  1. Lessons learned from an installation perspective for chemical demilitarization plant start-up at four operating incineration sites.

    Energy Technology Data Exchange (ETDEWEB)

    Motz, L.; Decision and Information Sciences

    2011-02-21

    This study presents the lessons learned by chemical storage installations as they prepared for the start of chemical demilitarization plant operations at the four current chemical incinerator sites in Alabama, Arkansas, Oregon, and Utah. The study included interviews with persons associated with the process and collection of available documents prepared at each site. The goal was to provide useful information for the chemical weapons storage sites in Colorado and Kentucky that will be going through plant start-up in the next few years. The study is not a compendium of what to do and what not to do. The information has been categorized into ten lessons learned; each is discussed individually. Documents that may be useful to the Colorado and Kentucky sites are included in the appendices. This study should be used as a basis for planning and training.

  2. Release mitigation spray safety systems for chemical demilitarization applications.

    Energy Technology Data Exchange (ETDEWEB)

    Leonard, Jonathan; Tezak, Matthew Stephen; Brockmann, John E.; Servantes, Brandon; Sanchez, Andres L.; Tucker, Mark David; Allen, Ashley N.; Wilson, Mollye C.; Lucero, Daniel A.; Betty, Rita G.

    2010-06-01

    Sandia National Laboratories has conducted proof-of-concept experiments demonstrating effective knockdown and neutralization of aerosolized CBW simulants using charged DF-200 decontaminant sprays. DF-200 is an aqueous decontaminant, developed by Sandia National Laboratories, and procured and fielded by the US Military. Of significance is the potential application of this fundamental technology to numerous applications including mitigation and neutralization of releases arising during chemical demilitarization operations. A release mitigation spray safety system will remove airborne contaminants from an accidental release during operations, to protect personnel and limit contamination. Sandia National Laboratories recently (November, 2008) secured funding from the US Army's Program Manager for Non-Stockpile Chemical Materials Agency (PMNSCMA) to investigate use of mitigation spray systems for chemical demilitarization applications. For non-stockpile processes, mitigation spray systems co-located with the current Explosive Destruction System (EDS) will provide security both as an operational protective measure and in the event of an accidental release. Additionally, 'tented' mitigation spray systems for native or foreign remediation and recovery operations will contain accidental releases arising from removal of underground, unstable CBW munitions. A mitigation spray system for highly controlled stockpile operations will provide defense from accidental spills or leaks during routine procedures.

  3. Reactive Skin Decontamination Lotion and Demilitarization: Partners in Global Safety

    International Nuclear Information System (INIS)

    Feghali, N.

    2007-01-01

    The work of demilitarization relies on procedures, equipment, and training to minimize exposure to Chemical Warfare agents. As an additional safeguard, immediate access to Reactive Skin Decontamination Lotion (RSDL) can minimize the harm of accidental exposure to CW agents. To illustrate the advantage of having RSDL available during demilitarization, this presentation will compare the outcomes of two patients who were exposed to Mustard, one of which was treated with RSDL and one that was not. Two individuals were exposed to mustard during a demilitarization operation at Defence Research and Development Canada; the two individuals received different treatments. Patient A: Treatment was not immediate, but RSDL was applied within the first 24 hours following exposure. Subsequently, treatment included depressurizing the blister, silver sulfadiazine dressing and the intake of oral antibiotics. Patient A healed over seven days and returned to work soon thereafter. Patient B: Treatment followed the then existing standard approach which included immersion in a detergent solution. Subsequently, treatment included depressurizing the blister, silver sulfadiazine dressing and oral antibiotics. Patient B required oral prophylactic antibiotics, topical and oral antihistamines and topical steroids and a recovery time of four weeks. While RSDL significantly increased the recovery time and reduced the suffering, it should be pointed out that if RSDL had been pre-positioned in the laboratory, an even greater impact on patient recovery should have been expected. Immediate access to RSDL is even more important for the faster acting agents and should be considered as an essential part of all demilitarization activities. (author)

  4. Handling of the demilitarized zone using service providers in SAP

    Science.gov (United States)

    Iovan, A.; Robu, R.

    2016-02-01

    External collaboration needs to allow data access from the Internet. In a trusted Internet collaboration scenario where the external user works on the same data like the internal user direct access to the data in the Intranet is required. The paper presents a solution to get access to certain data in the Enterprise Resource Planning system, having the User Interface on a system in the Demilitarized Zone and the database on a system which is located in the trusted area. Using the Service Provider Interface framework, connections between separate systems can be created in different areas of the network. The paper demonstrates how to connect the two systems, one in the Demilitarized Zone and one in the trusted area, using SAP ERP 6.0 with Enhancement Package 7. In order to use the Service Provider Interface SAP Business Suite Foundation component must be installed in both systems. The advantage of using the Service Provider Interface framework is that the external user works on the same data like the internal user (and not on copies). This assures data consistency and less overhead for backup and security systems.

  5. Applications of direct chemical oxidation to demilitarization

    Energy Technology Data Exchange (ETDEWEB)

    Cooper, J.F., LLNL

    1998-06-01

    Research is reported concerning an aqueous process for oxidative destruction of solid- and liquid organic wastes, including ongoing work relevant to demilitarization This process uses acidified ammonium- or sodium peroxydisulfate and operates at ambient pressure and at temperatures of 80- 100 C The oxidant may be regenerated by electrolysis of the sulfate by- product at Pt anodes at roughly 80% coulombic efficiency, even in the presence of inorganic contaminants (e g , nitrate, phosphate or chloride) found in the original waste and entrained in the recycle stream Integral rate constants have been determined for the oxidation of diverse organic compounds at low concentrations (50 ppm, C), with rate constants (based on equivalents) of 0 004-O 02 miri Higher concentrations generally react at a 2-4X higher rate. The process has been carried through full- scale laboratory tests and initial pilot plant tests on chlorinated solvents, using a hydrolysis pretreatment Integral rate data indicate throughput rates of about 200 kg- C/m3-day The process may benefit the demilitarization efforts in various specialized applications destruction of solvents; destruction of trace propellants and explosives in shell casings remaining after bulk removal, destruction of red and pink waters, in situ remediation of soils at open pit burning/detonation sites; and as a regenerative filter for offgas carrying toxic or explosive substances.

  6. US demilitarization and global warming

    International Nuclear Information System (INIS)

    Heyes, A.G.; Liston-Heyes, C.; Royal Holloway and Bedford New College, London

    1993-01-01

    In the paper input-output methods are used to generate ballpark empirical estimates of the implications for global warming of the projected demilitarization of the US federal budget. The impact is found to be qualitatively ambiguous, and highly sensitive to the manner in which the funds saved are distributed. The effect is adverse where the budgetary savings are used to fund economy-wide cuts in personal taxation and/or deficit reduction. In other cases the effect may be neutral or beneficial. (author)

  7. Defense Logistics Agency Disposition Services Needs to Improve Demilitarization Program Self-Assessment Evaluations - Redacted

    Science.gov (United States)

    2016-12-20

    from mandatory disclosure under the Freedom of Information Act. Defense Logistics Agency Disposition Services Needs to Improve Demilitarization...Project No. D2016-D000RD-0057.000) │ i Results in Brief Defense Logistics Agency Disposition Services Needs to Improve Demilitarization Program Self...Assessment Evaluations Visit us at www.dodig.mil December 20, 2016 Objective Our audit objective was to determine whether the Defense Logistics Agency

  8. Demilitarization of the Siachen conflict zone : concepts for implementation and monitoring.

    Energy Technology Data Exchange (ETDEWEB)

    Kanwal, Gurmeet (Indian Army); Hakeem, Asad (Pakistan Army); Vannoni, Michael Geoffrey; Rajen, Gaurav

    2007-09-01

    Pakistani and Indian militaries have been occupying the Siachen Glacier and surrounding regions for decades. Although a cease-fire is in place, continued occupation carries the risk of an inadvertent conflict, which could escalate into a full-fledged nuclear-backed confrontation. Political and military analysts in Pakistan and India now question the strategic significance of the Siachen Glacier and agree that under the right circumstances, military withdrawal from the Siachen Glacier region would not adversely affect either state. The difficulty lies in conducting the withdrawal in such a way that neither side feels vulnerable, and in maintaining the demilitarization in a way that can be verified. In this paper, the authors who have both held command responsibilities in the Siachen Glacier region present a process for conducting and verifying the demilitarization of the Siachen Glacier region. The authors discuss the role of monitoring and verification tools and their relevance to this border zone of conflict.

  9. CFD SIMULATION FOR DEMILITARIZATION OF RDX IN A ROTARY KILN BY THERMAL DECOMPOSITION

    Directory of Open Access Journals (Sweden)

    SI H. LEE

    2017-06-01

    Full Text Available Demilitarization requires the recovery and disposal of obsolete ammunition and explosives. Since open burning/detonation of hazardous waste has caused serious environmental and safety problems, thermal decomposition has emerged as one of the most feasible methods. RDX is widely used as a military explosive due to its high melting temperature and detonation power. In this work, the feasible conditions under which explosives can be safely incinerated have been investigated via a rotary kiln simulation. To solve this problem, phase change along with the reactions of RDX has been incisively analyzed. A global reaction mechanism consisting of condensed phase and gas phase reactions are used in Computational Fluid Dynamics simulation. User Defined Functions in FLUENT is utilized in this study to inculcate the reactions and phase change into the simulation. The results divulge the effect of temperature and the varying amounts of gas produced in the rotary kiln during the thermal decomposition of RDX. The result leads to the prospect of demilitarizing waste explosives to avoid the possibility of detonation.

  10. A System Analysis of the Recruitment and Retention Problems Associated with the Program Manager for Chemical Demilitarization Organization

    National Research Council Canada - National Science Library

    Gottschalk, Laurence

    2001-01-01

    The primary purpose of this thesis is to investigate the problems of retaining qualified personnel in the Program Manager for Chemical Demilitarization organization through the end date of the program...

  11. Personnel selection, training and certification in the U.S. Army Chemical Demilitarization Program

    International Nuclear Information System (INIS)

    Howarth, R.J.; Findlay, K.W.; Cohen, S.L.

    1991-01-01

    This paper describes the major steps taken to assure the US Army, as well as state and federal officials, that the individuals slated to operate and maintain future chemical disposal facilities will be carefully screened, well-trained and certified to safely carry out their tasks. Careful personnel screening, total plant staff training, individual qualification and team certification protect plant personnel, the public and the environment. Experience has shown that the care taken in adequate screening of job applicants for highly technical and potentially hazardous work results in fewer incidents or accidents on the job. To ensure that each individual selected receives appropriate and necessary training, the US Army has constructed a five-building Chemical Demilitarization Training Facility (CDTF), which may set future standards in the hazardous waste disposal industry. The training center contains automated chemical agent material handling equipment, multiple furnace and pollution abatement system dynamic control room simulations and five laboratories for training agent analysis and monitoring personnel. A qualification and certification program marks the end of the training and verifies that plant employees are fully prepared to operate the disposal facility safely

  12. Operation planning device

    International Nuclear Information System (INIS)

    Watanabe, Takashi; Odakawa, Naoto; Erikuchi, Makoto; Okada, Masayuki; Koizumi, Atsuhiko.

    1996-01-01

    The device of the present invention provides a device suitable for monitoring a reactor core state and operation replanning in terms of reactor operation. Namely, (1) an operation result difference judging means judges that replanning is necessary when the operation results deviates from the operation planning, (2) an operation replanning rule data base storing means stores a deviation key which shows various kinds of states where the results deviate from the planning and a rule for replanning for returning to the operation planning on every deviating key, (3) an operation replanning means forms a new operation planning in accordance with the rule which is retrieved based on the deviation key, (4) an operation planning optimizing rule data base storing means evaluates the reformed planning and stores it on every evaluation item, (5) an operation planning optimization means correct the operation planning data so as to be optimized when the evaluation of the means (4) is less than a reference value, and (6) an operation planning display means edits adaptable operation planning data and the result of the evaluation and displays them. (I.S.)

  13. Demonstration of Plasma Arc Environmental Technology Applications for the Demilitarization of DOD Stockpiles

    Science.gov (United States)

    Smith, Ed; Zaghloul, Hany; Filius, Krag; Rivers, Tim

    2000-01-01

    Since 1989 the U.S. Army Construction Engineering Research Laboratories (USACERL) have been active participants in the research and development toward establishing Plasma Arc Technology (PAT) as an efficient, economical, and safe hazardous waste immobilization tool. A plasma torch capable of generating high temperatures makes this technology a viable and powerful tool for the thermal destruction of various military industrial waste streams into an innocuous ceramic material no longer requiring hazardous waste landfill (Class 1) disposal. The emerging pl asma environmental thermal treatment process, has been used to safely and efficiently meet the waste disposal needs for various demilitarized components disposal needs, such as: pyrotechnic smoke assemblies, thermal batteries, proximity fuses, cartridge actuated devices (CAD's), and propellant actuated devices (PAD's). MSE Technology Applications, Inc., (MSE) has proposed and fabricated a Mobile Plasma Treatment System to be a technology demonstrator for pilot-scale mobile plasma waste processing. The system is capable of providing small-scale waste remediation services, and conducting waste stream applicability demonstrations. The Mobile Plasma Treatment System's innovative concept provides the flexibility to treat waste streams at numerous sites and sites with only a limited quantity of waste, yet too hazardous to transport to a regional fixed facility. The system was designed to be operated as skid mounted modules; consisting of a furnace module, controls module, offgas module, and ancillary systems module. All system components have been integrated to be operated from a single control station with both semi-continuous feeding and batch slag-pouring capability.

  14. Destroying Weapons of Coal, Air and Water: A Critical Evaluation of the American Policy of German Industrial Demilitarization 1945-1952

    OpenAIRE

    Haller, Oliver

    2007-01-01

    This dissertation analyses the American development and execution of the industrial demilitarization program in occupied Germany after World War II. Both Roosevelt and Truman administrations tackled the task of more or less permanently removing the basic German potential to produce armaments. A new understanding of industrial processes led policymakers to advocate the elimination of general or civilian manufacturing capacities ...

  15. Operating plan FY 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  16. 30 CFR 780.14 - Operation plan: Maps and plans.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 780.14 Section... PLAN § 780.14 Operation plan: Maps and plans. Each application shall contain maps and plans as follows: (a) The maps and plans shall show the lands proposed to be affected throughout the operation and any...

  17. 30 CFR 784.23 - Operation plan: Maps and plans.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 784.23 Section... PLAN § 784.23 Operation plan: Maps and plans. Each application shall contain maps and plans as follows... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  18. Reactor operation plan preparing device

    International Nuclear Information System (INIS)

    Sano, Hiroki; Maruyama, Hiromi; Kinoshita, Mitsuo; Fukuzaki, Koji; Banto, Masaru; Fukazawa, Yukihisa.

    1993-01-01

    The device comprises a means for retrieving a control rod pattern capable of satisfying a thermal limit upon aimed power/minimum flow rate and providing minimum xenon and a control rod pattern maximum xenon. It further comprises a means for selecting a control rod pattern corresponding to a xenon equilibrium condition, and selecting a control rod which provides a greater thermal margin to provide a control rod operation sequence for each of the patterns. Further, the device comprises an outline plan preparing means and a correction means therefor, a simplified sequence table reference means operated along with sequence change, an operation limit region input means, a control rod operation preferential region changing means, a thermal margin evaluation region and an input means. This can automatically prepare the operation plan, decrease the times for preparation of detailed plans by using the outline plan preparing function, thereby enabling to remarkably shorten the time for preparing of an operation plan. (N.H.)

  19. Joint Operation Planning

    National Research Council Canada - National Science Library

    2006-01-01

    .... It sets forth joint doctrine to govern the joint operation planning activities and performance of the Armed Forces of the United States in joint operations, and provides the joint doctrinal basis...

  20. Logistics planning and logistics planning factors for humanitarian operations

    OpenAIRE

    Sullivan, Donna Marie.

    1995-01-01

    Due to the increasing demand on the military to conduct humanitarian operations, the need for logistics planning factors that are applicable to these operations has arisen. This thesis develops a model for humanitarian operations and employs the model to develop logistics planning factors for material consumption and a computer-assisted planning aid relating to the support of the victim population. U.S. Navy (U.S.N.) author.

  1. Emissions characterization in the contained underground demilitarization laboratory at Nevada Test Site

    International Nuclear Information System (INIS)

    Velsko, C A; Watkins, B E; Pruneda, C O; Lipkin, J

    1999-01-01

    The US Departments of Defense and Energy (DOD and DOE) have established a Joint Demilitarization Technology (JDT) Program to demonstrate and validate technologies for resource recovery and recycling, as well as alternative destruction or treatment technologies as appropriate to specific conventional stockpile segments. X-Tunnel at the DOE Nevada Test Site is a facility for emissions characterization from detonation of conventional munitions and burning of rocket motors. We conducted seven detonations of M107, high explosive 155-mm projectiles, four from December 1996 through March 1997 and three during July and August 1999. We also completed three burns of rocket motors from May through June 1997.Standard (DOD) procedures for open detonation (DOD) of ordinance and open burn (OB) of rocket motors were followed in order to establish baseline emissions. Measurements inside the chamber included pressures, temperatures, relative humidity and gas concentrations. Grab samples were collected f or gas, organic, metal and particulate analyses. Results and implications for developing alternative destruction techniques will be presented

  2. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs.

  3. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume II. Integrated operations plan

    International Nuclear Information System (INIS)

    1981-12-01

    This document defines an integrated plan for the operation of the Lawrence Livermore National Laboratory (LLNL) Mirror Fusion Test Facility (MFTF-B). The plan fulfills and further delineates LLNL policies and provides for accomplishing the functions required by the program. This plan specifies the management, operations, maintenance, and engineering support responsibilities. It covers phasing into sustained operations as well as the sustained operations themselves. Administrative and Plant Engineering support, which are now being performed satisfactorily, are not part of this plan unless there are unique needs

  4. Space shuttle operations integration plan

    Science.gov (United States)

    1975-01-01

    The Operations Integration Plan is presented, which is to provide functional definition of the activities necessary to develop and integrate shuttle operating plans and facilities to support flight, flight control, and operations. It identifies the major tasks, the organizations responsible, their interrelationships, the sequence of activities and interfaces, and the resultant products related to operations integration.

  5. Warehouse operations planning model for Bausch & Lomb

    NARCIS (Netherlands)

    Atilgan, Ceren

    2009-01-01

    Operations planning is a major part of the Sales& Operations Planning (S&OP) process. It provides an overview on the operations capacity requirements by considering the supply and demand plan. However, Bausch& Lomb does not have a structured operations planning process for their warehouse

  6. Operating Plan and Guidelines (2011 - 2016)

    International Nuclear Information System (INIS)

    2011-01-01

    The Committee on Nuclear Regulatory Activities (CNRA) of the OECD Nuclear Energy Agency (NEA) is an international committee made up primarily of senior nuclear regulators. It was established in 1989 as a forum for the exchange of information and experience among regulatory organisations and for the review of developments which could affect regulatory requirements. The Committee is responsible for the programme of the NEA, concerning the regulation, licensing and inspection of nuclear installations. In particular, the Committee reviews current practices and operating experience. The Joint CSNI/CNRA Strategic Plan states that: The Operating Plan for each committee aligns with the Joint CNRA/ CSNI Strategic Plan. The Committee's Operating Plans describes each Committee's organisation, priorities, and operating procedures to be used in fulfilling their mandates in accordance with this strategic plan. Specific attention will be given to ensure that cross-cutting issues are satisfactorily dealt with. This report represents such an operating plan. The intention is that it should fit onto a new third rung on the ladder representing the hierarchy of documents that govern the work of CNRA. At the top of this hierarchy is the Strategic Plan of the NEA; immediately below that is the Joint CSNI/CNRA Strategic Plan; followed by the new operating plan and the guidelines for methods of work. This plan sets the basis for establishing the current CNRA Programme of Work. Since the issuance of the last plan in 2007 there has been a significant shift and many member countries are now constructing new facilities or in the process of legislative or technical processing for new licenses. This comes along in an atmosphere in which current operating plants requesting power up-rates, extended licenses, and substantial activity in new licensing and new construction. It is clear that all these activities require similar attention from the regulators and operators, and the responsibilities

  7. 30 CFR 780.13 - Operation plan: Blasting.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Blasting. 780.13 Section 780.13... SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.13 Operation plan: Blasting. (a) Blasting plan. Each application shall contain a blasting plan for the proposed...

  8. Biomedical programs operations plans

    Science.gov (United States)

    Walbrecher, H. F.

    1974-01-01

    Operational guidelines for the space shuttle life sciences payloads are presented. An operational assessment of the medical experimental altitude test for Skylab, and Skylab life sciences documentation are discussed along with the operations posture and collection of space shuttle operational planning data.

  9. The Mission Operations Planning Assistant

    Science.gov (United States)

    Schuetzle, James G.

    1987-01-01

    The Mission Operations Planning Assistant (MOPA) is a knowledge-based system developed to support the planning and scheduling of instrument activities on the Upper Atmospheric Research Satellite (UARS). The MOPA system represents and maintains instrument plans at two levels of abstraction in order to keep plans comprehensible to both UARS Principal Investigators and Command Management personnel. The hierarchical representation of plans also allows MOPA to automatically create detailed instrument activity plans from which spacecraft command loads may be generated. The MOPA system was developed on a Symbolics 3640 computer using the ZetaLisp and ART languages. MOPA's features include a textual and graphical interface for plan inspection and modification, recognition of instrument operational constraint violations during the planning process, and consistency maintenance between the different planning levels. This paper describes the current MOPA system.

  10. Architecture for spacecraft operations planning

    Science.gov (United States)

    Davis, William S.

    1991-01-01

    A system which generates plans for the dynamic environment of space operations is discussed. This system synthesizes plans by combining known operations under a set of physical, functional, and temperal constraints from various plan entities, which are modeled independently but combine in a flexible manner to suit dynamic planning needs. This independence allows the generation of a single plan source which can be compiled and applied to a variety of agents. The architecture blends elements of temperal logic, nonlinear planning, and object oriented constraint modeling to achieve its flexibility. This system was applied to the domain of the Intravehicular Activity (IVA) maintenance and repair aboard Space Station Freedom testbed.

  11. Operator-assisted planning and execution of proximity operations subject to operational constraints

    Science.gov (United States)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1991-01-01

    Future multi-vehicle operations will involve multiple scenarios that will require a planning tool for the rapid, interactive creation of fuel-efficient trajectories. The planning process must deal with higher-order, non-linear processes involving dynamics that are often counter-intuitive. The optimization of resulting trajectories can be difficult to envision. An interaction proximity operations planning system is being developed to provide the operator with easily interpreted visual feedback of trajectories and constraints. This system is hosted on an IRIS 4D graphics platform and utilizes the Clohessy-Wiltshire equations. An inverse dynamics algorithm is used to remove non-linearities while the trajectory maneuvers are decoupled and separated in a geometric spreadsheet. The operator has direct control of the position and time of trajectory waypoints to achieve the desired end conditions. Graphics provide the operator with visualization of satisfying operational constraints such as structural clearance, plume impingement, approach velocity limits, and arrival or departure corridors. Primer vector theory is combined with graphical presentation to improve operator understanding of suggested automated system solutions and to allow the operator to review, edit, or provide corrective action to the trajectory plan.

  12. Space Station Freedom operations planning

    Science.gov (United States)

    Accola, Anne L.; Keith, Bryant

    1989-01-01

    The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.

  13. Automating Space Station operations planning

    Science.gov (United States)

    Ziemer, Kathleen A.

    1989-01-01

    The development and implementation of the operations planning processes for the Space Station are discussed. A three level planning process, consisting of strategic, tactical, and execution level planning, is being developed. The integration of the planning procedures into a tactical planning system is examined and the planning phases are illustrated.

  14. AIS ASM Operational Integration Plan

    Science.gov (United States)

    2013-08-01

    Rack mount computer AIS Radio Interface Ethernet Switch 192.168.0.x Firewall Cable Modem 192.168.0.1 VTS Accred. Boundary AIS ASM Operational... AIS ASM Operational Integration Plan Distribution Statement A: Approved for public release; distribution is unlimited. August 2013 Report No...CD-D-07-15 AIS ASM Operational Integration Plan ii UNCLAS//Public | CG-926 R&DC | I. Gonin, et al. | Public August 2013 N O T I C

  15. 78 FR 21245 - Continuity of Operations Plan

    Science.gov (United States)

    2013-04-10

    ...; Order No. 778] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. SUMMARY: In this Final Rule the Commission revises its Continuity of Operations Plan... Commission's Continuity of Operations Plan (COOP) regulations to incorporate its regional offices into the...

  16. Operations program plan: Revision 3

    International Nuclear Information System (INIS)

    1988-07-01

    This document, the Operations Program Plan (OPP), has been developed as the seven-year master plan for operation of WIPP. The OPP was authorized by the Albuquerque Field Office of the Department of Energy (DOE-AL) and that organization's WIPP Project Office (DOE-WPO) in Carlsbad, New Mexico. The OPP is the directive from the DOE-WPO Project Manager as to how the WIPP is to be managed, operated, and administered. As the top tier management document for WIPP, the OPP establishes organizational responsibilities and an organizational structure for the Waste Isolation Division (WID) of Westinghouse Electric Corporation. The OPP sets policy and tone for conducting WIPP operations; it requires and specifically authorizes implementing documents (e.g., manuals). It has also proven instrumental in the budgeting and planning process, most particularly in expediting the preparation of specific budgets and detailed schedules for each of the numerous work packages. The OPP is also used to communicate information about WIPP operations

  17. 77 FR 43488 - Continuity of Operations Plan

    Science.gov (United States)

    2012-07-25

    ...; Order No. 765] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION... Operations Plan to allow the Commission the discretion to better address not only long-term and catastrophic... discretion regarding: the activation and deactivation of the Continuity of Operations Plan and any suspension...

  18. Planning Systems for Distributed Operations

    Science.gov (United States)

    Maxwell, Theresa G.

    2002-01-01

    This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.

  19. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2013-01-01

    This paper explores how the use of sales and operations planning (S&OP) may deal with the challenges set by the planning environment by investigating S&OP at four Scandinavian industrial food producers. Variables connected to the product and market, e.g. perishability, customer service elements...

  20. Operational Plan Ontology Model for Interconnection and Interoperability

    Science.gov (United States)

    Long, F.; Sun, Y. K.; Shi, H. Q.

    2017-03-01

    Aiming at the assistant decision-making system’s bottleneck of processing the operational plan data and information, this paper starts from the analysis of the problem of traditional expression and the technical advantage of ontology, and then it defines the elements of the operational plan ontology model and determines the basis of construction. Later, it builds up a semi-knowledge-level operational plan ontology model. Finally, it probes into the operational plan expression based on the operational plan ontology model and the usage of the application software. Thus, this paper has the theoretical significance and application value in the improvement of interconnection and interoperability of the operational plan among assistant decision-making systems.

  1. Shuttle operations era planning for flight operations

    Science.gov (United States)

    Holt, J. D.; Beckman, D. A.

    1984-01-01

    The Space Transportation System (STS) provides routine access to space for a wide range of customers in which cargos vary from single payloads on dedicated flights to multiple payloads that share Shuttle resources. This paper describes the flight operations planning process from payload introduction through flight assignment to execution of the payload objectives and the changes that have been introduced to improve that process. Particular attention is given to the factors that influence the amount of preflight preparation necessary to satisfy customer requirements. The partnership between the STS operations team and the customer is described in terms of their functions and responsibilities in the development of a flight plan. A description of the Mission Control Center (MCC) and payload support capabilities completes the overview of Shuttle flight operations.

  2. Systemic Operational Design: Enhancing the Joint Operation Planning Process

    National Research Council Canada - National Science Library

    Delacruz, Victor J

    2007-01-01

    Operational level commanders and their staffs require relevant and current joint doctrine that articulates the critical function of operational design and its role in the Joint Operation Planning Process (JOPP...

  3. Sales and operations planning

    DEFF Research Database (Denmark)

    Kjellsdotter, Linea; Dukovska-Popovska, Iskra; Kaipia, Riikka

    2015-01-01

    This paper investigates sales and operations planning (S&OP) at four Scandinavian industrial food producers in order to explore how the use of S&OP might help leaders to deal with the challenges set by the planning environment. Variables connected to the product and market, e.g., frequency of new...

  4. 30 CFR 784.12 - Operation plan: Existing structures.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Existing structures. 784.12... PLAN § 784.12 Operation plan: Existing structures. (a) Each application shall contain a description of... and reclamation operation. The description shall include: (1) Location; (2) Plans of the structure...

  5. 30 CFR 780.12 - Operation plan: Existing structures.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Existing structures. 780.12... PLAN § 780.12 Operation plan: Existing structures. (a) Each application shall contain a description of... and reclamation operation. The description shall include— (1) Location; (2) Plans of the structure...

  6. Operation and Maintenance Plan for the 300-FF-5 Operable Unit

    International Nuclear Information System (INIS)

    Singleton, K.M.

    1996-09-01

    This document is the operation and maintenance plan for the 300-FF-5 groundwater operable unit. The purpose of this plan is to identify tasks necessary to verify the effectiveness of the selected alternative. This plan also describes the monitoring program and administrative tasks that will be used as the preferred alternative for the remediation of groundwater in the 300-FF-5 Operable Unit. The preferred alternative selected for remediation of groundwater consists of institutional controls

  7. 14 CFR 380.33a - Operator's option plan.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Operator's option plan. 380.33a Section 380... option plan. (a) For the purposes of this part, an operator's option plan contract that states... flight leg. (b) Operator's option plan contracts shall state, in addition to the information required by...

  8. NIF Operations Management Plan, August 2011

    Energy Technology Data Exchange (ETDEWEB)

    Van Wonterghem, Bruno M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States). National Ignition Facility (NIF)

    2014-01-30

    Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in the laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the

  9. 77 FR 41107 - Decommissioning Planning During Operations

    Science.gov (United States)

    2012-07-12

    ..., 40, 50, 70, and 72 [NRC-2011-0162] Decommissioning Planning During Operations AGENCY: Nuclear... (DG) 4014, ``Decommissioning Planning During Operations.'' This guide describes a method that the NRC staff considers acceptable for use in complying with the NRC's Decommissioning Planning Rule. The NRC...

  10. 76 FR 77431 - Decommissioning Planning During Operations

    Science.gov (United States)

    2011-12-13

    ... (DG) DG-4014, ``Decommissioning Planning During Operations.'' This guide describes a method that the.... The draft regulatory guide entitled, ``Decommissioning Planning During Operations,'' is temporarily..., 40, 50, 70, and 72 RIN 3150-AI55 [NRC-2011-0286; NRC-2008-0030] Decommissioning Planning During...

  11. 78 FR 663 - Decommissioning Planning During Operations

    Science.gov (United States)

    2013-01-04

    ...] Decommissioning Planning During Operations AGENCY: Nuclear Regulatory Commission. ACTION: Regulatory guide..., ``Decommissioning Planning During Operations.'' The guide describes a method that the NRC staff considers acceptable for use by holders of licenses in complying with the NRC's Decommissioning Planning Rule (DPR) (76 FR...

  12. Simulation-based decision support for evaluating operational plans

    Directory of Open Access Journals (Sweden)

    Johan Schubert

    2015-12-01

    Full Text Available In this article, we describe simulation-based decision support techniques for evaluation of operational plans within effects-based planning. Using a decision support tool, developers of operational plans are able to evaluate thousands of alternative plans against possible courses of events and decide which of these plans are capable of achieving a desired end state. The objective of this study is to examine the potential of a decision support system that helps operational analysts understand the consequences of numerous alternative plans through simulation and evaluation. Operational plans are described in the effects-based approach to operations concept as a set of actions and effects. For each action, we examine several different alternative ways to perform the action. We use a representation where a plan consists of several actions that should be performed. Each action may be performed in one of several different alternative ways. Together these action alternatives make up all possible plan instances, which are represented as a tree of action alternatives that may be searched for the most effective sequence of alternative actions. As a test case, we use an expeditionary operation with a plan of 43 actions and several alternatives for these actions, as well as a scenario of 40 group actors. Decision support for planners is provided by several methods that analyze the impact of a plan on the 40 actors, e.g., by visualizing time series of plan performance. Detailed decision support for finding the most influential actions of a plan is presented by using sensitivity analysis and regression tree analysis. Finally, a decision maker may use the tool to determine the boundaries of an operation that it must not move beyond without risk of drastic failure. The significant contribution of this study is the presentation of an integrated approach for evaluation of operational plans.

  13. Effective operational oil spill response planning

    International Nuclear Information System (INIS)

    Meyers, R.J.

    1991-01-01

    An operational Contingency Plan is one of the single most important aspects of effective oil spill response operations. It is a spill control game plan. A thorough contingency plan provides a set of guidelines that can be used to help direct all phases of spill response activities. More than simple a compilation of lists and rosters, the contingency plan reflects strategic and philosophical elements of spill response that help to ensure a viable response to any spill incident. Facilities and oil carrying vessels should have well maintained contingency plans with these features. This paper describes the requirement for effective oil spill response pans and the training required to exercise them

  14. A planning concept incorporating the knowledge of both planning and operations personnel

    Energy Technology Data Exchange (ETDEWEB)

    Valenca, M M; Nepomuceno, L; Teixeira, J C.F.; Santos, Junior, A [Universidade Estadual de Campinas, SP (Brazil)

    1994-12-31

    In this paper, the electrical operation planning problem and the available technological possibilities for the improvement of planner`s work process are analyzed. The importance of the expert`s experience in efficient operation plans production is pointed out. The useful knowledge in planning and operating environments and their automation by Artificial Intelligence techniques are evaluated. Finally, conception of a decision-making support system allowing the interaction of storage expertise with analysis programs proposed, in order to improve the planning process. (author) 15 refs., 4 figs.

  15. Operation Chromite: Amphibious Planning

    OpenAIRE

    2005-01-01

    tut present Tutorial Presentation Interactive Media Element This interactive tutorial covers the Inchon landing case study that provides several good examples of the types of decisions made during the amphibious planning process, and how they compare to the current matrix of the ten primary decisions for amphibious operation required today by joint doctrine. Operation Chromite is used as an example. 8808A Warfighting from the Sea: Amphibious Operations

  16. 30 CFR 784.11 - Operation plan: General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: General requirements. 784.11... PLAN § 784.11 Operation plan: General requirements. Each application shall contain a description of the... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  17. 30 CFR 780.11 - Operation plan: General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: General requirements. 780.11... PLAN § 780.11 Operation plan: General requirements. Each application shall contain a description of the... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  18. WIPP operations planning: an overview

    International Nuclear Information System (INIS)

    Miskimin, P.A.; Cossel, S.C.; Plung, D.L.

    1985-01-01

    The Waste Isolation Pilot Plant (WIPP) is the first-of-a-kind facility for emplacement of radioactive waste in a geologic repository. The concern for safe and efficient operations - coupled with the domestic and international significance of this project - necessitates that WIPP be a ''model plant.'' To develop WIPP as a model plant, a unique planning methodology was employed to identify, evaluate, incorporate, and implement these elements that together will form the best possible overall operation. The resulting improvements in communication among project participants and the smooth transition being made from construction are equally attributable to the methodology employed and the operating program plan developed. 1 fig

  19. A distributed planning concept for Space Station payload operations

    Science.gov (United States)

    Hagopian, Jeff; Maxwell, Theresa; Reed, Tracey

    1994-01-01

    The complex and diverse nature of the payload operations to be performed on the Space Station requires a robust and flexible planning approach. The planning approach for Space Station payload operations must support the phased development of the Space Station, as well as the geographically distributed users of the Space Station. To date, the planning approach for manned operations in space has been one of centralized planning to the n-th degree of detail. This approach, while valid for short duration flights, incurs high operations costs and is not conducive to long duration Space Station operations. The Space Station payload operations planning concept must reduce operations costs, accommodate phased station development, support distributed users, and provide flexibility. One way to meet these objectives is to distribute the planning functions across a hierarchy of payload planning organizations based on their particular needs and expertise. This paper presents a planning concept which satisfies all phases of the development of the Space Station (manned Shuttle flights, unmanned Station operations, and permanent manned operations), and the migration from centralized to distributed planning functions. Identified in this paper are the payload planning functions which can be distributed and the process by which these functions are performed.

  20. 7 CFR 1466.9 - EQIP plan of operations.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false EQIP plan of operations. 1466.9 Section 1466.9... OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS ENVIRONMENTAL QUALITY INCENTIVES PROGRAM General Provisions § 1466.9 EQIP plan of operations. (a) All conservation practices in the EQIP plan of...

  1. NASA deep space network operations planning and preparation

    Science.gov (United States)

    Jensen, W. N.

    1982-01-01

    The responsibilities and structural organization of the Operations Planning Group of NASA Deep Space Network (DSN) Operations are outlined. The Operations Planning group establishes an early interface with a user's planning organization to educate the user on DSN capabilities and limitations for deep space tracking support. A team of one or two individuals works through all phases of the spacecraft launch and also provides planning and preparation for specific events such as planetary encounters. Coordinating interface is also provided for nonflight projects such as radio astronomy and VLBI experiments. The group is divided into a Long Range Support Planning element and a Near Term Operations Coordination element.

  2. Interactive orbital proximity operations planning system

    Science.gov (United States)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1990-01-01

    An interactive graphical planning system for on-site planning of proximity operations in the congested multispacecraft environment about the space station is presented. The system shows the astronaut a bird's eye perspective of the space station, the orbital plane, and the co-orbiting spacecraft. The system operates in two operational modes: (1) a viewpoint mode, in which the astronaut is able to move the viewpoint around in the orbital plane to range in on areas of interest; and (2) a trajectory design mode, in which the trajectory is planned. Trajectory design involves the composition of a set of waypoints which result in a fuel-optimal trajectory which satisfies all operational constraints, such as departure and arrival constraints, plume impingement constraints, and structural constraints. The main purpose of the system is to present the trajectory and the constraints in an easily interpretable graphical format. Through a graphical interactive process, the trajectory waypoints are edited until all operational constraints are satisfied. A series of experiments was conducted to evaluate the system. Eight airline pilots with no prior background in orbital mechanics participated in the experiments. Subject training included a stand-alone training session of about 6 hours duration, in which the subjects became familiar with orbital mechanics concepts and performed a series of exercises to familiarize themselves with the control and display features of the system. They then carried out a series of production runs in which 90 different trajectory design situations were randomly addressed. The purpose of these experiments was to investigate how the planning time, planning efforts, and fuel expenditures were affected by the planning difficulty. Some results of these experiments are presented.

  3. Astrophysics science operations - Near-term plans and vision

    Science.gov (United States)

    Riegler, Guenter R.

    1991-01-01

    Astrophysics science operations planned by the Science Operations branch of NASA Astrophysics Division for the 1990s for the purpose of gathering spaceborne astronomical data are described. The paper describes the near-future plans of the Science Operations in the areas of the preparation of the proposal; the planning and execution of spaceborne observations; the collection, processing, and analysis data; and the dissemination of results. Also presented are concepts planned for introduction at the beginning of the 20th century, including the concepts of open communications, transparent instrument and observatory operations, a spiral requirements development method, and an automated research assistant.

  4. System Planning With The Hanford Waste Operations Simulator

    International Nuclear Information System (INIS)

    Crawford, T.W.; Certa, P.J.; Wells, M.N.

    2010-01-01

    At the U. S. Department of Energy's Hanford Site in southeastern Washington State, 216 million liters (57 million gallons) of nuclear waste is currently stored in aging underground tanks, threatening the Columbia River. The River Protection Project (RPP), a fully integrated system of waste storage, retrieval, treatment, and disposal facilities, is in varying stages of design, construction, operation, and future planning. These facilities face many overlapping technical, regulatory, and financial hurdles to achieve site cleanup and closure. Program execution is ongoing, but completion is currently expected to take approximately 40 more years. Strategic planning for the treatment of Hanford tank waste is by nature a multi-faceted, complex and iterative process. To help manage the planning, a report referred to as the RPP System Plan is prepared to provide a basis for aligning the program scope with the cost and schedule, from upper-tier contracts to individual facility operating plans. The Hanford Tank Waste Operations Simulator (HTWOS), a dynamic flowsheet simulation and mass balance computer model, is used to simulate the current planned RPP mission, evaluate the impacts of changes to the mission, and assist in planning near-term facility operations. Development of additional modeling tools, including an operations research model and a cost model, will further improve long-term planning confidence. The most recent RPP System Plan, Revision 4, was published in September 2009.

  5. Integrated formal operations plan

    Energy Technology Data Exchange (ETDEWEB)

    Cort, G.; Dearholt, W.; Donahue, S.; Frank, J.; Perkins, B.; Tyler, R.; Wrye, J.

    1994-01-05

    The concept of formal operations (that is, a collection of business practices to assure effective, accountable operations) has vexed the Laboratory for many years. To date most attempts at developing such programs have been based upon rigid, compliance-based interpretations of a veritable mountain of Department of Energy (DOE) orders, directives, notices, and standards. These DOE dictates seldom take the broad view but focus on highly specialized programs isolated from the overall context of formal operations. The result is a confusing array of specific, and often contradictory, requirements that produce a patchwork of overlapping niche programs. This unnecessary duplication wastes precious resources, dramatically increases the complexity of our work processes, and communicates a sense of confusion to our customers and regulators. Coupled with the artificial divisions that have historically existed among the Laboratory`s formal operations organizations (quality assurance, configuration management, records management, training, etc.), this approach has produced layers of increasingly vague and complex formal operations plans, each of which interprets its parent and adds additional requirements of its own. Organizational gridlock ensues whenever an activity attempts to implement these bureaucratic monstrosities. The integrated formal operations plan presented is to establish a set of requirements that must be met by an integrated formal operations program, assign responsibilities for implementation and operation of the program, and specify criteria against which the performance of the program will be measured. The accountable line manager specifies the items, processes, and information (the controlled elements) to which the formal operations program specified applies. The formal operations program is implemented using a graded approach based on the level of importance of the various controlled elements and the scope of the activities in which they are involved.

  6. 14 CFR 136.13 - Helicopter performance plan and operations.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Helicopter performance plan and operations... Helicopter performance plan and operations. (a) Each operator must complete a performance plan before each helicopter commercial air tour, or flight operated under 14 CFR 91.146 or 91.147. The pilot in command must...

  7. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  8. Test, Control and Monitor System (TCMS) operations plan

    Science.gov (United States)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  9. Runway Operations Planning: A Two-Stage Solution Methodology

    Science.gov (United States)

    Anagnostakis, Ioannis; Clarke, John-Paul

    2003-01-01

    The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. Thus, Runway Operations Planning (ROP) is a critical component of airport operations planning in general and surface operations planning in particular. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, may be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. Generating optimal runway operations plans was approached in with a 'one-stage' optimization routine that considered all the desired objectives and constraints, and the characteristics of each aircraft (weight class, destination, Air Traffic Control (ATC) constraints) at the same time. Since, however, at any given point in time, there is less uncertainty in the predicted demand for departure resources in terms of weight class than in terms of specific aircraft, the ROP problem can be parsed into two stages. In the context of the Departure Planner (OP) research project, this paper introduces Runway Operations Planning (ROP) as part of the wider Surface Operations Optimization (SOO) and describes a proposed 'two stage' heuristic algorithm for solving the Runway Operations Planning (ROP) problem. Focus is specifically given on including runway crossings in the planning process of runway operations. In the first stage, sequences of departure class slots and runwy crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the

  10. Kennedy Space Center Orion Processing Team Planning for Ground Operations

    Science.gov (United States)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    Topics in this presentation are: Constellation Ares I/Orion/Ground Ops Elements Orion Ground Operations Flow Orion Operations Planning Process and Toolset Overview, including: 1 Orion Concept of Operations by Phase 2 Ops Analysis Capabilities Overview 3 Operations Planning Evolution 4 Functional Flow Block Diagrams 5 Operations Timeline Development 6 Discrete Event Simulation (DES) Modeling 7 Ground Operations Planning Document Database (GOPDb) Using Operations Planning Tools for Operability Improvements includes: 1 Kaizen/Lean Events 2 Mockups 3 Human Factors Analysis

  11. 77 FR 8751 - Guidance for Decommissioning Planning During Operations

    Science.gov (United States)

    2012-02-15

    ..., 40, 50, 70, and 72 [NRC-2011-0286] Guidance for Decommissioning Planning During Operations AGENCY... Guide, DG-4014, ``Decommissioning Planning During Operations'' in the Federal Register with a public... Guide DG-4014, ``Decommissioning Planning During Operations.'' This DG refers to NUREG-1757 Volume 3...

  12. 10 CFR 436.102 - General operations plan format and content.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false General operations plan format and content. 436.102... PROGRAMS Guidelines for General Operations Plans § 436.102 General operations plan format and content. (a... effective date of these guidelines, a general operations 10-year plan which shall consist of two parts, an...

  13. Hazardous waste operational plan for site 300

    International Nuclear Information System (INIS)

    Roberts, R.S.

    1982-01-01

    This plan outlines the procedures and operations used at LLNL's Site 300 for the management of the hazardous waste generated. This waste consists primarily of depleted uranium (a by-product of U-235 enrichment), beryllium, small quantities of analytical chemicals, industrial type waste such as solvents, cleaning acids, photographic chemicals, etc., and explosives. This plan details the operations generating this waste, the proper handling of this material and the procedures used to treat or dispose of the hazardous waste. A considerable amount of information found in this plan was extracted from the Site 300 Safety and Operational Manual written by Site 300 Facility personnel and the Hazards Control Department

  14. 7 CFR 1465.6 - AMA plan of operations.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false AMA plan of operations. 1465.6 Section 1465.6... OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS AGRICULTURAL MANAGEMENT ASSISTANCE General Provisions § 1465.6 AMA plan of operations. (a) All conservation practices in the APO must be approved by...

  15. Operations planning for Space Station Freedom - And beyond

    Science.gov (United States)

    Gibson, Stephen S.; Martin, Thomas E.; Durham, H. J.

    1992-01-01

    The potential of automated planning and electronic execution systems for enhancing operations on board Space Station Freedom (SSF) are discussed. To exploit this potential the Operations Planning and Scheduling Subsystem is being developed at the NASA Johnson Space Center. Such systems may also make valuable contributions to the operation of resource-constrained, long-duration space habitats of the future. Points that should be considered during the design of future long-duration manned space missions are discussed. Early development of a detailed operations concept as an end-to-end mission description offers a basis for iterative design evaluation, refinement, and option comparison, particularly when used with an advanced operations planning system capable of modeling the operations and resource constraints of the proposed designs.

  16. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  17. Automated Planning and Scheduling for Planetary Rover Distributed Operations

    Science.gov (United States)

    Backes, Paul G.; Rabideau, Gregg; Tso, Kam S.; Chien, Steve

    1999-01-01

    Automated planning and Scheduling, including automated path planning, has been integrated with an Internet-based distributed operations system for planetary rover operations. The resulting prototype system enables faster generation of valid rover command sequences by a distributed planetary rover operations team. The Web Interface for Telescience (WITS) provides Internet-based distributed collaboration, the Automated Scheduling and Planning Environment (ASPEN) provides automated planning and scheduling, and an automated path planner provided path planning. The system was demonstrated on the Rocky 7 research rover at JPL.

  18. Planning in the Continuous Operations Environment of the International Space Station

    Science.gov (United States)

    Maxwell, Theresa; Hagopian, Jeff

    1996-01-01

    The continuous operation planning approach developed for the operations planning of the International Space Station (ISS) is reported on. The approach was designed to be a robust and cost-effective method. It separates ISS planning into two planning functions: long-range planning for a fixed length planning horizon which continually moves forward as ISS operations progress, and short-range planning which takes a small segment of the long-range plan and develops a detailed operations schedule. The continuous approach is compared with the incremental approach, the short and long-range planning functions are described, and the benefits and challenges of implementing a continuous operations planning approach for the ISS are summarized.

  19. Spent Nuclear Fuel (SNF) Startup Plan to Operations

    International Nuclear Information System (INIS)

    GREGORY, J.R.

    2000-01-01

    This plan defines the approach that will be used to ensure the transition from initial startup to normal operations of the SNF operations--are performed in a safe, controlled, and deliberate manner. It provides a phased approach that bridges the operations between the completion of the ORR and the return to normal operations. This plan includes management oversight and administrative controls to be implemented and then reduced in a controlled manner until normal operations are authorized by SNF Management

  20. Emergency planning and operating experience

    International Nuclear Information System (INIS)

    Halpern, O.; Breniere, J.

    1984-01-01

    The purpose of this paper is to derive lessons from operating experience for the planning of emergency measures. This operating experience has two facets: it is obtained not only from the various incidents and accidents which have occurred in countries with nuclear power programmes and from the resulting application of emergency plans but also from the different exercises and simulations carried out in France and in other countries. Experience generally confirms the main approaches selected for emergency plans. The lessons to be derived are of three types: first, it appears necessary to set forth precisely the responsibilities of each person involved in order to prevent a watering-down of decisions in the event of an accident; secondly, considerable improvements need to be made in the different communication networks to be used; and thirdly, small accidents with minor radiological consequences deserve as systematic and thorough an approach as large and more improbable accidents. (author)

  1. The SNL/NM Classified Waste Landfill Excavation: Lessons Learned Moving from Planning to Implementation

    International Nuclear Information System (INIS)

    Galloway, Robert B; Slavin, Paula

    1999-01-01

    The Sandia National Laboratories/New Mexico (SNL/NM) Environmental Restoration Project is halfway through excavating the Classified Waste Landfill in Technical Area II, a disposal area for weapon components for approximately 40 years. While the planning phase of any project is important, it is only a means of getting to the field implementation phase where reality quickly sinks in. Documents outlining the general processes are developed, heavy equipment, supply needs, requisite skills, and staffing levels are anticipated, and contingencies for waste management are put in place. However, the nature of landfill excavation dictates that even the most detailed plans will probably change. This project is proving that trying to account for undefined variables and predicting the total cost of landfill remediation is very difficult if the contents are not well known. In landfill excavation, contingency cannot be minimized. During development of the waste management plan, it was recognized that even the best forecasting could not formulate the perfect cradle-to-grave processes because waste streams are rarely definable before excavation begins. Typically, as excavation progresses and waste streams are generated, new characterization information allows further definition of disposal options which, in turn, modify the generation/management process. A general plan combined with close involvement of waste management personnel to resolve characterization and packaging questions during generation has worked very well. And, as expected, each new pit excavated creates new waste management challenges. The material excavated consists primarily of classified weapon assemblies and related components, so disposition must include demilitarization and sanitization. The demilitarization task at the start of the project was provided by an SNL/NM group that has since lost their funding and operational capability. This project is having to take on the task of disassembly, destruction, and

  2. Operations and maintenance plans for the TFTR

    International Nuclear Information System (INIS)

    Allen, H.L.; Fedor, B.J.

    1978-01-01

    Princeton University Plasma Physics Laboratory (PPPL) is constructing a Tokamak Fusion Test Reactor (TFTR) scheduled to begin operation for fusion research experiments in late 1981, first with hydrogen and deuterium plasmas and later, in the second phase, using tritium for high power fusion studies. This latter mode will introduce considerable complexity to operation and maintenance of the TFTR in terms of meeting requirements for tritium handling, adequate radiation shielding, and corrective and preventive maintenance procedures. In this paper we discuss plans for the installation and preoperational testing of the major subsystems of TFTR, proposed start-up and operating scenarios for the device and the system of operational control. In addition, the TFTR Maintenance Plan and related procedures for specific major maintenance tasks are described, including the use of remote handling equipment and remote manipulators. Each of these topics is addressed in terms of the current status of planning and development

  3. Internal operating plan (P.O.I.)

    International Nuclear Information System (INIS)

    2002-01-01

    This article presents the POI (internal operating plan) which defines the management measures, the intervention methods and the required means that the operator must implement to protect the personnel, the population and the environment. (A.L.B.)

  4. Dealing with Uncertainty in Operational Transport Planning

    NARCIS (Netherlands)

    Zutt, J.; Van Gemund, A.J.C.; De Weerdt, M.M.; Witteveen, C.

    2010-01-01

    An important problem in transportation is how to ensure efficient operational route planning when several vehicles share a common road infrastructure with limited capacity. Examples of such a problem are route planning for automated guided vehicles in a terminal and route planning for aircraft

  5. Spent Nuclear Fuel Project operational staffing plan

    International Nuclear Information System (INIS)

    Debban, B.L.

    1996-03-01

    Using the Spent Nuclear Fuel (SNF) Project's current process flow concepts and knowledge from cognizant engineering and operational personnel, an initial assessment of the SNF Project radiological exposure and resource requirements was completed. A small project team completed a step by step analysis of fuel movement in the K Basins to the new interim storage location, the Canister Storage Building (CSB). This analysis looked at fuel retrieval, conditioning of the fuel, and transportation of the fuel. This plan describes the staffing structure for fuel processing, fuel movement, and the maintenance and operation (M ampersand O) staffing requirements of the facilities. This initial draft does not identify the support function resources required for M ampersand O, i.e., administrative and engineering (technical support). These will be included in future revisions to the plan. This plan looks at the resource requirements for the SNF subprojects, specifically, the operations of the facilities, balances resources where applicable, rotates crews where applicable, and attempts to use individuals in multi-task assignments. This plan does not apply to the construction phase of planned projects that affect staffing levels of K Basins

  6. ISS Payload Operations: The Need for and Benefit of Responsive Planning

    Science.gov (United States)

    Nahay, Ed; Boster, Mandee

    2000-01-01

    International Space Station (ISS) payload operations are controlled through implementation of a payload operations plan. This plan, which represents the defined approach to payload operations in general, can vary in terms of level of definition. The detailed plan provides the specific sequence and timing of each component of a payload's operations. Such an approach to planning was implemented in the Spacelab program. The responsive plan provides a flexible approach to payload operations through generalization. A responsive approach to planning was implemented in the NASA/Mir Phase 1 program, and was identified as a need during the Skylab program. The current approach to ISS payload operations planning and control tends toward detailed planning, rather than responsive planning. The use of detailed plans provides for the efficient use of limited resources onboard the ISS. It restricts flexibility in payload operations, which is inconsistent with the dynamic nature of the ISS science program, and it restricts crew desires for flexibility and autonomy. Also, detailed planning is manpower intensive. The development and implementation of a responsive plan provides for a more dynamic, more accommodating, and less manpower intensive approach to planning. The science program becomes more dynamic and responsive as the plan provides flexibility to accommodate real-time science accomplishments. Communications limitations and the crew desire for flexibility and autonomy in plan implementation are readily accommodated with responsive planning. Manpower efficiencies are accomplished through a reduction in requirements collection and coordination, plan development, and maintenance. Through examples and assessments, this paper identifies the need to transition from detailed to responsive plans for ISS payload operations. Examples depict specific characteristics of the plans. Assessments identify the following: the means by which responsive plans accommodate the dynamic nature of

  7. The HAL 9000 Space Operating System Real-Time Planning Engine Design and Operations Requirements

    Science.gov (United States)

    Stetson, Howard; Watson, Michael D.; Shaughnessy, Ray

    2012-01-01

    In support of future deep space manned missions, an autonomous/automated vehicle, providing crew autonomy and an autonomous response planning system, will be required due to the light time delays in communication. Vehicle capabilities as a whole must provide for tactical response to vehicle system failures and space environmental effects induced failures, for risk mitigation of permanent loss of communication with Earth, and for assured crew return capabilities. The complexity of human rated space systems and the limited crew sizes and crew skills mix drive the need for a robust autonomous capability on-board the vehicle. The HAL 9000 Space Operating System[2] designed for such missions and space craft includes the first distributed real-time planning / re-planning system. This paper will detail the software architecture of the multiple planning engine system, and the interface design for plan changes, approval and implementation that is performed autonomously. Operations scenarios will be defined for analysis of the planning engines operations and its requirements for nominal / off nominal activities. An assessment of the distributed realtime re-planning system, in the defined operations environment, will be provided as well as findings as it pertains to the vehicle, crew, and mission control requirements needed for implementation.

  8. 36 CFR 223.32 - Timber sale operating plan.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Timber sale operating plan... SALE AND DISPOSAL OF NATIONAL FOREST SYSTEM TIMBER Timber Sale Contracts Contract Conditions and Provisions § 223.32 Timber sale operating plan. Sale contracts with a term of 2 years or more shall provide...

  9. Operational planning of refineries; Planejamento operacional de refinarias

    Energy Technology Data Exchange (ETDEWEB)

    Sinay, Maria Cristina Fogliatti de [Instituto Militar de Engenharia (IME), Rio de Janeiro, RJ (Brazil); Bueno, Catia [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2004-07-01

    The activities integration that compose the petroleum logistic chain makes more complex its planning which is normally done in a joined level, using operation research models in order to find optimized solutions. When this integrated planning is repassed to the companies and its constitutes parts (mainly refinery) uncertainness are generated about the solution that will be adopted in case of new restrictions appear. Then, the purpose of this work is propose a procedure that is capable to adequate and specifies optimized solutions presented by corporative model to refinery operations, using 'What-if' and deterministic simulation technique with optimization. To achieve this objective will be analysed typical activities in refineries and basic principles to their operational planning. (author)

  10. New heuristics for planning operating rooms.

    NARCIS (Netherlands)

    Molina-Pariente, J.M.; Hans, Elias W.; Framinan, J.M.; Gomez-Cia, T.

    2015-01-01

    We tackle the operating room planning problem of the Plastic Surgery and Major Burns Specialty of the University Hospital “Virgen del Rocio” in Seville (Spain). The decision problem is to assign an intervention date and an operating room to a set of surgeries on the waiting list, minimizing access

  11. 77 FR 14047 - Guidance for Decommissioning Planning During Operations

    Science.gov (United States)

    2012-03-08

    ...)-4014, ``Decommissioning Planning During Operations.'' This action is necessary to correct the NRC's... NUCLEAR REGULATORY COMMISSION [NRC-2011-0286] Guidance for Decommissioning Planning During Operations AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; correction. SUMMARY: The U...

  12. Operating Theatre Planning and Scheduling.

    NARCIS (Netherlands)

    Hans, Elias W.; Vanberkel, P.T.; Hall, R.

    2012-01-01

    In this chapter we present a number of approaches to operating theatre planning and scheduling. We organize these approaches hierarchically which serves to illustrate the breadth of problems confronted by researchers. At each hierarchicalplanning level we describe common problems, solution

  13. Integrated operations plan for the MFTF-B Mirror Fusion Test Facility. Volume I. Organization plan

    International Nuclear Information System (INIS)

    1981-12-01

    This plan and the accompanying MFTF-B Integrated Operations Plan are submitted in response to UC/LLNL Purchase Order 3883801, dated July 1981. The organization plan also addresses the specific tasks and trade studies directed by the scope of work. The Integrated Operations Plan, which includes a reliability, quality assurance, and safety plan and an integrated logistics plan, comprises the burden of the report. In the first section of this volume, certain underlying assumptions and observations are discussed setting the requirements and limits for organization. Section B presents the recommended structure itself. Section C Device Availability vs Maintenance and Support Efforts and Section D Staffing Levels and Skills provide backup detail and justification. Section E is a trade study on maintenance and support by LLNL staff vs subcontract and Section F is a plan for transitioning from the construction phase into operation. A brief summary of schedules and estimated costs concludes the volume

  14. LANL continuity of operations plan

    Energy Technology Data Exchange (ETDEWEB)

    Senutovitch, Diane M [Los Alamos National Laboratory

    2010-12-22

    The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratory EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may

  15. Rolling schedule approaches for supply chain operations planning

    NARCIS (Netherlands)

    Spitter, J.M.

    2005-01-01

    Supply Chain Operations Planning (SCOP) involves the determination of an extensive production plan for a network of manufacturing and distribution entities within and across organizations. The production plan consist of order release decisions that allocate materials and resources in order to

  16. Spacelab operations planning. [ground handling, launch, flight and experiments

    Science.gov (United States)

    Lee, T. J.

    1976-01-01

    The paper reviews NASA planning in the fields of ground, launch and flight operations and experiment integration to effectively operate Spacelab. Payload mission planning is discussed taking consideration of orbital analysis and the mission of a multiuser payload which may be either single or multidiscipline. Payload analytical integration - as active process of analyses to ensure that the experiment payload is compatible to the mission objectives and profile ground and flight operations and that the resource demands upon Spacelab can be satisfied - is considered. Software integration is touched upon and the major integration levels in ground operational processing of Spacelab and its experimental payloads are examined. Flight operations, encompassing the operation of the Space Transportation System and the payload, are discussed as are the initial Spacelab missions. Charts and diagrams are presented illustrating the various planning areas.

  17. Monitoring Lalu Lintas Jaringan Demilitarized Zone Universitas Negeri Jakarta Menggunakan Sensor Packet Sniffer Pada PRTG Network Monitor

    Directory of Open Access Journals (Sweden)

    M. Ficky Duskarnaen

    2017-06-01

    Full Text Available Universitas Negeri Jakarta mendapat pemberitahuan bahwa server yang berada pada jaringan UNJ melakukan serangan ke server milik NETpilot GmbH pada layanan postfix. Sementara itu jaringan tempat server tersebut berada belum terdapat sistem yang dapat memantau lalu lintas jaringan yang terjadi. Penelitian ini bertujuan untuk melakukan monitoring lalu lintas jaringan pada jaringan Demilitarized Zone Universitas Negeri Jakarta. Penelitian yang dilakukan di Laboratorium Komputer Jurusan Teknik Elektro dan Pustikom (Pusat Teknologi Informasi dan Komputer Universitas Negeri Jakarta pada bulan April sampai dengan Juni 2014 menggunakan metode eksperimen. Dari hasil monitoring tersebut diketahui terdapat server dengan alamat IP 192.168.XXX.XXX menghasilkan lalu lintas data yang sangat besar, beberapa koneksi yang berasal dari server dengan alamat IP 192.168.XXX.XXX memiliki destination port 10026 yang merupakan port default dari salah satu layanan yang diberikan oleh aplikasi postfix. Sehingga kesimpulannya, monitoring lalu lintas jaringan menggunakan sensor Packet Sniffer pada PRTG Network monitor telah dapat menghasilkan laporan lalu lintas data yang terjadi pada jaringan DMZ UNJ setiap hari dan hasil monitoring tersebut dapat digunakan untuk membantu menyelesaikan masalah yang terjadi pada jaringan.

  18. Disruption management - operations research between planning and execution

    DEFF Research Database (Denmark)

    Clausen, Jens; Larsen, Jesper; Larsen, Allan

    2001-01-01

    For a large number of applications Operations Research has a proven track record: it can deliver high quality solutions for planning problems. Important examples can be found in the airline industry, logistics and production management. This report will describe real-world examples of a novel way...... of applying Operations Research: As plans have to be adjusted to take last minute changes into consideration, OR can play an active role in such a situation by producing, maybe even in a pro-actively role, alternative plans. This type of activity is called Disruption Management....

  19. Approach to operational mine planning: Case study Tamnava West

    Directory of Open Access Journals (Sweden)

    Stevanović Dejan R.

    2014-01-01

    Full Text Available In contemporary mining industry is very difficult to achieve production targets and profit without investing effort in detailed excavation planning. It is especially true for deposits with complex geological structure and production technology, as is the case for many coal mines in Serbia. The majority of coal production is used for generation of electricity in power plant. This fact is the main reason why production objectives of coal mine and power plant are strongly connected. Due to the fluctuation of the coal quality, operational mine planning (as a part of coal homogenization process, is of critical importance for managing successful coal quality control and meeting criteria of power plant. This paper investigates advantage of proper operational planning on coal quality control process and overall production performance. For better understanding case study is conducted on open pit Tamnava West field. Successful operational mine planning is almost impossible without use of modern software packages. For that reason in presented case study operational mine planning is done with Minex software.

  20. ICD Complex Operations and Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  1. Operations Program Plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1990-09-01

    This document, Revision 4 of the Operations Program Plan, has been developed as the seven-year master plan for operating of the Waste Isolation Pilot Plant (WIPP). Subjects covered include public and technical communications; regulatory and environmental programs; startup engineering; radiation handling, surface operations, and underground operations; waste certification and waste handling; transportation development; geotechnical engineering; experimental operations; engineering program; general maintenance; security program; safety, radiation, and regulatory assurance; quality assurance program; training program; administration activities; management systems program; and decommissioning. 243 refs., 19 figs., 25 tabs. (SM)

  2. Seroprevalence of Toxoplasmosis Detected by RDT in Residents near the DMZ (demilitarized zone) of Cheorwon-gun, Gangwon-do, Korea.

    Science.gov (United States)

    Kim, Yeong Hoon; Lee, Jihoo; Kim, Young-Eun; Ahn, Seongkyu; Kim, Tong-Soo; Hong, Sung-Jong; Chong, Chom-Kyu; Ahn, Hye-Jin; Nam, Ho-Woo

    2017-08-01

    Seroprevalence of Toxoplasma gondii infection among the residents of Cheorwon-gun, Gangwon-do, Korea, which partly includes the demilitarized zone (DMZ), were surveyed for 4 years and evaluated by RDT using recombinant fragment of major surface antigen (SAG1A). Sera from 1336, 583, 526, and 583 adult residents were collected on a yearly basis from 2010 to 2013, respectively. The total positive seroprevalence was 19.3, 21.9, 23.4, and 26.8% from 2010 to 2013, respectively. The positive seroprevalence in men (23.6, 27.5, 29.5, 34.6%) was far higher than women (14.1, 18.3, 19.4, 21.4%), from 2010 to 2013, respectively. This high seroprevalence of toxoplasmosis in Cheorwon-gun may have been influenced in part by its geographical locality of the area as it includes the DMZ, where civilian access is strictly limited, thus creating a relatively isolated area that is a well-preserved habitat. Further research is necessary to study the epidemiology of toxoplasmosis in this area.

  3. Can statisticians beat surgeons at the planning of operations?

    NARCIS (Netherlands)

    Joustra, Paul; Meester, Reinier; van Ophem, Hans

    2013-01-01

    The planning of operations in the Academic Medical Center is primarily based on the assessments of the length of the operation by the surgeons. We investigate whether duration models employing the information available at the moment the planning is made, offer a better alternative. Our empirical

  4. Can statisticians beat surgeons at the planning of operations?

    NARCIS (Netherlands)

    Joustra, P.; Meester, R.; van Ophem, H.

    2011-01-01

    The planning of operations in the Academic Medical Center is primarily based on the assessments of the length of the operation by the surgeons. We investigate whether duration models employing the information available at the moment the planning is made, offer a better alternative. Our empirical

  5. A Framework to Support the Fusion of Operation and Planning

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Yousu; Etingov, Pavel V.; Fitzhenry, Erin B.; Sharma, Poorva; Nguyen, Tony B.; Makarov, Yuri V.; Rice, Mark J.; Allwardt, Craig H.; Widergren, Steven E.

    2015-12-31

    The management of the nation’s power system has progressed to the point where the boundary lines between operations and planning are becoming blurred. The dynamic behavior of smart grid technologies brings pressures of incorporating the predictive capability from planning to enhance operations. These needs are requiring a smoother, better integrated interplay between the functional roles of planning and operations. This paper presents a framework to support the fusion of operation and planning. A case study of predicting the intra-hour deficiency in generation capability and ramping capacity and presenting the outputs to operators was conducted. The study shows the benefits of the fusion and the effectiveness of the framework. All the function blocks used in the study were built upon GridOPTICS Software System (GOSS), a software system middleware platform that facilitates deployment of new applications for the future power grid.

  6. Decommissioning Planning during the Operation of the Loviisa NPP. Planning, Management and Organizational Aspects

    Energy Technology Data Exchange (ETDEWEB)

    Tuunanen, J. P.; Eurajoki, T. E.E., [Fortum Power and Heat Ltd, Nuclear Waste Espoo (Finland)

    2013-08-15

    The first decommissioning plan for Loviisa nuclear power plant was written already in 1980's, when the plant had just started operation. The plan has been updated in 5-6 years intervals and this work still continues towards the final decommissioning plan. The decommissioning plan is based on immediate dismantling option and final disposal of decommissioning waste to the extension of the on site final disposal facility for low and intermediate level waste. The decommissioning planning has been organized as an independent project, which is realised in close cooperation with Fortum's research programme on radioactive waste management. The plant personnel are involved in the planning work through providing operating experience on contamination and activation of systems, structures and components. Later in the decommissioning phase the plant personnel will form the main part of the decommissioning organization. (author)

  7. An innovative approach to capability-based emergency operations planning.

    Science.gov (United States)

    Keim, Mark E

    2013-01-01

    This paper describes the innovative use information technology for assisting disaster planners with an easily-accessible method for writing and improving evidence-based emergency operations plans. This process is used to identify all key objectives of the emergency response according to capabilities of the institution, community or society. The approach then uses a standardized, objective-based format, along with a consensus-based method for drafting capability-based operational-level plans. This information is then integrated within a relational database to allow for ease of access and enhanced functionality to search, sort and filter and emergency operations plan according to user need and technological capacity. This integrated approach is offered as an effective option for integrating best practices of planning with the efficiency, scalability and flexibility of modern information and communication technology.

  8. 7 CFR 623.13 - Wetlands reserve plan of operations.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Wetlands reserve plan of operations. 623.13 Section... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE WATER RESOURCES EMERGENCY WETLANDS RESERVE PROGRAM § 623.13 Wetlands reserve plan of operations. (a) After NRCS has accepted the applicant for enrollment in the...

  9. A compilation of necessary elements for a local government continuity of operations plan

    OpenAIRE

    Cashen, Kevin M.

    2006-01-01

    CHDS State/Local National and state homeland security strategies call for continuity of operations plan development. The 2006 Nationwide Plan Review Phase II Report identifies continuity of operations plan development as a state and local goal with a federal goal of providing continuity of operations plan development support. Most local governments do not have a continuity of operation plan or it needs to be updated. Continuity of operations plan guidance is provided by a variety of intern...

  10. Multi Sector Planning Tools for Trajectory-Based Operations

    Science.gov (United States)

    Prevot, Thomas; Mainini, Matthew; Brasil, Connie

    2010-01-01

    This paper discusses a suite of multi sector planning tools for trajectory-based operations that were developed and evaluated in the Airspace Operations Laboratory (AOL) at the NASA Ames Research Center. The toolset included tools for traffic load and complexity assessment as well as trajectory planning and coordination. The situation assessment tools included an integrated suite of interactive traffic displays, load tables, load graphs, and dynamic aircraft filters. The planning toolset allowed for single and multi aircraft trajectory planning and data communication-based coordination of trajectories between operators. Also newly introduced was a real-time computation of sector complexity into the toolset that operators could use in lieu of aircraft count to better estimate and manage sector workload, especially in situations with convective weather. The tools were used during a joint NASA/FAA multi sector planner simulation in the AOL in 2009 that had multiple objectives with the assessment of the effectiveness of the tools being one of them. Current air traffic control operators who were experienced as area supervisors and traffic management coordinators used the tools throughout the simulation and provided their usefulness and usability ratings in post simulation questionnaires. This paper presents these subjective assessments as well as the actual usage data that was collected during the simulation. The toolset was rated very useful and usable overall. Many elements received high scores by the operators and were used frequently and successfully. Other functions were not used at all, but various requests for new functions and capabilities were received that could be added to the toolset.

  11. 30 CFR 285.620 - What is a Construction and Operations Plan (COP)?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What is a Construction and Operations Plan (COP... Information Requirements Construction and Operations Plan for Commercial Leases § 285.620 What is a Construction and Operations Plan (COP)? The COP describes your construction, operations, and conceptual...

  12. Knowledge-Based operation planning system for boiling water reactors

    International Nuclear Information System (INIS)

    Tatsuya Iwamoto; Shungo Sakurai; Hitoshi Uematsu; Makoto Tsuiki

    1987-01-01

    A knowledge-Based Boiling Water Reactor operation planning system was developed to support core operators or core management engineers in making core operation plans, by automatically generating suboptimum core operation procedures. The procedures are obtained by searching a branching tree of the possible core status (nodes) and the elementary operations to change the core status (branches). A path that ends at the target node, and contains only operationally feasible nodes can be a candidate of the solution. The core eigenvalue, the power distribution and the thermal limit parameters at key points are calculated by running a three-dimensional (3-D) BWR core physics simulator to examine the feasibility of the nodes and the performance of candidates. To obtain a practically acceptable solution within a reasonable time rather than making a time-consuming effort to get the optimum one, the Depth-First-Search method, together with the heuristic branch-bounding, was used to search the branching tree. The system was applied to actual operation plannings with real plant data, and gave satisfactory results. It can be concluded that the system can be applied to generate core operation procedures as a substitute for core management experts

  13. 30 CFR 250.290 - What operations require approval of the Conceptual Plan?

    Science.gov (United States)

    2010-07-01

    ... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Plans and Information Deepwater Operations Plans (dwop) § 250.290 What operations require approval of the Conceptual Plan? You may... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What operations require approval of the...

  14. A novel flavivirus detected in two Aedes spp. collected near the demilitarized zone of the Republic of Korea.

    Science.gov (United States)

    Korkusol, Achareeya; Takhampunya, Ratree; Hang, Jun; Jarman, Richard G; Tippayachai, Bousaraporn; Kim, Heung-Chul; Chong, Sung-Tae; Davidson, Silas A; Klein, Terry A

    2017-05-01

    Flaviviruses comprise a large and diverse group of positive-stranded RNA viruses, including tick-, mosquito- and unknown-vector-borne flaviviruses. A novel flavivirus was detected in pools of Aedes vexans nipponii (n=1) and Aedes esoensis (n=3) collected in 2012 and 2013 near the demilitarized zone (DMZ), Republic of Korea (ROK). Phylogenetic analyses of the NS5, E gene and complete polyprotein coding sequence (CDS) showed that the novel virus fell within the Aedes-borne flaviviruses (ABFVs), with nucleotide identity ranging from 57.8-75.1 %, 46.1-74.2 % and 51.1-76.2 %, respectively. While the novel ABFV was distant from other flaviviruses within the group, it formed a clade with Ilomantsi virus (ILOV). Sequence alignments of the partial NS5 gene, full-length E gene and polyprotein CDS between the novel virus and ILOV showed approximately 76.2 % nucleotide identity and 90 % amino acid identity, respectively. The ABFV identified in Aedes mosquitoes from the ROK is a novel ABFV based on the sequence analyses and is designated as Panmunjeom flavivirus (PANFV).

  15. Ra reactor operation plan for 1976 - Annex 6

    International Nuclear Information System (INIS)

    Martinc, R.

    1976-01-01

    Contrary to previous years the RA reactor operation plan for 1976 is conditioned by more uncertainties than ever for the following reasons. It is planned for February to repair the components in order to eliminate the consequences of leaking from the vertical experimental channel VK-4 which happened in december 1975. Apart from this, measurements related to transfer of the core to highly enriched fuel under minimum power are foreseen to be performed in February. In April, it would be indispensable to locate the point of He gas leaking and its prevention. Core transfer to highly enriched fuel is planned for April for testing of the fuel elements under operating conditions and step by step increase of the power density up to the nominal power. Complete plan for core transfer would be available by the end of February 1976. It is planned to make-up for the mentioned delays from May-December 1976 [sr

  16. Operations and maintenance plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2014-01-01

    This Operations and Maintenance (O&M) Plan describes how the Integrated Corridor Management System (ICMS) will be used in daily transportation operations and maintenance activities. The Plan addresses the activities needed to effectively operate the ...

  17. Collaborative planning of operations in industrial symbiosis

    DEFF Research Database (Denmark)

    Herczeg, Gabor; Akkerman, Renzo

    2014-01-01

    Industrial symbiosis (IS) is cooperation between companies to achieve collective benefits by supplying and reusing industrial waste to substitute virgin resources in production. In this paper, we investigate the IS phenomenon from a supply chain management perspective. We propose a collaborative...... planning model to coordinate master planning of operations of waste suppliers and buyers. Furthermore, we analyze planning decisions related to IS when waste exchange is combined with virgin resource procurement. We demonstrate that conditions of virgin resource procurement affect the economic feasibility...

  18. Sand and gravel mine operations and reclamation planning using microcomputers

    Energy Technology Data Exchange (ETDEWEB)

    Ariffin, J.B.

    1990-02-01

    The purpose of this study is to focus on the application of microcomputers, also known as personal computers, in planning for sand and gravel mine operations and reclamation at a site in Story County, Iowa. This site, called the Arrasmith Pit, is operated by Martin Marietta Aggregates, Inc. The Arrasmith site, which encompasses an area of about 25 acres, is a relatively small site for aggregate mining. However, planning for the concurrent mine operation and reclamation program at this site is just as critical as with larger sites and the planning process is the same.

  19. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  20. Integrating operation design into infrastructure planning to foster robustness of planned water systems

    Science.gov (United States)

    Bertoni, Federica; Giuliani, Matteo; Castelletti, Andrea

    2017-04-01

    Over the past years, many studies have looked at the planning and management of water infrastructure systems as two separate problems, where the dynamic component (i.e., operations) is considered only after the static problem (i.e., planning) has been resolved. Most recent works have started to investigate planning and management as two strictly interconnected faces of the same problem, where the former is solved jointly with the latter in an integrated framework. This brings advantages to multi-purpose water reservoir systems, where several optimal operating strategies exist and similar system designs might perform differently on the long term depending on the considered short-term operating tradeoff. An operationally robust design will be therefore one performing well across multiple feasible tradeoff operating policies. This work aims at studying the interaction between short-term operating strategies and their impacts on long-term structural decisions, when long-lived infrastructures with complex ecological impacts and multi-sectoral demands to satisfy (i.e., reservoirs) are considered. A parametric reinforcement learning approach is adopted for nesting optimization and control yielding to both optimal reservoir design and optimal operational policies for water reservoir systems. The method is demonstrated on a synthetic reservoir that must be designed and operated for ensuring reliable water supply to downstream users. At first, the optimal design capacity derived is compared with the 'no-fail storage' computed through Rippl, a capacity design function that returns the minimum storage needed to satisfy specified water demands without allowing supply shortfall. Then, the optimal reservoir volume is used to simulate the simplified case study under other operating objectives than water supply, in order to assess whether and how the system performance changes. The more robust the infrastructural design, the smaller the difference between the performances of

  1. Web Application Software for Ground Operations Planning Database (GOPDb) Management

    Science.gov (United States)

    Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey

    2013-01-01

    A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.

  2. Distributed Operations Planning

    Science.gov (United States)

    Fox, Jason; Norris, Jeffrey; Powell, Mark; Rabe, Kenneth; Shams, Khawaja

    2007-01-01

    Maestro software provides a secure and distributed mission planning system for long-term missions in general, and the Mars Exploration Rover Mission (MER) specifically. Maestro, the successor to the Science Activity Planner, has a heavy emphasis on portability and distributed operations, and requires no data replication or expensive hardware, instead relying on a set of services functioning on JPL institutional servers. Maestro works on most current computers with network connections, including laptops. When browsing down-link data from a spacecraft, Maestro functions similarly to being on a Web browser. After authenticating the user, it connects to a database server to query an index of data products. It then contacts a Web server to download and display the actual data products. The software also includes collaboration support based upon a highly reliable messaging system. Modifications made to targets in one instance are quickly and securely transmitted to other instances of Maestro. The back end that has been developed for Maestro could benefit many future missions by reducing the cost of centralized operations system architecture.

  3. Guidance system operations plan for manned CM earth orbital missions using program SKYLARK 1. Section 4: Operational modes

    Science.gov (United States)

    Dunbar, J. C.

    1972-01-01

    The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.

  4. 36 CFR 228.4 - Plan of operations-notice of intent-requirements.

    Science.gov (United States)

    2010-07-01

    ... meet the requirements for environmental protection in § 228.8. (d) The plan of operations shall cover... disturbance not covered by the initial plan. (e) At any time during operations under an approved plan of...), resulting in varying degrees of disturbance to vegetative resources, soil, water, air, or wildlife. The...

  5. Electric Vehicle Sharing Planning and Operations

    Science.gov (United States)

    2018-02-01

    Dongfang Zhao (ORCID ID 0000-0002-5424-9915); Xiaopeng (Shaw) Li (ORCID ID 0000-0002-5264-3775); Yu Zhang (ORCID ID 0000-0003-1202-626X) This project includes literature review and proposing a model for EV planning and operations. We first conducted ...

  6. C-Division annual review and operating plan, August 1990

    Energy Technology Data Exchange (ETDEWEB)

    Morse, N.R.

    1990-11-01

    The Computing and Communications Division is responsible for the Laboratory's Integrated Computing Network as well as Laboratory-wide communications. Our computing network, used by 8000 people distributed throughout the nation, constitutes one of the most powerful scientific computing facilities in the world. The purpose of this publication is to inform our clients of our strategic and operating plans. We review major accomplishments since early 1989 and describe our strategic planning goals and specific projects that will guide our operations over the next couple of years. Our mission statement, planning considerations, and management policies and practices are also included.

  7. 30 CFR 250.111 - Who oversees operations under my welding plan?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Who oversees operations under my welding plan... § 250.111 Who oversees operations under my welding plan? A welding supervisor or a designated person in charge must be thoroughly familiar with your welding plan. This person must ensure that each welder is...

  8. Benefits to blood banks of a sales and operations planning process.

    Science.gov (United States)

    Keal, Donald A; Hebert, Phil

    2010-12-01

    A formal sales and operations planning (S&OP) process is a decision making and communication process that balances supply and demand while integrating all business operational components with customer-focused business plans that links high level strategic plans to day-to-day operations. Furthermore, S&OP can assist in managing change across the organization as it provides the opportunity to be proactive in the face of problems and opportunities while establishing a plan for everyone to follow. Some of the key outcomes from a robust S&OP process in blood banking would include: higher customer satisfaction (donors and health care providers), balanced inventory across product lines and customers, more stable production rates and higher productivity, more cooperation across the entire operation, and timely updates to the business plan resulting in better forecasting and fewer surprises that negatively impact the bottom line. © 2010 American Association of Blood Banks.

  9. ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

    Science.gov (United States)

    Hall, Timothy A.

    2011-01-01

    In 2008 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organization to find ways to reduce the costs of International Space station (ISS) console operations in the Mission Control Center (MCC). Each MOD organization was asked to identify projects that would help them attain a goal of a 30% reduction in operating costs by 2012. The MOD Operations and Planning organization responded to this challenge by launching several software automation projects that would allow them to greatly improve ISS console operations and reduce staffing and operating costs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the plan of eliminating two full time ISS console support positions by 2012. This will account for an overall 10 EP reduction in staffing for the Operations and Planning organization. These automation projects focused on utilizing software to automate many administrative and often repetitive tasks involved with processing ISS planning and daily operations information. This information was exchanged between the ground flight control teams in Houston and around the globe, as well as with the ISS astronaut crew. These tasks ranged from managing mission plan changes from around the globe, to uploading and downloading information to and from the ISS crew, to even more complex tasks that required multiple decision points to process the data, track approvals and deliver it to the correct recipient across network and security boundaries. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture between several planning tools; as well as a engaging a previously research level technology (TRL 2-3) developed by Ames Research Center (ARC) that utilized an intelligent agent based system to manage and automate file traffic flow

  10. Lead time anticipation in supply chain operations planning

    NARCIS (Netherlands)

    Jansen, M.M.; Kok, de A.G.; Fransoo, J.C.

    2013-01-01

    Linear programming (LP) models for Supply Chain Operations Planning are widely used in Advanced Planning Systems. The solution to the LP model is a proposal for order releases to the various production units (PU) in the supply network. There is a non-linear relationship between the work-in-process

  11. Use of sales and operations planning in small and medium-sized enterprises

    Directory of Open Access Journals (Sweden)

    Michał Adamczak

    2013-03-01

    Full Text Available Background: Increasing competitiveness in the market, customer expectations related to the shortening of the deadlines and the reduction of prices of products and services force companies to improve the efficiency of internal processes. The integration of planning process is one of possible ways to achieve this aim. The integration of planning processes by the use of SOP model (Sales and Operations Planning is a method to implement this idea. The study allowed to identify ways to implement the process of sales and operations planning in small and medium-sized enterprises. Material and methods: The study was conducted in companies from different industries. The research method was in-depth interviews conducted with managers of companies or persons occupying management positions in the organizational process of implementing sales and operations planning. Results: During the survey, 10 companies were asked about the use of sales and operations planning, its elements and organizational aspects of its development, by the company. Conclusions: The use of sales and operations plan is closely dependent on the size of the company and its localization in the supply chain. Small enterprises are not interested in the integration of the planning process due to the small scale of operations and the centralization of decision-making process. Medium-sized enterprises, due to the increased complexity of the processes of planning, see the benefits of their integration in the SOP model.

  12. [Philanthropic hospitals and the operation of provider-owned health plans in Brazil].

    Science.gov (United States)

    Lima, Sheyla Maria Lemos; Portela, Margareth C; Ugá, Maria Alicia Dominguez; Barbosa, Pedro Ribeiro; Gerschman, Silvia; Vasconcellos, Miguel Murat

    2007-02-01

    To describe the management performance of philanthropic hospitals that operate their own health plans, in comparison with philanthropic hospitals as a whole in Brazil. The managerial structures of philanthropic hospitals that operated their own health plans were compared with those seen in a representative group from the philanthropic hospital sector, in six dimensions: management and planning, economics and finance, human resources, technical services, logistics services and information technology. Data from a random sample of 69 hospitals within the philanthropic hospital sector and 94 philanthropic hospitals that operate their own health plans were evaluated. In both cases, only the hospitals with less than 599 beds were included. The results identified for the hospitals that operate their own health plans were more positive in all the managerial dimensions compared. In particular, the economics and finance and information technology dimensions were highlighted, for which more than 50% of the hospitals that operated their own health plans presented almost all the conditions considered. The philanthropic hospital sector is important in providing services to the Brazilian Health System (SUS). The challenges in maintaining and developing these hospitals impose the need to find alternatives. Stimulation of a public-private partnership in this segment, by means of operating provider-owned health plans or providing services to other health plans that work together with SUS, is a field that deserves more in-depth analysis.

  13. A Practice of Secure Development and Operational Environment Plan

    International Nuclear Information System (INIS)

    Park, Jaekwan; Seo, Sangmun; Suh, Yongsukl; Park, Cheol

    2017-01-01

    This paper suggests a practice of plan for SDOE establishment in a nuclear I and C. First, it is necessary to perform a requirements analysis to define key regulatory issues and determine the target systems. The analysis includes a survey to find out the applicable measures credited internationally. Based on the analysis results, this paper proposes an implementation plan including a process harmonizing security activities with legacy software activities and applicable technical, operational, and management measures for target systems. Recently, nuclear I and C has been faced with two security issues, cyber security (CS) and secure development and operational environment (SDOE). Unlike cyber security, few studies on planning SDOE have been presented. This paper suggests a plan for establishing an SDOE in a nuclear I and C. This paper defines three key considerations to comply with the regulatory position of RG. 1.152(R3) and proposes a process harmonizing the security activities with legacy software activities. In addition, this paper proposes technical, operational, and management measures applicable for SDOE.

  14. Operations Research Applications in Audit Planning and Scheduling

    OpenAIRE

    Abdel-Aziz M. Mohamed

    2015-01-01

    This paper presents a state-of-the-art survey of the operations research models developed for internal audit planning. Two alternative approaches have been followed in the literature for audit planning: (1) identifying the optimal audit frequency; and (2) determining the optimal audit resource allocation. The first approach identifies the elapsed time between two successive audits, which can be presented as the optimal number of audits in a given planning horizon, or the ...

  15. Interactive orbital proximity operations planning system instruction and training guide

    Science.gov (United States)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1994-01-01

    This guide instructs users in the operation of a Proximity Operations Planning System. This system uses an interactive graphical method for planning fuel-efficient rendezvous trajectories in the multi-spacecraft environment of the space station and allows the operator to compose a multi-burn transfer trajectory between orbit initial chaser and target trajectories. The available task time (window) of the mission is predetermined and the maneuver is subject to various operational constraints, such as departure, arrival, spatial, plume impingement, and en route passage constraints. The maneuvers are described in terms of the relative motion experienced in a space station centered coordinate system. Both in-orbital plane as well as out-of-orbital plane maneuvering is considered. A number of visual optimization aids are used for assisting the operator in reaching fuel-efficient solutions. These optimization aids are based on the Primer Vector theory. The visual feedback of trajectory shapes, operational constraints, and optimization functions, provided by user-transparent and continuously active background computations, allows the operator to make fast, iterative design changes that rapidly converge to fuel-efficient solutions. The planning tool is an example of operator-assisted optimization of nonlinear cost functions.

  16. GIS Methodology for Planning Planetary-Rover Operations

    Science.gov (United States)

    Powell, Mark; Norris, Jeffrey; Fox, Jason; Rabe, Kenneth; Shu, I-Hsiang

    2007-01-01

    A document describes a methodology for utilizing image data downlinked from cameras aboard a robotic ground vehicle (rover) on a remote planet for analyzing and planning operations of the vehicle and of any associated spacecraft. Traditionally, the cataloging and presentation of large numbers of downlinked planetary-exploration images have been done by use of two organizational methods: temporal organization and correlation between activity plans and images. In contrast, the present methodology involves spatial indexing of image data by use of the computational discipline of geographic information systems (GIS), which has been maturing in terrestrial applications for decades, but, until now, has not been widely used in support of exploration of remote planets. The use of GIS to catalog data products for analysis is intended to increase efficiency and effectiveness in planning rover operations, just as GIS has proven to be a source of powerful computational tools in such terrestrial endeavors as law enforcement, military strategic planning, surveying, political science, and epidemiology. The use of GIS also satisfies the need for a map-based user interface that is intuitive to rover-activity planners, many of whom are deeply familiar with maps and know how to use them effectively in field geology.

  17. Optimal dimensioning of low-energy district heating networks with operational planning

    DEFF Research Database (Denmark)

    Tol, Hakan; Svendsen, Svend

    2012-01-01

    in design stage resulted in satisfaction of heat demand of the house in low temperature operation. In this paper the operational planning of the low-energy DH systems was investigated to reduce the dimensions of the distribution network with consideration given both to current high-heat and future low......-heat demand situations. The operational planning was based on boosting (increasing) the supply temperature at peak-demand situations which occur rarely over a year period. Hence optimal pipe dimensions of low-energy DH systems were investigated based on the dynamic response of in-house heating systems...... of operational planning in comparison to DH network dimensioned according to high heat demand situation....

  18. A Revenue Planning Tool for Charter School Operators

    Science.gov (United States)

    Keller, Eric; Hayes, Cheryl D.

    2009-01-01

    This revenue planning tool aims to help charter school operators develop a sound revenue base that can meet their school's current and future funding needs. It helps identify and assess potential public (federal, state, and local) and private funding sources. The tool incorporates a four-step revenue planning process which includes: (1)…

  19. The Aggregate Planning For Trucking Operation in Cikarang Dry Port

    Directory of Open Access Journals (Sweden)

    Dwi Puspita Sari Utami

    2015-06-01

    Full Text Available Abstract. Cikarang Dry Port currently is the only dry port in Indonesia. This Dry Port has a role to connect or extend the Sea Port to the industrial areas located far from Sea Port. Thus, it creates a value added and also reduce costs. One of the operations done in Cikarang Dry Port is trucking operation. This research aims to examine the planning of 2014 trucking activity in Cikarang Dry Port to determine the right number of the truck that will be best occupied to manage all demands. The analysis begins with demand forecasting by using a moving average method of 12 months or one year period in 2013 which will be used as main information to develop the plans. There are three plans developed in this research. Based on the three plans, Plan A with minimum trucking plan with subcontracting is the most profitable which gives the highest profitability of Rp. 374,984,625. Recommendation for this research is using the current minimum number of 39 trucks rent with additional subcontracting when the demand is exceeding the capacity, thus, Cikarang Dry Port can occupy all demands and gain more profits. Keywords: Aggregate Planning; Scheduling; Trucking Operation; Moving Average; Cikarang Dry Port

  20. The Aggregate Planning For Trucking Operation in Cikarang Dry Port

    Directory of Open Access Journals (Sweden)

    Dwi Puspita Sari Utami

    2015-07-01

    Full Text Available Abstract. Cikarang Dry Port currently is the only dry port in Indonesia. This Dry Port has a role to connect or extend the Sea Port to the industrial areas located far from Sea Port. Thus, it creates a value added and also reduce costs. One of the operations done in Cikarang Dry Port is trucking operation. This research aims to examine the planning of 2014 trucking activity in Cikarang Dry Port to determine the right number of the truck that will be best occupied to manage all demands. The analysis begins with demand forecasting by using a moving average method of 12 months or one year period in 2013 which will be used as main information to develop the plans. There are three plans developed in this research. Based on the three plans, Plan A with minimum trucking plan with subcontracting is the most profitable which gives the highest profitability of Rp. 374,984,625. Recommendation for this research is using the current minimum number of 39 trucks rent with additional subcontracting when the demand is exceeding the capacity, thus, Cikarang Dry Port can occupy all demands and gain more profits.Keywords: Aggregate Planning; Scheduling; Trucking Operation; Moving Average; Cikarang Dry Port

  1. Airborne Data Link Operational Evaluation Test Plan

    Science.gov (United States)

    1993-08-01

    This plan describes an end-to-end study of operational concepts and procedures associated with the introduction of electronic data communications between flight crews and air traffic controllers. Full performance controllers from : terminal facilitie...

  2. 77 FR 24979 - Plan of Operations, Environmental Assessment, Big Thicket National Preserve, Texas

    Science.gov (United States)

    2012-04-26

    ... DEPARTMENT OF THE INTERIOR National Park Service [7148-NZY] Plan of Operations, Environmental.... ACTION: Notice of Availability of a Plan of Operations and Environmental Assessment for a 30-day public... Energy Company (Cimarex), a Plan of Operations to conduct the Rivers Edge 3-D Seismic Survey within the...

  3. How Innovation Theory Can Contribute to the Military Operations Planning Process

    DEFF Research Database (Denmark)

    Heltberg, Anna Therese; Dahl, Kåre

    The research study considers how the application of innovation theory might contribute to military staff work planning processes and bring new perspectives to operational models of analysis such as NATO’s Comprehensive Operations Planning Directive (COPD) and the Danish Field Manual III....

  4. IBM PC/IX operating system evaluation plan

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Granier, Martin; Hall, Philip P.; Triantafyllopoulos, Spiros

    1984-01-01

    An evaluation plan for the IBM PC/IX Operating System designed for IBM PC/XT computers is discussed. The evaluation plan covers the areas of performance measurement and evaluation, software facilities available, man-machine interface considerations, networking, and the suitability of PC/IX as a development environment within the University of Southwestern Louisiana NASA PC Research and Development project. In order to compare and evaluate the PC/IX system, comparisons with other available UNIX-based systems are also included.

  5. Operational workforce planning for check-in counters at airports

    DEFF Research Database (Denmark)

    Stolletz, Raik

    2010-01-01

    This paper addresses operation models for workforce planning for check-in systems at airports. We characterize different tasks of the hierarchical workforce planning problem with time-dependent demand. A binary linear programming formulation is developed for the fortnightly tour scheduling problem...

  6. Metering Plan: Intelligent Operational Strategies Through Enhanced Metering Systems

    Energy Technology Data Exchange (ETDEWEB)

    Pope, Jason E.

    2016-07-27

    The Sustainability Program at Pacific Northwest National Laboratory (PNNL) has adopted a “triple-bottom-line” approach of environmental stewardship, social responsibility, and economic prosperity to its operations. Metering at PNNL works in support of all three, specifically to measure and inform building energy use and greenhouse gas emissions and minimize water use. The foundation for metering at PNNL is a core goal set, which consists of four objectives: providing accurate data without interruption, analyzing data while it is still new, providing actionable recommendations to operations management, and ensuring PNNL’s compliance with contract metering requirements. These core objectives guide the decisions that we make during annual planning and as we operate throughout the year. This 2016 edition of the Metering Plan conveys the metering practices for and vision of the Sustainability Program. Changes in this plan from the 2015 edition include updated tables and an enhanced discussion on energy tracking systems used at PNNL. This plan also discusses updated benchmarking strategies using PNNL’s graphics and analytics tool, BuildingOS by Lucid Design Group. This plan presents our progress toward the metering goals shared by all federal agencies and highlights our successful completion of metering requirements. Currently, PNNL is fully compliant with the applicable legislative and Executive Order metering requirements. PNNL’s approach to the installation of new meters will be discussed. Perhaps most importantly, this plan details the analysis techniques utilized at PNNL that rely on the endless streams of data newly available as a result of increased meter deployment over the last several years. Previous Metering Plans have documented specific meter connection schemes as PNNL focused on deploying meters in a first step toward managing energy and water use. This plan serves not only to highlight PNNL’s successful completion of agency metering goals, but

  7. The design of system for operative planning of blast furnace production process

    Directory of Open Access Journals (Sweden)

    Malindžák Dušan

    1996-12-01

    Full Text Available A system for operative planning of blast furnace production process is described in the paper. The suggested system is based on the use of a new hierarchy of operative plans, consisting of one-month plan, (7+3 days plan, and 24-hour plan. The system allows smoothing of production process at the blast furnace plant, and at the same time satisfies all requirements of the steel plant regarding to the amount of pig iron.

  8. Missouri commercial vehicle operations : state business plan

    Science.gov (United States)

    1998-05-15

    This business plan is intended to assist this state in improving its commercial vehicle operation regulation, guide the deployment and installation of intelligent transportation systems and to implement these systems in an efficient and cost effectiv...

  9. Legal protection against outline operating plans under mining law; Rechtsschutz gegen Rahmenbetriebsplaene im Bergrecht

    Energy Technology Data Exchange (ETDEWEB)

    Schmitz, Holger; Mausch, Marlen [Rechtsanwaltskanzlei Noerr LLP, Berlin (Germany)

    2011-03-15

    In the outline planning for a mining project the question of to what extent the interests of potentially affected surface owners must be taken into account at this early stage of project planning regularly arises. In this contribution the authors explain after a brief introduction to the subject the current jurisdiction of the Federal Administrative Court in respect of the corresponding legal requirements on the outline operating plants, the legal effects of the approval of an outline operating plan and the right of the surface owners to contest the operating plan approval. In addition the permissibility of the initial treatment of owner interests in subsequent special operating plans is described. It is evident that the binding effect of the outline operating plans on the one hand and the transfer of owner interests to special operating plans on the other conflict to a certain extent. (orig.)

  10. Joint operations planning for space surveillance missions on the MSX satellite

    Science.gov (United States)

    Stokes, Grant; Good, Andrew

    1994-01-01

    The Midcourse Space Experiment (MSX) satellite, sponsored by BMDO, is intended to gather broad-band phenomenology data on missiles, plumes, naturally occurring earthlimb backgrounds and deep space backgrounds. In addition the MSX will be used to conduct functional demonstrations of space-based space surveillance. The JHU/Applied Physics Laboratory (APL), located in Laurel, MD, is the integrator and operator of the MSX satellite. APL will conduct all operations related to the MSX and is charged with the detailed operations planning required to implement all of the experiments run on the MSX except the space surveillance experiments. The non-surveillance operations are generally amenable to being defined months ahead of time and being scheduled on a monthly basis. Lincoln Laboratory, Massachusetts Institute of Technology (LL), located in Lexington, MA, is the provider of one of the principle MSX instruments, the Space-Based Visible (SBV) sensor, and the agency charged with implementing the space surveillance demonstrations on the MSX. The planning timelines for the space surveillance demonstrations are fundamentally different from those for the other experiments. They are generally amenable to being scheduled on a monthly basis, but the specific experiment sequence and pointing must be refined shortly before execution. This allocation of responsibilities to different organizations implies the need for a joint mission planning system for conducting space surveillance demonstrations. This paper details the iterative, joint planning system, based on passing responsibility for generating MSX commands for surveillance operations from APL to LL for specific scheduled operations. The joint planning system, including the generation of a budget for spacecraft resources to be used for surveillance events, has been successfully demonstrated during ground testing of the MSX and is being validated for MSX launch within the year. The planning system developed for the MSX forms a

  11. Implications of outsourcing on operations planning : findings from the pharmaceutical industry

    NARCIS (Netherlands)

    Boulaksil, Y.; Fransoo, J.C.

    2010-01-01

    Purpose – The purpose of this paper is to understand the implications of outsourcing at the operational planning level, i.e. how the operational planning function is complicated owing to the strategic outsourcing decisions that have been made in the past. Design/methodology/approach – First, a

  12. UMTS network planning, optimization, and inter-operation with GSM

    CERN Document Server

    Rahnema, Moe

    2008-01-01

    UMTS Network Planning, Optimization, and Inter-Operation with GSM is an accessible, one-stop reference to help engineers effectively reduce the time and costs involved in UMTS deployment and optimization. Rahnema includes detailed coverage from both a theoretical and practical perspective on the planning and optimization aspects of UMTS, and a number of other new techniques to help operators get the most out of their networks. Provides an end-to-end perspective, from network design to optimizationIncorporates the hands-on experiences of numerous researchersSingle

  13. Orbital Express mission operations planning and resource management using ASPEN

    Science.gov (United States)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Daniel

    2008-04-01

    As satellite equipment and mission operations become more costly, the drive to keep working equipment running with less labor-power rises. Demonstrating the feasibility of autonomous satellite servicing was the main goal behind the Orbital Express (OE) mission. Like a tow-truck delivering gas to a car on the road, the "servicing" satellite of OE had to find the "client" from several kilometers away, connect directly to the client, and transfer fluid (or a battery) autonomously, while on earth-orbit. The mission met 100% of its success criteria, and proved that autonomous satellite servicing is now a reality for space operations. Planning the satellite mission operations for OE required the ability to create a plan which could be executed autonomously over variable conditions. As the constraints for execution could change weekly, daily, and even hourly, the tools used create the mission execution plans needed to be flexible and adaptable to many different kinds of changes. At the same time, the hard constraints of the plans needed to be maintained and satisfied. The Automated Scheduling and Planning Environment (ASPEN) tool, developed at the Jet Propulsion Laboratory, was used to create the schedule of events in each daily plan for the two satellites of the OE mission. This paper presents an introduction to the ASPEN tool, an overview of the constraints of the OE domain, the variable conditions that were presented within the mission, and the solution to operations that ASPEN provided. ASPEN has been used in several other domains, including research rovers, Deep Space Network scheduling research, and in flight operations for the NASA's Earth Observing One mission's EO1 satellite. Related work is discussed, as are the future of ASPEN and the future of autonomous satellite servicing.

  14. COMPARISON OF TWO METHODS OF OPERATING THEATRE PLANNING: APPLICATION IN BELGIAN HOSPITAL

    Institute of Scientific and Technical Information of China (English)

    Sondes CHAABANE; Nadine MESKENS; Alain GUINET; Marius LAURENT

    2008-01-01

    Operating Theatre is the centre of the hospital management's efforts. It constitutes the most expensive sector with more than 10% of the intended operating budget of the hospital. To reduce the costs while maintaining a good quality of care, one of the solutions is to improve the existent planning and scheduling methods by improving the services and surgical specialty coordination or finding the best estimation of surgical case durations. The other solution is to construct an effective surgical case plan and schedule. The operating theatre planning and scheduling is the two important steps, which aim to make a surgical case programming with an objective of obtaining a realizable and efficient surgical case schedule. This paper focuses on the first step, the operating theatre planning problem. Two planning methods are introduced and compared. Real data of a Belgian university hospital "Tivoli" are used for the experiments.

  15. Spacelab shaping space operations planning

    Science.gov (United States)

    Steven, F. R.; Reinhold, C.

    1976-01-01

    An up-to-date picture is presented of the organizational structure, the key management personnel, and management relationships of the Spacelab program. Attention is also given to Spacelab's development status and plans for its operations. A number of charts are provided to illustrate the organizational relations. It is pointed out that the parties involved in Spacelab activities must yet resolve questions about ownership of transportation-system elements, payloads, ground support facilities, and data obtained from space missions.

  16. 3D Boolean operations in virtual surgical planning.

    Science.gov (United States)

    Charton, Jerome; Laurentjoye, Mathieu; Kim, Youngjun

    2017-10-01

    Boolean operations in computer-aided design or computer graphics are a set of operations (e.g. intersection, union, subtraction) between two objects (e.g. a patient model and an implant model) that are important in performing accurate and reproducible virtual surgical planning. This requires accurate and robust techniques that can handle various types of data, such as a surface extracted from volumetric data, synthetic models, and 3D scan data. This article compares the performance of the proposed method (Boolean operations by a robust, exact, and simple method between two colliding shells (BORES)) and an existing method based on the Visualization Toolkit (VTK). In all tests presented in this article, BORES could handle complex configurations as well as report impossible configurations of the input. In contrast, the VTK implementations were unstable, do not deal with singular edges and coplanar collisions, and have created several defects. The proposed method of Boolean operations, BORES, is efficient and appropriate for virtual surgical planning. Moreover, it is simple and easy to implement. In future work, we will extend the proposed method to handle non-colliding components.

  17. Operations plan for the Regional Seismic Test Network

    International Nuclear Information System (INIS)

    1981-01-01

    The Regional Seismic Test Network program was established to provide a capability for detection of extremely sensitive earth movements. Seismic signals from both natural and man-made earth motions will be analyzed with the ultimate objective of accurately locating underground nuclear explosions. The Sandia National Laboratories, Albuquerque, has designed an unattended seismic station capable of recording seismic information received at the location of the seismometers installed as part of that specific station. A network of stations is required to increase the capability of determining the source of the seismic signal and the location of the source. Current plans are to establish a five-station seismic network in the United States and Canada. The Department of Energy, Nevada Operations Office, has been assigned the responsibility for deploying, installing, and operating these remote stations. This Operation Plan provides the basic information and tasking to accomplish this assignment

  18. Electric Motors Maintenance Planning From Its Operating Variables

    Science.gov (United States)

    Rodrigues, Francisco; Fonseca, Inácio; Farinha, José Torres; Ferreira, Luís; Galar, Diego

    2017-09-01

    The maintenance planning corresponds to an approach that seeks to maximize the availability of equipment and, consequently, increase the levels of competitiveness of companies by increasing production times. This paper presents a maintenance planning based on operating variables (number of hours worked, duty cycles, number of revolutions) to maximizing the availability of operation of electrical motors. The reading of the operating variables and its sampling is done based on predetermined sampling cycles and subsequently is made the data analysis through time series algorithms aiming to launch work orders before reaching the variables limit values. This approach is supported by tools and technologies such as logical applications that enable a graphical user interface for access to relevant information about their Physical Asset HMI (Human Machine Interface), including the control and supervision by acquisition through SCADA (Supervisory Control And data acquisition) data, also including the communication protocols among different logical applications.

  19. Organizing for low cost space operations - Status and plans

    Science.gov (United States)

    Lee, C.

    1976-01-01

    Design features of the Space Transportation System (vehicle reuse, low cost expendable components, simple payload interfaces, standard support systems) must be matched by economical operational methods to achieve low operating and payload costs. Users will be responsible for their own payloads and will be charged according to the services they require. Efficient use of manpower, simple documentation, simplified test, checkout, and flight planning are firm goals, together with flexibility for quick response to varying user needs. Status of the Shuttle hardware, plans for establishing low cost procedures, and the policy for user charges are discussed.

  20. Optimal day-ahead operational planning of microgrids

    International Nuclear Information System (INIS)

    Hosseinnezhad, Vahid; Rafiee, Mansour; Ahmadian, Mohammad; Siano, Pierluigi

    2016-01-01

    Highlights: • A new multi-objective model for optimal day-ahead operational planning of microgrids is proposed. • A new concept called seamlessness is introduced to control the sustainability of microgrid. • A new method is developed to manage the load and renewable energy resources estimation errors. • A new solution based on a combination of numerical and evolutionary approaches is proposed. - Abstract: Providing a cost-efficient, eco-friendly and sustainable energy is one of the main issues in modern societies. In response to this demand, new features of microgrid technology have provided huge potentials while distributing electricity more effectively, economically and securely. Accordingly, this paper presents a new multi-objective generation management model for optimal day-ahead operational planning of medium voltage microgrids. The proposed model optimizes both pollutant emission and operating cost of a microgrid by using multi-objective optimization. Besides, a seamlessness-selective algorithm is integrated into the model, which can be adopted to achieve the desired self-sufficiency level for microgrids along a specified planning horizon. Furthermore, the model is characterized by a reserve-assessment strategy developed to handle the load and renewable energy resources estimation errors. The introduced model is solved using a combination of numerical and evolutionary methods of species-based quantum particle swarm optimization to find the optimal scheduling scheme and minos-based optimal power flow to optimize the operating cost and emission. In addition, the suggested solution approach also incorporates an efficient mechanism for considering energy storage systems and coding the candidate solutions in the evolutionary algorithm. The proposed model is implemented on a test microgrid and is investigated through simulations to study the different aspects of the problem. The results show significant improvements and benefits which are obtained by

  1. Mixer pump long term operations plan for Tank 241-SY-101 mitigation

    International Nuclear Information System (INIS)

    Irwin, J.J.

    1994-01-01

    This document provides the general Operations Plan for performance of the mixer pump long term operations for Tank 241-SY-101 mitigation of gas retention and periodic release in Tank 101-SY. This operations plan will utilize a 112 kW (150 hp) mixing pump to agitate/suspend the particulates in the tank

  2. Modular space station, phase B extension. Program operations plan

    Science.gov (United States)

    1971-01-01

    An organized approach is defined for establishing the most significant requirements pertaining to mission operations, information management, and computer program design and development for the modular space station program. The operations plan pertains to the space station and experiment module program elements and to the ground elements required for mission management and mission support operations.

  3. Action plan for Nordic energy co-operation 2006-2009

    International Nuclear Information System (INIS)

    2005-01-01

    The Action Plan for Nordic Energy Co-operation 2006-2009 is targeted at creating a visible and sustainable contribution to solving the most important and politically most relevant energy policy challenges faced by the Nordic region. The plan concentrates on three main areas: Energy markets; Sustainable energy system; and Nordic impact on the international agenda. The Action Plan is the energy sector's contribution to the implementation of the Nordic strategy 'Sustainable Development - New Bearing for the Nordic Countries' and to a number of the Nordic Council's recommendations for the development of the Nordic energy sector. An important element of the implementation of the action plan is on-going contact and information sharing between the Nordic Energy Policy co-operation and the Nordic Energy Research. The continues dialogue between the Nordic Council of Energy Ministers and The Nordic Council on future energy policy challenges will likewise be an important part of the political process. (BA)

  4. Planning, Management, and Economics of Airport Operation

    Science.gov (United States)

    Wiley, J.

    1972-01-01

    An overview of the role of the airport in the transportation complex and in the community is presented. The establishment of the airport including its requirements in regional planning and the operation of the airport as a social and economic force are discussed.

  5. A Test Platform for Planned Field Operations Using LEGO Mindstorms NXT

    Directory of Open Access Journals (Sweden)

    Gareth Edwards

    2013-11-01

    Full Text Available Testing agricultural operations and management practices associated with different machinery, systems and planning approaches can be both costly and time-consuming. Computer simulations of such systems are used for development and testing; however, to gain the experience of real-world performance, an intermediate step between simulation and full-scale testing should be included. In this paper, a potential common framework using the LEGO Mindstorms NXT micro-tractor platform is described in terms of its hardware and software components. The performance of the platform is demonstrated and tested in terms of its capability of supporting decision making on infield operation planning. The proposed system represents the basic measures for developing a complete test platform for field operations, where route plans, mission plans, multiple-machinery cooperation strategies and machinery coordination can be executed and tested in the laboratory.

  6. Environmental Control Plan for the 300-FF-1 Operable Unit Remedial Action

    International Nuclear Information System (INIS)

    Carlson, R.A.

    2000-01-01

    This environmental control plan is for the 300-FF-1 Operable Unit Remedial Action Project. The purpose of this plan is to identify environmental requirements for the 300-FF-1 operable unit Remedial Action/Waste Disposal Project

  7. Operative planning of functional sessions for multisatellite observation and communication systems

    Science.gov (United States)

    Darnopykh, Valeriy V.; Malyshev, Veniamin V.

    2012-04-01

    An important control aspect of modern satellite observation and communication systems is the control of the functional processes. Functional sessions proceed under conditions of restricted technical ability, large amounts or information to be processed by the on-board equipment, practice inequality of the received information, intentions of system management and operators, interests of customers and other factors. A large number of spacecrafts (SC) in orbital constellation is one of the most important factors affecting the functional process also. Besides that some modern projects of satellite systems are multifunctional that is mixed operations of observation and communication. Therefore the functioning of SC on-board equipment must be accurately co-ordinate. That is why the problem of operative planning the functioning of these systems, while directly affecting the efficiency of the system, is very complex and actual at present. A methodical approach and software package for operative planning of functional processes for satellite observation and communication systems, including multifunctional projects, are considered in the paper. The base scheme of this approach consists of four main stages: stage 1—modeling of SC orbital kinematics and dynamics; stage 2—modeling of system functional processes with all kind of restrictions and criterion function values; stage 3—solving an optimization tasks by numerical applicable algorithms and constructing the optimal (or accuracy) plans; stage 4—repeated plan optimization (different variants) and analyzing. Such scheme is the result of authors practical research which have been realized during last 15 years by the operative planning as for any kinds of single SC as for satellite systems with different structure of orbital constellation. The research helps to unify the procedure of operative planning, to formulate basic principles and approaches for its solving, to develop special software package. The main aspects

  8. ELECTRIC MOTORS MAINTENANCE PLANNING FROM ITS OPERATING VARIABLES

    Directory of Open Access Journals (Sweden)

    Francisco RODRIGUES

    2017-07-01

    Full Text Available The maintenance planning corresponds to an approach that seeks to maximize the availability of equipment and, conse-quently, increase the levels of competitiveness of companies by increasing production times. This paper presents a maintenance planning based on operating variables (number of hours worked, duty cycles, number of revolutions to maximizing the availability of operation of electrical motors. The reading of the operating variables and its sampling is done based on predetermined sampling cycles and subsequently is made the data analysis through time series algo-rithms aiming to launch work orders before reaching the variables limit values. This approach is supported by tools and technologies such as logical applications that enable a graphical user interface for access to relevant information about their Physical Asset HMI (Human Machine Interface, including the control and supervision by acquisition through SCADA (Supervisory Control And data acquisition data, also including the communication protocols among different logical applications.

  9. Operational freight carrier planning basic concepts, optimization models and advanced memetic algorithms

    CERN Document Server

    Schönberger, Jörn

    2005-01-01

    The modern freight carrier business requires a sophisticated automatic decision support in order to ensure the efficiency and reliability and therefore the survival of transport service providers. This book addresses these challenges and provides generic decision models for the short-term operations planning as well as advanced metaheuristics to obtain efficient operation plans. After a thorough analysis of the operations planning in the freight carrier business, decision models are derived. Their suitability is proven within a large number of numerical experiments, in which a new class of hybrid genetic search approaches demonstrate their appropriateness.

  10. Pandemic planning : oilsands operators and the regional municipality constantly refine strategy

    Energy Technology Data Exchange (ETDEWEB)

    Ball, C.G.

    2008-06-15

    The Alberta government anticipates that between 17 to 43 per cent of the province's population will be affected during a potential influenza pandemic. It is expected that between 3 and 12,000 Albertans will be hospitalized and up to 3000 will die. This article discussed emergency plans made by the oil and gas industry for future pandemics. Oil sands operators in the Wood Buffalo municipality prepared plans based on guidelines made by the World Health Organization (WHO) and various government bodies. The transient nature of the region's population and its limited health resources may increase the level of risk associated with a pandemic. The planning process adopted by the region has been designed to provide staff with the ability to deal with increased numbers of people visiting the hospital. The planning process includes training exercises that range from desktop drills to the setting up of triage areas. Other plans include the identification of operations and processes that would be at risk in the event of a pandemic, as well the identification of key operations and roles. Plans are constantly being refined in order to identify new areas of risk. 1 fig.

  11. Centralized operations and maintenance planning at the Atacama Large Millimeter/submillimeter Array (ALMA)

    Science.gov (United States)

    Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan

    2016-07-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.

  12. Mission Operations Planning with Preferences: An Empirical Study

    Science.gov (United States)

    Bresina, John L.; Khatib, Lina; McGann, Conor

    2006-01-01

    This paper presents an empirical study of some nonexhaustive approaches to optimizing preferences within the context of constraint-based, mixed-initiative planning for mission operations. This work is motivated by the experience of deploying and operating the MAPGEN (Mixed-initiative Activity Plan GENerator) system for the Mars Exploration Rover Mission. Responsiveness to the user is one of the important requirements for MAPGEN, hence, the additional computation time needed to optimize preferences must be kept within reasonabble bounds. This was the primary motivation for studying non-exhaustive optimization approaches. The specific goals of rhe empirical study are to assess the impact on solution quality of two greedy heuristics used in MAPGEN and to assess the improvement gained by applying a linear programming optimization technique to the final solution.

  13. Innovations for ISS Plug-In Plan (IPiP) Operations

    Science.gov (United States)

    Moore, Kevin D.

    2013-01-01

    Limited resources and increasing requirements will continue to influence decisions on ISS. The ISS Plug-In Plan (IPiP) supports power and data for utilization, systems, and daily operations through the Electrical Power System (EPS) Secondary Power/Data Subsystem. Given the fluid launch schedule, the focus of the Plug-In Plan has evolved to anticipate future requirements by judicious development and delivery of power supplies, power strips, Alternating Current (AC) power inverters, along with innovative deployment strategies. A partnership of ISS Program Office, Engineering Directorate, Mission Operations, and International Partners poses unique solutions with existing on-board equipment and resources.

  14. Chemical Weapons: FEMA and Army Must Be Proactive in Preparing States for Emergencies

    National Research Council Canada - National Science Library

    2001-01-01

    .... Such an accident could affect people in 10 different states. The Army plans to destroy its entire chemical weapons stockpile by 2007 and is taking measures to protect the public before and during the demilitarization process...

  15. 7 CFR 272.2 - Plan of operation.

    Science.gov (United States)

    2010-01-01

    ... next year, State agencies shall consider major corrective action objectives, existing program strengths... Plan of Operation. The State and FNS (USDA) further agree to fully comply with any changes in Federal... belief, religion, handicap, or national origin, be excluded from participation in, be denied the benefits...

  16. Operational Plan for Underground Storage Tank 322 R2U2

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-06-07

    This Operational Plan provides the operator of the tank system with guidelines relating to the safe and compliant operation and maintenance of the tank system. The tank system schematic and list of emergency contacts shall be posted near the tank so they are visible to tank personnel. This Operational Plan shall be kept on file by the Facility Supervisor. It should be understood when managing this tank system that it is used to store hazardous waste temporarily for 90 calendar days or less. The rinsewater handled in the tank system is considered hazardous and may exhibit the characteristic of toxicity.

  17. Committee on the safety of nuclear installations - Operating plan (2006 - 2009)

    International Nuclear Information System (INIS)

    2007-01-01

    In 2004, NEA issued its Strategic Plan covering the period 2005-2009, addressing the NEA activities associated with nuclear safety and regulation. Committee on the Safety of Nuclear Installations (CSNI) and Committee on Nuclear Regulatory Activities (CNRA), which have the primary responsibility for activities in this area, have developed and issued a joint strategic plan covering this same time period. As requested in the Joint Strategic Plan, each committee is to prepare an operating plan which describes in more detail the committee's organisation, planned activities, priorities and operating procedures to be used to implement the Joint Strategic Plan. In effect, the Joint Strategic Plan defines what type of work CSNI should do, whereas the Operating Plan describes the overall work scope and how to accomplish it to meet the joint CSNI/CNRA Strategic Plan objectives and mission. The present Operating Plan follows and takes into account the outcome of a CSNI assessment group, which has evaluated the CSNI activities. The assessment group expressed appreciation for the CSNI role and activity, while making recommendations with regards to scope of work and way to operate in order to further improve efficiency. The main objectives of CSNI are to: - Keep all member countries involved in and abreast of developments in safety technology. - Review operating experience with the objective to identify safety issues that need to be addressed by new research. - Review the state-of-knowledge on selected topics of nuclear safety technology and safety assessment. - Promote training and research projects that serve to maintain competence in nuclear safety matters. - Promote research as needed to reach consensus on nuclear safety issues of common interest. - Consider the safety implications of scientific and technical developments. To accomplish these objectives, CSNI is organised into six permanent working groups (as described in Section II), each covering a different set of

  18. 36 CFR 292.66 - Operating plan requirements-outstanding mineral rights.

    Science.gov (United States)

    2010-07-01

    ... products, insecticides, pesticides, and herbicides that will be used during the mineral operation and the...-site and off-site damage to natural resources resulting from mineral operations. The plan must: (i...

  19. Linear programming models with planned lead times for supply chain operations planning

    NARCIS (Netherlands)

    Spitter, J.M.; Hurkens, C.A.J.; Kok, de A.G.; Lenstra, J.K.; Negenman, E.G.

    2005-01-01

    This paper contributes to the development of models for capacity constrained Supply Chain Operations Planning (SCOP). We focus on production environments with arbitrary supply chain structures. The demand for the end items is assumed to be exogenously determined. We solve the SCOP problem with

  20. A High-Speed Train Operation Plan Inspection Simulation Model

    Directory of Open Access Journals (Sweden)

    Yang Rui

    2018-01-01

    Full Text Available We developed a train operation simulation tool to inspect a train operation plan. In applying an improved Petri Net, the train was regarded as a token, and the line and station were regarded as places, respectively, in accordance with the high-speed train operation characteristics and network function. Location change and running information transfer of the high-speed train were realized by customizing a variety of transitions. The model was built based on the concept of component combination, considering the random disturbance in the process of train running. The simulation framework can be generated quickly and the system operation can be completed according to the different test requirements and the required network data. We tested the simulation tool when used for the real-world Wuhan to Guangzhou high-speed line. The results showed that the proposed model can be developed, the simulation results basically coincide with the objective reality, and it can not only test the feasibility of the high-speed train operation plan, but also be used as a support model to develop the simulation platform with more capabilities.

  1. Tank Farm Contractor Operation and Utilization Plan [SEC 1 Thru 3

    Energy Technology Data Exchange (ETDEWEB)

    KIRKBRIDE, R.A.

    1999-05-04

    The Tank Waste Remediation System Operation and Utilization Plan updates the operating scenario and plans for the delivery of feed to BNFL Inc., retrieval of waste from single-shell tanks, and the overall process flowsheets for Phases I and II of the privatization of the Tank Waste Remediation System. The plans and flowsheets are updated with the most recent tank-by-tank inventory and sludge washing data. Sensitivity cases were run to evaluate the impact or benefits of proposed changes to the BNFL Inc. contract and to evaluate a risk-based SST retrieval strategy.

  2. 77 FR 37283 - General Provisions; Operating and Strategic Business Planning; Effective Date

    Science.gov (United States)

    2012-06-21

    ... directors of each Farm Credit System institution to adopt an operational and strategic business plan to... FARM CREDIT ADMINISTRATION 12 CFR Part 618 RIN 3052-AC66 General Provisions; Operating and Strategic Business Planning; Effective Date AGENCY: Farm Credit Administration. ACTION: Notice of effective...

  3. Computer guided pre-operative planning and dental implant placement

    Directory of Open Access Journals (Sweden)

    Dušan Grošelj

    2007-05-01

    Full Text Available Background: Implants in dentistry are, besides fixed, removable and maxillofacial prosthodontics, one of the reliable possibility to make functional and aesthetic rehabilitation of the edentulism. Surgical and prosthodontic implant complications are often an inattentive consequence of wrong diagnosis, planning, and placement. In this article we present a technique using a highly advanced software program along with a rapid prototyping technology named stereolithography. A planning software for implant placement needs basically the high quality computed tomographic scan of one or both jaws for making accurate preoperative diagnostics and 3D preoperative plan. Later individual drill guide is designed and generated based on both the CT images and the preoperative planning. The patient specific drill guide transfers the virtual planning to the patient’s mouth at time of surgery.Conclusions: The advantages of computer guided implantology are the better prepared surgery with visualisation of critical anatomic structures, assessment of available bone and data about bone quality, increased confidence for the surgeon, deceased operative time, less frequent use of bone grafts, higher quality of collaboration between specialists and prosthetic lab and better communication with patients. Radiographic examination of the operation field for computer guided planning for implant placement is due to high costs justified as the most important information source on the areas to be implanted.

  4. Light Duty Utility Arm system pre-operational (cold test) test plan

    International Nuclear Information System (INIS)

    Bennett, K.L.

    1995-01-01

    The Light Duty Utility (LDUA) Cold Test Facility, located in the Hanford 400 Area, will be used to support cold testing (pre- operational tests) of LDUA subsystems. Pre-operational testing is composed of subsystem development testing and rework activities, and integrated system qualification testing. Qualification testing will be conducted once development work is complete and documentation is under configuration control. Operational (hot) testing of the LDUA system will follow the testing covered in this plan and will be covered in a separate test plan

  5. Improving the Operations of the Earth Observing One Mission via Automated Mission Planning

    Science.gov (United States)

    Chien, Steve A.; Tran, Daniel; Rabideau, Gregg; Schaffer, Steve; Mandl, Daniel; Frye, Stuart

    2010-01-01

    We describe the modeling and reasoning about operations constraints in an automated mission planning system for an earth observing satellite - EO-1. We first discuss the large number of elements that can be naturally represented in an expressive planning and scheduling framework. We then describe a number of constraints that challenge the current state of the art in automated planning systems and discuss how we modeled these constraints as well as discuss tradeoffs in representation versus efficiency. Finally we describe the challenges in efficiently generating operations plans for this mission. These discussions involve lessons learned from an operations model that has been in use since Fall 2004 (called R4) as well as a newer more accurate operations model operational since June 2009 (called R5). We present analysis of the R5 software documenting a significant (greater than 50%) increase in the number of weekly observations scheduled by the EO-1 mission. We also show that the R5 mission planning system produces schedules within 15% of an upper bound on optimal schedules. This operational enhancement has created value of millions of dollars US over the projected remaining lifetime of the EO-1 mission.

  6. Oceanic gamefish/Skylab project field operating plan for operations 4, 5 August. [in Gulf of Mexico

    Science.gov (United States)

    1973-01-01

    The operation plans are presented for the oceanic Gamefish/Skylab Experiment 240, which was conducted to obtain fish catch data for the northeast area of the Gulf of Mexico. The plans for surface measurements, aerial observations, and communications are included.

  7. Advances in Distributed Operations and Mission Activity Planning for Mars Surface Exploration

    Science.gov (United States)

    Fox, Jason M.; Norris, Jeffrey S.; Powell, Mark W.; Rabe, Kenneth J.; Shams, Khawaja

    2006-01-01

    A centralized mission activity planning system for any long-term mission, such as the Mars Exploration Rover Mission (MER), is completely infeasible due to budget and geographic constraints. A distributed operations system is key to addressing these constraints; therefore, future system and software engineers must focus on the problem of how to provide a secure, reliable, and distributed mission activity planning system. We will explain how Maestro, the next generation mission activity planning system, with its heavy emphasis on portability and distributed operations has been able to meet these design challenges. MER has been an excellent proving ground for Maestro's new approach to distributed operations. The backend that has been developed for Maestro could benefit many future missions by reducing the cost of centralized operations system architecture.

  8. Iterative Repair Planning for Spacecraft Operations Using the Aspen System

    Science.gov (United States)

    Rabideau, G.; Knight, R.; Chien, S.; Fukunaga, A.; Govindjee, A.

    2000-01-01

    This paper describes the Automated Scheduling and Planning Environment (ASPEN). ASPEN encodes complex spacecraft knowledge of operability constraints, flight rules, spacecraft hardware, science experiments and operations procedures to allow for automated generation of low level spacecraft sequences. Using a technique called iterative repair, ASPEN classifies constraint violations (i.e., conflicts) and attempts to repair each by performing a planning or scheduling operation. It must reason about which conflict to resolve first and what repair method to try for the given conflict. ASPEN is currently being utilized in the development of automated planner/scheduler systems for several spacecraft, including the UFO-1 naval communications satellite and the Citizen Explorer (CX1) satellite, as well as for planetary rover operations and antenna ground systems automation. This paper focuses on the algorithm and search strategies employed by ASPEN to resolve spacecraft operations constraints, as well as the data structures for representing these constraints.

  9. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.J.

    1980-07-01

    The NRC plan defines the functional role of the NRC in cleanup operations at Three Mile Island Unit 2 to assure that agency regulatory responsibilities and objectives will be fulfilled. The plan outlines NRC functions in TMI-2 cleanup operations in the following areas: (1) the functional relationship of NRC to other government agencies, the public, and the licensee to coordinate activities, (2) the functional roles of these organizations in cleanup operations, (3) the NRC review and decision-making procedure for the licensee's proposed cleanup operation, (4) the NRC/licensee estimated schedule of major actions, and (5) NRC's functional role in overseeing implementation of approved licensee activities

  10. Tool for Military Logistics Planning of Peace Support Operations: The OTAS Planning Tool

    NARCIS (Netherlands)

    Merrienboer, S.A. van

    1998-01-01

    Within the research group Operations Research Studies Army of the TNO Physics and Electronics Laboratory the OTAS planning tool is developed for the Royal Netherlands Armed Forces. This paper gives a general and brief description of the tool.

  11. Motion and operation planning of robotic systems background and practical approaches

    CERN Document Server

    Gomez-Barvo, Fernando

    2015-01-01

    This book addresses the broad multi-disciplinary topic of robotics, and presents the basic techniques for motion and operation planning in robotics systems. Gathering contributions from experts in diverse and wide ranging fields, it offers an overview of the most recent and cutting-edge practical applications of these methodologies. It covers both theoretical and practical approaches, and elucidates the transition from theory to implementation. An extensive analysis is provided, including humanoids, manipulators, aerial robots and ground mobile robots. ‘Motion and Operation Planning of Robotic Systems’ addresses the following topics: *The theoretical background of robotics. *Application of motion planning techniques to manipulators, such as serial and parallel manipulators. *Mobile robots planning, including robotic applications related to aerial robots, large scale robots and traditional wheeled robots. *Motion planning for humanoid robots. An invaluable reference text for graduate students and researche...

  12. Institutional plan -- Institute of Nuclear Power Operations, 1993

    International Nuclear Information System (INIS)

    1993-01-01

    The US nuclear electric utility industry established the Institute of Nuclear Power Operations (INPO) in 1979 to promote the highest levels of safety and reliability -- to promote excellence -- in the operation of its nuclear plants. After its formation, the Institute grew from a handful of on-loan personnel in late 1979 to an established work force of more than 400 permanent and on-loan personnel. INPO's early years were marked by growth and evolution of its programs and organization. The Institute now focuses primarily on the effectiveness and enhancement of established programs and activities. For INPO to carry out its role, it must have the support of its members and participants and a cooperative but independent relationship with the NRC. A basis for that support and cooperation is an understanding of INPO's role. This Institutional Plan is intended to provide that understanding by defining the Institute's role and its major programs. This plan considers the existing and projected needs of the industry and the overall environment in which INPO and its members and participants operate

  13. 30 CFR 903.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 903.784 Section 903.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application...

  14. 30 CFR 910.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 910.784 Section 910.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  15. 30 CFR 947.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 947.784 Section 947.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  16. 30 CFR 942.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 942.784 Section 942.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  17. 30 CFR 939.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 939.784 Section 939.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  18. 30 CFR 921.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 921.780 Section 921.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  19. 30 CFR 941.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 941.784 Section 941.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  20. 30 CFR 922.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 922.784 Section 922.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  1. 30 CFR 933.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 933.780 Section 933.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  2. 30 CFR 905.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 905.784 Section 905.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  3. 30 CFR 933.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 933.784 Section 933.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  4. 30 CFR 921.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 921.784 Section 921.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  5. Probabilistic tools for planning and operating power systems with distributed energy storage

    DEFF Research Database (Denmark)

    Klöckl, Bernd; Papaefthymiou, George; Pinson, Pierre

    2008-01-01

    Stochastic energy flows are an increasingly important phenomenon in today's power system planning and operation. They are – among other reasons – caused by large amounts of stochastic generation such as wind. The inclusion of energy storage devices, distributed in future systems (distributed energy...... owners are either the grid operators, the generation owners, or the energy traders. For the grid operators being the DES owners, storage operation will have to be integrated into the planning of the system, therefore multivariate nonparametric time series analysis and synthesis methods have to be applied...... to recorded data of stochastic energy resources. Together with suited storage models, the implications of DES on the planning of the system can then be assessed. For the producers or traders being the owners of the DES, the topic to be addressed is the real-time operation of each storage device in the power...

  6. 30 CFR 937.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 937.784 Section 937.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  7. 30 CFR 942.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 942.780 Section 942.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  8. 30 CFR 912.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 912.780 Section 912.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  9. 30 CFR 939.780 - Surface mining permit applications-minimum requirements for reclamation and operations plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operations plan. 939.780 Section 939.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operations plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  10. 30 CFR 905.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 905.780 Section 905.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  11. 30 CFR 947.780 - Surface mining permit application-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 947.780 Section 947.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Application—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  12. 30 CFR 910.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 910.780 Section 910.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  13. 30 CFR 922.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 922.780 Section 922.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  14. 30 CFR 903.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 903.780 Section 903.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application to conduct...

  15. 30 CFR 912.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 912.784 Section 912.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  16. 30 CFR 937.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 937.780 Section 937.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  17. 30 CFR 941.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 941.780 Section 941.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  18. Solid waste operations complex engineering verification program plan

    International Nuclear Information System (INIS)

    Bergeson, C.L.

    1994-01-01

    This plan supersedes, but does not replace, the previous Waste Receiving and Processing/Solid Waste Engineering Development Program Plan. In doing this, it does not repeat the basic definitions of the various types or classes of development activities nor provide the rigorous written description of each facility and assign the equipment to development classes. The methodology described in the previous document is still valid and was used to determine the types of verification efforts required. This Engineering Verification Program Plan will be updated on a yearly basis. This EVPP provides programmatic definition of all engineering verification activities for the following SWOC projects: (1) Project W-026 - Waste Receiving and Processing Facility Module 1; (2) Project W-100 - Waste Receiving and Processing Facility Module 2A; (3) Project W-112 - Phase V Storage Facility; and (4) Project W-113 - Solid Waste Retrieval. No engineering verification activities are defined for Project W-112 as no verification work was identified. The Acceptance Test Procedures/Operational Test Procedures will be part of each project's Title III operation test efforts. The ATPs/OTPs are not covered by this EVPP

  19. 10 CFR 63.161 - Emergency plan for the geologic repository operations area through permanent closure.

    Science.gov (United States)

    2010-01-01

    ... Planning Criteria § 63.161 Emergency plan for the geologic repository operations area through permanent... 10 Energy 2 2010-01-01 2010-01-01 false Emergency plan for the geologic repository operations area... may occur at the geologic repository operations area, at any time before permanent closure and...

  20. 18 CFR 376.209 - Procedures during periods of emergency requiring activation of the Continuity of Operations Plan.

    Science.gov (United States)

    2010-04-01

    ... periods of emergency requiring activation of the Continuity of Operations Plan. 376.209 Section 376.209... of the Continuity of Operations Plan. (a)(1) The Commission's Continuity of Operations Plan is...) During periods when the Continuity of Operations Plan is activated, the Commission will continue to act...

  1. Capital planning for operating theatres based on projecting future theatre requirements.

    Science.gov (United States)

    Sheehan, Jennifer A; Tyler, Peter; Jayasinha, Hirani; Meleady, Kathleen T; Jones, Neill

    2011-05-01

    During 2006, NSW and ACT Health Departments jointly engaged KPMG to develop an Operating Theatre Requirements' Projection Model and an accompanying planning guideline. A research scan was carried out to identify drivers of surgical demand, theatre capacity and theatre performance, as well as locating existing approaches to modelling operating theatre requirements for planning purposes. The project delivered a Microsoft Excel-based model for projecting future operating theatre requirements, together with an accompanying guideline for use of the model and interpretation of its outputs. It provides a valuable addition to the suite of tools available to Health staff for service and capital planning. The model operates with several limitations, largely due to being data dependent, and the state and completeness of available theatre activity data. However, the operational flexibility built into the model allows users to compensate for these limitations, on a case by case basis, when the user has access to suitable, local data. The design flexibility of the model means that updating the model as improved data become available is not difficult; resulting in revisions being able to be made quickly, and disseminated to users rapidly.

  2. Pilot-scale treatability test plan for the 200-UP-1 groundwater Operable Unit

    International Nuclear Information System (INIS)

    Wittreich, C.D.

    1994-05-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-UP-1 Operable Unit. This treatability test plan has been prepared in response to an agreement between the US Department of Energy, the US Environmental Protection Agency, and the Washington State Department of Ecology, as documented in Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994). The agreement also requires that, following completion of the activities described in this test plan, a 200-UP-1 Operable Unit interim remedial measure (IRM) proposed plan be developed for use in preparing an interim action record of decision (ROD). The IRM Proposed Plan will be supported by the results of the testing described in this treatability test plan, as well as by other 200-UP-1 Operable Unit activities (e.g., limited field investigation, development of a qualitative risk assessment). Once issued, the interim action ROD will specify the interim action for groundwater contamination at the 200-UP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-UP-1 Operable Unit. Primary contaminants of concern are uranium and technetium-99; the secondary contaminant of concern is nitrate. The pilot-scale treatability testing presented in this test plan has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants in groundwater withdrawn from the contaminant plume

  3. Runway Operations Planning: A Two-Stage Heuristic Algorithm

    Science.gov (United States)

    Anagnostakis, Ioannis; Clarke, John-Paul

    2003-01-01

    The airport runway is a scarce resource that must be shared by different runway operations (arrivals, departures and runway crossings). Given the possible sequences of runway events, careful Runway Operations Planning (ROP) is required if runway utilization is to be maximized. From the perspective of departures, ROP solutions are aircraft departure schedules developed by optimally allocating runway time for departures given the time required for arrivals and crossings. In addition to the obvious objective of maximizing throughput, other objectives, such as guaranteeing fairness and minimizing environmental impact, can also be incorporated into the ROP solution subject to constraints introduced by Air Traffic Control (ATC) procedures. This paper introduces a two stage heuristic algorithm for solving the Runway Operations Planning (ROP) problem. In the first stage, sequences of departure class slots and runway crossings slots are generated and ranked based on departure runway throughput under stochastic conditions. In the second stage, the departure class slots are populated with specific flights from the pool of available aircraft, by solving an integer program with a Branch & Bound algorithm implementation. Preliminary results from this implementation of the two-stage algorithm on real-world traffic data are presented.

  4. An Efficient Missile Loadout Planning Tool for Operational Planners

    Science.gov (United States)

    2017-06-01

    dictionaries to access values for penalties and feasibility checks. VBA user-defined types are created to identify the base set of missions and base...Missile Defense TLAM Tomahawk Land Attack Missiles TSC Tomahawk Strike Coordinator USN United States Navy VBA Visual Basic for Applications VLP... accessible and usable form, we can start basing our loadouts on actual operational plans (OPLAN) and concept plans (CONPLAN). This will give fleet

  5. ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

    Science.gov (United States)

    Hall, Timothy A.; Clancey, William J.; McDonald, Aaron; Toschlog, Jason; Tucker, Tyson; Khan, Ahmed; Madrid, Steven (Eric)

    2011-01-01

    In 2007 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organizations to find ways to reduce the cost of operations for supporting the International Space Station (ISS) in the Mission Control Center (MCC). Each MOD organization was asked to define and execute projects that would help them attain cost reductions by 2012. The MOD Operations Division Flight Planning Branch responded to this challenge by launching several software automation projects that would allow them to greatly improve console operations and reduce ISS console staffing and intern reduce operating costs. These tasks ranged from improving the management and integration mission plan changes, to automating the uploading and downloading of information to and from the ISS and the associated ground complex tasks that required multiple decision points. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture; as well as engaging a previously TRL 4-5 technology developed by Ames Research Center (ARC) that utilized an intelligent agent-based system to manage and automate file traffic flow, archive data, and generate console logs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the goal of eliminating a second full time ISS console support position by 2012. The team will also reduce one long range planning console position by 2014. When complete, these Flight Planning Branch projects will account for the elimination of 3 console positions and a reduction in staffing of 11 engineering personnel (EP) for ISS.

  6. A scientific operations plan for the NASA space telescope. [ground support systems, project planning

    Science.gov (United States)

    West, D. K.; Costa, S. R.

    1975-01-01

    A ground system is described which is compatible with the operational requirements of the space telescope. The goal of the ground system is to minimize the cost of post launch operations without seriously compromising the quality and total throughput of space telescope science, or jeopardizing the safety of the space telescope in orbit. The resulting system is able to accomplish this goal through optimum use of existing and planned resources and institutional facilities. Cost is also reduced and efficiency in operation increased by drawing on existing experience in interfacing guest astronomers with spacecraft as well as mission control experience obtained in the operation of present astronomical spacecraft.

  7. Notional Airspace Operations Demonstration Plan

    Science.gov (United States)

    Trongale, Nicholas A.

    2006-01-01

    The airspace operations demonstration (AOD) is intended to show that the Access 5 Step 1 functional requirements can be met. The demonstration will occur in two phases. The initial on-range phase will be carried out in restricted airspace to demonstrate the cooperative collision avoidance (CCA) functional requirements and to provide risk-reduction for the AOD by allowing the test team to rehearse some elements of the demonstration mission. The CCA system to be used in these flights is based on Automatic Dependent Surveillance-Broadcast (ADS-B) which is a commercially-available system by which airplanes constantly broadcast their current position and altitude to other aircraft and ground resources over a dedicated radio datalink. The final phase will occur in the national airspace (NAS) and will be the formal demonstration of the remainder of the proposed functional requirements. The general objectives of the AOD are as follows: (1) Demonstrate that the UAS can aviate in the NAS (2) Demonstrate that the UAS can navigate in the NAS (3) Demonstrate that the UAS can communicate with the NAS (4) Demonstrate that the UAS can perform selected collision avoidance functions in the NAS (5) Demonstrate that the UAS can evaluate and avoid weather conflicts in the NAS (6) Demonstrate that the UAS can provide adequate command and control in the NAS In addition to the stated objectives, there are a number of goals for the flight demonstration. The demo can be accomplished successfully without achieving these goals, but these goals are to be used as a guideline for preparing for the mission. The goals are: (1) Mission duration of at least 24 hours (2) Loiter over heavy traffic to evaluate the data block issue identified during the Access 5 Airspace Operations Simulations (3) Document the contingency management process and lessons learned (4) Document the coordination process for Ground Control Stations (GCS) handoff (5) Document lessons learned regarding the process of flying in

  8. Application of Grid Planning Method in Drilling-Blasting Operations

    OpenAIRE

    Dambov, Risto; Spasovski, Orce

    2012-01-01

    The problem occurs almost every day in operation and causes troubles to mining engineers. The right performance of drilling-blasting work is important for the successful operation of the entire excavation. The aim of the paper is to point out the importance of planning and how it can contribute to the right organization and make drilling-blasting and other mining activities in mine operations easier. Defining the activities and practical example that has been given are carried out by the u...

  9. National volcanic ash operations plan for aviation

    Science.gov (United States)

    ,; ,

    2007-01-01

    The National Aviation Weather Program Strategic Plan (1997) and the National Aviation Weather Initiatives (1999) both identified volcanic ash as a high-priority informational need to aviation services. The risk to aviation from airborne volcanic ash is known and includes degraded engine performance (including flameout), loss of visibility, failure of critical navigational and operational instruments, and, in the worse case, loss of life. The immediate costs for aircraft encountering a dense plume are potentially major—damages up to $80 million have occurred to a single aircraft. Aircraft encountering less dense volcanic ash clouds can incur longer-term costs due to increased maintenance of engines and external surfaces. The overall goal, as stated in the Initiatives, is to eliminate encounters with ash that could degrade the in-flight safety of aircrews and passengers and cause damage to the aircraft. This goal can be accomplished by improving the ability to detect, track, and forecast hazardous ash clouds and to provide adequate warnings to the aviation community on the present and future location of the cloud. To reach this goal, the National Aviation Weather Program established three objectives: (1) prevention of accidental encounters with hazardous clouds; (2) reduction of air traffic delays, diversions, or evasive actions when hazardous clouds are present; and (3) the development of a single, worldwide standard for exchange of information on airborne hazardous materials. To that end, over the last several years, based on numerous documents (including an OFCMsponsored comprehensive study on aviation training and an update of Aviation Weather Programs/Projects), user forums, and two International Conferences on Volcanic Ash and Aviation Safety (1992 and 2004), the Working Group for Volcanic Ash (WG/VA), under the OFCM-sponsored Committee for Aviation Services and Research, developed the National Volcanic Ash Operations Plan for Aviation and Support of the

  10. Nevada test site radionuclide inventory and distribution: project operations plan

    International Nuclear Information System (INIS)

    Kordas, J.F.; Anspaugh, L.R.

    1982-01-01

    This document is the operational plan for conducting the Radionuclide Inventory and Distribution Program (RIDP) at the Nevada Test Site (NTS). The basic objective of this program is to inventory the significant radionuclides of NTS origin in NTS surface soil. The expected duration of the program is five years. This plan includes the program objectives, methods, organization, and schedules

  11. Transformation of TNT to Triaminotoluene by Mixed Cultures Incubated Under Methanogenic Conditions

    National Research Council Canada - National Science Library

    Hwang, Philip

    1998-01-01

    ...), and demilitarization operations. Granular activated carbon adsorption is the standard technology for treating wastewater containing TNT and maintaining discharges within the limits established under the National Pollutant Discharge Elimination System...

  12. 1997 Operating plan for the Office of International Health Programs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    One year ago, the Office of International Health Programs provided you with our 1996 Operating Plan, which defined our ideas and ideals for conducting business in 1996. We have again this year undertaken an intensive planning effort, first reviewing our accomplishments and shortcomings during 1996, and then developing plans and priorities for the upcoming year, taking into account input from customers and outside review panels, and ensuring that the demands on the office have been balanced with anticipated human, financial, and material resources.

  13. Treatability test plan for the 200-ZP-1 operable unit

    International Nuclear Information System (INIS)

    1994-07-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-ZP-1 Operable Unit. The approach discussed in this treatability test plan is to conduct a pilot-scale pump and treat test for the contaminant plume associated with the 200-ZP-1 Operable Unit. The primary contaminants of concern are carbon tetrachloride, chloroform, and trichloroethylene (TCE). The pilot-scale treatability testing has as its primary purpose to assess the performance of aboveground treatment systems with respect to the ability to remove the primary contaminants present in groundwater withdrawn from the contaminant plume. The overall scope of this test plan includes: description of the pump and treat system to be tested, as well as the test performance objectives and data quality objectives (DQOs) that will be used to evaluate the effectiveness of the pilot-scale treatment system; discussion of the treatment technology to be tested and supporting development activities, including process flow and conceptual design descriptions and equipment, fabrication, utility, and system startup needs; description of pilot-scale treatment system performance, operating procedures, and operational controls, as well as anticipated monitoring activities, analytes, parameters, analytical procedures, and quality assurance protocols; summaries of other related treatability testing elements, including personnel and environmental health and safety controls, process and secondary waste management and disposition, schedule, and program organization

  14. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in this test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are 99 Tc and 60 Co for underwater affected by past discharges to the 216-BY Cribs, and 90 Sr, 239/240 Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes

  15. Microgrids and distributed generation systems: Control, operation, coordination and planning

    Science.gov (United States)

    Che, Liang

    Distributed Energy Resources (DERs) which include distributed generations (DGs), distributed energy storage systems, and adjustable loads are key components in microgrid operations. A microgrid is a small electric power system integrated with on-site DERs to serve all or some portion of the local load and connected to the utility grid through the point of common coupling (PCC). Microgrids can operate in both grid-connected mode and island mode. The structure and components of hierarchical control for a microgrid at Illinois Institute of Technology (IIT) are discussed and analyzed. Case studies would address the reliable and economic operation of IIT microgrid. The simulation results of IIT microgrid operation demonstrate that the hierarchical control and the coordination strategy of distributed energy resources (DERs) is an effective way of optimizing the economic operation and the reliability of microgrids. The benefits and challenges of DC microgrids are addressed with a DC model for the IIT microgrid. We presented the hierarchical control strategy including the primary, secondary, and tertiary controls for economic operation and the resilience of a DC microgrid. The simulation results verify that the proposed coordinated strategy is an effective way of ensuring the resilient response of DC microgrids to emergencies and optimizing their economic operation at steady state. The concept and prototype of a community microgrid that interconnecting multiple microgrids in a community are proposed. Two works are conducted. For the coordination, novel three-level hierarchical coordination strategy to coordinate the optimal power exchanges among neighboring microgrids is proposed. For the planning, a multi-microgrid interconnection planning framework using probabilistic minimal cut-set (MCS) based iterative methodology is proposed for enhancing the economic, resilience, and reliability signals in multi-microgrid operations. The implementation of high-reliability microgrids

  16. Radiation safety analysis and action plans for NSRRC top-up operation

    International Nuclear Information System (INIS)

    Wang, J.-P.; Sheu, R.-J.; Liu, Joseph C.; Chen, C.-R.; Chang, F.-D.; Kao, S.-P.

    2006-01-01

    This paper summarizes the radiation safety analysis and action plans for the upcoming top-up operation at the National Synchrotron Radiation Research Center (NSRRC). Electron beam loss scenarios and consequence of beam lifetime and injection efficiency have been studied. Dose assessment was conducted based on measurement and Monte Carlo simulation results. Radiation safety action plans such as upgrading the shielding of the injection section, enlarging the exclusion zones of the straight section beamlines, installing new interlock system for top-up operation and most importantly improving the injection efficiency have been scheduled. The goal is to keep present dose limit of 2 mSv/y and make top-up operation feasible at normal user's run of year 2006

  17. Network Operations Support Plan for the Spot 2 mission (revision 1)

    Science.gov (United States)

    Werbitzky, Victor

    1989-01-01

    The purpose of this Network Operations Support Plan (NOSP) is to indicate operational procedures and ground equipment configurations for the SPOT 2 mission. The provisions in this document take precedence over procedures or configurations in other documents.

  18. A motion-planning method for dexterous hand operating a tool based on bionic analysis

    Directory of Open Access Journals (Sweden)

    Wei Bo

    2017-01-01

    Full Text Available In order to meet the needs of robot’s operating tools for different types and sizes, the dexterous hand is studied by many scientific research institutions. However, the large number of joints in a dexterous hand leads to the difficulty of motion planning. Aiming at this problem, this paper proposes a planning method abased on BPNN inspired by human hands. Firstly, this paper analyses the structure and function of the human hand and summarizes its typical strategy of operation. Secondly, based on the manual operation strategy, the tools are classified according to the shape and the operation mode of the dexterous hand is presented. Thirdly, the BPNN is used to train the humanoid operation, and then output the operation plan. Finally, the simulating experiments of grasping simple tools and operating complex tools are made by MATLAB and ADAMS. The simulation verifies the effectiveness of this method.

  19. LANDSAT-D ground segment operations plan, revision A

    Science.gov (United States)

    Evans, B.

    1982-01-01

    The basic concept for the utilization of LANDSAT ground processing resources is described. Only the steady state activities that support normal ground processing are addressed. This ground segment operations plan covers all processing of the multispectral scanner and the processing of thematic mapper through data acquisition and payload correction data generation for the LANDSAT 4 mission. The capabilities embedded in the hardware and software elements are presented from an operations viewpoint. The personnel assignments associated with each functional process and the mechanisms available for controlling the overall data flow are identified.

  20. Plan for the Initiation of HA-211 Furnace Operations at the Plutonium Finishing Plan (PFP)

    International Nuclear Information System (INIS)

    WILLIS, H.T.

    2000-01-01

    This plan provides a phased approach authorizing the use of three additional muffle furnaces for thermal stabilization. Achievement of Thermal Stabilization mission elements require the installation and startup of three additional muffle furnaces for the thermal stabilization of plutonium and plutonium bearing materials at the Plutonium Finishing Plant (PFP). The release to operate these additional furnaces will require an Activity Based Startup Review. The conduct of the Activity Based Startup Review (ABSR) was approved by Fluor Daniel Hanford on October 15, 1999. This plan has been developed with the objective of identifying those activities needed to guide the controlled startup of five furnaces from authorization to unrestricted operations by adding the HA-211 furnaces in an orderly and safe manner after the approval to Startup has been given

  1. Tactical and operational decisions for operating room planning: efficiency and welfare implications.

    Science.gov (United States)

    Testi, Angela; Tànfani, Elena

    2009-12-01

    In this paper, we evaluate the impact on welfare implications of a 0-1 linear programming model to solve the Operating Room (OR) planning problem, taking a patient perspective. In particular, given a General Surgery Department made up of different surgical sub-specialties sharing a given number of OR block times, the model determines, during a given planning period, the allocation of those blocks to surgical sub-specialties, i.e. the so called Master Surgical Schedule Problem (MSSP), together with the subsets of elective patients to be operated on in each block time, i.e. the so called Surgical Case Assignment Problem (SCAP). The innovation of the model is two-fold. The first is that OR allocation is "optimal" if the available OR blocks are scheduled simultaneously to the proper subspecialty, at the proper time to the proper patient. The second is defining what "proper" means and include that in the objective function. In our approach what is important is not number of patients who can be treated in a given period but how much welfare loss, due to clinical deterioration or other negative consequences related to excessive waiting, can be prevented. In other words we assume a societal perspective in that we focus on "outcome" (health improving or preventing from worsening) rather than on "output" (delivered procedures). The model can be used both to develop weekly OR planning with given resources (operational decision), and to perform "what if" scenario analysis regarding how to increase the amount of OR time available for the entire department (tactical decision). The model performance is verified by applying it to a real scenario, the elective admissions of the General Surgery Department of the San Martino University Hospital in Genova (Italy). Despite the complexity of this NP-hard combinatorial optimization problem, computational results indicate that the model can solve all test problems within 600 s and an average optimality tolerance of less than 0.01%.

  2. The Operational Planning Model of Transhipment Processes in the Port

    Directory of Open Access Journals (Sweden)

    Mia Jurjević

    2016-04-01

    Full Text Available Modelling of a traffic system refers to the efficiency of operations for establishing successful business performance by examining the possibilities for its improvement. The main purpose of each container terminal is to ensure continuity and dynamics of the flow of containers. The objective of this paper is to present a method for determining the amount of certain types of containers that can be transhipped at each berth, with the proper cargo handling, taking into account minimum total costs of transhipment. The mathematical model of planning the transhipment and transportation of containers at the terminal is presented. The optimal solution, obtained with the method of linear programming, represents a plan for container deployment that will ensure effective ongoing process of transhipment, providing the lowest transhipment costs. The proposed model, tested in the port of Rijeka, should be the basis for makingadequate business decisions in the operational planning of the container terminal.

  3. KSC ground operations planning for Space Station

    Science.gov (United States)

    Lyon, J. R.; Revesz, W., Jr.

    1993-01-01

    At the Kennedy Space Center (KSC) in Florida, processing facilities are being built and activated to support the processing, checkout, and launch of Space Station elements. The generic capability of these facilities will be utilized to support resupply missions for payloads, life support services, and propellants for the 30-year life of the program. Special Ground Support Equipment (GSE) is being designed for Space Station hardware special handling requirements, and a Test, Checkout, and Monitoring System (TCMS) is under development to verify that the flight elements are ready for launch. The facilities and equipment used at KSC, along with the testing required to accomplish the mission, are described in detail to provide an understanding of the complexity of operations at the launch site. Assessments of hardware processing flows through KSC are being conducted to minimize the processing flow times for each hardware element. Baseline operations plans and the changes made to improve operations and reduce costs are described, recognizing that efficient ground operations are a major key to success of the Space Station.

  4. NRC plan for cleanup operations at Three Mile Island Unit 2

    International Nuclear Information System (INIS)

    Lo, R.; Snyder, B.

    1982-02-01

    This NRC Plan, which defines NRC's functional role in cleanup operations at Three Mile Island Unit 2 and outlines NRC's regulatory responsibilities in fulfilling this role, is the first revision to the initial plan issued in July 1980 (NUREG-0698). Since 1980, a number of policy developments have occurred which will have an impact on the course of cleanup operations. This revision reflects these developments in the area of NRC's review and approval process with regard to cleanup operations as well as NRC's interface with the Department of Energy's involvement in the cleanup and waste disposal. This revision is also intended to update the cleanup schedule by presenting the cleanup progress that has taken place and NRC's role in ongoing and future cleanup activities

  5. Foresight for commanders: a methodology to assist planning for effects-based operations

    Science.gov (United States)

    Davis, Paul K.; Kahan, James P.

    2006-05-01

    Looking at the battlespace as a system of systems is a cornerstone of Effects-Based Operations and a key element in the planning of such operations, and in developing the Commander's Predictive Environment. Instead of a physical battleground to be approached with weapons of force, the battlespace is an interrelated super-system of political, military, economic, social, information and infrastructure systems to be approached with diplomatic, informational, military and economic actions. A concept that has proved useful in policy arenas other than defense, such as research and development for information technology, addressing cybercrime, and providing appropriate and cost-effective health care, is foresight. In this paper, we provide an overview of how the foresight approach addresses the inherent uncertainties in planning courses of action, present a set of steps in the conduct of foresight, and then illustrate the application of foresight to a commander's decision problem. We conclude that foresight approach that we describe is consistent with current doctrinal intelligence preparation of the battlespace and operational planning, but represents an advance in that it explicitly addresses the uncertainties in the environment and planning in a way that identifies strategies that are robust over different possible ground truths. It should supplement other planning methods.

  6. Engineering Task Plan to Expand the Environmental Operational Envelope of Core Sampling

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This Engineering Task Plan authorizes the development of an Alternative Generation and Analysis (AGA). The AGA will determine how to expand the environmental operating envelope during core sampling operations

  7. Enterprise Resource Planning, Operations and Management

    DEFF Research Database (Denmark)

    Hald, Kim Sundtoft; Mouritsen, Jan

    2013-01-01

    Purpose – This research aims to explore the enabling and constraining effects of enterprise resource planning (ERP) systems and speculate on how these can be linked to the four generic roles of operations management (OM) proposed by Slack et al. Design/methodology/approach – This research...... are linked conceptually. Based on the identified effects of ERP, the paper speculates on the managerial tasks of the production and operations manager (POM) in an ERP environment and lists a set of central concerns of potential relevance to POM and to future research. Research limitations...... for practicing POMs in managing the implementation and design of ERP to support the different domains of OM. Originality/value – Current studies of the effects of ERP and their link to the practice of OM tend to focus on one or a few roles of the emerging system. Such studies do not properly take into account...

  8. IUS/TUG orbital operations and mission support study. Volume 4: Project planning data

    Science.gov (United States)

    1975-01-01

    Planning data are presented for the development phases of interim upper stage (IUS) and tug systems. Major project planning requirements, major event schedules, milestones, system development and operations process networks, and relevant support research and technology requirements are included. Topics discussed include: IUS flight software; tug flight software; IUS/tug ground control center facilities, personnel, data systems, software, and equipment; IUS mission events; tug mission events; tug/spacecraft rendezvous and docking; tug/orbiter operations interface, and IUS/orbiter operations interface.

  9. Optimal, Risk-based Operation and Maintenance Planning for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2008-01-01

    For offshore wind turbines costs to operation and maintenance are substantial. This paper describes a risk-based life-cycle approach for optimal planning of operation and maintenance. The approach is based on pre-posterior Bayesian decision theory. Deterioration mechanisms such as fatigue...

  10. Field Demonstration/Validation of Electrolytic Barriers for Energetic Compounds at Pueblo Chemical Depot

    Science.gov (United States)

    2010-01-01

    measuring the intensity of fluorescence at 517 nm using an Ocean Optics USB-2000TM spectrometer and an Ocean OpticsTM custom six-around-one fiber ...Umatilla Army Depot, OR Demilitarization (washout) Basalt Deep (>50 feet) NRC (2005) Installation Action Plan for UAAP March 2001 Hawthorne

  11. MIPPA: First Broad Changes to Medicare Part D Plan Operations.

    Science.gov (United States)

    LeMasurier, Jean D; Edgar, Babette

    2009-04-01

    In July 2008, as part of broad Medicare reform, Congress passed the first major legislative changes to Medicare Part D since its enactment in 2003-the Medicare Improvements for Patients and Providers Act. This new legislation has significant implications for how Part D plans can market and enroll Medicare beneficiaries. The new legislation also strengthened beneficiary protections, expanded the low-income subsidy provisions originally included in Part D, and expanded Part D coverage. These changes have significant implications for the operation of Part D plans and can affect those involved in benefit design, including specialty pharmacy coverage. This article discusses the major changes that took effect on January 1, 2009, and have immediate implications for Part D plan sponsors, including Medicare Advantage plans and stand-alone prescription drug plans.

  12. Phase Zero Contracting Operations-Strategic and Integrative Planning for Contingency and Expeditionary Operations

    Science.gov (United States)

    2013-10-01

    Annex W plan may utilize strength, weakness, opportunity, threat ( SWOT ) and capability gap analysis techniques. The SWOT method allows the IPE to...accountability and performance, the authors contend that international military organizations will benefit by incorporating Phase Zero Contracting Operations...analytical areas, such as OPLAN analysis , logistics assessments, contracting, and similar professional disciplines. Of note, most organizations do

  13. Migrant and Seasonal Agricultural Worker Protection Act: Forestry contractors' model operating plan

    Science.gov (United States)

    Dan Bremer

    2007-01-01

    The Model Operating Plan for forestry contractors is a voluntary plan for compliance with the Migrant and Seasonal Agricultural Worker Protection Act (MSPA) of 1983, with amendments passed in 1996 and 1997. This plan is designed as a guide for forestry contractors who wish to comply with all federal, state, and local rules and regulations that govern their employer/...

  14. Evolving from Planning and Scheduling to Real-Time Operations Support: Design Challenges

    Science.gov (United States)

    Marquez, Jessica J.; Ludowise, Melissa; McCurdy, Michael; Li, Jack

    2010-01-01

    Versions of Scheduling and Planning Interface for Exploration (SPIFe) have supported a variety of mission operations across NASA. This software tool has evolved and matured over several years, assisting planners who develop intricate schedules. While initially conceived for surface Mars missions, SPIFe has been deployed in other domains, where people rather than robotic explorers, execute plans. As a result, a diverse set of end-users has compelled growth in a new direction: supporting real-time operations. This paper describes the new needs and challenges that accompany this development. Among the key features that have been built for SPIFe are current time indicators integrated into the interface and timeline, as well as other plan attributes that enable execution of scheduled activities. Field tests include mission support for the Lunar CRater Observation and Sensing Satellite (LCROSS), NASA Extreme Environment Mission Operations (NEEMO) and Desert Research and Technology Studies (DRATS) campaigns.

  15. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  16. Optimizing Re-planning Operation for Smart House Applying Solar Radiation Forecasting

    Directory of Open Access Journals (Sweden)

    Atsushi Yona

    2014-08-01

    Full Text Available This paper proposes the re-planning operation method using Tabu Search for direct current (DC smart house with photovoltaic (PV, solar collector (SC, battery and heat pump system. The proposed method is based on solar radiation forecasting using reported weather data, Fuzzy theory and Recurrent Neural Network. Additionally, the re-planning operation method is proposed with consideration of solar radiation forecast error, battery and inverter losses. In this paper, it is assumed that the installation location for DC smart house is Okinawa, which is located in Southwest Japan. The validity of proposed method is confirmed by comparing the simulation results.

  17. Daya Bay Nuclear Power Station five-year business plan and operating results

    International Nuclear Information System (INIS)

    Zhang Shanming

    2000-01-01

    Guangdong Nuclear Power Joint Venture Company, Ltd. first 5-Year Business Plan (hereinafter referred to as 5-Year Business Plan) serves as guidance of both the operations and management of the company. Continuous performance improvement of the nuclear power station has been achieved through the fulfillment of goals and improvement plan defined by the 5-Year Business Plan, and through standard and systematic management. Daya Bay Nuclear Power Station (GNPS) has made great contributions to sustainable economic developments of both Guangdong and Hong Kong since its commercial operation in 1994. As of the end of 1999, the cumulative off-take electricity generated by GNPS had reached 69.9 billion kWh. Of the WANO indicators universally applied by nuclear power industry throughout the world, 6 indicators of Daya Bay performance entered the world top quartile while 9 the medium level

  18. Instrumentation and operational plan for geokinetics retort No. 22

    Energy Technology Data Exchange (ETDEWEB)

    Parrish, R.L.; Hommert, P.J.

    1980-04-01

    This report outlines the general plan for the instrumentation and technical direction of a horizontal in siti retorting experiment to be conducted at the Geokinetics, Inc. field site in Uintah County, Utah. Bed preparation has been accomplished by Geokinetics by blasting the retort zone with explosives emplaced in wells drilled from the surface. Downhole instrumentation will consist of approx. 300 thermocouples and 28 combustion gas sampling ports to monitor the movement of the reaction front during the retorting process. Surface instrumentation will provide measurements of flow rates, gas composition, liquid products and other process parameters to monitor the overall operation of the process. The operational plan includes provision for data interpretation and real time material balance calculations in the field, including an evaluation of the effect on processing rates and oil yield due to the use of recycled combusted off gases and changes in rate of injection of inlet gases.

  19. Planning low-carbon electricity systems under uncertainty considering operational flexibility and smart grid technologies.

    Science.gov (United States)

    Moreno, Rodrigo; Street, Alexandre; Arroyo, José M; Mancarella, Pierluigi

    2017-08-13

    Electricity grid operators and planners need to deal with both the rapidly increasing integration of renewables and an unprecedented level of uncertainty that originates from unknown generation outputs, changing commercial and regulatory frameworks aimed to foster low-carbon technologies, the evolving availability of market information on feasibility and costs of various technologies, etc. In this context, there is a significant risk of locking-in to inefficient investment planning solutions determined by current deterministic engineering practices that neither capture uncertainty nor represent the actual operation of the planned infrastructure under high penetration of renewables. We therefore present an alternative optimization framework to plan electricity grids that deals with uncertain scenarios and represents increased operational details. The presented framework is able to model the effects of an array of flexible, smart grid technologies that can efficiently displace the need for conventional solutions. We then argue, and demonstrate via the proposed framework and an illustrative example, that proper modelling of uncertainty and operational constraints in planning is key to valuing operationally flexible solutions leading to optimal investment in a smart grid context. Finally, we review the most used practices in power system planning under uncertainty, highlight the challenges of incorporating operational aspects and advocate the need for new and computationally effective optimization tools to properly value the benefits of flexible, smart grid solutions in planning. Such tools are essential to accelerate the development of a low-carbon energy system and investment in the most appropriate portfolio of renewable energy sources and complementary enabling smart technologies.This article is part of the themed issue 'Energy management: flexibility, risk and optimization'. © 2017 The Author(s).

  20. New York State intelligent transportation system commercial vehicle operations (CVO) : business plan

    Science.gov (United States)

    1998-07-01

    The purpose of this Business Plan is to describe the major Intelligent Transportation System (ITS) initiatives and projects in the area of Commercial Vehicle Operations (CVO) that have recently been or are planned to be undertaken in New York State b...

  1. Double Star project - master science operations plan

    Science.gov (United States)

    Shen, C.; Liu, Z.

    2005-11-01

    For Double Star Project (DSP) exploration, the scientific operations are very important and essential for achieving its scientific objectives. Two years before the launch of the DSP satellites (TC-1 and TC-2) and during the mission operating phase, the long-term and short-term master science operations plans (MSOP) were produced. MSOP is composed of the operation schedules of all the scientific instruments, the modes and timelines of the Payload Service System on TC-1 and TC-2, and the data receiving schedules of the three ground stations. The MSOP of TC-1 and TC-2 have been generated according to the scientific objectives of DSP, the orbits of DSP, the near-Earth space environments and the coordination with Cluster, etc., so as to make full use of the exploration resources provided by DSP and to acquire as much quality scientific data as possible for the scientific communities. This paper has summarized the observation resources of DSP, the states of DSP and its evolution since the launch, the strategies and rules followed for operating the payload and utilizing the ground stations, and the production of MSOP. Until now, the generation and execution of MSOP is smooth and successful, the operating of DSP is satisfactory, and most of the scientific objectives of DSP have been fulfilled.

  2. Double Star project - master science operations plan

    Directory of Open Access Journals (Sweden)

    C. Shen

    2005-11-01

    Full Text Available For Double Star Project (DSP exploration, the scientific operations are very important and essential for achieving its scientific objectives. Two years before the launch of the DSP satellites (TC-1 and TC-2 and during the mission operating phase, the long-term and short-term master science operations plans (MSOP were produced. MSOP is composed of the operation schedules of all the scientific instruments, the modes and timelines of the Payload Service System on TC-1 and TC-2, and the data receiving schedules of the three ground stations. The MSOP of TC-1 and TC-2 have been generated according to the scientific objectives of DSP, the orbits of DSP, the near-Earth space environments and the coordination with Cluster, etc., so as to make full use of the exploration resources provided by DSP and to acquire as much quality scientific data as possible for the scientific communities. This paper has summarized the observation resources of DSP, the states of DSP and its evolution since the launch, the strategies and rules followed for operating the payload and utilizing the ground stations, and the production of MSOP. Until now, the generation and execution of MSOP is smooth and successful, the operating of DSP is satisfactory, and most of the scientific objectives of DSP have been fulfilled.

  3. System Safety Program Plan for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boos, K.A.

    1996-01-01

    This System Safety Program Plan (SSPP) outlines the safety analysis strategy for project W-314, ''Tank Farm Restoration and Safe Operations.'' Project W-314 will provide capital improvements to Hanford's existing Tank Farm facilities, with particular emphasis on infrastructure systems supporting safe operation of the double-shell activities related to the project's conceptual Design Phase, but is planned to be updated and maintained as a ''living document'' throughout the life of the project to reflect the current safety analysis planning for the Tank Farm Restoration and Safe Operations upgrades. This approved W-314 SSPP provides the basis for preparation/approval of all safety analysis documentation needed to support the project

  4. Integrated Assessment Plan Template and Operational Demonstration for SPIDERS Phase 2: Fort Carson

    Energy Technology Data Exchange (ETDEWEB)

    Barr, Jonathan L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tuffner, Francis K. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hadley, Mark D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kreyling, Sean J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Schneider, Kevin P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-09-01

    This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collected from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).

  5. Stability and Reconstruction Operations Planning: Embrace Before Pursuing the Interagency

    National Research Council Canada - National Science Library

    Pazos, Rafael F

    2006-01-01

    .... government was the cause of poor SRO planning and execution. However, detailed analysis of the nature of military operations, the military's responsibilities, and the limited capacity of agencies within the U.S...

  6. U.S. Military Operations in Iraq: Planning, Combat, and Occupation

    National Research Council Canada - National Science Library

    Phillips, Kate; Lauth, Shane; Schenck, Erin

    2006-01-01

    On November 2, 2005, a colloquium entitled "U.S. Military Operations in Iraq: Planning, Combat and Occupation" was held in Washington, DC, at the Johns Hopkins School of Advanced International Studies (SAIS...

  7. Risk Assessment Using The Homeland-Defense Operational Planning System (HOPS)

    International Nuclear Information System (INIS)

    Durling, R L; Price, D E; Spero, K K

    2005-01-01

    For over ten years, the Counterproliferation Analysis and Planning System (CAPS) at Lawrence Livermore National Laboratory (LLNL) has been a planning tool used by U.S. combatant commands for mission support planning against foreign programs engaged in the manufacture of weapons of mass destruction (WMD). CAPS is endorsed by the Secretary of Defense as the preferred counterproliferation tool to be used by the nation's armed services. A sister system, the Homeland-Defense Operational Planning System (HOPS), is a new operational planning tool leveraging CAPS expertise designed to support the defense of the U.S. homeland. HOPS provides planners with a basis to make decisions to protect against acts of terrorism, focusing on the defense of facilities critical to U.S. infrastructure. Criticality of facilities, structures, and systems is evaluated on a composite matrix of specific projected casualty, economic, and sociopolitical impact bins. Based on these criteria, significant unidentified vulnerabilities are identified and secured. To provide insight into potential successes by malevolent actors, HOPS analysts strive to base their efforts mainly on unclassified open-source data. However, more cooperation is needed between HOPS analysts and facility representatives to provide an advantage to those whose task is to defend these facilities. Evaluated facilities include: refineries, major ports, nuclear power plants and other nuclear licensees, dams, government installations, convention centers, sports stadiums, tourist venues, and public and freight transportation systems. A generalized summary of analyses of U.S. infrastructure facilities will be presented

  8. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  9. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    The RCRA ampersand Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects ampersand Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC's scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule

  10. Tank Farm Contractor Operation and Utilization Plan [SEC 1 Thru 3

    International Nuclear Information System (INIS)

    KIRKBRIDE, R.A.

    2000-01-01

    This document updates the operating scenario and plans for feed delivery to BNFL Inc. of retrieval and waste from single-shell tanks, and the overall process flowsheets for Phases 1 and 2 of the River Protection Project. The plans and flowsheets are updated with the most recent guidance from ORP and tank-by-tank inventory. The results provide the technical basis for the RTP-2 planning effort. Sensitivity cases were run to evaluate the effect of changes on key parameters

  11. MSFC Doppler Lidar Science experiments and operations plans for 1981 airborne test flight

    Science.gov (United States)

    Fichtl, G. H.; Bilbro, J. W.; Kaufman, J. W.

    1981-01-01

    The flight experiment and operations plans for the Doppler Lidar System (DLS) are provided. Application of DLS to the study of severe storms and local weather penomena is addressed. Test plans involve 66 hours of flight time. Plans also include ground based severe storm and local weather data acquisition.

  12. Application of reliability worth concepts in power system operational planning

    Energy Technology Data Exchange (ETDEWEB)

    Mello, J C.O. [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Silva, A.M. Leite da [Pontificia Univ. Catolica do Rio de Janeiro, RJ (Brazil); Pereira, M V.F. [Power System Research (PSR), Inc., Rio de Janeiro, RJ (Brazil)

    1994-12-31

    This work describes the application of a new methodology for calculating total system interruption costs in power system operational planning. Some important operational aspects are discussed: chronological load curves, customer damage functions for each consumer class, maintenance scheduling and non-exponential repair times. It is also presented the calculation of the probability distribution of the system interruption cost to improve the decision making process associated with alternative operational strategies. The Brazilian Southeastern system is used to illustrate all previous applications. (author) 24 refs., 8 figs., 4 tabs.

  13. 76 FR 43237 - Patient Protection and Affordable Care Act; Establishment of Consumer Operated and Oriented Plan...

    Science.gov (United States)

    2011-07-20

    ... have a choice of health plans to fit their needs. Exchanges will give individuals and small businesses... Protection and Affordable Care Act; Establishment of Consumer Operated and Oriented Plan (CO-OP) Program... implement the Consumer Operated and Oriented Plan (CO-OP) program, which provides loans to foster the...

  14. 75 FR 64683 - Liability for Termination of Single-Employer Plans; Treatment of Substantial Cessation of Operations

    Science.gov (United States)

    2010-10-20

    ... Termination of Single-Employer Plans; Treatment of Substantial Cessation of Operations AGENCY: Pension Benefit... cessations of operations by employers that maintain single-employer plans. DATES: Comments must be submitted... 4062(e), which provides for reporting of and liability for certain substantial cessations of operations...

  15. Impact of Operating Rules on Planning Capacity Expansion of Urban Water Supply Systems

    Science.gov (United States)

    de Neufville, R.; Galelli, S.; Tian, X.

    2017-12-01

    This study addresses the impact of operating rules on capacity planning of urban water supply systems. The continuous growth of metropolitan areas represents a major challenge for water utilities, which often rely on industrial water supply (e.g., desalination, reclaimed water) to complement natural resources (e.g., reservoirs). These additional sources increase the reliability of supply, equipping operators with additional means to hedge against droughts. How do their rules for using industrial water supply impact the performance of water supply system? How might it affect long-term plans for capacity expansion? Possibly significantly, as demonstrated by the analysis of the operations and planning of a water supply system inspired by Singapore. Our analysis explores the system dynamics under multiple inflow and management scenarios to understand the extent to which alternative operating rules for the use of industrial water supply affect system performance. Results first show that these operating rules can have significant impact on the variability in system performance (e.g., reliability, energy use) comparable to that of hydro-climatological conditions. Further analyses of several capacity expansion exercises—based on our original hydrological and management scenarios—show that operating rules significantly affect the timing and magnitude of critical decisions, such as the construction of new desalination plants. These results have two implications: Capacity expansion analysis should consider the effect of a priori uncertainty about operating rules; and operators should consider how their flexibility in operating rules can affect their perceived need for capacity.

  16. SOCAP: Lessons learned in applying SIPE-2 to the military operations crisis action planning domain

    Science.gov (United States)

    Desimone, Roberto

    1992-01-01

    This report describes work funded under the DARPA Planning and Scheduling Initiative that led to the development of SOCAP (System for Operations Crisis Action Planning). In particular, it describes lessons learned in applying SIPE-2, the underlying AI planning technology within SOCAP, to the domain of military operations deliberate and crisis action planning. SOCAP was demonstrated at the U.S. Central Command and at the Pentagon in early 1992. A more detailed report about the lessons learned is currently being prepared. This report was presented during one of the panel discussions on 'The Relevance of Scheduling to AI Planning Systems.'

  17. Searching for Order Within Chaos: Complexity Theorys Implications to Intelligence Support During Joint Operational Planning

    Science.gov (United States)

    2017-06-09

    joint operational planning . 15. SUBJECT TERMS Complexity Theory , Complex Systems Theory , Complex Adaptive Systems, Dynamical Systems, Joint...complexity theory to analyze military problems and increase joint staff understanding of the operational environment during joint operational planning ?” the...13). Complex Systems Theory : “the study of the behavior of [complex adaptive] systems” (Ilachinski 2004, 4). For the purpose of this thesis there is

  18. Hazardous-waste analysis plan for LLNL operations

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, R.S.

    1982-02-12

    The Lawrence Livermore National Laboratory is involved in many facets of research ranging from nuclear weapons research to advanced Biomedical studies. Approximately 80% of all programs at LLNL generate hazardous waste in one form or another. Aside from producing waste from industrial type operations (oils, solvents, bottom sludges, etc.) many unique and toxic wastes are generated such as phosgene, dioxin (TCDD), radioactive wastes and high explosives. One key to any successful waste management program must address the following: proper identification of the waste, safe handling procedures and proper storage containers and areas. This section of the Waste Management Plan will address methodologies used for the Analysis of Hazardous Waste. In addition to the wastes defined in 40 CFR 261, LLNL and Site 300 also generate radioactive waste not specifically covered by RCRA. However, for completeness, the Waste Analysis Plan will address all hazardous waste.

  19. Hazardous-waste analysis plan for LLNL operations

    International Nuclear Information System (INIS)

    Roberts, R.S.

    1982-01-01

    The Lawrence Livermore National Laboratory is involved in many facets of research ranging from nuclear weapons research to advanced Biomedical studies. Approximately 80% of all programs at LLNL generate hazardous waste in one form or another. Aside from producing waste from industrial type operations (oils, solvents, bottom sludges, etc.) many unique and toxic wastes are generated such as phosgene, dioxin (TCDD), radioactive wastes and high explosives. One key to any successful waste management program must address the following: proper identification of the waste, safe handling procedures and proper storage containers and areas. This section of the Waste Management Plan will address methodologies used for the Analysis of Hazardous Waste. In addition to the wastes defined in 40 CFR 261, LLNL and Site 300 also generate radioactive waste not specifically covered by RCRA. However, for completeness, the Waste Analysis Plan will address all hazardous waste

  20. Operational readiness review implementation plan for K Basin sludge water system

    International Nuclear Information System (INIS)

    IRWIN, R.M.

    2003-01-01

    This Implementation Plan (IP) has been prepared consistent with the requirements of U.S. Department of Energy (DOE) Order 425.1B, ''Startup and Restart of Nuclear Facilities'', and DOE-STD-3006-2000, ''Planning and Conduct of Operational Readiness Reviews'' (ORR) (DOE 2002). The scope of the DOE ORR is described in the RL ''Plan of Action, K Basin Sludge Water System'' (Veitenheimer 2003), prepared by DOE project line management and approved by the RL Manager, the designated Approval Authority, on March 20, 2003. The scope of the contractor ORR is described in the contractor ''Plan of Action for the K Basins Sludge Water System Operational Readiness Review'' (FH 2002a) which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on December 19, 2002. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated February 5, 2003 (Roberson 2003). This IP provides the overall approach and guidelines for performance of the DOE ORR. Appendix A contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  1. Improved operational performance through the use of business planning tools

    International Nuclear Information System (INIS)

    Hoelscher, H.L.

    1996-01-01

    Improved operational performance at Point Beach Nuclear Plant is based on a focused business plan. Quantitative goals that compare past performance with the performance of potential competitors are the basis of the business plan. This establishes goals for the nuclear power business unit which support corporate goals. Strategies and objectives are then developed to meet the established goals. To continue support for these strategies and objectives, individual performance plans are developed for all management personnel. These performance management plans identify individual contributor actions to support the goals, and also provide periodic feedback for changes to better prioritize individual actions. Performance criteria are also established to measure progress toward achieving the goals. The author also has a program to provide incentives for improved performance based upon success of the organization in achieving established goals

  2. Safety evaluation by living probabilistic safety assessment. Procedures and applications for planning of operational activities and analysis of operating experience

    International Nuclear Information System (INIS)

    Johanson, Gunnar; Holmberg, J.

    1994-01-01

    Living Probabilistic Safety Assessment (PSA) is a daily safety management system and it is based on a plant-specific PSA and supporting information systems. In the living use of PSA, plant status knowledge is used to represent actual plant safety status in monitoring or follow-up perspective. The PSA model must be able to express the risk at a given time and plant configuration. The process, to update the PSA model to represent the current or planned configuration and to use the model to evaluate and direct the changes in the configuration, is called living PSA programme. The main purposes to develop and increase the usefulness of living PSA are: Long term safety planning: To continue the risk assessment process started with the basic PSA by extending and improving the basic models and data to provide a general risk evaluation tool for analyzing the safety effects of changes in plant design and procedures. Risk planning of operational activities: To support the operational management by providing means for searching optimal operational maintenance and testing strategies from the safety point of view. The results provide support for risk decision making in the short term or in a planning mode. The operational limits and conditions given by technical specifications can be analyzed by evaluating the risk effects of alternative requirements in order to balance the requirements with respect to operational flexibility and plant economy. Risk analysis of operating experience: To provide a general risk evaluation tool for analyzing the safety effects of incidents and plant status changes. The analyses are used to: identify possible high risk situations, rank the occurred events from safety point of view, and get feedback from operational events for the identification of risk contributors. This report describes the methods, models and applications required to continue the process towards a living use of PSA. 19 tabs, 20 figs

  3. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    International Nuclear Information System (INIS)

    1997-01-01

    This Environmental Monitoring Plan was prepared for the US Department of Energy's (DOE's) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan's purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner

  4. Using Micro-Synchrophasor Data for Advanced Distribution Grid Planning and Operations Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, Emma [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Kiliccote, Sila [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); McParland, Charles [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Roberts, Ciaran [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2014-07-01

    This report reviews the potential for distribution-grid phase-angle data that will be available from new micro-synchrophasors (µPMUs) to be utilized in existing distribution-grid planning and operations analysis. This data could augment the current diagnostic capabilities of grid analysis software, used in both planning and operations for applications such as fault location, and provide data for more accurate modeling of the distribution system. µPMUs are new distribution-grid sensors that will advance measurement and diagnostic capabilities and provide improved visibility of the distribution grid, enabling analysis of the grid’s increasingly complex loads that include features such as large volumes of distributed generation. Large volumes of DG leads to concerns on continued reliable operation of the grid, due to changing power flow characteristics and active generation, with its own protection and control capabilities. Using µPMU data on change in voltage phase angle between two points in conjunction with new and existing distribution-grid planning and operational tools is expected to enable model validation, state estimation, fault location, and renewable resource/load characterization. Our findings include: data measurement is outstripping the processing capabilities of planning and operational tools; not every tool can visualize a voltage phase-angle measurement to the degree of accuracy measured by advanced sensors, and the degree of accuracy in measurement required for the distribution grid is not defined; solving methods cannot handle the high volumes of data generated by modern sensors, so new models and solving methods (such as graph trace analysis) are needed; standardization of sensor-data communications platforms in planning and applications tools would allow integration of different vendors’ sensors and advanced measurement devices. In addition, data from advanced sources such as µPMUs could be used to validate models to improve

  5. State of Montana ITS/CVO business plan : intelligent transportation system commercial vehicle operations

    Science.gov (United States)

    1998-01-01

    This plans purpose is to encourage coordinated, efficient and safe commercial vehicle operations throughout Montana, and to promote inter-agency and regional cooperation as ITS/CVO projects are developed and deployed. The Plan discusses Montana...

  6. Forest operations planning by using RTK-GPS based digital elevation model

    Directory of Open Access Journals (Sweden)

    Neşe Gülci

    2015-07-01

    Full Text Available Having large proportion of forests in mountainous terrain in Turkey, the logging methods that not only minimize operational costs but also minimize environmental damages should be determined in forest operations planning. In a case where necessary logging equipment and machines are available, ground slope is the most important factor in determining the logging method. For this reason, accurate, up to date, and precise ground slope data is very crucial in the success of forest operations planning. In recent years, high-resolution Digital Elevation Models (DEM can be generated for forested areas by using Real Time Kinematic (RTK GPS method and these DEMs can be used to develop precise slope maps. In this study, high-resolution DEM was developed by RTK-GPS method to generate precise slope map in a sample area. Then, the slope map was classified into slope classes specified by IUFRO in order to assist forest operations planning. According to the results, logging methods that are suitable for very steep and steep terrain conditions (i.e. skyline logging, cable pulling, and chute systems should be preferred in 48.1% of the study area. It was also found that logging methods that are suitable for terrain with medium slope (i.e. skidding and cable pulling and gentle slope (i.e. skidding and mobile winch should be preferred in 34.1% and 17.8% of the study area, respectively.

  7. Optimal Planning and Operation Management of a Ship Electrical Power System with Energy Storage System

    DEFF Research Database (Denmark)

    Anvari-Moghaddam, Amjad; Dragicevic, Tomislav; Meng, Lexuan

    2016-01-01

    Next generation power management at all scales is highly relying on the efficient scheduling and operation of different energy sources to maximize efficiency and utility. The ability to schedule and modulate the energy storage options within energy systems can also lead to more efficient use...... of the generating units. This optimal planning and operation management strategy becomes increasingly important for off-grid systems that operate independently of the main utility, such as microgrids or power systems on marine vessels. This work extends the principles of optimal planning and economic dispatch...... for the proposed plan is derived based on the solution from a mixed-integer nonlinear programming (MINLP) problem. Simulation results showed that including well-sized energy storage options together with optimal operation management of generating units can improve the economic operation of the test system while...

  8. FCFPYRO simulation of the first year FCF hot operation plan

    International Nuclear Information System (INIS)

    Liaw, J.R.; Li, S.X.; Benedict, R.W.

    1996-01-01

    A simulation study has been successfully completed according to the first year FCF operational plan for the treatment of EBR-II spent fuels. Material flow by nuclides for each processing step and radioactive decays during the process are considered. The FCFPYRO code package is a very useful tool to provide step-by-step information essential to the analysis of operational strategy, process chemistry, heat removal, criticality safety, and radiological health issues in FCF

  9. Orbital Express Mission Operations Planning and Resource Management using ASPEN

    Science.gov (United States)

    Chouinard, Caroline; Knight, Russell; Jones, Grailing; Tran, Danny

    2008-01-01

    The Orbital Express satellite servicing demonstrator program is a DARPA program aimed at developing "a safe and cost-effective approach to autonomously service satellites in orbit". The system consists of: a) the Autonomous Space Transport Robotic Operations (ASTRO) vehicle, under development by Boeing Integrated Defense Systems, and b) a prototype modular next-generation serviceable satellite, NEXTSat, being developed by Ball Aerospace. Flexibility of ASPEN: a) Accommodate changes to procedures; b) Accommodate changes to daily losses and gains; c) Responsive re-planning; and d) Critical to success of mission planning Auto-Generation of activity models: a) Created plans quickly; b) Repetition/Re-use of models each day; and c) Guarantees the AML syntax. One SRP per day vs. Tactical team

  10. [Computer-assisted operational planning for pediatric abdominal surgery. 3D-visualized MRI with volume rendering].

    Science.gov (United States)

    Günther, P; Tröger, J; Holland-Cunz, S; Waag, K L; Schenk, J P

    2006-08-01

    Exact surgical planning is necessary for complex operations of pathological changes in anatomical structures of the pediatric abdomen. 3D visualization and computer-assisted operational planning based on CT data are being increasingly used for difficult operations in adults. To minimize radiation exposure and for better soft tissue contrast, sonography and MRI are the preferred diagnostic methods in pediatric patients. Because of manifold difficulties 3D visualization of these MRI data has not been realized so far, even though the field of embryonal malformations and tumors could benefit from this.A newly developed and modified raycasting-based powerful 3D volume rendering software (VG Studio Max 1.2) for the planning of pediatric abdominal surgery is presented. With the help of specifically developed algorithms, a useful surgical planning system is demonstrated. Thanks to the easy handling and high-quality visualization with enormous gain of information, the presented system is now an established part of routine surgical planning.

  11. Computer-assisted operational planning for pediatric abdominal surgery. 3D-visualized MRI with volume rendering

    International Nuclear Information System (INIS)

    Guenther, P.; Holland-Cunz, S.; Waag, K.L.

    2006-01-01

    Exact surgical planning is necessary for complex operations of pathological changes in anatomical structures of the pediatric abdomen. 3D visualization and computer-assisted operational planning based on CT data are being increasingly used for difficult operations in adults. To minimize radiation exposure and for better soft tissue contrast, sonography and MRI are the preferred diagnostic methods in pediatric patients. Because of manifold difficulties 3D visualization of these MRI data has not been realized so far, even though the field of embryonal malformations and tumors could benefit from this. A newly developed and modified raycasting-based powerful 3D volume rendering software (VG Studio Max 1.2) for the planning of pediatric abdominal surgery is presented. With the help of specifically developed algorithms, a useful surgical planning system is demonstrated. Thanks to the easy handling and high-quality visualization with enormous gain of information, the presented system is now an established part of routine surgical planning. (orig.) [de

  12. NASA Planning for Orion Multi-Purpose Crew Vehicle Ground Operations

    Science.gov (United States)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    The NASA Orion Ground Processing Team was originally formed by the Kennedy Space Center (KSC) Constellation (Cx) Project Office's Orion Division to define, refine and mature pre-launch and post-landing ground operations for the Orion human spacecraft. The multidisciplined KSC Orion team consisted of KSC civil servant, SAIC, Productivity Apex, Inc. and Boeing-CAPPS engineers, project managers and safety engineers, as well as engineers from Constellation's Orion Project and Lockheed Martin Orion Prime contractor. The team evaluated the Orion design configurations as the spacecraft concept matured between Systems Design Review (SDR), Systems Requirement Review (SRR) and Preliminary Design Review (PDR). The team functionally decomposed prelaunch and post-landing steps at three levels' of detail, or tiers, beginning with functional flow block diagrams (FFBDs). The third tier FFBDs were used to build logic networks and nominal timelines. Orion ground support equipment (GSE) was identified and mapped to each step. This information was subsequently used in developing lower level operations steps in a Ground Operations Planning Document PDR product. Subject matter experts for each spacecraft and GSE subsystem were used to define 5th - 95th percentile processing times for each FFBD step, using the Delphi Method. Discrete event simulations used this information and the logic network to provide processing timeline confidence intervals for launch rate assessments. The team also used the capabilities of the KSC Visualization Lab, the FFBDs and knowledge of the spacecraft, GSE and facilities to build visualizations of Orion pre-launch and postlanding processing at KSC. Visualizations were a powerful tool for communicating planned operations within the KSC community (i.e., Ground Systems design team), and externally to the Orion Project, Lockheed Martin spacecraft designers and other Constellation Program stakeholders during the SRR to PDR timeframe. Other operations planning

  13. The Royal Naval Medical Services: delivering medical operational capability. the 'black art' of Medical Operational Planning.

    Science.gov (United States)

    Faye, M

    2013-01-01

    This article looks to dispel the mysteries of the 'black art' of Medical Operational Planning whilst giving an overview of activity within the Medical Operational Capability area of Medical Division (Med Div) within Navy Command Headquarters (NCHQ) during a period when the Royal Naval Medical Services (RNMS) have been preparing and reconfiguring medical capability for the future contingent battle spaces. The rolling exercise program has been used to illustrate the ongoing preparations taken by the Medical Operational Capability (Med Op Cap) and the Medical Force Elements to deliver medical capability in the littoral and maritime environments.

  14. Frequency analysis for planned islanding operation in the Danish distribution system - Bornholm

    DEFF Research Database (Denmark)

    Chen, Yu; Xu, Zhao; Østergaard, Jacob

    2008-01-01

    a planned islanding operation test. To evaluate the test and achieve useful experience for future similar operations in Bornholm or even in other similar systems, the frequency data before, during and after this period, were recorded by Phasor Measurement Units (PMUs), supplied by Centre for Electric...

  15. Zero Gravity Flights as the Most Effective Embryonic Operation for Planned Commercial Spaceport

    Science.gov (United States)

    Abu Samah, Shamsul Kamar; Ridzuan Zakaria, Norul; Nasrun, Nasri; Abu, Jalaluddin; Muszaphar Shukor, Dato'Sheikh

    2013-09-01

    From the experience gained by the management team of Spaceport Malaysia, a popular service that can be provided by a planned commercial spaceport in a country without existing space travel infrastructure are zero gravity flights. Zero gravity flights range from parabolic flights using aerobatic airplane to suborbital flights using rockets, and in the near future using suborbital rocketplanes. Therefore, zero gravity flights can be operated from a certified runway or planned for operation at a future commercial spaceport. With such range of operation, zero gravity flights provide a natural link between a low cost operation of small airplane to exclusive high profile operation of suborbital rocketplane, and this attracts the attention of individuals and organizations that are planning for the establishment of a commercial spaceport. This is the approach chosen by the planners and developers of Spaceport Malaysia. A significant factor in zero gravity flight is the zero gravity time, the period where the payload onboard the airplane or rocketplane will experience zero gravity. Based on the momentum of the airplane or rocketplane, the zero gravity time may vary from few seconds to few minutes and that determines the quality of the zero gravity flight. To achieve zero gravity, the airplane or rocketplane will fly with a steady velocity for a significant time as a gravity control flight, accelerate upwards with an angle producing hypergravity and perform parabolic flight with natural momentum producing zero gravity and followed by dive that will result in another hypergravity flight. 2 zero gravity platforms being considered for operation at and by Spaceport Malaysia are F-5E Tiger II and Airbus A300, since both platforms have been successfully used by a partner of Spaceport Malaysia in performing zero gravity flights. An F-5E fighter jet owned by Royal Malaysian Air Force is being planned to be converted into a zero gravity platform to be operated at and by Spaceport

  16. Foreword for the Special Section on Power System Planning and Operation Towards a Low-Carbon Economy

    Energy Technology Data Exchange (ETDEWEB)

    Ding, Yi; Kang, Chongqing; Wang, Jianhui; Chen, Yihsu; Hobbs, Benjamin F.

    2015-03-01

    The nine papers in this special section on power system planning and operation towards a low-cost economy cover the following topics: power system planning models; power system operation methods and market behavior analysis; and risk assessment and emission management.

  17. Reliability-Based Planning of Inspection, Operation and Maintenance for Offshore Oil & Gas Structures and Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2011-01-01

    Reliability-based cost-optimal planning of inspection, maintenance and operation has many applications. In this paper applications for planning of inspections for oil & gas jacket structures and of operation and maintenance of offshore wind turbines are described and illustrated by examples....

  18. Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

    Science.gov (United States)

    Hitz, F. R.

    1976-01-01

    The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

  19. Operations planning and analysis handbook for NASA/MSFC phase B development projects

    Science.gov (United States)

    Batson, Robert C.

    1986-01-01

    Current operations planning and analysis practices on NASA/MSFC Phase B projects were investigated with the objectives of (1) formalizing these practices into a handbook and (2) suggesting improvements. The study focused on how Science and Engineering (S&E) Operational Personnel support Program Development (PD) Task Teams. The intimate relationship between systems engineering and operations analysis was examined. Methods identified for use by operations analysts during Phase B include functional analysis, interface analysis methods to calculate/allocate such criteria as reliability, Maintainability, and operations and support cost.

  20. Application of ConceptDraw Office for planning, documenting, monitoring of operating processes

    International Nuclear Information System (INIS)

    Bocharnikov, O.P.; Savenko, S.V.; Nikiforov, N.S.

    2011-01-01

    ConceptDraw Office allows effectively deciding the following tasks: to carry out planning, designing, control of implementation of production processes; to prepare working documents (engineering diagrams, process flor diagrams, evacuation and emergency plans; to create dashboards with information for organization management; to distribute the organization resources with the purpose of increase of efficiency and safety of operating processes.

  1. Planning and Estimation of Operations Support Requirements

    Science.gov (United States)

    Newhouse, Marilyn E.; Barley, Bryan; Bacskay, Allen; Clardy, Dennon

    2010-01-01

    Life Cycle Cost (LCC) estimates during the proposal and early design phases, as well as project replans during the development phase, are heavily focused on hardware development schedules and costs. Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead to de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Any LCC growth can directly impact the programs' ability to fund new missions, and even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations. The National Aeronautics and Space Administration (NASA) D&NF Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns at or after launch due to underestimation of the complexity and supporting requirements for operations activities; the fifth mission had not launched at the time of the mission. The drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This paper updates the D

  2. Interim remedial measures proposed plan for the 200-ZP-1 Operable Unit, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Parker, D.L.

    1993-12-01

    The purpose of this interim remedial measures (IRM) proposed plan is to present and solicit public comments on the IRM planned for the 200-ZP-1 Operable Unit at the Hanford Site in Washington state. The 200-ZP-1 is one of two operable units that envelop the groundwater beneath the 200 West Area of the Hanford Site

  3. Operational Planning of Low-Energy District Heating Systems Connected to Existing Buildings

    DEFF Research Database (Denmark)

    Tol, Hakan; Svendsen, Svend

    2012-01-01

    . The response of the radiator heating systems at different levels of supply temperature was used to form the operational planning of the low-energy DH system, which determined the design parameters of the low-energy DH network in terms of overall mass flow requirement and the return temperature from...... the buildings. Since the existing buildings were considered to be renovated to low-energy class, the operational planning was simultaneously modelled for both present high-demand and future low-demand situations of the same case area.......This article focuses on low-energy District Heating (DH) systems operating in low-temperatures such as 55°C in terms of supply and 25°C in terms of return in connection with existing buildings. Since the heat loss from the network has a significant impact in case of supplying heat to low...

  4. Planning of operation & maintenance using risk and reliability based methods

    DEFF Research Database (Denmark)

    Florian, Mihai; Sørensen, John Dalsgaard

    2015-01-01

    Operation and maintenance (OM) of offshore wind turbines contributes with a substantial part of the total levelized cost of energy (LCOE). The objective of this paper is to present an application of risk- and reliability-based methods for planning of OM. The theoretical basis is presented...

  5. Continuity of operations planning in college athletic programs: The case for incorporating Federal Emergency Management Guidelines.

    Science.gov (United States)

    Hall, Stacey A; Allen, Brandon L; Phillips, Dennis

    2016-01-01

    College athletic departments have a responsibility to provide a safe environment for student-athletes; however, most colleges do not have a crisis management plan that includes procedures for displaced student-athletes or alternate facilities to perform athletic events. Continuity of operations planning ensures athletic programs are equipped to maintain essential functions during, or shortly after, a disruption of operations due to possible hazards. Previous studies have identified a lack of emergency preparedness and continuity planning in college athletic departments. The purpose of this article is to illustrate in detail one approach to disaster planning for college athletic departments, namely the Federal Emergency Management Agency (FEMA) continuity of operations framework. By adhering to FEMA guidelines and promoting a best practices model, athletic programs can effectively plan to address potential hazards, as well as protect the organization's brand, image, and financial sustainability after a crisis event.

  6. Operational environmental monitoring plan for the waste isolation pilot plant

    International Nuclear Information System (INIS)

    Mercer, D.D.; Baker, P.L.; Cockman, J.S.; Fischer, N.T.; Flynn, D.T.; Harvill, J.P.; Knudtsen, K.L.; Louderbough, E.T.

    1989-01-01

    This plan defines the scope and extent of the WIPP effluent and environmental monitoring programs during the facility's operational life. It also discusses the quality assurance/quality control programs which ensure that samples collected and the resulting analytical data are representative of actual conditions at the WIPP site. This plan provides a comprehensive description of environmental activities at WIPP, including: a summary of environmental program information, including an update of the status of environmental permits and compliance activities; a description of the WIPP project and its mission; a description of the local environment, including demographics; a summary of applicable standards and regulatory requirements and brief discussions of potential exposure pathways, routine and accidental releases, and their consequences; a summary of the preoperational environmental monitoring and assessment activities and responses to the requirements (Appendix A) and guidelines presented in the ''Radiological Effluent Monitoring and Environmental Surveillance for US DOE Operations.'' 166 refs., 28 figs., 27 tabs

  7. Autonomously Generating Operations Sequences for a Mars Rover Using Artificial Intelligence-Based Planning

    Science.gov (United States)

    Sherwood, R.; Mutz, D.; Estlin, T.; Chien, S.; Backes, P.; Norris, J.; Tran, D.; Cooper, B.; Rabideau, G.; Mishkin, A.; Maxwell, S.

    2001-07-01

    This article discusses a proof-of-concept prototype for ground-based automatic generation of validated rover command sequences from high-level science and engineering activities. This prototype is based on ASPEN, the Automated Scheduling and Planning Environment. This artificial intelligence (AI)-based planning and scheduling system will automatically generate a command sequence that will execute within resource constraints and satisfy flight rules. An automated planning and scheduling system encodes rover design knowledge and uses search and reasoning techniques to automatically generate low-level command sequences while respecting rover operability constraints, science and engineering preferences, environmental predictions, and also adhering to hard temporal constraints. This prototype planning system has been field-tested using the Rocky 7 rover at JPL and will be field-tested on more complex rovers to prove its effectiveness before transferring the technology to flight operations for an upcoming NASA mission. Enabling goal-driven commanding of planetary rovers greatly reduces the requirements for highly skilled rover engineering personnel. This in turn greatly reduces mission operations costs. In addition, goal-driven commanding permits a faster response to changes in rover state (e.g., faults) or science discoveries by removing the time-consuming manual sequence validation process, allowing rapid "what-if" analyses, and thus reducing overall cycle times.

  8. The Synthesis Method of Automated System of Operational Planning in Low-Space Communication System Messaging

    Directory of Open Access Journals (Sweden)

    Serhii Kovbasiuk

    2017-04-01

    Full Text Available One of the reasons for the decrease of efficiency in low-speed communication systems, satellite communication, which are based on nanoplatform is a high degree of operational planning centralisation. To overcome this problem the method which carries out the distribution of tasks of communications operational planning minimizing the exchange of information between spatially remote sites, and takes into account the computing performance of software and hardware was developed. The technique is based on the use of methods of structural and parametric synthesis, simulation and statistical analysis of the results. Its use allows to obtain the optimal structure of the automated system of operational planning in low-space communication system messaging evaluation of efficiency in terms of fixed communication of information load.

  9. Patient-specific instrumentation for total knee arthroplasty does not match the pre-operative plan as assessed by intra-operative computer-assisted navigation.

    Science.gov (United States)

    Scholes, Corey; Sahni, Varun; Lustig, Sebastien; Parker, David A; Coolican, Myles R J

    2014-03-01

    The introduction of patient-specific instruments (PSI) for guiding bone cuts could increase the incidence of malalignment in primary total knee arthroplasty. The purpose of this study was to assess the agreement between one type of patient-specific instrumentation (Zimmer PSI) and the pre-operative plan with respect to bone cuts and component alignment during TKR using imageless computer navigation. A consecutive series of 30 femoral and tibial guides were assessed in-theatre by the same surgeon using computer navigation. Following surgical exposure, the PSI cutting guides were placed on the joint surface and alignment assessed using the navigation tracker. The difference between in-theatre data and the pre-operative plan was recorded and analysed. The error between in-theatre measurements and pre-operative plan for the femoral and tibial components exceeded 3° for 3 and 17% of the sample, respectively, while the error for total coronal alignment exceeded 3° for 27% of the sample. The present results indicate that alignment with Zimmer PSI cutting blocks, assessed by imageless navigation, does not match the pre-operative plan in a proportion of cases. To prevent unnecessary increases in the incidence of malalignment in primary TKR, it is recommended that these devices should not be used without objective verification of alignment, either in real-time or with post-operative imaging. Further work is required to identify the source of discrepancies and validate these devices prior to routine use. II.

  10. Anticipation of lead time performance in supply chain operations planning

    NARCIS (Netherlands)

    Jansen, M.M.; Kok, de A.G.; Fransoo, J.C.

    2009-01-01

    Whilst being predominantly used in practice, linear and mixed integer programming models for Supply Chain Operations Planning (SCOP) are not well suited for modeling the relationship between the release of work to a production unit and its output over time. In this paper we propose an approach where

  11. Cassini Information Management System in Distributed Operations Collaboration and Cassini Science Planning

    Science.gov (United States)

    Equils, Douglas J.

    2008-01-01

    Launched on October 15, 1997, the Cassini-Huygens spacecraft began its ambitious journey to the Saturnian system with a complex suite of 12 scientific instruments, and another 6 instruments aboard the European Space Agencies Huygens Probe. Over the next 6 1/2 years, Cassini would continue its relatively simplistic cruise phase operations, flying past Venus, Earth, and Jupiter. However, following Saturn Orbit Insertion (SOI), Cassini would become involved in a complex series of tasks that required detailed resource management, distributed operations collaboration, and a data base for capturing science objectives. Collectively, these needs were met through a web-based software tool designed to help with the Cassini uplink process and ultimately used to generate more robust sequences for spacecraft operations. In 2001, in conjunction with the Southwest Research Institute (SwRI) and later Venustar Software and Engineering Inc., the Cassini Information Management System (CIMS) was released which enabled the Cassini spacecraft and science planning teams to perform complex information management and team collaboration between scientists and engineers in 17 countries. Originally tailored to help manage the science planning uplink process, CIMS has been actively evolving since its inception to meet the changing and growing needs of the Cassini uplink team and effectively reduce mission risk through a series of resource management validation algorithms. These algorithms have been implemented in the web-based software tool to identify potential sequence conflicts early in the science planning process. CIMS mitigates these sequence conflicts through identification of timing incongruities, pointing inconsistencies, flight rule violations, data volume issues, and by assisting in Deep Space Network (DSN) coverage analysis. In preparation for extended mission operations, CIMS has also evolved further to assist in the planning and coordination of the dual playback redundancy of

  12. Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review

    Science.gov (United States)

    Moyer, Eric

    2015-01-01

    The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.

  13. Reliability and risk-based planning of operation and maintenance of offshore wind turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard; Florian, Mihai; Berzonskis, Arvydas

    2016-01-01

    costly (and safe), and it is important to include in the reliability assessment the information obtained during operation (from condition monitoring and inspections) and the maintenance performed (incl. repairs and replacements). The paper presents a risk-based approach for optimal planning of Operation...

  14. Ra reactor operation plan for 1976 - Annex 6; Prilog 6 - Plan rada reaktora RA za 1976. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-01-15

    Contrary to previous years the RA reactor operation plan for 1976 is conditioned by more uncertainties than ever for the following reasons. It is planned for February to repair the components in order to eliminate the consequences of leaking from the vertical experimental channel VK-4 which happened in december 1975. Apart from this, measurements related to transfer of the core to highly enriched fuel under minimum power are foreseen to be performed in February. In April, it would be indispensable to locate the point of He gas leaking and its prevention. Core transfer to highly enriched fuel is planned for April for testing of the fuel elements under operating conditions and step by step increase of the power density up to the nominal power. Complete plan for core transfer would be available by the end of February 1976. It is planned to make-up for the mentioned delays from May-December 1976. [Serbo-Croat] Za razliku od prethodnih godina izrada plana rada reaktora RA za 1976. godinu vezana je za mnogo vise neizvesnosti nego ikada ranije iz sledecih razloga. U februaru se vrsi remont opreme i uklanjanja posledica procurivanja vertikalnog eksperimentalog kanala VK-4, koje se dogodilo decembra 1975. Sem toga u februaru se vrse merenja na minimalnim snagama u sklopu priprema za prelazak na novo gorivo. U aprilu ce biti neophodno lociranje mesta gde istice He gas kao i otklanjanje uzroka ovog curenja. Planirano je da se u aprilu ubaci novo gorivo u jezgro u cilju testiranja pod radnim uslovima uz postepeno povecanje snage do nominalne. Planirano je da se smanjeni obim rada usled navedenih uslova nadoknadi u potpunosti u periodu maj-decembar 1976.

  15. Weather integration in TMC operations : a self-evaluation and planning guide.

    Science.gov (United States)

    2009-04-01

    This flyer describes how Traffic Management Centers (TMC) can integrate weather information into their daily operations, and is based on the Road Weather Management Program publication, Self-Evaluation and Planning Guide (FHWA-JPO-08-057). The Guide ...

  16. COMPOEX Technology to Assist Leaders in Planning and Executing Campaigns in Complex Operational Environments

    National Research Council Canada - National Science Library

    Kott, Alexander; Corpac, Peter S

    2007-01-01

    ... in a complex operational environment. Leaders must understand the operational environment, develop campaign plans that include multiple lines of effort such as security, governance, political-economic development, rule of law and employ...

  17. Utilizing Strategic and Operational Methods for Whole-Community Disaster Planning.

    Science.gov (United States)

    Franks, Stevee; Seaton, Ellen

    2017-12-01

    Analysis of response and recovery efforts to disasters over the past 2 decades has identified a consistent gap that plagues the nation in regard to persons with access and functional needs. This gap can be highlighted by Hurricane Katrina, where the majority of those killed were a part of the access and functional needs population. After a disaster, many individuals with access and functional needs require assistance recovering but often have difficulty accessing services and resources. These difficulties are due to a combination of issues, such as health problems and the disruption of community support services. We sought to help bridge this gap by focusing on strategic and operational methods used while planning for the whole community. This article highlights the many partnerships that must be fostered for successful whole-community planning. These partnerships include, but are not limited to, local government departments, health agencies, nonprofit and nongovernmental organizations, and other volunteer organizations. We showcase these methods by using a developmental Post-Disaster Canvassing Plan to highlight planning methods that may aid jurisdictions across the United States in disaster planning for the whole community. (Disaster Med Public Health Preparedness. 2017;11:741-746).

  18. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

  19. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    International Nuclear Information System (INIS)

    1993-12-01

    RCRA ampersand Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP

  20. Bridging the accountability divide: male circumcision planning in Rwanda as a case study in how to merge divergent operational planning approaches.

    Science.gov (United States)

    McPherson, Dacia B; Balisanga, Helene N; Mbabazi, Jennifer K

    2014-10-01

    When voluntary medical male circumcision (MC) was confirmed as an effective tool for HIV prevention in sub-Saharan Africa in 2007, many public health policy makers and practitioners were eager to implement the intervention. How to roll out the tool as part of comprehensive strategy however was less clear. At the time, very little was known about the capacity of health systems to scale delivery of the new intervention. Today, nearly all countries prioritized for the intervention are far behind their targets. To contribute to the discourse on why this is, we develop a historical analysis of medical MC planning in sub-Saharan Africa using our own experience of this process in Rwanda. We compare our previously unpublished feasibility analysis from 2008 with international research published in 2009, which suggested how Rwanda could reduce HIV incidence through a rapid MC intervention, and Rwanda's eventual 2010 official operational plan. We trace how, in the face of uncertainty, operational plans avoided discussing the details of feasibility and focused instead on defining optimal circumcision capacity needed to achieve country level target reductions in HIV incidence. We show a distinct gap between the targets set in the official operational plan and what we determined was feasible in 2008. With actual data from the ground now available, we show our old feasibility models more closely approximate circumcision delivery rates to date. With an eye toward the future of long-term policy planning, we discuss the mechanics of how accountability gaps like this occur in global health policy making and how practitioners can better create achievable operational targets. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine © The Author 2013.

  1. Optimization and planning of operating theatre activities: an original definition of pathways and process modeling.

    Science.gov (United States)

    Barbagallo, Simone; Corradi, Luca; de Ville de Goyet, Jean; Iannucci, Marina; Porro, Ivan; Rosso, Nicola; Tanfani, Elena; Testi, Angela

    2015-05-17

    The Operating Room (OR) is a key resource of all major hospitals, but it also accounts for up 40% of resource costs. Improving cost effectiveness, while maintaining a quality of care, is a universal objective. These goals imply an optimization of planning and a scheduling of the activities involved. This is highly challenging due to the inherent variable and unpredictable nature of surgery. A Business Process Modeling Notation (BPMN 2.0) was used for the representation of the "OR Process" (being defined as the sequence of all of the elementary steps between "patient ready for surgery" to "patient operated upon") as a general pathway ("path"). The path was then both further standardized as much as possible and, at the same time, keeping all of the key-elements that would allow one to address or define the other steps of planning, and the inherent and wide variability in terms of patient specificity. The path was used to schedule OR activity, room-by-room, and day-by-day, feeding the process from a "waiting list database" and using a mathematical optimization model with the objective of ending up in an optimized planning. The OR process was defined with special attention paid to flows, timing and resource involvement. Standardization involved a dynamics operation and defined an expected operating time for each operation. The optimization model has been implemented and tested on real clinical data. The comparison of the results reported with the real data, shows that by using the optimization model, allows for the scheduling of about 30% more patients than in actual practice, as well as to better exploit the OR efficiency, increasing the average operating room utilization rate up to 20%. The optimization of OR activity planning is essential in order to manage the hospital's waiting list. Optimal planning is facilitated by defining the operation as a standard pathway where all variables are taken into account. By allowing a precise scheduling, it feeds the process of

  2. Lessons Learned for Planning and Estimating Operations Support Requirements

    Science.gov (United States)

    Newhouse, Marilyn

    2011-01-01

    Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.

  3. Spectral Graph Theory Analysis of Software-Defined Networks to Improve Performance and Security

    Science.gov (United States)

    2015-09-01

    too costly to continue operating and administrating them in the same basic manner as standardized by Advanced Research Projects Agency Network...to better monitor the network as compared to network perimeter defenses, such as firewalls and web server demilitarized zones (DMZs). The Open Network

  4. Pre-operative planning and intra-operative guidance in modern neurosurgery: a review of 300 cases.

    Science.gov (United States)

    Wadley, J.; Dorward, N.; Kitchen, N.; Thomas, D.

    1999-01-01

    Operative neurosurgery has recently entered an exciting era of image guided surgery or neuronavigation and application of this novel technology is beginning to have a significant impact in many ways in a variety of intracranial procedures. In order to fully assess the advantages of image guided techniques over conventional planning and surgery in selected cases, detailed prospective evaluation has been carried out during the advanced development of an optically tracked neuronavigation system. Over a 2-year period, 300 operative neurosurgical procedures have been performed with the assistance of interactive image guidance, as well as the development of new software applications and hardware tools. A broad range of intracranial neurosurgical procedures were seen to benefit from image guidance, including 163 craniotomies, 53 interactive stereotactic biopsies, 7 tracked neuroendoscopies and 37 complex skull base procedures. The most common pathological diagnoses were cerebral glioma in 98 cases, meningioma in 64 and metastasis in 23. Detailed analysis of a battery of postoperative questions revealed benefits in operative planning, appreciation of anatomy, lesion location, safety of surgery and greatly enhanced surgical confidence. The authors believe that image guided surgical technology, with new developments such as those described, has a significant role to play in contemporary neurosurgery and its widespread adoption in practice will be realised in the near future. Images Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figure 7 Figure 8 Figure 9 PMID:10615186

  5. Three-dimensional computed tomography reconstruction for operative planning in robotic segmentectomy: a pilot study.

    Science.gov (United States)

    Le Moal, Julien; Peillon, Christophe; Dacher, Jean-Nicolas; Baste, Jean-Marc

    2018-01-01

    The objective of our pilot study was to assess if three-dimensional (3D) reconstruction performed by Visible Patient™ could be helpful for the operative planning, efficiency and safety of robot-assisted segmentectomy. Between 2014 and 2015, 3D reconstructions were provided by the Visible Patient™ online service and used for the operative planning of robotic segmentectomy. To obtain 3D reconstruction, the surgeon uploaded the anonymized computed tomography (CT) image of the patient to the secured Visible Patient™ server and then downloaded the model after completion. Nine segmentectomies were performed between 2014 and 2015 using a pre-operative 3D model. All 3D reconstructions met our expectations: anatomical accuracy (bronchi, arteries, veins, tumor, and the thoracic wall with intercostal spaces), accurate delimitation of each segment in the lobe of interest, margin resection, free space rotation, portability (smartphone, tablet) and time saving technique. We have shown that operative planning by 3D CT using Visible Patient™ reconstruction is useful in our practice of robot-assisted segmentectomy. The main disadvantage is the high cost. Its impact on reducing complications and improving surgical efficiency is the object of an ongoing study.

  6. Dynamic Supply Chain Design and Operations Plan for Connected Smart Factories with Additive Manufacturing

    Directory of Open Access Journals (Sweden)

    Byung Do Chung

    2018-04-01

    Full Text Available Interest in smart factories and smart supply chains has been increasing, and researchers have emphasized the importance and the effects of advanced technologies such as 3D printers, the Internet of Things, and cloud services. This paper considers an innovation in dynamic supply-chain design and operations: connected smart factories that share interchangeable processes through a cloud-based system for personalized production. In the system, customers are able to upload a product design file, an optimal supply chain design and operations plan are then determined based on the available resources in the network of smart factories. The concept of smart supply chains is discussed and six types of flexibilities are identified, namely: design flexibility, product flexibility, process flexibility, supply chain flexibility, collaboration flexibility, and strategic flexibility. Focusing on supply chain flexibility, a general planning framework and various optimization models for dynamic supply chain design and operations plan are proposed. Further, numerical experiments are conducted to analyze fixed, production, and transportation costs for various scenarios. The results demonstrate the extent of the dynamic supply chain design and operations problem, and the large variation in transportation cost.

  7. The Operation “Big Saturn”: Plan and Implementation Opportunities

    Directory of Open Access Journals (Sweden)

    Ochirov Utash Borisovich

    2015-11-01

    Full Text Available The article analyzes the plan of one of the most important operations of a radical turning point in the course of the Great Patriotic War. Initially, the plan, conceived as the development of Operation “Uranus” and resulted in the encirclement of the 6th Army headed by Field Marshall Paulus at Stalingrad, was called “Saturn”. However, after creating a shortened version of the name “Small Saturn”, it was called “Big Saturn”. The main purpose of “Saturn” was to conduct the strategic offensive with the help of four or five armies from middle Don and Chir towards Rostov-on-Don to withdraw the enemy Army Group “Don” and Army Group “A” from the Caucasus. The enemy army groups consisted of almost a third of the units of the Wehrmacht and its allies, who fought against the Soviet Union and their defeat or delay on the Taman Peninsula where there was no port capacity for rapid evacuation of such a large group of people, equipment and supplies, could significantly change the balance of forces on the Eastern front. Unfortunately, the Сhief of the General Staff of the Red Army Alexander Vasilevsky, who was initially in charge of the “Saturn” operation as the representative of Stavka (General Headquarters, was appointed by Stalin in late November as a coordinator of the Soviet troops, achieving the encirclement of the surrounded Paulus’s grouping. Vasilevsky, using his authority, managed to transfer a significant part of the strategic reserves from the middle Don direction firstly to the Stalingrad direction and then to the Kotelnikovsky direction against unlocking grouping of Manstein. The analysis of the forces of the Stalingrad Front, given in the article, shows that there were enough troops to repulse an attack. The transferred strategic reserves proved to be redundant, and their offensive on Rostov failed, while their usage according to the plan “Saturn” would have led to undeniable success. As a result, Manstein

  8. Risk Assessment Using The Homeland-Defense Operational Planning System (HOPS)

    International Nuclear Information System (INIS)

    Price, D E; Durling, R L

    2005-01-01

    The Homeland-Defense Operational Planning System (HOPS), is a new operational planning tool leveraging Lawrence Livermore National Laboratory's expertise in weapons systems and in sparse information analysis to support the defense of the U.S. homeland. HOPS provides planners with a basis to make decisions to protect against acts of terrorism, focusing on the defense of facilities critical to U.S. infrastructure. Criticality of facilities, structures, and systems is evaluated on a composite matrix of specific projected casualty, economic, and sociopolitical impact bins. Based on these criteria, significant unidentified vulnerabilities are identified and secured. To provide insight into potential successes by malevolent actors, HOPS analysts strive to base their efforts mainly on unclassified open-source data. However, more cooperation is needed between HOPS analysts and facility representatives to provide an advantage to those whose task is to defend these facilities. Evaluated facilities include: refineries, major ports, nuclear power plants and other nuclear licensees, dams, government installations, convention centers, sports stadiums, tourist venues, and public and freight transportation systems. A generalized summary of analyses of U.S. infrastructure facilities will be presented

  9. Proposed energy conservation contingency plan: emergency restrictions on advertising lighting. Authorities, need, rationale, and operation

    Energy Technology Data Exchange (ETDEWEB)

    1977-04-01

    The emergency restrictions on advertising lighting proposed in Energy Conservation Contingency Plan No. 5 of 1977 are presented. A statement is given on the need for rationale and operation of the Contingency Plan.

  10. Using operations research to plan the british columbia registered nurses' workforce.

    Science.gov (United States)

    Lavieri, Mariel S; Regan, Sandra; Puterman, Martin L; Ratner, Pamela A

    2008-11-01

    The authors explore the power and flexibility of using an operations research methodology known as linear programming to support health human resources (HHR) planning. The model takes as input estimates of the future need for healthcare providers and, in contrast to simulation, compares all feasible strategies to identify a long-term plan for achieving a balance between supply and demand at the least cost to the system. The approach is illustrated by using it to plan the British Columbia registered nurse (RN) workforce over a 20-year horizon. The authors show how the model can be used for scenario analysis by investigating the impact of decreasing attrition from educational programs, changing RN-to-manager ratios in direct care and exploring how other changes might alter planning recommendations. In addition to HHR policy recommendations, their analysis also points to new research opportunities. Copyright © 2008 Longwoods Publishing.

  11. It's Indisputable: Five Facts About Planning and Operating Modern Power Systems

    Energy Technology Data Exchange (ETDEWEB)

    Bloom, Aaron; Helman, Udi; Holttinen, Hannele; Summers, Kate; Bakke, Jordan; Brinkman, Gregory; Lopez, Anthony

    2017-11-01

    An indisputable fact cannot be rebutted. It is supported by theory and experience. Over the past 25 years, wind and solar generation has undergone dramatic growth, resulting in a variety of experiences that model the integration of wind and solar into the planning and operation of modern electric power systems. In this article, we bring together examples from Europe, North America, and Australia to identify five indisputable facts about planning and operating modern power systems. Taken together, we hope these experiences can help build consensus among the engineering and public policy communities about the current state of wind and solar integration and also facilitate conversations about evolving future challenges.

  12. 1997 annual ground control operating plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1997-02-01

    This plan presents background information and a working guide to assist Mine Operations and Engineering in developing strategies for addressing ground control issues at the Waste Isolation Pilot Plant (WIPP). With the anticipated receipt of waste in late 1997, this document provides additional detail to Panel 1 activities and options. The plan also serves as a foundation document for development and revision of the annual long-term ground control plan. Section 2.0 documents the current status of all underground excavations with respect to location, geology, geometry, age, ground support, operational use, projected life, and physical conditions. Section 3.0 presents the methods used to evaluate ground conditions, including visual observations of the roof, ribs, and floor, inspection of observation holes, and review of instrumentation data. Section 4.0 lists several ground support options and specific applications of each. Section 5.0 discusses remedial ground control measures that have been implemented to date. Section 6.0 presents projections and recommendations for ground control actions based on the information in Sections 2.0 through 5.0 of this plan and on a rating of the critical nature of each specific area. Section 7.0 presents a summary statement, and Section 8.0 includes references. Appendix A provides an overview and critique of ground control systems that have been, or may be, used at the site. Because of the dynamic nature of the underground openings and associated geotechnical activities, this plan will be revised as additional data are incorporated

  13. Vulnerability And Risk Assessment Using The Homeland-Defense Operational Planning System (HOPS)

    International Nuclear Information System (INIS)

    Durling, R.L. Jr.; Price, D.E.; Spero, K.K.

    2005-01-01

    For over ten years, the Counterproliferation Analysis and Planning System (CAPS) at Lawrence Livermore National Laboratory (LLNL) has been a planning tool used by U.S. combatant commands for mission support planning against foreign programs engaged in the manufacture of weapons of mass destruction (WMD). CAPS is endorsed by the Secretary of Defense as the preferred counterproliferation tool to be used by the nation's armed services. A sister system, the Homeland-Defense Operational Planning System (HOPS), is a new operational planning tool leveraging CAPS expertise designed to support the defense of the U.S. homeland. HOPS provides planners with a basis to make decisions to protect against acts of terrorism, focusing on the defense of facilities critical to U.S. infrastructure. Criticality of facilities, structures, and systems is evaluated on a composite matrix of specific projected casualty, economic, and sociopolitical impact bins. Based on these criteria, significant unidentified vulnerabilities are identified and secured. To provide insight into potential successes by malevolent actors, HOPS analysts strive to base their efforts mainly on unclassified open-source data. However, more cooperation is needed between HOPS analysts and facility representatives to provide an advantage to those whose task is to defend these facilities. Evaluated facilities include: refineries, major ports, nuclear power plants and other nuclear licensees, dams, government installations, convention centers, sports stadiums, tourist venues, and public and freight transportation systems. A generalized summary of analyses of U.S. infrastructure facilities is presented

  14. Operational radioactive waste management plan for the Nevada Test Site

    International Nuclear Information System (INIS)

    1980-11-01

    The Operational Radioactive Waste Management Plan for the Nevada Test Site establishes procedures and methods for the safe shipping, receiving, processing, disposal, and storage of radioactive waste. Included are NTS radioactive waste disposition program guidelines, procedures for radioactive waste management, a description of storage and disposal areas and facilities, and a glossary of specifications and requirements

  15. The experiences from implementing decision support technology to address water management plans in an operational environment

    Energy Technology Data Exchange (ETDEWEB)

    McArdle, S. [4DM Inc., Toronto, ON (Canada); Tonkin, C. [Ontario Power Generation Inc., Toronto, ON (Canada)

    2005-07-01

    This presentation described Ontario Power Generation's experience in implementing a decision support tool to enable water management plans for its operations through technology solutions. All hydroelectric producers in Ontario are required to make water management plans in order to maintain water levels and flows in their operating regions. This regulation was created in response to environmental concerns as well as to changes in the electricity market and growth of residential and cottage property near water bodies. In order to keep informed and to address compliance issues, operators and managers need situation awareness information to balance operational decisions. The online Adaptive Water Management System (AWMS) decision support tool was recently adopted by Ontario Power Generation to provide information needed to address the requirements of Water Management Plans. The AWMS provides users with information on water levels and flows; the ability to implement, modify, and manage daily instructions at the facilities; track conditions in the watershed; and, provide a status of compliance. The tool was developed by 4DM Inc. in collaboration with Ottawa St. Lawrence Plant Group for the Madawaska River Watershed Management, a model partnership between operator, regulator and Public Advisory Committee to develop a water management plan.

  16. A test case of computer aided motion planning for nuclear maintenance operation

    International Nuclear Information System (INIS)

    Schmitzberger, E.; Bouchet, J.L.; Schmitzberger, E.

    2001-01-01

    Needs for improved tools for nuclear power plant maintenance preparation are expressed by EDF engineering. These are an easier and better management of logistics constraints such as free spaces for motions or handling tasks. The lack of generic or well suited tools and the specificity of nuclear maintenance operation have led EDF R and D to develop its own motion planning tools in collaboration with LAAS-CNRS, Utrecht University and the software publisher CADCENTRE within the framework of the three years Esprit LTR project MOLOG. EDF users needs will be summed up in the first part of the paper under the title ''Motion feasibility studies for maintenance operation'' and then compared to the current industrial offer in the ''Software's background'''s part. The definition and objectives ''Towards motion planning tools'' follows. It explains why maintenance preparation pertains to automatic motion planning and how it makes studies much simpler. The ''MOLOG's Benchmark and first result'''s part describes the test-case used to evaluate the MOLOG project and gives an outlook at the results obtained so far. (author)

  17. Condition-based dynamic maintenance operations planning and grouping. Application to commercial heavy vehicles

    Energy Technology Data Exchange (ETDEWEB)

    Bouvard, K., E-mail: keomany.bouvard@volvo.co [Volvo Technology, 99 route de Lyon, 69806 Saint Priest cedex (France); Laboratoire d' Automatique de Genie Informatique et Signal - FRE3303 - Polytech' Lille, 59655 Villeneuve d' Ascq (France); Artus, S., E-mail: samuel.artus@volvo.co [Volvo Technology, 99 route de Lyon, 69806 Saint Priest cedex (France); Berenguer, C., E-mail: christophe.berenguer@utt.f [Universite de technologie de Troyes - Institut Charles Delaunay and UMR CNRS 6279 - 12, rue Marie Curie, BP2060, 10010 Troyes cedex (France); Cocquempot, V., E-mail: vincent.cocquempot@univ-lille1.f [Laboratoire d' Automatique de Genie Informatique et Signal - FRE3303 - Polytech' Lille, 59655 Villeneuve d' Ascq (France)

    2011-06-15

    This paper aims at presenting a method to optimize the maintenance planning for a commercial heavy vehicle. Such a vehicle may be considered as a multi-components system. Grouping maintenance operations related to each component reduces the global maintenance cost of the system. Classically, the optimization problem is solved using a priori reliability characteristics of components. Two types of methods may be used, i.e. static or dynamic methods. Static methods provide a fixed maintenance planning, whereas dynamic methods redefine the groups of maintenance operations at each decision time. Dynamic procedures can incorporate component information such as component states or detected failures. For deteriorating systems, reliability characteristics of each component may be estimated thanks to deterioration models and may be updated when a degradation measure is available. This additional information on degradation features allows to better follow the real state of each component and to improve the maintenance planning.

  18. 20 Years of Dukovany NPP Operation and Plans for Future

    International Nuclear Information System (INIS)

    Vlcek, J.

    2006-01-01

    NPP Dukovany (4x440MW), the first Czech nuclear power plant and a keystone of Czech Electricity Grid, in 2005 celebrated 20 years of successful operation. In my presentation I am going to speak about next areas. I will start about construction and commissioning history of Dukovany NPP, then I'll put forward what milestones of Dukovany NPP operation were accomplished, I'll say examples about our modernisation and investment activities (including replacement of IandC equipment, modifications for increasing of power and support grid services) and in the end our plans for future. (author)

  19. Operable Unit 3-13, Group 3, Other Surface Soils (Phase II) Field Sampling Plan

    Energy Technology Data Exchange (ETDEWEB)

    G. L. Schwendiman

    2006-07-27

    This Field Sampling Plan describes the Operable Unit 3-13, Group 3, Other Surface Soils, Phase II remediation field sampling activities to be performed at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Sampling activities described in this plan support characterization sampling of new sites, real-time soil spectroscopy during excavation, and confirmation sampling that verifies that the remedial action objectives and remediation goals presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13 have been met.

  20. Automated transit planning, operation, and applications

    CERN Document Server

    Liu, Rongfang

    2016-01-01

    This book analyzes the successful implementations of automated transit in various international locations, such as Paris, Toronto, London, and Kuala Lumpur, and investigates the apparent lack of automated transit applications in the urban environment in the United States. The book begins with a brief definition of automated transit and its historical development. After a thorough description of the technical specifications, the author highlights a few applications from each sub-group of the automated transit spectrum. International case studies display various technologies and their applications, and identify vital factors that affect each system and performance evaluations of existing applications. The book then discusses the planning and operation of automated transit applications at both macro and micro levels. Finally, the book covers a number of less successful concepts, as well as the lessons learned, allow ng readers to gain a comprehensive understanding of the topic.

  1. A sensor management architecture concept for monitoring emissions from open-air demil operations.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Michael M.; Robinson, Jerry D.; Stoddard, Mary Clare; Horn, Brent A.; Lipkin, Joel; Foltz, Greg W.

    2005-09-01

    Sandia National Laboratories, CA proposed a sensor concept to detect emissions from open-burning/open-detonation (OB/OD) events. The system would serve two purposes: (1) Provide data to demilitarization operations about process efficiency, allowing process optimization for cleaner emissions and higher efficiency. (2) Provide data to regulators and neighboring communities about materials dispersing into the environment by OB/OD operations. The proposed sensor system uses instrument control hardware and data visualization software developed at Sandia National Laboratories to link together an array of sensors to monitor emissions from OB/OD events. The suite of sensors would consist of various physical and chemical detectors mounted on stationary or mobile platforms. The individual sensors would be wirelessly linked to one another and controlled through a central command center. Real-time data collection from the sensors, combined with integrated visualization of the data at the command center, would allow for feedback to the sensors to alter operational conditions to adjust for changing needs (i.e., moving plume position, increased spatial resolution, increased sensitivity). This report presents a systems study of the problem of implementing a sensor system for monitoring OB/OD emissions. The goal of this study was to gain a fuller understanding of the political, economic, and technical issues for developing and fielding this technology.

  2. A scientific operations plan for the large space telescope. [ground support system design

    Science.gov (United States)

    West, D. K.

    1977-01-01

    The paper describes an LST ground system which is compatible with the operational requirements of the LST. The goal of the approach is to minimize the cost of post launch operations without seriously compromising the quality and total throughput of LST science. Attention is given to cost constraints and guidelines, the telemetry operations processing systems (TELOPS), the image processing facility, ground system planning and data flow, and scientific interfaces.

  3. Approach to Issues in Planning and Operation of Railway BOT Projects

    Institute of Scientific and Technical Information of China (English)

    Zhao Xianghong; Chen Min

    2009-01-01

    As an internationally popular mode of public infrastructures' investment,construction and operation,BOT (build-operate-transfer) has been successfully applied in some countries and regions of the world for their infrastructures' construction and playing an important role in promoting the construction of public infrastructures.The Ministry of Railways clearly proposed in its Suggestions for Implementation of Encouraging,Supporting and Guiding Participation of Non-public-owned Economy in Railway Construction and Operation that it was necessary to study and take for reference multiple modes of public infrastructures'investment,construction and operation including BOT.It is more complicated and risky for the process of planning and operation of BOT projects.The paper takes for reference the domestic and foreign experiences in the operation of BOT projects,analyzes the issues that will arise such as risk control in implementing railway BOT projects,employment of professional consultants,financing coordination,tariff making,non-commercial subsidy,as well as operation and management,and puts forward corresponding suggestions for these issues.

  4. A manned maneuvering unit proximity operations planning and flight guidance display and control system

    Science.gov (United States)

    Gershzohn, Gary R.; Sirko, Robert J.; Zimmerman, K.; Jones, A. D.

    1990-01-01

    This task concerns the design, development, testing, and evaluation of a new proximity operations planning and flight guidance display and control system for manned space operations. A forecast, derivative manned maneuvering unit (MMU) was identified as a candidate for the application of a color, highway-in-the-sky display format for the presentation of flight guidance information. A silicon graphics 4D/20-based simulation is being developed to design and test display formats and operations concepts. The simulation includes the following: (1) real-time color graphics generation to provide realistic, dynamic flight guidance displays and control characteristics; (2) real-time graphics generation of spacecraft trajectories; (3) MMU flight dynamics and control characteristics; (4) control algorithms for rotational and translational hand controllers; (5) orbital mechanics effects for rendezvous and chase spacecraft; (6) inclusion of appropriate navigation aids; and (7) measurement of subject performance. The flight planning system under development provides for: (1) selection of appropriate operational modes, including minimum cost, optimum cost, minimum time, and specified ETA; (2) automatic calculation of rendezvous trajectories, en route times, and fuel requirements; (3) and provisions for manual override. Man/machine function allocations in planning and en route flight segments are being evaluated. Planning and en route data are presented on one screen composed of two windows: (1) a map display presenting a view perpendicular to the orbital plane, depicting flight planning trajectory and time data attitude display presenting attitude and course data for use en route; and (2) an attitude display presenting local vertical-local horizontal attitude data superimposed on a highway-in-the-sky or flight channel representation of the flight planned course. Both display formats are presented while the MMU is en route. In addition to these displays, several original display

  5. Operational report, Formation of the XXVII reactor core, plan of fuel exchange

    International Nuclear Information System (INIS)

    Martinc, R.

    1977-01-01

    Plan for fuel exchange for formation of the reactor core No. XXVII is presented. This report includes: the quantity of 80% enriched fuel which is input in the core, description of the fuel 'transfer' through the core within this fuelling scheme. It covers the review of reactor safety operating with the core No. XXVII related to reactivity change, thermal load of the fuel channels and fuel burnup. These data result from the analysis based on the same correlated calculation method which was applied for planning the first regular fuel exchange with 80% enriched fuel (core No. XXVI configuration), which has been approved in february 1977. Based on the enclosed data and the fuel exchange according to the proposed procedure it is expected that the reactor operation with core No. XXVII configuration will be safe [sr

  6. Planning and operating energy efficient factories; Energieeffiziente Fabriken planen und betreiben

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Egon; Strauch, Joerg [Technische Univ. Chemnitz (Germany). Professur fuer Fabrikplanung und Fabrikbetrieb; Engelmann, Joerg [Volkswagen Sachsen GmbH, Zwickau (Germany). Werktechnik / Umweltplanung; Loeffler, Thomas [Technische Univ. Chemnitz (Germany). Professur fuer Fabrikplanung und Fabrikbetrieb; IREGIA e.V., Chemnitz (Germany)

    2009-07-01

    This book presents systematic approaches to developing energy saving potentials in the planning and operation of factories. The authors describe the drivers of the current energy debate and the state of the art in making factories energy efficient. They explain important principles that must be observed in considering factories as a system and in order to understand questions relating to energy. They have developed methods for finding appropriate energy-efficient solutions in factory planning. Detailed explanations are given on energy-relevant installations which require planning such as drives, compressed air systems or ventilation systems. The book presents methods and instruments for the analysis and evaluation of energy consumption which can be used for assessment purposes during the initial planning as well as for monitoring and influencing energy consumption during normal operation. Selected practical examples, notably from the automotive industry, serve to illustrate the material presented. The book is intended primarily for planning and production engineers in the piece goods industry as well as for students in related fields. [German] Das Buch zeigt auf, wie beim Planen und Betreiben von Fabriken systematisch Potenziale fuer Energieeinsparungen erschlossen werden koennen. Die Autoren beschreiben die Treiber der aktuellen Energiedebatte und den Status Quo der ''Energieeffizienten Fabrik''. Sie erlaeutern wichtige Grundlagen, um die Fabrik als System und energetische Zusammenhaenge zu verstehen. Eine von ihnen entwickelte Methodik hilft, bereits bei der Planung von Fabriken adaequate energieeffiziente Loesungen zu finden. Energierelevante Planungsobjekte wie elektrische Antriebe, Druckluft- oder Lueftungssysteme werden naeher erlaeutert. Fuer die Analyse und Bewertung des Energieverbrauchs werden Methoden und Instrumente vorgestellt, mit denen sowohl die Ausgangsituation bei der Planung beurteilt als auch der Energieverbrauch im

  7. Coordinating space telescope operations in an integrated planning and scheduling architecture

    Science.gov (United States)

    Muscettola, Nicola; Smith, Stephen F.; Cesta, Amedeo; D'Aloisi, Daniela

    1992-01-01

    The Heuristic Scheduling Testbed System (HSTS), a software architecture for integrated planning and scheduling, is discussed. The architecture has been applied to the problem of generating observation schedules for the Hubble Space Telescope. This problem is representative of the class of problems that can be addressed: their complexity lies in the interaction of resource allocation and auxiliary task expansion. The architecture deals with this interaction by viewing planning and scheduling as two complementary aspects of the more general process of constructing behaviors of a dynamical system. The principal components of the software architecture are described, indicating how to model the structure and dynamics of a system, how to represent schedules at multiple levels of abstraction in the temporal database, and how the problem solving machinery operates. A scheduler for the detailed management of Hubble Space Telescope operations that has been developed within HSTS is described. Experimental performance results are given that indicate the utility and practicality of the approach.

  8. WFIRST: STScI Science Operations Center (SSOC) Activities and Plans

    Science.gov (United States)

    Gilbert, Karoline M.; STScI WFIRST Team

    2018-01-01

    The science operations for the WFIRST Mission will be distributed between Goddard Space Flight Center, the Space Telescope Science Institute (STScI), and the Infrared Processing and Analysis Center (IPAC). The STScI Science Operations Center (SSOC) will schedule and archive all WFIRST observations, will calibrate and produce pipeline-reduced data products for the Wide Field Instrument, and will support the astronomical community in planning WFI observations and analyzing WFI data. During the formulation phase, WFIRST team members at STScI have developed operations concepts for scheduling, data management, and the archive; have performed technical studies investigating the impact of WFIRST design choices on data quality and analysis; and have built simulation tools to aid the community in exploring WFIRST’s capabilities. We will highlight examples of each of these efforts.

  9. Phased project planning and development in anticipation of operational programs

    Science.gov (United States)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  10. Heat pumps: planning, optimisation, operation and maintenance; Waermepumpen. Planung - Optimierung - Betrieb - Wartung

    Energy Technology Data Exchange (ETDEWEB)

    Kunz, P. [Kunz-Beratungen, Dietlikon (Switzerland); Afjei, T. [Fachhochschule Nordwestschweiz, Institut fuer Energie am Bau, Muttenz (Switzerland); Betschart, W.; Prochaska, V. [Hochschule Luzern, Technik und Architektur, Horw (Switzerland); Hubacher, P. [Hubacher Engineering, Engelburg (Switzerland); Loehrer, R. [Scheco AG, Winterthur (Switzerland); Mueller, A. [Mueller und Pletscher AG, Winterthur (Switzerland)

    2008-01-15

    This handbook issued by the Swiss Federal Office of Energy (SFOE) in co-operation with a trade publication takes a look at the planning, optimisation, operation and maintenance of heat pumps. First of all, the basics of heat pump technology, heat pump components and refrigerants are discussed. Then, heat sources and heat distribution are looked at, followed by chapters on the integration of heat pumps into heating systems and noise protection topics. The definition of projects, commissioning and operation of heat pump systems are then discussed. Examples of installations round off the handbook.

  11. Cautious but Committed: Moving Toward Adaptive Planning and Operation Strategies for Renewable Energy's Wildlife Implications

    Science.gov (United States)

    Köppel, Johann; Dahmen, Marie; Helfrich, Jennifer; Schuster, Eva; Bulling, Lea

    2014-10-01

    Wildlife planning for renewable energy must cope with the uncertainties of potential wildlife impacts. Unfortunately, the environmental policies which instigate renewable energy and those which protect wildlife are not coherently aligned—creating a green versus green dilemma. Thus, climate mitigation efforts trigger renewable energy development, but then face substantial barriers from biodiversity protection instruments and practices. This article briefly reviews wind energy and wildlife interactions, highlighting the lively debated effects on bats. Today, planning and siting of renewable energy are guided by the precautionary principle in an attempt to carefully address wildlife challenges. However, this planning attitude creates limitations as it struggles to negotiate the aforementioned green versus green dilemma. More adaptive planning and management strategies and practices hold the potential to reconcile these discrepancies to some degree. This adaptive approach is discussed using facets of case studies from policy, planning, siting, and operational stages of wind energy in Germany and the United States, with one case showing adaptive planning in action for solar energy as well. This article attempts to highlight the benefits of more adaptive approaches as well as the possible shortcomings, such as reduced planning security for renewable energy developers. In conclusion, these studies show that adaptive planning and operation strategies can be designed to supplement and enhance the precautionary principle in wildlife planning for green energy.

  12. Cautious but committed: moving toward adaptive planning and operation strategies for renewable energy's wildlife implications.

    Science.gov (United States)

    Köppel, Johann; Dahmen, Marie; Helfrich, Jennifer; Schuster, Eva; Bulling, Lea

    2014-10-01

    Wildlife planning for renewable energy must cope with the uncertainties of potential wildlife impacts. Unfortunately, the environmental policies which instigate renewable energy and those which protect wildlife are not coherently aligned-creating a green versus green dilemma. Thus, climate mitigation efforts trigger renewable energy development, but then face substantial barriers from biodiversity protection instruments and practices. This article briefly reviews wind energy and wildlife interactions, highlighting the lively debated effects on bats. Today, planning and siting of renewable energy are guided by the precautionary principle in an attempt to carefully address wildlife challenges. However, this planning attitude creates limitations as it struggles to negotiate the aforementioned green versus green dilemma. More adaptive planning and management strategies and practices hold the potential to reconcile these discrepancies to some degree. This adaptive approach is discussed using facets of case studies from policy, planning, siting, and operational stages of wind energy in Germany and the United States, with one case showing adaptive planning in action for solar energy as well. This article attempts to highlight the benefits of more adaptive approaches as well as the possible shortcomings, such as reduced planning security for renewable energy developers. In conclusion, these studies show that adaptive planning and operation strategies can be designed to supplement and enhance the precautionary principle in wildlife planning for green energy.

  13. Comparing Pre- and Post-Operative Fontan Hemodynamic Simulations: Implications for the Reliability of Surgical Planning

    Science.gov (United States)

    Haggerty, Christopher M.; de Zélicourt, Diane A.; Restrepo, Maria; Rossignac, Jarek; Spray, Thomas L.; Kanter, Kirk R.; Fogel, Mark A.; Yoganathan, Ajit P.

    2012-01-01

    Background Virtual modeling of cardiothoracic surgery is a new paradigm that allows for systematic exploration of various operative strategies and uses engineering principles to predict the optimal patient-specific plan. This study investigates the predictive accuracy of such methods for the surgical palliation of single ventricle heart defects. Methods Computational fluid dynamics (CFD)-based surgical planning was used to model the Fontan procedure for four patients prior to surgery. The objective for each was to identify the operative strategy that best distributed hepatic blood flow to the pulmonary arteries. Post-operative magnetic resonance data were acquired to compare (via CFD) the post-operative hemodynamics with predictions. Results Despite variations in physiologic boundary conditions (e.g., cardiac output, venous flows) and the exact geometry of the surgical baffle, sufficient agreement was observed with respect to hepatic flow distribution (90% confidence interval-14 ± 4.3% difference). There was also good agreement of flow-normalized energetic efficiency predictions (19 ± 4.8% error). Conclusions The hemodynamic outcomes of prospective patient-specific surgical planning of the Fontan procedure are described for the first time with good quantitative comparisons between preoperatively predicted and postoperative simulations. These results demonstrate that surgical planning can be a useful tool for single ventricle cardiothoracic surgery with the ability to deliver significant clinical impact. PMID:22777126

  14. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    International Nuclear Information System (INIS)

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE's preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public's role in helping DOE and the EPA to make the final decision on a remedy

  15. Integrated payload and mission planning, phase 3. Volume 3: Ground real-time mission operations

    Science.gov (United States)

    White, W. J.

    1977-01-01

    The payloads tentatively planned to fly on the first two Spacelab missions were analyzed to examine the cost relationships of providing mission operations support from onboard vs the ground-based Payload Operations Control Center (POCC). The quantitative results indicate that use of a POCC, with data processing capability, to support real-time mission operations is the most cost effective case.

  16. KSC facilities status and planned management operations. [for Shuttle launches

    Science.gov (United States)

    Gray, R. H.; Omalley, T. J.

    1979-01-01

    A status report is presented on facilities and planned operations at the Kennedy Space Center with reference to Space Shuttle launch activities. The facilities are essentially complete, with all new construction and modifications to existing buildings almost finished. Some activity is still in progress at Pad A and on the Mobile Launcher due to changes in requirements but is not expected to affect the launch schedule. The installation and testing of the ground checkout equipment that will be used to test the flight hardware is now in operation. The Launch Processing System is currently supporting the development of the applications software that will perform the testing of this flight hardware.

  17. Employing Multiple Unmanned Aerial Vehicles for Co-Operative Path Planning

    Directory of Open Access Journals (Sweden)

    Durdana Habib

    2013-05-01

    Full Text Available Abstract In this paper, we work to develop a path planning solution for a group of Unmanned Aerial Vehicles (UAVs using a Mixed Integer Linear Programming (MILP approach. Co-operation among team members not only helps reduce mission time, it makes the execution more robust in dynamic environments. However, the problem becomes more challenging as it requires optimal resource allocation and is NP-hard. Since UAVs may be lost or may suffer significant damage during the course of the mission, plans may need to be modified in real-time as the mission proceeds. Therefore, multiple UAVs have a better chance of completing a mission in the face of failures. Such military operations can be treated as a variant of the Multiple Depot Vehicle Routing Problem (MDVRP. The proposed solution must be such that m UAVs start from multiple source locations to visit n targets and return to a set of destination locations such that (1 each target is visited exactly by one of the chosen UAVs (2 the total distance travelled by the group is minimized and (3 the number of targets that each UAV visits may not be less than K or greater than L.

  18. Operational Readiness Review Implementation Plan for the K Basin Fuel Transfer System

    International Nuclear Information System (INIS)

    DAVIES, T.H.

    2002-01-01

    This implementation plan has been prepared to comply with the requirements of U.S. Department of Energy (DOE) Order 425.1A, Startup and Restart of Nuclear Facilities, and DOE-STD-3006-2000, Planning and Conduct of Operational Readiness Reviews (ORR) (DOE 2002). The scope of the ORR is described in the contractor K Basin Fuel Transfer System (FTS) Plan of Action (POA), which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on April 4, 2002 (FH 2002a). While the Project Hanford Management Contractor has been revised to include DOE Order 425.1B, the contractor implementing procedure, ''F-PRO-055, Startup Readiness (Revision 9) has not yet been approved by RL for contractor use. Appendix A provides a crosswalk between the requirements of DOE Order 425.1A and DOE Order 425.1B to show that all requirements of DOE 425.1B are covered by this implementation plan. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated November 20, 2001 (Roberson 2001). The scope of the ORR is described in the RL Plan of Action, K Basin Fuel Transfer System, prepared by DOE project line management and approved by the RL Manager, the designated approval authority, on September 12, 2002 (Schlender 2002). This implementation plan provides the overall approach and guidelines for performance of the DOE ORR. Appendix B contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  19. A test case of computer aided motion planning for nuclear maintenance operation

    Energy Technology Data Exchange (ETDEWEB)

    Schmitzberger, E.; Bouchet, J.L. [Electricite de France (EDF), Dept. Surveillance Diagnostic Maintenance, 78 - Chatou (France); Schmitzberger, E. [Institut National Polytechnique, CRAN, 54 - Vandoeuvre les Nancy (France)

    2001-07-01

    Needs for improved tools for nuclear power plant maintenance preparation are expressed by EDF engineering. These are an easier and better management of logistics constraints such as free spaces for motions or handling tasks. The lack of generic or well suited tools and the specificity of nuclear maintenance operation have led EDF R and D to develop its own motion planning tools in collaboration with LAAS-CNRS, Utrecht University and the software publisher CADCENTRE within the framework of the three years Esprit LTR project MOLOG. EDF users needs will be summed up in the first part of the paper under the title ''Motion feasibility studies for maintenance operation'' and then compared to the current industrial offer in the ''Software's background'''s part. The definition and objectives ''Towards motion planning tools'' follows. It explains why maintenance preparation pertains to automatic motion planning and how it makes studies much simpler. The ''MOLOG's Benchmark and first result'''s part describes the test-case used to evaluate the MOLOG project and gives an outlook at the results obtained so far. (author)

  20. Environmental restoration and waste management site-specific plan for Richland Operations Office

    International Nuclear Information System (INIS)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs

  1. Plan for the Startup of HA-21I Furnace Operations at the Plutonium Finishing Plant (PFP)

    International Nuclear Information System (INIS)

    WILLIS, H.T.

    2000-01-01

    Achievement of Thermal Stabilization mission elements require the installation and startup of three additional muffle furnaces for the thermal stabilization of plutonium and plutonium bearing materials at the Plutonium Finishing Plant (PFP). The release to operate these additional furnaces will require an Activity Based Startup Review. The conduct of the Activity Based Startup Review (ABSR) was approved by Fluor Daniel Hanford on October 15, 1999. This plan has been developed with the objective of identifying those activities needed to guide the controlled startup of five furnaces from authorization to unrestricted operations by adding the HA-211 furnaces in an orderly and safe manner after the approval to Startup has been given. The Startup Plan provides a phased approach that bridges the activities between the completion of the Activity Based Startup Review authorizing the use of the three additional furnaces and the unrestricted operation of the five thermal stabilization muffle furnaces. The four phases are: (1) the initiation of five furnace operations using three empty (simulated full) boat charges from HA-211 and two full charges from HC-21C; (2) three furnace operations (one full charge from HA-211 and two full charges from HC-21C); (3) four furnace operations (two full charges from HA-211 and two full charges from HC-21C); and (4) integrated five furnace operations and unrestricted operations. Phase 1 of the Plan will be considered as the cold runs. This Plan also provides management oversight and administrative controls that are to be implemented until unrestricted operations are authorized. It also provides a formal review process for ensuring that all preparations needed for full five furnace operations are completed and formally reviewed prior to proceeding to the increased activity levels associated with five furnace operations. Specific objectives include: (1) To ensure that activities are conducted in a safe manner. (2) To provide supplemental

  2. A Simulation for Managing Complexity in Sales and Operations Planning Decisions

    Science.gov (United States)

    DuHadway, Scott; Dreyfus, David

    2017-01-01

    Within the classroom it is often difficult to convey the complexities and intricacies that go into making sales and operations planning decisions. This article describes an in-class simulation that allows students to gain hands-on experience with the complexities in making forecasting, inventory, and supplier selection decisions as part of the…

  3. Small Explorer project: Submillimeter Wave Astronomy Satellite (SWAS). Mission operations and data analysis plan

    Science.gov (United States)

    Melnick, Gary J.

    1990-01-01

    The Mission Operations and Data Analysis Plan is presented for the Submillimeter Wave Astronomy Satellite (SWAS) Project. It defines organizational responsibilities, discusses target selection and navigation, specifies instrument command and data requirements, defines data reduction and analysis hardware and software requirements, and discusses mission operations center staffing requirements.

  4. Sampling and Analysis Plan Update for Groundwater Monitoring 1100-EM-1 Operable Unit

    International Nuclear Information System (INIS)

    DR Newcomer

    1999-01-01

    This document updates the sampling and analysis plan (Department of Energy/Richland Operations--95-50) to reflect current groundwater monitoring at the 1100-EM-1Operable Unit. Items requiring updating included sampling and analysis protocol, quality assurance and quality control, groundwater level measurement procedure, and data management. The plan covers groundwater monitoring, as specified in the 1993 Record of Decision, during the 5-year review period from 1995 through 1999. Following the 5-year review period, groundwater-monitoring data will be reviewed by Environmental Protection Agency to evaluate the progress of natural attenuation of trichloroethylene. Monitored natural attenuation and institutional controls for groundwater use at the inactive Horn Rapids Landfill was the selected remedy specified in the Record of Decision

  5. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented

  6. Uncertainty and operational considerations in mass prophylaxis workforce planning.

    Science.gov (United States)

    Hupert, Nathaniel; Xiong, Wei; King, Kathleen; Castorena, Michelle; Hawkins, Caitlin; Wu, Cindie; Muckstadt, John A

    2009-12-01

    The public health response to an influenza pandemic or other large-scale health emergency may include mass prophylaxis using multiple points of dispensing (PODs) to deliver countermeasures rapidly to affected populations. Computer models created to date to determine "optimal" staffing levels at PODs typically assume stable patient demand for service. The authors investigated POD function under dynamic and uncertain operational environments. The authors constructed a Monte Carlo simulation model of mass prophylaxis (the Dynamic POD Simulator, or D-PODS) to assess the consequences of nonstationary patient arrival patterns on POD function under a variety of POD layouts and staffing plans. Compared are the performance of a standard POD layout under steady-state and variable patient arrival rates that may mimic real-life variation in patient demand. To achieve similar performance, PODs functioning under nonstationary patient arrival rates require higher staffing levels than would be predicted using the assumption of stationary arrival rates. Furthermore, PODs may develop severe bottlenecks unless staffing levels vary over time to meet changing patient arrival patterns. Efficient POD networks therefore require command and control systems capable of dynamically adjusting intra- and inter-POD staff levels to meet demand. In addition, under real-world operating conditions of heightened uncertainty, fewer large PODs will require a smaller total staff than many small PODs to achieve comparable performance. Modeling environments that capture the effects of fundamental uncertainties in public health disasters are essential for the realistic evaluation of response mechanisms and policies. D-PODS quantifies POD operational efficiency under more realistic conditions than have been modeled previously. The authors' experiments demonstrate that effective POD staffing plans must be responsive to variation and uncertainty in POD arrival patterns. These experiments highlight the need

  7. STS operations planning - Current status and outlook for the future

    Science.gov (United States)

    Lee, C. M.

    1981-01-01

    Consideration is given to the status of Space Shuttle operations planning and outlook for the period 1982-94, with some speculations on Shuttle-related space operations early in the next century. Attention is given to the evolution of Shuttle payload capabilities over the next five years. The following list of near-earth environment factors to be exploited by the Space Shuttle is given: (1) easy control of gravity; (2) absence of atmosphere; (3) a comprehensive view of the earth's surface and atmosphere; (4) isolation of hazardous processes from earth biosphere; (5) freely available light, heat and photovoltaic power; (6) an infinite natural reservoir for the disposal of radioactive waste products; and (7) a super-cold heat sink.

  8. Advanced energy design and operation technologies research: Recommendations for a US Department of Energy multiyear program plan

    Energy Technology Data Exchange (ETDEWEB)

    Brambley, M.R.; Crawley, D.B.; Hostetler, D.D.; Stratton, R.C.; Addision, M.S.; Deringer, J.J.; Hall, J.D.; Selkowitz, S.E.

    1988-12-01

    This document describes recommendations for a multiyear plan developed for the US Department of Energy (DOE) as part of the Advanced Energy Design and Operation Technologies (AEDOT) project. The plan is an outgrowth of earlier planning activities conducted for DOE as part of design process research under the Building System Integration Program (BSIP). The proposed research will produce intelligent computer-based design and operation technologies for commercial buildings. In this document, the concept is explained, the need for these new computer-based environments is discussed, the benefits are described, and a plan for developing the AEDOT technologies is presented for the 9-year period beginning FY 1989. 45 refs., 37 figs., 9 tabs.

  9. Microwave tokamak experiment (MTX) first year of operation and future plans

    International Nuclear Information System (INIS)

    Jackson, M.C.

    1989-01-01

    The Microwave Tokamak Experiment (MTX) at Lawrence Livermore National Laboratory (LLNL) began plasma operations in November 1988, and our main goal is the study of electron-cyclotron heating (ECH) in plasma discharges. The MTX tokamak was relocated from the Massachusetts Institute of Technology (MIT), and we have re-created plasma parameters that are similar to those generated while the tokamak was at MIT. After stable ohmic operation was achieved, single-pulse FEL heating experiments began. During this phase, the FEL operated at low power levels on the way to its ultimate goal of 2 GW and 140 GHz with a 30-ns pulse length. We have developed a number of new diagnostics to measure these fast FEL pulses and the resulting plasma effects. In this paper, we present results that show the correlation of MTX data with MIT data, some of the operational modifications and procedures used, results to date from preliminary tokamak operations with the FEL, and our near-term operational plans. 7 refs., 8 figs., 1 tab

  10. 78 FR 5830 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations...

    Science.gov (United States)

    2013-01-28

    ...-FXES11120800000F2-123-F2] Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... environmental assessment and proposed habitat conservation plan; request for comment. SUMMARY: We, the U.S. Fish...

  11. Operational radioactive defense waste management plan for the Nevada Test Site

    International Nuclear Information System (INIS)

    1981-07-01

    The Operational Radioactive Defense Waste Management Plan for the Nevada Test Site establishes procedures and methods for the safe shipping, receiving, processing, disposal, and storage of radioactive waste. Included are NTS radioactive waste disposition program guidelines, procedures for radioactive waste management, a description of storage and disposal areas and facilities, and a glossary of specifications and requirements

  12. Using Planning, Scheduling and Execution for Autonomous Mars Rover Operations

    Science.gov (United States)

    Estlin, Tara A.; Gaines, Daniel M.; Chouinard, Caroline M.; Fisher, Forest W.; Castano, Rebecca; Judd, Michele J.; Nesnas, Issa A.

    2006-01-01

    With each new rover mission to Mars, rovers are traveling significantly longer distances. This distance increase raises not only the opportunities for science data collection, but also amplifies the amount of environment and rover state uncertainty that must be handled in rover operations. This paper describes how planning, scheduling and execution techniques can be used onboard a rover to autonomously generate and execute rover activities and in particular to handle new science opportunities that have been identified dynamically. We also discuss some of the particular challenges we face in supporting autonomous rover decision-making. These include interaction with rover navigation and path-planning software and handling large amounts of uncertainty in state and resource estimations. Finally, we describe our experiences in testing this work using several Mars rover prototypes in a realistic environment.

  13. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  14. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  15. Planning Pharmacies: An Operational Method to Find the Best Location

    Directory of Open Access Journals (Sweden)

    Simona Tondelli

    2014-05-01

    Full Text Available The theme of the spatial distribution of the pharmacies on the territory is closely connected to urban planning and to services supply. In Italy, the regulatory change that took place in 2012, triggered partly by the need to adhere more to a constantly changing economic system, has led to a revision of the existing situation, consisting both on the method to quantify the pharmacies distribution and on the efficiency of the service. If Law 27/2012 has effectively allowed municipalities to increase the number of pharmacies that they can settle on the municipal territory, it has also started a process of rethinking the logic of pharmacies location and of their catchment areas. In this framework, the present paper aims to discuss the merits of a regulatory evolutions that sparked the process of liberalization of locations, integrating the law guidelines and goals with an operating logic process, usable and useful to translate goals into planning actions in a continuous dialogue between law and territory, constraints and opportunities, equity and accessibility of the care services. Following this logic operations, we have investigated the urban context of Castelfranco Emilia, assuming the location of new offices on the basis of pharmaceutical analyzes.

  16. Visual analysis of uncertainties in ocean forecasts for planning and operation of off-shore structures

    KAUST Repository

    Hollt, Thomas; Magdy, Ahmed; Chen, Guoning; Gopalakrishnan, Ganesh; Hoteit, Ibrahim; Hansen, Charles D.; Hadwiger, Markus

    2013-01-01

    We present a novel integrated visualization system that enables interactive visual analysis of ensemble simulations used in ocean forecasting, i.e, simulations of sea surface elevation. Our system enables the interactive planning of both the placement and operation of off-shore structures. We illustrate this using a real-world simulation of the Gulf of Mexico. Off-shore structures, such as those used for oil exploration, are vulnerable to hazards caused by strong loop currents. The oil and gas industry therefore relies on accurate ocean forecasting systems for planning their operations. Nowadays, these forecasts are based on multiple spatio-temporal simulations resulting in multidimensional, multivariate and multivalued data, so-called ensemble data. Changes in sea surface elevation are a good indicator for the movement of loop current eddies, and our visualization approach enables their interactive exploration and analysis. We enable analysis of the spatial domain, for planning the placement of structures, as well as detailed exploration of the temporal evolution at any chosen position, for the prediction of critical ocean states that require the shutdown of rig operations. © 2013 IEEE.

  17. Visual analysis of uncertainties in ocean forecasts for planning and operation of off-shore structures

    KAUST Repository

    Hollt, Thomas

    2013-02-01

    We present a novel integrated visualization system that enables interactive visual analysis of ensemble simulations used in ocean forecasting, i.e, simulations of sea surface elevation. Our system enables the interactive planning of both the placement and operation of off-shore structures. We illustrate this using a real-world simulation of the Gulf of Mexico. Off-shore structures, such as those used for oil exploration, are vulnerable to hazards caused by strong loop currents. The oil and gas industry therefore relies on accurate ocean forecasting systems for planning their operations. Nowadays, these forecasts are based on multiple spatio-temporal simulations resulting in multidimensional, multivariate and multivalued data, so-called ensemble data. Changes in sea surface elevation are a good indicator for the movement of loop current eddies, and our visualization approach enables their interactive exploration and analysis. We enable analysis of the spatial domain, for planning the placement of structures, as well as detailed exploration of the temporal evolution at any chosen position, for the prediction of critical ocean states that require the shutdown of rig operations. © 2013 IEEE.

  18. Approach for planning and operation of energy-efficient production systems; Vorgehensweise fuer Planung und Betrieb energieeffizienter Produktionssysteme

    Energy Technology Data Exchange (ETDEWEB)

    Weinert, Nils

    2010-07-02

    The integration of energy efficiency criteria into planning and operating of production systems substantially contributes to resource productivity and thus is an essential prerequisite for global sustainable development. Great potential can be identified for an early consideration of energy efficiency measures in an early planning phase. It is necessary to determine energy requirements during the planning process before the system is implemented. The objective of this thesis is the development of a planning system for the detailed prognosis of a production system's energy consumption. A concept is derived, by which a time based prediction of the amount of energy required by each machine and thus by the whole production system becomes possible. The planning system is methodologically integrated with well established approaches for manufacturing and factory planning. The methodology is based on the separation of production processes into segments, each with specific energy consumption. These segments, which are defined for equipment according to the possible operational states, are called EnergyBlocks. Each EnergyBlock describes the energy consumed and has a fixed or variable duration. A fixed duration results from operational states which last the shortest time technically possible, for example a machine start process. Variable durations represent operational states, whose length are dependant of the production task. Examples are manufacturing processes. The energy consumption of one block is mathematically described using power series. The energy consumption profile of a planned, not yet realized production process is modeled by arranging the EnergyBlocks to sequences. Depending on when the developed planning system is applied in the process of manufacturing and factory planning, energy consumption prognosis can be calculated as a power profile or as total consumption values, using the same model for both cases. Thus, the information density can be chosen

  19. Operational considerations for implementing regional sediment management plans in the northern Gulf of Mexico

    Science.gov (United States)

    Underwood, Steven G.; Khalil, Syed M.; Byrnes, Mark R.; Steyer, Gregory D.; Raynie, Richard C

    2015-01-01

    Development of a comprehensive and stakeholder-driven Regional Sediment Management plan can provide the basis for long-term sustainable resource use and protection. This paper highlights three operational components that can positively influence sediment management at a regional scale, including (1) integration of an operational sediment budget, (2) development of a monitoring and adaptive management plan, and (3) development of a regional sediment availability and allocation program. These components seek to incorporate science and adaptive management through implementation of an organized and well-documented decision making process. They represent a coordinated framework that could serve as a guide for unifying financial investments in regional sediment management plans. Collectively, they establish an integrated process for addressing uncertainties about future system change in light of shrinking federal and state budgets, competing demands for sediment resources within riverine and marine waters, and policy considerations related to sediment/water use (e.g., navigation and commerce versus environmental management).

  20. 77 FR 36579 - Establishing Indicators to Determine Whether State Plan Operations Are at Least as Effective as...

    Science.gov (United States)

    2012-06-19

    ...] Establishing Indicators to Determine Whether State Plan Operations Are at Least as Effective as Federal OSHA... establishing definitions and measures to determine whether OSHA-approved State Plans for occupational safety and health (State Plans) are at least as effective as the Federal OSHA program as required by the...

  1. Expanding transportation systems management and operations (TSM&O) from planning to construction primer.

    Science.gov (United States)

    2015-12-01

    The Florida Department of Transportation (FDOT) has initiated business plans to promote the Transportation : Systems Management and Operations (TSM&O) program throughout the State. TSM&O is traditionally managed : by traffic engineers that focus on o...

  2. Use of technology to support information needs for continuity of operations planning in public health: a systematic review.

    Science.gov (United States)

    Reeder, Blaine; Turner, Anne; Demiris, George

    2010-01-01

    Continuity of operations planning focuses on an organization's ability to deliver essential services before, during and after an emergency. Public health leaders must make decisions based on information from many sources and their information needs are often facilitated or hindered by technology. The aim of this study is to provide a systematic review of studies of technology projects that address public health continuity of operations planning information needs and to discuss patterns, themes, and challenges to inform the design of public health continuity of operations information systems. To return a comprehensive results set in an under-explored area, we searched broadly in the Medline and EBSCOHost bibliographic databases using terms from prior work in public health emergency management and continuity of operations planning in other domains. In addition, we manually searched the citation lists of publications included for review. A total of 320 publications were reviewed. Twenty studies were identified for inclusion (twelve risk assessment decision support tools, six network and communications-enabled decision support tools, one training tool and one dedicated video-conferencing tool). Levels of implementation for information systems in the included studies range from proposed frameworks to operational systems. There is a general lack of documented efforts in the scientific literature for technology projects about public health continuity of operations planning. Available information about operational information systems suggest inclusion of public health practitioners in the design process as a factor in system success.

  3. Remedial investigation/feasibility study work plan for the 100-FR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-3 operable unit. The 100-K Area consists of the 100-FR-3 groundwater operable unit and two source operable units. The 100-FR-3 operable unit includes all contamination found in the aquifer soils and water beneath the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination. A separate work plan has been initiated for the 100-FR-1 source operable unit (DOE-RL 1992a)

  4. Remedial investigation/feasibility study work plan for the 100-FR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-08-01

    Four areas of the Hanford Site (the 100, 200,300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-1 operable unit. The 100-FR-1 source operable unit is one of two source operable units in the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination. The groundwater affected or potentially affected by the entire 100-F Area is considered as a separate operable unit, the 100-FR-3 groundwater operable unit. A separate work plan has been initiated for the 100-FR-3 operable unit (DOE/RL 1992a)

  5. Considerations on smart grid developments and impacts on transmission operation and planning

    NARCIS (Netherlands)

    Ribeiro, P.F.; Nguyen, P.H.; Kling, W.L.

    2012-01-01

    This paper discusses some historical and technical events, particularly in USA and Europe, over the last few years, that are aimed at modernizing the electric power grid. The paper also looks at possible impacts on transmission operation and planning as the system moves from a centralized to a

  6. Operation and planning of coordinated natural gas and electricity infrastructures

    Science.gov (United States)

    Zhang, Xiaping

    Natural gas is becoming rapidly the optimal choice for fueling new generating units in electric power system driven by abundant natural gas supplies and environmental regulations that are expected to cause coal-fired generation retirements. The growing reliance on natural gas as a dominant fuel for electricity generation throughout North America has brought the interaction between the natural gas and power grids into sharp focus. The primary concern and motivation of this research is to address the emerging interdependency issues faced by the electric power and natural gas industry. This thesis provides a comprehensive analysis of the interactions between the two systems regarding the short-term operation and long-term infrastructure planning. Natural gas and renewable energy appear complementary in many respects regarding fuel price and availability, environmental impact, resource distribution and dispatchability. In addition, demand response has also held the promise of making a significant contribution to enhance system operations by providing incentives to customers for a more flat load profile. We investigated the coordination between natural gas-fired generation and prevailing nontraditional resources including renewable energy, demand response so as to provide economical options for optimizing the short-term scheduling with the intense natural gas delivery constraints. As the amount and dispatch of gas-fired generation increases, the long-term interdependency issue is whether there is adequate pipeline capacity to provide sufficient gas to natural gas-fired generation during the entire planning horizon while it is widely used outside the power sector. This thesis developed a co-optimization planning model by incorporating the natural gas transportation system into the multi-year resource and transmission system planning problem. This consideration would provide a more comprehensive decision for the investment and accurate assessment for system adequacy and

  7. Evaluation of Crew-Centric Onboard Mission Operations Planning and Execution Tool: Year 2

    Science.gov (United States)

    Hillenius, S.; Marquez, J.; Korth, D.; Rosenbaum, M.; Deliz, Ivy; Kanefsky, Bob; Zheng, Jimin

    2018-01-01

    Currently, mission planning for the International Space Station (ISS) is largely affected by ground operators in mission control. The task of creating a week-long mission plan for ISS crew takes dozens of people multiple days to complete, and is often created far in advance of its execution. As such, re-planning or adapting to changing real-time constraints or emergent issues is similarly taxing. As we design for future mission operations concepts to other planets or areas with limited connectivity to Earth, more of these ground-based tasks will need to be handled autonomously by the crew onboard.There is a need for a highly usable (including low training time) tool that enables efficient self-scheduling and execution within a single package. The ISS Program has identified Playbook as a potential option. It already has high crew acceptance as a plan viewer from previous analogs and can now support a crew self-scheduling assessment on ISS or on another mission. The goals of this work, a collaboration between the Human Research Program and the ISS Program, are to inform the design of systems for more autonomous crew operations and provide a platform for research on crew autonomy for future deep space missions. Our second year of the research effort have included new insights on the crew self-scheduling sessions performed by the crew through use on the HERA (Human Exploration Research Analog) and NEEMO (NASA Extreme Environment Mission Operations) analogs. Use on the NEEMO analog involved two self-scheduling strategies where the crew planned and executed two days of EVAs (Extra-Vehicular Activities). On HERA year two represented the first HERA campaign where we were able to perform research tasks. This involved selected flexible activities that the crew could schedule, mock timelines where the crew completed more complex planning exercises, usability evaluation of the crew self-scheduling features, and more insights into the limit of plan complexity that the crew

  8. CT pre-operative planning of a new semi-implantable bone conduction hearing device

    Energy Technology Data Exchange (ETDEWEB)

    Law, Eric K.C.; Bhatia, Kunwar S.S. [Prince of Wales Hospital, The Chinese University of Hong Kong, Department of Imaging and Interventional Radiology, Hong Kong, SAR (China); Tsang, Willis S.S.; Tong, Michael C.F. [Prince of Wales Hospital, The Chinese University of Hong Kong, Department of Otorhinolaryngology, Head and Neck Surgery, Hong Kong, SAR (China); Shi, Lin [The Chinese University of Hong Kong, Department of Medicine and Therapeutics, Hong Kong, SAR (China); The Chinese University of Hong Kong, Chow Yuk Ho Technology Center for Innovative Medicine, Hong Kong, SAR (China)

    2016-06-15

    Accommodating a novel semi-implantable bone conduction hearing device within the temporal bone presents challenges for surgical planning. This study describes the utility of CT in pre-operative assessment of such an implant. Retrospective review of pre-operative CT, clinical and surgical records of 16 adults considered for device implantation. Radiological suitability was assessed on CT using 3D simulation software. Antero-posterior (AP) dimensions of the mastoid bone and minimum skull thickness were measured. CT planning results were correlated with operative records. Eight and five candidates were suitable for device placement in the transmastoid and retrosigmoid positions, respectively, and three were radiologically unsuitable. The mean AP diameter of the mastoid cavity was 14.6 mm for the transmastoid group and 4.6 mm for the retrosigmoid group (p < 0.05). Contracted mastoid and/or prior surgery were predisposing factors for unsuitability. Four transmastoid and five retrosigmoid positions required sigmoid sinus/dural depression and/or use of lifts due to insufficient bone capacity. A high proportion of patients being considered have contracted or operated mastoids, which reduces the feasibility of the transmastoid approach. This finding combined with the complex temporal bone geometry illustrates the importance of careful CT evaluation using 3D software for precise device simulation. (orig.)

  9. Applicable value of real time interventional ultrasound guidance in family planning reproduction operation

    International Nuclear Information System (INIS)

    Wu Guoping; Zou Dongfang; Sun Jian; Dong Weihua

    2007-01-01

    Objective: To determine the clinical value of real time interventional ultrasound guidance in family planning reproduction operation. Methods: Under the guidance of ultrasound monitoring, 522 cases with high risk and difficult uterine operation were undertaken in our department. Results: The abdominal endoscopic contraceptive uterine operation under real time ultrasound monitoring was carried out for 522 cases in 4 years, with successful rates for high risk pregnancy as 287/289 cases, high risk troublesome withdrawal of contraceptive ring as 129/130 cases and puzzling uterine operation as 103/103 cases. The total successful rate reached 99.42%, without uterine rupture and other complications. Conclusion: The former complex, blind and difficult uterine operations turn to be simple, safe and reliable under the guidance of real time ultrasound. (authors)

  10. Applying 3D-printing technology in planning operations of cancer patients

    Science.gov (United States)

    Kashapov, L. N.; N, A. N. Rudyk A.; Kashapov, R. N.

    2014-12-01

    The purpose of this work was creation 3D model of the front part of the skull of the patient and evaluates the effectiveness of its use in the planning of the operation. To achieve this goal was chosen an operation to remove a tumor of the right eyelid, germinate in the zygomatic bone. 3D printing was performed at different peripheral devices using the method of layering creating physical objects by a digital 3D model as well as the recovery model of the skull with the entire right malar bone for fixation on her titanium frame to maintain the eyeball in a fixed state.

  11. Hungry Horse Mitigation Plan; Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam, 1990-2003 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fraley, John J.; Marotz, Brian L. (Montana Department of Fish, Wildlife and Parks, Helena, MT); DosSantos, Joseph M. (Confederated Salish and Kootenai Tribes of the Flathead Nation, Pablo, MT)

    2003-04-01

    In this document we present fisheries losses, mitigation alternatives, and recommendations to protect, mitigate, and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan addresses six separate program measures in the 1987 Columbia Basin Fish and Wildlife Program. We designed the plan to be closely coordinated in terms of dam operations, funding, and activities with the Kerr Mitigation Plan presently before the Federal Energy Regulatory Commission. This document represents a mitigation plan for consideration by the Northwest Power Planning Council process; it is not an implementation plan. Flathead Lake is one of the cleanest lakes of its size in the world. The exceptional water quality and unique native fisheries make the Flathead Lake/River system extremely valuable to the economy and quality of life in the basin. The recreational fishery in Flathead Lake has an estimated value of nearly eight million dollars annually. This mitigation process represents our best opportunity to reduce the impacts of hydropower in this valuable aquatic system and increase angling opportunity. We based loss estimates and mitigation alternatives on an extensive data base, agency reports, nationally and internationally peer-reviewed scientific articles, and an innovative biological model for Hungry Horse Reservoir and the Flathead River. We conducted an extensive, 14-month scoping and consultation process with agency representatives, representatives of citizen groups, and the general public. This consultation process helped identify issues, areas of agreement, areas of conflict, and advantages and disadvantages of mitigation alternatives. The results of the scoping and consultation process helped shape our mitigation plan. Our recommended plan is based firmly on principles of adaptive management and recognition of biological uncertainty. After we receive direction from the NPPC, we will add more detailed hypotheses and

  12. SIMULATION OF CARS ACCUMULATION PROCESSES FOR SOLVING TASKS OF OPERATIONAL PLANNING IN CONDITIONS OF INITIAL INFORMATION UNCERTAINTY

    Directory of Open Access Journals (Sweden)

    О. A. Tereshchenko

    2017-06-01

    Full Text Available Purpose. The article highlights development of the methodological basis for simulation the processes of cars accumulation in solving operational planning problems under conditions of initial information uncertainty for assessing the sustainability of the adopted planning scenario and calculating the associated technological risks. Methodology. The solution of the problem under investigation is based on the use of general scientific approaches, the apparatus of probability theory and the theory of fuzzy sets. To achieve this purpose, the factors influencing the entropy of operational plans are systematized. It is established that when planning the operational work of railway stations, sections and nodes, the most significant factors that cause uncertainty in the initial information are: a external conditions with respect to the railway ground in question, expressed by the uncertainty of the timing of cars arrivals; b external, hard-to-identify goals for the functioning of other participants in the logistics chain (primarily customers, expressed by the uncertainty of the completion time with the freight cars. These factors are suggested to be taken into account in automated planning through statistical analysis – the establishment and study of the remaining time (prediction errors. As a result, analytical dependencies are proposed for rational representation of the probability density functions of the time residual distribution in the form of point, piecewise-defined and continuous analytic models. The developed models of cars accumulation, the application of which depends on the identified states of the predicted incoming car flow to the accumulation system, are presented below. In addition, the last proposed model is a general case of models of accumulation processes with an arbitrary level of reliability of the initial information for any structure of the incoming flow of cars. In conclusion, a technique for estimating the results of

  13. Using mean duration and variation of procedure times to plan a list of surgical operations to fit into the scheduled list time.

    Science.gov (United States)

    Pandit, Jaideep J; Tavare, Aniket

    2011-07-01

    It is important that a surgical list is planned to utilise as much of the scheduled time as possible while not over-running, because this can lead to cancellation of operations. We wished to assess whether, theoretically, the known duration of individual operations could be used quantitatively to predict the likely duration of the operating list. In a university hospital setting, we first assessed the extent to which the current ad-hoc method of operating list planning was able to match the scheduled operating list times for 153 consecutive historical lists. Using receiver operating curve analysis, we assessed the ability of an alternative method to predict operating list duration for the same operating lists. This method uses a simple formula: the sum of individual operation times and a pooled standard deviation of these times. We used the operating list duration estimated from this formula to generate a probability that the operating list would finish within its scheduled time. Finally, we applied the simple formula prospectively to 150 operating lists, 'shadowing' the current ad-hoc method, to confirm the predictive ability of the formula. The ad-hoc method was very poor at planning: 50% of historical operating lists were under-booked and 37% over-booked. In contrast, the simple formula predicted the correct outcome (under-run or over-run) for 76% of these operating lists. The calculated probability that a planned series of operations will over-run or under-run was found useful in developing an algorithm to adjust the planned cases optimally. In the prospective series, 65% of operating lists were over-booked and 10% were under-booked. The formula predicted the correct outcome for 84% of operating lists. A simple quantitative method of estimating operating list duration for a series of operations leads to an algorithm (readily created on an Excel spreadsheet, http://links.lww.com/EJA/A19) that can potentially improve operating list planning.

  14. Contribution to the operating energy planning of hydrothermal power systems; Contribuicao ao planejamento da operacao energetica de sistemas hidrotermicos de potencia

    Energy Technology Data Exchange (ETDEWEB)

    Carneiro, Adriano Alber de Franca Mendes

    1991-08-01

    This work treats of the problem of the planning of the energy operation of hydrothermal power systems, gone back to those with predominance of hydraulic generation, as it is the case of the Brazilian system. The work makes an analysis of the problem of the planning of the energy operation of systems hydrothermal leaving of the concepts and nature of this problem. Their inherent difficulties are shown and they come the main approaches in operation in countries with predominance of hydroelectric generation. It still introduces the methodology in energy planning in Brazil being pointed their main limitations. Finally an alternative model for the planning of the energy operation of the system brazilian hydrothermal, based on the made studies is also presented.

  15. HEMP emergency planning and operating procedures for electric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. (Electrotek Concepts, Inc., Knoxville, TN (United States))

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  16. 78 FR 13379 - Wrangell-St. Elias National Park and Preserve, Alaska; Proposed Mining Plan of Operations

    Science.gov (United States)

    2013-02-27

    ...] Wrangell-St. Elias National Park and Preserve, Alaska; Proposed Mining Plan of Operations AGENCY: National...) unpatented placer claims within Wrangell-St. Elias National Park and Preserve. Public Availability: This plan...: Wrangell-St. Elias National Park and Preserve Headquarters, Mile 106.8 Richardson Highway, Post Office Box...

  17. Co-operative planning by utilities and local authorities. A solution to solve climate change?

    International Nuclear Information System (INIS)

    Schlenzing, C.; Steidle, T.

    2001-01-01

    Since the deregulation of German energy markets 1998 we can observe diverging planning interests and priorities of the local communities on one side and the local energy utilities on the other side. This seriously endangers the consensus in local energy planning achieved in the past which will be crucial in order to identify and implement effective greenhouse gas (GHG) mitigation strategies. This paper presents a co-operative planning approach which embeds systems analysis into a well structured communication, mediation and learning process for decision making. This process is supported by the cooperative modeling system MESAP, a software for energy and environmental planning, which integrates different energy models with an energy information system. This allows to combine traditional local energy planning with the more business oriented view of the utilities. The specific design of MESAP allows for a continuous 'sustainable' planning and monitoring similar to business tools for accounting and controlling in companies. (author)

  18. Lageos assembly operation plan

    Science.gov (United States)

    Brueger, J.

    1975-01-01

    Guidelines and constraints procedures for LAGEOS assembly, operation, and design performance are given. Special attention was given to thermal, optical, and dynamic analysis and testing. The operation procedures illustrate the interrelation and sequence of tasks in a flow diagram. The diagram also includes quality assurance functions for verification of operation tasks.

  19. Generic procedure for designing and implementing plan management systems for space science missions operations

    Science.gov (United States)

    Chaizy, P. A.; Dimbylow, T. G.; Allan, P. M.; Hapgood, M. A.

    2011-09-01

    This paper is one of the components of a larger framework of activities whose purpose is to improve the performance and productivity of space mission systems, i.e. to increase both what can be achieved and the cost effectiveness of this achievement. Some of these activities introduced the concept of Functional Architecture Module (FAM); FAMs are basic blocks used to build the functional architecture of Plan Management Systems (PMS). They also highlighted the need to involve Science Operations Planning Expertise (SOPE) during the Mission Design Phase (MDP) in order to design and implement efficiently operation planning systems. We define SOPE as the expertise held by people who have both theoretical and practical experience in operations planning, in general, and in space science operations planning in particular. Using ESA's methodology for studying and selecting science missions we also define the MDP as the combination of the Mission Assessment and Mission Definition Phases. However, there is no generic procedure on how to use FAMs efficiently and systematically, for each new mission, in order to analyse the cost and feasibility of new missions as well as to optimise the functional design of new PMS; the purpose of such a procedure is to build more rapidly and cheaply such PMS as well as to make the latter more reliable and cheaper to run. This is why the purpose of this paper is to provide an embryo of such a generic procedure and to show that the latter needs to be applied by people with SOPE during the MDP. The procedure described here proposes some initial guidelines to identify both the various possible high level functional scenarii, for a given set of possible requirements, and the information that needs to be associated with each scenario. It also introduces the concept of catalogue of generic functional scenarii of PMS for space science missions. The information associated with each catalogued scenarii will have been identified by the above procedure and

  20. Rationale and operational plan for a U.S. high-altitude magnetic survey

    Science.gov (United States)

    Hildenbrand, Thomas G.; Acuna, Mario; Bracken, Robert E.; Hardwick, Doug; Hinze, William J.; Keller, Gordon R.; Phillips, Jeff; Roest, Walter

    2002-01-01

    On August 8, 2002, twenty-one scientists from the federal, private and academic sectors met at a workshop in Denver, Co., to discuss the feasibility of collecting magnetic anomaly data on a Canberra aircraft (Figure 1). The need for this 1-day workshop arose because of an exciting and cost-effective opportunity to collect invaluable magnetic anomaly data during a Canberra mission over the U.S. in 2003 and 2004. High Altitude Mapping Missions (HAMM) is currently planning a mission to collect Interferometric Synthetic Aperture Radar (IFSAR) imagery at an altitude of about 15 km and with a flight-line spacing of about 18 km over the conterminous U.S. and Alaska. The additional collection of total and vector magnetic field data would represent a secondary mission objective (i.e., a "piggy-back" magnetometer system). Because HAMM would fund the main flight costs of the mission, the geomagnetic community would obtain invaluable magnetic data at a nominal cost. These unique data would provide new insights on fundamental tectonic and thermal processes and give a new view of the structural and lithologic framework of the crust and possibly the upper mantle. This document highlights: (1) the reasons to conduct this national survey and (2) a preliminary operational plan to collect high-altitude magnetic data of a desired quality and for the expected resources. Although some operational plan issues remain to be resolved, the important conclusions of the workshop are that the Canberra is a very suitable platform to measure the magnetic field and that the planned mission will result in quality high-altitude magnetic data to greatly expand the utility of our national magnetic database.

  1. Plan for the design, development, and implementation, and operation of the National Water Information System

    Science.gov (United States)

    Edwards, M.D.

    1987-01-01

    The Water Resources Division of the U.S. Geological Survey is developing a National Water Information System (NWIS) that will integrate and replace its existing water data and information systems of the National Water Data Storage and Retrieval System, National Water Data Exchange, National Water-Use Information, and Water Resources Scientific Information Center programs. It will be a distributed data system operated as part of the Division 's Distributed Information System, which is a network of computers linked together through a national telecommunication network known as GEONET. The NWIS is being developed as a series of prototypes that will be integrated as they are completed to allow the development and implementation of the system in a phased manner. It also is being developed in a distributed manner using personnel who work under the coordination of a central NWIS Project Office. Work on the development of the NWIS began in 1983 and it is scheduled for completion in 1990. This document presents an overall plan for the design, development, implementation, and operation of the system. Detailed discussions are presented on each of these phases of the NWIS life cycle. The planning, quality assurance, and configuration management phases of the life cycle also are discussed. The plan is intended to be a working document for use by NWIS management and participants in its design and development and to assist offices of the Division in planning and preparing for installation and operation of the system. (Author 's abstract)

  2. New problem with sales, inventories, and operations planning in a supply chain environment

    Science.gov (United States)

    Thomas, Andre; Lamouri, Samir

    2000-10-01

    The highest level of planning and control system is necessary, because production and logistics systems are not so flexible to follow, from day to day, sales evolutions. The companies are therefore held to standardize the good practices concerning the elaboration of their Sales, Inventories and Operations Planning (SIOP). The SIOP makes it possible to implement the strategic objectives defined by Top Management at the time of the Business Plan. It is the link between sales and manufacturing planning. The objectives of each of those depend on the specificity of their trade: the Sales Department will go for a maximum sales whereas Production will endeavor to keep industrial cost prices as low as possible while the Finance Department will try to optimize the use of available funds. There are several tools for this optimization: Graphical method and linear programming. Today, the economic context requires robust optimization.

  3. Use of the Homeland-Defense Operational Planning System (HOPS) for Emergency Management

    International Nuclear Information System (INIS)

    Durling, Jr. R.L.; Price, D.E.

    2005-01-01

    The Homeland-Defense Operational Planning System (HOPS), is a new operational planning tool leveraging Lawrence Livermore National Laboratory's expertise in weapons systems and in sparse information analysis to support the defense of the U.S. homeland. HOPS provides planners with a basis to make decisions to protect against acts of terrorism, focusing on the defense of facilities critical to U.S. infrastructure. Criticality of facilities, structures, and systems is evaluated on a composite matrix of specific projected casualty, economic, and sociopolitical impact bins. Based on these criteria, significant unidentified vulnerabilities are identified and secured. To provide insight into potential successes by malevolent actors, HOPS analysts strive to base their efforts mainly on unclassified open-source data. However, more cooperation is needed between HOPS analysts and facility representatives to provide an advantage to those whose task is to defend these facilities. Evaluated facilities include: refineries, major ports, nuclear power plants and other nuclear licensees, dams, government installations, convention centers, sports stadiums, tourist venues, and public and freight transportation systems. A generalized summary of analyses of U.S. infrastructure facilities will be presented

  4. Remedial investigation/feasibility study work plan for the 100-BC-5 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The Tri-Party Agreement requires that the cleanup programs at the Hanford Site integrate the requirements of CERCLA, RCRA, and Washington State's dangerous waste (the state's RCRA-equivalent) program. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  5. Department of Energy’s ARM Climate Research Facility External Data Center Operations Plan Located At Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Cialella, A. [Brookhaven National Lab. (BNL), Upton, NY (United States); Gregory, L. [Brookhaven National Lab. (BNL), Upton, NY (United States); Lazar, K. [Brookhaven National Lab. (BNL), Upton, NY (United States); Liang, M. [Brookhaven National Lab. (BNL), Upton, NY (United States); Ma, L. [Brookhaven National Lab. (BNL), Upton, NY (United States); Tilp, A. [Brookhaven National Lab. (BNL), Upton, NY (United States); Wagener, R. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2015-05-01

    The External Data Center (XDC) Operations Plan describes the activities performed to manage the XDC, located at Brookhaven National Laboratory (BNL), for the Department of Energy’s Atmospheric Radiation Measurement (ARM) Climate Research Facility. It includes all ARM infrastructure activities performed by the Data Management and Software Engineering Group (DMSE) at BNL. This plan establishes a baseline of expectation within the ARM Operations Management for the group managing the XDC.

  6. Proposed plan for interim remedial measures at the 100-KR-1 Operable Unit. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites that include contaminated soils and structures at the 100-KR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this Operable Unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that pose potential threats to human health and the environment. This proposed plan is being issued by the US Environmental Protection Agency (EPA), the lead regulatory agency; the Washington State Department of Ecology (Ecology), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. The EPA, Ecology, and the DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Law.'' This proposed plan is intended to be a fact sheet for public review which briefly describes the remedial alternatives analyzed, identifies a preferred alternative, and summarizes the information relied upon to recommend the preferred alternative

  7. Optimal planning and operation of aggregated distributed energy resources with market participation

    International Nuclear Information System (INIS)

    Calvillo, C.F.; Sánchez-Miralles, A.; Villar, J.; Martín, F.

    2016-01-01

    Highlights: • Price-maker optimization model for planning and operation of aggregated DER. • 3 Case studies are proposed, considering different electricity pricing scenarios. • Analysis of benefits and effect on electricity prices produced by DER aggregation. • Results showed considerable benefits even for relatively small aggregations. • Results suggest that the impact on prices should not be overlooked. - Abstract: This paper analyzes the optimal planning and operation of aggregated distributed energy resources (DER) with participation in the electricity market. Aggregators manage their portfolio of resources in order to obtain the maximum benefit from the grid, while participating in the day-ahead wholesale electricity market. The goal of this paper is to propose a model for aggregated DER systems planning, considering its participation in the electricity market and its impact on the market price. The results are the optimal planning and management of DER systems, and the appropriate energy transactions for the aggregator in the wholesale day-ahead market according to the size of its aggregated resources. A price-maker approach based on representing the market competitors with residual demand curves is followed, and the impact on the price is assessed to help in the decision of using price-maker or price-taker approaches depending on the size of the aggregated resources. A deterministic programming problem with two case studies (the average scenario and the most likely scenario from the stochastic ones), and a stochastic one with a case study to account for the market uncertainty are described. For both models, market scenarios have been built from historical data of the Spanish system. The results suggest that when the aggregated resources have enough size to follow a price-maker approach and the uncertainty of the markets is considered in the planning process, the DER systems can achieve up to 50% extra economic benefits, depending on the market

  8. Effect of stage development of mining operations on maximization the net present value in long-term planning of open pits

    OpenAIRE

    Kržanović, Daniel; Rajković, Radmilo; Mikić, Miomir; Ljubojev, Milenko

    2014-01-01

    Long-term planning in the mining industry has one main goal: maximizing the value that is realized by excavation and processing of mineral resources. When designing the open pits, determining the stages of development the mining operations, (eng. Pushback) is one of the important factors in the process of long-term production planning. Using the different scientific methods and mathematical algorithms underlying the operation of modern software for strategic planning of production, it is poss...

  9. Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

    Science.gov (United States)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

  10. A bi-level integrated generation-transmission planning model incorporating the impacts of demand response by operation simulation

    International Nuclear Information System (INIS)

    Zhang, Ning; Hu, Zhaoguang; Springer, Cecilia; Li, Yanning; Shen, Bo

    2016-01-01

    Highlights: • We put forward a novel bi-level integrated power system planning model. • Generation expansion planning and transmission expansion planning are combined. • The effects of two sorts of demand response in reducing peak load are considered. • Operation simulation is conducted to reflect the actual effects of demand response. • The interactions between the two levels can guarantee a reasonably optimal result. - Abstract: If all the resources in power supply side, transmission part, and power demand side are considered together, the optimal expansion scheme from the perspective of the whole system can be achieved. In this paper, generation expansion planning and transmission expansion planning are combined into one model. Moreover, the effects of demand response in reducing peak load are taken into account in the planning model, which can cut back the generation expansion capacity and transmission expansion capacity. Existing approaches to considering demand response for planning tend to overestimate the impacts of demand response on peak load reduction. These approaches usually focus on power reduction at the moment of peak load without considering the situations in which load demand at another moment may unexpectedly become the new peak load due to demand response. These situations are analyzed in this paper. Accordingly, a novel approach to incorporating demand response in a planning model is proposed. A modified unit commitment model with demand response is utilized. The planning model is thereby a bi-level model with interactions between generation-transmission expansion planning and operation simulation to reflect the actual effects of demand response and find the reasonably optimal planning result.

  11. Transformation reborn: A new generation expert system for planning HST operations

    Science.gov (United States)

    Gerb, Andrew

    1991-01-01

    The Transformation expert system (TRANS) converts proposals for astronomical observations with the Hubble Space Telescope (HST) into detailed observing plans. It encodes expert knowledge to solve problems faced in planning and commanding HST observations to enable their processing by the Science Operations Ground System (SOGS). Among these problems are determining an acceptable order of executing observations, grouping of observations to enhance efficiency and schedulability, inserting extra observations when necessary, and providing parameters for commanding HST instruments. TRANS is currently an operational system and plays a critical role in the HST ground system. It was originally designed using forward-chaining provided by the OPS5 expert system language, but has been reimplemented using a procedural knowledge base. This reimplementation was forced by the explosion in the amount of OPS5 code required to specify the increasingly complicated situations requiring expert-level intervention by the TRANS knowledge base. This problem was compounded by the difficulty of avoiding unintended interaction between rules. To support the TRANS knowledge base, XCL, a small but powerful extension to Commom Lisp was implemented. XCL allows a compact syntax for specifying assignments and references to object attributes. XCL also allows the capability to iterate over objects and perform keyed lookup. The reimplementation of TRANS has greatly diminished the effort needed to maintain and enhance it. As a result of this, its functions have been expanded to include warnings about observations that are difficult or impossible to schedule or command, providing data to aid SPIKE, an intelligent planning system used for HST long-term scheduling, and providing information to the Guide Star Selection System (GSSS) to aid in determination of the long range availability of guide stars.

  12. Aquifer test plan for the 100-HR-3 Operable Unit

    International Nuclear Information System (INIS)

    Swanson, L.C.; Hartman, M.J.

    1994-01-01

    This test plan directs hydrologic testing activities planned at three existing Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) wells in the 100-HR-3 Operable Unit of the Hanford Site. Three additional wells will be installed near these existing wells and used as additional testing arid observation points during the field activities. Figure 1 shows the locations of the three test sites. A primary objective of the testing program is to provide more detailed hydraulic characterization information for the unconfined aquifer and targeted test sites than provided by the initial reconnaissance-level slug testing of Vukelich. A second objective is to evaluate the applicability of slug interference and dipole flow tests for detailed hydraulic characterization in an unconfined aquifer. This aquifer testing program will also be useful for substantiating hydraulic conductivities reported from previous slug tests and evaluating the effects of filter pack volume/configuration on slug test data. Vukelich recommended additional testing to address the latter two issues

  13. A modularized framework for sales and operations planning with focus on process industries

    Directory of Open Access Journals (Sweden)

    Sayeh Noroozi

    2016-01-01

    Full Text Available This paper suggests a modularized sales and operations planning (S&OP framework, consisting of content and process. The framework’s content is based on a typology of decoupling points in which the effect of decoupling points on the decision variables in S&OP is studied. The framework’s process takes a step back and addresses the need for a more elaborate design to precede the operational use of S&OP content for different production contexts. The framework supports both process industries (PIs and discrete manufacturing industries (DIs, and recognizes their specific requirements and reflects them in their S&OP. The differentiating characteristics of PIs and DIs are emphasized through three different decoupling points, namely: discretization decoupling point, control mode decoupling point, and customer order decoupling point. The suggested framework aims to fill the gap in the literature regarding the lack of aggregate planning processes that match the PIs’ specific requirements by reflecting the differentiating characteristics of PIs in S&OP.

  14. Operational plan of Iran saffron’s branding

    Directory of Open Access Journals (Sweden)

    Abolfazl Masoomzadeh Zavareh

    2014-03-01

    Full Text Available Despite the extensive production and export of saffron in Iran, we have no strong and credible brand of Iranian saffron in global market. In other words, the absence of strong brands in the global market has made almost no name of Iran in these markets. Thus, it is useful to aware of the importance of branding for export crops such as saffron and exploring the solutions of leading brands using in the global market. The present study with regard to theoretical foundations, comparative studies and by using the opinions of saffron industry experts via in-depth interview and questionnaire, have addressed the challenges facing the industry, and Using SWOT matrix for formulating branding strategies and operational plans. The results of the study show that branding in the industry is so weak and has a lot of weaknesses and threats. Therefore, to develop branding in the industry, four main strategy categories were presented. By using these strategies we can guarantee the improvement in the industry.

  15. Richland Operations Office (DOE-RL) Implementation Plan for DOE Order 435.1

    International Nuclear Information System (INIS)

    FRITZ, D.W.

    2000-01-01

    The U.S. Department of Energy issued U.S. Department of Energy Order 435.1, Radioactive Waste Management, and U.S. Department of Energy Manual 435.1-1, Radioactive Waste Management Manual, on July 9, 1999, to replace U.S. Department of Energy Order 5820.2A. Compliance is required by July 9, 2000, where compliance is defined as ''implementing the requirements, or an approved implementation, or corrective action plan'' (refer to Manual, Introduction, paragraph four). This implementation plan identifies the status of each requirement for U.S. Department of Energy, Richland Operations Office Site contractors, and provides the plan, cost, and length of time required for achieving full implementation. The U.S. Department of Energy, Richland Operations Office contractors (Fluor Hanford, Incorporated, DynCorp Tri-Cities Services, Bechtel Hanford, Inc., and Pacific Northwest National Laboratory) conducted a line-by-line review of DOE Order 435.1 and associated manuals to determine which requirements were new, and which requirements already are used for compliance with the previous DOE Order 5820.2A or other requirements. The Gap Analysis for DOE Order 435.1 (HNF-5465) identified compliance gaps, along with other issues that would impact efforts for achieving compliance. The gap analysis also contained a series of assumptions made by the various projects in determining compliance status. The details and section-by-section analysis are contained in Appendix A. Some of the DOE Order 435.1 requirements invoke sections of other DOE Orders not incorporated in various U.S. Department of Energy, Richland Operations Office contracts (refer to Section 2.0, Table 2-1). Those additional DOE Orders are identified by contractor and will be left for evaluation in accordance with each contractor's requirements. No attempt was made to evaluate all of those orders at this time, although in many cases, contractors follow a similar older DOE Order, which is cited in the Appendix. In some areas

  16. Challenges of Measuring Performance of the Sales and Operations Planning Process

    OpenAIRE

    Hulthén, Hana; Näslund, Dag; Norrman, Andreas

    2017-01-01

    The purpose of this study is to identify and structure challenges of measuring performance of the Sales and Operations Planning (S&OP) process. A multiple case study methodology was applied. Qualitative data was collected via 22 structured interviews with managers from six case companies in various industries. A process oriented framework was proposed by structuring the challenges based on two key areas of process performance (effectiveness and efficiency) and different maturity levels of the...

  17. Shippingport Atomic Power Station Operating Experience, Developments and Future Plans

    International Nuclear Information System (INIS)

    Feinroth, H.; Oldham, G.M.; Stiefel, J.T.

    1963-01-01

    This paper describes and evaluates five years of operation and test of the Shippingport Atomic Power Station and discusses the current technical developments and future plans of the Shippingport programme. This programme is directed towards development of the basic technology of light-water reactors to provide the basis for potential reduction in the costs of nuclear power. The Shippingport reactor plant has operated for over five years and has been found to integrate readily into a utility system either as a base load or peak load unit. Plant component performance has been reliable. There have been no problems in contamination or waste disposal. Access to primary coolant components for maintenance has been good, demonstrating the integrity of fuel elements. Each of the three refuelling operations performed since start-up of Shippingport has required successively less time to accomplish. Recently, the third seed was refuelled in 32 working days, about one quarter the time required for the first refuelling. The formal requirements of personnel training, written administrative procedures, power plant manuals, etc., which have been a vital factor in the successful implementation of the Shippingport programme, are described. The results obtained from the comprehensive test programme carried out at Shippingport are compared with calculations, and good agreement has been obtained. Reactor core performance, plant stability, and response to load changes, fuel element and control rod performance, long-term effects such as corrosion and radiation level build-up, component performance, etc., are discussed in this paper. The principal objective of the current and future programmes of the Shippingport Project in advancing the basic technology of water-cooled reactors is discussed. This programme includes the continued operation of the Shippingport plant, and the development, design, manufacture and test operation of a long-life, highpower density second core - Core 2. At its

  18. Sales and operations planning : design and implementation of S&OP process in a multinational company

    OpenAIRE

    Lima, Gonçalo Maria Eva Ferreira Neves

    2013-01-01

    The company under scrutiny in this thesis is Aker Solutions Process Systems. As a part of the Aker Solutions group, Process Systems is a leading global supplier of processing equipment for oil, water and gas, operating worldwide. The company´s operational objective when implementing this process was to optimize the utilization of resources in it´s five different Business Units. The actions undertaken by the company to develop and implement a Sales and Operations Planning proces...

  19. Impact of climate change on operations and planning of Hydro-Quebec's generation system

    International Nuclear Information System (INIS)

    Raymond, M.P.; Houle, B.; Robert, S.

    2008-01-01

    Studies that are underway at OURANOS indicate that some of the probable climate change scenarios in the coming years will have an effect on Quebec's watersheds hydrology and on temperatures. For Hydro-Quebec, who draws more than 95% of its generation from hydraulic resources and whose electricity loads depend pretty much on temperatures, such climate changes will definitely have a significant impact on many aspects of the planning and operations of its system. Our presentation will be divided into three parts. First, to bridge the gap between climate change scientists and water managers, we will present a list of the types of parameters needed from the scientists in order for the water managers to assess the impacts of climate changes on a hydroelectric system such as Hydro-Quebec's. These parameters will include changes in annual and seasonal distribution and variability of natural inflows and, most importantly, the timing of the changes in the coming years. The second part will focus on the types of adaptive decisions and strategies that will have to be taken ahead of time in order to implement the changes on a hydroelectric generation system such as Hydro-Quebec's. They will cover different areas such as generation planning, operations planning and optimization, refurbishment and replacement of infrastructures, dam safety, flood control and protection, maintenance planning and reliability. Finally, we will present more specific results of the impact of some climate change scenarios on Hydro-Quebec's overall generation system, showing differences between regions, and a case study on one of its river systems. (author)

  20. Framework for Risk-based Planning of Operation and Maintenance for Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2009-01-01

    , and to sequential optimal decision making on planning of OM taking into account new information. Deterioration mechanisms such as fatigue, corrosion, wear and erosion are associated with significant uncertainty. Observations of the degree of damage can increase the reliability of predictions, especially......For offshore wind turbines, costs to operation and maintenance (OM) are substantial. This paper describes a risk-based life cycle approach for optimal planning of OM. The approach is based on pre-posterior Bayesian decision theory, and can be used both to overall, initial planning of OM...... in connection with condition-based maintenance. The approach can be used for gearboxes, generators, fatigue cracks, corrosion, etc. This paper also describes how probabilistic indicators can be used to quantify indirect information about the damage state for critical components, e.g. gearboxes....

  1. Energy Systems Test Area (ESTA) Battery Test Operations User Test Planning Guide

    Science.gov (United States)

    Salinas, Michael

    2012-01-01

    Test process, milestones and inputs are unknowns to first-time users of the ESTA Battery Test Operations. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

  2. Proposed plan for the 100-IU-1, 100-IU-3, 100-IU-4, AND 100-IU-5 Operable Units

    International Nuclear Information System (INIS)

    1995-06-01

    This proposed plan identifies the preferred alternative for the Riverland Rad Yard, the Wahluke Slope, the Sodium Dichromate Baffel Landfill, and the, White Bluffs Pickling Acid Cribs, located at the Hanford Site. These areas are known respectively as the 100-IU-1, 100-IU-3, 100-IU-4, and 100-IU-5 Operable Units. Between 1992 and 1994, each of the four operable units was the subject of an expedited response action that addressed removal of site contaminants in soil. Waste sites in the 100-IU-2 (White Bluffs Townsite) and 100-IU-6 (Hanford Townsite) Operable Units will be addressed in future proposed plans. A proposed plan is intended to be a fact sheet for public review that summarizes the information relied upon to recommend the preferred alternative. As presented in this proposed plan, no further action is the preferred alternative for the final resolution of the 100-IU-1, 100-IU-3, 100-IU-4, and 100-IU-5 Operable Units. The preferred alternative is recommended because all suspect hazardous substances above cleanup levels have been removed from the waste sites, and the sites are unlikely to pose any significant risk to human health or the environment

  3. Metropolis Parking Problems and Management Planning Solutions for Traffic Operation Effectiveness

    Directory of Open Access Journals (Sweden)

    Yuejun Liu

    2012-01-01

    Full Text Available Advances in mobility are clearly illustrated by the rapid development of urbanization and motorization in developing countries. Following the dramatic incensement of traffic demand, the parking problem has been becoming much more seriously important in many metropolises. With the aim of seeking solutions as to how the parking system could operate more efficiently by using new technologies and new methodologies, this paper discusses the application of geographic information system into the parking planning and management for traffic operation effectiveness in metropolis. The concentration of this paper includes the characteristics of parking demand and the causations of parking problems, especially the basic parking principle and strategies for solving parking problems from the perspective of geographic information system are discussed in enough detail in this paper.

  4. Harvest operations for density management: planning requirements, production, costs, stand damage, and recommendations

    Science.gov (United States)

    Loren D. Kellogg; Stephen J. Pilkerton

    2013-01-01

    Since the early 1990s, several studies have been undertaken to determine the planning requirements, productivity, costs, and residual stand damage of harvest operations in thinning treatments designed to promote development of complex forest structure in order to enhance ecological functioning and biological diversity. Th ese studies include the Oregon State...

  5. RCRA facility investigation/corrective measures study work plan for the 100-HR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US. Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-1 source operable unit. Source operable units include facilities and unplanned release sites that are potential sources of contamination. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Separate work plans have been initiated for the 100-HR-3 groundwater operable unit (DOE-RL 1992a) and the 100-DR-1 (DOE-RL 1992b) source operable units

  6. Designing a Professional Development Plan for the Support Operations Officer of the Forward Support Company

    National Research Council Canada - National Science Library

    Zimmerman, Edward

    1999-01-01

    .... Based on these responsibilities, the research question (Does the Army need to design a specific professional development plan to train CSS lieutenants to serve as support operations officers in the FSC...

  7. Energy operations and planning decision support for systems using weather forecast information

    International Nuclear Information System (INIS)

    Altalo, M.G.

    2004-01-01

    Hydroelectric utilities deal with uncertainties on a regular basis. These include uncertainties in weather, policy and markets. This presentation outlined regional studies to define uncertainty, sources of uncertainty and their affect on power managers, power marketers, power insurers and end users. Solutions to minimize uncertainties include better forecasting and better business processes to mobilize action. The main causes of uncertainty in energy operations and planning include uncaptured wind, precipitation and wind events. Load model errors also contribute to uncertainty in energy operations. This presentation presented the results of a 2002-2003 study conducted by the National Oceanic and Atmospheric Administration (NOAA) on the impact uncertainties in northeast energy weather forecasts. The study demonstrated the cost of seabreeze error on transmission and distribution. The impact of climate scale events were also presented along with energy demand implications. It was suggested that energy planners should incorporate climate change parameters into planning, and that models should include probability distribution forecasts and ensemble forecasting methods that incorporate microclimate estimates. It was also suggested that seabreeze, lake effect, fog, afternoon thunderstorms and frontal passage should be incorporated into forecasts. tabs., figs

  8. Energy models for generation planning and midterm operation of hydrothermal power systems

    Energy Technology Data Exchange (ETDEWEB)

    Amthauer, E

    1981-01-01

    The aims of generation planning and midterm operation of a power system are reliable and economical load coverage at any moment. For solving some of the planning tasks, it is advantageous to use energy models, if a large amount of power is installed in hydro-storage plants. Energy models apply the probability of load coverage in a given period as a quantitative measure for a power system's reliability provided the availability of the transmission network is given. Reliability may be influenced by installing new plants (longterm) or by committing the existing plants in a particular fashion. An evaluation of these activities makes it possible to determine decisions which optimize a given object function. In this thesis, energy models for the Swiss hydrothermal power system are derived and tested by simulation. For this utility, energy supply during the emptying period of the storage plants in winter is of special interest. Therefore, the criteria for generation planning are derived by analysing the distribution functions of future energy balances in winter periods. The committment of the existing plants and energy exchange with other utilities in a straight following winter period are planned by means of a sequential decision process. It is shown how strategies for these planning tasks are found with the models. Those model parameters, having the highest influence on reliable and economical load coverage are extracted by means of sensitivity analysis.

  9. Implementation plan for WRAP Module 1 operational readiness review

    International Nuclear Information System (INIS)

    Irons, L.G.

    1994-01-01

    The Waste Receiving and Processing Module 1 (WRAP 1) will be used to receive, sample, treat, and ship contact-handled (CH) transuranic (TRU), low-level waste (LLW), and low-level mixed waste (LLMW) to storage and disposal sites both on the Hanford site and off-site. The primary mission of WRAP 1 is to characterize and certify CH waste in 55-gallon and 85-gallon drums; and its secondary function is to certify CH waste standard waste boxes (SWB) and boxes of similar size for disposal. The WRAP 1 will provide the capability for examination (including x-ray, visual, and contents sampling), limited treatment, repackaging, and certification of CH suspect-TRU waste in 55-gallon drums retrieved from storage, as well as newly generated CH LLW and CH TRU waste drums. The WRAP 1 will also provide examination (X-ray and visual only) and certification of CH LLW and CH TRU waste in small boxes. The decision to perform an Operational Readiness Review (ORR) was made in accordance with WHC-CM-5-34, Solid Waste Disposal Operations Administration, Section 1.4, Operational Readiness Activities. The ORR will ensure plant and equipment readiness, management and personnel readiness, and management programs readiness for the initial startup of the facility. This implementation plan is provided for defining the conduct of the WHC ORR

  10. Implementing Strategic Planning Capabilities Within the Mars Relay Operations Service

    Science.gov (United States)

    Hy, Franklin; Gladden, Roy; Allard, Dan; Wallick, Michael

    2011-01-01

    Since the Mars Exploration Rovers (MER), Spirit and Opportunity, began their travels across the Martian surface in January of 2004, orbiting spacecraft such as the Mars 2001 Odyssey orbiter have relayed the majority of their collected scientific and operational data to and from Earth. From the beginning of those missions, it was evident that using orbiters to relay data to and from the surface of Mars was a vastly more efficient communications strategy in terms of power consumption and bandwidth compared to direct-to-Earth means. However, the coordination between the various spacecraft, which are largely managed independently and on differing commanding timelines, has always proven to be a challenge. Until recently, the ground operators of all these spacecraft have coordinated the movement of data through this network using a collection of ad hoc human interfaces and various, independent software tools. The Mars Relay Operations Service (MaROS) has been developed to manage the evolving needs of the Mars relay network, and specifically to standardize and integrate the relay planning and coordination data into a centralized infrastructure. This paper explores the journey of developing the MaROS system, from inception to delivery and acceptance by the Mars mission users.

  11. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Energy Technology Data Exchange (ETDEWEB)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  12. Method and apparatus for model construction within orthopaedic and traumatological operation planning

    International Nuclear Information System (INIS)

    Brix, F.; Hebbinghaus, D.

    1985-01-01

    Orthopaedic and traumatological surgeons are increasingly faced with surgical problems which require an unusual amount of planning. Endoprothetic measures concerning very small joints or posttraumatic conditions will illustrate the underlying idea. The same applies to constitutionally false positions which are to be corrected, or to plastic operations following, for instance, tumour resection. Planning means and methods available to date do not suffice for meeting these problematic situations as a rule. Thus, survey radiographs in two planes, tomograms, distance and spot-film radiograms will supply no picture true to scale and but an incomplete three-dimensional image. It is quite obvious that surgical strategy should be determined by means of a model true to scale, in a ''dress rehearsal'', so to speak. (orig./WU) [de

  13. The Integration of Extended Supply Chain with Sales and Operation Planning: A Conceptual Framework

    Directory of Open Access Journals (Sweden)

    Md. Rokonuzzaman

    2018-03-01

    Full Text Available This research is an effort to present the emergence of ways to enable marketers to attain high sensitivity and visibility in the supply chain network. It also aims to facilitate better multi-criteria decisions throughout the extended supply chain. It is a qualitative study considering 31 published research articles related to supply chain integration, sales and operation planning, and the use of information systems. With a focus on narrative data, a purposive sampling technique was used to select the papers for review and to produce the results of this study. The findings of this research indicate that the sales and operation planning (S&OP processes and the key operations in the supply chain network need to be fully integrated. The findings also indicate that information system resources are the key enabler of S&OP and supply chain integration. To be specific, this research is an exercise in theorizing a conceptual framework for optimally confronting the emerging challenges and opportunities regarding an extended supply chain and is intended to bring the proficiency of multi-criteria decisions and actions in the entire supply chain network.

  14. PMU Frequency Data Processing for A Planned Islanding Operation in Bornholm

    DEFF Research Database (Denmark)

    (PMU) system in Bornholm during the planned islanding operation first, as it has high time resolution and it is synchronized to Global Position System (GPS). However, there were some problems with the PMU system during the islanding period, which made the data not as complete as expected. This paper...... describes the problems and provides proposals for a data processing procedure to ensure that the improved frequency data are acceptable for statistics analysis. The proposed data processing procedure is described and evaluated. Furthermore, this paper provides a reference for future PMU data acquisition...... and processing. Individually, section I in the paper generally describes the background for islanding operation and the Bornholm system. Section II introduces the installed PMU measurement system, followed by section III, which describes the PMU original frequency data, the problems during the acquisition...

  15. Integrated vehicle-based safety systems (IVBSS) : light vehicle platform field operational test data analysis plan.

    Science.gov (United States)

    2009-12-22

    This document presents the University of Michigan Transportation Research Institutes plan to : perform analysis of data collected from the light vehicle platform field operational test of the : Integrated Vehicle-Based Safety Systems (IVBSS) progr...

  16. Integrated vehicle-based safety systems (IVBSS) : heavy truck platform field operational test data analysis plan.

    Science.gov (United States)

    2009-11-23

    This document presents the University of Michigan Transportation Research Institutes plan to perform : analysis of data collected from the heavy truck platform field operational test of the Integrated Vehicle- : Based Safety Systems (IVBSS) progra...

  17. Computer-aided dispatch--traffic management center field operational test final detailed test plan : WSDOT deployment

    Science.gov (United States)

    2003-10-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...

  18. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  19. Development, operating experience and future plan of ABWR in Japan

    International Nuclear Information System (INIS)

    Ujihara, N.

    2001-01-01

    construction at Hamaoka unit No. 5, Shika unit No. 2, and in plan at Ohma unit No. 1, Shimane unit No. 3. TEPCO is now progressing cost reduction of ABWR with other Japanese utilities. The most significant point is standardization. And we also plan to adopt some design improvements. By using these measures, TEPCO intends a 30% cost reduction of our next ABWR plants, compared with Kashiwazaki-Kariwa No. 6 and 7 of ABWR first plant. We would like to further develop ABWR for moreover cost reduction. And we start to develop ABWR-II as a large-scale (1700 MW(e)) next generation reactor with the aim to commence plant operation in the late 2010s. (author)

  20. 'Blocked area' of a citizens' action group in operating plan permit accoding to Mining Law

    Energy Technology Data Exchange (ETDEWEB)

    1982-05-26

    On the question as to whether a citizen's action group, organized in the form of a registered club, has the right to file suit as defined by paragraph 2 of sect. 42 of the rules of administrative courts, in case they bring forward that their right to the reforestation of an estate, ensured by easement, will be affected by a skeleton operating plan permit issued under the mining law. Since the protection of the recreational function of forests is a task the safeguarding of which is solely assigned to bodies of public administration, anyone who has a real right may not claim neighbourly protection under public law in so far. On the relationship between operating plan approval, procedures are according to mining laws and the licensing procedures concerning construction permits.

  1. Pilot-scale treatability test plan for the 100-HR-3 operable unit

    International Nuclear Information System (INIS)

    1994-08-01

    This document presents the treatability test plan for pilot-scale pump-and-treat testing at the 100-HR-3 Operable Unit. The test will be conducted in fulfillment of interim Milestone M-15-06E to begin pilot-scale pump-and-treat operations by August 1994. The scope of the test was determined based on the results of lab/bench-scale tests (WHC 1993a) conducted in fulfillment of Milestone M-15-06B. These milestones were established per agreement between the U.S. Department of Energy (DOE), the Washington State Department of Ecology and the U.S. Environmental Protection Agency (EPA), and documented on Hanford Federal of Ecology Facility Agreement and Consent Order Change Control Form M-15-93-02. This test plan discusses a pilot-scale pump-and-treat test for the chromium plume associated with the D Reactor portion of the 100-HR-3 Operable Unit. Data will be collected during the pilot test to assess the effectiveness, operating parameters, and resource needs of the ion exchange (IX) pump-and-treat system. The test will provide information to assess the ability to remove contaminants by extracting groundwater from wells and treating extracted groundwater using IX. Bench-scale tests were conducted previously in which chromium VI was identified as the primary contaminant of concern in the 100-D reactor plume. The DOWEX 21K trademark resin was recommended for pilot-scale testing of an IX pump-and-treat system. The bench-scale test demonstrated that the system could remove chromium VI from groundwater to concentrations less than 50 ppb. The test also identified process parameters to monitor during pilot-scale testing. Water will be re-injected into the plume using wells outside the zone of influence and upgradient of the extraction well

  2. A web-based remote radiation treatment planning system using the remote desktop function of a computer operating system: a preliminary report.

    Science.gov (United States)

    Suzuki, Keishiro; Hirasawa, Yukinori; Yaegashi, Yuji; Miyamoto, Hideki; Shirato, Hiroki

    2009-01-01

    We developed a web-based, remote radiation treatment planning system which allowed staff at an affiliated hospital to obtain support from a fully staffed central institution. Network security was based on a firewall and a virtual private network (VPN). Client computers were installed at a cancer centre, at a university hospital and at a staff home. We remotely operated the treatment planning computer using the Remote Desktop function built in to the Windows operating system. Except for the initial setup of the VPN router, no special knowledge was needed to operate the remote radiation treatment planning system. There was a time lag that seemed to depend on the volume of data traffic on the Internet, but it did not affect smooth operation. The initial cost and running cost of the system were reasonable.

  3. Assessment of Scheduling and Plan Execution of Apollo 14 Lunar Surface Operations

    Science.gov (United States)

    Marquez, Jessica J.

    2010-01-01

    Although over forty years have passed since first landing on the Moon, there is not yet a comprehensive, quantitative assessment of Apollo extravehicular activities (EVAs). Quantitatively evaluating lunar EVAs will provide a better understanding of the challenges involved with surface operations. This first evaluation of a surface EVA centers on comparing the planned and the as-ran timeline, specifically collecting data on discrepancies between durations that were estimated versus executed. Differences were summarized by task categories in order to gain insight as to the type of surface operation activities that were most challenging. One Apollo 14 EVA was assessed utilizing the described methodology. Selected metrics and task categorizations were effective, and limitations to this process were identified.

  4. Operations research for resource planning and -use in radiotherapy: a literature review

    OpenAIRE

    Vieira, Bruno; Hans, Erwin W.; van Vliet-Vroegindeweij, Corine; van de Kamer, Jeroen; van Harten, Wim

    2016-01-01

    Background The delivery of radiotherapy (RT) involves the use of rather expensive resources and multi-disciplinary staff. As the number of cancer patients receiving RT increases, timely delivery becomes increasingly difficult due to the complexities related to, among others, variable patient inflow, complex patient routing, and the joint planning of multiple resources. Operations research (OR) methods have been successfully applied to solve many logistics problems through the development of a...

  5. Planned versus actual outcomes as a result of animal feeding operation decisions for managing phosphorus.

    Science.gov (United States)

    Cabot, Perry E; Nowak, Pete

    2005-01-01

    The paper explores how decisions made on animal feeding operations (AFOs) influence the management of manure and phosphorus. Variability among these decisions from operation to operation and from field to field can influence the validity of nutrient loss risk assessments. These assessments are based on assumptions that the decision outcomes regarding manure distribution will occur as they are planned. The discrepancy between planned versus actual outcomes in phosphorus management was explored on nine AFOs managing a contiguous set of 210 fields in south-central Wisconsin. A total of 2611 soil samples were collected and multiple interviews conducted to assign phosphorus index (PI) ratings to the fields. Spearman's rank correlation coefficients (r(S)) indicated that PI ratings were less sensitive to soil test phosphorus (STP) levels (r(S) = 0.378), universal soil loss equation (USLE) (r(S) = 0.261), ratings for chemical fertilizer application (r(S) = 0.185), and runoff class (r(S) = -0.089), and more sensitive to ratings for manure application (r(S) = 0.854). One-way ANOVA indicated that mean field STP levels were more homogenous than field PI ratings between AFOs. Kolmogorov-Smirnov (K-S) tests displayed several nonsignificant comparisons for cumulative distribution functions, S(x), of mean STP levels on AFO fields. On the other hand, the K-S tests of S(x) for PI ratings indicated that the majority of these S(x) functions were significantly different between AFOs at or greater than the 0.05 significance level. Interviews suggested multiple reasons for divergence between planned and actual outcomes in managing phosphorus, and that this divergence arises at the strategic, tactical, and operational levels of decision-making.

  6. Computer-aided dispatch--traffic management center field operational test final test plans : state of Utah

    Science.gov (United States)

    2004-01-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : state of Utah". This document defines the objective, approach, an...

  7. The operation of accelerators as entrusted business and our company's future plans concerning this tie-up

    International Nuclear Information System (INIS)

    Satoh, Y.; Tanaka, M.

    2004-01-01

    Research Institutes have entrusted the operation of large-scale accelerators to private enterprise in Japan. Research Institutes expect private enterprise to operate and maintain accelerators in a stable condition. With the use of highly advanced accelerators and the diversification of the research to which they are applied, operators of accelerators have come to be considered as supporters of research and are expected to understand the associated highly advanced technologies. In this paper, we are going to consider the present operation of accelerators and discuss our company's future plans concerning this business tie-up. (author)

  8. Public Participation Plan for Waste Area Group 7 Operable Unit 7-13/14 at the Idaho National Laboratory Site

    International Nuclear Information System (INIS)

    B. G. Meagher

    2007-01-01

    This Public Participation Plan outlines activities being planned to: (1) brief the public on results of the remedial investigation and feasibility study, (2) discuss the proposed plan for remediation of Operable Unit 7-13/14 with the public, and (3) encourage public participation in the decision-making process. Operable Unit 7-13/14 is the Comprehensive Remedial Investigation/Feasibility Study for Waste Area Group 7. Analysis focuses on the Subsurface Disposal Area (SDA) within the Radioactive Waste Management Complex at the Idaho National Laboratory (Site). This plan, a supplement to the Idaho National Laboratory Community Relations Plan (DOE-ID 2004), will be updated as necessary. The U.S. Department of Energy (DOE), Idaho Department of Environmental Quality (DEQ), and U.S. Environmental Protection Agency (EPA) will participate in the public involvement activities outlined in this plan. Collectively, DOE, DEQ, and EPA are referred to as the Agencies. Because history has shown that implementing the minimum required public involvement activities is not sufficient for high-visibility cleanup projects, this plan outlines additional opportunities the Agencies are providing to ensure that the public's information needs are met and that the Agencies can use the public's input for decisions regarding remediation activities

  9. Improving operational effectiveness of tactical master plans for emergency and elective patients under stochastic demand and capacitated resources

    NARCIS (Netherlands)

    Adan, I.J.B.F.; Bekkers, J.A.; Dellaert, N.P.; Jeunet, J.; Vissers, J.M.H.

    2009-01-01

    This paper develops a two-stage planning procedure for master planning of elective and emergency patients while allocating at best the available hospital resources. Four types of resources are considered: operating theatre, beds in the medium and in the intensive care units, and nursing hours in the

  10. Improving operational effectiveness of tactical master plans for emergency and elective patients under stochastic demand and capacitated resources

    NARCIS (Netherlands)

    Adan, I.J.B.F.; Bekkers, J.A.; Dellaert, N.P.; Jeunet, J.; Vissers, Jan

    2011-01-01

    This paper develops a two-stage planning procedure for master planning of elective and emergency patients while allocating at best the available hospital resources. Four types of resources are considered: operating theatre, beds in the medium and in the intensive care units, and nursing hours in the

  11. SU-F-T-44: A Comparison of the Pre-Plan, Intra-Operative Plan, and Post-Implant Dosimetry for a Prostate Implant Case Using Prefabricated Linear Polymer-Encapsulated Pd-103

    International Nuclear Information System (INIS)

    Sheu, R; Powers, A; McGee, H; Stock, R; Lo, Y

    2016-01-01

    Purpose: To investigate the reproducibility and limitations of Pd-103 prostate brachytherapy using fixed length linear sources (CivaString). Methods: An LDR prostate brachytherapy case which was preplanned on MR images with prefabricated linear polymer-encapsulated Pd-103 sources (CivaString) was studied and compared with ultrasound based intra-operative planning and CT based post-implant dosimetry. We evaluated the following parameters among the three studies: prostate geometry (volume and cross sectional area), needle position and alignment deviations, and dosimetry parameters (D90). Results: The prostate volumes and axial cross sectional areas at center of prostate were measured as 41.8, 39.3 and 36.8 cc, and 14.9, 14.3, and 11.3 respectively on pre-plan MR, inter-op US, and post-implant CT studies. The deviation of prostate volumes and axial cross sectional areas measured on pre-planning MR and intra-operative US were within 5%. 17 out of 19 pre-planned needles were positioned within 5mm (the template grid size). One needle location was adjusted intra-operatively and another needle was removed due to proximity to urethra. The needle pathways were not always parallel to the trans-rectal probe due to the flexibility of CivaString. The angle of deviation was up to 10 degrees. Two pairs of needles were exchanged to better fit the length of prostate at the time of implant. This resulted in a prostate D90 of 153.8 Gy (124%) and 131.4 Gy (106.7%) for intra-op and PID respectively. Conclusion: Preplanning is a necessary part of implants performed with prefabricated linear polymer sources. However, as is often the case, there were real-time deviations from the pre-plan. Intra-op planning provides the ability conform to anatomy at the time of implant. Therefore, we propose to develop a systematic way to order extra strings of different length to provide the flexibility to perform intra-operative planning with fixed length strands.

  12. SU-F-T-44: A Comparison of the Pre-Plan, Intra-Operative Plan, and Post-Implant Dosimetry for a Prostate Implant Case Using Prefabricated Linear Polymer-Encapsulated Pd-103

    Energy Technology Data Exchange (ETDEWEB)

    Sheu, R; Powers, A; McGee, H; Stock, R; Lo, Y [Mount Sinai Medical Center, New York, NY (United States)

    2016-06-15

    Purpose: To investigate the reproducibility and limitations of Pd-103 prostate brachytherapy using fixed length linear sources (CivaString). Methods: An LDR prostate brachytherapy case which was preplanned on MR images with prefabricated linear polymer-encapsulated Pd-103 sources (CivaString) was studied and compared with ultrasound based intra-operative planning and CT based post-implant dosimetry. We evaluated the following parameters among the three studies: prostate geometry (volume and cross sectional area), needle position and alignment deviations, and dosimetry parameters (D90). Results: The prostate volumes and axial cross sectional areas at center of prostate were measured as 41.8, 39.3 and 36.8 cc, and 14.9, 14.3, and 11.3 respectively on pre-plan MR, inter-op US, and post-implant CT studies. The deviation of prostate volumes and axial cross sectional areas measured on pre-planning MR and intra-operative US were within 5%. 17 out of 19 pre-planned needles were positioned within 5mm (the template grid size). One needle location was adjusted intra-operatively and another needle was removed due to proximity to urethra. The needle pathways were not always parallel to the trans-rectal probe due to the flexibility of CivaString. The angle of deviation was up to 10 degrees. Two pairs of needles were exchanged to better fit the length of prostate at the time of implant. This resulted in a prostate D90 of 153.8 Gy (124%) and 131.4 Gy (106.7%) for intra-op and PID respectively. Conclusion: Preplanning is a necessary part of implants performed with prefabricated linear polymer sources. However, as is often the case, there were real-time deviations from the pre-plan. Intra-op planning provides the ability conform to anatomy at the time of implant. Therefore, we propose to develop a systematic way to order extra strings of different length to provide the flexibility to perform intra-operative planning with fixed length strands.

  13. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  14. The key to successful management of STS operations: An integrated production planning system

    Science.gov (United States)

    Johnson, W. A.; Thomasen, C. T.

    1985-01-01

    Space Transportation System operations managers are being confronted with a unique set of challenges as a result of increasing flight rates, the demand for flight manifest/production schedule flexibility and an emphasis on continued cost reduction. These challenges have created the need for an integrated production planning system that provides managers with the capability to plan, schedule, status and account for an orderly flow of products and services across a large, multi-discipline organization. With increased visibility into the end-to-end production flow for individual and parallel missions in process, managers can assess the integrated impact of changes, identify and measure the interrelationships of resource, schedule, and technical performance requirements and prioritize productivity enhancements.

  15. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    International Nuclear Information System (INIS)

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided

  16. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided.

  17. A hybrid heuristic algorithm for the open-pit-mining operational planning problem.

    OpenAIRE

    Souza, Marcone Jamilson Freitas; Coelho, Igor Machado; Ribas, Sabir; Santos, Haroldo Gambini; Merschmann, Luiz Henrique de Campos

    2010-01-01

    This paper deals with the Open-Pit-Mining Operational Planning problem with dynamic truck allocation. The objective is to optimize mineral extraction in the mines by minimizing the number of mining trucks used to meet production goals and quality requirements. According to the literature, this problem is NPhard, so a heuristic strategy is justified. We present a hybrid algorithm that combines characteristics of two metaheuristics: Greedy Randomized Adaptive Search Procedures and General Varia...

  18. Advanced oxidation technologies for chemical demilitarization

    Energy Technology Data Exchange (ETDEWEB)

    Rosocha, L.A.; Korzekwa, R.A.; Monagle, M.; Coogan, J.J.; Tennant, R.A.; Brown, L.F.; Currier, R.P.

    1996-12-31

    This is the final report of a one-year, Laboratory-Directed Research and Development (LDRD) project at the Los Alamos National Laboratory. The main project objective was to establish a technical basis for future program development in the area of chemical warfare agent destruction using a Los Alamos-developed advanced oxidation process: a two-stage device consisting of thermal packed-bed reactor (PBR) and a nonthermal plasma (NTP) reactor. Various compounds were evaluated as potential surrogates for chemical warfare (CW) agents. Representative effluent mass balances were projected for future comparisons with incinerators. The design and construction of lab-scale PBR/NTP reactors (consisting of a liquid injection and metering system, electric furnace, condensers, chemical traps, plasma reactors, power supplies, and chemical diagnostics) has been completed. This equipment, the experience gained from chemical-processing experiments, process modeling, and an initial demonstration of the feasibility of closed-loop operation, have provided a technical basis for further demonstrations and program development efforts.

  19. Automated and connected vehicle (AV/CV) test bed to improve transit, bicycle, and pedestrian safety : concept of operations plan.

    Science.gov (United States)

    2017-02-01

    This document presents the Concept of Operations (ConOps) Plan for the Automated and Connected Vehicle (AV/CV) Test Bed to Improve Transit, Bicycle, and Pedestrian Safety. As illustrated in Figure 1, the plan presents the overarching vision and goals...

  20. Reliability analysis and risk-based methods for planning of operation & maintenance of offshore wind turbines

    DEFF Research Database (Denmark)

    Sørensen, John Dalsgaard

    2017-01-01

    for extreme and fatigue limit states are presented. Operation & Maintenance planning often follows corrective and preventive strategies based on information from condition monitoring and structural health monitoring systems. A reliability- and risk-based approach is presented where a life-cycle approach...

  1. RCRA facility investigation/corrective measures study work plan for the 100-HR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-3 operable unit. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Source operable units include facilities and unplanned release sites that are potential sources of contamination. Separate work plans have been initiated for the 100-DR-1 (DOE-RL 1992a) and 100-HR-1 (DOE-RL 1992b) source operable units

  2. MOVES: A knowledge-based system for maintenance planning for motor-operated valves

    International Nuclear Information System (INIS)

    Winter, M.

    1987-01-01

    Over the past several years, knowledge-based expert systems have emerged as an important part of the general research area known as artificial intelligence. This paper describes a cooperative effort between faculty members at Iowa State University and engineers at the Duane Arnold Energy Center [a 545-MW(electric) boiling water reactor operated by Iowa Electric Light and Power Company] to explore the development of an advisory system for valve maintenance planning. This knowledge-based program, known as Motor-Operated Valves Expert System (MOVES), has a data base that currently includes safety-related motor-operated valves (∼117 valves). Valve maintenance was selected as the subject for the expert system because of the importance of valves in nuclear plant and their impact of plant availability. MOVES is being developed using the microcomputer-(IBM compatible) based expert system tool INSIGHT2+. The authors have found that the project benefits both the university and the utility

  3. Applying analysis tools in planning for operations : case study #4 -- application of microsimulation in combination with travel demand models

    Science.gov (United States)

    2009-09-01

    More and more, transportation system operators are seeing the benefits of strengthening links between planning and operations. A critical element in improving transportation decision-making and the effectiveness of transportation systems related to o...

  4. Orthognathic positioning system: intraoperative system to transfer virtual surgical plan to operating field during orthognathic surgery.

    Science.gov (United States)

    Polley, John W; Figueroa, Alvaro A

    2013-05-01

    To introduce the concept and use of an occlusal-based "orthognathic positioning system" (OPS) to be used during orthognathic surgery. The OPS consists of intraoperative occlusal-based devices that transfer virtual surgical planning to the operating field for repositioning of the osteotomized dentoskeletal segments. The system uses detachable guides connected to an occlusal splint. An initial drilling guide is used to establish stable references or landmarks. These are drilled on the bone that will not be repositioned adjacent to the osteotomy line. After mobilization of the skeletal segment, a final positioning guide, referenced to the drilled landmarks, is used to transfer the skeletal segment according to the virtual surgical planning. The OPS is digitally designed using 3-dimensional computer-aided design/computer-aided manufacturing technology and manufactured with stereolithographic techniques. Virtual surgical planning has improved the preoperative assessment and, in conjunction with the OPS, the execution of orthognathic surgery. The OPS has the possibility to eliminate the inaccuracies commonly associated with traditional orthognathic surgery planning and to simplify the execution by eliminating surgical steps such as intraoperative measuring, determining the condylar position, the use of bulky intermediate splints, and the use of intermaxillary wire fixation. The OPS attempts precise translation of the virtual plan to the operating field, bridging the gap between virtual and actual surgery. Copyright © 2013 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.

  5. Mars 2001 Lander Mission: Measurement Synergy Through Coordinated Operations Planning And Implementation

    Science.gov (United States)

    Arvidson, R.; Bell, J. F., III; Kaplan, D.; Marshall, J.; Mishkin, A.; Saunders, S.; Smith, P.; Squyres, S.

    1999-09-01

    The 2001 Mars Surveyor Program Mission includes an orbiter with a gamma ray spectrometer and a multispectral thermal imager, and a lander with an extensive set of instrumentation, a robotic arm, and the Marie Curie Rover. The Mars 2001 Science Operations Working Group (SOWG) is a subgroup of the Project Science Group that has been formed to provide coordinated planning and implementation of scientific observations, particularly for the landed portion of the mission. The SOWG will be responsible for delivery of a science plan and, during operations, generation and delivery of conflict-free sequences. This group will also develop an archive plan that is compliant with Planetary Data System (PDS) standards, and will oversee generation, validation, and delivery of integrated archives to the PDS. In this report we cover one element of the SOWG planning activities, the development of a plan that maximizes the scientific return from lander-based observations by treating the instrument packages as an integrated payload. Scientific objectives for the lander mission have been defined. They include observations focused on determining the bedrock geology of the site through analyses of rocks and also local materials found in the soils, and the surficial geology of the site, including windblown deposits and the nature and history of formation of indurated sediments such as duricrust. Of particular interest is the identification and quantification of processes related to early warm, wet conditions and the presence of hydrologic or hydrothermal cycles. Determining the nature and origin of duricrust and associated salts is -very important in this regard. Specifically, did these deposits form in the vadose zone as pore water evaporated from soils or did they form by other processes, such as deposition of volcanic aerosols? Basic information needed to address these questions includes the morphology, topography, and geologic context of landforms and materials exposed at the site

  6. Mars 2001 Lander Mission: Measurement Synergy Through Coordinated Operations Planning And Implementation

    Science.gov (United States)

    Arvidson, R.; Bell, J. F., III; Kaplan, D.; Marshall, J.; Mishkin, A.; Saunders, S.; Smith, P.; Squyres, S.

    1999-01-01

    The 2001 Mars Surveyor Program Mission includes an orbiter with a gamma ray spectrometer and a multispectral thermal imager, and a lander with an extensive set of instrumentation, a robotic arm, and the Marie Curie Rover. The Mars 2001 Science Operations Working Group (SOWG) is a subgroup of the Project Science Group that has been formed to provide coordinated planning and implementation of scientific observations, particularly for the landed portion of the mission. The SOWG will be responsible for delivery of a science plan and, during operations, generation and delivery of conflict-free sequences. This group will also develop an archive plan that is compliant with Planetary Data System (PDS) standards, and will oversee generation, validation, and delivery of integrated archives to the PDS. In this report we cover one element of the SOWG planning activities, the development of a plan that maximizes the scientific return from lander-based observations by treating the instrument packages as an integrated payload. Scientific objectives for the lander mission have been defined. They include observations focused on determining the bedrock geology of the site through analyses of rocks and also local materials found in the soils, and the surficial geology of the site, including windblown deposits and the nature and history of formation of indurated sediments such as duricrust. Of particular interest is the identification and quantification of processes related to early warm, wet conditions and the presence of hydrologic or hydrothermal cycles. Determining the nature and origin of duricrust and associated salts is -very important in this regard. Specifically, did these deposits form in the vadose zone as pore water evaporated from soils or did they form by other processes, such as deposition of volcanic aerosols? Basic information needed to address these questions includes the morphology, topography, and geologic context of landforms and materials exposed at the site

  7. Industrial Fuel Gas Demonstration Plant Program. Demonstration plant operation plan (Deliverable No. 38)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    The Demo Plant Operating Plan is composed of the following sequence of events starting with the training or personnel, familiarizing of the personnel with the plant and completing the long-term run in the following sequences: inspection during construction, plant completion, shakedown of equipment, process unit startup, shakedown of process units, variable run operation and a turnaround. During the construction period, technical personnel from DRC, MLGW and IGT will be at the plant site becoming familiar with the equipment, its installation and all of the auxiliaries so that on completion of construction they will be well grounded on the plant detail and its configuration. At the same time the supervisory operating personnel will have hands on training the gasifier operation at the IGT pilot plant to develop a field for gasifier operation. As a plant sections are completed, they will be checked out in accordance with the contractor and operator (client) procedure as outlined. Subsequent to this, various vendor designs and furnished equipment will be checked out operating-wise and a performance test run if feasible. The actual startup of the plant will be subsequential with the support areas as utilities, coal handling and waste treatment being placed in operation first. Subsequent to this the process units will be placed in operation starting from the rear of the process train and working forward. Thus the downstream units will be operating before the reactor is run on coal. The reactor will be checked out on coke operation.

  8. An environment for operation planning of electrical energy distribution systems; Um ambiente para planejamento da operacao de sistemas de distribuicao de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Hashimoto, Kleber

    1997-07-01

    The aim of operation planning of electrical energy distribution systems is to define a group of interventions in the distribution network in a way to reach a global optimization. Both normal operation and emergency conditions are considered including scheduled interventions in the network. Under normal conditions, some aspects as voltage drop and loss minimization, for example, are considered; under emergency conditions, the minimization of non-distributed energy and interruption time are taken into account. This proposes the development of a computer environment for operation planning studies. The design and implementation of a specific operation planning database, based on a relational database model, was carried out so that new information modules could be easily included. A statistical approach has been applied to the load model including consumption habits and seasonal information, for each consumer category. A group of operation planning functions is proposed, which includes simulation modules responsible for system analysis. These functions and the database should be designed together. The developed computer environment allows the inclusion of new functions, due to the standardized query language used to access the database. Two functions have been implemented for illustration. The development of the proposed environment constitutes a step towards an open operation planning system, an integration with other information systems and an easy-to-use system based on graphical interface. (author)

  9. Pre-operative planning for mandibular reconstruction - A full digital planning workflow resulting in a patient specific reconstruction

    Science.gov (United States)

    2011-01-01

    Objectives Reconstruction of large mandiblular defects following ablative oncologic surgery could be done by using vascularized bone transfer or, more often, primarily with simultaneous or delayed bone grafting, using load bearing reconstruction plates. Bending of these reconstruction plates is typically directed along the outer contour of the original mandible. Simultaneously or in a second operation vascularized or non-vascularized bone is fixed to the reconstruction plate. However, the prosthodontic-driven backward planning to ease bony reconstruction of the mandible in terms of dental rehabilitation using implant-retained overdentures might be an eligible solution. The purpose of this work was to develop, establish and clinically evaluate a novel 3D planning procedure for mandibular reconstruction. Materials and methods Three patients with tumors involving the mandible, which included squamous cell carcinoma in the floor of the mouth and keratocystic odontogenic tumor, were treated surgically by hemimandibulectomy. Results In primary alloplastic mandible reconstruction, shape and size of the reconstruction plate could be predefined and prebent prior to surgery. Clinical relevance This study provides modern treatment strategies for mandibular reconstruction. PMID:21968330

  10. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit; FINAL

    International Nuclear Information System (INIS)

    Bradley, J.

    2002-01-01

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process

  11. Approach and plan for cleanup actions in the 100-FR-2 operable unit of the Hanford Site, Revision 0

    International Nuclear Information System (INIS)

    1995-06-01

    A new administrative approach is being used to reach a cleanup decision for the 100-FR-2 Operable Unit. The unit, located at the 100-F Area, contains solid waste sites and is one of the remaining operable units scheduled for characterization and cleanup in the 100 Area. This Focus Package (1) describes the new approach and activities needed to reach a decision on cleanup actions for the 100-FR-2 Operable Unit and (2) invites public participation into the planning process. The previous approach included the production of a Work Plan, a Limited Field Investigation Report, a Qualitative Risk Assessment, a Focused Feasibility Study, and a Proposed Plan, all culminating in an interim action Record of Decision. Information gathered to date on other operable units allows the analgous site approach to be used on the 100-FR-2 Operable Unit, and therefore, a reduction in documentation preparation. The U.S. Environmental Protection Agency, Washington State Department of Ecology, and the U.S. Department of Energy (Tri-Party Agreement) believe that the new approach will save time and funding. In the new approach, the Work Plan has been condensed into this 12 page Focus Package. The Focus Package includes a summary of 100-F Area information, a list of waste sites in the 100-FR-2 Operable Unit, a summary of proposed work, and a schedule. The new approach will also combine the Limited Field Investigation and Qualitative Risk Assessment reports into the Focused Feasibility Study. The Focused Feasibility Study will analyze methods and costs to clean up waste sites. Consolidating the documents should reduce the time to complete the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process by 16 months, compared to the previous approach

  12. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington. Draft A

    International Nuclear Information System (INIS)

    1994-09-01

    This proposed plan introduces the interim remedial measures for addressing contaminated soil at the 100-HR-1 Operable Unit, located at the Hanford Site. In addition, this plan includes a summary of other alternatives analyzed and considered for the 100-HR-1 Operable Unit. The EPA, DOE, and Washington State Dept. of Ecology believe that a combination of removal, treatment, and disposal technologies, where appropriate, would significantly reduce the potential threats to human health and the environment at the 100-HR-1 Operable Unit high-priority waste sites. The remedial actions described in this proposed plan are designed to minimize human health and ecological risks and ensure that additional contaminants originating from these waste sites are not transported to the groundwater. The 100-HR-1 Operable Unit contains the retention basin for the H reactor cooling system, process effluent trenches, the Pluto crib which received an estimated 260 gallons of radioactive liquid waste, process effluent pipelines, and solid waste sites used for the burial of decontaminated and decommissioned equipment from other facilities. Potential health threats would be from the isotopes of cesium, cobalt, europium, plutonium, and strontium, and from chromium, arsenic, lead, and chysene

  13. 26 CFR 1.401(a)(4)-5 - Plan amendments and plan terminations.

    Science.gov (United States)

    2010-04-01

    ... employer decides to wind up its business. In the process of ceasing operations, but at a time when the plan.... (4) Operational restrictions on certain money purchase pension plans. A money purchase pension plan... 26 Internal Revenue 5 2010-04-01 2010-04-01 false Plan amendments and plan terminations. 1.401(a...

  14. A Swedish co-operation programme for radiological emergency planning activities in the Baltic Sea region

    International Nuclear Information System (INIS)

    Petersson, B.

    1998-01-01

    Short overview of the Swedish cooperation projects with Baltic countries in the field of radiological emergency preparedness is presented. Cooperation programme is going since 1993 and is divided into following sections: sub-projects on planning, training and exercises, sub-projects on measurement strategies, including early warning systems, sub-project on information to the public and the media, sub-projects on review of the Ignalina NPP on-site emergency preparedness and planning of on-site rescue operations. Total budget amount allocated for these projects is 9 million Swedish crowns

  15. Is science the driving force in the operation of environmental regimes? : A case study of the Mediterranean Action Plan

    NARCIS (Netherlands)

    Frantzi, Sofia; Lovett, Jonathan Cranidge

    2008-01-01

    This study examines the role of science in the operation of environmental regimes using the Barcelona Convention/Mediterranean Action Plan (MAP) as a case study. The ‘epistemic communities’ theory suggests that emergence of the Mediterranean Action Plan was largely driven by scientific experts. In

  16. Is science the driving force in the operation of environmental regimes? A case study of the Mediterranean Action Plan

    NARCIS (Netherlands)

    Frantzi, Sofia; Lovett, Jonathan Cranidge

    2008-01-01

    This study examines the role of science in the operation of environmental regimes using the Barcelona Convention/Mediterranean Action Plan (MAP) as a case study. The ‘epistemic communities’ theory suggests that emergence of the Mediterranean Action Plan was largely driven by scientific experts. In

  17. Is science the driving force in the operation of environmental regimes? A case study of the Mediterranean Action Plan

    NARCIS (Netherlands)

    Frantzi, S.; Lovett, J.C.

    2008-01-01

    This study examines the role of science in the operation of environmental regimes using the Barcelona Convention/Mediterranean Action Plan (MAP) as a case study. The 'epistemic communities' theory suggests that emergence of the Mediterranean Action Plan was largely driven by scientific experts. In

  18. A mixed integer linear programming model for operational planning of a biodiesel supply chain network from used cooking oil

    Science.gov (United States)

    Jonrinaldi, Hadiguna, Rika Ampuh; Salastino, Rades

    2017-11-01

    Environmental consciousness has paid many attention nowadays. It is not only about how to recycle, remanufacture or reuse used end products but it is also how to optimize the operations of the reverse system. A previous research has proposed a design of reverse supply chain of biodiesel network from used cooking oil. However, the research focused on the design of the supply chain strategy not the operations of the supply chain. It only decided how to design the structure of the supply chain in the next few years, and the process of each stage will be conducted in the supply chain system in general. The supply chain system has not considered operational policies to be conducted by the companies in the supply chain. Companies need a policy for each stage of the supply chain operations to be conducted so as to produce the optimal supply chain system, including how to use all the resources that have been designed in order to achieve the objectives of the supply chain system. Therefore, this paper proposes a model to optimize the operational planning of a biodiesel supply chain network from used cooking oil. A mixed integer linear programming is developed to model the operational planning of biodiesel supply chain in order to minimize the total operational cost of the supply chain. Based on the implementation of the model developed, the total operational cost of the biodiesel supply chain incurred by the system is less than the total operational cost of supply chain based on the previous research during seven days of operational planning about amount of 2,743,470.00 or 0.186%. Production costs contributed to 74.6 % of total operational cost and the cost of purchasing the used cooking oil contributed to 24.1 % of total operational cost. So, the system should pay more attention to these two aspects as changes in the value of these aspects will cause significant effects to the change in the total operational cost of the supply chain.

  19. Virtual Planning, Control, and Machining for a Modular-Based Automated Factory Operation in an Augmented Reality Environment

    Science.gov (United States)

    Pai, Yun Suen; Yap, Hwa Jen; Md Dawal, Siti Zawiah; Ramesh, S.; Phoon, Sin Ye

    2016-01-01

    This study presents a modular-based implementation of augmented reality to provide an immersive experience in learning or teaching the planning phase, control system, and machining parameters of a fully automated work cell. The architecture of the system consists of three code modules that can operate independently or combined to create a complete system that is able to guide engineers from the layout planning phase to the prototyping of the final product. The layout planning module determines the best possible arrangement in a layout for the placement of various machines, in this case a conveyor belt for transportation, a robot arm for pick-and-place operations, and a computer numerical control milling machine to generate the final prototype. The robotic arm module simulates the pick-and-place operation offline from the conveyor belt to a computer numerical control (CNC) machine utilising collision detection and inverse kinematics. Finally, the CNC module performs virtual machining based on the Uniform Space Decomposition method and axis aligned bounding box collision detection. The conducted case study revealed that given the situation, a semi-circle shaped arrangement is desirable, whereas the pick-and-place system and the final generated G-code produced the highest deviation of 3.83 mm and 5.8 mm respectively. PMID:27271840

  20. Virtual Planning, Control, and Machining for a Modular-Based Automated Factory Operation in an Augmented Reality Environment

    Science.gov (United States)

    Pai, Yun Suen; Yap, Hwa Jen; Md Dawal, Siti Zawiah; Ramesh, S.; Phoon, Sin Ye

    2016-06-01

    This study presents a modular-based implementation of augmented reality to provide an immersive experience in learning or teaching the planning phase, control system, and machining parameters of a fully automated work cell. The architecture of the system consists of three code modules that can operate independently or combined to create a complete system that is able to guide engineers from the layout planning phase to the prototyping of the final product. The layout planning module determines the best possible arrangement in a layout for the placement of various machines, in this case a conveyor belt for transportation, a robot arm for pick-and-place operations, and a computer numerical control milling machine to generate the final prototype. The robotic arm module simulates the pick-and-place operation offline from the conveyor belt to a computer numerical control (CNC) machine utilising collision detection and inverse kinematics. Finally, the CNC module performs virtual machining based on the Uniform Space Decomposition method and axis aligned bounding box collision detection. The conducted case study revealed that given the situation, a semi-circle shaped arrangement is desirable, whereas the pick-and-place system and the final generated G-code produced the highest deviation of 3.83 mm and 5.8 mm respectively.

  1. Virtual Planning, Control, and Machining for a Modular-Based Automated Factory Operation in an Augmented Reality Environment.

    Science.gov (United States)

    Pai, Yun Suen; Yap, Hwa Jen; Md Dawal, Siti Zawiah; Ramesh, S; Phoon, Sin Ye

    2016-06-07

    This study presents a modular-based implementation of augmented reality to provide an immersive experience in learning or teaching the planning phase, control system, and machining parameters of a fully automated work cell. The architecture of the system consists of three code modules that can operate independently or combined to create a complete system that is able to guide engineers from the layout planning phase to the prototyping of the final product. The layout planning module determines the best possible arrangement in a layout for the placement of various machines, in this case a conveyor belt for transportation, a robot arm for pick-and-place operations, and a computer numerical control milling machine to generate the final prototype. The robotic arm module simulates the pick-and-place operation offline from the conveyor belt to a computer numerical control (CNC) machine utilising collision detection and inverse kinematics. Finally, the CNC module performs virtual machining based on the Uniform Space Decomposition method and axis aligned bounding box collision detection. The conducted case study revealed that given the situation, a semi-circle shaped arrangement is desirable, whereas the pick-and-place system and the final generated G-code produced the highest deviation of 3.83 mm and 5.8 mm respectively.

  2. Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Waste Management Plan

    International Nuclear Information System (INIS)

    G. L. Schwendiman

    2006-01-01

    This Waste Management Plan describes waste management and waste minimization activities for Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory. The waste management activities described in this plan support the selected response action presented in the Final Record of Decision for Idaho Nuclear Technology and Engineering Center, Operable Unit 3-13. This plan identifies the waste streams that will be generated during implementation of the remedial action and presents plans for waste minimization, waste management strategies, and waste disposition

  3. Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13

    International Nuclear Information System (INIS)

    Richard P. Wells

    2007-01-01

    This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year

  4. U. S. Atlantic Fleet, Eighth Amphibious Force. Operation Plan Number 2-44

    Science.gov (United States)

    1944-01-01

    distributed with this Operation Order. (c) Panoramic Bench Sketches No. P-l for Boach 259 and No. P~3 for Loach 26l (South) givo viator level...To indicate tank or ID targets. (g) Green Cluster, White Cluster - Lift Artillery fire. Page 32 of 33. ANNEX KENS . GTMFIRS SUPPORT PLAN. TABLE VI...AURORA . SFCP 5 AUX GROUND SPOT - LIVERMORS SFCP 6 AUX GROUND SPOT - LA GLOIRE SFCP 7 AUX GROUND -SPOT ~ TERM- ERIC SFCP 8 AUX GROUND SPOT - ORION-KEAR

  5. SU-F-T-80: A Mobile Application for Intra-Operative Electron Radiotherapy Treatment Planning

    International Nuclear Information System (INIS)

    Williams, C; Crowley, E; Wolfgang, J

    2016-01-01

    Purpose: Intraoperative electron radiotherapy (IORT) poses a unique set of challenges for treatment planning. Planning must be performed in a busy operating room environment over a short timeframe often with little advance knowledge of the treatment depth or applicator size. Furthermore, IORT accelerators can have a large number of possible applicators, requiring extensive databooks that must be searched for the appropriate dosimetric parameters. The goal of this work is to develop a software tool to assist in the planning process that is suited to the challenges faced in the IORT environment. Methods: We developed a mobile application using HTML5 and Javascript that can be deployed to tablet devices suitable for use in the operating room. The user selects the desired treatment parameters cone diameter, bevel angle, and energy (a total of 141 datasets) and desired bolus. The application generates an interactive display that allows the user to dynamically select points on the depth-dose curve and to visualize the shape of the corresponding isodose contours. The user can indicate a prescription isodose line or depth. The software performs a monitor unit calculation and generates a PDF report. Results: We present our application, which is now used routinely in our IORT practice. It has been employed successfully in over 23 cases. The interactivity of the isodose distributions was found to be of particular use to physicians who are less-frequent IORT users, as well as for the education of residents and trainees. Conclusion: This software has served as a useful tool in IORT planning, and demonstrates the need for treatment planning tools that are designed for the specialized challenges encountered in IORT. This software is the subject of a license agreement with the IntraOp Medical Corporation. This software is the subject of a license agreement between Massachusetts General Hospital / Partners Healthcare and the IntraOp Medical Corporation. CLW is consulting on

  6. SU-F-T-80: A Mobile Application for Intra-Operative Electron Radiotherapy Treatment Planning

    Energy Technology Data Exchange (ETDEWEB)

    Williams, C [Brigham and Women’s Hospital & Dana Farber Cancer Institute, Boston, MA (United States); Harvard Medical School, Boston, MA (United States); Crowley, E; Wolfgang, J [Harvard Medical School, Boston, MA (United States); Massachusetts General Hospital, Boston, MA (United States)

    2016-06-15

    Purpose: Intraoperative electron radiotherapy (IORT) poses a unique set of challenges for treatment planning. Planning must be performed in a busy operating room environment over a short timeframe often with little advance knowledge of the treatment depth or applicator size. Furthermore, IORT accelerators can have a large number of possible applicators, requiring extensive databooks that must be searched for the appropriate dosimetric parameters. The goal of this work is to develop a software tool to assist in the planning process that is suited to the challenges faced in the IORT environment. Methods: We developed a mobile application using HTML5 and Javascript that can be deployed to tablet devices suitable for use in the operating room. The user selects the desired treatment parameters cone diameter, bevel angle, and energy (a total of 141 datasets) and desired bolus. The application generates an interactive display that allows the user to dynamically select points on the depth-dose curve and to visualize the shape of the corresponding isodose contours. The user can indicate a prescription isodose line or depth. The software performs a monitor unit calculation and generates a PDF report. Results: We present our application, which is now used routinely in our IORT practice. It has been employed successfully in over 23 cases. The interactivity of the isodose distributions was found to be of particular use to physicians who are less-frequent IORT users, as well as for the education of residents and trainees. Conclusion: This software has served as a useful tool in IORT planning, and demonstrates the need for treatment planning tools that are designed for the specialized challenges encountered in IORT. This software is the subject of a license agreement with the IntraOp Medical Corporation. This software is the subject of a license agreement between Massachusetts General Hospital / Partners Healthcare and the IntraOp Medical Corporation. CLW is consulting on

  7. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  8. Advanced software development workstation: Object-oriented methodologies and applications for flight planning and mission operations

    Science.gov (United States)

    Izygon, Michel

    1993-01-01

    The work accomplished during the past nine months in order to help three different organizations involved in Flight Planning and in Mission Operations systems, to transition to Object-Oriented Technology, by adopting one of the currently most widely used Object-Oriented analysis and Design Methodology is summarized.

  9. A strategic planning approach for operational-environmental tradeoff assessments in terminal areas

    Science.gov (United States)

    Jimenez, Hernando

    This thesis proposes the use of well established statistical analysis techniques, leveraging on recent developments in interactive data visualization capabilities, to quantitatively characterize the interactions, sensitivities, and tradeoffs prevalent in the complex behavior of airport operational and environmental performance. Within the strategic airport planning process, this approach is used in the assessment of airport performance under current/reference conditions, as well as in the evaluation of terminal area solutions under projected demand conditions. More specifically, customized designs of experiments are utilized to guide the intelligent selection and definition of modeling and simulation runs that will yield greater understanding, insight, and information about the inherent systemic complexity of a terminal area, with minimal computational expense. For the research documented in this thesis, a modeling and simulation environment was created featuring three primary components. First, a generator of schedules of operations, based primarily on previous work on aviation demand characterization, whereby growth factors and scheduling adjustment algorithms are applied on appropriate baseline schedules so as to generate notional operational sets representative of consistent future demand conditions. The second component pertains to the modeling and simulation of aircraft operations, defined by a schedule of operations, on the airport surface and within its terminal airspace. This component is a discrete event simulator for multiple queuing models that captures the operational architecture of the entire terminal area along with all the necessary operational logic pertaining to simulated Air Traffic Control (ATC) functions, rules, and standard practices. The third and final component is comprised of legacy aircraft performance, emissions and dispersion, and noise exposure modeling tools, that use the simulation history of aircraft movements to generate estimates

  10. Operation REDWING Commander Task Group 7.3, Operation Plan Number 1-56.

    Science.gov (United States)

    1956-01-24

    Radio Circuit Description SI. Tab B - Radio Frequency Plan 7:: Tab C - Aircraft Radio Frequency List Tab D - Radio Circuit Diagram Appendix 2 - Radio...Frequency Plan C Aircraft Radio Frequency List D Radio Circuit Diagrams 2 - Radio Call Signs and Code ’Words N. ROHI5BE2 E LCDR, U. S. Navy Flag...appendix. TABS: A Radio Circuit Description B Radio Frequency Plan C Aircraft Radio Frequency List D Radio Circuit Diagrams Joint Task Force SEVEN Task

  11. Lagrangian relaxation technique in power systems operation planning: Multipliers updating problem

    Energy Technology Data Exchange (ETDEWEB)

    Ruzic, S. [Electric Power Utility of Serbia, Belgrade (Yugoslavia)

    1995-11-01

    All Lagrangian relaxation based approaches to the power systems operation planning have an important common part: the Lagrangian multipliers correction procedure. It is the subject of this paper. Different approaches presented in the literature are discussed and an original method for the Lagrangian multipliers updating is proposed. The basic idea of this new method is to update Lagrangian multipliers trying to satisfy Khun-Tucker optimality conditions. Instead of the dual function maximization the `distance of optimality function` is defined and minimized. If Khun-Tucker optimality conditions are satisfied the value of this function is in range (-1,0); otherwise the function has a big positive value. This method called `the distance of optimality method` takes into account future changes in planning generations due to the Lagrangian multipliers updating. The influence of changes in a multiplier associated to one system constraint to the satisfaction of some other system requirements is also considered. The numerical efficiency of the proposed method is analyzed and compared with results obtained using the sub-gradient technique. 20 refs, 2 tabs

  12. Project Execution Plan, Waste Management Division, Nevada Operations Office, U.S. Department of Energy, April 2000

    International Nuclear Information System (INIS)

    2000-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy/Nevada Operations Office Waste Management Division and conforms to the requirements contained in the ''Life Cycle Asset Management,'' U.S. Department of Energy Order O430.1A; the Joint Program Office Policy on Project Management in Support of DOE Order O430.1, and the Project Execution and Engineering Management Planning Guide. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the state of Nevada; and traditional project management philosophies such as the development of life cycle costs, schedules, and work scope; identification of roles and responsibilities; and baseline management and controls

  13. Tax Planning for Enterprises

    Institute of Scientific and Technical Information of China (English)

    Fan Weiqing

    2011-01-01

    @@ Tax planning is legal planning activities for tax savings, meaning tax payers make operation plans within the national policy framework and choose operation programs favorable to tax savings.Along with a maturing socialist market economy system in China, tax planning is becoming an integral part of enterprise management and operation.For a better tax planning, enterprises have to fully understand the meaning, get proficient at relevant strategies, and apply these methods to save taxes and realize the maximization of enterprise value while considering the actual situation.

  14. Remedial investigation/feasibility study work plan for the 100-KR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-1 operable unit. The 100-KR-1 source operable unit is one of three source operable units in the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination

  15. Bechtel Hanford, Inc./ERC team health and safety plan Environmental Restoration Disposal Facility operations

    International Nuclear Information System (INIS)

    Turney, S.R.

    1996-02-01

    A comprehensive safety and health program is essential for reducing work-related injuries and illnesses while maintaining a safe and health work environment. This document establishes Bechtel Hanford, Inc. (BHI)/Environmental Restoration Contractor (ERC) team requirements, policies, and procedures and provides preliminary guidance to the Environmental Restoration Disposal Facility (ERDF) subcontractor for use in preparing essential safety and health documents. This health and safety plan (HASP) defines potential safety and health issues associated with operating and maintaining the ERDF. A site-specific HASP shall be developed by the ERDF subcontractor and shall be implemented before operations and maintenance work can proceed. An activity hazard analysis (AHA) shall also be developed to provide procedures to identify, assess, and control hazards or potential incidents associated with specific operations and maintenance activities

  16. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites at the 100-HR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this operable unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that historically received radioactive liquid waste discharges that pose a potential threat to human health and the environment. This proposed plan is being issued by the Washington State Department of Ecology (Ecology), the lead regulatory agency; the US Environmental Protection Agency (EPA), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. Ecology, EPA, and DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Program.'' The proposed plan is intended to be a fact sheet for public review that (1) briefly describes the remedial alternatives analyzed; (2) proposes a preferred alternative; (3) summarizes the information relied upon to recommend the preferred alternative; and (4) provides a basis for an interim action record of decision (ROD). The preferred alternative presented in this proposed plan is removal, treatment (as appropriate), and disposal of contaminated soil and associated structures. Treatment will be conducted if there is cost benefit

  17. Quayside Operations Planning Under Uncertainty

    DEFF Research Database (Denmark)

    Iris, Cagatay; Jin, Jian Gang; Lee, Der-Hong

    The quayside operation problem is one of the key components in the management system for a container terminal. This work focuses on three important problems that represent a bottleneck on terminal operations: Berth Allocation Problem (BAP), Quay Crane Assignment and Scheduling Problems (QCASP......).The state-of-art models mostly rely on forecasted, deterministic vessel arrivals, and they mostly assume that uniform QC operations is maintained. However, in reality, these parameters are mostly random. In this study, we present a stochastic programming approach based on a decomposition algorithm to solve...

  18. US Department of Energy Oak Ridge Operations Environmental Management Public Involvement Plan for the Oak Ridge Reservation

    International Nuclear Information System (INIS)

    1996-03-01

    This document was prepared in accordance with CERCLA requirements for writing community relations plans. It includes information on how the DOE Oak Ridge Operations Office prepares and executes Environmental Management Community relations activities. It is divided into three sections: the public involvement plan, public involvement in Oak Ridge, and public involvement in 1995. Four appendices are also included: environmental management in Oak Ridge; community and regional overview; key laws, agreements, and policy; and principal contacts

  19. Strategic and Operational Plan for Integrating Transcriptomics ...

    Science.gov (United States)

    Plans for incorporating high throughput transcriptomics into the current high throughput screening activities at NCCT; the details are in the attached slide presentation presentation on plans for incorporating high throughput transcriptomics into the current high throughput screening activities at NCCT, given at the OECD meeting on June 23, 2016

  20. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency's (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter