  1. Joint Test Plan for Gas Dynamic Spray Technology Demonstration

    Science.gov (United States)

    Lewis, Pattie

    2008-01-01

    undergo some type of surface preparation and/or depainting operation to ensure adhesion of the new coating system. The GDS unit selected for demonstration has a powder feeding system that can be used for surface preparation or coating application. The surface preparation feature will also be examined. The primary objective of this effort is to demonstrate GDS technology as a repair method for TSCs. The project will also determine the optimal GDS coating thickness for acceptable performance. Successful completion of this project will result in approval of GDS technology as a repair method for TSCs at AFSPC and NASA installations and will improve corrosion protection at critical systems, facilitate easier maintenance activity, extend maintenance cycles, eliminate flight hardware contamination, and reduce the amount of hazardous waste generated.

  2. Tested Demonstrations.

    Science.gov (United States)

    Gilbert, George L.

    1990-01-01

    Included are three demonstrations that include the phase change of ice when under pressure, viscoelasticity and colloid systems, and flame tests for metal ions. The materials, procedures, probable results, and applications to real life situations are included. (KR)

  3. Intertechnology Corporation proposed test and evaluation plan, commercial buildings. National Solar Demonstration Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-09-01

    This report has three major parts. The first of these derives the requirements for the Test and Evaluation plan from the System Level Plan which is summarized in Section II. The second part contains the proposed plan to fill these requirements and includes hardware and software recommendations as well as procedures and management considerations. Primary emphasis has been given to the remote site because this is the area in which the commercial part of the demonstration is most unique. Finally, some pre-demonstration activities are described. The pilot program is intended to resolve a number of issues which arose in the course of the T and E plan. These relate to choice of scan frequencies, compression algorithms, etc. It is also intended to confirm performance and cost effectiveness of the site data collection package. The base line measurements of attitudes, etc. provide a reference mark against which one can measure the non-technical effectiveness of the demonstration program. (WDM)

  4. Tested Demonstrations.

    Science.gov (United States)

    Sands, Robert; And Others

    1982-01-01

    Procedures for two demonstrations are provided. The solubility of ammonia gas in water is demonstrated by introducing water into a closed can filled with the gas, collapsing the can. The second demonstration relates scale of standard reduction potentials to observed behavior of metals in reactions with hydrogen to produce hydrogen gas. (Author/JN)

  5. Tested Demonstrations.

    Science.gov (United States)

    Gilbert, George L., Ed.

    1983-01-01

    Free radical chlorination of methane is used in organic chemistry to introduce free radical/chain reactions. In spite of its common occurrence, demonstrations of the reaction are uncommon. Therefore, such a demonstration is provided, including background information, preparation of reactants/reaction vessel, introduction of reactants, irradiation,…

  6. Tested Demonstrations.

    Science.gov (United States)

    Gilbert, George L., Ed.

    1983-01-01

    Discusses a supplement to the "water to rose" demonstration in which a pink color is produced. Also discusses blood buffer demonstrations, including hydrolysis of sodium bicarbonate, simulated blood buffer, metabolic acidosis, natural compensation of metabolic acidosis, metabolic alkalosis, acidosis treatment, and alkalosis treatment. Procedures…

  7. Tested Demonstrations.

    Science.gov (United States)

    Gilbert, George L., Ed.

    1987-01-01

    Describes two laboratory demonstrations in chemistry. One uses dry ice, freon, and freezer bags to demonstrate volume changes, vapor-liquid equilibrium, a simulation of a rain forest, and vaporization. The other uses the clock reaction technique to illustrate fast reactions and kinetic problems in releasing carbon dioxide during respiration. (TW)

  8. Tested Demonstrations.

    Science.gov (United States)

    Gilbert, George L., Ed.

    1986-01-01

    Outlines a simple, inexpensive way of demonstrating electroplating using the reaction between nickel ions and copper metal. Explains how to conduct a demonstration of the electrolysis of water by using a colored Na2SO4 solution as the electrolyte so that students can observe the pH changes. (TW)

  9. Tested Demonstrations.

    Science.gov (United States)

    Gilbert, George L., Ed.

    1980-01-01

    Presented is a Corridor Demonstration which can be set up in readily accessible areas such as hallways or lobbies. Equipment is listed for a display of three cells (solar cells, fuel cells, and storage cells) which develop electrical energy. (CS)

  10. Tested Demonstrations.

    Science.gov (United States)

    Gilbert, George L., Ed.

    1987-01-01

    Presents three demonstrations suitable for undergraduate chemistry classes. Focuses on experiments with calcium carbide, the induction by iron of the oxidation of iodide by dichromate, and the classical iodine clock reaction. (ML)

  11. Tested Demonstrations.

    Science.gov (United States)

    Gilbert, George L., Ed.

    1987-01-01

    Describes two demonstrations to illustrate characteristics of substances. Outlines a method to detect the changes in pH levels during the electrolysis of water. Uses water pistols, one filled with methane gas and the other filled with water, to illustrate the differences in these two substances. (TW)

  12. Test plan for the remote conveyance and innovative end effector demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Rice, P.; Smith, A.M. [EG& G Idaho, Inc., Idaho Falls, ID (United States). Idaho National Engineering Lab.; Peterson, R.

    1994-08-01

    This test plan describes the demonstration of innovative equipment and processes specifically designed to be superior to currently employed technology for buried waste retrieval. The dumping of dry soil into a funnel/dumpster arrangement has been found to be the primary mechanism for dust generation during the retrieval of buried transuranic waste. The primary goal of the innovative end effector is to reduce dust generation and the potential spread of airborne contaminants during the dumping operation. In addition, regardless of the excavation technique, exhumed waste will have to be conveyed away from the retrieval area to a packaging area or directly to a treatment facility. The remote conveyance system is aimed at developing a remotely controlled vehicle to convey retrieved waste that will operate on variable terrain and remove workers from the hazardous zone. To demonstrate the remote conveyance system and the innovative end effector, the Buried Waste Integrated Demonstration (BWID) Program has subcontracted with RAHCO International to provide equipment and services to perform a demonstration of the technologies. The demonstration will be performed in two phases. In Phase I, the subcontractor will perform a full scale demonstration to assess the ability of the innovative end effector to control dust generation and the potential spread of contamination during dumping operations. Phase II includes performing a retrieval/conveyance demonstration. This demonstration will excavate, dump, and convey simulated waste to demonstrate the functionality of the system (e.g., maneuverability, retrieval rates, and system integration). Phase II of the demonstration will include all elements of the remote conveyance and end effector system. This test plan will describe the demonstration objectives, data quality objectives, equipment operation, and methods for collecting data during the demonstration.

  13. AZ-101 Mixer Pump Demonstration and Tests Data Management Analysis Plan

    Energy Technology Data Exchange (ETDEWEB)

    DOUGLAS, D.G.

    2000-02-22

    This document provides a plan for the analysis of the data collected during the AZ-101 Mixer Pump Demonstration and Tests. This document was prepared after a review of the AZ-101 Mixer Pump Test Plan (Revision 4) [1] and other materials. The plan emphasizes a structured and well-ordered approach towards handling and examining the data. This plan presumes that the data will be collected and organized into a unified body of data, well annotated and bearing the date and time of each record. The analysis of this data will follow a methodical series of steps that are focused on well-defined objectives. Section 2 of this plan describes how the data analysis will proceed from the real-time monitoring of some of the key sensor data to the final analysis of the three-dimensional distribution of suspended solids. This section also identifies the various sensors or sensor systems and associates them with the various functions they serve during the test program. Section 3 provides an overview of the objectives of the AZ-101 test program and describes the data that will be analyzed to support that test. The objectives are: (1) to demonstrate that the mixer pumps can be operated within the operating requirements; (2) to demonstrate that the mixer pumps can mobilize the sludge in sufficient quantities to provide feed to the private contractor facility, and (3) to determine if the in-tank instrumentation is sufficient to monitor sludge mobilization and mixer pump operation. Section 3 also describes the interim analysis that organizes the data during the test, so the analysis can be more readily accomplished. Section 4 describes the spatial orientation of the various sensors in the tank. This section is useful in visualizing the relationship of the Sensors in terms of their location in the tank and how the data from these sensors may be related to the data from other sensors. Section 5 provides a summary of the various analyses that will be performed on the data during the test

  14. Test plan for the soils facility demonstration: A petroleum contaminated soil bioremediation facility

    Energy Technology Data Exchange (ETDEWEB)

    Lombard, K.H.

    1994-08-01

    The objectives of this test plan are to show the value added by using bioremediation as an effective and environmentally sound method to remediate petroleum contaminated soils (PCS) by: demonstrating bioremediation as a permanent method for remediating soils contaminated with petroleum products; establishing the best operating conditions for maximizing bioremediation and minimizing volatilization for SRS PCS during different seasons; determining the minimum set of analyses and sampling frequency to allow efficient and cost-effective operation; determining best use of existing site equipment and personnel to optimize facility operations and conserve SRS resources; and as an ancillary objective, demonstrating and optimizing new and innovative analytical techniques that will lower cost, decrease time, and decrease secondary waste streams for required PCS assays.

  15. Design and Test Plans for a Non-Nuclear Fission Power System Technology Demonstration Unit

    Science.gov (United States)

    Mason, Lee; Palac, Donald; Gibson, Marc; Houts, Michael; Warren, John; Werner, James; Poston, David; Qualls, Arthur Lou; Radel, Ross; Harlow, Scott

    2012-01-01

    A joint National Aeronautics and Space Administration (NASA) and Department of Energy (DOE) team is developing concepts and technologies for affordable nuclear Fission Power Systems (FPSs) to support future exploration missions. A key deliverable is the Technology Demonstration Unit (TDU). The TDU will assemble the major elements of a notional FPS with a non-nuclear reactor simulator (Rx Sim) and demonstrate system-level performance in thermal vacuum. The Rx Sim includes an electrical resistance heat source and a liquid metal heat transport loop that simulates the reactor thermal interface and expected dynamic response. A power conversion unit (PCU) generates electric power utilizing the liquid metal heat source and rejects waste heat to a heat rejection system (HRS). The HRS includes a pumped water heat removal loop coupled to radiator panels suspended in the thermal-vacuum facility. The basic test plan is to subject the system to realistic operating conditions and gather data to evaluate performance sensitivity, control stability, and response characteristics. Upon completion of the testing, the technology is expected to satisfy the requirements for Technology Readiness Level 6 (System Demonstration in an Operational and Relevant Environment) based on the use of high-fidelity hardware and prototypic software tested under realistic conditions and correlated with analytical predictions.

  16. Experimental Plan for the Cold Demonstration (Scoping Tests) of Glass Removal Methods from a DWPF Melter

    Energy Technology Data Exchange (ETDEWEB)

    Smith, M.E.

    2001-09-21

    SRS and WVDP currently do not have the capability to size reduce, decontaminate, classify, and dispose of large, failed, highly contaminated equipment. Tanks Focus Area Task 777 was developed to address this problem. The first activity for Task 777 is to develop and demonstrate techniques suitable for removing the solid HLW glass from HLW melters. This experimental plan describes the work that will be performed for this glass removal demonstration.

  17. Demonstration testing and evaluation of in situ soil heating. Health and safety plan (Revision 2)

    Energy Technology Data Exchange (ETDEWEB)

    Dev, H.

    1994-12-28

    This document is the Health and Safety Plan (HASP) for the demonstration of IITRI`s EM Treatment Technology. In this process, soil is heated in situ by means of electrical energy for the removal of hazardous organic contaminants. This process will be demonstrated on a small plot of contaminated soil located in the Pit Area of Classified Burial Ground K-1070-D, K-25 Site, Oak Ridge, TN. The purpose of the demonstration is to remove organic contaminants present in the soil by heating to a temperature range of 85{degrees} to 95{degrees}C. The soil will be heated in situ by applying 60-Hz AC power to an array of electrodes placed in boreholes drilled through the soil. In this section a brief description of the process is given along with a description of the site and a listing of the contaminants found in the area.

  18. Test plan :

    Energy Technology Data Exchange (ETDEWEB)

    Dwyer, Stephen F.

    2013-05-01

    This test plan is a document that provides a systematic approach to the planned testing of rooftop structures to determine their actual load carrying capacity. This document identifies typical tests to be performed, the responsible parties for testing, the general feature of the tests, the testing approach, test deliverables, testing schedule, monitoring requirements, and environmental and safety compliance.

  19. Test plan: the Czechowice Oil Refinery bioremediation demonstration of a process waste lagoon

    Energy Technology Data Exchange (ETDEWEB)

    Altman, D.J.; Lombard, K.H.; Hazen, T.C.

    1997-03-31

    The remediation strategies that will be applied at the Czechowice Oil Refinery waste lagoon in Czechowice, Poland are designed, managed, and implemented under the direction of the Westinghouse Savannah River Company (WSRC) for the United States Department of Energy (DOE). WSRC will be assisted in the demonstration by The Institute for Ecology of Industrial Areas (IETU). This collaboration between IETU and DOE will provide the basis for international technology transfer of new and innovative remediation technologies that can be applied in Poland and the Eastern European Region as well.

  20. Test plan, the Czechowice Oil Refinery bioremediation demonstration of a process waste lagoon. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Altman, D.J.; Hazen, T.C.; Tien, A.J. [Westinghouse Savannah River Co., Aiken, SC (United States). Savannah River Technology Center; Worsztynowicz, A.; Ulfig, K. [Inst. for Ecology of Industrial Areas, Katowice (Poland)

    1997-05-10

    The overall objective of the bioremediation project is to provide a cost effective bioremediation demonstration of petroleum contaminated soil at the Czechowice Oil Refinery. Additional objectives include training of personnel, and transfer of this technology by example to Poland, and the Risk Abatement Center for Central and Eastern Europe (RACE). The goal of the remediation is to reduce the risk of PAH compounds in soil and provide a green zone (grassy area) adjacent to the site boundary. Initial project discussions with the Czechowice Oil Refinery resulted in helping the refinery find an immediate cost effective solution for the dense organic sludge in the lagoons. They found that when mixed with other waste materials, the sludge could be sold as a fuel source to local cement kilns. Thus the waste was incinerated and provided a revenue stream for the refinery to cleanup the lagoon. This allowed the bioremediation project to focus on remediation of contaminated soil that unusable as fuel, less recalcitrant and easier to handle and remediate. The assessment identified 19 compounds at the refinery that represented significant risk and would require remediation. These compounds consisted of metals, PAH`s, and BTEX. The contaminated soil to be remediated in the bioremediation demonstration contains only PAH (BTEX and metals are not significantly above background concentrations). The final biopile design consists of (1) dewatering and clearing lagoon A to clean clay, (2) adding a 20 cm layer of dolomite with pipes for drainage, leachate collection, air injection, and pH adjustment, (3) adding a 1.1 m layer of contaminated soil mixed with wood chips to improve permeability, and (4) completing the surface with 20 cm of top soil planted with grass.

  1. Buried Waste Integrated Demonstration Plan

    Energy Technology Data Exchange (ETDEWEB)

    Kostelnik, K.M.

    1991-12-01

    This document presents the plan of activities for the Buried Waste Integrated Demonstration (BWID) program which supports the environmental restoration (ER) objectives of the Department of Energy (DOE) Complex. Discussed in this plan are the objectives, organization, roles and responsibilities, and the process for implementing and managing BWID. BWID is hosted at the Idaho National Engineering Laboratory (INEL), but involves participants from throughout the DOE Complex, private industry, universities, and the international community. These participants will support, demonstrate, and evaluate a suite of advanced technologies representing a comprehensive remediation system for the effective and efficient remediation of buried waste. The processes for identifying technological needs, screening candidate technologies for applicability and maturity, selecting appropriate technologies for demonstration, field demonstrating, evaluation of results and transferring technologies to environmental restoration programs are also presented. This document further describes the elements of project planning and control that apply to BWID. It addresses the management processes, operating procedures, programmatic and technical objectives, and schedules. Key functions in support of each demonstration such as regulatory coordination, safety analyses, risk evaluations, facility requirements, and data management are presented.

  2. McClellan Air Force Base operable unit B, two-phase extraction system demonstration test, work implementation plan for McClellan AFB, California. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-03

    This document is an integrated demonstration and work plan that presents the technical approach for design, implementation, and testing of two-phase extraction as compared with pump and treat technology in Operable Unit B, investigative cluster IC1 at the McClellan Air Force Base. This work is being coordinated with Clean Sites under a cooperative agreement with EPA's Technology Innovation Office and Superfund Innovative Technology Evaluation Program.

  3. Test plan for in situ bioremediation demonstration of the Savannah River Integrated Demonstration Project DOE/OTD TTP No.: SR 0566-01. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    Hazen, T.C.

    1991-09-18

    This project is designed to demonstrate in situ bioremediation of groundwater and sediment contaminated with chlorinated solvents. Indigenous microorganisms will be simulated to degrade trichloroethylene (TCE), tetrachloroethylene (PCE) and their daughter products in situ by addition of nutrients to the contaminated zone. in situ biodegradation is a highly attractive technology for remediation because contaminants are destroyed, not simply moved to another location or immobilized, thus decreasing costs, risks, and time, while increasing efficiency and public and regulatory acceptability. Bioremediation has been found to be among the least costly technologies in applications where it will work.

  4. Magnetic Launch Assist Demonstration Test

    Science.gov (United States)

    2001-01-01

    This image shows a 1/9 subscale model vehicle clearing the Magnetic Launch Assist System, formerly referred to as the Magnetic Levitation (MagLev), test track during a demonstration test conducted at the Marshall Space Flight Center (MSFC). Engineers at MSFC have developed and tested Magnetic Launch Assist technologies. To launch spacecraft into orbit, a Magnetic Launch Assist System would use magnetic fields to levitate and accelerate a vehicle along a track at very high speeds. Similar to high-speed trains and roller coasters that use high-strength magnets to lift and propel a vehicle a couple of inches above a guideway, a launch-assist system would electromagnetically drive a space vehicle along the track. A full-scale, operational track would be about 1.5-miles long and capable of accelerating a vehicle to 600 mph in 9.5 seconds. This track is an advanced linear induction motor. Induction motors are common in fans, power drills, and sewing machines. Instead of spinning in a circular motion to turn a shaft or gears, a linear induction motor produces thrust in a straight line. Mounted on concrete pedestals, the track is 100-feet long, about 2-feet wide and about 1.5-feet high. The major advantages of launch assist for NASA launch vehicles is that it reduces the weight of the take-off, the landing gear, the wing size, and less propellant resulting in significant cost savings. The US Navy and the British MOD (Ministry of Defense) are planning to use magnetic launch assist for their next generation aircraft carriers as the aircraft launch system. The US Army is considering using this technology for launching target drones for anti-aircraft training.

  5. On-Site Fuel Cell Energy Systems: The U.S. Air Force Field Test Demonstration Plan.

    Science.gov (United States)

    1980-12-01

    attractive early entry markts , and o buqiness ;tudies ay the potential user utilities to examine and define proposed business scenarios for the commercial...of power plants: o All market segments should be tested. The market segments include residential (multi-family), commercial and light industrial appl...icat ionF, o Various building types in each market segment should be tested to cover the range of electrical and thermal loads, installation

  6. Buried Waste Integrated Demonstration Plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Kostelnik, K.M.

    1991-12-01

    This document presents the plan of activities for the Buried Waste Integrated Demonstration (BWID) program which supports the environmental restoration (ER) objectives of the Department of Energy (DOE) Complex. Discussed in this plan are the objectives, organization, roles and responsibilities, and the process for implementing and managing BWID. BWID is hosted at the Idaho National Engineering Laboratory (INEL), but involves participants from throughout the DOE Complex, private industry, universities, and the international community. These participants will support, demonstrate, and evaluate a suite of advanced technologies representing a comprehensive remediation system for the effective and efficient remediation of buried waste. The processes for identifying technological needs, screening candidate technologies for applicability and maturity, selecting appropriate technologies for demonstration, field demonstrating, evaluation of results and transferring technologies to environmental restoration programs are also presented. This document further describes the elements of project planning and control that apply to BWID. It addresses the management processes, operating procedures, programmatic and technical objectives, and schedules. Key functions in support of each demonstration such as regulatory coordination, safety analyses, risk evaluations, facility requirements, and data management are presented.

  7. Marketing Plan for Demonstration and Validation Assets

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-05-30

    The National Security Preparedness Project (NSPP), is to be sustained by various programs, including technology demonstration and evaluation (DEMVAL). This project assists companies in developing technologies under the National Security Technology Incubator program (NSTI) through demonstration and validation of technologies applicable to national security created by incubators and other sources. The NSPP also will support the creation of an integrated demonstration and validation environment. This report documents the DEMVAL marketing and visibility plan, which will focus on collecting information about, and expanding the visibility of, DEMVAL assets serving businesses with national security technology applications in southern New Mexico.

  8. Buried waste integrated demonstration FY 94 deployment plan

    Energy Technology Data Exchange (ETDEWEB)

    Hyde, R.A.; Walker, S.; Garcia, M.M.

    1994-05-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the U.S. Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The fiscal year (FY) 1994 effort will fund thirty-eight technologies in five areas of buried waste site remediation: site characterization, waste characterization, retrieval, treatment, and containment/stabilization. This document is the basic operational planning document for deployment of all BWID projects. Discussed in this document are the BWID preparations for INEL field demonstrations, INEL laboratory demonstrations, non-INEL demonstrations, and paper studies. Each technology performing tests will prepare a test plan to detail the specific procedures, objectives, and tasks of each test. Therefore, information specific to testing each technology is intentionally omitted from this document.

  9. Decision support software technology demonstration plan

    Energy Technology Data Exchange (ETDEWEB)

    SULLIVAN,T.; ARMSTRONG,A.

    1998-09-01

    The performance evaluation of innovative and alternative environmental technologies is an integral part of the US Environmental Protection Agency's (EPA) mission. Early efforts focused on evaluating technologies that supported the implementation of the Clean Air and Clean Water Acts. In 1986 the Agency began to demonstrate and evaluate the cost and performance of remediation and monitoring technologies under the Superfund Innovative Technology Evaluation (SITE) program (in response to the mandate in the Superfund Amendments and Reauthorization Act of 1986 (SARA)). In 1990, the US Technology Policy was announced. This policy placed a renewed emphasis on making the best use of technology in achieving the national goals of improved quality of life for all Americans, continued economic growth, and national security. In the spirit of the technology policy, the Agency began to direct a portion of its resources toward the promotion, recognition, acceptance, and use of US-developed innovative environmental technologies both domestically and abroad. Decision Support Software (DSS) packages integrate environmental data and simulation models into a framework for making site characterization, monitoring, and cleanup decisions. To limit the scope which will be addressed in this demonstration, three endpoints have been selected for evaluation: Visualization; Sample Optimization; and Cost/Benefit Analysis. Five topics are covered in this report: the objectives of the demonstration; the elements of the demonstration plan; an overview of the Site Characterization and Monitoring Technology Pilot; an overview of the technology verification process; and the purpose of this demonstration plan.

  10. Advanced Demonstration and Test Reactor Options Study

    Energy Technology Data Exchange (ETDEWEB)

    Petti, David Andrew [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hill, R. [Argonne National Lab. (ANL), Argonne, IL (United States); Gehin, J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Gougar, Hans David [Idaho National Lab. (INL), Idaho Falls, ID (United States); Strydom, Gerhard [Idaho National Lab. (INL), Idaho Falls, ID (United States); Heidet, F. [Argonne National Lab. (ANL), Argonne, IL (United States); Kinsey, J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Grandy, Christopher [Argonne National Lab. (ANL), Argonne, IL (United States); Qualls, A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Brown, Nicholas [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Powers, J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hoffman, E. [Argonne National Lab. (ANL), Argonne, IL (United States); Croson, D. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2017-01-01

    Global efforts to address climate change will require large-scale decarbonization of energy production in the United States and elsewhere. Nuclear power already provides 20% of electricity production in the United States (U.S.) and is increasing in countries undergoing rapid growth around the world. Because reliable, grid-stabilizing, low emission electricity generation, energy security, and energy resource diversity will be increasingly valued, nuclear power’s share of electricity production has a potential to grow. In addition, there are non electricity applications (e.g., process heat, desalination, hydrogen production) that could be better served by advanced nuclear systems. Thus, the timely development, demonstration, and commercialization of advanced nuclear reactors could diversify the nuclear technologies available and offer attractive technology options to expand the impact of nuclear energy for electricity generation and non-electricity missions. The purpose of this planning study is to provide transparent and defensible technology options for a test and/or demonstration reactor(s) to be built to support public policy, innovation and long term commercialization within the context of the Department of Energy’s (DOE’s) broader commitment to pursuing an “all of the above” clean energy strategy and associated time lines. This planning study includes identification of the key features and timing needed for advanced test or demonstration reactors to support research, development, and technology demonstration leading to the commercialization of power plants built upon these advanced reactor platforms. This planning study is consistent with the Congressional language contained within the fiscal year 2015 appropriation that directed the DOE to conduct a planning study to evaluate “advanced reactor technology options, capabilities, and requirements within the context of national needs and public policy to support innovation in nuclear energy

  11. Resource recovery: research development and demonstration plan

    Energy Technology Data Exchange (ETDEWEB)

    Scaramelli, A B

    1979-10-01

    Implementation of resource recovery is being retarded by technological uncertainties and institutional impediments. Development and commercialization of new competitive technologies are not proceeding rapidly because a structured development program for the industry is lacking. The US Department of Energy (DOE) has recognized these problems, and as part of its overall program in energy recovery from urban waste, it is developing a near- and longer-term research, development, and demonstration (RD and D) program to accelerate commercialization of promising resource recovery technologies. The MITRE Corporation was contracted to develop a near-term RD and D Plan for resource recovery which identifies actions which should be taken over the next three years to accelerate commercialization of existing and developing technologies. The research needs presented in this Plan exist in the industry today. The resolution, however, is not necessarily the sole responsibility of DOE, but rather calls for a combination of public and private sector efforts. An individual research program is presented for each resource recovery technology. A program consists of a combination of bench-, pilot-, demonstration-, and full-scale process and equipment evaluations as well as qualitative and quantitative studies. Each research program is tailored to alleviate the problems of a technology such that their resolution will accelerate the rate at which the technology advances toward commercial readiness and realizes commercial implementation. All the research needs identified are actions which should be taken in the next three years to advance the field of resource recovery.

  12. Remote Excavation System test plan

    Energy Technology Data Exchange (ETDEWEB)

    Walker, S.; Hyde, R.A.

    1993-05-01

    The Office of Technology Development (OTD) established the Robotics Technology Development Program (RTDP) to integrate robotic development activities on a national basis; provide needs-oriented, timely, and economical robotics technology to support environmental and waste operations activities at Department of Energy (DOE) sites; and provide the focus and direction for the near term (less than five years) and guidance for the tong-term (five to twenty years) research and development efforts for site-specific problems. The RTDP consists of several programs including the Buried Waste Robotics Program (BWRP), which addresses remote buried waste applications. The Remote Excavation System (RES) was developed under the RTDP to provide a safer method of excavating hazardous materials for both the DOE and the Department of Defense (DOD). The excavator, initially developed by the DOD as a manually-operated small excavator, has been modified for teleoperation with joint funding from the BWRP and the DOD. The Buried Waste Integrated Demonstration (BWID) and the Uranium Soils Integrated Demonstration (USID) are funding the demonstration, testing, and evaluation of the RES covered in this test plan. This document covers testing both at Oak Ridge National Laboratory (ORNL) and the Idaho National Engineering Laboratory (INEL), as funded by BWID and USID. This document describes the tests planned for the RES demonstration for the BWRP. The purposes of the test plan are (1) to establish test parameters to ensure that the demonstration results are deemed useful and usable and (2) to demonstrate performance in a safe manner within all regulatory requirements.

  13. Test Plan for the Demonstration of Geophysical Techniques for Single-Shell Tank Leak Detection at the Hanford Mock Tank Site: Fiscal Year 2001

    Energy Technology Data Exchange (ETDEWEB)

    Barnett, D. Brent; Gee, Glendon W.; Sweeney, Mark D.

    2001-07-31

    As part of the Leak Detection, Monitoring and Mitigation (LDMM) program conducted by CH2M HILL 105-A during FY 2001. These tests are being conducted to assess the applicability of these methods (Electrical Resistance Tomography [ERT], High Resolution Resistivity [HRR], Cross-Borehole Seismography [XBS], Cross-Borehole Radar [XBR], and Cross-Borehole Electromagnetic Induction [CEMI]) to the detection and measurement of Single Shell Tank (SST) leaks into the vadose zone during planned sluicing operations. The testing in FY 2001 will result in the selection of up to two methods for further testing in FY 2002. In parallel with the geophysical tests, a Partitioning Interwell Tracer Test (PITT) study will be conducted simultaneously at the Mock Tank to assess the effectiveness of this technology in detecting and quantifying tank leaks in the vadose zone. Preparatory and background work using Cone Penetrometer methods (CPT) will be conducted at the Mock Tank site and an adjacent test area to derive soil properties for groundtruthing purposes for all methods.

  14. ETV/ESTCP Demonstration Plan - Demonstration and Verification of a Turbine Power Generation System Utilizing Renewable Fuel: Landfill Gas

    Science.gov (United States)

    This Test and Quality Assurance Plan (TQAP) provides data quality objections for the success factors that were validated during this demonstration include energy production, emissions and emission reductions compared to alternative systems, economics, and operability, including r...

  15. Magnetic Launch Assist System Demonstration Test

    Science.gov (United States)

    2001-01-01

    Engineers at the Marshall Space Flight Center (MSFC) have been testing Magnetic Launch Assist Systems, formerly known as Magnetic Levitation (MagLev) technologies. To launch spacecraft into orbit, a Magnetic Launch Assist system would use magnetic fields to levitate and accelerate a vehicle along a track at a very high speed. Similar to high-speed trains and roller coasters that use high-strength magnets to lift and propel a vehicle a couple of inches above a guideway, the launch-assist system would electromagnetically drive a space vehicle along the track. A full-scale, operational track would be about 1.5-miles long and capable of accelerating a vehicle to 600 mph in 9.5 seconds. This photograph shows a subscale model of an airplane running on the experimental track at MSFC during the demonstration test. This track is an advanced linear induction motor. Induction motors are common in fans, power drills, and sewing machines. Instead of spinning in a circular motion to turn a shaft or gears, a linear induction motor produces thrust in a straight line. Mounted on concrete pedestals, the track is 100-feet long, about 2-feet wide, and about 1.5- feet high. The major advantages of launch assist for NASA launch vehicles is that it reduces the weight of the take-off, the landing gear, the wing size, and less propellant resulting in significant cost savings. The US Navy and the British MOD (Ministry of Defense) are planning to use magnetic launch assist for their next generation aircraft carriers as the aircraft launch system. The US Army is considering using this technology for launching target drones for anti-aircraft training.

  16. Test and Demonstration Assets of New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-03-31

    This document was developed by the Arrowhead Center of New Mexico State University as part of the National Security Preparedness Project (NSPP), funded by a DOE/NNSA grant. The NSPP has three primary components: business incubation, workforce development, and technology demonstration and validation. The document contains a survey of test and demonstration assets in New Mexico available for external users such as small businesses with security technologies under development. Demonstration and validation of national security technologies created by incubator sources, as well as other sources, are critical phases of technology development. The NSPP will support the utilization of an integrated demonstration and validation environment.

  17. BAYESIAN DEMONSTRATION TEST METHOD WITH MIXED BETA DISTRIBUTION

    Institute of Scientific and Technical Information of China (English)

    MING Zhimao; TAO Junyong; CHEN Xun; ZHANG Yunan

    2008-01-01

    A complex mechatronics system Bayesian plan of demonstration test is studied based on the mixed beta distribution. During product design and improvement various information is appropriately considered by introducing inheritance factor, moreover, the inheritance factor is thought as a random variable, and the Bayesian decision of the qualification test plan is obtained, and the correctness of a Bayesian model presented is verified. The results show that the quantity of the test is too conservative according to classical methods under small binomial samples. Although traditional Bayesian analysis can consider test information of related or similar products, it ignores differences between such products. The method has solved the above problem, furthermore, considering the requirement in many practical projects, the differences among this method, the classical method and Bayesian with beta distribution are compared according to the plan of reliability acceptance test.

  18. APU diaphragm testing. Test plan

    Science.gov (United States)

    Shelley, Richard

    1992-01-01

    Auxiliary Power Unit (APU) fuel (hydrazine) tanks have had to be removed from the Columbia Shuttle (OV-102) because they have been in service for 11 years, which is the limit of their useful life. As part of an effort to determine whether the useful life of the fuel tanks can be extended, examination of the ethylene propylene rubber (EPR) diaphragm and the metal from one of the APU tanks is required. The JSC Propulsion and Power Division has requested White Sands Test Facility (WSTF) to examine the EPR diaphragm thoroughly and the metal casing generally from one tank. The objective is to examine the EPR diaphragm for signs of degradation that may limit the life of its function in the APU propellant tank. The metal casing will also be examined for signs of surface corrosion.

  19. Ground test for vibration control demonstrator

    Science.gov (United States)

    Meyer, C.; Prodigue, J.; Broux, G.; Cantinaud, O.; Poussot-Vassal, C.

    2016-09-01

    In the objective of maximizing comfort in Falcon jets, Dassault Aviation is developing an innovative vibration control technology. Vibrations of the structure are measured at several locations and sent to a dedicated high performance vibration control computer. Control laws are implemented in this computer to analyse the vibrations in real time, and then elaborate orders sent to the existing control surfaces to counteract vibrations. After detailing the technology principles, this paper focuses on the vibration control ground demonstration that was performed by Dassault Aviation in May 2015 on Falcon 7X business jet. The goal of this test was to attenuate vibrations resulting from fixed forced excitation delivered by shakers. The ground test demonstrated the capability to implement an efficient closed-loop vibration control with a significant vibration level reduction and validated the vibration control law design methodology. This successful ground test was a prerequisite before the flight test demonstration that is now being prepared. This study has been partly supported by the JTI CleanSky SFWA-ITD.

  20. Monitored Geologic Repository Test Evaluation Plan

    Energy Technology Data Exchange (ETDEWEB)

    M.B. Skorska

    2002-01-02

    The Monitored Geologic Repository test & evaluation program will specify tests, demonstrations, examinations, and analyses, and describe procedures to conduct and document testing necessary to verify meeting Monitored Geologic Repository requirements for a safe and effective geologic repository for radioactive waste. This test program will provide assurance that the repository is performing as designed, and that the barriers perform as expected; it will also develop supporting documentation to support the licensing process and to demonstrate compliance with codes, standards, and regulations. This comprehensive program addresses all aspects of verification from the development of test requirements to the performance of tests and reporting of the test results. The ''Monitored Geologic Repository Test & Evaluation Plan'' provides a detailed description of the test program approach necessary to achieve the above test program objectives. This test plan incorporates a set of test phases focused on ensuring repository safety and operational readiness and implements a project-wide integrated product management team approach to facilitate test program planning, analysis, and implementation. The following sections provide a description of the individual test phases, the methodology for test program planning and analyses, and the management approach for implementing these activities.

  1. Heat pipe testing program test plan

    Energy Technology Data Exchange (ETDEWEB)

    Bienert, W.B.

    1980-03-14

    A test plan is given which describes the tests to be conducted on several typical solar receiver heat pipes. The hardware to be used, test fixtures and rationale of the test program are discussed. The program objective is to perform life testing under simulated receiver conditions, and to conduct performance tests with selected heat pipes to further map their performance, particularly with regard to their transient behavior. Performance requirements are defined. Test fixtures designed for the program are described in detail, and their capabilities for simulating the receiver conditions and their limitations are discussed. The heat pipe design is given. (LEW)

  2. High voltage testing for the MAJORANA DEMONSTRATOR

    Energy Technology Data Exchange (ETDEWEB)

    Abgrall, N. [Nuclear Science Division, Lawrence Berkeley National Laboratory, Berkeley, CA (United States); Arnquist, I.J. [Pacific Northwest National Laboratory, Richland, WA (United States); Avignone, F.T. [Department of Physics and Astronomy, University of South Carolina, Columbia, SC (United States); Oak Ridge National Laboratory, Oak Ridge, TN (United States); Barabash, A.S. [National Research Center “Kurchatov Institute” Institute for Theoretical and Experimental Physics, Moscow (Russian Federation); Bertrand, F.E. [Oak Ridge National Laboratory, Oak Ridge, TN (United States); Bradley, A.W. [Nuclear Science Division, Lawrence Berkeley National Laboratory, Berkeley, CA (United States); Brudanin, V. [Joint Institute for Nuclear Research, Dubna (Russian Federation); Busch, M. [Department of Physics, Duke University, Durham, NC (United States); Triangle Universities Nuclear Laboratory, Durham, NC (United States); Buuck, M. [Center for Experimental Nuclear Physics and Astrophysics, and Department of Physics, University of Washington, Seattle, WA (United States); Byram, D. [Department of Physics, University of South Dakota, Vermillion, SD (United States); Caldwell, A.S. [South Dakota School of Mines and Technology, Rapid City, SD (United States); Chan, Y-D. [Nuclear Science Division, Lawrence Berkeley National Laboratory, Berkeley, CA (United States); Christofferson, C.D. [South Dakota School of Mines and Technology, Rapid City, SD (United States); Chu, P.-H. [Los Alamos National Laboratory, Los Alamos, NM (United States); Cuesta, C., E-mail: ccuesta@uw.edu [Center for Experimental Nuclear Physics and Astrophysics, and Department of Physics, University of Washington, Seattle, WA (United States); Detwiler, J.A.; Doe, P.J. [Center for Experimental Nuclear Physics and Astrophysics, and Department of Physics, University of Washington, Seattle, WA (United States); and others

    2016-07-01

    The MAJORANA Collaboration is constructing the MAJORANA DEMONSTRATOR, an ultra-low background, 44-kg modular high-purity Ge (HPGe) detector array to search for neutrinoless double-beta decay in {sup 76}Ge. The phenomenon of surface micro-discharge induced by high-voltage has been studied in the context of the MAJORANA DEMONSTRATOR. This effect can damage the front-end electronics or mimic detector signals. To ensure the correct performance, every high-voltage cable and feedthrough must be capable of supplying HPGe detector operating voltages as high as 5 kV without exhibiting discharge. R&D measurements were carried out to understand the testing system and determine the optimum design configuration of the high-voltage path, including different improvements of the cable layout and feedthrough flange model selection. Every cable and feedthrough to be used at the MAJORANA DEMONSTRATOR was characterized and the micro-discharge effects during the MAJORANA DEMONSTRATOR commissioning phase were studied. A stable configuration has been achieved, and the cables and connectors can supply HPGe detector operating voltages without exhibiting discharge.

  3. High voltage testing for the MAJORANA Demonstrator

    CERN Document Server

    Abgrall, N; Avignone, F T; Barabash, A S; Bertrand, F E; Bradley, A W; Brudanin, V; Busch, M; Buuck, M; Byram, D; Caldwell, A S; Chan, Y-D; Christofferson, C D; Chu, P -H; Cuesta, C; Detwiler, J A; Doe, P J; Dunagan, C; Efremenko, Yu; Ejiri, H; Elliott, S R; Fu, Z; Galindo-Uribarri, A; Giovanetti, G K; Goett, J; Green, M P; Gruszko, J; Guinn, I S; Guiseppe, V E; Henning, R; Hoppe, E W; Howard, S; Howe, M A; Jasinski, B R; Keeter, K J; Kidd, M F; Konovalov, S I; Kouzes, R T; LaFerriere, B D; Leon, J; Li, A; MacMullin, J; Martin, R D; Massarczyk, R; Meijer, S J; Mertens, S; Orrell, J L; O'Shaughnessy, C; Poon, A W P; Radford, D C; Rager, J; Rielage, K; Robertson, R G H; Romero-Romero, E; Shanks, B; Shirchenko, M; Snyder, N; Suriano, A M; Tedeschi, D; Thompson, A; Ton, K T; Trimble, J E; Varner, R L; Vasilyev, S; Vetter, K; Vorren, K; White, B R; Wilkerson, J F; Wiseman, C; Xu, W; Yakushev, E; Yu, C -H; Yumatov, V

    2016-01-01

    The MAJORANA Collaboration is constructing the MAJORANA Demonstrator, an ultra-low background, 44-kg modular high-purity Ge (HPGe) detector array to search for neutrinoless double-beta decay in Ge-76. The phenomenon of surface micro-discharge induced by high-voltage has been studied in the context of the MAJORANA Demonstrator. This eff?ect can damage the front-end electronics or mimic detector signals. To ensure the correct performance, every high-voltage cable and feedthrough must be capable of supplying HPGe detector operating voltages as high as 5 kV without exhibiting discharge. R&D measurements were carried out to understand the testing system and determine the optimum design configuration of the high-voltage path, including diff?erent improvements of the cable layout and feedthrough flange model selection. Every cable and feedthrough to be used at the MAJORANA Demonstrator was characterized and the micro-discharge eff?ects during the MAJORANA Demonstrator commissioning phase were studied. A stable c...

  4. High voltage testing for the MAJORANA DEMONSTRATOR

    Science.gov (United States)

    Abgrall, N.; Arnquist, I. J.; Avignone, F. T.; Barabash, A. S.; Bertrand, F. E.; Bradley, A. W.; Brudanin, V.; Busch, M.; Buuck, M.; Byram, D.; Caldwell, A. S.; Chan, Y.-D.; Christofferson, C. D.; Chu, P.-H.; Cuesta, C.; Detwiler, J. A.; Doe, P. J.; Dunagan, C.; Efremenko, Yu.; Ejiri, H.; Elliott, S. R.; Fu, Z.; Galindo-Uribarri, A.; Giovanetti, G. K.; Goett, J.; Green, M. P.; Gruszko, J.; Guinn, I. S.; Guiseppe, V. E.; Henning, R.; Hoppe, E. W.; Howard, S.; Howe, M. A.; Jasinski, B. R.; Keeter, K. J.; Kidd, M. F.; Konovalov, S. I.; Kouzes, R. T.; LaFerriere, B. D.; Leon, J.; Li, A.; MacMullin, J.; Martin, R. D.; Massarczyk, R.; Meijer, S. J.; Mertens, S.; Orrell, J. L.; O'Shaughnessy, C.; Poon, A. W. P.; Radford, D. C.; Rager, J.; Rielage, K.; Robertson, R. G. H.; Romero-Romero, E.; Shanks, B.; Shirchenko, M.; Snyder, N.; Suriano, A. M.; Tedeschi, D.; Thompson, A.; Ton, K. T.; Trimble, J. E.; Varner, R. L.; Vasilyev, S.; Vetter, K.; Vorren, K.; White, B. R.; Wilkerson, J. F.; Wiseman, C.; Xu, W.; Yakushev, E.; Yu, C.-H.; Yumatov, V.

    2016-07-01

    The MAJORANA Collaboration is constructing the MAJORANA DEMONSTRATOR, an ultra-low background, 44-kg modular high-purity Ge (HPGe) detector array to search for neutrinoless double-beta decay in 76Ge. The phenomenon of surface micro-discharge induced by high-voltage has been studied in the context of the MAJORANA DEMONSTRATOR. This effect can damage the front-end electronics or mimic detector signals. To ensure the correct performance, every high-voltage cable and feedthrough must be capable of supplying HPGe detector operating voltages as high as 5 kV without exhibiting discharge. R&D measurements were carried out to understand the testing system and determine the optimum design configuration of the high-voltage path, including different improvements of the cable layout and feedthrough flange model selection. Every cable and feedthrough to be used at the MAJORANA DEMONSTRATOR was characterized and the micro-discharge effects during the MAJORANA DEMONSTRATOR commissioning phase were studied. A stable configuration has been achieved, and the cables and connectors can supply HPGe detector operating voltages without exhibiting discharge.

  5. High voltage testing for the Majorana Demonstrator

    Energy Technology Data Exchange (ETDEWEB)

    Abgrall, N.; Arnquist, Isaac J.; Avignone, F. T.; Barabash, A.; Bertrand, F.; Bradley, A. W.; Brudanin, V.; Busch, Matthew; Buuck, M.; Byram, D.; Caldwell, A. S.; Chan, Yuen-Dat; Christofferson, C. D.; Chu, Pamela M.; Cuesta, C.; Detwiler, Jason A.; Doe, P. J.; Dunagan, C.; Efremenko, Yuri; Ejiri, H.; Elliott, S. R.; Fu, Z.; Galindo-Uribarri, A.; Giovanetti, G. K.; Goett, J.; Green, M. P.; Gruszko, J.; Guinn, I.; Guiseppe, V. E.; Henning, R.; Hoppe, Eric W.; Howard, S.; Howe, M. A.; Jasinski, B. R.; Keeter, K.; Kidd, M. F.; Konovalov, S.; Kouzes, Richard T.; Laferriere, Brian D.; Leon, Jonathan D.; Li, Alexander D.; MacMullin, J.; Martin, R. D.; Massarcyk, R.; Meijer, S. J.; Mertens, S.; Orrell, John L.; O' Shaughnessy, C.; Poon, Alan W.; Radford, D. C.; Rager, J.; Rielage, Keith; Robertson, R. G. H.; Romero Romo, M.; Shanks, B.; Shirchenko, M.; Snyder, N.; Suriano, Anne-Marie E.; Tedeschi, D.; Thompson, Andrew; Ton, K. T.; Trimble, J. E.; Varner, R. L.; Vasilyev, Sergey; Vetter, Kai; Vorren, Kris R.; White, Brandon R.; Wilkerson, J. F.; Wiseman, C.; Xu, W.; Yakushev, E.; Yu, Chang-Hong; Yumatov, V.

    2016-07-01

    The Majorana Collaboration is constructing theMajorana Demonstrator, an ultra-low background, 44-kg modular high-purity Ge (HPGe) detector array to search for neutrinoless double-beta decay in 76Ge. The phenomenon of surface micro-discharge induced by high-voltage has been studied in the context of theMajorana Demonstrator. This effect can damage the front-end electronics or mimic detector signals. To ensure the correct performance, every high-voltage cable and feedthrough must be capable of supplying HPGe detector operating voltages as high as 5 kV without exhibiting discharge. R&D measurements were carried out to understand the testing system and determine the optimum design configuration of the high-voltage path, including different improvements of the cable layout and feedthrough flange model selection. Every cable and feedthrough to be used at the Majorana Demonstrator was characterized and the micro-discharge effects during theMajorana Demonstrator commissioning phase were studied. A stable configuration has been achieved, and the cables and connectors can supply HPGe detector operating voltages without exhibiting discharge.

  6. Biodiesel Test Plan

    Science.gov (United States)

    2014-07-01

    toxic replacement is most often made from soybean oil through a process called transesterfication, whereby it is mixed with methanol to produce both soy...vegeta b le oils or animal fats , for use in compression-ignition (diesel) engines. This specification is For pure (100%) biodiesel prior to use or...field testing, provided no safety concerns or major issues are discovered. The BUSL engines and fuel system will be prepared and modified to ensure

  7. Vendor System Vulnerability Testing Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    James R. Davidson

    2005-01-01

    The Idaho National Laboratory (INL) prepared this generic test plan to provide clients (vendors, end users, program sponsors, etc.) with a sense of the scope and depth of vulnerability testing performed at the INL’s Supervisory Control and Data Acquisition (SCADA) Test Bed and to serve as an example of such a plan. Although this test plan specifically addresses vulnerability testing of systems applied to the energy sector (electric/power transmission and distribution and oil and gas systems), it is generic enough to be applied to control systems used in other critical infrastructures such as the transportation sector, water/waste water sector, or hazardous chemical production facilities. The SCADA Test Bed is established at the INL as a testing environment to evaluate the security vulnerabilities of SCADA systems, energy management systems (EMS), and distributed control systems. It now supports multiple programs sponsored by the U.S. Department of Energy, the U.S. Department of Homeland Security, other government agencies, and private sector clients. This particular test plan applies to testing conducted on a SCADA/EMS provided by a vendor. Before performing detailed vulnerability testing of a SCADA/EMS, an as delivered baseline examination of the system is conducted, to establish a starting point for all-subsequent testing. The series of baseline tests document factory delivered defaults, system configuration, and potential configuration changes to aid in the development of a security plan for in depth vulnerability testing. The baseline test document is provided to the System Provider,a who evaluates the baseline report and provides recommendations to the system configuration to enhance the security profile of the baseline system. Vulnerability testing is then conducted at the SCADA Test Bed, which provides an in-depth security analysis of the Vendor’s system.b a. The term System Provider replaces the name of the company/organization providing the system

  8. Arc melter demonstration baseline test results

    Energy Technology Data Exchange (ETDEWEB)

    Soelberg, N.R.; Chambers, A.G.; Anderson, G.L.; Oden, L.L.; O`Connor, W.K.; Turner, P.C.

    1994-07-01

    This report describes the test results and evaluation for the Phase 1 (baseline) arc melter vitrification test series conducted for the Buried Waste Integrated Demonstration program (BWID). Phase 1 tests were conducted on surrogate mixtures of as-incinerated wastes and soil. Some buried wastes, soils, and stored wastes at the INEL and other DOE sites, are contaminated with transuranic (TRU) radionuclides and hazardous organics and metals. The high temperature environment in an electric arc furnace may be used to process these wastes to produce materials suitable for final disposal. An electric arc furnace system can treat heterogeneous wastes and contaminated soils by (a) dissolving and retaining TRU elements and selected toxic metals as oxides in the slag phase, (b) destroying organic materials by dissociation, pyrolyzation, and combustion, and (c) capturing separated volatilized metals in the offgas system for further treatment. Structural metals in the waste may be melted and tapped separately for recycle or disposal, or these metals may be oxidized and dissolved into the slag. The molten slag, after cooling, will provide a glass/ceramic final waste form that is homogeneous, highly nonleachable, and extremely durable. These features make this waste form suitable for immobilization of TRU radionuclides and toxic metals for geologic timeframes. Further, the volume of contaminated wastes and soils will be substantially reduced in the process.

  9. 30 CFR 282.23 - Testing Plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Testing Plan. 282.23 Section 282.23 Mineral... § 282.23 Testing Plan. All testing activities shall be conducted in accordance with a Testing Plan... detailed Mining Plan than is obtainable under an approved Delineation Plan, to prepare feasibility...

  10. Wave Energy Research, Testing and Demonstration Center

    Energy Technology Data Exchange (ETDEWEB)

    Batten, Belinda [Oregon State Univ., Corvallis, OR (United States)

    2014-09-30

    The purpose of this project was to build upon the research, development and testing experience of the Northwest National Marine Renewable Energy Center (NNMREC) to establish a non-grid connected open-ocean testing facility for wave energy converters (WECs) off the coast of Newport, Oregon. The test facility would serve as the first facility of its kind in the continental US with a fully energetic wave resource where WEC technologies could be proven for west coast US markets. The test facility would provide the opportunity for self-contained WEC testing or WEC testing connected via an umbilical cable to a mobile ocean test berth (MOTB). The MOTB would act as a “grid surrogate” measuring energy produced by the WEC and the environmental conditions under which the energy was produced. In order to realize this vision, the ocean site would need to be identified through outreach to community stakeholders, and then regulatory and permitting processes would be undertaken. Part of those processes would require environmental baseline studies and site analysis, including benthic, acoustic and wave resource characterization. The MOTB and its myriad systems would need to be designed and constructed.The first WEC test at the facility with the MOTB was completed within this project with the WET-NZ device in summer 2012. In summer 2013, the MOTB was deployed with load cells on its mooring lines to characterize forces on mooring systems in a variety of sea states. Throughout both testing seasons, studies were done to analyze environmental effects during testing operations. Test protocols and best management practices for open ocean operations were developed. As a result of this project, the non-grid connected fully energetic WEC test facility is operational, and the MOTB system developed provides a portable concept for WEC testing. The permitting process used provides a model for other wave energy projects, especially those in the Pacific Northwest that have similar

  11. NASA's Plan for SDLS Testing

    Science.gov (United States)

    Bailey, Brandon

    2015-01-01

    The Space Data Link Security (SDLS) Protocol is a Consultative Committee for Space Data Systems (CCSDS) standard which extends the known Data Link protocols to secure data being sent over a space link by providing confidentiality and integrity services. This plan outlines the approach by National Aeronautics Space Administration (NASA) in performing testing of the SDLS protocol using a prototype based on an existing NASA missions simulator.

  12. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    Energy Technology Data Exchange (ETDEWEB)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow when filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.

  13. First testing of the CALIFA Barrel Demonstrator

    Science.gov (United States)

    Pietras, B.; Winkel, M.; Alvarez-Pol, H.; Bendel, M.; Casarejos, E.; Cederkäll, J.; Cortina-Gil, D.; Fernandez, G.; Gernhäuser, R.; Golubev, P.; González, D.; Hartig, A.; Izquierdo, P.; Klenze, P.; Le Bleis, T.; Nácher, E.; Perea, A.; Remmels, P.; Ribeiro, G.; Teubig, P.; Vilan, J.; Yañez, P.

    2016-04-01

    Advancement of the CALIFA calorimeter project has reached a new milestone with the construction of the first modules of the CALIFA Demonstrator, ultimately to be integrated into the final calorimeter. Aspects and methods of detector optimisation will be discussed, along with characterisation using proton beams of 70 caesium iodide quenching over the available proton energy range has been performed, to accompany a method for proton calibration scaled from the measured gamma-ray energies.

  14. Performance Demonstration Program Plan for Analysis of Simulated Headspace Gases

    Energy Technology Data Exchange (ETDEWEB)

    Carlsbad Field Office

    2007-11-13

    The Performance Demonstration Program (PDP) for headspace gases distributes blind audit samples in a gas matrix for analysis of volatile organic compounds (VOCs). Participating measurement facilities (i.e., fixed laboratories, mobile analysis systems, and on-line analytical systems) are located across the United States. Each sample distribution is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD) (DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department (NMED). The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the Headspace Gas (HSG) PDP. Participating measurement facilities analyze blind audit samples of simulated TRU waste package headspace gases according to the criteria set by this PDP Plan. Blind audit samples (hereafter referred to as PDP samples) are used as an independent means to assess each measurement facility’s compliance with the WAP quality assurance objectives (QAOs). To the extent possible, the concentrations of VOC analytes in the PDP samples encompass the range of concentrations anticipated in actual TRU waste package headspace gas samples. Analyses of headspace gases are required by the WIPP to demonstrate compliance with regulatory requirements. These analyses must be performed by measurement facilities that have demonstrated acceptable performance in this PDP. These analyses are referred to as WIPP analyses and the TRU waste package headspace gas samples on which they are performed are referred to as WIPP samples in this document

  15. Performance Demonstration Program Plan for Analysis of Simulated Headspace Gases

    Energy Technology Data Exchange (ETDEWEB)

    Carlsbad Field Office

    2007-11-19

    The Performance Demonstration Program (PDP) for headspace gases distributes blind audit samples in a gas matrix for analysis of volatile organic compounds (VOCs). Participating measurement facilities (i.e., fixed laboratories, mobile analysis systems, and on-line analytical systems) are located across the United States. Each sample distribution is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD) (DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department (NMED). The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the Headspace Gas (HSG) PDP. Participating measurement facilities analyze blind audit samples of simulated TRU waste package headspace gases according to the criteria set by this PDP Plan. Blind audit samples (hereafter referred to as PDP samples) are used as an independent means to assess each measurement facility’s compliance with the WAP quality assurance objectives (QAOs). To the extent possible, the concentrations of VOC analytes in the PDP samples encompass the range of concentrations anticipated in actual TRU waste package headspace gas samples. Analyses of headspace gases are required by the WIPP to demonstrate compliance with regulatory requirements. These analyses must be performed by measurement facilities that have demonstrated acceptable performance in this PDP. These analyses are referred to as WIPP analyses and the TRU waste package headspace gas samples on which they are performed are referred to as WIPP samples in this document

  16. Plutonium Speciation in Support of Oxidative-Leaching Demonstration Test

    Energy Technology Data Exchange (ETDEWEB)

    Sinkov, Sergey I.

    2007-10-31

    Bechtel National, Inc. (BNI) is evaluating the plutonium speciation in caustic solutions that reasonably represent the process streams from the oxidative-leaching demonstration test. Battelle—Pacific Northwest Division (PNWD) was contracted to develop a spectrophotometric method to measure plutonium speciation at submicromolar (< 10-6 M) concentrations in alkaline solutions in the presence of chromate and carbonate. Data obtained from the testing will be used to identify the oxidation state of Pu(IV), Pu(V), and Pu(VI) species, which potentially could exist in caustic leachates. Work was initially conducted under contract number 24590-101-TSA-W000-00004 satisfying the needs defined in Appendix C of the Research and Technology Plan TSS A-219 to evaluate the speciation of chromium, plutonium, and manganese before and after oxidative leaching. In February 2007, the contract mechanism was switched to Pacific Northwest National Laboratory (PNNL) Operating Contract MOA: 24590-QL-HC9-WA49-00001.

  17. Test Plan - Solids Accumulation Scouting Studies

    Energy Technology Data Exchange (ETDEWEB)

    Duignan, M. R.; Steeper, T. J.; Steimke, J. L.; Fowley, M. D.

    2012-05-10

    This plan documents the highlights of the Solids Accumulations Scouting Studies test; a project, from Washington River Protection Solutions (WRPS), that began on February 1, 2012. During the last 12 weeks considerable progress has been made to design and plan methods that will be used to estimate the concentration and distribution of heavy fissile solids in accumulated solids in the Hanford double-shell tank (DST) 241-AW-105 (AW-105), which is the primary goal of this task. This DST will be one of the several waste feed delivery staging tanks designated to feed the Pretreatment Facility (PTF) of the Waste Treatment and Immobilization Plant (WTP). Note that over the length of the waste feed delivery mission AW-105 is currently identified as having the most fill empty cycles of any DST feed tanks, which is the reason for modeling this particular tank. At SRNL an existing test facility, the Mixing Demonstration Tank, which will be modified for the present work, will use stainless steel particles in a simulant that represents Hanford waste to perform mock staging tanks transfers that will allow solids to accumulate in the tank heel. The concentration and location of the mock fissile particles will be measured in these scoping studies to produce information that will be used to better plan larger scaled tests. Included in these studies is a secondary goal of developing measurement methods to accomplish the primary goal. These methods will be evaluated for use in the larger scale experiments. Included in this plan are the several pretest activities that will validate the measurement techniques that are currently in various phases of construction. Aspects of each technique, e.g., particle separations, volume determinations, topographical mapping, and core sampling, have been tested in bench-top trials, as discussed herein, but the actual equipment to be employed during the full test will need evaluation after fabrication and integration into the test facility.

  18. Industrial Fuel Gas Demonstration Plant Program. Demonstration plant operation plan (Deliverable No. 38)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    The Demo Plant Operating Plan is composed of the following sequence of events starting with the training or personnel, familiarizing of the personnel with the plant and completing the long-term run in the following sequences: inspection during construction, plant completion, shakedown of equipment, process unit startup, shakedown of process units, variable run operation and a turnaround. During the construction period, technical personnel from DRC, MLGW and IGT will be at the plant site becoming familiar with the equipment, its installation and all of the auxiliaries so that on completion of construction they will be well grounded on the plant detail and its configuration. At the same time the supervisory operating personnel will have hands on training the gasifier operation at the IGT pilot plant to develop a field for gasifier operation. As a plant sections are completed, they will be checked out in accordance with the contractor and operator (client) procedure as outlined. Subsequent to this, various vendor designs and furnished equipment will be checked out operating-wise and a performance test run if feasible. The actual startup of the plant will be subsequential with the support areas as utilities, coal handling and waste treatment being placed in operation first. Subsequent to this the process units will be placed in operation starting from the rear of the process train and working forward. Thus the downstream units will be operating before the reactor is run on coal. The reactor will be checked out on coke operation.

  19. Teaching Hypothesis Testing by Debunking a Demonstration of Telepathy.

    Science.gov (United States)

    Bates, John A.

    1991-01-01

    Discusses a lesson designed to demonstrate hypothesis testing to introductory college psychology students. Explains that a psychology instructor demonstrated apparent psychic abilities to students. Reports that students attempted to explain the instructor's demonstrations through hypothesis testing and revision. Provides instructions on performing…

  20. Treatability Test Plan for an In Situ Biostimulation Reducing Barrier

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J.; Vermeul, Vince R.; Long, Philip E.; Brockman, Fred J.; Oostrom, Mart; Hubbard, Susan; Borden, Robert C.; Fruchter, Jonathan S.

    2007-07-21

    This treatability test plan supports a new, integrated strategy to accelerate cleanup of chromium in the Hanford 100 Areas. This plan includes performing a field-scale treatability test for bioreduction of chromate, nitrate, and dissolved oxygen. In addition to remediating a portion of the plume and demonstrating reduction of electron acceptors in the plume, the data from this test will be valuable for designing a full-scale bioremediation system to apply at this and other chromium plumes at Hanford.

  1. STUDENT PLANNING TIME IN ORAL TESTS

    Institute of Scientific and Technical Information of China (English)

    WangLei

    2004-01-01

    This paper describes the process of planning in an oral test situation. Since many researchers have studied the impact of pretask planning in the Second Language Acquisition (SLA) field and some have explored the same subject into the area of oral tests, the present study tries to make a tentative attempt to see what the test takers are actually doing in the planning time while taking an oral test. A questionnaire was designed with the effort to find out whether planning time results in an increased focus on form, particularly at the level of strategic attention to form.The result of the investigation tells us that restricted by the type of situation, test takers can only plan the framework of what they are going to say, which may differ to the results achieved by previous studies.

  2. 10 CFR 1021.212 - Research, development, demonstration, and testing.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Research, development, demonstration, and testing. 1021... ACT IMPLEMENTING PROCEDURES DOE Decisionmaking § 1021.212 Research, development, demonstration, and testing. (a) This section applies to the adoption and application of programs that involve research...

  3. Phase 1 Final status survey plan for the West Valley demonstration project.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R. L. (Environmental Science Division)

    2011-05-31

    This plan provides the technical basis and associated protocols to support Phase 1 final status survey (FSS) data collection and interpretation as part of the West Valley Demonstration Project Phase 1 Decommissioning Plan process. This plan is consistent with the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). The Phase 1 Decommissioning Plan provides the relevant derived concentration guideline levels (DCGLs) for the Phase 1 radionuclides of interest. This plan includes protocols that will be applied to the deep excavations planned for Waste Management Area (WMA) 1 and WMA 2, for surface soils outside the WMA 1 and WMA 2 excavations that do not have contamination impacts at depths greater than one meter, and for areas that are used for Phase 1 contaminated soil lay-down purposes. All excavated and lay-down areas will be classified as MARSSIM Class 1 areas. Surface soils that have not been excavated, are not expected to exceed DCGLs, and do not have contamination impacts at depths greater than one meter will be divided into either Class 1 or Class 2 areas depending on the expected potential for surface soil contamination in those areas. The plan uses gamma scans combined with biased soil samples to address DCGLemc concerns. The plan uses systematic soil sampling combined with area factors to address DCGLw and DCGLemc concerns. The Sign test will be used to statistically evaluate DCGLw compliance. If the results from the characterization sampling and analysis plan (CSAP) data collection indicate that background may be a significant issue for Sign test implementation, the Wilcoxon rank sum (WRS) test will be used instead to demonstrate DCGLw compliance. A reference area will be selected on the basis of CSAP data results if the WRS test becomes a necessity. The WMA 1 excavation footprint includes approximately 476 foundation pilings that will be trimmed and left in place. Piling-specific systematic and biased sampling will be conducted to

  4. Test Plan for WEPTOS #1

    DEFF Research Database (Denmark)

    Margheritini, Lucia; Tetu, Amélie; Ferri, Francesco

    This report presents the test program for the WEPTOS Prototype in Brandsø and should be used during testing in order to prioritize and implement the selected configurations to be tested in the available time frame. One configuration is characterized by a defined combination of device opening angl...

  5. Strategic Energy Planning for Renewable Energy Demonstration Center

    Energy Technology Data Exchange (ETDEWEB)

    Ross, Becky [Cabazon Band of Mission Indians; Crandell, George

    2014-04-10

    The focus of this project is to support the addition of renewable energy technologies to the existing CBMI resource recovery park, known as the Cabazon Resource Recovery Park (CRRP) in Mecca, California. The concept approved for this project was to determine if the resources and the needs existed for the addition of a Renewable Energy Demonstration Center (REDC) at the CRRP. The REDC concept is envisioned to support the need of startup renewable companies for a demonstration site that reduces their development costs.

  6. Antenna Test Facility (ATF): User Test Planning Guide

    Science.gov (United States)

    Lin, Greg

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  7. Vibration and Acoustic Test Facility (VATF): User Test Planning Guide

    Science.gov (United States)

    Fantasia, Peter M.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the VATF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  8. Advanced Seismic Probabilistic Risk Assessment Demonstration Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Coleman, Justin [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    Idaho National Laboratories (INL) has an ongoing research and development (R&D) project to remove excess conservatism from seismic probabilistic risk assessments (SPRA) calculations. These risk calculations should focus on providing best estimate results, and associated insights, for evaluation and decision-making. This report presents a plan for improving our current traditional SPRA process using a seismic event recorded at a nuclear power plant site, with known outcomes, to improve the decision making process. SPRAs are intended to provide best estimates of the various combinations of structural and equipment failures that can lead to a seismic induced core damage event. However, in general this approach has been conservative, and potentially masks other important events (for instance, it was not the seismic motions that caused the Fukushima core melt events, but the tsunami ingress into the facility).

  9. West Valley Demonstration Project: Public information plan: Objectives, 1988

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, W. D.

    1987-09-30

    This report describes the objectives and proposed activities of the public information program. Included are statements of purpose, goals, approach, and methods of implementation. This office deals with local, state, and federal agencies to inform them on the status of this demonstration project. (TEM)

  10. Geothermal drill pipe corrosion test plan

    Energy Technology Data Exchange (ETDEWEB)

    Caskey, B.C.; Copass, K.S.

    1980-12-01

    Plans are presented for conducting a field test of drill pipe corrosion, comparing air and nitrogen as drilling fluids. This test will provide data for evaluating the potential of reducing geothermal well drilling costs by extending drill pipe life and reducing corrosion control costs. The 10-day test will take place during fall 1980 at the Baca Location in Sandoval County, New Mexico.

  11. Industrial Fuel Gas Demonstration Plant Program. Task III, Demonstration plant safety, industrial hygiene, and major disaster plan (Deliverable No. 35)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-03-01

    This Health and Safety Plan has been adopted by the IFG Demonstration Plant managed by Memphis Light, Gas and Water at Memphis, Tennessee. The plan encompasses the following areas of concern: Safety Plan Administration, Industrial Health, Industrial Safety, First Aid, Fire Protection (including fire prevention and control), and Control of Safety Related Losses. The primary objective of this plan is to achieve adequate control of all potentially hazardous activities to assure the health and safety of all employees and eliminate lost work time to both the employees and the company. The second objective is to achieve compliance with all Federal, state and local laws, regulations and codes. Some thirty specific safe practice instruction items are included.

  12. Emperical Tests of Acceptance Sampling Plans

    Science.gov (United States)

    White, K. Preston, Jr.; Johnson, Kenneth L.

    2012-01-01

    Acceptance sampling is a quality control procedure applied as an alternative to 100% inspection. A random sample of items is drawn from a lot to determine the fraction of items which have a required quality characteristic. Both the number of items to be inspected and the criterion for determining conformance of the lot to the requirement are given by an appropriate sampling plan with specified risks of Type I and Type II sampling errors. In this paper, we present the results of empirical tests of the accuracy of selected sampling plans reported in the literature. These plans are for measureable quality characteristics which are known have either binomial, exponential, normal, gamma, Weibull, inverse Gaussian, or Poisson distributions. In the main, results support the accepted wisdom that variables acceptance plans are superior to attributes (binomial) acceptance plans, in the sense that these provide comparable protection against risks at reduced sampling cost. For the Gaussian and Weibull plans, however, there are ranges of the shape parameters for which the required sample sizes are in fact larger than the corresponding attributes plans, dramatically so for instances of large skew. Tests further confirm that the published inverse-Gaussian (IG) plan is flawed, as reported by White and Johnson (2011).

  13. A Fault Sample Simulation Approach for Virtual Testability Demonstration Test

    Institute of Scientific and Technical Information of China (English)

    ZHANG Yong; QIU Jing; LIU Guanjun; YANG Peng

    2012-01-01

    Virtual testability demonstration test has many advantages,such as low cost,high efficiency,low risk and few restrictions.It brings new requirements to the fault sample generation.A fault sample simulation approach for virtual testability demonstration test based on stochastic process theory is proposed.First,the similarities and differences of fault sample generation between physical testability demonstration test and virtual testability demonstration test are discussed.Second,it is pointed out that the fault occurrence process subject to perfect repair is renewal process.Third,the interarrival time distribution function of the next fault event is given.Steps and flowcharts of fault sample generation are introduced.The number of faults and their occurrence time are obtained by statistical simulation.Finally,experiments are carried out on a stable tracking platform.Because a variety of types of life distributions and maintenance modes are considered and some assumptions are removed,the sample size and structure of fault sample simulation results are more similar to the actual results and more reasonable.The proposed method can effectively guide the fault injection in virtual testability demonstration test.

  14. Alternate retrieval technology demonstrations program - test report (ARD Environmental, Inc.)

    Energy Technology Data Exchange (ETDEWEB)

    Berglin, E.J.

    1997-07-31

    A prototype vehicle, control system, and waste and water scavenging system were designed and fabricated with essentially the full capabilities of the vehicle system proposed by ARD Environmental. A test tank mockup, including riser and decontamination chamber were designed and fabricated, and approximately 830 cubic feet of six varieties of waste simulants poured. The tests were performed by ARD Environmental personnel at its site in Laurel, Maryland, from 4/22/97 through 5/2/97. The capabilities tested were deployment and retrieval, extended mobility and productivity, the ability to operate the system using video viewing only, retrieval after simulated failure, and retrieval and decontamination. Testing commenced with deployment of the vehicle into the tank. Deployment was accomplished using a crane and auxiliary winch to position the vehicle and lower it through the decontamination chamber, into the 36`` diameter x 6` high riser, and touch down on the waste field in the tank. The initial mobility tests were conducted immediately after deployment, prior to sluicing, as the waste field exhibited the greatest amount of variation at this time. This test demonstrated the ability of the vehicle to maneuver over the simulated waste field, and the ability of the operator to work with only video viewing available. In addition, the ability of the vehicle to right itself after being turned on its side was demonstrated. The production rate was evaluated daily through the testing period by measuring the surface and estimating the amount of material removed. The test demonstrated the ability of the vehicle to reduce the waste surface using 400 psi (nominal) water jets, scavenge water and material from the work area, and move to any location, even in the relatively confined space of the 20` diameter test tank. In addition, the ability to sluice to a remote scavenging module was demonstrated. The failure mode test demonstrated the ability to retrieve a stuck vehicle by pulling

  15. Advanced Materials Laboratory User Test Planning Guide

    Science.gov (United States)

    Orndoff, Evelyne

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the Advanced Materials Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  16. Post Irradiation Examination Plan for High-Burnup Demonstration Project Sister Rods

    Energy Technology Data Exchange (ETDEWEB)

    Scaglione, John M [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Montgomery, Rose [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bevard, Bruce Balkcom [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2016-04-01

    This test plan describes the experimental work to be implemented by the U.S. Department of Energy (DOE) Office of Nuclear Energy (NE) to characterize high burnup (HBU) spent nuclear fuel (SNF) in conjunction with the High Burnup Dry Storage Cask Research and Development Project and serves to coordinate and integrate the multi-year experimental program to collect and develop data regarding the continued storage and eventual transport of HBU (i.e., >45 GWd/MTU) SNF. The work scope involves the development, performance, technical integration, and oversight of measurements and collection of relevant data, guided by analyses and demonstration of need.

  17. Overview of the solar dynamic ground test demonstration program

    Science.gov (United States)

    Shaltens, Richard K.; Boyle, Robert V.

    1993-01-01

    The Solar Dynamic (SD) Ground Test Demonstration (GTD) program demonstrates the availability of SD technologies in a simulated space environment at the NASA Lewis Research Center (LeRC) vacuum facility. An aerospace industry/ government team is working together to design, fabricate, build, and test a complete SD system. This paper reviews the goals and status of the SD GTD program. A description of the SD system includes key design features of the system, subsystems, and components as reported at the Critical Design Review (CDR).

  18. Treatability Test Plan for an In Situ Biostimulation Reducing Barrier

    Energy Technology Data Exchange (ETDEWEB)

    Truex, Michael J.; Vermeul, Vince R.; Long, Philip E.; Brockman, Fred J.; Oostrom, Mart; Hubbard, Susan; Borden, Robert C.; Fruchter, Jonathan S.

    2007-10-26

    This treatability test plan supports a new, integrated strategy to accelerate cleanup of chromium in the 100 Areas at the Hanford Site. This plan includes performing a field-scale treatability test for bioreduction of chromate, nitrate, and dissolved oxygen. In addition to remediating a portion of the plume and demonstrating reduction of electron acceptors in the plume, the data from this test will be valuable for designing a full-scale bioremediation system to apply at this and other chromium plumes at the Hanford Site.

  19. Photovoltaic Test and Demonstration Project. [for solar cell power systems

    Science.gov (United States)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The Photovoltaic Test and Demonstration Project was initiated by NASA in June, 1975, to develop economically feasible photovoltaic power systems suitable for a variety of terrestrial applications. Objectives include the determination of operating characteristic and lifetimes of a variety of solar cell systems and components and development of methodology and techniques for accurate measurements of solar cell and array performance and diagnostic measurements for solar power systems. Initial work will be concerned with residential applications, with testing of the first prototype system scheduled for June, 1976. An outdoor 10 kW array for testing solar power systems is under construction.

  20. Photovoltaic test and demonstration project. [residential energy program

    Science.gov (United States)

    Forestieri, A. F.; Brandhorst, H. W., Jr.; Deyo, J. N.

    1976-01-01

    The considered project consists of three subprojects related to applications, device performance and diagnostics, and endurance testing. The objectives of the applications subproject include the determination of the operating characteristics for a variety of photovoltaic conversion systems. A system test facility is being constructed in this connection and a prototype residence experiment is to be conducted. Market demand for solar cells is to be stimulated by demonstrating suitability of solar cells for specific near-term applications. Activities conducted in connection with device performance studies and diagnostics are also discussed along with developments in the area of endurance testing.

  1. Graphite electrode arc melter demonstration Phase 2 test results

    Energy Technology Data Exchange (ETDEWEB)

    Soelberg, N.R.; Chambers, A.G.; Anderson, G.L.; O`Connor, W.K.; Oden, L.L.; Turner, P.C.

    1996-06-01

    Several U.S. Department of Energy organizations and the U.S. Bureau of Mines have been collaboratively conducting mixed waste treatment process demonstration testing on the near full-scale graphite electrode submerged arc melter system at the Bureau`s Albany (Oregon) Research Center. An initial test series successfully demonstrated arc melter capability for treating surrogate incinerator ash of buried mixed wastes with soil. The conceptual treatment process for that test series assumed that buried waste would be retrieved and incinerated, and that the incinerator ash would be vitrified in an arc melter. This report presents results from a recently completed second series of tests, undertaken to determine the ability of the arc melter system to stably process a wide range of {open_quotes}as-received{close_quotes} heterogeneous solid mixed wastes containing high levels of organics, representative of the wastes buried and stored at the Idaho National Engineering Laboratory (INEL). The Phase 2 demonstration test results indicate that an arc melter system is capable of directly processing these wastes and could enable elimination of an up-front incineration step in the conceptual treatment process.

  2. Basalt near-surface test facility test plans

    Energy Technology Data Exchange (ETDEWEB)

    Krug, A.D.

    1979-06-01

    The NSTF is under construction at Gable Mountain for in-situ testing, which will be conducted in two phases: Phase I, using electric heaters to simulate nuclear waste canisters in order to study the thermomechanical response of basalt; and Phase II, using spent fuel canisters. The tests planned for Phases I and II are described. (DLC)

  3. ORNL/IAT ARMATURE DIAGNOSTICS DEMONSTRATION TEST REPORT: PART TWO: BENCH DEMONSTRATION

    Energy Technology Data Exchange (ETDEWEB)

    Allison, Stephen W [ORNL; Cates, Michael R [ORNL; Goedeke, Shawn [ORNL; Crawford, M. T. [Institute for Advanced Technology, Austin, TX; Ferraro, S. B. [Institute for Advanced Technology, Austin, TX; Surls, D. [Institute for Advanced Technology, Austin, TX; Stewart, J. [Institute for Advanced Technology, Austin, TX

    2005-12-01

    The purpose of the present effort was to demonstrate 'on the fly' temperature measurement of railgun armatures on a bench top railgun. The effort builds on the previous test that utilized a portable unit with armature speeds ranging from 50 to 90 m/s. The tests described here involved higher speeds, ranging from 300 to 500 m/s. The method to accomplish the measurement involves pulsed laser illumination of a phosphor-coated armature. The duration of the ensuing fluorescence indicates temperature. The measured temperatures, obtained both inside the muzzle and outside in free flight, ranged between 80 to 110 C. The required pulsed fluorescence was made possible by successfully sensing the position of the armature while traveling within the laser illumination and fluorescence sensing fields-of-view. A high-speed camera also captured images of the moving armatures after exiting the railgun. These images sometimes included the fluorescing region of the phosphor coating.

  4. HVEPS Scramjet-Driven MHD Power Demonstration Test Results (Preprint)

    Science.gov (United States)

    2007-06-01

    seeding for the scramjet- driven MHD demonstration test was accomplished by the injection of liquid NaK into the backplate of the UTRC pre-heater... NaK is a eutectic consisting of approximately 80% potassium and 20% sodium. It exists in liquid form at room temperature and has flow properties...quite similar to water. However, there are materials handling safety issues with use of NaK since it is highly caustic alkali metal and burns on

  5. STS-47 crewmembers during KSC terminal countdown demonstration test (TCDT)

    Science.gov (United States)

    1992-01-01

    STS-47 crewmembers participate in terminal countdown demonstration test (TCDT) at Kennedy Space Center (KSC). On KSC Launch Complex (LC) Pad 39B tower, Mission Specialist (MS) Mark C. Lee (wearing sunglasses) points to a distant location as Japanese Payload Specialist Mamoru Mohri (center), and Mission Specialist Mae C. Jemison look on. The crewmembers are standing on the launch tower's slidewire emergency egress system platform.

  6. Industrial Fuel Gas Demonstration Plant Project. Management plan (Deliverable No. 1)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-05-31

    This Project Management Plan establishes the organization and procedures by which the Memphis Medium-Btu Fuel Gas Demonstration Plant will be managed and defines the responsibilities and functions of project participants. This plan should not be construed as modifying contract provisions or documents in any way. It applies mainly to Phase I activities; the conceptual design and development of the demonstration plant. Plans for Phases II and III will be prepared before these phases are initiated. This management plan is intended to be a working document to be revised as the needs of the project dictate. The looseleaf format will facilitate changes by making it possible to add and remove pages.

  7. Test Plan for Tank 241-AZ-101 Solubility Screening Tests

    Energy Technology Data Exchange (ETDEWEB)

    PERSON, J.C.

    1999-12-03

    Tank 241-AZ-101 (101-AZ) has been identified as one of the early tanks to be retrieved for waste pretreatment and immobilization. Retrieval of the tank waste from other tanks may require dilution. This test is to determine the effects of dilution on the mass of solids and their composition, which can be compared with tanks where dilution is required. This test plan gives test instructions, example data sheets, a waste compatibility review, and a waste stream fact sheet.

  8. General Electric Company proposed management plan, commercial buildings, National Solar Demonstration Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-04-01

    The National Solar Demonstration Plan (NSDP) for the solar heating and cooling of non-residential buildings is designed to meet the goals and objectives of ERDA 23A. The plan has been formulated for a matrix of two hundred (200) commercial demonstration projects. This report contains the General Electric recommendations for the NSDP pertaining to the management structure, demonstration implementation, schedules, data dissemination, and resource requirements. Closely associated with these major planning elements are the related elements in the other recent General Electric reports submitted under the SHACOB Phase I contract. (WDM)

  9. General test plan redundant sensor strapdown IMU evaluation program

    Science.gov (United States)

    Hartwell, T.; Irwin, H. A.; Miyatake, Y.; Wedekind, D. E.

    1971-01-01

    The general test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The inertial unit contains six gyros and three orthogonal accelerometers. The software incorporates failure detection and correction logic and a land vehicle navigation program. The principal objective of the test is a demonstration of the practicability, reliability, and performance of the inertial measuring unit with failure detection and correction in operational environments.

  10. Gearbox Reliability Collaborative Phase 3 Gearbox 3 Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Keller, Jonathan [National Renewable Energy Lab. (NREL), Golden, CO (United States); Wallen, Robb [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-10-01

    This document describes the Phase 3 test plan for the Gearbox Reliability Collaborative Gearbox #3. The primary test objective is to measure the planetary load sharing characteristics in the same conditions as the original gearbox design. If the measured load-sharing characteristics are close to the design model, the projected three-times improvement in planetary section predicted fatigue life and the efficacy of preloaded tapered roller bearings in mitigating the planetary bearing fatigue failure mode will have been demonstrated.

  11. Robust Design of Reliability Test Plans Using Degradation Measures.

    Energy Technology Data Exchange (ETDEWEB)

    Lane, Jonathan Wesley; Lane, Jonathan Wesley; Crowder, Stephen V.; Crowder, Stephen V.

    2014-10-01

    With short production development times, there is an increased need to demonstrate product reliability relatively quickly with minimal testing. In such cases there may be few if any observed failures. Thus, it may be difficult to assess reliability using the traditional reliability test plans that measure only time (or cycles) to failure. For many components, degradation measures will contain important information about performance and reliability. These measures can be used to design a minimal test plan, in terms of number of units placed on test and duration of the test, necessary to demonstrate a reliability goal. Generally, the assumption is made that the error associated with a degradation measure follows a known distribution, usually normal, although in practice cases may arise where that assumption is not valid. In this paper, we examine such degradation measures, both simulated and real, and present non-parametric methods to demonstrate reliability and to develop reliability test plans for the future production of components with this form of degradation.

  12. Autonomous Airborne Refueling Demonstration: Phase I Flight-Test Results

    Science.gov (United States)

    Dibley, Ryan P.; Allen, Michael J.; Nabaa, Nassib

    2007-01-01

    The first phase of the Autonomous Airborne Refueling Demonstration (AARD) project was completed on August 30, 2006. The goal of this 15-month effort was to develop and flight-test a system to demonstrate an autonomous refueling engagement using the Navy style hose-and-drogue air-to-air refueling method. The prime contractor for this Defense Advanced Research Projects Agency (DARPA) sponsored program was Sierra Nevada Corporation (SNC), Sparks, Nevada. The responsible flight-test organization was the National Aeronautics and Space Administration (NASA) Dryden Flight Research Center (DFRC), Edwards, California, which also provided the F/A-18 receiver airplane (McDonnell Douglas, now The Boeing Company, Chicago, Illinois). The B-707-300 tanker airplane (The Boeing Company) was contracted through Omega Aerial Refueling Services, Inc., Alexandria, Virginia, and the optical tracking system was contracted through OCTEC Ltd., Bracknell, Berkshire, United Kingdom. Nine research flights were flown, testing the functionality and performance of the system in a stepwise manner, culminating in the plug attempts on the final flight. Relative position keeping was found to be very stable and accurate. The receiver aircraft was capable of following the tanker aircraft through turns while maintaining its relative position. During the last flight, six capture attempts were made, two of which were successful. The four misses demonstrated excellent characteristics, the receiver retreating from the drogue in a controlled, safe, and predictable manner that precluded contact between the drogue and the receiver aircraft. The position of the receiver aircraft when engaged and in position for refueling was found to be 5.5 to 8.5 ft low of the ideal position. The controller inputs to the F/A-18 were found to be extremely small.

  13. Autonomous Airborne Refueling Demonstration, Phase I Flight-Test Results

    Science.gov (United States)

    Dibley, Ryan P.; Allen, Michael J.; Nabaa, Nassib

    2007-01-01

    The first phase of the Autonomous Airborne Refueling Demonstration (AARD) project was completed on August 30, 2006. The goal of this 15-month effort was to develop and flight-test a system to demonstrate an autonomous refueling engagement using the Navy style hose-and-drogue air-to-air refueling method. The prime contractor for this Defense Advanced Research Projects Agency (DARPA) sponsored program was Sierra Nevada Corporation (SNC), Sparks, Nevada. The responsible flight-test organization was the NASA Dryden Flight Research Center (DFRC), Edwards, California, which also provided the F/A-18 receiver airplane (McDonnell Douglas, now The Boeing Company, Chicago, Illinois). The B-707-300 tanker airplane (The Boeing Company) was contracted through Omega Aerial Refueling Services, Inc., Alexandria, Virginia, and the optical tracking system was contracted through OCTEC Ltd., Bracknell, Berkshire, United Kingdom. Nine research flights were flown, testing the functionality and performance of the system in a stepwise manner, culminating in the plug attempts on the final flight. Relative position keeping was found to be very stable and accurate. The receiver aircraft was capable of following the tanker aircraft through turns while maintaining its relative position. During the last flight, six capture attempts were made, two of which were successful. The four misses demonstrated excellent characteristics, the receiver retreating from the drogue in a controlled, safe, and predictable manner that precluded contact between the drogue and the receiver aircraft. The position of the receiver aircraft when engaged and in position for refueling was found to be 5.5 to 8.5 ft low of the ideal position. The controller inputs to the F/A-18 were found to be extremely small

  14. Test data from the US-Demonstration Poloidal Coil experiment

    Energy Technology Data Exchange (ETDEWEB)

    Painter, T.A.; Steeves, M.M.; Takayasu, M.; Gung, C.; Hoenig, M.O. [Massachusetts Inst. of Tech., Cambridge, MA (United States). Plasma Fusion Center; Tsuji, H.; Ando, T.; Hiyama, T.; Takahashi, Y.; Nishi, M.; Yoshida, K.; Okuno, K.; Nakajima, H.; Kato, T.; Sugimoto, M.; Isono, T.; Kawano, K.; Koizumi, N.; Osikiri, M.; Hanawa, H.; Ouchi, H.; Ono, M.; Ishida, H.; Hiue, H.; Yoshida, J.; Kamiyauchi, Y.; Ouchi, T.; Tajiri, F.; Kon, Y.; Shimizu, H.; Matsuzaki, Y.; Oomori, S.; Tani, T.; Oomori, K.; Terakado, T.; Yagyu, J.; Oomori, H. [Japan Atomic Energy Research Inst., Naka, Ibaraki (Japan). Superconducting Magnet Lab.

    1992-01-01

    The US Demonstration Poloidal Field Coil (US-DPC) experiment took place successfully at the Japan Atomic Energy Research Institute (JAERI) in late 1990. The 8 MJ niobium-tin coil was leak tight; it performed very well in DC tests; it performed well in AC tests, achieving approximately 70% of its design goal. An unexpected ramp-rate barrier at high currents was identified. The barrier could not be explored in the regime of higher fields and slower ramp rates due to limitations of the background-field coils. This document presents the results of the experiment with as little editing as possible. The coil, conductor, and operating conditions are given. The intent is to present data in a form that can be used by magnet analysts and designers.

  15. GEOCHEMICAL TESTING AND MODEL DEVELOPMENT - RESIDUAL TANK WASTE TEST PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CANTRELL KJ; CONNELLY MP

    2010-03-09

    This Test Plan describes the testing and chemical analyses release rate studies on tank residual samples collected following the retrieval of waste from the tank. This work will provide the data required to develop a contaminant release model for the tank residuals from both sludge and salt cake single-shell tanks. The data are intended for use in the long-term performance assessment and conceptual model development.

  16. Cold face test demonstrates parasympathetic cardiac dysfunction in familial dysautonomia.

    Science.gov (United States)

    Hilz, M J; Stemper, B; Sauer, P; Haertl, U; Singer, W; Axelrod, F B

    1999-06-01

    In familial dysautonomia (FD), i.e., Riley-Day syndrome, parasympathetic dysfunction has not been sufficiently evaluated. The cold face test is a noninvasive method of activating trigeminal brain stem cardiovagal and sympathetic pathways and can be performed in patients with limited cooperation. We performed cold face tests in 11 FD patients and 15 controls. For 60 s, cold compresses (0-1 degrees C) were applied to the cheeks and forehead while we monitored heart rate, respiration, beat-to-beat radial artery blood pressure, and laser-Doppler skin blood flow at the first toe pulp. From these measurements heart rate variability parameters were calculated: root mean square of successive differences (RMSSD), coefficient of variation (CV), low- and high-frequency (LF and HF, respectively) power spectra of the electrocardiogram, and the LF transfer function gain between blood pressure and heart rate. All patients perceived cold stimulation and acknowledged discomfort. In controls, heart rate and skin blood flow decreased significantly during cold face test; in patients, both parameters decreased only briefly and not significantly. In controls, blood pressure, RMSSD, CV, and heart rate HF-power spectra increased but remained unchanged in patients. Respiration, as well as heart rate LF power spectra, did not change in either group. In controls, LF transfer function gain between blood pressure and heart rate indicated that bradycardia was not secondary to blood pressure increase. We conclude that the cold face test demonstrated that patients with FD have a reduced cardiac parasympathetic response, which implies efferent parasympathetic dysfunction.

  17. Secondary Waste Cast Stone Waste Form Qualification Testing Plan

    Energy Technology Data Exchange (ETDEWEB)

    Westsik, Joseph H.; Serne, R. Jeffrey

    2012-09-26

    The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is being constructed to treat the 56 million gallons of radioactive waste stored in 177 underground tanks at the Hanford Site. The WTP includes a pretreatment facility to separate the wastes into high-level waste (HLW) and low-activity waste (LAW) fractions for vitrification and disposal. The LAW will be converted to glass for final disposal at the Integrated Disposal Facility (IDF). Cast Stone – a cementitious waste form, has been selected for solidification of this secondary waste stream after treatment in the ETF. The secondary-waste Cast Stone waste form must be acceptable for disposal in the IDF. This secondary waste Cast Stone waste form qualification testing plan outlines the testing of the waste form and immobilization process to demonstrate that the Cast Stone waste form can comply with the disposal requirements. Specifications for the secondary-waste Cast Stone waste form have not been established. For this testing plan, Cast Stone specifications are derived from specifications for the immobilized LAW glass in the WTP contract, the waste acceptance criteria for the IDF, and the waste acceptance criteria in the IDF Permit issued by the State of Washington. This testing plan outlines the testing needed to demonstrate that the waste form can comply with these waste form specifications and acceptance criteria. The testing program must also demonstrate that the immobilization process can be controlled to consistently provide an acceptable waste form product. This testing plan also outlines the testing needed to provide the technical basis for understanding the long-term performance of the waste form in the disposal environment. These waste form performance data are needed to support performance assessment analyses of the long-term environmental impact of the secondary-waste Cast Stone waste form in the IDF

  18. Heat Pipe Powered Stirling Conversion for the Demonstration Using Flattop Fission (DUFF) Test

    Science.gov (United States)

    Gibson, Marc A.; Briggs, Maxwell H.; Sanzi, James L.; Brace, Michael H.

    2013-01-01

    Design concepts for small Fission Power Systems (FPS) have shown that heat pipe cooled reactors provide a passive, redundant, and lower mass option to transfer heat from the fuel to the power conversion system, as opposed to pumped loop designs typically associated with larger FPS. Although many systems have been conceptually designed and a few making it to electrically heated testing, none have been coupled to a real nuclear reactor. A demonstration test named DUFF Demonstration Using Flattop Fission, was planned by the Los Alamos National Lab (LANL) to use an existing criticality experiment named Flattop to provide the nuclear heat source. A team from the NASA Glenn Research Center designed, built, and tested a heat pipe and power conversion system to couple to Flattop with the end goal of making electrical power. This paper will focus on the design and testing performed in preparation for the DUFF test.

  19. Controlled Impact Demonstration instrumented test dummies installed in plane

    Science.gov (United States)

    1984-01-01

    In this photograph are seen some of dummies in the passenger cabin of the B-720 aircraft. NASA Langley Research Center instrumented a large portion of the aircraft and the dummies for loads in a crashworthiness research program. In 1984 NASA Dryden Flight Research Facility and the Federal Aviation Adimistration (FAA) teamed-up in a unique flight experiment called the Controlled Impact Demonstration (CID). The test involved crashing a Boeing 720 aircraft with four JT3C-7 engines burning a mixture of standard fuel with an additive called Anti-misting Kerosene (AMK) designed to supress fire. In a typical aircraft crash, fuel spilled from ruptured fuel tanks forms a fine mist that can be ignited by a number of sources at the crash site. In 1984 the NASA Dryden Flight Research Facility (after 1994 a full-fledged Center again) and the Federal Aviation Administration (FAA) teamed-up in a unique flight experiment called the Controlled Impact Demonstration (CID), to test crash a Boeing 720 aircraft using standard fuel with an additive designed to supress fire. The additive, FM-9, a high-molecular-weight long-chain polymer, when blended with Jet-A fuel had demonstrated the capability to inhibit ignition and flame propagation of the released fuel in simulated crash tests. This anti-misting kerosene (AMK) cannot be introduced directly into a gas turbine engine due to several possible problems such as clogging of filters. The AMK must be restored to almost Jet-A before being introduced into the engine for burning. This restoration is called 'degradation' and was accomplished on the B-720 using a device called a 'degrader.' Each of the four Pratt & Whitney JT3C-7 engines had a 'degrader' built and installed by General Electric (GE) to break down and return the AMK to near Jet-A quality. In addition to the AMK research the NASA Langley Research Center was involved in a structural loads measurement experiment, which included having instrumented dummies filling the seats in the

  20. Test plan for ISV laboratory-pyrolysis testing

    Energy Technology Data Exchange (ETDEWEB)

    McAtee, R.E.

    1991-09-01

    The objective of the laboratory-pyrolysis studies is to obtain information on the high temperature (< 1200{degree}C) degradation and alteration of organic chemicals and materials similar to those found in the Radioactive Waste Management Complex, Pit 9. This test plan describes experimental procedures, sampling and analysis strategy, sampling procedures, sample control, and document management. It addresses safety issues in the experimental apparatus and procedures, personal training, and hazardous waste disposal. Finally, it describes the data quality objectives using the EPA tiered approach to treatability studies to define where research/scoping tests fit into these studies and the EPA analytical levels required for the tests.

  1. Test plans of the high temperature test operation at HTTR

    Energy Technology Data Exchange (ETDEWEB)

    Sakaba, Nariaki; Nakagawa, Shigeaki; Takada, Eiji [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment] [and others

    2003-03-01

    HTTR plans a high temperature test operation as the fifth step of the rise-to-power tests to achieve a reactor outlet coolant temperature of 950 degrees centigrade in the 2003 fiscal year. Since HTTR is the first HTGR in Japan which uses coated particle fuel as its fuel and helium gas as its coolant, it is necessary that the plan of the high temperature test operation is based on the previous rise-to-power tests with a thermal power of 30 MW and a reactor outlet coolant temperature at 850 degrees centigrade. During the high temperature test operation, reactor characteristics, reactor performances and reactor operations are confirmed for the safety and stability of operations. This report describes the evaluation result of the safety confirmations of the fuel, the control rods and the intermediate heat exchanger for the high temperature test operation. Also, problems which were identified during the previous operations are shown with their solution methods. Additionally, there is a discussion on the contents of the high temperature test operation. As a result of this study, it is shown that the HTTR can safely achieve a thermal power of 30 MW with the reactor outlet coolant temperature at 950 degrees centigrade. (author)

  2. Demonstration of concurrent tensile testing and magnetic resonance elastography.

    Science.gov (United States)

    Brinker, Spencer; Klatt, Dieter

    2016-10-01

    Magnetic Resonance Elastography (MRE) is a technique used to measure the mechanical properties of soft tissues and has already shown its diagnostic potential for pathologies involving fibrogenesis and neurodegeneration. Experimental investigation of loading during MRE is fairly unexplored and may help to better understand changing mechanical properties in relation to organ function. Tensile testing is a common technique for examining mechanical properties of materials and is used as the simultaneous comparison method with MRE in this study. 3D MRE data was acquired during quasistatic uniaxial tensile loading of an Ecoflex 0010 cylindrical specimen. Individual MRE scans at 1.5, 2.0, and 2.5kHz where performed on engineering strain increments of 20% from 0% to 140% while tensile reaction force was recorded using a load cell attached to an adjustable elongation slide. Tensile stress-strain relation resembled the Fung hyperelastic strain energy model. We observe that the MRE shear storage modulus is related to the state of tensile deformation. This study demonstrates the feasibility of simultaneous tensile testing during MRE and the new design can potentially be used for MRE calibration using pre-tension. Copyright © 2016 Elsevier Ltd. All rights reserved.

  3. Fission Surface Power Technology Demonstration Unit Test Results

    Science.gov (United States)

    Briggs, Maxwell H.; Gibson, Marc A.; Geng, Steven M.; Sanzi, James L.

    2016-01-01

    The Fission Surface Power (FSP) Technology Demonstration Unit (TDU) is a system-level demonstration of fission power technology intended for use on manned missions to Mars. The Baseline FSP systems consists of a 190 kWt UO2 fast-spectrum reactor cooled by a primary pumped liquid metal loop. This liquid metal loop transfers heat to two intermediate liquid metal loops designed to isolate fission products in the primary loop from the balance of plant. The intermediate liquid metal loops transfer heat to four Stirling Power Conversion Units (PCU), each of which produce 12 kWe (48 kW total) and reject waste heat to two pumped water loops, which transfer the waste heat to titanium-water heat pipe radiators. The FSP TDU simulates a single leg of the baseline FSP system using an electrically heater core simulator, a single liquid metal loop, a single PCU, and a pumped water loop which rejects the waste heat to a Facility Cooling System (FCS). When operated at the nominal operating conditions (modified for low liquid metal flow) during TDU testing the PCU produced 8.9 kW of power at an efficiency of 21.7 percent resulting in a net system power of 8.1 kW and a system level efficiency of 17.2 percent. The reduction in PCU power from levels seen during electrically heated testing is the result of insufficient heat transfer from the NaK heater head to the Stirling acceptor, which could not be tested at Sunpower prior to delivery to the NASA Glenn Research Center (GRC). The maximum PCU power of 10.4 kW was achieved at the maximum liquid metal temperature of 875 K, minimum water temperature of 350 K, 1.1 kg/s liquid metal flow, 0.39 kg/s water flow, and 15.0 mm amplitude at an efficiency of 23.3 percent. This resulted in a system net power of 9.7 kW and a system efficiency of 18.7 percent.

  4. Water NSTF Design, Instrumentation, and Test Planning

    Energy Technology Data Exchange (ETDEWEB)

    Lisowski, Darius D.; Gerardi, Craig D.; Hu, Rui; Kilsdonk, Dennis J.; Bremer, Nathan C.; Lomperski, Stephen W.; Kraus, Adam R.; Bucknor, Matthew D.; Lv, Qiuping; Farmer, Mitchell T.

    2017-08-01

    The following report serves as a formal introduction to the water-based Natural convection Shutdown heat removal Test Facility (NSTF) program at Argonne. Since 2005, this US Department of Energy (DOE) sponsored program has conducted large scale experimental testing to generate high-quality and traceable validation data for guiding design decisions of the Reactor Cavity Cooling System (RCCS) concept for advanced reactor designs. The most recent facility iteration, and focus of this report, is the operation of a 1/2 scale model of a water-RCCS concept. Several features of the NSTF prototype align with the conceptual design that has been publicly released for the AREVA 625 MWt SC-HTGR. The design of the NSTF also retains all aspects common to a fundamental boiling water thermosiphon, and thus is well poised to provide necessary experimental data to advance basic understanding of natural circulation phenomena and contribute to computer code validation. Overall, the NSTF program operates to support the DOE vision of aiding US vendors in design choices of future reactor concepts, advancing the maturity of codes for licensing, and ultimately developing safe and reliable reactor technologies. In this report, the top-level program objectives, testing requirements, and unique considerations for the water cooled test assembly are discussed, and presented in sufficient depth to support defining the program’s overall scope and purpose. A discussion of the proposed 6-year testing program is then introduced, which outlines the specific strategy and testing plan for facility operations. The proposed testing plan has been developed to meet the toplevel objective of conducting high-quality test operations that span across a broad range of single- and two-phase operating conditions. Details of characterization, baseline test cases, accident scenario, and parametric variations are provided, including discussions of later-stage test cases that examine the influence of geometric

  5. Integrated Assessment Plan Template and Operational Demonstration for SPIDERS Phase 2: Fort Carson

    Energy Technology Data Exchange (ETDEWEB)

    Barr, Jonathan L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tuffner, Francis K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hadley, Mark D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kreyling, Sean J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Schneider, Kevin P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-09-01

    This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collected from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).

  6. Test Plan: WIPP bin-scale CH TRU waste tests

    Energy Technology Data Exchange (ETDEWEB)

    Molecke, M.A.

    1990-08-01

    This WIPP Bin-Scale CH TRU Waste Test program described herein will provide relevant composition and kinetic rate data on gas generation and consumption resulting from TRU waste degradation, as impacted by synergistic interactions due to multiple degradation modes, waste form preparation, long-term repository environmental effects, engineered barrier materials, and, possibly, engineered modifications to be developed. Similar data on waste-brine leachate compositions and potentially hazardous volatile organic compounds released by the wastes will also be provided. The quantitative data output from these tests and associated technical expertise are required by the WIPP Performance Assessment (PA) program studies, and for the scientific benefit of the overall WIPP project. This Test Plan describes the necessary scientific and technical aspects, justifications, and rational for successfully initiating and conducting the WIPP Bin-Scale CH TRU Waste Test program. This Test Plan is the controlling scientific design definition and overall requirements document for this WIPP in situ test, as defined by Sandia National Laboratories (SNL), scientific advisor to the US Department of Energy, WIPP Project Office (DOE/WPO). 55 refs., 16 figs., 19 tabs.

  7. Demonstration testing and evaluation of in situ soil heating. Revision 1, Demonstration system design

    Energy Technology Data Exchange (ETDEWEB)

    Dev, H.

    1994-08-16

    Over the last nine years IIT Research Institute (IITRI) has been developing and testing the in situ heating and soil decontamination process for the remediation of soils containing hazardous organic contaminants. In this process the soil is heated in situ using electrical energy. The contaminants are removed from the soil due to enhanced vaporization, steam distillation and stripping. The vaporized contaminants, water vapor and air are recovered from the heated zone by means of a vacuum manifold system which collects gases from below surface as well as from the soil surface. A vapor barrier is used to prevent fugitive emissions of the contaminants and to control air infiltration to minimize dilution of the contaminant gases and vapors. The recovered gases and vapors are conveyed to an on site vapor treatment system for the clean up of the vent gases. Electrical energy is applied to the soil by forming an array of electrodes in the soil which are electrically interconnected and supplied with power. The electrodes are placed in drilled bore holes which are made through the contaminated zone. There are two versions of the in situ heating and soil treatment process: the f irst version is called the In Situ Radio Frequency (RF) Soil Decontamination Process and the second version is called the In Situ Electromagnetic (EM) Soil Decontamination Process. The first version, the RF Process is capable of heating the soil in a temperature range of 100{degrees} to 400{degrees}C. The soil temperature in the second version, the EM Process, is limited to the boiling point of water under native conditions. Thus the soil will be heated to a temperature of about 85{degrees} to 95{degrees}C. In this project IITRI will demonstrate the EM Process for in situ soil decontamination at K-25 Site due to the fact that most of the contaminants of concern are volatile organics which can be removed by heating the soil to a temperature range of 85{degrees} to 95{degrees}C.

  8. Acceptance sampling reliability test plans for alpha distributed lifetime

    OpenAIRE

    Khan, Maroof A.; Islam, H. M.

    2013-01-01

    Determining the acceptability of any product, reliability sampling plans are used. In this paper, reliability sampling plans for truncated life test are developed when the lifetimes of a test follow an alpha distribution. The sampling plan proposed here can save the test time in practical situations. Sampling plans are established through an algorithm. Moreover, some tables are provided for the proposed sampling plans so that proposed method can be used conveniently for the practitioner. Oper...

  9. Single Event Effects (SEE) Testing: Practical Approach to Test Plans

    Science.gov (United States)

    LaBel, Kenneth A.; Pellish, Jonathan Allen; Berg, Melanie D.

    2014-01-01

    While standards and guidelines for performing SEE testing have existed for several decades, guidance for developing SEE test plans has not been as easy to find. In this presentation, the variety of areas that need to be considered ranging from resource issues (funds, personnel, schedule) to extremely technical challenges (particle interaction and circuit application), shall be discussed. Note: we consider the approach outlined here as a "living" document: Mission-specific constraints and new technology related issues always need to be taken into account.

  10. Bayesian Zero-Failure (BAZE) reliability demonstration testing procedure for components of nuclear reactor safety systems

    Energy Technology Data Exchange (ETDEWEB)

    Waller, R.A.

    1977-06-01

    A Bayesian-Zero-Failure (BAZE) reliability demonstration testing procedure is presented. The method is developed for an exponential failure-time model and a gamma prior distribution on the failure-rate. A simple graphical approach using percentiles is used to fit the prior distribution. The procedure is given in an easily applied step-by-step form which does not require the use of a computer for its implementation. The BAZE approach is used to obtain sample test plans for selected components of nuclear reactor safety systems.

  11. ORNL/IAT ARMATURE DIAGNOSTICS DEMONSTRATION TEST REPORT

    Energy Technology Data Exchange (ETDEWEB)

    Allison, Stephen W [ORNL; Cates, Michael R [ORNL; Goedeke, Shawn [ORNL; Crawford, M. T. [Institute for Advanced Technology, Austin, TX; Ferraro, S. B. [Institute for Advanced Technology, Austin, TX; Akerman, A. [Diditco, Inc., Knoxville

    2005-03-01

    This test established feasibility for 'on the fly' temperature measurements of rail gun projectiles. In addition, an approach for projectile velocity measurement was also demonstrated. Insight was gained into other useful optical and fiberoptic diagnostic approaches. Instantaneous diagnostics could be critical for achieving further improvements in rail gun operation. They have the potential to enable design enhancements by providing information on the state of the armature and its relationship to the rail as it proceeds down the bore. To that end, the following was accomplished: (1) Optical fibers successfully delivered optical excitation and returned reflective and fluorescence signals as desired. (2) Luminescent coatings survived multiple firings--approximately 40 shots. (3) Optical triggering effectively synchronized an ultraviolet laser pulse to strike the moving armature. (4) Velocity measurements were successfully accomplished by either triggering on the armature front edge using two red diode lasers or by using a single laser and grooved marks a known distance apart on the armature surface. (5) Velocities ranged from 19 to 88 m/s. (6) Temperatures of 30 to 92 C were measured with a precision of about 2 C-: (a) This precision was achieved with a single laser shot and (b) Motion effect was observed but a methodology adequately corrected the result. The correction was only about 2 C. (7) Adequate signal-to-noise and measurement precision was achieved with a single laser shot.

  12. Preliminary Scaling Estimate for Select Small Scale Mixing Demonstration Tests

    Energy Technology Data Exchange (ETDEWEB)

    Wells, Beric E.; Fort, James A.; Gauglitz, Phillip A.; Rector, David R.; Schonewill, Philip P.

    2013-09-12

    The Hanford Site double-shell tank (DST) system provides the staging location for waste that will be transferred to the Hanford Tank Waste Treatment and Immobilization Plant (WTP). Specific WTP acceptance criteria for waste feed delivery describe the physical and chemical characteristics of the waste that must be met before the waste is transferred from the DSTs to the WTP. One of the more challenging requirements relates to the sampling and characterization of the undissolved solids (UDS) in a waste feed DST because the waste contains solid particles that settle and their concentration and relative proportion can change during the transfer of the waste in individual batches. A key uncertainty in the waste feed delivery system is the potential variation in UDS transferred in individual batches in comparison to an initial sample used for evaluating the acceptance criteria. To address this uncertainty, a number of small-scale mixing tests have been conducted as part of Washington River Protection Solutions’ Small Scale Mixing Demonstration (SSMD) project to determine the performance of the DST mixing and sampling systems.

  13. Max Launch Abort System (MLAS) Landing Parachute Demonstrator (LPD) Drop Test

    Science.gov (United States)

    Shreves, Christopher M.

    2011-01-01

    The Landing Parachute Demonstrator (LPD) was conceived as a low-cost, rapidly-developed means of providing soft landing for the Max Launch Abort System (MLAS) crew module (CM). Its experimental main parachute cluster deployment technique and off-the-shelf hardware necessitated a full-scale drop test prior to the MLAS mission in order to reduce overall mission risk. This test was successfully conducted at Wallops Flight Facility on March 6, 2009, with all vehicle and parachute systems functioning as planned. The results of the drop test successfully qualified the LPD system for the MLAS flight test. This document captures the design, concept of operations and results of the drop test.

  14. Hydraulic Hybrid Parcel Delivery Truck Deployment, Testing & Demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Gallo, Jean-Baptiste [Calstart Incorporated, Pasadena, CA (United States)

    2014-03-07

    Although hydraulic hybrid systems have shown promise over the last few years, commercial deployment of these systems has primarily been limited to Class 8 refuse trucks. In 2005, the Hybrid Truck Users Forum initiated the Parcel Delivery Working Group including the largest parcel delivery fleets in North America. The goal of the working group was to evaluate and accelerate commercialization of hydraulic hybrid technology for parcel delivery vehicles. FedEx Ground, Purolator and United Parcel Service (UPS) took delivery of the world’s first commercially available hydraulic hybrid parcel delivery trucks in early 2012. The vehicle chassis includes a Parker Hannifin hydraulic hybrid drive system, integrated and assembled by Freightliner Custom Chassis Corp., with a body installed by Morgan Olson. With funding from the U.S. Department of Energy, CALSTART and its project partners assessed the performance, reliability, maintainability and fleet acceptance of three pre-production Class 6 hydraulic hybrid parcel delivery vehicles using information and data from in-use data collection and on-road testing. This document reports on the deployment of these vehicles operated by FedEx Ground, Purolator and UPS. The results presented provide a comprehensive overview of the performance of commercial hydraulic hybrid vehicles in parcel delivery applications. This project also informs fleets and manufacturers on the overall performance of hydraulic hybrid vehicles, provides insights on how the technology can be both improved and more effectively used. The key findings and recommendations of this project fall into four major categories: -Performance, -Fleet deployment, -Maintenance, -Business case. Hydraulic hybrid technology is relatively new to the market, as commercial vehicles have been introduced only in the past few years in refuse and parcel delivery applications. Successful demonstration could pave the way for additional purchases of hydraulic hybrid vehicles throughout the

  15. The development and testing of pulsed detonation engine ground demonstrators

    Science.gov (United States)

    Panicker, Philip Koshy

    2008-10-01

    The successful implementation of a PDE running on fuel and air mixtures will require fast-acting fuel-air injection and mixing techniques, detonation initiation techniques such as DDT enhancing devices or a pre-detonator, an effective ignition system that can sustain repeated firing at high rates and a fast and capable, closed-loop control system. The control system requires high-speed transducers for real-time monitoring of the PDE and the detection of the detonation wave speed. It is widely accepted that the detonation properties predicted by C-J detonation relations are fairly accurate in comparison to experimental values. The post-detonation flow properties can also be expressed as a function of wave speed or Mach number. Therefore, the PDE control system can use C-J relations to predict the post-detonation flow properties based on measured initial conditions and compare the values with those obtained from using the wave speed. The controller can then vary the initial conditions within the combustor for the subsequent cycle, by modulating the frequency and duty cycle of the valves, to obtain optimum air and fuel flow rates, as well as modulate the energy and timing of the ignition to achieve the required detonation properties. Five different PDE ground demonstrators were designed, built and tested to study a number of the required sub-systems. This work presents a review of all the systems that were tested, along with suggestions for their improvement. The PDE setups, ranged from a compact PDE with a 19 mm (3/4 in.) i.d., to two 25 mm (1 in.) i.d. setups, to a 101 mm (4 in.) i.d. dual-stage PDE setup with a pre-detonator. Propane-oxygen mixtures were used in the smaller PDEs. In the dual-stage PDE, propane-oxygen was used in the pre-detonator, while propane-air mixtures were used in the main combustor. Both rotary valves and solenoid valve injectors were studied. The rotary valves setups were tested at 10 Hz, while the solenoid valves were tested at up to 30 Hz

  16. Demonstrating Hemostasis with a Student-Designed Prothrombin Time Test

    Science.gov (United States)

    Fardy, Richard Wiley

    1978-01-01

    Describes a blood coagulation test developed by two high school biology students. Although the test lacks some precision, results indicate that the technique is comparable to standard methods used in laboratories. (MA)

  17. HotSpot Software Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Walker, H; Homann, S G

    2009-03-12

    This Software Test Plan (STP) describes the procedures used to verify and validate that the HotSpot Health Physics Codes meet the requirements of its user base, which includes: (1) Users of the PC version of HotSpot conducting consequence assessment, hazard assessment and safety analysis calculations; and (2) Users of the NARAC Web and iClient software tools, which allow users to run HotSpot for consequence assessment modeling. This plan is intended to meet Critical Recommendation 2 from the Software Evaluation of HotSpot and DOE Safety Software Toolbox Recommendation for inclusion of HotSpot in the Department of Energy (DOE) Safety Software Toolbox. These users and sponsors of the HotSpot software and the organizations they represent constitute the intended audience for this document. HotSpot software is maintained for the Department of Energy Office of Emergency Operations by the National Atmospheric Release Advisory Center (NARAC) at Lawrence Livermore National Laboratory (LLNL). An overview of HotSpot and NARAC are provided.

  18. 40 CFR 63.2851 - What is a plan for demonstrating compliance?

    Science.gov (United States)

    2010-07-01

    ... source because of site-specific factors such as equipment design characteristics and operating conditions... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What is a plan for demonstrating compliance? 63.2851 Section 63.2851 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)...

  19. AGC-1 Irradiation Experiment Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    R. L. Bratton

    2006-05-01

    The Advanced Graphite Capsule (AGC) irradiation test program supports the acquisition of irradiated graphite performance data to assist in the selection of the technology to be used for the VHTR. Six irradiations are planned to investigate compressive creep in graphite subjected to a neutron field and obtain irradiated mechanical properties of vibrationally molded, extruded, and iso-molded graphites for comparison. The experiments will be conducted at three temperatures: 600, 900, and 1200°C. At each temperature, two different capsules will be irradiated to different fluence levels, the first from 0.5 to 4 dpa and the second from 4 to 7 dpa. AGC-1 is the first of the six capsules designed for ATR and will focus on the prismatic fluence range.

  20. Nevada Test Site Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  1. The demonstration projects: creating the capacity for nursing health human resource planning in Ontario's healthcare organizations.

    Science.gov (United States)

    Burkoski, Vanessa; Tepper, Joshua

    2010-05-01

    Timely access to healthcare services requires the right number, mix and distribution of appropriately educated nurses, physicians and other healthcare professionals. In Ontario, as in several other jurisdictions, changing demographics, patterns of health service utilization and an aging workforce have created challenges related to the supply of nurses available now and in the future to deliver quality patient care. From 2006 to 2009, the Nursing Secretariat (NS) of Ontario's Ministry of Health and Long-Term Care (the ministry) undertook a progressive and comprehensive approach to address the issue of nursing supply across the province through the introduction of 17 Nursing Health Human Resources Demonstration Projects (demonstration projects). The demonstration projects initiative has led to the creation of a unique collection of best practices, tools and resources aimed at improving organizational planning capacity. Evaluation of the initiative generated recommendations that may guide the ministry toward policy and program development to foster improved nursing health human resource planning capacity in Ontario healthcare organizations.

  2. Verifying seismic design of nuclear reactors by testing. Volume 1: test plan

    Energy Technology Data Exchange (ETDEWEB)

    1979-07-20

    This document sets forth recommendations for a verification program to test the ability of operational nuclear power plants to achieve safe shutdown immediately following a safe-shutdown earthquake. The purpose of the study is to develop a program plan to provide assurance by physical demonstration that nuclear power plants are earthquake resistant and to allow nuclear power plant operators to (1) decide whether tests should be conducted on their facilities, (2) specify the tests that should be performed, and (3) estimate the cost of the effort to complete the recommended test program.

  3. 78 FR 65583 - Capital Planning and Stress Testing

    Science.gov (United States)

    2013-11-01

    ... written presentation of a covered credit union's capital planning strategies and capital adequacy process... ADMINISTRATION 12 CFR Part 702 RIN 3133-AE27 Capital Planning and Stress Testing AGENCY: National Credit Union... regcomments@ncua.gov . Include ``[Your name]-- Comments on Proposed Rule--Capital Planning and Stress Testing...

  4. Modelling, Construction, and Testing of a Simple HTS Machine Demonstrator

    DEFF Research Database (Denmark)

    Jensen, Bogi Bech; Abrahamsen, Asger Bech

    2011-01-01

    This paper describes the construction, modeling and experimental testing of a high temperature superconducting (HTS) machine prototype employing second generation (2G) coated conductors in the field winding. The prototype is constructed in a simple way, with the purpose of having an inexpensive w...

  5. TRL Assessment of Solar Sail Technology Development Following the 20-Meter System Ground Demonstrator Hardware Testing

    Science.gov (United States)

    Montgomery, Edward E.; Young, Roy M.; Adams, Charles L.

    2007-01-01

    The NASA In-Space Propulsion Technology (ISPT) Projects Office has been sponsoring 2 separate, independent system design and development hardware demonstration activities during 2002-2005. ATK Space Systems of Goleta, CA was the prime contractor for one development team and L'Garde, Inc. of Tustin, CA was the prime contractor for the other development team. The goal of these activities was to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by the year 2006. Component and subsystem fabrication and testing were completed successfully, including the ground deployment of 10-meter and 20-meter ground demonstration hardware systems under vacuum conditions. The deployment and structural testing of the 20-meter solar sail systems was conducted in the 30 meter diameter Space Power Facility thermal-vacuum chamber at NASA Glenn Plum Brook in April though August, 2005. This paper will present the results of the TRL assessment following the solar sail technology development activities associated with the design, development, analysis and testing of the 20-meter system ground demonstrators. Descriptions of the system designs for both the ATK and L'Garde systems will be presented. Changes, additions and evolution of the system designs will be highlighted. A description of the modeling and analyses activities performed by both teams, as well as testing conducted to raise the TRL of solar sail technology will be presented. A summary of the results of model correlation activities will be presented. Finally, technology gaps identified during the assessment and gap closure plans will be presented, along with "lessons learned", subsequent planning activities and validation flight opportunities for solar sail propulsion technology.

  6. Demonstration tests for HTGR fuel elements and core components with test sections in HENDEL

    Energy Technology Data Exchange (ETDEWEB)

    Miyamoto, Yoshiaki; Hino, Ryutaro; Inagaki, Yoshiyuki [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment] [and others

    1995-03-01

    In the fuel stack test section (T{sub 1}) of the Helium Engineering Demonstration Loop (HENDEL), thermal and hydraulic performances of helium gas flows through a fuel rod channel and a fuel stack have been investigated for the High-Temperature Engineering Test Reactor (HTTR) core thermal design. The test data showed that the turbulent characteristics appearing in the Reynolds number above 2000: no typical behavior in the transition zone, and friction factors and heat transfer coefficients in the fuel channel were found to be higher than those in a smooth annular channel. Heat transfer behavior of gas flow in a fuel element channel with blockage and cross-flow through a gap between upper and lower fuel elements stacked was revealed using the mock-up models. On the other hand, demonstration tests have been performed to verify thermal and hydraulic characteristics and structural integrity related to the core bottom structure using a full-scale test facility named as the in-core structure test section (T{sub 2}). The sealing performance test revealed that the leakage of low-temperature helium gas through gaps between the permanent reflector blocks to the core was very low level compared with the HTTR design value and no change of the leakage flow rate were observed after a long term operation. The heat transfer tests including thermal transient at shutdown of gas circulators verified good insulating performance of core insulation structures in the core bottom structure and the hot gas duct; the temperature of the metal portion of these structure was below the design value. Examination of the thermal mixing characteristics indicated that the mixing of the hot helium gas started at a hot plenum and finished completely at downstream of the outlet hot gas duct. The present results obtained from these demonstration tests have been practically applied to the detailed design works and licensing procedures of the HTTR. (J.P.N.) 92 refs.

  7. Joint Test Protocol: Environmentally Friendly Zirconium Oxide Pretreatment Demonstration

    Science.gov (United States)

    2013-12-01

    ferrous -based alloy exhibiting hardness greater than Rc39 (e.g., high-strength steel) requires testing and heat treatment according to Federal...compatibility with the current suite of military coatings and a range of ferrous and nonferrous substrates. The proposed zirconium-based pretreatment was...types of ferrous , zinc, and aluminum substrates by immersing the metal into a dilute solution of fluoro-zirconic acid (FZA) and proprietary additives at

  8. Test plan for FY-94 digface characterization field experiments

    Energy Technology Data Exchange (ETDEWEB)

    Josten, N.E.; Roybal, L.G.

    1994-08-01

    The digface characterization concept has been under development at the Idaho National Engineering Laboratory (INEL) since fiscal year (FY) 1992 through the support of the Buried Waste Integrated Demonstration Program. A digface characterization system conducts continuous subsurface characterization simultaneously with retrieval of hazardous and radioactive waste from buried waste sites. The system deploys multiple sensors at the retrieval operation digface and collects data that provide a basis for detecting, locating, and classifying buried materials and hazardous conditions before they are disturbed by the retrieval equipment. This test plan describes ongoing efforts to test the digface characterization concept at the INEL`s Cold Test Pit using a simplified prototype deployment apparatus and off-the-shelf sensors. FY-94 field experiments will explore problems in object detection and classification. Detection and classification of objects are fundamental to three of the four primary functions of digface characterization during overburden removal. This test plan establishes procedures for collecting and validating the digface characterization data sets. Analysis of these data will focus on testing and further developing analysis methods for object detection and classification during overburden removal.

  9. Testing the Ge detectors for the MAJORANA DEMONSTRATOR

    CERN Document Server

    Xu, W; Aguayo, E; Avignone, F T; Barabash, A S; Bertrand, F E; Boswell, M; Brudanin, V; Busch, M; Byram, D; Caldwell, A S; Chan, Y-D; Christofferson, C D; Combs, D C; Cuesta, C; Detwiler, J A; Doe, P J; Efremenko, Yu; Egorov, V; Ejiri, H; Elliott, S R; Fast, J E; Finnerty, P; Fraenkle, F M; Galindo-Uribarri, A; Giovanetti, G K; Goett, J; Green, M P; Gruszko, J; Guiseppe, V E; Gusev, K; Hallin, A L; Hazama, R; Hegai, A; Henning, R; Hoppe, E W; Howard, S; Howe, M A; Keeter, K J; Kidd, M F; Kochetov, O; Konovalov, S I; Kouzes, R T; LaFerriere, B D; Leon, J; Leviner, L E; Loach, J C; MacMullin, J; MacMullin, S; Martin, R D; Meijer, S; Mertens, S; Nomachi, M; Orrell, J L; O'Shaughnessy, C; Overman, N R; Phillips, D G; Poon, A W P; Pushkin, K; Radford, D C; Rager, J; Rielage, K; Robertson, R G H; Romero-Romero, E; Ronquest, M C; Schubert, A G; Shanks, B; Shima, T; Shirchenko, M; Snavely, K J; Snyder, N; Suriano, A M; Thompson, J; Timkin, V; Tornow, W; Trimble, J E; Varner, R L; Vasilyev, S; Vetter, K; Vorren, K; White, B R; Wilkerson, J F; Wiseman, C; Yakushev, E; Young, A R; Yu, C H; Yumatov, V

    2014-01-01

    High purity germanium (HPGe) crystals will be used for the MAJORANA DEMONSTRATOR, where they serve as both the source and the detector for neutrinoless double beta decay. It is crucial for the experiment to understand the performance of the HPGe crystals. A variety of crystal properties are being investigated, including basic properties such as energy resolution, efficiency, uniformity, capacitance, leakage current and crystal axis orientation, as well as more sophisticated properties, e.g. pulse shapes and dead layer and transition layer distributions. In this paper, we will present our measurements that characterize the HPGe crystals. We will also discuss our simulation package for the detector characterization setup, and show that additional information can be extracted from data-simulation comparisons.

  10. Reconfigurable Data Communications Packet-Switch Emulation Test Bed Demonstrated

    Science.gov (United States)

    Chu, Pong P.; Jones, Robert E.

    1999-01-01

    The Communications Technology Division at the NASA Lewis Research Center has an ongoing program to develop advanced switching and routing technology concepts for future satellite onboard processing systems. Through a university grant as a part of this research, the Cleveland State University is using a flexible reconfigurable data communications packet switch emulation test bed to investigate packet switching techniques. Because of the switching speed and protocol complexity, implementing a data communications network is a tremendous task. Various alternatives should be carefully studied and evaluated in the development stage so that the optimal system configuration can be obtained and implemented later. Therefore, it is desirable to predict the performance of the network before it is actually constructed. This is especially true in the case of satellite systems. In the past, theoretical analysis, software simulation, and prototyping were used to evaluate performance. However, each method has its drawback. There are basic tradeoffs among accuracy, cost, and required evaluation time. No method is completely satisfactory.

  11. Gas Dynamic Spray Technology Demonstration Project Management. Joint Test Report

    Science.gov (United States)

    Lewis, Pattie

    2011-01-01

    The standard practice for protecting metallic substrates in atmospheric environments is the use of an applied coating system. Current coating systems used across AFSPC and NASA contain volatile organic compounds (VOCs) and hazardous air pollutants (HAPs). These coatings are sUbject to environmental regulations at the Federal and State levels that limit their usage. In addition, these coatings often cannot withstand the high temperatures and exhaust that may be experienced by Air Force Space Command (AFSPC) and NASA structures. In response to these concerns, AFSPC and NASA have approved the use of thermal spray coatings (TSCs). Thermal spray coatings are extremely durable and environmentally friendly coating alternatives, but utilize large cumbersome equipment for application that make the coatings difficult and time consuming to repair. Other concerns include difficulties coating complex geometries and the cost of equipment, training, and materials. Gas Dynamic Spray (GOS) technology (also known as Cold Spray) was evaluated as a smaller, more maneuverable repair method as well as for areas where thermal spray techniques are not as effective. The technology can result in reduced maintenance and thus reduced hazardous materials/wastes associated with current processes. Thermal spray and GOS coatings also have no VOCs and are environmentally preferable coatings. The primary objective of this effort was to demonstrate GDS technology as a repair method for TSCs. The aim was that successful completion of this project would result in approval of GDS technology as a repair method for TSCs at AFSPC and NASA installations to improve corrosion protection at critical systems, facilitate easier maintenance activity, extend maintenance cycles, eliminate flight hardware contamination, and reduce the amount of hazardous waste generated.

  12. Test plan for prototype dielectric permittivity sensor

    Energy Technology Data Exchange (ETDEWEB)

    Pfeifer, M.C.

    1993-07-01

    The digface characterization project funded by the Buried Waste Integrated Demonstration (BWID) is designed to test a new method of monitoring hazardous conditions during the remediation at waste sites. Often on a large scale, the exact cause of each anomaly is difficult to determine and ambiguities remain in the characterization of a site. The digface characterization concept is designed to alleviate some of this uncertainty by creating systems that monitor small volumes of soil and detect anomalous areas during remediation before they are encountered. The goal of the digface characterization demonstration is to detect changes in the physical properties from one volume to another and relate these changes in physical properties to changes in the level of contamination. Dielectric permittivity mapping is a method that might prove useful in digface characterization. In this project, the role of a dielectric permittivity monitoring device is under investigation. This project addresses two issues: what are the optimal means of mapping dielectric permittivity contrasts and what types of targets can be detected using dielectric permittivity mapping.

  13. Fast flux test facility, transition project plan

    Energy Technology Data Exchange (ETDEWEB)

    Guttenberg, S.

    1994-11-15

    The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  14. Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael J.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  15. The MAJORANA DEMONSTRATOR for 0νββ: Current Status and Future Plans

    Energy Technology Data Exchange (ETDEWEB)

    Green, M. P.; Abgrall, N.; Aguayo, Estanislao; Avignone, Frank T.; Barabash, Alexander; Bertrand, F.; Boswell, M.; Brudanin, V.; Busch, Matthew; Byram, D.; Caldwell, A. S.; Chan, Yuen-Dat; Christofferson, Cabot-Ann; Combs, Dustin C.; Cuesta, C.; Detwiler, Jason A.; Doe, P. J.; Efremenko, Yuri; Egorov, Viatcheslav; Ejiri, H.; Elliott, S. R.; Fast, James E.; Finnerty, P.; Fraenkle, Florian; Galindo-Uribarri, A.; Giovanetti, G. K.; Goett, J.; Gruszko, J.; Guiseppe, Vincente; Gusev, K.; Hallin, A. L.; Hazama, R.; Hegai, A.; Henning, Reyco; Hoppe, Eric W.; Howard, Stanley; Howe, M. A.; Keeter, K.; Kidd, M. F.; Kochetov, Oleg; Konovalov, S.; Kouzes, Richard T.; Laferriere, Brian D.; Leon, Jonathan D.; Leviner, L.; Loach, J. C.; MacMullin, J.; MacMullin, S.; Martin, R. D.; Meijer, S. J.; Mertens, S.; Nomachi, Masaharu; Orrell, John L.; O' Shaughnessy, Mark D.; Overman, Nicole R.; Phillips, David; Poon, Alan; Pushkin, K.; Radford, D. C.; Rager, J.; Rielage, Keith; Robertson, R. G. H.; Romero-Romero, E.; Ronquest, M. C.; Schubert, Alexis G.; Shanks, B.; Shima, T.; Shirchenko, M.; Snavely, Kyle J.; Snyder, N.; Suriano, Anne-Marie; Thompson, J.; Timkin, V.; Tornow, Werner; Trimble, J. E.; Varner, R. L.; Vasilyev, Sergey; Vetter, Kai; Vorren, Kris R.; White, Brandon R.; Wilkerson, J. F.; Wiseman, C.; Xu, W.; Yakushev, E.; Young, A.; Yu, Chang-Hong; Yumatov, Vladimir

    2015-03-24

    The Majorana Demonstrator will search for neutrinoless-double-beta decay in 76Ge, while establishing the feasibility of a future tonne-scale germanium-based neutrinoless-double-beta decay experiment, and performing searches for new physics beyond the Standard Model. The experiment, currently under construction at the Sanford Underground Research Facility in Lead, SD, will consist of a pair of modular high-purity germanium detector arrays housed inside of a compact copper, lead, and polyethylene shield. Through a combination of strict materials qualifications and assay, low-background design, and powerful background rejection techniques, the Demonstrator aims to achieve a background rate in the neutrinoless-double-beta decay region of interest (ROI) of no more than 3cnts/(ROI-t-y). The current status of the Demonstrator is discussed, as are plans for its completion.

  16. Industrial fuel gas demonstration plant program. Construction permit. Compliance plan. (Deliverable No. 31)

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    The objective of this compliance plan is to insure that all required permits are filed and obtained prior to the start of construction of the U-gas demonstration plant. This plan addresses the permits in the following areas: construction, electrical, mechanical, plumbing, federal aviation lighting, and as-required permits. Each permit area is introduced by a brief summary of the permits required and the significant circumstances and/or conditions affecting permit acquisition. Each permit is then discussed in detail according to a format which includes the following: brief introduction of permit, responsible regulator agency, other potential reviewing agency(s), information needed for permit, filing procedures, normal review period, permit duration period, and permit fees. Copies of the actual application forms, guidelines for completing the applications, statements on required information and agency contacts are contained in the Appendices.

  17. West Valley Demonstration Project vitrification process equipment Functional and Checkout Testing of Systems (FACTS)

    Energy Technology Data Exchange (ETDEWEB)

    Carl, D.E.; Paul, J.; Foran, J.M.; Brooks, R.

    1990-09-30

    The Vitrification Facility (VF) at the West Valley Demonstration Project was designed to convert stored radioactive waste into a stable glass for disposal in a federal repository. The Functional and Checkout Testing of Systems (FACTS) program was conducted from 1984 to 1989. During this time new equipment and processes were developed, installed, and implemented. Thirty-seven FACTS tests were conducted, and approximately 150,000 kg of glass were made by using nonradioactive materials to simulate the radioactive waste. By contrast, the planned radioactive operation is expected to produce approximately 500,000 kg of glass. The FACTS program demonstrated the effectiveness of equipment and procedures in the vitrification system, and the ability of the VF to produce quality glass on schedule. FACTS testing also provided data to validate the WVNS waste glass qualification method and verify that the product glass would meet federal repository acceptance requirements. The system was built and performed to standards which would have enabled it to be used in radioactive service. As a result, much of the VF tested, such as the civil construction, feed mixing and holding vessels, and the off-gas scrubber, will be converted for radioactive operation. The melter was still in good condition after being at temperature for fifty-eight of the sixty months of FACTS. However, the melter exceeded its recommended design life and will be replaced with a similar melter. Components that were not designed for remote operation and maintenance will be replaced with remote-use items. The FACTS testing was accomplished with no significant worker injury or environmental releases. During the last FACTS run, the VF processes approximated the remote-handling system that will be used in radioactive operations. Following this run the VF was disassembled for conversion to a radioactive process. Functional and checkout testing of new components will be performed prior to radioactive operation.

  18. Detailed Test Plan Redundant Sensor Strapdown IMU Evaluation Program

    Science.gov (United States)

    Hartwell, T.; Miyatake, Y.; Wedekind, D. E.

    1971-01-01

    The test plan for a redundant sensor strapdown inertial measuring unit evaluation program is presented. The subjects discussed are: (1) test philosophy and limitations, (2) test sequence, (3) equipment specifications, (4) general operating procedures, (5) calibration procedures, (6) alignment test phase, and (7) navigation test phase. The data and analysis requirements are analyzed.

  19. A National Plan for Energy Research, Development and Demonstration: Creating Energy Choices for the Future (1976)

    Energy Technology Data Exchange (ETDEWEB)

    Seamans, Jr., Robert C. [Energy Research and Development Administration (ERDA), Washington, DC (United States)

    1976-04-15

    This is the first annual update of the initial report submitted to you in June 1975 (ERDA-48), and complies with the requirements of Section 15 of the Federal Nonnuclear Energy Research and Development Act of 1974. This report represents an evolution in approach over the previous document. ERDA's proposed National Plan has been expanded in scope and depth of coverage and the basic goals and strategy are refined, but remain essentially intact. The Plan summarizes ERDA's current views on the energy technologies the Nation will need to achieve longer-term energy independence, specifically: The paramount role of the private sector in the development and commercialization of new energy technologies is addressed; Conservation (energy efficiency) technologies are singled out for increased attention and are now ranked with several supply technologies as being of the highest priority for national action; The President's 1977 budget requests a large increase - 30% over 1976 - in funding for energy RD&D with particular emphasis on accelerating energy RD&D programs directed at achieving greater long-term energy independence, encouraging cost-sharing with private industry and avoiding the undertaking of RD&D more appropriately the responsibility of the private sector, and supporting the commercial demonstration of synthetic fuel production by providing loan guarantees beginning in FY 76; Federal programs to assist industry in accelerating the market penetration of energy technologies with near-term potential are a key element of the Plan.

  20. Ocean Thermal Energy Conversion (OTEC) platform configuration and integration. Volume III. Development plan for demonstration unit. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Scott, R. J.

    1978-06-01

    The overall purpose of this project is the conceptual design of two OTEC commercial plants. This report presents results of task VII: a plan for the development of an OTEC Demonstration Plant including funding, key milestones, fallbacks, etc. Studies include a risk assessment survey, OTEC Demonstration Plant ocean systems requirements, OTEC Demonstration plant power and transmission system requirements, electric utility survey, market assessment, and a demonstration plan. (WHK)

  1. Test plan for BWID Phase 2 electric arc melter vitrification tests

    Energy Technology Data Exchange (ETDEWEB)

    Soelberg, N.R.; Turner, P.C.; Oden, L.L.; Anderson, G.L.

    1994-10-01

    This test plan describes the Buried Waste Integrated Demonstration (BWID), Phase 2, electric arc melter, waste treatment evaluation tests to be performed at the US Bureau of Mines (USBM) Albany Research Center. The BWID Arc Melter Vitrification Project is being conducted to evaluate and demonstrate existing industrial arc melter technology for thermally treating mixed transuranic-contaminated wastes and soils. Phase 1 baseline tests, performed during fiscal year 1993 at the USBM, were conducted on waste feeds representing incinerated buried mixed wastes and soils. In Phase 2, surrogate feeds will be processed that represent actual as-retrieved buried wastes from the Idaho National Engineering Laboratory`s Subsurface Disposal Area at the Radioactive Waste Management Complex.

  2. Phase 1 Characterization sampling and analysis plan West Valley demonstration project.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R. L. (Environmental Science Division)

    2011-06-30

    The Phase 1 Characterization Sampling and Analysis Plan (CSAP) provides details about environmental data collection that will be taking place to support Phase 1 decommissioning activities described in the Phase 1 Decommissioning Plan for the West Valley Demonstration Project, Revision 2 (Phase I DP; DOE 2009). The four primary purposes of CSAP data collection are: (1) pre-design data collection, (2) remedial support, (3) post-remediation status documentation, and (4) Phase 2 decision-making support. Data collection to support these four main objectives is organized into two distinct data collection efforts. The first is data collection that will take place prior to the initiation of significant Phase 1 decommissioning activities (e.g., the Waste Management Area [WMA] 1 and WMA 2 excavations). The second is data collection that will occur during and immediately after environmental remediation in support of remediation activities. Both data collection efforts have a set of well-defined objectives that encompass the data needs of the four main CSAP data collection purposes detailed in the CSAP. The main body of the CSAP describes the overall data collection strategies that will be used to satisfy data collection objectives. The details of pre-remediation data collection are organized by WMA. The CSAP contains an appendix for each WMA that describes the details of WMA-specific pre-remediation data collection activities. The CSAP is intended to expand upon the data collection requirements identified in the Phase 1 Decommissioning Plan. The CSAP is intended to tightly integrate with the Phase 1 Final Status Survey Plan (FSSP). Data collection described by the CSAP is consistent with the FSSP where appropriate and to the extent possible.

  3. Northwest Hazardous Waste Research, Development, and Demonstration Center: Program Plan. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1988-02-01

    The Northwest Hazardous Waste Research, Development, and Demonstration Center was created as part of an ongoing federal effort to provide technologies and methods that protect human health and welfare and environment from hazardous wastes. The Center was established by the Superfund Amendments and Reauthorization Act (SARA) to develop and adapt innovative technologies and methods for assessing the impacts of and remediating inactive hazardous and radioactive mixed-waste sites. The Superfund legislation authorized $10 million for Pacific Northwest Laboratory to establish and operate the Center over a 5-year period. Under this legislation, Congress authorized $10 million each to support research, development, and demonstration (RD and D) on hazardous and radioactive mixed-waste problems in Idaho, Montana, Oregon, and Washington, including the Hanford Site. In 1987, the Center initiated its RD and D activities and prepared this Program Plan that presents the framework within which the Center will carry out its mission. Section 1.0 describes the Center, its mission, objectives, organization, and relationship to other programs. Section 2.0 describes the Center's RD and D strategy and contains the RD and D objectives, priorities, and process to be used to select specific projects. Section 3.0 contains the Center's FY 1988 operating plan and describes the specific RD and D projects to be carried out and their budgets and schedules. 9 refs., 18 figs., 5 tabs.

  4. Pilot test specific test plan for the removal of arsenic Socorro, New Mexico.

    Energy Technology Data Exchange (ETDEWEB)

    Collins, Sue S.; Aragon, Malynda Jo; Everett, Randy L.; Siegel, Malcolm Dean; Aragon, Alicia R.; Dwyer, Brian P.; Marbury, Justin Luke

    2006-03-01

    Sandia National Laboratories (SNL) is conducting pilot scale evaluations of the performance and cost of innovative drinking water treatment technologies designed to meet the new arsenic maximum contaminant level (MCL) of 10 {micro}g/L (effective January 2006). As currently envisioned, pilots tests may include multiple phases. Phase I tests will involve side-by-side comparisons of several commercial technologies primarily using design parameters suggested by the Vendors. Subsequent tests (Phase II) may involve repeating some of the original tests, testing the same commercial technologies under different conditions and testing experimental technologies or additional commercial technologies. This Pilot Test Specific Test Plan (PTSTP) was written for Phase I of the Socorro Springs Pilot. The objectives of Phase I include evaluation of the treatment performance of five adsorptive media under ambient pH conditions (approximately 8.0) and assessment of the effect of contact time on the performance of one of the media. Addenda to the PTSTP may be written to cover Phase II studies and supporting laboratory studies. The Phase I demonstration began in the winter of 2004 and will last approximately 9 months. The information from the test will help the City of Socorro choose the best arsenic treatment technology for the Socorro Springs well. The pilot demonstration is a project of the Arsenic Water Technology Partnership program, a partnership between the American Water Works Association (AWWA) Research Foundation, SNL, and WERC (A Consortium for Environmental Education and Technology Development).

  5. Fast Flux Test Facility (FFTF) standby plan

    Energy Technology Data Exchange (ETDEWEB)

    Hulvey, R.K.

    1997-03-06

    The FFTF Standby Plan, Revision 0, provides changes to the major elements and project baselines to maintain the FFTF plant in a standby condition and to continue washing sodium from irradiated reactor fuel. The Plan is consistent with the Memorandum of Decision approved by the Secretary of Energy on January 17, 1997, which directed that FFTF be maintained in a standby condition to permit the Department to make a decision on whether the facility should play a future role in the Department of Energy`s dual track tritium production strategy. This decision would be made in parallel with the intended December 1998 decision on the selection of the primary, long- term source of tritium. This also allows the Department to review the economic and technical feasibility of using the FFTF to produce isotopes for the medical community. Formal direction has been received from DOE-RL and Fluor 2020 Daniel Hanford to implement the FFTF standby decision. The objective of the Plan is maintain the condition of the FFTF systems, equipment and personnel to preserve the option for plant restart within three and one-half years of a decision to restart, while continuing deactivation work which is consistent with the standby mode.

  6. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  7. A Test Platform for Planned Field Operations Using LEGO Mindstorms NXT

    Directory of Open Access Journals (Sweden)

    Gareth Edwards

    2013-11-01

    Full Text Available Testing agricultural operations and management practices associated with different machinery, systems and planning approaches can be both costly and time-consuming. Computer simulations of such systems are used for development and testing; however, to gain the experience of real-world performance, an intermediate step between simulation and full-scale testing should be included. In this paper, a potential common framework using the LEGO Mindstorms NXT micro-tractor platform is described in terms of its hardware and software components. The performance of the platform is demonstrated and tested in terms of its capability of supporting decision making on infield operation planning. The proposed system represents the basic measures for developing a complete test platform for field operations, where route plans, mission plans, multiple-machinery cooperation strategies and machinery coordination can be executed and tested in the laboratory.

  8. What is the Nondominated Formulation? A Demonstration of de Novo Water Supply Portfolio Planning Under Deep Uncertainty

    Science.gov (United States)

    Kasprzyk, J. R.; Reed, P. M.; Characklis, G. W.; Kirsch, B. R.

    2010-12-01

    This paper proposes and demonstrates a new interactive framework for sensitivity-informed de Novo programming, in which a learning approach to formulating decision problems can confront the deep uncertainty within water management problems. The framework couples global sensitivity analysis using Sobol’ variance decomposition with multiobjective evolutionary algorithms (MOEAs) to generate planning alternatives and test their robustness to new modeling assumptions and scenarios. We explore these issues within the context of a risk-based water supply management problem, where a city seeks the most efficient use of a water market. The case study examines a single city’s water supply in the Lower Rio Grande Valley (LRGV) in Texas, using both a 10-year planning horizon and an extreme single-year drought scenario. The city’s water supply portfolio comprises a volume of permanent rights to reservoir inflows and use of a water market through anticipatory thresholds for acquiring transfers of water through optioning and spot leases. Diagnostic information from the Sobol’ variance decomposition is used to create a sensitivity-informed problem formulation testing different decision variable configurations, with tradeoffs for the formulation solved using a MOEA. Subsequent analysis uses the drought scenario to expose tradeoffs between long-term and short-term planning and illustrate the impact of deeply uncertain assumptions on water availability in droughts. The results demonstrate water supply portfolios’ efficiency, reliability, and utilization of transfers in the water supply market and show how to adaptively improve the value and robustness of our problem formulations by evolving our definition of optimality to discover key tradeoffs.

  9. Test Plan for Cask Identification Detector

    Energy Technology Data Exchange (ETDEWEB)

    Rauch, Eric Benton [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-09-29

    This document serves to outline the testing of a Used Fuel Cask Identification Detector (CID) currently being designed under the DOE-NE MPACT Campaign. A bench-scale prototype detector will be constructed and tested using surrogate neutron sources. The testing will serve to inform the design of the full detector that is to be used as a way of fingerprinting used fuel storage casks based on the neutron signature produced by the used fuel inside the cask.

  10. Long-term corrosion testing plan.

    Energy Technology Data Exchange (ETDEWEB)

    Wall, Frederick Douglas; Brown, Neil R. (Los Alamos National Laboratory, Los Alamos, NM)

    2009-02-01

    This document describes the testing and facility requirements to support the Yucca Mountain Project long-term corrosion testing program. The purpose of this document is to describe a corrosion testing program that will (a) reduce model uncertainty and variability, (b) reduce the reliance upon overly conservative assumptions, and (c) improve model defensibility. Test matrices were developed for 17 topical areas (tasks): each matrix corresponds to a specific test activity that is a subset of the total work performed in a task. A future document will identify which of these activities are considered to be performance confirmation activities. Detailed matrices are provided for FY08, FY09 and FY10 and rough order estimates are provided for FY11-17. Criteria for the selection of appropriate test facilities were developed through a meeting of Lead Lab and DOE personnel on October 16-17, 2007. These criteria were applied to the testing activities and recommendations were made for the facility types appropriate to carry out each activity. The facility requirements for each activity were assessed and activities were identified that can not be performed with currently available facilities. Based on this assessment, a total of approximately 10,000 square feet of facility space is recommended to accommodate all future testing, given that all testing is consolidated to a single location. This report is a revision to SAND2008-4922 to address DOE comments.

  11. Comparison of marine spatial planning methods in Madagascar demonstrates value of alternative approaches.

    Science.gov (United States)

    Allnutt, Thomas F; McClanahan, Timothy R; Andréfouët, Serge; Baker, Merrill; Lagabrielle, Erwann; McClennen, Caleb; Rakotomanjaka, Andry J M; Tianarisoa, Tantely F; Watson, Reg; Kremen, Claire

    2012-01-01

    The Government of Madagascar plans to increase marine protected area coverage by over one million hectares. To assist this process, we compare four methods for marine spatial planning of Madagascar's west coast. Input data for each method was drawn from the same variables: fishing pressure, exposure to climate change, and biodiversity (habitats, species distributions, biological richness, and biodiversity value). The first method compares visual color classifications of primary variables, the second uses binary combinations of these variables to produce a categorical classification of management actions, the third is a target-based optimization using Marxan, and the fourth is conservation ranking with Zonation. We present results from each method, and compare the latter three approaches for spatial coverage, biodiversity representation, fishing cost and persistence probability. All results included large areas in the north, central, and southern parts of western Madagascar. Achieving 30% representation targets with Marxan required twice the fish catch loss than the categorical method. The categorical classification and Zonation do not consider targets for conservation features. However, when we reduced Marxan targets to 16.3%, matching the representation level of the "strict protection" class of the categorical result, the methods show similar catch losses. The management category portfolio has complete coverage, and presents several management recommendations including strict protection. Zonation produces rapid conservation rankings across large, diverse datasets. Marxan is useful for identifying strict protected areas that meet representation targets, and minimize exposure probabilities for conservation features at low economic cost. We show that methods based on Zonation and a simple combination of variables can produce results comparable to Marxan for species representation and catch losses, demonstrating the value of comparing alternative approaches during

  12. Comparison of marine spatial planning methods in Madagascar demonstrates value of alternative approaches.

    Directory of Open Access Journals (Sweden)

    Thomas F Allnutt

    Full Text Available The Government of Madagascar plans to increase marine protected area coverage by over one million hectares. To assist this process, we compare four methods for marine spatial planning of Madagascar's west coast. Input data for each method was drawn from the same variables: fishing pressure, exposure to climate change, and biodiversity (habitats, species distributions, biological richness, and biodiversity value. The first method compares visual color classifications of primary variables, the second uses binary combinations of these variables to produce a categorical classification of management actions, the third is a target-based optimization using Marxan, and the fourth is conservation ranking with Zonation. We present results from each method, and compare the latter three approaches for spatial coverage, biodiversity representation, fishing cost and persistence probability. All results included large areas in the north, central, and southern parts of western Madagascar. Achieving 30% representation targets with Marxan required twice the fish catch loss than the categorical method. The categorical classification and Zonation do not consider targets for conservation features. However, when we reduced Marxan targets to 16.3%, matching the representation level of the "strict protection" class of the categorical result, the methods show similar catch losses. The management category portfolio has complete coverage, and presents several management recommendations including strict protection. Zonation produces rapid conservation rankings across large, diverse datasets. Marxan is useful for identifying strict protected areas that meet representation targets, and minimize exposure probabilities for conservation features at low economic cost. We show that methods based on Zonation and a simple combination of variables can produce results comparable to Marxan for species representation and catch losses, demonstrating the value of comparing alternative

  13. Demonstration of malaria situation analysis, stratification and planning in Minab District, southern Iran

    Institute of Scientific and Technical Information of China (English)

    Vatandoost Hassan; Rashidian Arash; Jafari Mehdi; Raeisi Ahmad; Hanafi-Bojd Ahmad Ali; Yousofzai Abdul Wali; Daryanavard Ali; Mojahedi AbdulRasool; Pakari Abbas

    2011-01-01

    Objective: To demonstrate malaria situation analysis, stratification and planning for an endemic area in southern Iran. Methods: Data on health system, population, meteorological parameters, malaria cases, anopheline vectors, and control activities during 2005-2007 was obtained from Minab Health Center, Minab Meteorological Station and published documents about malaria elements in the study area. A datasheet was created in excel 2003 for analysis. Results: There were 644 health staff working in Minab District including 99 health staff in malaria control program. The health facilities are distributed as follow: 1 hospital with 96 beds, 23 health centers including private centers (10 in Minab city and 13 in rural area of Minab District) and 119 health houses in rural areas of Minab District. Anopheles stephensi was the dominant species in Minab District, however, Anopheles dthali, Anopheles superpictus, Anopheles fluviatilis, Anophelesmulticolor, Anopheles pulcherrimus and Anopheles turkhudi can also be found in the area. Anopheles stephensi was reported susceptible to malathion, propoxur, primphos-methyl, lambda-cyhalothrin permethrin and deltamethrin, and resistant to DDT and dieldrin in the area. During the study period a total of 10 665 positive cases were reported, mainly due to local transmission (99.6%). Plasmodium vivax was the main causative agent followed by Plasmodium falciparum. There were reports about drug resistance of Plasmodium falciparum in the area. Conclusions:Using different parameters, Minab was classified into 3 strata. A plan was designed based on described goal, objectives and targets. The approaches of this plan were categorized into: health education, early detection and correct treatment, and vector control. Main constraints of these approaches are population movement between Iran, Pakistan and Afghanistan; vector control challenges at district, inadequate skilled medical staff in malaria case management and weak inter

  14. Nevada Test Site Treatment Plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Treatment Plans (STPS) are required for facilities at which the US Department of Energy (DOE) or stores mixed waste, defined by the Federal Facility Compliance Act (FFCAct) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act and a radioactive material subject to the Atomic Energy Act. On April 6, 1993, DOE published a Federal Register notice (58 FR 17875) describing its proposed process for developing the STPs in three phases including a Conceptual, a Draft, and a Proposed Site Treatment Plan (PSTP). All of the DOE Nevada Operations Office STP iterations have been developed with the state of Nevada`s input. The options and schedules reflect a ``bottoms-up`` approach and have been evaluated for impacts on other DOE sites, as well as impacts to the overall DOE program. Changes may have occurred in the preferred option and associated schedules between the PSTP, which was submitted to the state of Nevada and US Environmental Protection Agency April 1995, and the Final STP (hereafter referred to as the STP) as treatment evaluations progressed. The STP includes changes that have occurred since the submittal of the PSTP as a result of state-to-state and DOE-to-state discussions.

  15. Experimental Plan: Uranium Stabilization Through Polyphosphate Injection 300 Area Uranium Plume Treatability Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Wellman, Dawn M.; Fruchter, Jonathan S.; Vermeul, Vince R.

    2006-09-20

    This Test Plan describes a laboratory-testing program to be performed at Pacific Northwest National Laboratory (PNNL) in support of the 300-FF-5 Feasibility Study (FS). The objective of the proposed treatability test is to evaluate the efficacy of using polyphosphate injections to treat uranium contaminated groundwater in situ. This study will be used to: (1) Develop implementation cost estimates; (2) Identify implementation challenges; and (3) Investigate the technology's ability to meet remedial objectives These activities will be conducted in parallel with a limited field investigation, which is currently underway to more accurately define the vertical extent of uranium in the vadose zone, and in the capillary fringe zone laterally throughout the plume. The treatability test will establish the viability of the method and, along with characterization data from the limited field investigation, will provide the means for determining how best to implement the technology in the field. By conducting the treatability work in parallel with the ongoing Limited Field Investigation, the resulting Feasibility Study (FS) will provide proven, site-specific information for evaluating polyphosphate addition and selecting a suitable remediation strategy for the uranium plume within the FS time frame at an overall cost savings.

  16. Test results of the Phase 1 Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Hey, B.E.

    1995-03-01

    Radioactive waste materials in underground high level waste (HLW) storage tanks at the Hanford Site evolve gaseous mixtures at varying rates. In order to verify the flammability of these gases and the mechanisms by which they are produced, it is necessary to sample material from these tanks in such a way as to preserve the gas phase of the material for analysis. Careful laboratory studies could then be performed on these samples which would allow judgement to be made of the hazard level of the storage tank. The Retained Gas Sampler (RGS) system is such a sampling method. A multidisciplinary team developed and issued a plan to obtain waste tank core samples for gas phase analysis. This plan contained the basic idea and function of the RGS system. Different organizations assumed responsibility of various aspects of the RGS program which they were most qualified to develop.

  17. Test/QA Plan for Verification of Microcystin Test Kits

    Science.gov (United States)

    Microcystin test kits are used to quantitatively measure total microcystin in recreational waters. These test kits are based on enzyme-linked immunosorbent assays (ELISA) with antibodies that bind specifically to microcystins or phosphate activity inhibition where the phosphatas...

  18. Project Work Plan 100-N Area Strontium-90 Treatability Demonstration Project: Phytoremediation Along the 100-N Columbia River Riparian Zone

    Energy Technology Data Exchange (ETDEWEB)

    Ainsworth, Calvin C.

    2006-04-30

    The 100-N Area Innovative Treatment and Remediation Demonstration (ITRD) identified phyto¬remediation as a potential technology both for the removal of 90Sr from the soil of the riparian zone and as a filter for groundwater along the Columbia River. Recent greenhouse and growth chamber studies have demonstrated the viability of phytoextraction to remove 90Sr from this area’s soil/water; in conjunction with monitored natural attenuation and an apatite barrier the process would make an effective treatment for remediation of the 100-N Area 90Sr plume. All activities associated with the 100-NR-1 and 100-NR-2 Operable Units of the Hanford 100-N Area have had, and continue to have, significant regulatory and stakeholder participation. Beginning in 1998 with the ITRD process, presentations to the ITRD TAG were heavily attended by EPA, Washington State Department of Ecology, and stakeholders. In addition, three workshops have been held to receive regulatory and stakeholder feedback on monitored natural attenuation, the apatite barrier, and phytoremediation; these were held in Richland in August 2003, December 2004, and August 2005. The apatite injection treatability test plan (DOE 2005) describes phytoremediation as a technology to be evaluated during the March 2008 evaluation milestone as described in the Tri-Party Agreement change request (M-16-06-01 Change Control Form). If, during this evaluation milestone, phytoremediation is favorably evaluated it would be incorporated into the treatability test plan. The phytoremediation treatability test described in this proposal is strongly supported by the Washington State Department of Ecology.

  19. ITS strategic test plan : revision 1.0.

    Energy Technology Data Exchange (ETDEWEB)

    Franke, Brian Claude; Lorence, Leonard Joseph, Jr.; Crawford, Martin James (K-Tech Corporation, Albuquerque, NM); Cordova, Lisa A.; Kensek, Ronald Patrick; Laub, Thomas William

    2004-07-01

    This test plan describes the testing strategy for the ITS (Integrated-TIGER-Series) suite of codes. The processes and procedures for performing both verification and validation tests are described. ITS Version 5.0 was developed under the NNSA's ASC program and supports Sandia's stockpile stewardship mission.

  20. Results From The Salt Disposition Project Next Generation Solvent Demonstration Plan

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T. B.; Fondeur, F. F.; Taylor-Pashow, K. M.L.

    2014-04-02

    Strip Effluent Hold Tank (SEHT), Decontaminated Salt Solution Hold Tank (DSSHT), Caustic Wash Tank (CWT) and Solvent Hold Tank (SHT) samples were taken throughout the Next Generation Solvent (NGS) Demonstration Plan. These samples were analyzed and the results are reported. SHT: The solvent behaved as expected, with no bulk changes in the composition over time, with the exception of the TOA and TiDG. The TiDG depletion is higher than expected, and consideration must be taken on the required rate of replenishment. Monthly sampling of the SHT is warranted. If possible, additional SHT samples for TiDG analysis (only) would help SRNL refine the TiDG degradation model. CWT: The CWT samples show the expected behavior in terms of bulk chemistry. The 137Cs deposited into the CWT varies somewhat, but generally appears to be lower than during operations with the BOBCalix solvent. While a few minor organic components were noted to be present in the Preliminary sample, at this time these are thought to be artifacts of the sample preparation or may be due to the preceding solvent superwash. DSSHT: The DSSHT samples show the predicted bulk chemistry, although they point towards significant dilution at the front end of the Demonstration. The 137Cs levels in the DSSHT are much lower than during the BOBCalix operations, which is the expected observation. SEHT: The SEHT samples represent the most different output of all four of the outputs from MCU. While the bulk chemistry is as expected, something is causing the pH of the SEHT to be higher than what would be predicted from a pure stream of 0.01 M boric acid. There are several possible different reasons for this, and SRNL is in the process of investigating. Other than the pH issue, the SEHT is as predicted. In summary, the NGS Demonstration Plan samples indicate that the MCU system, with the Blend Solvent, is operating as expected. The only issue of concern regards the pH of the SEHT, and SRNL is in the process of investigating

  1. Structural Finite Element Model Updating Using Vibration Tests and Modal Analysis for NPL footbridge - SHM demonstrator

    Science.gov (United States)

    Barton, E.; Middleton, C.; Koo, K.; Crocker, L.; Brownjohn, J.

    2011-07-01

    This paper presents the results from collaboration between the National Physical Laboratory (NPL) and the University of Sheffield on an ongoing research project at NPL. A 50 year old reinforced concrete footbridge has been converted to a full scale structural health monitoring (SHM) demonstrator. The structure is monitored using a variety of techniques; however, interrelating results and converting data to knowledge are not possible without a reliable numerical model. During the first stage of the project, the work concentrated on static loading and an FE model of the undamaged bridge was created, and updated, under specified static loading and temperature conditions. This model was found to accurately represent the response under static loading and it was used to identify locations for sensor installation. The next stage involves the evaluation of repair/strengthening patches under both static and dynamic loading. Therefore, before deliberately introducing significant damage, the first set of dynamic tests was conducted and modal properties were estimated. The measured modal properties did not match the modal analysis from the statically updated FE model; it was clear that the existing model required updating. This paper introduces the results of the dynamic testing and model updating. It is shown that the structure exhibits large non-linear, amplitude dependant characteristics. This creates a difficult updating process, but we attempt to produce the best linear representation of the structure. A sensitivity analysis is performed to determine the most sensitive locations for planned damage/repair scenarios and is used to decide whether additional sensors will be necessary.

  2. Structural Finite Element Model Updating Using Vibration Tests and Modal Analysis for NPL footbridge - SHM demonstrator

    Energy Technology Data Exchange (ETDEWEB)

    Barton, E; Crocker, L [Structural health monitoring, National Physical Laboratory, Hampton Road, Teddington, Middlesex, TW11 0LW (United Kingdom); Middleton, C; Koo, K; Brownjohn, J, E-mail: elena.barton@npl.co.uk, E-mail: C.J.Middleton@sheffield.ac.uk, E-mail: k.koo@sheffield.ac.uk, E-mail: louise.crocker@npl.co.uk, E-mail: j.brownjohn@sheffield.ac.uk [University of Sheffield, Department of Civil and Structural Engineering, Vibration Engineering Research Section, Sir Frederick Mappin Building Mappin Street, Sheffield, S1 3JD (United Kingdom)

    2011-07-19

    This paper presents the results from collaboration between the National Physical Laboratory (NPL) and the University of Sheffield on an ongoing research project at NPL. A 50 year old reinforced concrete footbridge has been converted to a full scale structural health monitoring (SHM) demonstrator. The structure is monitored using a variety of techniques; however, interrelating results and converting data to knowledge are not possible without a reliable numerical model. During the first stage of the project, the work concentrated on static loading and an FE model of the undamaged bridge was created, and updated, under specified static loading and temperature conditions. This model was found to accurately represent the response under static loading and it was used to identify locations for sensor installation. The next stage involves the evaluation of repair/strengthening patches under both static and dynamic loading. Therefore, before deliberately introducing significant damage, the first set of dynamic tests was conducted and modal properties were estimated. The measured modal properties did not match the modal analysis from the statically updated FE model; it was clear that the existing model required updating. This paper introduces the results of the dynamic testing and model updating. It is shown that the structure exhibits large non-linear, amplitude dependant characteristics. This creates a difficult updating process, but we attempt to produce the best linear representation of the structure. A sensitivity analysis is performed to determine the most sensitive locations for planned damage/repair scenarios and is used to decide whether additional sensors will be necessary.

  3. Nitrate Salt Surrogate Blending Scoping Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Anast, Kurt Roy [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-11-13

    Test blending equipment identified in the “Engineering Options Assessment Report: Nitrate Salt Waste Stream Processing”. Determine if the equipment will provide adequate mixing of zeolite and surrogate salt/Swheat stream; optimize equipment type and operational sequencing; impact of baffles and inserts on mixing performance; and means of validating mixing performance

  4. Test plan and technical protocol for bioslurping

    Energy Technology Data Exchange (ETDEWEB)

    Leeson, A.; Kittel, J.A.; Hinchee, R.E. [Battelle Columbus, OH (United States); Miller, R.N.; Haas, P.E. [Air Force, Brooks AFB, TX (United States); Hoeppel, R.E. [Naval Facilities Engineering Services Center, Port Hueneme, CA (United States)

    1995-12-31

    Bioslurping is a new dynamic technology designed to efficiently recover free-floating petroleum hydrocarbons (free product) from the subsurface while simultaneously enhancing natural biodegradation of petroleum hydrocarbons in the vadose zone. Bioslurping is a vacuum-enhanced fluids-pumping technology that simultaneously extracts groundwater, free product, and soil gas in the same process stream. The US Air Force has initiated a multisite program to evaluate the widespread application of bioslurping at free-product-contaminated Air Force sites. The Air Force Bioslurper Initiative is designed to assess the field application of the bioslurping technology at 23 Air Force sites. The field studies are designed to evaluate the efficacy of bioslurping for the recovery of free-floating fuel (free product) and to evaluate the potential for bioventing to enhance natural biodegradation of petroleum contaminants. The technical approach for conducting the bioslurper pilot tests includes assessing the geologic and hydrologic characteristics of each site, free-product baildown testing in site monitoring wells, soil gas analysis, and a bioslurper pump test. The efficiency of bioslurping is compared to that of conventional skimming and dual-pump free-product recovery technologies. Bioventing potential is assessed via in situ respiration testing.

  5. AZ-101 Mixer Pump Demonstration Data Acquisition System and Gamma Cart Data Acquisition Control System Software Configuration Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    WHITE, D.A.

    1999-12-29

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the AZ1101 Mixer Pump Demonstration Data Acquisition System (DAS) and the Sludge Mobilization Cart (Gamma Cart) Data Acquisition and Control System (DACS).

  6. Fission product plateout/liftoff/washoff test plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Acharya, R.; Hanson, D.

    1988-05-01

    A test program is planned in the COMEDIE loop of the Commissariat a l`Energy Atomique (CEA), Grenoble, France, to generate integral test data for the validation of computer codes used to predict fission product transport and core corrosion in the Modular High Temperature Gas-Cooled Reactor (MHTGR). The inpile testing will be performed by the CEA under contract from the US Department of Energy (DOE); the contract will be administered by Oak Ridge National Laboratory (ORNL). The primary purpose of this test plan is to provide an overview of the proposed program in terms of the overall scope and schedule. 8 refs, 3 figs.

  7. Parking and routing information system phase 1 evaluation -- Individual evaluation test plans

    Energy Technology Data Exchange (ETDEWEB)

    Carter, R.J.

    1997-04-01

    A parking and routing information system (PARIS) is being designed and deployed at a test site on the Mountain Home Veterans Administration campus in Johnson City, Tennessee using three sensor technologies. The purpose of the PARIS project is to demonstrate innovative integration of vehicle sensing technologies with parking management strategies to improve mobility and relieve congestion associated with a growing medical/technology complex. This technical memorandum presents the four individual evaluation test plans, System Performance Individual Evaluation Test Plan, User Acceptance Individual Evaluation Test Plan, Institutional and Business Issues Individual Evaluation Test Plan, and Transportation Systems Individual Evaluation Test Plan, which were developed to support ORNL`s responsibilities and functions during the four studies. The plans define the level of effort required to satisfy the data collection, processing, and analysis requirements for the assessment of the system performance, user acceptance, institutional and business issues, and transportation systems components of the PARIS phase 1 evaluation. Each plan is divided into three subsections: executive summary, detailed study design, and study management.

  8. SuperTools Test and Evaluation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Mannos, Tom J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Mixed Signal ASIC Design

    2017-01-01

    Superconducting electronics (SCE) represents a potential path to efficient exascale computing for HPC and data center applications, but SCE-based circuit design lags far behind its CMOS equivalent. IARPA’s ongoing C3 program and its developing SuperTools program aim to jumpstart SCE R&D with the near-term goal of producing a high-speed, low-energy, 64-bit RISC processor using Josephson Junction based logic cells. SuperTools performers will develop software tools for efficient SCE design and accurate simulation and characterization of JJ-based circuits, which include the RSFQ, RQL, and AQFP logic families. T&E teams from NIST, MIT Lincoln Lab, Berkeley Lab, and Sandia National Labs will evaluate the tools and fabricate test circuits to compare with simulated results. The five-year, three-phase program includes 48 performer deliverables, three annual technical exchange meetings, and annual site visits.

  9. Test Plan for the Bearing Dust Cycle Test

    Science.gov (United States)

    Gunderson, Katelyn; Aitchison, Lindsay

    2014-01-01

    The overall objective of these experiments is to test the dust-resistant seal on the high performance glove disconnect system (HPGD), to analyze the response of the bearing to lunar regolith simulant effects.

  10. Plan for Demonstration of Online Monitoring for the Light Water Reactor Sustainability Online Monitoring Project

    Energy Technology Data Exchange (ETDEWEB)

    Magdy S. Tawfik; Vivek Agarwal; Nancy J. Lybeck

    2011-09-01

    Condition based online monitoring technologies and development of diagnostic and prognostic methodologies have drawn tremendous interest in the nuclear industry. It has become important to identify and resolve problems with structures, systems, and components (SSCs) to ensure plant safety, efficiency, and immunity to accidents in the aging fleet of reactors. The Machine Condition Monitoring (MCM) test bed at INL will be used to demonstrate the effectiveness to advancement in online monitoring, sensors, diagnostic and prognostic technologies on a pilot-scale plant that mimics the hydraulics of a nuclear plant. As part of this research project, INL will research available prognostics architectures and their suitability for deployment in a nuclear power plant. In addition, INL will provide recommendation to improve the existing diagnostic and prognostic architectures based on the experimental analysis performed on the MCM test bed.

  11. Biointrusion test plan for the Permanent Isolation Surface Barrier Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Link, S.O.; Cadwell, L.L.; Brandt, C.A.; Downs, J.L.; Rossi, R.E.; Gee, G.W.

    1994-04-01

    This document provides a testing and monitoring plan for the biological component of the prototype barrier slated for construction at the Hanford Site. The prototype barrier is an aboveground structure engineered to demonstrate the basic features of an earthen cover system. It is designed to permanently isolate waste from the biosphere. The features of the barrier include multiple layers of soil and rock materials and a low-permeability asphalt sublayer. The surface of the barrier consists of silt loam soil, covered with plants. The barrier sides are reinforced with rock or coarse earthen-fill to protect against wind and water erosion. The sublayers inhibit plant and animal intrusion and percolation of water. A series of tests will be conducted on the prototype barrier over the next several years to evaluate barrier performance under extreme climatic conditions. Plants and animals will play a significant role in the hydrologic and water and wind erosion characteristics of the prototype barrier. Studies on the biological component of the prototype barrier will include work on the initial revegetation of the surface, continued monitoring of the developing plant community, rooting depth and dispersion in the context of biointrusion potential, the role of plants in the hydrology of the surface and toe regions of the barrier, the role of plants in stabilizing the surface against water and wind erosion, and the role of burrowing animals in the hydrology and water and wind erosion of the barrier.

  12. LS1 Report: testing Plan B

    CERN Multimedia

    Anaïs Schaeffer & Katarina Anthony

    2014-01-01

    A team from the TE Department is currently testing the secondary electrical network for the LHC’s main dipoles – that is, the power circuit used in the event of a quench (loss of superconductivity). This secondary network is essential for the safety of the machine and has been strengthened as part of the SMACC project (see here).   In event of a quench, the current travels via a secondary circuit (in yellow). In order to reach an energy of 6.5 TeV per beam, the LHC will need to be supplied with an electrical current of 11 kA. While the machine’s dozens of kilometres of superconducting cables usually transport the current without any problems (i.e. with no electrical resistance), quenches can sometimes occur as a result of instabilities that cause a loss of superconductivity. In this case, the current travels via a secondary circuit, a short back-up network:  diodes that divert the current if the quench occurs in a magnet and copper bars ...

  13. Flammable gas interlock spoolpiece flow response test plan and procedure

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, T.C., Fluor Daniel Hanford

    1997-02-13

    The purpose of this test plan and procedure is to test the Whittaker electrochemical cell and the Sierra Monitor Corp. flammable gas monitors in a simulated field flow configuration. The sensors are used on the Rotary Mode Core Sampling (RMCS) Flammable Gas Interlock (FGI), to detect flammable gases, including hydrogen and teminate the core sampling activity at a predetermined concentration level.

  14. Experimental Test Plan DOE Tidal and River Reference Turbines

    Energy Technology Data Exchange (ETDEWEB)

    Neary, Vincent S [ORNL; Hill, Craig [St. Anthony Falls Laboratory, 2 Third Avenue SE, Minneapolis, MN 55414; Chamorro, Leonardo [St. Anthony Falls Laboratory, 2 Third Avenue SE, Minneapolis, MN 55414; Gunawan, Budi [ORNL

    2012-09-01

    Our aim is to provide details of the experimental test plan for scaled model studies in St. Anthony Falls Laboratory (SAFL) Main Channel at the University of Minnesota, including a review of study objectives, descriptions of the turbine models, the experimental set-up, instrumentation details, instrument measurement uncertainty, anticipated experimental test cases, post-processing methods, and data archiving for model developers.

  15. Nevada Test Site-Directed Research, Development, and Demonstration. FY2005 report

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Will [comp.

    2006-09-01

    The Nevada Test Site-Directed Research, Development, and Demonstration (SDRD) program completed a very successful year of research and development activities in FY 2005. Fifty new projects were selected for funding this year, and five FY 2004 projects were brought to conclusion. The total funds expended by the SDRD program were $5.4 million, for an average per project cost of just under $100,000. Two external audits of SDRD accounting practices were conducted in FY 2005. Both audits found the program's accounting practices consistent with the requirements of DOE Order 413.2A, and one included the observation that the NTS contractor ''did an exceptional job in planning and executing year-start activities.'' Highlights for the year included: the filing of 18 invention disclosures for intellectual property generated by FY 2005 projects; programmatic adoption of 17 FY 2004 SDRD-developed technologies; participation in the tri-lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2005 projects; and the successful completion of 55 R&D projects, as presented in this report.

  16. Test Plan for the Boiling Water Reactor Dry Cask Simulator

    Energy Technology Data Exchange (ETDEWEB)

    Durbin, Samuel [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Lindgren, Eric R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-11-01

    The thermal performance of commercial nuclear spent fuel dry storage casks are evaluated through detailed numerical analysis . These modeling efforts are completed by the vendor to demonstrate performance and regulatory compliance. The calculations are then independently verified by the Nuclear Regulatory Commission (NRC). Carefully measured data sets generated from testing of full sized casks or smaller cask analogs are widely recognized as vital for validating these models. Recent advances in dry storage cask designs have significantly increased the maximum thermal load allowed in a cask in part by increasing the efficiency of internal conduction pathways and by increasing the internal convection through greater canister helium pressure. These same vertical, canistered cask systems rely on ventilation between the canister and the overpack to convect heat away from the canister to the environment for both above and below-ground configurations. While several testing programs have been previously conducted, these earlier validation attempts did not capture the effects of elevated helium pressures or accurately portray the external convection of above-ground and below-ground canistered dry cask systems. The purpose of the investigation described in this report is to produce a data set that can be used to test the validity of the assumptions associated with the calculations presently used to determine steady-state cladding temperatures in modern vertical, canistered dry cask systems. The BWR cask simulator (BCS) has been designed in detail for both the above-ground and below-ground venting configurations. The pressure vessel representing the canister has been designed, fabricated, and pressure tested for a maximum allowable pressure (MAWP) rating of 24 bar at 400 deg C. An existing electrically heated but otherwise prototypic BWR Incoloy-clad test assembly is being deployed inside of a representative storage basket and cylindrical pressure vessel that represents the

  17. Space Station thermal test bed status and plans

    Science.gov (United States)

    Brady, Timothy K.

    1988-01-01

    The accomplishments, current status, and future plans of the thermal test bed program for Space Station thermal management are discussed. This program is intended to support the design and development of the thermal control systems for the Space Station. The topics discussed include heat pipe radiator evaluation, modular panel tests, two-phase heat transport, and testing of thermal buses using ammonia as the working fluid.

  18. Accelerated testing statistical models, test plans, and data analysis

    CERN Document Server

    Nelson, Wayne B

    2009-01-01

    The Wiley-Interscience Paperback Series consists of selected books that have been made more accessible to consumers in an effort to increase global appeal and general circulation. With these new unabridged softcover volumes, Wiley hopes to extend the lives of these works by making them available to future generations of statisticians, mathematicians, and scientists. "". . . a goldmine of knowledge on accelerated life testing principles and practices . . . one of the very few capable of advancing the science of reliability. It definitely belongs in every bookshelf on engineering.""-Dev G.

  19. Performance Demonstration Program Plan for Nondestructive Assay of Boxed Wastes for the TRU Waste Characterization Program

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-10-01

    Each testing and analytical facility performing waste characterization activities for the Waste Isolation Pilot Plant (WIPP) participates in the Performance Demonstration Program (PDP) to comply with the Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC) (DOE/WIPP-02-3122) and the Quality Assurance Program Document (QAPD) (CBFO-94-1012). The PDP serves as a quality control check for data generated in the characterization of waste destined for WIPP. Single-blind audit samples are prepared and distributed to each of the facilities participating in the PDP. Different PDPs evaluate the analyses of simulated headspace gases (HSGs), constituents of the Resource Conservation and Recovery Act (RCRA), and transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques.

  20. Integrated DWPF Melter System (IDMS) campaign report: Hanford Waste Vitrification Plan (HWVP) process demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Hutson, N.D.

    1992-08-10

    Vitrification facilities are being developed worldwide to convert high-level nuclear waste to a durable glass form for permanent disposal. Facilities in the United States include the Department of Energy`s Defense Waste Processing Facility (DWPF) at the Savannah River Site, the Hanford Waste Vitrification Plant (HWVP) at the Hanford Site and the West Valley Demonstration Project (WVDP) at West Valley, NY. At each of these sites, highly radioactive defense waste will be vitrified to a stable borosilicate glass. The DWPF and WVDP are near physical completion while the HWVP is in the design phase. The Integrated DWPF Melter System (IDMS) is a vitrification test facility at the Savannah River Technology Center (SRTC). It was designed and constructed to provide an engineering-scale representation of the DWPF melter and its associated feed preparation and off-gas treatment systems. Because of the similarities of the DWPF and HWVP processes, the IDMS facility has also been used to characterize the processing behavior of a reference NCAW simulant. The demonstration was undertaken specifically to determine material balances, to characterize the evolution of offgas products (especially hydrogen), to determine the effects of noble metals, and to obtain general HWVP design data. The campaign was conducted from November, 1991 to February, 1992.

  1. X-51A Scramjet Demonstrator Program: Waverider Ground and Flight Test

    Science.gov (United States)

    2013-11-01

    USAF) WaveRider program. The overall test objective of the X-51A program was to demonstrate a scramjet engine using endothermic hydrocarbon fuel...Hypersonic Technology (HyTech) scramjet engine , integrated into the vehicle, used endothermic hydrocarbon fuel (JP-7). The X-51A was designed to be...unlimited, 412TW-PA-13417 X-51A SCRAMJET DEMONSTRATOR PROGRAM: WAVERIDER GROUND AND FLIGHT TEST Maj Christopher M. Rondeau Chief Flight Test Engineer

  2. Field Jet Erosion Tests on the Mississippi River Collocated Demonstration Section, Plaquemines Parish, Louisiana

    Science.gov (United States)

    2015-06-01

    ER D C/ G SL T R- 15 -1 3 Field Jet Erosion Tests on the Mississippi River Collocated Demonstration Section, Plaquemines Parish...default. ERDC/GSL TR-15-13 June 2015 Field Jet Erosion Tests on the Mississippi River Collocated Demonstration Section, Plaquemines Parish...Prepared for U.S. Army Corps of Engineers Washington, DC 20314-1000 ERDC/GSL TR-15-13 ii Abstract Field jet erosion tests (JETs) were

  3. Improved Test Planning and Analysis Through the Use of Advanced Statistical Methods

    Science.gov (United States)

    Green, Lawrence L.; Maxwell, Katherine A.; Glass, David E.; Vaughn, Wallace L.; Barger, Weston; Cook, Mylan

    2016-01-01

    The goal of this work is, through computational simulations, to provide statistically-based evidence to convince the testing community that a distributed testing approach is superior to a clustered testing approach for most situations. For clustered testing, numerous, repeated test points are acquired at a limited number of test conditions. For distributed testing, only one or a few test points are requested at many different conditions. The statistical techniques of Analysis of Variance (ANOVA), Design of Experiments (DOE) and Response Surface Methods (RSM) are applied to enable distributed test planning, data analysis and test augmentation. The D-Optimal class of DOE is used to plan an optimally efficient single- and multi-factor test. The resulting simulated test data are analyzed via ANOVA and a parametric model is constructed using RSM. Finally, ANOVA can be used to plan a second round of testing to augment the existing data set with new data points. The use of these techniques is demonstrated through several illustrative examples. To date, many thousands of comparisons have been performed and the results strongly support the conclusion that the distributed testing approach outperforms the clustered testing approach.

  4. F-4 Beryllium Rudders; A Precis of the Design, Fabrication, Ground and Flight Test Demonstrations

    Science.gov (United States)

    1975-05-01

    Stress concentration factor KIPS (1000 pounds) per square inch Applied moment (usually a Ending moment) Cycles to failure in fatigue; number...Beryllium rudder assembly. A- TEST 2- RUDDER ULTIMATE STATIC TEST WITH MAXIMUM AIRLOAD AT W„ THORn The objective of this test was to demonstrate

  5. Drop Tower tests in preparation of a Tethered Electromagnetic Docking space demonstration

    Science.gov (United States)

    Olivieri, Lorenzo; Francesconi, Alessandro; Antonello, Andrea; Bettiol, Laura; Branz, Francesco; Duzzi, Matteo; Mantellato, Riccardo; Sansone, Francesco; Savioli, Livia

    2016-07-01

    A group of students of the University of Padova is recently developing some technologies to implement a Tethered Electromagnetic Docking (TED) experiment, a novel system for close rendezvous and mating manoeuvres between two spacecraft, consisting in a small tethered probe ejected by the chaser and magnetically guided by a receiving electromagnet mounted on the target. Because of the generated magnetic field, automatic self-alignment and mating are possible; then, as the tether is rewinded, the chaser is able to dock with the target. This concept allows to simplify standard docking procedures, thanks to the reduction of proximity navigation and guidance requirements, as well as consequent fuel reduction. Other interesting applications are expected, from active debris removal to space tugging; in particular, the utilization of the tethered connection for detumbling operations is considered. The realization of a space demonstrator requires a preliminary verification of the critical technologies employed in TED, in particular the magnetic guidance and the probe deploy and retrieve; in the framework of ESA "Drop your Thesis!" 2014 and 2016 campaigns the experiments FELDs (Flexible Electromagnetic Leash Docking system) and STAR (System for Tether Automatic Retrieval) have been focused on the test of such critical elements in the relevant microgravity environment of ZARM Drop Tower in Bremen. In particular, FELDs consisted in a simplified model of TED with a magnetic target interface, a passive tethered probe and its launch system: the experiment allowed to assess the passive self-alignment of the probe with respect to the target and to study the effect of friction between the tether and the release system. Similarly, STAR is investigating the tether actively controlled deployment and retrieval, with the experiment campaign planned on November 2016. In addition, another microgravity experiment is in preparation for the investigation of active magnetic navigation: PACMAN

  6. Drug testing for multiemployer plans: choosing the proper legal structure.

    Science.gov (United States)

    Barlament, John L

    2004-03-01

    If drug testing of employees in a multiemployer fund must be performed, how should it be funded? This article illustrates the legal issues associated with several entities often used to fund a drug-testing program, such as health and welfare funds, apprenticeship and training funds, and labor-management cooperation committees. Without such a structure, the plan administrator and others could face unnecessary risks.

  7. 2014 ITS World Congress Connected Vehicle Test Bed Demonstration Intersection Situation Data

    Data.gov (United States)

    Department of Transportation — During the 2014 ITS World Congress a demonstration of the connected vehicle infrastructure in the City of Detroit was conducted. The test site included approximately...

  8. 2014 ITS World Congress Connected Vehicle Test Bed Demonstration Traveler Situation Data

    Data.gov (United States)

    Department of Transportation — During the 2014 ITS World Congress a demonstration of the connected vehicle infrastructure in the City of Detroit was conducted. The test site included approximately...

  9. 2014 ITS World Congress Connected Vehicle Test Bed Demonstration Vehicle Situation Data

    Data.gov (United States)

    Department of Transportation — During the 2014 ITS World Congress a demonstration of the connected vehicle infrastructure in the City of Detroit was conducted. The test site included approximately...

  10. CERN Technical training 2008 - Learning for the LHC: Special Workshop demonstrating reliability with accelerated testing

    CERN Multimedia

    2008-01-01

    Larry Edson’s workshop will show examples of quantitative reliability predictions based upon accelerated testing and demonstrates that reliability testing during the prototyping phase will help ascertain product shortcomings. When these weak points are addressed and the redesigned product is re-tested, the reliability of that product will become much higher. These methodologies successfully used in industry might be exceedingly useful also for component development in particle physics where reliability is of utmost importance. This training will provide participants with the skills necessary to demonstrate reliability requirements using accelerated testing methods. The workshop will focus on accelerated test design that employs increased stress levels. This approach has the advantage of reducing test time, sample size and test facility resources. The methodologies taught are applicable to all types of stresses, spanning the electro...

  11. CERN Technical training 2008 - Learning for the LHC: Special workshop demonstrating reliability with accelerated testing

    CERN Multimedia

    2008-01-01

    Larry Edson’s workshop will show examples of quantitative reliability predictions based upon accelerated testing and demonstrate that reliability testing during the prototyping phase will help ascertain product shortcomings. When these weak points are addressed and the redesigned product is re-tested, the reliability of that product will become much higher. These methodologies successfully used in industry might be exceedingly useful also for component development in particle physics where reliability is of the utmost importance. This training will provide participants with the skills necessary to demonstrate reliability requirements using accelerated testing methods. The workshop will focus on accelerated test design that employs increased stress levels. This approach has the advantage of reducing test time, sample size and test facility resources. The methodologies taught are applicable to all types of stresses, spanning the elec...

  12. CERN Technical training 2008 - Learning for the LHC: Special Workshop demonstrating reliability with accelerated testing

    CERN Multimedia

    2008-01-01

    Larry Edson’s workshop will show examples of quantitative reliability predictions based upon accelerated testing and demonstrate that reliability testing during the prototyping phase will help ascertain product shortcomings. When these weak points are addressed and the redesigned product is re-tested, the reliability of that product will become much higher. These methodologies successfully used in industry might be exceedingly useful also for component development in particle physics where reliability is of the utmost importance. This training will provide participants with the skills necessary to demonstrate reliability requirements using accelerated testing methods. The workshop will focus on accelerated test design that employs increased stress levels. This approach has the advantage of reducing test time, sample size and test facility resources. The methodologies taught are applicable to all types of stresses, spanning the elec...

  13. The Five-Year Strategic Plan for Pilots, Demonstration Research and Evaluations, July 2000-June 2005.

    Science.gov (United States)

    Van Horn, Carl; Fichtner, Aaron; Altman, Jennifer; Whittaker, Julie

    This report contains the strategic vision for the Department of Labor (DOL)/Employment and Training Administration's research efforts for the next five years. Section I discusses the scope of the research plan and the development process. Section II is a review of literature concerning functioning of the labor market and identification of areas…

  14. Isotope Brayton ground demonstration testing and flight qualification program. Volume 1. Technical program

    Energy Technology Data Exchange (ETDEWEB)

    1974-12-09

    A proposal for the demonstration, development and production of the Isotope Brayton Flight System for space vehicles is presented with details on the technical requirements for designing and testing a ground demonstration system and on the program organization and personnel. (LCL)

  15. Classroom Demonstration of a Spot Test for Pbenylpyruvic Acid and Its Relationship to Phenylketonuria

    Science.gov (United States)

    Halkides, Christopher J.

    2004-01-01

    Classical phenylketonuria (PKU) is caused by a lack activity in the enzyme phenylalanine hydroxylase, leading to elevated concentrations of phenylalanine in the blood. A simple demonstration and three advanced demonstrations of a spot test for phenylpyruvic acid and its relationship to phenylketonuria are given.

  16. Daniel K. Inouye Solar Telescope: integration, testing, and commissioning planning

    Science.gov (United States)

    Craig, Simon; Gonzales, Kerry; Hubbard, Robert P.; Liang, Chen; Kneale, Ruth A.; McBride, William R.; Sekulic, Predrag; Williams, Timothy R.

    2016-08-01

    The Daniel K. Inouye Solar Telescope (DKIST) has been in its construction phase since 2010, anticipating the onset of the integration, test, and commissioning (IT&C) phase in early 2017, and the commencement of science verification in 2019. The works on Haleakala are progressing at a phenomenal rate and many of the various subsystems are either through or about to enter their Factory (or Laboratory) acceptance. The delays in obtaining site planning permissions, while a serious issue for Project Management, has allowed the sub-systems to develop well ahead of their required delivery to site. We have benefited from the knowledge that many sub-systems will be on site and ready for integration well before affecting the critical path. Opportunities have been presented for additional laboratory/factory testing which, while not free, significantly reduce the risks of potential delays and rework on site. From the perspective of IT&C this has provided an opportunity to develop the IT&C plans and schedules free from the pressures of imminent deployment. In this paper we describe the ongoing planning of the Integration, Testing and Commissioning (IT&C) phase of the project in particular the detailed planning phase that we are currently developing.

  17. Definition study for an extended manned test of a regenerative life support system, preliminary test plan

    Science.gov (United States)

    1971-01-01

    A preliminary plan and procedure are presented for conducting an extended manned test program for a regenerative life support system. Emphasis will be placed on elements associated with long-term system operation and long-term uninterrupted crew confinement.

  18. 40 CFR 63.5325 - What is a plan for demonstrating compliance and when must I have one in place?

    Science.gov (United States)

    2010-07-01

    ... amount of leather processed vary from source to source because of site-specific factors such as equipment... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What is a plan for demonstrating compliance and when must I have one in place? 63.5325 Section 63.5325 Protection of Environment...

  19. Test Plan: Sludge Treatment Project Corrosion Process Chemistry Follow-on Testing

    Energy Technology Data Exchange (ETDEWEB)

    Delegard, Calvin H.; Schmidt, Andrew J.; Poloski, Adam P.

    2007-08-17

    This test plan was prepared by the Pacific Northwest National Laboratory (PNNL) under contract with Fluor Hanford (FH). The test plan describes the scope and conditions to be used to perform laboratory-scale testing of the Sludge Treatment Project (STP) hydrothermal treatment of K Basin sludge. The STP, managed for the U. S. Department of Energy (DOE) by FH, was created to design and operate a process to eliminate uranium metal from the sludge prior to packaging for Waste Isolation Pilot Plant (WIPP) by using high temperature liquid water to accelerate the reaction, produce uranium dioxide from the uranium metal, and safely discharge the hydrogen. The proposed testing builds on the approach and laboratory test findings for both K Basin sludge and simulated sludge garnered during prior testing from September 2006 to March 2007. The outlined testing in this plan is designed to yield further understanding of the nature of the chemical reactions, the effects of compositional and process variations and the effectiveness of various strategies to mitigate the observed high shear strength phenomenon observed during the prior testing. These tests are designed to provide process validation and refinement vs. process development and design input. The expected outcome is to establish a level of understanding of the chemistry such that successful operating strategies and parameters can be implemented within the confines of the existing STP corrosion vessel design. In July 2007, the DOE provided direction to FH regarding significant changes to the scope of the overall STP. As a result of the changes, FH directed PNNL to stop work on most of the planned activities covered in this test plan. Therefore, it is unlikely the testing described here will be performed. However, to preserve the test strategy and details developed to date, the test plan has been published.

  20. Cold-end Subsystem Testing for the Fission Power System Technology Demonstration Unit

    Science.gov (United States)

    Briggs, Maxwell; Gibson, Marc; Ellis, David; Sanzi, James

    2013-01-01

    The Fission Power System (FPS) Technology Demonstration Unit (TDU) consists of a pumped sodium-potassium (NaK) loop that provides heat to a Stirling Power Conversion Unit (PCU), which converts some of that heat into electricity and rejects the waste heat to a pumped water loop. Each of the TDU subsystems is being tested independently prior to full system testing at the NASA Glenn Research Center. The pumped NaK loop is being tested at NASA Marshall Space Flight Center; the Stirling PCU and electrical controller are being tested by Sunpower Inc.; and the pumped water loop is being tested at Glenn. This paper describes cold-end subsystem setup and testing at Glenn. The TDU cold end has been assembled in Vacuum Facility 6 (VF 6) at Glenn, the same chamber that will be used for TDU testing. Cold-end testing in VF 6 will demonstrate functionality; validated cold-end fill, drain, and emergency backup systems; and generated pump performance and system pressure drop data used to validate models. In addition, a low-cost proof-of concept radiator has been built and tested at Glenn, validating the design and demonstrating the feasibility of using low-cost metal radiators as an alternative to high-cost composite radiators in an end-to-end TDU test.

  1. 40 CFR 63.1318 - PET and polystyrene affected sources-testing and compliance demonstration provisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true PET and polystyrene affected sources-testing and compliance demonstration provisions. 63.1318 Section 63.1318 Protection of Environment...: Group IV Polymers and Resins § 63.1318 PET and polystyrene affected sources—testing and...

  2. Complete braided adsorbent for marine testing to demonstrate 3g-U/kg-adsorbent

    Energy Technology Data Exchange (ETDEWEB)

    Janke, Chris [ORNL; Yatsandra, Oyola [ORNL; Mayes, Richard [ORNL; none,; Gill, Gary [PNNL; Li-Jung, Kuo [PNNL; Wood, Jordana [PNNL; Sadananda, Das [ORNL

    2014-04-30

    ORNL has manufactured four braided adsorbents that successfully demonstrated uranium adsorption capacities ranging from 3.0-3.6 g-U/kg-adsorbent in marine testing at PNNL. Four new braided and leno woven fabric adsorbents have also been prepared by ORNL and are currently undergoing marine testing at PNNL.

  3. Flight Test Hazard Planning Near the Speed of Light

    Science.gov (United States)

    Henwood, Bart; Huete, Rod

    2007-01-01

    A viewgraph presentation describing flight test safety near the speed of light is shown. The topics include: 1) Concept; 2) Portal Content; 3) Activity to Date; 4) FTS Database Updatd FAA Program; 5) FAA Flight Test Risk Management; 6) CFR 14 Part 21.35 Current and proposed changes; 7) An Online Resource for Flight Test Safety Planning; 8) Data Gathering; 9) NTPS Role; 10) Example Maturation; 11) Many Varied Inputs; 12) Matured Stall Hazards; 13) Loss of Control Mitigations; 14) FAA Access; 15) NASA PBMA Website Link; 16) FAR Reference Search; 17) Record Field Search; 18) Keyword Search; and 19) Results of FAR Reference Search.

  4. Hanford Tank Farms Waste Certification Flow Loop Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bamberger, Judith A.; Meyer, Perry A.; Scott, Paul A.; Adkins, Harold E.; Wells, Beric E.; Blanchard, Jeremy; Denslow, Kayte M.; Greenwood, Margaret S.; Morgen, Gerald P.; Burns, Carolyn A.; Bontha, Jagannadha R.

    2010-01-01

    A future requirement of Hanford Tank Farm operations will involve transfer of wastes from double shell tanks to the Waste Treatment Plant. As the U.S. Department of Energy contractor for Tank Farm Operations, Washington River Protection Solutions anticipates the need to certify that waste transfers comply with contractual requirements. This test plan describes the approach for evaluating several instruments that have potential to detect the onset of flow stratification and critical suspension velocity. The testing will be conducted in an existing pipe loop in Pacific Northwest National Laboratory’s facility that is being modified to accommodate the testing of instruments over a range of simulated waste properties and flow conditions. The testing phases, test matrix and types of simulants needed and the range of testing conditions required to evaluate the instruments are described

  5. Project Work Plan: Hanford 100-D Area Treatability Demonstration - In Situ Biostimulation for Reducing Barrier

    Energy Technology Data Exchange (ETDEWEB)

    Fruchter, Jonathan S.; Truex, Michael J.; Vermeul, Vince R.; Long, Philip E.

    2006-05-31

    This work plan supports a new, integrated approach to accelerate cleanup of chromium in the Hanford 100 Areas. This new approach will provide supplemental treatment upgradient of the ISRM barrier by directly treating chromium and other oxidizing species in groundwater (i.e., nitrate and dissolved oxygen), thereby increasing the longevity of the ISRM barrier and protecting the ecological receptors and human health at the river boundary.

  6. INEL test plan for evaluating waste assay systems

    Energy Technology Data Exchange (ETDEWEB)

    Mandler, J.W.; Becker, G.K.; Harker, Y.D.; Menkhaus, D.E.; Clements, T.L. Jr.

    1996-09-01

    A test bed is being established at the Idaho National Engineering Laboratory (INEL) Radioactive Waste Management Complex (RWMC). These tests are currently focused on mobile or portable radioassay systems. Prior to disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP), radioassay measurements must meet the quality assurance objectives of the TRU Waste Characterization Quality Assurance Program Plan. This test plan provides technology holders with the opportunity to assess radioassay system performance through a three-tiered test program that consists of: (a) evaluations using non-interfering matrices, (b) surrogate drums with contents that resemble the attributes of INEL-specific waste forms, and (c) real waste tests. Qualified sources containing a known mixture and range of radionuclides will be used for the non-interfering and surrogate waste tests. The results of these tests will provide technology holders with information concerning radioassay system performance and provide the INEL with data useful for making decisions concerning alternative or improved radioassay systems that could support disposal of waste at WIPP.

  7. An Overview of the NASA Aeronautics Test Program Strategic Plan

    Science.gov (United States)

    Marshall, Timothy J.

    2010-01-01

    U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD), however an overarching strategy for management of these national assets was needed. Therefore, in Fiscal Year (FY) 2006 NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD Test Resources Management Center (TRMC), stewards of the DoD test and evaluation infrastructure. Since then, approximately seventy percent of the ATP budget has been directed to underpin fixed and variable costs of facility operations within its portfolio and the balance towards strategic investments in its test facilities, including maintenance and capability upgrades. Also, a strong guiding coalition was established through the National Partnership for Aeronautics Testing (NPAT), with governance by the senior leadership of NASA s Aeronautics Research Mission Directorate (ARMD) and the DoD's TRMC. As part of its strategic planning, ATP has performed or participated in many studies and analyses, including assessments of major NASA and DoD aeronautics test capabilities, test facility condition evaluations and market research. The ATP strategy has also benefitted from unpublished RAND research and analysis by Ant n et al. (2009). Together, these various studies, reports and assessments serve as a foundation for a new, five year strategic plan that will guide ATP through FY 2014. Our vision for the future is a balanced

  8. A Collaborative Web-Based Approach to Planning Research, Integration, and Testing Using a Wiki

    Science.gov (United States)

    Delaney, Michael M.; Koshimoto, Edwin T.; Noble, Deleena; Duggan, Christopher

    2010-01-01

    The National Aeronautics and Space Administration Integrated Vehicle Health Management program touches on many different research areas while striving to enable the automated detection, diagnosis, prognosis, and mitigation of adverse events at the aircraft and system level. At the system level, the research focus is on the evaluation of multidisciplinary integrated methods, tools, and technologies for achieving the program goal. The participating program members form a diverse group of government, industry, and academic researchers. The program team developed the Research and Test Integration Plan in order to track significant test and evaluation activities, which are important for understanding, demonstrating, and communicating the overall project state and project direction. The Plan is a living document, which allows the project team the flexibility to construct conceptual test scenarios and to track project resources. The Plan also incorporates several desirable feature requirements for Plan users and maintainers. A wiki has proven to be the most efficient and effective means of implementing the feature requirements for the Plan. The wiki has proven very valuable as a research project management tool, and there are plans to expand its scope.

  9. Ground testing and flight demonstration of charge management of insulated test masses using UV-LED electron photoemission

    Science.gov (United States)

    Saraf, Shailendhar; Buchman, Sasha; Balakrishnan, Karthik; Lui, Chin Yang; Soulage, Michael; Faied, Dohy; Hanson, John; Ling, Kuok; Jaroux, Belgacem; Suwaidan, Badr Al; AlRashed, Abdullah; Al-Nassban, Badr; Alaqeel, Faisal; Harbi, Mohammed Al; Salamah, Badr Bin; Othman, Mohammed Bin; Qasim, Bandar Bin; Alfauwaz, Abdulrahman; Al-Majed, Mohammed; DeBra, Daniel; Byer, Robert

    2016-12-01

    The UV-LED mission demonstrates the precise control of the potential of electrically isolated test masses. Test mass charge control is essential for the operation of space accelerometers and drag-free sensors which are at the core of geodesy, aeronomy and precision navigation missions as well as gravitational wave experiments and observatories. Charge management using photoelectrons generated by the 254 nm UV line of Hg was first demonstrated on Gravity Probe B and is presently part of the LISA Pathfinder technology demonstration. The UV-LED mission and prior ground testing demonstrates that AlGaN UVLEDs operating at 255 nm are superior to Hg lamps because of their smaller size, lower power draw, higher dynamic range, and higher control authority. We show laboratory data demonstrating the effectiveness and survivability of the UV-LED devices and performance of the charge management system. We also show flight data from a small satellite experiment that was one of the payloads on KACST’s SaudiSat-4 mission that demonstrates ‘AC charge control’ (UV-LEDs and bias are AC modulated with adjustable relative phase) between a spherical test mass and its housing. The result of the mission brings the UV-LED device Technology Readiness Level (TRL) to TRL-9 and the charge management system to TRL-7. We demonstrate the ability to control the test mass potential on an 89 mm diameter spherical test mass over a 20 mm gap in a drag-free system configuration, with potential measured using an ultra-high impedance contact probe. Finally, the key electrical and optical characteristics of the UV-LEDs showed less than 7.5% change in performance after 12 months in orbit.

  10. Electromagnetic Interference/Compatibility (EMI/EMC) Control Test and Measurement Facility: User Test Planning Guide

    Science.gov (United States)

    Scully, Robert C.

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the EMI/EMC Test Facility. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  11. Test Plan Development for Plastic Ammunition Containers. Volume 1

    Science.gov (United States)

    1989-03-15

    122 xii TEST PLAN DEVELOPMENT FOR PLASTIC AM4MINITION CONTAINERS - VOLUME I 1.0 INTRODUCTION The purpose of this project...11 LA 00 Li C:0 z CP -0 133 0( LIE r r ’ D2 U)~ E C IP a g 0- L) LaLn 4’ MOIAIV3H-Q3.~f-trCYin, 20o Tabla 6-D Performance Prediction Model 155ram

  12. System integration test plan for HANDI 2000 business management system

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, D.

    1998-08-24

    This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.

  13. T Tank Farm Interim Surface Barrier Demonstration--Vadose Zone Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Z. F.; Keller, Jason M.; Strickland, Christopher E.

    2007-04-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank in 1973. Many of the contaminants from that leak still reside within the vadose zone beneath the T Tank Farm. CH2M Hill Hanford Group, Inc. seeks to minimize movement of this residual contaminant plume by placing an interim barrier on the surface. Such a barrier is expected to prevent infiltrating water from reaching the plume and moving it further. A plan has been prepared to monitor and determine the effectiveness of the interim surface barrier. Soil water content and water pressure will be monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. In fiscal year 2006, two instrument nests were installed. Each instrument nest contains a neutron probe access tube, a capacitance probe, four heat-dissipation units, and a drain gauge to measure soil water flux. A meteorological station has been installed outside of the fence. In fiscal year 2007, two additional instrument nests are planned to be installed beneath the proposed barrier.

  14. Ground Testing and Flight Demonstration of Charge Management of Insulated Test Masses Using UV LED Electron Photoemission

    OpenAIRE

    Saraf, Shailendhar; Buchman, Sasha; Balakrishnan, Karthik; Lui, Chin Yang; Soulage, Michael; Faied, Dohy; Hanson, John; Ling, Kuok; Jaroux, Belgacem; AlRashed, Abdullah; Nassban, Badr Al; Suwaidan, Badr Al; Harbi, Mohammed Al; Salamah, Badr Bin; Othman, Mohammed Bin

    2016-01-01

    The UV LED mission demonstrates the precise control of the potential of electrically isolated test masses that is essential for the operation of space accelerometers and drag free sensors. Accelerometers and drag free sensors were and remain at the core of geodesy, aeronomy, and precision navigation missions as well as gravitational science experiments and gravitational wave observatories. Charge management using photoelectrons generated by the 254 nm UV line of Hg was first demonstrated on G...

  15. Criticality Safety Evaluation for the Advanced Test Reactor U-Mo Demonstration Elements

    Energy Technology Data Exchange (ETDEWEB)

    Leland M. Montierth

    2010-12-01

    The Reduced Enrichment Research Test Reactors (RERTR) fuel development program is developing a high uranium density fuel based on a (LEU) uranium-molybdenum alloy. Testing of prototypic RERTR fuel elements is necessary to demonstrate integrated fuel performance behavior and scale-up of fabrication techniques. Two RERTR-Full Size Demonstration fuel elements based on the ATR-Reduced YA elements (all but one plate fueled) are to be fabricated for testing in the Advanced Test Reactor (ATR). The two fuel elements will be irradiated in alternating cycles such that only one element is loaded in the reactor at a time. Existing criticality analyses have analyzed Standard (HEU) ATR elements (all plates fueled) from which controls have been derived. This criticality safety evaluation (CSE) documents analysis that determines the reactivity of the Demonstration fuel elements relative to HEU ATR elements and shows that the Demonstration elements are bound by the Standard HEU ATR elements and existing HEU ATR element controls are applicable to the Demonstration elements.

  16. Update of the 2 Kw Solar Dynamic Ground Test Demonstration Program

    Science.gov (United States)

    Shaltens, Richard K.; Boyle, Robert V.

    1994-01-01

    The Solar Dynamic (SD) Ground Test Demonstration (GTD) program demonstrates the operation of a complete 2 kW, SD system in a simulated space environment at a NASA Lewis Research Center (LeRC) thermal-vacuum facility. This paper reviews the goals and status of the SD GTD program. A brief description of the SD system identifying key design features of the system, subsystems, and components is included. An aerospace industry/government team is working together to design, fabricate, assemble, and test a complete SD system.

  17. U.S. Department of Energy -- Advanced Vehicle Testing Activity: Plug-in Hybrid Electric Vehicle Testing and Demonstration Activities

    Energy Technology Data Exchange (ETDEWEB)

    James E. Francfort; Donald Karner; John G. Smart

    2009-05-01

    The U.S. Department of Energy’s (DOE) Advanced Vehicle Testing Activity (AVTA) tests plug-in hybrid electric vehicles (PHEV) in closed track, dynamometer and onroad testing environments. The onroad testing includes the use of dedicated drivers on repeated urban and highway driving cycles that range from 10 to 200 miles, with recharging between each loop. Fleet demonstrations with onboard data collectors are also ongoing with PHEVs operating in several dozen states and Canadian Provinces, during which trips- and miles-per-charge, charging demand and energy profiles, and miles-per-gallon and miles-per-kilowatt-hour fuel use results are all documented, allowing an understanding of fuel use when vehicles are operated in charge depleting, charge sustaining, and mixed charge modes. The intent of the PHEV testing includes documenting the petroleum reduction potential of the PHEV concept, the infrastructure requirements, and operator recharging influences and profiles. As of May 2008, the AVTA has conducted track and dynamometer testing on six PHEV conversion models and fleet testing on 70 PHEVs representing nine PHEV conversion models. A total of 150 PHEVs will be in fleet testing by the end of 2008, all with onboard data loggers. The onroad testing to date has demonstrated 100+ miles per gallon results in mostly urban applications for approximately the first 40 miles of PHEV operations. The primary goal of the AVTA is to provide advanced technology vehicle performance benchmark data for technology modelers, research and development programs, and technology goal setters. The AVTA testing results also assist fleet managers in making informed vehicle purchase, deployment and operating decisions. The AVTA is part of DOE’s Vehicle Technologies Program. These AVTA testing activities are conducted by the Idaho National Laboratory and Electric Transportation Engineering Corporation, with Argonne National Laboratory providing dynamometer testing support. The proposed paper

  18. Non-Flow-Through Fuel Cell System Test Results and Demonstration on the SCARAB Rover

    Science.gov (United States)

    Scheidegger, Brianne, T.; Burke, Kenneth A.; Jakupca, Ian J.

    2012-01-01

    This paper describes the results of the demonstration of a non-flow-through PEM fuel cell as part of a power system on the SCARAB rover. A 16-cell non-flow-through fuel cell stack from Infinity Fuel Cell and Hydrogen, Inc. was incorporated into a power system designed to act as a range extender by providing power to the rover s hotel loads. This work represents the first attempt at a ground demonstration of this new technology aboard a mobile test platform. Development and demonstration were supported by the Office of the Chief Technologist s Space Power Systems Project and the Advanced Exploration System Modular Power Systems Project.

  19. Experimental Test Plan for Grouting H-3 Calcine

    Energy Technology Data Exchange (ETDEWEB)

    Alan K. Herbst

    2006-01-01

    Approximately 4400 cubic meters of solid high-level waste called calcine are stored at the Idaho Nuclear Technology and Engineering Center. Under the Idaho Cleanup Project, dual disposal paths are being investigated. The first path includes calcine retrieval, package "as-is", and ship to the Monitored Geological Repository (MGR). The second path involves treatment of the calcine with such methods as vitrification or grouting. This test plan outlines the hot bench scale tests to grout actual calcine and verify that the waste form properties meet the waste acceptance criteria. This is a necessary sequential step in the process of qualifying a new waste form for repository acceptance. The archive H-3 calcine samples at the Contaminated Equipment Maintenance Building attached to New Waste Calcining Facility will be used in these tests at the Remote Analytical Laboratory. The tests are scheduled for the second quarter of fiscal year 2007.

  20. Design and Testing of a Wireless Demonstrator for Large Instrumentation Systems

    OpenAIRE

    2013-01-01

    In this proceeding, we report the development of a wireless demonstrator intended to readout instrumentation systems having thousands of channels. A data acquisition system was designed and tested based on compliant implementation of 802.11n based hardware and protocols. This project is for large detectors containing photomultiplier tubes. Both free-space optical and radio frequency techniques were tested for wireless power transfer. The front-end circuitry, including a high-voltage power sup...

  1. EPRI/DOE High Burnup Fuel Sister Pin Test Plan Simplification and Visualization

    Energy Technology Data Exchange (ETDEWEB)

    Saltzstein, Sylvia J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Sorenson, Ken B. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hanson, Brady [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Billone, Mike [Argonne National Lab. (ANL), Argonne, IL (United States); Scaglione, John [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Montgomery, Rose [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bevard, Bruce [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-07-01

    The EPRI/DOE High Burnup Confirmatory Data Project (herein called the "Demo") is a multi-year, multi-entity confirmation demonstration test with the purpose of providing quantitative and qualitative data to show how high-burnup fuel ages in dry storage over a ten-year period. The Demo involves obtaining 32 assemblies of high-burnup PWR fuel of four common cladding alloys from the North Anna Nuclear Power Plant, drying them according to standard plant procedures, and then storing them in an NRC-licensed TN-3 2B cask on the North Anna dry storage pad for ten years. After the ten-year storage time, the cask will be opened and the rods will be examined for signs of aging. Twenty-five rods from assemblies of similar claddings, in-reactor placement, and burnup histories (herein called "sister rods") have been shipped from the North Anna Nuclear Power Plant and are currently being nondestructively tested at Oak Ridge National Laboratory. After the non-destructive testing has been completed for each of the twenty-five rods, destructive analysis will be performed at ORNL, PNNL, and ANL to obtain mechanical data. Opinions gathered from the expert interviews, ORNL and PNNL Sister Rod Test Plans, and numerous meetings has resulted in the Simplified Test Plan described in this document. Some of the opinions and discussions leading to the simplified test plan are included here. Detailed descriptions and background are in the ORNL and PNNL plans in the appendices . After the testing described in this simplified test plan h as been completed , the community will review all the collected data and determine if additional testing is needed.

  2. Coal/Biomass-to-Liquids Demonstration Testing for DLA Energy: Report on Project Tests, Evaluations, and Recommendations

    Science.gov (United States)

    2015-08-20

    Wood/Coal Blends 6-91 Table 6-73: WPC Test Plan 6-92 Table 6-74: Ultimate and Chlorine Analyses of Primary Feed Components and Target MSW 6-94 Table...C16H10 pyrene C16H10 fluroanthene (same as pyrene) CaO calcium oxide CH4 methane Cl chlorine CO carbon monoxide CO2 carbon dioxide Fe2O3 iron...also used to measure trace levels of key hydrocarbons such as methane, ethylene , ethane, and propene. Draeger tubes were selectively used to measure

  3. Hot Cell Installation and Demonstration of the Severe Accident Test Station

    Energy Technology Data Exchange (ETDEWEB)

    Linton, Kory D. [ORNL; Burns, Zachary M. [ORNL; Terrani, Kurt A. [ORNL; Yan, Yong [ORNL

    2017-08-01

    A Severe Accident Test Station (SATS) capable of examining the oxidation kinetics and accident response of irradiated fuel and cladding materials for design basis accident (DBA) and beyond design basis accident (BDBA) scenarios has been successfully installed and demonstrated in the Irradiated Fuels Examination Laboratory (IFEL), a hot cell facility at Oak Ridge National Laboratory. The two test station modules provide various temperature profiles, steam, and the thermal shock conditions necessary for integral loss of coolant accident (LOCA) testing, defueled oxidation quench testing and high temperature BDBA testing. The installation of the SATS system restores the domestic capability to examine postulated and extended LOCA conditions on spent fuel and cladding and provides a platform for evaluation of advanced fuel and accident tolerant fuel (ATF) cladding concepts. This document reports on the successful in-cell demonstration testing of unirradiated Zircaloy-4. It also contains descriptions of the integral test facility capabilities, installation activities, and out-of-cell benchmark testing to calibrate and optimize the system.

  4. 78 FR 67090 - Approval and Promulgation of Implementation Plans; Florida: Non-interference Demonstration for...

    Science.gov (United States)

    2013-11-08

    ... Demonstration for Removal of Federal Low-Reid Vapor Pressure Requirement AGENCY: Environmental Protection Agency... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION... continue to maintain the 1997 8-hour ozone standard if the currently applicable Federal Reid Vapor Pressure...

  5. Demonstration Report for Visual Sample Plan (VSP) Verification Sampling Methods at the Navy/DRI Site

    Science.gov (United States)

    2011-08-01

    time kinematic ( RTK ) global positioning system ( GPS ) performed anomaly reacquisition. The procedure for reacquiring the location of the anomalies was...load the target anomalies onto the RTK GPS positioning system in the correct format, and 3. place a non-metallic pin flag marked with the unique...Demonstrate the utility of the PRV sampling modules and gain regulator acceptance

  6. Initial results from the Solar Dynamic (SD) Ground Test Demonstration (GTD) project at NASA Lewis

    Science.gov (United States)

    Shaltens, Richard K.; Boyle, Robert V.

    1995-01-01

    A government/industry team designed, built, and tested a 2 kWe solar dynamic space power system in a large thermal/vacuum facility with a simulated sun at the NASA Lewis Research Center. The Lewis facility provides an accurate simulation of temperatures, high vacuum, and solar flux as encountered in low earth orbit. This paper reviews the goals and status of the Solar Dynamic (SD) Ground Test Demonstration (GTD) program and describes the initial testing, including both operational and performance data. This SD technology has the potential as a future power source for the International Space Station Alpha.

  7. Testing, development and demonstration of large scale solar district heating systems

    DEFF Research Database (Denmark)

    Furbo, Simon; Fan, Jianhua; Perers, Bengt

    2015-01-01

    In 2013-2014 the project “Testing, development and demonstration of large scale solar district heating systems” was carried out within the Sino-Danish Renewable Energy Development Programme, the so called RED programme jointly developed by the Chinese and Danish governments. In the project Danish...... know how on solar heating plants and solar heating test technology have been transferred from Denmark to China, large solar heating systems have been promoted in China, test capabilities on solar collectors and large scale solar heating systems have been improved in China and Danish-Chinese cooperation...

  8. A demonstration project to test ecological restoration of a pinyon-juniper ecosystem

    Science.gov (United States)

    David W. Huffman; Michael T. Stoddard; Peter Z. Fule; W. Wallace Covington; H. B. Smith

    2008-01-01

    To test an approach for restoring historical stand densities and increasing plant species diversity of a pinyon-juniper ecosystem, we implemented a demonstration project at two sites (CR and GP) on the Grand Canyon-Parashant National Monument in northern Arizona. Historical records indicated that livestock grazing was intensive on the sites beginning in the late 1800s...

  9. Hanford Permanent Isolation Barrier Program: Asphalt technology test plan

    Energy Technology Data Exchange (ETDEWEB)

    Freeman, H.D.; Romine, R.A.

    1994-05-01

    The Hanford Permanent Isolation Barriers use engineered layers of natural materials to create an integrated structure with backup protective features. The objective of current designs is to develop a maintenance-free permanent barrier that isolates wastes for a minimum of 1000 years by limiting water drainage to near-zero amounts. Asphalt is being used as an impermeable water diversion layer to provide a redundant layer within the overall barrier design. Data on asphalt barrier properties in a buried environment are not available for the required 100-year time frame. The purpose of this test plan is to outline the activities planned to obtain data with which to estimate performance of the asphalt layers.

  10. PREPARE: guidelines for planning animal research and testing.

    Science.gov (United States)

    Smith, Adrian J; Clutton, R Eddie; Lilley, Elliot; Hansen, Kristine E Aa; Brattelid, Trond

    2017-01-01

    There is widespread concern about the quality, reproducibility and translatability of studies involving research animals. Although there are a number of reporting guidelines available, there is very little overarching guidance on how to plan animal experiments, despite the fact that this is the logical place to start ensuring quality. In this paper we present the PREPARE guidelines: Planning Research and Experimental Procedures on Animals: Recommendations for Excellence. PREPARE covers the three broad areas which determine the quality of the preparation for animal studies: formulation, dialogue between scientists and the animal facility, and quality control of the various components in the study. Some topics overlap and the PREPARE checklist should be adapted to suit specific needs, for example in field research. Advice on use of the checklist is available on the Norecopa website, with links to guidelines for animal research and testing, at https://norecopa.no/PREPARE .

  11. Ground Testing and Flight Demonstration of Charge Management of Insulated Test Masses Using UV LED Electron Photoemission

    CERN Document Server

    Saraf, Shailendhar; Balakrishnan, Karthik; Lui, Chin Yang; Soulage, Michael; Faied, Dohy; Hanson, John; Ling, Kuok; Jaroux, Belgacem; AlRashed, Abdullah; Nassban, Badr Al; Suwaidan, Badr Al; Harbi, Mohammed Al; Salamah, Badr Bin; Othman, Mohammed Bin; Qasim, Bandar Bin; DeBra, Daniel; Byer, Robert

    2016-01-01

    The UV LED mission demonstrates the precise control of the potential of electrically isolated test masses that is essential for the operation of space accelerometers and drag free sensors. Accelerometers and drag free sensors were and remain at the core of geodesy, aeronomy, and precision navigation missions as well as gravitational science experiments and gravitational wave observatories. Charge management using photoelectrons generated by the 254 nm UV line of Hg was first demonstrated on Gravity Probe B and is presently part of the LISA Pathfinder technology demonstration. The UV LED mission and prior ground testing demonstrates that AlGaN UV LEDs operating at 255 nm are superior to Mercury vapor lamps because of their smaller size, lower draw, higher dynamic range, and higher control authority. We show flight data from a small satellite mission on a Saudi Satellite that demonstrates AC charge control (UV LEDs and bias are AC modulated with adjustable relative phase) between a spherical test mass and its h...

  12. Standardization and demonstration of antibody-coated Candida in urine by direct immunofluorescence test.

    Science.gov (United States)

    Talwar, P; Pal, S R; Kaur, P; Kaiwar, R; Jayashree, T; Rao, M S; Vaidyanathan, S; Taiwar, P

    1986-04-01

    Acetone, carbontetrachloride, ethyl alcohol, mixture of ethyl alcohol and acetone, and heat were assessed for fixative property for direct immunofluorescent (IF) staining of antibody-coated Candida cells. The results indicated that ethyl alcohol was the most suitable fixative for the test. Antisera containing 16 units of Candida albicans type A agglutinin were found essential to get optimal detectable fluorescence of antibody-coated yeast cells. IF test showed cross reactivity between the yeasts of C. albicans and C. tropicalis. However, there was no cross reactivity with the conidia of A. flavus. The direct IF test could demonstrate antibody-coated yeast cells and pseudomycelia in deposits of urine in the direct smear. It correlated well with microscopy and culture studies. At times, it could demonstrate the antibody-coated yeasts earlier than routine significant culture. It could also differentiate the significant from non-significant fungal isolates from urine.

  13. Multiple IMU system test plan, volume 4. [subroutines for space shuttle requirements

    Science.gov (United States)

    Landey, M.; Vincent, K. T., Jr.; Whittredge, R. S.

    1974-01-01

    Operating procedures for this redundant system are described. A test plan is developed with two objectives. First, performance of the hardware and software delivered is demonstrated. Second, applicability of multiple IMU systems to the space shuttle mission is shown through detailed experiments with FDI algorithms and other multiple IMU software: gyrocompassing, calibration, and navigation. Gimbal flip is examined in light of its possible detrimental effects on FDI and navigation. For Vol. 3, see N74-10296.

  14. The 3rd irradiation test plan of DUPIC fuel

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Myung Seung; Song, K. C.; Park, J. H. and others

    2001-05-01

    The objective of the 3rd irradiation test of DUPIC fuel at the HANARO is to estimate the in-core behaviour of a DUPIC pellet that is irradiated up to more than average burnup of CANDU fuel. The irradiation of DUPIC fuel is planned to start at May 21, 2001, and will be continued at least for 8 months. The burnup of DUPIC fuel through this irradiation test is thought to be more than 7,000 MWd/tHE. The DUPIC irradiation rig instrumented with three SPN detectors will be used to accumulate the experience for the instrumented irradiation and to estimate the burnup of irradiated DUPIC fuel more accurately. Under normal operating condition, the maximum linear power of DUPIC fuel was estimated as 55.06 kW/m, and the centerline temperature of a pellet was calculated as 2510 deg C. In order to assess the integrity of DUPIC fuel under the accident condition postulated at the HANARO, safety analyses on the locked rotor and reactivity insertion accidents were carried out. The maximum centerline temperature of DUPIC fuel was estimated 2590 deg C and 2094 deg C for each accident, respectively. From the results of the safety analysis, the integrity of DUPIC fuel during the HANARO irradiation test will be secured. The irradiated DUPIC fuel will be transported to the IMEF. The post-irradiation examinations are planned to be performed at the PIEF and IMEF.

  15. Phase Startup Initiative Phases 3 and 4 Test Plan and Test Specification ( OCRWM)

    Energy Technology Data Exchange (ETDEWEB)

    PAJUNEN, A.L.; LANGEVIN, M.J.

    2000-08-07

    Construction for the Spent Nuclear Fuel (SNF) Project facilities is continuing per the Level III Baseline Schedule, and installation of the Fuel Retrieval System (FRS) and Integrated Water Treatment System (IWTS) in K West Basin is now complete. In order to accelerate the project, a phased start up strategy to initiate testing of the FRS and IWTS early in the overall project schedule was proposed (Williams 1999). Wilkinson (1999) expands the definition of the original proposal into four functional testing phases of the Phased Startup Initiative (PSI). Phases 1 and 2 are based on performing functional tests using dummy fuel. This test plan provides overall guidance for Phase 3 and 4 tests, which are performed using actual irradiated N fuel assemblies. The overall objective of the Phase 3 and 4 testing is to verify how the FRS and IWTS respond while processing actual fuel. Conducting these tests early in the project schedule will allow identification and resolution of equipment and process problems before they become activities on the start-up critical path. The specific objectives of this test plan are to: Define the Phase 3 and 4 test scope for the FRS and IWTS; Provide detailed test requirements that can be used to write the specific test procedures; Define data required and measurements to be taken. Where existing methods to obtain these do not exist, enough detail will be provided to define required additional equipment; and Define specific test objectives and acceptance criteria.

  16. Hanford Tanks Initiative alternate retrieval system demonstrations - final report of testing performed by Grey Pilgrim LLC

    Energy Technology Data Exchange (ETDEWEB)

    Berglin, E.J.

    1997-07-24

    A waste retrieval system has been defined to provide a safe and cost-effective solution to the Hanford Tanks Initiative. This system consists of the EMMA robotic manipulator (by GreyPilgrim LLC) and the lightweight Scarifier (by Waterjet Technology, Inc.) powered by a 36-kpsi Jet-Edge diesel powered high pressure pumping system. For demonstration and testing purposes, an air conveyance system was utilized to remove the waste from the simulated tank floor. The EMMA long reach manipulator utilized for this demonstration was 33 feet long. It consisted of 4 hydraulically controlled stages of varying lengths and coupling configurations. T

  17. Top-Mounted Propulsion Test Plans (TMP17)

    Science.gov (United States)

    Bridges, James; Henderson, Brenda; Huff, Dennis

    2017-01-01

    NASA recently completed a study of propulsion cycles and nozzle types applicable to a 70-passenger, M1.6 supersonic airliner, paying especial attention to the noise produced during landing and take-off. The results of the study were validated in a model-scale test at NASA Glenn last summer. The findings of that study and test, along with other studies, have resulted in a new strategy for achieving the Commercial Supersonic Technologys goals for noise and performance. Key to that strategy is moving the propulsion to the top-side of the vehicle and modifying the nozzle and inlet to maximally shield the propulsion noise while maintaining efficient operation. Installed exhaust configurations have been designed to minimize the exhaust noise using new acoustic design tools. A test planned for the fall of 2017 will validate both the new design tools and the low-noise concept using a new translating phased array. During the test, questions regarding modifications of convected waves in the jet near-field that are key to new understandings of aft jet noise will be addressed. Also, to better tie rig results to real-world measurements, a model-scale version of a nozzle that was flight tested by Glenn Research Center in 2001 will be tested.

  18. Thermal test results of the two-phase thermal bus technology demonstration loop

    Science.gov (United States)

    Edelstein, Fred; Liandris, Maria; Rankin, J. Gary

    1987-01-01

    A two-phase heat transport system, the Thermal Bus Technology Demonstrator, has been built and tested for NASA Johnson Space Center for application on Space Station. The loop is a separated two-phase system that uses evaporator flow control valves and liquid condenser flooding to achieve temperature control. Both ambient and thermal vacuum tests have been completed in NASA's Chamber A, initially using Freon-11 and then ammonia as the working fluid. Overall, the tests were quite successful, with the bus achieving all major test objectives, including operation at 19.5 kW and set points at 35 F (1.7 C), 70 F (21.1 C) and 104 F (40.0 C), load sharing, asymmetrical heating and isothermality around the loop. Low plate to vapor temperature drops were obtained for the monogroove cold plate using ammonia and are indicative of the high evaporative film coefficients obtainable with this design.

  19. Fault Sample Generation for Virtual Testability Demonstration Test Subject to Minimal Maintenance and Scheduled Replacement

    Directory of Open Access Journals (Sweden)

    Yong Zhang

    2015-01-01

    Full Text Available Virtual testability demonstration test brings new requirements to the fault sample generation. First, fault occurrence process is described by stochastic process theory. It is discussed that fault occurrence process subject to minimal repair is nonhomogeneous Poisson process (NHPP. Second, the interarrival time distribution function of the next fault event is proposed and three typical kinds of parameterized NHPP are discussed. Third, the procedure of fault sample generation is put forward with the assumptions of minimal maintenance and scheduled replacement. The fault modes and their occurrence time subject to specified conditions and time period can be obtained. Finally, an antenna driving subsystem in automatic pointing and tracking platform is taken as a case to illustrate the proposed method. Results indicate that both the size and structure of the fault samples generated by the proposed method are reasonable and effective. The proposed method can be applied to virtual testability demonstration test well.

  20. NASA solar dynamic ground test demonstration (GTD) program and its application to space nuclear power

    Science.gov (United States)

    Harper, William B.; Shaltens, Richard K.

    1993-01-01

    Closed Brayton cycle power conversion systems are readily adaptable to any heat source contemplated for space application. The inert gas working fluid can be used directly in gas-cooled reactors and coupled to a variety of heat sources (reactor, isotope or solar) by a heat exchanger. This point is demonstrated by the incorporation in the NASA 2 kWe Solar Dynamic (SD) Space Power Ground Test Demonstration (GTD) Program of the turboalternator-compressor and recuperator from the Brayton Isotope Power System (BIPS) program. This paper will review the goals and status of the SD GTD Program, initiated in April 1992. The performance of the BIPS isotope-heated system will be compared to the solar-heated GTD system incorporating the BIPS components and the applicability of the GTD test bed to dynamics space nuclear power R&D will be discussed.

  1. Acoustic conditions in open plan offices – Pilot test results

    Directory of Open Access Journals (Sweden)

    Witold Mikulski

    2016-10-01

    Full Text Available Background: The main source of noise in open plan office are conversations. Office work standards in such premises are attained by applying specific acoustic adaptation. This article presents the results of pilot tests and acoustic evaluation of open space rooms. Material and Methods: Acoustic properties of 6 open plan office rooms were the subject of the tests. Evaluation parameters, measurement methods and criterial values were adopted according to the following standards: PN-EN ISO 3382- 3:2012, PN-EN ISO 3382-2:2010, PN-B-02151-4:2015-06 and PN-B-02151-3:2015-10. Results: The reverberation time was 0.33– 0.55 s (maximum permissible value in offices – 0.6 s; the criterion was met, sound absorption coefficient in relation to 1 m2 of the room’s plan was 0.77–1.58 m2 (minimum permissible value – 1.1 m2; 2 out of 6 rooms met the criterion, distraction distance was 8.5–14 m (maximum permissible value – 5 m; none of the rooms met the criterion, A-weighted sound pressure level of speech at a distance of 4 m was 43.8–54.7 dB (maximum permissible value – 48 dB; 2 out of 6 rooms met the criterion, spatial decay rate of the speech was 1.8–6.3 dB (minimum permissible value – 7 dB; none of the rooms met the criterion. Conclusions: Standard acoustic treatment, containing sound absorbing suspended ceiling, sound absorbing materials on the walls, carpet flooring and sound absorbing workplace barriers, is not sufficient. These rooms require specific advanced acoustic solutions. Med Pr 2016;67(5:653–662

  2. Indian state plans compulsory HIV testing, segregation and branding.

    Science.gov (United States)

    Jayaraman, K S

    1998-04-01

    Health officials in the Indian state of Maharashtra have ordered the compulsory testing of all girls 12 years and older who live in designated "destitute homes." The officials also plan to tattoo a symbol on the thighs of all HIV-positive prostitutes. By April 1998, this December 1997 order had resulted in the compulsory testing of women living in 50 boarding houses and the transfer of several found to be HIV-positive to a separate institution 200 miles from the state capital. Nongovernment organizations (NGOs) have mounted a protest over this statute, but state governments in India are free to enact their own health laws. The Maharashtran government is also seeking to legalize prostitution and to force prostitutes to register with a Board that will be able to order compulsory HIV tests and tattooing. Women with HIV who continue to engage in prostitution will be quarantined, and their clients will be jailed. In response, prostitutes in the capital city of Mumbai have threatened to release a list of their client's names to the press. The only recourse available to NGOs who oppose this action is to generate a large enough public outcry to stop it. A Mumbai-based attorney noted that many private companies are also requiring HIV testing and dismissing those who test positive.

  3. TRL Assessment of Solar Sail Technology Development Following the 20-Meter System Ground Demonstrator Hardware Testing

    Science.gov (United States)

    Young, Roy M.; Adams, Charles L.

    2010-01-01

    The NASA In-Space Propulsion Technology (ISPT) Projects Office sponsored two separate, independent solar sail system design and development demonstration activities during 2002-2005. ATK Space Systems of Goleta, CA was the prime contractor for one development team and L' Garde, Inc. of Tustin, CA was the prime contractor for the other development team. The goal of these activities was to advance the technology readiness level (TRL) of solar sail propulsion from 3 towards 6 by the year 2006. Component and subsystem fabrication and testing were completed successfully, including the ground deployment of 10-meter and 20-meter demonstration hardware systems under vacuum conditions. The deployment and structural testing of the 20-meter solar sail systems was conducted in the 30 meter diameter Space Power Facility thermal-vacuum chamber at NASA Glenn Plum Brook in April though August, 2005. This paper will present the results of the TRL assessment following the solar sail technology development activities associated with the design, development, analysis and testing of the 20-meter system ground demonstrators.

  4. The Space Station Photovoltaic Panels Plasma Interaction Test Program: Test plan and results

    Science.gov (United States)

    Nahra, Henry K.; Felder, Marian C.; Sater, Bernard L.; Staskus, John V.

    1989-01-01

    The Plasma Interaction Test performed on two space station solar array panels is addressed. This includes a discussion of the test requirements, test plan, experimental set-up, and test results. It was found that parasitic current collection was insignificant (0.3 percent of the solar array delivered power). The measured arcing threshold ranged from -210 to -457 V with respect to the plasma potential. Furthermore, the dynamic response of the panels showed the panel time constant to range between 1 and 5 microsec, and the panel capacitance to be between .01 and .02 microF.

  5. The Space Station photovoltaic panels plasma interaction test program - Test plan and results

    Science.gov (United States)

    Nahra, Henry K.; Felder, Marian C.; Sater, Bernard L.; Staskus, John V.

    1990-01-01

    The plasma Interaction Test performed on two space station solar array panels is addressed. This includes a discussion of the test requirements, test plan, experimental set-up, and test results. It was found that parasitic current collection was insignificant (0.3 percent of the solar array delivered power). The measured arcing threshold ranged from -210 to -457 V with respect to the plasma potential. Furthermore, the dynamic response of the panels showed the panel time constant to range between 1 and 5 microsec, and the panel capacitance to be between .01 and .02 microF.

  6. Abbreviated sampling and analysis plan for planning decontamination and decommissioning at Test Reactor Area (TRA) facilities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-10-01

    The objective is to sample and analyze for the presence of gamma emitting isotopes and hazardous constituents within certain areas of the Test Reactor Area (TRA), prior to D and D activities. The TRA is composed of three major reactor facilities and three smaller reactors built in support of programs studying the performance of reactor materials and components under high neutron flux conditions. The Materials Testing Reactor (MTR) and Engineering Test Reactor (ETR) facilities are currently pending D/D. Work consists of pre-D and D sampling of designated TRA (primarily ETR) process areas. This report addresses only a limited subset of the samples which will eventually be required to characterize MTR and ETR and plan their D and D. Sampling which is addressed in this document is intended to support planned D and D work which is funded at the present time. Biased samples, based on process knowledge and plant configuration, are to be performed. The multiple process areas which may be potentially sampled will be initially characterized by obtaining data for upstream source areas which, based on facility configuration, would affect downstream and as yet unsampled, process areas. Sampling and analysis will be conducted to determine the level of gamma emitting isotopes and hazardous constituents present in designated areas within buildings TRA-612, 642, 643, 644, 645, 647, 648, 663; and in the soils surrounding Facility TRA-611. These data will be used to plan the D and D and help determine disposition of material by D and D personnel. Both MTR and ETR facilities will eventually be decommissioned by total dismantlement so that the area can be restored to its original condition.

  7. HFC-134A and HCFC-22 supermarket refrigeration demonstration and laboratory testing. Phase I. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    Aspen Systems and a team of nineteen agencies and industry participants conducted a series of tests to determine the performance of HFC-134a, HCFC-22, and CFC-502 for supermarket application. This effort constitutes the first phase of a larger project aimed at carrying out both laboratory and demonstration tests of the most viable HFC refrigerants and the refrigerants they replace. The results of the Phase I effort are presented in the present report. The second phase of the project has also been completed. It centered on testing all viable HFC replacement refrigerants for CFC-502. These were HFC-507, HFC-404A, and HFC-407A. The latter results are published in the Phase II report for this project. As part of Phase I, a refrigeration rack utilizing a horizontal open drive screw compressor was constructed in our laboratory. This refrigeration rack is a duplicate of one we have installed in a supermarket in Clifton Park, NY.

  8. Delay/Disruption Tolerant Networks (DTN): Testing and Demonstration for Lunar Surface Applications

    Science.gov (United States)

    2009-01-01

    This slide presentation reviews the testing of the Delay/Disruption Tolerant Network (DTN) designed for use with Lunar Surface applications. This is being done through the DTN experimental Network (DEN), that permit access and testing by other NASA centers, DTN team members and protocol developers. The objective of this work is to demonstrate DTN for high return applications in lunar scenarios, provide DEN connectivity with analogs of Constellation elements, emulators, and other resources from DTN Team Members, serve as a wireless communications staging ground for remote analog excursions and enable testing of detailed communication scenarios and evaluation of network performance. Three scenarios for DTN on the Lunar surface are reviewed: Motion imagery, Voice and sensor telemetry, and Navigation telemetry.

  9. Design and Testing of a Wireless Demonstrator for Large Instrumentation Systems

    CERN Document Server

    Sahoo, H; Djurcic, Z; Drake, G; Hashemian, R; Kreps, A; Oberling, M; Pearson, T

    2013-01-01

    In this proceeding, we report the development of a wireless demonstrator intended to readout instrumentation systems having thousands of channels. A data acquisition system was designed and tested based on compliant implementation of 802.11n based hardware and protocols. This project is for large detectors containing photomultiplier tubes. Both free-space optical and radio frequency techniques were tested for wireless power transfer. The front-end circuitry, including a high-voltage power supply was powered wirelessly, thus creating an all-wireless detector readout. The system was successfully tested as a single detector module, which was powered wirelessly and transmitted data wirelessly. The performance of the prototype system and how a large scale implementation of the system might be realized are described in this proceeding.

  10. Demonstration test of burner liner strain measurements using resistance strain gages

    Science.gov (United States)

    Grant, H. P.; Anderson, W. L.

    1984-01-01

    A demonstration test of burner liner strain measurements using resistance strain gages as well as a feasibility test of an optical speckle technique for strain measurement are presented. The strain gage results are reported. Ten Kanthal A-1 wire strain gages were used for low cycle fatigue strain measurements to 950 K and .002 apparent strain on a JT12D burner can in a high pressure (10 atmospheres) burner test. The procedure for use of the strain gages involved extensive precalibration and postcalibration to correct for cooling rate dependence, drift, and temperature effects. Results were repeatable within + or - .0002 to .0006 strain, with best results during fast decels from 950 K. The results agreed with analytical prediction based on an axisymmetric burner model, and results indicated a non-uniform circumferential distribution of axial strain, suggesting temperature streaking.

  11. Electrodril system field test program. Phase II, task B: deep drilling system demonstration. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1978-12-15

    The effort included the design, fabrication and Systems Verification Testing of the Deep Drilling System. The Systems Verification Test was conducted during October 1978 in a test well located on the premises of Brown Oil Tools Inc., Houston, Texas. In general, the Systems Verification test program was an unqualified success. All of the system elements of the Deep Drilling System were exercised and evaluated and in every instance the system can be declared ready for operational well demonstration. The motor/bit shaft combination operated very well and seal performance exceeds the design goals. The rig floor system performed better than expected. The power cable flexural characteristics are much better than anticipated and longitudinal stability is excellent. The prototype production connectors have functioned without failure. The cable reels and drive skid have also worked very well during the test program. The redesigned and expanded instrumentation subsystem also functioned very well. Some electronic component malfunctions were experienced during the early test stages, but they were isolated quickly and repaired. Subsequent downhole instrumentation deployments were successfully executed and downhole data was displayed both in the Electrodril instrumentation trailer and on the remote control and display unit.

  12. Analysis of test results of a ground demonstration of a Pluto/Express power generator

    Energy Technology Data Exchange (ETDEWEB)

    Tournier, J.-M.; El-Genk, M.S. [University of New Mexico, Dept. of Chemical and Nuclear Engineering, Albuquerque, NM (United States)

    1999-07-01

    Results of recent tests of a Pluto/Express electric power generator ground demonstration were analysed. The performance parameters of each of the eight ground demonstrations vapour anode, multitube alkali-metal thermal-to-electric conversion (AMTEC) cells, designated PX-3G, were analysed and compared. The ground demonstration cells produced a total peak electric power of 27 W{sub e} at a load voltage of 16 V when tested at hot and cold side temperatures of 1123 K and 553 K, respectively. The electric power output and terminal voltage of the individual cells, however, differed by as much as 25%, from 2.94 to 3.76 W{sub e}, and from 1.73 to 2.21 V, respectively. These variations were attributed to differences among the cells in the values of: (a) the contact resistance of the BASE/electrode and of the electrode/current collector; (b) the leakage current between the anode and cathode electrodes through the metal-ceramic braze joint between the BASE tubes and the metal support plate; and (c) the charge-exchange polarisation losses. Analysis of results suggested the existence of large electrical leakage currents in some of the PX-3G cells. The performance of the PX-3G cells was below that needed for meeting the Pluto/Express mission's electric power requirement. (Author)

  13. Test-beam results from the ATLAS level-1 calorimeter trigger demonstrator

    CERN Document Server

    Bohm, C; Bright-Thomas, P G; Connors, A; Edwards, J; Eisenhandler, Eric F; Ellis, Nick; Engström, M; Farthouat, Philippe; Garvey, J; Gee, C N P; Gillman, A R; Hanke, P; Hatley, R; Hellman, S; Hillier, S J; Kluge, E E; Landon, M; Maddox, A J; Pentney, J M; Perera, V J O; Pfeiffer, U; Schuler, G A; Schumacher, C; Shah, T P; Silverstein, S; Staley, R J; Watkins, P M; Watson, A T; Wunsch, M

    1998-01-01

    The ATLAS level-1 calorimeter trigger will utilise a number of advanced technologies, many of which have already been successfully demonstrated. To evaluate the different technologies associated with the important areas of $9 high-speed data transport a large demonstrator system has been designed and operated during the last two years, using signals from prototype calorimeters in the ATLAS test-beam. Using this system, inter-crate data transmission and $9 reception have been demonstrated at over 1.4 Gbyte/s, with individual links running at up to 1.6 Gbaud. Operating with 160 Mbit/s signals across a transmission-line backplane, custom transceiver ASICs have achieved inter-module data $9 fanout at peak rates above 800 Mbyte/s. With the addition of further modules, the system was extended to emulate a vertical slice through the ATLAS level-1 calorimeter trigger. We present here the results from these tests, including $9 measurements of bit-error rates across different data paths. (12 refs).

  14. Demonstration of full-field patterning of 32 nm test chips using EUVL

    Science.gov (United States)

    Vandentop, Gilroy; Chandhok, Manish; Putna, Ernisse S.; Younkin, Todd R.; Clarke, James S.; Carson, Steven; Myers, Alan; Leeson, Michael; Zhang, Guojing; Liang, Ted; Murachi, Tetsunori

    2009-03-01

    EUV lithography is considered one of the options for high volume manufacturing (HVM) of 16 nm MPU node devices [1]. The benefits of high k1(~0.5) imaging enable EUVL to simplify the patterning process and ease design rule restrictions. However, EUVL with its unique imaging process - reflective optics and masks, vacuum operation, and lack of pellicle, has several challenges to overcome before being qualified for production. Thus, it is important to demonstrate the capability to integrate EUVL into existing process flows and characterize issues which could hamper yield. A patterning demonstration of Intel's 32 nm test chips using the ADT at IMEC [7] is presented, This test chip was manufactured using processes initially developed with the Intel MET [2-4] as well as masks made by Intel's mask shop [5,6]. The 32 nm node test chips which had a pitch of 112.5 nm at the trench layer, were patterned on the ADT which resulted in a large k1 factor of 1 and consequently, the trench process window was iso-focal with MEEF = 1. It was found that all mask defects detected by a mask pattern inspection tool printed on the wafer and that 90% of these originated from the substrate. We concluded that improvements are needed in mask defects, photospeed of the resist, overlay, and tool throughput of the tool to get better results to enable us to ultimately examine yield.

  15. Demonstration and field trial of a resilient hybrid NG-PON test-bed

    Science.gov (United States)

    Prat, Josep; Polo, Victor; Schrenk, Bernhard; Lazaro, Jose A.; Bonada, Francesc; Lopez, Eduardo T.; Omella, Mireia; Saliou, Fabienne; Le, Quang T.; Chanclou, Philippe; Leino, Dmitri; Soila, Risto; Spirou, Spiros; Costa, Liliana; Teixeira, Antonio; Tosi-Beleffi, Giorgio M.; Klonidis, Dimitrios; Tomkos, Ioannis

    2014-10-01

    A multi-layer next generation PON prototype has been built and tested, to show the feasibility of extended hybrid DWDM/TDM-XGPON FTTH networks with resilient optically-integrated ring-trees architecture, supporting broadband multimedia services. It constitutes a transparent common platform for the coexistence of multiple operators sharing the optical infrastructure of the central metro ring, passively combining the access and the metropolitan network sections. It features 32 wavelength connections at 10 Gbps, up to 1000 users distributed in 16 independent resilient sub-PONs over 100 km. This paper summarizes the network operation, demonstration and field trial results.

  16. Wind tunnel testing of the DeepWind demonstrator in design and tilted operating conditions

    DEFF Research Database (Denmark)

    Battistia, L.; Benini, E.; Brighenti, A.

    2016-01-01

    ) configuration. The velocity field in the wake of the rotor was also fully characterized by means of an instrumented traversing system, to investigate the flow distribution downstream of the test section. Special care is taken in the description of the experimental set-up and of the measured data, so......The DeepWind Project aims at investigating the feasibility of a new floating vertical-axis wind turbine (VAWT) concept, whose purpose is to exploit wind resources at deep-water offshore sites. The results of an extensive experimental campaign on the DeepWind reduced scale demonstrator are here...... was installed on a high precision test bench, whose axis was suitable to be inclined up to 15° with respect to the design (i.e. upright) operating condition. The experiments were performed at the large scale, high speed wind tunnel of the Politecnico di Milano (Italy), using a “free jet” (open channel...

  17. Development, testing, and demonstration of an optimal fine coal cleaning circuit

    Energy Technology Data Exchange (ETDEWEB)

    Mishra, M.; Placha, M.; Bethell, P. [and others

    1995-11-01

    The overall objective of this project is to improve the efficiency of fine coal cleaning. The project will be completed in two phases: bench-scale testing and demonstration of four advanced flotation cells and; in-plant proof-of-concept (POC) pilot plant testing of two flotation cells individually and in two-stage combinations. The goal is to ascertain if a two-stage circuit can result in reduced capital and operating costs while achieving improved separation efficiency. The plant selected for this project, Cyprus Emerald Coal Preparation plant, cleans 1200 tph of raw coal. The plant produces approximately 4 million tonnes of clean coal per year at an average as received energy content of 30.2 MJ/Kg (13,000 Btu/lb).

  18. Certification Testing and Demonstration of Insulated Pressure Vessels for Vehicular Hydrogen Storage

    Energy Technology Data Exchange (ETDEWEB)

    Aceves, S M; Martinez-Frias, J; Espinosa-Loza, F

    2002-05-22

    Insulated pressure vessels are cryogenic-capable pressure vessels that can be fueled with liquid hydrogen or ambient-temperature compressed hydrogen. This flexibility results in multiple advantages with respect to compressed hydrogen tanks or low-pressure liquid hydrogen tanks. Our work is directed at verifying that commercially available aluminum-lined, fiber-wrapped pressure vessels can be safely used to store liquid hydrogen. A series of tests have been conducted, and the results indicate that no significant vessel damage has resulted from cryogenic operation. Future activities include a demonstration project in which the insulated pressure vessels will be installed and tested on two vehicles. A draft standard will also be generated for certification of insulated pressure vessels.

  19. Executive Functioning in Normal Aging: A Study of Action Planning Using the Zoo Map Test

    Science.gov (United States)

    Allain, P.; Nicoleau, S.; Pinon, K.; Etcharry-Bouyx, F.; Barre, J.; Berrut, G.; Dubas, F.; Gall, D.L.

    2005-01-01

    A particularly important aspect of executive functioning involves the ability to form and carry out complex plans, that is to say planning. This study aimed to investigate planning in 18 older and 16 younger normal participants using an ecological planning subtask derived from the Behavioural Assessment of the Dysexecutive Syndrome test battery,…

  20. Integrated development and testing plan for the plutonium immobilization project

    Energy Technology Data Exchange (ETDEWEB)

    Kan, T.

    1998-07-01

    This integrated plan for the DOE Office of Fissile Materials Disposition (MD) describes the technology development and major project activities necessary to support the deployment of the immobilization approach for disposition of surplus weapons-usable plutonium. The plan describes details of the development and testing (D&T) tasks needed to provide technical data for design and operation of a plutonium immobilization plant based on the ceramic can-in-canister technology (''Immobilization Fissile Material Disposition Program Final Immobilization Form Assessment and Recommendation'', UCRL-ID-128705, October 3, 1997). The plan also presents tasks for characterization and performance testing of the immobilization form to support a repository licensing application and to develop the basis for repository acceptance of the plutonium form. Essential elements of the plant project (design, construction, facility activation, etc.) are described, but not developed in detail, to indicate how the D&T results tie into the overall plant project. Given the importance of repository acceptance, specific activities to be conducted by the Office of Civilian Radioactive Waste Management (RW) to incorporate the plutonium form in the repository licensing application are provided in this document, together with a summary of how immobilization D&T activities provide input to the license activity. The ultimate goal of the Immobilization Project is to develop, construct, and operate facilities that will immobilize from about 18 to 50 tonnes (MT) of U.S. surplus weapons usable plutonium materials in a manner that meets the ''spent fuel'' standard (Fissile Materials Storage and Disposition Programmatic Environmental Impact Statement Record of Decision, ''Storage and Disposition Final PEIS'', issued January 14, 1997, 62 Federal Register 3014) and is acceptable for disposal in a geologic repository. In the can-in-canister technology

  1. Active vibration control testing of the SPICES program: final demonstration article

    Science.gov (United States)

    Dunne, James P.; Jacobs, Jack H.

    1996-05-01

    The Synthesis and Processing of Intelligent Cost Effective Structures (SPICES) Program is a partnership program sponsored by the Advanced Research Projects Agency. The mission of the program is to develop cost effective material processing and synthesis technologies to enable new products employing active vibration suppression and control devices to be brought to market. The two year program came to fruition in 1995 through the fabrication of the final smart components and testing of an active plate combined with two trapezoidal rails, forming an active mount. Testing of the SPICES combined active mount took place at McDonnell Douglas facilities in St. Louis, MO, in October-December 1995. Approximately 15 dB reduction in overall response of a motor mounted on the active structure was achieved. Further details and results of the SPICES combined active mount demonstration testing are outlined. Results of numerous damping and control strategies that were developed and employed in the testing are presented, as well as aspects of the design and fabrication of the SPICES active mount components.

  2. Optimal Constant-Stress Accelerated Degradation Test Plans Using Nonlinear Generalized Wiener Process

    Directory of Open Access Journals (Sweden)

    Zhen Chen

    2016-01-01

    Full Text Available Accelerated degradation test (ADT has been widely used to assess highly reliable products’ lifetime. To conduct an ADT, an appropriate degradation model and test plan should be determined in advance. Although many historical studies have proposed quite a few models, there is still room for improvement. Hence we propose a Nonlinear Generalized Wiener Process (NGWP model with consideration of the effects of stress level, product-to-product variability, and measurement errors for a higher estimation accuracy and a wider range of use. Then under the constraints of sample size, test duration, and test cost, the plans of constant-stress ADT (CSADT with multiple stress levels based on the NGWP are designed by minimizing the asymptotic variance of the reliability estimation of the products under normal operation conditions. An optimization algorithm is developed to determine the optimal stress levels, the number of units allocated to each level, inspection frequency, and measurement times simultaneously. In addition, a comparison based on degradation data of LEDs is made to show better goodness-of-fit of the NGWP than that of other models. Finally, optimal two-level and three-level CSADT plans under various constraints and a detailed sensitivity analysis are demonstrated through examples in this paper.

  3. Replacement of the in vivo neutralisation test for efficacy demonstration of tetanus vaccines ad us. vet.

    Science.gov (United States)

    Rosskopf, Ute; Noeske, Kerstin; Werner, Esther

    2005-01-01

    The bacterium Clostridium (C.) tetani is an ubiquitous pathogen. This anaerobic, gram-positive bacterium can form spores and can be found in the whole environment. It enters the body via injuries of the skin and wounds where it releases the neurotoxin "tetanospasmin" (= tetanus toxin). The animals most susceptible to tetanus infection are horses and sheep. Only active immunisation by tetanus vaccine provides effective protection against tetanus intoxication. The marketing authorisation requirements stipulate that efficacy of tetanus vaccines ad us. vet. must be demonstrated in all target animal species via determination of neutralising tetanus serum antitoxin concentrations. The standard method used for this purpose is still the toxin neutralisation test (TNT), as it quantifies the tetanus toxin-neutralising effect of tetanus serum antibodies in vivo. In this test, tetanus toxin is added to dilutions of serum from vaccinated horse and sheep. The serum dilutions are then administered to mice or guinea pigs, which are observed for toxic symptoms. Against the background of animal protection, the goal of one project of the Paul-Ehrlich-Institut (Bundesministerium fuer Bildung und Forschung (Federal Ministry for Education and Research), 0312636) was to establish an alternative to the toxin neutralisation test, enabling the testing of efficacy of tetanus vaccines with serological in vitro methods. For this purpose, a so-called double antigen ELISA (DAE) was established which enables the testing of sera of different species in one assay. In addition, the sera were tested in an indirect ELISA for horses and sheep separately. Altogether, ten groups of horses and eight groups of sheep were immunised with ten animals per group each. The tetanus vaccines comprised almost all products authorised for the German market at the start of the project. 564 horse sera and 257 sheep sera were tested using the two ELISA methods. Some sera were also tested in vivo. The kinetics of

  4. OECD 2-D Core Concrete Interaction (CCI) tests : CCI-2 test plan, Rev. 0 January 31, 2004.

    Energy Technology Data Exchange (ETDEWEB)

    Farmer, M. T.; Kilsdonk, D. J.; Lomperski, S.; Aeschlimann, R. W.; Basu, S. (Nuclear Engineering Division)

    2011-05-23

    The Melt Attack and Coolability Experiments (MACE) program addressed the issue of the ability of water to cool and thermally stabilize a molten core-concrete interaction when the reactants are flooded from above. These tests provided data regarding the nature of corium interactions with concrete, the heat transfer rates from the melt to the overlying water pool, and the role of noncondensable gases in the mixing processes that contribute to melt quenching. As a follow-on program to MACE, The Melt Coolability and Concrete Interaction Experiments (MCCI) project is conducting reactor material experiments and associated analysis to achieve the following objectives: (1) resolve the ex-vessel debris coolability issue through a program that focuses on providing both confirmatory evidence and test data for the coolability mechanisms identified in MACE integral effects tests, and (2) address remaining uncertainties related to long-term two-dimensional molten core-concrete interactions under both wet and dry cavity conditions. Achievement of these two program objectives will demonstrate the efficacy of severe accident management guidelines for existing plants, and provide the technical basis for better containment designs for future plants. In terms of satisfying these objectives, the Management Board (MB) approved the conduct of two long-term 2-D Core-Concrete Interaction (CCI) experiments designed to provide information in several areas, including: (i) lateral vs. axial power split during dry core-concrete interaction, (ii) integral debris coolability data following late phase flooding, and (iii) data regarding the nature and extent of the cooling transient following breach of the crust formed at the melt-water interface. The first of these two tests, CCI-1, was conducted on December 19, 2003. This test investigated the interaction of a fully oxidized 400 kg PWR core melt, initially containing 8 wt % calcined siliceous concrete, with a specially designed two

  5. 29 CFR 4231.6 - Plan solvency tests.

    Science.gov (United States)

    2010-07-01

    .... The actuary may select as the amortization period either— (i) The first 25 plan years beginning on or... determined under the funding method and assumptions expected to be used by the plan actuary for purposes...

  6. Test Plan for Radioactive Testing of a Vertical Direct Denitration Calciner

    Energy Technology Data Exchange (ETDEWEB)

    COMPTON, J.A.

    1999-10-05

    A vertical calciner will be used to demonstrate the direct denitration process for converting plutonium-bearing liquors to stable plutonium rich solids. The calciner and some of its associated equipment were previously tested with non-radioactive chemicals to demonstrate operability.

  7. Testing of an Annular Linear Induction Pump for the Fission Surface Power Technology Demonstration Unit

    Science.gov (United States)

    Polzin, K. A.; Pearson, J. B.; Webster, K.; Godfoy, T. J.; Bossard, J. A.

    2013-01-01

    Results of performance testing of an annular linear induction pump that has been designed for integration into a fission surface power technology demonstration unit are presented. The pump electromagnetically pushes liquid metal (NaK) through a specially-designed apparatus that permits quantification of pump performance over a range of operating conditions. Testing was conducted for frequencies of 40, 55, and 70 Hz, liquid metal temperatures of 125, 325, and 525 C, and input voltages from 30 to 120 V. Pump performance spanned a range of flow rates from roughly 0.3 to 3.1 L/s (4.8 to 49 gpm), and pressure heads of <1 to 104 kPa (<0.15 to 15 psi). The maximum efficiency measured during testing was 5.4%. At the technology demonstration unit operating temperature of 525 C the pump operated over a narrower envelope, with flow rates from 0.3 to 2.75 L/s (4.8 to 43.6 gpm), developed pressure heads from <1 to 55 kPa (<0.15 to 8 psi), and a maximum efficiency of 3.5%. The pump was supplied with three-phase power at 40 and 55 Hz using a variable-frequency motor drive, while power at 55 and 70 Hz was supplied using a variable-frequency power supply. Measured performance of the pump at 55 Hz using either supply exhibited good quantitative agreement. For a given temperature, the peak in efficiency occurred at different flow rates as the frequency was changed, but the maximum value of efficiency was relative insensitive within 0.3% over the frequency range tested, including a scan from 45 to 78 Hz. The objectives of the FSP technology project are as follows:5 • Develop FSP concepts that meet expected surface power requirements at reasonable cost with added benefits over other options. • Establish a nonnuclear hardware-based technical foundation for FSP design concepts to reduce overall development risk. • Reduce the cost uncertainties for FSP and establish greater credibility for flight system cost estimates. • Generate the key nonnuclear products to allow Agency

  8. 33 CFR 164.80 - Tests, inspections, and voyage planning.

    Science.gov (United States)

    2010-07-01

    ... planning. 164.80 Section 164.80 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND..., and voyage planning. (a) The owner, master, or operator of each towing vessel of less than 1,600 GT... applicable; of chafing gear; and of the winch brake, if installed. (c)(1) The voyage-planning requirements...

  9. Participatory planning in river catchments, an innovative toolkit tested in Southern Africa and North West England.

    Science.gov (United States)

    Tippett, J

    2005-01-01

    The European Union Water Framework Directive (WFD) offers an unparalleled opportunity for improving river basin management. Active participation is essential for its delivery. "End-of-pipe" solutions will not deliver the improvements needed to achieve its ambitious goals. This research tested DesignWays, a toolkit for participatory planning, as a mechanism for maximizing the long-term social and environmental benefits of such stakeholder and community participation. It examined the emerging role of "planning for sustainability" in the context of river catchments. Sustainable management of water requires integration, and recognition of interconnections between systems at different levels of scale. This is an endeavour in which systems thinking provides useful tools. The development of DesignWays was a conscious attempt to embed 'new paradigm' living systems metaphors into a practical planning tool. This paper begins with a description of DesignWays and its development in Southern Africa. An outline of the context of the action research in North-West England is followed by a description of the stages of the process, with highlights of the outcomes. This research had two major outcomes: a contribution to theory through an in-depth exploration of the theoretical basis of participatory, ecologically informed design; and a contribution to practice through investigating DesignWays' potential to meet key challenges of the WFD. This research points to the importance of understanding participatory planning as a societal process, aiming to make the process engaging and meaningful. It has pointed to the need to see participatory planning and education for sustainability as an integrated process. It demonstrated the benefits of an iterative process in which planning at the landscape level of scale informs, and is informed by, work at the site level. It has shown that an approach consistent with a living systems paradigm can contribute to the development of more integrated

  10. Closeout final report on a demonstration test and evaluation of the Cannon Low-NOx Digester System

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Cannon Boiler Works Inc. has been investigating a system for removing NOx from the exhaust gases of furnaces, gas turbines, chemical reactors, incinerators, and boilers. Computer simulations, bench-scale and pilot plant tests have proved that the system is capable of removing substantially all of the NOx from natural gas fired equipment exhaust streams. Originally designated as the Cannon NOx Digester, it has recently been renamed the Low Temperature Oxidation (LTO) System for NOx and SOx Reduction. The principal elements in the system are a fan, heat exchanger, oxidation chamber, spray chamber acting as a gas/liquid absorber, demister, an ozone generator, liquid oxygen storage or dry air supply system for the ozonator, chemical storage and metering system for the caustic neutralizer, and a data acquisition and control system. Most of the ozone is consumed in converting NOx to N{sub 2}O{sub 5} which hydrates to nitric acid which is then scrubbed out of the gas as it passes through the absorber. CO also reacts with ozone to form CO{sub 2} which is subsequently scrubbed out with NaOH. A demonstration, planned for the Alta Dena Dairy located near Los Angeles and in violation of California`s air quality regulations for natural gas fired boilers, was started, delayed due to boiler modifications, and will be continued shortly with new funding. This paper describes the LTO process and presents results from the initial demonstration.

  11. Startup, testing, and operation of the Santa Clara 2MW direct carbonate fuel cell demonstration plant

    Energy Technology Data Exchange (ETDEWEB)

    Skok, A.J.; Leo, A.J. [Fuel Cell Engineering Corp., Danbury, CT (United States); O`Shea, T.P. [Santa Clara Demonstration Project, CA (United States)

    1996-12-31

    The Santa Clara Demonstration Project (SCDP) is a collaboration between several utility organizations, Fuel Cell Engineering Corporation (FCE), and the U.S. Dept. Of Energy aimed at the demonstration of Energy Research Corporation`s (ERC) direct carbonate fuel cell (DFC) technology. ERC has been pursuing the development of the DFC for commercialization near the end of this decade, and this project is an integral part of the ERC commercialization effort. The objective of the Santa Clara Demonstration Project is to provide the first full, commercial scale demonstration of this technology. The approach ERC has taken in the commercialization of the DFC is described in detail elsewhere. An aggressive core technology development program is in place which is focused by ongoing interaction with customers and vendors to optimize the design of the commercial power plant. ERC has selected a 2.85 MW power plant unit for initial market entry. Two ERC subsidiaries are supporting the commercialization effort: the Fuel Cell Manufacturing Corporation (FCMC) and the Fuel Cell Engineering Corporation (FCE). FCMC manufactures carbonate stacks and multi-stack modules, currently from its production facility in Torrington, CT. FCE is responsible for power plant design, integration of all subsystems, sales/marketing, and client services. FCE is serving as the prime contractor for the design, construction, and testing of the SCDP Plant. FCMC has manufactured the multi-stack submodules used in the DC power section of the plant. Fluor Daniel Inc. (FDI) served as the architect-engineer subcontractor for the design and construction of the plant and provided support to the design of the multi-stack submodules. FDI is also assisting the ERC companies in commercial power plant design.

  12. DOUBLE TRACKS Test Site interim corrective action plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The DOUBLE TRACKS site is located on Range 71 north of the Nellis Air Force Range, northwest of the Nevada Test Site (NTS). DOUBLE TRACKS was the first of four experiments that constituted Operation ROLLER COASTER. On May 15, 1963, weapons-grade plutonium and depleted uranium were dispersed using 54 kilograms of trinitrotoluene (TNT) explosive. The explosion occurred in the open, 0.3 m above the steel plate. No fission yield was detected from the test, and the total amount of plutonium deposited on the ground surface was estimated to be between 980 and 1,600 grams. The test device was composed primarily of uranium-238 and plutonium-239. The mass ratio of uranium to plutonium was 4.35. The objective of the corrective action is to reduce the potential risk to human health and the environment and to demonstrate technically viable and cost-effective excavation, transportation, and disposal. To achieve these objectives, Bechtel Nevada (BN) will remove soil with a total transuranic activity greater then 200 pCI/g, containerize the soil in ``supersacks,`` transport the filled ``supersacks`` to the NTS, and dispose of them in the Area 3 Radioactive Waste Management Site. During this interim corrective action, BN will also conduct a limited demonstration of an alternative method for excavation of radioactive near-surface soil contamination.

  13. Design techniques for developing a computerized instrumentation test plan. [for wind tunnel test data acquisition system

    Science.gov (United States)

    Burnett, S. Kay; Forsyth, Theodore J.; Maynard, Everett E.

    1987-01-01

    The development of a computerized instrumentation test plan (ITP) for the NASA/Ames Research Center National Full Scale Aerodynamics Complex (NFAC) is discussed. The objective of the ITP program was to aid the instrumentation engineer in documenting the configuration and calibration of data acquisition systems for a given test at any of four low speed wind tunnel facilities (Outdoor Aerodynamic Research Facility, 7 x 10, 40 x 80, and 80 x 120) at the NFAC. It is noted that automation of the ITP has decreased errors, engineering hours, and setup time while adding a higher level of consistency and traceability.

  14. A Multi-Year Plan for Research, Development, and Prototype Testing of Standard Modular Hydropower Technology

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Brennan T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Welch, Tim [U.S. Department of Energy (DOE), Washington, DC (United States).Office of Energy Efficiency and Renewable Energy (EERE); Witt, Adam M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Stewart, Kevin M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Lee, Kyutae [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); DeNeale, Scott T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bevelhimer, Mark S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Burress, Timothy A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Pracheil, Brenda M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Pries, Jason L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); O' Connor, Patrick W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Curd, Shelaine L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ekici, Kivanc [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States); Papanicolaou, Thanos [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States); Tsakiris, Achilleas [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States); Kutz, Benjamin [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Univ. of Tennessee, Knoxville, TN (United States); Bishop, Norm [Knight Piesold, Denver, CO (United States); McKeown, Alisha [McKeown and Associates, Moberly, MO (United States); Rabon, Daniel [U.S. Department of Energy (DOE), Washington, DC (United States).Office of Energy Efficiency and Renewable Energy (EERE); Zimmerman, Gregory P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Uria Martinez, Rocio [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); McManamay, Ryan A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-02-01

    The Multi-Year Plan for Research, Development, and Prototype Testing of Standard Modular Hydropower Technology (MYRP) presents a strategy for specifying, designing, testing, and demonstrating the efficacy of standard modular hydropower (SMH) as an environmentally compatible and cost-optimized renewable electricity generation technology. The MYRP provides the context, background, and vision for testing the SMH hypothesis: if standardization, modularity, and preservation of stream functionality become essential and fully realized features of hydropower technology, project design, and regulatory processes, they will enable previously unrealized levels of new project development with increased acceptance, reduced costs, increased predictability of outcomes, and increased value to stakeholders. To achieve success in this effort, the MYRP outlines a framework of stakeholder-validated criteria, models, design tools, testing facilities, and assessment protocols that will facilitate the development of next-generation hydropower technologies.

  15. Project W-314 specific test and evaluation plan for 241-AY-01A pump pit upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hays, W.H.

    1998-05-19

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-0IA Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-01A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP).

  16. Project W-314 specific test and evaluation plan for 241-AY-02A pump pit upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hays, W.H.

    1998-05-19

    This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-02A Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-02A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP).

  17. General Mission Analysis Tool (GMAT) Acceptance Test Plan [Draft

    Science.gov (United States)

    Dove, Edwin; Hughes, Steve

    2007-01-01

    The information presented in this Acceptance Test Plan document shows the current status of the General Mission Analysis Tool (GMAT). GMAT is a software system developed by NASA Goddard Space Flight Center (GSFC) in collaboration with the private sector. The GMAT development team continuously performs acceptance tests in order to verify that the software continues to operate properly after updates are made. The GMAT Development team consists of NASA/GSFC Code 583 software developers, NASA/GSFC Code 595 analysts, and contractors of varying professions. GMAT was developed to provide a development approach that maintains involvement from the private sector and academia, encourages collaborative funding from multiple government agencies and the private sector, and promotes the transfer of technology from government funded research to the private sector. GMAT contains many capabilities, such as integrated formation flying modeling and MATLAB compatibility. The propagation capabilities in GMAT allow for fully coupled dynamics modeling of multiple spacecraft, in any flight regime. Other capabilities in GMAT inclucle: user definable coordinate systems, 3-D graphics in any coordinate system GMAT can calculate, 2-D plots, branch commands, solvers, optimizers, GMAT functions, planetary ephemeris sources including DE405, DE200, SLP and analytic models, script events, impulsive and finite maneuver models, and many more. GMAT runs on Windows, Mac, and Linux platforms. Both the Graphical User Interface (GUI) and the GMAT engine were built and tested on all of the mentioned platforms. GMAT was designed for intuitive use from both the GUI and with an importable script language similar to that of MATLAB.

  18. Test plan using the HTTR for commercialization of GTHTR300C

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-10-15

    The high temperature engineering test reactor (HTTR) is the first high temperature gas-cooled reactor (HTGR) built at the Oarai Research and Development Center of Japan Atomic Energy Agency with thermal power of 30 MW and the maximum reactor outlet coolant temperature of 950 C. The HTTR achieved the first criticality in 1998, the reactor outlet coolant temperature of 950 C in 2004, and 30 days continuous operation in 2007 and 50 days continuous operation in 2010. Since 2002, safety demonstration tests including reactivity insertion tests and coolant flow reduction tests have been conducted to show inherent safety features of HTGR s. This report describes the future test plan by using the HTTR. The test items cover reactor thermal hydraulics and plant dynamics such as loss of forced cooling tests, loss of heat load tests, rapid increase of forced cooling tests and measurement of core flow and temperature distribution, etc. The test results will be utilized for realization of Japan's commercial very high temperature reactor (VHTR) system, GTHTR300C and the Gen IV HTGR activities. (Author)

  19. Cold test plan for the Old Hydrofracture Facility tank contents removal project, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    This Old Hydrofracture Facility (OHF) Tanks Contents Removal Project Cold Test Plan describes the activities to be conducted during the cold test of the OHF sluicing and pumping system at the Tank Technology Cold Test Facility (TTCTF). The TTCTF is located at the Robotics and Process Systems Complex at the Oak Ridge National Laboratory (ORNL). The cold test will demonstrate performance of the pumping and sluicing system, fine-tune operating instructions, and train the personnel in the actual work to be performed. After completion of the cold test a Technical Memorandum will be prepared documenting completion of the cold test, and the equipment will be relocated to the OHF site.

  20. Irradiated test fuel shipment plan for the LWR MOX fuel irradiation test project

    Energy Technology Data Exchange (ETDEWEB)

    Shappert, L.B.; Dickerson, L.S.; Ludwig, S.B.

    1998-10-16

    This document outlines the responsibilities of DOE, DOE contractors, the commercial carrier, and other organizations participating in a shipping campaign of irradiated test specimen capsules containing mixed-oxide (MOX) fuel from the Idaho National Engineering and Environmental Laboratory (INEEL) to the Oak Ridge National Laboratory (ORNL). The shipments described here will be conducted according to applicable regulations of the US Department of Transportation (DOT), US Nuclear Regulatory Commission (NRC), and all applicable DOE Orders. This Irradiated Test Fuel Shipment Plan for the LWR MOX Fuel Irradiation Test Project addresses the shipments of a small number of irradiated test specimen capsules and has been reviewed and agreed to by INEEL and ORNL (as participants in the shipment campaign). Minor refinements to data entries in this plan, such as actual shipment dates, exact quantities and characteristics of materials to be shipped, and final approved shipment routing, will be communicated between the shipper, receiver, and carrier, as needed, using faxes, e-mail, official shipping papers, or other backup documents (e.g., shipment safety evaluations). Any major changes in responsibilities or data beyond refinements of dates and quantities of material will be prepared as additional revisions to this document and will undergo a full review and approval cycle.

  1. Orally administered whole egg demonstrates antidepressant-like effects in the forced swimming test on rats.

    Science.gov (United States)

    Nagasawa, Mao; Otsuka, Tsuyoshi; Ogino, Yumi; Yoshida, Junki; Tomonaga, Shozo; Yasuo, Shinobu; Furuse, Mitsuhiro

    2014-08-01

    Several studies have reported that vegetarian diets are associated with a higher prevalence of major depression. Therefore, we hypothesised that the consumption of animal products, especially eggs, may have positive effects on mental health, especially on major depression, because a previous study reported that egg consumption produces numerous beneficial effects in humans. The purpose of the present study was to evaluate the effects of chronic whole-egg treatment on depression-like behaviours in Wistar rats, a control strain, and Wistar Kyoto rats, an animal model of depression. In both the rats, either whole-egg solution (5 ml/kg) or distilled water (5 ml/kg) was orally administrated for 35 days. During these periods, the open-field test (OFT) was conducted on the 21st day, and a forced swimming test (FST) was enforced on the 27th and 28th days. On the 36th day, the plasma and brain were collected. Chronic whole-egg treatment did not affect line crossing in the OFT, whereas it reduced the total duration of immobility in the FST on both strains. Furthermore, interestingly, the results indicated the possibility that whole-egg treatment elevated the incorporation of tryptophan into the brain, and the tryptophan concentration in the prefrontal cortex was actually increased by the treatment. This study demonstrated that whole-egg treatment exerts an antidepressant-like effect in the FST. It is suggested that whole egg may be an excellent food for preventing and alleviating the conditions of major depression.

  2. Certification Testing and Demonstration of Insulated Pressure Vessels for Vehicular Hydrogen and Natural Gas Storage

    Energy Technology Data Exchange (ETDEWEB)

    Aceves, S M; Martinez-Frias, J; Espinosa-Loza, F; Schaffer, R; Clapper, W

    2002-05-22

    We are working on developing an alternative technology for storage of hydrogen or natural gas on light-duty vehicles. This technology has been titled insulated pressure vessels. Insulated pressure vessels are cryogenic-capable pressure vessels that can accept either liquid fuel or ambient-temperature compressed fuel. Insulated pressure vessels offer the advantages of cryogenic liquid fuel tanks (low weight and volume), with reduced disadvantages (fuel flexibility, lower energy requirement for fuel liquefaction and reduced evaporative losses). The work described in this paper is directed at verifying that commercially available pressure vessels can be safely used to store liquid hydrogen or LNG. The use of commercially available pressure vessels significantly reduces the cost and complexity of the insulated pressure vessel development effort. This paper describes a series of tests that have been done with aluminum-lined, fiber-wrapped vessels to evaluate the damage caused by low temperature operation. All analysis and experiments to date indicate that no significant damage has resulted. Future activities include a demonstration project in which the insulated pressure vessels will be installed and tested on two vehicles. A draft standard will also be generated for obtaining insulated pressure vessel certification.

  3. Facility effluent monitoring plan for the fast flux test facility

    Energy Technology Data Exchange (ETDEWEB)

    Nickels, J M; Dahl, N R

    1992-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in US Department of Energy Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could affect employee or public safety or the environment. A Facility Effluent Monitoring Plan determination was performed during calendar year 1991 and the evaluation requires the need for a facility effluent monitoring plan. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements.

  4. BERLinPro Booster Cavity Design, Fabrication and Test Plans

    Energy Technology Data Exchange (ETDEWEB)

    Burrill, Andrew [HZB; Anders, W [HZB; Frahm, A. [HZB; Knobloch, Jens [HZB; Neumann, Axel [HZB; Ciovati, Gianluigi [JLAB; Kneisel, Peter K. [JLAB; Turlington, Larry D. [JLAB

    2014-12-01

    The bERLinPro project, a 100 mA, 50 MeV superconducting RF (SRF) Energy Recovery Linac (ERL) is under construction at Helmholtz-Zentrum Berlin for the purpose of studying the technical challenges and physics of operating a high current, c.w., 1.3 GHz ERL. This machine will utilize three unique SRF cryomodules for the injector, booster and linac module respectively. The booster cryomodule will contain three 2-cell SRF cavities, based on the original design by Cornell University, and will be equipped with twin 115 kW RF power couplers in order to provide the appropriate acceleration to the high current electron beam. This paper will review the status of the fabrication of the 4 booster cavities that have been built for this project by Jefferson Laboratory and look at the challenges presented by the incorporation of fundamental power couplers capable of delivering 115 kW. The test plan for the cavities and couplers will be given along with a brief overview of the cryomodule design.

  5. High consistency forming process for paper making. Part 1. A research, development, and demonstration program plan for the US Papermaking Industry. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-04-01

    The subject of research, development, and demonstration (RD and D) of energy conserving technologies applicable to papermaking operations downstream of the pulping process is addressed. An RD and D Program Plan is presented based on a survey of leading representatives of the papermaking industry, equipment manufacturers, consulting engineering firms, the American Paper Institute, and the Technical Association of the Pulp and Paper Industry. For perspective, the program plan is presented against the general background of the industry's current issues and concerns. The second part of the paper, Phase I, final report, deals with papermaking test facilities. The case for a centralized test facility is discussed. The results of a survey of existing pilot paper machines are presented. The energy saving potential of high consistency forming is considered and related to existing evidence. Simple theoretical models for the press nip action and the drying process are developed to predict where high consistency forming will reduce energy consumption. A special dynamic former has been designed, fabricated, and commissioned to allow development of a laboratory high consistency headbox. The design and construction of a low speed headbox has been completed and the complete system operated. Special equipment and techniques for the measurement of the water and air permeability of sheet samples have been developed and are described.

  6. Milestone Report - M4FT-14OR0312022 - Co-absorption studies - Design system complete/test plan complete

    Energy Technology Data Exchange (ETDEWEB)

    Bruffey, Stephanie H. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Spencer, Barry B. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Jubin, Robert Thomas [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2013-12-01

    The objective of this test plan is to describe research that will determine the effectiveness of silver mordenite and molecular sieve beds to remove iodine and water (tritium) from off-gas streams arising from used nuclear fuel recycling processes, and to demonstrate that the iodine and water can be recovered separately from one another.

  7. Increasing Resiliency to Natural Hazards--A Strategic Plan for the Multi-Hazards Demonstration Project in Southern California

    Science.gov (United States)

    Jones, Lucy; Bernknopf, Richard; Cannon, Susan; Cox, Dale A.; Gaydos, Len; Keeley, Jon; Kohler, Monica; Lee, Homa; Ponti, Daniel; Ross, Stephanie; Schwarzbach, Steven; Shulters, Michael; Ward, A. Wesley; Wein, Anne

    2007-01-01

    Executive Summary The U.S. Geological Survey (USGS) is initiating a new project designed to improve resiliency to natural hazards in southern California through the application of science to community decision making and emergency response. The Multi-Hazards Demonstration Project will assist the region's communities to reduce their risk from natural hazards by directing new and existing research towards the community's needs, improving monitoring technology, producing innovative products, and improving dissemination of the results. The natural hazards to be investigated in this project include coastal erosion, earthquakes, floods, landslides, tsunamis, and wildfires. Americans are more at risk from natural hazards now than at any other time in our Nation's history. Southern California, in particular, has one of the Nation's highest potentials for extreme catastrophic losses due to natural hazards, with estimates of expected losses exceeding $3 billion per year. These losses can only be reduced through the decisions of the southern California community itself. To be effective, these decisions must be guided by the best information about hazards, risk, and the cost-effectiveness of mitigation technologies. The USGS will work with collaborators to set the direction of the research and to create multi-hazard risk frameworks where communities can apply the results of scientific research to their decision-making processes. Partners include state, county, city, and public-lands government agencies, public and private utilities, companies with a significant impact and presence in southern California, academic researchers, the Federal Emergency Management Agency (FEMA), National Oceanic and Atmospheric Administration (NOAA), and local emergency response agencies. Prior to the writing of this strategic plan document, three strategic planning workshops were held in February and March 2006 at the USGS office in Pasadena to explore potential relationships. The goal of these

  8. The Northwest Geysers EGS Demonstration Project Phase 1: Pre-stimulation coupled geomechanical modeling to guide stimulation and monitoring plans

    Energy Technology Data Exchange (ETDEWEB)

    Rutqvist, J.; Dobson, P.F.; Oldenburg, C.M.; Garcia, J.; Walters, M.

    2010-10-20

    This paper presents activities and results associated with Phase 1 (pre-stimulation phase) of an Enhanced Geothermal System (EGS) demonstration project at the northwest part of The Geysers geothermal field, California. The paper presents development of a 3-D geological model, coupled thermal-hydraulic-mechanical (THM) modeling of proposed stimulation injection as well as current plans for stimulation and monitoring of the site. The project aims at creating an EGS by directly and systematically injecting cool water at relatively low pressure into a known High Temperature (about 280 to 350 C) Zone (HTZ) located under the conventional (240 C) steam reservoir at depths of {approx}3 km. Accurate micro-earthquake monitoring initiated before the start of the injection will be used as a tool for tracking the development of the EGS and monitoring changes in microseismicity. We first analyzed historic injection and micro-earthquake data from an injection well (Aidlin 11) located about 3 miles to the west of the new EGS demonstration area. Thereafter, we used the same modeling approach to predict the likely extent of the zone of enhanced permeability for a proposed initial injection in two wells (Prati State 31 and Prati 32) at the new EGS demonstration area. Our modeling indicates that the proposed injection scheme will provide additional steam production in the area by creating a zone of permeability enhancement extending about 0.5 km from each injection well which will connect to the overlying conventional steam reservoir, in agreement with the conclusions of Nielson and Moore (2000).

  9. Test and demonstration of a high performance slot furnace. Progress report, December 1, 1976--June 1, 1977

    Energy Technology Data Exchange (ETDEWEB)

    Bjerklie, J.W.; Most, I.G.

    1977-06-01

    Hague International has embarked upon a two phase program that will verify and demonstrate several methods of energy conservation in the forge industry. A slot furnace was built and installed at Hague International, which incorporates these methods. Tests will be performed on this furnace to demonstrate the effects of the various energy saving devices separately and in combination. This overall project is divided into two phases: test facility preparation and performance tests; and furnace demonstration. Progress through June 1, 1977 on Phase 1 of the overall project is reported. Included is a discussion of the test facility design, instrumentation schedule, furnace modification, burner design, and test program.

  10. Assessment of Startup Fuel Options for a Test or Demonstration Fast Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Carmack, Jon [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hayes, Steven [Idaho National Lab. (INL), Idaho Falls, ID (United States); Walters, L. C. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    This document explores startup fuel options for a proposed test/demonstration fast reactor. The fuel options considered are the metallic fuels U-Zr and U-Pu-Zr and the ceramic fuels UO2 and UO2-PuO2 (MOX). Attributes of the candidate fuel choices considered were feedstock availability, fabrication feasibility, rough order of magnitude cost and schedule, and the existing irradiation performance database. The reactor-grade plutonium bearing fuels (U-Pu-Zr and MOX) were eliminated from consideration as the initial startup fuels because the availability and isotopics of domestic plutonium feedstock is uncertain. There are international sources of reactor grade plutonium feedstock but isotopics and availability are also uncertain. Weapons grade plutonium is the only possible source of Pu feedstock in sufficient quantities needed to fuel a startup core. Currently, the available U.S. source of (excess) weapons-grade plutonium is designated for irradiation in commercial light water reactors (LWR) to a level that would preclude diversion. Weapons-grade plutonium also contains a significant concentration of gallium. Gallium presents a potential issue for both the fabrication of MOX fuel as well as possible performance issues for metallic fuel. Also, the construction of a fuel fabrication line for plutonium fuels, with or without a line to remove gallium, is expected to be considerably more expensive than for uranium fuels. In the case of U-Pu-Zr, a relatively small number of fuel pins have been irradiated to high burnup, and in no case has a full assembly been irradiated to high burnup without disassembly and re-constitution. For MOX fuel, the irradiation database from the Fast Flux Test Facility (FFTF) is extensive. If a significant source of either weapons-grade or reactor-grade Pu became available (i.e., from an international source), a startup core based on Pu could be reconsidered.

  11. FY 1994 program summary: Office of Technology Development, Office of Research and Development, Office of Demonstration, Testing, and Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    The US Department of Energy (DOE) Office of Environmental Management, formerly the Office of Environmental Restoration and Waste Management (EM), was established in November 1989 as the first step toward correcting contamination problems resulting from nearly 50 years of nuclear weapons production and fuel processing activities. EM consolidates several DOE organizations previously responsible for the handling, treatment, and disposition of radioactive and hazardous waste. Within EM, the Office of Technology Development (OTD/EM-50) is responsible for developing technologies to meet DOE`s goal for environmental restoration. OTD manages an aggressive national program of applied research, development, demonstration, testing, and evaluation (RDDT and E) for environmental cleanup, waste management, and related technologies. The program is designed to resolve major technical issues, to rapidly advanced beyond current technologies for environmental restoration and waste management operations, and to expedite compliance with applicable environmental laws and regulations. This report summarizes Fiscal Year 1994 (FY94) programmatic information, accomplishments, and planned activities relevant to the individual activities within OTD`s RDDT and E.

  12. DARPA/USAF/USN J-UCAS X-45A System Demonstration Program: A Review of Flight Test Site Processes and Personnel

    Science.gov (United States)

    Cosentino, Gary B.

    2008-01-01

    The Joint Unmanned Combat Air Systems (J-UCAS) program is a collaborative effort between the Defense Advanced Research Project Agency (DARPA), the US Air Force (USAF) and the US Navy (USN). Together they have reviewed X-45A flight test site processes and personnel as part of a system demonstration program for the UCAV-ATD Flight Test Program. The goal was to provide a disciplined controlled process for system integration and testing and demonstration flight tests. NASA's Dryden Flight Research Center (DFRC) acted as the project manager during this effort and was tasked with the responsibilities of range and ground safety, the provision of flight test support and infrastructure and the monitoring of technical and engineering tasks. DFRC also contributed their engineering knowledge through their contributions in the areas of autonomous ground taxi control development, structural dynamics testing and analysis and the provision of other flight test support including telemetry data, tracking radars, and communications and control support equipment. The Air Force Flight Test Center acted at the Deputy Project Manager in this effort and was responsible for the provision of system safety support and airfield management and air traffic control services, among other supporting roles. The T-33 served as a J-UCAS surrogate aircraft and demonstrated flight characteristics similar to that of the the X-45A. The surrogate served as a significant risk reduction resource providing mission planning verification, range safety mission assessment and team training, among other contributions.

  13. Final Report on Portable Laser Coating Removal Systems Field Demonstrations and Testing

    Science.gov (United States)

    Rothgeb, Matthew J.; McLaughlin, Russell L.

    2008-01-01

    to evaluate the best performers on processes and coatings specific to the agency. Laser systems used during this project were all of a similar design, most of which had integrated vacuum systems in order to collect materials removed from substrate surfaces during operation. Due to the fact that the technology lends itself to a bide variety of processes, several site demonstrations were organized in order to allow for greater evaluation of the laser systems across NASA. The project consisted of an introductory demonstration and a more in-depth evaluation at Wright-Patterson Air Force Base. Additionally, field demonstrations occurred at Glenn Research Center and Kennedy Space Center. During these demonstrations several NASA specific applications were evaluated, including the removal of coatings within Orbiter tile cavities and Teflon from Space Shuttle Main Engine gaskets, removal of heavy grease from Solid Rocket Booster components and the removal of coatings on weld lines for Shuttle and general ground service equipment for non destructive evaluation (NDE). In addition, several general industry applications such as corrosion removal, structural coating removal, weld-line preparation and surface cleaning were evaluated. This included removal of coatings and corrosion from surfaces containing lead-based coatings and applications similar to launch-structure maintenance and Crawler maintenance. During the project lifecycle, an attempt was made to answer process specific concerns and questions as they arose. Some of these initially unexpected questions concerned the effects lasers might have on substrates used on flight equipment including strength, surface re-melting, substrate temperature and corrosion resistance effects. Additionally a concern was PPE required for operating such a system including eye, breathing and hearing protection. Most of these questions although not initially planned, were fully explored as a part of this project. Generally the results from tesng

  14. Planning and Analysis of Fractured Rock Injection Tests in the Cerro Brillador Underground Laboratory, Northern Chile

    Science.gov (United States)

    Fairley, J. P., Jr.; Oyarzún L, R.; Villegas, G.

    2015-12-01

    Early theories of fluid migration in unsaturated fractured rock hypothesized that matrix suction would dominate flow up to the point of matrix saturation. However, experiments in underground laboratories such as the ESF (Yucca Mountain, NV) have demonstrated that liquid water can migrate significant distances through fractures in an unsaturated porous medium, suggesting limited interaction between fractures and unsaturated matrix blocks and potentially rapid transmission of recharge to the sat- urated zone. Determining the conditions under which this rapid recharge may take place is an important factor in understanding deep percolation processes in arid areas with thick unsaturated zones. As part of an on-going, Fondecyt-funded project (award 11150587) to study mountain block hydrological processes in arid regions, we are plan- ning a series of in-situ fracture flow injection tests in the Cerro Brillador/Mina Escuela, an underground laboratory and teaching facility belonging to the Universidad la Serena, Chile. Planning for the tests is based on an analytical model and curve-matching method, originally developed to evaluate data from injection tests at Yucca Mountain (Fairley, J.P., 2010, WRR 46:W08542), that uses a known rate of liquid injection to a fracture (for example, from a packed-off section of borehole) and the observed rate of seepage discharging from the fracture to estimate effective fracture aperture, matrix sorptivity, fracture/matrix flow partitioning, and the wetted fracture/matrix interac- tion area between the injection and recovery points. We briefly review the analytical approach and its application to test planning and analysis, and describe the proposed tests and their goals.

  15. Demonstration of the zero-crossing phasemeter with a LISA test-bed interferometer

    Science.gov (United States)

    Pollack, S. E.; Stebbins, R. T.

    2006-06-01

    The laser interferometer space antenna (LISA) is being designed to detect and study in detail gravitational waves from sources throughout the Universe such as massive black hole binaries. The conceptual formulation of the LISA space-borne gravitational wave detector is now well developed. The interferometric measurements between the sciencecraft remain one of the most important technological and scientific design areas for the mission. Our work has concentrated on developing the interferometric technologies to create a LISA-like optical signal and to measure the phase of that signal using commercially available instruments. One of the most important goals of this research is to demonstrate the LISA phase timing and phase reconstruction for a LISA-like fringe signal, in the case of a high fringe rate and a low signal level. We present current results of a test-bed interferometer designed to produce an optical LISA-like fringe signal previously discussed in Jennrich O, Stebbins R T, Bender P L and Pollack S (2001 Class. Quantum Grav. 18 4159 64) and Pollack S E, Jennrich O, Stebbins R T and Bender P (2003 Class. Quantum Grav. 20 S291 00).

  16. Demonstration of the zero-crossing phasemeter with a LISA test-bed interferometer

    Energy Technology Data Exchange (ETDEWEB)

    Pollack, S E [JILA, University of Colorado, Boulder, CO 80309-0440 (United States); Stebbins, R T [NASA/GSFC Code 661, Greenbelt, MD 20771 (United States)

    2006-06-21

    The laser interferometer space antenna (LISA) is being designed to detect and study in detail gravitational waves from sources throughout the Universe such as massive black hole binaries. The conceptual formulation of the LISA space-borne gravitational wave detector is now well developed. The interferometric measurements between the sciencecraft remain one of the most important technological and scientific design areas for the mission. Our work has concentrated on developing the interferometric technologies to create a LISA-like optical signal and to measure the phase of that signal using commercially available instruments. One of the most important goals of this research is to demonstrate the LISA phase timing and phase reconstruction for a LISA-like fringe signal, in the case of a high fringe rate and a low signal level. We present current results of a test-bed interferometer designed to produce an optical LISA-like fringe signal previously discussed in Jennrich O, Stebbins R T, Bender P L and Pollack S (2001 Class. Quantum Grav. 18 4159-64) and Pollack S E, Jennrich O, Stebbins R T and Bender P (2003 Class. Quantum Grav. 20 S291-00)

  17. Test Summary Report INEEL Sodium-Bearing Waste Vitrification Demonstration RSM-01-1

    Energy Technology Data Exchange (ETDEWEB)

    Goles, Ronald W.; Perez, Joseph M.; Macisaac, Brett D.; Siemer, Darryl D.; Mccray, John A.

    2001-05-21

    The U.S. Department of Energy's Idaho National Engineering and Environmental Laboratory is storing large amounts of radioactive and mixed wastes. Most of the sodium-bearing wastes have been calcined, but about a million gallons remain uncalcined, and this waste does not meet current regulatory requirements for long-term storage and/or disposal. As a part of the Settlement Agreement between DOE and the State of Idaho, the tanks currently containing SBW are to be taken out of service by December 31, 2012, which requires removing and treatment the remaining SBW. Vitrification is the option for waste disposal that received the highest weighted score against the criteria used. Beginning in FY 2000, the INEEL high-level waste program embarked on a program for technology demonstration and development that would lead to conceptual design of a vitrification facility in the event that vitrification is the preferred alternative for SBW disposal. The Pacific Northwest National Laborator's Research-Scale Melter was used to conduct these initial melter-flowsheet evaluations. Efforts are underway to reduce the volume of waste vitrified, and during the current test, an overall SBW waste volume-reduction factor of 7.6 was achieved.

  18. Flutter Analysis of a Morphing Wing Technology Demonstrator: Numerical Simulation and Wind Tunnel Testing

    Directory of Open Access Journals (Sweden)

    Andreea KOREANSCHI

    2016-03-01

    Full Text Available As part of a morphing wing technology project, the flutter analysis of two finite element models and the experimental results of a morphing wing demonstrator equipped with aileron are presented. The finite element models are representing a wing section situated at the tip of the wing; the first model corresponds to a traditional aluminium upper surface skin of constant thickness and the second model corresponds to a composite optimized upper surface skin for morphing capabilities. The two models were analyzed for flutter occurrence and effects on the aeroelastic behaviour of the wing were studied by replacing the aluminium upper surface skin of the wing with a specially developed composite version. The morphing wing model with composite upper surface was manufactured and fitted with three accelerometers to record the amplitudes and frequencies during tests at the subsonic wind tunnel facility at the National Research Council. The results presented showed that no aeroelastic phenomenon occurred at the speeds, angles of attack and aileron deflections studied in the wind tunnel and confirmed the prediction of the flutter analysis on the frequencies and modal displacements.

  19. D-area oil seepage basin bioventing optimization test plan

    Energy Technology Data Exchange (ETDEWEB)

    Berry, C.J.; Radway, J.C.; Alman, D.; Hazen, T.C.

    1998-12-31

    The D Area Oil Seepage Basin (DOSB) was used from 1952 to 1975 for disposal of petroleum-based products (waste oils), general office and cafeteria waste, and apparently some solvents [trichloroethylene (TCE)/tetrachloroethylene (PCE)]. Numerous analytical results have indicated the presence of TCE and its degradation product vinyl chloride in groundwater in and around the unit, and of petroleum hydrocarbons in soils within the unit. The DOSB is slated for additional assessment and perhaps for environmental remediation. In situ bioremediation represents a technology of demonstrated effectiveness in the reclamation of sites contaminated with petroleum hydrocarbons and chlorinated solvents, and has been retained as an alternative for the cleanup of the DOSB. The Savannah River Site is therefore proposing to conduct a field treatability study designed to demonstrate and optimize the effectiveness of in situ microbiological biodegradative processes at the DOSB. The introduction of air and gaseous nutrients via two horizontal injection wells (bioventing) is expected to enhance biodegradation rates of petroleum components and stimulate microbial degradation of chlorinated solvents. The data gathered in this test will allow a determination of the biodegradation rates of contaminants of concern in the soil and groundwater, allow an evaluation of the feasibility of in situ bioremediation of soil and groundwater at the DOSB, and provide data necessary for the functional design criteria for the final remediation system.

  20. D-area oil seepage basin bioventing optimization test plan

    Energy Technology Data Exchange (ETDEWEB)

    Berry, C.J.; Radway, J.C.; Alman, D.; Hazen, T.C.

    1998-12-31

    The D Area Oil Seepage Basin (DOSB) was used from 1952 to 1975 for disposal of petroleum-based products (waste oils), general office and cafeteria waste, and apparently some solvents [trichloroethylene (TCE)/tetrachloroethylene (PCE)]. Numerous analytical results have indicated the presence of TCE and its degradation product vinyl chloride in groundwater in and around the unit, and of petroleum hydrocarbons in soils within the unit. The DOSB is slated for additional assessment and perhaps for environmental remediation. In situ bioremediation represents a technology of demonstrated effectiveness in the reclamation of sites contaminated with petroleum hydrocarbons and chlorinated solvents, and has been retained as an alternative for the cleanup of the DOSB. The Savannah River Site is therefore proposing to conduct a field treatability study designed to demonstrate and optimize the effectiveness of in situ microbiological biodegradative processes at the DOSB. The introduction of air and gaseous nutrients via two horizontal injection wells (bioventing) is expected to enhance biodegradation rates of petroleum components and stimulate microbial degradation of chlorinated solvents. The data gathered in this test will allow a determination of the biodegradation rates of contaminants of concern in the soil and groundwater, allow an evaluation of the feasibility of in situ bioremediation of soil and groundwater at the DOSB, and provide data necessary for the functional design criteria for the final remediation system.

  1. A test of motor (not executive) planning in developmental coordination disorder and autism

    NARCIS (Netherlands)

    van Swieten, L.M.; van Bergen, E.; Williams, J.H.G.; Wilson, A.D.; Plumb, M.S.; Kent, S.W.; Mon-Williams, M.A.

    2010-01-01

    Grip selection tasks have been used to test "planning" in both autism and developmental coordination disorder (DCD). We differentiate between motor and executive planning and present a modified motor planning task. Participants grasped a cylinder in 1 of 2 orientations before turning it clockwise or

  2. MSFC Doppler Lidar Science experiments and operations plans for 1981 airborne test flight

    Science.gov (United States)

    Fichtl, G. H.; Bilbro, J. W.; Kaufman, J. W.

    1981-01-01

    The flight experiment and operations plans for the Doppler Lidar System (DLS) are provided. Application of DLS to the study of severe storms and local weather penomena is addressed. Test plans involve 66 hours of flight time. Plans also include ground based severe storm and local weather data acquisition.

  3. 40 CFR 63.9915 - What test methods and other procedures must I use to demonstrate initial compliance with dioxin...

    Science.gov (United States)

    2010-07-01

    ... must I use to demonstrate initial compliance with dioxin/furan emission limits? 63.9915 Section 63.9915....9915 What test methods and other procedures must I use to demonstrate initial compliance with dioxin... limit for dioxins/furans in Table 1 to this subpart, you must follow the test methods and procedures...

  4. Test Plan for Radioactive Testing of a Vertical Direct Denitration Calciner

    Energy Technology Data Exchange (ETDEWEB)

    COMPTON, J.A.

    2000-02-03

    Stored solutions containing plutonium and nitric acid and possibly uranium thorium and minor amounts of other substances will be used for development and demonstration of a vertical calciner direct denitration process for conversion of those to stable storable PuO{sub 2} rich solids. Some of those solutions are quite dilute and very impure these require either pretreatment to make them suitable for calciner feed or an alternate stabilization method. Untreated scrap solutions containing some amounts of sulfate phosphate sodium and/or potassium may also be tested for suitability of direct denitration for conversion directly to PuO{sub 2}-rich solids. A vertical calciner will be used to demonstrate the direct denitration process for converting plutonium-bearing liquors to stable plutonium-rich solids. The calciner and some of its ancillary equipment were previously tested with non-radioactive chemicals to demonstrate operability.

  5. Test Plan for Radioactive Testing of a Vertical Direct Denitration Calciner

    Energy Technology Data Exchange (ETDEWEB)

    COMPTON, J.A.

    2000-02-03

    Stored solutions containing plutonium and nitric acid and possibly uranium thorium and minor amounts of other substances will be used for development and demonstration of a vertical calciner direct denitration process for conversion of those to stable storable PuO{sub 2} rich solids. Some of those solutions are quite dilute and very impure these require either pretreatment to make them suitable for calciner feed or an alternate stabilization method. Untreated scrap solutions containing some amounts of sulfate phosphate sodium and/or potassium may also be tested for suitability of direct denitration for conversion directly to PuO{sub 2}-rich solids. A vertical calciner will be used to demonstrate the direct denitration process for converting plutonium-bearing liquors to stable plutonium rich solids. The calciner and some of its associated equipment were previously tested with non-radioactive chemicals to demonstrate operability.

  6. Propulsion System Testing for the Iodine Satellite (iSAT) Demonstration Mission

    Science.gov (United States)

    Polzin, Kurt A.; Kamhawi, Hani

    2015-01-01

    vacuum chamber (it is under 10(exp -6) torr at -75 C), making it possible to 'cryopump' the propellant with lower-cost recirculating refrigerant-based systems as opposed to using liquid nitrogen or low temperature gaseous helium cryopanels. An iodine-based system is not without its challenges. The primary challenge is that the entire feed system must be maintained at an elevated temperature to prevent the iodine from depositing (transitioning from the gas phase directly back into the solid phase), which will block the propellant feed lines. Furthermore, deposition will occur unless the temperature in the lines is not greater than the temperature of the propellant reservoir. The flow rate can be controlled by adjusting the heating applied to the reservoir, but as with any thermal control there is a relatively slow response to changes in the heating rate. In the present paper, we describe the propulsion and propellant feed system for the iodine satellite (iSAT) flight demonstration mission. The system is based around the Busek BHT-200 Hall thruster, which has been modified for chemical compatibility with iodine vapor. While the gross propellant flow rate is maintained by the heated propellant reservoir, the flow to the anode and cathode are adjusted using two heated Vacco proportional flow control valves (PFCV), which provide very fast response on the flow rate adjustment. The flight mission design layout will be presented, showing how the system will be packaged into the overall 12-U spacecraft and the techniques being employed to protect the remaining spacecraft hardware from the propulsion system (e.g., plasma impingement, iodine deposition, thermal loads). In addition to the flight system design, results of testing the thruster and cathode with both operating on iodine propellant are presented. The tests are conducted on a thrust stand (see Fig. 1) in a large vacuum chamber containing a beam dump chilled to below -100 C to 'cryopump' the propellant. The thruster

  7. Mitigating Agricultural Diffuse Pollution: Learning from The River Eden Demonstration Test Catchment Experiments

    Science.gov (United States)

    Reaney, S. M.; Barker, P. A.; Haygarth, P.; Quinn, P. F.; Aftab, A.; Barber, N.; Burke, S.; Cleasby, W.; Jonczyk, J. C.; Owen, G. J.; Perks, M. T.; Snell, M. A.; Surridge, B.

    2016-12-01

    Freshwater systems continue to fail to achieve their ecological potential and provide associated ecological services due to poor water quality. A key driver of the failure to achieve good status under the EU Water Framework Directive derives from non-point (diffuse) pollution of sediment, phosphorus and nitrogen from agricultural landscapes. While many mitigation options exist, a framework is lacking which provides a holistic understanding of the impact of mitigation scheme design on catchment function and agronomics. The River Eden Demonstration Test Catchment project (2009-2017) in NW England uses an interdisciplinary approach including catchment hydrology, sediment-nutrient fluxes and farmer attitudes, to understand ecological function and diffuse pollution mitigation feature performance. Water flow (both surface and groundwater) and quality monitoring focused on three ca. 10km2 catchments with N and P measurements every 30 minutes. Ecological status was determined by monthly diatom community analysis and supplemented by macrophyte, macroinvertebrate and fish surveys. Changes in erosion potential and hydrological connectivity were monitored using extensive Landsat images and detailed UAV monitoring. Simulation modelling work utilised hydrological simulation models (CRAFT, CRUM3 and HBV-Light) and SCIMAP based risk mapping. Farmer behaviour and attitudes have been assessed with surveys, interviews and diaries. A suite of mitigation features have been installed including changes to land management - e.g. aeriation, storage features within a `treatment train', riparian fencing and woodland creation. A detailed dataset of the integrated catchment hydrological, water quality and ecological behaviour over multiple years, including a drought period and an extreme rainfall event, highlights the interaction between ecology, hydrological and nutrient dynamics that are driven by sediment and nutrients exported within a small number of high magnitude storm events. Hence

  8. The importance of pre-planning for large hydrostatic test programs

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Andrew Keith [WorleyParsons Calgary, Calgary, AB (Canada); Wong, Everett Clementi [Enbridge Pipelines Inc., Edmonton, AB (Canada)

    2010-07-01

    During the design phase of a pipeline project, large hydrostatic test programs are required to locate and secure water sources. Many companies complete hydrostatic test planning through high level desktop analysis, however this technique can result in important unplanned costs and schedule delays. The aim of this paper is to assess the cost benefits of pre-planning large hydrostatic test programs versus the costs of unplanned delays in the execution of hydrostatic testing. This comparison was based on the successful application of pre-planning of 57 mainline hydrostatic tests in the construction of the Line 4 Extension and Alberta Clipper Expansion oil pipelines by Enbridge Pipelines Inc. Results showed that costs of delays and uncertainty during construction far outweigh the costs of pre-planning. This study highlighted that pre-planning for large hydrostatic test programs should be carried out in the execution of large pipeline projects to ensure success.

  9. Discussion on Modern Agricultural Science and Technology Demonstration Garden with the Guiding of Agricultural Ecotourism-analyzing Conception Planning for Modern Agricultural Science and Technology Demonstration Field of Ten Thousands’ Mu Coffee and Nuts of Huaqiaoba

    Directory of Open Access Journals (Sweden)

    Yang Liu

    2013-03-01

    Full Text Available Modern agricultural science and technology demonstration fields emerge and flourish with the increasing of the adjustment of agricultural industrial structure and the rising of characteristic ecotourism. The study tried to discuss the modern agricultural science and technology demonstration garden with the guiding of agricultural ecotourism by analyzing conception planning for modern agricultural science and technology demonstration field of ten thousands’ Mu coffee and nuts in Huaqiaoba, Mangshi, Dehong, Yunnan. The planning respected current situation of natural ecology, established a tourism theme image of “planting coffee trees and also drawing golden phoenixes” in view of SWOT analyzing of ecotourism, put forward a planning idea of “nature and ecology, culture and human, science and technology and modern” and especially expounded the structure of total planning layout of “one axis, one circle, one nucleus, sixteen areas and twenty four points” and the contents of specific functional areas around three key functions: coffee planting demonstration, agricultural ecotourism, industrial leisure vacation.

  10. Testing and monitoring plan for the permanent isolation surface barrier prototype

    Energy Technology Data Exchange (ETDEWEB)

    Gee, G.W.; Cadwell, L.L.; Freeman, H.D.; Ligotke, M.W.; Link, S.O.; Romine, R.A.; Walters, W.H. Jr.

    1993-06-01

    This document is a testing and monitoring plan for a prototype barrier to be constructed at the Hanford Site in 1993. The prototype barrier is an aboveground structure engineered to demonstrate the basic features of an earthen cover system, designed to permanently isolate waste from the biosphere. These features include multiple layers of soil and rock materials and a low-permeability asphalt sublayer. The surface of the barrier consists of silt loam soil, vegetated with plants. The barrier sides are reinforced with rock or coarse earthen-fill to protect against wind and water erosion. The sublayers inhibit plant and animal intrusion and percolation of water. A series of tests will be conducted on the prototype over the next several years to evaluate barrier performance under extreme climatic conditions.

  11. Tank 241-AZ-101 Mixer Pump Test Vapor Sampling and Analysis Plan

    Energy Technology Data Exchange (ETDEWEB)

    TEMPLETON, A.M.

    2000-04-10

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples obtained during the operation of mixer pumps in tank 241-AZ-101. The primary purpose of the mixer pump test (MPT) is to demonstrate that the two 300 horsepower mixer pumps installed in tank 241-AZ-101 can mobilize the settled sludge so that it can be retrieved for treatment and vitrification. Sampling will be performed in accordance with Tank 241-AZ-101 Mixer Pump Test Data Quality Objective (Banning 1999) and Data Quality Objectives for Regulatory Requirements for Hazardous and Radioactive Air Emissions Sampling and Analysis (Mulkey 1999). The sampling will verify if current air emission estimates used in the permit application are correct and provide information for future air permit applications.

  12. Tank 241-AZ-101 Mixer Pump Test Vapor Sampling and Analysis Plan

    Energy Technology Data Exchange (ETDEWEB)

    TEMPLETON, A.M.

    2000-03-06

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples obtained during the operation of mixer pumps in tank 241-AZ-101. The primary purpose of the mixer pump test (MPT) is to demonstrate that the two 300 horsepower mixer pumps installed in tank 241-AZ-101 can mobilize the settled sludge so that it can be retrieved for treatment and vitrification. Sampling will be performed in accordance with Tank 241-AZ-101 Mixer Pump Test Data Quality Objective (Banning 1999) and Data Quality Objectives for Regulatory Requirements for Hazardous and Radioactive Air Emissions Sampling and Analysis (Mulkey 1999). The sampling will verify if current air emission estimates used in the permit application are correct and provide information for future air permit applications.

  13. Tank 241-AZ-101 Mixer Pump Test Vapor Sampling and Analysis Plan

    Energy Technology Data Exchange (ETDEWEB)

    TEMPLETON, A.M.

    2000-01-31

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples obtained during the operation of mixer pumps in tank 241-AZ-101. The primary purpose of the mixer pump test (MPT) is to demonstrate that the two 300 horsepower mixer pumps installed in tank 241-AZ-101 can mobilize the settled sludge so that it can be retrieved for treatment and vitrification Sampling will be performed in accordance with Tank 241-AZ-101 Mixer Pump Test Data Quality Objective (Banning 1999) and Data Quality Objectives for Regulatory Requirements for Hazardous and Radioactive Air Emissions Sampling and Analysis (Mulkey 1999). The sampling will verify if current air emission estimates used in the permit application are correct and provide information for future air permit applications.

  14. Development of a smart-antenna test-bed, demonstrating software defined digital beamforming

    NARCIS (Netherlands)

    Kluwer, T.; Slump, C.H.; Schiphorst, R.; Hoeksema, F.W.

    2001-01-01

    This paper describes a smart-antenna test-bed consisting of ‘common of the shelf’ (COTS) hardware and software defined radio components. The use of software radio components enables a flexible platform to implement and test mobile communication systems as a real-world system. The test-bed is configu

  15. DEMONSTRATION BULLETIN: HNU-HANBY PCP IMMUNOASSAY TEST KIT - HNU - SYSTEMS, INC.

    Science.gov (United States)

    The HNU-Hanby test kit rapidly analyzes for petroleum hydrocarbons in soil and water samples. The test kit can be used to estimate pentachlorophenol (PCP) concentrations in samples when the carrier solvent is a petroleum hydrocarbon. The test kit estimates PCP concentrations in ...

  16. Electrodril system field test program. Phase II: Task C-1-deep drilling system demonstration. Final report for Phase II: Task C-1

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, P D

    1981-04-01

    The Electrodril Deep Drilling System field test demonstrations were aborted in July 1979, due to connector problems. Subsequent post test analyses concluded that the field replacable connectors were the probable cause of the problems encountered. The designs for both the male and female connectors, together with their manufacturing processes, were subsequently modified, as was the acceptance test procedures. A total of nine male and nine female connectors were manufactured and delivered during the 2nd Quarter 1980. Exhaustive testing was then conducted on each connector as a precursor to formal qualification testing conducted during the month of October 1980, at the Brown Oil Tool test facility located in Houston, Texas. With this report, requirements under Phase II, Task C-1 are satisfied. The report documents the results of the connector qualification test program which was successfully completed October 28, 1980. In general, it was concluded that connector qualification had been achieved and plans are now in progress to resume the field test demonstration program so that Electrodril System performance predictions and economic viability can be evaluated.

  17. Electrodril system field test program. Phase II: Task C-1-deep drilling system demonstration. Final report for Phase II: Task C-1

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, P D

    1981-04-01

    The Electrodril Deep Drilling System field test demonstrations were aborted in July 1979, due to connector problems. Subsequent post test analyses concluded that the field replacable connectors were the probable cause of the problems encountered. The designs for both the male and female connectors, together with their manufacturing processes, were subsequently modified, as was the acceptance test procedures. A total of nine male and nine female connectors were manufactured and delivered during the 2nd Quarter 1980. Exhaustive testing was then conducted on each connector as a precursor to formal qualification testing conducted during the month of October 1980, at the Brown Oil Tool test facility located in Houston, Texas. With this report, requirements under Phase II, Task C-1 are satisfied. The report documents the results of the connector qualification test program which was successfully completed October 28, 1980. In general, it was concluded that connector qualification had been achieved and plans are now in progress to resume the field test demonstration program so that Electrodril System performance predictions and economic viability can be evaluated.

  18. The Ontario nursing workload demonstration projects: rethinking how we measure, cost and plan the work of nurses.

    Science.gov (United States)

    Ferguson-Paré, Mary; Bandurchin, Annabelle

    2010-05-01

    In 2008 the Nursing Secretariat of Ontario's Ministry of Health and Long-Term Care formed a Nursing Workload Steering Committee to oversee the implementation of three demonstration projects with the objectives: to assess the feasibility of Health Outcomes for Better Information and Care (HOBIC) data as a measure of nursing workload, determine the indicators that best support nurse leaders to measure nursing work and make informed staffing decisions, and develop a model that predicts acute care nursing costs. Three HOBIC scales--activities of daily living (ADLs), continence and fatigue--explained a small amount of the variance in nurse judgment of the amount of nursing time patients require in the first 24 hours of care. Nurses in the study appreciated providing their professional judgment to help estimate the nursing work requirements of patients. The priority and secondary indicators most important for decision-making included medical severity of patients, environmental complexity, nurse experience, patient turnover, nurse-to-patient ratio, cognitive status, infection control, nurse vacancy, predictability of patient types, nursing interventions, patient volumes, co-morbidities, patient self-care abilities, physical and psychosocial functioning, unit type and medical diagnosis. A fairly robust model was developed using existing data sources to estimate nursing input into a patient's costs. The model explained between 69% and 80% of the variation in nursing costs for each patient. In order to effectively measure, plan and cost nursing, we need to determine what nursing is. In the future, recognition of nurses as knowledge workers will require us to consider the many patient and environmental factors that affect the ability of nurses to apply their professional judgment to care for patients.

  19. Design, Test and Demonstration of Saturable Reactor High-Temperature Superconductor Fault Current Limiters

    Energy Technology Data Exchange (ETDEWEB)

    Darmann, Frank [Zenergy Power, Inc., Burlingame, CA (United States); Lombaerde, Robert [Zenergy Power, Inc., Burlingame, CA (United States); Moriconi, Franco [Zenergy Power, Inc., Burlingame, CA (United States); Nelson, Albert [Zenergy Power, Inc., Burlingame, CA (United States)

    2012-03-01

    Zenergy Power has successfully designed, built, tested, and installed in the US electrical grid a saturable reactor Fault Current Limiter. Beginning in 2007, first as SC Power Systems and from 2008 as Zenergy Power, Inc., ZP used DOE matching grant and ARRA funds to help refine the design of the saturated reactor fault current limiter. ZP ultimately perfected the design of the saturated reactor FCL to the point that ZP could reliably design a suitable FCL for most utility applications. Beginning with a very basic FCL design using 1G HTS for a coil housed in a LN2 cryostat for the DC bias magnet, the technology progressed to a commercial system that was offered for sale internationally. Substantial progress was made in two areas. First, the cryogenics cooling system progressed from a sub-cooled liquid nitrogen container housing the HTS coils to cryostats utilizing dry conduction cooling and reaching temperatures down to less than 20 degrees K. Large, round cryostats with warm bore diameters of 1.7 meters enabled the design of large tanks to hold the AC components. Second, the design of the AC part of the FCL was refined from a six legged spider design to a more compact and lighter design with better fault current limiting capability. Further refinement of the flux path and core shape led to an efficient saturated reactor design requiring less Ampere-turns to saturate the core. In conclusion, the development of the saturable reactor FCL led to a more efficient design not requiring HTS magnets and their associated peripheral equipment, which yielded a more economical product in line with the electric utility industry expectations. The original goal for the DOE funding of the ZP project Design, Test and Demonstration of Saturable Reactor High-Temperature Superconductor Fault Current Limiters was to stimulate the HTS wire industry with, first 1G, then 2G, HTS wire applications. Over the approximately 5 years of ZP's product development program, the amount of HTS

  20. The River EdenDTC Project: A National Demonstration Test Catchment

    Science.gov (United States)

    Benskin, C.; Surridge, B.; Deasy, C.; Woods, C.; Rimmer, D.; Lees, E.; Owens, G.; Jonczyk, J.; Quinton, J.; Wilkinson, M.; Perks, M.; Quinn, P.; Barker, P.; Haygarth, P.; Burke, S.; Reaney, S.; Watson, N.

    2012-04-01

    Our environment is a complex system of interactions between natural process and anthropogenic activities that disrupt them. It is crucial to manage the balance for continued food production whilst maintaining the quality of the environment. The challenges we face include managing the impact of agricultural land use on aquatic quality and biodiversity as an integral system, rather than as separate issues. In order to do this, it is critical to understand how the different components are linked - how does land use affect our water courses and ground water, and their associated ecosystems, and how can the impact of agricultural land use on these systems be minimised? Regulating farm nutrient management through measures that minimise sources, their exposure to mobilisation, and reduce drainage pathways to water courses are all fundamental to the UK's approach to meeting the Water Framework Directive objective of achieving 'good ecological status' in all surface and groundwater bodies by 2015. The EdenDTC project is part of a 5-year national Demonstration Test Catchments (DTC) environmental scheme, aiming to understand the above issues through combining scientific research with local knowledge and experience from multiple stakeholders. The DTC project is a 5-year initiative by Defra, Welsh Assembly Government and the Environment Agency, which encompasses a research platform covering three distinct river catchments: the Eden in Cumbria; the Wensum in Norfolk; and the Avon in Hampshire. Within the EdenDTC, the impact and effects of multiple diffuse pollutants on ecosystems and sustainable food production are being studied on a river catchment scale. Three 10 km2 focus catchments, selected to represent the different farming practices and geologies observed across the Eden, have been instrumented to record the dynamics of agricultural diffuse pollution at multiple scales. Within each focus catchment, two sub-catchments were selected: one control and one mitigation, in which

  1. Phase II test plan for the evaluation of the performance of container filling systems

    Energy Technology Data Exchange (ETDEWEB)

    BOGER, R.M.

    1999-09-28

    The PHMC will provide tank wastes for final treatment by BNFL from Hanford's waste tanks. Concerns about the ability for ''grab'' sampling to provide large volumes of representative waste samples has led to the development of a nested, fixed-depth sampling system. Preferred concepts for filling sample containers that meet RCRA organic sample criteria were identified by a PHMC Decision Board. These systems will replace the needle based sampling ''T'' that is currently on the sampling system. This test plan document identifies cold tests with simulants that will demonstrate the preferred bottle filling concepts abilities to provide representative waste samples and will meet RCRA criteria. Additional tests are identified that evaluate the potential for cross-contamination between samples and the ability for the system to decontaminate surfaces which have contacted tank wastes. These tests will be performed with kaolid/water and sand/water slurry simulants in the test rig that was used by AEAT to complete Phase 1 tests in FY 1999.

  2. Analyzing the performance of the planning system by use of AAPM TG 119 test cases.

    Science.gov (United States)

    Nithya, L; Raj, N Arunai Nambi; Rathinamuthu, Sasikumar; Pandey, Manish Bhushan

    2016-01-01

    Our objective in this study was to create AAPM TG 119 test plans for intensity-modulated radiation therapy (IMRT) and volumetric-modulated arc therapy (VMAT) in the Monaco planning system. The results were compared with the published studies, and the performance of the Monaco planning system was analyzed. AAPM TG 119 proposed a set of test cases called multi-target, mock prostate, mock head and neck and C-shape to ascertain the overall accuracy of IMRT planning, measurement, and analysis. We used these test cases to investigate the performance of the Monaco planning system for the complex plans. For these test cases, we created IMRT plans with static multi-leaf collimator (MLC) and dynamic MLC by using 7-9 static beams as explained in TG-119. VMAT plans were also created with a 320° arc length and a single or double arc. The planning objectives and dose were set as described in TG 119. The dose prescriptions for multi-target, mock prostate, mock head and neck, and C-shape were taken as 50, 75.6, 50 and 50 Gy, respectively. All plans were compared with the results of TG 119 and the study done by Mynampati et al. Point dose and fluence measurements were done with a CC13 chamber and ArcCHECK phantom, respectively. Gamma analysis was done for the calculated and measured dose. Using the Monaco planning system, we achieved the goals mentioned in AAPM TG-119, and the plans were comparable to those of other studies. A comparison of point dose and fluence showed good results. From these results, we conclude that the performance of the Monaco planning system is good for complex plans.

  3. Joint Logistics Over-the-Shore II. Test and Evaluation. Photographic Summary Report. Deployment Test, RO/RO Test, Throughput Test, Demonstrations.

    Science.gov (United States)

    2014-09-26

    14 0 Deployment Test Introduction............................................. 17 * Deployment Test SEABEE ship ALMERIA ...them to stowage locations on the ship and most importantly, offload that cargo in the objective area. The SEABEE ship ALMERIA LYKES, utilizes an...SS ALMERIA LYKES (SEABEE Ship) 18, 19, 23 SS ATLANTIC BEAR 9,11,13 SS CAPE ANN 50 SS EXPORT LEADER 33, 40, 41, 42, 43, 52, 64 .*l SS KEYSTONE STATE (T

  4. Tested Demonstrations: Diffusion of Gases--Kinetic Molecular Theory of Gases.

    Science.gov (United States)

    Gilbert, George L., Ed.

    1984-01-01

    Provided are procedures and list of materials needed to demonstrate that the pressure inside a container with a porous surface can be changed due to the rate of diffusion of low molecular weight gases. Typical results obtained are included. (JN)

  5. STREAMLINED APPROACH FOR ENVIRONMENTAL RESTORATION PLAN FOR CORRECTIVE ACTION UNIT 116: AREA 25 TEST CELL C FACILITYNEVADA TEST SITE, NEVADA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    This Streamlined Approach for Environmental Restoration Plan identifies the activities required for the closure of Corrective Action Unit 116, Area 25 Test Cell C Facility. The Test Cell C Facility is located in Area 25 of the Nevada Test Site approximately 25 miles northwest of Mercury, Nevada.

  6. Do Linguistic Features of Science Test Items Prevent English Language Learners from Demonstrating Their Knowledge?

    Science.gov (United States)

    Noble, Tracy; Kachchaf, Rachel; Rosebery, Ann; Warren, Beth; O'Connor, Mary Catherine; Wang, Yang

    2014-01-01

    Little research has examined individual linguistic features that influence English language learners (ELLs) test performance. Furthermore, research has yet to explore the relationship between the science strand of test items and the types of linguistic features the items include. Utilizing Differential Item Functioning, this study examines ELL…

  7. Continuous-flow stirred-tank reactor 20-L demonstration test: Final report

    Energy Technology Data Exchange (ETDEWEB)

    Lee, D.D.; Collins, J.L.

    2000-02-01

    One of the proposed methods of removing the cesium, strontium, and transuranics from the radioactive waste storage tanks at Savannah River is the small-tank tetraphenylborate (TPB) precipitation process. A two-reactor-in-series (15-L working volume each) continuous-flow stirred-tank reactor (CSTR) system was designed, constructed, and installed in a hot cell to test the Savannah River process. The system also includes two cross-flow filtration systems to concentrate and wash the slurry produced in the process, which contains the bulk of radioactivity from the supernatant processed through the system. Installation, operational readiness reviews, and system preparation and testing were completed. The first test using the filtration systems, two CSTRs, and the slurry concentration system was conducted over a 61-h period with design removal of Cs, Sr, and U achieved. With the successful completion of Test 1a, the following tests, 1b and 1c, were not required.

  8. Atmospheric Reentry Materials and Structures Evaluation Facility (ARMSEF). User Test Planning Guide

    Science.gov (United States)

    2011-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ARMSEF. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  9. FY'99 final report for the expedited technology demonstration project: demonstration test results for the MSO/off-gas and salt recycle system

    Energy Technology Data Exchange (ETDEWEB)

    Adamson, M G; Hsu, P C

    1999-05-01

    Molten Salt Oxidation (MSO) is a promising alternative to incineration for the treatment of a variety of organic wastes. Lawrence Livermore National Laboratory (LLNL) has prepared a facility in which an integrated pilot-scale MSO treatment system is being tested and demonstrated. The system consists of a MSO vessel with a dedicated off-gas treatment system, a salt recycle system, feed preparation equipment, and a ceramic final waste forms immobilization system. This integrated system was designed and engineered based on operational experience with an engineering-scale reactor unit and extensive laboratory development on salt recycle and final forms preparation. The MSO/off-gas system has been operational since December 1997. The salt recycle system and the ceramic final forms immobilization became operational in May 1998. In FY98, we have tested the MSO facility with various organic feeds, including chlorinated solvents, tributyl phosphate/kerosene, PCB-contaminated waste oils and solvents, booties, plastic pellets, ion exchange resins, activated carbon, radioactive-spiked organics, and well-characterized low-level liquid mixed wastes. MSO is shown to be a versatile technology for hazardous waste treatment and may be a solution to many waste disposal problems in DOE sites. The results of the demonstration conducted in FY98 has been reported [1]. In FY99 (October 1998 to April 1999) we conducted further testing in the MSO/off-gas system with ion exchange resins, two real waste specimens, activated carbon, and TNT-loaded activated carbon, both at regular feed rates and higher feed rates up to a superficial gas velocity of 1.75 ft/s. We also drained the salt three times (SR7, SR8, SR9) in FY99 and sent the spent salts to the salt recycle system for further processing. This report presents the results obtained from the demonstration of the MSO/off-gas system and the salt recycle system from October 1998 to April 1999. We then shut down the operation and cleaned the

  10. Materials and Nondestructive Evaluation Laboratoriers: User Test Planning Guide

    Science.gov (United States)

    Schaschl, Leslie

    2011-01-01

    The Materials and Nondestructive Evaluation Laboratory process, milestones and inputs are unknowns to first-time users. The Materials and Nondestructive Evaluation Laboratory Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware developers. It is intended to assist their project engineering personnel in materials analysis planning and execution. Material covered includes a roadmap of the analysis process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, products, and inputs necessary to define scope of analysis, cost, and schedule are included as an appendix to the guide.

  11. Office of Technology Development Program for Research, Development, Demonstration, Testing, and Evaluation. FY 1993 Program Summary

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    DOE has set a goal to clean up its complex and to bring all sites into compliance with applicable environmental regulations. This initiative is slated for completion by the year 2019. Four years ago there was no coordinated plan for identifying or cleaning these contaminated sites. Since 1989, DOE`s Office of Environmental Restoration and Waste Management has invested time, money, and manpower to establish a wide range of programs to meet this immense challenge. DOE is responsible for waste management and clean up of more than 100 contaminated installations in 36 states and territories. This includes 3,700 sites: over 26,000 acres, with hazardous or radioactive contaminated surface or groundwater, soil, or structures; over 26,000 acres requiring remediation, with the number growing as new sites are defined; 500 surplus facilities awaiting decontamination and decommissioning and approximately 5,000 peripheral properties (residences, businesses) that have soil contaminated with uranium tailings.

  12. Making a Low-Cost Soda Can Ethanol Burner for Out-of-Laboratory Flame Test Demonstrations and Experiments

    Science.gov (United States)

    Yu, Henson L. Lee; Domingo, Perfecto N., Jr.; Yanza, Elliard Roswell S.; Guidote, Armando M., Jr.

    2015-01-01

    This article demonstrates how to make a low-cost ethanol burner utilizing soda cans. It burns with a light blue flame suitable for out-of-laboratory flame test demonstrations where interference from a yellow flame needs to be avoided.

  13. Hawaiian Electric Advanced Inverter Test Plan - Result Summary

    Energy Technology Data Exchange (ETDEWEB)

    Hoke, Anderson; Nelson, Austin; Prabakar, Kumaraguru; Nagarajan, Adarsh

    2016-10-14

    This presentation is intended to share the results of lab testing of five PV inverters with the Hawaiian Electric Companies and other stakeholders and interested parties. The tests included baseline testing of advanced inverter grid support functions, as well as distribution circuit-level tests to examine the impact of the PV inverters on simulated distribution feeders using power hardware-in-the-loop (PHIL) techniques. hardware-in-the-loop (PHIL) techniques.

  14. A Novel Hypoxia Challenge Test Demonstrates Cardiovascular and Pulmonary Susceptibility to Acrolein Gas in Hypertensive Rats.

    Science.gov (United States)

    High levels of air pollution increase the risk of cardiovascular morbidity and mortality, especially in susceptible populations including those with hypertension. Stress tests are useful for manifesting latent effects of exposure, particularly at low concentrations, often when no...

  15. Test plan for the irradiation of nonmetallic materials.

    Energy Technology Data Exchange (ETDEWEB)

    Brush, Laurence H.; Farnum, Cathy Ottinger; Dahl, M.; Joslyn, C. C.; Venetz, T. J.

    2013-05-01

    A comprehensive test program to evaluate nonmetallic materials use in the Hanford tank farms is described in detail. This test program determines the effects of simultaneous multiple stressors at reasonable conditions on in-service configuration components by engineering performance testing.

  16. Test plan for the irradiation of nonmetallic materials.

    Energy Technology Data Exchange (ETDEWEB)

    Brush, Laurence H.; Farnum, Cathy Ottinger; Gelbard, Fred; Dahl, M.; Joslyn, C. C.; Venetz, T. J.

    2013-03-01

    A comprehensive test program to evaluate nonmetallic materials use in the Hanford Tank Farms is described in detail. This test program determines the effects of simultaneous multiple stressors at reasonable conditions on in-service configuration components by engineering performance testing.

  17. Ground Testing a Nuclear Thermal Rocket: Design of a sub-scale demonstration experiment

    Energy Technology Data Exchange (ETDEWEB)

    David Bedsun; Debra Lee; Margaret Townsend; Clay A. Cooper; Jennifer Chapman; Ronald Samborsky; Mel Bulman; Daniel Brasuell; Stanley K. Borowski

    2012-07-01

    In 2008, the NASA Mars Architecture Team found that the Nuclear Thermal Rocket (NTR) was the preferred propulsion system out of all the combinations of chemical propulsion, solar electric, nuclear electric, aerobrake, and NTR studied. Recently, the National Research Council committee reviewing the NASA Technology Roadmaps recommended the NTR as one of the top 16 technologies that should be pursued by NASA. One of the main issues with developing a NTR for future missions is the ability to economically test the full system on the ground. In the late 1990s, the Sub-surface Active Filtering of Exhaust (SAFE) concept was first proposed by Howe as a method to test NTRs at full power and full duration. The concept relied on firing the NTR into one of the test holes at the Nevada Test Site which had been constructed to test nuclear weapons. In 2011, the cost of testing a NTR and the cost of performing a proof of concept experiment were evaluated.

  18. Testing, planning, and redrilling of Geothermal Test Hole GT-2, Phases IV and V. Progress report

    Energy Technology Data Exchange (ETDEWEB)

    Pettitt, R.A.

    1978-12-01

    Holes GT-2 and EE-1 comprise the two deep drill holes of the Los Alamos Hot Dry Rock Geothermal Energy Extraction Experiment. EE-1 had been directionally drilled to intersect a hydraulic fracture extending outward from near the bottom of GT-2, thus completing the underground circulation loop. After the drilling of EE-1, a 16-month period of experimental testing ensued to determine the characteristics of the reservoir. This period is designated as Phase IV and includes work done in GT-2 and EE-1. As a result of this testing, it was determined that parallel fracture zones existed at the bottoms of both holes, and that the impedance to flow between the holes was too high for a meaningful flow experiment. A plan was then adopted to directionally drill out of GT-2 at a depth of about 2600 m (8500 ft) to intersect the fracture zone near the bottom of EE-1 to create a better connection. The directional drilling strategy, cementing practices, bit selections, coring procedures, and logging results comprise the Phase V work.

  19. Front-end Electronics for Unattended Measurement (FEUM). Prototype Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, Ryan C.; Morris, Scott J.; Smith, Leon E.; Keller, Daniel T.

    2015-09-16

    The IAEA has requested that PNNL perform an initial set of tests on front-end electronics for unattended measurement (FEUM) prototypes. The FEUM prototype test plan details the tests to be performed, the criteria for evaluation, and the procedures used to execute the tests.

  20. Autoquan 3, version 3.11, MIDAC Corporation Computer Software Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    HURLBUT, S.T.

    2000-10-24

    This test plan will be performed in conjunction with or prior to HNF-6936, ''HA-53 Supercritical Fluid Extraction System Acceptance Test Plan'', to operate the Fourier transform infrared spectrophotometer (FTIR) and to perform analyses for water. The test will ensure that the software can be installed properly, will operate the FTIR correctly and will generate a text file with analytical data.

  1. Prototypical Rod Consolidation Demonstration Project. Phase 3, Final report: Volume 1, Cold checkout test report, Book 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 1 discusses the following topics: the background of the project; test program description; summary of tests and test results; problem evaluation; functional requirements confirmation; recommendations; and completed test documentation for tests performed in Phase 3.

  2. International test and demonstration of a 1-MW wellhead generator: Helical screw expander power plant

    Science.gov (United States)

    McKay, R. A.

    1984-06-01

    A 1-MW wellhead generator was tested in 1980, 1981, and 1982 by Mexico, Italy, and New Zealand at Cerro Prieto, Cesano, and Broadlands, respectively. The total flow helical screw expander portable power plant, Model 76-1, had been built for the U.S. Government and field-tested in Utah, USA, in 1978 and 1979. The expander had oversized internal clearances designed for self-cleaning operation on fluids that deposit adherent scale normally detrimental to the utiliation of liquid dominated fields. Conditions with which the expander was tested included inlet pressures of 64 to 220 psia, inlet qualities of 0% to 100%, exhaust pressures of 3.1 to 40 psia, electrial loads of idle and 110 to 933 kW, electrical frequencies of 50 and 60 Hz, male rotor speeds of 2500 to 4000 rpm, and fluid characteristics to 310,000 ppm total dissolved solids and noncondensables to 38 wt % of the vapor. Some testing was done on-grid. Typical expander isentropic efficiency was 40% to 50% with the clearances not closed, and 5 percentage points or more higher with the clearances partly closed. The expander efficiency increased approximately logarithmically with shaft power for most operations, while inlet quality, speed, and pressure ratio across the machine had only small effects. These findings are all in agreement with the Utah test results.

  3. 49 CFR 173.467 - Tests for demonstrating the ability of Type B and fissile materials packagings to withstand...

    Science.gov (United States)

    2010-10-01

    ... Type B and fissile materials packagings to withstand accident conditions in transportation. Each Type B packaging or packaging for fissile material must meet the test requirements prescribed in 10 CFR part 71 for... 49 Transportation 2 2010-10-01 2010-10-01 false Tests for demonstrating the ability of Type B...

  4. Demonstration & Testing of ClimaStat for Improved DX Air-Conditioning Efficiency

    Science.gov (United States)

    2013-04-01

    ClimaStat technology installed, which likely results in longer compressor life as well as sustainability of improved efficiency: compressor temperature...Canaveral AFS Demonstration Site Patrick Air Force Base is a 21,500-acre installation located a few miles from Cocoa Beach, FL, about 50 miles east...cooler with ClimaStat technology installed as shown in Figure 6.3-5, which likely will result in longer compressor life as well as sustainability of

  5. Tung FDG Test Facility. Phase 2, Pilot plant demonstration. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Tung FGD Process is a regenerative process which extracts SO{sub 2} from a scrubbing liquor into an organic medium using mixer-settlers followed by steam-stripping the SO{sub 2} off from the organic medium. For the process to operate satisfactorily, (1) the organic must be stable, (2) phase separation must be relatively fast, (3) crud (i.e. solids in-between two phases) must not form and (4) SO{sub 2} must be able to be stripped off from the organic medium readily. The demonstration confirmed that the first three conditions can be met satisfactorily. Much lower stripping efficiency was attained in the pilot plant demonstration than what was previously attained in a bench-scale demonstration. Engineering analysis showed that the pilot plant stripping column was scaled up from the bench-scale column incorrectly. A new scale-up criterion for stripping a relatively viscous liquid medium is proposed based upon pilot plant data.

  6. Search Hanford Accessible Reports Electronically system test plan and documentation: Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    White, E.L.

    1994-12-07

    The purpose of this document is to describe the following items: the approach, resources, and sequence of the testing activities; identifies the components and features to be tested; the personnel responsible for testing; the risks associated with this plan; and test cases and procedures. This document contains all test documentation for the SHARE system. The Search Hanford Accessible Reports Electronically (SHARE) testing process is based upon WHC-CM-3-10, Software Practices, Section SP-3.3 REV 0, and Appendix J REV 0. These procedures and guidelines are based on IEEE Standard 829-1983. The planning in this document was further influenced through guidance in IEEE Standard 1012-1986. This document contains the System, Acceptance, Integration and Component Test Plans, Designs, Procedures, and Cases for SHARE. The Test Cases and procedures have been attached to the document.

  7. Underground test area subproject waste management plan. Revision No. 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    The Nevada Test Site (NTS), located in southern Nevada, was the site of 928 underground nuclear tests conducted between 1951 and 1992. The tests were performed as part of the Atomic Energy Commission and U.S. Department of Energy (DOE) nuclear weapons testing program. The NTS is managed by the DOE Nevada Operations Office (DOE/NV). Of the 928 tests conducted below ground surface at the NTS, approximately 200 were detonated below the water table. As an unavoidable consequence of these testing activities, radionuclides have been introduced into the subsurface environment, impacting groundwater. In the few instances of groundwater sampling, radionuclides have been detected in the groundwater; however, only a very limited investigation of the underground test sites and associated shot cavities has been conducted to date. The Underground Test Area (UGTA) Subproject was established to fill this void and to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the NTS. One of its primary objectives is to gather data to characterize the deep aquifer underlying the NTS.

  8. Wildfire ignition resistant home design(WIRHD) program: Full-scale testing and demonstration final report.

    Energy Technology Data Exchange (ETDEWEB)

    Quarles, Stephen, L.; Sindelar, Melissa

    2011-12-13

    The primary goal of the Wildfire ignition resistant home design(WIRHD) program was to develop a home evaluation tool that could assess the ignition potential of a structure subjected to wildfire exposures. This report describes the tests that were conducted, summarizes the results, and discusses the implications of these results with regard to the vulnerabilities to homes and buildings.

  9. 40 CFR 63.772 - Test methods, compliance procedures, and compliance demonstrations.

    Science.gov (United States)

    2010-07-01

    ... Oil and Natural Gas Production Facilities § 63.772 Test methods, compliance procedures, and compliance... procedures documented in the Gas Research Institute (GRI) report entitled “Atmospheric Rich/Lean Method for...) report entitled “Atmospheric Rich/Lean Method for Determining Glycol Dehydrator Emissions”...

  10. A TEST TO DEMONSTRATE A DIGITAL WEB-BASED OILFIELD DATA COLLECTION SERVICE

    Energy Technology Data Exchange (ETDEWEB)

    Rochelle, J.

    2001-09-30

    The U.S. Department of Energy and HIS Energy tested a web-based field data collection service, FieldDIRECT, at NPR-3. FieldDIRECT provided a way to digitally collect oil and gas data from the field, transfer it quickly, accurately and securely via the Internet, and utilize it immediately to generate executive, operational and administrative reports.

  11. 40 CFR 63.1512 - Performance test/compliance demonstration requirements and procedures.

    Science.gov (United States)

    2010-07-01

    ... of the control device. (g) Dross-only furnace. The owner or operator must conduct a performance test to measure emissions of PM from each dross-only furnace at the outlet of each control device while the unit processes only dross and salt flux as the sole feedstock. (h) In-line fluxer. (1) The owner...

  12. Vadose zone transport field study: Detailed test plan for simulated leak tests

    Energy Technology Data Exchange (ETDEWEB)

    AL Ward; GW Gee

    2000-06-23

    Hanford to: identify mechanisms controlling transport processes in soils typical of the hydrogeologic conditions of Hanford's waste disposal sites; reduce uncertainty in conceptual models; develop a detailed and accurate database of hydraulic and transport parameters for validation of three-dimensional numerical models; identify and evaluate advanced, cost-effective characterization methods with the potential to assess changing conditions in the vadose zone, particularly as surrogates of currently undetectable high-risk contaminants. This plan provides details for conducting field tests during FY 2000 to accomplish these objectives. Details of additional testing during FY 2001 and FY 2002 will be developed as part of the work planning process implemented by the Integration Project.

  13. Prototypical Rod Construction Demonstration Project. Phase 3, Final report: Volume 1, Cold checkout test report, Book 3

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 3 discusses the following topics: Downender Test Results and Analysis Report; NFBC Canister Upender Test Results and Analysis Report; Fuel Assembly Handling Fixture Test Results and Analysis Report; and Fuel Canister Upender Test Results and Analysis Report.

  14. Planned Hypothesis Tests Are Not Necessarily Exempt From Multiplicity Adjustment

    Directory of Open Access Journals (Sweden)

    Andrew V. Frane

    2015-10-01

    Full Text Available Scientific research often involves testing more than one hypothesis at a time, which can inflate the probability that a Type I error (false discovery will occur. To prevent this Type I error inflation, adjustments can be made to the testing procedure that compensate for the number of tests. Yet many researchers believe that such adjustments are inherently unnecessary if the tests were “planned” (i.e., if the hypotheses were specified before the study began. This longstanding misconception continues to be perpetuated in textbooks and continues to be cited in journal articles to justify disregard for Type I error inflation. I critically evaluate this myth and examine its rationales and variations. To emphasize the myth’s prevalence and relevance in current research practice, I provide examples from popular textbooks and from recent literature. I also make recommendations for improving research practice and pedagogy regarding this problem and regarding multiple testing in general.

  15. On eco-planning for an eco-demonstration park (EDP) and sustainability-Case study of the Luhua EDP in the Chongming Island of Shanghai,China

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    The background,concept,connotation,principles,and methods ofeco-planning for an Eco-Demonstration Park (EDP) and sustainability were examined based on a case study of the Luhua EDP in the Chongming Island of Shanghai,China,which is an important part of Shanghai Eco-city planning and construction in the 21st century.By analyzing natural,social and economic conditions,calculating population using the land capacity eco-model,eco-function zoning,and eco-construction,an innovative eco-industrial structure and technical chain were formulated.A comprehensive eco-planning scheme for the EDP was proposed,including planning and management strategies for subsystems of efficient industry,good quality human settlement,high standard eco-construction and eco-tourism as well as effective environmental protection and attractive landscape.The EDP should be an area with coordinated and sustainable economic,social and environmental subsystems.Eco-planning for the EDP should be a very important part of eco-city planning and sustainability.The paper aims to set up a theoretical framework and practical basis for eco-planning and promoting harmony between human and nature.

  16. Specification of the Advanced Burner Test Reactor Multi-Physics Coupling Demonstration Problem

    Energy Technology Data Exchange (ETDEWEB)

    Shemon, E. R. [Argonne National Lab. (ANL), Argonne, IL (United States); Grudzinski, J. J. [Argonne National Lab. (ANL), Argonne, IL (United States); Lee, C. H. [Argonne National Lab. (ANL), Argonne, IL (United States); Thomas, J. W. [Argonne National Lab. (ANL), Argonne, IL (United States); Yu, Y. Q. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2015-12-21

    This document specifies the multi-physics nuclear reactor demonstration problem using the SHARP software package developed by NEAMS. The SHARP toolset simulates the key coupled physics phenomena inside a nuclear reactor. The PROTEUS neutronics code models the neutron transport within the system, the Nek5000 computational fluid dynamics code models the fluid flow and heat transfer, and the DIABLO structural mechanics code models structural and mechanical deformation. The three codes are coupled to the MOAB mesh framework which allows feedback from neutronics, fluid mechanics, and mechanical deformation in a compatible format.

  17. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  18. A Test Apparatus for the MAJORANA DEMONSTRATOR Front-end Electronics

    Science.gov (United States)

    Singh, Harjit; Loach, James; Poon, Alan

    2012-10-01

    One of the most important experimental programs in neutrino physics is the search for neutrinoless double-beta decay. The MAJORANA collaboration is searching for this rare nuclear process in the Ge-76 isotope using HPGe detectors. Each detector is instrumented with high-performance electronics to read out and amplify the signals. The part of the electronics close to the detectors, consisting of a novel front-end circuit, cables and connectors, is made of radio-pure materials and is exceedingly delicate. In this work a dedicated test apparatus was created to benchmark the performance of the electronics before installation in the experiment. The apparatus was designed for cleanroom use, with fixtures to hold the components without contaminating them, and included the electronics necessary for power and readout. In addition to testing, the station will find longer term use in development of future versions of the electronics.

  19. Flood-Fighting Structures Demonstration and Evaluation Program: Laboratory and Field Testing in Vicksburg, Mississippi

    Science.gov (United States)

    2007-07-01

    actual flood conditions. Log impact tests were conducted at a water elevation of 66 percent levee height to model the impact of waterborne debris...sand. A total of 250 cu yd of sand was delivered to the site. An automatic-speed sandbagger, Model ASB-3 (Hogan Manufacturing, Inc.) was rented...Local Sponsor Mr. Renold Minsky , President, Fifth Louisiana Levee Board Mr. Bump Calloway, Director, Warren County (MS) Civil Defense The

  20. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1998

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, T.

    1999-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP) to protect workers, soils, water, and biotic and cultural resources in and around the facility.

  1. INEL/Snake River plain geothermal drilling and testing plan - INEL - 1 well

    Energy Technology Data Exchange (ETDEWEB)

    Miller, L.G.; Prestwich, S.M.; Griffith, J.L.

    1978-12-01

    A plan for drilling a 7500 ft exploratory hole is described. This hole would be drilled at the Idaho National Engineering Laboratory, so that it could be immediately used by one of the government facilties. The plan details the hole design, describes the drilling program, proposes a testing program, and estimates costs. (MHR)

  2. Empirical Test of the Know, See, Plan, Do Model for Curriculum Design in Leadership Education

    Science.gov (United States)

    Martin, Beth Ann; Allen, Scott J.

    2016-01-01

    This research assesses the Know, See, Plan, portions of the Know, See, Plan, Do (KSPD) model for curriculum design in leadership education. There were 3 graduate student groups, each taught using 1 of 3 different curriculum designs (KSPD and 2 control groups). Based on a pretest, post-test design, students' performance was measured to assess their…

  3. Gearbox Reliability Collaborative Phase 3 Gearbox 2 Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Link, H.; Keller, J.; Guo, Y.; McNiff, B.

    2013-04-01

    Gearboxes in wind turbines have not been achieving their expected design life even though they commonly meet or exceed the design criteria specified in current design standards. One of the basic premises of the National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC) is that the low gearbox reliability results from the absence of critical elements in the design process or insufficient design tools. Key goals of the GRC are to improve design approaches and analysis tools and to recommend practices and test methods resulting in improved design standards for wind turbine gearboxes that lower the cost of energy (COE) through improved reliability. The GRC uses a combined gearbox testing, modeling and analysis approach, along with a database of information from gearbox failures collected from overhauls and investigation of gearbox condition monitoring techniques to improve wind turbine operations and maintenance practices. Testing of Gearbox 2 (GB2) using the two-speed turbine controller that has been used in prior testing. This test series will investigate non-torque loads, high-speed shaft misalignment, and reproduction of field conditions in the dynamometer. This test series will also include vibration testing using an eddy-current brake on the gearbox's high speed shaft.

  4. Georgetown University generic integrated community energy system GU-ICES demonstration project. Modified work management plan. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-04-01

    This Phase II Modified Work Management Plan reflects the change from a Coal Using ICES to a Generic ICES Program. As such, it retains the essential elements relating to coal while broadening the number and types of alternative energy subsystems to be evaluated for eventual implementation on the Georgetown University Campus. In addition to the plan in Book I, Book II deals with an energy audit conducted at the campus in the fall of 1978 to establish a gross baseline from which to measure and evaluate the contributions of selected alternative energy subsystems both from an energy and cost standpoint. Book I proceeds from a discussion of an ICES through an explanation of the scope of effort in each phase expanded into detailed task descriptions by phase together with schedules, PERT and GANTT charts, milestones and levels of effort by task for the Feasibility Analysis, and schedules for the overall program. A description of examples of alternative subsystems to be considered is also included. A detailed Management Plan for the conduct of the effort by General Electric completes the plan. Appendices related to cogeneration, life-cycle costing, GE energy subsystems, the GU Master Energy Plan, and typical regulatory processes to be encountered are included. Book II treats the Energy Audit under the three committed task areas of System Description, Analysis and Survey, and Criteria for Energy Usage. The five major energy systems utilized at Georgetown are considered: electrical, chilled water, steam, gas and fuel oil, and city water. A top level analysis yields significant results and recommendations for further action with respect to a detailed measurements program, particularly of steam and electric power usage, over a one year period.

  5. Advanced industrial gas turbine technology readiness demonstration program. Phase II. Final report: compressor rig fabrication assembly and test

    Energy Technology Data Exchange (ETDEWEB)

    Schweitzer, J. K.; Smith, J. D.

    1981-03-01

    The results of a component technology demonstration program to fabricate, assemble and test an advanced axial/centrifugal compressor are presented. This work was conducted to demonstrate the utilization of advanced aircraft gas turbine cooling and high pressure compressor technology to improve the performance and reliability of future industrial gas turbines. Specific objectives of the compressor component testing were to demonstrate 18:1 pressure ratio on a single spool at 90% polytropic efficiency with 80% fewer airfoils as compared to current industrial gas turbine compressors. The compressor design configuration utilizes low aspect ratio/highly-loaded axial compressor blading combined with a centrifugal backend stage to achieve the 18:1 design pressure ratio in only 7 stages and 281 axial compressor airfoils. Initial testing of the compressor test rig was conducted with a vaneless centrifugal stage diffuser to allow documentation of the axial compressor performance. Peak design speed axial compressor performance demonstrated was 91.8% polytropic efficiency at 6.5:1 pressure ratio. Subsequent documentation of the combined axial/centrifugal performance with a centrifugal stage pipe diffuser resulted in the demonstration of 91.5% polytropic efficiency and 14% stall margin at the 18:1 overall compressor design pressure ratio. The demonstrated performance not only exceeded the contract performance goals, but also represents the highest known demonstrated compressor performance in this pressure ratio and flow class. The performance demonstrated is particularly significant in that it was accomplished at airfoil loading levels approximately 15% higher than that of current production engine compressor designs. The test results provide conclusive verification of the advanced low aspect ratio axial compressor and centrifugal stage technologies utilized.

  6. Evaluating and planning the radioactive waste options for dismantling the Tokamak Fusion Test Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Rule, K.; Scott, J.; Larson, S. [Princeton Plasma Physics Lab., NJ (United States)] [and others

    1995-12-31

    The Tokamak Fusion Test Reactor (TFTR) is a one-of-a kind tritium fusion research reactor, and is planned to be decommissioned within the next several years. This is the largest fusion reactor in the world and as a result of deuterium-tritum reactions is tritium contaminated and activated from 14 Mev neutrons. This presents many unusual challenges when dismantling, packaging and disposing its components and ancillary systems. Special containers are being designed to accommodate the vacuum vessel, neutral beams, and tritium delivery and processing systems. A team of experienced professionals performed a detailed field study to evaluate the requirements and appropriate methods for packaging the radioactive materials. This team focused on several current and innovative methods for waste minimization that provides the oppurtunmost cost effective manner to package and dispose of the waste. This study also produces a functional time-phased schedule which conjoins the waste volume, weight, costs and container requirements with the detailed project activity schedule for the entire project scope. This study and project will be the first demonstration of the decommissioning of a tritium fusion test reactor. The radioactive waste disposal aspects of this project are instrumental in demonstrating the viability of a fusion power reactor with regard to its environmental impact and ultimate success.

  7. Single-shell tank riser resistance to ground test plan

    Energy Technology Data Exchange (ETDEWEB)

    Kiewert, L.R.

    1996-03-11

    This Test Procedure provides the general directions for conducting Single-Shell Tank Riser to Earth Measurements which will be used by engineering as a step towards providing closure for the Lightning Hazard Issue.

  8. Isotope Brayton ground demonstration testing and flight qualification. Volume 1. Technical program

    Energy Technology Data Exchange (ETDEWEB)

    1974-12-09

    A program is proposed for the ground demonstration, development, and flight qualification of a radioisotope nuclear heated dynamic power system for use on space missions beginning in the 1980's. This type of electrical power system is based upon and combines two aerospace technologies currently under intense development; namely, the MHW isotope heat source and the closed Brayton cycle gas turbine. This power system represents the next generation of reliable, efficient economic electrical power equipment for space, and will be capable of providing 0.5 to 2.0 kW of electric power to a wide variety of spacecraft for earth orbital and interplanetary missions. The immediate design will be based upon the requirements for the Air Force SURVSATCOM mission. The proposal is presented in three volumes plus an Executive Summary. This volume describes the tasks in the technical program.

  9. PDCI Wide-Area Damping Control: PSLF Simulations of the 2016 Open and Closed Loop Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Wilches Bernal, Felipe [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Pierre, Brian Joseph [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Elliott, Ryan Thomas [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Schoenwald, David A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Byrne, Raymond H. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Neely, Jason C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Trudnowski, Daniel J. [Montana Tech of the Univ. of Montana, Butte, MT (United States); Donnelly, Matthew K. [Montana Tech of the Univ. of Montana, Butte, MT (United States)

    2017-03-01

    To demonstrate and validate the performance of the wide-are a damping control system, the project plans to conduct closed-loop tests on the PDCI in summer/fall 2016. A test plan details the open and closed loop tests to be conducted on the P DCI using the wide-area damping control system. To ensure the appropriate level of preparedness, simulations were performed in order to predict and evaluate any possible unsafe operations before hardware experiments are attempted. This report contains the result s from these simulations using the power system dynamics software PSLF (Power System Load Flow, trademark of GE). The simulations use the WECC (Western Electricity Coordinating Council) 2016 light summer and heavy summer base cases.

  10. Research, development and demonstration plan for radioactive wastes management 2004-2009; Plan de investigacion, desarrollo tecnologico y demostracion para la gestion de residuos radiactivos 2004-2009

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The management of radioactive wastes requires the scientific and technological support that may be provided by R and D. R and D is a key activity as regards both the optimisation and improvement of the solutions implemented for the management of low and intermediate level wastes (LILW), the dismantling of nuclear facilities and environmental restoration and for the selection and support of options for the long-term management of high level wastes (HLW). Since its creation in 1986, Enresa has been carrying out R and D through five-year plans, the most recent of which (4th) covers the period 1999-2003. This revised plan, for the period 2004-2009, arises as a continuation of those activities, on the basis both of the technological level achieved and strategic management needs for this period, as expressed in the General Radioactive Waste Plan, and scientific and industrial development at international level. The document, which is organised in two parts - A and B-, aims to be self-explanatory such that no other ENRESA document need to be consulted for it to be understood. Part A describes in simple terms the characteristics of radioactive wastes and the basic principles applied in their management, as well as the R and D activities performed to date. These are used as a basis for the establishment of objectives for the period 2004- 2009 (strategic, technological and international) and of the criteria included in the plan for the selection and prioritisation of activities. Briefly described, in keeping with the objectives and criteria, are the areas and lines of research for the period 2004- 2009, this being complemented by descriptive tables referring to the objectives and activities associated with these lines. Part A also includes chapters dealing with financing and management methodologies for development and tracking of the Plan. Continuing with the structure of Areas and Lines of research described in Part A, Part B deals in greater depth with the scientific and

  11. Beta Test Plan for Advanced Inverters Interconnecting Distributed Resources with Electric Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    Hoke, A.; Chakraborty, S.; Basso, T.; Coddington, M.

    2014-01-01

    This document provides a preliminary (beta) test plan for grid interconnection systems of advanced inverter-based DERs. It follows the format and methodology/approach established by IEEE Std 1547.1, while incorporating: 1. Upgraded tests for responses to abnormal voltage and frequency, and also including ride-through. 2. A newly developed test for voltage regulation, including dynamic response testing. 3. Modified tests for unintentional islanding, open phase, and harmonics to include testing with the advanced voltage and frequency response functions enabled. Two advanced inverters, one single-phase and one three-phase, were tested under the beta test plan. These tests confirmed the importance of including tests for inverter dynamic response, which varies widely from one inverter to the next.

  12. Plans for an ERL Test Facility at CERN

    Energy Technology Data Exchange (ETDEWEB)

    Jensen, Erik [CERN; Bruning, O S [CERN; Calaga, Buchi Rama Rao [CERN; Schirm, Karl-Martin [CERN; Torres-Sanchez, R [CERN; Valloni, Alessandra [CERN; Aulenbacher, Kurt [Mainz; Bogacz, Slawomir [JLAB; Hutton, Andrew [JLAB; Klein, M [University of Liverpool

    2014-12-01

    The baseline electron accelerator for LHeC and one option for FCC-he is an Energy Recovery Linac. To prepare and study the necessary key technologies, CERNhas started – in collaboration with JLAB and Mainz University – the conceptual design of an ERL Test Facility (ERL-TF). Staged construction will allow the study under different conditions with up to 3 passes, beam energies of up to about 1 GeV and currents of up to 50 mA. The design and development of superconducting cavity modules, including coupler and HOM damper designs, are also of central importance for other existing and future accelerators and their tests are at the heart of the current ERL-TF goals. However, the ERL-TF could also provide a unique infrastructure for several applications that go beyond developing and testing the ERL technology at CERN. In addition to experimental studies of beam dynamics, operational and reliability issues in an ERL, it could equally serve for quench tests of superconducting magnets, as physics experimental facility on its own right or as test stand for detector developments. This contribution will describe the goals and the concept of the facility and the status of the R&D.

  13. Solar wind stream evolution at large heliocentric distances - Experimental demonstration and the test of a model

    Science.gov (United States)

    Gosling, J. T.; Hundhausen, A. J.; Bame, S. J.

    1976-01-01

    A stream propagation model which neglects all dissipation effects except those occurring at shock interfaces, was used to compare Pioneer-10 solar wind speed observations, during the time when Pioneer 10, the earth, and the sun were coaligned, with near-earth Imp-7 observations of the solar wind structure, and with the theoretical predictions of the solar wind structure at Pioneer 10 derived from the Imp-7 measurements, using the model. The comparison provides a graphic illustration of the phenomenon of stream steepening in the solar wind with the attendant formation of forward-reverse shock pairs and the gradual decay of stream amplitudes with increasing heliocentric distance. The comparison also provides a qualitative test of the stream propagation model.

  14. Test plan and report for maxi-drill model 3030 foot-clamp

    Energy Technology Data Exchange (ETDEWEB)

    BOGER, R.M.

    1999-06-24

    This test plan and report defines the testing performed to determine whether the MAXIDRILL Model 3030 Footclamp meets the needs of RMCS operations. This document reports the outcome of the test pesformed. The new footclamp will enhance the safety of RMCS operations.

  15. Development of a Beam-based Phase Feedforward Demonstration at the CLIC Test Facility (CTF3)

    CERN Document Server

    AUTHOR|(CDS)2083344; Christian, Glenn

    The Compact Linear Collider (CLIC) is a proposal for a future linear electron--positron collider that could achieve collision energies of up to 3~TeV. In the CLIC concept the main high energy beam is accelerated using RF power extracted from a high intensity drive beam, achieving an accelerating gradient of 100~MV/m. This scheme places strict tolerances on the drive beam phase stability, which must be better than $0.2^\\circ$ at 12~GHz. To achieve the required phase stability CLIC proposes a high bandwidth (${>}17.5$~MHz), low latency drive beam ``phase feedforward'' (PFF) system. In this system electromagnetic kickers, powered by 500~kW amplifiers, are installed in a chicane and used to correct the phase by deflecting the beam on to longer or shorter trajectories. A prototype PFF system has been installed at the CLIC Test Facility, CTF3; the design, operation and commissioning of which is the focus of this work. Two kickers have been installed in the pre-existing chicane in the TL2 transfer line at CTF3 for t...

  16. Prototypical Rod Consolidation Demonstration Project. Phase 3, Final report: Volume 1, Cold checkout test report, Book 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 2 discusses the following topics: Fuel Rod Extraction System Test Results and Analysis Reports and Clamping Table Test Results and Analysis Reports.

  17. Using the Integrated Vehicle Health Management Research Test and Integration Plan Wiki to Identify Synergistic Test Opportunities

    Science.gov (United States)

    Koelfgen, Syri J.; Faber, James J.

    2010-01-01

    The National Aeronautics and Space Administration (NASA) and the aviation industry have recognized a need for developing a method to identify and combine resources to carry out research and testing more efficiently. The Integrated Vehicle Health Management (IVHM) Research Test and Integration Plan (RTIP) Wiki is a tool that is used to visualize, plan, and accomplish collaborative research and testing. Synergistic test opportunities are developed using the RTIP Wiki, and include potential common resource testing that combines assets and personnel from NASA, industry, academia, and other government agencies. A research scenario is linked to the appropriate IVHM milestones and resources detailed in the wiki, reviewed by the research team members, and integrated into a collaborative test strategy. The scenario is then implemented by creating a test plan when appropriate and the research is performed. The benefits of performing collaborative research and testing are achieving higher Technology Readiness Level (TRL) test opportunities with little or no additional cost, improved quality of research, and increased communication among researchers. In addition to a description of the method of creating these joint research scenarios, examples of the successful development and implementation of cooperative research using the IVHM RTIP Wiki are given.

  18. Cold pressor test demonstrates residual sympathetic cardiovascular activation in familial dysautonomia.

    Science.gov (United States)

    Hilz, M J; Axelrod, F B; Braeske, K; Stemper, B

    2002-04-15

    In familial dysautonomia (FD), i.e. Riley-Day-syndrome, sympathetic cardiovascular function, as well as afferent temperature and pain mediating neurons, are significantly reduced. Thus, it was questioned if cold pressor test (CPT), which normally enhances sympathetic outflow and induces peripheral vasoconstriction by the activation of thermo- and nociceptive system activation, could be used to assess sympathetic function in FD. To evaluate whether CPT can be used to assess sympathetic activation in FD, we performed CPT in 15 FD patients and 18 controls. After a 35-min resting period, participants immersed their right hand and arm up to the elbow into 0-1 degrees C cold water while we monitored heart rate (HR), respiration, beat-to-beat radial artery blood pressure (BP), and laser Doppler skin blood flow (SBF) at the right index finger pulp. From these measurements, heart rate variability parameters were calculated: root mean square of successive differences (RMSSD), coefficient of variation (CV), low and high frequency (LF, HF) power spectra of the electrocardiogram (ECG). All participants perceived cold stimulation and indicated discomfort. In controls, SBF decreased and HR and BP increased rapidly upon CPT. After 60 s, SBF indicated secondary vasodilatation in six controls, BP rise attenuated and HR returned to baseline in all controls. In the patients, SBF remained unchanged, HR and BP increased significantly, but after 50-60 s of CPT and changes were lower than in controls (p<0.05). RMSSD and CV decreased and LF increased significantly only in the controls. We conclude that CPT activates sympathetic HR and BP modulation despite impaired pain and temperature perception in FD patients. BP increase in the presence of almost unchanged SBF might be due to HR increase and to nociceptive arousal and emotionally induced catecholamine release as seen in emotional crises of FD patients. CPT assesses sympathetic cardiovascular responses independently from baroreflex

  19. FIELD IMPLEMENTATION PLAN FOR A WILLISTON BASIN BRINE EXTRACTION AND STORAGE TEST

    Energy Technology Data Exchange (ETDEWEB)

    Hamling, John; Klapperich, Ryan; Stepan, Daniel; Sorensen, James; Pekot, Lawrence; Peck, Wesley; Jacobson, Lonny; Bosshart, Nicholas; Hurley, John; Wilson, William; Kurz, Marc; Burnison, Shaughn; Salako, Olarinre; Musich, Mark; Botnen, Barry; Kalenze, Nicholas; Ayash, Scott; Ge, Jun; Jiang, Tao; Dalkhaa, Chantsalmaa; Oster, Benjamin; Peterson, Kyle; Feole, Ian; Gorecki, Charles; Steadman, Edward

    2016-03-31

    The Energy & Environmental Research Center (EERC) successfully completed all technical work of Phase I, including development of a field implementation plan (FIP) for a brine extraction and storage test (BEST) in the North Dakota portion of the Williston Basin. This implementation plan was commissioned by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) as a proxy for managing formation pressure plumes and measuring/monitoring the movement of differential pressure and CO2 plumes in the subsurface for future saline CO2 storage projects. BEST comprises the demonstration and validation of active reservoir management (ARM) strategies and extracted brine treatment technologies. Two prospective commercial brine injection sites were evaluated for BEST to satisfy DOE’s goals. Ultimately, an active saltwater disposal (SWD) site, Johnsons Corner, was selected because it possesses an ideal combination of key factors making it uniquely suited to host BEST. This site is located in western North Dakota and operated by Nuverra Environmental Solutions (Nuverra), a national leader in brine handling, treatment, and injection. An integrated management approach was used to incorporate local and regional geologic characterization activities with geologic and simulation models, inform a monitoring, verification, and accounting (MVA) plan, and to conduct a risk assessment. This approach was used to design a FIP for an ARM schema and an extracted brine treatment technology test bed facility. The FIP leverages an existing pressure plume generated by two commercial SWD wells. These wells, in conjunction with a new brine extraction well, will be used to conduct the ARM schema. Results of these tests will be quantified based on their impact on the performance of the existing SWD wells and the surrounding reservoir system. Extracted brine will be injected into an underlying deep saline formation through a new injection well. The locations of proposed

  20. Toward adaptive stereotactic robotic brachytherapy for prostate cancer: demonstration of an adaptive workflow incorporating inverse planning and an MR stealth robot.

    Science.gov (United States)

    Cunha, J Adam; Hsu, I-Chow; Pouliot, Jean; Roach Iii, Mack; Shinohara, Katsuto; Kurhanewicz, John; Reed, Galen; Stoianovici, Dan

    2010-08-01

    To translate any robot into a clinical environment, it is critical that the robot can seamlessly integrate with all the technology of a modern clinic. MRBot, an MR-stealth brachytherapy delivery device, was used in a closed-bore 3T MRI and a clinical brachytherapy cone beam CT suite. Targets included ceramic dummy seeds, MR-Spectroscopy-sensitive metabolite, and a prostate phantom. Acquired DICOM images were exported to planning software to register the robot coordinates in the imager's frame, contour and verify target locations, create dose plans, and export needle and seed positions to the robot. The coordination of each system element (imaging device, brachytherapy planning system, robot control, robot) was validated with a seed delivery accuracy of within 2 mm in both a phantom and soft tissue. An adaptive workflow was demonstrated by acquiring images after needle insertion and prior to seed deposition. This allows for adjustment if the needle is in the wrong position. Inverse planning (IPSA) was used to generate a seed placement plan and coordinates for ten needles and 29 seeds were transferred to the robot. After every two needles placed, an image was acquired. The placed seeds were identified and validated prior to placing the seeds in the next two needles. The ability to robotically deliver seeds to locations determined by IPSA and the ability of the system to incorporate novel needle patterns were demonstrated. Shown here is the ability to overcome this critical step. An adaptive brachytherapy workflow is demonstrated which integrates a clinical anatomy-based seed location optimization engine and a robotic brachytherapy device. Demonstration of this workflow is a key element of a successful translation to the clinic of the MRI stealth robotic delivery system, MRBot.

  1. 40 CFR 63.1571 - How and when do I conduct a performance test or other initial compliance demonstration?

    Science.gov (United States)

    2010-07-01

    ... practice standard where initial compliance is not demonstrated using a performance test, opacity... practices at the process unit, and provided EPA methods or approved alternatives were used; (2) You may use... the option in paragraph (a)(1)(iii) in § 63.1564 (Ni lb/hr), and you use continuous parameter...

  2. Milestone Report - Complete New Adsorbent Materials for Marine Testing to Demonstrate 4.5 g-U/kg Adsorbent

    Energy Technology Data Exchange (ETDEWEB)

    Janke, Christopher James [ORNL; Das, Sadananda [ORNL; Oyola, Yatsandra [ORNL; Mayes, Richard T. [ORNL; Saito, Tomonori [ORNL; Brown, Suree [ORNL; Gill, Gary [PNNL; Kuo, Li-Jung [PNNL; Wood, Jordana [PNNL

    2014-08-01

    This report describes work on the successful completion of Milestone M2FT-14OR03100115 (8/20/2014) entitled, “Complete new adsorbent materials for marine testing to demonstrate 4.5 g-U/kg adsorbent”. This effort is part of the Seawater Uranium Recovery Program, sponsored by the U.S. Department of Energy, Office of Nuclear Energy, and involved the development of new adsorbent materials at the Oak Ridge National Laboratory (ORNL) and marine testing at the Pacific Northwest National Laboratory (PNNL). ORNL has recently developed two new families of fiber adsorbents that have demonstrated uranium adsorption capacities greater than 4.5 g-U/kg adsorbent after marine testing at PNNL. One adsorbent was synthesized by radiation-induced graft polymerization of itaconic acid and acrylonitrile onto high surface area polyethylene fibers followed by amidoximation and base conditioning. This fiber showed a capacity of 4.6 g-U/kg adsorbent in marine testing at PNNL. The second adsorbent was prepared by atom-transfer radical polymerization of t-butyl acrylate and acrylonitrile onto halide-functionalized round fibers followed by amidoximation and base hydrolysis. This fiber demonstrated uranium adsorption capacity of 5.4 g-U/kg adsorbent in marine testing at PNNL.

  3. Environmental measurement-while-drilling-gamma ray spectrometer (EMWD-GRS) system technology demonstration plan for use at the Savannah River Site F-Area Retention Basin

    Energy Technology Data Exchange (ETDEWEB)

    Williams, C.V.; Lockwood, G.J.; Normann, R.A. [Sandia National Labs., Albuquerque, NM (United States); Gruebel, R.D. [Tech Reps, Inc., Albuquerque, NM (United States)

    1996-08-01

    The Environmental Measurement-While-Drilling-Gamma Ray Spectrometer (EMWD-GRS) system represents an innovative blend of new and existing technology that provides the capability of producing real-time environmental and drillbit data during drilling operations. This demonstration plan presents information on the EMWD-GRS technology, demonstration design, Cs-137 contamination at the Savannah River Site F-Area Retention Basin, responsibilities of demonstration participants, and the policies and procedures for the demonstration to be conducted at the Savannah River Site F-Area Retention Basin. The EMWD-GRS technology demonstration will consist of continuously monitoring for gamma-radiation contamination while drilling two horizontal boreholes below the backfilled retention basin. These boreholes will pass near previously sampled vertical borehole locations where concentrations of contaminant levels are known. Contaminant levels continuously recorded by the EMWD-GRS system during drilling will be compared to contaminant levels previously determined through quantitative laboratory analysis of soil samples.

  4. Prototypical Rod Consolidation Demonstration Project. Phase 3, Final report: Volume 1, Cold checkout test report, Book 4

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 4 discusses the following topics: Rod Compaction/Loading System Test Results and Analysis Report; Waste Collection System Test Results and Analysis Report; Waste Container Transfer Fixture Test Results and Analysis Report; Staging and Cutting Table Test Results and Analysis Report; and Upper Cutting System Test Results and Analysis Report.

  5. Closure Plan for the Area 3 Radioactive Waste Management Site at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2007-09-01

    The Area 3 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec) for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the interim closure plan for the Area 3 RWMS, which was presented in the Integrated Closure and Monitoring Plan (ICMP) (DOE, 2005). The format and content of this plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). The major updates to the plan include a new closure date, updated closure inventory, the new institutional control policy, and the Title II engineering cover design. The plan identifies the assumptions and regulatory requirements, describes the disposal sites and the physical environment in which they are located, presents the design of the closure cover, and defines the approach and schedule for both closing and monitoring the site. The Area 3 RWMS accepts low-level waste (LLW) from across the DOE Complex in compliance with the NTS Waste Acceptance Criteria (NNSA/NSO, 2006). The Area 3 RWMS accepts both packaged and unpackaged unclassified bulk LLW for disposal in subsidence craters that resulted from deep underground tests of nuclear devices in the early 1960s. The Area 3 RWMS covers 48 hectares (119 acres) and comprises seven subsidence craters--U-3ax, U-3bl, U-3ah, U-3at, U-3bh, U-3az, and U-3bg. The area between craters U-3ax and U-3bl was excavated to form one large disposal unit (U-3ax/bl); the area between craters U-3ah and U-3at was also excavated to form another large disposal unit (U-3ah/at). Waste unit U-3ax/bl is closed; waste units U-3ah/at and U-3bh are active; and the remaining craters, although currently undeveloped, are available for disposal of waste if required. This plan specifically addresses the closure of the U-3ah/at and the U-3bh LLW units. A final closure

  6. AgRISTARS: Renewable resources inventory. Land information support system implementation plan and schedule. [San Juan National Forest pilot test

    Science.gov (United States)

    Yao, S. S. (Principal Investigator)

    1981-01-01

    The planning and scheduling of the use of remote sensing and computer technology to support the land management planning effort at the national forests level are outlined. The task planning and system capability development were reviewed. A user evaluation is presented along with technological transfer methodology. A land management planning pilot test of the San Juan National Forest is discussed.

  7. Test Plan of the Anticipatory Wirelss Sensor Network for the Critical Energy Infrastructure

    Energy Technology Data Exchange (ETDEWEB)

    Carlos Rentel

    2006-09-01

    The test plan for the performance of the Anticipatory Wireless Sensor Network (A-WSN) is presented. The results of the test campaigns will be obtained after actual measurements are taken in the field with the Wireless Sensor Network developed by The Innovation Center-Eaton Corp., and the Anticipatory algorithms developed by ORNL.

  8. Technology of CCS coal utilization (outline of large-size demonstration test for CCS); CCS tan riyo gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    Konno, K. [Center for Coal Utilization, Japan, Tokyo (Japan); Hironaka, H. [Idemitsu Kosan Co. Ltd., Tokyo (Japan)

    1996-09-01

    The coal cartridge system (CCS) is a series of the total system, in which coal is processed centrally at a supply base for each unit of consumer areas, supplied as pulverized coal in bulk units, and coal ash after combustion is recovered and treated. The system is expected of advantages resulted from the centralized production, elimination of handling troubles, and cleanliness. Following a small scale demonstration test, a large demonstration test for practically usable scale has begun in 1990, and completed in fiscal 1995. This paper introduces the CCS and reports the result of the test. In the large demonstration test, a supply station (with manufacturing capability of 200,000 tons a year) was installed in the Aichi refinery of Idemitsu Kosan Co., Ltd., and systematization on quality design and system technologies has been carried out. Long-term continuous operation for five years was achieved (operation time of the supply facilities was about 19,000 hours) without a failure and accident, to which every elemental technology was evaluated highly, and convenience and reliability of the system was verified. 13 figs., 3 tabs.

  9. Demonstration, testing and evaluation of nonintrusive characterization technologies at operable Unit 2 of Rocky Flats Plant. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    A three-dimensional (3-D), high-resolution (HR) seismic reflection evaluation was conducted at the Rocky Flats Plant (RFP), near Golden, Colorado, to demonstrate the applicability of nonintrusive characterization techniques to detect buried objects, contamination, and geological/hydrological features at RFP. The evaluation was conducted as part of the U.S. Department of Energy`s (DOE) request for demonstration, testing and evaluation (DT&E) of nonintrusive techniques, under DOE Program Research and Development Announcement (PRDA) No. DE-RA05-09OR22000.

  10. Plan and safety analysis on the high power irradiation test program of full length fuel element for Hanaro

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Y.S.; Kim, C.K.; Park, H.D.; Kim, K.H.; Park, J.M.; Lee, D.B.; Kim, J.D.; Ko, Y.M.; Jang, S.J.; Ahn, H.S.; Woo, Y.M.; Kim, E.S.; Kim, H.R.; Chae, H.T.; Lee, C.S

    1999-06-01

    The advanced research reactor fuel development project has been carried out for a localization of HANARO nuclear fuels. The design and fabrication technologies of the localized fuel are almost developed, and the quality assurance procedure and assessment criteria were established. The characteristics of the fuel fabricated in KAERI were investigated through out-pile test. In order to verify the localized fuel performance, irradiation test plan of the developed fuel has been worked out. It consists of 3 stages. The 1st stage is normal power irradiation test and the final burn-up of the test fuel was supposed to be 85 at%. The fuel has been successfully irradiated until now and will be unloaded in June. The 2nd irradiation test will be done to confirm the fuel performance and to get the in-pile data under the high neutron flux level. This test fuel is identical with the 36-element fuel assembly. After the 1st and 2nd irradiation tests are completed with acceptable results, the 3rd irradiation test of final stage will be carried out as a demonstration. In this report, the results of the 1st irradiation test is introduced. Then the objectives, schedule and test condition, the design documents of fuel elements and bundle, the methods of fabrication, out-pile test results, post-irradiation examination scheme, calculation of linear power distribution, and safety analysis results for the 2nd irradiation test bundle are described. (author). 2 refs., 14 tabs., 12 figs.

  11. Economic Reliability Acceptance Sampling Plans from Truncated Life Tests based on the Burr Type XII Percentiles

    Directory of Open Access Journals (Sweden)

    Abdur Razzaque Mughal (Corresponding Author

    2011-09-01

    Full Text Available In this article, economic reliability acceptance sampling plan (ERASP is developed for the Burr type XII distribution when the life test is truncated at pre-specified designed parameters. The minimum termination time is necessary to ensure that the specified life percentile is found under a given producer’s risk. The operating characteristic values of the proposed plan are presented for various parameters. A comparative study of proposedplan and existing plan developed by Lio et al. (2010 is also discussed. The result is illustrated by a real dataset example.

  12. Underground Test Area Activity Communication/Interface Plan, Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene [Navarro, Las Vegas, NV (United States); Rehfeldt, Kenneth [Navarro, Las Vegas, NV (United States)

    2016-10-01

    The purpose of this plan is to provide guidelines for effective communication and interfacing between Underground Test Area (UGTA) Activity participants, including the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) and its contractors. This plan specifically establishes the following: • UGTA mission, vision, and core values • Roles and responsibilities for key personnel • Communication with stakeholders • Guidance in key interface areas • Communication matrix

  13. Acceptance Sampling Plans Based on Truncated Life Tests for Gompertz Distribution

    Directory of Open Access Journals (Sweden)

    Wenhao Gui

    2014-01-01

    Full Text Available An acceptance sampling plan for Gompertz distribution under a truncated life test is developed. For different acceptance numbers, consumer’s confidence levels and values of the ratio of the experimental time to the specified mean lifetime, the minimum sample sizes required to ensure the specified mean lifetime are obtained. The operating characteristic function values and the associated producer’s risks are also presented. An example is provided to illustrate the acceptance sampling plan.

  14. An Empirical Test of the Theory of Planned Behaviour Applied to Contraceptive Use in Rural Uganda

    OpenAIRE

    Kiene, Susan M.; Hopwood, Sarah; Lule, Haruna; Rhoda K Wanyenze

    2013-01-01

    There is a high unmet need for contraceptives in developing countries such as Uganda, with high population growth, where efforts are needed to promote family planning and contraceptive use. Despite this high need, little research has investigated applications of health behaviour change theories to contraceptive use amongst this population. The present study tested the Theory of Planned Behaviour’s ability to predict contraceptive use-related behaviours among postpartum women in rural Uganda. ...

  15. HIV and family planning service integration and voluntary HIV counselling and testing client composition in Ethiopia.

    Science.gov (United States)

    Bradley, H; Bedada, A; Tsui, A; Brahmbhatt, H; Gillespie, D; Kidanu, A

    2008-01-01

    Integrating voluntary HIV counselling and testing (VCT) with family planning and other reproductive health services may be one effective strategy for expanding VCT service delivery in resource poor settings. Using 30,257 VCT client records with linked facility characteristics from Ethiopian non-governmental, non-profit, reproductive health clinics, we constructed multi-level logistic regression models to examine associations between HIV and family planning service integration modality and three outcomes: VCT client composition, client-initiated HIV testing and client HIV status. Associations between facility HIV and family planning integration level and the likelihood of VCT clients being atypical family planning client-types, versus older (at least 25 years old), ever-married women were assessed. Relative to facilities co-locating services in the same compound, those offering family planning and HIV services in the same rooms were 2-13 times more likely to serve atypical family planning client-types than older, ever-married women. Facilities where counsellors jointly offered HIV and family planning services and served many repeat family planning clients were significantly less likely to serve single clients relative to older, married women. Younger, single men and older, married women were most likely to self-initiate HIV testing (78.2 and 80.6% respectively), while the highest HIV prevalence was seen among older, married men and women (20.5 and 34.2% respectively). Compared with facilities offering co-located services, those integrating services at room- and counsellor-levels were 1.9-7.2 times more likely to serve clients initiating HIV testing. These health facilities attract both standard material and child health (MCH) clients, who are at high risk for HIV in these data, and young, single people to VCT. This analysis suggests that client types may be differentially attracted to these facilities depending on service integration modality and other facility

  16. Demonstration of Combined Food and Landscape Waste Composting at Fort Leonard Wood, MO: Fort Leonard Wood Installation Strategic Sustainable Plan

    Science.gov (United States)

    2016-01-01

    university postconsumer food wastes . Compost Science and Utilization 6:75-81. Epstein, E. 1997. The Science of Composting. Lancaster, PA: Technomic...Sustainability Innovations (CASI) ERDC/CERL TR-16-1 January 2016 Demonstration of Combined Food and Landscape Waste Composting at Fort Leonard Wood, MO...amendments and organic fertilizers using simple composting technologies, less than 3% of food wastes are recovered and recycled and the remainder are

  17. Effects of earthquake induced rock shear on containment system integrity. Laboratory testing plan development

    Energy Technology Data Exchange (ETDEWEB)

    Read, Rodney S. (RSRead Consulting Inc. (Canada))

    2011-07-15

    This report describes a laboratory-scale testing program plan to address the issue of earthquake induced rock shear effects on containment system integrity. The document contains a review of relevant literature from SKB covering laboratory testing of bentonite clay buffer material, scaled analogue tests, and the development of related material models to simulate rock shear effects. The proposed testing program includes standard single component tests, new two-component constant volume tests, and new scaled analogue tests. Conceptual drawings of equipment required to undertake these tests are presented along with a schedule of tests. The information in this document is considered sufficient to engage qualified testing facilities, and to guide implementation of laboratory testing of rock shear effects. This document was completed as part of a collaborative agreement between SKB and Nuclear Waste Management Organization (NWMO) in Canada

  18. Planning and Logistics Issues raised by the Individual System Tests during the Installation of the LHC

    CERN Document Server

    Weisz, S; Foraz, K; Rodríguez-Mateos, F

    2006-01-01

    The running of individual system tests has to fit within tight constraints of the LHC installation planning and of CERN's accelerator activity in general. For instance, the short circuit tests of the power converters that are performed in-situ restrict the possibility to work in neighbouring areas; much in the same way, the cold tests of the cryogenic distribution line involve safety access restrictions that are not compatible with the transport and installation of cryo-magnets or interconnect activities in the sector considered. Still, these individual system tests correspond to milestones that are required to insure that we can continue with the installation of machine elements. This paper reviews the conditions required to perform the individual system tests and describe how the general LHC installation planning is organised to allocate periods for these tests.

  19. Preliminary test results from a free-piston Stirling engine technology demonstration program to support advanced radioisotope space power applications

    Science.gov (United States)

    White, Maurice A.; Qiu, Songgang; Augenblick, Jack E.

    2000-01-01

    Free-piston Stirling engines offer a relatively mature, proven, long-life technology that is well-suited for advanced, high-efficiency radioisotope space power systems. Contracts from DOE and NASA are being conducted by Stirling Technology Company (STC) for the purpose of demonstrating the Stirling technology in a configuration and power level that is representative of an eventual space power system. The long-term objective is to develop a power system with an efficiency exceeding 20% that can function with a high degree of reliability for up to 15 years on deep space missions. The current technology demonstration convertors (TDC's) are completing shakedown testing and have recently demonstrated performance levels that are virtually identical to projections made during the preliminary design phase. This paper describes preliminary test results for power output, efficiency, and vibration levels. These early results demonstrate the ability of the free-piston Stirling technology to exceed objectives by approximately quadrupling the efficiency of conventional radioisotope thermoelectric generators (RTG's). .

  20. Contribution to a Danish action plan for development and demonstration of CHP from solid biomass; Oplaeg til en national handlingsplan for udvikling og demonstration indenfor kraftvarme fra fast biomasse

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, Morten Tony

    2011-01-15

    The report is the contribution from the industry to an action plan for development and demonstration of CHP technology for solid biomass. The report aims to serve as inspiration and basis for administrators and applicants of Danish funding schemes for development and demonstration in future tenders. Although Danish-based cogeneration technologies for solid biofuels are advanced compared to the competitors in many areas there is a large need to continuously improve the technology by sustained development and demonstration activities. The aim is to overcome the technological barriers that this project has identified and thus maintain competitiveness. The industry currently has very strong focus on market deployment of especially technologies for cogeneration in small scale (up to 15 MW thermal power) and on the overall economy of these plants. Reference installations that displays many operational hours with a reasonable economy, are crucial for investors. Currently, no companies market commercial plants that have sufficiently low costs to operate under Danish conditions and few do for the conditions found internationally. Thus, from the industry perspective there is still a need for development and demonstration of CHP technology below 15 MW thermal. The analysis does not exclude any technology tracks, but the development and demonstration efforts should lead to improvements in conditions such as availability, efficiencies and operating and maintenance costs. Also technologies for large plants and systems need to be improved with respect to availability and efficiency and reduced operating and maintenance costs. For all technologies, there is a need to develop the use of special solid biofuels that on the one hand may have troublesome characteristics but on the other may help lower operating costs. The Danish-based companies have good opportunities to find support for the development and demonstration effort. A number of support programs and pools are in place and

  1. DEMONSTRATION OF FUEL CELLS TO RECOVER ENERGY FROM LANDFILL GAS - PHASE III. DEMONSTRATION TESTS - PHASE IV. GUIDELINES AND RECOMMENDATIONS- VOLUME 1. TECHNICAL REPORT

    Science.gov (United States)

    The report summarizes the results of a four-phase program to demonstrate that fuel cell energy recovery using a commercial phosphoric acid fuel cell is both environmentally sound and commercially feasible. Phase I, a conceptual design and evaluation study, addressed the technical...

  2. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Irene Farnham

    2011-05-01

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

  3. ACCEPTANCE SAMPLING PLAN BASED ON TRUNCATED LIFE TESTS FOR COMPOUND RAYLEIGH DISTRIBUTION

    Directory of Open Access Journals (Sweden)

    Bhupendra Singh

    2013-12-01

    Full Text Available In this paper,a reliability sampling plan is developed assuming that lifetimes of the test units follow compound Rayleigh distribution and the life test is terminated at a pre-fixed time. This type of sampling plan is used to save the test time in practical situations. The minimum sample size required for ensuringthe specified mean life at specified consumer’s confidence level has been determined. The operating characteristic curve values of the sampling plans are examined with varying ratio of the true mean life to the specified life. The minimum such mean ratios are also obtained to minimize the producer’s risk at the specified level. For illustrative purpose, a numerical example has been discussed.

  4. Developing Items to Measure Theory of Planned Behavior Constructs for Opioid Administration for Children: Pilot Testing.

    Science.gov (United States)

    Vincent, Catherine; Riley, Barth B; Wilkie, Diana J

    2015-12-01

    The Theory of Planned Behavior (TpB) is useful to direct nursing research aimed at behavior change. As proposed in the TpB, individuals' attitudes, perceived norms, and perceived behavior control predict their intentions to perform a behavior and subsequently predict their actual performance of the behavior. Our purpose was to apply Fishbein and Ajzen's guidelines to begin development of a valid and reliable instrument for pediatric nurses' attitudes, perceived norms, perceived behavior control, and intentions to administer PRN opioid analgesics when hospitalized children self-report moderate to severe pain. Following Fishbein and Ajzen's directions, we were able to define the behavior of interest and specify the research population, formulate items for direct measures, elicit salient beliefs shared by our target population and formulate items for indirect measures, and prepare and test our questionnaire. For the pilot testing of internal consistency of measurement items, Cronbach alphas were between 0.60 and 0.90 for all constructs. Test-retest reliability correlations ranged from 0.63 to 0.90. Following Fishbein and Ajzen's guidelines was a feasible and organized approach for instrument development. In these early stages, we demonstrated good reliability for most subscales, showing promise for the instrument and its use in pain management research. Better understanding of the TpB constructs will facilitate the development of interventions targeted toward nurses' attitudes, perceived norms, and/or perceived behavior control to ultimately improve their pain behaviors toward reducing pain for vulnerable children. Copyright © 2015 American Society for Pain Management Nursing. Published by Elsevier Inc. All rights reserved.

  5. A test sheet generating algorithm based on intelligent genetic algorithm and hierarchical planning

    Science.gov (United States)

    Gu, Peipei; Niu, Zhendong; Chen, Xuting; Chen, Wei

    2013-03-01

    In recent years, computer-based testing has become an effective method to evaluate students' overall learning progress so that appropriate guiding strategies can be recommended. Research has been done to develop intelligent test assembling systems which can automatically generate test sheets based on given parameters of test items. A good multisubject test sheet depends on not only the quality of the test items but also the construction of the sheet. Effective and efficient construction of test sheets according to multiple subjects and criteria is a challenging problem. In this paper, a multi-subject test sheet generation problem is formulated and a test sheet generating approach based on intelligent genetic algorithm and hierarchical planning (GAHP) is proposed to tackle this problem. The proposed approach utilizes hierarchical planning to simplify the multi-subject testing problem and adopts genetic algorithm to process the layered criteria, enabling the construction of good test sheets according to multiple test item requirements. Experiments are conducted and the results show that the proposed approach is capable of effectively generating multi-subject test sheets that meet specified requirements and achieve good performance.

  6. Effective use of simple computer programmes and clay models to demonstrate the planning and operative steps for teaching and presentations

    Directory of Open Access Journals (Sweden)

    Rahul Krishnarao Patil

    2016-01-01

    Full Text Available Background: Presenting and demonstrating a surgical procedure in the current era is difficult without good intraoperative pictures and videos. A long, complex, multi-staged surgery is better illustrated by detailed intraoperative images at various stages. Although desirable, it may be difficult due to various reasons. Material and Methods: A simple method of preparing illustrations with pictures/diagrams created on PowerPoint and clay models to recreate the missing links in clinical photographs has been proposed. Results: It is a simple technique with a moderate learning curve. Once familiar with technique, one can effectively use the technique to convey the details in much more clear manner. Conclusion: It is a simple and effective way of communicating through digital images, and gives the audience a 3 dimensional idea about the concept.

  7. Demonstration of anticoagulation patient self-testing feasibility at an Indian Health Service facility: A case series analysis

    Directory of Open Access Journals (Sweden)

    Schupbach RR

    2013-03-01

    Full Text Available Background: Anticoagulation patient self-testing (PST represents an alternative approach to warfarin monitoring by enabling patients to use coagulometers to test their international normalized ratio (INR values. PST offers several advantages that potentially improve warfarin management. Objective: To describe implementation and associated performance of a PST demonstration program at an Indian Health Service (IHS facility. Methods: A non-consecutive case series analysis of patients from a pharmacy-managed PST demonstration program was performed at an IHS facility in Oklahoma between July 2008 and February 2009.Results: Mean time in therapeutic range (TTR for the seven patients showed a small, absolute increase during the twelve weeks of PST compared to the twelve weeks prior to PST. Four of the seven patients had an increase in TTR during the twelve week course of PST compared to their baseline TTR. Three of four patients with increased TTR in the final eight week period of PST achieved a TTR of 100%. Of the three patients who experienced a decrease in TTR after initiating self-testing, two initially presented with a TTR of 100% prior to PST and one patient had a TTR of 100% for the final eight weeks of PST. The two patients not achieving a TTR of 100% during the twelve week PST period demonstrated an increase in TTR following the first four weeks of PST. Conclusion: Although anticoagulation guidelines now emphasize patient self-management (PSM only, optimal PST remains an integral process in PSM delivery. In the patients studied, the results of this analysis suggest that PST at the IHS facility provided a convenient, alternative method for management of chronic warfarin therapy for qualified patients. More than half of the patients demonstrated improvement in TTR. Although there is a learning curve immediately following PST initiation, the mean TTR for the entire PST period increased modestly when compared to the time period prior to PST.

  8. Tracer-Test Planning Using the Efficient Hydrologic Tracer-Test Design (Ehtd) Program (2003)

    Science.gov (United States)

    Hydrological tracer testing is the most reliable diagnostic technique available for establishing flow trajectories and hydrologic connections and for determining basic hydraulic and geometric parameters necessary for establishing operative solute-transport processes. Tracer-test ...

  9. Status and plans for a SRF accelerator test faciliy at Fermilab

    CERN Document Server

    Leibfritz, J; Carlson, K; Chase, B; Church, M; Harms, E; Klebaner, A; Kucera, M; Lackey, S; Martinez, A; Nagaitsev, S; Nobrega, L; Piot, P; Reid, J; Wendt, M; Wesseln, S

    2012-01-01

    A superconducting RF accelerator test facility is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beam lines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating an 810 MeV electron beam with ILC beam intensity. Expansion plans of the facility are underway that will provide the capability to upgrade the accelerator to a total beam energy of 1.5 GeV. In addition to testing accelerator components, this facility will be used to test RF power equipment, instrumentation, LLRF and controls systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

  10. Demonstration of the Military Ecological Risk Assessment Framework (MERAF): Apache Longbow - Hell Missile Test at Yuma Proving Ground

    Energy Technology Data Exchange (ETDEWEB)

    Efroymson, R.A.

    2002-05-09

    This ecological risk assessment for a testing program at Yuma Proving Ground, Arizona, is a demonstration of the Military Ecological Risk Assessment Framework (MERAF; Suter et al. 2001). The demonstration is intended to illustrate how risk assessment guidance concerning-generic military training and testing activities and guidance concerning a specific type of activity (e.g., low-altitude aircraft overflights) may be implemented at a military installation. MERAF was developed with funding from the Strategic Research and Development Program (SERDP) of the Department of Defense. Novel aspects of MERAF include: (1) the assessment of risks from physical stressors using an ecological risk assessment framework, (2) the consideration of contingent or indirect effects of stressors (e.g., population-level effects that are derived from habitat or hydrological changes), (3) the integration of risks associated with different component activities or stressors, (4) the emphasis on quantitative risk estimates and estimates of uncertainty, and (5) the modularity of design, permitting components of the framework to be used in various military risk assessments that include similar activities. The particular subject of this report is the assessment of ecological risks associated with a testing program at Cibola Range of Yuma Proving Ground, Arizona. The program involves an Apache Longbow helicopter firing Hellfire missiles at moving targets, i.e., M60-A1 tanks. Thus, the three component activities of the Apache-Hellfire test were: (1) helicopter overflight, (2) missile firing, and (3) tracked vehicle movement. The demonstration was limited, to two ecological endpoint entities (i.e., potentially susceptible and valued populations or communities): woody desert wash communities and mule deer populations. The core assessment area is composed of about 126 km{sup 2} between the Chocolate and Middle Mountains. The core time of the program is a three-week period, including fourteen days of

  11. Light Water Reactor Sustainability Program Risk Informed Safety Margin Characterization (RISMC) Advanced Test Reactor Demonstration Case Study

    Energy Technology Data Exchange (ETDEWEB)

    Curtis Smith; David Schwieder; Cherie Phelan; Anh Bui; Paul Bayless

    2012-08-01

    Safety is central to the design, licensing, operation, and economics of Nuclear Power Plants (NPPs). Consequently, the ability to better characterize and quantify safety margin holds the key to improved decision making about LWR design, operation, and plant life extension. A systematic approach to characterization of safety margins and the subsequent margins management options represents a vital input to the licensee and regulatory analysis and decision making that will be involved. The purpose of the RISMC Pathway R&D is to support plant decisions for risk-informed margins management with the aim to improve economics, reliability, and sustain safety of current NPPs. Goals of the RISMC Pathway are twofold: (1) Develop and demonstrate a risk-assessment method coupled to safety margin quantification that can be used by NPP decision makers as part of their margin recovery strategies. (2) Create an advanced “RISMC toolkit” that enables more accurate representation of NPP safety margin. This report describes the RISMC methodology demonstration where the Advanced Test Reactor (ATR) was used as a test-bed for purposes of determining safety margins. As part of the demonstration, we describe how both the thermal-hydraulics and probabilistic safety calculations are integrated and used to quantify margin management strategies.

  12. Demonstration Testing of a Thermal Desorption Unit to Receive and Treat Waste with Unlimited Concentration of PCBs - 13437

    Energy Technology Data Exchange (ETDEWEB)

    Orton, Timothy L. [EnergySolutions, 423 West 300 South, Salt Lake City, UT 84101 (United States); Palmer, Carl R. [TD.X Associates LP, 148 South Dowlen Road, PMB 700, Beaumont, TX 77707 (United States)

    2013-07-01

    For the last nine years, EnergySolutions and TD*X Associates LP have teamed up to provide the most comprehensive organic removal treatment process in the radioactive waste industry. The high performance thermal desorption unit (HP-TDU) located at the EnergySolutions Clive facility in Utah has successfully processed over 1,850 tons of organically contaminated radioactive mixed waste. Products from the HP-TDU system include a radioactively contaminated dry solid material that can be disposed in the on-site landfill and an organic condensate with high thermal energy content that is generally below background radiation and capable of free-release to a non-radioactive incinerator. Over the years, Permits and approvals have been obtained through the state of Utah, United States Environmental Protection Agency (USEPA) Region 8, and USEPA headquarters that enable the treatment of several waste categories including volatile and semi-volatile organic compounds, combustion-coded (CMBST) compounds, volatile metals, and polychlorinated biphenyls (PCBs). The unit has recently successfully completed Demonstration Testing for PCB concentrations up to 660,000 ppm (parts per million). Solid processed material from this Demonstration Testing was less than two ppm PCBs in three separate treatment runs; reprocessing or additional treatment was not needed to meet this limit. Through post-demonstration permitting, the system is unlimited in scope as approval has been given to receive and solidify up to pure PCBs down to this processing limit concentration to complete treatment of mixed waste. (authors)

  13. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in this test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are {sup 99}Tc and {sup 60}Co for underwater affected by past discharges to the 216-BY Cribs, and {sup 90}Sr, {sup 239/240}Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes.

  14. Safety demonstration tests on pressure rise in ventilation system and blower integrity of a fuel-reprocessing plant

    Energy Technology Data Exchange (ETDEWEB)

    Takada, Junichi; Suzuki, Motoe; Tsukamoto, Michio; Koike, Tadao; Nishio, Gunji [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1996-12-01

    In JAERI, the demonstration test was carried out as a part of safety researches of the fuel-reprocessing plant using a large-scale facility consist of cells, ducts, dumpers, HEPA filters and a blower, when an explosive burning due to a rapid reaction of thermal decomposition for solvent/nitric acid occurs in a cell of the reprocessing plant. In the demonstration test, pressure response propagating through the facility was measured under a blowing of air from a pressurized tank into the cell in the facility to elucidate an influence of pressure rise in the ventilation system. Consequently, effective pressure decrease in the facility was given by a configuration of cells and ducts in the facility. In the test, transient responses of HEPA filters and the blower by the blowing of air were also measured to confirm the integrity. So that, it is confirmed that HEPA filters and the blower under pressure loading were sufficient to maintain the integrity. The content described in this report will contribute to safety assessment of the ventilation system in the event of explosive burning in the reprocessing plant. (author)

  15. Testing the Recommendations of the Washington State Nutrition and Physical Activity Plan: The Moses Lake Case Study

    Directory of Open Access Journals (Sweden)

    Donna B. Johnson, PhD, RD

    2006-03-01

    Full Text Available Background The Washington State Nutrition and Physical Activity Plan provides a framework in which policy makers can work together to build and support healthy environments for nutrition and physical activity. The city of Moses Lake, Wash, was chosen to serve as a pilot site to test the conceptual approaches and recommendations of the plan and to develop a model for healthy communities elsewhere in the state. Context Moses Lake is an ethnically diverse, geographically isolated town with a population of about 15,000. Methods An advisory committee used data from an inventory of local policies and environments, along with the recommendations from the state plan, to develop a plan for Healthy Communities Moses Lake. Three initiatives were chosen for the first actions: a connected system of trails and paths, enhanced facilities for breastfeeding in the community, and a community garden. Consequences Records of cumulative actions demonstrated that Healthy Communities Moses Lake continued to be an active and productive project. Initial measures of success were collected by each of the three first action teams. Environmental changes will be monitored by comparison with the initial inventory of local policies. Long-term health outcomes in Moses Lake will be monitored by the Washington State Department of Health.

  16. Test-access planning and test scheduling for embedded core-based system chips

    OpenAIRE

    Goel, Sandeep Kumar

    2005-01-01

    This thesis describes parts of the research work that has been carries out at Philips Research Laboratories, Eindhoven, related to the development of TR-ARCHITECT. TR-ARCHITECT uses a five step heuristic algorithm to design a test architecture. TR-ARCHITECT designs and optimized test architectures with respect to the required ATE vector memory dept and test-application time. TR-ARCHITECT optimizes wrapper and TAM design in conjunction.

  17. Speech production in people who stutter: Testing the motor plan assembly hypothesis

    NARCIS (Netherlands)

    Lieshout, P.H.H.M. van; Hulstijn, W.; Peters, H.F.M.

    1996-01-01

    The main purpose of the present study was to test the hypothesis that persons who stutter, when compared to persons who do not stutter, are less able to assemble abstract motor plans for short verbal responses. Subjects were adult males who stutter and age- and sex-matched control speakers, who were

  18. Teachers' Preferences for Educational Planning: Dynamic Testing, Teaching Experience and Teachers' Sense of Efficacy

    Science.gov (United States)

    Bosma, Tirza; Hessels, Marco G. P.; Resing, Wilma C. M.

    2012-01-01

    This study surveyed a sample of 188 elementary teachers with respect to their preference for information regarding educational planning, in particular information captured with dynamic testing procedures. The influence of teachers' experience and sense of efficacy on teachers' preferences was also investigated. Results indicated teachers'…

  19. Corrective Action Plan for Corrective Action Unit 424: Area 3 Landfill Complex, Tonopah Test Range, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1998-08-31

    This corrective action plan provides the closure implementation methods for the Area 3 Landfill Complex, Corrective Action Unit (CAU) 424, located at the Tonopah Test Range. The Area 3 Landfill Complex consists of 8 landfill sites, each designated as a separate corrective action site.

  20. An Investigation of L2 Learners' Anxiety and Performance under Planning Time in Oral Test

    Institute of Scientific and Technical Information of China (English)

    金敏

    2015-01-01

    Previous research has shown that the effect of planning time in second language can trigger the anxiety of the speaker. In this study, time is manipulated as an important variable in a final Oral English Test for students of College English. Discourse analytic techniques and SPSS software are used to classify and process the data collected.

  1. Test-access planning and test scheduling for embedded core-based system chips

    NARCIS (Netherlands)

    Goel, Sandeep Kumar

    2005-01-01

    This thesis describes parts of the research work that has been carries out at Philips Research Laboratories, Eindhoven, related to the development of TR-ARCHITECT. TR-ARCHITECT uses a five step heuristic algorithm to design a test architecture. TR-ARCHITECT designs and optimized test architectures w

  2. Optimal Design of Multiple Stresses Accelerated Life Test Plan Based on Transforming the Multiple Stresses to Single Stress

    Institute of Scientific and Technical Information of China (English)

    GAO Liang; CHEN Wenhua; QIAN Ping; PAN Jun; HE Qingchuan

    2014-01-01

    For planning optimum multiple stresses accelerated life test plans, a commonly followed guiding principle is that all parameters of the life-stress relationship should be estimated, and the number of the stress level combinations must be no less than the number of parameters of the life-stress relationship. However, the general objective of an accelerated life test(ALT) is to assess thep-th quantile of the product life distribution under normal stress. For this objective,estimating all model parameters is not necessary, and this will increase the cost of test. Based on the theoretical conclusion that the stress level combinations of the optimum multiple stresses ALT plan locate on a straight line through the origin of coordinate, it is proposed that a design idea of planning the optimum multiple stresses ALT plan through transforming the problem of designing an optimum multiple stresses ALT plan to designing an optimum single stress ALT plan. Moreover, a method of planning the optimum multiple stresses ALT plan which can avoid estimating all model parameters is established. An example shows that, the proposed plan which only has two stress level combinations could achieve an accuracy no less than the traditional plan, and save the test time and cost on one stress level combination at least; when the actual product life is less than the design value, even the deviation of the model initial parameters value is up to 20%, the variance of the estimation of thep-th quantile of the proposed plan is still smaller than the traditional plans approximately 25%. A design method is provided for planning the optimum multiple stresses ALT which uses the statistical optimum degenerate test plan as the optimum multiple stresses accelerated life test plan.

  3. Refractory Metal Heat Pipe Life Test - Test Plan and Standard Operating Procedures

    Science.gov (United States)

    Martin, J. J.; Reid, R. S.

    2010-01-01

    Refractory metal heat pipes developed during this project shall be subjected to various operating conditions to evaluate life-limiting corrosion factors. To accomplish this objective, various parameters shall be investigated, including the effect of temperature and mass fluence on long-term corrosion rate. The test series will begin with a performance test of one module to evaluate its performance and to establish the temperature and power settings for the remaining modules. The performance test will be followed by round-the-clock testing of 16 heat pipes. All heat pipes shall be nondestructively inspected at 6-month intervals. At longer intervals, specific modules will be destructively evaluated. Both the nondestructive and destructive evaluations shall be coordinated with Los Alamos National Laboratory. During the processing, setup, and testing of the heat pipes, standard operating procedures shall be developed. Initial procedures are listed here and, as hardware is developed, will be updated, incorporating findings and lessons learned.

  4. Nuclear fuels technologies: Thermally induced gallium removal system (TIGRS), fiscal year 1998 research and development test plan

    Energy Technology Data Exchange (ETDEWEB)

    Buksa, J.J.; Butt, D.P.; Chidester, K.; DeMuth, S.F.; Havrilla, G.J.; James, C.A.; Kolman, D.G.

    1997-12-24

    This document details the research and development (R and D) activities that will be conducted in Fiscal Year 1998 (FY98) by the Thermally Induced Gallium Removal System (TIGRS) team for the Department of Energy Office of Fissile Materials Disposition. This work is a continuation and extension of experimental activities that have been conducted in support of using weapons-derived plutonium in the fabrication of mixed-oxide (MOX) nuclear fuel for reactor-based plutonium disposition. The ultimate purpose of this work is to demonstrate adequate Thermally Induced Gallium Removal with a prototypic system. This Test Plan presents more than the FY98 R and D efforts in order to frame the Task in its entirety. To achieve the TIGRS Program objectives, R and D activities during the next two years will be focused on (1) process development leading to a prototypic TIGRS design, and (2) prototypic TIGRS design and testing leading to and including a prototypic demonstration of TIGRS operation. Both the process development and system testing efforts will consist of a series of surrogate-based cold tests and plutonium-based hot tests. Some of this testing has already occurred and will continue into FY99.

  5. Global nuclear energy partnership fuels transient testing at the Sandia National Laboratories nuclear facilities : planning and facility infrastructure options.

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, John E.; Wright, Steven Alan; Tikare, Veena; MacLean, Heather J. (Idaho National Laboratory, Idaho Falls, ID); Parma, Edward J., Jr.; Peters, Curtis D.; Vernon, Milton E.; Pickard, Paul S.

    2007-10-01

    The Global Nuclear Energy Partnership fuels development program is currently developing metallic, oxide, and nitride fuel forms as candidate fuels for an Advanced Burner Reactor. The Advance Burner Reactor is being designed to fission actinides efficiently, thereby reducing the long-term storage requirements for spent fuel repositories. Small fuel samples are being fabricated and evaluated with different transuranic loadings and with extensive burnup using the Advanced Test Reactor. During the next several years, numerous fuel samples will be fabricated, evaluated, and tested, with the eventual goal of developing a transmuter fuel database that supports the down selection to the most suitable fuel type. To provide a comparative database of safety margins for the range of potential transmuter fuels, this report describes a plan to conduct a set of early transient tests in the Annular Core Research Reactor at Sandia National Laboratories. The Annular Core Research Reactor is uniquely qualified to perform these types of tests because of its wide range of operating capabilities and large dry central cavity which extents through the center of the core. The goal of the fuels testing program is to demonstrate that the design and fabrication processes are of sufficient quality that the fuel will not fail at its design limit--up to a specified burnup, power density, and operating temperature. Transient testing is required to determine the fuel pin failure thresholds and to demonstrate that adequate fuel failure margins exist during the postulated design basis accidents.

  6. Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2008-09-01

    The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.

  7. Psychometric Testing of the Self-Efficacy for Interdisciplinary Plans of Care Scale.

    Science.gov (United States)

    Molle, Elizabeth; Froman, Robin

    2017-01-01

    Computerized interdisciplinary plans of care have revitalized nurse-centric care plans into dynamic and meaningful electronic documents. To maximize the benefits of these documents, it is important to understand healthcare professionals' attitudes, specifically their confidence, for making computerized interdisciplinary care plans useful and meaningful documents. The purpose of the study was to test the psychometric properties of the Self-Efficacy for Interdisciplinary Plans of Care instrument intended to measure healthcare professionals' self-efficacy for using such documents. Content validity was assessed by an expert review panel. Content validity indices ranged from 0.75 to 1.00, with a scale CVI of 0.94. A sample of 389 healthcare providers completed the 14-item instrument. Principal axis factoring was used to assess factor structure. The exploratory factor analysis yielded a single-factor structure accounting for 71.76% of covariance. Cronbach internal consistency coefficient for the single factor solution was .97. The corrected item-total correlations ranged from 0.71 to 0.90. The coefficient of stability, during a 2-week period, with a subset of the sample (n = 38), was estimated at 0.82. The results of this study suggest that the Self-Efficacy for Interdisciplinary Plans of Care has sturdy reliability and validity for measuring the self-efficacy of healthcare providers to make computerized interdisciplinary plans of care meaningful and useful documents.

  8. Test plan/procedure for the checkout of the USA cable communications test configuration for the electromagnetic compatibility (EMC) tests

    Science.gov (United States)

    Perry, J. C.

    1975-01-01

    A series of electromagnetic compatibility (EMC) tests were conducted in May, 1975 in the Soviet Union. The purpose of the EMC tests was to determine the effects of the operating environment of the Soviet aircraft, Soyuz, upon the electrical performance of the USA's cable communications equipment located in Soyuz. The test procedures necessary to check out the cable communications test configuration in preparation for the EMC tests are presented.

  9. Assessment of the Technical Maturity of Generation IV Concepts for Test or Demonstration Reactor Applications, Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Gougar, Hans David [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-10-01

    The United States Department of Energy (DOE) commissioned a study the suitability of different advanced reactor concepts to support materials irradiations (i.e. a test reactor) or to demonstrate an advanced power plant/fuel cycle concept (demonstration reactor). As part of the study, an assessment of the technical maturity of the individual concepts was undertaken to see which, if any, can support near-term deployment. A Working Group composed of the authors of this document performed the maturity assessment using the Technical Readiness Levels as defined in DOE’s Technology Readiness Guide . One representative design was selected for assessment from of each of the six Generation-IV reactor types: gas-cooled fast reactor (GFR), lead-cooled fast reactor (LFR), molten salt reactor (MSR), supercritical water-cooled reactor (SCWR), sodium-cooled fast reactor (SFR), and very high temperature reactor (VHTR). Background information was obtained from previous detailed evaluations such as the Generation-IV Roadmap but other technical references were also used including consultations with concept proponents and subject matter experts. Outside of Generation IV activity in which the US is a party, non-U.S. experience or data sources were generally not factored into the evaluations as one cannot assume that this data is easily available or of sufficient quality to be used for licensing a US facility. The Working Group established the scope of the assessment (which systems and subsystems needed to be considered), adapted a specific technology readiness scale, and scored each system through discussions designed to achieve internal consistency across concepts. In general, the Working Group sought to determine which of the reactor options have sufficient maturity to serve either the test or demonstration reactor missions.

  10. Office of Technology Development FY 1993 program summary: Office of Research and Development, Office of Demonstration, Testing and Evaluation. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    This report summarizes significant FY93 programmatic information and accomplishments relevant to the individual activities within the Office of Technology Development Program for Research, Development, Demonstration, Testing, and Evaluation (RDDT&E). A brief discussion of the mission of the Office of Environmental Restoration and Waste Management (EM) and the Office of Technology Development is presented. An overview is presented of the major problem areas confronting DOE. These problem areas include: groundwater and soils cleanup; waste retrieval and processing; and pollution prevention. The organizational elements within EM are highlighted. An EM-50 Funding Summary for FY92 and FY93 is also provided. RDDT&E programs are discussed and their key problem areas are summarized. Three salient program-formulating concepts are explained. They are: Integrated Demonstrations, Integrated Programs, and the technology window of opportunity. Detailed information for each of the programs within RDDT&E is presented and includes a fact sheet, a list of technical task plans and an accomplishments and objectives section.

  11. An empirical test of the Theory of Planned Behaviour applied to contraceptive use in rural Uganda.

    Science.gov (United States)

    Kiene, Susan M; Hopwood, Sarah; Lule, Haruna; Wanyenze, Rhoda K

    2014-12-01

    There is a high unmet need for contraceptives in developing countries such as Uganda, with high population growth, where efforts are needed to promote family planning and contraceptive use. Despite this high need, little research has investigated applications of health-behaviour-change theories to contraceptive use among this population. This study tested the Theory of Planned Behaviour's ability to predict contraceptive-use-related behaviours among post-partum women in rural Uganda. Results gave modest support to the theory's application and suggest an urgent need for improved theory-based interventions to promote contraceptive use in the populations of developing countries. © The Author(s) 2013.

  12. Planning failure-censored constant-stress par tially accelerated life test

    Institute of Scientific and Technical Information of China (English)

    Ali A Ismail; Abdulhakim A Al-Babtain

    2015-01-01

    This article deals with the case of the failure-censored constant-stress partial y accelerated life test (CSPALT) for highly reliable materials or products assuming the Pareto distribution of the second kind. The maximum likelihood (ML) method is used to estimate the parameters of the CSPALT model. The performance of ML estimators is investigated via their mean square error. Also, the average confidence interval length (IL) and the associated co-verage probability (CP) are obtained. Moreover, optimum CSPALT plans that determine the optimal proportion of the test units al-located to each stress are developed. Such optimum test plans minimize the generalized asymptotic variance (GAV) of the ML estimators of the model parameters. For il ustration, Monte Carlo simulation studies are given and a real life example is provided.

  13. Creating a testing field where delta technology and water innovations are tested and demonstrated with the help of citizen science methods

    Science.gov (United States)

    de Vries, Sandra; Rutten, Martine; de Vries, Liselotte; Anema, Kim; Klop, Tanja; Kaspersma, Judith

    2017-04-01

    In highly populated deltas, much work is to be done. Complex problems ask for new and knowledge driven solutions. Innovations in delta technology and water can bring relief to managing the water rich urban areas. Testing fields form a fundamental part of the knowledge valorisation for such innovations. In such testing fields, product development by start-ups is coupled with researchers, thus supplying new scientific insights. With the help of tests, demonstrations and large-scale applications by the end-users, these innovations find their way to the daily practices of delta management. More and more cities embrace the concept of Smart Cities to tackle the ongoing complexity of urban problems and to manage the city's assets - such as its water supply networks and other water management infrastructure. Through the use of new technologies and innovative systems, data are collected from and with citizens and devices - then processed and analysed. The information and knowledge gathered are keys to enabling a better quality of life. By testing water innovations together with citizens in order to find solutions for water management problems, not only highly spatial amounts of data are provided by and/or about these innovations, they are also improved and demonstrated to the public. A consortium consisting of a water authority, a science centre, a valorisation program and two universities have joined forces to create a testing field for delta technology and water innovations using citizen science methods. In this testing field, the use of citizen science for water technologies is researched and validated by facilitating pilot projects. In these projects, researchers, start-ups and citizens work together to find the answer to present-day water management problems. The above mentioned testing field tests the use of crowd-sourcing data as for example hydrological model inputs, or to validate remote sensing applications, or improve water management decisions. Currently the

  14. Experimental test plan: USDOE/JAERI collaborative program for the coated particle fuel performance test

    Energy Technology Data Exchange (ETDEWEB)

    Kania, M.J. [Oak Ridge National Lab., TN (United States); Fukuda, K. [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1989-12-01

    This document describes the coated-particle fuel performance test agreed to under Annex 2 of the arrangement between the US Department of Energy and the Japan Atomic Energy Research Institute on cooperation in research and development regarding high-temperature gas-cooled reactors (HTGRs). The test will evaluate the behavior of reference fuel compacts containing coated-particle fuels fabricated according to the specifications for the US Modular HTGR and the Japanese High-Temperature Engineering Test Reactor (HTTR) concepts. Two experimental capsules, HRB-21 and HRB-22, are being tested. Capsule HRB-21 contains only US reference fuel, and HRB-22 contains only JAERI reference fuel. Both capsules will be irradiated in the High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL). Capsule HRB-21 will be operated at a mean volumetric fuel temperature of 975{degrees}C and will achieve a peak fissile burnup of 26% fissions per initial metal atom (FIMA) and a fast fluence of {le}4.5 {times} 10{sup 25} neutrons/m{sup 2}. Capsule HRB-22 will be operated at a mean centerline fuel temperature of 1250 to 1300{degrees}C and will achieve a peak fissile burnup of 5.5% FIMA and a fast fluence of 1.7 {times} 10{sup 25} neutrons/m{sup 2}. Performance of the fuels during irradiation will be closely monitored using on-line fission gas surveillance. Following irradiation, both capsules will undergo detailed examinations and core heatup simulation testing. Results from in-reactor monitoring and postirradiation testing will be analyzed to comparatively assess US and Japanese coated-particle fuel performance. 3 refs., 9 figs., 10 tabs.

  15. Numerical simulation supports formation testing planning; Simulacao numerica auxilia planejamento de teste de formacao

    Energy Technology Data Exchange (ETDEWEB)

    Rodrigues, Rogerio Marques; Fonseca, Carlos Eduardo da [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2008-07-01

    A well test is an operation that allows the engineer assessing reservoir performance and fluids properties by measuring flow rates and pressures under a range of flowing conditions. In most well tests, a limited amount of fluid is allowed to flow from the formation being tested. The formation is isolated behind cemented casing and perforated at the formation depth or, in open hole, the formation is straddled by a pair of packers that isolate the formation. During the flow period, the pressure at the formation is monitored over time. Then, the formation is closed (or shut in) and the pressure monitored at the formation while the fluid within the formation equilibrates. The analysis of these pressure changes can provide information on the size and shape of the formation as well as its ability to produce fluids. . The flow of fluid through the column test causes your heating and hence its elongation. Several factors affect the rate of exchange of heat as well and the characteristics of the fluid, the flow of time and the flow and the existence of deep water. The prediction of temperature over well, in its various components, and the effect caused in the column test is not a trivial task. Some authors, for example, describe a method of calculating the behaviour of columns of production, making it simpler variation of constant temperature throughout the entire column, a fact that this does not occur in practice. The work aims at presenting the advantages of using the numerical simulation in determining the efforts and corresponding movements of the column of test of formation. (author)

  16. Brine migration test for Asse Mine, Federal Republic of Germany: final test plan

    Energy Technology Data Exchange (ETDEWEB)

    1983-07-01

    The United States and the Federal Republic of Germany (FRG) will conduct a brine migration test in the Asse Salt Mine in the FRG as part of the US/FRG Cooperative Radioactive Waste Management Agreement. Two sets of two tests each will be conducted to study both liquid inclusion migration and vapor migration in the two salt types chosen for the experiments: (1) pure salt, for its characteristics similar to the salt that might occur in potential US repositories, and (2) transitional salt, for its similarity to the salt that might occur in potential repositories in Germany.

  17. Integrative planning theory and practice of modern agricultural demonstration zone%现代农业示范区总体规划理论与实践

    Institute of Scientific and Technical Information of China (English)

    朱绪荣; 李靖; 付海英

    2013-01-01

    Planning can guide the construction of the modern agricultural demonstration zone(MASZ) in high level. A scientific guiding theories system may smooth the process of the planning and its appliance. Based on the characters of the modern agriculture, we try to establish such theory system by summing up relevant theories using the hierarchical classification method. This theory system includes theories about site setting, development definition, general arrangement, industry development, location, industry planning, science & technology supporting, profit analysis, innovation of the mechanism, etc. The overall design is an important part of the MASZ planning, which mainly summed and integrated the basic theories about development definition, location, industry planning. In guiding the development definition, there are mainly theories about the basic role of agriculture and about multi-functions of agriculture. In guiding the general arrangement, there are theories about system engineering and recycle agriculture. In guiding the industry development, there are theories about major industry choosing, industry chain, industry construction. In guiding location, there are theories of growth pole, core&axis, agriculture districts division. The practice of this guiding theories system is showed in the case of The Planning of the Agriculture Demonstration Zone of Haikou City. In this planning, we defined the function of Haikou MASZ by considering such factors as strengthening the local industries, efficiently supplying of vegetables, developing low-coal agriculture, leading zone development, improving the international competing advantage, attracting tourists, etc. According to theory of system, we designed a positive cycle system, in which, agriculture products processing is as engine, technology innovation is support factor, social agriculture service is associate factor, all industries react and coordinate well. The major industries were chosen according factors as

  18. Draft Plan to Develop Non-Intrusive Load Monitoring Test Protocols

    Energy Technology Data Exchange (ETDEWEB)

    Mayhorn, Ebony T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sullivan, Greg P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Petersen, Joseph M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Baechler, Michael C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-09-29

    This document presents a Draft Plan proposed to develop a common test protocol that can be used to evaluate the performance requirements of Non-Intrusive Load Monitoring. Development on the test protocol will be focused on providing a consistent method that can be used to quantify and compare the performance characteristics of NILM products. Elements of the protocols include specifications for appliances to be used, metrics, instrumentation, and a procedure to simulate appliance behavior during tests. In addition, three priority use cases for NILM will be identified and their performance requirements will specified.

  19. Reliability Analysis and Test Planning using CAPO-Test for Existing Structures

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Engelund, S.; Faber, M. H.

    2000-01-01

    of uncertainty related to this method are described. It is shown how the uncertainty in the transformation from the CAPO-test results to estimates of the concrete strength can be modeled. Further, the statistical uncertainty is modeled using Bayesian statistics. Finally, it is shown how reliability-based optimal...

  20. Test-Access Planning and Test Scheduling for Embedded Core-Based System Chips

    NARCIS (Netherlands)

    Goel, Sandeep Kumar

    2005-01-01

    Advances in the semiconductor process technology enable the creation of a complete system on one single die, the so-called system chip or SOC. To reduce time-to-market for large SOCs, reuse of pre-designed and pre-veried blocks called cores is employed. Like the design style, testing of SOCs can be

  1. Planning the research and development necessary for accelerator transmutation of waste, leading to integrated proof of performance testing

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, D.R.; Pasamehmetoglu, K.; Finck, P.; Pitcher, E.; Khalil, H.; Todosow, M.; Hill, R.; Van Tuyle, G.; Laidler, J.; Crawford, D.; Thomas, K. [Los Alamos National Lab., NM (United States)]|[Argonne National Lab., IL (United States)]|[Brookhaven National Lab., Upton, NY (United States)

    2001-07-01

    The Research and Development (R and D) Plan for the Accelerator Transmutation of Waste (ATW) Program has been developed for the Department of Energy, Office of Nuclear Energy (DOE/NE) to serve as a focus and progressional guide in developing critical transmutation technologies. It is intended that the Plan will serve as a logical reference considering all elements of an integrated accelerator-driven transmutation system, and will maximize the use of resources by identifying and prioritizing research, design, development and trade activities. The R and D Plan provides a structured framework for identifying and prioritizing activities leading to technically-justifiable integrated Proof of Performance testing within ten years and ultimate demonstration of Accelerator Transmutation of Waste (ATW). The Plan builds from the decision objectives specified for ATW, utilizes informational input from the ATW Roadmap and programmatic System Point Design efforts, and employs the knowledge and expertise provided by professionals familiar with ATW technologies. With the firm intent of understanding what, why and when information is needed, including critical interfaces, the Plan then develops a progressional strategy for developing ATW technologies with the use of a Technology Readiness Level (TRL) scale. The TRL approach is first used to develop a comprehensive, yet generic, listing of experimental, analytical and trade study activities critical to developing ATW technologies. Technology-specific and concept-specific aspects are then laid over the generic mapping to gage readiness levels. Prioritization criteria for reducing technical uncertainty, providing information to decision points, and levering off of international collaborations are then applied to focus analytical, experimental and trade activities. (author)

  2. Pre-study for the development of R and D-program for the plant DEPRA (demonstration and testing of technologies for wastewater and sludge treatment). Final report; Voruntersuchung zur Ausarbeitung der F und E-Konzeption der DEPRA. Abschlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Raebiger, N.

    2002-07-01

    The purpose of the planned demonstration and testing plant (DEPRA) in Bremerhaven is to have a possibility to demonstrate and test new or further developed wastewater and sludge treatments in industrial scale. With that DEPRA will contribute to transfer attained results of research and development as soon as possible in to practice. The plant DEPRA will provide extensive possibilities of process control of different stages of wastewater and sludge treatment as well as the operation of additional process stages. The demonstration and testing plant should be open for research institutes and commercial users in Germany as well as for European countries in order to offer a possibility for projects concerning water purification. The aim of this study was to compile the framework of research projects for DEPRA. This report indicates trends of development for purification of municipal and industrial wastewater and sludge treatment whereas the potential of innovation for short, middle and long time implementation is considered. (orig.)

  3. 3D Printing in Zero G Technology Demonstration Mission: Summary of On-Orbit Operations, Material Testing, and Future Work

    Science.gov (United States)

    Prater, Tracie; Bean, Quincy; Werkheiser, Niki; Ordonez, Erick; Ledbetter, Frank; Ryan, Richard; Newton, Steve

    2016-01-01

    November through December of that year. Phase I flight operations yielded 14 unique parts (21 total specimens) that could be directly compared against ground-based prints of identical geometry manufactured using the printer prior to its launch to ISS. The 3DP unit functioned safely and produced specimens necessary to advance the understanding of the critical design and operational parameters for the FDM process as affected by the microgravity environment. From the standpoint of operations, 3DP demonstrated the ability to remove parts from the build-tray on-orbit, teleoperate the printer from the ground, perform critical maintenance functions within defined human factors limits, produce a functional tool that could be evaluated for form/fit/function, and uplink a new part file from the ground and produce it on the printer. The flight parts arrived at NASA Marshall Space Flight Center in Huntsville, Alabama in April 2015, where they underwent months of testing in the materials and processes laboratory. Ground and flight prints completed the following phases of testing: photographic/visual inspection, mass and density evaluation, structured light scanning, XRay and CT, mechanical testing, optical microscopy, scanning electron microscopy, and chemical analysis. This presentation will discuss the results of this testing as well as phase II operations for the printer, which took place in June and July of 2016. Lessons learned from the tech demo and their impacts on the design and development of the second generation 3D printer for ISS, the Additive Manufacturing Facility (AMF) by Made In Space will also be presented. In addition, progress in other elements of NASA's In Space Manufacturing (ISM) initiative such as the on-demand ISM utilization catalog, in-space Recycler ISS Technology Demonstration development, launch packaging recycling, in-space printable electronics, development of higher strength polymeric materials for 3D printing and Additive Construction by Mobile

  4. Demonstration test and evaluation of ultraviolet/ultraviolet catalyzed peroxide oxidation for groundwater remediation at Oak Ridge K-25 Site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    In the UItraviolet/Ultraviolet Catalyzed Groundwater Remediation program, W.J. Schafer Associates, Inc. (WJSA) demonstrated, tested and evaluated a new ultraviolet (UV) lamp integrated with an existing commercial technology employing UV catalyzed peroxide oxidation to destroy organics in groundwater at an Oak Ridge K-25 site. The existing commercial technology is the perox-pure{trademark} process of Peroxidation Systems Incorporated (PSI) that employs standard UV lamp technology to catalyze H{sub 2}O{sub 2} into OH radicals, which attack many organic molecules. In comparison to classical technologies for remediation of groundwater contaminated with organics, the perox-pure{trademark} process not only is cost effective but also reduces contaminants to harmless by-products instead of transferring the contaminants from one medium to another (such as in activated carbon or air stripping). Although the perox-pure{trademark} process is cost effective against many organics, it is not effective for some organic contaminants of interest to DOE such as TCA, which has the highest concentration of the organics at the K-25 test site. Contaminants such as TCA are treated more readily by direct photolysis using short wavelength UV light. WJSA has been developing a unique UV lamp which is very efficient in the short UV wavelength region. Consequently, combining this UV lamp with the perox-pure{trademark} process results in a means for treating essentially all organic contaminants. In the program reported here, the new UV lamp lifetime was improved and the lamp integrated into a PSI demonstration trailer. Even though this UV lamp operated at less than optimum power and UV efficiency, the destruction rate for the TCA was more than double that of the commercial unit. An optimized UV lamp may double again the destruction rate; i.e., a factor of four greater than the commercial system.

  5. Expanding HIV testing and counselling into communities: Feasibility, acceptability, and effects of an integrated family planning/HTC service delivery model by Village Health Teams in Uganda.

    Science.gov (United States)

    Brunie, Aurélie; Wamala-Mucheri, Patricia; Akol, Angela; Mercer, Sarah; Chen, Mario

    2016-10-01

    Improving HIV testing and counselling (HTC) requires a range of strategies. This article reports on HTC service delivery by Village Health Teams (VHTs) in Uganda in the context of a model integrating this new component into pre-existing family planning services. Eight health centres from matched pairs were randomly allocated to intervention or control. After being trained, 36 VHTs reporting to selected facilities in the intervention group started offering HTC along with family planning, while VHTs in the control group provided family planning only. Proficiency testing was conducted as external quality assurance. A survey of all 36 VHTs and 137 family planning clients in the intervention group and 119 clients in the control group and a review of record data were conducted after 10 months. Survey responses by VHTs and their clients in the intervention group demonstrate knowledge of counselling messages and safe testing. External quality assessment results provide additional evidence of competency. Eighty per cent of the family planning clients surveyed in the intervention group received an HIV test during the intervention; 27% of those were first-time testers. More clients had ever tested for HIV in the intervention group compared with the control; clients also retested more often. Findings indicate that this model is feasible and acceptable for expanding quality HTC into communities. This study was registered with ClinicalTrials.gov, number [NCT02244398].

  6. Component tests for the ITER Ion Cyclotron Transmission Line and Matching System - Status and Plans

    Science.gov (United States)

    Goulding, R. H.; McCarthy, M. P.; Deibele, C. E.; Rasmussen, D. A.; Swain, D. W.; Barber, G. C.; Campbell, I. H.; Gray, S. L.; Moon, R. L.; Pesavento, P. V.; Sanabria, R. M.; Fredd, E.; Greenough, N.; Kung, C.

    2015-11-01

    New Z0 = 50 Ω gas-cooled component designs for the ITER Ion Cyclotron Heating and Current Drive System have been successfully tested at high RF power levels. They include two types featuring spoke-ring assembly (SRA) inner conductor supports: 20° elbows, and variable length assembly bellows, both achieving RF voltages > 35 kV peak, and currents ~ 760 A peak during quasi-steady state operation. The SRA utilizes mechanically preloaded fused quartz spokes, increasing lateral load handling capability. Components with SRA supports have been seismically tested, with no variation in low power electrical performance detected after testing. A 3 MW four-port switch has also been successfully tested at high RF power, and tests of a 6 MW hybrid power splitter are planned in the near future. Latest results will be presented. Plans for arc localization tests in a 60 m SRA transmission line run, and RF tests of Z0 = 50 Ω and Z0 = 20 Ω matching components with water-cooled inner conductors will also be discussed. This manuscript has been authored by UT-Battelle, LLC, under Contract No. DE-AC05-00OR22725 with the U.S. Department of Energy.

  7. Engineering test plan for US/UK higher actinides irradiations tests

    Energy Technology Data Exchange (ETDEWEB)

    Basmajian, J A

    1981-03-01

    The objective of the Higher Actinides Irradiations Program is to verify the neutronic and irradiation performance of americium and curium oxides in a fast reactor. The data obtained from the irradiation will be used to assess the basic neutronics parameters for actinide elements and determine the irradiation potential of the oxides of {sup 241}Am and {sup 244}Cm. This information has application in breeder reactor physics, fuel cycle analysis and assessment of waste management options. The irradiation test program is a cooperative effort wherein the US is supplying the completed irradiation test pins, while the UK will perform the irradiation in their Prototype Fast Reactor (PFR). Postirradiation examination and data analyses will be conducted on a cooperative basis, with some examinations performed in the UK and others in the US. 5 figs., 5 tabs.

  8. Demonstration test results of organic materials' volumetric reduction using bio-ethanol, thermal decomposition and burning

    Energy Technology Data Exchange (ETDEWEB)

    Tagawa, Akihiro; Watanabe, Masahisa [Japan Atomic Energy Agency (JAEA), Chiyoda-KU, Tokyo (Japan)

    2013-07-01

    To discover technologies that can be utilized for decontamination work and verify their effects, economic feasibility, safety, and other factors, the Ministry of the Environment launched the 'FY2011 Decontamination Technology Demonstrations Project' to publicly solicit decontamination technologies that would be verified in demonstration tests and adopted 22 candidates. JAEA was commissioned by the Ministry of the Environment to provide technical assistance related to these demonstrations. This paper describes the volume reduction due to bio-ethanol, thermal decomposition and burning of organic materials in this report. The purpose of this study is that to evaluate a technique that can be used as biomass energy source, while performing volume reduction of contamination organic matter generated by decontamination. An important point of volume reduction technology of contaminated organic matter, is to evaluate the mass balance in the system. Then, confirming the mass balance of radioactive material and where to stay is important. The things that are common to all technologies, are ensuring that the radioactive cesium is not released as exhaust gas, etc.. In addition, it evaluates the cost balance and energy balance in order to understand the applicability to the decontamination of volume reduction technology. The radioactive cesium remains in the carbides when organic materials are carbonized, and radioactive cesium does not transfer to bio-ethanol when organic materials are processed for bio-ethanol production. While plant operating costs are greater if radioactive materials need to be treated, if income is expected by business such as power generation, depreciation may be calculated over approximately 15 years. (authors)

  9. Geopressured-Geothermal Drilling and Testing Plan, Volume II, Testing Plan; Dow Chemical Co. - Dept. of Energy Dow-DOE Sweezy No. 1 Well, Vermilion Parish, Louisiana

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-02-01

    The Dow/D.O.E. L. R. Sweezy No. 1 geopressured geothermal production well was completed in August of 1981. The well was perforated and gravel packed in approximately 50 feet of sand from 13,344 feet to 13,395 feet. Permeabilities of 6 to 914 millidarcies were measured with porosity of 25 to 36%. Static surface pressure after well clean-up was 5000 psi. At 1000 B/D flow rate the drawdown was 50 psi. The water produced in clean-up contained 100,000 ppm TDS. This report details the plan for testing this well with the goal of obtaining sufficient data to define the total production curve of the small, 939 acre, reservoir. A production time of six to nine months is anticipated. The salt water disposal well is expected to be completed and surface equipment installed such that production testing will begin by April 1, 1982. The program should be finished and reports written by February 28, 1983. The brine will be produced from the No.1 well, passed through a separator where the gas is removed, then reinjected into the No.2 (SWD) well under separator pressure. Flow rates of up to 25,000 B/D are expected. The tests are divided into a two-week short-term test and six to nine-month long-term tests with periodic downhole measurement of drawdown and buildup rates. Data obtained in the testing will be relayed by phoneline computer hookup to Otis Engineering in Dallas, Texas, where the reservoir calculations and modeling will be done. At the point where sufficient data has been obtained to reach the objectives of the program, production will be ended, the wells plugged and abandoned, and a final report will be issued.

  10. Desire for predictive testing for Alzheimer's disease and impact on advance care planning: a cross-sectional study

    National Research Council Canada - National Science Library

    Sheffrin, Meera; Stijacic Cenzer, Irena; Steinman, Michael A

    2016-01-01

    .... Using a nationally representative sample, we explored who would take a free and definitive test predictive of Alzheimer's disease, and examined how using such a test may impact advance care planning...

  11. Solar Dynamics Observatory On-Orbit Jitter Testing, Analysis, and Mitigation Plans

    Science.gov (United States)

    Liu, Kuo-Chia (Alice); Blaurock, Carl A.; Bourkland, Kristin L.; Morgenstern, Wendy M.; Maghami, Peiman G.

    2011-01-01

    The Solar Dynamics Observatory (SDO) was designed to understand the Sun and the Sun s influence on Earth. SDO was launched on February 11, 2010 carrying three scientific instruments: the Atmospheric Imaging Assembly (AIA), the Helioseismic and Magnetic Imager (HMI), and the Extreme Ultraviolet Variability Experiment (EVE). Both AIA and HMI are sensitive to high frequency pointing perturbations and have sub-arcsecond level line-of-sight (LOS) jitter requirements. Extensive modeling and analysis efforts were directed in estimating the amount of jitter disturbing the science instruments. To verify the disturbance models and to validate the jitter performance prior to launch, many jitter-critical components and subassemblies were tested either by the mechanism vendors or at the NASA Goddard Space Flight Center (GSFC). Although detailed analysis and assembly level tests were performed to obtain good jitter predictions, there were still several sources of uncertainties in the system. The structural finite element model did not have all the modes correlated to test data at high frequencies (greater than 50 Hz). The performance of the instrument stabilization system was not known exactly but was expected to be close to the analytical model. A true disturbance-to-LOS observatory level test was not available due to the tight schedule of the flight spacecraft, the cost in time and manpower, difficulties in creating gravity negation systems, and risks of damaging flight hardware. To protect the observatory jitter performance against model uncertainties, the SDO jitter team devised several on-orbit jitter reduction plans in addition to reserve margins on analysis results. Since some of these plans severely restricted the capabilities of several spacecraft components (e.g. wheels and High Gain Antennas), the SDO team performed on-orbit jitter tests to determine which jitter reduction plans, if any, were necessary to satisfy science LOS jitter requirements. The SDO on

  12. Resolve! Version 2.5: Flammable Gas Accident Analysis Tool Acceptance Test Plan and Test Results

    Energy Technology Data Exchange (ETDEWEB)

    LAVENDER, J.C.

    2000-10-17

    RESOLVE! Version 2 .5 is designed to quantify the risk and uncertainty of combustion accidents in double-shell tanks (DSTs) and single-shell tanks (SSTs). The purpose of the acceptance testing is to ensure that all of the options and features of the computer code run; to verify that the calculated results are consistent with each other; and to evaluate the effects of the changes to the parameter values on the frequency and consequence trends associated with flammable gas deflagrations or detonations.

  13. Data Link Processor (DLP) Operational Test and Evaluation/Integration Test Plan

    Science.gov (United States)

    1989-12-01

    Point-To-Point Router Hello (PPRH) PDU (d) Level 1 End-System Link State (LI-ELS) PDU (e) Mode S R’ute Packet (f) Long Moce S Packet (MSP) (g) Short MSP...PPRH Point-to-Point Router Hello RMS Remote Monitoring Subsystem R&PD Reliability and Performance Demonstration RS Record Special Observation SA... cnc ( N Lf) z HIz 0 000 m 0 0- odc 0 (. ba O 44J V 14 )W w s:44 0 0 > )4 -4 0 0~ (U 4-1 (4 b6 u HZ 0.eJ ti .- 4C 4~- Li -4 :) c~o i4 Zt 10 a) 04 W)4C

  14. Contraceptive social marketing: a continuous cycle of planning, testing and evaluating.

    Science.gov (United States)

    1985-01-01

    This article outlines the contraceptive marketing process used by the Social Marketing for Change (SOMARC) project. The 1st stage of the process involves analysis of the market, the consumer, and the social marketing organization's capabilities. In the 2nd stage, planning, data collected in the analysis stage are used to define objectives, segment target markets, and devise strategies for each element in the marketing mix. In the 3rd stage, all the elements in the marketing mix are developed and tested (e.g. product concepts, pricing, packaging, communication messages) and refined on the basis of test results. In stage 4, the action plan is implemented and marketing progress and institutional performance are monitored. Stage 5 includes an assessment of in-market effectiveness in terms of responses from consumers, retailers, and health professionals. The last stage feeds back to the 1st. All the reviewed data are recycled into analysis to begin again the continuous process of refinement and improvement.

  15. Systems Engineering Management Plan NASA Traffic Aware Planner Integration Into P-180 Airborne Test-Bed

    Science.gov (United States)

    Maris, John

    2015-01-01

    NASA's Traffic Aware Planner (TAP) is a cockpit decision support tool that provides aircrew with vertical and lateral flight-path optimizations with the intent of achieving significant fuel and time savings, while automatically avoiding traffic, weather, and restricted airspace conflicts. A key step towards the maturation and deployment of TAP concerned its operational evaluation in a representative flight environment. This Systems Engineering Management Plan (SEMP) addresses the test-vehicle design, systems integration, and flight-test planning for the first TAP operational flight evaluations, which were successfully completed in November 2013. The trial outcomes are documented in the Traffic Aware Planner (TAP) flight evaluation paper presented at the 14th AIAA Aviation Technology, Integration, and Operations Conference, Atlanta, GA. (AIAA-2014-2166, Maris, J. M., Haynes, M. A., Wing, D. J., Burke, K. A., Henderson, J., & Woods, S. E., 2014).

  16. Test Plan for Godiva Move from LANL TA-18 to Nevada Test Site Device Assembly Facility

    Energy Technology Data Exchange (ETDEWEB)

    Garcia, M

    2005-08-01

    Godiva is an unshielded, pulsed nuclear reactor, used to produce bursts of neutrons and gamma rays for irradiating test samples. The Godiva reactor is part of the TA-18 Facility at Los Alamos National Laboratory. The Godiva reactor is to be moved to the Device Assembly Facility (DAF) at the Nevada Test Site, northwest of Las Vegas, Nevada. Bursts of ionizing radiation from Godiva have been found to produce radio waves and electrical interference in circuits and electrical equipment (e.g., alarm systems, interlocks, recording devices) near Godiva. Safety and security concerns regarding Godiva at the DAF are: (1) Can Godiva pulses induce detonators elsewhere in the DAF to explode?, (2) What is the expected strength of the electrical signal from Godiva elsewhere in the DAF? (3) Will Godiva pulses trigger security alarms, requiring additional administrative controls? This report addresses these issues, and describes a brief set of electrical measurements intended to verify that electromagnetic emissions from Godiva are unchanged by its relocation, and below a threshold of safety for detonators that are outside the actual room Godiva resides in. The following points will be described: the nature of Godiva electrical emissions, predicted electric field at a given distance, electromagnetic frequency, safety threshold for detonators, recommended ''stay out'' zone around Godiva for detonators, and recommended measurements to be made once Godiva has been installed at DAF.

  17. Vadose Zone Transport Field Study: Detailed Test Plan for Simulated Leak Tests

    Energy Technology Data Exchange (ETDEWEB)

    Ward, Anderson L.; Gee, Glendon W.

    2000-06-23

    This report describes controlled transport experiments at well-instrumented field tests to be conducted during FY 2000 in support of DOE?s Vadose Zone Transport Field Study (VZTFS). The VZTFS supports the Groundwater/Vadose Zone Integration Project Science and Technology Initiative. The field tests will improve understanding of field-scale transport and lead to the development or identification of efficient and cost-effective characterization methods. These methods will capture the extent of contaminant plumes using existing steel-cased boreholes. Specific objectives are to 1) identify mechanisms controlling transport processes in soils typical of the hydrogeologic conditions of Hanford?s waste disposal sites; 2) reduce uncertainty in conceptual models; 3) develop a detailed and accurate data base of hydraulic and transport parameters for validation of three-dimensional numerical models; and 4) identify and evaluate advanced, cost-effective characterization methods with the potential to assess changing conditions in the vadose zone, particularly as surrogates of currently undetectable high-risk contaminants. Pacific Northwest National Laboratory (PNNL) manages the VZTFS for DOE.

  18. Corrective action investigation plan for Central Nevada Test Area CAU No. 417

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This Corrective Action Investigation Plan (CAIP) is part of a US Department of Energy (DOE)-funded environmental investigation of the Central Nevada Test Area (CNTA). The CNTA is located in Hot Creek Valley in Nye County, Nevada, adjacent to US Highway 6, about 15 kilometers (10 miles) northeast of Warm Springs. The CNTA was the site of Project Faultless, a nuclear device detonated in the subsurface by the US Atomic Energy Commission (AEC) in January 1968. The purpose of this test was to gauge the seismic effects of relatively large, high-yield detonations completed outside of the Nevada Test Site (NTS). The test was also used to determine the suitability of the site for future large detonations. The yield of the Faultless test was between 200 kilotons and 1 megaton (DOE, 1994c).

  19. CISO's guide to penetration testing a framework to plan, manage, and maximize benefits

    CERN Document Server

    Tiller, James S

    2011-01-01

    CISO's Guide to Penetration Testing: A Framework to Plan, Manage, and Maximize Benefits details the methodologies, framework, and unwritten conventions penetration tests should cover to provide the most value to your organization and your customers. Discussing the process from both a consultative and technical perspective, it provides an overview of the common tools and exploits used by attackers along with the rationale for why they are used. From the first meeting to accepting the deliverables and knowing what to do with the results, James Tiller explains what to expect from all phases of th

  20. Pilot-scale treatability testing -- Recycle, reuse, and disposal of materials from decontamination and decommissioning activities: Soda blasting demonstration

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The US Department of Energy (DOE) is in the process of defining the nature and magnitude of decontamination and decommissioning (D and D) obligations at its sites. With disposal costs rising and available storage facilities decreasing, DOE is exploring and implementing new waste minimizing D and D techniques. Technology demonstrations are being conducted by LMES at a DOE gaseous diffusion processing plant, the K-25 Site, in Oak Ridge, Tennessee. The gaseous diffusion process employed at Oak Ridge separated uranium-235 from uranium ore for use in atomic weapons and commercial reactors. These activities contaminated concrete and other surfaces within the plant with uranium, technetium, and other constituents. The objective of current K-25 D and D research is to make available cost-effective and energy-efficient techniques to advance remediation and waste management methods at the K-25 Site and other DOE sites. To support this objective, O`Brien and Gere tested a decontamination system on K-25 Site concrete and steel surfaces contaminated with radioactive and hazardous waste. A scouring system has been developed that removes fixed hazardous and radioactive surface contamination and minimizes residual waste. This system utilizes an abrasive sodium bicarbonate medium that is projected at contaminated surfaces. It mechanically removes surface contamination while leaving the surface intact. Blasting residuals are captured and dissolved in water and treated using physical/chemical processes. Pilot-scale testing of this soda blasting system and bench and pilot-scale treatment of the generated residuals were conducted from December 1993 to September 1994.

  1. User testing and performance evaluation of the Electronic Quality Improvement Platform for Plans and Pharmacies.

    Science.gov (United States)

    Pringle, Janice L; Kearney, Shannon M; Grasso, Kim; Boyer, Annette D; Conklin, Mark H; Szymanski, Keith A

    2015-01-01

    To user-test and evaluate a performance information management platform that makes standardized, benchmarked medication use quality data available to both health plans and community pharmacy organizations. Multiple health/drug plans and multiple chain and independent pharmacies across the United States. During the first phase of the study, user experience was measured via user satisfaction surveys and interviews with key personnel (pharmacists, pharmacy leaders, and health plan leadership). Improvements were subsequently made to the platform based on these findings. During the second phase of the study, the platform was implemented in a greater number of pharmacies and by a greater number of payers. User experience was then reevaluated to gather information for further improvements. The surveys and interviews revealed that users found the Web-based platform easy to use and beneficial in terms of understanding and comparing performance metrics. Primary concerns included lack of access to real-time data and patient-specific data. Many users also expressed uncertainty as to how they could use the information and data provided by the platform. The study findings indicate that while information management platforms can be used effectively in both pharmacy and health plan settings, future development is needed to ensure that the provided data can be transferred to pharmacy best practices and improved quality care.

  2. Attitudes and exercise adherence: test of the Theories of Reasoned Action and Planned Behaviour.

    Science.gov (United States)

    Smith, R A; Biddle, S J

    1999-04-01

    Three studies of exercise adherence and attitudes are reported that tested the Theory of Reasoned Action and the Theory of Planned Behaviour. In a prospective study of adherence to a private fitness club, structural equation modelling path analysis showed that attitudinal and social normative components of the Theory of Reasoned Action accounted for 13.1% of the variance in adherence 4 months later, although only social norm significantly predicted intention. In a second study, the Theory of Planned Behaviour was used to predict both physical activity and sedentary behaviour. Path analyses showed that attitude and perceived control, but not social norm, predicted total physical activity. Physical activity was predicted from intentions and control over sedentary behaviour. Finally, an intervention study with previously sedentary adults showed that intentions to be active measured at the start and end of a 10-week intervention were associated with the planned behaviour variables. A multivariate analysis of variance revealed no significant multivariate effects for time on the planned behaviour variables measured before and after intervention. Qualitative data provided evidence that participants had a positive experience on the intervention programme and supported the role of social normative factors in the adherence process.

  3. Demonstration and testing of coal/oil mixture as a fuel for a slot furnace. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Bjerklie, J.W.; Penty, R.A.

    1979-07-01

    An evaluation was made of the effects of heating with a coal/oil mixture (COM) on forgings and furnace construction materials. The forgings produced with COM in a slot forge furnace were subjected to an extensive series of metallurgical tests to determine what effect, if any, use of COM as a fuel had upon the parts forged. Fifty wt % bituminous coal crushed to 80% minus 325 mesh was mixed with 50 wt % number 6 fuel oil. Emulsifiers were added to keep the coal in suspension. It was demonstrated that the 50 wt % coal/oil mixture can be successfully used to produce steel forgings. Burning COM presented no problems in respect to the ease of heating the steel or in respect to the metallurgy of the forgings. The main findings of the investigation were that: COM can be used to forge steel successfully; use of COM requires that ceramic materials of furnace construction be selected with care; and the modifications required to burn COM are minor. There were no significant differences between steel forgings produced with number 2 fuel oil and steel forgings produced with COM.

  4. Demonstration, testing, & evaluation of in situ heating of soil. Draft final report, Volume II: Appendices A to E

    Energy Technology Data Exchange (ETDEWEB)

    Dev, H.; Enk, J.; Jones, D.; Saboto, W.

    1996-02-12

    This document is a draft final report for US DOE contract entitled, {open_quotes}Demonstration Testing and Evaluation of In Situ Soil Heating,{close_quotes} Contract No. DE-AC05-93OR22160, IITRI Project No. C06787. This report is presented in two volumes. Volume I contains the technical report This document is Volume II, containing appendices with background information and data. In this project approximately 300 cu. yd. of clayey soil containing a low concentration plume of volatile organic chemicals was heated in situ by the application of electrical energy. It was shown that as a result of heating the effective permeability of soil to air flow was increased such that in situ soil vapor extraction could be performed. The initial permeability of soil was so low that the soil gas flow rate was immeasurably small even at high vacuum levels. When scaled up, this process can be used for the environmental clean up and restoration of DOE sites contaminated with VOCs and other organic chemicals boiling up to 120{degrees}to 130{degrees}C in the vadose zone. Although it may applied to many types of soil formations, it is particularly attractive for low permeability clayey soil where conventional in situ venting techniques are limited by low air flow.

  5. Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field-investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans.

  6. Extended testing of a general contextual classifier using the massively parallel processor - Preliminary results and test plans. [for thematic mapping

    Science.gov (United States)

    Tilton, J. C.

    1985-01-01

    Earlier encouraging test results of a contextual classifier that combines spatial and spectral information employing a general statistical approach are expanded. The earlier results were of limited meaning because they were produced from small (50-by-50 pixel) data sets. An implementation of the contextual classifier on NASA Goddard's Massively Parallel Processor (MPP) is presented; for the first time the MPP makes feasible the testing of the classifier on large data sets (a 12-hour test on a VAX-11/780 minicomputer now takes 5 minutes on the MPP). The MPP is a Single-Instruction, Multiple Data Stream computer, consisting of 16,384 bit serial microprocessors connected in a 128-by-128 mesh array with each element having data transfer connections with its four nearest neighbors so that the MPP is capable of billions of operations per second. Preliminary results are given (with more expected for the conference) and plans are mentioned for extended testing of the contextual classifier on Thematic Mapper data sets.

  7. Receptive vocabulary knowledge tests: Their potential importance for planning a well-balanced vocabulary component of a language program

    OpenAIRE

    Wakeling, Elliott

    2015-01-01

    iii Abstract Nation and Webb (2011) state ‘Testing is one of the major jobs of the vocabulary teacher, because without good information about our learners’ vocabulary knowledge, we cannot do the most important job of planning a well-balanced program’ (p. 219). This paper evaluated different receptive vocabulary knowledge tests and assessed their potential to help a teacher plan a well-balanced vocabulary program. The Vocabulary Levels Test (VLT) was selected to assess the vocabulary kno...

  8. Test Plan to Evaluate the Relationship Among IAQ, Comfort, Moisture, and Ventilation in Humid Climates

    Energy Technology Data Exchange (ETDEWEB)

    Widder, Sarah H.; Martin, Eric

    2013-03-15

    This experimental plan describes research being conducted by Pacific Northwest National Laboratory (PNNL), in coordinatation with Florida Solar Energy Center (FSEC), Florida HERO, and Lawrence Berkeley National Laboratory (LBNL) to evaluate the impact of ventilation rate on interior moisture levels, temperature distributions, and indoor air contaminant concentrations. Specifically, the research team will measure concentrations of indoor air contaminants, ventilation system flow rates, energy consumption, and temperature and relative humidity in ten homes in Gainesville, FL to characterize indoor pollutant levels and energy consumption associated with the observed ventilation rates. PNNL and FSEC have collaboratively prepared this experimental test plan, which describes background and context for the proposed study; the experimental design; specific monitoring points, including monitoring equipment, and sampling frequency; key research questions and the associated data analysis approach; experimental logistics, including schedule, milestones, and team member contact information; and clearly identifies the roles and responsibilities of each team in support of project objectives.

  9. Test plan for preliminary study of inorganic contaminant removal from RMA groundwater

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, D.; Terkonda, P.; Weeks, N.

    1978-02-01

    This document consists of a major report on inorganic contaminant removal from ground water. In this plan, WES has been requested by the OPM-CDIR to conduct a literature review and preliminary laboratory treatability studies on various source waters at RMA. Recommendation is that the determination of suitable treatment processes be based on both engineering and economic analysis and that the processes be compatible with the organic contaminant treatment processes under study (activated carbon adsorption and ultraviolet/ozone oxidation). The amendment to the test plan presents the inorganic treatment processes found from the literature to be applicable to the inorganic contaminants in RMA ground water and outlines the bench scale study to be conducted at WES using the potential processes. The rest of the document is correspondence and reports on various water treatability.

  10. Demonstration of the Applicability of Novel Photoacoustic Aerosol Monitor for Optical Absorption Coefficient Determination. Laboratory and Field Test.

    Science.gov (United States)

    Ajtai, T.; Schnaiter, M.; Linke, C.; Vragel, M.; Filep, Á.; Fődi, L.; Motika, G.; Bozóki, Z.; Szabó, G.

    2009-04-01

    apportionment studies. The present system was successfully tested both under the laboratory and field circumstances. The results of these studied, demonstrated here, is shown excellent agreements with reference methods and presents the main characteristic performances of the system verifying the potential of Wasul-MuWaPas to characterizing the spectral properties of atmospheric aerosols. These researches were funded by Hungarian Ministry of Economy and Transport NKFP_07_A4_AEROS_EU.

  11. Detailed technical plan for Test Program Element-III (TPE-III) of the first wall/blanket shield engineering test program

    Energy Technology Data Exchange (ETDEWEB)

    Turner, L.R.; Praeg, W.F.

    1982-03-01

    The experimental requirements, test-bed design, and computational requirements are reviewed and updated. Next, in Sections 3, 4 and 5, the experimental plan, instrumentation, and computer plan, respectively, are described. Finally, Section 6 treats other considerations, such as personnel, outside participation, and distribution of results.

  12. Kilowatt Isotope Power System: component test report for the ground demonstration system jet condenser orifice performance. 77-KIPS-103

    Energy Technology Data Exchange (ETDEWEB)

    Brainard, E.L.

    1977-11-08

    The purpose of these tests was to determine which orifice elements achieved satisfactory hydraulic and thermal performance prior to their incorporation into the Jet Condenser Assembly. Requirements were as set forth within the Kilowatt Isotope Power System (KIPS) Component Test Procedure number 414 for the Jet Condenser Orifice Performance testing. The results of the performance testing conducted on the Jet Condenser Orifices are presented. Part Number 720841 Jet Condenser Orifice Nozzle successfully completed the orifice screening tests.

  13. Corrective Action Plan for Corrective Action Unit 261: Area 25 Test Cell A Leachfield System, Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    T. M. Fitzmaurice

    2000-08-01

    This Corrective Action Plan (CAP) has been prepared for the Corrective Action Unit (CAU)261 Area 25 Test Cell A Leachfield System in accordance with the Federal Facility and Consent Order (Nevada Division of Environmental Protection [NDEP] et al., 1996). This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 1999). Investigation of CAU 261 was conducted from February through May of 1999. There were no Constituents of Concern (COCs) identified at Corrective Action Site (CAS) 25-05-07 Acid Waste Leach Pit (AWLP). COCs identified at CAS 25-05-01 included diesel-range organics and radionuclides. The following closure actions will be implemented under this plan: Because COCs were not found at CAS 25-05-07 AWLP, no action is required; Removal of septage from the septic tank (CAS 25-05-01), the distribution box and the septic tank will be filled with grout; Removal of impacted soils identified near the initial outfall area; and Upon completion of this closure activity and approval of the Closure Report by NDEP, administrative controls, use restrictions, and site postings will be used to prevent intrusive activities at the site.

  14. Status and Plans for an SRF Accelerator Test Facility at Fermilab

    CERN Document Server

    Church, M; Nagaitsev, S

    2012-01-01

    A superconducting RF accelerator test facility is currently under construction at Fermilab. The accelerator will consist of an electron gun, 40 MeV injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, and multiple downstream beam lines for testing diagnostics and performing beam experiments. With 3 cryomodules installed this facility will initially be capable of generating an 810 MeV electron beam with ILC beam intensity. The facility can accommodate up to 6 cryomodules for a total beam energy of 1.5 GeV. This facility will be used to test SRF cryomodules under high intensity beam conditions, RF power equipment, instrumentation, and LLRF and controls systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

  15. Design and Demonstration of a Test-Rig for Static Performance-Studies of Permanent Magnet Couplings

    DEFF Research Database (Denmark)

    Högberg, Stig; Jensen, Bogi Bech; Bendixen, Flemming Buus

    2013-01-01

    The design and construction of an easy-to-use test-rig for permanent magnet couplings is presented. Static torque of permanent magnet couplings as a function of angular displacement is measured of permanent magnet couplings through an semi-automated test system. The test-rig is capable of measuring...

  16. Chemical Reactivity Testing for the National Spent Nuclear Fuel Program. Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Newsom, H.C.

    1999-01-24

    This quality assurance project plan (QAPjP) summarizes requirements used by Lockheed Martin Energy Systems, Incorporated (LMES) Development Division at Y-12 for conducting chemical reactivity testing of Department of Energy (DOE) owned spent nuclear fuel, sponsored by the National Spent Nuclear Fuel Program (NSNFP). The requirements are based on the NSNFP Statement of Work PRO-007 (Statement of Work for Laboratory Determination of Uranium Hydride Oxidation Reaction Kinetics.) This QAPjP will utilize the quality assurance program at Y-12, QA-101PD, revision 1, and existing implementing procedures for the most part in meeting the NSNFP Statement of Work PRO-007 requirements, exceptions will be noted.

  17. Four-Stage Audit Demonstrating Increased Uptake of HIV Testing in Acute Neurology Admissions Using Staged Practical Interventions.

    Directory of Open Access Journals (Sweden)

    Dilraj Singh Sokhi

    Full Text Available UK National Guidelines (UKNG advise HIV testing in clinically indicated neurological presentations. We audited the impact of our practical strategies to increase uptake of HIV testing at a regional acute neurology admissions unit.We audited HIV testing in 4 periods over 2 years: before we designed a UKNG-based "HIV testing in Neurology" protocol ("pre-protocol"; after dissemination of the protocol alone ("post-protocol"; post-protocol dissemination combined with both a tailored departmental admissions clerking proforma to prompt for HIV testing & consenting, and regular focussed tutorials to doctors on HIV testing in neurological patients ("post-proforma"; and finally one year after the post-proforma period ("+1 year". We also looked at the total number of HIV tests sent from the unit during the two-year period. We assessed significance using Fisher's exact test.47.8% of all acute neurology non-stroke admissions were eligible for HIV testing during all the audit periods. Testing rates were as follows: pre-protocol 21.9%; post-protocol 36.6%; post-proforma 83.3%; and at +1 year 65.4% (p<0.05 for both post-protocol and +1 year when compared to pre-protocol. Documentation of consent for HIV testing improved from 25% to 67.6% with the HIV-tailored clerking proforma. The total number of HIV tests requested from the unit doubled in the post-proforma period compared to pre-protocol (p<0.05.the combination of an HIV testing protocol, a tailored departmental clerking proforma and regular focussed teaching to doctors on indications for HIV testing led to a sustained increase in HIV testing uptake in our regional acute neurology admissions unit.

  18. A test case of computer aided motion planning for nuclear maintenance operation

    Energy Technology Data Exchange (ETDEWEB)

    Schmitzberger, E.; Bouchet, J.L. [Electricite de France (EDF), Dept. Surveillance Diagnostic Maintenance, 78 - Chatou (France); Schmitzberger, E. [Institut National Polytechnique, CRAN, 54 - Vandoeuvre les Nancy (France)

    2001-07-01

    Needs for improved tools for nuclear power plant maintenance preparation are expressed by EDF engineering. These are an easier and better management of logistics constraints such as free spaces for motions or handling tasks. The lack of generic or well suited tools and the specificity of nuclear maintenance operation have led EDF R and D to develop its own motion planning tools in collaboration with LAAS-CNRS, Utrecht University and the software publisher CADCENTRE within the framework of the three years Esprit LTR project MOLOG. EDF users needs will be summed up in the first part of the paper under the title ''Motion feasibility studies for maintenance operation'' and then compared to the current industrial offer in the ''Software's background'''s part. The definition and objectives ''Towards motion planning tools'' follows. It explains why maintenance preparation pertains to automatic motion planning and how it makes studies much simpler. The ''MOLOG's Benchmark and first result'''s part describes the test-case used to evaluate the MOLOG project and gives an outlook at the results obtained so far. (author)

  19. Dual Axis Radiographic Hydrodynamic Test Facility mitigation action plan. Annual report for 1997

    Energy Technology Data Exchange (ETDEWEB)

    Haagenstad, H.T.

    1998-01-15

    This Mitigation Action Plan Annual Report (MAPAR) has been prepared by the US Department of Energy (DOE) as part of implementing the Dual Axis Radiographic Hydrodynamic Test Facility (DARHT) Mitigation Action Plan (MAP). This MAPAR provides a status on specific DARHT facility design- and construction-related mitigation actions that have been initiated in order to fulfill DOE`s commitments under the DARHT MAP. The functions of the DARHT MAP are to (1) document potentially adverse environmental impacts of the Phased Containment Option delineated in the Final EIS, (2) identify commitments made in the Final EIS and ROD to mitigate those potential impacts, and (3) establish Action Plans to carry out each commitment (DOE 1996). The DARHT MAP is divided into eight sections. Sections 1--5 provide background information regarding the NEPA review of the DARHT project and an introduction to the associated MAP. Section 6 references the Mitigation Action Summary Table which summaries the potential impacts and mitigation measures; indicates whether the mitigation is design-, construction-, or operational-related; the organization responsible for the mitigation measure; and the projected or actual completion data for each mitigation measure. Sections 7 and 8 discuss the Mitigation Action Plan Annual Report and Tracking System commitment and the Potential Impacts, Commitments, and Action Plans respectively. Under Section 8, potential impacts are categorized into five areas of concern: General Environment, including impacts to air and water; Soils, especially impacts affecting soil loss and contamination; Biotic Resources, especially impacts affecting threatened and endangered species; Cultural/Paleontological Resources, especially impacts affecting the archeological site known as Nake`muu; and Human Health and Safety, especially impacts pertaining to noise and radiation. Each potential impact includes a brief statement of the nature of the impact and its cause(s). The commitment

  20. ART CCIM Phase II-A Off-Gas System Evaluation Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    Nick Soelberg; Jay Roach

    2009-01-01

    This test plan defines testing to be performed using the Idaho National Laboratory (INL) engineering-scale cold crucible induction melter (CCIM) test system for Phase II-A of the Advanced Remediation Technologies (ART) CCIM Project. The multi-phase ART-CCIM Project is developing a conceptual design for replacing the joule-heated melter (JHM) used to treat high level waste (HLW) in the Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS) with a cold crucible induction melter. The INL CCIM test system includes all feed, melter off-gas control, and process control subsystems needed for fully integrated operation and testing. Testing will include operation of the melter system while feeding a non-radioactive slurry mixture prepared to simulate the same type of waste feed presently being processed in the DWPF. Process monitoring and sample collection and analysis will be used to characterize the off-gas composition and properties, and to show the fate of feed constituents, to provide data that shows how the CCIM retrofit conceptual design can operate with the existing DWPF off-gas control system.

  1. Status and Plans for a Superconducting RF Accelerator Test Facility at Fermilab

    Energy Technology Data Exchange (ETDEWEB)

    Leibfritz, J.; Andrews, R.; Baffes, C.M.; Carlson, K.; Chase, B.; Church, M.D.; Harms, E.R.; Klebaner, A.L.; Kucera, M.; Martinez, A.; Nagaitsev, S.; /Fermilab

    2012-05-01

    The Advanced Superconducting Test Accelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beam lines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating a 750 MeV electron beam with ILC beam intensity. An expansion of this facility was recently completed that will provide the capability to upgrade the accelerator to a total beam energy of 1.5 GeV. Two new buildings were also constructed adjacent to the ASTA facility to house a new cryogenic plant and multiple superconducting RF (SRF) cryomodule test stands. In addition to testing accelerator components, this facility will be used to test RF power systems, instrumentation, and control systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

  2. SU-E-T-508: End to End Testing of a Prototype Eclipse Module for Planning Modulated Arc Therapy On the Siemens Platform

    Energy Technology Data Exchange (ETDEWEB)

    Huang, L [Huntsman Cancer Hospital, Salt Lake City, UT (United States); Sarkar, V [University of Utah Hospitals, Salt Lake City, UT (United States); Spiessens, S [Varian Medical Systems France, Buc Cedex (France); Rassiah-Szegedi, P; Huang, Y; Salter, B [University Utah, Salt Lake City, UT (United States); Zhao, H [University of Utah, Salt Lake City, UT (United States); Szegedi, M [Huntsman Cancer Hospital, The University of Utah, Salt Lake City, UT (United States)

    2014-06-01

    Purpose: The latest clinical implementation of the Siemens Artiste linac allows for delivery of modulated arcs (mARC) using full-field flattening filter free (FFF) photon beams. The maximum doserate of 2000 MU/min is well suited for high dose treatments such as SBRT. We tested and report on the performance of a prototype Eclipse TPS module supporting mARC capability on the Artiste platform. Method: our spine SBRT patients originally treated with 12/13 field static-gantry IMRT (SGIMRT) were chosen for this study. These plans were designed to satisfy RTOG0631 guidelines with a prescription of 16Gy in a single fraction. The cases were re-planned as mARC plans in the prototype Eclipse module using the 7MV FFF beam and required to satisfy RTOG0631 requirements. All plans were transferred from Eclipse, delivered on a Siemens Artiste linac and dose-validated using the Delta4 system. Results: All treatment plans were straightforwardly developed, in timely fashion, without challenge or inefficiency using the prototype module. Due to the limited number of segments in a single arc, mARC plans required 2-3 full arcs to yield plan quality comparable to SGIMRT plans containing over 250 total segments. The average (3%/3mm) gamma pass-rate for all arcs was 98.5±1.1%, thus demonstrating both excellent dose prediction by the AAA dose algorithm and excellent delivery fidelity. Mean delivery times for the mARC plans(10.5±1.7min) were 50-70% lower than the SGIMRT plans(26±2min), with both delivered at 2000 MU/min. Conclusion: A prototype Eclipse module capable of planning for Burst Mode modulated arc delivery on the Artiste platform has been tested and found to perform efficiently and accurately for treatment plan development and delivered-dose prediction. Further investigation of more treatment sites is being carried out and data will be presented.

  3. ITER ECRH Upper Launcher: Test plan for qualification of the Diamond Torus Window Prototype III

    Energy Technology Data Exchange (ETDEWEB)

    Schreck, Sabine, E-mail: sabine.schreck@kit.edu [Karlsruhe Institute of Technology, Institute for Applied Materials, Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Aiello, Gaetano; Meier, Andreas; Strauss, Dirk [Karlsruhe Institute of Technology, Institute for Applied Materials, Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany); Gagliardi, Mario; Saibene, Gabriella [F4E, Antennas and Plasma Engineering, Josep Pla 2, Torres Diagonal Litoral B3, 08019 Barcelona (Spain); Scherer, Theo [Karlsruhe Institute of Technology, Institute for Applied Materials, Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany)

    2016-11-01

    Highlights: • A qualification program for the ITER diamond torus window is being developed. • The testing program for the qualification of the bare diamond disk is defined. • First qualification tests show a very good quality of the diamond disk prototypes. - Abstract: The diamond window is part of the electron cyclotron heating upper launcher system for ITER. Together with the isolation valve it constitutes the primary vacuum boundary and it also acts as first tritium barrier. Therefore the window is classified as Safety/Protection Important Component (SIC/PIC) with the nuclear safety function “confinement”. As the diamond window unit is not entirely covered by standard codes, an ad-hoc qualification program needs to be defined, including analysis, prototyping and testing. In the framework of a contract with F4E, the test program for a diamond window prototype is being developed with the aim to prove its operability for normal, accidental and incidental conditions as identified in the ITER load specifications. Tests range from dielectric loss measurements for the bare Chemical Vapour Deposition (CVD) diamond disk up to mechanical and vacuum tests for the complete window assembly. Finally mm-wave properties have to be characterized for the complete window. A clear definition of the testing requirements and of the acceptance criteria is necessary as well as a complete documentation of the process. This paper will present the development of the test plan for a window prototype, which is currently under manufacturing. First tests are directed to the characterization of the bare diamond disk with a focus on its dielectric properties.

  4. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 496: Buried Rocket Site, Antelope Lake, Tonopah Test Range

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

    2004-05-01

    This Streamlined Approach for Environmental Restoration (SAFER) plan details the activities necessary to close Corrective Action Unit 496: Buried Rocket Site, Antelope Lake. CAU 496 consists of one site located at the Tonopah Test Range, Nevada.

  5. Post-test evaluation of the geology, geochemistry, microbiology, and hydrology of the in situ air stripping demonstration site at the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Eddy Dilek, C.A.; Looney, B.B.; Hazen, T.C.; Nichols, R.L.; Fliermans, C.B.; Parker, W.H.; Dougherty, J.M.; Kaback, D.S.; Simmons, J.L.

    1993-07-01

    A full-scale demonstration of the use of horizontal wells for in situ air stripping for environment restoration was completed as part of the Savannah River Integrated Demonstration Program. The demonstration of in situ air stripping was the first in a series of demonstrations of innovative remediation technologies for the cleanup of sites contaminated with volatile organic contaminants. The in situ air stripping system consisted of two directionally drilled wells that delivered gases to and extract contamination from the subsurface. The demonstration was designed to remediate soils and sediments in the unsaturated and saturated zones as well as groundwater contaminated with volatile organic compounds. The demonstration successfully removed significant quantities of solvent from the subsurface. The field site and horizontal wells were subsequently used for an in situ bioremediation demonstration during which methane was added to the injected air. The field conditions documented herein represent the baseline status of the site for evaluating the in situ bioremediation as well as the post-test conditions for the in situ air stripping demonstration. Characterization activities focused on documenting the nature and distribution of contamination in the subsurface. The post-test characterization activities discussed herein include results from the analysis of sediment samples, three-dimensional images of the pretest and post-test data, contaminant inventories estimated from pretest and post-test models, a detailed lithologic cross sections of the site, results of aquifer testing, and measurements of geotechnical parameters of undisturbed core sediments.

  6. Supplemental Investigation Plan for FFACO Use Restrictions, Nevada Test Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Lynn Kidman

    2008-02-01

    This document is part of an effort to re-evaluate all FFACO URs against the current RBCA criteria (referred to in this document as the Industrial Sites [IS] RBCA process) as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006a). After reviewing all of the existing FFACO URs, the 12 URs addressed in this Supplemental Investigation Plan (SIP) could not be evaluated against the current RBCA criteria as sufficient information about the contamination at each site was not available. This document presents the plan for conducting field investigations to obtain the needed information. This SIP includes URs from Corrective Action Units (CAUs) 326, 339, 358, 452, 454, 464, and 1010, located in Areas 2, 6, 12, 19, 25, and 29 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada; and CAU 403, located in Area 3 of the Tonopah Test Range, which is approximately 165 miles north of Las Vegas, Nevada.

  7. Addendum to Environmental Monitoring Plan, Nevada Test Site and Support Facilities; Addendum 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-11-01

    This 1993 Addendum to the ``Environmental Monitoring Plan Nevada Test Site and Support Facilities -- 1991,`` Report No. DOE/NV/10630-28 (EMP) applies to the US Department of Energy`s (DOE`s) operations on the Continental US (including Amchitka Island, Alaska) that are under the purview of the DOE Nevada Operations Office (DOE/NV). The primary purpose of these operations is the conduct of the nuclear weapons testing program for the DOE and the Department of Defense. Since 1951, these tests have been conducted principally at the Nevada Test Site (NTS), which is located approximately 100 miles northwest of Las Vegas, Nevada. In accordance with DOE Order 5400.1, this 1993 Addendum to the EMP brings together, in one document, updated information and/or new sections to the description of the environmental activities conducted at the NTS by user organizations, operations support contractors, and the US Environmental Protection Agency (EPA) originally published in the EMP. The EPA conducts both the offsite environmental monitoring program around the NTS and post-operational monitoring efforts at non-NTS test locations used between 1961 and 1973 in other parts of the continental US. All of these monitoring activities are conducted under the auspices of the DOE/NV, which has the stated policy of conducting its operations in compliance with both the letter and the spirit of applicable environmental statutes, regulations, and standards.

  8. Utility advanced turbine systems (ATS) technology readiness testing and pre-commercial demonstration. Quarterly report, April 1--June 30, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the US Department of Energy (DOE) is the development of the GE 7H and 9H combined cycle power systems. The major effort will be expended on detail design. Validation of critical components and technologies will be performed including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer confirmation testing. Processes will be developed to support the manufacture of the first system, which will be sited and operated in Phase 4. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue. A schematic of the GE H machine is shown. This report summarizes work accomplished in 2Q97.

  9. Utility Advanced Turbine Systems (ATS) technology readiness testing and pre-commercialization demonstration. Quarterly report, October 1--December 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the U.S. Department of Energy (DOE) is the development of the GE 7H and 9H combined cycle power systems. The major effort will be expended on detail design. Validation of critical components and technologies will be performed including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer confirmation testing. Processes will be developed to support the manufacture of the first system, which will be sited and operated in Phase 4. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue.

  10. Utility advanced turbine systems (ATS) technology readiness testing and pre-commercial demonstration. Quarterly report, January 1--March 31, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the US Department of Energy (DOE) is the development of the GE 7H and 9H combined cycle power systems. The major effort will be expended on detail design. Validation of critical components and technologies will be performed including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer confirmation testing. Processes will be developed to support the manufacture of the first system, which will be sited and operated in Phase 4. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue. A schematic of the GE H machine is shown. This report summarizes work accomplished in 1Q97.

  11. Recovery Efficiency Test Project: Phase 1, Activity report. Volume 1: Site selection, drill plan preparation, drilling, logging, and coring operations

    Energy Technology Data Exchange (ETDEWEB)

    Overbey, W.K. Jr.; Carden, R.S.; Kirr, J.N.

    1987-04-01

    The recovery Efficiency Test well project addressed a number of technical issues. The primary objective was to determine the increased efficiency gas recovery of a long horizontal wellbore over that of a vertical wellbore and, more specifically, what improvements can be expected from inducing multiple hydraulic fractures from such a wellbore. BDM corporation located, planned, and drilled a long radius turn horizontal well in the Devonian shale Lower Huron section in Wayne County, West Virginia, demonstrating that state-of-the-art technology is capable of drilling such wells. BDM successfully tested drilling, coring, and logging in a horizontal well using air as the circulating medium; conducted reservoir modeling studies to protect flow rates and reserves in advance of drilling operations; observed two phase flow conditions in the wellbore not observed previously; cored a fracture zone which produced gas; observed that fractures in the core and the wellbore were not systematically spaced (varied from 5 to 68 feet in different parts of the wellbore); observed that highest gas show rates reported by the mud logger corresponded to zone with lowest fracture spacing (five feet) or high fracture frequency. Four and one-half inch casting was successfully installed in the borehole and was equipped to isolate the horizontal section into eight (8) zones for future testing and stimulation operations. 6 refs., 48 figs., 10 tabs.

  12. Predicting intended use of voluntary HIV counselling and testing services among Tanzanian teachers using the theory of planned behaviour.

    Science.gov (United States)

    Kakoko, Deodatus Conatus; Astrøm, A N; Lugoe, Wycliffe L; Lie, Gro T

    2006-08-01

    The theory of planned behaviour (TPB) provides a conceptual model for understanding individual cognitions that influence behavioural intentions and enactment of the actual behaviours. This study examined the applicability of the TPB and the additional predictive role of perceived risk in predicting intended use of voluntary HIV counselling and testing (VCT) services. We conducted a cross-sectional questionnaire survey among 918 primary school teachers in the Mwanza region, Tanzania between September 2003 and November 2003. Analysis was based on 737 teachers (mean age 38.9) who had never tested for HIV. Results of the hierarchical regression analysis indicate that perceived behavioural control and attitude toward using VCT services were significant predictors of intention to use VCT services in the TPB model. Perceived behavioural control added 12% of variance to intention over and above attitudes and subjective norms, while perceived risk added 3% of variance. Socio-economic status did not moderate the predictive value of the TPB components. The present study demonstrates that the TPB is a useful conceptual framework for predicting intended use of HIV counselling and testing services among Tanzanian teachers. A theory-based VCT intervention programme among Tanzanian teachers should mainly focus on reducing social and psychological barriers related to the use of VCT services.

  13. The Demonstration Test Catchment Approach to Land and Water Management in the river Eden Watershed, UK. (Invited)

    Science.gov (United States)

    Jonczyk, J.; Quinn, P. F.; Haygarth, P.; Reaney, S.; Wilkinson, M.; Burke, S.; McGonigle, D.; Harris, B.

    2010-12-01

    The Demonstration Test Catchment (DTC) initiative is a five year project to address pollution issues in catchments. The initiative will study the wider environmental problems suffered by catchments which are under intense farming pressures and potential climate change impacts. The UK Department for Food, Agriculture and Rural Affairs (Defra) in partnership with the Environment Agency for England and Wales (EA) have funded this initiative to answer key policy concerns in catchments. The first key step has been the establishment of a ‘research platform’ at three catchments in the UK (The Eden, Wensum and Hampshire Avon) whereby funding of 9.3 million dollars has gone into funding new equipment and pollution sampling regimes have been established. Within each catchment between three and four, 8-10km2 sub-catchments have been established. The experimental design and thinking for DTCs will be explained fully in this paper. The next phase of the project will install an extensive suite of land management and pollution mitigation interventions. In parallel to this monitoring work, a full knowledge exchange package will seek to engage with farmers, the rural community and understand the governance regime at the broader catchment scale. There is also a need for a modelling component to upscale the findings to the whole of the UK. Whilst this is an ambitious goal, there is a very basic commitment of working with rural communities to come up with real solutions that will help underpin effective policy making for the future. The research platform covers a multi-scale approach to the monitoring strategy that will allow local grouping of mitigation measures to be studied local in terms of impact and propagated to the catchment scale. Even with high level of funding, the DTC can only fully instrument a catchment of 8-10km2. Beyond this scale, the EA and the standard catchment monitoring will continue as normal. The focus here is to prove that mitigation can be achieved within

  14. Warrior Injury Assessment Manikin (WIAMan) Lumbar Spine Model Validation: Development, Testing, and Analysis of Physical and Computational Models of the WIAMan Lumbar Spine Materials Demonstrator

    Science.gov (United States)

    2016-08-01

    6400 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) US Army Research Laboratory ATTN: RDRL-DPW...Anthropomorphic Test Device (ATD) Lumbar Spine Materials Demonstrator. A primary objective of this work was to generate experimental data for FEM validation...Lumbar Spine Materials Demonstrator 1 1.2.1 WIAMan ATD Lumbar Spine Assembly 1 1.2.2 Materials Consideration 2 1.2.3 Test Method 3 2. Preliminary

  15. Mechatronic demonstrator for testing sensors to be used in mobile robotics functioning on the inverted pendulum concept

    Science.gov (United States)

    Sandru, L.; Dolga, V.; Moldovan, C.; Savu, D.

    2016-08-01

    As the educational system is evolving, there are a lot of Mechatronic demonstrators used in schools and universities to demonstrate some technical, theoretical principle and analyzing new concept to apply this studied information, build practical hardware parts. The idea of using mobile robots for different applications is very common today. For choosing the best hardware and software configuration for the mobile robot it is necessary to make a documented analysis of the environment in which the mobile robot will perform. In our demonstrator we want to collect information from an optical sensor what can be used to maintain stability in a mobile robot equilibrium reading the reflected light from a surface. After hardware build we make a particularity study to see how optical sensors response in different ambient light and surface. To show some reference point we are collecting data from gyroscopic, accelerometer or rotation sensors.

  16. Structural Assembly Demonstration Experiment (SADE)

    Science.gov (United States)

    Akin, David L.; Mills, Raymond A.; Bowden, Mary L.

    1987-01-01

    The purpose of the Structural Assembly Demonstration Experiment (SADE) was to create a near-term Shuttle flight experiment focusing on the deployment and erection of structural truss elements. The activities of the MIT Space Systems Laboratory consist of three major areas: preparing and conducting neutral buoyancy simulation test series; producing a formal SADE Experiment plan; and studying the structural dynamics issues of the truss structure. Each of these areas is summarized.

  17. Corrective action investigation plan for Central Nevada Test Area, CAU No. 417

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-04-01

    This Corrective Action Investigation Plan (CAIP) is part of a US Department of Energy (DOE)-funded environmental investigation of the Central Nevada Test Area (CNTA). This CAIP addresses the surface investigation and characterization of 15 identified Corrective Action Sites (CASs). In addition, several other areas of the CNTA project area have surface expressions that may warrant investigation. These suspect areas will be characterized, if necessary, in subsequent CAIPs or addendums to this CAIP prepared to address these sites. This CAIP addresses only the 15 identified CASs as shown in Table 2-1 that are associated with the drilling and construction of a number of testing wells designed as part of an underground nuclear testing program. The purpose of the wells at the time of construction was to provide subsurface access for the emplacement, testing, and post detonation evaluations of underground nuclear devices. If contamination is found at any of the 15-surface CASs, the extent of contamination will be determined in order to develop an appropriate corrective action.

  18. Underground Test Area Activity Quality Assurance Plan Nevada National Security Site, Nevada. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Krenzien, Susan [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States); Farnham, Irene [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2015-06-01

    This Quality Assurance Plan (QAP) provides the overall quality assurance (QA) requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) activities. The requirements in this QAP are consistent with DOE Order 414.1D, Change 1, Quality Assurance (DOE, 2013a); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). If a participant’s requirement document differs from this QAP, the stricter requirement will take precedence. NNSA/NFO, or designee, must review this QAP every two years. Changes that do not affect the overall scope or requirements will not require an immediate QAP revision but will be incorporated into the next revision cycle after identification. Section 1.0 describes UGTA objectives, participant responsibilities, and administrative and management quality requirements (i.e., training, records, procurement). Section 1.0 also details data management and computer software requirements. Section 2.0 establishes the requirements to ensure newly collected data are valid, existing data uses are appropriate, and environmental-modeling methods are reliable. Section 3.0 provides feedback loops through assessments and reports to management. Section 4.0 provides the framework for corrective actions. Section 5.0 provides references for this document.

  19. Robotic path planning for non-destructive testing of complex shaped surfaces

    Science.gov (United States)

    Mineo, Carmelo; Pierce, Stephen Gareth; Wright, Ben; Nicholson, Pascual Ian; Cooper, Ian

    2015-03-01

    The requirement to increase inspection speeds for non-destructive testing (NDT) of composite aerospace parts is common to many manufacturers. The prevalence of complex curved surfaces in the industry provides significant motivation for the use of 6 axis robots for deployment of NDT probes in these inspections. A new system for robot deployed ultrasonic inspection of composite aerospace components is presented. The key novelty of the approach is through the accommodation of flexible robotic trajectory planning, coordinated with the NDT data acquisition. Using a flexible approach in MATLAB, the authors have developed a high level custom toolbox that utilizes external control of an industrial 6 axis manipulator to achieve complex path planning and provide synchronization of the employed ultrasonic phase array inspection system. The developed software maintains a high level approach to the robot programming, in order to ease the programming complexity for an NDT inspection operator. Crucially the approach provides a pathway for a conditional programming approach and the capability for multiple robot control (a significant limitation in many current off-line programming applications). Ultrasonic and experimental data has been collected for the validation of the inspection technique. The path trajectory generation for a large, curved carbon-fiber-reinforced polymer (CFRP) aerofoil component has been proven and is presented. The path error relative to a raster-scan tool-path, suitable for ultrasonic phased array inspection, has been measured to be within + 2mm over the 1.6 m2 area of the component surface.

  20. Underground Test Area Activity Quality Assurance Plan Nevada National Security Site, Nevada. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Farnham, Irene [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States); Krenzien, Susan [Navarro-Intera, LLC (N-I), Las Vegas, NV (United States)

    2012-10-01

    This Quality Assurance Plan (QAP) provides the overall quality assurance (QA) requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) activities. The requirements in this QAP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). NNSA/NSO, or designee, must review this QAP every two years. Changes that do not affect the overall scope or requirements will not require an immediate QAP revision but will be incorporated into the next revision cycle after identification. Section 1.0 describes UGTA objectives, participant responsibilities, and administrative and management quality requirements (i.e., training, records, procurement). Section 1.0 also details data management and computer software requirements. Section 2.0 establishes the requirements to ensure newly collected data are valid, existing data uses are appropriate, and environmental-modeling methods are reliable. Section 3.0 provides feedback loops through assessments and reports to management. Section 4.0 provides the framework for corrective actions. Section 5.0 provides references for this document.