WorldWideScience

Sample records for departmental assessment plan

  1. Prospects offered by the departmental plans inspection; Les perspectives offertes par la revision des plans departementaux

    Energy Technology Data Exchange (ETDEWEB)

    Thauvin, Ph.

    2000-07-01

    In the framework of the departmental plans inspection, a detailed document is presented on the domestic and industrial wastes management. These plans forecast an increase of the recycling facing the incineration, a mastership of the costs, a better application of the regulations and a campaign of public information. The indicators of control and the main points of these plans are discussed, supported by tables and definitions. (A.L.B.)

  2. Departmental plans of domestic wastes management - evaluation 2002; Plans departementaux d'elimination des dechets menager assimiles - bilan 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-03-01

    The departmental plans of domestic wastes management are official documents which manage the actions needed to realize the legislative and regulation objectives concerning the domestic wastes and related wastes. A first evaluation has been realized in 1997 for 47 edited plans. In the context of the new wastes policy a new evaluation has been realized by the ADEME in 2002 for 98 plans. It provides the methodology of the study, the analysis of the plans, the sites and management of wastes, economic data, the equipment and investments. (A.L.B.)

  3. DEPARTMENTALIZATION OF READING IN ELEMENTARY AND SECONDARY SCHOOLS.

    Science.gov (United States)

    STOWE, ELAINE H.

    DEPARTMENTALIZATION IS A FORM OF GROUPING FOR INSTRUCTION, AN ADMINISTRATIVE METHOD FOR ASSIGNING PUPILS TO TEACHERS IN SOME PLANNED MANNER. SOME PRECEDENTS FOR THE RECENT REVIVAL OF DEPARTMENTALIZATION IN THE ELEMENTARY GRADES ARE CITED. THE FOLLOWING EXAMPLES OF DEPARTMENTALIZATION ORGANIZATION ARE DISCUSSED IN DETAIL--A PROGRAM INVOLVING…

  4. DEPARTMENTALIZATION IN ELEMENTARY SCHOOLS.

    Science.gov (United States)

    American Association of School Administrators, Washington, DC.

    THE RESULTS OF A SURVEY CONCERNED WITH DEPARTMENTALIZATION IN ELEMENTARY SCHOOLS ARE REPORTED IN STATISTICAL TABLES WHICH ARE ACCOMPANIED BY DESCRIPTIVE COMMENTARY. FOR THE PURPOSE OF THE SURVEY, THE DEFINITION OF DEPARTMENTALIZATION IS RESTRICTED TO INCLUDE ONLY THOSE SITUATIONS IN WHICH STUDENTS RECEIVE INSTRUCTION IN THE VARIOUS ACADEMIC…

  5. 78 FR 55257 - Request for Comments on the Draft Departmental Strategic Plan for FY 2014-2018

    Science.gov (United States)

    2013-09-10

    ... strategic planning consultation process is an opportunity for the Department to refine and strengthen the... and Human Services, Office of the Assistant Secretary for Planning and Evaluation, Strategic Planning... planning process under the Government Performance and Results Modernization Act of 2010 (GPRA-MA) (Pub. L...

  6. Departmental Appeals Board Decisions

    Data.gov (United States)

    U.S. Department of Health & Human Services — Decisions issued by the Chair and Board Members of the Departmental Appeals Board concerning determinations in discretionary, project grant programs, including...

  7. Assessing Assessment Texts: Where Is Planning?

    Science.gov (United States)

    Fives, Helenrose; Barnes, Nicole; Dacey, Charity; Gillis, Anna

    2016-01-01

    We conducted a content analysis of 27 assessment textbooks to determine how assessment planning was framed in texts for preservice teachers. We identified eight assessment planning themes: alignment, assessment purpose and types, reliability and validity, writing goals and objectives, planning specific assessments, unpacking, overall assessment…

  8. Management self assessment plan

    Energy Technology Data Exchange (ETDEWEB)

    Debban, B.L.

    1998-01-30

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations.

  9. Management self assessment plan

    International Nuclear Information System (INIS)

    Debban, B.L.

    1998-01-01

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations

  10. Multiage Assessment: One School's Plan.

    Science.gov (United States)

    Arnold, Sue Beth; Kidwell, Barbara; Rossman, David

    1998-01-01

    Describes one elementary school's multiage assessment plan. Describes how standards were developed, and describes the assessment plan's guiding element: the progress report arranged as a continuum of objectives that serve as a goal indicator and a reporting mechanism. Discusses how objectives are assessed, record keeping and documentation, and the…

  11. Self-Evaluation for the Departmental Chairperson

    Science.gov (United States)

    Oliverio, Mary Ellen

    1976-01-01

    The importance of a candid evaluation of the departmental chairperson's own performance is discussed. Questions are provided as an aid in probing some of the critical concerns of a departmental staff. (HD)

  12. Treatment planning source assessment

    International Nuclear Information System (INIS)

    Calzetta Larrieu, O.; Blaumann, H.; Longhino, J.

    2000-01-01

    The reactor RA-6 NCT system was improved during the last year mainly in two aspects: the facility itself getting lower contamination factors and using better measurements techniques to obtain lower uncertainties in its characterization. In this job we show the different steps to get the source to be used in the treatment planning code representing the NCT facility. The first one was to compare the dosimetry in a water phantom between the calculation using the entire facility including core, filter and shields and a surface source at the end of the beam. The second one was to transform this particle by particle source in a distribution one regarding the minimum spatial, energy and angular resolution to get similar results. Finally we compare calculation and experimental values with and without the water phantom to adjust the distribution source. The results are discussed. (author)

  13. Institutional and Departmental Cultures: The Relationship Between Teaching and Research.

    Science.gov (United States)

    Austin, Ann E.

    1996-01-01

    The influence of institutional and departmental cultures on the relationship between college teaching and research is discussed, and suggestions for assessing these factors and nurturing a positive relationship between them are made. Approaches include making reward systems more equitable, strengthening administrative leadership, encouraging…

  14. Departmentality

    DEFF Research Database (Denmark)

    Harste, Gorm

    2008-01-01

    a focus on semantic forms in chancellor H.-F. d'Aguesseau's and Fredrick the Great's self-description of power. The overall aim is to study the legacy and the strength of functional differentiation in state formation. How did the separated powers of functional differentiation emerge and how did...

  15. 18 CFR 367.26 - Departmental classification.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Departmental classification. 367.26 Section 367.26 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... ACT General Instructions § 367.26 Departmental classification. Salaries and wages and all other costs...

  16. Flexibility and a Departmental Instructional Planning Model.

    Science.gov (United States)

    Miner, Norris

    The flexibility of an educational program, institution, or system can be described as the ability of the unit to absorb negative responses, such as reductions in funding or enrollments, and continue to function in a viable manner. One approach to adjustment to such reductions is to effect cuts in personnel, current, and equipment spending. This…

  17. A Study of Career Planning Assessments

    OpenAIRE

    Firkola, Peter

    2007-01-01

    This paper provides an overview of career planning assessments. Background on key career concepts is first introduced. A number of career planning assessments are then examined. These assessments included reviewing ones personal history, interest inventories, values assessments, personality assessments, and aptitude tests. The importance and limitations of these career assessments is then discussed.

  18. Current developments in departmental PACS for ultrasound.

    Science.gov (United States)

    Grenier, L E; Eng, P

    1995-01-01

    1. INTRODUCTION TO DEPARTMENTAL PACS. Full or partial Departmental PACS is generally taken to mean an image management system focused on serving the needs of a specific modality or modality application. It will provide a modality specific means of image acquisition, specialized redisplay of images, distribution, and local long term storage of images. A Departmental PACS can be considered in isolation or as a component in a distributed Radiology PACS which consists of one or more departmental work groups on a back bone, potentially with shared resources. 2. DEPARTMENTAL PACS Issues Implementation of a Departmental PACS requires an in-depth knowledge of departmental clinical practice and work flow in all affected areas in the department, including patient intake, image collection, data routing, retrieval of previous image data, reporting, and long term data management and storage. Optimization of modality specific image display systems requires significant involvement from representative physician users. System architectures and user interfaces must be flexible enough to support the span of variation in clinical practice encountered in the site. A departmental PACS should offer a variety of "open" communications interfaces, both local and wide area, recognizing that outreach efforts are often driven by specific imaging departments. Interfaces to other departmental PAC systems and other information systems must be considered in order to facilitate institutions developing "Best of Breed" PACS systems. As hospitals move toward the integrated electronic medical record, means need to exist for a client process launched from a physician desktop to acquire images and/or reports from a departmental system. At minimum, HIS/RIS interfaces need to be considered to minimize re-keying of data and reduce data entry errors. 3. DESIGN OBJECTIVES FOR ALI ULTRAPACS. The key objectives were to design a product which could function either as a free standing PACS or as a departmental

  19. Departmentalization and Twenty-First Century Skills

    Science.gov (United States)

    Watts, Toy Coles

    2012-01-01

    The purpose of this study was to investigate the relationship between school organizational style and student outcomes. The research questions that guided this study were, "Is there a difference in mathematical performance of fourth graders who receive departmentalized instruction as compared to fourth grade students who receive…

  20. The Departmentalization of the ESL Program.

    Science.gov (United States)

    Bolton, John K.

    A review of prevailing patterns of sponsorship of college and university English as a second language (ESL) programs indicates that in community colleges, they tend to be housed in English departments. In four-year institutions they are generally in semi-autonomous units or institutes. The argument for departmental sponsorship is based on data…

  1. A Departmental Cost-Effectiveness Model.

    Science.gov (United States)

    Holleman, Thomas, Jr.

    In establishing a departmental cost-effectiveness model, the traditional cost-effectiveness model was discussed and equipped with a distant and deflation equation for both benefits and costs. Next, the economics of costing was examined and program costing procedures developed. Then, the model construct was described as it was structured around the…

  2. Evaluating the Impact of Departmentalization on Elementary School Students

    Science.gov (United States)

    Chang, Florence C.; Muñoz, Marco A.; Koshewa, Sheila

    2008-01-01

    The increasing accountability demands are leading some districts to departmentalize or consider departmentalizing at the elementary school level (Delviscio & Muffs, 2007). Departmentalization allows teachers to specialize and teach one content area in-depth which may, in turn, lead to higher accountability test scores. Although, due to…

  3. 78 FR 75447 - Senior Executive Service; Departmental Performance Review Board

    Science.gov (United States)

    2013-12-11

    ... DEPARTMENT OF THE TREASURY Senior Executive Service; Departmental Performance Review Board AGENCY: Treasury Department. ACTION: Notice of members of the Departmental Performance Review Board (PRB). SUMMARY: Pursuant to 5 U.S.C. 4314(c)(4), this notice announces the appointment of members of the Departmental PRB...

  4. 76 FR 69798 - Senior Executive Service; Departmental Performance Review Board

    Science.gov (United States)

    2011-11-09

    ... DEPARTMENT OF THE TREASURY Senior Executive Service; Departmental Performance Review Board AGENCY: Treasury Department. ACTION: Notice of members of the Departmental Performance Review Board (PRB). SUMMARY: Pursuant to 5 U.S.C. 4314(c)(4), this notice announces the appointment of members of the Departmental PRB...

  5. Telling Our Story: A Case Study of a Collaborative Departmental Blog at Syracuse University Libraries

    Science.gov (United States)

    Rauh, Anne E.; McReynolds, Stephanie J. H.

    2016-01-01

    This case study will take readers through the planning and publication process of a collaborative departmental library blog at Syracuse University, which is a large private, non-profit research intensive university located in central New York State. It will provide an overview of the history of the project and the mission of the blog. It will…

  6. Basin Assessment Spatial Planning Platform

    Energy Technology Data Exchange (ETDEWEB)

    2017-07-26

    The tool is intended to facilitate hydropower development and water resource planning by improving synthesis and interpretation of disparate spatial datasets that are considered in development actions (e.g., hydrological characteristics, environmentally and culturally sensitive areas, existing or proposed water power resources, climate-informed forecasts). The tool enables this capability by providing a unique framework for assimilating, relating, summarizing, and visualizing disparate spatial data through the use of spatial aggregation techniques, relational geodatabase platforms, and an interactive web-based Geographic Information Systems (GIS). Data are aggregated and related based on shared intersections with a common spatial unit; in this case, industry-standard hydrologic drainage areas for the U.S. (National Hydrography Dataset) are used as the spatial unit to associate planning data. This process is performed using all available scalar delineations of drainage areas (i.e., region, sub-region, basin, sub-basin, watershed, sub-watershed, catchment) to create spatially hierarchical relationships among planning data and drainages. These entity-relationships are stored in a relational geodatabase that provides back-end structure to the web GIS and its widgets. The full technology stack was built using all open-source software in modern programming languages. Interactive widgets that function within the viewport are also compatible with all modern browsers.

  7. Resource assessment/commercialization planning meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-01-24

    The U.S. Department of Energy, Division of Geothermal Energy and Division of Geothermal Resource Management, sponsored a Resource Assessment/Commercialization Planning meeting in Salt Lake City on January 21-24, 1980. The meeting included presentations by state planning and resource teams from all DOE regions. An estimated 130 people representing federal, state and local agencies, industry and private developers attended.

  8. Cultural Assessments and Campaign Planning

    National Research Council Canada - National Science Library

    Gordon, James

    2004-01-01

    .... Cultural assessment is a detailed analysis of factors that influence cultural behavior and a summary of the characteristics of the culture of a given population in relation to proposed military operations...

  9. IRIS Assessment Plan for Uranium (Scoping and Problem Formulation Materials)

    Science.gov (United States)

    In January 2018, EPA released the IRIS Assessment Plan for Uranium (Oral Reference Dose) (Scoping and Problem Formulation Materials). An IRIS Assessment Plan (IAP) communicates to the public the plan for assessing each individual chemical and includes summary informatio...

  10. Life Cycle Assessment in Spatial Planning

    DEFF Research Database (Denmark)

    Bidstrup, Morten; Pizzol, Massimo; Schmidt, Jannick Højrup

    2015-01-01

    Spatial planning establishes conditions for societal patterns of production and consumption. However, the assigned Strategic Environmental Assessments (SEA) tend to have a too narrow focus. In particular, there is a need for applying a system perspective in SEA, extending assessment beyond...... towards operationalising LCA in SEA by adjusting LCA methodology to focus on the ways planners and planning processes can influence the environmental impacts of interconnected activities. The proposed procedure was tested on a case study of Danish extraction planning, and it was found to generate new...... knowledge for decision support. The procedure enabled identification of key systemic impacts, as well as it enabled formulation of recommendations for how to address these impacts in planning processes. On a more general level, this article demonstrates an application of LCA which until now has received...

  11. General Plan Environmental Assessment, Hurlburt Field, Florida

    Science.gov (United States)

    2005-10-01

    sebiferum) and cogon grass (Imperata Resource/Issue Areas Hurlburt Field General Plan Environmental Assessment 4-9 cylindrica) are most...habitat on the western portion of the installation. The restoration of a native long-leaf pine/wire grass community on Hurlburt is associated with a

  12. Assessment of LANL waste minimization plan

    International Nuclear Information System (INIS)

    Davis, K.D.; McNair, D.A.; Jennrich, E.A.; Lund, D.M.

    1991-04-01

    The objective of this report is to evaluate the Los Alamos National Laboratory (LANL) Waste Minimization Plan to determine if it meets applicable internal (DOE) and regulatory requirements. The intent of the effort is to assess the higher level elements of the documentation to determine if they have been addressed rather than the detailed mechanics of the program's implementation. The requirement for a Waste Minimization Plan is based in several DOE Orders as well as environmental laws and regulations. Table 2-1 provides a list of the major documents or regulations that require waste minimization efforts. The table also summarizes the applicable requirements

  13. Subjective risk assessment for planning conservation projects

    International Nuclear Information System (INIS)

    Game, Edward T; Fitzsimons, James A; Lipsett-Moore, Geoff; McDonald-Madden, Eve

    2013-01-01

    Conservation projects occur under many types of uncertainty. Where this uncertainty can affect achievement of a project’s objectives, there is risk. Understanding risks to project success should influence a range of strategic and tactical decisions in conservation, and yet, formal risk assessment rarely features in the guidance or practice of conservation planning. We describe how subjective risk analysis tools can be framed to facilitate the rapid identification and assessment of risks to conservation projects, and how this information should influence conservation planning. Our approach is illustrated with an assessment of risks to conservation success as part of a conservation plan for the work of The Nature Conservancy in northern Australia. Risks can be both internal and external to a project, and occur across environmental, social, economic and political systems. Based on the relative importance of a risk and the level of certainty in its assessment we propose a series of appropriate, project level responses including research, monitoring, and active amelioration. Explicit identification, prioritization, and where possible, management of risks are important elements of using conservation resources in an informed and accountable manner. (letter)

  14. Self-Contained to Departmentalized: How Reading Habits Changed

    Science.gov (United States)

    Lamme, Linda Leonard

    1976-01-01

    Examined the reading habits of four 4th grade classes before and after a changeover from self-contained to departmentalized instruction. Results indicated a slightly lower mean number of books read and far less variation among classes in the number of books read after departmentalization. (JMB)

  15. 75 FR 68669 - Senior Executive Service; Departmental Performance Review Board

    Science.gov (United States)

    2010-11-08

    ... DEPARTMENT OF THE TREASURY Senior Executive Service; Departmental Performance Review Board AGENCY: Treasury Department. ACTION: Notice. SUMMARY: Pursuant to 5 U.S.C. 4314(c)(4), this notice announces the appointment of members of the Departmental PRB. The purpose of this PRB is to review and make recommendations...

  16. 75 FR 68668 - Senior Executive Service; Departmental Performance Review Board

    Science.gov (United States)

    2010-11-08

    ... DEPARTMENT OF THE TREASURY Senior Executive Service; Departmental Performance Review Board AGENCY: Treasury Department. ACTION: Notice of members of the Departmental Offices Performances Review Board. SUMMARY: Pursuant to 5 U.S.C. 4314(c)(4), this notice announces the appointment of members of the...

  17. Enterprise imaging and multi-departmental PACS

    International Nuclear Information System (INIS)

    Bergh, Bjoern

    2006-01-01

    The aim of this review is to present the status of digital image acquisition and archiving outside of radiology and to describe the technical concepts and possibilities of how a ''radiology'' Picture Archiving and Communication System (PACS) can become a multi-departmental (MD-)PACS. First the principles of system integration technology are explained and illustrated by the description of a typical radiology system integration. Then four types of modality integration approaches are defined: the direct modality integration (Type-I), the integration via DICOM acquisition software (Type-II) the integration via specialised systems either with (Type-III) or without PACS connection (Type-IV). The last section is dedicated to the presentation of the PACS requirements of selected interdisciplinary modality types [Endoscopy, Ultrasound and Electrocardiography (ECG)] and clinical disciplines (Pathology, Dermatology, Ophthalmology and Cardiology), which are then compared with the technical possibilities of a MD-PACS. (orig.)

  18. Hurricane Sandy science plan: coastal impact assessments

    Science.gov (United States)

    Stronko, Jakob M.

    2013-01-01

    Hurricane Sandy devastated some of the most heavily populated eastern coastal areas of the Nation. With a storm surge peaking at more than 19 feet, the powerful landscape-altering destruction of Hurricane Sandy is a stark reminder of why the Nation must become more resilient to coastal hazards. In response to this natural disaster, the U.S. Geological Survey (USGS) received a total of $41.2 million in supplemental appropriations from the Department of the Interior (DOI) to support response, recovery, and rebuilding efforts. These funds support a science plan that will provide critical scientific information necessary to inform management decisions for recovery of coastal communities, and aid in preparation for future natural hazards. This science plan is designed to coordinate continuing USGS activities with stakeholders and other agencies to improve data collection and analysis that will guide recovery and restoration efforts. The science plan is split into five distinct themes: coastal topography and bathymetry, impacts to coastal beaches and barriers, impacts of storm surge, including disturbed estuarine and bay hydrology, impacts on environmental quality and persisting contaminant exposures, impacts to coastal ecosystems, habitats, and fish and wildlife. This fact sheet focuses assessing impacts to coastal beaches and barriers.

  19. Data-Driven Planning: Using Assessment in Strategic Planning

    Science.gov (United States)

    Bresciani, Marilee J.

    2010-01-01

    Data-driven planning or evidence-based decision making represents nothing new in its concept. For years, business leaders have claimed they have implemented planning informed by data that have been strategically and systematically gathered. Within higher education and student affairs, there may be less evidence of the actual practice of…

  20. Planning for land use and conservation: Assessing GIS-based conservation software for land use planning

    Science.gov (United States)

    Rob Baldwin; Ryan Scherzinger; Don Lipscomb; Miranda Mockrin; Susan Stein

    2014-01-01

    Recent advances in planning and ecological software make it possible to conduct highly technical analyses to prioritize conservation investments and inform local land use planning. We review these tools, termed conservation planning tools, and assess the knowledge of a key set of potential users: the land use planning community. We grouped several conservation software...

  1. Salton Sea ecosystem monitoring and assessment plan

    Science.gov (United States)

    Case(compiler), H. L.; Boles, Jerry; Delgado, Arturo; Nguyen, Thang; Osugi, Doug; Barnum, Douglas A.; Decker, Drew; Steinberg, Steven; Steinberg, Sheila; Keene, Charles; White, Kristina; Lupo, Tom; Gen, Sheldon; Baerenklau, Ken A.

    2013-01-01

    The Salton Sea, California’s largest lake, provides essential habitat for several fish and wildlife species and is an important cultural and recreational resource. It has no outlet, and dissolved salts contained in the inflows concentrate in the Salton Sea through evaporation. The salinity of the Salton Sea, which is currently nearly one and a half times the salinity of ocean water, has been increasing as a result of evaporative processes and low freshwater inputs. Further reductions in inflows from water conservation, recycling, and transfers will lower the level of the Salton Sea and accelerate the rate of salinity increases, reduce the suitability of fish and wildlife habitat, and affect air quality by exposing lakebed playa that could generate dust. Legislation enacted in 2003 to implement the Quantification Settlement Agreement (QSA) stated the Legislature’s intent for the State of California to undertake the restoration of the Salton Sea ecosystem. As required by the legislation, the California Resources Agency (now California Natural Resources Agency) produced the Salton Sea Ecosystem Restoration Study and final Programmatic Environmental Impact Report (PEIR; California Resources Agency, 2007) with the stated purpose to “develop a preferred alternative by exploring alternative ways to restore important ecological functions of the Salton Sea that have existed for about 100 years.” A decision regarding a preferred alternative currently resides with the California State Legislature (Legislature), which has yet to take action. As part of efforts to identify an ecosystem restoration program for the Salton Sea, and in anticipation of direction from the Legislature, the California Department of Water Resources (DWR), California Department of Fish and Wildlife (CDFW), U.S. Bureau of Reclamation (Reclamation), and U.S. Geological Survey (USGS) established a team to develop a monitoring and assessment plan (MAP). This plan is the product of that effort. The

  2. Living the Plan: Strategic Planning Aligned with Practice and Assessment

    Science.gov (United States)

    Sullivan, Timothy M.; Richardson, Emily C.

    2011-01-01

    The purpose of this article is to provide leaders of continuing education enterprises with an integrated model for sustaining strategic planning initiatives. Global economic conditions, shifting competitive forces, continuing calls for accountability, and dramatic changes in institutional funding streams contribute to an environment characterized…

  3. The thematic plant life assessment network (PLAN)

    Energy Technology Data Exchange (ETDEWEB)

    Hurst, R.C.; McGarry, D. [EC/JRC Institute for Advanced Materials, Petten (Netherlands); Pedersen, H.H. [Brite Euram DG XII, Brussels (Belgium)

    1998-12-31

    The Plant Life Assessment Network (PLAN) is a Brite Euram Type II Thematic Network, initiated by the European Commission to facilitate structured co-operation between all cost shared action projects already funded by the Commission which fall under this common technical theme. The projects involved address a multiplicity of problems associated with plant life assessment and are drawn from Brite-Euram, Standards, Measurement and Testing, Nuclear Fission Safety and Esprit EC programmes. The main aim of the Network is to initiate, maintain and monitor a fruitful co-operation process between completed, ongoing and future EC R and D projects, thereby promoting improved cross fertilization and enhanced industrial exploitation of R and D results. As the project is in its infancy, this presentation covers the background to the initiative in some detail. In particular two key aspects are highlighted, namely, the requirement of the EC to launch such a network in the area of plant life assessment including its evolution from two small Thematic Research Actions and, secondly, the mechanism for structuring the Network in an ordered and proven way along the lines of the EC/JRC European Networks, PISC, NESC, AMES, ENIQ, ENAIS and EPERC. The operating and financial structure of the Network is detailed with reference made to the role of the executive Steering Committee, The Network Project Leader and the Network Financial Co-ordinator. Each of the 58 projects involved in the Network, representing a wide range of industrial sectors and disciplines, is distributed in terms of their efforts between 4 disciplinary Clusters covering Inspection, Instrumentation and Monitoring, Structural Mechanics and Maintenance. For each of these Clusters, an expert has been appointed as a Project Technical Auditor to support the elected Cluster Co-ordinator to define Cluster Tasks, which contribute to the overall objectives of the project. From the Project Representatives, Cluster Task Leaders and

  4. The thematic plant life assessment network (PLAN)

    Energy Technology Data Exchange (ETDEWEB)

    Hurst, R C; McGarry, D [EC/JRC Institute for Advanced Materials, Petten (Netherlands); Pedersen, H H [Brite Euram DG XII, Brussels (Belgium)

    1999-12-31

    The Plant Life Assessment Network (PLAN) is a Brite Euram Type II Thematic Network, initiated by the European Commission to facilitate structured co-operation between all cost shared action projects already funded by the Commission which fall under this common technical theme. The projects involved address a multiplicity of problems associated with plant life assessment and are drawn from Brite-Euram, Standards, Measurement and Testing, Nuclear Fission Safety and Esprit EC programmes. The main aim of the Network is to initiate, maintain and monitor a fruitful co-operation process between completed, ongoing and future EC R and D projects, thereby promoting improved cross fertilization and enhanced industrial exploitation of R and D results. As the project is in its infancy, this presentation covers the background to the initiative in some detail. In particular two key aspects are highlighted, namely, the requirement of the EC to launch such a network in the area of plant life assessment including its evolution from two small Thematic Research Actions and, secondly, the mechanism for structuring the Network in an ordered and proven way along the lines of the EC/JRC European Networks, PISC, NESC, AMES, ENIQ, ENAIS and EPERC. The operating and financial structure of the Network is detailed with reference made to the role of the executive Steering Committee, The Network Project Leader and the Network Financial Co-ordinator. Each of the 58 projects involved in the Network, representing a wide range of industrial sectors and disciplines, is distributed in terms of their efforts between 4 disciplinary Clusters covering Inspection, Instrumentation and Monitoring, Structural Mechanics and Maintenance. For each of these Clusters, an expert has been appointed as a Project Technical Auditor to support the elected Cluster Co-ordinator to define Cluster Tasks, which contribute to the overall objectives of the project. From the Project Representatives, Cluster Task Leaders and

  5. Assessment of LANL waste management site plan

    International Nuclear Information System (INIS)

    Black, R.L.; Davis, K.D.; Hoevemeyer, S.S.; Jennrich, E.A.; Lund, D.M.

    1991-04-01

    The objective of this report is to present findings from evaluating the Los Alamos National Laboratory (LANL) Waste Management Plan to determine if it meets applicable DOE requirements. DOE Order 5820.2A, Radioactive Waste Management, sets forth requirements and guidelines for the establishment of a Waste Management Plan. The primary purpose of a Waste Management Plan is to describe how waste operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming year

  6. Quality Management Plan for the Environmental Assessment and Innovation Division

    Science.gov (United States)

    Quality management plan (QMP) which identifies the mission, roles, responsibilities of personnel with regard to quality assurance and quality management for the environmental assessment and innovation division.

  7. 24 CFR 401.421 - Rental Assistance Assessment Plan.

    Science.gov (United States)

    2010-04-01

    ... PROGRAM (MARK-TO-MARKET) Restructuring Plan § 401.421 Rental Assistance Assessment Plan. (a) Plan required..., comparable, and affordable housing in the local market; (2) The types of tenants residing in the project (such as elderly families, disabled families, large families, and cooperative homeowners); (3) The local...

  8. Environmental impact assessment applied to planning activities

    International Nuclear Information System (INIS)

    Vismara, R.

    1994-01-01

    Object of EEC (European Economic Community) directive and italian law are certain public and private projects. However, more recent tendency are moving to an application on planning action too. There is no doubt that EIA (Environmental Impact Analysis) on project is very different than EIA on plans. Obviously EIA on a sectorial plan is not an addition of singular EIA on project. The new main objectives shall be: identification of critical areas; identification of interaction between different projects and between different factors; identification of critical project. A methodology to quantify these objectives in matricial form is presented

  9. GPS adjacent-band compatibility assessment plan.

    Science.gov (United States)

    2012-12-01

    The Federal Aviation Administration (FAA) and the Research and Innovative Technology : Administration (RITA), both operating Administrations of the DOT, developed this Plan to : provide the framework for definition of the processes and assumptions th...

  10. Student Affairs Assessment, Strategic Planning, and Accreditation

    Science.gov (United States)

    Fallucca, Amber

    2017-01-01

    This chapter illustrates how student affairs units participate in accreditation across regional agency expectations and program-level requirements. Strategies for student affairs units to engage in campus strategic planning processes to further highlight their contributions are also recommended.

  11. Hospital evacuation; planning, assessment, performance and evaluation

    OpenAIRE

    Nero C Wabo; P Örtenwall; A Khorram-Manesh

    2012-01-01

    Objective: Malfunction in hospitals' complex internal systems, or extern threats, may result in a hospital evacuation. Factors contributing to such evacuation must be identified, analyzed and action plans should be prepared. Our aims in this study were 1) to evaluate the use of risk and vulnerability analysis as a basis for hospital evacuation plan, 2) to identify risks/hazards triggering an evacuation and evaluate the respond needed and 3) to propose a template with main key points for plann...

  12. Assessment of the 2004 Danish National Action Plan for Emplyment

    DEFF Research Database (Denmark)

    Emerek, Ruth

    The report gives the economic, employment and policy context for the National Action Plan for employment, and assess the NAP from a gender persepctive......The report gives the economic, employment and policy context for the National Action Plan for employment, and assess the NAP from a gender persepctive...

  13. Energy performance assessment in urban planning competitions

    International Nuclear Information System (INIS)

    Eicker, Ursula; Monien, Dirk; Duminil, Éric; Nouvel, Romain

    2015-01-01

    Highlights: • Quantification of energy efficiency in urban planning. • Analysis based on 3D (city) model. • Impact evaluation of urban form on energy demand, supply and building costs. • Primary energy balance with and without inclusion of shadowing effects. - Abstract: Many cities today are committed to increase the energy efficiency of buildings and the fraction of renewables especially in new urban developments. However, quantitative data on building energy performance as a function of urban density, building compactness and orientation, building use and supply options are rarely available during the design of new cities or early scenario analysis for existing city quarters, making it difficult for cities to effectively evaluate which concepts work today and in the future. The paper proposes a methodology to assess the energy demand and supply options as a function of the availability of geometry, building standard and use data. An automated procedure was implemented to identify each building’s geometry and volume and transfer the information to a simulation tool, which then calculates heating demand and solar energy generation on roofs and facades. The simulation includes shading calculations for each segment of the façades and roofs and thus allows a very detailed quantification of the building energy demand. By applying the methodology to a case study city quarter designed in an urban competition in Munich, it could be shown how the urban design influences the energy demand of the quarter and which fractions of renewable energy can be integrated into the roofs. While the building insulation standard and use are the is most important criteria for building energy efficiency (with an impact of more than a factor 2), the exact geometrical form, compactness and urban shading effects influences the energy demand by 10–20%. On the other hand, the detailed roof geometry and orientation influences the possible solar coverage of electricity or thermal

  14. Performance Assessment Strategy Plan for the Geologic Repository Program

    International Nuclear Information System (INIS)

    1990-01-01

    Performance assessment is a major constituent of the program being conducted by the US Department of Energy (DOE) to develop a geologic repository. Performance assessment is the set of activities needed for quantitative evaluations to assess compliance with the performance requirements in the regulations for a geologic repository and to support the development of the repository. The strategy for these evaluations has been documented in the Performance Assessment Strategy Plan (DOE, 1989). The implementation of the performance assessment strategy is defined in this document. This paper discusses the scope and objectives of the implementation plan, the relationship of the plan to other program plans, summarizes the performance assessment areas and the integrated strategy of the performance assessment program. 1 fig., 3 tabs

  15. The Role of Departmental Leadership for Professional Learning Communities

    Science.gov (United States)

    Vanblaere, Bénédicte; Devos, Geert

    2018-01-01

    Purpose: Department heads play a pivotal role in the functioning of departments in secondary schools. However, quantitative research about the role of departmental leadership for the development of professional learning communities (PLCs) in subject departments in secondary schools remains scarce. As PLCs are seen as promising contexts for…

  16. 31 CFR Appendix A to Subpart C of... - Departmental Offices

    Science.gov (United States)

    2010-07-01

    ... requests to amend records for records maintained by the Departmental Offices will be made by the head of... Treasury, Room 3000, Main Treasury Building, 1500 Pennsylvania Avenue, NW., Washington, DC 20220. 7. Annual... guardian of any individual will be required to provide adequate proof of legal relationship before such...

  17. Elementary School Organization: Self-Contained and Departmentalized Classroom Structures.

    Science.gov (United States)

    Des Moines Public Schools, IA.

    Surveys were conducted to investigate contemporary thought regarding organizational practices at the elementary level, with particular attention to identifying the extent to which departmentalization was supported by research and actually employed in 24 elementary schools in the Midwest and in 41 Des Moines elementary schools. Four committees…

  18. Pre-Service Teachers' Perceptions of Departmentalization of Elementary Schools

    Science.gov (United States)

    Liu, Fuchang

    2011-01-01

    This paper discusses the advantages and disadvantages of departmentalization of elementary schools, with an emphasis on teaching mathematics, as perceived by preservice teachers who shared their opinions through online discussion. Advantages include teachers' enthusiasm about and focused attention on the specialized area and students' easier…

  19. Interdisciplinary Team Teaching versus Departmentalization in Middle Schools.

    Science.gov (United States)

    Alspaugh, John W.; Harting, Roger D.

    1998-01-01

    Studied the effects of interdisciplinary teaming versus departmentalization on student achievement in middle schools. Found no significant differences for reading, math, science, and social studies achievement. Results suggest that team teaching merits further investigation as a potential strategy for mediating the student achievement loss…

  20. Faculty Agency: Departmental Contexts That Matter in Faculty Careers

    Science.gov (United States)

    Campbell, Corbin M.; O'Meara, KerryAnn

    2014-01-01

    In a modern context of constrained resources and high demands, faculty exert agency to strategically navigate their careers (Baez 2000a; Neumann et al. 2006). Guided by the O'Meara et al. (2011) framework on agency in faculty professional lives, this study used Structural Equation Modeling to investigate which departmental factors…

  1. Assessing Cultural Competency in School Crisis Plans

    Science.gov (United States)

    Annandale, Neil O.; Heath, Melissa Allen; Dean, Brenda; Kemple, Ana; Takino, Yozo

    2011-01-01

    This study reviewed school-based crisis planning resources and guidelines provided by 40 state departments of education and offices of safe and drug-free schools. Content was examined for indications of cultural competency. The most frequently reported topics included: (a) assisting students with mental and physical disabilities, (b) tapping into…

  2. Assessing the Impact of Planned Social Change

    Science.gov (United States)

    Campbell, Donald T.

    2011-01-01

    It is a special characteristic of all modern societies that people consciously decide on and plan projects designed to improve their social systems. It is their universal predicament that their projects do not always have their intended effects. It seems inevitable that in most countries this common set of problems, combined with the obvious…

  3. Developing and assessing accident management plans for nuclear power plants

    International Nuclear Information System (INIS)

    Hanson, D.J.; Johnson, S.P.; Blackman, H.S.; Stewart, M.A.

    1992-07-01

    This document is the second of a two-volume NUREG/CR that discusses development of accident management plans for nuclear power plants. The first volume (a) describes a four-phase approach for developing criteria that could be used for assessing the adequacy of accident management plans, (b) identifies the general attributes of accident management plans (Phase 1), (c) presents a prototype process for developing and implementing severe accident management plans (Phase 2), and (d) presents criteria that can be used to assess the adequacy of accident management plans. This volume (a) describes results from an evaluation of the capabilities of the prototype process to produce an accident management plan (Phase 3) and (b), based on these results and preliminary criteria included in NUREG/CR-5543, presents modifications to the criteria where appropriate

  4. Readiness Assessment Plan, Hanford 200 areas treated effluent disposal facilities

    International Nuclear Information System (INIS)

    Ulmer, F.J.

    1995-01-01

    This Readiness Assessment Plan documents Liquid Effluent Facilities review process used to establish the scope of review, documentation requirements, performance assessment, and plant readiness to begin operation of the Treated Effluent Disposal system in accordance with DOE-RLID-5480.31, Startup and Restart of Facilities Operational Readiness Review and Readiness Assessments

  5. Assessment report for Hanford analytical services quality assurance plan

    International Nuclear Information System (INIS)

    Taylor, L.H.

    1994-11-01

    This report documents the assessment results of DOE/RL-94-55, Hanford Analytical Services Quality Assurance Plan. The assessment was conducted using the Requirement and Self-Assessment Database (RSAD), which contains mandatory and nonmandatory DOE Order statements for the relevant DOE orders

  6. R7 VU Born-Assessed Demo Plan

    Energy Technology Data Exchange (ETDEWEB)

    Robert Nourgaliev

    2010-02-01

    This is an initial draft of a born-assessed VU plan for the RELAP7 (R7) code development effort. The plan will continue to evolve based on the growth of code capability. This growth will be reflected as additional testing is identified and done. Later versions of this document will reflect that growth.

  7. Assessment and treatment of planning skills in adolescents with ADHD

    NARCIS (Netherlands)

    Boyer, B.E.

    2016-01-01

    Planning problems are described to be prominent in the daily lives of adolescents with ADHD (Barkley, 2004) and may cause comorbid conditions and impairments (Safren, 2006). Therefore the central aim of this thesis was to assess planning skills of adolescents with ADHD and to investigate whether

  8. Integrating Planning, Assessment, and Improvement in Higher Education

    Science.gov (United States)

    Sherlock, Barbara J.

    2009-01-01

    Based on Penn State's popular "Innovation Insights" series, this book brings together in one handy reference nearly a decade of tried and true insights into continuous quality improvements in higher education. Their five-step model for integrating planning, assessment, and improvement moves plans off the shelf and into the weekly and daily…

  9. Environmental impact assessment based on planning support system

    NARCIS (Netherlands)

    Carsjens, G.J.; Chen, W.

    2011-01-01

    How to assess environmental impact is one of the keys in land use planning. This article described in detail the concepts of activities, impact zones, functions, and sensitivities, as well as the development of STEPP (strategic tool for integrating environmental aspects in planning procedures) based

  10. Plans for Hand-Held/Portable Oil Assessment Devices

    National Research Council Canada - National Science Library

    Urbansky, Edward

    2005-01-01

    At the request of the U.S. Army Oil Analysis Program, the JOAP TSC conducted a market study, assembled a plan of action, and prepared a worksheet for the evaluation of portable or hand-held oil assessment devices...

  11. Assessment Of Knowledge And Attitude Towards Family Planning ...

    African Journals Online (AJOL)

    Assessment Of Knowledge And Attitude Towards Family Planning Among Selected ... Among reasons for low uptake is religious belief on procreation. ... leaders as a change agent by the stakeholders to increase the uptake and use of family ...

  12. Socioeconomic assessment: issues, status, and plans

    International Nuclear Information System (INIS)

    Boryczka, M.K.

    1983-01-01

    Numerous public meetings and hearings have been held in Texas, Mississippi, Louisiana and Utah on the issue of siting a nuclear waste repository in salt. Citizens in these potential site areas have raised many questions about how this facility will affect their quality of life. Questions about population and economic changes have been of particular concern. In developing a socioeconomic program, these issues and others have been an integral part of Battelle's socioeconomic studies. The three elements of Battelle's socioeconomic program are comprised of three elements: impact assessment, impact mitigation and community development, and impact monitoring. In addition, our approach to assessing socioeconomic impacts for the environmental assessment (EA) required by the Nuclear Waste Policy Act of 1982 are described. Since the EA analysis will address many of the issues raised in the site areas, these concerns will be elaborated on. Finally, various techniques for managing socioeconomic impacts will be presented. 6 references, 1 figure

  13. Assessing ecological sustainability in urban planning - EcoBalance model

    Energy Technology Data Exchange (ETDEWEB)

    Wahlgren, I., Email: irmeli.wahlgren@vtt.fi

    2012-06-15

    Urban planning solutions and decisions have large-scale significance for ecological sustainability (eco-efficiency) the consumption of energy and other natural resources, the production of greenhouse gas and other emissions and the costs caused by urban form. Climate change brings new and growing challenges for urban planning. The EcoBalance model was developed to assess the sustainability of urban form and has been applied at various planning levels: regional plans, local master plans and detailed plans. The EcoBalance model estimates the total consumption of energy and other natural resources, the production of emissions and wastes and the costs caused directly and indirectly by urban form on a life cycle basis. The results of the case studies provide information about the ecological impacts of various solutions in urban development. (orig.)

  14. Coaxing and Persuading: Making Rigorous History Teaching a Departmental Reality

    Science.gov (United States)

    Arscott, Rachel; Hinks, Tom

    2016-01-01

    Faced with the introduction of a two-year key stage and a new whole-school assessment policy, Rachel Arscott and Tom Hinks decided to make a virtue out of necessity and reconsider their whole approach to planning, teaching and assessment at Key Stage 3. In this article they give an account of the process of reflection and revision they undertook…

  15. Risk assessment for biodiversity conservation planning in Pacific Northwest forests

    Science.gov (United States)

    Becky K. Kerns; Alan Ager

    2007-01-01

    Risk assessment can provide a robust strategy for landscape-scale planning challenges associated with species conservation and habitat protection in Pacific Northwest forests. We provide an overview of quantitative and probabilistic ecological risk assessment with focus on the application of approaches and influences from the actuarial, financial, and technical...

  16. 76 FR 54195 - 2010 Resources Planning Act (RPA) Assessment Draft

    Science.gov (United States)

    2011-08-31

    ... Resources Planning Act (RPA) Assessment is available for review and comment at http://www.fs.fed.us/research... facsimile to 703-605-5131 or by email using the comment form on the Web site http://www.fs.fed.us/research... . Additional information about the RPA Assessment can be obtained on the Internet at http://www.fs.fed.us...

  17. Writing Information Literacy Assessment Plans: A Guide to Best Practice

    Directory of Open Access Journals (Sweden)

    Megan Oakleaf

    2010-03-01

    Full Text Available Academic librarians throughout higher education add value to the teaching and learning missions of their institutions though information literacy instruction. To demonstrate the full impact of librarians on students in higher education, librarians need comprehensive information literacy assessment plans, composed of instructional program-level and outcome-level components, that summarize the purpose of information literacy assessment, emphasize the theoretical basis of their assessment efforts, articulate specific information literacy goals and outcomes, describe the major assessment methods and tools used to capture evidence of student learning, report assessment results, and highlight improvements made as a consequence of learning assessment.

  18. Double-shell tank waste transfer facilities integrity assessment plan

    International Nuclear Information System (INIS)

    Hundal, T.S.

    1998-01-01

    This document presents the integrity assessment plan for the existing double-shell tank waste transfer facilities system in the 200 East and 200 West Areas of Hanford Site. This plan identifies and proposes the integrity assessment elements and techniques to be performed for each facility. The integrity assessments of existing tank systems that stores or treats dangerous waste is required to be performed to be in compliance with the Washington State Department of Ecology Dangerous Waste Regulations, Washington Administrative Code WAC-173-303-640 requirements

  19. Performance assessment plans and methods for the Salt Repository Project

    International Nuclear Information System (INIS)

    1984-08-01

    This document presents the preliminary plans and anticipated methods of the Salt Repository Project (SRP) for assessing the postclosure and radiological aspects of preclosure performance of a nuclear waste repository in salt. This plan is intended to be revised on an annual basis. The emphasis in this preliminary effort is on the method of conceptually dividing the system into three subsystems (the very near field, the near field, and the far field) and applying models to analyze the behavior of each subsystem and its individual components. The next revision will contain more detailed plans being developed as part of Site Characterization Plan (SCP) activities. After a brief system description, this plan presents the performance targets which have been established for nuclear waste repositories by regulatory agencies (Chapter 3). The SRP approach to modeling, including sensitivity and uncertainty techniques is then presented (Chapter 4). This is followed by a discussion of scenario analysis (Chapter 5), a presentation of preliminary data needs as anticipated by the SRP (Chapter 6), and a presentation of the SRP approach to postclosure assessment of the very near field, the near field, and the far field (Chapters 7, 8, and 9, respectively). Preclosure radiological assessment is discussed in Chapter 10. Chapter 11 presents the SRP approach to code verification and validation. Finally, the Appendix lists all computer codes anticipated for use in performance assessments. The list of codes will be updated as plans are revised

  20. Sanitary landfill groundwater quality assessment plan Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Wells, D.G.; Cook, J.W.

    1990-06-01

    This assessment monitoring plan has been prepared in accordance with the guidance provided by the SCDHEC in a letter dated December 7, 1989 from Pearson to Wright and a letter dated October 9, 1989 from Keisler to Lindler. The letters are included a Appendix A, for informational purposes. Included in the plan are all of the monitoring data from the landfill monitoring wells for 1989, and a description of the present monitoring well network. The plan proposes thirty-two new wells and an extensive coring project that includes eleven soil borings. Locations of the proposed wells attempt to follow the SCDHEC guidelines and are downgradient, sidegradient and in the heart of suspected contaminant plumes. Also included in the plan is the current Savannah River Site Sampling and Analysis Plan and the well construction records for all of the existing monitoring wells around the sanitary landfill.

  1. 1998: BMBF expenditures for energy research. Draft of the departmental federal budget No. 30

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    Departmental budget No. 30 in the 1998 draft federal budget covers the activities of the Federal Ministry for Education, Science, Research and Technology (BMBF). Its level of DM 14 950 million represents a 0,9% increase from the funds earmarked for the current year of 1997. DM 70 million is to be spent on safety research for nuclear plants, and DM 228 million has been planned for decommissioning and demolition of nuclear experimental and demonstration plants. The operation of, and investments into, the research centers are funded to the tune of DM 1307 million and DM 339 million, respectively. Institutions of basic research will receive DM 434 million, and renewable energies, economical energy uses, conversion and combustion technologies will be funded in the amount of DM 238 million. (orig.) [de

  2. A systematic process for developing and assessing accident management plans

    International Nuclear Information System (INIS)

    Hanson, D.J.; Blackman, H.S.; Meyer, O.R.; Ward, L.W.

    1991-04-01

    This document describes a four-phase approach for developing criteria recommended for use in assessing the adequacy of nuclear power plant accident management plans. Two phases of the approach have been completed and provide a prototype process that could be used to develop an accident management plan. Based on this process, a preliminary set of assessment criteria are derived. These preliminary criteria will be refined and improved when the remaining steps of the approach are completed, that is, after the prototype process is validated through application. 9 refs., 10 figs., 7 tabs

  3. Planning Support Systems (PSS-Based Spatial Plan Alternatives and Environmental Assessment

    Directory of Open Access Journals (Sweden)

    Hee-Sun Choi

    2016-03-01

    Full Text Available Spatial planning is at the core of national land and urban development. Many countries and cities seek sustainable development through various means such as coordinated environmental planning, environmental assessment, and internalization of environmental analysis and planning. A Planning Support System (PSS is a GIS (Geographic Information System-based, spatial decision-making support system that incorporates a variety of theories and pertinent models. This study adopted the “What if?” model to design an alternative spatial plan that includes generation of predictive scenarios and is relatively easy to use. In the cities studied, we identified a total of six scenarios based on the main drivers of development—namely, population and spatial policies. Subsequently, we assessed the alternatives for their environmental impact, preparing sensitivity maps for each major environmental issue in the target area (natural ecosystem, air and microclimate, natural disasters. One projected advantage of the “What if?” model is that its digital visualization of proposed plans may improve public awareness and involvement. Furthermore, the tool is expected to be highly useful in ensuring the objectivity of quantitative analyses. However, it is necessary to develop a PSS that is both standardized and tailored to the particular needs of each area. Finally, the development of an e-governance system will be beneficial in ensuring public access to the decision making process.

  4. Career Assessment and Planning Strategies for Postsecondary Students with Disabilities

    Science.gov (United States)

    Roessler, Richard T.; Hennessey, Mary L.; Hogan, Ebony M.; Savickas, Suzanne

    2009-01-01

    Career assessment and planning services that enable students with disabilities to make successful transitions from higher education to careers are an important component often missing in the postsecondary educational experience. Comprehensive services in this regard involve students in considering how to incorporate their preferences, assets, and…

  5. Quality Assessment of Family Planning Services in Ife/Ijesa ...

    African Journals Online (AJOL)

    Context: Medical audit in healthcare has a goal to monitor and upgrade the standard of health care in a setting. Whether a client will accept, use effectively and continue to practice contraception depends on the quality of services rendered. Objective: To assess the quality of our family planning services as perceived by our ...

  6. Planning Intervention Using Dynamic Assessments: A Case Study

    Science.gov (United States)

    Hasson, Natalie; Dodd, Barbara

    2014-01-01

    Dynamic assessments (DA) of language have been shown to be a useful addition to the battery of tests used to diagnose language impairments in children, and to evaluate their skills. The current article explores the value of the information gained from a DA in planning intervention for a child with language impairment. A single case study was used…

  7. Clinical Significance: a Therapeutic Approach Topsychological Assessment in Treatment Planning

    Directory of Open Access Journals (Sweden)

    Afolabi Olusegun Emmanuel

    2015-06-01

    Full Text Available Psychological assessment has long been reported as a key component of clinical psychology. This paper examines the complexities surrounding the clinical significance of therapeutic approach to treatment planning. To achieve this objective, the paper searched and used the PsycINFO and PubMed databases and the reference sections of chapters and journal articles to analysed, 1 a strong basis for the usage of therapeutic approach to psychological assessment in treatment plans, 2 explained the conceptual meaning of clinical significant change in therapeutic assessment, 3 answered some of the questions regarding practicability and the clinical significance of therapeutic approach to treatment plans, particularly during or before treatment, 4 linked therapeutic assessment to change in clients’ clinical impression, functioning and therapeutic needs 5 analysed the empirically documenting clinically significant change in therapeutic assessment. Finally, the study suggested that though therapeutic assessment is not sufficient for the systematic study of psychotherapy outcome and process, it is still consistent with both the layman and professional expectations regarding treatment outcome and also provides a precise method for classifying clients as ‘changed’ or ‘unchanged’ on the basis of clinical significance criteria.

  8. Planning for exercises of the Federal Radiological Monitoring and Assessment Plan

    International Nuclear Information System (INIS)

    Adler, M.V.

    1985-11-01

    This report is to be used in planning radiological emergency exercises to test the Federal Radiological Monitoring and Assessment Plan (FRMAP). Although developed for this specific purpose, the document also contains material that may be useful for planning other types of exercises. This report describes the types of exercises that might be used, the steps in planning and conducting the exercises, and the special considerations required for exercises to test the FRMAP. FRMAP exercises typically involve several federal and state agencies. General and specific objectives that could guide these exercises, as well as the possible activities of all the participants - players, controllers, and evaluators - are discussed. The resources that each participating federal agency might provide during an exercise are listed

  9. Peer Review Plan for OPPT Work Plan Risk Assessment of 1 - Bromopropane (“1 - BP”)

    Science.gov (United States)

    This document outlines the peer review plan for a risk assessment which addresses occupational uses of 1-BP in dry-cleaning and foam gluing operations, consumer uses in aerosol solvent cleaners and spray adhesives, and its effects on human health.

  10. AVLIS Production Plant Preliminary Quality Assurance Plan and Assessment

    International Nuclear Information System (INIS)

    1984-01-01

    This preliminary Quality Assurance Plan and Assessment establishes the Quality Assurance requirements for the AVLIS Production Plant Project. The Quality Assurance Plan defines the management approach, organization, interfaces, and controls that will be used in order to provide adequate confidence that the AVLIS Production Plant design, procurement, construction, fabrication, installation, start-up, and operation are accomplished within established goals and objectives. The Quality Assurance Program defined in this document includes a system for assessing those elements of the project whose failure would have a significant impact on safety, environment, schedule, cost, or overall plant objectives. As elements of the project are assessed, classifications are provided to establish and assure that special actions are defined which will eliminate or reduce the probability of occurrence or control the consequences of failure. 8 figures, 18 tables

  11. Using the Program Sustainability Assessment Tool to Assess and Plan for Sustainability

    Science.gov (United States)

    Mainor, Avia; Moreland-Russell, Sarah; Maier, Ryan C.; Brossart, Laura; Luke, Douglas A.

    2014-01-01

    Implementing and growing a public health program that benefits society takes considerable time and effort. To ensure that positive outcomes are maintained over time, program managers and stakeholders should plan and implement activities to build sustainability capacity within their programs. We describe a 3-part sustainability planning process that programs can follow to build their sustainability capacity. First, program staff and stakeholders take the Program Sustainability Assessment Tool to measure their program’s sustainability across 8 domains. Next, managers and stakeholders use results from the assessment to inform and prioritize sustainability action planning. Lastly, staff members implement the plan and keep track of progress toward their sustainability goals. Through this process, staff can more holistically address the internal and external challenges and pressures associated with sustaining a program. We include a case example of a chronic disease program that completed the Program Sustainability Assessment Tool and engaged in program sustainability planning. PMID:24456644

  12. Linking global scenarios to national assessments: Experiences from the Resources Planning Act (RPA) Assessment

    Science.gov (United States)

    Linda L. Langner; Peter J. Ince

    2012-01-01

    The Resources Planning Act (RPA) Assessment provides a nationally consistent analysis of the status and trends of the Nation's renewable forest resources. A global scenario approach was taken for the 2010 RPA Assessment to provide a shared world view of potential futures. The RPA Assessment scenarios were linked to the global scenarios and climate projections used...

  13. Research Quality Assessment and Planning Journals. The Italian Perspective.

    Directory of Open Access Journals (Sweden)

    Bruno Zanon

    2014-02-01

    Full Text Available Assessment of research products is a crucial issue for universities and research institutions faced with internationalization and competition. Disciplines are reacting differently to this challenge, and planning, in its various forms – from urban design to process­oriented sectors – is under strain because the increasingly common assessment procedures based on the number of articles published in ranked journals and on citation data are not generally accepted. The reputation of journals, the impact of publications, and the profiles of scholars are increasingly defined by means of indexes such as impact factor and citations counts, but these metrics are questioned because they do not take account of all journals and magazines – in particular those published in languages other than English – and they do not consider teaching and other activities typical of academics and which have a real impact on planning practices at the local level. In Italy the discussion is particularly heated because assessment procedures are recent, the disciplinary community is not used to publishing in ranked international journals, and the Italian literature is not attuned to the international quality criteria. The paper reviews the recent debate on planning journals and research assessment. It focuses on the Italian case from the perspective of improving current practices.

  14. Elementary Teachers' Experiences of Departmentalized Instruction and Its Impact on Student Affect

    Science.gov (United States)

    Minott, Robert Charles

    2016-01-01

    The purpose of this qualitative dissertation was to explore the lived experiences of departmentalized elementary teachers, Grades 1-3, and how they addressed their students' affective needs. The main research question of the study was how do elementary school teachers perceive departmentalized instruction and describe their experiences of this…

  15. The Effect of Departmentalization on the Reading Achievement of Sixth-Grade Students.

    Science.gov (United States)

    Harris, Mary B.

    A study examined whether departmentalization affected the reading achievement of sixth-grade students attending a Chicago public school. A random sample of 30 students was chosen from a group of 53 who received instruction in a departmentalized program. A second random sample of 30 was selected from a total of 54 students who received instruction…

  16. Elementary Teachers' Experiences and Perceptions of Departmentalized Instruction: A Case Study

    Science.gov (United States)

    Strohl, Alecia; Schmertzing, Lorraine; Schmertzing, Richard

    2014-01-01

    This case study investigated elementary teachers' experiences and perceptions during a trial year of departmentalized instruction in a rural south Georgia elementary school. To inform their decision about whole-school departmentalization for the future, school administrators appointed twelve first through third grade teachers to pilot the…

  17. The Benefits of Departmentalization in Upper Elementary Grades for Students and Teachers

    Science.gov (United States)

    Johnson, Malissa Lee

    2013-01-01

    This study addressed the benefits of departmentalization in upper elementary grades for students and teachers. The variables of gender and classroom structure (departmentalized versus self-contained) were considered for student participants (n = 125). Results for students were evaluated on pre-test and post-test data using the following measures:…

  18. 22 CFR 161.12 - Environmental effects abroad of major departmental actions.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Environmental effects abroad of major... Requirements of NEPA § 161.12 Environmental effects abroad of major departmental actions. Departmental officials shall analyze actions under their cognizance with due regard for the environmental effects in the...

  19. 41 CFR 128-1.5007 - Reproduction of departmental and bureau seals.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Reproduction of departmental and bureau seals. 128-1.5007 Section 128-1.5007 Public Contracts and Property Management Federal... and Responsibilities for Personal Property Management § 128-1.5007 Reproduction of departmental and...

  20. 76 FR 69797 - Senior Executive Service Departmental Offices Performance Review Board.

    Science.gov (United States)

    2011-11-09

    ... DEPARTMENT OF THE TREASURY Senior Executive Service Departmental Offices Performance Review Board. AGENCY: Treasury Department. ACTION: Notice of members of the Departmental Offices Performances Review Board. SUMMARY: Pursuant to 5 U.S.C. 4314(c)(4), this notice announces the appointment of members of the...

  1. Assessing the Financial Condition of Provider-Sponsored Health Plans.

    Science.gov (United States)

    McCue, Michael J

    2015-06-01

    The aim of this study was to assess the performance of health plans sponsored by provider organizations, with respect to plans generating strong positive cash flow relative to plans generating weaker cash flow. A secondary aim was to assess their capital adequacy. The study identified 24 provider-sponsored health plans (PSHPs) with an average positive cash flow margin from 2011 through 2013 at or above the top 75th percentile, defined as "strong cash flow PSHPs:" This group was compared with 72 PSHPs below the 75th percentile, defined as "weak cash flow PSHPs:" Atlantic Information Services Directory of Health Plans was used to identify the PSHPs. Financial ratios were computed from 2013 National Association of Insurance Commissioners Financial Filings. The study conducted a t test mean comparison between strong and weak cash flow PSHPs across an array of financial performance and capital adequacy measures. In 2013, the strong cash flow PSHPs averaged a cash-flow margin ratio of 6.6%. Weak cash flow PSHPs averaged a cash-flow margin of -0.4%. The net worth capital position of both groups was more than 4.5 times authorized capital. The operational analysis shows that strong cash-flow margin PSHPs are managing their medical costs to achieve this position. Although their medical loss ratio increased by almost 300 basis points from 2011 to 2013, it was still statistically significantly lower than the weaker cash flow PSHP group (P<.001). In terms of capital adequacy, both strong and weak cash-flow margin PSHP groups possessed sufficient capital to ensure the viability of these plans.

  2. Mathematical assessment of Canada's pandemic influenza preparedness plan.

    Science.gov (United States)

    Gumel, Abba B; Nuño, Miriam; Chowell, Gerardo

    2008-03-01

    The presence of the highly pathogenic avian H5N1 virus in wild bird populations in several regions of the world, together with recurrent cases of H5N1 influenza arising primarily from direct contact with poultry, have highlighted the urgent need for prepared-ness and coordinated global strategies to effectively combat a potential influenza pandemic. The purpose of the present study was to evaluate the Canadian pandemic influenza preparedness plan. A mathematical model of the transmission dynamics of influenza was used to keep track of the population according to risk of infection (low or high) and infection status (susceptible, exposed or infectious). The model was parametrized using available Canadian demographic data. The model was then used to evaluate the key components outlined in the Canadian plan. The results indicated that the number of cases, mortalities and hospitalizations estimated in the Canadian plan may have been underestimated; the use of antivirals, administered therapeutically, prophylactically or both, is the most effective single intervention followed by the use of a vaccine and basic public health measures; and the combined use of pharmaceutical interventions (antivirals and vaccine) can dramatically minimize the burden of the pending influenza pandemic in Canada. Based on increasing concerns of Oseltamivir resistance (wide-scale implementation), coupled with the expected unavailability of a suitable vaccine during the early stages of a pandemic, the present study evaluated the potential impact of non-pharmaceutical interventions (NPIs) which were not emphasized in the current Canadian plan. To this end, the findings suggest that the use of NPIs can drastically reduce the burden of a pandemic in Canada. A deterministic model was designed and used to assess Canada's pandemic preparedness plan. The study showed that the estimates of pandemic influenza burden given in the Canada pandemic preparedness plan may be an underestimate, and that Canada

  3. Safety assessment plans for authorization and inspection of radiation sources

    International Nuclear Information System (INIS)

    2002-05-01

    The objective of this TECDOC is to enhance the efficacy, quality and efficiency of the whole regulatory process. It provides advice on good practice administrative procedures for the regulatory process for preparation of applications, granting of authorizations, inspection, and enforcement. It also provides information on the development and use of standard safety assessment plans for authorization and inspection. The plans are intended to be used in conjunction with more detailed advice related to specific practices. In this sense, this TECDOC provides advice on a systematic approach to evaluations of protection and safety while other IAEA Safety Guides assist the user to distinguish between the acceptable and the unacceptable. This TECDOC covers administrative advice to facilitate the regulatory process governing authorization and inspection. It also covers the use of standard assessment and inspection plans and provides simplified plans for the more common, well established uses of radiation sources in medicine and industry, i.e. sources for irradiation facilities, industrial radiography, well logging, industrial gauging, unsealed sources in industry, X ray diagnosis, nuclear medicine, teletherapy and brachytherapy

  4. Safety assessment plans for authorization and inspection of radiation sources

    International Nuclear Information System (INIS)

    1999-09-01

    The objective of this TECDOC is to enhance the efficacy, quality and efficiency of the whole regulatory process. It provides advice on good practice administrative procedures for the regulatory process for preparation of applications, granting of authorizations, inspection, and enforcement. It also provides information on the development and use of standard safety assessment plans for authorization and inspection. The plans are intended to be used in conjunction with more detailed advice related to specific practices. In this sense, this TECDOC provides advice on a systematic approach to evaluations of protection and safety while other IAEA Safety Guides assist the user to distinguish between the acceptable and the unacceptable. This TECDOC covers administrative advice to facilitate the regulatory process governing authorization and inspection. It also covers the use of standard assessment and inspection plans and provides simplified plans for the more common, well established uses of radiation sources in medicine and industry, i.e. sources for irradiation facilities, industrial radiography, well logging, industrial gauging, unsealed sources in industry, X ray diagnosis, nuclear medicine, teletherapy and brachytherapy

  5. Implementing Strategic Environmental Assessment of spatial planning tools

    International Nuclear Information System (INIS)

    De Montis, Andrea

    2013-01-01

    After more than a decade from the publication of the European Directive 2001/42/CE (Directive) on Strategic Environmental Assessment (SEA), the design and construction of the interested spatial planning instruments has gone through a variety of changes and integrations in European and in world states. This inhomogeneous panorama can be explained with a pattern of institutional structures that have so far affected the implementation of the Directive. The aim of this paper is to investigate the level of implementation of the Directive in Italy by developing a comparative analysis of the quality of integration of SEA within the design of the spatial coordination plan of a set of Italian provinces. Italian practice is analyzed in the framework of a comparative study of worldwide SEA implementation within spatial and land use planning. The results reveal strengths and weaknesses in SEA implementation at the provincial level and, in particular, the emergence of critical areas of research concerning institutional context, public participation, monitoring, and observatory of the spatial transformations. -- Highlights: • This is a comparative analysis of SEA in strategic spatial planning in Italy. • The adhesion of Provinces to the study is remarkable. • SEA implementation and integration into spatial planning is still moderate. • Participation via consultations should be more widespread. • Monitoring and institution of observatories are still in an infancy stage

  6. Flexibility First, Then Standardize: A Strategy for Growing Inter-Departmental Systems.

    Science.gov (United States)

    á Torkilsheyggi, Arnvør

    2015-01-01

    Any attempt to use IT to standardize work practices faces the challenge of finding a balance between standardization and flexibility. In implementing electronic whiteboards with the goal of standardizing inter-departmental practices, a hospital in Denmark chose to follow the strategy of "flexibility first, then standardization." To improve the local grounding of the system, they first focused on flexibility by configuring the whiteboards to support intra-departmental practices. Subsequently, they focused on standardization by using the white-boards to negotiate standardization of inter-departmental practices. This paper investigates the chosen strategy and finds: that super users on many wards managed to configure the whiteboard to support intra-departmental practices; that initiatives to standardize inter-departmental practices improved coordination of certain processes; and that the chosen strategy posed a challenge for finding the right time and manner to shift the balance from flexibility to standardization.

  7. 42 CFR 460.132 - Quality assessment and performance improvement plan.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Quality assessment and performance improvement plan... assessment and performance improvement plan. (a) Basic rule. A PACE organization must have a written quality assessment and performance improvement plan. (b) Annual review. The PACE governing body must review the plan...

  8. USGCRP's Sustained Assessment Process: Progress to date and future plans

    Science.gov (United States)

    DeAngelo, B. J.; Reidmiller, D.; Lipschultz, F.; Cloyd, E. T.

    2016-12-01

    One of the four main objectives of the U.S. Global Change Research Program's (USGCRP's) Strategic Plan is to "Conduct Sustained Assessments", which seeks to build a process that synthesizes and advances the state of scientific knowledge on global change, develops future scenarios and potential impacts, and evaluates how effectively science is being and can be used to inform and support the Nation's response to climate change. To do so, USGCRP strives to establish a standing capacity to conduct national climate assessments with sectoral and regional information to evaluate climate risks and opportunities, and to inform decision-making, especially with regard to resiliency planning and adaptation measures. Building on the success of the 3rd National Climate Assessment (NCA) (2014), we discuss the range of USGCRP activities that embody the sustained assessment concept. Special reports, such as the recent Climate and Human Health Assessment and upcoming Climate Science Special Report, fill gaps in our understanding and provide crucial building blocks for next NCA report (NCA4). To facilitate the use of consistent assumptions across NCA4, new scenario products for climate, population, and land use will be made available through initiatives such as NOAA's Climate Resilience Toolkit. NCA4 will be informed by user engagement to advance the customization of knowledge. The report will strive to advance our ability to quantify various risks, monetize certain impacts, and communicate the benefits (i.e., avoided impacts) of various mitigation pathways. NCAnet (a national network of climate-interested stakeholders) continues to grow and foster collaborations across levels of governance and within civil society. Finally, USGCRP continues to actively engage with other assessment processes, at international, state, city, and tribal levels, to exchange ideas and to facilitate the potential for "linked" assessments across spatial scales.

  9. 1998 242-A interim evaporator tank system integrity assessment plan

    Energy Technology Data Exchange (ETDEWEB)

    Jensen, C.E.

    1998-03-31

    Portions of the 242-A Evaporator on the Hanford Site must be assessed to meet the requirements of the Washington State Department of Ecology`s Dangerous Waste Regulation, Washington Administrative Code (WAC) 173-303. The assessment is limited to the provisions of Section 173-303-640. This Integrity Assessment Plan (IAP) identifies tasks which will be performed during the assessment phase and describes the intended assessment techniques. The 242-A Evaporator facility processes waste solutions from most of the operating laboratories and plants of the Hanford Site. The waste solutions are concentrated in the evaporator to a slurry of liquid and crystallized salts. This concentrated slurry is returned to the Tank Farms at a significantly reduce volume. The water vapor from the evaporation process is condensed, filtered, and can be pumped through an ion exchange bed before transfer to a retention basin. The non-condensable portion of the vapor is filtered and continuously monitored before venting to the atmosphere. The 242-A Evaporator will be assessed as seven subsystems. Four of the subsystems store, transport or treat Washington State Dangerous wastes, the other three subsystems are integral parts of the process, however, they do not directly store, transfer, or treat listed dangerous wastes. The facility will be inspected, tested, and analyzed through this assessment. The seven subsystems, defined in detail in Appendix B, are: Evaporator Process and Slurry Subsystem; Vapor Condenser Subsystem; Vessel Vent Subsystem; Process Condensate Subsystem; Steam Condensate Subsystem; Raw Water Disposal Subsystem; and Building and Secondary Containment Subsystem.

  10. 1998 242-A interim evaporator tank system integrity assessment plan

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1998-01-01

    Portions of the 242-A Evaporator on the Hanford Site must be assessed to meet the requirements of the Washington State Department of Ecology's Dangerous Waste Regulation, Washington Administrative Code (WAC) 173-303. The assessment is limited to the provisions of Section 173-303-640. This Integrity Assessment Plan (IAP) identifies tasks which will be performed during the assessment phase and describes the intended assessment techniques. The 242-A Evaporator facility processes waste solutions from most of the operating laboratories and plants of the Hanford Site. The waste solutions are concentrated in the evaporator to a slurry of liquid and crystallized salts. This concentrated slurry is returned to the Tank Farms at a significantly reduce volume. The water vapor from the evaporation process is condensed, filtered, and can be pumped through an ion exchange bed before transfer to a retention basin. The non-condensable portion of the vapor is filtered and continuously monitored before venting to the atmosphere. The 242-A Evaporator will be assessed as seven subsystems. Four of the subsystems store, transport or treat Washington State Dangerous wastes, the other three subsystems are integral parts of the process, however, they do not directly store, transfer, or treat listed dangerous wastes. The facility will be inspected, tested, and analyzed through this assessment. The seven subsystems, defined in detail in Appendix B, are: Evaporator Process and Slurry Subsystem; Vapor Condenser Subsystem; Vessel Vent Subsystem; Process Condensate Subsystem; Steam Condensate Subsystem; Raw Water Disposal Subsystem; and Building and Secondary Containment Subsystem

  11. Impact assessment of land use planning driving forces on environment

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Longgao, E-mail: chenlonggao@163.com [Institute of Land Resources, Jiangsu Normal University (JSNU), Xuzhou 221116 (China); Yang, Xiaoyan [Institute of Land Resources, Jiangsu Normal University (JSNU), Xuzhou 221116 (China); School of Environment and Spatial Informatics, China University of Mining and Technology, Xuzhou 221116 (China); Chen, Longqian [School of Environment and Spatial Informatics, China University of Mining and Technology, Xuzhou 221116 (China); Li, Long [Department of Geography, Vrije Universiteit Brussel, Brussels 1050 (Belgium)

    2015-11-15

    Land use change may exert a negative impact on environmental quality. A state–impact–state (SIS) model describing a state transform under certain impacts has been integrated into land use planning (LUP) environmental impact assessment (LUPEA). This logical model is intuitive and easy to understand, but the exploration of impact is essential to establish the indicator system and to identify the scope of land use environmental impact when it is applied to a specific region. In this study, we investigated environmental driving forces from land use planning (LUPF), along with the conception, components, scope, and impact of LUPF. This method was illustrated by a case study in Zoucheng, China. Through the results, we concluded that (1) the LUPF on environment are impacts originated from the implementation of LUP on a regional environment, which are characterized by four aspects: magnitude, direction, action point, and its owner; (2) various scopes of LUPF on individual environmental elements based on different standards jointly define the final scope of LUPEA; (3) our case study in Zoucheng demonstrates the practicability of this proposed approach; (4) this method can be embedded into LUPEA with direction, magnitudes, and scopes of the LUPF on individual elements obtained, and the identified indicator system can be directly employed into LUPEA and (5) the assessment helps to identify key indicators and to set up a corresponding strategy to mitigate the negative impact of LUP on the environment, which are two important objectives of strategic environmental assessment (SEA) in LUP. - Highlights: • Environmental driving forces from land use planning (LUPF) are investigated and categorized. • Our method can obtains the direction, magnitudes and scopes of environmental driving forces. • The LUPEA scope is determined by the combination of various scopes of LUPF on individual elements. • LUPF assessment can be embedded into LUPEA. • The method can help to

  12. Vulnerability Assessments and Resilience Planning at Federal Sites

    Energy Technology Data Exchange (ETDEWEB)

    Moss, Richard H. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Blohm, Andrew [Univ. of Maryland, College Park, MD (United States); Delgado, Alison [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Henriques, Justin J. [James Madison Univ., Harrisonburg, VA (United States); Malone, Elizabeth L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-02-01

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Departments of Energy and Defense. The paper provides a framework of steps for climate vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change.

  13. Integration of Regional Mitigation Assessment and Conservation Planning

    Directory of Open Access Journals (Sweden)

    James H. Thorne

    2009-06-01

    Full Text Available Government agencies that develop infrastructure such as roads, waterworks, and energy delivery often impact natural ecosystems, but they also have unique opportunities to contribute to the conservation of regional natural resources through compensatory mitigation. Infrastructure development requires a planning, funding, and implementation cycle that can frequently take a decade or longer, but biological mitigation is often planned and implemented late in this process, in a project-by-project piecemeal manner. By adopting early regional mitigation needs assessment and planning for habitat-level impacts from multiple infrastructure projects, agencies could secure time needed to proactively integrate these obligations into regional conservation objectives. Such practice can be financially and ecologically beneficial due to economies of scale, and because earlier mitigation implementation means potentially developable critical parcels may still be available for conservation. Here, we compare the integration of regional conservation designs, termed greenprints, with early multi-project mitigation assessment for two areas in California, USA. The expected spatial extent of habitat impacts and associated mitigation requirements from multiple projects were identified for each area. We used the reserve-selection algorithm MARXAN to identify a regional greenprint for each site and to seek mitigation solutions through parcel acquisition that would contribute to the greenprint, as well as meet agency obligations. The two areas differed in the amount of input data available, the types of conservation objectives identified, and local land-management capacity. They are representative of the range of conditions that conservation practitioners may encounter, so contrasting the two illustrates how regional advanced mitigation can be generalized for use in a wide variety of settings. Environmental organizations can benefit from this approach because it provides a

  14. Resident career planning needs in internal medicine: a qualitative assessment.

    Science.gov (United States)

    Garcia, Rina L; Windish, Donna M; Rosenbaum, Julie R

    2010-12-01

    Few residency programs have centralized resources for career planning. As a consequence, little is known about residents' informational needs regarding career planning. To examine career preparation stressors, practical needs, and information that residents wished they were privy to when applying. In 2007 and 2008, we surveyed 163 recent graduates or graduating residents from 10 Yale-based and Yale-affiliated hospitals' internal medicine programs regarding their experiences with applying for positions after residency. We included questions about demographics, mentorship, stress of finding a job or fellowship, and open-ended questions to assess barriers and frustrations. Qualitative data were coded independently and a classification scheme was negotiated by consensus. A total of 89 residents or recent graduates responded, and 75% of them found career planning during residency training at least somewhat stressful. Themes regarding the application process included (1) knowledge about the process, (2) knowledge about career paths and opportunities, (3) time factors, (4) importance of adequate personal guidance and mentorship, and (5) self-knowledge regarding priorities and the desired outcome. Residents identified the following advice as most important: (1) start the process as early as possible and with a clear knowledge of the process timeline, (2) be clear about personal goals and priorities, and (3) be well-informed about a prospective employer and what that employer is looking for. Most residents felt career planning should be structured into the curriculum and should occur in the first year or throughout residency. This study highlights residents' desire for structured dissemination of information and counseling with regard to career planning during residency. Our data suggest that exposure to such resources may be beneficial as early as the first year of training.

  15. Remediation planning and risk assessment support through data fusion technology

    International Nuclear Information System (INIS)

    1996-01-01

    Coleman Research's Data Fusion Modeling (DFM) services gives one the ability to use large geophysical and hydrological data sets, which include direct and indirect measurements, to obtain a unified mathematical model of the geology and hydrology at one's site. Coleman Research (CRC) has adapted highly stable and efficient statistical inversion techniques, developed over the past 20 years, to provide a 3D site model with quantified uncertainty based on state-of-the-art modeling codes. This site model supports risk assessment and remediation planning with enhanced numerical accuracy for tradeoff studies of alternate remediation strategies. Further, DFM supports real time model updates during remediation and site investigation

  16. 78 FR 12676 - Timing Requirements for the Submission of a Site Assessment Plan (SAP) or General Activities Plan...

    Science.gov (United States)

    2013-02-25

    ...: BOEM-2012-0077] RIN 1010-AD77 Timing Requirements for the Submission of a Site Assessment Plan (SAP) or... would amend the timing requirements for submitting a Site Assessment Plan (SAP) or General Activities... and grants will have a preliminary term of 12 months in which a lessee or grantee must submit a SAP or...

  17. 76 FR 4719 - Draft Comprehensive Conservation Plan and Environmental Assessment, Selawik National Wildlife...

    Science.gov (United States)

    2011-01-26

    ... guides and transporters to maintain big game hunting opportunities while reducing social conflict in the...] Draft Comprehensive Conservation Plan and Environmental Assessment, Selawik National Wildlife Refuge... period for the Revised Comprehensive Conservation Plan and Environmental Assessment for Selawik National...

  18. The Groundwater Performance Assessment Project Quality Assurance Plan

    International Nuclear Information System (INIS)

    Luttrell, Stuart P.

    2006-01-01

    U.S. Department of Energy (DOE) has monitored groundwater on the Hanford Site since the 1940s to help determine what chemical and radiological contaminants have made their way into the groundwater. As regulatory requirements for monitoring increased in the 1980s, there began to be some overlap between various programs. DOE established the Groundwater Performance Assessment Project (groundwater project) in 1996 to ensure protection of the public and the environment while improving the efficiency of monitoring activities. The groundwater project is designed to support all groundwater monitoring needs at the site, eliminate redundant sampling and analysis, and establish a cost-effective hierarchy for groundwater monitoring activities. This document provides the quality assurance guidelines that will be followed by the groundwater project. This QA Plan is based on the QA requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--General Provisions/Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory's Standards-Based Management System. In addition, the groundwater project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The groundwater project has determined that the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan

  19. Assessing and Planning Health Actions During a Crisis

    Directory of Open Access Journals (Sweden)

    Selim SUNER

    2015-10-01

    Full Text Available SUMMARY: Initial stage of a disaster is managed with existing resources. The following stages of disaster response often involve assistance from outside of the disaster zone. This may consist of mutual aid from neighboring communities for small-scale incidents but in major disasters, the response is from federal or international agencies or often both. Rapid needs assessment after an incident is a collaborative effort between responding agencies and local emergency preparedness and health authorities. Ideally, a team from responding agencies with intimate knowledge and experience regarding the capabilities and assets of the responding entity along with local authorities, with decision making capacity, who have knowledge of the community, the limitations of the responding agencies and can obtain near real-time information about the incident and subject matter experts (engineering, medical, law enforcement, etc. comprise the needs assessment team. Keywords: Crisis, health action, disaster planning

  20. Assessment of environmental measures in the Dutch Tax Plan 2008

    International Nuclear Information System (INIS)

    2007-09-01

    The environmental measures that were included in the Dutch Tax plan 2008 have been evaluated for their CO2 effects. In addition, the effects on NOx and PM10 emissions have been quantified. They are the following measures: (1) Environmental differentiation of cars Clean and efficient; (2) Adjustment of addition for private use of company cars; (3) Additional financial burden environment unfriendly fuels/energy; (4) Introduction of air passenger tax (350 million euro) (5) Shift from BPM1 to MRB2; (6) Balancing energy tax for sustainably generated electricity for small consumers; (7) Introduction of packaging tax; (8) Adjustment of the tariff of waste for shredder. The effects of measures 2,7 and 8 have not been assessed by MNP (Netherlands Environmental Assessment Agency). [mk] [nl

  1. Purdue Extended Campus: Transparency, Accountability, and Assessment in Strategic Planning

    Science.gov (United States)

    Cunningham, Robin; Eddy, Michael; Pagano, Mark; Ncube, Lisa

    2011-01-01

    In 2002 President Martin Jischke initiated a new era in strategic planning at Purdue. Under his leadership, strategic planning became a centralized activity with unit plans aligned to the university plan. Strategic goals were designed to have maximum impact, which would be measurable through metrics. Strategic planning at Purdue would be an…

  2. Stalking: A Multidimensional Framework for Assessment and Safety Planning.

    Science.gov (United States)

    Logan, T K; Walker, Robert

    2015-09-03

    Despite the high prevalence of stalking and the risk of harm it poses to victims, arrest rates, prosecutions, and convictions for stalking continue to be low in the United States. The overall goal of this article is to introduce a multidimensional framework of stalking that adds to the current literature by (1) providing a conceptual framework consistent with legal elements of many stalking statutes to facilitate assessment, communication, documentation, and safety planning for stalking several victims; (2) introducing a more systematic way of assessing course of conduct and the context of fear in stalking situations in order to increase the understanding of cumulative fear for stalking victims; (3) emphasizing the aspects of stalking harm that go beyond violence and that show how harm from stalking accumulates over time including life sabotage; and (4) discussing 12 risk factors derived from the overall multidimensional framework that can be used to describe the big picture of stalking and to facilitate safety planning for victims. Implications for future research are discussed. © The Author(s) 2015.

  3. RELAP-7 Code Assessment Plan and Requirement Traceability Matrix

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, Junsoo; Choi, Yong-joon; Smith, Curtis L.

    2016-10-01

    The RELAP-7, a safety analysis code for nuclear reactor system, is under development at Idaho National Laboratory (INL). Overall, the code development is directed towards leveraging the advancements in computer science technology, numerical solution methods and physical models over the last decades. Recently, INL has also been putting an effort to establish the code assessment plan, which aims to ensure an improved final product quality through the RELAP-7 development process. The ultimate goal of this plan is to propose a suitable way to systematically assess the wide range of software requirements for RELAP-7, including the software design, user interface, and technical requirements, etc. To this end, we first survey the literature (i.e., international/domestic reports, research articles) addressing the desirable features generally required for advanced nuclear system safety analysis codes. In addition, the V&V (verification and validation) efforts as well as the legacy issues of several recently-developed codes (e.g., RELAP5-3D, TRACE V5.0) are investigated. Lastly, this paper outlines the Requirement Traceability Matrix (RTM) for RELAP-7 which can be used to systematically evaluate and identify the code development process and its present capability.

  4. IRIS Assessment Plan for Ammonia and Ammonium Salts Noncancer Oral (Scoping and Problem Formulation Materials)

    Science.gov (United States)

    In April 2018, EPA released the draft IRIS Assessment Plan for Ammonia and Ammonium Salts Noncancer Oral. An IRIS Assessment Plan (IAP) communicates to the public the plan for assessing each individual chemical and includes summary information on the IRIS Program’s sco...

  5. Assessment Planning within the Context of University English Language Teaching (ELT) in China: Implications for Teacher Assessment Literacy

    Science.gov (United States)

    Xu, Yueting

    2016-01-01

    Teacher assessment literacy (AL) is a concern for both educational assessment and teacher education research. As part of teacher AL, teacher competency of assessment planning has remained underexplored. To address this gap, this study explored how a group of 20 contest-winning university English teachers in China planned for assessment through…

  6. The Association of Departmental Quality Infrastructure and Positive Change

    Directory of Open Access Journals (Sweden)

    Jody E. Hooper MD

    2018-01-01

    Full Text Available A vertically and horizontally well-integrated quality improvement team is essential for effective quality data collection and implementation of improvement measures. We outline the quality structure of a large academic pathology department and describe successful projects across multiple divisions made possible by this tightly integrated structure. The physician vice chair for quality organizes departmental quality efforts and provides representation at the hospital level. The department has an independent continuous quality improvement unit and each laboratory of the department has a staff quality improvement representative. Faculty and staff experts have interacted to produce improvements such as accurate container labeling, efficient triage of specimens, and reduction of unnecessary testing. Specialized task forces such as the Courier Task Force are producing concrete recommendations for process improvement. All phases of pathology patient care are represented by faculty and staff who are trained in quality improvement, and each position touches and communicates actively with levels above and below itself. The key to the department’s approach has been the daily attention to quality efforts in all of its activities and the close association of faculty and staff to accomplish the goals of greater efficiency, safety, and cost savings.

  7. Integration of strategic environmental assessment in spatial planning

    DEFF Research Database (Denmark)

    Kørnøv, Lone

    The paper explores the similarities between the content of the EU directive, SEA practice and the existing spatial planning in Denmark, and how SEA can be integrated into plan making and plan implementation.......The paper explores the similarities between the content of the EU directive, SEA practice and the existing spatial planning in Denmark, and how SEA can be integrated into plan making and plan implementation....

  8. The Form is the Bottom Line, Yes, But Sometimesthe Bottom Line Alters the Form: A Reflection on the Departmental Process at UAM

    Directory of Open Access Journals (Sweden)

    Manuel Gil Antón

    2005-05-01

    Full Text Available In this work the departmental organization at higher education institutions is commented, not as a –better or worse– plan with upper intrinsic values, but as an organizational structure that, depending on its purpose, can offer an opportunity or excuses for organizational change. The experience of the Metropolitan Autonomous University is described (UAM, Mexico, as an institution that since its origin was born with a departmental structure and with a dot-matrix service of its departments. This work offers data of the first 13 years of life (1974-1987 of the Department of Sociology in UAM, at Azcapotzalco, as a sample of this kind of system. In the example, general characteristics of age, working conditions al income, academic degree al income, institution where were formed and their labor antecedents are shown. Also, the difficulties faced initially by the educators of this institution, due to their youth, are described; as well as the nostalgia of some departments about adopting traditional systems, used in practice. This is a work that offers suggestions for educational institutions who are interested in adopting the departmental model.

  9. Transformational Assessment: A Simplified Model of Strategic Planning

    Science.gov (United States)

    Bardwell, Rebecca

    2008-01-01

    Strategic planning is a way to evaluate a present situation and set a course for the future. While there is no dearth of literature on Strategic Planning, there appears to be reluctance on the part of K-12 educators to engage in strategic planning. Besides the cynicism about change, another roadblock to strategic planning is the time it takes.…

  10. Stochastic Assessments of Urban Employees’ Pension Plan of China

    Directory of Open Access Journals (Sweden)

    Yueqiang Zhao

    2018-03-01

    Full Text Available In the uncertain environment of population and economy; the pension plan for urban employees in China is under threat from various types of financial risk. This paper mainly builds a comprehensive risk assessment system to evaluate the solvency sustainability of the urban employees’ pension plan of China. Specifically, we forecast annual accumulative net asset; actuarial balance; and potential support ratio for the next seventy years. To account for the impact of demographic uncertainty on long-term finances, stochastic simulations are used to estimate the probability distribution of relative risk indicators. Moreover, we integrate the Lee–Carter model into the population projection. According to the median projection, the public pension fund will have a gap in about 35 years; and the cash flow will be negative about 25 years later. Furthermore, under the existing policy, the burden of insured employees will increase rapidly. Delayed retirement could relieve the coming solvency risk, but it does not fundamentally resolve the solvency problem in the long run.

  11. Assessing family planning service-delivery skills in Kenya.

    Science.gov (United States)

    Valadez, J J; Transgrud, R; Mbugua, M; Smith, T

    1997-06-01

    This report demonstrates the use of Lot Quality Assurance Sampling (LQAS) to evaluate the technical competence of two cohorts of family planning service providers in Kenya trained with a new curriculum. One cohort had just finished training within two months of the study. The other cohort was the first group trained with the new curriculum about one year before the study. LQAS was adapted from industrial and other public health applications to assess both the individual competence of 30 service providers and the competence of each cohort. Results show that Cohorts One and Two did not differ markedly in the number of tasks needing improvement. However, both cohorts exhibited more tasks needing improvement in counseling skills as compared with physical examination skills or with all other skills. Care-givers who were not currently providing services accounted for most service-delivery problems. This result suggests that providers' use of their skills explains their ability to retain service-delivery skills learned in training to a greater degree than does the amount of time elapsed since they were trained. LQAS proved to be a rapid, easy-to-use empirical method for management decisionmaking for improvement of a family planning training curriculum and services.

  12. Albeni Falls Wildlife Management Plan - preliminary environmental assessment

    International Nuclear Information System (INIS)

    1996-04-01

    Bonneville Power Administration (BPA) proposes to fund the development and implementation of the Albeni Falls Wildlife Management Plan. Approved by the Northwest Power Planning Council (Council) in 1990, the project is a cooperative effort with the Interagency Work Group that includes the Idaho Department of Fish and Game (IDFG); United States Fish and Wildlife Service (USFWS); United States Forest Service (USFS); United States Army Corps of Engineers (COE); the Kalispel Tribe; and the Upper Columbia United Tribes (UCUT). The proposed action would enable the Interagency Work Group to protect and enhance a variety of wetland and riparian habitats, restore 28,587 habitat units lost as a result of the construction and operation of Albeni Falls Dam, and implement long-term wildlife management activities at selected sites within the overall study area. This Environmental Assessment (EA) examines the potential environmental effects of protecting and enhancing wildlife habitat in selected portions of a 225,077 hectare (556,160 acre) study area surrounding Lake Pend Oreille in Bonner County, and 7,770 hectare (19,200 acre) area surrounding Spirit and Twin lakes, in Kootenai County, Idaho. Four proposed activities are analyzed: habitat protection; habitat enhancement; operation and maintenance (O ampersand M); and monitoring and evaluation (M ampersand E)

  13. Advanced Seismic Probabilistic Risk Assessment Demonstration Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Coleman, Justin [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    Idaho National Laboratories (INL) has an ongoing research and development (R&D) project to remove excess conservatism from seismic probabilistic risk assessments (SPRA) calculations. These risk calculations should focus on providing best estimate results, and associated insights, for evaluation and decision-making. This report presents a plan for improving our current traditional SPRA process using a seismic event recorded at a nuclear power plant site, with known outcomes, to improve the decision making process. SPRAs are intended to provide best estimates of the various combinations of structural and equipment failures that can lead to a seismic induced core damage event. However, in general this approach has been conservative, and potentially masks other important events (for instance, it was not the seismic motions that caused the Fukushima core melt events, but the tsunami ingress into the facility).

  14. WIPP [Waste Isolation Pilot Plant] test phase plan: Performance assessment

    International Nuclear Information System (INIS)

    1990-04-01

    The U.S. Department of Energy (DOE) is responsible for managing the disposition of transuranic (TRU) wastes resulting from nuclear weapons production activities of the United States. These wastes are currently stored nationwide at several of the DOE's waste generating/storage sites. The goal is to eliminate interim waste storage and achieve environmentally and institutionally acceptable permanent disposal of these TRU wastes. The Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico is being considered as a disposal facility for these TRU wastes. This document describes the first of the following two major programs planned for the Test Phase of WIPP: Performance Assessment -- determination of the long-term performance of the WIPP disposal system in accordance with the requirements of the EPA Standard; and Operations Demonstration -- evaluation of the safety and effectiveness of the DOE TRU waste management system's ability to emplace design throughput quantities of TRU waste in the WIPP underground facility. 120 refs., 19 figs., 8 tabs

  15. Assessment of PlanIQ Feasibility DVH for head and neck treatment planning.

    Science.gov (United States)

    Fried, David V; Chera, Bhishamjit S; Das, Shiva K

    2017-09-01

    Designing a radiation plan that optimally delivers both target coverage and normal tissue sparing is challenging. There are limited tools to determine what is dosimetrically achievable and frequently the experience of the planner/physician is relied upon to make these determinations. PlanIQ software provides a tool that uses target and organ at risk (OAR) geometry to indicate the difficulty of achieving different points for organ dose-volume histograms (DVH). We hypothesized that PlanIQ Feasibility DVH may aid planners in reducing dose to OARs. Clinically delivered head and neck treatments (clinical plan) were re-planned (re-plan) putting high emphasis on maximally sparing the contralateral parotid gland, contralateral submandibular gland, and larynx while maintaining routine clinical dosimetric objectives. The planner was blinded to the results of the clinically delivered plan as well as the Feasibility DVHs from PlanIQ. The re-plan treatments were designed using 3-arc VMAT in Raystation (RaySearch Laboratories, Sweden). The planner was then given the results from the PlanIQ Feasibility DVH analysis and developed an additional plan incorporating this information using 4-arc VMAT (IQ plan). The DVHs across the three treatment plans were compared with what was deemed "impossible" by PlanIQ's Feasibility DVH (Impossible DVH). The impossible DVH (red) is defined as the DVH generated using the minimal dose that any voxel outside the targets must receive given 100% target coverage. The re-plans performed blinded to PlanIQ Feasibilty DVH achieved superior sparing of aforementioned OARs compared to the clinically delivered plans and resulted in discrepancies from the impossible DVHs by an average of 200-700 cGy. Using the PlanIQ Feasibility DVH led to additionalOAR sparing compared to both the re-plans and clinical plans and reduced the discrepancies from the impossible DVHs to an average of approximately 100 cGy. The dose reduction from clinical to re-plan and re-plan to

  16. Comparing comprehensive care and departmental clinical education models: students' perceptions at the University of Tennessee College of Dentistry.

    Science.gov (United States)

    Dehghan, Mojdeh; Harrison, Janet; Langham, Sue; Scarbecz, Mark; Amini, Mehdi

    2015-02-01

    In summer 2012, the University of Tennessee Health Science Center College of Dentistry transitioned from a departmental clinical education model to a comprehensive care/group leader model. The aim of this study was to investigate the perspectives of the fourth-year class of dental students who, because the transition took place during their training, had experienced treating patients under both educational models. To achieve this objective, a questionnaire was designed to assess the students' opinions on the efficiency of their effort, availability of specialty faculty, stress, collaboration with classmates, and availability of exposure to different practice styles and techniques under the two systems. The students were also given an opportunity to provide open-ended feedback on the shortcomings and advantages of the systems. The Class of 2013 had 81 students, 55 of whom participated in the survey for a response rate of 67.9%. The majority (86%) of the respondents preferred the comprehensive care model and reported feeling that, in it, they were able to accomplish more comprehensive dentistry with greater consistency of supervision from faculty in a more patient-centered environment than in the departmental model. However, 56 percent considered having the same group leader for two years a disadvantage and recommended rotation of at least one group leader every six months. The results of this survey can help this college and other dental schools that are seeking to optimize their educational model to best serve students' educational experience and the dental needs of their patient population.

  17. Fraser Valley System Reinforcement Project: Environmental planning and assessment report

    International Nuclear Information System (INIS)

    1991-06-01

    Transmission facilities in the south central Fraser Valley, British Columbia, need reinforcement in order to meet anticipated growth in power demand. This objective could be met by reinforcing substation facilities (adding 500-kV equipment and connection to transmission line 5L41) at the McLellan Substation in Surrey, at the Clayburn Substation in Matsqui, or at the Atchelitz Substation in Chilliwack. An assessment is provided of the environmental evaluation criteria applied to these potential sites for substation reinforcement and the rationale for selection of the Clayburn site as the environmentally most effective alternative. The Clayburn site is already cleared and managed for a 230-kV substation; environmental, land use, and socioeconomic impacts are considered manageable. The existing right-of-way for the 500-kV loop in to the substation can be utilized. In addition, the results of an environmental assessment and mitigation plan for the Clayburn substation reinforcement are described. The most significant factors that will require possible mitigative measures include fisheries, water quality, floodplain management, visual and recreational aspects, and heritage resources. 16 figs., 5 tabs

  18. Maintenance Plan for the Hanford Immobilized Low-Activity Tank Waste Performance Assessment

    International Nuclear Information System (INIS)

    MANN, F.M.

    2000-01-01

    The plan for maintaining the Hanford Immobilized Low-Activity Tank Waste Performance Assessment (PA) is described. The plan includes expected work on PA reviews and revisions, waste reports, monitoring, other operational activities, etc

  19. Balancing High Quality Subject-Matter Instruction with Positive Teacher-Student Relations in the Middle Grades: Effects of Departmentalization, Tracking and Block Scheduling on Learning Environments. Report No. 15.

    Science.gov (United States)

    McPartland, James M.

    This study tests the general hypothesis that there is no single best way to organize a middle school to meet the variety of needs of early adolescent students. Using data from a sample of 433 schools in the Pennsylvania Educational Quality Assessment, it examines the effects of self-contained classroom instruction and departmentalization on two…

  20. Using the departmental Radiology information system to replace specialist registrars logbooks

    International Nuclear Information System (INIS)

    Rauf, Omair; Whitehouse, Richard W.

    2000-01-01

    AIM: To produce and assess a robust and user friendly specialist registrar logbook using a Radiology departmental management system. MATERIALS AND METHODS: Our Radiology management system was modified to include logbook specific data fields. This allowed up to three registrars to be directly involved in any procedure, and two more to be observers to the reporting with only one screen entry, made on the terminals available throughout the department. Logbooks were produced by a PC based analysis program which also compared registrars' experience with updated averages. A comparison of computer generated logbooks with paper logbooks and a user satisfaction survey was undertaken after 1 year of running the system. RESULTS: Computer generated logbooks showed consistent numbers of complex procedures in comparison with other logbook types, with more comprehensive details of each procedure. A survey of the registrars showed an overwhelming preference for the computer generated logbook. CONCLUSION: Modification of a Radiology management system is a robust method of logbook provision, preferred by the registrars over paper or other electronic logbooks and providing the RCR tutor with consistent data on registrar training experience. Rauf, O., Whitehouse, R.W. (2000)

  1. 15 CFR 23.3 - Plan.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Plan. 23.3 Section 23.3 Commerce and... MISSING CHILDREN § 23.3 Plan. (a) The Department of Commerce will supplement and expand the national... biannual meetings of departmental representatives to discuss the current plan and recommendations for...

  2. Risk assessment to an integrated planning model for UST programs

    International Nuclear Information System (INIS)

    Ferguson, K.W.

    1993-01-01

    The US Postal Service maintains the largest civilian fleet in the United States totaling approximately 180,000 vehicles. To support the fleets daily energy requirements, the Postal Service also operates one of the largest networks of underground storage tanks nearly 7,500 nationwide. A program to apply risk assessment to planning, budget development and other management actions was implemented during September, 1989. Working closely with a consultant, the postal service developed regulatory and environmental risk criteria and weighting factors for a ranking model. The primary objective was to identify relative risks for each underground tank at individual facilities. Relative risks at each facility were determined central to prioritizing scheduled improvements to the tank network. The survey was conducted on 302 underground tanks in the Northeast Region of the US. An environmental and regulatory risk score was computed for each UST. By ranking the tanks according to their risk score, tanks were classified into management action categories including, but the limited to, underground tank testing, retrofit, repair, replacement and closure

  3. Common and Critical Components Among Community Health Assessment and Community Health Improvement Planning Models.

    Science.gov (United States)

    Pennel, Cara L; Burdine, James N; Prochaska, John D; McLeroy, Kenneth R

    Community health assessment and community health improvement planning are continuous, systematic processes for assessing and addressing health needs in a community. Since there are different models to guide assessment and planning, as well as a variety of organizations and agencies that carry out these activities, there may be confusion in choosing among approaches. By examining the various components of the different assessment and planning models, we are able to identify areas for coordination, ways to maximize collaboration, and strategies to further improve community health. We identified 11 common assessment and planning components across 18 models and requirements, with a particular focus on health department, health system, and hospital models and requirements. These common components included preplanning; developing partnerships; developing vision and scope; collecting, analyzing, and interpreting data; identifying community assets; identifying priorities; developing and implementing an intervention plan; developing and implementing an evaluation plan; communicating and receiving feedback on the assessment findings and/or the plan; planning for sustainability; and celebrating success. Within several of these components, we discuss characteristics that are critical to improving community health. Practice implications include better understanding of different models and requirements by health departments, hospitals, and others involved in assessment and planning to improve cross-sector collaboration, collective impact, and community health. In addition, federal and state policy and accreditation requirements may be revised or implemented to better facilitate assessment and planning collaboration between health departments, hospitals, and others for the purpose of improving community health.

  4. Planning Environmental Impact Assessment Orienting Sustainable Development:Opportunities and Challenges

    Institute of Scientific and Technical Information of China (English)

    Sun Yanjun; Chen Xingeng; Bao Yun; Peng Xiaochun; Gao Changbo

    2005-01-01

    Strategic Environmental Assessment is a frontier subject in the field of Environmental Impact Assessment. In the past two decades, especially in recent years, much more importance has been attached to Strategic Environmental Assessment. The Environmental Impact Assessment Law of the P.R.China which was promulgated provides a great opportunity for the development of Planning Environmental Impact Assessment and brings great challenges for the development of traditional Project Environmental Impact Assessment and Planning Environmental Impact Assessment at the same time.In order to promote the implementation of"The EIA Law", the inherent limitations of Project Environmental Impact Assessment must be identified sufficiendy and the theory research and practice of Planning Environmental Impact Assessment should be strengthened as well. Measures should be taken currendy to enforce the operation system. The authors wish to offer a few references to the progress and implementation of Planning Environmental Impact Assessment in China.

  5. Study on environmental impact assessment index system of uranium production base construction plan

    International Nuclear Information System (INIS)

    Liu Xiaochao; Song Liquan

    2008-01-01

    The index system on planning environmental impact assessment of uranium mining base construction is discussed by using the hiberarchy method according to characteristics of uranium production and environmental protection object of planning assessment. The suggested index system is in favor of persistent exploitation of uranium resource and environmental protection in the uranium mining area, and can provide a reference for planning environmental impact assessment of uranium mining base construction in China. (authors)

  6. Expanding Canada Pension Plan Retirement Benefits: Assessing Big CPP Proposals

    Directory of Open Access Journals (Sweden)

    Jonathan R. Kesselman

    2010-10-01

    Full Text Available Current and growing deficiencies in many workers’ ability to maintain their accustomed living standards in retirement have evoked varied proposals for reform of Canada’s retirement income system. This study focuses on proposals for expanding the retirement benefits of the Canada Pension Plan (CPP, and undertakes comparative analysis with proposals for reforms affecting workplace pensions and individual savings. It begins by reviewing key policy questions for the retirement income system and describing essential features of several proposals for CPP benefit expansion. It then uses these “Big CPP” proposals as a basis to assess the design issues for expanding CPP benefits and the implications for other components of the retirement income system. The paper assesses each of the major private and public savings vehicles based on multifaceted criteria for a well-performing retirement income system; a mandatory public scheme with defined benefits ranks most highly on almost all criteria other than individual flexibility. Additional behavioural and institutional factors also support the use of mandatory public pensions: myopia in savings, individual investment behaviour, scale economies and costs of fund management, adverse selection and annuitization costs, the Samaritan’s Dilemma, and labour market incentives. The study provides an overview analysis of key design issues for the expansion of CPP retirement benefits. Major issues include the desirable scale of expansion for both the percentage of insurable earnings and the insurable earnings ceiling; mandatory versus voluntary coverage and options; the allocation of investment return risk; and the phasing-in of higher premiums and benefits. The study then assesses the implications of CPP expansion for other components of the retirement income system: Old Age Security and the Guaranteed Income Supplement, workplace pensions, tax provisions for savings, and individual savings. A Big CPP fits

  7. Planning report for the safety assessment SR-Can

    International Nuclear Information System (INIS)

    2003-06-01

    This document is a planning report for SKB's next assessment of long-term safety for a KBS 3 repository. The assessment, SR-Can, is to be finished by the end of 2005 and will be used for SKB's application to build an Encapsulation plant for spent nuclear fuel. Apart from outlining the methodology, the report discusses the handling in SR-Can of a number of important issues regarding the near field, the geosphere, the biosphere, the climatic evolution etc. The Swedish nuclear safety and radiation protection authorities have recently issued regulations concerning the final disposal of nuclear waste. The principal compliance criterion states that the annual risk of harmful effects must not exceed 10 -6 for a representative individual in the group exposed to the greatest risk. There are also a number of requirements on methodological aspects of the safety assessment as well as on the contents of a safety report. The regulations are reproduced in an Appendix to this report. The primary safety function of the KBS 3 system is to completely isolate the spent nuclear fuel within copper canisters over the entire assessment period, which will be one million years in SR-Can. Should a canister be damaged, the secondary safety function is to retard any releases from the canisters. The main steps of the assessment are the following: 1. Qualitative system description, FEP processing: This step consists of defining a system boundary and of describing the system on a format suitable for the safety assessment. Databases of relevant features, events and processes influencing long-term safety are structured and used as one starting point for the assessment. 2. Initial state descriptions. 3. Process descriptions: In this step all identified processes within the system boundary involved in the long-term evolution of the system are described in detail. 4. Description of boundary conditions: This step is a broad description of the evolution of the boundaries of the system, focussing mainly

  8. NRPB corporate plan

    International Nuclear Information System (INIS)

    Clarke, Roger

    1995-01-01

    As with all non-departmental public bodies, the National Radiological Protection Board is required to prepare a Corporate Plan each year. The Plan for 1995/1996 to 1999/2000 is now available as a Board report; extracts from the introductory section are given here. They deal with the Board's statutory duty to provide advice and conduct research and with its power to provide services, all in relation to ionising and non-ionising radiations. (author)

  9. Departmentalization and Organizational Context: The Experience of the University of Guadalajara

    Directory of Open Access Journals (Sweden)

    Adrián Acosta Silva

    2005-05-01

    Full Text Available This work consists of an evaluation of the experience of organizational reform and academic departmentalization at a Mexican public university, the University of Guadalajara (U. of G., occurred in the period of 1994-2005. It is a research carried out from the perspective of the institutional change analysis, which obeys the interest of carrying out a rigorous evaluation of the process, after 11 years of its institutional operation. From a reconstruction of the context that gave origin and sense to the reform proposal and to the idea of academic departmentalization, some of the results and conditions in which the academic departments of the U. of G operate are analyzed. Finally, some of the problems and challenges that face the departmental structure in this institutional experience are identified.

  10. Integrating strategic environmental assessment with industry planning: a case study of the Pasquai-Porcupine forest management plan, Saskatchewan, Canada.

    Science.gov (United States)

    Noble, Bram F

    2004-03-01

    Strategic environmental assessment (SEA) is gaining widespread recognition as a tool for integrating environmental considerations in policy, plan, and program development and decision-making. Notwithstanding the potential of SEA to improve higher-order decision processes, there has been very little attention given to integrating SEA with industry planning practices. As a result, the benefits of SEA have yet to be fully realized among industrial proponents. That said, SEA practice is ongoing, albeit informally and often under a different label, and is proving to be a valuable tool for industry planning and decision-making. Based on a case study of the Pasquai-Porcupine forest management plan in Saskatchewan, Canada, this paper illustrates how an integrated approach to SEA can contribute to industry environmental decision-making and can enhance the quality and deliverability of industry plans.

  11. Assessments for high dose radionuclide therapy treatment planning

    International Nuclear Information System (INIS)

    Fisher, D.R.

    2003-01-01

    Advances in the biotechnology of cell specific targeting of cancer and the increased number of clinical trials involving treatment of cancer patients with radiolabelled antibodies, peptides, and similar delivery vehicles have led to an increase in the number of high dose radionuclide therapy procedures. Optimised radionuclide therapy for cancer treatment is based on the concept of absorbed dose to the dose limiting normal organ or tissue. The limiting normal tissue is often the red marrow, but it may sometimes be the lungs, liver, intestinal tract, or kidneys. Appropriate treatment planning requires assessment of radiation dose to several internal organs and tissues, and usually involves biodistribution studies in the patient using a tracer amount of radionuclide bound to the targeting agent and imaged at sequential timepoints using a planar gamma camera. Time-activity curves are developed from the imaging data for the major organ tissues of concern, for the whole body and sometimes for selected tumours. Patient specific factors often require that dose estimates be customised for each patient. In the United States, the Food and Drug Administration regulates the experimental use of investigational new drugs and requires 'reasonable calculation of radiation absorbed dose to the whole body and to critical organs' using the methods prescribed by the Medical Internal Radiation Dose (MIRD) Committee of the Society of Nuclear Medicine. Review of high dose studies shows that some are conducted with minimal dosimetry, that the marrow dose is difficult to establish and is subject to large uncertainties. Despite the general availability of software, internal dosimetry methods often seem to be inconsistent from one clinical centre to another. (author)

  12. Comments on the MIT Assessment of the Mars One Plan

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    The MIT assessment of the Mars One mission plan reveals design assumptions that would cause significant difficulties. Growing crops in the crew chamber produces excessive oxygen levels. The assumed in-situ resource utilization (ISRU) equipment has too low a Technology Readiness Level (TRL). The required spare parts cause a large and increasing launch mass logistics burden. The assumed International Space Station (ISS) Environmental Control and Life Support (ECLS) technologies were developed for microgravity and therefore are not suitable for Mars gravity. Growing food requires more mass than sending food from Earth. The large number of spares is due to the relatively low reliability of ECLS and the low TRL of ISRU. The Mars One habitat design is similar to past concepts but does not incorporate current knowledge. The MIT architecture analysis tool for long-term settlements on the Martian surface includes an ECLS system simulation, an ISRU sizing model, and an analysis of required spares. The MIT tool showed the need for separate crop and crew chambers, the large spare parts logistics, that crops require more mass than Earth food, and that more spares are needed if reliability is lower. That ISRU has low TRL and ISS ECLS was designed for microgravity are well known. Interestingly, the results produced by the architecture analysis tool - separate crop chamber, large spares mass, large crop chamber mass, and low reliability requiring more spares - were also well known. A common approach to ECLS architecture analysis is to build a complex model that is intended to be all-inclusive and is hoped will help solve all design problems. Such models can struggle to replicate obvious and well-known results and are often unable to answer unanticipated new questions. A better approach would be to survey the literature for background knowledge and then directly analyze the important problems.

  13. 77 FR 24979 - Plan of Operations, Environmental Assessment, Big Thicket National Preserve, Texas

    Science.gov (United States)

    2012-04-26

    ... DEPARTMENT OF THE INTERIOR National Park Service [7148-NZY] Plan of Operations, Environmental.... ACTION: Notice of Availability of a Plan of Operations and Environmental Assessment for a 30-day public... Energy Company (Cimarex), a Plan of Operations to conduct the Rivers Edge 3-D Seismic Survey within the...

  14. Transmission capacity assessment by probabilistic planning. An approach

    International Nuclear Information System (INIS)

    Lammintausta, M.

    2002-01-01

    The Finnish electricity markets participate in the Scandinavian markets, Nord-Pool. The Finnish market is free for marketers, producers and consumers. All these participants can be seen as customers of the transmission network, which in turn can be considered to be a market place in which electricity can be sold and bought. The Finnish transmission network is owned and operated by an independent company, Fingrid that has the full responsibility of the Finnish transmission system. The available transfer capacity of a transmission route is traditionally limited by deterministic security constraints. More efficient and flexible network utilisation could be achieved with probabilistic planning methods. This report introduces a simple and practical probabilistic approach for transfer limit and risk assessment. The method is based on the economical benefit and risk predictions. It uses also the existing results of deterministic data and it could be used side by side with the deterministic method. The basic concept and necessary equations for expected risks of various market players have been derived for further developments. The outage costs and thereby the risks of the market participants depend on how the system operator reacts to the faults. In the Finnish power system consumers will usually experience no costs due to the faults because of meshed network and counter trade method preferred by the system operator. The costs to the producers and dealers are also low because of the counter trade method. The network company will lose the cost of reparation, additional losses and cost of regulation power because of counter trades. In case power flows will be rearranged drastically because of aggressive strategies used in the electricity markets, the only way to fulfil the needs of free markets is that the network operator buys regulation power for short-term problems and reinforces the network in the long-term situations. The reinforcement is done if the network can not be

  15. Landscape ecological assessment: a tool for integrating biodiversity issues in strategic environmental assessment and planning.

    Science.gov (United States)

    Mörtberg, U M; Balfors, B; Knol, W C

    2007-03-01

    To achieve a sustainable development, impacts on biodiversity of urbanisation, new infrastructure projects and other land use changes must be considered on landscape and regional scales. This requires that important decisions are made after a systematic evaluation of environmental impacts. Landscape ecology can provide a conceptual framework for the assessment of consequences of long-term development processes like urbanisation on biodiversity components, and for evaluating and visualising the impacts of alternative planning scenarios. The aim of this paper was to develop methods for integrating biodiversity issues in planning and strategic environmental assessment in an urbanising environment, on landscape and regional levels. In order to test developed methods, a case study was conducted in the region of Stockholm, the capital of Sweden, and the study area embraced the city centre, suburbs and peri-urban areas. Focal species were tested as indicators of habitat quality, quantity and connectivity in the landscape. Predictive modelling of habitat distribution in geographic information systems involved the modelling of focal species occurrences based on empirical data, incorporated in a landscape ecological decision support system. When habitat models were retrieved, they were applied on future planning scenarios in order to predict and assess the impacts on focal species. The scenario involving a diffuse exploitation pattern had the greatest negative impacts on the habitat networks of focal species. The scenarios with concentrated exploitation also had negative impacts, although they were possible to mitigate quite easily. The predictions of the impacts on habitats networks of focal species made it possible to quantify, integrate and visualise the effects of urbanisation scenarios on aspects of biodiversity on a landscape level.

  16. Managerial span of control: a pilot study comparing departmental complexity and number of direct reports.

    Science.gov (United States)

    Merrill, Katreena Collette; Pepper, Ginette; Blegen, Mary

    2013-09-01

    Nurse managers play pivotal roles in hospitals. However, restructuring has resulted in nurse managers having wider span of control and reduced visibility. The purpose of this pilot study was to compare two methods of measuring span of control: departmental complexity and number of direct reports. Forty-one nurse managers across nine hospitals completed The Ottawa Hospital Clinical Manager Span of Control Tool (TOH-SOC) and a demographic survey. A moderate positive relationship between number of direct reports and departmental complexity score was identified (r=.49, p=managers' responsibility. Copyright © 2013 Longwoods Publishing.

  17. 78 FR 10606 - Final Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Science.gov (United States)

    2013-02-14

    ... Environmental Assessment for Monitor National Marine Sanctuary: Notice of Public Availability AGENCY: Office of National Marine Sanctuaries (ONMS), National Ocean Service (NOS), National Oceanic and Atmospheric... releasing the final management plan and environmental assessment for Monitor National Marine Sanctuary. DATE...

  18. Planning report for the safety assessment SR-Can

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-06-01

    This document is a planning report for SKB's next assessment of long-term safety for a KBS 3 repository. The assessment, SR-Can, is to be finished by the end of 2005 and will be used for SKB's application to build an Encapsulation plant for spent nuclear fuel. Apart from outlining the methodology, the report discusses the handling in SR-Can of a number of important issues regarding the near field, the geosphere, the biosphere, the climatic evolution etc. The Swedish nuclear safety and radiation protection authorities have recently issued regulations concerning the final disposal of nuclear waste. The principal compliance criterion states that the annual risk of harmful effects must not exceed 10{sup -6} for a representative individual in the group exposed to the greatest risk. There are also a number of requirements on methodological aspects of the safety assessment as well as on the contents of a safety report. The regulations are reproduced in an Appendix to this report. The primary safety function of the KBS 3 system is to completely isolate the spent nuclear fuel within copper canisters over the entire assessment period, which will be one million years in SR-Can. Should a canister be damaged, the secondary safety function is to retard any releases from the canisters. The main steps of the assessment are the following: 1. Qualitative system description, FEP processing: This step consists of defining a system boundary and of describing the system on a format suitable for the safety assessment. Databases of relevant features, events and processes influencing long-term safety are structured and used as one starting point for the assessment. 2. Initial state descriptions. 3. Process descriptions: In this step all identified processes within the system boundary involved in the long-term evolution of the system are described in detail. 4. Description of boundary conditions: This step is a broad description of the evolution of the boundaries of the system

  19. Health impact assessment in planning: Development of the design for health HIA tools

    International Nuclear Information System (INIS)

    Forsyth, Ann; Slotterback, Carissa Schively; Krizek, Kevin J.

    2010-01-01

    How can planners more systematically incorporate health concerns into practical planning processes? This paper describes a suite of health impact assessment tools (HIAs) developed specifically for planning practice. Taking an evidence-based approach the tools are designed to fit into existing planning activities. The tools include: a short audit tool, the Preliminary Checklist; a structured participatory workshop, the Rapid HIA; an intermediate health impact assessment, the Threshold Analysis; and a set of Plan Review Checklists. This description provides a basis for future work including assessing tool validity, refining specific tools, and creating alternatives.

  20. The Survivor Benefit Plan (SBP): Assessing Retirees' Cost Share

    National Research Council Canada - National Science Library

    DiPuccio, Andrew

    1999-01-01

    The Survivor Benefit Plan (SBP) was created to enable a surviving beneficiary of a retired military service member to continue to receive a portion of the retiree's retirement benefits upon the death of the retiree...

  1. Assessment of river plan changes in Terengganu River using RS ...

    African Journals Online (AJOL)

    Journal of Fundamental and Applied Sciences ... The database can help in the appropriate understanding of river plan change and know ... The data collected from Geographic Information System (GIS) and Remote Sensing (RS) database.

  2. 30 CFR 285.605 - What is a Site Assessment Plan (SAP)?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What is a Site Assessment Plan (SAP)? 285.605... Assessment Plan (SAP)? (a) A SAP describes the activities (e.g., installation of meteorological towers... project easement, or to test technology devices. (1) Your SAP must describe how you will conduct your...

  3. Between structures and norms : Assessing tax increment financing for the Dutch spatial planning toolkit

    NARCIS (Netherlands)

    Root, Liz; Van Der Krabben, Erwin; Spit, Tejo

    2015-01-01

    The aim of the paper is to assess the institutional (mis)fit of tax increment financing for the Dutch spatial planning financial toolkit. By applying an institutionally oriented assessment framework, we analyse the interconnectivity of Dutch municipal finance and spatial planning structures and

  4. IRIS Assessment Plan for Ammonia and Ammonium Salts Noncancer Oral (Scoping and Problem Formulation Materials)

    Science.gov (United States)

    In April 2018, EPA released the draft IRIS Assessment Plan for Ammonia and Ammonium Salts Noncancer Oral. The IAP communicates to the public the plan for assessing each individual chemical and includes summary information on the IRIS Program’s scoping and initial proble...

  5. 78 FR 5830 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations...

    Science.gov (United States)

    2013-01-28

    ...-FXES11120800000F2-123-F2] Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... environmental assessment and proposed habitat conservation plan; request for comment. SUMMARY: We, the U.S. Fish...

  6. Watershed planning, implementation and assessment: the May River Watershed Action Plan case study

    Science.gov (United States)

    Kimberly W. Jones; Christopher L. Ellis; Jeremy S. Ritchie

    2016-01-01

    Prior to exponential growth in the early to mid-2000s, the Town of Bluffton, SC was one square mile; as of 2015, it is approximately 55 square miles. Associated with this growth was a shellfish harvesting closure for nearly onethird of the May River in 2009. The Town and its partners developed and began to implement the May River Watershed Action Plan in 2011. The plan...

  7. Using multilevel, multisource needs assessment data for planning community interventions.

    Science.gov (United States)

    Levy, Susan R; Anderson, Emily E; Issel, L Michele; Willis, Marilyn A; Dancy, Barbara L; Jacobson, Kristin M; Fleming, Shirley G; Copper, Elizabeth S; Berrios, Nerida M; Sciammarella, Esther; Ochoa, Mónica; Hebert-Beirne, Jennifer

    2004-01-01

    African Americans and Latinos share higher rates of cardiovascular disease (CVD) and diabetes compared with Whites. These diseases have common risk factors that are amenable to primary and secondary prevention. The goal of the Chicago REACH 2010-Lawndale Health Promotion Project is to eliminate disparities related to CVD and diabetes experienced by African Americans and Latinos in two contiguous Chicago neighborhoods using a community-based prevention approach. This article shares findings from the Phase 1 participatory planning process and discusses the implications these findings and lessons learned may have for programs aiming to reduce health disparities in multiethnic communities. The triangulation of data sources from the planning phase enriched interpretation and led to more creative and feasible suggestions for programmatic interventions across the four levels of the ecological framework. Multisource data yielded useful information for program planning and a better understanding of the cultural differences and similarities between African Americans and Latinos.

  8. The Relationship between Academic Performance and Elementary Student and Teacher Attitudes towards Departmentalizing

    Science.gov (United States)

    Freiberg, Elizabeth J.

    2014-01-01

    In response to the continued pressure placed on American public schools to increase academic achievement, some schools have begun to reorganize instructional environments in an effort to improve student outcomes. The current study examined one such elementary school that implemented a departmentalized model of instruction in fourth and fifth-grade…

  9. Sociological Stratification: Change and Continuity in the Distribution of Departmental Prestige, 1965-2007

    Science.gov (United States)

    Weakliem, David L.; Gauchat, Gordon; Wright, Bradley R. E.

    2012-01-01

    Previous research has found that there is a good deal of stability in departmental prestige, but has not considered its long-term dynamics. This paper investigates a hypothesis implied by some accounts in the sociology of science and organizational theory: that there will be a permanent component of prestige associated with the department or…

  10. The Woman Engineering Academic: An Investigation of Departmental and Institutional Environments. ASHE Annual Meeting Paper.

    Science.gov (United States)

    Benson, Sherron D.

    This study used grounded theory methodology to investigate the institutional and departmental climates of women engineering faculty. Seven female engineering faculty from two universities completed semi-structured interviews that were coded for common themes. All the participants indicated that they had had a natural interest or talent for science…

  11. The Woman Engineering Academic: An Investigation of Departmental and Institutional Environments.

    Science.gov (United States)

    McKendall, Sherron Benson

    2000-01-01

    Interviewed women engineering faculty at two universities to determine their experiences and perceptions of departmental and institutional environments. Most participants had experienced some type of isolation or singling out due to gender. Some questioned whether they were overreacting. Many had difficulty balancing home and work lives.…

  12. Quality assessment for VMAT prostate radiotherapy planning based on data envelopment analysis

    International Nuclear Information System (INIS)

    Lin, Kuan-Min; Simpson, John; Raith, Andrea; Ehrgott, Matthias; Sasso, Giuseppe

    2013-01-01

    The majority of commercial radiotherapy treatment planning systems requires planners to iteratively adjust the plan parameters in order to find a satisfactory plan. This iterative trial-and-error nature of radiotherapy treatment planning results in an inefficient planning process and in order to reduce such inefficiency, plans can be accepted without achieving the best attainable quality. We propose a quality assessment method based on data envelopment analysis (DEA) to address this inefficiency. This method compares a plan of interest to a set of past delivered plans and searches for evidence of potential further improvement. With the assistance of DEA, planners will be able to make informed decisions on whether further planning is required and ensure that a plan is only accepted when the plan quality is close to the best attainable one. We apply the DEA method to 37 prostate plans using two assessment parameters: rectal generalized equivalent uniform dose (gEUD) as the input and D95 (the minimum dose that is received by 95% volume of a structure) of the planning target volume (PTV) as the output. The percentage volume of rectum overlapping PTV is used to account for anatomical variations between patients and is included in the model as a non-discretionary output variable. Five plans that are considered of lesser quality by DEA are re-optimized with the goal to further improve rectal sparing. After re-optimization, all five plans improve in rectal gEUD without clinically considerable deterioration of the PTV D95 value. For the five re-optimized plans, the rectal gEUD is reduced by an average of 1.84 Gray (Gy) with only an average reduction of 0.07 Gy in PTV D95. The results demonstrate that DEA can correctly identify plans with potential improvements in terms of the chosen input and outputs. (paper)

  13. Monte Carlo conformal treatment planning as an independent assessment

    International Nuclear Information System (INIS)

    Rincon, M.; Leal, A.; Perucha, M.; Carrasco, E.; Sanchez-Doblado, F.; Hospital Univ. Virgen Macarena, Sevilla; Arrans, R.; Sanchez-Calzado, J.A.; Errazquin, L.; Medrano, J.C.

    2001-01-01

    The wide range of possibilities available in Radiotherapy with conformal fields cannot be covered experimentally. For this reason, dosimetrical and planning procedures are based on approximate algorithms or systematic measurements. Dose distribution calculations based on Monte Carlo (MC) simulations can be used to check results. In this work, two examples of conformal field treatments are shown: A prostate carcinoma and an ocular lymphoma. The dose distributions obtained with a conventional Planning System and with MC have been compared. Some significant differences have been found. (orig.)

  14. Building and measuring infrastructure and capacity for community health assessment and health improvement planning in Florida.

    Science.gov (United States)

    Abarca, Christine; Grigg, C Meade; Steele, Jo Ann; Osgood, Laurie; Keating, Heidi

    2009-01-01

    COMPASS (Comprehensive Assessment, Strategic Success) is the Florida Department of Health's community health assessment and health improvement planning initiative. Since 2002, COMPASS built state and county health department infrastructure to support a comprehensive, systematic, and integrated approach to community health assessment and planning. To assess the capacity of Florida's 67 county health departments (CHDs) to conduct community health assessment and planning and to identify training and technical assistance needs, COMPASS surveyed the CHDs using a Web-based instrument annually from 2004 through 2008. Response rate to the survey was 100 percent annually. In 2007, 96 percent of CHDs reported conducting assessment and planning within the past 3 years; 74 percent used the MAPP (Mobilizing for Action through Planning and Partnerships) framework. Progress was greater for the organizational and assessment phases of the MAPP-based work; only 10 CHDs had identified strategic priorities in 2007, and even fewer had implemented strategies for improving health. In 2007, the most frequently requested types of training were measuring success, developing goals and action plans, and using qualitative data; technical assistance was most frequently requested for program evaluation and writing community health status reports. Florida's CHDs have increased their capacity to conduct community health assessment and planning. Questions remain about sustaining these gains with limited resources.

  15. 43 CFR 46.210 - Listing of Departmental categorical exclusions.

    Science.gov (United States)

    2010-10-01

    ... business, including such things as supervision, administration, operations, maintenance, renovations, and... at all levels. (This does not exclude the preparation of environmental documents for proposals... Environment 10-Year Comprehensive Strategy Implementation Plan;” (3) Shall be conducted consistent with bureau...

  16. 75 FR 18259 - Departmental Offices; Debt Management Advisory Committee Meeting

    Science.gov (United States)

    2010-04-09

    ... decisions on major financing operations. Historically, this advice has been offered by debt management... Treasury's final announcement of financing plans may not reflect the recommendations provided in reports of... and financing estimates. This briefing will give the press an opportunity to ask questions about...

  17. 76 FR 20819 - Departmental Offices; Debt Management Advisory Committee Meeting

    Science.gov (United States)

    2011-04-13

    ... prior to making its final decisions on major financing operations. Historically, this advice has been.... 2, Sec. 3. Although the Treasury's final announcement of financing plans may not reflect the... statement of economic conditions and financing estimates. This briefing will give the press an opportunity...

  18. 76 FR 2952 - Departmental Offices; Debt Management Advisory Committee Meeting

    Science.gov (United States)

    2011-01-18

    ... decisions on major financing operations. Historically, this advice has been offered by debt management... Treasury's final announcement of financing plans may not reflect the recommendations provided in reports of... and financing estimates. This briefing will give the press an opportunity to ask questions about...

  19. 75 FR 1839 - Departmental Offices; Debt Management Advisory Committee Meeting

    Science.gov (United States)

    2010-01-13

    ... decisions on major financing operations. Historically, this advice has been offered by debt management... Treasury's final announcement of financing plans may not reflect the recommendations provided in reports of..., financing estimates and technical charts. This briefing will give the press an opportunity to ask questions...

  20. 77 FR 41476 - Departmental Offices; Debt Management Advisory Committee Meeting

    Science.gov (United States)

    2012-07-13

    ... decisions on major financing operations. Historically, this advice has been offered by debt management... Treasury's final announcement of financing plans may not reflect the recommendations provided in reports of... and financing estimates. This briefing will give the press an opportunity to ask questions about...

  1. 75 FR 63541 - Departmental Offices; Debt Management Advisory Committee Meeting

    Science.gov (United States)

    2010-10-15

    ... decisions on major financing operations. Historically, this advice has been offered by debt management... Treasury's final announcement of financing plans may not reflect the recommendations provided in reports of... and financing estimates. This briefing will give the press an opportunity to ask questions about...

  2. 78 FR 41832 - Departmental Offices; Debt Management Advisory Committee Meeting

    Science.gov (United States)

    2013-07-11

    ... making its final decisions on major financing operations. Historically, this advice has been offered by.... 2, Sec. 3. Although the Treasury's final announcement of financing plans may not reflect the... statement of economic conditions and financing estimates. This briefing will give the press an opportunity...

  3. 75 FR 39729 - Departmental Offices; Debt Management Advisory Committee Meeting

    Science.gov (United States)

    2010-07-12

    ... final decisions on major financing operations. Historically, this advice has been offered by debt.... Although the Treasury's final announcement of financing plans may not reflect the recommendations provided... economic conditions and financing estimates. This briefing will give the press an opportunity to ask...

  4. Assessment of Evacuation Protective Action Strategies For Emergency Preparedness Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Joomyung; Jae, Moosung [Hanyang Univ., Seoul (Korea, Republic of); Ahn, Kwangil [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-10-15

    This report which studies about evacuation formation suggests some considerable factors to reduce damage of radiological accidents. Additional details would be required to study in depth and more elements should be considered for updating emergency preparedness. However, this methodology with sensitivity analysis could adapt to specific plant which has total information such as geological data, weather data and population data. In this point of view the evacuation study could be contribute to set up emergency preparedness plan and propose the direction to enhance protective action strategies. In radiological emergency, residents nearby nuclear power plant should perform protective action that is suggested by emergency preparedness plan. The objective of emergency preparedness plan is that damages, such as casualties and environmental damages, due to radioactive accident should be minimized. The recent PAR study includes a number of subjects to improve the quality of protective action strategies. For enhancing protective action strategies, researches that evaluate many factors related with emergency response scenario are essential parts to update emergency preparedness plan. Evacuation is very important response action as protective action strategy.

  5. Assessment of Evacuation Protective Action Strategies For Emergency Preparedness Plan

    International Nuclear Information System (INIS)

    Lee, Joomyung; Jae, Moosung; Ahn, Kwangil

    2013-01-01

    This report which studies about evacuation formation suggests some considerable factors to reduce damage of radiological accidents. Additional details would be required to study in depth and more elements should be considered for updating emergency preparedness. However, this methodology with sensitivity analysis could adapt to specific plant which has total information such as geological data, weather data and population data. In this point of view the evacuation study could be contribute to set up emergency preparedness plan and propose the direction to enhance protective action strategies. In radiological emergency, residents nearby nuclear power plant should perform protective action that is suggested by emergency preparedness plan. The objective of emergency preparedness plan is that damages, such as casualties and environmental damages, due to radioactive accident should be minimized. The recent PAR study includes a number of subjects to improve the quality of protective action strategies. For enhancing protective action strategies, researches that evaluate many factors related with emergency response scenario are essential parts to update emergency preparedness plan. Evacuation is very important response action as protective action strategy

  6. Planning for Program Design and Assessment Using Value Creation Frameworks

    Science.gov (United States)

    Whisler, Laurel; Anderson, Rachel; Brown, Jenai

    2017-01-01

    This article explains a program design and planning process using the Value Creation Framework (VCF) developed by Wenger, Trayner, and de Laat (2011). The framework involves identifying types of value or benefit for those involved in the program, conditions and activities that support creation of that value, data that measure whether the value was…

  7. Study on environmental impact assessment of uranium mining and milling base planning

    International Nuclear Information System (INIS)

    Liu Xiaochao; Song Liquan

    2008-01-01

    Environmental impact assessment (EIA) of project planning is part of strategic EIA, which provides full consideration and evaluation of the potential environmental impact on tiered basis in the process of plan implementation. With account being taken of EIA of uranium mining/milling base and the current situation of mining/milling industry, this paper determined environmental protection objectives of EIA, screened assessment indexes and identified weighting factors. Based on the characteristics of mines planned, restrictive score values are estimated each for EIA weighting factor. Finally some suggestions were made for adjusting the plan. (authors)

  8. Improving the effectiveness of planning EIA (PEIA) in China: Integrating planning and assessment during the preparation of Shenzhen's Master Urban Plan

    International Nuclear Information System (INIS)

    Che Xiuzhen; English, Alex; Lu Jia; Chen, Yongqin David

    2011-01-01

    The enactment and implementation of the 2003 EIA Law in China institutionalised the role of plan environmental impact assessment (PEIA). While the philosophy, methodology and mechanisms of PEIA have gradually permeated through the various levels of government with a positive effect on the process and outcome of urban planning, only a few cities in China have so far carried out PEIA as a Strategic Environmental Assessment (SEA)-type procedure. One such case is the southern city of Shenzhen. During the past three decades, Shenzhen has grown from a small town to a large and booming city as China has successfully and rapidly developed its economy by adopting the 'reform and open door' policy. In response to the challenges arising from the generally divergent processes of rapid urbanisation, economic transformation and environment protection, Shenzhen has incrementally adopted the SEA concept in developing the city's Master Urban Plan. As such, this paper reviews the effectiveness of PEIA in three ways: ·as a tool and process for achieving more sustainable and strategic planning; ·to determine the level of integration of SEA within the planning system; and, ·its effectiveness vis-a-vis implementation. The implementation of PEIA within Shenzhen's Master Urban Plan offers important insights into the emergence of innovative practices in undertaking PEIA as well as theoretical contributions to the field, especially in exploring the relationship between PEIA and SEA and highlighting the central role of local governing institutions in SEA development.

  9. Cumulative effects in strategic environmental assessment: The influence of plan boundaries

    Energy Technology Data Exchange (ETDEWEB)

    Bidstrup, Morten, E-mail: bidstrup@plan.aau.dk [Aalborg University (Denmark); Kørnøv, Lone, E-mail: lonek@plan.aau.dk [Aalborg University (Denmark); Partidário, Maria Rosário, E-mail: mariapartidario@tecnico.ulisboa.pt [CEG-IST, Instituto Superior Técnico, Universidade de Lisboa (Portugal)

    2016-02-15

    Cumulative effects (CE) assessment is lacking quality in impact assessment (IA) worldwide. It has been argued that the strategic environmental assessment (SEA) provides a suitable IA framework for addressing CE because it is applied to developments with broad boundaries, but few have tested this claim. Through a case study on the Danish mining sector, this article explores how plan boundaries influence the analytical boundaries applied for assessing CE in SEA. The case was studied through document analysis in combination with semi-structured group interviews of the responsible planners, who also serve as SEA practitioners. It was found that CE are to some extent assessed and managed implicitly throughout the planning process. However, this is through a focus on lowering the cumulative stress of mining rather than the cumulative stress on and capacity of the receiving environment. Plan boundaries do influence CE assessment, though all boundaries are not equally influential. The geographical and time boundaries of the Danish mining plans are broad or flexible enough to accommodate a meaningful assessment of CE, but the topical boundary is restrictive. The study indicates that collaboration among planning authorities and legally appointed CE leadership may facilitate better practice on CE assessment in sector-specific SEA contexts. However, most pressing is the need for relating assessment to the receiving environment as opposed to solely the stress of a proposed plan.

  10. Cumulative effects in strategic environmental assessment: The influence of plan boundaries

    International Nuclear Information System (INIS)

    Bidstrup, Morten; Kørnøv, Lone; Partidário, Maria Rosário

    2016-01-01

    Cumulative effects (CE) assessment is lacking quality in impact assessment (IA) worldwide. It has been argued that the strategic environmental assessment (SEA) provides a suitable IA framework for addressing CE because it is applied to developments with broad boundaries, but few have tested this claim. Through a case study on the Danish mining sector, this article explores how plan boundaries influence the analytical boundaries applied for assessing CE in SEA. The case was studied through document analysis in combination with semi-structured group interviews of the responsible planners, who also serve as SEA practitioners. It was found that CE are to some extent assessed and managed implicitly throughout the planning process. However, this is through a focus on lowering the cumulative stress of mining rather than the cumulative stress on and capacity of the receiving environment. Plan boundaries do influence CE assessment, though all boundaries are not equally influential. The geographical and time boundaries of the Danish mining plans are broad or flexible enough to accommodate a meaningful assessment of CE, but the topical boundary is restrictive. The study indicates that collaboration among planning authorities and legally appointed CE leadership may facilitate better practice on CE assessment in sector-specific SEA contexts. However, most pressing is the need for relating assessment to the receiving environment as opposed to solely the stress of a proposed plan.

  11. Considerations for using data envelopment analysis for the assessment of radiotherapy treatment plan quality.

    Science.gov (United States)

    Simpson, John; Raith, Andrea; Rouse, Paul; Ehrgott, Matthias

    2017-10-09

    Purpose The operations research method of data envelopment analysis (DEA) shows promise for assessing radiotherapy treatment plan quality. The purpose of this paper is to consider the technical requirements for using DEA for plan assessment. Design/methodology/approach In total, 41 prostate treatment plans were retrospectively analysed using the DEA method. The authors investigate the impact of DEA weight restrictions with reference to the ability to differentiate plan performance at a level of clinical significance. Patient geometry influences plan quality and the authors compare differing approaches for managing patient geometry within the DEA method. Findings The input-oriented DEA method is the method of choice when performing plan analysis using the key undesirable plan metrics as the DEA inputs. When considering multiple inputs, it is necessary to constrain the DEA input weights in order to identify potential plan improvements at a level of clinical significance. All tested approaches for the consideration of patient geometry yielded consistent results. Research limitations/implications This work is based on prostate plans and individual recommendations would therefore need to be validated for other treatment sites. Notwithstanding, the method that requires both optimised DEA weights according to clinical significance and appropriate accounting for patient geometric factors is universally applicable. Practical implications DEA can potentially be used during treatment plan development to guide the planning process or alternatively used retrospectively for treatment plan quality audit. Social implications DEA is independent of the planning system platform and therefore has the potential to be used for multi-institutional quality audit. Originality/value To the authors' knowledge, this is the first published examination of the optimal approach in the use of DEA for radiotherapy treatment plan assessment.

  12. Mathematical Assessment of Canada’s Pandemic Influenza Preparedness Plan

    Directory of Open Access Journals (Sweden)

    Abba B Gumel

    2008-01-01

    Full Text Available OBJECTIVE: The presence of the highly pathogenic avian H5N1 virus in wild bird populations in several regions of the world, together with recurrent cases of H5N1 influenza arising primarily from direct contact with poultry, have highlighted the urgent need for prepared-ness and coordinated global strategies to effectively combat a potential influenza pandemic. The purpose of the present study was to evaluate the Canadian pandemic influenza preparedness plan.

  13. Applying programmatic risk assessment to nuclear materials stabilization R and D planning

    International Nuclear Information System (INIS)

    Brown-Van Hoozer, S.A.; Kenley, C.R.

    1997-01-01

    A systems engineering approach to programmatic risk assessment, derived from the aerospace industry, was applied to various stabilization technologies to assess their relative maturity and availability for use in stabilizing nuclear materials. The assessment provided valuable information for trading off available technologies and identified the at-risk technologies that will require close tracking by the Department of Energy (DOE) to mitigate programmatic risks. This paper presents the programmatic risk assessment methodology developed for the 1995 R and D Plan and updated for the 1996 R and D Plan. Results of the 1996 assessment also are presented (DOE/ID-10561, 1996)

  14. Beyond Student Learning Outcomes: Developing Comprehensive, Strategic Assessment Plans for Advising Programmes

    Science.gov (United States)

    McClellan, Jeffrey L.

    2011-01-01

    This article argues that while the importance of assessment in academic advising is clear and the current emphasis on defining and measuring student learning outcomes represents an essential component of any comprehensive advising assessment plan, an even more comprehensive understanding of programme assessment is needed. Drawing upon business…

  15. Field assessment of a model tuberculosis outbreak response plan for low-incidence areas

    Directory of Open Access Journals (Sweden)

    Pascopella Lisa

    2007-10-01

    Full Text Available Abstract Background For a regional project in four low-incidence states, we designed a customizable tuberculosis outbreak response plan. Prior to dissemination of the plan, a tuberculosis outbreak occurred, presenting an opportunity to perform a field assessment of the plan. The purpose of the assessment was to ensure that the plan included essential elements to help public health professionals recognize and respond to outbreaks. Methods We designed a semi-structured questionnaire and interviewed all key stakeholders involved in the response. We used common themes to assess validity of and identify gaps in the plan. A subset of participants provided structured feedback on the plan. Results We interviewed 11 public health and six community stakeholders. The assessment demonstrated that (1 almost all of the main response activities were reflected in the plan; (2 the plan added value by providing a definition of a tuberculosis outbreak and guidelines for communication and evaluation. These were areas that lacked written protocols during the actual outbreak response; and (3 basic education about tuberculosis and the interpretation and use of genotyping data were important needs. Stakeholders also suggested adding to the plan questions for evaluation and a section for specific steps to take when an outbreak is suspected. Conclusion An interactive field assessment of a programmatic tool revealed the value of a systematic outbreak response plan with a standard definition of a tuberculosis outbreak, guidelines for communication and evaluation, and response steps. The assessment highlighted the importance of education and training for tuberculosis in low-incidence areas.

  16. The Practice of Guangzhou Port Planning Environmental Impact Assessment

    Science.gov (United States)

    Wang, Ning; Zhao, Junjie; Shou, Youping; Qiao, Jianzhe; Dong, Shipei; Zhang, Lu

    2018-01-01

    In this paper, the effects of the implementation of Guangzhou port plan were analyzed from hydrological condition, water environment and ecological environment. Regional water environmental carrying capacity was analyzed. Guangzhou port is a main port in the coast of China, it is an important port of foreign trade in south China, it is an important port for energy supplies and raw materials in Guangdong province [1]. With the shipping channel condition improvement and the construction of large specialized container port area, Guangzhou port will gradually become trunk line port of container transport in south China.

  17. Institutional Effectiveness Plan: Assessing Effectiveness To Improve Service and Increase Accountability.

    Science.gov (United States)

    Quinley, John W.; And Others

    This institutional effectiveness plan for Central Piedmont Community College (CPCC) is designed to serve as the blueprint by which assessment activities are undertaken and results disseminated throughout the college. First, Chapter One provides an overview of CPCC's self-study planning process, indicating that a 33-member task force comprised of…

  18. Use of risk assessment panels during revision of the Tongass Land and Resource Management Plan.

    Science.gov (United States)

    Charles G. Shaw

    1999-01-01

    This paper describes the process used to conduct the 16 risk assessment panels and a subsistence working group held during revision of the Tongass land management plan. It provides an overview of how results from the panels were used by forest managers in plan-related decisionmaking, discusses some reactions to the effort, and identifies some opportunities to improve...

  19. School Health Index: A Self-Assessment and Planning Guide. Middle School/High School.

    Science.gov (United States)

    Barrios, Lisa C.; Burgeson, Charlene R.; Crossett, Linda; Harrykissoon, Samantha D.; Pritzl, Jane; Wechsler, Howell; Kuester, Sarah A.; Pederson, Linda; Graffunder, Corinne; Rainford, Neil; Sleet, David

    2004-01-01

    The "School Health Index" is a self-assessment and planning guide that will enable schools to: (1) identify the strengths and weaknesses of school policies and programs for promoting health and safety; (2) develop an action plan for improving student health and safety, and (3) involve teachers, parents, students, and the community in improving…

  20. Emergency planning, response and assessment: a concept for a center of excellence

    International Nuclear Information System (INIS)

    Dickerson, M.H.

    1986-01-01

    This paper discusses a general concept for a center of excellence devoted to emergency planning, response and assessment. A plan is presented to implement the concept, based on experience gained from emergency response as it relates to the nuclear and toxic chemical industries. The role of the World Laboratory in this endeavor would complement and enhance other organizations than are involved in related activities

  1. 76 FR 62087 - Draft Conservation Plan and Draft Environmental Assessment; Dunes Sagebrush Lizard, Texas

    Science.gov (United States)

    2011-10-06

    ...] Draft Conservation Plan and Draft Environmental Assessment; Dunes Sagebrush Lizard, Texas AGENCY: Fish... draft Texas Conservation Plan for the Dunes Sagebrush Lizard (TCP). The draft TCP will function as a... the Applicant for the dunes sagebrush lizard (Sceloporus arenicolus) throughout its range in Texas...

  2. Assessment of quality of care in family planning services in Jimma ...

    African Journals Online (AJOL)

    Background: Providing quality of care in family planning services is an important task for care providers so as to increase service utilization and coverage; however, little is known about the existing quality of care in such services. Objective: To assess quality of care in family planning services in Jimma Zone, southwest ...

  3. Reliably Assessing the Effectiveness of a Plan Using Models of Varying Fidelity and Under Time Constraints

    NARCIS (Netherlands)

    Jong, S. de; Noordkamp, H.W.; Poel, N.C.L. van der; Smit, S.K.

    2015-01-01

    Assessing the effectiveness of a plan, given multiple potential scenarios, is a common problem for analysts, especially in the military domain. This problem can seriously impact the safety of the people that are involved in planned missions. More precisely, the availability of multiple models, with

  4. Interagency Functional Transformation Current and Emerging Departmental Relationships

    National Research Council Canada - National Science Library

    Beydler, William

    2003-01-01

    .... Transformation is clearly a priority of U.S. national leadership. A review of the history of that evolution and assessment of the current interagency relationships can suggest options to complete the process...

  5. 75 FR 66038 - Planning Resource Adequacy Assessment Reliability Standard

    Science.gov (United States)

    2010-10-27

    ..., providing a common framework for resource adequacy analysis, assessment, and documentation) effectively and...://www.nerc.com/commondocs.php?cd=2 . D. Proposed Effective Date 24. Proposed regional Reliability...

  6. Joining up health and planning: how Joint Strategic Needs Assessment (JSNA) can inform health and wellbeing strategies and spatial planning.

    Science.gov (United States)

    Tomlinson, Paul; Hewitt, Stephen; Blackshaw, Neil

    2013-09-01

    There has been a welcome joining up of the rhetoric around health, the environment and land use or spatial planning in both the English public health white paper and the National Planning Policy Framework. However, this paper highlights a real concern that this is not being followed through into practical guidance needed by local authorities (LAs), health bodies and developers about how to deliver this at the local level. The role of Joint Strategic Needs Assessments (JSNAs) and Health and Wellbeing Strategies (HWSs) have the potential to provide a strong basis for integrated local policies for health improvement, to address the wider determinants of health and to reduce inequities. However, the draft JSNA guidance from the Department of Health falls short of providing a robust, comprehensive and practical guide to meeting these very significant challenges. The paper identifies some examples of good practice. It recommends that action should be taken to raise the standards of all JSNAs to meet the new challenges and that HWSs should be aligned spatially and temporally with local plans and other LA strategies. HWSs should also identify spatially targeted interventions that can be delivered through spatial planning or transport planning. Steps need to be taken to ensure that district councils are brought into the process.

  7. The Impact of Vocational Assessment Information on the Individualized Education Planning Process. Supporting Curriculum-Based Assessment.

    Science.gov (United States)

    Stodden, Robert A.; And Others

    1989-01-01

    Educational records of 127 secondary students with disabilities were reviewed to assess impact of vocational assessment information in Individualized Education Plan (IEP) development process. Results focus on the impact of information on the number of IEP vocational goals and objectives written, kinds of IEP items written, and number of IEP goals…

  8. 2011 FEMA Risk Mapping, Assessment, and Planning (Risk MAP) Lidar: Nashua River Watershed (Massachusetts, New Hampshire)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — These data are the lidar points collected for FEMA Risk Mapping, Assessment, and Planning (Risk MAP) for the Nashua River Watershed. This area falls in portions of...

  9. Integration of environmental flow assessment and freshwater conservation planning: a new era in catchment management

    CSIR Research Space (South Africa)

    Nel, JL

    2011-03-01

    Full Text Available Integrated water resources management offers an ideal platform for addressing the goals of freshwater conservation and climate change adaptation. Environmental flow assessment and systematic conservation planning have evolved separately...

  10. Planned home birth in the United States and professionalism: a critical assessment.

    Science.gov (United States)

    Chervenak, Frank A; McCullough, Laurence B; Grünebaum, Amos; Arabin, Birgit; Levene, Malcolm I; Brent, Robert L

    2013-01-01

    Planned home birth has been considered by some to be consistent with professional responsibility in patient care. This article critically assesses the ethical and scientific justification for this view and shows it to be unjustified. We critically assess recent statements by professional associations of obstetricians, one that sanctions and one that endorses planned home birth. We base our critical appraisal on the professional responsibility model of obstetric ethics, which is based on the ethical concept of medicine from the Scottish and English Enlightenments of the 18th century. Our critical assessment supports the following conclusions. Because of its significantly increased, preventable perinatal risks, planned home birth in the United States is not clinically or ethically benign. Attending planned home birth, no matter one's training or experience, is not acting in a professional capacity, because this role preventably results in clinically unnecessary and therefore clinically unacceptable perinatal risk. It is therefore not consistent with the ethical concept of medicine as a profession for any attendant to planned home birth to represent himself or herself as a "professional." Obstetric healthcare associations should neither sanction nor endorse planned home birth. Instead, these associations should recommend against planned home birth. Obstetric healthcare professionals should respond to expressions of interest in planned home birth by pregnant women by informing them that it incurs significantly increased, preventable perinatal risks, by recommending strongly against planned home birth, and by recommending strongly for planned hospital birth. Obstetric healthcare professionals should routinely provide excellent obstetric care to all women transferred to the hospital from a planned home birth.The professional responsibility model of obstetric ethics requires obstetricians to address and remedy legitimate dissatisfaction with some hospital settings and

  11. Framework for transforming departmental culture to support educational innovation

    Directory of Open Access Journals (Sweden)

    Joel C. Corbo

    2016-02-01

    Full Text Available [This paper is part of the Focused Collection on Preparing and Supporting University Physics Educators.] This paper provides a research-based framework for promoting institutional change in higher education. To date, most educational change efforts have focused on relatively narrow subsets of the university system (e.g., faculty teaching practices or administrative policies and have been largely driven by implicit change logics; both of these features have limited the success of such efforts at achieving sustained, systemic change. Drawing from the literature on organizational and cultural change, our framework encourages change agents to coordinate their activities across three key levels of the university and to ground their activities in the various change perspectives that emerge from that literature. We use examples from a change project that we have been carrying out at a large research university to illustrate how our framework can be used as a basis for planning and implementing holistic change.

  12. Library Space: Assessment and Planning through a Space Utilization Study.

    Science.gov (United States)

    Prentice, Katherine A; Argyropoulos, Erica K

    2018-01-01

    The objective of this article is to describe the recent space and furniture utilization study conducted through direct observation at the small, academic-centered Schusterman Library. Student workers from the library's reference desk monitored two semesters of use and went on to observe a third semester after electrical power upgrades were installed. Extensive use details were collected about where library patrons sat during which parts of the day, and certain areas of the library were ultimately identified as much more active than others. Overall, the information gathered proved useful to library planning and will be valuable to future space initiatives. This article further demonstrates feasible means for any library to implement a similar study with minimal resources.

  13. Enterprise resource planning: An assessment for readiness to change

    Directory of Open Access Journals (Sweden)

    Ali Ashraf Nazari

    2014-01-01

    Full Text Available This paper presents an empirical investigation for the implementation of enterprise resource planning among 58 production units in province of Ilam, Iran. The proposed study of this paper considers the readiness in terms of six factors including human resources, financial resources, infrastructures, quality control, and information systems and communication technology. Using structural equation modeling, the study examines six hypotheses and the implementation is accomplished on LISREL software package. Cronbach alpha has been calculated as 0.91, which is well above the minimum desirable level. The results of the survey have indicated that all six mentioned factors influence positively on ERP implementation and for a successful implementation of ERP, it is suggested to consider these factors, seriously.

  14. Integrating impact assessment and conflict management in urban planning: Experiences from Finland

    International Nuclear Information System (INIS)

    Peltonen, Lasse; Sairinen, Rauno

    2010-01-01

    The article examines the interlinkages between recent developments in conflict management and impact assessment procedures in the context of urban planning in Finland. It sets out by introducing the fields of impact assessment and conflict mediation. It then proceeds to discuss the development of impact assessment practices and the status of conflict mediation in Finnish land use planning. The case of Korteniitty infill development plan in Jyvaeskylae is used to demonstrate how the Finnish planning system operates in conflict situations - and how social impact assessment can contribute to managing planning conflicts. The authors ask how the processes of impact assessment contribute to conflict management. Based on the Finnish experience, it is argued that social impact assessment of land use plans can contribute to conflict management, especially in the absence of institutionalised conflict mediation processes. In addition, SIA may acquire features of conflict mediation, depending on extent and intensity of stakeholder participation in the process, and the quality of linkages it between knowledge production and decision-making. Simultaneously, conflict mediation practices and theoretical insights can inform the application of SIA to help it address land use conflicts more consciously.

  15. Risky business: Assessing cleanup plans for waste sites

    International Nuclear Information System (INIS)

    Blaylock, B.

    1995-01-01

    ORNL was chosen to perform human health and ecological risk assessments for DOE because of its risk assessment expertise. The U.S. Department of Energy's many production and research sites contain radioactive and hazardous wastes. These waste sites pose potential risks to the health and safety of remediation and waste management workers and the public. The risks, however, vary from site to site. Some sites undoubtedly present larger risks than others and should be cleaned up first. However, before the cleanup begins, DOE is required by law to prepare an environmental impact statement on any actions that may significantly affect the environment-even actions that would clean it up

  16. A global assessment of Holistic Planned Grazing™ compared with ...

    African Journals Online (AJOL)

    Previous reviews have found similar or greater plant and animal production in continuous (season-long) compared with rotational grazing. Here season-long continuous grazing is compared with HPG alone to explore the evidence for animal impact. Three quantitative meta-analysis models were used to assess data sets ...

  17. NTL Data Management Planning "Greenout" Bingo Self Assessment Tool

    Science.gov (United States)

    2016-08-11

    This tool is designed to help assess your current data management practices. Pick a dataset or research project, sit down with your data collection team, and discuss each prompt below. This tool can guide DMP improvement by revealing best practices t...

  18. TRACKING AND MONITORING OF TAGGED OBJECTS EMPLOYING PARTICLE SWARM OPTIMIZATION ALGORITHM IN A DEPARTMENTAL STORE

    Directory of Open Access Journals (Sweden)

    Indrajit Bhattacharya

    2011-05-01

    Full Text Available The present paper proposes a departmental store automation system based on Radio Frequency Identification (RFID technology and Particle Swarm Optimization (PSO algorithm. The items in the departmental store spanned over different sections and in multiple floors, are tagged with passive RFID tags. The floor is divided into number of zones depending on different types of items that are placed in their respective racks. Each of the zones is placed with one RFID reader, which constantly monitors the items in their zone and periodically sends that information to the application. The problem of systematic periodic monitoring of the store is addressed in this application so that the locations, distributions and demands of every item in the store can be invigilated with intelligence. The proposed application is successfully demonstrated on a simulated case study.

  19. Departmentalization and Organizational Context: The Experience of the University of Guadalajara

    OpenAIRE

    Adrián Acosta Silva

    2005-01-01

    This work consists of an evaluation of the experience of organizational reform and academic departmentalization at a Mexican public university, the University of Guadalajara (U. of G.), occurred in the period of 1994-2005. It is a research carried out from the perspective of the institutional change analysis, which obeys the interest of carrying out a rigorous evaluation of the process, after 11 years of its institutional operation. From a reconstruction of the context that gave origin and se...

  20. Radioecology-related health physics and radiological protection. Departmental research programme of the BMU. Colloquium proceedings

    International Nuclear Information System (INIS)

    Wirth, E.; Pohl, H.

    1999-08-01

    The conference report covers the full texts of the 18 papers presented at the conference, as well as the contributions to the discussions. Except for two of the 18 papers, which set out the objectives and subjects of the departmental research programmes of the BMU, subject analysis and indexing has been done for individual retrieval of the papers from the database. (orig./CB) [de

  1. [A study on the departmental distribution of mortality by cause: some evidence concerning two populations].

    Science.gov (United States)

    Damiani, P; Masse, H; Aubenque, M

    1984-01-01

    The distributions of proportions of deaths by cause are analyzed for each department of France by sex for the age group 45 to 64. The data are official French departmental data on causes of death for the period 1968-1970. The authors conclude that these distributions are the sum of two log-normal distributions. They also identify the existence of two populations according to whether the cause of death was endogenous or exogenous. (summary in ENG)

  2. Performance, labour flexibility and migrant workers in hotels: An establishment and departmental level analysis

    OpenAIRE

    Yaduma, N; Williams, A; Lockwood, A; Park, S

    2015-01-01

    © 2015. This paper analyses flexible working, and the employment of migrants, as determinants of performance in hotels, utilising a highly disaggregated data set of actual hours worked and outputs, on a monthly basis, over an 8 year period for 25 establishments within a single firm. It examines not only inter-establishment, but also intra-establishment (departmental) variations in performance. The analysis also systematically compares the findings based on financial versus physical measures, ...

  3. Assessing environmental assets for health promotion program planning: a practical framework for health promotion practitioners.

    Science.gov (United States)

    Springer, Andrew E; Evans, Alexandra E

    2016-01-01

    Conducting a health needs assessment is an important if not essential first step for health promotion planning. This paper explores how health needs assessments may be further strengthened for health promotion planning via an assessment of environmental assets rooted in the multiple environments (policy, information, social and physical environments) that shape health and behavior. Guided by a behavioral-ecological perspective- one that seeks to identify environmental assets that can influence health behavior, and an implementation science perspective- one that seeks to interweave health promotion strategies into existing environmental assets, we present a basic framework for assessing environmental assets and review examples from the literature to illustrate the incorporation of environmental assets into health program design. Health promotion practitioners and researchers implicitly identify and apply environmental assets in the design and implementation of health promotion interventions;this paper provides foundation for greater intentionality in assessing environmental assets for health promotion planning.

  4. Progress in inter-departmental audit: the Midlands experience

    International Nuclear Information System (INIS)

    Bonnett, D.E.; Aukett, R.J.; Powley, S.K.

    1995-01-01

    In ensuring the safety of patients in radiotherapy problems can arise from systematic errors in: the basic data, beam calibration, treatment planning or in the regular measurement of machine parameters. One possible method of identifying any such problems is by the use of an audit carried out by another department. In order to devise and test an audit system a co-operative venture between the physics departments at the Walsgrave Hospital, Coventry and the Leicester Royal Infirmary was initiated in 1991 and reported by us at the last biennial meeting. The audit was confined to external beam therapy i.e. electron and photon beams and each audit covered only one machine and one modality. This pilot audit proved to be highly practical, cost effective and of definite benefit. This has now been extended to include the 9 other centres which cover the (English) Midlands: Birmingham, Coventry, Derby, Leicester, Lincoln, Nottingham, Northampton, Stoke-on-Trent and Woverhampton. The group has now been operating for three years, each annual cycle starting in May. In 1993/94 the auditors identified 67 aspects of local Quality Assurance procedures and records which required attention: 29 in basic dosimetry, 23 in machine performance and 15 in machine calibration. In no case was any of these serious. There was considerable variation in the range and frequency of the various checks performed. The errors in the depth doses and field factors measured were in the range -5.5 to +3.5 %. In the planned treatment to a trapezoidal water phantom the errors were in the range -4.0 to +2.0 %. The larger errors occurred only in extreme conditions, which this particular audit is designed to test, and would not have had any significant clinical effect. Nevertheless, a number of possible improvements in depth doses, beam profiles and treatment time calculations were identified. The presentation will include the results of the 1994/95 audit and will discuss any identifiable trends over the three

  5. A human factors needs assessment and planning study

    International Nuclear Information System (INIS)

    Price, H.E.; Van Cott, H.P.

    1982-06-01

    A study was done to assess the need for human factors research, development, and regulatory action in the Atomic Energy Control Board. Further study or development in nine human factors areas is proposed. The urgency, schedule, and resources judged to be necessary for the proposed efforts are estimated. Special emphasis is placed on the need for task analysis information, for the evaluation of control room and maintenance human engineering, and for the development of an improved human error reporting system

  6. Implementation of a departmental picture archiving and communication system: a productivity and cost analysis.

    Science.gov (United States)

    Macyszyn, Luke; Lega, Brad; Bohman, Leif-Erik; Latefi, Ahmad; Smith, Michelle J; Malhotra, Neil R; Welch, William; Grady, Sean M

    2013-09-01

    Digital radiology enhances productivity and results in long-term cost savings. However, the viewing, storage, and sharing of outside imaging studies on compact discs at ambulatory offices and hospitals pose a number of unique challenges to a surgeon's efficiency and clinical workflow. To improve the efficiency and clinical workflow of an academic neurosurgical practice when evaluating patients with outside radiological studies. Open-source software and commercial hardware were used to design and implement a departmental picture archiving and communications system (PACS). The implementation of a departmental PACS system significantly improved productivity and enhanced collaboration in a variety of clinical settings. Using published data on the rate of information technology problems associated with outside studies on compact discs, this system produced a cost savings ranging from $6250 to $33600 and from $43200 to $72000 for 2 cohorts, urgent transfer and spine clinic patients, respectively, therefore justifying the costs of the system in less than a year. The implementation of a departmental PACS system using open-source software is straightforward and cost-effective and results in significant gains in surgeon productivity when evaluating patients with outside imaging studies.

  7. Achieving quality in a government hospital: departmental responsibility.

    Science.gov (United States)

    Haron, Yafa; Segal, Zvi; Barhoum, Masad

    2009-01-01

    Quality improvement in health care organizations requires structural reorganization and system reform and the development of an appropriate organizational "culture." In 2007, the Division of Quality and Excellence in Civil Service in Israel developed a concept to improve quality management in governmental institutions throughout the country. To put this strategy into practice, Western Galilee Hospital, a governmental hospital, in northern Israel, developed a plan to advance the quality management system where each department and unit is autonomously responsible for its own quality and excellence. Since the hospital has been certificated by ISO 9001 for more than 10 years (the only hospital in Israel to have this certificate), the main challenge now is to improve the quality and excellence system in every department. The aim of this article is to describe the implementation of a comprehensive program designed to raise the ability of managers and workers in Western Galilee Hospital in addressing all of the government's requirements for quality and excellence in service in Israel.

  8. Doctoral Advisor-Advisee Pairing in STEM Fields: Selection Criteria and Impact of Faculty, Student and Departmental Factors

    Directory of Open Access Journals (Sweden)

    Simy Joy

    2015-09-01

    Full Text Available Unlike the doctoral programs in places where students are paired with advisors at the time of admission itself, most US programs require the students to choose their advisors, and the advisors to formally accept the students as advisees. Little research has been done to understand how students and faculty approach this mutual selection and pairing process. This paper examines this process in STEM departments (Science, Technology, Engineering and Mathematics, with specific focus on factors influencing the decisions. Based on focus groups and interviews of doctoral students and faculty from STEM departments in an American university, we identify criteria applied by students and faculty in making their choices. Students were found to assess faculty on available funding, area of research, personality, ability to graduate students fast, and career prospects for students, and faculty to assess students on their qualifications/credentials and perceived ability to contribute to research. We also found that this mutual assessment was not objective, but influenced by perceptions associated with faculty gender and career stage, and student nationality. In the end, whether students and faculty were actually paired with persons of their choice depended on departmental factors including prevalent pairing practices, restrictions on student numbers per faculty, and reward structure. We discuss implications of the findings for research and practice.

  9. Assessment of individual doses and intervention planning at CERN

    International Nuclear Information System (INIS)

    Brugger, M.; Forkel-Wirth, D.; Gaborit, J.C.; Menzel, H.; Roesler, S.

    2006-01-01

    Founded in 1954, CERN is the European Organization for Nuclear Research, one of the world's largest international particle physics centres. It sits astride the Franco-Swiss border near Geneva. The Large Hadron Collider (LHC) is currently being installed in a 27-kilometer ring tunnel, buried deep below the countryside on the outskirts of Geneva, Switzerland and the Pays de Gex, France. When its operation begins in 2007, the LHC will be the world's most power particle accelerator. The start-up and the operation of the LHC will mark a new era for CERN's operational radiation protection. The total surface of CERN's radiation areas will enlarge significantly and a large number of work places have to be regularly monitored by CERN's radiation protection group. The maintenance personnel will comprise CERN staff, outside contractors and a large number of physicists from all over the world. CERN meets this challenge by applying optimisation processes already in the design of accelerator and detector components and by an appropriate intervention and dose planning during operation. Detailed Monte Carlo calculations were performed during the design phase of the LHC and were used to identify the potential radiation hazards during future maintenance in areas with elevated beam losses (accelerator ejection and injection, beam dumps, target areas or beam cleaning insertions) and thus elevated dose rates. In an iterative way, the design of the accelerator components and the layout of these regions were optimised. The impact of the proposed modifications on the dose to personnel was evaluated by Monte Carlo simulations. Calculated individual and collective doses were then compared to design constraints. (author)

  10. Assessment of Individual Doses and Intervention Planning at CERN

    International Nuclear Information System (INIS)

    Brugger, M.; Forkel-Wirth, D.; Gaborit, J.C.; Menzel, H.; Roesler, S.; Vincke, H.

    2006-01-01

    Founded in 1954, CERN is the European Organization for Nuclear Research, one of the world's largest international particle physics centres. It sits astride the Franco-Swiss border near Geneva. The Large Hadron Collider (Lhc) is currently being installed in a 27-kilometer ring tunnel, buried deep below the countryside on the outskirts of Geneva, Switzerland and the Pays de Gex, France. When its operation begins in 2007, the Lhc will be the world's most powerful particle accelerator. The start-up and the operation of the Lhc will mark a new era for CERN's operational radiation protection. The total surface of CERN's radiation areas will enlarge significantly and a large number of work places have to be regularly monitored by CERN's radiation protection group. The maintenance personnel will comprise CERN staff, outside contractors and a large number of physicists from all over the world. CERN meets this challenge by applying optimisation processes already in the design of accelerator and detector components and by an appropriate intervention and dose planning during operation. Detailed Monte Carlo calculations were performed during the design phase of the Lhc and were used to identify the potential radiation hazards during future maintenance in areas with elevated beam losses (accelerator ejection and injection, beam dumps, target areas or beam cleaning insertions) and thus elevated dose rates. In an iterative way, the design of the accelerator components and the layout of these regions were optimised. The impact of the proposed modifications on the dose to personnel was evaluated by Monte Carlo simulations. Calculated individual and collective doses were then compared to design constraints. (authors)

  11. IT services in a completely digitized radiological department: value and benefit of an in-house departmental IT group

    International Nuclear Information System (INIS)

    Treitl, M.; Wirth, S.; Lucke, A.; Rieger, J.; Pfeifer, K.J.; Reiser, M.; Villain, S.

    2005-01-01

    To analyze the benefit of a departmental IT group in comparison to support by hospital IT groups or system manufacturers in a completely digitized radiological department. The departmental IT group comprises a fulltime IT specialist, two student assistants and four clinical employees participating 1 day/week. For 18 months IT problems were quantified and specified according to urgency, responsibility and affected system by use of an intranet-based reporting system. For each IT service provider the performance and duration of problem solution was evaluated. In 18 months 3,234 IT problems emerged. 88.7% were solved by the departmental IT group. In 474 cases (14.7%) a solution within 2 h was required. The departmental IT group solved 35.8% within 30 min, system manufacturers needed 18 h 38 min in mean. The departmental IT group solved 90.2% of the problems within a time limit. System manufacturers met the limit in 60.1% with a mean duration of 7 days 21 h. In 6.7% of the cases, support by system manufacturers was indispensable. A considerable proportion of IT problems in completely digitized radiological departments can be solved by a departmental IT group, providing a fast and cost-efficient first-level IT support with effective prevention of major breaks in the workflow. In a small number of cases support by system manufacturers remains necessary. (orig.)

  12. IRIS Assessment Plan for Nitrate and Nitrite (Scoping and Problem Formulation Materials)

    Science.gov (United States)

    In September 2017, EPA released the draft IRIS Assessment Plan (IAP) for Nitrate and Nitrite for public review and comment. This document was discussed at an EPA Science Advisory Board (SAB) Chemical Assessment Advisory Committee (CAAC) meeting on September 27-28, 2017....

  13. Waste convention regulatory impact on planning safety assessment for LILW disposal in Croatia

    International Nuclear Information System (INIS)

    Valcic, I.; Subasic, D.; Lokner, V.

    2000-01-01

    Preparations for establishment of a LILW repository in Croatia have reached a point where a preliminary safety assessment for the prospective facility is being planned. The planning is not based upon the national regulatory framework, which does not require such an assessment at this early stage, but upon the interagency BSS and the IAEA RADWASS programme recommendations because the national regulations are being revised with express purpose to conform to the most recent international standards and good practices. The Waste Convention, which Croatia has ratified in the meantime, supports this approach in principle, but does not appear to have more tangible regulatory relevance for the safety assessment planning. Its actual requirements regarding safety analyses for a repository fall short of the specific assessment concepts practiced in this decade, and could have well been met by the old Croatian regulations from the mid-eighties. (author)

  14. Integrated Assessment Plan Template and Operational Demonstration for SPIDERS Phase 2: Fort Carson

    Energy Technology Data Exchange (ETDEWEB)

    Barr, Jonathan L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tuffner, Francis K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hadley, Mark D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kreyling, Sean J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Schneider, Kevin P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-09-01

    This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collected from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).

  15. Indicators' role: How do they influence Strategic Environmental Assessment and Sustainable Planning - The Chinese experience.

    Science.gov (United States)

    Gao, Jingjing; Christensen, Per; Kørnøv, Lone

    2017-08-15

    As an information carrier and communication medium, indicators provide useful decision-making assistance in setting process goals and effectively reaching the goals. The main focus of this article is to investigate indicators' role in influencing planning through Strategic Environmental Assessment (SEA) especially related to Chinese experiences. From the perspective of planning and decision-making theory, the influence on planning is studied as influence of planning structure and influence of planning actors. Such a conceptual framework is applied in order to demonstrate how the use of indicators can influence planning through a SEA process. The study holds two empirical levels. On a general level, based on an online survey, this article investigates SEA practitioners' experiences in using indicators. On a case level, two urban plans are selected to provide more detailed experiences. The case level investigation is based on a documentary study and individual interviews with SEA practitioners/planners. By exploring how indicators influence planning through the structure of and the actors within SEA, this study tries to provide an overview of indicators' role in SEA. The results indicate that indicators are perceived as a useful tool in the Chinese SEA system. By improving and simplifying the procedures of SEA, the indicators exert more structural influence on SEA and on plan making. On the other hand, indicators are also shown to have more influence through political actors than found among technical actors. Copyright © 2017. Published by Elsevier B.V.

  16. Wind power planning: assessing long-term costs and benefits

    International Nuclear Information System (INIS)

    Kennedy, Scott

    2005-01-01

    In the following paper, a new and straightforward technique for estimating the social benefit of large-scale wind power production is presented. The social benefit is based upon wind power's energy and capacity services and the avoidance of environmental damages. The approach uses probabilistic load duration curves to account for the stochastic interaction between wind power availability, electricity demand, and conventional generator dispatch. The model is applied to potential offshore wind power development to the south of Long Island, NY. If natural gas combined cycle and integrated gasifier combined cycle (IGCC) are the alternative generation sources, wind power exhibits a negative social benefit due to its high capacity cost and the relatively low emissions of these advanced fossil-fuel technologies. Environmental benefits increase significantly if charges for CO 2 emissions are included. Results also reveal a diminishing social benefit as wind power penetration increases. The dependence of wind power benefits on CO 2 charges, and capital costs for wind turbines and IGCC plant is also discussed. The methodology is intended for use by energy planners in assessing the social benefit of future investments in wind power

  17. Savannah River Site management response plan for chemical safety vulnerability field assessment. Revision 1

    International Nuclear Information System (INIS)

    Kahal, E.J.; Murphy, S.L.; Salaymeh, S.R.

    1994-09-01

    As part of the U.S. Department of Energy's (DOE) initiative to identify potential chemical safety vulnerabilities in the DOE complex, the Chemical Safety Vulnerability Core Working Group issued a field verification assessment report. While the report concluded that Savannah River Site (SRS) is moving in a positive direction, the report also identified five chemical safety vulnerabilities with broad programmatic impact that are not easily nor quickly remedied. The May 1994 SRS Management Response Plan addressed the five SRS vulnerabilities identified in the field assessment report. The SRS response plan listed observations supporting the vulnerabilities and any actions taken or planned toward resolution. Many of the observations were resolved by simple explanations, such as the existence of implementation plans for Safety Analysis Report updates. Recognizing that correcting individual observations does not suffice in remedying the vulnerabilities, a task team was assembled to address the broader programmatic issues and to recommend corrective actions

  18. An assessment of implementation and evaluation phases of strategic plans in Iranian hospitals.

    Science.gov (United States)

    Sadeghifar, Jamil; Tofighi, Shahram; Roshani, Mohamad; Toulideh, Zahra; Mohsenpour, Seyedramezan; Jafari, Mehdi

    2017-01-01

    To assess the implementation and evaluation phases of strategic plans in selected hospitals. We conducted a cross-sectional study of implementation and evaluation of strategic plan in 24 hospitals in 2015, using a questionnaire which consisted of two separate sections for strategic implementation and strategic evaluation. Data were analyzed with SPSS version 18. Nearly one-third of hospitals claimed that they allocate their budget based on priorities and strategic goals. However, it turned out that although goals had been set, no formal announcements had been made. Most of the hospitals stated that they used measures when evaluating the plan. For hospital staff, clarifying the hospital's priorities was the most important advantage of a strategic plan. There is no clear definition for strategic management in Iranian hospitals, which results in chaotic implementation and control of strategic planning.

  19. Review of quality assessment tools for family planning programmes in low- and middle-income countries.

    Science.gov (United States)

    Sprockett, Andrea

    2017-03-01

    Measuring and tracking the quality of healthcare is a critical part of improving service delivery, clinic efficiency and health outcomes. However, no standardized or widely accepted tool exists to assess the quality of clinic-based family planning services in low- and middle-income countries. The objective of this literature review was to identify widely used public domain quality assessment tools with existing or potential application in clinic-based family planning programmes. Using PubMed, PopLine, Google Scholar and Google, key terms such as ‘quality assessment tool’, ‘quality assessment method’, ‘quality measurement’, ‘LMIC’, ‘developing country’, ‘family planning’ and ‘reproductive health’ were searched for articles, identifying 20 relevant tools. Tools were assessed to determine the type of quality components assessed, divided into structure and process components, level of application (national or facility), health service domain that can be assessed by the tool, cost and current use of the tool. Tools were also assessed for shortcomings based on application in a low- and middle-income clinic-based family planning programme, including personnel required, re-assessment frequency, assessment of structure, process and outcome quality, comparability of data over time and across facilities and ability to benchmark clinic results to a national benchmark. No tools met all criteria, indicating a critical gap in quality assessment for low- and middle-income family planning programmes. To achieve Universal Health Coverage, agreed on in the Sustainable Development Goals and to improve system-wide healthcare quality, we must develop and widely adopt a standardized quality assessment tool.

  20. Treatment planning capability assessment of a beam shaping assembly for accelerator-based BNCT.

    Science.gov (United States)

    Herrera, M S; González, S J; Burlon, A A; Minsky, D M; Kreiner, A J

    2011-12-01

    Within the frame of an ongoing project to develop a folded Tandem-Electrostatic-Quadrupole accelerator facility for Accelerator-Based Boron Neutron Capture Therapy (AB-BNCT) a theoretical study was performed to assess the treatment planning capability of different configurations of an optimized beam shaping assembly for such a facility. In particular this study aims at evaluating treatment plans for a clinical case of Glioblastoma. Copyright © 2011 Elsevier Ltd. All rights reserved.

  1. Environmental Assessment for the General Plan and Maintenance of Patrick Air Force Base, Florida

    Science.gov (United States)

    2005-05-01

    considered viable. P A F B G e n e r a l P l a n E A 2 Environmental Effects The General Plan EA evaluated the environmental impacts of...year cycle. The potential environmental effects were assessed for the following environmental resource areas: air quality, water quality, geology...ADP Area Development Plan AF Air Force AFB Air Force Base AFETR Air Force Eastern Test Range AFI Air Force Instruction AFMAN Air Force Manual

  2. Treatment planning capability assessment of a beam shaping assembly for accelerator-based BNCT

    International Nuclear Information System (INIS)

    Herrera, M.S.; González, S.J.; Burlon, A.A.; Minsky, D.M.; Kreiner, A.J.

    2011-01-01

    Within the frame of an ongoing project to develop a folded Tandem-Electrostatic-Quadrupole accelerator facility for Accelerator-Based Boron Neutron Capture Therapy (AB-BNCT) a theoretical study was performed to assess the treatment planning capability of different configurations of an optimized beam shaping assembly for such a facility. In particular this study aims at evaluating treatment plans for a clinical case of Glioblastoma.

  3. 75 FR 44265 - Office of the Assistant Secretary for Planning and Evaluation; Request for Comments on the...

    Science.gov (United States)

    2010-07-28

    ... planning process is an opportunity for the Department to further refine and strengthen the strategic goal... for Planning and Evaluation; Request for Comments on the Departmental FY 2010-2015 Strategic Plan... and Human Services Draft FY 2010-2015 Strategic Plan is provided as part of the strategic planning...

  4. General practitioner workforce planning: assessment of four policy directions.

    LENUS (Irish Health Repository)

    Teljeur, Conor

    2010-01-01

    BACKGROUND: Estimating the supply of GPs into the future is important in forecasting shortages. The lengthy training process for medicine means that adjusting supply to meet demand in a timely fashion is problematic. This study uses Ireland as a case study to determine the future demand and supply of GPs and to assess the potential impact of several possible interventions to address future shortages. METHODS: Demand was estimated by applying GP visit rates by age and sex to national population projections. Supply was modelled using a range of parameters derived from two national surveys of GPs. A stochastic modelling approach was adopted to determine the probable future supply of GPs. Four policy interventions were tested: increasing vocational training places; recruiting GPs from abroad; incentivising later retirement; increasing nurse substitution to enable practice nurses to deliver more services. RESULTS: Relative to most other European countries, Ireland has few GPs per capita. Ireland has an ageing population and demand is estimated to increase by 19% by 2021. Without intervention, the supply of GPs will be 5.7% less than required in 2021. Increasing training places will enable supply to meet demand but only after 2019. Recruiting GPs from overseas will enable supply to meet demand continuously if the number recruited is approximately 0.8 per cent of the current workforce per annum. Later retirement has only a short-term impact. Nurse substitution can enable supply to meet demand but only if large numbers of practice nurses are recruited and allowed to deliver a wide range of GP services. CONCLUSIONS: A significant shortfall in GP supply is predicted for Ireland unless recruitment is increased. The shortfall will have numerous knock-on effects including price increases, longer waiting lists and an increased burden on hospitals. Increasing training places will not provide an adequate response to future shortages. Foreign recruitment has ethical considerations

  5. Intelligent Aircraft Damage Assessment, Trajectory Planning, and Decision-Making under Uncertainty

    Science.gov (United States)

    Lopez, Israel; Sarigul-Klijn, Nesrin

    Situational awareness and learning are necessary to identify and select the optimal set of mutually non-exclusive hypothesis in order to maximize mission performance and adapt system behavior accordingly. This paper presents a hierarchical and decentralized approach for integrated damage assessment and trajectory planning in aircraft with uncertain navigational decision-making. Aircraft navigation can be safely accomplished by properly addressing the following: decision-making, obstacle perception, aircraft state estimation, and aircraft control. When in-flight failures or damage occur, rapid and precise decision-making under imprecise information is required in order to regain and maintain control of the aircraft. To achieve planned aircraft trajectory and complete safe landing, the uncertainties in system dynamics of the damaged aircraft need to be learned and incorporated at the level of motion planning. The damaged aircraft is simulated via a simplified kinematic model. The different sources and perspectives of uncertainties in the damage assessment process and post-failure trajectory planning are presented and classified. The decision-making process for an emergency motion planning and landing is developed via the Dempster-Shafer evidence theory. The objective of the trajectory planning is to arrive at a target position while maximizing the safety of the aircraft given uncertain conditions. Simulations are presented for an emergency motion planning and landing that takes into account aircraft dynamics, path complexity, distance to landing site, runway characteristics, and subjective human decision.

  6. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents a complete response to the Tiger Team assessment that was conducted to Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 2, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root cause of the findings identified during the assessment. This report is concerned with reactors safety and health findings, responses, and planned actions. Specific areas include: organization and administration; quality verification; operations; maintenance; training and certification; auxiliary systems; emergency preparedness; technical support; nuclear criticality safety; security/safety interface; experimental activities; site/facility safety review; radiological protection; personnel protection; fire protection; management findings, responses, and planned actions; self-assessment findings, responses, and planned actions; and summary of planned actions, schedules, and costs

  7. Engineering Task Plan for the Integrity Assessment Examination of Double-Contained Receiver Tanks (DCRT), Catch Tanks and Ancillary facilities

    International Nuclear Information System (INIS)

    BECKER, D.L.

    2000-01-01

    This Engineering Task Plan (ETP) presents the integrity assessment examination of three DCRTs, seven catch tanks, and two ancillary facilities located in the 200 East and West Areas of the Hanford Site. The integrity assessment examinations, as described in this ETP, will provide the necessary information to enable the independently qualified registered professional engineer (IQRPE) to assess the condition and integrity of these facilities. The plan is consistent with the Double-Shell Tank Waste Transfer Facilities Integrity Assessment Plan

  8. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems

  9. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  10. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    Science.gov (United States)

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  11. Strategic Environmental Assessment as catalyst of healthier spatial planning: The Danish guidance and practice

    International Nuclear Information System (INIS)

    Kornov, Lone

    2009-01-01

    A wide range of factors within spatial planning can affect health. There is therefore an important scope for Strategic Environmental Assessment (SEA) of spatial plans to protect and improve human health. Due to the EU Directive 2001/42/EC on SEA, health has been made explicit in Danish legislation and guidance. This paper examines the inclusion of health as a formal component in impact assessment of spatial plans. Based upon a documentary study of 100 environmental reports, the paper analyses and discusses how health impact considerations are incorporated in SEA practice. It is found that health impacts are included in SEA practice and are being interpreted in a broader sense than what the national guidance exemplifies. The frequent included health aspects are noise, drinking water, air pollution, recreation/outdoor life and traffic safety. The primary determinant for health is transport-whether it is at the overall or local planning level. The main conclusion is that SEA shows a potential to catalyse healthier spatial planning. Despite the broad inclusion of health in SEA practice the examination shows potential improvements, hereunder qualification of assessments by better explaining the nature and significance of impacts and by including the distributional aspects of human health impacts. Inclusion from the health sector is put forward as an important institutional mean to secure cross disciplinarily and higher quality assessment

  12. Strategic environmental assessment and national development plans in Turkey: Towards legal framework and operational procedure

    International Nuclear Information System (INIS)

    Say, Nuriye Peker; Yuecel, Muzaffer

    2006-01-01

    National development plans were started to be prepared in Turkey in 1963. These plans are mandatory for public investments and guiding principles for private investments. They have a quality which guides and sets objectives for other plans in the country. Therefore, they can be evaluated as the main reason of successes and failures of sectoral investments or the problems that they cause directly or indirectly. Turkey is undergoing rapid industrialization, urbanization and population growth, thus environmental problems are on the increase. Although Environmental Impact Assessment (EIA) has been applied to individual investments in Turkey since 1993, natural environment has continued to be affected because of human activities. Today, parallel to the developments in the world, it has been discussed that it is necessary to strengthen project-level Environmental Assessment (EA) and to practice Strategic Environmental Assessment (SEA). The interest in SEA, that is, EA at the level of proposed policies, plans and programs has grown significantly since 2000 in the country. Discussions and preparations have started about regulation which provides the legal and institutional framework for SEA in The Ministry of Environment and Forestry. However, since the scientific approach into the subject is very new in Turkey, it will take time to answer the questions about how and in what fields to practice. This research project aims at analyzing the possible practice opportunities of SEA in Turkey and the practicability of SEA into the National Five-Year Development Plan (FYDP) which is assumed at the highest level of planning hierarchy in the country. The research is conducted on two sections. In the first section, procedural approaches to SEA on national development plans are investigated and a framework for these approaches is adapted at the institutional level. In the second section, SEA form for energy sector in the development plans is developed. In this article, the findings

  13. Workshop on IAEA Tools for Nuclear Energy System Assessment for Long-Term Planning and Development

    International Nuclear Information System (INIS)

    2009-01-01

    The purpose of the workshop is to present to Member States tools and methods that are available from the IAEA in support of long-term energy planning and nuclear energy system assessments, both focusing on the sustainable development of nuclear energy. This includes tools devoted to energy system planning, indicators for sustainable energy development, the INPRO methodology for Nuclear Energy System Assessment (NESA) and tools for analysing nuclear fuel cycle material balance. The workshop also intends to obtain feedback from Member States on applying the tools, share experiences and lessons learned, and identify needs for IAEA support

  14. RCRA Assessment Plan for Single-Shell Tank Waste Management Area TX-TY

    Energy Technology Data Exchange (ETDEWEB)

    Horton, Duane G.

    2007-03-26

    WMA TX-TY contains underground, single-shell tanks that were used to store liquid waste that contained chemicals and radionuclides. Most of the liquid has been removed, and the remaining waste is regulated under the RCRA as modi¬fied in 40 CFR Part 265, Subpart F and Washington State’s Hazardous Waste Management Act . WMA TX-TY was placed in assessment monitoring in 1993 because of elevated specific conductance. A groundwater quality assessment plan was written in 1993 describing the monitoring activities to be used in deciding whether WMA TX-TY had affected groundwater. That plan was updated in 2001 for continued RCRA groundwater quality assessment as required by 40 CFR 265.93 (d)(7). This document further updates the assessment plan for WMA TX-TY by including (1) information obtained from ten new wells installed at the WMA after 1999 and (2) information from routine quarterly groundwater monitoring during the last five years. Also, this plan describes activities for continuing the groundwater assessment at WMA TX TY.

  15. Measurable improvement in patient safety culture: A departmental experience with incident learning.

    Science.gov (United States)

    Kusano, Aaron S; Nyflot, Matthew J; Zeng, Jing; Sponseller, Patricia A; Ermoian, Ralph; Jordan, Loucille; Carlson, Joshua; Novak, Avrey; Kane, Gabrielle; Ford, Eric C

    2015-01-01

    Rigorous use of departmental incident learning is integral to improving patient safety and quality of care. The goal of this study was to quantify the impact of a high-volume, departmental incident learning system on patient safety culture. A prospective, voluntary, electronic incident learning system was implemented in February 2012 with the intent of tracking near-miss/no-harm incidents. All incident reports were reviewed weekly by a multiprofessional team with regular department-wide feedback. Patient safety culture was measured at baseline with validated patient safety culture survey questions. A repeat survey was conducted after 1 and 2 years of departmental incident learning. Proportional changes were compared by χ(2) or Fisher exact test, where appropriate. Between 2012 and 2014, a total of 1897 error/near-miss incidents were reported, representing an average of 1 near-miss report per patient treated. Reports were filed by a cross section of staff, with the majority of incidents reported by therapists, dosimetrists, and physicists. Survey response rates at baseline and 1 and 2 years were 78%, 80%, and 80%, respectively. Statistically significant and sustained improvements were noted in several safety metrics, including belief that the department was openly discussing ways to improve safety, the sense that reports were being used for safety improvement, and the sense that changes were being evaluated for effectiveness. None of the surveyed dimensions of patient safety culture worsened. Fewer punitive concerns were noted, with statistically significant decreases in the worry of embarrassment in front of colleagues and fear of getting colleagues in trouble. A comprehensive incident learning system can identify many areas for improvement and is associated with significant and sustained improvements in patient safety culture. These data provide valuable guidance as incident learning systems become more widely used in radiation oncology. Copyright © 2015

  16. Debriefing to Improve Student Ability to Assess and Plan for the Care of Persons With Disability.

    Science.gov (United States)

    Takeda, Mikiko Y; Smith, Mark J; Cone, Catherine J

    2017-12-01

    Although recent literature suggests that students should be trained in the care of persons with disability (PWDs) as a form of cultural sensitivity (CS), healthcare professionals may receive limited experience during their formal training. After pharmacy students in 2 previous years of testing failed to adequately assess and plan for the care of a standardized patient's chief complaint and disability in an Objective Structured Clinical Examination (OSCE), the investigators added debriefing to the OSCE to determine if it would improve student's ability to assess and plan for the care of PWD. Two sequentially enrolled second-year pharmacy school student cohorts participated in this study (control n = 90; intervention n = 82). During the OSCE, students interviewed and examined a standardized patient with a simulated physical disability and other chronic disease states. Students were then instructed to develop a care plan considering the patient's disability and other disease states. The intervention cohort received debriefing; the control did not. Students documented the care plan in a subjective, objective, assessment, and plan (SOAP) note. Investigators assessed SOAP note score (general ability of students to write a SOAP note) and CS score (specific ability to care for PWD) to determine the effectiveness of the debriefing. The intervention group showed a significantly higher percent mean CS score than the control group (93.6% ± 19% and 61.1% ± 30.7%, respectively, P improvement in pass rates (those students scoring ≥70% on the OSCE) of 59.4% with 92.7% of the students passing in the intervention group versus 33.3% of the students passing in the control group (P improved students' performance in developing care plans for disabled patients. Ideally, longitudinal studies should be completed to determine if these skills transfer from debriefings to clinical practice. Development of effective training and assessment methods is essential for students to obtain

  17. Advantages of integrated and sustainability based assessment for metabolism based strategic planning of urban water systems.

    Science.gov (United States)

    Behzadian, Kourosh; Kapelan, Zoran

    2015-09-15

    Despite providing water-related services as the primary purpose of urban water system (UWS), all relevant activities require capital investments and operational expenditures, consume resources (e.g. materials and chemicals), and may increase negative environmental impacts (e.g. contaminant discharge, emissions to water and air). Performance assessment of such a metabolic system may require developing a holistic approach which encompasses various system elements and criteria. This paper analyses the impact of integration of UWS components on the metabolism based performance assessment for future planning using a number of intervention strategies. It also explores the importance of sustainability based criteria in the assessment of long-term planning. Two assessment approaches analysed here are: (1) planning for only water supply system (WSS) as a part of the UWS and (2) planning for an integrated UWS including potable water, stormwater, wastewater and water recycling. WaterMet(2) model is used to simulate metabolic type processes in the UWS and calculate quantitative performance indicators. The analysis is demonstrated on the problem of strategic level planning of a real-world UWS to where optional intervention strategies are applied. The resulting performance is assessed using the multiple criteria of both conventional and sustainability type; and optional intervention strategies are then ranked using the Compromise Programming method. The results obtained show that the high ranked intervention strategies in the integrated UWS are those supporting both water supply and stormwater/wastewater subsystems (e.g. rainwater harvesting and greywater recycling schemes) whilst these strategies are ranked low in the WSS and those targeting improvement of water supply components only (e.g. rehabilitation of clean water pipes and addition of new water resources) are preferred instead. Results also demonstrate that both conventional and sustainability type performance indicators

  18. Assessing the Sustainability Performance of Urban Plans based on Ecosystem Services

    Science.gov (United States)

    Menteşe, E. Y.; Tezer, A.

    2017-12-01

    Aiming at efficient and mindful use of natural resources while enabling social cohesion and economic development; sustainable development is one of the most emerging phenomenon in last decade. In this regard, role of urban development is critical by means of achieving sustainability since more than half of the world's population lives in cities. However, there is no solid and widely accepted approach for sustainability assessment in land use planning because there is not enough evidence on the relation between land use plans and environmental sustainability. With the basic aim of setting up relation between environmental sustainability and urban plans, this study utilizes ecosystem services phenomenon to define sustainability performance of a land use plan. Since ecosystem services can easily be related with land cover and land use they can be used as an efficient tool to act as indicators of sustainability. Meanwhile, while urban plans can provide ecosystem services and their level of service provision can be quantified, this is not solely enough for understanding its sustainability. Because it is also known that a land use plan mostly has negative impact on sustainability. Hence, this study embraces land use plans as a source of ecosystem services and environmental impacts. The difference between these entities are assumed to be the sustainability performance of a plan. The analysis relies on four parameters: ecosystem service capacity (environmental impact capacity), areal quantity of a land cover / use function, fragmantation level of the land use / cover and weight of ecosystem services / environmental impacts. Lastly, this approach is adopted for Istanbul's environmental master plan of 2009 and actual land cover of the same period. By calculating both data's environmental performance, the change of sustainability level sourced from environmental plan is analyzed.

  19. Ecological risk assessment guidance for preparation of remedial investigation/feasibility study work plans

    International Nuclear Information System (INIS)

    Pentecost, E.D.; Vinikour, W.S.

    1993-08-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial assessment investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfired Amendments and Reauthorization Act of 1986 (SARA), an RI/FS work plan win have to be developed as part of the site-remediation scoping the process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites. An overview analysis of early ecological risk assessment methods (i.e., in the 1980s) at Superfund sites was conducted by the EPA (1989a). That review provided a perspective of attention given to ecological issues in some of the first RI/FS studies. By itself, that reference is of somewhat limited value; it does, however, establish a basis for comparison of past practices in ecological risk with current, more refined methods

  20. Tooth wear risk assessment and care-planning in general dental practice.

    Science.gov (United States)

    O'Toole, S; Khan, M; Patel, A; Patel, N J; Shah, N; Bartlett, D; Movahedi, S

    2018-03-09

    Objective To assess charting, risk assessment and treatment-planning of tooth wear between recently qualified and experienced dentists in general dental practice.Design Service evaluation.Setting Multi-setting evaluation of three mixed NHS/Private general dental practices in North-East London.Methods The clinical notes of new patient examinations on dentate adults presenting from the 1 October 2016 to 31 December 2016 were audited collecting data on tooth wear charting, risk assessment and treatment planning. Data were analysed using descriptives, chi square and logistic regressions in SPSS. Significance was inferred at p charted for 48% of those attending foundation dentists and 5% of those attending experienced dentists. Diet was assessed in 50.6% of patients examined by foundation dentists and 1.0% of patients examined by experienced dentists. Foundation dentists were more likely to chart tooth wear, risk assess and preventively manage tooth wear compared to experienced dentists (p <0.001).Conclusion This service evaluation highlights that improvements are required in recording, risk assessing and preventive treatment planning of erosive tooth wear. Experienced dentists were less likely to risk assess tooth wear and less likely to provide preventive treatment. Experienced GDPs may benefit from re-training in this area.

  1. Financial Management: U.S. Army Corps of Engineers Financial Information Imported Into the Defense Departmental Reporting System - Audited Financial Statements

    National Research Council Canada - National Science Library

    Granetto, Paul J; Peek, Marvin L; Armstrong, Jack L; Wenzel, Paul C; Furey, Kathleen A; Zimmerman, Craig W

    2004-01-01

    ... are: the Corps of Engineers Financial Management System, the Corps of Engineers Enterprise Management Information System, and the Defense Departmental Reporting System - Audited Financial Statements...

  2. Strategic environmental assessment for local transport plans; Strategische Umweltpruefung in der kommunalen Verkehrsentwicklung

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, Vera

    2008-08-15

    The strategic environmental assessment (SEA) makes new demands for plans and programs also in the transport sector. Particularly on local level transport is one of the biggest causers of negative environmental effects. But there exists no SEA obligation for local transport plans, however many factors suggest to make such an examination in this sector. At the latest in the urban land use planning transport effects are a component for the SEA. Synergies can be exhausted and the individual planning steps are appropriately co-ordinated by the meaningful integration of transport and urban development planning. Additional synergies can gained in connection with further local and/or regional planning like e.g. the clean air planning or noise reduction planning. The aim of the doctoral thesis is to draft recommendations how to integrate the SEA into local transport planning process. For that purpose it is necessary to deduce the requirements demanded by the SEA and to demonstrate the current state of the local transport planning. The doctoral thesis is based on partial results of the research project FE 73.0237 ''Strategische Umweltpruefung in der kommunalen Verkehrsentwicklungsplanung'' in behalf of the German Ministry of Transport (Bundesministerium fuer Verkehr, Bauen und Stadtentwicklung) and mentored by the Federal Office of civil engineering (Bundesamt fuer Bauwesen und Raumordnung). The author of this thesis was instrumental in acquiring those results. The thesis contains a detailed literature research. The SEA's requirements are also described as well as the current state of the local transport planning. The state of the SEA on the different planning levels in the German transport sector is presented. Another part is a survey of 13 municipalities concerning their previous practice of the local transport and environmental planning as well as their experience with the SEA on local level and the analyse of local data. Furthermore three

  3. An Assessment for Emergency Preparedness Plan in Hanul Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Park, Sunghyun; Jae, Moosung [Hanyang University, Seoul (Korea, Republic of)

    2016-10-15

    The purpose of emergency preparedness aims to protect the accident and mitigate the radiation damage of public by setting emergency preparedness plan. In order to perform successfully the emergency preparedness plan, it should be optimized through a quantitative analysis. There are so many variables to analyze it quantitatively. It is mission to classify a realistic and suitable variables among these variables. The realistic variables is converted to the decision node in decision tree which is helpful to decide what evacuation or sheltering is effective to mitigate public damage. Base on it, it's idealistic method to analyze offsite consequences for each end points in the decision tree. In this study, we selected the reference plant which already has the emergency preparedness plan. Among the plan, we implemented offsite consequence analysis for a specific plan by using MACCS 2 code. In this study, target group is people who gathered in place 1 have sheltered and evacuated along the pathway. the offsite consequences analysis result of the group are 1.17·10-9 (early fatality), 1.77·10-7 (late fatality). Various cases need to be quantified for make an optimized decision. In the future, we will perform the verification and modification of decision node. After The assessment of emergency preparedness plan for Hanul nuclear power plant unit 5, 6 might be contribute to establish the optimized decision making of emergency prepared plan.

  4. Performance Improvement in 503A Compounding Pharmacies: A PLAN FOR ASSESSMENT, IMPLEMENTATION, AND SUSTAINED SUCCESS.

    Science.gov (United States)

    Pritchett, Jon; Mixon, William; O'Connell, Kevin

    2016-01-01

    Performance improvement is the continual effort to objectively assess current performance and then restructure the practices that support it to more closely achieve desired performance. A plan for performance improvement, unlike other approaches to correcting problems in job fulfillment, is a systematic method used to first find the root causes of areas of concern and then apply corrections to remedy those deficits. Implementing a performance improvement plan that can be easily adapted to ensure compliance with evolving and increasingly complex state and federal regulations is crucial to a successful compounding practice. In this article, we discuss the need for performance improvement in 503A compounding pharmacies, list the steps necessary to develop such a plan, and present three case reports of performance improvement plans in differing compounding settings.

  5. A Computer-Aided Bibliometrics System for Journal Citation Analysis and Departmental Core Journal Ranking List Generation

    Directory of Open Access Journals (Sweden)

    Yih-Chearng Shiue

    2004-12-01

    Full Text Available Due to the tremendous increase and variation in serial publications, faculties in department of university are finding it difficult to generate and update their departmental core journal list regularly and accurately, and libraries are finding it difficult to maintain their current serial collection for different departments. Therefore, the evaluation of a departmental core journal list is an important task for departmental faculties and librarians. A departmental core journal list not only helps departments understand research performances of faculties and students, but also helps librarians make decisions about which journals to retain and which to cancel. In this study, a Computer-Aided Bibliometrics System was implemented and two methodologies (JCDF and LibJF were proposed in order to generate a departmental core journal ranking list and make the journal citation analysis. Six departments were taken as examples, with MIS as the major one. One journal citation pattern was found and the ratio of Turning point-to-No. journal was always around 0.07 among the 10 journals and 6 departments. After comparing with four methodologies via overlapping rate and standard deviation distances, the two proposed methodologies were shown to be better than questionnaire and library subscription method.

  6. Strategic environmental assessment implementation of transport and mobility plans. The case of Italian regions and provinces

    Directory of Open Access Journals (Sweden)

    Andrea De Montis

    2016-06-01

    Full Text Available Transport and mobility plans imply strategies and actions that affect the environment. The European Union has introduced in 2001 the strategic environmental assessment (SEA to take into account and mitigate adverse environmental effects in planning and decision-making. SEA limited implementation has attracted the interest of many scholars that have sought methods able to assess the quality of SEA processes by identifying vices and virtues in practice. In this paper, we measure the quality of eight SEAs for transport and mobility plans of regional and provincial administrations of Italy. Results show that the overall quality level of SEA reports is only barely sufficient, Abruzzo is among the virtuous and Piedmont among the critical administrations. We also stress that the determination of impact significance has received the worse quality score. We finally compare our results to other Italian and British homologous cases finding interesting and generally confirmative evidences.

  7. Remedial action and waste disposal project -- 300-FF-1 remedial action readiness assessment plan

    International Nuclear Information System (INIS)

    April, J.G.; Carlson, R.A.; Greif, A.A.; Johnson, C.R.; Orewiler, R.I.; Perry, D.M.; Plastino, J.C.; Roeck, F.V.; Tuttle, B.G.

    1997-04-01

    This Readiness Assessment Plan presents the methodology used to assess the readiness of the 300-FF-1 Remedial Action Project. Remediation involves the excavation, treatment if applicable, and final disposal of contaminated soil and debris associated with the waste sites in the 300-FF-1 Operable Unit. The scope of the 300-FF-1 remediation is to excavate, transport, and dispose of contaminated solid from sites identified in the 300-FF-1 Operable Unit

  8. Integrating fire behavior models and geospatial analysis for wildland fire risk assessment and fuel management planning

    Science.gov (United States)

    Alan A. Ager; Nicole M. Vaillant; Mark A. Finney

    2011-01-01

    Wildland fire risk assessment and fuel management planning on federal lands in the US are complex problems that require state-of-the-art fire behavior modeling and intensive geospatial analyses. Fuel management is a particularly complicated process where the benefits and potential impacts of fuel treatments must be demonstrated in the context of land management goals...

  9. Functional Behavioral Assessments and Behavior Support Plans for Work-Based Learning

    Science.gov (United States)

    Kittelman, Angus; Wagner Bromley, Katherine; Mazzotti, Valerie L.

    2016-01-01

    Work experiences are linked to positive post-school outcomes for youth and young adults with disabilities. Unfortunately, students who struggle to manage conflict and challenges in work settings have a difficult time maintaining employment. Though ecological assessments are used to create supported work plans surrounding socially inappropriate…

  10. Predicting Teachers' Intentions to Implement School-Based Assessment Using the Theory of Planned Behaviour

    Science.gov (United States)

    Yan, Zi

    2014-01-01

    The theory of planned behaviour (TPB) was used to explore the Hong Kong teachers' intentions to implement school-based assessment (SBA) and the predictors of those intentions. A total of 280 teachers from Hong Kong secondary schools who had been involved in SBA were surveyed. Rasch-calibrated teacher measures were calculated for each of the 6…

  11. An interactive water indicator assessment tool to support land use planning

    NARCIS (Netherlands)

    Hellegers, P.J.G.J.; Jansen, H.C.; Bastiaanssen, W.G.M.

    2012-01-01

    This paper presents an interactive web-based rapid assessment tool that generates key water related indicators to support decision making by stakeholders in land use planning. The tool is built on a consistent science based method that combines remote sensing with hydrological and socioeconomic

  12. 75 FR 22737 - Final Damage Assessment and Restoration Plan for the Bayou Verdine and Calcasieu River

    Science.gov (United States)

    2010-04-30

    ..., and Liability Act (CERCLA), 42 U.S.C. 9607(f), Section 311 of the Federal Water Pollution and Control... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Final Damage Assessment and Restoration Plan for the Bayou Verdine and Calcasieu River AGENCY: National Oceanic and Atmospheric...

  13. Strategic Environmental Assessment as catalyst of healthier spatial planning: The Danish guidance and practice

    DEFF Research Database (Denmark)

    Kørnøv, Lone

    2009-01-01

    and guidance. This paper examines the inclusion of health as a formal component in impact assessment of spatial plans. Based upon a documentary study of 100 environmental reports, the paper analyses and discusses how health impact considerations are incorporated in SEA practice. It is found that health impacts...

  14. Planning for Student Assessment: Participant's Handbook. Bilingual Evaluation Technical Assistance, Workshop III.

    Science.gov (United States)

    California Univ., Los Angeles. Center for the Study of Evaluation.

    This participant's handbook is designed to be used in conjunction with a workshop for planning bilingual student assessment. The following materials are included: (1) simulation materials, including descriptions of simulated programs, tests, test manuals, and printouts; (2) checklists, diagrams, and charts illustrating important points of the…

  15. Career Development Strivings: Assessing Goals and Motivation in Career Decision-Making and Planning

    Science.gov (United States)

    Dik, Bryan J.; Sargent, Adam M.; Steger, Michael F.

    2008-01-01

    This article describes and demonstrates a novel approach to assessing goals and motives among individuals engaged in the career decision-making and planning process. Participants generated five career development strivings, rated each striving along several dimensions (self-efficacy, outcome expectations, sense of calling, spiritual significance,…

  16. Functional Behavior Assessments and Behavior Intervention Plans: Legal Requirements and Professional Recommendations

    Science.gov (United States)

    Collins, Lauren W.; Zirkel, Perry A.

    2017-01-01

    Functional behavior assessments (FBAs) and behavior intervention plans (BIPs) are critical components in the education of students with, or at risk for, emotional disturbance (ED). The purpose of this article is to compare the legal requirements with the professional requirements for FBAs and BIPs. The comparison is first according to the…

  17. River Protection Project waste feed delivery program technical performance measurement assessment plan

    International Nuclear Information System (INIS)

    O'TOOLE, S.M.

    1999-01-01

    This plan establishes a formal technical performance-monitoring program. Technical performance is assessed by establishing requirements based performance goals at the beginning of a program and routinely evaluating progress in meeting these goals at predetermined milestones throughout the project life cycle

  18. The Inquiry Matrix: A Tool for Assessing and Planning Inquiry in Biology and Beyond

    Science.gov (United States)

    Grady, Julie

    2010-01-01

    One way to advance inquiry in the classroom is to establish a systematic strategy for reflecting on our practice and our students' readiness to engage in increasingly complex scientific reasoning. The Matrix for Assessing and Planning Scientific Inquiry (MAPSI) is a tool that promotes this valuable reflection so that we, as teachers, are better…

  19. Clinical Reasoning in the Assessment and Intervention Planning for Attention-Deficit/Hyperactivity Disorder

    Science.gov (United States)

    Climie, Emma A.; Mah, Janet W. T.; Chase, Cheryl Y.

    2017-01-01

    The purpose of this article is to provide the reader with insight into the clinical reasoning involved in the assessment and intervention planning for a child with Attention-Deficit/Hyperactivity Disorder. The reader will be guided through the authors' conceptualization of this case, and suggestions for intervention in the classroom will be…

  20. 46200 Planning and Development of Wind Farms: Wind resource assessment using the WAsP software

    DEFF Research Database (Denmark)

    Mortensen, Niels Gylling

    These course notes are intended for the three-week course 46200 Planning and Development of Wind Farms given each year at the Technical University of Denmark. The purpose of the course notes is to give an introduction to wind resource assessment and siting issues using the WAsP suite of programs....

  1. Planning and Development of Wind Farms: Wind Resource Assessment and Siting

    DEFF Research Database (Denmark)

    Mortensen, Niels Gylling

    These course notes are intended for the three-week course 45700 Planning and Development of Wind Farms given at the Technical University of Denmark. The purpose of the course notes is to give an introduction to wind resource assessment and siting issues using the WAsP suite of programs....

  2. Planning and Development of Wind Farms: Wind Resource Assessment and Siting

    DEFF Research Database (Denmark)

    Mortensen, Niels Gylling

    These course notes are intended for the three-week course 46200 Planning and Development of Wind Farms given at the Technical University of Denmark. The purpose of the course notes is to give an introduction to wind resource assessment and siting issues using the WAsP suite of programs....

  3. ArcFuels: an ArcMap toolbar for fuel treatment planning and wildfire risk assessment

    Science.gov (United States)

    Nicole M. Vaillant; Alan A. Ager

    2014-01-01

    Fire behavior modeling and geospatial analysis can provide tremendous insight to land managers in defining both the benefits and potential impacts of fuel treatments in the context of land management goals and public expectations. ArcFuels is a streamlined fuel management planning and wildfire risk assessment system that creates a trans-scale (stand to large landscape...

  4. 76 FR 17471 - Air Tour Management Plan Environmental Assessment for Mount Rainier National Park, WA; Public...

    Science.gov (United States)

    2011-03-29

    ... draft alternatives in the development of an Air Tour Management Plan (ATMP) for the Mount Rainier... Environmental Assessment (EA), an ATMP, and associated rulemaking actions which comply with the National...: http://parkplanning.nps.gov/MORA_ATMP or sent to the mailing addresses listed in the ``FOR FURTHER...

  5. Tank waste remediation system nuclear criticality safety inspection and assessment plan

    International Nuclear Information System (INIS)

    VAIL, T.S.

    1999-01-01

    This plan provides a management approved procedure for inspections and assessments of sufficient depth to validate that the Tank Waste Remediation System (TWRS) facility complies with the requirements of the Project Hanford criticality safety program, NHF-PRO-334, ''Criticality Safety General, Requirements''

  6. Using principles of justice to assess the modal equity of regional transportation plans

    NARCIS (Netherlands)

    Golub, A.; Martens, C.J.C.M.

    2014-01-01

    While equity has been an important consideration for transportation planning agencies in the U.S. following the passage of Civil Rights Act of 1964 (Title VI specifically) and the subsequent Department of Transportation directives, there is little guidance on how to assess the distribution of

  7. Assessment of Understanding: Student Teachers' Preparation, Implementation and Reflection of a Lesson Plan for Science

    Science.gov (United States)

    Juhler, Martin Vogt

    2017-05-01

    Research finds that student teachers often fail to make observable instructional goals, without which a secure bridge between instruction and assessment is precluded. This is one reason that recent reports state that teacher education needs to become better at helping student teachers to develop their thinking about and skills in assessing pupils' learning. Currently in Europe, the Lesson Study method and the Content Representation tool, which both have a specific focus on assessment, have started to address this problem. This article describes and discusses an intervention in which Lesson Study was used in combination with Content Representation in student teachers' field practice. Empirical materials from one group of student teachers were analyzed to illustrate how the student teachers worked with assessment during the planning of a lesson, how they implemented it in a research lesson, and how they used the gathered observations to make claims about assessment aims. The findings suggest that the student teachers placed greater emphasis on assessment through the intervention. However, it is also found that more attention should have been dedicated to the planning phase and that the group did not manage to keep a research focus throughout the Lesson Study process. This suggests that it properly would be beneficial with several planning sessions prior to the research lesson, as well as having an expert teacher leading the Lesson Study.

  8. Assessment for active living: harnessing the power of data-driven planning and action.

    Science.gov (United States)

    Bors, Philip A; Brownson, Ross C; Brennan, Laura K

    2012-11-01

    Robert Wood Johnson Foundation's Active Living by Design (ALbD) grant program funded 25 communities across the U.S. The ALbD National Program Office (NPO) supported grantee community partnerships with technical assistance for assessment, planning, and implementation activities intended to increase population levels of physical activity. This paper analyzes and summarizes the range of assessments conducted to identify local barriers and opportunities for active living as important elements of a thorough intervention planning process. Evaluation of the partnerships focused on documenting community changes and strategies used to produce those changes. With support from NPO staff and external evaluators, partnerships tracked and summarized their community assessment approaches as well as strengths and challenges in conducting assessments. The partnerships documented a range of assessment strategies and methods. Partnerships used several qualitative methods, including focus groups, individual and group interviews, and public meetings. Quantitative methods included surveys, audits, observations, and analysis of existing data, among others. The environmental audit was the most common assessment method used by the partnerships. Assessment processes and findings were used for not only intervention planning but also community engagement and direct advocacy. Assessment data collectors varied from professional staff to community volunteers. Assessments were essential to the identification of local barriers and assets related to active living, which in turn helped ALbD partnerships prioritize and refine their action strategies. Assessment processes were also valuable in building relationships with new partners, community members, and local officials. Copyright © 2012 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.

  9. Countywide Evaluation of the Long-Term Family Self-Sufficiency Plan. Assessing the Utility of the LTFSS Plan Service Delivery and Planning Framework

    National Research Council Canada - National Science Library

    Davis, Lois

    2002-01-01

    ...) is the lead agency responsible for implementing the evaluation of the LTFSS Plan. On December 5, 2000, the Board approved the implementation plan for the evaluation of the LTFSS Plan, LTFSS Project #46...

  10. 1996: BMBF expenditures for energy resrearch. Draft of the departmental federal budget 30

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Departmental budget 30 of the 1996 draft federal budget covers the activities of the German Federal Ministry for Education, Science, Research, and Technology (BMBF). The Ministry is the result of an amalgamation, in 1994, of the former Ministry for Education and Science (BMBW) and the former Ministry for Research and Technology (BMFT). For this reason, the total budget as indicated in the figures for 1995 and 1996 cannot be compared directly. The 1996 departmental budget No. 30 comprises a total of DM 15.62 (1995: 15.53) billion. Nuclear technology and nuclear research have desappeared almost completely as budgetary items and can be found only under the headings of Safety Research (DM 81/78 million) and Decommissioning (DM 259/232 million). A similar development was observed in recent years also with the change in names of German national research centers. However, this does not mean that the BMBF has completely withdrawn from nuclear research. These activities are now covered under more general items, such as 'Renewable Energies, Economical Use of Energy, Conversion and Combustion Technologies', for which expenditures of DM 290 (285) million have been earmarked in 1996. The BMBF makes available approx. DM 303 (290) million for investments into research centers, and approx. DM 1.32 (1.31) billion DM to cover their operating costs. The nuclear research share in these funds decreases steadily. DM 467 (472) million have been earmarked for basic research. (orig.) [de

  11. Commentary: Mentoring the mentor: executive coaching for clinical departmental executive officers.

    Science.gov (United States)

    Geist, Lois J; Cohen, Michael B

    2010-01-01

    Departmental executive officers (DEOs), department chairs, and department heads in medical schools are often hired on the basis of their accomplishments in research as well as their skills in administration, management, and leadership. These individuals are also expected to be expert in multiple areas, including negotiation, finance and budgeting, mentoring, and personnel management. At the same time, they are expected to maintain and perhaps even enhance their personal academic standing for the purposes of raising the level of departmental and institutional prestige and for recruiting the next generation of physicians and scientists. In the corporate world, employers understand the importance of training new leaders in requisite skill enhancement that will lead to success in their new positions. These individuals are often provided with extensive executive training to develop the necessary competencies to make them successful leaders. Among the tools employed for this purpose are the use of personal coaches or executive training courses. The authors propose that the use of executive coaching in academic medicine may be of benefit for new DEOs. Experience using an executive coach suggests that this was a valuable growth experience for new leaders in the institution.

  12. Self-guided training for deep brain stimulation planning using objective assessment.

    Science.gov (United States)

    Holden, Matthew S; Zhao, Yulong; Haegelen, Claire; Essert, Caroline; Fernandez-Vidal, Sara; Bardinet, Eric; Ungi, Tamas; Fichtinger, Gabor; Jannin, Pierre

    2018-04-04

    Deep brain stimulation (DBS) is an increasingly common treatment for neurodegenerative diseases. Neurosurgeons must have thorough procedural, anatomical, and functional knowledge to plan electrode trajectories and thus ensure treatment efficacy and patient safety. Developing this knowledge requires extensive training. We propose a training approach with objective assessment of neurosurgeon proficiency in DBS planning. To assess proficiency, we propose analyzing both the viability of the planned trajectory and the manner in which the operator arrived at the trajectory. To improve understanding, we suggest a self-guided training course for DBS planning using real-time feedback. To validate the proposed measures of proficiency and training course, two experts and six novices followed the training course, and we monitored their proficiency measures throughout. At baseline, experts planned higher quality trajectories and did so more efficiently. As novices progressed through the training course, their proficiency measures increased significantly, trending toward expert measures. We developed and validated measures which reliably discriminate proficiency levels. These measures are integrated into a training course, which quantitatively improves trainee performance. The proposed training course can be used to improve trainees' proficiency, and the quantitative measures allow trainees' progress to be monitored.

  13. Vulnerability Assessments and Resilience Planning at Federal Facilities. Preliminary Synthesis of Project

    Energy Technology Data Exchange (ETDEWEB)

    Moss, R. H. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.; Blohm, A. J. [Univ. of Maryland, College Park, MD (United States); Delgado, A. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.; Henriques, J. J. [James Madison Univ., Harrisonburg, VA (United States); Malone, E L. [Pacific Northwest National Lab. (PNNL)/Univ. of Maryland, College Park, MD (United States). Joint Global Change Research Inst.

    2015-08-15

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before final conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and infrastructure

  14. Assessment of hazards and risks for landscape protection planning in Sicily.

    Science.gov (United States)

    La Rosa, Daniele; Martinico, Francesco

    2013-09-01

    Landscape protection planning is a complex task that requires an integrated assessment and involves heterogeneous issues. These issues include not only the management of a considerable amount of data to describe landscape features but also the choice of appropriate tools to evaluate the hazards and risks. The landscape assessment phase can provide fundamental information for the definition of a Landscape Protection Plan, in which the selection of norms for protection or rehabilitation is strictly related to hazards, values and risks that are found. This paper describes a landscape assessment methodology conducted by using GIS, concerning landscape hazards, values and risk. Four hazard categories are introduced and assessed concerning urban sprawl and erosion: landscape transformations by new planned developments, intensification of urban sprawl patterns, loss of agriculture land and erosion. Landscape value is evaluated by using different thematic layers overlaid with GIS geoprocessing. The risk of loss of landscape value is evaluated, with reference to the potential occurrence of the previously assessed hazards. The case study is the Province of Enna (Sicily), where landscape protection is a relevant issue because of the importance of cultural and natural heritage. Results show that high value landscape features have a low risk of loss of landscape value. For this reason, landscape protection policies assume a relevant role in landscapes with low-medium values and they should be addressed to control the urban sprawl processes that are beginning in the area. Copyright © 2012 Elsevier Ltd. All rights reserved.

  15. A state-of-practice survey of policy, plan, and program assessment in Canadian provinces

    International Nuclear Information System (INIS)

    Noble, Bram F.

    2004-01-01

    Since the introduction of the 1999 Canadian Cabinet Directive on the environmental assessment of policies, plans, and programs (PPPs), higher-order environmental assessment has been receiving increased attention in Canada. However, while practices and systems are advancing at the federal level, there has been very little attention given to recent developments in PPP assessment at the provincial level. This paper presents the results of a Canada-wide survey of PPP assessment principles and practices in 10 Canadian provincial EA jurisdictions. The findings indicate that there exists considerable variability in the provisions for and practice of PPP assessment amongst Canadian provinces, with only Saskatchewan, Ontario, and Quebec identifying recent practice experience. Included amongst the main barriers to effective implementation at the provincial level are the lack of legislative requirements for strategic EA, and the limited understanding of the nature and benefits of higher-order impact assessment

  16. REHABILITATION NEEDS AND PLANS AMONG PATIENTS WITH CANCER, ASSESSED AT HOSPITALS AND WHEN REHABILITATION BEGINS

    DEFF Research Database (Denmark)

    Handberg, Charlotte; Maribo, Thomas; Jensen, Charlotte Maria

    and the specifics of needs and plans facilitates targeted rehabilitation interventions. Implications: Systematic needs assessment in cancer rehabilitation unveil the requirement of physical rehabilitation. Supervised physical activity renders an intervention possible tailored the special needs cancer patients have......Background: Systematic assessment of rehabilitation needs is prerequisite for sufficient rehabilitation, but little is known about patients' needs. Purpose: The aim of this study was to describe specific stated rehabilitation needs and plans among patients with cancer at hospitals when diagnosed...... and when municipal rehabilitation begins. Methods: Needs-assessment-forms for rehabilitation from 188 cancer patients from two hospitals and two municipal cancer rehabilitation programmes were analysed. The forms included 1) stated needs: 58 fixed areas categorised in six domains and 2) an area to document...

  17. Conservation physiology can inform threat assessment and recovery planning processes for threatened species

    DEFF Research Database (Denmark)

    Birnie-Gauvin, Kim; Walton, Sarah; Delle Palme, Caleigh A.

    2017-01-01

    threat assessments and work with partners to develop recovery plans. Here we argue that conservation physiology has much to offer for the threat assessment process and outline the ways in which this can be operationalized. For instance, conservation physiology is effective at revealing causal...... role in the conservation activities of bodies like the IUCN that are engaged in threat assessment and recovery of endangered organisms. Although we focus on activities at the international scale, these same concepts are relevant and applicable to national and regional bodies...

  18. Ecocity mapping using GIS: introducing a planning method for assessing and improving neighborhood vitality.

    Science.gov (United States)

    Smith, Richard; Miller, Kirstin

    2013-01-01

    Assessing neighborhood vitality is important to understanding how to improve quality of life and health outcomes. The ecocity model recognizes that cities are part of natural systems and favors walkable neighborhoods. This article introduces ecocity mapping, an innovative planning method, to the public health literature on community engagement by describing a pilot project with a new affordable housing development in Oakland, California between 2007 and 2009. Although ecocity mapping began as a paper technology, advances in geographic information systems (GIS) moved it forward. This article describes how Ecocity Builders used GIS to conduct ecocity mapping to (1) assess vitality of neighborhoods and urban centers to prioritize community health intervention pilot sites and (2) create scenario maps for use in community health planning. From fall 2007 to summer 2008, Ecocity Builders assessed neighborhood vitality using walking distance from parks, schools, rapid transit stops, grocery stores, and retail outlets. In 2008, ecocity maps were shared with residents to create a neighborhood health and sustainability plan. In 2009, Ecocity Builders developed scenario maps to show how changes to the built environment would improve air quality by reducing greenhouse gas emissions from vehicles, while increasing access to basic services and natural amenities. Community organizing with GIS was more useful than GIS alone for final site selection. GIS was useful in mapping scenarios after residents shared local neighborhood knowledge and ideas for change. Residents were interested in long-term environmental planning, provided they could meet immediate needs.

  19. National technology needs assessment for the preparation and implementation of climate change action plans

    Energy Technology Data Exchange (ETDEWEB)

    Berkel, C.W.M. van; Blonk, T.J.; Westra, C.A.

    1996-12-31

    In the United National Framework Convention on Climate Change (FCCC) it is recognised that developed countries have a responsibility in assisting developing countries and countries in economic transition in building a national capacity for the development, acquisition and transfer of Climate-related Technologies (CTs). Such assistance is most likely to be successful once it is tailored to the results of a sound assessment of the country`s development needs and once the results of this assessment have been endorsed by the most important stakeholders in the country. Recent insight in the opportunities and constraints for National (technology) Needs Assessments (NNAs) as planning tool for both capacity building and technology transfer regarding Environmentally Sound Technologies (ESTs) is applied here to propose a participatory Climate Change Action Planning (CCAP) process. This participatory planning process is thought to serve the dual objective of defining a national Climate Change Action Plan (CCAP) while at the same time contributing to the creation of a broad supportive basis for its acceptance and implementation among stakeholders in the developing country.

  20. Decommissioning planning and the assessment of alternatives for the Hanford production reactors

    International Nuclear Information System (INIS)

    Miller, C.E. Jr.; Potter, R.F.

    1985-01-01

    Several years ago, the US Department of Energy began assessing alternatives and planning the decommissioning of eight shut-down plutonium production reactors located on the DOE Hanford Site in Washington State. The first of these graphite-moderated, water-cooled, reactors was built and started up in 1944 as part of the World War II Manhattan Project. The last of them started up in 1955. The eight reactors each operated for 12 to 24 years, with all eight operating simultaneously for about 10 years. In the 1960's, production needs declined and the reactors were one-by-one permanently shut down, the last of them in 1971. (A ninth Hanford production reactor, N Reactor, was started up in 1963; it is still operating and is not within the scope of the decommissioning planning and alternatives assessment work reported in this paper). This paper provides an overview description of the decommissioning plan for the eight shut-down Hanford production reactors and their associated fuel storage basins. Included are descriptions of the decommissioning alternatives considered for the facilities, along with discussions of National Environmental Policy Act (NEPA) process activities applicable to the Hanford decommissioning work. The criteria used in assessing decommissioning alternatives and the assumptions used in the decommissioning planning are identified. 4 refs., 8 figs., 3 tabs

  1. 76 FR 70162 - Notice of Intent To Prepare an Environmental Assessment for a Possible Land Use Plan Amendment To...

    Science.gov (United States)

    2011-11-10

    ... whether the Sun Valley Management Framework Plan should be amended to address the sale. To the extent... sale. This notice initiates the public scoping process for the plan amendment and associated EA. The...] Notice of Intent To Prepare an Environmental Assessment for a Possible Land Use Plan Amendment To Provide...

  2. 76 FR 23755 - Release of Draft Risk and Exposure Assessments and Final Integrated Review Plan for the National...

    Science.gov (United States)

    2011-04-28

    ... titled, ``Ozone National Ambient Air Quality Standards: Scope and Methods Plan for Health Risk and... Standards: Scope and Methods Plan for Welfare Risk and Exposure Assessment'' (REA Plan for the secondary... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Parts 50 and 58 [EPA-HQ-OAR-2008-0699; FRL-9300-4] RIN 2060...

  3. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    International Nuclear Information System (INIS)

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE's preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public's role in helping DOE and the EPA to make the final decision on a remedy

  4. Applying an improved rapid impact assessment matrix method to strategic environmental assessment of urban planning in China

    Energy Technology Data Exchange (ETDEWEB)

    Li, Wei, E-mail: weili@bnu.edu.cn; Xie, Yuanbo, E-mail: former_007@163.com; Hao, Fanghua, E-mail: fanghua@bnu.edu.cn

    2014-04-01

    Strategic environmental assessment (SEA) has become an increasingly important decision-support tool for providing information on the environmental implications of a policy, plan, or program. The goal is to safeguard the environment and promote sustainable development at the strategic level. Despite major progress in implementing SEA practices internationally, developing countries, such as China, often lag behind in applying SEA methodology. Lack of available data and time constraints arising from tight schedules create problems. The rapid impact assessment matrix (RIAM) is a potential resource for breaking through such difficulties. Our analysis of RIAM applications suggested that it could become a tool for evaluating strategic alternatives because of its applicability in interdisciplinary settings, its transparency, and its short implementation timeframe. To make it more suitable for the SEA context, we have developed two major improvements to the conventional RIAM process: assignment of weights to assessment indicators and the development of an integrated environmental assessment score (IES). The improved RIAM process was employed in an SEA of the development plan for the Nansha District in Guangzhou, the capital city of Guangdong Province in China. It was used to assess five alternatives for development in Wanqingsha (WQS), a subunit of Nansha, where important ecological resources are located and where industrial development could impact the air quality in the neighboring Hong Kong Special Administrative Region (HKSAR). The evaluation identified WQS-A04 as the preferred alternative. This alternative involved a minimal amount of industrial development – 10% compared with the most intense development alternative – and included important wetland preservation plans. The assessment results have been incorporated into the officially approved development plan for Nansha. The improved RIAM methodology is well adapted to the technical aims of SEA and decision

  5. Applying an improved rapid impact assessment matrix method to strategic environmental assessment of urban planning in China

    International Nuclear Information System (INIS)

    Li, Wei; Xie, Yuanbo; Hao, Fanghua

    2014-01-01

    Strategic environmental assessment (SEA) has become an increasingly important decision-support tool for providing information on the environmental implications of a policy, plan, or program. The goal is to safeguard the environment and promote sustainable development at the strategic level. Despite major progress in implementing SEA practices internationally, developing countries, such as China, often lag behind in applying SEA methodology. Lack of available data and time constraints arising from tight schedules create problems. The rapid impact assessment matrix (RIAM) is a potential resource for breaking through such difficulties. Our analysis of RIAM applications suggested that it could become a tool for evaluating strategic alternatives because of its applicability in interdisciplinary settings, its transparency, and its short implementation timeframe. To make it more suitable for the SEA context, we have developed two major improvements to the conventional RIAM process: assignment of weights to assessment indicators and the development of an integrated environmental assessment score (IES). The improved RIAM process was employed in an SEA of the development plan for the Nansha District in Guangzhou, the capital city of Guangdong Province in China. It was used to assess five alternatives for development in Wanqingsha (WQS), a subunit of Nansha, where important ecological resources are located and where industrial development could impact the air quality in the neighboring Hong Kong Special Administrative Region (HKSAR). The evaluation identified WQS-A04 as the preferred alternative. This alternative involved a minimal amount of industrial development – 10% compared with the most intense development alternative – and included important wetland preservation plans. The assessment results have been incorporated into the officially approved development plan for Nansha. The improved RIAM methodology is well adapted to the technical aims of SEA and decision

  6. Assessing the health equity impacts of regional land-use plan making: An equity focussed health impact assessment of alternative patterns of development of the Whitsunday Hinterland and Mackay Regional Plan, Australia (Short report)

    International Nuclear Information System (INIS)

    Gunning, Colleen; Harris, Patrick; Mallett, John

    2011-01-01

    Health service and partners completed an equity focussed health impact assessment to influence the consideration of health and equity within regional land-use planning in Queensland, Australia. This project demonstrated how an equity oriented assessment matrix can assist in testing regional planning scenarios. It is hoped that this HIA will contribute to the emerging interest in ensuring that potential differential health impacts continue to be considered as part of land-use planning processes.

  7. A state-impact-state methodology for assessing environmental impact in land use planning

    International Nuclear Information System (INIS)

    Chen, Longgao; Yang, Xiaoyan; Chen, Longqian; Potter, Rebecca; Li, Yingkui

    2014-01-01

    The implementation of land use planning (LUP) has a large impact on environmental quality. There lacks a widely accepted and consolidated approach to assess the LUP environmental impact using Strategic Environmental Assessment (SEA). In this paper, we developed a state-impact-state (SIS) model employed in the LUP environmental impact assessment (LUPEA). With the usage of Matter-element (ME) and Extenics method, the methodology based on the SIS model was established and applied in the LUPEA of Zoucheng County, China. The results show that: (1) this methodology provides an intuitive and easy understanding logical model for both the theoretical analysis and application of LUPEA; (2) the spatial multi-temporal assessment from base year, near-future year to planning target year suggests the positive impact on the environmental quality in the whole County despite certain environmental degradation in some towns; (3) besides the spatial assessment, other achievements including the environmental elements influenced by land use and their weights, the identification of key indicators in LUPEA, and the appropriate environmental mitigation measures were obtained; and (4) this methodology can be used to achieve multi-temporal assessment of LUP environmental impact of County or Town level in other areas. - Highlights: • A State-Impact-State model for Land Use Planning Environmental Assessment (LUPEA). • Matter-element (ME) and Extenics methods were embedded in the LUPEA. • The model was applied to the LUPEA of Zoucheng County. • The assessment shows improving environment quality since 2000 in Zoucheng County. • The method provides a useful tool for the LUPEA in the county level

  8. A state-impact-state methodology for assessing environmental impact in land use planning

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Longgao [Institute of land resources, Jiangsu Normal University, Xuzhou 221116 (China); Yang, Xiaoyan [Institute of land resources, Jiangsu Normal University, Xuzhou 221116 (China); School of Environmental Science and Spatial Informatics, China University of Mining and Technology, Xuzhou 221116 (China); Chen, Longqian, E-mail: cumt_chenlongqian@163.com [School of Environmental Science and Spatial Informatics, China University of Mining and Technology, Xuzhou 221116 (China); Potter, Rebecca; Li, Yingkui [Department of Geography, University of Tennessee, Knoxville, TN 37996 (United States)

    2014-04-01

    The implementation of land use planning (LUP) has a large impact on environmental quality. There lacks a widely accepted and consolidated approach to assess the LUP environmental impact using Strategic Environmental Assessment (SEA). In this paper, we developed a state-impact-state (SIS) model employed in the LUP environmental impact assessment (LUPEA). With the usage of Matter-element (ME) and Extenics method, the methodology based on the SIS model was established and applied in the LUPEA of Zoucheng County, China. The results show that: (1) this methodology provides an intuitive and easy understanding logical model for both the theoretical analysis and application of LUPEA; (2) the spatial multi-temporal assessment from base year, near-future year to planning target year suggests the positive impact on the environmental quality in the whole County despite certain environmental degradation in some towns; (3) besides the spatial assessment, other achievements including the environmental elements influenced by land use and their weights, the identification of key indicators in LUPEA, and the appropriate environmental mitigation measures were obtained; and (4) this methodology can be used to achieve multi-temporal assessment of LUP environmental impact of County or Town level in other areas. - Highlights: • A State-Impact-State model for Land Use Planning Environmental Assessment (LUPEA). • Matter-element (ME) and Extenics methods were embedded in the LUPEA. • The model was applied to the LUPEA of Zoucheng County. • The assessment shows improving environment quality since 2000 in Zoucheng County. • The method provides a useful tool for the LUPEA in the county level.

  9. 78 FR 16656 - Draft Damage Assessment and Restoration Plan and Environmental Assessment for Natural Resource...

    Science.gov (United States)

    2013-03-18

    ... provide habitat for pink salmon, Dolly Verden, juvenile fish, and marine birds. The Trustees assessed... objectives. The proposed preferred alternative includes the following projects: (1) Remove two trash racks...

  10. DEVELOPMENT AND IMPROVEMENT OF BUSINESS HIGHER EDUCATION THROUGH IMPLEMENTATION OF STUDENTS LEARNING OUTCOMES ASSESSMENT PLAN (SLOAP

    Directory of Open Access Journals (Sweden)

    Zoran Ivanovski

    2013-03-01

    Full Text Available This study presents new vision how to upgrade business higher education at the Faculty of Economics at University of Tourism and Management in Skopje (UTMS. This paper is result of analyses of best practices of leading higher education institutions as well authors experience in higher education and business education and practice. The UTMS is orientated to introduce best practices and objective standards in order to offer high-quality business education for its students. UTMS has mission for permanent implementation of quality improvement measures as a way to achieve high professional and academic standards and become part of prosperous and respective Universities. In order to achieve this goal, UTMS plan to use additional measures, outcomes assessment as a way to measure institutional effectiveness, as well as effective technique for identifying where changes and improvements are necessary. UTMS has developed Students Learning Outcomes Assessment Plan (SLOAP as a way to reach this goal.Based on permanent analysis of students needs as well as business sector suggestions about desirable level of knowledge, skills and competence of the students from Faculty of Economics, gained from conducted evaluations, UTMS decide to make additional improvement and development of business education. This process have 4 phases: 1 evaluation of students attitude towards curricula and the instructors efficiency, 2preparation of the SLOAP (Student Learning Outcomes Assessment Plan document, 3 implementation of two direct measures from the SLOAP through assessment analysis and action planning, and 4 monitoring changes and improvements made as a result of action planning.The first phase was completed in spring semester 2012, as well as second one with development of Comprehensive Exam and Capstone Course as direct measures. Complete SLOAP also has indirect measures like student satisfaction inventory, course evaluations, alumni, and employers’ surveys, and a

  11. An annual employee education calendar as the capstone of educational assessment, planning, and delivery.

    Science.gov (United States)

    Morton, Paula G

    2005-01-01

    Staff development educators can better control their workload and provide a more comprehensive employee education program when the organization adopts a formal five-step process that culminates in the publication of an annual employee education calendar. This article describes the five steps of organization-wide learning needs assessment, resource allocation, priority setting, documentation of the educational plan, and calendar development, including elements and timelines. The annual calendar reflects involvement of staff throughout the facility in the identification, planning, and delivery of education programs. Its publication enhances staff and supervisors' awareness of learning opportunities. Its longer-range perspective assists managers and employees to better plan to meet learning needs and improves participation in staff development activities.

  12. Strategic environmental assessment in tourism planning - Extent of application and quality of documentation

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho Lemos, Clara, E-mail: clara@sc.usp.br [Environmental Engineering Science, Engineering School of Sao Carlos, University of Sao Paulo, Av. Trabalhador Saocarlense, 400, Caixa Postal 292, Sao Carlos, Sao Paulo, 13566-590 (Brazil); Fischer, Thomas B., E-mail: fischer@liverpool.ac.uk [Department of Civic Design, University of Liverpool, 74 Bedford Street South, Liverpool, L69 7ZQ (United Kingdom); Pereira Souza, Marcelo, E-mail: mps@usp.br [Environmental Engineering Science, Engineering School of Sao Carlos, University of Sao Paulo, Av. Trabalhador Saocarlense, 400, Caixa Postal 292, Sao Carlos, Sao Paulo, 13566-590 (Brazil)

    2012-07-15

    Strategic environmental assessment (SEA) has been applied throughout the world in different sectors and in various ways. This paper reports on results of a PhD research on SEA applied to tourism development planning, reflecting the situation in mid-2010. First, the extent of tourism specific SEA application world-wide is established. Then, based on a review of the quality of 10 selected SEA reports, good practice, as well as challenges, trends and opportunities for tourism specific SEA are identified. Shortcomings of SEA in tourism planning are established and implications for future research are outlined. - Highlights: Black-Right-Pointing-Pointer The extent of tourism specific SEA practice is identified. Black-Right-Pointing-Pointer Selected SEA/Tourism reports are evaluated. Black-Right-Pointing-Pointer SEA application to tourism planning is still limited. Black-Right-Pointing-Pointer A number of shortcomings can be pointed out.

  13. Strategic environmental assessment in tourism planning — Extent of application and quality of documentation

    International Nuclear Information System (INIS)

    Carvalho Lemos, Clara; Fischer, Thomas B.; Pereira Souza, Marcelo

    2012-01-01

    Strategic environmental assessment (SEA) has been applied throughout the world in different sectors and in various ways. This paper reports on results of a PhD research on SEA applied to tourism development planning, reflecting the situation in mid-2010. First, the extent of tourism specific SEA application world-wide is established. Then, based on a review of the quality of 10 selected SEA reports, good practice, as well as challenges, trends and opportunities for tourism specific SEA are identified. Shortcomings of SEA in tourism planning are established and implications for future research are outlined. - Highlights: ► The extent of tourism specific SEA practice is identified. ► Selected SEA/Tourism reports are evaluated. ► SEA application to tourism planning is still limited. ► A number of shortcomings can be pointed out.

  14. Participatory Multi-Criteria Assessment of Forest Planning Policies in Conflicting Situations: The Case of Tenerife

    Directory of Open Access Journals (Sweden)

    Montserrat Acosta

    2015-11-01

    Full Text Available Sustainable forest planning should involve the participation of stakeholder communities in the decision-making process. This participation can help avoid the possible rejection of new planning measures. In this paper, the decision-making process to implement regulations on the use of forest tracks on the island of Tenerife (Canary Islands, Spain is analyzed. In recent years, the number of people using the island’s forest environments has notably increased, leading to conflicts between different users of the tracks; as a result, the Island Council of Tenerife is working on regulating these pathways. This paper describes the framing analysis, design, and implementation of a participatory multi-criteria approach to explore, together with stakeholders, the best policy alternatives related to forest planning and management issues of forest track use. To do this, a set of tools has been developed, consisting of institutional analysis, participatory methods, and multi-criteria assessment techniques.

  15. US country studies program: Support for climate change studies, national plans, and technology assessments

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    This paper describes the objectives of the next phase of the U.S. Country Studies Program which was launched in support of the Framework Convention on Climate Change (FCCC). The next phases of this program aim to: assist countries in preparing Climate Change Action plans; support technology assessments and development of technology initiatives; enhance exchange of information and expertise in support of FCCC. The program offers support for these processes in the form of handbooks which have been published to aid in preparing action plans, and to provide information on methane, forestry, and energy technologies. In addition an array of training workshops have been and are scheduled to offer hands on instruction to participants, expert advice is available from trained personnel, and modeling tools are available to aid in development of action plans.

  16. An assessment of the number of CT slices necessary to plan breast radiotherapy

    International Nuclear Information System (INIS)

    Vincent, D.; Beckham, W.; Delaney, G.

    1999-01-01

    The aim of this study was to evaluate the number of CT slices required to produce satisfactory dose distribution for tangential field irradiation of the chest wall and breast and to assess correlation of this with the volume of breast tissue treated. We conclude that a single-slice plan is unsatisfactory in providing sufficient information about the dose variation across the treatment volume and that ideally a 3D plan with DVHs should be produced. If the required data is unavailable then a minimum of three slices should be used as an approximation. We also propose a software tool for treatment planning systems, which calculates the percentage of the total PTV having dose outside the ICRU 50 radiation dose distribution homogeneity guideline range

  17. An operational information systems architecture for assessing sustainable transportation planning: principles and design.

    Science.gov (United States)

    Borzacchiello, Maria Teresa; Torrieri, Vincenzo; Nijkamp, Peter

    2009-11-01

    This paper offers the description of an integrated information system framework for the assessment of transportation planning and management. After an introductory exposition, in the first part of the paper, a broad overview of international experiences regarding information systems on transportation is given, focusing in particular on the relationship between transportation system's performance monitoring and the decision-making process, and on the importance of this connection in the evaluation and planning process, in Italian and European cases. Next, the methodological design of an information system to support efficient and sustainable transportation planning and management aiming to integrate inputs from several different data sources is presented. The resulting framework deploys modular and integrated databases which include data stemming from different national or regional data banks and which integrate information belonging to different transportation fields. For this reason, it allows public administrations to account for many strategic elements that influence their decisions regarding transportation, both from a systemic and infrastructural point of view.

  18. Final Environmental Assessment Addressing Implementation of the Integrated Natural Resources Management Plan for Kirtland Air Force Base

    Science.gov (United States)

    2014-09-01

    e.g., photovoltaic panels, solar collection, heat recovery systems, wind turbines , green roofs, and habitat-oriented storm water management) would...comprehensive range planning, cultural resources management planning, Bird /Wildlife Aircraft Strike Hazard planning, and pest management planning. In addition...manage wildlife resources. Assessment of wildlife populations at Kirtland AFB (e.g., bats, birds , predators, and herptiles) would provide a baseline that

  19. Planning and roadmapping technological innovations cases and tools

    CERN Document Server

    Pizarro, Melinda; Talla, Rajasree

    2014-01-01

    Across industries, firms vary broadly on how they operate with respect to their Research & Development (R&D) activities.  This volume presents a holistic approach to evaluating the critical elements of R&D management, including planning, organization, portfolio management, project management, and knowledge transfer—by assessing R&D management from different sectors.  Featuring empirical research and in-depth case studies from industries as diverse as medical imaging, electric vehicles, and cyber security, the authors identify common features of successful R&D management, despite fundamental differences, such as company size, number of employees, industry sector, and the R&D budget.  In particular, they consider the implications for decision making with respect to resource allocation and investments, such as site selection, purchasing, and cross-departmental communication.

  20. Assessment, Planning, and Execution Considerations for Conjunction Risk Assessment and Mitigation Operations

    Science.gov (United States)

    Frigm, Ryan C.; Levi, Joshua A.; Mantziaras, Dimitrios C.

    2010-01-01

    An operational Conjunction Assessment Risk Analysis (CARA) concept is the real-time process of assessing risk posed by close approaches and reacting to those risks if necessary. The most effective way to completely mitigate conjunction risk is to perform an avoidance maneuver. The NASA Goddard Space Flight Center has implemented a routine CARA process since 2005. Over this period, considerable experience has been gained and many lessons have been learned. This paper identifies and presents these experiences as general concepts in the description of the Conjunction Assessment, Flight Dynamics, and Flight Operations methodologies and processes. These general concepts will be tied together and will be exemplified through a case study of an actual high risk conjunction event for the Aura mission.

  1. Plan for the long term environmental assessment of geopressured resource development in the Louisiana Gulf Coast Region

    Energy Technology Data Exchange (ETDEWEB)

    Newchurch, E.J.; Bryan, C.F.; Harrison, D.P.; Muller, R.A.; Wilcox, R.E.; Bachman, A.L.; Newman, J.P.; Cunningham, K.J.; Hilding, R.K.; Rehage, J.A.

    1978-07-15

    Results of research to develop a plan for the long-term environmental assessment of geopressured/geothermal resource development in the Louisiana Gulf Coast region are reported. An overall view of the environmental issues facing decision-makers in the area of geopressured resource development is presented, along with a plan for monitoring potential environmental impacts. Separate assessments and plans are presented for geological effects, air and water quality, ecosystem quality, and socioeconomic and cultural considerations. (JGB)

  2. Assessment of the Dutch National Air Quality Plan 2004; Beoordeling van het Nationaal Luchtkwaliteitsplan 2004

    Energy Technology Data Exchange (ETDEWEB)

    Beck, J.P.; Buringh, E.; Wieringa, K.

    2005-02-01

    The Dutch government expects that targets for the reduction of emission of particulates and nitrogen dioxide can not be reached in time. Therefore, the Netherlands is obliged to draft a plan of actions in order to realize those targets within the period that has been agreed upon in the context of the European Union air quality policy. The present plan of action has been assessed by the Netherlands Environmental Assessment Agency (MNP) with regard to the feasibility of the boundary values and the preconditions for action plans as formulated by the European Committee. Also, the plan has been assessed for the prevention or limitation of health effects and the Dutch position with regard to particulates. [Dutch] Het luchtbeleid heeft als doelstelling dat op lange termijn de gezondheidsrisico's en de effecten op ecosystemen en biodiversiteit moeten dalen tot een verwaarloosbaar niveau. Daartoe zijn in Europees verband normen voor de luchtkwaliteit vastgesteld. Nederland verwacht dat met het vastgestelde beleid niet tijdig aan de grenswaarden voor fijn stof en stikstofdioxide zal worden voldaan. Hierdoor is Nederland verplicht om een actieplan op te stellen. De uitvoering ervan zal er toe moeten leiden dat Nederland alsnog de doelen binnen de gestelde termijn haalt. Het Milieu- en Natuurplanbureau (MNP) van het RIVM heeft het actieplan getoetst aan de haalbaarheid van grenswaarden en aan de voorwaarden die door de Europese Commissie voor actieplannen zijn opgesteld. Daarnaast is het plan beoordeeld in het perspectief van de doelstelling van de richtlijn: het voorkomen of verminderen van gezondheidseffecten. Tenslotte geeft de evaluatie aanknopingspunten voor het herijken van de Nederlandse positie in de fijnstofproblematiek.

  3. Clinical trials radiotherapy treatment plan review software : is this the first quantified assessment

    International Nuclear Information System (INIS)

    Hatton, J.A.; Cornes, D.A.

    2011-01-01

    Full text: Clinical trials require robust quality assurance (QA) procedures to ensure commonality of all treatments, with independent reviews to assess compliance with trial protocols. All clinical trials tools, including QA software, require testing for validity and reliability. enabling inter- and intra-trial comparison. Unlike clinical radiotherapy treatment planning (RTP) systems, review software has no published guidelines. This study describes the design and development of a test suite to quantify the performance of review software in TROG clinical trials. Test areas are image handling and reconstruction; geometric accuracy; dosimetric accuracy; dose-volume histogram (DVH) calculation; display of plan parameters. TROG have developed tests for commissioning plan review software, assessed with SWAN 2.3, and CMS Elekta FocalPro. While image handling tests were based on published guidelines for RTP systems, dosimetric tests used the TROG QA case review requirements. Treatment plans represented systems of all manufacturers (Pinnacle, Eclipse, Xio and Oncentra) used in Australasian centres. The test suite identified areas for SW A software development, including the DVH algorithm, changed to reduce calculation time. Results, in Fig. I, for known volumes of varying shapes and sizes, demonstrate differences between SWAN 2.1 and 2.3 when compared with Eclipse. Liaison with SWAN programmers enabled re-instatement of 2.1 algorithm. The test suite has quantified the RTP review software, prioritised areas for development with the programmers, and improved the user experience.

  4. Application of an uncertainty analysis approach to strategic environmental assessment for urban planning.

    Science.gov (United States)

    Liu, Yi; Chen, Jining; He, Weiqi; Tong, Qingyuan; Li, Wangfeng

    2010-04-15

    Urban planning has been widely applied as a regulatory measure to guide a city's construction and management. It represents official expectations on future population and economic growth and land use over the urban area. No doubt, significant variations often occur between planning schemes and actual development; in particular in China, the world's largest developing country experiencing rapid urbanization and industrialization. This in turn leads to difficulty in estimating the environmental consequences of the urban plan. Aiming to quantitatively analyze the uncertain environmental impacts of the urban plan's implementation, this article developed an integrated methodology combining a scenario analysis approach and a stochastic simulation technique for strategic environmental assessment (SEA). Based on industrial development scenarios, Monte Carlo sampling is applied to generate all possibilities of the spatial distribution of newly emerged industries. All related environmental consequences can be further estimated given the industrial distributions as input to environmental quality models. By applying a HSY algorithm, environmentally unacceptable urban growth, regarding both economic development and land use spatial layout, can be systematically identified, providing valuable information to urban planners and decision makers. A case study in Dalian Municipality, Northeast China, is used to illustrate applicability of this methodology. The impacts of Urban Development Plan for Dalian Municipality (2003-2020) (UDP) on atmospheric environment are also discussed in this article.

  5. Environmental impact assessment in urban transport planning: Exploring process-related barriers in Spanish practice

    Energy Technology Data Exchange (ETDEWEB)

    Soria-Lara, Julio A., E-mail: j.a.sorialara@uva.nl; Bertolini, Luca, E-mail: l.bertolini@uva.nl; Brömmelstroet, Marco te, E-mail: M.C.G.teBrommelstroet@uva.nl

    2015-01-15

    The effectiveness of EIA for evaluating transport planning projects is increasingly being questioned by practitioners, institutions and scholars. The academic literature has traditionally focused more on solving content-related problems with EIA (i.e. the measurement of environmental effects) than on process-related issues (i.e. the role of EIA in the planning process and the interaction between key actors). Focusing only on technical improvements is not sufficient for rectifying the effectiveness problems of EIA. In order to address this knowledge gap, the paper explores how EIA is experienced in the Spanish planning context and offers in-depth insight into EIA process-related issues in the field of urban transport planning. From the multitude of involved actors, the research focuses on exploring the perceptions of the two main professional groups: EIA developers and transport planners. Through a web-based survey we assess the importance of process-related barriers to the effective use of EIA in urban transport planning. The analyses revealed process issues based fundamentally on unstructured stakeholders involvement and an inefficient public participation - Highlights: • Qualitative research on perceptions of EIA participants on EIA processes. • Web-based survey with different participants (EIA-developers; transport planners). • It was seen an inefficient participation of stakeholders during the EIA processes.

  6. Environmental impact assessment in urban transport planning: Exploring process-related barriers in Spanish practice

    International Nuclear Information System (INIS)

    Soria-Lara, Julio A.; Bertolini, Luca; Brömmelstroet, Marco te

    2015-01-01

    The effectiveness of EIA for evaluating transport planning projects is increasingly being questioned by practitioners, institutions and scholars. The academic literature has traditionally focused more on solving content-related problems with EIA (i.e. the measurement of environmental effects) than on process-related issues (i.e. the role of EIA in the planning process and the interaction between key actors). Focusing only on technical improvements is not sufficient for rectifying the effectiveness problems of EIA. In order to address this knowledge gap, the paper explores how EIA is experienced in the Spanish planning context and offers in-depth insight into EIA process-related issues in the field of urban transport planning. From the multitude of involved actors, the research focuses on exploring the perceptions of the two main professional groups: EIA developers and transport planners. Through a web-based survey we assess the importance of process-related barriers to the effective use of EIA in urban transport planning. The analyses revealed process issues based fundamentally on unstructured stakeholders involvement and an inefficient public participation - Highlights: • Qualitative research on perceptions of EIA participants on EIA processes. • Web-based survey with different participants (EIA-developers; transport planners). • It was seen an inefficient participation of stakeholders during the EIA processes

  7. The Assessment of Lesson Plans in Teacher Education: A Case Study in Assessment Validity and Reliability

    Science.gov (United States)

    Tummons, Jonathan

    2010-01-01

    This paper forms part of an exploration of assessment on one part-time higher education (HE) course: an in-service, professional qualification for teachers and trainers in the learning and skills sector which is delivered on a franchise basis across a network of further education colleges in the north of England. This paper proposes that the…

  8. Assessing Technical and Programmatic Viability of Nuclear Waste and Material Stream Disposition Plans

    International Nuclear Information System (INIS)

    R. S. Hill; B. Griebenow

    1999-01-01

    The U.S. Department of Energy (DOE), Office of Environmental Management (EM) has responsibility for cleanup and disposition of nuclear wastes and excess materials that are a legacy of the nuclear arms race. In fulfilling this responsibility, EM applies a systems engineering approach to identify baseline disposition plans for the wastes and materials (storage, stabilization, treatment, and disposal), assess the path viability, and develop integration opportunities to improve the disposition viability or to combine, eliminate, and/or simplify activities, technologies, and facilities across the DOE Complex, evaluate the baseline and alternatives to make informed decisions, and implement and track selected opportunities. This paper focuses on processes used to assess the disposition path viability - the likelihood that current planning for disposition of nuclear waste and materials can be implemented

  9. How consistent is teachers’ planning, implementation, and assessment in character education?

    Directory of Open Access Journals (Sweden)

    Luh Gd Rahayu Budiarta

    2018-01-01

    Full Text Available This descriptive case study aims at investigating how teachers planned, practiced, assessed students’ character development in the classroom. The study involved 29 students of Grade 5, a classroom, and an English teacher. The instruments include classroom observation, checklist, interview guide, field note, and video recording. The obtained data were analyzed by using analysis method by Miles and Huberman (1994. The result of the research shows that there were ten characters values detected in the lesson plans, however, only 55% consistently appeared in the teaching and learning process. Teachers were found to use performance rubrics and diary to keep record on students’ character development. The interview revealed that there was reluctance regarding role of teacher in term of assessing students’ characters. This fact implies that there should be intensive training and workshop for the teachers to improve the quality of the character education practices in elementary schools in Bali.

  10. Tumulus Disposal Demonstration Project assessment plan for potential worker exposure: Revision 1

    International Nuclear Information System (INIS)

    Styers, D.R.

    1989-03-01

    The purpose of the ''Assessment Plan for Potential Worker Exposure'' is to determine the potential radiological exposures to the workers as they dispose of low-level radioactive wastes (LLW) on the Tumulus Disposal Demonstration Project (TDDP). An evaluation of the work procedures and precautions will be made so as to maintain the exposure levels As Low As Reasonably Achievable (ALARA). 10 refs., 10 figs

  11. Implementing Trauma-Informed Partner Violence Assessment in Family Planning Clinics.

    Science.gov (United States)

    Decker, Michele R; Flessa, Sarah; Pillai, Ruchita V; Dick, Rebecca N; Quam, Jamie; Cheng, Diana; McDonald-Mosley, Raegan; Alexander, Kamila A; Holliday, Charvonne N; Miller, Elizabeth

    2017-09-01

    Intimate partner violence (IPV) and reproductive coercion (RC) are associated with poor reproductive health. Little is known about how family planning clinics implement brief IPV/RC assessment interventions in practice. We describe the uptake and impact of a brief, trauma-informed, universal IPV/RC assessment and education intervention. Intervention implementation was evaluated via a mixed methods study among women ages 18 and up receiving care at one of two family planning clinics in greater Baltimore, MD. This mixed methods study entailed a quasi-experimental, single group pretest-posttest study with family planning clinic patients (baseline and exit survey n = 132; 3-month retention n = 68; retention rate = 52%), coupled with qualitative interviews with providers and patients (total n = 35). Two thirds (65%) of women reported receiving at least one element of the intervention on their exit survey immediately following the clinic-visit. Patients reported that clinic-based IPV assessment is helpful, irrespective of IPV history. Relative to those who reported neither, participants who received either intervention element reported greater perceived caring from providers, confidence in provider response to abusive relationships, and knowledge of IPV-related resources at follow-up. Providers and patients alike described the educational card as a valuable tool. Participants described trade-offs of paper versus in-person, electronic medical record-facilitated screening, and patient reluctance to disclose current situations of abuse. In real-world family planning clinic settings, a brief assessment and support intervention was successful in communicating provider caring and increasing knowledge of violence-related resources, endpoints previously deemed valuable by IPV survivors. Results emphasize the merit of universal education in IPV/RC clinical interventions over seeking IPV disclosure.

  12. A planning-oriented sustainability assessment framework for peri-urban water management in developing countries.

    Science.gov (United States)

    Starkl, Markus; Brunner, Norbert; López, Eduardo; Martínez-Ruiz, José Luis

    2013-12-15

    DPSIR and the three-pillar model are well-established frameworks for sustainability assessment. This paper proposes a planning-oriented sustainability assessment framework (POSAF). It is informed by those frameworks but differs insofar as it puts more emphasis on a constructivist conception which recognises that sustainability needs to be defined anew for each planning problem. In finding such a consensus definition, POSAF uses participatory scenario analysis and participatory planning, technical feasibility study, participatory assessment, analysis of trade-offs and social networks in an unusual combination and for goals that differ from the original conceptions of these methods. POSAF was applied in a peri-urban area of Mexico City for the design of improved water service provision, integrating solid waste management. It supported consensus amongst users about the importance of environmental issues, informed planners about the values of stakeholders and users, detected local differences, and identified possible conflicts at an early stage of decision-making. Copyright © 2013 Elsevier Ltd. All rights reserved.

  13. Institutional Design for Strategic Environmental Assessment on Urban Economic and Social Development Planning in China

    International Nuclear Information System (INIS)

    Song Guojun; Zhou Li; Zhang Lei

    2011-01-01

    The National Economic and Social Development Plans (NESDPs) of cities in China, given their comprehensive, integrated and strategic nature, have significant and profound impacts on the development of cities and their embedded ecological environments. Strategic Environmental Assessments (SEAs) on city NESDPs have the potential to improve environmental policy integration at strategic level and to safeguard the sustainable development of cities. However, these plans are normally exempted from the current SEA requirement in China. We argue that it is more feasible to apply SEAs on city NESDPs before SEAs are expanded to higher level NESDPs in China. This article attempts to propose a China-specific institutional design for SEAs on city NESDPs based on experiments in selected cities and within the current legal framework. To obtain a holistic view about the long-term development of cities, more qualitative and descriptive analysis-based assessment methods should be adopted to broaden participation, to encourage the exchange of information and to reach consensus. - Highlights: → National Economic and Social Development Plans for Cities (NESDPs) in China is a very popular and significant decision made by municipal government. → We propose a institutional framework to conduct strategic environmental assessment to NESDPs. → The key features of the institutional framework are the independent SEA approval committee and a professional consulting agency.

  14. Environmental assessment and planning theory: four short stories about power, multiple rationality, and ethics

    International Nuclear Information System (INIS)

    Richardson, Tim

    2005-01-01

    This paper engages with recent debates in the environmental assessment (EA) literature about the lessons that can be learned from planning theory. It argues that the current communicative turn in EA, echoing a similar shift in planning thought in the 1990s, has failed to benefit from this earlier experience. Instead of following this trend, the paper examines EA from a perspective which is more closely aligned with some of the critics of the communicative approach, and which combines concepts of power, rationality, value and ethics in a different way. First, the paper briefly sets out how planning theory has engaged with these concepts. It then argues that EA needs to engage with competing multiple rationalities, and the inescapable presence of value conflicts within EA. It then turns to recent debates in EA to show how the question of value has become a very difficult issue for EA theorists. These issues are then explored by looking at four cases where environmental impact assessment (EIA) and strategic environmental assessment (SEA) become dramatic sites of struggle, in very different ways: where the boundaries between facts, boundaries, and opinions are defined through power struggles; where SEA is used as a process of brokerage between a fragile coalition of interests; where power defines rationality in the construction of an SEA instrument; and where EIA is challenged from the outside by civil society. The paper closes by discussing how EA practitioners can operate reflexively and ethically in a world of contested rationality

  15. THE UNCERTAINTIES ON THE GIS BASED LAND SUITABILITY ASSESSMENT FOR URBAN AND RURAL PLANNING

    Directory of Open Access Journals (Sweden)

    H. Liu

    2017-09-01

    Full Text Available The majority of the research on the uncertainties of spatial data and spatial analysis focuses on some specific data feature or analysis tool. Few have accomplished the uncertainties of the whole process of an application like planning, making the research of uncertainties detached from practical applications. The paper discusses the uncertainties of the geographical information systems (GIS based land suitability assessment in planning on the basis of literature review. The uncertainties considered range from index system establishment to the classification of the final result. Methods to reduce the uncertainties arise from the discretization of continuous raster data and the index weight determination are summarized. The paper analyzes the merits and demerits of the “Nature Breaks” method which is broadly used by planners. It also explores the other factors which impact the accuracy of the final classification like the selection of class numbers, intervals and the autocorrelation of the spatial data. In the conclusion part, the paper indicates that the adoption of machine learning methods should be modified to integrate the complexity of land suitability assessment. The work contributes to the application of spatial data and spatial analysis uncertainty research on land suitability assessment, and promotes the scientific level of the later planning and decision-making.

  16. Readiness assessment plan for the Radioactive Mixed Waste Land Disposal Facility (Trench 31)

    International Nuclear Information System (INIS)

    Irons, L.G.

    1994-01-01

    This document provides the Readiness Assessment Plan (RAP) for the Project W-025 (Radioactive Mixed Waste Land Disposal Facility) Readiness Assessment (RA). The RAP documents prerequisites to be met by the operating organization prior to the RA. The RAP is to be implemented by the RA Team identified in the RAP. The RA Team is to verify the facility's compliance with criteria identified in the RAP. The criteria are based upon the open-quotes Core Requirementsclose quotes listed in DOE Order 5480.31, open-quotes Startup and Restart of Nuclear Facilitiesclose quotes

  17. Methodology, status and plans for development and assessment of Cathare code

    Energy Technology Data Exchange (ETDEWEB)

    Bestion, D.; Barre, F.; Faydide, B. [CEA - Grenoble (France)

    1997-07-01

    This paper presents the methodology, status and plans for the development, assessment and uncertainty evaluation of the Cathare code. Cathare is a thermalhydraulic code developed by CEA (DRN), IPSN, EDF and FRAMATOME for PWR safety analysis. First, the status of the code development and assessment is presented. The general strategy used for the development and the assessment of the code is presented. Analytical experiments with separate effect tests, and component tests are used for the development and the validation of closure laws. Successive Revisions of constitutive laws are implemented in successive Versions of the code and assessed. System tests or integral tests are used to validate the general consistency of the Revision. Each delivery of a code Version + Revision is fully assessed and documented. A methodology is being developed to determine the uncertainty on all constitutive laws of the code using calculations of many analytical tests and applying the Discrete Adjoint Sensitivity Method (DASM). At last, the plans for the future developments of the code are presented. They concern the optimization of the code performance through parallel computing - the code will be used for real time full scope plant simulators - the coupling with many other codes (neutronic codes, severe accident codes), the application of the code for containment thermalhydraulics. Also, physical improvements are required in the field of low pressure transients and in the modeling for the 3-D model.

  18. RELAP-7 Software Verification and Validation Plan - Requirements Traceability Matrix (RTM) Part 2: Code Assessment Strategy, Procedure, and RTM Update

    Energy Technology Data Exchange (ETDEWEB)

    Yoo, Jun Soo [Idaho National Lab. (INL), Idaho Falls, ID (United States); Choi, Yong Joon [Idaho National Lab. (INL), Idaho Falls, ID (United States); Smith, Curtis Lee [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-09-01

    This document addresses two subjects involved with the RELAP-7 Software Verification and Validation Plan (SVVP): (i) the principles and plan to assure the independence of RELAP-7 assessment through the code development process, and (ii) the work performed to establish the RELAP-7 assessment plan, i.e., the assessment strategy, literature review, and identification of RELAP-7 requirements. Then, the Requirements Traceability Matrices (RTMs) proposed in previous document (INL-EXT-15-36684) are updated. These RTMs provide an efficient way to evaluate the RELAP-7 development status as well as the maturity of RELAP-7 assessment through the development process.

  19. Fostering Change from Within: Influencing Teaching Practices of Departmental Colleagues by Science Faculty with Education Specialties.

    Science.gov (United States)

    Bush, Seth D; Rudd, James A; Stevens, Michael T; Tanner, Kimberly D; Williams, Kathy S

    2016-01-01

    Globally, calls for the improvement of science education are frequent and fervent. In parallel, the phenomenon of having Science Faculty with Education Specialties (SFES) within science departments appears to have grown in recent decades. In the context of an interview study of a randomized, stratified sample of SFES from across the United States, we discovered that most SFES interviewed (82%) perceived having professional impacts in the realm of improving undergraduate science education, more so than in research in science education or K-12 science education. While SFES reported a rich variety of efforts towards improving undergraduate science education, the most prevalent reported impact by far was influencing the teaching practices of their departmental colleagues. Since college and university science faculty continue to be hired with little to no training in effective science teaching, the seeding of science departments with science education specialists holds promise for fostering change in science education from within biology, chemistry, geoscience, and physics departments.

  20. Laying a Foundation for Comparing Departmental Structures between Reference and Instructional Services: Analysis of a Nationwide Survey.

    Science.gov (United States)

    Johnson, Kristin; Fountain, Kathleen Carlisle

    2002-01-01

    Describes a survey of midsized academic libraries that measured the departmental relationship between librarians who provide reference services and librarians who provide instructional services. Discusses satisfaction levels with various organizational arrangements as well as pros and cons of integrated or separate reference and instruction…

  1. Departmentalized, Self-Contained, or Somewhere in Between: Understanding Elementary Grade-Level Organizational Decision-Making

    Science.gov (United States)

    Parker, Audra; Rakes, Lori; Arndt, Katie

    2017-01-01

    Recent trends indicate a move away from self-contained classrooms and toward content-focused departmentalization in elementary schools. This study takes a snapshot of the existing organizational structures used in elementary schools in one district and explores administrators' beliefs and practices regarding this phenomenon. Our findings suggest…

  2. Self-Contained versus Departmentalized Settings in Urban Elementary Schools: An Analysis of Fifth-Grade Student Mathematics Performance

    Science.gov (United States)

    Jack, Diamond Marie

    2014-01-01

    Student achievement in mathematics, particularly in urban areas, is a consistent concern in the United States. Research suggests that teachers either are under qualified or have a negative perception of themselves as mathematics teachers. Departmentalization on the elementary level is an organizational structure that may benefit urban students and…

  3. The association of departmental leadership gender with that of faculty and residents in radiology.

    Science.gov (United States)

    Shah, Anand; Braga, Larissa; Braga-Baiak, Andresa; Jacobs, Danny O; Pietrobon, Ricardo

    2007-08-01

    Although the number of women graduating from medical school continues to increase, their representation in radiology residency programs has not increased over the past 10 years. We examined whether the gender of radiology faculty and residents differed according to the gender of the departmental leadership. We issued an anonymous Web-based survey via e-mail to all 188 radiology residency program directors listed in the Fellowship and Residency Electronic Interactive Database (FREIDA Online). Data regarding the gender of the department chairperson, residency program director, faculty, and residents were collected. The institutional review board granted a waiver for this study, and all subjects provided informed consent. Of the 84 program directors who responded, 9 (10.7%) were chaired by females and 75 (89.3%) by males; residency program director positions were held by 36 (42.9%) females and 48 (57.1%) males. More programs were located in the northeastern United States (n = 31, 36.9%) than in any other region, and more were self-described as academic (n = 36, 42.9%) than any other practice type. Programs that were led by a male chairperson had a similar proportion of female faculty (25.2% versus 27.3%; P = .322) and residents (26.2% versus 27.4%; P = .065) compared with those led by a female. Similarly, radiology departments with a male residency program director had a similar proportion of female residents (24.8% versus 28.7%; P = .055) compared with programs with a female residency program director. The gender composition of radiology faculty and residents does not differ significantly according to the gender of the departmental chairperson or residency program director. Nevertheless, there continues to be a disparity in the representation of women among radiology faculty and residents.

  4. Assessing the Intra-Departmental Social Networks of Male and Female STEM Faculty: A Preliminary Analysis

    OpenAIRE

    Holloway, Stacie F, PhD; Kallen, Rachel, PhD; Howe, Steve, PhD; Eiler, Brian

    2014-01-01

    Social relationships and intra-organizational networking have repeatedly been shown to predict career success.[1] However, building social networks may become difficult when STEM women enter into an area where they are judged, implicitly or explicitly, to be less competent outsiders. Social networks can also become more difficult to manage when work-life demands become unmanageable. Thus, a key component to analyzing the success of the ADVANCE program at the University of Cincinnati (UC LEAF)...

  5. Assessment of China's renewable energy contribution during the 12th Five Year Plan

    International Nuclear Information System (INIS)

    Hong, Lixuan; Zhou, Nan; Fridley, David; Raczkowski, Chris

    2013-01-01

    In recent years, China has been ambitious in investing and developing renewable energy technologies, aiming to enhance its energy security, mitigate its energy-related CO 2 emissions and develop renewable energy industry. The 12th Five Year Plan (2011–2015) has set clear targets on installed capacities of different renewable energy technologies. This study aimed to assess the possible contribution of 12th Five Year Plan for China's future energy system and identify factors that might influence its impacts. First, current status of renewable energy development in China has been reviewed. Then several energy scenarios have been developed in an hourly simulation using an energy system analysis tool EnergyPLAN. It was identified that existing grid bottleneck would greatly reduce the potential contribution of renewable installations in terms of share of renewable electricity generation, share of non-fossil fuels in primary energy and system CO 2 emissions. In contrast, improving technical performance of renewable energy technologies and sectoral energy efficiency plays an important role in increasing the share of renewables and promoting China’s energy system transition. Finally, some policy suggestions were drawn to facilitate a better implementation of the renewable energy plan. - Highlights: • China's renewable energy contribution during the 12th Five Year Plan was assessed. • Non-fossil fuel targets in primary energy for 2015 and 2020 could be easily achieved. • Grid bottlenecks severely decrease the share of RES-E in electricity generation through the 12th Five Year Period. • Improved technical performance of renewable technologies and sectoral energy efficiency are extremely important for achieving higher RES-E share. • Several policy suggestions were drawn

  6. The impact of adolescent females' assessments of parenthood and employment on plans for the future.

    Science.gov (United States)

    Leslie, L A

    1986-02-01

    This study explores adolescent females' assessments of the rewards and costs of employment and parenthood, and the impact of these assessments on their plans for organizing their adult lives. 549 young women enrolled in the 11th and 12 grades at public schools in New York City completed questionnaires addressing their future work and fertility plans, characteristics of their present family life, and their assessments of how rewarding and costly the roles of employee and parent would be to them. Results suggest that daughters of homemakers and daughters of employed women differ in their assessment of each role, and take different factors into consideration when making these assessments. In evaluating work, daughters whose mothers are employed were likely to depend on their mothers' experiences for guidance. On the other hand, daughters whose mothers are homemakers have to go through a more elaborate process of deduction. They appear to assess whether their mothers are happy where they are now and then project whether another role would be more satisfying. These young women also tend to incorporate the opinion of the father more than do daughters of employed mothers. In evaluating the impact of children, the young woman's relation with her own mother is a critical factor affecting both group' assessments of the costs of children as well as the employed group's assessments of the rewards of children. Finally, the limitations of the sample should be kept in mind when discussing the results. Though the sample was large numerically, the overall response rate was low. In addition, the sample consisted of a large number of Catholic respondents.

  7. Considerations on comprehensive risk assessment and mitigation planning of volcanic ash-fall

    International Nuclear Information System (INIS)

    Toshida, Kiyoshi

    2010-01-01

    Volcanic ash-fall is inevitable hazard throughout Japan, and causes wide range of effects due to its physical and chemical properties. Nuclear power plants in Japan face the necessity to assess the risk from volcanic ash-fall. Risk assessment of the volcanic ash-fall should include engineering solution and mitigation planning as well as the ash-fall hazard. This report points out the characteristics for reducing the various effects of volcanic ash-fall as follows. Large-scale eruptions produce prominent volcanic ash-falls that can approach power plants at a great distance. Aftermath hazards of ash-fall events, such as remobilization of fine ash particles and generation of lahars, require further assessments. The kind and extent of damages becomes greater whenever ash is wet. Wet ash requires separate assessments in contrast to dry ash. The mitigation and recovery measures at power plants involve quick cleanup operations of volcanic ash. Those operations should be prepared through comprehensive risk assessment, and by cooperation with authorities, during pre-eruption repose period. The comprehensive assessment for volcanic ash-fall hazards, however, has yet to be conducted. Development of risk communication method may result in increased implementation mitigation planning. Numerical analysis of the ash-fall hazards provides quantitative data on particle motions that can be used in the risk assessment. In order to implement the quantitative assessment method, the verification on the effect of ambient air condition to the altitude of volcanic ash cloud is necessary. We need to develop a three-dimensional model of volcanic ash cloud, and calculate motions of ash clouds under multiple conditions of ambient air. (author)

  8. A retrospective planning analysis comparing intensity modulated radiation therapy (IMRT) to volumetric modulated arc therapy (VMAT) using two optimization algorithms for the treatment of early-stage prostate cancer

    International Nuclear Information System (INIS)

    Elith, Craig A; Dempsey, Shane E; Warren-Forward, Helen M

    2013-01-01

    The primary aim of this study is to compare intensity modulated radiation therapy (IMRT) to volumetric modulated arc therapy (VMAT) for the radical treatment of prostate cancer using version 10.0 (v10.0) of Varian Medical Systems, RapidArc radiation oncology system. Particular focus was placed on plan quality and the implications on departmental resources. The secondary objective was to compare the results in v10.0 to the preceding version 8.6 (v8.6). Twenty prostate cancer cases were retrospectively planned using v10.0 of Varian's Eclipse and RapidArc software. Three planning techniques were performed: a 5-field IMRT, VMAT using one arc (VMAT-1A), and VMAT with two arcs (VMAT-2A). Plan quality was assessed by examining homogeneity, conformity, the number of monitor units (MUs) utilized, and dose to the organs at risk (OAR). Resource implications were assessed by examining planning and treatment times. The results obtained using v10.0 were also compared to those previously reported by our group for v8.6. In v10.0, each technique was able to produce a dose distribution that achieved the departmental planning guidelines. The IMRT plans were produced faster than VMAT plans and displayed improved homogeneity. The VMAT plans provided better conformity to the target volume, improved dose to the OAR, and required fewer MUs. Treatments using VMAT-1A were significantly faster than both IMRT and VMAT-2A. Comparison between versions 8.6 and 10.0 revealed that in the newer version, VMAT planning was significantly faster and the quality of the VMAT dose distributions produced were of a better quality. VMAT (v10.0) using one or two arcs provides an acceptable alternative to IMRT for the treatment of prostate cancer. VMAT-1A has the greatest impact on reducing treatment time

  9. The Promise, Practice, and State of Planning Tools to Assess Site Vulnerability to Runoff Phosphorus Loss.

    Science.gov (United States)

    Kleinman, P J A; Sharpley, A N; Buda, A R; Easton, Z M; Lory, J A; Osmond, D L; Radcliffe, D E; Nelson, N O; Veith, T L; Doody, D G

    2017-11-01

    Over the past 20 yr, there has been a proliferation of phosphorus (P) site assessment tools for nutrient management planning, particularly in the United States. The 19 papers that make up this special section on P site assessment include decision support tools ranging from the P Index to fate-and-transport models to weather-forecast-based risk calculators. All require objective evaluation to ensure that they are effective in achieving intended benefits to protecting water quality. In the United States, efforts have been underway to compare, evaluate, and advance an array of P site assessment tools. Efforts to corroborate their performance using water quality monitoring data confirms previously documented discrepancies between different P site assessment tools but also highlights a surprisingly strong performance of many versions of the P Index as a predictor of water quality. At the same time, fate-and-transport models, often considered to be superior in their prediction of hydrology and water quality due to their complexity, reveal limitations when applied to site assessment. Indeed, one consistent theme from recent experience is the need to calibrate highly parameterized models. As P site assessment evolves, so too do routines representing important aspects of P cycling and transport. New classes of P site assessment tools are an opportunity to move P site assessment from general, strategic goals to web-based tools supporting daily, operational decisions. Copyright © by the American Society of Agronomy, Crop Science Society of America, and Soil Science Society of America, Inc.

  10. Risk assessment of major hazards and its application in urban planning: a case study.

    Science.gov (United States)

    Zhou, Yafei; Liu, Mao

    2012-03-01

    With the rapid development of industry in China, the number of establishments that are proposed or under construction is increasing year by year, and many are industries that handle flammable, explosive, toxic, harmful, and dangerous substances. Accidents such as fire, explosion, and toxic diffusion inevitably happen. Accidents resulting from these major hazards in cities cause a large number of casualties and property losses. It is increasingly important to analyze the risk of major hazards in cities realistically and to suitably plan and utilize the surrounding land based on the risk analysis results, thereby reducing the hazards. A theoretical system for risk assessment of major hazards in cities is proposed in this article, and the major hazard risk for the entire city is analyzed quantitatively. Risks of various major accidents are considered together, superposition effect is analyzed, individual risk contours of the entire city are drawn out, and the level of risk in the city is assessed using "as low as reasonably practicable" guidelines. After the entire city's individual risk distribution is obtained, risk zones are divided according to corresponding individual risk value of HSE, and land-use planning suggestions are proposed. Finally, a city in China is used as an example to illustrate the risk assessment process of the city's major hazard and its application in urban land-use planning. The proposed method has a certain theoretical and practical significance in establishing and improving risk analysis of major hazard and urban land-use planning. On the one hand, major urban public risk is avoided; further, the land is utilized in the best possible way in order to obtain the maximum benefit from its use. © 2011 Society for Risk Analysis.

  11. Corrective Action Plan in response to the March 1992 Tiger Team Assessment of the Ames Laboratory

    International Nuclear Information System (INIS)

    1992-01-01

    On March 5, 1992, a Department of Energy (DOE) Tiger Team completed an assessment of the Ames Laboratory, located in Ames, Iowa. The purpose of the assessment was to provide the Secretary of Energy with a report on the status and performance of Environment, Safety and Health (ES ampersand H) programs at Ames Laboratory. Detailed findings of the assessment are presented in the report, DOE/EH-0237, Tiger Team Assessment of the Ames Laboratory. This document, the Ames Laboratory Corrective Action Plan (ALCAP), presents corrective actions to overcome deficiencies cited in the Tiger Team Assessment. The Tiger Team identified 53 Environmental findings, from which the Team derived four key findings. In the Safety and Health (S ampersand H) area, 126 concerns were identified, eight of which were designated Category 11 (there were no Category I concerns). Seven key concerns were derived from the 126 concerns. The Management Subteam developed 19 findings which have been summarized in four key findings. The eight S ampersand H Category 11 concerns identified in the Tiger Team Assessment were given prompt management attention. Actions to address these deficiencies have been described in individual corrective action plans, which were submitted to DOE Headquarters on March 20, 1992. The ALCAP includes actions described in this early response, as well as a long term strategy and framework for correcting all remaining deficiencies. Accordingly, the ALCAP presents the organizational structure, management systems, and specific responses that are being developed to implement corrective actions and to resolve root causes identified in the Tiger Team Assessment. The Chicago Field Office (CH), IowaState University (ISU), the Institute for Physical Research and Technology (IPRT), and Ames Laboratory prepared the ALCAP with input from the DOE Headquarters, Office of Energy Research (ER)

  12. Assessing Ecosystem Service Provision Under Climate Change to Support Conservation and Development Planning in Myanmar

    Science.gov (United States)

    Mandle, Lisa; Wolny, Stacie; Bhagabati, Nirmal; Helsingen, Hanna; Hamel, Perrine; Bartlett, Ryan; Dixon, Adam; Horton, Radley M.; Lesk, Corey; Manley, Danielle; hide

    2017-01-01

    Inclusion of ecosystem services (ES) information into national-scale development and climate adaptation planning has yet to become common practice, despite demand from decision makers. Identifying where ES originate and to whom the benefits flowunder current and future climate conditionsis especially critical in rapidly developing countries, where the risk of ES loss is high. Here, using Myanmar as a case study, we assess where and how ecosystems provide key benefits to the countrys people and infrastructure. We model the supply of and demand for sediment retention, dry-season baseflows, flood risk reduction and coastal storm protection from multiple beneficiaries. We find that locations currently providing the greatest amount of services are likely to remain important under the range of climate conditions considered, demonstrating their importance in planning for climate resilience. Overlap between priority areas for ES provision and biodiversity conservation is higher than expected by chance overall, but the areas important for multiple ES are underrepresented in currently designated protected areas and Key Biodiversity Areas. Our results are contributing to development planning in Myanmar, and our approach could be extended to other contexts where there is demand for national-scale natural capital information to shape development plans and policies

  13. An inexact multi-objective programming approach for strategic environmental assessment on regional development plan

    Institute of Scientific and Technical Information of China (English)

    WANG Jihua; GUO Huaicheng; LIU Lei; HAO Mingjia; ZHANG Ming; LU Xiaojian; XING Kexia

    2004-01-01

    This paper presents the development of an inexact multi-objective programming (IMOP) model and its application to the strategic environmental assessment (SEA) for the regional development plan for the Hunnan New Zone (HNZ) in Shenyang City, China. Inexact programming and multi-objective programming methods are employed to effectively account for extensive uncertainties in the study system and to reflect various interests from different stakeholders, respectively. In the case study, balancing-economy-and-environment scenario and focusing-industry-development scenario are analyzed by the interactive solution process for addressing the preferences from local authorities and compromises among different objectives. Through interpreting the model solutions under both scenarios, analysis of industrial structure, waste water treatment plant(WWTP) expansion, water consumption and pollution generation and treatment are undertaken for providing a solid base to justify and evaluate the HNZ regional development plan. The study results show that the developed IMOP-SEA framework is feasible and applicable in carrying comprehensive environmental impact assessments for development plan in a more effective and efficient manner.

  14. Reviewing the quality of strategic environmental assessment reports for English spatial plan core strategies

    International Nuclear Information System (INIS)

    Fischer, Thomas B.

    2010-01-01

    This paper summarises the results of a research project from early 2008, involving the author of this paper, as well as 18 post-graduate University of Liverpool students, in which the quality of European Directive based strategic environmental assessment (SEA) reports of English spatial plan core strategies (conducted within the context of the spatial planning sustainability appraisal-SA-regime) was reviewed. The project aimed at establishing the extensiveness of emerging spatial plan related SEA practice, as well as highlighting shortcomings and problems. Overall, it was found that whilst some aspects of assessment were done well, others were not of a satisfactory quality. Shortcomings were connected particularly with the practice of listing potentially relevant baseline documents and data without distinguishing sufficiently between those that are important in terms of significant impacts and those that are not. Problems were also found to exist with the evaluation of options and impacts, the consideration of substantive aspects, such as health, as well as regarding the formulation of final recommendations and monitoring.

  15. A study to assess the effectiveness of planned exercise programme in patients with schizophrenia

    Directory of Open Access Journals (Sweden)

    Bineeta Nath

    2015-01-01

    Full Text Available Background: Psychotic disorders are some of the most severe, chronic, and intractable psychiatric disorders. Schizophrenia is a common and unsolved mental health problem in the world today. Negative symptoms are those symptoms that tend to reflect diminution or loss of normal functions like apathy, anhedonia, alogia, avolition, affective flattening, or social isolation. Exercise is useful for the reduction of some of the negative symptoms of schizophrenia, depression, and anxiety, and also to reduce auditory hallucinations and improve sleep patterns, self-esteem, and general behaviour in people living with schizophrenia. Aim of the study was to assess the effectiveness of planned exercise programme in negative symptoms among patients with schizophrenia. Methodology: A quasi experimental research design was used for this study. Total 60 samples were assigned into two groups with 30 in control group and 30 in experimental group. The data was collected by using structured socio-demographic proforma, Positive and Negative Syndrome Scale, and Scale for Assessment of Negative symptoms. Result: There was a statistically significant difference in pre and post test scores in both control and experimental groups. But statistically significant difference in post test mean scores on negative symptoms between control and experimental groups indicated effectiveness of planned exercise programme along with medical and nursing care. Conclusion: The findings concluded that planned exercise programme with routine medical and nursing care was effective in reduction of negative symptoms in schizophrenia patients.

  16. Comprehensive Care Plan Development Using Resident Assessment Instrument Framework: Past, Present, and Future Practices

    Directory of Open Access Journals (Sweden)

    Mary Ellen Dellefield

    2015-10-01

    Full Text Available Development of the comprehensive care plan (CCP is a requirement for nursing homes participating in the federal Medicare and Medicaid programs, referred to as skilled nursing facilities. The plan must be developed within the context of the comprehensive interdisciplinary assessment framework—the Resident Assessment Instrument (RAI. Consistent compliance with this requirement has been difficult to achieve. To improve the quality of CCP development within this framework, an increased understanding of complex factors contributing to inconsistent compliance is required. In this commentary, we examine the history of the comprehensive care plan; its development within the RAI framework; linkages between the RAI and registered nurse staffing; empirical evidence of the CCP’s efficacy; and the limitations of extant standards of practices in CCP development. Because of the registered nurse’s educational preparation, professional practice standards, and licensure obligations, the essential contributions of professional nurses in CCP development are emphasized. Recommendations for evidence-based micro and macro level practice changes with the potential to improve the quality of CCP development and regulatory compliance are presented. Suggestions for future research are given.

  17. A technology-assessment methodology for electric utility planning: With application to nuclear power plant decommissioning

    International Nuclear Information System (INIS)

    Lough, W.T.

    1987-01-01

    Electric utilities and public service commissions have not taken full advantage of the many proven methodologies and techniques available for evaluating complex technological issues. In addition, evaluations performed are deficient in their use of (1) methods for evaluating public attitudes and (2) formal methods of analysis for decision making. These oversight are substantiated through an examination of the literature relevant to electric utility planning. The assessment process known as technology assessment or TA is proposed, and a TA model is developed for route in use in utility planning by electric utilities and state regulatory commissions. Techniques to facilitate public participation and techniques to aid decision making are integral to the proposed model and are described in detail. Criteria are provided for selecting an appropriate technique on a case-by-case basis. The TA model proved to be an effective methodology for evaluating technological issues associated with electric utility planning such as decommissioning nuclear power plants. Through the use of the nominal group technique, the attitudes of a group of residential ratepayers were successfully identified and included in the decision-making process

  18. Framework for integration of urban planning, strategic environmental assessment and ecological planning for urban sustainability within the context of China

    International Nuclear Information System (INIS)

    He Jia; Bao Cunkuan; Shu Tingfei; Yun Xiaoxue; Jiang Dahe; Brwon, Lex

    2011-01-01

    Sustainable development or sustainability has been highlighted as an essential principle in urban master planning, with increasing recognition that uncontrollable urbanization may well give rise to various issues such as overexploitation of natural resources, ecosystem destruction, environmental pollution and large-scale climate change. Thus, it is deemed necessary to modify the existing urban and regional administrative system so as to cope with the challenges urban planning is being confronted with and realize the purpose of urban sustainability. This paper contributed to proposing a mechanism which helps to make urban planning with full consideration of issues with respect to sustainable development. We suggested that the integration of urban planning, SEA and ecological planning be a multi-win strategy to offset deficiency of each mentioned political tool being individually applied. We also proposed a framework where SEA and ecological planning are fully incorporated into urban planning, which forms a two-way constraint mechanism to ascertain environmental quality of urban planning, although in practice, planning and SEA processes may conditionally be unified. Moreover, as shown in the case study, the integration of the three political tools may be constrained due to slow changes in the contextual factors, in particular the political and cultural dimensions. Currently within the context of China, there may be three major elements which facilitate integration of the three political tools, which are (1) regulatory requirement of PEIA on urban planning, (2) the promotion or strong administrative support from government on eco-district building, and (3) the willingness of urban planners to collaborate with SEA experts or ecologists.

  19. Tiering strategic environmental assessment and project environmental impact assessment in highway planning in Sao Paulo, Brazil

    International Nuclear Information System (INIS)

    Sanchez, Luis E.; Silva-Sanchez, Solange S.

    2008-01-01

    Constructing highways in dense urban areas is always a challenge. In Sao Paulo Metropolitan Region, heavy truck traffic contributes to clog streets and expressways alike. As part of the traffic neither originates nor head to the region, a peripheral highway has been proposed to reduce traffic problems. This project, called Rodoanel, is an expressway approximately 175 km long. The fact that the projected south and north sections would cross catchments that supply most of the metropolis water demand was strongly disputed and made the environmental permitting process particularly difficult. The agency in charge commissioned a strategic environmental assessment (SEA) of a revamped project, and called it the Rodoanel Programme. However, the SEA report failed to satisfactorily take account of significant strategic issues. Among these, the highway potential effect of inducing urban sprawl over water protection zones is the most critical issue, as it emerged later as a hurdle to project licensing. Conclusion is that, particularly where no agreed-upon framework for SEA exists, when vertical tiering with downstream project EIA is sought, then a careful scoping of strategic issues is more than necessary. If an agreement on 'what is strategic' is not reached and not recognized by influential stakeholders, then the unsettled conflicts will be transferred to project EIA. In such a context, SEA will have added another loop to the usually long road to project approval

  20. SUSTAINABILITY ASSESSMENT IN URBAN PLANNING. A CHALLENGE FOR A METHODOLOGICAL CONSTRUCTION: MONTREAL AS CASE STUDY

    Directory of Open Access Journals (Sweden)

    María de Lourdes Flores Lucero

    2014-09-01

    Full Text Available In this paper we describe the methodological process for the qualitative evaluation of the concept of sustainability and its application in the island of Montreal. At the same time we present our theoretical approach and the main results issued of the assessment. We take as analytical tools the Montreal Urban Plan of 2004 and the Strategic Plan for Sustainable Development 2005. We conclude with two main points, first, that the theoretical and pragmatic aspects of urban sustainability in Montreal have been treated in an organic, complex, dynamic and flexible way, allowing social participation and the inclusion of the values of all stakeholders, which are both key elements to follow the path towards sustainability; and secondly, that the approach to an object with such features requires the construction of complex, organic and methodological processes.

  1. Assessment of waste characteristics and waste management practices for the Midwest Compact Region: Regional Management Plan

    International Nuclear Information System (INIS)

    1986-01-01

    This report has described how the Midwest Compact region's low-level radioactive waste characteristics were determined and has provided assessments of several key characteristics of the waste. Sources of the data used and comments on the validity and uncertainty of both the raw information and the region-wide estimates that have been generated are indicated. The contents and organization of the computerized Midwest Data Base are also presented. This data base is a resource for rational development of the Midwest Compact's Regional Management Plan. The value of the level of detail contained in Midwest Data Base is demonstrated in its use to analyze the viability of LLW treatment alternatives in other aspects of the regional management plan (RAE86). 10 refs., 7 figs., 13 tabs

  2. The insertion of environmental impact assessment in the planning process of electrical energy transmission systems

    International Nuclear Information System (INIS)

    Pires, S.H.

    1994-03-01

    The main objective of this work is to identify and propose adequate methodologies in each stage of the planning process of electrical energy transmission systems. The aim is to incorporate the environmental dimension as a variable of this process, along with the economic and technical aspects. All these factors are to be taken into consideration in the decision-making, design and management of these projects. The environmental impact assessment (EIA) concepts, methods and procedures were analysed, as well as the roles that it should play, as a means to become the effective instrument of the Environmental Policy. In this study we analysed the whole planning process of the implementation of transmission lines and their impact on the environment. The current attitudes about this subject were investigated and scrutinized. Critical evaluations were made to suggest an orientation in the formulation of the proposed methodology. (author). 125 refs, 11 figs, 13 tabs

  3. SU-E-T-616: Plan Quality Assessment of Both Treatment Planning System Dose and Measurement-Based 3D Reconstructed Dose in the Patient

    International Nuclear Information System (INIS)

    Olch, A

    2015-01-01

    Purpose: Systematic radiotherapy plan quality assessment promotes quality improvement. Software tools can perform this analysis by applying site-specific structure dose metrics. The next step is to similarly evaluate the quality of the dose delivery. This study defines metrics for acceptable doses to targets and normal organs for a particular treatment site and scores each plan accordingly. The input can be the TPS or the measurement-based 3D patient dose. From this analysis, one can determine whether the delivered dose distribution to the patient receives a score which is comparable to the TPS plan score, otherwise replanning may be indicated. Methods: Eleven neuroblastoma patient plans were exported from Eclipse to the Quality Reports program. A scoring algorithm defined a score for each normal and target structure based on dose-volume parameters. Each plan was scored by this algorithm and the percentage of total possible points was obtained. Each plan also underwent IMRT QA measurements with a Mapcheck2 or ArcCheck. These measurements were input into the 3DVH program to compute the patient 3D dose distribution which was analyzed using the same scoring algorithm as the TPS plan. Results: The mean quality score for the TPS plans was 75.37% (std dev=14.15%) compared to 71.95% (std dev=13.45%) for the 3DVH dose distribution. For 3/11 plans, the 3DVH-based quality score was higher than the TPS score, by between 0.5 to 8.4 percentage points. Eight/11 plans scores decreased based on IMRT QA measurements by 1.2 to 18.6 points. Conclusion: Software was used to determine the degree to which the plan quality score differed between the TPS and measurement-based dose. Although the delivery score was generally in good agreement with the planned dose score, there were some that improved while there was one plan whose delivered dose quality was significantly less than planned. This methodology helps evaluate both planned and delivered dose quality. Sun Nuclear Corporation has

  4. SU-E-T-616: Plan Quality Assessment of Both Treatment Planning System Dose and Measurement-Based 3D Reconstructed Dose in the Patient

    Energy Technology Data Exchange (ETDEWEB)

    Olch, A [University of Southern California, Los Angeles, CA (United States)

    2015-06-15

    Purpose: Systematic radiotherapy plan quality assessment promotes quality improvement. Software tools can perform this analysis by applying site-specific structure dose metrics. The next step is to similarly evaluate the quality of the dose delivery. This study defines metrics for acceptable doses to targets and normal organs for a particular treatment site and scores each plan accordingly. The input can be the TPS or the measurement-based 3D patient dose. From this analysis, one can determine whether the delivered dose distribution to the patient receives a score which is comparable to the TPS plan score, otherwise replanning may be indicated. Methods: Eleven neuroblastoma patient plans were exported from Eclipse to the Quality Reports program. A scoring algorithm defined a score for each normal and target structure based on dose-volume parameters. Each plan was scored by this algorithm and the percentage of total possible points was obtained. Each plan also underwent IMRT QA measurements with a Mapcheck2 or ArcCheck. These measurements were input into the 3DVH program to compute the patient 3D dose distribution which was analyzed using the same scoring algorithm as the TPS plan. Results: The mean quality score for the TPS plans was 75.37% (std dev=14.15%) compared to 71.95% (std dev=13.45%) for the 3DVH dose distribution. For 3/11 plans, the 3DVH-based quality score was higher than the TPS score, by between 0.5 to 8.4 percentage points. Eight/11 plans scores decreased based on IMRT QA measurements by 1.2 to 18.6 points. Conclusion: Software was used to determine the degree to which the plan quality score differed between the TPS and measurement-based dose. Although the delivery score was generally in good agreement with the planned dose score, there were some that improved while there was one plan whose delivered dose quality was significantly less than planned. This methodology helps evaluate both planned and delivered dose quality. Sun Nuclear Corporation has

  5. Multi-actor involvement for integrating ecosystem services in strategic environmental assessment of spatial plans

    Energy Technology Data Exchange (ETDEWEB)

    Rozas-Vásquez, Daniel, E-mail: danielrozas@gmail.com [Center for Development Research, Dept. Ecology and Natural Resources Management, University of Bonn, Walter Flex Str. 3, 53113 Bonn (Germany); Laboratorio de Planificación Territorial, Universidad Católica de Temuco, Rudecindo ortega, 02950 Temuco (Chile); Fürst, Christine [Martin Luther University Halle-Wittenberg, Dept. Natural Sciences III, Institute for Geosciences and Geography, Von Seckendorff-Platz 4, 06120 Halle-Saale (Germany); Geneletti, Davide [University of Trento, Department of Civil, Environmental and Mechanical Engineering, via Mesiano, 77, Trento 38123 (Italy); Muñoz, Francisco [Laboratorio de Planificación Territorial, Universidad Católica de Temuco, Rudecindo ortega, 02950 Temuco (Chile)

    2017-01-15

    Integrating an ecosystem services (ES) approach into Strategic Environmental Assessment (SEA) of spatial plans potentially enhances the consideration of the value of nature in decision making and policy processes. However, there is increasing concern about the institutional context and a lack of a common understanding of SEA and ecosystem services for adopting them as an integrated framework. This paper addresses this concern by analysing the current understanding and network relations in a multi-actor arrangement as a first step towards a successful integration of ES in SEA and spatial planning. Our analysis focuses on a case study in Chile, where we administered a questionnaire survey to some of the main actors involved in the spatial planning process. The questionnaire focused on issues such as network relations among actors and on conceptual understanding, perceptions and challenges for integrating ES in SEA and spatial planning, knowledge on methodological approaches, and the connections and gaps in the science-policy interface. Our findings suggest that a common understanding of SEA and especially of ES in a context of multiple actors is still at an initial stage in Chile. Additionally, the lack of institutional guidelines and methodological support is considered the main challenge for integration. We conclude that preconditions exist in Chile for integrating ES in SEA for spatial planning, but they strongly depend on appropriate governance schemes that promote a close science-policy interaction, as well as collaborative work and learning. - Highlights: • Linking ecosystem services in SEA is an effective framework for sustainability. • Multi-actor understanding and networks in ecosystem services and SEA were analyzed. • Understanding of SEA and especially of ES is still in an initial stage in Chile. • A lack of institutional guidelines is one of the key challenges for this link.

  6. Multi-actor involvement for integrating ecosystem services in strategic environmental assessment of spatial plans

    International Nuclear Information System (INIS)

    Rozas-Vásquez, Daniel; Fürst, Christine; Geneletti, Davide; Muñoz, Francisco

    2017-01-01

    Integrating an ecosystem services (ES) approach into Strategic Environmental Assessment (SEA) of spatial plans potentially enhances the consideration of the value of nature in decision making and policy processes. However, there is increasing concern about the institutional context and a lack of a common understanding of SEA and ecosystem services for adopting them as an integrated framework. This paper addresses this concern by analysing the current understanding and network relations in a multi-actor arrangement as a first step towards a successful integration of ES in SEA and spatial planning. Our analysis focuses on a case study in Chile, where we administered a questionnaire survey to some of the main actors involved in the spatial planning process. The questionnaire focused on issues such as network relations among actors and on conceptual understanding, perceptions and challenges for integrating ES in SEA and spatial planning, knowledge on methodological approaches, and the connections and gaps in the science-policy interface. Our findings suggest that a common understanding of SEA and especially of ES in a context of multiple actors is still at an initial stage in Chile. Additionally, the lack of institutional guidelines and methodological support is considered the main challenge for integration. We conclude that preconditions exist in Chile for integrating ES in SEA for spatial planning, but they strongly depend on appropriate governance schemes that promote a close science-policy interaction, as well as collaborative work and learning. - Highlights: • Linking ecosystem services in SEA is an effective framework for sustainability. • Multi-actor understanding and networks in ecosystem services and SEA were analyzed. • Understanding of SEA and especially of ES is still in an initial stage in Chile. • A lack of institutional guidelines is one of the key challenges for this link.

  7. Environmental screening tools for assessment of infrastructure plans based on biodiversity preservation and global warming (PEIT, Spain)

    International Nuclear Information System (INIS)

    Garcia-Montero, Luis G.; Lopez, Elena; Monzon, Andres; Otero Pastor, Isabel

    2010-01-01

    Most Strategic Environmental Assessment (SEA) research has been concerned with SEA as a procedure, and there have been relatively few developments and tests of analytical methodologies. The first stage of the SEA is the 'screening', which is the process whereby a decision is taken on whether or not SEA is required for a particular programme or plan. The effectiveness of screening and SEA procedures will depend on how well the assessment fits into the planning from the early stages of the decision-making process. However, it is difficult to prepare the environmental screening for an infrastructure plan involving a whole country. To be useful, such methodologies must be fast and simple. We have developed two screening tools which would make it possible to estimate promptly the overall impact an infrastructure plan might have on biodiversity and global warming for a whole country, in order to generate planning alternatives, and to determine whether or not SEA is required for a particular infrastructure plan.

  8. Integrity assessment plan for PNL 300 area radioactive hazardous waste tank system. Final report

    International Nuclear Information System (INIS)

    1996-03-01

    The Pacific Northwest Laboratory (PNL), operated by Battelle Memorial Institute under contract to the U.S. Department of Energy, operates tank systems for the U.S. Department of Energy, Richland Operations Office (DOE-RL), that contain dangerous waste constituents as defined by Washington State Department of Ecology (WDOE) Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-040(18). Chapter 173-303-640(2) of the WAC requires the performance of integrity assessments for each existing tank system that treats or stores dangerous waste, except those operating under interim status with compliant secondary containment. This Integrity Assessment Plan (IAP) identifies all tasks that will be performed during the integrity assessment of the PNL-operated Radioactive Liquid Waste Systems (RLWS) associated with the 324 and 325 Buildings located in the 300 Area of the Hanford Site. It describes the inspections, tests, and analyses required to assess the integrity of the PNL RLWS (tanks, ancillary equipment, and secondary containment) and provides sufficient information for adequate budgeting and control of the assessment program. It also provides necessary information to permit the Independent, Qualified, Registered Professional Engineer (IQRPE) to approve the integrity assessment program

  9. Integrity assessment plan for PNL 300 area radioactive hazardous waste tank system. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The Pacific Northwest Laboratory (PNL), operated by Battelle Memorial Institute under contract to the U.S. Department of Energy, operates tank systems for the U.S. Department of Energy, Richland Operations Office (DOE-RL), that contain dangerous waste constituents as defined by Washington State Department of Ecology (WDOE) Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-040(18). Chapter 173-303-640(2) of the WAC requires the performance of integrity assessments for each existing tank system that treats or stores dangerous waste, except those operating under interim status with compliant secondary containment. This Integrity Assessment Plan (IAP) identifies all tasks that will be performed during the integrity assessment of the PNL-operated Radioactive Liquid Waste Systems (RLWS) associated with the 324 and 325 Buildings located in the 300 Area of the Hanford Site. It describes the inspections, tests, and analyses required to assess the integrity of the PNL RLWS (tanks, ancillary equipment, and secondary containment) and provides sufficient information for adequate budgeting and control of the assessment program. It also provides necessary information to permit the Independent, Qualified, Registered Professional Engineer (IQRPE) to approve the integrity assessment program.

  10. Work plan for the Oak Ridge Reservation ecological monitoring and assessment program

    International Nuclear Information System (INIS)

    Ashwood, T.L.; Sample, B.E.; Suter, G.W. II; Turner, M.G.; Loar, J.M.; Barnthouse, L.W.

    1994-08-01

    This plan describes an approach for developing an ecological monitoring and assessment program (EMAP) for the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR). Such a program is required to assess existing ecological risks, to predict changes in those ecological risks from proposed remedial actions, and to monitor the effectiveness of remedial actions in reducing ecological risks. Ecological risk assessments must be based on Reservation-level data for those widespread or wide-ranging plant and animal species that occupy the entire ORR. In recognition of this need, Region 4 of the US Environmental Protection Agency has specifically requested that DOE develop a Reservation-wide monitoring and assessment program. The current strategy distinguishes four types of potentially contaminated areas: (1) source operable units (OUs), which may contain waste disposal areas, (2) groundwater aquifers that are potentially contaminated by source OUs, (3) aquatic integrator OUs which are streams and associated floodplains that drain source OUs, and (4) the terrestrial integrator, which encompasses the Reservation. Source OUs may contain sources of contamination that potentially impact local plant and animal population and communities that are restricted to the areal extent of the OU. Such local impacts must be assessed for each OU. However, these source OUs also contribute to risks within the aquatic OUs and within the Reservation-wide terrestrial ecosystem. Therefore, remedial investigations at source OUs must provide data necessary to support ecological risk assessments at the larger scales

  11. Social impact assessment and management methodology using social indicators and planning strategies

    International Nuclear Information System (INIS)

    Olsen, M.E.; Curry, M.G.; Greene, M.R.; Melber, B.D.; Merwin, D.J.

    1978-08-01

    The scope of environmental impact statements prepared during the past few years has steadily expanded to incorporate all aspects of the social as well as the natural environment, including demographic, economic, social, political, and cultural conditions. Broadly conceived, social impacts are alterations in people's living conditions that occur in conjunction with a new policy, program, or project, and that (1) are in addition to all other concurrent changes produced by other factors, and (2) are seen by those affected as significant social events. Since any social environment is constantly changing, the crucial problems in analyzing social impacts are to identify those social alterations that are a direct or indirect result of the specific action under examination, apart from all other events and changes, and to determine which of these alterations are having significant social effects on the people involved. Three features of this conception of social impacts are especially noteworthy. First, although impacts are often thought of as undesirable or detrimental in nature, they may also be desirable or beneficial. Second, although impacts are often described as caused by prior intervening innovations, in reality they always interact with their original causes in a reciprocal process, either immediately or after some time lag. Third, the purpose of social impact assessment is to enable policy makers to anticipate and plan for potential impacts before they occur, and then act to prevent or mitigate undesired impacts. A new methodology for performing social impact assessment and management studies that meet current needs by emphasizing standardized social indicators and social planning techniques is proposed. We refer to our approach as the Social Impact and Planning (SIP) method of social impact assessment

  12. Evaluation of the Assessment Plan for Undergraduate Clerkship in Obstetrics and Gynecology, King Abdulaziz University

    Directory of Open Access Journals (Sweden)

    Ahmad M.S. Almrstani

    2014-01-01

    Full Text Available Background The standards set by accreditation bodies for student assessment during higher education, such as those of the National Commission for Academic Accreditation & Assessment (NCAAA, are necessary in formulating educational programs. These serve as a benchmark for how colleges or universities are assessed and reflect students' learning. Following the implementation of these guidelines, the Department of Obstetrics and Gynaecology, within the Faculty of Medicine in King Abdulaziz University (KAU, established assessment strategies appropriate to their curriculum, which were valid and reliable, thus enabling students to be fairly assessed throughout their undergraduate course. Since KAU is currently preparing for accreditation by the NCAAA, this study was a necessary undertaking to ensure that the assessment strategies designed by the Department of Obstetrics and Gynaecology are aligned and conform to the NCAAA student assessment guidelines, thereby outlining the standard of expected performance and learning outcomes for students. Objectives This study aimed to evaluate the assessment plan of the obstetrics and gynecology clerkship for undergraduate medical students within the Faculty of Medicine, KAU, in comparison to the standard criteria for student assessment as implemented by the NCAAA. Materials and Methods A cross-sectional study was conducted, which employed two questionnaires containing questions based on the NCAAA guidelines. The surveys were distributed among the teaching staff and students rotating for 12 weeks within the Department of Obstetrics and Gynaecology, KAU, from September to November 2013. In total, 100/116 (86.2% students and 26/36 (81.25% teaching staff participated in the study. Results Two sets of results were obtained regarding the student assessment practices in the Department of Obstetrics and Gynaecology, KAU, one from fifth-year medical students and the second from the teaching staff. The results showed that

  13. Guidebook in using Cost Benefit Analysis and strategic environmental assessment for environmental planning in China

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    Environmental planning in China may benefit from greater use of Cost Benefit Analysis (CBA) and Strategic Environmental Assessment (SEA) methodologies. We provide guidance on using these methodologies. Part I and II show the principles behind the methodologies as well as their theoretical structure. Part III demonstrates the methodologies in action in a range of different good practice examples. The case studies and theoretical expositions are intended to teach by way of example as well as by understanding the principles, and to help planners use the methodologies as correctly as possible.(auth)

  14. Fiscal Year 2005 Integrated Monitoring Plan for the Hanford Groundwater Performance Assessment Project

    International Nuclear Information System (INIS)

    Rieger, JoAnne T.; Hartman, Mary J.

    2005-01-01

    Groundwater is monitored in hundreds of wells at the Hanford Site to fulfill a variety of requirements. Separate monitoring plans are prepared for various purposes, but sampling is coordinated and data are shared among users. DOE manages these activities through the Hanford Groundwater Performance Assessment Project, which is the responsibility of Pacific Northwest National Laboratory. The groundwater project integrates monitoring for various objectives into a single sampling schedule to avoid redundancy of effort and to improve efficiency of sample collection.This report documents the purposes and objectives of groundwater monitoring at the DOE Hanford Site in southeastern Washington State

  15. Countywide Evaluation of the Long-Term Family Self-Sufficiency Plan. Assessing the Utility of the LTFSS Plan Service Delivery and Planning Framework

    National Research Council Canada - National Science Library

    Davis, Lois

    2002-01-01

    ...) Plan on November 16,1999. The LTFSS Plan consists of 46 projects whose goal is to promote self-sufficiency among families that are participating in the California Work Opportunity and Responsibility to Kids Act of 1997 (CalWORKS...

  16. Applying comprehensive environmental assessment to research planning for multiwalled carbon nanotubes: Refinements to inform future stakeholder engagement.

    Science.gov (United States)

    Powers, Christina M; Grieger, Khara; Meacham, Connie A; Gooding, Meredith Lassiter; Gift, Jeffrey S; Lehmann, Geniece M; Hendren, Christine O; Davis, J Michael; Burgoon, Lyle

    2016-01-01

    Risk assessments and risk management efforts to protect human health and the environment can benefit from early, coordinated research planning by researchers, risk assessors, and risk managers. However, approaches for engaging these and other stakeholders in research planning have not received much attention in the environmental scientific literature. The Comprehensive Environmental Assessment (CEA) approach under development by the United States Environmental Protection Agency (USEPA) is a means to manage complex information and input from diverse stakeholder perspectives on research planning that will ultimately support environmental and human health decision making. The objectives of this article are to 1) describe the outcomes of applying lessons learned from previous CEA applications to planning research on engineered nanomaterial, multiwalled carbon nanotubes (MWCNTs) and 2) discuss new insights and refinements for future efforts to engage stakeholders in research planning for risk assessment and risk management of environmental issues. Although framed in terms of MWCNTs, this discussion is intended to enhance research planning to support assessments for other environmental issues as well. Key insights for research planning include the potential benefits of 1) ensuring that participants have research, risk assessment, and risk management expertise in addition to diverse disciplinary backgrounds; 2) including an early scoping step before rounds of formal ratings; 3) using a familiar numeric scale (e.g., US dollars) versus ordinal rating scales of "importance"; 4) applying virtual communication tools to supplement face-to-face interaction between participants; and 5) refining criteria to guide development of specific, actionable research questions. © 2015 SETAC.

  17. Assessing, planning, and management of North Sea oil development effects in the Shetland Islands

    International Nuclear Information System (INIS)

    Nelson, J.G.; Butler, R.W.

    1993-01-01

    The Shetland Islands have long had the reputation of having planned and managed the onshore effects of offshore petroleum development very well. The islands are seen as something of a model for others to follow and have frequently been visited since the beginning of northern North Sea oil development in the early 1970s by those wishing to learn how to best approach offshore petroleum development in their home areas. In this assessment the authors wish to focus on views expressed on the effectiveness of the planning and managing of onshore effects of petroleum development and present an overview of interviewee statements on future issues. Emphasis will be placed on the environmental aspects, where that term is taken for present purposes, to include fauna, flora, water quality, and other resources and their relationships to industries such as fishing and tourism--although observations will also be made about planning and management of land use and socio-economic effects. The paper concludes with an attempt to set their findings in a broader pluralist context by relating them to the views expressed in recent books by Shetland residents that contain observations on oil effects although written for more general purposes

  18. Assessment of Land and Water Resource Implications of the UK 2050 Carbon Plan

    Science.gov (United States)

    Konadu, D. D.; Sobral Mourao, Z.; Skelton, S.; Lupton, R.

    2015-12-01

    The UK Carbon Plan presents four low-carbon energy system pathways that achieves 80% GHG emission targets by 2050, stipulated in the UK Climate Change Act (2008). However, some of the energy technologies prescribed under these pathways are land and water intensive; but would the increase demand for land and water under these pathways lead to increased competition and stress on agricultural land, and water resources in the UK? To answer the above question, this study uses an integrated modelling approach, ForeseerTM, which characterises the interdependencies and evaluates the land and water requirement for the pathways, based on scenarios of power plant location, and the energy crop yield projections. The outcome is compared with sustainable limits of resource appropriation to assess potential stresses and competition for water and land by other sectors of the economy. The results show the Carbon Plan pathways have low overall impacts on UK water resources, but agricultural land use and food production could be significantly impacted. The impact on agricultural land use is shown to be mainly driven by projections for transport decarbonisation via indigenously sourced biofuels. On the other hand, the impact on water resources is mainly associated with increased inland thermal electricity generation capacity, which would compete with other industrial and public water demands. The results highlight the need for a critical appraisal of UK's long term low-carbon energy system planning, in particular bioenergy sourcing strategy, and the siting of thermal power generation in order to avert potential resource stress and competition.

  19. Knowing the operative game plan: a novel tool for the assessment of surgical procedural knowledge.

    Science.gov (United States)

    Balayla, Jacques; Bergman, Simon; Ghitulescu, Gabriela; Feldman, Liane S; Fraser, Shannon A

    2012-08-01

    What is the source of inadequate performance in the operating room? Is it a lack of technical skills, poor judgment or a lack of procedural knowledge? We created a surgical procedural knowledge (SPK) assessment tool and evaluated its use. We interviewed medical students, residents and training program staff on SPK assessment tools developed for 3 different common general surgery procedures: inguinal hernia repair with mesh in men, laparoscopic cholecystectomy and right hemicolectomy. The tools were developed as a step-wise assessment of specific surgical procedures based on techniques described in a current surgical text. We compared novice (medical student to postgraduate year [PGY]-2) and expert group (PGY-3 to program staff) scores using the Mann-Whitney U test. We calculated the total SPK score and defined a cut-off score using receiver operating characteristic analysis. In all, 5 participants in 7 different training groups (n = 35) underwent an interview. Median scores for each procedure and overall SPK scores increased with experience. The median SPK for novices was 54.9 (95% confidence interval [CI] 21.6-58.8) compared with 98.05 (95% CP 94.1-100.0) for experts (p = 0.012). The SPK cut-off score of 93.1 discriminates between novice and expert surgeons. Surgical procedural knowledge can reliably be assessed using our SPK assessment tool. It can discriminate between novice and expert surgeons for common general surgical procedures. Future studies are planned to evaluate its use for more complex procedures.

  20. Survivorship care plans: are randomized controlled trials assessing outcomes that are relevant to stakeholders?

    Science.gov (United States)

    Birken, Sarah A; Urquhart, Robin; Munoz-Plaza, Corrine; Zizzi, Alexandra R; Haines, Emily; Stover, Angela; Mayer, Deborah K; Hahn, Erin E

    2018-03-23

    The purpose of this study was to compare outcomes assessed in extant randomized controlled trials (RCTs) to outcomes that stakeholders expect from survivorship care plans (SCPs). To facilitate the transition from active treatment to follow-up care for the 15.5 million US cancer survivors, many organizations require SCP use. However, results of several RCTs of SCPs' effectiveness have been null, possibly because they have evaluated outcomes on which SCPs should be expected to have limited influence. Stakeholders (e.g., survivors, oncologists) may expect outcomes that differ from RCTs' outcomes. We identified RCTs' outcomes using a PubMed literature review. We identified outcomes that stakeholders expect from SCPs using semistructured interviews with stakeholders in three healthcare systems in the USA and Canada. Finally, we mapped RCTs' outcomes onto stakeholder-identified outcomes. RCT outcomes did not fully address outcomes that stakeholders expected from SCPs, and RCTs assessed outcomes that stakeholders did not expect from SCPs. RCTs often assessed outcomes only from survivors' perspectives. RCTs of SCPs' effectiveness have not assessed outcomes that stakeholders expect. To better understand SCPs' effectiveness, future RCTs should assess outcomes of SCP use that are relevant from the perspective of multiple stakeholders. SCPs' effectiveness may be optimized when used with an eye toward outcomes that stakeholders expect from SCPs. For survivors, this means using SCPs as a map to guide them with respect to what kind of follow-up care they should seek, when they should seek it, and from whom they should seek it.

  1. Life cycle assessment as an analytical tool in strategic environmental assessment. Lessons learned from a case study on municipal energy planning in Sweden

    International Nuclear Information System (INIS)

    Björklund, Anna

    2012-01-01

    Life cycle assessment (LCA) is explored as an analytical tool in strategic environmental assessment (SEA), illustrated by case where a previously developed SEA process was applied to municipal energy planning in Sweden. The process integrated decision-making tools for scenario planning, public participation and environmental assessment. This article describes the use of LCA for environmental assessment in this context, with focus on methodology and practical experiences. While LCA provides a systematic framework for the environmental assessment and a wider systems perspective than what is required in SEA, LCA cannot address all aspects of environmental impact required, and therefore needs to be complemented by other tools. The integration of LCA with tools for public participation and scenario planning posed certain methodological challenges, but provided an innovative approach to designing the scope of the environmental assessment and defining and assessing alternatives. - Research highlights: ► LCA was explored as analytical tool in an SEA process of municipal energy planning. ► The process also integrated LCA with scenario planning and public participation. ► Benefits of using LCA were a systematic framework and wider systems perspective. ► Integration of tools required some methodological challenges to be solved. ► This proved an innovative approach to define alternatives and scope of assessment.

  2. Emergency planning and response: An independent safety assessment of Department of Energy nuclear reactor facilities

    International Nuclear Information System (INIS)

    Knuth, D.; Boyd, R.

    1981-02-01

    The Department of Energy (DOE) has formed a Nuclear Facilities Personnel Qualification and Training (NFPQT) Committee to assess the implications of the recommendations contained in the President's Commission Report on the Three Mile Island (TMI) Accident (the Kemeny Commission report) that are applicable to DOE's nuclear reactor operations. Thirteen DOE nuclear reactors have been reviewed. The assessments of the 13 facilities are based on information provided by the individual operator organizations and/or cognizant DOE Field Offices. Additional clarifying information was supplied in some, but not all, instances. This report indicates how these 13 reactor facilities measure up in light of the Kemeny and other TMI-related studies and recommendations, particularly those that have resulted in upgraded Nuclear Regulatory Commission (NRC) requirements in the area of emergency planning and response

  3. Net Zero Energy Military Installations: A Guide to Assessment and Planning

    Energy Technology Data Exchange (ETDEWEB)

    Booth, S.; Barnett, J.; Burman, K.; Hambrick, J.; Westby, R.

    2010-08-01

    The U.S. Department of Defense (DoD) recognizes the strategic importance of energy to its mission, and is working to reduce energy consumption and enhance energy self-sufficiency by drawing on local clean energy sources. A joint initiative formed between DoD and the U.S. Department of Energy (DOE) in 2008 to address military energy use led to a task force to examine the potential for net zero energy military installations, which would produce as much energy on site as they consume in buildings, facilities, and fleet vehicles. This report presents an assessment and planning process to examine military installations for net zero energy potential. Net Zero Energy Installation Assessment (NZEIA) presents a systematic framework to analyze energy projects at installations while balancing other site priorities such as mission, cost, and security.

  4. Groundwater quality assessment plan for the 1324-N/NA Site: Phase 1 (first determination)

    International Nuclear Information System (INIS)

    Hartman, M.J.

    1998-05-01

    The 1324-N Surface Impoundment and 1324-NA Percolation Pond (1324-N/NA Site) are treatment/storage/disposal sites regulated under the Resource Conservation and Recovery Act of 1976 (RCRA). They are located in the 100-N Area of the Hanford Site, and were used to treat and dispose of corrosive waste from a water treatment plant. Groundwater monitoring under an interim-status detection program compared indicator parameters from downgradient wells to background values established from an upgradient well. One of the indicator parameters, total organic carbon (TOC), exceeded its background value in one downgradient well, triggering an upgrade from a detection program to an assessment program. This plan presents the first phase of the assessment program

  5. Suburban landscape assessment applied to urban planning. Case study in Barcelona Metropolitan Region

    Directory of Open Access Journals (Sweden)

    David Serrano Giné

    2015-12-01

    Full Text Available Urban fringes set complex landscapes, in transition from rural to natural and urban, with fuzzy boundaries in mutual interdependence. The European Landscape Convention gives notorious importance to everyday landscapes, including those of suburban character. Few landscape evaluation researches are done in suburban areas, which is surprising considering its importance and abundance. This paper shows a methodology, yield on geographical information systems (GIS, for landscape assessment of suburban areas, useful in urban planning. Its main interest lies in a double assessment, which considers both landscape quality and landscape fragility, applied systematically. The procedure is applied in Muntanyes d’Ordal in the metropolitan area of Barcelona (Spain, an area with pronounced regional strengths and contrasted landscape values. Results are of important applicability and indicate a predominance of mean values, both for landscape quality and landscape fragility.

  6. Assessment of Scheduling and Plan Execution of Apollo 14 Lunar Surface Operations

    Science.gov (United States)

    Marquez, Jessica J.

    2010-01-01

    Although over forty years have passed since first landing on the Moon, there is not yet a comprehensive, quantitative assessment of Apollo extravehicular activities (EVAs). Quantitatively evaluating lunar EVAs will provide a better understanding of the challenges involved with surface operations. This first evaluation of a surface EVA centers on comparing the planned and the as-ran timeline, specifically collecting data on discrepancies between durations that were estimated versus executed. Differences were summarized by task categories in order to gain insight as to the type of surface operation activities that were most challenging. One Apollo 14 EVA was assessed utilizing the described methodology. Selected metrics and task categorizations were effective, and limitations to this process were identified.

  7. Assessing the integration of health center and community emergency preparedness and response planning.

    Science.gov (United States)

    Wineman, Nicole V; Braun, Barbara I; Barbera, Joseph A; Loeb, Jerod M

    2007-11-01

    To assess the state of health center integration into community preparedness, we undertook a national study of linkages between health centers and the emergency preparedness and response planning initiatives in their communities. The key objectives of this project were to gain a better understanding of existing linkages in a nationally representative sample of health centers, and identify health center demographic and experience factors that were associated with strong linkages. The objectives of the study were to gain a baseline understanding of existing health center linkages to community emergency preparedness and response systems and to identify factors that were associated with strong linkages. A 60-item questionnaire was mailed to the population of health centers supported by the Health Resources and Services Administration's Bureau of Primary Health Care in February 2005. Results were aggregated and a chi square analysis identified factors associated with stronger linkages. Overall performance on study-defined indicators of strong linkages was low: 34% had completed a hazard vulnerability analysis in collaboration with the community emergency management agency, 30% had their role documented in the community plan, and 24% participated in community-wide exercises. Stronger linkages were associated with experience responding to a disaster and a perception of high risk for experiencing a disaster. The potential for health centers to participate in an integrated response is not fully realized, and their absence from community-based planning leaves an already vulnerable population at greater risk. Community planners should be encouraged to include health centers in planning and response and centers should receive more targeted resources for community integration.

  8. Evaluation of the probabilistic safety assessment portfolio for NSD. Plan of work

    International Nuclear Information System (INIS)

    Gould, J.

    1999-01-01

    The aim is to use the research portfolio evaluation protocol developed by HSL to evaluate the Probabilistic Safety Assessment (PSA) portfolio, both to draw conclusions about the PSA portfolio and as a pilot study to show the suitability of the evaluation protocol. The objectives of the work are: (1) To collect sufficient information to carry out a preliminary review of the portfolio; (2) o produce a plan of work detailing the time and costs to carry out a full evaluation of the PSA portfolio; (3) to evaluate the PSA portfolio of research; (4) to produce a report of the evaluation of the PSA portfolio; (5) if necessary, to make changes to the methodology in light of the experience gained in the evaluation of the PSA research portfolio. This report completes objectives 1 and 2. It details the plan of work for the evaluation of the PSA research portfolio. The plan has shown that the evaluation of the PSA research portfolio has many difficulties to overcome. It is suitable as a pilot study to show the suitability of the portfolio evaluation protocol and will provide valuable information that can be used to improve it. The evaluation of the PSA portfolio will require a considerable amount of time and effort to complete. The task analysis has shown it to be of the order of Pound Sterling 25k and to take two months to complete after this preliminary data collection. The plan to evaluate the PSA research portfolio detailed in this report should be carried out and the lessons learned by carrying out this pilot study should be used to improve the evaluation protocol

  9. Sustainability principles in strategic environmental assessment: A framework for analysis and examples from Italian urban planning

    Energy Technology Data Exchange (ETDEWEB)

    Lamorgese, Lydia, E-mail: lydial@tin.it; Geneletti, Davide, E-mail: davide.geneletti@unitn.it

    2013-09-15

    This paper presents a framework for analysing the degree of consideration of sustainability principles in Strategic environmental assessment (SEA), and demonstrates its application to a sample of SEA of Italian urban plans. The framework is based on Gibson's (2006) sustainability principles, which are linked to a number of guidance criteria and eventually to review questions, resulting from an extensive literature review. A total of 71 questions are included in the framework, which gives particular emphasis to key concepts, such as intragenerational and intergenerational equity. The framework was applied to review the Environmental Report of the urban plans of 15 major Italian cities. The results of this review show that, even if sustainability is commonly considered as a pivotal concept, there is still work to be done in order to effectively integrate sustainability principles into SEA. In particular, most of the attention is given to mitigation and compensation measures, rather than to actual attempts to propose more sustainable planning decisions in the first place. Concerning the proposed framework of analysis, further research is required to clarify equity concerns and particularly to identify suitable indicators for operationalizing the concepts of intra/inter-generational equity in decision-making. -- Highlights: ► A framework was developed in order to evaluate planning against sustainability criteria. ► The framework was applied to analyse how sustainable principles are addressed in 15 Italian SEA reports. ► Over 85% of the reports addressed, to some extent, at least 40% of the framework questions. ► Criteria explicitly linked to intra and inter-generational equity are rarely addressed.

  10. Human Health and Ecological Risk Assessment Work Plan Mud Pit Release Sites, Amchitka Island, Alaska

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2001-03-12

    This Work Plan describes the approach that will be used to conduct human health and ecological risk assessments for Amchitka Island, Alaska, which was utilized as an underground nuclear test site between 1965 and 1971. During this period, the U.S. Atomic Energy Commission (now the U.S. Department of Energy) conducted two nuclear tests (known as Long Shot and Milrow) and assisted the U.S. Department of Defense with a third test (known as Cannikin). Amchitka Island is approximately 42 miles long and located 1,340 miles west-southwest of Anchorage, Alaska, in the western end of the Aleutian Island archipelago in a group of islands known as the Rat Islands. Historically including deep drilling operations required large volumes of drilling mud, a considerable amount of which was left on the island in exposed mud pits after testing was completed. Therefore, there is a need for drilling mud pit remediation and risk assessment of historical mud pit releases. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the constituents in soil, surface water, and sediment at these former testing sites. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate what further remedial action is required to achieve permanent closure of these three sites that will protect both human health and the environment. Suspected compounds of potential ecological concern for investigative analysis at these sites include diesel-range organics, polyaromatic hydrocarbons, polychlorinated biphenyls, volatile organic compounds, and chromium. The results of these characterizations and risk assessments will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-sit e

  11. A Systematic Review to Uncover a Universal Protocol for Accuracy Assessment of 3-Dimensional Virtually Planned Orthognathic Surgery.

    Science.gov (United States)

    Gaber, Ramy M; Shaheen, Eman; Falter, Bart; Araya, Sebastian; Politis, Constantinus; Swennen, Gwen R J; Jacobs, Reinhilde

    2017-11-01

    The aim of this study was to systematically review methods used for assessing the accuracy of 3-dimensional virtually planned orthognathic surgery in an attempt to reach an objective assessment protocol that could be universally used. A systematic review of the currently available literature, published until September 12, 2016, was conducted using PubMed as the primary search engine. We performed secondary searches using the Cochrane Database, clinical trial registries, Google Scholar, and Embase, as well as a bibliography search. Included articles were required to have stated clearly that 3-dimensional virtual planning was used and accuracy assessment performed, along with validation of the planning and/or assessment method. Descriptive statistics and quality assessment of included articles were performed. The initial search yielded 1,461 studies. Only 7 studies were included in our review. An important variability was found regarding methods used for 1) accuracy assessment of virtually planned orthognathic surgery or 2) validation of the tools used. Included studies were of moderate quality; reviewers' agreement regarding quality was calculated to be 0.5 using the Cohen κ test. On the basis of the findings of this review, it is evident that the literature lacks consensus regarding accuracy assessment. Hence, a protocol is suggested for accuracy assessment of virtually planned orthognathic surgery with the lowest margin of error. Copyright © 2017 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.

  12. Radioactive waste isolation in salt: peer review of the Office of Nuclear Waste Isolation's plans for repository performance assessment

    International Nuclear Information System (INIS)

    Harrison, W.

    1984-05-01

    In the peer review of the preliminary performance assessment plan, suggestions to improve the presentation are given, technical issues are addressed, a page-by-page commentary is included, and recommendations are summarized. In the peer review of the verification and validation plan, the following are addressed: suggestions to improve presentation; key activities that have been overlooked; improving the technical content of the plan; and degree to which code documents support the plan. Comments on other supporting code documents, page-by-page commentary, and summary of recommendations are included

  13. A framework to assess plan implementation maturity with an application to flood management in Vietnam

    NARCIS (Netherlands)

    Phi, Ho Long; Hermans, L.M.; Douven, W.J.A.M.; Halsema, Van G.E.; Khan, Malik Fida

    2015-01-01

    Implementation failure is a long-known Achilles’ heel of water and flood management plans. Contemporary planning approaches address the implementation challenge by using more participatory planning processes to ensure support for plans, assuming that this support will also benefit plan

  14. Should different impact assessment instruments be integrated? Evidence from English spatial planning

    International Nuclear Information System (INIS)

    Tajima, Ryo; Fischer, Thomas B.

    2013-01-01

    This paper aims at providing empirical evidence to the question as to whether integration of different instruments is achieving its aim in supporting sustainable decision making, focusing on SEA inclusive sustainability appraisal (SA) and other impact assessments (IAs) currently used in English spatial planning. Usage of IAs in addition to SA is established and an analysis of the integration approach (in terms of process, output, and assessor) as well as its effectiveness is conducted. It is found that while integration enhances effectiveness to some extent, too much integration, especially in terms of the procedural element, appears to diminish the overall effectiveness of each IA in influencing decisions as they become captured by the balancing function of SA. -- Highlights: ► The usage of different impact assessments in English spatial planning is clarified. ► The relationship between integration approach and effectiveness is analyzed. ► Results suggest that integration does not necessarily lead to more sustainable decisions. ► Careful consideration is recommended upon process integration

  15. Should different impact assessment instruments be integrated? Evidence from English spatial planning

    Energy Technology Data Exchange (ETDEWEB)

    Tajima, Ryo, E-mail: tajima.ryo@nies.go.jp [Interdisciplinary Graduate School of Science and Engineering, Tokyo Institute of Technology, 4259-G5-9 Nagatsuta-cho, Midori-ku, Yokoyama City, Kanagawa, 226-8502 (Japan); Fischer, Thomas B., E-mail: fischer@liverpool.ac.uk [Department of Geography and Planning, School of Environmental Sciences, University of Liverpool, 74 Bedford Street South, Liverpool L69 7ZQ (United Kingdom)

    2013-07-15

    This paper aims at providing empirical evidence to the question as to whether integration of different instruments is achieving its aim in supporting sustainable decision making, focusing on SEA inclusive sustainability appraisal (SA) and other impact assessments (IAs) currently used in English spatial planning. Usage of IAs in addition to SA is established and an analysis of the integration approach (in terms of process, output, and assessor) as well as its effectiveness is conducted. It is found that while integration enhances effectiveness to some extent, too much integration, especially in terms of the procedural element, appears to diminish the overall effectiveness of each IA in influencing decisions as they become captured by the balancing function of SA. -- Highlights: ► The usage of different impact assessments in English spatial planning is clarified. ► The relationship between integration approach and effectiveness is analyzed. ► Results suggest that integration does not necessarily lead to more sustainable decisions. ► Careful consideration is recommended upon process integration.

  16. The use of remote sensing and GIS data in the NW Forest Plan aquatic assessment

    Science.gov (United States)

    Hirsch, C.; Gordon, S. N.; Eldred, P.

    2017-12-01

    The NW Forest Plan is an integrated set of standards and guidelines covering 24 m ac of federal lands on the west side of Washington, Oregon, and northern California. The associated the Aquatic and Riparian Effectiveness Monitoring Program (AREMP) assesses watershed condition and trend on these lands at two levels: upslope/riparian based on GIS and remote sensing data, and inchannel, based on field data collection. AREMP uses a multicriteria evaluation approach similar to WCF, but upslope attributes are restricted to roads and vegetation because these are the only ones which can be reliably backcasted to estimate trend since the start of the Plan in 1994. AREMP has developed a context-sensitive road evaluation system in response to studies showing that a large percentage of road sediment delivery to streams comes from a small percentage of the overall road network, and we are currently testing integration with the GRAIP-lite road sediment tool. AREMP's evaluation of vegetation data, based on Landsat imagery, also uses context derived from the distributions of least-human-disturbed conditions by 16 major forest types. A major question remains in how to evaluate vegetation given the importance of natural disturbances in renewing aquatic habitat. A common challenge across all of our data sources is how to assess uncertainty in data values and locational accuracy.

  17. Assessment of Soil Protection to Support Forest Planning: an Experience in Southern Italy

    Energy Technology Data Exchange (ETDEWEB)

    Ferreti, F.; Cantiani, P.; Meo, I. de; Paletto, A.

    2014-06-01

    Aim of study: To support landscape planning when soil-erosion control and water cycle regulation represent relevant issues for forest management. A methodological approach -based on simplified index- is proposed in order to assess the protective efficacy of forests on soils (indirect protection). This method is aimed at supporting technicians who are requested to define the most suitable management guidelines and silviculture treatments. Area of study: Southern Apennines (Alto Agri district -Basilicata Region- Italy), where a landscape planning experimentation was implemented. Material and methods: The data to estimate the parameters used for the simplified index calculation are retrieved from a non aligned systematic forest inventory. The method considers: 1) the tendency towards instability, 2) the protective action of forest cover and 3) different silviculture options. Main results: For the analysed forest categories, the results indicate the situations in which hydrogeological hazard is high. The cross-reading of these data with the values based on years of partial and total uncovering of the ground according to different silviculture options (for each forest category in the reference period of 100 years) has supported the definition of silviculture treatments and management options suitable for the considered forest formations. Research highlights The proposed method can effectively support technicians in the field by highlighting situations of major hazard risk. Thanks to the joined assessment of different silviculture options for each forest category, a series of silviculture treatments, capable of better protecting the soil, can be already defined in the field survey phase. Key words: Alto Agri district (Italy); Forest Landscape Management Planning (FLMP); management; silviculture treatment; protective function e soil erosion. (Author)

  18. Assessment of Soil Protection to Support Forest Planning: an Experience in Southern Italy

    Directory of Open Access Journals (Sweden)

    Fabrizio Ferretti

    2014-04-01

    Full Text Available Aim of study: to support landscape planning when soil-erosion control and water cycle regulation represent relevant issues for forest management. A methodological approach - based on simplified index – is proposed in order to assess the protective efficacy of forests on soils (indirect protection. This method is aimed at supporting technicians who are requested to define the most suitable management guidelines and silvicultural treatments.Area of study: Southern Apennines (Alto Agri district – Basilicata Region - Italy, where a landscape planning experimentation was implemented. Material and Methods: The data to estimate the parameters used for the simplified index calculation are retrieved from a non aligned systematic forest inventory. The method considers: 1 the tendency towards instability, 2 the protective action of forest cover and 3 different silvicultural options.Main results: For the analysed forest categories, the results indicate the situations in which hydrogeological hazard is high. The cross-reading of these data with the values based on years of partial and total uncovering of the ground according to different silvicultural options (for each forest category in the reference period of 100 years has supported the definition of silviculture treatments and management options suitable for the considered forest formations.Research highlights: The proposed method can effectively support technicians in the field by highlighting situations of major hazard risk. Thanks to the joined assessment of different silvicultural options for each forest category, a series of silvicultural treatments, capable of better protecting the soil, can be already defined in the field survey phase.Key words: Alto Agri district (Italy; Forest Landscape Management Planning (FLMP; management; silvicultural treatment; protective function and soil erosion.

  19. Computerization of radiology departmental management using the personal computer: application in medium sized hospital

    International Nuclear Information System (INIS)

    Ahn, Woo Hyun

    1992-01-01

    The author developed a computer program for use in registration, monthly statistics, printing of reports, data storage and retrieval in the Radiology department. This program has been used in the Department of Radiology, MoonHwa Hospital since November 1990. This program was written in FoxBASE language, consisted of two independent subprograms, one installed in a registration computer without a printer and another in a reporting computer with a printer. The subprograms were designed to link their data by floppy disk. Each computer's hard disk contained permanent files for retrieval and temporary files for data input. All permanent files were indexed on several keywords including the patient's identification data. 1. Registration was performed easily and rapidly. 2. A monthly statistic was obtained simply. 3. Retrieval of the results of previous radiologic studies, printing of report, storage and indexing of data were achieved automatically. This program had merits of simple operation, large storage capacity, rapid retrieval speed, relative low price, easy adjustment for other hospitals. Therefore this program is considered to be an economic substitute for computerization of radiology departmental management in medium sized hospitals

  20. Planning the Unplanned Experiment: Towards Assessing the Efficacy of Standards for Safety-Critical Software

    Science.gov (United States)

    Graydon, Patrick J.; Holloway, C. M.

    2015-01-01

    Safe use of software in safety-critical applications requires well-founded means of determining whether software is fit for such use. While software in industries such as aviation has a good safety record, little is known about whether standards for software in safety-critical applications 'work' (or even what that means). It is often (implicitly) argued that software is fit for safety-critical use because it conforms to an appropriate standard. Without knowing whether a standard works, such reliance is an experiment; without carefully collecting assessment data, that experiment is unplanned. To help plan the experiment, we organized a workshop to develop practical ideas for assessing software safety standards. In this paper, we relate and elaborate on the workshop discussion, which revealed subtle but important study design considerations and practical barriers to collecting appropriate historical data and recruiting appropriate experimental subjects. We discuss assessing standards as written and as applied, several candidate definitions for what it means for a standard to 'work,' and key assessment strategies and study techniques and the pros and cons of each. Finally, we conclude with thoughts about the kinds of research that will be required and how academia, industry, and regulators might collaborate to overcome the noted barriers.

  1. Postclosure performance assessment of the SCP [Site Characterization Plan] conceptual design for horizontal emplacement: Revision 1

    International Nuclear Information System (INIS)

    1987-08-01

    This report is a preliminary postclosure performance assessment of the repository design specified in the Site Characterization Plan Conceptual Design Report (SCP-CDR) for horizontal emplacement of high-level nuclear waste. At the time that these analyses were done, horizontal emplacement was the preferred orientation for the waste packages but vertical emplacement is now the reference design. This assessment consists of (1) a review of the regulatory requirements and strategy to demonstrate compliance with these requirements, (2) an analysis of the performance of the total repository system, (3) an analysis of the thermomechanical behavior of the repository, (4) an analysis of brine mobility in the repository, (5) an analysis of the waste package performance, (6) an analysis of the performance of seals, and (7) comments on the sensitivity of the various performance measures to uncertainties in the data and models. These are preliminary analyses and, in most cases, involve bounding calculations of the repository behavior. They have several purposes including (1) assessing how well this conceptual design ''measures up'' against requirements, (2) gaining experience in implementing the performance assessment strategy and tools and thereby learning where improvements are needed, (3) helping to identify needed data, and (4) helping to indicate required design modifications. 26 refs., 40 figs., 20 tabs

  2. Climate-proof planning for flood-prone areas : assessing the adaptive capacity of planning institutions in the Netherlands

    NARCIS (Netherlands)

    van den Brink, Margo; Meijerink, Sander; Termeer, Catrien; Gupta, Joyeeta

    It is generally acknowledged that adapting low-lying, flood-prone deltas to the projected impacts of climate change is of great importance. Deltas are densely populated and often subject to high risk. Climate-proof planning is, however, not only a new but also a highly complex task that poses

  3. Climate-proof planning for flood-prone areas: assessing the adaptive capacity of planning institutions in the Netherlands

    NARCIS (Netherlands)

    Brink, van den M.A.; Meijerink, S.; Termeer, C.J.A.M.; Gupta, J.

    2014-01-01

    It is generally acknowledged that adapting lowlying, flood-prone deltas to the projected impacts of climate change is of great importance. Deltas are densely populated and often subject to high risk. Climate-proof planning is, however, not only a new but also a highly complex task that poses

  4. Multi-criteria analysis and systemic planning: Towards a tetra-logical approach to planning and assessment

    DEFF Research Database (Denmark)

    Leleur, Steen

    This paper presents systemic planning (SP) with emphasis on multi-criteria decision analysis (MCDA). Specifically, SP is presented as a “tetra-logical” methodology approach with MCDA as one out of four major method orientations. The Danish-Swedish Øresund Fixed Link is used as application example...

  5. Assessing Flood Risks and Planning for Resiliency in New Jersey: A Case Study on the Use of Online Flood Mapping and Resilience Planning Tools

    Science.gov (United States)

    Auermuller, L. M.; Gatto, J.; Huch, C.

    2015-12-01

    The highly developed nature of New Jersey's coastline, barrier island and lagoon communities make them particularly vulnerable to storm surge, sea level rise and flooding. The impacts of Hurricane Sandy have enlightened coastal communities to these realities. Recognizing these vulnerabilities, the Jacques Cousteau National Research Reserve (JC NERR), Rutgers Center for Remote Sensing and Spatial Analysis (CRSSA), Rutgers Bloustein School and the Barnegat Bay Partnership (BBP) have developed web-based tools to assist NJ's coastal communities in visualizing and planning for future local impacts. NJFloodMapper and NJAdapt are two complementary interactive mapping websites that visualize different current and future flood hazards. These hazard layers can be combined with additional data including critical facilities, evacuation routes, socioeconomic and environmental data. Getting to Resilience is an online self-assessment tool developed to assist communities reduce vulnerability and increase preparedness by linking planning, mitigation, and adaptation. Through this interactive process communities will learn how their preparedness can yield valuable points through voluntary programs like FEMA's Community Rating System and Sustainable Jersey. The assessment process can also increase the community's understanding of where future vulnerabilities should be addressed through hazard mitigation planning. Since Superstorm Sandy, more than thirty communities in New Jersey have been provided technical assistance in assessing their risks and vulnerabilities to coastal hazards, and have begun to understand how to better plan and prepare for short and long-term changes along their shorelines.

  6. Spatial decision support for strategic environmental assessment of land use plans. A case study in southern Italy

    International Nuclear Information System (INIS)

    Geneletti, Davide; Bagli, Stefano; Napolitano, Paola; Pistocchi, Alberto

    2007-01-01

    This paper presents and discusses the construction of a spatial decision-support tool for the Strategic Environmental Assessment (SEA) of a land use plan: the spatial coordination plan of the Province of Naples, in southern Italy. The decision-support tool organises the relevant information, spatially resolves the actions of the plan, predicts their environmental impacts, and generates overall performance maps. Its final goal is to provide a suitable technical support to a formal SEA procedure. The expected implications of the plan, such as changes in land use and traffic flows and urban expansion, were modelled and assessed against a set of environmental criteria using SWOT (Strengths, Weaknesses, Opportunities and Threats) analysis and mapping. It was found that the SWOT analysis provided a good basis for assessment and strategy formulation. The paper also intends to contribute to the topic of data and scale issues in SEA, by exemplifying the role played by spatial data and spatial analyses to support informative SEA

  7. The Study of Enhancing Plans on Korean Environmental Conservation Value Assessment Map (ECVAM)

    Science.gov (United States)

    Sung, M.; Choi, Y.; Hwang, J.; Jeon, S. W.

    2016-12-01

    With the limitation of land area in the Republic of Korea, land use and excessive development in Korea is one of the huge socio-environmental problems. Plethora of land owners, government, and enterprises to develop land cover are still struggling for maintaining balance between efficient land utilization and sufficient land conservation. For the feasible management and land use in the future, ECVAM(as known as Environmental Conservation Value Assessment Map) was created, accompanied with objective environmental grading of land in South Korea as well as integrated environmental information. ECVAM is the mapping system expressed by five-graded quality whether to develop or conserve in given land area with different colours. This map was primarily produced as the version 1.0 to ultimately use land eco-friendly and thoroughly which contains legally considered grade factors, environmental and ecological factors since 2001. From 2013, this project has planned to renovate the version 2.0 in more precise methods - strengthening legal support for user expansion, more amplified scale to 1:5,000, and the wide-spread supply such as education for those who demands ECVAM to adjust other fields like Environmental Impact Assessment to cope with land developers. For this year, we framed the official guideline to facilitate governments to design their newly-upgraded ECVAM but also to encourage local governors to utilize this figure for given land assessments. This assessment system also include the theoretical concept called natural asset valuation and the base study plan analyzing Vertical Vegetation Profile in the grading element of Stability of Community Structure. For the further study, it needs to reorganize the assessment factors to make the linkage between the ministry of environment and the ministry of land, infrastructure and transport in Korea for sustainable land use as well as to satisfy the grading ones in other nations' environmental conservation assessments such as

  8. ASSESSING CHEMICAL HAZARDS AT THE PLUTONIUM FINISHING PLANT FOR PLANNING FUTURE DECONTAMINATION AND DECOMMISSIONING

    International Nuclear Information System (INIS)

    HOPKINS, A.M.; KLOS, D.B.; MINETT, M.J.

    2007-01-01

    This paper documents the fiscal year (FY) 2006 assessment to evaluate potential chemical and radiological hazards associated with vessels and piping in the former plutonium process areas at Hanford's Plutonium Finishing Plant (PFP). Evaluations by PFP engineers as design authorities for specific systems and other subject-matter experts were conducted to identify the chemical hazards associated with transitioning the process areas for the long-term layup of PFP before its eventual final decontamination and decommissioning (D and D). D and D activities in the main process facilities were suspended in September 2005 for a period of between 5 and 10 years. A previous assessment conducted in FY 2003 found that certain activities to mitigate chemical hazards could be deferred safely until the D and D of PFP, which had been scheduled to result in a slab-on-grade condition by 2009. As a result of necessary planning changes, however, D and D activities at PFP will be delayed until after the 2009 time frame. Given the extended project and plant life, it was determined that a review of the plant chemical hazards should be conducted. This review to determine the extended life impact of chemicals is called the ''Plutonium Finishing Plant Chemical Hazards Assessment, FY 2006''. This FY 2006 assessment addresses potential chemical and radiological hazard areas identified by facility personnel and subject-matter experts who reevaluated all the chemical systems (items) from the FY 2003 assessment. This paper provides the results of the FY 2006 chemical hazards assessment and describes the methodology used to assign a hazard ranking to the items reviewed

  9. Assessment of therapeutic response and treatment planning for brain tumors using metabolic and physiological MRI.

    Science.gov (United States)

    Nelson, Sarah J

    2011-07-01

    MRI is routinely used for diagnosis, treatment planning and assessment of response to therapy for patients with glioma. Gliomas are spatially heterogeneous and infiltrative lesions that are quite variable in terms of their response to therapy. Patients classified as having low-grade histology have a median overall survival of 7 years or more, but need to be monitored carefully to make sure that their tumor does not upgrade to a more malignant phenotype. Patients with the most aggressive grade IV histology have a median overall survival of 12-15 months and often undergo multiple surgeries and adjuvant therapies in an attempt to control their disease. Despite improvements in the spatial resolution and sensitivity of anatomic images, there remain considerable ambiguities in the interpretation of changes in the size of the gadolinium-enhancing lesion on T(1) -weighted images as a measure of treatment response, and in differentiating between treatment effects and infiltrating tumor within the larger T(2) lesion. The planning of focal therapies, such as surgery, radiation and targeted drug delivery, as well as a more reliable assessment of the response to therapy, would benefit considerably from the integration of metabolic and physiological imaging techniques into routine clinical MR examinations. Advanced methods that have been shown to provide valuable data for patients with glioma are diffusion, perfusion and spectroscopic imaging. Multiparametric examinations that include the acquisition of such data are able to assess tumor cellularity, hypoxia, disruption of normal tissue architecture, changes in vascular density and vessel permeability, in addition to the standard measures of changes in the volume of enhancing and nonenhancing anatomic lesions. This is particularly critical for the interpretation of the results of Phase I and Phase II clinical trials of novel therapies, which are increasingly including agents that are designed to have anti-angiogenic and anti

  10. Multifunctionality assessment in forest planning at landscape level. The study case of Matese Mountain Community (Italy.

    Directory of Open Access Journals (Sweden)

    Umberto Di Salvatore

    2013-12-01

    Full Text Available Normal 0 14 false false false MicrosoftInternetExplorer4 The main objective is to improve a method that aims at evaluating forest multifunctionality from a technical and practical point of view. A methodological approach - based on the index of forest multifunctionality level - is proposed to assess the “fulfilment capability” of a function providing an estimate of performance level of each function in a given forest. This method is aimed at supporting technicians requested to define most suitable management guidelines and silvicultural practices in the framework of a Forest Landscape Management Plan (FLMP. The study area is the Matese district in southern Apennines (Italy, where a landscape planning experimentation was implemented. The approach includes the qualitative and quantitative characterization of selected populations, stratified by forest category by a sampling set of forest inventory plots. A 0.5 ha area around the sample plot was described by filling a form including the following information: site condition, tree species composition, stand origin and structure, silvicultural system, health condition, microhabitats presence. In each sample plot, both the multifunctionality assessment and the estimate of the effect of alternative management options on ecosystem goods and services, were carried out. The introduction of the term “fulfilment capability” and the modification of the concept of priority level - by which the ranking of functions within a plot is evaluated - is an improvement of current analysis method. This enhanced approach allows to detect the current status of forest plot and its potential framed within the whole forest. Assessing functional features of forests with this approach reduces the inherent subjectivity and allows to get useful information on forest multifunctionality to support forest planners in defining management guidelines consistent with current status and potential evolutive pattern.

  11. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: the city of Belgrade.

    Science.gov (United States)

    Josimović, Boško; Marić, Igor; Milijić, Saša

    2015-02-01

    Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results. Copyright © 2014 Elsevier Ltd. All rights reserved.

  12. Performance Assessment Monitoring Plan for the Hanford Site Low-Level Waste Burial Grounds

    International Nuclear Information System (INIS)

    SONNICHSEN, J.C.

    2000-01-01

    As directed by the U.S. Department of Energy (DOE), Richland Operations Office (DOE-RL), Fluor Hanford, Inc. will implement the requirements of DOE Order 435.1, Radioactive Waste Management, as the requirements relate to the continued operation of the low-level waste disposal facilities on the Hanford Site. DOE Order 435.1 requires a disposal authorization statement authorizing operation (or continued operation) of a low-level waste disposal facility. The objective of this Order is to ensure that all DOE radioactive waste is managed in a manner that protects the environment and personnel and public health and safety. The manual (DOE Order 435.1 Manual) implementing the Order states that a disposal authorization statement shall be issued based on a review of the facility's performance assessment and composite analysis or appropriate Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) of 1980 documentation. The disposal authorization shall specify the limits and conditions on construction, design, operations, and closure of the low-level waste facility. Failure to obtain a disposal authorization statement shall result in shutdown of an operational disposal facility. In fulfillment of the requirements of DOE Order 435.1, a disposal authorization statement was issued on October 25, 1999, authorizing the Hanford Site to transfer, receive, possess, and dispose of low-level radioactive waste at the 200 East Area and the 200 West Area Low-Level Burial Grounds. The disposal authorization statement constitutes approval of the performance assessment and composite analysis, authorizes operation of the facility, and includes conditions that the disposal facility must meet. One of the conditions is that monitoring plans for the 200 East Area and 200 West Area Low-Level Burial Grounds be written and approved by the DOE-RL. The monitoring plan is to be updated and implemented within 1 year following issuance of the disposal authorization statement to

  13. Scientific information and the Tongass land management plan: key findings derived from the scientific literature, species assessments, resource analyses, workshops, and risk assessment panels.

    Science.gov (United States)

    Douglas N. Swanston; Charles G. Shaw; Winston P. Smith; Kent R. Julin; Guy A. Cellier; Fred H. Everest

    1996-01-01

    This document highlights key items of information obtained from the published literature and from specific assessments, workshops, resource analyses, and various risk assessment panels conducted as part of the Tongass land management planning process. None of this information dictates any particular decision; however, it is important to consider during decisionmaking...

  14. Implications of sustainability assessment for electricity system design: The case of the Ontario Power Authority's integrated power system plan

    International Nuclear Information System (INIS)

    Winfield, Mark; Gibson, Robert B.; Markvart, Tanya; Gaudreau, Kyrke; Taylor, Jennifer

    2010-01-01

    This paper explores the results and implications of an illustrative application of a sustainability assessment framework in the design and evaluation of a major integrated power system plan. The paper examines the integrated power system plan developed by the Ontario Power Authority in 2007. The basic framework rests on a generic set of evaluation criteria reflecting basic requirements for progress towards sustainability that was adopted, reinterpreted and applied by the Authority in support of its proposed plan. In response to evident deficiencies in the Authority's work, the authors and colleagues undertook a re-examination using a more fully elaborated sustainability assessment framework, specified for application to power system planning. The results point to a plan and plan components substantially different from those proposed by the Authority. More generally, the results highlight three advantages of applying such a sustainability assessment framework: comprehensive coverage of key requirements for progress towards sustainability while ensuring careful attention to the context and concerns of the sector; emphasis on identifying plan options that avoid major trade-offs among the sustainability criteria and recognition of interactions among the social, ecological, economic and technological realms favouring options that offer multiple, mutually reinforcing and lasting benefits.

  15. An independent assessment of the technical feasibility of the Mars One mission plan - Updated analysis

    Science.gov (United States)

    Do, Sydney; Owens, Andrew; Ho, Koki; Schreiner, Samuel; de Weck, Olivier

    2016-03-01

    In recent years, the Mars One program has gained significant publicity for its plans to colonize the red planet. Beginning in 2025, the program plans to land four people on Mars every 26 months via a series of one-way missions, using exclusively existing technology. This one-way approach has frequently been cited as a key enabler of accelerating the first crewed landing on Mars. While the Mars One program has received considerable attention, little has been published in the technical literature regarding the formulation of its mission architecture. In light of this, we perform an independent analysis of the technical feasibility of the Mars One mission plan, focusing on the architecture of the life support and in-situ resource utilization (ISRU) systems, and their impact on sparing and space logistics. To perform this analysis, we adopt an iterative analysis approach in which we model and simulate the mission architecture, assess its feasibility, implement any applicable modifications while attempting to remain within the constraints set forth by Mars One, and then resimulate and reanalyze the revised version of the mission architecture. Where required information regarding the Mars One mission architecture is not available, we assume numerical values derived from standard spaceflight design handbooks and documents. Through four iterations of this process, our analysis finds that the Mars One mission plan, as publicly described, is not feasible. This conclusion is obtained from analyses based on mission assumptions derived from and constrained by statements made by Mars One, and is the result of the following findings: (1) several technologies including ISRU, life support, and entry, descent, and landing (EDL) are not currently "existing, validated and available" as claimed by Mars One; (2) the crop growth area described by Mars One is insufficient to feed their crew; (3) increasing the crop growth area to provide sufficient food for the crew leads to atmospheric

  16. The Assessment of a Tutoring Program to Meet CAS Standards Using a SWOT Analysis and Action Plan

    Science.gov (United States)

    Fullmer, Patricia

    2009-01-01

    This article summarizes the use of SWOT (Strengths, Weaknesses, Opportunities, and Threats) analysis and subsequent action planning as a tool of self-assessment to meet CAS (Council for the Advancement of Standards in Higher Education) requirements for systematic assessment. The use of the evaluation results to devise improvements to increase the…

  17. 4D planning over the full course of fractionation: assessment of the benefit of tumor trailing

    Science.gov (United States)

    McQuaid, D.; Bortfeld, T.

    2011-11-01

    Tumor trailing techniques have been proposed as a method of reducing the problem of intrafraction motion in radiotherapy. However the dosimetric assessment of trailing strategies is complicated by the requirement to study dose deposition over a full fraction delivery. Common 4D planning strategies allowing assessment of dosimetric motion effects study a single cycle acquired with 4DCT. In this paper, a methodology to assess dose deposited over an entire treatment course is advanced and used to assess the potential benefit of tumor trailing strategies for lung cancer patients. Two digital phantoms mimicking patient anatomy were each programmed to follow the tumor respiratory trajectory observed from 33 lung cancer patients. The two phantoms were designed to represent the cases of a small (volume = 13.6 cm3) and large (volume = 181.7 cm3) lung lesion. Motion margins required to obtain CTV coverage by 95% of the prescription dose to 90% of the available cases were computed for a standard treatment strategy and a trailing treatment strategy. The trailing strategy facilitated a margin reduction of over 30% relative to the conventional delivery. When the dose was computed across the entire delivery for the 33 cases, the trailing strategy was found to significantly reduce the underdosage to the outlier cases and the reduced trailing margin facilitated a 15% (small lesion) and 4% (large lesion) reduction for the mean lung dose and 7% (small lesion) and 10% (large lesion) for the mean esophagus dose. Finally, for comparison an ideal continuous tracking strategy was assessed and found to further reduce the mean lung and esophagus dose. However, this improvement comes at the price of increased delivery complexity and increased reliance on tumor localization accuracy.

  18. 4D planning over the full course of fractionation: assessment of the benefit of tumor trailing

    International Nuclear Information System (INIS)

    McQuaid, D; Bortfeld, T

    2011-01-01

    Tumor trailing techniques have been proposed as a method of reducing the problem of intrafraction motion in radiotherapy. However the dosimetric assessment of trailing strategies is complicated by the requirement to study dose deposition over a full fraction delivery. Common 4D planning strategies allowing assessment of dosimetric motion effects study a single cycle acquired with 4DCT. In this paper, a methodology to assess dose deposited over an entire treatment course is advanced and used to assess the potential benefit of tumor trailing strategies for lung cancer patients. Two digital phantoms mimicking patient anatomy were each programmed to follow the tumor respiratory trajectory observed from 33 lung cancer patients. The two phantoms were designed to represent the cases of a small (volume = 13.6 cm 3 ) and large (volume = 181.7 cm 3 ) lung lesion. Motion margins required to obtain CTV coverage by 95% of the prescription dose to 90% of the available cases were computed for a standard treatment strategy and a trailing treatment strategy. The trailing strategy facilitated a margin reduction of over 30% relative to the conventional delivery. When the dose was computed across the entire delivery for the 33 cases, the trailing strategy was found to significantly reduce the underdosage to the outlier cases and the reduced trailing margin facilitated a 15% (small lesion) and 4% (large lesion) reduction for the mean lung dose and 7% (small lesion) and 10% (large lesion) for the mean esophagus dose. Finally, for comparison an ideal continuous tracking strategy was assessed and found to further reduce the mean lung and esophagus dose. However, this improvement comes at the price of increased delivery complexity and increased reliance on tumor localization accuracy.

  19. Quality Assessment of Family Planning Sterilization Services at Health Care Facilities: Case Record Audit.

    Science.gov (United States)

    Mathur, Medha; Goyal, Ram Chandra; Mathur, Navgeet

    2017-05-01

    Quality of sterilization services is a matter of concern in India because population control is a necessity. Family Planning Sterilization (FPS) services provided at public health care facilities need to be as per Standard Operating Procedures. To assess the quality of FPS services by audit of case records at selected health care facilities. This cross-sectional study was conducted for two and a half year duration at selected public health care facilities of central India by simple random sampling where FPS services were provided. As per the standards of Government of India, case records were audited and compliance was calculated to assess the quality of services. Results of record audit were satisfactory but important criteria like previous contraceptive history and postoperative counselling were found to be deviated from standards. At Primary Health Centres (PHCs) only 89.5% and at Community Health Centres (CHCs) 58.7% of records were having details of previous contraceptive history. Other criteria like mental illness (only 70% at CHCs) assessment were also inadequate. Although informed consent was found to be having 100% compliance in all records. Quality of care in FPS services is the matter of concern in present scenario for better quality of services. This study may enlighten the policy makers regarding improvements needed for providing quality care.

  20. Cone-beam computed tomography for planning and assessing surgical outcomes of osteo-odonto-keratoprosthesis.

    Science.gov (United States)

    Berg, Britt-Isabelle; Dagassan-Berndt, Dorothea; Goldblum, David; Kunz, Christoph

    2015-04-01

    The aim of this study was to investigate the feasibility and effectiveness of cone-beam computed tomography (CBCT) in the planning, assessment, and follow-up for osteo-odonto-keratoprosthesis (OOKP). Six OOKP patients received a CBCT scan. CBCT scans were performed before and/or between ∼5 and 504 months after the primary OOKP intervention. Preoperative and postoperative results of the CBCT were assessed, regarding the available teeth and to assess the loss of bone in 1 patient, respectively. Resorption of the osteo-odonto-lamina was measured and graded. Five different measurements (I-V) were performed in the coronal and transversal views of CBCT. Four CBCT scans were performed preoperatively and 4 postoperatively. The follow-up time of the patients is between ∼1 to 528 months. Visualization of the potential donor teeth resulted in accurate 3-dimensional visualization of the tooth-lamina-bone complex. CBCT was found to help in the preoperative decision-making process (diameter of optical implant) and in enabling accurate postoperative evaluation of the bone volume and resorption zones of the OOKP. Loss of bone could be measured in a precise range and showed in the completed cases an average loss of 20.2%. The use of CBCT simplifies the preoperative decision making and ordering process. It also helps in determining the postoperative structure and resorption of the prosthesis.

  1. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects.

    Science.gov (United States)

    Aminbakhsh, Saman; Gunduz, Murat; Sonmez, Rifat

    2013-09-01

    The inherent and unique risks on construction projects quite often present key challenges to contractors. Health and safety risks are among the most significant risks in construction projects since the construction industry is characterized by a relatively high injury and death rate compared to other industries. In construction project management, safety risk assessment is an important step toward identifying potential hazards and evaluating the risks associated with the hazards. Adequate prioritization of safety risks during risk assessment is crucial for planning, budgeting, and management of safety related risks. In this paper, a safety risk assessment framework is presented based on the theory of cost of safety (COS) model and the analytic hierarchy process (AHP). The main contribution of the proposed framework is that it presents a robust method for prioritization of safety risks in construction projects to create a rational budget and to set realistic goals without compromising safety. The framework provides a decision tool for the decision makers to determine the adequate accident/injury prevention investments while considering the funding limits. The proposed safety risk framework is illustrated using a real-life construction project and the advantages and limitations of the framework are discussed. Copyright © 2013 National Safety Council and Elsevier Ltd. All rights reserved.

  2. Assessment of water supply system and water quality of Lighvan village using water safety plan

    Directory of Open Access Journals (Sweden)

    Mojtaba Pourakbar

    2015-12-01

    Full Text Available Background: Continuous expansion of potable water pollution sources is one of the main concerns of water suppliers, therefore measures such as water safety plan (WSP, have been taken into account to control these sources of pollution. The aim of this study was to identify probable risks and threatening hazards to drinking water quality in Lighvan village along with assessment of bank filtration of the village. Methods: In the present study all risks and probable hazards were identified and ranked. For each of these cases, practical suggestions for removing or controlling them were given. To assess potable water quality in Lighvan village, sampling was done from different parts of the village and physicochemical parameters were measured. To assess the efficiency of bank filtration system of the village, independent t test was used to compare average values of parameters in river and treated water. Results: One of the probable sources of pollution in this study was domestic wastewater which threatens water quality. The results of this study show that bank filtration efficiency in water supply of the village is acceptable. Conclusion: Although Bank filtration imposes fewer expenses on governments, it provides suitable water for drinking and other uses. However, it should be noted that application of these systems should be done after a thorough study of water pollution level, types of water pollutants, soil properties of the area, soil percolation and system distance from pollutant sources.

  3. Planning the Unplanned Experiment: Assessing the Efficacy of Standards for Safety Critical Software

    Science.gov (United States)

    Graydon, Patrick J.; Holloway, C. Michael

    2015-01-01

    We need well-founded means of determining whether software is t for use in safety-critical applications. While software in industries such as aviation has an excellent safety record, the fact that software aws have contributed to deaths illustrates the need for justi ably high con dence in software. It is often argued that software is t for safety-critical use because it conforms to a standard for software in safety-critical systems. But little is known about whether such standards `work.' Reliance upon a standard without knowing whether it works is an experiment; without collecting data to assess the standard, this experiment is unplanned. This paper reports on a workshop intended to explore how standards could practicably be assessed. Planning the Unplanned Experiment: Assessing the Ecacy of Standards for Safety Critical Software (AESSCS) was held on 13 May 2014 in conjunction with the European Dependable Computing Conference (EDCC). We summarize and elaborate on the workshop's discussion of the topic, including both the presented positions and the dialogue that ensued.

  4. Combining ecosystem services assessment with structured decision making to support ecological restoration planning.

    Science.gov (United States)

    Martin, David M; Mazzotta, Marisa; Bousquin, Justin

    2018-04-10

    Accounting for ecosystem services in environmental decision making is an emerging research topic. Modern frameworks for ecosystem services assessment emphasize evaluating the social benefits of ecosystems, in terms of who benefits and by how much, to aid in comparing multiple courses of action. Structured methods that use decision analytic-approaches are emerging for the practice of ecological restoration. In this article, we combine ecosystem services assessment with structured decision making to estimate and evaluate measures of the potential benefits of ecological restoration with a case study in the Woonasquatucket River watershed, Rhode Island, USA. We partnered with a local watershed management organization to analyze dozens of candidate wetland restoration sites for their abilities to supply five ecosystem services-flood water retention, scenic landscapes, learning opportunities, recreational opportunities, and birds. We developed 22 benefit indicators related to the ecosystem services as well as indicators for social equity and reliability that benefits will sustain in the future. We applied conceptual modeling and spatial analysis to estimate indicator values for each candidate restoration site. Lastly, we developed a decision support tool to score and aggregate the values for the organization to screen the restoration sites. Results show that restoration sites in urban areas can provide greater social benefits than sites in less urban areas. Our research approach is general and can be used to investigate other restoration planning studies that perform ecosystem services assessment and fit into a decision-making process.

  5. Planning community-based assessments of HIV educational intervention programs in sub-Saharan Africa.

    Science.gov (United States)

    Kelcey, Ben; Shen, Zuchao

    2017-08-01

    A key consideration in planning studies of community-based HIV education programs is identifying a sample size large enough to ensure a reasonable probability of detecting program effects if they exist. Sufficient sample sizes for community- or group-based designs are proportional to the correlation or similarity of individuals within communities. As a result, efficient and effective design requires reasonable a priori estimates of the correlational structure among individuals within communities. In this study, we investigate the degree of correlation among individuals within communities and regions using samples of sixth-grade adolescents from 609 local area district communities and 122 regions in 15 sub-Saharan African nations. We develop nation-specific and international summaries of these correlations using variance partitioning coefficients from multilevel models and subsequently assess the extent to which different types of background variables delineate key sources of these correlations. The results suggest persistent differences among communities and regions and that the degree of correlation among individuals within communities varied considerably by nation. The findings underscore the importance of empirically derived values of design parameters that are anchored in evidence specific to the outcome, nation and context of the planned study. © The Author 2017. Published by Oxford University Press. All rights reserved. For permissions, please email: journals.permissions@oup.com.

  6. Assessment of variability in cerebral vasculature for neuro-anatomical surgery planning in rodent brain

    Science.gov (United States)

    Rangarajan, J. R.; Van Kuyck, K.; Himmelreich, U.; Nuttin, B.; Maes, F.; Suetens, P.

    2011-03-01

    Clinical and pre-clinical studies show that deep brain stimulation (DBS) of targeted brain regions by neurosurgical techniques ameliorate psychiatric disorder such as anorexia nervosa. Neurosurgical interventions in preclinical rodent brain are mostly accomplished manually with a 2D atlas. Considering both the large number of animals subjected to stereotactic surgical experiments and the associated imaging cost, feasibility of sophisticated pre-operative imaging based surgical path planning and/or robotic guidance is limited. Here, we spatially normalize vasculature information and assess the intra-strain variability in cerebral vasculature for a neurosurgery planning. By co-registering and subsequently building a probabilistic vasculature template in a standard space, we evaluate the risk of a user defined electrode trajectory damaging a blood vessel on its path. The use of such a method may not only be confined to DBS therapy in small animals, but also could be readily applicable to a wide range of stereotactic small animal surgeries like targeted injection of contrast agents and cell labeling applications.

  7. Assessment of Family Planning Services at Community Pharmacies in San Diego, California

    Directory of Open Access Journals (Sweden)

    Sally Rafie

    2013-10-01

    Full Text Available Levonorgestrel emergency contraception and other contraceptive methods are available over-the-counter (OTC; however youth continue to face a number of barriers in accessing healthcare services, including lack of knowledge of the method, fear of loss of privacy, difficulties in finding a provider, and cost. A descriptive, nonexperimental, cross-sectional study of a sample of 112 community pharmacies in San Diego, California was conducted between December 2009 and January 2010 to assess community pharmacy practices related to the availability and accessibility of family planning health pharmacy services and products, particularly to youth. A majority (n = 79/112, 70.5% of the pharmacies carried a wide selection of male condoms; however, the other OTC nonhormonal contraceptive products were either not available or available with limited selection. A majority of the pharmacies sold emergency contraception (n = 88/111, 78.6%. Most patient counseling areas consisted of either a public or a semi-private area. A majority of the pharmacy sites did not provide materials or services targeting youth. Significant gaps exist in providing family planning products and services in the majority of community pharmacies in San Diego, California. Education and outreach efforts are needed to promote provision of products and services, particularly to the adolescent population.

  8. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: The city of Belgrade

    International Nuclear Information System (INIS)

    Josimović, Boško; Marić, Igor; Milijić, Saša

    2015-01-01

    Highlights: • The paper deals with the specific method of multi-criteria evaluation applied in drafting the SEA for the Belgrade WMP. • MCE of the planning solutions, assessed according to 37 objectives of the SEA and four sets of criteria, was presented in the matrix form. • The results are presented in the form of graphs so as to be easily comprehensible to all the participants in the decision-making process. • The results represent concrete contribution proven in practice. - Abstract: Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results

  9. Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: The city of Belgrade

    Energy Technology Data Exchange (ETDEWEB)

    Josimović, Boško, E-mail: bosko@iaus.ac.rs; Marić, Igor; Milijić, Saša

    2015-02-15

    Highlights: • The paper deals with the specific method of multi-criteria evaluation applied in drafting the SEA for the Belgrade WMP. • MCE of the planning solutions, assessed according to 37 objectives of the SEA and four sets of criteria, was presented in the matrix form. • The results are presented in the form of graphs so as to be easily comprehensible to all the participants in the decision-making process. • The results represent concrete contribution proven in practice. - Abstract: Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results.

  10. Initiating a Programmatic Assessment Report

    Science.gov (United States)

    Berkaliev, Zaur; Devi, Shavila; Fasshauer, Gregory E.; Hickernell, Fred J.; Kartal, Ozgul; Li, Xiaofan; McCray, Patrick; Whitney, Stephanie; Zawojewski, Judith S.

    2014-01-01

    In the context of a department of applied mathematics, a program assessment was conducted to assess the departmental goal of enabling undergraduate students to recognize, appreciate, and apply the power of computational tools in solving mathematical problems that cannot be solved by hand, or would require extensive and tedious hand computation. A…

  11. Visual Assessment on Coastal Cruise Tourism: A Preliminary Planning Using Importance Performance Analysis

    Science.gov (United States)

    Trisutomo, S.

    2017-07-01

    Importance-Performance Analysis (IPA) has been widely applied in many cases. In this research, IPA was applied to measure perceive on coastal tourism objects and its possibility to be developed as coastal cruise tourism in Makassar. Three objects, i.e. Akkarena recreational site, Losari public space at waterfront, and Paotere traditional Phinisi ships port, were selected and assessed visually from water area by a group of purposive resource persons. The importance and performance of 10 attributes of each site were scored using Likert scale from 1 to 5. Data were processed by SPSS-21 than resulted Cartesian graph which the scores were divided in four quadrants: Quadrant I concentric here, Quadrant II keep up the good work, Quadrant III low priority, and Quadrant IV possible overkill. The attributes in each quadrant could be considered as the platform for preliminary planning of coastal cruise tour in Makassar

  12. From local development policies to strategic planning-Assessing continuity in institutional coalitions.

    Science.gov (United States)

    Mazzeo Rinaldi, Francesco

    2016-06-01

    In the last two decades, EU policies have had a fundamental role in orienting regional/local development. The objective of this work is set in this context as it intends to analyze the local development programs activated in Sicily in the last three programming periods. The main aim is to explore whether the EU partnership principle influenced cooperation among local actors, assessing the continuity of local institutional coalition in managing different local development programs within the regional development policy system. We focus, in particular, on Strategic Plans (SP) promoted in Sicily in the transition phase between the 2000-2006 and the 2007-2013 periods. Copyright © 2016 Elsevier Ltd. All rights reserved.

  13. Establishing Sustainable Nuclear Education: Education Capability Assessment and Planning (ECAP) Assist Mission

    International Nuclear Information System (INIS)

    Ugbor, U.; Peddicord, K.; Dies, J.; Philip, B.; Artisyuk, V.

    2016-01-01

    Full text: The development of nuclear education, science and technology programmes is affected by the national context including national needs and capacities. The role and expectations for nuclear education and training might be different in technically matured countries, from countries where the technology is emerging. In this regard, particularly in developing countries, there is a need to balance nuclear education and training between immediate critical issues of radiation safety or human health and longer-term priorities in agriculture or industry. These priorities may or may not include the nuclear energy option. This paper shows how the Education Capability Assessment and Planning (ECAP) Assist Mission can contribute towards establishing sustainable nuclear education, including highlighting the various activities of each phase of the ECAP Process. (author

  14. Risk assessment for enterprise resource planning (ERP) system implementations: a fault tree analysis approach

    Science.gov (United States)

    Zeng, Yajun; Skibniewski, Miroslaw J.

    2013-08-01

    Enterprise resource planning (ERP) system implementations are often characterised with large capital outlay, long implementation duration, and high risk of failure. In order to avoid ERP implementation failure and realise the benefits of the system, sound risk management is the key. This paper proposes a probabilistic risk assessment approach for ERP system implementation projects based on fault tree analysis, which models the relationship between ERP system components and specific risk factors. Unlike traditional risk management approaches that have been mostly focused on meeting project budget and schedule objectives, the proposed approach intends to address the risks that may cause ERP system usage failure. The approach can be used to identify the root causes of ERP system implementation usage failure and quantify the impact of critical component failures or critical risk events in the implementation process.

  15. Assessment of In-Cloud Enterprise Resource Planning System Performed in a Virtual Cluster

    Directory of Open Access Journals (Sweden)

    Bao Rong Chang

    2015-01-01

    Full Text Available This paper introduces a high-performed high-availability in-cloud enterprise resources planning (in-cloud ERP which has deployed in the virtual machine cluster. The proposed approach can resolve the crucial problems of ERP failure due to unexpected downtime and failover between physical hosts in enterprises, causing operation termination and hence data loss. Besides, the proposed one together with the access control authentication and network security is capable of preventing intrusion hacked and/or malicious attack via internet. Regarding system assessment, cost-performance (C-P ratio, a remarkable cost effectiveness evaluation, has been applied to several remarkable ERP systems. As a result, C-P ratio evaluated from the experiments shows that the proposed approach outperforms two well-known benchmark ERP systems, namely, in-house ECC 6.0 and in-cloud ByDesign.

  16. Extinction risk assessment for the species survival plan (SSP) population of the Bali mynah (Leucopsar rothschildi).

    Science.gov (United States)

    Earnhardt, Joanne M; Thompson, Steven D; Faust, Lisa J

    2009-05-01

    The Bali mynah Species Survival Plan (SSP), an Association of Zoos and Aquariums program, strives to maintain the genetic and demographic health of its population, avoid unplanned changes in size, and minimize the risk of population extinction. The SSP population meets current demographic and genetic objectives with a population size of 209 birds at 61 institutions and 96% genetic diversity (GD) retained from the source population. However, participating institutions have expressed concerns regarding space allocation, target population size (TPS), breeding restrictions, inbreeding depression, and harvest in relation to future population availability and viability. Based on these factors, we assess five questions with a quantitative risk assessment, specifically a population viability analysis (PVA) using ZooRisk software. Using an individual-based stochastic model, we project potential population changes under different conditions (e.g. changes in TPS and genetic management) to identify the most effective management actions. Our projections indicate that under current management conditions, population decline and extinction are unlikely and that although GD will decline over 100 years the projected loss does not exceed levels acceptable to population managers (less than 90% GD retained). Model simulations indicate that the combination of two genetic management strategies (i.e. priority breeding based on mean kinship and inbreeding avoidance) benefits the retention of GD and reduces the accumulation of inbreeding. The current TPS (250) is greater than necessary to minimize the risk of extinction for the SSP population but any reduction in TPS must be accompanied by continued application of genetic management. If carefully planned, birds can be harvested for transfer to Bali for a reintroduction program without jeopardizing the SSP population.

  17. MRI-based measurements of respiratory motion variability and assessment of imaging strategies for radiotherapy planning

    International Nuclear Information System (INIS)

    Blackall, J M; Ahmad, S; Miquel, M E; McClelland, J R; Landau, D B; Hawkes, D J

    2006-01-01

    Respiratory organ motion has a significant impact on the planning and delivery of radiotherapy (RT) treatment for lung cancer. Currently widespread techniques, such as 4D-computed tomography (4DCT), cannot be used to measure variability of this motion from one cycle to the next. In this paper, we describe the use of fast magnetic resonance imaging (MRI) techniques to investigate the intra- and inter-cycle reproducibility of respiratory motion and also to estimate the level of errors that may be introduced into treatment delivery by using various breath-hold imaging strategies during lung RT planning. A reference model of respiratory motion is formed to enable comparison of different breathing cycles at any arbitrary position in the respiratory cycle. This is constructed by using free-breathing images from the inhale phase of a single breathing cycle, then co-registering the images, and thereby tracking landmarks. This reference model is then compared to alternative models constructed from images acquired during the exhale phase of the same cycle and the inhale phase of a subsequent cycle, to assess intra- and inter-cycle variability ('hysteresis' and 'reproducibility') of organ motion. The reference model is also compared to a series of models formed from breath-hold data at exhale and inhale. Evaluation of these models is carried out on data from ten healthy volunteers and five lung cancer patients. Free-breathing models show good levels of intra- and inter-cycle reproducibility across the tidal breathing range. Mean intra-cycle errors in the position of organ surface landmarks of 1.5(1.4)-3.5(3.3) mm for volunteers and 2.8(1.8)-5.2(5.2) mm for patients. Equivalent measures of inter-cycle variability across this range are 1.7(1.0)-3.9(3.3) mm for volunteers and 2.8(1.8)-3.3(2.2) mm for patients. As expected, models based on breath-hold sequences do not represent normal tidal motion as well as those based on free-breathing data, with mean errors of 4

  18. A GIS-based human health risk assessment for urban green space planning--an example from Grugliasco (Italy).

    Science.gov (United States)

    Poggio, Laura; Vrscaj, Borut

    2009-11-15

    The need to develop approaches for risk-based management of soil contamination, as well as the integration of the assessment of the human health risk (HHR) due to the soil contamination in the urban planning procedures has been the subject of recent attention of scientific literature and policy makers. The spatial analysis of environmental data offers multiple advantages for studying soil contamination and HHR assessment, facilitating the decision making process. The aim of this study was to explore the possibilities and benefits of spatial implementation of a quantitative HHR assessment methodology for a planning case in a typical urban environment where the soil is contaminated. The study area is located in the city of Grugliasco a part of the Turin (Italy) metropolitan area. The soils data were derived from a site specific soil survey and the land-use data from secondary sources. In the first step the soil contamination data were geo-statistically analysed and a spatial soil contamination data risk modelling procedure designed. In order to spatially assess the HHR computer routines were developed using GIS raster tools. The risk was evaluated for several different land uses for the planned naturalistic park area. The HHR assessment indicated that the contamination of soils with heavy metals in the area is not sufficient to induce considerable health problems due to typical human behaviour within the variety of urban land uses. An exception is the possibility of direct ingestion of contaminated soil which commonly occurs in playgrounds. The HHR evaluation in a planning case in the Grugliasco Municipality confirms the suitability of the selected planning option. The construction of the naturalistic park presents one solution for reducing the impacts of soil contamination on the health of citizens. The spatial HHR evaluation using GIS techniques is a diagnostic procedure for assessing the impacts of urban soil contamination, with which one can verify planning

  19. Urban and Transport Planning Related Exposures and Mortality: A Health Impact Assessment for Cities.

    Science.gov (United States)

    Mueller, Natalie; Rojas-Rueda, David; Basagaña, Xavier; Cirach, Marta; Cole-Hunter, Tom; Dadvand, Payam; Donaire-Gonzalez, David; Foraster, Maria; Gascon, Mireia; Martinez, David; Tonne, Cathryn; Triguero-Mas, Margarita; Valentín, Antònia; Nieuwenhuijsen, Mark

    2017-01-01

    By 2050, nearly 70% of the global population is projected to live in urban areas. Because the environments we inhabit affect our health, urban and transport designs that promote healthy living are needed. We estimated the number of premature deaths preventable under compliance with international exposure recommendations for physical activity (PA), air pollution, noise, heat, and access to green spaces. We developed and applied the Urban and TranspOrt Planning Health Impact Assessment (UTOPHIA) tool to Barcelona, Spain. Exposure estimates and mortality data were available for 1,357,361 residents. We compared recommended with current exposure levels. We quantified the associations between exposures and mortality and calculated population attributable fractions to estimate the number of premature deaths preventable. We also modeled life-expectancy and economic impacts. We estimated that annually, nearly 20% of mortality could be prevented if international recommendations for performance of PA; exposure to air pollution, noise, and heat; and access to green space were followed. Estimations showed that the greatest portion of preventable deaths was attributable to increases in PA, followed by reductions of exposure to air pollution, traffic noise, and heat. Access to green spaces had smaller effects on mortality. Compliance was estimated to increase the average life expectancy by 360 (95% CI: 219, 493) days and result in economic savings of 9.3 (95% CI: 4.9, 13.2) billion EUR/year. PA factors and environmental exposures can be modified by changes in urban and transport planning. We emphasize the need for a) the reduction of motorized traffic through the promotion of active and public transport and b) the provision of green infrastructure, both of which are suggested to provide opportunities for PA and for mitigation of air pollution, noise, and heat. Citation: Mueller N, Rojas-Rueda D, Basagaña X, Cirach M, Cole-Hunter T, Dadvand P, Donaire-Gonzalez D, Foraster M

  20. Key skills by design: adapting a central Web resource to departmental contexts

    Directory of Open Access Journals (Sweden)

    Claire McAvinia

    2002-12-01

    Full Text Available Web-based delivery of support materials for students has proved to be a popular way of helping small teams to implement key skills policies within universities. The development of 'key' or 'transferable' skills is now encouraged throughout education, but resources (both in terms of staffing and budget tend to be limited. It is difficult for key skills teams to see learners face to face, and not feasible to print or distribute large amounts of paper-based material. Web-based delivery presents a means of overcoming these problems but it can result in generic study skills material simply being published online without due consideration of the needs of different groups of learners within different subject disciplines. Therefore, although a centralized Website for skills provision can overcome logistical problems, it may be perceived as irrelevant or unusable by the student population. This paper presents a model for Web-based delivery of support for key skills which incorporates two separate approaches to the design of these resources. The model was implemented as part of a wider key skills pilot project at University College London, over a period of one year. It includes a 'core' Website, containing information and resources for staff and students. These can also be accessed via customized, departmental key skills homepages. This paper presents the basis for the design choices made in preparing these materials, and the evaluation of some of the pilot departments using them. It then draws some wider conclusions about the effectiveness of this design for supporting skills development.

  1. Best Practices in Physics Program Assessment: Should APS Provide Accreditation Standards for Physics?

    Science.gov (United States)

    Hodapp, Theodore

    The Phys21 report, ``Preparing Physics Students for 21st Century Careers,'' provides guidance for physics programs to improve their degree programs to make them more relevant for student career choices. Undertaking such changes and assessing impact varies widely by institution, with many departments inventing assessments with each periodic departmental or programmatic review. American Physical Society has embarked on a process to integrate information from Phys21, the results of other national studies, and educational research outcomes to generate a best-practices guide to help physics departments conduct program review, assessment, and improvement. It is anticipated that departments will be able to use this document to help with their role in university-level accreditation, and in making the case for improvements to departmental programs. Accreditation of physics programs could stem from such a document, and I will discuss some of the thinking of the APS Committee on Education in creating this guide, and how they are advising APS to move forward in the higher education landscape that is increasingly subject to standards-based evaluations. I will describe plans for the design, review, and dissemination of this guide, and how faculty can provide input into its development. This material is based upon work supported by the National Science Foundation under Grant No. 1540570. Opinions expressed do not necessarily reflect those of the NSF.

  2. Assessment of I-125 seed implant accuracy when using the live-planning technique for low dose rate prostate brachytherapy

    Directory of Open Access Journals (Sweden)

    Moorrees Joshua

    2012-11-01

    Full Text Available Abstract Background Low risk prostate cancers are commonly treated with low dose rate (LDR brachytherapy involving I-125 seeds. The implementation of a ‘live-planning’ technique at the Royal Adelaide Hospital (RAH in 2007 enabled the completion of the whole procedure (i.e. scanning, planning and implant in one sitting. ‘Live-planning’ has the advantage of a more reliable delivery of the planned treatment compared to the ‘traditional pre-plan’ technique (where patient is scanned and planned in the weeks prior to implant. During live planning, the actual implanted needle positions are updated real-time on the treatment planning system and the dosimetry is automatically recalculated. The aim of this investigation was to assess the differences and clinical relevance between the planned dosimetry and the updated real-time implant dosimetry. Methods A number of 162 patients were included in this dosimetric study. A paired t-test was performed on the D90, V100, V150 and V200 target parameters and the differences between the planned and implanted dose distributions were analysed. Similarly, dosimetric differences for the organs at risk (OAR were also evaluated. Results Small differences between the primary dosimetric parameters for the target were found. Still, the incidence of hotspots was increased with approximately 20% for V200. Statistically significant increases were observed in the doses delivered to the OAR between the planned and implanted data; however, these increases were consistently below 3% thus probably without clinical consequences. Conclusions The current study assessed the accuracy of prostate implants with I-125 seeds when compared to initial plans. The results confirmed the precision of the implant technique which RAH has in place. Nevertheless, geographical misses, anatomical restrictions and needle displacements during implant can have repercussions for centres without live-planning option if dosimetric changes are not

  3. What are community nurses experiences of assessing frailty and assisting in planning subsequent interventions?

    Science.gov (United States)

    Britton, Hannah

    2017-09-02

    With an ageing population and increasing focus on community care, this study aimed to explore the experiences of community nurses in assessing frailty and planning interventions around frailty. Six community nurses were recruited for face-to-face semi-structured interviews as part of this qualitative study which was underpinned by a competence framework ( Royal College of Nursing, 2009 ). Thematic analysis was used and frailty was identified as an emerging topic within practice. Participants discussed several aspects associated with frailty; however, some uncertainty around the concept of frailty and its definition was noted, particularly for staff who had received limited frailty training. Participants had a growing awareness of frailty in practice, but challenges-including time constraints and staffing within some roles, a perception of limited services to support older people, and for some a lack of confidence and training-presented barriers to frailty assessment. The Rockwood frailty scale was used by participants within practice, but evidence suggested it was felt to lack validity within the community setting.

  4. FY 1996 annual work plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  5. International Space Station (ISS) Plasma Contactor Unit (PCU) Utilization Plan Assessment Update

    Science.gov (United States)

    Hernandez-Pellerano, Amri; Iannello, Christopher J.; Garrett, Henry B.; Ging, Andrew T.; Katz, Ira; Keith, R. Lloyd; Minow, Joseph I.; Willis, Emily M.; Schneider, Todd A.; Whittlesey, Edward J.; hide

    2014-01-01

    The International Space Station (ISS) vehicle undergoes spacecraft charging as it interacts with Earth's ionosphere and magnetic field. The interaction can result in a large potential difference developing between the ISS metal chassis and the local ionosphere plasma environment. If an astronaut conducting extravehicular activities (EVA) is exposed to the potential difference, then a possible electrical shock hazard arises. The control of this hazard was addressed by a number of documents within the ISS Program (ISSP) including Catastrophic Safety Hazard for Astronauts on EVA (ISS-EVA-312-4A_revE). The safety hazard identified the risk for an astronaut to experience an electrical shock in the event an arc was generated on an extravehicular mobility unit (EMU) surface. A catastrophic safety hazard, by the ISS requirements, necessitates mitigation by a two-fault tolerant system of hazard controls. Traditionally, the plasma contactor units (PCUs) on the ISS have been used to limit the charging and serve as a "ground strap" between the ISS structure and the surrounding ionospheric plasma. In 2009, a previous NASA Engineering and Safety Center (NESC) team evaluated the PCU utilization plan (NESC Request #07-054-E) with the objective to assess whether leaving PCUs off during non-EVA time periods presented risk to the ISS through assembly completion. For this study, in situ measurements of ISS charging, covering the installation of three of the four photovoltaic arrays, and laboratory testing results provided key data to underpin the assessment. The conclusion stated, "there appears to be no significant risk of damage to critical equipment nor excessive ISS thermal coating damage as a result of eliminating PCU operations during non- EVA times." In 2013, the ISSP was presented with recommendations from Boeing Space Environments for the "Conditional" Marginalization of Plasma Hazard. These recommendations include a plan that would keep the PCUs off during EVAs when the

  6. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment. Volume 1, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  7. Public Fishing Plan and Environmental Assessment Prime Hook National Wildlife Refuge 1986

    Data.gov (United States)

    Department of the Interior — A new fishing plan has been prepared to update the refuge’s public fishing program and to provide a legal framework for refuge fishing. This plan is combined with an...

  8. 77 FR 22761 - Draft Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Science.gov (United States)

    2012-04-17

    ... War ironclad, USS Monitor, best known for its battle with the Confederate ironclad, CSS Virginia in... plan is comprised of eight action plans (education and outreach; research and monitoring; resource...

  9. Integration of health into urban spatial planning through impact assessment: Identifying governance and policy barriers and facilitators

    International Nuclear Information System (INIS)

    Carmichael, Laurence; Barton, Hugh; Gray, Selena; Lease, Helen; Pilkington, Paul

    2012-01-01

    This article presents the results of a review of literature examining the barriers and facilitators in integrating health in spatial planning at the local, mainly urban level, through appraisals. Our literature review covered the UK and non UK experiences of appraisals used to consider health issues in the planning process. We were able to identify four main categories of obstacles and facilitators including first the different knowledge and conceptual understanding of health by different actors/stakeholders, second the types of governance arrangements, in particular partnerships, in place and the political context, third the way institutions work, the responsibilities they have and their capacity and resources and fourth the timeliness, comprehensiveness and inclusiveness of the appraisal process. The findings allowed us to draw some lessons on the governance and policy framework regarding the integration of health impact into spatial planning, in particular considering the pros and cons of integrating health impact assessment (HIA) into other forms of impact assessment of spatial planning decisions such as environmental impact assessment (EIA) and strategic environment assessment (SEA). In addition, the research uncovered a gap in the literature that tends to focus on the mainly voluntary HIA to assess health outcomes of planning decisions and neglect the analysis of regulatory mechanisms such as EIA and SEA. - Highlights: ► Governance and policy barriers and facilitators to the integration of health into urban planning. ► Review of literature on impact assessment methods used across the world. ► Knowledge, partnerships, management/resources and processes can impede integration. ► HIA evaluations prevail uncovering research opportunities for evaluating other techniques.

  10. The Climate Resilience Toolkit: Central gateway for risk assessment and resilience planning at all governance scales

    Science.gov (United States)

    Herring, D.; Lipschultz, F.

    2016-12-01

    As people and organizations grapple with a changing climate amid a range of other factors simultaneously shifting, there is a need for credible, legitimate & salient scientific information in useful formats. In addition, an assessment framework is needed to guide the process of planning and implementing projects that allow communities and businesses to adapt to specific changing conditions, while also building overall resilience to future change. We will discuss how the U.S. Climate Resilience Toolkit (CRT) can improve people's ability to understand and manage their climate-related risks and opportunities, and help them make their communities and businesses more resilient. In close coordination with the U.S. Climate Data Initiative, the CRT is continually evolving to offer actionable authoritative information, relevant tools, and subject matter expertise from across the U.S. federal government in one easy-to-use location. The Toolkit's "Climate Explorer" is designed to help people understand potential climate conditions over the course of this century. It offers easy access to downloadable maps, graphs, and data tables of observed and projected temperature, precipitation and other decision-relevant climate variables dating back to 1950 and out to 2100. Since climate is only one of many changing factors affecting decisions about the future, it also ties climate information to a wide range of relevant variables to help users explore vulnerabilities and impacts. New topic areas have been added, such as "Fisheries," "Regions," and "Built Environment" sections that feature case studies and personal experiences in making adaptation decisions. A curated "Reports" section is integrated with semantic web capabilities to help users locate the most relevant information sources. As part of the USGCRP's sustained assessment process, the CRT is aligning with other federal activities, such as the upcoming 4th National Climate Assessment.

  11. Berlengas Biosphere Reserve - Plan for the assessment of ecosystem services and functions

    Directory of Open Access Journals (Sweden)

    Sergio Miguel Leandro

    2014-05-01

    Full Text Available The project Berlengas Biosphere Reserve - Plan for the Assessment of Ecosystem Services and Functions arises from the need to identify and assess ecosystem services, promoting sustainable uses of the services in the Reserve. The high degradation rate currently observed in the natural systems, thus reducing the level and quality of ecosystem services, is reflected in a negative effect on environmental quality, human well-being and in some economic activities. Thus, it becomes inevitable to promote the need to convey the importance of these services to society. It is also essential to contribute to the development of innovative and environmentally sustainable practices which will maintain the functioning of the local ecosystem and the sustainability of the services. Thus, the main goals of this project are i to identify and analyse the impacts and dependencies on ecosystem services in the Reserve; ii to analyse the trends of the priority services, iii to identify the risks and opportunities associated with these services; iv to evaluate their value and ultimately iv to disseminate the results improving conservation and management. Based on the results to be obtained through the evaluation and maintenance of these services it is expected an improvement on the environment in the region and the development of efficient mechanisms for the management of resources. Started in February 2014, over the past 3 months much research has already been conducted, with emphasis for the identification of services and opportunities in the Reserve. Ecosystem services in Berlengas can range from simply providing essential goods or support (e.g. fish to cultural services (e.g. field trips, diving. Work is also being done to develop, define and optimize the methods to assess ecosystems services trends and values.

  12. Quantification of uncertainty in flood risk assessment for flood protection planning: a Bayesian approach

    Science.gov (United States)

    Dittes, Beatrice; Špačková, Olga; Ebrahimian, Negin; Kaiser, Maria; Rieger, Wolfgang; Disse, Markus; Straub, Daniel

    2017-04-01

    Flood risk estimates are subject to significant uncertainties, e.g. due to limited records of historic flood events, uncertainty in flood modeling, uncertain impact of climate change or uncertainty in the exposure and loss estimates. In traditional design of flood protection systems, these uncertainties are typically just accounted for implicitly, based on engineering judgment. In the AdaptRisk project, we develop a fully quantitative framework for planning of flood protection systems under current and future uncertainties using quantitative pre-posterior Bayesian decision analysis. In this contribution, we focus on the quantification of the uncertainties and study their relative influence on the flood risk estimate and on the planning of flood protection systems. The following uncertainty components are included using a Bayesian approach: 1) inherent and statistical (i.e. limited record length) uncertainty; 2) climate uncertainty that can be learned from an ensemble of GCM-RCM models; 3) estimates of climate uncertainty components not covered in 2), such as bias correction, incomplete ensemble, local specifics not captured by the GCM-RCM models; 4) uncertainty in the inundation modelling; 5) uncertainty in damage estimation. We also investigate how these uncertainties are possibly reduced in the future when new evidence - such as new climate models, observed extreme events, and socio-economic data - becomes available. Finally, we look into how this new evidence influences the risk assessment and effectivity of flood protection systems. We demonstrate our methodology for a pre-alpine catchment in southern Germany: the Mangfall catchment in Bavaria that includes the city of Rosenheim, which suffered significant losses during the 2013 flood event.

  13. Work plan for conducting an ecological risk assessment at J-Field, Aberdeen Proving Ground, Maryland

    Energy Technology Data Exchange (ETDEWEB)

    Hlohowskyj, I.; Hayse, J.; Kuperman, R. [Argonne National Lab., IL (United States). Environmental Assessment Div.] [and others

    1995-03-01

    The Environmental Management Division of Aberdeen Proving Ground (APG), Maryland, is conducting a remedial investigation and feasibility study (RI/FS) of the J-Field area at APG pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. J-Field is within the Edgewood Area of APG in Harford County, Maryland, and activities at the Edgewood Area since World War II have included the development, manufacture, testing, and destruction of chemical agents and munitions. The J-Field site was used to destroy chemical agents and munitions by open burning and open detonation. This work plan presents the approach proposed to conduct an ecological risk assessment (ERA) as part of the RI/FS program at J-Field. This work plan identifies the locations and types of field studies proposed for each area of concern (AOC), the laboratory studies proposed to evaluate toxicity of media, and the methodology to be used in estimating doses to ecological receptors and discusses the approach that will be used to estimate and evaluate ecological risks at J-Field. Eight AOCs have been identified at J-Field, and the proposed ERA is designed to evaluate the potential for adverse impacts to ecological receptors from contaminated media at each AOC, as well as over the entire J-Field site. The proposed ERA approach consists of three major phases, incorporating field and laboratory studies as well as modeling. Phase 1 includes biotic surveys of the aquatic and terrestrial habitats, biological tissue sampling and analysis, and media toxicity testing at each AOC and appropriate reference locations. Phase 2 includes definitive toxicity testing of media from areas of known or suspected contamination or of media for which the Phase 1 results indicate toxicity or adverse ecological effects. In Phase 3, the uptake models initially developed in Phase 2 will be finalized, and contaminant dose to each receptor from all complete pathways will be estimated.

  14. Relation of Environmental Impact Assessment (EIA and Strategic Environmental Assessment (SEA and the Importance of Strategic Environmental Assessment in Landscape Planning Process

    Directory of Open Access Journals (Sweden)

    Gizem CENGİZ GÖKÇE

    2015-07-01

    Full Text Available The main goal in the countries which have not completed their development progress is industrialization and development just as soon as possible. Therefore, negative effects of industrialization and development on envi ronment and/or nature cannot be mostly discussed adequately. One of the planning approach instruments that targets sustainability, Environmental Impact Assessment (EIA is used in many countries effectively. But in recent years, that has understood; EIA is an impact assessment instrument that contains defensive preventions only on the basis of projects and this situation has caused some concerns against EIA. In this direction, Strategical Environmental Assessment (SEA exists as the final point of the instruments which are formed to provide sustainable development . In this study; the importance and the requirement of effectively taking a role of landscape architectures that have ecological based job, in the SEA workings which isn’t have got a legal status in Turkey yet, are emphasized by reviewing the relations between EIA and SEA concepts.

  15. Development Plans and Life Plans: Knowledge Sharing?

    Directory of Open Access Journals (Sweden)

    Juan José Vieco Albarracín

    2010-02-01

    Full Text Available This article explores the possibilities of establishing knowledge sharing between governmental development plans and the “life plans” (planes de vida made by indigenous organizations, in particular the life plan of the Asociación de Autoridades Indígenas del Resguardo Tikuna, Cocama, Yagua (Aticoya, municipality of Puerto Nariño, Amazonas, Colombia. Colombia’s Constitution of 1991 created the ETI (Entidad Territorial Indígena,“indigenous territorial entity” as a territorial unit, just like municipalities, departments, and districts. This means that indigenous reservations (or “reserves” or “preserves” and associations should manage public funds, for which they must design a life plan. This inclusion and recognition of indigenous peoples entails that those life plans should articulate with the municipal, departmental, and national development plans. The article illustrates this situation by comparing two welfare programs –Resa (Red de Seguridad Alimentaria “Food Security Network” and Familias Guardabosques (“Forest Ranger Families”– and two income-generating productive and service (tourism projects carried out by Aticoya and the local indigenous councils of communities on the Amazon and Loretoyacu Rivers.

  16. Health impacts related to urban and transport planning: A burden of disease assessment.

    Science.gov (United States)

    Mueller, Natalie; Rojas-Rueda, David; Basagaña, Xavier; Cirach, Marta; Cole-Hunter, Tom; Dadvand, Payam; Donaire-Gonzalez, David; Foraster, Maria; Gascon, Mireia; Martinez, David; Tonne, Cathryn; Triguero-Mas, Margarita; Valentín, Antònia; Nieuwenhuijsen, Mark

    2017-10-01

    Until now, estimates of the Global Burden of Disease (GBD) have mainly been produced on national or regional levels. These general estimates, however, are less useful for city governments who have to take decisions on local scales. To address this gap, we focused on the city-level burden of disease (BD) due to exposures affected by urban and transport planning. We conducted a BD assessment using the Urban and Transport Planning Health Impact Assessment (UTOPHIA) tool to estimate annual preventable morbidity and disability-adjusted life-years (DALYs) under compliance with international exposure recommendations for physical activity (PA), exposure to air pollution, noise, heat, and access to green spaces in Barcelona, Spain. Exposure estimates and morbidity data were available for 1,357,361 Barcelona residents ≥20years (2012). We compared recommended with current exposure levels to estimate the associated BD. We quantified associations between exposures and morbidities and calculated population attributable fractions to estimate the number of attributable cases. We calculated DALYs using GBD Study 2015 background DALY estimates for Spain, which were scaled to Barcelona considering differences in population size, age and sex structures. We also estimated annual health costs that could be avoided under compliance with exposure recommendations. Not complying with recommended levels for PA, air pollution, noise, heat and access to green spaces was estimated to generate a large morbidity burden and resulted in 52,001 DALYs (95% CI: 42,866-61,136) in Barcelona each year (13% of all annual DALYs). From this BD 36% (i.e. 18,951 DALYs) was due to traffic noise with sleep disturbance and annoyance contributing largely (i.e. 10,548 DALYs). Non-compliance was estimated to result in direct health costs of 20.10 million € (95% CI: 15.36-24.83) annually. Non-compliance of international exposure recommendations was estimated to result in a considerable BD and in substantial

  17. Quality-of-life assessment of family planning adopters through user perspectives in the district of Karimnagar

    Directory of Open Access Journals (Sweden)

    Kameswararao Avasarala

    2009-01-01

    Full Text Available Background: Small families adopting family planning are usually considered happy families. They are expected to lead a better qualitative life. Quality-of-life (QOL is routinely assessed for knowing patients′ health status. Recently, the QOL concept has become increasingly popular for evaluating the impact of public health interventions. Hitherto, QOL is usually assessed by means of program achievements or indicators, which may sometimes be misleading. Hence, the new culture of QOL assessment by means of user perspectives is now becoming popular. Research Questions: 1 Is the quality-of-life of family planning (FP adopters better than that of non-FP adopters? 2 Are the user perspectives helpful in QOL assessment? Materials and Methods: A cross-sectional descriptive study was carried out among 50 FP adopting families and 50 non-FP adopting families from the village of Vutoor and the city of Karimnagar in Andhra Pradesh. Sampling Methods: Random sampling, Proportions and Chi square test. Results: Program perspectives revealed a better standard of living for FP adopters because they have amenities like housing, television, and vehicles and less mortality and morbidity ( P < 0.001. However, they lack positive feelings towards life, general adaptation, personal relationships, and leisure opportunities. Finally, self-assessment by FP adopters themselves revealed no significant increase in their qualitative life after family planning ( P = 0.05. Conclusions: While assessing the impact of a health program on quality-of-life, multiple methods of assessments including user perspectives are better than program indicators alone.

  18. Viability Assessment of a Repository at Yucca Mountain. Volume 4: License Application Plan and Costs

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-12-01

    Volume 4 provides the DOE plan and cost estimate for the remaining work necessary to proceed from completing this VA to submitting an LA to NRC. This work includes preparing an EIS and evaluating the suitability of the site. Both items are necessary components of the documentation required to support a decision in 2001 by the Secretary of Energy on whether or not to recommend that the President approve the site for development as a repository. If the President recommends the site to Congress and the site designation becomes effective, then DOE will submit the LA to NRC in 2002 for authorization to construct the repository. The work described in Volume 4 constitutes the last step in the characterization of the Yucca Mountain site and the design and evaluation of the performance of a repository system in the geologic setting of this site. The plans in this volume for the next 4 years' work are based on the results of the previous 15 years' work, as reported in Volumes 1, 2, and 3 of this VA. Volume 1 summarizes what DOE has learned to date about the Yucca Mountain site. Volume 2 describes the current, reference repository design, several design options that might enhance the performance of the reference design, and several alternative designs that represent substantial departures from the reference design. Volume 2 also summarizes the results of tests of candidate materials for waste packages and for support of the tunnels into which waste would be emplaced. Volume 3 provides the results of the latest performance assessments undertaken to evaluate the performance of the design in the geologic setting of Yucca Mountain. The results described in Volumes 1, 2, and 3 provide the basis for identifying and prioritizing the work described in this volume. DOE believes that the planned work, together with the results of previous work, will be sufficient to support a site suitability evaluation for site recommendation and, if the site is recommended and designated, a

  19. Status assessment and conservation plan for the yellow-billed loon (Gavia adamsii)

    Science.gov (United States)

    Earnst, Susan L.

    2004-01-01

    Because of its restricted range, small population size, specific habitat requirements, and perceived threats to its breeding habitat, the Yellow-billed Loon (Gavia adamsii) is a species of conservation concern to the U.S. Fish and Wildlife Service and the subject of a petition for listing under the Endangered Species Act. This Status Assessment synthesizes current information on population size, trends, and potential threats to Yellow-billed Loons, and the Conservation Plan identifies research and monitoring activities that would contribute to the conservation of this species. The preparation of this report was requested and funded by the U.S. Fish and Wildlife Service, Nongame Bird Office, Region 7.The Status Assessment and Conservation Plan for the Yellow-billed Loon can be summarized as follows:? Northern Alaska breeding grounds support an average of 3,369 individuals, including change), but interpretation of surveys is complicated by changes in observers and high annual variation, and the 95% confidence interval is large (-3.6% to +1.8% annual change). The low reproductive potential of Yellow-billed Loons suggests that recovery from a substantial decline would not occur rapidly. There are no systematic surveys of Canadian and Russian breeding populations (Section 6-F).? The expansion of the oil industry into prime Yellow-billed Loon breeding habitat is a recent occurrence and we lack the necessary information to accurately predict its effect on the population. Most of northern Alaska?s Yellow-billed Loons (91%) occur on the National Petroleum Reserve?Alaska, virtually all of which is open or proposed to be opened to development and where there is no permanent or legal protection of Yellow-billed Loon habitat (Section 7-A).? Other potential factors affecting the population are also addressed, such as contaminants, subsistence hunting, by catch in subsistence and commercial fisheries on the breeding and wintering grounds, and health of the marine ecosystem off

  20. Energy Portfolio Assessment Tool (EPAT): Sustainable Energy Planning Using the WEF Nexus Approach - Texas Case Study

    Science.gov (United States)

    Mroue, A. M.

    2017-12-01

    The future energy portfolio at the national and subnational levels should consider its impact on water resources and environment. Although energy resources are the main contributors to the national economic growth, these resources must not exploit other primary natural resources. A study of the connections between energy and natural systems, such as water, environment and land is required prior to proceeding to energy development. Policy makers are in need of a tool quantifying the interlinkages across energy, water and the environment, while demonstrating the consequent trade-offs across the nexus systems. The Energy Portfolio Assessment Tool (EPAT) is a tool that enables the policy maker to create different energy portfolio scenarios with various energy and electricity sources, and evaluate the scenario's sustainability environmentally and economically. The Water-Energy-Food nexus systematic approach is the foundation of the EPAT framework. The research evaluates the impact of the current and projected Texas energy portfolios on water and the environment, taking into consideration energy production, electricity generation and policy change. The three scenarios to be assessed include EIA projections for energy production, and EIA projections for electricity generation with and without the Clean Power Plan (CPP). Each scenario is accompanied by tradeoffs across water, land, emissions, energy revenue and electricity cost. The CPP succeeds in mitigating the emissions of the electricity portfolio, but leads to an increase in water consumption and land use. The cost of electricity generation is almost identical with and without environmental conservation. Revenue from energy production increased, but results are majorly influenced by commodity price. Therefore, conservation policies should move from the silo to the nexus mentality to avoid unintended consequences as improving one part of the nexus could end up worsening the other parts.

  1. Resource utilization after introduction of a standardized clinical assessment and management plan.

    Science.gov (United States)

    Friedman, Kevin G; Rathod, Rahul H; Farias, Michael; Graham, Dionne; Powell, Andrew J; Fulton, David R; Newburger, Jane W; Colan, Steven D; Jenkins, Kathy J; Lock, James E

    2010-01-01

    A Standardized Clinical Assessment and Management Plan (SCAMP) is a novel quality improvement initiative that standardizes the assessment and management of all patients who carry a predefined diagnosis. Based on periodic review of systemically collected data the SCAMP is designed to be modified to improve its own algorithm. One of the objectives of a SCAMP is to identify and reduce resource utilization and patient care costs. We retrospectively reviewed resource utilization in the first 93 arterial switch operation (ASO) SCAMP patients and 186 age-matched control ASO patients. We compared diagnostic and laboratory testing obtained at the initial SCAMP clinic visit and control patient visits. To evaluate the effect of the SCAMP over time, the number of clinic visits per patient year and echocardiograms per patient year in historical control ASO patients were compared to the projected rates for ASO SCAMP participants. Cardiac magnetic resonance imaging (MRI), stress echocardiogram, and lipid profile utilization were higher in the initial SCAMP clinic visit group than in age-matched control patients. Total echocardiogram and lung scan usage were similar. Chest X-ray and exercise stress testing were obtained less in SCAMP patients. ASO SCAMP patients are projected to have 0.5 clinic visits and 0.5 echocardiograms per year. Historical control patients had more clinic visits (1.2 vs. 0.5 visits/patient year, P<.01) and a higher echocardiogram rate (0.92 vs. 0.5 echocardiograms/patient year, P<.01) Implementation of a SCAMP may initially lead to increased resource utilization, but over time resource utilization is projected to decrease.

  2. Assembly Line Productivity Assessment by Comparing Optimization-Simulation Algorithms of Trajectory Planning for Industrial Robots

    Directory of Open Access Journals (Sweden)

    Francisco Rubio

    2015-01-01

    Full Text Available In this paper an analysis of productivity will be carried out from the resolution of the problem of trajectory planning of industrial robots. The analysis entails economic considerations, thus overcoming some limitations of the existing literature. Two methodologies based on optimization-simulation procedures are compared to calculate the time needed to perform an industrial robot task. The simulation methodology relies on the use of robotics and automation software called GRASP. The optimization methodology developed in this work is based on the kinematics and the dynamics of industrial robots. It allows us to pose a multiobjective optimization problem to assess the trade-offs between the economic variables by means of the Pareto fronts. The comparison is carried out for different examples and from a multidisciplinary point of view, thus, to determine the impact of using each method. Results have shown the opportunity costs of non using the methodology with optimized time trajectories. Furthermore, it allows companies to stay competitive because of the quick adaptation to rapidly changing markets.

  3. Benefits of family planning: an assessment of women's knowledge in rural Western Kenya.

    Science.gov (United States)

    Mutombo, Namuunda; Bakibinga, Pauline; Mukiira, Carol; Kamande, Eva

    2014-03-18

    The last two decades have seen an increase in literature reporting an increase in knowledge and use of contraceptives among individuals and couples in Kenya, as in the rest of Africa, but there is a dearth of information regarding knowledge about benefits of family planning (FP) in Kenya. To assess the factors associated with knowledge about the benefits of FP for women and children, among women in rural Western Kenya. Data are drawn from the Packard Western Kenya Project Baseline Survey, which collected data from rural women (aged 15-49 years). Ordinal regression was used on 923 women to determine levels of knowledge and associated factors regarding benefits of FP. Women in rural Western Kenya have low levels of knowledge about benefits of FP and are more knowledgeable about benefits for the mother rather than for the child. Only age, spousal communication and type of contraceptive method used are significant. Women's level of knowledge about benefits of FP is quite low and may be one of the reasons why fertility is still high in Western Kenya. Therefore, FP programmes need to focus on increasing women's knowledge about the benefits of FP in this region.

  4. Identification and assessment of site treatment plan implementation opportunities for emerging technologies

    International Nuclear Information System (INIS)

    Bernard, E.A.

    1995-01-01

    The Department of Energy (DOE), in response to the 1992 Federal Facility Compliance Act, has prepared Site Treatment Plans (STP) for the approximately 2,000 waste streams identified within its mixed waste inventory Concurrently, emerging mixed waste treatment technologies are in final development. This paper defines a three-phase process to identify and assess implementation opportunities for these emerging technologies within the STP. It highlights the first phase, functional matching of expected treatment capabilities with proposed treatment requirements. Matches are based on treatment type, regulated contaminant and waste matrix type, for both capabilities and requirements. Results identify specific waste streams and volumes that could be treated by each emerging technology. A study for Plasma Hearth Process, Delphi DETOX sm , Supercritical Water Oxidation and Vitrification shows that about 200,000 ml of DOE's mixed waste inventory can potentially be treated by one or more of these emerging technologies. Actual implementations are small fractions of the treatable inventory. Differences between potential and actual implementations must be minimized to accrue optimum benefit from implementation of emerging or alternative treatment technologies. Functional matching is the first phase in identifying and quantifying benefits, addressing technology system and treatment issues, and providing, in part, the basis for STP implementation decisions. DOE, through EM's Office of Technology Development, has funded this work

  5. Resource reduction in pediatric chest pain: Standardized clinical assessment and management plan.

    Science.gov (United States)

    Saleeb, Susan F; McLaughlin, Sarah R; Graham, Dionne A; Friedman, Kevin G; Fulton, David R

    2018-01-01

    Using a Standardized Clinical Assessment and Management Plan (SCAMP) for pediatric patients presenting to clinic with chest pain, we evaluated the cost impact associated with implementation of the care algorithm. Prior to introduction of the SCAMP, we analyzed charges for 406 patients with chest pain, seen in 2009, and predicted 21% reduction of overall charges had the SCAMP methodology been used. The SCAMP recommended an echocardiogram for history, examination, or ECG findings suggestive of a cardiac etiology for chest pain. Resource utilization was reviewed for 1517 patients (7-21 years) enrolled in the SCAMP from July 2010 to April 2014. Compared to the 2009 historic cohort, patients evaluated by the SCAMP had higher rates of exertional chest pain (45% vs 37%) and positive family history (5% vs 1%). The SCAMP cohort had fewer abnormal physical examination findings (1% vs 6%) and abnormal electrocardiograms (3% vs 5%). Echocardiogram use increased in the SCAMP cohort compared to the 2009 historic cohort (45% vs 41%), whereas all other ancillary testing was reduced: exercise stress testing (4% SCAMP vs 28% historic), Holter (4% vs 7%), event monitors (3% vs 10%), and MRI (1% vs 2%). Total charges were reduced by 22% ($822 625) by use of the Chest Pain SCAMP, despite a higher percentage of patients for whom echocardiogram was recommended compared to the historic cohort. The Chest Pain SCAMP effectively streamlines cardiac testing and reduces resource utilization. Further reductions can be made by algorithm refinement regarding echocardiograms for exertional symptoms. © 2017 Wiley Periodicals, Inc.

  6. Using contingent choice methods to assess consumer preferences about health plan design.

    Science.gov (United States)

    Marquis, M Susan; Buntin, Melinda Beeuwkes; Kapur, Kanika; Yegian, Jill M

    2005-01-01

    American insurers are designing products to contain health care costs by making consumers financially responsible for their choices. Little is known about how consumers will view these new designs. Our objective is to examine consumer preferences for selected benefit designs. We used the contingent choice method to assess willingness to pay for six health plan attributes. Our sample included subscribers to individual health insurance products in California, US. We used fitted logistic regression models to explore how preferences for the more generous attributes varied with the additional premium and with the characteristics of the subscriber. High quality was the most highly valued attribute based on the amounts consumers report they are willing to pay. They were also willing to pay substantial monthly premiums to reduce their overall financial risk. Individuals in lower health were willing to pay more to reduce their financial risk than individuals in better health. Consumers may prefer tiered-benefit designs to those that involve overall increases in cost sharing. More consumer information is needed to help consumers better evaluate the costs and benefits of their insurance choices.

  7. Natural resource assessment: an approach to science based planning in national parks

    Science.gov (United States)

    Mahan, C.G.; Vanderhorst, J.P.; Young, J.A.

    2009-01-01

    We conducted a natural resource assessment at two national parks, New River Gorge National River and Shenandoah National Park, to help meet the goals of the Natural Resource Challenge-a program to help strengthen natural resource management at national parks. We met this challenge by synthesizing and interpreting natural resource information for planning purposes and we identified information gaps and natural significance of resources. We identified a variety of natural resources at both parks as being globally and/or nationally significant, including large expanses of unfragmented, mixed-mesophytic forests that qualify for wilderness protection, rare plant communities, diverse assemblages of neotropical migratory birds and salamanders, and outstanding aquatic recreational resources. In addition, these parks function, in part, as ecological reserves for plants in and wildlife. With these significant natural resources in mind, we also developed a suite of natural resource management recommendations in light of increasing threats from within and outside park boundaries. We hope that our approach can provide a blueprint for natural resource conservation at publically owned lands.

  8. Identification and assessment of site treatment plan implementation opportunities for emerging technologies

    Energy Technology Data Exchange (ETDEWEB)

    Bernard, E.A. [Sandia National Labs., Germantown, MD (United States)

    1995-12-31

    The Department of Energy (DOE), in response to the 1992 Federal Facility Compliance Act, has prepared Site Treatment Plans (STP) for the approximately 2,000 waste streams identified within its mixed waste inventory Concurrently, emerging mixed waste treatment technologies are in final development. This paper defines a three-phase process to identify and assess implementation opportunities for these emerging technologies within the STP. It highlights the first phase, functional matching of expected treatment capabilities with proposed treatment requirements. Matches are based on treatment type, regulated contaminant and waste matrix type, for both capabilities and requirements. Results identify specific waste streams and volumes that could be treated by each emerging technology. A study for Plasma Hearth Process, Delphi DETOX{sup sm}, Supercritical Water Oxidation and Vitrification shows that about 200,000 ml of DOE`s mixed waste inventory can potentially be treated by one or more of these emerging technologies. Actual implementations are small fractions of the treatable inventory. Differences between potential and actual implementations must be minimized to accrue optimum benefit from implementation of emerging or alternative treatment technologies. Functional matching is the first phase in identifying and quantifying benefits, addressing technology system and treatment issues, and providing, in part, the basis for STP implementation decisions. DOE, through EM`s Office of Technology Development, has funded this work.

  9. Ordinary risks and accepted fictions: how contrasting and competing priorities work in risk assessment and mental health care planning.

    Science.gov (United States)

    Coffey, Michael; Cohen, Rachel; Faulkner, Alison; Hannigan, Ben; Simpson, Alan; Barlow, Sally

    2017-06-01

    Communication and information sharing are considered crucial to recovery-focused mental health services. Effective mental health care planning and coordination includes assessment and management of risk and safety. Using data from our cross-national mixed-method study of care planning and coordination, we examined what patients, family members and workers say about risk assessment and management and explored the contents of care plans. Thematic analysis of qualitative research interviews (n = 117) with patients, family members and workers, across four English and two Welsh National Health Service sites. Care plans were reviewed (n = 33) using a structured template. Participants have contrasting priorities in relation to risk. Patients see benefit in discussions about risk, but cast the process as a worker priority that may lead to loss of liberty. Relationships with workers are key to family members and patients; however, worker claims of involving people in the care planning process do not extend to risk assessment and management procedures for fear of causing upset. Workers locate risk as coming from the person rather than social or environmental factors, are risk averse and appear to prioritize the procedural aspects of assessment. Despite limitations, risk assessment is treated as legitimate work by professionals. Risk assessment practice operates as a type of fiction in which poor predictive ability and fear of consequences are accepted in the interests of normative certainty by all parties. As a consequence, risk adverse options are encouraged by workers and patients steered away from opportunities for ordinary risks thereby hindering the mobilization of their strengths and abilities. © 2016 The Authors. Health Expectations Published by John Wiley & Sons Ltd.

  10. Attitudes of Special Education Teachers and School Psychologists toward Individualized Education Plan IEPs Developed Using Traditional Assessments versus IEPs Developed Using a Multiple Intelligence Assessment

    Science.gov (United States)

    Alhajri, Meshari A SH A.

    2011-01-01

    The purpose of this research was to determine the usefulness of Multiple Intelligence for educational planning for students in special education. More specifically, this study applied the Multiple Intelligences Developmental Assessment Scales (MIDAS) to a sample of students receiving special education services who had IEPs developed using…

  11. Comparative assessment of national bioenergy strategies and biomass action plans in 12 EU countries. European Best Practice Report. Extended version

    International Nuclear Information System (INIS)

    2009-01-01

    This report is a key output of the EU project 'BAP Driver', an initiative of energy agencies from 8 European key bioenergy nations and the European Biomass Association (AEBIOM). The BAP Driver project aims at identifying ways for improvement of current national policy frameworks for bioenergy in Europe, and at leveraging the process of developing country-specific Biomass Action Plans (BAP). From a strategic perspective, the general approach of this report focuses on four stages, required for setting up national biomass strategies and action plans: Assessment of national biomass resources; Formulation of national bioenergy strategies and biomass action plans; Implementation of national bioenergy policies; Monitoring of national bioenergy markets and policies. Overall the analysis is split into three chapters corresponding to the following logical steps: Chapter B: Country analysis (12 individual country profiles); Chapter C: Benchmark analysis (comparative assessment of 12 countries); Chapter D: Best practice analysis (transnational conclusions across national boundaries)

  12. Comparative assessment of national bioenergy strategies and biomass action plans in 12 EU countries. European Best Practice Report. Executive Summary

    International Nuclear Information System (INIS)

    2009-01-01

    This report is a key output of the EU project 'BAP Driver', an initiative of energy agencies from 8 European key bioenergy nations and the European Biomass Association (AEBIOM). The BAP Driver project aims at identifying ways for improvement of current national policy frameworks for bioenergy in Europe, and at leveraging the process of developing country-specific Biomass Action Plans (BAP). From a strategic perspective, the general approach of this report focuses on four stages, required for setting up national biomass strategies and action plans: Assessment of national biomass resources; Formulation of national bioenergy strategies and biomass action plans; Implementation of national bioenergy policies; Monitoring of national bioenergy markets and policies. Overall the analysis is split into three chapters corresponding to the following logical steps: Chapter B: Country analysis (12 individual country profiles); Chapter C: Benchmark analysis (comparative assessment of 12 countries); Chapter D: Best practice analysis (transnational conclusions across national boundaries)

  13. 76 FR 62055 - Wabash Gas Storage, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Science.gov (United States)

    2011-10-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF11-6-000] Wabash Gas Storage, LLC; Notice of Intent To Prepare an Environmental Assessment for the Planned Wabash Gas Storage Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory Commission ...

  14. 78 FR 79688 - Paiute Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Science.gov (United States)

    2013-12-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF14-4-000] Paiute Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned 2015 Elko Area Expansion Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory...

  15. 76 FR 54758 - Alliance Pipeline L.P.; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Science.gov (United States)

    2011-09-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF11-7-000] Alliance Pipeline L.P.; Notice of Intent To Prepare an Environmental Assessment for the Planned Tioga Lateral Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory Commission (FERC or...

  16. 75 FR 26220 - Notice of Intent to Prepare an Environmental Assessment for the Planned Leader One Gas Storage...

    Science.gov (United States)

    2010-05-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Leader One Energy, LLC] Notice of Intent to Prepare an Environmental Assessment for the Planned Leader One Gas Storage Project, Request for Comments on Environmental Issues, and Notice of a Site Visit April 30, 2010. The staff of the Federal Energy Regulatory Commission (FERC or...

  17. 75 FR 56089 - Equitrans, L.P.; Notice of Intent To Prepare an Environmental Assessment for the Planned Sunrise...

    Science.gov (United States)

    2010-09-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF10-19-000] Equitrans, L.P.; Notice of Intent To Prepare an Environmental Assessment for the Planned Sunrise Pipeline Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting September 3, 2010. The staff of the Federal Energy Regulatory...

  18. 77 FR 37032 - Questar Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Science.gov (United States)

    2012-06-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF12-14-000] Questar Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the Planned JL 47 Loop Project, Request for Comments on Environmental Issues, and Notice of Onsite Review The staff of the Federal Energy Regulatory Commission (FERC or Commissio...

  19. 75 FR 19641 - Empire Pipeline, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Planned...

    Science.gov (United States)

    2010-04-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF10-5-000] Empire Pipeline, Inc.; Notice of Intent To Prepare an Environmental Assessment for the Planned Tioga County Extension Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting April 7, 2010. The staff of the Federal Energy...

  20. A social assessment of urban parkland: Analyzing park use and meaning to inform management and resilience planning

    Science.gov (United States)

    Lindsay K. Campbell; Erika S. Svendsen; Nancy Falxa Sonti; Michelle L. Johnson

    2016-01-01

    Globally, municipalities are tackling climate adaptation and resilience planning. Urban green space has crucial biophysical buffering capacities, but also affects social interactions and human well-being. This paper considers the social dimension of urban green space, through an assessment focused on park use, function, and meanings, and compares results to categories...

  1. 76 FR 58509 - Release of Risk and Exposure Assessment Planning Document for the Review of the National Ambient...

    Science.gov (United States)

    2011-09-21

    ... Assessment Planning Document for the Review of the National Ambient Air Quality Standards for Lead AGENCY... available for public review the Review of the National Ambient Air Quality Standards for Lead: Risk and... and/or welfare effects in this review of the national ambient air quality standards (NAAQS) for lead...

  2. Evaluation of the impact of implementation of a Medical Assessment and Planning Unit on length of stay

    NARCIS (Netherlands)

    Brand, Caroline A.; Kennedy, Marcus P.; King-Kallimanis, Bellinda L.; Williams, Ged; Bain, Christopher A.; Russell, David M.

    2010-01-01

    Objective: The Medical Assessment and Planning Unit (MAPU) model provides a multidisciplinary and 'front end loading' approach to acute medical care. The objective of this study was to evaluate the impact of a 10-bed MAPU in Royal Melbourne Hospital (RMH) on hospital length of stay. A pre-post study

  3. National Training Course. Emergency Medical Technician. Paramedic. Instructor's Lesson Plans. Module II. Human Systems and Patient Assessment.

    Science.gov (United States)

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    This instructor's lesson plan guide on human systems and patient assessment is one of fifteen modules designed for use in the training of emergency medical technicians (paramedics). Four units are presented: (1) medical terminology, which covers some common prefixes and suffixes and the use of the medical dictionary; (2) an overview of the…

  4. Applying Comprehensive Environmental Assessment to Research Planning for Multiwalled Carbon Nanotubes: Refinements to Inform Future Stakeholder Engagement

    Science.gov (United States)

    We previously described our collective judgment methods to engage expert stakeholders in the Comprehensive Environmental Assessment (CEA) workshop process applied to nano-TiO2 and nano-Ag research planning. We identified several lessons learned in engaging stakeholders to identif...

  5. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    International Nuclear Information System (INIS)

    1994-06-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites

  6. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites.

  7. From Tragedy To Strategy: Assessing The FDNY’s Post 9/11 Strategic Planning Process

    Science.gov (United States)

    2016-12-01

    and analytical perspective in leaders and managers to synthesize strategies for its future. The recommendations all focus on improving the strategic ... Strategic Planning,” Harvard Business Review, January– February (1994), https://hbr.org/1994/01/the-fall-and-rise-of- strategic -planning; Lawrence, Strategic ...Interdependency between Organization, Performance and Strategic Planning (Berlin: Springer Science & Business Media, 2013), 56. 56 Mintzberg, “The Fall and

  8. Programmatic Environmental Assessment for Base General Plan Development, Schriever Air Force Base, Colorado

    Science.gov (United States)

    2012-06-01

    and is dominated by blue grama (Bouteloua gracilis), buffalo grass (Buchloe dactyloides), three-awned grass (Aristida purpurea), dropseed (Sporobolus...General Plan are to achieve optimal land use planning, protect the natural and human environment, and plan for future mission growth . The Proposed Action...future mission growth , and to improve environmental quality, recreation opportunities, and the safety and medical functions on Base. According to space

  9. Status assessment and conservation plan for the Grasshopper Sparrow (Ammodramus savannarum)

    Science.gov (United States)

    Ruth, Janet M.

    2015-01-01

    The Grasshopper Sparrow (Ammodramus savannarum) breeds in grassland habitats throughout much of the U.S., southern and southeastern Canada, and northern Mexico. Additional subspecies are resident in Central America, northern South America, and the Caribbean. It winters primarily in the coastal states of the southeastern U.S., southern portions of the southwestern states, and in Mexico, Central America, and the Caribbean. The species prefers relatively open grassland with intermediate grass height and density and patchy bare ground; because it is widely distributed across different grassland types in North America, it selects different vegetation structure and species composition depending on what is available. In the winter, they use a broader range of grassland habitats including open grasslands, as well as weedy fields and grasslands with woody vegetation. Analyses show significant range-wide population declines from the late 1960s through the present, primarily caused by habitat loss, degradation, and fragmentation. Grasshopper Sparrow is still a relatively common and broadly distributed species, but because of significant population declines and stakeholder concerns, the species is considered of conservation concern nationally and at the state level for numerous states. Many factors, often related to different grassland management practices (e.g., grazing, burning, mowing, management of shrub encroachment, etc.) throughout the species’ range, have impacts on Grasshopper Sparrow distribution, abundance, and reproduction and may represent limiting factors or threats given steep declines in this species’ population. Because of the concerns for this species, Grasshopper Sparrow has been identified as a focal species by the U.S. Fish and Wildlife Service (USFWS) and this Status Assessment and Conservation Plan for Grasshopper Sparrow has been developed. Through literature searches and input from stakeholders across its range, this plan presents information about

  10. The role of environmental assessment and planning in renewable energy diffusion in the US and Germany

    Energy Technology Data Exchange (ETDEWEB)

    Geissler, Gesa

    2013-09-30

    The worldwide generation of energy from renewable resources such as wind, sun, biomass, water or ground heat, is constantly growing. Numerous countries have adopted renewable energy goals, often as part of their policies on fighting climate change. However, despite ambitious policy goals and increasing numbers in installed capacity, difficulties in the diffusion of renewable energy technologies occur and are jeopardizing the achievement of the targets. Several aspects have been identified to account for these difficulties in renewable energy diffusion. In order to successfully realize the diffusion of renewable energy technologies and to reach the goals for their future contribution to energy generation, the existing hindrances need to be addressed and solved. Planning and permitting, as the relevant decision-making processes, are one element of successful siting and deployment of renewable energy. Part of these planning and permitting processes often are environmental assessments (EA) requiring the consideration of the effects and impacts of the proposed renewable energy projects on the environment. The goal of this PhD thesis is the generation of hypotheses on the role of EA in the diffusion of renewable energy technologies, and on the need for innovation/adaptation of EA to fit the innovation system of renewable energy technology diffusion. This goal will be pursuit by the analysis of EA systems and EA practice related to renewable energy diffusion. Two cases will be analyzed and compared, namely the United States of America and Germany. In general, the conclusion can be drawn that EA for renewable energy diffusion needs to be improved in certain aspects in order to be able to meet the special requirements of this energy system. Some elements in EA legislation and practice pose certain problems in renewable energy diffusion. One field for further research would be the characterization of the role of environmental EA in renewable energy technology diffusion and

  11. The role of environmental assessment and planning in renewable energy diffusion in the US and Germany

    International Nuclear Information System (INIS)

    Geissler, Gesa

    2013-01-01

    The worldwide generation of energy from renewable resources such as wind, sun, biomass, water or ground heat, is constantly growing. Numerous countries have adopted renewable energy goals, often as part of their policies on fighting climate change. However, despite ambitious policy goals and increasing numbers in installed capacity, difficulties in the diffusion of renewable energy technologies occur and are jeopardizing the achievement of the targets. Several aspects have been identified to account for these difficulties in renewable energy diffusion. In order to successfully realize the diffusion of renewable energy technologies and to reach the goals for their future contribution to energy generation, the existing hindrances need to be addressed and solved. Planning and permitting, as the relevant decision-making processes, are one element of successful siting and deployment of renewable energy. Part of these planning and permitting processes often are environmental assessments (EA) requiring the consideration of the effects and impacts of the proposed renewable energy projects on the environment. The goal of this PhD thesis is the generation of hypotheses on the role of EA in the diffusion of renewable energy technologies, and on the need for innovation/adaptation of EA to fit the innovation system of renewable energy technology diffusion. This goal will be pursuit by the analysis of EA systems and EA practice related to renewable energy diffusion. Two cases will be analyzed and compared, namely the United States of America and Germany. In general, the conclusion can be drawn that EA for renewable energy diffusion needs to be improved in certain aspects in order to be able to meet the special requirements of this energy system. Some elements in EA legislation and practice pose certain problems in renewable energy diffusion. One field for further research would be the characterization of the role of environmental EA in renewable energy technology diffusion and

  12. SU-D-BRD-04: The Impact of Automatic Radiation Therapy Plan Checks in Treatment Planning

    International Nuclear Information System (INIS)

    Gopan, O; Yang, F; Ford, E

    2015-01-01

    Purpose: The physics plan check verifies various aspects of a treatment plan after dosimetrists have finished creating the plan. Some errors in the plan which are caught by the physics check could be caught earlier in the departmental workflow. The purpose of this project was to evaluate a plan checking script that can be run within the treatment planning system (TPS) by the dosimetrists prior to plan approval and export to the record and verify system. Methods: A script was created in the Pinnacle TPS to automatically check 15 aspects of a plan for clinical practice conformity. The script outputs a list of checks which the plan has passed and a list of checks which the plan has failed so that appropriate adjustments can be made. For this study, the script was run on a total of 108 plans: IMRT (46/108), VMAT (35/108) and SBRT (27/108). Results: Of the plans checked by the script, 77/108 (71%) failed at least one of the fifteen checks. IMRT plans resulted in more failed checks (91%) than VMAT (51%) or SBRT (63%), due to the high failure rate of an IMRT-specific check, which checks that no IMRT segment < 5 MU. The dose grid size and couch removal checks caught errors in 10% and 14% of all plans – errors that ultimately may have resulted in harm to the patient. Conclusion: Approximately three-fourths of the plans being examined contain errors that could be caught by dosimetrists running an automated script embedded in the TPS. The results of this study will improve the departmental workflow by cutting down on the number of plans that, due to these types of errors, necessitate re-planning and re-approval of plans, increase dosimetrist and physician workload and, in urgent cases, inconvenience patients by causing treatment delays

  13. Integrating environment into land-use planning through strategic environmental assessment in China: Towards legal frameworks and operational procedures

    International Nuclear Information System (INIS)

    Tao Tang; Tan Zhu; He Xu

    2007-01-01

    China currently put forwards 'striving to build an environmentally friendly society' as one of the most important development goals. The land administration authorities are facing the challenge of effectively incorporating environment considerations into their planning system. This paper aims to investigate why and how Strategic Environmental Assessment (SEA) is enacted as an effective tool to integrate the environment into land-use planning during the construction process of an environmentally friendly society in China, and identify factors that influence the integration. It presents characteristics of the land-use planning system, and reviews the progress and current state of SEA in China. Results show that SEA provides many benefits in promoting environmental considerations into the land-use planning process. The legal frameworks and operational procedures, in the context of land-use master planning SEA, are summarized and an assessment made of their effectiveness. Some barriers are highlighted through examination of the latest case studies, and several recommendations are presented to overcome these obstacles

  14. 77 FR 43350 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the San Diego Unified...

    Science.gov (United States)

    2012-07-24

    ... impacts, as described in the applicant's habitat conservation plan (plan). We request data, comments, and..., the Carroll Canyon Preserve on the east and south, and aggregate mining operations on the west. The... compliance with all applicable California Department of Education School Development Guidelines (guidelines...

  15. Assessing Changes in Job Behavior Due to Training: A Guide to the Participant Action Plan Approach.

    Science.gov (United States)

    Office of Personnel Management, Washington, DC.

    This guide provides a brief introduction to the Participant Action Plan Approach (PAPA) and a user's handbook. Part I outlines five steps of PAPA which determine how job behavior is changed by training course or program participation. Part II, the manual, is arranged by the five steps of the PAPA approach. Planning for PAPA discusses making…

  16. Assessment of wind turbines impact on landscape character and landscape planning

    Czech Academy of Sciences Publication Activity Database

    Cetkovský, Stanislav; Nováková, Eva

    2009-01-01

    Roč. 17, č. 2 (2009), s. 28-34 ISSN 1210-8812 Institutional research plan: CEZ:AV0Z30860518 Keywords : landscape character * wind turbines * landscape planning * GIS * visualisation * Czech Republic Subject RIV: DE - Earth Magnetism, Geodesy, Geography http://www.scopus.com/record/display.url?eid=2-s2.0-70449368205&origin

  17. Combining pre-spill shoreline segmentation data and shoreline assessment tools to support early response management and planning

    International Nuclear Information System (INIS)

    Lamarche, A.; Owens, E.H.; Martin, V.; Laforest, S.

    2003-01-01

    Several organizations, such as Environment Canada and the Alyeska Pipeline Service Company, are developing or refining pre-spill databases containing information about physical shoreline characteristics. Automated links between these pre-spill shoreline characteristic databases and computerized shoreline assessment tools were recently created by Environment Canada (Quebec and Ontario regions). The tools, which use Geographical Information System (GIS) technology, can be used for planning and documenting support needed for shoreline cleanup operations. A training exercise, designed to evaluate a spill management system integrating the Quebec region pre-spill shoreline database and the ShoreAssess R shoreline assessment system, was conducted at Vercheres, Quebec in October 2002 by Eastern Canada Response Corporation. The testing took place during the planning stage of the early phases of a spill, namely after the first over-flight. The computerized shoreline assessment tools made it possible to evaluate the length and type of shoreline that would potentially be impacted by oil. The tools also made it possible to assess the shoreline treatment methods most likely to be used, and evaluate the probable duration of the cleanup operation. The information would have to be available in time to be considered during the planning activities. The training exercise demonstrated that the integration of the databases is a valuable tool during the early phases of an oil spill response. 9 refs., 2 tabs., 6 figs

  18. RCRA Assessment Plan for Single-Shell Tank Waste Management Area S-SX at the Hanford Site

    International Nuclear Information System (INIS)

    Chou, C.J.; Johnson, V.G.

    1999-01-01

    A groundwater quality assessment plan was prepared for waste management area S-SX at the Hanford Site. Groundwater monitoring is conducted at this facility in accordance with Title 40, Code of Federal Regulation (CFR) Part 265, Subpart F [and by reference of Washington Administrative Code (WAC) 173-303-400(3)]. The facility was placed in assessment groundwater monitoring program status after elevated waste constituents and indicator parameter measurements (i.e., chromium, technetium-99 and specific conductance) in downgradient monitoring wells were observed and confirmed. A first determination, as allowed under 40 CFR 265.93(d), provides the owner/operator of a facility an opportunity to demonstrate that the regulated unit is not the source of groundwater contamination. Based on results of the first determination it was concluded that multiple source locations in the waste management area could account for observed spatial and temporal groundwater contamination patterns. Consequently, a continued investigation is required. This plan, developed using the data quality objectives process, is intended to comply with the continued investigation requirement. Accordingly, the primary purpose of the present plan is to determine the rate and extent of dangerous waste (hexavalent chromium and nitrate) and radioactive constituents (e.g., technetium-99) in groundwater and to determine their concentrations in groundwater beneath waste management area S-SX. Comments and concerns expressed by the Washington State Department of Ecology on the initial waste management area S-SX assessment report were addressed in the descriptive narrative of this plan as well as in the planned activities. Comment disposition is documented in a separate addendum to this plan

  19. ASSESSMENT OF KNOWLEDGE REGARDING FAMILY PLANNING METHODS AND INTENDED FAMILY SIZE AMONG MEN OF URBAN SLUM

    Directory of Open Access Journals (Sweden)

    Anand Mohan Dixit

    2013-12-01

    Full Text Available Objective: To assess the knowledge of contraceptive methods and intended family size among the men of urban slum.Material and Method: Present study conducted in urban slum area of Jaipur. Information from 400 married men of age group 18-49 years collected on semi structured schedule during June to October 2012.House to house survey conducted to achieve defined sample size. Data were analyzed by using SPSS 12 soft ware. Chi square, t test and ANOVA were used for interpretation.Result and Conclusion: Most commonly known methods of family planning were female sterilization (95.2%, condom (94.7% and Male sterilization (93.5%.  IUCD (57% was still not popularly known method of contraception. Emergency contraceptive pills (12.2% and Injectables (25.7% were least known methods among men. Knowledge of different contraceptive differs according to educational status and caste of men.  TV and radio were main source of information. Only 16% men said that they got information from health personnel. On analysis present family size was 3.125 while desired family size was 2.63, it shows that two child norm is not ideal to all. Men who had already two children 53 % of them still want to expand their family. Approximately half of the men feel that they have larger family size and the main reasons were inappropriate knowledge (37% and ignorance (21%. Those men who want to expand their family size, son preference was the major reason. Only 3% men show the intention of one child as ideal in family, which indicate that one child norm is too far to reach.

  20. Assessing Intra-arterial Complications of Planning and Treatment Angiograms for Y-90 Radioembolization

    Energy Technology Data Exchange (ETDEWEB)

    Ahmed, Osman, E-mail: osman1423@gmail.com [Rush University Medical Center, Section of Interventional Radiology, Department of Radiology (United States); Patel, Mikin V. [University of Chicago, Department of Radiology (United States); Masrani, Abdulrahman; Chong, Bradford; Osman, Mohammed; Tasse, Jordan; Soni, Jayesh; Turba, Ulku Cenk; Arslan, Bulent [Rush University Medical Center, Section of Interventional Radiology, Department of Radiology (United States)

    2017-05-15

    PurposeTo report hepatic arterial-related complications encountered during planning and treatment angiograms for radioembolization and understand any potential-associated risk factors.Materials and Methods518 mapping or treatment angiograms for 180 patients with primary or metastatic disease to the liver treated by Yttrium-90 radioembolization between 2/2010 and 12/2015 were retrospectively reviewed. Intra-procedural complications were recorded per SIR guidelines. Patient demographics, indication for treatment, prior exposure to chemotherapeutic agents, operator experience, and disease burden were reviewed. Technical variables including type of radioembolic (glass vs. resin microspheres), indication for angiography (mapping vs. treatment), variant anatomy, and attempts at coil embolization were also assessed.ResultsThirteen (13/518, 2.5%) arterial-related complications occurred in 13 patients. All but two complications resulted during transcatheter coil embolization to prevent non-target embolization. Complications included coil migration (n = 6), arterial dissection (n = 2), focal vessel perforation (n = 2), arterial thrombus (n = 2), and vasospasm prohibiting further arterial sub-selection (n = 1). Transarterial coiling was identified as a significant risk factor of complications on both univariate and multivariate regression analysis (odds ratio 7.8, P = 0.004). Usage of resin microspheres was also a significant risk factor (odds ratio 9.5, P = 0.042). No other technical parameters or pre-procedural variables were significant after adjusting for confounding on multivariate analysis (P > 0.05).ConclusionIntra-procedural hepatic arterial complications encountered during radioembolization were infrequent but occurred mainly during coil embolization to prevent non-target delivery to extra-hepatic arteries.