  1. Lessons learned from an installation perspective for chemical demilitarization plant start-up at four operating incineration sites.

    Energy Technology Data Exchange (ETDEWEB)

    Motz, L.; Decision and Information Sciences

    2011-02-21

    This study presents the lessons learned by chemical storage installations as they prepared for the start of chemical demilitarization plant operations at the four current chemical incinerator sites in Alabama, Arkansas, Oregon, and Utah. The study included interviews with persons associated with the process and collection of available documents prepared at each site. The goal was to provide useful information for the chemical weapons storage sites in Colorado and Kentucky that will be going through plant start-up in the next few years. The study is not a compendium of what to do and what not to do. The information has been categorized into ten lessons learned; each is discussed individually. Documents that may be useful to the Colorado and Kentucky sites are included in the appendices. This study should be used as a basis for planning and training.

  2. Application of a high power laser to demilitarization problems

    Science.gov (United States)

    Lyman, O. R.

    1981-09-01

    Attempts to experimentally cut rocket motors, puncture agent cavities, and perform other operations associated with demilitarization of munitions with a high power CO2 laser are discussed. Laser requirements are outlined and problems associated with laser operations contiguous with hazardous materials are highlighted. It is concluded that while the use of a CO2 laser of about 10 kilowatts output has advantages for some demilitarization operations, it is not practical for many.

  3. 48 CFR 245.7310-1 - Demilitarization.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Demilitarization. 245.7310... Demilitarization. When demilitarization of property is required, whether on or off contractor or Government premises, the invitation must include the following clause: (a) Demilitarization. Item(s) ____...

  4. Demilitarization of Lance rocket motors

    Science.gov (United States)

    Sargent, Peter

    1995-02-01

    In 1992 Royal Ordnance was awarded contract by NAMSA for the demilitarization of NATO's European stock of Lance missile rocket motors. Lance is a liquid fueled surface to surface guided missile designed to give general battlefield support with either a nuclear or conventional capability at ranges of up to 130 km. The NAMSA contract required Royal Ordnance to undertake the following: (1) transportation of missiles from NATO depots in Europe to Royal Ordnance's factory at Bishopton in Scotland; (2) establishment of a dedicated demilitarization facility at Bishopton; and (3) demilitarization of live M5 and M6 training missiles by the end of 1994.

  5. Operating plan FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  6. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2015-01-01

    This paper investigates sales and operations planning (S&OP) at four Scandinavian industrial food producers in order to explore how the use of S&OP might help leaders to deal with the challenges set by the planning environment. Variables connected to the product and market, e.g., frequency of new...

  7. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2013-01-01

    This paper explores how the use of sales and operations planning (S&OP) may deal with the challenges set by the planning environment by investigating S&OP at four Scandinavian industrial food producers. Variables connected to the product and market, e.g. perishability, customer service elements...

  8. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2013-01-01

    This paper explores how the use of sales and operations planning (S&OP) may deal with the challenges set by the planning environment by investigating S&OP at four Scandinavian industrial food producers. Variables connected to the product and market, e.g. perishability, customer service elements...

  9. Operation plan : Alviso System

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the operation plan for ponds A2W, A3W, A7, A14, and A16 in the Alviso System at San Francisco Bay NWR Complex. Operating instructions for both winter and...

  10. Chemical Demilitarization Assembled Chemical Weapons Alternatives (Chem Demil-ACWA)

    Science.gov (United States)

    2015-12-01

    access machines , two (2) rocket cutting and shearing lines, two (2) neutralization system sampling stations, and three (3) Supercritical Water Oxidation...Selected Acquisition Report (SAR) RCS: DD-A&T(Q&A)823-243 Chemical Demilitarization-Assembled Chemical Weapons Alternatives (Chem Demil-ACWA) As...Abbreviations for MDAP Programs Acq O&M - Acquisition-Related Operations and Maintenance ACAT - Acquisition Category ADM - Acquisition Decision

  11. 41 CFR 101-45.001 - Demilitarization and decontamination.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Demilitarization and..., ABANDONMENT, OR DESTRUCTION OF PERSONAL PROPERTY § 101-45.001 Demilitarization and decontamination. (a... characteristics, or otherwise making it unfit for further use. (b) Demilitarization or decontamination of...

  12. Operations planning with VERT.

    Science.gov (United States)

    Moeller, G L; Digman, L A

    1981-01-01

    The Venture Evaluation and Review Technique (VERT) is a computerized, mathematically oriented network-based simulation technique designed to analyze risk existing in three parameters of most concern to managers in new projects or ventures--time, cost, and performance. As such, the VERT technique is more powerful than techniques such as GERT, which are basically time and cost oriented. VERT has been successfully utilized to assess the risks involved in new ventures and projects, in the estimation of future capital requirements, in control monitoring, and in the overall evaluation of ongoing projects, programs, and systems. It has been helpful to management in cases where there is a requirement to make decisions with incomplete or inadequate information about the alternatives. An example describing the application of VERT to an operational planning problem--the evaluation of electric power generating methods--is illustrated.

  13. Release mitigation spray safety systems for chemical demilitarization applications.

    Energy Technology Data Exchange (ETDEWEB)

    Leonard, Jonathan; Tezak, Matthew Stephen; Brockmann, John E.; Servantes, Brandon; Sanchez, Andres L.; Tucker, Mark David; Allen, Ashley N.; Wilson, Mollye C.; Lucero, Daniel A.; Betty, Rita G.

    2010-06-01

    Sandia National Laboratories has conducted proof-of-concept experiments demonstrating effective knockdown and neutralization of aerosolized CBW simulants using charged DF-200 decontaminant sprays. DF-200 is an aqueous decontaminant, developed by Sandia National Laboratories, and procured and fielded by the US Military. Of significance is the potential application of this fundamental technology to numerous applications including mitigation and neutralization of releases arising during chemical demilitarization operations. A release mitigation spray safety system will remove airborne contaminants from an accidental release during operations, to protect personnel and limit contamination. Sandia National Laboratories recently (November, 2008) secured funding from the US Army's Program Manager for Non-Stockpile Chemical Materials Agency (PMNSCMA) to investigate use of mitigation spray systems for chemical demilitarization applications. For non-stockpile processes, mitigation spray systems co-located with the current Explosive Destruction System (EDS) will provide security both as an operational protective measure and in the event of an accidental release. Additionally, 'tented' mitigation spray systems for native or foreign remediation and recovery operations will contain accidental releases arising from removal of underground, unstable CBW munitions. A mitigation spray system for highly controlled stockpile operations will provide defense from accidental spills or leaks during routine procedures.

  14. Conduct of operations implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, C.K.; Hall, R.L.

    1991-02-20

    This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

  15. Handling of the demilitarized zone using service providers in SAP

    Science.gov (United States)

    Iovan, A.; Robu, R.

    2016-02-01

    External collaboration needs to allow data access from the Internet. In a trusted Internet collaboration scenario where the external user works on the same data like the internal user direct access to the data in the Intranet is required. The paper presents a solution to get access to certain data in the Enterprise Resource Planning system, having the User Interface on a system in the Demilitarized Zone and the database on a system which is located in the trusted area. Using the Service Provider Interface framework, connections between separate systems can be created in different areas of the network. The paper demonstrates how to connect the two systems, one in the Demilitarized Zone and one in the trusted area, using SAP ERP 6.0 with Enhancement Package 7. In order to use the Service Provider Interface SAP Business Suite Foundation component must be installed in both systems. The advantage of using the Service Provider Interface framework is that the external user works on the same data like the internal user (and not on copies). This assures data consistency and less overhead for backup and security systems.

  16. Defense Logistics Agency Disposition Services Needs to Improve Demilitarization Program Self-Assessment Evaluations - Redacted

    Science.gov (United States)

    2016-12-20

    from reoccurring. In another example, for the March 30, 2015, self-assessment protocol “CPU [ central processing units ]/Laptops,”23 CDD Tucson personnel...the protocol required CDD personnel to review 23 Protocol ensures that CDD received only central processing units /laptops that had properly prepared...features from DoD property. 2 DLA Disposition Services operates three Centralized Demilitarization Divisions; the Tucson, Arizona, location processed

  17. Synchronizing Federal Operational Planning for National Catastrophes

    Science.gov (United States)

    2010-03-01

    63 1. Ireland: The Planning Uber -Department .............................. 63 2. Canada: Collaboration with Muscle...The Planning Uber -Department The Ireland National Government makes a clear distinction between planning and operations. The Minister of Defense (MOD...the federal planning system. The Irish model of an “ Uber -Department” for planning and the Canadian model of a department in charge of both operations

  18. 36 CFR 228.56 - Operating plans.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Operating plans. 228.56... Disposal of Mineral Materials General Provisions § 228.56 Operating plans. Any surface-disturbing operation... of an operating plan and to reasonable conditions as may be required to ensure proper protection of...

  19. LANL continuity of operations plan

    Energy Technology Data Exchange (ETDEWEB)

    Senutovitch, Diane M [Los Alamos National Laboratory

    2010-12-22

    The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratory EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may

  20. 78 FR 21245 - Continuity of Operations Plan

    Science.gov (United States)

    2013-04-10

    ... Federal Energy Regulatory Commission 18 CFR Part 376 Continuity of Operations Plan AGENCY: Federal Energy... Continuity of Operations Plan regulations to revise its hierarchy of delegation of Commission authority... Rule revises the Commission's Continuity of Operations Plan (COOP) regulations to incorporate...

  1. ICDF Complex Operations Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    W.M. Heileson

    2006-12-01

    This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

  2. 41 CFR 109-42.1102-8 - United States Munitions List items which require demilitarization.

    Science.gov (United States)

    2010-07-01

    ... List items which require demilitarization. 109-42.1102-8 Section 109-42.1102-8 Public Contracts and... Property § 109-42.1102-8 United States Munitions List items which require demilitarization. Heads of field organizations shall determine demilitarization requirements regarding combat material and military...

  3. 41 CFR 101-42.1102-8 - United States Munitions List items which require demilitarization.

    Science.gov (United States)

    2010-07-01

    ... List items which require demilitarization. 101-42.1102-8 Section 101-42.1102-8 Public Contracts and... States Munitions List items which require demilitarization. (a) General. The United States Munitions List is located in 22 CFR part 121. A system of demilitarization codes has been developed and...

  4. Operation plan : Baumberg Complex Pond System

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This Operations Plan describes the management activities required to meet the overall goals and objectives described in the Initial Stewardship Plan (ISP) and the...

  5. National Ignition Facility (NIF) operations procedures plan

    Energy Technology Data Exchange (ETDEWEB)

    Mantrom, D.

    1998-05-06

    The purpose of this Operations Procedures Plan is to establish a standard procedure which outlines how NIF Operations procedures will be developed (i.e , written, edited, reviewed, approved, published, revised) and accessed by the NIF Operations staff who must use procedures in order to accomplish their tasks. In addition, this Plan is designed to provide a guide to the NIF Project staff to assist them in planning and writing procedures. Also, resource and scheduling information is provided.

  6. Case history review--demilitarization combustion permits.

    Science.gov (United States)

    Gaborek, B J

    2000-02-01

    In May 1993, Administrative Browner of the U.S. Environmental Protection Agency (USEPA) announced that an indirect exposure health risk assessment was required for all hazardous waste combustion facilities seeking a Resource Conservation and Recovery Act permit. These types of risk assessments evaluate the health and environmental effects from inhalation of emissions (direct exposure) and from contact with environmental media and consumption of food products impacted by the emissions (indirect exposure). Completion of an indirect exposure risk assessment is often complicated by the various methodologies available for generating results and by the requirements of the regulating community. To minimize this complexity and to maximize consistency between risk assessments, the USEPA developed a number of detailed guidance documents. Site-specific conditions and toxicological data gaps, however, continue to present challenges not addressed by these guidance documents. This paper presents some of the specific challenges encountered by the U.S. Army Center for Health Promotion and Preventive Medicine when performing indirect exposure health risk assessments for several demilitarization combustion facilities.

  7. Peacekeeper ICBM PBPS (Stage IV) Safing and Demilitarization Project

    Science.gov (United States)

    Douglass, James L.

    2014-01-01

    Topics covered include: Overview of White Sands Test Facility (WSTF) and Capabilities. History of the Peacekeeper Intercontinental Ballistic Missile (ICBM) Program. Introduction to Safing & Demilitarization Project. Requirements for Safing Project. Approach Constellation Program. Need for Qualified Flight Hardware to Support Constellation. Ability to Use Peacekeeper Hardware to Support Constellation. Additional Uses for the Peacekeeper Post-Boost Propulsion System (PBPS) Hardware.

  8. Total system hazards analysis for the western area demilitarization facility

    Science.gov (United States)

    Pape, R.; Mniszewski, K.; Swider, E.

    1984-08-01

    The results of a hazards analysis of the Western Area Demilitarization facility (WADF) at Hawthorne, Nevada are summarized. An overview of the WADF systems, the hazards analysis methodology that was applied, a general discussion of the fault tree analysis results, and a compilation of the conclusions and recommendations for each area of the facility are given.

  9. Panamanian politics: the legacy of Torrijismo and prospects for demilitarization

    OpenAIRE

    Olarte, Glenn Jornada

    1991-01-01

    Approved for public release; distribution is unlimited. This thesis examines Torrijismo's legacy and impact on the Public Force's professionalization and institutionalization in an attempt to ascertain prospects for the successful demilitarization of Panamanian politics. As a result of the 1989 U.S. invasion of Panama, 21 years of military dominance in Panama ended. Lieutenant, U.S. Navy (USN) author

  10. Quayside Operations Planning Under Uncertainty

    DEFF Research Database (Denmark)

    Iris, Cagatay; Jin, Jian Gang; Lee, Der-Hong

    The quayside operation problem is one of the key components in the management system for a container terminal. This work focuses on three important problems that represent a bottleneck on terminal operations: Berth Allocation Problem (BAP), Quay Crane Assignment and Scheduling Problems (QCASP......).The state-of-art models mostly rely on forecasted, deterministic vessel arrivals, and they mostly assume that uniform QC operations is maintained. However, in reality, these parameters are mostly random. In this study, we present a stochastic programming approach based on a decomposition algorithm to solve...

  11. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  12. New heuristics for planning operating rooms.

    NARCIS (Netherlands)

    Molina-Pariente, J.M.; Hans, E.W.; Framinan, J.M.; Gomez-Cia, T.

    2015-01-01

    We tackle the operating room planning problem of the Plastic Surgery and Major Burns Specialty of the University Hospital “Virgen del Rocio” in Seville (Spain). The decision problem is to assign an intervention date and an operating room to a set of surgeries on the waiting list, minimizing access t

  13. ICD Complex Operations and Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  14. National Security Technology Incubator Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-04-30

    This report documents the operations plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program will focus on serving businesses with national security technology applications by nurturing them through critical stages of early development. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). The operation plan includes detailed descriptions of the structure and organization, policies and procedures, scope, tactics, and logistics involved in sustainable functioning of the NSTI program. Additionally, the operations plan will provide detailed descriptions of continuous quality assurance measures based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Forms that assist in operations of NSTI have been drafted and can be found as an attachment to the document.

  15. Collaborative planning of operations in industrial symbiosis

    DEFF Research Database (Denmark)

    Herczeg, Gabor; Akkerman, Renzo

    2014-01-01

    Industrial symbiosis (IS) is cooperation between companies to achieve collective benefits by supplying and reusing industrial waste to substitute virgin resources in production. In this paper, we investigate the IS phenomenon from a supply chain management perspective. We propose a collaborative...... planning model to coordinate master planning of operations of waste suppliers and buyers. Furthermore, we analyze planning decisions related to IS when waste exchange is combined with virgin resource procurement. We demonstrate that conditions of virgin resource procurement affect the economic feasibility...... and waste utilization potential of IS....

  16. Kennedy Space Center Orion Processing Team Planning for Ground Operations

    Science.gov (United States)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    Topics in this presentation are: Constellation Ares I/Orion/Ground Ops Elements Orion Ground Operations Flow Orion Operations Planning Process and Toolset Overview, including: 1 Orion Concept of Operations by Phase 2 Ops Analysis Capabilities Overview 3 Operations Planning Evolution 4 Functional Flow Block Diagrams 5 Operations Timeline Development 6 Discrete Event Simulation (DES) Modeling 7 Ground Operations Planning Document Database (GOPDb) Using Operations Planning Tools for Operability Improvements includes: 1 Kaizen/Lean Events 2 Mockups 3 Human Factors Analysis

  17. Planning, Management, and Economics of Airport Operation

    Science.gov (United States)

    Wiley, J.

    1972-01-01

    An overview of the role of the airport in the transportation complex and in the community is presented. The establishment of the airport including its requirements in regional planning and the operation of the airport as a social and economic force are discussed.

  18. 36 CFR 228.106 - Operator's submission of surface use plan of operations.

    Science.gov (United States)

    2010-07-01

    ... supplemental plan of operations is submitted. The supplemental plan of operations need only address those... surface use plan of operations. 228.106 Section 228.106 Parks, Forests, and Public Property FOREST SERVICE....106 Operator's submission of surface use plan of operations. (a) General. No permit to drill on...

  19. 30 CFR 780.13 - Operation plan: Blasting.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Blasting. 780.13 Section 780.13... Operation plan: Blasting. (a) Blasting plan. Each application shall contain a blasting plan for the proposed... methods to be applied in controlling the adverse effects of blasting operations. (b) Monitoring...

  20. Enterprise Resource Planning, Operations and Management

    DEFF Research Database (Denmark)

    Hald, Kim Sundtoft; Mouritsen, Jan

    2013-01-01

    Purpose – This research aims to explore the enabling and constraining effects of enterprise resource planning (ERP) systems and speculate on how these can be linked to the four generic roles of operations management (OM) proposed by Slack et al. Design/methodology/approach – This research...... are linked conceptually. Based on the identified effects of ERP, the paper speculates on the managerial tasks of the production and operations manager (POM) in an ERP environment and lists a set of central concerns of potential relevance to POM and to future research. Research limitations...... for practicing POMs in managing the implementation and design of ERP to support the different domains of OM. Originality/value – Current studies of the effects of ERP and their link to the practice of OM tend to focus on one or a few roles of the emerging system. Such studies do not properly take into account...

  1. Chemical Demilitarization-Assembled Chemical Weapons Alternatives (Chem Demil-ACWA)

    Science.gov (United States)

    2013-12-01

    percent complete. Construction continues on the Munition Demilitarization Building (MDB), the Supercritical Water Oxidation (SCWO) Processing...and shearing lines, two (2) neutralization system sampling stations, and three (3) Supercritical Water Oxidation (SCWO) systems with aluminum

  2. 14 CFR 136.13 - Helicopter performance plan and operations.

    Science.gov (United States)

    2010-01-01

    ... TRANSPORTATION (CONTINUED) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS COMMERCIAL AIR TOURS AND NATIONAL PARKS AIR TOUR MANAGEMENT National Air Tour Safety Standards § 136.13 Helicopter performance plan and operations. (a) Each operator must complete a performance plan before...

  3. Automated transit planning, operation, and applications

    CERN Document Server

    Liu, Rongfang

    2016-01-01

    This book analyzes the successful implementations of automated transit in various international locations, such as Paris, Toronto, London, and Kuala Lumpur, and investigates the apparent lack of automated transit applications in the urban environment in the United States. The book begins with a brief definition of automated transit and its historical development. After a thorough description of the technical specifications, the author highlights a few applications from each sub-group of the automated transit spectrum. International case studies display various technologies and their applications, and identify vital factors that affect each system and performance evaluations of existing applications. The book then discusses the planning and operation of automated transit applications at both macro and micro levels. Finally, the book covers a number of less successful concepts, as well as the lessons learned, allow ng readers to gain a comprehensive understanding of the topic.

  4. National volcanic ash operations plan for aviation

    Science.gov (United States)

    ,; ,

    2007-01-01

    The National Aviation Weather Program Strategic Plan (1997) and the National Aviation Weather Initiatives (1999) both identified volcanic ash as a high-priority informational need to aviation services. The risk to aviation from airborne volcanic ash is known and includes degraded engine performance (including flameout), loss of visibility, failure of critical navigational and operational instruments, and, in the worse case, loss of life. The immediate costs for aircraft encountering a dense plume are potentially major—damages up to $80 million have occurred to a single aircraft. Aircraft encountering less dense volcanic ash clouds can incur longer-term costs due to increased maintenance of engines and external surfaces. The overall goal, as stated in the Initiatives, is to eliminate encounters with ash that could degrade the in-flight safety of aircrews and passengers and cause damage to the aircraft. This goal can be accomplished by improving the ability to detect, track, and forecast hazardous ash clouds and to provide adequate warnings to the aviation community on the present and future location of the cloud. To reach this goal, the National Aviation Weather Program established three objectives: (1) prevention of accidental encounters with hazardous clouds; (2) reduction of air traffic delays, diversions, or evasive actions when hazardous clouds are present; and (3) the development of a single, worldwide standard for exchange of information on airborne hazardous materials. To that end, over the last several years, based on numerous documents (including an OFCMsponsored comprehensive study on aviation training and an update of Aviation Weather Programs/Projects), user forums, and two International Conferences on Volcanic Ash and Aviation Safety (1992 and 2004), the Working Group for Volcanic Ash (WG/VA), under the OFCM-sponsored Committee for Aviation Services and Research, developed the National Volcanic Ash Operations Plan for Aviation and Support of the

  5. Environmental aspects of the demilitarization and destruction of ordnance

    Directory of Open Access Journals (Sweden)

    Radun B. Jeremić

    2012-01-01

    Full Text Available In the last ten years, the Serbian Army has been facing the problem of surplus of various ordnance, which resulted from the changes in the organizational structure and rationalization. In addition, at several locations in Serbia there is still a large amount of unexploded ordnance remaining after the NATO bombing. The paper examined the environmental aspects of the destruction of surplus ammunition and unexploded ordnance. A brief survey of the methods of destruction and the technological conditions for their implementation are presented. The impact of toxic constituents of ordnance on human health and the environment is analyzed in particular. In order to minimize environmental risks during the demilitarization process of ordnance, appropriate proposals are given.

  6. [From national strategic plans to operational implementation: opportunities and risks].

    Science.gov (United States)

    Etchepare, M

    2013-01-01

    Currently, all countries in Africa are - to various degrees - involved in reform and planning programs, either because they chose to or at the behest of international institutions working with them. Here we present an operational definition of a strategic plan and then analyze the factors that promote and constrain the planning process and the implementation of the plan thus developed.

  7. Planning and Conducting Offensive Counterinformation Operations

    Science.gov (United States)

    2002-04-01

    doctrine calls this special information operations (SIO)) which precludes timely data sharing and collaboration amongst the proper experts, planners, and...is classified as special information operations. Offensive information operations are conducted across the range of military operations while...Operations RF Radio Frequency ROE Rules of Engagement SecDef Secretary of Defense SIO Special Information Operations SOF Special Operations Force

  8. Operational Plan Ontology Model for Interconnection and Interoperability

    Science.gov (United States)

    Long, F.; Sun, Y. K.; Shi, H. Q.

    2017-03-01

    Aiming at the assistant decision-making system’s bottleneck of processing the operational plan data and information, this paper starts from the analysis of the problem of traditional expression and the technical advantage of ontology, and then it defines the elements of the operational plan ontology model and determines the basis of construction. Later, it builds up a semi-knowledge-level operational plan ontology model. Finally, it probes into the operational plan expression based on the operational plan ontology model and the usage of the application software. Thus, this paper has the theoretical significance and application value in the improvement of interconnection and interoperability of the operational plan among assistant decision-making systems.

  9. UAVSAR Instrument: Current Operations and Planned Upgrades

    Science.gov (United States)

    Lou, Yunling; Hensley, Scott; Chao, Roger; Chapin, Elaine; Heavy, Brandon; Jones, Cathleen; Miller, Timothy; Naftel, Chris; Fratello, David

    2011-01-01

    The Uninhabited Aerial Vehicle Synthetic Aperture Radar (UAVSAR) instrument is a pod-based Lband polarimetric synthetic aperture radar (SAR), specifically designed to acquire airborne repeat track SAR data for differential interferometric measurements. This instrument is currently installed on the NASA Gulfstream- III (G-III) aircraft with precision real-time Global Positioning System (GPS) and a sensor-controlled flight management system for precision repeat-pass data acquisitions. UAVSAR has conducted engineering and preliminary science data flights since October 2007 on the G-III. We are porting the radar to the Global Hawk Unmanned Airborne Vehicle (UAV) to enable long duration/long range data campaigns. We plan to install two radar pods (each with its own active array antenna) under the wings of the Global Hawk to enable the generation of precision topographic maps and single pass polarimetric-interferometry (SPI) providing vertical structure of ice and vegetation. Global Hawk's range of 8000 nm will enable regional surveys with far fewer sorties as well as measurements of remote locations without the need for long and complicated deployments. We are also developing P-band polarimetry and Ka-band single-pass interferometry capabilities on UAVSAR by replacing the radar antenna and front-end electronics to operate at these

  10. Demonstration of Plasma Arc Environmental Technology Applications for the Demilitarization of DOD Stockpiles

    Science.gov (United States)

    Smith, Ed; Zaghloul, Hany; Filius, Krag; Rivers, Tim

    2000-01-01

    Since 1989 the U.S. Army Construction Engineering Research Laboratories (USACERL) have been active participants in the research and development toward establishing Plasma Arc Technology (PAT) as an efficient, economical, and safe hazardous waste immobilization tool. A plasma torch capable of generating high temperatures makes this technology a viable and powerful tool for the thermal destruction of various military industrial waste streams into an innocuous ceramic material no longer requiring hazardous waste landfill (Class 1) disposal. The emerging pl asma environmental thermal treatment process, has been used to safely and efficiently meet the waste disposal needs for various demilitarized components disposal needs, such as: pyrotechnic smoke assemblies, thermal batteries, proximity fuses, cartridge actuated devices (CAD's), and propellant actuated devices (PAD's). MSE Technology Applications, Inc., (MSE) has proposed and fabricated a Mobile Plasma Treatment System to be a technology demonstrator for pilot-scale mobile plasma waste processing. The system is capable of providing small-scale waste remediation services, and conducting waste stream applicability demonstrations. The Mobile Plasma Treatment System's innovative concept provides the flexibility to treat waste streams at numerous sites and sites with only a limited quantity of waste, yet too hazardous to transport to a regional fixed facility. The system was designed to be operated as skid mounted modules; consisting of a furnace module, controls module, offgas module, and ancillary systems module. All system components have been integrated to be operated from a single control station with both semi-continuous feeding and batch slag-pouring capability.

  11. Optimizing Long-Term Capital Planning for Special Operations Forces

    Science.gov (United States)

    2015-06-01

    TERM CAPITAL PLANNING FOR SPECIAL OPERATIONS FORCES by Gretchen M. Radke June 2015 Thesis Advisor: Emily Craparo Co-Advisor: Jonathan Alt...REPORT TYPE AND DATES COVERED Master’s Thesis 4. TITLE AND SUBTITLE OPTIMIZING LONG-TERM CAPITAL PLANNING FOR SPECIAL OPERATIONS FORCES 5...words) The United States Special Operations Command (USSOCOM) J8 directorate is responsible for planning long-range capital expenditure for Special

  12. Simulation-based decision support for evaluating operational plans

    Directory of Open Access Journals (Sweden)

    Johan Schubert

    2015-12-01

    Full Text Available In this article, we describe simulation-based decision support techniques for evaluation of operational plans within effects-based planning. Using a decision support tool, developers of operational plans are able to evaluate thousands of alternative plans against possible courses of events and decide which of these plans are capable of achieving a desired end state. The objective of this study is to examine the potential of a decision support system that helps operational analysts understand the consequences of numerous alternative plans through simulation and evaluation. Operational plans are described in the effects-based approach to operations concept as a set of actions and effects. For each action, we examine several different alternative ways to perform the action. We use a representation where a plan consists of several actions that should be performed. Each action may be performed in one of several different alternative ways. Together these action alternatives make up all possible plan instances, which are represented as a tree of action alternatives that may be searched for the most effective sequence of alternative actions. As a test case, we use an expeditionary operation with a plan of 43 actions and several alternatives for these actions, as well as a scenario of 40 group actors. Decision support for planners is provided by several methods that analyze the impact of a plan on the 40 actors, e.g., by visualizing time series of plan performance. Detailed decision support for finding the most influential actions of a plan is presented by using sensitivity analysis and regression tree analysis. Finally, a decision maker may use the tool to determine the boundaries of an operation that it must not move beyond without risk of drastic failure. The significant contribution of this study is the presentation of an integrated approach for evaluation of operational plans.

  13. Ontological Models to Support Planning Operations Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Automation and autonomy technologies, such as automated planning software, are key elements in realizing the vision for space exploration. A fundamental requirement...

  14. Ontological Models to Support Planning Operations Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Automation and autonomy technologies, such as automated planning software, are key elements in realizing the vision for space exploration. However, the major...

  15. Microeconomics, Private Security, and the Significance to Operational Planning

    Science.gov (United States)

    2013-05-23

    MICROECONOMICS , PRIVATE SECURITY, AND THE SIGNIFICANCE TO OPERATIONAL PLANNING A Monograph by MAJ Kevin S. Clarke United... MICROECONOMICS , PRIVATE SECURITY, AND THE SIGNIFICANCE TO OPERATIONAL PLANNING 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER...of microeconomic principles of supply-demand theory by looking at specific conceptual variables to determine the relationship and influence on the

  16. 7 CFR 623.13 - Wetlands reserve plan of operations.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Wetlands reserve plan of operations. 623.13 Section... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE WATER RESOURCES EMERGENCY WETLANDS RESERVE PROGRAM § 623.13 Wetlands reserve plan of operations. (a) After NRCS has accepted the applicant for enrollment in the...

  17. Country Operational Plan and Reporting System

    Data.gov (United States)

    US Agency for International Development — This web-based information system allows for the annual entry and updating of Emergency Plan COPs, annual and semiannual program results, and budget information by...

  18. 2010 Cooperative Initial Attack Annual Operating Plan

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The objective of this plan is to provide a pre-approved system to coordinate efforts and exchange or utilize resources for the prevention, detection, and...

  19. Running PILOT: operational challenges and plans for an Antarctic Observatory

    Science.gov (United States)

    McGrath, Andrew; Saunders, Will; Gillingham, Peter; Ward, David; Storey, John; Lawrence, Jon; Haynes, Roger

    2008-07-01

    We highlight the operational challenges and planned solutions faced by an optical observatory taking advantage of the superior astronomical observing potential of the Antarctic plateau. Unique operational aspects of an Antarctic optical observatory arise from its remoteness, the polar environment and the unusual observing cycle afforded by long continuous periods of darkness and daylight. PILOT is planned to be run with remote observing via satellite communications, and must overcome both limited physical access and data transfer. Commissioning and lifetime operations must deal with extended logistics chains, continual wintertime darkness, extremely low temperatures and frost accumulation amidst other challenging issues considered in the PILOT operational plan, and discussed in this presentation.

  20. SYSTEM PLANNING WITH THE HANFORD WASTE OPERATIONS SIMULATOR

    Energy Technology Data Exchange (ETDEWEB)

    CRAWFORD TW; CERTA PJ; WELLS MN

    2010-01-14

    At the U. S. Department of Energy's Hanford Site in southeastern Washington State, 216 million liters (57 million gallons) of nuclear waste is currently stored in aging underground tanks, threatening the Columbia River. The River Protection Project (RPP), a fully integrated system of waste storage, retrieval, treatment, and disposal facilities, is in varying stages of design, construction, operation, and future planning. These facilities face many overlapping technical, regulatory, and financial hurdles to achieve site cleanup and closure. Program execution is ongoing, but completion is currently expected to take approximately 40 more years. Strategic planning for the treatment of Hanford tank waste is by nature a multi-faceted, complex and iterative process. To help manage the planning, a report referred to as the RPP System Plan is prepared to provide a basis for aligning the program scope with the cost and schedule, from upper-tier contracts to individual facility operating plans. The Hanford Tank Waste Operations Simulator (HTWOS), a dynamic flowsheet simulation and mass balance computer model, is used to simulate the current planned RPP mission, evaluate the impacts of changes to the mission, and assist in planning near-term facility operations. Development of additional modeling tools, including an operations research model and a cost model, will further improve long-term planning confidence. The most recent RPP System Plan, Revision 4, was published in September 2009.

  1. Sand and gravel mine operations and reclamation planning using microcomputers

    Energy Technology Data Exchange (ETDEWEB)

    Ariffin, J.B.

    1990-02-01

    The purpose of this study is to focus on the application of microcomputers, also known as personal computers, in planning for sand and gravel mine operations and reclamation at a site in Story County, Iowa. This site, called the Arrasmith Pit, is operated by Martin Marietta Aggregates, Inc. The Arrasmith site, which encompasses an area of about 25 acres, is a relatively small site for aggregate mining. However, planning for the concurrent mine operation and reclamation program at this site is just as critical as with larger sites and the planning process is the same.

  2. A Guide to Food Service Operation Planning with Information on Preparing and Submitting Plans and Specifications.

    Science.gov (United States)

    Ohio State Dept. of Health, Columbus.

    Guidelines are presented for planning a food service operation which is defined as any place kept or maintained for the purpose of preparing or serving meals or lunches for a consideration. Brief discussions are presented pertaining to the value of planning and the preparation and use of plans and specifications. Recommendations and specifications…

  3. A planning concept incorporating the knowledge of both planning and operations personnel

    Energy Technology Data Exchange (ETDEWEB)

    Valenca, M.M.; Nepomuceno, L.; Teixeira, J.C.F.; Santos Junior, A. [Universidade Estadual de Campinas, SP (Brazil)

    1994-12-31

    In this paper, the electrical operation planning problem and the available technological possibilities for the improvement of planner`s work process are analyzed. The importance of the expert`s experience in efficient operation plans production is pointed out. The useful knowledge in planning and operating environments and their automation by Artificial Intelligence techniques are evaluated. Finally, conception of a decision-making support system allowing the interaction of storage expertise with analysis programs proposed, in order to improve the planning process. (author) 15 refs., 4 figs.

  4. 1997 Operating plan for the Office of International Health Programs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    One year ago, the Office of International Health Programs provided you with our 1996 Operating Plan, which defined our ideas and ideals for conducting business in 1996. We have again this year undertaken an intensive planning effort, first reviewing our accomplishments and shortcomings during 1996, and then developing plans and priorities for the upcoming year, taking into account input from customers and outside review panels, and ensuring that the demands on the office have been balanced with anticipated human, financial, and material resources.

  5. Robust Planning for Effects-Based Operations

    Science.gov (United States)

    2006-06-01

    Force assets such as the Predator and Global Hawk 21 instead of the tactical uses of MAVs. The Air Force outlines its planning doctrine in Air Force...of UAVs. We have ISR UAVs (for example a Global Hawk), which we consider to be very good at performing ISR and have long range. We also model strike...ISR tasks per time-period for strike UAVs (A"isr) 2 ISR tasks per time-period for ISR UAVs (-y) 4 Figure 3-5. We solved the problem using Xpress Mosel

  6. Operational workforce planning for check-in counters at airports

    DEFF Research Database (Denmark)

    Stolletz, Raik

    2010-01-01

    This paper addresses operation models for workforce planning for check-in systems at airports. We characterize different tasks of the hierarchical workforce planning problem with time-dependent demand. A binary linear programming formulation is developed for the fortnightly tour scheduling problem...

  7. Setting the right incentives for global planning and operations

    NARCIS (Netherlands)

    Norde, Henk; Ozen, Ulas; Slikker, Marco

    2016-01-01

    We study incentive issues seen in a firm performing global planning and manufacturing, and local demand management. The stochastic demands in local markets are best observed by the regional business units, and the firm relies on the business units’ forecasts for planning of global manufacturing oper

  8. Tank farms justification for continued operations 007 Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Propson, J.G., Westinghouse Hanford

    1996-08-23

    This Implementation Plan (IP) provides detailed descriptions, cost estimates, and schedules of activities required to implement the controls specified in Flammable Gas/Slurry Growth Unreviewed Safety Question: Justification for Continued Operation for the Tank Farms at Hanford Site (WHC-SD-WM-JCO-007, Rev.0). This IP complies with the Interim Operational Safety Requirements (IOSR) Administrative Control 5.27 and WHC-IP-0842 Volume 4 Section 5.6 for such a plan.

  9. Operation Eclipse; Appreciation and Outline Plan

    Science.gov (United States)

    1945-04-25

    operation will1 be .made at’ the first opportunity to the .responsible Local Allied llilitary Coriander . ’ Telecorxiunications Sj^stems closed dorm on...34; Droi/ision of POL, etc., of Specialist personnel viicn they arrive in G3RI.i’ii’’IY, will be under ta,ken by the local Ground Force Coriander until

  10. INTELLIGENCE CYCLE PLANNING IN MILITARY COALITION OPERATIONS

    Directory of Open Access Journals (Sweden)

    Catalin ANTON

    2015-04-01

    Full Text Available Abstract A long list of allied or coalition type military actions against entities declared as aggressors, failed or terrorist states/organizations has been recorded for the past 25 years. To reach an end state for any action planned by the military or established at any decagon making level, usually the political one, all information must be shared throughout all coalition/ allied components. That is mainly done by specialized elements that play the role of primary structures in charge of analyzing all information necessary for the military commander’s decision-making process. In this context, the article aims to outline the importance of the decision-making process for military commandants, as part of large /important coalition / allied structures and the level of training required of the latter to use the intelligence cycle to fulfill their main mission in their area of responsibility.

  11. Campaign Planning for Peace Enforcement Operations

    Science.gov (United States)

    1994-05-17

    Security Council shall duly take account of failure to comply with such provisional measures . Article 41 The Security Council may decide what measures not...Disputes," gives the Security Council broad measures in which to encourage a peaceful settlement. 10 This chapter is the basis for UN PK operations...has been used independently (Libya, in 1986), and as a means to avoid the commitment of ground troops (Bosnia). This has its advntages , but one must

  12. Cyber Defense Planning: Operating on Unconventional Terrain

    Science.gov (United States)

    2012-09-01

    envisioned. They’ll also discover (Continued on page 8) 7Army Communicator Figure 1 U. S. Cyber Command as the Tier 1 CND -SP Report Documentation Page...the Tier 1 CND - SP. As of late 2009, no COCOM other than USSTRATCOM had created their own CND -SP, instead hiring DISA as the CND - SP for their...headquarters’ cyber positions. This and many others decisions have lead to a situation where, unless CND -SP actions crossed into operational chan- nels

  13. The Philae Lander: Science planning and operations

    Science.gov (United States)

    Moussi, Aurélie; Fronton, Jean-François; Gaudon, Philippe; Delmas, Cédric; Lafaille, Vivian; Jurado, Eric; Durand, Joelle; Hallouard, Dominique; Mangeret, Maryse; Charpentier, Antoine; Ulamec, Stephan; Fantinati, Cinzia; Geurts, Koen; Salatti, Mario; Bibring, Jean-Pierre; Boehnhardt, Hermann

    2016-08-01

    Rosetta is an ambitious mission launched in March 2004 to study comet 67P/Churyumov-Gerasimenko. It is composed of a space probe (Rosetta) and the Philae Lander. The mission is a series of premieres: among others, first probe to escort a comet, first time a landing site is selected with short turnaround time, first time a lander has landed on a comet nucleus. In November 2014, once stabilized on the comet, Philae has performed its "First Science Sequence". Philae's aim was to perform detailed and innovative in-situ experiments on the comet's surface to characterize the nucleus by performing mechanical, chemical and physical investigations on the comet surface. The main contribution to the Rosetta lander by the French space agency (CNES) is the Science Operation and Navigation Center (SONC) located in Toulouse. Among its tasks is the scheduling of the scientific activities of the 10 lander experiments and then to provide it to the Lander Control Center (LCC) located in DLR Cologne. The teams in charge of the Philae activity scheduling had to cope with considerable constraints in term of energy, data management, asynchronous processes and co-activities or exclusions between instruments. Moreover the comet itself, its environment and the landing conditions remained unknown until separation time. The landing site was selected once the operational sequence was already designed. This paper will explain the specific context of the Rosetta lander mission and all the constraints that the lander activity scheduling had to face to fulfill the scientific objectives specified for Philae. A specific tool was developed by CNES and used to design the complete sequence of activities on the comet with respect to all constraints. The baseline scenario for the lander operation will also be detailed as well as the sequence performed on the comet to highlight the difficulties and challenges that the operational team faced.

  14. Planning and Operation of Commercial Application Center

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jun Yeon; Kim, Kye Ryung; Lee, Tae Joon; Lee, Jae Hyeong; Park, Je Won; Lee, Jae Sang

    2003-06-15

    The objectives of this R and D project are as follows : First, transferring developed technologies to outside companies and operating technology market to vitalize technology transactions, Second, developing commercial application projects to transfer technologies for commercial purposes and to solve interface problems in commercial applications, Third, enhancing commercial utilizations of developed accelerator and beam utilization technologies, Finally. preparing infra-structures for the development of over 30 venture- businesses based on achieved technologies through the Proton Engineering Frontier Project.

  15. Operational readiness: an integral part of the facility planning process.

    Science.gov (United States)

    Kidd, LeeAnne; Howe, Rob

    2014-01-01

    Large capital building projects benefit from an operational readiness strategy prior to new facility occupancy. St. Joseph's Healthcare used a structured approach for their readiness planning that included individual work plan meetings, tools for ensuring integration across programs and services and process improvement support to ensure a smooth transition. Over 1100 staff were oriented using a Train-the-Trainer model. Significant effort was required to co-ordinate the customized training, which involved "staffing up" to ensure sufficient resources for backfill. Operational readiness planning places additional demands on managers, requiring support and assistance from dedicated resources both prior to occupancy and several months post-move.

  16. C-Division annual review and operating plan, August 1990

    Energy Technology Data Exchange (ETDEWEB)

    Morse, N.R.

    1990-11-01

    The Computing and Communications Division is responsible for the Laboratory's Integrated Computing Network as well as Laboratory-wide communications. Our computing network, used by 8000 people distributed throughout the nation, constitutes one of the most powerful scientific computing facilities in the world. The purpose of this publication is to inform our clients of our strategic and operating plans. We review major accomplishments since early 1989 and describe our strategic planning goals and specific projects that will guide our operations over the next couple of years. Our mission statement, planning considerations, and management policies and practices are also included.

  17. Disruption management - operations research between planning and execution

    DEFF Research Database (Denmark)

    Clausen, Jens; Larsen, Jesper; Larsen, Allan

    2001-01-01

    For a large number of applications Operations Research has a proven track record: it can deliver high quality solutions for planning problems. Important examples can be found in the airline industry, logistics and production management. This report will describe real-world examples of a novel way...... of applying Operations Research: As plans have to be adjusted to take last minute changes into consideration, OR can play an active role in such a situation by producing, maybe even in a pro-actively role, alternative plans. This type of activity is called Disruption Management....

  18. Campaign Planning/Operational Art, Primer AY 07: Joint Advanced Warfighting School (JAWS) Joint Operation Planning Process

    Science.gov (United States)

    2007-01-01

    Counterintelligence; Civilian Internees CIA Central Intelligence Agency CIAP Command Intelligence Architecture Plan CID Criminal Investigation...MILGP Military Group (assigned to American Embassy in host nation) MIO Maritime Intercept Operations MIW Mine Warfare MLRS

  19. Nevada Experiments and Operations Program (N Program) Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Nattrass, L.; Anastasio, M.R.

    2000-02-01

    This plan briefly describes the Lawrence Livermore National Laboratory (LLNL) institutional structure and how Nevada Experiments and Operations Program (N Program's) organization fits within this structure, roles and responsibilities, and management processes that govern N Program activities. This plan also serves as the Integrated Safety Management (ISM) Implementation Plan for N Program work. This plan applies to all work performed by and for LLNL that falls under the oversight of DOE/NV except LLNL activities in support of the Yucca Mountain Project Office (YMPO).

  20. Enhancing Cassini Operations & Science Planning Tools

    Science.gov (United States)

    Castello, Jonathan

    2012-01-01

    The Cassini team uses a variety of software utilities as they manage and coordinate their mission to Saturn. Most of these tools have been unchanged for many years, and although stability is a virtue for long-lived space missions, there are some less-fragile tools that could greatly benefit from modern improvements. This report shall describe three such upgrades, including their architectural differences and their overall impact. Emphasis is placed on the motivation and rationale behind architectural choices rather than the final product, so as to illuminate the lessons learned and discoveries made.These three enhancements included developing a strategy for migrating Science Planning utilities to a new execution model, rewriting the team's internal portal for ease of use and maintenance, and developing a web-based agenda application for tracking the sequence of files being transmitted to the Cassini spacecraft. Of this set, the first two have been fully completed, while the agenda application is currently in the early prototype stage.

  1. 36 CFR 9.37 - Plan of operations approval.

    Science.gov (United States)

    2010-07-01

    ..., natural catastrophe, acts of God, etc., for inspection shall not be included when computing either this... determination regarding the impact of this operation and cumulative impacts of all proposed and existing... Preservations Act of 1966 as implemented by 36 CFR part 800. (f) Approval of each plan of operations...

  2. 36 CFR 9.9 - Plan of operations.

    Science.gov (United States)

    2010-07-01

    ... minimum surface disturbance, (iv) Methods for disposal of all rubbish and other solid and liquid wastes... MANAGEMENT Mining and Mining Claims § 9.9 Plan of operations. (a) No operations shall be conducted within any... proposed mining; location and description of surface facilities, including dumps; (3) A description of the...

  3. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  4. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-05-01

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  5. Health planning for remote petrochemical field operations

    Energy Technology Data Exchange (ETDEWEB)

    Krieger, G.R.; Balge, M.Z.

    1995-12-31

    Occupational/Public Health Services are becoming increasingly required in projects that involve the extended presence of expatriates in remote underdeveloped areas of the world. These ``expats`` are defined as individuals living and working in the environment who are not indigenous to the area. Under this definition, workers who are resistant to a ``local`` strain of malaria and then relocate to another geographic within the same country can also be considered as ``biologic expatriates`` since their resistance profile for certain tropical diseases is not reflective of their new environment. Unlike a major infrastructure project in the industrialized world, project planners in remote areas of the developing world should be expected to make significant long term medical and environmental commitments. US companies have extensive experience in the business of large-scale development projects, e.g. oil and gas pipelines and well field development; however, these projects represent major long-term in-country commitments with potentially large labor forces and substantial and sustained impacts on local health and safety resources. The initial structuring of health and safety programs will, therefore, have long-term ramifications on the project both during construction and ``routine`` operations since the multi-national companies are increasingly expected to develop and maintain self-sustaining health, safety and environmental programs.

  6. A system analysis of the recruitment and retention problems associated with the program manager for chemical demilitarization

    OpenAIRE

    2001-01-01

    The primary purpose of this thesis is to investigate the problems of retaining qualified personnel in the Program Manager for Chemical Demilitarization organization through the end date of the program. To accomplish this the Program Manager for Chemical Demilitarization organization was analyzed from an open system prospective to identify the elements within the organization, and in the larger organizational environment, that are expected to contribute to the retention problem. In addition th...

  7. Tool for Military Logistics Planning of Peace Support Operations: The OTAS Planning Tool

    NARCIS (Netherlands)

    Merrienboer, S.A. van

    1998-01-01

    Within the research group Operations Research Studies Army of the TNO Physics and Electronics Laboratory the OTAS planning tool is developed for the Royal Netherlands Armed Forces. This paper gives a general and brief description of the tool.

  8. Operational planning of refineries; Planejamento operacional de refinarias

    Energy Technology Data Exchange (ETDEWEB)

    Sinay, Maria Cristina Fogliatti de [Instituto Militar de Engenharia (IME), Rio de Janeiro, RJ (Brazil); Bueno, Catia [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2004-07-01

    The activities integration that compose the petroleum logistic chain makes more complex its planning which is normally done in a joined level, using operation research models in order to find optimized solutions. When this integrated planning is repassed to the companies and its constitutes parts (mainly refinery) uncertainness are generated about the solution that will be adopted in case of new restrictions appear. Then, the purpose of this work is propose a procedure that is capable to adequate and specifies optimized solutions presented by corporative model to refinery operations, using 'What-if' and deterministic simulation technique with optimization. To achieve this objective will be analysed typical activities in refineries and basic principles to their operational planning. (author)

  9. The United States national volcanic ash operations plan for aviation

    Science.gov (United States)

    Albersheim, Steven; Guffanti, Marianne

    2009-01-01

    Volcanic-ash clouds are a known hazard to aviation, requiring that aircraft be warned away from ash-contaminated airspace. The exposure of aviation to potential hazards from volcanoes in the United States is significant. In support of existing interagency operations to detect and track volcanic-ash clouds, the United States has prepared a National Volcanic Ash Operations Plan for Aviation to strengthen the warning process in its airspace. The US National Plan documents the responsibilities, communication protocols, and prescribed hazard messages of the Federal Aviation Administration, National Oceanic and Atmospheric Administration, US Geological Survey, and Air Force Weather Agency. The plan introduces a new message format, a Volcano Observatory Notice for Aviation, to provide clear, concise information about volcanic activity, including precursory unrest, to air-traffic controllers (for use in Notices to Airmen) and other aviation users. The plan is online at http://www.ofcm.gov/p35-nvaopa/pdf/FCM-P35-2007-NVAOPA.pdf. While the plan provides general operational practices, it remains the responsibility of the federal agencies involved to implement the described procedures through orders, directives, etc. Since the plan mirrors global guidelines of the International Civil Aviation Organization, it also provides an example that could be adapted by other countries.

  10. Planning of operation & maintenance using risk and reliability based methods

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2015-01-01

    Operation and maintenance (OM) of offshore wind turbines contributes with a substantial part of the total levelized cost of energy (LCOE). The objective of this paper is to present an application of risk- and reliability-based methods for planning of OM. The theoretical basis is presented...... and illustrated by an example, namely for planning of inspections and maintenance of wind turbine blades. A life-cycle approach is used where the total expected cost in the remaining lifetime is minimized. This maintenance plan is continuously updated during the lifetime using information from previous...... inspections and from condition monitoring with time intervals between inspections and maintenance / repair options as the decision parameters....

  11. Web Application Software for Ground Operations Planning Database (GOPDb) Management

    Science.gov (United States)

    Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey

    2013-01-01

    A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.

  12. UMTS network planning, optimization, and inter-operation with GSM

    CERN Document Server

    Rahnema, Moe

    2008-01-01

    UMTS Network Planning, Optimization, and Inter-Operation with GSM is an accessible, one-stop reference to help engineers effectively reduce the time and costs involved in UMTS deployment and optimization. Rahnema includes detailed coverage from both a theoretical and practical perspective on the planning and optimization aspects of UMTS, and a number of other new techniques to help operators get the most out of their networks. Provides an end-to-end perspective, from network design to optimizationIncorporates the hands-on experiences of numerous researchersSingle

  13. Orbital Express mission operations planning and resource management using ASPEN

    Science.gov (United States)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Daniel

    2008-04-01

    As satellite equipment and mission operations become more costly, the drive to keep working equipment running with less labor-power rises. Demonstrating the feasibility of autonomous satellite servicing was the main goal behind the Orbital Express (OE) mission. Like a tow-truck delivering gas to a car on the road, the "servicing" satellite of OE had to find the "client" from several kilometers away, connect directly to the client, and transfer fluid (or a battery) autonomously, while on earth-orbit. The mission met 100% of its success criteria, and proved that autonomous satellite servicing is now a reality for space operations. Planning the satellite mission operations for OE required the ability to create a plan which could be executed autonomously over variable conditions. As the constraints for execution could change weekly, daily, and even hourly, the tools used create the mission execution plans needed to be flexible and adaptable to many different kinds of changes. At the same time, the hard constraints of the plans needed to be maintained and satisfied. The Automated Scheduling and Planning Environment (ASPEN) tool, developed at the Jet Propulsion Laboratory, was used to create the schedule of events in each daily plan for the two satellites of the OE mission. This paper presents an introduction to the ASPEN tool, an overview of the constraints of the OE domain, the variable conditions that were presented within the mission, and the solution to operations that ASPEN provided. ASPEN has been used in several other domains, including research rovers, Deep Space Network scheduling research, and in flight operations for the NASA's Earth Observing One mission's EO1 satellite. Related work is discussed, as are the future of ASPEN and the future of autonomous satellite servicing.

  14. Operational research models in warehouse design and planning

    OpenAIRE

    Geraldes, Carla A. S.; Carvalho, Sameiro; Pereira, Guilherme

    2010-01-01

    The design and operation of a warehouse involve many challenging decision problems. In this paper, a literature review on warehousing models is presented. Authors start with a hierarchy of decision problems encountered in setting up warehouse design and planning processes. Next, some operational research decision models and solution algorithms supporting decision making at each discussed level are presented. The aim is to link academic researchers and warehouse practitioners, explaining what ...

  15. Capacity planning in operations producing heavy plate cut shapes

    Directory of Open Access Journals (Sweden)

    R. Lenort

    2009-07-01

    Full Text Available The present approach to capacity planning in operations producing heavy metal shapes causes problems in fulfilling the required financial and volume indexes in production, as well as in meeting the work order completion dates. The article represents the methodology for optimal production scheduling in operations producing heavy plate cut shapes, which significantly eliminates the above-mentioned problems. The methodology is based on the application Generalized Assignment Problem (GAP.

  16. The CONSERT operations planning process for the Rosetta mission

    Science.gov (United States)

    Rogez, Yves; Puget, Pascal; Zine, Sonia; Hérique, Alain; Kofman, Wlodek; Altobelli, Nicolas; Ashman, Mike; Barthélémy, Maud; Biele, Jens; Blazquez, Alejandro; Casas, Carlos M.; Sitjà, Marc Costa; Delmas, Cédric; Fantinati, Cinzia; Fronton, Jean-François; Geiger, Bernhard; Geurts, Koen; Grieger, Björn; Hahnel, Ronny; Hoofs, Raymond; Hubault, Armelle; Jurado, Eric; Küppers, Michael; Maibaum, Michael; Moussi-Souffys, Aurélie; Muñoz, Pablo; O'Rourke, Laurence; Pätz, Brigitte; Plettemeier, Dirk; Ulamec, Stephan; Vallat, Claire

    2016-08-01

    The COmet Nucleus Sounding Experiment by Radio wave Transmission (CONSERT / Rosetta) has been designed to sound the interior of the comet 67P/Churyumov-Gerasimenko. This instrument consists of two parts: one onboard Rosetta and the other one onboard Philae. A good CONSERT science measurement sequence requires joint operations of both spacecrafts in a relevant geometry. The geometric constraints to be fulfilled involve the position and the orientation of both Rosetta and Philae. At the moment of planning the post-landing and long-term science operations for Rosetta instruments, the actual comet shape and the landing location remained largely unknown. In addition, the necessity of combining operations of Rosetta spacecraft and Philae spacecraft makes the planning process for CONSERT particularly complex. In this paper, we present the specific methods and tools we developed, in close collaboration with the mission and the science operation teams for both Rosetta and Philae, to identify, rank and plan the operations for CONSERT science measurements. The presented methods could be applied to other missions involving joint operations between two platforms, on a complex shaped object.

  17. Demilitarization of the Siachen conflict zone : concepts for implementation and monitoring.

    Energy Technology Data Exchange (ETDEWEB)

    Kanwal, Gurmeet (Indian Army); Hakeem, Asad (Pakistan Army); Vannoni, Michael Geoffrey; Rajen, Gaurav

    2007-09-01

    Pakistani and Indian militaries have been occupying the Siachen Glacier and surrounding regions for decades. Although a cease-fire is in place, continued occupation carries the risk of an inadvertent conflict, which could escalate into a full-fledged nuclear-backed confrontation. Political and military analysts in Pakistan and India now question the strategic significance of the Siachen Glacier and agree that under the right circumstances, military withdrawal from the Siachen Glacier region would not adversely affect either state. The difficulty lies in conducting the withdrawal in such a way that neither side feels vulnerable, and in maintaining the demilitarization in a way that can be verified. In this paper, the authors who have both held command responsibilities in the Siachen Glacier region present a process for conducting and verifying the demilitarization of the Siachen Glacier region. The authors discuss the role of monitoring and verification tools and their relevance to this border zone of conflict.

  18. The HAL 9000 Space Operating System Real-Time Planning Engine Design and Operations Requirements

    Science.gov (United States)

    Stetson, Howard; Watson, Michael D.; Shaughnessy, Ray

    2012-01-01

    In support of future deep space manned missions, an autonomous/automated vehicle, providing crew autonomy and an autonomous response planning system, will be required due to the light time delays in communication. Vehicle capabilities as a whole must provide for tactical response to vehicle system failures and space environmental effects induced failures, for risk mitigation of permanent loss of communication with Earth, and for assured crew return capabilities. The complexity of human rated space systems and the limited crew sizes and crew skills mix drive the need for a robust autonomous capability on-board the vehicle. The HAL 9000 Space Operating System[2] designed for such missions and space craft includes the first distributed real-time planning / re-planning system. This paper will detail the software architecture of the multiple planning engine system, and the interface design for plan changes, approval and implementation that is performed autonomously. Operations scenarios will be defined for analysis of the planning engines operations and its requirements for nominal / off nominal activities. An assessment of the distributed realtime re-planning system, in the defined operations environment, will be provided as well as findings as it pertains to the vehicle, crew, and mission control requirements needed for implementation.

  19. An Analysis of Current Operational Contract Support Planning Doctrine

    Science.gov (United States)

    2015-09-01

    analysis of doctrine and planning assets . The activities include interviews with various contracting and logistics professionals. F. RESEARCH...doctrine typically neglects the tangible and intangible capabilities that using OCS in missions brings to the operational and combatant commander. While... measuring the maturity of a process in practice within an organization through the issuing of surveys and measuring the responses. The model used

  20. Operations of and Future Plans for the Pierre Auger Observatory

    CERN Document Server

    Abraham, J; Aglietta, M; Aguirre, C; Ahn, E J; Allard, D; Allekotte, I; Allen, J; Alvarez-Muñiz, J; Ambrosio, M; Anchordoqui, L; Andringa, S; Anzalone, A; Aramo, C; Arganda, E; Argirò, S; Arisaka, K; Arneodo, F; Arqueros, F; Asch, T; Asorey, H; Assis, P; Aublin, J; Ave, M; Avila, G; Bäcker, T; Badagnani, D; Barber, K B; Barbosa-Ademarlaudo, F; Barroso, S L C; Baughman, B; Bauleo, P; Beatty, J J; Beau, T; Becker, B R; Becker, K H; Bellétoile, A; Bellido, J A; BenZvi, S; Bérat, C; Bernardini, P; Bertou, X; Biermann, P L; Billoir, P; Blanch-Bigas, O; Blanco, F; Bleve, C; Blümer, H; Boháčová, M; Boncioli, D; Bonifazi, C; Bonino, R; Borodai, N; Brack, J; Brogueira, P; Brown, W C; Bruijn, R; Buchholz, P; Bueno, A; Burton, R E; Busca, N G; Caballero-Mora, K S; Caramete, L; Caruso, R; Carvalho, W; Castellina, A; Catalano, O; Cazon, L; Cester, R; Chauvin, J; Chiavassa, A; Chinellato, J A; Chou, A; Chudoba, J; Chye, J; Clay, R W; Colombo, E; Conceição, R; Connolly, B; Contreras, F; Coppens, J; Cordier, A; Cotti, U; Coutu, S; Covault, C E; Creusot, A; Criss, A; Cronin, J; Curutiu, A; agoret-Campagne, S; Dallier, R; Daumiller, K; Dawson, B R; de Almeida, R M; De Domenico, M; De Donato, C; De Jong, S J; De La Vega, G; Junior, W J M de Mello; Neto, J R T de Mello; De Mitri, I; De Souza, V; de Vries, K D; Decerprit, G; Del Peral, L; Deligny, O; Della Selva, A; Fratte, C Delle; Dembinski, H; DiGiulio, C; Diaz, J C; Diep, P N; Dobrigkeit, C; D'Olivo, J C; Dong, P N; Dorofeev, A; Anjos, J C dos; Dova, M T; D'Urso, D; Dutan, I; Duvernois, M A; Engel, R; Erdmann, M; Escobar, C O; Etchegoyen, A; Luis, P Facal San; Falcke, H; Farrar, G; Fauth, A C; Fazzini, N; Ferrer, F; Ferrero, A; Fick, B; Filevich, A; Filipčič, A; Fleck, I; Fliescher, S; Fracchiolla, C E; Fraenkel, E D; Fulgione, W; Gamarra, R F; Gambetta, S; García, B; GarcíaGámez, D; Garcia-Pinto, D; Garrido, X; Gelmini, G; Gemmeke, H; Ghia, P L; Giaccari, U; Giller, M; Glass, H; Goggin, L M; Gold, M S; Golup, G; Albarracin, F Gomez; Berisso, M Gómez; Gonçalves, P; Amaral, M Gonçalves do; González, D; Gonzalez, J G; Góra, D; Gorgi, A; Gouffon, P; Gozzini, S R; Grashorn, E; Grebe, S; Grigat, M; Grillo, A F; Guardincerri, Y; Guarino, F; Guedes, G P; Gutiérrez, J; Hague, J D; Halenka, V; Hansen, P; Harari, D; Harmsma, S; Harton, J L; Haungs, A; Healy, M D; Hebbeker, T; Hebrero, G; Heck, D; Holmes, V C; Homola, P; Hörandel, J R; Horneffer, A; Hrabovský, M; Huege, T; Hussain, M; Iarlori, M; Insolia, A; Ionita, F; Italiano, A; Jiraskova, S; Kaducak, M; Kampert, K H; Karova, T; Kasper, P; Kégl, B; Keilhauer, B; Kemp, E; Kieckhafer, R M; Klages, H O; Kleifges, M; Kleinfeller, J; Knapik, R; Knapp, J; Koang, D -H; Krieger, A; Krömer, O; Kruppke-Hansen, D; Kühn, F; Kuempel, D; Kulbartz, K; Kunka, N; Kusenko, A; LaRosa, G; Lachaud, C; Lago, B L; Lautridou, P; Leão, M S A B; Lebrun, D; Lebrun, P; Lee, J; de Oliveira, M A Leigui; Lemiere, A; Letessier-Selvon, A A; Leuthold, M; Lhenry-Yvon, I; López, R; Agüera, A Lopez; Louedec, K; Bahilo, J Lozano; Lucero, A; Lyberis, H; Maccarone, M C; Macolino, C; Maldera, S; Mandat, D; Mantsch, P; Mariazzi, A G; Maris, I C; Falcon, H R Marquez; Martello, D; Bravo, O Martínez; Mathes, H J; Matthews, J; Matthews, J A J; Matthiae, G; Maurizio, D; Mazur, P O; McEwen, M; McNeil, R R; Medina-Tanco, G; Melissas, M; Melo, D; Menichetti, E; Menshikov, A; Meyhandan, R; Micheletti, M I; Miele, G; Miller, W; Miramonti, L; Mollerach, S; Monasor, M; Ragaigne, D Monnier; Montanet, F; Morales, B; Morello, C; Moreno, J C; Morris, C; Mostafá, M; Moura, C A; Müller, S; Muller, M A; Mussa, R; Navarra, G; Navarro, J L; Navas, S; Necesal, P; Nellen, L; Newman-Holmes, C; Newton, D; Nhung, P T; Nierstenhoefer, N; Nitz, D; Nosek, D; Nožka, L; Nyklicek, M; Oehlschläger, J; Olinto, A; Oliva, P; Olmos-Gilbaja, V M; Ortiz, M; Pacheco, N; Selmi-Dei, D Pakk; Palatka, M; Pallotta, J; Parente, G; Parizot, E; Parlati, S; Pastor, S; Patel, M; Paul, T; Pavlidou, V; Payet, K; Pech, M; Pȩkala, J; Pepe, I M; Perrone, L; Pesce, R; Petermann, E; Petrera, S; Petrinca, P; Petrolini, A; Petrov, Y; Petrovic, J; Pfendner, C; Piegaia, R; Pierog, T; Pimenta, M; Pinto, T; Pirronello, V; Pisanti, O; Platino, M; Pochon, J; Ponce, V H; Pontz, M; Privitera, P; Prouza, M; Quel, E J; Rautenberg, J; Ravel, O; Ravignani, D; Redondo, A; Revenu, B; Rezende, F A S; Rídky, J; Riggi, S; Risse, M; Rivière, C; Rizi, V; Robledo, C; Rodríguez, G; Martino, J Rodriguez; Rojo, J Rodriguez; Rodriguez-Cabo, I; Rodríguez-Frías, M D; Ros, G; Rosado, J; Rossler, T; Roth, M; Rouillé-d'Orfeuil, B; Roulet, E; Rovero, A C; Salamida, F; Salazar, H; Salina, G; Sánchez, F; Santander, M; Santo, C E; Santos, E M; Sarazin, F; Sarkar, S; Sato, R; Scharf, N; Scherini, V; Schieler, H; Schiffer, P; Schmidt, A; Schmidt, F; Schmidt, T; Scholten, O; Schoorlemmer, H; Schovancova, J; Schovánek, P; Schroeder, F; Schulte, S; Schüssler, F; Schuster, D; Sciutto, S J; Scuderi, M; Segreto, A; Semikoz, D; Settimo, M; Shellard, R C; Sidelnik, I; Siffert, B B; Sigl, G; Śmiałkowski, A; Šmída, R; Smith, B E; Snow, G R; Sommers, P; Sorokin, J; Spinka, H; Squartini, R; Strazzeri, E; Stutz, A; Suárez, F; Suomijärvi, T; Supanitsky, A D; Sutherland, M S; Swain, J; Szadkowski, Z; Tamashiro, A; Tamburro, A; Tarutina, T; Taşcuau, O; Tcaciuc, R; Tcherniakhovski, D; Tegolo, D; Thao, N T; Thomas, D; Ticona, R; Tiffenberg, J; Timmermans, C; Tkaczyk, W; Peixoto, C J Todero; Tomé, B; Tonachini, A; Torres, I; Travnicek, P; Tridapalli, D B; Tristram, G; Trovato, E; Tueros, M; Ulrich, R; Unger, M; Urban, M; Galicia, J F Valdés; Valiño, I; Valore, L; VandenBerg, A M; Vázquez, J R; Vázquez, R A; Veberič, D; Velarde, A; Venters, T; Verzi, V; Videla, M; Villaseñor, L; Vorobiov, S; Voyvodic, L; Wahlberg, H; Wahrlich, P; Wainberg, O; Warner, D; Watson, A A; Westerhoff, S; Whelan, B J; Wieczorek, G; Wiencke, L; Wilczyńska, B; Wilczyński, H; Wileman, C; Winnick, M G; Wu, H; Wundheiler, B; Yamamoto, T; Younk, P; Yuan, G; Yushkov, A; Zas, E; Zavrtanik, D; Zavrtanik, M; Zaw, I; Zepeda, A; Ziolkowski, M

    2009-01-01

    Technical reports on operations and features of the Pierre Auger Observatory, including ongoing and planned enhancements and the status of the future northern hemisphere portion of the Observatory. Contributions to the 31st International Cosmic Ray Conference, Lodz, Poland, July 2009.

  1. Operations of and Future Plans for the Pierre Auger Observatory

    NARCIS (Netherlands)

    The Pierre Auger Collaboration: J. Abraham, [No Value; Abreu, P.; Aglietta, M.; Aguirre, C.; Ahn, E. J.; Allard, D.; Allekotte, I.; Allen, J.; Alvarez-Muñiz, J.; Ambrosio, M.; Anchordoqui, L.; Andringa, S.; Anzalone, A.; Aramo, C.; Arganda, E.; Argirò, S.; Arisaka, K.; Arneodo, F.; Arqueros, F.; Asch, T.; Asorey, H.; Assis, P.; Aublin, J.; Ave, M.; Avila, G.; Bäcker, T.; Badagnani, D.; Barber, K. B.; Barbosa, A. F.; Barroso, S. L. C.; Baughman, B.; Bauleo, P.; Beatty, J. J.; Beau, T.; Becker, B. R.; Becker, K. H.; Bellétoile, A.; Bellido, J. A.; BenZvi, S.; Berat, C.; Bernardini, P.; Bertou, X.; Biermann, P. L.; Billoir, P.; Blanch-Bigas, O.; Blanco, F.; Bleve, C.; Blümer, H.; Boháčová, M.; Boncioli, D.; Bonifazi, C.; Bonino, R.; Borodai, N.; Brack, J.; Brogueira, P.; Brown, W. C.; Bruijn, R.; Buchholz, P.; Bueno, A.; Burton, R. E.; Busca, N. G.; Caballero-Mora, K. S.; Caramete, L.; Caruso, R.; Carvalho, W.; Castellina, A.; Catalano, O.; Cazon, L.; Cester, R.; Chauvin, J.; Chiavassa, A.; Chinellato, J. A.; Chou, A.; Chudoba, J.; Chye, J.; Clay, R. W.; Colombo, E.; Conceição, R.; Connolly, B.; Contreras, F.; Coppens, J.; Cordier, A.; Cotti, U.; Coutu, S.; Covault, C. E.; Creusot, A.; Criss, A.; Cronin, J.; Curutiu, A.; agoret-Campagne, S.; Dallier, R.; Daumiller, K.; Dawson, B. R.; de Almeida, R. M.; De Domenico, M.; De Donato, C.; de Jong, S. J.; De La Vega, G.; de Mello Junior, W. J. M.; de Mello Neto, J. R. T.; De Mitri, I.; de Souza, V.; de Vries, K.D.; Decerprit, G.; del Peral, L.; Deligny, O.; Della Selva, A.; Delle Fratte, C.; Dembinski, H.; DiGiulio, C.; Diaz, J. C.; Diep, P. N.; Dobrigkeit, C.; D'Olivo, J. C.; Dong, P. N.; Dorofeev, A.; dos Anjos, J. C.; Dova, M. T.; D'Urso, D.; Dutan, I.; DuVernois, M. A.; Engel, R.; Erdmann, M.; Escobar, C. O.; Etchegoyen, A.; Facal San Luis, P.; Falcke, H.; Farrar, G.; Fauth, A. C.; Fazzini, N.; Ferrer, F.; Ferrero, A.; Fick, B.; Filevich, A.; Filipčič, A.; Fleck, I.; Fliescher, S.; Fracchiolla, C. E.; Fraenkel, E. D.; Fulgione, W.; Gamarra, R. F.; Gambetta, S.; García, B.; GarcíaGámez, D.; Garcia-Pinto, D.; Garrido, X.; Gelmini, G.; Gemmeke, H.; Ghia, P. L.; Giaccari, U.; Giller, M.; Glass, H.; Goggin, L. M.; Gold, M. S.; Golup, G.; Gomez Albarracin, F.; Gómez Berisso, M.; Gonçalves, P.; Gonçalves do Amaral, M.; Gonzalez, D.; Gonzalez, J. G.; Góra, D.; Gorgi, A.; Gouffon, P.; Gozzini, S. R.; Grashorn, E.; Grebe, S.; Grigat, M.; Grillo, A. F.; Guardincerri, Y.; Guarino, F.; Guedes, G. P.; Gutiérrez, J.; Hague, J. D.; Halenka, V.; Hansen, P.; Harari, D.; Harmsma, S.; Harton, J. L.; Haungs, A.; Healy, M. D.; Hebbeker, T.; Hebrero, G.; Heck, D.; Holmes, V. C.; Homola, P.; Hörandel, J. R.; Horneffer, A.; Hrabovský, M.; Huege, T.; Hussain, M.; Iarlori, M.; Insolia, A.; Ionita, F.; Italiano, A.; Jiraskova, S.; Kaducak, M.; Kampert, K. H.; Karova, T.; Kasper, P.; Kégl, B.; Keilhauer, B.; Kemp, E.; Kieckhafer, R. M.; Klages, H. O.; Kleifges, M.; Kleinfeller, J.; Knapik, R.; Knapp, J.; Koang, D. -H.; Krieger, A.; Krömer, O.; Kruppke-Hansen, D.; Kuehn, F.; Kuempel, D.; Kulbartz, K.; Kunka, N.; Kusenko, A.; LaRosa, G.; Lachaud, C.; Lago, B. L.; Lautridou, P.; Leão, M. S. A. B.; Lebrun, D.; Lebrun, P.; Lee, J.; Leigui de Oliveira, M. A.; Lemiere, A.; Letessier-Selvon, A.; Leuthold, M.; Lhenry-Yvon, I.; López, R.; Lopez Agüera, A.; Louedec, K.; Lozano Bahilo, J.; Lucero, A.; Lyberis, H.; Maccarone, M. C.; Macolino, C.; Maldera, S.; Mandat, D.; Mantsch, P.; Mariazzi, A. G.; Maris, I. C.; Marquez Falcon, H. R.; Martello, D.; Martínez Bravo, O.; Mathes, H. J.; Matthews, J.; Matthews, J. A. J.; Matthiae, G.; Maurizio, D.; Mazur, P. O.; McEwen, M.; McNeil, R. R.; Medina-Tanco, G.; Melissas, M.; Melo, D.; Menichetti, E.; Menshikov, A.; Meyhandan, R.; Micheletti, M. I.; Miele, G.; Miller, W.; Miramonti, L.; Mollerach, S.; Monasor, M.; Monnier Ragaigne, D.; Montanet, F.; Morales, B.; Morello, C.; Moreno, J. C.; Morris, C.; Mostafá, M.; Moura, C. A.; Mueller, S.; Muller, M. A.; Mussa, R.; Navarra, G.; Navarro, J. L.; Navas, S.; Necesal, P.; Nellen, L.; Newman-Holmes, C.; Newton, D.; Nhung, P. T.; Nierstenhoefer, N.; Nitz, D.; Nosek, D.; Nožka, L.; Nyklicek, M.; Oehlschläger, J.; Olinto, A.; Oliva, P.; Olmos-Gilbaja, V. M.; Ortiz, M.; Pacheco, N.; Pakk Selmi-Dei, D.; Palatka, M.; Pallotta, J.; Parente, G.; Parizot, E.; Parlati, S.; Pastor, S.; Patel, M.; Paul, T.; Pavlidou, V.; Payet, K.; Pech, M.; Pȩkala, J.; Pepe, I. M.; Perrone, L.; Pesce, R.; Petermann, E.; Petrera, S.; Petrinca, P.; Petrolini, A.; Petrov, Y.; Petrovic, J.; Pfendner, C.; Piegaia, R.; Pierog, T.; Pimenta, M.; Pinto, T.; Pirronello, V.; Pisanti, O.; Platino, M.; Pochon, J.; Ponce, V. H.; Pontz, M.; Privitera, P.; Prouza, M.; Quel, E. J.; Rautenberg, J.; Ravel, O.; Ravignani, D.; Redondo, A.; Revenu, B.; Rezende, F. A. S.; Ridky, J.; Riggi, S.; Risse, M.; Rivière, C.; Rizi, V.; Robledo, C.; Rodriguez, G.; Rodriguez Martino, J.; Rodriguez Rojo, J.; Rodriguez-Cabo, I.; Rodríguez-Frías, M. D.; Ros, G.; Rosado, J.; Rossler, T.; Roth, M.; Rouillé-d'Orfeuil, B.; Roulet, E.; Rovero, A. C.; Salamida, F.; Salazar, H.; Salina, G.; Sánchez, F.; Santander, M.; Santo, C. E.; Santos, E. M.; Sarazin, F.; Sarkar, S.; Sato, R.; Scharf, N.; Scherini, V.; Schieler, H.; Schiffer, P.; Schmidt, A.; Schmidt, F.; Schmidt, T.; Scholten, O.; Schoorlemmer, H.; Schovancova, J.; Schovánek, P.; Schroeder, F.; Schulte, S.; Schüssler, F.; Schuster, D.; Sciutto, S. J.; Scuderi, M.; Segreto, A.; Semikoz, D.; Settimo, M.; Shellard, R. C.; Sidelnik, I.; Siffert, B. B.; Sigl, G.; Śmiałkowski, A.; Šmída, R.; Smith, B. E.; Snow, G. R.; Sommers, P.; Sorokin, J.; Spinka, H.; Squartini, R.; Strazzeri, E.; Stutz, A.; Suarez, F.; Suomijärvi, T.; Supanitsky, A. D.; Sutherland, M. S.; Swain, J.; Szadkowski, Z.; Tamashiro, A.; Tamburro, A.; Tarutina, T.; Taşcuau, O.; Tcaciuc, R.; Tcherniakhovski, D.; Tegolo, D.; Thao, N. T.; Thomas, D.; Ticona, R.; Tiffenberg, J.; Timmermans, C.; Tkaczyk, W.; Todero Peixoto, C. J.; Tomé, B.; Tonachini, A.; Torres, I.; Travnicek, P.; Tridapalli, D. B.; Tristram, G.; Trovato, E.; Tueros, M.; Ulrich, R.; Unger, M.; Urban, M.; Valdés Galicia, J. F.; Valiño, I.; Valore, L.; VandenBerg, A. M.; Vázquez, J. R.; Vázquez, R. A.; Veberič, D.; Velarde, A.; Venters, T.; Verzi, V.; Videla, M.; Villaseñor, L.; Vorobiov, S.; Voyvodic, L.; Wahlberg, H.; Wahrlich, P.; Wainberg, O.; Warner, D.; Watson, A. A.; Westerhoff, S.; Whelan, B. J.; Wieczorek, G.; Wiencke, L.; Wilczyńska, B.; Wilczyński, H.; Wileman, C.; Winnick, M. G.; Wu, H.; Wundheiler, B.; Yamamoto, T.; Younk, P.; Yuan, G.; Yushkov, A.; Zas, E.; Zavrtanik, D.; Zavrtanik, M.; Zaw, I.; Zepeda, A.; Ziolkowski, M.

    2009-01-01

    Technical reports on operations and features of the Pierre Auger Observatory, including ongoing and planned enhancements and the status of the future northern hemisphere portion of the Observatory. Contributions to the 31st International Cosmic Ray Conference, Lodz, Poland, July 2009.

  2. Educational Trends Shaping School Planning, Design, Construction, Funding and Operation

    Science.gov (United States)

    Stevenson, Kenneth R.

    2010-01-01

    What does the future hold for educators and facilities professionals when it comes to planning, building, funding, and operating school facilities? No one can absolutely know beforehand. However, there are many, many indicators of where public education in the United States may well be destined. These indicators take the form of already occurring…

  3. Test plans of the high temperature test operation at HTTR

    Energy Technology Data Exchange (ETDEWEB)

    Sakaba, Nariaki; Nakagawa, Shigeaki; Takada, Eiji [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment] [and others

    2003-03-01

    HTTR plans a high temperature test operation as the fifth step of the rise-to-power tests to achieve a reactor outlet coolant temperature of 950 degrees centigrade in the 2003 fiscal year. Since HTTR is the first HTGR in Japan which uses coated particle fuel as its fuel and helium gas as its coolant, it is necessary that the plan of the high temperature test operation is based on the previous rise-to-power tests with a thermal power of 30 MW and a reactor outlet coolant temperature at 850 degrees centigrade. During the high temperature test operation, reactor characteristics, reactor performances and reactor operations are confirmed for the safety and stability of operations. This report describes the evaluation result of the safety confirmations of the fuel, the control rods and the intermediate heat exchanger for the high temperature test operation. Also, problems which were identified during the previous operations are shown with their solution methods. Additionally, there is a discussion on the contents of the high temperature test operation. As a result of this study, it is shown that the HTTR can safely achieve a thermal power of 30 MW with the reactor outlet coolant temperature at 950 degrees centigrade. (author)

  4. DISARMAMENT AND DEMILITARIZATION IN THE CASPIAN SEA FROM THE VIEWPOINT OF INTERNATIONAL LAW

    OpenAIRE

    2007-01-01

    The article examines the role of international law in regulating the naval activity currently unfolding in the Caspian Sea region. In this context, the author looks at ways to limit military activity: demilitarization, neutralization, non-militarization, and so on. The conclusions he draws are based on the standards of international law and international law practice and reflect a realistic picture of the military-political processes going on in this region.

  5. Space Station assembly sequence planning - An engineering and operational challenge

    Science.gov (United States)

    Kaidy, James T.; Bastedo, William G.

    1988-01-01

    This paper discusses the Space Station assembly sequence planning and development process. It presents the planning methodologies from both historial and current perspectives. It is shown that planning the assembly sequence is a new and unique challenge and its solution requires the simultaneous satisfaction of many diverse variables and constants. The considerations which influence the development of the assembly sequence include launch vehicle integration and lift capabilities, on-orbit assembly flight operations, vehicle flight dynamics, spacecraft system capabilities and resource availability. Many of these considerations are described in this paper. In addition, the examples presented demonstrate the current process for assembly sequence planning and show many of the complex trade-offs that must be performed.

  6. Phase Zero Contracting Operations (PZCO) -- Strategic and Integrative Planning for Contingency and Expeditionary Operations

    Science.gov (United States)

    2012-05-02

    Tier Model ( TTM ) ........................... 15  A.  Credentialed Contract Planners Integrated with Operations Planners...Planners The Three-tier Model ( TTM ) was published to address the challenges inherent in contracting in complex military operations (Yoder, 2004). The...Contingency Contracting, Expeditionary Contracting, Humanitarian Aid, Disaster Relief, Advanced Planning, Three-tier Model , YTTM, APEX, JOPES, JCASO

  7. Application of reliability worth concepts in power system operational planning

    Energy Technology Data Exchange (ETDEWEB)

    Mello, J.C.O. [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Silva, A.M. Leite da [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil); Pereira, M.V.F. [Power System Research (PSR), Inc., Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This work describes the application of a new methodology for calculating total system interruption costs in power system operational planning. Some important operational aspects are discussed: chronological load curves, customer damage functions for each consumer class, maintenance scheduling and non-exponential repair times. It is also presented the calculation of the probability distribution of the system interruption cost to improve the decision making process associated with alternative operational strategies. The Brazilian Southeastern system is used to illustrate all previous applications. (author) 24 refs., 8 figs., 4 tabs.

  8. Electric Motors Maintenance Planning From Its Operating Variables

    Science.gov (United States)

    Rodrigues, Francisco; Fonseca, Inácio; Farinha, José Torres; Ferreira, Luís; Galar, Diego

    2017-09-01

    The maintenance planning corresponds to an approach that seeks to maximize the availability of equipment and, consequently, increase the levels of competitiveness of companies by increasing production times. This paper presents a maintenance planning based on operating variables (number of hours worked, duty cycles, number of revolutions) to maximizing the availability of operation of electrical motors. The reading of the operating variables and its sampling is done based on predetermined sampling cycles and subsequently is made the data analysis through time series algorithms aiming to launch work orders before reaching the variables limit values. This approach is supported by tools and technologies such as logical applications that enable a graphical user interface for access to relevant information about their Physical Asset HMI (Human Machine Interface), including the control and supervision by acquisition through SCADA (Supervisory Control And data acquisition) data, also including the communication protocols among different logical applications.

  9. Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review

    Science.gov (United States)

    Moyer, Eric

    2015-01-01

    The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.

  10. IBM PC/IX operating system evaluation plan

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Granier, Martin; Hall, Philip P.; Triantafyllopoulos, Spiros

    1984-01-01

    An evaluation plan for the IBM PC/IX Operating System designed for IBM PC/XT computers is discussed. The evaluation plan covers the areas of performance measurement and evaluation, software facilities available, man-machine interface considerations, networking, and the suitability of PC/IX as a development environment within the University of Southwestern Louisiana NASA PC Research and Development project. In order to compare and evaluate the PC/IX system, comparisons with other available UNIX-based systems are also included.

  11. Hinode/EIS science planning and operations tools

    Science.gov (United States)

    Rainnie, Jonn A.

    2016-07-01

    We present the design, implementation and maintenance of the suite of software enabling scientists to design and schedule Hinode/EIS1 operations. The total of this software is the EIS Science Planning Tools (EISPT), and is predominately written in IDL (Interactive Data Language), coupled with SolarSoft (SSW), an IDL library developed for solar missions. Hinode is a multi-instrument and wavelength mission designed to observe the Sun. It is a joint Japan/UK/US consortium (with ESA and Norwegian involvement). Launched in September 2006, its principal scientific goals are to study the Sun's variability and the causes of solar activity. Hinode operations are coordinated at ISAS (Tokyo, Japan). A daily Science Operations meeting is attended by the instrument teams and the spacecraft team. Nominally, science plan uploads cover periods of two or three days. When the forthcoming operations have been agreed, the necessary spacecraft operations parameters are created. These include scheduling for spacecraft pointing and ground stations. The Extreme UV Imaging Spectrometer (EIS) instrument, led by the UK (the PI institute is MSSL), is designed to observe the emission spectral lines of the solar atmosphere. Observations are composed of reusable, hierarchical components, including lines lists (wavelengths of spectral lines), rasters (exposure times, line list, etc.) and studies (defines one or more rasters). Studies are the basic unit of "timeline" scheduling. They are a useful construct for generating more complex sequences of observations, reducing the planning burden. Instrument observations must first be validated. An initial requirement was that operations be shared equally by the 3 main EIS teams (Japan, UK and US). Hence, a major design focus of the software was "Remote Operations", whereby any scientist in any location can run the software, schedule a science plan and send it to the spacecraft commanding team. It would then be validated and combined with the science

  12. Operations planning for agricultural harvesters using ant colony optimization

    Directory of Open Access Journals (Sweden)

    A. Bakhtiari

    2013-07-01

    Full Text Available An approach based on ant colony optimization for the generation for optimal field coverage plans for the harvesting operations using the optimal track sequence principle B-patterns was presented. The case where the harvester unloads to a stationary facility located out of the field area, or in the field boundary, was examined. In this operation type there are capacity constraints to the load that a primary unit, or a harvester in this specific case, can carry and consequently, it is not able to complete the task of harvesting a field area and therefore it has to leave the field area, to unload, and return to continue the task one or more times. Results from comparing the optimal plans with conventional plans generated by operators show reductions in the in-field nonworking distance in the range of 19.3-42.1% while the savings in the total non-working distance were in the range of 18-43.8%. These savings provide a high potential for the implementation of the ant colony optimization approach for the case of harvesting operations that are not supported by transport carts for the out-of-the-field removal of the crops, a practice case that is normally followed in developing countries, due to lack of resources.

  13. The use of thermal desorption in monitoring for the chemical weapons demilitarization program.

    Science.gov (United States)

    Harper, Martin

    2002-10-01

    Under international treaty, the United States and Russia are disposing of their aging stockpile of chemical weapons. Incineration and chemical neutralization are options for sites in the United States, although Russia prefers the latter. The storage and disposal of bulk and chemical agents and weapons involve unique hazards of handling extremely toxic materials. There are three major areas of concern--the storage stockpile, the disposal area, and the discovery and destruction of "found" material not considered part of the stockpile. Methods have been developed to detect the presence of chemical agents in the air, and these are used to help assure worker protection and the safety of the local population. Exposure limits for all chemical agents are low, sometimes nanograms per cubic meter for worker control limits and picograms per cubic meter for general population limits. There are three types of monitoring used in the USA: alarm, confirmation, and historical. Alarm monitors are required to give relatively immediate real-time responses to agent leaks. They are simple to operate and rugged, and provide an alarm in near real-time (generally a few minutes). Alarm monitors for the demilitarization program are based on sorbent pre-concentration followed by thermal desorption and simple gas chromatography. Alarms may need to be confirmed by another method, such as sample tubes collocated with the alarm monitor and analyzed in a laboratory by more sophisticated chromatography. Sample tubes are also used for historical perimeter monitoring, with sample periods typically of 12 h. The most common detector is the flame photometric detector, in sulfur or phosphorous mode, although others, such as mass-selective detectors, also have been used. All agents have specific problems with collection, chromatography and detection. Monitoring is not made easier by interferences from pesticide spraying, busy roadways or military firing ranges. Exposure limits drive the requirements for

  14. Orbital Express Mission Operations Planning and Resource Management using ASPEN

    Science.gov (United States)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Danny

    2008-01-01

    The Orbital Express satellite servicing demonstrator program is a DARPA program aimed at developing "a safe and cost-effective approach to autonomously service satellites in orbit". The system consists of: a) the Autonomous Space Transport Robotic Operations (ASTRO) vehicle, under development by Boeing Integrated Defense Systems, and b) a prototype modular next-generation serviceable satellite, NEXTSat, being developed by Ball Aerospace. Flexibility of ASPEN: a) Accommodate changes to procedures; b) Accommodate changes to daily losses and gains; c) Responsive re-planning; and d) Critical to success of mission planning Auto-Generation of activity models: a) Created plans quickly; b) Repetition/Re-use of models each day; and c) Guarantees the AML syntax. One SRP per day vs. Tactical team

  15. The optimization of operating parameters on microalgae upscaling process planning.

    Science.gov (United States)

    Ma, Yu-An; Huang, Hsin-Fu; Yu, Chung-Chyi

    2016-03-01

    The upscaling process planning developed in this study primarily involved optimizing operating parameters, i.e., dilution ratios, during process designs. Minimal variable cost was used as an indicator for selecting the optimal combination of dilution ratios. The upper and lower mean confidence intervals obtained from the actual cultured cell density data were used as the final cell density stability indicator after the operating parameters or dilution ratios were selected. The process planning method and results were demonstrated through three case studies of batch culture simulation. They are (1) final objective cell densities were adjusted, (2) high and low light intensities were used for intermediate-scale cultures, and (3) the number of culture days was expressed as integers for the intermediate-scale culture.

  16. GIS Methodology for Planning Planetary-Rover Operations

    Science.gov (United States)

    Powell, Mark; Norris, Jeffrey; Fox, Jason; Rabe, Kenneth; Shu, I-Hsiang

    2007-01-01

    A document describes a methodology for utilizing image data downlinked from cameras aboard a robotic ground vehicle (rover) on a remote planet for analyzing and planning operations of the vehicle and of any associated spacecraft. Traditionally, the cataloging and presentation of large numbers of downlinked planetary-exploration images have been done by use of two organizational methods: temporal organization and correlation between activity plans and images. In contrast, the present methodology involves spatial indexing of image data by use of the computational discipline of geographic information systems (GIS), which has been maturing in terrestrial applications for decades, but, until now, has not been widely used in support of exploration of remote planets. The use of GIS to catalog data products for analysis is intended to increase efficiency and effectiveness in planning rover operations, just as GIS has proven to be a source of powerful computational tools in such terrestrial endeavors as law enforcement, military strategic planning, surveying, political science, and epidemiology. The use of GIS also satisfies the need for a map-based user interface that is intuitive to rover-activity planners, many of whom are deeply familiar with maps and know how to use them effectively in field geology.

  17. Microgrids and distributed generation systems: Control, operation, coordination and planning

    Science.gov (United States)

    Che, Liang

    Distributed Energy Resources (DERs) which include distributed generations (DGs), distributed energy storage systems, and adjustable loads are key components in microgrid operations. A microgrid is a small electric power system integrated with on-site DERs to serve all or some portion of the local load and connected to the utility grid through the point of common coupling (PCC). Microgrids can operate in both grid-connected mode and island mode. The structure and components of hierarchical control for a microgrid at Illinois Institute of Technology (IIT) are discussed and analyzed. Case studies would address the reliable and economic operation of IIT microgrid. The simulation results of IIT microgrid operation demonstrate that the hierarchical control and the coordination strategy of distributed energy resources (DERs) is an effective way of optimizing the economic operation and the reliability of microgrids. The benefits and challenges of DC microgrids are addressed with a DC model for the IIT microgrid. We presented the hierarchical control strategy including the primary, secondary, and tertiary controls for economic operation and the resilience of a DC microgrid. The simulation results verify that the proposed coordinated strategy is an effective way of ensuring the resilient response of DC microgrids to emergencies and optimizing their economic operation at steady state. The concept and prototype of a community microgrid that interconnecting multiple microgrids in a community are proposed. Two works are conducted. For the coordination, novel three-level hierarchical coordination strategy to coordinate the optimal power exchanges among neighboring microgrids is proposed. For the planning, a multi-microgrid interconnection planning framework using probabilistic minimal cut-set (MCS) based iterative methodology is proposed for enhancing the economic, resilience, and reliability signals in multi-microgrid operations. The implementation of high-reliability microgrids

  18. Planning Bepicolombo MPO Science Operations to study Mercury Interior

    Science.gov (United States)

    De La Fuente, Sara; Carasa, Angela; Ortiz, Iñaki; Rodriguez, Pedro; Casale, Mauro; Benkhoff, Johannes; Zender, Joe

    2017-04-01

    BepiColombo is an Interdisciplinary Cornerstone ESA-JAXA Mission to Mercury, with two orbiters, the ESA Mercury Planetary Orbiter (MPO) and the JAXA Mercury Magnetospheric Orbiter (MMO) dedicated to study of the planet and its magnetosphere. The MPO, is a three-axis-stabilized, nadir-pointing spacecraft which will be placed in a polar orbit, providing excellent spatial resolution over the entire planet surface. The MPO's scientific payload comprises 11 instrument packages, including laser altimeter, cameras and the radio science experiment that will be dedicated to the study of Mercury's interior: structure, composition, formation and evolution. The planning of the science operations to be carried out by the Mercury's interior scientific instruments will be done by the SGS located at the European Space Astronomy Centre (ESAC), in conjunction with the scientific instrument teams. The process will always consider the complete nominal mission duration, such that the contribution of the scheduled science operations to the science objectives, the total data volume generated, and the seasonal interdependency, can be tracked. The heart of the science operations planning process is the Observations Catalogue (OC), a web-accessed database to collect and analyse all science operations requests. From the OC, the SGS will first determine all science opportunity windows compatible with the spacecraft operational constraints. Secondly, only those compatible with the resources (power and data volume) and pointing constraints will be chosen, including slew feasibility.

  19. Detailed Fishery Operating Plan with 1985 Operating Criteria, 1985 Annual Publication.

    Energy Technology Data Exchange (ETDEWEB)

    Karr, Malcolm H.

    1985-03-31

    This plan (DFOP) is designed as a working document to guide decisions and actions for achieving Columbia Basin Fish and Wildlife Program measures and fishery objectives to improve the survival of migrant salmon and steelhead. The DFOP outlines current fishery objectives, research findings, and systems operational constraints in the Columbia River Basin. Together, program measures, fishery objectives, research findings, and system constraints form the foundation for the project specific operations recommendations in the DFOP.

  20. Science observation and operation plans of BepiColombo MMO

    Science.gov (United States)

    Murakami, Go; Fujimoto, Masaki

    2016-04-01

    BepiColombo is an ESA-JAXA joint mission to Mercury with the aim to understand the process of planetary formation and evolution as well as to understand similarities and differences between the magnetospheres of Mercury and Earth. The baseline mission consists of two spacecraft, i.e. the Mercury Planetary Orbiter (MPO) and the Mercury Magnetospheric Orbiter (MMO). The two orbiters will be launched in 2017 by an Ariane-5 and arrive at Mercury in 2024. JAXA is responsible for the development and operations of MMO, while ESA is responsible for the development and operations of MPO as well as the launch, transport, and the insertion of two spacecraft into their dedicated orbits. Being a spin-stabilized spacecraft, MMO has much less constraint for plasma observations and is expected to extract essential elements of space plasma physics that become visible in the Hermean environment. However, MMO has large constraints on science operations, such as thermal issue and limited telemetry rate. Due to the thermal issue each science instrument cannot always be turned on. In addition, due to the low telemetry rate in average, only a part (~20-30%) of science mission data with high resolution can be downlinked. Therefore, in order to maximize the scientific results and outcomes to be achieved by MMO, we must optimize the science observation and downlink plans in detail. In this paper, we summarize the basic plans and strategies of MMO science operations.

  1. Hazardous-waste analysis plan for LLNL operations

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, R.S.

    1982-02-12

    The Lawrence Livermore National Laboratory is involved in many facets of research ranging from nuclear weapons research to advanced Biomedical studies. Approximately 80% of all programs at LLNL generate hazardous waste in one form or another. Aside from producing waste from industrial type operations (oils, solvents, bottom sludges, etc.) many unique and toxic wastes are generated such as phosgene, dioxin (TCDD), radioactive wastes and high explosives. One key to any successful waste management program must address the following: proper identification of the waste, safe handling procedures and proper storage containers and areas. This section of the Waste Management Plan will address methodologies used for the Analysis of Hazardous Waste. In addition to the wastes defined in 40 CFR 261, LLNL and Site 300 also generate radioactive waste not specifically covered by RCRA. However, for completeness, the Waste Analysis Plan will address all hazardous waste.

  2. Runway Operations Planning: A Two-Stage Heuristic Algorithm

    Science.gov (United States)

    Anagnostakis, Ioannis; Clarke, John-Paul

    2003-01-01

    The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, can also be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. This paper introduces a two stage heuristic algorithm for solving the Runway Operations Planning (ROP) problem. In the first stage, sequences of departure class slots and runway crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the departure class slots are populated with specific flights from the pool of available aircraft, by solving an integer program with a Branch & Bound algorithm implementation. Preliminary results from this implementation of the two-stage algorithm on real-world traffic data are presented.

  3. Decision support for simulation-based operation planning

    Science.gov (United States)

    Schubert, Johan; Hörling, Pontus

    2016-05-01

    In this paper, we develop methods for analyzing large amounts of data from a military ground combat simulation system. Through a series of processes, we focus the big data set on situations that correspond to important questions and show advantageous outcomes. The result is a decision support methodology that provides commanders with results that answer specific questions of interest, such as what the consequences for the Blue side are in various Red scenarios or what a particular Blue force can withstand. This approach is a step toward taking the traditional data farming methodology from its analytical view into a prescriptive operation planning context and a decision making mode.

  4. Operational Planning Tools for U.S. Navy Maritime Commanders

    OpenAIRE

    Gerald G. Brown; Carlyle, Matthew W.; Kelton, David; Kline, Jeffrey; Salmeron, Javier

    2009-01-01

    Brown, G., Carlyle, W.M., Kelton, D., Kline, J. and Salmerón, J., 2009, “Operational Planning Tools for U.S. Navy Maritime Commanders,” in refereed conference proceedings of International Conference on Harbor, Maritime and Multimodal Logistics Modeling and Simulation, Bruzzone, A., Cunha, G. Martínez, R. and Merkuryev, Y., eds., Universidad de La Laguna, Tenerife, Spain. ISBN 978-84-692-5416-5. This work presents recent research to develop a series of optimization- and simulation-based dec...

  5. Low-temperature thermal energy storage program annual operating plan

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, H. W.; Eissenberg, D. M.

    1979-01-01

    The LTTES program operating plans for FY 1978 are described in terms of general program objectives and the technical activities being implemented to achieve these objectives. The program structure provides emphasis on several principal thrusts; namely, seasonal thermal storage, daily/short-term thermal storage, and waste heat recovery and reuse. A work breakdown structure (WBS) organizes the efforts being carried out in-house or through subcontract within each thrust area. Fiscal data are summarized in respect to thrust area, individual efforts, and funding source.

  6. HEMP emergency planning and operating procedures for electric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. (Electrotek Concepts, Inc., Knoxville, TN (United States))

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  7. HEMP emergency planning and operating procedures for electric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. (Electrotek Concepts, Inc., Knoxville, TN (United States))

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  8. Planning Pharmacies: An Operational Method to Find the Best Location

    Directory of Open Access Journals (Sweden)

    Simona Tondelli

    2014-05-01

    Full Text Available The theme of the spatial distribution of the pharmacies on the territory is closely connected to urban planning and to services supply. In Italy, the regulatory change that took place in 2012, triggered partly by the need to adhere more to a constantly changing economic system, has led to a revision of the existing situation, consisting both on the method to quantify the pharmacies distribution and on the efficiency of the service. If Law 27/2012 has effectively allowed municipalities to increase the number of pharmacies that they can settle on the municipal territory, it has also started a process of rethinking the logic of pharmacies location and of their catchment areas. In this framework, the present paper aims to discuss the merits of a regulatory evolutions that sparked the process of liberalization of locations, integrating the law guidelines and goals with an operating logic process, usable and useful to translate goals into planning actions in a continuous dialogue between law and territory, constraints and opportunities, equity and accessibility of the care services. Following this logic operations, we have investigated the urban context of Castelfranco Emilia, assuming the location of new offices on the basis of pharmaceutical analyzes.

  9. 36 CFR 9.40 - Supplementation or revision of plan of operations.

    Science.gov (United States)

    2010-07-01

    ... of plan of operations. 9.40 Section 9.40 Parks, Forests, and Public Property NATIONAL PARK SERVICE... revision of plan of operations. (a) A proposal to supplement or revise an approved plan of operations may... to address conditions not previously contemplated by notifying the appropriate party in writing...

  10. The Operation “Big Saturn”: Plan and Implementation Opportunities

    Directory of Open Access Journals (Sweden)

    Ochirov Utash Borisovich

    2015-11-01

    Full Text Available The article analyzes the plan of one of the most important operations of a radical turning point in the course of the Great Patriotic War. Initially, the plan, conceived as the development of Operation “Uranus” and resulted in the encirclement of the 6th Army headed by Field Marshall Paulus at Stalingrad, was called “Saturn”. However, after creating a shortened version of the name “Small Saturn”, it was called “Big Saturn”. The main purpose of “Saturn” was to conduct the strategic offensive with the help of four or five armies from middle Don and Chir towards Rostov-on-Don to withdraw the enemy Army Group “Don” and Army Group “A” from the Caucasus. The enemy army groups consisted of almost a third of the units of the Wehrmacht and its allies, who fought against the Soviet Union and their defeat or delay on the Taman Peninsula where there was no port capacity for rapid evacuation of such a large group of people, equipment and supplies, could significantly change the balance of forces on the Eastern front. Unfortunately, the Сhief of the General Staff of the Red Army Alexander Vasilevsky, who was initially in charge of the “Saturn” operation as the representative of Stavka (General Headquarters, was appointed by Stalin in late November as a coordinator of the Soviet troops, achieving the encirclement of the surrounded Paulus’s grouping. Vasilevsky, using his authority, managed to transfer a significant part of the strategic reserves from the middle Don direction firstly to the Stalingrad direction and then to the Kotelnikovsky direction against unlocking grouping of Manstein. The analysis of the forces of the Stalingrad Front, given in the article, shows that there were enough troops to repulse an attack. The transferred strategic reserves proved to be redundant, and their offensive on Rostov failed, while their usage according to the plan “Saturn” would have led to undeniable success. As a result, Manstein

  11. Proceedings: Demilitarization and Disposal Technology Conference (2nd) Held at Salt Lake City, Utah on April 24, 25, 26, 1979,

    Science.gov (United States)

    1979-04-01

    flocculation of suspended solids into a lagoon; (b) incineration of other waste not suitable for treatment in (a); and (c) collection of WP waste...demilitarization at Johnston Island. * Another monitor that was employed to a small extent at Johnston Island was tomato plants. Since tomato plants are very

  12. CFD SIMULATION FOR DEMILITARIZATION OF RDX IN A ROTARY KILN BY THERMAL DECOMPOSITION

    Directory of Open Access Journals (Sweden)

    SI H. LEE

    2017-06-01

    Full Text Available Demilitarization requires the recovery and disposal of obsolete ammunition and explosives. Since open burning/detonation of hazardous waste has caused serious environmental and safety problems, thermal decomposition has emerged as one of the most feasible methods. RDX is widely used as a military explosive due to its high melting temperature and detonation power. In this work, the feasible conditions under which explosives can be safely incinerated have been investigated via a rotary kiln simulation. To solve this problem, phase change along with the reactions of RDX has been incisively analyzed. A global reaction mechanism consisting of condensed phase and gas phase reactions are used in Computational Fluid Dynamics simulation. User Defined Functions in FLUENT is utilized in this study to inculcate the reactions and phase change into the simulation. The results divulge the effect of temperature and the varying amounts of gas produced in the rotary kiln during the thermal decomposition of RDX. The result leads to the prospect of demilitarizing waste explosives to avoid the possibility of detonation.

  13. Implementing Strategic Planning Capabilities Within the Mars Relay Operations Service

    Science.gov (United States)

    Hy, Franklin; Gladden, Roy; Allard, Dan; Wallick, Michael

    2011-01-01

    Since the Mars Exploration Rovers (MER), Spirit and Opportunity, began their travels across the Martian surface in January of 2004, orbiting spacecraft such as the Mars 2001 Odyssey orbiter have relayed the majority of their collected scientific and operational data to and from Earth. From the beginning of those missions, it was evident that using orbiters to relay data to and from the surface of Mars was a vastly more efficient communications strategy in terms of power consumption and bandwidth compared to direct-to-Earth means. However, the coordination between the various spacecraft, which are largely managed independently and on differing commanding timelines, has always proven to be a challenge. Until recently, the ground operators of all these spacecraft have coordinated the movement of data through this network using a collection of ad hoc human interfaces and various, independent software tools. The Mars Relay Operations Service (MaROS) has been developed to manage the evolving needs of the Mars relay network, and specifically to standardize and integrate the relay planning and coordination data into a centralized infrastructure. This paper explores the journey of developing the MaROS system, from inception to delivery and acceptance by the Mars mission users.

  14. Implementing Strategic Planning Capabilities Within the Mars Relay Operations Service

    Science.gov (United States)

    Hy, Franklin; Gladden, Roy; Allard, Dan; Wallick, Michael

    2011-01-01

    Since the Mars Exploration Rovers (MER), Spirit and Opportunity, began their travels across the Martian surface in January of 2004, orbiting spacecraft such as the Mars 2001 Odyssey orbiter have relayed the majority of their collected scientific and operational data to and from Earth. From the beginning of those missions, it was evident that using orbiters to relay data to and from the surface of Mars was a vastly more efficient communications strategy in terms of power consumption and bandwidth compared to direct-to-Earth means. However, the coordination between the various spacecraft, which are largely managed independently and on differing commanding timelines, has always proven to be a challenge. Until recently, the ground operators of all these spacecraft have coordinated the movement of data through this network using a collection of ad hoc human interfaces and various, independent software tools. The Mars Relay Operations Service (MaROS) has been developed to manage the evolving needs of the Mars relay network, and specifically to standardize and integrate the relay planning and coordination data into a centralized infrastructure. This paper explores the journey of developing the MaROS system, from inception to delivery and acceptance by the Mars mission users.

  15. Implementation plan for WRAP Module 1 operational readiness review

    Energy Technology Data Exchange (ETDEWEB)

    Irons, L.G.

    1994-11-04

    The Waste Receiving and Processing Module 1 (WRAP 1) will be used to receive, sample, treat, and ship contact-handled (CH) transuranic (TRU), low-level waste (LLW), and low-level mixed waste (LLMW) to storage and disposal sites both on the Hanford site and off-site. The primary mission of WRAP 1 is to characterize and certify CH waste in 55-gallon and 85-gallon drums; and its secondary function is to certify CH waste standard waste boxes (SWB) and boxes of similar size for disposal. The WRAP 1 will provide the capability for examination (including x-ray, visual, and contents sampling), limited treatment, repackaging, and certification of CH suspect-TRU waste in 55-gallon drums retrieved from storage, as well as newly generated CH LLW and CH TRU waste drums. The WRAP 1 will also provide examination (X-ray and visual only) and certification of CH LLW and CH TRU waste in small boxes. The decision to perform an Operational Readiness Review (ORR) was made in accordance with WHC-CM-5-34, Solid Waste Disposal Operations Administration, Section 1.4, Operational Readiness Activities. The ORR will ensure plant and equipment readiness, management and personnel readiness, and management programs readiness for the initial startup of the facility. This implementation plan is provided for defining the conduct of the WHC ORR.

  16. Screening family planning needs: an operations research project in Guatemala

    Directory of Open Access Journals (Sweden)

    Burkhart Marianne

    2004-05-01

    Full Text Available Abstract Background Public sector health care providers in rural Guatemala have infrequently offered family planning information and services in routine visits. This operations research project tested a strategy to modify certain practices that prevent health workers from proactively screening clients' needs and meeting them. Methods The research design was quasi-experimental with a pretest-posttest-follow-up comparison group design. Health districts, which comprise health centers and posts, were purposively assigned to intervention or comparison groups to assure comparability of the two groups. The strategy was based on a job-aid designed to guide health workers in screening clients' reproductive intentions and family planning needs, help them to offer contraceptive methods if the woman expressed interest, and facilitate the provision of the method chosen at the time of the visit. The strategy was implemented at intervention sites during a period of six months. Upon completion of post-intervention measurements, the strategy was scaled up to the comparison sites, and a follow-up assessment was conducted nine months later. Results were evaluated by conducting three rounds of exit interviews with women exposed to the risk of unwanted pregnancy. Results Study results showed a two to five-fold increase in providers' screening of clients' reproductive intentions. The proportion of clients who received information about contraceptives increased from 8% at the baseline to 42% immediately post-intervention, and 36% at the follow-up survey. The intervention also proved successful in improving the role service providers play in offering women a chance to ask questions and assisting women in making a selection. The proportion of women who received a method, referral or appointment increased and remained high in the intervention group, although no change was seen in the comparison group after their participation in the strategy. Conclusion The easy

  17. Wind farm operation planning using optimal pitch angle pattern (OPAP)

    Energy Technology Data Exchange (ETDEWEB)

    Moskalenko, Natalia S.; Rudion, K. [Magdeburg Univ. (Germany). Chair for Electric Power Networks and Renewable Energy Sources

    2011-07-01

    This paper presents the possibilities of optimal operation planning to maximize the energy production from a wind farm based on optimal pitch angle pattern (OPAP). The current status of this work is to investigate the influence of the pitch angle adaptation of single wind turbines (WTs) on the overall energy yield of the farm. The approach proposed in this paper assumes a selective change of the pitch angle of the chosen WTs from the optimal value, which corresponds to the maximal utilization of kinetic energy from the wind flow, in order to minimize wake effect influence on the overall energy yield of the farm. In this paper the fundamental assumptions of the proposed approach will be specified and the calculation algorithm will be presented. Furthermore, an exemplary test system will be defined and chosen scenarios will be calculated in order to show the potentials of the OPAP method. (orig.)

  18. The (de)Militarization of Humanitarian Aid: A Historical Perspective

    OpenAIRE

    2014-01-01

    Humanitarian workers often complain that international aid to victims of armed conflicts is more and more militarized because relief organizations are embedded into peacekeeping operations, used as a "force multiplier", or manipulated as an instrument of diplomacy by proxy. Historically, however, charity has always been a military issue in times of war. We can distinguish four types of militarization of relief organizations in this regard. First is the use of charities to make "war by proxy",...

  19. A discussion of regulatory requirements and air dispersion modeling approaches applicable to U.S. chemical demilitarization facilities.

    Science.gov (United States)

    Higgins, B W; Robbins, L B; Litynski, J

    1998-09-01

    Owners of hazardous waste treatment, storage, and disposal facilities, and certain major air pollution sources, must conduct several separate ambient air dispersion modeling analyses before beginning construction of new facilities or modifying existing facilities. These analyses are critical components of the environmental permitting and facility certification processes and must be completed to the satisfaction of federal, state, and local regulatory authorities. The U.S. Army has conducted air dispersion modeling for its proposed chemical agent disposal facilities to fulfill the following environmental regulatory and risk management requirements: (1) Resource Conservation and Recovery Act human health and ecological risk assessment analysis for the hazardous waste treatment and storage permit applications, (2) Quantitative Risk Assessment to support the site-specific risk management programs, and (3) Prevention of Significant Deterioration ambient air impact analysis for the air permit applications. The purpose of these air dispersion modeling studies is to show that the potential impacts on human health and the environment, due to operation of the chemical agent disposal facilities, are acceptable. This paper describes and compares the types of air dispersion models, modeling input data requirements, modeling algorithms, and approaches used to satisfy the three environmental regulatory and risk management requirements listed above. Although this paper discusses only one industry (i.e., chemical demilitarization), the information it contains could help those in other industries who need to communicate to the public the purpose and objectives of each modeling analysis. It may also be useful in integrating the results of each analysis into an overarching summary of compliance and potential risks.

  20. Savannah River Reactor Operation: Indices of risk for emergency planning

    Energy Technology Data Exchange (ETDEWEB)

    O' Kula, K.R.; East, J.M.

    1990-10-01

    Periodically it is necessary to re-examine the implications of new source terms for neighboring offsite populations as Probabilistic Risk Assessment (PRA) and Severe Accident studies mature, and lead to a better understanding of the progression of hypothetical core melt accidents in the Savannah River Site (SRS) reactors. In this application multiple-system failure, low-frequency events, and consequently higher radiological source terms than from normal operation or design basis accidents (DBAs) are considered. Measures of consequence such as constant dose vs distance, boundary doses, and health effects to close-in populations are usually examined in this context. A set of source terms developed for the Safety Information Document (SID) for support of the Reactor Operation Environmental Impact Statement (EIS) forms the basis for the revised risk evaluation discussed herein. The intent of this review is not to completely substantiate the sufficiency of the current Emergency Planning Zone (EPZ). However, the two principal measures (200-rem red-bone marrow dose vs distance and 300-rem thyroid dose vs distance) for setting an EPZ are considered. Additional dose-at-distance calculations and consideration of DBA doses would be needed to complete a re-evaluation of the current EPZ. These subject areas are not addressed in the current document. Also, this report evaluates the sensitivity of individual risk estimates to the extent of offsite evacuation assumed from a K reactor severe accident and compares these risks to the Draft DOE Safety Guidelines. 14 refs., 8 figs., 4 tabs.

  1. 30 CFR 250.111 - Who oversees operations under my welding plan?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Who oversees operations under my welding plan... § 250.111 Who oversees operations under my welding plan? A welding supervisor or a designated person in charge must be thoroughly familiar with your welding plan. This person must ensure that each welder...

  2. Operation REDWING Commander Task Group 7.3, Operation Plan Number 1-56.

    Science.gov (United States)

    1956-01-24

    9 Decoder 1955 indicates for each unit a two digit numbal which is to be appended to the designation SNF in order to identify the ship _ or unit for...Center) XWAJALEIN D-3_ Annex D to OTG 7.3 No -1-56 SEARCH AND RESCUE PLAN b. Comunications . An specified in reference (b) and Annex E of this-Operation...satisfactory comunications should be employed to transmit CONFIDENTIAL traffic when necessary to transmit visually in the clear. a, Vessels having three or

  3. The (deMilitarization of Humanitarian Aid: A Historical Perspective

    Directory of Open Access Journals (Sweden)

    Marc-Antoine Pérouse de Montclos

    2014-06-01

    Full Text Available Humanitarian workers often complain that international aid to victims of armed conflicts is more and more militarized because relief organizations are embedded into peacekeeping operations, used as a “force multiplier”, or manipulated as an instrument of diplomacy by proxy. Historically, however, charity has always been a military issue in times of war. We can distinguish four types of militarization of relief organizations in this regard. First is the use of charities to make “war by proxy”, as in Afghanistan or Nicaragua in the 1980s. The second pattern is “embedment”, like the Red Cross during the two world wars. The third is “self-defense”, as with the Order of Saint John of Jerusalem (now Malta in the 12th Century. The fourth, finally, is the model of “International Brigades” alongside the Spanish Republicans in 1936 or various liberation movements in the 1970s. In comparison, humanitarian aid today appears to be much less militarized. However, this perception also depends on the various definitions of the word “humanitarian”.

  4. Burns Interagency Fire Zone : Fire Danger Operating and Preparedness Plan 2010

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This is the Fire Danger Operating and Preparedness Plan for the Burns Interagency Fire Zone. This plan provides a method to calculate the preparedness and dispatch...

  5. Replanning Using Hierarchical Task Network and Operator-Based Planning

    Science.gov (United States)

    Wang, X.; Chien, S.

    1997-01-01

    In order to scale-up to real-world problems, planning systems must be able to replan in order to deal with changes in problem context. In this paper we describe hierarchical task network and operatorbased re-planning techniques which allow adaptation of a previous plan to account for problems associated with executing plans in real-world domains with uncertainty, concurrency, changing objectives.

  6. Gas Hydrate Research Site Selection and Operational Research Plans

    Science.gov (United States)

    Collett, T. S.; Boswell, R. M.

    2009-12-01

    In recent years it has become generally accepted that gas hydrates represent a potential important future energy resource, a significant drilling and production hazard, a potential contributor to global climate change, and a controlling factor in seafloor stability and landslides. Research drilling and coring programs carried out by the Ocean Drilling Program (ODP), the Integrated Ocean Drilling Program (IODP), government agencies, and several consortia have contributed greatly to our understanding of the geologic controls on the occurrence of gas hydrates in marine and permafrost environments. For the most part, each of these field projects were built on the lessons learned from the projects that have gone before them. One of the most important factors contributing to the success of some of the more notable gas hydrate field projects has been the close alignment of project goals with the processes used to select the drill sites and to develop the project’s operational research plans. For example, IODP Expedition 311 used a transect approach to successfully constrain the overall occurrence of gas hydrate within the range of geologic environments within a marine accretionary complex. Earlier gas hydrate research drilling, including IODP Leg 164, were designed primarily to assess the occurrence and nature of marine gas hydrate systems, and relied largely on the presence of anomalous seismic features, including bottom-simulating reflectors and “blanking zones”. While these projects were extremely successful, expeditions today are being increasingly mounted with the primary goal of prospecting for potential gas hydrate production targets, and site selection processes designed to specifically seek out anomalously high-concentrations of gas hydrate are needed. This approach was best demonstrated in a recently completed energy resource focused project, the Gulf of Mexico Gas Hydrate Joint Industry Project Leg II (GOM JIP Leg II), which featured the collection of a

  7. 77 FR 31499 - Approval and Promulgation of Implementation Plans and Operating Permits Program; Commonwealth of...

    Science.gov (United States)

    2012-05-29

    ... Program; Commonwealth of Puerto Rico; Administrative Changes AGENCY: Environmental Protection Agency (EPA... clarity of the rules contained in the Commonwealth's Implementation Plan and Operating Permits Program...

  8. Preoperative planning and designing of a fluorocompatible endourology operating room.

    Science.gov (United States)

    Sabnis, Ravindra B; Mishra, Shashikant; Sharma, Rajan; Desai, Mahesh R

    2009-10-01

    A dedicated fluoroscopic-compatible operating room (OR) for endourologic procedures, such as percutaneous nephrolithotomy and ureteroscopy, is structurally and functionally different from the general OR. Publications with practical details are scarce, imposing a challenge in construction of such an OR. We outline a practical approach for the design and construction of a modern flourocompatible endourology OR. There were no publications related to a dedicated endourology OR in Medline. A search was then performed for English language articles on OR designing, fluoroscopy in the OR, data archiving, and data relay. We also surveyed the existing endourology OR in different hospitals and analyzed the available technology for audiovisual capture and relay in surgery. This article was then prepared, covering the relevant areas on designing a dedicated flourocompatible endourology OR. Close cooperation and interaction between an architect and expert construction manager for designing, development, and construction of an OR are necessary. Strategic equipment placement with booms is essential to increase the efficiency and safety within the surgical space. Distinct features of an endourology OR are thickness of the walls for radiation protection, wide OR gate, central floor water exit drain, flourocompatible rotatable OR table, C-arm unit, minimum three hanging thin-film transistor (TFT) screen monitors, and endoscopic equipment supported on a boom. The anesthetic boom should be retractable and movable from one end of the OR table to other. The OR should have an electronic workstation strategically located at one corner for data capture, archiving, and telementoring. Data relay of the OR procedure is facilitated by a control room located in the vicinity of the OR. Designing the layout of the OR is extremely important, necessitating thoughtful planning to provide hassle-free movement, comfort to the surgeon, and efficient data archiving and transmission during a surgical

  9. Development and Evaluation of an Intuitive Operations Planning Process

    Science.gov (United States)

    2006-03-01

    flip chart with paper, talc (for creating overlays), pens and pencils, etc. The planning teams used the laptops, whiteboards, flipcharts and talc for...working together to determine structure and composition (ORBAT) of the armored BG 0:06 Putting info on flip chart 1 0:07 Cmdr leaves to go planning 0

  10. Heuristics in Global Combat Logistics Force Operational Planning

    Science.gov (United States)

    2010-03-01

    maximizes deployed battle group on-station-time and endurance. The author presents a heuristic algorithm extension to the legacy CLF planning tool to plan...for completion, and can require 5 minutes to an hour just to find an initial feasible solution. On the contrary, a heuristic algorithm can provide initial feasible solutions in a matter of seconds.

  11. 77 FR 25577 - General Provisions; Operating and Strategic Business Planning

    Science.gov (United States)

    2012-05-01

    ... include a marketing plan that discusses how the institution will further the objective that the FCS be..., in order to fulfill the objectives of this rule, the human capital and marketing plans must include...) 883-4020. SUPPLEMENTARY INFORMATION: I. Objectives The objectives of this amendment are to ensure that...

  12. MSFC Doppler Lidar Science experiments and operations plans for 1981 airborne test flight

    Science.gov (United States)

    Fichtl, G. H.; Bilbro, J. W.; Kaufman, J. W.

    1981-01-01

    The flight experiment and operations plans for the Doppler Lidar System (DLS) are provided. Application of DLS to the study of severe storms and local weather penomena is addressed. Test plans involve 66 hours of flight time. Plans also include ground based severe storm and local weather data acquisition.

  13. 40 CFR 141.804 - Aircraft water system operations and maintenance plan.

    Science.gov (United States)

    2010-07-01

    ...) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Aircraft Drinking Water Rule § 141.804 Aircraft water system operations and maintenance plan. (a) Each air carrier must develop and implement an aircraft water system operations and maintenance plan for each aircraft water system that it...

  14. 77 FR 37283 - General Provisions; Operating and Strategic Business Planning; Effective Date

    Science.gov (United States)

    2012-06-21

    ... From the Federal Register Online via the Government Publishing Office FARM CREDIT ADMINISTRATION 12 CFR Part 618 RIN 3052-AC66 General Provisions; Operating and Strategic Business Planning... Credit System institution to adopt an operational and strategic business plan to include, among...

  15. 22 CFR Appendix I to Part 211 - Operational Plan

    Science.gov (United States)

    2010-04-01

    ...., that are necessary to achieve program impact, including determination of financial costs and sources of...) and (b), will be met. 5. Logistics. Provide a logistics plan that demonstrates the adequacy and...

  16. Sandia wind program FY94 annual operating plan

    Energy Technology Data Exchange (ETDEWEB)

    Dodd, H.M.

    1993-10-01

    This document presents the objectives, accomplishments and activity plan for the Sandia Wind Energy Technology Program. The status of the current program is summarized and the planned FY94 activities are defined. Appendices detailing the cost, performance and schedule associated with these activities are also included. Funding requirements are given for several scenarios in order to reflect the impact of funding variability on program progress.

  17. Use of sales and operations planning in small and medium-sized enterprises

    Directory of Open Access Journals (Sweden)

    Michał Adamczak

    2013-03-01

    Full Text Available Background: Increasing competitiveness in the market, customer expectations related to the shortening of the deadlines and the reduction of prices of products and services force companies to improve the efficiency of internal processes. The integration of planning process is one of possible ways to achieve this aim. The integration of planning processes by the use of SOP model (Sales and Operations Planning is a method to implement this idea. The study allowed to identify ways to implement the process of sales and operations planning in small and medium-sized enterprises. Material and methods: The study was conducted in companies from different industries. The research method was in-depth interviews conducted with managers of companies or persons occupying management positions in the organizational process of implementing sales and operations planning. Results: During the survey, 10 companies were asked about the use of sales and operations planning, its elements and organizational aspects of its development, by the company. Conclusions: The use of sales and operations plan is closely dependent on the size of the company and its localization in the supply chain. Small enterprises are not interested in the integration of the planning process due to the small scale of operations and the centralization of decision-making process. Medium-sized enterprises, due to the increased complexity of the processes of planning, see the benefits of their integration in the SOP model.

  18. An Operational Framework for Insecticide Resistance Management Planning.

    Science.gov (United States)

    Chanda, Emmanuel; Thomsen, Edward K; Musapa, Mulenga; Kamuliwo, Mulakwa; Brogdon, William G; Norris, Douglas E; Masaninga, Freddie; Wirtz, Robert; Sikaala, Chadwick H; Muleba, Mbanga; Craig, Allen; Govere, John M; Ranson, Hilary; Hemingway, Janet; Seyoum, Aklilu; Macdonald, Michael B; Coleman, Michael

    2016-05-01

    Arthropod vectors transmit organisms that cause many emerging and reemerging diseases, and their control is reliant mainly on the use of chemical insecticides. Only a few classes of insecticides are available for public health use, and the increased spread of insecticide resistance is a major threat to sustainable disease control. The primary strategy for mitigating the detrimental effects of insecticide resistance is the development of an insecticide resistance management plan. However, few examples exist to show how to implement such plans programmatically. We describe the formulation and implementation of a resistance management plan for mosquito vectors of human disease in Zambia. We also discuss challenges, steps taken to address the challenges, and directions for the future.

  19. Ganges Valley Aerosol Experiment: Science and Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Kotamarthi, VR

    2010-06-21

    emissions; and dust. The extended AMF deployment will enable measurements under different regimes of the climate and aerosol abundance—in the wet monsoon period with low aerosol loading; in the dry, hot summer with aerosols dispersed throughout the atmospheric column; and in the cool, dry winter with aerosols confined mostly to the boundary later and mid-troposphere. Each regime, in addition, has its own distinct radiative and atmospheric dynamic drivers. The aircraft operational phase will assist in characterizing the aerosols at times when they have been observed to be at the highest concentrations. A number of agencies in India will collaborate with the proposed field study and provide support in terms of planning, aircraft measurements, and surface sites. The high concentration of aerosols in the upper Ganges Valley, together with hypotheses involving several possible mechanisms with direct impacts on the hydrologic cycle of the region, gives us a unique opportunity to generate data sets that will be useful both in understanding the processes at work and in providing answers regarding the effects of aerosols on climate in a region where the perturbation is the highest.

  20. Benefits to blood banks of a sales and operations planning process.

    Science.gov (United States)

    Keal, Donald A; Hebert, Phil

    2010-12-01

    A formal sales and operations planning (S&OP) process is a decision making and communication process that balances supply and demand while integrating all business operational components with customer-focused business plans that links high level strategic plans to day-to-day operations. Furthermore, S&OP can assist in managing change across the organization as it provides the opportunity to be proactive in the face of problems and opportunities while establishing a plan for everyone to follow. Some of the key outcomes from a robust S&OP process in blood banking would include: higher customer satisfaction (donors and health care providers), balanced inventory across product lines and customers, more stable production rates and higher productivity, more cooperation across the entire operation, and timely updates to the business plan resulting in better forecasting and fewer surprises that negatively impact the bottom line.

  1. COMPARISON OF TWO METHODS OF OPERATING THEATRE PLANNING: APPLICATION IN BELGIAN HOSPITAL

    Institute of Scientific and Technical Information of China (English)

    Sondes CHAABANE; Nadine MESKENS; Alain GUINET; Marius LAURENT

    2008-01-01

    Operating Theatre is the centre of the hospital management's efforts. It constitutes the most expensive sector with more than 10% of the intended operating budget of the hospital. To reduce the costs while maintaining a good quality of care, one of the solutions is to improve the existent planning and scheduling methods by improving the services and surgical specialty coordination or finding the best estimation of surgical case durations. The other solution is to construct an effective surgical case plan and schedule. The operating theatre planning and scheduling is the two important steps, which aim to make a surgical case programming with an objective of obtaining a realizable and efficient surgical case schedule. This paper focuses on the first step, the operating theatre planning problem. Two planning methods are introduced and compared. Real data of a Belgian university hospital "Tivoli" are used for the experiments.

  2. Guide for Developing High-Quality School Emergency Operations Plans

    Science.gov (United States)

    Office of Safe and Healthy Students, US Department of Education, 2013

    2013-01-01

    Each school day, our nation's schools are entrusted to provide a safe and healthy learning environment for approximately 55 million elementary and secondary school students in public and nonpublic schools. In collaboration with their local government and community partners, schools can take steps to plan for these potential emergencies through the…

  3. Destruction of OPA from munitions demilitarization in supercritical water oxidation: kinetics of total organic carbon disappearance.

    Science.gov (United States)

    Veriansyah, Bambang; Kim, Jae-Duck; Lee, Jong-Chol; Hong, Deasik

    2006-01-01

    The destruction of OPA from munitions demilitarization has been accomplished in supercritical water oxidation (SCWO) with oxygen as oxidant in an isothermal continuous-flow reactor. The experiments were conducted at a temperature of 689-887 K and a fixed pressure of 25 MPa, with a residence time that ranged from 7 s to 14 s. The destruction efficiency was measured by total organic carbon (TOC) conversion. At the reaction condition, the initial TOC concentrations of OPA were varied from 1.41 mmol/L to 19.57 mmol/L and the oxygen concentrations were varied from 15.03 mmol/L to 81.85 mmol/L. Experimental data showed that all the TOC conversions were >80% under the above experimental conditions. The kinetics of TOC disappearance, which is essential for the design, optimization, and control of reliable commercial SCWO reactor was developed by taking into account the dependence of the oxidant and TOC concentration on the reaction rate. A global TOC disappearance rates expression was regressed from the data of 38 experiments, to a 95% confidence level. The resulting activation energy was determined to be 44.01 +/- 1.52 kJ/mol, and the pre-exponential factor was (1.67 +/- 0.45) x 10(2) L(1.14) mmol(-0.14) s(-1). The reaction orders for the TOC and the oxidant were 0.98 +/- 0.01 and 0.16 +/- 0.02, respectively.

  4. Operating and Maintaining Energy Smart Schools Action Plan Template - All Action Plans

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2009-07-01

    EnergySmart Schools action plan templates for benchmarking, lighting, HVAC, water heating, building envelope, transformer, plug loads, kitchen equipment, swimming pool, building automation system, other.

  5. Operational freight carrier planning basic concepts, optimization models and advanced memetic algorithms

    CERN Document Server

    Schönberger, Jörn

    2005-01-01

    The modern freight carrier business requires a sophisticated automatic decision support in order to ensure the efficiency and reliability and therefore the survival of transport service providers. This book addresses these challenges and provides generic decision models for the short-term operations planning as well as advanced metaheuristics to obtain efficient operation plans. After a thorough analysis of the operations planning in the freight carrier business, decision models are derived. Their suitability is proven within a large number of numerical experiments, in which a new class of hybrid genetic search approaches demonstrate their appropriateness.

  6. Tracking Trajectory Planning of Space Manipulator for Capturing Operation

    Directory of Open Access Journals (Sweden)

    Panfeng Huang

    2008-11-01

    Full Text Available On-orbit rescuing uncontrolled spinning satellite (USS using space robot is a great challenge for future space service. This paper mainly present a trajectory planning method of space manipulator that can track, approach and catch the USS in free-floating situation. According to the motion characteristics of USS, we plan a spiral ascending trajectory for space manipulator to approach towards USS in Cartesian space. However, it is difficult to map this trajectory into the joint space and realize feasible motion in joint space because of dynamics singularities and dynamics couple of space robot system. Therefore, we utilize interval algorithm to handle these difficulties. The simulation study verifies that the spiral ascending trajectory can been realized. Moreover, the motion of manipulator is smooth and stable, the disturbance to the base is so limited that the attitude control can compensate it.

  7. Automated Planning and Scheduling for Space Mission Operations

    Science.gov (United States)

    Chien, Steve; Jonsson, Ari; Knight, Russell

    2005-01-01

    Research Trends: a) Finite-capacity scheduling under more complex constraints and increased problem dimensionality (subcontracting, overtime, lot splitting, inventory, etc.) b) Integrated planning and scheduling. c) Mixed-initiative frameworks. d) Management of uncertainty (proactive and reactive). e) Autonomous agent architectures and distributed production management. e) Integration of machine learning capabilities. f) Wider scope of applications: 1) analysis of supplier/buyer protocols & tradeoffs; 2) integration of strategic & tactical decision-making; and 3) enterprise integration.

  8. Operations Research in a New Spanish Air Force Planning System

    Science.gov (United States)

    1991-06-01

    8. Gomez-Coll, Gen. Carlos. " Politica Area a corto y medio plazo," Revista de Aeronautica y Astronautica 569, pages 553-558 (May 1988). 9. Howard...Department of the Air Force. Basic Aerospace Doctrine of the United States Air Force. AFM 1-1. Washington: HQ USAF, March 1984. 5. Editorial. " Politica de...Defensa y Planeamiento Militar," Revista de Aeronautica y Astronautica 565 (January 1988). 6. Ferguson, Lt. Gen. Thomas R. "Requirements Planning

  9. Centralized operations and maintenance planning at the Atacama Large Millimeter/submillimeter Array (ALMA)

    Science.gov (United States)

    Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan

    2016-07-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.

  10. Mission Continuity Planning: Strategically Assessing and Planning for Threats to Operations.

    Science.gov (United States)

    Qayoumi, Mohammad H.

    This book covers the principles of risk and risk management and offers a framework for analyzing the significant, often unforeseen threats facing higher education institutions today. It examines the critical elements of a disaster preparedness plan and addresses business continuity and mission continuity planning. The book also provides tools for…

  11. Planning to avoid trouble in the operating room: experts' formulation of the preoperative plan.

    Science.gov (United States)

    Zilbert, Nathan R; St-Martin, Laurent; Regehr, Glenn; Gallinger, Steven; Moulton, Carol-Anne

    2015-01-01

    The purpose of this study was to capture the preoperative plans of expert hepato-pancreato-biliary (HPB) surgeons with the goal of finding consistent aspects of the preoperative planning process. HPB surgeons were asked to think aloud when reviewing 4 preoperative computed tomography scans of patients with distal pancreatic tumors. The imaging features they identified and the planned actions they proposed were tabulated. Surgeons viewed the tabulated list of imaging features for each case and rated the relevance of each feature for their subsequent preoperative plan. Average rater intraclass correlation coefficients were calculated for each type of data collected (imaging features detected, planned actions reported, and relevance of each feature) to establish whether the surgeons were consistent with one another in their responses. Average rater intraclass correlation coefficient values greater than 0.7 were considered indicative of consistency. Division of General Surgery, University of Toronto. HPB surgeons affiliated with the University of Toronto. A total of 11 HPB surgeons thought aloud when reviewing 4 computed tomography scans. Surgeons were consistent in the imaging features they detected but inconsistent in the planned actions they reported. Of the HPB surgeons, 8 completed the assessment of feature relevance. For 3 of the 4 cases, the surgeons were consistent in rating the relevance of specific imaging features on their preoperative plans. These results suggest that HPB surgeons are consistent in some aspects of the preoperative planning process but not others. The findings further our understanding of the preoperative planning process and will guide future research on the best ways to incorporate the teaching and evaluation of preoperative planning into surgical training. Copyright © 2014 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  12. Planning guide biomass conversion plants consisting of concrete. Planning, dimensioning and operation; Planungshilfe Biogasanlagen aus Beton. Planung, Bemessung, Ausfuehrung

    Energy Technology Data Exchange (ETDEWEB)

    Middel, Matthias (ed.)

    2013-08-01

    In recent years, the construction of biomass conversion plants for the production of clean energy experienced a boom. This boom will still continue for some years. The operation of biomass conversion plants imposes high demands on the construction. Simultaneously, the operators of biomass conversion plants expect a long trouble-free service life of their plants. Biogas plants consisting of concrete meet these requirements, if these are carefully planned and performed. The book under consideration provides the necessary expertise for this.

  13. Continuity of operations planning in college athletic programs: The case for incorporating Federal Emergency Management Guidelines.

    Science.gov (United States)

    Hall, Stacey A; Allen, Brandon L; Phillips, Dennis

    2016-01-01

    College athletic departments have a responsibility to provide a safe environment for student-athletes; however, most colleges do not have a crisis management plan that includes procedures for displaced student-athletes or alternate facilities to perform athletic events. Continuity of operations planning ensures athletic programs are equipped to maintain essential functions during, or shortly after, a disruption of operations due to possible hazards. Previous studies have identified a lack of emergency preparedness and continuity planning in college athletic departments. The purpose of this article is to illustrate in detail one approach to disaster planning for college athletic departments, namely the Federal Emergency Management Agency (FEMA) continuity of operations framework. By adhering to FEMA guidelines and promoting a best practices model, athletic programs can effectively plan to address potential hazards, as well as protect the organization's brand, image, and financial sustainability after a crisis event.

  14. 25 CFR 20.209 - Can a tribe operating under a tribal redesign plan go back to operating under this part?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can a tribe operating under a tribal redesign plan go back to operating under this part? 20.209 Section 20.209 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT....209 Can a tribe operating under a tribal redesign plan go back to operating under this part? Yes, a...

  15. Plans for a German Grid Operations and Support Centre

    Science.gov (United States)

    Reißer, Sabin

    The German grid initiative D-Grid brings together various scientific and commercial projects in fields like medicine, engineering, banking, meteorology using the same grid infrastructure. In this infrastructure, which comprises more than 30 computing centres, three middleware stacks (gLite, Globus and Unicore) are deployed and used by the various communities. This variety of applications as well as of middleware calls for well organised operations and support. The German Grid Operations and Support Centre (GOSC) aim to answer this challenge and also provides an uplink to international activities like EGI. The GOSC will provide middleware services like reference installations for the various middleware flavours. It will manage the national grid operations (regional monitoring, SLA enforcement) and will be responsible for providing VO and user services, like application support and a helpdesk.

  16. Decisional pathways in breast augmentation: how to improve outcomes through accurate pre-operative planning.

    Science.gov (United States)

    Nava, Maurizio B; Rocco, Nicola; Tunesi, Gianfranco; Catanuto, Giuseppe; Rancati, Alberto; Dorr, Julio

    2017-04-01

    Breast augmentation is the most commonly performed surgical procedure in aesthetic plastic surgery. Accurate pre-operative planning is crucial to obtain the best outcomes. We present our planning method deriving from a more than 30-year experience in aesthetic breast surgery, matching together patients tissues' characteristics and patients' wishes. We schematized our planning method in an easy-to-use flow diagram to help the decisional process in breast augmentation.

  17. Tank Farm Contractor Operation and Utilization Plan [SEC 1 Thru 3

    Energy Technology Data Exchange (ETDEWEB)

    KIRKBRIDE, R.A.

    2000-04-19

    This document updates the operating scenario and plans for feed delivery to BNFL Inc. of retrieval and waste from single-shell tanks, and the overall process flowsheets for Phases 1 and 2 of the River Protection Project. The plans and flowsheets are updated with the most recent guidance from ORP and tank-by-tank inventory. The results provide the technical basis for the RTP-2 planning effort. Sensitivity cases were run to evaluate the effect of changes on key parameters.

  18. A Hybrid Analytical/Simulation Modeling Approach for Planning and Optimizing Mass Tactical Airborne Operations

    Science.gov (United States)

    1995-05-01

    A HYBRID ANALYTICAL/ SIMULATION MODELING APPROACH FOR PLANNING AND OPTIMIZING MASS TACTICAL AIRBORNE OPERATIONS by DAVID DOUGLAS BRIGGS M.S.B.A...COVERED MAY 1995 TECHNICAL REPORT THESIS 4. TITLE AND SUBTITLE 5. FUNDING NUMBERS A HYBRID ANALYTICAL SIMULATION MODELING APPROACH FOR PLANNING AND...are present. Thus, simulation modeling presents itself as an excellent alternate tool for planning because it allows for the modeling of highly complex

  19. Operable Unit C Remedial Investigation Sampling and Analysis Plan

    Science.gov (United States)

    1994-05-02

    RI will be brought to the attention of the Well Abandonmetnt Team so they can be properly decommissioned . 1.3 Updates to the OU C RI SAP As the current...OUcsA•2I•r2944a 5.1-7 TABLE 5.1-2. (Continued) DATA QUALITY OBJECTIVES FOR PFR 65 Problen Statenent If hazardous materials were disposed at PRL 65, the...Summary: Decommissioning plans for BW-6, BW-16, and boring DEB-C1 (possible conduits for contaminant migration) should be provided. Response: Text has been

  20. Procurement planning in oil refining industries considering blending operations

    DEFF Research Database (Denmark)

    Oddsdottir, Thordis Anna; Grunow, Martin; Akkerman, Renzo

    2013-01-01

    This paper addresses procurement planning in oil refining, which has until now only had limited attention in the literature. We introduce a mixed integer nonlinear programming (MINLP) model and develop a novel two-stage solution approach, which aims at computational efficiency while addressing...... the problems due to discrepancies between a non-linear and a linearized formulation. The proposed model covers realistic settings by allowing the blending of crude oil in storage tanks, by modeling storage tanks and relevant processing units individually, and by handling more crude oil types and quality...

  1. General Urban Warfare Amphibious Logistics Applications. Volume 2. Operations Plan.

    Science.gov (United States)

    1983-06-23

    Appendix 7 (Engineer Support Plan). Estimated Priority Bridae Task Size Unit Assigned 1 1, 3, 5 Co.(-) 7th Engr Spt Bn 2 6, 7, 8, 10 Pit.(+) 7th Engr Spt... BrIda OtnarAl U. S149Ay Cr ogS~y~po~m B~n. I ~litrhotlnl OC-400n0la 14 i l IA cvV (DAREEP IV03R2 I F IUIVTGNEA W UNCLASIFIE IgdirGo ,1 VA .CM Marf tf

  2. Implementation plan for the Operations Center Upgrade project

    Energy Technology Data Exchange (ETDEWEB)

    Pope, N.G.; Brown, R.E.; Turner, W.J.; Courtney, K.; Joseph, E.L.; Jones, D.; Pruett, S.

    1996-06-01

    The crossover from the existing TA-55 Facility Control System to a newly constructed system will be implemented over a four-month period beginning the first week in January, 1997. Personnel requirements and task duration have been established using planning and scheduling project management techniques. Each facility subsystem will be crossed over on individual four-day maintenance weekends during which building PF-4 will be exclusively reserved for these tasks. Each subsystem will be validated prior to the resumption of normal programmatic activities. PF-4 will be open for normal activities between each four-day maintenance weekend. Crossover will not begin until specifically outlined tasks are completed.

  3. Operating plan for the Office of International Health Programs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    In this report unified ideas are presented about what the Office of International Health Programs does, what the individual contributions are, and how the organization connects to the Department of Energy. The planning efforts have focused on the office`s three areas of responsibility: Europe, Japan, and the Marshall Islands. Common to each technical program area are issues related to the following: health of populations exposed to radiation incidents and the associated medical aspects of exposure; dose reconstruction; training; and public involvement. Each of the program areas, its customers, and primary customer interests are described.

  4. Predicting Correct Body Posture based on Theory of Planned Behavior in Iranian Operating Room Nurses

    National Research Council Canada - National Science Library

    BAHAREH ABEDI; RABIOLLAH FARMANBAR1; SAEED OMIDI; MAHDI JAHANGIR BLOURCHIAN

    2015-01-01

    Due to the importance of correct posture for preventing musculoskeletal disorders, the purpose of this study was to evaluate Theory of Planned Behavior in Predicting correct Body Posture in operating room...

  5. Robust, Multi-layered Plan Execution and Revision for Operation of a Network of Communication Antennas

    Science.gov (United States)

    Chien, S. A.; Hill, R. W., Jr.; Govindjee, A.; Wang, X.; Estlin, T.; Griesel, M. A.; Lam, R.; Fayyad, K. V.

    1996-01-01

    This paper describes a hierarchical scheduling, planning, control, and execution monitoring architecture for automating operations of a worldwide network of communications antennas. The purpose of this paper is to describe an architecture for automating the process of capturing spacecraft data.

  6. Decision Support Using Simulation for Customer-Driven Manufacturing System Design and Operations Planning

    OpenAIRE

    Heilala, Juhani; Montonen, Jari; Jarvinen, Paula; Kivikunnas, Sauli

    2010-01-01

    The chapter is a summary of following national public research projects: "Integrated dynamic simulation model of enterprise for planning of operations", (1997-1999); "Integrated dynamic customer driven production network management using operative simulation" (2000-2001) and "Integrated dynamic electronic production and suppliers control and planning of resources" (2000-2001). Development work was later carried out in the projects "Modelling and simulation of manufacturing systems for value n...

  7. 30 CFR 780.12 - Operation plan: Existing structures.

    Science.gov (United States)

    2010-07-01

    ... showing that the risk of harm to the environment or to public health or safety is not significant during... Section 780.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS...

  8. 30 CFR 784.12 - Operation plan: Existing structures.

    Science.gov (United States)

    2010-07-01

    ... showing that the risk of harm to the environment or to public health or safety is not significant during... Section 784.12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS...

  9. WP3 Prototype development for operational planning tool

    DEFF Research Database (Denmark)

    Kristoffersen, Trine; Meibom, Peter; Apfelbeck, J.

    of electricity load and wind power production, and to cover forced outages of power plants and transmission lines. Work has been carried out to include load uncertainty and forced outages in the two main components of the Wilmar Planning tool namely the Scenario Tree Tool and the Joint Market Model. This work...... is documented in chapter 1 and 2. The inclusion of load uncertainty and forced outages in the Scenario Tree Tool enables calculation of the demand for reserve power depending on the forecast horizon. The algorithm is given in Section 3.1. The design of a modified version of the Joint Market Model enabling....... Further, the methodology to identify extreme events on the basis of the existing tools is described. Within the SUPWIND consortium there has been an interest in using the Joint Market Model to model smaller parts of a power system but with more detailed representation of the transmission and distribution...

  10. Operations of and Future Plans for the Pierre Auger Observatory

    Energy Technology Data Exchange (ETDEWEB)

    Abraham, : J.; Abreu, P.; Aglietta, M.; Aguirre, C.; Ahn, E.J.; Allard, D.; Allekotte, I.; Allen, J.; Alvarez-Muniz, J.; Ambrosio, M.; Anchordoqui, L.

    2009-06-01

    These are presentations to be presented at the 31st International Cosmic Ray Conference, in Lodz, Poland during July 2009. It consists of the following presentations: (1) Performance and operation of the Surface Detectors of the Pierre Auger Observatory; (2) Extension of the Pierre Auger Observatory using high-elevation fluorescence telescopes (HEAT); (3) AMIGA - Auger Muons and Infill for the Ground Array of the Pierre Auger Observatory; (4) Radio detection of Cosmic Rays at the southern Auger Observatory; (5) Hardware Developments for the AMIGA enhancement at the Pierre Auger Observatory; (6) A simulation of the fluorescence detectors of the Pierre Auger Observatory using GEANT 4; (7) Education and Public Outreach at the Pierre Auger Observatory; (8) BATATA: A device to characterize the punch-through observed in underground muon detectors and to operate as a prototype for AMIGA; and (9) Progress with the Northern Part of the Pierre Auger Observatory.

  11. Planning, Investment, Construction and Operation of Rail Transit in Beijing

    Institute of Scientific and Technical Information of China (English)

    2012-01-01

    In Beijing, the rail transit firstly came into existence in the mid 1960s and was officially put into operation for civil use in the early 1980s. It has entered a period of rapid development since 2001, with thanks to the coming of the Olympic Games in 2008, and has been playing a more and more important role in the passenger transport of Beijing since then on, as a key part of the public transportation. Based on a resume on the evolution of rail transit development in Beijing, this paper analyzes the mechanism of policy-making, the mode of investment and financing, the procedure of construction, and the management of operation of rail transit, all of which ensure its rapid development and effective performance.

  12. Probabilistic tools for planning and operating power systems with distributed energy storage

    DEFF Research Database (Denmark)

    Klöckl, Bernd; Papaefthymiou, George; Pinson, Pierre

    2008-01-01

    Stochastic energy flows are an increasingly important phenomenon in today's power system planning and operation. They are – among other reasons – caused by large amounts of stochastic generation such as wind. The inclusion of energy storage devices, distributed in future systems (distributed energy...... owners are either the grid operators, the generation owners, or the energy traders. For the grid operators being the DES owners, storage operation will have to be integrated into the planning of the system, therefore multivariate nonparametric time series analysis and synthesis methods have to be applied...... to recorded data of stochastic energy resources. Together with suited storage models, the implications of DES on the planning of the system can then be assessed. For the producers or traders being the owners of the DES, the topic to be addressed is the real-time operation of each storage device in the power...

  13. 4TH Marine Division Operation Plan Number 49-44

    Science.gov (United States)

    1944-12-26

    The SFCP irill then designate the letter to be keyed by beacon during tuning. (c) If other means of Corn fail, spots may be transmitted by manually ...provisions of Staff Officer’s Field Manual for Amphibious Operations. 2. The Division Shore Party will be comprised of units or elements thereof as...Annex "Ain to Division administrativo Order Nio, 43-44, (Reviej)) . (4) Repai~, section to provide 2d, 3d and 4th echelon mainteniaince for Engineer

  14. Tank Farm Contractor Operation and Utilization Plan [SEC 1 Thru 3

    Energy Technology Data Exchange (ETDEWEB)

    KIRKBRIDE, R.A.

    1999-05-04

    The Tank Waste Remediation System Operation and Utilization Plan updates the operating scenario and plans for the delivery of feed to BNFL Inc., retrieval of waste from single-shell tanks, and the overall process flowsheets for Phases I and II of the privatization of the Tank Waste Remediation System. The plans and flowsheets are updated with the most recent tank-by-tank inventory and sludge washing data. Sensitivity cases were run to evaluate the impact or benefits of proposed changes to the BNFL Inc. contract and to evaluate a risk-based SST retrieval strategy.

  15. Preparing GMAT for Operational Maneuver Planning of the Advanced Composition Explorer (ACE)

    Science.gov (United States)

    Qureshi, Rizwan Hamid; Hughes, Steven P.

    2014-01-01

    The General Mission Analysis Tool (GMAT) is an open-source space mission design, analysis and trajectory optimization tool. GMAT is developed by a team of NASA, private industry, public and private contributors. GMAT is designed to model, optimize and estimate spacecraft trajectories in flight regimes ranging from low Earth orbit to lunar applications, interplanetary trajectories and other deep space missions. GMAT has also been flight qualified to support operational maneuver planning for the Advanced Composition Explorer (ACE) mission. ACE was launched in August, 1997 and is orbiting the Sun-Earth L1 libration point. The primary science objective of ACE is to study the composition of both the solar wind and the galactic cosmic rays. Operational orbit determination, maneuver operations and product generation for ACE are conducted by NASA Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF). This paper discusses the entire engineering lifecycle and major operational certification milestones that GMAT successfully completed to obtain operational certification for the ACE mission. Operational certification milestones such as gathering of the requirements for ACE operational maneuver planning, gap analysis, test plans and procedures development, system design, pre-shadow operations, training to FDF ACE maneuver planners, shadow operations, Test Readiness Review (TRR) and finally Operational Readiness Review (ORR) are discussed. These efforts have demonstrated that GMAT is flight quality software ready to support ACE mission operations in the FDF.

  16. Assessing the impact of meteorological factors on malaria patients in demilitarized zones in Republic of Korea

    Institute of Scientific and Technical Information of China (English)

    Se-Min Hwang; Seok-Joon Yoon; Yoo-Mi Jung; Geun-Yong Kwon; Soo-Nam Jo; Eun-Jeong Jang; Myoung-Ok Kwon

    2016-01-01

    Background:The trend of military patients becoming infected with vivox malaria reemerged in the Republic of Korea (ROK) in 1993.The common explanation has been that infective Anopheles mosquitoes from the Democratic People's Republic of Korea have invaded Republic of Korea's demilitarized zone (DMZ).The aim of this study was to verify the relationship between meteorological factors and the number of malaria patients in the military in this region.Methods:The authors estimated the effects of meteorological factors on vivax malaria patients from the military based on the monthly number of malaria cases between 2006 and 2011.Temperature,precipitation,snow depth,wind velocity,relative humidity,duration of sunshine,and cloud cover were selected as the meteorological factors to be studied.A systematic pattern in the spatial distribution of malaria cases was assessed using the Moran's Index.Granger causality tests and cross-correlation coefficients were used to evaluate the relationship between meteorological factors and malaria patients in the military.Results:Spatial analysis revealed significant clusters of malaria patients in the military in Republic of Korea in 2011 (Moran's l=0.136,p-value =0.026).In the six years investigated,the number of malaria patients in the military in Paju decreased,but the number of malaria patients in the military in Hwacheon and Chuncheon increased.Monthly average,maximum and minimum temperatures;wind velocity;and relative humidity were found to be predicting factors of malaria in patients in the military in Paju.In contrast,wind velocity alone was not able to predict malaria in Hwacheon and Chuncheon,however,precipitation and cloud cover were able to predict malaria in Hwacheon and Chuncheon.Conclusions:This study demonstrated that the number of malaria patients in the military is correlated with meteorological factors.The variation in occurrence of malaria cases was principally attributed to differences in meteorological factors by

  17. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  18. Motion and operation planning of robotic systems background and practical approaches

    CERN Document Server

    Gomez-Barvo, Fernando

    2015-01-01

    This book addresses the broad multi-disciplinary topic of robotics, and presents the basic techniques for motion and operation planning in robotics systems. Gathering contributions from experts in diverse and wide ranging fields, it offers an overview of the most recent and cutting-edge practical applications of these methodologies. It covers both theoretical and practical approaches, and elucidates the transition from theory to implementation. An extensive analysis is provided, including humanoids, manipulators, aerial robots and ground mobile robots. ‘Motion and Operation Planning of Robotic Systems’ addresses the following topics: *The theoretical background of robotics. *Application of motion planning techniques to manipulators, such as serial and parallel manipulators. *Mobile robots planning, including robotic applications related to aerial robots, large scale robots and traditional wheeled robots. *Motion planning for humanoid robots. An invaluable reference text for graduate students and researche...

  19. A Test Platform for Planned Field Operations Using LEGO Mindstorms NXT

    Directory of Open Access Journals (Sweden)

    Gareth Edwards

    2013-11-01

    Full Text Available Testing agricultural operations and management practices associated with different machinery, systems and planning approaches can be both costly and time-consuming. Computer simulations of such systems are used for development and testing; however, to gain the experience of real-world performance, an intermediate step between simulation and full-scale testing should be included. In this paper, a potential common framework using the LEGO Mindstorms NXT micro-tractor platform is described in terms of its hardware and software components. The performance of the platform is demonstrated and tested in terms of its capability of supporting decision making on infield operation planning. The proposed system represents the basic measures for developing a complete test platform for field operations, where route plans, mission plans, multiple-machinery cooperation strategies and machinery coordination can be executed and tested in the laboratory.

  20. CARES: Carbonaceous Aerosol and Radiative Effects Study Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Zaveri, RA; Shaw, WJ; Cziczo, DJ

    2010-07-12

    The CARES field campaign is motivated by the scientific issues described in the CARES Science Plan. The primary objectives of this field campaign are to investigate the evolution and aging of carbonaceous aerosols and their climate-affecting properties in the urban plume of Sacramento, California, a mid-size, mid-latitude city that is located upwind of a biogenic volatile organic compound (VOC) emission region. Our basic observational strategy is to make comprehensive gas, aerosol, and meteorological measurements upwind, within, and downwind of the urban area with the DOE G-1 aircraft and at strategically located ground sites so as to study the evolution of urban aerosols as they age and mix with biogenic SOA precursors. The NASA B-200 aircraft, equipped with the High Spectral Resolution Lidar (HSRL), digital camera, and the Research Scanning Polarimeter (RSP), will be flown in coordination with the G-1 to characterize the vertical and horizontal distribution of aerosols and aerosol optical properties, and to provide the vertical context for the G-1 and ground in situ measurements.

  1. Cautious but committed: moving toward adaptive planning and operation strategies for renewable energy's wildlife implications.

    Science.gov (United States)

    Köppel, Johann; Dahmen, Marie; Helfrich, Jennifer; Schuster, Eva; Bulling, Lea

    2014-10-01

    Wildlife planning for renewable energy must cope with the uncertainties of potential wildlife impacts. Unfortunately, the environmental policies which instigate renewable energy and those which protect wildlife are not coherently aligned-creating a green versus green dilemma. Thus, climate mitigation efforts trigger renewable energy development, but then face substantial barriers from biodiversity protection instruments and practices. This article briefly reviews wind energy and wildlife interactions, highlighting the lively debated effects on bats. Today, planning and siting of renewable energy are guided by the precautionary principle in an attempt to carefully address wildlife challenges. However, this planning attitude creates limitations as it struggles to negotiate the aforementioned green versus green dilemma. More adaptive planning and management strategies and practices hold the potential to reconcile these discrepancies to some degree. This adaptive approach is discussed using facets of case studies from policy, planning, siting, and operational stages of wind energy in Germany and the United States, with one case showing adaptive planning in action for solar energy as well. This article attempts to highlight the benefits of more adaptive approaches as well as the possible shortcomings, such as reduced planning security for renewable energy developers. In conclusion, these studies show that adaptive planning and operation strategies can be designed to supplement and enhance the precautionary principle in wildlife planning for green energy.

  2. Optimal, Risk-based Operation and Maintenance Planning for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2008-01-01

    For offshore wind turbines costs to operation and maintenance are substantial. This paper describes a risk-based life-cycle approach for optimal planning of operation and maintenance. The approach is based on pre-posterior Bayesian decision theory. Deterioration mechanisms such as fatigue...

  3. Using Critical Problem Solving to Plan Inter-Organisational Co-operation in e-Customs

    NARCIS (Netherlands)

    Ponisio, M.L.; Eck, van P.A.T.; Riemens, L.

    2008-01-01

    The purpose of this paper is to present a systematic approach to plan assessment of electronic co-operation between customs organisations of different countries (e-Customs). Thorough assessment is of paramount importance, as co-operation in electronic networks usually requires considerable up-front

  4. Collaborative task planning for an internet based multi-operator multi-robot system

    Institute of Scientific and Technical Information of China (English)

    GAO Sheng; ZHAO Jie; CAI He-gao

    2005-01-01

    In an Internet based multi-operator and multi-robot system (IMOMR), operators have to work collaboratively to overcome the constraints of space and time. Inherently, the activities among them can be defined as a computer-supported cooperative work (CSCW). As a practical application of CSCW, a collaborative task planning system (CTPS) for IMOMR is proposed in this paper on the basis of Petri nets. Its definition, components design, and concrete implementation are given in detail, respectively. As a result, a clear collaboration mechanism of multiple operators in an IMOMR is obtained to guarantee their task planning.

  5. Integrated Assessment Plan Template and Operational Demonstration for SPIDERS Phase 2: Fort Carson

    Energy Technology Data Exchange (ETDEWEB)

    Barr, Jonathan L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tuffner, Francis K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hadley, Mark D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kreyling, Sean J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Schneider, Kevin P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-09-01

    This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collected from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).

  6. ’Winning the War’: Planning for Integrated, Synchronized, and Simultaneous Operations

    Science.gov (United States)

    2004-01-01

    environment that would permit the reestablishment of the legitimate government of President Aristide, . . . “neutralize the Haitian Army ( FAdH ) and to...know’ requirement. 47 Ibid., 16. 19 airport. The plan envisioned airborne, amphibious, and air assaults to neutralize the FAdH and police, secure...special operations task force (JSOTF) capturing the FAdH headquarters in Port Au Prince.48 After the initial operations, the Joint Special Operations

  7. Stochastic Methods for Planning and Operating Power Systems with Large Amounts of Wind and Solar Power: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Milligan, M.; Donohoo, P.; O' Malley, M.

    2012-09-01

    Wind and solar generators differ in their generation characteristics than conventional generators. The variable output and imperfect predictability of these generators face a stochastic approach to plan and operate the power system without fundamentally changing the operation and planning problems. This paper overviews stochastic modeling challenges in operations, generation planning, and transmission planning, with references to current industry and academic work. Different stochastic problem formulations, including approximations, are also discussed.

  8. Stochastic Methods for Planning and Operating Power Systems with Large Amounts of Wind and Solar Power: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Milligan, M.; Donohoo, P.; O' Malley, M.

    2012-09-01

    Wind and solar generators differ in their generation characteristics than conventional generators. The variable output and imperfect predictability of these generators face a stochastic approach to plan and operate the power system without fundamentally changing the operation and planning problems. This paper overviews stochastic modeling challenges in operations, generation planning, and transmission planning, with references to current industry and academic work. Different stochastic problem formulations, including approximations, are also discussed.

  9. Stereoelectroencephalography based on the Leksell stereotactic frame and Neurotech operation planning software.

    Science.gov (United States)

    Zhang, Guangming; Chen, Guoqiang; Meng, Dawei; Liu, Yanwu; Chen, Jianwei; Shu, Lanmei; Liu, Wenbo

    2017-06-01

    This study aimed to introduce a new stereoelectroencephalography (SEEG) system based on Leksell stereotactic frame (L-SEEG) as well as Neurotech operation planning software, and to investigate its safety, applicability, and reliability.L-SEEG, without the help of navigation, includes SEEG operation planning software (Neurotech), Leksell stereotactic frame, and corresponding surgical instruments. Neurotech operation planning software can be used to display three-dimensional images of the cortex and cortical vessels and to plan the intracranial electrode implantation. In 44 refractory epilepsy patients, 364 intracranial electrodes were implanted through the L-SEEG system, and the postoperative complications such as bleeding, cerebral spinal fluid (CSF) leakage, infection, and electrode-related problems were also investigated.All electrodes were implanted accurately as preoperatively planned shown by postoperative lamina computed tomography and preoperative lamina magnetic resonance imaging. There was no severe complication after intracranial electrode implantation through the L-SEEG system. There were no electrode-related problems, no CSF leakage and no infection after surgery. All the patients recovered favorably after SEEG electrode implantation, and only 1 patient had asymptomatic frontal lateral ventricle hematoma (3 mL).The L-SEEG system with Neurotech operation planning software can be used for safe, accurate, and reliable intracranial electrode implantation for SEEG.

  10. Health sector operational planning and budgeting processes in Kenya—“never the twain shall meet”

    Science.gov (United States)

    Molyneux, Sassy; Goodman, Catherine

    2015-01-01

    Summary Operational planning is considered an important tool for translating government policies and strategic objectives into day‐to‐day management activities. However, developing countries suffer from persistent misalignment between policy, planning and budgeting. The Medium Term Expenditure Framework (MTEF) was introduced to address this misalignment. Kenya adopted the MTEF in the early 2000s, and in 2005, the Ministry of Health adopted the Annual Operational Plan process to adapt the MTEF to the health sector. This study assessed the degree to which the health sector Annual Operational Plan process in Kenya has achieved alignment between planning and budgeting at the national level, using document reviews, participant observation and key informant interviews. We found that the Kenyan health sector was far from achieving planning and budgeting alignment. Several factors contributed to this problem including weak Ministry of Health stewardship and institutionalized separation between planning and budgeting processes; a rapidly changing planning and budgeting environment; lack of reliable data to inform target setting and poor participation by key stakeholders in the process including a top‐down approach to target setting. We conclude that alignment is unlikely to be achieved without consideration of the specific institutional contexts and the power relationships between stakeholders. In particular, there is a need for institutional integration of the planning and budgeting processes into a common cycle and framework with common reporting lines and for improved data and local‐level input to inform appropriate and realistic target setting. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd. PMID:25783862

  11. Health sector operational planning and budgeting processes in Kenya-"never the twain shall meet".

    Science.gov (United States)

    Tsofa, Benjamin; Molyneux, Sassy; Goodman, Catherine

    2016-07-01

    Operational planning is considered an important tool for translating government policies and strategic objectives into day-to-day management activities. However, developing countries suffer from persistent misalignment between policy, planning and budgeting. The Medium Term Expenditure Framework (MTEF) was introduced to address this misalignment. Kenya adopted the MTEF in the early 2000s, and in 2005, the Ministry of Health adopted the Annual Operational Plan process to adapt the MTEF to the health sector. This study assessed the degree to which the health sector Annual Operational Plan process in Kenya has achieved alignment between planning and budgeting at the national level, using document reviews, participant observation and key informant interviews. We found that the Kenyan health sector was far from achieving planning and budgeting alignment. Several factors contributed to this problem including weak Ministry of Health stewardship and institutionalized separation between planning and budgeting processes; a rapidly changing planning and budgeting environment; lack of reliable data to inform target setting and poor participation by key stakeholders in the process including a top-down approach to target setting. We conclude that alignment is unlikely to be achieved without consideration of the specific institutional contexts and the power relationships between stakeholders. In particular, there is a need for institutional integration of the planning and budgeting processes into a common cycle and framework with common reporting lines and for improved data and local-level input to inform appropriate and realistic target setting. © 2015 The Authors. International Journal of Health Planning and Management published by John Wiley & Sons, Ltd.

  12. Predicting changes in blood flow in patient-specific operative plans for treating aortoiliac occlusive disease.

    Science.gov (United States)

    Wilson, Nathan M; Arko, Frank R; Taylor, Charles A

    2005-07-01

    Traditionally, a surgeon will select a procedure for a particular patient on the basis of past experience with patients with a similar state of disease. The experience gained from this patient will be selectively used when treating the next patient with similar symptoms. This article describes a surgical planning system that was developed to enable a vascular surgeon to create and test alternative operative plans prior to surgery for a given patient. One-dimensional and three-dimensional hemodynamic (i.e., blood flow) simulations were performed for rest and exercise for operative plans for two aorto-femoral bypass patients and compared with actual postoperative data. The information obtained from one-dimensional (volume flow distribution and pressure losses) and three-dimensional (flow, pressure, and wall shear stress) hemodynamic simulations may be clinically relevant to vascular surgeons planning interventions.

  13. Phase Zero Contracting Operations-Strategic and Integrative Planning for Contingency and Expeditionary Operations

    Science.gov (United States)

    2013-10-01

    NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Defense Acquisition...Annex W plan may utilize strength, weakness, opportunity, threat ( SWOT ) and capability gap analysis techniques. The SWOT method allows the IPE to...More Robust Construction Supplies; Oce Equipment; Quality of Life ; and Morale, Welfare, and Recreation PO/TO/DO/BPA Small Purchase Standard Vehicles PO

  14. Predicting Correct Body Posture based on Theory of Planned Behavior in Iranian Operating Room Nurses

    OpenAIRE

    BAHAREH ABEDI; RABIOLLAH FARMANBAR1; SAEED OMIDI; MAHDI JAHANGIR BLOURCHIAN

    2015-01-01

    Due to the importance of correct posture for preventing musculoskeletal disorders, the purpose of this study was to evaluate Theory of Planned Behavior in Predicting correct Body Posture in operating room nurses.In this cross-sectional study, participants (n=100) were nurses from five hospitals located in northern Iran. Participants completed demographic data and theory of planned behavior construct Questionnaires. In addition, the researcher checked the Body Posture of nurses by Rapid Entire...

  15. Counterinsurgency and Operational Art: Is the Joint Campaign Planning Model Adequate?

    Science.gov (United States)

    2003-01-01

    National Campaign Plan (1983)...............................................................................................54 Unidos Para Reconstruir...Insurgency and Counterinsurgency in El Salvador Cuando la historia no se puede con la pluma, hay que escríbirla con el fusil (When history can no...able to shift as easily to a new operational concept as the FMLN. In 1986, the ESAF produced another COIN plan called Unidos Para Reconstruir (United

  16. The Synthesis Method of Automated System of Operational Planning in Low-Space Communication System Messaging

    Directory of Open Access Journals (Sweden)

    Serhii Kovbasiuk

    2017-04-01

    Full Text Available One of the reasons for the decrease of efficiency in low-speed communication systems, satellite communication, which are based on nanoplatform is a high degree of operational planning centralisation. To overcome this problem the method which carries out the distribution of tasks of communications operational planning minimizing the exchange of information between spatially remote sites, and takes into account the computing performance of software and hardware was developed. The technique is based on the use of methods of structural and parametric synthesis, simulation and statistical analysis of the results. Its use allows to obtain the optimal structure of the automated system of operational planning in low-space communication system messaging evaluation of efficiency in terms of fixed communication of information load.

  17. The Role of the Media in The Operational Deception Plan for Operation Desert Storm

    Science.gov (United States)

    1992-04-01

    Schwarzkopf. 60 John M,Broger, "Schwarzkoi0f’s War Plan Based on Deception Los Anodeles Times, 28 Feb. 1991, Sec. A, p. 16. 61 Tim Wqiner.awR’ceotlon Decoys...1991, p. Iz. 117 For one example of this, see Mike Tharp , ’Desert B!:-1..., U.S. News & World Recort, 18 Feb. 1991 p. 14. The article Iieteo a town...It or Not News Media are Needed.’ Air Force Times, 19 Aug. 1991, p. 63. Tharp Mike. ’Desert Bloom.’ U.S. News & World Report, 18 Feb. 1991, p. l4o

  18. Optimal Planning and Operation of Hybrid Energy System Supplemented by Storage Devices

    DEFF Research Database (Denmark)

    Javadi, Mohammad Sadegh; Anvari-Moghaddam, Amjad; Guerrero, Josep M.

    2017-01-01

    This paper presents a two-stage model for optimal planning and operation of a distribution network. Optimal siting and sizing of renewable energy sources (RES) as well as electrical energy storage (EES) systems are considered in the proposed hybrid energy system. In this context, the planning...... problem is considered as a master problem, while there are different sub-problems associated with the short-term operational problem. To properly handle the uncertainties of forecasted load as well as renewable power generations, fair stochastic models are involved in the sub-problems based on historical...

  19. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

  20. The Transition from VMS to Unix Operations for STScI's Science Planning and Scheduling Team

    Science.gov (United States)

    Adler, D. S.; Taylor, D. K.

    The Science Planning and Scheduling Team of the Space Telescope Science Institute currently uses the VMS operating system. SPST began a transition to Unix-based operations in the summer of 1999. The main tasks for SPST to address in the Unix transition are: (1) converting the current SPST operational tools from DCL to Python; (2) converting our database report scripts from SQL; (3) adopting a Unix-based code management system; and (4) training the SPST staff. The goal is to fully transition the team to Unix operations by the end of 2001.

  1. Strategic operations planning - it's not just for wilderness! How the Strategic Operations Planner can help

    Science.gov (United States)

    Charles W. McHugh; Stu Hoyt; Brett Fay

    2015-01-01

    The Strategic Operational Planner (SOPL) wildland fire management position was created in the United States in 2009 to reflect updated terminology. SOPL merges the former Fire Use Manager positions (FUM1 and FUM2) and is now an established position within the Incident Command System. Traditionally, the FUM positions and the SOPL have been used on incidents managed for...

  2. Systemic Operational Design: Improving Operational Planning for the Netherlands Armed Forces

    Science.gov (United States)

    2006-05-25

    This methodology is called Soft Systems Methodology . His methodology is a structured way of thinking in which not only a perceived problematic...Many similarities exist between Systemic Operational Design and Soft Systems Methodology , their epistemology is related. Furthermore, they both have...Systems Thinking: Managing Chaos and Complexity. Boston: Butterworth Heinemann, 1999. Checkland, Peter, and Jim Scholes. Soft Systems Methodology in

  3. ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

    Science.gov (United States)

    Hall, Timothy A.

    2011-01-01

    In 2008 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organization to find ways to reduce the costs of International Space station (ISS) console operations in the Mission Control Center (MCC). Each MOD organization was asked to identify projects that would help them attain a goal of a 30% reduction in operating costs by 2012. The MOD Operations and Planning organization responded to this challenge by launching several software automation projects that would allow them to greatly improve ISS console operations and reduce staffing and operating costs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the plan of eliminating two full time ISS console support positions by 2012. This will account for an overall 10 EP reduction in staffing for the Operations and Planning organization. These automation projects focused on utilizing software to automate many administrative and often repetitive tasks involved with processing ISS planning and daily operations information. This information was exchanged between the ground flight control teams in Houston and around the globe, as well as with the ISS astronaut crew. These tasks ranged from managing mission plan changes from around the globe, to uploading and downloading information to and from the ISS crew, to even more complex tasks that required multiple decision points to process the data, track approvals and deliver it to the correct recipient across network and security boundaries. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture between several planning tools; as well as a engaging a previously research level technology (TRL 2-3) developed by Ames Research Center (ARC) that utilized an intelligent agent based system to manage and automate file traffic flow

  4. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  5. Applying the Art of Systems and Organizational Architecting in Order to Implement Operational Design into Marine Corps Planning Doctrine

    Science.gov (United States)

    2011-09-01

    Making Process OEF Operation Enduring Freedom OIF Operational Iraqi Freedom OPORDS Operational Orders RSE Rapid Systems Engineering TTPs Tactics...and Complexity, A Platform for Designing Business Architecture and elements of Rapid Systems Engineering ( RSE ) as applied by Professor Gary Langford...planning process combines elements of business design (Gharajedaghi, 2006) and RSE (Langford, 2006) to create a more robust design-planning continuum

  6. Facility Safety Plan B360 Complex Biohazardous Operations CMLS-412r0

    Energy Technology Data Exchange (ETDEWEB)

    Cooper, G

    2007-01-08

    This Addendum to the Facility Safety Plan (FSP) 360 Complex describes the safety requirements for the safe conduct of all biohazardous research operations in all buildings within the 360 complex program areas. These requirements include all the responsibilities and authorities of building personnel, operational hazards, and environmental concerns and their controls. In addition, this Addendum prescribes facility-specific training requirements and emergency controls, as well as maintenance and quality assurance requirements for ES&H-related building systems.

  7. Foresight for commanders: a methodology to assist planning for effects-based operations

    Science.gov (United States)

    Davis, Paul K.; Kahan, James P.

    2006-05-01

    Looking at the battlespace as a system of systems is a cornerstone of Effects-Based Operations and a key element in the planning of such operations, and in developing the Commander's Predictive Environment. Instead of a physical battleground to be approached with weapons of force, the battlespace is an interrelated super-system of political, military, economic, social, information and infrastructure systems to be approached with diplomatic, informational, military and economic actions. A concept that has proved useful in policy arenas other than defense, such as research and development for information technology, addressing cybercrime, and providing appropriate and cost-effective health care, is foresight. In this paper, we provide an overview of how the foresight approach addresses the inherent uncertainties in planning courses of action, present a set of steps in the conduct of foresight, and then illustrate the application of foresight to a commander's decision problem. We conclude that foresight approach that we describe is consistent with current doctrinal intelligence preparation of the battlespace and operational planning, but represents an advance in that it explicitly addresses the uncertainties in the environment and planning in a way that identifies strategies that are robust over different possible ground truths. It should supplement other planning methods.

  8. Incorporating operational flexibility into electric generation planning Impacts and methods for system design and policy analysis

    Science.gov (United States)

    Palmintier, Bryan S.

    This dissertation demonstrates how flexibility in hourly electricity operations can impact long-term planning and analysis for future power systems, particularly those with substantial variable renewables (e.g., wind) or strict carbon policies. Operational flexibility describes a power system's ability to respond to predictable and unexpected changes in generation or demand. Planning and policy models have traditionally not directly captured the technical operating constraints that determine operational flexibility. However, as demonstrated in this dissertation, this capability becomes increasingly important with the greater flexibility required by significant renewables (>= 20%) and the decreased flexibility inherent in some low-carbon generation technologies. Incorporating flexibility can significantly change optimal generation and energy mixes, lower system costs, improve policy impact estimates, and enable system designs capable of meeting strict regulatory targets. Methodologically, this work presents a new clustered formulation that tractably combines a range of normally distinct power system models, from hourly unit-commitment operations to long-term generation planning. This formulation groups similar generators into clusters to reduce problem size, while still retaining the individual unit constraints required to accurately capture operating reserves and other flexibility drivers. In comparisons against traditional unit commitment formulations, errors were generally less than 1% while run times decreased by several orders of magnitude (e.g., 5000x). Extensive numerical simulations, using a realistic Texas-based power system show that ignoring flexibility can underestimate carbon emissions by 50% or result in significant load and wind shedding to meet environmental regulations. Contributions of this dissertation include: 1. Demonstrating that operational flexibility can have an important impact on power system planning, and describing when and how these

  9. Condition-based dynamic maintenance operations planning and grouping. Application to commercial heavy vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Bouvard, K., E-mail: keomany.bouvard@volvo.co [Volvo Technology, 99 route de Lyon, 69806 Saint Priest cedex (France); Laboratoire d' Automatique de Genie Informatique et Signal - FRE3303 - Polytech' Lille, 59655 Villeneuve d' Ascq (France); Artus, S., E-mail: samuel.artus@volvo.co [Volvo Technology, 99 route de Lyon, 69806 Saint Priest cedex (France); Berenguer, C., E-mail: christophe.berenguer@utt.f [Universite de technologie de Troyes - Institut Charles Delaunay and UMR CNRS 6279 - 12, rue Marie Curie, BP2060, 10010 Troyes cedex (France); Cocquempot, V., E-mail: vincent.cocquempot@univ-lille1.f [Laboratoire d' Automatique de Genie Informatique et Signal - FRE3303 - Polytech' Lille, 59655 Villeneuve d' Ascq (France)

    2011-06-15

    This paper aims at presenting a method to optimize the maintenance planning for a commercial heavy vehicle. Such a vehicle may be considered as a multi-components system. Grouping maintenance operations related to each component reduces the global maintenance cost of the system. Classically, the optimization problem is solved using a priori reliability characteristics of components. Two types of methods may be used, i.e. static or dynamic methods. Static methods provide a fixed maintenance planning, whereas dynamic methods redefine the groups of maintenance operations at each decision time. Dynamic procedures can incorporate component information such as component states or detected failures. For deteriorating systems, reliability characteristics of each component may be estimated thanks to deterioration models and may be updated when a degradation measure is available. This additional information on degradation features allows to better follow the real state of each component and to improve the maintenance planning.

  10. A dynamic programming model for optimal planning of aquifer storage and recovery facility operations

    Science.gov (United States)

    Uddameri, V.

    2007-01-01

    Aquifer storage recovery (ASR) is an innovative technology with the potential to augment dwindling water resources in regions experiencing rapid growth and development. Planning and design of ASR systems requires quantifying how much water should be stored and appropriate times for storage and withdrawals within a planning period. A monthly scale planning model has been developed in this study to derive optimal (least cost) long-term policies for operating ASR systems and is solved using a recursive deterministic dynamic programming approach. The outputs of the model include annual costs of operation, the amount of water to be imported each month as well as the schedule for storage and extraction. A case study modeled after a proposed ASR system for Mustang Island and Padre Island service areas of the city of Corpus Christi is used to illustrate the utility of the developed model. The results indicate that for the assumed baseline demands, the ASR system is to be kept operational for a period of 4 months starting from May through August. Model sensitivity analysis indicated that increased seasonal shortages can be met using ASR with little additional costs. For the assumed cost structure, a 16% shortage increased the costs by 1.6%. However, the operation time of ASR increased from 4 to 8 months. The developed dynamic programming model is a useful tool to assess the feasibility of evaluating the use of ASR systems during regional-scale water resources planning endeavors.

  11. Harvest operations for density management: planning requirements, production, costs, stand damage, and recommendations

    Science.gov (United States)

    Loren D. Kellogg; Stephen J. Pilkerton

    2013-01-01

    Since the early 1990s, several studies have been undertaken to determine the planning requirements, productivity, costs, and residual stand damage of harvest operations in thinning treatments designed to promote development of complex forest structure in order to enhance ecological functioning and biological diversity. Th ese studies include the Oregon State...

  12. 77 FR 16676 - Approval and Promulgation of Implementation Plans and Operating Permits Program; Commonwealth of...

    Science.gov (United States)

    2012-03-22

    ... Program; Commonwealth of Puerto Rico; Administrative Changes AGENCY: Environmental Protection Agency (EPA... contained in the Commonwealth's Implementation Plan and Operating Permits Program. They do not change the... Clean Air Act (CAA or Act), the Commonwealth of Puerto Rico is regarded as a state. Generally the...

  13. 77 FR 16795 - Approval and Promulgation of Implementation Plans and Operating Permits Program; Commonwealth of...

    Science.gov (United States)

    2012-03-22

    ... Program; Commonwealth of Puerto Rico; Administrative Changes AGENCY: Environmental Protection Agency (EPA... clarity of the rules contained in the Commonwealth's Implementation Plan and Operating Permits Program... Regulations'' section of this Federal Register, EPA is approving the Commonwealth's SIP submittal as a direct...

  14. Advanced software development workstation: Object-oriented methodologies and applications for flight planning and mission operations

    Science.gov (United States)

    Izygon, Michel

    1993-01-01

    The work accomplished during the past nine months in order to help three different organizations involved in Flight Planning and in Mission Operations systems, to transition to Object-Oriented Technology, by adopting one of the currently most widely used Object-Oriented analysis and Design Methodology is summarized.

  15. Plan for the Startup of HA-21I Furnace Operations at the Plutonium Finishing Plant (PFP)

    Energy Technology Data Exchange (ETDEWEB)

    WILLIS, H.T.

    2000-02-17

    Achievement of Thermal Stabilization mission elements require the installation and startup of three additional muffle furnaces for the thermal stabilization of plutonium and plutonium bearing materials at the Plutonium Finishing Plant (PFP). The release to operate these additional furnaces will require an Activity Based Startup Review. The conduct of the Activity Based Startup Review (ABSR) was approved by Fluor Daniel Hanford on October 15, 1999. This plan has been developed with the objective of identifying those activities needed to guide the controlled startup of five furnaces from authorization to unrestricted operations by adding the HA-211 furnaces in an orderly and safe manner after the approval to Startup has been given. The Startup Plan provides a phased approach that bridges the activities between the completion of the Activity Based Startup Review authorizing the use of the three additional furnaces and the unrestricted operation of the five thermal stabilization muffle furnaces. The four phases are: (1) the initiation of five furnace operations using three empty (simulated full) boat charges from HA-211 and two full charges from HC-21C; (2) three furnace operations (one full charge from HA-211 and two full charges from HC-21C); (3) four furnace operations (two full charges from HA-211 and two full charges from HC-21C); and (4) integrated five furnace operations and unrestricted operations. Phase 1 of the Plan will be considered as the cold runs. This Plan also provides management oversight and administrative controls that are to be implemented until unrestricted operations are authorized. It also provides a formal review process for ensuring that all preparations needed for full five furnace operations are completed and formally reviewed prior to proceeding to the increased activity levels associated with five furnace operations. Specific objectives include: (1) To ensure that activities are conducted in a safe manner. (2) To provide supplemental

  16. Pre-operative planning and intra-operative guidance in modern neurosurgery: a review of 300 cases.

    Science.gov (United States)

    Wadley, J.; Dorward, N.; Kitchen, N.; Thomas, D.

    1999-01-01

    Operative neurosurgery has recently entered an exciting era of image guided surgery or neuronavigation and application of this novel technology is beginning to have a significant impact in many ways in a variety of intracranial procedures. In order to fully assess the advantages of image guided techniques over conventional planning and surgery in selected cases, detailed prospective evaluation has been carried out during the advanced development of an optically tracked neuronavigation system. Over a 2-year period, 300 operative neurosurgical procedures have been performed with the assistance of interactive image guidance, as well as the development of new software applications and hardware tools. A broad range of intracranial neurosurgical procedures were seen to benefit from image guidance, including 163 craniotomies, 53 interactive stereotactic biopsies, 7 tracked neuroendoscopies and 37 complex skull base procedures. The most common pathological diagnoses were cerebral glioma in 98 cases, meningioma in 64 and metastasis in 23. Detailed analysis of a battery of postoperative questions revealed benefits in operative planning, appreciation of anatomy, lesion location, safety of surgery and greatly enhanced surgical confidence. The authors believe that image guided surgical technology, with new developments such as those described, has a significant role to play in contemporary neurosurgery and its widespread adoption in practice will be realised in the near future. Images Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figure 7 Figure 8 Figure 9 PMID:10615186

  17. New problem with sales, inventories, and operations planning in a supply chain environment

    Science.gov (United States)

    Thomas, Andre; Lamouri, Samir

    2000-10-01

    The highest level of planning and control system is necessary, because production and logistics systems are not so flexible to follow, from day to day, sales evolutions. The companies are therefore held to standardize the good practices concerning the elaboration of their Sales, Inventories and Operations Planning (SIOP). The SIOP makes it possible to implement the strategic objectives defined by Top Management at the time of the Business Plan. It is the link between sales and manufacturing planning. The objectives of each of those depend on the specificity of their trade: the Sales Department will go for a maximum sales whereas Production will endeavor to keep industrial cost prices as low as possible while the Finance Department will try to optimize the use of available funds. There are several tools for this optimization: Graphical method and linear programming. Today, the economic context requires robust optimization.

  18. Using operations research to plan the british columbia registered nurses' workforce.

    Science.gov (United States)

    Lavieri, Mariel S; Regan, Sandra; Puterman, Martin L; Ratner, Pamela A

    2008-11-01

    The authors explore the power and flexibility of using an operations research methodology known as linear programming to support health human resources (HHR) planning. The model takes as input estimates of the future need for healthcare providers and, in contrast to simulation, compares all feasible strategies to identify a long-term plan for achieving a balance between supply and demand at the least cost to the system. The approach is illustrated by using it to plan the British Columbia registered nurse (RN) workforce over a 20-year horizon. The authors show how the model can be used for scenario analysis by investigating the impact of decreasing attrition from educational programs, changing RN-to-manager ratios in direct care and exploring how other changes might alter planning recommendations. In addition to HHR policy recommendations, their analysis also points to new research opportunities.

  19. Industrial Fuel Gas Demonstration Plant Program. Demonstration plant operation plan (Deliverable No. 38)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    The Demo Plant Operating Plan is composed of the following sequence of events starting with the training or personnel, familiarizing of the personnel with the plant and completing the long-term run in the following sequences: inspection during construction, plant completion, shakedown of equipment, process unit startup, shakedown of process units, variable run operation and a turnaround. During the construction period, technical personnel from DRC, MLGW and IGT will be at the plant site becoming familiar with the equipment, its installation and all of the auxiliaries so that on completion of construction they will be well grounded on the plant detail and its configuration. At the same time the supervisory operating personnel will have hands on training the gasifier operation at the IGT pilot plant to develop a field for gasifier operation. As a plant sections are completed, they will be checked out in accordance with the contractor and operator (client) procedure as outlined. Subsequent to this, various vendor designs and furnished equipment will be checked out operating-wise and a performance test run if feasible. The actual startup of the plant will be subsequential with the support areas as utilities, coal handling and waste treatment being placed in operation first. Subsequent to this the process units will be placed in operation starting from the rear of the process train and working forward. Thus the downstream units will be operating before the reactor is run on coal. The reactor will be checked out on coke operation.

  20. The effect of virtual reality and training on liver operation planning.

    Science.gov (United States)

    Herfarth, C; Lamadé, W; Fischer, L; Chiu, P; Cardenas, C; Thorn, M; Vetter, M; Grenacher, L; Meinzer, H P

    2002-01-01

    The three-dimensional relation of a liver tumour to the intrahepatic vascular trees is basis of operation planning in liver surgery. Yet it has not been proven whether 3D reconstruction and further computerised processing will enhance precision of operation planning in liver surgery which has been based on the liver segment classification of Couinaud up to now. Our interdisciplinary group (department of Surgery, German Cancer Research Center and Department of Radiology) has developed a new interactive computer-based quantitative 3D operation planning system for liver surgery which is being introduced into the clinical routine. The system quantifies the organ structures semiautomatically, defines resection planes depending on safety margins and the vascular trees, and presents the data in digital movies as well as in quantitative reports. We conducted a clinical trial to evaluate whether 3D reconstruction will lead to an improved operation planning. Data of 7 virtual patients were presented to a total of 81 surgeons in different levels of training. The tumours had to be assigned to a liver segment and subsequently drawn together with the operation proposals into a liver model. The precision of both was measured quantitatively for each surgeon and stratified concerning 2D and different types of 3D presentations. The 3D anatomy can be visualised in high quality which results in good perception of the third dimension (depth). Tumour assignment to liver segments was significantly correlated to the level of training (p classification of the liver segments compared to the true vascular anatomy of up to 40% were found. The impact of individual 3D-reconstruction on surgical planning has been proven to be significant and increases precision quantitatively. The merit of Couinaud's classification may be enhanced by individualisation of the segment borders in future.

  1. Heat pumps: planning, optimisation, operation and maintenance; Waermepumpen. Planung - Optimierung - Betrieb - Wartung

    Energy Technology Data Exchange (ETDEWEB)

    Kunz, P. [Kunz-Beratungen, Dietlikon (Switzerland); Afjei, T. [Fachhochschule Nordwestschweiz, Institut fuer Energie am Bau, Muttenz (Switzerland); Betschart, W.; Prochaska, V. [Hochschule Luzern, Technik und Architektur, Horw (Switzerland); Hubacher, P. [Hubacher Engineering, Engelburg (Switzerland); Loehrer, R. [Scheco AG, Winterthur (Switzerland); Mueller, A. [Mueller und Pletscher AG, Winterthur (Switzerland)

    2008-01-15

    This handbook issued by the Swiss Federal Office of Energy (SFOE) in co-operation with a trade publication takes a look at the planning, optimisation, operation and maintenance of heat pumps. First of all, the basics of heat pump technology, heat pump components and refrigerants are discussed. Then, heat sources and heat distribution are looked at, followed by chapters on the integration of heat pumps into heating systems and noise protection topics. The definition of projects, commissioning and operation of heat pump systems are then discussed. Examples of installations round off the handbook.

  2. Reliability and risk-based planning of operation and maintenance of offshore wind turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Florian, Mihai; Berzonskis, Arvydas

    2016-01-01

    costly (and safe), and it is important to include in the reliability assessment the information obtained during operation (from condition monitoring and inspections) and the maintenance performed (incl. repairs and replacements). The paper presents a risk-based approach for optimal planning of Operation...... & Maintenance of offshore wind turbines. Further, the paper considers models for uncertainty modelling and reliability assessment of structural components such as tower, blades, substructure and foundation as well as cast steel drivetrain components. The function of a wind turbine is highly dependent on many...... electrical and mechanical components as well as a control system also reliability aspects of these components are discussed in the paper. Illustrative examples are presented considering uncertainty modelling, reliability assessment and risk-based planning of Operation & Maintenance....

  3. ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

    Science.gov (United States)

    Hall, Timothy A.; Clancey, William J.; McDonald, Aaron; Toschlog, Jason; Tucker, Tyson; Khan, Ahmed; Madrid, Steven (Eric)

    2011-01-01

    In 2007 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organizations to find ways to reduce the cost of operations for supporting the International Space Station (ISS) in the Mission Control Center (MCC). Each MOD organization was asked to define and execute projects that would help them attain cost reductions by 2012. The MOD Operations Division Flight Planning Branch responded to this challenge by launching several software automation projects that would allow them to greatly improve console operations and reduce ISS console staffing and intern reduce operating costs. These tasks ranged from improving the management and integration mission plan changes, to automating the uploading and downloading of information to and from the ISS and the associated ground complex tasks that required multiple decision points. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture; as well as engaging a previously TRL 4-5 technology developed by Ames Research Center (ARC) that utilized an intelligent agent-based system to manage and automate file traffic flow, archive data, and generate console logs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the goal of eliminating a second full time ISS console support position by 2012. The team will also reduce one long range planning console position by 2014. When complete, these Flight Planning Branch projects will account for the elimination of 3 console positions and a reduction in staffing of 11 engineering personnel (EP) for ISS.

  4. Optimization and planning of operating theatre activities: an original definition of pathways and process modeling.

    Science.gov (United States)

    Barbagallo, Simone; Corradi, Luca; de Ville de Goyet, Jean; Iannucci, Marina; Porro, Ivan; Rosso, Nicola; Tanfani, Elena; Testi, Angela

    2015-05-17

    The Operating Room (OR) is a key resource of all major hospitals, but it also accounts for up 40% of resource costs. Improving cost effectiveness, while maintaining a quality of care, is a universal objective. These goals imply an optimization of planning and a scheduling of the activities involved. This is highly challenging due to the inherent variable and unpredictable nature of surgery. A Business Process Modeling Notation (BPMN 2.0) was used for the representation of the "OR Process" (being defined as the sequence of all of the elementary steps between "patient ready for surgery" to "patient operated upon") as a general pathway ("path"). The path was then both further standardized as much as possible and, at the same time, keeping all of the key-elements that would allow one to address or define the other steps of planning, and the inherent and wide variability in terms of patient specificity. The path was used to schedule OR activity, room-by-room, and day-by-day, feeding the process from a "waiting list database" and using a mathematical optimization model with the objective of ending up in an optimized planning. The OR process was defined with special attention paid to flows, timing and resource involvement. Standardization involved a dynamics operation and defined an expected operating time for each operation. The optimization model has been implemented and tested on real clinical data. The comparison of the results reported with the real data, shows that by using the optimization model, allows for the scheduling of about 30% more patients than in actual practice, as well as to better exploit the OR efficiency, increasing the average operating room utilization rate up to 20%. The optimization of OR activity planning is essential in order to manage the hospital's waiting list. Optimal planning is facilitated by defining the operation as a standard pathway where all variables are taken into account. By allowing a precise scheduling, it feeds the process of

  5. Risk Assessment Using The Homeland-Defense Operational Planning System (HOPS)

    Energy Technology Data Exchange (ETDEWEB)

    Durling, R L; Price, D E; Spero, K K

    2005-06-06

    For over ten years, the Counterproliferation Analysis and Planning System (CAPS) at Lawrence Livermore National Laboratory (LLNL) has been a planning tool used by U.S. combatant commands for mission support planning against foreign programs engaged in the manufacture of weapons of mass destruction (WMD). CAPS is endorsed by the Secretary of Defense as the preferred counterproliferation tool to be used by the nation's armed services. A sister system, the Homeland-Defense Operational Planning System (HOPS), is a new operational planning tool leveraging CAPS expertise designed to support the defense of the U.S. homeland. HOPS provides planners with a basis to make decisions to protect against acts of terrorism, focusing on the defense of facilities critical to U.S. infrastructure. Criticality of facilities, structures, and systems is evaluated on a composite matrix of specific projected casualty, economic, and sociopolitical impact bins. Based on these criteria, significant unidentified vulnerabilities are identified and secured. To provide insight into potential successes by malevolent actors, HOPS analysts strive to base their efforts mainly on unclassified open-source data. However, more cooperation is needed between HOPS analysts and facility representatives to provide an advantage to those whose task is to defend these facilities. Evaluated facilities include: refineries, major ports, nuclear power plants and other nuclear licensees, dams, government installations, convention centers, sports stadiums, tourist venues, and public and freight transportation systems. A generalized summary of analyses of U.S. infrastructure facilities will be presented.

  6. Vulnerability And Risk Assessment Using The Homeland-Defense Operational Planning System (HOPS)

    Energy Technology Data Exchange (ETDEWEB)

    Durling, Jr., R L; Price, D E; Spero, K K

    2005-01-03

    For over ten years, the Counterproliferation Analysis and Planning System (CAPS) at Lawrence Livermore National Laboratory (LLNL) has been a planning tool used by U.S. combatant commands for mission support planning against foreign programs engaged in the manufacture of weapons of mass destruction (WMD). CAPS is endorsed by the Secretary of Defense as the preferred counterproliferation tool to be used by the nation's armed services. A sister system, the Homeland-Defense Operational Planning System (HOPS), is a new operational planning tool leveraging CAPS expertise designed to support the defense of the U.S. homeland. HOPS provides planners with a basis to make decisions to protect against acts of terrorism, focusing on the defense of facilities critical to U.S. infrastructure. Criticality of facilities, structures, and systems is evaluated on a composite matrix of specific projected casualty, economic, and sociopolitical impact bins. Based on these criteria, significant unidentified vulnerabilities are identified and secured. To provide insight into potential successes by malevolent actors, HOPS analysts strive to base their efforts mainly on unclassified open-source data. However, more cooperation is needed between HOPS analysts and facility representatives to provide an advantage to those whose task is to defend these facilities. Evaluated facilities include: refineries, major ports, nuclear power plants and other nuclear licensees, dams, government installations, convention centers, sports stadiums, tourist venues, and public and freight transportation systems. A generalized summary of analyses of U.S. infrastructure facilities is presented.

  7. Orthognathic positioning system: intraoperative system to transfer virtual surgical plan to operating field during orthognathic surgery.

    Science.gov (United States)

    Polley, John W; Figueroa, Alvaro A

    2013-05-01

    To introduce the concept and use of an occlusal-based "orthognathic positioning system" (OPS) to be used during orthognathic surgery. The OPS consists of intraoperative occlusal-based devices that transfer virtual surgical planning to the operating field for repositioning of the osteotomized dentoskeletal segments. The system uses detachable guides connected to an occlusal splint. An initial drilling guide is used to establish stable references or landmarks. These are drilled on the bone that will not be repositioned adjacent to the osteotomy line. After mobilization of the skeletal segment, a final positioning guide, referenced to the drilled landmarks, is used to transfer the skeletal segment according to the virtual surgical planning. The OPS is digitally designed using 3-dimensional computer-aided design/computer-aided manufacturing technology and manufactured with stereolithographic techniques. Virtual surgical planning has improved the preoperative assessment and, in conjunction with the OPS, the execution of orthognathic surgery. The OPS has the possibility to eliminate the inaccuracies commonly associated with traditional orthognathic surgery planning and to simplify the execution by eliminating surgical steps such as intraoperative measuring, determining the condylar position, the use of bulky intermediate splints, and the use of intermaxillary wire fixation. The OPS attempts precise translation of the virtual plan to the operating field, bridging the gap between virtual and actual surgery. Copyright © 2013 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.

  8. Plan for the design, development, and implementation, and operation of the National Water Information System

    Science.gov (United States)

    Edwards, M.D.

    1987-01-01

    The Water Resources Division of the U.S. Geological Survey is developing a National Water Information System (NWIS) that will integrate and replace its existing water data and information systems of the National Water Data Storage and Retrieval System, National Water Data Exchange, National Water-Use Information, and Water Resources Scientific Information Center programs. It will be a distributed data system operated as part of the Division 's Distributed Information System, which is a network of computers linked together through a national telecommunication network known as GEONET. The NWIS is being developed as a series of prototypes that will be integrated as they are completed to allow the development and implementation of the system in a phased manner. It also is being developed in a distributed manner using personnel who work under the coordination of a central NWIS Project Office. Work on the development of the NWIS began in 1983 and it is scheduled for completion in 1990. This document presents an overall plan for the design, development, implementation, and operation of the system. Detailed discussions are presented on each of these phases of the NWIS life cycle. The planning, quality assurance, and configuration management phases of the life cycle also are discussed. The plan is intended to be a working document for use by NWIS management and participants in its design and development and to assist offices of the Division in planning and preparing for installation and operation of the system. (Author 's abstract)

  9. Optimal mechanical harvester route planning for sugarcane f ield operations using particle swarm optimization

    Directory of Open Access Journals (Sweden)

    Woraya Neungmatcha

    2015-06-01

    Full Text Available Since current agricultural production systems such as the sugarcane supply system in the sugar industry are developing towards larger and more complicated systems, there is consequently increasing use of agricultural machinery. Even though mechanization can help to increase the sugarcane yield, if the mechanical operation efficiency is low, then higher harvest costs and machinery shortages will occur. Global route planning for mechanical harvesters is one of the most important problems in the field of sugarcane harvesting and transporting operations. Improved efficiency and realistic implementation can be achieved by applying advanced planning methods for the execution of field operations, especially considering the field accessibility aspect. To address this issue, participative research was undertaken with a sugar milling company to produce and implement a mixed integer programming model that represents the mechanical harvester route plan. Particle swarm optimization was applied to find a solution to the model, leading to potential cost savings versus schedules produced manually by the mill officer. The model was also applied to explore regional planning options for a more integrated harvesting and transport system.

  10. Using model based systems engineering for the development of the Large Synoptic Survey Telescope's operational plan

    Science.gov (United States)

    Selvy, Brian M.; Claver, Charles; Willman, Beth; Petravick, Don; Johnson, Margaret; Reil, Kevin; Marshall, Stuart; Thomas, Sandrine; Lotz, Paul; Schumacher, German; Lim, Kian-Tat; Jenness, Tim; Jacoby, Suzanne; Emmons, Ben; Axelrod, Tim

    2016-08-01

    We† provide an overview of the Model Based Systems Engineering (MBSE) language, tool, and methodology being used in our development of the Operational Plan for Large Synoptic Survey Telescope (LSST) operations. LSST's Systems Engineering (SE) team is using a model-based approach to operational plan development to: 1) capture the topdown stakeholders' needs and functional allocations defining the scope, required tasks, and personnel needed for operations, and 2) capture the bottom-up operations and maintenance activities required to conduct the LSST survey across its distributed operations sites for the full ten year survey duration. To accomplish these complimentary goals and ensure that they result in self-consistent results, we have developed a holistic approach using the Sparx Enterprise Architect modeling tool and Systems Modeling Language (SysML). This approach utilizes SysML Use Cases, Actors, associated relationships, and Activity Diagrams to document and refine all of the major operations and maintenance activities that will be required to successfully operate the observatory and meet stakeholder expectations. We have developed several customized extensions of the SysML language including the creation of a custom stereotyped Use Case element with unique tagged values, as well as unique association connectors and Actor stereotypes. We demonstrate this customized MBSE methodology enables us to define: 1) the rolls each human Actor must take on to successfully carry out the activities associated with the Use Cases; 2) the skills each Actor must possess; 3) the functional allocation of all required stakeholder activities and Use Cases to organizational entities tasked with carrying them out; and 4) the organization structure required to successfully execute the operational survey. Our approach allows for continual refinement utilizing the systems engineering spiral method to expose finer levels of detail as necessary. For example, the bottom-up, Use Case

  11. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  12. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

  13. Best management practices plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This plan was prepared in support of the Phase II Remedial Design Report (DOE/OR/01-1449&D1) and in accordance with requirements under CERCLA to present the plan for best management practices to be followed during the remediation. This document provides the Environmental Restoration Program with information about spill prevention and control, water quality monitoring, good housekeeping practices, sediment and erosion control measures, and inspections and environmental compliance practices to be used during Phase II of the remediation project for the Lower East Fork Poplar Creek Operable Unit.

  14. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in this test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are {sup 99}Tc and {sup 60}Co for underwater affected by past discharges to the 216-BY Cribs, and {sup 90}Sr, {sup 239/240}Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes.

  15. User-oriented data acquisition chain task planning algorithm for operationally responsive space satellite

    Institute of Scientific and Technical Information of China (English)

    Hao Chen; Jun Li; Ning Jing

    2016-01-01

    With the development of operational y responsive space (ORS) and on-board processing techniques, the end users can receive the observation data from the ORS satel ite directly. To satisfy the demand for reducing the requirements-tasking-effects cycle from one day to hours, the various resources of the whole data acquisition chain (including satel ites, ground stations, data processing centers, users, etc.) should be taken into an overal consideration, and the traditional batch task planning mode should be transformed into the user-oriented task planning mode. Con-sidering there are many approaches for data acquisition due to the new techniques of ORS satel ite, the data acquisition chain task planning problem for ORS satel ite can be seen as the multi-modal route planning problem. Thereby, a framework is presented using label-constrained shortest path technique with the conflict resolution. To apply this framework to solve the ORS satel ite task planning problem, the preprocessing and the conflict resolution strategies are discussed in detail. Based on the above work, the user-oriented data acquisition chain task planning algorithm for ORS satel ite is proposed. The exact solution can be obtained in polynomial time using the proposed algorithm. The simulation experiments validate the feasibility and the adaptability of the pro-posed approach.

  16. Current status and science operations plan of BepiColombo MMO

    Science.gov (United States)

    Murakami, G.; Fujimoto, M.

    2016-12-01

    BepiColombo is an ESA-JAXA joint mission to Mercury with the aim to understand the process of planetary formation and evolution as well as to understand similarities and differences between the magnetospheres of Mercury and Earth. The baseline mission consists of two spacecraft, i.e. the Mercury Planetary Orbiter (MPO) and the Mercury Magnetospheric Orbiter (MMO). The two orbiters will be launched in 2018 by an Ariane-5 and arrive at Mercury in 2024. Being a spin-stabilized spacecraft, MMO has much less constraint for plasma observations and is expected to extract essential elements of space plasma physics that become visible in the Hermean environment. JAXA is responsible for the development and operations of MMO, and it's almost ready for launch. Therefore, now we can concentrate on preparing the science operations plans. MMO has large constraints on science operations, such as thermal issue and limited telemetry rate. Due to the thermal issue each science instrument cannot always be turned on. In addition, due to the low telemetry rate in average, only a part ( 20-30%) of science mission data with high resolution can be downlinked. Therefore, in order to maximize the scientific results and outcomes to be achieved by MMO, we must optimize the science observation and downlink plans in detail. In this paper, we introduce the science objectives, operations strategies and plans of MMO.

  17. Forest operations planning by using RTK-GPS based digital elevation model

    Directory of Open Access Journals (Sweden)

    Neşe Gülci

    2015-07-01

    Full Text Available Having large proportion of forests in mountainous terrain in Turkey, the logging methods that not only minimize operational costs but also minimize environmental damages should be determined in forest operations planning. In a case where necessary logging equipment and machines are available, ground slope is the most important factor in determining the logging method. For this reason, accurate, up to date, and precise ground slope data is very crucial in the success of forest operations planning. In recent years, high-resolution Digital Elevation Models (DEM can be generated for forested areas by using Real Time Kinematic (RTK GPS method and these DEMs can be used to develop precise slope maps. In this study, high-resolution DEM was developed by RTK-GPS method to generate precise slope map in a sample area. Then, the slope map was classified into slope classes specified by IUFRO in order to assist forest operations planning. According to the results, logging methods that are suitable for very steep and steep terrain conditions (i.e. skyline logging, cable pulling, and chute systems should be preferred in 48.1% of the study area. It was also found that logging methods that are suitable for terrain with medium slope (i.e. skidding and cable pulling and gentle slope (i.e. skidding and mobile winch should be preferred in 34.1% and 17.8% of the study area, respectively.

  18. 49 CFR 244.15 - Subjects to be addressed in a Safety Integration Plan not involving an amalgamation of operations.

    Science.gov (United States)

    2010-10-01

    ... ACQUISITIONS OF CONTROL Safety Integration Plans § 244.15 Subjects to be addressed in a Safety Integration Plan... 49 Transportation 4 2010-10-01 2010-10-01 false Subjects to be addressed in a Safety Integration Plan not involving an amalgamation of operations. 244.15 Section 244.15 Transportation...

  19. Reliability-Based Planning of Inspection, Operation and Maintenance for Offshore Oil & Gas Structures and Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2011-01-01

    Reliability-based cost-optimal planning of inspection, maintenance and operation has many applications. In this paper applications for planning of inspections for oil & gas jacket structures and of operation and maintenance of offshore wind turbines are described and illustrated by examples....

  20. Operational planning using Climatological Observations for Maritime Prediction and Analysis Support Service (COMPASS)

    Science.gov (United States)

    O'Connor, Alison; Kirtman, Benjamin; Harrison, Scott; Gorman, Joe

    2016-05-01

    The US Navy faces several limitations when planning operations in regard to forecasting environmental conditions. Currently, mission analysis and planning tools rely heavily on short-term (less than a week) forecasts or long-term statistical climate products. However, newly available data in the form of weather forecast ensembles provides dynamical and statistical extended-range predictions that can produce more accurate predictions if ensemble members can be combined correctly. Charles River Analytics is designing the Climatological Observations for Maritime Prediction and Analysis Support Service (COMPASS), which performs data fusion over extended-range multi-model ensembles, such as the North American Multi-Model Ensemble (NMME), to produce a unified forecast for several weeks to several seasons in the future. We evaluated thirty years of forecasts using machine learning to select predictions for an all-encompassing and superior forecast that can be used to inform the Navy's decision planning process.

  1. Operational flow visualization techniques in the Langley Unitary Plan Wind Tunnel

    Science.gov (United States)

    Corlett, W. A.

    1982-01-01

    The unitary plan wind tunnel (UPWT) uses in daily operation are shown. New ideas for improving the quality of established flow visualization methods are developed and programs on promising new flow visualization techniques are pursued. The unitary plan wind tunnel is a supersonic facility, referred to as a production facility, although the majority of tests are inhouse basic research investigations. The facility has two 4 ft. by 4 ft. test sections which span a Mach range from 1.5 to 4.6. The cost of operation is about $10 per minute. Problems are the time required for a flow visualization test setup and investigation costs and the ability to obtain consistently repeatable results. Examples of sublimation, vapor screen, oil flow, minitufts, schlieren, and shadowgraphs taken in UPWT are presented. All tests in UPWT employ one or more of the flow visualization techniques.

  2. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  3. Optimal Planning and Operation Management of a Ship Electrical Power System with Energy Storage System

    DEFF Research Database (Denmark)

    Anvari-Moghaddam, Amjad; Dragicevic, Tomislav; Meng, Lexuan

    2016-01-01

    for the proposed plan is derived based on the solution from a mixed-integer nonlinear programming (MINLP) problem. Simulation results showed that including well-sized energy storage options together with optimal operation management of generating units can improve the economic operation of the test system while...... problems to shipboard systems where some means of generation and storage are also schedulable. First, the question of whether or how much energy storage to include into the system is addressed. Both the storage power rating in MW and the capacity in MWh are optimized. Then, optimal operating strategy......Next generation power management at all scales is highly relying on the efficient scheduling and operation of different energy sources to maximize efficiency and utility. The ability to schedule and modulate the energy storage options within energy systems can also lead to more efficient use...

  4. Applying 3D-printing technology in planning operations of cancer patients

    Science.gov (United States)

    Kashapov, L. N.; N, A. N. Rudyk A.; Kashapov, R. N.

    2014-12-01

    The purpose of this work was creation 3D model of the front part of the skull of the patient and evaluates the effectiveness of its use in the planning of the operation. To achieve this goal was chosen an operation to remove a tumor of the right eyelid, germinate in the zygomatic bone. 3D printing was performed at different peripheral devices using the method of layering creating physical objects by a digital 3D model as well as the recovery model of the skull with the entire right malar bone for fixation on her titanium frame to maintain the eyeball in a fixed state.

  5. Continuity of Operations Plans: Policy and Strategy for K-12 Schools in the State of Florida

    Science.gov (United States)

    2011-12-01

    Standard Operating Procedure TT&E Test, Training and Exercise USDOE United States Department of Education WTC World Trade Center x THIS...programs without the means or plans to do so, which was evidenced by the terrorist attacks that resulted in the destruction and loss of the several...Prior to September 11, 2001, no one considered such an attack on the World Trade Center ( WTC ) occurring, much less utilizing fueled aircraft as manned

  6. A case method for Sales and Operations Planning: a learning experience from Germany

    OpenAIRE

    Luiz Felipe Scavarda; Bernd Hellingrath; Tobias Kreuter; Antonio Márcio Tavares Thomé; Marcelo Xavier Seeling; Jan-Hendrick Fischer; Raquel Mello

    2017-01-01

    Abstract Adequate preparation, learning, and training is required for Sales and Operations Planning (S&OP) to aid organizations in achieving the full expected benefits from its implementation. This paper presents a case method for S&OP and the learning experience of its application at the University of Münster (Germany). The “constructive alignment principle” was applied with a “team teaching” approach, involving an executive from the case company. Students improved th...

  7. Planning Considerations for a Future Operational Campaign in NATO’s Central Region

    Science.gov (United States)

    1992-01-31

    scale military operations. At the same time, many of these alternatives are not covered by extant military plans and NATO planners will face a tabula ... rasa from which to draw guidance. Moreover, many of these options fall outside traditional military missions or do not lend themselves strictly to the...systems and information, logistics capabilities, or transportation assets. On the other hand, if the United States desires a more positive role in the

  8. Operations and Maintenance Concept Plan for the Immobilized High Level Waste (IHLW) Interim Storage Facility

    Energy Technology Data Exchange (ETDEWEB)

    JANIN, L.F.

    2000-08-30

    This O&M Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design.

  9. Congenital hip disease in adults: terminology, classification, pre-operative planning and management.

    Science.gov (United States)

    Karachalios, T; Hartofilakidis, G

    2010-07-01

    This paper reviews the current knowledge relating to the management of adult patients with congenital hip disease. Orthopaedic surgeons who treat these patients with a total hip replacement should be familiar with the arguments concerning its terminology, be able to recognise the different anatomical abnormalities and to undertake thorough pre-operative planning in order to replace the hip using an appropriate surgical technique and the correct implants and be able to anticipate the clinical outcome and the complications.

  10. Using Micro-Synchrophasor Data for Advanced Distribution Grid Planning and Operations Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, Emma [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Kiliccote, Sila [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); McParland, Charles [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Roberts, Ciaran [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2014-07-01

    This report reviews the potential for distribution-grid phase-angle data that will be available from new micro-synchrophasors (µPMUs) to be utilized in existing distribution-grid planning and operations analysis. This data could augment the current diagnostic capabilities of grid analysis software, used in both planning and operations for applications such as fault location, and provide data for more accurate modeling of the distribution system. µPMUs are new distribution-grid sensors that will advance measurement and diagnostic capabilities and provide improved visibility of the distribution grid, enabling analysis of the grid’s increasingly complex loads that include features such as large volumes of distributed generation. Large volumes of DG leads to concerns on continued reliable operation of the grid, due to changing power flow characteristics and active generation, with its own protection and control capabilities. Using µPMU data on change in voltage phase angle between two points in conjunction with new and existing distribution-grid planning and operational tools is expected to enable model validation, state estimation, fault location, and renewable resource/load characterization. Our findings include: data measurement is outstripping the processing capabilities of planning and operational tools; not every tool can visualize a voltage phase-angle measurement to the degree of accuracy measured by advanced sensors, and the degree of accuracy in measurement required for the distribution grid is not defined; solving methods cannot handle the high volumes of data generated by modern sensors, so new models and solving methods (such as graph trace analysis) are needed; standardization of sensor-data communications platforms in planning and applications tools would allow integration of different vendors’ sensors and advanced measurement devices. In addition, data from advanced sources such as µPMUs could be used to validate models to improve

  11. Planning Matters: Response Operations following the 30 September 2009 Sumatran Earthquake

    Science.gov (United States)

    Comfort, L. K.; Cedillos, V.; Rahayu, H.

    2009-12-01

    Response operations following the 9/30/2009 West Sumatra earthquake tested extensive planning that had been done in Indonesia since the 26 December 2004 Sumatran Earthquake and Tsunami. After massive destruction in Aceh Province in 2004, the Indonesian National Government revised its national disaster management plans. A key component was to select six cities in Indonesia exposed to significant risk and make a focused investment of resources, planning activities, and public education to reduce risk of major disasters. Padang City was selected for this national “showcase” for disaster preparedness, planning, and response. The question is whether planning improved governmental performance and coordination in practice. There is substantial evidence that disaster preparedness planning and training initiated over the past four years had a positive effect on Padang in terms of disaster risk reduction. The National Disaster Management Agency (BNPB, 10/28/09) reported the following casualties: Padang City: deaths, 383; severe injuries, 431, minor injuries, 771. Province of West Sumatra: deaths, 1209; severe injuries, 67; minor injuries, 1179. These figures contrasted markedly with the estimated losses following the 2004 Earthquake and Tsunami when no training had been done: Banda Aceh, deaths, 118,000; Aceh Province, dead/missing, 236,169 (ID Health Ministry 2/22/05). The 2004 events were more severe, yet the comparable scale of loss was significantly lower in the 9/30/09 earthquake. Three factors contributed to reducing disaster risk in Padang and West Sumatra. First, annual training exercises for tsunami warning and evacuation had been organized by national agencies since 2004. In 2008, all exercises and training activities were placed under the newly established BNPB. The exercise held in Padang in February, 2009 served as an organizing framework for response operations in the 9/30/09 earthquake. Public officers with key responsibilities for emergency operations

  12. Visual analysis of uncertainties in ocean forecasts for planning and operation of off-shore structures

    KAUST Repository

    Hollt, Thomas

    2013-02-01

    We present a novel integrated visualization system that enables interactive visual analysis of ensemble simulations used in ocean forecasting, i.e, simulations of sea surface elevation. Our system enables the interactive planning of both the placement and operation of off-shore structures. We illustrate this using a real-world simulation of the Gulf of Mexico. Off-shore structures, such as those used for oil exploration, are vulnerable to hazards caused by strong loop currents. The oil and gas industry therefore relies on accurate ocean forecasting systems for planning their operations. Nowadays, these forecasts are based on multiple spatio-temporal simulations resulting in multidimensional, multivariate and multivalued data, so-called ensemble data. Changes in sea surface elevation are a good indicator for the movement of loop current eddies, and our visualization approach enables their interactive exploration and analysis. We enable analysis of the spatial domain, for planning the placement of structures, as well as detailed exploration of the temporal evolution at any chosen position, for the prediction of critical ocean states that require the shutdown of rig operations. © 2013 IEEE.

  13. Utilizing Strategic and Operational Methods for Whole-Community Disaster Planning.

    Science.gov (United States)

    Franks, Stevee; Seaton, Ellen

    2017-05-08

    Analysis of response and recovery efforts to disasters over the past 2 decades has identified a consistent gap that plagues the nation in regard to persons with access and functional needs. This gap can be highlighted by Hurricane Katrina, where the majority of those killed were a part of the access and functional needs population. After a disaster, many individuals with access and functional needs require assistance recovering but often have difficulty accessing services and resources. These difficulties are due to a combination of issues, such as health problems and the disruption of community support services. We sought to help bridge this gap by focusing on strategic and operational methods used while planning for the whole community. This article highlights the many partnerships that must be fostered for successful whole-community planning. These partnerships include, but are not limited to, local government departments, health agencies, nonprofit and nongovernmental organizations, and other volunteer organizations. We showcase these methods by using a developmental Post-Disaster Canvassing Plan to highlight planning methods that may aid jurisdictions across the United States in disaster planning for the whole community. (Disaster Med Public Health Preparedness. 2017;page 1 of 6).

  14. Comparative analysis of operational forecasts versus actual weather conditions in airline flight planning, volume 2

    Science.gov (United States)

    Keitz, J. F.

    1982-01-01

    The impact of more timely and accurate weather data on airline flight planning with the emphasis on fuel savings is studied. This volume of the report discusses the results of Task 2 of the four major tasks included in the study. Task 2 compares various catagories of flight plans and flight tracking data produced by a simulation system developed for the Federal Aviation Administrations by SRI International. (Flight tracking data simulate actual flight tracks of all aircraft operating at a given time and provide for rerouting of flights as necessary to resolve traffic conflicts.) The comparisons of flight plans on the forecast to flight plans on the verifying analysis confirm Task 1 findings that wind speeds are generally underestimated. Comparisons involving flight tracking data indicate that actual fuel burn is always higher than planned, in either direction, and even when the same weather data set is used. Since the flight tracking model output results in more diversions than is known to be the case, it was concluded that there is an error in the flight tracking algorithm.

  15. Zero Gravity Flights as the Most Effective Embryonic Operation for Planned Commercial Spaceport

    Science.gov (United States)

    Abu Samah, Shamsul Kamar; Ridzuan Zakaria, Norul; Nasrun, Nasri; Abu, Jalaluddin; Muszaphar Shukor, Dato'Sheikh

    2013-09-01

    From the experience gained by the management team of Spaceport Malaysia, a popular service that can be provided by a planned commercial spaceport in a country without existing space travel infrastructure are zero gravity flights. Zero gravity flights range from parabolic flights using aerobatic airplane to suborbital flights using rockets, and in the near future using suborbital rocketplanes. Therefore, zero gravity flights can be operated from a certified runway or planned for operation at a future commercial spaceport. With such range of operation, zero gravity flights provide a natural link between a low cost operation of small airplane to exclusive high profile operation of suborbital rocketplane, and this attracts the attention of individuals and organizations that are planning for the establishment of a commercial spaceport. This is the approach chosen by the planners and developers of Spaceport Malaysia. A significant factor in zero gravity flight is the zero gravity time, the period where the payload onboard the airplane or rocketplane will experience zero gravity. Based on the momentum of the airplane or rocketplane, the zero gravity time may vary from few seconds to few minutes and that determines the quality of the zero gravity flight. To achieve zero gravity, the airplane or rocketplane will fly with a steady velocity for a significant time as a gravity control flight, accelerate upwards with an angle producing hypergravity and perform parabolic flight with natural momentum producing zero gravity and followed by dive that will result in another hypergravity flight. 2 zero gravity platforms being considered for operation at and by Spaceport Malaysia are F-5E Tiger II and Airbus A300, since both platforms have been successfully used by a partner of Spaceport Malaysia in performing zero gravity flights. An F-5E fighter jet owned by Royal Malaysian Air Force is being planned to be converted into a zero gravity platform to be operated at and by Spaceport

  16. Integrated Hatchery Operations Team: Operations Plans for Anadromous Fish Production Facilities in the Columbia River Basin, Volume IV of V; 1992 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Peck, Larry

    1993-04-01

    Operational plans for Cowlitz, Elokomin, Grays River, Kalama Falls, Lewis River and Speelyai, Lower Kalama, Lyons Ferry, Methow, Priest Rapids, Ringold Springs, Rock Island, Toutle, Washougal, and Wells Salmon Hatcheries are individually described.

  17. Approach to Issues in Planning and Operation of Railway BOT Projects

    Institute of Scientific and Technical Information of China (English)

    Zhao Xianghong; Chen Min

    2009-01-01

    As an internationally popular mode of public infrastructures' investment,construction and operation,BOT (build-operate-transfer) has been successfully applied in some countries and regions of the world for their infrastructures' construction and playing an important role in promoting the construction of public infrastructures.The Ministry of Railways clearly proposed in its Suggestions for Implementation of Encouraging,Supporting and Guiding Participation of Non-public-owned Economy in Railway Construction and Operation that it was necessary to study and take for reference multiple modes of public infrastructures'investment,construction and operation including BOT.It is more complicated and risky for the process of planning and operation of BOT projects.The paper takes for reference the domestic and foreign experiences in the operation of BOT projects,analyzes the issues that will arise such as risk control in implementing railway BOT projects,employment of professional consultants,financing coordination,tariff making,non-commercial subsidy,as well as operation and management,and puts forward corresponding suggestions for these issues.

  18. 1997 annual ground control operating plan for the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    This plan presents background information and a working guide to assist Mine Operations and Engineering in developing strategies for addressing ground control issues at the Waste Isolation Pilot Plant (WIPP). With the anticipated receipt of waste in late 1997, this document provides additional detail to Panel 1 activities and options. The plan also serves as a foundation document for development and revision of the annual long-term ground control plan. Section 2.0 documents the current status of all underground excavations with respect to location, geology, geometry, age, ground support, operational use, projected life, and physical conditions. Section 3.0 presents the methods used to evaluate ground conditions, including visual observations of the roof, ribs, and floor, inspection of observation holes, and review of instrumentation data. Section 4.0 lists several ground support options and specific applications of each. Section 5.0 discusses remedial ground control measures that have been implemented to date. Section 6.0 presents projections and recommendations for ground control actions based on the information in Sections 2.0 through 5.0 of this plan and on a rating of the critical nature of each specific area. Section 7.0 presents a summary statement, and Section 8.0 includes references. Appendix A provides an overview and critique of ground control systems that have been, or may be, used at the site. Because of the dynamic nature of the underground openings and associated geotechnical activities, this plan will be revised as additional data are incorporated.

  19. Planning and operating energy efficient factories; Energieeffiziente Fabriken planen und betreiben

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Egon; Strauch, Joerg [Technische Univ. Chemnitz (Germany). Professur fuer Fabrikplanung und Fabrikbetrieb; Engelmann, Joerg [Volkswagen Sachsen GmbH, Zwickau (Germany). Werktechnik / Umweltplanung; Loeffler, Thomas [Technische Univ. Chemnitz (Germany). Professur fuer Fabrikplanung und Fabrikbetrieb; IREGIA e.V., Chemnitz (Germany)

    2009-07-01

    This book presents systematic approaches to developing energy saving potentials in the planning and operation of factories. The authors describe the drivers of the current energy debate and the state of the art in making factories energy efficient. They explain important principles that must be observed in considering factories as a system and in order to understand questions relating to energy. They have developed methods for finding appropriate energy-efficient solutions in factory planning. Detailed explanations are given on energy-relevant installations which require planning such as drives, compressed air systems or ventilation systems. The book presents methods and instruments for the analysis and evaluation of energy consumption which can be used for assessment purposes during the initial planning as well as for monitoring and influencing energy consumption during normal operation. Selected practical examples, notably from the automotive industry, serve to illustrate the material presented. The book is intended primarily for planning and production engineers in the piece goods industry as well as for students in related fields. [German] Das Buch zeigt auf, wie beim Planen und Betreiben von Fabriken systematisch Potenziale fuer Energieeinsparungen erschlossen werden koennen. Die Autoren beschreiben die Treiber der aktuellen Energiedebatte und den Status Quo der ''Energieeffizienten Fabrik''. Sie erlaeutern wichtige Grundlagen, um die Fabrik als System und energetische Zusammenhaenge zu verstehen. Eine von ihnen entwickelte Methodik hilft, bereits bei der Planung von Fabriken adaequate energieeffiziente Loesungen zu finden. Energierelevante Planungsobjekte wie elektrische Antriebe, Druckluft- oder Lueftungssysteme werden naeher erlaeutert. Fuer die Analyse und Bewertung des Energieverbrauchs werden Methoden und Instrumente vorgestellt, mit denen sowohl die Ausgangsituation bei der Planung beurteilt als auch der Energieverbrauch im

  20. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Energy Technology Data Exchange (ETDEWEB)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  1. National Ignition Facility start-up/operations engineering and special equipment construction health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    Huddleston, P C

    1998-05-08

    This document sets forth the responsibilities, interfaces, guidelines, rules, policy, and regulations for all workers involved in the S/O and SE construction, installation, and acceptance testing. This document is enforced from the first day that S/O and SE workers set foot on the NIF construction site until the end of the Project at Critical Decision 4. This document is applicable only to site activities, which are defined as those that occur within the perimeter of the fenced-off NIF construction zone and the Target Chamber Assembly Area (Helipad). The associated Special Equipment laydown and construction support areas listed in Appendix B are not under this plan; their safety provisions are discussed in the Appendix. Prototype and other support activities, such as the Amplifier Laboratory and Frame Assembly Unit assembly area, are not included in this plan. After completion of the Operational Readiness Review, the Facility Safety Procedure, Operational Safety Requirements, and Operational Safety Procedures are the governing safety documents for the operating facility. The S/O and SE project elements are required to implement measures that create a universal awareness of and promote safe job practices at the site. This includes all Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory, Sandia National Laboratories, University of Rochester, supplement labor organization, and subcontractor employees; visitors; and guests serving the S/O and SE effort.

  2. National Ignition Facility start-up/operations engineering and special equipment construction health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    Huddleston, P C

    1998-05-08

    This document sets forth the responsibilities, interfaces, guidelines, rules, policy, and regulations for all workers involved in the S/O and SE construction, installation, and acceptance testing. This document is enforced from the first day that S/O and SE workers set foot on the NIF construction site until the end of the Project at Critical Decision 4. This document is applicable only to site activities, which are defined as those that occur within the perimeter of the fenced-off NIF construction zone and the Target Chamber Assembly Area (Helipad). The associated Special Equipment laydown and construction support areas listed in Appendix B are not under this plan; their safety provisions are discussed in the Appendix. Prototype and other support activities, such as the Amplifier Laboratory and Frame Assembly Unit assembly area, are not included in this plan. After completion of the Operational Readiness Review, the Facility Safety Procedure, Operational Safety Requirements, and Operational Safety Procedures are the governing safety documents for the operating facility. The S/O and SE project elements are required to implement measures that create a universal awareness of and promote safe job practices at the site. This includes all Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory, Sandia National Laboratories, University of Rochester, supplement labor organization, and subcontractor employees; visitors; and guests serving the S/O and SE effort.

  3. CT pre-operative planning of a new semi-implantable bone conduction hearing device

    Energy Technology Data Exchange (ETDEWEB)

    Law, Eric K.C.; Bhatia, Kunwar S.S. [Prince of Wales Hospital, The Chinese University of Hong Kong, Department of Imaging and Interventional Radiology, Hong Kong, SAR (China); Tsang, Willis S.S.; Tong, Michael C.F. [Prince of Wales Hospital, The Chinese University of Hong Kong, Department of Otorhinolaryngology, Head and Neck Surgery, Hong Kong, SAR (China); Shi, Lin [The Chinese University of Hong Kong, Department of Medicine and Therapeutics, Hong Kong, SAR (China); The Chinese University of Hong Kong, Chow Yuk Ho Technology Center for Innovative Medicine, Hong Kong, SAR (China)

    2016-06-15

    Accommodating a novel semi-implantable bone conduction hearing device within the temporal bone presents challenges for surgical planning. This study describes the utility of CT in pre-operative assessment of such an implant. Retrospective review of pre-operative CT, clinical and surgical records of 16 adults considered for device implantation. Radiological suitability was assessed on CT using 3D simulation software. Antero-posterior (AP) dimensions of the mastoid bone and minimum skull thickness were measured. CT planning results were correlated with operative records. Eight and five candidates were suitable for device placement in the transmastoid and retrosigmoid positions, respectively, and three were radiologically unsuitable. The mean AP diameter of the mastoid cavity was 14.6 mm for the transmastoid group and 4.6 mm for the retrosigmoid group (p < 0.05). Contracted mastoid and/or prior surgery were predisposing factors for unsuitability. Four transmastoid and five retrosigmoid positions required sigmoid sinus/dural depression and/or use of lifts due to insufficient bone capacity. A high proportion of patients being considered have contracted or operated mastoids, which reduces the feasibility of the transmastoid approach. This finding combined with the complex temporal bone geometry illustrates the importance of careful CT evaluation using 3D software for precise device simulation. (orig.)

  4. Cassini Information Management System in Distributed Operations Collaboration and Cassini Science Planning

    Science.gov (United States)

    Equils, Douglas J.

    2008-01-01

    Launched on October 15, 1997, the Cassini-Huygens spacecraft began its ambitious journey to the Saturnian system with a complex suite of 12 scientific instruments, and another 6 instruments aboard the European Space Agencies Huygens Probe. Over the next 6 1/2 years, Cassini would continue its relatively simplistic cruise phase operations, flying past Venus, Earth, and Jupiter. However, following Saturn Orbit Insertion (SOI), Cassini would become involved in a complex series of tasks that required detailed resource management, distributed operations collaboration, and a data base for capturing science objectives. Collectively, these needs were met through a web-based software tool designed to help with the Cassini uplink process and ultimately used to generate more robust sequences for spacecraft operations. In 2001, in conjunction with the Southwest Research Institute (SwRI) and later Venustar Software and Engineering Inc., the Cassini Information Management System (CIMS) was released which enabled the Cassini spacecraft and science planning teams to perform complex information management and team collaboration between scientists and engineers in 17 countries. Originally tailored to help manage the science planning uplink process, CIMS has been actively evolving since its inception to meet the changing and growing needs of the Cassini uplink team and effectively reduce mission risk through a series of resource management validation algorithms. These algorithms have been implemented in the web-based software tool to identify potential sequence conflicts early in the science planning process. CIMS mitigates these sequence conflicts through identification of timing incongruities, pointing inconsistencies, flight rule violations, data volume issues, and by assisting in Deep Space Network (DSN) coverage analysis. In preparation for extended mission operations, CIMS has also evolved further to assist in the planning and coordination of the dual playback redundancy of

  5. Constructing Hongqiao Hub and Serving Regional Economy:Planning and Operation of Hongqiao Comprehensive Transportation Hub

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    Taking Hongqiao Integrated Transportation Hub Project as a case, this paper introduces its origin, orientation, development programming, planning and design, road planning, information system planning, air-rail integrated transportation planning, disaster prevention planning, and so on.

  6. Incorporating voltage security into the planning, operation and monitoring of restructured electric energy markets

    Science.gov (United States)

    Nair, Nirmal-Kumar

    As open access market principles are applied to power systems, significant changes are happening in their planning, operation and control. In the emerging marketplace, systems are operating under higher loading conditions as markets focus greater attention to operating costs than stability and security margins. Since operating stability is a basic requirement for any power system, there is need for newer tools to ensure stability and security margins being strictly enforced in the competitive marketplace. This dissertation investigates issues associated with incorporating voltage security into the unbundled operating environment of electricity markets. It includes addressing voltage security in the monitoring, operational and planning horizons of restructured power system. This dissertation presents a new decomposition procedure to estimate voltage security usage by transactions. The procedure follows physical law and uses an index that can be monitored knowing the state of the system. The expression derived is based on composite market coordination models that have both PoolCo and OpCo transactions, in a shared stressed transmission grid. Our procedure is able to equitably distinguish the impacts of individual transactions on voltage stability, at load buses, in a simple and fast manner. This dissertation formulates a new voltage stability constrained optimal power flow (VSCOPF) using a simple voltage security index. In modern planning, composite power system reliability analysis that encompasses both adequacy and security issues is being developed. We have illustrated the applicability of our VSCOPF into composite reliability analysis. This dissertation also delves into the various applications of voltage security index. Increasingly, FACT devices are being used in restructured markets to mitigate a variety of operational problems. Their control effects on voltage security would be demonstrated using our VSCOPF procedure. Further, this dissertation investigates

  7. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  8. A test case of computer aided motion planning for nuclear maintenance operation

    Energy Technology Data Exchange (ETDEWEB)

    Schmitzberger, E.; Bouchet, J.L. [Electricite de France (EDF), Dept. Surveillance Diagnostic Maintenance, 78 - Chatou (France); Schmitzberger, E. [Institut National Polytechnique, CRAN, 54 - Vandoeuvre les Nancy (France)

    2001-07-01

    Needs for improved tools for nuclear power plant maintenance preparation are expressed by EDF engineering. These are an easier and better management of logistics constraints such as free spaces for motions or handling tasks. The lack of generic or well suited tools and the specificity of nuclear maintenance operation have led EDF R and D to develop its own motion planning tools in collaboration with LAAS-CNRS, Utrecht University and the software publisher CADCENTRE within the framework of the three years Esprit LTR project MOLOG. EDF users needs will be summed up in the first part of the paper under the title ''Motion feasibility studies for maintenance operation'' and then compared to the current industrial offer in the ''Software's background'''s part. The definition and objectives ''Towards motion planning tools'' follows. It explains why maintenance preparation pertains to automatic motion planning and how it makes studies much simpler. The ''MOLOG's Benchmark and first result'''s part describes the test-case used to evaluate the MOLOG project and gives an outlook at the results obtained so far. (author)

  9. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided.

  10. 100-OL-1 Operable Unit Field Portable X-Ray Fluorescence (XRF) Analyzer Pilot Study Plans

    Energy Technology Data Exchange (ETDEWEB)

    Bunn, Amoret L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fritz, Brad G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wellman, Dawn M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-07-01

    A pilot study is being conducted to support the approval of the Remedial Investigation/Feasibility Study (RI/FS) Work Plan to evaluate the 100-OL-1 Operable Unit (OU) pre-Hanford orchard lands. Based on comments received by the U.S. Environmental Protection Agency (EPA) and Washington State Department of Ecology, the pilot study will evaluate the use of field portable X-ray fluorescence (XRF) spectrometry measurements for evaluating lead and arsenic concentrations on the soil surface as an indicator of past use of lead arsenate pesticide residue in the OU. The work will be performed in the field during the summer of 2014, and assist in the planning for the characterization activities in the RI/FS.

  11. INL SITEWIDE INSTITUTIONAL CONTROLS, AND OPERATIONS AND MAINTENANCE PLAN FOR CERCLA RESPONSE ACTIONS

    Energy Technology Data Exchange (ETDEWEB)

    JOLLEY, WENDELL L

    2008-02-05

    On November 9, 2002, the U.S. Environmental Protection Agency, the U.S. Department of Energy, and the Idaho Department of Environmental Quality approved the 'Record of Decision Experimental Breeder Reactor-I/Boiling Water Reactor Experiment Area and Miscellaneous Sites', which required a Site-wide institutional controls plan for the then Idaho National Engineering and Environmental Laboratory (now known as the Idaho National Laboratory). This document, first issued in June 2004, fulfilled that requirement. This revision identifies and consolidates the institutional controls and operations and maintenance requirements into a single document.

  12. Discussion of Planning and Operating of Chongming Qianwei Village's Nongjiale tourism site

    Science.gov (United States)

    Guo, Qingqing; Liu, Min

    According to the sufficient market research the paper put forward the Construction and operation of Chongming Qianwei village Nongjiale tour website completed the Building program of this Business Website. Through needs analysis and feasibility analysis, this paper proposed business model for the target system, transaction mode, revenue model and competitive edge. Opening of the bridge which contact Shanghai and Chongming, coming of the shanghai expo; will bring the growth of passenger traffic of chongming's tourism industry. This article is based on this background, discussing the exploitation and plan of tour website of ChongMing, Enhancing the Popularity and Competitiveness of Chongming's Tourism.

  13. Planned Operation of Tritium Recovery System Based on Investigation of LHD Exhaust System

    Science.gov (United States)

    Asakura, Yamato; Suzuki, Naoyuki

    To understand the conditions of exhaust gas treatment at the transition point between the Large Helical Device (LHD) vacuum pumping system and the exhaust gas tritium recovery system, the gas flow rate and hydrogen concentration were measured. Simultaneous measurement of the exhaust gas flow rate and hydrogen concentration was made possible by applying two types of hydrogen monitors: a thermal conductivity sensor and a combustible gas sensor. The obtained results have led to remodeling of the LHD vacuum pumping system and an optimised plan of operation for the tritium recovery system.

  14. Essays on strategy: hostage rescue planning; maritime theater nuclear capability; strategic psychological operations

    Energy Technology Data Exchange (ETDEWEB)

    Brauer, R.F.; Thomas, R.E.; Kriesel, M.E.

    1985-01-01

    The essays in the volume won recognition in the 1984 Joint Chiefs of Staff Strategy Essay Competition. The volume contains three essays. The author of the first essay considers the requirements for successful planning of hostage rescues, specifically reviewing the Son Tay raid, the Mayaguez crisis, the Entebbe rescue, and the Iranian hostage rescue attempt. The author of the second essay looks at the US Navy's capability for maritime theater nuclear warfare, identifying problems and recommending improvements. The author of the third essay finds the United States lacking a national-level mechanism for coordinating military psychological operations and proposes a way to remedy the problem.

  15. Wolf Management Operational Plan Game Management Unit 15A Northern Portion of the Kenai National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The purpose of this operational plan is to establish a wolf management strategy for the Kenai National Wildlife Refuge that will be jointly implemented by the Fish...

  16. Space Station Operations Would Extend Until at Least 2024 Under Obama Plan

    Science.gov (United States)

    Showstack, Randy

    2014-01-01

    An 8 January decision by the White House to propose an extension of the International Space Station's (ISS) operation until at least 2024 would allow for increased research on board the floating laboratory, a longer planning horizon for commercial activities, and a continuation of international cooperation in space, administration officials said. The proposal, which has received initial support from some key members of Congress, would be the second extension for ISS under the Obama administration and would accommodate increased research related to long-duration human space flight, Earth science, and other areas. ISS, which in the United States is authorized under the NASA Authorization Act of 2010, was last extended in 2010 and costs about $3 billion annually to operate.

  17. Metropolis Parking Problems and Management Planning Solutions for Traffic Operation Effectiveness

    Directory of Open Access Journals (Sweden)

    Yuejun Liu

    2012-01-01

    Full Text Available Advances in mobility are clearly illustrated by the rapid development of urbanization and motorization in developing countries. Following the dramatic incensement of traffic demand, the parking problem has been becoming much more seriously important in many metropolises. With the aim of seeking solutions as to how the parking system could operate more efficiently by using new technologies and new methodologies, this paper discusses the application of geographic information system into the parking planning and management for traffic operation effectiveness in metropolis. The concentration of this paper includes the characteristics of parking demand and the causations of parking problems, especially the basic parking principle and strategies for solving parking problems from the perspective of geographic information system are discussed in enough detail in this paper.

  18. PMU Frequency Data Processing for A Planned Islanding Operation in Bornholm

    DEFF Research Database (Denmark)

    (PMU) system in Bornholm during the planned islanding operation first, as it has high time resolution and it is synchronized to Global Position System (GPS). However, there were some problems with the PMU system during the islanding period, which made the data not as complete as expected. This paper...... describes the problems and provides proposals for a data processing procedure to ensure that the improved frequency data are acceptable for statistics analysis. The proposed data processing procedure is described and evaluated. Furthermore, this paper provides a reference for future PMU data acquisition...... and processing. Individually, section I in the paper generally describes the background for islanding operation and the Bornholm system. Section II introduces the installed PMU measurement system, followed by section III, which describes the PMU original frequency data, the problems during the acquisition...

  19. Stochastic Dynamic Programming Applied to Hydrothermal Power Systems Operation Planning Based on the Convex Hull Algorithm

    Directory of Open Access Journals (Sweden)

    Bruno H. Dias

    2010-01-01

    Full Text Available This paper presents a new approach for the expected cost-to-go functions modeling used in the stochastic dynamic programming (SDP algorithm. The SDP technique is applied to the long-term operation planning of electrical power systems. Using state space discretization, the Convex Hull algorithm is used for constructing a series of hyperplanes that composes a convex set. These planes represent a piecewise linear approximation for the expected cost-to-go functions. The mean operational costs for using the proposed methodology were compared with those from the deterministic dual dynamic problem in a case study, considering a single inflow scenario. This sensitivity analysis shows the convergence of both methods and is used to determine the minimum discretization level. Additionally, the applicability of the proposed methodology for two hydroplants in a cascade is demonstrated. With proper adaptations, this work can be extended to a complete hydrothermal system.

  20. Investigating the efficacy of an intelligent operation planning and support tool for acute healthcare contexts.

    Science.gov (United States)

    Wickramasinghe, Nilmini; Kent, Bridie; Moghimi, Fatemeh Hoda; Nguyen, Lemai; Redley, Bernice; Taylor, Nyree; Muhammed, Imran; Botti, Mari

    2013-01-01

    Nurses are the largest group of healthcare professionals in hospitals providing 24-hour care to patients. Hence, nurses are pivotal in coordinating and communicating patient care information in the complex network of healthcare professionals, services and other care processes. Yet, despite nurses' central role in health care delivery, intelligent systems have historically rarely been designed around nurses' operational needs. This could explain the poor integration of technologies into nursing work processes and consequent rejection by nursing professionals. The complex nature of acute care delivery in hospitals and the frequently interrupted patterns of nursing work suggest that nurses require flexible intelligent systems that can support and adapt to their variable workflow patterns. This study is designed to explore nurses' initial reactions to a new intelligent operational planning and support tool (IOPST) for acute healthcare. The following reports on the first stage of a longitudinal project to use an innovative approach involving nurses in the development of the IOPST; from conceptualization to implementation.

  1. Operational Planning of Low-Energy District Heating Systems Connected to Existing Buildings

    DEFF Research Database (Denmark)

    Tol, Hakan; Svendsen, Svend

    2012-01-01

    -energy houses in a traditional DH network, the aim in this paper was given to reduce the dimensions of the low-energy DH network as much as possible. Hence, the performance analyses of the inhouse radiator heating systems equipped in existing buildings were carried out for low temperatures of supply and return......This article focuses on low-energy District Heating (DH) systems operating in low-temperatures such as 55°C in terms of supply and 25°C in terms of return in connection with existing buildings. Since the heat loss from the network has a significant impact in case of supplying heat to low....... The response of the radiator heating systems at different levels of supply temperature was used to form the operational planning of the low-energy DH system, which determined the design parameters of the low-energy DH network in terms of overall mass flow requirement and the return temperature from...

  2. Operational plans for life science payloads - From experiment selection through postflight reporting

    Science.gov (United States)

    Mccollum, G. W.; Nelson, W. G.; Wells, G. W.

    1976-01-01

    Key features of operational plans developed in a study of the Space Shuttle era life science payloads program are presented. The data describes the overall acquisition, staging, and integration of payload elements, as well as program implementation methods and mission support requirements. Five configurations were selected as representative payloads: (a) carry-on laboratories - medical emphasis experiments, (b) mini-laboratories - medical/biology experiments, (c) seven-day dedicated laboratories - medical/biology experiments, (d) 30-day dedicated laboratories - Regenerative Life Support Evaluation (RLSE) with selected life science experiments, and (e) Biomedical Experiments Scientific Satellite (BESS) - extended duration primate (Type I) and small vertebrate (Type II) missions. The recommended operational methods described in the paper are compared to the fundamental data which has been developed in the life science Spacelab Mission Simulation (SMS) test series. Areas assessed include crew training, experiment development and integration, testing, data-dissemination, organization interfaces, and principal investigator working relationships.

  3. Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13

    Energy Technology Data Exchange (ETDEWEB)

    Richard P. Wells

    2007-03-23

    This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year.

  4. Operational plans for life science payloads - From experiment selection through postflight reporting

    Science.gov (United States)

    Mccollum, G. W.; Nelson, W. G.; Wells, G. W.

    1976-01-01

    Key features of operational plans developed in a study of the Space Shuttle era life science payloads program are presented. The data describes the overall acquisition, staging, and integration of payload elements, as well as program implementation methods and mission support requirements. Five configurations were selected as representative payloads: (a) carry-on laboratories - medical emphasis experiments, (b) mini-laboratories - medical/biology experiments, (c) seven-day dedicated laboratories - medical/biology experiments, (d) 30-day dedicated laboratories - Regenerative Life Support Evaluation (RLSE) with selected life science experiments, and (e) Biomedical Experiments Scientific Satellite (BESS) - extended duration primate (Type I) and small vertebrate (Type II) missions. The recommended operational methods described in the paper are compared to the fundamental data which has been developed in the life science Spacelab Mission Simulation (SMS) test series. Areas assessed include crew training, experiment development and integration, testing, data-dissemination, organization interfaces, and principal investigator working relationships.

  5. Is science the driving force in the operation of environmental regimes? : a case study of the Mediterranean Action Plan

    NARCIS (Netherlands)

    Frantzi, Sofia; Lovett, Jon C.

    2008-01-01

    This study examines the role of science in the operation of environmental regimes using the Barcelona Convention/Mediterranean Action Plan (MAP) as a case study. The ‘epistemic communities’ theory suggests that emergence of the Mediterranean Action Plan was largely driven by scientific experts. In o

  6. Development of BIM Execution Plan for BIM Model Management during the Pre-Operation Phase: A Case Study

    Directory of Open Access Journals (Sweden)

    Yu-Cheng Lin

    2016-02-01

    Full Text Available Building information modeling (BIM technologies use precise geometry and relevant data to enhance and improve the maintenance performance of facilities integrated with 3D object-oriented computer aided design (CAD. Although most owners agree on the potential benefits of integrating BIM technologies with facility management (FM, they must overcome many problems to plan and develop effective BIM execution plans for FM implementation. This study proposes and develops a BIM execution plan for BIM model management for FM during the pre-operation phase. Through the application of the proposed BIM execution plan, BIM can be effectively implemented during the operation and maintenance phases. In order to verify the proposed methodology and demonstrate its effectiveness in practice, the BIM execution plan is then applied in a selected case study of a building project in Taiwan. The combined results demonstrate that the proposed BIM execution plan is an effective approach for operation and maintenance management. The advantage of the proposed BIM execution plan lies not only in improving the efficiency of maintenance management work when integrated with BIM technologies, but also in maximizing the value and benefits of BIM to support maintenance management. Finally, limitations, difficulties, and suggestions are summarized for further development of the BIM execution plan for BIM model management during the pre-operation phase.

  7. NASA Planning for Orion Multi-Purpose Crew Vehicle Ground Operations

    Science.gov (United States)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    The NASA Orion Ground Processing Team was originally formed by the Kennedy Space Center (KSC) Constellation (Cx) Project Office's Orion Division to define, refine and mature pre-launch and post-landing ground operations for the Orion human spacecraft. The multidisciplined KSC Orion team consisted of KSC civil servant, SAIC, Productivity Apex, Inc. and Boeing-CAPPS engineers, project managers and safety engineers, as well as engineers from Constellation's Orion Project and Lockheed Martin Orion Prime contractor. The team evaluated the Orion design configurations as the spacecraft concept matured between Systems Design Review (SDR), Systems Requirement Review (SRR) and Preliminary Design Review (PDR). The team functionally decomposed prelaunch and post-landing steps at three levels' of detail, or tiers, beginning with functional flow block diagrams (FFBDs). The third tier FFBDs were used to build logic networks and nominal timelines. Orion ground support equipment (GSE) was identified and mapped to each step. This information was subsequently used in developing lower level operations steps in a Ground Operations Planning Document PDR product. Subject matter experts for each spacecraft and GSE subsystem were used to define 5th - 95th percentile processing times for each FFBD step, using the Delphi Method. Discrete event simulations used this information and the logic network to provide processing timeline confidence intervals for launch rate assessments. The team also used the capabilities of the KSC Visualization Lab, the FFBDs and knowledge of the spacecraft, GSE and facilities to build visualizations of Orion pre-launch and postlanding processing at KSC. Visualizations were a powerful tool for communicating planned operations within the KSC community (i.e., Ground Systems design team), and externally to the Orion Project, Lockheed Martin spacecraft designers and other Constellation Program stakeholders during the SRR to PDR timeframe. Other operations planning

  8. Using GOMS and Bayesian plan recognition to develop recognition models of operator behavior

    Science.gov (United States)

    Zaientz, Jack D.; DeKoven, Elyon; Piegdon, Nicholas; Wood, Scott D.; Huber, Marcus J.

    2006-05-01

    Trends in combat technology research point to an increasing role for uninhabited vehicles in modern warfare tactics. To support increased span of control over these vehicles human responsibilities need to be transformed from tedious, error-prone and cognition intensive operations into tasks that are more supervisory and manageable, even under intensely stressful conditions. The goal is to move away from only supporting human command of low-level system functions to intention-level human-system dialogue about the operator's tasks and situation. A critical element of this process is developing the means to identify when human operators need automated assistance and to identify what assistance they need. Toward this goal, we are developing an unmanned vehicle operator task recognition system that combines work in human behavior modeling and Bayesian plan recognition. Traditionally, human behavior models have been considered generative, meaning they describe all possible valid behaviors. Basing behavior recognition on models designed for behavior generation can offers advantages in improved model fidelity and reuse. It is not clear, however, how to reconcile the structural differences between behavior recognition and behavior modeling approaches. Our current work demonstrates that by pairing a cognitive psychology derived human behavior modeling approach, GOMS, with a Bayesian plan recognition engine, ASPRN, we can translate a behavior generation model into a recognition model. We will discuss the implications for using human performance models in this manner as well as suggest how this kind of modeling may be used to support the real-time control of multiple, uninhabited battlefield vehicles and other semi-autonomous systems.

  9. Performance of Optimization Heuristics for the Operational Planning of Multi-energy Storage Systems

    Science.gov (United States)

    Haas, J.; Schradi, J.; Nowak, W.

    2016-12-01

    In the transition to low-carbon energy sources, energy storage systems (ESS) will play an increasingly important role. Particularly in the context of solar power challenges (variability, uncertainty), ESS can provide valuable services: energy shifting, ramping, robustness against forecast errors, frequency support, etc. However, these qualities are rarely modelled in the operational planning of power systems because of the involved computational burden, especially when multiple ESS technologies are involved. This work assesses two optimization heuristics for speeding up the optimal operation problem. It compares their accuracy (in terms of costs) and speed against a reference solution. The first heuristic (H1) is based on a merit order. Here, the ESS are sorted from lower to higher operational costs (including cycling costs). For each time step, the cheapest available ESS is used first, followed by the second one and so on, until matching the net load (demand minus available renewable generation). The second heuristic (H2) uses the Fourier transform to detect the main frequencies that compose the net load. A specific ESS is assigned to each frequency range, aiming to smoothen the net load. Finally, the reference solution is obtained with a mixed integer linear program (MILP). H1, H2 and MILP are subject to technical constraints (energy/power balance, ramping rates, on/off states...). Costs due to operation, replacement (cycling) and unserved energy are considered. Four typical days of a system with a high share of solar energy were used in several test cases, varying the resolution from one second to fifteen minutes. H1 and H2 achieve accuracies of about 90% and 95% in average, and speed-up times of two to three and one to two orders of magnitude, respectively. The use of the heuristics looks promising in the context of planning the expansion of power systems, especially when their loss of accuracy is outweighed by solar or wind forecast errors.

  10. Department of Energy’s ARM Climate Research Facility External Data Center Operations Plan Located At Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Cialella, A. [Brookhaven National Lab. (BNL), Upton, NY (United States); Gregory, L. [Brookhaven National Lab. (BNL), Upton, NY (United States); Lazar, K. [Brookhaven National Lab. (BNL), Upton, NY (United States); Liang, M. [Brookhaven National Lab. (BNL), Upton, NY (United States); Ma, L. [Brookhaven National Lab. (BNL), Upton, NY (United States); Tilp, A. [Brookhaven National Lab. (BNL), Upton, NY (United States); Wagener, R. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2015-05-01

    The External Data Center (XDC) Operations Plan describes the activities performed to manage the XDC, located at Brookhaven National Laboratory (BNL), for the Department of Energy’s Atmospheric Radiation Measurement (ARM) Climate Research Facility. It includes all ARM infrastructure activities performed by the Data Management and Software Engineering Group (DMSE) at BNL. This plan establishes a baseline of expectation within the ARM Operations Management for the group managing the XDC.

  11. Research and technology operating plan summary: Fiscal year 1975 research and technology program. [space programs, energy technology, and aerospace sciences

    Science.gov (United States)

    1975-01-01

    Summaries are presented of Research and Technology Operating Plans currently in progress throughout NASA. Citations and abstracts of the operating plans are presented along with a subject index, technical monitor index, and responsible NASA organization index. Research programs presented include those carried out in the Office of Aeronautics and Space Technology, Office of Energy Programs, Office of Applications, Office of Space Sciences, Office of Tracking and Data Acquisition, and the Office of Manned Space Flight.

  12. Operation planning of electrical power systems; Planeacion de operacion de sistemas electricos de potencia

    Energy Technology Data Exchange (ETDEWEB)

    Rivas, Elena [ed.] [Instituto de Investigaciones Electricas, Temixco, Morelos (Mexico)

    1999-07-01

    The development of a software that has facilitated and improved considerably the planning tasks, besides diminishing the production costs is presented. The software denominated Hydrothermal Coordination (HTC)(Coordinacion Hidrotermica (CHT)), was developed in the Instituto de Investigaciones Electricas (IIE), with this software the plan of short term operation of the generating units is determined. The software analyzes mathematically a great number of options regarding to the allocation of generation units and selects very close solutions, in cost, to the optimal one. It constitutes in addition an information system that stores the relevant data of each unit, useful for decision making. [Spanish] Se presenta el desarrollo de un software que ha facilitado y mejorado considerablemente las tareas de planeacion, ademas de disminuir los costos de produccion. El paquete denominado Coordinacion Hidrotermica (CHT), fue desarrollado en el Instituto de Investigaciones Electricas (IIE); con el se determina el plan de operacion a corto plazo de las unidades generadoras. El paquete analiza matematicamente un gran numero de opciones en lo que se refiere a la asignacion de unidades de generacion y selecciona soluciones muy cercanas, en costo, a la optima. Constituye ademas un sistema de informacion que almacena los datos relevantes de cada unidad, utiles para la toma de decisiones.

  13. Task Allocation and Path Planning for Collaborative Autonomous Underwater Vehicles Operating through an Underwater Acoustic Network

    Directory of Open Access Journals (Sweden)

    Yueyue Deng

    2013-01-01

    Full Text Available Dynamic and unstructured multiple cooperative autonomous underwater vehicle (AUV missions are highly complex operations, and task allocation and path planning are made significantly more challenging under realistic underwater acoustic communication constraints. This paper presents a solution for the task allocation and path planning for multiple AUVs under marginal acoustic communication conditions: a location-aided task allocation framework (LAAF algorithm for multitarget task assignment and the grid-based multiobjective optimal programming (GMOOP mathematical model for finding an optimal vehicle command decision given a set of objectives and constraints. Both the LAAF and GMOOP algorithms are well suited in poor acoustic network condition and dynamic environment. Our research is based on an existing mobile ad hoc network underwater acoustic simulator and blind flooding routing protocol. Simulation results demonstrate that the location-aided auction strategy performs significantly better than the well-accepted auction algorithm developed by Bertsekas in terms of task-allocation time and network bandwidth consumption. We also demonstrate that the GMOOP path-planning technique provides an efficient method for executing multiobjective tasks by cooperative agents with limited communication capabilities. This is in contrast to existing multiobjective action selection methods that are limited to networks where constant, reliable communication is assumed to be available.

  14. Employing Multiple Unmanned Aerial Vehicles for Co-Operative Path Planning

    Directory of Open Access Journals (Sweden)

    Durdana Habib

    2013-05-01

    Full Text Available In this paper, we work to develop a path planning solution for a group of Unmanned Aerial Vehicles (UAVs using a Mixed Integer Linear Programming (MILP approach. Co‐operation among team members not only helps reduce mission time, it makes the execution more robust in dynamic environments. However, the problem becomes more challenging as it requires optimal resource allocation and is NP‐hard. Since UAVs may be lost or may suffer significant damage during the course of the mission, plans may need to be modified in real‐time as the mission proceeds. Therefore, multiple UAVs have a better chance of completing a mission in the face of failures. Such military operations can be treated as a variant of the Multiple Depot Vehicle Routing Problem (MDVRP. The proposed solution must be such that m UAVs start from multiple source locations to visit n targets and return to a set of destination locations such that (1 each target is visited exactly by one of the chosen UAVs (2 the total distance travelled by the group is minimized and (3 the number of targets that each UAV visits may not be less than K or greater than L.

  15. Use of the Homeland-Defense Operational Planning System (HOPS) for Emergency Management

    Energy Technology Data Exchange (ETDEWEB)

    Durling, Jr., R L; Price, D E

    2005-12-16

    The Homeland-Defense Operational Planning System (HOPS), is a new operational planning tool leveraging Lawrence Livermore National Laboratory's expertise in weapons systems and in sparse information analysis to support the defense of the U.S. homeland. HOPS provides planners with a basis to make decisions to protect against acts of terrorism, focusing on the defense of facilities critical to U.S. infrastructure. Criticality of facilities, structures, and systems is evaluated on a composite matrix of specific projected casualty, economic, and sociopolitical impact bins. Based on these criteria, significant unidentified vulnerabilities are identified and secured. To provide insight into potential successes by malevolent actors, HOPS analysts strive to base their efforts mainly on unclassified open-source data. However, more cooperation is needed between HOPS analysts and facility representatives to provide an advantage to those whose task is to defend these facilities. Evaluated facilities include: refineries, major ports, nuclear power plants and other nuclear licensees, dams, government installations, convention centers, sports stadiums, tourist venues, and public and freight transportation systems. A generalized summary of analyses of U.S. infrastructure facilities will be presented.

  16. Risk Assessment Using The Homeland-Defense Operational Planning System (HOPS)

    Energy Technology Data Exchange (ETDEWEB)

    Price, D E; Durling, R L

    2005-10-10

    The Homeland-Defense Operational Planning System (HOPS), is a new operational planning tool leveraging Lawrence Livermore National Laboratory's expertise in weapons systems and in sparse information analysis to support the defense of the U.S. homeland. HOPS provides planners with a basis to make decisions to protect against acts of terrorism, focusing on the defense of facilities critical to U.S. infrastructure. Criticality of facilities, structures, and systems is evaluated on a composite matrix of specific projected casualty, economic, and sociopolitical impact bins. Based on these criteria, significant unidentified vulnerabilities are identified and secured. To provide insight into potential successes by malevolent actors, HOPS analysts strive to base their efforts mainly on unclassified open-source data. However, more cooperation is needed between HOPS analysts and facility representatives to provide an advantage to those whose task is to defend these facilities. Evaluated facilities include: refineries, major ports, nuclear power plants and other nuclear licensees, dams, government installations, convention centers, sports stadiums, tourist venues, and public and freight transportation systems. A generalized summary of analyses of U.S. infrastructure facilities will be presented.

  17. HEMP emergency planning and operating procedures for electric power systems. Power Systems Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. [Electrotek Concepts, Inc., Knoxville, TN (United States)

    1991-12-31

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E{sub 1} (steep-front pulse) component and the late time E{sub 3} (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council`s regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  18. Operational Readiness Review Plan for the Radioisotope Thermoelectric Generator Materials Production Tasks

    Science.gov (United States)

    Cooper, R. H.; Martin, M. M.; Riggs, C. R.; Beatty, R. L.; Ohriner, E. K.; Escher, R. N.

    1990-04-19

    In October 1989, a US shuttle lifted off from Cape Kennedy carrying the spacecraft Galileo on its mission to Jupiter. In November 1990, a second spacecraft, Ulysses, will be launched from Cape Kennedy with a mission to study the polar regions of the sun. The prime source of power for both spacecraft is a series of radioisotope thermoelectric generators (RTGs), which use plutonium oxide (plutonia) as a heat source. Several of the key components in this power system are required to ensure the safety of both the public and the environment and were manufactured at Oak Ridge National Laboratory (ORNL) in the 1980 to 1983 period. For these two missions, Martin Marietta Energy Systems, Inc. (Energy Systems), will provide an iridium alloy component used to contain the plutonia heat source and a carbon composite material that serves as a thermal insulator. ORNL alone will continue to fabricate the carbon composite material. Because of the importance to DOE that Energy Systems deliver these high quality components on time, performance of an Operational Readiness Review (ORR) of these manufacturing activities is necessary. Energy Systems Policy GP 24 entitled "Operational Readiness Process" describes the formal and comprehensive process by which appropriate Energy Systems activities are to be reviewed to ensure their readiness. This Energy System policy is aimed at reducing the risks associated with mission success and requires a management approved "readiness plan" to be issued. This document is the readiness plan for the RTG materials production tasks.

  19. A modularized framework for sales and operations planning with focus on process industries

    Directory of Open Access Journals (Sweden)

    Sayeh Noroozi

    2016-01-01

    Full Text Available This paper suggests a modularized sales and operations planning (S&OP framework, consisting of content and process. The framework’s content is based on a typology of decoupling points in which the effect of decoupling points on the decision variables in S&OP is studied. The framework’s process takes a step back and addresses the need for a more elaborate design to precede the operational use of S&OP content for different production contexts. The framework supports both process industries (PIs and discrete manufacturing industries (DIs, and recognizes their specific requirements and reflects them in their S&OP. The differentiating characteristics of PIs and DIs are emphasized through three different decoupling points, namely: discretization decoupling point, control mode decoupling point, and customer order decoupling point. The suggested framework aims to fill the gap in the literature regarding the lack of aggregate planning processes that match the PIs’ specific requirements by reflecting the differentiating characteristics of PIs in S&OP.

  20. Remedial design work plan for Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    The Remedial Design Work Plan (RDWP) for Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee. This remedial action fits into the overall Oak Ridge Reservation (ORR) cleanup strategy by addressing contaminated floodplain soil. The objective of this remedial action is to minimize the risk to human health and the environment from contaminated soil in the Lower EFPC floodplain pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Federal Facility Agreement (FFA) (1992). In accordance with the FFA, a remedial investigation (RI) (DOE 1994a) and a feasibility study (DOE 1994b) were conducted to assess contamination of the Lower EFPC and propose remediation alternatives. The remedial investigation determined that the principal contaminant is mercury, which originated from releases during Y-12 Plant operations, primarily between 1953 and 1963. The recommended alternative by the feasibility study was to excavate and dispose of floodplain soils contaminated with mercury above the remedial goal option. Following the remedial investigation/feasibility study, and also in accordance with the FFA, a proposed plan was prepared to more fully describe the proposed remedy.

  1. HEMP emergency planning and operating procedures for electric power systems. Power Systems Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. [Electrotek Concepts, Inc., Knoxville, TN (United States)

    1991-12-31

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E{sub 1} (steep-front pulse) component and the late time E{sub 3} (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council`s regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  2. Macro-FF: Improving AI Planning with Automatically Learned Macro-Operators

    CERN Document Server

    Botea, A; Mueller, M; Schaeffer, J; 10.1613/jair.1696

    2011-01-01

    Despite recent progress in AI planning, many benchmarks remain challenging for current planners. In many domains, the performance of a planner can greatly be improved by discovering and exploiting information about the domain structure that is not explicitly encoded in the initial PDDL formulation. In this paper we present and compare two automated methods that learn relevant information from previous experience in a domain and use it to solve new problem instances. Our methods share a common four-step strategy. First, a domain is analyzed and structural information is extracted, then macro-operators are generated based on the previously discovered structure. A filtering and ranking procedure selects the most useful macro-operators. Finally, the selected macros are used to speed up future searches. We have successfully used such an approach in the fourth international planning competition IPC-4. Our system, Macro-FF, extends Hoffmanns state-of-the-art planner FF 2.3 with support for two kinds of macro-operato...

  3. Ptolemy operations at the surface of a comet, from planning to reality

    Science.gov (United States)

    Morse, A. D.; Andrews, D. J.; Morgan, G. H.; Sheridan, S.; Barber, S. J.; Wright, I. P.

    2016-08-01

    Ptolemy is a Gas Chromatograph-Isotope Ratio-Mass Spectrometer (GC-IR-MS) aboard the Philae lander element of the Rosetta mission to comet 67P/Churyumov-Gerasimenko. Developed to determine the chemical and stable light isotopic composition of cometary material, Ptolemy was conceived as a highly flexible instrument able to accommodate changes in operational functionality via software modification. This was considered essential to allow for different modes of operation not only in response to rapid/unexpected changes and opportunities, but also to longer-term shifts in priorities as the overall mission plan (and indeed cometary science in general) changed during the decades from initial concept to landing. Against the backdrop of events of the Philae landing, this paper describes the methods of instrument operation and rational behind them used to achieve the Ptolemy scientific results during the period 12-14th November 2014. In particular we demonstrate the importance of a flexible modular approach to the instrument architecture enabling complex instrument operations, especially in a situation where the environment of exploration is effectively unknown and some of the engineering solutions were being tested in the field for the first time.

  4. The SAFE strategy for trachoma control: Using operational research for policy, planning and implementation.

    Science.gov (United States)

    Emerson, Paul M; Burton, Matthew; Solomon, Anthony W; Bailey, Robin; Mabey, David

    2006-08-01

    Trachoma is a neglected disease and also the world's leading infectious cause of blindness. It causes misery, dependency and is a barrier to development. Trachoma is controlled by a WHO-endorsed integrated strategy of surgery for trichiasis, antibiotic therapy, facial cleanliness and environmental improvement, which is known by the acronym SAFE. The strategy is based on evidence from field trials and is continually being refined by operational research that informs national policy and planning; the strategy has affected both programme delivery and implementation. As a result of the findings of operational research, surgery is now frequently conducted by paramedics in communities rather than by ophthalmologists in hospitals; yearly mass distribution of a single oral dose of azithromycin has replaced the use of topical tetracycline; and the promotion of better hygiene, face-washing and the use of latrines are used to reduce transmission. Those who implement programmes have been equal partners in conducting operational research thus reducing the "know-do" gap and minimizing the lag that often exists between the completion of trials and putting their results into practice. Operational research has become a part of practice. Although there are still many questions without answers, national programme coordinators have a reasonable expectation that trachoma control programmes based on SAFE will work.

  5. Assessing interdependent operational, tactical and strategic risks for improved utility master plans.

    Science.gov (United States)

    Luís, Ana; Lickorish, Fiona; Pollard, Simon

    2015-05-01

    Risk management plays a key role in water utilities. Although risk tools are well-established at operational levels, approaches at the strategic level are rarely informed by systemic assessments of the water supply and lack a long-term perspective. Here, we report a baseline strategic risk analysis, founded on a systemic analysis of operational risks developed 'bottom-up' and validated in a large water utility. Deploying an action-oriented research method, supported by semi- structured interviews with in-house water utility risk experts, deep connections are established between operational risk and strategic risk that surpass those existing elsewhere in the sector. Accessible presentational formats - influence diagrams, risk "heat-maps" and supporting narratives are used to promote Board-level risk discussions, and characterise a baseline set of strategic risks core to forward utility master planning. Uniquely, the influence of operational events, exposures and potential harms, together with the mitigating measures in place to mediate these risks are linked to corporate objectives on business sustainability, profitability, water quality, water quantity, supply disruption and reputation. Copyright © 2015 Elsevier Ltd. All rights reserved.

  6. Planning for avian flu disruptions on global operations: a DMAIC case study.

    Science.gov (United States)

    Kumar, Sameer

    2012-01-01

    The author aims to assess the spread of avian flu, its impact on businesses operating in the USA and overseas, and the measures required for corporate preparedness. Six Sigma DMAIC process is used to analyze avian flu's impact and how an epidemic could affect large US business operations worldwide. Wal-Mart and Dell Computers were chosen as one specializes in retail and the other manufacturing. The study identifies avian flu pandemic risks including failure modes on Wal-Mart and Dell Computers global operations. It reveals the factors that reinforce avian-flu pandemic's negative impact on company global supply chains. It also uncovers factors that balance avian-flu pandemic's impact on their global supply chains. Avian flu and its irregularity affect the research outcomes because its spread could fluctuate based on so many factors that could come into play. Further, the potential cost to manufacturers and other supply chain partners is relatively unknown. As a relatively new phenomenon, quantitative data were not available to determine immediate costs. In this decade, the avian influenza H5N1 virus has killed millions of poultry in Asia, Europe and Africa. This flu strain can infect and kill humans who come into contact with this virus. An avian influenza H5N1 outbreak could lead to a devastating effect on global food supply, business services and business operations. The study provides guidance on what global business operation managers can do to prepare for such events, as well as how avian flu progression to a pandemic can disrupt such operations. This study raises awareness about avian flu's impact on businesses and humans and also highlights the need to create contingency plans for corporate preparedness to avoid incurring losses.

  7. Optimization of operational planning for wind/hydro hybrid water supply systems

    Energy Technology Data Exchange (ETDEWEB)

    Vieira, Filipe; Ramos, Helena M. [Department of Civil Engineering, Instituto Superior Tecnico, Av. Rovisco Pais 1, 1049-001 Lisboa (Portugal)

    2009-03-15

    Water supply systems (WSS) frequently present high-energy consumption values, which correspond to the major expenses of these systems. Energy costs are a function of its real consumption and of the variability of the daily energy tariff. This paper presents a model of optimization for the energy efficiency in a water supply system. The system is equipped with a pump station and presents excess of available energy in the gravity branch. First, a water turbine is introduced in the system in order to use this excess of hydraulic available energy. Then, an optimization method to define the pump operation planning along the 24 h of simulation, as well as the analysis of the economic benefits resulting from the profit of wind energy to supply the water pumping, while satisfying the system constraints and population demands, is implemented, in order to minimize the global operational costs. The model, developed in MATLAB, uses linear programming and provides the planning strategy to take in each time step, which will influence the following hours. The simulation period considered is one day, sub-divided in hourly time steps. The rules obtained as output of the optimization procedures are subsequently introduced in a hydraulic simulator (e.g. EPANET), in order to verify the system behaviour along the simulation period. The results are compared with the normal operating mode (i.e. without optimization algorithm) and show that energy cost's savings are achieved dependently of the initial reservoir levels or volume. The insertion of the water turbine also generates significant economical benefits for the water supply system. (author)

  8. Operations research for resource planning and -use in radiotherapy: a literature review.

    Science.gov (United States)

    Vieira, Bruno; Hans, Erwin W; van Vliet-Vroegindeweij, Corine; van de Kamer, Jeroen; van Harten, Wim

    2016-11-25

    The delivery of radiotherapy (RT) involves the use of rather expensive resources and multi-disciplinary staff. As the number of cancer patients receiving RT increases, timely delivery becomes increasingly difficult due to the complexities related to, among others, variable patient inflow, complex patient routing, and the joint planning of multiple resources. Operations research (OR) methods have been successfully applied to solve many logistics problems through the development of advanced analytical models for improved decision making. This paper presents the state of the art in the application of OR methods for logistics optimization in RT, at various managerial levels. A literature search was performed in six databases covering several disciplines, from the medical to the technical field. Papers included in the review were published in peer-reviewed journals from 2000 to 2015. Data extraction includes the subject of research, the OR methods used in the study, the extent of implementation according to a six-stage model and the (potential) impact of the results in practice. From the 33 papers included in the review, 18 addressed problems related to patient scheduling (of which 12 focus on scheduling patients on linear accelerators), 8 focus on strategic decision making, 5 on resource capacity planning, and 2 on patient prioritization. Although calculating promising results, none of the papers reported a full implementation of the model with at least a thorough pre-post performance evaluation, indicating that, apart from possible reporting bias, implementation rates of OR models in RT are probably low. The literature on OR applications in RT covers a wide range of approaches from strategic capacity management to operational scheduling levels, and shows that considerable benefits in terms of both waiting times and resource utilization are likely to be achieved. Various fields can be further developed, for instance optimizing the coordination between the available

  9. DETERMINING TACTICAL OPERATIONAL PLANNING POLICIES FOR AN AUTO CARRIER – A CASE STUDY

    Directory of Open Access Journals (Sweden)

    A.J. Du Plessis

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: This study was done to assist a local auto carrier company with tactical operational planning. The objective of the planning process is to maximise the number of vehicles delivered while being on time and adhering to staff and maintenance schedule constraints.

    We investigated the feasibility of allowing part of the fleet to roam the closed spatial network, as opposed to the traditional assignment of the complete fleet to fixed routes. We developed decision-making rules for roaming and fixed-to-route auto carriers, and evaluated the quality of these proposed rules, in combination with different fleet compositions, using discrete event simulation and four performance measures.

    We found that the auto carrier company should adopt a tactical operations policy where at least 50% of the fleet is allowed to roam, while roaming auto carriers pick vehicles to transport according to specific rules.

    AFRIKAANSE OPSOMMING: Hierdie studie is gedoen om ’n plaaslike motorvervoer-onderneming te help met taktiese bedryfsbeplanning. Die doelwit van die beplanningsproses is om die aantal voertuie wat betyds afgelewer word te maksimeer met inagneming van personeel- en instandhoudingbeperkings. Ons het die moontlikheid dat ’n deel van die vragmotorvloot swerwend in die geslote ruimtelike roete-network moet opereer, ondersoek. Dit is in teenstelling met die tradisionele vaste toedeling van vragmotors aan roetes. Besluitnemingreëls vir swerwende en vaste-roete vragmotors is ontwikkel, en die gehalte van die reëls is met diskrete simulasie en vier prestasiemaatstawwe evalueer.

    Ons het bevind dat die vervoeronderneming ’n bedryfsbeleid behoort te aanvaar wat toelaat dat ten minste 50% van die vloot swerf, terwyl hierdie swerwende vragmotors voertuie volgens spesifieke reëls by oplaaipunte moet kies.

  10. 30 CFR 905.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Underground mining permit applications-Minimum... OPERATIONS WITHIN EACH STATE CALIFORNIA § 905.784 Underground mining permit applications—Minimum requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications...

  11. 30 CFR 933.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Underground mining permit applications-minimum... OPERATIONS WITHIN EACH STATE NORTH CAROLINA § 933.784 Underground mining permit applications—minimum requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit...

  12. 30 CFR 939.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Underground mining permit applications-minimum... OPERATIONS WITHIN EACH STATE RHODE ISLAND § 939.784 Underground mining permit applications—minimum requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit...

  13. 30 CFR 921.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Underground mining permit applications-minimum... OPERATIONS WITHIN EACH STATE MASSACHUSETTS § 921.784 Underground mining permit applications—minimum requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit...

  14. 30 CFR 922.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Underground mining permit applications-minimum... OPERATIONS WITHIN EACH STATE MICHIGAN § 922.784 Underground mining permit applications—minimum requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications...

  15. 30 CFR 903.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Underground mining permit applications-Minimum... OPERATIONS WITHIN EACH STATE ARIZONA § 903.784 Underground mining permit applications—Minimum requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications...

  16. 30 CFR 912.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Underground mining permit applications-minimum... OPERATIONS WITHIN EACH STATE IDAHO § 912.784 Underground mining permit applications—minimum requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum...

  17. 30 CFR 937.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Underground mining permit applications-minimum... OPERATIONS WITHIN EACH STATE OREGON § 937.784 Underground mining permit applications—minimum requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum...

  18. 30 CFR 910.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Underground mining permit applications-minimum... OPERATIONS WITHIN EACH STATE GEORGIA § 910.784 Underground mining permit applications—minimum requirements for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit...

  19. Operation planning studies for the integration of the 60 Hz Itaipu units in the Brazilian interconnected system

    Energy Technology Data Exchange (ETDEWEB)

    Chipp, H.J.; Oliveira, J.C.C. [ELETROBRAS, Rio de Janeiro, RJ (Brazil); Correa, L.R.A. [FURNAS, Rio de Janeiro, RJ (Brazil); Mendonca, W.C.; Marchi, R.D. [Itaipu Binacional, Foz do Iguacu, PR (Brazil); Botelho, M.J. [ELETROSUL, Curitiba, PR (Brazil)

    1987-12-31

    This paper describes the operation planning studies necessary to interconnect the first two 60 Hz generator units of the Itaipu power plant to the Brazilian interconnected system. The criteria, main problems identified and operative solutions encountered are presented in this paper. 10 refs., 4 figs., 5 tabs.

  20. Status, results and plans after 3 years of Tunka-Rex operation

    Energy Technology Data Exchange (ETDEWEB)

    Hiller, Roman [Karlsruher Institut fuer Technologie (Germany); Collaboration: Tunka-Rex-Collaboration

    2016-07-01

    The Tunka Radio Extension (Tunka-Rex) is a radio detector for air showers from cosmic rays around 10{sup 17} eV close to Lake Baikal in Russia. It currently consists of 44 antenna stations, distributed over 3 km{sup 2}, and will be extended by another 19 antenna stations this year. As most radio experiments, it is hosted by another air-showers detector, providing trigger and an independed reconstruction. This has been Tunka-133, an air-Cherenkov detector at the site, limited to operation during moonless nights. From winter 2015 on, Tunka-Rex also jointly operates with Tunka-Grande, a newly installed scintillator detector at the site, capable of 24 h operation. The goal of the first stage of Tunka-Rex was to develop methods for competitive air shower measurements and detemine the achievable precision for the most important air shower parameters, the energy and depth of the shower maximum. In the next stage, with the now available full duty cycle and powerful combination of radio and scintillator detector, the goal will be to contribute to measurements of the energy spectrum and mass composition of cosmic rays from 10{sup 17} eV to 10{sup 18} eV. Latest results and plans for Tunka-Rex are reported. This includes an energy reconstruction with a single antenna station and the comparison of the absolute energy scale via radio measurements.

  1. Operational performance and plans for the ECH system on DIII-D

    Science.gov (United States)

    Lohr, J.; Cengher, M.; Gorelov, Y. A.; Ponce, D.; Torrezan, A.; Ives, L.; Read, M.; Leviness, A.

    2016-10-01

    The ECH system on the DIII-D tokamak currently comprises 6 gyrotrons operating at 110 GHz and injecting 3.5 MW for administratively limited pulse lengths up to 5 sec. A 7th gyrotron generating 1.5 MW at 117.5 GHz is planned for installation late in 2016. Production of this tube was delayed due to issues related to reflected electrons resulting in internal arcs during initial testing. Performance reliability of the individual gyrotrons in the DIII-D complex has exceeded 90% for a wide variety of operational modes, including fast modulation and rapid poloidal sweeping of the rf beams using high speed dc motors and magnetic position encoders. Measures have been taken to reduce the risk of damage to launcher hardware and diagnostics from inadvertent operation of the tokamak at densities such that the right hand cutoff frequency is present in the plasma. The system has occasionally been used in non-fusion applications. The most recent of these has been testing a CVD diamond waveguide blocking window at the Brewster angle. Work supported by the US DOE under DE-FC02-04ER54698 and DE-AC02-09CH11466.

  2. Optimization of the Waterbus Operation Plan Considering Carbon Emissions: The Case of Zhoushan City

    Directory of Open Access Journals (Sweden)

    Juying Wang

    2015-08-01

    Full Text Available Recently, as more people are concerned with the issues around environment protection, research about how to reduce carbon emissions has drawn increasing attention. Encouraging public transportation is an effective measure to reduce carbon emissions. However, overland public transportation does less to lower carbon because of the gradually increasing pressure of the urban road traffic. Therefore, the waterbus along the coast becomes a new direction of the urban public transport development. In order to optimize the operation plan of the waterbus, a bi-level model considering carbon emissions is proposed in this paper. In the upper-level model, a multiple objective model is established, which considers both the interests of the passengers and the operator while considering the carbon emissions. The lower-level model is a traffic model split by using a Nested Logit model. A NSGA-II (Non-dominated Sorting Genetic Algorithm-II algorithm is proposed to solve the model. Finally, the city of Zhoushan is chosen as an example to prove the feasibility of the model and the algorithm. The result shows that the proposed model for waterbus operation optimization can efficiently reduce transportation carbon emissions and satisfy passenger demand at the same time.

  3. Consolidating strategic planning and operational frameworks for integrated vector management in Eritrea.

    Science.gov (United States)

    Chanda, Emmanuel; Ameneshewa, Birkinesh; Mihreteab, Selam; Berhane, Araia; Zehaie, Assefash; Ghebrat, Yohannes; Usman, Abdulmumini

    2015-12-02

    Contemporary malaria vector control relies on the use of insecticide-based, indoor residual spraying (IRS) and long-lasting insecticidal nets (LLINs). However, malaria-endemic countries, including Eritrea, have struggled to effectively deploy these tools due technical and operational challenges, including the selection of insecticide resistance in malaria vectors. This manuscript outlines the processes undertaken in consolidating strategic planning and operational frameworks for vector control to expedite malaria elimination in Eritrea. The effort to strengthen strategic frameworks for vector control in Eritrea was the 'case' for this study. The integrated vector management (IVM) strategy was developed in 2010 but was not well executed, resulting in a rise in malaria transmission, prompting a process to redefine and relaunch the IVM strategy with integration of other vector borne diseases (VBDs) as the focus. The information sources for this study included all available data and accessible archived documentary records on malaria vector control in Eritrea. Structured literature searches of published, peer-reviewed sources using online, scientific, bibliographic databases, Google Scholar, PubMed and WHO, and a combination of search terms were utilized to gather data. The literature was reviewed and adapted to the local context and translated into the consolidated strategic framework. In Eritrea, communities are grappling with the challenge of VBDs posing public health concerns, including malaria. The global fund financed the scale-up of IRS and LLIN programmes in 2014. Eritrea is transitioning towards malaria elimination and strategic frameworks for vector control have been consolidated by: developing an integrated vector management (IVM) strategy (2015-2019); updating IRS and larval source management (LSM) guidelines; developing training manuals for IRS and LSM; training of national staff in malaria entomology and vector control, including insecticide resistance

  4. Hungry Horse Mitigation Plan; Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam, 1990-2003 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fraley, John J.; Marotz, Brian L. (Montana Department of Fish, Wildlife and Parks, Helena, MT); DosSantos, Joseph M. (Confederated Salish and Kootenai Tribes of the Flathead Nation, Pablo, MT)

    2003-04-01

    In this document we present fisheries losses, mitigation alternatives, and recommendations to protect, mitigate, and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan addresses six separate program measures in the 1987 Columbia Basin Fish and Wildlife Program. We designed the plan to be closely coordinated in terms of dam operations, funding, and activities with the Kerr Mitigation Plan presently before the Federal Energy Regulatory Commission. This document represents a mitigation plan for consideration by the Northwest Power Planning Council process; it is not an implementation plan. Flathead Lake is one of the cleanest lakes of its size in the world. The exceptional water quality and unique native fisheries make the Flathead Lake/River system extremely valuable to the economy and quality of life in the basin. The recreational fishery in Flathead Lake has an estimated value of nearly eight million dollars annually. This mitigation process represents our best opportunity to reduce the impacts of hydropower in this valuable aquatic system and increase angling opportunity. We based loss estimates and mitigation alternatives on an extensive data base, agency reports, nationally and internationally peer-reviewed scientific articles, and an innovative biological model for Hungry Horse Reservoir and the Flathead River. We conducted an extensive, 14-month scoping and consultation process with agency representatives, representatives of citizen groups, and the general public. This consultation process helped identify issues, areas of agreement, areas of conflict, and advantages and disadvantages of mitigation alternatives. The results of the scoping and consultation process helped shape our mitigation plan. Our recommended plan is based firmly on principles of adaptive management and recognition of biological uncertainty. After we receive direction from the NPPC, we will add more detailed hypotheses and

  5. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  6. STORMVEX: The Storm Peak Lab Cloud Property Validation Experiment Science and Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Mace, J; Matrosov, S; Shupe, M; Lawson, P; Hallar, G; McCubbin, I; Marchand, R; Orr, B; Coulter, R; Sedlacek, A; Avallone, L; Long, C

    2010-09-29

    During the Storm Peak Lab Cloud Property Validation Experiment (STORMVEX), a substantial correlative data set of remote sensing observations and direct in situ measurements from fixed and airborne platforms will be created in a winter season, mountainous environment. This will be accomplished by combining mountaintop observations at Storm Peak Laboratory and the airborne National Science Foundation-supported Colorado Airborne Multi-Phase Cloud Study campaign with collocated measurements from the second ARM Mobile Facility (AMF2). We describe in this document the operational plans and motivating science for this experiment, which includes deployment of AMF2 to Steamboat Springs, Colorado. The intensive STORMVEX field phase will begin nominally on 1 November 2010 and extend to approximately early April 2011.

  7. Reliability analysis and risk-based methods for planning of operation & maintenance of offshore wind turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2017-01-01

    for extreme and fatigue limit states are presented. Operation & Maintenance planning often follows corrective and preventive strategies based on information from condition monitoring and structural health monitoring systems. A reliability- and riskbased approach is presented where a life-cycle approach......Reliability analysis and probabilistic models for wind turbines are considered with special focus on structural components and application for reliability-based calibration of partial safety factors. The main design load cases to be considered in design of wind turbine components are presented...... including the effects of the control system and possible faults due to failure of electrical / mechanical components. Considerations are presented on the target reliability level for wind turbine structural components. Application is shown for reliability-based calibrations of partial safety factors...

  8. Risk-Based Operation and Maintenance Planning for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2010-01-01

    Operation and maintenance (O&M) are large contributors to the cost of energy for offshore wind turbines. Optimal planning of O&M should include use of inspections and monitoring results to make decisions that minimize the expected costs through the lifetime of the structures. For offshore...... structures it is especially important because of the dependence on weather windows for inspections and repairs to be possible. A model has been developed to estimate the expected costs to corrective and condition based maintenance for a wind turbine with a single component. The deterioration of the component...... is simulated, and the expected costs are found for different strategies. An application example shows that condition based maintenance has the potential of reducing the costs, and a risk based approach can be used to find the optimal strategy for O&M. Further the influence of failure rate and damage parameters...

  9. Improving productivity and profitability of a bioanalytical business through sales and operation planning.

    Science.gov (United States)

    Islam, Rafiqul

    2013-07-01

    Today's bioanalytical CROs face increasing global competition, highly variable demand, high fixed costs, pricing pressure, and increasing demand for quality and speed. Most bioanalytical laboratories have responded to these challenges by implementing automation and by implementing process improvement methodologies (e.g., Six Sigma). These solutions have not resulted in a significant improvement in productivity and profitability since none of them are able to predict the upturn or downturn in demand. High volatility of demand causes long lead times and high costs during peak demand and poor productivity during trough demand. Most bioanalytical laboratories lack the tools to align supply efficiently to meet changing demand. In this paper, sales and operation planning (S&OP) has been investigated as a tool to balance supply and demand. The S&OP process, when executed effectively, can be the single greatest determinant of profitability for a bioanalytical business.

  10. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  11. Project Management Plan/Progress Report UT/GTKS Training Program Development for Commercial Building Operators

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2013-03-31

    Universidad del Turabo (UT), in a collaborative effort with Global Turn Key Services, Inc. (GTKS), proposed to develop a training program and a commercialization plan for the development of Commercial Building Operators (CBOs). The CBOs will operate energy efficient buildings to help maintain existing buildings up to their optimal energy performance level, and ensure that net-zero-energy buildings continuously operate at design specifications, thus helping achieve progress towards meeting BTP Strategic Goals of creating technologies and design approaches that enable net-zero-energy buildings at low incremental costs by 2025. The proposed objectives were then: (1) Develop a Commercial Building Operator (CBO) training program and accreditation that will in turn provide a certification to participants recognized by Accreditation Boards such as the North American Board of Certified Energy Practitioners (NABCEP) and Leadership in Energy & Environmental Designs (LEED). (2) Develop and implement a commercialization and sustainability plan that details marketing, deployment, financial characterization, job placement, and other goals required for long-term sustainability of the project after the funding period. (3) After program development and deployment, provide potential candidates with the knowledge and skill sets to obtain employment in the commercial building green energy (net-zero-energy building) job market. The developed CBO training program will focus on providing skills for participants, such as displaced and unemployed workers, to enter the commercial building green energy (net-zeroenergy building) job market. This course was designed to allow a participant with minimal to no experience in commercial building green technology to obtain the required skill sets to enter the job market in as little as 12 weeks of intensive multi-faceted learning. After completion of the course, the CBO staff concluded the participant will meet minimum established accreditation

  12. Operational readiness review plan for the radioisotope thermoelectric generator materials production tasks

    Energy Technology Data Exchange (ETDEWEB)

    Cooper, R.H.; Martin, M.M.; Riggs, C.R.; Beatty, R.L.; Ohriner, E.K.; Escher, R.N.

    1990-04-19

    In October 1989, a US shuttle lifted off from Cape Kennedy carrying the spacecraft Galileo on its mission to Jupiter. In November 1990, a second spacecraft, Ulysses, will be launched from Cape Kennedy with a mission to study the polar regions of the sun. The prime source of power for both spacecraft is a series of radioisotope thermoelectric generators (RTGs), which use plutonium oxide (plutonia) as a heat source. Several of the key components in this power system are required to ensure the safety of both the public and the environment and were manufactured at Oak Ridge National Laboratory (ORNL) in the 1980 to 1983 period. For these two missions, Martin Marietta Energy Systems, Inc. (Energy Systems), will provide an iridium-alloy component used to contain the plutonia heat source and a carbon-composite material that serves as a thermal insulator. ORNL alone will continue to fabricate the carbon-composite material. Because of the importance to DOE that Energy Systems deliver these high-quality components on time, performance of an Operational Readiness Review (ORR) of these manufacturing activities is necessary. Energy Systems Policy GP-24 entitled Operational Readiness Process'' describes the formal and comprehensive process by which appropriate Energy Systems activities are to be reviewed to ensure their readiness. This Energy System policy is aimed at reducing the risks associated with mission success and requires a management-approved readiness plan'' to be issued. This document is the readiness plan for the RTG materials production tasks. 6 refs., 11 figs., 1 tab.

  13. A strategic planning approach for operational-environmental tradeoff assessments in terminal areas

    Science.gov (United States)

    Jimenez, Hernando

    This thesis proposes the use of well established statistical analysis techniques, leveraging on recent developments in interactive data visualization capabilities, to quantitatively characterize the interactions, sensitivities, and tradeoffs prevalent in the complex behavior of airport operational and environmental performance. Within the strategic airport planning process, this approach is used in the assessment of airport performance under current/reference conditions, as well as in the evaluation of terminal area solutions under projected demand conditions. More specifically, customized designs of experiments are utilized to guide the intelligent selection and definition of modeling and simulation runs that will yield greater understanding, insight, and information about the inherent systemic complexity of a terminal area, with minimal computational expense. For the research documented in this thesis, a modeling and simulation environment was created featuring three primary components. First, a generator of schedules of operations, based primarily on previous work on aviation demand characterization, whereby growth factors and scheduling adjustment algorithms are applied on appropriate baseline schedules so as to generate notional operational sets representative of consistent future demand conditions. The second component pertains to the modeling and simulation of aircraft operations, defined by a schedule of operations, on the airport surface and within its terminal airspace. This component is a discrete event simulator for multiple queuing models that captures the operational architecture of the entire terminal area along with all the necessary operational logic pertaining to simulated Air Traffic Control (ATC) functions, rules, and standard practices. The third and final component is comprised of legacy aircraft performance, emissions and dispersion, and noise exposure modeling tools, that use the simulation history of aircraft movements to generate estimates

  14. Operations, Maintenance, and Replacement 10-Year Plan 1990-1999 : Environmental Strategy. Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1990-09-01

    In operating and maintaining its regional power transmission system, Bonneville Power Administration (BPA) must address environmental concerns. Pollution sources and pathways for pollution migration, including potential contamination from hazardous or toxic materials, are present. BPA must develop and follow precautionary measures, respond to emergencies, minimize wastes, redress past problems, alert and train employees to problems and safety needs, constantly evaluate this effort and update the program for improvements and changes in regulations and technology. Part of BPA's mission is to conduct its operation, maintenance, and replacement programs in an environmentally sound manner. BPA recognizes its responsibility to be good stewards of the environment. BPA will meet its environmental obligations as set forth in environmental laws and regulations. BPA intends to make consistent and measurable progress toward meeting these responsibilities. The target for the 10-Year Plan is to achieve environmental compliance and meet the following goals: (1) protect human health and the environment; (2) avoid or limit liability (3) set up an effective internal management structure to maintain compliance; and (4) achieve cost-effective compliance. 6 figs.

  15. APPLICATION OF TRAVEL TIME RELIABILITY FOR PERFORMANCE ORIENTED OPERATIONAL PLANNING OF EXPRESSWAYS

    Science.gov (United States)

    Mehran, Babak; Nakamura, Hideki

    Evaluation of impacts of congestion improvement scheme s on travel time reliability is very significant for road authorities since travel time reliability repr esents operational performance of expressway segments. In this paper, a methodology is presented to estimate travel tim e reliability prior to implementation of congestion relief schemes based on travel time variation modeling as a function of demand, capacity, weather conditions and road accident s. For subject expressway segmen ts, traffic conditions are modeled over a whole year considering demand and capacity as random variables. Patterns of demand and capacity are generated for each five minute interval by appl ying Monte-Carlo simulation technique, and accidents are randomly generated based on a model that links acci dent rate to traffic conditions. A whole year analysis is performed by comparing de mand and available capacity for each scenario and queue length is estimated through shockwave analysis for each time in terval. Travel times are estimated from refined speed-flow relationships developed for intercity expressways and buffer time index is estimated consequently as a measure of travel time reliability. For validation, estimated reliability indices are compared with measured values from empirical data, and it is shown that the proposed method is suitable for operational evaluation and planning purposes.

  16. Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Potable Water System Operations Plan

    Energy Technology Data Exchange (ETDEWEB)

    Ocampo, Ruben P. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bellah, Wendy [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-03-04

    The existing Lawrence Livermore National Laboratory (LLNL) Site 300 drinking water system operation schematic is shown in Figures 1 and 2 below. The sources of water are from two Site 300 wells (Well #18 and Well #20) and San Francisco Public Utilities Commission (SFPUC) Hetch-Hetchy water through the Thomas shaft pumping station. Currently, Well #20 with 300 gallons per minute (gpm) pump capacity is the primary source of well water used during the months of September through July, while Well #18 with 225 gpm pump capacity is the source of well water for the month of August. The well water is chlorinated using sodium hypochlorite to provide required residual chlorine throughout Site 300. Well water chlorination is covered in the Lawrence Livermore National Laboratory Experimental Test Site (Site 300) Chlorination Plan (“the Chlorination Plan”; LLNL-TR-642903; current version dated August 2013). The third source of water is the SFPUC Hetch-Hetchy Water System through the Thomas shaft facility with a 150 gpm pump capacity. At the Thomas shaft station the pumped water is treated through SFPUC-owned and operated ultraviolet (UV) reactor disinfection units on its way to Site 300. The Thomas Shaft Hetch- Hetchy water line is connected to the Site 300 water system through the line common to Well pumps #18 and #20 at valve box #1.

  17. Advanced energy design and operation technologies research: Recommendations for a US Department of Energy multiyear program plan

    Energy Technology Data Exchange (ETDEWEB)

    Brambley, M.R.; Crawley, D.B.; Hostetler, D.D.; Stratton, R.C.; Addision, M.S.; Deringer, J.J.; Hall, J.D.; Selkowitz, S.E.

    1988-12-01

    This document describes recommendations for a multiyear plan developed for the US Department of Energy (DOE) as part of the Advanced Energy Design and Operation Technologies (AEDOT) project. The plan is an outgrowth of earlier planning activities conducted for DOE as part of design process research under the Building System Integration Program (BSIP). The proposed research will produce intelligent computer-based design and operation technologies for commercial buildings. In this document, the concept is explained, the need for these new computer-based environments is discussed, the benefits are described, and a plan for developing the AEDOT technologies is presented for the 9-year period beginning FY 1989. 45 refs., 37 figs., 9 tabs.

  18. Hybrid modelling for ATES planning and operation in the Utrecht city centre

    Science.gov (United States)

    Jaxa-Rozen, Marc; Bloemendal, Martin; Kwakkel, Jan; Rostampour, Vahab

    2016-04-01

    Aquifer Thermal Energy Storage (ATES) systems can significantly reduce the energy use and greenhouse gas emissions of buildings in temperate climates. However, the rapid adoption of these systems has evidenced a number of emergent issues with the operation and management of urban ATES systems, which require careful spatial planning to avoid thermal interferences or conflicts with other subsurface functions. These issues have become particularly relevant in the Netherlands, which are currently the leading market for ATES (Bloemendal et al., 2015). In some urban areas of the country, the adoption of ATES technology is thus becoming limited by the available subsurface space. This scarcity is partly caused by current approaches to ATES planning; as such, static permits tend to overestimate pumping rates and yield excessive safety margins, which in turn hamper the energy savings which could be realized by new systems. These aspects are strongly influenced by time-dependent dynamics for the adoption of ATES systems by building owners and operators, and by the variation of ATES well flows under uncertain conditions for building energy demand. In order to take these dynamics into account, previous research (Jaxa-Rozen et al., 2015) introduced a hybrid simulation architecture combining an agent-based model of ATES adoption, a Matlab control design, and a MODFLOW/SEAWAT aquifer model. This architecture was first used to study an idealized case of urban ATES development. This case evidenced a trade-off between the thermal efficiency of individual systems and the collective energy savings realized by ATES systems within a given area, which had already been suggested by other research (e.g. Sommer et al., 2015). These results also indicated that current layout guidelines may be overly conservative, and limit the adoption of new systems. The present study extends this approach to a case study of ATES planning in the city centre of Utrecht, in the Netherlands. This case is

  19. US Department of Energy Oak Ridge Operations Environmental Management Public Involvement Plan for the Oak Ridge Reservation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This document was prepared in accordance with CERCLA requirements for writing community relations plans. It includes information on how the DOE Oak Ridge Operations Office prepares and executes Environmental Management Community relations activities. It is divided into three sections: the public involvement plan, public involvement in Oak Ridge, and public involvement in 1995. Four appendices are also included: environmental management in Oak Ridge; community and regional overview; key laws, agreements, and policy; and principal contacts.

  20. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  1. Development of an Implementation Plan Related to Biological Opinion on Operation of the Federal Columbia River Power System ; Step 1: Review and Critique of Implementation Plans.

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, Duane A.; Bunn, Amoret

    2000-12-01

    The Draft Biological Opinion on Operation of the Federal Columbia River Power System calls for the development of 1- and 5-year implementation plans. These plans will provide the roadmap for planning and subsequent implementation of actions intended to meet specific performance standards (i.e., biological objectives) in a timely manner. To develop implementation plans the key tasks and sequences of steps must be determined. Those responsible for specific tasks must be identified and they must understand what they need to do. There must be assurances that the resources (human, physical, and fiscal) to complete the tasks are available. Motivation and incentive systems should be set up. Systems to coordinate efforts and guide activity must be devised and installed. An information management system must be designed to manage and analyze data and ensure that appropriate data are collected. This will aid managers in assessing whether individual activities or actions are tracking with stated goals and objectives. Training programs to improve managerial and worker capability in making and implementing plans should be designed. Managerial leadership to guide the efforts of all individuals in achieving the goals of the anadromous and resident fish recovery must be developed. It is the entire process of managing fish recovery in relationship to the Biological Opinion that will guide, coordinate, motivate, and control work and determine the effectiveness and efficiency of plan implementation.

  2. Tank waste remediation system operation and utilization plan,vol. I {ampersand} II

    Energy Technology Data Exchange (ETDEWEB)

    Kirkbride, R.A.

    1997-09-01

    The U.S. Department of Energy Richland Operations Office (RL) is in the first stages of contracting with private companies for the treatment and immobilization of tank wastes. The components of tank waste retrieval, treatment, and immobilization have been conceived in two phases (Figure 1.0-1). To meet RL's anticipated contractual requirements, the Project Hanford Management Contractor (PHMC) companies will be required to provide waste feeds to the private companies consistent with waste envelopes that define the feeds in terms of quantity, and concentration of both chemicals and radionuclides. The planning that supports delivery of the feed must be well thought out in four basic areas: (1) Low-activity waste (LAW)/high-level waste (HLW) feed staging plans. How is waste moved within the existing tanks to deliver waste that corresponds to the defined feed envelopes to support the Private Contractor's processing schedule and processing rate? (2) Single-shell tank (SST) retrieval sequence. How are Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1994) milestones for SST retrieval integrated into the Phase I processing to set the stage for Phase II processing to complete the mission? (3) Tank Waste Remediation System (TWRS) process flowsheet. How do materials flow from existing tank inventories through: (1) blending and pretreatment functions in the double-shell tanks (DSTs), (2) contractor processing facilities, and (3) stored waste forms (Figure 1.0-2); (4) Storage and disposal of the immobilized low-activity waste (ILAW) and immobilized high-level waste (IHLW) product. How is the ILAW and IHLW product received from the private companies, the ILAW disposed onsite, and the IHLW stored onsite until final disposal?

  3. Real-time shipboard displays for science operation and planning on CGC Healy

    Science.gov (United States)

    Roberts, S.; Chayes, D.; Arko, R.

    2007-12-01

    To facilitate effective science planning and decision making, we have developed a real-time geospatial browser and other displays widely used by many if not all members of USCGC Healy's science cruises and some officers and crew since 2004. In order to enable a 'zero-configuration' experience to the end user with nearly any modern browser, on any platform, anywhere on the ship with wired (or wireless) network access, we chose a Web-based/server-centric approach that provides a very low barrier to access in an environment where we have many participants constantly coming and going, often with their own computers. The principle interface for planning and operational decision making is a georeferenced, Web-based user interface built on the MapServer Web GIS platform developed at the University of Minnesota (http://mapserver.gis.umn.edu/), using the PostGIS spatial database extensions (http://postgis.refractions.net/) to enable live database connectivity. Data available include current ship position and orientation, historical ship tracks and data, seafloor bathymetry, station locations, RADARSAT, and subbottom profiles among others. In addition to the user interfaces that are part of individual instrumentation (such as the sonars and navigation systems), custom interfaces have been developed to centralize data with high update rates such as sea surface temperature, vessel attitude, position, etc. Underlying data acquisition and storage is provided by the Lamont Data System (LDS) and the NOAA SCS system. All data are stored on RAIDed disk systems and shared across a switched network with a gigabit fiber backbone. The real-time displays access data in a number of ways including real-time UDP datagrams from LDS, accessing files on disk, and querying a PostgreSQL relational backend. This work is supported by grants from the U.S. National Science Foundation, Office of Polar Programs, Arctic Science section.

  4. New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B

    Energy Technology Data Exchange (ETDEWEB)

    L. O. Nelson

    2003-09-01

    This operations and maintenance plan supports the New Pump and Treat Facility (NPTF) remedial action work plan and identifies the approach and requirements for the operations and maintenance activities specific to the final medical zone treatment remedy. The NPTF provides the treatment system necessary to remediate the medical zone portion of the OU 1-07B contaminated groundwater plume. Design and construction of the New Pump and Treat Facility is addressed in the NPTF remedial action work plan. The scope of this operation and maintenance plan includes facility operations and maintenance, remedy five-year reviews, and the final operations and maintenance report for the NPTF.

  5. NATO Phase Zero Contracting - A Proposed Strategic and Operational Planning Construct Within the NATO Framework for Defense Planning and Standardization

    Science.gov (United States)

    2015-02-12

    ethical business protocols; • Primary and secondary customers/supported units and nations; • Anticipated requirements (in relative time-phase...prowess. And, critical to business operations integrity, the STANAG creation can incorporate tenets of ethical and sound business practices in contracting...Expeditionary Operations, Defense Acquisition Review Journal , October 2013, Volume 20, pages 349-372. Acquisition Research Program Graduate School of Business

  6. Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

    Science.gov (United States)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

  7. Earthquake Early Warning using a Seismogeodetic Approach: An operational plan for Cascadia

    Science.gov (United States)

    Crowell, B. W.; Bodin, P.; Vidale, J. E.; Schmidt, D. A.; Melbourne, T. I.; Scrivner, C. W.; Santillan, V. M.; Szeliga, W. M.; Minson, S. E.; Bock, Y.; Melgar, D.

    2013-12-01

    We present an operational plan for implementing combined seismic and geodetic time series in an earthquake early warning system for Cascadia. The Cascadian subduction zone presents one of the greatest risks for a megaquake in the continental United States. Ascertaining the full magnitude and extent of large earthquakes is problematic for earthquake early warning systems due to instability when double integrating strong-motion records to ground displacement. This problem can be mitigated by augmenting earthquake early warning systems with real-time GPS data, allowing for the progression and spatial extent of large earthquakes to be better resolved due to GPS's ability to measure both dynamic and permanent displacements. The Pacific Northwest Seismic Network (PNSN) at the University of Washington is implementing an integrated seismogeodetic approach to earthquake early warning. Regional GPS data are provided by the Pacific Northwest Geodetic Array (PANGA) at Central Washington University. Precise Point Positioning (PPP) solutions are sent from PANGA to the PNSN through JSON formatted streams and processed with a Python-based quality control (QC) module. The QC module also ingest accelerations from PNSN seismic stations through the Earthworm seismic acquisition and processing system for the purpose of detecting outliers and Kalman filtering when collocated instruments exist. The QC module outputs time aligned and cleaned displacement waveforms to ActiveMQ, an XML-based messaging broker that is currently used in seismic early warning architecture. Earthquake characterization modules read displacement information from ActiveMQ when triggered by warnings from ElarmS earthquake early warning algorithm. Peak ground displacement and P-wave scaling relationships from Kalman filtered waveforms provide initial magnitude estimates. Additional modules perform more complex source modeling such as centroid moment tensors and slip inversions that characterize the full size and

  8. Improving Planning and Post-Operative Assessment for Total Hip Arthroplasty

    Science.gov (United States)

    Pétursson, Þröstur; Edmunds, Kyle; Magnúsdóttir, Gígja; Halldórsson, Grétar; jr., Halldór Jónsson; Gargiulo, Paolo

    2015-01-01

    Total Hip Arthroplasty (THA) remains the gold standard of treatment for patients who suffer with a variety of hip-related pathological degeneration or trauma. These patients often exhibit significantly less post-operative pain and an increase in the range of motion of the joint, but there are still relatively common instances of debilitating periprosthetic complications that call into question the method for pre-surgical implant choice. Currently, there are two principal options for THA prostheses: cemented or non cemented. Utilizing the cemented procedure ensures a faster acquisition of adequate implant stability than with the non cemented procedure, but can eventually lead to an increased periprosthetic fracture risk. Non cemented prosthetic stems are more frequently revised within the first few years following THA due to periprosthetic fracture, but non cemented revision surgeries generally result in fewer complications than those of cemented implants. Surgeons typically rely on experience or simple patient metrics such as age and sex to prescribe which implant procedure is optimal, and while this may work for most patients, there is a clear need to analyze more rigoriously patient conditions that correlate to optimal post-THA outcomes. The results from the investigation reported herein indicate that an understanding of how the percent composition and quality of a patient's quadriceps muscle in both healthy and operated legs may be a better indicator for prosthetic choice. Additionally, these data emphasize that the traditional metrics of age and sex inadequately predict changes in quadriceps composition and quality and thereby have comparatively minor utility in determining the patient-appropriate prosthetic type. Key Words: Total Hip Arthroplasty, Prosthetic selection, Muscle size and quality, Anatomical modeling, Surgical planning. PMID:26913152

  9. The Services Need To Improve Accuracy When Initially Assigning Demilitarization Codes

    Science.gov (United States)

    2014-11-07

    10,478 2,798 27 Navy 9,214 1,832 20 Air Force 11,021 3,680 33 Marine Corps 1,027 195 19 Special Operations Command 1,587 363 23 Defense Logistics Agency...Categories Category Description 0 Nuclear Materials, Facilities and Equipment and Miscellaneous 1 Materials, Chemicals, Microorganisms , and Toxins 2...Avionics 8 Marine 9 Propulsion Systems, Space Vehicles and Related Equipment Appendixes 20 │ DODIG-2015-031 Appendix D Other Matters of Interest Army

  10. Three essays on the effect of wind generation on power system planning and operations

    Science.gov (United States)

    Davis, Clay Duane

    While the benefits of wind generation are well known, some drawbacks are still being understood as wind power is integrated into the power grid at increasing levels. The primary difference between wind generation and other forms of generation is the intermittent, and somewhat unpredictable, aspect of this resource. The somewhat uncontrollable aspect of wind generation makes it important to consider the relationship between this resource and load, and also how the operation of other non-wind generation resources may be affected. The three essays that comprise this dissertation focus on these and other important issues related to wind generation; leading to an improved understanding of how to better plan for and utilize this resource. The first essay addresses the cost of increased levels of installed wind capacity from both a capacity planning and economic dispatch perspective to arrive at the total system cost of installing a unit of wind capacity. This total includes not only the cost of the wind turbine and associated infrastructure, but also the cost impact an additional unit of wind capacity has on the optimal mix and operation of other generating units in the electricity supply portfolio. The results of the model showed that for all wind expansion scenarios, wind capacity is not cost-effective regardless of the level of the wind production tax credit and carbon prices that were considered. Larger levels of installed wind capacity result in reduced variable cost, but this reduction is not able to offset increases in capital cost, as a unit of installed wind capacity does not result in an equal reduction in other non-wind capacity needs. The second essay develops a methodology to better handle unexpected short term fluctuations in wind generation within the existing power system. The methodology developed in this essay leads to lower expected costs by anticipating and planning for fluctuations in wind generation by focusing on key constraints in the system. The

  11. U.S. Department of the Interior Southeast Climate Science Center Science and Operational Plan

    Science.gov (United States)

    Jones, Sonya A.; Dalton, Melinda S.

    2012-01-01

    to its impacts on tribes and the land, water, ocean, fish and wildlife, and cultural-heritage resources that DOI manages. The NCCWSC is establishing a network of eight DOI CSCs (Alaska, Southeast, Northwest, North Central, Pacific Islands, Southwest, Northeast, and South Central) that will work with a variety of partners and stakeholders to provide resource managers the tools and information they need to help them anticipate and adapt conservation planning and design for projected climate change. The Southeast CSC, a federally led research collaboration hosted by North Carolina State University, was established in 2010. The Southeast CSC brings together the expertise of federal and university scientists to address climate-change priority needs of federal, state, non-governmental, and tribal resource managers. This document is the first draft of a science and operational plan for the Southeast CSC. The document describes operational considerations, provides the context for climate-change impacts in the Southeastern United States, and establishes six major science themes the Southeast CSC will address in collaboration with partners. This document is intended to be reevaluated and modified as partner needs change.

  12. The Database for Astronomical Spectroscopy - Updates, Additions and Plans for Splatalogue for Alma Full Science Operations

    Science.gov (United States)

    Remijan, Anthony; Seifert, Nathan A.; McGuire, Brett A.

    2016-06-01

    For the past 10 years, Splatalogue has been constantly updated, modified and enhanced in order to make molecular spectroscopy data readily available to the astronomical community. Splatalogue is fully integrated into the ALMA Observing Tool, the ALMA data reduction and analysis package (CASA) and several enhanced tools being developed through the ALMA development program including the next generation CASA viewer (CARTA) and the ALMA Data Mining Toolkit (ADMIT). In anticipation for ALMA full science operations, a number of improvements have taken place over the past year to the Splatalogue database including, but not limited too, additions to Splatalogue from the JPL and CDMS line lists, improvements and reconciliation of the Lovas/NIST Catalog assigning NRAO recommended rest frequencies to every astronomically detected transition, including recent astronomical surveys to the list of transitions detected in space and finally, improved search and display features as requested by the astronomical community. Splatalogue is planning for the next 10 years of development and welcomes any and all contributions to improving the data integrity and availability to the scientific community.

  13. DOES THE MRP LOGIC WORK FOR FINITE CAPACITY PLANNING AND OPERATIONS SCHEDULING?

    Directory of Open Access Journals (Sweden)

    V.K Turner

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: During the past five years, MRP based systems have increasingly been criticized for their inability to reduce inventory levels, meet due dates and to plan at an operational level. This paper suggests that the actual reasons for these problems are some fundamental flaws in the MRP logic and its assumptions. The logic of the optimized Production Technology (OPT is suggested as an alternative approach that addresses the limitations of MRP based systems.

    AFRIKAANSE OPSOMMING: Gedurende die afgelope vyf jaar het kritiek teen MRP-gebaseerde sisteme toegeneem. Die kritiek is hoofsaaklik dat MRP-sisteme vooraadvlakke nie voldoende verminder nie; beplande datums nie haal nie en ook nie op In operasionele vlak beplan nie. Hierdie artikel wil voorstel dat die rede hiervoor fundamentele foute in die MRP logika en aannames is. Die logika van "optimized Production Technology" (OPT word as alternatief voorgestel, aangesien dit die probleemareas in die MRP-logika aanspreek.

  14. A case method for Sales and Operations Planning: a learning experience from Germany

    Directory of Open Access Journals (Sweden)

    Luiz Felipe Scavarda

    Full Text Available Abstract Adequate preparation, learning, and training is required for Sales and Operations Planning (S&OP to aid organizations in achieving the full expected benefits from its implementation. This paper presents a case method for S&OP and the learning experience of its application at the University of Münster (Germany. The “constructive alignment principle” was applied with a “team teaching” approach, involving an executive from the case company. Students improved their knowledge on S&OP and their analytical skills by understanding the conceptual S&OP building blocks and by learning how to deal with them to provide a solution for a case based on a real-life situation. The learning results were evaluated positively during the discipline’s student evaluation of teaching (SET. The applied case method enhanced the student’s motivation and engagement (e.g., higher preparation effort and class attendance, which were considered higher than in other disciplines with the traditional lecture-based education.

  15. Wind Turbine Blade Life-Time Assessment Model for Preventive Planning of Operation and Maintenance

    Directory of Open Access Journals (Sweden)

    Mihai Florian

    2015-09-01

    Full Text Available Out of the total wind turbine failure events, blade damage accounts for a substantial part, with some studies estimating it at around 23%. Current operation and maintenance (O&M practices typically make use of corrective type maintenance as the basic approach, implying high costs for repair and replacement activities as well as large revenue losses, mainly in the case of offshore wind farms. The recent development and evolution of condition monitoring techniques, as well as the fact that an increasing number of installed turbines are equipped with online monitoring systems, offers a large amount of information on the blades structural health to the decision maker. Further, inspections of the blades are often performed in connection with service. In light of the obtained information, a preventive type of maintenance becomes feasible, with the potential of predicting the blades remaining life to support O&M decisions for avoiding major failure events. The present paper presents a fracture mechanics based model for estimating the remaining life of a wind turbine blade, focusing on the crack propagation in the blades adhesive joints. A generic crack propagation model is built in Matlab based on a Paris law approach. The model is used within a risk-based maintenance decision framework to optimize maintenance planning for the blades lifetime.

  16. Health and safety plan for operations performed for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Trippet, W.A. II (IT Corp., (United States)); Reneau, M.; Morton, S.L. (EG and G Idaho, Inc., Idaho Falls, ID (United States))

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  17. Searching for order within chaos: complexity theory’s implications to intelligence support during joint operational planning.

    Science.gov (United States)

    2017-06-09

    subsumes Chaos Theory, Complexity Theory techniques have been evaluated to identify potential utilization during joint intelligence analysis ...Although joint intelligence analysis describes analyzing systems from a holistic systems perspective, most analytic techniques are reductionist in nature... Intelligence Analysis , Joint Operational Planning, Cellular Automata, Agent-Based Modeling 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT 18

  18. Increasing Student Interest and Comprehension of Production Planning and Control and Operations Performance Measurement Concepts Using a Production Line Game

    Science.gov (United States)

    Cox, James F., III; Walker, Edward D., II

    2005-01-01

    Production planning and control (PPC) systems and operations performance measures are topics that students generally find both boring and difficult to understand. In the article, the authors present a production line game that they have found to be an effective tool to increase student interest in the topics as well as student comprehension. The…

  19. Introduction of composite reliability evaluation in power system operation planning; Introducao da confiabilidade composta no planejamento da operacao eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Mello, J.C.O. [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Schilling, M.T.; Gomes, P. [ELETROBRAS, Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This paper gives an overview of an ongoing, detailed and first-hand investigation about the current reliability levels of the Brazilian power system, as seen from the electrical operation planning point-of-view. A set of practical results are presented and commented. (author) 41 refs., 4 figs., 4 tabs.

  20. The Flexible Solar Utility. Preparing for Solar's Impacts to Utility Planning and Operations

    Energy Technology Data Exchange (ETDEWEB)

    Sterling, John [Solar Electric Power Association (SEPA), Washington, DC (United States); Davidovich, Ted [Solar Electric Power Association (SEPA), Washington, DC (United States); Cory, Karlynn [National Renewable Energy Lab. (NREL), Golden, CO (United States); Aznar, Alexandra [National Renewable Energy Lab. (NREL), Golden, CO (United States); McLaren, Joyce [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    This paper seeks to provide a flexible utility roadmap for identifying the steps that need to be taken to place the utility in the best position for addressing solar in the future. Solar growth and the emergence of new technologies will change the electric utility of tomorrow. Although not every utility, region, or market will change in the same way or magnitude, developing a path forward will be needed to reach the Electric System of the Future in the coming decades. In this report, a series of potential future states are identified that could result in drastically different energy mixes and profiles: 1) Business as Usual, 2) Low Carbon, Centralized Generation, 3) Rapid Distributed Energy Resource Growth, 4) Interactivity of Both the Grid and Demand, and 5) Grid or Load Defection. Complicating this process are a series of emerging disruptions; decisions or events that will cause the electric sector to change. Understanding and preparing for these items is critical for the transformation to any of the future states to be successful. Predicting which future state will predominate 15 years from now is not possible; however, utilities still will need to look ahead and try to anticipate how factors will impact their planning, operations, and business models. In order to dig into the potential transformations facing the utility industry, the authors conducted a series of utility interviews, held a working session at a major industry solar conference, and conducted a quantitative survey. To focus conversations, the authors leveraged the Rapid Distributed Energy Resource (DER) Growth future to draw out how utilities would have to adapt from current processes and procedures in order to manage and thrive in that new environment. Distributed solar was investigated specifically, and could serve as a proxy resource for all distributed generation (DG). It can also provide the foundation for all DERs.

  1. Human Factors Guidance for Control Room and Digital Human-System Interface Design and Modification, Guidelines for Planning, Specification, Design, Licensing, Implementation, Training, Operation and Maintenance

    Energy Technology Data Exchange (ETDEWEB)

    R. Fink, D. Hill, J. O' Hara

    2004-11-30

    Nuclear plant operators face a significant challenge designing and modifying control rooms. This report provides guidance on planning, designing, implementing and operating modernized control rooms and digital human-system interfaces.

  2. Microbiological sampling plan based on risk classification to verify supplier selection and production of served meals in food service operation.

    Science.gov (United States)

    Lahou, Evy; Jacxsens, Liesbeth; Van Landeghem, Filip; Uyttendaele, Mieke

    2014-08-01

    Food service operations are confronted with a diverse range of raw materials and served meals. The implementation of a microbial sampling plan in the framework of verification of suppliers and their own production process (functionality of their prerequisite and HACCP program), demands selection of food products and sampling frequencies. However, these are often selected without a well described scientifically underpinned sampling plan. Therefore, an approach on how to set-up a focused sampling plan, enabled by a microbial risk categorization of food products, for both incoming raw materials and meals served to the consumers is presented. The sampling plan was implemented as a case study during a one-year period in an institutional food service operation to test the feasibility of the chosen approach. This resulted in 123 samples of raw materials and 87 samples of meal servings (focused on high risk categorized food products) which were analyzed for spoilage bacteria, hygiene indicators and food borne pathogens. Although sampling plans are intrinsically limited in assessing the quality and safety of sampled foods, it was shown to be useful to reveal major non-compliances and opportunities to improve the food safety management system in place. Points of attention deduced in the case study were control of Listeria monocytogenes in raw meat spread and raw fish as well as overall microbial quality of served sandwiches and salads.

  3. Behavioral Health and Performance at NASA JSC: Recent Successes and Future Plan for BHP Research and Operations

    Science.gov (United States)

    Leveton, L. B.; VanderArk, S. T.

    2014-01-01

    The Behavioral Health and Performance discipline at NASA Johnson Space Center is organized into two distinct Divisions (Biomedical Research and Environmental Science Division and Space and Clinical Operations Division) but is integrated and interrelated in its day-to-day work. Ongoing operations supporting NASA's spaceflight goals benefit from the research portfolios that address risks to mission success. Similarly, these research portfolios are informed by operations to ensure investigations stay relevant given the dynamic environment of spaceflight. There are many success stories that can be presented where initial work begun as a BHP Research project, and funded through the Human Research Program, was fully implemented in operations or addressed an operational need. Examples include improving effectiveness of the debriefings used within Mission Control by the Mission Operations Directorate and countermeasures for fatigue management. There is also ongoing collaboration with research and operations for developing selection methods for future generation astronauts, and to enhance and inform the current family support function. The objective of this panel is to provide examples of recent success stories, describe areas where close collaboration is benefitting ongoing research and operations, and summarize how this will come together as NASA plans for the one year ISS mission - a unique opportunity for both BHP operations and research to learn more about preparing and supporting crewmembers for extended missions in space. The proposed panel will be comprised of six presentations, each describing a unique aspect of research or operations and the benefits to current and future spaceflight.

  4. 10 CFR 436.102 - General operations plan format and content.

    Science.gov (United States)

    2010-01-01

    ... coordination with DOE with respect to energy matters; (B) designation of a middle-level staff member as a point... of key staff members within the agency who are responsible for technical inputs to the plan or... control measures such as inspections, audits, and others; and (vi) An Emergency Conservation Plan Summary...

  5. Risk Management Plan for Tank Farm Restoration and Safe Operations Project W-314

    Energy Technology Data Exchange (ETDEWEB)

    MCGREW, D.L.

    2000-04-19

    The Risk Management Plan for Project W-314 describes the systems, processes and procedures for implementation of applicable risk management practices described in HNF-0842, Volume IV, Section 2.6, ''Risk Management''. This plan is tailored specifically for use by Project W-314.

  6. How can we better plan for the unplanned? Designing and operating more robust public transport systems

    NARCIS (Netherlands)

    Cats, O.

    2015-01-01

    Traditionally, transport systems have been designed to perform well under normal conditions assuming that everything works as planned. As anyone that uses public transport can testify, deviations from planning are a recurrent phenomenon. Investments in public transport are therefore increasingly mot

  7. Systems Engineering Management Plan for Tank Farm Restoration and Safety Operations Project W-314

    Energy Technology Data Exchange (ETDEWEB)

    MCGREW, D.L.

    2000-04-19

    The Systems Engineering Management Plan for Project W-314 has been prepared within the guidelines of HNF-SD-WM-SEMP-002, TWRS Systems Engineering Management Plan. The activities within this SEMP have been tailored, in accordance with the TWRS SEMP and DOE Order 430.1, Life Cycle Asset Management, to meet the needs of the project.

  8. 15 CFR 921.32 - Operation and management: Implementation of the management plan.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Operation and management... Reserve Designation and Subsequent Operation § 921.32 Operation and management: Implementation of the... funds to assist the state in the operation and management of the Reserve including the management...

  9. SIMULATION OF CARS ACCUMULATION PROCESSES FOR SOLVING TASKS OF OPERATIONAL PLANNING IN CONDITIONS OF INITIAL INFORMATION UNCERTAINTY

    Directory of Open Access Journals (Sweden)

    О. A. Tereshchenko

    2017-06-01

    Full Text Available Purpose. The article highlights development of the methodological basis for simulation the processes of cars accumulation in solving operational planning problems under conditions of initial information uncertainty for assessing the sustainability of the adopted planning scenario and calculating the associated technological risks. Methodology. The solution of the problem under investigation is based on the use of general scientific approaches, the apparatus of probability theory and the theory of fuzzy sets. To achieve this purpose, the factors influencing the entropy of operational plans are systematized. It is established that when planning the operational work of railway stations, sections and nodes, the most significant factors that cause uncertainty in the initial information are: a external conditions with respect to the railway ground in question, expressed by the uncertainty of the timing of cars arrivals; b external, hard-to-identify goals for the functioning of other participants in the logistics chain (primarily customers, expressed by the uncertainty of the completion time with the freight cars. These factors are suggested to be taken into account in automated planning through statistical analysis – the establishment and study of the remaining time (prediction errors. As a result, analytical dependencies are proposed for rational representation of the probability density functions of the time residual distribution in the form of point, piecewise-defined and continuous analytic models. The developed models of cars accumulation, the application of which depends on the identified states of the predicted incoming car flow to the accumulation system, are presented below. In addition, the last proposed model is a general case of models of accumulation processes with an arbitrary level of reliability of the initial information for any structure of the incoming flow of cars. In conclusion, a technique for estimating the results of

  10. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

  11. Project Execution Plan, Waste Management Division, Nevada Operations Office, U.S. Department of Energy, April 2000

    Energy Technology Data Exchange (ETDEWEB)

    DOE/NV

    2000-04-01

    This plan addresses project activities encompassed by the U.S. Department of Energy/Nevada Operations Office Waste Management Division and conforms to the requirements contained in the ''Life Cycle Asset Management,'' U.S. Department of Energy Order O430.1A; the Joint Program Office Policy on Project Management in Support of DOE Order O430.1, and the Project Execution and Engineering Management Planning Guide. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the state of Nevada; and traditional project management philosophies such as the development of life cycle costs, schedules, and work scope; identification of roles and responsibilities; and baseline management and controls.

  12. The U.S. Coast Guard’s Ports, Waterways and Coastal Security Strategy Deployment Plan: An Operational Design for Maritime Homeland Security

    Science.gov (United States)

    2006-05-31

    operational plan. Then, through the lens of Milan Vego’s Operational Design Schematic model found in Operational Warfare, vi it will show that the PWCS, while...the territorial waters of the U.S. In keeping with Milan Vego’s advice to “. . . operate along relatively short, multiple, and interior lines...smartly accomplishes Vego’s edict , “Favorable lines of operations and communications facilitate protection of one’s own forces’ operational center of

  13. 76 FR 40457 - Administrative Simplification: Adoption of Operating Rules for Eligibility for a Health Plan and...

    Science.gov (United States)

    2011-07-08

    ... the regulatory history, see the proposed rule entitled ``Health Insurance Reform; Modifications to the Health Insurance Portability and Accountability Act (HIPAA) Electronic Transaction Standards,'' published... Insurance Portability and Accountability Act of 1996 (HIPAA) transactions: eligibility for a health plan and...

  14. Operational Plan and Environmental Assessment for Striped Skunk and Raccoon Management : Benton Lake National Wildlife Refuge

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The action proposed in this plan is to trap and remove striped skunk and raccoon at Benton Lake National Wildlife Refuge. The purpose of the action is to manage, not...

  15. Straighttalk. The ideal master facility plan begins with business strategy and integrates operational improvement.

    Science.gov (United States)

    Powder, Scott; Brown, Richard E; Haupert, John M; Smith, Ryder

    2007-04-02

    Given the scarcity of capital to meet ever-growing demands for healthcare services, master facility planning has become more important than ever. Executives must align their master facility plans with their overall business strategy, incorporating the best in care- and service-delivery models. In this installment of Straight Talk, executives from two health systems--Advocate Health Care in Oak Brook, Ill. and Parkland Health & Hospital System in Dallas--discuss master facility planning. Modern Healthcare and PricewaterhouseCoopers present Straight Talk. The session on master facility planning was held on March 8, 2007 at Modern Healthcare's Chicago Headquarters. Charles Lauer, former vice president of publishing and editorial director at Modern Healthcare, was the moderator.

  16. 75 FR 37883 - Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities

    Science.gov (United States)

    2010-06-30

    ... planning processes provide an incumbent transmission owner with an unfair advantage over merchant and... provider with an undue advantage over a nonincumbent transmission developer. Neither incumbent nor... that provides an incumbent utility with an undue advantage over nonincumbent transmission project...

  17. 76 FR 49841 - Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities

    Science.gov (United States)

    2011-08-11

    ... process, procedures for joint evaluation and sharing of information regarding the respective transmission... data and information between neighboring transmission planning regions at least annually. 9. Finally... of power flows over an interconnected transmission system. In particular, the...

  18. Seamless transitions from early prototypes to mature operational software - A technology that enables the process for planning and scheduling applications

    Science.gov (United States)

    Hornstein, Rhoda S.; Wunderlich, Dana A.; Willoughby, John K.

    1992-01-01

    New and innovative software technology is presented that provides a cost effective bridge for smoothly transitioning prototype software, in the field of planning and scheduling, into an operational environment. Specifically, this technology mixes the flexibility and human design efficiency of dynamic data typing with the rigor and run-time efficiencies of static data typing. This new technology provides a very valuable tool for conducting the extensive, up-front system prototyping that leads to specifying the correct system and producing a reliable, efficient version that will be operationally effective and will be accepted by the intended users.

  19. Tool path planning of hole-making operations in ejector plate of injection mould using modified shuffled frog leaping algorithm

    Directory of Open Access Journals (Sweden)

    Amol M. Dalavi

    2016-07-01

    Full Text Available Optimization of hole-making operations in manufacturing industry plays a vital role. Tool travel and tool switch planning are the two major issues in hole-making operations. Many industrial applications such as moulds, dies, engine block, automotive parts etc. requires machining of large number of holes. Large number of machining operations like drilling, enlargement or tapping/reaming are required to achieve the final size of individual hole, which gives rise to number of possible sequences to complete hole-making operations on the part depending upon the location of hole and tool sequence to be followed. It is necessary to find the optimal sequence of operations which minimizes the total processing cost of hole-making operations. In this work, therefore an attempt is made to reduce the total processing cost of hole-making operations by applying relatively new optimization algorithms known as shuffled frog leaping algorithm and proposed modified shuffled frog leaping algorithm for the determination of optimal sequence of hole-making operations. An industrial application example of ejector plate of injection mould is considered in this work to demonstrate the proposed approach. The obtained results by the shuffled frog leaping algorithm and proposed modified shuffled frog leaping algorithm are compared with each other. It is seen from the obtained results that the results of proposed modified shuffled frog leaping algorithm are superior to those obtained using shuffled frog leaping algorithm.

  20. Study of different logics of Planning and Control - a contribution to the strategic management of operations

    OpenAIRE

    Everaldo Antonio Rutana Pereira; Sérgio Eduardo Gouvêa da Costa; Edson Pinheiro de Lima

    2008-01-01

    Organisations are today, included in complex environments and variables that are defined by the market that is increasingly competitive. To survive to this challenge, organizations need to plan with responsibility, outlining its strategy, while maintaining appropriate control of them, seeking the conquest of the goals set out. The process of planning and control can be an arduous task since the literature is presenting a diversity of approaches that can be implemented, however, these approach...

  1. A Foundation for Operational Planning: The Concepts of Center of Gravity, Decisive Point, and the Culminating Point.

    Science.gov (United States)

    1987-04-21

    and the spring thaw. Southwestern Front farces Included the 6th Irug (40,566 menI 46 tanks), the I1st Wuards Bring (70,811 men), Moble Girup Papau...theiatn preced seulplning httoialeamls. Odfertiaons CUReR the paucity of aircraft, technology , or doctrine, concentrated armored forces produced the...with respect to theoretical concepts provides Insights for operational planning on the contemperarg battlefield. Technological and doctrinal

  2. Optimization Model for Land Treatment Planning, Design and Operation. Part 3. Model Description and User’s Guide.

    Science.gov (United States)

    1983-04-01

    land treatment equations is necessary to develop the user -supplied PARAM and INPUT files and to interpret the model results. A schematic of the system...land treatment equations and is supplied and named by the user . A total of 160 parameter values must be specified. The file must consist of 26 lines...7 AD-A134 461 OPTIMIZATION MODEL FOR LAND TREATMENT PLANNING DESIN 1/AND OPERATION PART 3..U) COLD REGIONS RESEARCH ANDENGINEERING LAB HANOVER NH J A

  3. Virtual Planning, Control, and Machining for a Modular-Based Automated Factory Operation in an Augmented Reality Environment.

    Science.gov (United States)

    Pai, Yun Suen; Yap, Hwa Jen; Md Dawal, Siti Zawiah; Ramesh, S; Phoon, Sin Ye

    2016-06-07

    This study presents a modular-based implementation of augmented reality to provide an immersive experience in learning or teaching the planning phase, control system, and machining parameters of a fully automated work cell. The architecture of the system consists of three code modules that can operate independently or combined to create a complete system that is able to guide engineers from the layout planning phase to the prototyping of the final product. The layout planning module determines the best possible arrangement in a layout for the placement of various machines, in this case a conveyor belt for transportation, a robot arm for pick-and-place operations, and a computer numerical control milling machine to generate the final prototype. The robotic arm module simulates the pick-and-place operation offline from the conveyor belt to a computer numerical control (CNC) machine utilising collision detection and inverse kinematics. Finally, the CNC module performs virtual machining based on the Uniform Space Decomposition method and axis aligned bounding box collision detection. The conducted case study revealed that given the situation, a semi-circle shaped arrangement is desirable, whereas the pick-and-place system and the final generated G-code produced the highest deviation of 3.83 mm and 5.8 mm respectively.

  4. Virtual Planning, Control, and Machining for a Modular-Based Automated Factory Operation in an Augmented Reality Environment

    Science.gov (United States)

    Pai, Yun Suen; Yap, Hwa Jen; Md Dawal, Siti Zawiah; Ramesh, S.; Phoon, Sin Ye

    2016-06-01

    This study presents a modular-based implementation of augmented reality to provide an immersive experience in learning or teaching the planning phase, control system, and machining parameters of a fully automated work cell. The architecture of the system consists of three code modules that can operate independently or combined to create a complete system that is able to guide engineers from the layout planning phase to the prototyping of the final product. The layout planning module determines the best possible arrangement in a layout for the placement of various machines, in this case a conveyor belt for transportation, a robot arm for pick-and-place operations, and a computer numerical control milling machine to generate the final prototype. The robotic arm module simulates the pick-and-place operation offline from the conveyor belt to a computer numerical control (CNC) machine utilising collision detection and inverse kinematics. Finally, the CNC module performs virtual machining based on the Uniform Space Decomposition method and axis aligned bounding box collision detection. The conducted case study revealed that given the situation, a semi-circle shaped arrangement is desirable, whereas the pick-and-place system and the final generated G-code produced the highest deviation of 3.83 mm and 5.8 mm respectively.

  5. Projectile Demilitarization Facilities

    Data.gov (United States)

    Federal Laboratory Consortium — The Projectile Wash Out Facility is US Army Ammunition Peculiar Equipment (APE 1300). It is a pilot scale wash out facility that uses high pressure water and steam...

  6. Risk-Aware Planetary Rover Operation: Autonomous Terrain Classification and Path Planning

    Science.gov (United States)

    Ono, Masahiro; Fuchs, Thoams J.; Steffy, Amanda; Maimone, Mark; Yen, Jeng

    2015-01-01

    Identifying and avoiding terrain hazards (e.g., soft soil and pointy embedded rocks) are crucial for the safety of planetary rovers. This paper presents a newly developed groundbased Mars rover operation tool that mitigates risks from terrain by automatically identifying hazards on the terrain, evaluating their risks, and suggesting operators safe paths options that avoids potential risks while achieving specified goals. The tool will bring benefits to rover operations by reducing operation cost, by reducing cognitive load of rover operators, by preventing human errors, and most importantly, by significantly reducing the risk of the loss of rovers.

  7. Implementation of a risk management plan in a hospital operating room

    Directory of Open Access Journals (Sweden)

    Li Guo

    2015-12-01

    Full Text Available A risk management program based on AS–NZS4360 risk management standards was developed and implemented in the operating room of Peking University Third Hospital. To accomplish this task, we developed a risk quantification matrix and a risk register form to identify potential risks in the operating room, and then implemented operating room policies designed to reduce or eliminate those risks. We also established a consultation mechanism and risk monitoring system designed to minimize risks to operation room nurses. Finally, we continuously seek to improve our operating room risk management capabilities, so we can continue to improve the quality of service provided and guarantee the safety of surgical patients.

  8. An operational information systems architecture for assessing sustainable transportation planning: principles and design.

    Science.gov (United States)

    Borzacchiello, Maria Teresa; Torrieri, Vincenzo; Nijkamp, Peter

    2009-11-01

    This paper offers the description of an integrated information system framework for the assessment of transportation planning and management. After an introductory exposition, in the first part of the paper, a broad overview of international experiences regarding information systems on transportation is given, focusing in particular on the relationship between transportation system's performance monitoring and the decision-making process, and on the importance of this connection in the evaluation and planning process, in Italian and European cases. Next, the methodological design of an information system to support efficient and sustainable transportation planning and management aiming to integrate inputs from several different data sources is presented. The resulting framework deploys modular and integrated databases which include data stemming from different national or regional data banks and which integrate information belonging to different transportation fields. For this reason, it allows public administrations to account for many strategic elements that influence their decisions regarding transportation, both from a systemic and infrastructural point of view.

  9. A life cycle cost economics model for projects with uniformly varying operating costs. [management planning

    Science.gov (United States)

    Remer, D. S.

    1977-01-01

    A mathematical model is developed for calculating the life cycle costs for a project where the operating costs increase or decrease in a linear manner with time. The life cycle cost is shown to be a function of the investment costs, initial operating costs, operating cost gradient, project life time, interest rate for capital and salvage value. The results show that the life cycle cost for a project can be grossly underestimated (or overestimated) if the operating costs increase (or decrease) uniformly over time rather than being constant as is often assumed in project economic evaluations. The following range of variables is examined: (1) project life from 2 to 30 years; (2) interest rate from 0 to 15 percent per year; and (3) operating cost gradient from 5 to 90 percent of the initial operating costs. A numerical example plus tables and graphs is given to help calculate project life cycle costs over a wide range of variables.

  10. A life cycle cost economics model for projects with uniformly varying operating costs. [management planning

    Science.gov (United States)

    Remer, D. S.

    1977-01-01

    A mathematical model is developed for calculating the life cycle costs for a project where the operating costs increase or decrease in a linear manner with time. The life cycle cost is shown to be a function of the investment costs, initial operating costs, operating cost gradient, project life time, interest rate for capital and salvage value. The results show that the life cycle cost for a project can be grossly underestimated (or overestimated) if the operating costs increase (or decrease) uniformly over time rather than being constant as is often assumed in project economic evaluations. The following range of variables is examined: (1) project life from 2 to 30 years; (2) interest rate from 0 to 15 percent per year; and (3) operating cost gradient from 5 to 90 percent of the initial operating costs. A numerical example plus tables and graphs is given to help calculate project life cycle costs over a wide range of variables.

  11. Terry Turbopump Expanded Operating Band Full-Scale Component and Basic Science Detailed Test Plan - Final.

    Energy Technology Data Exchange (ETDEWEB)

    Osborn, Douglas [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Solom, Matthew [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-02-01

    This document details the milestone approach to define the true operating limitations (margins) of the Terry turbopump systems used in the nuclear industry for Milestone 3 (full-scale component experiments) and Milestone 4 (Terry turbopump basic science experiments) efforts. The overall multinational-sponsored program creates the technical basis to: (1) reduce and defer additional utility costs, (2) simplify plant operations, and (3) provide a better understanding of the true margin which could reduce overall risk of operations.

  12. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-09-19

    The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

  13. LeanERP® Mobile Platform Solution for Planning, Visualization and Execution of Business Operations in MSME Unit

    Directory of Open Access Journals (Sweden)

    Dr . Jayakumar Karuppusamy

    2013-02-01

    Full Text Available The paper presents the design and development of a solution framework for a LeanERP® interactive application for use with mobile handheld devices, which enables profile based activity logging, planning and execution of tasks, information sharing, collaboration and decision support aligned with the enterprise operations. The design leverages intelligence with the use of cognitive approaches, classifier systems and a data driven approach for adaptive profiling and configuration of software behavior. The solution is well suited for MSME units as the architecture is designed on the basis of a SOA for rapid adaptation and deployment for a given cluster and presents an engaging role centric GUI with multiple widgets and tabs for dynamic visualization of information relating to enterprise operations with trails and traceability of process flows, events, activities, analysis and cost estimates. The solution integrates mechanisms, data structures, algorithms and associated computational models that enable presentation of performance characteristics, predictions and appropriate options for decisions relating to various operations

  14. 77 FR 32183 - Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities

    Science.gov (United States)

    2012-05-31

    .... Framework To Evaluate Transmission Projects 431 Submitted for Selection in the Regional Plan for Purposes of... Commission required all public utility transmission providers to adopt a framework that requires, among other... Motor Vehicles Mfrs. Ass'n of U.S. v. State Farm Mut. Auto Ins. Co., 463 U.S. 29, 43 (1983) (State Farm...

  15. Planning of Combat Operations and Command of Troops with the Aid of Network Graphs,

    Science.gov (United States)

    1985-01-14

    Accession For Country of origin: USSR R ---- V This document is a machine translation. NTIS GAi Requester: FTD/TQFO DTIC TAB Approved for public release...V. Proskuryakov . Network planning and control. Publ. of MVTU [MBTY - Moscow Higher Technical School] im. Baumann. 7. Basic condition/positions on

  16. Guide for Developing High-Quality Emergency Operations Plans for Institutions of Higher Education

    Science.gov (United States)

    Office of Safe and Healthy Students, US Department of Education, 2013

    2013-01-01

    Our nation's postsecondary institutions are entrusted to provide a safe and healthy learning environment for students, faculty, and staff who live, work, and study on campus. Many of these emergencies occur with little to no warning; therefore, it is critical for institutions of higher education (IHEs) to plan ahead to help ensure the safety and…

  17. Beginning With the End in Mind: Post-Conflict Operations and Campaign Planning

    Science.gov (United States)

    2007-11-02

    Military Studies guest speaker program, 2004-05 academic year. 74 Andrew Steel and Andrew Marriot , “Briefing on Peace Support Operations,” (United...truth/interviews/perito.html. Steel, Andrew, Grp Cpt and Marriot , Andrew LTC. Briefing on Peace Support Operations. Ministry of Defence, United

  18. 36 CFR 292.66 - Operating plan requirements-outstanding mineral rights.

    Science.gov (United States)

    2010-07-01

    ... other improvements to be used; (4) A description of the type of operations which includes, at a minimum, a list of the type, size, location, and number of structures, facilities, and other improvements to... products, insecticides, pesticides, and herbicides that will be used during the mineral operation and...

  19. Grid-Integrated Distributed Solar: Addressing Challenges for Operations and Planning, Greening the Grid

    Energy Technology Data Exchange (ETDEWEB)

    Coddington, Michael; Miller, Mackay; Katz, Jessica

    2016-03-01

    Greening the Grid provides technical assistance to energy system planners, regulators, and grid operators to overcome challenges associated with integrating variable renewable energy into the grid. This document introduces a brief overview of common technical impacts of PV on distribution systems and operations, as well as emerging strategies for successfully addressing some of the priority issues.

  20. A virtual reality interface for pre-planning of surgical operations based on a customized model of the patient

    Science.gov (United States)

    Witkowski, Marcin; Lenar, Janusz; Sitnik, Robert; Verdonschot, Nico

    2012-03-01

    We present a human-computer interface that enables the operator to plan a surgical procedure on the musculoskeletal (MS) model of the patient's lower limbs, send the modified model to the bio-mechanical analysis module, and export the scenario parameters to the surgical navigation system. The interface provides the operator with tools for: importing customized MS model of the patient, cutting bones and manipulating/removal of bony fragments, repositioning muscle insertion points, muscle removal and placing implants. After planning the operator exports the modified MS model for bio-mechanical analysis of the functional outcome. If the simulation result is satisfactory the exported scenario data may be directly used during the actual surgery. The advantages of the developed interface are the possibility of installing it in various hardware configurations and coherent operation regardless of the devices used. The hardware configurations proposed to be used with the interface are: (a) a standard computer keyboard and mouse, and a 2-D display, (b) a touch screen as a single device for both input and output, or (c) a 3-D display and a haptic device for natural manipulation of 3-D objects. The interface may be utilized in two main fields. Experienced surgeons may use it to simulate their intervention plans and prepare input data for a surgical navigation system while student or novice surgeons can use it for simulating results of their hypothetical procedure. The interface has been developed in the TLEMsafe project (www.tlemsafe.eu) funded by the European Commission FP7 program.

  1. Second Line of Defense Megaports Initiative Operational Testing and Evaluation Plan Colon Container Terminal (CCT) Panama

    Energy Technology Data Exchange (ETDEWEB)

    Newhouse, Robert N.

    2010-01-01

    Report on the Operational Testing and Evaluation to validate and baseline an operable system that meets the Second Line of Defense (SLD) mission requirements. An SLD system is defined as the detection technology and associated equipment, the system operators from the host country, the standard operating procedures (SOPs), and other elements such as training and maintenance which support long-term system sustainment. To this end, the activities conducted during the OT&E phase must demonstrate that the Megaports System can be operated effectively in real-time by Panama Direccion General de Aduanas (DGA Panama Customs) personnel to the standards of the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA).

  2. The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations

    Energy Technology Data Exchange (ETDEWEB)

    Kirby, Brendan J [ORNL

    2006-07-01

    Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second

  3. New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation, Operable Unit 1-07B

    Energy Technology Data Exchange (ETDEWEB)

    Nelson, L. O.

    2007-06-12

    This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

  4. Planning intensive care unit design using computer simulation modeling: optimizing integration of clinical, operational, and architectural requirements.

    Science.gov (United States)

    OʼHara, Susan

    2014-01-01

    Nurses have increasingly been regarded as critical members of the planning team as architects recognize their knowledge and value. But the nurses' role as knowledge experts can be expanded to leading efforts to integrate the clinical, operational, and architectural expertise through simulation modeling. Simulation modeling allows for the optimal merge of multifactorial data to understand the current state of the intensive care unit and predict future states. Nurses can champion the simulation modeling process and reap the benefits of a cost-effective way to test new designs, processes, staffing models, and future programming trends prior to implementation. Simulation modeling is an evidence-based planning approach, a standard, for integrating the sciences with real client data, to offer solutions for improving patient care.

  5. High Altitude Long Endurance Remotely Operated Aircraft - National Airspace System Integration - Simulation IPT: Detailed Airspace Operations Simulation Plan. Version 1.0

    Science.gov (United States)

    2004-01-01

    The primary goal of Access 5 is to allow safe, reliable and routine operations of High Altitude-Long Endurance Remotely Operated Aircraft (HALE ROAs) within the National Airspace System (NAS). Step 1 of Access 5 addresses the policies, procedures, technologies and implementation issues of introducing such operations into the NAS above pressure altitude 40,000 ft (Flight Level 400 or FL400). Routine HALE ROA activity within the NAS represents a potentially significant change to the tasks and concerns of NAS users, service providers and other stakeholders. Due to the complexity of the NAS, and the importance of maintaining current high levels of safety in the NAS, any significant changes must be thoroughly evaluated prior to implementation. The Access 5 community has been tasked with performing this detailed evaluation of routine HALE-ROA activities in the NAS, and providing to key NAS stakeholders a set of recommended policies and procedures to achieve this goal. Extensive simulation, in concert with a directed flight demonstration program are intended to provide the required supporting evidence that these recommendations are based on sound methods and offer a clear roadmap to achieving safe, reliable and routine HALE ROA operations in the NAS. Through coordination with NAS service providers and policy makers, and with significant input from HALE-ROA manufacturers, operators and pilots, this document presents the detailed simulation plan for Step 1 of Access 5. A brief background of the Access 5 project will be presented with focus on Steps 1 and 2, concerning HALE-ROA operations above FL400 and FL180 respectively. An overview of project management structure follows with particular emphasis on the role of the Simulation IPT and its relationships to other project entities. This discussion will include a description of work packages assigned to the Simulation IPT, and present the specific goals to be achieved for each simulation work package, along with the associated

  6. A heuristic approach for short-term operations planning in a catering company

    DEFF Research Database (Denmark)

    Farahani, Poorya; Grunow, Martin; Günther, H.O.

    2009-01-01

    Certain types of food such as catering foods decay very rapidly. This paper investigates how the quality of such foods can be improved by shortening the time interval between production and delivery. To this end, we develop an approach which integrates short-term production and distribution...... planning in a novel iterative scheme. The production scheduling problem is solved through an MILP modeling approach which is based on a block planning formulation complemented by a heuristic simplification procedure. Our investigation was motivated by a catering company located in Denmark. The production...... configuration and the processes assumed in our numerical experiments reflect real settings from this company. First numerical results are reported which demonstrate the applicability of the proposed approach....

  7. Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael J.

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  8. Evaluation of Conservation Voltage Reduction with Analytic Hierarchy Process: A Decision Support Framework in Grid Operations Planning

    Directory of Open Access Journals (Sweden)

    Kyungsung An

    2016-12-01

    Full Text Available This paper presents a systematic framework to evaluate the performance of conservation voltage reduction (CVR by determining suitable substations for CVR in operations planning. Existing CVR planning practice generally only focuses on the energy saving aspect without taking other underlying attributes into account, i.e., network topology and reduced voltage effects on other substations. To secure the desired operating reserve and avoid any adverse impacts, these attributes should be considered for implementing CVR more effectively. This research develops a practical decision-making framework based on the analytic hierarchy process (AHP to quantify several of the aforementioned attributes. Candidate substations for CVR deployment are prioritized such that performances are compared in terms of power transfer distribution factor (PTDF, voltage sensitivity factor (VSF, and CVR factor. In addition, to meet a specified reserve requirement, an integer programming approach is adopted to select potential substations for CVR implementations. Case studies for a Korean electric power system under diverse operating conditions are performed to demonstrate the effectiveness of the proposed method.

  9. METHOD OF PLANNING CONTROL AUTOMATED SYSTEM INTEGRITY IN THE OPERATION AND SUPPORT

    Directory of Open Access Journals (Sweden)

    Anton S. Lysunets

    2014-01-01

    Full Text Available The article describes the problems of monitoring the integrity of sophisticated banking systems in the accompaniment. The understanding of the level of integrity of the automated system is described using estimates of the integrity level of the planning methodology of testing the automated banking system. Results of the article would be used in courses on Software Engineering and Banking Systems Automation. 

  10. Plans and Combined Operations of the Flight Elements of the Europa Jupiter System Mission (EJSM)

    Science.gov (United States)

    Erd, Christian; Clark, K.; Ejsm System Teams

    2010-05-01

    The Europa Jupiter System Mission (EJSM) is a joint NASA-ESA mission candidate, where ESA would provide the Jupiter Ganymede Orbiter (JGO) and NASA would provide the Jupiter Europa Orbiter (JEO). Both spacecraft are foreseen to be launched in 2020, allowing for a joint exploration of the Jovian system, and the Galilean moons. The planning of the development, implementation and combined science phase will be described in the poster.

  11. Integrated machine-scheduling and inventory planning of door manufacturing operations at OYAK Renault factory

    OpenAIRE

    Bozkaya, Nurcan

    2012-01-01

    Ankara : The Department of Industrial Engineering and the Graduate School of Engineering and Science of Bilkent University, 2012. Thesis (Master's) -- Bilkent University, 2012. Includes bibliographical references. A car passes through press, body shell, painting and assembly stages during its manufacturing process. Due to the increased competition among car manufacturers, they aim to continuously advance and improve their processes. In this study, we analyze planning operati...

  12. Pre-operational environmental monitoring plan for the Device Assembly Facility at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    Ferate, F.D.

    1995-01-01

    Nuclear explosives operations have been and may continue to be an important component of the DOE mission at the NTS. This mission has been to conduct the nation`s nuclear testing program in a safe, secure, and efficient manner while assuring full compliance with state and federal regulations, and DOE order`s and directives. These operations have generally included assembly, disassembly or modification, staging, transportation, and tesbng of nuclear explosive devices. They may also include maintenance, repair, retrofit, and surveillance. The Device Assembly Facility (DAF) was constructed to provide a dedicated facility in which to prepare nuclear explosives assemblies for their intended disposition. This facility will provide for combined operations (replacing two separate facilities) and incorporates state-of-the-art safety and security features while minimizing the risks of environmental impacts. The facility has been completed but not yet operated, so the impacts to be considered will b e based on normal operations and not on the impacts of construction activities. The impacts will arise from nuclear explosives operations that require the handling of high explosives in combination with special nuclear materials. Wastes from operation of the earlier device assembly facilities have included grams of epoxies, pints of solvents, and small quantities of waste explosives. These are hazardous (includes radioactive) wastes and are disposed of in accordance with state and federal regulations. Assuming similar operations at the DAF, non-hazardous (includes non-radioactive) solid waste would be transported to a permitted landfill. Waste explosives would be sent to the Area 11 Explosive Ordnance Disposal Unit. Other hazardous waste would be sent to the Area 5 Radioactive Waste.Management Site for shipment or burial.

  13. Utilisation of three-dimensional printed heart models for operative planning of complex congenital heart defects.

    Science.gov (United States)

    Olejník, Peter; Nosal, Matej; Havran, Tomas; Furdova, Adriana; Cizmar, Maros; Slabej, Michal; Thurzo, Andrej; Vitovic, Pavol; Klvac, Martin; Acel, Tibor; Masura, Jozef

    2017-01-01

    To evaluate the accuracy of the three-dimensional (3D) printing of cardiovascular structures. To explore whether utilisation of 3D printed heart replicas can improve surgical and catheter interventional planning in patients with complex congenital heart defects. Between December 2014 and November 2015 we fabricated eight cardiovascular models based on computed tomography data in patients with complex spatial anatomical relationships of cardiovascular structures. A Bland-Altman analysis was used to assess the accuracy of 3D printing by comparing dimension measurements at analogous anatomical locations between the printed models and digital imagery data, as well as between printed models and in vivo surgical findings. The contribution of 3D printed heart models for perioperative planning improvement was evaluated in the four most representative patients. Bland-Altman analysis confirmed the high accuracy of 3D cardiovascular printing. Each printed model offered an improved spatial anatomical orientation of cardiovascular structures. Current 3D printers can produce authentic copies of patients` cardiovascular systems from computed tomography data. The use of 3D printed models can facilitate surgical or catheter interventional procedures in patients with complex congenital heart defects due to better preoperative planning and intraoperative orientation.

  14. Use of Frequency Response Metrics to Assess the Planning and Operating Requirements for Reliable Integration of Variable Renewable Generation

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph H.; Undrill, John; Mackin, Peter; Daschmans, Ron; Williams, Ben; Haney, Brian; Hunt, Randall; Ellis, Jeff; Illian, Howard; Martinez, Carlos; O' Malley, Mark; Coughlin, Katie; LaCommare, Kristina Hamachi

    2010-12-20

    An interconnected electric power system is a complex system that must be operated within a safe frequency range in order to reliably maintain the instantaneous balance between generation and load. This is accomplished by ensuring that adequate resources are available to respond to expected and unexpected imbalances and restoring frequency to its scheduled value in order to ensure uninterrupted electric service to customers. Electrical systems must be flexible enough to reliably operate under a variety of"change" scenarios. System planners and operators must understand how other parts of the system change in response to the initial change, and need tools to manage such changes to ensure reliable operation within the scheduled frequency range. This report presents a systematic approach to identifying metrics that are useful for operating and planning a reliable system with increased amounts of variable renewable generation which builds on existing industry practices for frequency control after unexpected loss of a large amount of generation. The report introduces a set of metrics or tools for measuring the adequacy of frequency response within an interconnection. Based on the concept of the frequency nadir, these metrics take advantage of new information gathering and processing capabilities that system operators are developing for wide-area situational awareness. Primary frequency response is the leading metric that will be used by this report to assess the adequacy of primary frequency control reserves necessary to ensure reliable operation. It measures what is needed to arrest frequency decline (i.e., to establish frequency nadir) at a frequency higher than the highest set point for under-frequency load shedding within an interconnection. These metrics can be used to guide the reliable operation of an interconnection under changing circumstances.

  15. Generation Of Manufacturing Routing And Operations Using Structured Knowledge As Basis To Application Of Computer Aided In Process Planning

    Science.gov (United States)

    Oswaldo, Luiz Agostinho

    2011-01-01

    The development of computer aided resources in automation of generation of manufacturing routings and operations is being mainly accomplished through the search of similarities between existent ones, resulting standard process routings that are grouped by analysis of similarities between parts or routings. This article proposes the development of manufacturing routings and operations detailment using a methodology which steps will define the initial, intermediate and final operations, starting from the rough piece and going up to the final specifications, that must have binunivocal relationship with the part design specifications. Each step will use the so called rules of precedence to link and chain the routing operations. The rules of precedence order and prioritize the knowledge of various manufacturing processes, taking in account the theories of machining, forging, assembly, and heat treatments; also, utilizes the theories of accumulation of tolerances and process capabilities, between others. It is also reinforced the availability of manufacturing databases related to process tolerances, deviations of machine tool- cutting tool- fixturing devices—workpiece, and process capabilities. The statement and application of rules of precedence, linking and joining manufacturing concepts in a logical and structured way, and their application in the methodology steps will make viable the utilization of structured knowledge instead of tacit one currently available in the manufacturing engineering departments, in the generation of manufacturing routing and operations. Consequently, the development of Computer Aided in Process Planning will be facilitated, due to the structured knowledge applied with this methodology.

  16. Headquarters Task Group 8.5 Operation Plan 2-1-62 Operation Order 2-1-62, Effective ____1962 for Operation Dominic

    Science.gov (United States)

    1962-03-22

    from the ac t iva t ion and operation of ships required by the AEC sole ly a s platforms f o r diagnost ic in- strumentation and fo r which...of buildings, r t ruc tures , and long- Lived equip- mcnts (such a r power, sewerage , water l i n e r and plamta) which occur8 during the...consolidate and coordiaate radio-frequency requirements dth JTF-8 . 3 Crypt0 -Teletype Facilities. The crypto-teletype network being activated to

  17. Operationally efficient propulsion system study (OEPSS) data book. Volume 9; Preliminary Development Plan for an Integrated Booster Propulsion Module (BPM)

    Science.gov (United States)

    DiBlasi, Angelo G.

    1992-01-01

    A preliminary development plan for an integrated propulsion module (IPM) is described. The IPM, similar to the Space Transportation Main engine (STME) engine, is applicable to the Advanced Launch System (ALS) baseline vehicle. The same STME development program ground rules and time schedule were assumed for the IPM. However, the unique advantages of testing an integrated engine element, in terms of reduced number of hardware and number of system and reliability tests, compared to single standalone engine and MPTA, are highlighted. The potential ability of the IPM to meet the ALS program goals for robustness, operability and reliability is emphasized.

  18. Payload operations management of a planned European SL-Mission employing establishments of ESA and national agencies

    Science.gov (United States)

    Joensson, Rolf; Mueller, Karl L.

    1994-01-01

    Spacelab (SL)-missions with Payload Operations (P/L OPS) from Europe involve numerous space agencies, various ground infrastructure systems and national user organizations. An effective management structure must bring together different entities, facilities and people, but at the same time keep interfaces, costs and schedule under strict control. This paper outlines the management concept for P/L OPS of a planned European SL-mission. The proposal draws on the relevant experience in Europe, which was acquired via the ESA/NASA mission SL-1, by the execution of two German SL-missions and by the involvement in, or the support of, several NASA-missions.

  19. Operation And Plans On The Accelerator Complex In Kurchatov Center Of Synchrotron Radiation

    CERN Document Server

    Korchuganov, V; Kovalchuk, M; Krylov, Yu; Kvardakov, V A; Moseiko, L; Moseiko, N; Novikov, V; Odintsov, D; Rezvov, V; Ushkov, V; Valentinov, A; Vernov, A; Yudin, L; Yupinov, Yu; Zheludeva, S I

    2004-01-01

    Kurchatov Synchrotron Radiation Source began the work as a first dedicated synchrotron radiation facility in Russia in 1999. The accelerator complex includes 80 MeV linac accelerator as an injector and two storage rings: 450 MeV SIBERIA-1 and 2.5 GeV SIBERIA-2, which are used for the experiments in the range of SR from VUV up to hard X-ray. Large progress was achieved in increasing SIBERIA-2 stored current during last year. The SR dose is rising fast and the lifetime is also grown. The report describes the current work and the plans on the accelerator facilities development.

  20. Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-09

    This report describes environmental monitoring activities at Hanford Reservation. Attention is focused on effluent monitoring and environmental surveillance. All Hanford contractors reviewed potential sources of contamination. A facility effluent monitoring plan was written for each facility with the potential to release significant quantities of hazardous materials, addressing both radiological and nonradiological effluent monitoring. The environmental surveillance program assesses onsite and offsite environmental impacts and offsite human health exposures. The program monitors air, surface water, sediment, agricultural products, vegetation, soil, and wildlife. In addition, independent onsite surveillance is conducted to evaluate the effectiveness of Hanford Site effluent controls in order to comply with applicable environmental standards and regulations.

  1. Essays on Strategy. Hostage Rescue Planning, Maritime Theater Nuclear Capability, Strategic Psychological Operations

    Science.gov (United States)

    1985-01-01

    lation.ý Only the Carter adminit rat ions, top-level personnel were awrare’ Ot the mission, tol inCILude the %’I(e President AMon- dLe,1) Secretary of D... principal actors with roles to play in persuasive com- munications. The USIA, the National Security Council (NSC), the Department of State, the Department...11ri V At t iirs Amrong its, principal responsibi lit ies are diplomiat i and tel h nical planning related to Mo dernizat ion (it US international

  2. Contribution to the operating energy planning of hydrothermal power systems; Contribuicao ao planejamento da operacao energetica de sistemas hidrotermicos de potencia

    Energy Technology Data Exchange (ETDEWEB)

    Carneiro, Adriano Alber de Franca Mendes

    1991-08-01

    This work treats of the problem of the planning of the energy operation of hydrothermal power systems, gone back to those with predominance of hydraulic generation, as it is the case of the Brazilian system. The work makes an analysis of the problem of the planning of the energy operation of systems hydrothermal leaving of the concepts and nature of this problem. Their inherent difficulties are shown and they come the main approaches in operation in countries with predominance of hydroelectric generation. It still introduces the methodology in energy planning in Brazil being pointed their main limitations. Finally an alternative model for the planning of the energy operation of the system brazilian hydrothermal, based on the made studies is also presented.

  3. Facility Operations 1993 fiscal year work plan: WBS 1.3.1

    Energy Technology Data Exchange (ETDEWEB)

    1992-11-01

    The Facility Operations program is responsible for the safe, secure, and environmentally sound management of several former defense nuclear production facilities, and for the nuclear materials in those facilities. As the mission for Facility Operations plants has shifted from production to support of environmental restoration, each plant is making a transition to support the new mission. The facilities include: K Basins (N Reactor fuel storage); N Reactor; Plutonium-Uranium Reduction Extraction (PUREX) Plant; Uranium Oxide (UO{sub 3}) Plant; 300 Area Fuels Supply (N Reactor fuel supply); Plutonium Finishing Plant (PFP).

  4. Performance of the ATLAS Liquid Argon Calorimeter after three years of LHC operation and plans for a future upgrade

    CERN Document Server

    Nikiforou, Nikiforos

    2013-01-01

    The ATLAS experiment is designed to study the proton-proton collisions produced at the Large Hadron Collider (LHC) at CERN. Liquid argon sampling calorimeters are used for all electromagnetic calorimetry as well as hadronic calorimetry in the endcaps. After installation in 2004--2006, the calorimeters were extensively commissioned over the three--year period prior to first collisions in 2009, using cosmic rays and single LHC beams. Since then, approximately 27~fb$\\mathbf{^{-1}}$ of data have been collected at an unprecedented center of mass energy. During all these stages, the calorimeter and its electronics have been operating almost optimally, with a performance very close to specifications. This paper covers all aspects of these first years of operation. The excellent performance achieved is especially presented in the context of the discovery of the elusive Higgs boson. The future plans to preserve this performance until the end of the LHC program are also presented.

  5. In-Situ Operations and Planning for the Mars Science Laboratory Robotic Arm: The First 200 Sols

    Science.gov (United States)

    Robinson, M.; Collins, C.; Leger, P.; Carsten, J.; Tompkins, V.; Hartman, F.; Yen, J.

    2013-01-01

    The Robotic Arm (RA) has operated for more than 200 Martian solar days (or sols) since the Mars Science Laboratory rover touched down in Gale Crater on August 5, 2012. During the first seven months on Mars the robotic arm has performed multiple contact science sols including the positioning of the Alpha Particle X-Ray Spectrometer (APXS) and/or Mars Hand Lens Imager (MAHLI) with respect to rocks or loose regolith targets. The RA has supported sample acquisition using both the scoop and drill, sample processing with CHIMRA (Collection and Handling for In- Situ Martian Rock Analysis), and delivery of sample portions to the observation tray, and the SAM (Sample Analysis at Mars) and CHEMIN (Chemistry and Mineralogy) science instruments. This paper describes the planning and execution of robotic arm activities during surface operations, and reviews robotic arm performance results from Mars to date.

  6. Comparison of 3D reconstruction of mandible for pre-operative planning using commercial and open-source software

    Science.gov (United States)

    Abdullah, Johari Yap; Omar, Marzuki; Pritam, Helmi Mohd Hadi; Husein, Adam; Rajion, Zainul Ahmad

    2016-12-01

    3D printing of mandible is important for pre-operative planning, diagnostic purposes, as well as for education and training. Currently, the processing of CT data is routinely performed with commercial software which increases the cost of operation and patient management for a small clinical setting. Usage of open-source software as an alternative to commercial software for 3D reconstruction of the mandible from CT data is scarce. The aim of this study is to compare two methods of 3D reconstruction of the mandible using commercial Materialise Mimics software and open-source Medical Imaging Interaction Toolkit (MITK) software. Head CT images with a slice thickness of 1 mm and a matrix of 512x512 pixels each were retrieved from the server located at the Radiology Department of Hospital Universiti Sains Malaysia. The CT data were analysed and the 3D models of mandible were reconstructed using both commercial Materialise Mimics and open-source MITK software. Both virtual 3D models were saved in STL format and exported to 3matic and MeshLab software for morphometric and image analyses. Both models were compared using Wilcoxon Signed Rank Test and Hausdorff Distance. No significant differences were obtained between the 3D models of the mandible produced using Mimics and MITK software. The 3D model of the mandible produced using MITK open-source software is comparable to the commercial MIMICS software. Therefore, open-source software could be used in clinical setting for pre-operative planning to minimise the operational cost.

  7. Impact of climate change on operations and planning of Hydro-Quebec's generation system

    Energy Technology Data Exchange (ETDEWEB)

    Raymond, M.P.; Houle, B.; Robert, S. [Hydro-Quebec, Montreal, PQ (Canada)

    2008-07-01

    Hydraulic resources currently account for more than 95 per cent of Hydro-Quebec's generation capacity. Hydro-Quebec also plans to purchase more wind power in the future. However, the utility wind and hydroelectric resources will be affected by climatic change in the future. This paper outlined research needed by hydroelectric and water resource managers in order to accurately determine the impacts of climatic change. Parameters included changes in annual and seasonal distribution as well as changes in the variability of natural inflows. The research will be used to determine the configuration of new projects as well as the refurbishment and replacement of existing infrastructure. Load profiles for the future indicate that electricity use will change, with less heating needed in winter, and more air conditioning required in summer months. The Delta method was used to determine impacts of future inflows and hydrological regimes. A case study of climate change impacts and management strategies for the Outardes River system up to the year 2050 was presented. The study showed that higher inflows are expected to produce more energy. Maintenance planning and flood control techniques were also discussed. The study showed that the effects of climate change on each of Hydro-Quebec's systems is expected to follow a similar pattern to the Outardes system. tabs., figs.

  8. 36 CFR 228.4 - Plan of operations-notice of intent-requirements.

    Science.gov (United States)

    2010-07-01

    ...), resulting in varying degrees of disturbance to vegetative resources, soil, water, air, or wildlife. The... from any person proposing to conduct operations which might cause significant disturbance of surface... cause significant surface resource disturbance and will not involve removal of more than a...

  9. Wind turbine blade life-time assessment model for preventive planning of operation and maintenance

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2014-01-01

    Out of the total wind turbine failure events, blade damage accounts for a substantial part, with some studies estimating it at around 23%. Current operation and maintenance (O&M) practices typically make use of corrective type maintenance as the basic approach, implying high costs for repair...

  10. Wind Turbine Blade Life-Time Assessment Model for Preventive Planning of Operation and Maintenance

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2015-01-01

    Out of the total wind turbine failure events, blade damage accounts for a substantial part, with some studies estimating it at around 23%. Current operation and maintenance (O&M) practices typically make use of corrective type maintenance as the basic approach, implying high costs for repair...

  11. Target motion predictions for pre-operative planning during needle-based interventions

    NARCIS (Netherlands)

    Buijs, op den Jorn; Abayazid, Momen; Korte, de Chris L.; Misra, Sarthak

    2011-01-01

    During biopsies, breast tissue is subjected to displacement upon needle indentation, puncture, and penetration. Thus, accurate needle placement requires pre-operative predictions of the target motions. In this paper, we used ultrasound elastography measurements to non-invasively predict elastic prop

  12. The Cords Pacification Program: An Operational Level Campaign Plan in Low Intensity Conflict

    Science.gov (United States)

    1989-05-05

    Name of Student: Richard J. Macak, MAJ, United States Marine Corps Title of Monograph: Civil Operations, Revolutionary Development Suppc"t ( COPDS ): An...failure in the long rcn because the "dedicated Communist cadre gave the enemy nis staying power, his ability to adapt to new conditions, to regenerate his

  13. Frequency analysis for planned islanding operation in the Danish distribution system - Bornholm

    DEFF Research Database (Denmark)

    Chen, Yu; Xu, Zhao; Østergaard, Jacob

    2008-01-01

    The power system in the Danish island Bornholm is a distribution system with a high penetration of wind generation, which is representative for expected future power systems. During the period from 11th to 14th September 2007, the Distribution System Operator (DSO) Ostkraft in Bornholm conducted ...

  14. Optimizing public transport planning and operations using automatic vehicle location data: The Dutch example

    NARCIS (Netherlands)

    Van Oort, N.; Sparing, D.; Brands, T.; Goverde, R.M.P.

    2012-01-01

    There is a growing pressure on urban public transport companies and authorities to improve efficiency, stemming from reduced budgets, political expectations and competition between operators. In order to find inefficiencies, bottlenecks and potentials in the public transport service, it is useful to

  15. Integrating truck arrival management into tactical operation planning at container terminals

    DEFF Research Database (Denmark)

    Yang, Zhong-Zhen; Chen, Gang; Song, Dong-Ping

    2013-01-01

    Truck arrival management (TAM) has been recognized as an effective solution to alleviate the gate congestion at container terminals. To further utilize TAM in improving the overall terminal performance, this study integrates TAM with the other terminal operations at a tactical level. An integrated...

  16. Design of a wildlife avoidance planning system for autonomous harvesting operations

    DEFF Research Database (Denmark)

    Bochtis, Dionysis D.; Grøn Sørensen, Claus; Green, Ole

    2014-01-01

    actions or field area coverage strategies. Nevertheless, these are general rules limited to simple-shaped fields, and which are not applicable to more complex operational situations. The objectives of the present study were to design a system capable of deriving a wildlife avoidance driving pattern...

  17. Second Line of Defense, Megaports Initiative, Operational Testing and Evaluation Plan, Port of Lazaro Cardenas, Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Hughes, Jamie D.

    2012-05-30

    The purpose of the Operational Testing and Evaluation (OT&E) phases of the project is to prepare for turnover of the Megaports System supplied by U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA)—located at the Export Lanes of the Port of Lazaro Cardenas, Mexico—to the Government of Mexico (GOM).

  18. 78 FR 19602 - Approval and Promulgation of Implementation Plans and Operating Permits Program; State of Missouri

    Science.gov (United States)

    2013-04-02

    ... the operating permits program. Next, definitions in 40 CSR 10-6.020(c) for Category I nonfriable... references in 10 CSR 10-6.020 Definitions and Common Reference Tables (2)(C)3 and (2)(C)4 dated November 30... revision can be found in Table 1, subsection (3)(A) of 10 CSR 10-6.020 Definitions and Common...

  19. Tank 241-AZ-101 and Tank 241-AZ-102 Airlift Circulator Operation Vapor Sampling and Analysis Plan

    Energy Technology Data Exchange (ETDEWEB)

    TEMPLETON, A.M.

    1999-12-07

    This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples obtained during the operation of the tank 241-AZ-101 and 241-AZ-102 airlift circulators (ALCs) and during the initial operation (''bump'') of the tank 241-AZ-101 mixer pumps. The purpose of the ALC operation is to support portions of the operational test procedure (OTP) for Project W-030 (OTP-W030-001) and to perform functional test in support of Project W-151. Project W-030 is the 241-A-702 ventilation upgrade project (241-142-702) and Project W-151 is the 241-AZ-101 Mixer Pump Test. The functional tests will check the operability of the tank 241-AZ-101 ALCs. Process Memo's No. 2E98-082 and No. 2E99-001 (LMHC 1999a, LMHC 1999b) direct the operation of the ALCs and the Industrial Hygiene monitoring respectively. A series of tests will be conducted in which the ALCs in tanks 241-AZ-101 and 241-AZ-102 will be operated at different air flow rates. Vapor samples will be obtained to determine constituents that may be present in the tank headspace during ALC operation at tanks 241-AZ-101 and 241-AZ-102 as the waste is disturbed. During the testing, vapor samples will be obtained from the headspace of tanks 241-AZ-101 and 241-AZ-102 via the unused port on the standard hydrogen monitoring system (SHMS). In addition the last two vapor samples will be collected from the headspace of tank 241-AZ-101 during the operation of the mixer pumps. Each mixer pump will be operated for approximately 5 minutes. Results will be used to provide the waste feed delivery program with environmental air permitting data for tank waste disturbing activities. Because of radiological concerns, the samples will be filtered for particulates. It is recognized that this may remove some organic compounds. The following sections provide the general methodology and procedures to be used in the

  20. Second Line of Defense Megaports Initiative Operational Testing and Evaluation Plan - Kingston Container Terminal, Port of Kingston, Jamaica

    Energy Technology Data Exchange (ETDEWEB)

    Deforest, Thomas J.; VanDyke, Damon S.

    2012-03-01

    Operational Testing and Evaluation Plan - Kingston Container Terminal, Port of Kingston, Jamaica was written for the Second Line of Defense Megaports Initiative. The purpose of the Operational Testing and Evaluation (OT&E) phase of the project is to prepare for turnover of the Megaports system supplied by U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) located at the Kingston Container Terminal (KCT) of the Port of Kingston, Jamaica to the Government of Jamaica (GOJ). Activities conducted during the OT&E phase must demonstrate that the Megaports system can be operated effectively in real time by Jamaica Customs and KCT personnel to the satisfaction of the DOE/NNSA. These activities will also determine if the Megaports system, as installed and accepted, is performing according to the Megaports Program objectives such that the system is capable of executing the mission of the Second Line of Defense Megaports Initiative. The OT&E phase of the project also provides an opportunity to consider potential improvements to the system and to take remedial action if performance deficiencies are identified during the course of evaluation. Changes to the system should be considered under an appropriate change-control process. DOE/NNSA will determine that OT&E is complete by examining whether the Megaports system is performing as intended and that the GOJ is fully capable of operating the system independently without continued onsite support from the U.S. team.

  1. Waste management plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The Lower East Fork Poplar Creek (LEFPC) Remedial Action project will remove mercury-contaminated soils from the floodplain of LEFPC, dispose of these soils at the Y-12 Plant Landfill V, and restore the affected floodplain. The waste management plan addresses management and disposition of all wastes generated during the LEFPC remedial action. Most of the solid wastes will be sanitary or construction/demolition wastes and will be disposed of at existing Y- 12 facilities. Some small amounts of hazardous waste are anticipated, along with possible low-level or mixed wastes (> 35 pCi/g). Liquid wastes will be generated which will be sanitary and capable of being disposed of at the Oak Ridge Sewage Treatment Plant, except sanitary sewage.

  2. IT运维管理解决方案%IT Operation-Matainance Solution Plan

    Institute of Scientific and Technical Information of China (English)

    侯毅; 孙波

    2011-01-01

    随着银行业务管理和客户服务的需求的不断增加,IT系统运维管理至关重要。本文从业务感知角度出发,以业务拓扑模型为核心,依据业务建模、数据聚集、告警管控和界面展示四个层次来实现IT运营监控系统的管理。%As business management and customer service's demand of Bank industry increases continually,IT operation-maintenance management is the most important.From the point of business sense,on the essence of business development model,the thesis actualize the management to IT operation and monitoring control by 4 levels,Business Building Model,Data Integration,Alarm Controlling and interface demonstration.

  3. Optimal dimensioning of low-energy district heating networks with operational planning

    DEFF Research Database (Denmark)

    Tol, Hakan; Svendsen, Svend

    2012-01-01

    Low-temperature operation in low-energy District Heating (DH) systems is rewarding for increased exploitation of low-temperature renewable energy sources, heightened efficiency at heat extraction, and intensified energy efficiency at heat distribution. Success of heat delivery in low......-temperature operation such as 55 °C in terms of supply and 25 °C in terms of return was achieved through real cases located at Lystrup in Denmark, and “Greenwatt Way” project located at Scotland in UK as demonstration of low-energy DH systems being considered to supply heat to new houses with low-energy class. In our...... former study the performance of in-house heating systems was investigated for changing levels of supply temperature with consideration given both to current high-heat demand and future low-heat demand value of an existing settlement. The over-dimensions obtained at in-house heating systems originally...

  4. Assessment, Planning, and Execution Considerations for Conjunction Risk Assessment and Mitigation Operations

    Science.gov (United States)

    Frigm, Ryan C.; Levi, Joshua A.; Mantziaras, Dimitrios C.

    2010-01-01

    An operational Conjunction Assessment Risk Analysis (CARA) concept is the real-time process of assessing risk posed by close approaches and reacting to those risks if necessary. The most effective way to completely mitigate conjunction risk is to perform an avoidance maneuver. The NASA Goddard Space Flight Center has implemented a routine CARA process since 2005. Over this period, considerable experience has been gained and many lessons have been learned. This paper identifies and presents these experiences as general concepts in the description of the Conjunction Assessment, Flight Dynamics, and Flight Operations methodologies and processes. These general concepts will be tied together and will be exemplified through a case study of an actual high risk conjunction event for the Aura mission.

  5. Refractory Metal Heat Pipe Life Test - Test Plan and Standard Operating Procedures

    Science.gov (United States)

    Martin, J. J.; Reid, R. S.

    2010-01-01

    Refractory metal heat pipes developed during this project shall be subjected to various operating conditions to evaluate life-limiting corrosion factors. To accomplish this objective, various parameters shall be investigated, including the effect of temperature and mass fluence on long-term corrosion rate. The test series will begin with a performance test of one module to evaluate its performance and to establish the temperature and power settings for the remaining modules. The performance test will be followed by round-the-clock testing of 16 heat pipes. All heat pipes shall be nondestructively inspected at 6-month intervals. At longer intervals, specific modules will be destructively evaluated. Both the nondestructive and destructive evaluations shall be coordinated with Los Alamos National Laboratory. During the processing, setup, and testing of the heat pipes, standard operating procedures shall be developed. Initial procedures are listed here and, as hardware is developed, will be updated, incorporating findings and lessons learned.

  6. Simulation model of discret events applied to the planning and operation of a toll plaza

    OpenAIRE

    2016-01-01

    AbstractThis work investigates the congestion and traffic flow in a tool plaza, and proposes a methodology for the classification of highway flows and its service levels based on a combination of the Highway Capacity Manual – HCM and Discrete Events Simulation fundaments. The proposed mesoscopic simulation is used to analyze service levels of different physical and operational arrangements of a particular toll gate. The model considers speed functions, toll gate arrivals and departures,...

  7. Discrete Sampling Test Plan for the 200-BP-5 Operable Unit

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, Mark D.

    2010-02-04

    The Discrete Groundwater Sampling Project is conducted by the Pacific Northwest National Laboratory (PNNL) on behalf of CH2M HILL Plateau Remediation Company. The project is focused on delivering groundwater samples from proscribed horizons within select groundwater wells residing in the 200-BP-5 Operable Unit (200-BP-5 OU) on the Hanford Site. This document provides the scope, schedule, methodology, and other details of the PNNL discrete sampling effort.

  8. Border Jumping: Strategic and Operational Considerations in Planning Cross-Border Raids Against Insurgent Sanctuaries

    Science.gov (United States)

    2013-06-01

    military and cultural influence. Within month, the agreements rang hollow, as both nations lent support to the FLN.107 The French capture of Ben...Africa in Namibia, 56. 142 Truth and Reconciliation Commission, South Africa Report, 45. Kelly Bell, “Operation Savannah: Task Force Zulu and the...focused cross-border raids. Indigenous intelligence networks can also help preserve tactical forces by sharing cultural information that can affect the

  9. Business Plan for Launching a Luxury Adventure Tour Operator Based in Canada

    OpenAIRE

    Hung, Greg; Khlystov, Nikolai

    2011-01-01

    MOT Elite Travel Experiences (METE) is a tour operator and online travel agent start-up company based in Vancouver, British Columbia. METE is faced with the challenge of establishing itself as a business in the travel industry. However, recent advances in technology such as an increase in the number of broadband Internet users, search engine optimization, and the advent of smartphones have created an opportunity to capitalize on the growing popularity of online travel booking services. This t...

  10. Current and Planned High Proton Flux Operations at the FNAL Booster

    CERN Document Server

    Garcia, F G

    2014-01-01

    The Fermilab Proton Source machines, constituted by Pre-Injector, conventional Linac and Booster synchrotron, at Fermi National Accelerator Laboratory (Fermilab) had have a long history of successful beam operations. Built in late '60s, the Fermilab Proton Source began operations early in the '70s and since then it has successful provided protons to support the laboratory physics experiments. During the past decade, Booster performance reached unprecedented proton flux delivery of the order of 1.0-1.1E17 protons per hour, corresponding to 40 kW of beam power while maintained an allowed upper limit of 525 W of beam loss in the tunnel. In order to achieve this historical performance, major hardware upgrades were made in the machine combined with improvements in beam orbit control and operational awareness. Once again, the Proton Source has been charged to double their beam throughput, while maintaining the present residual activation levels, to meet the laboratory Intensity Frontier program goals until new mach...

  11. MHG bioenergy ERP - enterprise resource planning service entity for bioenergy operators

    Energy Technology Data Exchange (ETDEWEB)

    Huurinainen, S. (MHG Systems Oy Ltd, Mikkeli (Finland)), Email: seppo.huurinainen@mhgsystems.com

    2009-07-01

    MHG Systems provides ERP systems specifically geared for the bioenergy and energy field. MHG ERP synthesizes mobile communications, the Internet, real-time maps, and satellite-based location information into one business-enhancing service and allows the use of new and especially contract-based and empowering operational models. The company's services bring significant cost savings to all operators in the bioheat, bioelectricity, and biofuel production chain. The MHG platform service allows development of new, empowering operational models resulting in paperfree office and field work. Customer solutions are created from MHG ERP's building blocks and delivered as turnkey solutions - or the service can be used an ASP basis. MHG customer solutions are created from MHG ERP's independent building blocks and delivered as turnkey solutions, or the service can be used on an ASP basis. MHG-ERP-based customer solutions can be used practically anywhere in the world, since they can be set to utilize national raster maps. professional vector-based Google Maps products, or remote sensing maps and are used via a Web browser or online or offline mobile devices such as smartphones, automatic navigators, PDAs, Toughbooks, and PCs. The superior features of the MGH Bioenergy ERP service include transparency throughout the delivery chain, management of the moisture content of bioenergy masses, reporting features focused on the amount of energy (i.e., the number of megawatt hours), and accounts and invoicing. (orig.)

  12. Registration-free laparoscope augmentation for intra-operative liver resection planning

    Science.gov (United States)

    Feuerstein, Marco; Mussack, Thomas; Heining, Sandro M.; Navab, Nassir

    2007-03-01

    In recent years, an increasing number of liver tumor indications were treated by minimally invasive laparoscopic resection. Besides the restricted view, a major issue in laparoscopic liver resection is the enhanced visualization of (hidden) vessels, which supply the tumorous liver segment and thus need to be divided prior to the resection. To navigate the surgeon to these vessels, pre-operative abdominal imaging data can hardly be used due to intraoperative organ deformations mainly caused by appliance of carbon dioxide pneumoperitoneum and respiratory motion. While regular respiratory motion can be gated and synchronized intra-operatively, motion caused by pneumoperitoneum is individual for every patient and difficult to estimate. Therefore, we propose to use an optically tracked mobile C-arm providing cone-beam CT imaging capability intraoperatively. The C-arm is able to visualize soft tissue by means of its new flat panel detector and is calibrated offline to relate its current position and orientation to the coordinate system of a reconstructed volume. Also the laparoscope is optically tracked and calibrated offline, so both laparoscope and C-arm are registered in the same tracking coordinate system. Intra-operatively, after patient positioning, port placement, and carbon dioxide insufflation, the liver vessels are contrasted and scanned during patient exhalation. Immediately, a three-dimensional volume is reconstructed. Without any further need for patient registration, the volume can be directly augmented on the live laparoscope video, visualizing the contrasted vessels. This augmentation provides the surgeon with advanced visual aid for the localization of veins, arteries, and bile ducts to be divided or sealed.

  13. A Critical Examination of Planning Imperatives Applicable to Hostage Rescue Operations

    Science.gov (United States)

    1984-04-16

    referred to as the "Stockholm Syndrome ," after a Swedish bank robbery incident in 1973 where the hostages began to identify with the bank robbers and...1976, pp. 397-401. Oasit, Shlomo. "Risk, Glory and the Rescue Operation." InternationaI Security. Vol 6, No. 1, Sumner 1981, pp. 111-135. 47 "Group...Conference of May 16." Department of State Bulletin" Vol. 62, No. 1875, 2 June 1975, pp. 719-722. Lapham, Lewis H. "The Somnambulists." Harer’s. Vol. 261, No

  14. Operable Unit 7-13/14 in situ thermal desorption treatability study work plan

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, P.; Nickelson, D.; Hyde, R.

    1999-05-01

    This Work Plan provides technical details for conducting a treatability study that will evaluate the application of in situ thermal desorption (ISTD) to landfill waste at the Subsurface Disposal Area (SDA) at the Idaho National Engineering and Environmental Laboratory (INEEL). ISTD is a form of thermally enhanced vapor vacuum extraction that heats contaminated soil and waste underground to raise its temperature and thereby vaporize and destroy most organics. An aboveground vapor vacuum collection and treatment system then destroys or absorbs the remaining organics and vents carbon dioxide and water to the atmosphere. The technology is a byproduct of an advanced oil-well thermal extraction program. The purpose of the ISTD treatability study is to fill performance-based data gaps relative to off-gas system performance, administrative feasibility, effects of the treatment on radioactive contaminants, worker safety during mobilization and demobilization, and effects of landfill type waste on the process (time to remediate, subsidence potential, underground fires, etc.). By performing this treatability study, uncertainties associated with ISTD as a selected remedy will be reduced, providing a better foundation of remedial recommendations and ultimate selection of remedial actions for the SDA.

  15. Overview of the LADEE Ultraviolet-visible Spectrometer: Design, Performance and Planned Operations

    Science.gov (United States)

    Colaprete, A.; Elphic, R. C.; Landis, D.; Karcz, J.; Osetinsky, L.; Shirley, M.; Vargo, K.; Wooden, D.

    2013-01-01

    The Lunar Atmosphere and Dust Environment Explorer (LADEE) is an orbital lunar science mission currently under development to address the goals of the 2003 National Research Council decadal survey, the Lunar Exploration Analysis Group Roadmap, and the "Scientific Context for Exploration of the Moon" (SCEM) report, and has been recommended for execution by the 2011 Planetary Missions Decadal Survey. The mission s focus is to study the pristine state of the lunar atmosphere and dust environment prior to possible lunar exploration activities by countries, including the United States, China, India, and Japan, among others. Activity on the lunar surface has the potential of altering the tenuous lunar atmosphere, but changing the type and concentration of gases in the atmosphere. Before these activities occur it is important to make measurements of the current lunar atmosphere in its unmodified state. LADEE will determine the composition of the lunar atmosphere and investigate the processes that control its distribution and variability, including sources, sinks, and surface interactions. It will monitor variations in known gases, such as sodium, potassium, argon and helium, and will search for other, as-yet-undetected gases of both lunar and extra-lunar origin. LADEE will also determine whether dust is present in the lunar exosphere, and reveal the processes that contribute to its sources and variability. Launch is planned for August, 2013.

  16. On the dynamics of a wind-hydrogen energy system undergoing a suitable operation planning

    Energy Technology Data Exchange (ETDEWEB)

    Garcia Clua, J.G. [National University of La Plata, Buenos Aires (Argentina). Faculty of Engineering. Lab. de Electronica Industrial, Control e Instrumentacion (LEICI)]. E-mail: jose.garciaclua@ing.unlp.edu.ar; Mantz, R.J. [National University of La Plata, Buenos Aires (Argentina). Scientific Research Commission of the Province of Buenos Aires (CICpBA); Battista, H. de [Consejo Nacional de Investigaciones Cientificas y Tecnicas - CONICET, Buenos Aires (Argentina)

    2008-07-01

    Hydrogen production from renewable energy sources represents a potential solution for sustainable development. However, there are still some barriers to a cost-competitive hydrogen economy. Among other open topics, there is a need for suitable controllers being capable of maximizing the wind energy extraction despite the primary resource variability and, at the same time, of accomplishing the electrolyzer specifications. Several operation strategies have been proposed to cope with these objectives. Nevertheless, the design of dynamic controllers to track a given strategy is a problem less treated in literature, though not less important. For the proper design of such controllers it is necessary to study the inherent properties of the system dynamics. In this context, this paper is devoted to investigate the dynamic behaviour of a wind-hydrogen energy system where the wind turbine is coupled to the electrolyzer through an electronic converter. Particular attention is given to the zero dynamics of the system because of their potential limitations to the operation strategy tracking. It is found that the zero dynamics exhibits interesting phenomena such as bifurcation of equilibria, which mainly appears because of the nonlinearity introduced by the aerodynamic torque. (author)

  17. Design of a Wildlife Avoidance Planning System for Autonomous Harvesting Operations

    Directory of Open Access Journals (Sweden)

    Dionysis D. Bochtis

    2014-01-01

    Full Text Available Harvesting and mowing operations are among the main potential stressors affecting wildlife within agricultural landscapes, leading to large animal losses. A number of studies have been conducted on harvesting practices to address the problem of wildlife mortality, providing a number of management actions or field area coverage strategies. Nevertheless, these are general rules limited to simple-shaped fields, and which are not applicable to more complex operational situations. The objectives of the present study were to design a system capable of deriving a wildlife avoidance driving pattern for any field shape complexity and field boundary conditions (in terms of escape and non-escape areas and applicable to different animal behaviours. The assumed animal escape reactions are the result of the parameterization of a series of developed behavioural functions. This parameterization will be able to adapt any knowledge that is or might become available as a result of dedicated future experiments on animal behaviour for different species or different animal ages.

  18. An environment for operation planning of electrical energy distribution systems; Um ambiente para planejamento da operacao de sistemas de distribuicao de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Hashimoto, Kleber

    1997-07-01

    The aim of operation planning of electrical energy distribution systems is to define a group of interventions in the distribution network in a way to reach a global optimization. Both normal operation and emergency conditions are considered including scheduled interventions in the network. Under normal conditions, some aspects as voltage drop and loss minimization, for example, are considered; under emergency conditions, the minimization of non-distributed energy and interruption time are taken into account. This proposes the development of a computer environment for operation planning studies. The design and implementation of a specific operation planning database, based on a relational database model, was carried out so that new information modules could be easily included. A statistical approach has been applied to the load model including consumption habits and seasonal information, for each consumer category. A group of operation planning functions is proposed, which includes simulation modules responsible for system analysis. These functions and the database should be designed together. The developed computer environment allows the inclusion of new functions, due to the standardized query language used to access the database. Two functions have been implemented for illustration. The development of the proposed environment constitutes a step towards an open operation planning system, an integration with other information systems and an easy-to-use system based on graphical interface. (author)

  19. OPERATION OF ENTERPRISE RESOURCE PLANNING SYSTEM IMPLEMENTATION COMPATIBILITY TOWARDS TECHNICAL ADVANCEMENT

    Directory of Open Access Journals (Sweden)

    J. Venkatesh

    2013-01-01

    Full Text Available The Execution of ERP systems has been perplexing factor for many firms. Many establishments have accepted that the operation of ERP system is a massive hindrance until the flow of process is organized carefully. As information technology is booming its prerequisite for organizations to realize the prominence of technical advancement and compatibility in work environment. A complete review was done to ascertain the features and strategic aids of ERP enactments using the retorts from 120 firms. The respondents were approached with orderly framed questionnaires, thereby giving them ample time to come out with their own thoughts. The effects of this learning provide assistance for the vendors, higher officials and ERP specialists to be more competent in handling the execution of ERP with their inadequate possessions there by augmenting the business. It acts a pathway for the concerns to realize their potent and extend their business platform.

  20. Oil spill impacts on mangroves: Recommendations for operational planning and action based on a global review.

    Science.gov (United States)

    Duke, Norman C

    2016-08-30

    Mangrove tidal wetland habitats are recognised as highly vulnerable to large and chronic oil spills. This review of current literature and public databases covers the last 6 decades, summarising global data on oil spill incidents affecting, or likely to have affected, mangrove habitat. Over this period, there have been at least 238 notable oil spills along mangrove shorelines worldwide. In total, at least 5.5milliontonnes of oil has been released into mangrove-lined, coastal waters, oiling possibly up to around 1.94millionha of mangrove habitat, and killing at least 126,000ha of mangrove vegetation since 1958. However, there were assessment limitations with incomplete and unavailable data, as well as unequal coverage across world regions. To redress the gaps described here in reporting on oil spill impacts on mangroves and their recovery worldwide, a number of recommendations and suggestions are made for refreshing and updating standard operational procedures for responders, managers and researchers alike.

  1. Virtual reality in planning and operations from research topic to practical issue

    Energy Technology Data Exchange (ETDEWEB)

    Rindahl, G.; Johnsen, T.; Mark, N. K. F.; Meyer, G. [OECD Halden Reactor Project, Inst. for Energy Technology, Os Alle 13, N-1751 Halden (Norway)

    2006-07-01

    During the last decade of research and development on advanced visualization systems for the nuclear industry, the available technology has evolved significantly. In the same period, nuclear companies have entered a more competitive environment due to the increasingly open electricity market, resulting in strong demands on cost effective operations. This paper reports on some of the 3D applications developed by Inst. for Energy Technology in this time period, and on the emerging possibilities for practical applications of Virtual and Augmented Reality. Finally the paper proposes that well-considered deployment of recent and on-going technological advances in this field can be a contribution to improving economy and efficiency without compromising safety. (authors)

  2. Processing of Mars Exploration Rover Imagery for Science and Operations Planning

    Science.gov (United States)

    Alexander, Douglass A.; Deen, Robert G.; Andres, Paul M.; Zamani, Payam; Mortensen, Helen B.; Chen, Amy C.; Cayanan, Michael K.; Hall, Jeffrey R.; Klochko, Vadim S.; Pariser, Oleg; Stanley, Carol L.; Thompson, Charles K.; Yagi, Gary M.

    2006-01-01

    The twin Mars Exploration Rovers (MER) delivered an unprecedented array of image sensors to the Mars surface. These cameras were essential for operations, science, and public engagement. The Multimission Image Processing Laboratory (MIPL) at the Jet Propulsion Laboratory was responsible for the first-order processing of all of the images returned by these cameras. This processing included reconstruction of the original images, systematic and ad hoc generation of a wide variety of products derived from those images, and delivery of the data to a variety of customers, within tight time constraints. A combination of automated and manual processes was developed to meet these requirements, with significant inheritance from prior missions. This paper describes the image products generated by MIPL for MER and the processes used to produce and deliver them.

  3. Interim directive ID 2001-5 : public safety and sour gas policy implementation recommendations 54, 60, and 61 : site-specific emergency response plans for sour gas operations, emergency planning zones, and reduced planning zones

    Energy Technology Data Exchange (ETDEWEB)

    McCrank, N. [Alberta Energy and Utilities Board, Calgary, AB (Canada)

    2001-08-01

    A report of findings and recommendations was presented to the Alberta Energy and Utilities Board (EUB) in December 2000 by the Provincial Advisory Committee on Public Safety and Sour Gas (Advisory Committee). Emergency planning zones (EPZs) and emergency response plans (ERPs) for sour gas operations and how they translate into EUB practices and requirements are topics that were identified in the recommendations. A full review of current emergency preparedness requirements, including the methodology for the determination of EPZs, will be undertaken by the EUB to address these recommendations. The outcome of the update of information concerning health effects of hydrogen sulfide and sulphur dioxide, as well as the review of the current use of dispersion models and probabilistic risk assessment is expected to greatly affect the review on emergency preparedness. The comprehensive review of ERP requirements and determination of EPZs, including reduced EPZs, will take place upon completion of the updated health information, which is expected to take approximately 18 to 24 months. Effective immediately, this interim directive provides additional clarification on the administration of these existing requirements by the EUB, and the document includes new requirements to be used in the interim. This document was prepared in response to Recommendations 54, 60, and 61. It should be noted that the current emergency response planning and preparedness requirements in place remain valid until they are replaced or rescinded. 4 figs.

  4. A web-based remote radiation treatment planning system using the remote desktop function of a computer operating system: a preliminary report.

    Science.gov (United States)

    Suzuki, Keishiro; Hirasawa, Yukinori; Yaegashi, Yuji; Miyamoto, Hideki; Shirato, Hiroki

    2009-01-01

    We developed a web-based, remote radiation treatment planning system which allowed staff at an affiliated hospital to obtain support from a fully staffed central institution. Network security was based on a firewall and a virtual private network (VPN). Client computers were installed at a cancer centre, at a university hospital and at a staff home. We remotely operated the treatment planning computer using the Remote Desktop function built in to the Windows operating system. Except for the initial setup of the VPN router, no special knowledge was needed to operate the remote radiation treatment planning system. There was a time lag that seemed to depend on the volume of data traffic on the Internet, but it did not affect smooth operation. The initial cost and running cost of the system were reasonable.

  5. Field Sampling Plan for the Operable Units 6-05 and 10-04 Remedial Action, Phase IV

    Energy Technology Data Exchange (ETDEWEB)

    R. Wells

    2006-11-14

    This Field Sampling Plan outlines the collection and analysis of samples in support of Phase IV of the Waste Area Group 10, Operable Units 6-05 and 10-04 remedial action. Phase IV addresses the remedial actions to areas with the potential for unexploded ordnance at the Idaho National Laboratory Site. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. The remedial action consists of removal and disposal of ordnance by high-order detonation, followed by sampling to determine the extent, if any, of soil that might have been contaminated by the detonation activities associated with the disposal of ordnance during the Phase IV activities and explosives during the Phase II activities.

  6. Operations-Based Planning for Placement and Sizing of Energy Storage in a Grid With a High Penetration of Renewables

    CERN Document Server

    Dvijotham, Krishnamurthy; Backhaus, Scott

    2011-01-01

    As the penetration level of transmission-scale time-intermittent renewable generation resources increases, control of flexible resources will become important to mitigating the fluctuations due to these new renewable resources. Flexible resources may include new or existing synchronous generators as well as new energy storage devices. The addition of energy storage, if needed, should be done optimally to minimize the integration cost of renewable resources, however, optimal placement and sizing of energy storage is a difficult optimization problem. The fidelity of such results may be questionable because optimal planning procedures typically do not consider the effect of the time dynamics of operations and controls. Here, we use an optimal energy storage control algorithm to develop a heuristic procedure for energy storage placement and sizing. We generate many instances of intermittent generation time profiles and allow the control algorithm access to unlimited amounts of storage, both energy and power, at a...

  7. Verification Plan for the Concrete Temperature of the MACSTOR/KN-400 Module under Transient State Considering Actual Operating Conditions

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kyung Ho; Park, Jeong Eun [KHNP, Daejeon (Korea, Republic of)

    2009-10-15

    This paper covers a verification plan of the results of heat transfer analysis in the MACSTOR/KN-400 on a transient state basis. The transient state reflects several natural environment parameters such as solar loads and daily temperature variations. These factors seriously affect analysis results in terms of concrete temperature and temperature gradients. There are two objectives to verifying the heat analysis results under transient state. First, there is the need to meet the request of the regular body to confirm that concrete temperature stays below the level of the design criteria. Second, it is necessary to recognize how much conservative the analysis is. In actual operating conditions, concrete temperature would be reduced by less conservative conditions.

  8. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV

    Energy Technology Data Exchange (ETDEWEB)

    R. P. Wells

    2006-11-14

    This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

  9. High-resolution wave and hydrodynamics modelling in coastal areas: operational applications for coastal planning, decision support and assessment

    Science.gov (United States)

    Samaras, Achilleas G.; Gaeta, Maria Gabriella; Moreno Miquel, Adrià; Archetti, Renata

    2016-07-01

    Numerical modelling has become an essential component of today's coastal planning, decision support and risk assessment. High-resolution modelling offers an extensive range of capabilities regarding simulated conditions, works and practices and provides with a wide array of data regarding nearshore wave dynamics and hydrodynamics. In the present work, the open-source TELEMAC suite and the commercial software MIKE21 are applied to selected coastal areas of South Italy. Applications follow a scenario-based approach in order to study representative wave conditions in the coastal field; the models' results are intercompared in order to test both their performance and capabilities and are further evaluated on the basis of their operational use for coastal planning and design. A multiparametric approach for the rapid assessment of wave conditions in coastal areas is also presented and implemented in areas of the same region. The overall approach is deemed to provide useful insights on the tested models and the use of numerical models - in general - in the above context, especially considering that the design of harbours, coastal protection works and management practices in the coastal zone is based on scenario-based approaches as well.

  10. New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B

    Energy Technology Data Exchange (ETDEWEB)

    D. Vandel

    2003-09-01

    This remedial action work plan identifies the approach and requirements for implementing the medical zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Engineering and Environmental Laboratory (INEEL). This plan details management approach for the construction and operation of the New Pump and Treat Facility. As identified in the remedial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action. This work plan was originally prepared as an early implementation of the final Phase C remediation. At that time, The Phase C implementation strategy was to use this document as the overall Phase C Work Plan and was to be revised to include the remedial actions for the other remedial zones (hotspot and distal zones). After the completion of Record of Decision Amendment: Technical Support Facility Injection Well (TSF-05) and Surrounding Groundwater Contamination (TSF-23) and Miscellaneous No Action Sites, Final Remedial Action, it was determined that each remedial zone would have it own stand-alone remedial action work plan. Revision 1 of this document converts this document to a stand-alone remedial action plan specific to the implementation of the New Pump and Treat Facility used for plume remediation within the medical zone of the OU 1-07B contaminated plume.

  11. System Configuration and Operation Plan of Hayabusa2 DCAM3-D Camera System for Scientific Observation During SCI Impact Experiment

    Science.gov (United States)

    Ogawa, Kazunori; Shirai, Kei; Sawada, Hirotaka; Arakawa, Masahiko; Honda, Rie; Wada, Koji; Ishibashi, Ko; Iijima, Yu-ichi; Sakatani, Naoya; Nakazawa, Satoru; Hayakawa, Hajime

    2017-07-01

    An artificial impact experiment is scheduled for 2018-2019 in which an impactor will collide with asteroid 162137 Ryugu (1999 JU3) during the asteroid rendezvous phase of the Hayabusa2 spacecraft. The small carry-on impactor (SCI) will shoot a 2-kg projectile at 2 km/s to create a crater 1-10 m in diameter with an expected subsequent ejecta curtain of a 100-m scale on an ideal sandy surface. A miniaturized deployable camera (DCAM3) unit will separate from the spacecraft at about 1 km from impact, and simultaneously conduct optical observations of the experiment. We designed and developed a camera system (DCAM3-D) in the DCAM3, specialized for scientific observations of impact phenomenon, in order to clarify the subsurface structure, construct theories of impact applicable in a microgravity environment, and identify the impact point on the asteroid. The DCAM3-D system consists of a miniaturized camera with a wide-angle and high-focusing performance, high-speed radio communication devices, and control units with large data storage on both the DCAM3 unit and the spacecraft. These components were successfully developed under severe constraints of size, mass and power, and the whole DCAM3-D system has passed all tests verifying functions, performance, and environmental tolerance. Results indicated sufficient potential to conduct the scientific observations during the SCI impact experiment. An operation plan was carefully considered along with the configuration and a time schedule of the impact experiment, and pre-programed into the control unit before the launch. In this paper, we describe details of the system design concept, specifications, and the operating plan of the DCAM3-D system, focusing on the feasibility of scientific observations.

  12. System Configuration and Operation Plan of Hayabusa2 DCAM3-D Camera System for Scientific Observation During SCI Impact Experiment

    Science.gov (United States)

    Ogawa, Kazunori; Shirai, Kei; Sawada, Hirotaka; Arakawa, Masahiko; Honda, Rie; Wada, Koji; Ishibashi, Ko; Iijima, Yu-ichi; Sakatani, Naoya; Nakazawa, Satoru; Hayakawa, Hajime

    2017-03-01

    An artificial impact experiment is scheduled for 2018-2019 in which an impactor will collide with asteroid 162137 Ryugu (1999 JU3) during the asteroid rendezvous phase of the Hayabusa2 spacecraft. The small carry-on impactor (SCI) will shoot a 2-kg projectile at 2 km/s to create a crater 1-10 m in diameter with an expected subsequent ejecta curtain of a 100-m scale on an ideal sandy surface. A miniaturized deployable camera (DCAM3) unit will separate from the spacecraft at about 1 km from impact, and simultaneously conduct optical observations of the experiment. We designed and developed a camera system (DCAM3-D) in the DCAM3, specialized for scientific observations of impact phenomenon, in order to clarify the subsurface structure, construct theories of impact applicable in a microgravity environment, and identify the impact point on the asteroid. The DCAM3-D system consists of a miniaturized camera with a wide-angle and high-focusing performance, high-speed radio communication devices, and control units with large data storage on both the DCAM3 unit and the spacecraft. These components were successfully developed under severe constraints of size, mass and power, and the whole DCAM3-D system has passed all tests verifying functions, performance, and environmental tolerance. Results indicated sufficient potential to conduct the scientific observations during the SCI impact experiment. An operation plan was carefully considered along with the configuration and a time schedule of the impact experiment, and pre-programed into the control unit before the launch. In this paper, we describe details of the system design concept, specifications, and the operating plan of the DCAM3-D system, focusing on the feasibility of scientific observations.

  13. Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems. Operations and Transmission Planning

    Energy Technology Data Exchange (ETDEWEB)

    Milligan, Michael [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ela, Erik [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hein, Jeff [National Renewable Energy Lab. (NREL), Golden, CO (United States); Schneider, Thomas [National Renewable Energy Lab. (NREL), Golden, CO (United States); Brinkman, Gregory [National Renewable Energy Lab. (NREL), Golden, CO (United States); Denholm, Paul [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2012-06-15

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%–90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT). Learn more at the RE Futures website. http://www.nrel.gov/analysis/re_futures/

  14. Renewable Electricity Futures Study. Volume 4: Bulk Electric Power Systems: Operations and Transmission Planning

    Energy Technology Data Exchange (ETDEWEB)

    Milligan, M.; Ela, E.; Hein, J.; Schneider, T.; Brinkman, G.; Denholm, P.

    2012-06-01

    The Renewable Electricity Futures (RE Futures) Study investigated the challenges and impacts of achieving very high renewable electricity generation levels in the contiguous United States by 2050. The analysis focused on the sufficiency of the geographically diverse U.S. renewable resources to meet electricity demand over future decades, the hourly operational characteristics of the U.S. grid with high levels of variable wind and solar generation, and the potential implications of deploying high levels of renewables in the future. RE Futures focused on technical aspects of high penetration of renewable electricity; it did not focus on how to achieve such a future through policy or other measures. Given the inherent uncertainties involved with analyzing alternative long-term energy futures as well as the multiple pathways that might be taken to achieve higher levels of renewable electricity supply, RE Futures explored a range of scenarios to investigate and compare the impacts of renewable electricity penetration levels (30%-90%), future technology performance improvements, potential constraints to renewable electricity development, and future electricity demand growth assumptions. RE Futures was led by the National Renewable Energy Laboratory (NREL) and the Massachusetts Institute of Technology (MIT).

  15. Methods for planning and operating decentralized combined heat and power plants

    Energy Technology Data Exchange (ETDEWEB)

    Palsson, H.

    2000-02-01

    In recent years, the number of decentralized combined heat and power (DCHP) plants, which are typically located in small communities, has grown rapidly. These relatively small plants are based on Danish energy resources, mainly natural gas, and constitute an increasing part of the total energy production in Denmark. The topic of this thesis is the analysis of DCHP plants, with the purpose to optimize the operation of such plants. This involves the modelling of district heating systems, which are frequently connected to DCHP plants, as well as the use of heat storage for balancing between heat and power production. Furthermore, the accumulated effect from increasing number of DCHP plants on the total power production is considered. Methods for calculating dynamic temperature response in district heating (DH) pipes have been reviewed and analyzed numerically. Furthermore, it has been shown that a tree-structured DH network consisting of about one thousand pipes can be reduced to a simple chain structure of ten equivalent pipes without loosing much accuracy when temperature dynamics are calculated. A computationally efficient optimization method based on stochastic dynamic programming has been designed to find an optimum start-stop strategy for a DCHP plant with a heat storage. The method focuses on how to utilize heat storage in connection with CHP production. A model for the total power production in Eastern Denmark has been applied to the accumulated DCHP production. Probability production simulations have been extended from the traditional power-only analysis to include one or several heat supply areas. (au)

  16. DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program. Joint Research and Development Plan

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Don

    2014-04-01

    Nuclear power has contributed almost 20% of the total amount of electricity generated in the United States over the past two decades. High capacity factors and low operating costs make nuclear power plants (NPPs) some of the most economical power generators available. Further, nuclear power remains the single largest contributor (nearly 70%) of non-greenhouse gas-emitting electric power generation in the United States. Even when major refurbishments are performed to extend operating life, these plants continue to represent cost-effective, low-carbon assets to the nation’s electrical generation capability. By the end of 2014, about one-third of the existing domestic fleet will have passed their 40th anniversary of power operations, and about one-half of the fleet will reach the same 40-year mark within this decade. Recognizing the challenges associated with pursuing extended service life of commercial nuclear power plants, the U.S. Department of Energy’s (DOE) Office of Nuclear Energy (NE) and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs (DOE-NE’s Light Water Reactor Sustainability [LWRS] Program and EPRI’s Long-Term Operations [LTO] Program) to address these challenges. To ensure that a proper linkage is maintained between the programs, DOE-NE and EPRI executed a memorandum of understanding in late 2010 to “establish guiding principles under which research activities (between LWRS and LTO) could be coordinated to the benefit of both parties.” This document represents the third annual revision to the initial version (March 2011) of the plan as called for in the memorandum of understanding.

  17. Development of integrated forest management/harvesting plans for biomass supply operations in remote northern community settings

    Energy Technology Data Exchange (ETDEWEB)

    VanEvery, K.C.; Higgelke, P.

    2000-07-01

    The use of district heating and mini-district heating systems are attractive options for remote Aboriginal communities. Biomass district heating combines new technology with a traditional source of energy. The systems usually consist of a biomass-fuelled central furnace/boiler system and a network of insulated pipes. The boiler heats water, which is distributed to several buildings connected to the system. The heated water, which is used for space heating, recirculates to the central furnace where it is reheated. The system is also used to produce potable hot water. A mini-district heating system can work well for communities looking to heat clusters of buildings such as schools, residences, and any other buildings. The advantages of biomass burning systems include cost savings, employment generation, improved retention of community funds, enhanced community self-reliance, decreased potential for fuel spills, reduced net-gain in air pollution because the heating systems are carbon neutral, reduced household fire hazard, and a readily available source of natural resources. The Ouje-Bougoumou Cree Nation in northern Quebec and Grassy Narrows First Nation in northern Ontario have both provided examples of successful construction and operation of biomass-fuelled heating systems for their communities. The source of biomass for both communities is wood fibre waste produced by nearby sawmills. This paper presented a basic description of the components needed in developing an Integrated Forest Management and Biomass-Harvesting Plan for remote communities. It is based on an Integrated Forest Management Harvesting Plan completed for Eabametoong First Nation in northern Ontario which was looking into biomass as an alternative heating source. The paper also provided a summary of the considerations that should be examined for the development of small-scale Integrated Forest Management Harvesting Plan for wood biomass production. These considerations include community

  18. Recovery Efficiency Test Project: Phase 1, Activity report. Volume 1: Site selection, drill plan preparation, drilling, logging, and coring operations

    Energy Technology Data Exchange (ETDEWEB)

    Overbey, W.K. Jr.; Carden, R.S.; Kirr, J.N.

    1987-04-01

    The recovery Efficiency Test well project addressed a number of technical issues. The primary objective was to determine the increased efficiency gas recovery of a long horizontal wellbore over that of a vertical wellbore and, more specifically, what improvements can be expected from inducing multiple hydraulic fractures from such a wellbore. BDM corporation located, planned, and drilled a long radius turn horizontal well in the Devonian shale Lower Huron section in Wayne County, West Virginia, demonstrating that state-of-the-art technology is capable of drilling such wells. BDM successfully tested drilling, coring, and logging in a horizontal well using air as the circulating medium; conducted reservoir modeling studies to protect flow rates and reserves in advance of drilling operations; observed two phase flow conditions in the wellbore not observed previously; cored a fracture zone which produced gas; observed that fractures in the core and the wellbore were not systematically spaced (varied from 5 to 68 feet in different parts of the wellbore); observed that highest gas show rates reported by the mud logger corresponded to zone with lowest fracture spacing (five feet) or high fracture frequency. Four and one-half inch casting was successfully installed in the borehole and was equipped to isolate the horizontal section into eight (8) zones for future testing and stimulation operations. 6 refs., 48 figs., 10 tabs.

  19. Operational Simulation Tools and Long Term Strategic Planning for High Penetrations of PV in the Southeastern United States

    Energy Technology Data Exchange (ETDEWEB)

    Tuohy, Aidan [Electric Power Research Institute, Knoxville, TN (United States); Smith, Jeff [Electric Power Research Institute, Knoxville, TN (United States); Rylander, Matt [Electric Power Research Institute, Knoxville, TN (United States); Singhvi, Vikas [Electric Power Research Institute, Knoxville, TN (United States); Enbar, Nadav [Electric Power Research Institute, Knoxville, TN (United States); Coley, Steven [Electric Power Research Institute, Knoxville, TN (United States); Roark, Jeff [Electric Power Research Institute, Knoxville, TN (United States); Ela, Erik [Electric Power Research Institute, Knoxville, TN (United States); Lannoye, Eamonn [Electric Power Research Institute, Knoxville, TN (United States); Pilbrick, Charles Russ [Electric Power Research Institute, Knoxville, TN (United States); Rudkevich, Alex [Electric Power Research Institute, Knoxville, TN (United States); Hansen, Cliff [Electric Power Research Institute, Knoxville, TN (United States)

    2016-07-11

    Increasing levels of distributed and utility scale Solar Photovoltaics (PV) will have an impact on many utility functions, including distribution system operations, bulk system performance, business models and scheduling of generation. In this project, EPRI worked with Southern Company Services and its affiliates and the Tennessee Valley Authority to assist these utilities in their strategic planning efforts for integrating PV, based on modeling, simulation and analysis using a set of innovative tools. Advanced production simulation models were used to investigate operating reserve requirements. To leverage existing work and datasets, this last task was carried out on the California system. Overall, the project resulted in providing useful information to both of the utilities involved and through the final reports and interactions during the project. The results from this project can be used to inform the industry about new and improved methodologies for understanding solar PV penetration, and will influence ongoing and future research. This report summarizes each of the topics investigated over the 2.5-year project period.

  20. The planning, construction, and operation of a radioactive waste storage facility for an Australian state radiation regulatory authority

    Energy Technology Data Exchange (ETDEWEB)

    Wallace, J.D.; Kleinschmidt, R.; Veevers, P. [Radiation Health, Queensland (Australia)

    1995-12-31

    Radiation regulatory authorities have a responsibility for the management of radioactive waste. This, more often than not, includes the collection and safe storage of radioactive sources in disused radiation devices and devices seized by the regulatory authority following an accident, abandonment or unauthorised use. The public aversion to all things radioactive, regardless of the safety controls, together with the Not In My Back Yard (NIMBY) syndrome combine to make the establishment of a radioactive materials store a near impossible task, despite the fact that such a facility is a fundamental tool for regulatory authorities to provide for the radiation safety of the public. In Queensland the successful completion and operational use of such a storage facility has taken a total of 8 years of concerted effort by the staff of the regulatory authority, the expenditure of over $2 million (AUS) not including regulatory staff costs and the cost of construction of an earlier separate facility. This paper is a summary of the major developments in the planning, construction and eventual operation of the facility including technical and administrative details, together with the lessons learned from the perspective of the overall project.