WorldWideScience

Sample records for decadal planning team

  1. Planning for high performance project teams

    International Nuclear Information System (INIS)

    Reed, W.; Keeney, J.; Westney, R.

    1997-01-01

    Both industry-wide research and corporate benchmarking studies confirm the significant savings in cost and time that result from early planning of a project. Amoco's Team Planning Workshop combines long-term strategic project planning and short-term tactical planning with team building to provide the basis for high performing project teams, better project planning, and effective implementation of the Amoco Common Process for managing projects

  2. The Planning Task for Teams (PLATT): An environment for research on planning and decision making in teams

    NARCIS (Netherlands)

    Kamphuis, W.; Houttuin, K.

    2007-01-01

    In this report, we introduce a newly developed task environment for experimental team research: the Planning Task for Teams (PLATT). PLATT is a scenario based, computerized, complex planning task for three-person teams. PLATT has been designed to be able to do experimental laboratory research on

  3. Building a team through a strategic planning process.

    Science.gov (United States)

    Albert, Debra; Priganc, Dave

    2014-01-01

    Strategic planning is a process often left to senior hospital leadership, with limited input from unit-level, bedside patient care providers. This frequent approach to strategic planning misses the opportunity to engage a wide range of employees, build a shared sense of commitment, produce a collaborative team environment, and to generate greater acceptance of the plan. The Patient Care Services division at the University of Chicago Medicine used a strategic planning process that incorporated 360-degree input from both within the Patient Care Services division and outside of the division. The result is a strategic vision and plan that, shaped by broad-based input from both internal and external constituencies, is strengthened by the team that emerged from the process. Through the process of identifying a common understanding of the group's future direction, a shared purpose was created that transcended traditional professional boundaries and shaped a cohesive team focused on effective and efficient patient care. Now, with a focused strategic plan and a team centered on a shared purpose, the team is beginning to effectively deliver on the plan.

  4. Strategic Team AI Path Plans: Probabilistic Pathfinding

    Directory of Open Access Journals (Sweden)

    Tng C. H. John

    2008-01-01

    Full Text Available This paper proposes a novel method to generate strategic team AI pathfinding plans for computer games and simulations using probabilistic pathfinding. This method is inspired by genetic algorithms (Russell and Norvig, 2002, in that, a fitness function is used to test the quality of the path plans. The method generates high-quality path plans by eliminating the low-quality ones. The path plans are generated by probabilistic pathfinding, and the elimination is done by a fitness test of the path plans. This path plan generation method has the ability to generate variation or different high-quality paths, which is desired for games to increase replay values. This work is an extension of our earlier work on team AI: probabilistic pathfinding (John et al., 2006. We explore ways to combine probabilistic pathfinding and genetic algorithm to create a new method to generate strategic team AI pathfinding plans.

  5. Final Action Plan to Tiger Team

    International Nuclear Information System (INIS)

    1992-01-01

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit

  6. Distinguishing between taskwork and teamwork planning in teams: relations with coordination and interpersonal processes.

    Science.gov (United States)

    Fisher, David M

    2014-05-01

    Planning in teams represents a critical process that lays the groundwork for effective team functioning. The current investigation examined whether emergent team planning can be meaningfully characterized in terms of a distinction between planning that focuses on taskwork and planning that focuses on teamwork. In Study 1, items written to reflect commonly identified indicators of team planning were subjected to an exploratory factor analysis. In Study 2, slightly modified items were provided to a separate sample, and a confirmatory factor analysis was conducted. In Study 3, the relationships between the different forms of planning and other team processes (i.e., coordination, interpersonal processes) were examined in order to determine whether there are unique relationships for task-focused and team-focused planning. Results from the first 2 studies provided support for a 2-factor structure of team planning, whereas Study 3 found independent relationships for taskwork and teamwork planning with subsequent team processes. Both forms of planning also exhibited indirect relationships with team performance via the mediating role of subsequent team processes. (c) 2014 APA, all rights reserved.

  7. IAEA Sets Up Team to Drive Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: The International Atomic Energy Agency is setting up a Nuclear Safety Action Team to oversee prompt implementation of the IAEA Action Plan on Nuclear Safety and ensure proper coordination among all stakeholders. The 12-point Action Plan, drawn up in the wake of the Fukushima Daiichi accident, was approved by the Agency's Board of Governors on 13 September and endorsed by all 151 Member States at its General Conference last week. The team will work within the Agency's Department of Nuclear Safety and Security, headed by Deputy Director General Denis Flory, and will coordinate closely with the Director General's Office for Policy. ''The Action Plan requires immediate follow-up,'' Director General Yukiya Amano said. ''This compact, dedicated team will assist Deputy Director General Flory in implementing the measures agreed in the Action Plan.'' Gustavo Caruso, Head of the Regulatory Activities Section in the IAEA's Division of Installation Safety, has been designated as the team's Special Coordinator for the implementation of the Action Plan. The IAEA has already started implementing its responsibilities under the Action Plan, including development of an IAEA methodology for stress tests for nuclear power plants. The methodology will be ready in October. (IAEA)

  8. International Thermonuclear Experimental Reactor U.S. Home Team Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Sowder, W. K.

    1998-10-01

    The International Thermonuclear Experimental Reactor (ITER) project is unique in that the work is divided among an international Joint Central Team and four Home Teams, with the overall responsibility for the quality of activities performed during the project residing with the ITER Director. The ultimate responsibility for the adequacy of work performed on tasks assigned to the U.S. Home Team resides with the U.S. Home Team Leader and the U.S. Department of Energy Office of Fusion Energy (DOE-OFE). This document constitutes the quality assurance plan for the ITER U.S. Home Team. This plan describes the controls exercised by U.S. Home Team management and the Performing Institutions to ensure the quality of tasks performed and the data developed for the Engineering Design Activities assigned to the U.S. Home Team and, in particular, the Research and Development Large Projects (7). This plan addresses the DOE quality assurance requirements of 10 CFR 830.120, "Quality Assurance." The plan also describes U.S. Home Team quality commitments to the ITER Quality Assurance Program. The ITER Quality Assurance Program is based on the principles described in the International Atomic Energy Agency Standard No. 50-C-QA, "Quality Assurance for Safety in Nuclear Power Plants and Other Nuclear Facilities." Each commitment is supported with preferred implementation methodology that will be used in evaluating the task quality plans to be submitted by the Performing Institutions. The implementing provisions of the program are based on guidance provided in American National Standards Institute/American Society of Mechanical Engineers NQA-1 1994, "Quality Assurance." The individual Performing Institutions will implement the appropriate quality program provisions through their own established quality plans that have been reviewed and found to comply with U.S. Home Team quality assurance plan commitments to the ITER Quality Assurance Program. The extent of quality program provisions

  9. Improved ant Colony Optimization for Virtual Teams Building in Collaborative Process Planning

    Directory of Open Access Journals (Sweden)

    Yingying Su

    2014-02-01

    Full Text Available Virtual teams have been adopted by organizations to gain competitive advantages in this global economy. Virtual teams are a ubiquitous part of getting work done in almost every organization. For the purpose of building virtual teams in collaborative process planning, the method based on improved ant colony algorithm (IMACO was proposed. The concept of virtual team was illustrated and the necessity of building virtual teams in collaborative process planning was analyzed. The sub tasks with certain timing relationship were described and the model of building virtual teams in collaborative process planning was established, which was solved by improved ant colony algorithm. In this paper applications of the IMACO and ACO are compared and demonstrate that the use of the IMACO algorithm performs better. An example was studied to illustrate the effectiveness of the strategy.

  10. The importance of team functioning to natural resource planning outcomes.

    Science.gov (United States)

    Stern, Marc J; Predmore, S Andrew

    2012-09-15

    In its recent history, the U.S. Forest Service is among many federal land management agencies struggling with questions concerning why its planning procedures are sometimes inefficient, perform poorly in the eyes of the public, and fail to deliver outputs that advance agency mission. By examining a representative sample of National Environmental Policy Act (NEPA) processes conducted by the agency between 2007 and 2009, we provide new insights into what drives outcomes in these planning processes. We examined team leaders' perceptions of the following outcomes: achievement of agency goals and NEPA mandates, process efficiency, public relations, and team outcomes. The most consistently important predictors of positive outcomes were team harmony and a clearly empowered team leader. Other factors, such as perceptions of the use of best science, a clear and unambiguous purpose and need, team turnover (personnel changes during the process), extra-agency engagement, and intra-agency relations, were also important, but played a less consistent role. The findings suggest the importance of empowering team leaders and team members through enhancing elements of discretion, responsibility, clear role definition, collaborative interdisciplinary deliberation, and perceived self-efficacy. The results also suggest the importance of genuine concern and respect for participating publics and effective inter-agency coordination. Copyright © 2012 Elsevier Ltd. All rights reserved.

  11. MRP (materiel requirements planning) II education: a team-building experience.

    Science.gov (United States)

    Iemmolo, G R

    1994-05-01

    Conestoga Wood Specialties, a leader in the woodworking industry, is constantly striving for continuous improvement in manufacturing and service. Recently, the company embarked on a major MRP II education effort that served as a framework for team building. This team building concept has carried over into other aspects related to the business, such as the formalization of the sales and operations planning meeting. At Conestoga Wood, it is recognized that successful team building is necessary to achieve and maintain world-class performance.

  12. [Social representation of a healthcare team on family planning and female sterilization].

    Science.gov (United States)

    Marcolino, Clarice

    2004-12-01

    The objective in this qualitative study was to obtain the discourse of the members of a healthcare team on family planning and female sterilization, and those practical effects on the work of the team. Marxist dialectic and social representations were used as references. Data were obtained by interviews and observations of certain activities of the members of the healthcare team and were subjected to analysis of the discourse. Family planning and female sterilization were considered to be rights, which pertained to the women, although the exercise of those rights is hindered by the limitations of access to contraceptive methods in general.

  13. Individual versus interprofessional team performance in formulating care transition plans: A randomised study of trainees from five professional groups.

    Science.gov (United States)

    Farrell, Timothy W; Supiano, Katherine P; Wong, Bob; Luptak, Marilyn K; Luther, Brenda; Andersen, Troy C; Wilson, Rebecca; Wilby, Frances; Yang, Rumei; Pepper, Ginette A; Brunker, Cherie P

    2018-05-01

    Health professions trainees' performance in teams is rarely evaluated, but increasingly important as the healthcare delivery systems in which they will practice move towards team-based care. Effective management of care transitions is an important aspect of interprofessional teamwork. This mixed-methods study used a crossover design to randomise health professions trainees to work as individuals and as teams to formulate written care transition plans. Experienced external raters assessed the quality of the written care transition plans as well as both the quality of team process and overall team performance. Written care transition plan quality did not vary between individuals and teams (21.8 vs. 24.4, respectively, p = 0.42). The quality of team process did not correlate with the quality of the team-generated written care transition plans (r = -0.172, p = 0.659). However, there was a significant correlation between the quality of team process and overall team performance (r = 0.692, p = 0.039). Teams with highly engaged recorders, performing an internal team debrief, had higher-quality care transition plans. These results suggest that high-quality interprofessional care transition plans may require advance instruction as well as teamwork in finalising the plan.

  14. The One Plan Project: A cooperative effort of the National Response Team and the Region 6 Regional Response Team to simplify facility emergency response planning

    International Nuclear Information System (INIS)

    Staves, J.; McCormick, K.

    1997-01-01

    The National Response Team (NRT) in coordination with the Region 6 Response Team (RRT) have developed a facility contingency plan format which would integrate all existing regulatory requirements for contingency planning. This format was developed by a multi-agency team, chaired by the USEPA Region 6, in conjunction with various industry, labor, and public interest groups. The impetus for this project came through the USEPA Office of Chemical Emergency Preparedness and Prevention (CEPPO). The current national oil and hazardous material emergency preparedness and response system is an amalgam of federal, state, local, and industrial programs which are often poorly coordinated. In a cooperative effort with the NRT, the CEPPO conducted a Presidential Review of federal agency authorities and coordination responsibilities regarding release prevention, mitigation, and response. Review recommendations led to a Pilot Project in USEPA Region 6. The Region 6 Pilot Project targeted end users in the intensely industrialized Houston Ship Channel (HSC) area, which is comprised of petroleum and petrochemical companies

  15. Plan for gas overcrowding; Development in last decade

    International Nuclear Information System (INIS)

    Unidad de Planeacion Minero Energetica, UPME

    2000-01-01

    The plan for gas overcrowding, is one of the most important determinations of energy politics in last decade. It is an integral plan of consumption of combustible gas; that is to say, cover the natural gas and the liquefied gas of petroleum. In this article, the UPME wants to show the results of the implementation of this measure. The analysis shows, in the first place the impact achieved in the diversification of the energetic basket, with the penetration of the combustible gas. Facts and indicators of development of the plan are given that include an evaluation of the direct financial benefit that receive the homes, when using a more economic fuel. On the other hand, it puts on of present the government effort carried out through ECOPETROL and that of some private agents to start the plan. Finally, the investments made until today and the problems of low use of some nets of transport, related with the development of the market

  16. Team Learning Beliefs and Behaviours in Response Teams

    Science.gov (United States)

    Boon, Anne; Raes, Elisabeth; Kyndt, Eva; Dochy, Filip

    2013-01-01

    Purpose: Teams, teamwork and team learning have been the subject of many research studies over the last decades. This article aims at investigating and confirming the Team Learning Beliefs and Behaviours (TLB&B) model within a very specific population, i.e. police and firemen teams. Within this context, the paper asks whether the team's…

  17. Strategic Planning and NRC Decadal Survey Experience

    Science.gov (United States)

    Lautenbacher, C. C., Jr.

    2015-12-01

    Strategic planning exercises are routinely undertaken by a wide variety of organizations that span the private, public and academic sectors and with a wide variety of corporate goals. It is difficult to single out best procedures as the purposes of strategic planning are as varied as the organizations. As a former head of a governmental agency that requested such a NRC study, namely the first "Earth Sciences and Applications from Space" study, I will examine the process, provide my definitions and assessments of the good and the not-so-good, and compare to my experiences with other similar strategic planning exercises during my Navy, NOAA, and private sector careers. I find that there is always room for improvement, but there is no one process or procedure that can guarantee success. Overarching initial considerations that can position the effort for overall "success" will be defined and applied to the recent NSC Study: "Sea Change: 2015-2025 Decadal Survey of Ocean Science", for which I was neither an initiator nor a participant, but a very interested observer.

  18. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems

  19. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  20. Emergency team and action plan; Brigada de emergencia y plan de accion de emergencia

    Energy Technology Data Exchange (ETDEWEB)

    Jimenez Gorgerino, Ruben Dario [Central Hidroelectrica Itaipu, Hernandarias (Paraguay)]. E-mail: jimenez@itaipu.gov.br

    1998-07-01

    This work reports the various activities developed by a commission designated for the investigation of the fire occurred in the excitation panel of the generator unit 16, for the execution of two tasks: short term creation of plant emergency team, and a long term implementation of emergency action plan.

  1. Occupational therapists in the interdisciplinary team setting.

    Science.gov (United States)

    Reed, S M

    1984-01-01

    The interdisciplinary team approach to patient care provides an answer to the fragmentation and confusion patients feel when dealing with our complex healthcare system. Even though the team approach has been in use for the past two decades, implementation of a successful team is very difficult and rarely sustained over a significant period of time. This is especially true in general hospitals and in physical rehabilitation programs that spring from general hospitals where the physician and the nurse are the traditional care group. Occupational therapists, as they establish roles on interdisciplinary teams as staff members and team leaders, will require a knowledge of what makes a team function effectively. They can use this knowledge to evaluate the status of their own team and contribute to changes that will insure its long-term success. Six key issues should be addressed during the planning stage of any new healthcare team to insure its continued viability. These issues are: program philosophy, client focus, role clarification, collaboration and information sharing, policies and procedures, and staff supportiveness.

  2. Action plan for the communication process in a nursing team

    Directory of Open Access Journals (Sweden)

    Priscilla Valladares Broca

    2016-06-01

    Full Text Available The objective of this study is to propose an action plan for the communication process in the nursing team. The theoretical references were: the model of a communication process proposed by Berlo and essential concepts of King´s Theory. It is a qualitative, convergent-care research. The data production technique was the semi-structured interview with 25 nurses of a public hospital. Data used the thematic content analysis technique. The elements of the communication team are: perception, self, space, time, stress, role, authority, power, status, audience, empathy and nonverbal communication. The plan proposes a dynamic, flexible, interactive and relational communication process, in order to contribute to the professional qualification and make new practices of care viable. It was concluded that its elements do not have a fixed and stable position, but throughout the process they are used according to the needs of each party.

  3. Team table: a framework and tool for continuous factory planning

    Science.gov (United States)

    Sihn, Wilfried; Bischoff, Juergen; von Briel, Ralf; Josten, Marcus

    2000-10-01

    Growing market turbulences and shorter product life cycles require a continuous adaptation of factory structures resulting in a continuous factory planning process. Therefore a new framework is developed which focuses on configuration and data management process integration. This enable an online system performance evaluation based on continuous availability of current data. The use of this framework is especially helpful and will guarantee high cost and time savings, when used in the early stages of the planning, called the concept or rough planning phase. The new framework is supported by a planning round table as a tool for team-based configuration processes integrating the knowledge of all persons involved in planning processes. A case study conducted at a German company shows the advantages which can be achieved by implementing the new framework and methods.

  4. Provider-Sponsored Health Plans: Lessons Learned over Three Decades.

    Science.gov (United States)

    Breon, Richard C

    2016-01-01

    Healthcare's movement to value-based care is causing health systems across the country to consider whether owning or partnering with a health plan could benefit their organizations. Although organizations have different reasons for wanting to enter the insurance business, potential benefits include improving care quality, lowering costs, managing population health, expanding geographic reach, and diversifying the organization's revenue stream. However, the challenges and risks of owning a health plan are formidable: Assuming 100 percent financial risk for a patient population requires considerable financial resources, as well as competencies that are wholly different from those needed to run a hospital or physician group. For Spectrum Health, an integrated, not-for-profit health system based in Grand Rapids, Michigan, owning a health plan has been vital to fulfilling its mission of improving the health of the communities it serves, as well as its value proposition of providing highquality care at lower costs. This article weighs the pros and cons of operating a health plan; explores key business factors and required competencies that organizations need to consider when deciding whether to buy, build, or partner; examines the current environment for provider-sponsored health plans; and shares some of the lessons Spectrum Health has learned over three decades of running its health plan, Priority Health.

  5. Through The Decades - Changes in Social, Economic, Legal and Planning Determinants of Residential Development across Decades - Evidence from Suburban Areas in Poland

    Science.gov (United States)

    Źróbek-Różańska, Alina; Zysk, Elżbieta; Źróbek, Ryszard

    2017-10-01

    Poland has experienced many political, legal, social and economic transformations. For the last twelve decades, this country was under foreign partition, in the war, under the influence of socialist system with centrally planned economy and finally regained autonomy and rapidly introduced market economy. Each epoch had its own characteristic, that can be recognized also in the residential buildings development. Therefore, the authors focused on the social, economic, legal and planning conditionings that shaped the development of the residential buildings with the most characteristic periods: pre-II world war, 50-ties, 60-ties, 70-ties, 80-ties, 90-ties and XXI century. Some of them are visible in the still existing residential buildings, especially in the suburban villages. The most recent process that can be observed in the study area is urban sprawl. Since the beginning of the XXI century, urban population in Poland has been gradually declining, while suburban villages transform into ‘urban-like’ districts. The aim of the study was to arrange and present in the decade-by-decade manner, the social, economic, legal and planning conditionings that were valid in particular periods. It was realized by correlating information on the contemporary social trends, economic conditions, legal framework and planning regulations. Presentation was enriched by the examples of the buildings developed in the accordance with the contemporary restrictions.

  6. Intraprofessional, team-based treatment planning for oral health students in the comprehensive care clinic.

    Science.gov (United States)

    Mattheos, Nikos; Storrs, Mark; Foster, Lea; Oberholzer, Theunis

    2012-12-01

    In 2009, Griffith University School of Dentistry and Oral Health, in Queensland, Australia, introduced into its various curricula the concept of team-based treatment planning (TBTP), aiming to facilitate intraprofessional, interdisciplinary training and peer learning among its students. Fifty student teams were organized, each of which included students from three programs (Dental Science, Oral Health Therapy, and Dental Technology) and three years of study (third-, fourth-, and fifth-year students). This study prospectively evaluated the impact of TBTP on students' perceptions and attitudes towards teamwork and their role in a team of peers. A total of 202 students who participated in fifty TBTP teams were prospectively surveyed at baseline and at six and twelve months after introduction of TBTP. "Reliable" and "responsible" were reported to be the most important qualities of both an effective team leader and member. Fifth-year students identified "hard-working" as an important quality of the ideal leader as opposed to the fourth-year students who ranked "supportive" higher. Attitudes of the fifth-year students towards TBTP appeared to have declined significantly from the previous years, while fourth-year students remained consistently more positive. In addition, fourth-year students appeared more likely to enjoy working in a team and considered themselves more effective in a team. No gender differences were observed, other than female students' appearing less confident to lead a team. It was concluded that the function of student-directed interdisciplinary, intraprofessional treatment planning teams might pose disproportionate strain on fifth-year students, impacting their attitudes to such modes of work.

  7. Level-2 Milestone 5588: Deliver Strategic Plan and Initial Scalability Assessment by Advanced Architecture and Portability Specialists Team

    Energy Technology Data Exchange (ETDEWEB)

    Draeger, Erik W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-09-30

    This report documents the fact that the work in creating a strategic plan and beginning customer engagements has been completed. The description of milestone is: The newly formed advanced architecture and portability specialists (AAPS) team will develop a strategic plan to meet the goals of 1) sharing knowledge and experience with code teams to ensure that ASC codes run well on new architectures, and 2) supplying skilled computational scientists to put the strategy into practice. The plan will be delivered to ASC management in the first quarter. By the fourth quarter, the team will identify their first customers within PEM and IC, perform an initial assessment and scalability and performance bottleneck for next-generation architectures, and embed AAPS team members with customer code teams to assist with initial portability development within standalone kernels or proxy applications.

  8. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents a complete response to the Tiger Team assessment that was conducted to Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 2, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root cause of the findings identified during the assessment. This report is concerned with reactors safety and health findings, responses, and planned actions. Specific areas include: organization and administration; quality verification; operations; maintenance; training and certification; auxiliary systems; emergency preparedness; technical support; nuclear criticality safety; security/safety interface; experimental activities; site/facility safety review; radiological protection; personnel protection; fire protection; management findings, responses, and planned actions; self-assessment findings, responses, and planned actions; and summary of planned actions, schedules, and costs

  9. The Regional Environmental Emergency Team (REET)

    International Nuclear Information System (INIS)

    Maddock, M.

    2001-01-01

    This paper outlined the approach taken in Ontario to set up the Regional Environmental Emergency Team (REET) teams and the progress made in developing partnerships and coordination in response to environmental emergencies in Ontario. Environment Canada has been involved with the Ontario Regional Environmental Emergency Team (REET) Program for the past decade in order to review emergency response roles and responsibilities. REET is designed to enhance communication between emergency response agencies, foster recognition of the various responsibilities involved in an environmental emergency response and to increase the basic understanding of emergency response techniques and procedures within the emergency response community. During emergency response situations REET operates as a flexible and expandable multi-disciplinary and multi-agency team that provides comprehensive and coordinated environmental advice, information and assistance. The Ontario REET program currently consists of 18 area teams throughout the province with informal partnerships with Environment Canada, the Canadian Coast Guard, the Ontario Ministry of the Environment, Emergency Measures Ontario and the Ontario Ministry of Natural Resources. The program was inspired in 1970 and continues to provide an appropriate forum for environmental emergency planning and response. 6 refs., 1 fig

  10. AN EVALUATION TO IDENTIFY THE BARRIERS TO THE FEASIBILITY OF URBAN DEVELOPMENT PLANS: FIVE DECADES OF EXPERIENCE IN URBAN PLANNING IN IRAN

    Directory of Open Access Journals (Sweden)

    Mohammad Javad Maghsoodi Tilaki

    2014-01-01

    Full Text Available The rapid urbanization in many developing countries has indicat ed several challenges in different aspects. This is due t o inefficient urban planning ap proaches towards managing the development process. Similar to many other developing count ries, Iran has experienced rapid urbanization in recent decades. Although over the last few decades, urban planning processes have been applied to develop Iranian c ities, urban planning has failed to tackle the challenges facing the cities. This paper s eeks to identify the barriers that have prevented Iranian c ities from achieving the goals of urban planning. The purpose of this paper is to provide a comprehensive review of the curre nt literature on the concept of urban planning and to assess the urban development plan proc ess in Iranian cities. The required data were collected through a review of international theoretical studies, Iranian experimental research and governmental reports. The findings of this study reveal five major barriers to the feasibility of the urban planning process , including the urban plans context, structure of urban pla nning, related law and regulatio ns, public participation, and financial resources.

  11. Developing team leadership to facilitate guideline utilization: planning and evaluating a 3-month intervention strategy.

    Science.gov (United States)

    Gifford, Wendy; Davies, Barbara; Tourangeau, Ann; Lefebre, Nancy

    2011-01-01

    Research describes leadership as important to guideline use. Yet interventions to develop current and future leaders for this purpose are not well understood. To describe the planning and evaluation of a leadership intervention to facilitate nurses' use of guideline recommendations for diabetic foot ulcers in home health care. Planning the intervention involved a synthesis of theory and research (qualitative interviews and chart audits). One workshop and three follow-up teleconferences were delivered at two sites to nurse managers and clinical leaders (n=15) responsible for 180 staff nurses. Evaluation involved workshop surveys and interviews. Highest rated intervention components (four-point scale) were: identification of target indicators (mean 3.7), and development of a team leadership action plan (mean 3.5). Pre-workshop barriers assessment rated lowest (mean 2.9). Three months later participants indicated their leadership performance had changed as a result of the intervention, being more engaged with staff and clear about implementation goals. Creating a team leadership action plan to operationalize leadership behaviours can help in delivery of evidence-informed care. Access to clinical data and understanding team leadership knowledge and skills prior to formal training will assist nursing management in tailoring intervention strategies to identify needs and gaps. © 2010 The Authors. Journal compilation © 2010 Blackwell Publishing Ltd.

  12. Improving Care Teams' Functioning: Recommendations from Team Science.

    Science.gov (United States)

    Fiscella, Kevin; Mauksch, Larry; Bodenheimer, Thomas; Salas, Eduardo

    2017-07-01

    Team science has been applied to many sectors including health care. Yet there has been relatively little attention paid to the application of team science to developing and sustaining primary care teams. Application of team science to primary care requires adaptation of core team elements to different types of primary care teams. Six elements of teams are particularly relevant to primary care: practice conditions that support or hinder effective teamwork; team cognition, including shared understanding of team goals, roles, and how members will work together as a team; leadership and coaching, including mutual feedback among members that promotes teamwork and moves the team closer to achieving its goals; cooperation supported by an emotionally safe climate that supports expression and resolution of conflict and builds team trust and cohesion; coordination, including adoption of processes that optimize efficient performance of interdependent activities among team members; and communication, particularly regular, recursive team cycles involving planning, action, and debriefing. These six core elements are adapted to three prototypical primary care teams: teamlets, health coaching, and complex care coordination. Implementation of effective team-based models in primary care requires adaptation of core team science elements coupled with relevant, practical training and organizational support, including adequate time to train, plan, and debrief. Training should be based on assessment of needs and tasks and the use of simulations and feedback, and it should extend to live action. Teamlets represent a potential launch point for team development and diffusion of teamwork principles within primary care practices. Copyright © 2017 The Joint Commission. Published by Elsevier Inc. All rights reserved.

  13. Opportunities in Nuclear Science: A Long-Range Plan for the Next Decade

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2002-04-01

    The DOE/NSF Nuclear Science Advisory Committee of the Department of Energy and the National Science Foundation is charged with providing advice on a continuing basis regarding the management of the national basic nuclear science research program. In July 2000, the Committee was asked to study the opportunities and priorities for U.S. nuclear physics research, and to develop a long-range plan that will serve as a frame-work for the coordinated advancement of the field for the next decade. The plan contained here is the fifth that has been pre-pared since the Committee was established. Each of the earlier plans has had substantial impact on new directions and initiatives in the field.

  14. Better team management--better team care?

    Science.gov (United States)

    Shelley, P; Powney, B

    1994-01-01

    Team building should not be a 'bolt-on' extra, it should be a well planned, integrated part of developing teams and assisting their leaders. When asked to facilitate team building by a group of NHS managers we developed a framework which enabled individual members of staff to become more effective in the way they communicated with each other, their teams and in turn within the organization. Facing the challenge posed by complex organizational changes, staff were able to use 3 training days to increase and develop their awareness of the principles of teamwork, better team management, and how a process of leadership and team building could help yield better patient care.

  15. Strategic conservation planning for the Eastern North Carolina/Southeastern Virginia Strategic Habitat Conservation Team

    Science.gov (United States)

    Alexander-Vaughn, Louise B.; Collazo, Jaime A.; Drew, C. Ashton

    2014-01-01

    The Eastern North Carolina/Southeastern Virginia Strategic Habitat Conservation Team (ENCSEVA) is a partnership among local federal agencies and programs with a mission to apply Strategic Habitat Conservation to accomplish priority landscape-level conservation within its geographic region. ENCSEVA seeks to further landscape-scale conservation through collaboration with local partners. To accomplish this mission, ENCSEVA is developing a comprehensive Strategic Habitat Conservation Plan (Plan) to provide guidance for its members, partners, and collaborators by establishing mutual conservation goals, objectives, strategies, and metrics to gauge the success of conservation efforts. Identifying common goals allows the ENCSEVA team to develop strategies that leverage joint resources and are more likely to achieve desired impacts across the landscape. The Plan will also provide an approach for ENCSEVA to meet applied research needs (identify knowledge gaps), foster adaptive management principles, identify conservation priorities, prioritize threats (including potential impacts of climate change), and identify the required capacity to implement strategies to create more resilient landscapes. ENCSEVA seeks to support the overarching goals of the South Atlantic Landscape Conservation Cooperative (SALCC) and to provide scientific and technical support for conservation at landscape scales as well as inform the management of natural resources in response to shifts in climate, habitat fragmentation and loss, and other landscape-level challenges (South Atlantic LCC 2012). The ENCSEVA ecoregion encompasses the northern third of the SALCC geography and offers a unique opportunity to apply landscape conservation at multiple scales through the guidance of local conservation and natural resource management efforts and by reporting metrics that reflect the effectiveness of those efforts (Figure 1). The Environmental Decision Analysis Team, housed within the North Carolina Cooperative

  16. Asian Tracer Experiment and Atmospheric Modeling (TEAM) Project: Draft Field Work Plan for the Asian Long-Range Tracer Experiment

    Energy Technology Data Exchange (ETDEWEB)

    Allwine, K Jerry; Flaherty, Julia E.

    2007-08-01

    This report provides an experimental plan for a proposed Asian long-range tracer study as part of the international Tracer Experiment and Atmospheric Modeling (TEAM) Project. The TEAM partners are China, Japan, South Korea and the United States. Optimal times of year to conduct the study, meteorological measurements needed, proposed tracer release locations, proposed tracer sampling locations and the proposed durations of tracer releases and subsequent sampling are given. Also given are the activities necessary to prepare for the study and the schedule for completing the preparation activities leading to conducting the actual field operations. This report is intended to provide the TEAM members with the information necessary for planning and conducting the Asian long-range tracer study. The experimental plan is proposed, at this time, to describe the efforts necessary to conduct the Asian long-range tracer study, and the plan will undoubtedly be revised and refined as the planning goes forward over the next year.

  17. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment. Volume 1, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  18. Improving supervision: a team approach.

    Science.gov (United States)

    1993-01-01

    This issue of "The Family Planning Manager" outlines an interactive team supervision strategy as a means of improving family planning service quality and enabling staff to perform to their maximum potential. Such an approach to supervision requires a shift from a monitoring to a facilitative role. Because supervisory visits to the field are infrequent, the regional supervisor, clinic manager, and staff should form a team to share ongoing supervisory responsibilities. The team approach removes individual blame and builds consensus. An effective team is characterized by shared leadership roles, concrete work problems, mutual accountability, an emphasis on achieving team objectives, and problem resolution within the group. The team supervision process includes the following steps: prepare a visit plan and schedule; meet with the clinic manager and staff to explain how the visit will be conducted; supervise key activity areas (clinical, management, and personnel); conduct a problem-solving team meeting; conduct a debriefing meeting with the clinic manager; and prepare a report on the visit, including recommendations and follow-up plans. In Guatemala's Family Planning Unit, teams identify problem areas on the basis of agreement that a problem exists, belief that the problem can be solved with available resources, and individual willingness to accept responsibility for the specific actions identified to correct the problem.

  19. Managing creative team performance in virtual environments : An empirical study in 44 R&D teams

    NARCIS (Netherlands)

    Kratzer, J.; Leenders, R.Th.A.J.; van Engelen, J.M.L.

    Creative performance in R&D is of vital importance to organizations. Because R&D usually is organized in teams, the management of creative performance inherently refers to the team level creative performance. Over the last decades, R&D teams have become increasingly virtual. In this article we

  20. On teams, teamwork, and team performance: discoveries and developments.

    Science.gov (United States)

    Salas, Eduardo; Cooke, Nancy J; Rosen, Michael A

    2008-06-01

    We highlight some of the key discoveries and developments in the area of team performance over the past 50 years, especially as reflected in the pages of Human Factors. Teams increasingly have become a way of life in many organizations, and research has kept up with the pace. We have characterized progress in the field in terms of eight discoveries and five challenges. Discoveries pertain to the importance of shared cognition, the measurement of shared cognition, advances in team training, the use of synthetic task environments for research, factors influencing team effectiveness, models of team effectiveness, a multidisciplinary perspective, and training and technological interventions designed to improve team effectiveness. Challenges that are faced in the coming decades include an increased emphasis on team cognition; reconfigurable, adaptive teams; multicultural influences; and the need for naturalistic study and better measurement. Work in human factors has contributed significantly to the science and practice of teams, teamwork, and team performance. Future work must keep pace with the increasing use of teams in organizations. The science of teams contributes to team effectiveness in the same way that the science of individual performance contributes to individual effectiveness.

  1. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  2. Sensitivity analysis in electric system expansion planning study using DECADES

    International Nuclear Information System (INIS)

    Perez Martin, D.; Lopez Lopez, I.

    1998-01-01

    To cover the increasing electricity demand as a key economic and social factor of development, it is necessary to have adequate expansion police. The delay in installation of certain capabilities produces electricity deficit. In other hand, construction of oversized capacities generates excessive costs. Therefore it is important to acquire or develop adequate methodologies according to the country specific conditions to carry out electric expansion planning studies. The goal is to chose optimal solutions in order to reach sustainable development using owns energy resources and preserving the environment. In the paper the Decades methodology is used for electricity system expansion planning. Premises and main assumptions for the calculations are presented. Some electric system expansion cases are evaluated. We also present the results of a sensibility study varying the discount rate, loss of load probability energy not served cost, fuel availability and fuel and investment costs. The reliability criteria currently not used in Cuban electric system are evaluated. We discuss the results and display the conclusions and recommendations

  3. Corrective Action Plan in response to the March 1992 Tiger Team Assessment of the Ames Laboratory

    International Nuclear Information System (INIS)

    1992-01-01

    On March 5, 1992, a Department of Energy (DOE) Tiger Team completed an assessment of the Ames Laboratory, located in Ames, Iowa. The purpose of the assessment was to provide the Secretary of Energy with a report on the status and performance of Environment, Safety and Health (ES ampersand H) programs at Ames Laboratory. Detailed findings of the assessment are presented in the report, DOE/EH-0237, Tiger Team Assessment of the Ames Laboratory. This document, the Ames Laboratory Corrective Action Plan (ALCAP), presents corrective actions to overcome deficiencies cited in the Tiger Team Assessment. The Tiger Team identified 53 Environmental findings, from which the Team derived four key findings. In the Safety and Health (S ampersand H) area, 126 concerns were identified, eight of which were designated Category 11 (there were no Category I concerns). Seven key concerns were derived from the 126 concerns. The Management Subteam developed 19 findings which have been summarized in four key findings. The eight S ampersand H Category 11 concerns identified in the Tiger Team Assessment were given prompt management attention. Actions to address these deficiencies have been described in individual corrective action plans, which were submitted to DOE Headquarters on March 20, 1992. The ALCAP includes actions described in this early response, as well as a long term strategy and framework for correcting all remaining deficiencies. Accordingly, the ALCAP presents the organizational structure, management systems, and specific responses that are being developed to implement corrective actions and to resolve root causes identified in the Tiger Team Assessment. The Chicago Field Office (CH), IowaState University (ISU), the Institute for Physical Research and Technology (IPRT), and Ames Laboratory prepared the ALCAP with input from the DOE Headquarters, Office of Energy Research (ER)

  4. [A decade of reflection on health plans in Spain. SESPAS report 2010].

    Science.gov (United States)

    Fiuza Pérez, María Dolores; Aguiar Rodríguez, Juan Francisco; Monzón Batista, Nayra

    2010-12-01

    This article reports the experience of the Working Group of the SESPAS-SCSP (Spanish Society of Public Health and Healthcare Administration-Canary Islands Society of Public Health) in health policy and planning during the first decade of the 21st century and its possible impact on the design of health planning. We review the conclusions reached from 2000 to 2008 in the first five Biannual Planning and Health Policy meetings that took place during that period. The workshops were designed with two speakers who presented different views of the subject under discussion, a moderator, who led the debate on the findings, and a narrator who served as a notary and also took responsibility for the text summary of each table. Two general narrators were responsible for the final wording of the conclusions of each workshop or biannual meeting. From 2000 to 2008, there were 25 round tables with 121 conclusions and 160 participants. We believe that the SESPAS working groups provide multidisciplinary professional values within a context of debate in a professional environment, and create spaces for reflection, thus helping to improve the health planning system in Spain. Copyright © 2010 SESPAS. Published by Elsevier Espana. All rights reserved.

  5. STS-49 Endeavour, Orbiter Vehicle (OV) 105, Planning Team in MCC Bldg 30 FCR

    Science.gov (United States)

    1992-01-01

    STS-49 Endeavour, Orbiter Vehicle (OV) 105, Planning Team with Flight Director (FD) James M. Heflin, Jr (front right next to ship model) poses in JSC's Mission Control Center (MCC) Bldg 30 Flight Control Room (FCR). The group stands in front of visual displays projecting STS-49 data and ground track map.

  6. The Generational Impact in Virtual Teams

    OpenAIRE

    Ferrara, Samuel Joseph

    2016-01-01

    The world of today allows groups of people who are geographically-distributed to communicate through information and communication technologies (ICTs). In the workplace, these geographically-distributed teams are referred to as virtual teams. Quantifying and understanding issues in virtual teams has been a focus of research for the past two decades. This thesis aims to quantify generational differences between the Millennials and the Baby Boomers in the context of virtual teams in the enginee...

  7. Program Development Plan and Team up

    Energy Technology Data Exchange (ETDEWEB)

    Solar Electric Power Association

    2001-12-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead.

  8. Effects of time pressure and communication environment on team processes and outcomes in dyadic planning

    NARCIS (Netherlands)

    Kleij, R van der; Lijkwan, J.T.E..; Dreu, C.K.W. de

    2009-01-01

    An experiment compared dyadic performance in a radio communication and a more sophisticated communication environment to face-to-face (FtF) meetings. Thirty-six dyads, working under low or high time-pressure conditions, needed to combine information and to produce a written plan. Teams working in

  9. Report on the emergency evacuation review team on emergency response plans for the Perry and Davis-Besse nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    This book is a report by Ohio's Emergency Evacuation Review Team, at the request of Governor Richard Celeste. The Team concludes that the current emergency response plan for Ohio's reactors is inadequate to protect the public and recommends changes in the current emergency plant requirements. The report also includes a summary of the litigation that has occurred since Celeste withdrew his support for the plans, a list of experts consulted, and sources used to prepare the report. An important document, and a study which every state should undertake

  10. 40 CFR 300.110 - National Response Team.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 27 2010-07-01 2010-07-01 false National Response Team. 300.110... PLAN Responsibility and Organization for Response § 300.110 National Response Team. National planning... agencies named in § 300.175(b). Each agency shall designate a member to the team and sufficient alternates...

  11. Team behaviors in emergency care: a qualitative study using behavior analysis of what makes team work.

    Science.gov (United States)

    Mazzocato, Pamela; Forsberg, Helena Hvitfeldt; Schwarz, Ulrica von Thiele

    2011-11-15

    Teamwork has been suggested as a promising approach to improving care processes in emergency departments (ED). However, for teamwork to yield expected results, implementation must involve behavior changes. The aim of this study is to use behavior analysis to qualitatively examine how teamwork plays out in practice and to understand eventual discrepancies between planned and actual behaviors. The study was set in a Swedish university hospital ED during the initial phase of implementation of teamwork. The intervention focused on changing the environment and redesigning the work process to enable teamwork. Each team was responsible for entire care episodes, i.e. from patient arrival to discharge from the ED. Data was collected through 3 days of observations structured around an observation scheme. Behavior analysis was used to pinpoint key teamwork behaviors for consistent implementation of teamwork and to analyze the contingencies that decreased or increased the likelihood of these behaviors. We found a great discrepancy between the planned and the observed teamwork processes. 60% of the 44 team patients observed were handled solely by the appointed team members. Only 36% of the observed patient care processes started according to the description in the planned teamwork process, that is, with taking patient history together. Beside this behavior, meeting in a defined team room and communicating with team members were shown to be essential for the consistent implementation of teamwork. Factors that decreased the likelihood of these key behaviors included waiting for other team members or having trouble locating each other. Getting work done without delay and having an overview of the patient care process increased team behaviors. Moreover, explicit instructions on when team members should interact and communicate increased adherence to the planned process. This study illustrates how behavior analysis can be used to understand discrepancies between planned and observed

  12. Planning and management of change

    International Nuclear Information System (INIS)

    Nelson, R.M. Jr.; Statton, C.T.; St. Clair, R.K.

    1994-01-01

    The 1990s promise to be a decade of change. In business, the focus will be on restructuring for purposes of improved productivity and efficiency. The Department of Energy (DOE) has recognized that change is on the horizon. The Yucca Mountain Project, carried out under the Office of Civilian Radioactive Waste Management (OCRWM) within the DOE is under new leadership. This new leadership is restructuring its operations to provide better focus, greater efficiency, meaningful products demonstrating progress and a more open operational environment. Criticisms of past operations have been reviewed and evaluated such that the new management organization derives benefit from the past. In recognition that management concerns may be manifested in other areas, Yucca Mountain Project management believes that reorganization is necessary to maximize efficiency. In designing the new organization, a high priority has been placed upon making changes which enable the federal leadership to exercise appropriate control and make participants more responsible and accountable for their work. Transition to the new organization will be implemented in four phases: (1) establishing the management construct, (2) defining roles and responsibilities of functional management, (3) development of the task performance teams, and (4) subsequent evolution of the open-quotes project teamclose quotes as a whole. A program-wide strategic plan is being prepared which includes a variety of revisions to the program of the past. This plan charts the path the Department will follow in fulfilling its mission. The vision of the new management developed by the DOE focuses on the creation of open-quotes teams,close quotes both a management team and task performance teams. The new management team will be tasked with implementing the plan

  13. The productivity effects of profit sharing, employee ownership, stock option and team incentive plans: Evidence from korean panel data

    OpenAIRE

    Kato, Takao; Lee, Ju Ho; Ryu, Jang-soo

    2010-01-01

    We report the first results for Korean firms on the incidence, diffusion, scope and effects of diverse employee financial participation schemes, such as Profit Sharing Plans (PSPs), Employee Stock Ownership Plans (ESOPs), Stock Option Plans (SOPs) and Team Incentive Plans (TIPs). In do doing, we assemble important new panel data by merging data from a survey of all Korean firms listed on Korean Stock Exchange which enjoys an unusually high response rate of 60 percent with accounting data from...

  14. National Response Team

    Science.gov (United States)

    Response planning and coordination (not direct response itself) is accomplished at the federal level through the U.S. National Response Team (NRT), an interagency group co-chaired by EPA and U.S. Coast Guard. NRT distributes information, plans, and trains.

  15. New York State Middle Schools and Instructional Scheduling, Teaming and Common Planning: A Descriptive Study

    Science.gov (United States)

    Corey, Chad; Babo, Gerard

    2016-01-01

    Data regarding the type of instructional scheduling utilized along with the use of teaming and common planning at the middle school level has not been collected nor reported on the New York State School Report Card, and therefore it is not known whether and how middle schools are implementing these three school supports. Consequently, the purpose…

  16. Program Development Plan and Team up; FINAL

    International Nuclear Information System (INIS)

    Solar Electric Power Association

    2001-01-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead

  17. Three images of interdisciplinary team meetings.

    Science.gov (United States)

    Crepeau, E B

    1994-08-01

    Teams are an essential aspect of health care today, especially in rehabilitation or chronic illness where the course of care is frequently long, complex, and unpredictable. The coordinative function of teams and their interdisciplinary aspects are thought to improve patient care because team members bring their unique professional skills together to address patient problems. This coordination is enacted through the team meeting, which typically results in an integrated care plan. This professional image of team meetings is explicit and addresses the description and provision of care as objective and rational activities. In contrast, the constructed and ritualistic images of health care team meetings are implicit and concern the less objective and rational aspects of planning care. The constructed image pertains to the definitional activity of team members as they try to understand patient troubles and achieve consensus. This process involves the individual clinical reasoning of team members and the collective reasoning of the group. The ritualistic image is that aspect of team meetings in which the team affirms and reaffirms its collective identity. Drawing from field research of geropsychiatric team meetings, this article defines and explicates these images, focusing on the constructed and ritualistic aspects of team meetings and the influence of these images on group function.

  18. Advance Care Planning: Understanding Clinical Routines and Experiences of Interprofessional Team Members in Diverse Health Care Settings.

    Science.gov (United States)

    Arnett, Kelly; Sudore, Rebecca L; Nowels, David; Feng, Cindy X; Levy, Cari R; Lum, Hillary D

    2017-12-01

    Interprofessional health care team members consider advance care planning (ACP) to be important, yet gaps remain in systematic clinical routines to support ACP. A clearer understanding of the interprofessional team members' perspectives on ACP clinical routines in diverse settings is needed. One hundred eighteen health care team members from community-based clinics, long-term care facilities, academic clinics, federally qualified health centers, and hospitals participated in a 35-question, cross-sectional online survey to assess clinical routines, workflow processes, and policies relating to ACP. Respondents were 53% physicians, 18% advanced practice nurses, 11% nurses, and 18% other interprofessional team members including administrators, chaplains, social workers, and others. Regarding clinical routines, respondents reported that several interprofessional team members play a role in facilitating ACP (ie, physician, social worker, nurse, others). Most (62%) settings did not have, or did not know of, policies related to ACP documentation. Only 14% of settings had a patient education program. Two-thirds of the respondents said that addressing ACP is a high priority and 85% felt that nonphysicians could have ACP conversations with appropriate training. The clinical resources needed to improve clinical routines included training for providers and staff, dedicated staff to facilitate ACP, and availability of patient/family educational materials. Although interprofessional health care team members consider ACP a priority and several team members may be involved, clinical settings lack systematic clinical routines to support ACP. Patient educational materials, interprofessional team training, and policies to support ACP clinical workflows that do not rely solely on physicians could improve ACP across diverse clinical settings.

  19. Multidisciplinary team functioning.

    Science.gov (United States)

    Kovitz, K E; Dougan, P; Riese, R; Brummitt, J R

    1984-01-01

    This paper advocates the need to move beyond interdisciplinary team composition as a minimum criterion for multidisciplinary functioning in child abuse treatment. Recent developments within the field reflect the practice of shared professional responsibility for detection, case management and treatment. Adherence to this particular model for intervention requires cooperative service planning and implementation as task related functions. Implicitly, this model also carries the potential to incorporate the supportive functioning essential to effective group process. However, explicit attention to the dynamics and process of small groups has been neglected in prescriptive accounts of multidisciplinary child abuse team organization. The present paper therefore focuses upon the maintenance and enhancement aspects of multidisciplinary group functioning. First, the development and philosophy of service for the Alberta Children's Hospital Child Abuse Program are reviewed. Second, composition of the team, it's mandate for service, and the population it serves are briefly described. Third, the conceptual framework within which the program functions is outlined. Strategies for effective group functioning are presented and the difficulties encountered with this model are highlighted. Finally, recommendations are offered for planning and implementing a multidisciplinary child abuse team and for maintaining its effective group functioning.

  20. Determinants of treatment plan implementation in multidisciplinary team meetings for patients with chronic diseases: a mixed-methods study.

    Science.gov (United States)

    Raine, Rosalind; Xanthopoulou, Penny; Wallace, Isla; Nic A' Bháird, Caoimhe; Lanceley, Anne; Clarke, Alex; Livingston, Gill; Prentice, Archie; Ardron, Dave; Harris, Miriam; King, Michael; Michie, Susan; Blazeby, Jane M; Austin-Parsons, Natalie; Gibbs, Simon; Barber, Julie

    2014-10-01

    Multidisciplinary team (MDT) meetings are assumed to produce better decisions and are extensively used to manage chronic disease in the National Health Service (NHS). However, evidence for their effectiveness is mixed. Our objective was to investigate determinants of MDT effectiveness by examining factors influencing the implementation of MDT treatment plans. This is a proxy measure of effectiveness, because it lies on the pathway to improvements in health, and reflects team decision making which has taken account of clinical and non-clinical information. Additionally, this measure can be compared across MDTs for different conditions. We undertook a prospective mixed-methods study of 12 MDTs in London and North Thames. Data were collected by observation of 370 MDT meetings, interviews with 53 MDT members, and from 2654 patient medical records. We examined the influence of patient-related factors (disease, age, sex, deprivation, whether their preferences and other clinical/health behaviours were mentioned) and MDT features (as measured using the 'Team Climate Inventory' and skill mix) on the implementation of MDT treatment plans. The adjusted odds (or likelihood) of implementation was reduced by 25% for each additional professional group represented at the MDT meeting. Implementation was more likely in MDTs with clear goals and processes and a good 'Team Climate' (adjusted OR 1.96; 95% CI 1.15 to 3.31 for a unit increase in Team Climate Inventory (TCI) score). Implementation varied by disease category, with the lowest adjusted odds of implementation in mental health teams. Implementation was also lower for patients living in more deprived areas (adjusted odds of implementation for patients in the most compared with least deprived areas was 0.60, 95% CI 0.39 to 0.91). Greater multidisciplinarity is not necessarily associated with more effective decision making. Explicit goals and procedures are also crucial. Decision implementation should be routinely monitored to

  1. Goal Orientation in Teams: The Role of Diversity

    NARCIS (Netherlands)

    A. Nederveen Pieterse (Anne)

    2009-01-01

    textabstractOrganizations make increasingly use of teams as their basic structure, making it more and more important to determine what enables optimal team functioning. Over the past decades, the goals people focus on in achievement settings (i.e. goal orientation) is shown to be highly important

  2. Rapid improvement teams.

    Science.gov (United States)

    Alemi, F; Moore, S; Headrick, L; Neuhauser, D; Hekelman, F; Kizys, N

    1998-03-01

    Suggestions, most of which are supported by empirical studies, are provided on how total quality management (TQM) teams can be used to bring about faster organizationwide improvements. Ideas are offered on how to identify the right problem, have rapid meetings, plan rapidly, collect data rapidly, and make rapid whole-system changes. Suggestions for identifying the right problem include (1) postpone benchmarking when problems are obvious, (2) define the problem in terms of customer experience so as not to blame employees nor embed a solution in the problem statement, (3) communicate with the rest of the organization from the start, (4) state the problem from different perspectives, and (5) break large problems into smaller units. Suggestions for having rapid meetings include (1) choose a nonparticipating facilitator to expedite meetings, (2) meet with each team member before the team meeting, (3) postpone evaluation of ideas, and (4) rethink conclusions of a meeting before acting on them. Suggestions for rapid planning include reducing time spent on flowcharting by focusing on the future, not the present. Suggestions for rapid data collection include (1) sample patients for surveys, (2) rely on numerical estimates by process owners, and (3) plan for rapid data collection. Suggestions for rapid organizationwide implementation include (1) change membership on cross-functional teams, (2) get outside perspectives, (3) use unfolding storyboards, and (4) go beyond self-interest to motivate lasting change in the organization. Additional empirical investigations of time saved as a consequence of the strategies provided are needed. If organizations solve their problems rapidly, fewer unresolved problems may remain.

  3. Energy and nuclear power planning study for Algeria

    International Nuclear Information System (INIS)

    1985-01-01

    This study, conducted jointly by a team of engineers and economists from the Sonelgaz company and the IAEA, had three objectives: (1) To perform a preliminary economic study aimed at initiating thinking on the role that nuclear power could play in Algeria's long-term energy structure and to suggest reasonable hypotheses on what share of the energy market nuclear power might supply. (2) To train a team of Algerian engineers and economists in long-term economic planning techniques. Once the team has gained a basic knowledge through this preliminary study, it will be in a position to continue the process, to perform other, more detailed independent analyses and to review the entire process should economic conditions change. (3) To introduce in Algeria the computer techniques and facilities needed to carry out such energy investment planning studies for electricity production. The main aim throughout the studies was to train a team of Algerian engineers in energy planning rather than to come to definitive conclusions on the problem of introducing nuclear power in Algeria. Two successive analyses were performed. The first consisted in evaluating the final energy requirements which will result in the medium and long term (by 2015) from the implementation of the economic development policies in the Five Year Plan (up to 1984) and in the proposals for the next decade (up to 1990) being studied by the Algerian Ministry of Planning. The second part is concerned only with the results regarding future electricity requirements, which are used as input data in studying the optimization of Algeria's future electricity generating system. Various methods of generation are analysed and included in an econometric model in order to make a sequential determination of the most economic composition of power generating capacity

  4. The impact of brief team communication, leadership and team behavior training on ad hoc team performance in trauma care settings.

    Science.gov (United States)

    Roberts, Nicole K; Williams, Reed G; Schwind, Cathy J; Sutyak, John A; McDowell, Christopher; Griffen, David; Wall, Jarrod; Sanfey, Hilary; Chestnut, Audra; Meier, Andreas H; Wohltmann, Christopher; Clark, Ted R; Wetter, Nathan

    2014-02-01

    Communication breakdowns and care coordination problems often cause preventable adverse patient care events, which can be especially acute in the trauma setting, in which ad hoc teams have little time for advanced planning. Existing teamwork curricula do not address the particular issues associated with ad hoc emergency teams providing trauma care. Ad hoc trauma teams completed a preinstruction simulated trauma encounter and were provided with instruction on appropriate team behaviors and team communication. Teams completed a postinstruction simulated trauma encounter immediately afterward and 3 weeks later, then completed a questionnaire. Blinded raters rated videotapes of the simulations. Participants expressed high levels of satisfaction and intent to change practice after the intervention. Participants changed teamwork and communication behavior on the posttest, and changes were sustained after a 3-week interval, though there was some loss of retention. Brief training exercises can change teamwork and communication behaviors on ad hoc trauma teams. Copyright © 2014 Elsevier Inc. All rights reserved.

  5. The Benefits of Team Teaching.

    Science.gov (United States)

    Morganti, Deena J.; Buckalew, Flora C.

    1991-01-01

    Discussion of team teaching focuses on librarians team teaching a course on information search strategy at the Pennsylvania State Berks Campus Library. Course requirements are described, planning for the course is discussed, grading practices are reviewed, and course and instructor evaluations are described. (two references) (LRW)

  6. Training van crisismanagement-teams [Training of emergency management teams

    NARCIS (Netherlands)

    Berlo, M.P.W. van; Stroomer, S.; Bosch, K. van den

    2003-01-01

    Een rampenplan of bedrijfsnoodplan bestaat veelal slechts uit een lijst met telefoonnummers, of het is een plan dat niet is geactualiseerd. Bovendien is het trainen van crisismanagement-teams lastig omdat crises vaak een onvoorspelbaar karakter hebben. in deze bijdrage worden twee methoden

  7. Task and Motion Planning for Selective Weed Conrol using a Team of Autonomous Vehicles

    DEFF Research Database (Denmark)

    Hameed, Ibrahim; la Cour-Harbo, Anders; Hansen, Karl Damkjær

    2014-01-01

    with the right amount. In this article, a task and motion planning for a team of autonomous vehicles to reduce chemicals in farming is presented. Field data are collected by small unmanned helicopters equipped with a range of sensors, including multispectral and thermal cameras. Data collected are transmitted...... to a ground station to be analyzed and triggers aerial and ground-based vehicles to start close inspection and/or plant/weed treatment in specified areas. A complete trajectory is generated to enable ground-based vehicle to visit infested areas and start chemical/mechanical weed treatment....

  8. Open innovation with an effective open innovation team.

    OpenAIRE

    Vanvoorden, Jonas

    2014-01-01

    This master's thesis explores how open innovation teams can successfully support open innovation inside of an organisation. Open innovation is a paradigm introduced by Henry Chesbrough (2003) a decade ago. It expands the innovation potential of organisations by opening them up to new ways of working with external partners. To implement open innovation, many companies rely on a small group of managers named open innovation teams. Although open innovation teams can potentially be vital for impl...

  9. PHENIX EXPERIMENT AT RHIC: DECADAL PLAN 2004-2013

    International Nuclear Information System (INIS)

    ZAJC, W.

    2003-01-01

    The PHENIX Collaboration has developed a plan for the detailed investigation of quantum chromodynamics in the next decade. The demonstrated capabilities of the PHENIX experiment to measure rare processes in hadronic, leptonic and photonic channels, in combination with RHIC's unparalleled flexibility as a hadronic collider, provides a physics program of extraordinary breadth and depth. A superlative set of measurements to elucidate the states of both hot and cold nuclear matter, and to measure the spin structure of the proton has been identified. The components of this plan include: (1) Definitive measurements that will establish the nature of the matter created in nucleus+nucleus collisions, that will determine if the description of such matter as a quark-gluon plasma is appropriate, and that will quantify both the equilibrium and non-equilibrium features of the produced medium. (2) Precision measurements of the gluon structure of the proton, and of the spin structure of the gluon and sea-quark distributions of the proton via polarized proton+proton collisions. (3) Determination of the gluon distribution in cold nuclear matter using proton+nucleus collisions. Each of these fundamental fields of investigation will be addressed through a program of correlated measurements in some or all of the following channels: (1) Particle production at high transverse momentum, studied via single particle inclusive measurements of identified charged and neutral hadrons, multi-particle correlations and jet production. (2) Direct photon, photon+jet and virtual photon production. (3) Light and heavy vector mesons. (4) Heavy flavor production. These measurements, together with the established PHENIX abilities to identify hadrons at low transverse momentum, to perform detailed centrality selections, and to monitor polarization and luminosity with high precision create a superb opportunity for performing world-class science with PHENIX for the next decade. A portion of this program is

  10. PHENIX EXPERIMENT AT RHIC: DECADAL PLAN 2004-2013

    Energy Technology Data Exchange (ETDEWEB)

    ZAJC,W.ET. AL.

    2003-11-30

    The PHENIX Collaboration has developed a plan for the detailed investigation of quantum chromodynamics in the next decade. The demonstrated capabilities of the PHENIX experiment to measure rare processes in hadronic, leptonic and photonic channels, in combination with RHIC's unparalleled flexibility as a hadronic collider, provides a physics program of extraordinary breadth and depth. A superlative set of measurements to elucidate the states of both hot and cold nuclear matter, and to measure the spin structure of the proton has been identified. The components of this plan include: (1) Definitive measurements that will establish the nature of the matter created in nucleus+nucleus collisions, that will determine if the description of such matter as a quark-gluon plasma is appropriate, and that will quantify both the equilibrium and non-equilibrium features of the produced medium. (2) Precision measurements of the gluon structure of the proton, and of the spin structure of the gluon and sea-quark distributions of the proton via polarized proton+proton collisions. (3) Determination of the gluon distribution in cold nuclear matter using proton+nucleus collisions. Each of these fundamental fields of investigation will be addressed through a program of correlated measurements in some or all of the following channels: (1) Particle production at high transverse momentum, studied via single particle inclusive measurements of identified charged and neutral hadrons, multi-particle correlations and jet production. (2) Direct photon, photon+jet and virtual photon production. (3) Light and heavy vector mesons. (4) Heavy flavor production. These measurements, together with the established PHENIX abilities to identify hadrons at low transverse momentum, to perform detailed centrality selections, and to monitor polarization and luminosity with high precision create a superb opportunity for performing world-class science with PHENIX for the next decade. A portion of this

  11. Modeling the Office of Science ten year facilities plan: The PERI Architecture Tiger Team

    International Nuclear Information System (INIS)

    Supinski, Bronis R de; Gamblin, Todd; Schulz, Martin

    2009-01-01

    The Performance Engineering Institute (PERI) originally proposed a tiger team activity as a mechanism to target significant effort optimizing key Office of Science applications, a model that was successfully realized with the assistance of two JOULE metric teams. However, the Office of Science requested a new focus beginning in 2008: assistance in forming its ten year facilities plan. To meet this request, PERI formed the Architecture Tiger Team, which is modeling the performance of key science applications on future architectures, with S3D, FLASH and GTC chosen as the first application targets. In this activity, we have measured the performance of these applications on current systems in order to understand their baseline performance and to ensure that our modeling activity focuses on the right versions and inputs of the applications. We have applied a variety of modeling techniques to anticipate the performance of these applications on a range of anticipated systems. While our initial findings predict that Office of Science applications will continue to perform well on future machines from major hardware vendors, we have also encountered several areas in which we must extend our modeling techniques in order to fulfill our mission accurately and completely. In addition, we anticipate that models of a wider range of applications will reveal critical differences between expected future systems, thus providing guidance for future Office of Science procurement decisions, and will enable DOE applications to exploit machines in future facilities fully.

  12. [Developing team reflexivity as a learning and working tool for medical teams].

    Science.gov (United States)

    Riskin, Arieh; Bamberger, Peter

    2014-01-01

    Team reflexivity is a collective activity in which team members review their previous work, and develop ideas on how to modify their work behavior in order to achieve better future results. It is an important learning tool and a key factor in explaining the varying effectiveness of teams. Team reflexivity encompasses both self-awareness and agency, and includes three main activities: reflection, planning, and adaptation. The model of briefing-debriefing cycles promotes team reflexivity. Its key elements include: Pre-action briefing--setting objectives, roles, and strategies the mission, as well as proposing adaptations based on what was previously learnt from similar procedures; Post-action debriefing--reflecting on the procedure performed and reviewing the extent to which objectives were met, and what can be learnt for future tasks. Given the widespread attention to team-based work systems and organizational learning, efforts should be made toward ntroducing team reflexivity in health administration systems. Implementation could be difficult because most teams in hospitals are short-lived action teams formed for a particular event, with limited time and opportunity to consciously reflect upon their actions. But it is precisely in these contexts that reflexive processes have the most to offer instead of the natural impulsive collective logics. Team reflexivity suggests a potential solution to the major problems of iatorgenesis--avoidable medical errors, as it forces all team members to participate in a reflexive process together. Briefing-debriefing technology was studied mainly in surgical teams and was shown to enhance team-based learning and to improve quality-related outcomes and safety.

  13. Head and neck multidisciplinary team meetings: Effect on patient management.

    Science.gov (United States)

    Brunner, Markus; Gore, Sinclair M; Read, Rebecca L; Alexander, Ashlin; Mehta, Ankur; Elliot, Michael; Milross, Chris; Boyer, Michael; Clark, Jonathan R

    2015-07-01

    The purpose of this study was for us to present our findings on the prospectively audited impact of head and neck multidisciplinary team meetings on patient management. We collected clinical data, the pre-multidisciplinary team meeting treatment plan, the post-multidisciplinary team meeting treatment plans, and follow-up data from all patients discussed at a weekly multidisciplinary team meeting and we recorded the changes in management. One hundred seventy-two patients were discussed in 39 meetings. In 52 patients (30%), changes in management were documented of which 20 (67%) were major. Changes were statistically more likely when the referring physician was a medical or radiation oncologist, when the initial treatment plan did not include surgery, and when the histology was neither mucosal squamous cell cancer nor a skin malignancy. Compliance to the multidisciplinary team meeting treatment recommendation was 84% for all patients and 70% for patients with changes in their treatment recommendation. Head and neck multidisciplinary team meetings changed management in almost a third of the cases. © 2014 Wiley Periodicals, Inc.

  14. Origins Space Telescope: Study Plan

    Science.gov (United States)

    Nayyeri, Hooshang; Cooray, Asantha; Origins Space Telescope Study Team

    2018-01-01

    The Origins Space Telescope (OST) is the mission concept for the Far-Infrared Surveyor, a study in development by NASA in preparation for the 2020 Astronomy and Astrophysics Decadal Survey. Origins is planned to be a large aperture, actively-cooled telescope covering a wide span of the mid- to far-infrared spectrum. Its spectrographs will enable 3D surveys of the sky that will discover and characterize the most distant galaxies, Milky-Way, exoplanets, and the outer reaches of our Solar system. Origins will enable flagship-quality general observing programs led by the astronomical community in the 2030s. The Science and Technology Definition Team (STDT) would like to hear your science needs and ideas for this mission. The team can be contacted at firsurveyor_info@lists.ipac.caltech.edu. This presentation will provide a summary of the OST STDT, the OST Study Team based at NASA Goddard Space Flight Center, study partners, and the advisory panel to the study. This presentation will also summarize recent activities, including the process used to reach a decision on the mission architecture, the identification of key science drivers, and the key study milestones between 2017 and 2020.

  15. Team approach to management of oro.facial cleft among African ...

    African Journals Online (AJOL)

    Background: An interdisciplinary team approach concept has been proposed for management of oro.facial cleft in the last two decades. Our objective was to evaluate the practice of the team approach concept and practices of the specialists involved in oro.facial cleft care in Africa. Materials and Methods: A snapshot survey ...

  16. Whakaora nga moemoea o nga tupuna--living the dreams of the ancestors. Future planning in a Kaupapa Māori CAMHS team.

    Science.gov (United States)

    Elder, Hinemoa; Milne, Moe; Witehira, Heemi; Mendes, Patrick; Heslin, Anneliese; Cribb-Su'a, Ainsleigh; Wilson, Riwai; Goldsmith, Arona; Kainamu, Reena; Barrett, Moana; Love, Shar; Cargo, Tania; Kalra, Vanitha

    2009-08-01

    The aim of this study was to identify and operationalize aspects of a future planning process for sustainable delivery of Kaupapa Māori (Specialist Māori) mental health from a team called He Kakano, within Child and Adolescent Mental Health Services in South Auckland, New Zealand. A 2-day hui (meeting) was held with members of the team and a facilitator, Whaea Moe Milne. Review of background national epidemiological data, local data, information from community, carer and tangata whaiora (consumer) stakeholders and the existing He Kakano Model of Care was undertaken. Use of tikanga (Māori protocol and practices) was evident throughout the hui. A number of aspects of tikanga were identified as essential to the positive outcomes of the future plan. This paper reports one in particular, that of whakatauakī (proverbs where the originator is known). "Whakaora nga moemoea o nga tupuna--living the dreams of the ancestors" is a whakatauakī articulated by Whaea Moe Milne, which was identified as helpful in influencing the strategic planning thinking and decision-making process for He Kakano. This whakatauakī enabled the identification of shared goals, values, beliefs, behaviours and an action plan. The existing and ongoing relationship with Whaea Moe Milne was identified as an important element in the way in which the whakatauakī was received and reflected on. Use of tikanga Māori, in this case, whakatauakī, was helpful in developing future planning for He Kakano. This suggests that use of tikanga may be beneficial in other settings where planning for sustainable Māori responsive services is undertaken. Further work in this area is likely to benefit service development, strategic planning, workforce development and have an impact on improving health outcomes for Māori.

  17. Slovenian spatial planning system: Key changes of past decade

    Directory of Open Access Journals (Sweden)

    Lavrenčić Valentina

    2002-01-01

    Full Text Available Spatial planning has a long tradition in Slovenia. It was always a part of the integrated planning process, first institutionalized in 1968. The planning system was quite unique, combining economic, social, and spatial aspects in one, a so called long-term and medium-term social plan. At the national level its spatial part consisted of the national spatial plan, the defining concept for settlement management and growth, public service delivery, use of space and landscape transformation, protection of the environment, and guidelines for conflict management. Today, this form of planning is substituted by the national strategies and programs of each sector.

  18. Exploring Graduate Students’ Attitudes towards Team Research and Their Scholarly Productivity: A Survey Guided by the Theory of Planned Behavior

    Directory of Open Access Journals (Sweden)

    Tianlan Wei

    2015-01-01

    Full Text Available This study explores the attitudinal and motivational factors underlying graduate students’ attitudes towards team research. Guided by the Theory of Planned Behavior, we hypothesize that attitude, subjective norm, and perceived behavioral control are three major determinants of graduate students’ intentions to conduct team research. An instrument was developed to measure the influences of these factors on students’ intentions and relevant scholarly productivity. A total of 281 graduate students from a large, comprehensive university in the southwest United States participated in the survey. Descriptive statistics reveal that around two-thirds of graduate students have no co-authored manuscripts submitted for publication since they started graduate school. Factor analyses validated the factor structure of the instrument, and the results of Structural Equation Modeling show that (a graduate students’ attitudes towards team research have a positive correlation with their attitudes towards individual research; (b attitude towards team research, subjective norm, and perceived behavioral control, along with students’ discipline/major areas and classification, account for 58% of the variance in the intention to conduct team research; and (c subjective norm appears to be the most influential factor in the model, followed by attitude; while perceived behavioral control is not of much importance. These findings provide implications for academic departments and programs to promote graduate students’ team research. Specifically, creating a climate for collaborative research in academic programs/disciplines/universities may work jointly with enhancing students’ appraisals of such collaborations.

  19. Concept mapping to improve team work, team learning and care of the person with dementia and behavioural and psychological symptoms.

    Science.gov (United States)

    Aberdeen, Suzanne M; Byrne, Graeme

    2018-04-01

    The incidence of behavioural and psychological symptoms of dementia in residential aged care facilities is high. Effective team work and knowledgeable staff are cited as important facilitators of appropriate care responses to clients with these symptoms, but to achieve this within a resource-poor workplace can be challenging. In the study reported in this paper, concept mapping was trialled to enhance multifocal person-centred assessment and care planning as well as team learning. The outcomes of team concept mapping were evaluated using a quasi-experimental design with pre- and post-testing in 11 selected Australian residential aged care facilities , including two control residential aged care facilities , over a nine-month period. It was demonstrated that use of concept mapping improved team function, measured as effectiveness of care planning, as well as enhancing learning, with increased knowledge of dementia care even amongst staff who were not directly involved with the process. It is suggested that these results may be generalizable to other countries and care settings.

  20. Issues for the Traveling Team Physician.

    Science.gov (United States)

    Kaeding, Christopher C; Borchers, James

    2016-07-01

    This article outlines the value of having the team physician traveling with athletes to away venues for competitions or training sessions. At present, this travel presents several issues for the team physician who crosses state lines for taking care of the athletes. In this article, these issues and their possible remedies are discussed. A concern for the travelling team physician is practicing medicine while caring for the team in a state where the physician is not licensed. Another issue can be the transportation of controlled substances in the course of providing optimal care for the team athletes. These two issues are regulatory and legislative issues at both the state and federal levels. On the practical side of being a team physician, the issues of emergency action plans, supplies, and when to transport injured or ill patients are also reviewed. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.

  1. Team Learning Ditinjau dari Team Diversity dan Team Efficacy

    OpenAIRE

    Pohan, Vivi Gusrini Rahmadani; Ancok, Djamaludin

    2010-01-01

    This research attempted to observe team learning from the level of team diversity and team efficacy of work teams. This research used an individual level of analysis rather than the group level. The team members measured the level of team diversity, team efficacy and team learning of the teams through three scales, namely team learning scale, team diversity scale, and team efficacy scale. Respondents in this research were the active team members in a company, PT. Alkindo Mitraraya. The total ...

  2. Team Learning Ditinjau dari Team Diversity dan Team Efficacy

    OpenAIRE

    Vivi Gusrini Rahmadani Pohan; Djamaludin Ancok

    2015-01-01

    This research attempted to observe team learning from the level of team diversity and team efficacy of work teams. This research used an individual level of analysis rather than the group level. The team members measured the level of team diversity, team efficacy and team learning of the teams through three scales, namely team learning scale, team diversity scale, and team efficacy scale. Respondents in this research were the active team members in a company, PT. Alkindo Mitraraya. The total ...

  3. Komplikationer i forbindelse med kejsersnit i elektivt sectio-team

    DEFF Research Database (Denmark)

    Bülow-Lehnsby, Anne Lene; Grønbeck, Lene; Krebs, Lone

    2006-01-01

    INTRODUCTION: Two Danish hospitals have introduced a new organizing structure according to which planned caesarean sections are performed by a team. Caesareans are normally carried out without complications, and this makes it possible to evaluate complications to the surgery isolatedly. The object...... of this article was to describe the medical complications in mother and child of planned caesarean section performed in team. MATERIALS AND METHODS: A total of 534 caesarean sections were performed in team in 2004. Information on complications to caesarean sections was obtained from medical records. RESULTS......: The most frequent complication was blood loss of more than 1000 millilitres occurring in 2,2%. Other complications occurred with frequencies of about or less than 1%. 7% of the patients experienced a complication to caesarean performed in team. Respiratory morbidity occurred in 3.2% of the infants...

  4. Performance expectation plan

    Energy Technology Data Exchange (ETDEWEB)

    Ray, P.E.

    1998-09-04

    This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remediation System (TWRS) Project Hanford Management Contract (PHMC) team. Opportunities for improvement to better meet some performance expectations have been identified. The PHMC has performed at an excellent level in administration of leadership, planning, and technical direction. The contractor has met and made notable improvement of attaining customer satisfaction in mission execution. This document includes the team`s recommendation that the PHMC TWRS Performance Expectation Plan evaluation rating for fiscal year 1998 be an Excellent.

  5. Bechtel Hanford, Inc./ERC team health and safety plan Environmental Restoration Disposal Facility operations

    International Nuclear Information System (INIS)

    Turney, S.R.

    1996-02-01

    A comprehensive safety and health program is essential for reducing work-related injuries and illnesses while maintaining a safe and health work environment. This document establishes Bechtel Hanford, Inc. (BHI)/Environmental Restoration Contractor (ERC) team requirements, policies, and procedures and provides preliminary guidance to the Environmental Restoration Disposal Facility (ERDF) subcontractor for use in preparing essential safety and health documents. This health and safety plan (HASP) defines potential safety and health issues associated with operating and maintaining the ERDF. A site-specific HASP shall be developed by the ERDF subcontractor and shall be implemented before operations and maintenance work can proceed. An activity hazard analysis (AHA) shall also be developed to provide procedures to identify, assess, and control hazards or potential incidents associated with specific operations and maintenance activities

  6. Interdisciplinary collaboration within project-level NEPA teams in the US Forest Service

    Science.gov (United States)

    James W. Freeman; Marc J. Stern; Michael Mortimer; Dale J. Blahna; Lee K. Cerveny

    2011-01-01

    Interdisciplinary teamwork has become a foundation of natural resources planning and management in the US. Yet, we know little about the degree of interdisciplinary collaboration of natural resource planning teams. We conducted 10 case studies of Forest Service NEPA (National Environmental Policy Act) teams working on projects related to the 2005 Travel Management Rule...

  7. Decadal climate prediction (project GCEP).

    Science.gov (United States)

    Haines, Keith; Hermanson, Leon; Liu, Chunlei; Putt, Debbie; Sutton, Rowan; Iwi, Alan; Smith, Doug

    2009-03-13

    Decadal prediction uses climate models forced by changing greenhouse gases, as in the International Panel for Climate Change, but unlike longer range predictions they also require initialization with observations of the current climate. In particular, the upper-ocean heat content and circulation have a critical influence. Decadal prediction is still in its infancy and there is an urgent need to understand the important processes that determine predictability on these timescales. We have taken the first Hadley Centre Decadal Prediction System (DePreSys) and implemented it on several NERC institute compute clusters in order to study a wider range of initial condition impacts on decadal forecasting, eventually including the state of the land and cryosphere. The eScience methods are used to manage submission and output from the many ensemble model runs required to assess predictive skill. Early results suggest initial condition skill may extend for several years, even over land areas, but this depends sensitively on the definition used to measure skill, and alternatives are presented. The Grid for Coupled Ensemble Prediction (GCEP) system will allow the UK academic community to contribute to international experiments being planned to explore decadal climate predictability.

  8. The Evolving Treatment Patterns of NCAA Division I Football Players by Orthopaedic Team Physicians Over the Past Decade, 2008-2016.

    Science.gov (United States)

    Carver, Trevor J; Schrock, John B; Kraeutler, Matthew J; McCarty, Eric C

    Previous studies have analyzed the treatment patterns used to manage injuries in National Collegiate Athletic Association (NCAA) Division I football players. Treatment patterns used to manage injuries in NCAA Division I football players will have changed over the study period. Descriptive epidemiology study. Level 5. The head orthopaedic team physicians for all 128 NCAA Division I football teams were asked to complete a survey containing questions regarding experience as team physician, medical coverage of the team, reimbursement issues, and treatment preferences for some of the most common injuries occurring in football players. Responses from the current survey were compared with responses from the same survey sent to NCAA Division I team physicians in 2008. Responses were received from 111 (111/119, 93%) NCAA Division I orthopaedic team physicians in 2008 and 115 (115/128, 90%) orthopaedic team physicians between April 2016 and April 2017. The proportion of team physicians who prefer a patellar tendon autograft for primary anterior cruciate ligament reconstruction (ACLR) increased from 67% in 2008 to 83% in 2016 ( P football players over the study period. In particular, physicians have changed their preferred techniques for ACLR, anterior shoulder stabilization, and PCL reconstruction. Physicians have also become more conservative with pregame Toradol injections. These opinions may help guide treatment decisions and lead to better care of all athletes.

  9. Asteroid team

    International Nuclear Information System (INIS)

    Matson, D.L.

    1988-01-01

    The purpose of this task is to support asteroid research and the operation of an Asteroid Team within the Earth and Space Sciences Division at the Jet Propulsion Laboratory (JPL). The Asteroid Team carries out original research on asteroids in order to discover, better characterize and define asteroid properties. This information is needed for the planning and design of NASA asteroid flyby and rendezvous missions. The asteroid Team also provides scientific and technical advice to NASA and JPL on asteroid related programs. Work on asteroid classification continued and the discovery of two Earth-approaching M asteroids was published. In the asteroid photometry program researchers obtained N or Q photometry for more than 50 asteroids, including the two M-earth-crossers. Compositional analysis of infrared spectra (0.8 to 2.6 micrometer) of asteroids is continuing. Over the next year the work on asteroid classification and composition will continue with the analysis of the 60 reduced infrared spectra which we now have at hand. The radiometry program will continue with the reduction of the N and Q bandpass data for the 57 asteroids in order to obtain albedos and diameters. This year the emphasis will shift to IRAS follow-up observations; which includes objects not observed by IRAS and objects with poor or peculiar IRAS data. As in previous year, we plan to give top priority to any opportunities for observing near-Earth asteroids and the support (through radiometric lightcurve observations from the IRTF) of any stellar occultations by asteroids for which occultation observation expeditions are fielded. Support of preparing of IRAS data for publication and of D. Matson for his participation in the NASA Planetary Astronomy Management and Operations Working Group will continue

  10. Asteroid team

    Science.gov (United States)

    Matson, D. L.

    1988-01-01

    The purpose of this task is to support asteroid research and the operation of an Asteroid Team within the Earth and Space Sciences Division at the Jet Propulsion Laboratory (JPL). The Asteroid Team carries out original research on asteroids in order to discover, better characterize and define asteroid properties. This information is needed for the planning and design of NASA asteroid flyby and rendezvous missions. The asteroid Team also provides scientific and technical advice to NASA and JPL on asteroid related programs. Work on asteroid classification continued and the discovery of two Earth-approaching M asteroids was published. In the asteroid photometry program researchers obtained N or Q photometry for more than 50 asteroids, including the two M-earth-crossers. Compositional analysis of infrared spectra (0.8 to 2.6 micrometer) of asteroids is continuing. Over the next year the work on asteroid classification and composition will continue with the analysis of the 60 reduced infrared spectra which we now have at hand. The radiometry program will continue with the reduction of the N and Q bandpass data for the 57 asteroids in order to obtain albedos and diameters. This year the emphasis will shift to IRAS follow-up observations; which includes objects not observed by IRAS and objects with poor or peculiar IRAS data. As in previous year, we plan to give top priority to any opportunities for observing near-Earth asteroids and the support (through radiometric lightcurve observations from the IRTF) of any stellar occultations by asteroids for which occultation observation expeditions are fielded. Support of preparing of IRAS data for publication and of D. Matson for his participation in the NASA Planetary Astronomy Management and Operations Working Group will continue.

  11. The Automated Assembly Team contributions to the APRIMED Agile Manufacturing Project

    International Nuclear Information System (INIS)

    Jones, R.E.; Ames, A.L.; Calton, T.L.

    1995-06-01

    The Automated Assembly Team of the APRIMED Project (abbreviated as A') consists of two parts: the Archimedes Project, which is an ongoing project developing automated assembly technology, and the A' Robot Team. Archimedes is a second generation assembly planning system that both provides a general high-level assembly sequencing capability and, for a smaller class of products, facilitates automatic programming of a robotic workcell to assemble them. The A' robot team designed, developed, and implemented a flexible robot workcell which served as the automated factory of the A' project. In this document we briefly describe the role of automated assembly planning in agile manufacturing, and specifically describe the contributions of the Archimedes project and the A' robot team to the A' project. We introduce the concepts of the Archimedes automated assembly planning project, and discuss the enhancements to Archimedes which were developed in response to the needs of the A' project. We also present the work of the A' robot team in designing and developing the A' robot workcell, including all tooling and programming to support assembly of the A' discriminator devices. Finally, we discuss the process changes which these technologies have enabled in the A' project

  12. Planning a pharmacy-led medical mission trip, part 2: servant leadership and team dynamics.

    Science.gov (United States)

    Brown, Dana A; Brown, Daniel L; Yocum, Christine K

    2012-06-01

    While pharmacy curricula can prepare students for the cognitive domains of pharmacy practice, mastery of the affective aspects can prove to be more challenging. At the Gregory School of Pharmacy, medical mission trips have been highly effective means of impacting student attitudes and beliefs. Specifically, these trips have led to transformational changes in student leadership capacity, turning an act of service into an act of influence. Additionally, building team unity is invaluable to the overall effectiveness of the trip. Pre-trip preparation for teams includes activities such as routine team meetings, team-building activities, and implementation of committees, as a means of promoting positive team dynamics. While in the field, team dynamics can be fostered through activities such as daily debriefing sessions, team disclosure times, and provision of medical services.

  13. Care planning for pressure ulcers in hospice: the team effect.

    Science.gov (United States)

    Eisenberger, Andrew; Zeleznik, Jomarie

    2004-09-01

    The standards of care for patients at risk for or with a pressure ulcer in hospitals and nursing homes focus on prevention and ulcer healing using an interdisciplinary approach. Although not a primary hospice condition, pressure ulcers are not uncommon in dying patients. Their management in hospices, particularly the involvement of family caregivers, has not been studied. The objective of this study is to identify the factors that influence care planning for the prevention and treatment of pressure ulcers in hospice patients and develop a taxonomy to use for further study. A telephone survey was conducted with 18 hospice directors of clinical services and 10 direct-care nurses. Descriptive qualitative data analysis using grounded theory was utilized. The following three themes were identified: (1) the primary role of the hospice nurse is an educator rather than a wound care provider; (2) hospice providers perceive the barriers and burdens of family caregiver involvement in pressure ulcer care to be bodily location of the pressure ulcer, unpleasant wound characteristics, fear of causing pain, guilt, and having to acknowledge the dying process when a new pressure ulcer develops; and (3) the "team effect" describes the collaboration between family caregivers and the health care providers to establish individualized achievable goals of care ranging from pressure ulcer prevention to acceptance of a pressure ulcer and symptom palliation. Pressure ulcer care planning is a model of collaborative decision making between family caregivers and hospice providers for a condition that occurs as a secondary condition in hospice. A pressure ulcer places significant burdens on family caregivers distinct from common end-of-life symptoms whose treatment is directed at the patient. Because the goals of pressure ulcer care appear to be individualized for a dying patient and their caregivers, the basis of quality-of-care evaluations should be the process of care rather than the outcome

  14. Emergency response planning in Pennsylvania

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1988-01-01

    In the decade since the accident at Three Mile Island, emergency planning for response to these events has undergone a significant change in Pennsylvania, as elsewhere. Changes respond to federal guidance and to state agency initiatives. The most singular change is the practice of implementing a protective action throughout the entire emergency planning zone (EPZ). Due to Pennsylvania agency experiences during the accident, the decision was made soon after to develop a staff of nuclear engineers, each giving special day-to-day attention to a specific nuclear power station in the state. Changes in communications capabilities are significant, these being dedicated phone lines between the Commonwealth and each power station, and the reorientation of the Department of Environmental Resources radio network to accommodate direction of field monitoring teams from Harrisburg. Changes that are being or will be implemented in the near future include assessing the emergency response data system for electronic delivery of plant parameter data form facilities during accidents, increased participation in exercises, emergency medical planning, and training, the inclusion of all 67 counties in Pennsylvania in an ingestion EPZ, and the gradual severance of dependence on land-line emergency communication systems

  15. The effects of physical threat on team processes during complex task performance

    NARCIS (Netherlands)

    Kamphuis, W.; Gaillard, A.W.K.; Vogelaar, A.L.W.

    2011-01-01

    Teams have become the norm for operating in dangerous and complex situations. To investigate how physical threat affects team performance, 27 threeperson teams engaged in a complex planning and problem-solving task, either under physical threat or under normal conditions. Threat consisted of the

  16. Body Percussion and Team Building through the BAPNE Method

    Directory of Open Access Journals (Sweden)

    Romero-Naranjo A.A.

    2016-01-01

    Full Text Available BAPNE Method is a method based on cognitive stimulation integrating music and movement through body percussion. The aim of this research is to explore its whole potential as a tool to build teams. Team building is a philosophy for work design, and since over two decades ago, it defends that obtaining a high performance and organizing efficiency is more useful to perceive employees as interdependent members in a team of work than individuals ones. From this viewpoint, this research advocates that BAPNE Method’s body percussion practice will have an impact on this vision of team work directly. For its own characteristics, body percussion stimulates ways of contact in movement, which ease social ties and, especially, promote group cohesion. Through social, body and, affective dimension; BAPNE Method is capable of developing a shared vision and a single aim, to stimulate team work identity and an atmosphere of trust; and finally, to improve individual communication and satisfaction levels in group tasks.

  17. The Development and Empirical Validation of a Multidimensional Measurement Instrument for Team Learning Behaviors

    NARCIS (Netherlands)

    Savelsbergh, Chantal M.J.H.; van der Heijden, Beatrice; Poell, Rob F.

    2009-01-01

    The importance of teamwork to organizational success in today’s economy has been emphasized in literature for well over a decade. Effective teamwork can only be sustained, however, if it is supported by a process of team learning. Following Edmondson, the authors regard team learning as a group

  18. Improving Team Performance: Proceedings of the Rand Team Performance Workshop.

    Science.gov (United States)

    1980-08-01

    Gene Gloye of ONR said at that time that by highlighting specific content areas for attention, one runs the risk of supporting "research by the yard...Meister The purpose of this paper is to describe how human factors engineering ( HFE ) relates to team performance. HFE is the application of...behavioral principles and data to the design and development of man-machine systems (MMS). HFE activities begin in the very early planning stages of MMS

  19. Study on team evaluation. Team process model for team evaluation

    International Nuclear Information System (INIS)

    Sasou Kunihide; Ebisu, Mitsuhiro; Hirose, Ayako

    2004-01-01

    Several studies have been done to evaluate or improve team performance in nuclear and aviation industries. Crew resource management is the typical example. In addition, team evaluation recently gathers interests in other teams of lawyers, medical staff, accountants, psychiatrics, executive, etc. However, the most evaluation methods focus on the results of team behavior that can be observed through training or actual business situations. What is expected team is not only resolving problems but also training younger members being destined to lead the next generation. Therefore, the authors set the final goal of this study establishing a series of methods to evaluate and improve teams inclusively such as decision making, motivation, staffing, etc. As the first step, this study develops team process model describing viewpoints for the evaluation. The team process is defined as some kinds of power that activate or inactivate competency of individuals that is the components of team's competency. To find the team process, the authors discussed the merits of team behavior with the experienced training instructors and shift supervisors of nuclear/thermal power plants. The discussion finds four team merits and many components to realize those team merits. Classifying those components into eight groups of team processes such as 'Orientation', 'Decision Making', 'Power and Responsibility', 'Workload Management', 'Professional Trust', 'Motivation', 'Training' and 'staffing', the authors propose Team Process Model with two to four sub processes in each team process. In the future, the authors will develop methods to evaluate some of the team processes for nuclear/thermal power plant operation teams. (author)

  20. Are real teams healthy teams?

    NARCIS (Netherlands)

    Buljac, M.; van Woerkom, M.; van Wijngaarden, P.

    2013-01-01

    This study examines the impact of real-team--as opposed to a team in name only--characteristics (i.e., team boundaries, stability of membership, and task interdependence) on team processes (i.e., team learning and emotional support) and team effectiveness in the long-term care sector. We employed a

  1. Team Learning in Teacher Teams: Team Entitativity as a Bridge between Teams-in-Theory and Teams-in-Practice

    Science.gov (United States)

    Vangrieken, Katrien; Dochy, Filip; Raes, Elisabeth

    2016-01-01

    This study aimed to investigate team learning in the context of teacher teams in higher vocational education. As teacher teams often do not meet all criteria included in theoretical team definitions, the construct "team entitativity" was introduced. Defined as the degree to which a group of individuals possesses the quality of being a…

  2. A Decade of Comparative Dose Planning Studies for Early-Stage Hodgkin Lymphoma: What Can We Learn?

    Energy Technology Data Exchange (ETDEWEB)

    Maraldo, Maja V., E-mail: dra.maraldo@gmail.com [Department of Oncology, Section of Radiotherapy, Rigshospitalet, University of Copenhagen, Copenhagen (Denmark); Specht, Lena [Department of Oncology, Section of Radiotherapy, Rigshospitalet, University of Copenhagen, Copenhagen (Denmark); Department of Hematology, Rigshospitalet, University of Copenhagen, Copenhagen (Denmark)

    2014-12-01

    During the past 4 decades, the treatment of Hodgkin lymphoma has changed dramatically, and combined modality treatment is now considered the standard of care for patients with early-stage disease. However, the risk of late effects has led to concerns regarding the use of radiation therapy, especially in young patients with a long life expectancy. In this study, we review the current evidence for modern radiation therapy planning and delivery techniques in the treatment of early-stage Hodgkin lymphoma with a focus on a reduced delivered dose, a reduced irradiated volume, and a more conformal dose distribution. Although studies are difficult to compare because of differences in field technique, prescribed dose, target volumes, patient population, and reported dosimetric and plan evaluation parameters, modern radiation therapy significantly reduces exposure to normal tissues and thereby the estimated risk of late effects. However, there is no such thing as a single best modern delivery technique when multiple organs at risk are considered simultaneously because of the heterogeneity in patient anatomy and disease location, and the choice of radiation therapy technique should be made individually for each patient.

  3. Team Leader Structuring for Team Effectiveness and Team Learning in Command-and-Control Teams.

    Science.gov (United States)

    van der Haar, Selma; Koeslag-Kreunen, Mieke; Euwe, Eline; Segers, Mien

    2017-04-01

    Due to their crucial and highly consequential task, it is of utmost importance to understand the levers leading to effectiveness of multidisciplinary emergency management command-and-control (EMCC) teams. We argue that the formal EMCC team leader needs to initiate structure in the team meetings to support organizing the work as well as facilitate team learning, especially the team learning process of constructive conflict. In a sample of 17 EMCC teams performing a realistic EMCC exercise, including one or two team meetings (28 in sum), we coded the team leader's verbal structuring behaviors (1,704 events), rated constructive conflict by external experts, and rated team effectiveness by field experts. Results show that leaders of effective teams use structuring behaviors more often (except asking procedural questions) but decreasingly over time. They support constructive conflict by clarifying and by making summaries that conclude in a command or decision in a decreasing frequency over time.

  4. Team Leader Structuring for Team Effectiveness and Team Learning in Command-and-Control Teams

    Science.gov (United States)

    van der Haar, Selma; Koeslag-Kreunen, Mieke; Euwe, Eline; Segers, Mien

    2017-01-01

    Due to their crucial and highly consequential task, it is of utmost importance to understand the levers leading to effectiveness of multidisciplinary emergency management command-and-control (EMCC) teams. We argue that the formal EMCC team leader needs to initiate structure in the team meetings to support organizing the work as well as facilitate team learning, especially the team learning process of constructive conflict. In a sample of 17 EMCC teams performing a realistic EMCC exercise, including one or two team meetings (28 in sum), we coded the team leader’s verbal structuring behaviors (1,704 events), rated constructive conflict by external experts, and rated team effectiveness by field experts. Results show that leaders of effective teams use structuring behaviors more often (except asking procedural questions) but decreasingly over time. They support constructive conflict by clarifying and by making summaries that conclude in a command or decision in a decreasing frequency over time. PMID:28490856

  5. Fleet Assistance and Support Team (FAST) Lab

    Data.gov (United States)

    Federal Laboratory Consortium — The FAST team was established by PMA-264 for introduction of multistatic ASW systems into the Fleet.FAST provides Air ASW mission planning, tactics/tactical sensor...

  6. Strategic planning--a plan for excellence for South Haven Health System.

    Science.gov (United States)

    Urbanski, Joanne; Baskel, Maureen; Martelli, Mary

    2011-01-01

    South Haven Health System has developed an innovative approach to strategic planning. The key to success of this process has been the multidisciplinary involvement of all stakeholders from the first planning session through the final formation of a strategic plan with measurable objectives for each goal. The process utilizes a Conversation Café method for identifying opportunities and establishing goals, Strategic Oversight Teams to address each goal and a Champion for implementation of each objective. Progress is measured quarterly by Strategic Oversight Team report cards. Transparency of communication within the organization and the sharing of information move the plan forward. The feedback from participant evaluations has been overwhelmingly positive. They are involved and excited.

  7. A Decade Lost: Primary Healthcare Performance Reporting across Canada under the Action Plan for Health System Renewal.

    Science.gov (United States)

    Johnston, Sharon; Hogel, Matthew

    2016-05-01

    In 2004, Canada's First Ministers committed to reforms that would shape the future of the Canadian healthcare landscape. These agreements included commitments to improved performance reporting within the primary healthcare system. The aim of this paper was to review the state of primary healthcare performance reporting after the public reporting mandate agreed to a decade ago in the Action Plan for Health System Renewal of 2003 expired. A grey literature search was performed to identify reports released by the governmental and independent reporting bodies across Canada. No province, or the federal government, met their performance reporting obligations from the 2004 accords. Although the indicators required to report on in the 2004 Accord no longer reflect the priorities of patients, policy makers and physicians, provinces are also failing to report on these priorities. Canada needs better primary healthcare performance reporting to enable accountability and improvement within and across provinces. Despite the national mandate to improve public health system reporting, an opportunity to learn from the diverse primary healthcare reforms, underway across Canada for the past decade, has already been lost. Copyright © 2016 Longwoods Publishing.

  8. Mobile Robotic Teams Applied to Precision Agriculture

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Matthew Oley; Kinoshita, Robert Arthur; Mckay, Mark D; Willis, Walter David; Gunderson, R.W.; Flann, N.S.

    1999-04-01

    The Idaho National Engineering and Environmental Laboratory (INEEL) and Utah State University’s Center for Self-Organizing and Intelligent Systems (CSOIS) have developed a team of autonomous robotic vehicles applicable to precision agriculture. A unique technique has been developed to plan, coordinate, and optimize missions in large structured environments for these autonomous vehicles in realtime. Two generic tasks are supported: 1) Driving to a precise location, and 2) Sweeping an area while activating on-board equipment. Sensor data and task achievement data is shared among the vehicles enabling them to cooperatively adapt to changing environmental, vehicle, and task conditions. This paper discusses the development of the autonomous robotic team, details of the mission-planning algorithm, and successful field demonstrations at the INEEL.

  9. Mobile Robotic Teams Applied to Precision Agriculture

    Energy Technology Data Exchange (ETDEWEB)

    M.D. McKay; M.O. Anderson; N.S. Flann (Utah State University); R.A. Kinoshita; R.W. Gunderson; W.D. Willis (INEEL)

    1999-04-01

    The Idaho National Engineering and Environmental Laboratory (INEEL) and Utah State University�s Center for Self-Organizing and Intelligent Systems (CSOIS) have developed a team of autonomous robotic vehicles applicable to precision agriculture. A unique technique has been developed to plan, coordinate, and optimize missions in large structured environments for these autonomous vehicles in real-time. Two generic tasks are supported: 1) Driving to a precise location, and 2) Sweeping an area while activating on-board equipment. Sensor data and task achievement data is shared among the vehicles enabling them to cooperatively adapt to changing environmental, vehicle, and task conditions. This paper discusses the development of the autonomous robotic team, details of the mission-planning algorithm, and successful field demonstrations at the INEEL.

  10. Canada’s Tax Competitiveness After a Decade of Reforms: Still an Unfinished Plan

    Directory of Open Access Journals (Sweden)

    Duanjie Chen

    2010-05-01

    Full Text Available In the past decade, Canada has undertaken extensive business tax reform, with sharply lower corporate income tax rates, better capital cost allowances, sales tax harmonization, and the virtual elimination of capital tax on non-financial businesses. Further changes are in store by 2012 that will put Canada in the middle of the pack of a broad group of 80 countries. Over the past several years, however, Canada has lost some standing. In 2005, it was the fourth-highest-taxed country, and by 2007 it had improved to thirteenth highest; by 2009, though, it had worsened to tenth highest. Still, in that year, taking into account the reforms that had taken place, Canada’s business tax structure was better than that of the United States. Canada’s tax competitiveness among the Group-of-7 major industrialized countries has also improved, but still lags that of most other members of the Organisation for Economic Cooperation and Development (OECD. Additional reductions of business taxes by 2013 — particularly sales tax harmonization in Ontario and British Columbia and planned federal and provincial corporate tax rate reductions — will further improve Canada’s business tax competitiveness, crucially with respect to the emerging economies of Brazil, Russia, India, and China. Yet federal opposition parties are urging an end to further planned reductions of federal and provincial corporate income tax rates. Such a move would be seriously misguided. Not only would it put Canada’s tax competitiveness at a disadvantage among OECD countries, impairing productivity; it would also harm government revenues as businesses shifted their profits out of high-tax jurisdictions and into lower-tax one abroad.

  11. Using Rituals to Strengthen Your Medical Practice Team.

    Science.gov (United States)

    Hills, Laura

    2015-01-01

    Rituals can cement the identity of and strengthen the bonds between any people, including the members of the medical practice team. This article presents the idea that the medical practice manager is in the ideal position to create and use rituals for team building. It defines the term ritual, and explores how rituals differ from customs or traditions. As well, it describes six benefits of rituals and the hallmarks of the most effective team rituals; describes seven creative and interesting corporate rituals that medical practice managers can study for inspiration; suggests 20 excellent opportunities within the medical practice calendar year for medical practice team rituals; and identifies six kinds of rituals that are used in organizations. Finally, this article provides a four-step action plan for ritualizing your medical practice team's morning huddles.

  12. Emergency department case management: the dyad team of nurse case manager and social worker improve discharge planning and patient and staff satisfaction while decreasing inappropriate admissions and costs: a literature review.

    Science.gov (United States)

    Bristow, Darlene P; Herrick, Charlotte A

    2002-01-01

    A model of emergency department (ED) case management consisting of a social worker and a nurse case manager can prevent inappropriate admissions, improve discharge planning, decrease cost, and enhance patient satisfaction. The individual and combined roles of the dyad team of social worker and nurse case manager are discussed. A literature review includes how a case management dyad team of social worker and nurse case manager in the ED can decrease utilization of the ED for nonemergent visits, promote the use of community resources, and improve discharge planning to avoid excessive costs. The importance of the dyad team working with the interdisciplinary team in the ED, the primary care physician (PCP), and other community health care providers in order to provide a holistic approach to care is addressed. A discussion about the improvement of both patient and staff satisfaction demonstrates the results of case management strategies that support and advocate for patients to receive quality, cost-effective care across the health care continuum, while decreasing the use of the ED for nonemergent care.

  13. Strategic urban planning. Industrial area development in The Netherlands, to direct or to interact?

    NARCIS (Netherlands)

    de Graaf, Robin S.

    2005-01-01

    The first element in this research question is 'interaction'. It addresses the interaction in the planning process between the planning team stakeholders and between the planning team and non-planning team stakeholders.

  14. Planetary Data Archiving Plan at JAXA

    Science.gov (United States)

    Shinohara, Iku; Kasaba, Yasumasa; Yamamoto, Yukio; Abe, Masanao; Okada, Tatsuaki; Imamura, Takeshi; Sobue, Shinichi; Takashima, Takeshi; Terazono, Jun-Ya

    After the successful rendezvous of Hayabusa with the small-body planet Itokawa, and the successful launch of Kaguya to the moon, Japanese planetary community has gotten their own and full-scale data. However, at this moment, these datasets are only available from the data sites managed by each mission team. The databases are individually constructed in the different formats, and the user interface of these data sites is not compatible with foreign databases. To improve the usability of the planetary archives at JAXA and to enable the international data exchange smooth, we are investigating to make a new planetary database. Within a coming decade, Japan will have fruitful datasets in the planetary science field, Venus (Planet-C), Mercury (BepiColombo), and several missions in planning phase (small-bodies). In order to strongly assist the international scientific collaboration using these mission archive data, the planned planetary data archive at JAXA should be managed in an unified manner and the database should be constructed in the international planetary database standard style. In this presentation, we will show the current status and future plans of the planetary data archiving at JAXA.

  15. Planning ahead: Improving escalation plans before the weekend.

    Science.gov (United States)

    Zarkali, Angeliki; Black, Duncan; Smee, Elizabeth; Deshraj, Anshul; Smallwood, Nicholas

    2014-01-01

    Handover is the system by which responsibility for patient care is transferred between healthcare professionals. A significant aspect of handover is the existence of an escalation plan for each patient in case of deterioration over the weekend. According to the Royal College of Physicians, all patients should have a clear escalation plan documented in the notes before a weekend, since parent medical teams (Consultant team in charge of care) are best placed to make these decisions. If left to on-call teams, at a time of deterioration over a weekend, they might not have all available information, the patient might be unable to be involved in the decisions, and the family might not be consulted. With this is mind, we decided to analyse the existing handover process in a medium sized district general hospital, with the aim of improving the process and the documentation of escalation plans. The results from our retrospective analysis of the system in place revealed a significant lack of documentation of escalation plans in the medical notes. Three sample wards were selected to analyse the current handover system and test proposed measures before hospital-wide implementation. After trialling of a physical handover meeting in addition to the existing intranet system and a proforma for the Friday ward round, the documentation of escalation plans in the patients' notes improved from 9.1% to 41.1%. Based on these results, as well as formal feedback from junior doctors and informal feedback from other staff, the physical handover meeting and Friday ward round proforma will be implemented throughout the Trust. Our interventions led to an improvement in the documentation of escalation plans in our hospital, thus saving precious time in the event of a patient's deterioration. This also ensures that families and patients are involved in the decision making process and kept informed, and reduces the burden for the weekend on-call teams.

  16. The Implementation of an Interdisciplinary Co-planning Team Model Among Mathematics and Science Teachers

    Science.gov (United States)

    Brown, Michelle Cetner

    In recent years, Science, Technology, Engineering, and Mathematics (STEM) education has become a significant focus of numerous theoretical and commentary articles as researchers have advocated for active and conceptually integrated learning in classrooms. Drawing connections between previously isolated subjects, especially mathematics and science, has been shown to increase student engagement, performance, and critical thinking skills. However, obstacles exist to the widespread implementation of integrated curricula in schools, such as teacher knowledge and school structure and culture. The Interdisciplinary Co-planning Team (ICT) model, in which teachers of different subjects come together regularly to discuss connections between content and to plan larger interdisciplinary activities and smaller examples and discussion points, offers a method for teachers to create sustainable interdisciplinary experiences for students within the bounds of the current school structure. The ICT model is designed to be an iterative, flexible model, providing teachers with both a regular time to come together as "experts" and "teach" each other important concepts from their separate disciplines, and then to bring their shared knowledge and language back to their own classrooms to implement with their students in ways that fit their individual classes. In this multiple-case study, which aims to describe the nature of the co-planning process, the nature of plans, and changes in teacher beliefs as a result of co-planning, three pairs of secondary mathematics and science teachers participated in a 10-week intervention with the ICT model. Each pair constituted one case. Data included observations, interviews, and artifact collection. All interviews, whole-group sessions, and co-planning sessions were transcribed and coded using both theory-based and data-based codes. Finally, a cross-case comparison was used to present similarities and differences across cases. Findings suggest that the

  17. Translator Plan: A Coordinated Vision for Fiscal Years 2018-2020

    Energy Technology Data Exchange (ETDEWEB)

    Riihimaki, Laura [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Comstock, Jennifer [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Collis, Scott [Argonne National Lab. (ANL), Argonne, IL (United States); Flynn, Connor [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Giangrande, Scott [Brookhaven National Lab. (BNL), Upton, NY (United States); Monroe, Justin [University of Oklahoma; Sivaraman, Chitra [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Xie, Shaocheng [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2018-01-30

    In June of 2017, the Translator Group met to develop this coordinated three-year vision plan, incorporating key feedback and aligning to ARM’s mission priorities. This plan responds to a shift in how we determine our priorities, given the new needs of the ARM Facility. In the past, individual Translators have determined priorities in conversation with individual DOE Atmospheric System Research (ASR) working groups. To better support ARM’s Decadal Vision (https://www.arm.gov/publications/programdocs/doe-sc-arm-14-029.pdf), however, the Translator Group is instead developing a coordinated response to needs from our user community to better balance resources and skills among participants. This approach agrees with direction from ARM leadership and the ARM-ASR Coordination Team (AACT). To develop this plan the Translator Group reviewed feedback received from the User Executive Committee (UEC) and the Triennial Review, as well as priorities from ASR working groups and Principal Investigators (PIs), the LES ARM Symbiotic Simulation and Observation (LASSO) project, and new instrumentation and activities as described by the ARM Technical Director. In particular, we are responding to the advice that we were trying to do too much, and should focus on providing additional support to data quality, uncertainty assessment, a timeline for producing core VAPs from ARM Mobile Facility (AMF) campaigns, and supporting key aspects of the Decadal Vision.

  18. IMPERA: Integrated Mission Planning for Multi-Robot Systems

    Directory of Open Access Journals (Sweden)

    Daniel Saur

    2015-10-01

    Full Text Available This paper presents the results of the project IMPERA (Integrated Mission Planning for Distributed Robot Systems. The goal of IMPERA was to realize an extraterrestrial exploration scenario using a heterogeneous multi-robot system. The main challenge was the development of a multi-robot planning and plan execution architecture. The robot team consists of three heterogeneous robots, which have to explore an unknown environment and collect lunar drill samples. The team activities are described using the language ALICA (A Language for Interactive Agents. Furthermore, we use the mission planning system pRoPhEt MAS (Reactive Planning Engine for Multi-Agent Systems to provide an intuitive interface to generate team activities. Therefore, we define the basic skills of our team with ALICA and define the desired goal states by using a logic description. Based on the skills, pRoPhEt MAS creates a valid ALICA plan, which will be executed by the team. The paper describes the basic components for communication, coordinated exploration, perception and object transportation. Finally, we evaluate the planning engine pRoPhEt MAS in the IMPERA scenario. In addition, we present further evaluation of pRoPhEt MAS in more dynamic environments.

  19. [Practical aspects of implementation quality management system ISO 9001:2000 by hospital infection control team].

    Science.gov (United States)

    Kuziemski, Arkadiusz; Czerniak, Beata; Frankowska, Krystyna; Gonia, Ewa; Salińska, Teresa; Motuk, Andrzej; Sobociński, Zbigniew

    2009-01-01

    In 2006 the Board of the Jan Biziel Hospital in Bydgoszcz decided to include procedures of health services in the implementation process within the confines of ISO 9001:2000 certification. The hospital infection control team that has operated in the hospital since 1989 performed the analysis of the forms of activities to date and on that basis the team prepared original plan of quality management. In April 2007, this plan was successfully accepted by the certifying team. The aim of this study is to present the aforementioned plan which is the result of 18 years experience of the team. At the same time, I hope that this study will be very helpful for all professionals interested in hospital epidemiology, especially in the context of implementing quality management systems.

  20. Imagery Integration Team

    Science.gov (United States)

    Calhoun, Tracy; Melendrez, Dave

    2014-01-01

    -of-a-kind imagery assets and skill sets, such as ground-based fixed and tracking cameras, crew-in the-loop imaging applications, and the integration of custom or commercial-off-the-shelf sensors onboard spacecraft. For spaceflight applications, the Integration 2 Team leverages modeling, analytical, and scientific resources along with decades of experience and lessons learned to assist the customer in optimizing engineering imagery acquisition and management schemes for any phase of flight - launch, ascent, on-orbit, descent, and landing. The Integration 2 Team guides the customer in using NASA's world-class imagery analysis teams, which specialize in overcoming inherent challenges associated with spaceflight imagery sets. Precision motion tracking, two-dimensional (2D) and three-dimensional (3D) photogrammetry, image stabilization, 3D modeling of imagery data, lighting assessment, and vehicle fiducial marking assessments are available. During a mission or test, the Integration 2 Team provides oversight of imagery operations to verify fulfillment of imagery requirements. The team oversees the collection, screening, and analysis of imagery to build a set of imagery findings. It integrates and corroborates the imagery findings with other mission data sets, generating executive summaries to support time-critical mission decisions.

  1. Elektivt sectio-team--en organisatorisk nyskabelse

    DEFF Research Database (Denmark)

    Bülow-Lehnsby, Anne Lene; Grønbeck, Lene; Krebs, Lone

    2006-01-01

    INTRODUCTION: The increasing rate of delivery by caesarean section demands more effective use of resources in obstetrical departments and anaesthesiological departments. At the Danish State Hospital, Rigshospitalet, in 2002, we decided to optimise the cooperation between the various professionals...... involved, by softening the professional boundaries, and by performing most planned caesarean sections on the same day, carried out by the same team, the "elective caesarean section team" (EST). In 2003 a similar structure was established at Hvidovre Hospital. This paper describes the process...... of establishing EST, the organisational implications, and the results of an evaluation of EST by the users. MATERIALS AND METHODS: The case records of all caesarean sections performed by the EST-team at Rigshospitalet and Hvidovre Hospital in 2004, were examined. All users in a two-month period evaluated the EST...

  2. Achieving performance breakthroughs in an HMO business process through quality planning.

    Science.gov (United States)

    Hanan, K B

    1993-01-01

    Kaiser Permanente's Georgia Region commissioned a quality planning team to design a new process to improve payments to its suppliers and vendors. The result of the team's effort was a 73 percent reduction in cycle time. This team's experiences point to the advantages of process redesign as a quality planning model, as well as some general guidelines for its most effective use in teams. If quality planning project teams are carefully configured, sufficiently expert in the existing process, and properly supported by management, organizations can achieve potentially dramatic improvements in process performance using this approach.

  3. 'Plans are useless'.

    Science.gov (United States)

    Bland, Michael

    2013-01-01

    An essential element in crisis recovery is the protection and/or recovery of reputation. This calls for a crisis communications function that is of more than passing interest to the business continuity specialist and which presents two major challenges in this era of process-driven management: (1) it is an inexact science, more about common sense, psychology, empathy and 'playing it by ear' than about box ticking; (2) it does not lend itself to detailed, rigid plans, although some degree of planning is essential. This paper outlines a flexible approach that will help the crisis team to develop a workable communications plan that strikes a balance between being too detailed and too sketchy. It argues that the whole management team should be involved in developing the plan and sets a number of questions, which, on being answered, will help a realistic, achievable and effective plan to evolve.

  4. Team behaviour analysis in sports using the poisson equation

    OpenAIRE

    Direkoglu, Cem; O'Connor, Noel E.

    2012-01-01

    We propose a novel physics-based model for analysing team play- ers’ positions and movements on a sports playing field. The goal is to detect for each frame the region with the highest population of a given team’s players and the region towards which the team is moving as they press for territorial advancement, termed the region of intent. Given the positions of team players from a plan view of the playing field at any given time, we solve a particular Poisson equation to generate a smooth di...

  5. Inter-Institutional Collaboration and Team Teaching.

    Science.gov (United States)

    Gatliff, Bee; Wendel, Frederick C.

    1998-01-01

    Inter-institutional collaboration and team teaching can enhance distance education. Of particular interest to those who are new to distance education or collaborative relationships, this article discusses several issues that should be considered in the planning process to avoid potential roadblocks and to maximize returns. (Author/AEF)

  6. Investigating the Linkage between Intrinsic Motivation and Project Team Satisfaction in Undergraduate Agricultural Leadership Students

    Science.gov (United States)

    Lamm, Kevan W.; Carter, Hannah S.; Melendez, Marcus W.

    2014-01-01

    Organizations have increased the amount of work that is completed by project teams over the past several decades. This trend is projected to continue into the foreseeable future. In response to this trend, the academic community has increased the number of project team based learning experiences for students in classes. The challenge has been that…

  7. An action-learning model to assist Circuit Teams to support School ...

    African Journals Online (AJOL)

    We report on the construction of a theoretical model to assist Circuit Teams to support School Management Teams of underperforming high schools towards whole-school development in which these improvement plans play a central role. We followed an action research design, employing qualitative data generation and ...

  8. Site scientific mission plan for the southern Great Plains CART site, January--June 1998

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Lamb, P.J. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Inst. for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States). Environmental Research Div.

    1998-01-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. The primary purpose of this site scientific mission plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team, Operations Team, and Instrument Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the Site operator, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  9. A methodology and supply chain management inspired reference ontology for modeling healthcare teams.

    Science.gov (United States)

    Kuziemsky, Craig E; Yazdi, Sara

    2011-01-01

    Numerous studies and strategic plans are advocating more team based healthcare delivery that is facilitated by information and communication technologies (ICTs). However before we can design ICTs to support teams we need a solid conceptual model of team processes and a methodology for using such a model in healthcare settings. This paper draws upon success in the supply chain management domain to develop a reference ontology of healthcare teams and a methodology for modeling teams to instantiate the ontology in specific settings. This research can help us understand how teams function and how we can design ICTs to support teams.

  10. Medicine as It Should Be: Teaching Team and Teamwork during a Palliative Care Clerkship.

    Science.gov (United States)

    Head, Barbara A; Furman, Christian Davis; Lally, Andrew M; Leake, Kimberly; Pfeifer, Mark

    2018-05-01

    Interprofessional Education (IPE) is an important component of medical education. Rotations with palliative care interdisciplinary teams (IDTs) provide an optimal environment for IPE and teaching teamwork skills. Our objective was to assess the learning of senior medical students during a palliative care rotation. A constant comparison method based on grounded theory was used in this qualitative study. Senior medical students completed a semi-structured reflective writing exercise after a required one-week palliative care clerkship. Sixty randomly selected reflective writings were analyzed. The reflective writings were analyzed to evaluate the student's experiences. Dominant themes identified were related to teams and teamwork. Eight specific themes were identified: value of IDT for team members; value of IDT for patient/family; importance of each team member; reliance on other team members; roles of team members; how teams work; team communication; and interdisciplinary assessment and care planning. Students described exposure to novel experiences and planned to incorporate newly learned behaviors in their future practice. By participating in palliative care IDTs, medical students consistently learned about teamwork within healthcare. Additionally, they learned the importance of such teamwork to patients and the team itself. Rotations with palliative care IDTs have a significant role to play in IPE and preparing medical students to practice on teams.

  11. US-Russia team plans a package minireactor

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    A US-Russian joint venture has concluded design of what is called a low-cost, supersafe mini nuclear power reactor. They plan to begin construction of a 6-Mw unit in Russia in mid-1996 and to offer the standardized unit for sale in developing countries. Advanced Physics Corp., Irvine, CA, and five Russian nuclear and space industry centers plan to build the first unit in five years or less at a cost of about $150 million. The high-temperature, gas-cooled reactor will be fueled by uranium encased in graphite spheres that percolate through the core

  12. Flight Planning Branch NASA Co-op Tour

    Science.gov (United States)

    Marr, Aja M.

    2013-01-01

    This semester I worked with the Flight Planning Branch at the NASA Johnson Space Center. I learned about the different aspects of flight planning for the International Space Station as well as the software that is used internally and ISSLive! which is used to help educate the public on the space program. I had the opportunity to do on the job training in the Mission Control Center with the planning team. I transferred old timeline records from the planning team's old software to the new software in order to preserve the data for the future when the software is retired. I learned about the operations of the International Space Station, the importance of good communication between the different parts of the planning team, and enrolled in professional development classes as well as technical classes to learn about the space station.

  13. The ecology of team science: understanding contextual influences on transdisciplinary collaboration.

    Science.gov (United States)

    Stokols, Daniel; Misra, Shalini; Moser, Richard P; Hall, Kara L; Taylor, Brandie K

    2008-08-01

    Increased public and private investments in large-scale team science initiatives over the past two decades have underscored the need to better understand how contextual factors influence the effectiveness of transdisciplinary scientific collaboration. Toward that goal, the findings from four distinct areas of research on team performance and collaboration are reviewed: (1) social psychological and management research on the effectiveness of teams in organizational and institutional settings; (2) studies of cyber-infrastructures (i.e., computer-based infrastructures) designed to support transdisciplinary collaboration across remote research sites; (3) investigations of community-based coalitions for health promotion; and (4) studies focusing directly on the antecedents, processes, and outcomes of scientific collaboration within transdisciplinary research centers and training programs. The empirical literature within these four domains reveals several contextual circumstances that either facilitate or hinder team performance and collaboration. A typology of contextual influences on transdisciplinary collaboration is proposed as a basis for deriving practical guidelines for designing, managing, and evaluating successful team science initiatives.

  14. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams.

    Science.gov (United States)

    Van Hooft, Edwin A J; Van Mierlo, Heleen

    2018-01-01

    Models of team development have indicated that teams typically engage in task delay during the first stages of the team's life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams' composition in terms of individual-level trait procrastination, as well as the teams' motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy) predicted team procrastination. Team procrastination related positively to team members' stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams' collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination.

  15. The Large UV/Optical/Infrared Surveyor (LUVOIR): Decadal Mission concept technology development overview

    Science.gov (United States)

    Bolcar, Matthew R.

    2017-09-01

    The Large Ultraviolet / Optical / Infrared (LUVOIR) Surveyor is one of four large mission concept studies being developed by NASA for consideration in the 2020 Astrophysics Decadal Survey. LUVOIR will support a broad range of science objectives, including the direct imaging and spectral characterization of habitable exoplanets around sun-like stars, the study of galaxy formation and evolution, the epoch of reionization, star and planet formation, and the remote sensing of Solar System bodies. The LUVOIR Science and Technology Definition Team (STDT) has tasked a Technology Working Group (TWG), with more than 60 members from NASA centers, academia, industry, and international partners, with identifying technologies that enable or enhance the LUVOIR science mission. The TWG has identified such technologies in the areas of Coronagraphy, Ultra-Stable Opto-mechanical Systems, Detectors, Coatings, Starshades, and Instrument Components, and has completed a detailed assessment of the state-of-the-art. We present here a summary of this technology assessment effort, as well as the current progress in defining a technology development plan to mature these technologies to the required technology readiness level (TRL).

  16. The Tiger Team Process in the Rebaselining of the Plutonium Finishing Plant (PFP)

    International Nuclear Information System (INIS)

    BAILEY, R.W.

    2000-01-01

    This paper will describe the integrated, teaming approach and planning process utilized by the Tiger Team in the development of the IPMP. This paper will also serve to document the benefits derived from this implementation process

  17. Conceptualizing Interprofessional Teams as Multi-Team Systems-Implications for Assessment and Training.

    Science.gov (United States)

    West, Courtney; Landry, Karen; Graham, Anna; Graham, Lori; Cianciolo, Anna T; Kalet, Adina; Rosen, Michael; Sherman, Deborah Witt

    2015-01-01

    , Communication, Teamwork, and Self-Evaluation, was completed by 188 students including 99 from Nursing, 43 from Medicine, 6 from Pharmacy, and 40 participants who belonged to more than one component, were students at another institution, or did not indicate their institution. The team instrument was designed to assess each team member's perception of how well the team and him- or herself met the competencies. Five of the items on the team perceptions questionnaire mirrored items on the standardized patient evaluation: demonstrated leadership practices that led to effective teamwork, discussed care and decisions about that care with patient, described roles and responsibilities clearly, worked well together to coordinate care, and good/effective communication. Internal consistency reliability of the IPE Team Observation Instrument was 0.80. In 18 of the 20 items, more than 50% of observers indicated the item was demonstrated. Of those, 6 of the items were observed by 50% to 75% of the observers, and the remaining 12 were observed by more than 80% of the observers. Internal consistency reliability of the IPE Team's Perception of Collaborative Care Instrument was 0.95. The mean response score-1 (strongly disagree) to 4 (strongly agree)-was calculated for each section of the instrument. The overall mean score was 3.57 (SD = .11). Internal consistency reliability of the Standardized Patient IPE Team Evaluation Instrument was 0.87. The overall mean score was 3.28 (SD = .17). The ratings for the 5 items shared by the standardized patient and team perception instruments were compared using independent sample t tests. Statistically significant differences (p teamwork; however, challenges remain. Due to the large scale of the simulation exercise, observation-based assessment did not function as well as self- and standardized patient-based assessment. To promote greater variation in observer assessments during future Disaster Day simulations, we plan to adjust the rating scale from "not

  18. The DECADES project - Outline and general overview

    International Nuclear Information System (INIS)

    1995-01-01

    electricity generation chains and strategies in the process of planning and decision making for the electricity sector. The DECADES project is carried out jointly by the European Commission (EC), the Economic and Social Commission for Asia and the Pacific (ESCAP), the International Atomic Energy Agency (IAEA), the International Bank for Reconstruction and Development (IBRD/World Bank), the International Institute for Applied Systems Analysis (IIASA), the Nuclear Energy Agency of the OECD (OECD/NEA), the Organization of the Petroleum Exporting Countries (OPEC), the United Nations Industrial Development Organization (UNIDO) and the World Meteorological Organization (WMO). In order to cover the main issues to be addressed for carrying out comparative assessment of electricity generation options and strategies within the planning and decision making process, the DECADES project focuses on: technology inventory, i.e. characterisation of energy chains for electricity generation, from fuel extraction to waste management, including technical, economic, health and environmental aspects; development of an information system (computer software) providing user-oriented access to electronic data bases, allowing retrieval, display and handling of the data; compilation and review of methodologies, analytical models and computerised tools for comparative assessment, with emphasis on those tools that may be used in the planning and decision making process for the electricity sector; carrying out some case studies addressing specific national or regional issues, with the primary objective of illustrating the applicability of the data bases and computerised tools in the planning and decision making process. The Joint Steering Committee for the DECADES project hopes that the publications, data bases and software resulting from the project will be useful in the process of planning and decision making aiming towards design and implementation of sustainable strategies in the electricity sector

  19. Red Teaming: Past and Present

    Science.gov (United States)

    2008-05-22

    cultural and ethnocentric bias, and a focus on fully exploring alternatives. The purpose of this monograph is to examine historical and...Planning and Orders Production, introduces red team principles into the army problem solving method.14 Additionally, TRADOC staffed and funded the...organization, incorporating alternative perspectives in an attempt to eliminate cultural and ethnocentric bias, and a focus on fully exploring

  20. Site scientific mission plan for the southern Great Plain CART site July-December 1997.

    Energy Technology Data Exchange (ETDEWEB)

    Lamb, P.J.; Peppler, R.A.; Sisterson, D.L.

    1997-08-28

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on July 1, 1997, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team [DSIT], Operations Team, Instrument Team [IT], and Campaign Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  1. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams

    Science.gov (United States)

    Van Hooft, Edwin A. J.; Van Mierlo, Heleen

    2018-01-01

    Models of team development have indicated that teams typically engage in task delay during the first stages of the team’s life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams’ composition in terms of individual-level trait procrastination, as well as the teams’ motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy) predicted team procrastination. Team procrastination related positively to team members’ stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams’ collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination. PMID:29674991

  2. When Teams Fail to Self-Regulate: Predictors and Outcomes of Team Procrastination Among Debating Teams

    Directory of Open Access Journals (Sweden)

    Edwin A. J. Van Hooft

    2018-04-01

    Full Text Available Models of team development have indicated that teams typically engage in task delay during the first stages of the team’s life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The present study introduces the concept of team procrastination as a lens through which we can examine whether teams collectively engage in unplanned, voluntary, and irrational delay of team tasks. Based on theory and research on self-regulation, team processes, and team motivation we developed a conceptual multilevel model of predictors and outcomes of team procrastination. In a sample of 209 student debating teams, we investigated whether and why teams engage in collective procrastination as a team, and what consequences team procrastination has in terms of team member well-being and team performance. The results supported the existence of team procrastination as a team-level construct that has some stability over time. The teams’ composition in terms of individual-level trait procrastination, as well as the teams’ motivational states (i.e., team learning goal orientation, team performance-approach goal orientation in interaction with team efficacy predicted team procrastination. Team procrastination related positively to team members’ stress levels, especially for those low on trait procrastination. Furthermore, team procrastination had an indirect negative relationship with team performance, through teams’ collective stress levels. These findings add to the theoretical understanding of self-regulatory processes of teams, and highlight the practical importance of paying attention to team-level states and processes such as team goal orientation and team procrastination.

  3. Team Learning and Team Composition in Nursing

    Science.gov (United States)

    Timmermans, Olaf; Van Linge, Roland; Van Petegem, Peter; Elseviers, Monique; Denekens, Joke

    2011-01-01

    Purpose: This study aims to explore team learning activities in nursing teams and to test the effect of team composition on team learning to extend conceptually an initial model of team learning and to examine empirically a new model of ambidextrous team learning in nursing. Design/methodology/approach: Quantitative research utilising exploratory…

  4. The Research of Self-Management Team and Superior-Direction Team in Team Learning Influential Factors

    OpenAIRE

    Zhang Wei

    2013-01-01

    Team learning is a cure for bureaucracy; it facilitates team innovation and team performance. But team learning occurs only when necessary conditions were met. This research focused on differences of team learning influential factors between self-management team and superior-direction team. Four variables were chosen as predictors of team learning though literature review and pilot interview. The 4 variables are team motivation, team trust, team conflict and team leadership. Selected 54 self ...

  5. The impact of team familiarity and team leader experience on team coordination errors: A panel analysis of professional basketball teams

    NARCIS (Netherlands)

    Sieweke, Jost; Zhao, B.

    2015-01-01

    To explore the dynamics involved in team coordination, we examine the impact of team familiarity and team leader experience on team coordination errors (TCEs). We argue that team familiarity has a U-shaped effect on TCEs. We study the moderating effects of team leader prior experience and team

  6. Enhancing the Effectiveness of Work Groups and Teams: A Reflection.

    Science.gov (United States)

    Kozlowski, Steve W J

    2018-03-01

    Teamwork has been at the core of human accomplishment across the millennia, and it was a focus of social psychological inquiry on small group behavior for nearly half a century. However, as organizations world-wide reorganized work around teams over the past two decades, the nature of teamwork and factors influencing it became a central focus of research in organizational psychology and management. In this article, I reflect on the impetus, strategy, key features, and scientific contribution of "Enhancing the Effectiveness of Work Groups and Teams," by Kozlowski and Ilgen, a review monograph published in Psychological Science in the Public Interest in 2006.

  7. Interdependence and fit in team performance management

    NARCIS (Netherlands)

    Vijfeijken, van H.T.G.A.; Kleingeld, P.A.M.; Tuijl, van H.F.J.M.; Algera, J.A.; Thierry, H.

    2006-01-01

    Abstract: Purpose – To evaluate a proposed prescriptive model for the design of effective combinations of performance goals and pay-for-performance plans for the performance management of teams. Design/methodology/approach – The idea underlying the model – in which task, goal, and reward

  8. Comparative assessment of electricity generation options using DECADES

    International Nuclear Information System (INIS)

    Perez Martin, D.; Lopez Lopez, I.; Turtos Carbonell, L.

    1999-01-01

    Cuba is poor in primary energy resources. In 1998, 99.4% of electricity generated by the National Electric System came from fossil fuel with the environment implications that this Situation causes. Cuba joint DECADES project (Databases and methodologies for Comparative Assessment of Different Energy Sources) to support planning and decision making process with Appropriated tools. The paper presents the main work carried out with DECADES. An important Effort was devoted to implement the Country Specific Database, to assess power plants and Chains, to select and evaluate different expansion scenarios taking into consideration its Environment implications. At the same time an effort was dedicated to correct, test and Implement DECADES capabilities. The potential role of nuclear power in the expansion policy of Cuban electric system, the Influence of an Oil Steam Boiler project and control technology installation, were performed. Conclusions of the main task done with DECADES are presented

  9. Environmental control medical support team

    Science.gov (United States)

    Crump, William J.; Kilgore, Melvin V., Jr.

    1988-01-01

    The activities conducted in support of the Environmental Control and Life Support Team during December 7, 1987 through September 30, 1988 are summarized. The majority of the ongoing support has focused on the ECLSS area. Through a series of initial meetings with the ECLSS team and technical literature review, an initial list of critical topics was developed. Subtasks were then identified or additional related tasks received as action items from the ECLSS group meetings. Although most of the efforts focused on providing MSFC personnel with information regarding specific questions and problems related to ECLSS issues, other efforts regarding identifying an ECLSS Medical Support Team and constructing data bases of technical information were also initiated and completed. The specific tasks are as follows: (1) Provide support to the mechanical design and integration of test systems as related to microbiological concerns; (2) Assist with design of Human Subjects Test Protocols; (3) Interpretation and recommendations pertaining to air/water quality requirements; (4) Assist in determining the design specifications required as related to the Technical Demonstration Program; (5) Develop a data base of all microorganisms recovered from previous subsystem testing; (6) Estimates of health risk of individual microbes to test subjects; (7) Assist with setting limits for safety of test subjects; (8) Health monitoring of test subjects; (9) Assist in the preparation of test plans; (10) Assist in the development of a QA/QC program to assure the validity, accuracy and precision of the analyses; and (11) Assist in developing test plans required for future man in the loop testing.

  10. The International Drinking Water Supply and Sanitation Decade in South-East Asia.

    Science.gov (United States)

    1984-01-01

    The International Drinking Water Supply and Sanitation Decade, 1981-90, which has a diversity of objectives, takes a different form in each country. What makes this decade different from previous actions for water and sanitation is the way in which the programs, projects, and servces are to be conceived, planned, implemented, managed, operated, and maintained. The urban population to be covered by water and sanitation services, in the developing nations that have prepared plans for the Decade, is roughly between 280-290 million people. In rural areas, some 750 million people are to be provided with drinking water and around 300 million with sanitation facilities. The initial goal of 100% of the population to be provided with water and sanitation by 1990 is proving difficult to realize. Only a small proportion of developing nations have even planned for 100% coverage by 1990. The initial optimism arising from the declaration of the Decade and the expectations of increased aid has given way to realism in the face of the global recession and the scarcity of development capital. The Southeast Asia Region of the World Health Organization (WHO) covers 11 member countries with a combined population of over 1000 million people. Among the countries in Southeast Asia that have prepared Decade plans, the following populations are to be covered by 1990: urban water supply, 126 million; urban sanitation, 156 million; rural water supply, 585 million; and rural sanitation, 212 million. Such a challenge calls for a stock taking of the real issues in order to identify what action can be taken. The lack of up-to-date and comprehensive databases is a serious problem. The information system for the Decade should be and integral part of it, be timed to keep pace with it, and be developed from the lowest level. The annual investment needed during the Decade is estimated at over 4 times that prior to the Decade. The accepted strategy is to meet the minimum needs of the largest number of

  11. 42 CFR 441.156 - Team developing individual plan of care.

    Science.gov (United States)

    2010-10-01

    ... competence in child psychiatry, the team must be capable of— (1) Assessing the recipient's immediate and long... doctoral degree and a physician licensed to practice medicine or osteopathy; or (3) A physician licensed to practice medicine or osteopathy with specialized training and experience in the diagnosis and treatment of...

  12. Site scientific mission plan for the Southern Great Plains CART Site, January--June 1999

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Sisterson, D.L.; Lamb, P.

    1999-03-10

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site was designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This Site Scientific Mission Plan defines the scientific priorities for site activities during the six months beginning on January 1, 1999, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this document is to provide scientific guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team [DSIT], Operations Team, and Instrument Team [IT]) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the site program manager, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  13. Site scientific mission plan for the Southern Great Plains CART site: July--December 1998

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Lamb, P. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Inst. for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States). Environmental Research Div.

    1998-07-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site was designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This Site Scientific Mission Plan defines the scientific priorities for site activities during the six months beginning on July 1, 1998, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this document is to provide scientific guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team [DSIT], Operations Team, and Instrument Team [IT]) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the site program manager, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  14. Creating and supporting a mixed methods health services research team.

    Science.gov (United States)

    Bowers, Barbara; Cohen, Lauren W; Elliot, Amy E; Grabowski, David C; Fishman, Nancy W; Sharkey, Siobhan S; Zimmerman, Sheryl; Horn, Susan D; Kemper, Peter

    2013-12-01

    To use the experience from a health services research evaluation to provide guidance in team development for mixed methods research. The Research Initiative Valuing Eldercare (THRIVE) team was organized by the Robert Wood Johnson Foundation to evaluate The Green House nursing home culture change program. This article describes the development of the research team and provides insights into how funders might engage with mixed methods research teams to maximize the value of the team. Like many mixed methods collaborations, the THRIVE team consisted of researchers from diverse disciplines, embracing diverse methodologies, and operating under a framework of nonhierarchical, shared leadership that required new collaborations, engagement, and commitment in the context of finite resources. Strategies to overcome these potential obstacles and achieve success included implementation of a Coordinating Center, dedicated time for planning and collaborating across researchers and methodologies, funded support for in-person meetings, and creative optimization of resources. Challenges are inevitably present in the formation and operation of effective mixed methods research teams. However, funders and research teams can implement strategies to promote success. © Health Research and Educational Trust.

  15. Site Scientific Mission Plan for the Southern Great Plains CART site: January--June 1994

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, J.M.; Lamb, P.J. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Inst. for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States). Environmental Research Div.

    1993-12-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on January 1, 1994, and also looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM Functional Teams (Management Team, Experiment Support Team, Operations Team, Data Management Team, Instrument Team, and Campaign Team), and it serves to disseminate the plans more generally within the ARM Program and among the Science Team. This document includes a description of the site`s operational status and the primary envisaged site activities, together with information concerning approved and proposed Intensive Observation Periods. Amendments will be prepared and distributed whenever the content changes by more than 30% within a six-month period. The primary users of this document are the site operator, the site scientist, the Science Team through the ARM Program Science Director, the ARM Program Experiment Center, and the aforementioned ARM Program Functional Teams. This plan is a living document that will be updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  16. Team responsibility structure and team performance

    NARCIS (Netherlands)

    Doorewaard, J.A.C.M.; Hootegem, G. van; Huys, R.

    2002-01-01

    The purpose is to analyse the impact of team responsibility (the division of job regulation tasks between team leader and team members) on team performance. It bases an analysis on 36 case studies in The Netherlands which are known to have implemented team‐based work. The case studies were executed

  17. Team cohesion and team success in sport.

    Science.gov (United States)

    Carron, Albert V; Bray, Steven R; Eys, Mark A

    2002-02-01

    The main aim of this study was to examine the relationship between task cohesiveness and team success in elite teams using composite team estimates of cohesion. A secondary aim was to determine statistically the consistency (i.e. 'groupness') present in team members' perceptions of cohesion. Elite university basketball teams (n = 18) and club soccer teams (n = 9) were assessed for cohesiveness and winning percentages. Measures were recorded towards the end of each team's competitive season. Our results indicate that cohesiveness is a shared perception, thereby providing statistical support for the use of composite team scores. Further analyses indicated a strong relationship between cohesion and success (r = 0.55-0.67). Further research using multi-level statistical techniques is recommended.

  18. Site scientific mission plan for the Southern Great Plains CART site: January 1997--June 1997

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Lamb, P.J. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Institute for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States)

    1997-01-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on January 1, 1997, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team [DSIT], Operations Team, Instrument Team [IT], and Campaign Team) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  19. A Data Scheduling and Management Infrastructure for the TEAM Network

    Science.gov (United States)

    Andelman, S.; Baru, C.; Chandra, S.; Fegraus, E.; Lin, K.; Unwin, R.

    2009-04-01

    The objective of the Tropical Ecology Assessment and Monitoring Network (www.teamnetwork.org) is "To generate real time data for monitoring long-term trends in tropical biodiversity through a global network of TEAM sites (i.e. field stations in tropical forests), providing an early warning system on the status of biodiversity to effectively guide conservation action". To achieve this, the TEAM Network operates by collecting data via standardized protocols at TEAM Sites. The standardized TEAM protocols include the Climate, Vegetation and Terrestrial Vertebrate Protocols. Some sites also implement additional protocols. There are currently 7 TEAM Sites with plans to grow the network to 15 by June 30, 2009 and 50 TEAM Sites by the end of 2010. Climate Protocol The Climate Protocol entails the collection of climate data via meteorological stations located at the TEAM Sites. This includes information such as precipitation, temperature, wind direction and strength and various solar radiation measurements. Vegetation Protocol The Vegetation Protocol collects standardized information on tropical forest trees and lianas. A TEAM Site will have between 6-9 1ha plots where trees and lianas larger than a pre-specified size are mapped, identified and measured. This results in each TEAM Site repeatedly measuring between 3000-5000 trees annually. Terrestrial Vertebrate Protocol The Terrestrial Vertebrate Protocol collects standardized information on mid-sized tropical forest fauna (i.e. birds and mammals). This information is collected via camera traps (i.e. digital cameras with motion sensors housed in weather proof casings). The images taken by the camera trap are reviewed to identify what species are captured in the image by the camera trap. The image and the interpretation of what is in the image are the data for the Terrestrial Vertebrate Protocol. The amount of data collected through the TEAM protocols provides a significant yet exciting IT challenge. The TEAM Network is

  20. Barriers and facilitators to the implementation of a paediatric palliative care team

    NARCIS (Netherlands)

    Verberne, Lisa M; Kars, Marijke C; Schepers, Sasja A; Schouten-van Meeteren, Antoinette Y N; Grootenhuis, Martha A; van Delden, Johannes J M

    2018-01-01

    BACKGROUND: Over the last decade, paediatric palliative care teams (PPCTs) have been introduced to support children with life-limiting diseases and their families and to ensure continuity, coordination and quality of paediatric palliative care (PPC). However, implementing a PPCT into an organisation

  1. Barriers and facilitators to the implementation of a paediatric palliative care team

    NARCIS (Netherlands)

    Verberne, Lisa M.; Kars, Marijke C.; Schepers, Sasja A.; Schouten-van Meeteren, Antoinette Y. N.; Grootenhuis, Martha A.; van Delden, Johannes J. M.

    2018-01-01

    Over the last decade, paediatric palliative care teams (PPCTs) have been introduced to support children with life-limiting diseases and their families and to ensure continuity, coordination and quality of paediatric palliative care (PPC). However, implementing a PPCT into an organisation is a

  2. The case of the unpopular pay plan.

    Science.gov (United States)

    Ehrenfeld, T; Coil, M; Berwick, D; Nyberg, T; Beer, M

    1992-01-01

    Three years after launching the team-based Quality For All program, Top Chemical Company CEO Sam Verde was searching for a team-based compensation system that would reflect his company's new philosophy. With a committee gathered to discuss the issue, Verde confronts the fact that changing pay plans is an issue few people can agree on. "Very simply," explains vice president for compensation Gilbert Porterfield, "the plan is designed to give employees working on teams real incentives for constant improvement and overall excellence. The variable aspect of the system pays employees for the performance of their group." This doesn't sit well with the others. "It's going to punish teams like mine for the failings of others instead of rewarding us for the work we do and have already done," says packaging team representative Ruth Gibson. Another committee member feels that team-based anything is a "motivational happy land that doesn't square with how people really work." While Verde likes the proposed pay plan, he has doubts over whether his employees will accept the risk. Upper management has no problem basing 60% of its pay on TopChem's performance. But getting line employees to risk part of their salaries--even as little as 4%--on the ups and downs of the chemical industry may be more trouble than it's worth. Four experts on compensation reveal where Top Chemical went wrong in its plan and how Sam Verde might bring about change successfully.

  3. Book Review: Radiological Conditions in the Dnieper River Basin: Assessment by an International Expert Team and Recommendations for an Action Plan

    International Nuclear Information System (INIS)

    Napier, Bruce A.

    2007-01-01

    This article is a book review of a report from the International Atomic Energy Agency that was prepared by a team of scientists from Belarus, the Russian Federation, and Ukraine as an assessment of radiological contamination of the Dnieper River, which flows through these three countries. The topics covered begin with radioactive sources (actual and potential) including areas affected by the Chernobyl nuclear accident, nuclear power plants along the river and its tributaries, uranium mining and ore processing, radioactive waste storage and disposal sites, and non-power sources, such as medicine, industry, and research. The report continues with an assessment of human exposures to radiation from these sources. An additional area of consideration is radiological 'hot spots' in the region. The report finishes with conclusions and recommendations to the regional governments for a strategic action plan and individual government national plans.

  4. Should cities hosting mass gatherings invest in public health surveillance and planning? Reflections from a decade of mass gatherings in Sydney, Australia.

    Science.gov (United States)

    Thackway, Sarah; Churches, Timothy; Fizzell, Jan; Muscatello, David; Armstrong, Paul

    2009-09-08

    Mass gatherings have been defined by the World Health Organisation as "events attended by a sufficient number of people to strain the planning and response resources of a community, state or nation". This paper explores the public health response to mass gatherings in Sydney, the factors that influenced the extent of deployment of resources and the utility of planning for mass gatherings as a preparedness exercise for other health emergencies. Not all mass gatherings of people require enhanced surveillance and additional response. The main drivers of extensive public health planning for mass gatherings reflect geographical spread, number of international visitors, event duration and political and religious considerations. In these instances, the implementation of a formal risk assessment prior to the event with ongoing daily review is important in identifying public health hazards.Developing and utilising event-specific surveillance to provide early-warning systems that address the specific risks identified through the risk assessment process are essential. The extent to which additional resources are required will vary and depend on the current level of surveillance infrastructure.Planning the public health response is the third step in preparing for mass gatherings. If the existing public health workforce has been regularly trained in emergency response procedures then far less effort and resources will be needed to prepare for each mass gathering event. The use of formal emergency management structures and co-location of surveillance and planning operational teams during events facilitates timely communication and action. One-off mass gathering events can provide a catalyst for innovation and engagement and result in opportunities for ongoing public health planning, training and surveillance enhancements that outlasted each event.

  5. Should cities hosting mass gatherings invest in public health surveillance and planning? Reflections from a decade of mass gatherings in Sydney, Australia

    Directory of Open Access Journals (Sweden)

    Muscatello David

    2009-09-01

    Full Text Available Abstract Background Mass gatherings have been defined by the World Health Organisation as "events attended by a sufficient number of people to strain the planning and response resources of a community, state or nation". This paper explores the public health response to mass gatherings in Sydney, the factors that influenced the extent of deployment of resources and the utility of planning for mass gatherings as a preparedness exercise for other health emergencies. Discussion Not all mass gatherings of people require enhanced surveillance and additional response. The main drivers of extensive public health planning for mass gatherings reflect geographical spread, number of international visitors, event duration and political and religious considerations. In these instances, the implementation of a formal risk assessment prior to the event with ongoing daily review is important in identifying public health hazards. Developing and utilising event-specific surveillance to provide early-warning systems that address the specific risks identified through the risk assessment process are essential. The extent to which additional resources are required will vary and depend on the current level of surveillance infrastructure. Planning the public health response is the third step in preparing for mass gatherings. If the existing public health workforce has been regularly trained in emergency response procedures then far less effort and resources will be needed to prepare for each mass gathering event. The use of formal emergency management structures and co-location of surveillance and planning operational teams during events facilitates timely communication and action. Summary One-off mass gathering events can provide a catalyst for innovation and engagement and result in opportunities for ongoing public health planning, training and surveillance enhancements that outlasted each event.

  6. Deconstructing hydro: the BC electricity sector in this decade

    International Nuclear Information System (INIS)

    Jaccard, M.

    2001-01-01

    This paper provided speculation regarding the world-wide trend to deregulate electric utilities with particular focus on power deregulation in British Columbia. The four main issues facing electricity reform in British Columbia are to determine if publicly-owned assets should be privatised, how to achieve competitive electricity commodity prices in a de-regulated generation market, to determine the extent to which customers will be allowed direct access to sellers of electricity, and to determine which changes in industry structure are needed to ensure that control over the common carrier does not hinder fair competition. BC Hydro recently issued a plan for the next decade entitled the Integrated Electricity Plan which suggests that almost all growth in supply on the Hydro system will be limited to a few large projects totalling 900 megawatts, to be owned and operated by either BC Hydro or by the Columbia Power Corporation, another Crown entity. This plan is in complete contrast to the evolution of the electricity industry nearly everywhere else in the world where demand growth is being met almost entirely by small- and medium-scale non-utility resources issuing from competitive markets with minimal public funding. This article looks at why BC Hydro will probably be transformed significantly, even dismantled, in the coming decade. The article begins with a section explaining the cause and effects of major changes in the world-wide electricity industry. This is followed by a section reviewing what BC Hydro did in the 1990s while reform was taking place. The article also describes what BC Hydro intends to do in the next decade and explores reasons why this outcome is unlikely. The final section of the article provides an alternative vision of BC Hydro's future over the next decade. 1 tab., 3 figs

  7. Interview: Mr. Stephen Chee, team leader, UNFPA country support team (CST) for the South Pacific.

    Science.gov (United States)

    1993-09-01

    The UNFPA country support team (CST) for the South Pacific is the action-arm at the regional level of the new Technical Support Services arrangement introduced by the agency. Operational since April 1993, the CST currently covers the following Pacific island countries or territories: the Cook Islands, the Federated States of Micronesia, Fiji, Kiribati, Marshall Islands, Nauru, Niue, Palau, Papua New Guinea, Samoa, Solomon Islands, Tokelau, Tonga, Tuvalu, and Vanuatu. The CST office is located in Suva, Fiji, with the main goal of strengthening national capacity and building self-reliance in the countries of the region. The office in Suva is currently staffed by six highly qualified advisors with extensive experience in the population and related fields; two more advisors are expected to join the Team in early 1994. The Team is well equipped to provide countries and territories of the region with a wide range of technical support services ranging from ad hoc technical advisory services to the conceptualization and development of comprehensive population policies and programs. Services are offered in the areas of basic data collection, processing, and research in population dynamics; population policy formulation, evaluation, and implementation; family planning and maternal-child health; information, education, and communication; women in population and development; and population program management. The team also plays an advocacy role in mainstreaming population concerns into the programs and activities of international, regional, and national organizations. The team leader responds to questions about population problems experienced by the countries served, the scope of UNFPA assistance to country governments in the subregion, the importance of population information in the subregion, and how Asia-Pacific POPIN may help the team and countries served.

  8. Nuclear Nonproliferation Ontology Assessment Team Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Strasburg, Jana D.; Hohimer, Ryan E.

    2012-01-01

    Final Report for the NA22 Simulations, Algorithm and Modeling (SAM) Ontology Assessment Team's efforts from FY09-FY11. The Ontology Assessment Team began in May 2009 and concluded in September 2011. During this two-year time frame, the Ontology Assessment team had two objectives: (1) Assessing the utility of knowledge representation and semantic technologies for addressing nuclear nonproliferation challenges; and (2) Developing ontological support tools that would provide a framework for integrating across the Simulation, Algorithm and Modeling (SAM) program. The SAM Program was going through a large assessment and strategic planning effort during this time and as a result, the relative importance of these two objectives changed, altering the focus of the Ontology Assessment Team. In the end, the team conducted an assessment of the state of art, created an annotated bibliography, and developed a series of ontological support tools, demonstrations and presentations. A total of more than 35 individuals from 12 different research institutions participated in the Ontology Assessment Team. These included subject matter experts in several nuclear nonproliferation-related domains as well as experts in semantic technologies. Despite the diverse backgrounds and perspectives, the Ontology Assessment team functioned very well together and aspects could serve as a model for future inter-laboratory collaborations and working groups. While the team encountered several challenges and learned many lessons along the way, the Ontology Assessment effort was ultimately a success that led to several multi-lab research projects and opened up a new area of scientific exploration within the Office of Nuclear Nonproliferation and Verification.

  9. Human Capital Management Plan Fiscal Years 2003- 2010

    Energy Technology Data Exchange (ETDEWEB)

    None

    2000-03-09

    Western, like many other Federal agencies, will face significant and challenging human capital issues in the next decade. The Federal workforce is aging; baby boomers, with their valuable skills and experience, are drawing nearer to retirement and new employees joining the Federal workforce today have different career expectations from the generation that preceded them. The average age of Western’s workforce is approaching 48. Almost a third of the workforce is between 50 and 54 years and most will be eligible to retire in five years. Western has almost twice as many employees who are 55 and older as it has who are 35 and younger. As the workforce ages, the proportion of younger workers is shrinking. The U.S. Census Bureau says you can expect these developments for the next 20 years. The 45 to 65 year-old work group will grow by 54 percent but the 18 to 44 population will rise by only 4 percent. According to the Bureau of Labor Statistics workers age 25 to 44 will decline by 3 million, dropping from 51 percent of the labor force in 1998 to 44 percent in 2008. Western employees who will retire include highly skilled workers in fields such as information technology, engineering, and craft occupations. Deregulation of the electric utility industry and the establishment of regional transmission organizations and independent system operators are also demanding new and different skill mixes than those currently available in Western. Changes in workforce demographic, in the education and skills that will be required in the future, and an increasingly competitive job market, will require flexible and responsive human capital tools to attract and retain talented employees. These trends were the reason for a comprehensive review of Western’s human capital programs to determine its readiness for the future. In July 2001, a team of managers conducted a comprehensive assessment of Western’s human capital needs. The team used the assessment to draft a framework that

  10. Relationships among Team Trust, Team Cohesion, Team Satisfaction and Project Team Effectiveness as Perceived by Project Managers in Malaysia

    OpenAIRE

    Han-Ping Fung

    2014-01-01

    Today, more and more project teams are formed to achieve organizational objectives as organizations generally recognized the importance and benefits of project teams. There is a compelling reason to study what are the team outcome factors that can predict project team effectiveness as it is unclear whether these team outcome factors can yield the same result in project setting whereby there is resource and time constraint compare to normal work teams which are ongoing and operational in natur...

  11. A Collaborative, Ongoing University Strategic Planning Framework: Process, Landmines, and Lessons

    Science.gov (United States)

    Hill, Susan E. Kogler; Thomas, Edward G.; Keller, Lawrence F.

    2009-01-01

    This article examines the strategic planning process at Cleveland State University, a large metropolitan state university in Ohio. A faculty-administrative team used a communicative planning approach to develop a collaborative, ongoing, bottom-up, transparent strategic planning process. This team then spearheaded the process through plan…

  12. Integrated transportation scenario planning.

    Science.gov (United States)

    2010-07-01

    Regional land usetransportation scenario planning emerged as a planning technique in U.S. : metropolitan areas in the 1990s. Building on prior work by this research team, this study continues : to track the development and expansion of regional sc...

  13. Relay Telecommunications for the Coming Decade of Mars Exploration

    Science.gov (United States)

    Edwards, C.; DePaula, R.

    2010-01-01

    Over the past decade, an evolving network of relay-equipped orbiters has advanced our capabilities for Mars exploration. NASA's Mars Global Surveyor, 2001 Mars Odyssey, and Mars Reconnaissance Orbiter (MRO), as well as ESA's Mars Express Orbiter, have provided telecommunications relay services to the 2003 Mars Exploration Rovers, Spirit and Opportunity, and to the 2007 Phoenix Lander. Based on these successes, a roadmap for continued Mars relay services is in place for the coming decade. MRO and Odyssey will provide key relay support to the 2011 Mars Science Laboratory (MSL) mission, including capture of critical event telemetry during entry, descent, and landing, as well as support for command and telemetry during surface operations, utilizing new capabilities of the Electra relay payload on MRO and the Electra-Lite payload on MSL to allow significant increase in data return relative to earlier missions. Over the remainder of the decade a number of additional orbiter and lander missions are planned, representing new orbital relay service providers and new landed relay users. In this paper we will outline this Mars relay roadmap, quantifying relay performance over time, illustrating planned support scenarios, and identifying key challenges and technology infusion opportunities.

  14. Making Teamwork Work: Team Knowledge for Team Effectiveness.

    Science.gov (United States)

    Guchait, Priyanko; Lei, Puiwa; Tews, Michael J

    2016-01-01

    This study examined the impact of two types of team knowledge on team effectiveness. The study assessed the impact of taskwork knowledge and teamwork knowledge on team satisfaction and performance. A longitudinal study was conducted with 27 service-management teams involving 178 students in a real-life restaurant setting. Teamwork knowledge was found to impact both team outcomes. Furthermore, team learning behavior was found to mediate the relationships between teamwork knowledge and team outcomes. Educators and managers should therefore ensure these types of knowledge are developed in teams along with learning behavior for maximum effectiveness.

  15. Can the collective intentions of individual professionals within healthcare teams predict the team's performance: developing methods and theory

    Directory of Open Access Journals (Sweden)

    Bosch Marije

    2009-05-01

    Full Text Available Abstract Background Within implementation research, using theory-based approaches to understanding the behaviours of healthcare professionals and the quality of care that they reflect and designing interventions to change them is being promoted. However, such approaches lead to a new range of methodological and theoretical challenges pre-eminent among which are how to appropriately relate predictors of individual's behaviour to measures of the behaviour of healthcare professionals. The aim of this study was to explore the relationship between the theory of planned behaviour proximal predictors of behaviour (intention and perceived behavioural control, or PBC and practice level behaviour. This was done in the context of two clinical behaviours – statin prescription and foot examination – in the management of patients with diabetes mellitus in primary care. Scores for the predictor variables were aggregated over healthcare professionals using four methods: simple mean of all primary care team members' intention scores; highest intention score combined with PBC of the highest intender in the team; highest intention score combined with the highest PBC score in the team; the scores (on both constructs of the team member identified as having primary responsibility for the clinical behaviour. Methods Scores on theory-based cognitive variables were collected by postal questionnaire survey from a sample of primary care doctors and nurses from northeast England and the Netherlands. Data on two clinical behaviours were patient reported, and collected by postal questionnaire survey. Planned analyses explored the predictive value of various aggregations of intention and PBC in explaining variance in the behavioural data. Results Across the two countries and two behaviours, responses were received from 37 to 78% of healthcare professionals in 57 to 93% practices; 51% (UK and 69% (Netherlands of patients surveyed responded. None of the aggregations of

  16. Planning Innovation and Regional Development: the Spreading of Urban Strategic Planning in Southern Italy

    OpenAIRE

    Vinci, Ignazio

    2011-01-01

    For decades the Italian system of planning has been strongly characterized by a regulatory approach and the question of cities' development had been taken into account within general land use plans. In the 1990s this approach has been considered a strong constraint on the regeneration of cities and the revitalization of their economic potential. Therefore, in the last decade the improvement of flexibility and participation within planning processes were considered primary objectives both at r...

  17. Multidisciplinary team (MDT) approach to management of malignant ...

    African Journals Online (AJOL)

    Background: Multidisciplinary Team meetings (MDTs) in cancer management emphasize collaborative decision making and treatment planning among core members of the specialties relevant to an index case, who come together to share their knowledge and make recommendations for an 'all-inclusive' patient ...

  18. Planning meeting to form the CMSN Team: Building a unified computational model for the resonant X-ray scattering of strongly correlated materials. Final report

    International Nuclear Information System (INIS)

    van Veenendaal, M.

    2008-01-01

    The planning meeting was held May 21-23 2008 at Argonne National Laboratory (ANL). The purpose of the meeting was to establish a network on building computational model for resonant elastic and inelastic x-ray scattering. This course of action was recommended by program officer Dale Koelling after the initial submission of a proposal for a Computational Materials Science Network to Basic Energy Sciences. The meeting consisted of talks and discussion. At the end of the meeting three subgroups were formed. After the successful formation of the team, a new proposal was written which was funded by BES. Since this was a planning meeting there were no proceedings. The program and titles of talks are given.

  19. International Management: Creating a More Realistic Global Planning Environment.

    Science.gov (United States)

    Waldron, Darryl G.

    2000-01-01

    Discusses the need for realistic global planning environments in international business education, introducing a strategic planning model that has teams interacting with teams to strategically analyze a selected multinational company. This dynamic process must result in a single integrated written analysis that specifies an optimal strategy for…

  20. Nutrition in team sports.

    Science.gov (United States)

    Mujika, Iñigo; Burke, Louise M

    2010-01-01

    Team sports are based on intermittent high-intensity activity patterns, but the exact characteristics vary between and within codes, and from one game to the next. Despite the challenge of predicting exact game demands, performance in team sports is often dependent on nutritional factors. Chronic issues include achieving ideal levels of muscle mass and body fat, and supporting the nutrient needs of the training program. Acute issues, both for training and in games, include strategies that allow the player to be well fuelled and hydrated over the duration of exercise. Each player should develop a plan of consuming fluid and carbohydrate according to the needs of their activity patterns, within the breaks that are provided in their sport. In seasonal fixtures, competition varies from a weekly game in some codes to 2-3 games over a weekend road trip in others, and a tournament fixture usually involves 1-3 days between matches. Recovery between events is a major priority, involving rehydration, refuelling and repair/adaptation activities. Some sports supplements may be of value to the team athlete. Sports drinks, gels and liquid meals may be valuable in allowing nutritional goals to be met, while caffeine, creatine and buffering agents may directly enhance performance. Copyright © 2011 S. Karger AG, Basel.

  1. Analyzing the Interprofessional Working of a Home-Based Primary Care Team.

    Science.gov (United States)

    Smith-Carrier, Tracy; Neysmith, Sheila

    2014-09-01

    Increasingly, interprofessional teams are responsible for providing integrated health care services. Effective teams, however, are not the result of chance but require careful planning and ongoing attention to team processes. Based on a case study involving interviews, participant observation, and a survey, we identified key attributes for effective interprofessional working (IPW) within a home-based primary care (HBPC) setting. Recognizing the importance of a theoretical model that reflects the multidimensional nature of team effectiveness research, we employed the integrated team effectiveness model to analyze our findings. The results indicated that a shared vision, common goals, respect, and trust among team members – as well as processes for ongoing communication, effective leadership, and mechanisms for conflict resolution – are vital in the development of a high-functioning IPW team. The ambiguity and uncertainty surrounding the context of service provision (clients' homes), as well the negotiation of external relationships in the HBPC field, require further investigation.

  2. Assisting School Management Teams to Construct Their School Improvement Plans: An Action Learning Approach

    Science.gov (United States)

    Van Der Voort, Geoffrey; Wood, Lesley

    2014-01-01

    This article reports on a first cycle of a larger action research study conducted to determine how Circuit Teams could support School Management Teams of underperforming high schools towards whole-school development. Although it is a mandated requirement by the Department of Education, none of the four schools involved in the study had developed a…

  3. Can staff attitudes to team working in stroke care be improved?

    Science.gov (United States)

    Gibbon, Bernard; Watkins, Caroline; Barer, David; Waters, Karen; Davies, Steve; Lightbody, Liz; Leathley, Michael

    2002-10-01

    Teamwork is regarded as the cornerstone of rehabilitation. It is recognized that the skills of a multiprofessional team are required to provide the care and interventions necessary to maximize the patient's potential to recover from his/her stroke. Critical evaluation of team working is lacking in the literature. Indeed, there is no consensus on a precise definition of teamwork or on the best way of implementing it, beyond a general exhortation to members to work to the same therapeutic plan in a cohesive manner. The literature has highlighted many problems in team working, including petty jealousies, ignorance and a perceived loss of autonomy and threat to professional status. To determine if the use of team co-ordinated approaches to stroke care and rehabilitation would improve staff attitudes to team working. A pre-post design was adopted using 'The Team Climate Inventory' to explore attitudes to team working before and after introducing the interventions. Local Research Ethics Committee approval was obtained. Improvements in attitudes towards team working suggest that the introduction of team co-ordinated approaches (integrated care pathways and team notes) did not result in greater team working. The introduction of an integrated care pathway and team notes is based on an assumption that they would enhance team working. The results suggest that the introduction of team co-ordinated approaches (team notes and care pathways) do not improve attitudes to team working, teams appear to take a long time to establish cohesion and develop shared values.

  4. Teams and teamwork at NASA Langley Research Center

    Science.gov (United States)

    Dickinson, Terry L.

    1994-01-01

    The recent reorganization and shift to managing total quality at the NASA Langley Research Center (LaRC) has placed an increasing emphasis on teams and teamwork in accomplishing day-to-day work activities and long-term projects. The purpose of this research was to review the nature of teams and teamwork at LaRC. Models of team performance and teamwork guided the gathering of information. Current and former team members served as participants; their collective experience reflected membership in over 200 teams at LaRC. The participants responded to a survey of open-ended questions which assessed various aspects of teams and teamwork. The participants also met in a workshop to clarify and elaborate on their responses. The work accomplished by the teams ranged from high-level managerial decision making (e.g., developing plans for LaRC reorganization) to creating scientific proposals (e.g., describing spaceflight projects to be designed, sold, and built). Teams typically had nine members who remained together for six months. Member turnover was around 20 percent; this turnover was attributed to heavy loads of other work assignments and little formal recognition and reward for team membership. Team members usually shared a common and valued goal, but there was not a clear standard (except delivery of a document) for knowing when the goal was achieved. However, members viewed their teams as successful. A major factor in team success was the setting of explicit a priori rules for communication. Task interdependencies between members were not complex (e.g., sharing of meeting notes and ideas about issues), except between members of scientific teams (i.e., reliance on the expertise of others). Thus, coordination of activities usually involved scheduling and attendance of team meetings. The team leader was designated by the team's sponsor. This leader usually shared power and responsibilities with other members, such that team members established their own operating

  5. Kennedy Space Center Orion Processing Team Planning for Ground Operations

    Science.gov (United States)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    Topics in this presentation are: Constellation Ares I/Orion/Ground Ops Elements Orion Ground Operations Flow Orion Operations Planning Process and Toolset Overview, including: 1 Orion Concept of Operations by Phase 2 Ops Analysis Capabilities Overview 3 Operations Planning Evolution 4 Functional Flow Block Diagrams 5 Operations Timeline Development 6 Discrete Event Simulation (DES) Modeling 7 Ground Operations Planning Document Database (GOPDb) Using Operations Planning Tools for Operability Improvements includes: 1 Kaizen/Lean Events 2 Mockups 3 Human Factors Analysis

  6. An Investigation of Agility Issues in Scrum Teams Using Agility Indicators

    Science.gov (United States)

    Pikkarainen, Minna; Wang, Xiaofeng

    Agile software development methods have emerged and become increasingly popular in recent years; yet the issues encountered by software development teams that strive to achieve agility using agile methods are yet to be explored systematically. Built upon a previous study that has established a set of indicators of agility, this study investigates what issues are manifested in software development teams using agile methods. It is focussed on Scrum teams particularly. In other words, the goal of the chapter is to evaluate Scrum teams using agility indicators and therefore to further validate previously presented agility indicators within the additional cases. A multiple case study research method is employed. The findings of the study reveal that the teams using Scrum do not necessarily achieve agility in terms of team autonomy, sharing, stability and embraced uncertainty. The possible reasons include previous organizational plan-driven culture, resistance towards the Scrum roles and changing resources.

  7. Tiger Team Assessments seventeen through thirty-five: A summary and analysis

    International Nuclear Information System (INIS)

    1992-12-01

    This report provides a summary and analysis of the Department of Energy's (DOE'S) 19 Tiger Team Assessments that were conducted from October 1990 to July 1992. The sites are listed in the box below, along with their respective program offices and assessment completion dates. This analysis relied solely on the information contained in the Tiger Team Assessment Reports. The findings and concerns documented by the Tiger Teams provide a database of information about the then-current ES ampersand H programs and practice. Program Secretarial Officers (PSOS) and field managers may use this information, along with other sources (such as the Corrective Action Plans, Progress Assessments, and Self-Assessments), to address the ES ampersand H deficiencies found, prioritize and plan appropriate corrective actions, measure progress toward solving the problems, strengthen and transfer knowledge about areas where site performance exemplified the ES ampersand H mindset, and so forth. Further analyses may be suggested by the analysis presented in this report

  8. The second decade

    Directory of Open Access Journals (Sweden)

    M. Amini

    2004-12-01

    Full Text Available   It is ten years since the Iranian Journal of Physics Research has been in publication. For the Occasion of the 10th anniversary of its publication, we have planned several changes and modifications. These includes increasing the annual issues to four and omission of Introduction of Previously-Published Papers in International Journals section. In this article some statistical information of the published articles is given together with the index of the journals referees. As we enter the second decade of our publication, we face several questions. In this article we share these questions with our readers in the hope of finding the best possible solutions, so that we would be able to publish a better journal in future.

  9. Tiger team findings related to DOE environmental restoration activities

    International Nuclear Information System (INIS)

    Levitan, W.M.

    1991-01-01

    Tiger Team Assessments were implemented in June 1989 as part of a strategy to ensure that DOE facilities fully comply with Federal, state, local and DOE environment, safety, and health (ES ampersand H) requirements. The Tiger Teams provide the Secretary of Energy with information on current ES ampersand H compliance status of each DOE facility and causes for noncompliance. To date, Tiger Team Assessments have been completed at 25 DOE facilities. With regard to assessments of environmental restoration activities, the performance of DOE facilities was evaluated against the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, the National Contingency Plan (NCP), and DOE Order 5400.4, CERCLA Requirements, among others. Five major categories of environmental restoration-related findings were identified: (1) environmental restoration program planning and management (found at 60 percent of the sites assessed); (2) community relations/administrative record (60 percent); (3) characterization of extent of contamination (56 percent); (4) identification and evaluation of inactive waste sites (56 percent); and (5) DOE and NCP requirements for response action studies (44 percent). Primary causal factors for these findings were inadequate procedures, resources, supervision, and policy implementation

  10. Defining Components of Team Leadership and Membership in Prehospital Emergency Medical Services.

    Science.gov (United States)

    Crowe, Remle P; Wagoner, Robert L; Rodriguez, Severo A; Bentley, Melissa A; Page, David

    2017-01-01

    Teamwork is critical for patient and provider safety in high-stakes environments, including the setting of prehospital emergency medical services (EMS). We sought to describe the components of team leadership and team membership on a single patient call where multiple EMS providers are present. We conducted a two-day focus group with nine subject matter experts in crew resource management (CRM) and EMS using a structured nominal group technique (NGT). The specific question posed to the group was, "What are the specific components of team leadership and team membership on a single patient call where multiple EMS providers are present?" After round-robin submission of ideas and in-depth discussion of the meaning of each component, participants voted on the most important components of team leadership and team membership. Through the NGT process, we identified eight components of team leadership: a) creates an action plan; b) communicates; c) receives, processes, verifies, and prioritizes information; d) reconciles incongruent information; e) demonstrates confidence, compassion, maturity, command presence, and trustworthiness; f) takes charge; g) is accountable for team actions and outcomes; and h) assesses the situation and resources and modifies the plan. The eight essential components of team membership identified included: a) demonstrates followership, b) maintains situational awareness, c) demonstrates appreciative inquiry, d) does not freelance, e) is an active listener, f) accurately performs tasks in a timely manner, g) is safety conscious and advocates for safety at all times, and h) leaves ego and rank at the door. This study used a highly structured qualitative technique and subject matter experts to identify components of teamwork essential for prehospital EMS providers. These findings and may be used to help inform the development of future EMS training and assessment initiatives.

  11. Strategic momentum in virtual R&D project teams : a complement to management

    NARCIS (Netherlands)

    Opdenakker, R.J.G.

    2012-01-01

    In recent decades there is a growing interest in working in multidisciplinary teams. A main reason for this is that often solving problems in organisations needs the use of various different expertises. As these expertises often are not to be found concentrated in one place, this interest is

  12. Planned change or emergent change implementation approach and nurses' professional clinical autonomy.

    Science.gov (United States)

    Luiking, Marie-Louise; Aarts, Leon; Bras, Leo; Grypdonck, Maria; van Linge, Roland

    2017-11-01

    Nurses' clinical autonomy is considered important for patients' outcome and influenced by the implementation approach of innovations. Emergent change approach with participation in the implementation process is thought to increase clinical autonomy. Planned change approach without this participation is thought not to increase clinical autonomy. Evidence of these effects on clinical autonomy is however limited. To examine the changes in clinical autonomy and in personal norms and values for a planned change and emergent change implementation of an innovation, e.g. intensive insulin therapy. Prospective comparative study with two geographically separated nurses' teams on one intensive care unit (ICU), randomly assigned to the experimental conditions. Data were collected from March 2008 to January 2009. Pre-existing differences in perception of team and innovation characteristics were excluded using instruments based on the innovation contingency model. The Nursing Activity Scale was used to measure clinical autonomy. The Personal Values and Norms instrument was used to assess orientation towards nursing activities and the Team Learning Processes instrument to assess learning as a team. Pre-implementation the measurements did not differ. Post-implementation, clinical autonomy was increased in the emergent change team and decreased in the planned change team. The Personal Values and Norms instrument showed in the emergent change team a decreased hierarchic score and increased developmental and rational scores. In the planned change team the hierarchical and group scores were increased. Learning as a team did not differ between the teams. In both teams there was a change in clinical autonomy and orientation towards nursing activities, in line with the experimental conditions. Emergent change implementation resulted in more clinical autonomy than planned change implementation. If an innovation requires the nurses to make their own clinical decisions, an emergent change

  13. Groups Meet . . . Teams Improve: Building Teams That Learn

    Science.gov (United States)

    Hillier, Janet; Dunn-Jensen, Linda M.

    2013-01-01

    Although most business students participate in team-based projects during undergraduate or graduate course work, the team experience does not always teach team skills or capture the team members' potential: Students complete the task at hand but the explicit process of becoming a team is often not learned. Drawing from organizational learning…

  14. Teams make it work: how team work engagement mediates between social resources and performance in teams.

    Science.gov (United States)

    Torrente, Pedro; Salanova, Marisa; Llorens, Susana; Schaufeli, Wilmar B

    2012-02-01

    In this study we analyze the mediating role of team work engagement between team social resources (i.e., supportive team climate, coordination, teamwork), and team performance (i.e., in-role and extra-role performance) as predicted by the Job Demands-Resources Model. Aggregated data of 533 employees nested within 62 teams and 13 organizations were used, whereas team performance was assessed by supervisor ratings. Structural equation modeling revealed that, as expected, team work engagement plays a mediating role between social resources perceived at the team level and team performance as assessed by the supervisor.

  15. Modernization of the Almaraz, AscO & VandellOs non-1E Control systems during the last decade the Spanish PWR nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Fuente Arias, E. de la; Serrano Jimenez, J.; Madroñal Rodriguez, E.

    2016-07-01

    During the last decade the Spanish PWR nuclear power plants designed by Westinghouse have planned and implemented the modernization of the non-1E Control systems. The driving forces behind the modernization of the original Control Systems are the management of the obsolescence of these systems and the implementation of functional improvements in the plants to increase the Control System reliability and availability. Westinghouse Ovation platform has been used in the modernization of the Reactor Control System, Turbine Control System, Plant Computer and Feedwater Heaters Level and MSR s Drains tanks Level control. Modernizations have been spread through the years in such a way that there is not impact on the outages and the different organizations on the customer and estinghouse can have dedicated teams to work in these projects. (Author)

  16. Site scientific mission plan for the southern great plains CART site January-June 2000.; TOPICAL

    International Nuclear Information System (INIS)

    Peppler, R. A.; Sisterson, D. L.; Lamb, P.

    2001-01-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site was designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This Site Scientific Mission Plan defines the scientific priorities for site activities during the six months beginning on January 1, 2000, and looks forward in less detail to subsequent six-month periods. The primary purpose of this document is to provide scientific guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams (Management Team, Data and Science Integration Team[DSIT], Operations Team, and Instrument Team[IT]) and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). The primary users of this document are the site operator, the site program manager, the Site Scientist Team (SST), the Science Team through the ARM Program science director, the ARM Program Experiment Center, and the aforementioned ARM Program functional teams. This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding. With this issue, many aspects of earlier Site Scientific Mission Plan reports have been moved to ARM sites on the World Wide Web. This report and all previous reports are available on the SGP CART web site

  17. Personality and community prevention teams: Dimensions of team leader and member personality predicting team functioning.

    Science.gov (United States)

    Feinberg, Mark E; Kim, Ji-Yeon; Greenberg, Mark T

    2008-11-01

    The predictors and correlates of positive functioning among community prevention teams have been examined in a number of research studies; however, the role of personality has been neglected. In this study, we examined whether team member and leader personality dimensions assessed at the time of team formation predicted local prevention team functioning 2.5-3.5 years later. Participants were 159 prevention team members in 14 communities participating in the PROSPER study of prevention program dissemination. Three aspects of personality, aggregated at the team level, were examined as predictors: Openness to Experience, Conscientiousness, and Agreeableness. A series of multivariate regression analyses were performed that accounted for the interdependency of five categories of team functioning. Results showed that average team member Openness was negatively, and Conscientiousness was positively linked to team functioning. The findings have implications for decisions about the level and nature of technical assistance support provided to community prevention teams.

  18. Shaping the Culture: Organizational Development through Team Building.

    Science.gov (United States)

    Yeager, James F.

    This practicum developed and implemented an organization development plan to improve agency and team effectiveness and staff satisfaction at a private agency that provides educational and treatment services to children with emotional, mental, or behavioral disorders. An extensive literature review on organizational development was conducted and…

  19. Meeting the management challenges of the Decade of Action for Road Safety

    Directory of Open Access Journals (Sweden)

    Tony Bliss

    2012-03-01

    Full Text Available In low- and middle-income countries, the high price paid for mobility in terms of human loss and suffering is forecast to rise to unprecedented levels. More than 50 million deaths and 500 million serious injuries on the world's roads can be projected with some certainty over the first 50 years of the 21st century, unless sustained new initiatives are taken. This paper addresses the emergence of road safety as a development priority over the last decade and the management challenges facing the planned global response aimed at bringing road safety outcomes in developing countries under control. It outlines the decade of advocacy that created the UN Decade of Action for Road Safety 2011–2020 and related Global Plan, and highlights the concern that over the coming decade low and middle income countries will face considerable management challenges in successfully implementing related measures and sustaining their delivery. The paper discusses new road safety management tools that have been developed by the World Bank and ISO to provide assistance to countries and organizations within an integrated framework that ensures that measures taken are properly sequenced and adjusted to their absorptive and learning capacities. It concludes that strengthened institutions and the accelerated knowledge creation and transfer central to this, plus scaled-up investment and increased international cooperation and development aid are critical to the successful achievement of the Global Plan's ambitious goal.

  20. NASA Microgravity Science Competition for High-school-aged Student Teams

    Science.gov (United States)

    DeLombard, Richard; Stocker, Dennis; Hodanbosi, Carol; Baumann, Eric

    2002-01-01

    NASA participates in a wide variety of educational activities including competitive events. There are competitive events sponsored by NASA and student teams which are mentored by NASA centers. This participation by NASA in public forums serves to bring the excitement of aerospace science to students and educators. A new competition for highschool-aged student teams involving projects in microgravity has completed two pilot years and will have national eligibility for teams during the 2002-2003 school year. A team participating in the Dropping In a Microgravity Environment will research the field of microgravity, develop a hypothesis, and prepare a proposal for an experiment to be conducted in a microgravity drop tower facility. A team of NASA scientists and engineers will select the top proposals and those teams will then design and build their experiment apparatus. When the experiment apparatus are completed, team representatives will visit NASA Glenn in Cleveland, Ohio for operation of their facility and participate in workshops and center tours. Presented in this paper will be a description of DIME, an overview of the planning and execution of such a program, results from the first two pilot years, and a status of the first national competition.

  1. Team-Based Interprofessional Competency Training for Dementia Screening and Management.

    Science.gov (United States)

    Tan, Zaldy S; Damron-Rodriguez, JoAnn; Cadogan, Mary; Gans, Daphna; Price, Rachel M; Merkin, Sharon S; Jennings, Lee; Schickedanz, Heather; Shimomura, Sam; Osterweil, Dan; Chodosh, Joshua

    2017-01-01

    As many as 50% of people satisfying diagnostic criteria for dementia are undiagnosed. A team-based training program for dementia screening and management was developed targeting four professions (medicine, nursing, pharmacy, social work) whose scope of practice involves dementia care. An interprofessional group of 10 faculty members was trained to facilitate four interactive competency stations on dementia screening, differential diagnoses, dementia management and team care planning, and screening for and managing caregiver stress. Registrants were organized into teams of five members, with at least one member of each profession per team. The teams rotated through all stations, completing assigned tasks through interprofessional collaboration. A total of 117 professionals (51 physicians, 11 nurses, 20 pharmacists, 24 social workers, 11 others) successfully completed the program. Change scores showed significant improvements in overall competence in dementia assessment and intervention (very low = 1; very high = 5; average change 1.12, P managing medication (average change 0.86, P team-based interprofessional competency training is a team teaching model that can be used to enhance competency in dementia screening and management in medical, nursing, pharmacy, and social work practitioners. © 2016, Copyright the Authors Journal compilation © 2016, The American Geriatrics Society.

  2. Developing and Managing Cross-Functional Teams: A Multi-Case Study of Brazilian Manufacturing Companies

    Directory of Open Access Journals (Sweden)

    Márcio Lopes Pimenta

    2014-06-01

    Full Text Available The growth of industries and the strong economic base in Brazil require improvements and adaptations in business processes. Cross-functional teams (CFT may help to companies achieve these improvements. This research looks at characterizing CFT according to application processes, structures, objectives and impacts, considering the context of demand planning and related processes. In-depth interviews with 22 managers were performed in three Brazilian manufacturing companies. A framework to characterize CFT and respective impacts is proposed, including elements such as: procedures, context and goals, power distribution, impacts on cross-functional integration, impacts on teams' performance and on organization's performance. One significant managerial finding is that effective and efficient CFTs need balanced distribution of power among members by effectively establishing and structuring the team. By doing this, managers may observe positive impacts on inter-functional integration and in firm's results. Moreover, teams should permanently perform joint planning to predict unfavorable situations, improve communication and mutual understanding.

  3. Two Decades of Planning in Latin American Universities: Trends and Perspectives.

    Science.gov (United States)

    Escala, Miguel J.

    The paper provides a framework for identifying trends in planning in Latin American universities for the last 20 years. Identification of the planning trends is based on two main dimensions: the purpose of the relationship between universities and the external environment (organization-centered versus society-centered), and the degree by which the…

  4. Consequences of team charter quality: Teamwork mental model similarity and team viability in engineering design student teams

    Science.gov (United States)

    Conway Hughston, Veronica

    Since 1996 ABET has mandated that undergraduate engineering degree granting institutions focus on learning outcomes such as professional skills (i.e. solving unstructured problems and working in teams). As a result, engineering curricula were restructured to include team based learning---including team charters. Team charters were diffused into engineering education as one of many instructional activities to meet the ABET accreditation mandates. However, the implementation and execution of team charters into engineering team based classes has been inconsistent and accepted without empirical evidence of the consequences. The purpose of the current study was to investigate team effectiveness, operationalized as team viability, as an outcome of team charter implementation in an undergraduate engineering team based design course. Two research questions were the focus of the study: a) What is the relationship between team charter quality and viability in engineering student teams, and b) What is the relationship among team charter quality, teamwork mental model similarity, and viability in engineering student teams? Thirty-eight intact teams, 23 treatment and 15 comparison, participated in the investigation. Treatment teams attended a team charter lecture, and completed a team charter homework assignment. Each team charter was assessed and assigned a quality score. Comparison teams did not join the lecture, and were not asked to create a team charter. All teams completed each data collection phase: a) similarity rating pretest; b) similarity posttest; and c) team viability survey. Findings indicate that team viability was higher in teams that attended the lecture and completed the charter assignment. Teams with higher quality team charter scores reported higher levels of team viability than teams with lower quality charter scores. Lastly, no evidence was found to support teamwork mental model similarity as a partial mediator of the team charter quality on team viability

  5. When teams fail to self-regulate: Predictors and outcomes of team procrastination among debating teams

    NARCIS (Netherlands)

    E.A.J. van Hooft (Edwin); H. van Mierlo (Heleen)

    2018-01-01

    textabstractModels of team development have indicated that teams typically engage in task delay during the first stages of the team's life cycle. An important question is to what extent this equally applies to all teams, or whether there is variation across teams in the amount of task delay. The

  6. Team player styles, team design variables and team work effectiveness in Egypt

    OpenAIRE

    El-Kot, Ghada Awed Hassan

    2001-01-01

    The literature has revealed few studies of management in Arab countries in general and particularly in Egypt. Many Egyptian organisations implemented the team concept a number of years ago, however, there do not appear to be any studies investicitaýt inc",D team work effectiveness in Egypt. The literature review and the findings of a pilot study emphasised the need for empirical research in team work in Egypt. Team effectiveness models are examined in order to identify the fact...

  7. Planning and Implementing Shared Teaching: An MBA Team-Teaching Case Study

    Science.gov (United States)

    Helms, Marilyn M.; Alvis, John M.; Willis, Marilyn

    2005-01-01

    Team teaching is a popular trend in business education. In an attempt to integrate seemingly disparate functional disciplines, a number of business programs have combined courses. Regardless of the courses combined (marketing and finance, management and accounting, economics and strategy, or production and cost accounting), the teaching pedagogy…

  8. Chicago-St. Louis high speed rail plan

    Energy Technology Data Exchange (ETDEWEB)

    Stead, M.E.

    1994-12-31

    The Illinois Department of Transportation (IDOT), in cooperation with Amtrak, undertook the Chicago-St. Louis High Speed Rail Financial and Implementation Plan study in order to develop a realistic and achievable blueprint for implementation of high speed rail in the Chicago-St. Louis corridor. This report presents a summary of the Price Waterhouse Project Team`s analysis and the Financial and Implementation Plan for implementing high speed rail service in the Chicago-St. Louis corridor.

  9. Enhancing team-sport athlete performance: is altitude training relevant?

    Science.gov (United States)

    Billaut, François; Gore, Christopher J; Aughey, Robert J

    2012-09-01

    Field-based team sport matches are composed of short, high-intensity efforts, interspersed with intervals of rest or submaximal exercise, repeated over a period of 60-120 minutes. Matches may also be played at moderate altitude where the lower oxygen partial pressure exerts a detrimental effect on performance. To enhance run-based performance, team-sport athletes use varied training strategies focusing on different aspects of team-sport physiology, including aerobic, sprint, repeated-sprint and resistance training. Interestingly, 'altitude' training (i.e. living and/or training in O(2)-reduced environments) has only been empirically employed by athletes and coaches to improve the basic characteristics of speed and endurance necessary to excel in team sports. Hypoxia, as an additional stimulus to training, is typically used by endurance athletes to enhance performance at sea level and to prepare for competition at altitude. Several approaches have evolved in the last few decades, which are known to enhance aerobic power and, thus, endurance performance. Altitude training can also promote an increased anaerobic fitness, and may enhance sprint capacity. Therefore, altitude training may confer potentially-beneficial adaptations to team-sport athletes, which have been overlooked in contemporary sport physiology research. Here, we review the current knowledge on the established benefits of altitude training on physiological systems relevant to team-sport performance, and conclude that current evidence supports implementation of altitude training modalities to enhance match physical performances at both sea level and altitude. We hope that this will guide the practice of many athletes and stimulate future research to better refine training programmes.

  10. [Support Team for Investigator-Initiated Clinical Research].

    Science.gov (United States)

    Fujii, Hisako

    2017-07-01

    Investigator-initiated clinical research is that in which investigators plan and carry out their own clinical research in academia. For large-scale clinical research, a team should be organized and implemented. This team should include investigators and supporting staff, who will promote smooth research performance by fulfilling their respective roles. The supporting staff should include project managers, administrative personnel, billing personnel, data managers, and clinical research coordinators. In this article, I will present the current status of clinical research support and introduce the research organization of the Dominantly Inherited Alzheimer Network (DIAN) study, an investigator-initiated international clinical research study, with particular emphasis on the role of the project management staff and clinical research coordinators.

  11. TEAM.

    Science.gov (United States)

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    This document presents materials covering the television campaign against drunk driving called "TEAM" (Techniques for Effective Alcohol Management). It is noted that TEAM's purpose is to promote effective alcohol management in public facilities and other establishments that serve alcoholic beverages. TEAM sponsors are listed, including…

  12. Team dynamics within quality improvement teams: a scoping review.

    Science.gov (United States)

    Rowland, Paula; Lising, Dean; Sinclair, Lynne; Baker, G Ross

    2018-03-31

    This scoping review examines what is known about the processes of quality improvement (QI) teams, particularly related to how teams impact outcomes. The aim is to provide research-informed guidance for QI leaders and to inform future research questions. Databases searched included: MedLINE, EMBASE, CINAHL, Web of Science and SCOPUS. Eligible publications were written in English, published between 1999 and 2016. Articles were included in the review if they examined processes of the QI team, were related to healthcare QI and were primary research studies. Studies were excluded if they had insufficient detail regarding QI team processes. Descriptive detail extracted included: authors, geographical region and health sector. The Integrated (Health Care) Team Effectiveness Model was used to synthesize findings of studies along domains of team effectiveness: task design, team process, psychosocial traits and organizational context. Over two stages of searching, 4813 citations were reviewed. Of those, 48 full-text articles are included in the synthesis. This review demonstrates that QI teams are not immune from dysfunction. Further, a dysfunctional QI team is not likely to influence practice. However, a functional QI team alone is unlikely to create change. A positive QI team dynamic may be a necessary but insufficient condition for implementing QI strategies. Areas for further research include: interactions between QI teams and clinical microsystems, understanding the role of interprofessional representation on QI teams and exploring interactions between QI team task, composition and process.

  13. An overview and guide: planning instructional radio.

    Science.gov (United States)

    Imhoof, M

    1984-03-01

    Successful instructional radio projects require both comprehensive and complex planning. The instructional radio planning team needs to have knowledge and capabilities in several technical, social, and educational areas. Among other skills, the team must understand radio, curriculum design, the subject matter being taught, research and evaluation, and the environment in which the project operates. Once a basic approach to educational planning has been selected and broad educational goals set, radio may be selected as a cost effective means of achieving some of the goals. Assuming radio is a wise choice, there are still several factors which must be analyzed by a team member who is a radio specialist. The most obvious consideration is the inventory and evaluation of the facilities: studios; broadcast, recording, and transmission equipment; classroom radios; and so on. Capabilities of broadcast personnel are another consideration. Initial radio lessons need to teach the learners how to listen to the radio if they have no previous experience with institutional radio broadcasts. A captive, inschool audience ready to listen to radio instructions requires a different use of the medium than a noncaptive audience. With the noncaptive audience, the educational broadcaster must compete with entertaining choices from other media and popular activities and pastimes of the community. The most complex knowledge and analysis required in planning instructional radio concerns the relationship of the content to the medium. Environmental factors are important in planning educational programs. The physical environment may present several constraints on the learning experience and the use of radio. The most obvious is the effect of climate and terrain on the quality of radio reception. The physical environment is easily studied through experience in the target area, but this knowledge plays a significant role in designing effective learning materials for specific learners. Social

  14. Important Non-Technical Skills in Video-Assisted Thoracoscopic Surgery Lobectomy: Team Perspectives.

    Science.gov (United States)

    Gjeraa, Kirsten; Mundt, Anna S; Spanager, Lene; Hansen, Henrik J; Konge, Lars; Petersen, René H; Østergaard, Doris

    2017-07-01

    Safety in the operating room is dependent on the team's non-technical skills. The importance of non-technical skills appears to be different for minimally invasive surgery as compared with open surgery. The aim of this study was to identify which non-technical skills are perceived by team members to be most important for patient safety, in the setting of video-assisted thoracoscopic surgery (VATS) lobectomy. This was an explorative, semistructured interview-based study with 21 participants from all four thoracic surgery centers in Denmark that perform VATS lobectomy. Data analysis was deductive, and directed content analysis was used to code the text into the Oxford Non-Technical Skills system for evaluating operating teams' non-technical skills. The most important non-technical skills described by the VATS teams were planning and preparation, situation awareness, problem solving, leadership, risk assessment, and teamwork. These non-technical skills enabled the team to achieve shared mental models, which in turn facilitated their efforts to anticipate next steps. This was viewed as important by the participants as they saw VATS lobectomy as a high-risk procedure with complementary and overlapping scopes of practice between surgical and anesthesia subteams. This study identified six non-technical skills that serve as the foundation for shared mental models of the patient, the current situation, and team resources. These findings contribute three important additions to the shared mental model construct: planning and preparation, risk assessment, and leadership. Shared mental models are crucial for patient safety because they enable VATS teams to anticipate problems through adaptive patterns of both implicit and explicit coordination. Copyright © 2017 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  15. Increasing Student-Learning Team Effectiveness with Team Charters

    Science.gov (United States)

    Hunsaker, Phillip; Pavett, Cynthia; Hunsaker, Johanna

    2011-01-01

    Because teams are a ubiquitous part of most organizations today, it is common for business educators to use team assignments to help students experientially learn about course concepts and team process. Unfortunately, students frequently experience a number of problems during team assignments. The authors describe the results of their research and…

  16. Effects of team emotional authenticity on virtual team performance

    Directory of Open Access Journals (Sweden)

    Catherine E Connelly

    2016-08-01

    Full Text Available Members of virtual teams lack many of the visual or auditory cues that are usually used as the basis for impressions about fellow team members. We focus on the effects of the impressions formed in this context, and use social exchange theory to understand how these impressions affect team performance. Our pilot study, using content analysis (n = 191 students, suggested that most individuals believe that they can assess others’ emotional authenticity in online settings by focusing on the content and tone of the messages. Our quantitative study examined the effects of these assessments. Structural equation modeling (SEM analysis (n = 81 student teams suggested that team-level trust and teamwork behaviors mediate the relationship between team emotional authenticity and team performance, and illuminate the importance of team emotional authenticity for team processes and outcomes.

  17. Sharing knowledge, being different and working as a team

    NARCIS (Netherlands)

    Rosendaal, B.W.

    2009-01-01

    Knowledge-intensive work in modern global organisations is largely organised in teams or groups. Most of this work can be classified as knowledge creation with outcomes such as plans, contracts, proposals and analyses. Cooperating for knowledge-intensive work is recognised as a social process in

  18. Measuring Team Learning Behaviours through Observing Verbal Team Interaction

    Science.gov (United States)

    Raes, Elisabeth; Boon, Anne; Kyndt, Eva; Dochy, Filip

    2015-01-01

    Purpose: This study aims to explore, as an answer to the observed lack of knowledge about actual team learning behaviours, the characteristics of the actual observed basic team learning behaviours and facilitating team learning behaviours more in-depth of three project teams. Over time, team learning in an organisational context has been…

  19. The Relationship between Management Team Size and Team Performance: The Mediating Effect of Team Psychological Safety

    OpenAIRE

    Midthaug, Mari Bratterud

    2017-01-01

    The purpose of this thesis is to explore the relationship between team size (number of team members) and team performance in management teams. There is a lack of empirical research exploring the potential links between these two elements within management teams. Further, little attention has been paid to potential mechanisms affecting this relationship. In this study, team psychological safety has been examined as a potential mediator in the size-performance relationship, hypothesizing that t...

  20. Managing Communication among Geographically Distributed Teams: A Brazilian Case

    Science.gov (United States)

    Almeida, Ana Carina M.; de Farias Junior, Ivaldir H.; de S. Carneiro, Pedro Jorge

    The growing demand for qualified professionals is making software companies opt for distributed software development (DSD). At the project conception, communication and synchronization of information are critical factors for success. However problems such as time-zone difference between teams, culture, language and different development processes among sites could difficult the communication among teams. In this way, the main goal of this paper is to describe the solution adopted by a Brazilian team to improve communication in a multisite project environment. The purposed solution was based on the best practices described in the literature, and the communication plan was created based on the infrastructure needed by the project. The outcome of this work is to minimize the impact of communication issues in multisite projects, increasing productivity, good understanding and avoiding rework on code and document writing.

  1. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  2. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  3. Proceedings of the second Atmospheric Radiation Measurement (ARM) Science Team Meeting

    International Nuclear Information System (INIS)

    1992-12-01

    The second Atmospheric Radiation Measurement (ARM) Science Team Meeting was held in Denver, Colorado, in October 1991. The five-day meeting provided a forum for a technical exchange among the members of the ARM Science Team and a discussion of the technical aspects of the project infrastructure. The meeting included several activities: Science Team presentations, discussions of the first site occupation plan, experiment design sessions, and poster sessions. This Proceedings document includes papers presented at the meeting. The papers included are those from the technical sessions, the experiment design sessions, the first site occupation, and descriptions of locales for future sites. Individual projects are processed separately for the database

  4. Restructuring Vocational Special Needs Education through Interdisciplinary Team Effort: Local Motion in the Pacific Basin.

    Science.gov (United States)

    Smith, Garnett J.; Stodden, Robert A.

    1994-01-01

    The Restructuring through Interdisciplinary Team Effort project focuses on changing the culture and structure of vocational special needs education in the Pacific Basin. Its three dimensions are cognitive core (best practices, outcome-focused design, strategic planning); team network of stakeholders; and systemic renewal (school-to-work…

  5. U.S. petroleum strategies in the decade of the environment

    International Nuclear Information System (INIS)

    Williams, B.

    1991-01-01

    The book offer guidance and recommendations for strategies in the coming decade, based on research, interviews, and almost a decade of specializing in reporting on environmental issues in the petroleum industry. Included will be a chapter on crisis management. This book contains the catalyst: Exxon Valdez spill; The More things change; The new consciousness; Government leads the way; New approaches; Natural gas: fuel of the future; Strategies for U.S. explorationists; Drilling production strategies; Transportation strategies; Strategies for refiners marketers; Petrochemicals and gas processing strategies; The public, media, and crisis management; Battle plans

  6. Leading Teams of Leaders: What Helps Team Member Learning?

    Science.gov (United States)

    Higgins, Monica; Young, Lissa; Weiner, Jennie; Wlodarczyk, Steven

    2010-01-01

    School districts are moving toward a new form of management in which superintendents need to form and nurture leadership teams. A study of 25 such teams in Connecticut suggests that a team's effectiveness is maximized when the team members are coached by other team members, not the superintendent, and when they are coached on task-related…

  7. Model Commissioning Plan and Guide Specifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  8. A Project Team: a Team or Just a Group?

    Directory of Open Access Journals (Sweden)

    Kateřina

    2014-06-01

    Full Text Available This paper deals with issues related to work in either teams or groups. The theoretical part discusses a team and a group with regards to its definition, classification and basic distinction, brings in more on the typology of team roles, personality assessment and sociometric methods. The analytical part tests the project (work team of a medical center represented in terms of personality and motivational types, team roles and interpersonal team relations concerning the willingness of cooperation and communication. The main objective of this work is to verify the validity of the assumptions that the analyzed team represents a very disparate group as for its composition from the perspective of personality types, types of motivation, team roles and interpersonal relations in terms of the willingness of cooperation and communication. A separate output shall focus on sociometric investigation of those team members where willingness to work together and communicate is based on the authors’ assumption of tight interdependence.

  9. The Team Up for School Nutrition Success workshop evaluation study: 3-month results

    Science.gov (United States)

    The purpose of this study was to evaluate the Team Up for School Nutrition Success pilot initiative, conducted by the Institute of Child Nutrition (ICN), on meeting the objectives of the individual action plans created by school food authorities (SFAs) during the workshop. The action plans could add...

  10. The Team Climate Inventory: application in hospital teams and methodological considerations.

    Science.gov (United States)

    Ouwens, M; Hulscher, M; Akkermans, R; Hermens, R; Grol, R; Wollersheim, H

    2008-08-01

    To test the validity, reliability and discriminating capacity of an instrument to assess team climate, the Team Climate Inventory (TCI), in a sample of Dutch hospital teams. The TCI is based on a four-factor theory of team climate for innovation. Validation study. Hospital teams in The Netherlands. 424 healthcare professionals; 355 nurses working in 22 nursing teams and 69 nurses and doctors working in 14 quality-improvement teams. Exploratory and confirmatory factor analyses, Pearson's product moment correlations, internal homogeneity of the TCI scales based on Cronbach alpha, and the TCI capability to discriminate between two types of healthcare teams, namely nursing teams and quality-improvement teams. The validity test revealed the TCI's five-factor structure and moderate data fit. The Cronbach alphas of the five scales showed acceptable reliabilities. The TCI discriminated between nursing teams and quality-improvement teams. The mean scores of quality-improvement teams were all significantly higher than those of the nursing teams. Patient care teams are essential for high-quality patient care, and team climate is an important characteristic of successful teams. This study shows that the TCI is a valid, reliable and discriminating self-report measure of team climate in hospital teams. The TCI can be used as a quality-improvement tool or in quality-of-care research.

  11. Team Psychological Safety and Team Learning: A Cultural Perspective

    Science.gov (United States)

    Cauwelier, Peter; Ribière, Vincent M.; Bennet, Alex

    2016-01-01

    Purpose: The purpose of this paper was to evaluate if the concept of team psychological safety, a key driver of team learning and originally studied in the West, can be applied in teams from different national cultures. The model originally validated for teams in the West is applied to teams in Thailand to evaluate its validity, and the views team…

  12. Management Teams

    CERN Document Server

    Belbin, R Meredith Meredith

    2012-01-01

    Meredith Belbin's work on teams has become part of everyday language in organizations all over the world. All kinds of teams and team behaviours are covered. At the end of the book is a self-perception inventory so that readers can match their own personalities to particular team roles. Management Teams is required reading for managers concerned with achieving results by getting the best from their key personnel.

  13. Strategic Planning for Hot Cell Closure

    International Nuclear Information System (INIS)

    LANGSTAFF, D.C.

    2001-01-01

    The United States Department of Energy (DOE) and its contractor were remediating a large hot cell complex to mitigate the radiological hazard. A Resource Conservation and Recovery Act (RCRA) closure unit was determined to be located within the complex. The regulator established a challenge to develop an acceptable closure plan on a short schedule (four months). The scope of the plan was to remove all excess equipment and mixed waste from the closure unit, establish the requirements of the legally binding Closure Plan and develop an acceptable schedule. The complex has several highly radioactive tanks, tank vaults, piping, and large hot cells containing complex chemical processing equipment. Driven by a strong need to develop an effective strategy to meet cleanup commitments, three principles were followed to develop an acceptable plan: (1) Use a team approach, (2) Establish a buffer zone to support closure, and (3) Use good practice when planning the work sequence. The team was composed of DOE, contractor, and Washington State Department of Ecology (Regulator) staff. The team approach utilized member expertise and fostered member involvement and communication. The buffer zone established an area between the unregulated parts of the building and the areas that were allegedly not in compliance with environmental standards. Introduction of the buffer zone provided simplicity, clarity, and flexibility into the process. Using good practice means using the DOE Integrated Safety Management Core Functions for planning and implementing work safely. Paying adequate attention to detail when the situation required contributed to the process credibility and a successful plan

  14. Virtual Team Governance: Addressing the Governance Mechanisms and Virtual Team Performance

    Science.gov (United States)

    Zhan, Yihong; Bai, Yu; Liu, Ziheng

    As technology has improved and collaborative software has been developed, virtual teams with geographically dispersed members spread across diverse physical locations have become increasingly prominent. Virtual team is supported by advancing communication technologies, which makes virtual teams able to largely transcend time and space. Virtual teams have changed the corporate landscape, which are more complex and dynamic than traditional teams since the members of virtual teams are spread on diverse geographical locations and their roles in the virtual team are different. Therefore, how to realize good governance of virtual team and arrive at good virtual team performance is becoming critical and challenging. Good virtual team governance is essential for a high-performance virtual team. This paper explores the performance and the governance mechanism of virtual team. It establishes a model to explain the relationship between the performance and the governance mechanisms in virtual teams. This paper is focusing on managing virtual teams. It aims to find the strategies to help business organizations to improve the performance of their virtual teams and arrive at the objectives of good virtual team management.

  15. Putting the "Team" in the Fine Arts Team: An Application of Business Management Team Concepts

    Science.gov (United States)

    Fisher, Ryan

    2007-01-01

    In this article, the author discusses current challenges to the idea of teamwork in fine arts teams, redefines the terms team and collaboration using a business management perspective, discusses the success of effective teams in the business world and the characteristics of those teams, and proposes the implementation of the business model of…

  16. A Project Team: A Team or Just a Group?

    Directory of Open Access Journals (Sweden)

    Katerina Hrazdilova Bockova

    2013-11-01

    Full Text Available This paper deals with issues related to work in either teams or groups. The theoretical part which discusses a team and a group with regards to its definition, classification and basic distinction brings in more on the typology of team roles, personality assessment and sociometric methods. The analytical part tests the project (work team of a medical center represented in terms of personality and motivational types, team roles and interpersonal team relations concerning the willingness of cooperation and communication. The main objective of this work was to determine whether the existing team is not by its nature rather a working group that contributes to the generally perceived stagnation of that field.

  17. Geospatial Information Response Team

    Science.gov (United States)

    Witt, Emitt C.

    2010-01-01

    Extreme emergency events of national significance that include manmade and natural disasters seem to have become more frequent during the past two decades. The Nation is becoming more resilient to these emergencies through better preparedness, reduced duplication, and establishing better communications so every response and recovery effort saves lives and mitigates the long-term social and economic impacts on the Nation. The National Response Framework (NRF) (http://www.fema.gov/NRF) was developed to provide the guiding principles that enable all response partners to prepare for and provide a unified national response to disasters and emergencies. The NRF provides five key principles for better preparation, coordination, and response: 1) engaged partnerships, 2) a tiered response, 3) scalable, flexible, and adaptable operations, 4) unity of effort, and 5) readiness to act. The NRF also describes how communities, tribes, States, Federal Government, privatesector, and non-governmental partners apply these principles for a coordinated, effective national response. The U.S. Geological Survey (USGS) has adopted the NRF doctrine by establishing several earth-sciences, discipline-level teams to ensure that USGS science, data, and individual expertise are readily available during emergencies. The Geospatial Information Response Team (GIRT) is one of these teams. The USGS established the GIRT to facilitate the effective collection, storage, and dissemination of geospatial data information and products during an emergency. The GIRT ensures that timely geospatial data are available for use by emergency responders, land and resource managers, and for scientific analysis. In an emergency and response capacity, the GIRT is responsible for establishing procedures for geospatial data acquisition, processing, and archiving; discovery, access, and delivery of data; anticipating geospatial needs; and providing coordinated products and services utilizing the USGS' exceptional pool of

  18. Improving reliability in south Ajax with IntelliTEAM

    Energy Technology Data Exchange (ETDEWEB)

    Starck, A.P. [Veridian Connections Inc., Ajax, ON (Canada)

    2010-07-01

    Veridian Connections Incorporated is a local electricity distribution company in Ontario that is faced with end of life feeder cables and an aging system. Most of the feeders are combined overhead and underground cables supplied from several substations with a limited transfer capability. The commercial activity in the utility's service area is intolerant to sustained outages. Although the initial plan was to replace the cables, capital and time constraints led the utility to chose the IntelliTEAM 2 system to improve reliability, by reducing the frequency, duration and impact of outages. The unique system is based on submersible switchgear, PulseClosing and includes the substation breakers as IntelliTEAM devices. The current plan to implement a smart grid turns sustained outages into momentary outages; reduces the number of customers affected by a sustained failure; improves the ability to transfer loads; and reduces stresses on aged cables. The self healing system restores customers in less than a minute and provides visibility to SCADA operators through a high speed SpeedNet radio system. tabs., figs.

  19. Case management: a randomized controlled study comparing a neighborhood team and a centralized individual model.

    OpenAIRE

    Eggert, G M; Zimmer, J G; Hall, W J; Friedman, B

    1991-01-01

    This randomized controlled study compared two types of case management for skilled nursing level patients living at home: the centralized individual model and the neighborhood team model. The team model differed from the individual model in that team case managers performed client assessments, care planning, some direct services, and reassessments; they also had much smaller caseloads and were assigned a specific catchment area. While patients in both groups incurred very high estimated healt...

  20. Geometric Reasoning for Automated Planning

    Science.gov (United States)

    Clement, Bradley J.; Knight, Russell L.; Broderick, Daniel

    2012-01-01

    An important aspect of mission planning for NASA s operation of the International Space Station is the allocation and management of space for supplies and equipment. The Stowage, Configuration Analysis, and Operations Planning teams collaborate to perform the bulk of that planning. A Geometric Reasoning Engine is developed in a way that can be shared by the teams to optimize item placement in the context of crew planning. The ISS crew spends (at the time of this writing) a third or more of their time moving supplies and equipment around. Better logistical support and optimized packing could make a significant impact on operational efficiency of the ISS. Currently, computational geometry and motion planning do not focus specifically on the optimized orientation and placement of 3D objects based on multiple distance and containment preferences and constraints. The software performs reasoning about the manipulation of 3D solid models in order to maximize an objective function based on distance. It optimizes for 3D orientation and placement. Spatial placement optimization is a general problem and can be applied to object packing or asset relocation.

  1. Employee Knowledge Sharing in Work Teams: Effects of Team Diversity, Emergent States, and Team Leadership

    Science.gov (United States)

    Noh, Jae Hang

    2013-01-01

    Knowledge sharing in work teams is one of the critical team processes. Without sharing of knowledge, work teams and organizations may not be able to fully utilize the diverse knowledge brought into work teams by their members. The purpose of this study was to investigate antecedents and underlying mechanisms influencing the extent to which team…

  2. The history of Korea electric times for four decades

    International Nuclear Information System (INIS)

    2004-11-01

    This book reports the history of Korea electric times for four decades, which is comprised of six parts, it deals with establishment of electric times and organizational systems and an editorial policy, status and pains for rebirth, open up new future, foundation of growth for the electric times, stability of organization extension of organization, establishing independent corporation, carrying out a radical reform, changing reading newspaper into seeing newspaper, ensuring internal stability, for the daily newspaper, development of contents on power industry technology, strategy for specialization, plan for campaign for patriotism, major business for four decades, today's electric times newspaper and future, and electric times years through the paper.

  3. The Team up for School Nutrition Success Workshop Evaluation Study: Three Month Results

    Science.gov (United States)

    Cullen, Karen Weber; Rushing, Keith

    2017-01-01

    Purpose/Objectives: The purpose of this study was to evaluate the "Team Up for School Nutrition Success" pilot initiative, conducted by the Institute of Child Nutrition (ICN), on meeting the objectives of the individual action plans created by school food authorities (SFAs) during the workshop. The action plans could address improving…

  4. [Investigation of team processes that enhance team performance in business organization].

    Science.gov (United States)

    Nawata, Kengo; Yamaguchi, Hiroyuki; Hatano, Toru; Aoshima, Mika

    2015-02-01

    Many researchers have suggested team processes that enhance team performance. However, past team process models were based on crew team, whose all team members perform an indivisible temporary task. These models may be inapplicable business teams, whose individual members perform middle- and long-term tasks assigned to individual members. This study modified the teamwork model of Dickinson and McIntyre (1997) and aimed to demonstrate a whole team process that enhances the performance of business teams. We surveyed five companies (member N = 1,400, team N = 161) and investigated team-level-processes. Results showed that there were two sides of team processes: "communication" and "collaboration to achieve a goal." Team processes in which communication enhanced collaboration improved team performance with regard to all aspects of the quantitative objective index (e.g., current income and number of sales), supervisor rating, and self-rating measurements. On the basis of these results, we discuss the entire process by which teamwork enhances team performance in business organizations.

  5. Aerospace Concurrent Engineering Design Teams: Current State, Next Steps and a Vision for the Future

    Science.gov (United States)

    Hihn, Jairus; Chattopadhyay, Debarati; Karpati, Gabriel; McGuire, Melissa; Borden, Chester; Panek, John; Warfield, Keith

    2011-01-01

    Over the past sixteen years, government aerospace agencies and aerospace industry have developed and evolved operational concurrent design teams to create novel spaceflight mission concepts and designs. These capabilities and teams, however, have evolved largely independently. In today's environment of increasingly complex missions with limited budgets it is becoming readily apparent that both implementing organizations and today's concurrent engineering teams will need to interact more often than they have in the past. This will require significant changes in the current state of practice. This paper documents the findings from a concurrent engineering workshop held in August 2010 to identify the key near term improvement areas for concurrent engineering capabilities and challenges to the long-term advancement of concurrent engineering practice. The paper concludes with a discussion of a proposed vision for the evolution of these teams over the next decade.

  6. Perspectives of planning from the point of view of professional Family Health Strategy.

    Directory of Open Access Journals (Sweden)

    Polyana da Costa RIBEIRO

    2015-02-01

    Full Text Available The article looks at similarities and differences of the community diagnosis within the local planning of family health teams in Teresina. Was based on case study and focus group with teams belonging to the same territorial basis, involving hospital, health center of urban and rural area. Discusses three analytical dimensions: planning process, diagnosis in the planning of health teams and facilities/limits. It was evidenced that the planning is in its incipient, short-term, individualized and unsatisfactory demand needs. The interventions of the social actors have not involved sustainable actions, reflecting the verticality of the programmes and of distortions in the deployment process of the teams. Urge vigilance to managers with the organizational foundation of primary care, which is the diagnosis, in addition to implementing strategies for men’s health, adolescent, bedridden and caregivers and collective education, neglected.

  7. Individual and team performance in team-handball: a review.

    Science.gov (United States)

    Wagner, Herbert; Finkenzeller, Thomas; Würth, Sabine; von Duvillard, Serge P

    2014-12-01

    Team handball is a complex sport game that is determined by the individual performance of each player as well as tactical components and interaction of the team. The aim of this review was to specify the elements of team-handball performance based on scientific studies and practical experience, and to convey perspectives for practical implication. Scientific studies were identified via data bases of PubMed, Web of Knowledge, SPORT Discus, Google Scholar, and Hercules. A total of 56 articles met the inclusion criteria. In addition, we supplemented the review with 13 additional articles, proceedings and book sections. It was found that the specific characteristics of team-handball with frequent intensity changes, team-handball techniques, hard body confrontations, mental skills and social factors specify the determinants of coordination, endurance, strength and cognition. Although we found comprehensive studies examining individual performance in team-handball players of different experience level, sex or age, there is a lack of studies, particularly for team-handball specific training, as well as cognition and social factors. Key PointsThe specific characteristics of team-handball with frequent intensity changes, specific skills, hard body confrontations, mental skills and social factors define the determinants of coordination, endurance, strength and cognition.To increase individual and team performance in team-handball specific training based on these determinants have been suggested.Although there are comprehensive studies examining individual performance in team-handball players of different experience level, sex, or age are published, there is a lack of training studies, particularly for team-handball specific techniques and endurance, as well as cognition and social factors.

  8. "That's not how we do it": managing the inherited medical practice team.

    Science.gov (United States)

    Hills, Laura

    2013-01-01

    Most medical practice managers who take a new job will inherit an existing team. Those first few days on the job are critical because they can determine whether or not the new manager will succeed. This article provides a game plan for new medical practice managers so they get off on the right foot with their inherited teams. It suggests strategies for learning about the team's culture and for demonstrating visibly that there is a new manager in the job. It offers guidelines about introducing the new manager to the inherited team, discussing past experiences, and establishing new expectations. This article further provides practical tips for serving as a role model, gaining allies, and dealing with troublemakers quickly and effectively. It suggests strategies for speaking about the previous practice manager and for creating excitement with the inherited team. Finally, this article offers a set of 15 questions a new manager can ask members of the inherited team to get to know them, an additional 25-point team assessment instrument, and a step-by-step strategy for raising the bar for mediocre, lackluster, or dysfunctional inherited teams.

  9. Interdisciplinary team care of cleft lip and palate: social and psychological aspects.

    Science.gov (United States)

    Strauss, R P; Broder, H

    1985-10-01

    The organizational example of a university-based team and two patient case studies illustrate how team interaction affects decision making. The model presented for effective team organization is an egalitarian one. Interdependency, flexibility, and open communication among members are essential. Cleft lip and palate teams provide evaluation and treatment that include input from a variety of professional disciplines. The team context makes it possible for care to be coordinated and alleviates the fragmentation of seeking treatment from several independent specialists. Teams also have a special opportunity to address the complex social and psychological issues prevalent in treating persons with birth defects. Specialists, like psychologists and social workers, identify these issues so that surgeons, dentists, and other clinicians may provide a comprehensive treatment plan and management approach. If psychologists or social workers are not available to a team, the group may still successfully integrate a variety of social and personal factors into their decision making. Examples of problem areas and of issues that may be associated with difficulties in adjusting to cleft therapy are included in this article. Teams that effectively address the psychosocial needs of their patients will enhance patient satisfaction, cooperation, and treatment outcomes.

  10. The Behavior Intervention Support Team (BIST) Program: Underlying Theories

    Science.gov (United States)

    Boulden, Walter T.

    2010-01-01

    The Behavior Intervention Support Team (BIST) is a proactive school-wide behavior management plan for all students, emphasizing schools partnering with students and parents through caring relationships and high expectations. The BIST program is well-grounded in behavioral theory and combines strength-based and resiliency principles within the…

  11. The effects on team emotions and team effectiveness of coaching in interprofessional health and social care teams.

    Science.gov (United States)

    Dimas, Isabel Dórdio; Renato Lourenço, Paulo; Rebelo, Teresa

    2016-07-01

    The purpose of this study was to examine the effects of coaching behaviours provided by peers and by the leader on the emotions experienced by interprofessional health and social care teams and on members' satisfaction with the team, as well as on team performance. Data were obtained from a survey among 344 employees working in 52 interprofessional health and social care teams from nine Portuguese organizations. The results show that leader coaching and peer coaching have a positive effect on the level of team members' satisfaction with the team and on positive emotions, and a negative effect on negative emotions. Furthermore, coaching provided by peers presents a positive effect on team performance as assessed by the leader of the team. Our findings put forward the importance of engaging in coaching behaviours to promote quality of the team experience, as well as the achievement of team performance objectives. Further studies should explore how coaching behaviours impact the patient, whose well-being is the ultimate objective of a team in the health and social care system, namely in terms of the patient's perception of quality care or patient outcomes.

  12. The challenge of executive team building in the aftermath of a hostile takeover

    International Nuclear Information System (INIS)

    Scott, R. G.

    1997-01-01

    In a hostile takeover, the executives of the acquired company are likely to have strong feelings that they may be unwanted by and considered disloyal to the the new company. They are likely to be filled with a sense that the 'new company' will 'get even with them' for the resistance put up to the merger. Therefore, the new company must be conscious of and sensitive to the fact that a strained environment exists and one of its first priorities should be to reduce that strain. Experience shows that a well informed Transition Team can minimize the emotional impacts of a hostile takeover and contribute significantly to the eventual success of the merger. To assure success, the Transition Team should be appointed early in the negotiating phase. It should have ready access to the negotiating team and the CEO to keep them fully informed of risk management issues caused by human resource. It should be involved in the strategic planning process during the pre-merger stage. It should have major responsibility for developing human resource impact studies, the development of organizational structure, the integration and implementation planning and monitoring of the progress of implementation. A list of Transition Team responsibilities and a list of proven techniques for turning a hostile environment into a productive win/win team environment are also included

  13. Teaming up

    DEFF Research Database (Denmark)

    Warhuus, Jan; Günzel-Jensen, Franziska; Robinson, Sarah

    2016-01-01

    types of team formation: random teacher pre-assigned, student selection, and teacher directed diversity. In each of these modules, ethnographic methods (interviews and observations) were employed. Additionally, we had access to students learning logs, formative and summative assessments, and final exams...... functioning entrepreneurial student teams as most teams lack personal chemistry which makes them anchor their work too much in a pre-defined project. In contrast, we find that students that can form their own teams aim for less diverse teams than what is achieved by random assignment. However, the homophily......Questions we care about (Objectives): When students have to work on challenging tasks, as it is often the case in entrepreneurship classrooms that leverage experiential learning, team success becomes central to the students learning. Yet, the formation of teams is often left up to the students...

  14. A case study of strategic planning IFB

    Directory of Open Access Journals (Sweden)

    Pedro Henrique Rodrigues de Camargo Dias

    2018-03-01

    Full Text Available The purpose of this article is to identify and characterize the initial stage of the IFB strategic planning, based on the perception of top management and planning team. The case study adopts a qualitative approach supported by bibliographic research techniques, to build a theoretical foundation, allied to the semistructure interview for later, application of the content analysis. As a result, we can identify that the institution opted to first define the strategic references, based on the construction of the mission, vision and values, and later, analysis of the organizational diagnosis, based on the Balanced Scorecard methodology. It was verified that the tool of strategic planning and its use are points that need to be better understood by the managers and technical planning team. The predominant characteristics of strategic planning are composed of a programmatic tool for projecting medium and long term goals and actions, of legal compliance, as it integrates and operationalizes the Institutional Development Plan (PDI.

  15. Educational leadership during a decade of medical curricular innovation and renewal.

    Science.gov (United States)

    Pinder, Karen E; Shabbits, Jennifer A

    2018-03-05

    The past decade has witnessed successful expansion, distribution and curricular renewal at the University of British Columbia (UBC) medical school. The expansion and distribution of the medical program doubled enrollment and established the first North American medical school training students across multiple geographical locations. The more recent competency-based curriculum renewal demonstrates sustained innovation within UBC medicine. This paper describes that a significant contributor to these successes has been a team of teaching faculty whose exclusive roles have been providing curricular support. Over the past decade, this group has evolved into a vital component of the day-to-day operations and performance of the distributed medical curriculum; they now provide continuity in leadership and innovation across multiple educational facets of the program. This paper reports on the evolution and significance of these faculty members. The descriptions establish the success of an investment in teaching faculty and underscore the importance of engaging faculty whose primary commitments are to teaching, educational pedagogy, and student support. This efficacious model of supporting and advancing a complex distributed medical program over more than a decade of pivotal change will be of interest to faculties and programs that are contemplating or navigating similar pursuits.

  16. The Department of Energy Tiger Teams; analysis of findings and plans for the future

    International Nuclear Information System (INIS)

    Ziemer, P.L.

    1992-01-01

    Since mid-1989, the Department of Energy (DOE) has used 'Tiger Teams' to provide independent oversight and assessments of the compliance and management of environment, safety, and health programs in DOE facilities. These assessments have provided the Secretary of Energy with not only the current compliance status of each facility together with the associated vulnerabilities, but also have identified root causes for noncompliance. By mid-1992, Tiger Team assessments will be completed for all major DOE facilities (production, research, and testing facilities) as well as a number of smaller or less complex sites. (author)

  17. What are the critical success factors for team training in health care?

    Science.gov (United States)

    Salas, Eduardo; Almeida, Sandra A; Salisbury, Mary; King, Heidi; Lazzara, Elizabeth H; Lyons, Rebecca; Wilson, Katherine A; Almeida, Paula A; McQuillan, Robert

    2009-08-01

    Ineffective communication among medical teams is a leading cause of preventable patient harm throughout the health care system. A growing body of literature indicates that medical teamwork improves the quality, safety, and cost-effectiveness of health care delivery, and expectations for teamwork in health care have increased. Yet few health care professions' curricula include teamwork training, and few medical practices integrate teamwork principles. Because of this knowledge gap, growing numbers of health care systems are requiring staff to participate in formal teamwork training programs. Seven evidence-based, practical, systematic success factors for preparing, implementing, and sustaining a team training and performance improvement initiative were identified. Each success factor is accompanied by tips for deployment and a real-world example of application. (1) Align team training objectives and safety aims with organizational goals, (2) provide organizational support for the team training initiative, (3) get frontline care leaders on board, (4) prepare the environment and trainees for team training, (5) determine required resources and time commitment and ensure their availability, (6) facilitate application of trained teamwork skills on the job; and (7) measure the effectiveness of the team training program. Although decades of research in other high-risk organizations have clearly demonstrated that properly designed team training programs can improve team performance, success is highly dependent on organizational factors such as leadership support, learning climate, and commitment to data-driven change. Before engaging in a teamwork training initiative, health care organizations should have a clear understanding of these factors and the strategies for their establishment.

  18. Good ergonomics and team diversity reduce absenteeism and errors in car manufacturing.

    Science.gov (United States)

    Fritzsche, Lars; Wegge, Jürgen; Schmauder, Martin; Kliegel, Matthias; Schmidt, Klaus-Helmut

    2014-01-01

    Prior research suggests that ergonomics work design and mixed teams (in age and gender) may compensate declines in certain abilities of ageing employees. This study investigates simultaneous effects of both team level factors on absenteeism and performance (error rates) over one year in a sample of 56 car assembly teams (N = 623). Results show that age was related to prolonged absenteeism and more mistakes in work planning, but not to overall performance. In comparison, high-physical workload was strongly associated with longer absenteeism and increased error rates. Furthermore, controlling for physical workload, age diversity was related to shorter absenteeism, and the presence of females in the team was associated with shorter absenteeism and better performance. In summary, this study suggests that both ergonomics work design and mixed team composition may compensate age-related productivity risks in manufacturing by maintaining the work ability of older employees and improving job quality.

  19. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  20. Science Planning and Orbit Classification for Solar Probe Plus

    Science.gov (United States)

    Kusterer, M. B.; Fox, N. J.; Rodgers, D. J.; Turner, F. S.

    2016-12-01

    There are a number of challenges for the Science Planning Team (SPT) of the Solar Probe Plus (SPP) Mission. Since SPP is using a decoupled payload operations approach, tight coordination between the mission operations and payload teams will be required. The payload teams must manage the volume of data that they write to the spacecraft solid-state recorders (SSR) for their individual instruments for downlink to the ground. Making this process more difficult, the geometry of the celestial bodies and the spacecraft during some of the SPP mission orbits cause limited uplink and downlink opportunities. The payload teams will also be required to coordinate power on opportunities, command uplink opportunities, and data transfers from instrument memory to the spacecraft SSR with the operation team. The SPT also intend to coordinate observations with other spacecraft and ground based systems. To solve these challenges, detailed orbit activity planning is required in advance for each orbit. An orbit planning process is being created to facilitate the coordination of spacecraft and payload activities for each orbit. An interactive Science Planning Tool is being designed to integrate the payload data volume and priority allocations, spacecraft ephemeris, attitude, downlink and uplink schedules, spacecraft and payload activities, and other spacecraft ephemeris. It will be used during science planning to select the instrument data priorities and data volumes that satisfy the orbit data volume constraints and power on, command uplink and data transfer time periods. To aid in the initial stages of science planning we have created an orbit classification scheme based on downlink availability and significant science events. Different types of challenges arise in the management of science data driven by orbital geometry and operational constraints, and this scheme attempts to identify the patterns that emerge.

  1. Cheap Talk: “Team Factors and Management Practices Influence on Team Trust”

    OpenAIRE

    Doris Padmini Selvaratnam; Aini Aman; Muhamad Maziz Mahyuddin Bin Kamaludin; Gary Lynn; Richard Reilly

    2016-01-01

    Team trust has been cited as a contributing factor towards team performance. This paper looks at the antecedents of team trust and to what extent they influence team trust. The antecedents of team trust are team factors like team autonomy, team stability and team member experience; and the management practices are top management involvement and management support. The results demonstrated that team factors and management practices influence team trust individually. The key find...

  2. Performance of district disaster management teams after undergoing an operational level planners' training in Uganda.

    Science.gov (United States)

    Orach, Christopher Garimol; Mayega, Roy William; Woboya, Vincent; William, Bazeyo

    2013-06-01

    Uganda is vulnerable to several natural, man-made and a hybrid of disasters including drought, famine, floods, warfare, and disease outbreaks. We assessed the district disaster team's performance, roles and experiences following the training. The disasters most commonly experienced by the district teams were epidemics of diseases in humans (7 of 12), animals (epizoonotics) (3 of 12) and crops (3 of 12); hailstorms and floods (3 of 12). The capabilities viewed most useful for management of disasters were provision of health care services (9/12) and response management (8 of 12). The capability domains most often consulted during the disasters were general response management (31%), health services (29%) and water and sanitation (17%). The skills areas perceived to be vital following the training were response to epidemics 10/12, disaster management planning 8/12, hazards and vulnerability analysis 7/12 and principles of disaster planning 7/12 respectively. Main challenges mentioned by district teams were inadequacy of finance and logistics, lack of commitment by key partners towards disaster preparedness and response. The most common disaster experienced disasters related to outbreaks of diseases in man, animals and crops. The most frequently applied capabilities were response management and provision of emergency health services. The activities most frequently implemented following disaster management teams training were conducting planning meetings, refinement of plans and dissemination of skills gained. The main challenges were related to limited budget allocations and legal frameworks for disaster management that should be addressed by both central and local governments.

  3. Restructuring: A School-Based Plan of Action.

    Science.gov (United States)

    Rothberg, Robert A.; Bozeman, William C.

    The processes by which school leaders can institutionalize staff and organizational development, with a focus on initiating school restructuring through team development, are described. Three features are necessary for implementing school restructuring through team development: a deliberate plan for staff involvement, a positive work environment,…

  4. Summary of Prioritized Research Opportunities. Building America Planning Meeting, November 2-4, 2010

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2011-02-01

    This report outlines the results of brainstorming sessions conducted at the Building America Fall 2010 planning meeting, in which research teams and national laboratories identified key research priorities to incorporate into multi-year planning, team research agendas, expert meetings, and technical standing committees.

  5. On-call emergency workload of a general surgical team.

    Science.gov (United States)

    Jawaid, Masood; Raza, Syed Muhammad; Alam, Shams Nadeem; Manzar, S

    2009-01-01

    To examine the on-call emergency workload of a general surgical team at a tertiary care teaching hospital to guide planning and provision of better surgical services. During six months period from August to January 2007; all emergency calls attended by general surgical team of Surgical Unit II in Accident and Emergency department (A and E) and in other units of Civil, Hospital Karachi, Pakistan were prospectively recorded. Data recorded includes timing of call, diagnosis, operation performed and outcome apart from demography. Total 456 patients (326 males and 130 females) were attended by on-call general surgery team during 30 emergency days. Most of the calls, 191 (41.9%) were received from 8 am to 5 pm. 224 (49.1%) calls were of abdominal pain, with acute appendicitis being the most common specific pathology in 41 (9.0%) patients. Total 73 (16.0%) calls were received for trauma. Total 131 (28.7%) patients were admitted in the surgical unit for urgent operation or observation while 212 (46.5%) patients were discharged from A and E. 92 (20.1%) patients were referred to other units with medical referral accounts for 45 (9.8%) patients. Total 104 (22.8%) emergency surgeries were done and the most common procedure performed was appendicectomy in 34 (32.7%) patients. Major workload of on-call surgical emergency team is dealing with the acute conditions of abdomen. However, significant proportion of patients are suffering from other conditions including trauma that require a holistic approach to care and a wide range of skills and experience. These results have important implications in future healthcare planning and for the better training of general surgical residents.

  6. Executive Order 13693: Planning for Federal Sustainability in the Next Decade; Guidance for Federal Agencies on Executive Order 13693 -- Federal Fleet Management

    Energy Technology Data Exchange (ETDEWEB)

    2017-01-01

    The U.S. Department of Energy (DOE) and U.S. General Services Administration (GSA) are issuing comprehensive guidance on the federal fleet requirements of Executive Order (E.O.) 13693, Planning for Federal Sustainability in the Next Decade (E.O. 13693), to help federal agencies subject to the executive order develop an overall approach for reducing total fleet greenhouse gas (GHG) emissions and fleet-wide per-mile GHG emissions, and ensure the approach helps these agencies meet their requirements. Three key GHG emissions reduction strategies - right-sizing fleets to mission, increasing fleet fuel efficiency, and displacing petroleum with alternative fuel use - are essential to meeting the requirements and are discussed further in this document. This guidance document is intended to help agency Chief Sustainability Officers (CSOs) and headquarters fleet managers craft tailored executable plans that achieve the purpose of E.O. 13693. The guidance will assist agencies in completing the first phase of a comprehensive fleet management framework by identifying the strategies each agency will then implement to meet or exceed its requirements.

  7. University of Louisville Holds Fast to Plans for Big-Time Sports

    Science.gov (United States)

    Sander, Libby

    2009-01-01

    For five decades, the University of Louisville men's basketball team has played its home games at the state's fairgrounds, in a modest arena originally built for horse shows. And for just as many seasons, the team's toughest competition for scheduling has come from the livestock--and the flea markets and tractor pulls that also vie for the space.…

  8. Planning and Evaluation by Canadian Civil Society Organizations ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Planning and Evaluation by Canadian Civil Society Organizations : Bridging Gaps ... Specifically, the research team will assess the various planning, monitoring ... International Water Resources Association, in close collaboration with IDRC, ...

  9. An Examination of Leadership Types among Generation Y and Its Impact on Virtual Team Effectiveness

    Science.gov (United States)

    Graham, C. Matt

    2013-01-01

    The majority of database system development projects end in failure. Reasons that include, the system not being developed on time, the system was developed over budget, and the system developed did not meet the planned project's criteria. These failures are compounded by the use of virtual teams which includes problems with team formation, the…

  10. IAEA Operational Safety Team (OSART) Reviews Progress at Fessenheim Nuclear Power Plant, France

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has evaluated the French Nuclear Power Plant (NPP) at Fessenheim to assess how the facility has followed up on an Operational Safety Review Team (OSART) mission undertaken in 2009. The IAEA assembled a team of experts at the request of the Government of France to conduct the mission. Follow-up missions are standard components of the OSART programme and are conducted 18-24 months after the initial OSART mission. Under the leadership of the IAEA's Division of Nuclear Installation Safety, the team performed its review from 7 to 11 February 2011. The team assessed how the Fessenheim NPP has addressed the recommendations and suggestions made during the 2009 OSART mission. The team was made up of experts from Slovakia, Switzerland and the IAEA. The review covered the areas of Management, Organization and Administration; Training and Qualifications; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry and Emergency Planning and Preparedness. The conclusions of the follow-up review are based on the IAEA's Safety Standards and proven good international practices. There were 21 issues raised by the 2009 mission. During the follow-up mission, the team assessed that six issues had been resolved, thirteen had made satisfactory progress to date and two had made insufficient progress to date. 'Resolved' describes action plans for improvement that have been fully implemented; 'satisfactory progress to date' describes action plans that have been developed but are not yet fully implemented; and 'insufficient progress to date' describes situations where additional consideration or strengthening of improvement plans is necessary. Examples of issues falling into different resolution categories include: The plant has resolved the suggestion to establish a process to review initial training materials on a regular basis

  11. Team contracts at the Gorlovskuglestroi organization

    Energy Technology Data Exchange (ETDEWEB)

    Vasil' ev, A.Z.

    1984-08-01

    Details are given of successes achieved in mine drivage under the team contract system at Artemugol' mines. Of 43 drivage teams, 15 are working with this system. In 1983 plan figures were generally exceeded. In one mine, the new system led to an increase from 48 to 73 m/month in average drivage rates. Production per man per shift rose from 1.04 to 1.5 m/sup 3/. These increases were partly due to use of a spiral cut for explosive fracturing, BU-1 drilling units and PPN-4 loaders. More efficient work organization led to the elimination of absenteeism and a decrease in consumption of materials and compressed air. Concrete forms were used 4-5 times instead of twice, and drill bits sharpened up to 5 times. Drawbacks to the system include cumbersome accounting procedures and the need for frequent amendments to contracts.

  12. How Communication Among Members of the Health Care Team Affects Maternal Morbidity and Mortality.

    Science.gov (United States)

    Brennan, Rita Allen; Keohane, Carol Ann

    In the United States, rates of severe maternal morbidity and mortality have escalated in the past decade. Communication failure among members of the health care team is one associated factor that can be modified. Nurses can promote effective communication. We provide strategies that incorporate team training principles and structured communication processes for use by providers and health care systems to improve the quality and safety of patient care and reduce the incidence of maternal mortality and morbidity. Copyright © 2016 AWHONN, the Association of Women’s Health, Obstetric and Neonatal Nurses. Published by Elsevier Inc. All rights reserved.

  13. Team Leadership and Cancer End-of-Life Decision Making.

    Science.gov (United States)

    Waldfogel, Julie M; Battle, Dena J; Rosen, Michael; Knight, Louise; Saiki, Catherine B; Nesbit, Suzanne A; Cooper, Rhonda S; Browner, Ilene S; Hoofring, Laura H; Billing, Lynn S; Dy, Sydney M

    2016-11-01

    End-of-life decision making in cancer can be a complicated process. Patients and families encounter multiple providers throughout their cancer care. When the efforts of these providers are not well coordinated in teams, opportunities for high-quality, longitudinal goals of care discussions can be missed. This article reviews the case of a 55-year-old man with lung cancer, illustrating the barriers and missed opportunities for end-of-life decision making in his care through the lens of team leadership, a key principle in the science of teams. The challenges demonstrated in this case reflect the importance of the four functions of team leadership: information search and structuring, information use in problem solving, managing personnel resources, and managing material resources. Engaging in shared leadership of these four functions can help care providers improve their interactions with patients and families concerning end-of-life care decision making. This shared leadership can also produce a cohesive care plan that benefits from the expertise of the range of available providers while reflecting patient needs and preferences. Clinicians and researchers should consider the roles of team leadership functions and shared leadership in improving patient care when developing and studying models of cancer care delivery.

  14. Mission possible: Building an effective business continuity team in seven steps.

    Science.gov (United States)

    Porter, David

    2016-01-01

    Several books and studies exist on the creation, development and benefits of high-performing teams; many others offer insights into the business continuity management (BCM) discipline, crisis response and planning. Very rarely, however, do they cover both. This paper will explore the seven main development areas that helped build the foundation for a successful and high-performing BCM team in the Australian Taxation Office. Practical, actionable advice will be provided, recognising that the task for those starting out can be quite daunting and complex.

  15. Cohesion in Online Student Teams versus Traditional Teams

    Science.gov (United States)

    Hansen, David E.

    2016-01-01

    Researchers have found that the electronic methods in use for online team communication today increase communication quality in project-based work situations. Because communication quality is known to influence group cohesion, the present research examined whether online student project teams are more cohesive than traditional teams. We tested…

  16. Observations and lessons learnt from more than a decade of water safety planning in South-East Asia.

    Science.gov (United States)

    Sutherland, David

    2017-09-01

    In many countries of the World Health Organization (WHO) South-East Asia Region, drinking water is not used directly from the tap and faecal contamination of water sources is prevalent. As reflected in Sustainable Development Goal 6, access to safer drinking water is one of the most successful ways of preventing disease. The WHO Water Safety Framework promotes the use of water safety plans (WSPs), which are structured tools that help identify and mitigate potential risks throughout a water-supply system, from the water source to the point of use. WSPs not only help prevent outbreaks of acute and chronic waterborne diseases but also improve water-supply management and performance. During the past 12 years, through the direct and indirect work of a water quality partnership supported by the Australian Government, more than 5000 urban and rural WSPs have been implemented in the region. An impact assessment based on pre- and post-WSP surveys suggests that WSPs have improved system operations and management, infrastructure and performance; leveraged donor funds; increased stakeholder communication and collaboration; increased testing of water quality; and increased monitoring of consumer satisfaction. These achievements, and their sustainability, are being achieved through national legislation and regulatory frameworks for water supply, including quality standards for drinking water; national training tools and extensive training of sector professionals and creation of WSP experts; model WSPs; WSP auditing systems; and the institution of longterm training and support. More than a decade of water safety planning using the WSP approach has shown that supplying safe drinking water at the tap throughout the WHO South-East Asia Region is a realistic goal.

  17. Structured nursing communication on interdisciplinary acute care teams improves perceptions of safety, efficiency, understanding of care plan and teamwork as well as job satisfaction

    Directory of Open Access Journals (Sweden)

    Gausvik C

    2015-01-01

    Full Text Available Christian Gausvik,1 Ashley Lautar,2 Lisa Miller,2 Harini Pallerla,3 Jeffrey Schlaudecker4,5 1University of Cincinnati College of Medicine, 2The Christ Hospital, Cincinnati, OH, USA; 3Department of Family and Community Medicine, 4Division of Geriatric Medicine, University of Cincinnati, Cincinnati, OH, USA; 5Geriatric Medicine Fellowship Program, University of Cincinnati/The Christ Hospital, Cincinnati, OH, USA Abstract: Efficient, accurate, and timely communication is required for quality health care and is strongly linked to health care staff job satisfaction. Developing ways to improve communication is key to increasing quality of care, and interdisciplinary care teams allow for improved communication among health care professionals. This study examines the patient- and family-centered use of structured interdisciplinary bedside rounds (SIBR on an acute care for the elderly (ACE unit in a 555-bed metropolitan community hospital. This mixed methods study surveyed 24 nurses, therapists, patient care assistants, and social workers to measure perceptions of teamwork, communication, understanding of the plan for the day, safety, efficiency, and job satisfaction. A similar survey was administered to a control group of 38 of the same staff categories on different units in the same hospital. The control group units utilized traditional physician-centric rounding. Significant differences were found in each category between the SIBR staff on the ACE unit and the control staff. Nurse job satisfaction is an important marker of retention and recruitment, and improved communication may be an important aspect of increasing this satisfaction. Furthermore, improved communication is key to maintaining a safe hospital environment with quality patient care. Interdisciplinary team rounds that take place at the bedside improve both nursing satisfaction and related communication markers of quality and safety, and may help to achieve higher nurse retention and safer

  18. [Does the nutritional care plan and report upon discharge under the health care system substitute the nutrition support team summary at patient discharge?].

    Science.gov (United States)

    Hidaka, Kumi; Matsuoka, Mio; Kajiwara, Kanako; Hinokiyama, Hiromi; Mito, Saori; Doi, Seiko; Konishi, Eriko; Ibata, Takeshi; Komuro, Ryutaro; lijima, Shohei

    2013-12-01

    Our nutrition support team (NST) designed the NST summary for cooperation among personnel providing medical care for nutritional management of high-need patients in our area. After the introduction of the NST fee under the health care system, the number of summary publications decreased. The requested NST fee is necessary for publication of a nutritional care plan and report upon patient discharge. We hypothesized that the nutritional care plan and discharge report were being substituted for the NST summary at the time of patient discharge. We retrospectively investigated 192 cases with NST fee. There were only 13 cases of overlapping publication, and the NST summary was necessary for 107 of 179 cases in which no NST summary had been prepared. Since the space on the report form is limited, it can provide only limited information. However, the NST summary can convey detailed supplementary information. Therefore, there is a high need for the NST summary, and publication of NST summaries for the appropriate cases must continue.

  19. Team Action Imagery and Team Cognition: Imagery of Game Situations and Required Team Actions Promotes a Functional Structure in Players' Representations of Team-Level Tactics.

    Science.gov (United States)

    Frank, Cornelia; Linstromberg, Gian-Luca; Hennig, Linda; Heinen, Thomas; Schack, Thomas

    2018-02-01

    A team's cognitions of interpersonally coordinated actions are a crucial component for successful team performance. Here, we present an approach to practice team action by way of imagery and examine its impact on team cognitions in long-term memory. We investigated the impact of a 4-week team action imagery intervention on futsal players' mental representations of team-level tactics. Skilled futsal players were assigned to either an imagery training group or a no imagery training control group. Participants in the imagery training group practiced four team-level tactics by imagining team actions in specific game situations for three times a week. Results revealed that the imagery training group's representations were more similar to that of an expert representation after the intervention compared with the control group. This study indicates that team action imagery training can have a significant impact on players' tactical skill representations and thus order formation in long-term memory.

  20. Lessons Learned from a Decade of Serving Data to Students and the Public

    Science.gov (United States)

    Chambers, L. H.; Martin, A. M.; Riebeek, H.; Jackson, R.

    2015-12-01

    NASA holds petabytes of Earth science data from a fleet of satellites going back decades. While these data can be invaluable for use in STEM education and communication (E/C), the simple fact that the archive is public is not enough. The key to successful use is to provide technological tools in strategic combination with best practices to meet the needs of various audiences. Students and teachers need access points that are specifically tailored to meet the technology resources in the classroom; citizen scientists need to feel a connection to NASA, easy-to-use technological interfaces, and are motivated by contributing to real research activities; the general public needs short, focused, easily digested tidbits. NASA's Earth science E/C teams have developed strategies combining audience knowledge with new technical capabilities through programs like MY NASA DATA, S'COOL, Earth Observatory, Giovanni, climate.gov, etc. The capability to offer a range of resources targeted to specific audience needs has advanced along several fronts over the last decade through use of the following key strategies: Regularly publishing articles, fact sheets and image captions written with greater detail than media releases to connect basic science concepts with current NASA research. Providing for differing levels of engagement, with basic, intermediate and advanced data access tools as well as lesson plans for grades K-2 through high school. Facilitating the important scientific process of asking questions once students are actively engaged though exploration and manipulation of current Earth data delivered through desktop and mobile apps.. Providing curated data sets that students can more easily interpret. Assessing users' needs through ongoing formative evaluation. Using Analytics to make data-driven decisions about technologies and approaches. We will survey the range of approaches to enabling data use for STEM E/C and will share some of the key lessons learned.

  1. DIFFERENT DIMENSIONS OF TEAMS

    OpenAIRE

    Goparaju Purna SUDHAKAR

    2013-01-01

    Popularity of teams is growing in 21st Century. Organizations are getting their work done through different types of teams. Teams have proved that the collective performance is more than the sum of the individual performances. Thus, the teams have got different dimensions such as quantitative dimensions and qualitative dimensions. The Quantitative dimensions of teams such as team performance, team productivity, team innovation, team effectiveness, team efficiency, team decision making and tea...

  2. Beautiful Teams Inspiring and Cautionary Tales from Veteran Team Leaders

    CERN Document Server

    Stellman, Andrew

    2009-01-01

    What's it like to work on a great software development team facing an impossible problem? How do you build an effective team? Beautiful Teams takes you behind the scenes with some of the most interesting teams in software engineering history. You'll learn from veteran team leaders' successes and failures, told through a series of engaging personal stories -- and interviews -- by leading programmers, architects, project managers, and thought leaders.

  3. Team Building e a enfermagem Team Building e enfermería Team Building and nursing

    Directory of Open Access Journals (Sweden)

    Filipa Homem

    2012-07-01

    Full Text Available Num ambiente de insatisfação crescente e de imprevisibilidade como é o da enfermagem, cada vez mais é fundamental motivar as equipas, conferindo-lhes competências pessoais, relacionais, comunicacionais e, acima de tudo, fomentar o trabalho em equipa e consequentemente a produtividade. O Team Building, surge assim como uma estratégia eficaz para obter resultados positivos. Por ser uma estratégia ainda pouco utilizada em Portugal, decidimos realizar este artigo teórico sobre o assunto e refletir sobre a sua pertinência e potencialidades nas equipas de enfermagem, tendo definido como objetivos: aprofundar conhecimentos sobre Team Building, contextualizar o Team Building no âmbito das teorias organizacionais, descrever diferentes modelos de Team Building e refletir sobre a utilidade do Team Building na qualidade da prestação de cuidados de enfermagem. Deste modo, foram pesquisados artigos na plataforma eletrónica de bases de dados EBSCO, assim como consultada literatura relacionada com a psicologia organizacional. Com a presente pesquisa conclui-se que esta estratégia de dinamização de equipas é útil no âmbito da enfermagem, podendo melhorar a comunicação e relações interpessoais, identificar pontos fortes e fracos das equipas, proporcionar maior satisfação no trabalho e, deste modo, aumentar a qualidade dos cuidados de saúde prestados.En un ambiente de creciente descontento y de imprevisibilidad como el de la enfermería, es cada vez más primordial motivar a los equipos, dándoles competencias personales, relacionales, y, sobre todo, fomentar el trabajo en equipo y consecuentemente la productividad. El Team Building surge así como una estrategia eficaz para lograr resultados positivos. Al ser una estrategia aún poco utilizada en Portugal, se decidió realizar este artículo teórico sobre el asunto y reflexionar sobre la pertinencia y el potencial de los equipos de enfermería, para lo que se definieron los objetivos

  4. The Relationship Between Team Psychological Safety and Team Effectiveness in Management Teams: The Mediating Effect of Dialogue.

    OpenAIRE

    Bilstad, Julie Brat

    2016-01-01

    This study is a response to the research and request presented by Bang and Midelfart (2010), to further investigate the effect dialogue can have on management team s effectiveness. The purpose of the study was to investigate and explain the effect of team psychological safety on task performance and team member satisfaction, with dialogue as a mediator in this relationship. 215 Norwegian and Danish management teams in the private and public sector were studied. As expected, team psychological...

  5. The conversion of spatial planning in Denmark

    DEFF Research Database (Denmark)

    Galland, Daniel

    2014-01-01

    Danish spatial planning has been increasingly subjected to significant structural, functional and conceptual reorientations over the past two decades. The comprehensive hierarchical framework wherein planning policies and practices used to operate became considerably modified after the implementa......Danish spatial planning has been increasingly subjected to significant structural, functional and conceptual reorientations over the past two decades. The comprehensive hierarchical framework wherein planning policies and practices used to operate became considerably modified after...... the implementation of a local government reform back in 2007. The reform abolished the county level, which implied the re-scaling of planning policies, functions and responsibilities to municipal and national levels. This situation brought about radical shifts concerning the implementation of land-use tasks...

  6. Culture and teams.

    Science.gov (United States)

    Kirkman, Bradley L; Shapiro, Debra L; Lu, Shuye; McGurrin, Daniel P

    2016-04-01

    We first review research on culture effects in teams, illustrating that mean levels of team cultural values have main (i.e. direct) effects, indirect effects (i.e. mediated by intervening variables), and moderating influences on team processes and outcomes. Variance in team cultural values or on country of origin (i.e. nationality diversity) also has main effects on team functioning, and we highlight contextual variables that strengthen or weaken these main effects. We next review research examining the effect of variance in team cultural values on global virtual teams, specifically. Finally, we review research on how cultural values shape employees' receptivity to empowering leadership behavior in teams. We conclude by discussing critical areas for future research. Published by Elsevier Ltd.

  7. Profile of medical and injury consultations of Team South Africa ...

    African Journals Online (AJOL)

    Objective. This descriptive study was undertaken to document the nature of medical and injury consultations of the athletes and officials of the South African Team at the 2004 Olympic Games, and to provide data for planning future events. Setting. South African medical facility, 2004 Olympic Games, Athens, Greece.

  8. The innovative rehabilitation team: an experiment in team building.

    Science.gov (United States)

    Halstead, L S; Rintala, D H; Kanellos, M; Griffin, B; Higgins, L; Rheinecker, S; Whiteside, W; Healy, J E

    1986-06-01

    This article describes an effort by one rehabilitation team to create innovative approaches to team care in a medical rehabilitation hospital. The major arena for implementing change was the weekly patient rounds. We worked to increase patient involvement, developed a rounds coordinator role, used a structured format, and tried to integrate research findings into team decision making. Other innovations included use of a preadmission questionnaire, a discharge check list, and a rounds evaluation questionnaire. The impact of these changes was evaluated using the Group Environment Scale and by analyzing participation in rounds based on verbatim transcripts obtained prior to and 20 months after formation of the Innovative Rehabilitation Team (IRT). The results showed decreased participation by medical personnel during rounds, and increased participation by patients. The rounds coordinator role increased participation rates of staff from all disciplines and the group environment improved within the IRT. These data are compared with similar evaluations made of two other groups, which served as control teams. The problems inherent in making effective, lasting changes in interdisciplinary rehabilitation teams are reviewed, and a plea is made for other teams to explore additional ways to use the collective creativity and resources latent in the team membership.

  9. Harnessing members' positive mood for team-directed learning behaviour and team innovation : The moderating role of perceived team feedback

    NARCIS (Netherlands)

    Walter, Frank; van der Vegt, Gerben S.

    2013-01-01

    This study examines the role of individual team members' positive mood and perceived team feedback for their team-directed learning behaviour. Results obtained in a sample of 186 members from 27 work teams showed that positive mood was positively associated with team-directed learning behaviour if

  10. ATLAS upgrades for the next decades

    CERN Document Server

    Hopkins, Walter; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred \\ifb\\ expected for LHC running to 3000 fb$^{-1}$ by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for...

  11. The Influence of Team Functioning and Workload on Sustainability of Trauma-Focused Evidence-Based Psychotherapies.

    Science.gov (United States)

    Mohr, David C; Rosen, Craig S; Schnurr, Paula P; Orazem, Robert J; Noorbaloochi, Siamak; Clothier, Barbara A; Eftekhari, Afsoon; Bernardy, Nancy C; Chard, Kathleen M; Crowley, Jill J; Cook, Joan M; Kehle-Forbes, Shannon M; Ruzek, Josef I; Sayer, Nina A

    2018-05-25

    It has been over a decade since the U.S. Department of Veterans Affairs (VA) began formal dissemination and implementation of two trauma-focused evidence-based psychotherapies (TF-EBPs). The objective of this study was to examine the sustainability of the TF-EBPs and determine whether team functioning and workload were associated with TF-EBP sustainability. This observational study used VA administrative data for 6,251 patients with posttraumatic stress disorder (PTSD) and surveys from 78 providers from 10 purposefully selected PTSD clinical teams located in nine VA medical centers. The outcome was sustainability of TF-EBPs, which was based on British National Health System Sustainability Index scores (possible scores range from 0 to 100.90). Primary predictors included team functioning, workload, and TB-EBP reach to patients with PTSD. Multiple linear regression models were used to examine the influence of team functioning and workload on TF-EBP sustainability after adjustment for covariates that were significantly associated with sustainability. Sustainability Index scores ranged from 53.15 to 100.90 across the 10 teams. Regression models showed that after adjustment for patient and facility characteristics, team functioning was positively associated (B=9.16, psustainability. There was considerable variation across teams in TF-EBP sustainability. The contribution of team functioning and workload to the sustainability of evidence-based mental health care warrants further study.

  12. FMEA team performance in health care: A qualitative analysis of team member perceptions.

    Science.gov (United States)

    Wetterneck, Tosha B; Hundt, Ann Schoofs; Carayon, Pascale

    2009-06-01

    : Failure mode and effects analysis (FMEA) is a commonly used prospective risk assessment approach in health care. Failure mode and effects analyses are time consuming and resource intensive, and team performance is crucial for FMEA success. We evaluate FMEA team members' perceptions of FMEA team performance to provide recommendations to improve the FMEA process in health care organizations. : Structured interviews and survey questionnaires were administered to team members of 2 FMEA teams at a Midwest Hospital to evaluate team member perceptions of FMEA team performance and factors influencing team performance. Interview transcripts underwent content analysis, and descriptive statistics were performed on questionnaire results to identify and quantify FMEA team performance. Theme-based nodes were categorized using the input-process-outcome model for team performance. : Twenty-eight interviews and questionnaires were completed by 24 team members. Four persons participated on both teams. There were significant differences between the 2 teams regarding perceptions of team functioning and overall team effectiveness that are explained by difference in team inputs and process (e.g., leadership/facilitation, team objectives, attendance of process owners). : Evaluation of team members' perceptions of team functioning produced useful insights that can be used to model future team functioning. Guidelines for FMEA team success are provided.

  13. Team Leadership: Leadership Role Achievement in Supervision Teams in Turkey

    OpenAIRE

    Ali Sabanci; Izzet Ozdemir

    2015-01-01

    The purpose of this paper is to explore the views of team leaders and team members of supervision teams about the extent that team leaders achieve their team leadership roles in Turkey. This research was conducted as a survey. The population of the study consisted of approximately 2650 supervisors (inspectors) working in 81 provinces distributed to seven geographical regions in Turkey. The sample consisted of 563 supervisors which were selected out by random sampling. The data were gathered b...

  14. Leader-team complementarity: Exploring the interactive effects of leader personality traits and team power distance values on team processes and performance.

    Science.gov (United States)

    Hu, Jia; Judge, Timothy A

    2017-06-01

    Integrating the leader trait perspective with dominance complementarity theory, we propose team power distance as an important boundary condition for the indirect impact of leader extraversion, agreeableness, and conscientiousness on team performance through a team's potency beliefs and through relational identification with the leader. Using time-lagged, 3-source data from 71 teams, we found that leader extraversion had a positive indirect impact on team in-role and extrarole performance through relational identification, but only for high power distance teams; leader conscientiousness had a positive influence on team in-role performance through team potency, but only for high power distance teams; and leader agreeableness had a positive effect on team in-role and extrarole performance via relational identification and on team in-role performance via team potency, but only for low power distance teams. The findings address prior inconsistencies regarding the relationships between leader traits and team effectiveness, identify an important boundary condition and key team processes that bridge the links, and provide a deeper understanding of the role of leader traits in teams. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  15. The relationship between servant leadership, affective team commitment and team effectiveness

    Directory of Open Access Journals (Sweden)

    Bright Mahembe

    2013-04-01

    Full Text Available Orientation: Value-based leadership practices play a critical role in teamwork in high-performance organisations.Research purpose: The aim of the study was to empirically validate a theoretical model explicating the structural relationships between servant leadership, affective team commitment and team effectiveness.Motivation for the study: The increased eliance on teams for production calls for an analysis of the role of follower-focused leadership practices in enhancing eam effectiveness.Research design, approach and method: A non-probabilityand multicultural sample consisting of 202 primary and secondary school teachers was drawn from 32 chools in the Western Cape Province of South Africa.Main findings: High levels of reliability were found and uni-dimensionality of the subscales was demonstrated through exploratory factor analyses. Good fit with the data was found for the measurement models through confirmatory factor analyses. Structural equation modelling showed a reasonable fit for the structural model. Positive relationships were found amongst servant leadership, team effectiveness and affective team commitment. Standard multiple regression analysis showed that affective team commitment moderated the relationship between servant leadership and team effectiveness.Practical/managerial implications: The findings emphasise the central role played by servant leadership and affective team commitment in team performance. Servant leadership fosters team effectiveness if employees feel committed to their work team.Contribution/value-add: The servant leadership style alone may not be a sufficient condition for team effectiveness; other variables, such as affective team commitment, also play a role. The study suggested specific variables that may also combine with leadership to positively influence team effectiveness.

  16. The team halo effect: why teams are not blamed for their failures.

    Science.gov (United States)

    Naquin, Charles E; Tynan, Renee O

    2003-04-01

    In this study, the existence of the team halo effect, the phenomenon that teams tend not to be blamed for their failures, is documented. With 2 studies using both real teams and controlled scenarios, the authors found evidence that the nature of the causal attribution processes used to diagnose failure scenarios leads to individuals being more likely to be identified as the cause of team failure than the team as a collective. Team schema development, as indexed by team experience, influences this effect, with individuals who have more team experience being less likely to show the team halo effect

  17. The 90s - The decade of the environment meeting the training challenge

    International Nuclear Information System (INIS)

    Worley, T.

    1991-01-01

    The decade of the 90s is the Decade of the Environment--you see it on TV, in papers, magazines... everywhere. Protection of the environment and compliance with new and ever-changing regulations are a must for companies to be successful. Like all other industries, utilities must meet this challenge head on. The nuclear industry has always been aware of the need for training on nuclear issues such as handling nuclear materials and wastes and responding to nuclear emergencies; but to meet the challenges of tomorrow, we must now provide quality training on environmental regulations. This paper outlines the process Duke Power is using to meet the challenge of providing consistent, accurate, relevant training on EPA, OSHA, and DOT regulations. Training programs discussed in this paper include: general employee environmental overview training; RCRA specific training topics; OSHA emergency response team training; and department of transportation training

  18. Transforming Virtual Teams

    DEFF Research Database (Denmark)

    Bjørn, Pernille

    2005-01-01

    Investigating virtual team collaboration in industry using grounded theory this paper presents the in-dept analysis of empirical work conducted in a global organization of 100.000 employees where a global virtual team with participants from Sweden, United Kingdom, Canada, and North America were...... studied. The research question investigated is how collaboration is negotiated within virtual teams? This paper presents findings concerning how collaboration is negotiated within a virtual team and elaborate the difficulties due to invisible articulation work and managing multiple communities...... in transforming the virtual team into a community. It is argued that translucence in communication structures within the virtual team and between team and management is essential for engaging in a positive transformation process of trustworthiness supporting the team becoming a community, managing the immanent...

  19. Team Orientations, Interpersonal Relations, and Team Success

    Science.gov (United States)

    Nixon, Howard L.

    1976-01-01

    Contradictions in post research on the concepts of "cohesiveness" and team success seem to arise from the ways in which cohesiveness is measured and the nature of the teams investigated in each study. (MB)

  20. On-call emergency workload of a general surgical team

    Directory of Open Access Journals (Sweden)

    Jawaid Masood

    2009-01-01

    Full Text Available Background: To examine the on-call emergency workload of a general surgical team at a tertiary care teaching hospital to guide planning and provision of better surgical services. Patients and Methods: During six months period from August to January 2007; all emergency calls attended by general surgical team of Surgical Unit II in Accident and Emergency department (A and E and in other units of Civil, Hospital Karachi, Pakistan were prospectively recorded. Data recorded includes timing of call, diagnosis, operation performed and outcome apart from demography. Results: Total 456 patients (326 males and 130 females were attended by on-call general surgery team during 30 emergency days. Most of the calls, 191 (41.9% were received from 8 am to 5 pm. 224 (49.1% calls were of abdominal pain, with acute appendicitis being the most common specific pathology in 41 (9.0% patients. Total 73 (16.0% calls were received for trauma. Total 131 (28.7% patients were admitted in the surgical unit for urgent operation or observation while 212 (46.5% patients were discharged from A and E. 92 (20.1% patients were referred to other units with medical referral accounts for 45 (9.8% patients. Total 104 (22.8% emergency surgeries were done and the most common procedure performed was appendicectomy in 34 (32.7% patients. Conclusion: Major workload of on-call surgical emergency team is dealing with the acute conditions of abdomen. However, significant proportion of patients are suffering from other conditions including trauma that require a holistic approach to care and a wide range of skills and experience. These results have important implications in future healthcare planning and for the better training of general surgical residents.

  1. Collaborative and Competitive Strategies in Virtual Teams of e-Entrepreneurs: A pan-European Perspective

    Directory of Open Access Journals (Sweden)

    Harry Matlay

    2009-08-01

    Full Text Available Recent advances in Information and Communication Technologies (ICTs and the advent of the Internet have facilitated the emergence and growth of collaborative strategies amongst small e-Businesses (Matlay & Westhead, 2005. In addition, during the last decade or so, team-led entrepreneurship has been identified as a highly profitable alternative to single founder entrepreneurship. Recent research suggests that growth oriented, small e-Businesses operating in international e-Markets are more likely to be founded and managed by teams of e-Entrepreneurs (Matlay & Westhead, 2007. In increasingly globalised and hyper-competitive markets, "virtual teams" of e-Entrepreneurs search, discover and exploit new entrepreneurial opportunities. This type of entrepreneurial team consists of geographically dispersed entrepreneurs who are led by common entrepreneurial interests and interact electronically in order to promote interdependent strategies and fulfil entrepreneurial goals. In this article, an illustrative longitudinal case study of a pan-European virtual team of 24 e-Entrepreneur members is used to evaluate emergent collaborative and competitive strategies in small e-Businesses that are lead and managed by members. Collaborative and competitive strategies of e-Businesses are identified and related outcomes are analysed. Future research opportunities are suggested and pertinent policy recommendations are offered.

  2. Cooperative Robot Teams Applied to the Site Preparation Task

    International Nuclear Information System (INIS)

    Parker, LE

    2001-01-01

    Prior to human missions to Mars, infrastructures on Mars that support human survival must be prepared. robotic teams can assist in these advance preparations in a number of ways. This paper addresses one of these advance robotic team tasks--the site preparation task--by proposing a control structure that allows robot teams to cooperatively solve this aspect of infrastructure preparation. A key question in this context is determining how robots should make decisions on which aspect of the site preparation t6ask to address throughout the mission, especially while operating in rough terrains. This paper describes a control approach to solving this problem that is based upon the ALLIANCE architecture, combined with performance-based rough terrain navigation that addresses path planning and control of mobile robots in rough terrain environments. They present the site preparation task and the proposed cooperative control approach, followed by some of the results of the initial testing of various aspects of the system

  3. Bringing the Science of Team Training to School-Based Teams

    Science.gov (United States)

    Benishek, Lauren E.; Gregory, Megan E.; Hodges, Karin; Newell, Markeda; Hughes, Ashley M.; Marlow, Shannon; Lacerenza, Christina; Rosenfield, Sylvia; Salas, Eduardo

    2016-01-01

    Teams are ubiquitous in schools in the 21st Century; yet training for effective teaming within these settings has lagged behind. The authors of this article developed 5 modules, grounded in the science of team training and adapted from an evidence-based curriculum used in medical settings called TeamSTEPPS®, to prepare instructional and…

  4. Team-Based Models for End-of-Life Care: An Evidence-Based Analysis

    Science.gov (United States)

    2014-01-01

    the patient. A “comprehensive” model is one that provides continuity of service across inpatient and outpatient settings, e.g., in hospital and then at home. All teams consisted of a nurse and physician at minimum, at least one of whom had a specialty in end-of-life health care. More than 50% of the teams offered services that included symptom management, psychosocial care, development of patient care plans, end-of-life care planning, and coordination of care. We found moderate-quality evidence that the use of a comprehensive direct contact model initiated up to 9 months before death improved informal caregiver satisfaction and the odds of having a home death, and decreased the odds of dying in a nursing home. We found moderate-quality evidence that the use of a comprehensive, direct, and early (up to 24 months before death) contact model improved patient quality of life, symptom management, and patient satisfaction. We did not find that using a comprehensive team-based model had an impact on hospital admissions or length of stay. We found low-quality evidence that the use of a home team-based model increased the odds of having a home death. Limitations Heterogeneity in data reporting across studies limited the ability to complete a meta-analysis on many of the outcome measures. Missing data was not managed well within the studies. Conclusions Moderate-quality evidence shows that a comprehensive, direct-contact, team-based model of care provides the following benefits for end-of-life patients with an estimated survival of up to 9 months: it improves caregiver satisfaction and increases the odds of dying at home while decreasing the odds of dying in a nursing home. Moderate-quality evidence also shows that improvement in patient quality of life, symptom management, and patient satisfaction occur when end-of-life care via this model is provided early (up to 24 months before death). However, using this model to deliver end-of-life care does not impact hospital

  5. Technique adaptation, strategic replanning, and team learning during implementation of MR-guided brachytherapy for cervical cancer.

    Science.gov (United States)

    Skliarenko, Julia; Carlone, Marco; Tanderup, Kari; Han, Kathy; Beiki-Ardakani, Akbar; Borg, Jette; Chan, Kitty; Croke, Jennifer; Rink, Alexandra; Simeonov, Anna; Ujaimi, Reem; Xie, Jason; Fyles, Anthony; Milosevic, Michael

    MR-guided brachytherapy (MRgBT) with interstitial needles is associated with improved outcomes in cervical cancer patients. However, there are implementation barriers, including magnetic resonance (MR) access, practitioner familiarity/comfort, and efficiency. This study explores a graded MRgBT implementation strategy that included the adaptive use of needles, strategic use of MR imaging/planning, and team learning. Twenty patients with cervical cancer were treated with high-dose-rate MRgBT (28 Gy in four fractions, two insertions, daily MR imaging/planning). A tandem/ring applicator alone was used for the first insertion in most patients. Needles were added for the second insertion based on evaluation of the initial dosimetry. An interdisciplinary expert team reviewed and discussed the MR images and treatment plans. Dosimetry-trigger technique adaptation with the addition of needles for the second insertion improved target coverage in all patients with suboptimal dosimetry initially without compromising organ-at-risk (OAR) sparing. Target and OAR planning objectives were achieved in most patients. There were small or no systematic differences in tumor or OAR dosimetry between imaging/planning once per insertion vs. daily and only small random variations. Peer review and discussion of images, contours, and plans promoted learning and process development. Technique adaptation based on the initial dosimetry is an efficient approach to implementing MRgBT while gaining comfort with the use of needles. MR imaging and planning once per insertion is safe in most patients as long as applicator shifts, and large anatomical changes are excluded. Team learning is essential to building individual and programmatic competencies. Copyright © 2017 American Brachytherapy Society. Published by Elsevier Inc. All rights reserved.

  6. The relationship between servant leadership, affective team commitment and team effectiveness

    Directory of Open Access Journals (Sweden)

    Bright Mahembe

    2013-04-01

    Full Text Available Orientation: Value-based leadership practices play a critical role in teamwork in high-performance organisations. Research purpose: The aim of the study was to empirically validate a theoretical model explicating the structural relationships between servant leadership, affective team commitment and team effectiveness. Motivation for the study: The increased eliance on teams for production calls for an analysis of the role of follower-focused leadership practices in enhancing eam effectiveness. Research design, approach and method: A non-probabilityand multicultural sample consisting of 202 primary and secondary school teachers was drawn from 32 chools in the Western Cape Province of South Africa. Main findings: High levels of reliability were found and uni-dimensionality of the subscales was demonstrated through exploratory factor analyses. Good fit with the data was found for the measurement models through confirmatory factor analyses. Structural equation modelling showed a reasonable fit for the structural model. Positive relationships were found amongst servant leadership, team effectiveness and affective team commitment. Standard multiple regression analysis showed that affective team commitment moderated the relationship between servant leadership and team effectiveness. Practical/managerial implications: The findings emphasise the central role played by servant leadership and affective team commitment in team performance. Servant leadership fosters team effectiveness if employees feel committed to their work team. Contribution/value-add: The servant leadership style alone may not be a sufficient condition for team effectiveness; other variables, such as affective team commitment, also play a role. The study suggested specific variables that may also combine with leadership to positively influence team effectiveness.

  7. Practice effects on intra-team synergies in football teams.

    Science.gov (United States)

    Silva, Pedro; Chung, Dante; Carvalho, Thiago; Cardoso, Tiago; Davids, Keith; Araújo, Duarte; Garganta, Júlio

    2016-04-01

    Developing synchronised player movements for fluent competitive match play is a common goal for coaches of team games. An ecological dynamics approach advocates that intra-team synchronization is governed by locally created information, which specifies shared affordances responsible for synergy formation. To verify this claim we evaluated coordination tendencies in two newly-formed teams of recreational players during association football practice games, weekly, for fifteen weeks (thirteen matches). We investigated practice effects on two central features of synergies in sports teams - dimensional compression and reciprocal compensation here captured through near in-phase modes of coordination and time delays between coupled players during forward and backwards movements on field while attacking and defending. Results verified that synergies were formed and dissolved rapidly as a result of the dynamic creation of informational properties, perceived as shared affordances among performers. Practising once a week led to small improvements in the readjustment delays between co-positioning team members, enabling faster regulation of coordinated team actions. Mean values of the number of player and team synergies displayed only limited improvements, possibly due to the timescales of practice. No relationship between improvements in dimensional compression and reciprocal compensation were found for number of shots, amount of ball possession and number of ball recoveries made. Findings open up new perspectives for monitoring team coordination processes in sport. Copyright © 2015 Elsevier B.V. All rights reserved.

  8. Environmental Restoration Program Management Control Plan

    International Nuclear Information System (INIS)

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives

  9. It's a team game: exploring factors that influence team experience

    OpenAIRE

    Martin, Eleanor

    2015-01-01

    Many multiplayer games feature teams, and whether they are pitted against each other or against the game itself it seems likely that the way these teams bond will affect the players' experience. What are the factors that influence the experience of being a team member in a game? To what extent can the game designer manipulate the cohesion of the teams by changing the game design? How does the satisfaction of the player with their team relate to their feeling of cohesion? How does cohesion dif...

  10. Collective autonomy and absenteeism within work teams: a team motivation approach.

    Science.gov (United States)

    Rousseau, Vincent; Aubé, Caroline

    2013-01-01

    This study investigates the role of collective autonomy in regard to team absenteeism by considering team potency as a motivational mediator and task routineness as a moderator. The sample consists of 90 work teams (327 members and 90 immediate superiors) drawn from a public safety organization. Results of structural equation modeling indicate that the relationships between collective autonomy and two indicators of team absenteeism (i.e., absence frequency and time lost) are mediated by team potency. Specifically, collective autonomy is positively related to team potency which in turn is negatively related to team absenteeism. Furthermore, results of hierarchical regression analyses show that task routineness moderates the relationships between collective autonomy and the two indicators of team absenteeism such that these relationships are stronger when the level of task routineness is low. On the whole, this study points out that collective autonomy may exercise a motivational effect on attendance at work within teams, but this effect is contingent on task routineness.

  11. Two Decades of Employee-Benefit Plans, 1950-1970: A Review.

    Science.gov (United States)

    Kolodrubetz, Walter W.

    This article discusses the long-term growth of employee-benefit plans (which have grown tremendously since 1950) and assesses this trend in terms of real gains. The article states that contributions, by 1970, were nine times greater and benefit outlays 14 times greater than in 1950, and the number of persons covered by most types of benefits grew…

  12. OntoEmergePlan: variability of emergency plans supported by a domain ontology

    NARCIS (Netherlands)

    Ferreira, Maria I.G.B; Moreira, João; Campos, Maria Luiza M.; Braga, Bernardo F.B; Sales, Tiago P.; de Cordeiro, Kelli F.; Borges, Marcos R.S.

    2015-01-01

    The preparation of high quality emergency plans to guide operational decisions is an approach to mitigate the emergency management complexity. In such multidisciplinary scenario, teams with different perspectives need to collaborate towards a common goal and interact within a common understanding.

  13. 76 FR 46317 - Nantucket National Wildlife Refuge, Nantucket, MA; Draft Comprehensive Conservation Plan, Land...

    Science.gov (United States)

    2011-08-02

    ... INFORMATION CONTACT: Carl Melberg, Planning Team Leader, 978-443-4661, extension 32 (phone); northeastplanning... comments and considered and incorporated them in numerous ways. The CCP planning team consisted of Service... continue its passive management role and minimal presence on the refuge. The remote location of the refuge...

  14. Initiating and utilizing shared leadership in teams: The role of leader humility, team proactive personality, and team performance capability.

    Science.gov (United States)

    Chiu, Chia-Yen Chad; Owens, Bradley P; Tesluk, Paul E

    2016-12-01

    The present study was designed to produce novel theoretical insight regarding how leader humility and team member characteristics foster the conditions that promote shared leadership and when shared leadership relates to team effectiveness. Drawing on social information processing theory and adaptive leadership theory, we propose that leader humility facilitates shared leadership by promoting leadership-claiming and leadership-granting interactions among team members. We also apply dominance complementary theory to propose that team proactive personality strengthens the impact of leader humility on shared leadership. Finally, we predict that shared leadership will be most strongly related to team performance when team members have high levels of task-related competence. Using a sample composed of 62 Taiwanese professional work teams, we find support for our proposed hypothesized model. The theoretical and practical implications of these results for team leadership, humility, team composition, and shared leadership are discussed. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  15. Mr. Traore introduces team supervision. Case scenarios for training and group discussion.

    Science.gov (United States)

    1993-01-01

    This supplement to "The Family Planning Manager" presents a case example and five case discussion questions to illustrate the concept of team supervision. In contrast to traditional supervision, where an emphasis is placed on inspection and the uncovering of deficiencies, team supervision uses a facilitative, advocacy-oriented approach. Problem-solving and decision-making responsibilities are assumed by the clinic staff, who identify and analyze problems in group meetings. Thus, the focus shifts from assessing individual performance to evaluating how well they meet clinic objectives as a team. In the team meetings, the visiting supervisor asks the team as a whole to analyze clinic problems and ensures that all staff members are aware of the significance of their contributions. The supervisor also clarifies the division of labor required for implementing solutions and performance standards. Staff are asked if they have concerns they would like communicated to the next organizational level. The supervisory report of the visit can serve as a guide for implementing the recommendations. This approach may require that supervisors and clinic managers receive training in problem solving, motivating staff, team building, and providing constructive feedback.

  16. A ten-step process to develop case management plans.

    Science.gov (United States)

    Tahan, Hussein A

    2002-01-01

    The use of case management plans has contained cost and improved quality of care successfully. However, the process of developing these plans remains a great challenge for healthcare executives, in this article, the author presents the answer to this challenge by discussing a 10-step formal process that administrators of patient care services and case managers can adapt to their institutions. It also can be used by interdisciplinary team members as a practical guide to develop a specific case management plan. This process is applicable to any care setting (acute, ambulatory, long term, and home care), diagnosis, or procedure. It is particularly important for those organizations that currently do not have a deliberate and systematic process to develop case management plans and are struggling with how to improve the efficiency and productivity of interdisciplinary teams charged with developing case management plans.

  17. Future In-Space Operations (FISO): A Working Group and Community Engagement

    Science.gov (United States)

    Thronson, Harley; Lester, Dan

    2013-01-01

    Long-duration human capabilities beyond low Earth orbit (LEO), either in support of or as an alternative to lunar surface operations, have been assessed at least since the late 1960s. Over the next few months, we will present short histories of concepts for long-duration, free-space human habitation beyond LEO from the end of the Apollo program to the Decadal Planning Team (DPT)/NASA Exploration Team (NExT), which was active in 1999 2000 (see Forging a vision: NASA s Decadal Planning Team and the origins of the Vision for Space Exploration , The Space Review, December 19, 2005). Here we summarize the brief existence of the Future In-Space Operations (FISO) working group in 2005 2006 and its successor, a telecon-based colloquium series, which we co-moderate.

  18. Hoe teams deadlines halen : een aanzet tot team-timemanagement

    NARCIS (Netherlands)

    Gevers, J.M.P.; Rutte, C.G.

    2014-01-01

    Dit artikel geeft een overzicht van de stand van zaken in de wetenschappelijk literatuur ten aanzien van de vraag hoe teams hun deadlines halen. Het beschikbare materiaal wijst erop dat teams beter in staat zijn om deadlines te halen als teamleden, naast een gemeenschappelijke visie op het team en

  19. [Local planning: the speech of basic health care center manager].

    Science.gov (United States)

    Cubas, Márcia Regina

    2005-01-01

    As planning is understood as a management tool, this article offers an argument through the speech framework of Basic Health Care Center Managers in the city of Curitiba-PR, by means of the Collective Subject Speech Methodology on local planning aspects. Its purpose is to bring local managers to a reflection concerning their styles, practices and experiences, as well as to collaborate with central level leading teams towards building their planning processes in an upward, participatory, communicative and strategic way. Considerations of the speeches built from central ideas are presented: planning methodology; inter-sectoriality; territorial basis; team and community participation; training, autonomy and particular profile of local managers; the manager's agenda; and institutional culture.

  20. Teaming up

    DEFF Research Database (Denmark)

    Warhuus, Jan; Günzel-Jensen, Franziska; Robinson, Sarah

    or pre-arranged at random. Therefore we investigate the importance of team formation in the entrepreneurial classroom and ask: (i) What are the underlying factors that influence outcomes of teamwork in student groups? (ii) How does team formation influence student perception of learning?, and (iii) Do...... different team formation strategies produce different teamwork and learning outcomes? Approach: We employed a multiple case study design comprising of 38 student teams to uncover potential links between team formation and student perception of learning. This research draws on data from three different....... A rigorous coding and inductive analysis process was undertaken. Pattern and relationship coding were used to reveal underlying factors, which helped to unveil important similarities and differences between student in different teams’ project progress and perception of learning. Results: When students...

  1. A randomized, controlled clinical trial of a geriatric consultation team. Compliance with recommendations.

    Science.gov (United States)

    Allen, C M; Becker, P M; McVey, L J; Saltz, C; Feussner, J R; Cohen, H J

    1986-05-16

    As part of a prospective, randomized, controlled study of the effectiveness of a geriatric consultation team, we examined compliance by the house staff with recommendations made by the team. Recommendations were formulated for 185 patients, aged 75 years or older, who were randomized into intervention (n = 92) and control (n = 93) groups. In the control group, only 27.1% of the actions that would have been recommended by the team were implemented independently by the house staff. Problems commonly neglected included polypharmacy, sensory impairment, confusion, and depression. In the intervention group, overall compliance was 71.7%. Highest compliance occurred for recommendations addressing instability and falls (95.0%) and discharge planning (94.3%). We conclude that a geriatric consultation team contributes substantial additional input into the care of older patients. Furthermore, relatively high compliance can be achieved with recommendations made by a geriatric consultation team, thereby overcoming the first barrier to the establishment of such a service.

  2. Introduction to Strategic Planning in Student Affairs: A Model for Process and Elements of a Plan

    Science.gov (United States)

    Ellis, Shannon E.

    2010-01-01

    Planning from a strategic perspective has been a mainstay of organizational management for decades. Founded in the private sector, strategic planning is now embraced by the nonprofit world as a catalyst for sound resource allocation, transformative decision making, and motivating staff. Student affairs professionals who think, plan, and act…

  3. The effects of team reflexivity on psychological well-being in manufacturing teams.

    Science.gov (United States)

    Chen, Jingqiu; Bamberger, Peter A; Song, Yifan; Vashdi, Dana R

    2018-04-01

    While the impact of team reflexivity (a.k.a. after-event-reviews, team debriefs) on team performance has been widely examined, we know little about its implications on other team outcomes such as member well-being. Drawing from prior team reflexivity research, we propose that reflexivity-related team processes reduce demands, and enhance control and support. Given the centrality of these factors to work-based strain, we posit that team reflexivity, by affecting these factors, may have beneficial implications on 3 core dimensions of employee burnout, namely exhaustion, cynicism, and inefficacy (reduced personal accomplishment). Using a sample of 469 unskilled manufacturing workers employed in 73 production teams in a Southern Chinese factory, we implemented a time lagged, quasi-field experiment, with half of the teams trained in and executing an end-of-shift team debriefing, and the other half assigned to a control condition and undergoing periodic postshift team-building exercises. Our findings largely supported our hypotheses, demonstrating that relative to team members assigned to the control condition, those assigned to the reflexivity condition experienced a significant improvement in all 3 burnout dimensions over time. These effects were mediated by control and support (but not demands) and amplified as a function of team longevity. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  4. High-school Student Teams in a National NASA Microgravity Science Competition

    Science.gov (United States)

    DeLombard, Richard; Hodanbosi, Carol; Stocker, Dennis

    2003-01-01

    of Illinois, Indiana, Michigan, Minnesota, Ohio, and Wisconsin. The third year for DIME was conducted during the 2002-2003 school year for teams from the fifty United States, the District of Columbia, and Puerto Rico. An annual national DIME program is planned for the foreseeable future. Presented in this paper will be a description of DIME, an overview of the planning and execution of such a program, results from the first three years, and lessons learned from the first national competition.

  5. Leading Teams of Higher Education Administrators: Integrating Goal Setting, Team Role, and Team Life Cycle Theories

    Science.gov (United States)

    Posthuma, Richard; Al-Riyami, Said

    2012-01-01

    Leaders of higher education institutions can create top management teams of academic administrators to guide and improve their organizations. This study illustrates how the leadership of top management teams can be accomplished successfully through a combination of goal setting (Doran, 1981; Locke & Latham, 1990), understanding of team roles…

  6. Medication use by Team South Africa during the XXVIIIth Olympiad ...

    African Journals Online (AJOL)

    Objective. This descriptive study was undertaken to report the medications used by the athletes and officials of Team South Africa at the 2004 Olympic Games and to provide a model for the estimation of quantities to be used for planning support to future events. Setting. South African medical facility, 2004 Olympic Games, ...

  7. Resource assessment/commercialization planning meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-01-24

    The U.S. Department of Energy, Division of Geothermal Energy and Division of Geothermal Resource Management, sponsored a Resource Assessment/Commercialization Planning meeting in Salt Lake City on January 21-24, 1980. The meeting included presentations by state planning and resource teams from all DOE regions. An estimated 130 people representing federal, state and local agencies, industry and private developers attended.

  8. Strategic facility planning improves capital decision making.

    Science.gov (United States)

    Reeve, J R

    2001-03-01

    A large, Midwestern IDS undertook a strategic facility-planning process to evaluate its facility portfolio and determine how best to allocate future investments in facility development. The IDS assembled a facility-planning team, which initiated the planning process with a market analysis to determine future market demands and identify service areas that warranted facility expansion. The team then analyzed each of the IDS's facilities from the perspective of uniform capacity measurements, highest and best use compared with needs, building condition and investment-worthiness, and facility growth and site development opportunities. Based on results of the analysis, the strategy adopted entailed, in part, shifting some space from inpatient care to ambulatory care services and demolishing and replacing the 11 percent of facilities deemed to be in the worst condition.

  9. A THEORETICAL MODEL OF SOCIO-PSYCHOLOGICAL SUPPORT WORK PROCESSES FOR MANAGEMENT OF PRODUCTION TEAM

    Directory of Open Access Journals (Sweden)

    Tatyana Gennadevna Pronyushkina

    2015-10-01

    Full Text Available This article discusses the management of production team, in particular the developed theoretical model of socio-psychological support work processes for management of production team. The author of the research are formulated the purpose and objectives of social-psychological work on management of the production team. Developed in the study a theoretical model aimed at determining the conditions and the identification of features of effective management of the enterprise taking into account the socio-psychological characteristics of its staff. Tasks include: definition of the main characteristics of the production team and their severity, the analysis of these characteristics and identifying opportunities for their transformation, development of recommendations for management of social-psychological work on effects on the characteristics of the collective enterprise.Practical study of the activities of a number of businesses have shown the need to improve socio-psychological support of management processes production team: introducing a social and psychological planning team and develop the practice of sociological research on the state of the team, to ensure the smoothing of relations between workers and management through periodic meetings, creations of conditions for feedback, maintaining healthy competition among team members.

  10. Marketing and Distribution: A Team Plan for In-Service Follow-Up

    Science.gov (United States)

    Mason, Ralph E.

    1976-01-01

    Distributive education (DE) teacher education universities in Indiana completed a consortium testing an exemplary plan to use in followup service activities with first- and second-year distributive education teachers. How the plan was developed and ways in which it was successful are discussed. (HD)

  11. Pacific Northwest National Laboratory’s Climate Resiliency Planning Process and Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    Fowler, Kimberly M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Judd, Kathleen S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Brandenberger, Jill M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-02-22

    In 2015, the Pacific Northwest National Laboratory (PNNL) developed its first Climate Resilience Plan for its Richland Campus. PNNL has performed Climate Resilience Planning for the Department of Defense, Nuclear Regulatory Commission, and Department of Energy (DOE) over the past 5 years. The assessment team included climate scientists, social scientists, engineers, and operations managers. A multi-disciplinary team was needed to understand the potential exposures to future changes at the site, the state of the science on future impacts, and the best process for “mainstreaming” new actions into existing activities. The team uncovered that the site’s greatest vulnerabilities, and therefore priorities for climate resilience planning, are high temperature due to degraded infrastructure, increased wildfire frequency, and intense precipitation impacts on stormwater conveyance systems.

  12. Extra-team connections for knowledge transfer between staff teams

    Science.gov (United States)

    Ramanadhan, Shoba; Wiecha, Jean L.; Emmons, Karen M.; Gortmaker, Steven L.; Viswanath, Kasisomayajula

    2009-01-01

    As organizations implement novel health promotion programs across multiple sites, they face great challenges related to knowledge management. Staff social networks may be a useful medium for transferring program-related knowledge in multi-site implementation efforts. To study this potential, we focused on the role of extra-team connections (ties between staff members based in different site teams) as potential channels for knowledge sharing. Data come from a cross-sectional study of afterschool childcare staff implementing a health promotion program at 20 urban sites of the Young Men's Christian Association of Greater Boston. We conducted a sociometric social network analysis and attempted a census of 91 program staff members. We surveyed 80 individuals, and included 73 coordinators and general staff, who lead and support implementation, respectively, in this study. A multiple linear regression model demonstrated a positive relationship between extra-team connections (β = 3.41, P knowledge transfer. We also found that intra-team connections (within-team ties between staff members) were also positively related to skill receipt. Connections between teams appear to support knowledge transfer in this network, but likely require greater active facilitation, perhaps via organizational changes. Further research on extra-team connections and knowledge transfer in low-resource, high turnover environments is needed. PMID:19528313

  13. Information delivery in team communication of MCR operators for an emergency task

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Kwang Sub; Park, Jin Kyun; Jung, Won Dae

    2005-01-01

    Team performance is a major measure to evaluate the ability of team when a lot of people perform a task of common purpose such as the main control room operators in the nuclear power plant. A team performance is affected the collaboration and communication among operators under dynamic situation as well as by the cognitive process of each team member. Specially, under the emergency situation, more clear and apparent communication in a team is a critical key for the appropriate response to emergency situation. As a general human factor analysis accesses the operator's behavior, it leads to a resulting action of planning, decision, problem-solving. In order to access the internal information and background information of his/her behavior, the verbal protocol analysis is applied. The impact factors on the team performance are derived from the state of the art for team performance, and it is found that the communication is a common key for all impact factors. And, in turn, the impact factors for the communication are accesses and the more detailed analysis is performed. The recorded data for the operator training for emergency situation of nuclear power plant training center are analyzed according to the verbal protocol analysis that are being generally utilized in cognitive psychology, educational psychology, and cognitive science. Two aspects, external (syntax) and internal (symantic) aspects of communication are reviewed. From the syntax analysis, it is found that the task of each step in EOP is separated according to each corresponding operator and the ordinary training is important, and the weak-points for a sentence presentation can be found team-by-team. And, from the symantic analysis for the diagnostic procedure of EOP is performed and the communication errors due to different situation awareness by operators could be found, and it lead to a diagnosis failure. The factors for different symantic cognition for a situation are analyzed and the affecting

  14. Job satisfaction among mental healthcare professionals: The respective contributions of professional characteristics, team attributes, team processes, and team emergent states

    Science.gov (United States)

    Fleury, Marie-Josée; Grenier, Guy; Bamvita, Jean-Marie

    2017-01-01

    Objectives: The aim of this study was to determine the respective contribution of professional characteristics, team attributes, team processes, and team emergent states on the job satisfaction of 315 mental health professionals from Quebec (Canada). Methods: Job satisfaction was measured with the Job Satisfaction Survey. Independent variables were organized into four categories according to a conceptual framework inspired from the Input-Mediator-Outcomes-Input Model. The contribution of each category of variables was assessed using hierarchical regression analysis. Results: Variations in job satisfaction were mostly explained by team processes, with minimal contribution from the other three categories. Among the six variables significantly associated with job satisfaction in the final model, four were team processes: stronger team support, less team conflict, deeper involvement in the decision-making process, and more team collaboration. Job satisfaction was also associated with nursing and, marginally, male gender (professional characteristics) as well as with a stronger affective commitment toward the team (team emergent states). Discussion and Conclusion: Results confirm the importance for health managers of offering adequate support to mental health professionals, and creating an environment favorable to collaboration and decision-sharing, and likely to reduce conflicts between team members. PMID:29276591

  15. Job satisfaction among mental healthcare professionals: The respective contributions of professional characteristics, team attributes, team processes, and team emergent states.

    Science.gov (United States)

    Fleury, Marie-Josée; Grenier, Guy; Bamvita, Jean-Marie

    2017-01-01

    The aim of this study was to determine the respective contribution of professional characteristics, team attributes, team processes, and team emergent states on the job satisfaction of 315 mental health professionals from Quebec (Canada). Job satisfaction was measured with the Job Satisfaction Survey. Independent variables were organized into four categories according to a conceptual framework inspired from the Input-Mediator-Outcomes-Input Model. The contribution of each category of variables was assessed using hierarchical regression analysis. Variations in job satisfaction were mostly explained by team processes, with minimal contribution from the other three categories. Among the six variables significantly associated with job satisfaction in the final model, four were team processes: stronger team support, less team conflict, deeper involvement in the decision-making process, and more team collaboration. Job satisfaction was also associated with nursing and, marginally, male gender (professional characteristics) as well as with a stronger affective commitment toward the team (team emergent states). Results confirm the importance for health managers of offering adequate support to mental health professionals, and creating an environment favorable to collaboration and decision-sharing, and likely to reduce conflicts between team members.

  16. Educational program in crisis management for cardiac surgery teams including high realism simulation.

    Science.gov (United States)

    Stevens, Louis-Mathieu; Cooper, Jeffrey B; Raemer, Daniel B; Schneider, Robert C; Frankel, Allan S; Berry, William R; Agnihotri, Arvind K

    2012-07-01

    Cardiac surgery demands effective teamwork for safe, high-quality care. The objective of this pilot study was to develop a comprehensive program to sharpen performance of experienced cardiac surgical teams in acute crisis management. We developed and implemented an educational program for cardiac surgery based on high realism acute crisis simulation scenarios and interactive whole-unit workshop. The impact of these interventions was assessed with postintervention questionnaires, preintervention and 6-month postintervention surveys, and structured interviews. The realism of the acute crisis simulation scenarios gradually improved; most participants rated both the simulation and whole-unit workshop as very good or excellent. Repeat simulation training was recommended every 6 to 12 months by 82% of the participants. Participants of the interactive workshop identified 2 areas of highest priority: encouraging speaking up about critical information and interprofessional information sharing. They also stressed the importance of briefings, early communication of surgical plan, knowing members of the team, and continued simulation for practice. The pre/post survey response rates were 70% (55/79) and 66% (52/79), respectively. The concept of working as a team improved between surveys (P = .028), with a trend for improvement in gaining common understanding of the plan before a procedure (P = .075) and appropriate resolution of disagreements (P = .092). Interviewees reported that the training had a positive effect on their personal behaviors and patient care, including speaking up more readily and communicating more clearly. Comprehensive team training using simulation and a whole-unit interactive workshop can be successfully deployed for experienced cardiac surgery teams with demonstrable benefits in participant's perception of team performance. Copyright © 2012 The American Association for Thoracic Surgery. Published by Mosby, Inc. All rights reserved.

  17. The Team Climate Inventory: application in hospital teams and methodological considerations.

    NARCIS (Netherlands)

    Ouwens, M.M.T.J.; Hulscher, M.E.J.L.; Akkermans, R.P.; Hermens, R.P.M.G.; Grol, R.P.T.M.; Wollersheim, H.C.H.

    2008-01-01

    OBJECTIVE: To test the validity, reliability and discriminating capacity of an instrument to assess team climate, the Team Climate Inventory (TCI), in a sample of Dutch hospital teams. The TCI is based on a four-factor theory of team climate for innovation. DESIGN: Validation study. SETTING:

  18. Team Scaffolds: How Minimal Team Structures Enable Role-based Coordination

    OpenAIRE

    Valentine, Melissa A

    2013-01-01

    In this dissertation, I integrate research on role-based coordination with concepts adapted from the team effectiveness literature to theorize how minimal team structures support effective coordination when people do not work together regularly. I argue that role-based coordination among relative strangers can be interpersonally challenging and propose that team scaffolds (minimal team structures that bound groups of roles rather than groups of individuals) may provide occupants with a tempor...

  19. Meta-analysis of landscape conservation plan evaluations

    Science.gov (United States)

    Michaela Foster; M. Nils Peterson; Frederick Cubbage; Gerard McMahon

    2016-01-01

    The number of studies evaluating the quality and content of many types of plans have grown in recent decades. Natural resource conservation plans have been included in some of these plan evaluation studies; however, no meta-analysis of natural resource planning literature has been conducted. This focus is needed because natural resource conservation planning differs...

  20. Teams, Team Motivation, and the Theory of the Firm

    DEFF Research Database (Denmark)

    Foss, Nicolai Juul; Lindenberg, Siegwart

    A concern with teams was central to early attempts to grasp the nature of the firm, but fell out of favor in later work. We encourage a return to the emphasis on teams, but argue that the idea of teams as central to the nature of the firm needs to be grounded in an appreciation of the importance...

  1. Onboard Short Term Plan Viewer

    Science.gov (United States)

    Hall, Tim; LeBlanc, Troy; Ulman, Brian; McDonald, Aaron; Gramm, Paul; Chang, Li-Min; Keerthi, Suman; Kivlovitz, Dov; Hadlock, Jason

    2011-01-01

    Onboard Short Term Plan Viewer (OSTPV) is a computer program for electronic display of mission plans and timelines, both aboard the International Space Station (ISS) and in ISS ground control stations located in several countries. OSTPV was specifically designed both (1) for use within the limited ISS computing environment and (2) to be compatible with computers used in ground control stations. OSTPV supplants a prior system in which, aboard the ISS, timelines were printed on paper and incorporated into files that also contained other paper documents. Hence, the introduction of OSTPV has both reduced the consumption of resources and saved time in updating plans and timelines. OSTPV accepts, as input, the mission timeline output of a legacy, print-oriented, UNIX-based program called "Consolidated Planning System" and converts the timeline information for display in an interactive, dynamic, Windows Web-based graphical user interface that is used by both the ISS crew and ground control teams in real time. OSTPV enables the ISS crew to electronically indicate execution of timeline steps, launch electronic procedures, and efficiently report to ground control teams on the statuses of ISS activities, all by use of laptop computers aboard the ISS.

  2. Managing multicultural teams.

    Science.gov (United States)

    Brett, Jeanne; Behfar, Kristin; Kern, Mary C

    2006-11-01

    Multicultural teams offer a number of advantages to international firms, including deep knowledge of different product markets, culturally sensitive customer service, and 24-hour work rotations. But those advantages may be outweighed by problems stemming from cultural differences, which can seriously impair the effectiveness of a team or even bring itto a stalemate. How can managers best cope with culture-based challenges? The authors conducted in-depth interviews with managers and members of multicultural teams from all over the world. Drawing on their extensive research on dispute resolution and teamwork and those interviews, they identify four problem categories that can create barriers to a team's success: direct versus indirect communication, trouble with accents and fluency, differing attitudes toward hierarchy and authority, and conflicting norms for decision making. If a manager--or a team member--can pinpoint the root cause of the problem, he or she is likelier to select an appropriate strategy for solving it. The most successful teams and managers, the authors found, dealt with multicultural challenges in one of four ways: adaptation (acknowledging cultural gaps openly and working around them), structural intervention (changing the shape or makeup of the team), managerial intervention (setting norms early or bringing in a higher-level manager), and exit (removing a team member when other options have failed). Which strategy is best depends on the particular circumstances--and each has potential complications. In general, though, managers who intervene early and set norms; teams and managers who try to engage everyone on the team; and teams that can see challenges as stemming from culture, not personality, succeed in solving culture-based problems with good humor and creativity. They are the likeliest to harvest the benefits inherent in multicultural teams.

  3. Financial Management Competence of Founding Teams and Growth of New Technology-Based Firms

    DEFF Research Database (Denmark)

    Brinckmann, Jan; Gemuenden, Hans Georg; Salomo, Søren

    2009-01-01

    This article draws on the resource-based view to analyze the role founding teams' financial management competencies play for firm growth. Prior research stressed the importance of acquiring external financial resources. In this study, we broaden the understanding of financial management in new......-assessments of their financial management competencies at start-up. We apply the partial least squares approach to determine the effects of the different financial management competencies on firm growth....... firms. We explore the relevance of strategic financial planning competence, external financing competence, competence in financing from cash flow, and controlling competence of entrepreneurial teams for the growth of new technology-based firms. A total of 212 founding teams provided self...

  4. Strategic Planning for Cardiac Services

    National Research Council Canada - National Science Library

    Gauthier, Gail D

    2008-01-01

    .... In August 2007, a Tiger Team formed between members of DDEAMC and the Augusta VAMC to determine causative factors contributing to the results, and to provide an action plan that would satisfy CSCB requirements...

  5. Team Effectiveness and Team Development in CSCL

    Science.gov (United States)

    Fransen, Jos; Weinberger, Armin; Kirschner, Paul A.

    2013-01-01

    There is a wealth of research on computer-supported cooperative work (CSCW) that is neglected in computer-supported collaborative learning (CSCL) research. CSCW research is concerned with contextual factors, however, that may strongly influence collaborative learning processes as well, such as task characteristics, team formation, team members'…

  6. Group, Team, or Something in Between? Conceptualising and Measuring Team Entitativity

    Science.gov (United States)

    Vangrieken, Katrien; Boon, Anne; Dochy, Filip; Kyndt, Eva

    2017-01-01

    The current gap between traditional team research and research focusing on non-strict teams or groups such as teacher teams hampers boundary-crossing investigations of and theorising on teamwork and collaboration. The main aim of this study includes bridging this gap by proposing a continuum-based team concept, describing the distinction between…

  7. Structured nursing communication on interdisciplinary acute care teams improves perceptions of safety, efficiency, understanding of care plan and teamwork as well as job satisfaction.

    Science.gov (United States)

    Gausvik, Christian; Lautar, Ashley; Miller, Lisa; Pallerla, Harini; Schlaudecker, Jeffrey

    2015-01-01

    Efficient, accurate, and timely communication is required for quality health care and is strongly linked to health care staff job satisfaction. Developing ways to improve communication is key to increasing quality of care, and interdisciplinary care teams allow for improved communication among health care professionals. This study examines the patient- and family-centered use of structured interdisciplinary bedside rounds (SIBR) on an acute care for the elderly (ACE) unit in a 555-bed metropolitan community hospital. This mixed methods study surveyed 24 nurses, therapists, patient care assistants, and social workers to measure perceptions of teamwork, communication, understanding of the plan for the day, safety, efficiency, and job satisfaction. A similar survey was administered to a control group of 38 of the same staff categories on different units in the same hospital. The control group units utilized traditional physician-centric rounding. Significant differences were found in each category between the SIBR staff on the ACE unit and the control staff. Nurse job satisfaction is an important marker of retention and recruitment, and improved communication may be an important aspect of increasing this satisfaction. Furthermore, improved communication is key to maintaining a safe hospital environment with quality patient care. Interdisciplinary team rounds that take place at the bedside improve both nursing satisfaction and related communication markers of quality and safety, and may help to achieve higher nurse retention and safer patient care. These results point to the interconnectedness and dual benefit to both job satisfaction and patient quality of care that can come from enhancements to team communication.

  8. Do You Have a Crisis Management Plan?

    Science.gov (United States)

    Pleviak, Walter; Milkevitch, Frank

    2001-01-01

    Although certain crises cannot be prevented, reactions to many can be planned. A crisis-management team should be organized for each building. Critical crisis-plan elements include telephone trees, forms, reference articles, sample letters, and processes for dealing with local media. Spokespersons should have facts straight before speaking. (MLH)

  9. Strategy for the International Lunar Decade

    Science.gov (United States)

    Beldavs, V.; Dunlop, D.; Foing, B.

    2015-10-01

    LD is a global event and process for international collaboration in space initiated by the International Lunar Exploration Working Group (ILEWG), the National Space Society and the National Science Centre FOTONIKA-LV of the University of Latvia. ILD is planned for launch in 2017, the 60th anniversary of the International Geophysical Year that marked the dawn of the space age with the launch of Sputnik. ILD is envisioned as a decade long process of international collaboration with lunar exploration concurrent with development of policies, key enabling technologies and infrastructures on the Moon and in cislunar space leading towards an eventual goal of industrial development of the Moon and economic activity beyond Earth orbit[1]. This second International Lunar Decade will build on the foundations of the ILD first proposed in by the Planetary Society in 2006 at International Conference on Exploration and Utilisation of the Moon (ICEUM), was endorsed by ICEUM participants[3], and then by ILEWG, COSPAR and other organizations. Starting in 2007, the work plan included a series of recommendations for lunar exploration missions coordinated through the ILEWG agencies and COSPAR. Advances in technology such as CubeSats and 3D printing and fundamental changes in mind-set marked by initiatives such as the Google Lunar-X prize and asteroid mining ventures have made industrial development of the Moon a thinkable proposition. The ILD to be launched in 2017 is intended to set the stage for the Moon to become a wealth generating platform for human expansion into the solar system.ILD is being organized to engage existing organizations involved in space collaboration such as COSPAR, COPUOS, ISECG, technical and scientific organizations and others that address space policy, space law, space security, governance and related concerns. Additional organizations will be involved that deal with structures, ecosystems, financing, economic development and health and life support and

  10. "Part of the Team": Mapping the outcomes of training patients for new roles in health research and planning.

    Science.gov (United States)

    Shklarov, Svetlana; Marshall, Deborah A; Wasylak, Tracy; Marlett, Nancy J

    2017-12-01

    A patient research internship (Patient and Community Engagement Research program-PaCER) was created to support a provincial commitment by Alberta Health Services' Strategic Clinical Networks ™ to find new ways to engage patients in a new interdisciplinary organization to support evidence-informed improvements in clinical outcomes across the health system. Implement and test a new research method and training curriculum to build patient capacity for engagement in health through peer-to-peer research. Programme evaluation using Outcome Mapping and the grounded theory method. Twenty-one patients with various chronic conditions completed one year of training in adapted qualitative research methods, including an internship where they designed and conducted five peer-to-peer inquiries into a range of health experiences. Outcomes were continually monitored and evaluated using an Outcome Mapping framework, in combination with grounded theory analysis, based on data from focus groups, observation, documentation review and semi-structured interviews (21 patient researchers, 15 professional collaborators). Key stakeholders indicated the increased capacity of patients to engage in health-care research and planning, and the introduction and acceptance of new, collaborative roles for patients in health research. The uptake of new patient roles in health-care planning began to impact attitudes and practices. Patient researchers become "part of the team" through cultural and relationship changes that occur in two convergent directions: (i) building the capacity of patients to engage confidently in a dialogue with clinicians and decision makers, and (ii) increasing the readiness for patient engagement uptake within targeted organizations. © 2017 The Authors Health Expectations Published by John Wiley & Sons Ltd.

  11. Trust in Diverse Teams

    DEFF Research Database (Denmark)

    Clausen, Lisbeth

    , maintaining team cohesiveness in multicultural teams to collaborate effectively presents a number of challenges. The present study employs the concept of trust to explore influences on team collaboration in high performing teams. The study is based on observation of teams in seven multinational corporations...... and interviews with managers from the US, Europe, China and Japan. The study presents a conceptual framework - a ‘trust buffer’ – which enables analysis and exemplification of the dynamics and challenges of teams as drivers of change. Each team has strategically important tasks, unique capacities and deal...... with change in particular ways: Each team is analyzed in relation to its global (HQ) mandate, local (national) stakeholders and organizational context. It is found that communication energy, resources and team mandate underscore the sense of trust in high performing teams. Diversity is understood...

  12. One Big Happy Family? Unraveling the Relationship between Shared Perceptions of Team Psychological Contracts, Person-Team Fit and Team Performance.

    Science.gov (United States)

    Gibbard, Katherine; Griep, Yannick; De Cooman, Rein; Hoffart, Genevieve; Onen, Denis; Zareipour, Hamidreza

    2017-01-01

    With the knowledge that team work is not always associated with high(er) performance, we draw from the Multi-Level Theory of Psychological Contracts, Person-Environment Fit Theory, and Optimal Distinctiveness Theory to study shared perceptions of psychological contract (PC) breach in relation to shared perceptions of complementary and supplementary fit to explain why some teams perform better than other teams. We collected three repeated survey measures in a sample of 128 respondents across 46 teams. After having made sure that we met all statistical criteria, we aggregated our focal variables to the team-level and analyzed our data by means of a longitudinal three-wave autoregressive moderated-mediation model in which each relationship was one-time lag apart. We found that shared perceptions of PC breach were directly negatively related to team output and negatively related to perceived team member effectiveness through a decrease in shared perceptions of supplementary fit. However, we also demonstrated a beneficial process in that shared perceptions of PC breach were positively related to shared perceptions of complementary fit, which in turn were positively related to team output. Moreover, best team output appeared in teams that could combine high shared perceptions of complementary fit with modest to high shared perceptions of supplementary fit. Overall, our findings seem to indicate that in terms of team output there may be a bright side to perceptions of PC breach and that perceived person-team fit may play an important role in this process.

  13. Two-year outcome of team-based intensive case management for patients with schizophrenia.

    Science.gov (United States)

    Aberg-Wistedt, A; Cressell, T; Lidberg, Y; Liljenberg, B; Osby, U

    1995-12-01

    Two-year outcomes of patients with schizophrenic disorders who were assigned to an intensive, team-based case management program and patients who received standard psychiatric services were assessed. The case management model featured increased staff contact time with patients, rehabilitation plans based on patients' expressed needs, and patients' attendance at team meetings where their rehabilitation plan was discussed. Forty patients were randomly assigned to either the case management group or the control group that received standard services. Patients' use of emergency and inpatient services, their quality of life, the size of their social networks, and their relatives' burden of care were assessed at assignment to the study groups and at two-year follow-up. Patients in the case management group had significantly fewer emergency visits compared with the two years before the study, and their relatives reported significantly reduced burden of care associated with relationships with psychiatric services over the two-year period. The size of patients' social networks increased for the case management group and decreased for the control group. A team-based intensive case management model is an effective intervention in the rehabilitation of patients with chronic schizophrenia.

  14. Climate uniformity: its influence on team communication quality, task conflict, and team performance.

    Science.gov (United States)

    González-Romá, Vicente; Hernández, Ana

    2014-11-01

    We investigated whether climate uniformity (the pattern of climate perceptions of organizational support within the team) is related to task conflict, team communication quality, and team performance. We used a sample composed of 141 bank branches and collected data at 3 time points. The results obtained showed that, after controlling for aggregate team climate, climate strength, and their interaction, a type of nonuniform climate pattern (weak dissimilarity) was directly related to task conflict and team communication quality. Teams with weak dissimilarity nonuniform patterns tended to show higher levels of task conflict and lower levels of team communication quality than teams with uniform climate patterns. The relationship between weak dissimilarity patterns and team performance was fully mediated by team communication quality. (PsycINFO Database Record (c) 2014 APA, all rights reserved).

  15. Team Building: Proven Strategies for Improving Team Performance, 4th Edition”

    Directory of Open Access Journals (Sweden)

    Greg Homan

    2008-12-01

    Full Text Available Team Building is an important issue for Youth Development professionals. We utilize team-focused work to achieve our objectives in educating youth. The team building skills we integrate into programming serve to prepare youth for the dynamic, highly interpersonal work environment of today. “Team Building: Proven Strategies for Improving Team Performance, 4th Edition,” by W. Dyer, W.G. Dyer, and J. Dyer (2007, provides a practical theoretical framework for those interested in team building application, training, and practice in everyday work.

  16. Using Existing Teams to Teach about Teams: How an MBA Course in Managing Teams Helps Students and the Program

    Science.gov (United States)

    Isabella, Lynn A.

    2005-01-01

    This article chronicles the unique manner in which a second-year MBA elective course in managing teams has been crafted using existing first-year learning teams as its core. The design and orchestration of this course are detailed, as are the challenges posed, in delivering a course that not only teaches about teams and team dynamics but does so…

  17. Sustainable Sport Scheduling Approach Considering Team Equity for the Korean Professional Baseball League

    Directory of Open Access Journals (Sweden)

    Young Dae Ko

    2018-02-01

    Full Text Available Since the Korea Baseball League (KBL had nine teams, an odd number, in the 2013 season, one team was unable to compete at certain times in the rotation while the other eight teams played games. Therefore, it was necessary to consider several elements to generate an annual match schedule in terms of team equity. However, the annual match schedule created by the conventional method could not fully reflect the elements regarding team equity, and there were a great many complaints from teams and fans. As a result, applying an optimization technique was decided upon to derive an efficient annual match schedule for the 2014 season. All the required conditions for scheduling are formulated as one or more equations and several parameter values concerning team equity are calculated with the related equations. Due to the complicated scheduling conditions, a sequential solution approach is applied by dividing the overall planning horizon in three parts. The derived annual match schedule was used for the 2014 season after some modifications, and the staff of the KBL was satisfied with the performance of the proposed scheduling methodology. Currently, this sustainable scheduling methodology is still in use to generate an efficient annual match schedule for the KBL.

  18. Using artificial team members for team training in virtual environments

    NARCIS (Netherlands)

    Diggelen, J. van; Muller, T.; Bosch, K. van den

    2010-01-01

    In a good team, members do not only perform their individual task, they also coordinate their actions with other members of the team. Developing such team skills usually involves exercises with all members playing their role. This approach is costly and has organizational and educational drawbacks.

  19. User evaluation of a GUI for controlling an autonomous persistent surveillance team

    Science.gov (United States)

    Scerri, Paul; Owens, Sean; Sycara, Katia; Lewis, Michael

    2010-04-01

    In future military missions, there will be many sensor assets collecting much important information about the environment. User control over surveillance assets is important to ensure that the specific data collected is appropriate for the current mission. Unfortunately, previous work has shown that individual users cannot effectively control more than about four assets, even if the assets have significant autonomy. In the ACCAST project, we hypothesized that by including autonomous teamwork between the assets and allowing users to interact by describing what the team as a whole and specific sub-teams should do, we could dramatically scale up the number of assets an individual user could effectively control. In this paper, we present the results of an experiment where users controlled up to 30 autonomous assets performing a complex mission. The assets autonomously worked together using sophisticated teamwork and the user could tell sub-teams to execute team oriented plans which described the steps required to achieve a team objective without describing exactly which asset performed which role and without having to specify how the team should handle routine information sharing, communications and failure circumstances. The users, soldiers from Fort Benning, were surprisingly good at managing the assets and were all able to complete the complex mission with extremely low friendly and civilian casualties.

  20. One Big Happy Family? Unraveling the Relationship between Shared Perceptions of Team Psychological Contracts, Person-Team Fit and Team Performance

    Directory of Open Access Journals (Sweden)

    Katherine Gibbard

    2017-11-01

    Full Text Available With the knowledge that team work is not always associated with high(er performance, we draw from the Multi-Level Theory of Psychological Contracts, Person-Environment Fit Theory, and Optimal Distinctiveness Theory to study shared perceptions of psychological contract (PC breach in relation to shared perceptions of complementary and supplementary fit to explain why some teams perform better than other teams. We collected three repeated survey measures in a sample of 128 respondents across 46 teams. After having made sure that we met all statistical criteria, we aggregated our focal variables to the team-level and analyzed our data by means of a longitudinal three-wave autoregressive moderated-mediation model in which each relationship was one-time lag apart. We found that shared perceptions of PC breach were directly negatively related to team output and negatively related to perceived team member effectiveness through a decrease in shared perceptions of supplementary fit. However, we also demonstrated a beneficial process in that shared perceptions of PC breach were positively related to shared perceptions of complementary fit, which in turn were positively related to team output. Moreover, best team output appeared in teams that could combine high shared perceptions of complementary fit with modest to high shared perceptions of supplementary fit. Overall, our findings seem to indicate that in terms of team output there may be a bright side to perceptions of PC breach and that perceived person-team fit may play an important role in this process.

  1. New simulated gas detector offers realistic training for mine rescue teams

    Energy Technology Data Exchange (ETDEWEB)

    Bealko, S.B.; Alexander, D.; Chasko, L.L. [National Inst. for Occupational Safety and Health, Pittsburgh, PA (United States). Office of Mine Safety and Health Research; Holtan, J. [LightsOn Safety Solutions, Spring, TX (United States)

    2010-07-01

    The National Institute for Occupational Safety and Health, together with LightsOn Safety Solutions, evaluated 2 versions of a multi-gas simulated gas monitor system (GMS) in separate field trials with mine rescue teams. This paper described the GMS wireless simulation tool along with its development and testing. It also described the GMS functions for the initial phase of testing as well as plans for the next phase of research which may introduce tracking and automation features. The GMS requires a personal computer and uses a wireless local area network. The GMS teaches mine rescue members about gas detection and helps them understand the importance of gas concentrations. In addition, it promotes decision-making actions by team members and offers a more realistic method of receiving gas concentration readings using a simulated hand-held gas detector. The purpose of the evaluation was to determine if the electronic placard in the GMS could be used by mine rescue teams instead of the currently used cardboard placards, and if the functionality of the device was suitable, reliable and practical. Results from the second field trial demonstrated improvements with the GMS over the original prototype technology, particularly with regards to wireless and connectivity issues. The GMS was successfully incorporated into the mine rescue exercises as planned, with very few problems encountered. 4 refs., 2 figs.

  2. New simulated gas detector offers realistic training for mine rescue teams

    International Nuclear Information System (INIS)

    Bealko, S.B.; Alexander, D.; Chasko, L.L.

    2010-01-01

    The National Institute for Occupational Safety and Health, together with LightsOn Safety Solutions, evaluated 2 versions of a multi-gas simulated gas monitor system (GMS) in separate field trials with mine rescue teams. This paper described the GMS wireless simulation tool along with its development and testing. It also described the GMS functions for the initial phase of testing as well as plans for the next phase of research which may introduce tracking and automation features. The GMS requires a personal computer and uses a wireless local area network. The GMS teaches mine rescue members about gas detection and helps them understand the importance of gas concentrations. In addition, it promotes decision-making actions by team members and offers a more realistic method of receiving gas concentration readings using a simulated hand-held gas detector. The purpose of the evaluation was to determine if the electronic placard in the GMS could be used by mine rescue teams instead of the currently used cardboard placards, and if the functionality of the device was suitable, reliable and practical. Results from the second field trial demonstrated improvements with the GMS over the original prototype technology, particularly with regards to wireless and connectivity issues. The GMS was successfully incorporated into the mine rescue exercises as planned, with very few problems encountered. 4 refs., 2 figs.

  3. Sport-specific nutrition: practical strategies for team sports.

    Science.gov (United States)

    Holway, Francis E; Spriet, Lawrence L

    2011-01-01

    Implementation of a nutrition programme for team sports involves application of scientific research together with the social skills necessary to work with a sports medicine and coaching staff. Both field and court team sports are characterized by intermittent activity requiring a heavy reliance on dietary carbohydrate sources to maintain and replenish glycogen. Energy and substrate demands are high during pre-season training and matches, and moderate during training in the competitive season. Dietary planning must include enough carbohydrate on a moderate energy budget, while also meeting protein needs. Strength and power team sports require muscle-building programmes that must be accompanied by adequate nutrition, and simple anthropometric measurements can help the nutrition practitioner monitor and assess body composition periodically. Use of a body mass scale and a urine specific gravity refractometer can help identify athletes prone to dehydration. Sports beverages and caffeine are the most common supplements, while opinion on the practical effectiveness of creatine is divided. Late-maturing adolescent athletes become concerned about gaining size and muscle, and assessment of maturity status can be carried out with anthropometric procedures. An overriding consideration is that an individual approach is needed to meet each athlete's nutritional needs.

  4. Crisis management teams in health organisations.

    Science.gov (United States)

    Canyon, Deon V

    2012-01-01

    Crisis management teams (CMT) are necessary to ensure adequate and appropriate crisis management planning and response to unforeseen, adverse events. This study investigated the existence of CMTs, the membership of CMTs, and the degree of training received by CMTs in Australian health and allied health organisations. This cross-sectional study draws on data provided by executive decision makers in a broad selection of health and allied health organisations. Crisis management teams were found in 44.2 per cent of the health-related organisations surveyed, which is ten per cent lower than the figure for business organisations. Membership of these CMTs was not ideal and did not conform to standard CMT membership profiles. Similarly, the extent of crisis management training in health-related organisations is 20 per cent lower than the figure for business organisations. If organisations do not become pro-active in their crisis management practices, the onus is on government to improve the situation through regulation and the provision of more physical, monetary and skill resources to ensure that the health services of Australia are sufficiently prepared to respond to adverse events.

  5. Teams as innovative systems: multilevel motivational antecedents of innovation in R&D teams.

    Science.gov (United States)

    Chen, Gilad; Farh, Jiing-Lih; Campbell-Bush, Elizabeth M; Wu, Zhiming; Wu, Xin

    2013-11-01

    Integrating theories of proactive motivation, team innovation climate, and motivation in teams, we developed and tested a multilevel model of motivators of innovative performance in teams. Analyses of multisource data from 428 members of 95 research and development (R&D) teams across 33 Chinese firms indicated that team-level support for innovation climate captured motivational mechanisms that mediated between transformational leadership and team innovative performance, whereas members' motivational states (role-breadth self-efficacy and intrinsic motivation) mediated between proactive personality and individual innovative performance. Furthermore, individual motivational states and team support for innovation climate uniquely promoted individual innovative performance, and, in turn, individual innovative performance linked team support for innovation climate to team innovative performance. (c) 2013 APA, all rights reserved.

  6. Study on team evaluation (4). Reliability and validity of questionnaire survey-based team work evaluation method of power plant operator team

    International Nuclear Information System (INIS)

    Sasou, Kunihide; Hirose, Ayako; Misawa, Ryou; Yamaguchi, Hiroyuki

    2006-01-01

    The series of this study describes the necessity of the evaluation of team work from two aspects of operator's behavior and operators' mind. The authors propose Team Work Element Model which consists of necessary elements to build high performance team. This report discusses a method to evaluate team work from the second aspect, that is, competency trust, competition, for-the team spirit, etc. The authors survey the previous studies on psychological measures and organize a set of questions to evaluate 10 team work sub elements that are the parts of Team Work Element Model. The factor analysis shows that this set of questions is consists of 13 factors such as task-oriented leadership, harmony-oriented team atmosphere, etc. Close examination of the questions in each factor shows that 8 of 10 team work sub elements can be evaluated by this questionnaire. In addition, this questionnaire comprises scales additional 8 scales such as job satisfaction, leadership, etc. As a result, it is possible to evaluate team work from more comprehensive view points. (author)

  7. Formation of the Project Team on Introduction of Financial Controlling into Banking Activity

    Directory of Open Access Journals (Sweden)

    Chmutova Iryna M.

    2014-01-01

    Full Text Available The article identifies order and content of stages of formation of the project team of introduction of financial controlling into banking activity. It offers a procedure of identification of the qualitative team composition, which envisages selection of candidates with the use of rules of fuzzy logical conclusion for assessing three groups of competences: personal (initiative, communication ability, creative ability, purposefulness and responsibility; common managerial (ability to work in a team, ability to manage conflicts, ability to manage, strategic thinking ability, ability to plan team work and distribute rights and obligations and co-ordinate work; special managerial (ability to justify and make decisions under conditions of uncertainty and dynamism, analytical abilities, ability to master new directions and methods of work and use them, skills and ability to form justified recommendations, special knowledge – theoretical grounds and recommendations of modern science with respect to introduction of controlling.

  8. Water Cycle Missions for the Next Decade

    Science.gov (United States)

    Houser, P. R.

    2013-12-01

    The global water cycle describes the circulation of water as a vital and dynamic substance in its liquid, solid, and vapor phases as it moves through the atmosphere, oceans and land. Life in its many forms exists because of water, and modern civilization depends on learning how to live within the constraints imposed by the availability of water. The scientific challenge posed by the need to observe the global water cycle is to integrate in situ and space-borne observations to quantify the key water-cycle state variables and fluxes. The vision to address that challenge is a series of Earth observation missions that will measure the states, stocks, flows, and residence times of water on regional to global scales followed by a series of coordinated missions that will address the processes, on a global scale, that underlie variability and changes in water in all its three phases. The accompanying societal challenge is to foster the improved use of water data and information as a basis for enlightened management of water resources, to protect life and property from effects of extremes in the water cycle. A major change in thinking about water science that goes beyond its physics to include its role in ecosystems and society is also required. Better water-cycle observations, especially on the continental and global scales, will be essential. Water-cycle predictions need to be readily available globally to reduce loss of life and property caused by water-related natural hazards. Building on the 2007 Earth Science Decadal Survey, NASA's Plan for a Climate-Centric Architecture for Earth Observations and Applications from Space , and the 2012 Chapman Conference on Remote Sensing of the Terrestrial Water Cycle, a workshop was held in April 2013 to gather wisdom and determine how to prepare for the next generation of water cycle missions in support of the second Earth Science Decadal Survey. This talk will present the outcomes of the workshop including the intersection between

  9. Applying TEAM in Regional Sketch Planning: Three Case Studies in Atlanta, Orlando, St. Louis

    Science.gov (United States)

    This EPA report documents 3 case studies of the application of TEAM (Travel Efficiency Assessment Method) to develop, assess and quantify regional greenhouse gas and criteria pollutant emission reductions from travel efficiency strategies in a cost effecti

  10. Does team stability mediate the relationship between leadership and team learning? An empirical study among Dutch project teams

    NARCIS (Netherlands)

    Savelsbergh, Chantal M.J.H.; Poell, Rob F.; van der Heijden, Beatrice

    2014-01-01

    An exploratory field study was conducted among 30 project teams in the sectors of building and utilities, engineering and construction, infrastructure, and area decontamination and development in the Netherlands. It examined the influence of leadership on team learning behaviors and included team

  11. Does team stability mediate the relationship between leadership and team learning? : An empirical study among Dutch project teams

    NARCIS (Netherlands)

    Savelsbergh, C.; Poell, R.F.; van der Heijden, B.

    2015-01-01

    An exploratory field study was conducted among 30 project teams in the sectors of building and utilities, engineering and construction, infrastructure, and area decontamination and development in the Netherlands. It examined the influence of leadership on team learning behaviors and included team

  12. Using team cognitive work analysis to reveal healthcare team interactions in a birthing unit.

    Science.gov (United States)

    Ashoori, Maryam; Burns, Catherine M; d'Entremont, Barbara; Momtahan, Kathryn

    2014-01-01

    Cognitive work analysis (CWA) as an analytical approach for examining complex sociotechnical systems has shown success in modelling the work of single operators. The CWA approach incorporates social and team interactions, but a more explicit analysis of team aspects can reveal more information for systems design. In this paper, Team CWA is explored to understand teamwork within a birthing unit at a hospital. Team CWA models are derived from theories and models of teamwork and leverage the existing CWA approaches to analyse team interactions. Team CWA is explained and contrasted with prior approaches to CWA. Team CWA does not replace CWA, but supplements traditional CWA to more easily reveal team information. As a result, Team CWA may be a useful approach to enhance CWA in complex environments where effective teamwork is required. This paper looks at ways of analysing cognitive work in healthcare teams. Team Cognitive Work Analysis, when used to supplement traditional Cognitive Work Analysis, revealed more team information than traditional Cognitive Work Analysis. Team Cognitive Work Analysis should be considered when studying teams.

  13. Using team cognitive work analysis to reveal healthcare team interactions in a birthing unit

    Science.gov (United States)

    Ashoori, Maryam; Burns, Catherine M.; d'Entremont, Barbara; Momtahan, Kathryn

    2014-01-01

    Cognitive work analysis (CWA) as an analytical approach for examining complex sociotechnical systems has shown success in modelling the work of single operators. The CWA approach incorporates social and team interactions, but a more explicit analysis of team aspects can reveal more information for systems design. In this paper, Team CWA is explored to understand teamwork within a birthing unit at a hospital. Team CWA models are derived from theories and models of teamworkand leverage the existing CWA approaches to analyse team interactions. Team CWA is explained and contrasted with prior approaches to CWA. Team CWA does not replace CWA, but supplements traditional CWA to more easily reveal team information. As a result, Team CWA may be a useful approach to enhance CWA in complex environments where effective teamwork is required. Practitioner Summary: This paper looks at ways of analysing cognitive work in healthcare teams. Team Cognitive Work Analysis, when used to supplement traditional Cognitive Work Analysis, revealed more team information than traditional Cognitive Work Analysis. Team Cognitive Work Analysis should be considered when studying teams PMID:24837514

  14. The pediatrician's role in development and implementation of an Individual Education Plan (IEP) and/or an Individual Family Service Plan (IFSP). American Academy of Pediatrics. Committee on Children with Disabilities.

    Science.gov (United States)

    1999-07-01

    The Individual Education Plan and Individual Family Service Plan are legally mandated documents developed by a multidisciplinary team assessment that specifies goals and services for each child eligible for special educational services or early intervention services. Pediatricians need to be knowledgeable of federal, state, and local requirements; establish linkages with early intervention, educational professionals, and parent support groups; and collaborate with the team working with individual children.

  15. Quality charters or quality members? A control theory perspective on team charters and team performance.

    Science.gov (United States)

    Courtright, Stephen H; McCormick, Brian W; Mistry, Sal; Wang, Jiexin

    2017-10-01

    Though prevalent in practice, team charters have only recently received scholarly attention. However, most of this work has been relatively devoid of theory, and consequently, key questions about why and under what conditions team charter quality affects team performance remain unanswered. To address these gaps, we draw on macro organizational control theory to propose that team charter quality serves as a team-level "behavior" control mechanism that builds task cohesion through a structured exercise. We then juxtapose team charter quality with an "input" team control mechanism that influences the emergence of task cohesion more organically: team conscientiousness. Given their redundant effects on task cohesion, we propose that the effects of team charter quality and team conscientiousness on team performance (through task cohesion) are substitutive such that team charter quality primarily impacts team performance for teams that are low (vs. high) on conscientiousness. We test and find support for our hypotheses in a sample of 239 undergraduate self-managing project teams. Our study contributes to the groups and teams literature in the following ways: first, relative to previous studies, we take a more theory-driven approach toward understanding team charters, and in doing so, uncover when and why team charter quality impacts team performance; second, we integrate two normally disparate perspectives on team effectiveness (team development and team selection) to offer a broader perspective on how teams are "built"; and third, we introduce team charter quality as a performance-enhancing mechanism for teams lower on conscientiousness. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  16. Managing a Product Development Team

    Science.gov (United States)

    Lehtonen, Kenneth E.; Barrett, Larry

    2003-01-01

    Orbiting 380 miles above the earth, NASA s Hubble Space Telescope (HST) has returned a wealth of scientific data about our universe and galaxies beyond highlighted by spectacular images of the birth and death of stars, colliding galaxies, and other extra-worldly events. Despite its tremendous success for almost two decades, the HST ground support system experienced down-to-earth problems prior to the turn of the century, namely budgetary ones. To keep HST operating efficiently to 201 2 and beyond, the Vision 2000 project was conceived with the primary goal of substantially reducing the costs of operating and maintaining the spacecraft ground systems. Taking advantage of this atypical management opportunity, a set of Product Development Teams (PDTs) were established, whose charter was to re-engineer the ground system, and in doing so, reduce the remaining life-of-mission operating and maintenance costs, while providing improved reliability and increased capabilities.

  17. A landscape analysis plan

    Science.gov (United States)

    Nancy E. Fleenor

    2002-01-01

    A Landscape Analysis Plan (LAP) sets out broad guidelines for project development within boundaries of the Kings River Sustainable Forest Ecosystems Project. The plan must be a dynamic, living document, subject to change as new information arises over the course of this very long-term project (several decades). Two watersheds, each of 32,000 acres, were dedicated to...

  18. Team health, an assessment approach to engage first year students in cross-cultural and cross-discipline teams towards more effective team-working

    Directory of Open Access Journals (Sweden)

    Kathy Egea

    Full Text Available Specialists who work in a globalised environment, need to work in teams, if they are to be continuously effective. The challenge for IT educators is to design and implement inter-cultural teamwork practices into their curriculum. Investigating this challenge, this case study describes Team Health, an assessment approach designed to skill students to be more effective in team working in cross-cultural and cross-discipline teams. The educational context is teamwork practice within a first year introductory web design course. Framed by Saunders\\'s virtual team lifecycle model (relationship building and team processes and Hofstede\\'s cultural dimensions (communication and working cross-culturally, the assessment approach utilises reflective and iterative strategies to support team working. At three points in the semester, students complete a survey on these four concepts, identify team strengths and weaknesses from the results of the surveys and work towards addressing one team weakness. The final assessment activity requires students to reflect on team working for the semester. Key attributes for effective team working are identified from the three surveys and the final reflective summaries. This paper compares course outcomes such as team cohesion and student grades to the previous course offering and shows that with the introduction of Team Health, the more complex student cohorts under this study achieve equally well. It is concluded that the guided reflective practices underpinning Team Health can prepare students for first year approaches to teamwork, and thereby provide starting points for working in future global teams where members are both culturally diverse and from different discipline areas.

  19. Change champions at the grassroots level: practice innovation using team process.

    Science.gov (United States)

    Scott, J; Rantz, M

    1994-01-01

    A nursing administrative group recognized the critical value of staff participation in the formulation of a restructuring project and guidance throughout the project. Using a team approach, a task force of three staff nurses, two assistant nurse managers, a nurse clinician, a nursing practice specialist, and a representative from nursing administration came together. They were given responsibility for researching and setting the course for restructuring change. A unit-based team including a unit secretary, a nursing attendant, licensed practical nurse (LPN), and six staff nurses was formed from volunteers from the 40-bed medicine unit to develop that unit's plan for restructuring. The unit-based team analyzed patient care needs and staff member roles. They created a new patient care technician role as well as a nurse care coordinator role. The role of the LPN was envisioned as providing technical support. Staffing mix was also determined by the unit-based team. Both the task force and the unit-based team continue to evaluate, troubleshoot, and take every opportunity to sell their vision to solidify it further as the foundation for the future of patient care services at the hospital. The process will soon move forward to a large surgical unit.

  20. The International Space Life Sciences Strategic Planning Working Group

    Science.gov (United States)

    White, Ronald J.; Rabin, Robert; Lujan, Barbara F.

    1993-01-01

    Throughout the 1980s, ESA and the space agencies of Canada, Germany, France, Japan, and the U.S. have pursued cooperative projects bilaterally and multilaterally to prepare for, and to respond to, opportunities in space life sciences research previously unapproachable in scale and sophistication. To cope effectively with likely future space research opportunities, broad, multilateral, coordinated strategic planning is required. Thus, life scientists from these agencies have allied to form the International Space Life Sciences Strategic Planning Working Group. This Group is formally organized under a charter that specifies the purpose of the Working Group as the development of an international strategic plan for the space life sciences, with periodic revisions as needed to keep the plan current. The plan will be policy-, not operations-oriented. The Working Group also may establish specific implementation teams to coordinate multilateral science policy in specific areas; such teams have been established for space station utilization, and for sharing of flight equipment.

  1. The Relationships between Work Team Strategic Intent and Work Team Performance

    National Research Council Canada - National Science Library

    Edison, Thomas R

    2007-01-01

    ...) executive level, six- week program management class in six different locations. The study not only underscores the significance of team focus on performance but also highlights how team characteristics affect team focus and performance...

  2. Public affairs plan

    International Nuclear Information System (INIS)

    1995-09-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Public Affairs Plan is to establish goals for the fiscal year (FY) 1996 UMTRA Project public affairs program and to identify specific activities to be conducted during the year. It describes the roles of various agencies involved in the public affairs program and defines the functions of the UMTRA Project Technical Assistance Contractor (TAC) Public Affairs Department. It replaces the FY 1995 Public Affairs Plan (DOE/AL/62350-154). The plan also describes the US Department of Energy's (DOE) plans to keep stakeholders and other members of the public informed about UMTRA Project policies, plans, and activities, and provide opportunities for stakeholders and interested segments of the public to participate in UMTRA Project decision-making processes. The plan applies to the UMTRA Project Team; the DOE Grand Junction Projects Office (GJPO); the DOE Albuquerque Operations Office, Office of Public Affairs (OPA); the TAC; the UMTRA Project Remedial Action Contractor (RAC); and other cooperating agencies

  3. Developing standardized facility contingency plans

    International Nuclear Information System (INIS)

    Davidson, D.A.

    1993-01-01

    Texaco consists of several operating departments that are, in effect, independent companies. Each of these departments is responsible for complying with all environmental laws and regulations. This includes the preparation by each facility to respond to an oil spill at that location. For larger spills, however, management of the response will rest with corporate regional response teams. Personnel from all departments make up the regional teams. In 1990, Congress passed the Oil Pollution Act. In 1991, the US Coast Guard began developing oil spill response contingency plan regulations, which they are still working on. Meanwhile, four of the five west coast states have also passed laws requiring contingency plans. (Only Hawaii has chosen to wait and see what the federal regulations will entail). Three of the states have already adopted regulations. Given these laws and regulations, along with its corporate structure, Texaco addressed the need to standardize local facility plans as well as its response organization. This paper discusses how, by working together, the Texaco corporate international oil spill response staff and the Texaco western region on-scene commander developed: A standard contingency plan format crossing corporate boundaries and meeting federal and state requirements. A response organization applicable to any size facility or spill. A strategy to sell the standard contingency plan and response organization to the operating units

  4. Summary of Prioritized Research Opportunities: Building America Program Planning Meeting, Washington, D.C., November 2-4, 2010

    Energy Technology Data Exchange (ETDEWEB)

    2011-02-01

    This report outlines the results of brainstorming sessions conducted at the Building America Fall 2010 planning meeting, in which research teams and national laboratories identified key research priorities to incorporate into multi-year planning, team research agendas, expert meetings, and technical standing committees.

  5. Wide-Field Astronomical Surveys in the Next Decade

    Energy Technology Data Exchange (ETDEWEB)

    Strauss, Michael A.; /Princeton U.; Tyson, J.Anthony; /UC, Davis; Anderson, Scott F.; /Washington U., Seattle, Astron. Dept.; Axelrod, T.S.; /LSST Corp.; Becker, Andrew C.; /Washington U., Seattle, Astron. Dept.; Bickerton, Steven J.; /Princeton U.; Blanton, Michael R.; /New York U.; Burke, David L.; /SLAC; Condon, J.J.; /NRAO, Socorro; Connolly, A.J.; /Washington U., Seattle, Astron. Dept.; Cooray, Asantha R.; /UC, Irvine; Covey, Kevin R.; /Harvard U.; Csabai, Istvan; /Eotvos U.; Ferguson, Henry C.; /Baltimore, Space Telescope Sci.; Ivezic, Zeljko; /Washington U., Seattle, Astron. Dept.; Kantor, Jeffrey; /LSST Corp.; Kent, Stephen M.; /Fermilab; Knapp, G.R.; /Princeton U.; Myers, Steven T.; /NRAO, Socorro; Neilsen, Eric H., Jr.; /Fermilab; Nichol, Robert C.; /Portsmouth U., ICG /Harish-Chandra Res. Inst. /Caltech, IPAC /Potsdam, Max Planck Inst. /Harvard U. /Hawaii U. /UC, Berkeley, Astron. Dept. /Baltimore, Space Telescope Sci. /NOAO, Tucson /Carnegie Mellon U. /Chicago U., Astron. Astrophys. Ctr.

    2011-11-14

    Wide-angle surveys have been an engine for new discoveries throughout the modern history of astronomy, and have been among the most highly cited and scientifically productive observing facilities in recent years. This trend is likely to continue over the next decade, as many of the most important questions in astrophysics are best tackled with massive surveys, often in synergy with each other and in tandem with the more traditional observatories. We argue that these surveys are most productive and have the greatest impact when the data from the surveys are made public in a timely manner. The rise of the 'survey astronomer' is a substantial change in the demographics of our field; one of the most important challenges of the next decade is to find ways to recognize the intellectual contributions of those who work on the infrastructure of surveys (hardware, software, survey planning and operations, and databases/data distribution), and to make career paths to allow them to thrive.

  6. We will be champions: Leaders' confidence in 'us' inspires team members' team confidence and performance.

    Science.gov (United States)

    Fransen, K; Steffens, N K; Haslam, S A; Vanbeselaere, N; Vande Broek, G; Boen, F

    2016-12-01

    The present research examines the impact of leaders' confidence in their team on the team confidence and performance of their teammates. In an experiment involving newly assembled soccer teams, we manipulated the team confidence expressed by the team leader (high vs neutral vs low) and assessed team members' responses and performance as they unfolded during a competition (i.e., in a first baseline session and a second test session). Our findings pointed to team confidence contagion such that when the leader had expressed high (rather than neutral or low) team confidence, team members perceived their team to be more efficacious and were more confident in the team's ability to win. Moreover, leaders' team confidence affected individual and team performance such that teams led by a highly confident leader performed better than those led by a less confident leader. Finally, the results supported a hypothesized mediational model in showing that the effect of leaders' confidence on team members' team confidence and performance was mediated by the leader's perceived identity leadership and members' team identification. In conclusion, the findings of this experiment suggest that leaders' team confidence can enhance members' team confidence and performance by fostering members' identification with the team. © 2015 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  7. Developing high-performance cross-functional teams: Understanding motivations, functional loyalties, and teaming fundamentals

    Energy Technology Data Exchange (ETDEWEB)

    Miller, M.A.

    1996-08-01

    Teamwork is the key to the future of effective technology management. Today`s technologies and markets have become too complex for individuals to work alone. Global competition, limited resources, cost consciousness, and time pressures have forced organizations and project managers to encourage teamwork. Many of these teams will be cross-functional teams that can draw on a multitude of talents and knowledge. To develop high-performing cross-functional teams, managers must understand motivations, functional loyalties, and the different backgrounds of the individual team members. To develop a better understanding of these issues, managers can learn from experience and from literature on teams and teaming concepts. When studying the literature to learn about cross-functional teaming, managers will find many good theoretical concepts, but when put into practice, these concepts have varying effects. This issue of varying effectiveness is what drives the research for this paper. The teaming concepts were studied to confirm or modify current understanding. The literature was compared with a {open_quotes}ground truth{close_quotes}, a survey of the reality of teaming practices, to examine the teaming concepts that the literature finds to be critical to the success of teams. These results are compared to existing teams to determine if such techniques apply in real-world cases.

  8. The Importance of Team Sex Composition in Team-Training Research Employing Complex Psychomotor Tasks.

    Science.gov (United States)

    Jarrett, Steven M; Glaze, Ryan M; Schurig, Ira; Arthur, Winfred

    2017-08-01

    The relationship between team sex composition and team performance on a complex psychomotor task was examined because these types of tasks are commonly used in the lab-based teams literature. Despite well-documented sex-based differences on complex psychomotor tasks, the preponderance of studies-mainly lab based-that use these tasks makes no mention of the sex composition of teams across or within experimental conditions. A sample of 123 four-person teams with varying team sex composition learned and performed a complex psychomotor task, Steal Beasts Pro PE. Each team completed a 5-hr protocol whereby they conducted several performance missions. The results indicated significant large mean differences such that teams with larger proportions of males had higher performance scores. These findings demonstrate the potential effect of team sex composition on the validity of studies that use complex psychomotor tasks to explore and investigate team performance-related phenomena when (a) team sex composition is not a focal variable of interest and (b) it is not accounted for or controlled. Given the proclivity of complex psychomotor action-based tasks used in lab-based team studies, it is important to understand and control for the impact of team sex composition on team performance. When team sex composition is not controlled for, either methodologically or statistically, it may affect the validity of the results in teams studies using these types of tasks.

  9. Site scientific mission plan for the Southern Great Plains CART site: July--December 1997

    Energy Technology Data Exchange (ETDEWEB)

    Peppler, R.A.; Lamb, P.J. [Univ. of Oklahoma, Norman, OK (United States). Cooperative Inst. for Mesoscale Meteorological Studies; Sisterson, D.L. [Argonne National Lab., IL (United States). Environmental Research Div.

    1997-07-01

    The Southern Great Plains (SGP) Cloud and Radiation Testbed (CART) site is designed to help satisfy the data needs of the Atmospheric Radiation Measurement (ARM) Program Science Team. This document defines the scientific priorities for site activities during the six months beginning on July 1, 1997, and looks forward in lesser detail to subsequent six-month periods. The primary purpose of this Site Scientific Mission Plan is to provide guidance for the development of plans for site operations. It also provides information on current plans to the ARM functional teams and serves to disseminate the plans more generally within the ARM Program and among the members of the Science Team. This document includes a description of the operational status of the site and the primary site activities envisioned, together with information concerning approved and proposed intensive observation periods (IOPs). This plan is a living document that is updated and reissued every six months as the observational facilities are developed, tested, and augmented and as priorities are adjusted in response to developments in scientific planning and understanding.

  10. The impact of team characteristics and context on team communication: An integrative literature review.

    Science.gov (United States)

    Tiferes, Judith; Bisantz, Ann M

    2018-04-01

    Many studies on teams report measures of team communication; however, these studies vary widely in terms of the team characteristics, situations, and tasks studied making it difficult to understand impacts on team communication more generally. The objective of this review is systematically summarize relationships between measures of team communication and team characteristics and situational contexts. A literature review was conducted searching in four electronic databases (PsycINFO, MEDLINE, Ergonomics Abstracts, and SocINDEX). Additional studies were identified by cross-referencing. Articles included for final review had reported at least one team communication measure associated with some team and/or context dimension. Ninety-nine of 727 articles met the inclusion criteria. Data extracted from articles included characteristics of the studies and teams and the nature of each of the reported team and/or context dimensions-team communication properties relationships. Some dimensions (job role, situational stressors, training strategies, cognitive artifacts, and communication media) were found to be consistently linked to changes in team communication. A synthesized diagram that describes the possible associations between eleven team and context dimensions and nine team communication measures is provided along with research needs. Copyright © 2017 Elsevier Ltd. All rights reserved.

  11. Toward Learning Teams

    DEFF Research Database (Denmark)

    Hoda, Rashina; Babb, Jeff; Nørbjerg, Jacob

    2013-01-01

    to sacrifice learning-focused practices. Effective learning under pressure involves conscious efforts to implement original agile practices such as retrospectives and adapted strategies such as learning spikes. Teams, their management, and customers must all recognize the importance of creating learning teams......Today's software development challenges require learning teams that can continuously apply new engineering and management practices, new and complex technical skills, cross-functional skills, and experiential lessons learned. The pressure of delivering working software often forces software teams...

  12. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  13. Task versus relationship conflict, team performance, and team member satisfaction: a meta-analysis.

    Science.gov (United States)

    De Dreu, Carsten K W; Weingart, Laurie R

    2003-08-01

    This study provides a meta-analysis of research on the associations between relationship conflict, task conflict, team performance, and team member satisfaction. Consistent with past theorizing, results revealed strong and negative correlations between relationship conflict, team performance, and team member satisfaction. In contrast to what has been suggested in both academic research and introductory textbooks, however, results also revealed strong and negative (instead of the predicted positive) correlations between task conflict team performance, and team member satisfaction. As predicted, conflict had stronger negative relations with team performance in highly complex (decision making, project, mixed) than in less complex (production) tasks. Finally, task conflict was less negatively related to team performance when task conflict and relationship conflict were weakly, rather than strongly, correlated.

  14. Transfer of communication skills to the workplace: impact of a 38-hour communication skills training program designed for radiotherapy teams.

    Science.gov (United States)

    Merckaert, Isabelle; Delevallez, France; Gibon, Anne-Sophie; Liénard, Aurore; Libert, Yves; Delvaux, Nicole; Marchal, Serge; Etienne, Anne-Marie; Bragard, Isabelle; Reynaert, Christine; Slachmuylder, Jean-Louis; Scalliet, Pierre; Van Houtte, Paul; Coucke, Philippe; Razavi, Darius

    2015-03-10

    This study assessed the efficacy of a 38-hour communication skills training program designed to train a multidisciplinary radiotherapy team. Four radiotherapy teams were randomly assigned to a training program or a waiting list. Assessments were scheduled at baseline and after training for the training group and at baseline and 4 months later for the waiting list group. Assessments included an audio recording of a radiotherapy planning session to assess team members' communication skills and expression of concerns of patients with breast cancer (analyzed with content analysis software) and an adapted European Organisation for Research and Treatment of Cancer satisfaction with care questionnaire completed by patients at the end of radiotherapy. Two hundred thirty-seven radiotherapy planning sessions were recorded. Compared with members of the untrained teams, members of the trained teams acquired, over time, more assessment skills (P = .003) and more supportive skills (P = .050) and provided more setting information (P = .010). Over time, patients interacting with members of the trained teams asked more open questions (P = .022), expressed more emotional words (P = .025), and exhibited a higher satisfaction level regarding nurses' interventions (P = .028). The 38-hour training program facilitated transfer of team member learned communication skills to the clinical practice and improved patients' satisfaction with care. © 2015 by American Society of Clinical Oncology.

  15. Team Sports

    Science.gov (United States)

    ... Games. USA Hockey offers additional information and resources. Softball It's not easy to field full teams of ... an annual tournament sponsored by the National Wheelchair Softball Association , where thirty or so teams show up ...

  16. Study on dynamic team performance evaluation methodology based on team situation awareness model

    International Nuclear Information System (INIS)

    Kim, Suk Chul

    2005-02-01

    The purpose of this thesis is to provide a theoretical framework and its evaluation methodology of team dynamic task performance of operating team at nuclear power plant under the dynamic and tactical environment such as radiological accident. This thesis suggested a team dynamic task performance evaluation model so called team crystallization model stemmed from Endsely's situation awareness model being comprised of four elements: state, information, organization, and orientation and its quantification methods using system dynamics approach and a communication process model based on a receding horizon control approach. The team crystallization model is a holistic approach for evaluating the team dynamic task performance in conjunction with team situation awareness considering physical system dynamics and team behavioral dynamics for a tactical and dynamic task at nuclear power plant. This model provides a systematic measure to evaluate time-dependent team effectiveness or performance affected by multi-agents such as plant states, communication quality in terms of transferring situation-specific information and strategies for achieving the team task goal at given time, and organizational factors. To demonstrate the applicability of the proposed model and its quantification method, the case study was carried out using the data obtained from a full-scope power plant simulator for 1,000MWe pressurized water reactors with four on-the-job operating groups and one expert group who knows accident sequences. Simulated results team dynamic task performance with reference key plant parameters behavior and team-specific organizational center of gravity and cue-and-response matrix illustrated good symmetry with observed value. The team crystallization model will be useful and effective tool for evaluating team effectiveness in terms of recruiting new operating team for new plant as cost-benefit manner. Also, this model can be utilized as a systematic analysis tool for

  17. Study on dynamic team performance evaluation methodology based on team situation awareness model

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Suk Chul

    2005-02-15

    The purpose of this thesis is to provide a theoretical framework and its evaluation methodology of team dynamic task performance of operating team at nuclear power plant under the dynamic and tactical environment such as radiological accident. This thesis suggested a team dynamic task performance evaluation model so called team crystallization model stemmed from Endsely's situation awareness model being comprised of four elements: state, information, organization, and orientation and its quantification methods using system dynamics approach and a communication process model based on a receding horizon control approach. The team crystallization model is a holistic approach for evaluating the team dynamic task performance in conjunction with team situation awareness considering physical system dynamics and team behavioral dynamics for a tactical and dynamic task at nuclear power plant. This model provides a systematic measure to evaluate time-dependent team effectiveness or performance affected by multi-agents such as plant states, communication quality in terms of transferring situation-specific information and strategies for achieving the team task goal at given time, and organizational factors. To demonstrate the applicability of the proposed model and its quantification method, the case study was carried out using the data obtained from a full-scope power plant simulator for 1,000MWe pressurized water reactors with four on-the-job operating groups and one expert group who knows accident sequences. Simulated results team dynamic task performance with reference key plant parameters behavior and team-specific organizational center of gravity and cue-and-response matrix illustrated good symmetry with observed value. The team crystallization model will be useful and effective tool for evaluating team effectiveness in terms of recruiting new operating team for new plant as cost-benefit manner. Also, this model can be utilized as a systematic analysis tool for

  18. Attributions by Team Members for Team Outcomes in Finnish Working Life

    OpenAIRE

    Valo, Maarit; Hurme, Pertti

    2010-01-01

    This study focuses on teamwork in Finnish working life. Through a wide cross-section of teams the study examines the causes to which team members attribute the outcomes of their teams. Qualitative data was collected from 314 respondents. They wrote 616 stories to describe memorable experiences of success and failure in teamwork. The stories revealed 1930 explanations. The findings indicate that both favorable and unfavorable team outcomes are perceived as being caused by ...

  19. High Burnup Dry Storage Cask Research and Development Project, Final Test Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-02-27

    EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.

  20. A decade in diabetes specialist services, 2000 to 2011, in England: the views of consultant diabetologists and diabetes specialist nurses amidst persistent healthcare delivery change.

    Science.gov (United States)

    Gosden, C A; Barnard, K; Williams, D R R; Tinati, T; Turner, B; Holt, R I G

    2015-12-01

    To assess the impact of continual major National Health Service reorganization on commissioning, organizational and delivery arrangements for secondary care diabetes services. To explore how consultant diabetologists and diabetes specialist nurses perceive the issues facing diabetes specialist services in 2011 and how these have changed in the preceding decade. We used a longitudinal case study approach that combined quantitative and qualitative methods. Five locations in England were purposively selected to represent the wider diabetes specialist community, and seven semi-structured interviews were conducted. Interviews were recorded, transcribed verbatim and analysed using Framework analysis. Findings were compared with and contrasted to results from national quantitative surveys of diabetes specialist services undertaken in 2000 and 2006. Clinicians viewed positively the expertise and commitment of multidisciplinary teams and their ability to adapt to new situations. Negative perceptions persisted throughout the decade, relating to the continual change that threatens to dismantle relationships and services which had taken many years to establish. Lack of resources, inadequate manpower planning and poor access to psychological support for people with diabetes remained constant themes from 2000 to 2011. A willingness to innovate and work differently to improve services was identified; however, clinicians must be supported through organizational changes to ensure people with diabetes receive high-quality care. The disruptive nature of organizational change was a recurrent theme throughout the decade. Periods of stability must exist within commissioning to allow relationships, which are key to integration, to be maintained and permit service improvements to develop. © 2015 The Authors. Diabetic Medicine © 2015 Diabetes UK.

  1. 42 CFR 460.106 - Plan of care.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Plan of care. 460.106 Section 460.106 Public Health... ALL-INCLUSIVE CARE FOR THE ELDERLY (PACE) PROGRAMS OF ALL-INCLUSIVE CARE FOR THE ELDERLY (PACE) PACE Services § 460.106 Plan of care. (a) Basic requirement. The interdisciplinary team must promptly develop a...

  2. Strategic Planning: What's so Strategic about It?

    Science.gov (United States)

    Strong, Bart

    2005-01-01

    The words "strategic" and "planning" used together can lead to confusion unless one spent the early years of his career in never-ending, team-oriented, corporate training sessions. Doesn't "strategic" have something to do with extremely accurate bombing or a defensive missile system or Star Wars or something? Don't "strategic" and "planning" both…

  3. Towards a European Energy Technology Policy - The European Strategic Energy Technology Plan (Set-Plan)

    International Nuclear Information System (INIS)

    Mercier, A.; Petric, H.; Peteves, E.

    2008-01-01

    The transition to a low carbon economy will take decades and affect the entire economy. There is a timely opportunity for investment in energy infrastructure. However, decisions to invest in technologies that are fully aligned with policy and society priorities do not necessarily come naturally, although it will profoundly affect the level of sustainability of the European energy system for decades to come. Technology development needs to be accelerated and prioritized at the highest level of the European policy agenda. This is the essence of the European Strategic Energy Technology Plan (SET-Plan). The SET-Plan makes concrete proposals for action to establish an energy technology policy for Europe, with a new mind-set for planning and working together and to foster science for transforming energy technologies to achieve EU energy and climate change goals for 2020, and to contribute to the worldwide transition to a low carbon economy by 2050. This paper gives an overview of the SET-Plan initiative and highlights its latest developments. It emphasises the importance of information in support of decision-making for investing in the development of low carbon technologies and shows the first results of the technology mapping undertaken by the newly established Information System of the SET-Plan (SETIS).(author)

  4. A Measure of Team Resilience: Developing the Resilience at Work Team Scale.

    Science.gov (United States)

    McEwen, Kathryn; Boyd, Carolyn M

    2018-03-01

    This study develops, and initial evaluates, a new measure of team-based resilience for use in research and practice. We conducted preliminary analyses, based on a cross-sectional sample of 344 employees nested within 31 teams. Seven dimensions were identified through exploratory and confirmatory factor analyses. The measure had high reliability and significant discrimination to indicate the presence of a unique team-based aspect of resilience that contributed to higher work engagement and higher self-rated team performance, over and above the effects of individual resilience. Multilevel analyses showed that team, but not individual, resilience predicted self-rated team performance. Practice implications include a need to focus on collective as well as individual behaviors in resilience-building. The measure provides a diagnostic instrument for teams and a scale to evaluate organizational interventions and research the relationship of resilience to other constructs.

  5. A Conceptual Framework for Team Social Capital as Basis for Organizational Team Synergy

    OpenAIRE

    Raluca ZOLTAN

    2012-01-01

    The purpose of this paper is to outline a conceptual framework of team social capital as a basis for reaching organizational team synergy. The dimensions of team social capital and the basic conditions required for organizational team synergy enable the extension of current model of team social capital by including of other variables. Today’s managers must consider these variables since the team tends to be the basic structural unit of current organizations and synergy, the key to achieving h...

  6. Decommissioning Plan for European Spallation Source

    Directory of Open Access Journals (Sweden)

    Ene Daniela

    2017-01-01

    Full Text Available This paper is a survey of the European Spallation Source initial decommissioning plan developed in compliance with Swedish Regulatory Authority requirements. The report outlines the decommissioning strategy selected and the baseline plan for decommissioning. Types and quantities of radioactive waste estimated to be generated at the final shut-down of the facility are further provided. The paper ends up with the analysis of the key elements of the decommissioning plan and the recommendations to the ESS management team..

  7. An interdisciplinary team communication framework and its application to healthcare 'e-teams' systems design.

    Science.gov (United States)

    Kuziemsky, Craig E; Borycki, Elizabeth M; Purkis, Mary Ellen; Black, Fraser; Boyle, Michael; Cloutier-Fisher, Denise; Fox, Lee Ann; MacKenzie, Patricia; Syme, Ann; Tschanz, Coby; Wainwright, Wendy; Wong, Helen

    2009-09-15

    There are few studies that examine the processes that interdisciplinary teams engage in and how we can design health information systems (HIS) to support those team processes. This was an exploratory study with two purposes: (1) To develop a framework for interdisciplinary team communication based on structures, processes and outcomes that were identified as having occurred during weekly team meetings. (2) To use the framework to guide 'e-teams' HIS design to support interdisciplinary team meeting communication. An ethnographic approach was used to collect data on two interdisciplinary teams. Qualitative content analysis was used to analyze the data according to structures, processes and outcomes. We present details for team meta-concepts of structures, processes and outcomes and the concepts and sub concepts within each meta-concept. We also provide an exploratory framework for interdisciplinary team communication and describe how the framework can guide HIS design to support 'e-teams'. The structures, processes and outcomes that describe interdisciplinary teams are complex and often occur in a non-linear fashion. Electronic data support, process facilitation and team video conferencing are three HIS tools that can enhance team function.

  8. An interdisciplinary team communication framework and its application to healthcare 'e-teams' systems design

    Directory of Open Access Journals (Sweden)

    MacKenzie Patricia

    2009-09-01

    Full Text Available Abstract Background There are few studies that examine the processes that interdisciplinary teams engage in and how we can design health information systems (HIS to support those team processes. This was an exploratory study with two purposes: (1 To develop a framework for interdisciplinary team communication based on structures, processes and outcomes that were identified as having occurred during weekly team meetings. (2 To use the framework to guide 'e-teams' HIS design to support interdisciplinary team meeting communication. Methods An ethnographic approach was used to collect data on two interdisciplinary teams. Qualitative content analysis was used to analyze the data according to structures, processes and outcomes. Results We present details for team meta-concepts of structures, processes and outcomes and the concepts and sub concepts within each meta-concept. We also provide an exploratory framework for interdisciplinary team communication and describe how the framework can guide HIS design to support 'e-teams'. Conclusion The structures, processes and outcomes that describe interdisciplinary teams are complex and often occur in a non-linear fashion. Electronic data support, process facilitation and team video conferencing are three HIS tools that can enhance team function.

  9. Spent nuclear fuel project high-level information management plan

    Energy Technology Data Exchange (ETDEWEB)

    Main, G.C.

    1996-09-13

    This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge of developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements

  10. Travelling with football teams

    African Journals Online (AJOL)

    ultimately on the performance of the teams on the playing field and not so much ... However, travelling with a football team presents the team physician .... physician to determine the nutritional ..... diarrhoea in elite athletes: an audit of one team.

  11. Developing Your Dream Team

    Science.gov (United States)

    Gatlin, Kenda

    2005-01-01

    Almost anyone has held various roles on a team, be it a family unit, sports team, or a project-oriented team. As an educator, one must make a conscious decision to build and invest in a team. Gathering the best team possible will help one achieve one's goals. This article explores some of the key reasons why it is important to focus on the team…

  12. The impact of service quality and sport-team identification on the repurchase intention

    Directory of Open Access Journals (Sweden)

    Branimir Oman

    2016-06-01

    Full Text Available During the last few decades, the role of the service sector in the overall economic activities has become more significant in many countries, particularly the most developed ones. This has provoked increased scholars' interest so they have begun researching many service markets more extensively. Their interest has been further stimulated by growing competition, development of new technologies and changes in consumer behaviour. These market changes have forced sport clubs' management to focus on providing higher service quality and strengthening team identification among consumers. The research presented in this paper was conducted on the fans of the Croatian football club Hajduk Split and it examines the relationship between service quality and team identification on the one hand and service quality and repurchase intention on the other as well as the intermediary role of word-of-mouth communication in the relationship between service quality and repurchase intentions. The results show that there is an indirect positive influence of service quality on repurchase intention through word-of-mouth communication, as well as a direct positive link between team identification and repurchase intention.

  13. Tiger Team Assessment of the Fermi National Accelerator Laboratory

    International Nuclear Information System (INIS)

    1992-06-01

    This draft report documents the Tiger Team Assessment of the Fermi National Accelerator Laboratory (Fermilab) located in Batavia, Illinois. Fermilab is a program-dedicated national laboratory managed by the Universities Research Association, Inc. (URA) for the US Department of Energy (DOE). The Tiger Team Assessment was conducted from May 11 to June 8, 1992, under the auspices of DOE's Office of Special Projects (OSP) under the Office of the Assistant Secretary for Environment, Safety and Health (EH). The assessment was comprehensive, encompassing environmental, safety and health (ES ampersand H), and quality assurance (QA) disciplines; site remediation; facilities management; and waste management operations. Compliance with applicable Federal , State of Illinois, and local regulations; applicable DOE Orders; best management practices; and internal Fermilab requirements was addressed. In addition, an evaluation of the effectiveness of DOE and Fermilab management of the ES ampersand H/QA and self-assessment programs was conducted. The Fermilab Tiger Team Assessment is part a larger, comprehensive DOE Tiger Team Independent Assessment Program planned for DOE facilities. The objective of the initiative is to provide the Secretary of Energy with information on the compliance status of DOE facilities with regard to ES ampersand H requirements, root causes for noncompliance, adequacy of DOE and contractor ES ampersand H management programs, response actions to address the identified problem areas, and DOE-wide ES ampersand H compliance trends and root causes

  14. A Conceptual Framework for Team Social Capital as Basis for Organizational Team Synergy

    Directory of Open Access Journals (Sweden)

    Raluca ZOLTAN

    2012-08-01

    Full Text Available The purpose of this paper is to outline a conceptual framework of team social capital as a basis for reaching organizational team synergy. The dimensions of team social capital and the basic conditions required for organizational team synergy enable the extension of current model of team social capital by including of other variables. Today’s managers must consider these variables since the team tends to be the basic structural unit of current organizations and synergy, the key to achieving high performance in global competition.

  15. Building the team for team science

    Science.gov (United States)

    Read, Emily K.; O'Rourke, M.; Hong, G. S.; Hanson, P. C.; Winslow, Luke A.; Crowley, S.; Brewer, C. A.; Weathers, K. C.

    2016-01-01

    The ability to effectively exchange information and develop trusting, collaborative relationships across disciplinary boundaries is essential for 21st century scientists charged with solving complex and large-scale societal and environmental challenges, yet these communication skills are rarely taught. Here, we describe an adaptable training program designed to increase the capacity of scientists to engage in information exchange and relationship development in team science settings. A pilot of the program, developed by a leader in ecological network science, the Global Lake Ecological Observatory Network (GLEON), indicates that the training program resulted in improvement in early career scientists’ confidence in team-based network science collaborations within and outside of the program. Fellows in the program navigated human-network challenges, expanded communication skills, and improved their ability to build professional relationships, all in the context of producing collaborative scientific outcomes. Here, we describe the rationale for key communication training elements and provide evidence that such training is effective in building essential team science skills.

  16. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  17. [Students' perceptions of team-based learning by individual characteristics in a medical school].

    Science.gov (United States)

    Park, Kwi Hwa; Choi, Chang-Hyu; Jeon, Yang-Bin; Park, Kook-Yang; Park, Chul-Hyun

    2013-06-01

    The purpose of this study was to examine medical students' perceptions of team-based learning (TBL) according to their individual characteristics: gender, team efficacy, interpersonal understanding, proactivity in problem solving, and academic ability. Thirty-eight second-year medical students who took an integrated cardiology course participated in this study; 28 were male and 10 were female. A questionnaire on individual characteristics and a questionnaire on the perception of TBL were administered, and the scores of individual characteristics were grouped into three: high, middle, and low. The data were analyzed by t-test, analysis of variance, and multiple regression analysis. The TBL efficacy perception scale consisted of 3 factors: team skill, learning ability, and team learning. The group of male students and the group of students with high academic ability recognized the effect of TBL on improvements in learning ability more than females and those with low academic ability. The group of students with high team efficacy reported that TBL was effective with regard to team skill improvement. The group of students with high scores on interpersonal understanding and high proactive problem solving tended to perceive the TBL's effect on team skill improvement. Team efficacy and proactivity in problem solving had a positive effect on the perception of TBL. Medical students' perceptions of the effectiveness of TBL differ according to individual characteristics. The results of this study suggest that these individual characteristics should be considered in planning of team learning, such as TBL, to have a positive impact and stronger effects.

  18. Future Time Perspective in Occupational Teams: Do Older Workers Prefer More Familiar Teams?

    Directory of Open Access Journals (Sweden)

    Laura U. A. Gärtner

    2017-09-01

    Full Text Available Working in teams is quite popular across different industries and cultures. While some of these teams exist for longer time periods, other teams collaborate only for short periods and members switch into new teams after goals are accomplished. However, workers’ preferences for joining a new team might vary in different ways. Based on Carstensen’s socioemotional selectivity theory, we predict that emotionally meaningful teams are prioritized when occupational future time perspective (OFTP is perceived as limited. Building and expanding on studies outside of the work context, we expected that older as compared to younger workers prefer more familiar teams, and that this effect is mediated by workers’ OFTP. Moreover, we assumed that experimentally manipulated OFTP can change such team preferences. The hypotheses were tested in an online scenario study using three experimental conditions (within-person design. Four hundred and fifty-four workers (57% female, age M = 45.98, SD = 11.46 were asked to choose between a familiar and a new team in three consecutive trials: under an unspecified OFTP (baseline, under an expanded OFTP (amendment of retirement age, and under a restricted OFTP (insolvency of the current company. Whereas the baseline condition was always first, the order of the second and third conditions was randomized among participants. In the baseline condition, results showed the expected mediation effect of workers’ OFTP on the relation between workers’ age and preference for a familiar over a new team. Higher age was associated with more limited OFTP, which in turn was associated with higher preference for a familiar over a new team. Moreover, experimentally restricting OFTP increased preference for a familiar team over a new team regardless of workers’ age, providing further evidence for the assumed causal processes and showing interesting avenues for practical interventions in occupational teams.

  19. Future Time Perspective in Occupational Teams: Do Older Workers Prefer More Familiar Teams?

    Science.gov (United States)

    Gärtner, Laura U. A.; Hertel, Guido

    2017-01-01

    Working in teams is quite popular across different industries and cultures. While some of these teams exist for longer time periods, other teams collaborate only for short periods and members switch into new teams after goals are accomplished. However, workers’ preferences for joining a new team might vary in different ways. Based on Carstensen’s socioemotional selectivity theory, we predict that emotionally meaningful teams are prioritized when occupational future time perspective (OFTP) is perceived as limited. Building and expanding on studies outside of the work context, we expected that older as compared to younger workers prefer more familiar teams, and that this effect is mediated by workers’ OFTP. Moreover, we assumed that experimentally manipulated OFTP can change such team preferences. The hypotheses were tested in an online scenario study using three experimental conditions (within-person design). Four hundred and fifty-four workers (57% female, age M = 45.98, SD = 11.46) were asked to choose between a familiar and a new team in three consecutive trials: under an unspecified OFTP (baseline), under an expanded OFTP (amendment of retirement age), and under a restricted OFTP (insolvency of the current company). Whereas the baseline condition was always first, the order of the second and third conditions was randomized among participants. In the baseline condition, results showed the expected mediation effect of workers’ OFTP on the relation between workers’ age and preference for a familiar over a new team. Higher age was associated with more limited OFTP, which in turn was associated with higher preference for a familiar over a new team. Moreover, experimentally restricting OFTP increased preference for a familiar team over a new team regardless of workers’ age, providing further evidence for the assumed causal processes and showing interesting avenues for practical interventions in occupational teams. PMID:29018376

  20. Future Time Perspective in Occupational Teams: Do Older Workers Prefer More Familiar Teams?

    Science.gov (United States)

    Gärtner, Laura U A; Hertel, Guido

    2017-01-01

    Working in teams is quite popular across different industries and cultures. While some of these teams exist for longer time periods, other teams collaborate only for short periods and members switch into new teams after goals are accomplished. However, workers' preferences for joining a new team might vary in different ways. Based on Carstensen's socioemotional selectivity theory, we predict that emotionally meaningful teams are prioritized when occupational future time perspective (OFTP) is perceived as limited. Building and expanding on studies outside of the work context, we expected that older as compared to younger workers prefer more familiar teams, and that this effect is mediated by workers' OFTP. Moreover, we assumed that experimentally manipulated OFTP can change such team preferences. The hypotheses were tested in an online scenario study using three experimental conditions (within-person design). Four hundred and fifty-four workers (57% female, age M = 45.98, SD = 11.46) were asked to choose between a familiar and a new team in three consecutive trials: under an unspecified OFTP (baseline), under an expanded OFTP (amendment of retirement age), and under a restricted OFTP (insolvency of the current company). Whereas the baseline condition was always first, the order of the second and third conditions was randomized among participants. In the baseline condition, results showed the expected mediation effect of workers' OFTP on the relation between workers' age and preference for a familiar over a new team. Higher age was associated with more limited OFTP, which in turn was associated with higher preference for a familiar over a new team. Moreover, experimentally restricting OFTP increased preference for a familiar team over a new team regardless of workers' age, providing further evidence for the assumed causal processes and showing interesting avenues for practical interventions in occupational teams.

  1. The impact of athlete leaders on team members’ team outcome confidence: A test of mediation by team identification and collective efficacy

    OpenAIRE

    Fransen, Katrien; Coffee, Pete; Vanbeselaere, Norbert; Slater, Matthew; De Cuyper, Bert; Boen, Filip

    2014-01-01

    Research on the effect of athlete leadership on pre-cursors of team performance such as team confidence is sparse. To explore the underlying mechanisms of how athlete leaders impact their team’s confidence, an online survey was completed by 2,867 players and coaches from nine different team sports in Flanders (Belgium). We distinguished between two types of team confidence: collective efficacy, assessed by the CEQS subscales of Effort, Persistence, Preparation, and Unity; and team outcome con...

  2. British discretion in Dutch planning: establishing a comparative perspective for regional planning and local development in the Netherlands and the United Kingdom

    NARCIS (Netherlands)

    Janssen-Jansen, L.B.; Woltjer, J.

    2010-01-01

    Regional planning and development is continuing to take an important role in planning agendas throughout Europe. In the United Kingdom (UK), the planning system has been reformed during the last decades, marking a noticeable shift from a development-led towards a more plan-led system. In the

  3. Teams, tribes and patient safety: overcoming barriers to effective teamwork in healthcare.

    Science.gov (United States)

    Weller, Jennifer; Boyd, Matt; Cumin, David

    2014-03-01

    Modern healthcare is delivered by multidisciplinary, distributed healthcare teams who rely on effective teamwork and communication to ensure effective and safe patient care. However, we know that there is an unacceptable rate of unintended patient harm, and much of this is attributed to failures in communication between health professionals. The extensive literature on teams has identified shared mental models, mutual respect and trust and closed-loop communication as the underpinning conditions required for effective teams. However, a number of challenges exist in the healthcare environment. We explore these in a framework of educational, psychological and organisational challenges to the development of effective healthcare teams. Educational interventions can promote a better understanding of the principles of teamwork, help staff understand each other's roles and perspectives, and help develop specific communication strategies, but may not be sufficient on their own. Psychological barriers, such as professional silos and hierarchies, and organisational barriers such as geographically distributed teams, can increase the chance of communication failures with the potential for patient harm. We propose a seven-step plan to overcome the barriers to effective team communication that incorporates education, psychological and organisational strategies. Recent evidence suggests that improvement in teamwork in healthcare can lead to significant gains in patient safety, measured against efficiency of care, complication rate and mortality. Interventions to improve teamwork in healthcare may be the next major advance in patient outcomes.

  4. Complex Problem Solving in Teams: The Impact of Collective Orientation on Team Process Demands.

    Science.gov (United States)

    Hagemann, Vera; Kluge, Annette

    2017-01-01

    Complex problem solving is challenging and a high-level cognitive process for individuals. When analyzing complex problem solving in teams, an additional, new dimension has to be considered, as teamwork processes increase the requirements already put on individual team members. After introducing an idealized teamwork process model, that complex problem solving teams pass through, and integrating the relevant teamwork skills for interdependently working teams into the model and combining it with the four kinds of team processes (transition, action, interpersonal, and learning processes), the paper demonstrates the importance of fulfilling team process demands for successful complex problem solving within teams. Therefore, results from a controlled team study within complex situations are presented. The study focused on factors that influence action processes, like coordination, such as emergent states like collective orientation, cohesion, and trust and that dynamically enable effective teamwork in complex situations. Before conducting the experiments, participants were divided by median split into two-person teams with either high ( n = 58) or low ( n = 58) collective orientation values. The study was conducted with the microworld C3Fire, simulating dynamic decision making, and acting in complex situations within a teamwork context. The microworld includes interdependent tasks such as extinguishing forest fires or protecting houses. Two firefighting scenarios had been developed, which takes a maximum of 15 min each. All teams worked on these two scenarios. Coordination within the team and the resulting team performance were calculated based on a log-file analysis. The results show that no relationships between trust and action processes and team performance exist. Likewise, no relationships were found for cohesion. Only collective orientation of team members positively influences team performance in complex environments mediated by action processes such as

  5. Yin and yang, or peas in a pod? Individual-sport versus team-sport athletes and altitude training.

    Science.gov (United States)

    Aughey, Robert J; Buchheit, Martin; Garvican-Lewis, Laura A; Roach, Gregory D; Sargent, Charli; Billaut, François; Varley, Matthew C; Bourdon, Pitre C; Gore, Christopher J

    2013-12-01

    The question of whether altitude training can enhance subsequent sea-level performance has been well investigated over many decades. However, research on this topic has focused on athletes from individual or endurance sports, with scant number of studies on team-sport athletes. Questions that need to be answered include whether this type of training may enhance team-sport athlete performance, when success in team-sport is often more based on technical and tactical ability rather than physical capacity per se. This review will contrast and compare athletes from two sports representative of endurance (cycling) and team-sports (soccer). Specifically, we draw on the respective competition schedules, physiological capacities, activity profiles and energetics of each sport to compare the similarities between athletes from these sports and discuss the relative merits of altitude training for these athletes. The application of conventional live-high, train-high; live-high, train-low; and intermittent hypoxic training for team-sport athletes in the context of the above will be presented. When the above points are considered, we will conclude that dependent on resources and training objectives, altitude training can be seen as an attractive proposition to enhance the physical performance of team-sport athletes without the need for an obvious increase in training load.

  6. Yin and yang, or peas in a pod? Individual-sport versus team-sport athletes and altitude training

    Science.gov (United States)

    Aughey, Robert J; Buchheit, Martin; Garvican-Lewis, Laura A; Roach, Gregory D; Sargent, Charli; Billaut, François; Varley, Matthew C; Bourdon, Pitre C; Gore, Christopher J

    2013-01-01

    The question of whether altitude training can enhance subsequent sea-level performance has been well investigated over many decades. However, research on this topic has focused on athletes from individual or endurance sports, with scant number of studies on team-sport athletes. Questions that need to be answered include whether this type of training may enhance team-sport athlete performance, when success in team-sport is often more based on technical and tactical ability rather than physical capacity per se. This review will contrast and compare athletes from two sports representative of endurance (cycling) and team-sports (soccer). Specifically, we draw on the respective competition schedules, physiological capacities, activity profiles and energetics of each sport to compare the similarities between athletes from these sports and discuss the relative merits of altitude training for these athletes. The application of conventional live-high, train-high; live-high, train-low; and intermittent hypoxic training for team-sport athletes in the context of the above will be presented. When the above points are considered, we will conclude that dependent on resources and training objectives, altitude training can be seen as an attractive proposition to enhance the physical performance of team-sport athletes without the need for an obvious increase in training load. PMID:24255910

  7. Business plan for a startup: Yen Viet Company

    OpenAIRE

    Truong, Hang

    2015-01-01

    The main objective of this thesis is to create a business plan for Yen Viet Company, to help the founder to discover whether the business idea is feasible or not. The business plan consists of these elements: executive summary, description of the company, business strategy and industry profile, description of the firm’s products and services, marketing strategy, description of the management team, financial plan, and financial plan. Exploratory analysis is chosen as the research method i...

  8. Leading team learning: what makes interprofessional teams learn to work well?

    Science.gov (United States)

    Chatalalsingh, Carole; Reeves, Scott

    2014-11-01

    This article describes an ethnographic study focused on exploring leaders of team learning in well-established nephrology teams in an academic healthcare organization in Canada. Employing situational theory of leadership, the article provides details on how well established team members advance as "learning leaders". Data were gathered by ethnographic methods over a 9-month period with the members of two nephrology teams. These learning to care for the sick teams involved over 30 regulated health professionals, such as physicians, nurses, social workers, pharmacists, dietitians and other healthcare practitioners, staff, students and trainees, all of whom were collectively managing obstacles and coordinating efforts. Analysis involved an inductive thematic analysis of observations, reflections, and interview transcripts. The study indicated how well established members progress as team-learning leaders, and how they adapt to an interprofessional culture through the activities they employ to enable day-to-day learning. The article uses situational theory of leadership to generate a detailed illumination of the nature of leaders' interactions within an interprofessional context.

  9. Student Management Teams Increase College Students' Feelings of Autonomy in the Classroom

    Science.gov (United States)

    Troisi, Jordan D.

    2015-01-01

    The use of Student Management Teams (SMTs) is a relatively new teaching technique designed to increase students' motivation and involvement with the planning and execution of college courses. However, to date, little systematic, empirical research has validated the effectiveness of using SMTs. To test the effectiveness of this technique, the…

  10. Political Science and Speech Communication--A Team Approach to Teaching Political Communication.

    Science.gov (United States)

    Blatt, Stephen J.; Fogel, Norman

    This paper proposes making speech communication more interdisciplinary and, in particular, combining political science and speech in a team-taught course in election campaigning. The goals, materials, activities, and plan of such a course are discussed. The goals include: (1) gaining new insights into the process of contemporary campaigns and…

  11. The Effects of Using the Transition Planning Inventory and a Structured IEP Process as a Transition Planning Intervention on IEP Meeting Outcomes

    Science.gov (United States)

    Rehfeldt, Jason D.; Clark, Gary M.; Lee, Steven W.

    2012-01-01

    This study examined two areas. First, the authors looked at whether secondary individualized education program (IEP) teams who used the "Transition Planning Inventory" (TPI) in conjunction with a structured IEP meeting that based discussions and decisions on TPI data as a planning intervention generated significantly more…

  12. British Columbia inland oil spill response plan

    International Nuclear Information System (INIS)

    2005-01-01

    This paper presents an outline of the organization, procedures and duties of the provincial government in response to inland oil spills stemming from pipeline or tank-farm rupture, train derailment and vehicle accidents in British Columbia. Provincial response strategies were reviewed, along with their relationships to various policies and standards. Public, infrastructure and environmental protection were identified as key factors. Incident notification procedures were detailed, including outlines of roles, event criteria and call for incident management teams. Agreements and cost recovery issues were examined. The characteristics of site response were reviewed, including details of communications, tactical planning, and unified command among local and federal governments. The role of First Nations and responsible parties was also addressed. Details of shore cleanup, wildlife rescue, decontamination, and waste handling strategies were presented. The organization, missions and duties for an incident management team were outlined, along with a summary of operational guidelines and information on team positions and the establishment of joint information centres. The involvement of cooperating agencies was examined. An incident command system was also presented, including details of planning, operations, logistics, and organization. A checklist of individual duties was provided, with details of responsibilities, safety issues and general instructions for all team members. tabs., figs

  13. Collocation Impact on Team Effectiveness

    Directory of Open Access Journals (Sweden)

    M Eccles

    2010-11-01

    Full Text Available The collocation of software development teams is common, specially in agile software development environments. However little is known about the impact of collocation on the team’s effectiveness. This paper explores the impact of collocating agile software development teams on a number of team effectiveness factors. The study focused on South African software development teams and gathered data through the use of questionnaires and interviews. The key finding was that collocation has a positive impact on a number of team effectiveness factors which can be categorised under team composition, team support, team management and structure and team communication. Some of the negative impact collocation had on team effectiveness relate to the fact that team members perceived that less emphasis was placed on roles, that morale of the group was influenced by individuals, and that collocation was invasive, reduced level of privacy and increased frequency of interruptions. Overall through it is proposed that companies should consider collocating their agile software development teams, as collocation might leverage overall team effectiveness.

  14. Influenza pandemic planning guide

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-11-15

    An influenza pandemic will have serious economic impacts on the natural gas industry due to absenteeism as well as downstream effects due to supply disruption.This guide was prepared to assist gas distribution companies in planning for an influenza epidemic. The guide aimed to minimize the risks that an influenza pandemic might pose to the health and safety of employees and the continuity of business operations. The guide discussed 5 critical aspects of emergency planning: (1) prevention and threat mitigation; (2) preparedness; (3) response; (4) business continuity; and (5) communication. The legal context of the emergency plans were discussed. The plans were also discussed to other essential infrastructure emergency response plans. Recommendations were presented for infection control, decentralization and access restriction. Outlines for pandemic response planning teams and training and exercise programs were provided. Issues related to alert, mobilization, and response procedures were also discussed. 10 refs., 3 tabs., 1 fig.

  15. Exploring effectiveness of team communication: Balancing synchronous and asynchronous communication in design teams

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Emmitt, S.

    2007-01-01

    Purpose – Effective teams use a balance of synchronous and asynchronous communication. Team communication is dependent on the communication acts of team members and the ability of managers to facilitate, stimulate and motivate them. Team members from organizations using different information systems

  16. Managing Geographically Dispersed Teams: From Temporary to Permanent Global Virtual Teams

    DEFF Research Database (Denmark)

    Svane Hansen, Tine; Hope, Alexander John; Moehler, Robert C.

    2012-01-01

    for organisations to move towards establishing permanent Global Virtual Teams in order to leverage knowledge sharing and cooperation across distance. To close this gap, this paper will set the scene for a research project investigating the changed preconditions for organisations. As daily face-to-face communication......The rise and spread of information communication technologies (ICT) has enabled increasing use of geographically dispersed work teams (Global Virtual Teams). Originally, Global Virtual Teams were mainly organised into temporary projects. Little research has focused on the emergent challenge...... generation of self-lead digital natives, who are already practising virtual relationships and a new approach to work, and currently joining the global workforce; and improved communication technologies. Keywords: Global Virtual teams, ICT, leadership, motivation, self-management, millenials....

  17. How Team-Level and Individual-Level Conflict Influences Team Commitment: A Multilevel Investigation

    Science.gov (United States)

    Lee, Sanghyun; Kwon, Seungwoo; Shin, Shung J.; Kim, MinSoo; Park, In-Jo

    2018-01-01

    We investigate how two different types of conflict (task conflict and relationship conflict) at two different levels (individual-level and team-level) influence individual team commitment. The analysis was conducted using data we collected from 193 employees in 31 branch offices of a Korean commercial bank. The relationships at multiple levels were tested using hierarchical linear modeling (HLM). The results showed that individual-level relationship conflict was negatively related to team commitment while individual-level task conflict was not. In addition, both team-level task and relationship conflict were negatively associated with team commitment. Finally, only team-level relationship conflict significantly moderated the relationship between individual-level relationship conflict and team commitment. We further derive theoretical implications of these findings. PMID:29387033

  18. How Team-Level and Individual-Level Conflict Influences Team Commitment: A Multilevel Investigation

    Directory of Open Access Journals (Sweden)

    Sanghyun Lee

    2018-01-01

    Full Text Available We investigate how two different types of conflict (task conflict and relationship conflict at two different levels (individual-level and team-level influence individual team commitment. The analysis was conducted using data we collected from 193 employees in 31 branch offices of a Korean commercial bank. The relationships at multiple levels were tested using hierarchical linear modeling (HLM. The results showed that individual-level relationship conflict was negatively related to team commitment while individual-level task conflict was not. In addition, both team-level task and relationship conflict were negatively associated with team commitment. Finally, only team-level relationship conflict significantly moderated the relationship between individual-level relationship conflict and team commitment. We further derive theoretical implications of these findings.

  19. The Impact of Environmental Complexity and Team Training on Team Processes and Performance in Multi-Team Environments

    National Research Council Canada - National Science Library

    Cobb, Marshall

    1999-01-01

    This study examined how manipulating the level of environmental complexity and the type of team training given to subject volunteers impacted important team process behaviors and performance outcomes...

  20. 76 FR 42683 - Establishment of a Team Under the National Construction Safety Team Act

    Science.gov (United States)

    2011-07-19

    ...-01] Establishment of a Team Under the National Construction Safety Team Act AGENCY: National..., announces the establishment of a National Construction Safety Team pursuant to the National Construction Safety Team Act. The Team was established to study the effects of the tornado that touched down in Joplin...

  1. Strength in unity: the power of redesign to align the hospital team.

    Science.gov (United States)

    Bell, Anthony; Cochrane, Alastair; Courtice, Sally; Flanigan, Kathy; Mathur, Mandeep; Wilckens, Daniel

    2014-06-01

    The aim of Queen Elizabeth II Jubilee Hospital (QEII) redesign project (QEII United) was to enhance timely access to an inpatient bed and maximise opportunities to value add during the inpatient episode of care. A tripartite relationship between the hospital team, system manager and external consultants. The team, QEII United, was formed to 'diagnose, solve and implement' change under the unifying metaphorical banner of a football team. A marketing strategy and communication plan targeted the key 'players' and outlined the 'game plan'. Baseline data were collected, analysed and reported in keeping with key aims. Strategies for systems improvement implementation were attached to key performance indicators (KPIs). Thematic KPIs were developed to embed internal process change to reflect the contributions made towards the National Emergency Access Target (NEAT) at each stage of the patient journey. As such, access block of under 20%, morning discharge rates of 50% before midday, reduced length of stay for selected elective orthopaedic and general medical diagnostic related groupings (DRGs; i.e. relative stay index ≤1) and hospital in the home (HITH) utilisation rates 1.5% of all admissions were all met. Key to sustainability was the transfer of clinical redesign skills to hospital staff and the fostering of emergent ground up leadership. QEII United's success has been underpinned by the development of themed solution areas developed by the hospital staff themselves. Robust baseline data analysis used in combination with nationally available benchmarking data provided a quantitative starting point for the work. The collaborative elements of the program re-energised the hospital team, who were kept informed by targeted communications, to establish quick wins and build trust and momentum for the more challenging areas.

  2. Netball team members, but not hobby group members, distinguish team characteristics from group characteristics.

    Science.gov (United States)

    Stillman, Jennifer A; Fletcher, Richard B; Carr, Stuart C

    2007-04-01

    Research on groups is often applied to sport teams, and research on teams is often applied to groups. This study investigates the extent to which individuals have distinct schemas for groups and teams. A list of team and group characteristics was generated from 250 individuals, for use in this and related research. Questions about teams versus groups carry an a priori implication that differences exist; therefore, list items were presented to new participants and were analyzed using signal detection theory, which can accommodate a finding of no detectable difference between a nominated category and similar items. Participants were 30 members from each of the following: netball teams, the general public, and hobby groups. Analysis revealed few features that set groups apart from teams; however, teams were perceived as more structured and demanding, requiring commitment and effort toward shared goals. Team and group characteristics were more clearly defined to team members than they were to other participant groups. The research has implications for coaches and practitioners.

  3. Leading multiple teams: average and relative external leadership influences on team empowerment and effectiveness.

    Science.gov (United States)

    Luciano, Margaret M; Mathieu, John E; Ruddy, Thomas M

    2014-03-01

    External leaders continue to be an important source of influence even when teams are empowered, but it is not always clear how they do so. Extending research on structurally empowered teams, we recognize that teams' external leaders are often responsible for multiple teams. We adopt a multilevel approach to model external leader influences at both the team level and the external leader level of analysis. In doing so, we distinguish the influence of general external leader behaviors (i.e., average external leadership) from those that are directed differently toward the teams that they lead (i.e., relative external leadership). Analysis of data collected from 451 individuals, in 101 teams, reporting to 25 external leaders, revealed that both relative and average external leadership related positively to team empowerment. In turn, team empowerment related positively to team performance and member job satisfaction. However, while the indirect effects were all positive, we found that relative external leadership was not directly related to team performance, and average external leadership evidenced a significant negative direct influence. Additionally, relative external leadership exhibited a significant direct positive influence on member job satisfaction as anticipated, whereas average external leadership did not. These findings attest to the value in distinguishing external leaders' behaviors that are exhibited consistently versus differentially across empowered teams. Implications and future directions for the study and management of external leaders overseeing multiple teams are discussed.

  4. Staff Turnover in Assertive Community Treatment (Act) Teams: The Role of Team Climate.

    Science.gov (United States)

    Zhu, Xi; Wholey, Douglas R; Cain, Cindy; Natafgi, Nabil

    2017-03-01

    Staff turnover in Assertive Community Treatment (ACT) teams can result in interrupted services and diminished support for clients. This paper examines the effect of team climate, defined as team members' shared perceptions of their work environment, on turnover and individual outcomes that mediate the climate-turnover relationship. We focus on two climate dimensions: safety and quality climate and constructive conflict climate. Using survey data collected from 26 ACT teams, our analyses highlight the importance of safety and quality climate in reducing turnover, and job satisfaction as the main mediator linking team climate to turnover. The findings offer practical implications for team management.

  5. Maximizing value for planned maintenance and turnarounds

    Energy Technology Data Exchange (ETDEWEB)

    Crager, John [Asset Performance Canada, ULC (Canada)

    2011-07-01

    In this presentation, Asset Performance Canada elaborates on turnaround management, and provides insight into managing strategies and risks associated with turnaround processes. Value is created fast as turnarounds progress from the strategy and scope definition phases towards the planning and execution phases. Turnarounds employ best practice solutions through common processes proven effective by data, research, and experience, ensuring consistent value creation, performance tracking, and shared lesson-learning. Adherence to the turnaround work process by carefully selected planning team members with clearly defined responsibilities and expectations, as well as an effective process for scope collection and management, are crucial to turnaround success. Further to this, a formal risk management process, employing automated risk tracking software and a safety management plan for assessing risks and their severity is also invaluable in avoiding any additional costs and schedule delays. Finally, assessment of team readiness and alignment through use of the turnaround readiness index, and rapid management of discovery work, can aid in contingency management.

  6. Strategic Planning Is an Oxymoron

    Science.gov (United States)

    Bassett, Patrick F.

    2012-01-01

    The thinking on "strategic thinking" has evolved significantly over the years. In the previous century, the independent school strategy was to focus on long-range planning, blithely projecting 10 years into the future. For decades this worked well enough, but in the late 20th century, independent schools shifted to "strategic planning," with its…

  7. Effective Hull IMMR plan

    Energy Technology Data Exchange (ETDEWEB)

    Franco, Mireille

    2010-07-01

    The objective of the Hull Inspection, Maintenance and Repair Plan is to ensure the total integrity of the Floating Production Unit. To be efficient, the Monitoring has to be part of the Hull Inspection, Monitoring, Maintenance and Repair Plan (IMMR). The IMMR Plan should be developed during the design and project phases and take into account the interfaces between the different systems and teams' tasks in operation. The IMMR is multidisciplinary and form part of the hand-over to ensure an efficient and early implementation. Implementation of such a complex plan requires: - Cross-functionality: take advantage of the synergies - Boldness: break the mould and think outside the box - Listening: be attentive, be available, - Mutual support: during good and bad times. This paper presents the way Total believe the Hull IMMR Plan shall be developed, implemented and followed up. (Author)

  8. The Role of the Pulmonary Embolism Response Team: How to Build One, Who to Include, Scenarios, Organization, and Algorithms.

    Science.gov (United States)

    Galmer, Andrew; Weinberg, Ido; Giri, Jay; Jaff, Michael; Weinberg, Mitchell

    2017-09-01

    Pulmonary embolism response teams (PERTs) are multidisciplinary response teams aimed at delivering a range of diagnostic and therapeutic modalities to patients with pulmonary embolism. These teams have gained traction on a national scale. However, despite sharing a common goal, individual PERT programs are quite individualized-varying in their methods of operation, team structures, and practice patterns. The tendency of such response teams is to become intensely structured, algorithmic, and inflexible. However, in their current form, PERT programs are quite the opposite. They are being creatively customized to meet the needs of the individual institution based on available resources, skills, personnel, and institutional goals. After a review of the essential core elements needed to create and operate a PERT team in any form, this article will discuss the more flexible feature development of the nascent PERT team. These include team planning, member composition, operational structure, benchmarking, market analysis, and rudimentary financial operations. Copyright © 2017 Elsevier Inc. All rights reserved.

  9. Clinical trials recruitment planning: A proposed framework from the Clinical Trials Transformation Initiative.

    Science.gov (United States)

    Huang, Grant D; Bull, Jonca; Johnston McKee, Kelly; Mahon, Elizabeth; Harper, Beth; Roberts, Jamie N

    2018-03-01

    Patient recruitment is widely recognized as a key determinant of success for clinical trials. Yet a substantial number of trials fail to reach recruitment goals-a situation that has important scientific, financial, ethical, and policy implications. Further, there are important effects on stakeholders who directly contribute to the trial including investigators, sponsors, and study participants. Despite efforts over multiple decades to identify and address barriers, recruitment challenges persist. To advance a more comprehensive approach to trial recruitment, the Clinical Trials Transformation Initiative (CTTI) convened a project team to examine the challenges and to issue actionable, evidence-based recommendations for improving recruitment planning that extend beyond common study-specific strategies. We describe our multi-stakeholder effort to develop a framework that delineates three areas essential to strategic recruitment planning efforts: (1) trial design and protocol development, (2) trial feasibility and site selection, and (3) communication. Our recommendations propose an upstream approach to recruitment planning that has the potential to produce greater impact and reduce downstream barriers. Additionally, we offer tools to help facilitate adoption of the recommendations. We hope that our framework and recommendations will serve as a guide for initial efforts in clinical trial recruitment planning irrespective of disease or intervention focus, provide a common basis for discussions in this area and generate targets for further analysis and continual improvement. Copyright © 2018 The Authors. Published by Elsevier Inc. All rights reserved.

  10. Complex Problem Solving in Teams: The Impact of Collective Orientation on Team Process Demands

    Science.gov (United States)

    Hagemann, Vera; Kluge, Annette

    2017-01-01

    Complex problem solving is challenging and a high-level cognitive process for individuals. When analyzing complex problem solving in teams, an additional, new dimension has to be considered, as teamwork processes increase the requirements already put on individual team members. After introducing an idealized teamwork process model, that complex problem solving teams pass through, and integrating the relevant teamwork skills for interdependently working teams into the model and combining it with the four kinds of team processes (transition, action, interpersonal, and learning processes), the paper demonstrates the importance of fulfilling team process demands for successful complex problem solving within teams. Therefore, results from a controlled team study within complex situations are presented. The study focused on factors that influence action processes, like coordination, such as emergent states like collective orientation, cohesion, and trust and that dynamically enable effective teamwork in complex situations. Before conducting the experiments, participants were divided by median split into two-person teams with either high (n = 58) or low (n = 58) collective orientation values. The study was conducted with the microworld C3Fire, simulating dynamic decision making, and acting in complex situations within a teamwork context. The microworld includes interdependent tasks such as extinguishing forest fires or protecting houses. Two firefighting scenarios had been developed, which takes a maximum of 15 min each. All teams worked on these two scenarios. Coordination within the team and the resulting team performance were calculated based on a log-file analysis. The results show that no relationships between trust and action processes and team performance exist. Likewise, no relationships were found for cohesion. Only collective orientation of team members positively influences team performance in complex environments mediated by action processes such as

  11. Complex Problem Solving in Teams: The Impact of Collective Orientation on Team Process Demands

    Directory of Open Access Journals (Sweden)

    Vera Hagemann

    2017-09-01

    Full Text Available Complex problem solving is challenging and a high-level cognitive process for individuals. When analyzing complex problem solving in teams, an additional, new dimension has to be considered, as teamwork processes increase the requirements already put on individual team members. After introducing an idealized teamwork process model, that complex problem solving teams pass through, and integrating the relevant teamwork skills for interdependently working teams into the model and combining it with the four kinds of team processes (transition, action, interpersonal, and learning processes, the paper demonstrates the importance of fulfilling team process demands for successful complex problem solving within teams. Therefore, results from a controlled team study within complex situations are presented. The study focused on factors that influence action processes, like coordination, such as emergent states like collective orientation, cohesion, and trust and that dynamically enable effective teamwork in complex situations. Before conducting the experiments, participants were divided by median split into two-person teams with either high (n = 58 or low (n = 58 collective orientation values. The study was conducted with the microworld C3Fire, simulating dynamic decision making, and acting in complex situations within a teamwork context. The microworld includes interdependent tasks such as extinguishing forest fires or protecting houses. Two firefighting scenarios had been developed, which takes a maximum of 15 min each. All teams worked on these two scenarios. Coordination within the team and the resulting team performance were calculated based on a log-file analysis. The results show that no relationships between trust and action processes and team performance exist. Likewise, no relationships were found for cohesion. Only collective orientation of team members positively influences team performance in complex environments mediated by action processes

  12. Conservation Action Planning: Lessons learned from the St. Marys River watershed biodiversity conservation planning process

    Science.gov (United States)

    Patterson, Tamatha A.; Grundel, Ralph

    2014-01-01

    Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.

  13. Team-based global organizations

    DEFF Research Database (Denmark)

    Zander, Lena; Butler, Christina; Mockaitis, Audra

    2015-01-01

    diversity in enhancing team creativity and performance, and 2) the sharing of knowledge in team-based organizations, while the other two themes address global team leadership: 3) the unprecedented significance of social capital for the success of global team leader roles; and 4) the link between shared......This chapter draws on a panel discussion of the future of global organizing as a team-based organization at EIBA 2014 in Uppsala, Sweden. We began by discussing contemporary developments of hybrid forms of hierarchy and teams-based organizing, but we venture to propose that as organizations become...... characterized by decreased importance of hierarchal structures, more fluidity across borders, even a possible dissolution of firm boundaries, we move towards team-based organizing as an alternative to more traditional forms of hierarchical-based organizing in global firms. To provide input for a discussion...

  14. System i Disaster Recovery Planning

    CERN Document Server

    Dolewski, Richard

    2008-01-01

    Mapping out all the preparations necessary for an effective disaster recovery plan and its safeguard-a continuous maintenance program-this guide is aimed at IT managers of small and medium businesses. The opening section covers the initial steps of auditing vulnerability, ranking essential IT functions, and reviewing the storage of tape backups, with the following discussion focused on the elements of the plan itself. The plan includes a mission statement, a definition of disaster, the assignment of staff to teams, methods of compensating for human error, and standards for documenting the step

  15. The Large UV/Optical/Infrared Surveyor (LUVOIR): Decadal Mission concept design update

    Science.gov (United States)

    Bolcar, Matthew R.; Aloezos, Steve; Bly, Vincent T.; Collins, Christine; Crooke, Julie; Dressing, Courtney D.; Fantano, Lou; Feinberg, Lee D.; France, Kevin; Gochar, Gene; Gong, Qian; Hylan, Jason E.; Jones, Andrew; Linares, Irving; Postman, Marc; Pueyo, Laurent; Roberge, Aki; Sacks, Lia; Tompkins, Steven; West, Garrett

    2017-09-01

    In preparation for the 2020 Astrophysics Decadal Survey, NASA has commissioned the study of four large mission concepts, including the Large Ultraviolet / Optical / Infrared (LUVOIR) Surveyor. The LUVOIR Science and Technology Definition Team (STDT) has identified a broad range of science objectives including the direct imaging and spectral characterization of habitable exoplanets around sun-like stars, the study of galaxy formation and evolution, the epoch of reionization, star and planet formation, and the remote sensing of Solar System bodies. NASA's Goddard Space Flight Center (GSFC) is providing the design and engineering support to develop executable and feasible mission concepts that are capable of the identified science objectives. We present an update on the first of two architectures being studied: a 15- meter-diameter segmented-aperture telescope with a suite of serviceable instruments operating over a range of wavelengths between 100 nm to 2.5 μm. Four instruments are being developed for this architecture: an optical / near-infrared coronagraph capable of 10-10 contrast at inner working angles as small as 2 λ/D the LUVOIR UV Multi-object Spectrograph (LUMOS), which will provide low- and medium-resolution UV (100 - 400 nm) multi-object imaging spectroscopy in addition to far-UV imaging; the High Definition Imager (HDI), a high-resolution wide-field-of-view NUV-Optical-IR imager; and a UV spectro-polarimeter being contributed by Centre National d'Etudes Spatiales (CNES). A fifth instrument, a multi-resolution optical-NIR spectrograph, is planned as part of a second architecture to be studied in late 2017.

  16. AMAT guidelines. Reference document for the IAEA Ageing Management Assessment Teams (AMATs)

    International Nuclear Information System (INIS)

    1999-01-01

    Effective ageing management is an important element for ensuring the safety of nuclear power plant. The IAEA Ageing Management Assessment Team (AMAT) programme provides advice and assistance to utilities or individual NPPs to strengthen and enhance the effectiveness of ageing management programs (AMPs). Such AMPs are required by an increasing number of safety utilities and implemented by an increasing number of utilities, often as a part of NPP life or life cycle management programs that involve the integration of ageing management and economic planning. The guidelines in this report are primarily intended for IAEA-led AMAT team members as a basic structure and common reference for peer reviews of AMPs

  17. Determining the need for team-based training in delirium management: A needs assessment of surgical healthcare professionals.

    Science.gov (United States)

    Sockalingam, Sanjeev; Tehrani, Hedieh; Kacikanis, Anna; Tan, Adrienne; Hawa, Raed; Anderson, Ruthie; Okrainec, Allan; Abbey, Susan

    2015-01-01

    The high incidence of delirium in surgical units is a serious quality concern, given its impact on morbidity and mortality. While successful delirium management depends upon interdisciplinary care, training needs for surgical teams have not been studied. A needs assessment of surgical units was conducted to determine perceived comfort in managing delirium, and interprofessional training needs for team-based care. We administered a survey to 106 General Surgery healthcare professionals (69% response rate) with a focus on attitudes towards delirium and team management. Although most respondents identified delirium as important to patient outcomes, only 61% of healthcare professionals indicated that a team-based approach was always observed in practice. Less than half had a clear understanding of their role in delirium care, while just over half observed team communication of delirium care plans during handover. This is the first observation of clear gaps in perceived team performance in a General Surgery setting.

  18. Team Creativity: The Effects of Perceived Learning Culture, Developmental Feedback and Team Cohesion

    Science.gov (United States)

    Joo, Baek-Kyoo; Song, Ji Hoon; Lim, Doo Hun; Yoon, Seung Won

    2012-01-01

    This study investigates the influence of perceived learning culture, developmental feedback and team cohesion on team creativity. The results showed that the demographic variables, the three antecedents and their interactions explained 41 per cent of variance in team creativity. Team creativity was positively correlated with a higher level of…

  19. Does adding a dietician to the liaison team after discharge of geriatric patients improve nutritional outcome

    DEFF Research Database (Denmark)

    Beck, Anne Marie; Tolstrup Andersen, Ulla; Leedo, Eva

    2015-01-01

    (70 + years and at nutritional risk) at discharge. INTERVENTIONS: Participants were randomly allocated to receive discharge Liaison-Team vs. discharge Liaison-Team in cooperation with a dietician. The dietician performed a total of three home visits with the aim of developing and implementing......OBJECTIVES: The objective was to test whether adding a dietician to a discharge Liaison-Team after discharge of geriatric patients improves nutritional status, muscle strength and patient relevant outcomes. DESIGN: Twelve-week randomized controlled trial. SETTING AND SUBJECTS: Geriatric patients...... an individual nutritional care plan. The first visit took place at the day of discharge together with the discharge Liaison-Team while the remaining visits took place approximately three and eight weeks after discharge and were performed by a dietician alone. MAIN MEASURES: Nutritional status (weight...

  20. The bigger they are, the harder they fall: linking team power, team conflict, and performance

    NARCIS (Netherlands)

    Greer, L.L.; Caruso, H.M.; Jehn, K.A.

    2011-01-01

    Across two field studies, we investigate the impact of team power on team conflict and performance. Team power is based on the control of resources that enables a team to influence others in the company. We find across both studies that low-power teams outperform high-power teams. In both studies,

  1. Stimulating teachers’ team performance through team-oriented HR practices

    NARCIS (Netherlands)

    Bouwmans, Machiel; Runhaar, Piety; Wesselink, Renate; Mulder, Martin

    2017-01-01

    Teams of teachers are increasingly held accountable for the quality of education and educational reforms in vocational education and training institutions. However, historically teachers have not been required to engage in deep-level collaboration, thus team-oriented HR practices are being used

  2. Ability Dispersion and Team Performance

    DEFF Research Database (Denmark)

    Hoogendoorn, Sander; Parker, Simon C.; Van Praag, Mirjam

    What is the effect of dispersed levels of cognitive ability of members of a (business) team on their team's performance? This paper reports the results of a field experiment in which 573 students in 49 (student) teams start up and manage real companies under identical circumstances for one year. We...... ensured exogenous variation in otherwise random team composition by assigning students to teams based on their measured cognitive abilities. Each team performs a variety of tasks, often involving complex decision making. The key result of the experiment is that the performance of business teams first...... increases and then decreases with ability dispersion. We seek to understand this finding by developing a model in which team members of different ability levels form sub- teams with other team members with similar ability levels to specialize in different productive tasks. Diversity spreads production over...

  3. Speeding Up Team Learning.

    Science.gov (United States)

    Edmondson, Amy; Bohmer, Richard; Pisano, Gary

    2001-01-01

    A study of 16 cardiac surgery teams looked at how the teams adapted to new ways of working. The challenge of team management is to implement new processes as quickly as possible. Steps for creating a learning team include selecting a mix of skills and expertise, framing the challenge, and creating an environment of psychological safety. (JOW)

  4. Are they ready? Organizational readiness for change among clinical teaching teams.

    Science.gov (United States)

    Bank, Lindsay; Jippes, Mariëlle; Leppink, Jimmie; Scherpbier, Albert Jja; den Rooyen, Corry; van Luijk, Scheltus J; Scheele, Fedde

    2017-01-01

    Curriculum change and innovation are inevitable parts of progress in postgraduate medical education (PGME). Although implementing change is known to be challenging, change management principles are rarely looked at for support. Change experts contend that organizational readiness for change (ORC) is a critical precursor for the successful implementation of change initiatives. Therefore, this study explores whether assessing ORC in clinical teaching teams could help to understand how curriculum change takes place in PGME. Clinical teaching teams in hospitals in the Netherlands were requested to complete the Specialty Training's Organizational Readiness for curriculum Change, a questionnaire to measure ORC in clinical teaching teams. In addition, change-related behavior was measured by using the "behavioral support-for-change" measure. A two-way analysis of variance was performed for all response variables of interest. In total, 836 clinical teaching team members were included in this study: 288 (34.4%) trainees, 307 (36.7%) clinical staff members, and 241 (28.8%) program directors. Overall, items regarding whether the program director has the authority to lead scored higher compared with the other items. At the other end, the subscales "management support and leadership," "project resources," and "implementation plan" had the lowest scores in all groups. The study brought to light that program directors are clearly in the lead when it comes to the implementation of educational innovation. Clinical teaching teams tend to work together as a team, sharing responsibilities in the implementation process. However, the results also reinforce the need for change management support in change processes in PGME.

  5. Diversity in goal orientation, team reflexivity, and team performance

    NARCIS (Netherlands)

    Pieterse, Anne Nederveen; van Knippenberg, Daan; van Ginkel, Wendy P.

    Although recent research highlights the role of team member goal orientation in team functioning, research has neglected the effects of diversity in goal orientation. In a laboratory study with groups working on a problem-solving task, we show that diversity in learning and performance orientation

  6. Ethnography of Language Planning and Policy

    Science.gov (United States)

    Hornberger, Nancy H.; Tapia, Aldo Anzures; Hanks, David H.; Dueñas, Frances Kvietok

    2018-01-01

    A decade ago, Hornberger & Johnson proposed that the ethnography of language planning and policy (ELPP) offers a useful way to understand how people create, interpret, and at times resist language policy and planning (LPP). They envisioned ethnographic investigation of layered LPP ideological and implementational spaces, taking up Hornberger's…

  7. Performance of student software development teams: the influence of personality and identifying as team members

    Science.gov (United States)

    Monaghan, Conal; Bizumic, Boris; Reynolds, Katherine; Smithson, Michael; Johns-Boast, Lynette; van Rooy, Dirk

    2015-01-01

    One prominent approach in the exploration of the variations in project team performance has been to study two components of the aggregate personalities of the team members: conscientiousness and agreeableness. A second line of research, known as self-categorisation theory, argues that identifying as team members and the team's performance norms should substantially influence the team's performance. This paper explores the influence of both these perspectives in university software engineering project teams. Eighty students worked to complete a piece of software in small project teams during 2007 or 2008. To reduce limitations in statistical analysis, Monte Carlo simulation techniques were employed to extrapolate from the results of the original sample to a larger simulated sample (2043 cases, within 319 teams). The results emphasise the importance of taking into account personality (particularly conscientiousness), and both team identification and the team's norm of performance, in order to cultivate higher levels of performance in student software engineering project teams.

  8. Efficacy of the “pick and roll” offense in top level European basketball teams

    Science.gov (United States)

    Marmarinos, Christos; Kostopoulos, Nikolaos; Apostolidis, Alexandros

    2016-01-01

    Abstract Team offense in basketball games consists of a set of offensive actions carried out with the cooperation of two or more players. Of these actions, the most commonly used in the last decade is the on-ball screen called the “pick and roll.” The aim of this study was to analyze all of the pick and rolls conducted in the Euroleague championship from all of the 24 participating teams and to investigate the possible relationships between success in the pick and roll and overall success of the teams. For this purpose, 12,376 pick and rolls from 502 matches were analyzed and classified in categories according to the end result of the offensive possession. The results showed that the most effective type of pick and roll offense was when a shot was attempted after 2 passes from the pick and roll occurrence, followed by the screener’s shot when he rolled to the basket. Additionally, linear regression analysis confirmed that pick and roll effectiveness could predict the final classification of the teams. Conclusively, coaches of the high level European clubs should focus on training the players to the most efficient phases of the pick and roll offense, so that the chances of winning the championship to be maximized. PMID:28149375

  9. Efficacy of the “pick and roll” offense in top level European basketball teams

    Directory of Open Access Journals (Sweden)

    Marmarinos Christos

    2016-06-01

    Full Text Available Team offense in basketball games consists of a set of offensive actions carried out with the cooperation of two or more players. Of these actions, the most commonly used in the last decade is the on-ball screen called the “pick and roll.” The aim of this study was to analyze all of the pick and rolls conducted in the Euroleague championship from all of the 24 participating teams and to investigate the possible relationships between success in the pick and roll and overall success of the teams. For this purpose, 12,376 pick and rolls from 502 matches were analyzed and classified in categories according to the end result of the offensive possession. The results showed that the most effective type of pick and roll offense was when a shot was attempted after 2 passes from the pick and roll occurrence, followed by the screener’s shot when he rolled to the basket. Additionally, linear regression analysis confirmed that pick and roll effectiveness could predict the final classification of the teams. Conclusively, coaches of the high level European clubs should focus on training the players to the most efficient phases of the pick and roll offense, so that the chances of winning the championship to be maximized.

  10. Tracking the Short Term Planning (STP) Development Process

    Science.gov (United States)

    Price, Melanie; Moore, Alexander

    2010-01-01

    Part of the National Aeronautics and Space Administration?s mission is to pioneer the future in space exploration, scientific discovery and aeronautics research is enhanced by discovering new scientific tools to improve life on earth. Sequentially, to successfully explore the unknown, there has to be a planning process that organizes certain events in the right priority. Therefore, the planning support team has to continually improve their processes so the ISS Mission Operations can operate smoothly and effectively. The planning support team consists of people in the Long Range Planning area that develop timelines that includes International Partner?s Preliminary STP inputs all the way through to publishing of the Final STP. Planning is a crucial part of the NASA community when it comes to planning the astronaut?s daily schedule in great detail. The STP Process is in need of improvement, because of the various tasks that are required to be broken down in order to get the overall objective of developing a Final STP done correctly. Then a new project came along in order to store various data in a more efficient database. "The SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas."

  11. Trauma teams and time to early management during in situ trauma team training.

    Science.gov (United States)

    Härgestam, Maria; Lindkvist, Marie; Jacobsson, Maritha; Brulin, Christine; Hultin, Magnus

    2016-01-29

    To investigate the association between the time taken to make a decision to go to surgery and gender, ethnicity, years in profession, experience of trauma team training, experience of structured trauma courses and trauma in the trauma team, as well as use of closed-loop communication and leadership styles during trauma team training. In situ trauma team training. The patient simulator was preprogrammed to represent a severely injured patient (injury severity score: 25) suffering from hypovolemia due to external trauma. An emergency room in an urban Scandinavian level one trauma centre. A total of 96 participants were divided into 16 trauma teams. Each team consisted of six team members: one surgeon/emergency physician (designated team leader), one anaesthesiologist, one registered nurse anaesthetist, one registered nurse from the emergency department, one enrolled nurse from the emergency department and one enrolled nurse from the operating theatre. HRs with CIs (95% CI) for the time taken to make a decision to go to surgery was computed from a Cox proportional hazards model. Three variables remained significant in the final model. Closed-loop communication initiated by the team leader increased the chance of a decision to go to surgery (HR: 3.88; CI 1.02 to 14.69). Only 8 of the 16 teams made the decision to go to surgery within the timeframe of the trauma team training. Conversely, call-outs and closed-loop communication initiated by the team members significantly decreased the chance of a decision to go to surgery, (HR: 0.82; CI 0.71 to 0.96, and HR: 0.23; CI 0.08 to 0.71, respectively). Closed-loop communication initiated by the leader appears to be beneficial for teamwork. In contrast, a high number of call-outs and closed-loop communication initiated by team members might lead to a communication overload. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  12. Exploring effectiveness of team communication: Balancing synchronous and asynchronous communication in design teams

    DEFF Research Database (Denmark)

    den Otter, Ad; Emmitt, Stephen

    2007-01-01

    Effective teams use a balance of synchronous and asynchronous communication. Team communication is dependent on the communication acts of team members and the ability of managers to facilitate, stimulate and motivate them. Team members from organizations using different information systems tend...... to have different understanding, opinions, and rates of adoption and skills levels regarding specific IT tools. The purpose of this paper is to explore the effective use of tools for communication in design teams and the strategies for the use of specific tools....

  13. Team structure and regulatory focus: the impact of regulatory fit on team dynamic.

    Science.gov (United States)

    Dimotakis, Nikolaos; Davison, Robert B; Hollenbeck, John R

    2012-03-01

    We report a within-teams experiment testing the effects of fit between team structure and regulatory task demands on task performance and satisfaction through average team member positive affect and helping behaviors. We used a completely crossed repeated-observations design in which 21 teams enacted 2 tasks with different regulatory focus characteristics (prevention and promotion) in 2 organizational structures (functional and divisional), resulting in 84 observations. Results suggested that salient regulatory demands inherent in the task interacted with structure to determine objective and subjective team-level outcomes, such that functional structures were best suited to (i.e., had best fit with) tasks with a prevention regulatory focus and divisional structures were best suited to tasks with a promotion regulatory focus. This contingency finding integrates regulatory focus and structural contingency theories, and extends them to the team level with implications for models of performance, satisfaction, and team dynamics.

  14. How to manage organisational change and create practice teams: experiences of a South African primary care health centre.

    Science.gov (United States)

    Mash, B J; Mayers, P; Conradie, H; Orayn, A; Kuiper, M; Marais, J

    2008-07-01

    In South Africa, first-contact primary care is delivered by nurses in small clinics and larger community health centres (CHC). CHCs also employ doctors, who often work in isolation from the nurses, with poor differentiation of roles and little effective teamwork or communication. Worcester CHC, a typical public sector CHC in rural South Africa, decided to explore how to create more successful practice teams of doctors and nurses. This paper is based on their experience of both unsuccessful and successful attempts to introduce practice teams and reports on their learning regarding organisational change. An emergent action research study design utilised a co-operative inquiry group. The first nine months of inquiry focused on understanding the initial unsuccessful attempt to create practice teams. This paper reports primarily on the subsequent nine months (four cycles of planning, action, observation and reflection) during which practice teams were re-introduced. The central question was how more effective practice teams of doctors and nurses could be created. The group utilised outcome mapping to assist with planning, monitoring and evaluation. Outcome mapping defined a vision, mission, boundary partners, outcome challenges, progress markers and strategies for the desired changes and supported quantitative monitoring of the process. Qualitative data were derived from the co-operative inquiry group (CIG) meetings and interviews with doctors, nurses, practice teams and patients. The CIG engaged effectively with 68% of the planned strategies, and more than 60% of the progress markers were achieved for clinical nurse practitioners, doctors, support staff and managers, but not for patients. Key themes that emerged from the inquiry group's reflection on their experience of the change process dealt with the amount of interaction, type of communication, team resilience, staff satisfaction, leadership style, reflective capacity, experimentation and evolution of new

  15. A Mid-IR Census of Dusty Supernovae From the Past Decade In Preparation for JWST

    Science.gov (United States)

    Fox, Ori; Andrews, Jennifer; Arendt, Rick; Clayton, Geoff; Dwek, Eli; Filippenko, Alex; Johansson, Joel; Kelly, Patrick; Krafton, Kelsie; Marston, Tony; Mauerhan, Jon; Szalai, Tamas; Van Dyk, Schuyler

    2018-05-01

    Over the past decade, our team has shown that a surprising number of different supernova (SN) subclasses have members that exhibit mid-infrared (mid-IR) emission from warm dust at late times (>100 days post-explosion). This work has used Spitzer 3.6 and 4.5 micron imaging to constrain the dust origin and heating mechanisms, but a number of questions still remain. How much dust can SNe IIP produce in their ejecta? What progenitor can produce such extreme mass-loss events required to form the large, dense, pre-existing dust shells observed in so many cases? Many of these SNe remain bright today, in some cases more than a decade after discovery. Continued mid-IR monitoring is necessary to answer these questions by measuring the full extent of either the newly formed dust mass or pre-existing dust shell. Furthermore, Spitzer observations of both old and new SNe will provide up to date flux estimates as we prepare for continued observations with JWST. This proposal will cap off nearly a decade of work and bridge the gap to the first few cycles of JWST.

  16. [Costs with personnel and productivity analysis of family health program teams in Fortaleza, Ceará].

    Science.gov (United States)

    Rocha Filho, Fernando dos Santos; da Silva, Marcelo Gurgel Carlos

    2009-01-01

    The research verified the productivity and the operational personnel costs of eight teams of the Family Health Program (PSF) of two Basic Units of Family Health (UBASF) in Fortaleza, Ceará, through the methodology of costs by absorption, in 2004. The largest expenses were with personnel (75%), mainly with the PSF teams, and medicines (18%). The federal allocations received in September, 2004, by each PSF team, were R$ 9,543.33. The total cost by team was R$ 15,719.00. Some professionals of various PSF teams showed productivity above the set objectives, but the average productivity by doctor and nurse was below fifty per cent of objectives, with high idle time making the work onerous. The unity cost of home visits by doctor and prenatal attendance by nurses were checked, and, would be less expensive if the idle time were reduced. Various alternatives of cost reduction were observed, such as scale savings of some resources and services and re-negotiation of contracts with suppliers and cooperatives. The data obtained will contribute to more accurate planning for the installation and maintenance of PSF teams as well as alternatives of cost reductions, higher productivity, and better quality.

  17. The interplay of diversity training and diversity beliefs on team creativity in nationality diverse teams.

    Science.gov (United States)

    Homan, Astrid C; Buengeler, Claudia; Eckhoff, Robert A; van Ginkel, Wendy P; Voelpel, Sven C

    2015-09-01

    Attaining value from nationality diversity requires active diversity management, which organizations often employ in the form of diversity training programs. Interestingly, however, the previously reported effects of diversity training are often weak and, sometimes, even negative. This situation calls for research on the conditions under which diversity training helps or harms teams. We propose that diversity training can increase team creativity, but only for teams with less positive pretraining diversity beliefs (i.e., teams with a greater need for such training) and that are sufficiently diverse in nationality. Comparing the creativity of teams that attended nationality diversity training versus control training, we found that for teams with less positive diversity beliefs, diversity training increased creative performance when the team's nationality diversity was high, but undermined creativity when the team's nationality diversity was low. Diversity training had less impact on teams with more positive diversity beliefs, and training effects were not contingent upon these teams' diversity. Speaking to the underlying process, we showed that these interactive effects were driven by the experienced team efficacy of the team members. We discuss theoretical and practical implications for nationality diversity management. (c) 2015 APA, all rights reserved).

  18. Gender Composition of Tactical Decision Making Teams; Impact on Team Process and Outcome

    National Research Council Canada - National Science Library

    Elliott, Linda

    1997-01-01

    This study investigates the performance of teams differing in gender composition on a university-developed synthetic task, the Team Interactive Decision Exercise for Teams Incorporating Distributed Expertise (TIDE2...

  19. Model of Team Organization and Behavior and Team Description Method

    Science.gov (United States)

    1984-10-01

    PERFORMING ORG& REPORT’ NUMBER 7.AUTHIOR(&) 0. CONTRACT OR GRANT NUMOSR(ej J. Thomas Roth Rohn J. Hritz HDA 903-81-C-0198: VEa Donald W. McGill 9...team descriptions are included, acid procedures for data recording are provided. 4q-4 4 iv, G OP S• . . • ,," $1 . . ’ __ _ _ _ ’ / . • , Utilization...Listing of thi! number acid identification of the roles adopted by team members in the actual team structure, along with KOS and primary equipment

  20. Case management: a randomized controlled study comparing a neighborhood team and a centralized individual model.

    Science.gov (United States)

    Eggert, G M; Zimmer, J G; Hall, W J; Friedman, B

    1991-10-01

    This randomized controlled study compared two types of case management for skilled nursing level patients living at home: the centralized individual model and the neighborhood team model. The team model differed from the individual model in that team case managers performed client assessments, care planning, some direct services, and reassessments; they also had much smaller caseloads and were assigned a specific catchment area. While patients in both groups incurred very high estimated health services costs, the average annual cost during 1983-85 for team cases was 13.6 percent less than that of individual model cases. While the team cases were 18.3 percent less expensive among "old" patients (patients who entered the study from the existing ACCESS caseload), they were only 2.7 percent less costly among "new" cases. The lower costs were due to reductions in hospital days and home care. Team cases averaged 26 percent fewer hospital days per year and 17 percent fewer home health aide hours. Nursing home use was 48 percent higher for the team group than for the individual model group. Mortality was almost exactly the same for both groups during the first year (about 30 percent), but was lower for team patients during the second year (11 percent as compared to 16 percent). Probable mechanisms for the observed results are discussed.

  1. Implementation of a team-based learning course: Work required and perceptions of the teaching team.

    Science.gov (United States)

    Morris, Jenny

    2016-11-01

    Team-based learning was selected as a strategy to help engage pre-registration undergraduate nursing students in a second-year evidence-informed decision making course. To detail the preparatory work required to deliver a team-based learning course; and to explore the perceptions of the teaching team of their first experience using team-based learning. Descriptive evaluation. Information was extracted from a checklist and process document developed by the course leader to document the work required prior to and during implementation. Members of the teaching team were interviewed by a research assistant at the end of the course using a structured interview schedule to explore perceptions of first time implementation. There were nine months between the time the decision was made to use team-based learning and the first day of the course. Approximately 60days were needed to reconfigure the course for team-based learning delivery, develop the knowledge and expertise of the teaching team, and develop and review the resources required for the students and the teaching team. This reduced to around 12days for the subsequent delivery. Interview data indicated that the teaching team were positive about team-based learning, felt prepared for the course delivery and did not identify any major problems during this first implementation. Implementation of team-based learning required time and effort to prepare the course materials and the teaching team. The teaching team felt well prepared, were positive about using team-based learning and did not identify any major difficulties. Crown Copyright © 2016. Published by Elsevier Ltd. All rights reserved.

  2. Your cancer care team

    Science.gov (United States)

    ... gov/ency/patientinstructions/000929.htm Your cancer care team To use the sharing features on this page, ... help your body heal. Working with Your Care Team Each member of your care team plays an ...

  3. The Cultural Challenges of Managing Global Project Teams: A Study of Brazilian Multinationals

    Directory of Open Access Journals (Sweden)

    Ivete Rodrigues

    2013-04-01

    Full Text Available The internationalization of Brazilian companies brings a new reality: the need for implementation of global projects that bring, in turn, the challenge of managing multicultural teams. Since this is a recent phenomenon with little theoretical development, this study sought to understand the relationships between cultural characteristics and management teams of global projects in Brazilian multinationals. To carry this discussion forward, we studied six cases of Brazilian multinational companies, with the aim of deepening the understanding of the management of global teams, involving the planning, deployment, development and management of human resources. Among the projects studied, it was found that there is very little concern with the specific issue of multiculturalism and little inter-cultural incentive to the development of team members, which ends up hindering the construction of a global mindset, important for the Brazilian multinational companies to perform successfully abroad. Faced with this situation, each of the managerial processes mentioned were presented with a number of actions to be undertaken by the project manager in three different dimensions: the project itself, the organization and the global environment. The work contributes, thus, to enable Brazilian multinational companies to manage their global teams in order to maximize the advantages of global teams, such as increased creativity and innovative capacity, but avoid the problems that multiculturalism can bring, ranging from conflicts between people to project failure.

  4. NASA Planning for Orion Multi-Purpose Crew Vehicle Ground Operations

    Science.gov (United States)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    The NASA Orion Ground Processing Team was originally formed by the Kennedy Space Center (KSC) Constellation (Cx) Project Office's Orion Division to define, refine and mature pre-launch and post-landing ground operations for the Orion human spacecraft. The multidisciplined KSC Orion team consisted of KSC civil servant, SAIC, Productivity Apex, Inc. and Boeing-CAPPS engineers, project managers and safety engineers, as well as engineers from Constellation's Orion Project and Lockheed Martin Orion Prime contractor. The team evaluated the Orion design configurations as the spacecraft concept matured between Systems Design Review (SDR), Systems Requirement Review (SRR) and Preliminary Design Review (PDR). The team functionally decomposed prelaunch and post-landing steps at three levels' of detail, or tiers, beginning with functional flow block diagrams (FFBDs). The third tier FFBDs were used to build logic networks and nominal timelines. Orion ground support equipment (GSE) was identified and mapped to each step. This information was subsequently used in developing lower level operations steps in a Ground Operations Planning Document PDR product. Subject matter experts for each spacecraft and GSE subsystem were used to define 5th - 95th percentile processing times for each FFBD step, using the Delphi Method. Discrete event simulations used this information and the logic network to provide processing timeline confidence intervals for launch rate assessments. The team also used the capabilities of the KSC Visualization Lab, the FFBDs and knowledge of the spacecraft, GSE and facilities to build visualizations of Orion pre-launch and postlanding processing at KSC. Visualizations were a powerful tool for communicating planned operations within the KSC community (i.e., Ground Systems design team), and externally to the Orion Project, Lockheed Martin spacecraft designers and other Constellation Program stakeholders during the SRR to PDR timeframe. Other operations planning

  5. The influence of team members on nurses' perceptions of transgressive behaviour in care relationships: A qualitative study.

    Science.gov (United States)

    Vandecasteele, Tina; Van Hecke, Ann; Duprez, Veerle; Beeckman, Dimitri; Debyser, Bart; Grypdonck, Maria; Verhaeghe, Sofie

    2017-10-01

    The aim of this study was to gain insight into the influence of team members in how nurses perceive and address patients' transgressive behaviour. Aggression and transgressive behaviour in health care have been a focus of research over the past few decades. Most studies have focused on individual nurses' experiences with aggression and transgressive behaviour. Literature examining group dynamics in nursing teams and team members' interactions in handling patients' transgressive behaviour is scarce. Qualitative interview study. Seven focus-group interviews and two individual interviews were carried out in 2014-2016. Twenty-four nurses were drawn from eight wards in three general hospitals. Interviews were analysed using the constant comparative method influenced by the grounded theory approach. While elaborating how they perceived and addressed transgressive behaviour, nurses disclosed how interactions with team members occurred. Several patterns arose. Nurses talk to one another, excuse one another, fill in for one another, warn one another and protect and safeguard one another. In these patterns in reaction to patients' transgressive behaviour, implicit group norms transpire, causing nursing teams to acquire their specific identity "as a group". Consequently, these informal group norms in nursing teams impinge how nurses feel threatened by patients' potential transgressive behaviour; gain protection from the group of nurses and conform to informal ward rules. The findings of this study can support intervention strategies aimed at supporting nurses and nursing teams in managing patient aggression and transgressive behaviour by identifying and explicating these group dynamics and team members' interactions. © 2017 John Wiley & Sons Ltd.

  6. Automated Planning and Scheduling for Planetary Rover Distributed Operations

    Science.gov (United States)

    Backes, Paul G.; Rabideau, Gregg; Tso, Kam S.; Chien, Steve

    1999-01-01

    Automated planning and Scheduling, including automated path planning, has been integrated with an Internet-based distributed operations system for planetary rover operations. The resulting prototype system enables faster generation of valid rover command sequences by a distributed planetary rover operations team. The Web Interface for Telescience (WITS) provides Internet-based distributed collaboration, the Automated Scheduling and Planning Environment (ASPEN) provides automated planning and scheduling, and an automated path planner provided path planning. The system was demonstrated on the Rocky 7 research rover at JPL.

  7. Strategies to Enhance Online Learning Teams. Team Assessment and Diagnostics Instrument and Agent-based Modeling

    Science.gov (United States)

    2010-08-12

    Strategies to Enhance Online Learning Teams Team Assessment and Diagnostics Instrument and Agent-based Modeling Tristan E. Johnson, Ph.D. Learning ...REPORT DATE AUG 2010 2. REPORT TYPE 3. DATES COVERED 00-00-2010 to 00-00-2010 4. TITLE AND SUBTITLE Strategies to Enhance Online Learning ...TeamsTeam Strategies to Enhance Online Learning Teams: Team Assessment and Diagnostics Instrument and Agent-based Modeling 5a. CONTRACT NUMBER 5b. GRANT

  8. NERSC Strategic Implementation Plan 2002-2006

    Energy Technology Data Exchange (ETDEWEB)

    Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

    2002-09-01

    This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.

  9. Using decadal climate prediction to characterize and manage changing drought and flood risks in Colorado

    Science.gov (United States)

    Lazrus, H.; Done, J.; Morss, R. E.

    2017-12-01

    A new branch of climate science, known as decadal prediction, seeks to predict the time-varying trajectory of climate over the next 3-30 years and not just the longer-term trends. Decadal predictions bring climate information into the time horizon of decision makers, particularly those tasked with managing water resources and floods whose master planning is often on the timescale of decades. Information from decadal predictions may help alleviate some aspects of vulnerability by helping to inform decisions that reduce drought and flood exposure and increase adaptive capacities including preparedness, response, and recovery. This presentation will highlight an interdisciplinary project - involving atmospheric and social scientists - on the development of decadal climate information and its use in decision making. The presentation will explore the skill and utility of decadal drought and flood prediction along Colorado's Front Range, an area experiencing rapid population growth and uncertain climate variability and climate change impacts. Innovative statistical and dynamical atmospheric modeling techniques explore the extent to which Colorado precipitation can be predicted on decadal scales using remote Pacific Ocean surface temperature patterns. Concurrently, stakeholder interviews with flood managers in Colorado are being used to explore the potential utility of decadal climate information. Combining the modeling results with results from the stakeholder interviews shows that while there is still significant uncertainty surrounding precipitation on decadal time scales, relevant and well communicated decadal information has potential to be useful for drought and flood management.

  10. Lessons from the Julie N - the value of a strong home team

    International Nuclear Information System (INIS)

    Ferland, J.M.

    1998-01-01

    A review of a successful cleanup effort made in response to the Julie N spill was presented. On September 27, 1996, the tanker Julie N spilled a total of 679,914 litres of oil into the Portland, Maine harbour. The spill oiled 22 kilometers of shoreline and led to a seven week cleanup effort involving more than 700 people from 60 oil spill removal organizations. The two networks of responders which were involved included the Home Team and the Away Team. The Home Team made sure that a high level of preparedness and aggressive response capability existed. It provided the response equipment and personnel resources used during the first 24 hours of the spill. It also opened a temporary command center and set up a field communication network with command. The Away Team was responsible for taking the spill from the first response emergency phase to a multi-faceted, long-term and controlled project phase. It was responsible for engaging additional contractor and equipment resources and provided logistical support of all response activities. It also developed waste disposal and equipment decontamination plans and conducted the environmental assessment. 16 refs., 1 tab

  11. Determinants of team-sport performance: implications for altitude training by team-sport athletes

    Science.gov (United States)

    Bishop, David J; Girard, Olivier

    2013-01-01

    Team sports are increasingly popular, with millions of participants worldwide. Athletes engaged in these sports are required to repeatedly produce skilful actions and maximal or near-maximal efforts (eg, accelerations, changes in pace and direction, sprints, jumps and kicks), interspersed with brief recovery intervals (consisting of rest or low-intensity to moderate-intensity activity), over an extended period of time (1–2 h). While performance in most team sports is dominated by technical and tactical proficiencies, successful team-sport athletes must also have highly-developed, specific, physical capacities. Much effort goes into designing training programmes to improve these physical capacities, with expected benefits for team-sport performance. Recently, some team sports have introduced altitude training in the belief that it can further enhance team-sport physical performance. Until now, however, there is little published evidence showing improved team-sport performance following altitude training, despite the often considerable expense involved. In the absence of such studies, this review will identify important determinants of team-sport physical performance that may be improved by altitude training, with potential benefits for team-sport performance. These determinants can be broadly described as factors that enhance either sprint performance or the ability to recover from maximal or near-maximal efforts. There is some evidence that some of these physical capacities may be enhanced by altitude training, but further research is required to verify that these adaptations occur, that they are greater than what could be achieved by appropriate sea-level training and that they translate to improved team-sport performance. PMID:24282200

  12. Determinants of team-sport performance: implications for altitude training by team-sport athletes.

    Science.gov (United States)

    Bishop, David J; Girard, Olivier

    2013-12-01

    Team sports are increasingly popular, with millions of participants worldwide. Athletes engaged in these sports are required to repeatedly produce skilful actions and maximal or near-maximal efforts (eg, accelerations, changes in pace and direction, sprints, jumps and kicks), interspersed with brief recovery intervals (consisting of rest or low-intensity to moderate-intensity activity), over an extended period of time (1-2 h). While performance in most team sports is dominated by technical and tactical proficiencies, successful team-sport athletes must also have highly-developed, specific, physical capacities. Much effort goes into designing training programmes to improve these physical capacities, with expected benefits for team-sport performance. Recently, some team sports have introduced altitude training in the belief that it can further enhance team-sport physical performance. Until now, however, there is little published evidence showing improved team-sport performance following altitude training, despite the often considerable expense involved. In the absence of such studies, this review will identify important determinants of team-sport physical performance that may be improved by altitude training, with potential benefits for team-sport performance. These determinants can be broadly described as factors that enhance either sprint performance or the ability to recover from maximal or near-maximal efforts. There is some evidence that some of these physical capacities may be enhanced by altitude training, but further research is required to verify that these adaptations occur, that they are greater than what could be achieved by appropriate sea-level training and that they translate to improved team-sport performance.

  13. Family planning: the unfinished agenda.

    Science.gov (United States)

    Cleland, John; Bernstein, Stan; Ezeh, Alex; Faundes, Anibal; Glasier, Anna; Innis, Jolene

    2006-11-18

    Promotion of family planning in countries with high birth rates has the potential to reduce poverty and hunger and avert 32% of all maternal deaths and nearly 10% of childhood deaths. It would also contribute substantially to women's empowerment, achievement of universal primary schooling, and long-term environmental sustainability. In the past 40 years, family-planning programmes have played a major part in raising the prevalence of contraceptive practice from less than 10% to 60% and reducing fertility in developing countries from six to about three births per woman. However, in half the 75 larger low-income and lower-middle income countries (mainly in Africa), contraceptive practice remains low and fertility, population growth, and unmet need for family planning are high. The cross-cutting contribution to the achievement of the Millennium Development Goals makes greater investment in family planning in these countries compelling. Despite the size of this unfinished agenda, international funding and promotion of family planning has waned in the past decade. A revitalisation of the agenda is urgently needed. Historically, the USA has taken the lead but other governments or agencies are now needed as champions. Based on the sizeable experience of past decades, the key features of effective programmes are clearly established. Most governments of poor countries already have appropriate population and family-planning policies but are receiving too little international encouragement and funding to implement them with vigour. What is currently missing is political willingness to incorporate family planning into the development arena.

  14. Trauma team leaders' non-verbal communication: video registration during trauma team training.

    Science.gov (United States)

    Härgestam, Maria; Hultin, Magnus; Brulin, Christine; Jacobsson, Maritha

    2016-03-25

    There is widespread consensus on the importance of safe and secure communication in healthcare, especially in trauma care where time is a limiting factor. Although non-verbal communication has an impact on communication between individuals, there is only limited knowledge of how trauma team leaders communicate. The purpose of this study was to investigate how trauma team members are positioned in the emergency room, and how leaders communicate in terms of gaze direction, vocal nuances, and gestures during trauma team training. Eighteen trauma teams were audio and video recorded during trauma team training in the emergency department of a hospital in northern Sweden. Quantitative content analysis was used to categorize the team members' positions and the leaders' non-verbal communication: gaze direction, vocal nuances, and gestures. The quantitative data were interpreted in relation to the specific context. Time sequences of the leaders' gaze direction, speech time, and gestures were identified separately and registered as time (seconds) and proportions (%) of the total training time. The team leaders who gained control over the most important area in the emergency room, the "inner circle", positioned themselves as heads over the team, using gaze direction, gestures, vocal nuances, and verbal commands that solidified their verbal message. Changes in position required both attention and collaboration. Leaders who spoke in a hesitant voice, or were silent, expressed ambiguity in their non-verbal communication: and other team members took over the leader's tasks. In teams where the leader had control over the inner circle, the members seemed to have an awareness of each other's roles and tasks, knowing when in time and where in space these tasks needed to be executed. Deviations in the leaders' communication increased the ambiguity in the communication, which had consequences for the teamwork. Communication cannot be taken for granted; it needs to be practiced

  15. Team Proactivity as a Linking Mechanism between Team Creative Efficacy, Transformational Leadership, and Risk-Taking Norms and Team Creative Performance

    Science.gov (United States)

    Shin, Yuhyung; Eom, Chanyoung

    2014-01-01

    Despite the growing body of research on creativity in team contexts, very few attempts have been made to explore the team-level antecedents and the mediating processes of team creative performance on the basis of a theoretical framework. To address this gap, drawing on Paulus and Dzindolet's (2008) group creativity model, this study proposed team…

  16. Psychometric test of the Team Climate Inventory-short version investigated in Dutch quality improvement teams

    OpenAIRE

    Nieboer Anna P; Strating Mathilde MH

    2009-01-01

    Abstract Background Although some studies have used the Team Climate Inventory within teams working in health care settings, none of these included quality improvement teams. The aim of our study is to investigate the psychometric properties of the 14-item version of the Team Climate Inventory in healthcare quality improvement teams participating in a Dutch quality collaborative. Methods This study included quality improvement teams participating in the Care for Better improvement program for...

  17. Innovation in globally distributed teams: the role of LMX, communication frequency, and member influence on team decisions.

    Science.gov (United States)

    Gajendran, Ravi S; Joshi, Aparna

    2012-11-01

    For globally distributed teams charged with innovation, member contributions to the team are crucial for effective performance. Prior research, however, suggests that members of globally distributed teams often feel isolated and excluded from their team's activities and decisions. How can leaders of such teams foster member inclusion in team decisions? Drawing on leader-member exchange (LMX) theory, we propose that for distributed teams, LMX and communication frequency jointly shape member influence on team decisions. Findings from a test of our hypotheses using data from 40 globally distributed teams suggest that LMX can enhance member influence on team decisions when it is sustained through frequent leader-member communication. This joint effect is strengthened as team dispersion increases. At the team level, member influence on team decisions has a positive effect on team innovation. (c) 2012 APA, all rights reserved.

  18. Comparison of indicators of the team game performance between the U.S. team and teams of his rivals at the World Championship Men 2010

    OpenAIRE

    Rédli, Tomáš

    2011-01-01

    Title of thesis: Comparison of indicators of the team game performance between the U.S. team and teams of his rivals at the Wprld Championship Men 2010 Aim of the thesis: The aim of the thesis is to compare indicators of the team game performance of Team USA and its rivals. On the basis of this comparison will be a confrontation of both teams after the match and find differences in their game performance. Methods of the thesis: The main method of the thesis is quantitative analysis of 6 selec...

  19. Honor among thieves: The interaction of team and member deviance on trust in the team.

    Science.gov (United States)

    Schabram, Kira; Robinson, Sandra L; Cruz, Kevin S

    2018-05-03

    In this article, we examine member trust in deviant teams. We contend that a member's trust in his or her deviant team depends on the member's own deviant actions; although all members will judge the actions of their deviant teams as rational evidence that they should not be trusted, deviant members, but not honest members, can hold on to trust in their teams because of a sense of connection to the team. We tested our predictions in a field study of 562 members across 111 teams and 24 organizations as well as in an experiment of 178 participants in deviant and non-deviant teams. Both studies show that honest members experience a greater decline in trust as team deviance goes up. Moreover, our experiment finds that deviant members have as much trust in their deviant teams as honest members do in honest teams, but only in teams with coordinated rather than independent acts of deviance, in which deviant members engage in a variety of ongoing dynamics foundational to a sense of connection and affective-based trust. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  20. Tinkering self-efficacy and team interaction on freshman engineering design teams

    Science.gov (United States)

    Richardson, Arlisa Labrie

    This study utilizes Bandura's theory of self-efficacy as a framework to examine the development of tinkering skills white working on a freshman engineering design team. The four sources of self-efficacy were analyzed in the context of tinkering within the design team. The research question, 'Does tinkering self-efficacy change for female students during the Freshman Engineering Design class while working on mixed sex teams?', was addressed using quantitative data collection and field observations. Approximately 41 students enrolled in a freshman engineering design class at a public university in the southwest participated by providing self-reports about their tinkering involvement during each design project. In addition, three mixed-sex student teams were observed while working to complete the course design projects. An observation protocol based on Bandura's sources of self efficacy, was used to document tinkering interactions within the three observed teams. The results revealed that Bandura's sources of self-efficacy influenced tinkering involvement. The self-efficacy source, performance accomplishment measured through prior tinkering experience, was the most influential on tinkering involvement. Unlike Bandura's ranking of influence, verbal persuasion was shown to correlate with more tinkering behaviors than the observation of others. The number of females on a team had no impact on tinkering involvement. Tinkering involvement did not change as students progressed from one project to another. However, the competitive nature of the design project appeared to have a negative impact on tinkering involvement and the division of tasks within the team. In addition, a difference was found in the female students' perception of their tinkering involvement and observation of their tinkering involvement. The findings suggest that effective implementation of teamwork including teamwork preparation, more emphasis on the design process and the elimination of competition