection, the public pension fund will have a gap in about 35 years; and the cash flow will be negative about 25 years later. Furthermore, under the existing policy, the burden of insured employees will increase rapidly. Delayed retirement could relieve the coming solvency risk, but it does not fundamentally resolve the solvency problem in the long run.

  4. Ecocity mapping using GIS: introducing a planning method for assessing and improving neighborhood vitality.

    Science.gov (United States)

    Smith, Richard; Miller, Kirstin

    2013-01-01

    Assessing neighborhood vitality is important to understanding how to improve quality of life and health outcomes. The ecocity model recognizes that cities are part of natural systems and favors walkable neighborhoods. This article introduces ecocity mapping, an innovative planning method, to the public health literature on community engagement by describing a pilot project with a new affordable housing development in Oakland, California between 2007 and 2009. Although ecocity mapping began as a paper technology, advances in geographic information systems (GIS) moved it forward. This article describes how Ecocity Builders used GIS to conduct ecocity mapping to (1) assess vitality of neighborhoods and urban centers to prioritize community health intervention pilot sites and (2) create scenario maps for use in community health planning. From fall 2007 to summer 2008, Ecocity Builders assessed neighborhood vitality using walking distance from parks, schools, rapid transit stops, grocery stores, and retail outlets. In 2008, ecocity maps were shared with residents to create a neighborhood health and sustainability plan. In 2009, Ecocity Builders developed scenario maps to show how changes to the built environment would improve air quality by reducing greenhouse gas emissions from vehicles, while increasing access to basic services and natural amenities. Community organizing with GIS was more useful than GIS alone for final site selection. GIS was useful in mapping scenarios after residents shared local neighborhood knowledge and ideas for change. Residents were interested in long-term environmental planning, provided they could meet immediate needs.

  5. DEVELOPMENT AND IMPROVEMENT OF BUSINESS HIGHER EDUCATION THROUGH IMPLEMENTATION OF STUDENTS LEARNING OUTCOMES ASSESSMENT PLAN (SLOAP

    Directory of Open Access Journals (Sweden)

    Zoran Ivanovski

    2013-03-01

    Full Text Available This study presents new vision how to upgrade business higher education at the Faculty of Economics at University of Tourism and Management in Skopje (UTMS. This paper is result of analyses of best practices of leading higher education institutions as well authors experience in higher education and business education and practice. The UTMS is orientated to introduce best practices and objective standards in order to offer high-quality business education for its students. UTMS has mission for permanent implementation of quality improvement measures as a way to achieve high professional and academic standards and become part of prosperous and respective Universities. In order to achieve this goal, UTMS plan to use additional measures, outcomes assessment as a way to measure institutional effectiveness, as well as effective technique for identifying where changes and improvements are necessary. UTMS has developed Students Learning Outcomes Assessment Plan (SLOAP as a way to reach this goal.Based on permanent analysis of students needs as well as business sector suggestions about desirable level of knowledge, skills and competence of the students from Faculty of Economics, gained from conducted evaluations, UTMS decide to make additional improvement and development of business education. This process have 4 phases: 1 evaluation of students attitude towards curricula and the instructors efficiency, 2preparation of the SLOAP (Student Learning Outcomes Assessment Plan document, 3 implementation of two direct measures from the SLOAP through assessment analysis and action planning, and 4 monitoring changes and improvements made as a result of action planning.The first phase was completed in spring semester 2012, as well as second one with development of Comprehensive Exam and Capstone Course as direct measures. Complete SLOAP also has indirect measures like student satisfaction inventory, course evaluations, alumni, and employers’ surveys, and a

  6. Breckinridge Project, initial effort. Report VII, Volume 4. Safety and health plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    The Safety and Health Plan recognizes the potential hazards associated with the Project and has been developed specifically to respond to these risks in a positive manner. Prevention, the primary objective of the Plan, starts with building safety controls into the process design and continues through engineering, construction, start-up, and operation of the Project facilities and equipment. Compliance with applicable federal, state, and local health and safety laws, regulations, and codes throughout all Project phases is required and assured. The Plan requires that each major Project phase be thoroughly reviewed and analyzed to determine that those provisions required to assure the safety and health of all employees and the public, and to prevent property and equipment losses, have been provided. The Plan requires followup on those items or situations where corrective action needs were identified to assure that the action was taken and is effective. Emphasis is placed on loss prevention. Exhibit 1 provides a breakdown of Ashland Synthetic Fuels, Inc.'s (ASFI's) Loss Prevention Program. The Plan recognizes that the varied nature of the work is such as to require the services of skilled, trained, and responsible personnel who are aware of the hazards and know that the work can be done safely, if done correctly. Good operating practice is likewise safe operating practice. Training is provided to familiarize personnel with good operational practice, the general sequence of activities, reporting requirements, and above all, the concept that each step in the operating procedures must be successfully concluded before the following step can be safely initiated. The Plan provides for periodic review and evaluation of all safety and loss prevention activities at the plant and departmental levels.

  7. 49 CFR 501.8 - Delegations.

    Science.gov (United States)

    2010-10-01

    ... monetary settlement in an amount of $100,000 or less resulting from a violation of any of these chapters... Administrator for Planning, Evaluation, and Budget; the Chief Information Officer; and the Director of... direct the NHTSA planning and evaluation system in conjunction with Departmental requirement and planning...

  8. Reviewing the quality of strategic environmental assessment reports for English spatial plan core strategies

    International Nuclear Information System (INIS)

    Fischer, Thomas B.

    2010-01-01

    This paper summarises the results of a research project from early 2008, involving the author of this paper, as well as 18 post-graduate University of Liverpool students, in which the quality of European Directive based strategic environmental assessment (SEA) reports of English spatial plan core strategies (conducted within the context of the spatial planning sustainability appraisal-SA-regime) was reviewed. The project aimed at establishing the extensiveness of emerging spatial plan related SEA practice, as well as highlighting shortcomings and problems. Overall, it was found that whilst some aspects of assessment were done well, others were not of a satisfactory quality. Shortcomings were connected particularly with the practice of listing potentially relevant baseline documents and data without distinguishing sufficiently between those that are important in terms of significant impacts and those that are not. Problems were also found to exist with the evaluation of options and impacts, the consideration of substantive aspects, such as health, as well as regarding the formulation of final recommendations and monitoring.

  9. RELAP-7 Software Verification and Validation Plan - Requirements Traceability Matrix (RTM) Part 2: Code Assessment Strategy, Procedure, and RTM Update

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, Jun Soo [Idaho National Lab. (INL), Idaho Falls, ID (United States); Choi, Yong Joon [Idaho National Lab. (INL), Idaho Falls, ID (United States); Smith, Curtis Lee [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-09-01

    This document addresses two subjects involved with the RELAP-7 Software Verification and Validation Plan (SVVP): (i) the principles and plan to assure the independence of RELAP-7 assessment through the code development process, and (ii) the work performed to establish the RELAP-7 assessment plan, i.e., the assessment strategy, literature review, and identification of RELAP-7 requirements. Then, the Requirements Traceability Matrices (RTMs) proposed in previous document (INL-EXT-15-36684) are updated. These RTMs provide an efficient way to evaluate the RELAP-7 development status as well as the maturity of RELAP-7 assessment through the development process.

  10. Clinical trials radiotherapy treatment plan review software : is this the first quantified assessment

    International Nuclear Information System (INIS)

    Hatton, J.A.; Cornes, D.A.

    2011-01-01

    Full text: Clinical trials require robust quality assurance (QA) procedures to ensure commonality of all treatments, with independent reviews to assess compliance with trial protocols. All clinical trials tools, including QA software, require testing for validity and reliability. enabling inter- and intra-trial comparison. Unlike clinical radiotherapy treatment planning (RTP) systems, review software has no published guidelines. This study describes the design and development of a test suite to quantify the performance of review software in TROG clinical trials. Test areas are image handling and reconstruction; geometric accuracy; dosimetric accuracy; dose-volume histogram (DVH) calculation; display of plan parameters. TROG have developed tests for commissioning plan review software, assessed with SWAN 2.3, and CMS Elekta FocalPro. While image handling tests were based on published guidelines for RTP systems, dosimetric tests used the TROG QA case review requirements. Treatment plans represented systems of all manufacturers (Pinnacle, Eclipse, Xio and Oncentra) used in Australasian centres. The test suite identified areas for SW A software development, including the DVH algorithm, changed to reduce calculation time. Results, in Fig. I, for known volumes of varying shapes and sizes, demonstrate differences between SWAN 2.1 and 2.3 when compared with Eclipse. Liaison with SWAN programmers enabled re-instatement of 2.1 algorithm. The test suite has quantified the RTP review software, prioritised areas for development with the programmers, and improved the user experience.

  11. SU-F-T-241: Reduction in Planning Errors Via a Process Control Developed Using the Eclipse Scripting API

    Energy Technology Data Exchange (ETDEWEB)

    Barbee, D; McCarthy, A; Galavis, P; Xu, A [NYU Langone Medical Center, New York, NY (United States)

    2016-06-15

    Purpose: Errors found during initial physics plan checks frequently require replanning and reprinting, resulting decreased departmental efficiency. Additionally, errors may be missed during physics checks, resulting in potential treatment errors or interruption. This work presents a process control created using the Eclipse Scripting API (ESAPI) enabling dosimetrists and physicists to detect potential errors in the Eclipse treatment planning system prior to performing any plan approvals or printing. Methods: Potential failure modes for five categories were generated based on available ESAPI (v11) patient object properties: Images, Contours, Plans, Beams, and Dose. An Eclipse script plugin (PlanCheck) was written in C# to check errors most frequently observed clinically in each of the categories. The PlanCheck algorithms were devised to check technical aspects of plans, such as deliverability (e.g. minimum EDW MUs), in addition to ensuring that policy and procedures relating to planning were being followed. The effect on clinical workflow efficiency was measured by tracking the plan document error rate and plan revision/retirement rates in the Aria database over monthly intervals. Results: The number of potential failure modes the PlanCheck script is currently capable of checking for in the following categories: Images (6), Contours (7), Plans (8), Beams (17), and Dose (4). Prior to implementation of the PlanCheck plugin, the observed error rates in errored plan documents and revised/retired plans in the Aria database was 20% and 22%, respectively. Error rates were seen to decrease gradually over time as adoption of the script improved. Conclusion: A process control created using the Eclipse scripting API enabled plan checks to occur within the planning system, resulting in reduction in error rates and improved efficiency. Future work includes: initiating full FMEA for planning workflow, extending categories to include additional checks outside of ESAPI via Aria

  12. Assessing Technical and Programmatic Viability of Nuclear Waste and Material Stream Disposition Plans

    International Nuclear Information System (INIS)

    R. S. Hill; B. Griebenow

    1999-01-01

    The U.S. Department of Energy (DOE), Office of Environmental Management (EM) has responsibility for cleanup and disposition of nuclear wastes and excess materials that are a legacy of the nuclear arms race. In fulfilling this responsibility, EM applies a systems engineering approach to identify baseline disposition plans for the wastes and materials (storage, stabilization, treatment, and disposal), assess the path viability, and develop integration opportunities to improve the disposition viability or to combine, eliminate, and/or simplify activities, technologies, and facilities across the DOE Complex, evaluate the baseline and alternatives to make informed decisions, and implement and track selected opportunities. This paper focuses on processes used to assess the disposition path viability - the likelihood that current planning for disposition of nuclear waste and materials can be implemented

  13. Implications of sustainability assessment for electricity system design: The case of the Ontario Power Authority's integrated power system plan

    International Nuclear Information System (INIS)

    Winfield, Mark; Gibson, Robert B.; Markvart, Tanya; Gaudreau, Kyrke; Taylor, Jennifer

    2010-01-01

    This paper explores the results and implications of an illustrative application of a sustainability assessment framework in the design and evaluation of a major integrated power system plan. The paper examines the integrated power system plan developed by the Ontario Power Authority in 2007. The basic framework rests on a generic set of evaluation criteria reflecting basic requirements for progress towards sustainability that was adopted, reinterpreted and applied by the Authority in support of its proposed plan. In response to evident deficiencies in the Authority's work, the authors and colleagues undertook a re-examination using a more fully elaborated sustainability assessment framework, specified for application to power system planning. The results point to a plan and plan components substantially different from those proposed by the Authority. More generally, the results highlight three advantages of applying such a sustainability assessment framework: comprehensive coverage of key requirements for progress towards sustainability while ensuring careful attention to the context and concerns of the sector; emphasis on identifying plan options that avoid major trade-offs among the sustainability criteria and recognition of interactions among the social, ecological, economic and technological realms favouring options that offer multiple, mutually reinforcing and lasting benefits.

  14. REHABILITATION NEEDS AND PLANS AMONG PATIENTS WITH CANCER, ASSESSED AT HOSPITALS AND WHEN REHABILITATION BEGINS

    DEFF Research Database (Denmark)

    Handberg, Charlotte; Maribo, Thomas; Jensen, Charlotte Maria

    and the specifics of needs and plans facilitates targeted rehabilitation interventions. Implications: Systematic needs assessment in cancer rehabilitation unveil the requirement of physical rehabilitation. Supervised physical activity renders an intervention possible tailored the special needs cancer patients have......Background: Systematic assessment of rehabilitation needs is prerequisite for sufficient rehabilitation, but little is known about patients' needs. Purpose: The aim of this study was to describe specific stated rehabilitation needs and plans among patients with cancer at hospitals when diagnosed...... and when municipal rehabilitation begins. Methods: Needs-assessment-forms for rehabilitation from 188 cancer patients from two hospitals and two municipal cancer rehabilitation programmes were analysed. The forms included 1) stated needs: 58 fixed areas categorised in six domains and 2) an area to document...

  15. 78 FR 10606 - Final Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Science.gov (United States)

    2013-02-14

    ... Environmental Assessment for Monitor National Marine Sanctuary: Notice of Public Availability AGENCY: Office of National Marine Sanctuaries (ONMS), National Ocean Service (NOS), National Oceanic and Atmospheric... releasing the final management plan and environmental assessment for Monitor National Marine Sanctuary. DATE...

  16. RCRA Assessment Plan for Single-Shell Tank Waste Management Area S-SX at the Hanford Site

    International Nuclear Information System (INIS)

    Chou, C.J.; Johnson, V.G.

    1999-01-01

    A groundwater quality assessment plan was prepared for waste management area S-SX at the Hanford Site. Groundwater monitoring is conducted at this facility in accordance with Title 40, Code of Federal Regulation (CFR) Part 265, Subpart F [and by reference of Washington Administrative Code (WAC) 173-303-400(3)]. The facility was placed in assessment groundwater monitoring program status after elevated waste constituents and indicator parameter measurements (i.e., chromium, technetium-99 and specific conductance) in downgradient monitoring wells were observed and confirmed. A first determination, as allowed under 40 CFR 265.93(d), provides the owner/operator of a facility an opportunity to demonstrate that the regulated unit is not the source of groundwater contamination. Based on results of the first determination it was concluded that multiple source locations in the waste management area could account for observed spatial and temporal groundwater contamination patterns. Consequently, a continued investigation is required. This plan, developed using the data quality objectives process, is intended to comply with the continued investigation requirement. Accordingly, the primary purpose of the present plan is to determine the rate and extent of dangerous waste (hexavalent chromium and nitrate) and radioactive constituents (e.g., technetium-99) in groundwater and to determine their concentrations in groundwater beneath waste management area S-SX. Comments and concerns expressed by the Washington State Department of Ecology on the initial waste management area S-SX assessment report were addressed in the descriptive narrative of this plan as well as in the planned activities. Comment disposition is documented in a separate addendum to this plan

  17. Planning for Student Assessment: Participant's Handbook. Bilingual Evaluation Technical Assistance, Workshop III.

    Science.gov (United States)

    California Univ., Los Angeles. Center for the Study of Evaluation.

    This participant's handbook is designed to be used in conjunction with a workshop for planning bilingual student assessment. The following materials are included: (1) simulation materials, including descriptions of simulated programs, tests, test manuals, and printouts; (2) checklists, diagrams, and charts illustrating important points of the…

  18. Workshop on IAEA Tools for Nuclear Energy System Assessment for Long-Term Planning and Development

    International Nuclear Information System (INIS)

    2009-01-01

    The purpose of the workshop is to present to Member States tools and methods that are available from the IAEA in support of long-term energy planning and nuclear energy system assessments, both focusing on the sustainable development of nuclear energy. This includes tools devoted to energy system planning, indicators for sustainable energy development, the INPRO methodology for Nuclear Energy System Assessment (NESA) and tools for analysing nuclear fuel cycle material balance. The workshop also intends to obtain feedback from Member States on applying the tools, share experiences and lessons learned, and identify needs for IAEA support

  19. Reliably Assessing the Effectiveness of a Plan Using Models of Varying Fidelity and Under Time Constraints

    NARCIS (Netherlands)

    Jong, S. de; Noordkamp, H.W.; Poel, N.C.L. van der; Smit, S.K.

    2015-01-01

    Assessing the effectiveness of a plan, given multiple potential scenarios, is a common problem for analysts, especially in the military domain. This problem can seriously impact the safety of the people that are involved in planned missions. More precisely, the availability of multiple models, with

  20. Resident career planning needs in internal medicine: a qualitative assessment.

    Science.gov (United States)

    Garcia, Rina L; Windish, Donna M; Rosenbaum, Julie R

    2010-12-01

    Few residency programs have centralized resources for career planning. As a consequence, little is known about residents' informational needs regarding career planning. To examine career preparation stressors, practical needs, and information that residents wished they were privy to when applying. In 2007 and 2008, we surveyed 163 recent graduates or graduating residents from 10 Yale-based and Yale-affiliated hospitals' internal medicine programs regarding their experiences with applying for positions after residency. We included questions about demographics, mentorship, stress of finding a job or fellowship, and open-ended questions to assess barriers and frustrations. Qualitative data were coded independently and a classification scheme was negotiated by consensus. A total of 89 residents or recent graduates responded, and 75% of them found career planning during residency training at least somewhat stressful. Themes regarding the application process included (1) knowledge about the process, (2) knowledge about career paths and opportunities, (3) time factors, (4) importance of adequate personal guidance and mentorship, and (5) self-knowledge regarding priorities and the desired outcome. Residents identified the following advice as most important: (1) start the process as early as possible and with a clear knowledge of the process timeline, (2) be clear about personal goals and priorities, and (3) be well-informed about a prospective employer and what that employer is looking for. Most residents felt career planning should be structured into the curriculum and should occur in the first year or throughout residency. This study highlights residents' desire for structured dissemination of information and counseling with regard to career planning during residency. Our data suggest that exposure to such resources may be beneficial as early as the first year of training.

  1. Should different impact assessment instruments be integrated? Evidence from English spatial planning

    International Nuclear Information System (INIS)

    Tajima, Ryo; Fischer, Thomas B.

    2013-01-01

    This paper aims at providing empirical evidence to the question as to whether integration of different instruments is achieving its aim in supporting sustainable decision making, focusing on SEA inclusive sustainability appraisal (SA) and other impact assessments (IAs) currently used in English spatial planning. Usage of IAs in addition to SA is established and an analysis of the integration approach (in terms of process, output, and assessor) as well as its effectiveness is conducted. It is found that while integration enhances effectiveness to some extent, too much integration, especially in terms of the procedural element, appears to diminish the overall effectiveness of each IA in influencing decisions as they become captured by the balancing function of SA. -- Highlights: ► The usage of different impact assessments in English spatial planning is clarified. ► The relationship between integration approach and effectiveness is analyzed. ► Results suggest that integration does not necessarily lead to more sustainable decisions. ► Careful consideration is recommended upon process integration

  2. Should different impact assessment instruments be integrated? Evidence from English spatial planning

    Energy Technology Data Exchange (ETDEWEB)

    Tajima, Ryo, E-mail: tajima.ryo@nies.go.jp [Interdisciplinary Graduate School of Science and Engineering, Tokyo Institute of Technology, 4259-G5-9 Nagatsuta-cho, Midori-ku, Yokoyama City, Kanagawa, 226-8502 (Japan); Fischer, Thomas B., E-mail: fischer@liverpool.ac.uk [Department of Geography and Planning, School of Environmental Sciences, University of Liverpool, 74 Bedford Street South, Liverpool L69 7ZQ (United Kingdom)

    2013-07-15

    This paper aims at providing empirical evidence to the question as to whether integration of different instruments is achieving its aim in supporting sustainable decision making, focusing on SEA inclusive sustainability appraisal (SA) and other impact assessments (IAs) currently used in English spatial planning. Usage of IAs in addition to SA is established and an analysis of the integration approach (in terms of process, output, and assessor) as well as its effectiveness is conducted. It is found that while integration enhances effectiveness to some extent, too much integration, especially in terms of the procedural element, appears to diminish the overall effectiveness of each IA in influencing decisions as they become captured by the balancing function of SA. -- Highlights: ► The usage of different impact assessments in English spatial planning is clarified. ► The relationship between integration approach and effectiveness is analyzed. ► Results suggest that integration does not necessarily lead to more sustainable decisions. ► Careful consideration is recommended upon process integration.

  3. Key skills by design: adapting a central Web resource to departmental contexts

    Directory of Open Access Journals (Sweden)

    Claire McAvinia

    2002-12-01

    Full Text Available Web-based delivery of support materials for students has proved to be a popular way of helping small teams to implement key skills policies within universities. The development of 'key' or 'transferable' skills is now encouraged throughout education, but resources (both in terms of staffing and budget tend to be limited. It is difficult for key skills teams to see learners face to face, and not feasible to print or distribute large amounts of paper-based material. Web-based delivery presents a means of overcoming these problems but it can result in generic study skills material simply being published online without due consideration of the needs of different groups of learners within different subject disciplines. Therefore, although a centralized Website for skills provision can overcome logistical problems, it may be perceived as irrelevant or unusable by the student population. This paper presents a model for Web-based delivery of support for key skills which incorporates two separate approaches to the design of these resources. The model was implemented as part of a wider key skills pilot project at University College London, over a period of one year. It includes a 'core' Website, containing information and resources for staff and students. These can also be accessed via customized, departmental key skills homepages. This paper presents the basis for the design choices made in preparing these materials, and the evaluation of some of the pilot departments using them. It then draws some wider conclusions about the effectiveness of this design for supporting skills development.

  4. THE UNCERTAINTIES ON THE GIS BASED LAND SUITABILITY ASSESSMENT FOR URBAN AND RURAL PLANNING

    Directory of Open Access Journals (Sweden)

    H. Liu

    2017-09-01

    Full Text Available The majority of the research on the uncertainties of spatial data and spatial analysis focuses on some specific data feature or analysis tool. Few have accomplished the uncertainties of the whole process of an application like planning, making the research of uncertainties detached from practical applications. The paper discusses the uncertainties of the geographical information systems (GIS based land suitability assessment in planning on the basis of literature review. The uncertainties considered range from index system establishment to the classification of the final result. Methods to reduce the uncertainties arise from the discretization of continuous raster data and the index weight determination are summarized. The paper analyzes the merits and demerits of the “Nature Breaks” method which is broadly used by planners. It also explores the other factors which impact the accuracy of the final classification like the selection of class numbers, intervals and the autocorrelation of the spatial data. In the conclusion part, the paper indicates that the adoption of machine learning methods should be modified to integrate the complexity of land suitability assessment. The work contributes to the application of spatial data and spatial analysis uncertainty research on land suitability assessment, and promotes the scientific level of the later planning and decision-making.

  5. Use of risk assessment panels during revision of the Tongass Land and Resource Management Plan.

    Science.gov (United States)

    Charles G. Shaw

    1999-01-01

    This paper describes the process used to conduct the 16 risk assessment panels and a subsistence working group held during revision of the Tongass land management plan. It provides an overview of how results from the panels were used by forest managers in plan-related decisionmaking, discusses some reactions to the effort, and identifies some opportunities to improve...

  6. Building Strong Geoscience Departments Through the Visiting Workshop Program

    Science.gov (United States)

    Ormand, C. J.; Manduca, C. A.; Macdonald, H.; Bralower, T. J.; Clemens-Knott, D.; Doser, D. I.; Feiss, P. G.; Rhodes, D. D.; Richardson, R. M.; Savina, M. E.

    2011-12-01

    The Building Strong Geoscience Departments project focuses on helping geoscience departments adapt and prosper in a changing and challenging environment. From 2005-2009, the project offered workshop programs on topics such as student recruitment, program assessment, preparing students for the workforce, and strengthening geoscience programs. Participants shared their departments' challenges and successes. Building on best practices and most promising strategies from these workshops and on workshop leaders' experiences, from 2009-2011 the project ran a visiting workshop program, bringing workshops to 18 individual departments. Two major strengths of the visiting workshop format are that it engages the entire department in the program, fostering a sense of shared ownership and vision, and that it focuses on each department's unique situation. Departments applied to have a visiting workshop, and the process was highly competitive. Selected departments chose from a list of topics developed through the prior workshops: curriculum and program design, program elements beyond the curriculum, recruiting students, preparing students for the workforce, and program assessment. Two of our workshop leaders worked with each department to customize and deliver the 1-2 day programs on campus. Each workshop incorporated exercises to facilitate active departmental discussions, presentations incorporating concrete examples drawn from the leaders' experience and from the collective experiences of the geoscience community, and action planning to scaffold implementation. All workshops also incorporated information on building departmental consensus and assessing departmental efforts. The Building Strong Geoscience Departments website complements the workshops with extensive examples from the geoscience community. Of the 201 participants in the visiting workshop program, 140 completed an end of workshop evaluation survey with an overall satisfaction rating of 8.8 out of a possible 10

  7. Multicriteria plan optimization in the hands of physicians: a pilot study in prostate cancer and brain tumors.

    Science.gov (United States)

    Müller, Birgit S; Shih, Helen A; Efstathiou, Jason A; Bortfeld, Thomas; Craft, David

    2017-11-06

    ' navigated plan qualities were comparable to the clinical plans. Given the reduction of planning time of the planner and the equal or lower planning time of physicians, this approach has the potential to improve departmental efficiencies.

  8. Quality-of-life assessment of family planning adopters through user perspectives in the district of Karimnagar

    Directory of Open Access Journals (Sweden)

    Kameswararao Avasarala

    2009-01-01

    Full Text Available Background: Small families adopting family planning are usually considered happy families. They are expected to lead a better qualitative life. Quality-of-life (QOL is routinely assessed for knowing patients′ health status. Recently, the QOL concept has become increasingly popular for evaluating the impact of public health interventions. Hitherto, QOL is usually assessed by means of program achievements or indicators, which may sometimes be misleading. Hence, the new culture of QOL assessment by means of user perspectives is now becoming popular. Research Questions: 1 Is the quality-of-life of family planning (FP adopters better than that of non-FP adopters? 2 Are the user perspectives helpful in QOL assessment? Materials and Methods: A cross-sectional descriptive study was carried out among 50 FP adopting families and 50 non-FP adopting families from the village of Vutoor and the city of Karimnagar in Andhra Pradesh. Sampling Methods: Random sampling, Proportions and Chi square test. Results: Program perspectives revealed a better standard of living for FP adopters because they have amenities like housing, television, and vehicles and less mortality and morbidity ( P < 0.001. However, they lack positive feelings towards life, general adaptation, personal relationships, and leisure opportunities. Finally, self-assessment by FP adopters themselves revealed no significant increase in their qualitative life after family planning ( P = 0.05. Conclusions: While assessing the impact of a health program on quality-of-life, multiple methods of assessments including user perspectives are better than program indicators alone.

  9. Conservation physiology can inform threat assessment and recovery planning processes for threatened species

    DEFF Research Database (Denmark)

    Birnie-Gauvin, Kim; Walton, Sarah; Delle Palme, Caleigh A.

    2017-01-01

    threat assessments and work with partners to develop recovery plans. Here we argue that conservation physiology has much to offer for the threat assessment process and outline the ways in which this can be operationalized. For instance, conservation physiology is effective at revealing causal...... role in the conservation activities of bodies like the IUCN that are engaged in threat assessment and recovery of endangered organisms. Although we focus on activities at the international scale, these same concepts are relevant and applicable to national and regional bodies...

  10. Climate change adaptation impact cost assessment in France. Second phase report. September 2009

    International Nuclear Information System (INIS)

    2009-01-01

    Firstly, this report presents the context and challenges of works dealing with climate change adaptation assessment: observations and perspectives of climate change, concepts and definitions of adaptation to climate change, adaptation within national, European and international context, objectives and organisation of the France's inter-departmental Group. It describes the chosen methodology: hypothesis, methodological tools (climate model), bibliographical tool, and heat wave counting methodology. It discusses the present results, outlines the encountered difficulties and discusses the perspectives for future work

  11. Planning Hybrid Intensity Modulated Radiation Therapy for Whole-breast Irradiation

    Energy Technology Data Exchange (ETDEWEB)

    Farace, Paolo [Medical Physics Department, Regional Oncological Hospital, Cagliari (Italy); Zucca, Sergio; Solla, Ignazio; Fadda, Giuseppina; Durzu, Silvia; Porru, Sergio; Meleddu, Gianfranco [Medical Physics Department, Regional Oncological Hospital, Cagliari (Italy); Deidda, Maria Assunta; Possanzini, Marco; Orru, Sivia; Lay, Giancarlo [Radiotherapy Department, Regional Oncological Hospital, Cagliari (Italy)

    2012-09-01

    Purpose: To test tangential and not-tangential hybrid intensity modulated radiation therapy (IMRT) for whole-breast irradiation. Methods and Materials: Seventy-eight (36 right-, 42 left-) breast patients were randomly selected. Hybrid IMRT was performed by direct aperture optimization. A semiautomated method for planning hybrid IMRT was implemented using Pinnacle scripts. A plan optimization volume (POV), defined as the portion of the planning target volume covered by the open beams, was used as the target objective during inverse planning. Treatment goals were to prescribe a minimum dose of 47.5 Gy to greater than 90% of the POV and to minimize the POV and/or normal tissue receiving a dose greater than 107%. When treatment goals were not achieved by using a 4-field technique (2 conventional open plus 2 IMRT tangents), a 6-field technique was applied, adding 2 non tangential (anterior-oblique) IMRT beams. Results: Using scripts, manual procedures were minimized (choice of optimal beam angle, setting monitor units for open tangentials, and POV definition). Treatment goals were achieved by using the 4-field technique in 61 of 78 (78%) patients. The 6-field technique was applied in the remaining 17 of 78 (22%) patients, allowing for significantly better achievement of goals, at the expense of an increase of low-dose ({approx}5 Gy) distribution in the contralateral tissue, heart, and lungs but with no significant increase of higher doses ({approx}20 Gy) in heart and lungs. The mean monitor unit contribution to IMRT beams was significantly greater (18.7% vs 9.9%) in the group of patients who required 6-field procedure. Conclusions: Because hybrid IMRT can be performed semiautomatically, it can be planned for a large number of patients with little impact on human or departmental resources, promoting it as the standard practice for whole-breast irradiation.

  12. Planning hybrid intensity modulated radiation therapy for whole-breast irradiation.

    Science.gov (United States)

    Farace, Paolo; Zucca, Sergio; Solla, Ignazio; Fadda, Giuseppina; Durzu, Silvia; Porru, Sergio; Meleddu, Gianfranco; Deidda, Maria Assunta; Possanzini, Marco; Orrù, Sivia; Lay, Giancarlo

    2012-09-01

    To test tangential and not-tangential hybrid intensity modulated radiation therapy (IMRT) for whole-breast irradiation. Seventy-eight (36 right-, 42 left-) breast patients were randomly selected. Hybrid IMRT was performed by direct aperture optimization. A semiautomated method for planning hybrid IMRT was implemented using Pinnacle scripts. A plan optimization volume (POV), defined as the portion of the planning target volume covered by the open beams, was used as the target objective during inverse planning. Treatment goals were to prescribe a minimum dose of 47.5 Gy to greater than 90% of the POV and to minimize the POV and/or normal tissue receiving a dose greater than 107%. When treatment goals were not achieved by using a 4-field technique (2 conventional open plus 2 IMRT tangents), a 6-field technique was applied, adding 2 non tangential (anterior-oblique) IMRT beams. Using scripts, manual procedures were minimized (choice of optimal beam angle, setting monitor units for open tangentials, and POV definition). Treatment goals were achieved by using the 4-field technique in 61 of 78 (78%) patients. The 6-field technique was applied in the remaining 17 of 78 (22%) patients, allowing for significantly better achievement of goals, at the expense of an increase of low-dose (∼5 Gy) distribution in the contralateral tissue, heart, and lungs but with no significant increase of higher doses (∼20 Gy) in heart and lungs. The mean monitor unit contribution to IMRT beams was significantly greater (18.7% vs 9.9%) in the group of patients who required 6-field procedure. Because hybrid IMRT can be performed semiautomatically, it can be planned for a large number of patients with little impact on human or departmental resources, promoting it as the standard practice for whole-breast irradiation. Copyright © 2012 Elsevier Inc. All rights reserved.

  13. Planning Hybrid Intensity Modulated Radiation Therapy for Whole-breast Irradiation

    International Nuclear Information System (INIS)

    Farace, Paolo; Zucca, Sergio; Solla, Ignazio; Fadda, Giuseppina; Durzu, Silvia; Porru, Sergio; Meleddu, Gianfranco; Deidda, Maria Assunta; Possanzini, Marco; Orrù, Sivia; Lay, Giancarlo

    2012-01-01

    Purpose: To test tangential and not-tangential hybrid intensity modulated radiation therapy (IMRT) for whole-breast irradiation. Methods and Materials: Seventy-eight (36 right-, 42 left-) breast patients were randomly selected. Hybrid IMRT was performed by direct aperture optimization. A semiautomated method for planning hybrid IMRT was implemented using Pinnacle scripts. A plan optimization volume (POV), defined as the portion of the planning target volume covered by the open beams, was used as the target objective during inverse planning. Treatment goals were to prescribe a minimum dose of 47.5 Gy to greater than 90% of the POV and to minimize the POV and/or normal tissue receiving a dose greater than 107%. When treatment goals were not achieved by using a 4-field technique (2 conventional open plus 2 IMRT tangents), a 6-field technique was applied, adding 2 non tangential (anterior-oblique) IMRT beams. Results: Using scripts, manual procedures were minimized (choice of optimal beam angle, setting monitor units for open tangentials, and POV definition). Treatment goals were achieved by using the 4-field technique in 61 of 78 (78%) patients. The 6-field technique was applied in the remaining 17 of 78 (22%) patients, allowing for significantly better achievement of goals, at the expense of an increase of low-dose (∼5 Gy) distribution in the contralateral tissue, heart, and lungs but with no significant increase of higher doses (∼20 Gy) in heart and lungs. The mean monitor unit contribution to IMRT beams was significantly greater (18.7% vs 9.9%) in the group of patients who required 6-field procedure. Conclusions: Because hybrid IMRT can be performed semiautomatically, it can be planned for a large number of patients with little impact on human or departmental resources, promoting it as the standard practice for whole-breast irradiation.

  14. Social impact assessment and management methodology using social indicators and planning strategies

    International Nuclear Information System (INIS)

    Olsen, M.E.; Curry, M.G.; Greene, M.R.; Melber, B.D.; Merwin, D.J.

    1978-08-01

    The scope of environmental impact statements prepared during the past few years has steadily expanded to incorporate all aspects of the social as well as the natural environment, including demographic, economic, social, political, and cultural conditions. Broadly conceived, social impacts are alterations in people's living conditions that occur in conjunction with a new policy, program, or project, and that (1) are in addition to all other concurrent changes produced by other factors, and (2) are seen by those affected as significant social events. Since any social environment is constantly changing, the crucial problems in analyzing social impacts are to identify those social alterations that are a direct or indirect result of the specific action under examination, apart from all other events and changes, and to determine which of these alterations are having significant social effects on the people involved. Three features of this conception of social impacts are especially noteworthy. First, although impacts are often thought of as undesirable or detrimental in nature, they may also be desirable or beneficial. Second, although impacts are often described as caused by prior intervening innovations, in reality they always interact with their original causes in a reciprocal process, either immediately or after some time lag. Third, the purpose of social impact assessment is to enable policy makers to anticipate and plan for potential impacts before they occur, and then act to prevent or mitigate undesired impacts. A new methodology for performing social impact assessment and management studies that meet current needs by emphasizing standardized social indicators and social planning techniques is proposed. We refer to our approach as the Social Impact and Planning (SIP) method of social impact assessment

  15. Assessing Flood Risks and Planning for Resiliency in New Jersey: A Case Study on the Use of Online Flood Mapping and Resilience Planning Tools

    Science.gov (United States)

    Auermuller, L. M.; Gatto, J.; Huch, C.

    2015-12-01

    The highly developed nature of New Jersey's coastline, barrier island and lagoon communities make them particularly vulnerable to storm surge, sea level rise and flooding. The impacts of Hurricane Sandy have enlightened coastal communities to these realities. Recognizing these vulnerabilities, the Jacques Cousteau National Research Reserve (JC NERR), Rutgers Center for Remote Sensing and Spatial Analysis (CRSSA), Rutgers Bloustein School and the Barnegat Bay Partnership (BBP) have developed web-based tools to assist NJ's coastal communities in visualizing and planning for future local impacts. NJFloodMapper and NJAdapt are two complementary interactive mapping websites that visualize different current and future flood hazards. These hazard layers can be combined with additional data including critical facilities, evacuation routes, socioeconomic and environmental data. Getting to Resilience is an online self-assessment tool developed to assist communities reduce vulnerability and increase preparedness by linking planning, mitigation, and adaptation. Through this interactive process communities will learn how their preparedness can yield valuable points through voluntary programs like FEMA's Community Rating System and Sustainable Jersey. The assessment process can also increase the community's understanding of where future vulnerabilities should be addressed through hazard mitigation planning. Since Superstorm Sandy, more than thirty communities in New Jersey have been provided technical assistance in assessing their risks and vulnerabilities to coastal hazards, and have begun to understand how to better plan and prepare for short and long-term changes along their shorelines.

  16. Integration of strategic environmental assessment in spatial planning

    DEFF Research Database (Denmark)

    Kørnøv, Lone

    The paper explores the similarities between the content of the EU directive, SEA practice and the existing spatial planning in Denmark, and how SEA can be integrated into plan making and plan implementation.......The paper explores the similarities between the content of the EU directive, SEA practice and the existing spatial planning in Denmark, and how SEA can be integrated into plan making and plan implementation....

  17. An assessment of the number of CT slices necessary to plan breast radiotherapy

    International Nuclear Information System (INIS)

    Vincent, D.; Beckham, W.; Delaney, G.

    1999-01-01

    The aim of this study was to evaluate the number of CT slices required to produce satisfactory dose distribution for tangential field irradiation of the chest wall and breast and to assess correlation of this with the volume of breast tissue treated. We conclude that a single-slice plan is unsatisfactory in providing sufficient information about the dose variation across the treatment volume and that ideally a 3D plan with DVHs should be produced. If the required data is unavailable then a minimum of three slices should be used as an approximation. We also propose a software tool for treatment planning systems, which calculates the percentage of the total PTV having dose outside the ICRU 50 radiation dose distribution homogeneity guideline range

  18. Environmental Assessment for the General Plan and Maintenance of Patrick Air Force Base, Florida

    Science.gov (United States)

    2005-05-01

    considered viable. P A F B G e n e r a l P l a n E A 2 Environmental Effects The General Plan EA evaluated the environmental impacts of...year cycle. The potential environmental effects were assessed for the following environmental resource areas: air quality, water quality, geology...ADP Area Development Plan AF Air Force AFB Air Force Base AFETR Air Force Eastern Test Range AFI Air Force Instruction AFMAN Air Force Manual

  19. Assessment of the Dutch National Air Quality Plan 2004; Beoordeling van het Nationaal Luchtkwaliteitsplan 2004

    Energy Technology Data Exchange (ETDEWEB)

    Beck, J.P.; Buringh, E.; Wieringa, K.

    2005-02-01

    The Dutch government expects that targets for the reduction of emission of particulates and nitrogen dioxide can not be reached in time. Therefore, the Netherlands is obliged to draft a plan of actions in order to realize those targets within the period that has been agreed upon in the context of the European Union air quality policy. The present plan of action has been assessed by the Netherlands Environmental Assessment Agency (MNP) with regard to the feasibility of the boundary values and the preconditions for action plans as formulated by the European Committee. Also, the plan has been assessed for the prevention or limitation of health effects and the Dutch position with regard to particulates. [Dutch] Het luchtbeleid heeft als doelstelling dat op lange termijn de gezondheidsrisico's en de effecten op ecosystemen en biodiversiteit moeten dalen tot een verwaarloosbaar niveau. Daartoe zijn in Europees verband normen voor de luchtkwaliteit vastgesteld. Nederland verwacht dat met het vastgestelde beleid niet tijdig aan de grenswaarden voor fijn stof en stikstofdioxide zal worden voldaan. Hierdoor is Nederland verplicht om een actieplan op te stellen. De uitvoering ervan zal er toe moeten leiden dat Nederland alsnog de doelen binnen de gestelde termijn haalt. Het Milieu- en Natuurplanbureau (MNP) van het RIVM heeft het actieplan getoetst aan de haalbaarheid van grenswaarden en aan de voorwaarden die door de Europese Commissie voor actieplannen zijn opgesteld. Daarnaast is het plan beoordeeld in het perspectief van de doelstelling van de richtlijn: het voorkomen of verminderen van gezondheidseffecten. Tenslotte geeft de evaluatie aanknopingspunten voor het herijken van de Nederlandse positie in de fijnstofproblematiek.

  20. Joining up health and planning: how Joint Strategic Needs Assessment (JSNA) can inform health and wellbeing strategies and spatial planning.

    Science.gov (United States)

    Tomlinson, Paul; Hewitt, Stephen; Blackshaw, Neil

    2013-09-01

    There has been a welcome joining up of the rhetoric around health, the environment and land use or spatial planning in both the English public health white paper and the National Planning Policy Framework. However, this paper highlights a real concern that this is not being followed through into practical guidance needed by local authorities (LAs), health bodies and developers about how to deliver this at the local level. The role of Joint Strategic Needs Assessments (JSNAs) and Health and Wellbeing Strategies (HWSs) have the potential to provide a strong basis for integrated local policies for health improvement, to address the wider determinants of health and to reduce inequities. However, the draft JSNA guidance from the Department of Health falls short of providing a robust, comprehensive and practical guide to meeting these very significant challenges. The paper identifies some examples of good practice. It recommends that action should be taken to raise the standards of all JSNAs to meet the new challenges and that HWSs should be aligned spatially and temporally with local plans and other LA strategies. HWSs should also identify spatially targeted interventions that can be delivered through spatial planning or transport planning. Steps need to be taken to ensure that district councils are brought into the process.

  1. Functional Behavior Assessments and Behavior Intervention Plans: Legal Requirements and Professional Recommendations

    Science.gov (United States)

    Collins, Lauren W.; Zirkel, Perry A.

    2017-01-01

    Functional behavior assessments (FBAs) and behavior intervention plans (BIPs) are critical components in the education of students with, or at risk for, emotional disturbance (ED). The purpose of this article is to compare the legal requirements with the professional requirements for FBAs and BIPs. The comparison is first according to the…

  2. Assessing family planning service-delivery skills in Kenya.

    Science.gov (United States)

    Valadez, J J; Transgrud, R; Mbugua, M; Smith, T

    1997-06-01

    This report demonstrates the use of Lot Quality Assurance Sampling (LQAS) to evaluate the technical competence of two cohorts of family planning service providers in Kenya trained with a new curriculum. One cohort had just finished training within two months of the study. The other cohort was the first group trained with the new curriculum about one year before the study. LQAS was adapted from industrial and other public health applications to assess both the individual competence of 30 service providers and the competence of each cohort. Results show that Cohorts One and Two did not differ markedly in the number of tasks needing improvement. However, both cohorts exhibited more tasks needing improvement in counseling skills as compared with physical examination skills or with all other skills. Care-givers who were not currently providing services accounted for most service-delivery problems. This result suggests that providers' use of their skills explains their ability to retain service-delivery skills learned in training to a greater degree than does the amount of time elapsed since they were trained. LQAS proved to be a rapid, easy-to-use empirical method for management decisionmaking for improvement of a family planning training curriculum and services.

  3. Albeni Falls Wildlife Management Plan - preliminary environmental assessment

    International Nuclear Information System (INIS)

    1996-04-01

    Bonneville Power Administration (BPA) proposes to fund the development and implementation of the Albeni Falls Wildlife Management Plan. Approved by the Northwest Power Planning Council (Council) in 1990, the project is a cooperative effort with the Interagency Work Group that includes the Idaho Department of Fish and Game (IDFG); United States Fish and Wildlife Service (USFWS); United States Forest Service (USFS); United States Army Corps of Engineers (COE); the Kalispel Tribe; and the Upper Columbia United Tribes (UCUT). The proposed action would enable the Interagency Work Group to protect and enhance a variety of wetland and riparian habitats, restore 28,587 habitat units lost as a result of the construction and operation of Albeni Falls Dam, and implement long-term wildlife management activities at selected sites within the overall study area. This Environmental Assessment (EA) examines the potential environmental effects of protecting and enhancing wildlife habitat in selected portions of a 225,077 hectare (556,160 acre) study area surrounding Lake Pend Oreille in Bonner County, and 7,770 hectare (19,200 acre) area surrounding Spirit and Twin lakes, in Kootenai County, Idaho. Four proposed activities are analyzed: habitat protection; habitat enhancement; operation and maintenance (O ampersand M); and monitoring and evaluation (M ampersand E)

  4. Assessment of environmental measures in the Dutch Tax Plan 2008

    International Nuclear Information System (INIS)

    2007-09-01

    The environmental measures that were included in the Dutch Tax plan 2008 have been evaluated for their CO2 effects. In addition, the effects on NOx and PM10 emissions have been quantified. They are the following measures: (1) Environmental differentiation of cars Clean and efficient; (2) Adjustment of addition for private use of company cars; (3) Additional financial burden environment unfriendly fuels/energy; (4) Introduction of air passenger tax (350 million euro) (5) Shift from BPM1 to MRB2; (6) Balancing energy tax for sustainably generated electricity for small consumers; (7) Introduction of packaging tax; (8) Adjustment of the tariff of waste for shredder. The effects of measures 2,7 and 8 have not been assessed by MNP (Netherlands Environmental Assessment Agency). [mk] [nl

  5. Comprehensive Care Plan Development Using Resident Assessment Instrument Framework: Past, Present, and Future Practices

    Directory of Open Access Journals (Sweden)

    Mary Ellen Dellefield

    2015-10-01

    Full Text Available Development of the comprehensive care plan (CCP is a requirement for nursing homes participating in the federal Medicare and Medicaid programs, referred to as skilled nursing facilities. The plan must be developed within the context of the comprehensive interdisciplinary assessment framework—the Resident Assessment Instrument (RAI. Consistent compliance with this requirement has been difficult to achieve. To improve the quality of CCP development within this framework, an increased understanding of complex factors contributing to inconsistent compliance is required. In this commentary, we examine the history of the comprehensive care plan; its development within the RAI framework; linkages between the RAI and registered nurse staffing; empirical evidence of the CCP’s efficacy; and the limitations of extant standards of practices in CCP development. Because of the registered nurse’s educational preparation, professional practice standards, and licensure obligations, the essential contributions of professional nurses in CCP development are emphasized. Recommendations for evidence-based micro and macro level practice changes with the potential to improve the quality of CCP development and regulatory compliance are presented. Suggestions for future research are given.

  6. An inexact multi-objective programming approach for strategic environmental assessment on regional development plan

    Institute of Scientific and Technical Information of China (English)

    WANG Jihua; GUO Huaicheng; LIU Lei; HAO Mingjia; ZHANG Ming; LU Xiaojian; XING Kexia

    2004-01-01

    This paper presents the development of an inexact multi-objective programming (IMOP) model and its application to the strategic environmental assessment (SEA) for the regional development plan for the Hunnan New Zone (HNZ) in Shenyang City, China. Inexact programming and multi-objective programming methods are employed to effectively account for extensive uncertainties in the study system and to reflect various interests from different stakeholders, respectively. In the case study, balancing-economy-and-environment scenario and focusing-industry-development scenario are analyzed by the interactive solution process for addressing the preferences from local authorities and compromises among different objectives. Through interpreting the model solutions under both scenarios, analysis of industrial structure, waste water treatment plant(WWTP) expansion, water consumption and pollution generation and treatment are undertaken for providing a solid base to justify and evaluate the HNZ regional development plan. The study results show that the developed IMOP-SEA framework is feasible and applicable in carrying comprehensive environmental impact assessments for development plan in a more effective and efficient manner.

  7. 76 FR 23755 - Release of Draft Risk and Exposure Assessments and Final Integrated Review Plan for the National...

    Science.gov (United States)

    2011-04-28

    ... titled, ``Ozone National Ambient Air Quality Standards: Scope and Methods Plan for Health Risk and... Standards: Scope and Methods Plan for Welfare Risk and Exposure Assessment'' (REA Plan for the secondary... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Parts 50 and 58 [EPA-HQ-OAR-2008-0699; FRL-9300-4] RIN 2060...

  8. Strategic environmental assessment for local transport plans; Strategische Umweltpruefung in der kommunalen Verkehrsentwicklung

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, Vera

    2008-08-15

    The strategic environmental assessment (SEA) makes new demands for plans and programs also in the transport sector. Particularly on local level transport is one of the biggest causers of negative environmental effects. But there exists no SEA obligation for local transport plans, however many factors suggest to make such an examination in this sector. At the latest in the urban land use planning transport effects are a component for the SEA. Synergies can be exhausted and the individual planning steps are appropriately co-ordinated by the meaningful integration of transport and urban development planning. Additional synergies can gained in connection with further local and/or regional planning like e.g. the clean air planning or noise reduction planning. The aim of the doctoral thesis is to draft recommendations how to integrate the SEA into local transport planning process. For that purpose it is necessary to deduce the requirements demanded by the SEA and to demonstrate the current state of the local transport planning. The doctoral thesis is based on partial results of the research project FE 73.0237 ''Strategische Umweltpruefung in der kommunalen Verkehrsentwicklungsplanung'' in behalf of the German Ministry of Transport (Bundesministerium fuer Verkehr, Bauen und Stadtentwicklung) and mentored by the Federal Office of civil engineering (Bundesamt fuer Bauwesen und Raumordnung). The author of this thesis was instrumental in acquiring those results. The thesis contains a detailed literature research. The SEA's requirements are also described as well as the current state of the local transport planning. The state of the SEA on the different planning levels in the German transport sector is presented. Another part is a survey of 13 municipalities concerning their previous practice of the local transport and environmental planning as well as their experience with the SEA on local level and the analyse of local data. Furthermore three

  9. Assessment of LANL waste management site plan

    International Nuclear Information System (INIS)

    Black, R.L.; Davis, K.D.; Hoevemeyer, S.S.; Jennrich, E.A.; Lund, D.M.

    1991-04-01

    The objective of this report is to present findings from evaluating the Los Alamos National Laboratory (LANL) Waste Management Plan to determine if it meets applicable DOE requirements. DOE Order 5820.2A, Radioactive Waste Management, sets forth requirements and guidelines for the establishment of a Waste Management Plan. The primary purpose of a Waste Management Plan is to describe how waste operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming year

  10. Institutionalizing policy-level health impact assessment in Europe: is coupling health impact assessment with strategic environmental assessment the next step forward?

    Science.gov (United States)

    Wright, John; Parry, Jayne; Scully, Edward

    2005-06-01

    European Union (EU) Member States are interested in using health impact assessment (HIA) as a means of safeguarding their obligations to protect human health under the 1997 Treaty of Amsterdam. However, several have encountered difficulties institutionalizing HIA with the policy-making process. As a consequence, the World Health Organization (WHO) Regional Office for Europe has suggested coupling HIA with strategic environmental assessment (SEA). Traditionally, the incorporation of HIA into other forms of impact assessment has been resisted, for fear of losing its focus on health issues to environmental concerns, and compromising its social model of health with the introduction of biophysical indicators. But can these fears be substantiated? In this paper, we investigate the grounds for such concerns by reviewing the relevant policy documents and departmental guidelines of four non-European countries that have considered the use of integrated assessment. We found that the case for associating HIA with SEA in Europe is strong, and offers potential solutions to problems of screening, theoretical framework, causal pathways and ready entry to the policy process. Coupling HIA with SEA may thus be the next step forward in a longer journey towards institutionalizing HIA as an independent policy-linked device.

  11. A GIS-based tool for an integrated assessment of spatial planning trade-offs with aquaculture.

    Science.gov (United States)

    Gimpel, Antje; Stelzenmüller, Vanessa; Töpsch, Sandra; Galparsoro, Ibon; Gubbins, Matthew; Miller, David; Murillas, Arantza; Murray, Alexander G; Pınarbaşı, Kemal; Roca, Guillem; Watret, Robert

    2018-06-15

    The increasing demand for protein from aquaculture will trigger a global expansion of the sector in coastal and offshore waters. While contributing to food security, potential conflicts with other traditional activities such as fisheries or tourism are inevitable, thus calling for decision-support tools to assess aquaculture planning scenarios in a multi-use context. Here we introduce the AquaSpace tool, one of the first Geographic Information System (GIS)-based planning tools empowering an integrated assessment and mapping of 30 indicators reflecting economic, environmental, inter-sectorial and socio-cultural risks and opportunities for proposed aquaculture systems in a marine environment. A bottom-up process consulting more than 350 stakeholders from 10 countries across southern and northern Europe enabled the direct consideration of stakeholder needs when developing the GIS AddIn. The AquaSpace tool is an open source product and builds in the prospective use of open source datasets at a European scale, hence aiming to improve reproducibility and collaboration in aquaculture science and research. Tool outputs comprise detailed reports and graphics allowing key stakeholders such as planners or licensing authorities to evaluate and communicate alternative planning scenarios and to take more informed decisions. With the help of the German North Sea case study we demonstrate here the tool application at multiple spatial scales with different aquaculture systems and under a range of space-related development constraints. The computation of these aquaculture planning scenarios and the assessment of their trade-offs showed that it is entirely possible to identify aquaculture sites, that correspondent to multifarious potential challenges, for instance by a low conflict potential, a low risk of disease spread, a comparable high economic profit and a low impact on touristic attractions. We believe that a transparent visualisation of risks and opportunities of aquaculture

  12. Heritage Speeches that Guide the Management of Cultural Heritage in the Development Plans of the Department of Santander in Colombia (2008-15

    Directory of Open Access Journals (Sweden)

    Mónica J. Giedelmann Reyes

    2013-07-01

    Full Text Available This article identifies some of the main categories on cultural heritage included in the Santander departmental development plans (2008-11 and 2012-15, in order to characterize it according to diverse forms of conceptualization, management and bonds with other aspects. The grounded theory is the methodology used and from its analysis two closely linked concepts of cultural heritage were identified: culture and tourism. The research results show future risks and opportunities in the region. They emphasize that heritage is seen as the commemoration of the "santandereanidad" or department belonging feeling, tourism and regional development motor, which often emphasizes the financial potential of heritage and ignores the social and anthropological side that this encompasses.

  13. STRATEGIC ENVIRONMENT ASSESSMENT ON LAND-USE PLANNING-A Case Study of Changchun Economic and Technological Zone

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    The study centers on the necessity, the workflow and the synthetically integrated methods (Principal Component Analysis(PCA), AndyticalHierarchyProcess(AHP) andFuzzy ComprerhensiveEvaluation(FCE)) of strategic environment assessment (SEA) on land-use planning. The whole article includes three main parts: firstly, some attributedatabase, graphic-base and the spatial transform matrix, which reflect the change of regional land-use pattern, can be obtained by GIS technique; secondly, adopting fitting method of trend-surface analysis will convert environment monitoringdata from scattered spots to regular control spots, based on which we can perform regional environment impact assessment; finally, Changchun Economic and Technological Developmen Zone is chosen as a case study on land-use planning.Through those efforts the results may be obtained as follows: 1 ) according to transform matrix, the possibility of transformation from one land-use to another can be obtained after the planning is carried out; 2) environment quality would changeas a result of the change of land-nsc pattern; 3) the SEA on land-use plan is an effective tool to make land-use patternmore reasonable.

  14. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment. Volume 1, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  15. Using principles of justice to assess the modal equity of regional transportation plans

    NARCIS (Netherlands)

    Golub, A.; Martens, C.J.C.M.

    2014-01-01

    While equity has been an important consideration for transportation planning agencies in the U.S. following the passage of Civil Rights Act of 1964 (Title VI specifically) and the subsequent Department of Transportation directives, there is little guidance on how to assess the distribution of

  16. An annual employee education calendar as the capstone of educational assessment, planning, and delivery.

    Science.gov (United States)

    Morton, Paula G

    2005-01-01

    Staff development educators can better control their workload and provide a more comprehensive employee education program when the organization adopts a formal five-step process that culminates in the publication of an annual employee education calendar. This article describes the five steps of organization-wide learning needs assessment, resource allocation, priority setting, documentation of the educational plan, and calendar development, including elements and timelines. The annual calendar reflects involvement of staff throughout the facility in the identification, planning, and delivery of education programs. Its publication enhances staff and supervisors' awareness of learning opportunities. Its longer-range perspective assists managers and employees to better plan to meet learning needs and improves participation in staff development activities.

  17. Integrating environment into land-use planning through strategic environmental assessment in China: Towards legal frameworks and operational procedures

    International Nuclear Information System (INIS)

    Tao Tang; Tan Zhu; He Xu

    2007-01-01

    China currently put forwards 'striving to build an environmentally friendly society' as one of the most important development goals. The land administration authorities are facing the challenge of effectively incorporating environment considerations into their planning system. This paper aims to investigate why and how Strategic Environmental Assessment (SEA) is enacted as an effective tool to integrate the environment into land-use planning during the construction process of an environmentally friendly society in China, and identify factors that influence the integration. It presents characteristics of the land-use planning system, and reviews the progress and current state of SEA in China. Results show that SEA provides many benefits in promoting environmental considerations into the land-use planning process. The legal frameworks and operational procedures, in the context of land-use master planning SEA, are summarized and an assessment made of their effectiveness. Some barriers are highlighted through examination of the latest case studies, and several recommendations are presented to overcome these obstacles

  18. Institutional Design for Strategic Environmental Assessment on Urban Economic and Social Development Planning in China

    International Nuclear Information System (INIS)

    Song Guojun; Zhou Li; Zhang Lei

    2011-01-01

    The National Economic and Social Development Plans (NESDPs) of cities in China, given their comprehensive, integrated and strategic nature, have significant and profound impacts on the development of cities and their embedded ecological environments. Strategic Environmental Assessments (SEAs) on city NESDPs have the potential to improve environmental policy integration at strategic level and to safeguard the sustainable development of cities. However, these plans are normally exempted from the current SEA requirement in China. We argue that it is more feasible to apply SEAs on city NESDPs before SEAs are expanded to higher level NESDPs in China. This article attempts to propose a China-specific institutional design for SEAs on city NESDPs based on experiments in selected cities and within the current legal framework. To obtain a holistic view about the long-term development of cities, more qualitative and descriptive analysis-based assessment methods should be adopted to broaden participation, to encourage the exchange of information and to reach consensus. - Highlights: → National Economic and Social Development Plans for Cities (NESDPs) in China is a very popular and significant decision made by municipal government. → We propose a institutional framework to conduct strategic environmental assessment to NESDPs. → The key features of the institutional framework are the independent SEA approval committee and a professional consulting agency.

  19. Career Development Strivings: Assessing Goals and Motivation in Career Decision-Making and Planning

    Science.gov (United States)

    Dik, Bryan J.; Sargent, Adam M.; Steger, Michael F.

    2008-01-01

    This article describes and demonstrates a novel approach to assessing goals and motives among individuals engaged in the career decision-making and planning process. Participants generated five career development strivings, rated each striving along several dimensions (self-efficacy, outcome expectations, sense of calling, spiritual significance,…

  20. Ordinary risks and accepted fictions: how contrasting and competing priorities work in risk assessment and mental health care planning.

    Science.gov (United States)

    Coffey, Michael; Cohen, Rachel; Faulkner, Alison; Hannigan, Ben; Simpson, Alan; Barlow, Sally

    2017-06-01

    Communication and information sharing are considered crucial to recovery-focused mental health services. Effective mental health care planning and coordination includes assessment and management of risk and safety. Using data from our cross-national mixed-method study of care planning and coordination, we examined what patients, family members and workers say about risk assessment and management and explored the contents of care plans. Thematic analysis of qualitative research interviews (n = 117) with patients, family members and workers, across four English and two Welsh National Health Service sites. Care plans were reviewed (n = 33) using a structured template. Participants have contrasting priorities in relation to risk. Patients see benefit in discussions about risk, but cast the process as a worker priority that may lead to loss of liberty. Relationships with workers are key to family members and patients; however, worker claims of involving people in the care planning process do not extend to risk assessment and management procedures for fear of causing upset. Workers locate risk as coming from the person rather than social or environmental factors, are risk averse and appear to prioritize the procedural aspects of assessment. Despite limitations, risk assessment is treated as legitimate work by professionals. Risk assessment practice operates as a type of fiction in which poor predictive ability and fear of consequences are accepted in the interests of normative certainty by all parties. As a consequence, risk adverse options are encouraged by workers and patients steered away from opportunities for ordinary risks thereby hindering the mobilization of their strengths and abilities. © 2016 The Authors. Health Expectations Published by John Wiley & Sons Ltd.

  1. Risk assessment of major hazards and its application in urban planning: a case study.

    Science.gov (United States)

    Zhou, Yafei; Liu, Mao

    2012-03-01

    With the rapid development of industry in China, the number of establishments that are proposed or under construction is increasing year by year, and many are industries that handle flammable, explosive, toxic, harmful, and dangerous substances. Accidents such as fire, explosion, and toxic diffusion inevitably happen. Accidents resulting from these major hazards in cities cause a large number of casualties and property losses. It is increasingly important to analyze the risk of major hazards in cities realistically and to suitably plan and utilize the surrounding land based on the risk analysis results, thereby reducing the hazards. A theoretical system for risk assessment of major hazards in cities is proposed in this article, and the major hazard risk for the entire city is analyzed quantitatively. Risks of various major accidents are considered together, superposition effect is analyzed, individual risk contours of the entire city are drawn out, and the level of risk in the city is assessed using "as low as reasonably practicable" guidelines. After the entire city's individual risk distribution is obtained, risk zones are divided according to corresponding individual risk value of HSE, and land-use planning suggestions are proposed. Finally, a city in China is used as an example to illustrate the risk assessment process of the city's major hazard and its application in urban land-use planning. The proposed method has a certain theoretical and practical significance in establishing and improving risk analysis of major hazard and urban land-use planning. On the one hand, major urban public risk is avoided; further, the land is utilized in the best possible way in order to obtain the maximum benefit from its use. © 2011 Society for Risk Analysis.

  2. MANAGING SUSTAINABLE DEVELOPMENT OF MEAT PROCESSING PLANTS AS PART OF THE MECHANISM OF STRATEGIC PLANNING

    Directory of Open Access Journals (Sweden)

    I. S. Gusev

    2015-01-01

    Full Text Available Studies have proven that, at present one of the priority research areas as part of the Development Strategy of the Food Processing Industry of the Russian Federation until 2020 is to develop effective mechanisms for sustainable socio-economic development of industrial enterprises. This article investigated the logic of strategic planning within the framework of sustainable economic growth, analyzed the structure of strategic planning, study the subject of strategic planning in the management of sustainable development of enterprises, justified the basic principles of strategic planning for the effective management of sustainable development of industrial enterprises, as well as the complex of organizational tactical activities of operational management strategy for sustainable development of the enterprise. The observation revealed that currently there was a high need for the framework of the branch, departmental and state programs implemented in industrial management of scientific and methodological approaches of strategic planning. Studies have shown that these approaches in its conceptual entity should be based on the growth potential of the sustainable development of meat processing plants in space and time in order to achieve high competitive advantages. Conducted a systematic analysis of industry conditions proved that the problem of sustainable operation and development of meat processing enterprises as a problem of management and control is relatively new, unexplored and highly relevant. On the contrary, it is the basis of modern management strategy and management is a concept and methodology of the so-called adaptive enterprise development under the action of various external and internal factors, risks that may threaten its economic stability and sustainability.

  3. Strategic environmental assessment in tourism planning - Extent of application and quality of documentation

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho Lemos, Clara, E-mail: clara@sc.usp.br [Environmental Engineering Science, Engineering School of Sao Carlos, University of Sao Paulo, Av. Trabalhador Saocarlense, 400, Caixa Postal 292, Sao Carlos, Sao Paulo, 13566-590 (Brazil); Fischer, Thomas B., E-mail: fischer@liverpool.ac.uk [Department of Civic Design, University of Liverpool, 74 Bedford Street South, Liverpool, L69 7ZQ (United Kingdom); Pereira Souza, Marcelo, E-mail: mps@usp.br [Environmental Engineering Science, Engineering School of Sao Carlos, University of Sao Paulo, Av. Trabalhador Saocarlense, 400, Caixa Postal 292, Sao Carlos, Sao Paulo, 13566-590 (Brazil)

    2012-07-15

    Strategic environmental assessment (SEA) has been applied throughout the world in different sectors and in various ways. This paper reports on results of a PhD research on SEA applied to tourism development planning, reflecting the situation in mid-2010. First, the extent of tourism specific SEA application world-wide is established. Then, based on a review of the quality of 10 selected SEA reports, good practice, as well as challenges, trends and opportunities for tourism specific SEA are identified. Shortcomings of SEA in tourism planning are established and implications for future research are outlined. - Highlights: Black-Right-Pointing-Pointer The extent of tourism specific SEA practice is identified. Black-Right-Pointing-Pointer Selected SEA/Tourism reports are evaluated. Black-Right-Pointing-Pointer SEA application to tourism planning is still limited. Black-Right-Pointing-Pointer A number of shortcomings can be pointed out.

  4. Environmental assessment and planning theory: four short stories about power, multiple rationality, and ethics

    International Nuclear Information System (INIS)

    Richardson, Tim

    2005-01-01

    This paper engages with recent debates in the environmental assessment (EA) literature about the lessons that can be learned from planning theory. It argues that the current communicative turn in EA, echoing a similar shift in planning thought in the 1990s, has failed to benefit from this earlier experience. Instead of following this trend, the paper examines EA from a perspective which is more closely aligned with some of the critics of the communicative approach, and which combines concepts of power, rationality, value and ethics in a different way. First, the paper briefly sets out how planning theory has engaged with these concepts. It then argues that EA needs to engage with competing multiple rationalities, and the inescapable presence of value conflicts within EA. It then turns to recent debates in EA to show how the question of value has become a very difficult issue for EA theorists. These issues are then explored by looking at four cases where environmental impact assessment (EIA) and strategic environmental assessment (SEA) become dramatic sites of struggle, in very different ways: where the boundaries between facts, boundaries, and opinions are defined through power struggles; where SEA is used as a process of brokerage between a fragile coalition of interests; where power defines rationality in the construction of an SEA instrument; and where EIA is challenged from the outside by civil society. The paper closes by discussing how EA practitioners can operate reflexively and ethically in a world of contested rationality

  5. Strategic environmental assessment implementation of transport and mobility plans. The case of Italian regions and provinces

    Directory of Open Access Journals (Sweden)

    Andrea De Montis

    2016-06-01

    Full Text Available Transport and mobility plans imply strategies and actions that affect the environment. The European Union has introduced in 2001 the strategic environmental assessment (SEA to take into account and mitigate adverse environmental effects in planning and decision-making. SEA limited implementation has attracted the interest of many scholars that have sought methods able to assess the quality of SEA processes by identifying vices and virtues in practice. In this paper, we measure the quality of eight SEAs for transport and mobility plans of regional and provincial administrations of Italy. Results show that the overall quality level of SEA reports is only barely sufficient, Abruzzo is among the virtuous and Piedmont among the critical administrations. We also stress that the determination of impact significance has received the worse quality score. We finally compare our results to other Italian and British homologous cases finding interesting and generally confirmative evidences.

  6. Basin Assessment Spatial Planning Platform

    Energy Technology Data Exchange (ETDEWEB)

    2017-07-26

    The tool is intended to facilitate hydropower development and water resource planning by improving synthesis and interpretation of disparate spatial datasets that are considered in development actions (e.g., hydrological characteristics, environmentally and culturally sensitive areas, existing or proposed water power resources, climate-informed forecasts). The tool enables this capability by providing a unique framework for assimilating, relating, summarizing, and visualizing disparate spatial data through the use of spatial aggregation techniques, relational geodatabase platforms, and an interactive web-based Geographic Information Systems (GIS). Data are aggregated and related based on shared intersections with a common spatial unit; in this case, industry-standard hydrologic drainage areas for the U.S. (National Hydrography Dataset) are used as the spatial unit to associate planning data. This process is performed using all available scalar delineations of drainage areas (i.e., region, sub-region, basin, sub-basin, watershed, sub-watershed, catchment) to create spatially hierarchical relationships among planning data and drainages. These entity-relationships are stored in a relational geodatabase that provides back-end structure to the web GIS and its widgets. The full technology stack was built using all open-source software in modern programming languages. Interactive widgets that function within the viewport are also compatible with all modern browsers.

  7. 76 FR 70162 - Notice of Intent To Prepare an Environmental Assessment for a Possible Land Use Plan Amendment To...

    Science.gov (United States)

    2011-11-10

    ... whether the Sun Valley Management Framework Plan should be amended to address the sale. To the extent... sale. This notice initiates the public scoping process for the plan amendment and associated EA. The...] Notice of Intent To Prepare an Environmental Assessment for a Possible Land Use Plan Amendment To Provide...

  8. Transformational Assessment: A Simplified Model of Strategic Planning

    Science.gov (United States)

    Bardwell, Rebecca

    2008-01-01

    Strategic planning is a way to evaluate a present situation and set a course for the future. While there is no dearth of literature on Strategic Planning, there appears to be reluctance on the part of K-12 educators to engage in strategic planning. Besides the cynicism about change, another roadblock to strategic planning is the time it takes.…

  9. Knowledge loss risk assessment in Institute for Nuclear Research Pitesti, Romania

    International Nuclear Information System (INIS)

    Apostol, Minodora; Constantin, Marin; Balaceanu, Victoria

    2009-01-01

    This paper presents a method developed in Institute for Nuclear Research Pitesti for knowledge loss risk assessment in nuclear sector, in order to obtain a risk map at departmental and organizational level, by analyzing each position/people. The method starts from the classical method for knowledge loss risk assessment but takes into account the INR characteristics, the particularities of Romanian nuclear market and the difficulties of the classical method to estimate correctly the risk at the job level. A short description of the classical method of knowledge loss risk assessment, the improved method by introducing five new parameters for risk factor of vacant job are presented, how this last method has been applied in some departments from INR Pitesti and the preliminary risk matrix for knowledge loss at organization level is discussed. (authors)

  10. Performance Improvement in 503A Compounding Pharmacies: A PLAN FOR ASSESSMENT, IMPLEMENTATION, AND SUSTAINED SUCCESS.

    Science.gov (United States)

    Pritchett, Jon; Mixon, William; O'Connell, Kevin

    2016-01-01

    Performance improvement is the continual effort to objectively assess current performance and then restructure the practices that support it to more closely achieve desired performance. A plan for performance improvement, unlike other approaches to correcting problems in job fulfillment, is a systematic method used to first find the root causes of areas of concern and then apply corrections to remedy those deficits. Implementing a performance improvement plan that can be easily adapted to ensure compliance with evolving and increasingly complex state and federal regulations is crucial to a successful compounding practice. In this article, we discuss the need for performance improvement in 503A compounding pharmacies, list the steps necessary to develop such a plan, and present three case reports of performance improvement plans in differing compounding settings.

  11. SU-E-T-616: Plan Quality Assessment of Both Treatment Planning System Dose and Measurement-Based 3D Reconstructed Dose in the Patient

    International Nuclear Information System (INIS)

    Olch, A

    2015-01-01

    Purpose: Systematic radiotherapy plan quality assessment promotes quality improvement. Software tools can perform this analysis by applying site-specific structure dose metrics. The next step is to similarly evaluate the quality of the dose delivery. This study defines metrics for acceptable doses to targets and normal organs for a particular treatment site and scores each plan accordingly. The input can be the TPS or the measurement-based 3D patient dose. From this analysis, one can determine whether the delivered dose distribution to the patient receives a score which is comparable to the TPS plan score, otherwise replanning may be indicated. Methods: Eleven neuroblastoma patient plans were exported from Eclipse to the Quality Reports program. A scoring algorithm defined a score for each normal and target structure based on dose-volume parameters. Each plan was scored by this algorithm and the percentage of total possible points was obtained. Each plan also underwent IMRT QA measurements with a Mapcheck2 or ArcCheck. These measurements were input into the 3DVH program to compute the patient 3D dose distribution which was analyzed using the same scoring algorithm as the TPS plan. Results: The mean quality score for the TPS plans was 75.37% (std dev=14.15%) compared to 71.95% (std dev=13.45%) for the 3DVH dose distribution. For 3/11 plans, the 3DVH-based quality score was higher than the TPS score, by between 0.5 to 8.4 percentage points. Eight/11 plans scores decreased based on IMRT QA measurements by 1.2 to 18.6 points. Conclusion: Software was used to determine the degree to which the plan quality score differed between the TPS and measurement-based dose. Although the delivery score was generally in good agreement with the planned dose score, there were some that improved while there was one plan whose delivered dose quality was significantly less than planned. This methodology helps evaluate both planned and delivered dose quality. Sun Nuclear Corporation has

  12. SU-E-T-616: Plan Quality Assessment of Both Treatment Planning System Dose and Measurement-Based 3D Reconstructed Dose in the Patient

    Energy Technology Data Exchange (ETDEWEB)

    Olch, A [University of Southern California, Los Angeles, CA (United States)

    2015-06-15

    Purpose: Systematic radiotherapy plan quality assessment promotes quality improvement. Software tools can perform this analysis by applying site-specific structure dose metrics. The next step is to similarly evaluate the quality of the dose delivery. This study defines metrics for acceptable doses to targets and normal organs for a particular treatment site and scores each plan accordingly. The input can be the TPS or the measurement-based 3D patient dose. From this analysis, one can determine whether the delivered dose distribution to the patient receives a score which is comparable to the TPS plan score, otherwise replanning may be indicated. Methods: Eleven neuroblastoma patient plans were exported from Eclipse to the Quality Reports program. A scoring algorithm defined a score for each normal and target structure based on dose-volume parameters. Each plan was scored by this algorithm and the percentage of total possible points was obtained. Each plan also underwent IMRT QA measurements with a Mapcheck2 or ArcCheck. These measurements were input into the 3DVH program to compute the patient 3D dose distribution which was analyzed using the same scoring algorithm as the TPS plan. Results: The mean quality score for the TPS plans was 75.37% (std dev=14.15%) compared to 71.95% (std dev=13.45%) for the 3DVH dose distribution. For 3/11 plans, the 3DVH-based quality score was higher than the TPS score, by between 0.5 to 8.4 percentage points. Eight/11 plans scores decreased based on IMRT QA measurements by 1.2 to 18.6 points. Conclusion: Software was used to determine the degree to which the plan quality score differed between the TPS and measurement-based dose. Although the delivery score was generally in good agreement with the planned dose score, there were some that improved while there was one plan whose delivered dose quality was significantly less than planned. This methodology helps evaluate both planned and delivered dose quality. Sun Nuclear Corporation has

  13. A technology-assessment methodology for electric utility planning: With application to nuclear power plant decommissioning

    International Nuclear Information System (INIS)

    Lough, W.T.

    1987-01-01

    Electric utilities and public service commissions have not taken full advantage of the many proven methodologies and techniques available for evaluating complex technological issues. In addition, evaluations performed are deficient in their use of (1) methods for evaluating public attitudes and (2) formal methods of analysis for decision making. These oversight are substantiated through an examination of the literature relevant to electric utility planning. The assessment process known as technology assessment or TA is proposed, and a TA model is developed for route in use in utility planning by electric utilities and state regulatory commissions. Techniques to facilitate public participation and techniques to aid decision making are integral to the proposed model and are described in detail. Criteria are provided for selecting an appropriate technique on a case-by-case basis. The TA model proved to be an effective methodology for evaluating technological issues associated with electric utility planning such as decommissioning nuclear power plants. Through the use of the nominal group technique, the attitudes of a group of residential ratepayers were successfully identified and included in the decision-making process

  14. The eastern Baltic cod fishery: a fleet-based management strategy evaluation framework to assess the cod recovery plan of 2008

    DEFF Research Database (Denmark)

    Bastardie, Francois; Nielsen, J. Rasmus; Kraus, Gerd

    2010-01-01

    The eastern Baltic cod fishery: a fleet-based management strategy evaluation framework to assess the cod recovery plan of 2008. - ICES Journal of Marine Science, 67: 71-86.......The eastern Baltic cod fishery: a fleet-based management strategy evaluation framework to assess the cod recovery plan of 2008. - ICES Journal of Marine Science, 67: 71-86....

  15. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    Science.gov (United States)

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  16. Combining pre-spill shoreline segmentation data and shoreline assessment tools to support early response management and planning

    International Nuclear Information System (INIS)

    Lamarche, A.; Owens, E.H.; Martin, V.; Laforest, S.

    2003-01-01

    Several organizations, such as Environment Canada and the Alyeska Pipeline Service Company, are developing or refining pre-spill databases containing information about physical shoreline characteristics. Automated links between these pre-spill shoreline characteristic databases and computerized shoreline assessment tools were recently created by Environment Canada (Quebec and Ontario regions). The tools, which use Geographical Information System (GIS) technology, can be used for planning and documenting support needed for shoreline cleanup operations. A training exercise, designed to evaluate a spill management system integrating the Quebec region pre-spill shoreline database and the ShoreAssess R shoreline assessment system, was conducted at Vercheres, Quebec in October 2002 by Eastern Canada Response Corporation. The testing took place during the planning stage of the early phases of a spill, namely after the first over-flight. The computerized shoreline assessment tools made it possible to evaluate the length and type of shoreline that would potentially be impacted by oil. The tools also made it possible to assess the shoreline treatment methods most likely to be used, and evaluate the probable duration of the cleanup operation. The information would have to be available in time to be considered during the planning activities. The training exercise demonstrated that the integration of the databases is a valuable tool during the early phases of an oil spill response. 9 refs., 2 tabs., 6 figs

  17. Applying geographic information systems to support strategic environmental assessment: Opportunities and limitations in the context of Irish land-use plans

    International Nuclear Information System (INIS)

    Gonzalez, Ainhoa; Gilmer, Alan; Foley, Ronan; Sweeney, John; Fry, John

    2011-01-01

    The strengthening of spatial database infrastructures, further promoted by the INSPIRE Directive adopted in 2007, has led to an increased use of spatial data in planning and decision-making. Given that land-use plans are intrinsically spatial, such evidence and approaches can significantly benefit plan-making. A spatial framework could especially support the specific Strategic Environmental Assessment (SEA) aspects of the plan-making process. Spatial tools such as Geographic Information Systems (GIS) are particularly well-placed to support the environmental integration sought in SEA by providing evidence through the spatial assessment of multiple environmental datasets. Moreover, GIS bring the opportunity to augment conventional assessment techniques (e.g. matrix-based assessments) by acting as visual mediators of spatial knowledge and by providing an effective tool for the spatial and temporal analysis of environmental impacts. This paper presents a GIS-based approach to SEA (GISEA), and analyses the above premise by evaluating the barriers, limitations, opportunities and benefits of its implementation. The GISEA approach has been applied to seven development plans of differing scales in the Republic of Ireland. The results of the case studies revealed that current issues in SEA (e.g. restricted time-frames and institutional arrangements) condition the implementation of a GIS-based approach. Moreover, GIS expertise, data accessibility and quality remain limiting factors to an effective GIS application in SEA. However, the results also confirmed that GIS have the potential to increase the objectivity and accuracy of the assessment, enhance both the understanding of environmental and planning considerations and the delivery of information, and, therefore, help to improve the effectiveness of SEA practice.

  18. Integration of environmental flow assessment and freshwater conservation planning: a new era in catchment management

    CSIR Research Space (South Africa)

    Nel, JL

    2011-03-01

    Full Text Available Integrated water resources management offers an ideal platform for addressing the goals of freshwater conservation and climate change adaptation. Environmental flow assessment and systematic conservation planning have evolved separately...

  19. An exploratory study of the influence of national and state standards on middle school science teachers' classroom assessment practices

    Science.gov (United States)

    McWaters, Kathy Jean

    2001-07-01

    Classroom assessment practices of middle school science teachers were identified and the influence of national and state science standards on these practices was examined. In Phase I of this study a mail questionnaire was sent to 450 middle school (grades 5,6,7 and 8) science teachers in 17 parishes in Louisiana to obtain information about their classroom assessment practices. In Phase II, nine middle school teachers in eight departmentalized classrooms, two classes at each grade, participated in a qualitative study. Data were collected through questionnaires, classroom observations, interviews and document analysis. Data analysis revealed three major categories of classroom assessment targets: (a) student achievement, (b) student attitudes and, (c) student products. Results indicated that most teachers are using different assessment methods when assessing different achievement targets, as recommended by science reform documents. It was also determined that many teachers are using appropriate methods to assess student learning. While teachers reported that students spend an inordinate amount of time engaged in assessment activities, classroom observations suggested that the activities were not always written tests or graded activities. Another key finding is that there is a disconnect between the quality of teaching and the quality of assessment. Teachers who teach the material recommended by science reform documents and use recommended instructional strategies were observed to stop teaching and engage students in a "test rehearsal" geared towards rote memorization of factual information. Data suggest that the national and state science content standards are influencing the content and the format of teacher-made tests. Teachers' reported using the standards during assessment construction or selection in a wide variety of ways. The most direct use of the standards reported was to select content, format and cognitive level for test items. A more circumspect approach

  20. Remedial action and waste disposal project -- 300-FF-1 remedial action readiness assessment plan

    International Nuclear Information System (INIS)

    April, J.G.; Carlson, R.A.; Greif, A.A.; Johnson, C.R.; Orewiler, R.I.; Perry, D.M.; Plastino, J.C.; Roeck, F.V.; Tuttle, B.G.

    1997-04-01

    This Readiness Assessment Plan presents the methodology used to assess the readiness of the 300-FF-1 Remedial Action Project. Remediation involves the excavation, treatment if applicable, and final disposal of contaminated soil and debris associated with the waste sites in the 300-FF-1 Operable Unit. The scope of the 300-FF-1 remediation is to excavate, transport, and dispose of contaminated solid from sites identified in the 300-FF-1 Operable Unit

  1. Clinical Reasoning in the Assessment and Intervention Planning for Attention-Deficit/Hyperactivity Disorder

    Science.gov (United States)

    Climie, Emma A.; Mah, Janet W. T.; Chase, Cheryl Y.

    2017-01-01

    The purpose of this article is to provide the reader with insight into the clinical reasoning involved in the assessment and intervention planning for a child with Attention-Deficit/Hyperactivity Disorder. The reader will be guided through the authors' conceptualization of this case, and suggestions for intervention in the classroom will be…

  2. 1998 242-A interim evaporator tank system integrity assessment plan

    Energy Technology Data Exchange (ETDEWEB)

    Jensen, C.E.

    1998-03-31

    Portions of the 242-A Evaporator on the Hanford Site must be assessed to meet the requirements of the Washington State Department of Ecology`s Dangerous Waste Regulation, Washington Administrative Code (WAC) 173-303. The assessment is limited to the provisions of Section 173-303-640. This Integrity Assessment Plan (IAP) identifies tasks which will be performed during the assessment phase and describes the intended assessment techniques. The 242-A Evaporator facility processes waste solutions from most of the operating laboratories and plants of the Hanford Site. The waste solutions are concentrated in the evaporator to a slurry of liquid and crystallized salts. This concentrated slurry is returned to the Tank Farms at a significantly reduce volume. The water vapor from the evaporation process is condensed, filtered, and can be pumped through an ion exchange bed before transfer to a retention basin. The non-condensable portion of the vapor is filtered and continuously monitored before venting to the atmosphere. The 242-A Evaporator will be assessed as seven subsystems. Four of the subsystems store, transport or treat Washington State Dangerous wastes, the other three subsystems are integral parts of the process, however, they do not directly store, transfer, or treat listed dangerous wastes. The facility will be inspected, tested, and analyzed through this assessment. The seven subsystems, defined in detail in Appendix B, are: Evaporator Process and Slurry Subsystem; Vapor Condenser Subsystem; Vessel Vent Subsystem; Process Condensate Subsystem; Steam Condensate Subsystem; Raw Water Disposal Subsystem; and Building and Secondary Containment Subsystem.

  3. 1998 242-A interim evaporator tank system integrity assessment plan

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1998-01-01

    Portions of the 242-A Evaporator on the Hanford Site must be assessed to meet the requirements of the Washington State Department of Ecology's Dangerous Waste Regulation, Washington Administrative Code (WAC) 173-303. The assessment is limited to the provisions of Section 173-303-640. This Integrity Assessment Plan (IAP) identifies tasks which will be performed during the assessment phase and describes the intended assessment techniques. The 242-A Evaporator facility processes waste solutions from most of the operating laboratories and plants of the Hanford Site. The waste solutions are concentrated in the evaporator to a slurry of liquid and crystallized salts. This concentrated slurry is returned to the Tank Farms at a significantly reduce volume. The water vapor from the evaporation process is condensed, filtered, and can be pumped through an ion exchange bed before transfer to a retention basin. The non-condensable portion of the vapor is filtered and continuously monitored before venting to the atmosphere. The 242-A Evaporator will be assessed as seven subsystems. Four of the subsystems store, transport or treat Washington State Dangerous wastes, the other three subsystems are integral parts of the process, however, they do not directly store, transfer, or treat listed dangerous wastes. The facility will be inspected, tested, and analyzed through this assessment. The seven subsystems, defined in detail in Appendix B, are: Evaporator Process and Slurry Subsystem; Vapor Condenser Subsystem; Vessel Vent Subsystem; Process Condensate Subsystem; Steam Condensate Subsystem; Raw Water Disposal Subsystem; and Building and Secondary Containment Subsystem

  4. Tumulus Disposal Demonstration Project assessment plan for potential worker exposure: Revision 1

    International Nuclear Information System (INIS)

    Styers, D.R.

    1989-03-01

    The purpose of the ''Assessment Plan for Potential Worker Exposure'' is to determine the potential radiological exposures to the workers as they dispose of low-level radioactive wastes (LLW) on the Tumulus Disposal Demonstration Project (TDDP). An evaluation of the work procedures and precautions will be made so as to maintain the exposure levels As Low As Reasonably Achievable (ALARA). 10 refs., 10 figs

  5. Views on planning and expectations of SEA: the case of transport planning

    International Nuclear Information System (INIS)

    Hilden, Mikael; Furman, Eeva; Kaljonen, Minna

    2004-01-01

    This paper examines the effectiveness of strategic environmental assessment (SEA) in transport planning in the light of different views of planning: synoptic optimising planning, communicative planning and planning as a social struggle. The analysis uses empirical materials from 17 case studies collected by survey from Member Countries of the United Nation's Economic Commission for Europe (UN/ECE) and further processed in a practitioners' workshop, and also a detailed case study carried out in Finland. The case studies and the workshop identified a set of necessary conditions and facilitating factors that contribute to the effectiveness of strategic environmental assessments in transport planning. Our findings suggest that transport planning can often best be characterised as a social struggle over problem definitions and future choices. Thus, the effectiveness of SEA will depend on how well the assessment fits into the planning context and on its actual contribution to debates on problem definitions. Specific procedural steps may improve the effectiveness but explicit requirements to recognise SEA in decision making are likely to be a key condition

  6. US country studies program: Support for climate change studies, national plans, and technology assessments

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    This paper describes the objectives of the next phase of the U.S. Country Studies Program which was launched in support of the Framework Convention on Climate Change (FCCC). The next phases of this program aim to: assist countries in preparing Climate Change Action plans; support technology assessments and development of technology initiatives; enhance exchange of information and expertise in support of FCCC. The program offers support for these processes in the form of handbooks which have been published to aid in preparing action plans, and to provide information on methane, forestry, and energy technologies. In addition an array of training workshops have been and are scheduled to offer hands on instruction to participants, expert advice is available from trained personnel, and modeling tools are available to aid in development of action plans.

  7. Strategic environmental assessment in tourism planning — Extent of application and quality of documentation

    International Nuclear Information System (INIS)

    Carvalho Lemos, Clara; Fischer, Thomas B.; Pereira Souza, Marcelo

    2012-01-01

    Strategic environmental assessment (SEA) has been applied throughout the world in different sectors and in various ways. This paper reports on results of a PhD research on SEA applied to tourism development planning, reflecting the situation in mid-2010. First, the extent of tourism specific SEA application world-wide is established. Then, based on a review of the quality of 10 selected SEA reports, good practice, as well as challenges, trends and opportunities for tourism specific SEA are identified. Shortcomings of SEA in tourism planning are established and implications for future research are outlined. - Highlights: ► The extent of tourism specific SEA practice is identified. ► Selected SEA/Tourism reports are evaluated. ► SEA application to tourism planning is still limited. ► A number of shortcomings can be pointed out.

  8. Readiness assessment plan for the Radioactive Mixed Waste Land Disposal Facility (Trench 31)

    International Nuclear Information System (INIS)

    Irons, L.G.

    1994-01-01

    This document provides the Readiness Assessment Plan (RAP) for the Project W-025 (Radioactive Mixed Waste Land Disposal Facility) Readiness Assessment (RA). The RAP documents prerequisites to be met by the operating organization prior to the RA. The RAP is to be implemented by the RA Team identified in the RAP. The RA Team is to verify the facility's compliance with criteria identified in the RAP. The criteria are based upon the open-quotes Core Requirementsclose quotes listed in DOE Order 5480.31, open-quotes Startup and Restart of Nuclear Facilitiesclose quotes

  9. Defining the management role of the department medical director.

    Science.gov (United States)

    Brady, T F; Carpenter, C R

    1986-01-01

    Through analysis of medical and administrative director positions it is possible to identify an organizational structure for medical departments that enhances departmental operations. Possible roles and tasks that describe managerial responsibilities are considered, and a review of the literature identifies options for how these roles or tasks can be shared between medical and nonmedical managers at the departmental level. These options are refined based on interviews with department-level managers at a case study hospital. Three models are then explored: unity of command, shared accountability, and split accountability. The unity of command model is recommended. In this model, the medical director assumes total authority and accountability for departmental operations through some sort of "enfranchisement." A more formal planning process and a review of job descriptions are also recommended.

  10. Advanced Seismic Probabilistic Risk Assessment Demonstration Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Coleman, Justin [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    Idaho National Laboratories (INL) has an ongoing research and development (R&D) project to remove excess conservatism from seismic probabilistic risk assessments (SPRA) calculations. These risk calculations should focus on providing best estimate results, and associated insights, for evaluation and decision-making. This report presents a plan for improving our current traditional SPRA process using a seismic event recorded at a nuclear power plant site, with known outcomes, to improve the decision making process. SPRAs are intended to provide best estimates of the various combinations of structural and equipment failures that can lead to a seismic induced core damage event. However, in general this approach has been conservative, and potentially masks other important events (for instance, it was not the seismic motions that caused the Fukushima core melt events, but the tsunami ingress into the facility).

  11. Scientific information and the Tongass land management plan: key findings derived from the scientific literature, species assessments, resource analyses, workshops, and risk assessment panels.

    Science.gov (United States)

    Douglas N. Swanston; Charles G. Shaw; Winston P. Smith; Kent R. Julin; Guy A. Cellier; Fred H. Everest

    1996-01-01

    This document highlights key items of information obtained from the published literature and from specific assessments, workshops, resource analyses, and various risk assessment panels conducted as part of the Tongass land management planning process. None of this information dictates any particular decision; however, it is important to consider during decisionmaking...

  12. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: The city of Belgrade

    International Nuclear Information System (INIS)

    Josimović, Boško; Marić, Igor; Milijić, Saša

    2015-01-01

    Highlights: • The paper deals with the specific method of multi-criteria evaluation applied in drafting the SEA for the Belgrade WMP. • MCE of the planning solutions, assessed according to 37 objectives of the SEA and four sets of criteria, was presented in the matrix form. • The results are presented in the form of graphs so as to be easily comprehensible to all the participants in the decision-making process. • The results represent concrete contribution proven in practice. - Abstract: Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results

  13. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: The city of Belgrade

    Energy Technology Data Exchange (ETDEWEB)

    Josimović, Boško, E-mail: bosko@iaus.ac.rs; Marić, Igor; Milijić, Saša

    2015-02-15

    Highlights: • The paper deals with the specific method of multi-criteria evaluation applied in drafting the SEA for the Belgrade WMP. • MCE of the planning solutions, assessed according to 37 objectives of the SEA and four sets of criteria, was presented in the matrix form. • The results are presented in the form of graphs so as to be easily comprehensible to all the participants in the decision-making process. • The results represent concrete contribution proven in practice. - Abstract: Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results.

  14. Environmental impact assessment applied to planning activities

    International Nuclear Information System (INIS)

    Vismara, R.

    1994-01-01

    Object of EEC (European Economic Community) directive and italian law are certain public and private projects. However, more recent tendency are moving to an application on planning action too. There is no doubt that EIA (Environmental Impact Analysis) on project is very different than EIA on plans. Obviously EIA on a sectorial plan is not an addition of singular EIA on project. The new main objectives shall be: identification of critical areas; identification of interaction between different projects and between different factors; identification of critical project. A methodology to quantify these objectives in matricial form is presented

  15. An operational information systems architecture for assessing sustainable transportation planning: principles and design.

    Science.gov (United States)

    Borzacchiello, Maria Teresa; Torrieri, Vincenzo; Nijkamp, Peter

    2009-11-01

    This paper offers the description of an integrated information system framework for the assessment of transportation planning and management. After an introductory exposition, in the first part of the paper, a broad overview of international experiences regarding information systems on transportation is given, focusing in particular on the relationship between transportation system's performance monitoring and the decision-making process, and on the importance of this connection in the evaluation and planning process, in Italian and European cases. Next, the methodological design of an information system to support efficient and sustainable transportation planning and management aiming to integrate inputs from several different data sources is presented. The resulting framework deploys modular and integrated databases which include data stemming from different national or regional data banks and which integrate information belonging to different transportation fields. For this reason, it allows public administrations to account for many strategic elements that influence their decisions regarding transportation, both from a systemic and infrastructural point of view.

  16. Application of an uncertainty analysis approach to strategic environmental assessment for urban planning.

    Science.gov (United States)

    Liu, Yi; Chen, Jining; He, Weiqi; Tong, Qingyuan; Li, Wangfeng

    2010-04-15

    Urban planning has been widely applied as a regulatory measure to guide a city's construction and management. It represents official expectations on future population and economic growth and land use over the urban area. No doubt, significant variations often occur between planning schemes and actual development; in particular in China, the world's largest developing country experiencing rapid urbanization and industrialization. This in turn leads to difficulty in estimating the environmental consequences of the urban plan. Aiming to quantitatively analyze the uncertain environmental impacts of the urban plan's implementation, this article developed an integrated methodology combining a scenario analysis approach and a stochastic simulation technique for strategic environmental assessment (SEA). Based on industrial development scenarios, Monte Carlo sampling is applied to generate all possibilities of the spatial distribution of newly emerged industries. All related environmental consequences can be further estimated given the industrial distributions as input to environmental quality models. By applying a HSY algorithm, environmentally unacceptable urban growth, regarding both economic development and land use spatial layout, can be systematically identified, providing valuable information to urban planners and decision makers. A case study in Dalian Municipality, Northeast China, is used to illustrate applicability of this methodology. The impacts of Urban Development Plan for Dalian Municipality (2003-2020) (UDP) on atmospheric environment are also discussed in this article.

  17. Indicators' role: How do they influence Strategic Environmental Assessment and Sustainable Planning - The Chinese experience.

    Science.gov (United States)

    Gao, Jingjing; Christensen, Per; Kørnøv, Lone

    2017-08-15

    As an information carrier and communication medium, indicators provide useful decision-making assistance in setting process goals and effectively reaching the goals. The main focus of this article is to investigate indicators' role in influencing planning through Strategic Environmental Assessment (SEA) especially related to Chinese experiences. From the perspective of planning and decision-making theory, the influence on planning is studied as influence of planning structure and influence of planning actors. Such a conceptual framework is applied in order to demonstrate how the use of indicators can influence planning through a SEA process. The study holds two empirical levels. On a general level, based on an online survey, this article investigates SEA practitioners' experiences in using indicators. On a case level, two urban plans are selected to provide more detailed experiences. The case level investigation is based on a documentary study and individual interviews with SEA practitioners/planners. By exploring how indicators influence planning through the structure of and the actors within SEA, this study tries to provide an overview of indicators' role in SEA. The results indicate that indicators are perceived as a useful tool in the Chinese SEA system. By improving and simplifying the procedures of SEA, the indicators exert more structural influence on SEA and on plan making. On the other hand, indicators are also shown to have more influence through political actors than found among technical actors. Copyright © 2017. Published by Elsevier B.V.

  18. Effects of action planning and coping planning within the theory of planned behaviour

    DEFF Research Database (Denmark)

    Pakpour, Amir H.; Zedi, Isa mohammadi; Chatzisarantis, Nikos

    2011-01-01

    Objective: Patients on dialysis have low physical activity levels. The aim of the study was to examine the validity of action planning and coping planning within the theory of planned behaviour framework, for predicting physical activity behaviour of patients on hemodialysis. Methods: One hundred...... and forty four patients who were undergoing emodialysis were selected from dialysis centers. The mean age of the patients was 56.61 (SD= 11.38) years. The patients completed a questionnaire including variables from the theory of planned behaviour, action planning and coping planning. Physical activity...... was prospectively assessed at 4-weeks with the validated International Physical Activity Questionnaire self-report measure. A hierarchical regression analysis was performed to examine the effects of action planning and coping planning on physical activity behaviour. Results: There was a main effect for coping...

  19. Forensic mental health services: Current service provision and planning for a prison mental health service in the Eastern Cape

    Directory of Open Access Journals (Sweden)

    Kiran Sukeri

    2016-05-01

    Full Text Available Objectives: No research data exists on forensic psychiatric service provision in the Eastern Cape, Republic of South Africa. The objective of this research was to assess current forensic psychiatric service provision and utilisation rates at Fort England Hospital. This is important in improving and strengthening the service. A related objective was to develop a model for a provincial prison mental health service. Methodology: This study is a situational analysis of an existing forensic psychiatric service in the Eastern Cape. The design of the study was cross sectional. An audit questionnaire was utilised to collate quantitative data, which was submitted to Fort England Hospital, Grahamstown. A proposed prison mental health service was developed utilising prevalence rates of mental illness among prisoners to calculate bed and staff requirements for an ambulatory and in-patient service. Results: During the study period a total of 403 remand detainees were admitted to the forensic psychiatry division of Fort England Hospital. The average length of stay was 494 days and the bed utilisation rate was determined at 203.54%. We estimate that to provide a provincial prison mental health service to treat psychotic illnesses and major depression the province requires a 52 bedded facility and a total staff complement of approximately 31. Conclusions: Forensic psychiatric services include the assessment, management and treatment of mentally disordered persons in conflict with the law and prisoners requiring psychiatric assessments. The Eastern Cape Province does not have plans or policies to assess and manage mentally ill offenders, resulting in an increased load on available services. We recommend that an inter-departmental task team, which includes Health, Justice and Constitutional Development and Correctional Services, should be established in the province, to develop a strategy to assist in the development of an effective and efficient forensic

  20. Dynamics in self-regulation : Plan execution self-efficacy and mastery of action plans

    OpenAIRE

    Scholz, Urte; Sniehotta, Falco F.; Schüz, Benjamin; Oeberst, Andries

    2007-01-01

    This study investigated whether an individual's plan execution self-efficacy precedes mastery of the respective action plan or vice versa. Study participants were 122 cardiac rehabilitation patients. Plan execution self-efficacy and mastery of a personal action plan on physical activity were assessed each week for 6 weeks after discharge from rehabilitation. Physical exercise was assessed 2 months after discharge. Multilevel cross-lagged panel analyses resulted in a positive effect of mastery...

  1. Net Zero Energy Military Installations: A Guide to Assessment and Planning

    Energy Technology Data Exchange (ETDEWEB)

    Booth, S.; Barnett, J.; Burman, K.; Hambrick, J.; Westby, R.

    2010-08-01

    The U.S. Department of Defense (DoD) recognizes the strategic importance of energy to its mission, and is working to reduce energy consumption and enhance energy self-sufficiency by drawing on local clean energy sources. A joint initiative formed between DoD and the U.S. Department of Energy (DOE) in 2008 to address military energy use led to a task force to examine the potential for net zero energy military installations, which would produce as much energy on site as they consume in buildings, facilities, and fleet vehicles. This report presents an assessment and planning process to examine military installations for net zero energy potential. Net Zero Energy Installation Assessment (NZEIA) presents a systematic framework to analyze energy projects at installations while balancing other site priorities such as mission, cost, and security.

  2. Assessment of China's renewable energy contribution during the 12th Five Year Plan

    International Nuclear Information System (INIS)

    Hong, Lixuan; Zhou, Nan; Fridley, David; Raczkowski, Chris

    2013-01-01

    In recent years, China has been ambitious in investing and developing renewable energy technologies, aiming to enhance its energy security, mitigate its energy-related CO 2 emissions and develop renewable energy industry. The 12th Five Year Plan (2011–2015) has set clear targets on installed capacities of different renewable energy technologies. This study aimed to assess the possible contribution of 12th Five Year Plan for China's future energy system and identify factors that might influence its impacts. First, current status of renewable energy development in China has been reviewed. Then several energy scenarios have been developed in an hourly simulation using an energy system analysis tool EnergyPLAN. It was identified that existing grid bottleneck would greatly reduce the potential contribution of renewable installations in terms of share of renewable electricity generation, share of non-fossil fuels in primary energy and system CO 2 emissions. In contrast, improving technical performance of renewable energy technologies and sectoral energy efficiency plays an important role in increasing the share of renewables and promoting China’s energy system transition. Finally, some policy suggestions were drawn to facilitate a better implementation of the renewable energy plan. - Highlights: • China's renewable energy contribution during the 12th Five Year Plan was assessed. • Non-fossil fuel targets in primary energy for 2015 and 2020 could be easily achieved. • Grid bottlenecks severely decrease the share of RES-E in electricity generation through the 12th Five Year Period. • Improved technical performance of renewable technologies and sectoral energy efficiency are extremely important for achieving higher RES-E share. • Several policy suggestions were drawn

  3. Applying Geographic Information Systems to Support Strategic Environmental Assessment: Opportunities and Limitations in the Context of Irish Land-use Plans

    OpenAIRE

    Gonzalez, Ainhoa; Gilmer, Alan; Foley, Ronan; Sweeney, John; Fry, John

    2010-01-01

    The strengthening of spatial database infrastructures, further promoted by the INSPIRE Directive adopted in 2007, has led to an increased use of spatial data in planning and decision-making. Given that land-use plans are intrinsically spatial, such evidence and approaches can significantly benefit plan-making. A spatial framework could especially support the specific Strategic Environmental Assessment (SEA) aspects of the plan-making process. Spatial tools such as Geographic Information Syste...

  4. Jordan's 2002 to 2012 Fertility Stall and Parallel USAID Investments in Family Planning: Lessons From an Assessment to Guide Future Programming.

    Science.gov (United States)

    Spindler, Esther; Bitar, Nisreen; Solo, Julie; Menstell, Elizabeth; Shattuck, Dominick

    2017-12-28

    Health practitioners, researchers, and donors are stumped about Jordan's stalled fertility rate, which has stagnated between 3.7 and 3.5 children per woman from 2002 to 2012, above the national replacement level of 2.1. This stall paralleled United States Agency for International Development (USAID) funding investments in family planning in Jordan, triggering an assessment of USAID family planning programming in Jordan. This article describes the methods, results, and implications of the programmatic assessment. Methods included an extensive desk review of USAID programs in Jordan and 69 interviews with reproductive health stakeholders. We explored reasons for fertility stagnation in Jordan's total fertility rate (TFR) and assessed the effects of USAID programming on family planning outcomes over the same time period. The assessment results suggest that the increased use of less effective methods, in particular withdrawal and condoms, are contributing to Jordan's TFR stall. Jordan's limited method mix, combined with strong sociocultural determinants around reproduction and fertility desires, have contributed to low contraceptive effectiveness in Jordan. Over the same time period, USAID contributions toward increasing family planning access and use, largely focused on service delivery programs, were extensive. Examples of effective initiatives, among others, include task shifting of IUD insertion services to midwives due to a shortage of female physicians. However, key challenges to improved use of family planning services include limited government investments in family planning programs, influential service provider behaviors and biases that limit informed counseling and choice, pervasive strong social norms of family size and fertility, and limited availability of different contraceptive methods. In contexts where sociocultural norms and a limited method mix are the dominant barriers toward improved family planning use, increased national government investments

  5. Strategic Environmental Assessment as catalyst of healthier spatial planning: The Danish guidance and practice

    DEFF Research Database (Denmark)

    Kørnøv, Lone

    2009-01-01

    and guidance. This paper examines the inclusion of health as a formal component in impact assessment of spatial plans. Based upon a documentary study of 100 environmental reports, the paper analyses and discusses how health impact considerations are incorporated in SEA practice. It is found that health impacts...

  6. Assessment of Scheduling and Plan Execution of Apollo 14 Lunar Surface Operations

    Science.gov (United States)

    Marquez, Jessica J.

    2010-01-01

    Although over forty years have passed since first landing on the Moon, there is not yet a comprehensive, quantitative assessment of Apollo extravehicular activities (EVAs). Quantitatively evaluating lunar EVAs will provide a better understanding of the challenges involved with surface operations. This first evaluation of a surface EVA centers on comparing the planned and the as-ran timeline, specifically collecting data on discrepancies between durations that were estimated versus executed. Differences were summarized by task categories in order to gain insight as to the type of surface operation activities that were most challenging. One Apollo 14 EVA was assessed utilizing the described methodology. Selected metrics and task categorizations were effective, and limitations to this process were identified.

  7. Environmental impact assessment in urban transport planning: Exploring process-related barriers in Spanish practice

    Energy Technology Data Exchange (ETDEWEB)

    Soria-Lara, Julio A., E-mail: j.a.sorialara@uva.nl; Bertolini, Luca, E-mail: l.bertolini@uva.nl; Brömmelstroet, Marco te, E-mail: M.C.G.teBrommelstroet@uva.nl

    2015-01-15

    The effectiveness of EIA for evaluating transport planning projects is increasingly being questioned by practitioners, institutions and scholars. The academic literature has traditionally focused more on solving content-related problems with EIA (i.e. the measurement of environmental effects) than on process-related issues (i.e. the role of EIA in the planning process and the interaction between key actors). Focusing only on technical improvements is not sufficient for rectifying the effectiveness problems of EIA. In order to address this knowledge gap, the paper explores how EIA is experienced in the Spanish planning context and offers in-depth insight into EIA process-related issues in the field of urban transport planning. From the multitude of involved actors, the research focuses on exploring the perceptions of the two main professional groups: EIA developers and transport planners. Through a web-based survey we assess the importance of process-related barriers to the effective use of EIA in urban transport planning. The analyses revealed process issues based fundamentally on unstructured stakeholders involvement and an inefficient public participation - Highlights: • Qualitative research on perceptions of EIA participants on EIA processes. • Web-based survey with different participants (EIA-developers; transport planners). • It was seen an inefficient participation of stakeholders during the EIA processes.

  8. Environmental impact assessment in urban transport planning: Exploring process-related barriers in Spanish practice

    International Nuclear Information System (INIS)

    Soria-Lara, Julio A.; Bertolini, Luca; Brömmelstroet, Marco te

    2015-01-01

    The effectiveness of EIA for evaluating transport planning projects is increasingly being questioned by practitioners, institutions and scholars. The academic literature has traditionally focused more on solving content-related problems with EIA (i.e. the measurement of environmental effects) than on process-related issues (i.e. the role of EIA in the planning process and the interaction between key actors). Focusing only on technical improvements is not sufficient for rectifying the effectiveness problems of EIA. In order to address this knowledge gap, the paper explores how EIA is experienced in the Spanish planning context and offers in-depth insight into EIA process-related issues in the field of urban transport planning. From the multitude of involved actors, the research focuses on exploring the perceptions of the two main professional groups: EIA developers and transport planners. Through a web-based survey we assess the importance of process-related barriers to the effective use of EIA in urban transport planning. The analyses revealed process issues based fundamentally on unstructured stakeholders involvement and an inefficient public participation - Highlights: • Qualitative research on perceptions of EIA participants on EIA processes. • Web-based survey with different participants (EIA-developers; transport planners). • It was seen an inefficient participation of stakeholders during the EIA processes

  9. Radiological/toxicological sabotage assessments at the Savannah River Site

    International Nuclear Information System (INIS)

    Johnson, H.D.; Pascal, M.D.; Richardson, D.L.

    1995-01-01

    This paper describes the methods being employed by Westinghouse Savannah River Company (WSRC) to perform graded assessments of radiological and toxicological sabotage vulnerability at Savannah River Site (SRS) facilities. These assessments are conducted to ensure that effective measures are in place to prevent, mitigate, and respond to a potential sabotage event which may cause an airborne release of radiological/toxicological material, causing an adverse effect on the health and safety of employees, the public, and the environment. Department of Energy (DOE) Notice 5630.3A, open-quotes Protection of Departmental Facilities Against Radiological and Toxicological Sabotage,close quotes and the associated April 1993 DOE-Headquarters guidance provide the requirements and outline an eight-step process for hazardous material evaluation. The process requires the integration of information from a variety of disciplines, including safety, safeguards and security, and emergency preparedness. This paper summarizes WSRC's approach towards implementation of the DOE requirements, and explains the inter-relationships between the Radiological and Toxicological Assessments developed using this process, and facility Hazard Assessment Reports (HAs), Safety Analysis Reports (SARs), and Facility Vulnerability Assessments (VAs)

  10. Impact of the introduction of weekly radiotherapy quality assurance meetings at one UK cancer centre

    Science.gov (United States)

    Brammer, C V; Allerton, R; Churn, M; Joseph, M; Koh, P; Sayers, I; King, M

    2014-01-01

    Objective: The complexity of radiotherapy planning is increasing rapidly. Delivery and planning is subject to detailed quality assurance (QA) checks. The weakest link is often the oncologists' delineation of the clinical target volume (CTV). Weekly departmental meetings for radiotherapy QA (RTQA) were introduced into the Royal Wolverhampton Hospital, Wolverhampton, UK, in October 2011. This article describes the impact of this on patient care. Methods: CTVs for megavoltage photon radiotherapy courses for all radical, adjuvant and palliative treatments longer than five fractions (with the exception of two field tangential breast treatments not enrolled into clinical trials) were reviewed in the RTQA meeting. Audits were carried out in January 2012 (baseline) and September 2013, each over a 4-week period. Adherence to departmental contouring protocols was assessed and the number of major and minor alterations following peer review were determined. Results: There was no statistically significant difference for major alterations between the two study groups; 8 alterations in 80 patients (10%) for the baseline audit vs 3 alterations from 72 patients (4.2%) in the second audit (p = 0.17). A trend towards a reduction in alterations following peer review was observed. There has, however, been a change in practice resulting in a reduction in variation in CTV definition within our centre and greater adherence to protocols. There is increasing confidence in the quality and constancy of care delivered. Conclusion: Introduction of a weekly QA meeting for target volume definition has facilitated consensus and adoption of departmental clinical guidelines within the unit. Advances in knowledge: The weakest areas in radiotherapy are patient selection and definition of the CTV. Engagement in high-quality RTQA is paramount. This article describes the impact of this in one UK cancer centre. PMID:25251520

  11. The impact of adolescent females' assessments of parenthood and employment on plans for the future.

    Science.gov (United States)

    Leslie, L A

    1986-02-01

    This study explores adolescent females' assessments of the rewards and costs of employment and parenthood, and the impact of these assessments on their plans for organizing their adult lives. 549 young women enrolled in the 11th and 12 grades at public schools in New York City completed questionnaires addressing their future work and fertility plans, characteristics of their present family life, and their assessments of how rewarding and costly the roles of employee and parent would be to them. Results suggest that daughters of homemakers and daughters of employed women differ in their assessment of each role, and take different factors into consideration when making these assessments. In evaluating work, daughters whose mothers are employed were likely to depend on their mothers' experiences for guidance. On the other hand, daughters whose mothers are homemakers have to go through a more elaborate process of deduction. They appear to assess whether their mothers are happy where they are now and then project whether another role would be more satisfying. These young women also tend to incorporate the opinion of the father more than do daughters of employed mothers. In evaluating the impact of children, the young woman's relation with her own mother is a critical factor affecting both group' assessments of the costs of children as well as the employed group's assessments of the rewards of children. Finally, the limitations of the sample should be kept in mind when discussing the results. Though the sample was large numerically, the overall response rate was low. In addition, the sample consisted of a large number of Catholic respondents.

  12. Remediation planning and risk assessment support through data fusion technology

    International Nuclear Information System (INIS)

    1996-01-01

    Coleman Research's Data Fusion Modeling (DFM) services gives one the ability to use large geophysical and hydrological data sets, which include direct and indirect measurements, to obtain a unified mathematical model of the geology and hydrology at one's site. Coleman Research (CRC) has adapted highly stable and efficient statistical inversion techniques, developed over the past 20 years, to provide a 3D site model with quantified uncertainty based on state-of-the-art modeling codes. This site model supports risk assessment and remediation planning with enhanced numerical accuracy for tradeoff studies of alternate remediation strategies. Further, DFM supports real time model updates during remediation and site investigation

  13. The Assessment of a Tutoring Program to Meet CAS Standards Using a SWOT Analysis and Action Plan

    Science.gov (United States)

    Fullmer, Patricia

    2009-01-01

    This article summarizes the use of SWOT (Strengths, Weaknesses, Opportunities, and Threats) analysis and subsequent action planning as a tool of self-assessment to meet CAS (Council for the Advancement of Standards in Higher Education) requirements for systematic assessment. The use of the evaluation results to devise improvements to increase the…

  14. Molten Salt Reactor Experiment Facility (Building 7503) standards/requirements identification document adherence assessment plan at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-02-01

    This is the Phase 2 (adherence) assessment plan for the Building 7503 Molten Salt Reactor Experiment (MSRE) Facility standards/requirements identification document (S/RID). This document outlines the activities to be conducted from FY 1996 through FY 1998 to ensure that the standards and requirements identified in the MSRE S/RID are being implemented properly. This plan is required in accordance with the Department of Energy Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 90-2, November 9, 1994, Attachment 1A. This plan addresses the major aspects of the adherence assessment and will be consistent with Energy Systems procedure QA-2. 7 ''Surveillances.''

  15. Radioactive waste isolation in salt: peer review of the Office of Nuclear Waste Isolation's plans for repository performance assessment

    International Nuclear Information System (INIS)

    Harrison, W.

    1984-05-01

    In the peer review of the preliminary performance assessment plan, suggestions to improve the presentation are given, technical issues are addressed, a page-by-page commentary is included, and recommendations are summarized. In the peer review of the verification and validation plan, the following are addressed: suggestions to improve presentation; key activities that have been overlooked; improving the technical content of the plan; and degree to which code documents support the plan. Comments on other supporting code documents, page-by-page commentary, and summary of recommendations are included

  16. A state-of-practice survey of policy, plan, and program assessment in Canadian provinces

    International Nuclear Information System (INIS)

    Noble, Bram F.

    2004-01-01

    Since the introduction of the 1999 Canadian Cabinet Directive on the environmental assessment of policies, plans, and programs (PPPs), higher-order environmental assessment has been receiving increased attention in Canada. However, while practices and systems are advancing at the federal level, there has been very little attention given to recent developments in PPP assessment at the provincial level. This paper presents the results of a Canada-wide survey of PPP assessment principles and practices in 10 Canadian provincial EA jurisdictions. The findings indicate that there exists considerable variability in the provisions for and practice of PPP assessment amongst Canadian provinces, with only Saskatchewan, Ontario, and Quebec identifying recent practice experience. Included amongst the main barriers to effective implementation at the provincial level are the lack of legislative requirements for strategic EA, and the limited understanding of the nature and benefits of higher-order impact assessment

  17. Relation of Environmental Impact Assessment (EIA and Strategic Environmental Assessment (SEA and the Importance of Strategic Environmental Assessment in Landscape Planning Process

    Directory of Open Access Journals (Sweden)

    Gizem CENGİZ GÖKÇE

    2015-07-01

    Full Text Available The main goal in the countries which have not completed their development progress is industrialization and development just as soon as possible. Therefore, negative effects of industrialization and development on envi ronment and/or nature cannot be mostly discussed adequately. One of the planning approach instruments that targets sustainability, Environmental Impact Assessment (EIA is used in many countries effectively. But in recent years, that has understood; EIA is an impact assessment instrument that contains defensive preventions only on the basis of projects and this situation has caused some concerns against EIA. In this direction, Strategical Environmental Assessment (SEA exists as the final point of the instruments which are formed to provide sustainable development . In this study; the importance and the requirement of effectively taking a role of landscape architectures that have ecological based job, in the SEA workings which isn’t have got a legal status in Turkey yet, are emphasized by reviewing the relations between EIA and SEA concepts.

  18. The Study of Enhancing Plans on Korean Environmental Conservation Value Assessment Map (ECVAM)

    Science.gov (United States)

    Sung, M.; Choi, Y.; Hwang, J.; Jeon, S. W.

    2016-12-01

    With the limitation of land area in the Republic of Korea, land use and excessive development in Korea is one of the huge socio-environmental problems. Plethora of land owners, government, and enterprises to develop land cover are still struggling for maintaining balance between efficient land utilization and sufficient land conservation. For the feasible management and land use in the future, ECVAM(as known as Environmental Conservation Value Assessment Map) was created, accompanied with objective environmental grading of land in South Korea as well as integrated environmental information. ECVAM is the mapping system expressed by five-graded quality whether to develop or conserve in given land area with different colours. This map was primarily produced as the version 1.0 to ultimately use land eco-friendly and thoroughly which contains legally considered grade factors, environmental and ecological factors since 2001. From 2013, this project has planned to renovate the version 2.0 in more precise methods - strengthening legal support for user expansion, more amplified scale to 1:5,000, and the wide-spread supply such as education for those who demands ECVAM to adjust other fields like Environmental Impact Assessment to cope with land developers. For this year, we framed the official guideline to facilitate governments to design their newly-upgraded ECVAM but also to encourage local governors to utilize this figure for given land assessments. This assessment system also include the theoretical concept called natural asset valuation and the base study plan analyzing Vertical Vegetation Profile in the grading element of Stability of Community Structure. For the further study, it needs to reorganize the assessment factors to make the linkage between the ministry of environment and the ministry of land, infrastructure and transport in Korea for sustainable land use as well as to satisfy the grading ones in other nations' environmental conservation assessments such as

  19. Poster - 56: Preliminary comparison of FF- and FFF-VMAT for prostate plans with higher rectal dose

    International Nuclear Information System (INIS)

    Liu, Baochang; Darko, Johnson; Osei, Ernest

    2016-01-01

    Purpose: A recent retrospective study found 53 patients previously treated to 78Gy/39 using flattened filtered (FF) 6X-VMAT at GRRCC had rectal DVH more than one standard deviation higher than the average. This study was to investigate if using 6FFFor10FFF beams could reduce these DVHs without compromising target coverage. Methods: Twenty patients’ plans were re-planed with 2-arc 6X-VMAT, 6FFF-VMAT and 10FFF-VMAT using the Eclipse TPS following departmental protocol. All plans had the same optimization and normalization, and were evaluated against the acceptance criteria from the QUANTEC and Emami. Statistical differences in the mean dose to OARs (D m ) and PTV homogeneity index (HI) between energies were tested using the paired sample Wilcoxon signed rank statistical method (p<0.05). Beam delivery accuracy was checked on five patients using portal dosimetry (PD). Results: The PTV HI for the 10FFF shows no statistical difference from the 6X. All the OARs, except left femoral head with 6FFF, have significantly lower Dm using 6FFF and 10FFF .There is no difference in the maximum doses to rectum and bladder and are limited by the prescribed doses. Measurements show good agreements in the gamma evaluation (3%/3mm) for all energies. Conclusion: This preliminary study shows that doses to the OARs are reduced using 10FFF for the same target coverage. The plans using 6FFF result in lower doses to some OARs, and statistically different PTV HI. All plans showed very good agreement with measurements.

  20. Poster - 56: Preliminary comparison of FF- and FFF-VMAT for prostate plans with higher rectal dose

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Baochang; Darko, Johnson; Osei, Ernest [Grand River Regional Cancer Centre, Kitchener, Ontario (Canada)

    2016-08-15

    Purpose: A recent retrospective study found 53 patients previously treated to 78Gy/39 using flattened filtered (FF) 6X-VMAT at GRRCC had rectal DVH more than one standard deviation higher than the average. This study was to investigate if using 6FFFor10FFF beams could reduce these DVHs without compromising target coverage. Methods: Twenty patients’ plans were re-planed with 2-arc 6X-VMAT, 6FFF-VMAT and 10FFF-VMAT using the Eclipse TPS following departmental protocol. All plans had the same optimization and normalization, and were evaluated against the acceptance criteria from the QUANTEC and Emami. Statistical differences in the mean dose to OARs (D{sub m}) and PTV homogeneity index (HI) between energies were tested using the paired sample Wilcoxon signed rank statistical method (p<0.05). Beam delivery accuracy was checked on five patients using portal dosimetry (PD). Results: The PTV HI for the 10FFF shows no statistical difference from the 6X. All the OARs, except left femoral head with 6FFF, have significantly lower Dm using 6FFF and 10FFF .There is no difference in the maximum doses to rectum and bladder and are limited by the prescribed doses. Measurements show good agreements in the gamma evaluation (3%/3mm) for all energies. Conclusion: This preliminary study shows that doses to the OARs are reduced using 10FFF for the same target coverage. The plans using 6FFF result in lower doses to some OARs, and statistically different PTV HI. All plans showed very good agreement with measurements.

  1. Viešojo sektoriaus institucijų (departamentų) strateginio planavimo modeliai užsienio šalyse.

    OpenAIRE

    Arimavičiūtė, Malvina

    2013-01-01

    This article analyses the strategic plans of 10 departments of foreign countries using three approaches: by planning method, by content of the strategy, and by the context. Rational strategic planning method dominates the strategic plans of the departments and the models of process connections, in which strategic planning and implementation is based on the changes implemented by an institution, are not used very often. As to the strategic content, the main goals of departmental strategies are...

  2. The Inquiry Matrix: A Tool for Assessing and Planning Inquiry in Biology and Beyond

    Science.gov (United States)

    Grady, Julie

    2010-01-01

    One way to advance inquiry in the classroom is to establish a systematic strategy for reflecting on our practice and our students' readiness to engage in increasingly complex scientific reasoning. The Matrix for Assessing and Planning Scientific Inquiry (MAPSI) is a tool that promotes this valuable reflection so that we, as teachers, are better…

  3. 7 CFR 2700.3 - Functions.

    Science.gov (United States)

    2010-01-01

    ... the Department's long-range planning process for information resources. (e) Information Management... Regulations of the Department of Agriculture (Continued) OFFICE OF INFORMATION RESOURCES MANAGEMENT... direction for OIRM. Develops and recommends Departmental information resources management principles...

  4. 2011 FEMA Risk Mapping, Assessment, and Planning (Risk MAP) Lidar: Nashua River Watershed (Massachusetts, New Hampshire)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — These data are the lidar points collected for FEMA Risk Mapping, Assessment, and Planning (Risk MAP) for the Nashua River Watershed. This area falls in portions of...

  5. Assessment of I-125 seed implant accuracy when using the live-planning technique for low dose rate prostate brachytherapy

    Directory of Open Access Journals (Sweden)

    Moorrees Joshua

    2012-11-01

    Full Text Available Abstract Background Low risk prostate cancers are commonly treated with low dose rate (LDR brachytherapy involving I-125 seeds. The implementation of a ‘live-planning’ technique at the Royal Adelaide Hospital (RAH in 2007 enabled the completion of the whole procedure (i.e. scanning, planning and implant in one sitting. ‘Live-planning’ has the advantage of a more reliable delivery of the planned treatment compared to the ‘traditional pre-plan’ technique (where patient is scanned and planned in the weeks prior to implant. During live planning, the actual implanted needle positions are updated real-time on the treatment planning system and the dosimetry is automatically recalculated. The aim of this investigation was to assess the differences and clinical relevance between the planned dosimetry and the updated real-time implant dosimetry. Methods A number of 162 patients were included in this dosimetric study. A paired t-test was performed on the D90, V100, V150 and V200 target parameters and the differences between the planned and implanted dose distributions were analysed. Similarly, dosimetric differences for the organs at risk (OAR were also evaluated. Results Small differences between the primary dosimetric parameters for the target were found. Still, the incidence of hotspots was increased with approximately 20% for V200. Statistically significant increases were observed in the doses delivered to the OAR between the planned and implanted data; however, these increases were consistently below 3% thus probably without clinical consequences. Conclusions The current study assessed the accuracy of prostate implants with I-125 seeds when compared to initial plans. The results confirmed the precision of the implant technique which RAH has in place. Nevertheless, geographical misses, anatomical restrictions and needle displacements during implant can have repercussions for centres without live-planning option if dosimetric changes are not

  6. The use of an on-line computer system for radiotherapy planning. Part of a coordinated programme on computer applications in clinical dosimetry

    International Nuclear Information System (INIS)

    Tatcher, M.

    1977-07-01

    The aim of radiotherapy is to deliver a predetermined dose to the volume of a tumor in order to destroy it without at the same time harming healthy tissues nearby. The calculation of the dose distribution in a patient's body in order to determine the optimum arrangement of beam geometry is the central problem in treatment planning. For this task computers are increasingly being used as dose calculations by hand are time-consuming and exclude the application of modern treatment strategies. The objectives of this work were to set up a minimal departmental computer system for cobalt-60 radiotherapy treatment planning. Computer programmes were written for the following radiotherapy applications: Co-60 output charts (monthly charts of dose rate for determination of treatment time); interactive programme for calculating and optimizing isodose distributions to be used for treatment planning; calculation of irregular dose distributions of beams with arbitrary shape; gynecological radiotherapy, using internal Cs-137 and Ra-226 sources; linear isodose charts for 8 MV X-rays by interpolation from measured data. All programmes are written in BASIC. However, as BASIC does not link directly with the graphics devices, all programmes will be converted to FORTRAN, based on CUNNINGHAM's work. Although in principle the treatment planning programme in BASIC is satisfactory, it is not fast enough to replace manual calculations. Routine interactive computerized treatment planning will be possible once the FORTRAN programmes are operational. For all other routine purposes the BASIC radiotherapy programmes are suitable

  7. Strengthening Performance Management in the IAEA Department of Safeguards

    International Nuclear Information System (INIS)

    Villiers, V. Z. de

    2015-01-01

    This paper will describe an initiative to develop a management support tool to improve performance management in the IAEA Department of Safeguards. The envisaged mechanism should enable the Department to (a) plan, assess and report on the achievement of its objectives and (b) to improve its performance on a continuous basis. The performance management tool should be aligned with related processes in the Department and the IAEA as a whole such as strategic planning, programming and budget, the result-based management approach and various reporting mechanisms. It should be integrated with existing and planned information and other management systems. The initially, departmental working group that was established for this initiative focussed on two aspects: confirmation of the overall and specific objectives to be achieved by the Department of Safeguards, and compiling an inventory of indicators of activities, outputs and outcomes that were being used in the Department. This exercise confirmed that alignment and prioritization of activities relating to assessment of, and reporting on, performance could be improved. A value creation map was subsequently developed to assist in focussing the performance management tool to identified needs of stakeholders. Other activities of the working group included the determination of the desired characteristics of a hierarchy of performance indicators to be used to drive desired behaviour across organizational levels. Complexities to be handled included the following: · reflecting the appropriate component of the results chain (such as activities, outputs, outcomes and impact); · maintaining the linkages between objectives and performance indicators across organizational levels; · developing a balanced set of performance indicators (e.g. reflecting in-field and Headquarters activities, incorporating all main components of Departmental processes and balanced scorecard perspectives, measurable vs qualitative indicators); and

  8. A study to assess the effectiveness of planned exercise programme in patients with schizophrenia

    Directory of Open Access Journals (Sweden)

    Bineeta Nath

    2015-01-01

    Full Text Available Background: Psychotic disorders are some of the most severe, chronic, and intractable psychiatric disorders. Schizophrenia is a common and unsolved mental health problem in the world today. Negative symptoms are those symptoms that tend to reflect diminution or loss of normal functions like apathy, anhedonia, alogia, avolition, affective flattening, or social isolation. Exercise is useful for the reduction of some of the negative symptoms of schizophrenia, depression, and anxiety, and also to reduce auditory hallucinations and improve sleep patterns, self-esteem, and general behaviour in people living with schizophrenia. Aim of the study was to assess the effectiveness of planned exercise programme in negative symptoms among patients with schizophrenia. Methodology: A quasi experimental research design was used for this study. Total 60 samples were assigned into two groups with 30 in control group and 30 in experimental group. The data was collected by using structured socio-demographic proforma, Positive and Negative Syndrome Scale, and Scale for Assessment of Negative symptoms. Result: There was a statistically significant difference in pre and post test scores in both control and experimental groups. But statistically significant difference in post test mean scores on negative symptoms between control and experimental groups indicated effectiveness of planned exercise programme along with medical and nursing care. Conclusion: The findings concluded that planned exercise programme with routine medical and nursing care was effective in reduction of negative symptoms in schizophrenia patients.

  9. Predicting Teachers' Intentions to Implement School-Based Assessment Using the Theory of Planned Behaviour

    Science.gov (United States)

    Yan, Zi

    2014-01-01

    The theory of planned behaviour (TPB) was used to explore the Hong Kong teachers' intentions to implement school-based assessment (SBA) and the predictors of those intentions. A total of 280 teachers from Hong Kong secondary schools who had been involved in SBA were surveyed. Rasch-calibrated teacher measures were calculated for each of the 6…

  10. ArcFuels: an ArcMap toolbar for fuel treatment planning and wildfire risk assessment

    Science.gov (United States)

    Nicole M. Vaillant; Alan A. Ager

    2014-01-01

    Fire behavior modeling and geospatial analysis can provide tremendous insight to land managers in defining both the benefits and potential impacts of fuel treatments in the context of land management goals and public expectations. ArcFuels is a streamlined fuel management planning and wildfire risk assessment system that creates a trans-scale (stand to large landscape...

  11. Living the Plan: Strategic Planning Aligned with Practice and Assessment

    Science.gov (United States)

    Sullivan, Timothy M.; Richardson, Emily C.

    2011-01-01

    The purpose of this article is to provide leaders of continuing education enterprises with an integrated model for sustaining strategic planning initiatives. Global economic conditions, shifting competitive forces, continuing calls for accountability, and dramatic changes in institutional funding streams contribute to an environment characterized…

  12. maintainability of manpower system with restricted recruitment

    African Journals Online (AJOL)

    JERRY

    departmentalized manpower systems. ... homogenous k × k probability transition matrix of the manpower system; r and w be 1 .... is an advantage in manpower planning, especially in the area of manpower control, Bartholomew, et al (1991).

  13. Fraser Valley System Reinforcement Project: Environmental planning and assessment report

    International Nuclear Information System (INIS)

    1991-06-01

    Transmission facilities in the south central Fraser Valley, British Columbia, need reinforcement in order to meet anticipated growth in power demand. This objective could be met by reinforcing substation facilities (adding 500-kV equipment and connection to transmission line 5L41) at the McLellan Substation in Surrey, at the Clayburn Substation in Matsqui, or at the Atchelitz Substation in Chilliwack. An assessment is provided of the environmental evaluation criteria applied to these potential sites for substation reinforcement and the rationale for selection of the Clayburn site as the environmentally most effective alternative. The Clayburn site is already cleared and managed for a 230-kV substation; environmental, land use, and socioeconomic impacts are considered manageable. The existing right-of-way for the 500-kV loop in to the substation can be utilized. In addition, the results of an environmental assessment and mitigation plan for the Clayburn substation reinforcement are described. The most significant factors that will require possible mitigative measures include fisheries, water quality, floodplain management, visual and recreational aspects, and heritage resources. 16 figs., 5 tabs

  14. New model of enterprises resource planning implementation planning process in manufacturing enterprises

    Directory of Open Access Journals (Sweden)

    Mirjana Misita

    2016-05-01

    Full Text Available This article presents new model of enterprises resource planning implementation planning process in manufacturing enterprises based on assessment of risk sources. This assessment was performed by applying analytic hierarchy process. Analytic hierarchy process method allows variation of relative importance of specific risk sources dependent on the section from which the risk source originates (organizational environment, technical issues, people issues, adoption process management, and external support. Survey was conducted on 85 manufacturing enterprises involved with an enterprises resource planning solution. Ranking of risk sources assessments returns most frequent risks of enterprises resource planning implementation success in manufacturing enterprises, and representative factors were isolated through factor analysis by risk source origin. Finally, results indicate that there are hidden causes of failed implementation, for example, risk source “top management training and education,” from risk origin “adoption process management.”

  15. Assessment of Soil Protection to Support Forest Planning: an Experience in Southern Italy

    Directory of Open Access Journals (Sweden)

    Fabrizio Ferretti

    2014-04-01

    Full Text Available Aim of study: to support landscape planning when soil-erosion control and water cycle regulation represent relevant issues for forest management. A methodological approach - based on simplified index – is proposed in order to assess the protective efficacy of forests on soils (indirect protection. This method is aimed at supporting technicians who are requested to define the most suitable management guidelines and silvicultural treatments.Area of study: Southern Apennines (Alto Agri district – Basilicata Region - Italy, where a landscape planning experimentation was implemented. Material and Methods: The data to estimate the parameters used for the simplified index calculation are retrieved from a non aligned systematic forest inventory. The method considers: 1 the tendency towards instability, 2 the protective action of forest cover and 3 different silvicultural options.Main results: For the analysed forest categories, the results indicate the situations in which hydrogeological hazard is high. The cross-reading of these data with the values based on years of partial and total uncovering of the ground according to different silvicultural options (for each forest category in the reference period of 100 years has supported the definition of silviculture treatments and management options suitable for the considered forest formations.Research highlights: The proposed method can effectively support technicians in the field by highlighting situations of major hazard risk. Thanks to the joined assessment of different silvicultural options for each forest category, a series of silvicultural treatments, capable of better protecting the soil, can be already defined in the field survey phase.Key words: Alto Agri district (Italy; Forest Landscape Management Planning (FLMP; management; silvicultural treatment; protective function and soil erosion.

  16. Assessment of Soil Protection to Support Forest Planning: an Experience in Southern Italy

    Energy Technology Data Exchange (ETDEWEB)

    Ferreti, F.; Cantiani, P.; Meo, I. de; Paletto, A.

    2014-06-01

    Aim of study: To support landscape planning when soil-erosion control and water cycle regulation represent relevant issues for forest management. A methodological approach -based on simplified index- is proposed in order to assess the protective efficacy of forests on soils (indirect protection). This method is aimed at supporting technicians who are requested to define the most suitable management guidelines and silviculture treatments. Area of study: Southern Apennines (Alto Agri district -Basilicata Region- Italy), where a landscape planning experimentation was implemented. Material and methods: The data to estimate the parameters used for the simplified index calculation are retrieved from a non aligned systematic forest inventory. The method considers: 1) the tendency towards instability, 2) the protective action of forest cover and 3) different silviculture options. Main results: For the analysed forest categories, the results indicate the situations in which hydrogeological hazard is high. The cross-reading of these data with the values based on years of partial and total uncovering of the ground according to different silviculture options (for each forest category in the reference period of 100 years) has supported the definition of silviculture treatments and management options suitable for the considered forest formations. Research highlights The proposed method can effectively support technicians in the field by highlighting situations of major hazard risk. Thanks to the joined assessment of different silviculture options for each forest category, a series of silviculture treatments, capable of better protecting the soil, can be already defined in the field survey phase. Key words: Alto Agri district (Italy); Forest Landscape Management Planning (FLMP); management; silviculture treatment; protective function e soil erosion. (Author)

  17. Purdue Extended Campus: Transparency, Accountability, and Assessment in Strategic Planning

    Science.gov (United States)

    Cunningham, Robin; Eddy, Michael; Pagano, Mark; Ncube, Lisa

    2011-01-01

    In 2002 President Martin Jischke initiated a new era in strategic planning at Purdue. Under his leadership, strategic planning became a centralized activity with unit plans aligned to the university plan. Strategic goals were designed to have maximum impact, which would be measurable through metrics. Strategic planning at Purdue would be an…

  18. Hospital evacuation; planning, assessment, performance and evaluation

    OpenAIRE

    Nero C Wabo; P Örtenwall; A Khorram-Manesh

    2012-01-01

    Objective: Malfunction in hospitals' complex internal systems, or extern threats, may result in a hospital evacuation. Factors contributing to such evacuation must be identified, analyzed and action plans should be prepared. Our aims in this study were 1) to evaluate the use of risk and vulnerability analysis as a basis for hospital evacuation plan, 2) to identify risks/hazards triggering an evacuation and evaluate the respond needed and 3) to propose a template with main key points for plann...

  19. SU-E-T-310: Targeting Safety Improvements Through Analysis of Near-Miss Error Detection Points in An Incident Learning Database

    International Nuclear Information System (INIS)

    Novak, A; Nyflot, M; Sponseller, P; Howard, J; Logan, W; Holland, L; Jordan, L; Carlson, J; Ermoian, R; Kane, G; Ford, E; Zeng, J

    2014-01-01

    Purpose: Radiation treatment planning involves a complex workflow that can make safety improvement efforts challenging. This study utilizes an incident reporting system to identify detection points of near-miss errors, in order to guide our departmental safety improvement efforts. Previous studies have examined where errors arise, but not where they are detected or their patterns. Methods: 1377 incidents were analyzed from a departmental nearmiss error reporting system from 3/2012–10/2013. All incidents were prospectively reviewed weekly by a multi-disciplinary team, and assigned a near-miss severity score ranging from 0–4 reflecting potential harm (no harm to critical). A 98-step consensus workflow was used to determine origination and detection points of near-miss errors, categorized into 7 major steps (patient assessment/orders, simulation, contouring/treatment planning, pre-treatment plan checks, therapist/on-treatment review, post-treatment checks, and equipment issues). Categories were compared using ANOVA. Results: In the 7-step workflow, 23% of near-miss errors were detected within the same step in the workflow, while an additional 37% were detected by the next step in the workflow, and 23% were detected two steps downstream. Errors detected further from origination were more severe (p<.001; Figure 1). The most common source of near-miss errors was treatment planning/contouring, with 476 near misses (35%). Of those 476, only 72(15%) were found before leaving treatment planning, 213(45%) were found at physics plan checks, and 191(40%) were caught at the therapist pre-treatment chart review or on portal imaging. Errors that passed through physics plan checks and were detected by therapists were more severe than other errors originating in contouring/treatment planning (1.81 vs 1.33, p<0.001). Conclusion: Errors caught by radiation treatment therapists tend to be more severe than errors caught earlier in the workflow, highlighting the importance of safety

  20. Landscape planning as a contribution to the assessment and finding of sites for energy facilities from an ecological and creative point of view

    International Nuclear Information System (INIS)

    Buchwald, K.

    1977-01-01

    The environmental agreeability examination through landscape planning in connection with the finding of sites for power stations and their integration into area planning is explained. The procedure of landscape planning for the assessment of power station sites is also presented. (RW) [de

  1. The thematic plant life assessment network (PLAN)

    Energy Technology Data Exchange (ETDEWEB)

    Hurst, R C; McGarry, D [EC/JRC Institute for Advanced Materials, Petten (Netherlands); Pedersen, H H [Brite Euram DG XII, Brussels (Belgium)

    1999-12-31

    The Plant Life Assessment Network (PLAN) is a Brite Euram Type II Thematic Network, initiated by the European Commission to facilitate structured co-operation between all cost shared action projects already funded by the Commission which fall under this common technical theme. The projects involved address a multiplicity of problems associated with plant life assessment and are drawn from Brite-Euram, Standards, Measurement and Testing, Nuclear Fission Safety and Esprit EC programmes. The main aim of the Network is to initiate, maintain and monitor a fruitful co-operation process between completed, ongoing and future EC R and D projects, thereby promoting improved cross fertilization and enhanced industrial exploitation of R and D results. As the project is in its infancy, this presentation covers the background to the initiative in some detail. In particular two key aspects are highlighted, namely, the requirement of the EC to launch such a network in the area of plant life assessment including its evolution from two small Thematic Research Actions and, secondly, the mechanism for structuring the Network in an ordered and proven way along the lines of the EC/JRC European Networks, PISC, NESC, AMES, ENIQ, ENAIS and EPERC. The operating and financial structure of the Network is detailed with reference made to the role of the executive Steering Committee, The Network Project Leader and the Network Financial Co-ordinator. Each of the 58 projects involved in the Network, representing a wide range of industrial sectors and disciplines, is distributed in terms of their efforts between 4 disciplinary Clusters covering Inspection, Instrumentation and Monitoring, Structural Mechanics and Maintenance. For each of these Clusters, an expert has been appointed as a Project Technical Auditor to support the elected Cluster Co-ordinator to define Cluster Tasks, which contribute to the overall objectives of the project. From the Project Representatives, Cluster Task Leaders and

  2. The thematic plant life assessment network (PLAN)

    Energy Technology Data Exchange (ETDEWEB)

    Hurst, R.C.; McGarry, D. [EC/JRC Institute for Advanced Materials, Petten (Netherlands); Pedersen, H.H. [Brite Euram DG XII, Brussels (Belgium)

    1998-12-31

    The Plant Life Assessment Network (PLAN) is a Brite Euram Type II Thematic Network, initiated by the European Commission to facilitate structured co-operation between all cost shared action projects already funded by the Commission which fall under this common technical theme. The projects involved address a multiplicity of problems associated with plant life assessment and are drawn from Brite-Euram, Standards, Measurement and Testing, Nuclear Fission Safety and Esprit EC programmes. The main aim of the Network is to initiate, maintain and monitor a fruitful co-operation process between completed, ongoing and future EC R and D projects, thereby promoting improved cross fertilization and enhanced industrial exploitation of R and D results. As the project is in its infancy, this presentation covers the background to the initiative in some detail. In particular two key aspects are highlighted, namely, the requirement of the EC to launch such a network in the area of plant life assessment including its evolution from two small Thematic Research Actions and, secondly, the mechanism for structuring the Network in an ordered and proven way along the lines of the EC/JRC European Networks, PISC, NESC, AMES, ENIQ, ENAIS and EPERC. The operating and financial structure of the Network is detailed with reference made to the role of the executive Steering Committee, The Network Project Leader and the Network Financial Co-ordinator. Each of the 58 projects involved in the Network, representing a wide range of industrial sectors and disciplines, is distributed in terms of their efforts between 4 disciplinary Clusters covering Inspection, Instrumentation and Monitoring, Structural Mechanics and Maintenance. For each of these Clusters, an expert has been appointed as a Project Technical Auditor to support the elected Cluster Co-ordinator to define Cluster Tasks, which contribute to the overall objectives of the project. From the Project Representatives, Cluster Task Leaders and

  3. 46200 Planning and Development of Wind Farms: Wind resource assessment using the WAsP software

    DEFF Research Database (Denmark)

    Mortensen, Niels Gylling

    These course notes are intended for the three-week course 46200 Planning and Development of Wind Farms given each year at the Technical University of Denmark. The purpose of the course notes is to give an introduction to wind resource assessment and siting issues using the WAsP suite of programs....

  4. Salton Sea ecosystem monitoring and assessment plan

    Science.gov (United States)

    Case(compiler), H. L.; Boles, Jerry; Delgado, Arturo; Nguyen, Thang; Osugi, Doug; Barnum, Douglas A.; Decker, Drew; Steinberg, Steven; Steinberg, Sheila; Keene, Charles; White, Kristina; Lupo, Tom; Gen, Sheldon; Baerenklau, Ken A.

    2013-01-01

    The Salton Sea, California’s largest lake, provides essential habitat for several fish and wildlife species and is an important cultural and recreational resource. It has no outlet, and dissolved salts contained in the inflows concentrate in the Salton Sea through evaporation. The salinity of the Salton Sea, which is currently nearly one and a half times the salinity of ocean water, has been increasing as a result of evaporative processes and low freshwater inputs. Further reductions in inflows from water conservation, recycling, and transfers will lower the level of the Salton Sea and accelerate the rate of salinity increases, reduce the suitability of fish and wildlife habitat, and affect air quality by exposing lakebed playa that could generate dust. Legislation enacted in 2003 to implement the Quantification Settlement Agreement (QSA) stated the Legislature’s intent for the State of California to undertake the restoration of the Salton Sea ecosystem. As required by the legislation, the California Resources Agency (now California Natural Resources Agency) produced the Salton Sea Ecosystem Restoration Study and final Programmatic Environmental Impact Report (PEIR; California Resources Agency, 2007) with the stated purpose to “develop a preferred alternative by exploring alternative ways to restore important ecological functions of the Salton Sea that have existed for about 100 years.” A decision regarding a preferred alternative currently resides with the California State Legislature (Legislature), which has yet to take action. As part of efforts to identify an ecosystem restoration program for the Salton Sea, and in anticipation of direction from the Legislature, the California Department of Water Resources (DWR), California Department of Fish and Wildlife (CDFW), U.S. Bureau of Reclamation (Reclamation), and U.S. Geological Survey (USGS) established a team to develop a monitoring and assessment plan (MAP). This plan is the product of that effort. The

  5. GPS adjacent-band compatibility assessment plan.

    Science.gov (United States)

    2012-12-01

    The Federal Aviation Administration (FAA) and the Research and Innovative Technology : Administration (RITA), both operating Administrations of the DOT, developed this Plan to : provide the framework for definition of the processes and assumptions th...

  6. Who plans for health improvement? SEA, HIA and the separation of spatial planning and health planning

    International Nuclear Information System (INIS)

    Bond, Alan; Cave, Ben; Ballantyne, Rob

    2013-01-01

    This study examines whether there is active planning for health improvement in the English spatial planning system and how this varies across two regions using a combination of telephone surveys and focus group interviews in 2005 and 2010. The spatial planning profession was found to be ill-equipped to consider the health and well-being implications of its actions, whilst health professionals are rarely engaged and have limited understanding and aspirations when it comes to influencing spatial planning. Strategic Environmental Assessment was not considered to be successful in integrating health into spatial plans, given it was the responsibility of planners lacking the capacity to do so. For their part, health professionals have insufficient knowledge and understanding of planning and how to engage with it to be able to plan for health gains rather than simply respond to health impacts. HIA practice is patchy and generally undertaken by health professionals outside the statutory planning framework. Thus, whilst appropriate assessment tools exist, they currently lack a coherent context within which they can function effectively and the implementation of the Kiev protocol requiring the engagement of health professionals in SEA is not to likely improve the consideration of health in planning while there continues to be separation of functions between professions and lack of understanding of the other profession. -- Highlights: ► Health professionals have limited aspirations for health improvement through the planning system. ► Spatial planners are ill-equipped to understand the health and well-being implications of their activities. ► SEA and HIA currently do not embed health consideration in planning decisions. ► The separation of health and planning functions is problematic for the effective conduct of SEA and/or HIA

  7. Who plans for health improvement? SEA, HIA and the separation of spatial planning and health planning

    Energy Technology Data Exchange (ETDEWEB)

    Bond, Alan, E-mail: alan.bond@uea.ac.uk [InteREAM (Interdisciplinary Research in Environmental Assessment and Management), School of Environmental Sciences, University of East Anglia, Norwich, NR4 7TJ (United Kingdom); Cave, Ben, E-mail: ben.cave@bcahealth.co.uk [Ben Cave Associates Ltd., Leeds (United Kingdom); Ballantyne, Rob, E-mail: robdballantyne@gmail.com [Planning and Health Consultant, Oxfordshire (United Kingdom)

    2013-09-15

    This study examines whether there is active planning for health improvement in the English spatial planning system and how this varies across two regions using a combination of telephone surveys and focus group interviews in 2005 and 2010. The spatial planning profession was found to be ill-equipped to consider the health and well-being implications of its actions, whilst health professionals are rarely engaged and have limited understanding and aspirations when it comes to influencing spatial planning. Strategic Environmental Assessment was not considered to be successful in integrating health into spatial plans, given it was the responsibility of planners lacking the capacity to do so. For their part, health professionals have insufficient knowledge and understanding of planning and how to engage with it to be able to plan for health gains rather than simply respond to health impacts. HIA practice is patchy and generally undertaken by health professionals outside the statutory planning framework. Thus, whilst appropriate assessment tools exist, they currently lack a coherent context within which they can function effectively and the implementation of the Kiev protocol requiring the engagement of health professionals in SEA is not to likely improve the consideration of health in planning while there continues to be separation of functions between professions and lack of understanding of the other profession. -- Highlights: ► Health professionals have limited aspirations for health improvement through the planning system. ► Spatial planners are ill-equipped to understand the health and well-being implications of their activities. ► SEA and HIA currently do not embed health consideration in planning decisions. ► The separation of health and planning functions is problematic for the effective conduct of SEA and/or HIA.

  8. A simple, generalizable method for measuring individual research productivity and its use in the long-term analysis of departmental performance, including between-country comparisons.

    Science.gov (United States)

    Wootton, Richard

    2013-01-14

    A simple, generalizable method for measuring research output would be useful in attempts to build research capacity, and in other contexts. A simple indicator of individual research output was developed, based on grant income, publications and numbers of PhD students supervised. The feasibility and utility of the indicator was examined by using it to calculate research output from two similarly-sized research groups in different countries. The same indicator can be used to assess the balance in the research "portfolio" of an individual researcher. Research output scores of 41 staff in Research Department A had a wide range, from zero to 8; the distribution of these scores was highly skewed. Only about 20% of the researchers had well-balanced research outputs, with approximately equal contributions from grants, papers and supervision. Over a five-year period, Department A's total research output rose, while the number of research staff decreased slightly, in other words research productivity (output per head) rose. Total research output from Research Department B, of approximately the same size as A, was similar, but slightly higher than Department A. The proposed indicator is feasible. The output score is dimensionless and can be used for comparisons within and between countries. Modeling can be used to explore the effect on research output of changing the size and composition of a research department. A sensitivity analysis shows that small increases in individual productivity result in relatively greater increases in overall departmental research output. The indicator appears to be potentially useful for capacity building, once the initial step of research priority setting has been completed.

  9. Why do employees take more initiatives to improve their performance after co-developing performance measures? A field study

    NARCIS (Netherlands)

    Groen, B.A.C.; Wouters, M.J.F.; Wilderom, C.P.M.

    2012-01-01

    Performance measurements may stimulate employee initiatives to improve operational performance, especially when employees themselves participate in the development of their own departmental performance measures. Using the theory of planned behavior, we examine why this occurs in a beverage

  10. Why do employees take more initiatives to improve their performance after co-developing performance measures? A field study.

    NARCIS (Netherlands)

    Groen, B.A.C.; Wouters, Marc; Wilderom, Celeste P.M.

    2012-01-01

    Performance measurements may stimulate employee initiatives to improve operational performance, especially when employees themselves participate in the development of their own departmental performance measures. Using the theory of planned behavior, we examine why this occurs in a beverage

  11. Participatory Multi-Criteria Assessment of Forest Planning Policies in Conflicting Situations: The Case of Tenerife

    Directory of Open Access Journals (Sweden)

    Montserrat Acosta

    2015-11-01

    Full Text Available Sustainable forest planning should involve the participation of stakeholder communities in the decision-making process. This participation can help avoid the possible rejection of new planning measures. In this paper, the decision-making process to implement regulations on the use of forest tracks on the island of Tenerife (Canary Islands, Spain is analyzed. In recent years, the number of people using the island’s forest environments has notably increased, leading to conflicts between different users of the tracks; as a result, the Island Council of Tenerife is working on regulating these pathways. This paper describes the framing analysis, design, and implementation of a participatory multi-criteria approach to explore, together with stakeholders, the best policy alternatives related to forest planning and management issues of forest track use. To do this, a set of tools has been developed, consisting of institutional analysis, participatory methods, and multi-criteria assessment techniques.

  12. Internal Audit of a Comprehensive IMRT Program for Prostate Cancer: A Model for Centers in Developing Countries?

    International Nuclear Information System (INIS)

    Koh, Wee Yao; Ren Wei; Mukherjee, Rahul K.; Chung, Hans T.

    2009-01-01

    Purpose: With improving regional prosperity, significant capital investments have been made to rapidly expand radiotherapy capacity across Southeast Asia. Yet little has been reported on the implementation of adequate quality assurance (QA) in patient management. The objective of this study is to perform an in-depth QA assessment of our definitive intensity-modulated radiotherapy (IMRT) program for prostate cancer since its inception. Methods and Materials: The department's prostate IMRT program was modeled after that of University of California San Francisco. A departmental protocol consisting of radiotherapy volume/dose and hormone sequencing/duration and a set of 18 dose objectives to the target and critical organs were developed, and all plans were presented at the weekly departmental QA rounds. All patients treated with definitive IMRT for nonmetastatic prostate cancer were retrospectively reviewed. Protocol adherence, dosimetry data, toxicities, and outcomes were evaluated. Results: Since 2005, 76 patients received IMRT: 54 with whole-pelvis and 22 with prostate-only treatment. Of the 1,140 recorded dosimetric end points, 39 (3.3%) did not meet the protocol criteria. At QA rounds, no plans required a revision. Only one major protocol violation was observed. Two and two cases of Grade 3-4 acute and late toxicities, respectively, were observed. Five (8.8%) patients developed proctitis, but only one required argon laser therapy. Conclusions: Our comprehensive, practice-adapted QA measures appeared to ensure that we were able to consistently generate conforming IMRT plans with acceptable toxicities. These measures can be easily integrated into other clinics contemplating on developing such a program.

  13. Evaluation of the probabilistic safety assessment portfolio for NSD. Plan of work

    International Nuclear Information System (INIS)

    Gould, J.

    1999-01-01

    The aim is to use the research portfolio evaluation protocol developed by HSL to evaluate the Probabilistic Safety Assessment (PSA) portfolio, both to draw conclusions about the PSA portfolio and as a pilot study to show the suitability of the evaluation protocol. The objectives of the work are: (1) To collect sufficient information to carry out a preliminary review of the portfolio; (2) o produce a plan of work detailing the time and costs to carry out a full evaluation of the PSA portfolio; (3) to evaluate the PSA portfolio of research; (4) to produce a report of the evaluation of the PSA portfolio; (5) if necessary, to make changes to the methodology in light of the experience gained in the evaluation of the PSA research portfolio. This report completes objectives 1 and 2. It details the plan of work for the evaluation of the PSA research portfolio. The plan has shown that the evaluation of the PSA research portfolio has many difficulties to overcome. It is suitable as a pilot study to show the suitability of the portfolio evaluation protocol and will provide valuable information that can be used to improve it. The evaluation of the PSA portfolio will require a considerable amount of time and effort to complete. The task analysis has shown it to be of the order of Pound Sterling 25k and to take two months to complete after this preliminary data collection. The plan to evaluate the PSA research portfolio detailed in this report should be carried out and the lessons learned by carrying out this pilot study should be used to improve the evaluation protocol

  14. 43 CFR 46.210 - Listing of Departmental categorical exclusions.

    Science.gov (United States)

    2010-10-01

    ... business, including such things as supervision, administration, operations, maintenance, renovations, and... at all levels. (This does not exclude the preparation of environmental documents for proposals... Environment 10-Year Comprehensive Strategy Implementation Plan;” (3) Shall be conducted consistent with bureau...

  15. Embedding Systems Thinking into EWB Project Planning and Development: Assessing the Utility of a Group Model Building Approach

    Directory of Open Access Journals (Sweden)

    Kimberly Pugel

    2017-11-01

    Full Text Available Amongst growing sociotechnical efforts, engineering students and professionals both in the international development sector and industry are challenged to approach projects more holistically to achieve project goals.  Engineering service learning organizations must similarly adapt their technological projects to consider varying cultural and economic structures, ensuring more resilient social progress within development efforts.  In practice, systems thinking approaches can be utilized to model the social, economic, political, and technological implications that influence the sustainability of an engineering project. This research assesses the utility of integrating systems thinking into Engineers Without Borders (EWB project planning and development, thereby improving project impact and more effectively engaging members.  At a workshop held at an EWB-USA 2016 Regional Conference, the authors presented a planning and evaluation framework that applies group model building with system dynamics to foster systems thinking through factor diagramming and analysis. To assess the added value of the framework for EWB project planning and development, extensive participant feedback was gathered and evaluated during the workshop and through an optional post-workshop survey.  Supported by thoughtful observations and feedback provided by the EWB members, the model building workshop appeared to help participants reveal and consider project complexities by both visually and quantitatively identifying key non-technical and technical factors that influence project sustainability.  Therefore, system dynamics applied in a group model building workshop offers a powerful supplement to traditional EWB project planning and assessment activities, providing a systems-based tool for EWB teams and partner communities to build capacity and create lasting change.

  16. Remediation plans in family medicine residency

    Science.gov (United States)

    Audétat, Marie-Claude; Voirol, Christian; Béland, Normand; Fernandez, Nicolas; Sanche, Gilbert

    2015-01-01

    Abstract Objective To assess use of the remediation instrument that has been implemented in training sites at the University of Montreal in Quebec to support faculty in diagnosing and remediating resident academic difficulties, to examine whether and how this particular remediation instrument improves the remediation process, and to determine its effects on the residents’ subsequent rotation assessments. Design A multimethods approach in which data were collected from different sources: remediation plans developed by faculty, program statistics for the corresponding academic years, and students’ academic records and rotation assessment results. Setting Family medicine residency program at the University of Montreal. Participants Family medicine residents in academic difficulty. Main outcome measures Assessment of the content, process, and quality of remediation plans, and students’ academic and rotation assessment results (successful, below expectations, or failure) both before and after the remediation period. Results The framework that was developed for assessing remediation plans was used to analyze 23 plans produced by 10 teaching sites for 21 residents. All plans documented cognitive problems and implemented numerous remediation measures. Although only 48% of the plans were of good quality, implementation of a remediation plan was positively associated with the resident’s success in rotations following the remediation period. Conclusion The use of remediation plans is well embedded in training sites at the University of Montreal. The residents’ difficulties were mainly cognitive in nature, but this generally related to deficits in clinical reasoning rather than knowledge gaps. The reflection and analysis required to produce a remediation plan helps to correct many academic difficulties and normalize the academic career of most residents in difficulty. Further effort is still needed to improve the quality of plans and to support teachers.

  17. The risks of liability for former mine operators: the implementation of a plan for preventing legal risks

    International Nuclear Information System (INIS)

    Martinet, Y.

    2004-01-01

    Shutting down mines has 'mechanically' increased the risks of cave-ins. The local (communal and/or departmental) administrations responsible for supervising the situation do not necessarily have the means for managing shafts and tunnels. For this reason, two acts were passed in 1994 and 1999 to reform how mines are managed after shutdowns. Managing post-mining operations has spawned lawsuits against former operators, even though they shut down their mines in compliance with the laws and regulations in force at the time. By virtue of these two acts, administrative authorities are now trying to make the former operators fill in shafts and tunnels. Moreover, individuals often try to obtain compensation for the damages caused by shut-down mines. This situation causes uncertainty for various parties; and the legal settlements being proposed are not sufficiently clear. Information is provided for thinking about how to implement a 'legal risk prevention plan', which former mine operators should bear in mind. (author)

  18. Watershed planning, implementation and assessment: the May River Watershed Action Plan case study

    Science.gov (United States)

    Kimberly W. Jones; Christopher L. Ellis; Jeremy S. Ritchie

    2016-01-01

    Prior to exponential growth in the early to mid-2000s, the Town of Bluffton, SC was one square mile; as of 2015, it is approximately 55 square miles. Associated with this growth was a shellfish harvesting closure for nearly onethird of the May River in 2009. The Town and its partners developed and began to implement the May River Watershed Action Plan in 2011. The plan...

  19. 75 FR 22737 - Final Damage Assessment and Restoration Plan for the Bayou Verdine and Calcasieu River

    Science.gov (United States)

    2010-04-30

    ..., and Liability Act (CERCLA), 42 U.S.C. 9607(f), Section 311 of the Federal Water Pollution and Control... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Final Damage Assessment and Restoration Plan for the Bayou Verdine and Calcasieu River AGENCY: National Oceanic and Atmospheric...

  20. Supply chain planning with sustainability considerations: an integrative framework

    DEFF Research Database (Denmark)

    Wang, Yang; Akkerman, Renzo; Birkved, Morten

    2011-01-01

    This paper proposes a modelling framework for combining supply chain planning and sustainability assessment, illustrating how sustainability assessments of logistic activities can be improved by supply chain planning input, and supply chain planning can in turn make use of the results from sustai...... produced on industrial scale, studying several important planning decisions like temperature treatments and choice of packaging materials.......This paper proposes a modelling framework for combining supply chain planning and sustainability assessment, illustrating how sustainability assessments of logistic activities can be improved by supply chain planning input, and supply chain planning can in turn make use of the results from...

  1. Assessing Ecosystem Service Provision Under Climate Change to Support Conservation and Development Planning in Myanmar

    Science.gov (United States)

    Mandle, Lisa; Wolny, Stacie; Bhagabati, Nirmal; Helsingen, Hanna; Hamel, Perrine; Bartlett, Ryan; Dixon, Adam; Horton, Radley M.; Lesk, Corey; Manley, Danielle; hide

    2017-01-01

    Inclusion of ecosystem services (ES) information into national-scale development and climate adaptation planning has yet to become common practice, despite demand from decision makers. Identifying where ES originate and to whom the benefits flowunder current and future climate conditionsis especially critical in rapidly developing countries, where the risk of ES loss is high. Here, using Myanmar as a case study, we assess where and how ecosystems provide key benefits to the countrys people and infrastructure. We model the supply of and demand for sediment retention, dry-season baseflows, flood risk reduction and coastal storm protection from multiple beneficiaries. We find that locations currently providing the greatest amount of services are likely to remain important under the range of climate conditions considered, demonstrating their importance in planning for climate resilience. Overlap between priority areas for ES provision and biodiversity conservation is higher than expected by chance overall, but the areas important for multiple ES are underrepresented in currently designated protected areas and Key Biodiversity Areas. Our results are contributing to development planning in Myanmar, and our approach could be extended to other contexts where there is demand for national-scale natural capital information to shape development plans and policies

  2. Countywide Evaluation of the Long-Term Family Self-Sufficiency Plan. Assessing the Utility of the LTFSS Plan Service Delivery and Planning Framework

    National Research Council Canada - National Science Library

    Davis, Lois

    2002-01-01

    ...) is the lead agency responsible for implementing the evaluation of the LTFSS Plan. On December 5, 2000, the Board approved the implementation plan for the evaluation of the LTFSS Plan, LTFSS Project #46...

  3. 76 FR 17471 - Air Tour Management Plan Environmental Assessment for Mount Rainier National Park, WA; Public...

    Science.gov (United States)

    2011-03-29

    ... draft alternatives in the development of an Air Tour Management Plan (ATMP) for the Mount Rainier... Environmental Assessment (EA), an ATMP, and associated rulemaking actions which comply with the National...: http://parkplanning.nps.gov/MORA_ATMP or sent to the mailing addresses listed in the ``FOR FURTHER...

  4. Work plan for the Oak Ridge Reservation ecological monitoring and assessment program

    International Nuclear Information System (INIS)

    Ashwood, T.L.; Sample, B.E.; Suter, G.W. II; Turner, M.G.; Loar, J.M.; Barnthouse, L.W.

    1994-08-01

    This plan describes an approach for developing an ecological monitoring and assessment program (EMAP) for the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR). Such a program is required to assess existing ecological risks, to predict changes in those ecological risks from proposed remedial actions, and to monitor the effectiveness of remedial actions in reducing ecological risks. Ecological risk assessments must be based on Reservation-level data for those widespread or wide-ranging plant and animal species that occupy the entire ORR. In recognition of this need, Region 4 of the US Environmental Protection Agency has specifically requested that DOE develop a Reservation-wide monitoring and assessment program. The current strategy distinguishes four types of potentially contaminated areas: (1) source operable units (OUs), which may contain waste disposal areas, (2) groundwater aquifers that are potentially contaminated by source OUs, (3) aquatic integrator OUs which are streams and associated floodplains that drain source OUs, and (4) the terrestrial integrator, which encompasses the Reservation. Source OUs may contain sources of contamination that potentially impact local plant and animal population and communities that are restricted to the areal extent of the OU. Such local impacts must be assessed for each OU. However, these source OUs also contribute to risks within the aquatic OUs and within the Reservation-wide terrestrial ecosystem. Therefore, remedial investigations at source OUs must provide data necessary to support ecological risk assessments at the larger scales

  5. Planning and Resource Allocation Management.

    Science.gov (United States)

    Coleman, Jack W.

    1986-01-01

    Modern scientific management techniques provide college administrators with valuable planning and resource allocation insights and enhances the decision process. The planning model should incorporate assessment, strategic planning, dynamic and long-term budgeting, operational planning, and feedback and control for actual operations. (MSE)

  6. Planning Tool for Strategic Evaluation of Facility Plans - 13570

    Energy Technology Data Exchange (ETDEWEB)

    Magoulas, Virginia; Cercy, Michael [Savannah River National Laboratory, Savannah River Site, Aiken, SC 29808 (United States); Hall, Irin [Newport News Shipbuilding, 4101 Washington Ave., Newport News, VA 23607 (United States)

    2013-07-01

    Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility was needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)

  7. Planning Tool for Strategic Evaluation of Facility Plans - 13570

    International Nuclear Information System (INIS)

    Magoulas, Virginia; Cercy, Michael; Hall, Irin

    2013-01-01

    Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility was needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)

  8. ARAC: a centralized computer assisted emergency planning, response, and assessment system for atmospheric releases of toxic material

    International Nuclear Information System (INIS)

    Dickerson, M.H.; Knox, J.B.

    1986-10-01

    The Atmospheric Release Advisory Capability (ARAC) is an emergency planning, response, and assessment service, developed by the US Departments of Energy and Defense, and focused, thus far, on atmospheric releases of nuclear material. For the past 14 years ARAC has responded to over 150 accidents, potential accidents, and major exercises. The most notable accident responses are the COSMOS 954 reentry, the Three Mile Island (TMI-2) accident and subsequent purge of 85 Kr from the containment vessel, the recent UF 6 accident at the Kerr-McGee Plant, Gore, Oklahoma, and the Chernobyl nuclear reactor accident in the Soviet Union. Based on experience in the area of emergency response, developed during the past 14 years, this paper describes the cost effectiveness and other advantages of a centralized emergency planning, response, and assessment service for atmospheric releases of nuclear material

  9. ARAC: a centralized computer-assisted emergency planning, response, and assessment system for atmospheric releases of toxic material

    International Nuclear Information System (INIS)

    Dickerson, M.H.; Knox, J.B.

    1987-01-01

    The Atmospheric Release Advisory Capability (ARAC) is an emergency planning, response, and assessment service, developed by the US Departments of Energy and Defense, and focused, thus far, on atmospheric releases of nuclear material. For the past 14 years ARAC has responded to over 150 accidents, potential accidents, and major exercises. The most notable accident responses are the COSMOS 954 reentry, the Three Mile Island (TMI-2) accident and subsequent purge of 85 Kr from the containment vessel, the recent UF 6 accident at the Kerr-McGee Plant, Gore, Oklahoma, and the Chernobyl nuclear reactor accident in the Soviet Union. Based on experience in the area of emergency response, developed during the past 14 years, this paper describes the cost effectiveness and other advantages of a centralized emergency planning, response, and assessment service for atmospheric releases of nuclear material

  10. Groundwater vulnerability assessment to assist the measurement planning of the water framework directive - a practical approach with stakeholders

    Science.gov (United States)

    Berkhoff, K.

    2007-05-01

    An evaluation scheme is presented in this paper which can be used to assess groundwater vulnerability according to the requirements of the European Water Framework Directive (WFD). The evaluation scheme results in a groundwater vulnerability map identifying areas of high, medium and low vulnerability, as necessary for the measurement planning of the WFD. The evaluation scheme is based on the definition of the vulnerability of the Intergovernmental Panel on Climate Change (IPCC). It considers exposure, sensitivity and the adaptive capacity of the region. The adaptive capacity is evaluated in an actors' platform, which was constituted for the region in the PartizipA ("Participative modelling, Actor and Ecosystem Analysis in Regions with Intensive Agriculture") project. As a result of the vulnerability assessment, 21% of the catchment area was classified as being highly vulnerable, whereas 73% has medium vulnerability and 6% has low vulnerability. Thus, a groundwater vulnerability assessment approach is presented, which can be used in practice on a catchment scale for the WFD measurement planning.

  11. Monitor of spatial plans. Feasibility study

    International Nuclear Information System (INIS)

    Bollen, M.J.S.; Ritsema van Eck, J.; Farjon, J.M.J.

    2008-01-01

    The national government needs assessments of consequences of building projects in relation to spatial policy objectives such as the prevention of urban sprawl or the development of landscape qualities. Normally the effects of spatial policies appear after several years. Spatial plans can possibly indicate these effects earlier. To allow policies to be adapted to unwanted developments, the assessments should be available in the early planning stages of these building projects. The Dutch Minister of VROM has asked the Netherlands Environmental Assessment Agency to investigate the feasibility of a monitoring system based on building plans. As building projects take a long period from conception until realization, a monitoring system for these projects should include all plans for the next ten to fifteen years with an indication of the chance that these plans are realized. The existing databases in the Netherlands provide sufficient information to assess consequences of plans for those objectives that are directly related to the urbanization pattern. However, an improvement of these databases is necessary, amongst other things by coordination of these databases [nl

  12. Indicators for planning of health services: assessing impacts of social and health care factors on population health.

    Science.gov (United States)

    Wan, T T; Broida, J H

    1983-01-01

    Community health planning requires identification of the level of access to care and factors which affect the differentials in use of health services. In formulating strategies or alternatives for planning, some assessment of the current level or patterns of health services must be made. It is this element of the planning process that is addressed in this paper. In this study sixty-five specifically designated areas (medical market areas) in the Province of Quebec, Canada were selected. The analysis was performed using data obtained from a large scale study of physicians' responses to the introduction of universal medical care insurance in Quebec. Our analysis offered an opportunity to observe the impact of Medicare on access to care for those thought to be underserved.

  13. 12 CFR 563e.27 - Strategic plan.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Strategic plan. 563e.27 Section 563e.27 Banks... for Assessing Performance § 563e.27 Strategic plan. (a) Alternative election. The OTS will assess a... strategic plan if: (1) The savings association has submitted the plan to the OTS as provided for in this...

  14. Comprehensive development plans for the low- and intermediate-level radioactive waste disposal facility in Korea and preliminary safety assessment

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Kang Il; Kim, Jin Hyeong; Kwon, Mi Jin; Jeong, Mi Seon; Hong, Sung Wook; Park, Jin Beak [Korea Radioactive Waste Agency, Daejeon (Korea, Republic of)

    2016-12-15

    The disposal facility in Gyeongju is planning to dispose of 800,000 packages of low- and intermediate- level radioactive waste. This facility will be developed as a complex disposal facility that has various types of disposal facilities and accompanying management. In this study, based on the comprehensive development plan of the disposal facility, a preliminary post-closure safety assessment is performed to predict the phase development of the total capacity for the 800,000 packages to be disposed of at the site. The results for each scenario meet the performance target of the disposal facility. The assessment revealed that there is a significant impact of the inventory of intermediate-level radionuclide waste on the safety evaluation. Due to this finding, we introduce a disposal limit value for intermediate-level radioactive waste. With stepwise development of safety case, this development plan will increase the safety of disposal facilities by reducing uncertainties within the future development of the underground silo disposal facilities.

  15. Assessing the integration of health center and community emergency preparedness and response planning.

    Science.gov (United States)

    Wineman, Nicole V; Braun, Barbara I; Barbera, Joseph A; Loeb, Jerod M

    2007-11-01

    To assess the state of health center integration into community preparedness, we undertook a national study of linkages between health centers and the emergency preparedness and response planning initiatives in their communities. The key objectives of this project were to gain a better understanding of existing linkages in a nationally representative sample of health centers, and identify health center demographic and experience factors that were associated with strong linkages. The objectives of the study were to gain a baseline understanding of existing health center linkages to community emergency preparedness and response systems and to identify factors that were associated with strong linkages. A 60-item questionnaire was mailed to the population of health centers supported by the Health Resources and Services Administration's Bureau of Primary Health Care in February 2005. Results were aggregated and a chi square analysis identified factors associated with stronger linkages. Overall performance on study-defined indicators of strong linkages was low: 34% had completed a hazard vulnerability analysis in collaboration with the community emergency management agency, 30% had their role documented in the community plan, and 24% participated in community-wide exercises. Stronger linkages were associated with experience responding to a disaster and a perception of high risk for experiencing a disaster. The potential for health centers to participate in an integrated response is not fully realized, and their absence from community-based planning leaves an already vulnerable population at greater risk. Community planners should be encouraged to include health centers in planning and response and centers should receive more targeted resources for community integration.

  16. Applying Comprehensive Environmental Assessment to Research Planning for Multiwalled Carbon Nanotubes: Refinements to Inform Future Stakeholder Engagement

    Science.gov (United States)

    We previously described our collective judgment methods to engage expert stakeholders in the Comprehensive Environmental Assessment (CEA) workshop process applied to nano-TiO2 and nano-Ag research planning. We identified several lessons learned in engaging stakeholders to identif...

  17. Staff survey of organizational structure and process for a Public Health Department.

    Science.gov (United States)

    Dwyer, J J

    1995-01-01

    A survey of 227 North York Public Health Department (NYPHD) staff provided their perspective on the organizational structure. They perceived that (a) the departmental and divisional organizational structures are effective for program delivery, (b) the Central Resources structure and divisional and departmental reporting structures are moderately effective for program delivery, (c) the decentralized office structure is an advantage for service delivery but less so for administration and intra-division and inter-division communication, (d) the mandatory program structure involves low to moderate interdisciplinary teamwork and moderately impacts service delivery, (e) intra-division and management-staff communication are fair but inter-division and office communication are between poor and fair, (f) education, research, and service are moderately integrated, and (g) the divisional and departmental work atmospheres are a little positive. Management perceived greater participation in program planning, more frequent communication with other divisions, a number of education and research opportunities from various divisions/units, and more management recognition than front line staff did.

  18. WE-F-BRB-02: Setting the Stage for Incorporation of Toxicity Measures in Treatment Plan Assessments

    International Nuclear Information System (INIS)

    Mayo, C.

    2015-01-01

    Advancements in informatics in radiotherapy are opening up opportunities to improve our ability to assess treatment plans. Models on individualizing patient dose constraints from prior patient data and shape relationships have been extensively researched and are now making their way into commercial products. New developments in knowledge based treatment planning involve understanding the impact of the radiation dosimetry on the patient. Akin to radiobiology models that have driven intensity modulated radiotherapy optimization, toxicity and outcome predictions based on treatment plans and prior patient experiences may be the next step in knowledge based planning. In order to realize these predictions, it is necessary to understand how the clinical information can be captured, structured and organized with ontologies and databases designed for recall. Large databases containing radiation dosimetry and outcomes present the opportunity to evaluate treatment plans against predictions of toxicity and disease response. Such evaluations can be based on dose volume histogram or even the full 3-dimensional dose distribution and its relation to the critical anatomy. This session will provide an understanding of ontologies and standard terminologies used to capture clinical knowledge into structured databases; How data can be organized and accessed to utilize the knowledge in planning; and examples of research and clinical efforts to incorporate that clinical knowledge into planning for improved care for our patients. Learning Objectives: Understand the role of standard terminologies, ontologies and data organization in oncology Understand methods to capture clinical toxicity and outcomes in a clinical setting Understand opportunities to learn from clinical data and its application to treatment planning Todd McNutt receives funding from Philips, Elekta and Toshiba for some of the work presented

  19. Corrective Action Plan in response to the March 1992 Tiger Team Assessment of the Ames Laboratory

    International Nuclear Information System (INIS)

    1992-01-01

    On March 5, 1992, a Department of Energy (DOE) Tiger Team completed an assessment of the Ames Laboratory, located in Ames, Iowa. The purpose of the assessment was to provide the Secretary of Energy with a report on the status and performance of Environment, Safety and Health (ES ampersand H) programs at Ames Laboratory. Detailed findings of the assessment are presented in the report, DOE/EH-0237, Tiger Team Assessment of the Ames Laboratory. This document, the Ames Laboratory Corrective Action Plan (ALCAP), presents corrective actions to overcome deficiencies cited in the Tiger Team Assessment. The Tiger Team identified 53 Environmental findings, from which the Team derived four key findings. In the Safety and Health (S ampersand H) area, 126 concerns were identified, eight of which were designated Category 11 (there were no Category I concerns). Seven key concerns were derived from the 126 concerns. The Management Subteam developed 19 findings which have been summarized in four key findings. The eight S ampersand H Category 11 concerns identified in the Tiger Team Assessment were given prompt management attention. Actions to address these deficiencies have been described in individual corrective action plans, which were submitted to DOE Headquarters on March 20, 1992. The ALCAP includes actions described in this early response, as well as a long term strategy and framework for correcting all remaining deficiencies. Accordingly, the ALCAP presents the organizational structure, management systems, and specific responses that are being developed to implement corrective actions and to resolve root causes identified in the Tiger Team Assessment. The Chicago Field Office (CH), IowaState University (ISU), the Institute for Physical Research and Technology (IPRT), and Ames Laboratory prepared the ALCAP with input from the DOE Headquarters, Office of Energy Research (ER)

  20. Pollution prevention at the Kansas City Division through process waste assessments

    International Nuclear Information System (INIS)

    Pemberton, S.E.; Gentile, C.C.

    1992-01-01

    Allied-Signal Inc., Kansas City Division (KCD) is committed to the hazardous waste minimization requirements set forth under RCRA as amended by the Pollution Prevention Act and DOE Order 5400.1. To assure compliance with these regulations, the KCD has developed a comprehensive Pollution Prevention Program which focuses on the elimination or minimization of all material releases to all environmental media. The ownership of waste minimization is given to all of the waste generators through Departmental Pollution Prevention Plans. These plans include tools to achieve the waste minimization goals. One of these tools is the process waste assessment (PWA). A PWA is a planned procedure with the objective of identifying opportunities and methods to reduce or eliminate waste. A material balance is performed around a specific process which qualifies and quantifies the materials entering and exiting the process. These materials are further defined to the hazardous component level. The exiting materials are separated into what goes into the product, sent to waste management, and what is released to the air (fugitive or point source). Next, opportunities are identified and evaluated for the ability to eliminate or minimize the waste streams exiting the process. Therefore, the PWA provides the basic tool for the creation of a comprehensive process baseline and identification of opportunities to eliminate/minimize the release of hazardous and non-hazardous wastes. This presentation will describe the status and activities of the program conceived to initiate PWAs at the Kansas City Division (KCD) of Allied-Signal Inc.. This program is organized through business units Which consist of manufacturing, quality, and engineering personnel from a specific product line. The departments that these business units represent are the generators of the major process waste at the KCD. Included in the update will be a brief overview of the lessons learned from the methodology development and

  1. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: the city of Belgrade.

    Science.gov (United States)

    Josimović, Boško; Marić, Igor; Milijić, Saša

    2015-02-01

    Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results. Copyright © 2014 Elsevier Ltd. All rights reserved.

  2. Integrity assessment plan for PNL 300 area radioactive hazardous waste tank system. Final report

    International Nuclear Information System (INIS)

    1996-03-01

    The Pacific Northwest Laboratory (PNL), operated by Battelle Memorial Institute under contract to the U.S. Department of Energy, operates tank systems for the U.S. Department of Energy, Richland Operations Office (DOE-RL), that contain dangerous waste constituents as defined by Washington State Department of Ecology (WDOE) Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-040(18). Chapter 173-303-640(2) of the WAC requires the performance of integrity assessments for each existing tank system that treats or stores dangerous waste, except those operating under interim status with compliant secondary containment. This Integrity Assessment Plan (IAP) identifies all tasks that will be performed during the integrity assessment of the PNL-operated Radioactive Liquid Waste Systems (RLWS) associated with the 324 and 325 Buildings located in the 300 Area of the Hanford Site. It describes the inspections, tests, and analyses required to assess the integrity of the PNL RLWS (tanks, ancillary equipment, and secondary containment) and provides sufficient information for adequate budgeting and control of the assessment program. It also provides necessary information to permit the Independent, Qualified, Registered Professional Engineer (IQRPE) to approve the integrity assessment program

  3. Integrity assessment plan for PNL 300 area radioactive hazardous waste tank system. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The Pacific Northwest Laboratory (PNL), operated by Battelle Memorial Institute under contract to the U.S. Department of Energy, operates tank systems for the U.S. Department of Energy, Richland Operations Office (DOE-RL), that contain dangerous waste constituents as defined by Washington State Department of Ecology (WDOE) Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-040(18). Chapter 173-303-640(2) of the WAC requires the performance of integrity assessments for each existing tank system that treats or stores dangerous waste, except those operating under interim status with compliant secondary containment. This Integrity Assessment Plan (IAP) identifies all tasks that will be performed during the integrity assessment of the PNL-operated Radioactive Liquid Waste Systems (RLWS) associated with the 324 and 325 Buildings located in the 300 Area of the Hanford Site. It describes the inspections, tests, and analyses required to assess the integrity of the PNL RLWS (tanks, ancillary equipment, and secondary containment) and provides sufficient information for adequate budgeting and control of the assessment program. It also provides necessary information to permit the Independent, Qualified, Registered Professional Engineer (IQRPE) to approve the integrity assessment program.

  4. The inherent tensions arising from attempting to carry out strategic environmental assessments on all policies, plans and programmes

    International Nuclear Information System (INIS)

    McLauchlan, Anna; João, Elsa

    2012-01-01

    This paper evaluates the tensions that result from routinely applying SEA to all policies, plans and programmes within Scotland. The European Union SEA Directive, effective in many EU member states from 2004, introduced a requirement for environmental assessment of certain plans and programmes. Scotland, a devolved nation within the EU member state of the United Kingdom, aimed to be a ‘world leader in SEA’ by legislating for SEA to be undertaken of all public sector plans, programmes and strategies, with the word ‘strategies’ being equated with ‘policies’. This paper presents detailed data regarding Scottish SEA activity between 2004 and 2007, including responses to consultations on SEA reports. This empirical research found that, reflecting a general difficulty in determining where and when SEA should be applied, engagement with the SEA process was not as widespread as intended (including the pre-screening and screening stages). Eight tensions evident from Scotland's application of SEA are identified, and their broader relevance is examined. - Highlights: ► We examine detailed data regarding Scottish strategic environmental assessment (SEA) activity. ► There is a general difficulty in determining where SEA should be applied. ► Engagement with the SEA process was not as widespread as intended. ► Eight ‘tensions’ that question the efficacy of applying SEA to all plans, programmes and policies were identified.

  5. Five Levels of Curriculum Integration Defined, Refined, and Described.

    Science.gov (United States)

    Schumacher, Donna H.

    1995-01-01

    Provides a description of five levels of curriculum integration at the middle level, specifically: departmentalization, reinforcement, complementary or shared units, webbed, and integrated themes. Discusses curriculum integration in relation to preservice and inservice programs, common planning time, team composition, time issues, and…

  6. 78 FR 14415 - Publication of Fiscal Year 2012 Service Contract Inventory Analysis

    Science.gov (United States)

    2013-03-05

    ... DEPARTMENT OF THE TREASURY Publication of Fiscal Year 2012 Service Contract Inventory Analysis AGENCY: Departmental Offices, Treasury. ACTION: Notice of publication of Fiscal Year 2012 Service Contract Inventory: Analysis of the FY 2012 Inventory and Planned Analysis of 2013. SUMMARY: The Department...

  7. National action plan 2011-2015 for the management of the radon-related risk. Assessment of the National action plan 2011-2015 for the management of the radon-related risk

    International Nuclear Information System (INIS)

    Grall, Jean-Yves; Crepon, Etienne; Combrexelle, Jean-Denis; Niel, Jean-Christophe

    2011-01-01

    After a presentation of the context, and a brief assessment of the previous national action plan (2005-2008), a first report presents the second national action plan for 2011-2015 with its 8 main axes (implementation of a policy for the management of radon-related risk in existing dwellings, implementation of a regulation for new dwellings, follow-up of the regulation for buildings open to public and of the regulations applied to workers, development of new management tools and of a new operational device to perform building diagnosis and to perform works by building professionals, coordination of the study and research policy) and its 8 main measures. After a synthetic presentation of actions, 30 sheets present the different actions associated with each axis. A second report proposes an assessment of these 30 actions

  8. 2006-2007 Academic Training Programme Questionnaire

    CERN Multimedia

    Françoise Benz

    2006-01-01

    Please help the Academic Training Committee to plan the 2006-07 programme of lectures by filling in the 2006-07 Academic Training Programme Questionnaire, which can be found at: http://academia.web.cern.ch/academia/questionnaire/ If you wish to participate in one of the following courses, please tell to your supervisor and apply electronically from the course description pages that can be found on the Web at: http://www.cern.ch/Training/ or fill in an 'application for training'form available from your Departmental Secretariat or from your DTO (Departmental Training Officer). Applications will be accepted in the order in which they are received.

  9. Assessing, planning, and management of North Sea oil development effects in the Shetland Islands

    International Nuclear Information System (INIS)

    Nelson, J.G.; Butler, R.W.

    1993-01-01

    The Shetland Islands have long had the reputation of having planned and managed the onshore effects of offshore petroleum development very well. The islands are seen as something of a model for others to follow and have frequently been visited since the beginning of northern North Sea oil development in the early 1970s by those wishing to learn how to best approach offshore petroleum development in their home areas. In this assessment the authors wish to focus on views expressed on the effectiveness of the planning and managing of onshore effects of petroleum development and present an overview of interviewee statements on future issues. Emphasis will be placed on the environmental aspects, where that term is taken for present purposes, to include fauna, flora, water quality, and other resources and their relationships to industries such as fishing and tourism--although observations will also be made about planning and management of land use and socio-economic effects. The paper concludes with an attempt to set their findings in a broader pluralist context by relating them to the views expressed in recent books by Shetland residents that contain observations on oil effects although written for more general purposes

  10. Water-sensitivity assessment of regional spatial plan based on the relation between watershed imperviousness and aquatic ecosystem health

    Science.gov (United States)

    Sutjiningsih, D.; Soeryantono, H.; Anggraheni, E.

    2018-04-01

    Upper Ciliwung watershed in the JABODETABEKPUNJUR area experiencing rapid population growth, which in turn promotes the pace of infrastructure development especially increasing impervious land cover. This will trigger various stressors to the abiotic and biotic elements in the aquatic ecosystem. This study aims to examine whether the relationship between imperviousness in the subwatersheds in Upper Ciliwung and abiotic/biotic elements of its aquatic ecosystems can be used to assess the degree of water-sensitivity of the related regional spatial plan. Two scenarios of impervious cover changes have been assessed, scenario 1 using constant growth of 7.56% per annum, while scenario 2 refers to regional spatial plan of Bogor Regency. Although there are inconsistencies in four (out of 13) subwatersheds, the tests proved that the procedure is succesful to be applied in Upper Ciliwung.

  11. Groundwater quality assessment plan for the 1324-N/NA Site: Phase 1 (first determination)

    International Nuclear Information System (INIS)

    Hartman, M.J.

    1998-05-01

    The 1324-N Surface Impoundment and 1324-NA Percolation Pond (1324-N/NA Site) are treatment/storage/disposal sites regulated under the Resource Conservation and Recovery Act of 1976 (RCRA). They are located in the 100-N Area of the Hanford Site, and were used to treat and dispose of corrosive waste from a water treatment plant. Groundwater monitoring under an interim-status detection program compared indicator parameters from downgradient wells to background values established from an upgradient well. One of the indicator parameters, total organic carbon (TOC), exceeded its background value in one downgradient well, triggering an upgrade from a detection program to an assessment program. This plan presents the first phase of the assessment program

  12. International Space Station (ISS) Plasma Contactor Unit (PCU) Utilization Plan Assessment Update

    Science.gov (United States)

    Hernandez-Pellerano, Amri; Iannello, Christopher J.; Garrett, Henry B.; Ging, Andrew T.; Katz, Ira; Keith, R. Lloyd; Minow, Joseph I.; Willis, Emily M.; Schneider, Todd A.; Whittlesey, Edward J.; hide

    2014-01-01

    The International Space Station (ISS) vehicle undergoes spacecraft charging as it interacts with Earth's ionosphere and magnetic field. The interaction can result in a large potential difference developing between the ISS metal chassis and the local ionosphere plasma environment. If an astronaut conducting extravehicular activities (EVA) is exposed to the potential difference, then a possible electrical shock hazard arises. The control of this hazard was addressed by a number of documents within the ISS Program (ISSP) including Catastrophic Safety Hazard for Astronauts on EVA (ISS-EVA-312-4A_revE). The safety hazard identified the risk for an astronaut to experience an electrical shock in the event an arc was generated on an extravehicular mobility unit (EMU) surface. A catastrophic safety hazard, by the ISS requirements, necessitates mitigation by a two-fault tolerant system of hazard controls. Traditionally, the plasma contactor units (PCUs) on the ISS have been used to limit the charging and serve as a "ground strap" between the ISS structure and the surrounding ionospheric plasma. In 2009, a previous NASA Engineering and Safety Center (NESC) team evaluated the PCU utilization plan (NESC Request #07-054-E) with the objective to assess whether leaving PCUs off during non-EVA time periods presented risk to the ISS through assembly completion. For this study, in situ measurements of ISS charging, covering the installation of three of the four photovoltaic arrays, and laboratory testing results provided key data to underpin the assessment. The conclusion stated, "there appears to be no significant risk of damage to critical equipment nor excessive ISS thermal coating damage as a result of eliminating PCU operations during non- EVA times." In 2013, the ISSP was presented with recommendations from Boeing Space Environments for the "Conditional" Marginalization of Plasma Hazard. These recommendations include a plan that would keep the PCUs off during EVAs when the

  13. Performance Assessment Monitoring Plan for the Hanford Site Low-Level Waste Burial Grounds

    International Nuclear Information System (INIS)

    SONNICHSEN, J.C.

    2000-01-01

    As directed by the U.S. Department of Energy (DOE), Richland Operations Office (DOE-RL), Fluor Hanford, Inc. will implement the requirements of DOE Order 435.1, Radioactive Waste Management, as the requirements relate to the continued operation of the low-level waste disposal facilities on the Hanford Site. DOE Order 435.1 requires a disposal authorization statement authorizing operation (or continued operation) of a low-level waste disposal facility. The objective of this Order is to ensure that all DOE radioactive waste is managed in a manner that protects the environment and personnel and public health and safety. The manual (DOE Order 435.1 Manual) implementing the Order states that a disposal authorization statement shall be issued based on a review of the facility's performance assessment and composite analysis or appropriate Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) of 1980 documentation. The disposal authorization shall specify the limits and conditions on construction, design, operations, and closure of the low-level waste facility. Failure to obtain a disposal authorization statement shall result in shutdown of an operational disposal facility. In fulfillment of the requirements of DOE Order 435.1, a disposal authorization statement was issued on October 25, 1999, authorizing the Hanford Site to transfer, receive, possess, and dispose of low-level radioactive waste at the 200 East Area and the 200 West Area Low-Level Burial Grounds. The disposal authorization statement constitutes approval of the performance assessment and composite analysis, authorizes operation of the facility, and includes conditions that the disposal facility must meet. One of the conditions is that monitoring plans for the 200 East Area and 200 West Area Low-Level Burial Grounds be written and approved by the DOE-RL. The monitoring plan is to be updated and implemented within 1 year following issuance of the disposal authorization statement to

  14. Assessing habitat risk from human activities to inform coastal and marine spatial planning: a demonstration in Belize

    International Nuclear Information System (INIS)

    Arkema, Katie K; Wood, Spencer A; Ruckelshaus, Mary; Verutes, Gregory; Rosenthal, Amy; Bernhardt, Joanna R; Clarke, Chantalle; Rosado, Samir; Canto, Maritza; McField, Melanie; De Zegher, Joann

    2014-01-01

    Integrated coastal and ocean management requires transparent and accessible approaches for understanding the influence of human activities on marine environments. Here we introduce a model for assessing the combined risk to habitats from multiple ocean uses. We apply the model to coral reefs, mangrove forests and seagrass beds in Belize to inform the design of the country’s first Integrated Coastal Zone Management (ICZM) Plan. Based on extensive stakeholder engagement, review of existing legislation and data collected from diverse sources, we map the current distribution of coastal and ocean activities and develop three scenarios for zoning these activities in the future. We then estimate ecosystem risk under the current and three future scenarios. Current levels of risk vary spatially among the nine coastal planning regions in Belize. Empirical tests of the model are strong—three-quarters of the measured data for coral reef health lie within the 95% confidence interval of interpolated model data and 79% of the predicted mangrove occurrences are associated with observed responses. The future scenario that harmonizes conservation and development goals results in a 20% reduction in the area of high-risk habitat compared to the current scenario, while increasing the extent of several ocean uses. Our results are a component of the ICZM Plan for Belize that will undergo review by the national legislature in 2015. This application of our model to marine spatial planning in Belize illustrates an approach that can be used broadly by coastal and ocean planners to assess risk to habitats under current and future management scenarios. (letter)

  15. Planning Electric Transmission Lines: A Review of Recent Regional Transmission Plans

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-04-13

    The first Quadrennial Energy Review (QER) recommends that the U.S. Department of Energy (DOE) conduct a national review of transmission plans and assess the barriers and incentives to their implementation. DOE tasked Lawrence Berkeley National Laboratory (LBNL) to prepare two reports to support the agency’s response to this recommendation. This report reviews regional transmission plans and regional transmission planning processes that have been directed by Federal Energy Regulatory Commission (FERC) Order Nos. 890 and 1000. We focus on the most recent regional transmission plans (those issued in 2015 and through approximately mid-year 2016) and current regional transmission planning processes. A companion report focuses on non-plan-related factors that affect transmission projects.

  16. Treatment planning source assessment

    International Nuclear Information System (INIS)

    Calzetta Larrieu, O.; Blaumann, H.; Longhino, J.

    2000-01-01

    The reactor RA-6 NCT system was improved during the last year mainly in two aspects: the facility itself getting lower contamination factors and using better measurements techniques to obtain lower uncertainties in its characterization. In this job we show the different steps to get the source to be used in the treatment planning code representing the NCT facility. The first one was to compare the dosimetry in a water phantom between the calculation using the entire facility including core, filter and shields and a surface source at the end of the beam. The second one was to transform this particle by particle source in a distribution one regarding the minimum spatial, energy and angular resolution to get similar results. Finally we compare calculation and experimental values with and without the water phantom to adjust the distribution source. The results are discussed. (author)

  17. Attitudes of Special Education Teachers and School Psychologists toward Individualized Education Plan IEPs Developed Using Traditional Assessments versus IEPs Developed Using a Multiple Intelligence Assessment

    Science.gov (United States)

    Alhajri, Meshari A SH A.

    2011-01-01

    The purpose of this research was to determine the usefulness of Multiple Intelligence for educational planning for students in special education. More specifically, this study applied the Multiple Intelligences Developmental Assessment Scales (MIDAS) to a sample of students receiving special education services who had IEPs developed using…

  18. Increasing emergency medicine residents' confidence in disaster management: use of an emergency department simulator and an expedited curriculum.

    Science.gov (United States)

    Franc, Jeffrey Michael; Nichols, Darren; Dong, Sandy L

    2012-02-01

    Disaster Medicine is an increasingly important part of medicine. Emergency Medicine residency programs have very high curriculum commitments, and adding Disaster Medicine training to this busy schedule can be difficult. Development of a short Disaster Medicine curriculum that is effective and enjoyable for the participants may be a valuable addition to Emergency Medicine residency training. A simulation-based curriculum was developed. The curriculum included four group exercises in which the participants developed a disaster plan for a simulated hospital. This was followed by a disaster simulation using the Disastermed.Ca Emergency Disaster Simulator computer software Version 3.5.2 (Disastermed.Ca, Edmonton, Alberta, Canada) and the disaster plan developed by the participants. Progress was assessed by a pre- and post-test, resident evaluations, faculty evaluation of Command and Control, and markers obtained from the Disastermed.Ca software. Twenty-five residents agreed to partake in the training curriculum. Seventeen completed the simulation. There was no statistically significant difference in pre- and post-test scores. Residents indicated that they felt the curriculum had been useful, and judged it to be preferable to a didactic curriculum. In addition, the residents' confidence in their ability to manage a disaster increased on both a personal and and a departmental level. A simulation-based model of Disaster Medicine training, requiring approximately eight hours of classroom time, was judged by Emergency Medicine residents to be a valuable component of their medical training, and increased their confidence in personal and departmental disaster management capabilities.

  19. 75 FR 63438 - Submission for OMB Review; Comment Request

    Science.gov (United States)

    2010-10-15

    ... DEPARTMENT OF COMMERCE Submission for OMB Review; Comment Request The Department of Commerce will... persons to participate in the development of such plans, and (b) which take into account the social and... writing Diana Hynek, Departmental Paperwork Clearance Officer, (202) 482-0266, Department of Commerce...

  20. Comparative assessment of national bioenergy strategies and biomass action plans in 12 EU countries. European Best Practice Report. Extended version

    International Nuclear Information System (INIS)

    2009-01-01

    This report is a key output of the EU project 'BAP Driver', an initiative of energy agencies from 8 European key bioenergy nations and the European Biomass Association (AEBIOM). The BAP Driver project aims at identifying ways for improvement of current national policy frameworks for bioenergy in Europe, and at leveraging the process of developing country-specific Biomass Action Plans (BAP). From a strategic perspective, the general approach of this report focuses on four stages, required for setting up national biomass strategies and action plans: Assessment of national biomass resources; Formulation of national bioenergy strategies and biomass action plans; Implementation of national bioenergy policies; Monitoring of national bioenergy markets and policies. Overall the analysis is split into three chapters corresponding to the following logical steps: Chapter B: Country analysis (12 individual country profiles); Chapter C: Benchmark analysis (comparative assessment of 12 countries); Chapter D: Best practice analysis (transnational conclusions across national boundaries)

  1. Comparative assessment of national bioenergy strategies and biomass action plans in 12 EU countries. European Best Practice Report. Executive Summary

    International Nuclear Information System (INIS)

    2009-01-01

    This report is a key output of the EU project 'BAP Driver', an initiative of energy agencies from 8 European key bioenergy nations and the European Biomass Association (AEBIOM). The BAP Driver project aims at identifying ways for improvement of current national policy frameworks for bioenergy in Europe, and at leveraging the process of developing country-specific Biomass Action Plans (BAP). From a strategic perspective, the general approach of this report focuses on four stages, required for setting up national biomass strategies and action plans: Assessment of national biomass resources; Formulation of national bioenergy strategies and biomass action plans; Implementation of national bioenergy policies; Monitoring of national bioenergy markets and policies. Overall the analysis is split into three chapters corresponding to the following logical steps: Chapter B: Country analysis (12 individual country profiles); Chapter C: Benchmark analysis (comparative assessment of 12 countries); Chapter D: Best practice analysis (transnational conclusions across national boundaries)

  2. Patient-specific instrumentation for total knee arthroplasty does not match the pre-operative plan as assessed by intra-operative computer-assisted navigation.

    Science.gov (United States)

    Scholes, Corey; Sahni, Varun; Lustig, Sebastien; Parker, David A; Coolican, Myles R J

    2014-03-01

    The introduction of patient-specific instruments (PSI) for guiding bone cuts could increase the incidence of malalignment in primary total knee arthroplasty. The purpose of this study was to assess the agreement between one type of patient-specific instrumentation (Zimmer PSI) and the pre-operative plan with respect to bone cuts and component alignment during TKR using imageless computer navigation. A consecutive series of 30 femoral and tibial guides were assessed in-theatre by the same surgeon using computer navigation. Following surgical exposure, the PSI cutting guides were placed on the joint surface and alignment assessed using the navigation tracker. The difference between in-theatre data and the pre-operative plan was recorded and analysed. The error between in-theatre measurements and pre-operative plan for the femoral and tibial components exceeded 3° for 3 and 17% of the sample, respectively, while the error for total coronal alignment exceeded 3° for 27% of the sample. The present results indicate that alignment with Zimmer PSI cutting blocks, assessed by imageless navigation, does not match the pre-operative plan in a proportion of cases. To prevent unnecessary increases in the incidence of malalignment in primary TKR, it is recommended that these devices should not be used without objective verification of alignment, either in real-time or with post-operative imaging. Further work is required to identify the source of discrepancies and validate these devices prior to routine use. II.

  3. Suburban landscape assessment applied to urban planning. Case study in Barcelona Metropolitan Region

    Directory of Open Access Journals (Sweden)

    David Serrano Giné

    2015-12-01

    Full Text Available Urban fringes set complex landscapes, in transition from rural to natural and urban, with fuzzy boundaries in mutual interdependence. The European Landscape Convention gives notorious importance to everyday landscapes, including those of suburban character. Few landscape evaluation researches are done in suburban areas, which is surprising considering its importance and abundance. This paper shows a methodology, yield on geographical information systems (GIS, for landscape assessment of suburban areas, useful in urban planning. Its main interest lies in a double assessment, which considers both landscape quality and landscape fragility, applied systematically. The procedure is applied in Muntanyes d’Ordal in the metropolitan area of Barcelona (Spain, an area with pronounced regional strengths and contrasted landscape values. Results are of important applicability and indicate a predominance of mean values, both for landscape quality and landscape fragility.

  4. Developing nursing care plans.

    Science.gov (United States)

    Ballantyne, Helen

    2016-02-24

    This article aims to enhance nurses' understanding of nursing care plans, reflecting on the past, present and future use of care planning. This involves consideration of the central theories of nursing and discussion of nursing models and the nursing process. An explanation is provided of how theories of nursing may be applied to care planning, in combination with clinical assessment tools, to ensure that care plans are context specific and patient centred.

  5. Planning the Unplanned Experiment: Assessing the Efficacy of Standards for Safety Critical Software

    Science.gov (United States)

    Graydon, Patrick J.; Holloway, C. Michael

    2015-01-01

    We need well-founded means of determining whether software is t for use in safety-critical applications. While software in industries such as aviation has an excellent safety record, the fact that software aws have contributed to deaths illustrates the need for justi ably high con dence in software. It is often argued that software is t for safety-critical use because it conforms to a standard for software in safety-critical systems. But little is known about whether such standards `work.' Reliance upon a standard without knowing whether it works is an experiment; without collecting data to assess the standard, this experiment is unplanned. This paper reports on a workshop intended to explore how standards could practicably be assessed. Planning the Unplanned Experiment: Assessing the Ecacy of Standards for Safety Critical Software (AESSCS) was held on 13 May 2014 in conjunction with the European Dependable Computing Conference (EDCC). We summarize and elaborate on the workshop's discussion of the topic, including both the presented positions and the dialogue that ensued.

  6. Integrating fire behavior models and geospatial analysis for wildland fire risk assessment and fuel management planning

    Science.gov (United States)

    Alan A. Ager; Nicole M. Vaillant; Mark A. Finney

    2011-01-01

    Wildland fire risk assessment and fuel management planning on federal lands in the US are complex problems that require state-of-the-art fire behavior modeling and intensive geospatial analyses. Fuel management is a particularly complicated process where the benefits and potential impacts of fuel treatments must be demonstrated in the context of land management goals...

  7. Multi-actor involvement for integrating ecosystem services in strategic environmental assessment of spatial plans

    International Nuclear Information System (INIS)

    Rozas-Vásquez, Daniel; Fürst, Christine; Geneletti, Davide; Muñoz, Francisco

    2017-01-01

    Integrating an ecosystem services (ES) approach into Strategic Environmental Assessment (SEA) of spatial plans potentially enhances the consideration of the value of nature in decision making and policy processes. However, there is increasing concern about the institutional context and a lack of a common understanding of SEA and ecosystem services for adopting them as an integrated framework. This paper addresses this concern by analysing the current understanding and network relations in a multi-actor arrangement as a first step towards a successful integration of ES in SEA and spatial planning. Our analysis focuses on a case study in Chile, where we administered a questionnaire survey to some of the main actors involved in the spatial planning process. The questionnaire focused on issues such as network relations among actors and on conceptual understanding, perceptions and challenges for integrating ES in SEA and spatial planning, knowledge on methodological approaches, and the connections and gaps in the science-policy interface. Our findings suggest that a common understanding of SEA and especially of ES in a context of multiple actors is still at an initial stage in Chile. Additionally, the lack of institutional guidelines and methodological support is considered the main challenge for integration. We conclude that preconditions exist in Chile for integrating ES in SEA for spatial planning, but they strongly depend on appropriate governance schemes that promote a close science-policy interaction, as well as collaborative work and learning. - Highlights: • Linking ecosystem services in SEA is an effective framework for sustainability. • Multi-actor understanding and networks in ecosystem services and SEA were analyzed. • Understanding of SEA and especially of ES is still in an initial stage in Chile. • A lack of institutional guidelines is one of the key challenges for this link.

  8. Multi-actor involvement for integrating ecosystem services in strategic environmental assessment of spatial plans

    Energy Technology Data Exchange (ETDEWEB)

    Rozas-Vásquez, Daniel, E-mail: danielrozas@gmail.com [Center for Development Research, Dept. Ecology and Natural Resources Management, University of Bonn, Walter Flex Str. 3, 53113 Bonn (Germany); Laboratorio de Planificación Territorial, Universidad Católica de Temuco, Rudecindo ortega, 02950 Temuco (Chile); Fürst, Christine [Martin Luther University Halle-Wittenberg, Dept. Natural Sciences III, Institute for Geosciences and Geography, Von Seckendorff-Platz 4, 06120 Halle-Saale (Germany); Geneletti, Davide [University of Trento, Department of Civil, Environmental and Mechanical Engineering, via Mesiano, 77, Trento 38123 (Italy); Muñoz, Francisco [Laboratorio de Planificación Territorial, Universidad Católica de Temuco, Rudecindo ortega, 02950 Temuco (Chile)

    2017-01-15

    Integrating an ecosystem services (ES) approach into Strategic Environmental Assessment (SEA) of spatial plans potentially enhances the consideration of the value of nature in decision making and policy processes. However, there is increasing concern about the institutional context and a lack of a common understanding of SEA and ecosystem services for adopting them as an integrated framework. This paper addresses this concern by analysing the current understanding and network relations in a multi-actor arrangement as a first step towards a successful integration of ES in SEA and spatial planning. Our analysis focuses on a case study in Chile, where we administered a questionnaire survey to some of the main actors involved in the spatial planning process. The questionnaire focused on issues such as network relations among actors and on conceptual understanding, perceptions and challenges for integrating ES in SEA and spatial planning, knowledge on methodological approaches, and the connections and gaps in the science-policy interface. Our findings suggest that a common understanding of SEA and especially of ES in a context of multiple actors is still at an initial stage in Chile. Additionally, the lack of institutional guidelines and methodological support is considered the main challenge for integration. We conclude that preconditions exist in Chile for integrating ES in SEA for spatial planning, but they strongly depend on appropriate governance schemes that promote a close science-policy interaction, as well as collaborative work and learning. - Highlights: • Linking ecosystem services in SEA is an effective framework for sustainability. • Multi-actor understanding and networks in ecosystem services and SEA were analyzed. • Understanding of SEA and especially of ES is still in an initial stage in Chile. • A lack of institutional guidelines is one of the key challenges for this link.

  9. 77 FR 54570 - Notice of Submission for OMB Review; Office of Planning, Evaluation and Policy Development...

    Science.gov (United States)

    2012-09-05

    ... information should be addressed to U.S. Department of Education, 400 Maryland Avenue SW., LBJ, Washington, DC... Departmental review of the information collection. The Department of Education is especially interested in... respondents, including through the use of information technology. Please note that written comments received...

  10. Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the NTS

    Energy Technology Data Exchange (ETDEWEB)

    Vefa Yucel

    2007-01-03

    U.S. Department of Energy (DOE) Manual M 435.1-1 requires that performance assessments (PAs) and composite analyses (CAs) for low-level waste (LLW) disposal facilities be maintained by the field offices. This plan describes the activities performed to maintain the PA and the CA for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada Test Site (NTS). This plan supersedes the Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (DOE/NV/11718--491-REV 1, dated September 2002). The plan is based on U.S. Department of Energy (DOE) Order 435.1 (DOE, 1999a), DOE Manual M 435.1-1 (DOE, 1999b), the DOE M 435.1-1 Implementation Guide DOE G 435.1-1 (DOE, 1999c), and the Maintenance Guide for PAs and CAs (DOE, 1999d). The plan includes a current update on PA/CA documentation, a revised schedule, and a section on Quality Assurance.

  11. 77 FR 45650 - Interior Fire Program Assessment 2012

    Science.gov (United States)

    2012-08-01

    ... the Interior, Environment, and Related Agencies Appropriation Bill for fiscal year 2012, the House of... management services in support of the Departmental and bureau missions and to better direct scarce resources... been conducted as they are a major partner in the Federal wildland fire management program. On June 19...

  12. Public Participation Planning of Environmental Impact Assessment (EIA) and Regulations: Analysis of Inconsistency for Some Cases in Indonesia

    Science.gov (United States)

    Hindrayani, Aniek; Purwanto

    2018-02-01

    The failure in community involvement during the environmental documents planning may result in the failure of the planned project implementation. This study aims to determine the gap between practices and regulations that apply to the process of community involvement in the environmental documents planning, and find out inconsistency of implementation on each stakeholder in the planning of the Environmental Impact Assessment (EIA) and the environmental permit. The method used was qualitative through interview and literature study which is analyzed using triangulation model and presented in the form of concept map. The results of the study indicate that 1) the determination of community representatives based on the criteria of the impacted communities is not clearly described, 3) suggestions, opinions, and responses to the environmental impact management are not well implemented by the project proponent, 3) implementation of the environmental management of other licensed activities affecting the behavior (4) stakeholders (project proponent, EIA consultants, and EIA appraisal committee) do not play their role as mandated in applicable legislation.

  13. An Automation Planning Primer.

    Science.gov (United States)

    Paynter, Marion

    1988-01-01

    This brief planning guide for library automation incorporates needs assessment and evaluation of options to meet those needs. A bibliography of materials on automation planning and software reviews, library software directories, and library automation journals is included. (CLB)

  14. Venous thromboembolism prophylaxis risk assessment in a general surgery cohort: a closed-loop audit.

    Science.gov (United States)

    McGoldrick, D M; Redmond, H P

    2017-08-01

    Venous thromboembolism (VTE) is a potential source of morbidity and mortality in surgical in-patients. A number of guidelines exist that advise on prophylactic measures. We aimed to assess VTE prophylaxis prescribing practices and compliance with a kardex-based risk assessment tool in a general surgery population. Data on general surgery in-patients were collected on two separate wards on two separate days. Drug kardexes were assessed for VTE prophylaxis measures and use of the risk assessment tool. NICE and SIGN guidelines were adopted as a gold standard. The audit results and information on the risk assessment tool were presented as an educational intervention at two separate departmental teaching sessions. A re-audit was completed after 3 months. In Audit A, 74 patients were assessed. 70% were emergency admissions. The risk assessment tool was completed in 2.7%. 75 and 97% of patients were correctly prescribed anti-embolic stockings (AES) and low-molecular weight heparin (LMWH), respectively. 30 patients were included in Audit B, 56% of whom were emergency admissions. 66% had a risk assessment performed, a statistically significant improvement (p audit and intervention.

  15. Research Planning Process

    Science.gov (United States)

    Lofton, Rodney

    2010-01-01

    This presentation describes the process used to collect, review, integrate, and assess research requirements desired to be a part of research and payload activities conducted on the ISS. The presentation provides a description of: where the requirements originate, to whom they are submitted, how they are integrated into a requirements plan, and how that integrated plan is formulated and approved. It is hoped that from completing the review of this presentation, one will get an understanding of the planning process that formulates payload requirements into an integrated plan used for specifying research activities to take place on the ISS.

  16. Transparent stakeholder engagement in practice: Lessons learned from applying comprehensive environmental assessment to research planning for nanomaterials.

    Science.gov (United States)

    Powers, Christina; Hendren, Christine; Wang, Amy; Davis, J Michael

    2014-10-01

    As efforts to develop new applications of engineered nanoscale materials (ENMs) continue to grow, so too has interest in the environmental, health, and safety (EHS) implications of these materials. However, thorough evaluation and interpretation of such implications could require substantial resources (e.g., estimated as >$120 million per year in federal funding 2013-2017). A structured, strategic approach for transparently planning research would support improved linkages between ENM research and risk assessments, and thereby enhance the utility of financial and other resources for EHS studies of ENMs. For this reason, we applied Comprehensive Environmental Assessment (CEA) as an approach to provide transparent input into research planning for 2 types of ENMs: nanoscale titanium dioxide and nanoscale silver. For each of these CEA applications, we employed a collective judgment method known as Nominal Group Technique (NGT) in 2 workshops sponsored by the US Environmental Protection Agency (USEPA). The objective of this paper is to present the outcomes of these CEA applications in the context of how our methodology can inform future efforts to identify collective goals in science (e.g., research priorities) through structured decision support approaches. Outcomes include clear lists of research priorities for each ENM developed through transparently engaging stakeholders having diverse technical and sector perspectives. In addition, we identified several procedural aspects that could be refined, including emphasizing breakout group interactions, identifying broad information priorities before more detailed research questions, and using rating rather than ranking prioritization methods. Beyond the research directions identified for specific ENMs, lessons learned about engaging stakeholders in research planning are expected to inform future research planning efforts for ENMs and other emerging materials across the scientific community. © 2014 SETAC.

  17. 48 CFR 1408.802 - Policy.

    Science.gov (United States)

    2010-10-01

    ... PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Printing and Related Supplies 1408.802... the aggregate of multiple pages. Such duplicating units shall require Departmental approval to be... to 2,500 production units in the aggregate of multiple pages. This volume standard is referred to as...

  18. 75 FR 39729 - Departmental Offices; Debt Management Advisory Committee Meeting

    Science.gov (United States)

    2010-07-12

    ... final decisions on major financing operations. Historically, this advice has been offered by debt.... Although the Treasury's final announcement of financing plans may not reflect the recommendations provided... economic conditions and financing estimates. This briefing will give the press an opportunity to ask...

  19. A social assessment of urban parkland: Analyzing park use and meaning to inform management and resilience planning

    Science.gov (United States)

    Lindsay K. Campbell; Erika S. Svendsen; Nancy Falxa Sonti; Michelle L. Johnson

    2016-01-01

    Globally, municipalities are tackling climate adaptation and resilience planning. Urban green space has crucial biophysical buffering capacities, but also affects social interactions and human well-being. This paper considers the social dimension of urban green space, through an assessment focused on park use, function, and meanings, and compares results to categories...

  20. 78 FR 79688 - Paiute Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Science.gov (United States)

    2013-12-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF14-4-000] Paiute Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned 2015 Elko Area Expansion Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory...