WorldWideScience

Sample records for database construction project

  1. Application of ABWR construction database to nuclear power plant project

    International Nuclear Information System (INIS)

    Takashima, Atsushi; Katsube, Yasuhiko

    1999-01-01

    Tokyo Electric Power Company (TEPCO) completed the construction of Kashiwazaki-Kariwa Nuclear Power Station Unit No. 6 and No. 7 (K-6/7) as the first advanced boiling water reactors (ABWR) in the world successfully. K-6 and K-7 started their commercial operations in November, 1996 and in July, 1997 respectively. We consider ABWR as a standard BWR in the world as well as in Japan because ABWR is highly reputed. However, because the interval of our nuclear power plant construction is going to be longer, our engineering level on plant construction will be declining. Hence it is necessary for us to maintain our engineering level. In addition to this circumstance, we are planning to wide application of separated purchase orders for further cost reduction. Also there is an expectation for our contribution to ABWR plant constructions overseas. As facing these circumstances, we have developed a construction database based on our experience for ABWR construction. As the first step of developing the database for these use, we analyzed our own activities in the previous ABWR construction. Through this analysis, we could define activity units of which the project consists. As the second step, we clarified the data which are treated in each activity unit and the interface among them. By taking these steps, we could develop our database efficiently. (author)

  2. Construction of Database for Pulsating Variable Stars

    Science.gov (United States)

    Chen, B. Q.; Yang, M.; Jiang, B. W.

    2011-07-01

    A database for the pulsating variable stars is constructed for Chinese astronomers to study the variable stars conveniently. The database includes about 230000 variable stars in the Galactic bulge, LMC and SMC observed by the MACHO (MAssive Compact Halo Objects) and OGLE (Optical Gravitational Lensing Experiment) projects at present. The software used for the construction is LAMP, i.e., Linux+Apache+MySQL+PHP. A web page is provided to search the photometric data and the light curve in the database through the right ascension and declination of the object. More data will be incorporated into the database.

  3. Fiscal 1997 research report. Basic research project on improving energy consumption efficiency in developing countries (Database construction); 1998 nendo hatten tojokoku energy shohi koritsuka kiso chosa jigyo hokokusho. Database kochiku jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-01

    The New Energy and Industrial Technology Development Organization (NEDO) in fiscal 1993 started a database construction project, which involves energy conservation related primary information on the 11 countries concerned, for encouraging 11 Asian countries, namely, Japan, China, Indonesia, the Philippines, Thailand, Malaysia, Taiwan, Korea, Vietnam, Myanmar, and Pakistan, to promote their energy conservation endeavors. As part of the database construction effort under this research project, the so-far accomplished collection of and analysis into energy related information about the countries, surveys of the utilization and popularization of databases, and development of database systems are taken into consideration. On the basis of these efforts to improve on the database systems for enhanced operability, a program is formulated for database diffusion under which data are collected and updated for storage in databases. Also exerted under the program are endeavors to make use of the above-said database systems and to disseminate the constructed databases into the 11 countries for effective utilization. In the future, it is desired that the NEDO database will win popularity in the 11 countries and be utilized in their formulation of domestic energy conservation policies. (NEDO)

  4. Construction of the Database for Pulsating Variable Stars

    Science.gov (United States)

    Chen, Bing-Qiu; Yang, Ming; Jiang, Bi-Wei

    2012-01-01

    A database for pulsating variable stars is constructed to favor the study of variable stars in China. The database includes about 230,000 variable stars in the Galactic bulge, LMC and SMC observed in an about 10 yr period by the MACHO(MAssive Compact Halo Objects) and OGLE(Optical Gravitational Lensing Experiment) projects. The software used for the construction is LAMP, i.e., Linux+Apache+MySQL+PHP. A web page is provided for searching the photometric data and light curves in the database through the right ascension and declination of an object. Because of the flexibility of this database, more up-to-date data of variable stars can be incorporated into the database conveniently.

  5. Economic and Structural Database for the MEDPRO Project

    OpenAIRE

    Paroussos, Leonidas; Tsani, Stella; Vrontisi, Zoi

    2013-01-01

    This report presents the economic and structural database compiled for the MEDPRO project. The database includes governance, infrastructure, finance, environment, energy, agricultural data and development indicators for the 11 southern and eastern Mediterranean countries (SEMCs) studied in the MEDPRO project. The report further details the data and the methods used for the construction of social accounting, bilateral trade, consumption and investment matrices for each of the SEMCs.

  6. FY 1997 basic survey project (database construction project) for enhancing energy consumption efficiency in developing countries; 1997 nendo hatten tojokoku energy shohi koritsuka kiso chosa jigyo. Database kochiku jigyo hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    NEDO is promoting a database construction project to collect and supply various technical/systematical information on energy related data and energy effective utilization. In FY 1997, about the Philippines, Indonesia and China, the data collected in a year were renewed, and seminar/workshop were held as a part of the promotion activities. About Thailand, Malaysia, Korea, Taiwan and Japan, Japan has independently been collecting the data. Also in FY 1997, Japan arranged the existing data and arranged/collected the data. About Vietnam, India, Myanmer and Pakistan, which became the objects for the project newly in FY 1996, the state of data arrangement was confirmed and the data were collected. Moreover, functional improvement of the system was made so that each country can use the database more easily and maintain the data independently. (NEDO)

  7. The PEP-II project-wide database

    International Nuclear Information System (INIS)

    Chan, A.; Calish, S.; Crane, G.; MacGregor, I.; Meyer, S.; Wong, J.

    1995-05-01

    The PEP-II Project Database is a tool for monitoring the technical and documentation aspects of this accelerator construction. It holds the PEP-II design specifications, fabrication and installation data in one integrated system. Key pieces of the database include the machine parameter list, magnet and vacuum fabrication data. CAD drawings, publications and documentation, survey and alignment data and property control. The database can be extended to contain information required for the operations phase of the accelerator and detector. Features such as viewing CAD drawing graphics from the database will be implemented in the future. This central Oracle database on a UNIX server is built using ORACLE Case tools. Users at the three collaborating laboratories (SLAC, LBL, LLNL) can access the data remotely, using various desktop computer platforms and graphical interfaces

  8. USAID Anticorruption Projects Database

    Data.gov (United States)

    US Agency for International Development — The Anticorruption Projects Database (Database) includes information about USAID projects with anticorruption interventions implemented worldwide between 2007 and...

  9. Construction of a bibliographic information database and development of retrieval system for research reports in nuclear science and technology (II)

    International Nuclear Information System (INIS)

    Han, Duk Haeng; Kim, Tae Whan; Choi, Kwang; Yoo, An Na; Keum, Jong Yong; Kim, In Kwon

    1996-05-01

    The major goal of this project is to construct a bibliographic information database in nuclear engineering and to develop a prototype retrieval system. To give an easy access to microfiche research report, this project has accomplished the construction of microfiche research reports database and the development of retrieval system. The results of the project are as follows; 1. Microfiche research reports database was constructed by downloading from DOE Energy, NTIS, INIS. 2. The retrieval system was developed in host and web version using access point such as title, abstracts, keyword, report number. 6 tabs., 8 figs., 11 refs. (Author) .new

  10. Construction of a bibliographic information database and development of retrieval system for research reports in nuclear science and technology (II)

    Energy Technology Data Exchange (ETDEWEB)

    Han, Duk Haeng; Kim, Tae Whan; Choi, Kwang; Yoo, An Na; Keum, Jong Yong; Kim, In Kwon [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1996-05-01

    The major goal of this project is to construct a bibliographic information database in nuclear engineering and to develop a prototype retrieval system. To give an easy access to microfiche research report, this project has accomplished the construction of microfiche research reports database and the development of retrieval system. The results of the project are as follows; 1. Microfiche research reports database was constructed by downloading from DOE Energy, NTIS, INIS. 2. The retrieval system was developed in host and web version using access point such as title, abstracts, keyword, report number. 6 tabs., 8 figs., 11 refs. (Author) .new.

  11. Fiscal 1998 research report. Construction model project of the human sensory database; 1998 nendo ningen kankaku database kochiku model jigyo seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This report summarizes the fiscal 1998 research result on construction of the human sensory database. The human sensory database for evaluating working environment was constructed on the basis of the measurement result on human sensory data (stress and fatigue) of 400 examinees at fields (transport field, control room and office) and in a laboratory. By using the newly developed standard measurement protocol for evaluating summer clothing (shirt, slacks and underwear), the database composed of the evaluation experiment results and the comparative experiment results on human physiological and sensory data of aged and young people was constructed. The database is featured by easy retrieval of various information concerned corresponding to requirements of tasks and use purposes. For evaluating the mass data with large time variation read corresponding to use purposes for every scene, the data detection support technique was adopted paying attention to physical and psychological variable phases, and mind and body events. A meaning of reaction and a hint for necessary measures are showed for every phase and event. (NEDO)

  12. The Eruption Forecasting Information System (EFIS) database project

    Science.gov (United States)

    Ogburn, Sarah; Harpel, Chris; Pesicek, Jeremy; Wellik, Jay; Pallister, John; Wright, Heather

    2016-04-01

    The Eruption Forecasting Information System (EFIS) project is a new initiative of the U.S. Geological Survey-USAID Volcano Disaster Assistance Program (VDAP) with the goal of enhancing VDAP's ability to forecast the outcome of volcanic unrest. The EFIS project seeks to: (1) Move away from relying on the collective memory to probability estimation using databases (2) Create databases useful for pattern recognition and for answering common VDAP questions; e.g. how commonly does unrest lead to eruption? how commonly do phreatic eruptions portend magmatic eruptions and what is the range of antecedence times? (3) Create generic probabilistic event trees using global data for different volcano 'types' (4) Create background, volcano-specific, probabilistic event trees for frequently active or particularly hazardous volcanoes in advance of a crisis (5) Quantify and communicate uncertainty in probabilities A major component of the project is the global EFIS relational database, which contains multiple modules designed to aid in the construction of probabilistic event trees and to answer common questions that arise during volcanic crises. The primary module contains chronologies of volcanic unrest, including the timing of phreatic eruptions, column heights, eruptive products, etc. and will be initially populated using chronicles of eruptive activity from Alaskan volcanic eruptions in the GeoDIVA database (Cameron et al. 2013). This database module allows us to query across other global databases such as the WOVOdat database of monitoring data and the Smithsonian Institution's Global Volcanism Program (GVP) database of eruptive histories and volcano information. The EFIS database is in the early stages of development and population; thus, this contribution also serves as a request for feedback from the community.

  13. The GIOD Project-Globally Interconnected Object Databases

    CERN Document Server

    Bunn, J J; Newman, H B; Wilkinson, R P

    2001-01-01

    The GIOD (Globally Interconnected Object Databases) Project, a joint effort between Caltech and CERN, funded by Hewlett Packard Corporation, has investigated the use of WAN-distributed Object Databases and Mass Storage systems for LHC data. A prototype small- scale LHC data analysis center has been constructed using computing resources at Caltechs Centre for advanced Computing Research (CACR). These resources include a 256 CPU HP Exemplar of ~4600 SPECfp95, a 600 TByte High Performance Storage System (HPSS), and local/wide area links based on OC3 ATM. Using the exemplar, a large number of fully simulated CMS events were produced, and used to populate an object database with a complete schema for raw, reconstructed and analysis objects. The reconstruction software used for this task was based on early codes developed in preparation for the current CMS reconstruction program, ORCA. (6 refs).

  14. Diskette-based database covering standards etc. of relevance to the construction of wind turbines

    International Nuclear Information System (INIS)

    1994-05-01

    The project concerns the development of the database ''Diskettebaseret database med vindmoellestandarder'' (diskette-based database containing wind turbine standards), which contains information about standards, recommendations and other technical documents of relevance for the design, construction and approval of wind mills. The information in the database covers data from Denmark, UK, Germany, Holland and USA together with data from internationally recognized standards and recommendations. The database is contained on a single PC-diskette, which also contains the purpose-built userfriendly serchsoftware. About 5500 records are included in the database. The last edition of the database was updated January 1994. (au)

  15. Construction of a bibliographic information database and a web directory for the nuclear science and engineering

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Jeong Hoon; Kim, Tae Whan; Lee, Ji Ho; Chun, Young Chun; Yu, An Na

    2005-11-15

    The objective of this project is to construct the bibliographic information database and the web directory in the nuclear field. Its construction is very timely and important. Because nuclear science and technology has an considerable effect all over the other sciences and technologies due to its property of giant and complex engineering. We aimed to firmly build up a basis of efficient management of the bibliographic information database and the web directory in the nuclear field. The results of this project that we achieved in this year are as follows : first, construction of the bibliographic information database in the nuclear field(the target title: 1,500 titles ; research report: 1,000 titles, full-text report: 250 titles, full-text article: 250 titles). Second, completion of construction of the web directory in the nuclear field by using SWING (the total figure achieved : 2,613 titles). We plan that we will positively give more information to the general public interested in the nuclear field and to the experts of the field through this bibliographic information database on KAERI's home page, KAERI's electronic library and other related sites as well as participation at various seminars and meetings related to the nuclear field.

  16. Operation environment construction of geological information database for high level radioactive waste geological disposal

    International Nuclear Information System (INIS)

    Wang Peng; Gao Min; Huang Shutao; Wang Shuhong; Zhao Yongan

    2014-01-01

    To fulfill the requirements of data storage and management in HLW geological disposal, a targeted construction method for data operation environment was proposed in this paper. The geological information database operation environment constructed by this method has its unique features. And it also will be the important support for HLW geological disposal project and management. (authors)

  17. Evaluating aggregate terrestrial impacts of road construction projects for advanced regional mitigation.

    Science.gov (United States)

    Thorne, James H; Girvetz, Evan H; McCoy, Michael C

    2009-05-01

    This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.

  18. Evaluating Aggregate Terrestrial Impacts of Road Construction Projects for Advanced Regional Mitigation

    Science.gov (United States)

    Thorne, James H.; Girvetz, Evan H.; McCoy, Michael C.

    2009-05-01

    This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.

  19. The PEP-II/BaBar Project-Wide Database using World Wide Web and Oracle*Case

    International Nuclear Information System (INIS)

    Chan, A.; Crane, G.; MacGregor, I.; Meyer, S.

    1995-12-01

    The PEP-II/BaBar Project Database is a tool for monitoring the technical and documentation aspects of the accelerator and detector construction. It holds the PEP-II/BaBar design specifications, fabrication and installation data in one integrated system. Key pieces of the database include the machine parameter list, components fabrication and calibration data, survey and alignment data, property control, CAD drawings, publications and documentation. This central Oracle database on a UNIX server is built using Oracle*Case tools. Users at the collaborating laboratories mainly access the data using World Wide Web (WWW). The Project Database is being extended to link to legacy databases required for the operations phase

  20. NREL: U.S. Life Cycle Inventory Database - About the LCI Database Project

    Science.gov (United States)

    About the LCI Database Project The U.S. Life Cycle Inventory (LCI) Database is a publicly available database that allows users to objectively review and compare analysis results that are based on similar source of critically reviewed LCI data through its LCI Database Project. NREL's High-Performance

  1. Constructing a Geology Ontology Using a Relational Database

    Science.gov (United States)

    Hou, W.; Yang, L.; Yin, S.; Ye, J.; Clarke, K.

    2013-12-01

    In geology community, the creation of a common geology ontology has become a useful means to solve problems of data integration, knowledge transformation and the interoperation of multi-source, heterogeneous and multiple scale geological data. Currently, human-computer interaction methods and relational database-based methods are the primary ontology construction methods. Some human-computer interaction methods such as the Geo-rule based method, the ontology life cycle method and the module design method have been proposed for applied geological ontologies. Essentially, the relational database-based method is a reverse engineering of abstracted semantic information from an existing database. The key is to construct rules for the transformation of database entities into the ontology. Relative to the human-computer interaction method, relational database-based methods can use existing resources and the stated semantic relationships among geological entities. However, two problems challenge the development and application. One is the transformation of multiple inheritances and nested relationships and their representation in an ontology. The other is that most of these methods do not measure the semantic retention of the transformation process. In this study, we focused on constructing a rule set to convert the semantics in a geological database into a geological ontology. According to the relational schema of a geological database, a conversion approach is presented to convert a geological spatial database to an OWL-based geological ontology, which is based on identifying semantics such as entities, relationships, inheritance relationships, nested relationships and cluster relationships. The semantic integrity of the transformation was verified using an inverse mapping process. In a geological ontology, an inheritance and union operations between superclass and subclass were used to present the nested relationship in a geochronology and the multiple inheritances

  2. Database Support for Workflow Management: The WIDE Project

    NARCIS (Netherlands)

    Grefen, P.W.P.J.; Pernici, B; Sánchez, G.; Unknown, [Unknown

    1999-01-01

    Database Support for Workflow Management: The WIDE Project presents the results of the ESPRIT WIDE project on advanced database support for workflow management. The book discusses the state of the art in combining database management and workflow management technology, especially in the areas of

  3. Waste Tank Vapor Project: Tank vapor database development

    International Nuclear Information System (INIS)

    Seesing, P.R.; Birn, M.B.; Manke, K.L.

    1994-09-01

    The objective of the Tank Vapor Database (TVD) Development task in FY 1994 was to create a database to store, retrieve, and analyze data collected from the vapor phase of Hanford waste tanks. The data needed to be accessible over the Hanford Local Area Network to users at both Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The data were restricted to results published in cleared reports from the laboratories analyzing vapor samples. Emphasis was placed on ease of access and flexibility of data formatting and reporting mechanisms. Because of time and budget constraints, a Rapid Application Development strategy was adopted by the database development team. An extensive data modeling exercise was conducted to determine the scope of information contained in the database. a A SUN Sparcstation 1000 was procured as the database file server. A multi-user relational database management system, Sybase reg-sign, was chosen to provide the basic data storage and retrieval capabilities. Two packages were chosen for the user interface to the database: DataPrism reg-sign and Business Objects trademark. A prototype database was constructed to provide the Waste Tank Vapor Project's Toxicology task with summarized and detailed information presented at Vapor Conference 4 by WHC, PNL, Oak Ridge National Laboratory, and Oregon Graduate Institute. The prototype was used to develop a list of reported compounds, and the range of values for compounds reported by the analytical laboratories using different sample containers and analysis methodologies. The prototype allowed a panel of toxicology experts to identify carcinogens and compounds whose concentrations were within the reach of regulatory limits. The database and user documentation was made available for general access in September 1994

  4. Solid Waste Projection Model: Database (Version 1.4)

    International Nuclear Information System (INIS)

    Blackburn, C.; Cillan, T.

    1993-09-01

    The Solid Waste Projection Model (SWPM) system is an analytical tool developed by Pacific Northwest Laboratory (PNL) for Westinghouse Hanford Company (WHC). The SWPM system provides a modeling and analysis environment that supports decisions in the process of evaluating various solid waste management alternatives. This document, one of a series describing the SWPM system, contains detailed information regarding the software and data structures utilized in developing the SWPM Version 1.4 Database. This document is intended for use by experienced database specialists and supports database maintenance, utility development, and database enhancement. Those interested in using the SWPM database should refer to the SWPM Database User's Guide. This document is available from the PNL Task M Project Manager (D. L. Stiles, 509-372-4358), the PNL Task L Project Manager (L. L. Armacost, 509-372-4304), the WHC Restoration Projects Section Manager (509-372-1443), or the WHC Waste Characterization Manager (509-372-1193)

  5. Lessons Learned from Past and Ongoing Construction Projects

    International Nuclear Information System (INIS)

    Tabatabai, Omid

    2011-01-01

    Full text of publication follows: The nuclear industry in the U.S. faced many construction quality and design issues in the 1970's and 1980's. In 1984, the NRC issued NUREG-1055, 'Improving Quality and the Assurance of Quality in the Design and Construction of Nuclear Power Plants,' to document the lessons learned from nuclear power plant (NPP) construction in the U.S. In recent years, several countries have begun either planning for or actually constructing new NPPs. For instance, in the U.S., the nuclear industry has submitted several combined license and design certification applications to the NRC for licensing reviews and approval to build 30+ new NPP units. Latest construction experience from countries that are currently building new NPPs indicate that these countries are dealing with challenges that are similar to those issues that caused major quality assurance problems, delays, or even termination of several projects in U.S. in the 70's and 80's. The U.S. NRC is pro-actively taking measures to improve its regulatory programs as well as construction oversight activities before new NPPs construction begin in the U.S. In late 2007, the U.S. NRC's Office of New Reactors established a construction experience program (ConE) to obtain and evaluate construction and operating experience events and to identify the lessons learned from these events. In March 2009, the NRC published an Office Instruction to provide a process for incorporating the lessons learned and insights from the design, construction, and operation of the international and domestic NPPs into the licensing reviews, inspections, and construction of new reactors in the U.S. Additionally, the ConE program staff developed a Web-enabled database to store, manage, and make construction experience information available to all NRC technical reviewers as well as inspectors. Because this database contains information from other countries' regulators that are considered

  6. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  7. Planned and ongoing projects (pop) database: development and results.

    Science.gov (United States)

    Wild, Claudia; Erdös, Judit; Warmuth, Marisa; Hinterreiter, Gerda; Krämer, Peter; Chalon, Patrice

    2014-11-01

    The aim of this study was to present the development, structure and results of a database on planned and ongoing health technology assessment (HTA) projects (POP Database) in Europe. The POP Database (POP DB) was set up in an iterative process from a basic Excel sheet to a multifunctional electronic online database. The functionalities, such as the search terminology, the procedures to fill and update the database, the access rules to enter the database, as well as the maintenance roles, were defined in a multistep participatory feedback loop with EUnetHTA Partners. The POP Database has become an online database that hosts not only the titles and MeSH categorizations, but also some basic information on status and contact details about the listed projects of EUnetHTA Partners. Currently, it stores more than 1,200 planned, ongoing or recently published projects of forty-three EUnetHTA Partners from twenty-four countries. Because the POP Database aims to facilitate collaboration, it also provides a matching system to assist in identifying similar projects. Overall, more than 10 percent of the projects in the database are identical both in terms of pathology (indication or disease) and technology (drug, medical device, intervention). In addition, approximately 30 percent of the projects are similar, meaning that they have at least some overlap in content. Although the POP DB is successful concerning regular updates of most national HTA agencies within EUnetHTA, little is known about its actual effects on collaborations in Europe. Moreover, many non-nationally nominated HTA producing agencies neither have access to the POP DB nor can share their projects.

  8. Accounting for the inaccuracies in demand forecasts and construction cost estimations in transport project evaluation

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2014-01-01

    For decades researchers have claimedthat particularly demand forecasts and construction cost estimations are assigned with/affected by a large degree of uncertainty. Massively, articles,research documents and reports agree that there exists a tendencytowards underestimating the costs...... in demand and cost estimations and hence the evaluation of transport infrastructure projects. Currently, research within this area is scarce and scattered with no commonagreement on how to embed and operationalise the huge amount of empiricaldata that exist within the frame of Optimism Bias. Therefore...... convertingdeterministic benefit-cost ratios (BCRs) into stochasticinterval results. A new data collection (2009–2013) forms the empirical basis for any risk simulation embeddedwithin the so-calledUP database (UNITE project database),revealing the inaccuracy of both construction costs and demandforecasts. Accordingly...

  9. Optimizing strategy software for repetitive construction projects within multi-mode resources

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-09-01

    Full Text Available Estimating tender data for specific project is the most essential part in construction areas as of contractor’s view such as: proposed project duration with corresponding gross value and cash flows. This paper focuses on how to calculate tender data using Optimizing Strategy Software (OSS for repetitive construction projects with identical activity’s duration in case of single number of crew such as: project duration, project/bid price, project maximum working capital, and project net present value of the studied project. A simplified multi-objective optimization software (OSS will be presented that creates best tender data to contractor compared with more feasible options generated from multi-mode resources in a given project. OSS is intended to give more scenarios which provide practical support for typical construction contractors who need to optimize resource utilization in order to minimize project duration, project/bid price, and project maximum working capital while maximizing its net present value simultaneously. OSS is designed by java programing code system to provide a number of new and unique capabilities, including: (1 Ranking the obtained optimal plans according to a set of planner specified weights representing the relative importance of duration, price, maximum working capital and net present value in the analyzed project; (2 Visualizing and viewing the generated optimal trade-off; and (3 Providing seamless integration with available project management calculations. In order to provide the aforementioned capabilities of OSS, the system is implemented and developed in four main modules: (1 A user interface module; (2 A database module; (3 A running module; (4 A connecting module. At the end of the paper, an illustrative example will be presented to demonstrate and verify the applications of the proposed software (OSS to an optimization expressway of repetitive construction project.

  10. Causes of Construction Delays in Qatar Construction Projects

    OpenAIRE

    Murat Gunduz; Mohanad H. A. AbuHassan

    2016-01-01

    Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction ...

  11. REPNET: project scheduling and workflow optimization for Construction Projects

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Project planning and control are core processes for construction management. In practice project planning is achieved by network - based techniques like Precedence Diagramming Method (PDM.Indeed many researchers and practitioners claims that networking techniques as such do not provide a suitable model for construction projects. Construction process modeling should incorporate for specific features of resource flows through project activities. So an improved resource scheduling method for construction is developed, called REPNET, based on a precedence network plotted on a resource–space chart and presented with a flow-line chart. The heuristics of REPNET are used to carry out resource timing while optimizing processes flows and resource usage. The method has been tested on a sample project.

  12. Construction of ideas and practice for 'nuclear geology featured database'

    International Nuclear Information System (INIS)

    Hu Guanglin; Feng Kai

    2010-01-01

    East China Institute of Technology is engaged in training person in areas of Nuclear Resource exploration. It is Nuclear Featured multi-Institute of Technology. At present, our library was done several collections system, which were focusing on Uranium and Geology. The library decide to be organizational force to construct Nuclear and Geology Featured database and put into use as soon as possible. 'Nuclear Geology Featured Database' put forward for construction principles of uniqueness, standardization, completeness, practicality, security and respecting knowledge property rights. The database contains 'Map and Table', 'periodical thesis', 'dissertations', 'conference papers', newspapers', 'books', ect. The types of literatures mainly includes monographs, periodicals, dissertations, conference papers, newspapers, as well as videos. The database can get information by ways of searching titles, authors and texts, and gradually become a more authoritative Nuclear Geology Database for study. (authors)

  13. The detector of BES III muon constructs with the quality control database

    International Nuclear Information System (INIS)

    Yao Ning; Chinese Academy of Sciences, Beijing; Zheng Guoheng; Yang Lei; Zhang Jiawen; Han Jifeng; Xie Yuguang; Zhao Jianbing; Chen Jin

    2006-01-01

    Because of these softwares' characters, the authors use MySQL, PHP, Apache to construct our quality control database. The authors show the structure of BES MUON Detector and explain the reason why we must construct database. The authors show the results that our database can present. People can access the system through its web site, which retrieves data on request from the database and can display results in dynamically created images. The database is the transparent technique support platform of the maintenance of the detector. (authors)

  14. Effective Safety Management in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  15. Organizational analysis of construction projects

    OpenAIRE

    Hughes, Will

    1989-01-01

    This research project is about the analysis of construction project organizations. The work is based on organizational theory and is a development of Linear Responsibility Analysis (LRA). The aim is to assess the extent to which project success is affected by organizational structure. The analysis of four public sector case studies raises several issues. First is the need for a systematic model of describing and analysing construction project environments. A framework has been developed that ...

  16. Trevino Project: a fast-track approach for a small construction project

    International Nuclear Information System (INIS)

    Schick, C.J.; Lynn, N.S.

    1982-01-01

    The approach to a construction project can vary according to the size, location, and degree of difficulty associated with the project. This paper deals with one approach that can be taken to a small construction project, the fast-track approach. A small construction project can be defined as a project having less than $20 million capital cost or a project with a low degree of difficulty. This approach is very applicable to in-situ leaching uranium projects, small precious metal operations, etc. The approach to the small project is that of fast-tracking the project in order to minimize the time over which capital expenditure occurs and also to reduce the indirect costs of field expense, construction supplies, construction equipment, etc. In order to fast-track a project it is necessary to do a very precise job on the preliminary phases of the project such as preliminary engineering, plant site location, environmental permits, etc. 2 figures, 2 tables

  17. Construction Managers’ Perception of the Factors Affecting Sustainability in Construction Projects

    OpenAIRE

    Reza Taheriattar; Morvarid Farzanehrafat

    2014-01-01

    Sustainable construction is a comprehensive concept which requires long-term planning. Moreover, construction managers play a key role in leading, planning and scheduling of a construction project. As a result, sustainability of construction projects can be affected by construction managers’ decisions. In addition, for greater development of sustainable construction, affecting factors should firstly be notified. Therefore, it seems necessary to investigate construction managers’ perception of...

  18. Open Source Vulnerability Database Project

    Directory of Open Access Journals (Sweden)

    Jake Kouns

    2008-06-01

    Full Text Available This article introduces the Open Source Vulnerability Database (OSVDB project which manages a global collection of computer security vulnerabilities, available for free use by the information security community. This collection contains information on known security weaknesses in operating systems, software products, protocols, hardware devices, and other infrastructure elements of information technology. The OSVDB project is intended to be the centralized global open source vulnerability collection on the Internet.

  19. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  20. Managing Pre-Construction and Construction Risks on Project Sites in Abuja-Nigeria

    Directory of Open Access Journals (Sweden)

    Jimoh R.A.

    2016-03-01

    Full Text Available Managing risks in construction projects has been acknowledged as a key direction process for the purposes of attaining the project goal in terms of time, cost, quality, safety, and environmental sustainability. Hence, the paper evaluated pre-construction and construction risks on active project sites in Abuja-Nigeria. This was achieved using survey method through the self-administration of 35 questionnaires to the professionals handling the 35 identified projects being undertaking at that time. Results showed that errors and omissions in design and improperly defined project scope had mean score values of 3.03 and 2.54, respectively, were the construction risks most experienced by the professionals during pre-construction. On the other hand, fluctuation in market prices and delays with mean score values of 3.14 and 2.74, respectively, were the construction risks experienced by the professionals during the construction phase of the projects. It is recommended that procurement methods such as construction management should be adopted and stakeholders should keep to their own side of the bargain to avoid unnecessary delays.

  1. Social cost in construction projects

    International Nuclear Information System (INIS)

    Çelik, Tolga; Kamali, Saeed; Arayici, Yusuf

    2017-01-01

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  2. Social cost in construction projects

    Energy Technology Data Exchange (ETDEWEB)

    Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr [Department of Civil Engineering, Eastern Mediterranean University, Famagusta, T.R. North Cyprus, Via Mersin 10 (Turkey); Kamali, Saeed, E-mail: saeedkamali2002@gmail.com [Civil Engineering Department, Middle East Technical University, 06800 Ankara (Turkey); Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr [Department of Civil Engineering, Hasan Kalyoncu University, Gaziantep (Turkey)

    2017-05-15

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  3. PubChemQC Project: A Large-Scale First-Principles Electronic Structure Database for Data-Driven Chemistry.

    Science.gov (United States)

    Nakata, Maho; Shimazaki, Tomomi

    2017-06-26

    Large-scale molecular databases play an essential role in the investigation of various subjects such as the development of organic materials, in silico drug design, and data-driven studies with machine learning. We have developed a large-scale quantum chemistry database based on first-principles methods. Our database currently contains the ground-state electronic structures of 3 million molecules based on density functional theory (DFT) at the B3LYP/6-31G* level, and we successively calculated 10 low-lying excited states of over 2 million molecules via time-dependent DFT with the B3LYP functional and the 6-31+G* basis set. To select the molecules calculated in our project, we referred to the PubChem Project, which was used as the source of the molecular structures in short strings using the InChI and SMILES representations. Accordingly, we have named our quantum chemistry database project "PubChemQC" ( http://pubchemqc.riken.jp/ ) and placed it in the public domain. In this paper, we show the fundamental features of the PubChemQC database and discuss the techniques used to construct the data set for large-scale quantum chemistry calculations. We also present a machine learning approach to predict the electronic structure of molecules as an example to demonstrate the suitability of the large-scale quantum chemistry database.

  4. Time Overrun in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face huge amount of time overrun. This study assesses the causes of construction projects time overrun in Malaysia using structured questionnaire survey. Each respondent is asked to assign a one-to-five rating for each of the 18 time factors identified from literature review. Out of the 50 questionnaires sent out, 33 were received back representing 68% of the response rate. Data received from the questionnaires were analysed and processed using the descriptive statistics procedures. Findings from the study revealed that design and documentation issues, project management and contract administration, ineffective project planning and scheduling, contractor’s site management, financial resource management were the major factors that cause the time overrun. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.

  5. Construction project management handbook : September 2009.

    Science.gov (United States)

    2009-09-01

    The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies) undertaking substantial construction : projects, either for the first time or with little prior experience with construction project management. It pr...

  6. Construction of a bibliographic information database for the nuclear engineering

    International Nuclear Information System (INIS)

    Kim, Tae Whan; Lim, Yeon Soo; Kwac, Dong Chul

    1991-12-01

    The major goal of the project is to develop a nuclear science database of materials that have been published in Korea and to establish a network system that will give relevant information to people in the nuclear industry by linking this system with the proposed National Science Technical Information Network. This project aims to establish a database consisted of about 1,000 research reports that were prepared by KAERI from 1979 to 1990. The contents of the project are as follows: 1. Materials Selection and Collection 2. Index and Abstract Preparation 3. Data Input and Transmission. This project is intended to achieve the goal of maximum utilization of nuclear information in Korea. (Author)

  7. Solid Waste Projection Model: Database User's Guide

    International Nuclear Information System (INIS)

    Blackburn, C.L.

    1993-10-01

    The Solid Waste Projection Model (SWPM) system is an analytical tool developed by Pacific Northwest Laboratory (PNL) for Westinghouse Hanford Company (WHC) specifically to address Hanford solid waste management issues. This document is one of a set of documents supporting the SWPM system and providing instructions in the use and maintenance of SWPM components. This manual contains instructions for using Version 1.4 of the SWPM database: system requirements and preparation, entering and maintaining data, and performing routine database functions. This document supports only those operations which are specific to SWPM database menus and functions and does not Provide instruction in the use of Paradox, the database management system in which the SWPM database is established

  8. Qinshan CANDU project open top construction method

    International Nuclear Information System (INIS)

    Petrunik, K.J.; Wittann, K.; Khan, A.; Ricciuti, R.; Ivanov, A.; Chen, S.

    2003-01-01

    The significant schedule reductions achieved on the Qinshan CANDU Project were due in large part to the incorporation of advanced construction technologies in project design and delivery. For the Qinshan Project, a number of key advantages were realized through the use of the 'Open Top' construction method. This paper discusses the Qinshan Phase III CANDU Project Open Top implementation method. The Open Top method allowed major equipment to be installed simply, via the use of a Very Heavy Lift (VHL) crane and permitted the use of large-scale modularization. The advantages of Open Top construction, such as simplified access, more flexible project scheduling, improved construction safety and quality, and reduced labours are presented. The large-scale modularization of the Reactor Building Dousing System and the Open Top installation method and advantages relative to traditional CANDU 6 construction practices are also presented. Finally, major improvements for future CANDU plant construction using the Open Top method are discussed. (author)

  9. Pacific Northwest Salmon Habitat Project Database

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — In the Pacific Northwest Salmon Habitat Project Database Across the Pacific Northwest, both public and private agents are working to improve riverine habitat for a...

  10. Construction of a bibliographic information database for the nuclear science and engineering

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Tae Whan; Kim, Soon Ja; Choi, Kwang [Korea Atomic Energy Reasech Institute, Taejon (Korea)

    1997-12-01

    The major goal of this project is to construct a database in nuclear science and engineering information materials, support the R and D activities of users in this field, finally to support KRISTAL(Korea Research Information for Science and Technology Access Line)'s DB through the KREONet(Korea Research Environment Open Network), as one of the five national information networks. The contents of this project are as follows: (1) Materials selection and collection, (2) Indexing and abstract preparation, (3) Data input and transmission, and (4) document delivery service. In this seventh year, 45000 records, as total of inputted data, are added to the existing SATURN DB. These records are covered with the articles of nuclear-related core journals, proceedings, seminars, and research reports, etc. And using the Web, this project was important for users to get their needed information itself and to receive the materials of online requested information. And then it will give the chance users not only to promote the effectiveness of R and D activities, but also to obviate the duplicated research works. (author). 1 fig., 1 tab.

  11. Conjoint utility analysis of technical maturity and project progress of construction project

    Directory of Open Access Journals (Sweden)

    Ma Wei

    2016-01-01

    Full Text Available In this paper, taking construction project as the research object, the relationship between the project maturity index calculated by the construction project technical risks with different fine degree and the project progress index is studied, and the equilibrium relationship between the Party A’s utility curve and the Party B’s cost curve of using project maturity index and project progress index as the research variables is analyzed. The results show that, when the construction project technical risk division is more precise, the conjoint utility of the project's technical maturity index and the project progress is higher, and the project’s Party A and Party B two sides are closer to the optimal equilibrium. This shows that the construction project technical risk must be finely divided, and managed and controlled respectively, which will help to improve the conjoint utility of the project Party A and Party B two sides.

  12. [Construction of chemical information database based on optical structure recognition technique].

    Science.gov (United States)

    Lv, C Y; Li, M N; Zhang, L R; Liu, Z M

    2018-04-18

    To create a protocol that could be used to construct chemical information database from scientific literature quickly and automatically. Scientific literature, patents and technical reports from different chemical disciplines were collected and stored in PDF format as fundamental datasets. Chemical structures were transformed from published documents and images to machine-readable data by using the name conversion technology and optical structure recognition tool CLiDE. In the process of molecular structure information extraction, Markush structures were enumerated into well-defined monomer molecules by means of QueryTools in molecule editor ChemDraw. Document management software EndNote X8 was applied to acquire bibliographical references involving title, author, journal and year of publication. Text mining toolkit ChemDataExtractor was adopted to retrieve information that could be used to populate structured chemical database from figures, tables, and textual paragraphs. After this step, detailed manual revision and annotation were conducted in order to ensure the accuracy and completeness of the data. In addition to the literature data, computing simulation platform Pipeline Pilot 7.5 was utilized to calculate the physical and chemical properties and predict molecular attributes. Furthermore, open database ChEMBL was linked to fetch known bioactivities, such as indications and targets. After information extraction and data expansion, five separate metadata files were generated, including molecular structure data file, molecular information, bibliographical references, predictable attributes and known bioactivities. Canonical simplified molecular input line entry specification as primary key, metadata files were associated through common key nodes including molecular number and PDF number to construct an integrated chemical information database. A reasonable construction protocol of chemical information database was created successfully. A total of 174 research

  13. The Impact of Project Organizational Culture on the Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    Luong Hai Nguyen

    2017-05-01

    Full Text Available Cultural influence has recently received significant attention from academics due to its vital role in the success or failure of a project. In the construction industry, several empirical investigations have examined the influence of culture on project management. The aim of this study is to determine the impact of project organizational culture on the performance of construction projects. A total of 199 completed construction projects in Vietnam with specific data gathering through questionnaires were analyzed. The findings reveal that contractor commitment to contract agreements is the most significant cultural factor affecting project performance. Goal alignment and reliance, contractor commitment, and worker orientation (i.e., commitment to workers contribute to improved overall performance and participant satisfaction. Contractor commitment and cooperative orientation enhance labor productivity, whereas goal alignment and trust and contractor commitment ensure learning performance (i.e., learning from experience. The findings of this study may assist construction professionals in implementing practices that can contribute to the sustainability and success of construction projects.

  14. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  15. Radioactive materials in construction projects

    International Nuclear Information System (INIS)

    Herrmann, Ralf; Ohlendorf, Frank; Kaltz, Andrea Christine

    2014-01-01

    Till 1990 residues often of the former uranium mining were partly used as building material for road construction, terrain compensation and house construction in Saxony. These recommendations for action are addressed to applicants, planners and building constructors in the engineering and construction sector. It provides information for planning, preliminary investigations, applications, construction supervision related to radiation protection measures and documentation of construction projects where radioactive materials are expected.

  16. Development of a database system for near-future climate change projections under the Japanese National Project SI-CAT

    Science.gov (United States)

    Nakagawa, Y.; Kawahara, S.; Araki, F.; Matsuoka, D.; Ishikawa, Y.; Fujita, M.; Sugimoto, S.; Okada, Y.; Kawazoe, S.; Watanabe, S.; Ishii, M.; Mizuta, R.; Murata, A.; Kawase, H.

    2017-12-01

    Analyses of large ensemble data are quite useful in order to produce probabilistic effect projection of climate change. Ensemble data of "+2K future climate simulations" are currently produced by Japanese national project "Social Implementation Program on Climate Change Adaptation Technology (SI-CAT)" as a part of a database for Policy Decision making for Future climate change (d4PDF; Mizuta et al. 2016) produced by Program for Risk Information on Climate Change. Those data consist of global warming simulations and regional downscaling simulations. Considering that those data volumes are too large (a few petabyte) to download to a local computer of users, a user-friendly system is required to search and download data which satisfy requests of the users. We develop "a database system for near-future climate change projections" for providing functions to find necessary data for the users under SI-CAT. The database system for near-future climate change projections mainly consists of a relational database, a data download function and user interface. The relational database using PostgreSQL is a key function among them. Temporally and spatially compressed data are registered on the relational database. As a first step, we develop the relational database for precipitation, temperature and track data of typhoon according to requests by SI-CAT members. The data download function using Open-source Project for a Network Data Access Protocol (OPeNDAP) provides a function to download temporally and spatially extracted data based on search results obtained by the relational database. We also develop the web-based user interface for using the relational database and the data download function. A prototype of the database system for near-future climate change projections are currently in operational test on our local server. The database system for near-future climate change projections will be released on Data Integration and Analysis System Program (DIAS) in fiscal year 2017

  17. Effect of bond administration on construction project delivery

    Directory of Open Access Journals (Sweden)

    Oke Ayodeji Emmanuel

    2016-12-01

    Full Text Available Construction bond administration involves management of bond issues from inception of obtaining bond from guarantor to the point of release of contractor by the client. This process has posted a lot of challenges to construction stakeholders; it is therefore, necessary to examine the relationship between bond administration and project success. Archival data of completed bonded building projects were gathered through a pro forma developed for this purpose. Using Pearson product moment of correlation, it was revealed that the cost of securing a construction bond has a positive and significant effect on the initial and final costs of the project, while the number of days needed to secure a construction bond has no significant effect on the initial and final durations of the construction project. In order to establish the relationship between project delivery indices of cost and time and the construction bond administration variables, iteration of linear regression was adopted to arrive at the best-fit equation. Factors affecting the cost of securing construction bonds from guarantors should be identified and given adequate attention by construction stakeholders in order to minimize the effect of construction bond administration on project delivery.

  18. Application of value engineering technique in construction project

    International Nuclear Information System (INIS)

    Chen Changbing

    2003-01-01

    The author introduces how to apply the theories and methods of the value engineering in construction project. In the construction of a test device of the thermal hydrodynamic process, the authors have greatly reduced the construction cost and shortened the construction period by using the value engineering analyzing method. The application of value engineering in the project management is innovative. This practice indicates that the value engineering is important in many construction projects

  19. An examination of fuel consumption trends in construction projects

    International Nuclear Information System (INIS)

    Peters, Valerie A.; Manley, Dawn K.

    2012-01-01

    Recent estimates of fuel consumption in construction projects are highly variable. Lack of standards for reporting at both the equipment and project levels make it difficult to quantify the magnitude of fuel consumption and the associated opportunities for efficiency improvements in construction projects. In this study, we examined clusters of Environmental Impact Reports for seemingly similar construction projects in California. We observed that construction projects are not characterized consistently by task or equipment. We found wide variations in estimates for fuel use in terms of tasks, equipment, and overall projects, which may be attributed in part to inconsistencies in methodology and parameter ranges. Our analysis suggests that standardizing fuel consumption reporting and estimation methodologies for construction projects would enable quantification of opportunities for efficiency improvements at both the equipment and project levels. With increasing emphasis on reducing fossil fuel consumption, it will be important to quantify opportunities to increase fuel efficiency, including across the construction sector. - Highlights: ► An analysis of construction projects reveals inconsistencies in fuel use estimates. ► Fuel consumption estimates for similar construction equipment can vary greatly. ► Standards would help to quantify efficiency opportunities in construction.

  20. Environmental standards and project construction: A review

    International Nuclear Information System (INIS)

    Mason, P.F.; Thornberry, H.L.

    1991-01-01

    In the past decade, changes have occurred in the area of environmental regulation. This paper identifies the typical environmental standards applicable to project construction, recent environmental regulatory issues and trends, and identifies new environmental issues which must be considered in project construction. These include (1) handling hazardous chemicals in the workplace, (2) construction at formerly utilized sites, (3) disposal of debris, construction materials and hazardous waste, and (4) training and experience of construction personnel in environmental issues

  1. Solid Waste Projection Model: Database (Version 1.3)

    International Nuclear Information System (INIS)

    Blackburn, C.L.

    1991-11-01

    The Solid Waste Projection Model (SWPM) system is an analytical tool developed by Pacific Northwest Laboratory (PNL) for Westinghouse Hanford Company (WHC). The SWPM system provides a modeling and analysis environment that supports decisions in the process of evaluating various solid waste management alternatives. This document, one of a series describing the SWPM system, contains detailed information regarding the software and data structures utilized in developing the SWPM Version 1.3 Database. This document is intended for use by experienced database specialists and supports database maintenance, utility development, and database enhancement

  2. Exploring delay causes of road construction projects in

    Directory of Open Access Journals (Sweden)

    Remon F. Aziz

    2016-06-01

    Full Text Available Construction delays are a common phenomenon in civil engineering projects in Egypt including road construction projects. Therefore, it is essential to study and analyze causes of road construction delays. This paper studied a list of construction delay causes gathered from literature having different types of construction, different countries, different periods and different numbers of delay causes and delay groups. A questionnaire and personal interviews have formed the basis of this paper listing 293 delay causes. The questionnaire survey was distributed to 500 construction participants and 389 were received who represent consultants, contractors and site/design engineers excluding the owner representing the government in road projects as one party only. Relative Importance Index (RII is calculated and according to the highest values the top twenty and the least twenty delay causes of construction projects in Egypt are determined. A case study is analyzed and compared to the most important delay causes in the paper. The test results reveal good correlation of causes and groups between contractors and site/design engineers and between consultants and site design engineers and a somewhat low correlation between contractors and consultants. So there are no root causes that can be taking for granted to be most or least effective delay causes. Proposed model for predicting actual road construction project duration was developed; a real case study tested the accuracy of proposed model. According to the analysis of case study, the most contributing causes and groups to delays were discussed, and some future recommendations were proposed in order to control and minimize delays in road construction projects. These findings can be helpful for project managers to mitigate the road construction delays in Egypt. In order to effectively overcome the road construction delays in developing countries, suggestions are made for fundamental and large

  3. Linking Multiple Databases: Term Project Using "Sentences" DBMS.

    Science.gov (United States)

    King, Ronald S.; Rainwater, Stephen B.

    This paper describes a methodology for use in teaching an introductory Database Management System (DBMS) course. Students master basic database concepts through the use of a multiple component project implemented in both relational and associative data models. The associative data model is a new approach for designing multi-user, Web-enabled…

  4. Project Leadership and Quality Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    SPG Buba

    2017-05-01

    Full Text Available Background: The construction industry in Nigeria, is pigeonholed by poor quality of construction products as a result of the inherent corruption in the country. Lack of purposeful leadership and inappropriate choice of leadership styles in the industry have been attributed to project failure. Abandoned and failed projects are more predominant in the public sector which litters every corner of the country. Objectives: The objective of this paper is to assess the impact of leadership styles on quality performance criteria of public projects in Nigeria. Methodology: A total of 43 questionnaires were distributed to 3 key groups of respondents (Quantity Surveyors, Builders, and Architects who are project managers in Nigeria. Descriptive and Inferential statistics were used to analyse the data using the Statistical Package for Social Sciences (SPSS. Likert Scale was used to measure the independent variables (leadership style: facilitative, coaching, delegating and directing; and the level of achievement of projects based on the dependent variables (quality and function performance criteria which are: achieving highest aesthetic quality; and functional building that fits its purpose. Findings: The study revealed that Directing is the major leadership style used by project managers in Nigeria. Amongst the leadership styles which has the most impact on quality performance indicators is also directing which has the most relative influence on achieving highest aesthetic quality and functional building that fits its purpose. Conclusion/Recommendation/Way forward: The underlying relationship between Directing leadership styles and the performance criteria of achieving highest aesthetic quality and functional building that fits its purpose will be beneficial to the Nigerian construction environment.

  5. Construction of a bibliographic information database for the nuclear science and engineering (X)

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Tae Whan; Lee, Ji Ho; Oh, Jeong Hun; Choi, Kwang; Chun, Young Chun; Yoo, Jae Bok; Yu, Anna [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2000-12-01

    The major goal of this project is to construct a database in nuclear science and engineering information materials, support the R and D activities of users in this field, finally to support KRISTAL(Korea Research Information for Science and Technology Access Line)'s DB through the KREONet(Korea Research Environment Open Network), as one of the five national information networks.The contents of this project are as follows: 1) Materials selection and collection, 2) Indexing and abstract preparation, 3) Data input and transmission, and 4) document delivery service. In this Tenth year, 30,500 records ,as total of inputted data, are added to the existing SATURN DB. These records are covered with the articles of nuclear-related core journals, proceedings, seminars, and research reports, etc. And using the Web, this project was important for users to get their needed information itself and to receive the materials of online requested information . And then it will give the chance users not only to promote the effectiveness of R and D activities, but also to obviate the duplicated research works. 2 tabs. (Author)

  6. NOAA and MMS Marine Minerals Geochemical Database

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Marine Minerals Geochemical Database was created by NGDC as a part of a project to construct a comprehensive computerized bibliography and geochemical database...

  7. Leadership Quality for Malaysia Construction Leader to Steer a Success Construction Project

    Directory of Open Access Journals (Sweden)

    Ngah Nasaruddin Nur Ain

    2016-01-01

    Full Text Available Issues that dominate the construction industry for the long time such as time overrun, cost overrun, quality of construction and also safety during the construction process are difficult to resolve because of several factors involved which amongst them are leadership quality in the industry. Solving these issues can make the industry more sustainable in nature. This paper presents the need of leadership quality among construction parties involved to steer a construction project successfully. Literature work found that 11 leadership qualities to ensure construction project success. From the frequency analysis, five most dominant leadership qualities are team building, communication skill, visioning, planning & strategy skill, and decision making. Beside the literature, this study also seeks an opinion from a senior leader of a successful construction company regarding the need of these qualities amongst parties to resolve the construction issues. The results from an interview session indicate that he fully agreed with the need of all the qualities in the construction industry. This shows that there is a strong relationship between solving the issues with the leadership quality in ensuring construction project success. These qualities should be further investigated to acquire a better representation of leadership quality in resolving construction issues for Malaysia construction industry.

  8. Influential Factors Affecting Materials Management in Construction Projects

    Directory of Open Access Journals (Sweden)

    Jusoh Zairra Mat

    2017-12-01

    Full Text Available Construction projects are more often than not plagued by poor performances such as delays, cost overrun, low productivity, construction wastes and compromised quality. Amongst the critical contributory factors of poor project performances, is the ineffectiveness of materials management occurring in the construction sites. Indeed, materials management is a very important component for construction projects. However, there are only limited numbers of research available regarding this topic. Thus, this research focuses its study on materials management, specifically in identifying the influential factors that affect materials management in the construction project activities. Literatures from books, journal articles and conference papers related to poor project performances and materials management have been reviewed. Consequently, this study sorted the salient influential factors and categorized them based on their specific group. Out of 47 factors identified, they are classified into 8 groups. They are (1 site condition; (2 planning and handling on site; (3 management; (4 materials; (5 supplier and manufacturer default; (6 transportation; (7 contractual; and (8 governmental interferences. In conclusion, this study contends that by identifying the influential factors affecting materials management, it will help construction players to avoid the occurrence of those factors and will minimize the negative impacts on the overall performance of construction projects. Hence, the handling-over of project will be according to schedule and not delayed by materials mismanagement.

  9. GENISES: A GIS Database for the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Beckett, J.

    1991-01-01

    This paper provides a general description of the Geographic Nodal Information Study and Evaluation System (GENISES) database design. The GENISES database is the Geographic Information System (GIS) component of the Yucca Mountain Site Characterization Project Technical Database (TDB). The GENISES database has been developed and is maintained by EG ampersand G Energy Measurements, Inc., Las Vegas, NV (EG ampersand G/EM). As part of the Yucca Mountain Project (YMP) Site Characterization Technical Data Management System, GENISES provides a repository for geographically oriented technical data. The primary objective of the GENISES database is to support the Yucca Mountain Site Characterization Project with an effective tool for describing, analyzing, and archiving geo-referenced data. The database design provides the maximum efficiency in input/output, data analysis, data management and information display. This paper provides the systematic approach or plan for the GENISES database design and operation. The paper also discusses the techniques used for data normalization or the decomposition of complex data structures as they apply to GIS database. ARC/INFO and INGRES files are linked or joined by establishing ''relate'' fields through the common attribute names. Thus, through these keys, ARC can allow access to normalized INGRES files greatly reducing redundancy and the size of the database

  10. Livestock Anaerobic Digester Database

    Science.gov (United States)

    The Anaerobic Digester Database provides basic information about anaerobic digesters on livestock farms in the United States, organized in Excel spreadsheets. It includes projects that are under construction, operating, or shut down.

  11. Study on Big Database Construction and its Application of Sample Data Collected in CHINA'S First National Geographic Conditions Census Based on Remote Sensing Images

    Science.gov (United States)

    Cheng, T.; Zhou, X.; Jia, Y.; Yang, G.; Bai, J.

    2018-04-01

    In the project of China's First National Geographic Conditions Census, millions of sample data have been collected all over the country for interpreting land cover based on remote sensing images, the quantity of data files reaches more than 12,000,000 and has grown in the following project of National Geographic Conditions Monitoring. By now, using database such as Oracle for storing the big data is the most effective method. However, applicable method is more significant for sample data's management and application. This paper studies a database construction method which is based on relational database with distributed file system. The vector data and file data are saved in different physical location. The key issues and solution method are discussed. Based on this, it studies the application method of sample data and analyzes some kinds of using cases, which could lay the foundation for sample data's application. Particularly, sample data locating in Shaanxi province are selected for verifying the method. At the same time, it takes 10 first-level classes which defined in the land cover classification system for example, and analyzes the spatial distribution and density characteristics of all kinds of sample data. The results verify that the method of database construction which is based on relational database with distributed file system is very useful and applicative for sample data's searching, analyzing and promoted application. Furthermore, sample data collected in the project of China's First National Geographic Conditions Census could be useful in the earth observation and land cover's quality assessment.

  12. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  13. International shock-wave database project : report of the requirements workshop.

    Energy Technology Data Exchange (ETDEWEB)

    Aidun, John Bahram (Institute of Problems of chemical Physics of Russian Academy of Sciences); Lomonosov, Igor V. (Institute of Problems of chemical Physics of Russian Academy of Sciences); Levashov, Pavel R. (Joint Institute for High Temperatures of Russian Academy of Sciences)

    2012-03-01

    We report on the requirements workshop for a new project, the International Shock-Wave database (ISWdb), which was held October 31 - November 2, 2011, at GSI, Darmstadt, Germany. Participants considered the idea of this database, its structure, technical requirements, content, and principles of operation. This report presents the consensus conclusions from the workshop, key discussion points, and the goals and plan for near-term and intermediate-term development of the ISWdb. The main points of consensus from the workshop were: (1) This international database is of interest and of practical use for the shock-wave and high pressure physics communities; (2) Intermediate state information and off-Hugoniot information is important and should be included in ISWdb; (3) Other relevant high pressure and auxiliary data should be included to the database, in the future; (4) Information on the ISWdb needs to be communicated, broadly, to the research community; and (5) Operating structure will consist of an Advisory Board, subject-matter expert Moderators to vet submitted data, and the database Project Team. This brief report is intended to inform the shock-wave research community and interested funding agencies about the project, as its success, ultimately, depends on both of these groups finding sufficient value in the database to use it, contribute to it, and support it.

  14. Educator Sexual Misconduct and Texas Educator Discipline Database Construction.

    Science.gov (United States)

    Robert, Catherine E; Thompson, David P

    2018-05-24

    The purpose of this research is to describe Texas educator sexual misconduct (ESM) by examining 8 years of sanctions issued to educators (N = 1415) for either sexual misconduct or inappropriate relationships with students or minors. We first examine Texas ESM from the perspective of quality database construction and then describe the demographic characteristics of educators sanctioned for ESM between 2008 and 2016. Differences in the demographic characteristics of educators sanctioned for ESM vary according to the definition of ESM employed by the state education agency. Younger and early career educators are more likely to engage in inappropriate relationships with students or minors, whereas older and later-career teachers are more likely to engage in sexual misconduct as that term is defined by the state education agency. Over one-third of educators sanctioned for ESM were either new to the profession or new to their school district when sanctioned. Recommendations are offered for database construction, policy, and practice.

  15. Risk management in public sector construction projects: Case ...

    African Journals Online (AJOL)

    a project environment. Since projects are complicated, experience ... work, delays trigger cost overruns in construction projects (African. Development Bank ..... quantity surveying, contract management, and engineering. Table 4: Research ..... professionals at the business and operational levels of construction management.

  16. Exploitation and Benefits of BIM in Construction Project Management

    Science.gov (United States)

    Mesároš, Peter; Mandičák, Tomáš

    2017-10-01

    BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.

  17. Benchmarking Sustainability Practices Use throughout Industrial Construction Project Delivery

    Directory of Open Access Journals (Sweden)

    Sungmin Yun

    2017-06-01

    Full Text Available Despite the efforts for sustainability studies in building and infrastructure construction, the sustainability issues in industrial construction remain understudied. Further, few studies evaluate sustainability and benchmark sustainability issues in industrial construction from a management perspective. This study presents a phase-based benchmarking framework for evaluating sustainability practices use focusing on industrial facilities project. Based on the framework, this study quantifies and assesses sustainability practices use, and further sorts the results by project phase and major project characteristics, including project type, project nature, and project delivery method. The results show that sustainability practices were implemented higher in the construction and startup phases relative to other phases, with a very broad range. An assessment by project type and project nature showed significant differences in sustainability practices use, but no significant difference in practices use by project delivery method. This study contributes to providing a benchmarking method for sustainability practices in industrial facilities projects at the project phase level. This study also discusses and provides an application of phase-based benchmarking for sustainability in industrial construction.

  18. Methodology of project management at implementation of projects of high-rise construction

    Science.gov (United States)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  19. Construction Project Leadership from the Perspective of Islam

    OpenAIRE

    MUHAMAD ROSDI SENAM; KHAIRUDDIN ABDUL RASHID; AZILA AHMAD SARKAWI; RAPIAH MOHD. ZAINI

    2014-01-01

    Construction industry is continuously being accused with common issues such as low performance, corruptions, spillages, bad practices in addition to common project failures despite advances in project management tools and techniques. This further adds to the existing and increasing complex and multi-facets business environment in construction projects that has resulted in the increasing pressure and challenges faced by project leaders and project managers today. Researchers in project managem...

  20. The Ensembl genome database project.

    Science.gov (United States)

    Hubbard, T; Barker, D; Birney, E; Cameron, G; Chen, Y; Clark, L; Cox, T; Cuff, J; Curwen, V; Down, T; Durbin, R; Eyras, E; Gilbert, J; Hammond, M; Huminiecki, L; Kasprzyk, A; Lehvaslaiho, H; Lijnzaad, P; Melsopp, C; Mongin, E; Pettett, R; Pocock, M; Potter, S; Rust, A; Schmidt, E; Searle, S; Slater, G; Smith, J; Spooner, W; Stabenau, A; Stalker, J; Stupka, E; Ureta-Vidal, A; Vastrik, I; Clamp, M

    2002-01-01

    The Ensembl (http://www.ensembl.org/) database project provides a bioinformatics framework to organise biology around the sequences of large genomes. It is a comprehensive source of stable automatic annotation of the human genome sequence, with confirmed gene predictions that have been integrated with external data sources, and is available as either an interactive web site or as flat files. It is also an open source software engineering project to develop a portable system able to handle very large genomes and associated requirements from sequence analysis to data storage and visualisation. The Ensembl site is one of the leading sources of human genome sequence annotation and provided much of the analysis for publication by the international human genome project of the draft genome. The Ensembl system is being installed around the world in both companies and academic sites on machines ranging from supercomputers to laptops.

  1. FJET Database Project: Extract, Transform, and Load

    Science.gov (United States)

    Samms, Kevin O.

    2015-01-01

    The Data Mining & Knowledge Management team at Kennedy Space Center is providing data management services to the Frangible Joint Empirical Test (FJET) project at Langley Research Center (LARC). FJET is a project under the NASA Engineering and Safety Center (NESC). The purpose of FJET is to conduct an assessment of mild detonating fuse (MDF) frangible joints (FJs) for human spacecraft separation tasks in support of the NASA Commercial Crew Program. The Data Mining & Knowledge Management team has been tasked with creating and managing a database for the efficient storage and retrieval of FJET test data. This paper details the Extract, Transform, and Load (ETL) process as it is related to gathering FJET test data into a Microsoft SQL relational database, and making that data available to the data users. Lessons learned, procedures implemented, and programming code samples are discussed to help detail the learning experienced as the Data Mining & Knowledge Management team adapted to changing requirements and new technology while maintaining flexibility of design in various aspects of the data management project.

  2. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  3. An analysis of extended entity relationship constructs extraction in database reverse engineering approaches

    International Nuclear Information System (INIS)

    Jilani, M.A.; Aziz, A.; Hussain, T.

    2008-01-01

    Database reverse Engineering is technique used for transforming relational schema into a conceptual schema for finding and fixing design flaw for maintaining and re-engineering database systems for the integration of database system with another and migration of a database system from one platform to another. We studied the approaches from year 1993 to 2006 to find out which EER construct cannot be retrieved by most of the DBRE approaches so that they can be retrieved in the future. For each EER construct that can be retrieved by using a given DBRE approach. We show whether they are retrieved without user involvement (automatically). Partial user involvement (semi-automatically) or full user involvement (manually). We also discuss the relevant advantages and limitations of each DBRE technique considered in this paper. (author)

  4. Technology Management on Large Construction Projects

    DEFF Research Database (Denmark)

    Bonke, Sten

    The aim of this text is to discuss and to develop the concept of technology management in relation to the empirical field of construction projects. In the first of the two main sections central theories and their derived assertions concerning technology management criteria are summed up...... Fixed Link construction project. Finally on this basis the concluding remarks are pointing to the main theoretical problems and their practical implementations for the introduction of a technology management discipline in construction....... in a schematic theoretical framework. Hereafter the general characteristics of construction are examined from the point of view of serving as an empirical field for technology management analysis. In the second section the technology management theme is associated with the empirical properties of the Great Belt...

  5. Bi-project management in engineering complex industrial construction projects

    NARCIS (Netherlands)

    Velde, Robert R. van der; Donk, Dirk Pieter van

    2000-01-01

    Engineering large industrial construction projects is usually a complex task with several co-operating actors. This paper investigates such projects, characterised by two main actors: the owner of the installation (the client organisation) responsible for the engineering of the production process,

  6. Thermodynamics of Advanced Fuels - International Database Project

    International Nuclear Information System (INIS)

    Massara, Simone; Gueneau, Christine

    2014-01-01

    The Thermodynamics of Advanced Fuels - International Database (TAF-ID) Project was established in 2013 under the auspices of the NEA Nuclear Science Committee. The project was designed to make available a comprehensive, internationally recognised and quality-assured database of phase diagrams and thermodynamic properties of advanced nuclear fuels with a view to meeting specialised requirements for the development of advanced fuels for a future generation of nuclear reactors. Some of the specific technical objectives that this programme intends to achieve are to predict the solid, liquid and/or gas phases formed during fuel cladding chemical interactions under normal and accident conditions, to improve the control of the experimental conditions during the fabrication of fuel materials at high temperature, for example by predicting the vapour pressures of the elements (particularly of plutonium and the minor actinides) and to predict the evolution of the chemical composition of fuel under irradiation versus temperature and burn-up. This joint project, co-ordinated by the NEA, was established for an initial three-year period among nine organisations from six NEA member countries: Canada (AECL, RMCC, UOIT), France (CEA), Japan (JAEA, CRIEPI), the Netherlands (NRG), the Republic of Korea (KAERI) and the United States (US DOE). It is entirely funded by the nine signatories of the project. (authors)

  7. Optimizing strategy for repetitive construction projects within multi-mode resources

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Estimating tender data for specific project is the most essential part in construction areas as of a contractor’s view such as: proposed project duration with corresponding gross value and cash flows. Cash flow analysis of construction projects has a long history and has been an important topic in construction management. Determination of project cash flows is very sensitive, especially for repetitive construction projects. This paper focuses on how to calculate tender data for repetitive construction projects such as: project duration, project cost, project/bid price, project cash flows, project maximum working capital and project net present value that is equivalent to net profit at the beginning of the project. A simplified multi-objective optimization formulation will be presented that creates best tender data to contractor comparing with more feasible options that are generated from multi-mode resources in a given project. This mathematical formulation is intended to give more scenarios which provide a practical support for typical construction contractors who need to optimize resource utilization in order to minimize project duration, project/bid price and project maximum working capital while maximizing its net present value simultaneously. At the end of the paper, an illustrative example will be presented to demonstrate the applications of proposed technique to an optimization expressway of repetitive construction project.

  8. TIPTOPbase: the Iron Project and the Opacity Project Atomic Database

    Science.gov (United States)

    Mendoza, Claudio; Nahar, Sultana; Pradhan, Anil; Seaton, Micheal; Zeippen, Claude

    2001-05-01

    The Opacity Project, the IRON Project, and the RmaX Network (The Opacity Project Team, Vol.1,2), IOPP, Bristol (1995,1996); Hummer et al., Astron. Astrophys. 279, 298 (1993) are international computational efforts concerned with the production of high quality atomic data for astrophysical applications. Research groups from Canada, France, Germany, UK, USA and Venezuela are involved. Extensive data sets containing accurate energy levels, f-values, A-values, photoionisation cross sections, collision strengths, recombination rates, and opacitites have been computed for cosmically abundant elements using state-of-the-art atomic physics codes. Their volume, completeness and overall accuracy are presently unmatched in the field of laboratory astrophysics. Some of the data sets have been available since 1993 from a public on-line database service referred to as TOPbase (Cunto et al Astron. Astrophys. 275), L5 (1993), ( http://cdsweb.u-strasbg.fr/OP.html at CDS France, and http://heasarc.gsfc.nasa.gov/topbase, at NSAS USA). We are currently involved in a major effort to scale the existing database services to develop a robust platform for the high-profile dissemination of atomic data to the scientific community within the next 12 months. (Partial support from the NSF and NASA is acknowledged.)

  9. Factors influencing cost over-run in Indian construction projects

    Directory of Open Access Journals (Sweden)

    Cindrela Devi A.

    2017-01-01

    Full Text Available Construction cost is the most important criteria of project success and hence the construction project performance is generally expressed in terms of cost and its variance from the budget. In spite of having extant literature, cost estimation methods, cost indices etc., construction projects rarely meet the budgeted cost. This research study focuses on the construction cost overrun and to identify the various factors that affects the construction cost performance. Based on an extensive literature review and input from industry experts, sixty eight factors that causes cost overrun were identified for investigation. Further, a structured questionnaire survey was conducted among the industry experts and the collected data has been analysed statistically. It is concluded that the factors namely scope creep, construction delays, rework and practise of awarding the contract to the lowest bidder are most significant factors for construction cost overrun in non-infrastructural Indian projects. The relative importance of the listed factors used to guide the project team in addressing the cost related risks involved in the projects. The findings are expected to bridge the gap in the current construction cost management practices.

  10. Informal worker phenomenon in housing construction project

    Science.gov (United States)

    Wijayaningtyas, Maranatha; Sipan, Ibrahim; Lukiyanto, Kukuh

    2017-11-01

    The informal workers phenomenon on housing construction projects in Indonesia is different from workers in other sectors who would always request as permanent employees. Substantively, the informal workers are disinclined to be bound as permanent employees which different from the general labor paradigm. Hence, the objective of this study is to find out how the labour selection process, the factors that affected their performance, and the suitable wage system to achieve the target completion of housing construction project. The qualitative method is used to uncover and understand the meaning behind the phenomena (numina) of informal workers action and their influence on housing construction project which called phenomenological approach. Five informal workers and two project managers were selected as informants based on predetermined criteria with in-depth interviews. The results showed that the informal worker were more satisfied with the wage based on unit price while working in the housing construction project for the flexibility in working hours. In addition, the developer was also relieved because they only control the quality and the achievement of the project completion time which supported by informal worker leader. Therefore, these findings are beneficial for both of developer and government as policy maker to succeed the housing program in Indonesia.

  11. Construction Project Leadership from the Perspective of Islam

    Directory of Open Access Journals (Sweden)

    MUHAMAD ROSDI SENAM

    2014-12-01

    Full Text Available Construction industry is continuously being accused with common issues such as low performance, corruptions, spillages, bad practices in addition to common project failures despite advances in project management tools and techniques. This further adds to the existing and increasing complex and multi-facets business environment in construction projects that has resulted in the increasing pressure and challenges faced by project leaders and project managers today. Researchers in project management literature calls for more project leadership research as leadership now is increasingly recognised as project success factor. Ethical dilemma and leadership crisis facing the project managers and business organisations reveals the shortcomings and inadequacies of the conventional non-Islamic leadership that is believed to be or that has not fully considered the religious, spiritual, moral and ethical dimensions. Examples of these theories of leadership are authentic leadership, servant leadership and ethical leadership. Therefore, recent trend from literature has implicitly suggested a new form of leadership for construction project manager which is spiritual, moral, values and ethical form of leadership. The uniqueness of Islam is that it does not separate religion and other aspects of human life activities. Construction and project activities are part of the whole economic and social transactions of a nation and thus it is part of Islam. Project management in particular leadership awaits divine intervention that is tied to God consciousness and accords with values and principles prescribed in the Quran and Sunnah. This research is intended to overcome the spiritual and religious shortcomings of the present leadership models by proposing an Islamic perspective of leadership for construction project manager.

  12. Construction of a bibliographic information database for the Nuclear Science and Engineering (IX)

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Tae Whan; Oh, Jeong Hun; Choi, Kwang; Keum, Jong Yong [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-12-01

    The major goal of this project is to construct a database in nuclear science and engineering information materials, support the R and D activities of users in this field, finally to support KRISTAL(Korea Research Information for Science and Technology Access Line)'s DB through the KREONet(Korea Research Environment Open Network), as one of the five national information networks. The contents of this project are as follows: 1) Materials selection and collection, 2) Indexing and abstract preparation, 3) Data input and transmission, and 4) document delivery service. In this seventh year, 40,000 records, as total of inputted data, are added to the existing SATURN DB. These records are covered with the articles of nuclear-related core journals, proceedings, seminars, and research reports, etc. And using the Web, this project was important for users to get their needed information itself and to receive the materials of online requested information. And then it will give the chance users not only to promote the the effectiveness of R and D activities, but also to obviate the duplicated research works. 1 fig., 1 tab. (Author)

  13. Construction of a bibliographic information database for the nuclear science and engineering (VIII)

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Tae Whan; Kim, Soon Ja; Kim, Young Min; Oh, Jeong Hun; Choi, Kwang [Korea Atomic Energy Research Institute, Taejon (Korea)

    1998-12-01

    The major goal of this project is to construct a database in nuclear science and engineering information materials, support the R and D activities of users in this field, finally to support KRISTAL(Korea Research Information for Science ad Technology Access Line)'s BD through the KREONet (Korea Research Environment Open Network), as one of the five national information networks. The contents of this project are as follows : 1) Materials selection and collection, 2) Indexing and abstract preparation, 3) Data input and transmission, and 4) document delivery service. In this seventh year, 35,000 record as total of inputted data, are added to the existing SATURN DB using the input system. These records are covered with the articles of nuclear-related core journals, proceedings, seminars, and research reports, etc. And using the Web, this project was important for users to get their needed information itself and to receive the materials of online requested information. And then it will give the chance users not only to promote the effectiveness of R and D activities, but also to obviate the duplicated research works. 1 tab. (Author)

  14. Analyzing delay causes in Egyptian construction projects

    Directory of Open Access Journals (Sweden)

    Mohamed M. Marzouk

    2014-01-01

    Full Text Available Construction delays are common problems in civil engineering projects in Egypt. These problems occur frequently during project life-time leading to disputes and litigation. Therefore, it is essential to study and analyze causes of construction delays. This research presents a list of construction delay causes retrieved from literature. The feedback of construction experts was obtained through interviews. Subsequently, a questionnaire survey was prepared. The questionnaire survey was distributed to thirty-three construction experts who represent owners, consultants, and contractor’s organizations. Frequency Index, Severity Index, and Importance Index are calculated and according to the highest values of them the top ten delay causes of construction projects in Egypt are determined. A case study is analyzed and compared to the most important delay causes in the research. Statistical analysis is carried out using analysis of variance ANOVA method to test delay causes, obtained from the survey. The test results reveal good correlation between groups while there is significant difference between them for some delay causes and finally roadmap for prioritizing delay causes groups is presented.

  15. Construction of crystal structure prototype database: methods and applications.

    Science.gov (United States)

    Su, Chuanxun; Lv, Jian; Li, Quan; Wang, Hui; Zhang, Lijun; Wang, Yanchao; Ma, Yanming

    2017-04-26

    Crystal structure prototype data have become a useful source of information for materials discovery in the fields of crystallography, chemistry, physics, and materials science. This work reports the development of a robust and efficient method for assessing the similarity of structures on the basis of their interatomic distances. Using this method, we proposed a simple and unambiguous definition of crystal structure prototype based on hierarchical clustering theory, and constructed the crystal structure prototype database (CSPD) by filtering the known crystallographic structures in a database. With similar method, a program structure prototype analysis package (SPAP) was developed to remove similar structures in CALYPSO prediction results and extract predicted low energy structures for a separate theoretical structure database. A series of statistics describing the distribution of crystal structure prototypes in the CSPD was compiled to provide an important insight for structure prediction and high-throughput calculations. Illustrative examples of the application of the proposed database are given, including the generation of initial structures for structure prediction and determination of the prototype structure in databases. These examples demonstrate the CSPD to be a generally applicable and useful tool for materials discovery.

  16. Construction of crystal structure prototype database: methods and applications

    International Nuclear Information System (INIS)

    Su, Chuanxun; Lv, Jian; Wang, Hui; Wang, Yanchao; Ma, Yanming; Li, Quan; Zhang, Lijun

    2017-01-01

    Crystal structure prototype data have become a useful source of information for materials discovery in the fields of crystallography, chemistry, physics, and materials science. This work reports the development of a robust and efficient method for assessing the similarity of structures on the basis of their interatomic distances. Using this method, we proposed a simple and unambiguous definition of crystal structure prototype based on hierarchical clustering theory, and constructed the crystal structure prototype database (CSPD) by filtering the known crystallographic structures in a database. With similar method, a program structure prototype analysis package (SPAP) was developed to remove similar structures in CALYPSO prediction results and extract predicted low energy structures for a separate theoretical structure database. A series of statistics describing the distribution of crystal structure prototypes in the CSPD was compiled to provide an important insight for structure prediction and high-throughput calculations. Illustrative examples of the application of the proposed database are given, including the generation of initial structures for structure prediction and determination of the prototype structure in databases. These examples demonstrate the CSPD to be a generally applicable and useful tool for materials discovery. (paper)

  17. MULTIPLE PROJECT MANAGEMENT IN THE CONSTRUCTION INDSUTRY

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-06-01

    Full Text Available The field of project management has historically focused on the administration of one project at a time, a focus that is insufficient given the growing need for organizations to manage multiple projects simultaneously. The requirements of Multiple Project Management (MPM involves demands and practices that are different from those of single projects. MPM poses a special need for coordination of shared resources across multiple projects in a way that can maintain the firm’s strategic focus and facilitate effective decision making. The construction industry is noteworthy for its frequent need for the management of multiple projects. This paper offers a review of the last five years of indexed literature related to multiple project management in the construction industry, identifies gaps and suggests promising new avenues of inquiry.

  18. The Danish (Q)SAR Database Update Project

    DEFF Research Database (Denmark)

    Nikolov, Nikolai Georgiev; Dybdahl, Marianne; Abildgaard Rosenberg, Sine

    2013-01-01

    The Danish (Q)SAR Database is a collection of predictions from quantitative structure–activity relationship ((Q)SAR) models for over 70 environmental and human health-related endpoints (covering biodegradation, metabolism, allergy, irritation, endocrine disruption, teratogenicity, mutagenicity......, carcinogenicity and others), each of them available for 185,000 organic substances. The database has been available online since 2005 (http://qsar.food.dtu.dk). A major update project for the Danish (Q)SAR database is under way, with a new online release planned in the beginning of 2015. The updated version...... will contain more than 600,000 discrete organic structures and new, more precise predictions for all endpoints, derived by consensus algorithms from a number of state-of-the-art individual predictions. Copyright © 2013 Published by Elsevier Ireland Ltd....

  19. The construction project manager in South Africa: Analysis of ...

    African Journals Online (AJOL)

    Journal Home > Vol 22, No 1 (2015) > ... Construction project managers in the built environment come from various backgrounds and knowledge bases; therefore, the project managers' project ... Industry-specific guidelines for construction project management (PMBOK and SACPCMP) were obtained and analysed.

  20. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  1. Oil and gas field database

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young In; Han, Jung Kuy [Korea Institute of Geology Mining and Materials, Taejon (Korea)

    1998-12-01

    As agreed by the Second Meeting of the Expert Group of Minerals and Energy Exploration and Development in Seoul, Korea, 'The Construction of Database on the Oil and Gas Fields in the APEC Region' is now under way as a GEMEED database project for 1998. This project is supported by Korean government funds and the cooperation of GEMEED colleagues and experts. During this year, we have constructed the home page menu (topics) and added the data items on the oil and gas field. These items include name of field, discovery year, depth, the number of wells, average production (b/d), cumulative production, and API gravity. The web site shows the total number of oil and gas fields in the APEC region is 47,201. The number of oil and gas fields by member economics are shown in the table. World oil and gas statistics including reserve, production consumption, and trade information were added to the database for the users convenience. (author). 13 refs., tabs., figs.

  2. Oil and gas field database

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young In; Han, Jung Kuy [Korea Institute of Geology Mining and Materials, Taejon (Korea)

    1998-12-01

    As agreed by the Second Meeting of the Expert Group of Minerals and Energy Exploration and Development in Seoul, Korea, 'The Construction of Database on the Oil and Gas Fields in the APEC Region' is now under way as a GEMEED database project for 1998. This project is supported by Korean government funds and the cooperation of GEMEED colleagues and experts. During this year, we have constructed the home page menu (topics) and added the data items on the oil and gas field. These items include name of field, discovery year, depth, the number of wells, average production (b/d), cumulative production, and API gravity. The web site shows the total number of oil and gas fields in the APEC region is 47,201. The number of oil and gas fields by member economics are shown in the table. World oil and gas statistics including reserve, production consumption, and trade information were added to the database for the users convenience. (author). 13 refs., tabs., figs.

  3. Nuclear Criticality Technology and Safety Project parameter study database

    International Nuclear Information System (INIS)

    Toffer, H.; Erickson, D.G.; Samuel, T.J.; Pearson, J.S.

    1993-03-01

    A computerized, knowledge-screened, comprehensive database of the nuclear criticality safety documentation has been assembled as part of the Nuclear Criticality Technology and Safety (NCTS) Project. The database is focused on nuclear criticality parameter studies. The database has been computerized using dBASE III Plus and can be used on a personal computer or a workstation. More than 1300 documents have been reviewed by nuclear criticality specialists over the last 5 years to produce over 800 database entries. Nuclear criticality specialists will be able to access the database and retrieve information about topical parameter studies, authors, and chronology. The database places the accumulated knowledge in the nuclear criticality area over the last 50 years at the fingertips of a criticality analyst

  4. Multi-objective genetic optimization of linear construction projects

    Directory of Open Access Journals (Sweden)

    Fatma A. Agrama

    2012-08-01

    Full Text Available In the real world, the majority cases of optimization problems, met by engineers, are composed of several conflicting objectives. This paper presents an approach for a multi-objective optimization model for scheduling linear construction projects. Linear construction projects have many identical units wherein activities repeat from one unit to another. Highway, pipeline, and tunnels are good examples that exhibit repetitive characteristics. These projects represent a large portion of the construction industry. The present model enables construction planners to generate optimal/near-optimal construction plans that minimize project duration, total work interruptions, and total number of crews. Each of these plans identifies, from a set of feasible alternatives, optimal crew synchronization for each activity and activity interruptions at each unit. This model satisfies the following aspects: (1 it is based on the line of balance technique; (2 it considers non-serial typical activities networks with finish–start relationship and both lag or overlap time between activities is allowed; (3 it utilizes a multi-objective genetic algorithms approach; (4 it is developed as a spreadsheet template that is easy to use. Details of the model with visual charts are presented. An application example is analyzed to illustrate the use of the model and demonstrate its capabilities in optimizing the scheduling of linear construction projects.

  5. Appendix VI: KHNP staffing plan of construction site office: ULCHIN 5 and 6 construction project (ROK)

    International Nuclear Information System (INIS)

    2008-01-01

    KHNP, as an owner/operator organization, is responsible for all project activities including design, procurement, construction, and commissioning, for Korea's nuclear power plant (NPP) construction projects. Four separate functional offices of KHNP are set up to complete the construction management work. These offices are (1) home office, (2) field construction office, (3) field quality assurance office, and (4) field startup/commissioning office. This paper presents a staffing plan for the field construction office starting initial project implementation to final turnover to operations stages. It is recognized that the plan may not be applicable to other utility situations in terms of project management of site activity depending upon how the overall project contract is structured

  6. The application of micro UAV in construction project

    Science.gov (United States)

    Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura

    2017-10-01

    In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.

  7. Database for the OECD-IAEA Paks Fuel Project

    International Nuclear Information System (INIS)

    Szabo, Emese; Hozer, Zoltan; Gyori, Csaba; Hegyi, Gyoergy

    2010-01-01

    On 10 April 2003 severe damage of fuel assemblies took place during an incident at Unit 2 of Paks Nuclear Power Plant in Hungary. The assemblies were being cleaned in a special tank below the water level of the spent fuel storage pool in order to remove crud buildup. That afternoon, the chemical cleaning of assemblies was completed and the fuel rods were being cooled by circulation of storage pool water. The first sign of fuel failure was the detection of some fission gases released from the cleaning tank during that evening. The cleaning tank cover locks were released after midnight and this operation was followed by a sudden increase in activity concentrations. The visual inspection revealed that all 30 fuel assemblies were severely damaged. The first evaluation of the event showed that the severe fuel damage happened due to inadequate coolant circulation within the cleaning tank. The damaged fuel assemblies will be removed from the cleaning tank in 2005 and will be stored in special canisters in the spent fuel storage pool of the Paks NPP. Following several discussions between expert from different countries and international organisations the OECD-IAEA Paks Fuel Project was proposed. The project is envisaged in two phases. - Phase 1 is to cover organization of visual inspection of material, preparation of database, performance of analyses and preparatory work for fuel examination. - Phase 2 is to cover the fuel transport and the hot cell examination. The first meeting of the project was held in Budapest on 30-31 January 2006. Phase 1 of the Paks Fuel Project will focus on the numerical simulation of the most important aspects of the incident. This activity will help in the reconstruction of the accidental scenario. The first step of Phase 1 was the collection of a database necessary for the code calculations. The main objective of database collection was to provide input data for calculations. For this reason the collection was focused on such data that are

  8. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  9. Database requirements for the Advanced Test Accelerator project

    International Nuclear Information System (INIS)

    Chambers, F.W.

    1984-01-01

    The database requirements for the Advanced Test Accelerator (ATA) project are outlined. ATA is a state-of-the-art electron accelerator capable of producing energetic (50 million electron volt), high current (10,000 ampere), short pulse (70 billionths of a second) beams of electrons for a wide variety of applications. Databasing is required for two applications. First, the description of the configuration of facility itself requires an extended database. Second, experimental data gathered from the facility must be organized and managed to insure its full utilization. The two applications are intimately related since the acquisition and analysis of experimental data requires knowledge of the system configuration. This report reviews the needs of the ATA program and current implementation, intentions, and desires. These database applications have several unique aspects which are of interest and will be highlighted. The features desired in an ultimate database system are outlined. 3 references, 5 figures

  10. Flow Accelerated Corrosion: Effect of Water Chemistry and Database Construction

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Eun Hee; Kim, Kyung Mo; Lee, Gyeong Geun; Kim, Dong Jin [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    Flow accelerated corrosion (FAC) of carbon steel piping in pressurized water reactors (PWRs) has been a major issue in nuclear industry. Severe accidents at Surry Unit 2 in 1986 and Mihama Unit 3 in 2004 initiated the world wide interest in this area. FAC is a dissolution process of the protective oxide layer on carbon steel or low-alloy steel when these parts are exposed to flowing water (single-phase) or wet steam (two-phase). In a single-phase flow, a scalloped, wavy, or orange peel and in a two-phase flow, tiger striping is observed, respectively. FAC is affected by many parameters, like material composition, pH, dissolved oxygen (DO), flow velocity, system pressure, and steam quality. This paper describes the water chemistry factors influencing on FAC and the database is then constructed using literature data. In order to minimize FAC in NPPs, the optimal method is to control water chemistry parameters. However, quantitative data about FAC have not been published for proprietary reason even though qualitative behaviors of FAC have been well understood. A database was constructed using experimental data in literature. Accurate statistical analysis will be performed using this database to identify the relationship between the FAC rate and test environment.

  11. Implementation of lean construction techniques for minimizing the risks effect on project construction time

    Directory of Open Access Journals (Sweden)

    Usama Hamed Issa

    2013-12-01

    Full Text Available The construction projects involve various risk factors which have various impacts on time objective that may lead to time-overrun. This study suggests and applies a new technique for minimizing risk factors effect on time using lean construction principles. The lean construction is implemented in this study using the last planner system through execution of an industrial project in Egypt. Evaluating the effect of using the new tool is described in terms of two measurements: Percent Expected Time-overrun (PET and Percent Plan Completed (PPC. The most important risk factors are identified and assessed, while PET is quantified at the project start and during the project execution using a model for time-overrun quantification. The results showed that total project time is reduced by 15.57% due to decreasing PET values, while PPC values improved. This is due to minimizing and mitigating the effect of most of the risk factors in this project due to implementing lean construction techniques. The results proved that the quantification model is suitable for evaluating the effect of using lean construction techniques. In addition, the results showed that average value of PET due to factors affected by lean techniques represents 67% from PET values due to all minimized risk factors.

  12. A Framework for Coordination Process into Construction Projects

    Directory of Open Access Journals (Sweden)

    Alaloul Wesam S.

    2016-01-01

    Full Text Available Construction industry is recognized as high fragmentation, low efficiency, cost and time overruns in contrast with other industries. These peculiarities are the main roots of poor performance facing by the industry. Effective coordination is vital in construction projects success and mitigate the fragmentation dilemma, however it is often difficult to achieve and need iterative process. Coordination is core issue to improve performance in construction project. Relevant studies have addressed the coordination process importance and implementation, but not in a framework. This paper propose a framework for coordination process in construction projects, as well as its relationship with performance. The objective of the framework is to provide a roadmap for the construction parties to realize operational excellence so that collectively stakeholders can recognize the effect of coordination process application on the project performance. The data were obtained from literature review and structured interviews with five experts. The analysis produced the framework of coordination based on the extensively used procedures for information and data flow between stakeholders.

  13. Construction Management of Electromechanical Engineering Project in Petrochemical Construction

    Directory of Open Access Journals (Sweden)

    Xi Tao

    2017-03-01

    Full Text Available Petrochemical industry as a basic industry, occupies a pivotal position in the national economy, with the continuous development of science and technology, electromechanical automation in the petrochemical industry has been widely used to save a lot of labor but also greatly improve the oil Chemical industry production efficiency. Therefore, in the construction of petrochemical industry, mechanical and electrical engineering as part of it. It plays a vital role. Petrochemical industry with the production of high temperature and high pressure and flammable and explosive gas, can strengthen the construction of mechanical and electrical engineering specialization and construction management of scientific, has become the relationship between the smooth development of mechanical and electrical engineering and engineering quality of the key, A direct impact on the petrochemical construction of the overall construction quality. To this end, it is necessary for the construction of petrochemical construction of electromechanical engineering construction management to promote the construction of mechanical and electrical engineering management level gradually increased. This article on the machine Electric engineering project construction management were discussed with a view to the petrochemical construction in the relevant aspects of the need to provide reference for reference.

  14. CHEMVAL project

    International Nuclear Information System (INIS)

    Chandratillake, M.; Falck, W.E.; Read, D.

    1992-01-01

    This report summarises the development history of the CHEMVAL Thermodynamic Database, the criteria employed for data selection and the contents of Version 4.0, issued to participants on the completion of the project. It accompanies a listing of the database constructed using the dBase III + /IV database management package. (Author)

  15. 41 CFR 102-80.75 - Who assesses environmental issues in Federal construction and lease construction projects?

    Science.gov (United States)

    2010-07-01

    ... environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public... Management Assessment of Environmental Issues § 102-80.75 Who assesses environmental issues in Federal construction and lease construction projects? Federal agencies must assess required environmental issues...

  16. Methodology for construction compliance monitoring in the crediting of investment projects for road construction

    Science.gov (United States)

    Vaynshtok, Natalia

    2017-10-01

    The article provides the results of development of the methodology for construction compliance monitoring in the crediting of investment projects for road construction. Work scope analysis of construction audit was conducted and an algorithm of financial audit in the crediting investment projects was developed. Furthermore, the possible pitfalls and abuses of counterparties were investigated and recommendations were given allowing the bank to receive objective and independent information on the progress of the project in real time. This mechanism is useful for the bank in insurance of possible risks, targeted and rational use of credit funds.

  17. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project.

    Science.gov (United States)

    Hudson, Lawrence N; Newbold, Tim; Contu, Sara; Hill, Samantha L L; Lysenko, Igor; De Palma, Adriana; Phillips, Helen R P; Alhusseini, Tamera I; Bedford, Felicity E; Bennett, Dominic J; Booth, Hollie; Burton, Victoria J; Chng, Charlotte W T; Choimes, Argyrios; Correia, David L P; Day, Julie; Echeverría-Londoño, Susy; Emerson, Susan R; Gao, Di; Garon, Morgan; Harrison, Michelle L K; Ingram, Daniel J; Jung, Martin; Kemp, Victoria; Kirkpatrick, Lucinda; Martin, Callum D; Pan, Yuan; Pask-Hale, Gwilym D; Pynegar, Edwin L; Robinson, Alexandra N; Sanchez-Ortiz, Katia; Senior, Rebecca A; Simmons, Benno I; White, Hannah J; Zhang, Hanbin; Aben, Job; Abrahamczyk, Stefan; Adum, Gilbert B; Aguilar-Barquero, Virginia; Aizen, Marcelo A; Albertos, Belén; Alcala, E L; Del Mar Alguacil, Maria; Alignier, Audrey; Ancrenaz, Marc; Andersen, Alan N; Arbeláez-Cortés, Enrique; Armbrecht, Inge; Arroyo-Rodríguez, Víctor; Aumann, Tom; Axmacher, Jan C; Azhar, Badrul; Azpiroz, Adrián B; Baeten, Lander; Bakayoko, Adama; Báldi, András; Banks, John E; Baral, Sharad K; Barlow, Jos; Barratt, Barbara I P; Barrico, Lurdes; Bartolommei, Paola; Barton, Diane M; Basset, Yves; Batáry, Péter; Bates, Adam J; Baur, Bruno; Bayne, Erin M; Beja, Pedro; Benedick, Suzan; Berg, Åke; Bernard, Henry; Berry, Nicholas J; Bhatt, Dinesh; Bicknell, Jake E; Bihn, Jochen H; Blake, Robin J; Bobo, Kadiri S; Bóçon, Roberto; Boekhout, Teun; Böhning-Gaese, Katrin; Bonham, Kevin J; Borges, Paulo A V; Borges, Sérgio H; Boutin, Céline; Bouyer, Jérémy; Bragagnolo, Cibele; Brandt, Jodi S; Brearley, Francis Q; Brito, Isabel; Bros, Vicenç; Brunet, Jörg; Buczkowski, Grzegorz; Buddle, Christopher M; Bugter, Rob; Buscardo, Erika; Buse, Jörn; Cabra-García, Jimmy; Cáceres, Nilton C; Cagle, Nicolette L; Calviño-Cancela, María; Cameron, Sydney A; Cancello, Eliana M; Caparrós, Rut; Cardoso, Pedro; Carpenter, Dan; Carrijo, Tiago F; Carvalho, Anelena L; Cassano, Camila R; Castro, Helena; Castro-Luna, Alejandro A; Rolando, Cerda B; Cerezo, Alexis; Chapman, Kim Alan; Chauvat, Matthieu; Christensen, Morten; Clarke, Francis M; Cleary, Daniel F R; Colombo, Giorgio; Connop, Stuart P; Craig, Michael D; Cruz-López, Leopoldo; Cunningham, Saul A; D'Aniello, Biagio; D'Cruze, Neil; da Silva, Pedro Giovâni; Dallimer, Martin; Danquah, Emmanuel; Darvill, Ben; Dauber, Jens; Davis, Adrian L V; Dawson, Jeff; de Sassi, Claudio; de Thoisy, Benoit; Deheuvels, Olivier; Dejean, Alain; Devineau, Jean-Louis; Diekötter, Tim; Dolia, Jignasu V; Domínguez, Erwin; Dominguez-Haydar, Yamileth; Dorn, Silvia; Draper, Isabel; Dreber, Niels; Dumont, Bertrand; Dures, Simon G; Dynesius, Mats; Edenius, Lars; Eggleton, Paul; Eigenbrod, Felix; Elek, Zoltán; Entling, Martin H; Esler, Karen J; de Lima, Ricardo F; Faruk, Aisyah; Farwig, Nina; Fayle, Tom M; Felicioli, Antonio; Felton, Annika M; Fensham, Roderick J; Fernandez, Ignacio C; Ferreira, Catarina C; Ficetola, Gentile F; Fiera, Cristina; Filgueiras, Bruno K C; Fırıncıoğlu, Hüseyin K; Flaspohler, David; Floren, Andreas; Fonte, Steven J; Fournier, Anne; Fowler, Robert E; Franzén, Markus; Fraser, Lauchlan H; Fredriksson, Gabriella M; Freire, Geraldo B; Frizzo, Tiago L M; Fukuda, Daisuke; Furlani, Dario; Gaigher, René; Ganzhorn, Jörg U; García, Karla P; Garcia-R, Juan C; Garden, Jenni G; Garilleti, Ricardo; Ge, Bao-Ming; Gendreau-Berthiaume, Benoit; Gerard, Philippa J; Gheler-Costa, Carla; Gilbert, Benjamin; Giordani, Paolo; Giordano, Simonetta; Golodets, Carly; Gomes, Laurens G L; Gould, Rachelle K; Goulson, Dave; Gove, Aaron D; Granjon, Laurent; Grass, Ingo; Gray, Claudia L; Grogan, James; Gu, Weibin; Guardiola, Moisès; Gunawardene, Nihara R; Gutierrez, Alvaro G; Gutiérrez-Lamus, Doris L; Haarmeyer, Daniela H; Hanley, Mick E; Hanson, Thor; Hashim, Nor R; Hassan, Shombe N; Hatfield, Richard G; Hawes, Joseph E; Hayward, Matt W; Hébert, Christian; Helden, Alvin J; Henden, John-André; Henschel, Philipp; Hernández, Lionel; Herrera, James P; Herrmann, Farina; Herzog, Felix; Higuera-Diaz, Diego; Hilje, Branko; Höfer, Hubert; Hoffmann, Anke; Horgan, Finbarr G; Hornung, Elisabeth; Horváth, Roland; Hylander, Kristoffer; Isaacs-Cubides, Paola; Ishida, Hiroaki; Ishitani, Masahiro; Jacobs, Carmen T; Jaramillo, Víctor J; Jauker, Birgit; Hernández, F Jiménez; Johnson, McKenzie F; Jolli, Virat; Jonsell, Mats; Juliani, S Nur; Jung, Thomas S; Kapoor, Vena; Kappes, Heike; Kati, Vassiliki; Katovai, Eric; Kellner, Klaus; Kessler, Michael; Kirby, Kathryn R; Kittle, Andrew M; Knight, Mairi E; Knop, Eva; Kohler, Florian; Koivula, Matti; Kolb, Annette; Kone, Mouhamadou; Kőrösi, Ádám; Krauss, Jochen; Kumar, Ajith; Kumar, Raman; Kurz, David J; Kutt, Alex S; Lachat, Thibault; Lantschner, Victoria; Lara, Francisco; Lasky, Jesse R; Latta, Steven C; Laurance, William F; Lavelle, Patrick; Le Féon, Violette; LeBuhn, Gretchen; Légaré, Jean-Philippe; Lehouck, Valérie; Lencinas, María V; Lentini, Pia E; Letcher, Susan G; Li, Qi; Litchwark, Simon A; Littlewood, Nick A; Liu, Yunhui; Lo-Man-Hung, Nancy; López-Quintero, Carlos A; Louhaichi, Mounir; Lövei, Gabor L; Lucas-Borja, Manuel Esteban; Luja, Victor H; Luskin, Matthew S; MacSwiney G, M Cristina; Maeto, Kaoru; Magura, Tibor; Mallari, Neil Aldrin; Malone, Louise A; Malonza, Patrick K; Malumbres-Olarte, Jagoba; Mandujano, Salvador; Måren, Inger E; Marin-Spiotta, Erika; Marsh, Charles J; Marshall, E J P; Martínez, Eliana; Martínez Pastur, Guillermo; Moreno Mateos, David; Mayfield, Margaret M; Mazimpaka, Vicente; McCarthy, Jennifer L; McCarthy, Kyle P; McFrederick, Quinn S; McNamara, Sean; Medina, Nagore G; Medina, Rafael; Mena, Jose L; Mico, Estefania; Mikusinski, Grzegorz; Milder, Jeffrey C; Miller, James R; Miranda-Esquivel, Daniel R; Moir, Melinda L; Morales, Carolina L; Muchane, Mary N; Muchane, Muchai; Mudri-Stojnic, Sonja; Munira, A Nur; Muoñz-Alonso, Antonio; Munyekenye, B F; Naidoo, Robin; Naithani, A; Nakagawa, Michiko; Nakamura, Akihiro; Nakashima, Yoshihiro; Naoe, Shoji; Nates-Parra, Guiomar; Navarrete Gutierrez, Dario A; Navarro-Iriarte, Luis; Ndang'ang'a, Paul K; Neuschulz, Eike L; Ngai, Jacqueline T; Nicolas, Violaine; Nilsson, Sven G; Noreika, Norbertas; Norfolk, Olivia; Noriega, Jorge Ari; Norton, David A; Nöske, Nicole M; Nowakowski, A Justin; Numa, Catherine; O'Dea, Niall; O'Farrell, Patrick J; Oduro, William; Oertli, Sabine; Ofori-Boateng, Caleb; Oke, Christopher Omamoke; Oostra, Vicencio; Osgathorpe, Lynne M; Otavo, Samuel Eduardo; Page, Navendu V; Paritsis, Juan; Parra-H, Alejandro; Parry, Luke; Pe'er, Guy; Pearman, Peter B; Pelegrin, Nicolás; Pélissier, Raphaël; Peres, Carlos A; Peri, Pablo L; Persson, Anna S; Petanidou, Theodora; Peters, Marcell K; Pethiyagoda, Rohan S; Phalan, Ben; Philips, T Keith; Pillsbury, Finn C; Pincheira-Ulbrich, Jimmy; Pineda, Eduardo; Pino, Joan; Pizarro-Araya, Jaime; Plumptre, A J; Poggio, Santiago L; Politi, Natalia; Pons, Pere; Poveda, Katja; Power, Eileen F; Presley, Steven J; Proença, Vânia; Quaranta, Marino; Quintero, Carolina; Rader, Romina; Ramesh, B R; Ramirez-Pinilla, Martha P; Ranganathan, Jai; Rasmussen, Claus; Redpath-Downing, Nicola A; Reid, J Leighton; Reis, Yana T; Rey Benayas, José M; Rey-Velasco, Juan Carlos; Reynolds, Chevonne; Ribeiro, Danilo Bandini; Richards, Miriam H; Richardson, Barbara A; Richardson, Michael J; Ríos, Rodrigo Macip; Robinson, Richard; Robles, Carolina A; Römbke, Jörg; Romero-Duque, Luz Piedad; Rös, Matthias; Rosselli, Loreta; Rossiter, Stephen J; Roth, Dana S; Roulston, T'ai H; Rousseau, Laurent; Rubio, André V; Ruel, Jean-Claude; Sadler, Jonathan P; Sáfián, Szabolcs; Saldaña-Vázquez, Romeo A; Sam, Katerina; Samnegård, Ulrika; Santana, Joana; Santos, Xavier; Savage, Jade; Schellhorn, Nancy A; Schilthuizen, Menno; Schmiedel, Ute; Schmitt, Christine B; Schon, Nicole L; Schüepp, Christof; Schumann, Katharina; Schweiger, Oliver; Scott, Dawn M; Scott, Kenneth A; Sedlock, Jodi L; Seefeldt, Steven S; Shahabuddin, Ghazala; Shannon, Graeme; Sheil, Douglas; Sheldon, Frederick H; Shochat, Eyal; Siebert, Stefan J; Silva, Fernando A B; Simonetti, Javier A; Slade, Eleanor M; Smith, Jo; Smith-Pardo, Allan H; Sodhi, Navjot S; Somarriba, Eduardo J; Sosa, Ramón A; Soto Quiroga, Grimaldo; St-Laurent, Martin-Hugues; Starzomski, Brian M; Stefanescu, Constanti; Steffan-Dewenter, Ingolf; Stouffer, Philip C; Stout, Jane C; Strauch, Ayron M; Struebig, Matthew J; Su, Zhimin; Suarez-Rubio, Marcela; Sugiura, Shinji; Summerville, Keith S; Sung, Yik-Hei; Sutrisno, Hari; Svenning, Jens-Christian; Teder, Tiit; Threlfall, Caragh G; Tiitsaar, Anu; Todd, Jacqui H; Tonietto, Rebecca K; Torre, Ignasi; Tóthmérész, Béla; Tscharntke, Teja; Turner, Edgar C; Tylianakis, Jason M; Uehara-Prado, Marcio; Urbina-Cardona, Nicolas; Vallan, Denis; Vanbergen, Adam J; Vasconcelos, Heraldo L; Vassilev, Kiril; Verboven, Hans A F; Verdasca, Maria João; Verdú, José R; Vergara, Carlos H; Vergara, Pablo M; Verhulst, Jort; Virgilio, Massimiliano; Vu, Lien Van; Waite, Edward M; Walker, Tony R; Wang, Hua-Feng; Wang, Yanping; Watling, James I; Weller, Britta; Wells, Konstans; Westphal, Catrin; Wiafe, Edward D; Williams, Christopher D; Willig, Michael R; Woinarski, John C Z; Wolf, Jan H D; Wolters, Volkmar; Woodcock, Ben A; Wu, Jihua; Wunderle, Joseph M; Yamaura, Yuichi; Yoshikura, Satoko; Yu, Douglas W; Zaitsev, Andrey S; Zeidler, Juliane; Zou, Fasheng; Collen, Ben; Ewers, Rob M; Mace, Georgina M; Purves, Drew W; Scharlemann, Jörn P W; Purvis, Andy

    2017-01-01

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of human impacts relating to land use. We have used this evidence base to develop global and regional statistical models of how local biodiversity responds to these measures. We describe and make freely available this 2016 release of the database, containing more than 3.2 million records sampled at over 26,000 locations and representing over 47,000 species. We outline how the database can help in answering a range of questions in ecology and conservation biology. To our knowledge, this is the largest and most geographically and taxonomically representative database of spatial comparisons of biodiversity that has been collated to date; it will be useful to researchers and international efforts wishing to model and understand the global status of biodiversity.

  18. Knowledge Management Practice on Construction Project ...

    African Journals Online (AJOL)

    Likewise, the results further indicated 19 benefits of KM practice for improving construction project performance and include: improve project quality, cost and time; practice and process improvement; encourage effective teamwork and innovation; improve the client satisfaction; boost productivity of employees and processes; ...

  19. Geotechnical Materials Database for Embankment Design and Construction

    Science.gov (United States)

    2011-12-01

    This project was focused on the assimilation of engineering properties of borrow soils across the state of : South Carolina. Extensive data on soils used for embankment construction were evaluated and compared : within Group A (Piedmont) and Group B ...

  20. 7 CFR 1726.403 - Project construction contract closeout.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Project construction contract closeout. 1726.403... § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on... American” certificate. (iii) RUS Form 224, Waiver and Release of Lien, from each manufacturer, supplier...

  1. Development of Earned Value Management System in PP Construction Project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Sang-Hyun; Moon, Byeong-Suk [KHNP-CRI, Daejeon (Korea, Republic of)

    2014-10-15

    The NPP construction project has been determined in the form of a rather lump-sum contract with little details in resource requirements and estimations. Therefore, Earned Value Management System (EVMS) needs to be applied to the NPP projects in order to incorporate scope, schedule and cost targeting efficient and to control effective resource. The NPP projects in Korea have not applied EVMS. EVMS has phased in NPP construction project by Korea Hydro and Nuclear Power Co., Ltd (KHNP), playing the role of project master manager in NPP construction in Korea. This study presented the EVMS unlike other system. Accordingly, EVMS is expected to reduce risks and increase efficiency in the NPP project. The NPP construction project is a technology ntensive multi-construction project that should be based on economics and stability and that takes over ten years to complete, requiring investment of billions of dollars, a great number of persons concerned, and a vast store of human and material resources. KHNP is phasing EVMS in NPP construction project for overseas contracts and the efficient management, the paper presented the pilot EVMS in KHNP. It expected to control and identify of NPP construction projects by using EVMS as a computerized management tool which is quantitative and objective management criteria. It is necessary to improve of the contract system related EVM for enterprise system, and the effort will be required, such as on-site support and training so that this can be done in collaboration with the relevant stakeholders.

  2. U.S. LCI Database Project--Final Phase I Report

    Energy Technology Data Exchange (ETDEWEB)

    2003-08-01

    This Phase I final report reviews the process and provides a plan for the execution of subsequent phases of the database project, including recommended data development priorities and a preliminary cost estimate. The ultimate goal of the project is to develop publicly available LCI Data modules for commonly used materials, products, and processes.

  3. Causes of Low-Skilled Workers’ Performance in Construction Projects

    OpenAIRE

    Alhaji Ali Zannah; Aryani Ahmad Latiffi; Abdulazeez Umar Raji; Abdullahi Abba Waziri; Usman Mohammed 4

    2017-01-01

    Skilled workers’ performance is one of the crucial aspects of labour productivity that requires proper attention for effective projects delivery in the construction industry. The level of skilled workers’ low performance has been seen to be a major factor which contributes toward inefficient construction projects productivity. Therefore, the objective of this research is to identify the causes of low-skilled workers’ performance in construction projects in the Nigeria. The objective was achie...

  4. 42 CFR 137.362 - May construction project agreements be amended?

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May construction project agreements be amended? 137... of the Secretary in Establishing and Implementing Construction Project Agreements § 137.362 May construction project agreements be amended? Yes, the Self-Governance Tribe, at its discretion, may request the...

  5. Final Report on Atomic Database Project

    International Nuclear Information System (INIS)

    Yuan, J.; Gui, Z.; Moses, G.A.

    2006-01-01

    Atomic physics in hot dense plasmas is essential for understanding the radiative properties of plasmas either produced terrestrially such as in fusion energy research or in space such as the study of the core of the sun. Various kinds of atomic data are needed for spectrum analysis or for radiation hydrodynamics simulations. There are many atomic databases accessible publicly through the web, such as CHIANTI (an atomic database for spectroscopic diagnostics for astrophysical plasmas) from Naval Research Laboratory [1], collaborative development of TOPbase (The Opacity Project for astrophysically abundant elements) [2], NIST atomic spectra database from NIST [3], TOPS Opacities from Los Alamos National Laboratory [4], etc. Most of these databases are specific to astrophysics, which provide energy levels, oscillator strength f and photoionization cross sections for astrophysical elements ( Z=1-26). There are abundant spectrum data sources for spectral analysis of low Z elements. For opacities used for radiation transport, TOPS Opacities from LANL is the most valuable source. The database provides mixed opacities from element for H (Z=1) to Zn (Z=30) The data in TOPS Opacities is calculated by the code LEDCOP. In the Fusion Technology Institute, we also have developed several different models to calculate atomic data and opacities, such as the detailed term accounting model (DTA) and the unresolved transition array (UTA) model. We use the DTA model for low-Z materials since an enormous number of transitions need to be computed for medium or high-Z materials. For medium and high Z materials, we use the UTA model which simulates the enormous number of transitions by using a single line profile to represent a collection of transition arrays. These models have been implemented in our computing code JATBASE and RSSUTA. For plasma populations, two models are used in JATBASE, one is the local thermodynamic equilibrium (LTE) model and the second is the non-LTE model. For the

  6. [Project evidência [evidence]: research and education about accessing scientific databases in Azores].

    Science.gov (United States)

    Soares, Hélia; Pereira, Sandra M; Neves, Ajuda; Gomes, Amy; Teixeira, Bruno; Oliveira, Carolina; Sousa, Fábio; Tavares, Márcio; Tavares, Patrícia; Dutra, Raquel; Pereira, Hélder Rocha

    2013-04-01

    Project Evidência [Evidence] intends to promote the use of scientific databases among nurses. This study aims to design educational interventions that facilitate nurses' access to these databases, to determine nurses' habits regarding the use of scientific databases, and to determine the impact that educational interventions on scientific databases have on Azorean nurses who volunteered for this project. An intervention project was conducted, and a quantitative descriptive survey was designed to evaluate the impact two and five months after the educational intervention. This impact was investigated considering certain aspects, namely, the nurses' knowledge, habits and reasons for using scientific databases. A total of 192 nurses participated in this study, and the primary results indicate that the educational intervention had a positive impact based not only on the increased frequency of using platforms or databases of scientific information (DSIs) s but also on the competence and self-awareness regarding its use and consideration of the reasons for accessing this information.

  7. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    DEFF Research Database (Denmark)

    Hudson, Lawrence N; Newbold, Tim; Contu, Sara

    2017-01-01

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity ...

  8. Identification and assessment of risk factors affecting construction projects

    Directory of Open Access Journals (Sweden)

    Mohamed Sayed Bassiony Ahmed Abd El-Karim

    2017-08-01

    Unexpected increase in cost and delays in construction projects are caused by owner, contractor, environments, etc. in which several types of risk factors may occur concurrently. The effect of cost overrun and schedule overrun do not only influence the construction industry but the overall economy as well. Even though construction project increasing in cost and schedule has received extensive attention of researchers, but because of continuous changes and development in the field, the study considered of added value to the construction industry in Egypt, in addition to risk strategy and plan analysis. In order to meet the deadline of a project and due to the complex nature of construction projects, cost and scheduling should be flexible enough to accommodate changes without negatively affecting the overall project cost and duration. As such, the objectives of the presented research in this paper are to identify, study, and assess the effect of the factors that affect cost and time contingency. Data are collected from sixteen construction companies in Egypt. The collected data, output charts and analyses spreadsheets will be used for the development of computerized model built by the authors with identification abbreviation RIAM.

  9. REVIEW ON CONSTRUCTION PROJECT MANAGEMENT SOFTWARE PRIMAVERA P6

    OpenAIRE

    Piyush Pramod Bagade* & Prof. Abhijit Bhirud

    2018-01-01

    Planning, scheduling and Resource levelling plays an important role in any construction project maybe it is construction of building or construction of road. In absence of proper planning, scheduling and resource levelling construction industry does not get profit over the project. For this purpose, proper software’s and techniques must be utilize. This paper is focussing on the advantages of Oracle Primavera P6 Software. The latest version of Primavera is P6-17. In any construction work huge...

  10. The NEA thermochemical database project. 30 years of accomplishments

    International Nuclear Information System (INIS)

    Ragoussi, Maria-Eleni; Brassinnes, Stephane

    2015-01-01

    The NEA Thermochemical Database (TDB) Project (www.oecd-nea.org/dbtdb/) provides a database of chemical thermodynamic values treating the most significant elements related to nuclear waste management. The work carried out since the initiation of TDB in 1984 has resulted in the publication of thirteen major reviews and a large set of selected values that have become an international reference in the field, as they are characterized for their accuracy, consistency and high quality. Herein, we describe the basis, scientific principles and organization of the TDB project, together with its evolution from its inception to the present organization as a joint undertaking under Article 5(b) of the Statute of the OECD Nuclear Energy Agency (NEA).

  11. Waste diminution in Construction projects: Environmental Predicaments

    Science.gov (United States)

    Gharehbaghi, Koorosh; Scott-Young, Christina

    2018-03-01

    Waste diminution in construction projects is not only a behavioural issue, but also an energy consumption and reduction concern. With construction waste equating to the significant amount of exhausted energy together with increased pollution, this contributes to a series of environmental predicaments. The overall goal of construction solid Waste Management is to collect, treat and dispose of solid wastes generated by project activities in an environmentally and socially satisfactory manner, using the most economical means available. As cities expand, their construction activities and consumption patterns further drive up the solid waste quantities. Governments are usually authorized to have responsibility for providing solid Waste Management services, and various administrative laws give them exclusive ownership over the waste produced. In addition, construction waste processing can be further controlled and minimized according to specialized authorities such as Environmental Protection Agencies (EPA) and their relevant acts and regulations. Moreover, a Construction Environmental Management Plan (CEMP) can further control the treatment of waste and therefore, reduce the amount produced. Key elements of a CEMP not only include complying with relevant legislation, standards and guidance from the EPA; however, also to ensuring that there are systems in place to resolve any potential problems associated with site activities. Accordingly, as a part of energy consumption and lessening strategies, this paper will discuss various effective waste reduction methods for construction projects. Finally, this paper will also examine tactics to further improve energy efficiency through innovative construction Waste Management strategies (including desirability rating of most favourable options) to promote the lessening of overall CO2production.

  12. Leadership Quality for Malaysia Construction Leader to Steer a Success Construction Project

    OpenAIRE

    Ngah Nasaruddin Nur Ain; Abdul Rahman Ismail

    2016-01-01

    Issues that dominate the construction industry for the long time such as time overrun, cost overrun, quality of construction and also safety during the construction process are difficult to resolve because of several factors involved which amongst them are leadership quality in the industry. Solving these issues can make the industry more sustainable in nature. This paper presents the need of leadership quality among construction parties involved to steer a construction project successfully. ...

  13. Construction of special structures for nuclear power projects

    International Nuclear Information System (INIS)

    Raghavan, N.

    2003-01-01

    Construction is a very important stage in the course of realization of Nuclear Power Projects and as much care has be devoted to this stage as to the planning and engineering stages. While the setting up of nuclear power projects used to take over seven years in the past, the time period has now been considerably reduced to about five years with advancements in construction engineering, project management and design techniques, on the basis of new initiatives from the owner agency, Nuclear Power Corporation of India. In this article, the constructional aspects of the specialized structures for nuclear power generation are looked into. (author)

  14. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    NARCIS (Netherlands)

    Hudson, Lawrence N; Newbold, Tim; Contu, Sara; Hill, Samantha L L; Lysenko, Igor; De Palma, Adriana; Phillips, Helen R P; Alhusseini, Tamera I; Bedford, Felicity E; Bennett, Dominic J; Booth, Hollie; Burton, Victoria J; Chng, Charlotte W T; Choimes, Argyrios; Correia, David L P; Day, Julie; Echeverría-Londoño, Susy; Emerson, Susan R; Gao, Di; Garon, Morgan; Harrison, Michelle L K; Ingram, Daniel J; Jung, Martin; Kemp, Victoria; Kirkpatrick, Lucinda; Martin, Callum D; Pan, Yuan; Pask-Hale, Gwilym D; Pynegar, Edwin L; Robinson, Alexandra N; Sanchez-Ortiz, Katia; Senior, Rebecca A; Simmons, Benno I; White, Hannah J; Zhang, Hanbin; Aben, Job; Abrahamczyk, Stefan; Adum, Gilbert B; Aguilar-Barquero, Virginia; Aizen, Marcelo A; Albertos, Belén; Alcala, E L; Del Mar Alguacil, Maria; Alignier, Audrey; Ancrenaz, Marc; Andersen, Alan N; Arbeláez-Cortés, Enrique; Armbrecht, Inge; Arroyo-Rodríguez, Víctor; Aumann, Tom; Axmacher, Jan C; Azhar, Badrul; Azpiroz, Adrián B; Baeten, Lander; Bakayoko, Adama; Báldi, András; Banks, John E; Baral, Sharad K; Barlow, Jos; Barratt, Barbara I P; Barrico, Lurdes; Bartolommei, Paola; Barton, Diane M; Basset, Yves; Batáry, Péter; Bates, Adam J; Baur, Bruno; Bayne, Erin M; Beja, Pedro; Benedick, Suzan; Berg, Åke; Bernard, Henry; Berry, Nicholas J; Bhatt, Dinesh; Bicknell, Jake E; Bihn, Jochen H; Blake, Robin J; Bobo, Kadiri S; Bóçon, Roberto; Boekhout, Teun; Böhning-Gaese, Katrin; Bonham, Kevin J; Borges, Paulo A V; Borges, Sérgio H; Boutin, Céline; Bouyer, Jérémy; Bragagnolo, Cibele; Brandt, Jodi S; Brearley, Francis Q; Brito, Isabel; Bros, Vicenç; Brunet, Jörg; Buczkowski, Grzegorz; Buddle, Christopher M; Bugter, Rob; Buscardo, Erika; Buse, Jörn; Cabra-García, Jimmy; Cáceres, Nilton C; Cagle, Nicolette L; Calviño-Cancela, María; Cameron, Sydney A; Cancello, Eliana M; Caparrós, Rut; Cardoso, Pedro; Carpenter, Dan; Carrijo, Tiago F; Carvalho, Anelena L; Cassano, Camila R; Castro, Helena; Castro-Luna, Alejandro A; Rolando, Cerda B; Cerezo, Alexis; Chapman, Kim Alan; Chauvat, Matthieu; Christensen, Morten; Clarke, Francis M; Cleary, Daniel F R; Colombo, Giorgio; Connop, Stuart P; Craig, Michael D; Cruz-López, Leopoldo; Cunningham, Saul A; D'Aniello, Biagio; D'Cruze, Neil; da Silva, Pedro Giovâni; Dallimer, Martin; Danquah, Emmanuel; Darvill, Ben; Dauber, Jens; Davis, Adrian L V; Dawson, Jeff; de Sassi, Claudio; de Thoisy, Benoit; Deheuvels, Olivier; Dejean, Alain; Devineau, Jean-Louis; Diekötter, Tim; Dolia, Jignasu V; Domínguez, Erwin; Dominguez-Haydar, Yamileth; Dorn, Silvia; Draper, Isabel; Dreber, Niels; Dumont, Bertrand; Dures, Simon G; Dynesius, Mats; Edenius, Lars; Eggleton, Paul; Eigenbrod, Felix; Elek, Zoltán; Entling, Martin H; Esler, Karen J; de Lima, Ricardo F; Faruk, Aisyah; Farwig, Nina; Fayle, Tom M; Felicioli, Antonio; Felton, Annika M; Fensham, Roderick J; Fernandez, Ignacio C; Ferreira, Catarina C; Ficetola, Gentile F; Fiera, Cristina; Filgueiras, Bruno K C; Fırıncıoğlu, Hüseyin K; Flaspohler, David; Floren, Andreas; Fonte, Steven J; Fournier, Anne; Fowler, Robert E; Franzén, Markus; Fraser, Lauchlan H; Fredriksson, Gabriella M; Freire, Geraldo B; Frizzo, Tiago L M; Fukuda, Daisuke; Furlani, Dario; Gaigher, René; Ganzhorn, Jörg U; García, Karla P; Garcia-R, Juan C; Garden, Jenni G; Garilleti, Ricardo; Ge, Bao-Ming; Gendreau-Berthiaume, Benoit; Gerard, Philippa J; Gheler-Costa, Carla; Gilbert, Benjamin; Giordani, Paolo; Giordano, Simonetta; Golodets, Carly; Gomes, Laurens G L; Gould, Rachelle K; Goulson, Dave; Gove, Aaron D; Granjon, Laurent; Grass, Ingo; Gray, Claudia L; Grogan, James; Gu, Weibin; Guardiola, Moisès; Gunawardene, Nihara R; Gutierrez, Alvaro G; Gutiérrez-Lamus, Doris L; Haarmeyer, Daniela H; Hanley, Mick E; Hanson, Thor; Hashim, Nor R; Hassan, Shombe N; Hatfield, Richard G; Hawes, Joseph E; Hayward, Matt W; Hébert, Christian; Helden, Alvin J; Henden, John-André; Henschel, Philipp; Hernández, Lionel; Herrera, James P; Herrmann, Farina; Herzog, Felix; Higuera-Diaz, Diego; Hilje, Branko; Höfer, Hubert; Hoffmann, Anke; Horgan, Finbarr G; Hornung, Elisabeth; Horváth, Roland; Hylander, Kristoffer; Isaacs-Cubides, Paola; Ishida, Hiroaki; Ishitani, Masahiro; Jacobs, Carmen T; Jaramillo, Víctor J; Jauker, Birgit; Hernández, F Jiménez; Johnson, McKenzie F; Jolli, Virat; Jonsell, Mats; Juliani, S Nur; Jung, Thomas S; Kapoor, Vena; Kappes, Heike; Kati, Vassiliki; Katovai, Eric; Kellner, Klaus; Kessler, Michael; Kirby, Kathryn R; Kittle, Andrew M; Knight, Mairi E; Knop, Eva; Kohler, Florian; Koivula, Matti; Kolb, Annette; Kone, Mouhamadou; Kőrösi, Ádám; Krauss, Jochen; Kumar, Ajith; Kumar, Raman; Kurz, David J; Kutt, Alex S; Lachat, Thibault; Lantschner, Victoria; Lara, Francisco; Lasky, Jesse R; Latta, Steven C; Laurance, William F; Lavelle, Patrick; Le Féon, Violette; LeBuhn, Gretchen; Légaré, Jean-Philippe; Lehouck, Valérie; Lencinas, María V; Lentini, Pia E; Letcher, Susan G; Li, Qi; Litchwark, Simon A; Littlewood, Nick A; Liu, Yunhui; Lo-Man-Hung, Nancy; López-Quintero, Carlos A; Louhaichi, Mounir; Lövei, Gabor L; Lucas-Borja, Manuel Esteban; Luja, Victor H; Luskin, Matthew S; MacSwiney G, M Cristina; Maeto, Kaoru; Magura, Tibor; Mallari, Neil Aldrin; Malone, Louise A; Malonza, Patrick K; Malumbres-Olarte, Jagoba; Mandujano, Salvador; Måren, Inger E; Marin-Spiotta, Erika; Marsh, Charles J; Marshall, E J P; Martínez, Eliana; Martínez Pastur, Guillermo; Moreno Mateos, David; Mayfield, Margaret M; Mazimpaka, Vicente; McCarthy, Jennifer L; McCarthy, Kyle P; McFrederick, Quinn S; McNamara, Sean; Medina, Nagore G; Medina, Rafael; Mena, Jose L; Mico, Estefania; Mikusinski, Grzegorz; Milder, Jeffrey C; Miller, James R; Miranda-Esquivel, Daniel R; Moir, Melinda L; Morales, Carolina L; Muchane, Mary N; Muchane, Muchai; Mudri-Stojnic, Sonja; Munira, A Nur; Muoñz-Alonso, Antonio; Munyekenye, B F; Naidoo, Robin; Naithani, A; Nakagawa, Michiko; Nakamura, Akihiro; Nakashima, Yoshihiro; Naoe, Shoji; Nates-Parra, Guiomar; Navarrete Gutierrez, Dario A; Navarro-Iriarte, Luis; Ndang'ang'a, Paul K; Neuschulz, Eike L; Ngai, Jacqueline T; Nicolas, Violaine; Nilsson, Sven G; Noreika, Norbertas; Norfolk, Olivia; Noriega, Jorge Ari; Norton, David A; Nöske, Nicole M; Nowakowski, A Justin; Numa, Catherine; O'Dea, Niall; O'Farrell, Patrick J; Oduro, William; Oertli, Sabine; Ofori-Boateng, Caleb; Oke, Christopher Omamoke; Oostra, Vicencio; Osgathorpe, Lynne M; Otavo, Samuel Eduardo; Page, Navendu V; Paritsis, Juan; Parra-H, Alejandro; Parry, Luke; Pe'er, Guy; Pearman, Peter B; Pelegrin, Nicolás; Pélissier, Raphaël; Peres, Carlos A; Peri, Pablo L; Persson, Anna S; Petanidou, Theodora; Peters, Marcell K; Pethiyagoda, Rohan S; Phalan, Ben; Philips, T Keith; Pillsbury, Finn C; Pincheira-Ulbrich, Jimmy; Pineda, Eduardo; Pino, Joan; Pizarro-Araya, Jaime; Plumptre, A J; Poggio, Santiago L; Politi, Natalia; Pons, Pere; Poveda, Katja; Power, Eileen F; Presley, Steven J; Proença, Vânia; Quaranta, Marino; Quintero, Carolina; Rader, Romina; Ramesh, B R; Ramirez-Pinilla, Martha P; Ranganathan, Jai; Rasmussen, Claus; Redpath-Downing, Nicola A; Reid, J Leighton; Reis, Yana T; Rey Benayas, José M; Rey-Velasco, Juan Carlos; Reynolds, Chevonne; Ribeiro, Danilo Bandini; Richards, Miriam H; Richardson, Barbara A; Richardson, Michael J; Ríos, Rodrigo Macip; Robinson, Richard; Robles, Carolina A; Römbke, Jörg; Romero-Duque, Luz Piedad; Rös, Matthias; Rosselli, Loreta; Rossiter, Stephen J; Roth, Dana S; Roulston, T'ai H; Rousseau, Laurent; Rubio, André V; Ruel, Jean-Claude; Sadler, Jonathan P; Sáfián, Szabolcs; Saldaña-Vázquez, Romeo A; Sam, Katerina; Samnegård, Ulrika; Santana, Joana; Santos, Xavier; Savage, Jade; Schellhorn, Nancy A; Schilthuizen, Menno; Schmiedel, Ute; Schmitt, Christine B; Schon, Nicole L; Schüepp, Christof; Schumann, Katharina; Schweiger, Oliver; Scott, Dawn M; Scott, Kenneth A; Sedlock, Jodi L; Seefeldt, Steven S; Shahabuddin, Ghazala; Shannon, Graeme; Sheil, Douglas; Sheldon, Frederick H; Shochat, Eyal; Siebert, Stefan J; Silva, Fernando A B; Simonetti, Javier A; Slade, Eleanor M; Smith, Jo; Smith-Pardo, Allan H; Sodhi, Navjot S; Somarriba, Eduardo J; Sosa, Ramón A; Soto Quiroga, Grimaldo; St-Laurent, Martin-Hugues; Starzomski, Brian M; Stefanescu, Constanti; Steffan-Dewenter, Ingolf; Stouffer, Philip C; Stout, Jane C; Strauch, Ayron M; Struebig, Matthew J; Su, Zhimin; Suarez-Rubio, Marcela; Sugiura, Shinji; Summerville, Keith S; Sung, Yik-Hei; Sutrisno, Hari; Svenning, Jens-Christian; Teder, Tiit; Threlfall, Caragh G; Tiitsaar, Anu; Todd, Jacqui H; Tonietto, Rebecca K; Torre, Ignasi; Tóthmérész, Béla; Tscharntke, Teja; Turner, Edgar C; Tylianakis, Jason M; Uehara-Prado, Marcio; Urbina-Cardona, Nicolas; Vallan, Denis; Vanbergen, Adam J; Vasconcelos, Heraldo L; Vassilev, Kiril; Verboven, Hans A F; Verdasca, Maria João; Verdú, José R; Vergara, Carlos H; Vergara, Pablo M; Verhulst, Jort; Virgilio, Massimiliano; Vu, Lien Van; Waite, Edward M; Walker, Tony R; Wang, Hua-Feng; Wang, Yanping; Watling, James I; Weller, Britta; Wells, Konstans; Westphal, Catrin; Wiafe, Edward D; Williams, Christopher D; Willig, Michael R; Woinarski, John C Z; Wolf, Jan H D; Wolters, Volkmar; Woodcock, Ben A; Wu, Jihua; Wunderle, Joseph M; Yamaura, Yuichi; Yoshikura, Satoko; Yu, Douglas W; Zaitsev, Andrey S; Zeidler, Juliane; Zou, Fasheng; Collen, Ben; Ewers, Rob M; Mace, Georgina M; Purves, Drew W; Scharlemann, Jörn P W; Purvis, Andy

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of

  15. Leveraging Text Content for Management of Construction Project Documents

    Science.gov (United States)

    Alqady, Mohammed

    2012-01-01

    The construction industry is a knowledge intensive industry. Thousands of documents are generated by construction projects. Documents, as information carriers, must be managed effectively to ensure successful project management. The fact that a single project can produce thousands of documents and that a lot of the documents are generated in a…

  16. Construction of a PIXE database for supporting PIXE studies. Database of experimental conditions and elemental concentration for various samples

    International Nuclear Information System (INIS)

    Itoh, J.; Saitoh, Y.; Futatsugawa, S.; Sera, K.; Ishii, K.

    2007-01-01

    A database of PIXE data, which have been accumulated at NMCC, has been constructed. In order to fill up the database, data are newly obtained as many as possible for the kind of samples whose number is small. In addition, the data for different measuring conditions are obtained for several samples. As the number of γ-ray spectrum obtained with a HPGe detector for the purpose of analyzing light elements such as fluorine, is overwhelmingly small in comparison with that of usual PIXE spectra, γ-ray spectrum and elemental concentration of fluorine are obtained as many as possible for food, environmental and hair samples. In addition, the data taken with an in-air PIXE system have been obtained for various samples. As a result, the database involving contents over various research fields is constructed, and it is expected to be useful for researches who make use of analytical techniques. It is expected that this work will give a start to many researchers to participate in the database and to make calibration with each other in order to establish reliable analytical techniques. Moreover, the final goal of the database is to establish the control concentration values for typical samples. As the first step of establishing the control values, average elemental concentration and its standard deviations in hair samples taken from 405 healthy Japanese are obtained and tabulated according to their sex and age. (author)

  17. Assessing Environmental Impact Indicators in Road Construction Projects in Developing Countries

    Directory of Open Access Journals (Sweden)

    Mohamed Marzouk

    2017-05-01

    Full Text Available Environmental pollution is considered to be one of the main concerns in the construction industry. Environmental pollution has become a major challenge to construction projects due to the huge amount of pollution caused by construction projects. There are different types of environmental impact indicators, such as the greenhouse gas (GHG footprint, eutrophication potential (EP, acidification potential (AP, human health (HH particulate, ozone depletion, and smog. Each of these environmental impact indicators can be linked to different phases of the construction projects. The overall environmental impact indicators can be divided into direct, indirect, and operational emissions. This paper presents a Building Information Modeling (BIM-based methodology for the assessment of environmental impacts in road construction projects. The model takes into account the overall life cycle of the road construction project, which is divided into: manufacturing phase, transportation phase, construction phase, maintenance phase, operational phase, recycling phase, and deconstruction phase. A case study is presented to demonstrate the applicability of the proposed model. The proposed model solves a major problem for road construction project teams who want to assess the environmental impact indicators associated with their project prior to the start of the execution of their projects.

  18. Quality Management System at Construction Project: A Questionnaire Survey

    OpenAIRE

    P.P.Mane; J.R.Patil

    2015-01-01

    The best quality, time and cost are the important aspects of successful construction project which fulfills the main goal of construction industry. The quality management has to provide the environment within which related tools, techniques and procedures can be deployed effectively leading to operational success for a construction project. The role of quality management for a construction company is not an isolated activity, but intertwined with all the operational and managerial...

  19. 42 CFR 137.327 - May multiple projects be included in a single construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...

  20. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Keywords: Communication skills and leadership model, construction project ..... help a manager handle stress and break tension (Gido & Clements,. 2012: 331; Harrin .... production and management of projects, the higher the demand for.

  1. Nuclear power project construction quality acceptance standards Implementation and discussion

    International Nuclear Information System (INIS)

    Lai Shifu

    2013-01-01

    Project quality construction acceptance is an important element of nuclear power project quality management. Based on characteristics of NPP construction and refer to national construction quality acceptance code and industry regulation, this paper introduces and discusses NPP construction quality acceptance regulation improvement and implementation under current situation. (authors)

  2. D Digital Model Database Applied to Conservation and Research of Wooden Construction in China

    Science.gov (United States)

    Zheng, Y.

    2013-07-01

    Protected by the Tai-Hang Mountains, Shanxi Province, located in north central China, is a highly prosperous, densely populated valley and considered to be one of the cradles of Chinese civilization. Its continuous habitation and rich culture have given rise to a large number of temple complexes and pavilions. Among these structures, 153 can be dated as early as from the Tang dynasty (618- 907C.E.) to the end of the Yuan dynasty (1279-1368C.E.) in Southern Shanxi area. The buildings are the best-preserved examples of wooden Chinese architecture in existence, exemplifying historic building technology and displaying highly intricate architectural decoration and detailing. They have survived war, earthquakes, and, in the last hundred years, neglect. In 2005, a decade-long conservation project was initiated by the State Administration of Cultural Heritage of China (SACH) to conserve and document these important buildings. The conservation process requires stabilization, conservation of important features, and, where necessary, partial dismantlement in order to replace unsound structural elements. Project team of CHCC have developed a practical recording system that created a record of all building components prior to and during the conservation process. After that we are trying to establish a comprehensive database which include all of the 153 earlier buildings, through which we can easily entering, browse, indexing information of the wooden construction, even deep into component details. The Database can help us to carry out comparative studies of these wooden structures, and, provide important support for the continued conservation of these heritage buildings. For some of the most important wooden structure, we have established three-dimensional models. Connected the Database with 3D Digital Model based on ArcGIS, we have developed 3D Digital Model Database for these cherish buildings. The 3D Digital Model Database helps us set up an integrate information inventory

  3. Expansive Learning in Construction Projects - a Contradiction in terms?

    DEFF Research Database (Denmark)

    Klitgaard, Anne; Nissen, Søren Bülow; Beck, Frederikke

    2016-01-01

    This research is a preliminary study performed as part of a primary research into expansive learning in interorganizational network set up to solve a construction project. The construction industry has long had issues about productivity, which can be an indication of lack of learning. A case study...... acquisition and participation but not by expansive learning. The construction industry needs to accept that the learning generated from projects will be limited to learning by acquisition and participation. The interorganizational network cannot facilitate expansive learning while working on object......-fixed projects. Research in construction management fails to generate and document knowledge because of the limitations of case studies....

  4. Exploitation of cloud computing in management of construction projects in Slovakia

    Directory of Open Access Journals (Sweden)

    Mandičák Tomáš

    2016-12-01

    Full Text Available The issue of cloud computing is a highly topical issue. Cloud computing represents a new model for information technology (IT services based on the exploitation of Web (it represents a cloud and other application platforms, as well as software as a service. In general, the exploitation of cloud computing in construction project management has several advantages, as demonstrated by several research reports. Currently, research quantifying the exploitation of cloud computing in the Slovak construction industry has not yet been carried out. The article discusses the issue of exploitation of cloud computing in construction project management in Slovakia. The main objective of the research is to confirm whether factors such as size of construction enterprise, owner of construction enterprise and participant of construction project have any impact on the exploitation level of cloud computing in construction project management. It includes confirmation of differences in use between different participants of the construction project or between construction enterprises broken down by size and shareholders.

  5. Risk Management in Construction Project: Taking Fairness into Account

    Science.gov (United States)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises

  6. 78 FR 18348 - Submission for OMB Review; Use of Project Labor Agreements for Federal Construction Projects

    Science.gov (United States)

    2013-03-26

    ...: There is no existing Governmentwide data base that collects PLAs and specifically the number submitted... Project Labor Agreements for Federal Construction Projects AGENCY: Department of Defense (DOD), General... information collection requirement regarding Use of Project Labor Agreements for Federal Construction Projects...

  7. Construction of an integrated database to support genomic sequence analysis

    Energy Technology Data Exchange (ETDEWEB)

    Gilbert, W.; Overbeek, R.

    1994-11-01

    The central goal of this project is to develop an integrated database to support comparative analysis of genomes including DNA sequence data, protein sequence data, gene expression data and metabolism data. In developing the logic-based system GenoBase, a broader integration of available data was achieved due to assistance from collaborators. Current goals are to easily include new forms of data as they become available and to easily navigate through the ensemble of objects described within the database. This report comments on progress made in these areas.

  8. Solid waste projection model: Database user's guide (Version 1.0)

    International Nuclear Information System (INIS)

    Carr, F.; Stiles, D.

    1991-01-01

    The Solid Waste Projection Model (SWPM) system is an analytical tool developed by Pacific Northwest Laboratory (PNL) for Westinghouse Hanford Company (WHC) specifically to address Hanford solid waste management issues. This document is one of a set of documents supporting the SWPM system and providing instructions in the use and maintenance of SWPM components. This manual contains instructions for preparing to use Version 1 of the SWPM database, for entering and maintaining data, and for performing routine database functions. This document supports only those operations which are specific to SWPM database menus and functions, and does not provide instructions in the use of Paradox, the database management system in which the SWPM database is established. 3 figs., 1 tab

  9. Solid Waste Projection Model: Database user's guide (Version 1.3)

    International Nuclear Information System (INIS)

    Blackburn, C.L.

    1991-11-01

    The Solid Waste Projection Model (SWPM) system is an analytical tool developed by Pacific Northwest Laboratory (PNL) for Westinghouse Hanford Company (WHC) specifically to address Hanford solid waste management issues. This document is one of a set of documents supporting the SWPM system and providing instructions in the use and maintenance of SWPM components. This manual contains instructions for preparing to use Version 1.3 of the SWPM database, for entering and maintaining data, and for performing routine database functions. This document supports only those operations which are specific to SWPM database menus and functions and does not provide instruction in the use of Paradox, the database management system in which the SWPM database is established

  10. Determinants of construction project success in India

    CERN Document Server

    Jha, Kumar Neeraj

    2013-01-01

    This study presents exploratory work and seeks to identify and evaluate the success and failure factors that could form a guideline for further study and to some extent help professionals to understand some critical aspects that impact project performance concerning construction in India. A total of 55 attributes affecting the performance of construction projects are analysed in terms of their level of influence on four key performance criteria – schedule, cost, quality, and no disputes – using a two-stage questionnaire survey. These attributes are then further analysed, interpreted and evaluated.   Based on the critical success factors obtained from the study, a neural network model-based predictive model for project performance has been developed. The performance prediction models have been derived for all four project performance criteria. Further, a hypothesis that ‘project success’ is influenced by ‘success traits’ has also been formulated. The hypothesized positive inter-relationships betwe...

  11. Client's constraining factors to construction project management ...

    African Journals Online (AJOL)

    This study analyzed client's related factors that constrain project management success of public and private sector construction in Nigeria. Issues that concern clients in any project can not be undermined as they are the owners and the initiators of project proposals. It is assumed that success, failure or abandonment of ...

  12. The construction FACE database - Codifying the NIOSH FACE reports.

    Science.gov (United States)

    Dong, Xiuwen Sue; Largay, Julie A; Wang, Xuanwen; Cain, Chris Trahan; Romano, Nancy

    2017-09-01

    The National Institute for Occupational Safety and Health (NIOSH) has published reports detailing the results of investigations on selected work-related fatalities through the Fatality Assessment and Control Evaluation (FACE) program since 1982. Information from construction-related FACE reports was coded into the Construction FACE Database (CFD). Use of the CFD was illustrated by analyzing major CFD variables. A total of 768 construction fatalities were included in the CFD. Information on decedents, safety training, use of PPE, and FACE recommendations were coded. Analysis shows that one in five decedents in the CFD died within the first two months on the job; 75% and 43% of reports recommended having safety training or installing protection equipment, respectively. Comprehensive research using FACE reports may improve understanding of work-related fatalities and provide much-needed information on injury prevention. The CFD allows researchers to analyze the FACE reports quantitatively and efficiently. Copyright © 2017 Elsevier Ltd and National Safety Council. All rights reserved.

  13. Human Variome Project Quality Assessment Criteria for Variation Databases.

    Science.gov (United States)

    Vihinen, Mauno; Hancock, John M; Maglott, Donna R; Landrum, Melissa J; Schaafsma, Gerard C P; Taschner, Peter

    2016-06-01

    Numerous databases containing information about DNA, RNA, and protein variations are available. Gene-specific variant databases (locus-specific variation databases, LSDBs) are typically curated and maintained for single genes or groups of genes for a certain disease(s). These databases are widely considered as the most reliable information source for a particular gene/protein/disease, but it should also be made clear they may have widely varying contents, infrastructure, and quality. Quality is very important to evaluate because these databases may affect health decision-making, research, and clinical practice. The Human Variome Project (HVP) established a Working Group for Variant Database Quality Assessment. The basic principle was to develop a simple system that nevertheless provides a good overview of the quality of a database. The HVP quality evaluation criteria that resulted are divided into four main components: data quality, technical quality, accessibility, and timeliness. This report elaborates on the developed quality criteria and how implementation of the quality scheme can be achieved. Examples are provided for the current status of the quality items in two different databases, BTKbase, an LSDB, and ClinVar, a central archive of submissions about variants and their clinical significance. © 2016 WILEY PERIODICALS, INC.

  14. [Exploration and construction of the full-text database of acupuncture literature in the Republic of China].

    Science.gov (United States)

    Fei, Lin; Zhao, Jing; Leng, Jiahao; Zhang, Shujian

    2017-10-12

    The ALIPORC full-text database is targeted at a specific full-text database of acupuncture literature in the Republic of China. Starting in 2015, till now, the database has been getting completed, focusing on books relevant with acupuncture, articles and advertising documents, accomplished or published in the Republic of China. The construction of this database aims to achieve the source sharing of acupuncture medical literature in the Republic of China through the retrieval approaches to diversity and accurate content presentation, contributes to the exchange of scholars, reduces the paper damage caused by paging and simplify the retrieval of the rare literature. The writers have made the explanation of the database in light of sources, characteristics and current situation of construction; and have discussed on improving the efficiency and integrity of the database and deepening the development of acupuncture literature in the Republic of China.

  15. Measuring the effects of using ICT/BIM in construction projects

    DEFF Research Database (Denmark)

    Lambrecht, Jan Fuglsig; Vestergaard, Flemming; Karlshøj, Jan

    2016-01-01

    This paper focuses on presenting part of the findings from a research project completed in the period of 2009-2013.The research project was funded by the Danish Building & Property Agency with the primary aim to identify and measure the economic effects of using ICT/BIM in construction projects....... Firstly, this paper presents a conceptual evaluation method developed in order to define and describe how case studies focusing on use of ICT/BIM in construction projects could be completed in order to measure (both quantitatively and qualitatively) the effects achieved from using ICT/BIM in construction...... projects. In this context effects are defined both as tangible and intangible effects (both economically and non-economically) directly and/or indirectly as a consequence of using ICT/BIM in a construction project. Secondly, the paper presents and analyses findings achieved from completing four case...

  16. Construction Project Performance Improvement through Radio Frequency Identification Technology Application on a Project Supply Chain

    Science.gov (United States)

    Wang, Heng

    2017-01-01

    Construction project productivity typically lags other industries and it has been the focus of numerous studies in order to improve the project performance. This research investigated the application of Radio Frequency Identification (RFID) technology on construction projects' supply chain and determined that RFID technology can improve the…

  17. Project Parameter Estimation on the Basis of an Erp Database

    Directory of Open Access Journals (Sweden)

    Relich Marcin

    2013-12-01

    Full Text Available Nowadays, more and more enterprises are using Enterprise Resource Planning (EPR systems that can also be used to plan and control the development of new products. In order to obtain a project schedule, certain parameters (e.g. duration have to be specified in an ERP system. These parameters can be defined by the employees according to their knowledge, or can be estimated on the basis of data from previously completed projects. This paper investigates using an ERP database to identify those variables that have a significant influence on the duration of a project phase. In the paper, a model of knowledge discovery from an ERP database is proposed. The presented method contains four stages of the knowledge discovery process such as data selection, data transformation, data mining and interpretation of patterns in the context of new product development. Among data mining techniques, a fuzzy neural system is chosen to seek relationships on the basis of data from completed projects stored in an ERP system.

  18. Ranking of delay factors in construction projects after Egyptian revolution

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-09-01

    Full Text Available Time is one of the major considerations throughout project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Time delay is a very frequent phenomenon and is almost associated with nearly all constructing projects. However, little effort has been made to curtail the phenomenon, this research work attempts to identify, investigate, and rank factors perceived to affect delays in the Egyptian construction projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, researcher invited practitioners and experts, comprising a statistically representative sample to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of delay factors were identified in construction projects. Totally, ninety-nine (99 factors were short-listed to be made part of the questionnaire survey and were identified and categorized into nine (9 major categories. The survey was conducted with experts and representatives from private, public, and local general construction firms. The data were analyzed using Relative Importance Index (RII, ranking and simple percentages. Ranking of factors and categories was demonstrated according to their importance level on delay, especially after 25/1/2011 (Egyptian revolution. According to the case study results, the most contributing factors and categories (those need attention to delays were discussed, and some recommendations were made in order to minimize and control delays in construction projects. Also, this paper can serve as a guide for all construction parties with effective management in construction projects to achieve a competitive level of quality and a time effective project.

  19. Constructing Benchmark Databases and Protocols for Medical Image Analysis: Diabetic Retinopathy

    Directory of Open Access Journals (Sweden)

    Tomi Kauppi

    2013-01-01

    Full Text Available We address the performance evaluation practices for developing medical image analysis methods, in particular, how to establish and share databases of medical images with verified ground truth and solid evaluation protocols. Such databases support the development of better algorithms, execution of profound method comparisons, and, consequently, technology transfer from research laboratories to clinical practice. For this purpose, we propose a framework consisting of reusable methods and tools for the laborious task of constructing a benchmark database. We provide a software tool for medical image annotation helping to collect class label, spatial span, and expert's confidence on lesions and a method to appropriately combine the manual segmentations from multiple experts. The tool and all necessary functionality for method evaluation are provided as public software packages. As a case study, we utilized the framework and tools to establish the DiaRetDB1 V2.1 database for benchmarking diabetic retinopathy detection algorithms. The database contains a set of retinal images, ground truth based on information from multiple experts, and a baseline algorithm for the detection of retinopathy lesions.

  20. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  1. The communication in industrialised building system (IBS) construction project: Virtual environment

    Science.gov (United States)

    Pozin, Mohd Affendi Ahmad; Nawi, Mohd Nasrun Mohd

    2017-10-01

    Large portion of numbers team organization in the IBS construction sector is known are being fragmented. That is contributed from a segregation of construction activity thus create team working in virtually. Virtual team are the nature when teams are working in distributed area, across culture and time. Therefore, teams can be respond to the task without relocating to the site project and settle down a problem through information and communication technology (ICT). The emergence of virtual team are carry out by advancements in communication technologies as a medium to improve project team communication in project delivery process on IBS construction. Based on literature review from previous study and data collected from interviewing, this paper aim to identified communication challenges among project team members according to current project development practices in IBS construction project. Hence, in attempt to develop effective communication through the advantages of virtual team approach for IBS construction project. In order to ensure the data is gathered comprehensively and accurately, the data was collected from project managers by using semi structured interview method. It was found that virtual team approach could be enable competitive challenges on complexity in the construction project management process.

  2. Portfolio management for investment projects in the construction industry

    Directory of Open Access Journals (Sweden)

    Kozlov Alexander

    2017-01-01

    Full Text Available The Russian business community has realized the need for project/targeted programme management procedures; therefore, the demand for customized project-oriented management methods goes up. In the meantime, this demand is not supplied in full, and the supply is far from being efficient. Project management methodologies need further improvement, including development of portfolio management processes applicable to investment projects developed and implemented in the construction industry. The article considers General approaches to the formalization of the management of portfolios of investment–construction projects. For the main groups of processes portfolio management (“Formation and alignment”, “Monitoring and control” and “Support and development” deals with their constituent sub-processes. The proposed decomposition can be used for both portfolio construction and investment projects and also has an invariant character, which allows extending the proposed approaches to other system target–oriented and project–oriented management.

  3. Streamlined project closeout for construction at KYTC.

    Science.gov (United States)

    2017-09-01

    Project closeout is the period between the end of construction and when a contract is finalized. During closeout, resources are held in encumbered funds intended for the project and in the contractors bonding capacity. Although the Kentucky Transp...

  4. Global Database of Events, Language, and Tone (GDELT Project)

    Data.gov (United States)

    World Wide Human Geography Data Working Group — The Global Database of Events, Language, and Tone (GDELT Project) monitors the world's broadcast, print, and web news from nearly every corner of every country in...

  5. Relationship between time management in construction industry and project management performance

    Science.gov (United States)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  6. Construction project investment control model based on instant information

    Institute of Scientific and Technical Information of China (English)

    WANG Xue-tong

    2006-01-01

    Change of construction conditions always influences project investment by causing the loss of construction work time and extending the duration. To resolve such problem as difficult dynamic control in work construction plan, this article presents a concept of instant optimization by ways of adjustment operation time of each working procedure to minimize investment change. Based on this concept, its mathematical model is established and a strict mathematical justification is performed. An instant optimization model takes advantage of instant information in the construction process to duly complete adjustment of construction; thus we maximize cost efficiency of project investment.

  7. Cost diviation in road construction projects: The case of Palestine

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2012-02-01

    Full Text Available This paper investigates the statistical relationship between actual and estimated cost of road construction projects using data from road construction projects awarded in the West Bank in Palestine over the years 2004–2008. The study is based on a sample of 169 road construction projects. Based on this data, regression models are developed. The findings reveal that 100% of projects suffer from cost diverge, it is found that 76% of projects have cost under estimation while 24% have cost over estimation. The discrepancy between estimated and actual cost has an average of 14.6%, ranging from -39% to 98%. The relation between the project size (length and width and the cost diverge is discussed.

  8. Research on Green Construction Technology Applied at Guangzhou Hongding Building Project

    Science.gov (United States)

    Lou, Yong Zhong

    2018-06-01

    The green construction technology is the embodiment of sustainable development strategy in the construction industry, and it is a new construction mode which requires a higher environmental protection. Based on the Hongding building project, this paper describes the application and innovation of technical in the process of implementing green construction in the project, as well as the difficulties and characteristics in the specific practice; .The economic and social benefits of green construction are compared to the traditional construction model; .The achievements and experience of the green construction technology are summarized in the project; The ideas and methods in the process of implementing green construction are abstracted; some suggestions are put forward for the development of green construction.

  9. Construction of database server system for fuel thermo-physical properties

    International Nuclear Information System (INIS)

    Park, Chang Je; Kang, Kwon Ho; Song, Kee Chan

    2003-12-01

    To perform the evaluation of various fuels in the nuclear reactors, not only the mechanical properties but also thermo-physical properties are required as one of most important inputs for fuel performance code system. The main objective of this study is to make a database system for fuel thermo-physical properties and a PC-based hardware system has been constructed for ease use for the public with visualization such as web-based server system. This report deals with the hardware and software which are used in the database server system for nuclear fuel thermo-physical properties. It is expected to be highly useful to obtain nuclear fuel data without such a difficulty through opening the database of fuel properties to the public and is also helpful to research of development of various fuel of nuclear industry. Furthermore, the proposed models of nuclear fuel thermo-physical properties will be enough utilized to the fuel performance code system

  10. Improvement of Construction Project Management Processes

    Directory of Open Access Journals (Sweden)

    Nazarko, J.

    2017-07-01

    Full Text Available The common denominator of the five papers published in the current edition of the Journal of Engineering, Project, and Production Management is the improvement of construction project management processes for effective use of resources. Execution of proper project management processes is widely recognized as a key success factor influencing likelihood of project success (Alleman, 2014. It is noticeable that four out of five papers in this issue of the Journal are authored or co-authored by Iranian researchers from the same Institute but their conclusions bear importance that cannot be limited to the authors’ region.

  11. Projected beam irradiation at low latitudes using Meteonorm database

    DEFF Research Database (Denmark)

    Hatwaambo, Sylvester; Perers, Bengt; Karlsson, Björn

    2009-01-01

    by a collector provided the projection angle lies within the acceptance angle. The Meteonorm method of calculating solar radiation on any arbitrary oriented surface uses the globally simulated meteorological databases. Meteonorm has become a valuable too for estimating solar radiation where measured solar...... radiation data is missing or irregular. In this paper we present the projected beam solar radiation at low latitudes based on the standard Meteonorm calculations. The conclusion is that there is potential in using solar concentrators at these latitudes since the projected beam radiation is more during...

  12. Identifying Issues in Applying Integrated Project Delivery to Domestic Nuclear Power Plant Construction Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Joo [Korean Nuclear Society, Daejeon (Korea, Republic of)

    2016-05-15

    Integrated Project Delivery (IPD) is defined as that people, systems, business structures, and practices of key stakeholders are incorporated into a single-team, with a single process, which executes a project in a way of optimizing the project's outcome, increasing values delivered to the end user, reducing waste, and maximizing efficiency throughout the phases of engineering to construction. The researcher had carried out literature review in terms of IPD to identify major characteristics of IPD which are presented in the following section and had compared such characteristics against peculiarities of nuclear power plant (NPP) construction projects in order to shed light on obstacles in possible application of IPD method to domestic NPP construction projects in the coming days. In this research, three (3) major characteristics of IPD were identified: 1) key stakeholders signing one balanced contract, forming de facto one body, sharing risk and reward 2) an integrated project team being formed in the early stage of a project and providing input to minimize time and cost loss from rework downstream 3) team members co-locating, having open and direct communication, making decisions on time, and pursuing the success of the project itself.

  13. First progress report on the Japan Endoscopy Database project.

    Science.gov (United States)

    Kodashima, Shinya; Tanaka, Kiyohito; Matsuda, Koji; Fujishiro, Mitsuhiro; Saito, Yutaka; Ohtsuka, Kazuo; Oda, Ichiro; Katada, Chikatoshi; Kato, Masayuki; Kida, Mitsuhiro; Kobayashi, Kiyonori; Hoteya, Shu; Horimatsu, Takahiro; Matsuda, Takahisa; Muto, Manabu; Yamamoto, Hironori; Ryozawa, Shomei; Iwakiri, Ryuichi; Kutsumi, Hiromu; Miyata, Hiroaki; Kato, Mototsugu; Haruma, Ken; Fujimoto, Kazuma; Uemura, Naomi; Kaminishi, Michio; Tajiri, Hisao

    2018-01-01

    The Japan Endoscopy Database (JED) Project was started to develop the world's largest endoscopic database, capture the actual performance of endoscopic practice, and standardize the terminology and fundamental items needed for a clinical and research registry. This paper presents a progress report on the first phase of this project undertaken at eight endoscopic centers in Japan. The list of data items to be collected was drafted by the MSED-J (Minimal Standard Endoscopic Database) subcommittee. These items were aggregated offline by integrating data from two endoscopic filing systems between July 2015 and December 2015. The study population included all patients who underwent esophagogastroduodenoscopy or colonoscopy at all eight centers, patients who underwent enteroscopy at five of the eight centers, and patients who underwent endoscopic retrograde cholangiopancreatography (ERCP) at four of the eight centers. Data collected in this phase included 61 070 endoscopic procedures, of which 40 475 were esophagogastroduodenoscopies, 215 were enteroscopies, 19 204 were colonoscopies, and 1176 were ERCPs. Frequencies of complications were 0.68% for esophagogastroduodenoscopy, 0% for enteroscopy, 0.43% for colonoscopy, and 13.34% for ERCP. In addition, we obtained various data including Helicobacter pylori infection status, past history of endoscopy in patients who underwent enteroscopy or colonoscopy, and degree of difficulty of ERCP, although the frequencies of reporting were sometimes low, with some items <20%. Results of the first phase suggest that the JED project can provide vast quantities of useful data about endoscopic procedures. © 2017 Japan Gastroenterological Endoscopy Society.

  14. A Global Review of Sustainable Construction Project Financing: Policies, Practices, and Research Efforts

    Directory of Open Access Journals (Sweden)

    Ming Shan

    2017-12-01

    Full Text Available Despite the increasing investment in sustainable development over the past decade, a systematic review of sustainable construction project financing is lacking. The objectives of this paper are to conduct a systematic review to examine the policies, practices, and research efforts in the area of sustainable construction project financing, and to explore the potential opportunities for the future research. To achieve these goals, this paper first reviewed the sustainable construction project financing practices implemented by four representative developed economies including the United Kingdom, the United States, Singapore, and Australia. Then, this paper reviewed the efforts and initiatives launched by three international organizations including the United Nations, the Organization for Economic Co-operation and Development, and International Finance Corporation. After that, this paper reviewed the research efforts of sustainable construction project financing published in peer-review journals and books. This paper identified four major research themes within this area, which are the review of financial stakeholders and market of sustainable construction, benefits and barriers to sustainable construction project financing, financial vehicles for sustainable construction projects, innovative models and mechanisms for sustainable construction project financing. Additionally, this paper revealed five directions for the future research of sustainable construction project financing, which are the identification of financial issues in sustainable construction projects, the investigation of financial vehicles for sustainable construction projects in terms of their strengths, limitations, and performances, the examination of critical drivers for implementing sustainable construction project financing, the development of a knowledge-based decision support system for implementing sustainable construction financing, and the development of best practices for

  15. The Problem with the Delta Cost Project Database

    Science.gov (United States)

    Jaquette, Ozan; Parra, Edna

    2016-01-01

    The Integrated Postsecondary Education System (IPEDS) collects data on Title IV institutions. The Delta Cost Project (DCP) integrated data from multiple IPEDS survey components into a public-use longitudinal dataset. The DCP Database was the basis for dozens of journal articles and a series of influential policy reports. Unfortunately, a flaw in…

  16. 3D DIGITAL MODEL DATABASE APPLIED TO CONSERVATION AND RESEARCH OF WOODEN CONSTRUCTION IN CHINA

    Directory of Open Access Journals (Sweden)

    Y. Zheng

    2013-07-01

    Full Text Available Protected by the Tai-Hang Mountains, Shanxi Province, located in north central China, is a highly prosperous, densely populated valley and considered to be one of the cradles of Chinese civilization. Its continuous habitation and rich culture have given rise to a large number of temple complexes and pavilions. Among these structures, 153 can be dated as early as from the Tang dynasty (618- 907C.E. to the end of the Yuan dynasty (1279–1368C.E. in Southern Shanxi area. The buildings are the best-preserved examples of wooden Chinese architecture in existence, exemplifying historic building technology and displaying highly intricate architectural decoration and detailing. They have survived war, earthquakes, and, in the last hundred years, neglect. In 2005, a decade-long conservation project was initiated by the State Administration of Cultural Heritage of China (SACH to conserve and document these important buildings. The conservation process requires stabilization, conservation of important features, and, where necessary, partial dismantlement in order to replace unsound structural elements. Project team of CHCC have developed a practical recording system that created a record of all building components prior to and during the conservation process. After that we are trying to establish a comprehensive database which include all of the 153 earlier buildings, through which we can easily entering, browse, indexing information of the wooden construction, even deep into component details. The Database can help us to carry out comparative studies of these wooden structures, and, provide important support for the continued conservation of these heritage buildings. For some of the most important wooden structure, we have established three-dimensional models. Connected the Database with 3D Digital Model based on ArcGIS, we have developed 3D Digital Model Database for these cherish buildings. The 3D Digital Model Database helps us set up an integrate

  17. Delay factors in failed construction projects in southwestern Nigeria ...

    African Journals Online (AJOL)

    This study was carried out with a view to showing the contribution of delay factors in the overall consideration of failed construction projects in south western Nigeria. This is considered necessary because the traditional view of construction project failure as consisting mainly of structural or functional failures tends to excuse ...

  18. Construction of hydroelectric project generation: Focuses of the option value

    International Nuclear Information System (INIS)

    Villegas P, Clara Ines

    2002-01-01

    Work present work aims at the development of an analysis, that using the option value approach allows finding the optimal moment (from the environmental point of view), for the construction of an electrical project generation in a zone with determined environmental characteristics. The construction of the project, constitutes an irreversible decision and with uncertainty associated. The evolution of the environmental damage of the zone can be attracting through the variable C of environmental damage. The analysis developed here allows the characterization of a rule (or a barrier of environmental damage called C, which determines when, is optimal to construct the generation project or to conserve the ecosystems of the zone of location. Over this barrier, the construction of the project becomes optimal and below her the conservation of the ecosystems of the zone is privileged

  19. Assessing the costs attributed to project delay during project pre-construction stages.

    Science.gov (United States)

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  20. The S-curve for forecasting waste generation in construction projects.

    Science.gov (United States)

    Lu, Weisheng; Peng, Yi; Chen, Xi; Skitmore, Martin; Zhang, Xiaoling

    2016-10-01

    Forecasting construction waste generation is the yardstick of any effort by policy-makers, researchers, practitioners and the like to manage construction and demolition (C&D) waste. This paper develops and tests an S-curve model to indicate accumulative waste generation as a project progresses. Using 37,148 disposal records generated from 138 building projects in Hong Kong in four consecutive years from January 2011 to June 2015, a wide range of potential S-curve models are examined, and as a result, the formula that best fits the historical data set is found. The S-curve model is then further linked to project characteristics using artificial neural networks (ANNs) so that it can be used to forecast waste generation in future construction projects. It was found that, among the S-curve models, cumulative logistic distribution is the best formula to fit the historical data. Meanwhile, contract sum, location, public-private nature, and duration can be used to forecast construction waste generation. The study provides contractors with not only an S-curve model to forecast overall waste generation before a project commences, but also with a detailed baseline to benchmark and manage waste during the course of construction. The major contribution of this paper is to the body of knowledge in the field of construction waste generation forecasting. By examining it with an S-curve model, the study elevates construction waste management to a level equivalent to project cost management where the model has already been readily accepted as a standard tool. Copyright © 2016 Elsevier Ltd. All rights reserved.

  1. Quality planning in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    The purpose of this paper is to investigate deeper on the factors that contribute to the effectiveness of quality planning, identifying the common problems encountered in quality planning, practices and ways for improvements in quality planning for construction projects. This paper involves data collected from construction company representatives across Malaysia that are obtained through semi-structured interviews as well as questionnaire distributions. Results shows that design of experiments (average index: 4.61), inspection (average index: 4.45) and quality audit as well as other methods (average index: 4.26) rank first, second and third most important factors respectively.

  2. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  3. Mapping of information and identification of construction waste at project life cycle

    Science.gov (United States)

    Wibowo, Mochamad Agung; Handayani, Naniek Utami; Nurdiana, Asri; Sholeh, Moh Nur; Pamungkas, Gita Silvia

    2018-03-01

    The development of construction project towards green construction is needed in order to improve the efficiency of construction projects. One that needs to be minimized is construction waste. Construction waste is waste generated from construction project activities, both solid waste and non solid waste. More specifically, the waste happens at every phase of the project life cycle. Project life cycle are the stage of idea, design, construction, and operation/maintenance. Each phase is managed by different stakeholders. Therefore it requires special handling from the involved stakeholders. The objective of the study is to map the information and identify the waste at each phase of the project life cycle. The purpose of mapping is to figure out the process of information and product flow and with its timeline. This mapping used Value Stream Mapping (VSM). Identification of waste was done by distributing questionnaire to respondents to know the waste according to owner, consultant planner, contractor, and supervisory consultant. The result of the study is the mapping of information flow and product flow at the phases of idea, design, construction, and operation/ maintenance.

  4. Standardisation of an European end-user nutrient database for nutritional epidemiology: what can we learn from the EPIC Nutrient Database (ENDB) project?

    DEFF Research Database (Denmark)

    Slimani, N.; Deharveng, G.; Unwin, I.

    2007-01-01

    the absence of a reference European nutrient database for international nutritional epidemiology studies, the EPIC Nutrient Database (ENDB) project has been set up to standardise nutrient databases (NDBs) across 10 European countries participating in the EPIC study. This paper reports the main...... problems in harmonising NDBs experienced by end-user in the ENDB project and the solutions adopted to prevent and minimize them, which are also relevant for other large European nutritional studies. Furthermore, it provides end-user recommendations for improving the comparability of European and other NDBs...

  5. Identifying and managing risk in international construction projects

    Directory of Open Access Journals (Sweden)

    Sachin Kerur

    2012-04-01

    Full Text Available Over the last decade, major construction projects have increasingly arisen in countries or regions that lack specialist, expert construction contractors, suppliers and consultants. Steps are being taken by governments in the Middle East, Eastern Europe, China, India and developing markets to address national infrastructure deficits, and by so doing, are creating new regions of booming construction demand. When coupled with anaemic growth in developed markets such as the United Kingdom, the USA and Western Europe, foreign markets present attractive opportunities to the global construction industry. However, foreign markets are littered with the cautionary tales of international contractors and consultants that have failed to grasp the intricacies and risks of operating in a new environment and have failed to capitalise on the opportunities available. By identifying the classes of risks, and undertaking detailed analysis, ranking and mitigation of relevant jurisdictional risks, participants in international construction projects will increase the likelihood of project success and commercial longevity in the new jurisdiction. Risk identification and assessment is not a science but an art, and while there are many potential approaches to the issue, we propose that our strategies for identifying, assessing, ranking and mitigating jurisdictional risks offer new international players a good chance of commercial success.

  6. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    Science.gov (United States)

    Lawrence N. Hudson; Joseph Wunderle M.; And Others

    2016-01-01

    The PREDICTS project—Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)—has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of human impacts relating to land use. We have used this evidence base to...

  7. Impact of Construction Health & Safety Regulations on Project ...

    African Journals Online (AJOL)

    Impact of Construction Health & Safety Regulations on Project Parameters in Nigeria: Consultants and Contractors View. ... The study recommends that better attention is given to health and safety should as a project parameter and that related practice notes and guidelines should be evolved for all project stakeholders.

  8. Financial and organizational models of NPP construction projects

    International Nuclear Information System (INIS)

    Ivanov, Timur

    2010-01-01

    The recent evolution of financial and organizational models of NPP projects can be truly reputed to open a new page of the world market of NPP construction. The definition of the concrete model is based mostly on specific cooperation backgrounds and current terms and conditions under which the particular NPP project is being evolved. In this article the most commonly known strategies and schemes of financing structuring for export NPP construction projects are scrutinized. Special attention is paid to the analysis of BOO/BOT models which are based on the public-private partnership. Most BOO/BOT projects in the power sector has Power Purchase Agreements (PPA) as an integral part of them. The PPA key principles are studied here as well. The flexibility and adaptability of the public-private partnership models for financing and organization of the NPP projects contributes substantially to the competitiveness of the NPP projects especially under current economic conditions. (orig.)

  9. Construction and analysis of a microsatellite-based database of european wheat varieties

    NARCIS (Netherlands)

    Röder, M.S.; Wendehake, K.; Korzun, V.; Bredemeijer, G.; Laborie, D.; Bertrand, L.; Isaac, P.; Vosman, B.

    2002-01-01

    A database of 502 recent European wheat varieties, mainly of winter type, was constructed using 19 wheat microsatellites and one secalin-specific marker. All datapoints were generated in at least two laboratories using different techniques for fragment analysis. An overall level of >99.5ccuracy

  10. Final status of the salt repository project waste package program experimental database

    International Nuclear Information System (INIS)

    Thornton, B.M.; Reimus, P.W.

    1988-03-01

    This report describes the final status of the Salt Repository Project Waste Package Program Experimental Database. The data base serves as a clearinghouse for all data collected within the Waste Package Program (WPP) and its predecessor programs at Pacific Northwest Laboratory (PNL). The database was maintained using RS/1 database management software. Documented assurance that the entries in the database were consistent with experimental records was provided by having each experimentalist inspect the entries and signify that they were in agreement with the records. The inspection and signoff were done per PNL technical procedures. Data for which it was impossible to obtain the experimentalist's inspection and signature were segregated from the rest of the database, although they could still be accessed by WPP staff. The WPPED contains two groups of subdirectories. One group contains data taken prior to the installation of quality assurance procedures at PNL. The other group of subdirectories contains data taken under the NQA-1 procedures since their installation in April 1985. As part of closeout activities in the Salt Repository Project, the WPP database has been archived onto magnetic media. The data in the database are available by request on magnetic media or in hardcopy form. 2 refs

  11. Modelling of project cash flow on construction projects in Malang city

    Science.gov (United States)

    Djatmiko, Bambang

    2017-09-01

    Contractors usually prepare a project cash flow (PCF) on construction projects. The flow of cash in and cash out within a construction project may vary depending on the owner, contract documents, and construction service providers who have their own authority. Other factors affecting the PCF are down payment, termyn, progress schedule, material schedule, equipment schedule, manpower schedules, and wages of workers and subcontractors. This study aims to describe the cash inflow and cash outflow based on the empirical data obtained from contractors, develop a PCF model based on Halpen & Woodhead's PCF model, and investigate whether or not there is a significant difference between the Halpen & Woodhead's PCF model and the empirical PCF model. Based on the researcher's observation, the PCF management has never been implemented by the contractors in Malang in serving their clients (owners). The research setting is in Malang City because physical development in all field and there are many new construction service providers. The findings in this current study are summarised as follows: 1) Cash in included current assets (20%), owner's down payment (20%), termyin I (5%-25%), termyin II (20%), termyin III (25%), termyin IV (25%) and retention (5%). Cash out included direct cost (65%), indirect cost (20%), and profit + informal cost(15%), 2)the construction work involving the empirical PCF model in this study was started with the funds obtained from DP or current assets and 3) The two models bear several similarities in the upward trends of direct cost, indirect cost, Pro Ic, progress billing, and S-curve. The difference between the two models is the occurrence of overdraft in the Halpen and Woodhead's PCF model only.

  12. M.S. independent research study : partnering on small construction project

    OpenAIRE

    Conley, Michael A

    1997-01-01

    This investigation will address the possibility that partnering concepts are underutilized in small government projects. If Government Contracting Officers utilized partnering concepts on small construction projects, there could be a potential for saving millions of dollars annually. The primary objective of this report is to inform Contracting Officers of the benefits of partnering on small construction projects. Small projects will be considered to have a value of less than $3 million, mid-...

  13. A survey of the use of database management systems in accelerator projects

    CERN Document Server

    Poole, John

    1995-01-01

    The International Accelerator Database Group (IADBG) was set up in 1994 to bring together the people who are working with databases in accelerator laboratories so that they can exchange information and experience. The group now has members from more than 20 institutes from all around the world, representing nearly double this number of projects. This paper is based on the information gathered by the IADBG and describes why commercial DataBase Management Systems (DBMS) are being used in accelerator projects and what they are being used for. Initially introduced to handle equipment builders' data, commercial DBMS are now being used in almost all areas of accelerators from on-line control to personnel data. A variety of commercial systems are being used in conjunction with a diverse selection of application software for data maintenance/manipulation and controls. This paper reviews the database activities known to IADBG.

  14. Three Construction Projects with Wood Scraps

    Science.gov (United States)

    Levine, Elizabeth

    1977-01-01

    Wood, a natural material, appeals to children of all ages. Wood construction allows children the flexibility of moving parts of their work around until they are satisfied with the arrangement. Three projects are described. (Author/RK)

  15. A Systematic Approach to Modelling Change Processes in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ibrahim Motawa

    2012-11-01

    Full Text Available Modelling change processes within construction projects isessential to implement changes efficiently. Incomplete informationon the project variables at the early stages of projects leads toinadequate knowledge of future states and imprecision arisingfrom ambiguity in project parameters. This lack of knowledge isconsidered among the main source of changes in construction.Change identification and evaluation, in addition to predictingits impacts on project parameters, can help in minimising thedisruptive effects of changes. This paper presents a systematicapproach to modelling change process within construction projectsthat helps improve change identification and evaluation. Theapproach represents the key decisions required to implementchanges. The requirements of an effective change processare presented first. The variables defined for efficient changeassessment and diagnosis are then presented. Assessmentof construction changes requires an analysis for the projectcharacteristics that lead to change and also analysis of therelationship between the change causes and effects. The paperconcludes that, at the early stages of a project, projects with a highlikelihood of change occurrence should have a control mechanismover the project characteristics that have high influence on theproject. It also concludes, for the relationship between changecauses and effects, the multiple causes of change should bemodelled in a way to enable evaluating the change effects moreaccurately. The proposed approach is the framework for tacklingsuch conclusions and can be used for evaluating change casesdepending on the available information at the early stages ofconstruction projects.

  16. Factors causing cost variation for constructing wastewater projects in Egypt

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Cost is one of the major considerations throughout the project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Despite its proven importance, it is common to see a construction project failing to achieve its objectives within the specific cost. Cost variation is a very frequent phenomenon and is almost associated with nearly constructing all wastewater projects. Maintaining steady cost projection on wastewater projects had been recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial cost plan had been prevalent on construction sites. However, little or no effort has been made to curtail the phenomenon, this research work attempts to identify, investigate and rank factors perceived to affect cost variation in the Egyptian wastewater projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, author invited practitioners and experts, comprising a statistically representative sample, to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of cost variation factors were identified for constructing wastewater projects. Totally 52 factors were short-listed to be made part of the questionnaire survey and the survey was conducted with experts and representatives from private, public and local general construction firms. The data were analyzed using Relative Importance Index, ranking and simple percentages. It was analytically discovered that factors such as: (1 Lowest bidding procurement method; (2 Additional work; (3 Bureaucracy in bidding/tendering method; (4 Wrong method of cost estimation; and (5 Funding problems were critical for causing cost variation, while (1 Inaccurate cost estimation; (2 Mode of financing and payment for completed work; (3 Unexpected ground

  17. Computer-Aided Systems Engineering for Flight Research Projects Using a Workgroup Database

    Science.gov (United States)

    Mizukami, Masahi

    2004-01-01

    An online systems engineering tool for flight research projects has been developed through the use of a workgroup database. Capabilities are implemented for typical flight research systems engineering needs in document library, configuration control, hazard analysis, hardware database, requirements management, action item tracking, project team information, and technical performance metrics. Repetitive tasks are automated to reduce workload and errors. Current data and documents are instantly available online and can be worked on collaboratively. Existing forms and conventional processes are used, rather than inventing or changing processes to fit the tool. An integrated tool set offers advantages by automatically cross-referencing data, minimizing redundant data entry, and reducing the number of programs that must be learned. With a simplified approach, significant improvements are attained over existing capabilities for minimal cost. By using a workgroup-level database platform, personnel most directly involved in the project can develop, modify, and maintain the system, thereby saving time and money. As a pilot project, the system has been used to support an in-house flight experiment. Options are proposed for developing and deploying this type of tool on a more extensive basis.

  18. Project and Production Management in the Construction Industry

    OpenAIRE

    Chien-Ho Ko

    2012-01-01

    In this issue, the Journal of Engineering, Project, and Production Management (EPPM-Journal) presents five original research papers related to project and production management in the construction industry from authors in Africa, Asia, and Europe.

  19. Evaluation model of project complexity for large-scale construction projects in Iran - A Fuzzy ANP approach

    Directory of Open Access Journals (Sweden)

    Aliyeh Kazemi

    2016-09-01

    Full Text Available Construction projects have always been complex. By growing trend of this complexity, implementations of large-scale constructions become harder. Hence, evaluating and understanding these complexities are critical. Correct evaluation of a project complication can provide executives and managers with good source to use. Fuzzy analytic network process (ANP is a logical and systematic approach toward defining, evaluation, and grading. This method allows for analyzing complex systems, and determining complexity of them. In this study, by taking advantage of fuzzy ANP, effective indexes for development of complications in large-scale construction projects in Iran have been determined and prioritized. The results show socio-political, project system interdependencies, and technological complexity indexes ranked top to three. Furthermore, in comparison of three main huge projects: commercial-administrative, hospital, and skyscrapers, the hospital project had been evaluated as the most complicated. This model is beneficial for professionals in managing large-scale projects.

  20. Alignment between ICT and communication in construction projects

    NARCIS (Netherlands)

    Adriaanse, Adriaan Maria; Voordijk, Johannes T.; Dewulf, Geert P.M.R.

    2004-01-01

    Through rapid advancements in ICT, opportunities arise in enhancing communication between participants of different organisations in construction projects. The use of ICT in construction is, however, relatively limited and ineffective compared to other sectors such as the automotive or the aerospace

  1. Reducing construction waste: A study of urban infrastructure projects.

    Science.gov (United States)

    de Magalhães, Ruane Fernandes; Danilevicz, Ângela de Moura Ferreira; Saurin, Tarcisio Abreu

    2017-09-01

    The construction industry is well-known for producing waste detrimental to the environment, and its impacts have increased with the development process of cities. Although there are several studies focused on the environmental impact of residential and commercial buildings, less knowledge is available regarding decreasing construction waste (CW) generation in urban infrastructure projects. This study presents best practices to reduce waste in the said projects, stressing the role of decision-making in the design stage and the effective management of construction processes in public sector. The best practices were identified from literature review, document analysis in 14 projects of urban infrastructure, and both qualitative and quantitative survey with 18 experts (architects and engineers) playing different roles on those projects. The contributions of these research are: (i) the identification of the main building techniques related to the urban design typologies analyzed; (ii) the identification of cause-effect relationships between the design choices and the CW generation diagnosis; (iii) the proposal of a checklist to support the decision-making process, that can be used as a control and evaluation instrument when developing urban infrastructure designs, focused on the construction waste minimization (CWM). Copyright © 2017 Elsevier Ltd. All rights reserved.

  2. Adoption and Use of Interorganizational ICT in a Construction Project

    NARCIS (Netherlands)

    Adriaanse, Adriaan Maria; Voordijk, Johannes T.; Dewulf, Geert P.M.R.

    2010-01-01

    The objective of this research is to explain why actors are not using interorganizational information and communication technology (ICT) in construction projects in the intended way, by determining the mechanisms that influence the way actors use this ICT over time during a construction project.

  3. Qualitative Approach on Investigating Failure Factors of Yemeni Mega Construction Projects

    OpenAIRE

    Gamil Yaser; Abdul Rahman Ismail; Nagapan Sasitharan; Alemad Nashwan

    2017-01-01

    Large construction projects in Yemen face many impediments and challenges to be completed successfully. This article presents an investigative cases study of three mega construction projects which are considered failed to achieve their assigned plans and objectives. An exploratory interview was implied in this study via telephone to three construction experts who involved directly in these mega projects at the managerial level. Semi-structured questions based on literature were designed as gu...

  4. Causes of Low-Skilled Workers’ Performance in Construction Projects

    Directory of Open Access Journals (Sweden)

    Alhaji Ali Zannah

    2017-06-01

    Full Text Available Skilled workers’ performance is one of the crucial aspects of labour productivity that requires proper attention for effective projects delivery in the construction industry. The level of skilled workers’ low performance has been seen to be a major factor which contributes toward inefficient construction projects productivity. Therefore, the objective of this research is to identify the causes of low-skilled workers’ performance in construction projects in the Nigeria. The objective was achieved through a structured quantitative method of questionnaire distributed to 150 respondents that comprise of active stakeholders in the Nigerian construction industry. 111 responses representing 74 % were retrieved. The data were analysed using descriptive statistics and analysis of variance (ANOVA. The finding shows that; low wages of skilled, lack of sufficient skill acquisition centres and lack of incentive schemes for skilled workers were the most significant causes of low-skilled workers’ performance in the Nigerian construction industry. The homogenous analysis indicates that there are significant differences in perception of respondents on few variables whereas majority of respondents have similarities in most of the variables. The research findings indicate the need for stakeholders in the Nigerian construction industry to provide incentives and motivate skilled workers, provide training and retraining, conducive working condition, supply of quality materials and equipment, and proper site management in order improve low-skilled workers’ performance in Nigerian construction industry towards optimal performance.

  5. The Role of Demonstration Projects in Construction innovation processes

    DEFF Research Database (Denmark)

    Clausen, Lennie

    1999-01-01

    The article is describing the methodology of a case-study approach to the investigation of demonstration projects and their impact on the development of process and product innovations in the construction industry.......The article is describing the methodology of a case-study approach to the investigation of demonstration projects and their impact on the development of process and product innovations in the construction industry....

  6. A study for EVMS application to NPP construction project

    Energy Technology Data Exchange (ETDEWEB)

    Roh, M. S.; Kwak, J. K. [KEPCO, Daejeon (Korea, Republic of)

    2016-05-15

    The earned value project management method integrates three critical elements of project management scope management, cost management and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments, and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. It is also anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages under the globalized market, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners as well as the researchers. In this context, the purpose of this paper is to identify major previously improving activities that characterize the real-world Earned Value Management System (EVMS) implementation for nuclear power plant construction. And several distinct attributes of nuclear power plant construction were also investigated.

  7. A study for EVMS application to NPP construction project

    International Nuclear Information System (INIS)

    Roh, M. S.; Kwak, J. K.

    2016-01-01

    The earned value project management method integrates three critical elements of project management scope management, cost management and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments, and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. It is also anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages under the globalized market, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners as well as the researchers. In this context, the purpose of this paper is to identify major previously improving activities that characterize the real-world Earned Value Management System (EVMS) implementation for nuclear power plant construction. And several distinct attributes of nuclear power plant construction were also investigated

  8. Relational databases for SSC design and control

    International Nuclear Information System (INIS)

    Barr, E.; Peggs, S.; Saltmarsh, C.

    1989-01-01

    Most people agree that a database is A Good Thing, but there is much confusion in the jargon used, and in what jobs a database management system and its peripheral software can and cannot do. During the life cycle of an enormous project like the SSC, from conceptual and theoretical design, through research and development, to construction, commissioning and operation, an enormous amount of data will be generated. Some of these data, originating in the early parts of the project, will be needed during commissioning or operation, many years in the future. Two of these pressing data management needs-from the magnet research and industrialization programs and the lattice design-have prompted work on understanding and adapting commercial database practices for scientific projects. Modern relational database management systems (rDBMS's) cope naturally with a large proportion of the requirements of data structures, like the SSC database structure built for the superconduction cable supplies, uses, and properties. This application is similar to the commercial applications for which these database systems were developed. The SSC application has further requirements not immediately satisfied by the commercial systems. These derive from the diversity of the data structures to be managed, the changing emphases and uses during the project lifetime, and the large amount of scientific data processing to be expected. 4 refs., 5 figs

  9. Construction project of Flamanville 3 NPP. The participation of Iberdrola engineering and Construction

    International Nuclear Information System (INIS)

    Diaz Prada, J. I.; Cubian, B.

    2014-01-01

    Iberdrola Engineering and Construction (IIC) leads several projects mini EPC for the EPR Flamanville 3 NPP for providing important for safety components and auxiliary systems in the pump house and in the turbine island. The realization of this new nuclear project has been a challenge from the technical and organizational perspective because the plant is the first of the new nuclear station (FDAKE) type EPR 1700 MWe series in a highly restrictive environment due to to the large number of particular requirements from the final customer and the meager degree of progress of the design to the date of commencement of construction. (Author)

  10. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Directory of Open Access Journals (Sweden)

    Gafurov Andrey

    2018-01-01

    Full Text Available The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the “Project analysis scenario” flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  11. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Science.gov (United States)

    Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir

    2018-03-01

    The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  12. Construction of a nasopharyngeal carcinoma 2D/MS repository with Open Source XML database--Xindice.

    Science.gov (United States)

    Li, Feng; Li, Maoyu; Xiao, Zhiqiang; Zhang, Pengfei; Li, Jianling; Chen, Zhuchu

    2006-01-11

    Many proteomics initiatives require integration of all information with uniformcriteria from collection of samples and data display to publication of experimental results. The integration and exchanging of these data of different formats and structure imposes a great challenge to us. The XML technology presents a promise in handling this task due to its simplicity and flexibility. Nasopharyngeal carcinoma (NPC) is one of the most common cancers in southern China and Southeast Asia, which has marked geographic and racial differences in incidence. Although there are some cancer proteome databases now, there is still no NPC proteome database. The raw NPC proteome experiment data were captured into one XML document with Human Proteome Markup Language (HUP-ML) editor and imported into native XML database Xindice. The 2D/MS repository of NPC proteome was constructed with Apache, PHP and Xindice to provide access to the database via Internet. On our website, two methods, keyword query and click query, were provided at the same time to access the entries of the NPC proteome database. Our 2D/MS repository can be used to share the raw NPC proteomics data that are generated from gel-based proteomics experiments. The database, as well as the PHP source codes for constructing users' own proteome repository, can be accessed at http://www.xyproteomics.org/.

  13. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    OpenAIRE

    Li, Ming; Wu, Guangdong

    2014-01-01

    Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illus...

  14. Project Structuring and Risk Allocation for NPP Construction

    International Nuclear Information System (INIS)

    Kaser, Greg

    2013-01-01

    This presentation treats of the project risks and how to mitigate major risks and structure a new project. It also talks about the contract implications to handle the specificities of a new project: design complexities, interface between the engineering, procurement and constructing contractors, and finally discusses the necessity of a stable regulatory environment and the role of government

  15. Incentive Model Based on Cooperative Relationship in Sustainable Construction Projects

    Directory of Open Access Journals (Sweden)

    Guangdong Wu

    2017-07-01

    Full Text Available Considering the cooperative relationship between owners and contractors in sustainable construction projects, as well as the synergistic effects created by cooperative behaviors, a cooperative incentive model was developed using game theory. The model was formulated and analyzed under both non-moral hazard and moral hazard situations. Then, a numerical simulation and example were proposed to verify the conclusions derived from the model. The results showed that the synergistic effect increases the input intensity of one party’s resource transfer into the increase of marginal utility of the other party, thus the owner and contractor are willing to enhance their levels of effort. One party’s optimal benefit allocation coefficient is positively affected by its own output efficiency, and negatively affected by the other party’s output efficiency. The effort level and expected benefits of the owner and contractor can be improved by enhancing the cooperative relationship between the two parties, as well as enhancing the net benefits of a sustainable construction project. The synergistic effect cannot lower the negative effect of moral hazard behaviors during the implementation of sustainable construction projects. Conversely, the higher levels of the cooperative relationship, the wider the gaps amongst the optimal values under both non-moral hazard and moral hazard situations for the levels of effort, expected benefits and net project benefits. Since few studies to date have emphasized the effects of cooperative relationship on sustainable construction projects, this study constructed a game-based incentive model to bridge the gaps. This study contributes significant theoretical and practical insights into the management of cooperation amongst stakeholders, and into the enhancement of the overall benefits of sustainable construction projects.

  16. Keeping Track of Our Treasures: Managing Historical Data with Relational Database Software.

    Science.gov (United States)

    Gutmann, Myron P.; And Others

    1989-01-01

    Describes the way a relational database management system manages a large historical data collection project. Shows that such databases are practical to construct. States that the programing tasks involved are not for beginners, but the rewards of having data organized are worthwhile. (GG)

  17. Contracting Economics of Large Engineering and Construction Projects

    NARCIS (Netherlands)

    Berends, T.C.

    2007-01-01

    Large Engineering and Construction Projects (LECPs) form an important area of economic activity, covering a range of different artefacts. These projects have in common that they are massive undertakings, spanning long time periods and they involve large capital investments. Uncertainty and risk are

  18. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ming Li

    2014-01-01

    Full Text Available Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illustrate the robust model, nondominated sorting genetic algorithm-II (NSGA-II is modified to solve the project example. The results show that, by means of adjusting the time and cost robust coefficients, the robust Pareto sets for time-cost tradeoff can be obtained according to different acceptable risk level, from which the decision maker could choose the preferred construction alternative.

  19. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    OpenAIRE

    Hudson, L. N.; Newbold, T.; Contu, S.; Hill, S. L.; Lysenko, I.; De Palma, A.; Phillips, H. R.; Alhusseini, T. I.; Bedford, F. E.; Bennett, D. J.; Booth, H.; Burton, V. J.; Chng, C. W.; Choimes, A.; Correia, D. L.

    2017-01-01

    The PREDICTS project-Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)-has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of human impacts relating to land use. We have used this evidence base to develop global and regional statistical models of how local biodiversity responds to these measures. We describe and make free...

  20. A survey of the use of database management systems in accelerator projects

    OpenAIRE

    Poole, John; Strubin, Pierre M

    1995-01-01

    The International Accelerator Database Group (IADBG) was set up in 1994 to bring together the people who are working with databases in accelerator laboratories so that they can exchange information and experience. The group now has members from more than 20 institutes from all around the world, representing nearly double this number of projects. This paper is based on the information gathered by the IADBG and describes why commercial DataBase Management Systems (DBMS) are being used in accele...

  1. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Log in or Register to get access to full text downloads. ... (decision-making, problem-solving, listening, verbal competency, motivation, persuasion, ... Keywords: Communication skills and leadership model, construction project management, ...

  2. A new framework for construction project definition stage

    DEFF Research Database (Denmark)

    Pikas, Ergo; Oehmen, Josef; Koskela, Lauri

    2018-01-01

    One major reason for the poor performance of construction project delivery is related to the 'ill'- performed project definition stage. The emphasis on rational decision-making and methods have stifled the creativity important to problem structuring and solution generation. Problem is in the poor...

  3. The influence of client brief and change order in construction project

    Science.gov (United States)

    Mahat, N. A. A.; Adnan, H.

    2018-02-01

    Construction briefing is a statement of needs about intentions and projects objectives. Briefing process is the preliminary stage in the design process and successful briefing can achieve project delivery right on target time, cost and quality of project confidently. Although there are many efforts to approach client’s requirement and needs for a project, it is still not collected adequately to make proper solutions in design. Thus, these may lead the client to include change orders during the construction phase. This paper is concerned toward the influence of client’s briefing of a construction project that impact on the change order on the construction works. The research objective is to identify the influence of client’s brief on change orders, therefore, the aims of the research is to reduce change orders in project delivery. This research adopted both qualitative and quantitative data collection methods which are content analysis and semi structure interview. The findings highlight factors contributing to change orders and the essential attributes of clients during the briefing stage that may help minimise them.

  4. Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective

    Science.gov (United States)

    Subramanyam, K.; Haridharan, M. K.

    2017-07-01

    Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.

  5. Architect Critical Challenges as a Project Manager in Construction Projects: A Case Study

    Directory of Open Access Journals (Sweden)

    Mohammadreza Yadollahi

    2014-01-01

    Full Text Available All construction professionals such as civil, mechanical, and electrical engineers, quantity surveyors, and architects have important roles in the construction process. Among these, architects are frequently appointed as a project manager (PM. The role of a PM will drive the success of the projects implementation. Therefore, the capability of an architect as a PM (ArPM is critical in reducing challenges encountered. Accordingly, the identification of these challenges is an important task in selecting an appropriate ArPM. The aim of this study is to identify the most critical challenges faced by an ArPM for construction projects. The data were collected through questionnaires and interviews with architects and professionals in the Malaysian construction industry. Because of the fuzziness and uncertainty of subjective responses, Fuzzy Set Ttheory is applied to identify critical challenges. A total of 65 questionnaires were distributed and 36 questionnaires were returned. The results revealed that the critical challenges faced by an ArPM are “poor planning,” “unfamiliar technology,” “unfamiliarity with green buildings and materials,” “inappropriate scheduling,” and “poor workmanship.” All critical challenges were then categorized into six main groups including technical, managerial, personal skills, contractual, psychological, and financial.

  6. Study on nuclear power plant project construction and management mode in China

    International Nuclear Information System (INIS)

    Wang Kai; Chen Lian

    2009-01-01

    Project management mode plays a key role in project construction, especially in nuclear power field. From the aspects of right, responsibility and benefit, this paper discussed the differences among the common used project management modes. Also the main kinds of the construction management modes used in China's nuclear power plants were summarized. At last, considering the experience of Ningde nuclear power plant, this paper put forward several perspectives about the selection of project management mode in nuclear power plant construction. (authors)

  7. Study on modular construction management in AP1000 nuclear plant project

    International Nuclear Information System (INIS)

    Fang Xiaopeng; Shen Wenrong; Sun Kebin; Wei Zhong

    2010-01-01

    The construction of AP1000 Nuclear Power Plant (NPP) has commenced in China. The AP1000 NPP features a passive design concept and modular construction technology. Based on the management of the construction of current AP1000 NNP, this paper describes the effects on Nuclear Island (NI) construction project management resulting from modular construction technology, as well as new construction techniques and methods. This paper puts forward new requirements for construction schedule management of the nuclear island construction at different levels. The AP1000 NI construction logic features the parallel construction of civil and structural erection as the main approach, with the integrated schedule of module fabrication, assembly and installation as support. The structural modules of AP1000 project are prefabricated in shop, delivered to site as sub-modules and assembled to integrated structural module. The assembled module is transported to the construction site, hoisted and finally set in NI. This paper illustrates how to ensure the construction quality of structural modules by analyzing the interface process and key links in the quality control program, and introduces how to ensure the safety of heavy structural components during various construction phases by evaluating and analyzing the construction safety process. This paper also makes an analysis of the safe environment for the assembly and installation of Containment Vessel, the management of product protection and personnel safety inside the Containment Building during 'Open Top' construction, raises to implement effective protection for the numerous pre-set mechanical modules and equipments, as well as personnel safety protection programs and measures. The modular construction feature of AP1000 NPP design requires technique improvement and management innovation during the NI construction. This paper makes a study and research on the control management of schedule, quality and safety of AP1000 NPP NI

  8. Public private partnership construction project disputes in Nigeria ...

    African Journals Online (AJOL)

    This research examines the possibility of operating a smooth Public Private Partnership (PPP) project for the entire concession period following financial closure, without recourse to litigation or arbitration for settlement of disputes by studying the causes and effects of disputes in construction projects procured in Nigeria ...

  9. Effects of Procurement Related Factors on Construction Project ...

    African Journals Online (AJOL)

    Several Literatures in construction management support the view that procurements have impacts on project performance. Aim of this study is to investigate the effects of procurement related factors of procurement selection criteria, tendering methods and variation orders on project performance. Purpose of the study is to ...

  10. Study of Collaborative Management for Transportation Construction Project Based on BIM Technology

    Science.gov (United States)

    Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng

    2018-03-01

    Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.

  11. Risk Evaluation on UHV Power Transmission Construction Project Based on AHP and FCE Method

    OpenAIRE

    Huiru Zhao; Sen Guo

    2014-01-01

    Ultra high voltage (UHV) power transmission construction project is a high-tech power grid construction project which faces many risks and uncertainty. Identifying the risk of UHV power transmission construction project can help mitigate the risk loss and promote the smooth construction. The risk evaluation on “Zhejiang-Fuzhou” UHV power transmission construction project was performed based on analytic hierarchy process (AHP) and fuzzy comprehensive evaluation (FCE) method in this paper. Afte...

  12. Construction quality assurance program plan for the WIPP project, Carlsbad, NM

    International Nuclear Information System (INIS)

    1987-05-01

    The purpose of this plan is to describe the Quality Assurance (QA) Program to be established and implemented by the US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project Office (WPO) and by the Major Project Participants: the Architect-Engineer (Bechtel), the Construction Manager (US Army Corps of Engineers), the Scientific Advisor (Sandia National Laboratory), and the Management and Operating Contractor (Westinghouse Electric Corporation). This plan addresses the construction, including site evaluation, design, and turnover phases of WIPP. Other work in progress during the same period is controlled by DOE documents applicable to that work effort. The prime responsibility for ensuring the quality of construction rests with the DOE WIPP Project Office and is implemented through the combined efforts of the Construction Manager, the Construction Contractors, the Management and Operating Contractor, and the Architect-Engineer. Inspection and burden of proof of acceptability rests with the Construction Contractor as defined by the technical provisions of the contract and as otherwise specified by the DOE WIPP Project Office on an individual work-package basis. To the maximum extent possible, acceptance of work will be based upon first-hand witnessing by the Construction Manager and other representatives of the DOE organization

  13. Critical Success Factors in Construction Projects (Governmental Projects as a Case Study)

    OpenAIRE

    Hatem Khaleefah Al-Ageeli; Abdul Salam J. Ali Alzobaee

    2016-01-01

    The importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A select...

  14. Decision problems in management of construction projects

    Science.gov (United States)

    Szafranko, E.

    2017-10-01

    In a construction business, one must oftentimes make decisions during all stages of a building process, from planning a new construction project through its execution to the stage of using a ready structure. As a rule, the decision making process is made more complicated due to certain conditions specific for civil engineering. With such diverse decision situations, it is recommended to apply various decision making support methods. Both, literature and hands-on experience suggest several methods based on analytical and computational procedures, some less and some more complex. This article presents the methods which can be helpful in supporting decision making processes in the management of civil engineering projects. These are multi-criteria methods, such as MCE, AHP or indicator methods. Because the methods have different advantages and disadvantages, whereas decision situations have their own specific nature, a brief summary of the methods alongside some recommendations regarding their practical applications has been given at the end of the paper. The main aim of this article is to review the methods of decision support and their analysis for possible use in the construction industry.

  15. THE MODELLING OF ORGANIZATIONAL STRUCTURES OF MANAGEMENT BY REALIZING INVESTMENT CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    Олег Александрович КУЧМА

    2016-03-01

    Full Text Available The authors consider the modeling of organizational structures by virtue of interaction between the basic participants by realizing of investment construction projects. This process is directed at the complex analysis of a problem of quality management by creating of building goods taking into account modern project management tendencies. The topicality of problem is obvious as by realizing of investment construction projects there is a liberal share of uncompleted projects, and in the completed projects actual values considerably exceed budgeted capital expenditures. The introduced model allows managing the project per quality system in all phases of the investment construction project‘s life cycle. It promotes refinement of building goods, improves the rate of successfully completed projects with actual values near budgeted.

  16. A Calabi-Yau database: threefolds constructed from the Kreuzer-Skarke list

    Energy Technology Data Exchange (ETDEWEB)

    Altman, Ross [Department of Physics, Northeastern University,360 Huntington Avenue, Boston, MA 02115 (United States); Gray, James [Physics Department, Robeson Hall, Virginia Tech,850 West Campus Drive, Blacksburg, VA 24061 (United States); He, Yang-Hui [Department of Mathematics, City University,Northampton Square, London, EC1V 0HB (United Kingdom); School of Physics, NanKai University,Tianjin, 300071 (China); Merton College, University of Oxford,Oxford, OX1 4JD (United Kingdom); Jejjala, Vishnu [Centre for Theoretical Physics, NITheP, andSchool of Physics, University of the Witwatersrand,1 Jan Smuts Avenue, Johannesburg, WITS 2050 (South Africa); Nelson, Brent D. [Department of Physics, Northeastern University,360 Huntington Avenue, Boston, MA 02115 (United States); International Center for Theoretical Physics,Strada Costiera 11, Trieste 34014 (Italy)

    2015-02-25

    Kreuzer and Skarke famously produced the largest known database of Calabi-Yau threefolds by providing a complete construction of all 473,800,776 reflexive polyhedra that exist in four dimensions http://arxiv.org/abs/hep-th/0002240. These polyhedra describe the singular limits of ambient toric varieties in which Calabi-Yau threefolds can exist as hypersurfaces. In this paper, we review how to extract topological and geometric information about Calabi-Yau threefolds using the toric construction, and we provide, in a companion online database (see http://nuweb1.neu.edu/cydatabase), a detailed inventory of these quantities which are of interest to physicists. Many of the singular ambient spaces described by the Kreuzer-Skarke list can be smoothed out into multiple distinct toric ambient spaces describing different Calabi-Yau threefolds. We provide a list of the different Calabi-Yau threefolds which can be obtained from each polytope, up to current computational limits. We then give the details of a variety of quantities associated to each of these Calabi-Yau such as Chern classes, intersection numbers, and the Kähler and Mori cones, in addition to the Hodge data. This data forms a useful starting point for a number of physical applications of the Kreuzer-Skarke list.

  17. XML technology planning database : lessons learned

    Science.gov (United States)

    Some, Raphael R.; Neff, Jon M.

    2005-01-01

    A hierarchical Extensible Markup Language(XML) database called XCALIBR (XML Analysis LIBRary) has been developed by Millennium Program to assist in technology investment (ROI) analysis and technology Language Capability the New return on portfolio optimization. The database contains mission requirements and technology capabilities, which are related by use of an XML dictionary. The XML dictionary codifies a standardized taxonomy for space missions, systems, subsystems and technologies. In addition to being used for ROI analysis, the database is being examined for use in project planning, tracking and documentation. During the past year, the database has moved from development into alpha testing. This paper describes the lessons learned during construction and testing of the prototype database and the motivation for moving from an XML taxonomy to a standard XML-based ontology.

  18. Ceramics Technology Project database: September 1991 summary report

    Energy Technology Data Exchange (ETDEWEB)

    Keyes, B.L.P.

    1992-06-01

    The piston ring-cylinder liner area of the internal combustion engine must withstand very-high-temperature gradients, highly-corrosive environments, and constant friction. Improving the efficiency in the engine requires ring and cylinder liner materials that can survive this abusive environment and lubricants that resist decomposition at elevated temperatures. Wear and friction tests have been done on many material combinations in environments similar to actual use to find the right materials for the situation. This report covers tribology information produced from 1986 through July 1991 by Battelle columbus Laboratories, Caterpillar Inc., and Cummins Engine Company, Inc. for the Ceramic Technology Project (CTP). All data in this report were taken from the project`s semiannual and bimonthly progress reports and cover base materials, coatings, and lubricants. The data, including test rig descriptions and material characterizations, are stored in the CTP database and are available to all project participants on request. Objective of this report is to make available the test results from these studies, but not to draw conclusions from these data.

  19. Electric power and the global economy: Advances in database construction and sector representation

    Science.gov (United States)

    Peters, Jeffrey C.

    The electricity sector plays a crucial role in the global economy. The sector is a major consumer of fossil fuel resources, producer of greenhouse gas emissions, and an important indicator and correlate of economic development. As such, the sector is a primary target for policy-makers seeking to address these issues. The sector is also experiencing rapid technological change in generation (e.g. renewables), primary inputs (e.g. horizontal drilling and hydraulic fracturing), and end-use efficiency. This dissertation seeks to further our understanding of the role of the electricity sector as part of the dynamic global energy-economy, which requires significant research advances in both database construction and modeling techniques. Chapter 2 identifies useful engineering-level data and presents a novel matrix balancing method for integrating these data in global economic databases. Chapter 3 demonstrates the relationship between matrix balancing method and modeling results, and Chapter 4 presents the full construction methodology for GTAP-Power, the foremost, publicly-available global computable general equilibrium database. Chapter 5 presents an electricity-detailed computational equilibrium model that explicitly and endogenously captures capacity utilization, capacity expansion, and their interdependency - important aspects of technological substitution in the electricity sector. The individual, but interrelated, research contributions to database construction and electricity modeling in computational equilibrium are placed in the context of analyzing the US EPA Clean Power Plan (CPP) CO 2 target of 32 percent reduction of CO2 emissions in the US electricity sector from a 2005 baseline by 2030. Assuming current fuel prices, the model predicts an almost 28 percent CO2 reduction without further policy intervention. Next, a carbon tax and investment subsidies for renewable technologies to meet the CPP full targets are imposed and compared (Chapter 6). The carbon tax

  20. A conceptual model of psychological contracts in construction projects

    Directory of Open Access Journals (Sweden)

    Yongjian Ke

    2016-09-01

    Full Text Available The strategic importance of relationship style contracting is recognised in the construction industry. Both public and private sector clients are stipulating more integrated and collaborative forms of procurement. Despite relationship and integrated contractual arrangement being available for some time, it is clear that construction firms have been slow to adopt them. Hence it is timely to examine how social exchanges, via unwritten agreement and behaviours, are being nurtured in construction projects. This paper adopted the concept of Psychological Contracts (PC to describe unwritten agreement and behaviours. A conceptual model of the PC is developed and validated using the results from a questionnaire survey administered to construction professionals in Australia. The results uncovered the relationships that existed amongst relational conditions and relational benefits, the PC and the partners’ satisfaction. The results show that all the hypotheses in the conceptual model of the PC are supported, suggesting the PC model is important and may have an effect on project performance and relationship quality among contracting parties. A validated model of the PC in construction was then developed based on the correlations among each component. The managerial implications are that past relationships and relationship characteristics should be taken into account in the selection of procurement partners and the promise of future resources, support and tangible relational outcomes are also vital. It is important for contracting parties to pay attention to unwritten agreements (the PC and behaviours when managing construction projects.

  1. Delays in Building Construction Projects in Ghana

    Directory of Open Access Journals (Sweden)

    Adwoa B Agyakwah-Baah

    2010-07-01

    Full Text Available This study investigates the causes of delay of building construction projects in Ghana to determine the most important according to the key project participants; clients, consultants, and contractors. Thirty-two possible causes of delay were identified from the literature and semi-structured interviews of 15 key players in the implementation process. These delay factors were further categorised into nine major groups. The list of delay causes was subjected to a questionnaire survey for the identification of the most important causes of delay. The field survey included 130 respondents made up of 39 contractors, 37 clients and 54 consultants. The relative importance of the individual causes and the groups were calculated and ranked by their relative importance index. The overall results of the study indicate that the respondents generally agree that financial group factors ranked highest among the major factors causing delay in construction projects in Ghana. The financial group factors were delay in honouring payment certificates, difficulty in accessing credit and fluctuation in prices. Materials group factors are second followed by scheduling and controlling factors.

  2. Transport and Environment Database System (TRENDS): Maritime Air Pollutant Emission Modelling

    DEFF Research Database (Denmark)

    Georgakaki, Aliki; Coffey, R. A.; Lock, G.

    2003-01-01

    This paper reports the development of the maritime module within the framework of the TRENDS project. A detailed database has been constructed, which includes all stages of the energy consumption and air pollutant emission calculations. The technical assumptions and factors incorporated in the da...... ¿ short sea or deep-sea shipping. Key Words: Air Pollution, Maritime Transport, Air Pollutant Emissions......This paper reports the development of the maritime module within the framework of the TRENDS project. A detailed database has been constructed, which includes all stages of the energy consumption and air pollutant emission calculations. The technical assumptions and factors incorporated...... encountered since the statistical data collection was not undertaken with a view to this purpose are mentioned. Examples of the results obtained by the database are presented. These include detailed air pollutant emission results per port and vessel type, to aggregate results for different types of movements...

  3. Management of investment-construction projects basing on the matrix of key events

    Directory of Open Access Journals (Sweden)

    Morozenko Andrey Aleksandrovich

    2016-11-01

    Full Text Available The article considers the current problematic issues in the management of investment-construction projects, examines the questions of efficiency increase of construction operations on the basis of the formation of a reflex-adaptive organizational structure. The authors analyzed the necessity of forming a matrix of key events in the investment-construction project (ICP, which will create the optimal structure of the project, basing on the work program for its implementation. For convenience of representing programs of the project implementation in time the authors make recommendations to consolidate the works into separate, economically independent functional blocks. It is proposed to use an algorithm of forming the matrix of an investment-construction project, considering the economic independence of the functional blocks and stages of the ICP implementation. The use of extended network model is justified, which is supplemented by organizational and structural constraints at different stages of the project, highlighting key events fundamentally influencing the further course of the ICP implementation.

  4. Construction of a nasopharyngeal carcinoma 2D/MS repository with Open Source XML Database – Xindice

    Directory of Open Access Journals (Sweden)

    Li Jianling

    2006-01-01

    Full Text Available Abstract Background Many proteomics initiatives require integration of all information with uniformcriteria from collection of samples and data display to publication of experimental results. The integration and exchanging of these data of different formats and structure imposes a great challenge to us. The XML technology presents a promise in handling this task due to its simplicity and flexibility. Nasopharyngeal carcinoma (NPC is one of the most common cancers in southern China and Southeast Asia, which has marked geographic and racial differences in incidence. Although there are some cancer proteome databases now, there is still no NPC proteome database. Results The raw NPC proteome experiment data were captured into one XML document with Human Proteome Markup Language (HUP-ML editor and imported into native XML database Xindice. The 2D/MS repository of NPC proteome was constructed with Apache, PHP and Xindice to provide access to the database via Internet. On our website, two methods, keyword query and click query, were provided at the same time to access the entries of the NPC proteome database. Conclusion Our 2D/MS repository can be used to share the raw NPC proteomics data that are generated from gel-based proteomics experiments. The database, as well as the PHP source codes for constructing users' own proteome repository, can be accessed at http://www.xyproteomics.org/.

  5. Assessing Environmental Impact Indicators in Road Construction Projects in Developing Countries

    OpenAIRE

    Mohamed Marzouk; Mohamed El-zayat; Ahmed Aboushady

    2017-01-01

    Environmental pollution is considered to be one of the main concerns in the construction industry. Environmental pollution has become a major challenge to construction projects due to the huge amount of pollution caused by construction projects. There are different types of environmental impact indicators, such as the greenhouse gas (GHG) footprint, eutrophication potential (EP), acidification potential (AP), human health (HH) particulate, ozone depletion, and smog. Each of these environmenta...

  6. A Model Suggestion to Predict Leverage Ratio for Construction Projects

    Directory of Open Access Journals (Sweden)

    Özlem Tüz

    2013-12-01

    Full Text Available Due to the nature, construction is an industry with high uncertainty and risk. Construction industry carries high leverage ratios. Firms with low equities work in big projects through progress payment system, but in this case, even a small negative in the planned cash flows constitute a major risk for the company.The use of leverage, with a small investment to achieve profit targets large-scale, high-profit, but also brings a high risk with it. Investors may lose all or the portion of the money. In this study, monitoring and measuring of the leverage ratio because of the displacement in cash inflows of construction projects which uses high leverage and low cash to do business in the sector is targeted. Cash need because of drifting the cash inflows may be seen due to the model. Work should be done in the early stages of the project with little capital but in the later stages, rapidly growing capital need arises.The values obtained from the model may be used to supply the capital held in the right time by anticipating the risks because of the delay in cashflow of construction projects which uses high leverage ratio.

  7. Constructive use of holographic projections

    International Nuclear Information System (INIS)

    Schroer, Bert

    2008-01-01

    Revisiting the old problem of existence of interacting models of QFT with new conceptual ideas and mathematical tools, one arrives at a novel view about the nature of QFT. The recent success of algebraic methods in establishing the existence of factorizing models suggests new directions for a more intrinsic constructive approach beyond Lagrangian quantization. Holographic projection simplifies certain properties of the bulk theory and hence is a promising new tool for these new attempts. (author)

  8. Constructive use of holographic projections

    Energy Technology Data Exchange (ETDEWEB)

    Schroer, Bert [Centro Brasileiro de Pesquisas Fisicas (CBPF), Rio de Janeiro, RJ (Brazil); Institut fuer Theoretische Physik der FU, Berlin (Germany)

    2008-07-01

    Revisiting the old problem of existence of interacting models of QFT with new conceptual ideas and mathematical tools, one arrives at a novel view about the nature of QFT. The recent success of algebraic methods in establishing the existence of factorizing models suggests new directions for a more intrinsic constructive approach beyond Lagrangian quantization. Holographic projection simplifies certain properties of the bulk theory and hence is a promising new tool for these new attempts. (author)

  9. Stakeholders Assessment of Constraints to Project Delivery in the Nigerian Construction Industry

    Directory of Open Access Journals (Sweden)

    Bruno L. Tanko

    2017-01-01

    Full Text Available The central goal of construction stakeholders is to successfully deliver projects to stated objective (s. However, for decades, construction projects have been plagued by perennial constraints of cost and time overruns, poor quality, and lack of sustainability. The objective of this paper is to identify and assess the constraints to construction project delivery, and to recommend solutions to enhance project performance. This paper adopted both quantitative and qualitative methods to establish the constraints in the Nigerian construction industry. A pilot survey and literature reviewed revealed a total of fifty (50 construction constraints, which were further classified into eight (8 major groups. Well-structured questionnaires were administered to construction stakeholders (client, consultant and contractor in Abuja, the federal capital city of Nigeria. Relative Importance Index (RII was used to analyze the data using Likert scale.  The results suggest that cost/time overrun related factors (inability to reduce project cost, Stakeholders interactive-related factors (inability to establish client value system, Client-related factors (Delay in interim payment and finance problem, and Labor/material-related factors (escalation of material prices and materials quality variability are the most prevalent constraints in the Nigerian construction environment.  To mitigate the effects of these challenges, it is suggested that a formal innovative approach should be used by stakeholders to address the problems of poor communication, high project cost, and delay. Clients should also take measures to provide adequate funding and should promptly honor interim certificates.

  10. Delivering construction projects using innovative building technologies

    CSIR Research Space (South Africa)

    Ampofo-Anti, Naalamkai

    2017-07-01

    Full Text Available . Figure 1: IBT delivery flowchart Proceedings 11th Built Environment Conference 6 th August – 8 th August 2017 Delivering construction projects using innovative building technologies Durban, South Africa 5. REFERENCES Ampofo-Anti, N...

  11. Investigational study on construction of the physical function database; Shintai kino data base no kochiku ni kansuru chosa kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    An investigational study was carried out on construction of the physical function database which can supply data useful for planning, design and production when companies provide products and barrier-free environment for the aged society. Up to now, the final image of database was studied as to the visual function. In addition, this study is aimed at constructing the physical function database. In the literature survey, basic data on physical characteristics of the aged which have lain scattered were collected and systematically sorted in relation to the exercise function in order to make an analysis of the data and measuring technology in terms of reliability, importance, and applied values. In the survey of corporate needs, an examination of concrete needs for the exercise function and auditory function was made for general companies and companies related to the medical and welfare apparatus field. As to the visual function, a study was conducted on selection of new items for visual measurement and measuring methods. In the study of the database structure, a pilot database was constructed and subjects were extracted. 529 refs., 57 figs., 15 tabs.

  12. Ceramic Technology Project database: September 1993 summary report

    Energy Technology Data Exchange (ETDEWEB)

    Keyes, B.L.P.

    1994-01-01

    Data presented in this report represent an intense effort to improve processing methods, testing methods, and general mechanical properties of candidate ceramics for use in advanced heat engines. Materials discussed include GN-10, GS-44, GTE PY6, NT-154, NT-164, sintered-reaction-bonded silicon nitrides, silicon nitride combined with rare-earth oxides, NT-230, Hexoloy SX-G1, Dow Corning`s {beta}-Si{sub 3}N{sub 4}, and a few whisker-reinforced ceramic composites. Information in this report was taken from the project`s semiannual and bimonthly progress reports and from final reports summarizing the results of individual studies. Test results are presented in tabular form and in graphs. All data, including test rig descriptions and material characterizations, are stored in the CTP database and are available to all project participants on request. Objective of this report is to make available the test results from these studies but not to draw conclusions from those data.

  13. The impact of project management on nuclear construction lead times

    International Nuclear Information System (INIS)

    Radlaver, M.A.; Bauman, D.S.; Chapel, S.W.

    1985-01-01

    A two-year study of lead times for nuclear power plants found that construction time is affected by six fundamental influences. One of the six is project management. An analysis of construction management teams at 26 nuclear units found that many of the most successful shared five general characteristics: nuclear power experience, skill in project control, adaptability and initiative, commitment to success, and communication and coordination skill

  14. TRIP RATES FOR CONDOMINIUM CONSTRUCTION PROJECT

    Directory of Open Access Journals (Sweden)

    Wirach Hirun

    2015-01-01

    Full Text Available The number of large scale condominium construction projects had dramatically increased in Bangkok. Many projects had occurred in either densely populated areas or in central business districts, where traffic conditions were usually highly congested. To prevent traffic problems, a traffic impact study must be prepared and submitted for review by concerned public authorities. Unit trip generation rates were important data in traffic impact analysis. Without accurate unit trip generation rates, public agencies could not obtain accurate information on the traffic that will be generated. This study aimed to study trip rates and the factors affecting them for condominium construction project in Bangkok. The data were collected from 30 condominium construction sites located in 15 districts of Bangkok. The analysis used the linear regression method and was divided into three cases: 1 trip rates for all vehicles, 2 trip rates for classified vehicles, and 3 trip rates for all types of condominium. All case analyses considered weekdays, Saturday, and Sunday. The results found that trip rates related to the number of dwellings in the condominium. The trip rates for all vehicle types on weekdays, Saturday, and Sunday were 10.636, 4.647, and 9.294 vehicles per 100 dwelling units per day respectively. The trip rates for six-wheeled and ten-wheeled trucks on weekdays, Saturday, and Sunday were 2.046, 0.975, and 0.575 vehicles per 100 dwelling units per day respectively. The trip rate for four-wheeled trucks and passenger cars on weekdays was 1.960. Regarding condominium types, the trip rate for low rise condominiums for all vehicle types on weekdays was 5.315 while the trip rates for high rise condominiums for weekdays, Saturday, and Sunday were 3.965, 2.667, and 1.261 respectively.

  15. Categorization of potential project cost overrun factors in construction industry

    Science.gov (United States)

    Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.

    2018-04-01

    Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.

  16. 42 CFR 137.275 - May Self-Governance Tribes include IHS construction programs in a construction project agreement...

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self-Governance Tribes include IHS construction programs in a construction project agreement or in a funding...

  17. License - Budding yeast cDNA sequencing project | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available List Contact us Budding yeast cDNA sequencing project License to Use This Database Last updated : 2010/02/15 You may use this databas...ional License described below. The Standard License specifies the license terms regarding the use of this database... and the requirements you must follow in using this database. The Additiona...n the Standard License. Standard License The Standard License for this database is the license specified in ...the Creative Commons Attribution-Share Alike 2.1 Japan . If you use data from this database

  18. A project management quality cost information system for the construction industry

    OpenAIRE

    Love, PED; Irani, Z

    2003-01-01

    A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...

  19. Lessons from an enterprise-wide technical and administrative database using CASE and GUI front-ends

    International Nuclear Information System (INIS)

    Chan, A.; Crane, G.; MacGregor, I.; Meyer, S.

    1995-07-01

    An enterprise-wide database built via Oracle*CASE is a hot topic. The authors describe the PEP-II/BABAR Project-Wide Database, and the lessons learned in delivering and developing this system with a small team averaging two and one half people. They also give some details of providing World Wide Web (WWW) access to the information, and using Oracle*CASE and Oracle Forms4. The B Factory at the Stanford Linear Accelerator Center (SLAC) is a project built to study the physics of matter and anti-matter. It consists of two accelerator storage rings (PEP-II) and a detector (BABAR)--a project of approximately $250 million with collaboration by many labs worldwide. Foremost among these lessons is that the support and vision of management are key to the successful design and implementation of an enterprise-wide database. The authors faced the challenge of integrating both administrative and technical data into one CASE enterprise design. The goal, defined at the project's inception in late 1992, was to use a central database as a tool for the collaborating labs to: (1) track quality assurance during construction of the accelerator storage rings and detectors; (2) track down problems faster when they develop; and (3) facilitate the construction process. The focus of the project database, therefore, is on technical data which is less well-defined than administrative data

  20. Cost Based Value Stream Mapping as a Sustainable Construction Tool for Underground Pipeline Construction Projects

    Directory of Open Access Journals (Sweden)

    Murat Gunduz

    2017-11-01

    Full Text Available This paper deals with application of Value Stream Mapping (VSM as a sustainable construction tool on a real construction project of installation of underground pipelines. VSM was adapted to reduce the high percentage of non-value-added activities and time wastes during each construction stage and the paper searched for an effective way to consider the cost for studied construction of underground pipeline. This paper is unique in its way that it adopts cost implementation of VSM to improve the productivity in underground pipeline projects. The data was observed and collected from site during construction, indicating the cycle time, value added and non-value added of each construction stage. The current state was built based on these details. This was an eye-opening exercise and a process management tool as a trigger for improvement. After the current state assessment, a future state is attempted by Value Stream Mapping tool balancing the resources using a Line of Balance (LOB technique. Moreover, a sustainable cost estimation model was developed during current state and future state to calculate the cost of underground pipeline construction. The result shows a cost reduction of 20.8% between current and future states. This reflects the importance of the cost based Value Stream Mapping in construction as a sustainable measurement tool. This new tool could be utilized in construction industry to add the sustainability and effective cost management.

  1. Design of multi-tiered database application based on CORBA component in SDUV-FEL system

    International Nuclear Information System (INIS)

    Sun Xiaoying; Shen Liren; Dai Zhimin

    2004-01-01

    The drawback of usual two-tiered database architecture was analyzed and the Shanghai Deep Ultraviolet-Free Electron Laser database system under development was discussed. A project for realizing the multi-tiered database architecture based on common object request broker architecture (CORBA) component and middleware model constructed by C++ was presented. A magnet database was given to exhibit the design of the CORBA component. (authors)

  2. Grid Databases for Shared Image Analysis in the MammoGrid Project

    CERN Document Server

    Amendolia, S R; Hauer, T; Manset, D; McClatchey, R; Odeh, M; Reading, T; Rogulin, D; Schottlander, D; Solomonides, T

    2004-01-01

    The MammoGrid project aims to prove that Grid infrastructures can be used for collaborative clinical analysis of database-resident but geographically distributed medical images. This requires: a) the provision of a clinician-facing front-end workstation and b) the ability to service real-world clinician queries across a distributed and federated database. The MammoGrid project will prove the viability of the Grid by harnessing its power to enable radiologists from geographically dispersed hospitals to share standardized mammograms, to compare diagnoses (with and without computer aided detection of tumours) and to perform sophisticated epidemiological studies across national boundaries. This paper outlines the approach taken in MammoGrid to seamlessly connect radiologist workstations across a Grid using an "information infrastructure" and a DICOM-compliant object model residing in multiple distributed data stores in Italy and the UK

  3. Environmental impact management during construction of the limestone project

    International Nuclear Information System (INIS)

    Windsor, D.C.

    1988-01-01

    The Limestone Generating Station is being constructed on the Nelson River in Northern Manitoba, and will consist of a 10 unit powerhouse, 5 gate concrete spillway and earthfill dam spanning the 1.5 km width of the Nelson River. Environmental concerns associated with the project included insufficient pre- and post-construction monitoring documenting resources present or magnitude of impacts, impacts on brook trout and lake sturgeon resources, wildlife habitat loss due to construction activities, destruction or disturbance of historic or archaeological sites, degradation of nearby water courses and fish habitat by aggregate removal, in-migration of construction personnel, and various other socio-economic impacts. An overview is provided of monitoring activities and results in the above areas, which involved numerous consultants and government agencies. The project administration and workers did not find the environmental programs, including inspection and enforcement activities, to be onerous or an impediment to the project. On the contrary, the environmental requirements assisted in the general planning for certain activities, and in the general criteria for the conduct of the activities. The work permit process was particularly useful as it defined the requirements of both parties and provided the specific standards necessary determining the acceptability of the activities. 14 refs., 1 fig

  4. Intelligent Materials Tracking System for Construction Projects Management

    Directory of Open Access Journals (Sweden)

    Narimah Kasim

    2015-05-01

    Full Text Available An essential factor adversely affecting the performance of construction projects is the improper handling of materials during site activities. In addition, paper-based reports are mostly used to record and exchange information related to the material components within the supply chain, which is problematic and inefficient. Generally, technologies (such as wireless systems and RFID are not being adequately used to overcome human errors and are not well integrated with project management systems to make tracking and management of materials easier and faster. Findings from a literature review and surveys showed that there is a lack of positive examples of such tools having been used effectively. Therefore, this research focused on the development of a materials tracking system that integrates RFID-based materials management with resources modelling to improve on-site materials tracking. Rapid prototyping was used to develop the system and testing of the system was carried out to examine the functionality and working appropriately. The proposed system is intended to promote the employment of RFID for automatic materials tracking with integration of resource modelling (Microsoft (R Office Project in the project management system in order to establish which of the tagged components are required resources for certain project tasks. In conclusion, the system provides an automatic and easy tracking method for managing materials during materials delivery and inventory management processes in construction projects.

  5. Model for setting priority construction project objectives aligned with ...

    African Journals Online (AJOL)

    participants, including contractors, quantity surveyors, project managers, architects, and ..... (2004: 1) report that the global construction industry is plagued with ..... 1.2. Construction consultant/Developer. 2. 1.2. Engineering. 2. 1.2. Logistics. 2. 1.2 ...... supplychain/PPPFA%20-%20media.pdf> [Accessed: 2 June 2011].

  6. Benefit Evaluation of Implementing BIM in Construction Projects

    Science.gov (United States)

    Chou, Hui-Yu; Chen, Pei-Yu

    2017-10-01

    Since 2014, public construction projects in Taiwan have progressively undertaken steps to promote the use of Building Information Modelling (BIM) technology, the use of BIM has therefore become a necessity for contractors. However, issues such as the high upfront costs relating to software and hardware setup and BIM user training, combined with the difficulties of incorporating BIM into existing workflow operations and management systems, remain a challenge to contractors. Consequently, the benefits stemming from the BIM implementation in turn will affect the activeness and enthusiasm of contractors to implement BIM. While there have been previous studies abroad where the benefits relating to BIM implementation had been calculated and quantified numerically, a benefit evaluation index would require considerations for regional industry practices and characteristics. This study established a benefit evaluation index and method for the implementation of BIM suitable for contractors in Taiwan. The three main principal indexes are: (1) RCR means the effects of reducing costs associated with rework; (2) SDR & DPR mean the effects of mitigating delays that occur due to construction interface coordination or rework, as well as the effects of reducing the penalty costs associated with overdue delivery; (3) AQE means the effects of improving the ability to estimate the amounts of building materials and resources. This study also performed a benefit evaluation calculation of a real world case study construction project using the first two established indexes. The results showed a 0.16% reduction in rework costs, a 6.49% reduction in delays that occur from construction interface coordination or rework, and a 5.0% reduction in penalty costs associated with overdue deliveries. The results demonstrated the applicability of the benefit evaluation index established in this study for real world construction projects.

  7. Project assessment for construction of new nuclear facility

    International Nuclear Information System (INIS)

    2013-01-01

    Project risk management is an important and integral part of project and quality management. It is also a key part of the due diligence process in making informed project decisions where in addition to the qualitative assessments quantitative ones shall be used to the extend practical. As part of the risk management process, risk identification, evaluation and mitigation must be an on-going activity at senior management levels throughout the planning, design, construction and commissioning phases of a new NPP

  8. Improving Construction Process through Integration and Concurrent Engineering

    Directory of Open Access Journals (Sweden)

    Malik Khalfan

    2012-11-01

    Full Text Available In an increasingly competitive business environment, improvedtime-to-market, reduced production cost, quality of the productand customer involvement are rapidly becoming the key successfactors for any product development process. Consequently, mostorganisations are moving towards the adoption of latest technologyand new management concepts and philosophies such as totalquality management and concurrent engineering (CE to bringimprovement in their product development process. This paperdiscusses the adoption of integrated processes and CE withinthe construction industry to enable construction organisations toimprove their project development process. It also discusses aproposed integrated database model for the construction projects,which should enable the construction process to improve, becomemore effective and more efficient.

  9. The Influence of Trust on Project Management Practice within the Construction Industry

    OpenAIRE

    Strahorn, Scott; Brewer, Graham; Gajendran, Thayaparan

    2017-01-01

    Given that any construction project is inherently a human endeavour, it follows that issues of trust are significant in terms of the stakeholder interactions that deliver eventual project outcomes.  Previous research indicates that the relational basis upon which projects are undertaken are intended to influence the likelihood of trusting relationships between stakeholders.  Thus, experiences of trust in a construction project environment are likely to be influenced by the contextual specific...

  10. Applications and Prospects of Modularization Technology in HTR Project Starting from Primary Loop Cavity Construction

    International Nuclear Information System (INIS)

    Yang Guokang; Chen Jing; Huang Wen; Lin Lizhi; Sun Yunlun; Chen Yan; Mao Jiaxin; Wang Yougang; Wang Jinwen; Lin Mingfeng; Yang Mingshan

    2014-01-01

    Primary loop cavity is one of the key areas and major difficulties in HTR-PM project construction. In order to shorten the construction schedule and improve the construction quality, researches on modular design and construction of primary loop cavity has been carried out and the results have been applied in HTR-PM project construction, and got significant application benefit. This paper summarizes the modularization technology application research and project implementation results of primary loop cavity, and analyzes the application and prospects of modularization technology in the HTR project construction. (author)

  11. Collaborative Management of Complex Major Construction Projects: AnyLogic-Based Simulation Modelling

    Directory of Open Access Journals (Sweden)

    Na Zhao

    2016-01-01

    Full Text Available Complex supply chain system collaborative management of major construction projects effectively integrates the different participants in the construction project. This paper establishes a simulation model based on AnyLogic to reveal the collaborative elements in the complex supply chain management system and the modes of action as well as the transmission problems of the intent information. Thus it is promoting the participants to become an organism with coordinated development and coevolution. This study can help improve the efficiency and management of the complex system of major construction projects.

  12. Relational approach in managing construction project safety: a social capital perspective.

    Science.gov (United States)

    Koh, Tas Yong; Rowlinson, Steve

    2012-09-01

    Existing initiatives in the management of construction project safety are largely based on normative compliance and error prevention, a risk management approach. Although advantageous, these approaches are not wholly successful in further lowering accident rates. A major limitation lies with the approaches' lack of emphasis on the social and team processes inherent in construction project settings. We advance the enquiry by invoking the concept of social capital and project organisational processes, and their impacts on project safety performance. Because social capital is a primordial concept and affects project participants' interactions, its impact on project safety performance is hypothesised to be indirect, i.e. the impact of social capital on safety performance is mediated by organisational processes in adaptation and cooperation. A questionnaire survey was conducted within Hong Kong construction industry to test the hypotheses. 376 usable responses were received and used for analyses. The results reveal that, while the structural dimension is not significant, the mediational thesis is generally supported with the cognitive and relational dimensions affecting project participants' adaptation and cooperation, and the latter two processes affect safety performance. However, the cognitive dimension also directly affects safety performance. The implications of these results for project safety management are discussed. Copyright © 2011 Elsevier Ltd. All rights reserved.

  13. Identifying factors causing cost overrun of the construction projects ...

    Indian Academy of Sciences (India)

    Swapnil P Wanjari

    Cost overrun in India; ANOVA; factor analysis; construction projects. 1. Introduction ... gramme Implementation in India [2], projects of public .... case if a respondent never came across of such factor. ..... The co-relation matrix for variables of cost overruns was ..... There are various problems observed due to communication.

  14. Reusing open data for learning database design through project development

    Directory of Open Access Journals (Sweden)

    Jose-Norberto MAZÓN

    2015-12-01

    Full Text Available This paper describes a novel methodology based on reusing open data for applying project-based learning in a Database Design subject of a university degree. This methodology is applied to the ARA (Alto Rendimiento Académico or High Academic Performance group taught in the degree in Computer Engineering at the University of Alicante (Spain during 2012/2013, 2013/2014, and 2014/2015. Openness philosophy implies that huge amount of data is available to students in tabular format, ready for reusing. In our teaching experience, students propose an original scenario where different open data can be reused to a specific goal. Then, it is proposed to design a database in order to manage this data in the envisioned scenario. Open data in the subject helps in instilling a creative and entrepreneur attitude in students, as well as encourages autonomous and lifelong learning. Surveys made to students at the end of each year shown that reusing open data within project-based learning methodologies makes more motivated students since they are using real data.

  15. Determining Success Criteria and Success Factors for International Construction Projects for Malaysian Contractors

    Directory of Open Access Journals (Sweden)

    Ali Mohammed Alashwal

    2017-06-01

    Full Text Available The success of international construction projects is fraught with various challenges such as competitiveness, lack of resources, versatile global economy, and specific conditions in the host country. Malaysian contractors have been venturing into global construction market since early 1980s. However, their venturing was not successful all the time. The number of international projects awarded to Malaysian contractors has reduced drastically during the past decade. Taking advantage of this experience, this paper aims to identify the success criteria and success factors of international construction projects. The data was collected from 120 respondents using a questionnaire survey and analysed using principal component analysis and regression analysis. The results revealed three principal criteria of project success namely, Management Success, Functional Success, and Organisation Success. The main components of success factors include Team Power and Skills, Resource Availability, External Environment, Organisation Capability, Project Support, and Project Organisation. Further analysis emphasized the importance of strong financing capacity of contractors, project social environment, and competence of the project manager in achieving project success. The results of this paper can serve as a guideline for contractors and project managers to achieve success in this context. Future studies may provide in-depth analysis of success criteria and success factors specific for construction project type and host-country location.

  16. A review of risk management process in construction projects of developing countries

    Science.gov (United States)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  17. 3MdB: the Mexican Million Models database

    Science.gov (United States)

    Morisset, C.; Delgado-Inglada, G.

    2014-10-01

    The 3MdB is an original effort to construct a large multipurpose database of photoionization models. This is a more modern version of a previous attempt based on Cloudy3D and IDL tools. It is accessed by MySQL requests. The models are obtained using the well known and widely used Cloudy photoionization code (Ferland et al, 2013). The database is aimed to host grids of models with different references to identify each project and to facilitate the extraction of the desired data. We present here a description of the way the database is managed and some of the projects that use 3MdB. Anybody can ask for a grid to be run and stored in 3MdB, to increase the visibility of the grid and the potential side applications of it.

  18. Towards efficient use of research resources: a nationwide database of ongoing primary care research projects in the Netherlands.

    Science.gov (United States)

    Kortekaas, Marlous F; van de Pol, Alma C; van der Horst, Henriëtte E; Burgers, Jako S; Slort, Willemjan; de Wit, Niek J

    2014-04-01

    PURPOSE. Although in the last decades primary care research has evolved with great success, there is a growing need to prioritize the topics given the limited resources available. Therefore, we constructed a nationwide database of ongoing primary care research projects in the Netherlands, and we assessed if the distribution of research topics matched with primary care practice. We conducted a survey among the main primary care research centres in the Netherlands and gathered details of all ongoing primary care research projects. We classified the projects according to research topic, relation to professional guidelines and knowledge deficits, collaborative partners and funding source. Subsequently, we compared the frequency distribution of clinical topics of research projects to the prevalence of problems in primary care practice. We identified 296 ongoing primary care research projects from 11 research centres. Most projects were designed as randomized controlled trial (35%) or observational cohort (34%), and government funded mostly (60%). Thematically, most research projects addressed chronic diseases, mainly cardiovascular risk management (8%), depressive disorders (8%) and diabetes mellitus (7%). One-fifth of the projects was related to defined knowledge deficits in primary care guidelines. From a clinical primary care perspective, research projects on dermatological problems were significantly underrepresented (P = 0.01). This survey of ongoing projects demonstrates that primary care research has a firm basis in the Netherlands, with a strong focus on chronic disease. The fit with primary care practice can improve, and future research should address knowledge deficits in professional guidelines more.

  19. Web-mediated database for internet-based dental radiology teaching files constructed by 5th-year undergraduate students

    International Nuclear Information System (INIS)

    Kito, Shinji; Wakasugi-Sato, Nao; Matsumoto-Takeda, Shinobu; Oda, Masafumi; Tanaka, Tatsurou; Fukai, Yasuhiro; Tokitsu, Takatoshi; Morimoto, Yasuhiro

    2009-01-01

    To provide oral healthcare for patients of all ages, dental welfare environments and technical aspects of dentistry have evolved and developed and dental education must also diversify. Student-centered voluntary education and establishment of a life-long self-learning environment are becoming increasingly important in the changing world of dental education. In this article, we introduce a new process for the construction of a web-mediated database containing internet-based teaching files on the normal radiological anatomy of panoramic radiographs and CT images of the oral and maxillofacial regions, as well as a system for the delivery of visual learning materials through an intra-faculty local network. This process was developed by our 5th-year undergraduate students. Animated CT scan images were produced using Macintosh Iphoto and Imovie animation software. Normal anatomical images of panoramic radiographs and CT scans were produced using Adobe Illustrator CS and Adobe Photoshop CS. The web database was constructed using Macromedia Dreamweaver MX and Microsoft Internet Explorer. This project was the basis of our participation in the Student Clinician Research Program (SCRP). At Kyushu Dental College, we developed a new series of teaching files on the web. Uploading these teaching files to the internet allowed many individuals to access the information. Viewers can easily select the area of study that they wish to examine. These processes suggest that our laboratory practice is a useful tool for promoting students' motivation and improving life-long self learning in dental radiology. We expect that many medical and dental students, practitioners and patients will be able to use our teaching files to learn about the normal radiological anatomy of the oral and maxillofacial regions.(author)

  20. Communication, coordination and cooperation in construction projects: business environment and human behaviours

    Science.gov (United States)

    Salah Alaloul, Wesam; Shahir Liew, Mohd; Zawawi, Noor Amila Wan

    2017-12-01

    The accomplishment of construction projects is extremely dependent on the integration of several stakeholders; therefore none of them has the control or the ability to accomplish the project alone. Each of them may influence and be influenced by the project management approach. There is no comprehensive theoretical platform for defining Communication, Coordination and Cooperation (3Cs) in the management of construction project. This paper deliberates the function of the 3Cs different theoretical perceptions. Through an analysis of selected articles from reputable academic journals in construction management, the business environment and human behaviour were identified as two main parts. A little has been done so far about the 3Cs, and how they are correlated with construction projects performance. Therefore, the objective of this paper is to explain the definitions and the association between the 3Cs. There is a significant link between communication and coordination. Coordination alternatively, is trust-based a logic of mutual and exchange. Consequently, cooperation is much more sophisticated, which needing more time and attempts.

  1. Construction of the iSTAR international Study of Astronomical Reasoning Database

    Science.gov (United States)

    Slater, S. J.; Tatge, C. B.; Slater, T. F.; Bretones, P. S.; Schleigh, S.

    2016-12-01

    Perhaps more than any other science discipline-based education research field, the scholarly literature base describing and documenting astronomy education research is highly fragmented and widely dispersed across numerous journals. The resulting wide diversity of journals that publish astronomy education research presents an arduous challenge for scholars trying to best understand what work has been done and what work still needs to be done. Moreover, a vast amount of education research on the teaching and learning of astronomy exists in dissertations that were never published and even more exists in the realm of un-disseminated grey literature hosted in conference proceedings and society newsletters going back decades. With a few notable exceptions far less extensive than the current project, there has been no comprehensive repository for cataloging astronomy education research methods and results to date. In response, an international cadre of scholars coordinated by the CAPER Center for Astronomy & Physics Education Research are creating the underlying structure for an online database in order to conduct an international Study of Astronomy Reasoning, iSTAR, project. The online iSTAR database serves as an online host to bring together in one place digital copies of hard to locate journal articles, isolated dissertations and theses, and professional meeting contributions to extend the world's scholars abilities to more easily find and utilize a far broader collection of astronomy education research literature than has been previously available. Works are categorized by research method, nature of study-participants, educational learning venue studied, country and language of the study, and other fruitfully useful categories. Scholars wishing to add their own literature resources are encouraged to contribute to the online database located at istardatabase.org

  2. Critical Causes and Consequences of Construction Project Interruption: Client, Contractor, Consultant and External Factors Standpoints

    Directory of Open Access Journals (Sweden)

    Nurbasirah Mohamed Alias

    2013-09-01

    Full Text Available It should be pointed out that the dilemma of interruption and stoppage in the construction industry is a large-scale trend. Construction interruption and stoppage is considered one of the most recurring problems in the construction industry. Construction Interruption and stoppage is always measured as costly to all parties concerned in the projects and very often it will result in clash, claims, total desertion and much difficult for the feasibility and it slows the growth of construction sector. The objective of the research work that underpins this paper was to investigate the Factors and Consequences of construction projects on local contractors. A construction project is commonly acknowledged as successful when the aim of the project is achieved in terms of predetermined objectives that are mainly completed the project on time, within budget and specified quality in accordance with the specifications and to stakeholders’ satisfaction. One of the most important problems that may arise in the construction project is delays and the magnitude of these delays varies considerably from project to project. According to delay categories that were contractor related, client related, consultant related, labour related and external related, the study revealed the six major effects of delay that were time overrun, cost overrun, dispute, arbitration, total abandonment, and litigation.

  3. Spent nuclear fuel project cold vacuum drying facility supporting data and calculation database

    International Nuclear Information System (INIS)

    IRWIN, J.J.

    1999-01-01

    This document provides a database of supporting calculations for the Cold Vacuum Drying Facility (CVDF). The database was developed in conjunction with HNF-SD-SNF-SAR-002, ''Safety Analysis Report for the Cold Vacuum Drying Facility'', Phase 2, ''Supporting Installation of Processing Systems'' (Garvin 1998). The HNF-SD-SNF-DRD-002, 1997, ''Cold Vacuum Drying Facility Design Requirements'', Rev. 2, and the CVDF Summary Design Report. The database contains calculation report entries for all process, safety and facility systems in the CVDF, a general CVD operations sequence and the CVDF System Design Descriptions (SDDs). This database has been developed for the SNFP CVDF Engineering Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved

  4. Identification of risk factors affecting construction of projects: The case of emerging economy

    Directory of Open Access Journals (Sweden)

    Chipo Mellania Maseko

    2017-12-01

    Full Text Available Controlling project risks has become a daunting task in construction and this can be attributed to issues such as the nature of modern projects. The challenge is that risk appears unannounced at any project phase for various reasons and thereby affecting the performance and the success of unprepared projects. The current studies that explored risk matters include Pehlivan and Öztemir (2015, Katre, and Ghaitidak (2016 amongst others. However, there is absence of unanimity from these studies on risk factors in construction. Thus, this article was instigated in order to identify and classify risk factors that affect the chances of project success. The research methodology selected for this article comprised of peer-reviewed articles between the periods of 2007 to 2017. This approach involved a comprehensive scrutiny into scholarly articles to comprehend risks in construction projects. Following a conceptual analysis, eighty factors were identified and classified under the following; technical, construction, financial, socio-political, physical, organisational, and environmental and other risks. From these categories, political instability was, found to be the most influential risk factor in construction projects and this factor was classified within the socio-political category and this category has total of 11 factors. Finding suggests the need for further empirical study.

  5. INFORMATION MODELING OF LIFE CYCLE OF HIGH-RISE CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    Gusakova Elena Aleksandrovna

    2018-02-01

    Full Text Available To date, many years’ experience in the construction and operation of high-rise buildings has been accumulated. Its analysis reveals not only the engineering and organizational-technological specifics of such projects, but also systemic gaps in the field of management. In the implementation of large-scale and unique projects for high-rise buildings, the problems and tasks of improving approaches to managing the full life cycle of projects and methods, which will improve their competitiveness, become topical. The systems being used have largely exhausted their resource efficiency, which is associated with automation of traditional “inherited” processes and management structures, as well as development of IT-systems focused on digitalization of the activities of construction company, rather than the project. To solve these problems, it is proposed to carry out: reengineering of the schemes of information interaction between the project’s participants; formation of integrated digital environment for the life cycle of the project; development of systems for integrating data management and project management. Subject: problems, approaches and methods of digitalization of project’s life cycle management in relation to the specifics and features of high-rise buildings. Research objectives: substantiation of the most perspective approaches and methods of information modeling of high-rise construction as the basis for managing the full life cycle of the given project. Materials and methods: the experience of digitalization of design, construction, operation and development of high-rise buildings, presented in specialized literature, is analyzed. The methods for integrating information models of various stages of project’s life cycle and for information interaction of project’s participants are considered. Results: the concept of forming a single digital environment for the project is proposed, taking into account the features of the life

  6. Evaluating construction projects of hotels based on environmental sustainability with MCDM framework

    Directory of Open Access Journals (Sweden)

    Sarfaraz Hashemkhani Zolfani

    2018-03-01

    Full Text Available Environmental issues have got incredible attention among daily life activities. Sustainability penetrated in all society practices specially construction industry due to its substantial impact on the environment. Monitoring and controlling architectural project contains a decision problem with multi-varieties analysis. This study aimed to evaluate construction projects of hotels regarding environmental sustainability. To this end, a hybrid Multiple Criteria Decision Making (MCDM model is proposed. Step‐wise Weight Assessment Ratio Analysis (SWARA and Complex proportional assessment (COPRAS compose a unified framework. A private construction project is supposed as a case study. The project is based on establishing a five star hotel in Tehran, Iran. In this research SWARA produces criteria weights and COPRAS will rank decision alternatives. This study can be a strategic route for other similar researches in other fields. Keywords: Architecture projects, Sustainability, Environmental sustainability, SWARA, COPRAS

  7. Construction of the Database for Tomorrow's Regulatory Activities

    International Nuclear Information System (INIS)

    Lee, Il S.; Kim, Min C.; Kim, Sang J.; Yu, Seon O.; Lee, Kyung W.; Kim, Ji T.; Koo, Bon H.; Lee, Durk H.

    2010-01-01

    KINS has launched a top brand project since early 2007, which called the 'Tracking System for the Implementation of Nuclear Regulation: RTRACER' The one of main contents of RTRACER is promoting nuclear safety by interconnecting the information of the events and that of safety review and regulatory inspection. R-TRACER is composed of three parts. One is the CATS(Corrective Action Tracking System) to carry out the related affairs and to exchange information between organizations concerned efficiently. Another is the SIMS(Safety Issue Management System) to coordinate the safety issues program and to implement the operating experience feedback in a real-time basis. And the other is the DIOS to supply above both systems with core information. This paper is focused on the database structure of the DIOS

  8. The KTOI Ecosystem Project Relational Database : a Report Prepared by Statistical Consulting Services for KTOI Describing the Key Components and Specifications of the KTOI Relational Database.

    Energy Technology Data Exchange (ETDEWEB)

    Shafii, Bahman [Statistical Consulting Services

    2009-09-24

    Data are the central focus of any research project. Their collection and analysis are crucial to meeting project goals, testing scientific hypotheses, and drawing relevant conclusions. Typical research projects often devote the majority of their resources to the collection, storage and analysis of data. Therefore, issues related to data quality should be of foremost concern. Data quality issues are even more important when conducting multifaceted studies involving several teams of researchers. Without the use of a standardized protocol, for example, independent data collection carried out by separate research efforts can lead to inconsistencies, confusion and errors throughout the larger project. A database management system can be utilized to help avoid all of the aforementioned problems. The centralization of data into a common relational unit, i.e. a relational database, shifts the responsibility for data quality and maintenance from multiple individuals to a single database manager, thus allowing data quality issues to be assessed and corrected in a timely manner. The database system also provides an easy mechanism for standardizing data components, such as variable names and values uniformly across all segments of a project. This is particularly an important issue when data are collected on a number of biological/physical response and explanatory variables from various locations and times. The database system can integrate all segments of a large study into one unit, while providing oversight and accessibility to the data collection process. The quality of all data collected is uniformly maintained and compatibility between research efforts ensured. While the physical database would exist in a central location, access will not be physically limited. Advanced database interfaces are created to operate over the internet utilizing a Web-based relational database, allowing project members to access their data from virtually anywhere. These interfaces provide users

  9. Design iteration in construction projects – Review and directions

    Directory of Open Access Journals (Sweden)

    Purva Mujumdar

    2018-03-01

    Full Text Available Design phase of any construction project involves several designers who exchange information with each other most often in an unstructured manner throughout the design phase. When these information exchanges happen to occur in cycles/loops, it is termed as design iteration. Iteration is an inherent and unavoidable aspect of any design phase which requires proper planning. Till date, very few researchers have explored the design iteration (“complexity” in construction sector. Hence, the objective of this paper was to document and review the complexities of iteration during design phase of construction projects for efficient design planning. To achieve this objective, exhaustive literature review on design iteration was done for four sectors – construction, manufacturing, aerospace, and software development. In addition, semi-structured interviews and discussions were done with a few design experts to verify the different dimensions of iteration. Finally, a design iteration framework was presented in this study that facilitates successful planning. Keywords: Design iteration, Types of iteration, Causes and impact of iteration, Models of iteration, Execution strategies of iteration

  10. Options and recommendations for a web database of material and construction inspection.

    Science.gov (United States)

    2015-02-01

    The Illinois Department of Transportation (IDOT) has been using software developed in-house for their : materials management and construction project management needs. The primary packages under : review MISTIC (Materials Management) and ICORS (Const...

  11. A Case Study of Construction of Special Database on Urban Agriculture in Library of Beijing University of Agriculture

    OpenAIRE

    Liu, Qianning

    2013-01-01

    With the development of urban agriculture and digital library, the theoretical research and exploitation of special database on urban agriculture has become an inevitable trend. On the basis of analyzing the advantages of the special database on urban agriculture constructed by the library of Beijing University of Agriculture, the author has analyzed the status and the problems of the special database on urban agriculture developed by Beijing University of Agriculture and proposed the develop...

  12. MEASURING THE PERFORMANCE OF GUYANA’S CONSTRUCTION INDUSTRY USING A SET OF PROJECT PERFORMANCE BENCHMARKING METRICS

    Directory of Open Access Journals (Sweden)

    Christopher J. Willis

    2011-10-01

    Full Text Available A study measuring the performance of Guyana’s construction industry using a set of project performance benchmarking metrics was recently completed. The underlying premise of the study was that the aggregated performance of construction projects provides a realistic assessment of the performance of the construction industry, on the basis that construction projects are the mechanism through which the construction industry creates its tangible products. The fact that an influential government agency acted as owner of the study was critical to the data collection phase. The best approach for collecting project performance data in Guyana involves the utilisation of a researcher or team of researchers mining electronic and hard copy project documents. This study analysed approximately 270 construction projects to obtain an indication of the performance of guyana’s construction industry. It was found that sea defence projects performed the worst, whereas health facility projects performed the best. The main implication of this is that sea defence projects are likely to be the least efficient and, given their critical nature, there is an argument for urgent performance improvement interventions.

  13. Risk assessment framework on time impact: Infrastructure projects in soft soil during construction stage

    Science.gov (United States)

    Low, W. W.; Wong, K. S.; Lee, J. L.

    2018-04-01

    With the growth of economy and population, there is an increase in infrastructure construction projects. As such, it is unavoidable to have construction projects on soft soil. Without proper risk management plan, construction projects are vulnerable to different types of risks which will have negative impact on project’s time, cost and quality. Literature review showed that little or none of the research is focused on the risk assessment on the infrastructure project in soft soil. Hence, the aim of this research is to propose a risk assessment framework in infrastructure projects in soft soil during the construction stage. This research was focused on the impact of risks on project time and internal risk factors. The research method was Analytical Hierarchy Process and the sample population was experienced industry experts who have experience in infrastructure projects. Analysis was completed and result showed that for internal factors, the five most significant risks on time element are lack of special equipment, potential contractual disputes and claims, shortage of skilled workers, delay/lack of materials supply, and insolvency of contractor/sub-contractor. Results indicated that resources risk factor play a critical role on project time frame in infrastructure projects in soft soil during the construction stage.

  14. Attribute Hierarchy of Conflicts in Construction Projects: A Case Study of Sindh

    Directory of Open Access Journals (Sweden)

    Shabbir Hussain Khahro

    2015-10-01

    Full Text Available Conflicts seem to arise throughout the life cycle of the construction project and in result, these may lead to several other issues such as project cost overrun, time overrun, productivity loss, loss of profit and above all damage of business relationships in general and specifically in construction industry. Hence, this paper focuses on various direct and indirect causes leading to conflicts in construction industry of Sindh, Pakistan. Detailed literature review and interviews have been carried out to identify several direct and indirect causes of conflicts and finally, a set of questionnaire has been designed and distributed to get expert opinion on the significance of these causes in this sector. The data has been analyzed by RIW (Relative Importance Weight method. The outcome of this study shows that payment delay is the major direct cause of conflicts in the construction projects followed by contractual claims, public interruption, poor communication and site conditions. Thus, it is suggested that proper attention should be given to the above mentioned concerns so as to have a uniform flow of construction project life cycle without any interruption.

  15. Databases for neurogenetics: introduction, overview, and challenges.

    Science.gov (United States)

    Sobrido, María-Jesús; Cacheiro, Pilar; Carracedo, Angel; Bertram, Lars

    2012-09-01

    The importance for research and clinical utility of mutation databases, as well as the issues and difficulties entailed in their construction, is discussed within the Human Variome Project. While general principles and standards can apply to most human diseases, some specific questions arise when dealing with the nature of genetic neurological disorders. So far, publically accessible mutation databases exist for only about half of the genes causing neurogenetic disorders; and a considerable work is clearly still needed to optimize their content. The current landscape, main challenges, some potential solutions, and future perspectives on genetic databases for disorders of the nervous system are reviewed in this special issue of Human Mutation on neurogenetics. © 2012 Wiley Periodicals, Inc.

  16. Identifying the most critical project complexity factors using Delphi method: the Iranian construction industry

    Directory of Open Access Journals (Sweden)

    Mohammad Mehdi Mozaffari

    2012-09-01

    Full Text Available Complexity is one of the most important issues influencing success of any construction project and there are literally different studies devoted to detect important factors increasing complexity of projects. During the past few years, there have been growing interests in developing mass construction projects in Iran. The proposed study of this paper uses Delphi technique to find out about important factors as barriers of construction projects in Iran. The results show that among 47 project complexity factors, 19 factors are more important than others are. The study groups different factors into seven categories including environmental, organizational, objectives, tasks, stakeholders, technological, information systems and determines the relative importance of each. In each group, many other sub group activities are determined and they are carefully investigated. The study provides some detailed suggestions on each category to reduce the complexity of construction project.

  17. Modeling Manpower and Equipment Productivity in Tall Building Construction Projects

    Science.gov (United States)

    Mudumbai Krishnaswamy, Parthasarathy; Rajiah, Murugasan; Vasan, Ramya

    2017-12-01

    Tall building construction projects involve two critical resources of manpower and equipment. Their usage, however, widely varies due to several factors affecting their productivity. Currently, no systematic study for estimating and increasing their productivity is available. What is prevalent is the use of empirical data, experience of similar projects and assumptions. As tall building projects are here to stay and increase, to meet the emerging demands in ever shrinking urban spaces, it is imperative to explore ways and means of scientific productivity models for basic construction activities: concrete, reinforcement, formwork, block work and plastering for the input of specific resources in a mixed environment of manpower and equipment usage. Data pertaining to 72 tall building projects in India were collected and analyzed. Then, suitable productivity estimation models were developed using multiple linear regression analysis and validated using independent field data. It is hoped that the models developed in the study will be useful for quantity surveyors, cost engineers and project managers to estimate productivity of resources in tall building projects.

  18. Spent nuclear fuel project cold vacuum drying facility supporting data and calculation database

    Energy Technology Data Exchange (ETDEWEB)

    IRWIN, J.J.

    1999-02-26

    This document provides a database of supporting calculations for the Cold Vacuum Drying Facility (CVDF). The database was developed in conjunction with HNF-SD-SNF-SAR-002, ''Safety Analysis Report for the Cold Vacuum Drying Facility'', Phase 2, ''Supporting Installation of Processing Systems'' (Garvin 1998). The HNF-SD-SNF-DRD-002, 1997, ''Cold Vacuum Drying Facility Design Requirements'', Rev. 2, and the CVDF Summary Design Report. The database contains calculation report entries for all process, safety and facility systems in the CVDF, a general CVD operations sequence and the CVDF System Design Descriptions (SDDs). This database has been developed for the SNFP CVDF Engineering Organization and shall be updated, expanded, and revised in accordance with future design, construction and startup phases of the CVDF until the CVDF final ORR is approved.

  19. Archaeology and historical ecology: The archaeological database of the LONGWOOD ERC project

    Czech Academy of Sciences Publication Activity Database

    Kolář, Jan; Tkáč, Péter; Macek, Martin; Szabó, Péter

    2016-01-01

    Roč. 46, č. 4 (2016), s. 539-554 ISSN 0342-734X EU Projects: European Commission(XE) 278065 - LONGWOOD Institutional support: RVO:67985939 Keywords : database * modelling * historical ecology Subject RIV: EH - Ecology, Behaviour OBOR OECD: Ecology

  20. Validation of a for anaerobic bacteria optimized MALDI-TOF MS biotyper database: The ENRIA project.

    Science.gov (United States)

    Veloo, A C M; Jean-Pierre, H; Justesen, U S; Morris, T; Urban, E; Wybo, I; Kostrzewa, M; Friedrich, A W

    2018-03-12

    Within the ENRIA project, several 'expertise laboratories' collaborated in order to optimize the identification of clinical anaerobic isolates by using a widely available platform, the Biotyper Matrix Assisted Laser Desorption Ionization Time-of-Flight Mass Spectrometry (MALDI-TOF MS). Main Spectral Profiles (MSPs) of well characterized anaerobic strains were added to one of the latest updates of the Biotyper database db6903; (V6 database) for common use. MSPs of anaerobic strains nominated for addition to the Biotyper database are included in this validation. In this study, we validated the optimized database (db5989 [V5 database] + ENRIA MSPs) using 6309 anaerobic isolates. Using the V5 database 71.1% of the isolates could be identified with high confidence, 16.9% with low confidence and 12.0% could not be identified. Including the MSPs added to the V6 database and all MSPs created within the ENRIA project, the amount of strains identified with high confidence increased to 74.8% and 79.2%, respectively. Strains that could not be identified using MALDI-TOF MS decreased to 10.4% and 7.3%, respectively. The observed increase in high confidence identifications differed per genus. For Bilophila wadsworthia, Prevotella spp., gram-positive anaerobic cocci and other less commonly encountered species more strains were identified with higher confidence. A subset of the non-identified strains (42.1%) were identified using 16S rDNA gene sequencing. The obtained identities demonstrated that strains could not be identified either due to the generation of spectra of insufficient quality or due to the fact that no MSP of the encountered species was present in the database. Undoubtedly, the ENRIA project has successfully increased the number of anaerobic isolates that can be identified with high confidence. We therefore recommend further expansion of the database to include less frequently isolated species as this would also allow us to gain valuable insight into the clinical

  1. JET Project: progress in construction and management

    International Nuclear Information System (INIS)

    Bertolini, E.

    1978-01-01

    The JET Project of the European Community aims to construct and operate one of the largest Tokamak Devices foreseen at present in the field of Fusion Research. The aim of the experiment is to produce and study plasma conditions approaching those needed in a thermonuclear reactor and therefore will involve operation with deuterium--tritium gas

  2. 42 CFR 137.329 - What environmental considerations must be included in the construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... must be included in the construction project agreement? The construction project agreement must include..., and (d) An assurance that no action will be taken on the construction phase of the project that would... 42 Public Health 1 2010-10-01 2010-10-01 false What environmental considerations must be included...

  3. Diffusivity database (DDB) system for major rocks (Version of 2006/specification and CD-ROM)

    International Nuclear Information System (INIS)

    Tochigi, Yoshikatsu; Sasamoto, Hirosi; Shibata, Masahiro; Sato, Haruo; Yui, Mikazu

    2006-03-01

    The development of the database system has been started to manage with the generally used. The database system has been constructed based on datasheets of the effective diffusion coefficient of the nuclides in the rock matrix in order to be applied on the 'H12: Project to Establish the Scientific and Technical Basis for HLW Disposal in Japan'. In this document, the examination and expansion of the datasheet structure and the process of construction of the database system and conversion of all data existing on datasheets are described. As the first step of the development of the database, this database system and its data will continue to be updated and the interface will be revised to improve the availability. The developed database system is attached on the CD-ROM as the file format of Microsoft Access. (author)

  4. Estimating Required Contingency Funds for Construction Projects using Multiple Linear Regression

    National Research Council Canada - National Science Library

    Cook, Jason J

    2006-01-01

    Cost overruns are a critical problem for construction projects. The common practice for dealing with cost overruns is the assignment of an arbitrary flat percentage of the construction budget as a contingency fund...

  5. The Einstein Observatory stellar X-ray database

    International Nuclear Information System (INIS)

    Harnden, F.R. Jr.; Sciortino, S.; Micela, G.; Maggio, A.; Schmitt, J.H.M.M.

    1990-01-01

    We present the motivation for and methodology followed in constructing the Einstein Observatory Stellar X-ray Database from a uniform analysis of nearly 4000 Imaging Proportional Counter fields obtained during the life of this mission. This project has been implemented using the INGRES database system, so that statistical analyses of the properties of detected X-ray sources are relatively easily and flexibly accomplished. Some illustrative examples will furnish a general view both of the kind and amount of the archived information and of the statistical approach used in analyzing the global properties of the data. (author)

  6. Reliability database development for use with an object-oriented fault tree evaluation program

    Science.gov (United States)

    Heger, A. Sharif; Harringtton, Robert J.; Koen, Billy V.; Patterson-Hine, F. Ann

    1989-01-01

    A description is given of the development of a fault-tree analysis method using object-oriented programming. In addition, the authors discuss the programs that have been developed or are under development to connect a fault-tree analysis routine to a reliability database. To assess the performance of the routines, a relational database simulating one of the nuclear power industry databases has been constructed. For a realistic assessment of the results of this project, the use of one of existing nuclear power reliability databases is planned.

  7. Distributing Resources in a Construction Project

    DEFF Research Database (Denmark)

    Axel, Erik

    2015-01-01

    In the present paper the status of theories are discussed. It will be based on the fact that our understanding comes out of our common activity, and we will take point of departure in some empirical material from a construction project. We shall explore a conception of conflictual cooperation, wh...... that accordingly theories must change with the process, that they are dissolving in praxis. Keywords: arrangement, common cause, concept, conflictual cooperation, contradictions, design of square, praxis, procedure, resources, theory....

  8. The Application of the Real Options Method for the Evaluation of High-Rise Construction Projects

    Science.gov (United States)

    Izotov, Aleksandr; Rostova, Olga; Dubgorn, Alissa

    2018-03-01

    The paper is devoted to the problem of evaluation of high-rise construction projects in a rapidly changing environment. The authors proposed an algorithm for constructing and embedding real options in high-rise construction projects, which makes it possible to increase the flexibility of managing multi-stage projects that have the ability to adapt to changing conditions of implementation.

  9. Research on Risk Manage of Power Construction Project Based on Bayesian Network

    Science.gov (United States)

    Jia, Zhengyuan; Fan, Zhou; Li, Yong

    With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.

  10. KALIMER database development (database configuration and design methodology)

    International Nuclear Information System (INIS)

    Jeong, Kwan Seong; Kwon, Young Min; Lee, Young Bum; Chang, Won Pyo; Hahn, Do Hee

    2001-10-01

    KALIMER Database is an advanced database to utilize the integration management for Liquid Metal Reactor Design Technology Development using Web Applicatins. KALIMER Design database consists of Results Database, Inter-Office Communication (IOC), and 3D CAD database, Team Cooperation system, and Reserved Documents, Results Database is a research results database during phase II for Liquid Metal Reactor Design Technology Develpment of mid-term and long-term nuclear R and D. IOC is a linkage control system inter sub project to share and integrate the research results for KALIMER. 3D CAD Database is s schematic design overview for KALIMER. Team Cooperation System is to inform team member of research cooperation and meetings. Finally, KALIMER Reserved Documents is developed to manage collected data and several documents since project accomplishment. This report describes the features of Hardware and Software and the Database Design Methodology for KALIMER

  11. Project Culture in the Chinese Construction Industry: Perceptions of Contractors

    Directory of Open Access Journals (Sweden)

    Jian Zou

    2012-11-01

    Full Text Available In recent years culture has become one of the most studied topicsin project management research. Some studies have investigatedthe infl uence of culture at different levels – such as nationalculture, industry culture, organisational culture and professionalculture. As a project-based industry, the construction industryneeds to have more insight concerning cultural issues at theproject level and their infl uence on the performance of constructionprojects. Few studies, however, have focused on culture at theproject level. This paper uses a questionnaire survey to determinethe perceptions of Chinese contractors about the impact of projectculture on the performance of local construction projects. This isaugmented by a series of in-depth interviews with senior executivemanagers in the industry. The fi ndings indicate that specifi c projectculture does contribute signifi cantly towards project outcomes.In particular, goal orientation and fl exibility, as two dimensionsof project culture, have a negative statistical correlation withperceived satisfaction of the process, commercial success, futurebusiness opportunities, lessons learnt from the project, satisfactionwith the relationships, and overall performance. This paper alsoindicates that the affordability of developing an appropriate projectculture is a major concern for industry practitioners.

  12. 42 CFR 137.353 - What is contained in a construction project financial report?

    Science.gov (United States)

    2010-10-01

    ... financial report? 137.353 Section 137.353 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... § 137.353 What is contained in a construction project financial report? Construction project financial reports contain information regarding the amount of funds expended during the reporting period, and...

  13. The study of the risk management model of construction project

    International Nuclear Information System (INIS)

    Jiang Bo; Feng Yanping; Liu Changbin

    2010-01-01

    The paper first analyzed the development of the risk management of construction project and the risk management processes, and then briefly introduced the risk management experience of foreign project management. From the project management by objectives point of view, the greatest risk came from the lack of clarity of the objectives in the project management, which led to the project's risk emergence. In the analysis of the principles of the project objectives identification and risk allocation, the paper set up a project management model which insurance companies involved in the whole process of the project management, and simply analyzed the roles of insurance company at last. (authors)

  14. Identification of Tools and Techniques to Enhance Interdisciplinary Collaboration During Design and Construction Projects.

    Science.gov (United States)

    Keys, Yolanda; Silverman, Susan R; Evans, Jennie

    2017-10-01

    The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.

  15. A new version of the RDP (Ribosomal Database Project)

    Science.gov (United States)

    Maidak, B. L.; Cole, J. R.; Parker, C. T. Jr; Garrity, G. M.; Larsen, N.; Li, B.; Lilburn, T. G.; McCaughey, M. J.; Olsen, G. J.; Overbeek, R.; hide

    1999-01-01

    The Ribosomal Database Project (RDP-II), previously described by Maidak et al. [ Nucleic Acids Res. (1997), 25, 109-111], is now hosted by the Center for Microbial Ecology at Michigan State University. RDP-II is a curated database that offers ribosomal RNA (rRNA) nucleotide sequence data in aligned and unaligned forms, analysis services, and associated computer programs. During the past two years, data alignments have been updated and now include >9700 small subunit rRNA sequences. The recent development of an ObjectStore database will provide more rapid updating of data, better data accuracy and increased user access. RDP-II includes phylogenetically ordered alignments of rRNA sequences, derived phylogenetic trees, rRNA secondary structure diagrams, and various software programs for handling, analyzing and displaying alignments and trees. The data are available via anonymous ftp (ftp.cme.msu. edu) and WWW (http://www.cme.msu.edu/RDP). The WWW server provides ribosomal probe checking, approximate phylogenetic placement of user-submitted sequences, screening for possible chimeric rRNA sequences, automated alignment, and a suggested placement of an unknown sequence on an existing phylogenetic tree. Additional utilities also exist at RDP-II, including distance matrix, T-RFLP, and a Java-based viewer of the phylogenetic trees that can be used to create subtrees.

  16. Construction Project Success ranking through the Data Envelopment Analysis

    Directory of Open Access Journals (Sweden)

    Mazyar Zahedi-Seresht

    2014-09-01

    Full Text Available The purpose of this paper is to rank construction projects' success in a post delivery phase. To attain this objective, a data envelopment analysis (DEA approach is used. The model's output is a project success index which is calculated based on five project success criteria. These criteria which are determined by a two-round Delphi questionnaire survey are time performance, cost performance, quality, HSE, and customer satisfaction. The input factors which have effects on the output measures are Organizational Sponsorship, Project Manager Competency, Customer Organization, Project Operational Environment and Organizational Experience. The tool adopted to determine these factors is questionnaire. This model is applied for 9 projects with different importance of output and input factors and the reasonable result is achieved for ranking these projects.

  17. causes of conflicts in construction projects in nigeria

    African Journals Online (AJOL)

    user

    NIGERIA. 2 DEPARTMENT OF ARCHITECTURE AND CIVIL ENGINEERING, CITY ... Thus, this study was aimed at identifying and assessing causes of conflicts in Nigeria .... technical specification, government intervention, ..... scale construction projects: A case study,” Constr. ... study of Bygga Villa, a Swedish triple helix e-.

  18. Innovation in civil construction system of nuclear power plant

    International Nuclear Information System (INIS)

    Takami, Masahiro

    1996-01-01

    Nowadays, the computer-aided production systems have been already introduced to almost all kinds of industries. The construction industry, which has been said to be conservative for the modernization of production system, now expects the CIC (Computer Integrated Construction) as the means to innovate the construction production process. Shimizu Corporation has developed the new computer-aided production system, 'SIPS: Shimizu Integrated Production System', and has used it in the actual construction projects. In the system, the computer supports every phase of construction projects like market researching, design, material purchase, construction work, and maintenance. The project of Kashiwazaki-kariwa Nuclear Power Station Unit No.7 is one of the model cases. Here we applied following three concepts, (1) the full use and integration of 3D-CAD data-base through all phases of construction, (2) the setting-up of the information network system among the site office, the head office, and the mechanical and electrical manufacturer, (3) the introduction of advanced construction technologies such as large block prefabrication method. (author)

  19. Databases and coordinated research projects at the IAEA on atomic processes in plasmas

    Energy Technology Data Exchange (ETDEWEB)

    Braams, Bastiaan J.; Chung, Hyun-Kyung [Nuclear Data Section, NAPC Division, International Atomic Energy Agency P. O. Box 100, Vienna International Centre, AT-1400 Vienna (Austria)

    2012-05-25

    The Atomic and Molecular Data Unit at the IAEA works with a network of national data centres to encourage and coordinate production and dissemination of fundamental data for atomic, molecular and plasma-material interaction (A+M/PMI) processes that are relevant to the realization of fusion energy. The Unit maintains numerical and bibliographical databases and has started a Wiki-style knowledge base. The Unit also contributes to A+M database interface standards and provides a search engine that offers a common interface to multiple numerical A+M/PMI databases. Coordinated Research Projects (CRPs) bring together fusion energy researchers and atomic, molecular and surface physicists for joint work towards the development of new data and new methods. The databases and current CRPs on A+M/PMI processes are briefly described here.

  20. Databases and coordinated research projects at the IAEA on atomic processes in plasmas

    Science.gov (United States)

    Braams, Bastiaan J.; Chung, Hyun-Kyung

    2012-05-01

    The Atomic and Molecular Data Unit at the IAEA works with a network of national data centres to encourage and coordinate production and dissemination of fundamental data for atomic, molecular and plasma-material interaction (A+M/PMI) processes that are relevant to the realization of fusion energy. The Unit maintains numerical and bibliographical databases and has started a Wiki-style knowledge base. The Unit also contributes to A+M database interface standards and provides a search engine that offers a common interface to multiple numerical A+M/PMI databases. Coordinated Research Projects (CRPs) bring together fusion energy researchers and atomic, molecular and surface physicists for joint work towards the development of new data and new methods. The databases and current CRPs on A+M/PMI processes are briefly described here.

  1. Databases and coordinated research projects at the IAEA on atomic processes in plasmas

    International Nuclear Information System (INIS)

    Braams, Bastiaan J.; Chung, Hyun-Kyung

    2012-01-01

    The Atomic and Molecular Data Unit at the IAEA works with a network of national data centres to encourage and coordinate production and dissemination of fundamental data for atomic, molecular and plasma-material interaction (A+M/PMI) processes that are relevant to the realization of fusion energy. The Unit maintains numerical and bibliographical databases and has started a Wiki-style knowledge base. The Unit also contributes to A+M database interface standards and provides a search engine that offers a common interface to multiple numerical A+M/PMI databases. Coordinated Research Projects (CRPs) bring together fusion energy researchers and atomic, molecular and surface physicists for joint work towards the development of new data and new methods. The databases and current CRPs on A+M/PMI processes are briefly described here.

  2. Effectiveness of Quality Management System (QMS) on Construction Projects

    OpenAIRE

    Behnam Neyestani

    2016-01-01

    Quality management system (QMS) provides generic guidance and requirements for establishing an appropriate quality management procedure, in order to lower cost, increase productivity, customer's satisfaction, and market share in the organizations since the last two-decade. In construction industry, it can assist the companies to achieve successfully their objectives, and ensure that all phases of construction project consistently meet client's requirements (need). The main aim of this article...

  3. Common risks affecting time overrun in road construction projects in Palestine: Contractors’ perspective

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2013-06-01

    Full Text Available The construction sector is one of the key economic sectors and is the main force motivating the Palestinian national economy. However, it suffers from number of problems that affect time, cost and quality performances. This study aims at identifying the common risks affecting time overrun in road construction projects in the West Bank in Palestine from contractors’ viewpoint. 45 factors that might cause delays of road construction projects were defined through a detailed literature review. A questionnaire survey was performed to rank the considered factors in terms of severity and frequency. The analysis of the survey indicated that the top risks affecting time overrun in road construction projects in Palestine are: financial status of the contractors, payments delay by the owner, political situation, segmentation of the West Bank, poor communication between construction parties, lack of equipment efficiency, and high competition in bids.

  4. Challenges of the expansive use of Building Information Modeling (BIM in construction projects

    Directory of Open Access Journals (Sweden)

    Hannele Kerosuo

    2015-06-01

    Full Text Available Building information modeling (BIM is an emerging modeling technology which challenges existing work procedures and practices in the construction industry. In this article we study the challenges, problems and potential expansions of BIM as a tool in the design, construction and operation of buildings. For this purpose the interfaces between different parties are examined in Finnish construction projects. The methodological approach of the study is cultural-historical activity theory, according to which a new artifact becomes a mediating instrument when the participatory subjects reconfigure the entire activity. The implementation of BIM is now spreading from the design activity to other phases of the construction projects, but its use is still limited in the projects' other three interfaces. BIM is an evolving set of software developed for various purposes which is locally 'combined' to fit the circumstances and capabilities of the stakeholders of the construction process.

  5. Benefits of Building Information Modelling in the Project Lifecycle: Construction Projects in Asia

    Directory of Open Access Journals (Sweden)

    Jian Li

    2014-08-01

    Full Text Available Building Information Modelling (BIM is a process involving the creation and management of objective data with property, unique identity and relationship. In the Architecture, Engineering and Construction (AEC industry, BIM is adopted a lot in the lifecycle of buildings because of the high integration of information that it enables. Four-dimensional (4D computer-aided design (CAD has been adopted for many years to improve the construction planning process. BIM is adopted throughout buildings' lifecycles, in design, construction and operation. This paper presents five large-scale public and financial projects that adopt BIM in the design, construction and operational phases. Different uses of BIM are compared and contrasted in the context of the separate backgrounds. It is concluded that productivity is improved where BIM is used to enable easy sharing and integration of information and convenient collaboration.

  6. Study on evaluation of construction reliability for engineering project based on fuzzy language operator

    Science.gov (United States)

    Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping

    2018-03-01

    System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.

  7. Report on the database structuring project in fiscal 1996 related to the 'surveys on making databases for energy saving (2)'; 1996 nendo database kochiku jigyo hokokusho. Sho energy database system ka ni kansuru chosa 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    With an objective to support promotion of energy conservation in such countries as Japan, China, Indonesia, the Philippines, Thailand, Malaysia, Taiwan and Korea, primary information on energy conservation in each country was collected, and the database was structured. This paper summarizes the achievements in fiscal 1996. Based on the survey result on the database project having been progressed to date, and on various data having been collected, this fiscal year has discussed structuring the database for distribution and proliferation of the database. In the discussion, requirements for the functions to be possessed by the database, items of data to be recorded in the database, and processing of the recorded data were put into order referring to propositions on the database circumstances. Demonstrations for the database of a proliferation version were performed in the Philippines, Indonesia and China. Three hundred CDs for distribution in each country were prepared. Adjustments and confirmation on operation of the supplied computers were carried out, and the operation explaining meetings were held in China and the Philippines. (NEDO)

  8. Facilitating Client Value Creation in the Conceptual Design Phase of Construction Projects

    DEFF Research Database (Denmark)

    Thyssen, Mikael Hygum; Emmitt, Stephen; Bonke, Sten

    2009-01-01

    If client values are not fully understood in a construction project it is likely to result in either low fulfilment of client expectations or multiple design alterations during the project process which lead to additional costs and frustration among the project participants. However...... by the fact that the delivery team, which is responsible for understanding and delivering client value, is made up of even more different parties. The paper reports the initial outcome of a joint research project between academics and practitioners, which aims to develop a practical workshop model...... that incorporates client values into the conceptual design of construction projects. The workshop model draws on value management and lean thinking as underlying principles in an attempt to address the ambiguous concept of ‘value’....

  9. The database of the PREDICTS (Projecting Responses of Ecological Diversity In Changing Terrestrial Systems) project

    OpenAIRE

    Hudson, LN; Newbold, T; Contu, S; Hill, SLL; Lysenko, I; De Palma, A; Phillips, HRP; Alhusseini, TI; Bedford, FE; Bennett, DJ; Booth, H; Burton, VJ; Chng, CWT; Choimes, A; Correia, DLP

    2017-01-01

    The PREDICTS project—Projecting Responses of Ecological Diversity In Changing Terrestrial Systems (www.predicts.org.uk)—has collated from published studies a large, reasonably representative database of comparable samples of biodiversity from multiple sites that differ in the nature or intensity of human impacts relating to land use. We have used this evidence base to develop global and regional statistical models of how local biodiversity responds to these measures. We describe and make free...

  10. Rural Residents’ Perception of Construction Project Delays in Pakistan

    Directory of Open Access Journals (Sweden)

    Shahid Hussain

    2017-11-01

    Full Text Available The construction industry is one of the key sectors that facilitate sustainable economic and social development in the region. Currently, community development mechanisms are adopted by many developed and developing nations, aimed at enhancing economic growth and quality of life along with social welfare of the local community. This study reviews the rural residents’ perception of public construction project delays and aims to explore economic and social challenges confronted by residents, especially in rural areas in Pakistan. A questionnaire with 26 factors identified from the literature was sent to rural educated residents. Through a questionnaire survey, the opinions of rural residents were sought and tested. Based on 366 (73% valid responses, this study examined the socio-economic influencing factors. The findings of the study revealed that problems faced while traveling, increase the price of consumer goods, high transportation costs, lack of educational opportunities, more expenditures on education, and barriers to primary healthcare access were the top most important factors. Research results confirmed that the delays in construction projects negatively affect the socio-economic conditions of the rural community, which directly influence the rural dwells’ sustainable life. The research findings suggest that the practitioners in public sector organization make sure to execute the project on time and within the quality. Otherwise, it has negative socio-economic implications for the rural community.

  11. KALIMER database development

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Kwan Seong; Lee, Yong Bum; Jeong, Hae Yong; Ha, Kwi Seok

    2003-03-01

    KALIMER database is an advanced database to utilize the integration management for liquid metal reactor design technology development using Web applications. KALIMER design database is composed of results database, Inter-Office Communication (IOC), 3D CAD database, and reserved documents database. Results database is a research results database during all phase for liquid metal reactor design technology development of mid-term and long-term nuclear R and D. IOC is a linkage control system inter sub project to share and integrate the research results for KALIMER. 3D CAD database is a schematic overview for KALIMER design structure. And reserved documents database is developed to manage several documents and reports since project accomplishment.

  12. KALIMER database development

    International Nuclear Information System (INIS)

    Jeong, Kwan Seong; Lee, Yong Bum; Jeong, Hae Yong; Ha, Kwi Seok

    2003-03-01

    KALIMER database is an advanced database to utilize the integration management for liquid metal reactor design technology development using Web applications. KALIMER design database is composed of results database, Inter-Office Communication (IOC), 3D CAD database, and reserved documents database. Results database is a research results database during all phase for liquid metal reactor design technology development of mid-term and long-term nuclear R and D. IOC is a linkage control system inter sub project to share and integrate the research results for KALIMER. 3D CAD database is a schematic overview for KALIMER design structure. And reserved documents database is developed to manage several documents and reports since project accomplishment

  13. Project for construction of a new nuclear unit in Armenia

    International Nuclear Information System (INIS)

    2010-01-01

    WorleyParsons Project Description Scope of work: Management Services for Implementation of the Project on Construction of New Nuclear Unit(s) in the Republic of Armenia. Client: Ministry of Energy and Natural Resources (MENR), Republic of Armenia •Contract signed on 29 of May 2009 •Project divided into 4 Phases. Addendum 1 covers phase I and II signed on 27 of July. Contract entered into force 7 of August

  14. A Multi-Objective Trade-Off Model in Sustainable Construction Projects

    Directory of Open Access Journals (Sweden)

    Guangdong Wu

    2017-10-01

    Full Text Available Based on the consideration of the relative importance of sustainability-related objectives and the inherent nature of sustainable construction projects, this study proposes that the contractor can balance the levels of efforts and resources used to improve the overall project sustainability. A multi-objective trade-off model using game theory was established and verified through simulation and numerical example under a moral hazard situation. Results indicate that effort levels of the contractor on sustainability-related objectives are positively related to the outcome coefficient while negatively to the coefficients of effort cost of the relevant objectives. High levels of the relative importance of sustainability-related objectives contribute to high levels of effort of the contractor. With the variation in effort levels and the coefficient of benefit allocation, the project net benefit increases before declining. The function of project benefit has a marked peak value, with an inverted “U” shape. An equilibrium always exists as for the given relative importance and coefficients of the effort costs of sustainability-related objectives. Under this condition, the owner may offer the contractor a less intense incentive and motivate the contractor reasonably arranging input resources. The coefficient of benefit allocation is affected by the contractor characteristic factors and the project characteristic factors. The owner should balance these two types of factors and select the most appropriate incentive mechanism to improve the project benefit. Meanwhile, the contractor can balance the relative importance of the objectives and arrange the appropriate levels of effort and resources to achieve a sustainability-related objective. Very few studies have emphasized the effects of the relative importance of sustainability-related objectives on the benefits of sustainable construction projects. This study therefore builds a multi-objective trade

  15. Investigation on construction of the database system for research and development of the global environment industry technology; Chikyu kankyo sangyo gijutsu kenkyu kaihatsuyo database system no kochiku ni kansuru chosa

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    This paper studies a concrete plan to introduce a new database system of Research Institute of Innovative Technology for the Earth (RITE) which is necessary to promote the industrial technology development contributing to solution of the global environmental problem. Specifications for system introduction are about maker selection, operation system, detailed schedule for introduction, etc. RITE inhouse database has problems on its operation system and its maintenance cost, and is apt to be high in a construction cost in comparison with a utilization factor. Further study is made on its introduction. Information provided by the inhouse database is only the one owned by the organization, and information outside the organization is provided by the external database. The information is registered and selected by the registerer himself. The access network is set by personal computer network at the beginning and is set to transit to INTERNET in the future. For practical construction of the system, it is necessary to make user`s detailed needs clear for the system design and to adjust functions between hardware systems. 32 figs., 9 tabs.

  16. Principles for the formation of an effective concept of multifunctional high-rise construction investment projects

    Directory of Open Access Journals (Sweden)

    Beliakov Sergei

    2018-01-01

    Full Text Available Investment projects of high-rise construction have a number of features that determine specific risks and additional opportunities that require analysis and accounting in the formation of an effective project concept. The most significant features of high-rise construction include long construction time, complexity of technical and technological solutions, complexity of decisions on the organization of construction and operation, high cost of construction and operation, complexity in determining the ratio of areas designed to accommodate different functional areas, when organizing and coordinating the operation of the facility, with internal zoning. Taking into account the specificity of high-rise construction, among the factors determining the effectiveness of projects, it is advisable to consider as key factors: organizational, technological and investment factors. Within the framework of the article, the author singled out key particular functions for each group of factors under consideration, and also developed a system of principles for the formation of an effective concept of multifunctional high-rise construction investment projects, including the principle of logistic efficiency, the principle of optimal functional zoning, the principle of efficiency of equipment use, the principle of optimizing technological processes, the principle maximization of income, the principle of fund management, the principle of risk management . The model of formation of an effective concept of investment projects of multifunctional high-rise construction developed by the author can contribute to the development of methodological tools in the field of managing the implementation of high-rise construction projects, taking into account their specificity in the current economic conditions.

  17. Principles for the formation of an effective concept of multifunctional high-rise construction investment projects

    Science.gov (United States)

    Beliakov, Sergei

    2018-03-01

    Investment projects of high-rise construction have a number of features that determine specific risks and additional opportunities that require analysis and accounting in the formation of an effective project concept. The most significant features of high-rise construction include long construction time, complexity of technical and technological solutions, complexity of decisions on the organization of construction and operation, high cost of construction and operation, complexity in determining the ratio of areas designed to accommodate different functional areas, when organizing and coordinating the operation of the facility, with internal zoning. Taking into account the specificity of high-rise construction, among the factors determining the effectiveness of projects, it is advisable to consider as key factors: organizational, technological and investment factors. Within the framework of the article, the author singled out key particular functions for each group of factors under consideration, and also developed a system of principles for the formation of an effective concept of multifunctional high-rise construction investment projects, including the principle of logistic efficiency, the principle of optimal functional zoning, the principle of efficiency of equipment use, the principle of optimizing technological processes, the principle maximization of income, the principle of fund management, the principle of risk management . The model of formation of an effective concept of investment projects of multifunctional high-rise construction developed by the author can contribute to the development of methodological tools in the field of managing the implementation of high-rise construction projects, taking into account their specificity in the current economic conditions.

  18. Development of an Internet-based data explorer for a samples databases: the example of the STRATFEED project

    Directory of Open Access Journals (Sweden)

    Dardenne P.

    2004-01-01

    Full Text Available A key aspect of the European STRATFEED project on developing and validating analytical methods to detect animal meal in feed was the creation of a samples bank. To manage the 2,500 samples that were stored in the samples bank, another important objective was to build a database and develop an Internet-based data explorer – the STRATFEED explorer – to enable all laboratories and manufacturers working in the feed sector to make use of the database. The concept developed for the STRATFEED project could be used for samples management in other projects and it is easily adapted to meet a variety of requirements. The STRATFEED explorer can now be run from the public website http://stratfeed.cra.wallonie.be. Each webpage of this application is described in a documentation file aimed at helping the user to explore the database.

  19. An Agent Based Approach for Project Management in Construction

    OpenAIRE

    Sencer, Safiye; Turgay, Tahsin

    2013-01-01

    Project management has an important role in terms of time, cost and flexibility. An agentbased architecture provides additional robustness, scalability, flexibility that is particularly appropriate for problems with a dynamic and distributed nature. Integrated agent based project management covers design and construction planning. It is combined with plan execution, tolerating both the design and plan, which may be changed as necessary. In this reason, the decision making process requires tha...

  20. User's guide to the Geothermal Resource Areas Database

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, J.D.; Leung, K.; Yen, W.

    1981-10-01

    The National Geothermal Information Resource project at the Lawrence Berkeley Laboratory is developing a Geothermal Resource Areas Database, called GRAD, designed to answer questions about the progress of geothermal energy development. This database will contain extensive information on geothermal energy resources for selected areas, covering development from initial exploratory surveys to plant construction and operation. The database is available for on-lie interactive query by anyone with an account number on the computer, a computer terminal with an acoustic coupler, and a telephone. This report will help in making use of the database. Some information is provided on obtaining access to the computer system being used, instructions on obtaining standard reports, and some aids to using the query language.

  1. Critical Success Factors in Construction Projects (Governmental Projects as a Case Study

    Directory of Open Access Journals (Sweden)

    Hatem Khaleefah Al-Ageeli

    2016-03-01

    Full Text Available The importance of the construction sector and its Great role in the provision of services and infrastructure, reduce poverty, improve living conditions and improve the economic situation in the country, impose attention to the way in which the projects implemented for its improvement and to get successful projects. The objective of this research was to determine the criteria for success as well as critical success and failure factors that have a significant impact on project success. A selected 75 engineer (department managers, project managers and engineers are asked to fill the questionnaire form, Sixty-seven valid questionnaire forms were analyzed statistically to get search results, which were as follows : Twelve critical success factors, the most important factors of it were ("contractor financial efficiency ", " security ,political , economic stability ", "the project manager competence" and " Integration and clarity of contract documents " , thirteen critical failure factors, the most important factors of it were ("corruption " , " external circumstances ", "Financial difficulties of owner", and ten success criteria , the most important criteria of it were ("within allocated budget" , " within time period" , "Quality" .

  2. Project management practice and its effects on project success in Malaysian construction industry

    Science.gov (United States)

    Haron, N. A.; Devi, P.; Hassim, S.; Alias, A. H.; Tahir, M. M.; Harun, A. N.

    2017-12-01

    The rapid economic development has increased the demand for construction of infrastructure and facilities globally. Sustainable development and globalization are the new ‘Zeitgeist’ of the 21st century. In order to implement these projects successfully and to meet the functional aim of the projects within their lifetime, an efficient project management practice is needed. The aim of this study is to identify the critical success factors (CSFs) and the extent of use of project management practice which affects project success, especially during the implementation stage. Data were obtained from self-administered questionnaires with 232 respondents. A mixed method of data collection was adopted using semi-structured interview and questionnaire approach. The result of the analysis of data obtained showed that new and emerging criteria such as customer satisfaction, competency of the project team, and performance of subcontractors/suppliers are becoming measures of success in addition to the classic iron triangle’s view of time, cost and quality. An insight on the extent of use of different project management practice in the industry was also achieved from the study.

  3. Construction safety monitoring based on the project's characteristic with fuzzy logic approach

    Science.gov (United States)

    Winanda, Lila Ayu Ratna; Adi, Trijoko Wahyu; Anwar, Nadjadji; Wahyuni, Febriana Santi

    2017-11-01

    Construction workers accident is the highest number compared with other industries and falls are the main cause of fatal and serious injuries in high rise projects. Generally, construction workers accidents are caused by unsafe act and unsafe condition that can occur separately or together, thus a safety monitoring system based on influencing factors is needed to achieve zero accident in construction industry. The dynamic characteristic in construction causes high mobility for workers while doing the task, so it requires a continuously monitoring system to detect unsafe condition and to protect workers from potential hazards. In accordance with the unique nature of project, fuzzy logic approach is one of the appropriate methods for workers safety monitoring on site. In this study, the focus of discussion is based on the characteristic of construction projects in analyzing "potential hazard" and the "protection planning" to be used in accident prevention. The data have been collected from literature review, expert opinion and institution of safety and health. This data used to determine hazard identification. Then, an application model is created using Delphi programming. The process in fuzzy is divided into fuzzification, inference and defuzzification, according to the data collection. Then, the input and final output data are given back to the expert for assessment as a validation of application model. The result of the study showed that the potential hazard of construction workers accident could be analysed based on characteristic of project and protection system on site and fuzzy logic approach can be used for construction workers accident analysis. Based on case study and the feedback assessment from expert, it showed that the application model can be used as one of the safety monitoring tools.

  4. Assessing construction project performance in Ghana : modelling practitioners' and clients perspectives

    NARCIS (Netherlands)

    Gyadu-Asiedu, W.

    2009-01-01

    Several countries at various levels of socio-economic development have recognised the need and importance of taking measures to improve the performance of their construction industry. One of the means to this end has been to ensure performance efficiency in construction project execution. As has

  5. Defining collaborative elements in an effective and efficient collaboration in a construction project

    DEFF Research Database (Denmark)

    Bohnstedt, Kristian Ditlev; Wandahl, Søren

    2018-01-01

    Professional organizations, companies, educational and research institutions of the construction industry and the government have been driving initiatives and participated in the debate on the future of the construction industry. The state has participated in the construction industry development...... through experimental construction projects and debates and, on this basis, demanded and released guidelines for public and publicly funded construction projects. In the quest of defining collaborative elements, previous efforts have been reviewed, thus, identifying most successful initiatives and the used...... collaborative elements. These elements will be included in a study where they will go through a verification process. The themes derived from a contraction of the identified aspects in collaboration through the past two decades in the Danish construction industry were examined to conclude on which of the themes...

  6. Quantitative Decision Making Model for Carbon Reduction in Road Construction Projects Using Green Technologies

    Directory of Open Access Journals (Sweden)

    Woosik Jang

    2015-08-01

    Full Text Available Numerous countries have established policies for reducing greenhouse gas emissions and have suggested goals pertaining to these reductions. To reach the target reduction amounts, studies on the reduction of carbon emissions have been conducted with regard to all stages and processes in construction projects. According to a study on carbon emissions, the carbon emissions generated during the construction stage of road projects account for approximately 76 to 86% of the total carbon emissions, far exceeding the other stages, such as maintenance or demolition. Therefore, this study aims to develop a quantitative decision making model that supports the application of green technologies (GTs to reduce carbon emissions during the construction stage of road construction projects. First, the authors selected environmental soundness, economic feasibility and constructability as the key assessment indices for evaluating 20 GTs. Second, a fuzzy set/qualitative comparative analysis (FS/QCA was used to establish an objective decision-making model for the assessment of both the quantitative and qualitative characteristics of the key indices. To support the developed model, an expert survey was performed to assess the applicability of each GT from a practical perspective, which was verified with a case study using two additional GTs. The proposed model is expected to support practitioners in the application of suitable GTs to road projects and reduce carbon emissions, resulting in better decision making during road construction projects.

  7. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  8. NNDC database migration project

    Energy Technology Data Exchange (ETDEWEB)

    Burrows, Thomas W; Dunford, Charles L [U.S. Department of Energy, Brookhaven Science Associates (United States)

    2004-03-01

    NNDC Database Migration was necessary to replace obsolete hardware and software, to be compatible with the industry standard in relational databases (mature software, large base of supporting software for administration and dissemination and replication and synchronization tools) and to improve the user access in terms of interface and speed. The Relational Database Management System (RDBMS) consists of a Sybase Adaptive Server Enterprise (ASE), which is relatively easy to move between different RDB systems (e.g., MySQL, MS SQL-Server, or MS Access), the Structured Query Language (SQL) and administrative tools written in Java. Linux or UNIX platforms can be used. The existing ENSDF datasets are often VERY large and will need to be reworked and both the CRP (adopted) and CRP (Budapest) datasets give elemental cross sections (not relative I{gamma}) in the RI field (so it is not immediately obvious which of the old values has been changed). But primary and secondary intensities are now available on the same scale. The intensity normalization has been done for us. We will gain access to a large volume of data from Budapest and some of those gamma-ray intensity and energy data will be superior to what we already have.

  9. Data processing project management in the construction of plants and power stations

    International Nuclear Information System (INIS)

    Huelsen, H.; Hayen, W.

    1987-01-01

    The requirements of project management in plant construction i.e. basic data, supervision and control became more and more detailed. These requirements can only satisfactorily be met with the help of data processing. Piping design requires up to 50% of the whole amount of engineering in design and management of plant construction. We present data processing project management system which explains the connections of single aspects. Its connections consists of: collection of basic data, plant design and installation, supervision of planning and installation, planning and calculation, collection, use, administration and approval of plan data, procurement material, construction of the model (1:25), and installation. (orig.) [de

  10. Construction of an ortholog database using the semantic web technology for integrative analysis of genomic data.

    Science.gov (United States)

    Chiba, Hirokazu; Nishide, Hiroyo; Uchiyama, Ikuo

    2015-01-01

    Recently, various types of biological data, including genomic sequences, have been rapidly accumulating. To discover biological knowledge from such growing heterogeneous data, a flexible framework for data integration is necessary. Ortholog information is a central resource for interlinking corresponding genes among different organisms, and the Semantic Web provides a key technology for the flexible integration of heterogeneous data. We have constructed an ortholog database using the Semantic Web technology, aiming at the integration of numerous genomic data and various types of biological information. To formalize the structure of the ortholog information in the Semantic Web, we have constructed the Ortholog Ontology (OrthO). While the OrthO is a compact ontology for general use, it is designed to be extended to the description of database-specific concepts. On the basis of OrthO, we described the ortholog information from our Microbial Genome Database for Comparative Analysis (MBGD) in the form of Resource Description Framework (RDF) and made it available through the SPARQL endpoint, which accepts arbitrary queries specified by users. In this framework based on the OrthO, the biological data of different organisms can be integrated using the ortholog information as a hub. Besides, the ortholog information from different data sources can be compared with each other using the OrthO as a shared ontology. Here we show some examples demonstrating that the ortholog information described in RDF can be used to link various biological data such as taxonomy information and Gene Ontology. Thus, the ortholog database using the Semantic Web technology can contribute to biological knowledge discovery through integrative data analysis.

  11. The Genomes OnLine Database (GOLD) v.5: a metadata management system based on a four level (meta)genome project classification

    Science.gov (United States)

    Reddy, T.B.K.; Thomas, Alex D.; Stamatis, Dimitri; Bertsch, Jon; Isbandi, Michelle; Jansson, Jakob; Mallajosyula, Jyothi; Pagani, Ioanna; Lobos, Elizabeth A.; Kyrpides, Nikos C.

    2015-01-01

    The Genomes OnLine Database (GOLD; http://www.genomesonline.org) is a comprehensive online resource to catalog and monitor genetic studies worldwide. GOLD provides up-to-date status on complete and ongoing sequencing projects along with a broad array of curated metadata. Here we report version 5 (v.5) of the database. The newly designed database schema and web user interface supports several new features including the implementation of a four level (meta)genome project classification system and a simplified intuitive web interface to access reports and launch search tools. The database currently hosts information for about 19 200 studies, 56 000 Biosamples, 56 000 sequencing projects and 39 400 analysis projects. More than just a catalog of worldwide genome projects, GOLD is a manually curated, quality-controlled metadata warehouse. The problems encountered in integrating disparate and varying quality data into GOLD are briefly highlighted. GOLD fully supports and follows the Genomic Standards Consortium (GSC) Minimum Information standards. PMID:25348402

  12. The Genomes OnLine Database (GOLD) v.5: a metadata management system based on a four level (meta)genome project classification

    Energy Technology Data Exchange (ETDEWEB)

    Reddy, Tatiparthi B. K. [USDOE Joint Genome Institute (JGI), Walnut Creek, CA (United States); Thomas, Alex D. [USDOE Joint Genome Institute (JGI), Walnut Creek, CA (United States); Stamatis, Dimitri [USDOE Joint Genome Institute (JGI), Walnut Creek, CA (United States); Bertsch, Jon [USDOE Joint Genome Institute (JGI), Walnut Creek, CA (United States); Isbandi, Michelle [USDOE Joint Genome Institute (JGI), Walnut Creek, CA (United States); Jansson, Jakob [USDOE Joint Genome Institute (JGI), Walnut Creek, CA (United States); Mallajosyula, Jyothi [USDOE Joint Genome Institute (JGI), Walnut Creek, CA (United States); Pagani, Ioanna [USDOE Joint Genome Institute (JGI), Walnut Creek, CA (United States); Lobos, Elizabeth A. [USDOE Joint Genome Institute (JGI), Walnut Creek, CA (United States); Kyrpides, Nikos C. [USDOE Joint Genome Institute (JGI), Walnut Creek, CA (United States); King Abdulaziz Univ., Jeddah (Saudi Arabia)

    2014-10-27

    The Genomes OnLine Database (GOLD; http://www.genomesonline.org) is a comprehensive online resource to catalog and monitor genetic studies worldwide. GOLD provides up-to-date status on complete and ongoing sequencing projects along with a broad array of curated metadata. Within this paper, we report version 5 (v.5) of the database. The newly designed database schema and web user interface supports several new features including the implementation of a four level (meta)genome project classification system and a simplified intuitive web interface to access reports and launch search tools. The database currently hosts information for about 19 200 studies, 56 000 Biosamples, 56 000 sequencing projects and 39 400 analysis projects. More than just a catalog of worldwide genome projects, GOLD is a manually curated, quality-controlled metadata warehouse. The problems encountered in integrating disparate and varying quality data into GOLD are briefly highlighted. Lastly, GOLD fully supports and follows the Genomic Standards Consortium (GSC) Minimum Information standards.

  13. Hanford's 100-HX Pump and Treat Project - a Successful Blend of Science, Technology, Construction, and Project Management - 12412

    Energy Technology Data Exchange (ETDEWEB)

    Albin, Kenneth A.; Bachand, Marie T.; Biebesheimer, Fred H.; Neshem, Dean O.; Smoot, John L. [CH2M HILL Plateau Remediation Company, Richland, Washington 99352 (United States)

    2012-07-01

    CH2M Hill Plateau Remediation Company (CHPRC) recently completed construction and start-up of the $25 million 100-HX Groundwater Pump and Treat Project for the Department of Energy (DOE) at its Hanford Reservation site in Washington State. From the onset, the 100-HX Project Leadership Team was able to successfully blend the science and technology of a state-of-the-art groundwater pump and treat system with the principles, tools, and techniques of traditional industrial-type construction and project management. From the 1940's through most of the 1980's, the United States used the Hanford Site to produce nuclear material for national defense at reactor sites located along the Columbia River. While the reactors were operational, large volumes of river water were treated with sodium dichromate (to inhibit corrosion of the reactor piping) and used as a coolant for the reactors. After a single pass through the reactor and before being discharged back to the river, the coolant water was sent to unlined retention basins to cool and to allow the short-lived radioactive contaminants to decay. As a result of these operations, hexavalent chromium was introduced to the vadose zone, and ultimately into the groundwater aquifer and the adjacent Columbia River. In addition, numerous leaks and spills of concentrated sodium dichromate stock solution over the lifetime of reactor operations led to higher concentrations of chromate in the vadose zone and groundwater in localized areas. As a result, the 100 Area was included in the National Priorities List sites under the Comprehensive Environmental Response Compensation and Liability Act of 1980 (CERCLA). The mission of the 100-HX Project is to significantly reduce the concentration of hexavalent chromium in the groundwater by treating up to 3.8 billion gallons (14,300 mega-liters) of contaminated water over its first nine years of operations. In order to accomplish this mission, groundwater scientists and geologists using

  14. Transport and Environment Database System (TRENDS): Maritime Air Pollutant Emission Modelling

    DEFF Research Database (Denmark)

    Georgakaki, Aliki; Coffey, Robert; Lock, Grahm

    2005-01-01

    This paper reports the development of the maritime module within the framework of the Transport and Environment Database System (TRENDS) project. A detailed database has been constructed for the calculation of energy consumption and air pollutant emissions. Based on an in-house database...... changes from findings reported in Methodologies for Estimating air pollutant Emissions from Transport (MEET). The database operates on statistical data provided by Eurostat, which describe vessel and freight movements from and towards EU 15 major ports. Data are at port to Maritime Coastal Area (MCA...... with a view to this purpose, are mentioned. Examples of the results obtained by the database are presented. These include detailed air pollutant emission calculations for bulk carriers entering the port of Helsinki, as an example of the database operation, and aggregate results for different types...

  15. Using a Semi-Realistic Database to Support a Database Course

    Science.gov (United States)

    Yue, Kwok-Bun

    2013-01-01

    A common problem for university relational database courses is to construct effective databases for instructions and assignments. Highly simplified "toy" databases are easily available for teaching, learning, and practicing. However, they do not reflect the complexity and practical considerations that students encounter in real-world…

  16. FY 1996 report on the basic survey project on the enhancement of energy efficiency in developing countries - database construction project. Volume 1. Outline of the survey and collection of the data to be included in database; 1996 nendo hatten tojokoku energy koritsuka kiso chosa jigyo (database kochiku jigyo) hokokusho. 1. Chosa no gaiyo oyobi database ni shurokusuru data no shushu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    Following the previous fiscal year, construction/study of database were carried out with the aim of energy conservation for 8 countries: Japan, China, Indonesia, the Philippines, Thailand, Malaysia, Taiwan and Korea. In the study of the items of the data included, the 192 data extracted in conceptual design were re-classified into 6 large-groups and 91 medium-groups. As to the data collection, in A group countries, counterparts were requested to collect data, and 1342-1740 data were newly collected. In B group countries, Mitsubishi Research Institute, Inc. mostly collected 957 new data in Thailand, 814 data in Malaysia and 1312 data in Japan in cooperation with research institutes and investigating organizations in each country. In C group countries, 169 and 317 common data items were collected in Vietnam and India, respectively. Relating to plans for database promotion, as a result of the study with each country, 16 measures for promotion were extracted in terms of the leveling-up of NEDO-DB recognition, education of the use method, training of the operation method, etc. (NEDO)

  17. Preliminary study for unified management of CANDU safety codes and construction of database system

    International Nuclear Information System (INIS)

    Min, Byung Joo; Kim, Hyoung Tae

    2003-03-01

    It is needed to develop the Graphical User Interface(GUI) for the unified management of CANDU safety codes and to construct database system for the validation of safety codes, for which the preliminary study is done in the first stage of the present work. The input and output structures and data flow of CATHENA and PRESCON2 are investigated and the interaction of the variables between CATHENA and PRESCON2 are identified. Furthermore, PC versions of CATHENA and PRESCON2 codes are developed for the interaction of these codes and GUI(Graphic User Interface). The PC versions are assessed by comparing the calculation results with those by HP workstation or from FSAR(Final Safety Analysis Report). Preliminary study on the GUI for the safety codes in the unified management system are done. The sample of GUI programming is demonstrated preliminarily. Visual C++ is selected as the programming language for the development of GUI system. The data for Wolsong plants, reactor core, and thermal-hydraulic experiments executed in the inside and outside of the country, are collected and classified following the structure of the database system, of which two types are considered for the final web-based database system. The preliminary GUI programming for database system is demonstrated, which is updated in the future work

  18. Project Management Life Cycle Models to Improve Management in High-rise Construction

    Science.gov (United States)

    Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana

    2018-03-01

    The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  19. Project Management Life Cycle Models to Improve Management in High-rise Construction

    Directory of Open Access Journals (Sweden)

    Burmistrov Andrey

    2018-01-01

    Full Text Available The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  20. A Decision Model Assessing the Owner and Contractor’s Conflict Behaviors in Construction Projects

    Directory of Open Access Journals (Sweden)

    Guangdong Wu

    2018-01-01

    Full Text Available Considering the effects of the contractor’s conflict behaviors on the project benefit, a decision model between the owner and contractor’s conflict behaviors in construction projects was constructed using the principal-agent theory and game theory. The model was analyzed under nonconflicting and conflicting conditions, and a numerical simulation and example analysis were proposed to verify the constructed model’s conclusion. The results showed that the effort levels of the owner and contractor not only relate to benefit-sharing coefficient and effort outcome coefficient but also depend on the contractor’s ability of converting the conflict into benefit and the loss caused by conflict behaviors. A higher ability of converting conflicts into benefits and lower levels of the loss caused by conflict behaviors for the contractor lead to lower levels of the net benefit of the owner, conversely higher levels of the net benefit of the contractor. Balancing the contractor’s ability of converting conflicts into benefits and the loss caused by conflict behaviors lead to a more reasonable risk allocation between the owner and contractor, improving the effort level and net benefit. To add value to the construction project, the owner should establish an impartial and reasonable benefit-sharing mechanism, optimize the owner and contractor’s resource arrangement, maximize the positive effect of conflict on project benefits, and avoid the negative effect of conflict. Few studies to date have investigated the effects of conflict behaviors on project benefits in terms of modeling and simulation in construction projects. As such, this study bridges this gap and contributes significant theoretical and practical insights about managing conflict behaviors in an interorganizational context, thus enhancing performance in construction projects.

  1. Facilitating Value Creation and Delivery in Construction Projects

    DEFF Research Database (Denmark)

    Thyssen, Mikael Hygum; Bonke, Sten

    This thesis is about value creation in the early stages of construction design processes. It has been problem-driven with a specific management concept, the workshop model, as an outset. Essentially the question was; how should construction project design processes be managed with the objective...... awareness about the potential ‘pit-falls’ observed in the case-studies by means of three metaphors for reflection and design-group adjustment. These are: (1) Part-whole conversation, (2) Game of persuasion and (3) Hyper-reality. Reflection and adjustment may require the inclusion of a facilitator....... In addition, concrete suggestions for further development of the design management concept, the workshop model, are provided. In general, the thesis contributes to the emerging literature on construction design man-agement, which is still in its infancy. In addition, the theory part of the thesis contrib...

  2. Construction delays: a case study in the Brazilian Amazon

    Directory of Open Access Journals (Sweden)

    Luiz Mauricio Furtado Maués

    Full Text Available Abstract he construction industry is one of the industrial sectors with the lowest rates of fulfilment of contract deadlines, especially in developing countries. This fact has been the focus of considerable discussions seeking to identify the causes of the delays. The main purpose of this paper is to use factor analysis to identify the factors that are correlated with delay, contemplating exclusively residential real estate projects and using a city in the Brazilian Amazon as a case study. Based on the database from the government agency that authorises constructions in the city of Belém (City Planning Department - Secretaria Municipal de Urbanismo, SEURB and data from construction companies, the study investigated 274 construction projects from the past 11 years. Factor analysis and work with the variables that can be identified and measured in the initial phase of the project, i.e., during the feasibility study, demonstrate that the physical characteristics of the apartments and the construction project are the primary causes for variations in construction delays; these causes have not yet been reported in the literature. We hope that the results of this study will contribute to more consistent forecasting of construction time, minimising the risk of delays.

  3. BIM integration in education: A case study of the construction technology project Bolt Tower Dolni Vitkovice

    Directory of Open Access Journals (Sweden)

    Venkrbec Vaclav

    2017-12-01

    Full Text Available Building information modeling (BIM can support effectiveness during many activities in the AEC industry. even when processing a construction-technological project. This paper presents an approach how to use building information model in higher education, especially during the work on diploma thesis and it supervision. Diploma thesis is project based work, which aims to compile a construction-technological project for a selected construction. The paper describes the use of input data, working with them and compares this process with standard input data such as printed design documentation. The effectiveness of using the building information model as a input data for construction-technological project is described in the conclusion.

  4. BIM integration in education: A case study of the construction technology project Bolt Tower Dolni Vitkovice

    Science.gov (United States)

    Venkrbec, Vaclav; Bittnerova, Lucie

    2017-12-01

    Building information modeling (BIM) can support effectiveness during many activities in the AEC industry. even when processing a construction-technological project. This paper presents an approach how to use building information model in higher education, especially during the work on diploma thesis and it supervision. Diploma thesis is project based work, which aims to compile a construction-technological project for a selected construction. The paper describes the use of input data, working with them and compares this process with standard input data such as printed design documentation. The effectiveness of using the building information model as a input data for construction-technological project is described in the conclusion.

  5. Project-Based Learning and Student Knowledge Construction during Asynchronous Online Discussion

    Science.gov (United States)

    Koh, Joyce Hwee Ling; Herring, Susan C.; Hew, Khe Foon

    2010-01-01

    Project-based learning engages students in problem solving through artefact design. However, previous studies of online project-based learning have focused primarily on the dynamics of online collaboration; students' knowledge construction throughout this process has not been examined thoroughly. This case study analyzed the relationship between…

  6. Database construction for assessment of chronic radionuclide releases

    International Nuclear Information System (INIS)

    Hively, L.M.; Sjoreen, A.L.; Bledsoe, J.L.

    1986-01-01

    Oak Ridge National Laboratory (ORNL) has developed a comprehensive dose/risk assessment methodology, CRRIS (Computerized Radiological Risk Investigation System), for assessment of atmospheric radionuclide releases (e.g., during decontamination and decommissioning). Radiological effects are calculated for direct atmospheric and ground exposure and for consumption of contaminated agricultural products. Previously, population and agricultural data for CRRIS were tabulated on 1/2-degree square grid cells. This coarse resolution resulted in anomalies such as population in water bodies, agricultural production in city centers, and nonconservation of population over the assessment grid. An even finer mesh (2-minute square grid) is inadequate in densely populated cities where 20,000 or more people live in a square block. These difficulties are overcome by a higher resolution technique using US Census Bureau population data at the most detailed [enumeration district (ED)] level available and by excluding population from unpopulated areas (e.g., water bodies). Agricultural data are available at only the county level and are apportioned to the ED grid according to farm population, conserving the original data. This paper discusses the database construction using Tennessee as an illustration. 10 refs., 2 figs., 1 tab

  7. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects.

    Science.gov (United States)

    Aminbakhsh, Saman; Gunduz, Murat; Sonmez, Rifat

    2013-09-01

    The inherent and unique risks on construction projects quite often present key challenges to contractors. Health and safety risks are among the most significant risks in construction projects since the construction industry is characterized by a relatively high injury and death rate compared to other industries. In construction project management, safety risk assessment is an important step toward identifying potential hazards and evaluating the risks associated with the hazards. Adequate prioritization of safety risks during risk assessment is crucial for planning, budgeting, and management of safety related risks. In this paper, a safety risk assessment framework is presented based on the theory of cost of safety (COS) model and the analytic hierarchy process (AHP). The main contribution of the proposed framework is that it presents a robust method for prioritization of safety risks in construction projects to create a rational budget and to set realistic goals without compromising safety. The framework provides a decision tool for the decision makers to determine the adequate accident/injury prevention investments while considering the funding limits. The proposed safety risk framework is illustrated using a real-life construction project and the advantages and limitations of the framework are discussed. Copyright © 2013 National Safety Council and Elsevier Ltd. All rights reserved.

  8. 41 CFR 102-74.135 - Who selects construction and alteration projects that are to be performed?

    Science.gov (United States)

    2010-07-01

    ... and alteration projects that are to be performed? 102-74.135 Section 102-74.135 Public Contracts and... construction and alteration projects that are to be performed? The Administrator of General Services selects construction and alteration projects to be performed. ...

  9. Standard Ship Test and Inspection Plan, Procedures and Database

    National Research Council Canada - National Science Library

    1999-01-01

    ... construction schedules and increased cost is the area of test and inspection. This project investigates existing rules and regulations for testing and inspection of commercial ships and identifies differences and similarities within the requirements. The results include comparison matrices, a standard test plan, a set of standard test procedures, and a sample test database developed for a typical commercial ship.

  10. Constructing an XML database of linguistics data

    Directory of Open Access Journals (Sweden)

    J H Kroeze

    2010-04-01

    Full Text Available A language-oriented, multi-dimensional database of the linguistic characteristics of the Hebrew text of the Old Testament can enable researchers to do ad hoc queries. XML is a suitable technology to transform free text into a database. A clause’s word order can be kept intact while other features such as syntactic and semantic functions can be marked as elements or attributes. The elements or attributes from the XML “database” can be accessed and proces sed by a 4th generation programming language, such as Visual Basic. XML is explored as an option to build an exploitable database of linguistic data by representing inherently multi-dimensional data, including syntactic and semantic analyses of free text.

  11. A status report on the PBFA II construction project

    International Nuclear Information System (INIS)

    Barr, G.W.; Furaus, J.P.; Cook, D.L.; Shirley, C.G.

    1985-01-01

    The Particle Beam Fusion Accelerator II (PBFA II) is under construction at Sandia National Laboratories (SNL). PBFA II contains 36 individual power modules configured in a stacked radial geometry and synchronized to provide greater than 3.5 MJ of energy into the vacuum section in a single 55-ns-wide 90-TW peak power pulse. This R and D construction project is being implemented in a fast track schedule mode in which final design of the accelerator components occurs in parallel with the construction of the laboratory building and the accelerator tank. PBFA II is scheduled to become operational in January 1986 with its first multi-module shot into an applied-B ion diode that will generate and transport a beam of lithium ions. Plans are now being made for experimental work on PBFA II beyond the construction phase

  12. Identification of shareholder ethics and responsibilities in online reverse auctions for construction projects.

    Science.gov (United States)

    Hatipkarasulu, Yilmaz; Gill, James H

    2004-04-01

    The increasing number of companies providing internet services and auction tools helped popularize the online reverse auction trend for purchasing commodities and services in the last decade. As a result, a number of owners, both public and private, accepted the online reverse auctions as the bidding technique for their construction projects. Owners, while trying to minimize their costs for construction projects, are also required to address their ethical responsibilities to the shareholders. In the case of online reverse auctions for construction projects, the ethical issues involved in the bidding technique directly reflects on the owner's ethical and social responsibilities to their shareholders. The goal of this paper is to identify the shareholder ethics and responsibilities in online reverse auctions for construction projects by analyzing the ethical issues for the parties involved in the process. The identification of the ethical issues and responsibilities requires clear definition and understanding of professional ethics and the roles of the involved parties. In this paper, first, the concept of professional ethics and social responsibility is described in a general form. To illustrate the ethical issues and responsibilities, a sample case of bidding for a construction project using online reverse auction techniques is presented in which the shareholders were actively involved in questioning the ethical issues. The issues involved in the bidding process and their reflection on the shareholder responsibilities are described and analyzed for each stage of the process. A brief discussion of the overall process is also included to address the general ethical issues involved in online reverse auctions.

  13. JICST Factual DatabaseJICST Chemical Substance Safety Regulation Database

    Science.gov (United States)

    Abe, Atsushi; Sohma, Tohru

    JICST Chemical Substance Safety Regulation Database is based on the Database of Safety Laws for Chemical Compounds constructed by Japan Chemical Industry Ecology-Toxicology & Information Center (JETOC) sponsored by the Sience and Technology Agency in 1987. JICST has modified JETOC database system, added data and started the online service through JOlS-F (JICST Online Information Service-Factual database) in January 1990. JICST database comprises eighty-three laws and fourteen hundred compounds. The authors outline the database, data items, files and search commands. An example of online session is presented.

  14. ADASS Web Database XML Project

    Science.gov (United States)

    Barg, M. I.; Stobie, E. B.; Ferro, A. J.; O'Neil, E. J.

    In the spring of 2000, at the request of the ADASS Program Organizing Committee (POC), we began organizing information from previous ADASS conferences in an effort to create a centralized database. The beginnings of this database originated from data (invited speakers, participants, papers, etc.) extracted from HyperText Markup Language (HTML) documents from past ADASS host sites. Unfortunately, not all HTML documents are well formed and parsing them proved to be an iterative process. It was evident at the beginning that if these Web documents were organized in a standardized way, such as XML (Extensible Markup Language), the processing of this information across the Web could be automated, more efficient, and less error prone. This paper will briefly review the many programming tools available for processing XML, including Java, Perl and Python, and will explore the mapping of relational data from our MySQL database to XML.

  15. Towards Integrated Team Practice: A Case of Malaysian Industrialised Building System (IBS Construction Projects

    Directory of Open Access Journals (Sweden)

    Mohd Nawi Mohd Nasrun

    2014-01-01

    Full Text Available Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage, low productivity and efficiency. Integrated team practice is perceived as paramount. Unfortunately, there has a limitation of study focus on the dimension of fully integrated team especially for Malaysian Industrialised Building System (IBS projects. Accordingly, this research paper explores and identifies the dimension of fully integrated team from the traditional approach and conduct a validation process for implementing it in Malaysian IBS projects. The research presented uses interviews case study to obtain qualitative data. It was found that the dimension of fully integrated team from the traditional construction process could apply to the Malaysian IBS projects. Suggestions on how an integrated team practice in IBS design and construction process in order to minimise the fragmentation gaps will be concluded.

  16. Projecting labor demand and worker immigration at nuclear power plant construction sites: an evaluation of methodology

    International Nuclear Information System (INIS)

    Herzog, H.W. Jr; Schlottmann, A.M.; Schriver, W.R.

    1981-12-01

    The study evaluates methodology employed for the projection of labor demand at, and worker migration to, nuclear power plant construction sites. In addition, suggestions are offered as to how this projection methodology might be improved. The study focuses on projection methodologies which forecast either construction worker migration or labor requirements of alternative types of construction activity. Suggested methodological improvements relate both to institutional factors within the nuclear power plant construction industry, and to a better use of craft-specific data on construction worker demand/supply. In addition, the timeliness and availability of the regional occupational data required to support, or implement these suggestions are examined

  17. A Lean Framework for Production Control in Complex and Constrained Construction Projects (PC4P)

    DEFF Research Database (Denmark)

    Lindhard, Søren Munch; Wandahl, Søren

    2014-01-01

    Production conditions in construction are different than in themanufacturing industry. First of all, construction is rooted in place and conducted as on-site manufacturing. Secondly, every construction project is unique and a one-of-a-kind production, managed by a temporary organization consisting...... and constrained construction project. Even though several tools have attempted to add structure and to create order, to the complex, dynamic, and uncertain context in which constructions is conducted, none has yet fully succeeded in providing a robust production control system. With outset in the lean tool Last...

  18. Information richness in construction projects: A critical social theory

    NARCIS (Netherlands)

    Adriaanse, Adriaan Maria; Voordijk, Johannes T.; Greenwood, David

    2002-01-01

    Two important factors influencing the communication in construction projects are the interests of the people involved and the language spoken by the people involved. The objective of the paper is to analyse these factors by using recent insights in the information richness theory. The critical

  19. Performance-based procurement for low disturbance brdige construction projects

    NARCIS (Netherlands)

    Sebastian, R.; Claeson-Jonsson, C.; Di Giulio, R.

    2013-01-01

    Purpose – This paper aims to introduce a method of performance-based procurement, based on the most economically advantageous tender (MEAT), for low-disturbance bridge construction projects in urban environment. Design/methodology/approach – The first part of this paper reviews the key performance

  20. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to a Large Scale Hydropower Construction Project

    Science.gov (United States)

    Xu, Jiuping

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method. PMID:24550708

  1. Multimode resource-constrained multiple project scheduling problem under fuzzy random environment and its application to a large scale hydropower construction project.

    Science.gov (United States)

    Xu, Jiuping; Feng, Cuiying

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method.

  2. Construction projects using alternative materials: a framework to assess their sustainability.

    OpenAIRE

    Fevre-Gautier , Anne-Lise; Beylot , Antoine; Vaxelaire , Stéphane; Michel , Pascale; Brullot , Sabrina; Lannou , Grégory; Stoos , Marion

    2012-01-01

    The increasing use of alternative materials and local solutions for construction projects raises questions about success conditions and criteria for the economic feasibility and global sustainability of such projects. Among others, how can design conditions - especially regarding the decision process - determine their success? We will present the results of a two-years project conducted from February 2010 to March 2012 in collaboration with ADEME (French agency of environment and energy contr...

  3. TcruziDB, an Integrated Database, and the WWW Information Server for the Trypanosoma cruzi Genome Project

    Directory of Open Access Journals (Sweden)

    Degrave Wim

    1997-01-01

    Full Text Available Data analysis, presentation and distribution is of utmost importance to a genome project. A public domain software, ACeDB, has been chosen as the common basis for parasite genome databases, and a first release of TcruziDB, the Trypanosoma cruzi genome database, is available by ftp from ftp://iris.dbbm.fiocruz.br/pub/genomedb/TcruziDB as well as versions of the software for different operating systems (ftp://iris.dbbm.fiocruz.br/pub/unixsoft/. Moreover, data originated from the project are available from the WWW server at http://www.dbbm.fiocruz.br. It contains biological and parasitological data on CL Brener, its karyotype, all available T. cruzi sequences from Genbank, data on the EST-sequencing project and on available libraries, a T. cruzi codon table and a listing of activities and participating groups in the genome project, as well as meeting reports. T. cruzi discussion lists (tcruzi-l@iris.dbbm.fiocruz.br and tcgenics@iris.dbbm.fiocruz.br are being maintained for communication and to promote collaboration in the genome project

  4. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects

    Directory of Open Access Journals (Sweden)

    Yoonseok Shin

    2015-01-01

    Full Text Available Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  5. Alternate performance standard project: Interpreting the post-construction test

    International Nuclear Information System (INIS)

    Williamson, A.D.; McDonough, S.E.

    1993-01-01

    The paper describes the results of a project commissioned by the State of Florida, in cooperation with the US Environmental Protection Agency, as one portion of the Florida Radon Research Program (FRRP). The purpose of the FRRP is to provide technical support for a statewide Building Standard for Radon-Resistant Construction currently in the rulemaking process. In this case the information provides technical background for a post-construction radon test specified as a performance element of the code which accompanies the prescriptive alternative that does not incorporate active radon reduction systems

  6. A model for quantifying construction waste in projects according to the European waste list.

    Science.gov (United States)

    Llatas, C

    2011-06-01

    The new EU challenge is to recover 70% by weight of C&D waste in 2020. Literature reveals that one major barrier is the lack of data. Therefore, this paper presents a model which allows technicians to estimate C&D waste during the design stage in order to promote prevention and recovery. The types and quantities of CW are estimated and managed according to EU guidelines, by building elements and specifically for each project. The model would allow detection of the source of the waste and to adopt other alternative procedures which delete hazardous waste and reduce CW. Likewise, it develops a systematic structure of the construction process, a waste classification system and some analytical expressions which are based on factors. These factors depend on technology and represent a standard on site. It would allow to develop a database of waste anywhere. A Spanish case study is covered. Factors were obtained by studying over 20 dwellings. The source and types of packaging waste, remains, soil and hazardous waste were estimated in detail and were compared with other studies. Results reveal that the model can be implemented in projects and the chances of reducing and recovery C&D waste could be increased, well above the EU challenge. Copyright © 2011 Elsevier Ltd. All rights reserved.

  7. BIM for Construction Site Logistics Management

    Directory of Open Access Journals (Sweden)

    K. Whitlock

    2018-01-01

    Full Text Available Emerging Building Information Modelling (BIM has been hailed as a revolutionary technology and information management process that facilitates collaboration and more efficient design and construction processes through innovative 3D modelling software, open access to information and multidisciplinary integration. The deadline of compliance to BIM level 2 on all public sector centrally procured construction projects has expired leaving many construction firms anxious to adopt BIM. Most common documented applications of BIM have been in the areas of architectural and structural design, quantity surveying, construction project management, and sustainability with very limited peer-reviewed studies on construction logistics management. The aim of this study is to investigate how BIM can be applied to construction logistics management. This study adopts a desk-top approach, with articles sources from renowned scientific databases such as ScienceDirect, Google Scholar and Emerald. The study culminated in the identification of benefits and barriers of adopting BIM for construction logistics management. Given only a desk-top approach has been used, the recommendation for future study is to build on this to conduct an empirical study using both qualitative and quantitative data. This will provide an in-depth understanding of the use of BIM for construction logistics management and open opportunities for further research.

  8. Power Grid Construction Project Portfolio Optimization Based on Bi-level programming model

    Science.gov (United States)

    Zhao, Erdong; Li, Shangqi

    2017-08-01

    As the main body of power grid operation, county-level power supply enterprises undertake an important emission to guarantee the security of power grid operation and safeguard social power using order. The optimization of grid construction projects has been a key issue of power supply capacity and service level of grid enterprises. According to the actual situation of power grid construction project optimization of county-level power enterprises, on the basis of qualitative analysis of the projects, this paper builds a Bi-level programming model based on quantitative analysis. The upper layer of the model is the target restriction of the optimal portfolio; the lower layer of the model is enterprises’ financial restrictions on the size of the enterprise project portfolio. Finally, using a real example to illustrate operation proceeding and the optimization result of the model. Through qualitative analysis and quantitative analysis, the bi-level programming model improves the accuracy and normative standardization of power grid enterprises projects.

  9. The Hydraulic Project Włocławek: Design, Studies, Construction and Operation

    Directory of Open Access Journals (Sweden)

    Wojciech Majewski

    2015-03-01

    Full Text Available The Hydraulic Project Włocławek was commissioned in 1970 as the first barrage of the Lower Vistula Cascade (LVC. The purpose of the LVC was to create an important source of hydro-energy and inland navigation route connecting central Poland with the port city of Gdańsk. Along the Lower Vistula (LV important cities and industrial centres are located. The Włocławek project still remains the only barrage on the LV thus creating a number of problems. The paper presents the basic hydrological and hydraulic data for the Vistula river, and describes the Włocławek project, hydraulic model investigations conducted in the design phase, the construction of the project and the main problems, attendant on its use, including the winter flood of 1982 in the upper part of the Włocławek reservoir. The paper ends with conclusions on project construction and exploitation. The next barrage downstream from Włocławek is proposed.

  10. TECHNICAL AND ECONOMIC SUBSTANTIATION OF PROJECTS OF THE AFFORDABLE HOUSING CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    KRAVCHUNOVSKA T. S.

    2015-12-01

    Full Text Available Summary. Problem statement. The development of inhabitant locality of Ukraine is characterized by significant differences in levels of socio and economic development. An excessive concentration of population and industry in large cities, inefficient, slow development of most medium and small cities, towns and villages, considerable territorial disproportions of economic development of the country, considerable shortcomings in the territorial organization of society are observed. At the same time the tendency of the total area of increasing of inhabitant locality. The lands are used inefficiently. Among the most common problems of inhabitant locality is the housing problem. When making a decision on the design of affordable housing construction is one of the most important stages in the development of the technique and economic substantiation of the project is determination of the advisability and effectiveness of construction. The substantiation of advisability and effectiveness of affordable housing based on the definition of technical and economic indicators of projects, one of the most important among them is the cost, in its calculation is necessary to take into account the influence of organizational and technological factors, reflecting the features of construction in condition of compacted construction. Purpose. Development of methodical recommendations on substantiation of cost construction of affordable housing in the conditions of compacted construction. Conclusion. To provide a processing and the analysis of data is necessary development of the applied software on the basis of the developed block scheme of justification of cost construction of affordable housing.

  11. Case study: Proposed application of project management techniques for construction of nuclear power plant in Malaysia

    International Nuclear Information System (INIS)

    Syahirah Abdul Rahman; Phongsakorn Prak Tom; Wan Abd Hadi Wan Abu Bakar; Shaharum Ramli

    2010-01-01

    This study discusses the techniques of project management for the construction of nuclear power plants that can be used in Malaysia. Nuclear power reactors are expected to apply is the categories of Gen III + reactor where it is safer and more modern than the first generation of reactors built in the 1970s. The objective of this study is that the construction of this reactor to be completed by the stipulated time and not exceed the cost estimates. In addition, project management is also able to meet all the specifications and achieve the quality standard. In this study, the techniques used in project management to ensure the success of construction projects of nuclear power plants are a Gantt Chart, CPM/ PERT and Microsoft Project. From the study, found that these techniques can assist in facilitating the management of the project for the construction of nuclear power plants to ensure that the estimated time and cost can be managed more effectively as well as quality of care. (author)

  12. Prioritization of proposed waste management construction projects for the Waste Management program within the Department of Energy

    International Nuclear Information System (INIS)

    Johnson, J.V.

    1995-01-01

    A prioritization process is used to evaluate and rank proposed construction projects within the Department of Energy's Waste Management program. The process is used to determine which projects should proceed with conceptual design activities. The proposed construction projects are evaluated against a set of criteria which reflect Waste Management priorities. A management review team ranks and scores the projects thereby generating a prioritized list of projects. Despite decreasing budgets and changing political climates, the process has been a successful decision-aiding tool for selecting construction projects to carry out the Waste Management mission within the Department of Energy

  13. A-state- of-the-art report on construction of a bibliographic information database for the ETDE

    International Nuclear Information System (INIS)

    Oh, Jeong Hoon; Kim, Tae Whan; Yi, Ji Ho; Choi, Kwang; Chun, Young Chun; Yoo, Jae Bok; Yoo, An Na

    2001-11-01

    This report describes A State-of-the-Art Report on Construction of a Bibliographic Information Database for the ETDE(Energy Technology Data Excahange). In the energy technology, the data was selected materials, taken necessary information from it. The analyized materials was inputted according to input rule of ETDE format and verified input software (WinFIBRE). With the help of the National Energy information Consortium composed of 8 organizations, domestic information have been gathered and submitted to ETDE/OA for the exchange of bibliographic information. ETDE database is expected to help energy technology information users for their R and D and improvement of energy efficiency through ETIS system

  14. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  15. Critical management practices influencing on-site waste minimization in construction projects.

    Science.gov (United States)

    Ajayi, Saheed O; Oyedele, Lukumon O; Bilal, Muhammad; Akinade, Olugbenga O; Alaka, Hafiz A; Owolabi, Hakeem A

    2017-01-01

    As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities. Copyright © 2016 Elsevier Ltd. All rights reserved.

  16. Radiation environmental impact assessment of radioactive substances of an airport transit storage construction projects

    International Nuclear Information System (INIS)

    Zhang Baozeng; Xia Zitong; Zou Zhaozhuang

    2014-01-01

    Radioactive substances belong to dangerous goods transport aviation. Radioactive substances impoundments construction purpose is to ensure that the radioactive material during transport to transport and the public to achieve full or isolation, the effects of radiation on the human body, property and the environment caused by the control to an acceptable level. According to the relevant national standards and norms, for radiation protection evaluation of project construction of an airport radioactive impoundments, feasibility of the construction project radiation environment. (authors)

  17. Early cost estimating for road construction projects using multiple regression techniques

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2011-12-01

    Full Text Available The objective of this study is to develop early cost estimating models for road construction projects using multiple regression techniques, based on 131 sets of data collected in the West Bank in Palestine. As the cost estimates are required at early stages of a project, considerations were given to the fact that the input data for the required regression model could be easily extracted from sketches or scope definition of the project. 11 regression models are developed to estimate the total cost of road construction project in US dollar; 5 of them include bid quantities as input variables and 6 include road length and road width. The coefficient of determination r2 for the developed models is ranging from 0.92 to 0.98 which indicate that the predicted values from a forecast models fit with the real-life data. The values of the mean absolute percentage error (MAPE of the developed regression models are ranging from 13% to 31%, the results compare favorably with past researches which have shown that the estimate accuracy in the early stages of a project is between ±25% and ±50%.

  18. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    Science.gov (United States)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  19. A Proactive Approach for Change Management and Control on Construction Projects

    OpenAIRE

    CHEN, CHAO

    2015-01-01

    Changes on construction projects present tough and controversial issues. Change is one of the primary reasons for schedule delay and cost overrun, which create negative impact on project performance and profitability. The liability of change and its consequences are major sources of disagreements between project participants, which often lead to disputes or claims.To answer the challenge of change, both industry and academia have developed change management techniques. Many studies have touch...

  20. NEW INSTRUMENTS FOR MANAGEMENT OF CONSTRUCTION PROGRAMS AND PROJECTS IN THE NEW ECONOMY STRUCTURE

    Directory of Open Access Journals (Sweden)

    Silka Dmitriy Nikolaevich

    2017-11-01

    Full Text Available Subject: the new economy structure is directly related to the active application of digital technologies. Economic processes are more formalized and for making administrative decisions it becomes possible to operate in a greater degree with precise criteria and information than probabilistic assumptions. As a subject of research, new tools for managing construction programs and projects are presented. Research objectives: the purpose of the study is to formulate general principles and directions for the digitization of economic relations in investment and construction activities to ensure the effectiveness of implementation of new generation projects. Materials and methods: to achieve the goal, the article shows the composition of state programs and projects in the construction sector and the system problems of their implementation. Organizational methods of increasing their effectiveness are considered. Results: the most promising areas of implementation of new management tools for investment and construction programs and projects are identified. Conclusions: the article shows the current dynamics of changes in technical and socio-economic systems at the level of construction sector. It is pointed out that the tasks of socio-economic nature require the development of unique approaches since the peculiarities of Russian legislation, of the prevailing norms and rules of economic activity prevent the direct replication of successful foreign experience.

  1. Building information models for astronomy projects

    Science.gov (United States)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  2. Effect of organizational structures and types of construction on perceptions of factors contributing to project failure in pakistan

    International Nuclear Information System (INIS)

    Gazder, U.; Khan, R.A.

    2018-01-01

    The construction industry is viewed as the regulator of national economy globally. Its importance in Pakistan has increased greatly because of the involvement of international funding agencies in infrastructure projects. The feasibility of such projects is largely dependent upon the satisfaction of multiple stakeholders. Hence, it is important to explore the factors considered by different construction organizations in evaluating the failure of their projects. This study focuses on providing a rating of factors affecting construction project failures in the construction industry of Karachi. In addition to that, difference in perception between professionals belonging to different construction projects and organizational structures has also been evaluated. The results of this study show that factors related to project planning and management are rated higher by professionals in general. Secondly, it was also observed that client satisfaction and its related factors were rated higher by organizations with project based management structures. (author)

  3. The Comparative Effectiveness of Variants of Construction of Electricity Export Projects

    Directory of Open Access Journals (Sweden)

    Anatoly Vladimirovich Lagerev

    2014-06-01

    Full Text Available The study describes a methodological approach that evaluates the comparative efficiency of construction of export-oriented power plants and transmission lines taking into account the development of power industry in the region and uncertainty (ambiguity of initial information. At the first stage the authors determine socio-economic effects of each project of construction of export-oriented power plants. With the help of optimization models they choose options that can guarantee the balanced and cost-effective development of the regional electric power system. Then using a simulation model the researchers assess commercial viability of previously selected projects. The article applies this approach for selecting the preferred option of electricity export from Eastern Siberia to China. This study shows that the project of CPP based on Kovykta natural gas with electricity transmission line to Chinese border (near Zabaikalsk is more preferable one in comparison with other projects (CPP based on Kansk-Achinsk coal in Krasnoyarsky krai; CPP based on coal in the Republic of Buryatia and Zabaikalsky krai (Olon-Shibirskaya CPP; New Kharanorskaya CPP; CPP based on Mugunsky coal in Irkutskaya oblast

  4. Innovative Organization of Project Activity of Construction Students

    Science.gov (United States)

    Stolbova, I. D.; Aleksandrova, E. P.; Krainova, M. N.

    2017-11-01

    The construction industry competitiveness depends on its equipping with information modeling technologies. This requires training and development of human resources. The advantages of BIM-technologies are considered. The requirements for the specialists capable of promoting information modeling technologies in the construction industry are discussed. For a wide application of BIM-technologies, the problem of training personnel with a new thinking must be solved. When preparing graduates of the major “Construction”, it is necessary to introduce innovative educational technologies aimed at building the students’ ability for team work, competences in the field of modern information and communication technologies, as well as design skills basing on spatial modeling. Graphic training is the first discipline of the professional orientation for construction students. In the context of training it is important to create such learning environment that is close to a professional one. The paper provides the examples of practice-oriented assignments based on the project method in the course of students’ independent work.

  5. Prioritization of Delay Factors for NPP Construction Risk in International Project by Using AHP Methodology

    Energy Technology Data Exchange (ETDEWEB)

    Hossen, Muhammed Mufazzal; Kang, Sunkoo; Kim, Jonghyun [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-10-15

    It is crucial for the nuclear power plant project decision makers and management personnel to identify the actual factors of construction delay and their ranking in order to take preventive actions. NPP project is complex in nature and the construction phase is one of the most key phase which is subject to many factors result from many sources. From experience, nuclear projects have faced challenges similar to other complex mega projects with additional nuclear specific issues and life time cost of nuclear reactor is concentrated upfront as capital cost, and therefore delays in construction may become intolerable in terms of both lost revenues and interest on the capital. Budget over-runs and delays on next generation new build nuclear projects in recent years clearly demonstrate that the nuclear industry continues to repeat its failed management and project control processes of the past. Similar to major infra-structure projects, actual completion times can vary substantially from initial estimates but this uncertainty is too crucial to the nuclear industry due to high levels of capital at risk, for every year a project is delayed the levelized cost of electricity increases by approximately 8-10%. causes of delay, to develop a generalized AHP model for delay factors, and to prioritize the risk in different factors in various levels of construction phase in international turnkey NPP project. This paper describes and prioritizes Nuclear Power Plant (NPP) construction schedule delay factor for turnkey international project. This study also determines the different party's importance in percentage behind the construction schedule delay of NPP which constitutes main contractor (28.4%), regulatory authority (27.3%), financial and country factor (23.5%), and utility (20.8%). Decision makers of nuclear industry can understand the significance of different factors on NPP construction phase and they can apply risk informed decision making to avoid unexpected

  6. Prioritization of Delay Factors for NPP Construction Risk in International Project by Using AHP Methodology

    International Nuclear Information System (INIS)

    Hossen, Muhammed Mufazzal; Kang, Sunkoo; Kim, Jonghyun

    2014-01-01

    It is crucial for the nuclear power plant project decision makers and management personnel to identify the actual factors of construction delay and their ranking in order to take preventive actions. NPP project is complex in nature and the construction phase is one of the most key phase which is subject to many factors result from many sources. From experience, nuclear projects have faced challenges similar to other complex mega projects with additional nuclear specific issues and life time cost of nuclear reactor is concentrated upfront as capital cost, and therefore delays in construction may become intolerable in terms of both lost revenues and interest on the capital. Budget over-runs and delays on next generation new build nuclear projects in recent years clearly demonstrate that the nuclear industry continues to repeat its failed management and project control processes of the past. Similar to major infra-structure projects, actual completion times can vary substantially from initial estimates but this uncertainty is too crucial to the nuclear industry due to high levels of capital at risk, for every year a project is delayed the levelized cost of electricity increases by approximately 8-10%. causes of delay, to develop a generalized AHP model for delay factors, and to prioritize the risk in different factors in various levels of construction phase in international turnkey NPP project. This paper describes and prioritizes Nuclear Power Plant (NPP) construction schedule delay factor for turnkey international project. This study also determines the different party's importance in percentage behind the construction schedule delay of NPP which constitutes main contractor (28.4%), regulatory authority (27.3%), financial and country factor (23.5%), and utility (20.8%). Decision makers of nuclear industry can understand the significance of different factors on NPP construction phase and they can apply risk informed decision making to avoid unexpected

  7. Characteristics of worker accidents on NYSDOT construction projects.

    Science.gov (United States)

    Mohan, Satish; Zech, Wesley C

    2005-01-01

    This paper aims at providing cost-effective safety measures to protect construction workers in highway work zones, based on real data. Two types of accidents that occur in work zones were: (a) construction work area accidents, and (b) traffic accidents involving construction worker(s). A detailed analysis of work zone accidents involving 36 fatalities and 3,055 severe injuries to construction workers on New York State Department of Transportation (NYSDOT) construction projects from 1990 to 2001 established that five accident types: (a) Struck/Pinned by Large Equipment, (b) Trip or Fall (elevated), (c) Contact w/Electrical or Gas Utility, (d) Struck-by Moving/Falling Load, and (e) Crane/Lift Device Failure accounted for nearly 96% of the fatal accidents, nearly 63% of the hospital-level injury accidents, and nearly 91% of the total costs. These construction work area accidents had a total cost of $133.8 million. Traffic accidents that involve contractors' employees were also examined. Statistical analyses of the traffic accidents established that five traffic accident types: (a) Work Space Intrusion, (b) Worker Struck-by Vehicle Inside Work Space, (c) Flagger Struck-by Vehicle, (d) Worker Struck-by Vehicle Entering/Exiting Work Space, and (e) Construction Equipment Struck-by Vehicle Inside Work Space accounted for nearly 86% of the fatal, nearly 70% of the hospital-level injury and minor injury traffic accidents, and $45.4 million (79.4%) of the total traffic accident costs. The results of this paper provide real statistics on construction worker related accidents reported on construction work zones. Potential preventions based on real statistics have also been suggested. The ranking of accident types, both within the work area as well as in traffic, will guide the heavy highway contractor and owner agencies in identifying the most cost effective safety preventions.

  8. Projects of Iberdrola Engineering and Construction on the Flamanville 3 EPR

    International Nuclear Information System (INIS)

    Zornoza, J.; Dumas, H.; Sesma, J. L.; Cubian, B.; Diaz, J. I.

    2013-01-01

    Iberdrola Engineering and Construction is participating during the last 5 years in 5 projects on the Flamanville 3 EPR, both in the nuclear island and conventional island and the pump house. These projects represent a challenge from the technical point of view due to the high requirements applicable to the project because of the experience feedback of the operator EDF and of compliance with new regulations that have emerged since the completion of the last nuclear power station in France. This paper presents the description of these projects, as well as its current status. (Author)

  9. Valuation of Construction Projects Based on of Quantity Scale by using Expert System

    Directory of Open Access Journals (Sweden)

    Entisar Kadhim Rasheed

    2016-02-01

    Full Text Available The subject of an valuation of quality of construction projects is one of the topics which it becomes necessary of the absence of the quantity standards in measuring the control works and the quality valuation standards in constructional projects. In the time being it depends on the experience of the workers which leads to an apparent differences in the valuation. The idea of this research came to put the standards to evaluate the quality of the projects in a special system depending on quantity scale nor quality specifying in order to prepare an expert system “ Crystal “ to apply this special system to able the engineers to valuate the quality of their projects easily and in more accurate ways.

  10. Project management for economical nuclear energy

    International Nuclear Information System (INIS)

    Majerle, P.P.

    2005-01-01

    The price of electricity is significantly influenced by the cost of the initial generation asset. The cost of the initial nuclear generation asset is significantly influenced by the design and construction duration. Negative variations in the cost and duration of actual design and construction have historically impacted the early relative economics of nuclear power generation. Successful management of plant design information will mitigate the risks of the design and construction of future nuclear plants. Information management tools that can model the integrated delivery of large complex projects enable the project owners to accurately evaluate project progress, as well as the economic impact of regulatory, political, or market activities not anticipated in the project execution plan. Significant differences exist in the electrical energy markets, project delivery models, and fuel availability between continents and countries. However, each market and project delivery model is challenged by the need to produce economical electrical energy. The information management system presented in this paper provides a means to capture in a single integrated computerized database the design information developed during plant design, procurement, and construction and to allow this information to be updated and retrieved in real time by all project participants. Utilization of the information management system described herein will enable diverse project teams to rapidly and reliably input, share, and retrieve power plant information, thereby supporting project management's goal to make good on its commitment to the economic promise of tomorrow's nuclear electrical power generation by achieving cost-effective construction. (authors)

  11. CORR Guidelines. Preparing and Conducting Review Missions of Construction Project Readiness for Nuclear Power Plants

    International Nuclear Information System (INIS)

    2013-01-01

    The construction readiness review (CORR) mission for nuclear power plant projects has been established with the aim of conducting peer reviews of construction projects related to nuclear power plants. Such a mission provides a detailed assessment of readiness for construction, construction progress, readiness for turnover, as well as recommendations for improvement. Organizations in Member States, such as nuclear utilities, owners, regulators and technical support organizations, can benefit from such reviews. A team of international experts with complementing specialities will conduct the CORR mission. The review is based on appropriate IAEA publications, such as IAEA Safety Standards Series Guides and IAEA Nuclear Energy Series publications, as well as on internationally recognized project and construction management guides. Mission findings are summarized in a mission report, which includes a list of recommendations, suggestions and identified good practices. The review is not intended to be a regulatory inspection or an audit against international codes and standards. Rather, it is a peer review aimed at improving implementation processes and procedures through an exchange of technical experiences and practices at the working level. The mission is applicable at any stage of a nuclear power plant construction project, although two specific phases are targeted: (1) start of construction mission (Phase 1 mission) and (2) an in-progress mission (Phase 2 mission). Missions are initiated when official requests are submitted by Member States through the appropriate IAEA channels

  12. GHG emission quantification for pavement construction projects using a process-based approach

    Directory of Open Access Journals (Sweden)

    Charinee Limsawasd

    2017-03-01

    Full Text Available Climate change and greenhouse gas (GHG emissions have attracted much attention for their impacts upon the global environment. Initiating of new legislation and regulations for control of GHG emissions from the industrial sectors has been applied to address this problem. The transportation industries, which include operation of road pavement and pavement construction equipment, are the highest GHG-emitting sectors. This study presents a novel quantification model of GHG emissions of pavement construction using process-based analysis. The model is composed of five modules that evaluate GHG emissions. These are: material production and acquisition, (2 material transport to a project site, (3 heavy equipment use, (4 on-site machinery use, and, (5 on-site electricity use. The model was applied to a hypothetical pavement project to compare the environmental impacts of flexible and rigid pavement types during construction. The resulting model can be used for evaluation of environmental impacts, as well as for designing and planning highway pavement construction.

  13. Market trends in the U.S. ESCO industry: Results from the NAESCO database project

    Energy Technology Data Exchange (ETDEWEB)

    Goldman, Charles A.; Osborn, Julie G.; Hopper, Nicole C.; Singer, Terry E.

    2002-05-01

    The U.S. Energy Services Company (ESCO) industry is often cited as the most successful model for the private sector delivery of energy-efficiency services. This study documents actual performance of the ESCO industry in order to provide policymakers and investors with objective information and customers with a resource for benchmarking proposed projects relative to industry performance. We have assembled a database of nearly 1500 case studies of energy-efficiency projects-the most comprehensive data set of the U.S. ESCO industry available. These projects include $2.55B of work completed by 51 ESCOs and span much of the history of this industry. We estimate that the ESCO industry completed $1.8-2.1B of projects in 2000. The industry has grown rapidly over the last decade with revenues increasing at a 24% annualized rate. We summarize and compare project characteristics and costs and analyze energy savings, including the relationship between predicted and actual savings. ESCOs typically invested about $2.30/ft{sup 2} per project in various energy efficiency improvements, although there is large variation in project costs within and across market segments. We find that lighting-only projects report median electricity savings of 47% of targeted equipment consumption; the median for lighting-&-non-lighting projects is 23% of the total electric bill baseline. We examine project economics, including project net benefits, benefit/cost ratio and simple payback time. Median simple payback time is seven years for institutional sector projects and three years in the private sector. We estimate direct economic benefits of $1.62 billion for the 1080 projects in our database with both cost and savings data. The median benefit/cost ratio is 2.1 for 309 private sector projects and 1.6 for 771 institutional sector projects. We discuss the role of policies and programs adopted by state/federal legislatures and agencies that have played an important role in stimulating ESCO activity

  14. CONSTRUCTION PROJECTS VERSUS THE PROTECTION OF NATURE AND ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Elżbieta Hanna Szafranko

    2017-02-01

    Full Text Available Construction investments are related to the economic development of each country. Expansion of towns and settlements, construction, industrial, commercial and recreational objects and the communication network is necessary and results from regional development strategies. For their implementation it is necessary to prepare the area designated for their development. In many regions of our country area suitable for construction are increasingly limited, and furthermore investors often looks for an attractive investment location. For this reason, more and more construction projects dangerously close to areas of high natural value and protected and often are entering the these areas. To minimize the negative investment impact on the environment there are developed several variants of investment. Next, assessing the positive and negative effects, we choose the best, from the point of view of the surrounding environment solution. To illustrate the procedure example of analysis using the method proposed by the author, the indicator is shown.

  15. The EPIC nutrient database project (ENDB): a first attempt to standardize nutrient databases across the 10 European countries participating in the EPIC study

    DEFF Research Database (Denmark)

    Slimani, N.; Deharveng, G.; Unwin, I.

    2007-01-01

    because there is currently no European reference NDB available. Design: A large network involving national compilers, nutritionists and experts on food chemistry and computer science was set up for the 'EPIC Nutrient DataBase' ( ENDB) project. A total of 550-1500 foods derived from about 37 000...... standardized EPIC 24-h dietary recalls (24-HDRS) were matched as closely as possible to foods available in the 10 national NDBs. The resulting national data sets ( NDS) were then successively documented, standardized and evaluated according to common guidelines and using a DataBase Management System...

  16. Commutative algebra constructive methods finite projective modules

    CERN Document Server

    Lombardi, Henri

    2015-01-01

    Translated from the popular French edition, this book offers a detailed introduction to various basic concepts, methods, principles, and results of commutative algebra. It takes a constructive viewpoint in commutative algebra and studies algorithmic approaches alongside several abstract classical theories. Indeed, it revisits these traditional topics with a new and simplifying manner, making the subject both accessible and innovative. The algorithmic aspects of such naturally abstract topics as Galois theory, Dedekind rings, Prüfer rings, finitely generated projective modules, dimension theory of commutative rings, and others in the current treatise, are all analysed in the spirit of the great developers of constructive algebra in the nineteenth century. This updated and revised edition contains over 350 well-arranged exercises, together with their helpful hints for solution. A basic knowledge of linear algebra, group theory, elementary number theory as well as the fundamentals of ring and module theory is r...

  17. Construction of the Database for Tomorrow's Regulatory Activities

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Il S.; Kim, Min C.; Kim, Sang J.; Yu, Seon O.; Lee, Kyung W.; Kim, Ji T.; Koo, Bon H.; Lee, Durk H. [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2010-10-15

    KINS has launched a top brand project since early 2007, which called the 'Tracking System for the Implementation of Nuclear Regulation: RTRACER' The one of main contents of RTRACER is promoting nuclear safety by interconnecting the information of the events and that of safety review and regulatory inspection. R-TRACER is composed of three parts. One is the CATS(Corrective Action Tracking System) to carry out the related affairs and to exchange information between organizations concerned efficiently. Another is the SIMS(Safety Issue Management System) to coordinate the safety issues program and to implement the operating experience feedback in a real-time basis. And the other is the DIOS to supply above both systems with core information. This paper is focused on the database structure of the DIOS

  18. Discussion on the method of environmental radiological impact assessment for the highway construction project

    International Nuclear Information System (INIS)

    Qiu Guohua

    2008-01-01

    Based on the characteristics and environmental radiological impact of the highway construction project, the basic procedure of environmental radiological impact assessment for the highway construction project is put forward, including analysis and determination of contamination sources, selection of evaluation factors, determination of assessment range and dose limit, environmental investigation, environmental impact prediction and assessment. The working method of each procedure is analyzed. (authors)

  19. DataBase on Demand

    International Nuclear Information System (INIS)

    Aparicio, R Gaspar; Gomez, D; Wojcik, D; Coz, I Coterillo

    2012-01-01

    At CERN a number of key database applications are running on user-managed MySQL database services. The database on demand project was born out of an idea to provide the CERN user community with an environment to develop and run database services outside of the actual centralised Oracle based database services. The Database on Demand (DBoD) empowers the user to perform certain actions that had been traditionally done by database administrators, DBA's, providing an enterprise platform for database applications. It also allows the CERN user community to run different database engines, e.g. presently open community version of MySQL and single instance Oracle database server. This article describes a technology approach to face this challenge, a service level agreement, the SLA that the project provides, and an evolution of possible scenarios.

  20. UCIMS: Advances in geotechnical construction and performance monitoring

    Directory of Open Access Journals (Sweden)

    Raphael Siebenmann

    2015-04-01

    Full Text Available The Crossrail project currently under construction in Central London has been described as “The Big Dig on Steroids”, obviously referencing the Central Artery/Tunnel project in Boston completed in 2007. To address the multiple demands for timely construction performance monitoring, Crossrail envisioned the underground construction information management system (UCIMS to monitor construction progress and structural health along the entire route, with a network of geotechnical instruments (i.e. slope inclinometers, extensometers, piezometers, etc. and tunnel boring machine (TBM position information. The UCIMS is a geospatially referenced relational database that was developed using an open source geographic information system (GIS that allowed all stakeholders near immediate feedback of construction performance. The purpose of this article is to provide a brief history of geotechnical and structural monitoring software, to describe the structure and operation of the UCIMS, and to demonstrate how the functionality afforded by this system provided the requisite feedback to the stakeholders. Examples will be given regarding how the data management and visualization concepts incorporated into the UCIMS advanced the geotechnical construction industry.

  1. Measuring Carbon Footprint of Flexible Pavement Construction Project in Indonesia

    Directory of Open Access Journals (Sweden)

    Utomo Dwi Hatmoko Jati

    2018-01-01

    Full Text Available Road infrastructure in Indonesia is mainly dominated by flexible pavement type. Its construction process, however, has raised concerns in terms of its environment impacts. This study aims to track and measure the carbon footprint of flexible pavement. The objectives are to map the construction process in relation to greenhouse gas (GHG emissions, to quantify them in terms of carbon dioxide equivalents (CO2e as generated by the process of production and transportation of raw materials, and the operation of plant off-site and on-site project. Data collection was done by having site observations and interviews with project stakeholders. The results show a total emissions of 70.888 tonnes CO2e, consisting of 34.248 tonnes CO2e (48.31% off-site activities and 36.640 tonnes CO2e (51.687% on-site activities. The two highest CO2e emissions were generated by the use of plant for asphalt concrete laying activities accounted 34.827 tonnes CO2e (49.130%, and material transportation accounted 24.921 (35.155%. These findings provide a new perspective of the carbon footprint in flexible pavement and suggest the urgent need for the use of more efficient and environmentally friendly plant in construction process as it shows the most significant contribution on the CO2e. This study provides valuable understanding on the environmental impact of typical flexible pavement projects in Indonesia, and further can be used for developing green road framework.

  2. Measuring Carbon Footprint of Flexible Pavement Construction Project in Indonesia

    Science.gov (United States)

    Hatmoko, Jati Utomo Dwi; Hidayat, Arif; Setiawati, Apsari; Prasetyo, Stefanus Catur Adi

    2018-02-01

    Road infrastructure in Indonesia is mainly dominated by flexible pavement type. Its construction process, however, has raised concerns in terms of its environment impacts. This study aims to track and measure the carbon footprint of flexible pavement. The objectives are to map the construction process in relation to greenhouse gas (GHG) emissions, to quantify them in terms of carbon dioxide equivalents (CO2e) as generated by the process of production and transportation of raw materials, and the operation of plant off-site and on-site project. Data collection was done by having site observations and interviews with project stakeholders. The results show a total emissions of 70.888 tonnes CO2e, consisting of 34.248 tonnes CO2e (48.31%) off-site activities and 36.640 tonnes CO2e (51.687%) on-site activities. The two highest CO2e emissions were generated by the use of plant for asphalt concrete laying activities accounted 34.827 tonnes CO2e (49.130%), and material transportation accounted 24.921 (35.155%). These findings provide a new perspective of the carbon footprint in flexible pavement and suggest the urgent need for the use of more efficient and environmentally friendly plant in construction process as it shows the most significant contribution on the CO2e. This study provides valuable understanding on the environmental impact of typical flexible pavement projects in Indonesia, and further can be used for developing green road framework.

  3. Working capital management in the process of financial support of investment and construction projects and of the construction material industry

    Science.gov (United States)

    Danilochkina, Nadezhda; Lukmanova, Inessa; Roshchina, Olga; Voytolovskiy, Nikolay

    2018-03-01

    The article presents the analysis of working capital in the process of financial support of high-rise construction investment projects. The factors influencing the choice of the working capital management model were analyzed, the reasons of the change in the requirement for the values of current assets in the process of construction of high-rise facilities were determined. The author has developed the scheme of interrelation between production, operational and financial activity cycles of enterprises implementing investment projects of unique buildings and structures and made a comparative description of their financing sources.

  4. Tourism through Travel Club: A Database Project

    Science.gov (United States)

    Pratt, Renée M. E.; Smatt, Cindi T.; Wynn, Donald E.

    2017-01-01

    This applied database exercise utilizes a scenario-based case study to teach the basics of Microsoft Access and database management in introduction to information systems and introduction to database course. The case includes background information on a start-up business (i.e., Carol's Travel Club), description of functional business requirements,…

  5. Interactive DataBase of Cosmic Ray Anisotropy (DB A10)

    Science.gov (United States)

    Asipenka, A.S.; Belov, A.V.; Eroshenko, E.F.; Klepach, E.G.; Oleneva, V.A.; Yake, V.G.

    Data on the hourly means of cosmic ray density and anisotropy derived by the GSM method over the 1957-2006 are introduced in to MySQL database. This format allowed an access to data both in local and in the Internet. Using the realized combination of script-language Php and My SQL database the Internet project was created on the access for users data on the CR anisotropy in different formats (http://cr20.izmiran.ru/AnisotropyCR/main.htm/). Usage the sheaf Php and MySQL provides fast receiving data even in the Internet since a request and following process of data are accomplished on the project server. Usage of MySQL basis for the storing data on cosmic ray variations give a possibility to construct requests of different structures, extends the variety of data reflection, makes it possible the conformity data to other systems and usage them in other projects.

  6. A study of best management practices for enhancing productivity in building projects: construction methods perspectives

    Directory of Open Access Journals (Sweden)

    Argaw Tarekegn Gurmu

    2016-09-01

    Full Text Available This research investigates management practices that have the potential to enhance productivity in building projects by focusing on construction methods. In phase 1 of the study, face-to-face interviews with nineteen experts were conducted to identify the best management practices for construction methods. The qualitative data analysis reached saturation and resulted in a list of best practices for construction methods that are relevant to the local industry. The second phase used an industry-wide survey to prioritize the best practices. Accordingly, project start-up plan, traffic control plan, machinery positioning strategy, project completion plan, and dynamic site layout plan were shown to be the top five best practices for construction methods. The study also revealed that high levels of implementation of best practices are associated with low levels of project delays. The use of best practices also varied according to the project costs. There were no discernible differences between the top five best practices. The authors suggest that they should be implemented jointly to improve productivity in building projects. Contractors could use the logistic regression model developed, to predict the probability of exceeding a baseline productivity factor and, on that basis, implement corrective actions to achieve the desired level of productivity.

  7. PrimateLit Database

    Science.gov (United States)

    Primate Info Net Related Databases NCRR PrimateLit: A bibliographic database for primatology Top of any problems with this service. We welcome your feedback. The PrimateLit database is no longer being Resources, National Institutes of Health. The database is a collaborative project of the Wisconsin Primate

  8. Assessment of Lean Construction Principles: A Case Study at Semarang Medical Centre Hospital Project

    Directory of Open Access Journals (Sweden)

    Matias Roy Adi Wijaya

    2016-06-01

    Full Text Available The lean construction frameworks have been developed for years to enhance the poor performance of Indonesian project delivery system which influenced by the waste of non-value adding activities. Never the less most of the developments were limited on working process and lack in people empowerment. Toyota Way which integrate working process optimization and people empowerment, was developed as a lean construction frame works. This paper aimed to assess the implementation of Toyota Way principles in project delivery system by observing project’s delivery current state (status quo. The assessment began by conducting a questionnaire survey about Toyota Way implementation which then validated by interview with involved stakeholders and field observation. The assessment showed that project’s stakeholders were still unfamiliar with Toyota Way concept. Although some Toyota Way guidelines have been used in projects completion process such as visual management and training program, it found that those guidelines had not fully implemented. The project delivery system was lack of process focus and concerns more on relationship inter-parties. It also found thatToyota Way implementation will constrained by the difficulties to change the status quo of project delivery. Moreover, it seems that construction projects need practical guidelines to simplify the Toyota Way implementation in project delivery system such as project flow evaluation and system of reflection.

  9. Comparing Performance of Government and Private Clients in Construction Projects: Contractors’ Perspective

    OpenAIRE

    Jati Utomo Dwi Hatmoko; Riqi Radian Khasania

    2016-01-01

    By nature, government and private projects have different characteristics, which influence client performance. This research aims to compare performance of government and private clients in construction projects as perceived by contractors. Six client performance indicators were used, i.e. understanding of project requirements, financial, decision making, management skills, supports for contractor, and client’s attitude. Data were collected through questionnaire surveys filled in by 117 respo...

  10. Analysis of floor technology scheme in open-top construction of nuclear power project

    International Nuclear Information System (INIS)

    Zhang Shuxia; Lu Qinwu; Han Xiaoping

    2014-01-01

    Open-top construction is general technology in Ⅲ generation in nuclear power project. Because traditional floor structure and its form board upholding doesn't meet open-top construction, four floor scheme are presented, whose characters, advantages and disadvantages, and its application are summarized. The research results will help to the application of open-top construction. (authors)

  11. Refactoring databases evolutionary database design

    CERN Document Server

    Ambler, Scott W

    2006-01-01

    Refactoring has proven its value in a wide range of development projects–helping software professionals improve system designs, maintainability, extensibility, and performance. Now, for the first time, leading agile methodologist Scott Ambler and renowned consultant Pramodkumar Sadalage introduce powerful refactoring techniques specifically designed for database systems. Ambler and Sadalage demonstrate how small changes to table structures, data, stored procedures, and triggers can significantly enhance virtually any database design–without changing semantics. You’ll learn how to evolve database schemas in step with source code–and become far more effective in projects relying on iterative, agile methodologies. This comprehensive guide and reference helps you overcome the practical obstacles to refactoring real-world databases by covering every fundamental concept underlying database refactoring. Using start-to-finish examples, the authors walk you through refactoring simple standalone databas...

  12. A searching and reporting system for relational databases using a graph-based metadata representation.

    Science.gov (United States)

    Hewitt, Robin; Gobbi, Alberto; Lee, Man-Ling

    2005-01-01

    Relational databases are the current standard for storing and retrieving data in the pharmaceutical and biotech industries. However, retrieving data from a relational database requires specialized knowledge of the database schema and of the SQL query language. At Anadys, we have developed an easy-to-use system for searching and reporting data in a relational database to support our drug discovery project teams. This system is fast and flexible and allows users to access all data without having to write SQL queries. This paper presents the hierarchical, graph-based metadata representation and SQL-construction methods that, together, are the basis of this system's capabilities.

  13. Individual Learning in Construction Projects: Professions and their Approaches

    Directory of Open Access Journals (Sweden)

    Ingeborg Wasif

    2010-10-01

    Full Text Available New materials, use of sophisticated technologies and increased customer demands, in combination with growing competition among construction companies, have led to a high organizational boundaries. The results indicate that personal networks are the most common source of learning for all professions. While clients, architects, and designers also engage in reading and attending courses, site managers and workers are less engaged in these activities. Experimenting and organizing for learning appear to be underutilized strategies by all professions. This leads to the conclusion that attempts to increase learning have to address the differences in learning behaviours of the various groups. Further, focus on experimenting and organizing for learning is a possibility to change the learning behaviour from learning as a consequence of problems to learning for future improvement.degree of specialization. For successful integration of the different professional specialists, there is a need for shared learning between project co-workers. Based on twenty eight interviews in six different Swedish construction projects, this paper illustrates strategies for individual and shared learning, among different actors and across various

  14. Treatment performances of French constructed wetlands: results from a database collected over the last 30 years.

    Science.gov (United States)

    Morvannou, A; Forquet, N; Michel, S; Troesch, S; Molle, P

    2015-01-01

    Approximately 3,500 constructed wetlands (CWs) provide raw wastewater treatment in France for small communities (Built during the past 30 years, most consist of two vertical flow constructed wetlands (VFCWs) in series (stages). Many configurations exist, with systems associated with horizontal flow filters or waste stabilization ponds, vertical flow with recirculation, partially saturated systems, etc. A database analyzed 10 years earlier on the classical French system summarized the global performances data. This paper provides a similar analysis of performance data from 415 full-scale two-stage VFCWs from an improved database expanded by monitoring data available from Irstea and the French technical department. Trends presented in the first study are confirmed, exhibiting high chemical oxygen demand (COD), total suspended solids (TSS) and total Kjeldahl nitrogen (TKN) removal rates (87%, 93% and 84%, respectively). Typical concentrations at the second-stage outlet are 74 mgCOD L(-1), 17 mgTSS L(-1) and 11 mgTKN L(-1). Pollutant removal performances are summarized in relation to the loads applied at the first treatment stage. While COD and TSS removal rates remain stable over the range of applied loads, the spreading of TKN removal rates increases as applied loads increase.

  15. A Conceptual Grey Analysis Method for Construction Projects

    Directory of Open Access Journals (Sweden)

    Maria Mikela Chatzimichailidou

    2015-05-01

    Full Text Available Concerning engineers, project management is a crucial field of research and development. Projects of high uncertainty and scale are characterized by risk, primarily related to their completion time. Thus, safe duration estimations, throughout the planning of a project, are a key objective for project managers. However, traditional linear approaches fail to include and sufficiently serve the dynamic nature of activities duration. On this ground, attention should be paid to designing and implementing methodologies that approximate the duration of the activities during the phase of planning and scheduling too. The grey analysis mathematical modeling seems to gain grounds, since it gradually becomes a well-adapted and up-to-date technique for numerous scientific sectors. This paper examines the contribution of the logic behind the aforementioned analysis, aiming to predict possible future divergences of task durations in big construction projects. Based on time observations of critical instances, a conceptual method is developed for making duration estimations and communicating deviations from the original schedule, in a way that approximations will fit reality better. The whole procedure endeavors to investigate the decrease of uncertainty, regarding project completion time and reduce, up to a scale, a possible inaccurate estimation of a project manager. The utmost effort is about exploiting the gained experience and eliminating the “hedgehog syndrome”. This is attainable by designing a reliable, easily updated, and readable information system. An enlightening example is to be found in the last section.

  16. Multi-model-based Access Control in Construction Projects

    Directory of Open Access Journals (Sweden)

    Frank Hilbert

    2012-04-01

    Full Text Available During the execution of large scale construction projects performed by Virtual Organizations (VO, relatively complex technical models have to be exchanged between the VO members. For linking the trade and transfer of these models, a so-called multi-model container format was developed. Considering the different skills and tasks of the involved partners, it is not necessary for them to know all the models in every technical detailing. Furthermore, the model size can lead to a delay in communication. In this paper an approach is presented for defining model cut-outs according to the current project context. Dynamic dependencies to the project context as well as static dependencies on the organizational structure are mapped in a context-sensitive rule. As a result, an approach for dynamic filtering of multi-models is obtained which ensures, together with a filtering service, that the involved VO members get a simplified view of complex multi-models as well as sufficient permissions depending on their tasks.

  17. A Model Suggestion to Predict Leverage Ratio for Construction Projects

    OpenAIRE

    Özlem Tüz; Şafak Ebesek

    2013-01-01

    Due to the nature, construction is an industry with high uncertainty and risk. Construction industry carries high leverage ratios. Firms with low equities work in big projects through progress payment system, but in this case, even a small negative in the planned cash flows constitute a major risk for the company.The use of leverage, with a small investment to achieve profit targets large-scale, high-profit, but also brings a high risk with it. Investors may lose all or the portion of th...

  18. A successful waste stream analysis on a large construction project in a radiologically controlled area

    International Nuclear Information System (INIS)

    Kennicott, M.; Richardson, D.; Starke, T.P.

    1997-01-01

    The Los Alamos National Laboratory (the Laboratory) Chemistry and Metallurgy Research (CMR) Facility, constructed in 1952, is currently under going a major, multi-year demolition and construction project. Many of the operations required under this project (i.e., design, demolition, decontamination, construction, and waste management) mimic the processes required of a large scale decontamination and decommissioning (D and D) job and are identical to the requirements of any of several upgrades projects anticipated for the laboratory and other Department of Energy (DOE) sites. For these reasons the CMR upgrades Project is seen as an ideal model facility--to test the application and measure the success of waste minimization techniques which could be implemented for any similar projects. The purpose of this paper will be to discuss the successful completion of a waste stream analysis. The analyses performed was to measure the potential impact of waste generation, in terms of volume and costs, for a reconfiguration option being considered to change the approach and execution of the original project

  19. Database specification for the Worldwide Port System (WPS) Regional Integrated Cargo Database (ICDB)

    Energy Technology Data Exchange (ETDEWEB)

    Faby, E.Z.; Fluker, J.; Hancock, B.R.; Grubb, J.W.; Russell, D.L. [Univ. of Tennessee, Knoxville, TN (United States); Loftis, J.P.; Shipe, P.C.; Truett, L.F. [Oak Ridge National Lab., TN (United States)

    1994-03-01

    This Database Specification for the Worldwide Port System (WPS) Regional Integrated Cargo Database (ICDB) describes the database organization and storage allocation, provides the detailed data model of the logical and physical designs, and provides information for the construction of parts of the database such as tables, data elements, and associated dictionaries and diagrams.

  20. Korea-NEA Research Project for the Construction of Worldwide Reactor Physics Experiments Database and the Foundation of Sustainable Collaboration Environment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sang Ji; Jang, Jin Wook

    2004-07-15

    740 documents on PWR, LMR and VHTR related critical experiments are procured by participating in the IRPhE Project under the auspices of the OECD/NEA Data Bank. These documents were reviewed in detail for classification, measurement technique study. Among the database, the SNEAK-7 critical benchmarks were selected for further analysis by modern analysis tool, which requires minimum amount of correction for the raw calculated value. The SNEAK-7A and 7B were selected due to their spectrum similarity with KALIMER-600. Core eigenvalue, spectral indices, central material worths were evaluated and compared with the measurement. JEF-2.2 predict core eigenvalues pretty well, while the conversion ratio was underestimated by about 3%. ENDF/B-VI overestimates core eigenvalue by about 500 pcm while the conversion ratio was underestimated by about 4%. Through the sensitivity analysis of core eigenvalue to the partial cross section, a problem in {sup 238}U capture cross section was identified and a necessity arose to reduce the measurement uncertainty of {sup 239}Pu due to the high high sensitivity of core eigenvalue to {sup 239}Pu fission cross section.

  1. Identifying the Critical Factors Affecting Safety Program Performance for Construction Projects within Pakistan Construction Industry

    Directory of Open Access Journals (Sweden)

    Zubair Ahmed Memon

    2013-04-01

    Full Text Available Many studies have shown that the construction industry one of the most hazardous industries with its high rates of fatalities and injuries and high financial losses incurred through work related accident. To reduce or overcome the safety issues on construction sites, different safety programs are introduced by construction firms. A questionnaire survey study was conducted to highlight the influence of the Construction Safety Factors on safety program implementation. The input from the questionnaire survey was analyzed by using AIM (Average Index Method and rank correlation test was conducted between different groups of respondents to measure the association between different groups of respondent. The finding of this study highlighted that management support is the critical factor for implementing the safety program on projects. From statistical test, it is concluded that all respondent groups were strongly in the favor of management support factor as CSF (Critical Success Factor. The findings of this study were validated on selected case studies. Results of the case studies will help to know the effect of the factors on implementing safety programs during the execution stage.

  2. Measurement plan and observational construction program on drift excavation at the Horonobe Underground Research Laboratory project

    International Nuclear Information System (INIS)

    Yamasaki, Masanao; Yamaguchi, Takehiro; Funaki, Hironori; Fujikawa, Daisuke; Tsusaka, Kimikazu

    2008-09-01

    The Horonobe URL Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe, northern Hokkaido. The project consists of two major research areas, 'Geoscientific Research' and 'R and D' on Geological Disposal', and proceeds in three overlapping phases, 'Phase I: Surface-based investigation', 'Phase II: Construction' and 'Phase III: Operation', over a period of 20 years. On the Horonobe URL Project, 'Phase 1' was finished in 2005FY and construction of the underground facility was started since then. Now, 'Phase 2' (investigations during construction of the underground facilities) is on-going. On the 'Development of engineering techniques for use in the deep underground environment' in Phase 1, based on the various types of data acquired on investigations from the surface, the design of underground facility in advance was planned. At the inception of the Phase II investigations, an investigation report titled 'Measurement Plan and Observational Construction Program on Shaft Excavation at the Horonobe URL Project' (hereinafter referred to as 'Observational Construction Program') was published. The Observational Construction Program summarizes followings from the Phase I investigations: measurements for safety/reasonable construction, measurements for R and D on enhancement of shaft design/construction technology, and measurements for verification of the deep geological environment model estimated before shaft excavation, and it is on-going. This report summarizes the measurement plan during construction of drifts based on the design in advance and the observational construction program for feedback measurements data into design and construction on subsequent steps. This report also describes about design and construction management program of underground facility and R and D program on

  3. Gateway to the Syriac Saints: A Database Project

    Directory of Open Access Journals (Sweden)

    Jeanne-Nicole Mellon Saint-Laurent

    2016-04-01

    Full Text Available This article describes The Gateway to the Syriac Saints, a database project developed by the Syriac Reference Portal (www.syriaca.org. It is a research tool for the study of Syriac saints and hagiographic texts. The Gateway to the Syriac Saints is a two-volume database: 1 Qadishe and 2 Bibliotheca Hagiographica Syriaca Electronica (BHSE. Hagiography, the lives of the saints, is a multiform genre. It contains elements of myth, history, biblical exegesis, romance, and theology. The production of saints’ lives blossomed in late antiquity alongside the growth of the cult of the saints. Scholars have attended to hagiographic traditions in Greek and Latin, but many scholars have yet to discover the richness of Syriac hagiographic literature: the stories, homilies, and hymns on the saints that Christians of the Middle East told and preserved. It is our hope that our database will give scholars and students increased access to these traditions to generate new scholarship. The first volume, Qadishe or “saints” in Syriac, is a digital catalogue of saints or holy persons venerated in the Syriac tradition. Some saints are native to the Syriac-speaking milieu, whereas others come from other linguistic or cultural traditions. Through the translation of their hagiographies and the diffusion of saints’ cults in the late antique world, saints were adopted, “imported,” and appropriated into Syriac religious memory. The second volume, the BHSE, focuses on Syriac hagiographic texts. The BHSE contains the titles of over 1000 Syriac stories, hymns, and homilies on saints. It also includes authors’ or hagiographers’ names, the first and last lines of the texts (in Syriac, English, and French, bibliographic information, and the names of the manuscripts containing these hagiographic works. We have also listed modern and ancient translations of these works. All of the data in the Gateway to the Syriac Saints has been encoded in TEI, and it is fully

  4. Croatian repository construction project - present status and main obstacles

    International Nuclear Information System (INIS)

    Kucar Dragicevic, S.; Subasic, D.; Schaller, A.; Lokner, V.; Cerskov Klika, M.

    1999-01-01

    Croatia has been preparing backgrounds for the construction of the repository for low and intermediate radioactive waste on its territory, almost for a decade, now. In the name of Hrvtaska elektroprivreda, the co-owner of the NE Krsko, APO has been co-ordinating and organising numerous activities and projects during that time period. Siting process, safety assessment, disposal technology and repository design and public acceptance issues are the main fields of activities. The overall status of the project at the moment, including the overview of the present status of the main four aspects of activities, will be presented. Relatively, big and important progress made on the project work out during the last two years, as well as the main obstacles we were faced with during that time period, will be discussed.(author)

  5. BASIC ACTUAL AND EFFECTIVENESS OF LEADERSHIP STYLES OF CONSTRUCTION PROJECT MANAGERS IN SURABAYA

    Directory of Open Access Journals (Sweden)

    Andi Andi

    2004-01-01

    Full Text Available Leading is one of the most important facets in managing construction projects, and behaving as an effective leader is a vital project manager’s responsibility to ensure that work efforts of other persons are directed toward the accomplishment of organizational objectives. This paper aims to determine basic and actual leadership styles of construction project managers in Surabaya. The effectiveness of the actual leadership style is also examined. To accomplish the objective, the paper first briefly reviews the ways in which leadership is approached. Data were then collected through an empirical survey to 46 project managers, taking Fiedler and Hersey-Blanchard’s models as the point of departure. The results indicate that the basic leadership of project managers in Surabaya falls slightly on task-oriented behavior. Meanwhile selling is the most common style used as actual leadership in practice. The paper discusses the effectiveness of the styles adopted and situational variables affecting.

  6. Applying data mining techniques to explore factors contributing to occupational injuries in Taiwan's construction industry.

    Science.gov (United States)

    Cheng, Ching-Wu; Leu, Sou-Sen; Cheng, Ying-Mei; Wu, Tsung-Chih; Lin, Chen-Chung

    2012-09-01

    Construction accident research involves the systematic sorting, classification, and encoding of comprehensive databases of injuries and fatalities. The present study explores the causes and distribution of occupational accidents in the Taiwan construction industry by analyzing such a database using the data mining method known as classification and regression tree (CART). Utilizing a database of 1542 accident cases during the period 2000-2009, the study seeks to establish potential cause-and-effect relationships regarding serious occupational accidents in the industry. The results of this study show that the occurrence rules for falls and collapses in both public and private project construction industries serve as key factors to predict the occurrence of occupational injuries. The results of the study provide a framework for improving the safety practices and training programs that are essential to protecting construction workers from occasional or unexpected accidents. Copyright © 2011 Elsevier Ltd. All rights reserved.

  7. The Developmental Lexicon Project: A behavioral database to investigate visual word recognition across the lifespan.

    Science.gov (United States)

    Schröter, Pauline; Schroeder, Sascha

    2017-12-01

    With the Developmental Lexicon Project (DeveL), we present a large-scale study that was conducted to collect data on visual word recognition in German across the lifespan. A total of 800 children from Grades 1 to 6, as well as two groups of younger and older adults, participated in the study and completed a lexical decision and a naming task. We provide a database for 1,152 German words, comprising behavioral data from seven different stages of reading development, along with sublexical and lexical characteristics for all stimuli. The present article describes our motivation for this project, explains the methods we used to collect the data, and reports analyses on the reliability of our results. In addition, we explored developmental changes in three marker effects in psycholinguistic research: word length, word frequency, and orthographic similarity. The database is available online.

  8. The use of interorganisational ICT in United States construction projects

    NARCIS (Netherlands)

    Adriaanse, Adriaan Maria; Voordijk, Johannes T.; Dewulf, Geert P.M.R.

    2010-01-01

    In recent research, the use of ICT applications in real time construction projects have been documented and analysed extensively. However, there is a need for identifying and analysing in-depth the mechanisms influencing the use of interorganisational ICT applications and for solutions to eliminate

  9. An Index to Measure Sustainability of a Business Project in the Construction Industry: Lithuanian Case

    Directory of Open Access Journals (Sweden)

    Nomeda Dobrovolskienė

    2015-12-01

    Full Text Available The continuous growth of the world population, resource scarcity and the threat of climate change pose numerous environmental and social problems to the world. Therefore, much hope is put in the concept of sustainability. Companies are increasingly coming under strong global pressure to incorporate sustainability considerations into their project decision-making process. Business projects in the construction industry are among the most important, as this sector is one of the largest sectors and of major importance for the national economy and therefore has a huge impact on the environment and society. Thus, we have to explore ways to integrate sustainability into the management of those projects. This paper presents a composite sustainability index of a project (CSIP which has been created following a review of existing literature and a pilot research study. A pilot research study was conducted in the Lithuanian construction industry between January 2015 and June 2015. Sustainability criteria were chosen and grouped on the basis of the analysis of the literature and different standards relating to sustainability applicable in the construction industry. A survey was used to select and rank the most important sustainability criteria. The index was constructed using multi-criteria decision-making methods. The results of the pilot study revealed that practitioners in the Lithuanian construction sector attach most importance to 15 sustainability criteria. A composite sustainability index of a project combining all these criteria may be useful in assessing the sustainability of a business project and making decisions regarding project portfolio selection and financial resource allocation. When addressing the issue of financial resource allocation in a project portfolio, the decision-maker could take into account not only the project’s return and risk, but also its sustainability. The understanding of this study should enable companies to execute

  10. Project risk management in the construction of high-rise buildings

    Science.gov (United States)

    Titarenko, Boris; Hasnaoui, Amir; Titarenko, Roman; Buzuk, Liliya

    2018-03-01

    This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric "contamination" was developed.

  11. Risk assessment for construction projects of transport infrastructure objects

    Science.gov (United States)

    Titarenko, Boris

    2017-10-01

    The paper analyzes and compares different methods of risk assessment for construction projects of transport objects. The management of such type of projects demands application of special probabilistic methods due to large level of uncertainty of their implementation. Risk management in the projects requires the use of probabilistic and statistical methods. The aim of the work is to develop a methodology for using traditional methods in combination with robust methods that allow obtaining reliable risk assessments in projects. The robust approach is based on the principle of maximum likelihood and in assessing the risk allows the researcher to obtain reliable results in situations of great uncertainty. The application of robust procedures allows to carry out a quantitative assessment of the main risk indicators of projects when solving the tasks of managing innovation-investment projects. Calculation of damage from the onset of a risky event is possible by any competent specialist. And an assessment of the probability of occurrence of a risky event requires the involvement of special probabilistic methods based on the proposed robust approaches. Practice shows the effectiveness and reliability of results. The methodology developed in the article can be used to create information technologies and their application in automated control systems for complex projects.

  12. Bayesian-network-based safety risk analysis in construction projects

    International Nuclear Information System (INIS)

    Zhang, Limao; Wu, Xianguo; Skibniewski, Miroslaw J.; Zhong, Jingbing; Lu, Yujie

    2014-01-01

    This paper presents a systemic decision support approach for safety risk analysis under uncertainty in tunnel construction. Fuzzy Bayesian Networks (FBN) is used to investigate causal relationships between tunnel-induced damage and its influential variables based upon the risk/hazard mechanism analysis. Aiming to overcome limitations on the current probability estimation, an expert confidence indicator is proposed to ensure the reliability of the surveyed data for fuzzy probability assessment of basic risk factors. A detailed fuzzy-based inference procedure is developed, which has a capacity of implementing deductive reasoning, sensitivity analysis and abductive reasoning. The “3σ criterion” is adopted to calculate the characteristic values of a triangular fuzzy number in the probability fuzzification process, and the α-weighted valuation method is adopted for defuzzification. The construction safety analysis progress is extended to the entire life cycle of risk-prone events, including the pre-accident, during-construction continuous and post-accident control. A typical hazard concerning the tunnel leakage in the construction of Wuhan Yangtze Metro Tunnel in China is presented as a case study, in order to verify the applicability of the proposed approach. The results demonstrate the feasibility of the proposed approach and its application potential. A comparison of advantages and disadvantages between FBN and fuzzy fault tree analysis (FFTA) as risk analysis tools is also conducted. The proposed approach can be used to provide guidelines for safety analysis and management in construction projects, and thus increase the likelihood of a successful project in a complex environment. - Highlights: • A systemic Bayesian network based approach for safety risk analysis is developed. • An expert confidence indicator for probability fuzzification is proposed. • Safety risk analysis progress is extended to entire life cycle of risk-prone events. • A typical

  13. Lake Robertson hydroelectric project. Construction of a roller compacted concrete dam

    Energy Technology Data Exchange (ETDEWEB)

    Labelle, M.; Robitaille, F. [Hydro-Quebec, Montreal, PQ (Canada)

    1995-12-31

    Construction of the Lake Robertson hydroelectric project on Quebec`s Lower North Shore was discussed in detail. The dam and powerhouse, located on the HaHa River, consists of a 134 m long concrete gravity dam, and a 21 MW powerhouse with two 69 kV transmission lines and four substations. The climate, terrain, and geography of the region, all of them characterized as severe, and the logistics of construction of the dam and power lines, aggravated by the isolation and severe conditions at the site, were described. The roller compacted concrete design and construction were noted, and justification for a concrete dam over an earth-fill dam was provided. Economics, properties, and composition of the roller compacted concrete (RCC) were examined, and control test results for the RCC concrete were provided. The use of RCC for the Lake Robertson development was described as successful in terms of the quality, watertightness, and completion time. The experience gained by the participants will make it possible to offer RCC as an alternative on various other projects. 2 figs.

  14. Glance project: a database retrieval mechanism for the ATLAS detector

    Energy Technology Data Exchange (ETDEWEB)

    Maidantchik, C [COPPE, UFRJ (Brazil); Grael, F F; Galvao, K K [Escola Politecnica, UFRJ (Brazil); Pommes, K [CERN (Switzerland)

    2008-07-15

    During the construction and commissioning phases of the ATLAS detector, data related to the installation, placement, testing and performance of the equipment are stored in relational databases. Each group acquires and saves information in different servers, using diverse technologies, data modeling and terminologies. Installation and maintenance during the experiment construction and operation depends on the access to this information, as well as imply in its update. The development of retrieval and update systems for each data set requires too much effort and high maintenance cost. The Glance system retrieves and inserts/updates data independently of the modeling and technology used for the storage, recognizes the repositories internal structure and guides the user through the creation of search and insertion interfaces. Distinct and spread data sets can be transparently integrated in one interface. Data can be exported/imported to/from various formats. The system handles many independent interfaces, which can be accessed by users or other applications at any time. This paper describes the Glance conception, its development and features. The system usage is illustrated with examples. Current status and future work are also discussed.

  15. Constructions and classifications of projective Poisson varieties.

    Science.gov (United States)

    Pym, Brent

    2018-01-01

    This paper is intended both as an introduction to the algebraic geometry of holomorphic Poisson brackets, and as a survey of results on the classification of projective Poisson manifolds that have been obtained in the past 20 years. It is based on the lecture series delivered by the author at the Poisson 2016 Summer School in Geneva. The paper begins with a detailed treatment of Poisson surfaces, including adjunction, ruled surfaces and blowups, and leading to a statement of the full birational classification. We then describe several constructions of Poisson threefolds, outlining the classification in the regular case, and the case of rank-one Fano threefolds (such as projective space). Following a brief introduction to the notion of Poisson subspaces, we discuss Bondal's conjecture on the dimensions of degeneracy loci on Poisson Fano manifolds. We close with a discussion of log symplectic manifolds with simple normal crossings degeneracy divisor, including a new proof of the classification in the case of rank-one Fano manifolds.

  16. Constructions and classifications of projective Poisson varieties

    Science.gov (United States)

    Pym, Brent

    2018-03-01

    This paper is intended both as an introduction to the algebraic geometry of holomorphic Poisson brackets, and as a survey of results on the classification of projective Poisson manifolds that have been obtained in the past 20 years. It is based on the lecture series delivered by the author at the Poisson 2016 Summer School in Geneva. The paper begins with a detailed treatment of Poisson surfaces, including adjunction, ruled surfaces and blowups, and leading to a statement of the full birational classification. We then describe several constructions of Poisson threefolds, outlining the classification in the regular case, and the case of rank-one Fano threefolds (such as projective space). Following a brief introduction to the notion of Poisson subspaces, we discuss Bondal's conjecture on the dimensions of degeneracy loci on Poisson Fano manifolds. We close with a discussion of log symplectic manifolds with simple normal crossings degeneracy divisor, including a new proof of the classification in the case of rank-one Fano manifolds.

  17. Analysis of Cost of Rework on Time and Cost Performance of Building Construction Projects in Abuja, Nigeria

    Directory of Open Access Journals (Sweden)

    Emmanuel Chidiebere Eze

    2018-01-01

    Full Text Available Rework is a menace that leads to undesired and unnecessary loss of efforts, it degrades project cost and schedule performance of construction projects, both at design and construction phases. This study therefore, analyzed the impact of cost of rework on time and cost performance of building construction projects in Nigerian, using selected commercial building project within the country’s capital. A pro forma was adopted for gathering data on rework cost, project cost and time of selected building projects, while structured questionnaire was used to collect information on the likely measures for reducing rework incidences from construction professionals that were involved in the delivery of the identified projects. Regression analysis, relative importance index and Kruskal-Walis test were employed for data analysis. The study revealed a significant relationship between the cost of rework and initial and final project cost of delivering commercial buildings, as an average of 3.53% impact on the initial project cost, 46.60% contribution to cost overrun, and p-value of 0.000 was observed on all assessed projects. For the project delivery time, a significant relationship between the cost of rework and initial and final project duration, as an average of 7.35% impact on the initial delivery time, extra 19 days and p-value of 0.000 was observed on all assessed projects. Team building and education, management commitment, employee involvement, were some of the best possible measures to minimized rework problems.

  18. A model of how features of construction projects influence accident occurrence

    OpenAIRE

    Manu, P.

    2017-01-01

    This book chapter in "Valuing People in Construction" (edited by Emuze, F. and Smallwood, J.) presents a study which sought empirical verification of a model of how construction project features (CPFs) influence accident occurrence. A qualitative strategy, in particular phenomenology, involving a range of in-depth interviews with practitioners was used and the findings were subsequently validated using a credibility check involving a survey. Altogether, the findings of the interviews and cred...

  19. User-inspired design methodology using Affordance Structure Matrix (ASM) for construction projects

    OpenAIRE

    Maheswari J. Uma; Charlesraj V. Paul C.; Battacharya Soma

    2017-01-01

    Traditionally, design phase of construction projects is often performed with incomplete and inaccurate user preferences. This is due to inefficiencies in the methodologies used for capturing the user requirements that can subsequently lead to inconsistencies and result in non-optimised end-result. Iterations and subsequent reworks due to such design inefficiencies is one of the major reasons for unsuccessful project delivery as they impact project performance measures such as time and cost am...

  20. An Internet enabled impact limiter material database

    Energy Technology Data Exchange (ETDEWEB)

    Wix, S.; Kanipe, F.; McMurtry, W.

    1998-09-01

    This paper presents a detailed explanation of the construction of an interest enabled database, also known as a database driven web site. The data contained in the internet enabled database are impact limiter material and seal properties. The technique used in constructing the internet enabled database presented in this paper are applicable when information that is changing in content needs to be disseminated to a wide audience.

  1. An Internet enabled impact limiter material database

    International Nuclear Information System (INIS)

    Wix, S.; Kanipe, F.; McMurtry, W.

    1998-01-01

    This paper presents a detailed explanation of the construction of an interest enabled database, also known as a database driven web site. The data contained in the internet enabled database are impact limiter material and seal properties. The technique used in constructing the internet enabled database presented in this paper are applicable when information that is changing in content needs to be disseminated to a wide audience

  2. LandIT Database

    DEFF Research Database (Denmark)

    Iftikhar, Nadeem; Pedersen, Torben Bach

    2010-01-01

    and reporting purposes. This paper presents the LandIT database; which is result of the LandIT project, which refers to an industrial collaboration project that developed technologies for communication and data integration between farming devices and systems. The LandIT database in principal is based...... on the ISOBUS standard; however the standard is extended with additional requirements, such as gradual data aggregation and flexible exchange of farming data. This paper describes the conceptual and logical schemas of the proposed database based on a real-life farming case study....

  3. Towards the use of knotworking for increasing innovation in construction projects

    DEFF Research Database (Denmark)

    Klitgaard, Anne; Beck, Frederikke; Andersen, Michael

    2017-01-01

    Knotworking is an emerging collaboration form in the built environment, which promises to encourage innovation at Construction project level. This study of knotworking processes is part of a larger research program about collaboration in the built environment. In this study of Knotworking......, the focus has been on how the participating organizations and professionals can learn how to participate in knotworking. A facilitator was introduced to establish how facilitators can assist the participating organizations in a construction project to learn to produce knowledge and innovation through...... knotworking. The theoretical foundation is Activity Theory, the data collection method derives from applied ethnomethodology using a blend of video recording and participant observation. The data has been collected in a series of planning meetings and one workshop about building a new kindergarten...

  4. Positive experience in the construction and project management of Kashiwazaki-Kariwa no. 6 and no. 7

    International Nuclear Information System (INIS)

    Minematsu, A.

    1999-01-01

    Kashiwazaki-Kariwa No.6 and No.7 (K-6/7), the world first Advanced Boiling Water Reactor (ABWR) units, started commercial operations on November 7, 1996 and July 2, 1997 respectively. ABWR has been developed as a standard design of the next generation BWR to meet common goals set by the Japanese electric utilities and BWR manufacturers (GE, Hitachi and Toshiba) based on our design, construction, operation and maintenance experience of nuclear power plants. The construction of K-6/7 and confirmatory tests for the verification of the first-of-a-kind (FOAK) design features of ABWR were conducted smoothly without any delay. The duration of the construction was 51.5 months. It was shorter than conventional BWRs in Japan by nearly one year. This was realized by design features of ABWR for better constructability, a principle of 'test before use' applied to the FOAKs, advanced construction technology, detailed engineering at very early stages of the project, and good construction management. The positive experience in the K-6/7 project is now being reviewed and standardized for next ABWR projects. The data and knowledge accumulated through the K-6/7 project will be utilized effectively with the aide of the latest information technology. (author)

  5. Anomalies and contradictions in an airport construction project: a historical analysis based on Cultural-Historical Activity Theory.

    Science.gov (United States)

    Lopes, Manoela Gomes Reis; Vilela, Rodolfo Andrade de Gouveia; Querol, Marco Antônio Pereira

    2018-02-19

    Large construction projects involve the functioning of a complex activity system (AS) in network format. Anomalies such as accidents, delays, reworks, etc., can be explained by contradictions that emerge historically in the system. The aim of this study was to analyze the history of an airport construction project to understand the current contradictions and anomalies in the AS and how they emerged. A case study was conducted for this purpose, combining Collective Work Analysis, interviews, observations, and analysis of documents that provided the basis for sessions in the Change Laboratory, where a participant timeline was elaborated with the principal events during the construction project. Based on the timeline, a historical analysis of the airport's AS revealed critical historical events and contradictions that explained the anomalies that occurred during the project. The analysis showed that the airport had been planned for construction with politically determined deadlines that were insufficient and inconsistent with the project's complexity. The choice of the contract modality, which assigned responsibility to a joint venture for all of the project's phases, was another critical historical event, because it allowed launching the construction before a definitive executive project had been drafted. There were also different cultures in companies working together for the first time in the context of a project with time pressures and outsourcing of activities without the necessary coordination. Identifying these contradictions and their historical origins proved essential for understanding the current situation and efforts to prevent similar situations in the future.

  6. Market trends in the U.S. ESCO industry: Results from the NAESCO database project; TOPICAL

    International Nuclear Information System (INIS)

    Goldman, Charles A.; Osborn, Julie G.; Hopper, Nicole C.; Singer, Terry E.

    2002-01-01

    The U.S. Energy Services Company (ESCO) industry is often cited as the most successful model for the private sector delivery of energy-efficiency services. This study documents actual performance of the ESCO industry in order to provide policymakers and investors with objective information and customers with a resource for benchmarking proposed projects relative to industry performance. We have assembled a database of nearly 1500 case studies of energy-efficiency projects-the most comprehensive data set of the U.S. ESCO industry available. These projects include$2.55B of work completed by 51 ESCOs and span much of the history of this industry. We estimate that the ESCO industry completed$1.8-2.1B of projects in 2000. The industry has grown rapidly over the last decade with revenues increasing at a 24% annualized rate. We summarize and compare project characteristics and costs and analyze energy savings, including the relationship between predicted and actual savings. ESCOs typically invested about$2.30/ft(sup 2) per project in various energy efficiency improvements, although there is large variation in project costs within and across market segments. We find that lighting-only projects report median electricity savings of 47% of targeted equipment consumption; the median for lighting- and -non-lighting projects is 23% of the total electric bill baseline. We examine project economics, including project net benefits, benefit/cost ratio and simple payback time. Median simple payback time is seven years for institutional sector projects and three years in the private sector. We estimate direct economic benefits of$1.62 billion for the 1080 projects in our database with both cost and savings data. The median benefit/cost ratio is 2.1 for 309 private sector projects and 1.6 for 771 institutional sector projects. We discuss the role of policies and programs adopted by state/federal legislatures and agencies that have played an important role in stimulating ESCO activity

  7. A Principal Component Analysis of Project Management Construction Industry Competencies for the Ghanaian

    Directory of Open Access Journals (Sweden)

    Rockson Dobgegah

    2011-03-01

    Full Text Available The study adopts a data reduction technique to examine the presence of any complex structure among a set of project management competency variables. A structured survey questionnaire was administered to 100 project managers to elicit relevant data, and this achieved a relatively high response rate of 54%. After satisfying all the necessary tests of reliability of the survey instrument, sample size adequacy and population matrix, the data was subjected to principal component analysis, resulting in the identification of six new thematic project management competency areas ; and were explained in terms of human resource management and project control; construction innovation and communication; project financial resources management; project risk and quality management; business ethics and; physical resources and procurement management. These knowledge areas now form the basis for lateral project management training requirements in the context of the Ghanaian construction industry. Key contribution of the paper is manifested in the use of the principal component analysis, which has rigorously provided understanding into the complex structure and the relationship between the various knowledge areas. The originality and value of the paper is embedded in the use of contextual-task conceptual knowledge to expound the six uncorrelated empirical utility of the project management competencies.

  8. Constructing Multidatabase Collections Using Extended ODMG Object Model

    Directory of Open Access Journals (Sweden)

    Adrian Skehill Mark Roantree

    1999-11-01

    Full Text Available Collections are an important feature in database systems. They provide us with the ability to group objects of interest together, and then to manipulate them in the required fashion. The OASIS project is focused on the construction a multidatabase prototype which uses the ODMG model and a canonical model. As part of this work we have extended the base model to provide a more powerful collection mechanism, and to permit the construction of a federated collection, a collection of heterogenous objects taken from distributed data sources

  9. Sex Difference in Bottlenose Dolphin Sightings during a Long-term Bridge Construction Project

    Directory of Open Access Journals (Sweden)

    Ann Weaver

    2015-02-01

    Full Text Available Almost nothing is known about the effect of long-term bridge construction on free-ranging bottlenose dolphins (Tursiops truncatus. The species’ natural history predicts that there should be sex differences in reaction to construction because bottlenose dolphins show sex differences in most of their behaviors. A 5-year bridge construction project over a narrow but important dolphin corridor at John’s Pass tidal inlet, St. Petersburg FL, brought chronic environmental changes. The purpose of this 8-year study was to determine if bridge construction was associated with changes in dolphin sightings. The sex difference hypothesis was tested with a comparison of sighting probabilities before, during and after bridge construction. Sighting probabilities were generated for 68 adults seen n = 6504 times during N = 951 small-boat surveys of the 6.5-mile estuarine study area, documented with photo identification June 2005-December 2012. The sex difference hypothesis was supported with a significant interaction between construction and gender. Female sightings showed a significant linear decline across construction. Male sightings did not change across construction. The main conclusion is that adult males and females may react differently to habitat changes associated with anthropogenic activities. Sex differences in environmental monitoring and vigilance associated with maternal behavior may have played a role. This is the first report on John’s Pass dolphins that evaluates changes in their behavior during a major construction project across a narrow but important dolphin corridor.

  10. 42 CFR 137.338 - Must funds from other sources be incorporated into a construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... SELF-GOVERNANCE Construction Project Assumption Process § 137.338 Must funds from other sources be... 42 Public Health 1 2010-10-01 2010-10-01 false Must funds from other sources be incorporated into a construction project agreement? 137.338 Section 137.338 Public Health PUBLIC HEALTH SERVICE...

  11. Management for Construction Materials and Control of Construction Waste in Construction Industry: A Review

    OpenAIRE

    A. A. Gulghane; Prof P. V. Khandve

    2015-01-01

    In recent treads a wide range of building materials is available for the construction of civil engineering structures. The total cost of materials may be up to 60% or more of the total cost incurred in construction project dependent upon the type of project. Effective construction materials management is a key to success for a construction project. Construction waste is another serious problem in construction industry. A large and various types of construction waste with different...

  12. REVIEW OF INTERNATIONAL PROJECTS IN А FIELD OF HUMAN MICROBIAL ECOLOGY AND CONSTRUCTION OF PROBIOTICS

    Directory of Open Access Journals (Sweden)

    S. A. Starovoitova

    2013-06-01

    Full Text Available Modern huge and world-wide known projects concerning studying of human microbial ecology and construction of probiotics, particularly: Society for Microbial Ecology and Disease, Probiotics & Health Targeted Initiative of International Science and Technology Center (TI PROBIO ISTC, Human Microbiome Project of National Institutes of Health, MetaHIT Project (Metagenomics of the Human Intestinal Tract of European Commission, Human Metabolome Project of Canadian University of Alberta and some more else were characterized in the article. Brief historical information and reference to official sites of every discussed project were given. Main goals and tasks of every project were described. Short characteristic of discussed projects and also modern accessible results of researches were given. Importance of every examined project for widening scientific knowledge in the field of human microbial ecology and also for improvement and/or for construction of modern effective probiotics on basis of human normal intestinal microflora were paid attention. Close interaction of scientific data received by realization of every discussed project was shown.

  13. Coupling computer-interpretable guidelines with a drug-database through a web-based system – The PRESGUID project

    Directory of Open Access Journals (Sweden)

    Fieschi Marius

    2004-03-01

    Full Text Available Abstract Background Clinical Practice Guidelines (CPGs available today are not extensively used due to lack of proper integration into clinical settings, knowledge-related information resources, and lack of decision support at the point of care in a particular clinical context. Objective The PRESGUID project (PREScription and GUIDelines aims to improve the assistance provided by guidelines. The project proposes an online service enabling physicians to consult computerized CPGs linked to drug databases for easier integration into the healthcare process. Methods Computable CPGs are structured as decision trees and coded in XML format. Recommendations related to drug classes are tagged with ATC codes. We use a mapping module to enhance computerized guidelines coupling with a drug database, which contains detailed information about each usable specific medication. In this way, therapeutic recommendations are backed up with current and up-to-date information from the database. Results Two authoritative CPGs, originally diffused as static textual documents, have been implemented to validate the computerization process and to illustrate the usefulness of the resulting automated CPGs and their coupling with a drug database. We discuss the advantages of this approach for practitioners and the implications for both guideline developers and drug database providers. Other CPGs will be implemented and evaluated in real conditions by clinicians working in different health institutions.

  14. Maturity of project management in construction companies with the use of fuzzy numbers

    Science.gov (United States)

    Klaus-Rosińska, Agata; Kuchta, Dorota

    2017-07-01

    The main aim of the article is to describe issue of maturity in project management regarding construction companies. Taking into consideration this problem the literature research was made, existing project management maturity models were analyzed, model of maturity in project management (using fuzzy numbers approach) was described and tested. The results of testing stage are shown in the case study.

  15. Database Description - eSOL | LSDB Archive [Life Science Database Archive metadata

    Lifescience Database Archive (English)

    Full Text Available base Description General information of database Database name eSOL Alternative nam...eator Affiliation: The Research and Development of Biological Databases Project, National Institute of Genet...nology 4259 Nagatsuta-cho, Midori-ku, Yokohama, Kanagawa 226-8501 Japan Email: Tel.: +81-45-924-5785 Database... classification Protein sequence databases - Protein properties Organism Taxonomy Name: Escherichia coli Taxonomy ID: 562 Database...i U S A. 2009 Mar 17;106(11):4201-6. External Links: Original website information Database maintenance site

  16. How Do Contractors Select Suppliers for Greener Construction Projects? The Case of Three Swedish Companies

    Directory of Open Access Journals (Sweden)

    Shahin Mokhlesian

    2014-06-01

    Full Text Available There are many studies of contractor selection based on clients and the selection of suppliers by contractors. However, supplier selection specifically related to green construction projects has been much less studied. Green construction differs from conventional construction because of differences in its underlying principles and use of environmentally-friendly materials and technologies. This paper studies how procurers in contractor companies in Sweden adopt green projects and how contractor perception of supplier mastery of green knowledge affects supplier selection. The investigation is based on a set of semi-structured interviews conducted among three large contractors in Sweden. A main finding is that the perceived differences between green and conventional projects do not change supplier selection dramatically. An implication is that “greener projects” is a more appropriate denotation than “green project”. Evidence shows that suppliers’ green knowledge is an important factor in supplier selection, as respondents rated suppliers’ knowledge of green projects as very important, and to fix his, there was a consensus among respondents about the need for close collaboration between contractors and suppliers. To ensure knowledge acquisition from suppliers and to increase their competitive advantage over rivals, contractors collaborate with their suppliers in a partnering setting. It is anticipated that the results of this study will be used to fill the gap in the literature on supplier selection in green projects and can also be used for construction firms contemplating getting involved in green projects.

  17. Application of 3D CADDS model to design and engineering for constructability improvement

    International Nuclear Information System (INIS)

    Cho, U.Y.; Park, C.C.; Choy, E.

    1998-01-01

    The use of three dimensional (3D) computer-aided design and drafting system (CADDS) model along with the associated information management system in engineering phases of large projects is well established and yielding significant improvements in project cost, schedule and quality. The information contained in these models can also be utilized in plant construction site for construction schedule review, installation procedure review, interference check, and visual communication tool to the utility owner when the visual and spatial information contained in the 3D models is integrated with other plant information. This paper will describe the application of 3D models and the associated databases in the construction process of CANDU HWR heavy water reactors. Some examples on the use of 3D CADD models in CANDU projects will be presented

  18. An internet enabled impact limiter material database

    Energy Technology Data Exchange (ETDEWEB)

    Wix, S.; Kanipe, F.; McMurtry, W. [Sandia National Labs., Albuquerque, NM (United States)

    1998-07-01

    This paper presents a detailed explanation of the construction of an internet enabled database, also known as a database driven web site. The data contained in the internet enabled database are impact limiter material and seal properties. The techniques used in constructing the internet enabled database presented in this paper are applicable when information that is changing in content needs to be disseminated to a wide audience. (authors)

  19. An internet enabled impact limiter material database

    International Nuclear Information System (INIS)

    Wix, S.; Kanipe, F.; McMurtry, W.

    1998-01-01

    This paper presents a detailed explanation of the construction of an internet enabled database, also known as a database driven web site. The data contained in the internet enabled database are impact limiter material and seal properties. The techniques used in constructing the internet enabled database presented in this paper are applicable when information that is changing in content needs to be disseminated to a wide audience. (authors)

  20. Causal Factors of Corruption in Construction Project Management: An Overview.

    Science.gov (United States)

    Owusu, Emmanuel Kingsford; Chan, Albert P C; Shan, Ming

    2017-11-11

    The development of efficient and strategic anti-corruption measures can be better achieved if a deeper understanding and identification of the causes of corruption are established. Over the past years, many studies have been devoted to the research of corruption in construction management (CM). This has resulted in a significant increase in the body of knowledge on the subject matter, including the causative factors triggering these corrupt practices. However, an apropos systematic assessment of both past and current studies on the subject matter which is needful for the future endeavor is lacking. Moreover, there is an absence of unified view of the causative factors of corruption identified in construction project management (CPM). This paper, therefore, presents a comprehensive review of the causes of corruption from selected articles in recognized construction management journals to address the mentioned gaps. A total number of 44 causes of corruption were identified from 37 publications and analyzed in terms of existing causal factors of corruption, annual trend of publications and the thematic categorization of the identified variables. The most identifiable causes were over close relationships, poor professional ethical standards, negative industrial and working conditions, negative role models and inadequate sanctions. A conceptual framework of causes of corruption was established, after categorizing the 44 variables into five unique categories. In descending order, the five constructs are Psychosocial-Specific Causes, Organizational-Specific Causes, Regulatory-Specific Causes, Project-Specific Causes and Statutory-Specific Causes. This study extends the current literature of corruption research in construction management and contributes to a deepened understanding of the causal instigators of corruption identified in CPM. The findings from this study provide valuable information and extended knowledge to industry practitioners and policymakers as well as

  1. Construction of image database for newspapaer articles using CTS

    Science.gov (United States)

    Kamio, Tatsuo

    Nihon Keizai Shimbun, Inc. developed a system of making articles' image database automatically by use of CTS (Computer Typesetting System). Besides the articles and the headlines inputted in CTS, it reproduces the image of elements of such as photography and graphs by article in accordance with information of position on the paper. So to speak, computer itself clips the articles out of the newspaper. Image database is accumulated in magnetic file and optical file and is output to the facsimile of users. With diffusion of CTS, newspaper companies which start to have structure of articles database are increased rapidly, the said system is the first attempt to make database automatically. This paper describes the device of CTS which supports this system and outline.

  2. Effect of Pre-Construction on Construction Schedule and Client Loyalty

    OpenAIRE

    Jong Hoon Kim; Hyun-Soo Lee; Moonseo Park; Min Jeong; Inbeom Lee

    2016-01-01

    Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client sat...

  3. Information flow in the DAMA project beyond database managers: information flow managers

    Science.gov (United States)

    Russell, Lucian; Wolfson, Ouri; Yu, Clement

    1996-12-01

    To meet the demands of commercial data traffic on the information highway, a new look at managing data is necessary. One projected activity, sharing of point of sale information, is being considered in the Demand Activated Manufacturing Project (DAMA) of the American Textile Partnership (AMTEX) project. A scenario is examined in which 100 000 retail outlets communicate over a period of days. They provide the latest estimate of demand for sewn products across a chain of 26 000 suppliers through the use of bill of materials explosions at four levels of detail. Enabling this communication requires an approach that shares common features with both workflows and database management. A new paradigm, the information flow manager, is developed to handle this situation, including the case where members of the supply chain fail to communicate and go out of business. Techniques for approximation are introduced so as to keep estimates of demand as current as possible.

  4. Projects Delay Factors of Saudi Arabia Construction Industry Using PLS-SEM Path Modelling Approach

    Directory of Open Access Journals (Sweden)

    Abdul Rahman Ismail

    2016-01-01

    Full Text Available This paper presents the development of PLS-SEM Path Model of delay factors of Saudi Arabia construction industry focussing on Mecca City. The model was developed and assessed using SmartPLS v3.0 software and it consists of 37 factors/manifests in 7 groups/independent variables and one dependent variable which is delay of the construction projects. The model was rigorously assessed at measurement and structural components and the outcomes found that the model has achieved the required threshold values. At structural level of the model, among the seven groups, the client and consultant group has the highest impact on construction delay with path coefficient β-value of 0.452 and the project management and contract administration group is having the least impact to the construction delay with β-value of 0.016. The overall model has moderate explaining power ability with R2 value of 0.197 for Saudi Arabia construction industry representation. This model will able to assist practitioners in Mecca city to pay more attention in risk analysis for potential construction delay.

  5. Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community

    Energy Technology Data Exchange (ETDEWEB)

    Kerrigan, P.

    2012-09-01

    BSC has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.

  6. Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community

    Energy Technology Data Exchange (ETDEWEB)

    Kerrigan, Philip [Building Science Corporation, Somerville, MA (United States)

    2012-09-01

    Building Science Corporation has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI, which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.

  7. A Large Scale Problem Based Learning inter-European Student Satellite Construction Project

    DEFF Research Database (Denmark)

    Nielsen, Jens Frederik Dalsgaard; Alminde, Lars; Bisgaard, Morten

    2006-01-01

    that electronic communication technology was vital within the project. Additionally the SSETI EXPRESS project implied the following problems it didn’t fit to a standard semester - 18 months for the satellite project compared to 5/6 months for a “normal” semester project. difficulties in integrating the tasks......A LARGE SCALE PROBLEM BASED LEARNING INTER-EUROPEAN STUDENT SATELLITE CONSTRUCTION PROJECT This paper describes the pedagogical outcome of a large scale PBL experiment. ESA (European Space Agency) Education Office launched January 2004 an ambitious project: Let students from all over Europe build....... The satellite was successfully launched on October 27th 2005 (http://www.express.space.aau.dk). The project was a student driven project with student project responsibility adding at lot of international experiences and project management skills to the outcome of more traditional one semester, single group...

  8. An Intelligent Assistant for Construction of Terrain Databases

    OpenAIRE

    Rowe, Neil C.; Reed, Chris; Jackson, Leroy; Baer, Wolfgang

    1998-01-01

    1998 Command and Control Research and Technology Symposium, Monterey CA, June 1998, 481-486. We describe TELLUSPLAN, an intelligent assistant for the problem of bargaining between user goals and system resources in the integration of terrain databases from separate source databases. TELLUSPLAN uses nondeterministic methods from artificial intelligence and a detailed cost model to infer the most reasonable compromise with the user's needs. Supported by the Army Artificial Int...

  9. Construction Claim Types and Causes for a Large-Scale Hydropower Project in Bhutan

    Directory of Open Access Journals (Sweden)

    Bonaventura H.W. Hadikusumo

    2015-01-01

    Full Text Available Hydropower construction projects are complex and uncertain, have long gestational periods and involve several parties. Furthermore, they require the integration of different components (Civil, Mechanical and Electrical to work together as a single unit. These projects require highly specialised designs, detailed plans and specifications, high-risk construction methods, effective management, skilful supervision and close coordination. Thus, claims are common in such projects. These claims are undesirable because they require significant time and resources to resolve and cause adversarial relationships among the parties involved. Therefore, it is in the common interest of all involved parties to prevent, minimise, or resolve claims as amicably as possible. Identifying common claim types and their causes is essential in devising techniques to minimise and avoid them in future projects. This report details a case study performed on a large-scale hydropower project in Bhutan. The findings of this case study indicate that differing site conditions are the major contributor of impact and change claims and 95% of total claims can be settled by negotiation, whereas 5% of claims can be settled by arbitration.

  10. What is a Lexicographical Database? | Bergenholtz | Lexikos

    African Journals Online (AJOL)

    Fifty years ago, nolexicographer used a database in the work process. Today, almost all dictionary projects incorporate databases. In our opinion, the optimal lexicographical database should be planned in cooperation between a lexicographer and a database specialist in each specific lexicographical project.

  11. A team leadership approach to managing the transition from construction to operations for an environmental project

    International Nuclear Information System (INIS)

    Kelly, J.W.

    1994-06-01

    This presentation describes a team approach, at the totalproject level that focused team members with common objectives, for the transition to start-up and operation of the project. The Integrated Management Team (IMT) approach has been successful for this US Department of Energy (DOE) environmental restoration project at the Hanford Site in Richland, Washington. The $53.8-million project will collect, treat, and dispose of low-level mixed waste water discharges from the Hanford Site. Construction is scheduled for completion in September 1994 and facility start-up in June 1995. The project challenge is for leadership that is committed to the transition from construction to operation of the environmental restoration project

  12. Gene composer: database software for protein construct design, codon engineering, and gene synthesis.

    Science.gov (United States)

    Lorimer, Don; Raymond, Amy; Walchli, John; Mixon, Mark; Barrow, Adrienne; Wallace, Ellen; Grice, Rena; Burgin, Alex; Stewart, Lance

    2009-04-21

    To improve efficiency in high throughput protein structure determination, we have developed a database software package, Gene Composer, which facilitates the information-rich design of protein constructs and their codon engineered synthetic gene sequences. With its modular workflow design and numerous graphical user interfaces, Gene Composer enables researchers to perform all common bio-informatics steps used in modern structure guided protein engineering and synthetic gene engineering. An interactive Alignment Viewer allows the researcher to simultaneously visualize sequence conservation in the context of known protein secondary structure, ligand contacts, water contacts, crystal contacts, B-factors, solvent accessible area, residue property type and several other useful property views. The Construct Design Module enables the facile design of novel protein constructs with altered N- and C-termini, internal insertions or deletions, point mutations, and desired affinity tags. The modifications can be combined and permuted into multiple protein constructs, and then virtually cloned in silico into defined expression vectors. The Gene Design Module uses a protein-to-gene algorithm that automates the back-translation of a protein amino acid sequence into a codon engineered nucleic acid gene sequence according to a selected codon usage table with minimal codon usage threshold, defined G:C% content, and desired sequence features achieved through synonymous codon selection that is optimized for the intended expression system. The gene-to-oligo algorithm of the Gene Design Module plans out all of the required overlapping oligonucleotides and mutagenic primers needed to synthesize the desired gene constructs by PCR, and for physically cloning them into selected vectors by the most popular subcloning strategies. We present a complete description of Gene Composer functionality, and an efficient PCR-based synthetic gene assembly procedure with mis-match specific endonuclease

  13. Gene Composer: database software for protein construct design, codon engineering, and gene synthesis

    Directory of Open Access Journals (Sweden)

    Mixon Mark

    2009-04-01

    Full Text Available Abstract Background To improve efficiency in high throughput protein structure determination, we have developed a database software package, Gene Composer, which facilitates the information-rich design of protein constructs and their codon engineered synthetic gene sequences. With its modular workflow design and numerous graphical user interfaces, Gene Composer enables researchers to perform all common bio-informatics steps used in modern structure guided protein engineering and synthetic gene engineering. Results An interactive Alignment Viewer allows the researcher to simultaneously visualize sequence conservation in the context of known protein secondary structure, ligand contacts, water contacts, crystal contacts, B-factors, solvent accessible area, residue property type and several other useful property views. The Construct Design Module enables the facile design of novel protein constructs with altered N- and C-termini, internal insertions or deletions, point mutations, and desired affinity tags. The modifications can be combined and permuted into multiple protein constructs, and then virtually cloned in silico into defined expression vectors. The Gene Design Module uses a protein-to-gene algorithm that automates the back-translation of a protein amino acid sequence into a codon engineered nucleic acid gene sequence according to a selected codon usage table with minimal codon usage threshold, defined G:C% content, and desired sequence features achieved through synonymous codon selection that is optimized for the intended expression system. The gene-to-oligo algorithm of the Gene Design Module plans out all of the required overlapping oligonucleotides and mutagenic primers needed to synthesize the desired gene constructs by PCR, and for physically cloning them into selected vectors by the most popular subcloning strategies. Conclusion We present a complete description of Gene Composer functionality, and an efficient PCR-based synthetic gene

  14. DESIGN AND CONSTRUCTION OF A FOREST SPATIAL DATABASE: AN APPLICATION

    Directory of Open Access Journals (Sweden)

    Turan Sönmez

    2006-11-01

    Full Text Available General Directorate of Forests (GDF has not yet created the spatial forest database to manage forest and catch the developed countries in forestry. The lack of spatial forest database results in collection of the spatial data redundancy, communication problems among the forestry organizations. Also it causes Turkish forestry to be backward of informatics’ era. To solve these problems; GDF should establish spatial forest database supported Geographic Information System (GIS. To design the spatial database, supported GIS, which provides accurate, on time and current data/info for decision makers and operators in forestry, and to develop sample interface program to apply and monitor classical forest management plans is paramount in contemporary forest management planning process. This research is composed of three major stages: (i spatial rototype database design considering required by the three hierarchical organizations of GDF (regional directorate of forests, forest enterprise, and territorial division, (ii user interface program developed to apply and monitor classical management plans based on the designed database, (iii the implementation of the designed database and its user interface in Artvin Central Planning Unit.

  15. Fire test database

    International Nuclear Information System (INIS)

    Lee, J.A.

    1989-01-01

    This paper describes a project recently completed for EPRI by Impell. The purpose of the project was to develop a reference database of fire tests performed on non-typical fire rated assemblies. The database is designed for use by utility fire protection engineers to locate test reports for power plant fire rated assemblies. As utilities prepare to respond to Information Notice 88-04, the database will identify utilities, vendors or manufacturers who have specific fire test data. The database contains fire test report summaries for 729 tested configurations. For each summary, a contact is identified from whom a copy of the complete fire test report can be obtained. Five types of configurations are included: doors, dampers, seals, wraps and walls. The database is computerized. One version for IBM; one for Mac. Each database is accessed through user-friendly software which allows adding, deleting, browsing, etc. through the database. There are five major database files. One each for the five types of tested configurations. The contents of each provides significant information regarding the test method and the physical attributes of the tested configuration. 3 figs

  16. Medial Temporal Lobe Contributions to Episodic Future Thinking: Scene Construction or Future Projection?

    Science.gov (United States)

    Palombo, D J; Hayes, S M; Peterson, K M; Keane, M M; Verfaellie, M

    2018-02-01

    Previous research has shown that the medial temporal lobes (MTL) are more strongly engaged when individuals think about the future than about the present, leading to the suggestion that future projection drives MTL engagement. However, future thinking tasks often involve scene processing, leaving open the alternative possibility that scene-construction demands, rather than future projection, are responsible for the MTL differences observed in prior work. This study explores this alternative account. Using functional magnetic resonance imaging, we directly contrasted MTL activity in 1) high scene-construction and low scene-construction imagination conditions matched in future thinking demands and 2) future-oriented and present-oriented imagination conditions matched in scene-construction demands. Consistent with the alternative account, the MTL was more active for the high versus low scene-construction condition. By contrast, MTL differences were not observed when comparing the future versus present conditions. Moreover, the magnitude of MTL activation was associated with the extent to which participants imagined a scene but was not associated with the extent to which participants thought about the future. These findings help disambiguate which component processes of imagination specifically involve the MTL. Published by Oxford University Press 2016.

  17. The web-enabled ODIN portal - useful databases for the European Nuclear Society

    International Nuclear Information System (INIS)

    Over, H.H.; Wolfart, E.

    2005-01-01

    Materials databases (MDBs) are powerful tools to store, retrieve and present experimental materials data of various categories adapted to specific needs of users. In combination with analysis tools experimental data are necessary for e.g. mechanical design, construction and lifetime predictions of complex components. The effective and efficient handling of large amounts of generic and detailed materials properties data related to e.g. fabrication processes is one of the basic elements of data administration within ongoing European research projects and networks. Over the last 20 years, the JRC/Institute of Energy of the European Commission at Petten has developed and continuously improved a database for experimental materials properties data (Mat-DB). The Mat-DB database structure is oriented to international material standards and recommendations. The database and associated analysis routines are accessible through a web-enabled interface on the On-line Data Information Network (ODIN: http://odin.jrc.nl). ODIN provides controlled access to Mat-DB and other related databases (e.g. the document database DoMa) and thus allows European R and D projects to securely manage and disseminate their experimental test data as well as any type of supporting documentation (e.g. unfiltered raw data, reports, minutes, etc). Using the Internet project partners can instantly access and evaluate data sets entered and validated by one of the members. This paper describes the structure and functionality of Mat-DB and gives examples how these tools can be used for the benefit of European nuclear R and D community. (author)

  18. Construction management

    CERN Document Server

    Pellicer, Eugenio; Teixeira, José C; Moura, Helder P; Catalá, Joaquín

    2014-01-01

    The management of construction projects is a wide ranging and challenging discipline in an increasingly international industry, facing continual challenges and demands for improvements in safety, in quality and cost control, and in the avoidance of contractual disputes. Construction Management grew out of a Leonardo da Vinci project to develop a series of Common Learning Outcomes for European Managers in Construction. Financed by the European Union, the project aimed to develop a library of basic materials for developing construction management skills for use in a pan-European context. Focused exclusively on the management of the construction phase of a building project from the contractor's point of view, Construction Management covers the complete range of topics of which mastery is required by the construction management professional for the effective delivery of new construction projects. With the continued internationalisation of the construction industry, Construction Management will be required rea...

  19. The quality control for biological-shield heavy concrete construction of nuclear power project

    International Nuclear Information System (INIS)

    Sun Hongjun; Ma Xinchao

    2012-01-01

    The paper introduces the function and characteristics of biological protective heavy-concrete, and its main application scope and role in Fangjiashan nuclear power project. From the aspects of raw material selection, mixing ratio test, heavy concrete production, the paper discusses the main control points of heavy concrete construction process, points out the basic characteristics of heavy concrete construction, and put forward measures to prevent density non-uniformity during heavy concrete construction and to control slump during transportation. Results prove that reasonable construction process control can assure the engineering quality. (authors)

  20. A Computer Knowledge Database of accidents at work in the construction industry

    Science.gov (United States)

    Hoła, B.; Szóstak, M.

    2017-10-01

    At least 60,000 fatal accidents at work occur on building sites all over the world each year, which means that on average, every 10 minutes an employee dies during the execution of work. In 2015 on Polish building sites, 5,776 accidents at work happened, of which 69 resulted in the death of an employee. Accidents are an enormous social and economic burden for companies, communities and countries. The vast majority of accidents at work can be prevented by appropriate and effective preventive measures. Therefore, the Computer Knowledge Database (CKD) was formulated for this purpose and it enables data and information on accidents at work in the construction industry to be collected and processed in order to obtain necessary knowledge. This gained knowledge will be the basis to form conclusions of a preventive nature