WorldWideScience

Sample records for deicers equipment

  1. 7 CFR 2902.37 - General purpose de-icers.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false General purpose de-icers. 2902.37 Section 2902.37... Items § 2902.37 General purpose de-icers. (a) Definition. Chemical products (e.g., salt, fluids) that... preference for qualifying biobased general purpose de-icers. By that date, Federal agencies that have the...

  2. Effect of chloride-based deicers on reinforced concrete structures.

    Science.gov (United States)

    2012-07-01

    We conducted an extensive literature review and performed laboratory tests to assess the effect of chloride-based deicers on the rebars and dowel bars in concrete and to determine whether or not deicer corrosion inhibitors help preserve the transport...

  3. Aircraft de-icer: Recycling can cut carbon emissions in half

    International Nuclear Information System (INIS)

    Johnson, Eric P.

    2012-01-01

    Flight-safety regulations in most countries require aircraft to be ice-free upon takeoff. In icy weather, this means that the aircraft usually must be de-iced (existing ice is removed) and sometimes anti-iced (to protect against ice-reformation). For both processes, aircraft typically are sprayed with an ‘antifreeze’ solution, consisting mainly of glycol diluted with water. This de/anti-icing creates an impact on the environment, of which environmental regulators have grown increasingly conscious. The US Environmental Protection Agency (EPA), for example, recently introduced stricter rules that require airports above minimum size to collect de-icing effluents and send them to wastewater treatment. De-icer collection and treatment is already done at most major airports, but a few have gone one step further: rather than putting the effluent to wastewater, they recycle it. This study examines the carbon savings that can be achieved by recycling de-icer. There are two key findings. One, recycling, as opposed to not recycling, cuts the footprint of aircraft de-icing by 40–50% — and even more, in regions where electricity-generation is cleaner. Two, recycling petrochemical-based de-icer generates a 15–30% lower footprint than using ‘bio’ de-icer without recycling. - Highlights: ► Carbon footprint of aircraft de-icing can be measured. ► Recycling aircraft de-icer cuts the footprint of aircraft de-icing by 40–50%. ► Recycling ‘fossil’ de-icer is lower carbon than not recycling ‘bio’ de-icer.

  4. Oxygen demand of aircraft and airfield pavement deicers and alternative freezing point depressants

    Science.gov (United States)

    Corsi, Steven R.; Mericas, Dean; Bowman, George

    2012-01-01

    Aircraft and pavement deicing formulations and other potential freezing point depressants were tested for biochemical oxygen demand (BOD) and chemical oxygen demand (COD). Propylene glycol-based aircraft deicers exhibited greater BOD5 than ethylene glycol-based aircraft deicers, and ethylene glycol-based products had lower degradation rates than propylene glycol-based products. Sodium formate pavement deicers had lower COD than acetate-based pavement deicers. The BOD and COD results for acetate-based pavement deicers (PDMs) were consistently lower than those for aircraft deicers, but degradation rates were greater in the acetate-based PDM than in aircraft deicers. In a 40-day testing of aircraft and pavement deicers, BOD results at 20°C (standard) were consistently greater than the results from 5°C (low) tests. The degree of difference between standard and low temperature BOD results varied among tested products. Freshwater BOD test results were not substantially different from marine water tests at 20°C, but glycols degraded slower in marine water than in fresh water for low temperature tests. Acetate-based products had greater percentage degradation than glycols at both temperatures. An additive component of the sodium formate pavement deicer exhibited toxicity to the microorganisms, so BOD testing did not work properly for this formulation. BOD testing of alternative freezing point depressants worked well for some, there was little response for some, and for others there was a lag in response while microorganisms acclimated to the freezing point depressant as a food source. Where the traditional BOD5 test performed adequately, values ranged from 251 to 1,580 g/kg. Where the modified test performed adequately, values of BOD28 ranged from 242 to 1,540 g/kg.

  5. Effects of highway-deicer application on ground-water quality in a part of the Calumet Aquifer, northwestern Indiana

    Science.gov (United States)

    Watson, Lee R.; Bayless, E. Randall; Buszka, Paul M.; Wilson, John T.

    2002-01-01

    The effects of highway-deicer application on ground-water quality were studied at a site in northwestern Indiana using a variety of geochemical indicators. Site characteristics such as high snowfall rates; large quantities of applied deicers; presence of a high-traffic highway; a homogeneous, permeable, and unconfined aquifer; a shallow water table; a known ground-water-flow direction; and minimal potential for other sources of chloride and sodium to complicate source interpretation were used to select a study area where ground water was likely to be affected by deicer application. Forty-three monitoring wells were installed in an unconfined sand aquifer (the Calumet aquifer) near Beverly Shores in northwestern Indiana. Wells were installed along two transects that approximately paralleled groundwater flow in the Calumet aquifer and crossed US?12. US?12 is a highway that receives Indiana?s highest level of maintenance to maintain safe driving conditions. Ground-water quality and water-level data were collected from the monitoring wells, and precipitation and salt-application data were compiled from 1994 through 1997. The water-quality data indicated that chloride was the most easily traced indicator of highway deicers in ground water. Concentration ratios of chloride to iodide and chloride to bromide and Stiff diagrams of major element concentrations indicated that the principal source of chloride and sodium in ground water from the uppermost one-third to one-half of the Calumet relative electromagnetic conductivity defined a distinct plume of deicer-affected water in the uppermost 8 feet of aquifer at about 9 feet horizontally from the paved roadway edge and a zone of higher conductivity than background in the lower one-third of the aquifer. Chloride and sodium in the deep parts of the aquifer originated from natural sources. Chloride and sodium from highway deicers were present in the aquifer throughout the year. The highest concentrations of chloride and sodium

  6. Deicer-freeze-thaw resistance characteristics of Portland cement concrete for Wisconsin pavements

    Science.gov (United States)

    1995-12-01

    The objectives of the study were to identify PCC mixes that offer increased deicer-freeze-thaw durability and to identify mix characteristics that contribute to premature durability distress. PCC mixes covering a range of air contents and water-cemen...

  7. Inactivation of Foot-and-Mouth Disease Virus by Citric Acid and Sodium Carbonate with Deicers

    Science.gov (United States)

    Hong, Jang-Kwan; You, Su-Hwa; Kim, Su-Mi; Tark, Dongseob; Lee, Hyang-Sim; Ko, Young-Joon; Seo, Min-Goo; Park, Jong-Hyeon; Kim, Byounghan

    2015-01-01

    Three out of five outbreaks of foot-and-mouth disease (FMD) since 2010 in the Republic of Korea have occurred in the winter. At the freezing temperatures, it was impossible to spray disinfectant on the surfaces of vehicles, roads, and farm premises because the disinfectant would be frozen shortly after discharge and the surfaces of the roads or machines would become slippery in cold weather. In this study, we added chemical deicers (ethylene glycol, propylene glycol, sodium chloride, calcium chloride, ethyl alcohol, and commercial windshield washer fluid) to keep disinfectants (0.2% citric acid and 4% sodium carbonate) from freezing, and we tested their virucidal efficacies under simulated cold temperatures in a tube. The 0.2% citric acid could reduce the virus titer 4 logs at −20°C with all the deicers. On the other hand, 4% sodium carbonate showed little virucidal activity at −20°C within 30 min, although it resisted being frozen with the function of the deicers. In conclusion, for the winter season, we may recommend the use of citric acid (>0.2%) diluted in 30% ethyl alcohol or 25% sodium chloride solvent, depending on its purpose. PMID:26319879

  8. Field Usage of Alternative Deicers for Snow and Ice Control : Transportation Research Synthesis.

    Science.gov (United States)

    2017-09-01

    This Transportation Research Synthesis (TRS) summarizes non-chloride based deicers available on the market at this time, including acetate, formate, glycol, and succinate based deicing products. This report explores their feasibility for use as alter...

  9. Inactivation of foot-and-mouth disease virus by citric acid and sodium carbonate with deicers.

    Science.gov (United States)

    Hong, Jang-Kwan; Lee, Kwang-Nyeong; You, Su-Hwa; Kim, Su-Mi; Tark, Dongseob; Lee, Hyang-Sim; Ko, Young-Joon; Seo, Min-Goo; Park, Jong-Hyeon; Kim, Byounghan

    2015-11-01

    Three out of five outbreaks of foot-and-mouth disease (FMD) since 2010 in the Republic of Korea have occurred in the winter. At the freezing temperatures, it was impossible to spray disinfectant on the surfaces of vehicles, roads, and farm premises because the disinfectant would be frozen shortly after discharge and the surfaces of the roads or machines would become slippery in cold weather. In this study, we added chemical deicers (ethylene glycol, propylene glycol, sodium chloride, calcium chloride, ethyl alcohol, and commercial windshield washer fluid) to keep disinfectants (0.2% citric acid and 4% sodium carbonate) from freezing, and we tested their virucidal efficacies under simulated cold temperatures in a tube. The 0.2% citric acid could reduce the virus titer 4 logs at -20°C with all the deicers. On the other hand, 4% sodium carbonate showed little virucidal activity at -20°C within 30 min, although it resisted being frozen with the function of the deicers. In conclusion, for the winter season, we may recommend the use of citric acid (>0.2%) diluted in 30% ethyl alcohol or 25% sodium chloride solvent, depending on its purpose. Copyright © 2015, American Society for Microbiology. All Rights Reserved.

  10. Thin film eddy current impulse deicer

    Science.gov (United States)

    Smith, Samuel O.; Zieve, Peter B.

    1990-01-01

    Two new styles of electrical impulse deicers has been developed and tested in NASA's Icing Research Tunnel. With the Eddy Current Repulsion Deicing Boot (EDB), a thin and flexible spiral coil is encapsulated between two thicknesses of elastomer. The coil, made by an industrial printed circuit board manufacturer, is bonded to the aluminum aircraft leading edge. A capacitor bank is discharged through the coil. Induced eddy currents repel the coil from the aluminum aircraft structure and shed accumulated ice. A second configuration, the Eddy Current Repulsion Deicing-Strip (EDS) uses an outer metal erosion strip fastened over the coil. Opposite flowing eddy currents repel the strip and create the impulse deicing force. The outer strip serves as a surface for the collection and shedding of ice and does not require any structural properties. The EDS is suitable for composite aircraft structures. Both systems successfully dispelled over 95 percent of the accumulated ice from airfoils over the range of the FAA icing envelope.

  11. Aquatic toxicity of airfield-pavement deicer materials and implications for airport runoff

    Science.gov (United States)

    Corsi, S.R.; Geis, S.W.; Bowman, G.; Failey, G.G.; Rutter, T.D.

    2009-01-01

    Concentrations of airfield-pavement deicer materials (PDM) in a study of airport runoff often exceeded levels of concern regarding aquatic toxicity. Toxicity tests on Vibrio fischeri, Pimephales promelas, Ceriodaphnia dubia, and Pseudokirchneriella subcapitata (commonly known as Selenastrum capricornutum) were performed with potassium acetate (K-Ac) PDM, sodium formate (Na-For) PDM, and with freezing- point depressants (K-Ac and Na-For). Results indicate that toxicity in PDM is driven by the freezing-point depressants in all tests except the Vibrio fisheri test for Na-For PDM which is influenced by an additive. Acute toxicity end points for different organisms ranged from 298 to 6560 mg/L (as acetate) for K-Ac PDM and from 1780 to 4130 mg/L (as formate) for Na- For PDM. Chronic toxicity end points ranged from 19.9 to 336 mg/L (as acetate) for K-Ac PDM and from 584 to 1670 mg/L (as formate) for Na-For PDM. Sample results from outfalls at General Mitchell International Airport in Milwaukee, Wl (GMIA) indicated that 40% of samples had concentrations greater than the aquatic-life benchmark for K-Ac PDM. K-Ac has replaced urea during the 1990s as the most widely used PDM at GMIA and in the United States. Results of ammonia samples from airport outfalls during periods when urea-based PDM was used at GMIA indicated that41% of samples had concentrations exceeding the U.S. Environmental Protection Agency (USEPA) 1 -h water-quality criterion. The USEPA 1-h water-quality criterion for chloride was exceeded in 68% of samples collected in the receiving stream, a result of road-salt runoff from urban influence near the airport. Results demonstrate that PDM must be considered to comprehensively evaluate the impact of chemical deicers on aquatic toxicity in water containing airport runoff. ?? 2009 American Chemical Society.

  12. NASA evaluation of Type 2 chemical depositions. [effects of deicer deposition on aircraft tire friction performance

    Science.gov (United States)

    Yager, Thomas J.; Stubbs, Sandy M.; Howell, W. Edward; Webb, Granville L.

    1993-01-01

    Recent findings from NASA Langley tests to define effects of aircraft Type 2 chemical deicer depositions on aircraft tire friction performance are summarized. The Aircraft Landing Dynamics Facility (ALDF) is described together with the scope of the tire cornering and braking friction tests conducted up to 160 knots ground speed. Some lower speed 32 - 96 km/hr (20 - 60 mph) test run data obtained using an Instrumented Tire Test Vehicle (ITTV) to determine effects of tire bearing pressure and transverse grooving on cornering friction performance are also discussed. Recommendations are made concerning which parameters should be evaluated in future testing.

  13. Results of Low Power Deicer tests on a swept inlet component in the NASA Lewis Icing Research Tunnel

    Science.gov (United States)

    Bond, Thomas H.; Shin, Jaiwon

    1993-01-01

    Tests were conducted under a USAF/NASA Low Power Deicer program on two expulsive technologies to examine system performance on hardware representative of a modern aircraft part. The BF Goodrich Electro-Expulsive Deicing System and Pneumatic Impulse Ice Protection system were installed on a swept, compound curve, engine inlet component with varying leading edge radius, and tested through a range of icing and system operating conditions in the NASA Lewis Icing Research Tunnel. A description of the experimental procedure and results, including residual ice thickness, shed ice particle size, and changes in system energy/pressure characteristics are presented.

  14. Characterization of aircraft deicer and anti-icer components and toxicity in airport snowbanks and snowmelt runoff

    Science.gov (United States)

    Corsi, S.R.; Geis, S.W.; Loyo-Rosales, J. E.; Rice, C.P.; Sheesley, R.J.; Failey, G.G.; Cancilla, Devon A.

    2006-01-01

    Snowbank samples were collected from snowbanks within a medium-sized airport for four years to characterize aircraft deicer and anti-icer (ADAF) components and toxicity. Concentrations of ADAF components varied with median glycol concentrations from individual sampling periods ranging from 65 to 5940 mg/L. Glycol content in snowbanks ranged from 0.17 to 11.4% of that applied to aircraft. Glycol, a freezing point depressant, was selectively removed during melt periods before snow and ice resulting in lower glycol concentrations after melt periods. Concentrations of ADAF components in airport runoff were similar during periods of snowmelt as compared to active ADAF application periods; however, due to the long duration of snowmelt events, greater masses of glycol were transported during snowmelt events. Alkylphenol ethoxylates (APEO), selected APEO degradation products, and 4- and 5-methyl-1H-benzotriazole were detected in snowbank samples and airport snowmelt. Concentrations of APEO parent products were greater in snowbank samples than in runoff samples. Relative abundance of APEO degradation products increased in the downstream direction from the snowbank to the outfalls and the receiving stream with respect to APEO parent compounds and glycol. Toxicity in Microtox assays remained in snowbanks after most glycol had been removed during melt periods. Increased toxicity in airport snowbanks as compared to other urban snowbanks was not explained by additional combustion or fuel contribution in airport snow. Organic markers suggest ADAF additives as a possible explanation for this increased toxicity. Results indicate that glycol cannot be used as a surrogate for fate and transport of other ADAF components. ?? 2006 American Chemical Society.

  15. The influence of chloride deicers on mineral nutrition and the health status of roadside trees in the city of Kielce, Poland.

    Science.gov (United States)

    Gałuszka, Agnieszka; Migaszewski, Zdzisław M; Podlaski, Rafał; Dołęgowska, Sabina; Michalik, Artur

    2011-05-01

    Application of chemical road deicers has a negative impact on roadside vegetation. Every year, the trees in cities suffer from direct and indirect effects of salt application for winter road maintenance. To elucidate this problem in the city of Kielce, the chemistry of snow, soil, tree bark, and leaf samples has been investigated together with an assessment of the health status of the trees. Twelve investigation sites were selected along the roads with different traffic intensity. Snow samples were collected twice during the winter and analyzed for pH, EC, Na(+), Ca(2+), Mg(2+), and Cl(-). In soil (collected from two depth intervals), tree bark, and leaf samples, the concentrations of B, Ca, Fe, K, Mg, Mn, N, Na, P, S, and Zn were determined. The contents of total organic carbon (TOC) in soils, as well as the pH of soil and tree bark samples were also measured. Negative symptoms revealed by roadside trees included the loss of assimilative apparatus and decreased vitality. The results of chemical analyses indicated that the snowmelt might be a substantial source of chloride ions and alkalizing substances that influenced higher pH of soils. The soil samples displayed elevated concentrations of S and Zn and lower than typical for soil contents of B, Mg, and TOC. The pH of alkaline soils favored greater bioavailability of B and reduced bioavailability of Na and Zn by the trees examined.

  16. Selection of equipment for equipment qualification

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report describes the methodology applied in selecting equipment in the special safety systems for equipment qualification in the CANDU 600 MW nuclear generating stations at Gentilly 2 and Point Lepreau. Included is an explanation of the selection procedure adopted and the rationale behind the criteria used in identifying the equipment. The equipment items on the list have been grouped into three priority categories as a planning aid to AECB staff for a review of the qualification status of the special safety systems

  17. Generation of equipment response spectrum considering equipment-structure interaction

    International Nuclear Information System (INIS)

    Lee, Sang Hoon; Yoo, Kwang Hoon

    2005-01-01

    Floor response spectra for dynamic response of subsystem such as equipment, or piping in nuclear power plant are usually generated without considering dynamic interaction between main structure and subsystem. Since the dynamic structural response generally has the narrow-banded shapes, the resulting floor response spectra developed for various locations in the structure usually have high spectral peak amplitudes in the narrow frequency bands corresponding to the natural frequencies of the structural system. The application of such spectra for design of subsystems often leads to excessive design conservatisms, especially when the equipment frequency and structure are at resonance condition. Thus, in order to provide a rational and realistic design input for dynamic analysis and design of equipment, dynamic equipment-structure interaction (ESI) should be considered in developing equipment response spectrum which is particularly important for equipment at the resonance condition. Many analytical methods have been proposed in the past for developing equipment response spectra considering ESI. However, most of these methods have not been adapted to the practical applications because of either the complexities or the lack of rigorousness of the methods. At one hand, mass ratio among the equipment and structure was used as an important parameter to obtain equipment response spectra. Similarly, Tseng has also proposed the analytical method for developing equipment response spectra using mass ratio in the frequency domain. This method is analytically rigorous and can be easily validated. It is based on the dynamic substructuring method as applied to the dynamic soil-structure interaction (SSI) analysis, and can relatively easily be implemented for practical applications without to change the current dynamic analysis and design practice for subsystems. The equipment response spectra derived in this study are also based on Tseng's proposed method

  18. 9 CFR 590.502 - Equipment and utensils; PCB-containing equipment.

    Science.gov (United States)

    2010-01-01

    ... Sanitary Standards and accepted practices currently in effect for such equipment. (c) New or replacement equipment or machinery (including any replacement parts) brought onto the premises of any official plant... equipment and machinery, and any replacement parts for such equipment and machinery. Totally enclosed...

  19. Equipment considerations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Trace or ultratrace analyses require that the HPLC equipment used, including the detector, be optimal for such determinations. HPLC detectors are discussed at length in Chapter 4; discussion here is limited to the rest of the equipment. In general, commercial equipment is adequate for trace analysis; however, as the authors approach ultratrace analysis, it becomes very important to examine the equipment thoroughly and optimize it, where possible. For this reason they will review the equipment commonly used in HPLC and discuss the optimization steps. Detectability in HPLC is influenced by two factors (1): (a) baseline noise or other interferences that lead to errors in assigning the baseline absorbance; (b) peak width. 87 refs

  20. Medical Issues: Equipment

    Science.gov (United States)

    ... Information Packets Equipment Pool Living With SMA Medical Issues Palliative Breathing Orthopedics Nutrition Equipment Daily Life At ... curesma.org > support & care > living with sma > medical issues > equipment Equipment Individuals with SMA often require a ...

  1. Semiconductor Manufacturing equipment introduction

    International Nuclear Information System (INIS)

    Im, Jong Sun

    2001-02-01

    This book deals with semiconductor manufacturing equipment. It is comprised of nine chapters, which are manufacturing process of semiconductor device, history of semiconductor manufacturing equipment, kinds and role of semiconductor manufacturing equipment, construction and method of semiconductor manufacturing equipment, introduction of various semiconductor manufacturing equipment, spots of semiconductor manufacturing, technical elements of semiconductor manufacturing equipment, road map of technology of semiconductor manufacturing equipment and semiconductor manufacturing equipment in the 21st century.

  2. Electrical equipment qualification

    International Nuclear Information System (INIS)

    Farmer, W.S.

    1983-01-01

    Electrical equipment qualification research programs being carried out by CEA, JAERI, and Sandia Laboratories are discussed. Objectives of the program are: (1) assessment of accident simulation methods for electrical equipment qualification testing; lower coarse (2) evaluation of equipment aging and accelerated aging methods; (3) determine radiation dose spectrum to electrical equipment and assess simulation methods for qualification; (4) identify inadequacies in electrical equipment qualification procedures and standards and potential failure modes; and (5) provide data for verifying and improving standards, rules and regulatory guides

  3. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  4. Environmental Aspects of Aircraft and Airfield Deicing - An Air Force Perspective

    Science.gov (United States)

    2010-11-01

    e l l e n c e COD of Aircraft Deicers ADF Kg O2/Kg compd Ethylene glycol 1.14 T Propylene glycol 1.47 T Isopropyl alcohol 2.11 T Neopentyl glycol ...showed that commercial airports use about 25 million gallons of Aircraft Deicing Fluid (ADF) annually, of which 22.1 M (88%) is Propylene Glycol (PG...S e r v i c e - E x c e l l e n c e AF Aircraft Deicing Overview 70% (107) of bases reported using aircraft deicers Propylene Glycol (PG), AMS 1424

  5. RETRIEVAL EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    J. Steinhoff

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) retrieval from the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. There are no quality assurance requirements or QA controls in this document. Retrieval under normal conditions is accomplished with the same fleet of equipment as is used for emplacement. Descriptions of equipment used for retrieval under normal conditions is found in Emplacement Equipment Descriptions, DI: BCAF00000-01717-5705-00002 (a document in progress). Equipment used for retrieval under abnormal conditions is addressed in this document and consists of the following: (1) Inclined Plane Hauler; (2) Bottom Lift Transporter; (3) Load Haul Dump (LHD) Loader; (4) Heavy Duty Forklift for Emplacement Drifts; (5) Covered Shuttle Car; (6) Multipurpose Vehicle; and (7) Scaler

  6. Data communication equipment

    International Nuclear Information System (INIS)

    Kim, Hak Seon; Lee, Sang Mok

    1998-02-01

    The contents of this book are introduction of data communication on definition, purpose and history, information terminal about data communication system and data transmission system, data transmit equipment of summary, transmission cable, data port, concentrator and front-end processor, audio communication equipment like phones, radio communication equipment of summary on foundation of electromagnetic waves, AM transmitter, AM receiver, FM receiver and FM transmitter, a satellite and mobile communication equipment such as earth station, TT and C and Cellular phone, video telephone and new media apparatus.

  7. Medical equipment management

    CERN Document Server

    Willson, Keith; Tabakov, Slavik

    2013-01-01

    Know What to Expect When Managing Medical Equipment and Healthcare Technology in Your Organization As medical technology in clinical care becomes more complex, clinical professionals and support staff must know how to keep patients safe and equipment working in the clinical environment. Accessible to all healthcare professionals and managers, Medical Equipment Management presents an integrated approach to managing medical equipment in healthcare organizations. The book explains the underlying principles and requirements and raises awareness of what needs to be done and what questions to ask. I

  8. Renewal of radiological equipment.

    Science.gov (United States)

    2014-10-01

    In this century, medical imaging is at the heart of medical practice. Besides providing fast and accurate diagnosis, advances in radiology equipment offer new and previously non-existing options for treatment guidance with quite low morbidity, resulting in the improvement of health outcomes and quality of life for the patients. Although rapid technological development created new medical imaging modalities and methods, the same progress speed resulted in accelerated technical and functional obsolescence of the same medical imaging equipment, consequently creating a need for renewal. Older equipment has a high risk of failures and breakdowns, which might cause delays in diagnosis and treatment of the patient, and safety problems both for the patient and the medical staff. The European Society of Radiology is promoting the use of up-to-date equipment, especially in the context of the EuroSafe Imaging Campaign, as the use of up-to-date equipment will improve quality and safety in medical imaging. Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or renewal. This plan should look forward a minimum of 5 years, with annual updates. Teaching points • Radiological equipment has a definite life cycle span, resulting in unavoidable breakdown and decrease or loss of image quality which renders equipment useless after a certain time period.• Equipment older than 10 years is no longer state-of-the art equipment and replacement is essential. Operating costs of older equipment will be high when compared with new equipment, and sometimes maintenance will be impossible if no spare parts are available.• Older equipment has a high risk of failure and breakdown, causing delays in diagnosis and treatment of the patient and safety problems both for the patient and the medical staff.• Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or replacement. This plan should look forward a

  9. 29 CFR 97.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  10. 44 CFR 13.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  11. 24 CFR 85.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  12. 43 CFR 12.72 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  13. Remote handling equipment

    International Nuclear Information System (INIS)

    Clement, G.

    1984-01-01

    After a definition of intervention, problems encountered for working in an adverse environment are briefly analyzed for development of various remote handling equipments. Some examples of existing equipments are given [fr

  14. Used energy-related laboratory equipment grant program for institutions of higher learning. Eligible equipment catalog

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This is a listing of energy related equipment available through the Energy-Related Laboratory Equipment Grant Program which grants used equipment to institutions of higher education for energy-related research. Information included is an overview of the program, how to apply for a grant of equipment, eligibility requirements, types of equipment available, and the costs for the institution.

  15. Equipment repair in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, S

    1982-01-01

    Most equipment in Chinese coal mines consists of machinery and equipment produced in the 1950s; the efficiency of 4-62, CTD-57 and 70B/sub 2/ ventilators is 15% lower than that of new ones; that of SSM and AYaP pumps, 10% lower than of modern ones. Equipment renovation is done in three ways: replacing obsolete equipment with new equipment of the same type; improving the performance of existing equipment by introducing efficiency and reconstruction; and replacing obsolete equipment with advanced equipment. It is indicated that the second way, for example, replacement of 4-62 ventilator blades with a maximum efficiency of 73% by 4-72 ventilator blades raises its efficiency to 90%. Replacing the 8DA-8x3 water pump, having a maximum efficiency of 63%, with the 200D 43x3 pump with a maximum efficiency of 78%, enables an electricity savings of 7000 yuan per year, which exceeds all replacement costs (600 yuan). The need to improve equipment maintenance and preventive work to increase equipment service life and to introduce new techniques and efficiency is noted.

  16. BP volume reduction equipment

    International Nuclear Information System (INIS)

    Kitamura, Yoshinori; Muroo, Yoji; Hamanaka, Isao

    2003-01-01

    A new type of burnable poison (BP) volume reduction system is currently being developed. Many BP rods, a subcomponent of spent fuel assemblies are discharged from nuclear power reactors. This new system reduces the overall volume of BP rods. The main system consists of BP rod cutting equipment, equipment for the recovery of BP cut pieces, and special transport equipment for the cut rods. The equipment is all operated by hydraulic press cylinders in water to reduce operator exposure to radioactivity. (author)

  17. Exercise Equipment: Neutral Buoyancy

    Science.gov (United States)

    Shackelford, Linda; Valle, Paul

    2016-01-01

    Load Bearing Equipment for Neutral Buoyancy (LBE-NB) is an exercise frame that holds two exercising subjects in position as they apply counter forces to each other for lower extremity and spine loading resistance exercises. Resistance exercise prevents bone loss on ISS, but the ISS equipment is too massive for use in exploration craft. Integrating the human into the load directing, load generating, and motion control functions of the exercise equipment generates safe exercise loads with less equipment mass and volume.

  18. 22 CFR 135.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  19. 21 CFR 1403.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  20. 45 CFR 602.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  1. 49 CFR 18.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  2. 34 CFR 80.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  3. 10 CFR 600.232 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  4. 45 CFR 1183.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  5. Development of manufacturing equipment and QC equipment for DUPIC fuel

    International Nuclear Information System (INIS)

    Yang, Myung Seung; Park, J.J.; Lee, J.W.; Kim, S.S.; Yim, S.P.; Kim, J.H.; Kim, K.H.; Na, S.H.; Kim, W.K.; Shin, J.M.; Lee, D.Y.; Cho, K.H.; Lee, Y.S.; Sohn, J.S.; Kim, M.J.

    1999-05-01

    In this study, DUPIC powder and pellet fabrication equipment, welding system, QC equipment, and fission gas treatment are developed to fabricate DUPIC fuel at IMEF M6 hot cell. The systems are improved to be suitable for remote operation and maintenance with the manipulator at hot cell. Powder and pellet fabrication equipment have been recently developed. The systems are under performance test to check remote operation and maintenance. Welding chamber and jigs are designed and developed to remotely weld DUPIC fuel rod with manipulators at hot cell. Remote quality control equipment are being tested for analysis and inspection of DUPIC fuel characteristics at hot cell. And trapping characteristics is analyzed for cesium and ruthenium released under oxidation/reduction and sintering processes. The design criteria and process flow diagram of fission gas treatment system are prepared incorporating the experimental results. The fission gas treatment system has been successfully manufactured. (Author). 33 refs., 14 tabs., 91 figs

  6. 45 CFR 1174.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  7. 45 CFR 1157.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  8. PROBLEMS PERTAINING TO DIVERSIFICATION OF CIVIL EQUIPMENT IN EQUIPMENT OF MILITARY PURPOSE

    OpenAIRE

    A. I. Kotlabay; V. A. Korobkin; V. F. Tamelo; I. V. Kostko; S. V. Kondratiev

    2009-01-01

    Study of directions concerning development of military equipment, its modernization with the purpose to improve its military efficiency is an actual problem for the Armed Forces, military science, designers and researchers.The paper analyzes and estimates possibilities to use civil equipment for military purpose. Problems pertaining to technologies of double application, diversification of civil equipment in military engineering machinery are considered in the paper.

  9. 20 CFR 437.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use.... Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Equipment. 437.32 Section 437.32 Employees...

  10. Free-world microelectronic manufacturing equipment

    Science.gov (United States)

    Kilby, J. S.; Arnold, W. H.; Booth, W. T.; Cunningham, J. A.; Hutcheson, J. D.; Owen, R. W.; Runyan, W. R.; McKenney, Barbara L.; McGrain, Moira; Taub, Renee G.

    1988-12-01

    Equipment is examined and evaluated for the manufacture of microelectronic integrated circuit devices and sources for that equipment within the Free World. Equipment suitable for the following are examined: single-crystal silicon slice manufacturing and processing; required lithographic processes; wafer processing; device packaging; and test of digital integrated circuits. Availability of the equipment is also discussed, now and in the near future. Very adequate equipment for most stages of the integrated circuit manufacturing process is available from several sources, in different countries, although the best and most widely used versions of most manufacturing equipment are made in the United States or Japan. There is also an active market in used equipment, suitable for manufacture of capable integrated circuits with performance somewhat short of the present state of the art.

  11. 34 CFR 74.34 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... as program income. (e) When acquiring replacement equipment, the recipient may use the equipment to... replacement equipment subject to the approval of the Secretary. (f) The recipient's property management... 34 Education 1 2010-07-01 2010-07-01 false Equipment. 74.34 Section 74.34 Education Office of the...

  12. 45 CFR 2541.320 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... replacement equipment, the grantee or subgrantee may use the equipment to be replaced as a trade-in or sell... replacement equipment), whether acquired in whole or in part with grant funds, until disposition takes place... ensure the highest possible return. (e) Disposition. When original or replacement equipment acquired...

  13. Visual communication and terminal equipment

    International Nuclear Information System (INIS)

    Kang, Cheol Hui

    1988-06-01

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  14. Visual communication and terminal equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Cheol Hui

    1988-06-15

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  15. Equipment design guidance document for flammable gas waste storage tank new equipment

    International Nuclear Information System (INIS)

    Smet, D.B.

    1996-01-01

    This document is intended to be used as guidance for design engineers who are involved in design of new equipment slated for use in Flammable Gas Waste Storage Tanks. The purpose of this document is to provide design guidance for all new equipment intended for application into those Hanford storage tanks in which flammable gas controls are required to be addressed as part of the equipment design. These design criteria are to be used as guidance. The design of each specific piece of new equipment shall be required, as a minimum to be reviewed by qualified Unreviewed Safety Question evaluators as an integral part of the final design approval. Further Safety Assessment may be also needed. This guidance is intended to be used in conjunction with the Operating Specifications Documents (OSDs) established for defining work controls in the waste storage tanks. The criteria set forth should be reviewed for applicability if the equipment will be required to operate in locations containing unacceptable concentrations of flammable gas

  16. Environmental/dynamic mechanical equipment qualification and dynamic electrical equipment qualification program (EDQP)

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1984-01-01

    Equipment qualification research is being conducted to investigate acceptable criteria, requirements, and methodologies for the dynamic (including seismic) and environmental qualification of mechanical equipment and for the dynamic (including seismic) qualification of electrical equipment. The program is organized into three elements: (1) General Research, (2) Environmental Research, and (3) Dynamic Research. This paper presents the highlights of the results to date in these three elements of the program

  17. Use of Equipment Information System (EQUIS) to determine priority for purchasing safeguards equipment

    International Nuclear Information System (INIS)

    Silberberg, S.

    1988-01-01

    To manage its large world-wide inventory of safeguards equipment, the IAEA Safeguards department uses a computerized Equipment Information System (EQUIS). EQUIS data have been analyzed using Queueing Theory to determine if inventory is adequate to meet inspector demands and in those cases where it is inadequate, to indicate how many additional units should be procured. Results are tabulated for various types of non-destructive analysis (NDA) equipment. For equipment where there is a high turnover and hence a large amount of data, the analysis provides a powerful tool for assisting procurement decisions

  18. Overall Equipment Effectiveness Implementation Criteria

    Science.gov (United States)

    Abramova, I. G.; Abramov, D. A.

    2018-01-01

    This article documents the methods applied in production control technics specifically focused on commonly used parameter OEE (Overall Equipment Effectiveness). The indicators of extensive and intensive use of equipment are considered. Their appointment this is comparison in the same type of production within the industry and comparison of single-type and / or different types of equipment in terms of capacity. However, it is shown that there is no possibility of revealing the reasons for the machine’s operation: productive / unproductive, with disturbances. Therefore, in the article reveals the approaches to calculating the indicator characterizing the direct operation of the equipment. The Machine Load coefficient is approaching closely to the indicator of the efficiency of the use of equipment. Methods analysis is proceeded through the historically applied techniques such as “Stopwatch” and “Motion” studies. Was performed the analysis of the efficiency index of OEE equipment using the comparable indexes performance of equipment in the Russian practice. An important indicator of OEE contains three components. The meaning of each of them reflects historically applicable indicators. The value of the availability of equipment indicator is close to the value of the equipment extensibility index. The value of the indicator of the efficiency of work can be compared with the characteristic of the capacity of the equipment and the indicator of the quality level can meet the requirements for compliance with the manufacturing technology. Shown that the sum of the values of the coefficient of “Availability” of the equipment and the value of the “Factor of compaction of working hours” are one. As well as the total value of the indicator “level of quality” and the coefficient of marriage given in the result unit. The measurability of the indicators makes it possible to make a prediction about efficiency of the equipment.

  19. Corrosion of metals exposed to 25% magnesium chloride solution and tensile stress: Field and laboratory studies

    Directory of Open Access Journals (Sweden)

    Xianming Shi

    2017-12-01

    Full Text Available The use of chemicals for snow and ice control operations is a common practice for improving the safety and mobility of roadways in cold climate, but brings significant concerns over their risks including the corrosive effects on transportation infrastructure and motor vehicles. The vast majority of existing studies and methods to test the deicer corrosivity have been restricted to laboratory environments and unstressed metals, which may not reliably simulate actual service conditions. As such, we report a case study in which stainless steel SS 304 (unstressed and externally tensile stressed, aluminum (Al 1100 and low carbon steel (C1010 coupons were exposed to 25% MgCl2 under field conditions for six weeks. A new corrosion test-bed was developed in Montana to accelerate the field exposure to this deicer. To further investigate the observed effect of tensile stress on the corrosion of stainless steel, SS 304 (unstressed and externally stressed coupons were exposed to 25% MgCl2 solution under the laboratory conditions. The C 1010 exhibited the highest percentage of rust area and suffered the most weight loss as a result of field exposure and MgCl2 sprays. In terms of ultimate tensile strength, the Al 1100 coupons saw the greatest reduction and the unstressed and externally stressed SS 304 coupons saw the least. The ability of MgCl2 to penetrate deep into the matrix of aluminum alloy poses great risk to such structural material. Tensile stressed SS 304 suffered more corrosion than unstressed SS 304 in both the field and laboratory conditions. Results from this case study may shed new light on the deicer corrosion issue and help develop improved field testing methods to evaluate the deicer corrosivity to metals in service.

  20. Chapter 12. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  1. 41 CFR 105-71.132 - Equipment.

    Science.gov (United States)

    2010-07-01

    .... (4) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be... managing equipment (including replacement equipment), whether acquired in whole or in part with grant funds... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Equipment. 105-71.132...

  2. 1968 Listing of Swimming Pool Equipment.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI. Testing Lab.

    An up-to-date listing of swimming pool equipment including--(1) companies authorized to display the National Sanitation Foundation seal of approval, (2) equipment listed as meeting NSF swimming pool equipment standards relating to diatomite type filters, (3) equipment listed as meeting NSF swimming pool equipment standard relating to sand type…

  3. 29 CFR 1926.952 - Mechanical equipment.

    Science.gov (United States)

    2010-07-01

    ... equipment that are not covered with insulating protective equipment. (c) Derrick trucks, cranes and other lifting equipment. (1) All derrick trucks, cranes and other lifting equipment shall comply with subpart N...

  4. Equipment Operational Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  5. Characterization equipment essential drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered Support drawings until the Characterization Equipment Drawing Evaluation Report is completed

  6. Energy to the Edge (E2E) Equipment Assessment U.S. Army Rapid Equipping Force

    Science.gov (United States)

    2015-05-01

    84 Contents Energy to the Edge • U.S. Army Rapid Equipping Force U.S. Army Rapid Equipping Force 1.0 Executive Summary Executive Summary U.S. Army... audiovisual equipment. • Once radiant barrier liner is inserted, the process of subsequent setups • Cables for lighting and outlets are located...behind the internal barrier • The shelter comes with organic audiovisual equipment. b. • • This shelter has a different setup and tear down process

  7. Information technology equipment cooling method

    Science.gov (United States)

    Schultz, Mark D.

    2015-10-20

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools air utilized by the rack of information technology equipment to cool the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat generated by the rack of information technology equipment.

  8. Equipment abnormality monitoring device

    International Nuclear Information System (INIS)

    Ando, Yasumasa

    1991-01-01

    When an operator hears sounds in a plantsite, the operator compares normal sounds of equipment which he previously heard and remembered with sounds he actually hears, to judge if they are normal or abnormal. According to the method, there is a worry that abnormal conditions can not be appropriately judged in a case where the number of objective equipments is increased and in a case that the sounds are changed gradually slightly. Then, the device of the present invention comprises a plurality of monitors for monitoring the operation sound of equipments, a recording/reproducing device for recording and reproducing the signals, a selection device for selecting the reproducing signals among the recorded signals, an acoustic device for converting the signals to sounds, a switching device for switching the signals to be transmitted to the acoustic device between to signals of the monitor and the recording/reproducing signals. The abnormality of the equipments can be determined easily by comparing the sounds representing the operation conditions of equipments for controlling the plant operation and the sounds recorded in their normal conditions. (N.H.)

  9. 40 CFR 31.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Equipment. 31.32 Section 31.32...

  10. 14 CFR 1273.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Equipment. 1273.32 Section 1273.32...

  11. 29 CFR 1470.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 29 Labor 4 2010-07-01 2010-07-01 false Equipment. 1470.32 Section 1470.32 Labor Regulations...

  12. 38 CFR 43.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Equipment. 43.32 Section...

  13. Making petroleum equipment safe, a priority

    International Nuclear Information System (INIS)

    1999-01-01

    Changes to the 'Act respecting the use of petroleum products' have been announced effective May 1, 1999. The changes have been made to reduce problems which can be attributed to petroleum product leaks. The new regulations will make owners and users of petroleum equipment, including underground and above-ground storage equipment and commercial storage tanks, more accountable for the use of their own equipment. The emphasis in the new regulations is based upon the storage capacity of petroleum equipment and the risks associated with this equipment, rather than the on the activities of the owners concerned. Accordingly, the new regulations call for stricter requirements for high-risk equipment, a private equipment inspection plan, a two-year operating permit, replacing the current permits and certificates, a tariff structure based on the risks associated with the equipment, and deregulation of commercial activities involving petroleum products that require no equipment. Additionally, the amendments to the Act transfer responsibility for administration to the Regie du batiment and to the Ministere des Transports. Details of each of these changes are explained

  14. 13 CFR 143.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Equipment. 143.32 Section 143.32...

  15. 32 CFR 33.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 32 National Defense 1 2010-07-01 2010-07-01 false Equipment. 33.32 Section 33.32 National Defense...

  16. 45 CFR 92.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment. 92.32 Section 92.32 Public Welfare...

  17. 15 CFR 24.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Equipment. 24.32 Section 24.32...

  18. Seismic qualification of non-safety class equipment whose failure would damage safety class equipment

    International Nuclear Information System (INIS)

    LaSalle, F.R.

    1991-01-01

    Both Code of Federal Regulations, Title 10, Part 50, and US Department of Energy Order 6340.1A have requirements to assess the interaction of non-safety and safety class structures and equipment during a seismic event to maintain the safety function. At the Hanford Site, a cost effective program has been developed to perform the evaluation of non-safety class equipment. Seismic qualification is performed by analysis, test, or upgrading of the equipment to ensure the integrity of safety class structures and equipment. This paper gives a brief overview and synopsis that address design analysis guidelines including applied loading, damping values, component anchorage, allowable loads, and stresses. Test qualification of equipment and walkdown acceptance criteria for heating ampersand ventilation (H ampersand V) ducting, conduit, cable tray, missile zone of influence, as well as energy criteria are presented

  19. Days individual equipment of protection and professional risks; Equipements de protection individuelle et risques professionnelles

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    The personal protection equipment is studied in the legal way (legal liabilities, certification, European texts), technical way (ergonomics, painfulness of ventilated equipment wearing, reliability of a respirable air line, protection gloves against the chemical risk, exposure to nano particulates, working in hot area), human factors (hostile area and emotion management), studies on personal equipment such evaluation, efficiency, conception of new equipment, physiological tolerance, limit of use, and some general safety studies on the working places. (N.C.)

  20. Equipment standards for interventional cardiology

    International Nuclear Information System (INIS)

    Dowling, A.; Gallagher, A.; Walsh, C.; Malone, J.

    2005-01-01

    Interventional radiology has seen rapid growth in cardiology and represents an alternative to hazardous surgery. Recently there has been a substantial growth in the number of procedures being performed and interventional cardiology (IC) procedures are the most common interventional procedures in Europe. Advances in imaging technology have facilitated the development of increasingly complex radiological IC equipment. Currently, the technology is developing at a rate ahead of supporting research, equipment standards and a regulatory framework. International standards play a key role in the design, manufacture and performance of radiological IC equipment. A survey of 12 IC systems (15 imaging chains) was conducted in Irish hospitals. The aim of the study was to assess the imbalance between rapidly advancing technology and existing standards and to propose recommendations for new IC equipment standards. The results demonstrate the need for definitive equipment requirements and standardisation in the design, manufacture, acceptance and maintenance of IC equipment. (authors)

  1. Equipment for hydraulic testing

    International Nuclear Information System (INIS)

    Jacobsson, L.; Norlander, H.

    1981-07-01

    Hydraulic testing in boreholes is one major task of the hydrogeological program in the Stripa Project. A new testing equipment for this purpose was constructed. It consists of a downhole part and a surface part. The downhole part consists of two packers enclosing two test-sections when inflated; one between the packers and one between the bottom packer and the bottom of the borehole. A probe for downhole electronics is also included in the downhole equipment together with electrical cable and nylon tubing. In order to perform shut-in and pulse tests with high accuracy a surface controlled downhole valve was constructed. The surface equipment consists of the data acquisition system, transducer amplifier and surface gauges. In the report detailed descriptions of each component in the whole testing equipment are given. (Auth.)

  2. Shipboard and laboratory equipment

    Digital Repository Service at National Institute of Oceanography (India)

    Shyamprasad, M.; Ramaswamy, V.

    The polymetallic nodules occur at an average depth of 4500 m. Adequate equipment and techniques are required for the exploration at such depths. Shipboard and various laboratory equipments for the sampling of polymetallic nodules is described...

  3. 40 CFR 792.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Equipment design. 792.61 Section 792.61...) GOOD LABORATORY PRACTICE STANDARDS Equipment § 792.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  4. 40 CFR 160.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Equipment design. 160.61 Section 160... LABORATORY PRACTICE STANDARDS Equipment § 160.61 Equipment design. Equipment used in the generation... appropriate design and adequate capacity to function according to the protocol and shall be suitably located...

  5. Equipment installation structure of roof slab for tank type FBR and method of equipment installation

    International Nuclear Information System (INIS)

    Sakai, Takao; Yamakawa, Masanori; Otsuka, Masaya; Sekine, Katsuhisa

    1986-01-01

    Purpose: To reduce equipment thermal stress and deformation by eliminating uneven temperature distribution caused at the equipment through section of the roof slab for the tank FBR, and at the same time, simplify the structure installation. Method: Multiple number of vertical fin projects are fit on the equipment through-section inside wall for the roof slab and the cylindrical equipment peripheral wall, and with these projected fins, the ring space of the through section is vertically divided into multiple sections in the circumferential direction. The vertical fins on the through-section inside wall and the fins on the equipment peripheral wall are contacted with each other by revolving them in the lateral direction. As a result, the natural convection caused by the difference of temperatures in the vertical direction of the ring space becomes a convection within each sector divided, and never generates circumferential circulation, which reduce uneven temperature distribution caused at the equipment through section. (Kawakami, Y.)

  6. Management methodology for pressure equipment

    Science.gov (United States)

    Bletchly, P. J.

    Pressure equipment constitutes a significant investment in capital and a major proportion of potential high-risk plant in many operations and this is particularly so in an alumina refinery. In many jurisdictions pressure equipment is also subject to statutory regulation that imposes obligations on Owners of the equipment with respect to workplace safety. Most modern technical standards and industry codes of practice employ a risk-based approach to support better decision making with respect to pressure equipment. For a management system to be effective it must demonstrate that risk is being managed within acceptable limits.

  7. 21 CFR 58.61 - Equipment design.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Equipment design. 58.61 Section 58.61 Food and... PRACTICE FOR NONCLINICAL LABORATORY STUDIES Equipment § 58.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  8. 21 CFR 866.4540 - Immunonephelometer equipment.

    Science.gov (United States)

    2010-04-01

    ...) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents § 866.4540 Immunonephelometer equipment. (a) Identification. Immunonephelometer equipment for clinical use...

  9. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  10. Development of Turbulence-Measuring Equipment

    Science.gov (United States)

    Kovasznay, Leslie S G

    1954-01-01

    Hot wire turbulence-measuring equipment has been developed to meet the more stringent requirements involved in the measurement of fluctuations in flow parameters at supersonic velocities. The higher mean speed necessitates the resolution of higher frequency components than at low speed, and the relatively low turbulence level present at supersonic speed makes necessary an improved noise level for the equipment. The equipment covers the frequency range from 2 to about 70,000 cycles per second. Constant-current operation is employed. Compensation for hot-wire lag is adjusted manually using square-wave testing to indicate proper setting. These and other features make the equipment adaptable to all-purpose turbulence work with improved utility and accuracy over that of older types of equipment. Sample measurements are given to demonstrate the performance.

  11. 21 CFR 866.4520 - Immunofluorometer equipment.

    Science.gov (United States)

    2010-04-01

    ...) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents § 866.4520 Immunofluorometer equipment. (a) Identification. Immunofluorometer equipment for clinical use with...

  12. Data Center Equipment Location and Monitoring System

    DEFF Research Database (Denmark)

    2013-01-01

    Abstract: Data center equipment location systems include hardware and software to provide information on the location, monitoring, and security of servers and other equipment in equipment racks. The systems provide a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to an equipment rack controller on the equipment rack. The equipment rack controllers link to a central control computer that provides an operator ...

  13. Equipment Reliability Process in Krsko NPP

    International Nuclear Information System (INIS)

    Gluhak, M.

    2016-01-01

    To ensure long-term safe and reliable plant operation, equipment operability and availability must also be ensured by setting a group of processes to be established within the nuclear power plant. Equipment reliability process represents the integration and coordination of important equipment reliability activities into one process, which enables equipment performance and condition monitoring, preventive maintenance activities development, implementation and optimization, continuous improvement of the processes and long term planning. The initiative for introducing systematic approach for equipment reliability assuring came from US nuclear industry guided by INPO (Institute of Nuclear Power Operations) and by participation of several US nuclear utilities. As a result of the initiative, first edition of INPO document AP-913, 'Equipment Reliability Process Description' was issued and it became a basic document for implementation of equipment reliability process for the whole nuclear industry. The scope of equipment reliability process in Krsko NPP consists of following programs: equipment criticality classification, preventive maintenance program, corrective action program, system health reports and long-term investment plan. By implementation, supervision and continuous improvement of those programs, guided by more than thirty years of operating experience, Krsko NPP will continue to be on a track of safe and reliable operation until the end of prolonged life time. (author).

  14. Data center equipment location and monitoring system

    DEFF Research Database (Denmark)

    2011-01-01

    A data center equipment location system includes both hardware and software to provide for location, monitoring, security and identification of servers and other equipment in equipment racks. The system provides a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to a equipment rack controller on the equipment rack. The equipment rack controllers then link over a local area network to a central control computer. The central control computer provides an operator interface......, and runs a software application program that communicates with the equipment rack controllers. The software application program of the central control computer stores IDs of the equipment rack controllers and each of its connected electronic ID tags in a database.; The software application program...

  15. 7 CFR 3015.167 - Replacement of equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Replacement of equipment. 3015.167 Section 3015.167..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.167 Replacement of equipment. (a) If needed, equipment may be exchanged for replacement equipment. Replacement of equipment may be...

  16. Use of commercial grade equipment and industrial standards for equipment qualification

    International Nuclear Information System (INIS)

    Gradin, L.P.; Muller, E.S.

    1984-01-01

    One of the most controversial issues is the proper application of Arrhenius aging methodology. Naturally and artificially aged equipment used in type test programs are often costly and burdensome tasks. Appropriate use of non-nuclear industrial standards and comparison to past history can demonstrate, with reasonable assurance, that equipment is qualified with proper consideration of aging. Specific review of the industrial standards available and application examples are provided

  17. Cooling of electronic equipment

    DEFF Research Database (Denmark)

    A. Kristensen, Anders Schmidt

    2003-01-01

    Cooling of electronic equipment is studied. The design size of electronic equipment decrease causing the thermal density to increase. This affect the cooling which can cause for example failures of critical components due to overheating or thermal induced stresses. Initially a pin fin heat sink...

  18. 46 CFR 180.175 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Survival craft equipment. 180.175 Section 180.175... TONS) LIFESAVING EQUIPMENT AND ARRANGEMENTS Survival Craft Arrangements and Equipment § 180.175 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, and...

  19. Prioritizing equipment for replacement.

    Science.gov (United States)

    Capuano, Mike

    2010-01-01

    It is suggested that clinical engineers take the lead in formulating evaluation processes to recommend equipment replacement. Their skill, knowledge, and experience, combined with access to equipment databases, make them a logical choice. Based on ideas from Fennigkoh's scheme, elements such as age, vendor support, accumulated maintenance cost, and function/risk were used.6 Other more subjective criteria such as cost benefits and efficacy of newer technology were not used. The element of downtime was also omitted due to the data element not being available. The resulting Periop Master Equipment List and its rationale was presented to the Perioperative Services Program Council. They deemed the criteria to be robust and provided overwhelming acceptance of the list. It was quickly put to use to estimate required capital funding, justify items already thought to need replacement, and identify high-priority ranked items for replacement. Incorporating prioritization criteria into an existing equipment database would be ideal. Some commercially available systems do have the basic elements of this. Maintaining replacement data can be labor-intensive regardless of the method used. There is usually little time to perform the tasks necessary for prioritizing equipment. However, where appropriate, a clinical engineering department might be able to conduct such an exercise as shown in the following case study.

  20. 46 CFR 108.719 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 108.719 Section 108.719... AND EQUIPMENT Miscellaneous Equipment § 108.719 Pilot boarding equipment. (a) This section applies to... vessel must have suitable pilot boarding equipment available for use on each side of the vessel. If a...

  1. 46 CFR 109.347 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 109.347 Section 109.347... OPERATIONS Operation and Stowage of Safety Equipment § 109.347 Pilot boarding equipment. (a) The master or person in charge shall ensure that pilot boarding equipment is maintained as follows: (1) The equipment...

  2. Establishment of nuclear equipment qualification system

    International Nuclear Information System (INIS)

    Joo, Po Kook; Lim, Nam Jin; Lee, Young Gun

    2003-04-01

    This study is carried out by KEARI(Korea Atomic Energy Research Institute) as the lead organization in cooperation with KIMM(Korea Institute of Machinery and Materials), KTL(Korea Testing Laboratory) and KRISS(Korea Research Institute of Standards and Science) to construct a basis of efficient management of nuclear equipment qualification business by expanding test equipment of each of participating organization, and developing qualification technologies. As for KIMM, control system of large scale shaker was replaced with advanced system, and LOCA(Loss of Coolant Accident) test facility was installed. KTL is now capable of conducting seismic tests of nuclear I and C as a result of installation of seismic test equipment during the first two project years. KRISS participated in the Project with a view to have large scale EMI test equipment and related technologies. In parallel with expansion of test equipment, a industrial-educational-research cooperation committee, as an intermediate step toward integrated equipment qualification system to maximize the usage of test equipment, was established and cooperation methods were investigated. As a result, Korea Nuclear Equipment Qualification Association, an corporate juridical person, was established. Research on development of thermal and radiation aging test technology of nuclear materials was carried out by Hanyang University and SECO(Saehan Engineering and Qualification Co., Ltd.). Integrated Equipment Qualification Database was developed which contains material test data, equipment qualification data and other EQ related informations. Standard qualification procedures were developed in order for test laboratories and manufacturers to establish design requirements and to efficiently perform tests

  3. Information technology equipment cooling system

    Science.gov (United States)

    Schultz, Mark D.

    2014-06-10

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools warm air generated by the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat from the rack of information technology equipment.

  4. Isotope-equipped measuring instruments

    International Nuclear Information System (INIS)

    Miyagawa, Kazuo; Amano, Hiroshi

    1980-01-01

    In the steel industry, though the investment in isotope-equipped measuring instruments is small as compared with that in machinery, they play important role in the moisture measurement in sintering and blast furnaces, the thickness measurement in rolling process and others in automatic control systems. The economic aspect of the isotope-equipped measuring instruments is described on the basis of the practices in Kimitsu Works of Nippon Steel Corporation: distribution of such instruments, evaluation of economic effects, usefulness evaluation in view of raising the accuracy, and usefulness evaluation viewed from the failure of the isotope instruments. The evaluation of economic effects was made under the premise that the isotope-equipped measuring instruments are not employed. Then, the effects of raising the accuracy are evaluated for a γ-ray plate thickness gauge and a neutron moisture gauge for coke in a blast furnace. Finally, the usefulness was evaluated, assuming possible failure of the isotope-equipped measuring instruments. (J.P.N.)

  5. Electronic equipment packaging technology

    CERN Document Server

    Ginsberg, Gerald L

    1992-01-01

    The last twenty years have seen major advances in the electronics industry. Perhaps the most significant aspect of these advances has been the significant role that electronic equipment plays in almost all product markets. Even though electronic equipment is used in a broad base of applications, many future applications have yet to be conceived. This versatility of electron­ ics has been brought about primarily by the significant advances that have been made in integrated circuit technology. The electronic product user is rarely aware of the integrated circuits within the equipment. However, the user is often very aware of the size, weight, mod­ ularity, maintainability, aesthetics, and human interface features of the product. In fact, these are aspects of the products that often are instrumental in deter­ mining its success or failure in the marketplace. Optimizing these and other product features is the primary role of Electronic Equipment Packaging Technology. As the electronics industry continues to pr...

  6. Improved servicing equipment for steam generators

    International Nuclear Information System (INIS)

    Hedtke, James C.

    1998-01-01

    To help keep personnel exposure as low as reasonably achievable and reduce critical path outage time, most nuclear plants of PWR design in the USA are now using improved equipment to service their steam generators (SGs) during outages. Because of the success of this equipment in the USA, two Belgian plants and one English plant have purchased this equipment, and other nuclear plants in Europe are also considering procurement. The improved SG servicing equipment discussed in this paper discusses consists of nozzle dams, segmented multi-stud tensioner, primary manway cover handling tool set, shield door and fastener cleaner. This equipment is specifically designed for the individual plant application and can also be specified for replacement SG projects. All of the equipment can be used without modification of the existing SGs. (author)

  7. Proceedings of FED remote maintenance equipment workshop

    International Nuclear Information System (INIS)

    Sager, P.; Garin, J.; Hager, E.R.; Spampinato, P.T.; Tobias, D.; Young, N.

    1981-11-01

    A workshop was convened in two sessions in January and March 1981, on the remote maintenance equipment for the Fusion Engineering Device (FED). The objectives of the first session were to familiarize the participants with the status of the design of the FED and to develop a remote maintenance equipment list for the FED. The objective of the second session was to have the participants present design concepts for the equipment which had been identified in the first session. The equipment list was developed for general purpose and special purpose equipment. The general purpose equipment was categorized as manipulators and other, while the special purpose equipment was subdivided according to the reactor subsystem it serviced: electrical, magnetic, and nuclear. Both mobile and fixed base manipulators were identified. Handling machines were identified as the major requirement for special purpose equipment

  8. Capital Equipment Replacement Decisions

    OpenAIRE

    Batterham, Robert L.; Fraser, K.I.

    1995-01-01

    This paper reviews the literature on the optimal replacement of capital equipment, especially farm machinery. It also considers the influence of taxation and capital rationing on replacement decisions. It concludes that special taxation provisions such as accelerated depreciation and investment allowances are unlikely to greatly influence farmers' capital equipment replacement decisions in Australia.

  9. Alternative Fuels Data Center: Biodiesel Equipment Options

    Science.gov (United States)

    Equipment Options to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Equipment Options on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Equipment Options on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Equipment Options on Google Bookmark Alternative Fuels

  10. 7 CFR 1753.68 - Purchasing special equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Purchasing special equipment. 1753.68 Section 1753.68... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of Special Equipment § 1753.68 Purchasing special equipment. (a) General. (1) Equipment purchases are...

  11. Lifetime of Mechanical Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Leland, K.

    1999-07-01

    The gas plant at Kaarstoe was built as part of the Statpipe gas transport system and went on stream in 1985. In 1993 another line was routed from the Sleipner field to carry condensate, and the plant was extended accordingly. Today heavy additional supply- and export lines are under construction, and the plant is extended more than ever. The main role of the factory is to separate the raw gas into commercial products and to pump or ship it to the markets. The site covers a large number of well-known mechanical equipment. This presentation deals with piping, mechanical and structural disciplines. The lifetime of mechanical equipment is often difficult to predict as it depends on many factors, and the subject is complex. Mechanical equipment has been kept in-house, which provides detailed knowledge of the stages from a new to a 14 years old plant. The production regularity has always been very high, as required. The standard of the equipment is well kept, support systems are efficient, and human improvisation is extremely valuable.

  12. Performance monitoring of safeguards equipment

    International Nuclear Information System (INIS)

    Sirisena, K.; Peltoranta, M.; Goussarov, V.; Vodrazka, P.

    1999-01-01

    SGTCS is responsible for monitoring and reporting the performance of the SG equipment. Performance monitoring (PM) has been implemented in most important safeguards equipment operating unattended in nuclear facilities. Inspectors acquire equipment performance data in facilities. After inspection, the data package is submitted to SGTCS for processing and analysis. The performance data is used for identification of systems or components, which should be changed in the field and for identification of modules which, should be diagnosed at HQ in order to determine the cause of failure. Moreover, the performance data is used for preventive maintenance and spares distribution planning, and to provide statistics for official reports and management decision making. An important part of the performance monitoring is reporting. Equipment performance reports contain information about equipment inventory, utilization, failure types, failure distribution, and reliability. Trends in performance are given in graphical form in cases, where past data is available. Reliability estimates such as expected times between failures are provided. The automated reporting tools are obtainable through EMIS database application. (author)

  13. 46 CFR 184.210 - Heating equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Heating equipment. 184.210 Section 184.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.210 Heating equipment...

  14. 40 CFR 1054.626 - What special provisions apply to equipment imported under the Transition Program for Equipment...

    Science.gov (United States)

    2010-07-01

    ... EMISSIONS FROM NEW, SMALL NONROAD SPARK-IGNITION ENGINES AND EQUIPMENT Special Compliance Provisions § 1054... provisions of this section and send us an annual report, as follows: (1) Notify the Designated Compliance... and manufacturing equipment. Companies that import equipment into the United States without meeting...

  15. 46 CFR 184.220 - Cooking equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Cooking equipment. 184.220 Section 184.220 Shipping...) VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Cooking and Heating § 184.220 Cooking equipment. (a) Doors on a cooking appliance must be provided with hinges and locking devices to prevent...

  16. 46 CFR 121.210 - Heating equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Heating equipment. 121.210 Section 121.210 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.210 Heating equipment. (a) Each heater must be so...

  17. 30 CFR 72.520 - Diesel equipment inventory.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Diesel equipment inventory. 72.520 Section 72... Mines § 72.520 Diesel equipment inventory. (a) The operator of each mine that utilizes diesel equipment underground, shall prepare and submit in writing to the District Manager, an inventory of diesel equipment...

  18. 46 CFR 117.175 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Survival craft equipment. 117.175 Section 117.175... AND ARRANGEMENTS Survival Craft Arrangements and Equipment § 117.175 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, and efficient for the purpose it...

  19. The Cost of Maintaining Educational Communications Equipment.

    Science.gov (United States)

    Humphrey, David A.

    Tentative formulas for calculating the cost of maintaining educational communications equipment are proposed. The formulas are based on a survey of campuses of the State University of New York. The survey analyzed the types of equipment to be maintained, types of maintenance, who uses the equipment, who services the equipment, and the cost…

  20. Protective equipment use among female rugby players.

    Science.gov (United States)

    Comstock, R Dawn; Fields, Sarah K; Knox, Christy L

    2005-07-01

    Our objective was to assess the prevalence of protective equipment use and the motivation for using protective equipment among a sample of US female rugby players. We surveyed a convenience sample of 234 current US female rugby players from 14 teams participating in a US women's rugby tournament, obtaining self-reported demographic, rugby exposure, and protective equipment use information. Mouthguards were the most commonly used piece of protective equipment: 90.8% of players reported having always worn a mouthguard while playing or practicing rugby within their most recent 3 months of play. Fewer than 15% of players reported having always worn other types of protective equipment. Equipment use varied by playing position. Whereas over 80% of players in all other positions always wore a mouthguard, 66.7% of scrum halves reported always wearing one. Both backs and forwards reported wearing shoulder pads, but only forwards reported always wearing padded headgear. Mouthguards, padded headgear, and shoulder pads were worn "to prevent injury," whereas ankle braces, neoprene sleeves, and athletic tape on joints were worn "to protect a current/recent injury." This is the first study of female rugby players to assess the prevalence of protective equipment use by playing position and the motivation for using protective equipment. With the exception of mouthguards, US female rugby players infrequently use protective equipment. Protective equipment use varies by playing position. Some types of protective equipment appear to be used as primary prevention mechanisms, whereas others are used as secondary or tertiary prevention mechanisms.

  1. Equipment available for automating rig operations

    International Nuclear Information System (INIS)

    McNair, W.L.

    1990-01-01

    Several manufacturers are producing automated rig equipment, from complete systems to individual functions for existing drilling rigs. Significant improvements in well site time, costs of operations, and improved drilling performance have led drilling contractors to install this equipment on their rigs. This paper details some of the equipment available for automating rigs

  2. 14 CFR 121.605 - Airplane equipment.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airplane equipment. 121.605 Section 121.605..., FLAG, AND SUPPLEMENTAL OPERATIONS Dispatching and Flight Release Rules § 121.605 Airplane equipment. No person may dispatch or release an airplane unless it is airworthy and is equipped as prescribed in § 121...

  3. Equipment Reliability Program in NPP Krsko

    International Nuclear Information System (INIS)

    Skaler, F.; Djetelic, N.

    2006-01-01

    Operation that is safe, reliable, effective and acceptable to public is the common message in a mission statement of commercial nuclear power plants (NPPs). To fulfill these goals, nuclear industry, among other areas, has to focus on: 1 Human Performance (HU) and 2 Equipment Reliability (EQ). The performance objective of HU is as follows: The behaviors of all personnel result in safe and reliable station operation. While unwanted human behaviors in operations mostly result directly in the event, the behavior flaws either in the area of maintenance or engineering usually cause decreased equipment reliability. Unsatisfied Human performance leads even the best designed power plants into significant operating events, which can be found as well-known examples in nuclear industry. Equipment reliability is today recognized as the key to success. While the human performance at most NPPs has been improving since the start of WANO / INPO / IAEA evaluations, the open energy market has forced the nuclear plants to reduce production costs and operate more reliably and effectively. The balance between these two (opposite) goals has made equipment reliability even more important for safe, reliable and efficient production. Insisting on on-line operation by ignoring some principles of safety could nowadays in a well-developed safety culture and human performance environment exceed the cost of electricity losses. In last decade the leading USA nuclear companies put a lot of effort to improve equipment reliability primarily based on INPO Equipment Reliability Program AP-913 at their NPP stations. The Equipment Reliability Program is the key program not only for safe and reliable operation, but also for the Life Cycle Management and Aging Management on the way to the nuclear power plant life extension. The purpose of Equipment Reliability process is to identify, organize, integrate and coordinate equipment reliability activities (preventive and predictive maintenance, maintenance

  4. Requirements for industrial x-ray equipment

    International Nuclear Information System (INIS)

    1987-01-01

    This safety code is concerned with the protection of all individuals who may be exposed to radiation emitted by X-ray equipment operating at energies up to 1 MeV as used in industrial radiography. This code presents basic radiation safety information for the protection of personnel operating and servicing X-ray equipment and other workers and the general public in the vicinity of areas where X-ray equipment is in operation. It specifies general safety features of design, construction and functioning of X-ray equipment and facilities; describes the responsibilities of the user, operator and maintenance personnel; contains recommendations to ensure that the X-ray equipment is used and maintained in accordance with the ALARA principle; and describes a program of personnel monitoring and radiation safety surveys. ( 6 refs., 5 tabs., 4 figs.)

  5. 30 CFR 250.602 - Equipment movement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Equipment movement. 250.602 Section 250.602... OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Workover Operations § 250.602 Equipment movement. The movement of well-workover rigs and related equipment on and off a platform or from well to well on...

  6. 30 CFR 250.502 - Equipment movement.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Equipment movement. 250.502 Section 250.502... OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Well-Completion Operations § 250.502 Equipment movement. The movement of well-completion rigs and related equipment on and off a platform or from well to well...

  7. 46 CFR 121.220 - Cooking equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Cooking equipment. 121.220 Section 121.220 Shipping... SYSTEMS AND EQUIPMENT Cooking and Heating § 121.220 Cooking equipment. (a) Doors on a cooking appliance... cooking appliance must be installed to prevent movement in heavy seas. (c) For a grill or similar type of...

  8. Californium-252 Program Equipment Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Chattin, Fred Rhea [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Wilson, Kenton [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ezold, Julie G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-12-01

    To successfully continue the 252Cf production and meet the needs of the customers, a comprehensive evaluation of the Building 7920 processing equipment was requested to identify equipment critical to the operational continuity of the program.

  9. After-hours Power Status of Office Equipment and Inventory of Miscellaneous Plug-load Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, Judy A.; Webber, Carrie A.; McWhinney, Marla C.; Brown, Richard E.; Pinckard, Margaret J.; Busch, John F.

    2004-01-22

    This research was conducted in support of two branches of the EPA ENERGY STAR program, whose overall goal is to reduce, through voluntary market-based means, the amount of carbon dioxide emitted in the U.S. The primary objective was to collect data for the ENERGY STAR Office Equipment program on the after-hours power state of computers, monitors, printers, copiers, scanners, fax machines, and multi-function devices. We also collected data for the ENERGY STAR Commercial Buildings branch on the types and amounts of ''miscellaneous'' plug-load equipment, a significant and growing end use that is not usually accounted for by building energy managers. This data set is the first of its kind that we know of, and is an important first step in characterizing miscellaneous plug loads in commercial buildings. The main purpose of this study is to supplement and update previous data we collected on the extent to which electronic office equipment is turned off or automatically enters a low power state when not in active use. In addition, it provides data on numbers and types of office equipment, and helps identify trends in office equipment usage patterns. These data improve our estimates of typical unit energy consumption and savings for each equipment type, and enables the ENERGY STAR Office Equipment program to focus future effort on products with the highest energy savings potential. This study expands our previous sample of office buildings in California and Washington DC to include education and health care facilities, and buildings in other states. We report data from twelve commercial buildings in California, Georgia, and Pennsylvania: two health care buildings, two large offices (> 500 employees each), three medium offices (50-500 employees), four education buildings, and one ''small office'' that is actually an aggregate of five small businesses. Two buildings are in the San Francisco Bay area of California, five are in

  10. AVM branch vibration test equipment

    International Nuclear Information System (INIS)

    Anne, J.P.

    1995-01-01

    An inventory of the test equipment of the AVM Branch ''Acoustic and Vibratory Mechanics Analysis Methods'' group has been undertaken. The purpose of this inventory is to enable better acquaintance with the technical characteristics of the equipment, providing an accurate definition of their functionalities, ad to inform potential users of the possibilities and equipment available in this field. The report first summarizes the various experimental surveys conduced. Then, using the AVM equipment database to draw up an exhaustive list of available equipment, it provides a full-scope picture of the vibration measurement systems (sensors, conditioners and exciters) and data processing resources commonly used on industrial sites and in laboratories. A definition is also given of a mobile test unit, called 'shelter', and a test bench used for the testing and performance rating of the experimental analysis methods developed by the group. The report concludes with a description of two fixed installations: - the calibration bench ensuring the requisite quality level for the vibration measurement systems ; - the training bench, whereby know-how acquired in the field in the field of measurement and experimental analysis processes is made available to others. (author). 27 refs., 15 figs., 2 appends

  11. Quality assurance for radiodiagnostic equipment in Uruguay

    International Nuclear Information System (INIS)

    Cotelo, Elena D.

    2001-01-01

    Since Uruguay did not have an study on X-ray equipment, students of Radiation Protection course (RP) made this field work throughout the country. The objective is to obtain information on the number and kind of X-ray radiodiagnostic equipment. Some of the results are: there are 666 radiodiagnostic equipment. The ratio of population to equipment is 4.515 to 1 in the capital and the mean rate in the rest of the country is 4.383 to one, with a minimum of 1.707 and a maximum of 8.220. The Public Health Ministry (MSP) and the Instituciones de Asistencia Medica Colectiva (a kind of private heath assurance) (IAMC) have less equipment in the capital than in the rest of the country. The 37% of the capital population receives assistance through the IAMC , with a 42.5 % of the equipment. Uruguay except the capital has 18 districts and 17 computed tomography equipment, from which only 3 belong to the MSP. Five districts do not have any. In Montevideo, there are 11.500 females over forty years of age per X-ray mammography equipment, and this relation in the rest of the country is 13.900. There are 21 X-ray Interventional radiology equipment, 16 of them are in the capital. Is from relating the radiodiagnostic equipment, the population and the procedures, that quality assistance indicators emerge. This owns high importance on the way to create a RP National Programme. (author)

  12. TRANSPORT AND EMPLACEMENT EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) Transport and Emplacement in the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. The Transport and Emplacement equipment described in this document consists of the following: (1) WP Transporter; (2) Reusable Rail Car; (3) Emplacement Gantry; (4) Gantry Carrier; and (5) Transport Locomotive

  13. Plant-wide integrated equipment monitoring and analysis system

    International Nuclear Information System (INIS)

    Morimoto, C.N.; Hunter, T.A.; Chiang, S.C.

    2004-01-01

    A nuclear power plant equipment monitoring system monitors plant equipment and reports deteriorating equipment conditions. The more advanced equipment monitoring systems can also provide information for understanding the symptoms and diagnosing the root cause of a problem. Maximizing the equipment availability and minimizing or eliminating consequential damages are the ultimate goals of equipment monitoring systems. GE Integrated Equipment Monitoring System (GEIEMS) is designed as an integrated intelligent monitoring and analysis system for plant-wide application for BWR plants. This approach reduces system maintenance efforts and equipment monitoring costs and provides information for integrated planning. This paper describes GEIEMS and how the current system is being upgraded to meet General Electric's vision for plant-wide decision support. (author)

  14. Sample-related peripheral equipment at IPNS

    International Nuclear Information System (INIS)

    Bohringer, D.E.; Crawford, R.K.

    1985-01-01

    This paper describes samples environment equipment provided by IPNS to visiting users and staff scientists. Of the twelve horizontal neutron beam stations, (ten now operational, two under construction) all use one or more form of such support equipment. An in-house support group devotes a significant fraction of its time to development, calibration, and maintenance of this equipment

  15. Charging equipment. Ladegeraet

    Energy Technology Data Exchange (ETDEWEB)

    Neumann, E

    1981-09-17

    The invention refers to a charging equipment, particularly on board charging equipment for charging traction batteries of an electric vehicle from the AC mains supply, consisting of a DC converter, which contains a controlled power transistor, a switching off unloading circuit and a power transmitter, where the secondary winding is connected in series with a rectifier diode, and a smoothing capacitor is connected in parallel with this series circuit. A converter module is provided, which consists of two DC voltage converters, whose power transistors are controlled by a control circuit in opposition with a phase displacement of 180/sup 0/.

  16. 7 CFR 58.229 - Filler and packaging equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Filler and packaging equipment. 58.229 Section 58.229....229 Filler and packaging equipment. All filling and packaging equipment shall be of sanitary... equipment should comply with the 3-A Sanitary Standards for equipment for Packaging Dry Milk and Dry Milk...

  17. WP EMPLACEMENT CONTROL AND COMMUNICATION EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    Raczka, N.T.

    1997-01-01

    The objective and scope of this document are to list and briefly describe the major control and communication equipment necessary for waste package emplacement at the proposed nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the required equipment are explained and summarized in the individual subsections of this document. This task was evaluated in accordance with QAP-2-0 and found not to be quality affecting. Therefore, this document was prepared in accordance with NAP-MG-012. The following control and communication equipment are addressed in this document: (1) Programmable Logic Controllers (PLC's); (2) Leaky Feeder Radio Frequency Communication Equipment; (3) Slotted Microwave guide Communication Equipment; (4) Vision Systems; (5) Radio Control Equipment; and (6) Enclosure Cooling Systems

  18. Automatic monitoring of vibration welding equipment

    Science.gov (United States)

    Spicer, John Patrick; Chakraborty, Debejyo; Wincek, Michael Anthony; Wang, Hui; Abell, Jeffrey A; Bracey, Jennifer; Cai, Wayne W

    2014-10-14

    A vibration welding system includes vibration welding equipment having a welding horn and anvil, a host device, a check station, and a robot. The robot moves the horn and anvil via an arm to the check station. Sensors, e.g., temperature sensors, are positioned with respect to the welding equipment. Additional sensors are positioned with respect to the check station, including a pressure-sensitive array. The host device, which monitors a condition of the welding equipment, measures signals via the sensors positioned with respect to the welding equipment when the horn is actively forming a weld. The robot moves the horn and anvil to the check station, activates the check station sensors at the check station, and determines a condition of the welding equipment by processing the received signals. Acoustic, force, temperature, displacement, amplitude, and/or attitude/gyroscopic sensors may be used.

  19. Changing nature of equipment and parts qualification

    International Nuclear Information System (INIS)

    Bucci, R.M.

    1988-01-01

    Ideally, the original supplier of a piece of nuclear safety-related equipment has performed a qualification program and will continue to support that equipment throughout the lifetime of the nuclear power plants in which in equipment is installed. The supplier's nuclear quality assurance program will be maintained and he will continue to offer all necessary replacement parts. These parts will be identical to the original parts, certified to the original purchase order requirements, and the parts will be offered at competitive prices. Due to the changing nature of the nuclear plant equipment market, however, one or more of those ideal features are frequently unavailable when safety-related replacement equipment or parts are required. Thus, the process of equipment and parts qualification has had to adjust in order to ensure obtaining qualified replacements when needed. This paper presents some new directions taken in the qualification of replacement equipment and parts to meet changes in the marketplace

  20. Special equipment for etching nitrocellulose film

    International Nuclear Information System (INIS)

    Domanus, J.C.

    1983-08-01

    Nitrocellulose film and converter screens used for neutron radiography are described. Difficulties in visualization of radiographs on those films are mentioned. Because there is no equipment for etching nitrocellulose film available on the market Risoe has designed and produced such equipment at an estimated cost of Dkr. 15,000. Design criteria for this equipment are given and its performance described

  1. An on-line monitoring system for navigation equipment

    Science.gov (United States)

    Wang, Bo; Yang, Ping; Liu, Jing; Yang, Zhengbo; Liang, Fei

    2017-10-01

    Civil air navigation equipment is the most important infrastructure of Civil Aviation, which is closely related to flight safety. In addition to regular flight inspection, navigation equipment's patrol measuring, maintenance measuring, running measuring under special weather conditions are the important means of ensuring aviation flight safety. According to the safety maintenance requirements of Civil Aviation Air Traffic Control navigation equipment, this paper developed one on-line monitoring system with independent intellectual property rights for navigation equipment, the system breakthroughs the key technologies of measuring navigation equipment on-line including Instrument Landing System (ILS) and VHF Omni-directional Range (VOR), which also meets the requirements of navigation equipment ground measurement set by the ICAO DOC 8071, it provides technical means of the ground on-line measurement for navigation equipment, improves the safety of navigation equipment operation, and reduces the impact of measuring navigation equipment on airport operation.

  2. 7 CFR 550.38 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) AGRICULTURAL RESEARCH SERVICE, DEPARTMENT OF AGRICULTURE GENERAL ADMINISTRATIVE POLICY FOR NON-ASSISTANCE COOPERATIVE AGREEMENTS Management of Agreements... Agency, the Cooperator shall use the equipment to be replaced as trade-in or sell the equipment and use...

  3. 46 CFR 77.40-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Pilot boarding equipment. 77.40-1 Section 77.40-1... MISCELLANEOUS SYSTEMS AND EQUIPMENT Pilot Boarding Equipment § 77.40-1 Pilot boarding equipment. (a) This... vessel. (b) Each vessel must have suitable pilot boarding equipment available for use on each side of the...

  4. Operation monitor for plant equipment

    International Nuclear Information System (INIS)

    Kondo, Tetsufumi; Kanemoto, Shigeru.

    1991-01-01

    In a nuclear power plant, states of each of equipment in the plant are monitored accurately even under such a operation condition that the power is changed. That is, the fundamental idea is based on a model comparison method. A deviation between an output signal upon normal plant state obtained in a forecasting model device and that of the objective equipment in the plant are compared with a predetermined value. The result of the comparison is inputted to an alarm device to alarm the abnormality of the states of the equipment to an operator. The device of the present invention thus constituted can monitor the abnormality of the operation of equipment accurately even under such a condition that a power level fluctuates. As a result, it can remarkably contribute to mitigate operator's monitoring operation under the condition such as during load following operation. (I.S.)

  5. Procurement strategic analysis of nuclear safety equipment

    International Nuclear Information System (INIS)

    Wu Caixia; Yang Haifeng; Li Xiaoyang; Li Shixin

    2013-01-01

    The nuclear power development plan in China puts forward a challenge on procurement of nuclear safety equipment. Based on the characteristics of the procurement of nuclear safety equipment, requirements are raised for procurement process, including further clarification of equipment technical specification, establishment and improvement of the expert database of the nuclear power industry, adoption of more reasonable evaluation method and establishment of a unified platform for nuclear power plants to procure nuclear safety equipment. This paper makes recommendation of procurement strategy for nuclear power production enterprises from following aspects, making a plan of procurement progress, dividing procurement packages rationally, establishing supplier database through qualification review and implementing classified management, promoting localization process of key equipment continually and further improving the system and mechanism of procurement of nuclear safety equipment. (authors)

  6. Equipment qualification research program: program plan

    International Nuclear Information System (INIS)

    Dong, R.G.; Smith, P.D.

    1982-01-01

    The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump

  7. Weight/balance portable test equipment

    International Nuclear Information System (INIS)

    Whitlock, R.W.

    1994-01-01

    This document shows the general layout, and gives a part description for the weight/balance test equipment. This equipment will aid in the regulation of the leachate loading of tanker trucks. The report contains four drawings with part specifications. The leachate originates from lined trenches

  8. Food Service Equipment and Appurtenances.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI.

    Equipment design specifications are presented relating to tables of all kinds, counters, sinks and drainboards, bins, shelves, drawers, hoods and similar kitchen appurtenances, not including baking, roasting, toasting, broiling or frying equipment, food preparation machinery such as slicers, choppers, and cutters, mixers and grinders, steam…

  9. Case Based Asset Maintenance for the Electric Equipment

    International Nuclear Information System (INIS)

    Kim, Ji-Hyeon; Jung, Jae-Cheon; Chang, Young-Woo; Chang, Hoon-Seon; Kim, Jae-Cheol; Kim, Hang-Bae; Kim, Kyu-Ho; Hur, Yong; Lee, Dong-Chul

    2006-01-01

    The electric equipment maintenance strategies are changing from PM(Preventive Maintenance) or CM(Corrective Maintenance) to CBM(Condition Based Maintenance). The main benefits of CBM are reduced possibility of service failures of critical equipment and reduced costs or maintenance work. In CBM, the equipment status need to be monitored continuously and a decision should be made whether an equipment need to be repaired or replaced. For the maintenance decision making, the CBR(Case Base Reasoning) system is introduced. The CBR system receives the current equipment status and retrieves the case based historic database to determine any possible equipment failure under current conditions. In retrieving the case based historic data, the suggested DSS(Decision Support System) uses a reasoning engine with an equipment/asset ontology that describes the equipment subsumption relationships

  10. Containment and Surveillance Equipment Compendium

    International Nuclear Information System (INIS)

    Luetters, F.O.

    1980-02-01

    The Containment and Surveillance Equipment Compendium contains information sections describing the application and status of seals, optical surveillance systems, and monitors for international safeguards systems. The Compendium is a collection of information on equipment in use (generally by the IAEA) or under development in the US in diverse programs being conducted at numerous facilities under different sponsors. The Compendium establishes a baseline for the status and applications of C/S equipment and is a tool to assist in the planning of future C/S hardware development activities. The Appendix contains design concepts which can be developed to meet future goals

  11. Automatic dose-rate controlling equipment

    International Nuclear Information System (INIS)

    Szasz, T.; Nagy Czirok, Cs.; Batki, L.; Antal, S.

    1977-01-01

    The patent of a dose-rate controlling equipment that can be attached to X-ray image-amplifiers is presented. In the new equipment the current of the photocatode of the image-amplifier is led into the regulating unit, which controls the X-ray generator automatically. The advantages of the equipment are the following: it can be simply attached to any type of X-ray image-amplifier, it accomplishes fast and sensitive regulation, it makes possible the control of both the mA and the kV values, it is attached to the most reliable point of the image-transmission chain. (L.E.)

  12. A complex method of equipment replacement planning. An advanced plan for the replacement of medical equipment.

    Science.gov (United States)

    Dondelinger, Robert M

    2004-01-01

    This complex method of equipment replacement planning is a methodology; it is a means to an end, a process that focuses on equipment most in need of replacement, rather than the end itself. It uses data available from the maintenance management database, and attempts to quantify those subjective items important [figure: see text] in making equipment replacement decisions. Like the simple method of the last issue, it is a starting point--albeit an advanced starting point--which the user can modify to fit their particular organization, but the complex method leaves room for expansion. It is based on sound logic, documented facts, and is fully defensible during the decision-making process and will serve your organization well as provide a structure for your equipment replacement planning decisions.

  13. After-hours power status of office equipment and energy use of miscellaneous plug-load equipment

    Energy Technology Data Exchange (ETDEWEB)

    Roberson, Judy A.; Webber, Carrie A.; McWhinney, Marla C.; Brown, Richard E.; Pinckard, Marageret J.; Busch, John F.

    2004-05-27

    This research was conducted in support of two branches of the EPA ENERGY STAR program, whose overall goal is to reduce, through voluntary market-based means, the amount of carbon dioxide emitted in the U.S. The primary objective was to collect data for the ENERGY STAR Office Equipment program on the after-hours power state of computers, monitors, printers, copiers, scanners, fax machines, and multi-function devices. We also collected data for the ENERGY STAR Commercial Buildings branch on the types and amounts of miscellaneous plug-load equipment, a significant and growing end use that is not usually accounted for by building energy managers. For most types of miscellaneous equipment, we also estimated typical unit energy consumption in order to estimate total energy consumption of the miscellaneous devices within our sample. This data set is the first of its kind that we know of, and is an important first step in characterizing miscellaneous plug loads in commercial buildings. The main purpose of this study is to supplement and update previous data we collected on the extent to which electronic office equipment is turned off or automatically enters a low power state when not in active use. In addition, it provides data on numbers and types of office equipment, and helps identify trends in office equipment usage patterns. These data improve our estimates of typical unit energy consumption and savings for each equipment type, and enables the ENERGY STAR Office Equipment program to focus future effort on products with the highest energy savings potential. This study expands our previous sample of office buildings in California and Washington DC to include education and health care facilities, and buildings in other states. We report data from sixteen commercial buildings in California, Georgia, and Pennsylvania: four education buildings, two medical buildings, two large offices (> 500 employees each), three medium offices (50-500 employees each), and five small

  14. Inert Reassessment Document for Ethylene Glycol

    Science.gov (United States)

    Ethylene Glycol has many uses and are also used as antifreeze and deicers, as solvents, humectants, as chemical intermediates in the synthesis of other chemicals, and as components of many products such as brake fluids, lubricants, inks,and lacquers.

  15. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  16. Origins of eponymous orthopaedic equipment.

    Science.gov (United States)

    Meals, Clifton; Wang, Jeffrey

    2010-06-01

    Orthopaedists make great use of eponymous equipment, however the origins of these tools are unknown to many users. This history enriches, enlightens, and enhances surgical education, and may inspire modern innovation. We explored the origins of common and eponymous orthopaedic equipment. We selected pieces of equipment named for their inventors and in the broadest use by modern orthopaedists. We do not describe specialized orthopaedic implants and instruments owing to the overwhelming number of these devices. The history of this equipment reflects the coevolution of orthopaedics and battlefield medicine. Additionally, these stories evidence the primacy of elegant design and suggest that innovation is often a process of revision and refinement rather than sudden inspiration. Their history exposes surgical innovators as brilliant, lucky, hardworking, and sometimes odd. These stories amuse, enlighten, and may inspire modern orthopaedists to develop creative solutions of their own. The rich history of the field's eponymous instruments informs an ongoing tradition of innovation in orthopaedics.

  17. Progress on EPRI electrical equipment qualification research

    International Nuclear Information System (INIS)

    Sliter, G.E.

    1983-01-01

    The objective of EPRI's electrical equipment qualification research program is to provide technical assistance to utilities in meeting nuclear plant safety requirements in a manner consistent with the state of the art. This paper reports progress on several research projects including: radiation effects studies, which compile data on degradation of organic materials in electrical equipment exposed to operational and accident radiation doses; the Equipment Qualification Data Bank, which is a remotely accessible computer system for disseminating qualification information on in-plant equipment, seismic data, and materials data; an aging/seismic correlation program, which is providing test data showing that, in many cases, age degradation has a negligibly small effect on the performance of electrical components under seismic excitation; a review of condition monitoring techniques, which has identified surveillance methods for measuring key performance parameters that have the potential for predicting remaining equipment life; and large-scale hydrogen burn equipment response tests, which are providing data to assess the ability of equipment to remain functional during and after hydrogen burning in postulated degraded core accidents

  18. 78 FR 25916 - Authorization of Radiofrequency Equipment

    Science.gov (United States)

    2013-05-03

    ...] Authorization of Radiofrequency Equipment AGENCY: Federal Communications Commission. ACTION: Proposed rule... bodies, and measurement procedures used to determine RF equipment compliance. The Commission believes... Commission is responsible for an equipment authorization program for radiofrequency (RF) devices under part 2...

  19. Diagnostic imaging and radiation therapy equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-05-01

    This is the third edition of CSA Standard C22.2 No. 114 (now CAN/CSA-C22.2 No. 114), which is one of a series of standards issued by the Canadian Standards Association under Part II of the Canadian Electrical Code. This edition marks an important shift towards harmonization of Canadian requirements with those of the European community and the United States. Also important to this edition is the expansion of its scope to include the complete range of diagnostic imaging and radiation therapy equipment, rather than solely radiation-emitting equipment. In so doing, equipment previously addressed by CSA Standard C22.2 No. 125, Electromedical Equipment, specifically lasers for medical applications and diagnostic ultrasound units, is now dealt with in the new edition. By virtue of this expanded scope, many of the technical requirements in the electromedical equipment standard have been introduced to the new edition, thereby bringing CSA Standard C22.2 No. 114 up to date. 14 tabs., 16 figs.

  20. Diagnostic imaging and radiation therapy equipment

    International Nuclear Information System (INIS)

    1990-05-01

    This is the third edition of CSA Standard C22.2 No. 114 (now CAN/CSA-C22.2 No. 114), which is one of a series of standards issued by the Canadian Standards Association under Part II of the Canadian Electrical Code. This edition marks an important shift towards harmonization of Canadian requirements with those of the European community and the United States. Also important to this edition is the expansion of its scope to include the complete range of diagnostic imaging and radiation therapy equipment, rather than solely radiation-emitting equipment. In so doing, equipment previously addressed by CSA Standard C22.2 No. 125, Electromedical Equipment, specifically lasers for medical applications and diagnostic ultrasound units, is now dealt with in the new edition. By virtue of this expanded scope, many of the technical requirements in the electromedical equipment standard have been introduced to the new edition, thereby bringing CSA Standard C22.2 No. 114 up to date. 14 tabs., 16 figs

  1. 30 CFR 75.524 - Electric face equipment; electric equipment used in return air outby the last open crosscut...

    Science.gov (United States)

    2010-07-01

    ... used in return air outby the last open crosscut; maximum level of alternating or direct electric... other in return air outby the last open crosscut, shall not exceed one ampere as determined from the... Electrical Equipment-General § 75.524 Electric face equipment; electric equipment used in return air outby...

  2. 21 CFR 606.60 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 7 2010-04-01 2010-04-01 false Equipment. 606.60 Section 606.60 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) BIOLOGICS CURRENT... following frequency, include but are not limited to: Equipment Performance check Frequency Frequency of...

  3. Chloride dynamics in a restored urban stream and the influence of road salts on water quality

    Science.gov (United States)

    Understanding the connection between road salts and water quality is essential to assess the implications for human health and ecosystem services from these widely used de-icers. Preliminary analysis identified a probable connection between road salt application and a stream wat...

  4. 48 CFR 870.115 - Food service equipment.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Food service equipment... DEPARTMENT SUPPLEMENTARY REGULATIONS SPECIAL PROCUREMENT CONTROLS Controls 870.115 Food service equipment. (a) All new food service equipment purchased for Dietetic Service through other than Defense General...

  5. Diagnostic x-ray equipment and its use

    International Nuclear Information System (INIS)

    1993-01-01

    The guide contains the requirements for the use, structure and operation of diagnostic x-ray equipment necessary to ensure the radiation safety of workers and patients. The guide is intended for the party responsible for operating the x-ray units, the staff operating, installing and maintaining x-ray examination equipment, and companies manufacturing and selling such equipment. Special requirements for mammographic and dental x-ray equipments are given in separate ST guides. (5 refs., 1 figs., 2 tabs.)

  6. Connected Equipment Maturity Model Version 1.0

    Energy Technology Data Exchange (ETDEWEB)

    Butzbaugh, Joshua B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mayhorn, Ebony T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Sullivan, Greg [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Whalen, Scott A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-05-01

    The Connected Equipment Maturity Model (CEMM) evaluates the high-level functionality and characteristics that enable equipment to provide the four categories of energy-related services through communication with other entities (e.g., equipment, third parties, utilities, and users). The CEMM will help the U.S. Department of Energy, industry, energy efficiency organizations, and research institutions benchmark the current state of connected equipment and identify capabilities that may be attained to reach a more advanced, future state.

  7. Analysis of bacterial contamination on surface of general radiography equipment and CT equipment in emergency room of radiology

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Dong Hee; KIm, Hyeong Gyun [Dept. of Radiological Science, Far East University, Eumseong (Korea, Republic of)

    2016-09-15

    We aim to offer basic materials about infection management through conducting bacterial contamination test about general radiography equipment and CT equipment installed in ER of three general hospitals with 100 sickbeds or more located in Gyeongsangbuk-do Province, and suggest management plan. It had been conducted from 1st December 2015 to 31st December, and objects were general radiography equipment and CT equipment of emergency room located in Gyeongsangbuk-do Province. For general radiography equipment, sources were collected from 4 places such as upper side of control box which employees use most, upper side of exposure button, whole upper side of table which is touching part of patient's skin, upper side of stand bucky's grid, and where patients put their jaws on. For CT equipment, sources were collected from 3 places such as upper side of control box which radiography room employees use most, X-ray exposure button, whole upper side of table which is touching part of patient's skin, and gantry inner. Surface contamination strain found at general radiography equipment in emergency room of radiology are Providencia stuartii(25%), Stenotrophomonas maltophilia(18%), Enterobacter cloacae(8%), Pseudomonas species(8%), Staphylococcus epidermidis(8%), Gram negative bacilli(8%), and ungrown bacteria at incubator after 48 hours of incubation (67%) which is the biggest. Most bacteria were found at upper side of stand bucky-grid and stand bucky of radiology's general radiography equipment, and most sources of CT equipment were focused at patient table, which means it is contaminated by patients who have various diseases, and patients who have strains with decreased immunity may get severe diseases. Thus infection prevention should be made through 70% alcohol disinfection at both before test and after test.

  8. Analysis of bacterial contamination on surface of general radiography equipment and CT equipment in emergency room of radiology

    International Nuclear Information System (INIS)

    Hong, Dong Hee; KIm, Hyeong Gyun

    2016-01-01

    We aim to offer basic materials about infection management through conducting bacterial contamination test about general radiography equipment and CT equipment installed in ER of three general hospitals with 100 sickbeds or more located in Gyeongsangbuk-do Province, and suggest management plan. It had been conducted from 1st December 2015 to 31st December, and objects were general radiography equipment and CT equipment of emergency room located in Gyeongsangbuk-do Province. For general radiography equipment, sources were collected from 4 places such as upper side of control box which employees use most, upper side of exposure button, whole upper side of table which is touching part of patient's skin, upper side of stand bucky's grid, and where patients put their jaws on. For CT equipment, sources were collected from 3 places such as upper side of control box which radiography room employees use most, X-ray exposure button, whole upper side of table which is touching part of patient's skin, and gantry inner. Surface contamination strain found at general radiography equipment in emergency room of radiology are Providencia stuartii(25%), Stenotrophomonas maltophilia(18%), Enterobacter cloacae(8%), Pseudomonas species(8%), Staphylococcus epidermidis(8%), Gram negative bacilli(8%), and ungrown bacteria at incubator after 48 hours of incubation (67%) which is the biggest. Most bacteria were found at upper side of stand bucky-grid and stand bucky of radiology's general radiography equipment, and most sources of CT equipment were focused at patient table, which means it is contaminated by patients who have various diseases, and patients who have strains with decreased immunity may get severe diseases. Thus infection prevention should be made through 70% alcohol disinfection at both before test and after test

  9. 7 CFR 3015.169 - Equipment management requirements.

    Science.gov (United States)

    2010-01-01

    ... following requirements (including replacement equipment) until such actions as transfer, replacement or... transfer, replacement, or disposal of the equipment. (b) Every two years, at a minimum, a physical... 7 Agriculture 15 2010-01-01 2010-01-01 false Equipment management requirements. 3015.169 Section...

  10. Future development of IR thermovision weather satellite equipment

    Science.gov (United States)

    Listratov, A. V.

    1974-01-01

    The self radiation of the surface being viewed is used for image synthesis in IR thermovision equipment. The installation of such equipment aboard weather satellites makes it possible to obtain cloud cover pictures of the earth's surface in a complete orbit, regardless of the illumination conditions, and also provides quantitative information on the underlying surface temperature and cloud top height. Such equipment is used successfully aboard the Soviet satellites of the Meteor system, and experimentally on the American satellites of the Nimbus series. With regard to surface resolution, the present-day IR weather satellite equipment is inferior to the television equipment. This is due primarily to the comparatively low detectivity of the IR detectors used. While IR equipment has several fundamental advantages in comparison with the conventional television equipment, the problem arises of determining the possibility for future development of weather satellite IR thermovision equipment. Criteria are examined for evaluating the quality of IR.

  11. Special Equipment and/or Devices.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI.

    This standard covers the sanitation requirements for equipment and/or devices used in the storage, preparation, or handling of foods and beverages. The National Sanitation Foundation's basic criteria for the evaluation of special equipment and/or devices has been prepared to fulfill several specific needs, its major function being to serve as a…

  12. Electrical and control equipment in nuclear power plants. Problems when replacing aging equipment

    International Nuclear Information System (INIS)

    Nordling, Anna; Haakansson, Goeran

    2012-01-01

    Interoperability between different technical systems is more complicated when old and new technology meet, such as between analog and digital technology. New electrical and I and C equipment is selected with consideration to simplify and improve the compatibility and interoperability. The original construction of nuclear power plants with electricity and I and C equipment had more natural interfaces. Generally experienced guidance, to the management of interoperability and interfaces, feels insufficient. Skills transfer programs are identified as a major need, as more and more important personnel are retiring and important information is lost with them. Lack of appropriate skills directly affects the ability to produce accurate and complete requirements specification. Failure modes of newer electrical and I and C equipment are perceived as more complex than the older equipment. When choosing equipment, attempts are made to minimize unnecessary features, to reduce the number of potential failure modes. There is a lack of consistent understanding of the meaning of robustness in electrical technology and I and C technology, in the nuclear plant engineering departments. The overall picture is that the robustness has worsened since the facilities were built. The Swedish nuclear power plants have an internal organizational structure with separated client and support organization. This splits the nuclear organization into two distinct parts which threaten to separate the two entities focus. Engineering departments at the Swedish nuclear power plants express a need for increased expertise in the client organization (blocks). Competence requested is for example, system knowledge to facilitate and enhance the quality of the initial analysis performed in the blocks. Suppliers receive more recently larger turnkey projects, both to minimize costs but also to minimize the interfaces and co-function problems. This, however, heightens demands for knowledge transfer between

  13. X-ray equipment

    International Nuclear Information System (INIS)

    Redmayne, I.G.B.

    1988-01-01

    The patent concerns a warning and protection system for mobile x-ray equipment used for 'on site' radiography, so that workers in the vicinity of such a working unit can be alerted to its presence. The invention is a local repeater warning system which gives a preliminary warning that energisation of the tubehead is imminent, as well as a switch near the tubehead to abort or inhibit energisation. The latter switch allows personnel caught in the vicinity of the tubehead to prevent energisation. The preliminary warning may be flashing lamps or by a klaxon. The control unit for the equipment may include a monitoring circuit to detect failure of the warning light or klaxon. (U.K.)

  14. X-ray equipment

    Energy Technology Data Exchange (ETDEWEB)

    Redmayne, I.G.B.

    1988-01-06

    The patent concerns a warning and protection system for mobile x-ray equipment used for 'on site' radiography, so that workers in the vicinity of such a working unit can be alerted to its presence. The invention is a local repeater warning system which gives a preliminary warning that energisation of the tubehead is imminent, as well as a switch near the tubehead to abort or inhibit energisation. The latter switch allows personnel caught in the vicinity of the tubehead to prevent energisation. The preliminary warning may be flashing lamps or by a klaxon. The control unit for the equipment may include a monitoring circuit to detect failure of the warning light or klaxon. (U.K.).

  15. Equipment cost optimization

    International Nuclear Information System (INIS)

    Ribeiro, E.M.; Farias, M.A.; Dreyer, S.R.B.

    1995-01-01

    Considering the importance of the cost of material and equipment in the overall cost profile of an oil company, which in the case of Petrobras, represents approximately 23% of the total operational cost or 10% of the sales, an organization for the optimization of such costs has been established within Petrobras. Programs are developed aiming at: optimization of life-cycle cost of material and equipment; optimization of industrial processes costs through material development. This paper describes the methodology used in the management of the development programs and presents some examples of concluded and ongoing programs, which are conducted in permanent cooperation with suppliers, technical laboratories and research institutions and have been showing relevant results

  16. 7 CFR 550.39 - Equipment replacement insurance.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Equipment replacement insurance. 550.39 Section 550.39... Agreements Equipment/property Standards § 550.39 Equipment replacement insurance. If required by the terms and conditions of the award, the Cooperator shall provide adequate insurance coverage for replacement...

  17. 47 CFR 76.1621 - Equipment compatibility offer.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Equipment compatibility offer. 76.1621 Section... MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Notices § 76.1621 Equipment compatibility offer. Cable system... offer to supply each subscriber with special equipment that will enable the simultaneous reception of...

  18. 45 CFR 95.707 - Equipment management and disposition.

    Science.gov (United States)

    2010-10-01

    ... participation in the costs of replacement equipment shall be limited to the additional outlay. (4) If the... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment management and disposition. 95.707... PROGRAMS) Equipment Acquired Under Public Assistance Programs § 95.707 Equipment management and disposition...

  19. 14 CFR 25.1441 - Oxygen equipment and supply.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Oxygen equipment and supply. 25.1441... Oxygen equipment and supply. (a) If certification with supplemental oxygen equipment is requested, the... oxygen available in each source of supply. (d) The oxygen flow rate and the oxygen equipment for...

  20. 47 CFR 36.126 - Circuit equipment-Category 4.

    Science.gov (United States)

    2010-10-01

    ... separating property associated with special services, circuit equipment included in Categories 4.12 (other... Equipment Excluding Wideband—Category 4.13—The cost of Circuit Equipment associated with exchange line plant... 47 Telecommunication 2 2010-10-01 2010-10-01 false Circuit equipment-Category 4. 36.126 Section 36...

  1. 49 CFR 238.230 - Safety appliances-new equipment.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Safety appliances-new equipment. 238.230 Section... I Passenger Equipment § 238.230 Safety appliances—new equipment. (a) Applicability. This section..., 2007, that is equipped with a safety appliance, required by the “manner of application” provisions in...

  2. Hot conditioning equipment conceptual design report

    International Nuclear Information System (INIS)

    Bradshaw, F.W.

    1996-01-01

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage

  3. Hot conditioning equipment conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    Bradshaw, F.W., Westinghouse Hanford

    1996-08-06

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage.

  4. Practical approaches to implementing facility wide equipment strengthening programs

    International Nuclear Information System (INIS)

    Kincaid, R.H.; Smietana, E.A.

    1989-01-01

    Equipment strengthening programs typically focus on components required to ensure operability of safety related equipment or to prevent the release of toxic substances. Survival of non-safety related equipment may also be crucial to ensure rapid recovery and minimize business interruption losses. Implementing a strengthening program for non-safety related equipment can be difficult due to the large amounts of equipment involved and limited budget availability. EQE has successfully implemented comprehensive equipment strengthening programs for a number of California corporations. Many of the lessons learned from these projects are applicable to DOE facilities. These include techniques for prioritizing equipment and three general methodologies for anchoring equipment. Pros and cons of each anchorage approach are presented along with typical equipment strengthening costs

  5. Mine railway equipments management information system

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, X.; Han, K.; Duan, T.; Liu, Z.; Lu, H. [China University of Mining and Technology, Xuzhou (China)

    2007-06-15

    Based on client/server and browser/server models, the management information system described realized the entire life-cycle management of mine railway equipment which included universal equipment and special equipment in the locomotive depot, track maintenance division, electrical depot and car depot. The system has other online functions such as transmitting reports, graphics management, statistics, searches, graphics wizard and web propaganda. It was applied in Pingdingshan Coal Co. Ltd.'s Railway Transport Department. 5 refs., 4 figs.

  6. 40 CFR 63.1363 - Standards for equipment leaks.

    Science.gov (United States)

    2010-07-01

    ... the replacement equipment and the actual date of delivery of the replacement equipment. (E) The date... heavy liquid service. Information, data, and analysis used to determine that a piece of equipment or... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Standards for equipment leaks. 63.1363...

  7. 41 CFR 109-50.4801 - Equipment Gift Agreement.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Equipment Gift Agreement... 50-SPECIAL DOE DISPOSAL AUTHORITIES 50.48-Exhibits § 109-50.4801 Equipment Gift Agreement. (a) The following Equipment Gift Agreement format will be used to provide gifts of excess and/or surplus equipment...

  8. 36 CFR 1207.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... 1207.32 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES... as follows: (1) Items of equipment with a current per-unit fair market value of less than $5,000 may...) Items of equipment with a current per unit fair market value in excess of $5,000 may be retained or sold...

  9. Management of radiological related equipments. Creating the equipment management database and analysis of the repair and maintenance records

    International Nuclear Information System (INIS)

    Eguchi, Megumu; Taguchi, Keiichi; Oota, Takashi; Kajiwara, Hiroki; Ono, Kiyotune; Hagio, Kiyofumi; Uesugi, Ekizo; Kajishima, Tetuo; Ueda, Kenji

    2002-01-01

    In 1997, we established the committee of equipments maintenance and management in our department. We designed the database in order to classify and register all the radiological related equipments using Microsoft Access. The management of conditions and cost of each equipment has become easier, by keeping and recording the database in the equipments management ledger and by filing the history of repairs or maintenances occurred to modalities. We then accounted numbers, cost of repairs and downtimes from the data of the repair and maintenance records for four years, and we reexamined the causal analysis of failures and the contents of the regular maintenance for CT and MRI equipments that had shown the higher numbers of repairs. Consequently, we have found the improvement of registration method of the data and the more economical way to use of the cost of repair. (author)

  10. 7 CFR 3015.168 - Disposal of equipment.

    Science.gov (United States)

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE UNIFORM FEDERAL ASSISTANCE REGULATIONS Property § 3015.168 Disposal of equipment. When original or replacement equipment is no longer to be used in projects or programs currently or... 7 Agriculture 15 2010-01-01 2010-01-01 false Disposal of equipment. 3015.168 Section 3015.168...

  11. 40 CFR 63.1434 - Equipment leak provisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Equipment leak provisions. 63.1434... Standards for Hazardous Air Pollutant Emissions for Polyether Polyols Production § 63.1434 Equipment leak provisions. (a) The owner or operator of each affected source shall comply with the HON equipment leak...

  12. Characterization equipment essential/support drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings and Support Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). Support Drawings: Are those drawings identified by facility staff that further describe the design details of structures, systems, or components shown on essential drawings. (HNF 1997a) The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered General drawings until the Characterization Equipment Drawing Evaluation Report (Wilson 1998) is updated during fiscal year 1999. Trucks 1 and 2 drawings are not included in this revision of the essential drawing list due to uncertainty about future use

  13. Radioactive decontamination of equipment

    International Nuclear Information System (INIS)

    1982-03-01

    After a recall of some definitions relating to decontamination techniques and of the regulation into effect, the principles to be respected to arrange rationally work zones are quoted while insisting more particularly on the types of coatings which facilitate maintenance operations and the dismantling of these installations. Then, the processes and equipments to use in decontamination units for routine or particular operations are described; the list of recommended chemical products to decontaminate the equipment is given. The influence of these treatments on the state and the duration of life of equipments is studied, and some perfectible methods are quoted. In the appendix, are given: the limits of surface contamination accepted in the centers; a standard project which defines the criteria of admissible residual contamination in wastes considered as cold wastes; some remarks on the interest that certain special ventilation and air curtain devices for the protection of operators working on apparatus generating contaminated dusts [fr

  14. 46 CFR 96.40-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pilot boarding equipment. 96.40-1 Section 96.40-1... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Pilot Boarding Equipment § 96.40-1 Pilot boarding... boat or other vessel. (b) Each vessel must have suitable pilot boarding equipment available for use on...

  15. 46 CFR 195.40-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Pilot boarding equipment. 195.40-1 Section 195.40-1... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Pilot Boarding Equipment § 195.40-1 Pilot boarding... boat or other vessel. (b) Each vessel must have suitable pilot boarding equipment available for use on...

  16. Three equipment concepts for the Fusion Engineering Device

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Masson, L.S.; Watts, K.D.; Grant, N.R.; Kuban, D.P.

    1982-01-01

    Maintenance equipment which is needed to remotely handle fusion device components is being conceptually developed for the Fusion Engineering Design Center. This will test the assumption that these equipment needs can be satisfied by present technology. In addition, the development of equipment conceptual designs will allow for cost estimates which have a much higher degree of certainty. Accurate equipment costs will be useful for assessments which trade off gains in availability as a function of increased investments in maintenance equipment

  17. 14 CFR 135.173 - Airborne thunderstorm detection equipment requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airborne thunderstorm detection equipment... Aircraft and Equipment § 135.173 Airborne thunderstorm detection equipment requirements. (a) No person may... the aircraft is equipped with either approved thunderstorm detection equipment or approved airborne...

  18. 14 CFR 25.1439 - Protective breathing equipment.

    Science.gov (United States)

    2010-01-01

    ... also enable the flightcrew to use radio equipment. (4) The part of the equipment protecting the eyes... Regulations: (1) The equipment must be designed to protect the appropriate crewmember from smoke, carbon... must include— (i) Masks covering the eyes, nose and mouth, or (ii) Masks covering the nose and mouth...

  19. 40 CFR 63.769 - Equipment leak standards.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Equipment leak standards. 63.769... § 63.769 Equipment leak standards. (a) This section applies to equipment subject to this subpart and... release to detect leaks, except under the following conditions. (i) The owner or operator has obtained...

  20. 40 CFR 63.424 - Standards: Equipment leaks.

    Science.gov (United States)

    2010-07-01

    ....424 Standards: Equipment leaks. (a) Each owner or operator of a bulk gasoline terminal or pipeline... location of all equipment in gasoline service at the facility. (c) Each detection of a liquid or vapor leak... replacement of leaking equipment shall be completed within 15 calendar days after detection of each leak...

  1. Cost analysis for heavy equipment in earthfill work - An optimization of heavy equipment fleet (Case study: Jabung ring dike project)

    Science.gov (United States)

    Arifin, Muhammad Faizal Ardhiansyah

    2017-03-01

    Earth fill work with large volumes of soil deposits will involve a lot of heavy equipment with a variety of functions and with different objectives. Where each machine will have different productivity anyway. So that in this paper discusses the calculation of the cost required to do the compacted earthfill work for embankment in accordance with the volume of work, the target date for implementation, and the number of heavy equipment needs. As the cost calculations used heavy equipment rental price per hour. In the cost analysis calculations use heavy equipment here there are several factors that we included in the calculation, are: 1.)Hauling distance; 2.)Effective hour a day; 3.)Change factor of Soil Volume; 4.)Effective Speed; 5.)Equipment efficiency factor; 6.)Equipment coefficient; 7.)Cycle Time.

  2. 46 CFR 32.90-1 - Pilot boarding equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Pilot boarding equipment. 32.90-1 Section 32.90-1... REQUIREMENTS Pilot Boarding Equipment § 32.90-1 Pilot boarding equipment. (a) This section applies to each... must have suitable pilot boarding equipment available for use on each side of the vessel. If a vessel...

  3. Nuclear power equipment procurement management under EPC mode

    International Nuclear Information System (INIS)

    Shuai Yuezhi

    2014-01-01

    Nuclear power equipment procurement is one of the major constraints and management difficulties in the process of domestic nuclear power project construction for a long time. The construction of Hainan Changjiang Project can not meet the milestones due to the major equipment supply delay. Through the introduction to the organization and features of Changjiang project equipment procurement under EPC mode, and the main problems in the procurement process and its reason analysis, the purpose of this paper is to put forward ideas and suggestions of these items, i.e. selection of equipment suppliers, equipment localization, mass material design and procurement, complete system equipment supply, spare parts delivery and storage, owner process management, providing reference for follow-up projects. (author)

  4. Drawing Evaluation Report for Sampling Equipment Drawings

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    This document presents the results of a task to update the evaluation of River Protection Project (WP) sampling equipment drawings and updates the assigned drawings category as either essential, support, or general drawings. This report updates the drawing evaluation that was originally done per Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation. The scope of this report is limited to updating the evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the RPP Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, all core sampling equipment, and Light Duty Utility Arm (LDUA) (see LMHC contract No. 519, release 10). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The Cone Penetrometer system, which is depicted on vendor drawings, (not H- series), is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and was not included in the original scope for this update and will be addressed in the evaluation update scheduled for later in fiscal year 1999, when equipment ownership is determined

  5. Drawing evaluation report for sampling equipment drawings

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    This document presents the results of a task to evaluate Tank Waste Remediation System (TWRS) sampling equipment drawings and identifies drawings category as either essential, support, or general drawings. This report completes the drawing evaluation task as outlined in Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation (Wilson, 1997). The scope of this report is limited to an evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the TRWS Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, and all core sampling equipment (see LMHC Task Order 304). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Light Duty Utility Arm (LDUA), Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The LDUA drawings are addressed in the Characterization Equipment Essential Drawings (HNF 1998). The Cone Penetrometer system drawings which are vendor drawings (not H- series) is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and were not included in the original scope for this evaluation and will be addressed in the evaluation update scheduled for fiscal year 1999

  6. AX Tank Farm ancillary equipment study

    International Nuclear Information System (INIS)

    SKELLY, W.A.

    1999-01-01

    This report examines the feasibility of remediating ancillary equipment associated with the 241-AX Tank Farm at the Hanford Site. Ancillary equipment includes surface structures and equipment, process waste piping, ventilation components, wells, and pits, boxes, sumps, and tanks used to make waste transfers to/from the AX tanks and adjoining tank farms. Two remedial alternatives are considered: (1) excavation and removal of all ancillary equipment items, and (2) in-situ stabilization by grout filling, the 241-AX Tank Farm is being employed as a strawman in engineering studies evaluating clean and landfill closure options for Hanford single-shell tanks. This is one of several reports being prepared for use by the Hanford Tanks Initiative Project to explore potential closure options and to develop retrieval performance evaluation criteria for tank farms

  7. 29 CFR 1926.603 - Pile driving equipment.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Pile driving equipment. 1926.603 Section 1926.603 Labor... Operations § 1926.603 Pile driving equipment. (a) General requirements. (1) Boilers and piping systems which are a part of, or used with, pile driving equipment shall meet the applicable requirements of the...

  8. 46 CFR 71.25-25 - Hull equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Hull equipment. 71.25-25 Section 71.25-25 Shipping COAST... Inspection § 71.25-25 Hull equipment. (a) At each annual inspection, the inspector shall conduct the following tests and inspections of hull equipment: (1) All subdivision bulkheads shall be examined to...

  9. Diagnostic x-ray equipment compliance and facility survey. Recommended procedures for equipment and facility testing

    International Nuclear Information System (INIS)

    1994-01-01

    The Radiation Protection Bureau has set out guidelines for the testing of diagnostic x-ray equipment and facilities. This guide provides information for the x-ray inspector, test engineer, technologist, medical physicist and any other person responsible for verifying the regulatory compliance or safety of diagnostic x-ray equipment and facilities. Diagnostic x-radiation is an essential part of present day medical practice. The largest contributor of irradiation to the general population comes from diagnostic x-radiation. Although individual irradiations are usually small, there is a concern of possible excess cancer risk when large populations are irradiated. Unnecessary irradiations to patients from radiological procedures can be significantly reduced with little or no decrease in the value of medical diagnostic information. This can be achieved by using well designed x-ray equipment which is installed, used and maintained by trained personnel, and by the adoption of standardized procedures. In general, when patient surface dose is reduced, there is a corresponding decrease in dose to x-ray equipment operators and other health care personnel. 2 tabs., 4 figs

  10. Diagnostic x-ray equipment compliance and facility survey. Recommended procedures for equipment and facility testing

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The Radiation Protection Bureau has set out guidelines for the testing of diagnostic x-ray equipment and facilities. This guide provides information for the x-ray inspector, test engineer, technologist, medical physicist and any other person responsible for verifying the regulatory compliance or safety of diagnostic x-ray equipment and facilities. Diagnostic x-radiation is an essential part of present day medical practice. The largest contributor of irradiation to the general population comes from diagnostic x-radiation. Although individual irradiations are usually small, there is a concern of possible excess cancer risk when large populations are irradiated. Unnecessary irradiations to patients from radiological procedures can be significantly reduced with little or no decrease in the value of medical diagnostic information. This can be achieved by using well designed x-ray equipment which is installed, used and maintained by trained personnel, and by the adoption of standardized procedures. In general, when patient surface dose is reduced, there is a corresponding decrease in dose to x-ray equipment operators and other health care personnel. 2 tabs., 4 figs.

  11. 32 CFR 34.21 - Real property and equipment.

    Science.gov (United States)

    2010-07-01

    ... original equipment as trade-in or sell it and use the proceeds to offset the costs of the replacement... request approval to use equipment as trade-in or offset for replacement equipment (see paragraph (e)(1)(i... 32 National Defense 1 2010-07-01 2010-07-01 false Real property and equipment. 34.21 Section 34.21...

  12. 33 CFR 142.24 - Use of equipment.

    Science.gov (United States)

    2010-07-01

    ... CONTINENTAL SHELF ACTIVITIES WORKPLACE SAFETY AND HEALTH Personal Protective Equipment § 142.24 Use of equipment. (a) Each holder of a lease or permit issued under the Act shall ensure that all personnel who are required by this subpart to use or wear personal protective equipment do so when within the lease area or...

  13. Developing equipment for AGR remote visual inspection

    International Nuclear Information System (INIS)

    James, P.W.; Walton, P.J.

    1985-01-01

    The Remote Inspection Group is part of the CEGB's Generation Development and Construction Division, and has responsibility for the design, development, procurement, testing and setting to work of the equipment provided to carry out routine remote visual inspections of its AGRs. This equipment includes both the viewing devices and the necessary placement equipment. (author)

  14. 27 CFR 6.43 - Sale of equipment.

    Science.gov (United States)

    2010-04-01

    ... OF THE TREASURY LIQUORS âTIED-HOUSEâ Unlawful Inducements Furnishing Things of Value § 6.43 Sale of equipment. A transaction in which equipment is sold to a retailer by an industry member, except as provided.... Further, the negotiation by an industry member of a special price to a retailer for equipment from an...

  15. 46 CFR 28.130 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Survival craft equipment. 28.130 Section 28.130 Shipping... INDUSTRY VESSELS Requirements for All Vessels § 28.130 Survival craft equipment. (a) General. Each item of survival craft equipment must be of good quality, effective for the purpose it is intended to serve, and...

  16. The UK market for gaseous emissions control equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    The report analyses the changes in demand for gaseous emissions control equipment in the United Kingdom over the next 5 years. It discusses the factors affecting demand such as legislation reporting of environmental performance, and economic factors. It looks at environmental expenditure by UK industry. Markets are examined, for VOC abatement systems; thermal incinerators; adsorption equipment; catalytic oxidisers; absorption equipment; biological treatments; cryogenic equipment; SO{sub x} abatement equipment; wet FGD; wet dry FGD, dry scrubbers; NOx abatement systems; selective catalytic reduction; and selective non-catalytic reduction. Profiles are given of 16 leading suppliers.

  17. An Evaluation Method of Equipment Reliability Configuration Management

    Science.gov (United States)

    Wang, Wei; Feng, Weijia; Zhang, Wei; Li, Yuan

    2018-01-01

    At present, many equipment development companies have been aware of the great significance of reliability of the equipment development. But, due to the lack of effective management evaluation method, it is very difficult for the equipment development company to manage its own reliability work. Evaluation method of equipment reliability configuration management is to determine the reliability management capabilities of equipment development company. Reliability is not only designed, but also managed to achieve. This paper evaluates the reliability management capabilities by reliability configuration capability maturity model(RCM-CMM) evaluation method.

  18. Lessons learned in testing of Safeguards equipment

    International Nuclear Information System (INIS)

    Pepper, Susan; Farnitano, Michael; Carelli, Joseph

    2001-01-01

    Full text: During the 1990s, the IAEA Department of Safeguards began a transition from analog to digital equipment. This included surveillance equipment, seals, NDA measurement systems, and other instruments. The transition to digital equipment was intended to facilitate compatibility between and integration of instruments, remote communication of data, improved data storage, and modernization. Many of the instruments are designed to operate on battery power during loss of facility power, and therefore, are designed to consume minimal power. In 2000, the IAEA experienced a number of failures in digital image surveillance (DIS) equipment. A study of the performance data revealed that the failures occurred in 'high risk' environments where the systems were exposed to neutrons. As a supporter of IAEA equipment development and implementation, the U.S. Support Program worked with the IAEA, the equipment designer, and the equipment manufacturer in special meetings on DIS to determine the cause of the failures. It was as a result of these meetings that single event upset (SEU) was determined to be the root cause of the failures. The meeting participants also identified a list of actions to improve the reliability of DIS systems. As a result of the DIS meetings and the identified actions, the U.S. Support Program approved a request from the IAEA and established Task E.125, 'Remote Monitoring and Unattended Digital Surveillance Systems.' This task is an umbrella task intended to provide a mechanism for response to IAEA needs related to improving the reliability of unattended, remote monitoring and DIS equipment. Subtasks approved under this task include: E.125.1, 'SDIS Software Consolidation and DCM-14 Audit' - This subtask involves the consolidation of a number of individual upgrades to the SDIS and review of the DCM-14 software. As the sponsor of the design of the DCM-14 by Dr. Neumann, the German Support Program is also a participant in this subtask; E.125.2, 'DIS

  19. Another donation of computer equipment

    CERN Multimedia

    Anaïs Schaeffer

    2014-01-01

    On Thursday 27 February, CERN was pleased to donate computer equipment to a physics institute in the Philippines.   H.E. Leslie J. Baja and Rolf Heuer. Following donations of computer equipment to institutes in Morocco, Ghana, Bulgaria, Serbia and Egypt, CERN is to send 50 servers and 4 network switches to the National Institute of Physics at the University of the Philippines Diliman. CERN’s Director-General Rolf Heuer and the Ambassador of the Philippines to Switzerland and Lichtenstein, H.E. Leslie J. Baja, spoke of their enthusiasm for the project during an official ceremony. The equipment will be used for various high energy physics research programmes in the Philippines and for the University’s development of digital resources for science.

  20. 18 CFR 367.3980 - Account 398, Miscellaneous equipment.

    Science.gov (United States)

    2010-04-01

    ... service company's operations that are not included in any other account of this system of accounts. (b... equipment. (3) Employees' recreation equipment. (4) Radios. (5) Restaurant equipment. (6) Soda fountains. (7...

  1. Strategy for conformity of non-standard cryogenic equipment

    CERN Multimedia

    CERN. Geneva

    2016-01-01

    CERN as an intergovernmental organization establishes its own Safety Rules as necessary for its proper functioning. In particular, the CERN General Safety Instruction for cryogenic equipment requires that cryogenic pressure equipment at CERN shall comply with the European Pressure Equipment Directive (PED). However, due to the particular features of some of the cryogenic equipment required for the accelerators, as well as the existence of international collaborations with in-kind contributions from non-EU countries, full compliance with the PED may not always be achieved. This situation is foreseen in the Safety Rules, where CERN HSE will define the Safety requirements applicable to such equipment as well as any eventual additional compensatory measure as to ensure a commensurate level of Safety for our pressure equipment. Where compliance with PED may not be achieved, CERN HSE will become the de facto Notified Body and therefore be in charge of the assessment of the conformity of the equipment to the applica...

  2. Methodology for assessing laser-based equipment

    Science.gov (United States)

    Pelegrina-Bonilla, Gabriel; Hermsdorf, Jörg; Thombansen, Ulrich; Abels, Peter; Kaierle, Stefan; Neumann, Jörg

    2017-10-01

    Methodologies for the assessment of technology's maturity are widely used in industry and research. Probably the best known are technology readiness levels (TRLs), initially pioneered by the National Aeronautics and Space Administration (NASA). At the beginning, only descriptively defined TRLs existed, but over time, automated assessment techniques in the form of questionnaires emerged in order to determine TRLs. Originally TRLs targeted equipment for space applications, but the demands on industrial relevant equipment are partly different in terms of, for example, overall costs, product quantities, or the presence of competitors. Therefore, we present a commonly valid assessment methodology with the aim of assessing laser-based equipment for industrial use, in general. The assessment is carried out with the help of a questionnaire, which allows for a user-friendly and easy accessible way to monitor the progress from the lab-proven state to the application-ready product throughout the complete development period. The assessment result is presented in a multidimensional metric in order to reveal the current specific strengths and weaknesses of the equipment development process, which can be used to direct the remaining development process of the equipment in the right direction.

  3. Detection of Equipment Faults Before Beam Loss

    CERN Document Server

    Galambos, J.

    2016-01-01

    High-power hadron accelerators have strict limits on fractional beam loss. In principle, once a high-quality beam is set up in an acceptable state, beam loss should remain steady. However, in practice, there are many trips in operational machines, owing to excessive beam loss. This paper deals with monitoring equipment health to identify precursor signals that indicate an issue with equipment that will lead to unacceptable beam loss. To this end, a variety of equipment and beam signal measurements are described. In particular, several operational examples from the Spallation Neutron Source (SNS) of deteriorating equipment functionality leading to beam loss are reported.

  4. Utility equipment systems: promising more for less

    Energy Technology Data Exchange (ETDEWEB)

    1987-10-01

    This paper discusses current developments in utility equipment systems, a term applied to carrier vehicles, mostly evolved from well-known forms of construction or mining equipment modified to work with a variety of different front or back end attachments. One of the equipment ranges discussed is the Normet cassette system produced by the Orion corporation of Finland, which allows a basic chassis to be converted from a personnel carrier to an ANFO carrier within minutes. LHD vehicles which are being adapted to fulfil multipurpose roles, such as carrying roof supports, chocks and other heavy mining equipment underground are also discussed. 5 figs.

  5. Experience with rotating equipment in FBTR

    International Nuclear Information System (INIS)

    Babu, A.; Subramanian, K.G.; Selvam, B.

    2006-01-01

    Fast breeder test reactor (FBTR) is a 40MWth sodium cooled PuC-UC fuelled fast breeder reactor located at Kalpakkam, Tamilnadu. FBTR has a variety of mechanical and electrical equipment comprising of single stage and multi stage water pumps, sodium pumps, compressors, Chiller units, Diesel Generator sets, vacuum pumps, ventilation fans, Turbo generator etc. The degree and extent of maintenance on these equipment are decided based on nuclear safety, station technical specification requirements, design criteria and operating philosophy. The variety and complexity of the equipment in FBTR demands various maintenance strategies (preventive, predictive, proactive etc.) for their upkeep. This paper discusses the performance of all mechanical and electrical equipment in FBTR, measures taken for their upkeep, major modifications done to prevent recurring failures, condition monitoring programme implemented, Maintenance Management and Information System developed for data acquisition and dissemination, etc. (author)

  6. Radiation therapy sources, equipment and installations

    International Nuclear Information System (INIS)

    2011-03-01

    The safety code for Telegamma Therapy Equipment and Installations, (AERB/SC/MED-1) and safety code for Brachytherapy Sources, Equipment and Installations, (AERB/SC/MED-3) were issued by AERB in 1986 and 1988 respectively. These codes specified mandatory requirements for radiation therapy facilities, covering the entire spectrum of operations ranging from the setting up of a facility to its ultimate decommissioning, including procedures to be followed during emergency situations. The codes also stipulated requirements of personnel and their responsibilities. With the advent of new techniques and equipment such as 3D-conformal radiation therapy, intensity modulated radiation therapy, image guided radiation therapy, treatment planning system, stereotactic radiosurgery, stereotactic radiotherapy, portal imaging, integrated brachytherapy and endovascular brachytherapy during the last two decades, AERB desires that these codes be revised and merged into a single code titled Radiation Therapy Sources, Equipment, and Installations

  7. Contact Dermatitis to Personal Sporting Equipment in Youth.

    Science.gov (United States)

    Marzario, Barbara; Burrows, Dianne; Skotnicki, Sandy

    2016-07-01

    Contact dermatitis to personal sporting equipment in youth is poorly studied. To review the results of patch testing 6 youth to their sporting equipment in a dermatology general private practice from 2006 to 2011. A retrospective analysis of 6 youth aged 11 to 14 who were evaluated for chronic and persistent dermatitis occurring in relation to sports equipment was conducted. All patients were subjected to epicutaneous (patch) testing, which included some or all of the following: North American Contact Dermatitis Group (NACGD) series, textile series, rubber series, corticosteroid series, and raw material from the patients' own personal equipment. All cases had 1 or more positive patch test reactions to an allergen within the aforementioned series, and 3 subjects tested positive to their personal equipment in raw form. Allergic contact dermatitis, not irritant, was deemed the relevant cause of chronic dermatitis in 4 of the 6 patients due to positive reactions to epicutaneous tests and/or personal equipment. The utility of testing to patients' own sporting equipment was shown to be of additional value and should be considered when patch testing for contact allergy to sporting equipment. © The Author(s) 2015.

  8. Oil and gas products and energy equipment

    International Nuclear Information System (INIS)

    1996-01-01

    The planned activities of the Canadian oil and gas products and energy equipment industry for 1996-1997, were presented. The sector is made up of approximately 1500 small and medium sized enterprises. The Canadian oil field manufacturing and servicing industry holds only a small 2.5% share of the world export market, but it is recognized internationally as one of the leading suppliers of advanced petroleum equipment. Their exports include specialized equipment for extracting oil sands, gathering and treatment facilities for sour gas, underbalanced drilling technologies, equipment for wells experiencing declining production rates, top motor drives, winter drilling rigs, and horizontal drilling technologies. They also offer petroleum industry software products. Most exploration and production equipment sold abroad by Canadian firms is manufactured in Canada, but there is an increasing trend toward manufacturing in the country of operation. 2 tabs

  9. Medical equipment in government health facilities: missed opportunities.

    Science.gov (United States)

    Pardeshi, Geeta S

    2005-01-01

    The availability and optimal utilization of medical equipment is important for improving the quality of health services. Significant investments are made for the purchase, maintenance and repair of medical equipment. Inadequate management of these equipment will result in financial losses and deprive the public of the intended benefits. This analysis is based on the conceptual framework drawn from the WHO recommended- lifecycle of medical equipment. (1) To identify the problems in different stages of the life cycle. (2) To assess its financial implications and effect on service delivery. Analysis of secondary data from the latest Comptroller and Auditor General (CAG) Reports for the states in India. The study variables were category of equipment, financial implications and problems in the stages of life cycle. Calculation of proportions. A total of forty instances mentioning problems in the first phase of the life cycle of medical equipment were noted in 12 state reports. The equipment from the radiology department (15), equipment in the wards (5), laboratory (3) and operation theatres (4) were the ones most frequently implicated. In a majority of cases the financial implications amounted to twenty-five lakhs. The financial implications were in the form of extra expenditure, unfruitful expenditure or locking of funds. In 25 cases the equipment could not be put to use because of non-availability of trained staff and inadequate infrastructural support. Careful procurement, incoming inspection, successful installation and synchronization of qualified trained staff and infrastructural support will ensure timely onset of use of the equipment.

  10. Personal Protective Equipment

    National Research Council Canada - National Science Library

    1998-01-01

    ... of personal protective equipment A safety program for new employees is a necessary part of any orientation program An on-going safety program should be used to motivate employees to continue to use...

  11. Methodology development for availability improvement of standby equipment

    International Nuclear Information System (INIS)

    Shin, Sung Min; Jeon, In Seop; Kang, Hyun Gook

    2014-01-01

    The core damage frequency (CDF) of operating and constructing pressurized nuclear plants are ranging on the order of 10 -5 and 10 -6 per year. The target CDF of new NPP design has been set at 10 -7 . In this context, although various systems are currently studied, availability improvement of standby equipment will be more efficient than the additional application of safety systems. It is obvious in every aspect, such as management and cost efficiency. Here, soundness can affect equipment unavailability, and the soundness degrades because of aging. However, some studies did not consider aging when calculating the unavailability. Standby equipment can age because of two important factors: standby stress which accumulates over time, and test stress which accumulates with the number of tests (or operations). Both factors should be considered together when aging is considered. However, some studies only considered standby stress or test stress. There are some previous studies which considered both factors. Besides equipment soundness related to aging effect, some process like bypass during test also can affect equipment unavailability because the original function of equipment cannot be performed immediately during this process. However, there are seldom studies dealing with above factors as a whole problem. This study investigated a general approach to calculate the unavailability of standby equipment which considers aging caused by standby and test stresses and bypass process. Based on this general approach, we propose two maintenance strategies which aim to reduce standby equipment unavailability. In section 2, the general approach is presented. As one of the strategies, the changing test interval method (CIM) is introduced in section 3, and its effectiveness is also analyzed. The online monitoring method (OMM) is investigated in section 4 as another method to reduce equipment unavailability. In section 5, a combination of these two methods is analyzed. A general

  12. Fire prevention and protection for trackless equipment

    Energy Technology Data Exchange (ETDEWEB)

    Burger, A.J.

    1988-10-01

    With the increased use of trackless diesel and electrical equipment underground, the fire danger associated with this equipment has increased. The need for adequate fire prevention and protection on all aspects of trackless mechanised mining must be taken into consideration. This paper describes briefly the causes of fires on trackless equipment and the precautions taken to reduce the risk of ignition. 1 tab.

  13. Load Bearing Equipment for Bone and Muscle

    Science.gov (United States)

    Shackelford, Linda; Griffith, Bryan

    2015-01-01

    Resistance exercise on ISS has proven effective in maintaining bone mineral density and muscle mass. Exploration missions require exercise with similar high loads using equipment with less mass and volume and greater safety and reliability than resistance exercise equipment used on ISS (iRED, ARED, FWED). Load Bearing Equipment (LBE) uses each exercising person to create and control the load to the partner.

  14. Equipment improvements for performance enhancement

    International Nuclear Information System (INIS)

    Gaestel, P.; Guesnon, H.; Sauze, G.

    1994-01-01

    In order to enhance the reactor availability, several improvements on reactor equipment have been developed: design optimization for stator maintenance replacement in the main alternator; adjustment modification of stator coils in the main alternator for an easier maintenance; improvement of the fuel handling line (pole crane, transfer equipment, loading machine); development of a loose part trapping system in the steam generator secondary circuit. 1 tab

  15. Low level photoneutron detection equipment

    International Nuclear Information System (INIS)

    Ji Changsong; Zhang Yuqin; Li Yuansui

    1991-01-01

    A low level photoneutron detection equipment has been developed. The photoneutrons produced by interaction of 226 Ra gamma quanta and deutron (D) target are detected with n-n discrimination detector made up of 3 He proportional counter array. The D-content information in the target can be obtained from the measured photoneutron counts. The equipment developed is mainly used for nondestructive D-content measurement of D-devices

  16. Equipment Obsolescence Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Redmond, J.

    2014-07-01

    Nuclear Power Plant (NPP) Operators are challenged with securing reliable supply channels for safety related equipment due to equipment obsolescence. Many Original Equipment Manufacturers (OEMs) have terminated production of spare parts and product life-cycle support. The average component life cycles are much shorter than the NPP design life, which means that replacement components and parts for the original NPP systems are not available for the complete design life of the NPPs. The lack or scarcity of replacement parts adversely affects plant reliability and ultimately the profitability of the affected NPPs. This problem is further compounded when NPPs pursue license renewal and approval for plant-life extension. A reliable and predictable supply of replacement co components is necessary for NPPs to remain economically competitive and meet regulatory requirements and guidelines. Electrical and I and C components, in particular, have short product life cycles and obsolescence issues must be managed pro actively and not reactively in order to mitigate the risk to the NPP to ensure reliable and economic NPP operation. (Author)

  17. Earthquake protection of essential civil and industrial equipments

    International Nuclear Information System (INIS)

    Bourrier, P.; Le Breton, F.; Thevenot, A.

    1986-01-01

    This document presents the principal reflexions concerning seismic engineering applications for equipment and the difference of the non-employment towards these structures. The notion of essential equipment is then pointed out as well as the main particularities of equipment considered as structures. Finally, this document illustrates a few pathological examples encountered after an earthquake, and presents some equipments of a nuclear power plant which to resist an increased safety seism [fr

  18. Plutonium Immobilization Can Loading Equipment Review

    International Nuclear Information System (INIS)

    Kriikku, E.; Ward, C.; Stokes, M.; Randall, B.; Steed, J.; Jones, R.; Hamilton, L.

    1998-05-01

    This report lists the operations required to complete the Can Loading steps on the Pu Immobilization Plant Flow Sheets and evaluates the equipment options to complete each operation. This report recommends the most appropriate equipment to support Plutonium Immobilization Can Loading operations

  19. Equipment system for advanced nuclear fuel development

    International Nuclear Information System (INIS)

    Kwon, Hyuk Il; Ji, C. G.; Bae, S. O.

    2002-11-01

    The purpose of the settlement of equipment system for nuclear Fuel Technology Development Facility(FTDF) is to build a seismic designed facility that can accommodate handling of nuclear materials including <20% enriched Uranium and produce HANARO fuel commercially, and also to establish the advanced common research equipment essential for the research on advanced fuel development. For this purpose, this research works were performed for the settlement of radiation protection system and facility special equipment for the FTDF, and the advanced common research equipment for the fuel fabrication and research. As a result, 11 kinds of radiation protection systems such as criticality detection and alarm system, 5 kinds of facility special equipment such as environmental pollution protection system and 5 kinds of common research equipment such as electron-beam welding machine were established. By the settlement of exclusive domestic facility for the research of advanced fuel, the fabrication and supply of HANARO fuel is possible and also can export KAERI-invented centrifugal dispersion fuel materials and its technology to the nations having research reactors in operation. For the future, the utilization of the facility will be expanded to universities, industries and other research institutes

  20. Development of remote handling tools and equipment

    International Nuclear Information System (INIS)

    Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou; Ito, Akira; Fukatsu, Seiichi; Oda, Yasushi; Kajiura, Soji; Yamazaki, Seiichiro; Aoyama, Kazuo.

    1997-01-01

    The remote handling (RH) tools and equipment development in ITER focuses mainly on the welding and cutting technique, weld inspection and double-seal door which are essential factors in the replacement of in-vessel components such as divertor and blanket. The conceptual design of these RH tools and equipment has been defined through ITER engineering design activity (EDA). Similarly, elementary R and D of the RH tools and equipment have been extensively performed to accumulate a technological data base for process and performance qualification. Based on this data, fabrications of full-scale RH tools and equipment are under progress. A prototypical bore tool for pipe welding and cutting has already been fabricated and is currently undergoing integrated performance tests. This paper describes the design outline of the RH tools and equipment related to in-vessel components maintenance, and highlights the current status of RH tools and equipment development by the Japan Home Team as an ITER R and D program. This paper also includes an outline of insulation joint and quick-pipe connector development, which has also been conducted through the ITER R and D program in order to standardize RH operations and components. (author)

  1. Remote maintenance ''lessons learned'' on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    Hardware representative of essentially every major equipment item necessary for reprocessing breeder reactor nuclear fuel has been installed and tested for remote maintainability. This testing took place in a cold mock-up of a remotely maintained hot cell operated by the Consolidated Fuel Reprocessing Program (CFRP) within the Fuel Recycle Division at Oak Ridge National Laboratory (ORNL). The reprocessing equipment tested included a Disassembly System, a Shear System, a Dissolver System, an Automated Sampler System, removable Equipment Racks on which various chemical process equipment items were mounted, and an advanced servomanipulator (ASM). These equipment items were disassembled and reassembled remotely by using the remote handling systems that are available within the cold mock-up area. This paper summarizes the ''lessons learned'' as a result of the numerous maintenance activities associated with each of these equipment items. 4 refs., 3 figs., 1 tab

  2. FUSRAP equipment concept development study

    International Nuclear Information System (INIS)

    Hinerman, K.B.; Smith, R.E.

    1981-01-01

    Under DOE contract, Dalton-Dalton-Newport, Inc. is performing an engineering evaluation of three selected FUSRAP sites in an effort to generate equipment concepts to perform remedial action for retrieval, packaging, storing, and transporting contaminated soil and other debris. Along with this engineering evaluation, an analysis of state and Federal regulations was made which had significant impact on the selected equipment and costs for each remedial action concept

  3. Medical equipment in government health facilities: Missed opportunities

    OpenAIRE

    Pardeshi Geeta

    2005-01-01

    BACKGROUND: The availability and optimal utilization of medical equipment is important for improving the quality of health services. Significant investments are made for the purchase, maintenance and repair of medical equipment. Inadequate management of these equipment will result in financial losses and deprive the public of the intended benefits. This analysis is based on the conceptual framework drawn from the WHO recommended- lifecycle of medical equipment. AIMS: (1) To identify the probl...

  4. Long Length Contaminated Equipment Maintenance Plan

    International Nuclear Information System (INIS)

    ESVELT, C.A.

    2000-01-01

    The purpose of this document is to provide the maintenance requirements of the Long Length Contaminated Equipment (LLCE) trailers and provide a basis for the maintenance frequencies selected. This document is applicable to the LLCE Receiver trailer and Transport trailer assembled by Mobilized Systems Inc. (MSI). Equipment used in conjunction with, or in support of, these trailers is not included. This document does not provide the maintenance requirements for checkout and startup of the equipment following the extended lay-up status which began in the mid 1990s. These requirements will be specified in other documentation

  5. CV equipment responsibilities

    CERN Document Server

    Pirollet, B

    2008-01-01

    This document describes the limits of the responsibilities of the TS/CV for fire fighting equipment at the LHC. The various interfaces, providers and users of the water supply systems and clean water raising systems are described.

  6. Equipment for the handling of thorium materials

    International Nuclear Information System (INIS)

    Heisler, S.W. Jr.; Mihalovich, G.S.

    1988-01-01

    The Feed Materials Production Center (FMPC) is the United States Department of Energy's storage facility for thorium. FMPC thorium handling and overpacking projects ensure the continued safe handling and storage of the thorium inventory until final disposition of the materials is determined and implemented. The handling and overpacking of the thorium materials requires the design of a system that utilizes remote handling and overpacking equipment not currently utilized at the FMPC in the handling of uranium materials. The use of remote equipment significantly reduces radiation exposure to personnel during the handling and overpacking efforts. The design system combines existing technologies from the nuclear industry, the materials processing and handling industry and the mining industry. The designed system consists of a modified fork lift truck for the transport of thorium containers, automated equipment for material identification and inventory control, and remote handling and overpacking equipment for material identification and inventory control, and remote handling and overpacking equipment for repackaging of the thorium materials

  7. Radio monitoring problems, methods, and equipment

    CERN Document Server

    Rembovsky, Anatoly; Kozmin, Vladimir; Smolskiy, Sergey

    2009-01-01

    Offers a unified approach to fundamental aspects of Automated Radio Monitoring (ARM). This book discusses the development, modeling, design, and manufacture of ARM systems. It provides classification and descriptions of modern high-efficient hardware-software ARM equipment, including the equipment for detection and radio direction-finding.

  8. [Application of information management system about medical equipment].

    Science.gov (United States)

    Hang, Jianjin; Zhang, Chaoqun; Wu, Xiang-Yang

    2011-05-01

    Based on the practice of workflow, information management system about medical equipment was developed and its functions such as gathering, browsing, inquiring and counting were introduced. With dynamic and complete case management of medical equipment, the system improved the management of medical equipment.

  9. Days individual equipment of protection and professional risks

    International Nuclear Information System (INIS)

    2007-01-01

    The personal protection equipment is studied in the legal way (legal liabilities, certification, European texts), technical way (ergonomics, painfulness of ventilated equipment wearing, reliability of a respirable air line, protection gloves against the chemical risk, exposure to nano particulates, working in hot area), human factors (hostile area and emotion management), studies on personal equipment such evaluation, efficiency, conception of new equipment, physiological tolerance, limit of use, and some general safety studies on the working places. (N.C.)

  10. 24 CFR 965.306 - Energy conservation equipment and practices.

    Science.gov (United States)

    2010-04-01

    ... Measures § 965.306 Energy conservation equipment and practices. In purchasing original or, when needed, replacement equipment, PHAs shall acquire only equipment that meets or exceeds the minimum efficiency... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Energy conservation equipment and...

  11. 30 CFR 77.410 - Mobile equipment; automatic warning devices.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Mobile equipment; automatic warning devices. 77... UNDERGROUND COAL MINES Safeguards for Mechanical Equipment § 77.410 Mobile equipment; automatic warning devices. (a) Mobile equipment such as front-end loaders, forklifts, tractors, graders, and trucks, except...

  12. 33 CFR 105.250 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... systems and equipment maintenance. (a) Security systems and equipment must be in good working order and... include procedures for identifying and responding to security system and equipment failures or...

  13. 33 CFR 104.260 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... systems and equipment maintenance. (a) Security systems and equipment must be in good working order and... procedures for identifying and responding to security system and equipment failures or malfunctions. ...

  14. Underground coal mining - methods, equipment developments and trends

    Energy Technology Data Exchange (ETDEWEB)

    Singhal, R

    1988-12-01

    Underground mines are truly beginning to accept the so-called 'high tech' technology evident in other industries. Automation, remote control and robotics have taken an added significance. Wireless communication, mine-wide equipment health and performance monitoring, and transmission of data from deeper levels to surface is moving towards becoming the norm. There is emphasis on developing and applying continuous mining systems, as well as on modifying cyclical discontinuous methods to continuous systems. Multi-purpose equipment is also being developed. Technology transfer is playing its role - equipment and systems from surface coal mining are being applied to underground mining and vice-versa. At the American Mining Congress Exhibition held in Chicago in April 1988, a variety of equipment for underground mining was displayed including coal face equipment such as shearer loaders, conveyors and powered supports, and equipment for room-and-pillar coal mining. The trend continues to be towards high power machines equipped with a variety of electronics and sensors, safety devices, and alarm systems. Ancillary equipment on display covered a variety of cutting drums, cutting tools, conveying equipment and so on. In room-and-pillar mining, the overall emphasis was on moving away from the cyclical nature of the work. Transportation by shuttle cars must be replaced by continuous transport systems such as conveyors. Experience from Australia has shown that the application of continuous haulage and breaker line supports has permitted a doubling of production from room-and-pillar systems. Production levels of 3,000tpd have already been achieved, and 4,000tpd is considered achievable.

  15. Seismic verification of nuclear plant equipment anchorage

    International Nuclear Information System (INIS)

    Lepiece, M.; Van Vyve, J.

    1991-01-01

    More than 60% of the electrical power of Belgium is generated by seven PWR nuclear power plants. For three of them, the electro-mechanical equipment had to be reassessed after ten years of operation, because the seismic requirements were upgraded from 0.1 g to 0.17 g free field ground acceleration. The seismic requalification of the active equipment was a critical problem as the classical methods were too conservative. The approach based on the use of the past experience on the seismic behavior of nonnuclear equipment, chosen and developed by the SQUG, had to be transposed to the Belgian N.P.P. The decision of the accept-ability of equipment relies heavily on the aseismatic capacity of anchorage. The Electrical Power Research Institute (EPRI) developed the procedure and guideline for the demonstration of the aseismatic adequacy of equipment anchorage in a cost-effective and consistent manner, to support the decision by Seismic Review Team. The field inspection procedure to identify the type of fasteners and detect their possible defects and the verification procedure developed to calculate the aseismatic capacity of equipment anchorage on the strength of fasteners, the aseismatic capacity of anchorage and the comparison of the capacity with the demand are reported. (K.I.)

  16. 75 FR 71123 - Agency Information Collection Activities; Proposed Collection; Comment Request; Safer Detergent...

    Science.gov (United States)

    2010-11-22

    ..., cleaners, airplane deicers, and fire-fighting foams. Safer surfactants are those that break down quickly to... protected through regulations.gov or e- mail. The regulations.gov Web site is an ``anonymous access'' system... technology and systems for the purposes of collecting, validating, and verifying information, processing and...

  17. Electronic quality control on dental x-rays equipment

    International Nuclear Information System (INIS)

    Pomares C, Martin

    1996-09-01

    A brief description of dental x-ray equipment is done. The non-invasive quality control is treated as than the responsibilities from the dentists to the patient and the equipment. A propose for quality control for dental x-ray equipment, film and developer is include

  18. 14 CFR 121.303 - Airplane instruments and equipment.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airplane instruments and equipment. 121.303... Airplane instruments and equipment. (a) Unless otherwise specified, the instrument and equipment... airspeed limitation and item of related information in the Airplane Flight Manual and pertinent placards...

  19. Analysis of licensed South African diagnostic imaging equipment ...

    African Journals Online (AJOL)

    Analysis of licensed South African diagnostic imaging equipment. ... Pan African Medical Journal ... Introduction: Objective: To conduct an analysis of all registered South Africa (SA) diagnostic radiology equipment, assess the number of equipment units per capita by imaging modality, and compare SA figures with published ...

  20. Calibration of laboratory equipment and its intermediate verification

    International Nuclear Information System (INIS)

    Remedi, Jorge O.

    2011-01-01

    When a laboratory wants to prove that he has technical competence to carry out tests or calibrations must demonstrate that it has complied with certain requirements that establish , among others, the mandatory : calibrate or verify equipment before putting it into service in order to ensure that it meets to the specifications of laboratory equipment to keep records evidencing the checks that equipment complies with the specification ; perform intermediate checks for maintain confidence in the calibration status of the equipment , ensure that the operation is checked and calibration status of equipment when the equipment goes outside the direct control of the laboratory , before be returned to service, establish a program and procedure for the calibration of equipment; show how determined the calibration periods of their equipment as well as evidence that intermediate checks are suitable for the calibration periods. However, some confusion is observed as to the meaning of the terms 'calibration' and 'verification' of a computer. This paper analyzes applicable documentation and suggests that the differences are generated in part by translations and by characterization concepts upon its usage, that is, if it is legal metrology or assessment conformity. Therefore, this study aims to characterize both concepts , fundamentals to zoom distinguish , outline appropriate strategies for calibration and verification activities to ensure the compliance with regulatory requirements [es

  1. 21 CFR 1250.67 - Watering equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Watering equipment. 1250.67 Section 1250.67 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... of drinking water or other beverages, or for food preservation purposes, equipment constructed so as...

  2. 47 CFR 18.203 - Equipment authorization.

    Science.gov (United States)

    2010-10-01

    ... information already on file with the Commission. (2) A technical report pursuant to §§ 18.207 and 18.311. (b... 47 Telecommunication 1 2010-10-01 2010-10-01 false Equipment authorization. 18.203 Section 18.203 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL INDUSTRIAL, SCIENTIFIC, AND MEDICAL EQUIPMENT...

  3. 21 CFR 211.65 - Equipment construction.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment construction. 211.65 Section 211.65 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS... construction. (a) Equipment shall be constructed so that surfaces that contact components, in-process materials...

  4. Preventive Rad/Nuc Detection Equipment Categorization for Consequence Management

    Energy Technology Data Exchange (ETDEWEB)

    Buddemeier, B. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Musolino, S. V. [Brookhaven National Lab. (BNL), Upton, NY (United States); Klemic, G. [US Dept. of Homeland Security National Security Technology Lab., New York, NY (United States)

    2017-06-01

    The overall objective of this project is to research, evaluate, and test first responder preventive radiological/nuclear detection equipment (PRND) to provide state and local agencies with guidance on how to best use this equipment for response after a radiological/nuclear release or detonation. While the equipment being tested in this effort has been specifically designed for detection and interdiction operations, the fleet of PRND equipment can help fill critical needs for radiological instrumentation should a consequence management response take place. This effort will provide scientific guidance on the best way to deploy and operate this class of equipment for consequence management missions. With the support of the US Department of Homeland Security’s (DHS) Domestic Nuclear Detection Office (DNDO), PRND equipment has been placed into service at federal, state, and local agencies throughout the nation. If the equipment capability and limitations are taken into account, this large inventory can be repurposed to support the emergency response in the aftermath of a radiological of nuclear event. This report evaluates PRND equipment to define key categories of equipment and the types of missions they can be used for. This is important because there are over 100 different types of PRND equipment, often with significantly different capabilities with respect to the consequence management mission. The current DNDO draft NIMS PRND equipment types were used as a foundation and expanded, when necessary, to address key characteristics important for the consequence mission. Table 1 provides a summary of the PRND instrument categories developed for this effort. Also included on the table are some common response mission detection equipment categories that will be used for capability comparisons.

  5. History and development of the tennis equipment

    OpenAIRE

    Horáková, Kateřina

    2007-01-01

    Title: History and development of the tennis equipment. Aim of the work: Process an integral, tabular and synoptic historical development overview of the tennis equipment. This owerview will cover the period since the early beginnings of the game to present days. Methods: Advance work has historical charakter therefore used methods are historiogaphical methods such as chronological method and historical method. Results: Produce tabular description of the tennis equipment by means of reading a...

  6. 23 CFR 635.106 - Use of publicly owned equipment.

    Science.gov (United States)

    2010-04-01

    ... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.106 Use of publicly owned equipment. (a) Publicly owned equipment should not normally compete with privately owned equipment on a project to be let to contract... publicly owned equipment is to be made available in connection with construction work to be let to contract...

  7. 21 CFR 870.4200 - Cardiopulmonary bypass accessory equipment.

    Science.gov (United States)

    2010-04-01

    ... Cardiopulmonary bypass accessory equipment. (a) Identification. Cardiopulmonary bypass accessory equipment is a... mounting bracket or system-priming equipment. (b) Classification. (1) Class I. The device is classified as class I if it does not involve an electrical connection to the patient. The device is exempt from the...

  8. 14 CFR 125.203 - Communication and navigation equipment.

    Science.gov (United States)

    2010-01-01

    ... within the degree of accuracy required for ATC; (ii) One marker beacon receiver providing visual and... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Communication and navigation equipment. 125... Equipment Requirements § 125.203 Communication and navigation equipment. (a) Communication equipment—general...

  9. Remote handling equipment for CANDU retubing

    International Nuclear Information System (INIS)

    Crawford, G.S.; Lowe, H.

    1993-01-01

    Numet Engineering Ltd. has designed and supplied remote handling equipment for Ontario Hydro's retubing operation of its CANDU reactors at the Bruce Nuclear Generating Station. This equipment consists of ''Retubing Tool Carriers'' an'' Worktables'' which operate remotely or manually at the reactor face. Together they function to transport tooling to and from the reactor face, to position and support tooling during retubing operations, and to deliver and retrieve fuel channels and channel components. This paper presents the fundamentals of the process and discusses the equipment supplied in terms of its design, manufacturing, components and controls, to meet the functional and quality requirements of Ontario Hydro's retubing process. (author)

  10. Performance Measurement of Mining Equipments by Utilizing OEE

    Directory of Open Access Journals (Sweden)

    Sermin Elevli

    2010-10-01

    Full Text Available Over the past century, open pit mines have steadily increased their production rate by using larger equipments which requireintensive capital investment. Low commodity prices have forced companies to decrease their unit cost by improving productivity. Oneway to improve productivity is to utilize equipment as effectively as possible. Therefore, the accurate estimation of equipmenteffectiveness is very important so that it can be increased. Overall Equipment Effectiveness (OEE is a well-known measurementmethod, which combines availability, performance and quality, for the evaluation of equipment effectiveness in manufacturing industry.However, there isn’t any study in literature about how to use this metric for mining equipments such as shovel, truck, drilling machineetc. This paper will discuss the application of OEE to measure effectiveness of mining equipment. It identifies causes of time losses forshovel and truck operations and introduces procedure to record time losses. The procedure to estimate OEE of shovels and trucks hasalso been presented via numerical example.

  11. 7 CFR 58.419 - Curd mill and miscellaneous equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Curd mill and miscellaneous equipment. 58.419 Section... Service 1 Equipment and Utensils § 58.419 Curd mill and miscellaneous equipment. Knives, hand rakes... of the curd mill should be of stainless steel. All pieces of equipment shall be so constructed that...

  12. Anesthetic equipment, facilities and services available for pediatric ...

    African Journals Online (AJOL)

    2011-04-09

    Apr 9, 2011 ... standards and increased use of disposable anesthetic equipment. An audit of equipment and facilities for anesthetic care in pediatric patients is important and should be carried out periodically to appraise the situation for upgrading of essential anesthetic facilities and equipment. Appendix A. 18th March, ...

  13. 14 CFR 91.213 - Inoperative instruments and equipment.

    Science.gov (United States)

    2010-01-01

    ... specific operations by this part. (c) A person authorized to use an approved Minimum Equipment List issued... a master minimum equipment list has not been developed; or (ii) Small rotorcraft, nonturbine-powered small airplane, glider, or lighter-than-air aircraft for which a Master Minimum Equipment List has been...

  14. 21 CFR 211.67 - Equipment cleaning and maintenance.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment cleaning and maintenance. 211.67 Section 211.67 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... Equipment cleaning and maintenance. (a) Equipment and utensils shall be cleaned, maintained, and, as...

  15. 42 CFR 409.14 - Supplies, appliances, and equipment.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Supplies, appliances, and equipment. 409.14 Section... Hospital Services § 409.14 Supplies, appliances, and equipment. (a) Except as specified in paragraph (b) of this section, Medicare pays for supplies, appliances, and equipment as inpatient hospital or inpatient...

  16. Partners in qualified equipment supply

    International Nuclear Information System (INIS)

    Rygg, D.E.; O'Hare, G.J.

    1993-01-01

    Industry initiatives have been taken to improve procurement practices and commercial dedication programs, formation of procurement engineering groups, emphasis on product quality, and increased engineering involvement in procurement and maintenance of qualified equipment. This poses new challenges for many licensees in terms of resources, product knowledge, and access to information normally held proprietary by equipment suppliers. Alternative approaches to future licensee/Westinghouse relationships which will allow licensees to adapt to the changing environment are discussed. 2 figs

  17. Nuclear electronic equipment for control and monitoring boards. Susceptibility of nuclear electronic pulse equipment to interference

    International Nuclear Information System (INIS)

    Buisson, Jacques; Cochinal, R.; Duquesnoy, J.; Roquefort, H.

    1972-07-01

    The correct functioning of pulse measurement units in industrial environmental conditions where interference is high, frequently gives rise to many installation problems which are difficult to solve. This paper offers some recommendations with a view to minimising the effect to electric interference on electronic equipment and gives a test method which enables this effect to be assessed qualitatively. It has been devised for nuclear electronic instrumentation but it may also be applied to other equipment and in particular the test method may be used for other cases. After a few preliminaries on how interference acts and on the terminology, the design of the equipment and the recommended connections are mentioned. Test methods are then indicated, followed by various technical comments. (author) [fr

  18. Equipment Replacement Decision Making: Opportunities and Challenges

    OpenAIRE

    Fan, Wei (David); Gemar, Mason D.; Machemehl, Randy

    2012-01-01

    The primary function of equipment managers is to replace the right equipment at the right time and at the lowest overall cost. In this paper, the opportunities and challenges associated with equipment replacement optimization (ERO) are discussed in detail. First, a comprehensive review of the state-of-the art and state-of-the practice literature for the ERO problem is conducted. Second, a dynamic programming (DP) based optimization solution methodology is presented to solve the ERO problem. T...

  19. 14 CFR 23.1441 - Oxygen equipment and supply.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Oxygen equipment and supply. 23.1441... Miscellaneous Equipment § 23.1441 Oxygen equipment and supply. (a) If certification with supplemental oxygen..., during the flight, the quantity of oxygen available in each source of supply. (d) Each required flight...

  20. Design by analysis of composite pressure equipment

    International Nuclear Information System (INIS)

    Durand, S.; Mallard, H.

    2004-01-01

    Design by analysis has been particularly pointed out by the european pressure equipment directive. Advanced mechanical analysis like finite element method are used instead of classical design by formulas or graphs. Structural behaviour can be understood by the designer. Design by analysis of metallic pressure equipments is widely used. Material behaviour or limits analysis is based on sophisticated approach (elasto-plastic analysis,..). Design by analysis of composite pressure equipments is not systematically used for industrial products. The difficulty comes from the number of information to handle. The laws of mechanics are the same for composite materials than for steel. The authors want to show that in design by analysis, the composite material approach is only more complete than the metallic approach. Mechanics is more general but not more complicated. A multi-material approach is a natural evolution of design by analysis of composite equipments. The presentation is illustrated by several industrial cases - composite vessel: analogy with metallic calculations; - composite pipes and fittings; - welding and bounding of thermoplastic equipments. (authors)

  1. Resistance welding equipment manufacturing capability for exports

    Energy Technology Data Exchange (ETDEWEB)

    Sastry, V.S.; Raju, Y.S.; Somani, A.K.; Setty, D.S.; Rameswara Raw, A.; Hermantha Rao, G.V.S.; Jayaraj, R.N. [Nuclear Fuel Complex, Dept. of Atomic Energy, Hyderbad (India)

    2010-07-01

    Indian Pressurised Heavy Water Reactor (PHWR) fuel bundle is fully welded and is unique in its design. Appendage welding, end closure welding, and end plate welding is carried out using resistance welding technique. Out of many joining processes available, resistance-welding process is reliable, environment friendly and best suitable for mass production applications. Nuclear Fuel Complex (NFC), an industrial unit is established in Hyderabad, under the aegis of the Dept of Atomic Energy to manufacture fuel for Pressurised Heavy Water Reactors. From inception, NFC has given importance for self-reliance and indigenization with respect to manufacturing process and equipment. Sintering furnaces, centreless grinders, appendage-welding machines, end-closure welding equipment and end-plate welding equipments, which were initially imported, are either indigenized or designed and manufactured in house. NFC has designed, manufactured a new appendage-welding machine for manufacturing 37 element fuel bundles. Recently NFC has bagged an order from IAEA through international bidding for design, manufacture, supply, erection and commissioning of end-closure welding equipment. The paper gives in detail the salient features of these welding equipment. (author)

  2. Seismic qualification of nuclear equipment under multiple support excitations

    International Nuclear Information System (INIS)

    Neelwarne, A.; Kushwaha, H.S.; Kakodkar, A.

    1991-01-01

    ERS (Envelop Response Spectrum) is a conservative method for seismic analysis of equipment without overhang whereas it may severely underestimate the response, as compared to the time history response, for the case of overhanging equipment. However, MSRS (Multi Support Response Spectrum) method appears to give conservative results for both class of equipment. Inability to account a) magnification of response and b) contribution of antisymmetric modes resulting from relative support motion are found to be the reasons for unconservatism of ERS method. A simple criterion for selection of proper method, between ERS and MSRS, for the analysis of overhanging equipment is developed. The criterion is based on correlation of modal mass with the modal normal coordinate and is applicable to generalised equipment of non uniform mass and stiffness distribution. It is shown that; 1) MSRS method must be adopted if equipment first mode corresponds to vibration of overhanging masses. 2) MSRS method should be adopted if the modal mass for the first mode is less than 15 % of equipment mass. 3) Algebraic support group combination appears to give realistic results for the analysis of equipment. This is due to the dominant cantilever beam like behaviour of primary structure resulting in near in-phase motion at equipment supports. (author)

  3. Remote equipment technology. Final report for GFY 1880

    International Nuclear Information System (INIS)

    Wadekamper, D.C.

    1980-09-01

    An interactive graphics terminal and a desk-top computer were utilized to perform a Computer Aided Remote Maintenance simulation of a hypothetical equipment item. The equipment item included an electrical connection, hydraulic fitting, and simple bolt pattern which were maintained by remote manipulators during the simulation. These remote maintenance operations demonstrated that the Computer Aided Remote Maintenance simulation technology could be extended to complex equipment items. As a result, these equipment items can be evaluated from the standpoint of remote operation and maintenance prior to purchase or installation in a remote processing or cell arrangement

  4. Drawing evaluation report for sampling equipment drawings; TOPICAL

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    This document presents the results of a task to evaluate Tank Waste Remediation System (TWRS) sampling equipment drawings and identifies drawings category as either essential, support, or general drawings. This report completes the drawing evaluation task as outlined in Engineering Task Plan For Truck 3 and 4 Drawing Compliance and Evaluation (Wilson, 1997). The scope of this report is limited to an evaluation and identification of drawing category for drawings of certain tank waste sampling equipment for which the TRWS Characterization Project has been assigned custody, including: vapor sampling, grab sampling, auger sampling, and all core sampling equipment (see LMHC Task Order 304). This report does not address drawings for other waste tank deployed equipment systems having similar assigned custody, such as, Light Duty Utility Arm (LDUA), Cone Penetrometer system, or Long Length Contaminated Equipment (LLCE). The LDUA drawings are addressed in the Characterization Equipment Essential Drawings (HNF 1998). The Cone Penetrometer system drawings which are vendor drawings (not H- series) is not currently turned over to operations for deployment. The LLCE equipment was just recently assigned to Characterization Project and were not included in the original scope for this evaluation and will be addressed in the evaluation update scheduled for fiscal year 1999

  5. Functional Requirements for Continuation Period Equipment and Drilling

    International Nuclear Information System (INIS)

    Sweeney, J.J.

    2000-01-01

    For geophysical measurements, creating a functional requirement based on finding a specific-sized target at a specific depth is difficult because of the wide variation of subsurface and surface geologic conditions that can be encountered. An alternative approach used in this paper is to specify functional requirements based on what is needed to search for the effects of a given target within a reasonable background of environmental or geological variation (noise). There is a gap between what the state-of-the-art expert with a large amount of experience can be expected to accomplish and what a non-expert inspector with limited experience can do. There are also limitations because of the Treaty environment (equipment certification, transparency, managed access, etc.); thus, for OSI, we must opt for pragmatic approach. Equipment must be easy to use, rugged, and functional over a wide range of environmental conditions. Equipment should consist of commercially available technology. Well-established operational procedures should be used for taking measurements, reducing data, and presenting data, with software mostly provided by the manufacturer along with the equipment. Equipment should be used in conjunction with WGB-approved position-finding equipment capable of relative position determinations pertinent to the type of equipment and measurement

  6. DWPF liquid sample station: Status of equipment development

    International Nuclear Information System (INIS)

    Caplan, J.R.

    1987-01-01

    This report summarizes operating experience and equipment status of the DWPF liquid sample cell. Operation hours to date, results of equipment inspections and problems encountered and their solutions are discussed. An equipment and instrumentation status updating DPST-85-592, DWPF LIQUID SAMPLE CELL MOCK-UP, is presented. Remaining development items are also outlined

  7. Personal protective equipment

    International Nuclear Information System (INIS)

    2004-01-01

    This Practical Radiation Technical Manual is one of a series that has been designed to provide guidance on radiological protection for employers, radiation protection officers, managers and other technically competent persons who have responsibility for ensuring the safety of employees working with ionizing radiation. The Manual may be used with the appropriate IAEA Practical Radiation Safety Manuals to provide training, instruction and information for all employees engaged in work with ionizing radiation. Personal protective equipment (PPE) includes clothing or other special equipment that is issued to individual workers to provide protection against actual or potential exposure to ionizing radiations. It is used to protect each worker against the prevailing risk of external or internal exposure in circumstances in which it is not reasonably practicable to provide complete protection by means of engineering controls or administrative methods. Adequate personal protection depends on PPE being correctly selected, fitted and maintained. Appropriate training for the users and arrangements to monitor usage are also necessary to ensure that PPE provides the intended degree of protection effectively. This Manual explains the principal types of PPE, including protective clothing and respiratory protective equipment (RPE). Examples of working procedures are also described to indicate how PPE should be used within a safe system of work. The Manual will be of most benefit if it forms part of a more comprehensive training programme or is supplemented by the advice of a qualified expert in radiation protection. Some of the RPE described in this Manual should be used under the guidance of a qualified expert

  8. Remotely operated replaceable process equipment

    International Nuclear Information System (INIS)

    Westendorf, H.

    1987-01-01

    The coupling process of pneumatic and electrical auxiliary lines of a pneumatic control pressure line in a large cell of the reprocessing plant is carried out, together with the coupling process of the connecting flange of the process equipment. The coupling places of the auxiliary lines, such as control or supply lines, are laid in the flange parts of the flanges to be connected. The pipe flange on the frame side remains flush with the connecting flange of the process equipment. (DG) [de

  9. 49 CFR 1242.49 - Equipment damaged (account XX-27-48).

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Equipment damaged (account XX-27-48). 1242.49...-Equipment § 1242.49 Equipment damaged (account XX-27-48). Separate common expenses according to distribution... equipment and work and other non-revenue equipment accounts (accounts XX-27-40, XX-27-45, XX-27-46, and XX...

  10. Emergency team personnel and technical equipment

    International Nuclear Information System (INIS)

    Muralt, R.

    1989-01-01

    The most important requirements for the emergency team can be summarized in three points. 1) The emergency team must be made up of top personnel from all fields and it should be functionally equiped. 2) The emergency teams must have complete command of their equipment. 3) The members of the team must be well motivated. 1 fig

  11. Remote maintenance lessons learned on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    A major objective of the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory is to develop and demonstrate the technology required to reprocess spent nuclear fuel. The Fuel Recycle Division, over the past 16 years, has undertaken this objective by designing and testing prototypical hardware representing essentially every major equipment item currently included in most fuel reprocessing plant conceptual designs. These designs are based on total remote maintenance to increase plant availability and reduce radiation exposure to plant operators. The designs include modular equipment to facilitate maintainability and the remote manipulation necessary to accomplish maintenance tasks. Prototypic equipment has been installed and tested in a cold mock-up of a reprocessing hot cell, called the remote operations and maintenance demonstration facility. The applied maintenance concept utilizes the dexterity and mobility of bridge-mounted, force-reflecting servomanipulators. Prototypic processing equipment includes a remote disassembly system, a remote shear system, a rotary dissolver, a remote automated sampler system, removable equipment racks to support chemical process equipment items, and the advanced servomanipulators. Each of these systems and a brief description of functions are discussed

  12. [Legionella pneumonia after the use of CPAP equipment].

    Science.gov (United States)

    Stolk, Jaap M; Russcher, Anne; van Elzakker, Erika P M; Schippers, Emile F

    2016-01-01

    Continuous positive airway pressure (CPAP) equipment can be colonised by Legionellae and might cause Legionella pneumonia in the user. However, there is no reported case of Legionella pneumonia related to CPAP equipment in which an identical Legionella was found in both the patient and the CPAP equipment. A 51-year-old man came to the Emergency Department with fever, confusion and dyspnoea that had been present for 3 days. His medical history included obstructive sleep apnoea, for which he had been using CPAP therapy at home for 10 weeks. The CPAP equipment showed signs of poor maintenance. Chest X-ray revealed a pulmonary consolidation. Laboratory investigation resulted in a positive urine antigen test for Legionella. Water from the CPAP equipment and sputum from the patient revealed Legionella pneumophila. Serotyping and sequence-based typing showed an identical L. pneumophila serotype 1 ST37. It is important to be aware that CPAP equipment can be colonised with Legionellae and might cause Legionella pneumonia. It is therefore necessary to ask about CPAP therapy in a patient with community-acquired pneumonia.

  13. CERN computing equipment for Senegal

    CERN Multimedia

    Anaïs Schaeffer

    2014-01-01

    On 26 May, CERN once again had the honour of donating computing equipment to a foreign institute.   This time, around 100 servers and five network hubs were sent to Senegal, making it the seventh country, after Morocco, Ghana, Bulgaria, Serbia, Egypt and the Philippines, to receive a donation of computing equipment from the Organization. The official ceremony was held at CERN on 26 May in the presence of the Director-General, Rolf Heuer, and Senegal's ambassador to Geneva, Fodé Seck, who both expressed their enthusiasm for the project. The equipment is intended for Cheikh Anta Diop University (UCAD) in Dakar and will be of particular use to students attending the African School of Fundamental Physics and its Applications (ASP 2014) taking place from 3 to 23 August, for which CERN is a partner. The ASP allows a large number of African students to hone their skills in high-energy physics and to forge professional links with fellow physicists in Africa and Europe. ...

  14. The application and practice of predictive maintenance at CANDU equipment management

    International Nuclear Information System (INIS)

    Yu Guangting

    2014-01-01

    The equipment in Qinshan CANDU unit is characterized by large number and complex structure. Some equipment failure has no relation with the operation time, it is impossible to avoid the failure of these equipment only by periodical maintenance. To improve the equipment reliability, increase the equipment usability and decrease the maintenance cost, for important equipment related to nuclear safety and generating electricity, it is required to perform condition monitoring and the predictive maintenance (PdM). According to different characteristics of equipment, it is required to use suitable equipment condition monitoring method, content and frequency. In this way, some potential equipment failure can be found, preventive maintenance can be arranged in advance, and equipment maintenance management can be optimized. (author)

  15. Method and equipment for treating waste water resulting from the technological testing processes of NPP equipment

    International Nuclear Information System (INIS)

    Radulescu, M. C.; Valeca, S.; Iorga, C.

    2016-01-01

    Modern methods and technologies coupled together with advanced equipment for treating residual substances resulted from technological processes are mandatory measures for all industrial facilities. The correct management of the used working agents and of the all wastes resulted from the different technological process (preparation, use, collection, neutralization, discharge) is intended to reduce up to removal of their potential negative impact on the environment. The high pressure and temperature testing stands from INR intended for functional testing of nuclear components (fuel bundles, fuelling machines, etc.) were included in these measures since the use of oils, demineralized water chemically treated, greases, etc. This paper is focused on the method and equipment used at INR Pitesti in the chemical treatment of demineralized waters, as well as the equipment for collecting, neutralizing and discharging them after use. (authors)

  16. Interventional suite and equipment management: cradle to grave

    Energy Technology Data Exchange (ETDEWEB)

    Strauss, Keith J. [Harvard Medical School, Radiology Physics and Engineering, Children' s Hospital Boston, Boston, MA (United States)

    2006-09-15

    The acquisition process for interventional equipment and the care that this equipment receives constitute a comprehensive quality improvement program. This program strives to (a) achieve the production of good image quality that meets clinical needs, (b) reduce radiation doses to the patient and personnel to their lowest possible levels, and (c) provide overall good patient care at reduced cost. Interventional imaging equipment is only as effective and efficient as its supporting facility. The acquisition process of interventional equipment and the development of its environment demand a clinical project leader who can effectively coordinate the efforts of the many professionals who must communicate and work effectively on this type of project. The clinical project leader needs to understand (a) clinical needs of the end users, (b) how to justify the cost of the project, (c) the technical needs of the imaging and all associated equipment, (d) building and construction limitations, (e) how to effectively read construction drawings, and (f) how to negotiate and contract the imaging equipment from the appropriate vendor. After the initial commissioning of the equipment, it must not be forgotten. The capabilities designed into the imaging device can be properly utilized only by well-trained operators and staff who were initially properly trained and receive ongoing training concerning the latest clinical techniques throughout the equipment's lifetime. A comprehensive, ongoing maintenance and repair program is paramount to reducing costly downtime of the imaging device. A planned periodic maintenance program can identify and eliminate problems with the imaging device before these problems negatively impact patient care. (orig.)

  17. Interventional suite and equipment management: cradle to grave

    International Nuclear Information System (INIS)

    Strauss, Keith J.

    2006-01-01

    The acquisition process for interventional equipment and the care that this equipment receives constitute a comprehensive quality improvement program. This program strives to (a) achieve the production of good image quality that meets clinical needs, (b) reduce radiation doses to the patient and personnel to their lowest possible levels, and (c) provide overall good patient care at reduced cost. Interventional imaging equipment is only as effective and efficient as its supporting facility. The acquisition process of interventional equipment and the development of its environment demand a clinical project leader who can effectively coordinate the efforts of the many professionals who must communicate and work effectively on this type of project. The clinical project leader needs to understand (a) clinical needs of the end users, (b) how to justify the cost of the project, (c) the technical needs of the imaging and all associated equipment, (d) building and construction limitations, (e) how to effectively read construction drawings, and (f) how to negotiate and contract the imaging equipment from the appropriate vendor. After the initial commissioning of the equipment, it must not be forgotten. The capabilities designed into the imaging device can be properly utilized only by well-trained operators and staff who were initially properly trained and receive ongoing training concerning the latest clinical techniques throughout the equipment's lifetime. A comprehensive, ongoing maintenance and repair program is paramount to reducing costly downtime of the imaging device. A planned periodic maintenance program can identify and eliminate problems with the imaging device before these problems negatively impact patient care. (orig.)

  18. Equipment for x- and gamma ray radiography

    International Nuclear Information System (INIS)

    Abd Nasir Ibrahim; Azali Muhammad; Ab Razak Hamzah; Abd Aziz Mohamed; Mohammad Pauzi Ismail

    2004-01-01

    The following topics related to the equipment for x - and gamma ray radiography are discussed in this chapter. The topics are x-ray source for Industrial Radiography: properties of x-ray, generation of x-ray, mechanism of x-ray production, x-ray equipment, power supply, distribution of x-ray intensity along the tube: gamma ray source for Industrial Radiography: properties of gamma rays, gamma ray sources, gamma ray projectors on cameras, source changing. Care of Radiographic Equipments: Merits and Demerits of x and Gamma Rays

  19. Laser-based measuring equipment controlled by microcomputer

    International Nuclear Information System (INIS)

    Miron, N.; Sporea, D.; Velculescu, V.G.; Petre, M.

    1988-03-01

    Some laser-based measuring equipment controlled by microcomputer developed for industrial and scientific purposes are described. These equipments are intended for dial indicators verification, graduated rules measurement, and for very accurate measurement of the gravitational constant. (authors)

  20. Mechanical (turbines and auxiliary equipment)

    CERN Document Server

    Sherry, A; Cruddace, AE

    2013-01-01

    Modern Power Station Practice, Volume 3: Mechanical (Turbines and Auxiliary Equipment) focuses on the development of turbines and auxiliary equipment used in power stations in Great Britain. Topics covered include thermodynamics and steam turbine theory; turbine auxiliary systems such as lubrication systems, feed water heating systems, and the condenser and cooling water plants. Miscellaneous station services, and pipework in power plants are also described. This book is comprised of five chapters and begins with an overview of thermodynamics and steam turbine theory, paying particular attenti

  1. Development of electric discharge equipment for small specimen sampling

    International Nuclear Information System (INIS)

    Okamoto, Koji; Kitagawa, Hideaki; Kusumoto, Junichi; Kanaya, Akihiro; Kobayashi, Toshimi

    2009-01-01

    We have developed the on-site electric discharge sampling equipment that can effectively take samples such as small specimens from the surface portion of the plant components. Compared with the conventional sampling equipment, our sampling equipment can take samples that are thinner in depth and larger in area. In addition, the affection to the equipment can be held down to the minimum, and the thermally-affected zone of the material due to electric discharge is small, which is to be ignored. Therefore, our equipment is excellent in taking samples for various tests such as residual life evaluation.

  2. Maintenance and fabrication of nuclear electronic equipment

    International Nuclear Information System (INIS)

    Hong, Seok Boong; Chung, Chong Eun; Hwang, In Koo; Koo, In Soo; Park, Bum; Kim, Soo Hee; Lee, Seong Joo; Kim, Min Seok; Choi, Wha Lim

    2011-12-01

    - process equipment at PIEF, Chemical Analysis Team and RWFTF have been calibrated. - The electronic equipment and radiation equipment at RWTF and PIEF have been prepared. - Development and installation of integrated RMS software for Hanaro Cold Neutron Laboratory Building(CNLB) RMS, and development and performance upgrade of a portal monitor for CNLB. - Performance test of the Hardware/Software of digital unit controller has been performed, and functional upgrade of the Hardware/Software of stimulator for SMART MMIS performance test facility has also been performed. - A controller of high voltage power supply for a small electron beam generator and a controller for razer pinning and a remote monitoring apparatus of cathode power supply for a 0.2 Mev. small electron beam generator have been designed and fabricated. - Database construction for effective maintenance for the process equipment and radiation instruments are designed and constructed

  3. VIRTUAL ELECTRONIC COMPONENTS OF THE ELECTRONIC EQUIPMENT

    Directory of Open Access Journals (Sweden)

    E. Lazarevich

    2013-01-01

    Full Text Available The article is present new idea of the creation, developments and improvements of the electronic equipment of complex systems by means of the virtual electronic components. The idea of the virtual electronic components is a presentation and perception of the creation and developments of the equipment on two forming: real – in the manner of standard marketed block of the intellectual property and image – in the manner of virtual component. The real component in most cases slows the development of the electronic equipment. The imaginary component is the «locomotive» of development of the electronic equipment. The Imaginary component contains the scientific has brushed against developer. The scientific has brushed against developer reveals of itself in the manner of virtual component on the modern level of the design rates of microelectronics.

  4. Development of nuclear equipment qualification technology

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Heon O; Kim, Wu Hyun; Kim, Jin Wuk; Kim, Jeong Hyun; Lee, Jeong Kyu; Kim, Yong Han; Jeong, Hang Keun [Korea Institute of Machinery and Materials, Taejon (Korea)

    1999-03-01

    In order to enhance testing and evaluation technologies, which is one of the main works of the Chanwon branch of KIMM(Korea Institute of Machinery and Materials), in addition to the present work scope of the testing and evaluation in the industrial facilities such as petroleum and chemical, plants, the qualification technologies of the equipments important to safety used in the key industrial facilities such as nuclear power plants should be localized: Equipments for testing and evaluation is to be set up and the related technologies must be developed. In the first year of this study, of vibration aging qualification technologies of equipments important to safety used in nuclear power plants have been performed. (author). 27 refs., 81 figs., 17 tabs.

  5. Methods of equipment choice in shotcreting

    Science.gov (United States)

    Sharapov, R. R.; Yadykina, V. V.; Stepanov, M. A.; Kitukov, B. A.

    2018-03-01

    Shotcrete is widely used in architecture, hydraulic engineering structures, finishing works in tunnels, arc covers and ceilings. The problem of the equipment choice in shotcreting is very important. The main issues influencing the equipment choice are quality improvement and intensification of shotcreting. Main parameters and rational limits of technological characteristic of machines used in solving different problems in shotcreting are described. It is suggested to take into account peculiarities of shotcrete mixing processes and peculiarities of applying these mixtures with compressed air kinetic energy. The described method suggests choosing a mixer with the account of energy capacity, Reynolds number and rotational frequency of the mixing drum. The suggested choice procedure of the equipment nomenclature allows decreasing exploitation costs, increasing the quality of shotcrete and shotcreting in general.

  6. Equipment for light therapy BIOFIE family

    International Nuclear Information System (INIS)

    Corcho Corcho, C. A.; Perez Garcia, A.; Herrera Rodriguez, R.

    2016-01-01

    The development experienced in the design and implementation of equipment are presented, within the subject matter of the application of low level laser and also them LED of high efficiency with therapeutic purposes in health and also in animal health, besides, the use of this technology for this application in agriculture. All the equipment that show up has been developed for the Dpto. of Bioengineer of High Politechnical Institute Jose A. Echeverria (CUJAE) in association with Dpto. of Prototypes of the same institution, under the trademark BIOFIE. Like fundamental and innovative characteristic we can make a comment that all equipment destined to health and animal health, work on continuos and modulated signal mode, using in this mode different bio frequencies. (Author)

  7. Maintenance and fabrication of electronic equipment

    International Nuclear Information System (INIS)

    Chung, Chong Eun; Moon, Byung Soo; Hong, Suk Boong; Kim, Yong Keun; Kim, Jung Bok

    2003-12-01

    Development of radiation monitoring equipment could be the base of domestic development of RMS. And the technique could be adapted to development of other radiation equipment of KAERI as well as hospitals and nuclear power plants. The RMS technology could be adapted to the development of precision instruments related to nuclear radiation and be the base of fundamental technology such as protein structure analysis of bio technology, development of nano advanced material and aircraft material. The technology of multi-channel readout ASIC for nuclear radiation detector, which has been imported from abroad, could be adapted to development of radiation equipment for image processing, position of detection, NDT etc., and also the technique will be expected to contribute to increase the use of radiation technology to industrial applications

  8. Head-end reprocessing equipment remote maintenance demonstration

    International Nuclear Information System (INIS)

    Evans, J.H.; Metz, C.F. III.

    1989-01-01

    Prototype equipment for reprocessing breeder reactor nuclear fuel was installed in the Remote Operation and Maintenance Demonstration (ROMD) area of the Consolidated Fuel Reprocessing Program (CFRP) facility at the Oak Ridge National Laboratory (ORNL) in order to evaluate the design of this equipment in a cold mock-up of a remotely maintained hot cell. This equipment included the Remote Disassembly System (RDS) and the Remote Shear System (RSS). These systems were disassembled and reassembled remotely by using the extensive remote handling systems that are installed in this simulated hot-cell environment. 5 refs., 5 figs

  9. Incidents of chemical reactions in cell equipment

    Energy Technology Data Exchange (ETDEWEB)

    Baldwin, N.M.; Barlow, C.R. [Uranium Enrichment Organization, Oak Ridge, TN (United States)

    1991-12-31

    Strongly exothermic reactions can occur between equipment structural components and process gases under certain accident conditions in the diffusion enrichment cascades. This paper describes the conditions required for initiation of these reactions, and describes the range of such reactions experienced over nearly 50 years of equipment operation in the US uranium enrichment program. Factors are cited which can promote or limit the destructive extent of these reactions, and process operations are described which are designed to control the reactions to minimize equipment damage, downtime, and the possibility of material releases.

  10. [Development of Hospital Equipment Maintenance Information System].

    Science.gov (United States)

    Zhou, Zhixin

    2015-11-01

    Hospital equipment maintenance information system plays an important role in improving medical treatment quality and efficiency. By requirement analysis of hospital equipment maintenance, the system function diagram is drawed. According to analysis of input and output data, tables and reports in connection with equipment maintenance process, relationships between entity and attribute is found out, and E-R diagram is drawed and relational database table is established. Software development should meet actual process requirement of maintenance and have a friendly user interface and flexible operation. The software can analyze failure cause by statistical analysis.

  11. The replace repair decision for heavy equipment.

    Science.gov (United States)

    2004-01-01

    The fleet of equipment operated by the Virginia Department of Transportation (VDOT) constitutes a large investment, on the order of half a billion dollars. A means of identifying earlier and more accurately those pieces of equipment whose timely repl...

  12. Underground coal equipment

    Energy Technology Data Exchange (ETDEWEB)

    Chadwick, J.

    2002-12-01

    This paper reports on increasing automation and enhanced productivity on longwalls, new development cutting and bolting technologies and haulage systems. Amongst equipment discussed is DBT's Electra series EL3000 shearer, the Dosco LH1400 roadheader with onboard bolters, and Joy 12 CM30 continuous miners. 4 photos.

  13. 7 CFR 58.131 - Equipment and facilities.

    Science.gov (United States)

    2010-01-01

    .... Receiving stations shall comply with the applicable sections of this subpart covering premises, buildings, facilities, equipment, utensils, personnel, cleanliness and health. (2) Transfer stations. Transfer stations... equipment, piping and utensils and personnel—cleanliness and health. As climatic and operating conditions...

  14. Tracking Unmanned Aerial Vehicle CTU FTS - Application of equipment

    Directory of Open Access Journals (Sweden)

    David Hůlek

    2015-10-01

    Full Text Available Article which is about the Tracking Unmanned Aerial Vehicle continues in the description of the project development dealing with the utilization of the UAV (unmanned aerial vehicle. Documentation of the project progresses builds on the previous article. In that article the selection of observation and transmission equipment was summarized. In the article, the reader learns about an installation of the equipment on the UAV (helicopter, about an interconnection of the equipment to create complete and functional system, about testing of the UAV, about the solutions of the problems which came into being during testing and about protection of the equipment against unfavourable effects. The location of equipment on the unmanned vehicle was chosen after a considering of several parameters. These parameters are preservation of the functionality or an influence to the balance. To find out how the added equipment affect the centre of gravity of the UAV the tabular method of the centre of gravity calculation was used. The results of the existing work on the project are location and attaching of the equipment to the unmanned vehicle, balance of the unmanned vehicle, solutions of the problems coming into being during the testing and design of the equipment protection against unfavourable effects.

  15. The development of superconducting equipment

    CERN Document Server

    Ueda, T; Hiue, H

    2003-01-01

    Fuji Electric has been developing various types of superconducting equipment for over a quarter of a century. This paper describes the development results achieved for superconducting equipment and especially focuses on large-capacity current leads and superconducting transmission systems, the development of which is being promoted for application to the field of nuclear fusion. High temperature superconductor (HTS) is becoming the mainstream in the field of superconductivity, and the HTS floating coil and conduction-cooled HTS transformed are also introduced as recent developments for devices that utilize this technology. (author)

  16. On-site equipment and materials against CBRNE terrorism

    International Nuclear Information System (INIS)

    Yamamoto, Soichiro; Tokita, Kenichi

    2016-01-01

    There is no almighty field service equipment that can handle by itself all CBRNE (Chemical, Biological, Radiological, Nuclear, Explosive) terrorism. Since there is merit and demerit for each of equipment, operation methods and linkage of material/equipment based on detection principle are indispensable. This paper explained the principle and operation method of detection equipment, operation using multiple material/equipment, and system construction to facilitate cooperation with related ministries and agencies. There are six examples as typical material/equipment and detection principle for handling CBRNE as shown below: (1) ion mobility spectrometer, (2) infrared spectroscopy, (3) Raman scattering spectroscopy, (4) gas chromatographic mass spectrometry, (5) fluorescent reactive dye classification method, and (6) antigen antibody reaction method. This paper shows a flowchart that can measure within the duration of a respirator while wearing Level A protective clothing (about 15 to 20 min) by the combination of detector/analyzer based on these methods. The authors developed an information system that allows prompt information exchange between the on-site administrative agencies, research institutes, and other related organizations via network, in the case when substances etc. could not be specified in the above flowchart. (A.O.)

  17. Equipment specifications for an electrochemical fuel reprocessing plant

    International Nuclear Information System (INIS)

    Hemphill, Kevin P.

    2010-01-01

    Electrochemical reprocessing is a technique used to chemically separate and dissolve the components of spent nuclear fuel, in order to produce new metal fuel. There are several different variations to electrochemical reprocessing. These variations are accounted for by both the production of different types of spent nuclear fuel, as well as different states and organizations doing research in the field. For this electrochemical reprocessing plant, the spent fuel will be in the metallurgical form, a product of fast breeder reactors, which are used in many nuclear power plants. The equipment line for this process is divided into two main categories, the fuel refining equipment and the fuel fabrication equipment. The fuel refining equipment is responsible for separating out the plutonium and uranium together, while getting rid of the minor transuranic elements and fission products. The fuel fabrication equipment will then convert this plutonium and uranium mixture into readily usable metal fuel.

  18. Research on Application of FMECA in Missile Equipment Maintenance Decision

    Science.gov (United States)

    Kun, Wang

    2018-03-01

    Fault mode effects and criticality analysis (FMECA) is a method widely used in engineering. Studying the application of FMEA technology in military equipment maintenance decision-making, can help us build a better equipment maintenance support system, and increase the using efficiency of weapons and equipment. Through Failure Modes, Effects and Criticality Analysis (FMECA) of equipment, known and potential failure modes and their causes are found out, and the influence on the equipment performance, operation success, personnel security are determined. Furthermore, according to the synthetical effects of the severity of effects and the failure probability, possible measures for prevention and correction are put forward. Through replacing or adjusting the corresponding parts, corresponding maintenance strategy is decided for preventive maintenance of equipment, which helps improve the equipment reliability.

  19. Reconciliation of equipment flexibility effects on piping system dynamic response

    International Nuclear Information System (INIS)

    Geraets, L.H.

    1987-01-01

    Piping systems are connected to equipment; if the equipment cannot be considered as ''rigid'' relative to excitation frequencies, nozzle response spectra techniques, or equipment modeling techniques are used. If the equipment is considered rigid, a fixed anchor is assumed. However, occasionally after (seismic) dynamic analysis has been completed, tests or detailed equipment dynamic analyses demonstrate that the assumption of ''infinite stiff'' is questionable. This paper reviews several classes of equipment (pumps, vessels, reservoirs, heat exchangers), and the associated (piping stresses, support loads, equipment nozzle allowables). Significant divergences between design and ''as built'' results are shown (for heat exchangers in particular). The paper discusses the reconciliation process performed for a belgian PWR plant through the use of less conservative seismic damping data (Code Case N-411)

  20. Benefits of Digital Equipment Generic Qualification Activities

    International Nuclear Information System (INIS)

    Thomas, James E.; Steiman, Samuel C.

    2002-01-01

    As a result of nuclear power plant instrumentation and control obsolescence issues, there have been numerous activities during recent years relating to the qualification of digital equipment. Some of these activities have been 'generic' in nature in that the qualification was not limited to plant specific applications, but was intended to cover a broad base of potential applications of the digital equipment. These generic qualifications have been funded by equipment manufacturers and by utility groups and organizations. The generic activities sponsored by the Electric Power Research Institute (EPRI) have been pilot projects for an overall generic qualification approach. The primary benefit resulting from the generic qualification work to date is that a number of digital platforms and digital devices are now available for use in various nuclear safety-related applications. Many of the tests and evaluations necessary to support plant specific applications have been completed. The amount of data and documentation that each utility must develop on a case by case basis has been significantly reduced. There are also a number of additional benefits resulting from these industry efforts. The challenges and difficulties in qualifying digital equipment for safety-related applications are now more clearly understood. EPRI has published a lessons learned document (EPRI Report 1001452, Generic Qualification of Commercial Grade Digital Devices: Lessons Learned from Initial Pilots, which covers several different qualification areas, including device selection, project planning, vendor surveys and design reviews, and electromagnetic compatibility (EMC) qualification. Application of the experience and lessons learned from the EPRI pilot activities should help reduce the effort and cost required for future qualification work. Most generic qualification activities for commercial equipment have been conducted using the approach of EPRI TR-106439, Guideline on Evaluation and Acceptance

  1. 30 CFR 77.501 - Electric distribution circuits and equipment; repair.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric distribution circuits and equipment... OF UNDERGROUND COAL MINES Electrical Equipment-General § 77.501 Electric distribution circuits and equipment; repair. No electrical work shall be performed on electric distribution circuits or equipment...

  2. 41 CFR 109-38.5104 - Other motor equipment utilization standards.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Other motor equipment... AVIATION, TRANSPORTATION, AND MOTOR VEHICLES 38-MOTOR EQUIPMENT MANAGEMENT 38.51-Utilization of Motor Equipment § 109-38.5104 Other motor equipment utilization standards. No utilization standards are...

  3. Equipment inspection function; A funcao inspecao de equipamentos

    Energy Technology Data Exchange (ETDEWEB)

    Bressan, Edemir [PETROBRAS (Brazil). Refinaria Alberto Pasqualini

    1994-04-01

    Development of the safety engineering and equipment inspection policy in petroleum industry, with emphasis to the refineries equipment, are discussed. Presentation of the accidents percentages in petroleum plants under international researches, with details of involved equipment, kind of accident, plant and causes are reported. The start and actual stage of the safety inspection program in the PETROBRAS are also presented 5 refs., 3 figs.

  4. Special equipment for processing can-rupture measurements; Equipement specialise de traitement des mesures de rupture de gaines

    Energy Technology Data Exchange (ETDEWEB)

    Kaiser, J.; Phalippou, J.; Dumont, D.; Viellard, R. [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    Recent installations for detecting can-rupture in nuclear reactors use, in the measurement processing section, a digital computer, either completely or partially. The reliability of the system is limited by that of the computer, which represents a common point for the processing of data from the detector. In order to satisfy the demands imposed by safety considerations for the operation of the equipment it is necessary to consider the possibility of installing a second computer in certain cases. The use of a computer involves the presence as interface between the detection equipment and the computer itself, of sealers operating as integrators for the pulses produced by the detector. By adding a certain number of circuits to these sealers, it is possible to carry out the work now demanded of the computer, as far as the calculation is concerned. This reasoning has led us to a so-called 'decentralized' solution involving the construction of specialized equipment in the region of the prospector itself. We believe that this solution, apart from the reliability point of view, has definite economic advantages. In our solution, the common point in the processing of the data is now situated not in the zone of the production of results but further down, in the printing out of these results. Even in the case of an incident at the common point, the results are produced, exposed and compared to the alarm thresholds. In the case of a breakdown of the specialized equipment, the results from this prospector are no longer available but the others continue to operate. It seems that this solution is more reliable than that employing universal computers. By using an interchangeable drawer system (MULTIBLOC) it is possible to replace rapidly any of the specialized equipment which breaks down. The systematic use of integrated circuits (TTL) ensures an increased reliability of the equipment. (author) [French] Les installations recentes de detection de rupture de gaines

  5. Protecting electrical equipment against dust explosions

    Energy Technology Data Exchange (ETDEWEB)

    Kaiser, J

    1981-07-01

    The new ordinance on electrical equipment in hazardous areas and the new VDE 0165/6.80 have brought about significant changes in the field of electrical equipment in areas with a explosion hazard due inflammable dust. There are no constructional regulations yet in this field, and producers, planners, and users are uncertain about what measures to take. The article attempts to clear up a few points.

  6. Development of equipment for fabricating DUPIC fuel powder

    International Nuclear Information System (INIS)

    Kim, Ki Ho; Yang, M. S.; Park, J. J.; Lee, J. W.; Kim, J. H.; Cho, K. H.; Lee, D. Y.; Lee, Y. S.; Na, S. H.

    1999-06-01

    The powder fabrication processes, as the first stage of manufacturing DUPIC (Direct Use of PWR spent fuel In CANDU) fuel, consist of the slitting of spent PWR fuel rods, REOX (Oxidation and REduction of Oxide Fuels) processing to produce the powder feedstock, the milling of the produced powder, the granulation of the milled powder, and the mixing of the granulated powder with pressing lubricants. All these processes should be conducted by remote means in a hot-cell environment where the direct human access is limited to the strictest minimum due to the high radioactivity. This report describe the development of the equipment for fabricating DUPIC fuel powder. These equipment are Slitting Machine, Oxidation and Reduction (OREOX) Furnace, Mill, Roll Compactor, and Mixer. Remote design concept was applied to all the equipment for use in the M6 hot-cell of the IMEF. Mechanical design considerations and capabilities of the equipment for remote operation and maintenance are presented. First prototypes were developed and installed in the DUPIC full scale mock-up and tested using a master-slave manipulator. Redesign and reconstruction were made on each equipment based on mock-up test results. The remote technology acquired through this research was utilized in developing other equipment for DUPIC fuel fabrication, thereby improving safety and increasing productivity. This technology could also be extended to the area of remote handling equipment development for use in hazardous environments. (author). 14 refs., 9 tabs., 21 figs

  7. Development of equipment for fabricating DUPIC fuel powder

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Ki Ho; Yang, M. S.; Park, J. J.; Lee, J. W.; Kim, J. H.; Cho, K. H.; Lee, D. Y.; Lee, Y. S.; Na, S. H

    1999-06-01

    The powder fabrication processes, as the first stage of manufacturing DUPIC (Direct Use of PWR spent fuel In CANDU) fuel, consist of the slitting of spent PWR fuel rods, REOX (Oxidation and REduction of Oxide Fuels) processing to produce the powder feedstock, the milling of the produced powder, the granulation of the milled powder, and the mixing of the granulated powder with pressing lubricants. All these processes should be conducted by remote means in a hot-cell environment where the direct human access is limited to the strictest minimum due to the high radioactivity. This report describe the development of the equipment for fabricating DUPIC fuel powder. These equipment are Slitting Machine, Oxidation and Reduction (OREOX) Furnace, Mill, Roll Compactor, and Mixer. Remote design concept was applied to all the equipment for use in the M6 hot-cell of the IMEF. Mechanical design considerations and capabilities of the equipment for remote operation and maintenance are presented. First prototypes were developed and installed in the DUPIC full scale mock-up and tested using a master-slave manipulator. Redesign and reconstruction were made on each equipment based on mock-up test results. The remote technology acquired through this research was utilized in developing other equipment for DUPIC fuel fabrication, thereby improving safety and increasing productivity. This technology could also be extended to the area of remote handling equipment development for use in hazardous environments. (author). 14 refs., 9 tabs., 21 figs.

  8. Preliminary assessment of chloride concentrations, loads, and yields in selected watersheds along the Interstate 95 corridor, southeastern Connecticut, 2008-09

    Science.gov (United States)

    Brown, Craig J.; Mullaney, John R.; Morrison, Jonathan; Mondazzi, Remo

    2011-01-01

    Water-quality conditions were assessed to evaluate potential effects of road-deicer applications on stream-water quality in four watersheds along Interstate 95 (I-95) in southeastern Connecticut from November 1, 2008, through September 30, 2009. This preliminary study is part of a four-year cooperative study by the U.S. Geological Survey (USGS), the Federal Highway Administration (FHWA), and the Connecticut Department of Transportation (ConnDOT). Streamflow and water quality were studied at four watersheds?Four Mile River, Oil Mill Brook, Stony Brook, and Jordan Brook. Water-quality samples were collected and specific conductance was measured continuously at paired water-quality monitoring sites upstream and downstream from I-95. Specific conductance values were related to chloride (Cl) concentrations to assist in determining the effects of road-deicing operations on the levels of Cl in the streams. Streamflow and water-quality data were compared with weather data and with the timing, amount, and composition of deicers applied to state highways. Grab samples were collected during winter stormwater-runoff events, such as winter storms or periods of rain or warm temperatures in which melting takes place, and periodically during the spring and summer. Cl concentrations at the eight water-quality monitoring sites were well below the U.S. Environmental Protection Agency (USEPA) recommended chronic and acute Cl toxicity criteria of 230 and 860 milligrams per liter (mg/L), respectively. Specific conductance and estimated Cl concentrations in streams, particularly at sites downstream from I-95, peaked during discharge events in the winter and early spring as a result of deicers applied to roads and washed off by stormwater or meltwater. During winter storms, deicing activities, or subsequent periods of melting, specific conductance and estimated Cl concentrations peaked as high as 703 microsiemens per centimeter (?S/cm) and 160 mg/L at the downstream sites. During most of

  9. Similarity principles for equipment qualification by experience

    International Nuclear Information System (INIS)

    Kana, D.D.; Pomerening, D.J.

    1988-07-01

    A methodology is developed for seismic qualification of nuclear plant equipment by applying similarity principles to existing experience data. Experience data are available from previous qualifications by analysis or testing, or from actual earthquake events. Similarity principles are defined in terms of excitation, equipment physical characteristics, and equipment response. Physical similarity is further defined in terms of a critical transfer function for response at a location on a primary structure, whose response can be assumed directly related to ultimate fragility of the item under elevated levels of excitation. Procedures are developed for combining experience data into composite specifications for qualification of equipment that can be shown to be physically similar to the reference equipment. Other procedures are developed for extending qualifications beyond the original specifications under certain conditions. Some examples for application of the procedures and verification of them are given for certain cases that can be approximated by a two degree of freedom simple primary/secondary system. Other examples are based on use of actual test data available from previous qualifications. Relationships of the developments with other previously-published methods are discussed. The developments are intended to elaborate on the rather broad revised guidelines developed by the IEEE 344 Standards Committee for equipment qualification in new nuclear plants. However, the results also contribute to filling a gap that exists between the IEEE 344 methodology and that previously developed by the Seismic Qualification Utilities Group. The relationship of the results to safety margin methodology is also discussed. (author)

  10. Optical system for UV-laser technological equipment

    Science.gov (United States)

    Fedosov, Yuri V.; Romanova, Galina E.; Afanasev, Maxim Ya.

    2017-09-01

    Recently there has been an intensive development of intelligent industrial equipment that is highly automated and can be rapidly adjusted for certain details. This equipment can be robotics systems, automatic wrappers and markers, CNC machines and 3D printers. The work equipment considered is the system for selective curing of photopolymers using a UV-laser and UV-radiation in such equipment that leads to additional technical difficulties. In many cases for transporting the radiation from the laser to the point processed, a multi-mirror system is used: however, such systems are usually difficult to adjust. Additionally, such multi-mirror systems are usually used as a part of the equipment for laser cutting of metals using high-power IR-lasers. For the UV-lasers, using many mirrors leads to crucial radiation losses because of many reflections. Therefore, during the development of the optical system for technological equipment using UV-laser we need to solve two main problems: to transfer the radiation for the working point with minimum losses and to include the system for controlling/handling the radiation spot position. We introduce a system for working with UV-lasers with 450mW of power and a wavelength of 0.45 μm based on a fiber system. In our modelling and design, we achieve spot sizes of about 300 μm, and the designed optical and mechanical systems (prototypes) were manufactured and assembled. In this paper, we present the layout of the technological unit, the results of the theoretical modelling of some parts of the system and some experimental results.

  11. 48 CFR 908.7112 - Materials handling equipment replacement standards.

    Science.gov (United States)

    2010-10-01

    ... equipment replacement standards. 908.7112 Section 908.7112 Federal Acquisition Regulations System DEPARTMENT... Special Items 908.7112 Materials handling equipment replacement standards. Materials handling equipment shall be purchased for replacement purposes in accordance with the standards in FPMR 41 CFR 101-25.405...

  12. 45 CFR 95.705 - Equipment costs-Federal financial participation.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment costs-Federal financial participation... INSURANCE PROGRAMS) Equipment Acquired Under Public Assistance Programs § 95.705 Equipment costs—Federal financial participation. (a) General rule. In computing claims for Federal financial participation...

  13. 21 CFR 211.68 - Automatic, mechanical, and electronic equipment.

    Science.gov (United States)

    2010-04-01

    ... SERVICES (CONTINUED) DRUGS: GENERAL CURRENT GOOD MANUFACTURING PRACTICE FOR FINISHED PHARMACEUTICALS Equipment § 211.68 Automatic, mechanical, and electronic equipment. (a) Automatic, mechanical, or electronic... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Automatic, mechanical, and electronic equipment...

  14. Development of augmented reality system for servicing electromechanical equipment

    Science.gov (United States)

    Zhukovskiy, Y.; Koteleva, N.

    2018-05-01

    Electromechanical equipment is widely used. It is used in industrial enterprises, in the spheres of public services, in everyday life, etc. Maintenance servicing of electromechanical equipment is an important part of its life cycle. High-quality and timely service can extend the life of the electromechanical equipment. The creation of special systems that simplify the process of servicing electromechanical equipment is an urgent task. Such systems can shorten the time for maintenance of electrical equipment, and, therefore, reduce the cost of maintenance in general. This article presents an analysis of information on the operation of service services for maintenance and repair of electromechanical equipment, identifies the list of services, and estimates the time required to perform basic service operations. The structure of the augmented reality system is presented, the ways of interaction of the augmented reality system with the automated control systems working at the enterprise are presented.

  15. LMHC/TWRS year 2000 equipment project renovation and contingency plan

    International Nuclear Information System (INIS)

    ADAMS, M.R.

    1999-01-01

    A program has been completed to assess, renovate and document tank farm field equipment year 2000 compliance. A communication plan has also been prepared (see section 8.0). The objective of the program was to assure that no adverse effects occur in tank farm operations as a result of equipment malfunction due to the advent of year 2000. The purposes of this document are to: describe the process used to assess field equipment; document items found to be compliant; document items found to be non-compliant including options for making the equipment year 2000 functional and/or tolerant; describe location and management of field equipment year 2000 documentation; assess overall vulnerability of TWRS field equipment with regard to year 2000 problems and describe plans to communicate year 2000 equipment review results and corrective actions

  16. Alternatives Generation Analysis Long Length Contaminated Equipment Removal System Storage

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    Major pieces of Characterization sampling equipment are currently stored outdoors. This includes the Long Length Contaminated Equipment receiver trailer and transportation trailer. A decision is required to determine the preferred alternative for facilities to store and maintain this equipment. The Long Length Contaminated Equipment Removal System (LLCERS) consists of many tools, mechanisms, and controllers currently stored in various locations. Much of this equipment should be protected from the elements while being stored. Some of the LLCERS equipment should be protected with some kind of roof cover. This decision analysis is to determine the best alternative for weather protection for the large equipment requiring a cover. Additional details are included in Sections 2.0 and 5.0. Key assumptions used in this analysis are detailed in Section 3.2

  17. General Guidelines for Remote Operation and Maintenance of Pyroprocess Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, S. H.; Park, B. S.; Park, H. S.; Lee, H. J.; Choi, C. W.; Lee, J. K

    2007-12-15

    As the pyroprocess handle the high radioactive materials, a high radioactive material handling facility required high safety, radioactive shielding, strict quality control, and the remote handling equipment of high technology. This report describes the guidelines of for pyroprocess based the design guides for radioactive material handling facility and equipment from American Nuclear Society(ANS), design guidelines for remotely maintained equipment from Oak Ridge National Laboratory(ORNL), and the experience of design for ACP equipment installed at the ACPF(Advanced Conditioning Process Facility). The General guidelines in this report are as follows. The General guidelines for remote operation and maintenance of pyroprocess equipment: Pyroprocess, Remote handling equipment for pyroprocess, General guide for remote operation and maintenance, general guidelines for the design of remotely operated and maintained equipment, Estimation and analysis for remote maintenance.

  18. 49 CFR 220.38 - Communication equipment failure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Communication equipment failure. 220.38 Section 220.38 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... § 220.38 Communication equipment failure. (a) Any radio or wireless communication device found not to be...

  19. 14 CFR 121.337 - Protective breathing equipment.

    Science.gov (United States)

    2010-01-01

    ... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Instrument and Equipment Requirements § 121.337... systems other than chemical oxygen generators, there must be a means to allow the crew to readily... fully charged. (iv) For each chemical oxygen generator, the supply system equipment must meet the...

  20. Quantitative techniques for medical equipment maintenance management

    NARCIS (Netherlands)

    Ben Houria, Zeineb; Masmoudi, Malek; Al Hanbali, Ahmad; Khatrouch, Ikram; Masmoudi, Faouzi

    2016-01-01

    The maintenance department in a hospital is responsible for ensuring the safety of medical equipment and their availability while keeping the operation costs minimal. The selection of the best maintenance strategy is a key decision to reduce the equipment downtime, increase the availability, and

  1. 30 CFR 75.1400 - Hoisting equipment; general.

    Science.gov (United States)

    2010-07-01

    ... transport persons shall be equipped with brakes capable of stopping the fully loaded platform, cage, or... every two months. (d) Hoisting equipment, including automatic elevators, used to transport persons shall... required for automatically operated cages, platforms, or elevators. [48 FR 53239, Nov. 25, 1983] ...

  2. 48 CFR 945.407 - Non-Government use of plant equipment.

    Science.gov (United States)

    2010-10-01

    ... plant equipment. 945.407 Section 945.407 Federal Acquisition Regulations System DEPARTMENT OF ENERGY...-Government use of plant equipment. The type of plant equipment and dollar threshold for non-Government use of DOE plant equipment will be determined by the Head of the Contracting Activity which awarded the...

  3. 15 CFR 9.3 - Appliances and equipment included in program.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Appliances and equipment included in... VOLUNTARY LABELING PROGRAM FOR HOUSEHOLD APPLIANCES AND EQUIPMENT TO EFFECT ENERGY CONSERVATION § 9.3 Appliances and equipment included in program. The appliances and equipment included in this program are room...

  4. An overview of equipment survivability studies at Sandia National Laboratories (SNL)

    International Nuclear Information System (INIS)

    Bonzon, L.L.; Craft, Ch.M.; McCulloch, W.H.; Sebrell, W.A.

    1983-01-01

    The USNRC sponsors a number of programs at Sandia National Laboratories (SNL) specifically addressing safety-related equipment survivability. The major thrust of these programs has been the physical testing of equipment. Test results illustrate the importance of a dedicated equipment design effort giving particular attention to the safety implications of the equipment operation. Several equipment survivability tests here have revealed equipment design and test-related deficiencies

  5. LMZ experience in refurbishment of hydroturbine equipment

    Energy Technology Data Exchange (ETDEWEB)

    Sotnikov, Anatoly A. [LMZ, St. Petersburg (Russian Federation). Div. of Hydraulic Machine

    2000-07-01

    AO LMZ experience in refurbishment of hydroturbine equipment is generalized. Hydraulic turbines of many power stations having been in service of more than 30 years need rehabilitation and modernization. As a rule, the following problems are solved in the process of refurbishment works: increase of turbine efficiency and output, ensuring of reliable operation of the equipment during the next length of life, ensuring the environmental safety of the equipment, furnishing of the power station with up to date automatic control systems. The process of refurbishment used by LMZ is described. The examples of refurbishment are given. (author)

  6. Exposure parameters in fluoroscopy equipment. Quality control

    International Nuclear Information System (INIS)

    Alonso, M.; Castaneda, M.J.; Matorras, P.; Diaz-Caneja, N.; Gutierrez, I.

    1992-01-01

    Within the quality control program in Diagnostic Radiology currently being undertaken at the 'Marques de Valdecilla' University Hospital, the corresponding specification and procedure prototypes for the control of conventional radioscopy equipment have been elaborated and applied. This paper presents the values proposed in the specifications and those obtained for the following radioscopy equipment parameters: reference kerma, and its reproducibility, kerma linearity, maximum kerma at the skin, and total filtration. The results obtained indicate that the equipment studied could comply with specified requirements if a Maintenance Program were to be implemented in coordination with the Quality Control Program. (author)

  7. High-speed railway signal trackside equipment patrol inspection system

    Science.gov (United States)

    Wu, Nan

    2018-03-01

    High-speed railway signal trackside equipment patrol inspection system comprehensively applies TDI (time delay integration), high-speed and highly responsive CMOS architecture, low illumination photosensitive technique, image data compression technique, machine vision technique and so on, installed on high-speed railway inspection train, and achieves the collection, management and analysis of the images of signal trackside equipment appearance while the train is running. The system will automatically filter out the signal trackside equipment images from a large number of the background image, and identify of the equipment changes by comparing the original image data. Combining with ledger data and train location information, the system accurately locate the trackside equipment, conscientiously guiding maintenance.

  8. US8,994,532 "Data Center Equipment Location and Monitoring System"

    DEFF Research Database (Denmark)

    2014-01-01

    A data center equipment location system includes both hardware and software to provide for location, monitoring, security and identification of servers and other equipment in equipment racks. The system provides a wired alternative to the wireless RFID tag system by using electronic ID tags...... connected to each piece of equipment, each electronic ID tag connected directly by wires to a equipment rack controller on the equipment rack. The equipment rack controllers then link over a local area network to a central control computer. The central control computer provides an operator interface......, and runs a software application program that communicates with the equipment rack controllers. The software application program of the central control computer stores IDs of the equipment rack controllers and each of its connected electronic ID tags in a database. The software application program...

  9. 47 CFR 15.118 - Cable ready consumer electronics equipment.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Cable ready consumer electronics equipment. 15... Unintentional Radiators § 15.118 Cable ready consumer electronics equipment. (a) All consumer electronics TV... provisions of this section. Consumer electronics TV receiving equipment that includes features intended for...

  10. 30 CFR 75.811 - High-voltage underground equipment; grounding.

    Science.gov (United States)

    2010-07-01

    ...-voltage equipment supplying power to such equipment receiving power from resistance grounded systems shall... 30 Mineral Resources 1 2010-07-01 2010-07-01 false High-voltage underground equipment; grounding... COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Underground High-Voltage...

  11. 14 CFR 135.175 - Airborne weather radar equipment requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airborne weather radar equipment... Aircraft and Equipment § 135.175 Airborne weather radar equipment requirements. (a) No person may operate a large, transport category aircraft in passenger-carrying operations unless approved airborne weather...

  12. 46 CFR 184.702 - Pollution prevention equipment and procedures.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Pollution prevention equipment and procedures. 184.702 Section 184.702 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS... Pollution prevention equipment and procedures. A vessel must comply with the applicable design, equipment...

  13. 46 CFR 121.702 - Pollution prevention equipment and procedures.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Pollution prevention equipment and procedures. 121.702 Section 121.702 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Miscellaneous § 121.702 Pollution prevention equipment and...

  14. 21 CFR 58.63 - Maintenance and calibration of equipment.

    Science.gov (United States)

    2010-04-01

    ... GOOD LABORATORY PRACTICE FOR NONCLINICAL LABORATORY STUDIES Equipment § 58.63 Maintenance and... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Maintenance and calibration of equipment. 58.63..., maintenance, testing, calibration, and/or standardization of equipment, and shall specify, when appropriate...

  15. A compliance testing program for diagnostic X-ray equipment

    International Nuclear Information System (INIS)

    Hutchinson, D.E.; Cobb, B.J.; Jacob, C.S.

    1999-01-01

    Compliance testing is nominally that part of a quality assurance program dealing with those aspects of X-ray equipment performance that are subject to radiation control legislation. Quality assurance programs for medical X-ray equipment should be an integral part of the quality culture in health care. However while major hospitals and individual medical centers may implement such programs with some diligence, much X-ray equipment can remain unappraised unless there is a comprehensive regulatory inspection program or some form of compulsion on the equipment owner to implement a testing program. Since the late 1950s all X-ray equipment in the State of Western Australia has been inspected by authorized officers acting on behalf of the Radiological Council, the regulatory authority responsible for administration of the State's Radiation Safety Act. However, economic constraints, coupled with increasing X-ray equipment numbers and a geographically large State have significantly affected the inspection rate. Data available from inspections demonstrate that regular compliance and performance checks are essential in order to ensure proper performance and to minimize unnecessary patient and operator dose. To ensure that diagnostic X-ray equipment complies with accepted standards and performance criteria, the regulatory authority introduced a compulsory compliance testing program for all medical, dental and chiropractic diagnostic X-ray equipment effective from 1 January 1997

  16. Non-invasive system for monitoring of the manufacturing equipment

    Science.gov (United States)

    Mazăre, A. G.; Belu, N.; Ionescu, L. M.; Rachieru, N.; Misztal, A.

    2017-08-01

    The automotive industry is one of the most important industries in the world that concerns the economy and the world culture. High demand has resulted in increasing of the pressure on the production lines. In conclusion, it is required more careful in monitoring of the production equipment not only for maintenance but also for staff safety and to increase the quality of production. In this paper, we propose a solution for non-invasive monitoring of the industrial equipment operation by measuring the current consumption on energy supply lines. Thus, it is determined the utilization schedule of the equipment and operation mode. Based on these measurements, it’s built an activity report for that equipment, available to the quality management and maintenance team. The solution consists of the current measuring equipment, with self-harvesting capabilities and radio transceiver, and an embedded system which run a server. The current measuring equipment will transmit data about consumption of each energy supply network line where is placed the industrial equipment. So, we have an internal measuring radio network. The embedded system will collect data for the equipment and put in a local data base and it will provide via an intranet application. The entire system not requires any supplementary energy supply and interventions in the factory infrastructure. It is experimented in a company from the automotive industries.

  17. HVAC systems and equipment

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, S.T. (Linford Air and Refrigeration Company, Oakland, CA (US))

    1990-02-01

    The author discusses the section of the ASHRAE Standard 90.1-1989 which addresses HVAC systems and equipment. New features of HVAC systems mandatory general requirements are described. New prescriptive requirements are detailed.

  18. Dynamic monitoring equipment for earthworks and sub grades

    International Nuclear Information System (INIS)

    Alvarez de Sotomayor, R.

    2013-01-01

    This paper take into account some dynamic auscultation equipment s that currently are available in Spain for compaction quality control on earthworks and sub grades. Closed to the equipment description, a deformation modulus calculus approximation has been developed for each of them. A standards checking has been made from national and European point of view. some important research works that have been developed in our country about dynamic monitoring equipment s for quality control in earthworks has been mentioned. In addition to this, some variables are analyzed which have an influence on deformation modulus calculi and a possibility for comparing the equipment modulus calculated with a reference laboratory test has been offered. (Author) 18 refs.

  19. Research on the Emergence Modeling of Equipment System

    Directory of Open Access Journals (Sweden)

    He Xin-Hua

    2017-01-01

    Full Text Available Under the conditions of information, the network-centric system and the confrontation in the system has developed into a major combat style. But the traditional line of sexual assessment method is difficult to accurately assess the information equipment system combat capability. Therefore, this paper studies the effective evaluation method of the operational capability of the information equipment system from the perspective of emerge. Based on the simulation modeling and evaluation method, building the capability model of the weapon equipment system to evaluate the operational capability of the information weapon weaponry equipment. Through the example analysis, the validity of the simulation model and the practicability of the evaluation system is analyzed by analyzing the examples.

  20. Electronic equipment for spectrometric data processing

    International Nuclear Information System (INIS)

    Antonov, L.J.; Trenev, A.M.; Todorova, E.I.; Dimitrov, V.D.

    1978-01-01

    Electronic equipment carrying out logical operations and a full set of the arithmetic operations was developed for spectrometric data processing. The flowsheet of the computing part of the device, made on the basis of a specialized integral circuit, is given. The device includes input registers, multiplexor, matrix commutator, arithmetic unit and indication unit. The equipment is rated to carry out calculations according to comparatively complex formulae in several seconds

  1. Profit ability versus construction equipment maintenance

    OpenAIRE

    Clutts, Craig A.

    2010-01-01

    CIVINS (Civilian Institutions) Thesis document Approved for public release ; distribution is unlimited Construction equipment is a high cost of capital investment necessary for the successful existence of a private construction company and essential to the mission success of the Naval Construction Force (NCF). The highest impact cost factor other than the initial purchase investment is the expenses related to maintenance and repair. As the equipment ages, the ownership costs decrease an...

  2. Neonatal resuscitation equipment: A hidden risk for our babies?

    Science.gov (United States)

    Winckworth, Lucinda C; McLaren, Emma; Lingeswaran, Arvin; Kelsey, Michael

    2016-05-01

    Neonatal infections carry a heavy burden of morbidity and mortality. Poor practice can result in unintentional colonisation of medical equipment with potentially pathogenic organisms. This study will determine the prevalence and type of bacterial contamination on exposed neonatal resuscitation equipment in different clinical settings and explore simple measures to reduce contamination risk. A survey determined the rates of resuscitation equipment usage. All environmentally exposed items were identified on resuscitaires hospital-wide and swabbed for bacterial contamination. A new cleaning and storage policy was implemented and the prevalence of environmentally exposed equipment re-measured post-intervention. Resuscitation equipment was used in 28% of neonatal deliveries. Bacterial colony forming units were present on 44% of the 236 exposed equipment pieces swabbed. There was no significant difference in contamination rates between equipment types. Coagulase negative staphylococcus was the most prevalent species (59 pieces, 25%) followed by Escherichia coli and Enterobacter cloacae (20 pieces, 9% each). Opened items stored inside plastic remained sterile, whilst those in low-use areas had significantly less contamination than those in high-use areas (22% vs. 51%, P reducing microbial colonisation opportunities. © 2016 Paediatrics and Child Health Division (The Royal Australasian College of Physicians).

  3. 40 CFR 35.6345 - Equipment disposal options.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Equipment disposal options. 35.6345 Section 35.6345 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL... options. The following disposal options are available: (a) Use the equipment on another CERCLA project and...

  4. 30 CFR 56.4230 - Self-propelled equipment.

    Science.gov (United States)

    2010-07-01

    ....4230 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Fire Prevention and Control Firefighting Equipment § 56.4230 Self-propelled equipment. (a)(1) Whenever a fire or its effects...

  5. Process and equipment design optimising product properties and attributes

    NARCIS (Netherlands)

    Bongers, P.M.M.; Thullie, J.

    2009-01-01

    Classically, when products have been developed at the bench, process engineers will search for equipment to manufacture the product at large scale. More than often, this search is constraint to the existing equipment base, or a catalog search for standard equipment. It is then not surprising, that

  6. 29 CFR 1910.306 - Specific purpose equipment and installations.

    Science.gov (United States)

    2010-07-01

    ...) Cranes and hoists. This paragraph applies to the installation of electric equipment and wiring used in..., and similar events. This paragraph covers the installation of portable wiring and equipment, including... 29 Labor 5 2010-07-01 2010-07-01 false Specific purpose equipment and installations. 1910.306...

  7. 33 CFR 106.255 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... Shelf (OCS) Facility Security Requirements § 106.255 Security systems and equipment maintenance. (a) Security systems and equipment must be in good working order and inspected, tested, calibrated, and...

  8. 14 CFR 125.223 - Airborne weather radar equipment requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airborne weather radar equipment... Equipment Requirements § 125.223 Airborne weather radar equipment requirements. (a) No person may operate an airplane governed by this part in passenger-carrying operations unless approved airborne weather radar...

  9. 14 CFR 121.357 - Airborne weather radar equipment requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Airborne weather radar equipment... § 121.357 Airborne weather radar equipment requirements. (a) No person may operate any transport... December 31, 1964, unless approved airborne weather radar equipment has been installed in the airplane. (b...

  10. Universal machine ''Shtrek'' and the tractor-lifter with pneumatic-equipment control. [Auxiliary multipurpose materials handling equipment

    Energy Technology Data Exchange (ETDEWEB)

    Bal' bert, B M; Borumenskiy, V A; Lishenko, A P; Mitchenko, G A

    1982-01-01

    The machine ''Shtrek'' is described. It makes it possible to mechanize over 20 auxiliary operations: loading-unloading operations: extraction of old and deformed timbering; dissmantling of obstructions; erection of different types of timbering; making and restoring of drainage channels; laying and straightening of a drift and its leveling; assembly and disassembly of pipelines and mine equipment, etc. Depending on the type of operation, the machine has the corresponding suspended equipment. The elementary variant has a limited area of application at mines of the central region of the Dunbass. Currently a pneumatic variant of the machine ''Shtrek'' has been developed. The electric motor and the starter of the pumping equipment of the machine have been replaced by a pneumatic motor and pneumatically controlled valve KTM-50. In this case there was significant reduction in the weight of the pumping equipment and in its overall dimensions; the electric drive of the hydraulic distributors for controlling the mechanisms were replaced by simpler pneumatic ones; the logical circuit of the control system was constructed on the USEPPA elements. A specialized tractor-lifter designed for moving suspended loads is described for auxiliary operations in the near-face zone of the preparatory drifts. The machine also lifts and lowers the boom, rotates the boom by 270/sup 0/ and additionally lifts and lowers the weight-lifting hook.

  11. Waste Handling Equipment Development Test and Evaluation Study

    International Nuclear Information System (INIS)

    R.L. Tome

    1998-01-01

    The purpose of this study is to identify candidate Monitored Geologic Repository (MGR) surface waste handling equipment for development testing. This study will also identify strategies for performing the development tests. Development testing shall be implemented to support detail design and reduce design risks. Development testing shall be conducted to confirm design concepts, evaluate alternative design concepts, show the availability of needed technology, and provide design documentation. The candidate equipment will be selected from MGR surface waste handling equipment that is the responsibility of the Management and Operating Contractor (M and O) Surface Design Department. The equipment identified in this study is based on Viability Assessment (VA) design. The ''Monitored Geologic Repository Test and Evaluation Plan'' (MGR T and EP), Reference 5.1, was used as a basis for this study. The MGR T and EP reflects the extent of test planning and analysis that can be conducted, given the current status of the MGR requirements and latest VA design information. The MGR T and EP supports the appropriate sections in the license application (LA) in accordance with 10 CFR 60.2 1(c)(14). The MGR T and EP describes the following test activities: site characterization to confirm, by test and analysis, the suitability of the Yucca Mountain site for housing a geologic repository; development testing to investigate and document design concepts to reduce risk; qualification testing to verify equipment compliance with design requirements, specifications, and regulatory requirements; system testing to validate compliance with MGR requirements, which include the receipt, handling, retrieval, and disposal of waste; periodic performance testing to verify preclosure requirements and to demonstrate safe and reliable MGR operation; and performance confirmation modeling, testing, and analysis to verify adherence to postclosure regulatory requirements. Development test activities can be

  12. Waste Electrical and Electronic Equipment

    DEFF Research Database (Denmark)

    Bigum, Marianne Kristine Kjærgaard; Christensen, Thomas Højlund

    2011-01-01

    Waste electrical and electronic equipment (WEEE) is one of the fastest growing special waste types with an estimated growth of 3–5% per year (Cui and Forssberg, 2003). WEEE is a very heterogeneous waste type that contains many compounds that are considered to be harmful to both humans and the env......Waste electrical and electronic equipment (WEEE) is one of the fastest growing special waste types with an estimated growth of 3–5% per year (Cui and Forssberg, 2003). WEEE is a very heterogeneous waste type that contains many compounds that are considered to be harmful to both humans...

  13. SOLUTION FOR AN EQUIPMENT OF RAILWAY BRIDGE MONITORING

    Directory of Open Access Journals (Sweden)

    Liviu Mihai SIMA

    2009-11-01

    Full Text Available This paper presents a solution for the railway bridges monitoring based on the use of already existing equipments in the railway installations and some new equipments based on photo-elements, as well. This kind of equipments can function in continue and discontinuous regime, means of them tracking down if the bridge piles suffered movements by different reasons. This aspect can put in danger the safety of the circulation on that bridge.

  14. Scientific Equipment Division - Overview

    International Nuclear Information System (INIS)

    Halik, J.

    2001-01-01

    Full text: The Scientific Equipment Division consists of the Design Group and the Mechanical Workshop. The activity of the Division includes the following: - designing of devices and equipment for experiments in physics, their mechanical construction and assembly. In particular, there are vacuum chambers and installations for HV and UHV; - maintenance and upgrading of the existing installations and equipment in our Institute; - participation of our engineers and technicians in design works, equipment assembly and maintenance for experiments in foreign laboratories. The Design Group is equipped with PC-computers and AutoCAD graphic software (release 2000 and Mechanical Desktop 4.0) and a AO plotter, what allows us to make drawings and 2- and 3-dimensional mechanical documentation to the world standards. The Mechanical Workshop can offer a wide range of machining and treatment methods with satisfactory tolerances and surface quality. It offers the following possibilities: - turning - cylindrical elements of a length up to 2000 mm and a diameter up to 400 mm, and also disc-type elements of a diameter up to 600 mm and a length not exceeding 300 mm; - milling - elements of length up to 1000 mm and gear wheels of diameter up to 300 mm; - grinding - flat surfaces of dimensions up to 300 mm x 1000 mm and cylindrical elements of a diameter up to 200 mm and a length up to 800 mm; - drilling - holes of a diameter up to 50 mm; - welding - electrical and gas welding, including TIG vacuum-tight welding; - soft and hard soldering; - mechanical works including precision engineering; - plastics treatment - machining and polishing using diamond milling, modelling, lamination of various shapes and materials, including plexiglas, scintillators and light-guides; - painting - paint spraying with possibility of using furnace-fred drier of internal dimensions of 800 mm x 800 mm x 800 mm. Our workshop posses CNC milling machine which can be used for machining of work-pieces up to 500 kg

  15. Timing criteria for supplemental BWR emergency response equipment

    International Nuclear Information System (INIS)

    Bickel, John H.

    2015-01-01

    The Great Tohuku Earthquake and subsequent Tsunami represented a double failure event which destroyed offsite power connections to Fukushima-Daiichi site and then destroyed on-site electrical systems needed to run decay heat removal systems. The accident could have been mitigated had there been supplemental portable battery chargers, supplemental pumps, and in-place piping connections to provide alternate decay heat removal. In response to this event in the USA, two national response centers, one in Memphis, Tennessee, and another in Phoenix, Arizona, will begin operation. They will be able to dispatch supplemental emergency response equipment to any nuclear plant in the U.S. within 24 hours. In order to define requirements for supplemental nuclear power plant emergency response equipment maintained onsite vs. in a regional support center it is necessary to confirm: (a) the earliest time such equipment might be needed depending on the specific scenario, (b) the nominal time to move the equipment from a storage location either on-site or within the region of a nuclear power plant, and (c) the time required to connect in the supplemental equipment to use it. This paper describes an evaluation process for a BWR-4 with a Mark I Containment starting with: (a) severe accident simulation to define best estimate times available for recovery based on the specific scenario, (b) identify the key supplemental response equipment needed at specific times to accomplish recovery of key safety functions, and (c) evaluate what types of equipment should be warehoused on-site vs. in regional response centers. (authors)

  16. Equipment qualification testing - a practical approach

    International Nuclear Information System (INIS)

    Davies, G.A.; McDougall, R.I.; Poirier, M.P.

    1996-01-01

    When nuclear safety equipment is credited with a Required Safety Function it must properly perform that function to facilitate safe control and/or shutdown of the plant during a design basis accident. When such equipment is required to be environmentally (EQ) and/or seismically qualified (SQ) for safety related use in CANDU nuclear power plants, the preferred method of qualification is by type testing. The qualification testing process requires that the test specimen equipment be subjected to the aging stressors associated with the normal service conditions that it would experience during it's required qualified (or service) life. Following the aging process, the test specimen is in a condition representative of that in which it would be at the end of its service life in the plant. The test specimen is then subjected to a simulated accident during which it must satisfy performance requirements thereby demonstrating that it can perform its required safety function. The performance requirements specified for the qualification testing must be designed to ensure that satisfactory performance of the safety function is demonstrated during the qualification program. This paper provides descriptions of practical methods used in the deriving and satisfying of relevant performance requirements during the qualification testing of safety related equipment. (author)

  17. 47 CFR 2.925 - Identification of equipment.

    Science.gov (United States)

    2010-10-01

    ... common enclosure, but constructed on separate sub-units or circuit boards with independent frequency... grant of equipment authorization. (e) A software defined radio may be equipped with a means such as a... implanted within the body of a test animal or person would probably require an alternate method of...

  18. Using ADA Tasks to Simulate Operating Equipment

    Science.gov (United States)

    DeAcetis, Louis A.; Schmidt, Oron; Krishen, Kumar

    1990-01-01

    A method of simulating equipment using ADA tasks is discussed. Individual units of equipment are coded as concurrently running tasks that monitor and respond to input signals. This technique has been used in a simulation of the space-to-ground Communications and Tracking subsystem of Space Station Freedom.

  19. 48 CFR 52.207-5 - Option To Purchase Equipment.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Option To Purchase....207-5 Option To Purchase Equipment. As prescribed in 7.404, insert a clause substantially the same as the following: Option To Purchase Equipment (FEB 1995) (a) The Government may purchase the equipment...

  20. 46 CFR 197.454 - First aid and treatment equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false First aid and treatment equipment. 197.454 Section 197.454 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE OCCUPATIONAL SAFETY AND... Equipment § 197.454 First aid and treatment equipment. The diving supervisor shall ensure that medical kits...

  1. Performance testing of medical US equipment using US phantom (ATS-539)

    International Nuclear Information System (INIS)

    Kim, Do Hyung; Kwon, Deok Moon

    2014-01-01

    This study is to provide accurate information as medical imaging equipment to check for the presence of body disease US equipment. We investigated the status of medical US equipment performance in Daegu and criteria US phantom (ATS-539) for US equipment performance measurements. The results in this study, 1. US phantom measurement results: The test passed rate were 88.6% and the failed rate were 11.4%. 2. The difference between the group of mean and the pass/failed groups were statistically significant. Focal zone and 4 mm functional resolution in the two items that are not present the passing standard. 3. The difference was statistically significant number of years and used equipment and pass the failed equipment (4.13 vs 7.25 years). We investigated the performance status of US equipment used in the clinical area in Daegu. The basis for the two items are not present this proposed passing standard. Equipment performance was associated with the number of years of using US equipment. It is necessary to maintain the best performance of the equipment phantom measurements for performance testing of US equipment

  2. Performance testing of medical US equipment using US phantom (ATS-539)

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Do Hyung [Daegu Branch, Korea Association of Health Promotion, Daegu (Korea, Republic of); Kwon, Deok Moon [Dept. of Radiology, Daegu Health College, Daegu (Korea, Republic of)

    2014-12-15

    This study is to provide accurate information as medical imaging equipment to check for the presence of body disease US equipment. We investigated the status of medical US equipment performance in Daegu and criteria US phantom (ATS-539) for US equipment performance measurements. The results in this study, 1. US phantom measurement results: The test passed rate were 88.6% and the failed rate were 11.4%. 2. The difference between the group of mean and the pass/failed groups were statistically significant. Focal zone and 4 mm functional resolution in the two items that are not present the passing standard. 3. The difference was statistically significant number of years and used equipment and pass the failed equipment (4.13 vs 7.25 years). We investigated the performance status of US equipment used in the clinical area in Daegu. The basis for the two items are not present this proposed passing standard. Equipment performance was associated with the number of years of using US equipment. It is necessary to maintain the best performance of the equipment phantom measurements for performance testing of US equipment.

  3. Effectiveness of medical equipment donations to improve health systems: how much medical equipment is broken in the developing world?

    Science.gov (United States)

    Perry, Lora; Malkin, Robert

    2011-07-01

    It is often said that most of the medical equipment in the developing world is broken with estimates ranging up to 96% out of service. But there is little documented evidence to support these statements. We wanted to quantify the amount of medical equipment that was out of service in resource poor health settings and identify possible causes. Inventory reports were analyzed from 1986 to 2010, from hospitals in sixteen countries across four continents. The UN Human Development Index was used to determine which countries should be considered developing nations. Non-medical hospital equipment was excluded. This study examined 112,040 pieces of equipment. An average of 38.3% (42,925, range across countries: 0.83-47%) in developing countries was out of service. The three main causes were lack of training, health technology management, and infrastructure. We hope that the findings will help biomedical engineers with their efforts toward effective designs for the developing world and NGO's with efforts to design effective healthcare interventions.

  4. Manufacture and maintenance of laboratory equipment

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Kim, Jong Kyun; Yeum, Ki Eon; Park, Myung Ku; Hong, Soon Eon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyung Sik; Lee, Won Jae; Yoon, Ki Byung; Kim, Heung Woo; Lee, In Bae; Yeom, Jeong Hyun; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Seo, Yong Chil; Yang, Song Yeul; Lee, Young Soon; Choi, Byung Kwon; Chang, Kyung Duk [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of request working to the machine shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the machine shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. 11 tabs., 3 figs. (Author) .new.

  5. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Kim, Jong Kyun; Yeum, Ki Eon; Park, Myung Ku; Hong, Soon Eon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyung Sik; Lee, Won Jae; Yoon, Ki Byung; Kim, Heung Woo; Lee, In Bae; Yeom, Jeong Hyun; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Seo, Yong Chil; Yang, Song Yeul; Lee, Young Soon; Choi, Byung Kwon; Chang, Kyung Duk

    1993-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of request working to the machine shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the machine shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. 11 tabs., 3 figs. (Author) .new

  6. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Kim, Jong Kyun; Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Yeom, Ki Eon; Park, Myung Ku; Hong, Soon Hyeon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyeong Sik; Lee, In Bae; Yeom, Jeong Heon; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Choi, Byung Kwon; Chang, Kyeong Duk; Lee, Young Soon

    1995-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the Research and development by manufacture and maintenance of all sorts of laboratory equipment. 12 tabs., 5 figs. (Author) .new

  7. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Kim, J. K.; Whang, C. K.; Lee, J. H.; Youm, K. Y.; Hong, S. H.; Choi, H. Y.; An, C.; Park, I. W.; Kim, K. S.; Lee, W. J.; Yoon, K. B.; Kim, H. W.; Lee, I. B.; Lee, C. K.; Youm, J. H.; Oho, W. H.; Choi, B. K.; Jang, K. D.

    1996-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. (author). 9 tabs., 12 figs

  8. Physical protection equipment study. Final report

    International Nuclear Information System (INIS)

    Haberman, W.

    1977-06-01

    This report summarizes the work performed by MITRE for the U.S. Nuclear Regulatory Commission. The major products of this effort are a Catalog of Physical Protection Equipment, a Guide for Evaluation of Physical Protection Equipment, a book of Reference Materials, and a set of guidelines for use in the development of a methodology for measuring levels of security system effectiveness. A summary of recommendations resulting from this study is also presented

  9. Manufacture and maintenance of laboratory equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jong Kyun; Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Yeom, Ki Eon; Park, Myung Ku; Hong, Soon Hyeon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyeong Sik; Lee, In Bae; Yeom, Jeong Heon; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Choi, Byung Kwon; Chang, Kyeong Duk; Lee, Young Soon [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the Research and development by manufacture and maintenance of all sorts of laboratory equipment. 12 tabs., 5 figs. (Author) .new.

  10. 46 CFR 169.685 - Electric heating and cooking equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Electric heating and cooking equipment. 169.685 Section... More on Vessels of Less Than 100 Gross Tons § 169.685 Electric heating and cooking equipment. (a) Each...) All electric cooking equipment, attachments, and devices, must be of rugged construction and so...

  11. 21 CFR 211.182 - Equipment cleaning and use log.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment cleaning and use log. 211.182 Section 211.182 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES... Reports § 211.182 Equipment cleaning and use log. A written record of major equipment cleaning...

  12. Progress report of the critical equipment monitoring system

    International Nuclear Information System (INIS)

    Pantis, M.J.

    1984-01-01

    The Philadelphia Electric Company has contracted with Energy Data Systems to develop a Critical Equipment Monitoring System for its Peach Bottom Nuclear Plant. This computerized system is designed to acquire and maintain accurate and timely status information on plant equipment. It will provide auditable record of plant and equipment transactions. Positive equipment identification and location will be provided. Errors in complex logical checking will be minimized. This system should reduce operator loading and improve operator communicatin with the plant personnel. Phase I of this system was installed at Peach Bottom Nuclear Station May 1982. It provides the necessary hardware and software to do check-off lists on critical plant systems. This paper describes some of the start-up and operational problems encountered

  13. 46 CFR 91.25-25 - Hull equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Hull equipment. 91.25-25 Section 91.25-25 Shipping COAST... CERTIFICATION Inspection for Certification § 91.25-25 Hull equipment. (a) At each inspection for certification and periodic inspection, the inspectors shall conduct the following tests and inspections of hull...

  14. 46 CFR 189.25-25 - Hull equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Hull equipment. 189.25-25 Section 189.25-25 Shipping... CERTIFICATION Inspection for Certification § 189.25-25 Hull equipment. (a) At each inspection for certification and periodic inspection the inspector shall conduct the following tests and inspections of hull...

  15. Irradiation position-control equipment for the HIMAC

    Energy Technology Data Exchange (ETDEWEB)

    Higashi, Seiichi; Kuma, Shoichiro [Mitsubishi Electric Corp., Tokyo (Japan); Nomura, Kazuaki; Endo, Masahiro; Minohara, Shin-ichi

    1995-02-01

    Use of heavy-ion beams to mount a pinpoint attack on unhealthy tissue requires that the target tissue be placed in the precise location specified by the therapy planning equipment. The article reports on the detailed specifications, positioning mechanism, position verification method and the interface with the therapy planning equipment. (author).

  16. 33 CFR 154.545 - Discharge containment equipment.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Equipment Requirements § 154... chapter may be utilized in the planning requirements of subpart F and subpart H of this part. [CGD 75-124... material and equipment to contain any oil or hazardous material discharged on the water from operations at...

  17. 40 CFR 63.648 - Equipment leak standards.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Equipment leak standards. 63.648...) National Emission Standards for Hazardous Air Pollutants From Petroleum Refineries § 63.648 Equipment leak...) through (c)(10) and (e) through (i) of this section. (1) The instrument readings that define a leak for...

  18. 40 CFR 63.1331 - Equipment leak provisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Equipment leak provisions. 63.1331... Standards for Hazardous Air Pollutant Emissions: Group IV Polymers and Resins § 63.1331 Equipment leak... in pumps and agitator seals in light liquid service shall not be considered to be a leak. For...

  19. 40 CFR 63.1410 - Equipment leak provisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Equipment leak provisions. 63.1410... leak provisions. The owner or operator of each affected source shall comply with the requirements of 40 CFR part 63, subpart UU (national emission standards for equipment leaks (control level 2)) for all...

  20. Alternative Fuel and Advanced Technology Commercial Lawn Equipment

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-10-10

    The U.S. Department of Energy's Clean Cities program produced this guide to help inform the commercial mowing industry about product options and potential benefits. This guide provides information about equipment powered by propane, ethanol, compressed natural gas, biodiesel, and electricity, as well as advanced engine technology. In addition to providing an overview for organizations considering alternative fuel lawn equipment, this guide may also be helpful for organizations that want to consider using additional alternative fueled equipment.

  1. Optimal Equipment Investments for Northern Plains Grain Farms

    OpenAIRE

    Terrance Jalbert; Mercedes Jalbert; James E. Briley

    2010-01-01

    This case presents a teaching tool which requires students to identify an optimal equipment plan for a northern plains small grain farm. Students are presented with information from a farm owner regarding farm size, available labor, farming techniques used and other relevant issues. Students are required to analyze this information to identify the equipment necessary to operate the farm. Students must balance equipment costs and labor issues. They must develop a plan that remains within a pre...

  2. Gas cluster ion beam equipments for industrial applications

    International Nuclear Information System (INIS)

    Matsuo, J.; Takaoka, G.H.; Yamada, I.

    1995-01-01

    30 keV and 200 keV gas cluster ion beam equipments have been developed for industrial applications. A gas cluster source with a non-cooled nozzle was used for both the equipments. Sufficient monomer ion suppression was achieved by using an ExB filter and chromatic lenses mass filter with low extraction voltage. These equipments are suitable to be used for low-damage surface treatment of metals, insulators and semiconductors without heavy metal contamination. (orig.)

  3. 41 CFR 101-25.109-2 - Equipment pools.

    Science.gov (United States)

    2010-07-01

    ... number and location of equipment pools, consideration shall be given to economy of operation, mobility of... available for sharing or loan. Information concerning the availability of this equipment can be maintained...

  4. 21 CFR 866.4830 - Rocket immunoelectro-phoresis equipment.

    Science.gov (United States)

    2010-04-01

    ... (CONTINUED) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents... equipment for clinical use is a device used to perform a specific test on proteins by using a procedure...

  5. A Computerized Procedure linked to Virtual Equipment

    International Nuclear Information System (INIS)

    Jung, Yeon Sub; Song, Tae Young

    2011-01-01

    Digital, information, and communication technologies have change human's behavior. This is because human has limitation to memorize and process information. Human has to access other information and real time information for important decisions. Those technologies are playing important roles. Nuclear power plants cannot be exception. Many accidents in nuclear power plants result from absent or incorrect information. The information for nuclear personnel is context sensitive. They don't have enough time to verify the context sensitive information. Therefore they skip the information, as resulting in incident. Nuclear personnel are usually carrying static paper procedures during local task performance. The procedure guides them steps to follow. There is, however, no dynamic and context sensitive information in the paper. The effect of the work is evaluated once while getting permission of the work. Afterward they are not informed. The static paper is generally simplified, so that it does not show detail of equipment being manipulated. Particularly novice workers feel difficult to understand the procedure due to lack of detail. Pictures of equipment inserted in the procedure are not enough for comprehension. A computerized procedure linked with virtual equipment is one of the best solutions to increase the detail of procedure. Virtual equipment, however, has still limitation not to provide real time information, because the virtual equipment is not synchronized with real plants

  6. Development of ion/proton beam equipment for industrial uses

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Byung Ho; Lee, J. H.; Cho, Y. S.; Joo, P. K.; Kang, S. S.; Song, W. S.; Kim, H. J.; Chang, G. H.; Bang, S. W

    1999-12-01

    KAERI has possessed design and fabrication technologies of various ion sources including Duoplasmatron and DuoPiGatron developed by R and D projects of the long-term nuclear technology development program. In order to industrialize ion beam equipments utilizing these ion sources, a technology transfer project for a technology transfer project for a domestic firm has been performed. Under this project, engineers of the firm have been trained through classroom lectures of ion beam principles and OJT, an ion/proton beam equipment (DEMO equipment) has been designed, assembled and commissioned jointly with the engineers. Quality of the ion sources has been quantified, and technologies for ion beam equipment construction, functional test and application research have been developed. The DEMO equipment, which consists of an ion source, power supplies, vacuum, cooling and target systems, has been fabricated and tested to secure stability and reliability for industrial uses. Various characteristic tests including high voltage insulation, beam extraction, beam current measuring, etc. have been performed. This DEMO can be utilized for ion sources development as well as ion beam process development for various industrial products. Engineers of the firm have been trained for the industrialization of ion beam equipment and joined in beam application technology development to create industrial needs of beam equipment. (author)

  7. 30 CFR 57.22304 - Approved equipment (II-A mines).

    Science.gov (United States)

    2010-07-01

    ...) Cutting and drilling equipment used at a face or bench shall be approved by MSHA under the applicable requirements of 30 CFR parts 18 through 36. (b) While cutting or drilling is in progress, equipment not... nonapproved equipment is taken to a face or bench after blasting. (d) Mine power transformers and stationary...

  8. 30 CFR 77.1109 - Quantity and location of firefighting equipment.

    Science.gov (United States)

    2010-07-01

    ... equipment such as portable drills, sweepers, and scrapers, when operated more than 600 feet from equipment... tank. (f) Vehicles transporting explosives and blasting agents shall be equipped with fire protection...

  9. Design and construction of a air pollutant gases sampler equipment

    International Nuclear Information System (INIS)

    Gomez S, R.A.; Rodriguez, T.J.

    1996-01-01

    This thesis is about the sketch and construction of an equipment which samples contaminated gases in the air. The topic of this work, is to propose a solution for imported and national equipment. The solution consist on lower prices of imported and national equipment without loosing the accuracy and the precision of those now available. The investigation shows all process to sample gases and theirs measurement for which all the mechanical, electric and electronic equipment, and the necessary software for giving the results in a computerized way were outlined. With this work it was able to succeed in measurements with a national low price, accurate, reliable, programmable, completely automatic and easy to use. This equipment exceed in accuracy the Japanese and the american equipment

  10. Division of Scientific Equipment - Overview

    International Nuclear Information System (INIS)

    Halik, J.

    2002-01-01

    Full text: The Scientific Equipment Division consists of the Design Group and the Mechanical Workshop. The activity of the Division includes the following: * designs of devices and equipment for experiments in physics; their mechanical construction and assembly. In particular, these are vacuum chambers and installations for HV and UHV;* maintenance and upgrading of the existing installations and equipment in our Institute; * participation of our engineers and technicians in design works, equipment assembly and maintenance for experiments in foreign laboratories. The Design Group is equipped with PC-computers and AutoCAD graphic software (release 2000 and Mechanical Desktop 4.0) and an A0 plotter, which allow us to make drawings and 2- and 3-dimensional mechanical documentation to the world standards. The Mechanical Workshop offers a wide range of machining and treatment methods with satisfactory tolerances and surface quality. They include: * turning - cylindrical elements of a length up to 2000 mm and a diameter up to 400 mm, and also disc type elements of a diameter up to 600 mm and a length not exceeding 300 mm, * milling - elements of length up to 1000 mm and gear wheels of diameter up to 300 mm, * grinding - flat surfaces of dimensions up to 300 mm x 1000 mm and cylindrical elements of a diameter up to 200 mm and a length up to 800 mm, * drilling - holes of a diameter up to 50 mm, * welding - electrical and gas welding, including TIG vacuum-tight welding, * soft and hard soldering, * mechanical works including precision engineering, * plastics treatment - machining and polishing using diamond milling, modelling, lamination of various shapes and materials, including plexiglas, scintillators and light-guides, * painting - paint spraying with possibility of using furnace-fired drier of internal dimensions of 800 mm x 800 mm x 800 mm. Our workshop is equipped with the CNC milling machine which can be used for machining of work pieces up to 500 kg. The machine

  11. 47 CFR 80.1095 - Survival craft equipment.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Survival craft equipment. 80.1095 Section 80... for Ship Stations § 80.1095 Survival craft equipment. (a) At least three two-way VHF radiotelephone... they can be rapidly placed in any survival craft other than life rafts required by Regulation III/26.1...

  12. Radiographic Co-60 in component of heavy equipment casting

    International Nuclear Information System (INIS)

    Djoli Soembogo, Harun Al Rasyid R dan Namad Sianta

    2016-01-01

    The application of radiography using isotope Co-60 source has been used on component of heavy equipment such as component of heavy equipment casting. Components of heavy equipment casting made through metal casting of carbon steel. This study tried applying digital radiography are using isotope Co-60 sources and using scanning positive film media of Epson V700 for digitization results of conventional radiographic films. This radiography is using film AGFA D7 and Fuji 100 to obtain a contrast medium, medium sensitivity and image quality is good. The purpose radiographic Co-60 at a component of heavy equipment casting is detecting indications of the shape and type casting defects of component of heavy equipment casting thus fit for use. Radiographic test of Co-60 has been carried out on component of heavy equipment casting with single wall single image method and the results of radiographic films digitization using scanning positive film media of Epson V700 with observation parameters casting defects. Time exposure of Co-60 radiation was 10 and 15 minutes hours for metal castings of carbon steel for thickness 20.00-50.00 mm by using activity 30.05 Ci and the perpendicular distance to the source of the film is 820 mm. Scanner positive film results in the form of digital radiography which allow for the transfer of digital data or digital computerized data storage. Radiographic test results on component of heavy equipment casting with single wall single image method produce the parameter casting defect of component of heavy equipment casting in position of critical area is found shrinkage that should be repaired and in position of safety area is not found defect indication so casting defect of component of heavy equipment casting are not acceptable according to standards referenced. (author)

  13. Regulatory process for material handling equipment

    International Nuclear Information System (INIS)

    Rajendran, S.; Agarwal, Kailash

    2017-01-01

    Atomic Energy (Factories) Rules (AEFR) 1996, Rule 35 states, 'Thorough inspection and load testing of a Crane shall be done by a Competent Person at least once every 12 months'. To adhere to this rule, BARC Safety Council constituted 'Material Handling Equipment Committee (MHEC)' under the aegis of Conventional Fire and Safety Review Committee (CFSRC) to carry out periodical inspection and certification of Material Handling Equipment (MHE), tools and tackles used in BARC Facilities at Trombay, Tarapur and Kalpakkam

  14. Riser equipment decontamination engineering task plan

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    On October 15, 1998, two Characterization Project Operations (CPO) employees were found to have contaminated clothing. An operator had 300,000-dpm/100cm2 beta/gamma, no alpha, contamination on his coat sleeve and a Radiation Control Technician (RCT) had 10,000 dpm/100cm2 beta/gamma, no alpha, on his shirt sleeve. The CPO swing shift crew was working in TX tank farm, performing sampling activities at 241-TX-113. TX tank farm is a ''clean farm'' and does not require anti-contamination clothing for entry. The CPO personnel were dressed in normal work clothes. An operator and an RCT were performing a pre-job survey that involved removing bagging around the riser equipment. When the RCT saw that the contamination readings from smear samples of the riser equipment were greater than expected, the job was suspended. Crew members were then directed to areas of lower background radiation for personnel surveys. During personnel surveys, reportable contamination was found on the coat sleeve of the operator who had been involved in the pre-job survey and on the shirt sleeve of the RCT who had been involved in the pre-job survey. No other personnel were found to be contaminated. Because of this off normal event Characterization Engineering was given the following corrective action: Examine the process methodology used for core sampling operations to determine practicality and potential long-term advantages of reducing personnel contact with contaminated equipment. This Engineering Task Plan ensures that LMHC 1998a, Corrective Action No.7 is completely addressed by Characterization Engineering. The deliverable is an Engineering Study that evaluates decontamination of riser equipment components and considers additional engineered features to reduce potential exposure to workers operating the riser equipment. This engineering study shall also address any released design features that have failed to be implemented

  15. 33 CFR 157.170 - COW equipment: Removal.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false COW equipment: Removal. 157.170... Crude Oil Washing (COW) System on Tank Vessels Cow Operations § 157.170 COW equipment: Removal. (a) Whenever a deck mounted COW machine is removed from the tank, the master shall ensure that: (1) The supply...

  16. Enhancement of equipment services for Kozloduy NPP

    International Nuclear Information System (INIS)

    Schultz, Christophe

    2013-01-01

    Conclusion After 5 years of maintenance services, KNPP and AREVA have continuously intensified their partnership Close cooperation between KNPP, AREVA Local Office Engineers and OEM experts Involvement of sophisticated tools for diagnostics and condition monitoring Performance of engineering services and obsolescence evaluation Possibilities to perform equipment modernization of Electrical and IC equipment in future

  17. 27 CFR 6.88 - Equipment and supplies.

    Science.gov (United States)

    2010-04-01

    ..., DEPARTMENT OF THE TREASURY LIQUORS âTIED-HOUSEâ Exceptions § 6.88 Equipment and supplies. (a) General. The act by an industry member of selling equipment or supplies to a retailer does not constitute a means... a price not less than the cost to the industry member who initially purchased them, and if the price...

  18. Audio-Visual Equipment Depreciation. RDU-75-07.

    Science.gov (United States)

    Drake, Miriam A.; Baker, Martha

    A study was conducted at Purdue University to gather operational and budgetary planning data for the Libraries and Audiovisual Center. The objectives were: (1) to complete a current inventory of equipment including year of purchase, costs, and salvage value; (2) to determine useful life data for general classes of equipment; and (3) to determine…

  19. A-Cell equipment removal quality process plan

    International Nuclear Information System (INIS)

    TAKASUMI, D.S.

    1999-01-01

    This document establishes the quality assuring activities used to manage the 324 building A-Cell equipment removal activity. This activity will package, remove, transport and dispose of the equipment in A-Cell. This document is provided to ensure that appropriate and effective quality assuring activities have been incorporated into the work controlling documentation and procedures

  20. Photoelectric equipment type MFS-7 for analyzing oils

    International Nuclear Information System (INIS)

    Orlova, S.A.; Fridman, M.G.; Kholosha, T.V.; Ezhoda, G.D.; Nechitailov, V.V.

    1987-01-01

    The authors describe the equipment type MFS-7 which is intended for analyzing used oils for the wear products of motors. The difference between type MFS-7 and its predecessors lies in the application of computer techniques to control the equipment and process the output data; and in the design of the sample container, which allows for two methods of introducing the sample into the discharge. The photoelectric equipment consists of an excitation spectrum source IVS-28, having an ac arc mode and 1.v. spark, a polychoromator, a special sample holder for analyzing liquid samples, an electronic recording apparatus with digital voltmeter type ERU-18 and control computer system Spectr 2.2 based on a minicomputer with its own printer. The type MFS-7 equipment has been tested and put into mass production

  1. Integrated reliability condition monitoring and maintenance of equipment

    CERN Document Server

    Osarenren, John

    2015-01-01

    Consider a Viable and Cost-Effective Platform for the Industries of the Future (IOF) Benefit from improved safety, performance, and product deliveries to your customers. Achieve a higher rate of equipment availability, performance, product quality, and reliability. Integrated Reliability: Condition Monitoring and Maintenance of Equipment incorporates reliable engineering and mathematical modeling to help you move toward sustainable development in reliability condition monitoring and maintenance. This text introduces a cost-effective integrated reliability growth monitor, integrated reliability degradation monitor, technological inheritance coefficient sensors, and a maintenance tool that supplies real-time information for predicting and preventing potential failures of manufacturing processes and equipment. The author highlights five key elements that are essential to any improvement program: improving overall equipment and part effectiveness, quality, and reliability; improving process performance with maint...

  2. Computer imaging of EBR-II fuel handling equipment

    International Nuclear Information System (INIS)

    Peters, G.G.; Hansen, L.H.

    1995-01-01

    This paper describes a three-dimensional graphics application used to visualize the positions of remotely operated fuel handling equipment in the EBR-II reactor. A three-dimensional (3D) visualization technique is necessary to simulate direct visual observation of the transfers of fuel and experiments into and out of the reactor because the fuel handling equipment is submerged in liquid sodium and therefore is not visible to the operator. The system described in this paper uses actual signals to drive a three-dimensional computer-generated model in real-time in response to movements of equipment in the plant This paper will present details on how the 3D model of the intank equipment was created and how real-time dynamic behavior was added to each of the moving components

  3. Safety Review related to Commercial Grade Digital Equipment in Safety System

    International Nuclear Information System (INIS)

    Yu, Yeongjin; Park, Hyunshin; Yu, Yeongjin; Lee, Jaeheung

    2013-01-01

    The upgrades or replacement of I and C systems on safety system typically involve digital equipment developed in accordance with non-nuclear standards. However, the use of commercial grade digital equipment could include the vulnerability for software common-mode failure, electromagnetic interference and unanticipated problems. Although guidelines and standards for dedication methods of commercial grade digital equipment are provided, there are some difficulties to apply the methods to commercial grade digital equipment for safety system. This paper focuses on regulatory guidelines and relevant documents for commercial grade digital equipment and presents safety review experiences related to commercial grade digital equipment in safety system. This paper focuses on KINS regulatory guides and relevant documents for dedication of commercial grade digital equipment and presents safety review experiences related to commercial grade digital equipment in safety system. Dedication including critical characteristics is required to use the commercial grade digital equipment on safety system in accordance with KEPIC ENB 6370 and EPRI TR-106439. The dedication process should be controlled in a configuration management process. Appropriate methods, criteria and evaluation result should be provided to verify acceptability of the commercial digital equipment used for safety function

  4. 49 CFR 390.17 - Additional equipment and accessories.

    Science.gov (United States)

    2010-10-01

    ... equipment and accessories, not inconsistent with or prohibited by this subchapter, provided such equipment... are used. [53 FR 18052, May 19, 1988, as amended at 60 FR 38744, July 28, 1995. Redesignated at 65 FR...

  5. Optimization on replacement period of plant equipment

    International Nuclear Information System (INIS)

    Kasai, Masao; Asano, Hiromi

    2002-01-01

    Optimization of the replacement period of plant equipment is one of the main items to rationalize the activities on plant maintenance. There are several models to replace the equipment and the formulations for optimizing the replacement period are different among these models. In this study, we calculated the optimum replacement periods for some equipment parts based on the replacement models and found that the optimum solutions are not so largely differ from the replacement models as far as the replacement period is not so large. So we will be able to use the most usable model especially in the early phase of rationalization on plant maintenance, since there are large uncertainties in data for optimization. (author)

  6. Orphee reactor experimental equipment

    International Nuclear Information System (INIS)

    1987-01-01

    Experimental equipment around the ORPHEE reactor is presented. The neutron source; and the spectrometers and sample environment (inelastic and quasi-elastic scattering, elastic scattering, spread scattering, small angle scattering) are described. An experiment proposal and reports guide is supplied [fr

  7. The market for nuclear equipment - engineering and fabrication

    International Nuclear Information System (INIS)

    Tait, D.R.

    1977-01-01

    The role of electronic equipment in a CANDU power station is explained. Costs of installations and outages are outlined. The nuclear market for electronic equipment utilizes many components common to non-nuclear applications. (E.C.B.)

  8. Impacto das Competências de Equipes sobre o Desempenho

    Directory of Open Access Journals (Sweden)

    Katia Puente-Palacios

    2018-03-01

    Full Text Available Resumo As competências para o trabalho têm sido tradicionalmente compreendidas como atributos de indivíduos; entretanto, estudos mais recentes tornam pertinente defender a sua ocorrência como atributos coletivos. O objetivo deste estudo foi demonstrar que competências individuais podem transformar-se em competências coletivas e, nesse nível, predizer o desempenho da equipe. A testagem empírica foi realizada em 51 aeródromos brasileiros, totalizando 106 equipes (entre 3 e 32 integrantes. Instrumentos respondidos pelos membros focaram nas competências enquanto os respondidos pelos lideres indagaram sobre o desempenho das equipes. Os resultados revelaram que as competências coletivas explicam aproximadamente 20% do desempenho das equipes. Disso depreende-se que as competências podem se manifestar como atributos coletivos que predizem resultados de equipes de trabalho.

  9. The history and development of NASA survival equipment.

    Science.gov (United States)

    Radnofsky, M. I.

    1972-01-01

    A research and development program on survival equipment was begun in early 1960 with the Mercury Program. The Mercury survival kit is discussed together with Gemini survival equipment, and Apollo I survival equipment. A study program is conducted to assess potential survival problems that may be associated with future space flights landing in polar waters. Survival kit requirements for applications on the Skylab program are also considered. Other investigations are concerned with the design of a global survival kit in connection with Space Shuttle missions.

  10. Research on the Reliability Testing of Electrical Automation Control Equipment

    OpenAIRE

    Yongjie Luo

    2014-01-01

    According to the author’s many years’ work experience, this paper first discusses the concepts of electrical automation control equipment reliability testing, and then analyzes the test method of electrical automation control equipment reliability testing, finally, on this basis, this article discusses how to determine the reliability test method of electrical automation control equipment. Results of this study will provide a useful reference for electrical automation control equipment reliab...

  11. Radiological equipment 'Planmeca' used in dentistry

    International Nuclear Information System (INIS)

    Tuciac, Carolina

    2011-01-01

    Equipment 'Planmeca Pro Max 3D' for volumetric imaging with cone beam examine the patients under computerized tomography considering the rate 0.2-1.0 mm, digital orthopantomography, 3D cephalometry. 3D tomography image facilitates an accurate view of oral structures. It was adopted quickly, and became the basic equipment for all applications in dentistry. The Cone Beam Volumetric Tomography (CBVT), Planmeca Pro Max 3D model give the opportunity to obtain great radiological information very important for the dentist decision. (author)

  12. Development of maintenance equipment for nuclear material fabrication equipment in a highly active hot cell

    International Nuclear Information System (INIS)

    Park, J. J.; Yang, M. S.; Kim, K. H. and others

    2000-09-01

    This report presents the development of a maintenance system for a highly contaminated nuclear material handling equipment at a hot-cell. This maintenance system has mainly three subsystems - a gamma-radiation measurement module for detecting a gamma-radiation level and identifying its distribution in-situ, a dry-type decontamination device for cleaning up contaminated particles, and a maintenance chamber for isolating contaminated equipment. The mechanical design considerations, controller, capabilities and remote operation and manipulation of the maintenance system are described. Such subsystems developed were installed and tested in the IMEF (Irradiated Material Examination Facility) M6 hot-cell after mock-up tests and performed their specific tasks successfully

  13. Development of maintenance equipment for nuclear material fabrication equipment in a highly active hot cell

    Energy Technology Data Exchange (ETDEWEB)

    Park, J. J.; Yang, M. S.; Kim, K. H. and others

    2000-09-01

    This report presents the development of a maintenance system for a highly contaminated nuclear material handling equipment at a hot-cell. This maintenance system has mainly three subsystems - a gamma-radiation measurement module for detecting a gamma-radiation level and identifying its distribution in-situ, a dry-type decontamination device for cleaning up contaminated particles, and a maintenance chamber for isolating contaminated equipment. The mechanical design considerations, controller, capabilities and remote operation and manipulation of the maintenance system are described. Such subsystems developed were installed and tested in the IMEF (Irradiated Material Examination Facility) M6 hot-cell after mock-up tests and performed their specific tasks successfully.

  14. Large-component handling equipment and its use

    International Nuclear Information System (INIS)

    Krieg, S.A.; Swannack, D.L.

    1983-01-01

    The Fast Flux Test Facility (FFTF) reactor systems have special requirements for component replacements during maintenance servicing. Replacement operations must address handling of equipment within shielded metal containers while maintaining an inert atmosphere to prevent reaction of sodium with air. Plant identification of a failed component results in selecting and assembling the maintenance cask and equipment transport system for transfer from the storage facility to the Reactor Containment Building (RCB). This includes a proper diameter and length cask, inert atmosphere control consoles, component lift fixture and support structure for interface with the facility area surrounding the component. This equipment is staged in modular groups in the Reactor Service Building for transfer through the equipment airlock to the containment interior. The failed component is generally prepared for replacement by installation of the special lifting fixture attachment. Assembly of the cask support structure is performed over the component position on the containment building operating floor. The cask and shroud from the reactor interface are inerted after all manual service connections and handling attachments are completed. The component is lifted from the reactor and into the cask interior through a floor valve which is then closed to isolate the component reactor port. The cask with sodium wetted component is transferred to a service/repair location, either within containment or outside, to the Maintenance Facility cleaning and repair area. The complete equipment and handling operations for replacement of a large reactor component are described

  15. Inventory of Tank Farm equipment stored or abandoned aboveground

    International Nuclear Information System (INIS)

    Hines, S.C.; Lakes, M.E.

    1994-01-01

    This document provides an inventory of Tank Farm equipment stored or abandoned aboveground and potentially subject to regulation. This inventory was conducted in part to ensure that Westinghouse Hanford Company (WHC) does not violate dangerous waste laws concerning storage of potentially contaminated equipment/debris that has been in contact with dangerous waste. The report identifies areas inventoried and provides photographs of equipment

  16. Classification of methods and equipment recovery secondary waters

    Directory of Open Access Journals (Sweden)

    G. V. Kalashnikov

    2017-01-01

    Full Text Available The issues of purification of secondary waters of industrial production have an important place and are relevant in the environmental activities of all food and chemical industries. For cleaning the transporter-washing water of beet-sugar production the key role is played by the equipment of treatment plants. A wide variety of wastewater treatment equipment is classified according to various methods. Typical structures used are sedimentation tanks, hydrocyclones, separators, centrifuges. In turn, they have a different degree of purification, productivity through the incoming suspension and purified secondary water. This is equipment is divided into designs, depending on the range of particles to be removed. A general classification of methods for cleaning the transporter-washing water, as well as the corresponding equipment, is made. Based on the analysis of processes and instrumentation, the main methods of wastewater treatment are identified: mechanical, physicochemical, combined, biological and disinfection. To increase the degree of purification and reduce technical and economic costs, a combined method is widely used. The main task of the site for cleaning the transporter-washing waters of sugar beet production is to provide the enterprise with water in the required quantity and quality, with economical use of water resources, taking into account the absence of pollution of surface and groundwater by industrial wastewater. In the sugar industry is currently new types of washing equipment of foreign production are widely used, which require high quality and a large amount of purified transporter-washing water for normal operation. The proposed classification makes it possible to carry out a comparative technical and economic analysis when choosing the methods and equipment for recuperation of secondary waters. The main equipment secondary water recovery used at the beet-sugar plant is considered. The most common beet processing plant is a

  17. 30 CFR 70.305 - Respiratory equipment; gas, dusts, fumes, or mists.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Respiratory equipment; gas, dusts, fumes, or... LABOR COAL MINE SAFETY AND HEALTH MANDATORY HEALTH STANDARDS-UNDERGROUND COAL MINES Respiratory Equipment § 70.305 Respiratory equipment; gas, dusts, fumes, or mists. Respiratory equipment approved by...

  18. Shaking table testing of electrical equipment in Argentina

    International Nuclear Information System (INIS)

    Carmona, J.S.; Zabala, F.; Santalucia, J.; Sisterna, C.; Magrini, M.; Oldecop, L.

    1995-01-01

    This paper describes the testing facility, the methodology applied and the results obtained in the seismic qualification tests of different types of electric equipment. These tests were carried out on a shaking table that was developed and built at the Earthquake Research Institute of the National University of San Juan, Argentine. The equipment tested consist of 500 KV and 132 KV current transformers, a 500 KV voltage transformer, a 145 KV disconnecter and a relay cabinet. The acceleration response of the tested equipment was measured at several locations distributed along its height, and strains were measured at critical points by strain gauges cemented on the base of the porcelain insulator. All the information was recorded with a data acquisition system at a sampling rate of 200 times per second in each channel. The facility developed at this Institute is the largest one in operation in Argentina at present and the equipment tested is the highest, heaviest and more slender one which has been seismically qualified on a shaking table in this country. These tests have been a valuable experience in the field of structural dynamic testing applied to equipment of hydroelectric and nuclear power plants. (author)

  19. Safety requirements and feedback of commonly used material handling equipment

    International Nuclear Information System (INIS)

    Pathak, M.K.

    2009-01-01

    Different types of cranes, hoists, chain pulley blocks are the most commonly used material handling equipment in industry along with attachments like chains, wire rope slings, d-shackles, etc. These equipment are used at work for transferring loads from one place to another and attachments are used for anchoring, fixing or supporting the load. Selection of the correct equipment, identification of the equipment planning of material handling operation, examination/testing of the equipment, education and training of the persons engaged in operation of the material handling equipment can reduce the risks to safety of people in workplace. Different safety systems like boom angle indicator, overload tripping device, limit switches, etc. should be available in the cranes for their safe use. Safety requirement for safe operation of material handling equipment with emphasis on different cranes and attachments particularly wire rope slings and chain slings have been brought out in this paper. An attempt has also been made to bring out common nature of deficiencies observed during regulatory inspection carried out by AERB. (author)

  20. Equipment reliability improvement process; implementation in Almaraz NPP and Trillo NPP

    International Nuclear Information System (INIS)

    Risquez Bailon, Aranzazu; Gutierrez Fernandez, Eduardo

    2010-01-01

    The Equipment Reliability Improvement Process (INPO AP-913) is a non-regulatory process developed by the US Nuclear Industry for improving Plants Availability. This Process integrates and coordinates a broad range of equipment reliability activities into one process, performed by the Plant in a non-centralized way. The integration and coordination of these activities will allow plant personnel to evaluate the trends of important station equipment, develop and implement long-term equipment health plans, monitor equipment performance and condition, and make adjustments to preventive maintenance tasks and frequencies based on equipment operating experience, if necessary, arbitrating operational and design improvements, to reach a Failure-free Operation. This paper describes the methodology of Equipment Reliability Improvement Process, being focused on main aspects of the implementation process, relating to the scope and establishment of an Equipment Reliability Monitoring Plan, which should include and complement the existing mechanisms and organizations in the Plant to monitor the condition and performance of the equipments, with the common aim of achieving an operation free of failures. The paper will describe the tools that Iberdrola Ingenieria has developed to support the implementation and monitoring of the Equipment Reliability Improvement Process, as well as the results and lessons learned from its implementation in Almaraz NPP and Trillo NPP. (authors)

  1. Equipment gift to Monaco

    International Nuclear Information System (INIS)

    1970-01-01

    Research work at the Agency's Laboratory of Marine Radioactivity in Monaco, including that concerned with pollution of the sea, has been made more effective by its latest acquisition of equipment. This is a spectrophotometer donated by the Federal Republic of Germany. (author)

  2. Equipment and special tool design for remote maintenance

    International Nuclear Information System (INIS)

    Northey, L.M.; Thomson, J.D.

    1985-01-01

    Maintenance tasks performed in locations with hostile environments and/or limited space accesses often require equipment that is operated remotely. This paper discusses considerations that should be addressed in the design of remote maintenance equipment. Some of the topics include proper material selection, interface identifications, operational feedback devices and cost limitations. These considerations add ''human engineering'' to the equipment design to assure protection of the tool and the operating personnel. Examples of remote maintenance and inspection systems that were developed by the Westinghouse Hanford Company and that utilize many of these design considerations are included

  3. 30 CFR 77.500 - Electric power circuits and electric equipment; deenergization.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric power circuits and electric equipment... OF UNDERGROUND COAL MINES Electrical Equipment-General § 77.500 Electric power circuits and electric equipment; deenergization. Power circuits and electric equipment shall be deenergized before work is done on...

  4. JCE Online: Equipment Buyers Guide

    Science.gov (United States)

    Holmes, Jon L.

    1999-01-01

    The Equipment Buyers Guide was edited by Jo Rita Jordan. The new Equipment Buyers Guide, bound into the back of this issue, is also a new resource of JCE Internet. This resource provides an online source for the information contained in the printed guide. Placing this information online allows us to regularly update it and to provide live links to the suppliers' WWW sites. The organization of the online version parallels that of the print version. There is an alphabetical list of suppliers and a categorical listing. Links to these lists are provided on every page in the left-hand navigation bar. To quickly find information about a particular supplier, you click Supplier List, click the letter that begins the supplier's name, and scroll through the list to find the supplier. To find which suppliers provide a particular type of instrument or equipment, use the Categories link; click the category of the equipment you are looking for and then click the link to a supplier. You will then be taken to an alphabetical supplier listing page where you can scroll until you find the particular supplier of the item for which you are looking. Once you have found a supplier, the online Equipment Buyers Guide gives you the traditional contact information. But in addition, you also get one-click access to the WWW sites of the suppliers that have them. Depending on the site, you should be able to find information about the items that you seek and may even be able to order the items online! We think that you will find the online version of the Equipment Buyers Guide useful. To make it more useful, please send your suggestions, any errors or omissions you find, and any additional categories to the editor at jjordan@world.std.com The online Equipment Buyers Guide can be found at JCE Online at http://JChemEd.chem.wisc.edu/JCEWWW/Resources/EBG/ JCE Online in '99 JCE Online is your online source of "all things JCE". In order to provide you with an even more useful online resource, JCE

  5. Equipment aging: an overview of status and research needs

    International Nuclear Information System (INIS)

    Carfagno, S.P.

    1982-01-01

    The problem of equipment aging in nuclear power generating stations is viewed from the standpoint of the qualification of safety-related equipment. A brief summary of developments related to equipment aging and qualification (in industry, the regulatory arena, and in the research area) is presented to focus on the current status of the problem. Several research topics are suggested for consideration as components of any general plan of research on plant aging. Among these is a topic concerned with an effort to establish the relative merit of different approaches to account for the functional degradation of equipment in terms of their cost and their contribution to assurance of public safety and a topic to investigate ways to improve the monitoring of functional degradation of equipment in service. Some factors to be considered in choosing among research topics and in establishing funding levels are mentioned

  6. The application of GIS equipment in nuclear power plant

    International Nuclear Information System (INIS)

    Ji Lin; Huang Pengbo; Chang Xin'ai

    2012-01-01

    In this paper, the advantage and disadvantage of gas insulated switchgear (GIS) in environmental adaptability, operation safety and economic benefit are analyzed. Issues concerning the manufacture, transportation, on-site installation, operation, maintenance and extension of GIS equipment are discussed. Comparing those characteristics with air insulated switchgear (AIS), GIS is characterized by better aseismic ability, less occupied area and installation process, lower fault rate, longer maintenance period, easier for extension and higher economic benefit, SF6 gas insures the operation safety and reliability of GIS equipment, modular transport and re-assembling improves the installation flexibility. Therefore, GIS equipment may be the first choice for the primary equipment of nuclear power plant. (authors)

  7. Development of Equipment for Use in Sport

    Science.gov (United States)

    James, David

    2012-01-01

    No one has ever been able to create a running shoe that can make one run faster, but in other sports the design of equipment has the potential to offer considerable enhancement. Judgement has to be made as to whether such advantage becomes unfair. This article indicates many possible sports in which the equipment plays an important part in the…

  8. 40 CFR 273.4 - Applicability-Mercury-containing equipment.

    Science.gov (United States)

    2010-07-01

    ... equipment. 273.4 Section 273.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR UNIVERSAL WASTE MANAGEMENT General § 273.4 Applicability—Mercury...-containing components have been removed. (c) Generation of waste mercury-containing equipment. (1) Used...

  9. Procurement of novel microanalysis equipment for construction materials.

    Science.gov (United States)

    2012-02-01

    The equipment procured (i.e. an Orbis micro X-ray Fluorescence (MXRF) and an APSEX personal Scanning Electron Microscope (PSEM)) is part of the next generation of micro analytical equipment. These tools have the ability to make large volumes of...

  10. Computer imaging of EBR-II handling equipment

    International Nuclear Information System (INIS)

    Hansen, L.H.; Peters, G.G.

    1994-10-01

    This paper describes a three-dimensional graphics application used to visualize the positions of remotely operated fuel handling equipment in the EBR-II reactor. The system described in this paper uses actual signals to move a three-dimensional graphics model in real-time in response to movements of equipment in the plant. A three-dimensional (3D) visualization technique is necessary to simulate direct visual observation of the transfers of fuel and experiments into and out of the reactor because the fuel handling equipment is submerged in liquid sodium and therefore is not visible to the operator. This paper will present details on how the 3D model was created and how real-time dynamic behavior was added to each of the moving components

  11. Development of an equipment diagnostic system that evaluates sensor drift

    International Nuclear Information System (INIS)

    Kanada, Masaki; Arita, Setsuo; Tada, Nobuo; Yokota, Katsuo

    2011-01-01

    The importance of condition monitoring technology for equipment has increased with the introduction of condition-based maintenance in nuclear power plants. We are developing a diagnostic system using process signals for plant equipment, such as pumps and motors. It is important to enable the diagnostic system to distinguish sensor drift and equipment failure. We have developed a sensor drift diagnostic method that combines some highly correlative sensor signals by using the MT (Mahalanobis-Taguchi) method. Furthermore, we have developed an equipment failure diagnostic method that measures the Mahalanobis distance from the normal state of equipment by the MT method. These methods can respectively detect sensor drift and equipment failure, but there are the following problems. In the sensor drift diagnosis, there is a possibility of misjudging the sensor drift when the equipment failure occurs and the process signal changes because the behavior of the process signal is the same as that of the sensor drift. Oppositely, in the equipment failure diagnosis, there is a possibility of misjudging the equipment failure when the sensor drift occurs because the sensor drift influences the change of process signal. To solve these problems, we propose a diagnostic method combining the sensor drift diagnosis and the equipment failure diagnosis by the MT method. Firstly, the sensor drift values are estimated by the sensor drift diagnosis, and the sensor drift is removed from the process signal. It is necessary to judge the validity of the estimated sensor drift values before removing the sensor drift from the process signal. We developed a method for judging the validity of the estimated sensor drift values by using the drift distribution based on the sensor calibration data. And then, the equipment failure is diagnosed by using the process signals after removal of the sensor drifts. To verify the developed diagnostic system, several sets of simulation data based on abnormal cases

  12. Lack of security of networked medical equipment in radiology.

    Science.gov (United States)

    Moses, Vinu; Korah, Ipeson

    2015-02-01

    OBJECTIVE. There are few articles in the literature describing the security and safety aspects of networked medical equipment in radiology departments. Most radiologists are unaware of the security issues. We review the security of the networked medical equipment of a typical radiology department. MATERIALS AND METHODS. All networked medical equipment in a radiology department was scanned for vulnerabilities with a port scanner and a network vulnerability scanner, and the vulnerabilities were classified using the Common Vulnerability Scoring System. A network sniffer was used to capture and analyze traffic on the radiology network for exposure of confidential patient data. We reviewed the use of antivirus software and firewalls on the networked medical equipment. USB ports and CD and DVD drives in the networked medical equipment were tested to see whether they allowed unauthorized access. Implementation of the virtual private network (VPN) that vendors use to access the radiology network was reviewed. RESULTS. Most of the networked medical equipment in our radiology department used vulnerable software with open ports and services. Of the 144 items scanned, 64 (44%) had at least one critical vulnerability, and 119 (83%) had at least one high-risk vulnerability. Most equipment did not encrypt traffic and allowed capture of confidential patient data. Of the 144 items scanned, two (1%) used antivirus software and three (2%) had a firewall enabled. The USB ports were not secure on 49 of the 58 (84%) items with USB ports, and the CD or DVD drive was not secure on 17 of the 31 (55%) items with a CD or DVD drive. One of three vendors had an insecure implementation of VPN access. CONCLUSION. Radiologists and the medical industry need to urgently review and rectify the security issues in existing networked medical equipment. We hope that the results of our study and this article also raise awareness among radiologists about the security issues of networked medical equipment.

  13. 77 FR 75400 - Labeling Requirements for Commercial and Industrial Equipment

    Science.gov (United States)

    2012-12-20

    ...-intensity discharge lamps, distribution transformers, and small electric motors as covered equipment. (42 U... following: Electric motors and pumps; commercial HVAC and water heating equipment (small, large, and very... prescribed for certain types of covered equipment. Specific requirements are established for electric motors...

  14. 48 CFR 445.407 - Non-Government use of plant equipment.

    Science.gov (United States)

    2010-10-01

    ... plant equipment. 445.407 Section 445.407 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Contractor Use and Rental of Government Property 445.407 Non-Government use of plant equipment. Requests for non-Government use of plant equipment as...

  15. Complex modal properties of coupled moderately light equipment-structure systems

    International Nuclear Information System (INIS)

    Gupta, A.K.; Jaw Jingwen

    1986-01-01

    A new improved perturbation method for evaluating complex modal properties of coupled equipment-structure systems is presented. The method is applicable even when the equipment is not very light, and when the secondary system (equipment) introduces static constraint on the primary system (structure). The new method is applied to nine 8DOF coupled multiply connected equipment-structure systems. It is shown that the new method yields results which are in excellent agreement with the corresponding exact results. (orig.)

  16. Qualification of electrical equipment. A United States nuclear system supplier perspective

    International Nuclear Information System (INIS)

    Jordan, W.G.

    1978-01-01

    At Westinghouse Pressurized Water Reactor Systems Division (PWR-SD) qualification. of safety related electrical equipment can be segregated into three distinct generations: (1) the initial seismic and environmental qualification programs for electrical equipment (1969-1972); (2) the supplemental sismic and environmental qualification programs (1975-1977); and (3) the seismic and environmental qualification programs to meet IEEE-323-1974, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations''(1975). The latter two programs (in a licensing framework), as they are most current, with emphasis on electrical equipment (e.g. transmitters, rack mounted equipment) as opposed to electro-mechanical equipment (valve operators, pump motors) are reviewed. (author)

  17. Radiological equipment analyzed by specific developed phantoms and software

    International Nuclear Information System (INIS)

    Soto, M.; Campayo, J. M.; Mayo, P.; Verdu, G.; Rodenas, F.

    2010-10-01

    The use of radiographic phantoms specifically designed to evaluate the operation of the radiographic equipment lets the study of the image quality obtained by this equipment in an objective way. In digital radiographic equipment, the analysis of the image quality can be computerized because the acquisition of the image is possible in different technologies that are, computerized radiography or phosphor plate and direct radiography or detector. In case of film-screen equipment s this analysis could be applied digitalising the image in a professional scanner. In this work we have shown an application to assess automatically the constancy quality image in the image chain of the radiographic equipment s. This application is integrated by designed radiographic phantoms which are adapted to conventional, dental equipment s and specific developed software for the automatic evaluation of the phantom image quality. The software is based on digital image processing techniques that let the automatic detection of the different phantom tests by edge detector, morphological operators, threshold histogram techniques... etc. The utility developed is enough sensitive to the radiographic equipment of operating conditions of voltage (kV) and charge (m As). It is a friendly user programme connected with a data base of the hospital or clinic where it has been used. After the phantom image processing the user can obtain an inform with a resume of the imaging system state with accepting and constancy results. (Author)

  18. Radiological equipment analyzed by specific developed phantoms and software

    Energy Technology Data Exchange (ETDEWEB)

    Soto, M.; Campayo, J. M. [Logistica y Acondicionamientos Industriales SAU, Sorolla Center, Local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain); Mayo, P. [TITANIA Servicios Tecnologicos SL, Sorolla Center, Local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain); Verdu, G.; Rodenas, F., E-mail: m.soto@lainsa.co [ISIRYIM Universidad Politecnica de Valencia, Camino de Vera s/n, Valencia (Spain)

    2010-10-15

    The use of radiographic phantoms specifically designed to evaluate the operation of the radiographic equipment lets the study of the image quality obtained by this equipment in an objective way. In digital radiographic equipment, the analysis of the image quality can be computerized because the acquisition of the image is possible in different technologies that are, computerized radiography or phosphor plate and direct radiography or detector. In case of film-screen equipment s this analysis could be applied digitalising the image in a professional scanner. In this work we have shown an application to assess automatically the constancy quality image in the image chain of the radiographic equipment s. This application is integrated by designed radiographic phantoms which are adapted to conventional, dental equipment s and specific developed software for the automatic evaluation of the phantom image quality. The software is based on digital image processing techniques that let the automatic detection of the different phantom tests by edge detector, morphological operators, threshold histogram techniques... etc. The utility developed is enough sensitive to the radiographic equipment of operating conditions of voltage (kV) and charge (m As). It is a friendly user programme connected with a data base of the hospital or clinic where it has been used. After the phantom image processing the user can obtain an inform with a resume of the imaging system state with accepting and constancy results. (Author)

  19. Management of radiodiagnostic equipment: Implementation of self-maintenance project of the conventional x-ray equipment of Hospital Universitario Clementino Fraga Filho - HUCFF-UFRJ

    International Nuclear Information System (INIS)

    Couto, N.F. do; Azevedo, A.C.P.; Koch, H.A.

    2001-01-01

    The project aims the implantation of a management program, for the maintenance of the conventional X-ray equipment at HUCFF. It has been implemented through the training of the electronic technicians who work at the Hospital. Essential courses were organized such as: Basics of Radioprotection, Radiographs Techniques, and Maintenance of equipment of X-Rays. Equipment: a library with the schemes of the equipment is being assembled in collaboration with UNICAMP. In order to manage the process, a software was created using the tools of the total quality for control of the maintenance. Preliminary tests: the equipment and their working conditions were evaluated, as well as the level of the employees' satisfaction with their use. The creation of a new routine for maintenance seeks to assist the demands of the new legislation in Brazil 5, and also reduce the costs to improve the quality of the images in the Radiodiagnostic Service. (author)

  20. 40 CFR 82.36 - Approved refrigerant handling equipment.

    Science.gov (United States)

    2010-07-01

    ... equipment. 82.36 Section 82.36 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PROTECTION OF STRATOSPHERIC OZONE Servicing of Motor Vehicle Air Conditioners § 82.36...-12, Extraction and Recycle Equipment for Mobile Automotive Air-Conditioning Systems, and Standard of...

  1. Application of Equipment Monitoring Technology in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kang, H. T.; Lee, J. K.; Lee, K. D.; Jo, S. H.

    2012-01-01

    The major goal of nuclear power industries during the past 10 years is to increase reliability and utility capacity factor. As the capacitor factor, however, crept upward. it became harder to attain next percentage of improvement. Therefore other innovative technologies are required. By the technologies applied to the fossil power plants, equipment health monitoring was performed on equipment to maintain it in operable condition and contributed on improving their reliability a lot. But the equipment monitoring may be limited to the observation of current system states in nuclear power plant. Monitoring of current system states is being augmented with prediction of future operating states and predictive diagnosis of future failure states. Such predictive diagnosis is motivated by the need for nuclear power plants to optimize equipment performance and reduce costs and unscheduled downtime. This paper reviews the application of techniques that focus on improving reliability in nuclear power plant by monitoring and predicting equipment health and suggests how possible to support on-line monitoring

  2. Transport of bundles and equipment which contain radioactive material

    International Nuclear Information System (INIS)

    1987-01-01

    This norm settles down: 1) The requirements that should be completed in relation to safety precautions and protection against ionizing radiations during the transport radioactive material and/or equipment containing it, in order to avoid risks to the collective and the environment. 2) The basic information on procedures that will be completed in the event of happening accidents during the transport or the transit storage of radioactive material and/or equipment that contain it. 3) The measures of security and physical protection during the transport of radioactive material and/or equipment containing it. This norm is applied: 1) To all the ways of transport (by air, by ground and by ship, fluvial and marine) of radioactive material and/or equipment that contain it. 2) To all natural or legal, public or private person, devoted to install, produce, trade, market, import or export radioactive materials and/or equipment containing it, and that needs to transport them as main or secondary activity [es

  3. Seismic qualification method of equipment for nuclear power plant

    International Nuclear Information System (INIS)

    Kim, J.S.; Choi, T.H.; Sulaimana, R.A.

    1995-01-01

    Safety related equipment installed in Korean Nuclear Power Plants are required to perform a safety function during and after a seismic event. To accomplish this safety function, they must be seismically qualified in accordance with the intent and requirements of the USNRC Reg. Guide 1.100 Rev. 02 and IEEE Std. 344-1987. This paper defines and summarizes acceptable criteria and procedures, based on the Korean experience, for seismic qualification of purchased equipment to be installed in a nuclear power plant. As such the paper is intended to be a concise reference by equipment designers, architectural engineering company and plant owners in uniform implementation of commitments to nuclear regulatory agencies such as the USNRC or Korea Institute of Nuclear Safety (KINS) relating to adequacy of seismic Category 1 equipment. Thus, the paper provides the methodologies which can be used for qualifying equipment for safely related service in Nuclear Power Plants in a cost effective manner

  4. Perry Nuclear Power Plant Area/Equipment Temperature Monitoring Program

    International Nuclear Information System (INIS)

    McGuire, L.L.

    1991-01-01

    The Perry Nuclear Power Plant Area/Equipment Temperature Monitoring Program serves two purposes. The first is to track temperature trends during normal plant operation in areas where suspected deviations from established environmental profiles exist. This includes the use of Resistance Temperature Detectors, Recorders, and Temperature Dots for evaluation of equipment qualified life for comparison with tested parameters and the established Environmental Design Profile. It also may be used to determine the location and duration of steam leaks for effect on equipment qualified life. The second purpose of this program is to aid HVAC design engineers in determining the source of heat outside anticipated design parameters. Resistance Temperature Detectors, Recorders, and Temperature Dots are also used for this application but the results may include design changes to eliminate the excess heat or provide qualified equipment (cable) to withstand the elevated temperature, splitting of environmental zones to capture accurate temperature parameters, or continued environmental monitoring for evaluation of equipment located in hot spots

  5. Evaluation of artillery equipment maintenance support capability based on grey clustering

    Science.gov (United States)

    Zhai, Mei-jie; Gao, Peng

    2017-12-01

    This paper, the theory and method of evaluating the capability of equipment maintenance support in China and abroad are studied, from the point of view of the combat task of artillery troops and the strategic attachment in the future military struggle. This paper establishes the framework of the evaluation Index system of the equipment maintenance support capability of the artillery units, and applies the grey clustering method to the evaluation of the equipment maintenance support capability of the artillery units, and finally evaluates the equipment maintenance and support capability of the artillery brigade as an example, and analyzes the evaluation results. This paper finds out the outstanding problems existing in the maintenance and support of military equipment, and puts forward some constructive suggestions, in order to improve the status of military equipment maintenance and support and improve the level of future equipment maintenance.

  6. The reduction of noise from hydraulic equipments; La reduction du bruit provenant des equipements hydrauliques

    Energy Technology Data Exchange (ETDEWEB)

    Gential, R.

    1996-09-01

    Noise pollution from hydraulic equipments (bath filling, toilets taps, waste waters flow, vibrations, knocks in water pipes, dilatation clattering in heating pipes, hissing of heater taps etc..) are one of the principal causes of nuisance inside residential buildings. Solutions exist and consist in the replacement of old cocks and fittings, the use of soundproof clamps for pipes and noise absorbing supports for baths etc.. This paper summarizes the available modern equipments with a low-noise warranty (cocks and fittings, noise dampers, anti-backflow valves, pressure reducers) and the practical solutions for the modification of existing installations (increase of pipe diameters, reduction of pipe lengths, use of flexible fittings, hydraulic counterbalancing of water flows in heaters etc..). (J.S.)

  7. FUNDAMENTALS OF RELIABILITY OF ELECTRIC POWER SYSTEM AND EQUIPMENT

    OpenAIRE

    Engr. Anumaka; Michael Chukwukadibia

    2011-01-01

    Today, the electric power system consists of complex interconnected network which are prone to different problems that militates against the reliability of the power system. Inadequate reliability in the power system causes problems such as high failure rate of power system installations and consumer equipment, transient and intransient faults, symmetrical faults etc. This paper provides an extensive review of the powers system and equipment reliability and related failure patterns in equipment.

  8. Discrete-continuous analysis of optimal equipment replacement

    OpenAIRE

    YATSENKO, Yuri; HRITONENKO, Natali

    2008-01-01

    In Operations Research, the equipment replacement process is usually modeled in discrete time. The optimal replacement strategies are found from discrete (or integer) programming problems, well known for their analytic and computational complexity. An alternative approach is represented by continuous-time vintage capital models that explicitly involve the equipment lifetime and are described by nonlinear integral equations. Then the optimal replacement is determined via the opt...

  9. Ion beam stabilization in ion implantation equipment

    International Nuclear Information System (INIS)

    Pina, L.

    1973-01-01

    The results are presented of experimental efforts aimed at ion beam current stabilization in an equipment for ion implantation in solids. The related problems of power supplies are discussed. Measured characteristics of laboratory equipment served the determination of the parameters to be required of the supplies as well as the design and the construction of the supplies. The respective wiring diagram is presented. (J.K.)

  10. 40 CFR 86.206-11 - Equipment required; overview.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Equipment required; overview. 86.206-11 Section 86.206-11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... New Medium-Duty Passenger Vehicles; Cold Temperature Test Procedures § 86.206-11 Equipment required...

  11. 40 CFR 86.206-94 - Equipment required; overview.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Equipment required; overview. 86.206-94 Section 86.206-94 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... New Medium-Duty Passenger Vehicles; Cold Temperature Test Procedures § 86.206-94 Equipment required...

  12. Equipment support for the implementation of safeguards

    International Nuclear Information System (INIS)

    Arlt, R.; Bosler, G.; Goldfarb, M.; Schanfein, M.; Whichello, J.

    2001-01-01

    Full text: The provision of effective, reliable, and user-friendly equipment needed for the implementation of safeguards is one of the main objectives of the Division of Technical Services (SOTS) in the Department of Safeguards. As an outcome of a review by an independent external consultant firm, the instrumentation sections of the SGTS were reorganized in January 2001 into two new sections, the Section for NDA Systems and Seals (TNS) and Section for Installed Systems (TIE). Each section has 'cradle-to-grave' responsibilities for development, implementation, maintenance, and decommissioning of safeguards instruments and measurement systems. Unattended assay, monitoring and surveillance instruments are the responsibility of TIE while attended nondestructive assay (NDA) instruments and seals are handled by TNS. The principal goals of both sections are to define equipment requirements based on Departmental needs, to coordinate Support Programme tasks concerning development and implementation activities, to provide system engineering of commercial components, manage laboratory and to do field testing and prove system suitability for defined safeguards applications. In addition both sections coordinate equipment and supply needs for the Department, including acquisition, preparation, servicing, installation, commissioning, troubleshooting, maintenance and repair, ensuring their availability when needed. As required, TIE and TNS provide specialized field support to the Operations Divisions. Each section is working to standardize equipment as much as possible and reduce the number of instruments performing the same function. This reduces both inspector and technician training, required parts inventories, and overall life-cycle costs. Development based on User Needs from the Operations Divisions follows a strict quality control program that includes a thorough qualification testing procedure with the last phase being field-testing under actual facility conditions. A

  13. 30 CFR 18.51 - Electrical protection of circuits and equipment.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electrical protection of circuits and equipment... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Construction and Design Requirements § 18.51 Electrical protection of circuits and equipment. (a) An automatic...

  14. 30 CFR 18.21 - Machines equipped with powered dust collectors.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Machines equipped with powered dust collectors... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Construction and Design Requirements § 18.21 Machines equipped with powered dust collectors. Powered dust...

  15. 30 CFR 75.503-1 - Statement listing all electric face equipment.

    Science.gov (United States)

    2010-07-01

    ... all electric face equipment being used at each mine as of the time of filing, all such equipment being... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Statement listing all electric face equipment...-General § 75.503-1 Statement listing all electric face equipment. Each operator of a coal mine shall...

  16. EAS Equipment Authorization Grantee Registrations

    Data.gov (United States)

    Federal Communications Commission — EAS (Equipment Authorization System). Radio Frequency (RF) devices are required to be properly authorized under 47 CFR Part 2 prior to being marketed or imported...

  17. Seismic resistance of WWER equipment (systematization and generalization)

    International Nuclear Information System (INIS)

    Kaznovski, S.; Chechenov, H.

    1999-01-01

    Within the scope of the contract with IAEA, calculational and experimental investigations of equipment seismic resistance were carried out. Systematic seismic inspection was conducted for 21 WWER type reactors in Armenia, Bulgaria, Russia, Slovakia and Ukraine. On the base of generalisation of extensive real data accumulated during inspection of equipment seismic resistance at different WWER-type NPPs the classification of seismic instability reasons and working out of generalised recommendations were carried out. It gives the possibility to specialists in many cases to expose the seismic insufficiency of equipment and to choose the suitable measures without laborious experimental investigations, tests, and calculations

  18. Method for keeping equipment and pipeline of nuclear power plant

    International Nuclear Information System (INIS)

    Okubo, Osamu.

    1990-01-01

    The present invention intends to suppress corrosion of equipments and pipelines in condensate, feedwater and feedwater heater drain systems during operation of a nuclear power plant. That is, condensate, feedwater and drain remained in equipments and pipelines just after the stopping of operation are passed through pipelines comprising only conduits, or they are introduced to a condensator passing through the pipelines and condensate pipes. Further, the remaining droplets on the inner surfaces are evaporated by the remaining heat of the equipments and the pipelines themselves. Then, the equipments and pipelines are isolated from other regions and kept. In view of the above, since condensate, feedwater and water feeder drains are introduced directly to the condensator passing through the conduits in which other equipments such as tanks and pumps are not present and are isolated and kept, corrosion of the equipments and the pipelines is suppressed and radioactive contamination is suppressed from prevailing by way of cruds. (I.S.)

  19. The development of special equipment amplitude detection instrument based on DSP

    International Nuclear Information System (INIS)

    Dai Sidan; Chen Ligang; Lan Peng; Wang Huiting; Zhang Liangxu; Wang Lin

    2014-01-01

    Development and industrial application of special equipment plays an important role in the development of nuclear energy process. Equipment development process need to do a lot of tests, amplitude detection is a key test,it can analysis the device's electromechanical and physical properties. In the industrial application, the amplitude detection can effectively reflect the operational status of the current equipment, the equipment can also be a certain degree of fault diagnosis, identify problems in a timely manner. The main development target in this article is amplitude detection of special equipment. This article describes the development of special equipment amplitude detection instrument. The instrument uses a digital signal processor (DSP) as the central processing unit, and uses the DSP + CPLD + high-speed AD technology to build a complete set of high-precision signal acquisition and analysis processing systems, rechargeable lithium battery as the powered device. It can do a online monitoring of special equipment amplitude, speed parameters by acquiring and analysing the tachometer signal in the special equipment, and locally display through the LCD screen. (authors)

  20. Instrumentation qualification. Seismic qualification of C-E instrumentation equipment. Part One

    International Nuclear Information System (INIS)

    1977-05-01

    A summary of the C-E seismic qualification program utilized to demonstrate the seismic design adequacy of the instrumentation and control equipment used in C-E supplied Nuclear Steam Supply Systems (NSSS) is presented. The report is divided into two parts. Part One includes the equipment seismic requirements and a description of the qualification methods. Part Two lists the specific equipment by nuclear station in which it is used and the equipment test results are summarized in a standard data sheet format to facilitate review. The seismic requirements are based on individual contract commitments with C-E customers and the NRC Standard Review Plan, Section 3.10 ''Seismic Qualification of Category I Instrumentation and Electrical Equipment.'' Equipment is qualified for use in a seismic environment where damage potential to the equipment is less than or equal to that simulated seismic environment to which it has been qualified. The anticipated Safe Shutdown Earthquake (SSE) environment at the inservice location of equipment should be confirmed by each applicant as not exceeding that to which it is qualified

  1. Tube for irradiation equipment

    International Nuclear Information System (INIS)

    Goehrich, K.; Vogt, H.

    1979-01-01

    This patent describes a tube for irradiation equipment for limiting an emergent beam, with a baseplate, possessing a central aperture, intended for attaching to the equipment, as well as four carrier plates, each of which possesses a limiting edge and a sliding edge located at right angles thereto. The carrier plates are located parallel to the baseplate, the limiting edge of each carrier plate resting against the sliding edge of the adjacent carrier plate and each of the two mutually opposite pairs of carrier plates being displaceable, parallel to the direction of its sliding edges and symmetrically to the center of the transmission aperture, for the purpose of continuously varying the transmission aperture defined by the limiting edges, during which displacement each of the displaced carrier plates carries with it the carrier plate, resting against the limiting edge of the former plate, parallel to the direction of the limiting edge of the latter plate. 8 claims

  2. Re-qualification of switchgear equipment following field modification

    International Nuclear Information System (INIS)

    Tulk, J.D.; El Bestawi, M.A.

    1984-01-01

    A set of 4.16 kV switchgear was seismically qualified by shaker table test for use in a nuclear power plant. Later, the equipment was modified by the addition of two extra switches and enclosures. This paper describes the methods used to extend the qualification achieved in the original proof test to the new configuration. Qualification of the modified switchgear depended on demonstrating that the intensity of the shaking that would be experienced by equipment mounted in the extended enclosure during a design basis earthquake (DBE) would be no stronger than the shaking that occurred during the original qualification testing. This was accomplished by a combination of analysis and experiment. Natural frequencies and mode-shapes of the original and extended enclosure structures were determined through in-situ modal tests on the equipment. Mathematical models based on the experimental results were then used for dynamic analyses which generated two sets of in-equipment response spectra: one set representing the original qualification test; and one set representing the response of the modified equipment to a hypothetical DBE. Qualification was confirmed by demonstrating that the test-based response spectra for the original configuration exceeded the response spectra developed for the extended structure subjected to DBE level excitation

  3. 30 CFR 77.1707 - First aid equipment; location; minimum requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false First aid equipment; location; minimum... OF UNDERGROUND COAL MINES Miscellaneous § 77.1707 First aid equipment; location; minimum requirements. (a) Each operator of a surface coal mine shall maintain a supply of the first aid equipment set forth...

  4. 49 CFR 176.93 - Vehicles having refrigerating or heating equipment.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Vehicles having refrigerating or heating equipment... Transported on Board Ferry Vessels § 176.93 Vehicles having refrigerating or heating equipment. (a) A transport vehicle fitted with refrigerating or heating equipment using a flammable liquid or Division 2.1...

  5. 46 CFR Sec. 12 - Disposition of removed equipment and scrap.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Disposition of removed equipment and scrap. Sec. 12... CONTRACT-NSA-LUMPSUMREP Sec. 12 Disposition of removed equipment and scrap. (a) Article 8 of the NSA-LUMPSUMREP Contract provides that any ship equipment, fuel, lube oil, supplies, stores, furniture, fixtures...

  6. 40 CFR 82.158 - Standards for recycling and recovery equipment.

    Science.gov (United States)

    2010-07-01

    ... importers of recycling and recovery equipment intended for use during the maintenance, service, or repair of... recycling or recovery equipment at manufacturing facilities to ensure that each equipment model line that... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Standards for recycling and recovery...

  7. 49 CFR 604.8 - Leasing FTA funded equipment and drivers.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Leasing FTA funded equipment and drivers. 604.8... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION CHARTER SERVICE Exceptions § 604.8 Leasing FTA funded equipment and drivers. (a) A recipient may lease its FTA-funded equipment and drivers to registered charter providers...

  8. Mongolia - Vocational Education - Equipment Upgrades

    Data.gov (United States)

    Millennium Challenge Corporation — Evaluation design The impact evaluation sought to identify the causal impact of exposure to equipment upgrades on subsequent outcomes. Insofar as we were not able to...

  9. Regulation EM-GT-7. Quality control of the radiography equipment

    International Nuclear Information System (INIS)

    2015-01-01

    The purpose of this document is to provide practical guidance of technical procedures for carrying out quality control in X-ray equipment. This guide is applicable to general purpose radiography equipment, although some of the procedures may be applied to other types of diagnostic imaging equipment. The tests described require the appointed instrumentation and some of these can be implemented in the radiodiagnostic given the simplicity of them and others require special equipment and can be performed by external specialized groups to these units.

  10. Potentially damaging failure modes of high- and medium-voltage electrical equipment

    International Nuclear Information System (INIS)

    Hoy, H.C.

    1984-01-01

    The high- and medium-voltage electrical equipment failures of both nuclear and nonnuclear electric utilities have been reviewed for possible disruptive failure modes that would be of special concern in a nuclear power plant. The resulting emphasis was on the electrical faults of transformers, switchgear (circuit breakers), lightning (surge) arrestors, high-voltage cabling and buswork, control boards, and other electrical equipment that, through failure, can be the initiating event that may expand the original fault to nearby or associated equipment. Many failures of such equipment were found and documented, although the failure rate of electrical equipment in utilities is historically quite low. Nuclear plants record too few failures to be statistically valid, but failures that have been recorded show that good design usually restricts the failure to a single piece of equipment. Conclusions and recommendations pertaining to the design, maintenance, and operation of the affected electrical equipment are presented

  11. Anesthetic equipment, facilities and services available for pediatric ...

    African Journals Online (AJOL)

    Background: Facilities and equipment are known to contribute to improved patient care and outcome. Hospitals for sub‑specialized pediatric anesthetic service are routinely available worldwide. In Nigeria, such hospitals now exist. It is therefore relevant to study the facilities and equipment available for pediatric anesthetic ...

  12. 47 CFR 69.306 - Central office equipment (COE).

    Science.gov (United States)

    2010-10-01

    ... that any Central office equipment attributable to local transport shall be assigned to the Transport... Information and Transport access elements based on the remaining combined investment in COE Category 1... equipment for purposes of the Modification of Final Judgment in United States v. Western Electric Co. shall...

  13. [Hydrotherapy equipment].

    Science.gov (United States)

    Tsibikov, V B; Ragozin, S I; Mikheeva, L V

    1985-01-01

    A flow-chart is developed demonstrating the relation between medical and prophylactic institutions within the organizational structure of the rehabilitation system and main types of rehabilitation procedures. In order to ascertain the priority in equipping rehabilitation services with adequate hardware the special priority criterion is introduced. The highest priority is assigned to balneotherapeutic and fangotherapeutic services. Based on the operation-by-operation analysis of clinical processes related to service and performance of balneologic procedures the preliminary set of clinical devices designed for baths, basins and showers in hospitals and rehabilitation departments is defined in a generalized form.

  14. An analysis of USMC heavy construction equipment (HCE) requirements

    OpenAIRE

    Blaxton, Allen C.; Fay, Michael J.; Hansen, Cheryl M.; Zuchristian, Christopher M.

    2003-01-01

    MBA Professional Report Approved for public release; distribution is unlimited. According to I and L, HQMC, the Marine Corps needs to re-evaluate current operational requirements for engineer construction equipment. Acquisition and force allocation levels for equipment have remained essentially at constant 1970's, Cold War levels. Because acquisition and allocation levels haven't changed at the same rate as personnel, there is a perception that much of the existing equipment is unnecess...

  15. Seismic fragility levels of nuclear power plant equipment

    International Nuclear Information System (INIS)

    Bandyopadhyay, K.K.; Hofmayer, C.H.

    1987-01-01

    Seismic fragility levels of safety-related electrical and mechanical equipment used in nuclear power plants are discussed. The fragility level is defined as the vibration level corresponding to initiation of equipment malfunctions. The test response spectrum is used as a measure of this vibration level. The fragility phenomenon of an equipment is represented by a number of response spectra corresponding to various failure modes. Analysis methods are described for determination of the fragility level by use of existing test data. Useful conversion factors are tabulated to transform test response spectra from one damping value to another. Results are presented for switch-gears and motor control centers. The capacity levels of these equipment assemblies are observed to be limited by malfunctioning of contactors, motor starters, relays and/or switches. The applicability of the fragility levels, determined in terms of test response spectra, to Seismic Margin Studies and Probabilistic Risk Assessments is discussed and specific recommendations are provided

  16. The point of view of thermal equipment users; Le point de vue des gestionnaires d`equipements thermiques

    Energy Technology Data Exchange (ETDEWEB)

    Barroyer, P. [Compagnie Generale de Chauffe, 59 - Saint Andre Lez Lille (France)

    1997-12-31

    The influence of new pollution regulations in France on the operation of thermal equipment for central heating systems or industrial heat process systems, is examined. The main French regulations concerning air pollution control and energy rational consumption are reviewed, and their effects on the design, equipment, operation and costs of heat plants are discussed: impacts of the decree on upgrading and disposal of fossil fuel ashes, the decree on special protection zone (large cities), the clean air law, the compulsory declaration for classified combustion plants and limit air pollution emission levels

  17. Data Network Equipment Energy Use and Savings Potential in Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Lanzisera, Steven; Nordman, Bruce; Brown, Richard E.

    2010-06-09

    Network connectivity has become nearly ubiquitous, and the energy use of the equipment required for this connectivity is growing. Network equipment consists of devices that primarily switch and route Internet Protocol (IP) packets from a source to a destination, and this category specifically excludes edge devices like PCs, servers and other sources and sinks of IP traffic. This paper presents the results of a study of network equipment energy use and includes case studies of networks in a campus, a medium commercial building, and a typical home. The total energy use of network equipment is the product of the stock of equipment in use, the power of each device, and their usage patterns. This information was gathered from market research reports, broadband market penetration studies, field metering, and interviews with network administrators and service providers. We estimate that network equipment in the USA used 18 TWh, or about 1percent of building electricity, in 2008 and that consumption is expected to grow at roughly 6percent per year to 23 TWh in 2012; world usage in 2008 was 51 TWh. This study shows that office building network switches and residential equipment are the two largest categories of energy use consuming 40percent and 30percent of the total respectively. We estimate potential energy savings for different scenarios using forecasts of equipment stock and energy use, and savings estimates range from 20percent to 50percent based on full market penetration of efficient technologies.

  18. Project management in nuclear equipment manufacture

    International Nuclear Information System (INIS)

    Liu Jiancheng

    2005-01-01

    The completion of the management organization shall be firstly considered in project management for a nuclear power plant. The organization of nuclear equipment quality assurance program and project management consists of 5 departments such as the nuclear power container department, the manufacture department and the quality assurance department. The general manager takes the overall responsibility for the quality of the nuclear press usr bearing equipment, and the vice general manager takes responsibility for the quality, technology and schedule related with the manufacture of the equipment, and organizes the organization department for the audit. The director of the quality assurance department takes the responsibility for the establishment and completion of the quality assurance program, with enough rights authorized by the general manager, including the right not bounded by the cost and schedule, and confirms the implementation of the program by related departments and personnel. The manufacture schedule shall be prepared to ensure the implementation feasibility, process continuity and flexibility. The schedule shall be followed and monitored for the whole process, to check and feedback the implementation. (authors)

  19. TDRSS S-shuttle unique receiver equipment

    Science.gov (United States)

    Weinberg, A.; Schwartz, J. J.; Spearing, R.

    1985-01-01

    Beginning with STS-9, the Tracking and Date Relay Satellite system (TDRSS) will start providing S- and Ku-band communications and tracking support to the Space Shuttle and its payloads. The most significant element of this support takes place at the TDRSS White Sands Ground Terminal, which processes the Shuttle return link S- and Ku-band signals. While Ku-band hardware available to other TDRSS users is also applied to Ku-Shuttle, stringent S-Shuttle link margins have precluded the application of the standard TDRSS S-band processing equipment to S-Shuttle. It was therfore found necessary to develop a unique S-Shuttle Receiver that embodies state-of-the-art digital technology and processing techniques. This receiver, developed by Motorola, Inc., enhances link margins by 1.5 dB relative to the standard S-band equipment and its bit error rate performance is within a few tenths of a dB of theory. An overview description of the Space Shuttle Receiver Equipment (SSRE) is presented which includes the presentation of block diagrams and salient design features. Selected, measured performance results are also presented.

  20. Radioactive wastes assay technique and equipment

    International Nuclear Information System (INIS)

    Lee, K. M.; Hong, D. S; Kim, T. K.; Bae, S. M.; Shon, J. S.; Hong, K. P.

    2004-12-01

    The waste inventory records such as the activities and radio- nuclides contained in the waste packages are to be submitted with the radioactive wastes packages for the final disposal. The nearly around 10,000 drums of waste stocked in KAERI now should be assayed for the preparation of the waste inventory records too. For the successive execution of the waste assay, the investigation into the present waste assay techniques and equipment are to be taken first. Also the installation of the waste assay equipment through the comprehensive design, manufacturing and procurement should be proceeded timely. As the characteristics of the KAERI-stocked wastes are very different from that of the nuclear power plant and those have no regular waste streams, the application of the in-direct waste assay method using the scaling factors are not effective for the KAERI-generated wastes. Considering for the versal conveniency including the accuracy over the wide range of waste forms and the combination of assay time and sensitivity, the TGS(Tomographic Gamma Scanner) is appropriate as for the KAERI -generated radioactive waste assay equipment