  1. Enloe Dam Passage Project, Volume I, 1984 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fanning, M.L.

    1985-07-01

    This report discusses issues related to the provision of fish passage facilities at Enloe Dam and the introduction of anadromous salmonid fish to the upper Similkameen River basin. The species of fish being considered is a summer run of steelhead trout adapted to the upper Columbia basin. (ACR)

  2. 75 FR 5626 - Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas County, WA INT-DES...

    Science.gov (United States)

    2010-02-03

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Cle Elum Dam Fish Passage Facilities and Fish... Act (NEPA) on the Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project. The Washington... passage and upstream adult fish passage facilities at the dam, as well as analyses associated with the...

  3. 76 FR 20707 - Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas County, WA

    Science.gov (United States)

    2011-04-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [INT-FES 11-02] Cle Elum Dam Fish Passage.... ACTION: Notice of availability of the Final Environmental Impact Statement (FEIS) for the Cle Elum Dam... (Reclamation) is notifying the public that it has prepared an FEIS on the proposed Cle Elum Dam Fish Passage...

  4. Hydroacoustic Evaluation of Fish Passage through Bonneville Dam in 2004

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Schilt, Carl R.; Kim, Jina; Johnson, Peter N.; Hanks, Michael E.; Patterson, Deborah S.; Skalski, John R.; Hedgepeth, J

    2005-12-22

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2004. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of four studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 15 and July 15, 2004, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, (2) B2 fish guidance efficiency and gap loss, (3) smolt approach and fate at the B2 Corner Collector (B2CC), and (4) B2 vertical barrier screen head differential.

  5. Hydroacoustic Evaluation of Fish Passage Through Bonneville Dam in 2005

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Zimmerman, Shon A.; Hughes, James S.; Bouchard, Kyle E.; Fischer, Eric S.; Schilt, Carl R.; Hanks, Michael E.; Kim, Jina; Skalski, John R.; Hedgepeth, J.; Nagy, William T.

    2006-12-04

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2005. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of two studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 16 and July 15, 2005, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, and (2) smolt approach and fate at B1 Sluiceway Outlet 3C from the B1 forebay. Some of the large appendices are only presented on the compact disk (CD) that accompanies the final report. Examples include six large comma-separated-variable (.CSV) files of hourly fish passage, hourly variances, and Project operations for spring and summer from Appendix E, and large Audio Video Interleave (AVI) files with DIDSON-movie clips of the area upstream of B1 Sluiceway Outlet 3C (Appendix H). Those video clips show smolts approaching the outlet, predators feeding on smolts, and vortices that sometimes entrained approaching smolts into turbines. The CD also includes Adobe Acrobat Portable Document Files (PDF) of the entire report and appendices.

  6. Hydroacoustic Evaluation of Juvenile Salmonid Passage and Distribution at Lookout Point Dam, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Khan, Fenton; Johnson, Gary E.; Royer, Ida M.; Hughes, James S.; Fischer, Eric S.; Trott, Donna M.; Ploskey, Gene R.

    2011-07-01

    This report presents the results of an evaluation of juvenile salmonid passage and distribution at Lookout Point Dam (LOP) on the Middle Fork Willamette River. The study was conducted by the Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers, Portland District (USACE). The goal of the study was to provide fish passage and distribution data to support decisions on long-term measures to enhance downstream passage at LOP and others dams in USACE’s Willamette Valley Project in response to the listing of Upper Willamette River Spring Chinook salmon (Oncorhynchus tshawytscha) and Upper Willamette River steelhead (O. mykiss) as threatened under the Endangered Species Act. During the year-long study period - February 1, 2010 to January 31, 2011the objectives of the hydroacoustic evaluation of fish passage and distribution at LOP were to: 1. Estimate passage rates, run timing, horizontal distribution, and diel distribution at turbine penstock intakes for smolt-size fish. 2. Estimate passage rates, run timing and diel distribution at turbine penstock intakes for small-size fish. 3. Estimate passage rates and run timing at the regulating outlets for smolt-size fish. 4. Estimate vertical distribution of smolt-size fish in the forebay near the upstream face of the dam. The fixed-location hydroacoustic technique was used to accomplish the objectives of this study. Transducers (420 kHz) were deployed in each penstock intake, above each RO entrance, and on the dam face; a total of nine transducers (2 single-beam and 7 split-beam) were used. We summarize the findings from the hydroacoustic evaluation of juvenile salmonid passage and distribution at LOP during February 2010 through January 2011 as follows. • Fish passage rates for smolt-size fish (> ~90 mm) were highest during December-January and lowest in mid-summer through early fall. • During the entire study period, an estimated total of 142,463 fish ± 4,444 (95% confidence interval) smolt

  7. Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.

    2013-05-01

    The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

  8. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at John Day Dam, Spring 2010

    Energy Technology Data Exchange (ETDEWEB)

    Weiland, Mark A.; Ploskey, Gene R.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Skalski, J. R.; Townsend, Richard L.

    2012-11-15

    The purpose of this study was to compare dam passage survival, at two spill treatment levels, of yearling Chinook salmon and steelhead smolts at John Day Dam during spring 2010. The two treatments were 30% and 40% spill out of total project discharge. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 and estimated with a standard error (SE) less than or equal 0.015. The study also estimated forebay residence time, tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. However, by agreement among the stakeholders, this study was not an official BiOp compliance test because the long-term passage measures at John Day Dam have yet to be finalized and another year of spill-treatment testing was desired.

  9. Temporary Restoration of Bull Trout Passage at Albeni Falls Dam

    Energy Technology Data Exchange (ETDEWEB)

    Paluch, Mark; Scholz, Allan; McLellan, Holly [Eastern Washington University Department of Biology; Olson, Jason [Kalispel Tribe of Indians Natural Resources Department

    2009-07-13

    This study was designed to monitor movements of bull trout that were provided passage above Albeni Falls Dam, Pend Oreille River. Electrofishing and angling were used to collect bull trout below the dam. Tissue samples were collected from each bull trout and sent to the U. S. Fish and Wildlife Service Abernathy Fish Technology Center Conservation Genetics Lab, Washington. The DNA extracted from tissue samples were compared to a catalog of bull trout population DNA from the Priest River drainage, Lake Pend Oreille tributaries, and the Clark Fork drainage to determine the most probable tributary of origin. A combined acoustic radio or radio tag was implanted in each fish prior to being transported and released above the dam. Bull trout relocated above the dam were able to volitionally migrate into their natal tributary, drop back downstream, or migrate upstream to the next dam. A combination of stationary radio receiving stations and tracking via aircraft, boat, and vehicle were used to monitor the movement of tagged fish to determine if the spawning tributary it selected matched the tributary assigned from the genetic analysis. Seven bull trout were captured during electrofishing surveys in 2008. Of these seven, four were tagged and relocated above the dam. Two were tagged and left below the dam as part of a study monitoring movements below the dam. One was immature and too small at the time of capture to implant a tracking tag. All four fish released above the dam passed by stationary receivers stations leading into Lake Pend Oreille and no fish dropped back below the dam. One of the radio tags was recovered in the tributary corresponding with the results of the genetic test. Another fish was located in the vicinity of its assigned tributary, which was impassable due to low water discharge at its mouth. Two fish have not been located since entering the lake. Of these fish, one was immature and not expected to enter its natal tributary in the fall of 2008. The other

  10. Compliance Monitoring of Subyearling Chinook Salmon Survival and Passage at The Dalles Dam, Summer 2012

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Johnson, Gary E.

    2013-05-01

    The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at The Dalles Dam during summer 2012. Under the 2008 Federal Columbia River Power System Biological Opinion, dam passage survival is required to be greater than or equal to 0.93 and estimated with a standard error (SE) less than or equal to 0.015. The study also estimated survival from the forebay 2 km upstream of the dam and through the tailrace to 2 km downstream of the dam, forebay residence time, tailrace egress time, spill passage efficiency (SPE), and fish passage efficiency (FPE), as required by the 2008 Columbia Basin Fish Accords.

  11. Hydroacoustic Evaluation of Juvenile Salmonid Passage and Distribution at Detroit Dam, 2011

    Energy Technology Data Exchange (ETDEWEB)

    Khan, Fenton; Royer, Ida M.; Johnson, Gary E.; Ham, Kenneth D.

    2012-11-15

    Pacific Northwest National Laboratory evaluated juvenile salmonid passage and distribution at Detroit Dam (DET) on the North Santiam River, Oregon for the U.S. Army Corps of Engineers (USACE) to provide data to support decisions on long-term measures to enhance downstream passage at DET and others dams in USACE’s Willamette Valley Project. This study was conducted in response to regulatory requirements necessitated by the listing of Upper Willamette River Spring Chinook salmon (Oncorhynchus tshawytscha) and Upper Willamette River steelhead (O. mykiss) as threatened under the Endangered Species Act. The goal of the study was to provide information of juvenile salmonid passage and distribution at DET from February 2011 through February 2012. The results of the hydroacoustic study provide new and, in some cases, first-ever data on passage estimates, run timing, distributions, and relationships between fish passage and environmental variables at the dam. This information will inform management decisions on the design and development of surface passage and collection devices to help restore Chinook salmon populations in the North Santiam River watershed above DET. During the entire study period, an estimated total of 182,526 smolt-size fish (±4,660 fish, 95% CI) passed through turbine penstock intakes. Run timing peaked in winter and early spring months. Passage rates were highest during late fall, winter and early spring months and low during summer. Horizontal distribution for hours when both turbine units were operated simultaneously indicated Unit 2 passed almost twice as much fish as Unit 1. Diel distribution for smolt-size fish during the study period was fairly uniform, indicating fish were passing the turbines at all times of the day. A total of 5,083 smolt-size fish (± 312 fish, 95% CI) were estimated passed via the spillway when it was open between June 23 and September 27, 2011. Daily passage was low at the spillway during the June-August period, and

  12. Hydroacoustic Evaluation of Juvenile Salmonid Passage and Distribution at Lookout Point Dam, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Khan, Fenton; Johnson, Gary E.; Royer, Ida M.; Hughes, James S.; Fischer, Eric S.; Trott, Donna M.; Ploskey, Gene R.

    2012-05-31

    Pacific Northwest National Laboratory evaluated juvenile salmonid passage and distribution at Lookout Point Dam (LOP) on the Middle Fork Willamette River for the U.S. Army Corps of Engineers, Portland District (USACE), to provide data to support decisions on long-term measures to enhance downstream passage at LOP and others dams in USACE's Willamette Valley Project. This study was conducted in response to the listing of Upper Willamette River Spring Chinook salmon (Oncorhynchus tshawytscha) and Upper Willamette River steelhead (O. mykiss) as threatened under the Endangered Species Act. We conducted a hydroacoustic evaluation of juvenile salmonid passage and distribution at LOP during February 2010 through January 2011. Findings from this 1 year of study should be applied carefully because annual variation can be expected due to variability in adult salmon escapement, egg-to-fry and fry-to-smolt survival rates, reservoir rearing and predation, dam operations, and weather. Fish passage rates for smolt-size fish (> {approx}90 mm and < 300 mm) were highest during December-January and lowest in mid-summer through early fall. Passage peaks were also evident in early spring, early summer, and late fall. During the entire study period, an estimated total of 142,463 fish {+-} 4,444 (95% confidence interval) smolt-size fish passed through turbine penstock intakes. Of this total, 84% passed during December-January. Run timing for small-size fish ({approx}65-90 mm) peaked (702 fish) on December 18. Diel periodicity of smolt-size fish showing crepuscular peaks was evident in fish passage into turbine penstock intakes. Relatively few fish passed into the Regulating Outlets (ROs) when they were open in summer (2 fish/d) and winter (8 fish/d). Overall, when the ROs were open, RO efficiency (RO passage divided by total project passage) was 0.004. In linear regression analyses, daily fish passage (turbines and ROs combined) for smolt-size fish was significantly related to

  13. Frankenmuth Dam Fish Passage, Cass River, Saginaw County, Michigan

    Science.gov (United States)

    2012-11-01

    part of a flood management and protection project. A concrete floodwall along the northern bank of the Cass River and riprap scour protection along...It was later converted to a wooden structure, and then to a concrete structure. There has been periodic maintenance and patch work done in past...geotechnical coring at the dam). If needed, the temporary cofferdam would likely be constructed of inert material (e.g., stone with an impermeable

  14. Transport, dam passage, and size selection of adult Atlantic Salmon in the Penobscot River, Maine

    Science.gov (United States)

    Sigourney, Douglas B.; Zydlewski, Joseph D.; Hughes, Edward; Cox, Oliver

    2015-01-01

    Prior to 2012, returning adult Atlantic Salmon Salmo salar had to pass through fishways at three dams in the lower section of the Penobscot River, Maine: Veazie Dam (river kilometer [rkm] 48; removed in 2013), Great Works Dam (rkm 60; removed in 2012), and Milford Dam (rkm 62). To facilitate better passage through the lower river, a fish transport program was implemented in 2010 and 2011. Fish were captured at Veazie Dam and were either transported by truck above Milford Dam (TRKD group) or released into the head pond above Veazie Dam (run-of-the-river [ROR] group). To assess the efficacy of transport, we used PIT telemetry to compare the performance and passage of TRKD and ROR fish based on their (1) success in reaching one of the three dams upstream of Milford Dam, (2) time taken to reach an upstream dam (transit time), and (3) success in passing that upstream dam. In both years, the percentage of fish detected at upstream dams was higher for the TRKD group (82.4% in 2010; 78.6% in 2011) than for the ROR group (41.3% in 2010; 22.4% in 2011). In addition, median transit time was faster for TRKD fish (7 d in 2010; 5 d in 2011) than for ROR fish (23 d in 2010; 25 d in 2011). However, passage success through the upstream dams did not differ between the two release groups. Our analysis also revealed a strong, negative size-selective force on dam passage: larger fish were consistently less likely to successfully pass dams than smaller fish. Finally, environmental conditions also influenced passage success. Our analysis shows that the transport of adult Atlantic Salmon can be an effective means by which to increase migration success in systems where upstream passage is poor.

  15. A multi-year analysis of passage and survival at McNary Dam, 2004-09

    Science.gov (United States)

    Adams, Noah S.; Walker, C.E.; Perry, R.W.

    2011-01-01

    We analyzed 6 years (2004–09) of passage and survival data collected at McNary Dam to determine how dam operations and environmental conditions affect passage and survival of juvenile salmonids. A multinomial logistic regression was used to examine how environmental variables and dam operations relate to passage behavior of juvenile salmonids at McNary Dam. We used the Cormack-Jolly-Seber release-recapture model to determine how the survival of juvenile salmonids passing through McNary Dam relates to environmental variables and dam operations. Total project discharge and the proportion of flow passing the spillway typically had a positive effect on survival for all species and routes. As the proportion of water through the spillway increased, the number of fish passing the spillway increased, as did overall survival. Additionally, survival generally was higher at night. There was no meaningful difference in survival for fish that passed through the north or south portions of the spillway or powerhouse. Similarly, there was no difference in survival for fish released in the north, middle, or south portions of the tailrace. For subyearling Chinook salmon migrating during the summer season, increased temperatures had a drastic effect on passage and survival. As temperature increased, survival of subyearling Chinook salmon decreased through all passage routes and the number of fish that passed through the turbines increased. During years when the temporary spillway weirs (TSWs) were installed, passage through the spillway increased for spring migrants. However, due to the changes made in the location of the TSW between years and the potential effect of other confounding environmental conditions, it is not certain if the increase in spillway passage was due solely to the presence of the TSWs. The TSWs appeared to improve forebay survival during years when they were operated.

  16. Hydroacoustic Evaluation of Juvenile Salmonid Passage at The Dalles Dam Sluiceway, 2005

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Khan, Fenton; Hedgepeth, J; Mueller, Robert P.; Rakowski, Cynthia L.; Richmond, Marshall C.; Serkowski, John A.; Skalski, John R.

    2006-06-01

    The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory to evaluate fish passage at The Dalles Dam powerhouse in 2005. The goal of the study was to provide information on smolt passage that will inform decisions on long-term measures and operations to enhance sluiceway passage and reduce turbine passage to improve smolt survival at the dam. The study addressed one of the main programs dedicated to improving juvenile salmonid survival at The Dalles Dam: Surface Flow Bypass. The study objectives (see below) were met using a combination of hydroacoustic and hydraulic data. The study incorporated fixed-location hydroacoustic methods across the entire powerhouse, with especially intense sampling using multiple split-beam transducers at all sluiceway portals. We did not sample fish passage at the spillway in 2005. In the sluiceway nearfield, we used an acoustic camera to track fish movements. The fish data were interpreted with hydraulic data from a computational fluid dynamics (CFD) model. Fish passage data were collected in the framework of an “experiment” using a randomized block design (3-day treatments; two treatments) to compare two sluiceway operational configurations: Sluice 2+5 and Sluice 2+19 (six gates open for each configuration). Total project outflow was 76% of the 10-year average for spring and 71% of the 10-year average for summer. Based on these findings, we make the following recommendations: 1) The sluice should be operated 24 h/d from April until November. 2) Open six rather than three sluice gates to take advantage of the maximum hydraulic capacity of the sluiceway. 3) Open the three gates above the western-most operating main turbine unit and the three gates at MU 8 where turbine passage rates are relatively high. 4) Operate the turbine units below open sluice gates as a standard fish operations procedure. 5) Develop hydraulic and entrance enhancements to the sluiceway to tap the potential of The

  17. Behavior and dam passage of juvenile Chinook salmon at Cougar Reservoir and Dam, Oregon, March 2011 - February 2012

    Science.gov (United States)

    Beeman, John W.; Hansel, Hal C.; Hansen, Amy C.; Haner, Philip V.; Sprando, Jamie M.; Smith, Collin D.; Evans, Scott D.; Hatton, Tyson W.

    2013-01-01

    The movements and dam passage of juvenile Chinook salmon implanted with acoustic transmitters and passive integrated transponder tags were studied at Cougar Reservoir and Dam, near Springfield, Oregon. The purpose of the study was to provide information to aid with decisions about potential alternatives for improving downstream passage conditions for juvenile salmonids in this flood-control reservoir. In 2011, a total of 411 hatchery fish and 26 wild fish were tagged and released during a 3-month period in the spring, and another 356 hatchery fish and 117 wild fish were released during a 3-month period in the fall. A series of 16 autonomous hydrophones throughout the reservoir and 12 hydrophones in a collective system near the dam outlet were used to determine general movements and dam passage of the fish over the life of the acoustic transmitter, which was expected to be about 3 months. Movements within the reservoir were directional, and it was common for fish to migrate repeatedly from the head of the reservoir downstream to the dam outlet and back to the head of the reservoir. Most fish were detected near the temperature control tower at least once. The median time from release near the head of the reservoir to detection within about 100 meters of the dam outlet at the temperature control tower was between 5.7 and 10.8 days, depending on season and fish origin. Dam passage events occurred over a wider range of dates in the spring and summer than in the fall and winter, but dam passage numbers were greatest during the fall and winter. A total of 10.5 percent (43 of 411) of the hatchery fish and 15.4 percent (4 of 26) of the wild fish released in the spring are assumed to have passed the dam, whereas a total of 25.3 percent (90 of 356) of the hatchery fish and 16.9 percent (30 of 117) of the wild fish released in the fall are assumed to have passed the dam. A small number of fish passed the dam after their transmitters had stopped working and were detected at

  18. Downstream passage and impact of turbine shutdowns on survival of silver American Eels at five hydroelectric dams on the Shenandoah River

    Science.gov (United States)

    Eyler, Sheila; Welsh, Stuart A.; Smith, David R.; Rockey, Mary

    2016-01-01

    Hydroelectric dams impact the downstream migrations of silver American Eels Anguilla rostrata via migratory delays and turbine mortality. A radiotelemetry study of American Eels was conducted to determine the impacts of five run-of-the-river hydroelectric dams located over a 195-km stretch of the Shenandoah River, Virginia–West Virginia, during fall 2007–summer 2010. Overall, 96 radio-tagged individuals (mean TL = 85.4 cm) migrated downstream past at least one dam during the study. Most American Eels passed dams relatively quickly; over half (57.9%) of the dam passage events occurred within 1 h of reaching a dam, and most (81.3%) occurred within 24 h of reaching the dam. Two-thirds of the dam passage events occurred via spill, and the remaining passage events were through turbines. Migratory delays at dams were shorter and American Eels were more likely to pass via spill over the dam during periods of high river discharge than during low river discharge. The extent of delay in migration did not differ between the passage routes (spill versus turbine). Twenty-eight American Eels suffered turbine-related mortality, which occurred at all five dams. Mortality rates for eels passing through turbines ranged from 15.8% to 40.7% at individual dams. Overall project-specific mortality rates (with all passage routes combined) ranged from 3.0% to 14.3%. To protect downstream-migrating American Eels, nighttime turbine shutdowns (1800–0600 hours) were implemented during September 15–December 15. Fifty percent of all downstream passage events in the study occurred during the turbine shutdown period. Implementation of the seasonal turbine shutdown period reduced cumulative mortality from 63.3% to 37.3% for American Eels passing all five dams. Modifying the turbine shutdown period to encompass more dates in the spring and linking the shutdowns to environmental conditions could provide greater protection to downstream-migrating American Eels.

  19. Automatic system for monitoring fish passage at dams

    Science.gov (United States)

    Castignolles, Nathalie; Cattoen, Michel; Larinier, M.

    1994-09-01

    Devices called fishways or fish passes are constructed in rivers to help migratory fish get over obstacles (dams). There counting windows are used to monitor fish passage by video-based counting. Our goal is to design and construct a vision system to automate this process. Images are taken by a video camera fitted with an electronic shutter in a backlit fishway. They are stored on optical disks in real time but are processed in delayed time. Faced with high volumes of data, a compression is necessary and an electronic board has been designed to accomplish it in real time. The coding method used is based on a run description of binarized images. Then, a tracking process is implemented on a micro-computer to count the fish crossing the pass. It includes fish recognition, which is based on a Bayesian classification process. In order to reduce processing times, recognition operations (labelling, parameter extraction) are accomplished on coded images. Classification results are satisfactory and are improved by the temporal redundancy generated by the tracking process. Image processing time permits the user, on average, to process images faster than they have been stored. Thus there is no data accumulation. At the end of the processing it is possible to edit a result file, to choose a fish, view its crossing images and change its species if wrong.

  20. Monitoring of Subyearling Chinook Salmon Survival and Passage at Bonneville Dam, Summer 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

    2012-09-01

    The purpose of this study was to estimate dam passage and route specific survival rates for subyearling Chinook salmon smolts to a primary survival-detection array located 81 km downstream of the dam, evaluate a BGS located in the B2 forebay, and evaluate effects of two spill treatments. The 2010 study also provided estimates of forebay residence time, tailrace egress time, spill passage efficiency (SPE), and spill + B2 Corner Collector (B2CC) efficiency, as required in the Columbia Basin Fish Accords. In addition, the study estimated forebay passage survival and survival of fish traveling from the forebay entrance array, through the dam and downstream through 81 km of tailwater.

  1. Hydroacoustic Evaluation of Juvenile Salmonid Passage at The Dalles Dam in 2004

    International Nuclear Information System (INIS)

    Johnson, Gary E.; Hanks, Michael E.; Khan, Fenton; Cook, Chris B.; Hedgepeth, J.; Mueller, Robert P.; Rakowski, Cynthia L.; Richmond, Marshall C.; Sargeant, Susan L.; Serkowski, John A.; Skalski, John R.

    2005-01-01

    The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory to evaluate juvenile salmon passage at The Dalles Dam in 2004 to inform decisions about long-term measures and operations to enhance sluiceway and spill passage and reduce turbine passage to improve smolt survival at the dam. PNNL used fixed-location hydroacoustic sampling across the entire project, especially at the sluiceway and spillway, using multiple split-beam transducers at selected locations. At the sluiceway nearfield, we used an acoustic camera to track fish. The fish data were interpreted and integrated with hydraulic data from a CFD model and in-field ADCP measurements. Two sluiceway operations were compared: West only (SL 1) vs. West+East (SL 1 + SL 18). Based on our findings, we concluded that The Dalles Dam sluiceway has the potential to be highly efficient and effective at passing juvenile salmonids. This potential could be tapped with hydraulic and entrance enhancements to the sluiceway. We recommended the following: (1) six rather than three sluice gates should be opened to take advantage of the maximum hydraulic capacity of the sluiceway. (2) The turbine units below open sluice gates should be operated as a standard fish operations procedure. (3) In 2005, the Corps and fisheries agencies should consider operating sluice gates in one or more of the following combinations of six gates: (a) SL 1-1, 1-2, 1-3 and SL 18-1, 18-2, 18-3 (repeat 2004 operation), (b) SL 1-1, 1-2, 1-3 and SL 11-1, 11-2, 11-3, or (c) SL 1-1, 1-2, 1-3 and SL 2-1, 2-2, 2-3. The following elements for surface flow bypasses which should be considered during design of any sluiceway enhancements at The Dalles Dam: (1) form an extensive surface flow bypass flow net (surface bypass discharge greater than ∼7% of total project discharge), (2) create a gradual increase in water velocity approaching the surface flow bypass (ideally, acceleration 3 m/s) to entrain the subject juvenile

  2. Hydroacoustic Evaluation of Juvenile Salmonid Passage at The Dalles Dam in 2004

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Hanks, Michael E.; Khan, Fenton; Cook, Chris B.; Hedgepeth, J; Mueller, Robert P.; Rakowski, Cynthia L.; Richmond, Marshall C.; Sargeant, Susan L.; Serkowski, John A.; Skalski, John R.

    2005-06-01

    The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory to evaluate juvenile salmon passage at The Dalles Dam in 2004 to inform decisions about long-term measures and operations to enhance sluiceway and spill passage and reduce turbine passage to improve smolt survival at the dam. PNNL used fixed-location hydroacoustic sampling across the entire project, especially at the sluiceway and spillway, using multiple split-beam transducers at selected locations. At the sluiceway nearfield, we used an acoustic camera to track fish. The fish data were interpreted and integrated with hydraulic data from a CFD model and in-field ADCP measurements. Two sluiceway operations were compared: West only (SL 1) vs. West+East (SL 1 + SL 18). Based on our findings, we concluded that The Dalles Dam sluiceway has the potential to be highly efficient and effective at passing juvenile salmonids. This potential could be tapped with hydraulic and entrance enhancements to the sluiceway. We recommended the following: (1) six rather than three sluice gates should be opened to take advantage of the maximum hydraulic capacity of the sluiceway. (2) The turbine units below open sluice gates should be operated as a standard fish operations procedure. (3) In 2005, the Corps and fisheries agencies should consider operating sluice gates in one or more of the following combinations of six gates: (a) SL 1-1, 1-2, 1-3 and SL 18-1, 18-2, 18-3 (repeat 2004 operation), (b) SL 1-1, 1-2, 1-3 and SL 11-1, 11-2, 11-3, or (c) SL 1-1, 1-2, 1-3 and SL 2-1, 2-2, 2-3. The following elements for surface flow bypasses which should be considered during design of any sluiceway enhancements at The Dalles Dam: (1) form an extensive surface flow bypass flow net (surface bypass discharge greater than {approx}7% of total project discharge), (2) create a gradual increase in water velocity approaching the surface flow bypass (ideally, acceleration < 1 m/s/m), (3) make water

  3. South Channel Dam Rehabilitation Project - Successfully Addressing Dam Rehabilitation Challenges

    OpenAIRE

    Graeser, M. D.; Jensen, M. C.

    2016-01-01

    The Post Falls South Channel Dam is located on the Spokane River in Post Falls, Idaho. The concrete gravity dam was constructed in 1906 and was recently rehabilitated. The rehabilitation project included several design elements; the primary objectives were the replacement of the six spillway gates and hoists and significant rehabilitation of the concrete. The South Channel Dam rehabilitation encountered several challenges due to the age and condition of the existing structure, the large scale...

  4. Dam Removal Provides Fish Passage, Water Quality Benefits

    Science.gov (United States)

    The Bishopville Pond Dam in Maryland has been replaced with a series of pools, runs and step-like structures, improving water quality downstream and providing access for key fish species to spawn upstream.

  5. Sluiceway Operations for Adult Steelhead Downstream Passage at The Dalles Dam, Columbia River, USA

    Energy Technology Data Exchange (ETDEWEB)

    Khan, Fenton; Royer, Ida M.; Johnson, Gary E.; Tackley, Sean C.

    2013-10-01

    This study evaluated adult steelhead (Oncorhynchus mykiss; fallbacks and kelts) downstream passage at The Dalles Dam in the Columbia River, USA, during the late fall, winter, and early spring months between 2008 and 2011. The purpose of the study was to determine the efficacy of operating the dam’s ice-and-trash sluiceway during non-spill months to provide a relatively safe, non-turbine, surface outlet for overwintering steelhead fallbacks and downstream migrating steelhead kelts. We applied the fixed-location hydroacoustic technique to estimate fish passage rates at the sluiceway and turbines of the dam. The spillway was closed during our sampling periods, which generally occurred in late fall, winter, and early spring. The sluiceway was highly used by adult steelhead (91–99% of total fish sampled passing the dam) during all sampling periods. Turbine passage was low when the sluiceway was not operated. This implies that lack of a sluiceway route did not result in increased turbine passage. However, when the sluiceway was open, adult steelhead used it to pass through the dam. The sluiceway may be operated during late fall, winter, and early spring to provide an optimal, non-turbine route for adult steelhead (fallbacks and kelts) downstream passage at The Dalles Dam.

  6. Crotch Lake dam rehabilitation project

    International Nuclear Information System (INIS)

    Brunet, G.; Dobrowolski, E.

    1999-01-01

    Replacement of the existing wood crib dam structure on Crotch Lake on the Mississippi River in eastern Ontario that provided water storage for the power production at High Falls Generating Station, became necessary when it was determined that the dam did not meet Ontario-Hydro's safety standards. This paper describes the project of replacing the existing structure with a PVC coated gabion wall with waterproofing. The entire structure was covered with three layers of wire mesh, laced together, and criss-crossed for superior strength and rigidity. The work was completed in 28 days with no environmental impact . Life expectancy of the new structure is in excess of 40 years. With periodic maintenance of the gabion mat cover, life span could be extended an additional 20 to 40 years. 5 figs

  7. Yakima Basin Fish Passage Project, Phase 2

    International Nuclear Information System (INIS)

    1991-08-01

    Implementation of the Yakima Basin Fish Passage Project -- Phase 2 would significantly improve the production of anadromous fish in the Yakima River system. The project would provide offsite mitigation and help to compensate for lower Columbia River hydroelectric fishery losses. The Phase 2 screens would allow greater numbers of juvenile anadromous fish to survive. As a consequence, there would be higher returns of adult salmon and steelhead to the Yakima River. The proposed action would play an integral part in the overall Yakima River anadromous fish enhancement program (fish passage improvement, habitat enhancement, hatchery production increases, and harvest management). These would be environmental benefits associated with implementation of the Fish Passage and Protective Facilities Phase 2 Project. Based on the evaluation presented in this assessment, there would be no significant adverse environmental impacts if the proposed action was carried forward. No significant adverse environmental effects have been identified from construction and operation of the Yakima Phase 2 fish passage project. Proper design and implementation of the project will ensure no adverse effects will occur. Based on the information in this environmental analysis, BPA's and Reclamation's proposal to construct these facilities does not constitute a major Federal action that could significantly affect the quality of the human environment. 8 refs., 4 figs., 6 tabs

  8. Yakima Basin Fish Passage Project, Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    Implementation of the Yakima Basin Fish Passage Project -- Phase 2 would significantly improve the production of anadromous fish in the Yakima River system. The project would provide offsite mitigation and help to compensate for lower Columbia River hydroelectric fishery losses. The Phase 2 screens would allow greater numbers of juvenile anadromous fish to survive. As a consequence, there would be higher returns of adult salmon and steelhead to the Yakima River. The proposed action would play an integral part in the overall Yakima River anadromous fish enhancement program (fish passage improvement, habitat enhancement, hatchery production increases, and harvest management). These would be environmental benefits associated with implementation of the Fish Passage and Protective Facilities Phase 2 Project. Based on the evaluation presented in this assessment, there would be no significant adverse environmental impacts if the proposed action was carried forward. No significant adverse environmental effects have been identified from construction and operation of the Yakima Phase 2 fish passage project. Proper design and implementation of the project will ensure no adverse effects will occur. Based on the information in this environmental analysis, BPA's and Reclamation's proposal to construct these facilities does not constitute a major Federal action that could significantly affect the quality of the human environment. 8 refs., 4 figs., 6 tabs.

  9. Hydroacoustic Evaluation of Fish Passage Through Bonneville Dam in 2000

    National Research Council Canada - National Science Library

    Ploskey, Gene

    2002-01-01

    .... It was a joint study by the ERDC Environmental Laboratory and Pacific Northwest National Laboratory to evaluate the performance of a Prototype Surface Collector and the fish passage efficiency (FPE...

  10. Monitoring of Juvenile Subyearling Chinook Salmon Survival and Passage at John Day Dam, Summer 2010

    Energy Technology Data Exchange (ETDEWEB)

    Weiland, Mark A.; Ploskey, Gene R.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Skalski, J. R.; Townsend, Richard L.

    2012-11-15

    The purpose of this study was to evaluate dam passage survival of subyearling Chinook salmon (Oncorhynchus tshawytscha; CH0) at John Day Dam (JDA) during summer 2010. This study was conducted by researchers from the Pacific Northwest National Laboratory (PNNL) in collaboration with the Pacific States Marine Fisheries Commission (PSMFC) and the University of Washington (UW). The study was designed to estimate the effects of 30% and 40% spill treatment levels on single release survival rates of CH0 passing through two reaches: (1) the dam, and 40 km of tailwater, (2) the forebay, dam, and 40 km of tailwater. The study also estimated additional passage performance measures which are stipulated in the Columbia Basin Fish Accords.

  11. Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2011

    Energy Technology Data Exchange (ETDEWEB)

    Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.; Hughes, James S.; Hennen, Matthew J.; Kim, Jin A.; Deng, Zhiqun; Fu, Tao; Skalski, J. R.; Townsend, Richard L.; Wagner, Katie A.; Fischer, Eric S.; Duncan, Joanne P.; Batten, G.; Carlson, Thomas J.; Carpenter, Scott M.; Cushing, Aaron W.; Elder, T.; Etherington, D. J.; Johnson, Gary E.; Khan, Fenton; Miracle, Ann L.; Mitchell, T. D.; Prather, K.; Rayamajhi, Bishes; Royer, Ida; Seaburg, Adam; Zimmerman, Shon A.

    2013-06-21

    This report presents survival, behavioral, and fish passage results for tagged yearling Chinook salmon and juvenile steelhead as part of a survival study conducted at John Day Dam during spring 2011. This study was designed to evaluate the passage and survival of yearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a paired-release survival model.

  12. Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.; Hughes, James S.; Kim, Jin A.; Deng, Zhiqun; Fu, Tao; Fischer, Eric S.; Skalski, J. R.; Townsend, Richard L.; Duncan, Joanne P.; Hennen, Matthew J.; Wagner, Katie A.; Arntzen, Evan V.; Miller, Benjamin L.; Miracle, Ann L.; Zimmerman, Shon A.; Royer, Ida M.; Khan, Fenton; Cushing, Aaron W.; Etherington, D. J.; Mitchell, T. D.; Elder, T.; Batton, George; Johnson, Gary E.; Carlson, Thomas J.

    2013-05-01

    This report presents survival, behavioral, and fish passage results for yearling and subyearling Chinook salmon smolts and juvenile steelhead tagged with JSATS acoustic micro-transmitters as part of a survival study conducted at John Day Dam during 2010. This study was designed to evaluate the passage and survival of yearling and subyearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a single-release survival estimate model.

  13. Migratory delay leads to reduced passage success of Atlantic salmon smolts at a hydroelectric dam

    Science.gov (United States)

    Nyqvist, Daniel; Greenberg, L.; Goerig, E.; Calles, O.; Bergman, E.; Ardren, William R.; Castro-Santos, Theodore R.

    2017-01-01

    Passage of fish through hydropower dams is associated with mortality, delay, increased energy expenditure and migratory failure for migrating fish and the need for remedial measures for both upstream and downstream migration is widely recognised. A functional fish passage must ensure safe and timely passage routes that a substantial portion of migrating fish will use. Passage solutions must address not only the number or percentage of fish that successfully pass a barrier, but also the time it takes to pass. Here, we used radiotelemetry to study the functionality of a fish bypass for downstream-migrating wild-caught and hatchery-released Atlantic salmon smolts. We used time-to-event analysis to model the influence of fish characteristics and environmental variables on the rates of a series of events associated with dam passage. Among the modelled events were approach rate to the bypass entry zone, retention rates in both the forebay and the entry zone and passage rates. Despite repeated attempts, only 65% of the tagged fish present in the forebay passed the dam. Fish passed via the bypass (33%), via spill (18%) and via turbines (15%). Discharge was positively related to approach, passage and retention rates. We did not detect any differences between wild and hatchery fish. Even though individual fish visited the forebay and the entry zone on multiple occasions, most fish passed during the first exposures to these zones. This study underscores the importance of timeliness to passage success and the usefulness of time-to-event analysis for understanding factors governing passage performance.

  14. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-03-01

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  15. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, Spring 2011

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Carlson, Thomas J.

    2012-02-01

    The study was designed to estimate dam passage survival at John Day Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  16. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, Spring 2011

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Carlson, Thomas J.

    2012-06-01

    The study was designed to estimate dam passage survival at John Day Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  17. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-06-07

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  18. Evaluation of Behavioral Guidance Structure on Juvenile Salmonid Passage and Survival at Bonneville Dam in 2009

    Energy Technology Data Exchange (ETDEWEB)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; Kim, Jin A.; Fu, Tao; Fischer, Eric S.; Monter, Tyrell J.; Skalski, J. R.

    2011-03-01

    Pacific Northwest National Laboratory (PNNL) conducted an acoustic-telemetry study at Bonneville Dam in 2009 to evaluate the effects of a behavioral guidance structure (BGS) in the Bonneville Dam second powerhouse forebay on fish passage and survival through the second powerhouse (B2), the dam as a whole, and through the first powerhouse and spillway combined. The BGS was deployed to increase the survival of fish passing through B2 by increasing the percentage of outmigrating smolts entering the B2 Corner Collector (B2CC)—a surface flow outlet known to be a relatively benign route for downstream passage at this dam. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. Study results indicated that having turbine 11 in service is important for providing flow conditions that are comparable to those observed in pre-BGS years (2004 and 2005) and in 2008. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  19. A semi-automated method of monitoring dam passage of American Eels Anguilla rostrata

    Science.gov (United States)

    Welsh, Stuart A.; Aldinger, Joni L.

    2014-01-01

    Fish passage facilities at dams have become an important focus of fishery management in riverine systems. Given the personnel and travel costs associated with physical monitoring programs, automated or semi-automated systems are an attractive alternative for monitoring fish passage facilities. We designed and tested a semi-automated system for eel ladder monitoring at Millville Dam on the lower Shenandoah River, West Virginia. A motion-activated eel ladder camera (ELC) photographed each yellow-phase American Eel Anguilla rostrata that passed through the ladder. Digital images (with date and time stamps) of American Eels allowed for total daily counts and measurements of eel TL using photogrammetric methods with digital imaging software. We compared physical counts of American Eels with camera-based counts; TLs obtained with a measuring board were compared with TLs derived from photogrammetric methods. Data from the ELC were consistent with data obtained by physical methods, thus supporting the semi-automated camera system as a viable option for monitoring American Eel passage. Time stamps on digital images allowed for the documentation of eel passage time—data that were not obtainable from physical monitoring efforts. The ELC has application to eel ladder facilities but can also be used to monitor dam passage of other taxa, such as crayfishes, lampreys, and water snakes.

  20. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2011

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Batten, G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Cushing, Aaron W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kim, Jin A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Gary E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Skalski, J. R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Townsend, Richard L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Seaburg, Adam [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Weiland, Mark A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Woodley, Christa M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hughes, James S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carlson, Thomas J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carpenter, Scott M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Deng, Zhiqun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Etherington, D. J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fischer, Eric S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fu, Tao [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Greiner, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hennen, Matthew J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Martinez, Jayson J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mitchell, T. D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rayamajhi, Bishes [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zimmerman, Shon A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-02-15

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2011. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon using a virtual release, paired reference release survival model. This study supports the U.S. Army Corps of Engineers’ continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  1. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, Tyler; Monter, Tyrell J.; Skalski, John R.; Townsend, Richard L.; Zimmerman, Shon A.

    2011-12-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  2. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing Through Bonneville Dam, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, T. D.; Monter, Tyrell J.; Skalski, J. R.; Townsend, Richard L.; Zimmerman, Shon A.

    2012-09-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  3. Passage survival of juvenile steelhead, coho salmon, and Chinook salmon in Lake Scanewa and at Cowlitz Falls Dam, Cowlitz River, Washington, 2010–16

    Science.gov (United States)

    Liedtke, Theresa L.; Kock, Tobias J.; Hurst, William

    2018-04-03

    ) released upstream of Cowlitz Falls Dam moved downstream and passed the project; the remaining fish either remained upstream of the dam (37 percent) or were collected (11 percent). In 2015 and 2016, collection efficiencies at Cowlitz Falls Dam were abnormally high for juvenile steelhead and coho salmon, which resulted in few fish passing the dam. Seven percent of the tagged steelhead (40 fish) and 4 percent of the tagged coho salmon (18 fish) released upstream of the dam eventually passed the project, but these low numbers of fish precluded the estimation of meaningful survival estimates. Dam passage survival probability estimates for juvenile Chinook salmon were 0.828 in 2013 and 0.861 in 2014, lower than previously reported for turbine-specific passage Cowlitz Falls Dam.

  4. Natural Propagation and Habitat Improvement, Washington, Volume IIA, Tumwater Falls and Dryden Dam Fish Passage, 1983 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Unknown Author

    1984-05-01

    This engineering feasibility and predesign report on the Tumwater Falls and Dryden Dam Fish Passage Project provides BPA with information for planning purposes and will serve as a discussion document for interested agencies. Tumwater Falls and Dryden Dams, both on the Wenatchee River, were built in the early 1900's as diversions for hydropower, and irrigation and hydropower, respectively. The present fishway facilities at both sites are inadequate to properly pass the anadromous fish runs in the Wenatchee River. These runs include spring and summer chinook salmon, sockeye salmon, coho salmon and steelhead trout. Predesign level drawings are provided in this report that represent fishway schemes capable of adequately passing present and projected fish runs. The effects of present passage facilities on anadromous fish stocks is addressed both quantitatively and qualitatively. The quantitative treatment assesses losses of adult migrants due to the structures and places an estimated value on those fish. The dollar figure is estimated to be between $391,000 and $701,000 per year for both structures. The qualitative approach to benefits deals with the concept of stock vigor, the need for passage improvements to help ensure the health of the anadromous fish stock. 29 references, 27 figures, 5 tables.

  5. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2012-09-01

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  6. Survival and Passage of Yearling and Subyearling Chinook Salmon and Steelhead at The Dalles Dam, 2010

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Skalski, J. R.; Carlson, Thomas J.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Fischer, Eric S.; Hughes, James S.; Khan, Fenton; Kim, Jin A.; Townsend, Richard L.

    2011-12-01

    The acoustic telemetry study reported here was conducted by researchers at Pacific Northwest National Laboratory (PNNL) and the University of Washington (UW) for the U.S. Army Corps of Engineers, Portland District (USACE). The purpose of the study was to estimate dam passage survival and other performance measures for yearling and subyearling Chinook salmon and steelhead at The Dalles Dam as stipulated by the 2008 Biological Opinion on operation of the Federal Columbia River Power System (FCRPS) and 2008 Columbia Basin Fish Accords.

  7. Passage and survival probabilities of juvenile Chinook salmon at Cougar Dam, Oregon, 2012

    Science.gov (United States)

    Beeman, John W.; Evans, Scott D.; Haner, Philip V.; Hansel, Hal C.; Hansen, Amy C.; Smith, Collin D.; Sprando, Jamie M.

    2014-01-01

    This report describes studies of juvenile-salmon dam passage and apparent survival at Cougar Dam, Oregon, during two operating conditions in 2012. Cougar Dam is a 158-meter tall rock-fill dam used primarily for flood control, and passes water through a temperature control tower to either a powerhouse penstock or to a regulating outlet (RO). The temperature control tower has moveable weir gates to enable water of different elevations and temperatures to be drawn through the dam to control water temperatures downstream. A series of studies of downstream dam passage of juvenile salmonids were begun after the National Oceanic and Atmospheric Administration determined that Cougar Dam was impacting the viability of anadromous fish stocks. The primary objectives of the studies described in this report were to estimate the route-specific fish passage probabilities at the dam and to estimate the survival probabilities of fish passing through the RO. The first set of dam operating conditions, studied in November, consisted of (1) a mean reservoir elevation of 1,589 feet, (2) water entering the temperature control tower through the weir gates, (3) most water routed through the turbines during the day and through the RO during the night, and (4) mean RO gate openings of 1.2 feet during the day and 3.2 feet during the night. The second set of dam operating conditions, studied in December, consisted of (1) a mean reservoir elevation of 1,507 ft, (2) water entering the temperature control tower through the RO bypass, (3) all water passing through the RO, and (4) mean RO gate openings of 7.3 feet during the day and 7.5 feet during the night. The studies were based on juvenile Chinook salmon (Oncorhynchus tshawytscha) surgically implanted with radio transmitters and passive integrated transponder (PIT) tags. Inferences about general dam passage percentage and timing of volitional migrants were based on surface-acclimated fish released in the reservoir. Dam passage and apparent

  8. Survival and Passage of Yearling Chinook Salmon and Steelhead at The Dalles Dam, Spring 2011 - FINAL REPORT

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Gary E.; Hennen, Matthew J.; Zimmerman, Shon A.; Batten, G.; Carpenter, Scott M.; Deng, Zhiqun; Fu, Tao; Hughes, James S.; Martinez, Jayson J.; Ploskey, Gene R.; Royer, Ida M.; Townsend, Richard L.; Woodley, Christa M.; Kim, Jeongkwon; Etherington, D. J.; Skalski, J. R.; Carlson, Thomas J.; Cushing, Aaron W.; Fisher, Erik J.; Greiner, Michael J.; Khan, Fenton; Mitchell, T. D.; Rayamajhi, Bishes; Seaburg, Adam; Weiland, Mark A.

    2012-10-01

    The study reported herein was conducted by the Pacific Northwest National Laboratory (PNNL) and the University of Washington (UW) for the U.S. Army Corps of Engineers, Portland District (USACE). The PNNL and UW project managers were Drs. Thomas J. Carlson and John R. Skalski, respectively. The USACE technical lead was Mr. Brad Eppard. The study was designed to estimate dam passage survival and other performance measures at The Dalles Dam as stipulated by the 2008 Federal Columbia River Power System Biological Opinion (BiOp) and the 2008 Columbia Basin Fish Accords. The study is being documented in two types of reports: compliance and technical. A compliance report is delivered within 6 months of the completion of the field season and focuses on results of the performance metrics outlined in the 2008 BiOp and Fish Accords. A technical report is produced within the 18 months after field work, providing comprehensive documentation of a given study and results on route-specific survival estimates and fish passage distributions, which are not included in compliance reports. This technical report concerns the 2011 acoustic telemetry study at The Dalles Dam.

  9. Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P.; Duke, Bill; Loffink, Ken

    2008-12-30

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.

  10. Dams in the Mekong River Basin: Options for Improved Sediment and Fish Passage

    Science.gov (United States)

    Wild, T. B.; Loucks, D. P.

    2014-12-01

    The Mekong River and its tributaries comprise one of the most productive fish habitats in the world today. The economic value of the Mekong fishery in Lao PDR, Cambodia and Vietnam is among the highest in the world, providing income and food security to tens of millions of people. However, the construction of multiple dams in the basin will reduce sediment discharge, which will adversely impact nutrient transport and habitat quality and availability, and disrupt fish migration routes. Thus, of considerable interest is the identification of alternatives to the location, design and operation of planned hydropower dams that could improve sediment passage, enable migratory fish passage, and sustain fish production for local use. This paper describes the results of simulation studies designed to identify and evaluate such alternatives, as well as their potential impact on hydropower production. Dam sites in Cambodia and Lao PDR on tributaries and on the mainstream Mekong River will be discussed. Evaluations of sediment management techniques such as flushing, sluicing and bypassing will be discussed. This study is intended to inform decision makers in Cambodia, Lao PDR and Vietnam about potential alternatives to current plans as they prepare decisions regarding the development of over 100 hydropower dams throughout the basin.

  11. Survival and Passage of Yearling and Subyearling Chinook Salmon and Juvenile Steelhead at McNary Dam, 2012

    Energy Technology Data Exchange (ETDEWEB)

    Hughes, James S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Weiland, Mark A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Woodley, Christa M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ploskey, Gene R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carpenter, Scott M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hennen, Matthew J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fischer, Eric S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Batton, George [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carlson, Thomas J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Cushing, Aaron W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Deng, Zhiqun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Etherington, D. J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fu, Tao [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Greiner, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ingraham, John M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kim, Jin A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Li, Xi [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Martinez, Jayson J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mitchell, T. D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rayamajhi, Bishes [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Seaburg, Adam [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Skalski, J. R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Townsend, Richard L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wagner, Katie A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zimmerman, Shon A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-12-23

    The study was designed to evaluate the passage and survival of yearling and subyearling Chinook salmon and juvenile steelhead at McNary Dam as stipulated by the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. This study supports the USACE’s continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  12. Hungry Horse Dam fisheries mitigation program: Fish passage and habitat improvement in the Upper Flathead River basin

    International Nuclear Information System (INIS)

    Knotek, W.L.; Deleray, M.; Marotz, B.

    1997-08-01

    In the past 50 years, dramatic changes have occurred in the Flathead Lake and River system. Degradation of fishery resources has been evident, in part due to deterioration of aquatic habitat and introduction of non-endemic fish and invertebrate species. Habitat loss has been attributed to many factors including the construction and operation of Hungry Horse Dam, unsound land use practices, urban development, and other anthropogenic and natural disturbances. Fish migration has also been limited by barriers such as dams and impassible culverts. Cumulatively, these factors have contributed to declines in the distribution and abundance of native fish populations. Recovery of fish populations requires that a watershed approach be developed that incorporates long-term aquatic habitat needs and promotes sound land use practices and cooperation among natural resource management agencies. In this document, the authors (1) describe completed and ongoing habitat improvement and fish passage activities under the Hungry Horse Fisheries Mitigation Program, (2) describe recently identified projects that are in the planning stage, and (3) develop a framework for identifying prioritizing, implementing, and evaluating future fish habitat improvement and passage projects

  13. Evaluation of Steelhead Kelt Passage into the Bonneville Dam Second Powerhouse Corner Collector Prior to the Juvenile Migration Seasons, 2007 and 2008

    Energy Technology Data Exchange (ETDEWEB)

    Weiland, Mark A.; Kim, Jina; Nagy, William T.; Johnson, Gary E.

    2009-09-01

    This report documents the results of a steelhead kelt passage study conducted by the PNNL for the U.S. Army Corps of Engineers at Bonneville Dam in early spring 2007 and 2008. At the Second Powerhouse, a surface flow outlet called the corner collector (B2CC) may be an effective non-turbine passage route for steelhead kelt moving downstream in early spring before the main juvenile emigration season. The goal of this project was to inform management decisions regarding B2CC operations by estimating the number of kelt using the B2CC for downstream passage at Bonneville Dam prior to the juvenile spring migration season. We performed a hydroacoustic study from March 2 to April 10, 2007 and from March 13 to April 15, 2008.

  14. In-reservoir behavior, dam passage, and downstream migration of juvenile Chinook salmon and juvenile steelhead from Detroit Reservoir and Dam to Portland, Oregon, February 2013-February 2014

    Science.gov (United States)

    Beeman, John W.; Adams, Noah S.

    2015-01-01

    In the second year of 2 years of study, the movements of juvenile spring Chinook salmon (Oncorhynchus tshawytscha) and juvenile summer steelhead (Oncorhynchus mykiss) through Detroit Reservoir, passing Detroit Dam, and migrating downstream to Portland, Oregon, were studied during a 1-year-long period beginning in February 2013. The primary purpose of the study was to provide empirical data to inform decisions about future alternatives for improving downstream passage of salmonids at Detroit Dam. A secondary purpose was to design and assess the performance of a system to detect juvenile salmonids implanted with acoustic transmitters migrating in the Willamette River. Inferences about fish migration were made from detections of juvenile fish of hatchery origin at least 95 millimeters in fork length surgically implanted with an acoustic transmitter and released during the spring (March–May) and fall (September–November) of 2013. Detection sites were placed throughout the reservoir, near the dam, and at two sites in the North Santiam River and at three sites in the Willamette River culminating at Portland, Oregon. We based most inferences on an analysis period up to the 90th percentile of tag life (68–78 days after release, depending on species and season), although a small number of fish passed after that period as late as April 8, 2014. Chinook salmon migrated from the tributaries of release to the reservoir in greater proportion than steelhead, particularly in the fall. The in-reservoir migration behaviors and dam passage of the two species were similar during the spring study, but during the fall study, few steelhead reached the reservoir and none passed the dam within the analysis period. Migrations in the reservoir were directed and non-random, except in the forebay. Depths of fish within 25 meters of the dam were deeper in the day than at night for Chinook salmon and similar in the day and night for steelhead; steelhead generally were at shallower depths

  15. Compliance Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at The Dales Dam, Spring 2011

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Johnson, Gary E.; Ploskey, Gene R.; Carlson, Thomas J.

    2012-02-01

    The study estimated dam passage survival at The Dalles Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and provided additional performance measures as stipulated in the Columbia Basin Fish Accords. This summary report focuses on spring run stocks, yearling Chinook salmon and steelhead.

  16. Compliance Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at The Dalles Dam, Spring 2011

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Johnson, Gary E.; Ploskey, Gene R.; Carlson, Thomas J.

    2012-06-12

    The study estimated dam passage survival at The Dalles Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and provided additional performance measures as stipulated in the Columbia Basin Fish Accords. This summary report focuses on spring run stocks, yearling Chinook salmon and steelhead.

  17. Compliance Monitoring of Yearling and Subyearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, 2012

    Energy Technology Data Exchange (ETDEWEB)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Ploskey, Gene R.; Deng, Zhiqun; Carlson, Thomas J.

    2013-05-01

    The purpose of this compliance study was to estimate dam passage survival of yearling and subyearling Chinook salmon and steelhead smolts at John Day Dam during the spring and summer outmigrations in 2012. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 for spring migrants and greater than or equal to 0.93 for summer migrants, estimated with a standard error (SE) less than or equal to 0.015. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 3 km downstream of the dam, as well as the forebay residence time, tailrace egress time, spill passage efficiency (SPE), and fish passage efficiency (FPE), as required in the Columbia Basin Fish Accords (Fish Accords). A virtual/paired-release design was used to estimate dam passage survival at John Day Dam. The approach included releases of smolts, tagged with acoustic micro-transmitters, above John Day Dam that contributed to the formation of a virtual release at the face of John Day Dam. A survival estimate from this release was adjusted by a paired release below John Day Dam. A total of 3376 yearling Chinook salmon, 5726 subyearling Chinook salmon, and 3239 steelhead smolts were used in the virtual releases. Sample sizes for the below-dam paired releases (R2 and R3, respectively) were 997 and 995 for yearling Chinook salmon smolts, 986 and 983 for subyearling Chinook salmon smolts, and 1000 and 1000 for steelhead smolts. The Juvenile Salmon Acoustic Telemetry System (JSATS) tags were manufactured by Advanced Telemetry Systems. Model SS300 tags, weighing 0.304 g in air, were surgically implanted in yearling and subyearling Chinook salmon, and Model SS130 tag, weighing 0.438 g in air, were surgically implanted in juvenile steelhead for this investigation. The intent of the spring study was to estimate dam passage survival during both 30% and 40% spill conditions. The two

  18. Survival estimates for the passage of juvenile chinook salmon through Snake River dams and reservoirs. Annual report 1993

    International Nuclear Information System (INIS)

    Iwamoto, R.N.; Muir, W.D.; Sandford, B.P.; McIntyre, K.W.; Frost, D.A.; Williams, J.G.; Smith, S.G.; Skalski, J.R.

    1994-04-01

    A pilot study was conducted to estimate survival of hatchery-reared yearling chinook salmon through dams and reservoirs on the Snake River. The goals of the study were to: (1) field test and evaluate the Single-Release, Modified-Single-Release, and Paired-Release Models for the estimation of survival probabilities through sections of a river and hydroelectric projects; (2) identify operational and logistical constraints to the execution of these models; and (3) determine the usefulness of the models in providing estimates of survival probabilities. Field testing indicated that the numbers of hatchery-reared yearling chinook salmon needed for accurate survival estimates could be collected at different areas with available gear and methods. For the primary evaluation, seven replicates of 830 to 1,442 hatchery-reared yearling chinook salmon were purse-seined from Lower Granite Reservoir, PIT tagged, and released near Nisqually John boat landing (River Kilometer 726). Secondary releases of PIT-tagged smolts were made at Lower Granite Dam to estimate survival of fish passing through turbines and after detection in the bypass system. Similar secondary releases were made at Little Goose Dam, but with additional releases through the spillway. Based on the success of the 1993 pilot study, the authors believe that the Single-Release and Paired-Release Models will provide accurate estimates of juvenile salmonid passage survival for individual river sections, reservoirs, and hydroelectric projects in the Columbia and Snake Rivers

  19. Survival Estimates for the Passage of Juvenile Chinook Salmon through Snake River Dams and Reservoirs, 1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Iwamoto, Robert N.; Sandford, Benjamin P.; McIntyre, Kenneth W.

    1994-04-01

    A pilot study was conducted to estimate survival of hatchery-reared yearling chinook salmon through dams and reservoirs on the Snake River. The goals of the study were to: (1) field test and evaluate the Single-Release, Modified-Single-Release, and Paired-Release Models for the estimation of survival probabilities through sections of a river and hydroelectric projects; (2) identify operational and logistical constraints to the execution of these models; and (3) determine the usefulness of the models in providing estimates of survival probabilities. Field testing indicated that the numbers of hatchery-reared yearling chinook salmon needed for accurate survival estimates could be collected at different areas with available gear and methods. For the primary evaluation, seven replicates of 830 to 1,442 hatchery-reared yearling chinook salmon were purse-seined from Lower Granite Reservoir, PIT tagged, and released near Nisqually John boat landing (River Kilometer 726). Secondary releases of PIT-tagged smolts were made at Lower Granite Dam to estimate survival of fish passing through turbines and after detection in the bypass system. Similar secondary releases were made at Little Goose Dam, but with additional releases through the spillway. Based on the success of the 1993 pilot study, the authors believe that the Single-Release and Paired-Release Models will provide accurate estimates of juvenile salmonid passage survival for individual river sections, reservoirs, and hydroelectric projects in the Columbia and Snake Rivers.

  20. Official opening of the Olympic Dam project

    International Nuclear Information System (INIS)

    Parbo, A.

    1989-01-01

    This is the text of an address given on November 5, 1988 to mark the commencement of production of copper, uranium, gold and silver from the first stage of the Olympic Dam project at Roxby Downs, South Australia. The huge deposit was discovered in 1975 and years of exploration, underground development, metallurgical testing, planning and establishing the infrastructure followed, at a cost of $750 million. 740 people are now employed at Olympic Dam. The first shipment of copper and uranium oxide left for Sweden at the end of November 1988. The deposit is able to support a much higher production rate as the market for the products, particularly uranium, improves

  1. Synthesis of juvenile lamprey migration and passage research and monitoring at Columbia and Snake River Dams

    Science.gov (United States)

    Mesa, Matthew G.; Weiland, Lisa K.; Christiansen, Helena E.

    2016-01-01

    We compiled and summarized previous sources of data and research results related to the presence, numbers, and migration timing characteristics of juvenile (eyed macropthalmia) and larval (ammocoetes) Pacific lamprey Entosphenus tridentatus, in the Columbia River basin (CRB). Included were data from various screw trap collections, data from historic fyke net studies, catch records of lampreys at JBS facilities, turbine cooling water strainer collections, and information on the occurrence of lampreys in the diets of avian and piscine predators. We identified key data gaps and uncertainties that should be addressed in a juvenile lamprey passage research program. The goal of this work was to summarize information from disparate sources so that managers can use it to prioritize and guide future research and monitoring efforts related to the downstream migration of juvenile Pacific lamprey within the CRB. A common finding in all datasets was the high level of variation observed for CRB lamprey in numbers present, timing and spatial distribution. This will make developing monitoring programs to accurately characterize lamprey migrations and passage more challenging. Primary data gaps centered around our uncertainty on the numbers of juvenile and larval present in the system which affects the ability to assign risk to passage conditions and prioritize management actions. Recommendations include developing standardized monitoring methods, such as at juvenile bypass systems (JBS’s), to better document numbers and timing of lamprey migrations at dams, and use biotelemetry tracking techniques to estimate survival potentials for different migration histories.

  2. Performance of a surface bypass structure to enhance juvenile steelhead passage and survival at Lower Granite Dam, Washington

    Science.gov (United States)

    Adams, Noah S.; Plumb, John M.; Perry, Russell W.; Rondorf, Dennis W.

    2014-01-01

    An integral part of efforts to recover stocks of Pacific salmon Oncorhynchus spp. and steelhead O. mykiss in Pacific Northwest rivers is to increase passage efficacy and survival of juveniles past hydroelectric dams. As part of this effort, we evaluated the efficacy of a prototype surface bypass structure, the removable spillway weir (RSW), installed in a spillbay at Lower Granite Dam, Washington, on the Snake River during 2002, 2003, 2005, and 2006. Radio-tagged juvenile steelhead were released upstream from the dam and their route of passage through the turbines, juvenile bypass, spillway, or RSW was recorded. The RSW was operated in an on-or-off condition and passed 3–13% of the total discharge at the dam when it was on. Poisson rate models were fit to the passage counts of hatchery- and natural-origin juvenile steelhead to predict the probability of fish passing the dam. Main-effect predictor variables were RSW operation, diel period, day of the year, proportion of flow passed by the spillway, and total discharge at the dam. The combined fish passage through the RSW and spillway was 55–85% during the day and 37–61% during the night. The proportion of steelhead passing through nonturbine routes was 95% when the RSW was on during the day. The ratio of the proportion of steelhead passed to the proportion of water passing the RSW was from 6.3:1 to 10.0:1 during the day and from 2.7:1 to 5.2:1 during the night. Steelhead passing through the RSW exited the tailrace about 15 min faster than fish passing through the spillway. Mark–recapture single-release survival estimates for steelhead passing the RSW ranged from 0.95 to 1.00. The RSW appeared to be an effective bypass structure compared with other routes of fish passage at the dam.

  3. Compliance Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at the Dalles Dam, Spring 2010

    Science.gov (United States)

    2010-10-01

    if applicable): Not applicable; this is a compliance study Fish: Implant Procedure: Species-race: yearling Chinook salmon (CH1), steelhead ( STH ...Surgical: Yes Injected: No Source: John Day Dam fish collection facility Size (median): CH1 STH Sample Size: CH1 STH Weight: 31.4 g 78.1 g...conditions and survival for downstream migrants. Survival and Passage Estimates (value & SE): CH1 STH Dam survival 0.9641 (SE = 0.0096) 0.9534

  4. Fish passage mitigation of impacts from hydroelectric power projects in the United States

    International Nuclear Information System (INIS)

    Cada, G.F.

    1996-01-01

    Obstruction of fish movements by dams continues to be the major environmental issue facing the hydropower industry in the US. Dams block upstream migrations, which can cut off adult fish form their historical spawning grounds and severely curtail reproduction. Conversely, downstream-migrating fish may be entrained into the turbine intake flow and suffer turbine-passage injury or mortality. Hydroelectric projects can interfere with the migrations of a wide variety of fish. Maintenance, restoration or enhancement of populations of these species may require the construction of facilities to allow for upstream and downstream fish passage. The Federal Energy Regulatory Commission (FERC), by law, must give fish and wildlife resources equal consideration with power production in its licensing decisions, must be satisfied that a project is consistent with comprehensive plans for a waterway (including fisheries management plans), and must consider all federal and state resource agency terms and conditions for the protection of fish and wildlife. As a consequence, FERC often requires fish passage mitigation measures as a condition of the hydropower license when such measures are deemed necessary for the protection of fish. Much of the recent research and development efforts of the US Department of Energy's Hydropower Program have focused on the mitigation of impacts to upstream and downstream fish passage. This paper descries three components of that effort: (1) a survey of environmental mitigation measures at hydropower sites across the country; (2) a critical review of the effectiveness of fish passage mitigation measures at 16 case study sites; and (3) ongoing efforts to develop new turbine designs that minimize turbine-passage mortality

  5. Fish passage post-construction issues: analysis of distribution, attraction and passage efficiency metrics at the Baguari Dam fish ladder to approach the problem

    Directory of Open Access Journals (Sweden)

    Luiz Gustavo Martins da Silva

    Full Text Available Fish passages are considered the oldest management tool used to minimize the impact of blocking fish migratory routes by hydroelectric power plants. However, fish passages are being installed without specific criteria in Brazil, with severe consequences to the conservation of the local fish fauna. Therefore, basic data gathered for fish passages already constructed could contribute to define operational rules, in addition to offer subsidies to decision-making and design of future facilities. Thus, the fish ladder of Baguari Dam was evaluated regarding temporal distribution, attraction, and ascension of the local fish fauna. A total of 20 fish samples were conducted immediately downstream of the dam and inside the fish ladder, from January 2010 to June 2011. Seasonal variation in fish abundance and richness was registered below the dam and inside the passage, with higher number of migratory fish in the reproductive season (Kruskall-Wallis, p = 0.04 and p = 0.05. Furthermore, higher concentration of migratory allochthonous and non-migratory species was registered for the spill bay (Wilcoxon, p = 0.009 and p = 0.006 compared to the tailrace, where the fish ladder entrance is located. This result suggests low efficiency of the attraction system of the mechanism during the reproductive period. Once entering the fish ladder, migratory species apparently ascend the facility due to the similar distribution throughout different stretches. Generally, the results showed that an operational rule for the Baguari Dam fish ladder should consider running the facility only during the reproductive period, unless the objectives of the passage are well defined. The attraction system must be more precisely evaluated, using technologies such as radiotelemetry. Similarly, fish ascension also should be better analyzed to evaluate the time spent to ascend and its influence in the reproductive biology of the species using the ladder. Pit-tag system could be used to

  6. Characterization of Fish Passage Conditions through a Francis Turbine and Regulating Outlet at Cougar Dam, Oregon, Using Sensor Fish, 2009–2010

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, Joanne P.

    2011-05-23

    Fish passage conditions through a Francis turbine and a regulating outlet (RO) at Cougar Dam on the south fork of the McKenzie River in Oregon were evaluated by Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers, Portland District, using Sensor Fish devices. The objective of the study was to describe and compare passage exposure conditions, identifying potential fish injury regions encountered during passage via specific routes. The RO investigation was performed in December 2009 and the turbine evaluation in January 2010, concurrent with HI-Z balloon-tag studies by Normandeau Associates, Inc. Sensor Fish data were analyzed to estimate 1) exposure conditions, particularly exposure to severe collision, strike, and shear events by passage route sub-regions; 2) differences in passage conditions between passage routes; and 3) relationships to live-fish injury and mortality data estimates. Comparison of the three passage routes evaluated at Cougar Dam indicates that the RO passage route through the 3.7-ft gate opening was relatively the safest route for fish passage under the operating conditions tested; turbine passage was the most deleterious. These observations were supported also by the survival and malady estimates obtained from live-fish testing. Injury rates were highest for turbine passage. Compared to mainstem Columbia River passage routes, none of the Cougar Dam passage routes as tested are safe for juvenile salmonid passage.

  7. The environment of the Olympic Dam project

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The Olympic Dam uranium/copper/gold project at Roxby Downs, South Australia, has a harsh environment with high summer temperatures, low rainfall and poor quality soils. There are no natural water courses. The vegetation is dominated by annual grasses in summer and wildflowers in winter. Red kangaroos are the most commonly sighted native mammals. The Fat-tailed Dunnart a nocturnal carniverous marsupial, is found. Eighty three bird species have been recorded. Reptiles are numerous and one amphibian occurs. A vermin eradication program aimed at rabbit control is conducted. ills

  8. Olympic Dam project: draft environmental impact statement

    International Nuclear Information System (INIS)

    1982-10-01

    The Olympic Dam deposit, South Australia, is estimated to contain at least 2,000 million tonnes of mineralized material, with an average grade of about 1.6% copper, 0.6 Kg/t of uranium oxide and 0.6 g/t of gold. The objective of the project is to extract and process the ore for the production and sale of copper, uranium oxide and the associated gold and silver. Facilities required are an underground mine, an on-site processing plant, associated facilities including a tailings retention system, a town to accommodate up to 9,000 people and other infrastructure. Chapters in the draft E.I.S. contain information on the environment, land use, aboriginal environment, geology, tailings retention system, radiation assessment, project infrastructure, social effects and economic effects

  9. Hungry Horse Dam Fisheries Mitigation : Fish Passage and Habitat Improvement in the Upper Flathead River Basin, 1991-1996 Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Knotek, W.Ladd; Deleray, Mark; Marotz, Brian L.

    1997-08-01

    In the past 50 years, dramatic changes have occurred in the Flathead Lake and River system. Degradation of fishery resources has been evident, in part due to deterioration of aquatic habitat and introduction of non-endemic fish and invertebrate species. Habitat loss has been attributed to many factors including the construction and operation of Hungry Horse Dam, unsound land use practices, urban development, and other anthropogenic and natural disturbances. Fish migration has also been limited by barriers such as dams and impassible culverts. Cumulatively, these factors have contributed to declines in the distribution and abundance of native fish populations. Recovery of fish populations requires that a watershed approach be developed that incorporates long-term aquatic habitat needs and promotes sound land use practices and cooperation among natural resource management agencies. In this document, the authors (1) describe completed and ongoing habitat improvement and fish passage activities under the Hungry Horse Fisheries Mitigation Program, (2) describe recently identified projects that are in the planning stage, and (3) develop a framework for identifying prioritizing, implementing, and evaluating future fish habitat improvement and passage projects.

  10. Hydroacoustic Evaluation of Overwintering Summer Steelhead Fallback and Kelt Passage at The Dalles Dam Turbines, Early Spring 2011

    Energy Technology Data Exchange (ETDEWEB)

    Khan, Fenton; Royer, Ida M.

    2012-02-01

    This report presents the results of an evaluation of overwintering summer steelhead (Oncorhynchus mykiss) fallback and early out-migrating steelhead kelts downstream passage at The Dalles Dam turbines during early spring 2011. The study was conducted by Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers, Portland District (USACE) to investigate whether adult steelhead are passing through turbines during early spring before annual sluiceway operations typically begin. The sluiceway surface flow outlet is the optimal non-turbine route for adult steelhead, although operating the sluiceway reduces hydropower production. This is a follow-up study to similar studies of adult steelhead passage at the sluiceway and turbines we conducted in the fall/winter 2008, early spring 2009, fall/winter 2009, and early spring 2010. The goal of the 2011 study was to characterize adult steelhead passage rates at the turbines while the sluiceway was closed so fisheries managers would have additional information to use in decision-making relative to sluiceway operations. Sluiceway operations were not scheduled to begin until April 10, 2011. However, based on a management decision in late February, sluiceway operations commenced on March 1, 2011. Therefore, this study provided estimates of fish passage rates through the turbines, and not the sluiceway, while the sluiceway was open. The study period was March 1 through April 10, 2011 (41 days total). The study objective was to estimate the number and distribution of adult steelhead and kelt-sized targets passing into turbine units. We obtained fish passage data using fixed-location hydroacoustics with transducers deployed at all 22 main turbine units at The Dalles Dam. Adult steelhead passage through the turbines occurred on 9 days during the study (March 9, 12, 30, and 31 and April 2, 3, 5, 7, and 9). We estimated a total of 215 {+-} 98 (95% confidence interval) adult steelhead targets passed through the

  11. Synthesis of Sensor Fish Data for Assessment of Fish Passage Conditions at Turbines, Spillways, and Bypass Facilities – Phase 1: The Dalles Dam Spillway Case Study

    Energy Technology Data Exchange (ETDEWEB)

    Deng, Zhiqun; Serkowski, John A.; Fu, Tao; Carlson, Thomas J.; Richmond, Marshall C.

    2007-12-31

    This report summarizes the characterization of spillway passage conditions at The Dalles Dam in 2006 and the effort to complete a comprehensive database for data sets from The Dalles Dam spillway Sensor Fish and balloon-tagged live fish experiments. Through The Dalles Dam spillway case study, Pacific Northwest National Laboratory (PNNL) researchers evaluated the database as an efficient means for accessing and retrieving system-wide data for the U.S Army Corps of Engineers (USACE).

  12. Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam with Emphasis on the Prototype Surface Flow Outlet, 2008

    Energy Technology Data Exchange (ETDEWEB)

    Weiland, Mark A.; Ploskey, Gene R.; Hughes, James S.; Deng, Zhiqun; Fu, Tao; Monter, Tyrell J.; Johnson, Gary E.; Khan, Fenton; Wilberding, Matthew C.; Cushing, Aaron W.; Zimmerman, Shon A.; Faber, Derrek M.; Durham, Robin E.; Townsend, Richard L.; Skalski, John R.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.

    2009-12-01

    The main purpose of the study was to evaluate the performance of Top Spill Weirs installed at two spillbays at John Day Dam and evaluate the effectiveness of these surface flow outlets at attracting juvenile salmon away from the powerhouse and reducing turbine passage. The Juvenile Salmonid Acoustic Telemetry System (JSATS) was used to estimate survival of juvenile salmonids passing the dam and also for calculating performance metrics used to evaluate the efficiency and effectiveness of the dam at passing juvenile salmonids.

  13. Characterization of Fish Passage Conditions through a Francis Turbine, Spillway, and Regulating Outlet at Detroit Dam, Oregon, Using Sensor Fish, 2009

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, Joanne P.; Carlson, Thomas J.

    2011-05-06

    Fish passage conditions through two spillways, a Francis turbine, and a regulating outlet (RO) at Detroit Dam on the North Santiam River in Oregon were evaluated by Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers (USACE), Portland District, using Sensor Fish devices. The objective of the study was to describe and compare passage exposure conditions, identifying potential fish injury regions within the routes. The study was performed in July, October, and December 2009 concurrent with HI-Z balloon-tag studies by Normandeau Associates, Inc. Sensor Fish data were analyzed to estimate 1) exposure conditions, particularly exposure to severe strike, collision, and shear events by passage route sub-regions; 2) differences in passage conditions between passage routes; and 3) relationships to live-fish injury and mortality data estimates. Comparison of the three passage routes evaluated at Detroit Dam indicates that the RO passage route through the 5-ft gate opening was relatively the safest route for fish passage under the operating conditions tested; turbine passage was the most deleterious. These observations were supported also by the survival and malady estimates obtained from live-fish testing. Injury rates were highest for turbine and spillway passage. However, none of the passage routes tested is safe for juvenile salmonid passage.

  14. Fish monitoring project -- Oregon: Smolt monitoring activities at Little Goose Dam in 1996. Annual Report 1996

    International Nuclear Information System (INIS)

    Setter, A.

    1998-01-01

    The juvenile fish facility at Little Goose Dam is operated seasonally to collect and bypass downstream migrating smolts and keep them from passing through the turbine blades. Fish are diverted from turbines by traveling screens as they sound in the forebay to pass the dam. A small percentage of the passing fish are sampled on a daily basis to provide information on fish condition, species composition, migration timing, and size distribution. Oregon Department of Fish and Wildlife personnel perform daily fish sampling and data collection. Physical operation of the facility is the responsibility of the US Army Corps of Engineers. Data is reported to the Fish Passage Center daily by means of electronic data transfer. Funding for this project was provided through the Smolt Monitoring Program administered by the Fish Passage Center. Overall, the number of fish collected and sampled in 1996 was a reduction from the previous years of operation. The 1996 migration season was characterized by higher than average flows and greater spill frequency at the dam. It was the first year that coho salmon were obtained in the sample. The predominant species collected was steelhead with hatchery fish outnumbering wild fish by a ratio of 8:1. An increased emphasis was placed on gas bubble trauma examination and a routine, consistent effort was implemented using a protocol established by the Fish Passage Center. The objective of the gas bubble trauma (GBT) examinations was to document the relative incidence of symptoms throughout the migration season

  15. The effects of turbine passage on C-start behavior of salmon at the Wanapum Dam, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Cada, Glenn F. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Ryon, Michael G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Smith, John G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Luckett, Cloe A. [Oak Ridge Inst. for Science and Education (ORISE), Oak Ridge, TN (United States)

    2006-06-01

    In 2005, Grant County Public Utility District No. 2 (GCPUD) replaced one of the 10 Kaplan turbines at Wanapum Dam with an advanced turbine that was developed with support from the U.S. Department of Energy’s Advanced Hydropower Turbine System Program. Compared to a conventional Kaplan turbine, the advanced minimum gap runner (MGR) turbine is predicted to have lower values for several potential fish injury mechanisms, and therefore was expected to improve turbine-passage fish survival. Fish survival tests of the new turbine were carried out by GCPUD between February and April 2005. A total of 8,960 tagged juvenile summer Chinook salmon were used to quantify the differences in direct mortality associated with turbine passage for the new and old turbines. There were few test conditions in which the study was noted a distinct difference between the old Kaplan turbine and the new MGR turbine on the basis of changes in the escape behavior of uninjured fish.

  16. Identifying and Evaluating Options for Improving Sediment Management and Fish Passage at Hydropower Dams in the Lower Mekong River Basin

    Science.gov (United States)

    Wild, T. B.; Reed, P. M.; Loucks, D. P.

    2015-12-01

    The Mekong River basin in Southeast Asia is undergoing intensive and pervasive hydropower development to satisfy demand for increased energy and income to support its growing population of 60 million people. Just 20 years ago this river flowed freely. Today some 30 large dams exist in the basin, and over 100 more are being planned for construction. These dams will alter the river's natural water, sediment and nutrient flows, thereby impacting river morphology and ecosystems, and will fragment fish migration pathways. In doing so, they will degrade one of the world's most valuable and productive freshwater fish habitats. For those dams that have not yet been constructed, there still exist opportunities to modify their siting, design and operation (SDO) to potentially achieve a more balanced set of tradeoffs among hydropower production, sediment/nutrient passage and fish passage. We introduce examples of such alternative SDO opportunities for Sambor Dam in Cambodia, planned to be constructed on the main stem of the Mekong River. To evaluate the performance of such alternatives, we developed a Python-based simulation tool called PySedSim. PySedSim is a daily time step mass balance model that identifies the relative tradeoffs among hydropower production, and flow and sediment regime alteration, associated with reservoir sediment management techniques such as flushing, sluicing, bypassing, density current venting and dredging. To date, there has been a very limited acknowledgement or evaluation of the significant uncertainties that impact the evaluation of SDO alternatives. This research is formalizing a model diagnostic assessment of the key assumptions and parametric uncertainties that strongly influence PySedSim SDO evaluations. Using stochastic hydrology and sediment load data, our diagnostic assessment evaluates and compares several Sambor Dam alternatives using several performance measures related to energy production, sediment trapping and regime alteration, and

  17. Sensor Fish Characterization of Fish Passage Conditions through John Day Dam Spillbay 20 with a Modified Flow Deflector

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, Joanne P.

    2011-04-29

    Fish passage conditions over a modified deflector in Spillbay 20 at John Day Dam were evaluated by Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers (USACE), Portland District, using Sensor Fish devices. The objectives of the study were to describe and compare passage exposure conditions at two spill discharges, 2.4 and 4.0 thousand cubic feet per second (kcfs), identifying potential fish injury regions within the routes, and to evaluate a low-tailwater condition at the 2.4-kcfs discharge. The study was performed in April 2010 concurrent with HI-Z balloon-tag studies by Normandeau Associates, Inc. Sensor Fish data were analyzed to estimate 1) exposure conditions, particularly exposure to severe collision and shear events; 2) differences in passage conditions between treatments; and 3) relationships to live-fish injury and mortality data estimates. Nearly all Sensor Fish significant events were classified as collisions; the most severe occurred at the gate, on the spillbay chute, or at the deflector transition. Collisions in the gate region were observed only during the 2.4-kcfs discharge, when the tainter gate was open 1.2 ft. One shear event was observed during the evaluation, occurring at the deflector transition during passage at the 2.4-kcfs discharge at low tailwater. Flow quality, computed using the Sensor Fish turbulence index, was best for passage at the low-flow low-tailwater condition as well. The worst flow quality was observed for the 4.0-kcfs test condition. Contrasting the passage exposure conditions, the 2.4-kcfs low-tailwater treatment would be most deleterious to fish survival and well-being.

  18. ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project

    International Nuclear Information System (INIS)

    Walker, Randy M.; Gross, Ian G.; Smith, Cyrus M.; Hill, David E.

    2011-01-01

    Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal sponsor

  19. ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project

    Energy Technology Data Exchange (ETDEWEB)

    Walker, Randy M [ORNL; Gross, Ian G [ORNL; Smith, Cyrus M [ORNL; Hill, David E [ORNL

    2011-11-01

    Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to

  20. Migration depth and residence time of juvenile salmonids in the forebays of hydropower dams prior to passage through turbines or juvenile bypass systems: implications for turbine-passage survival.

    Science.gov (United States)

    Li, Xinya; Deng, Zhiqun D; Brown, Richard S; Fu, Tao; Martinez, Jayson J; McMichael, Geoffrey A; Skalski, John R; Townsend, Richard L; Trumbo, Bradly A; Ahmann, Martin L; Renholds, Jon F

    2015-01-01

    Little is known about the three-dimensional depth distributions in rivers of individually marked fish that are in close proximity to hydropower facilities. Knowledge of the depth distributions of fish approaching dams can be used to understand how vulnerable fish are to injuries such as barotrauma as they pass through dams. To predict the possibility of barotrauma injury caused by pressure changes during turbine passage, it is necessary to understand fish behaviour relative to acclimation depth in dam forebays as they approach turbines. A guiding study was conducted using high-resolution three-dimensional tracking results of salmonids implanted with Juvenile Salmon Acoustic Telemetry System transmitters to investigate the depth distributions of subyearling and yearling Chinook salmon (Oncorhynchus tshawytscha) and juvenile steelhead (Oncorhynchus mykiss) passing two dams on the Snake River in Washington State. Multiple approaches were evaluated to describe the depth at which fish were acclimated, and statistical analyses were performed on large data sets extracted from ∼28 000 individually tagged fish during 2012 and 2013. Our study identified patterns of depth distributions of juvenile salmonids in forebays prior to passage through turbines or juvenile bypass systems. This research indicates that the median depth at which juvenile salmonids approached turbines ranged from 2.8 to 12.2 m, with the depths varying by species/life history, year, location (which dam) and diel period (between day and night). One of the most enlightening findings was the difference in dam passage associated with the diel period. The amount of time that turbine-passed fish spent in the immediate forebay prior to entering the powerhouse was much lower during the night than during the day. This research will allow scientists to understand turbine-passage survival better and enable them to assess more accurately the effects of dam passage on juvenile salmon survival.

  1. Survival Estimates for the Passage of Spring-Migrating Juvenile Salmonids through Snake and Columbia River Dams and Reservoirs, 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Faulkner, James R.; Smith, Steven G.; Muir, William D. [Northwest Fisheries Science Center

    2009-06-23

    In 2008, the National Marine Fisheries Service completed the sixteenth year of a study to estimate survival and travel time of juvenile salmonids Oncorhynchus spp. passing through dams and reservoirs on the Snake and Columbia Rivers. All estimates were derived from detections of fish tagged with passive integrated transponder (PIT) tags. We PIT tagged and released a total of 18,565 hatchery steelhead O. mykiss, 15,991 wild steelhead, and 9,714 wild yearling Chinook salmon O. tshawytscha at Lower Granite Dam in the Snake River. In addition, we utilized fish PIT tagged by other agencies at traps and hatcheries upstream from the hydropower system and at sites within the hydropower system in both the Snake and Columbia Rivers. These included 122,061 yearling Chinook salmon tagged at Lower Granite Dam for evaluation of latent mortality related to passage through Snake River dams. PIT-tagged smolts were detected at interrogation facilities at Lower Granite, Little Goose, Lower Monumental, Ice Harbor, McNary, John Day, and Bonneville Dams and in the PIT-tag detector trawl operated in the Columbia River estuary. Survival estimates were calculated using a statistical model for tag-recapture data from single release groups (the single-release model). Primary research objectives in 2008 were to: (1) estimate reach survival and travel time in the Snake and Columbia Rivers throughout the migration period of yearling Chinook salmon and steelhead, (2) evaluate relationships between survival estimates and migration conditions, and (3) evaluate the survival estimation models under prevailing conditions. This report provides reach survival and travel time estimates for 2008 for PIT-tagged yearling Chinook salmon (hatchery and wild), hatchery sockeye salmon O. nerka, hatchery coho salmon O. kisutch, and steelhead (hatchery and wild) in the Snake and Columbia Rivers. Additional details on the methodology and statistical models used are provided in previous reports cited here. Survival

  2. Route-Specific Passage and Survival of Steelhead Kelts at The Dalles and Bonneville Dams, 2012 - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Rayamajhi, Bishes; Ploskey, Gene R.; Woodley, Christa M.; Weiland, Mark A.; Faber, Derek M.; Kim, Jin A.; Colotelo, Alison HA; Deng, Zhiqun; Fu, Tao

    2013-07-31

    This study was mainly focused on evaluating the route-specific passage and migration success of steelhead kelts passing downstream through The Dalles Dam (TDA) and Bonneville Dam (BON) at Columbia River (CR) river kilometers 309 and 234 respectively. Oregon Department of Fish and Wildlife (ODFW) personnel collected, tagged and released out-migrating steelhead kelts in the tributaries of the Deschutes River, 15 Mile Creek and Hood River between April 14 and June 4, 2012. A PIT tag was injected into each kelt’s dorsal sinus whereas a Juvenile Salmon Acoustic Telemetry System (JSATS) acoustic micro-transmitter was attached to an external FLoy T-bar tag and inserted into the dorsal back musculature using a Floy tagging gun. JSATS cabled arrays were deployed at TDA and BON and autonomous node arrays were deployed near Celilo, Oregon (CR325); the BON forebay (CR236); the BON tailrace (CR233); near Knapp, Washington (CR156); and near Kalama, Washington (CR113) to monitor the kelts movement while passing through the dams and above mentioned river cross-sections.

  3. Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival Proportions at John Day Dam, 2009

    Energy Technology Data Exchange (ETDEWEB)

    Weiland, Mark A.; Ploskey, Gene R.; Hughes, James S.; Deng, Zhiqun; Fu, Tao; Kim, Jin A.; Johnson, Gary E.; Fischer, Eric S.; Khan, Fenton; Zimmerman, Shon A.; Faber, Derrek M.; Carter, Kathleen M.; Boyd, James W.; Townsend, Richard L.; Skalski, J. R.; Monter, Tyrell J.; Cushing, Aaron W.; Wilberding, Matthew C.; Meyer, Matthew M.

    2011-09-28

    The overall purpose of the acoustic telemetry study at JDA during 2009 was to determine the best configuration and operation for JDA prior to conducting BiOp performance standard tests. The primary objective was to determine the best operation between 30% and 40% spill treatments. Route-specific and JDA to TDA forebay survival estimates, passage distribution, and timing/behavior metrics were used for comparison of 30% to a 40% spill treatments. A secondary objective was to evaluate the performance of TSWs installed in spill bays 15 and 16 and to estimate fish survival rates and passage efficiencies under 30% and 40% spill-discharge treatments each season.

  4. Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008

    International Nuclear Information System (INIS)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R.L.; Fu, Tao; Skalski, J.R.; Fischer, Eric S.

    2010-01-01

    Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam. In 2008, the Portland District of the U.S. Army Corps of Engineers contracted with the Pacific Northwest National Laboratory (PNNL) to conduct an acoustic telemetry study to evaluate a newly deployed 700-ft-long and 10-ft-deep behavioral guidance structure (BGS) located in the forebay of the Bonneville Dam second powerhouse (B2) and to estimate the survival of yearling Chinook salmon, subyearling Chinook salmon, and juvenile steelhead passing downstream through this powerhouse. The BGS was deployed to increase the survival of fish passing B2 by increasing the percentage of outmigrating smolts entering the B2 Corner Collector, a surface flow outlet known to be a relatively benign route for downstream passage at this dam. Fish longer than 95 mm were surgically implanted with Juvenile Salmon Acoustic Telemetry System (JSATS) and passive integrated transponder (PIT) tags, held overnight in tanks supplied with continuous flow of river water to allow time for recovery from surgery and released upstream as part of two concurrent survival studies that were evaluating survival at John Day Dam and the Bonneville spillway. Tagged fish were released at or downstream of Arlington, Oregon, approximately 156 km upstream on the Columbia River. Additional release points included the tailwaters of John Day Dam and The Dalles Dam. The volitional movements of the tagged migrants were subsequently tracked through the B2 forebay to their eventual route of passage. Passage location was recorded and incorporated with detections from three downstream survival arrays to produce survival estimates. The tracked positions of fish in the forebay and passage distribution at B2 were evaluated to determine behavior relative to the BGS location.

  5. A barrier to upstream migration in the fish passage of Itaipu Dam (Canal da Piracema, Paraná River basin

    Directory of Open Access Journals (Sweden)

    Hélio Martins Fontes Júnior

    Full Text Available The majority of the fish passages built in the Neotropical region are characterised by low efficiency and high selectivity; in many cases, the benefits to fish populations are uncertain. Studies conducted in the Canal da Piracema at Itaipu dam on the Parana River indicate that the system component designated as the Discharge channel in the Bela Vista River (herein named Canal de deságue no rio Bela Vista or CABV, a 200 m long technical section, was the main barrier to the upstream migration. The aim of this study was to evaluate the degree of restriction imposed by the CABV on upstream movements of Prochilodus lineatus and Leporinus elongatus, Characiformes. Fish were tagged with passive integrated transponders (PIT tags and released both downstream and upstream of this critical section. Individuals of both species released downstream of the CABV took much more time to reach the upper end of the system (43.6 days vs. 15.9 days, and passed in much lower proportions (18% vs. 60.8% than those tagged upstream of this component. Although more work is needed to differentiate between fishway effects and natural variation in migratory motivation, the results clearly demonstrate passage problems at the CABV.

  6. A barrier to upstream migration in the fish passage of Itaipu Dam (Canal da Piracema), Paraná River basin

    Science.gov (United States)

    ,; Fontes Júnior, Hélio Martins; Makrakis, Sergio; Gomes, Luiz Carlos; Latini, João Dirço

    2012-01-01

    The majority of the fish passages built in the Neotropical region are characterised by low efficiency and high selectivity; in many cases, the benefits to fish populations are uncertain. Studies conducted in the Canal da Piracema at Itaipu dam on the Parana River indicate that the system component designated as the Discharge channel in the Bela Vista River (herein named Canal de deságue no rio Bela Vista or CABV), a 200 m long technical section, was the main barrier to the upstream migration. The aim of this study was to evaluate the degree of restriction imposed by the CABV on upstream movements of Prochilodus lineatus and Leporinus elongatus, Characiformes. Fish were tagged with passive integrated transponders (PIT tags) and released both downstream and upstream of this critical section. Individuals of both species released downstream of the CABV took much more time to reach the upper end of the system (43.6 days vs. 15.9 days), and passed in much lower proportions (18% vs. 60.8%) than those tagged upstream of this component. Although more work is needed to differentiate between fishway effects and natural variation in migratory motivation, the results clearly demonstrate passage problems at the CABV.

  7. Survival estimates for the passage of juvenile salmonids through Snake River dams and reservoirs, 1996. Annual report

    International Nuclear Information System (INIS)

    Smith, S.G.; Muir, W.D.; Hockersmith, E.E.; Achord, S.; Eppard, M.B.; Ruehle, T.E.; Williams, J.G.

    1998-02-01

    In 1996, the National Marine Fisheries Service and the University of Washington completed the fourth year of a multi-year study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake River. Actively migrating smolts were collected near the head of Lower Granite Reservoir and at Lower Granite Dam, tagged with passive integrated transponder (PIT) tags, and released to continue their downstream migration. Individual smolts were subsequently detected at PIT-tag detection facilities at Lower Granite, Little Goose, Lower Monumental, McNary, John Day and Bonneville Dams. Survival estimates were calculated using the Single-Release (SR) and Paired-Release (PR) Models. Timing of releases of tagged hatchery steelhead (O. mykiss) from the head of Lower Granite Reservoir and yearling chinook salmon (O. tshawytscha) from Lower Granite Dam in 1996 spanned the major portion of their juvenile migrations. Specific research objectives in 1996 were to (1) estimate reach and project survival in the Snake River using the Single-Release and Paired-Release Models throughout the yearling chinook salmon and steelhead migrations, (2) evaluate the performance of the survival-estimation models under prevailing operational and environmental conditions in the Snake River, and (3) synthesize results from the 4 years of the study to investigate relationships between survival probabilities, travel times, and environmental factors such as flow levels and water temperature

  8. Survival Estimates for the Passage of Juvenile Salmonids through Snake River Dams and Reservoirs, 1996 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Steven G.

    1998-02-01

    In 1996, the National Marine Fisheries Service and the University of Washington completed the fourth year of a multi-year study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake River. Actively migrating smolts were collected near the head of Lower Granite Reservoir and at Lower Granite Dam, tagged with passive integrated transponder (PIT) tags, and released to continue their downstream migration. Individual smolts were subsequently detected at PIT-tag detection facilities at Lower Granite, Little Goose, Lower Monumental, McNary, John Day and Bonneville Dams. Survival estimates were calculated using the Single-Release (SR) and Paired-Release (PR) Models. Timing of releases of tagged hatchery steelhead (O. mykiss) from the head of Lower Granite Reservoir and yearling chinook salmon (O. tshawytscha) from Lower Granite Dam in 1996 spanned the major portion of their juvenile migrations. Specific research objectives in 1996 were to (1) estimate reach and project survival in the Snake River using the Single-Release and Paired-Release Models throughout the yearling chinook salmon and steelhead migrations, (2) evaluate the performance of the survival-estimation models under prevailing operational and environmental conditions in the Snake River, and (3) synthesize results from the 4 years of the study to investigate relationships between survival probabilities, travel times, and environmental factors such as flow levels and water temperature.

  9. Dams

    Data.gov (United States)

    Vermont Center for Geographic Information — This dataset �is generated from from the Vermont Dam Inventory (VDI). The VDI is managed by the VT DEC's Dam Safety and Hydrology Section and contains information...

  10. Synthesis of downstream fish passage information at projects owned by the U.S. Army Corps of Engineers in the Willamette River Basin, Oregon

    Science.gov (United States)

    Hansen, Amy C.; Kock, Tobias J.; Hansen, Gabriel S.

    2017-08-07

    The U.S. Army Corps of Engineers (USACE) operates the Willamette Valley Project (Project) in northwestern Oregon, which includes a series of dams, reservoirs, revetments, and fish hatcheries. Project dams were constructed during the 1950s and 1960s on rivers that supported populations of spring Chinook salmon (Oncorhynchus tshawytscha), winter steelhead (O. mykiss), and other anadromous fish species in the Willamette River Basin. These dams, and the reservoirs they created, negatively affected anadromous fish populations. Efforts are currently underway to improve passage conditions within the Project and enhance populations of anadromous fish species. Research on downstream fish passage within the Project has occurred since 1960 and these efforts are documented in numerous reports and publications. These studies are important resources to managers in the Project, so the USACE requested a synthesis of existing literature that could serve as a resource for future decision-making processes. In 2016, the U.S. Geological Survey conducted an extensive literature review on downstream fish passage studies within the Project. We identified 116 documents that described studies conducted during 1960–2016. Each of these documents were obtained, reviewed, and organized by their content to describe the state-of-knowledge within four subbasins in the Project, which include the North Santiam, South Santiam, McKenzie, and Middle Fork Willamette Rivers. In this document, we summarize key findings from various studies on downstream fish passage in the Willamette Project. Readers are advised to review specific reports of interest to insure that study methods, results, and additional considerations are fully understood.

  11. 77 FR 67813 - Sam Rayburn Dam Project Power Rate

    Science.gov (United States)

    2012-11-14

    ... DEPARTMENT OF ENERGY Southwestern Power Administration Sam Rayburn Dam Project Power Rate AGENCY: Southwestern Power Administration, DOE. ACTION: Notice of Rate Order Approving an Extension of Power Rate on an.... James K. McDonald, Assistant Administrator, Southwestern Power Administration, Department of Energy...

  12. Rainfall response to Dam/Irrigation projects in Northern Nigeria ...

    African Journals Online (AJOL)

    In this paper, we examine the possibility that the increasing number and size of dam/irrigation projects in northern Nigeria are having a corresponding increase in rainfall in spite of the threat of climate change. We modeled the rainfall trends over 11 meteorological stations over a period of 34 years (1971 - 2004). The trends ...

  13. Rainfall response to dam/irrigation projects in northern Nigeria ...

    African Journals Online (AJOL)

    In this paper, we examine the possibility that the increasing number and size of dam/irrigation projects in northern Nigeria are having a corresponding increase in rainfall in spite of the threat of climate change. We modeled the rainfall trends over 11 meteorological stations over a period of 34 years (1971 - 2004). The trends ...

  14. Passage Distribution and Federal Columbia River Power System Survival for Steelhead Kelts Tagged Above and at Lower Granite Dam, Year 2

    Energy Technology Data Exchange (ETDEWEB)

    Colotelo, Alison H.A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Harnish, Ryan A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Jones, Bryan W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hanson, Amanda C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Trott, Donna M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Greiner, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mcmichael, Geoffrey A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ham, Kenneth D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Deng, Zhiqun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Brown, Richard S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Weiland, Mark A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Li, Xinya [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fu, Tao [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-12-15

    Steelhead (Oncorhynchus mykiss) populations have declined throughout their range in the last century and many populations, including those of the Snake River Basin are listed under the Endangered Species Act of 1973. The reasons for their decline are many and complex, but include habitat loss and degradation, overharvesting, and dam construction. The 2008 Biological Opinion calls for an increase in the abundance of female steelhead through an increase in iteroparity (i.e., repeat spawning) and this can be realized through a combination of reconditioning and in-river survival of migrating kelts. The goal of this study is to provide the data necessary to inform fisheries managers and dam operators of Snake River kelt migration patterns, survival, and routes of dam passage. Steelhead kelts (n = 487) were captured and implanted with acoustic transmitters and passive integrated transponder (PIT)-tags at the Lower Granite Dam (LGR) Juvenile Fish Facility and at weirs located in tributaries of the Snake and Clearwater rivers upstream of LGR. Kelts were monitored as they moved downstream through the Federal Columbia River Power System (FCRPS) by 15 autonomous and 3 cabled acoustic receiver arrays. Cabled receiver arrays deployed on the dam faces allowed for three-dimensional tracking of fish as they approached the dam face and were used to determine the route of dam passage. Overall, 27.3% of the kelts tagged in this study successfully migrated to Martin Bluff (rkm 126, as measured from the mouth of the Columbia River), which is located downstream of all FCRPS dams. Within individual river reaches, survival per kilometer estimates ranged from 0.958 to 0.999; the lowest estimates were observed in the immediate forebay of FCRPS dams. Steelhead kelts tagged in this study passed over the spillway routes (spillway weirs, traditional spill bays) in greater proportions and survived at higher rates compared to the few fish passed through powerhouse routes (turbines and juvenile

  15. Passage Distribution and Federal Columbia River Power System Survival for Steelhead Kelts Tagged Above and at Lower Granite Dam, Year 2

    Energy Technology Data Exchange (ETDEWEB)

    Colotelo, Alison HA; Harnish, Ryan A.; Jones, Bryan W.; Hanson, Amanda C.; Trott, Donna M.; Greiner, Michael J.; McMichael, Geoffrey A.; Ham, Kenneth D.; Deng, Zhiqun; Brown, Richard S.; Weiland, Mark A.; Li, X.; Fu, Tao

    2014-03-28

    Steelhead (Oncorhynchus mykiss) populations have declined throughout their range in the last century and many populations, including those of the Snake River Basin are listed under the Endangered Species Act of 1973. The reasons for their decline are many and complex, but include habitat loss and degradation, overharvesting, and dam construction. The 2008 Biological Opinion calls for an increase in the abundance of female steelhead through an increase in iteroparity (i.e., repeat spawning) and this can be realized through a combination of reconditioning and in-river survival of migrating kelts. The goal of this study is to provide the data necessary to inform fisheries managers and dam operators of Snake River kelt migration patterns, survival, and routes of dam passage. Steelhead kelts (n = 487) were captured and implanted with acoustic transmitters and passive integrated transponder (PIT)-tags at the Lower Granite Dam (LGR) Juvenile Fish Facility and at weirs located in tributaries of the Snake and Clearwater rivers upstream of LGR. Kelts were monitored as they moved downstream through the Federal Columbia River Power System (FCRPS) by 15 autonomous and 3 cabled acoustic receiver arrays. Cabled receiver arrays deployed on the dam faces allowed for three-dimensional tracking of fish as they approached the dam face and were used to determine the route of dam passage. Overall, 27.3% of the kelts tagged in this study successfully migrated to Martin Bluff (rkm 126, as measured from the mouth of the Columbia River), which is located downstream of all FCRPS dams. Within individual river reaches, survival per kilometer estimates ranged from 0.958 to 0.999; the lowest estimates were observed in the immediate forebay of FCRPS dams. Steelhead kelts tagged in this study passed over the spillway routes (spillway weirs, traditional spill bays) in greater proportions and survived at higher rates compared to the few fish passed through powerhouse routes (turbines and juvenile

  16. Characterizing the Fish Passage Environment at The Dalles Dam Spillway: 2001-2004

    Energy Technology Data Exchange (ETDEWEB)

    Richmond, Marshall C.; Carlson, Thomas J.; Serkowski, John A.; Cook, Chris B.; Duncan, Joanne P.; Perkins, William A.

    2007-10-10

    The spill environment at The Dalles Dam in 2001-2004 was characterized using a field-deployed autonomous sensor (the so-called Sensor Fish), computational fluid dynamics (CFD) modeling, and Lagrangian particle tracking. The sensor fish has a self-contained capability to digitally the record pressure and triaxial accelerations it was exposed to following its release into the spillway. After recovery downstream of the tailrace, the data stored in the memory of the sensor are downloaded and stored for analysis. The spillway, stilling basin, and tailrace hydrodynamics were simulated using an unsteady, free-surface, three-dimensional CFD code that solved the Reynolds-averaged Navier-Stokes equations in conjunction with a two-equation turbulence model. The results from the CFD simulations were then used in a Lagrangian particle tracking model that included the effects of mass, drag, and buoyancy in the particle equation of motion. A random walk method was used to simulate the effects of small-scale turbulence on the particle motion. Several operational and structural conditions were evaluated using the Sensor Fish, CFD, and particle tracking. Quantifying events such as strike and stilling basin retention time characterized exposure conditions in the spill environment.

  17. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Science.gov (United States)

    2012-03-12

    ... Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted Service List for... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...)). The Commission's responsibilities pursuant to section 106 for the Martin Dam Hydroelectric Project...

  18. Olympic Dam project: assessment of the environmental impact

    International Nuclear Information System (INIS)

    1983-11-01

    The assessment report on the Environmental Impact Statement produced for the Olympic Dam project is intended to provide the South Australian Government with a comprehensive evaluation of the potential impact of the proposal and to make recommendations concerning the project to be negotiated with the Joint Venturers prior to approval of the EIS. The project involves the mining, processing and sale of products from the copper-uranium ore body at Olympic Dam on the Roxby Downs Station, South Australia. The report includes a description of the proposal, a description of the environment likely to be affected, a discussion of the potential impacts on that environment, a discussion of the adequacy of information presented in the EIS and a discussion of the acceptability of the environmental impacts. The Department has concluded that the pre-design proposal is acceptable on environmental grounds

  19. Management of environmental and radiation data - the Olympic Dam project

    International Nuclear Information System (INIS)

    Jenkins, B.

    1987-01-01

    In terms of data management the Olympic Dam Project is in a process of transition from investigative studies to operational monitoring. The data management requirements for investigative studies are quite different requirements and indicates the progress taken in this transition, as well as the directions being taken to complete this transition. The environmental and radiation management programs for the Olympic Dam Project have already stored 70 megabytes of data on computer. With the comprehensive monitoring requirements which have been, or are in the process of being established for production operations, the volume of data is increasing. There are six main areas involving environmental and radiation data management: project area environmental monitoring; monitoring of the impact pathway from groundwater extraction for water supply to possible effects on mound springs; radiation levels in the environment; radiation exposures to designated employees; other occupational exposures in the mine; medical records relevant to occupational health

  20. Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project, Annual Report 2001-2002.

    Energy Technology Data Exchange (ETDEWEB)

    Sears, Sheryl

    2003-01-01

    The construction of Chief Joseph and Grand Coulee Dams completely and irrevocably blocked anadromous fish migrations to the Upper Columbia River. Historically this area hosted vast numbers of salmon returning to their natal waters to reproduce and die. For the native peoples of the region, salmon and steelhead were a principle food source, providing physical nourishment and spiritual sustenance, and contributing to the religious practices and the cultural basis of tribal communities. The decaying remains of spawned-out salmon carcasses contributed untold amounts of nutrients into the aquatic, aerial, and terrestrial ecosystems of tributary habitats in the upper basin. Near the present site of Kettle Falls, Washington, the second largest Indian fishery in the state existed for thousands of years. Returning salmon were caught in nets and baskets or speared on their migration to the headwater of the Columbia River in British Columbia. Catch estimates at Kettle Falls range from 600,000 in 1940 to two (2) million around the turn of the century (UCUT, Report No.2). The loss of anadromous fish limited the opportunities for fisheries management and enhancement exclusively to those actions addressed to resident fish. The Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project is a mitigation project intended to enhance resident fish populations and to partially mitigate for anadromous fish losses caused by hydropower system impacts. This substitution of resident fish for anadromous fish losses is considered in-place and out-of-kind mitigation. Upstream migration and passage barriers limit the amount of spawning and rearing habitat that might otherwise be utilized by rainbow trout. The results of even limited stream surveys and habitat inventories indicated that a potential for increased natural production exists. However, the lack of any comprehensive enhancement measures prompted the Upper Columbia United Tribes Fisheries Center (UCUT), Colville Confederated

  1. Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Sears, Sheryl

    2004-01-01

    The construction of Chief Joseph and Grand Coulee Dams completely and irrevocably blocked anadromous fish migrations to the Upper Columbia River. Historically this area hosted vast numbers of salmon returning to their natal waters to reproduce and die. For the native peoples of the region, salmon and steelhead were a principle food source, providing physical nourishment and spiritual sustenance, and contributing to the religious practices and the cultural basis of tribal communities. The decaying remains of spawned-out salmon carcasses contributed untold amounts of nutrients into the aquatic, aerial, and terrestrial ecosystems of tributary habitats in the upper basin. Near the present site of Kettle Falls, Washington, the second largest Indian fishery in the state existed for thousands of years. Returning salmon were caught in nets and baskets or speared on their migration to the headwater of the Columbia River in British Columbia. Catch estimates at Kettle Falls range from 600,000 in 1940 to two (2) million around the turn of the century (UCUT, Report No.2). The loss of anadromous fish limited the opportunities for fisheries management and enhancement exclusively to those actions addressed to resident fish. The Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project is a mitigation project intended to enhance resident fish populations and to partially mitigate for anadromous fish losses caused by hydropower system impacts. This substitution of resident fish for anadromous fish losses is considered in-place and out-of-kind mitigation. Upstream migration and passage barriers limit the amount of spawning and rearing habitat that might otherwise be utilized by rainbow trout. The results of even limited stream surveys and habitat inventories indicated that a potential for increased natural production exists. However, the lack of any comprehensive enhancement measures prompted the Upper Columbia United Tribes Fisheries Center (UCUT), Colville Confederated

  2. 76 FR 18547 - Grand River Dam Authority, Salina Pumped Storage Project; Notice of Proposed Restricted Service...

    Science.gov (United States)

    2011-04-04

    ....O. Box OK 74350-0070. 1326, Miami, OK 74355. Charles Atkins, Grand River Dam Jodi Hayes, Shawnee... River Dam Authority, Salina Pumped Storage Project; Notice of Proposed Restricted Service List for a... consultation with certain parties listed below. Grand River Dam Authority, as licensee for Project No. 2524-018...

  3. 75 FR 30852 - Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado

    Science.gov (United States)

    2010-06-02

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Hydroelectric Power Development at Ridgway Dam... accept proposals, select lessee, and contract for hydroelectric power development at Ridgway Dam. SUMMARY...-Federal development of hydroelectric power at Ridgway Dam, a feature of the Dallas Creek Project...

  4. Attention to impact pathways in EISs of large dam projects

    International Nuclear Information System (INIS)

    Brismar, Anna

    2004-01-01

    The importance of addressing cumulative environmental impacts in Environmental Impact Statements (EISs) of large development projects is increasingly underlined. However, cumulative impacts are generated through complex impact pathways, involving multiple root causes and lower and higher order effects, interlinked by cause-effect relationships. Consideration to potential impact pathways may thus be difficult without appropriate analytical methods, expertise, and supportive Environmental Impact Assessment guidelines and terms-of-references (TOR). This paper presents the results of an analysis of six EISs prepared for large dam projects between 1994 and 2001. The objective was to analyze if, how, and to what extent potential impact pathways involved in the generation of dam-related cumulative impacts have been addressed in the analyzed material. For this purpose, a theoretical framework was developed, which identifies four key root causes, their potential effects, and associated cause-effect relationships. The analysis revealed various shortcomings. Important imbalances were found in the degree of attention given to effects of different categories. Lower order effects received greater attention than higher order, and the potential effects of reservoir filling were more extensively attended to than those of flow blockage, storage, and regulation. Most importantly, little effort was made to carefully explain the potential impact pathways involved; root causes were often referred to in general terms only, and potential pathways leading up to an anticipated higher order effect or following upon an expected lower order effect were often inadequately addressed or ignored. Probable reasons for the discovered shortcomings are discussed and recommendations are presented for improving the World Bank EIA guidelines for large dam projects

  5. The Victoria Project, Sri Lanka. Hydrological analysis for Victoria Dam

    Energy Technology Data Exchange (ETDEWEB)

    Piper, B.S. [GU Projects (United Kingdom); Sutcliffe, J.V. [Gibb (Sir Alexander) and Partners (United Kingdom); Parks, Y.P. [Institute of Hydrology (United Kingdom)

    1994-03-01

    The hydrological analyses described in this paper formed an important part of the studies for the Victoria Project of which the Victoria Dam is the major component. The purpose of the hydrological studies was to provide consistent sets of river flow and climate data at the sites of the major components of the project, and to provide flood estimates for sizing the spillway and river diversion works. This paper outlines the approach used in the overall study, and then concentrates on aspects of specific relevance to the Victoria Dam. The main hydrological characteristics of the upper Mahaweli basin are presented as an introduction to the overall water balance; the humid climate made the appraisal of flow records relatively simple. Time series modelling was used to fill gaps in the observed flow records used for reservoir operation studies. The spillway design flood was based on the probable maximum precipitation (PMP) derived by maximizing a historic storm in which rainfall approaching the PMP covered most of the basin. Construction floods of moderate return period were estimated from a dimensionless analysis of regional flood records. The main lessons to be drawn are that water balance methods are of particular value in these humid monsoon conditions, while the ratio of the PMP to the maximum recorded storm is lower than would be the case in more arid regions. (author)

  6. 76 FR 75542 - Porcupine Dam Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2011-12-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14290-000] Porcupine Dam Hydropower Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments...), proposing to study the feasibility of the Porcupine Dam Hydropower Project to be located on the East Fork of...

  7. 78 FR 35630 - Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact...

    Science.gov (United States)

    2013-06-13

    ... Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam Hydroelectric Project and Intention To Hold Public Meetings In accordance with the National Environmental Policy... the Martin Dam Hydroelectric Project (FERC No. 349), located on the Tallapoosa River in Tallapoosa...

  8. Environmental mitigation at hydroelectric projects. Volume 2, Benefits and costs of fish passage and protection

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Cada, G.F.; Jones, D.W. [Oak Ridge National Lab., TN (United States); Dauble, D.D. [Pacific Northwest Lab., Richland, WA (United States); Hunt, R.T. [Hunt (Richard) Associates, Inc., Concord, NH (United States); Costello, R.J. [Northwest Water Resources Advisory Services (United States)

    1994-01-01

    This study examines envirorunental mitigation practices that provide upstream and downstream fish passage and protection at hydroelectric projects. The study includes a survey of fish passage and protection mitigation practices at 1,825 hydroelectric plants regulated by the Federal Energy Regulatory Commission (FERC) to determine frequencies of occurrence, temporal trends, and regional practices based on FERC regions. The study also describes, in general terms, the fish passage/protection mitigation costs at 50 non-Federal hydroelectric projects. Sixteen case studies are used to examine in detail the benefits and costs of fish passage and protection. The 16 case studies include 15 FERC licensed or exempted hydroelectric projects and one Federally-owned and-operated hydroelectric project. The 16 hydroelectric projects are located in 12 states and range in capacity from 400 kilowatts to 840 megawatts. The fish passage and protection mitigation methods at the case studies include fish ladders and lifts, an Eicher screen, spill flows, airburst-cleaned inclined and cylindrical wedgewire screens, vertical barrier screens, and submerged traveling screens. The costs, benefits, monitoring methods, and operating characteristics of these and other mitigation methods used at the 16 case studies are examined.

  9. Numerical modelling dam break analysis for water supply project

    International Nuclear Information System (INIS)

    Lariyah, M S; Vikneswaran, M; Hidayah, B; Muda, Z C; Thiruchelvam, S; Isham, A K Abd; Rohani, H

    2013-01-01

    Dam provides many benefits to the society, but it can also cause extensive damage to downstream area when it fails. Dam failure can cause extensive damage to properties and loss of human life due to short warning time available. In general, dam spillway was designed to drain the maximum discharge from the dam during the Probable Maximum Flood (PMF). The spillway is functioned to prevent the dam from failure due to overtopping, which can lead to the dam failure. Dam failure will result in large volume of water travelling at very high velocity to the downstream area of the dam. It can cause extensive property damage, destruction of important facilities, and significant loss of human life along the way. Due to the potential of high hazard it poses to the downstream area, a dam break analysis is considered very essential. This paper focuses into the dam failure analysis for Kahang Dam by prediction of breach flow hydrographs and generation of inundation map at downstream area. From the PMF scenario simulation, the maximum inflow is 525.12 m 3 /s and peak discharge from the dam during dam failure is 6188m 3 /s. The results are able to provide information for preparation of Emergency Response Plan (PMF), in which appropriate steps can be taken by relevant authorities to avoid significant loss of human lives.

  10. 75 FR 62531 - Alabama Power Company; Project No. 349-150-Alabama Martin Dam Hydroelectric Project; Notice of...

    Science.gov (United States)

    2010-10-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Project No. 349-150--Alabama Martin Dam Hydroelectric Project; Notice of Proposed Restricted Service List for a... the Martin Dam Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the...

  11. Columbia River Salmonid Outmigration: McNary Dam Passage and Enhanced Smolt Quality, 1984 Second Year Completion Report.

    Energy Technology Data Exchange (ETDEWEB)

    Schreck, Carl B.

    1984-07-01

    The effects of the McNary Dam transportation system on emigrating fall and spring chinook smolts were evaluated using physiological indices of stress (e.g., plasma cortisol, hepatic glycogen, leucocrit, interrenal cell nuclear diameter) and performance tests (e.g., saltwater challenge, secondary stress challenge, disease resistance). Controlled experiments were conducted in a hatchery environment to characterize the fishes' physiological responses to stress, and disease resistance to allow a basis for judging the nature of the stress experienced by smolts at McNary Dam. 55 figs., 3 tabs.

  12. Survival Estimates for the Passage of Juvenile Salmonids through Snake River Dams and Reservoirs, 1994 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Muir, William D.

    1995-02-01

    In 1994, the National Marine Fisheries Service and the University of Washington completed the second year of a multi-year study to estimate survival of juvenile salmonids (Oncorhynchus spp.) passing through the dams and reservoirs of the Snake River. Actively migrating smolts were collected at selected locations above, at, and below Lower Granite Dam, tagged with passive integrated transponder (PIT) tags, and released to continue their downstream migration. Survival estimates were calculated using the Single-Release, Modified Single-Release, and Paired-Release Models.

  13. In the Land of the Dammed: Assessing Governance in Resettlement of Ghana’s Bui Dam Project

    Directory of Open Access Journals (Sweden)

    Kwabena Asiama

    2017-11-01

    Full Text Available Resettlement resulting from dam construction has raised several concerns due to the negative aftermath impacts. In Ghana, the construction of three hydroelectric dams resulted in large-scale resettlements. Given the little experience that Ghana has in resettlements, it is necessary for a robust monitoring structure for resettlements. However, this was not available in the last resettlement undertaken for the Bui Dam Project. This paper aims at developing an assessment framework for monitoring resettlement activities on customary lands from a good governance perspective. Based on four good governance principles, transparency, public participation and inclusiveness, equity and rule of law and accountability, a good governance assessment framework is built and applied to the Bui Dam Project using a case study approach. Data were collected through interviews and focus group discussion with the key actors of the resettlement project. It was first found that the planning stage of the resettlement came out with a robust plan that was to prevent the impoverishment of the affected persons. However, in the implementation of the resettlement, not all good governance principles were adhered to. In conclusion, it was found that by deconstructing the resettlement process with a good governance framework, the problematic areas of the resettlement can be effectively differentiated between the planning and implementation phases.

  14. Evaluation of Dual Frequency Identification Sonar (DIDSON) for Monitoring Pacific Lamprey Passage Behavior at Fishways of Bonneville Dam, 2011

    Science.gov (United States)

    2012-01-01

    Washington’s Applied Physics Laboratory (Belcher et al. 1999, 2001; Tiffan et al. 2004) and uses a high resolution acoustic lens to produce images of...monitor fish entrainment. Hydro Review. 10(4). Ransom, B. H., and T. W. Steig. 1994. Using hydroacoustics to monitor fish at hydropower dams...Lake and Reservoir Management 9(1):163-169. 72 Ransom, B. H., T. W. Steig, and P. A. Nealson. 1996. Comparison of hydroacoustic and net

  15. Umatilla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P.; Loffink, Ken; Duke, Bill

    2008-12-31

    adult Pacific lamprey was trapped and released above the Westland ladder this year. The Threemile Dam west bank juvenile bypass was opened on March 11, 2008 in conjunction with water deliveries and continued through the summer. West Extension Irrigation District (WEID) discontinued diverting live flow on June 24, 2008 but the bypass remained open throughout the project year. The juvenile trap was not operated this project year.

  16. 75 FR 15458 - Request for Small Reclamation Projects Act Loan To Construct Narrows Dam in Sanpete County, UT

    Science.gov (United States)

    2010-03-29

    ... Projects Act Loan To Construct Narrows Dam in Sanpete County, UT AGENCY: Bureau of Reclamation, Interior... construction by SWCD of the proposed Narrows Dam and reservoir, a non-Federal project to be located on... construction of the 17,000 acre-foot Narrows Dam and reservoir on Gooseberry Creek, pipelines to deliver the...

  17. Longitudinal cracking in concrete at bridge deck dams on structural rehabilitation projects.

    Science.gov (United States)

    2012-10-01

    The main objective of this project was to identify the causes of longitudinal cracking in newly placed concrete deck segments adjacent to : bridge deck expansion dam rehabilitations within District 3-0 of the Pennsylvania Department of Transportation...

  18. Environmental-impact assessment of dams and reservoir projects (review and a case study)

    International Nuclear Information System (INIS)

    Shah, S.M.

    2009-01-01

    Dams and reservoirs are among one of the most sensitive of all development Project, in terms of pervasiveness of their influence in altering the environmental conditions and resources. In the present study, major dams and reservoir projects are reviewed, from the environmental point of view. Dams and Reservoir projects bring about major changes in the immediate environment, thus affecting public health, settlements, farmlands, roads and historical sites. Impacts on human population and wildlife may be profound. Tropical diseases, involving fresh-water hosts or vectors in their transmission, are often common around new reservoirs. Large lakes create limnological changes, excessive evaporation, seepage, disturbance in water-table and increased tendencies of landslides and earthquakes. Micro climatic changes are possible, such as fog formation, increased cloudiness and modified rainfall-patterns. Retention of sediment results in silting up of reservoirs. Water shortages on mountain rivers may leave unsightly dry river-beds below a dam. Sediment deposition and growth of vegetation in reservoir affects the water-extraction for navigation power-generation and fishing. Various dams and reservoir projects in the world are critically studied, in terms of creating environmental impacts. The Kala Bagh Dam project (Pakistan), which is ready for construction, has been analysed as a case study, by matrix method. Analyses show that adverse effects of this dam are less than the benefits. It is recommended that based on the experience, appropriate lines and strategies may be drawn up to evaluate the local projects. Multidisciplinary experts need to be involved, for assessing environmental impacts and suggesting mitigation measures, to combat the adverse effects. (author)

  19. Survival Estimates for the Passage of Spring-Migrating Juvenile Salmonids through Snake and Columbia River Dams and Reservoirs, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Zabel, Richard; Williams, John G.; Smith, Steven G. (Northwest and Alaska Fisheries Science Center, Fish Ecology Division, Seattle, WA)

    2002-06-01

    In 2001, the National Marine Fisheries Service and the University of Washington completed the ninth year of a study to estimate survival and travel time of juvenile salmonids (Oncorhynchus spp.) passing through dams and reservoirs on the Snake and Columbia Rivers. All estimates were derived from passive integrated transponder (PIT)-tagged fish. We PIT tagged and released at Lower Granite Dam a total of 17,028 hatchery and 3,550 wild steelhead. In addition, we utilized fish PIT tagged by other agencies at traps and hatcheries upstream of the hydropower system and sites within the hydropower system. PIT-tagged smolts were detected at interrogation facilities at Lower Granite, Little Goose, Lower Monumental, McNary, John Day, and Bonneville Dams and in the PIT-tag detector trawl operated in the Columbia River estuary. Survival estimates were calculated using the Single-Release Model. Primary research objectives in 2001 were to: (1) estimate reach and project survival and travel time in the Snake and Columbia Rivers throughout the yearling chinook salmon and steelhead migrations; (2) evaluate relationships between survival estimates and migration conditions; and (3) evaluate the survival-estimation models under prevailing conditions. This report provides reach survival and travel time estimates for 2001 for PIT-tagged yearling chinook salmon and steelhead (hatchery and wild) in the Snake and Columbia Rivers. Results are reported primarily in the form of tables and figures with a minimum of text. More details on methodology and statistical models used are provided in previous reports cited in the text. Results for summer-migrating chinook salmon will be reported separately.

  20. Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008

    Energy Technology Data Exchange (ETDEWEB)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R. L.; Fu, Tao; Skalski, J. R.; Fischer, Eric S.

    2010-02-12

    Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam.

  1. Survival Estimates for the Passage of Juvenile Salmonids through Snake River Dams and Reservoirs, 1997 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hockersmith, Eric E.

    1999-03-01

    This report consists of two parts describing research activities completed during 1997 under Bonneville Power Administration Project Number 93-29. Part 1 provides reach survival and travel time estimates for 1997 for PIT-tagged hatchery steelhead and yearling chinook salmon in the Snake and Columbia Rivers. The results are reported primarily in the form of tables and figures with a minimum of text. More detailed information on methodology and the statistical models used in the analysis are provided in previous annual reports cited in the text. Analysis of the relationships among travel time, survival, and environmental factors for 1997 and previous years of the study will be reported elsewhere. Part 2 of this report describes research to determine areas of loss and delay for juvenile hatchery salmonids above Lower Granite Reservoir.

  2. Passage of American shad: paradigms and realities

    Science.gov (United States)

    Haro, Alex; Castro-Santos, Theodore

    2012-01-01

    Despite more than 250 years of development, the passage of American shad Alosa sapidissima at dams and other barriers frequently remains problematic. Few improvements in design based on knowledge of the swimming, schooling, and migratory behaviors of American shad have been incorporated into passage structures. Large-scale technical fishways designed for the passage of adult salmonids on the Columbia River have been presumed to have good performance for American shad but have never been rigorously evaluated for this species. Similar but smaller fishway designs on the East Coast frequently have poor performance. Provision of effective downstream passage for both juvenile and postspawning adult American shad has been given little consideration in most passage projects. Ways to attract and guide American shad to both fishway entrances and downstream bypasses remain marginally understood. The historical development of passage structures for American shad has resulted in assumptions and paradigms about American shad behavior and passage that are frequently unsubstantiated by supporting data or appropriate experimentation. We propose that many of these assumptions and paradigms are either unfounded or invalid and that significant improvements to American shad upstream and downstream passage can be made via a sequential program of behavioral experimentation, application of experimental results to the physical and hydraulic design of new structures, and controlled tests of large-scale prototype structures in the laboratory and field.

  3. 77 FR 24949 - Red River Lock & Dam No. 4 Hydroelectric Project; BOST4 Hydroelectric LLC; Notice of Proposed...

    Science.gov (United States)

    2012-04-26

    ... River Lock & Dam No. 4 Hydroelectric Project; BOST4 Hydroelectric LLC; Notice of Proposed Restricted... issuance of a license for the proposed Red River Lock & Dam No. 4 Hydroelectric Project No. 12757. The... staff proposes to draft in consultation with certain parties listed below. BOST4 Hydroelectric LLC, as...

  4. Lake Robertson hydroelectric project. Construction of a roller compacted concrete dam

    Energy Technology Data Exchange (ETDEWEB)

    Labelle, M.; Robitaille, F. [Hydro-Quebec, Montreal, PQ (Canada)

    1995-12-31

    Construction of the Lake Robertson hydroelectric project on Quebec`s Lower North Shore was discussed in detail. The dam and powerhouse, located on the HaHa River, consists of a 134 m long concrete gravity dam, and a 21 MW powerhouse with two 69 kV transmission lines and four substations. The climate, terrain, and geography of the region, all of them characterized as severe, and the logistics of construction of the dam and power lines, aggravated by the isolation and severe conditions at the site, were described. The roller compacted concrete design and construction were noted, and justification for a concrete dam over an earth-fill dam was provided. Economics, properties, and composition of the roller compacted concrete (RCC) were examined, and control test results for the RCC concrete were provided. The use of RCC for the Lake Robertson development was described as successful in terms of the quality, watertightness, and completion time. The experience gained by the participants will make it possible to offer RCC as an alternative on various other projects. 2 figs.

  5. Clackamas/Hood River Habitat Enhancement Program; Collawash River Falls Fish Passage Project, 1992 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Deibel, Robert H. (Mount Hood National Forest, Clackamas River Ranger District, Estacada, OR)

    1993-04-01

    The Forest Service conducted physical habitat and biological monitoring of the project area in 1992. The physical habitat monitoring included determining if the Forest Service needed to do additional channel work and also documenting how the channel changed at various flow events. There appeared to be little change in conditions at the site from 1991 to 1992. In the spring of 1992, summer steelhead were seen upstream of the falls area and one spring chinook salmon was observed in the first pool below the initial cascade. These results imply that the reduction in the number of cascades facilitates fish access through the area. The Forest Service plans to continue monitoring channel changes through time and also plans to continue to do biological monitoring of the upstream areas. Physical habitat monitoring will be conducted to determine if channel maintenance work is necessary to ensure that fish passage remains at the levels approximating conditions seen in 1991 and 1992.

  6. Research Design for the Chief Joseph Dam Cultural Resources Project.

    Science.gov (United States)

    1984-01-01

    questions regarding ethnographic reconstruction of Plateau culture: (1) what was the nature of * the early acculturation process on various Plateau groups...will be Incorporated into the summary report (Jaehnig and Campbell 1984d). In general, the project area region produces a varied supply of roots, berries ...collecting edible plants and other materials. The bases of rockfalls and talus slopes support a variety of shrubs valued for their berries . Serviceberries

  7. In situ investigation of the long-term sealing system as component of dam construction (Dam project)

    International Nuclear Information System (INIS)

    1995-01-01

    The project ''In situ investigation of the long term sealing system as a component of a Dam Construction'' started on April 1991. The main objectives of the research to be developed by DIT-UPC group is to model and validate the effects of multiphase flow through the components of the long-term seal and at the interface between the seal and the host rock. These include the following main tasks: -Task 1: State of the art-review -Task 2: Laboratory work -Task 3: Modelling -Task 4: Code verification -Task 5: Validation From these tasks, the main research directions that have been followed are: Constitutive modelling of the mechanical behaviour of porous salt aggregates. Development of a theoretical framework for the study and charaterization of the coupled hydro-thermo-mechanical behaviour of a porous/non-porous saline system. This includes both, establishing the governing equations and the adoption of constitutive laws. The final objective is the development of a numerical simulator able to handle problems in saline environments

  8. “Learning it the Hard Way”: Social safeguards norms in Chinese-led dam projects in Myanmar, Laos and Cambodia

    NARCIS (Netherlands)

    Kirchherr, Julian; Matthews, Nathanial; Charles, Katrina J.; Walton, Matthew J.

    Chinese dam developers claim to construct at least every second dam worldwide. However, scholarly literature comprehensively investigating the social safeguard norms in these projects is rare. This paper analyses social safeguard norms in Chinese-led dam projects in Myanmar, Laos and Cambodia,

  9. Hydroelectric development project of the Magpie dam on the Magpie River: Investigation and public hearing report

    International Nuclear Information System (INIS)

    Harvey, A.; Journault, C.

    2004-08-01

    Public hearings were held by Quebec's Bureau d'audiences publiques sur l'environnement (BAPE) concerning a proposed hydroelectric development project on the Magpie River in Quebec's Minganie Region. The proposed hydroelectric power plant is to be developed and managed by Hydromega Services Inc. and constructed by Aecon Group Ltd. The project consists of reconstructing a power plant and dam at an existing site that was constructed in 1961 but which has been decommissioned since 1989. The installed capacity of the proposed power plant is 40.6 MW. The drop height for the dam is 21.25 metres. The issues that were addressed during the hearings included the opinions and suggestion of the participants regarding energy provisions, regional development and ecological protection. One of the main concerns facing this project is the loss of spectacular rapids currently used by rafters. The Commission noted that the rapids cannot be saved without significant modification to the design of the project. However, the flooding associated with the project would facilitate fishermen, canoeists and kayakers, thereby preserving the recreational and tourism attributes of the Magpie River. The Commission also noted that the local economic repercussions of the project would benefit the population of the Minganie Region which has a high unemployment rate. Any ecological impacts may be controlled by relevant attenuation measures and follow-up. It was concluded that the proposed project could contribute modestly to meeting the anticipated growth in energy demand in Quebec. refs., figs

  10. Evaluation of the Three Gorges Dam project using multi-criteria analysis (MCA) based on a sustainable perspective

    Science.gov (United States)

    Han, Yue; Zheng, Wei; Guo, Junshan; Ma, Yihe; Ding, Junqi; Zhu, Lingkai; Che, Yongqiang; Zhang, Yanpeng

    2018-02-01

    Abstract . The Three Gorges dam of China is one of the largest and expensive hydropower projects of the world. The four main purposes of the project are flood control,energy production, improved navigation and fresh water supply. The dam project has been completed and running successfully with the potential benefits. However, this project is still a controversial issue among many environmentalists and socialists due to various impacts. This study focuses on the benefit and the impacts of the project, and also evaluates the performance of the project using multi-criteria analysis (MCA) approach from a sustainable perspective. Different sustainability criteria related with the dam project have been identified and used for the ranking and rating process. The final result of MCA comes with this scoring process and pairwise comparison, which evaluates the performance of the project considering different positive and negative aspects.

  11. HE POWER STRUGGLE IN THE LAYER OF TRANSNATIONAL HYDROPOLITICS: THE CASE OF THE ILISU DAM PROJECT

    Directory of Open Access Journals (Sweden)

    Ahmet Conker

    2016-11-01

    Full Text Available The study analyses hydropolitical relations among state and non-state actors in the context of the layer of transnational hydropolitics by looking at the controversy over the construction of the Ilisu dam project. Turkey is fully engaged in its „hydraulic mission‟, very extensively and rapidly „developing‟ water resources throughout its territory. Some of these flows cross international borders, specifically very heavily contested Euphrates and Tigris basin. This large basin has attracted considerable academic attention, notably in regards to Turkey‟s relations with downstream neighbours, Syria and Iraq. Yet, the great bulk of the existing analysis falls prey to two broader weaknesses; a it has narrowly applied the recently developed literature regarding the role of power in transboundary water politics, and b it has neglected or under-emphasized how non-state actors enrol in hydropolitical processes. Informed by deep investigation of the case study regarding the recent controversy over the construction of the Ilisu dam on the Tigris River, the study proposes a conceptual framework that seeks to analyse how power dynamics are at work at different scales of hydropolitics other than inter-state relations between the riparian states and how both discursive and material power capabilities influence the outcome of interactions as well as conflictual and cooperative relations between the state and non-state actors. The application of the conceptual framework to the relations between opponents and proponents of the construction of the Ilisu dam project shows how power dynamics change over time and they strongly shape conflictual relations between the actors. By highlighting the influence of the transnational anti-dam activist networks, the study shows the relevance of including non-state actors into analysis. The study shows that such actors lack material power but are able to use discursive (ideational and bargaining power very effectively

  12. Landsat Image Analysis of the Rebea Agricultural Project, Mosul Dam and Lake, Northern Iraq

    Science.gov (United States)

    Welsh, W.; Alassadi, F.

    2014-12-01

    An archive of 70 good-to-excellent quality Landsat TM and ETM+ images acquired between 1984 and 2011 were identified through visual examination of the GLOVIS web portal. After careful consideration of factors relevant to agriculture in the region (e.g., crop calendar) and associated image processing needs (e.g., preference for anniversary dates), the images deemed most appropriate were downloaded. Standard preprocessing, including visual quality and statistical inspection, sub-setting to the study area, was performed, and the results combined in a database with available GIS data. The resolution merge spatial enhancement technique was applied to any ETM+ imagery to improve visual clarity and interpretability. The NDVI was calculated for all images in the time series. Unsupervised classification of images was performed for dates ranging from 1987 just before the inception of the Rebea project in 1989 through 2011. In order to reduce uncertainty related to lack of detailed ancillary and/or ground reference data, simple land cover classes were mapped, specifically: surface water, agriculture, and other. Results were able to quantify and track areas of each class over time, and showed a marked decrease in agriculture between the Iraq invasion in 2003 to the end of the study period in 2011, despite massive efforts and capital by the United States and Iraqi governments to improve agriculture in the area. Complications to understanding the role of warfare and conflict on the environment in the Mosul region include severe drought and water shortages, including effects of the Turkish GAP water resource development project in the headwaters of the Tigris-Euphrates, as well as Mosul Dam structural problems associated with geologically-unsuitable conditions upon which the dam is constructed. Now, the Islamic State in Iraq and Syria (ISIS) likely captured the Mosul Dam on the day this abstract was submitted. Our Landsat-based monitoring and analysis of the Rebea Project and

  13. Evaluation of Dual Frequency Identification Sonar (DIDSON) for Monitoring Pacific Lamprey Passage at Fishways of Bonneville and John Day Dams, 2012

    Science.gov (United States)

    2013-01-01

    Methods The DIDSON camera was developed by the University of Washington’s Applied Physics Laboratory (Belcher et al. 1999, 2001; Tiffan et al...waves to monitor fish entrainment. Hydro Review. 10(4). Ransom, B. H., and T. W. Steig. 1994. Using hydroacoustics to monitor fish at hydropower...dams. Lake and Reservoir Management 9(1):163-169. Ransom, B. H., T. W. Steig, and P. A. Nealson. 1996. Comparison of hydroacoustic and net catch

  14. White River Falls Fish Passage Project, Tygh Valley, Oregon : Final Technical Report, Volume I..

    Energy Technology Data Exchange (ETDEWEB)

    Oregon. Dept. of Fish and Wildlife; Mount Hood National Forest (Or.)

    1985-06-01

    Studies were conducted to describe current habitat conditions in the White River basin above White River Falls and to evaluate the potential to produce anadromous fish. An inventory of spawning and rearing habitats, irrigation diversions, and enhancement opportunities for anadromous fish in the White River drainage was conducted. Survival of juvenile fish at White River Falls was estimated by releasing juvenile chinook and steelhead above the falls during high and low flow periods and recapturing them below the falls in 1983 and 1984. Four alternatives to provide upstream passage for adult salmon and steelhead were developed to a predesign level. The cost of adult passage and the estimated run size of anadromous fish were used to determine the benefit/cost ratio of the preferred alternative. Possible effects of the introduction of anadromous fish on resident fish and on nearby Oak Springs Hatchery were evaluated. This included an inventory of resident species, a genetic study of native rainbow, and the identification of fish diseases in the basin. 28 figs., 23 tabs.

  15. “Learning it the Hard Way”: Social safeguards norms in Chinese-led dam projects in Myanmar, Laos and Cambodia

    International Nuclear Information System (INIS)

    Kirchherr, Julian; Matthews, Nathanial; Charles, Katrina J.; Walton, Matthew J.

    2017-01-01

    Chinese dam developers claim to construct at least every second dam worldwide. However, scholarly literature comprehensively investigating the social safeguard norms in these projects is rare. This paper analyses social safeguard norms in Chinese-led dam projects in Myanmar, Laos and Cambodia, hotspots of Chinese-led dam construction. We find that social safeguard norms adopted have significantly changed in the past 15 years. While Chinese dam developers claimed to adopt standards of the host countries upon the launch of China's Going Out Policy in 2001, with occasional adoption of more demanding Chinese standards, they did not adopt international norms. In recent years, however, they increasingly take into account international norms. We argue that the root cause for this change is social mobilization, with the suspension of the Myitsone Dam in 2011 as a particular game changer. Enhanced social safeguard legislation in host countries and China, stricter rules of Chinese funders and cooperation of Chinese dam developers with international players have also facilitated this change. - Highlights: • Very first regional case study on social safeguard norms in Chinese-led dam projects in Myanmar, Laos and Cambodia. • Found that Chinese dam developers increasingly take into account international social safeguards norms. • Root cause is social mobilization, with the suspension of the Myitsone Dam in 2011 as a particular game changer.

  16. Wildlife Impact Assessment and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Volume One, Libby Dam Project, Operator, U.S. Army Corps of Engineers.

    Energy Technology Data Exchange (ETDEWEB)

    Yde, Chris A.

    1984-10-01

    This assessment addresses the impacts to the wildlife populations and wildlife habitats due to the Libby Dam project on the Kootenai River and previous mitigation of these losses. The current assessment documents the best available information concerning the impacts to the wildlife populations inhabiting the project area prior to construction of the dam and creation of the reservoir. Many of the impacts reported in this assessment differ from those contained in the earlier document compiled by the Fish and Wildlife Service; however, this document is a thorough compilation of the available data (habitat and wildlife) and, though conservative, attempts to realistically assess the impacts related to the Libby Dam project. Where appropriate the impacts resulting from highway construction and railroad relocation were included in the assessment. This was consistent with the previous assessments.

  17. American Recovery and Reinvestment Act: North Fork Skokomish Powerhouse at Cushman No. 2 Dam

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, Steve [DBA Tacoma Power, WA (United States); McCarty, Patrick [DBA Tacoma Power, WA (United States)

    2013-09-30

    The objective of this project was to add generating capacity on an in-stream flow release at Tacoma Power's Cushman hydroelectric project, Cushman No. 2 Dam, FERC Project P-460. The flow that is being used to generate additional electricity was being discharged from a valve at the base of the dam without recovery of the energy. A second objective to the project was to incorporate upstream fish passage by use of a fish collection structure attached to the draft tubes of the hydroelectric units. This will enable reintroduction of native anadromous fish above the dams which have blocked fish passage since the late 1920's. The project was funded in part by the American Recovery and Reinvestment Act through the Department of Energy, Office of Energy, Efficiency and Renewable Energy, Wind and Water Power Program.

  18. Dams and river dolphins: Can they co-exist?

    International Nuclear Information System (INIS)

    Reeves, R.R.; Leatherwood, S.

    1994-01-01

    Dam construction is one of many ways that humans have modified river-dolphin habitats. It is suggested that physiographic and hydrologic complexity plays an important role in making rivers suitable for dolphins. If this hypothesis is true, then it can be assumed that dams and other artificial obstructions degrade dolphin habitat insofar as they reduce such complexity. This paper identifies some of the impacts that dams, barrages, and dikes might have on dolphins. Research is needed at project sites, both before and after construction, to document impacts. Specially designed ''swimways'' may allow upstream and downstream passage by dolphins and thus mitigate at least one of the adverse effects of dam projects, namely population fragmentation, but such measures aimed at benefiting single species are no substitute for protecting ecosystems. 30 refs

  19. Impact of the Three-Gorges Dam and water transfer project on Changjiang floods

    Science.gov (United States)

    Nakayama, Tadanobu; Shankman, David

    2013-01-01

    Increasing frequency of severe floods on the middle and lower Changjiang (Yangtze) River during the past few decades can be attributed to both abnormal monsoon rainfall and landscape changes that include extensive deforestation affecting river sedimentation, and shrinking lakes and levee construction that reduced the areas available for floodwater storage. The Three-Gorges Dam (TGD) and the South-to-North Water Transfer Project (SNWTP) will also affect frequency and intensity of severe floods in the Poyang Lake region of the middle Changjiang. Process-based National Integrated Catchment-based Eco-hydrology (NICE) model predicts that the TGD will increase flood risk during the early summer monsoon against the original justifications for building the dam, relating to complex river-lake-groundwater interactions. Several scenarios predict that morphological change will increase flood risk around the lake. This indicates the importance of managing both flood discharge and sediment deposition for the entire basin. Further, the authors assessed the impact of sand mining in the lake after its prohibition on the Changjiang, and clarified that alternative scenario of sand mining in lakes currently disconnected from the mainstream would reduce the flood risk to a greater extent than intensive dredging along junction channel. Because dry biomasses simulated by the model were linearly related to the Time-Integrated Normalized Difference Vegetation Index (TINDVI) estimated from satellite images, its decadal gradient during 1982-1999 showed a spatially heterogeneous distribution and generally decreasing trends beside the lakes, indicating that the increases in lake reclamation and the resultant decrease in rice productivity are closely related to the hydrologic changes. This integrated approach could help to minimize flood damage and promote better decisions addressing sustainable development.

  20. Tailoring dam structures to water quality predictions in new reservoir projects: assisting decision-making using numerical modeling.

    Science.gov (United States)

    Marcé, Rafael; Moreno-Ostos, Enrique; García-Barcina, José Ma; Armengol, Joan

    2010-06-01

    Selection of reservoir location, the floodable basin forest handling, and the design of dam structures devoted to water supply (e.g. water outlets) constitute relevant features which strongly determine water quality and frequently demand management strategies to be adopted. Although these crucial aspects should be carefully examined during dam design before construction, currently the development of ad hoc limnological studies tailoring dam location and dam structures to the water quality characteristics expected in the future reservoir is not typical practice. In this study, we use numerical simulation to assist on the design of a new dam project in Spain with the aim of maximizing the quality of the water supplied by the future reservoir. First, we ran a well-known coupled hydrodynamic and biogeochemical dynamic numerical model (DYRESM-CAEDYM) to simulate the potential development of anoxic layers in the future reservoir. Then, we generated several scenarios corresponding to different potential hydraulic conditions and outlet configurations. Second, we built a simplified numerical model to simulate the development of the hypolimnetic oxygen content during the maturation stage after the first reservoir filling, taking into consideration the degradation of the terrestrial organic matter flooded and the adoption of different forest handling scenarios. Results are discussed in terms of reservoir design and water quality management. The combination of hypolimnetic withdrawal from two deep outlets and the removal of all the valuable terrestrial vegetal biomass before flooding resulted in the best water quality scenario. (c) 2010 Elsevier Ltd. All rights reserved.

  1. Final Independent External Peer Review Report for the Intake Diversion Dam Modification Lower Yellowstone Project, Montana Draft Supplement to the 26 April 2010 Environmental Assessment and Appendices

    Science.gov (United States)

    2013-02-08

    drop structures, embankments, and low-head dams for water diversion and flood control, including flood control projects in Contra Costa and Napa... counties , California. He has been a principal consultant on more than 150 small, earth-fill dams and reservoirs for the Vineyard Development Water...Intake Diversion Dam is located along the Lower Yellowstone River, approximately 18 miles downstream from the City of Glendive, Dawson County

  2. Multi-causal pathways of public opposition to dam projects in Asia: A fuzzy set qualitative comparative analysis (fsQCA)

    NARCIS (Netherlands)

    Kirchherr, Julian; Charles, Katrina J.; Walton, Matthew J.

    2016-01-01

    Scholars overwhelmingly adopt the case study method when analyzing causal conditions inducing anti-dam-protests. We have carried out the first medium-N-study on this topic analyzing public opposition to 12 dam projects in Asia. For this purpose, we employ a fuzzy-set Qualitative Comparative Analysis

  3. Mechanics of slide dams

    International Nuclear Information System (INIS)

    Young, G.A.

    1970-01-01

    Studies which promote the use of nuclear energy for peaceful projects in engineering are sponsored by the Atomic Energy Commission under the Plowshare program. Specific projects being considered include the construction of harbors, canals, and dams. Of these projects, perhaps the most difficult to accomplish will be the latter. This paper which is in two parts considers the problems which are associated with the construction of slide dams with nuclear explosives. It examines first the characteristics of conventional earth and rock-fill dams which are based upon proven techniques developed after many years of experience. The characteristics of natural landslide dams are also briefly considered to identify potential problems that must be overcome by slide dam construction techniques. Second, the mechanics of slide dams as determined from small-scale laboratory studies are presented. It is concluded that slide dams can be constructed and that small-scale field tests and additional laboratory studies are justified. (author)

  4. Selection of maximum design earthquake parameters for a dam safety project in British Columbia

    International Nuclear Information System (INIS)

    Smith, H.R.; Wightman, A.; Naumann, C.M.

    1991-01-01

    A study was carried out for the Greater Vancouver Water District to determine maximum design earthquake (MDE) parameters for dam safety projects. Three types of maximum credible earthquake (MCE) were investigated: a mega thrust earthquake (interplate event) of magnitude 9 on the Richter scale under the west coast of Vancouver Island; a magnitude 7.5 earthquake (intraplate event) under Georgia Straight at a depth of ca 60 km; and a local magnitude 6.5 shallow earthquake near the study site, on the north shore mountains near Vancouver. Conclusions of the study include the following. Strong motion records are recorded on three component accelerograms, and considering the individual components rather than the maximum ground motion can result in underestimation of seismic loading. It is recommended that the peak ground motions be defined by the envelope of the larger component, which would include peak ground acceleration, peak velocity and response spectra. The peak ground acceleration of the most critical earthquake, of magnitude 6.5 at 10 km, was estimated at 0.5 gravities. A variety of check methodologies yielded peak horizontal ground acceleration (PGA) ranging from 0.44 to 0.55 gravities. PGA values chosen for seismic analysis must consider duration and direction of peak as well as type of analysis, failure mode and material types. 9 refs., 10 figs., 2 tabs

  5. Wildlife Mitigation and Restoration for Grand Coulee Dam: Blue Creek Project, Phase 1.

    Energy Technology Data Exchange (ETDEWEB)

    Merker, Christopher

    1993-04-01

    This report is a recommendation from the Spokane Tribe to the Northwest Power Planning Council (NPPC) for partial mitigation for the extensive wildlife and wildlife habitat losses on the Spokane Indian Reservation caused by the construction of Grand Coulee Dam. NPPC`s interim wildlife goal over the next 7 years for the Columbia hydropower system, is to protect, mitigate and enhance approximately 35% basin wide of the lost habitat units. Grand Coulee Dam had the greatest habitat losses of any Dams of the Wildlife Rule.

  6. EXPLORING THE POLITICS OF LOCAL PARTICIPATION IN RURAL DEVELOPMENT PROJECTS: SMALL DAMS REHABILITATION PROJECT IN ZIMBABWE

    Directory of Open Access Journals (Sweden)

    Jacob Tagarirofa

    2013-02-01

    Full Text Available The study sought to evaluate the effectiveness of community participation in rural development projects in Zimbabwe testing the credibility of the popularized supposition that almost all contemporary development efforts characteristically embrace local participation. Public participation is widely assumed to be an essential ingredient for the fruition of rural development efforts. The research made use of quantitative and qualitative research methodologies in which unstructured interviews, focus group discussions and questionnaires were used as data gathering instruments. The analysis of data was enabled by the use of People-Centered Development (PCD as a conceptual framework. Findings revealed that the level of community participation in the district is not only minimal, but it is also top down. This has much to do with the negative perceptions by facilitating agents viewing local people as passive recipients of externally crafted models of development and other factors such as the power dynamics within and between the community and other stakeholders. The research also found preferential treatment of other tribal groups by the facilitating agent, intra group conflicts and bureaucratic and political influence as obstacles militating against effective participation. Based on these findings, and consistent with the wider literature, recommendation are that the nature of community engagement should be based on the principle of equal partnership among all stakeholders as this would encourage full cooperation and thus effective participation.

  7. Marib Dam: the importance of environmental and health impact studies for development projects.

    Science.gov (United States)

    Basahi, I A

    2000-01-01

    Marib Dam was built without an environmental impact assessment study which created many conflicts. In 1995 and 1996 its impact on water quality, agriculture and groundwater recharge and socioeconomics was studied. Lake water could suffer severe eutrophication when floods are weak and algae growth is not controlled. Introducing Tilapia nilotica provided biological control of algae growth. The dam positively affected agriculture and groundwater within the designed irrigation scheme but negatively affected them beyond it. The dam also negatively affected health conditions and increased conflicts over water distribution. It positively affected women by allowing them to work in agriculture and participate in decision-making. The dam raised income levels of farmers and encouraged tourism.

  8. Participation with a Punch: Community Referenda on Dam Projects and the Right to Free, Prior, and Informed Consent to Development

    Directory of Open Access Journals (Sweden)

    Brant McGee

    2010-06-01

    Full Text Available The 2000 Report of the World Commission on Dams (WCD found that dams can threaten the resources that provide the basis for indigenous and other peoples’ culture, religion, subsistence, social and family structure – and their very existence, through forced relocation – and lead to ecosystem impacts harmful to agriculture, animals and fish. The WCD recommended the effective participation of potentially impacted local people in decisions regarding dam construction. The international right to free, prior, and informed consent (FPIC accorded to indigenous peoples promises not only the opportunity to participate in decisions affecting their lands and livelihoods but to stop unwanted development by refusing consent as well. The newly developed concept of community referenda, held in areas potentially impacted by development projects, provides an accurate measure of the position of local voters on the proposed project through a democratic process that discourages violence, promotes fair and informed debate, and provides an avenue for communities to express their consent or refusal of a specific project. The legal basis, practical and political implications, and Latin American examples of community referenda are explored as a means of implementing the critical goal of the principle of FPIC, the expression of community will and its conclusive impact on development decision-making.

  9. Differential impacts of an irrigation project : case study of the Swar Dam Project in Yedashe, Bago region of Myanmar

    OpenAIRE

    Oo, Aung Tun; Van Huylenbroeck, Guido; Speelman, Stijn

    2017-01-01

    In Myanmar, the government has made a vast investment in the construction of dams to improve crop productivity and to ensure socioeconomic development. This study explores the differential impacts, in terms of socioeconomic conditions, of these investments for paddy farmers in Yedashe Township, in the Bago region in the south-central part of Myanmar. A farm survey among 95 respondents is used to compare the situation before and after the construction of a dam. It is observed that after the in...

  10. Walla Walla River Fish Passage Operations Program, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR); Duke, Bill B. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2006-02-01

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2004-2005 project year, there were 590 adult summer steelhead, 31 summer steelhead kelts (Oncorhynchus mykiss), 70 adult bull trout (Salvelinus confluentus); 80 adult and 1 jack spring Chinook (O. tshawytscha) enumerated at the Nursery Bridge Dam fishway video counting window between December 13, 2004, and June 16, 2005. Summer steelhead and spring chinook were observed moving upstream while bull trout were observed moving both upstream and downstream of the facility. In addition, the old ladder trap was operated by ODFW in order to enumerate fish passage. Of the total, 143 adult summer steelhead and 15 summer steelhead kelts were enumerated at the west ladder at Nursery Bridge Dam during the video efforts between February 4 and May 23, 2005. Operation of the Little Walla Walla River

  11. The negative effects of development megaprojects: Comparative study of four cases of population relocation related to dam projects

    International Nuclear Information System (INIS)

    D'Almeida, K.

    1993-11-01

    As with any other hydroelectric installation project around the world, the construction of large dams in Africa such as the Kariba in Zambia, the Aswan High Dam in Egypt, the Akossombo in Ghana, and the Kossou in Ivory Coast have caused massive displacements of populations. Parallel to the attendant positive effects, negative effects have been observed following the relocation of those populations. These negative effects are social, cultural, political, economic, sanitary, demographic, psychological, and ecological. A comparative study is conducted of the four cases of dam construction cited above in order to demonstrate that errors committed by planners were at the source of those negative effects of population displacement. The knowledge of those errors committed in the past should serve as lessons for future instances of population relocation. Such lessons are outlined in the areas of relocation planning, principles of indemnization, re-housing of populations on new sites, and adaptation of the populations to new agricultural techniques. 116 refs., 14 figs., 5 tabs

  12. Walla Walla River Fish Passage Operations Program, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR); Duke, Bill B. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2004-03-01

    In the late 1990's, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and initiating trap and haul efforts. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2002-2003 project year, there were 545 adult summer steelhead (Oncorhynchus mykiss), 29 adult bull trout (Salvelinus confluentus); 1 adult and 1 jack spring chinook (O. tshawytscha) enumerated at the Nursery Bridge Dam fishway adult trap between January 1 and June 23, 2003. Summer steelhead and spring chinook were observed moving upstream while bull trout were observed moving both upstream and downstream of the facility. Operation of the Little Walla Walla River juvenile trap for trap and haul purposes was not necessary this year. The project transported 21 adult spring chinook from Ringold Springs Hatchery and 281 from Threemile Dam to the South Fork Walla Walla Brood Holding Facility. Of these, 290 were outplanted in August for natural spawning in the basin.

  13. Analysis of Environmental Issues Related to Small-Scale Hydroelectric Development II: Design Consideration for Passing Fish Upstream Around Dams

    Energy Technology Data Exchange (ETDEWEB)

    Hildebrandt, S. G. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bell, M. C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Anderson, J. J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Richey, E. P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Parkhurst, Z. E. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    1980-08-01

    The purpose of this report is to provide general information for use by potential developers of small scale hydroelectric projects that will include facilities to pass migrating fish upstream around dams. The document is not intended to be a textbook on design of fish passage facilities, but rather to be a general guide to some factors that are important when designing such facilities.

  14. Economic Efficiency and Equity in Dams Removal: Case studies in Northeastern Massachusetts Doina Oglavie, Ellen Douglas, David Terkla

    Science.gov (United States)

    Oglavie, D. R.; Douglas, E. M.; Terkla, D.

    2009-12-01

    identified externalities. Economic efficiency occurs when the greatest total social value is obtained for the least possible social cost. Equity is related to the fair and just distribution of benefits and costs among individuals and society. Our first evaluation looked at the decisions made with respect to two dams situated on the Ipswich River in northeastern Massachusetts: Bostik Dam and EBSCO Dam. The Bostik Dam provides water storage for nearby industrial facilities. It is the third dam on the main stem of the Ipswich River and is the most downstream dam without provisions for fish passage. The EBSCO Dam is the most downstream dam on the Ipswich River and presently has no functional use. After several meetings between owners, residents, and agencies involved in the process, the final decision was to remove the Bostik Dam. However, our preliminary analysis indicated that it would be more economically efficient and equitable to remove the EBSCO Dam instead. The next step in our project will be refine our economical analysis of these dams and apply our methods to other dams slated for removal in northeastern Massachusetts.

  15. Secular changes in the tidal constituents in San Francisco Bay originated by the California Gold Rush and major dam-building projects

    Science.gov (United States)

    Rodríguez, I.; Ortiz, M.

    2015-12-01

    Hourly sea-level records for the time period of 1901 to 2012 at Fort Point tidal station in San Francisco Bay are analyzed in an attempt to find the origin of the secular changes found in the tidal constituents. Complex demodulation implemented with a low pass filter window of 8760 hours was employed to extract the amplitude and phase of the principal tidal constituent M2 as a function of time. The 18.6 year nodal signal was removed by using the tide potential of the equilibrium tide. The results show significant trends up to 4 cm in amplitude as well as phase shifts of 17 minutes per century. Moreover, yearly amplitude variations of M2 show to be inversely correlated to river flow discharge. On the other hand, the results of a simplified two-layer numerical hydrodynamic model indicate that long-term tide variations are directly related to the morphological evolution of a sandbank located outside the bay surrounding its entrance, acting as a hydraulic control for the whole bay. According to historical results, the sandbank reached its shallowest depth during the California Gold Rush (1848-1884), when mining debris together with large amounts of sediment were deposited into the estuary. After the Central Valley Water Project was approved (1933), many dams were built decreasing significantly the sediment supply. With the passage of time, the gradual loss of sedimentation also diminished the sandbank, increasing its depth. This fact explains the observed secular long-term advance of the tidal phase, as well as the increasing trend of the M2 amplitude.

  16. Fish Passage Center 2001 annual report.; ANNUAL

    International Nuclear Information System (INIS)

    Fish Passage Center

    2002-01-01

    Extremely poor water conditions within the Columbia River Basin along with extraordinary power market conditions created an exceptionally poor migration year for juvenile salmon and steelhead. Monthly 2001 precipitation at the Columbia above Grand Coulee, the Snake River above Ice Harbor, and the Columbia River above The Dalles was approximately 70% of average. As a result the 2001 January-July runoff volume at The Dalles was the second lowest in Columbia River recorded history. As a compounding factor to the near record low flows in 2001, California energy deregulation and the resulting volatile power market created a financial crisis for the Bonneville Power Administration (BPA). Power emergencies were first declared in the summer and winter of 2000 for brief periods of time. In February of 2001, and on April 3, the BPA declared a ''power emergency'' and suspended many of the Endangered Species Act (ESA) and Biological Opinion (Opinion) measures that addressed mainstem Columbia and Snake Rivers juvenile fish passage. The river and reservoir system was operated primarily for power generation. Power generation requirements in January through March coincidentally provided emergence and rearing flows for the Ives-Pierce Islands spawning area below Bonneville Dam. In particular, flow and spill measures to protect juvenile downstream migrant salmon and steelhead were nearly totally suspended. Spring and summer flows were below the Opinion migration target at all sites. Maximum smolt transportation was implemented instead of the Opinion in-river juvenile passage measures. On May 16, the BPA Administrator decided to implement a limited spill for fish passage at Bonneville and The Dalles dams. On May 25, a limited spill program was added at McNary and John Day dams. Spill extended to July 15. Juvenile migrants, which passed McNary Dam after May 21, experienced a noticeable, improved survival, as a benefit of spill at John Day Dam. The suspension of Biological Opinion

  17. Monitoring and Evaluation of Yearling Fall Chinook Salmon Released from Acclimation Facilities Upstream of Lower Granite Dam; 1998 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Rocklage, Stephen J. (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

    2004-01-01

    The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery (Snake River stock) yearling fall chinook salmon that were acclimated and released at three Fall Chinook Acclimation Project sites upstream of Lower Granite Dam along with yearlings released on-station from Lyons Ferry Hatchery in 1998. The three fall chinook acclimation facilities are operated by the Nez Perce Tribe and located at Pittsburg Landing and Captain John Rapids on the Snake River and at Big Canyon Creek on the Clearwater River. Yearlings at the Big Canyon facility consisted of two size classes that are referred to in this report as 9.5 fish per pound (fpp) and 30 fpp. The Big Canyon 9.5 fpp were comparable to the yearlings at Pittsburg Landing, Captain John Rapids and Lyons Ferry Hatchery. A total of 9,942 yearlings were PIT tagged and released at Pittsburg Landing. PIT tagged yearlings had a mean fork length of 159.9 mm and mean condition factor of 1.19. Of the 9,942 PIT tagged fish released, a total of 6,836 unique tags were detected at mainstem Snake and Columbia River dams (Lower Granite, Little Goose, Lower Monumental and McNary). A total of 4,926 9.5 fpp and 2,532 30 fpp yearlings were PIT tagged and released at Big Canyon. PIT tagged 9.5 fpp yearlings had a mean fork length of 156.9 mm and mean condition factor of 1.13. PIT tagged 30 fpp yearlings had a mean fork length of 113.1 mm and mean condition factor of 1.18. Of the 4,926 PIT tagged 9.5 fpp yearlings released, a total of 3,042 unique tags were detected at mainstem Snake and Columbia River dams. Of the 2,532 PIT tagged 30 fpp yearlings released, a total of 1,130 unique tags were detected at mainstem Snake and Columbia River dams. A total of 1,253 yearlings were PIT tagged and released at Captain John Rapids. PIT tagged yearlings had a mean fork length of 147.5 mm and mean condition factor of 1.09. Of

  18. Proceedings of a workshop on American Eel passage technologies

    Science.gov (United States)

    Haro, Alexander J.

    2013-01-01

    Recent concerns regarding a decline in recruitment of American eels (Anguilla rostrata) have prompted efforts to restore this species to historic habitats by providing passage for both upstream migrant juveniles and downstream migrant adults at riverine barriers, including low-head and hydroelectric dams (Castonguay et al. 1994, Haro et al. 2000). These efforts include development of management plans and stock assessment reviews in both the US and Canada (COSEWIC 2006, Canadian Eel Working Group 2009, DFO 2010, MacGregor et al. 2010, ASMFC 2000, ASMFC 2006, ASMFC 2008, Williams and Threader 2007), which target improvement of upstream and downstream passage for eels, as well as identification and prioritization of research needs for development of new and more effective passage technologies for American eels. Traditional upstream fish passage structures, such as fishways and fish lifts, are often ineffective passing juvenile eels, and specialized passage structures for this species are needed. Although designs for such passage structures are available and diverse (Knights and White 1998, Porcher 2002, FAO/DVWK 2002, Solomon and Beach 2004a,b, Environment Agency UK 2011), many biologists, managers, and engineers are unfamiliar with eel pass design and operation, or unaware of the technical options available for upstream eel passage, Better coordination is needed to account for eel passage requirements during restoration efforts for other diadromous fish species. Also, appropriately siting eel passes at hydropower projects is critical, and siting can be difficult and complex due to physical restrictions in access to points of natural concentrations of eels, dynamic hydraulics of tailrace areas, and presence of significant competing flows from turbine outfalls or spill. As a result, some constructed eel passes are sited poorly and may pass only a fraction of the number of eels attempting to pass the barrier. When sited and constructed appropriately, however, eel passes

  19. Fish Passage Center 2007 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    DeHart, Michele [Fish Passage Center of the Columbia Basin Fish & Wildlife Authority

    2008-11-25

    and McNary dams), whereas prior to 2005 spill was terminated at these projects after the spring period. In addition, the 2007 operations agreement provided regardless of flow conditions. For the first time spill for fish passage was provided in the low flow conditions that prevailed in the Snake River throughout the spring and summer migration periods. Gas bubble trauma (GBT) monitoring continued throughout the spill period. A higher incidence of rank 1, GBT signs were observed in late arriving steelhead smolts arriving after the 95% passage date had occurred. During this time dissolved gas levels were generally below the 110% water quality standard in the forebay where fish were sampled. This occurrence was due to prolonged exposure and extended travel times due to low migration flows. The 2007 migration conditions differed from any year in the historic record. The migration conditions combined low river flows in the Snake River with spill throughout the spring and summer season. The juvenile migration characteristics observed in 2007 were unique compared to past years in that high levels of 24 hour spill for fish passage were provided in low flow conditions, and with a delayed start to the smolt transportation program a smaller proportion of the total run being transported. This resulted in relatively high spring juvenile survival despite the lower flows. The seasonal spring average flow in the Snake River was 61 Kcfs much lower than the spring time average of 120 Kcfs that occurred in 2006. However juvenile steelhead survival through the Lower Granite to McNary reach in 2007 was nearly 70% which was similar to the juvenile steelhead survival seen in 2006 under higher migration flows. The low flows in the May-July period of 2007 were similar to the 2001 low flow year, yet survival for fall chinook juveniles in this period in 2007 was much higher. In 2001 the reach survival estimate for juvenile fall Chinook from Lower Granite to McNary Dam ranged from 0

  20. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    DeHart, Michele (Columbia Basin Fish and Wildlife Authority, Fish Passage Center, Portland, OR)

    2004-09-01

    The runoff volumes in 2003 were below average for the January to July period above Lower Granite Dam (79%) and The Dalles Dam (82%). The year 2003 hydrosystem operations and runoff conditions resulted in flows that met the spring seasonal Biological Opinion flow objectives at Lower Granite Dam, McNary Dam and Priest Rapids Dam. However, summer seasonal flows at Lower Granite Dam and McNary Dam were considerably below the Biological Opinion objectives of 50.7 Kcfs at Lower Granite Dam and 2000 Kcfs at McNary Dam. Actual summer seasonal flows were just 32.3 Kcfs and 135.5 Kcfs, respectively. In most instances spill was provided as described by the Biological Opinion program for fish passage, within the constraints of the State waivers for total dissolved gas supersaturation levels. Spill was altered during spill testing and most notably during the month of August at Ice Harbor dam. At this project spill was modified from a 24-hour program to a 12-hour nightly spill period pending the evaluation of studies being conducted in-season. Spill was not returned to full implementation of the Biological Opinion levels even after data showed that spillway passage had the highest associated fish survival. This experience demonstrated the difficulty of managing the hydrosystem for fish passage based on preliminary data and data collected in-season. Increased hatchery releases and higher wild fish production resulted in a population of yearling chinook at Lower Granite Dam being one of the highest observed in recent years. However, the increased hatchery production may have been offset to some extent by decreased survival from release to Lower Granite Dam as suggested by the lower than average survival observed for the PIT tagged trap released fish to Lower Monumental Dam. Travel times were also longer for hatchery spring chinook compared to recent past years. The short duration of high flows that occurred in the Lower Snake River was too late for yearling chinook, but likely was

  1. MALACOLOGICAL INVESTIGATION OF THE FULLY OPERATIONAL NAM THEUN 2 HYDROELECTRIC DAM PROJECT IN KHAMMOUANE PROVINCE, CENTRAL LAO PDR.

    Science.gov (United States)

    Sri-aroon, Pusadee; Chusongsang, Phiraphol; Chusongsang, Yupa; Limpanont, Yanin; Surinthwong, Pornpimol; Vongphayloth, Khamsing; Brey, Paul T

    2015-09-01

    We conducted a malacological investigation in four districts of the Nam Theun 2 (NT2) hydroelectric dam project area, Khammouane Province, central Lao PDR (Nakai, Gnommalath, Mahaxai and Xe Bang Fai), after the first and second years of full operation in March 2010 and November 2011 to determine health risks for humans. A total 10,863 snail specimens (10 families/23 species) from 57 sampling stations and 12,902 snail specimens (eight families/21 species) from 66 sampling stations were collected in 2010 and 2011, respectively. Neotricula aperta (gamma race), the intermediate host for Schistosoma mekongi, was found in large numbers (5,853 specimens) in 2010 in Nam Gnom (downstream) at Station 25 (Mueang Gnommalath: Gnommalath District) and in fewer numbers (170 specimens) at Station 26 (Ban Thathod: Gnommalath District). In 2011, significantly fewer numbers (434 specimens) of N. aperta were found at Station 25. No snails were found to be infected with S. mekongi; however, 3.6% and 0.45% of Bithynia (D.). s. goniomphalos specimens collected were found to be infected with Opisthorchis viverrini (human liver fluke) during 2010 and 2011, respectively. Pomacea canaliculata, the rice crop pest, the intermediate host of Angiostrongylus (Parastrongylus) cantonensis, was found in the greatest numbers during 2010 and 2011; the prevalence increased significantly from 1.3% in 2010 to 53.3% in 2011. We also found seasonal variation in snail populations in terms of abundance and diversity. The snail fauna and risk for transmission of parasitic diseases need to be monitored continuously to evaluate the long-term impact of the dam project.

  2. Walla Walla River Fish Passage Operations Program, 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR)

    2004-12-01

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2003-2004 project year, there were 379 adult summer steelhead (Oncorhynchus mykiss), 36 adult bull trout (Salvelinus confluentus); 108 adult and 3 jack spring chinook (O. tshawytscha) enumerated at the Nursery Bridge Dam fishway video counting window between December 21, 2003, and June 30, 2004. Summer steelhead and spring chinook were observed moving upstream while bull trout were observed moving both upstream and downstream of the facility. In addition, the old ladder trap was operated by the WWBNPME project in order to radio tag spring chinook adults. A total of 2 adult summer steelhead, 4 bull trout, and 23 adult spring chinook were enumerated at the west ladder at Nursery Bridge Dam during the trapping operations between May 6 and May 23, 2004. Operation of the Little Walla Walla

  3. 76 FR 12094 - Whitman River Dam, Inc.

    Science.gov (United States)

    2011-03-04

    ... Dam, Inc. Notice of Application Tendered for Filing With the Commission and Soliciting Additional.... Project No.: 13237-002. c. Date Filed: February 14, 2011. d. Applicant: Whitman River Dam, Inc. e. Name of Project: Crocker Dam Hydro Project. f. Location: On the Whitman River, in the Town of Westminster...

  4. Science partnership between U.S. Geological Survey and the Lower Elwha Klallam Tribe—Understanding the Elwha River Dam Removal Project

    Science.gov (United States)

    Duda, Jeffrey J.; Beirne, Matt M.; Warrick, Jonathan A.; Magirl, Christopher S.

    2018-04-16

    After nearly a century of producing power, two large hydroelectric dams on the Elwha River in Washington State were removed during 2011 to 2014 to restore the river ecosystem and recover imperiled salmon populations. Roughly two-thirds of the 21 million cubic meters of sediment—enough to fill nearly 2 million dump trucks—contained behind the dams was released downstream, which restored natural processes and initiated important changes to the river, estuarine, and marine ecosystems. A multidisciplinary team of scientists from the Lower Elwha Klallam Tribe, academia, non-governmental organizations, Federal and state agencies, and the U.S. Geological Survey collected key data before, during, and after dam removal to understand the outcomes of this historic project on the Elwha River ecosystem.

  5. Abstracts and electronic proceedings of the Canadian Dam Association's 2008 annual conference : emerging technologies for dams

    International Nuclear Information System (INIS)

    2008-01-01

    This conference provided a national forum to explore and discuss emerging technologies which can be used to enhance dam safety and construction practices on both new and existing projects. Advancements in the fields of dam design, construction, and remedial works were reviewed as well as new techniques for dam monitoring programs. Engineers, geoscientists, dam owners and operators and other stakeholders exchanged ideas and information regarding the operation, maintenance and management of water and tailings dams. The conference sessions dealt with a variety of topics, including dam foundations; mining dams; dams and the environment; embankment dams; dams and seismicity; hydrotechnics; assessment and investigative technologies; dam instrumentation and monitoring; computational hydraulics; and dam safety. The conference featured 46 presentations, of which 37 have been catalogued separately for inclusion in this database. refs., tabs., figs

  6. Analysis of environmental issues related to small scale hydroelectric development. II. Design considerations for passing fish upstream around dams. Environmental Sciences Division Publication No. 1567

    Energy Technology Data Exchange (ETDEWEB)

    Hildebrand, S.G. (ed.)

    1980-08-01

    The possible requirement of facilities to move migrating fish upstream around dams may be a factor in determining the feasibility of retrofitting small dams for hydroelectric generation. Basic design considerations are reported that should be evaluated on a site-specific basis if upstream fish passage facilities are being considered for a small scale hydroelectric project (defined as an existing dam that can be retrofitted to generate 25 MW or less). Information on general life history and geographic distribution of fish species that may require passage is presented. Biological factors important in the design of upstream passage facilities are discussed: gas bubble disease, fish swimming speed, oxygen consumption by fish, and diel and photo behavior. Three general types of facilities (fishways, fish locks, and fish lifts) appropriate for upstream fish passage at small scale hydroelectric projects are described, and size dimensions are presented. General design criteria for these facilities (including fish swimming ability and behavior) and general location of facilities at a site are discussed. Basic cost considerations for each type of passage facility, including unit cost, operation and maintenance costs, and costs for supplying attraction water, are indicated.

  7. The Influence of Dam Removal on Upland Soils

    Science.gov (United States)

    Lafrenz, M. D.; Bean, R. A.; Uthman, D.

    2011-12-01

    Driven largely by anadromous fish passage issues, several dams have been removed in the Pacific Northwest and several more are slated to be removed there and in other regions of North America. While much effort has gone into modeling and monitoring the geomorphic and ecologic response of stream channels to dam removal, little research has investigated changes in upland soils following inundation resulting from dam construction, and none had evaluated how these upland soils would respond to dewatering following dam removal. The removal of a relatively large dam - Marmot Dam on the Sandy River in Northwest Oregon, presented an opportunity to evaluate the effect of dewatering on what were formerly upland rather than floodplain soils. We compared the dewatered soils to downstream upland soils that had not been inundated and modified a "ripening" index, which had been developed to characterize dewatered estuary soils in Dutch polders, in order to evaluate the physical and chemical changes taking place in these soils. Two years following dam removal, the previously inundated soils have higher organic matter percentage, cation exchange capacity, and nitrogen levels than downstream soils that were not inundated; yet, this new riparian area is largely devoid of vegetation while the downstream soils maintain a thick (10 cm) O horizon. The carbon to nitrogen ratios (C:N) of upstream surface horizons are low (13:1) and increase markedly with soil depth (54:1); the C:N ratios of downstream soils are typical of other forested soils in this region (28:1 at the surface and 26:1 at depth). Prior to dam removal, it is likely that all upstream, inundated soils had high C:N ratios due to the persistent anaerobic conditions under the reservoir. Following dam removal, soil microbes needing to supplement their nitrogen consumption with soluble nitrogen likely out-competed higher plants for plant available nitrogen. The C:N ratio should have dropped to an equilibrium; this was not

  8. Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R.; McKinstry, C.; Cook, C. [Pacific Northwest National Laboratory

    2005-02-01

    This report documents a four-year study(a) to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee (Oncorhynchus nerka kennerlyi) and rainbow trout (O. mykiss) at the entrance to the forebay of the third powerplant at Grand Coulee Dam. The work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes). In this report, emphasis is placed on the methodology and results associated with the fourth project year and compared with findings from the previous years to provide an overall project summary. Since 1995, the Colville Confederated Tribes have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power and Conservation Council Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph dams on the Columbia River (Figure S.1). A 42-month investigation from 1996 to 1999 determined that from 211,685 to 576,676 fish, including kokanee and rainbow trout, were entrained annually at Grand Coulee Dam. Analysis of the data found that 85% of the total entrainment occurred at the dam's third powerplant. Because these entrainment rates represent a significant loss to the tribal fisheries upstream of the dam, they have been judged unacceptable to fishery managers responsible for perpetuating the fishery in Lake Roosevelt. In an effort to reduce fish entrainment rates, the scope of work for the Chief Joseph Kokanee Enhancement Project was modified in 2001 to include a multiyear study of the efficacy of using strobe lights to deter fish from entering the third powerplant forebay. Pacific Northwest National Laboratory initiated the four-year study in collaboration with Colville

  9. Battle looms over hydroelectric dam relicensing

    International Nuclear Information System (INIS)

    Simpson, J.

    1993-01-01

    Environmental groups, buoyed by support from influential lawmakers, are vowing to change the Federal Energy Regulatory Commission's (FERC's) hydroelectric relicensing procedures. For too long, the groups say, the hydroelectric industry has benefitted from a cozy relationship with the FERC, which has emphasized economic over environmental considerations. The success or failure of the environmentalists agenda will likely prove critical to the hydroelectric industry. With 237 hydroelectric licenses up for renewal this year - the most ever considered by the FERC in one year - and four vacant seats at the Commission, FERC hydro policy appears poised for upheaval. The groups have proposed a multipoint program to address perceived shortcomings in the FERC's hydroelectric relicensing procedures. The program includes recommendations to: Shorten dam licenses (which currently stretch 30 to 50 years) and require the FERC to periodically reevaluate the terms of hydropower licenses; Increase Congressional oversight of the FERC to assure adherence to environmental laws, including the National Environmental Policy Act, which mandates the preparation of environmental impact statements where appropriate; Mandate facilities for upstream and downstream fish passage; Establish a mitigation fund, collectable from dam owners, for river conservation and restoration programs; Promote all alternatives to relicensing projects, including denial of project licenses; and Reassign the FERC's hydropower jurisdiction to another federal agency, such as the Environmental Protection Agency or the Department of the Interior

  10. 78 FR 62627 - Sam Rayburn Dam Rate

    Science.gov (United States)

    2013-10-22

    ... DEPARTMENT OF ENERGY Southwestern Power Administration Sam Rayburn Dam Rate AGENCY: Southwestern... the power rate for the Sam Rayburn Dam (Rayburn) project pursuant to the Rayburn rate schedule (SRD-13..., Wholesale Rates for Hydro Power and Energy Sold to Sam Rayburn Dam Electric Cooperative, Inc. (Contract No...

  11. Dam construction in salt formations

    International Nuclear Information System (INIS)

    Jezierski, H.

    1984-01-01

    Dam Construction is a key task for the safety of the Gorleben repository. In order to seal a fille disposal field from the part in operation and to minimize radionuclide migration during the post-operating time a dam is to be developed and tested under certain accident conditions i.e., mainly the intrusion of brines and natural gas from either side of the dam. The development of this dam is subject of an extensive engineering project. This report summarizes the goals, problems, concepts, and first results of these systematical project studies. By analysing and characterizing special design criteria under site-specific aspects the major development priorities are investigated. First results will be presented concerning concrete based materials and their property changes due to the corrosive behavior of brines at elevated temperatures. Based on these investigations, pilot dams will be built and tested to prove their efficiency

  12. Dams and Intergovernmental Transfers

    Science.gov (United States)

    Bao, X.

    2012-12-01

    Gainers and Losers are always associated with large scale hydrological infrastructure construction, such as dams, canals and water treatment facilities. Since most of these projects are public services and public goods, Some of these uneven impacts cannot fully be solved by markets. This paper tried to explore whether the governments are paying any effort to balance the uneven distributional impacts caused by dam construction or not. It showed that dam construction brought an average 2% decrease in per capita tax revenue in the upstream counties, a 30% increase in the dam-location counties and an insignificant increase in downstream counties. Similar distributional impacts were observed for other outcome variables. like rural income and agricultural crop yields, though the impacts differ across different crops. The paper also found some balancing efforts from inter-governmental transfers to reduce the unevenly distributed impacts caused by dam construction. However, overall the inter-governmental fiscal transfer efforts were not large enough to fully correct those uneven distributions, reflected from a 2% decrease of per capita GDP in upstream counties and increase of per capita GDP in local and downstream counties. This paper may shed some lights on the governmental considerations in the decision making process for large hydrological infrastructures.

  13. Non-native fish control below Glen Canyon Dam - Report from a structured decision-making project

    Science.gov (United States)

    Runge, Michael C.; Bean, Ellen; Smith, David; Kokos, Sonja

    2011-01-01

    This report describes the results of a structured decision-making project by the U.S. Geological Survey to provide substantive input to the Bureau of Reclamation (Reclamation) for use in the preparation of an Environmental Assessment concerning control of non-native fish below Glen Canyon Dam. A forum was created to allow the diverse cooperating agencies and Tribes to discuss, expand, and articulate their respective values; to develop and evaluate a broad set of potential control alternatives using the best available science; and to define individual preferences of each group on how to manage the inherent trade-offs in this non-native fish control problem. This project consisted of two face-to-face workshops, held in Mesa, Arizona, October 18-20 and November 8-10, 2010. At the first workshop, a diverse set of objectives was discussed, which represented the range of concerns of those agencies and Tribes present. A set of non-native fish control alternatives ('hybrid portfolios') was also developed. Over the 2-week period between the two workshops, four assessment teams worked to evaluate the control alternatives against the array of objectives. At the second workshop, the results of the assessment teams were presented. Multi-criteria decision analysis methods were used to examine the trade-offs inherent in the problem, and allowed the participating agencies and Tribes to express their individual judgments about how those trade-offs should best be managed in Reclamation`s selection of a preferred alternative. A broad array of objectives was identified and defined, and an effort was made to understand how these objectives are likely to be achieved by a variety of strategies. In general, the objectives reflected desired future conditions over 30 years. A rich set of alternative approaches was developed, and the complex structure of those alternatives was documented. Multi-criteria decision analysis methods allowed the evaluation of those alternatives against the array

  14. Army Corps of Engineers: Factors Contributing to Cost Increases and Schedule Delays in the Olmsted Locks and Dam Project

    Science.gov (United States)

    2017-02-01

    two 110-by-1,200-foot locks adjacent to the Illinois bank, and a dam composed of five 110-foot-wide tainter gates,20 a 1,400-foot-wide navigable pass ...Corps, more tonnage passes through Olmsted annually than any other place in the nation’s inland navigation system. The Water Resources Development...River and its tributaries and the Mississippi River system must pass through this stretch of river. According to Corps documents, more tonnage passes

  15. Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R.; McKinstry, C.; Simmons, C. (Pacific Northwest National Laboratory)

    2003-01-01

    Since 1995, the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes) have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation concluded that entrainment at Grand Coulee Dam ranged from 211,685 to 576,676 fish annually. Further analysis revealed that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the second year of the study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory. The 2002 study period extended from May 18 through July 30. The objective of the study was to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout. The prototype system consisted of six strobe lights affixed to an aluminum frame suspended vertically underwater from a barge secured in the center of the entrance to the third powerplant forebay. The lights, controlled by a computer, were aimed to illuminate a specific region directly upstream of the barge. Three light level treatments were used: 6 of 6 lights on, 3 of 6 lights on, and all lights off. These three treatment conditions were applied for an entire 24-hr day and were randomly assigned within a 3-day block throughout the study period. A seven

  16. Dam Safety Concepts

    NARCIS (Netherlands)

    Duricic, J.

    2014-01-01

    The majority of dams constructed in the world are dams that can be categorized as embankment dams. Throughout history we can point to many failures of dams, and embankment dams in particular. Nowadays it is clear that the goal to construct stable dams has not been achieved, even with advanced

  17. Kootenai River Wildlife Habitat Enhancement Project : Long-term Bighorn Sheep/Mule Deer Winter and Spring Habitat Improvement Project : Wildlife Mitigation Project, Libby Dam, Montana : Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Yde, Chis

    1990-06-01

    The Libby hydroelectric project, located on the Kootenai River in northwestern Montana, resulted in several impacts to the wildlife communities which occupied the habitats inundated by Lake Koocanusa. Montana Department of Fish, Wildlife and Parks, in cooperation with the other management agencies, developed an impact assessment and a wildlife and wildlife habitat mitigation plan for the Libby hydroelectric facility. In response to the mitigation plan, Bonneville Power Administration funded a cooperative project between the Kootenai National Forest and Montana Department of Fish, Wildlife and Parks to develop a long-term habitat enhancement plan for the bighorn sheep and mule deer winter and spring ranges adjacent to Lake Koocanusa. The project goal is to rehabilitate 3372 acres of bighorn sheep and 16,321 acres of mule deer winter and spring ranges on Kootenai National Forest lands adjacent to Lake Koocanusa and to monitor and evaluate the effects of implementing this habitat enhancement work. 2 refs.

  18. Environmental Assessment and Finding of No Significant Impact: Pond B Dam Repair Project at the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-09-27

    The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1285) for the proposed repair of the Pond B dam at the Savannah River Site (SRS), located near Aiken, South Carolina. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an environmental impact statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings.

  19. NOAA TIFF Image - 1m Multibeam Bathymetry, US Virgin Islands - Virgin Passage - Project NF-10-03 - (2010), UTM 20N NAD83

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This dataset contains a GeoTIFF with 1x1 meter cell size representing the bathymetry of a portion of the Virgin Passage, a selected area of seafloor southwest of St....

  20. NOAA TIFF Image - 1m Multibeam Bathymetry, US Virgin Islands - Virgin Passage - Project NF-10-03 - (2010), UTM 20N NAD83 (NCEI Accession 0131854)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This dataset contains a GeoTIFF with 1x1 meter cell size representing the bathymetry of a portion of the Virgin Passage, a selected area of seafloor southwest of St....

  1. Chief Joseph Kokanee Enhancement Project : Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grond Coulee Dam Third Powerplant Forebay.

    Energy Technology Data Exchange (ETDEWEB)

    Simmons, M.A.; McKinstry, C.A.; Simmons, C.S.

    2002-01-01

    Since 1995, the Colville Confederated Tribes have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council's (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation concluded that entrainment at Grand Coulee Dam ranged from 211,685 to 576,676 fish annually. Further analysis revealed that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC's Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the first year of the study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory (PNNL). The objective of the study was to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout. Analysis of the effect of strobe lights on the distribution (numbers) and behavior of kokanee and rainbow trout was based on 51, 683 fish targets detected during the study period (June 30 through August 1, 2001). Study findings include the following: (1) Analysis of the count data indicated that significantly more fish were present when the lights were on compared to off. This was true for both the 24-hr tests as well as the 1-hr tests. Powerplant discharge, distance from lights, and date were significant factors in the analysis. (2) Behavioral results indicated that fish within 14 m of the lights were trying to avoid the lights by swimming across the lighted

  2. Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at the Grand Coulee Dam Third Powerplant Forebay, 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Simmons, M.; McKinstry, C.; Cook, C.

    2004-01-01

    Since 1995, the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes) have managed the Chief Joseph Kokanee Enhancement Project as part of the Northwest Power Planning Council (NWPPC) Fish and Wildlife Program. Project objectives have focused on understanding natural production of kokanee (a land-locked sockeye salmon) and other fish stocks in the area above Grand Coulee and Chief Joseph Dams on the Columbia River. A 42-month investigation from 1996 to 1999 determined that from 211,685 to 576,676 fish were entrained annually at Grand Coulee Dam. Analysis of the entrainment data found that 85% of the total entrainment occurred at the dam's third powerplant. These numbers represent a significant loss to the tribal fisheries upstream of the dam. In response to a suggestion by the NWPPC Independent Scientific Review Panel, the scope of work for the Chief Joseph Kokanee Enhancement Project was expanded to include a multiyear pilot test of a strobe light system to help mitigate fish entrainment. This report details the work conducted during the third year of the strobe light study by researchers of the Colville Confederated Tribes in collaboration with the Pacific Northwest National Laboratory. The objective of the study is to determine the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee and rainbow trout under field conditions. The prototype system consists of six strobe lights affixed to an aluminum frame suspended 15 m vertically underwater from a barge secured in the center of the entrance to the third powerplant forebay. The lights, controlled by a computer, illuminate a region directly upstream of the barge. The 2003 study period extended from June 16 through August 1. Three light treatments were used: all six lights on for 24 hours, all lights off for 24 hours, and three of six lights cycled on and off every hour for 24 hours. These three treatment conditions were assigned randomly

  3. Establishment and implementation of a dam safety program

    International Nuclear Information System (INIS)

    Rogers, R.

    1993-01-01

    The reasons for implementing dam safety programs are discussed, and a model for a dam safety program is outlined. A dam safety program should consist of regular inspections, reservoir monitoring, an emergency action plan, remedial work, registration permit reports, routine maintenance, and careful water supply management. Recommendations on initiating and implementing a dam safety program include: communication with the appropriate regulatory authority; communication with maintenance crews; communication with management; a well-rounded dam inspection team; the inclusion of maintenance items in dam modification projects; visual inspection of the dam; monitoring key indicators such as monuments and piezometer readings; and keeping current with the literature. 4 refs

  4. Costa Rica's Presentation to the 1st Workshop on Problems of Leakage in Dams

    International Nuclear Information System (INIS)

    Cordero Calderon, C.F.

    1994-03-01

    This paper includes information about the Instituto Costarricense de Electricidad (ICE); the project T racer Application to Leakage in Dams; the description of the Cachi's Dam and the description of the Arenal's Dam. (S. Grainger)

  5. Earthquake induced liquefaction analysis of Tendaho earth-fill dam ...

    African Journals Online (AJOL)

    fill dam, which is part of Tendaho Dam and Irrigation Project; the largest irrigation project in Ethiopia to date. The dam is located in the most seismic part of Ethiopia and was originally designed to be founded on potentially liquefiable alluvium ...

  6. Exporting dams: China's hydropower industry goes global.

    Science.gov (United States)

    McDonald, Kristen; Bosshard, Peter; Brewer, Nicole

    2009-07-01

    In line with China's "going out" strategy, China's dam industry has in recent years significantly expanded its involvement in overseas markets. The Chinese Export-Import Bank and other Chinese financial institutions, state-owned enterprises, and private firms are now involved in at least 93 major dam projects overseas. The Chinese government sees the new global role played by China's dam industry as a "win-win" situation for China and host countries involved. But evidence from project sites such as the Merowe Dam in Sudan demonstrates that these dams have unrecognized social and environmental costs for host communities. Chinese dam builders have yet to adopt internationally accepted social and environmental standards for large infrastructure development that can assure these costs are adequately taken into account. But the Chinese government is becoming increasingly aware of the challenge and the necessity of promoting environmentally and socially sound investments overseas.

  7. PREDICTION OF TOTAL DISSOLVED GAS EXCHANGE AT HYDROPOWER DAMS

    Energy Technology Data Exchange (ETDEWEB)

    Hadjerioua, Boualem [ORNL; Pasha, MD Fayzul K [ORNL; Stewart, Kevin M [ORNL; Bender, Merlynn [Bureau of Reclamation; Schneider, Michael L. [U.S. Army Corps of Engineers

    2012-07-01

    Total dissolved gas (TDG) supersaturation in waters released at hydropower dams can cause gas bubble trauma in fisheries resulting in physical injuries and eyeball protrusion that can lead to mortality. Elevated TDG pressures in hydropower releases are generally caused by the entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin. The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. These dam operations are constrained by state and federal water quality standards for TDG saturation which balance the benefits of spillway operations designed for Endangered Species Act (ESA)-listed fisheries versus the degradation to water quality as defined by TDG saturation. In the 1970s, the United States Environmental Protection Agency (USEPA), under the federal Clean Water Act (Section 303(d)), established a criterion not to exceed the TDG saturation level of 110% in order to protect freshwater and marine aquatic life. The states of Washington and Oregon have adopted special water quality standards for TDG saturation in the tailrace and forebays of hydropower facilities on the Columbia and Snake Rivers where spillway operations support fish passage objectives. The physical processes that affect TDG exchange at hydropower facilities have been studied throughout the CRB in site-specific studies and routine water quality monitoring programs. These data have been used to quantify the relationship between project operations, structural properties, and TDG exchange. These data have also been used to develop predictive models of TDG exchange to support real-time TDG management decisions. These empirically based predictive models have been developed for specific projects and account for both the fate of spillway and

  8. The Application of Traits-Based Assessment Approaches to Estimate the Effects of Hydroelectric Turbine Passage on Fish Populations

    Energy Technology Data Exchange (ETDEWEB)

    Cada, Glenn F [ORNL; Schweizer, Peter E [ORNL

    2012-04-01

    One of the most important environmental issues facing the hydropower industry is the adverse impact of hydroelectric projects on downstream fish passage. Fish that migrate long distances as part of their life cycle include not only important diadromous species (such as salmon, shads, and eels) but also strictly freshwater species. The hydropower reservoirs that downstream-moving fish encounter differ greatly from free-flowing rivers. Many of the environmental changes that occur in a reservoir (altered water temperature and transparency, decreased flow velocities, increased predation) can reduce survival. Upon reaching the dam, downstream-migrating fish may suffer increased mortality as they pass through the turbines, spillways and other bypasses, or turbulent tailraces. Downstream from the dam, insufficient environmental flow releases may slow downstream fish passage rates or decrease survival. There is a need to refine our understanding of the relative importance of causative factors that contribute to turbine passage mortality (e.g., strike, pressure changes, turbulence) so that turbine design efforts can focus on mitigating the most damaging components. Further, present knowledge of the effectiveness of turbine improvements is based on studies of only a few species (mainly salmon and American shad). These data may not be representative of turbine passage effects for the hundreds of other fish species that are susceptible to downstream passage at hydroelectric projects. For example, there are over 900 species of fish in the United States. In Brazil there are an estimated 3,000 freshwater fish species, of which 30% are believed to be migratory (Viana et al. 2011). Worldwide, there are some 14,000 freshwater fish species (Magurran 2009), of which significant numbers are susceptible to hydropower impacts. By comparison, in a compilation of fish entrainment and turbine survival studies from over 100 hydroelectric projects in the United States, Winchell et al. (2000

  9. NRC inventory of dams

    International Nuclear Information System (INIS)

    Lear, G.E.; Thompson, O.O.

    1983-01-01

    The NRC Inventory of Dams has been prepared as required by the charter of the NRC Dam Safety Officer. The inventory lists 51 dams associated with nuclear power plant sites and 14 uranium mill tailings dams (licensed by NRC) in the US as of February 1, 1982. Of the 85 listed nuclear power plants (148 units), 26 plants obtain cooling water from impoundments formed by dams. The 51 dams associated with the plants are: located on a plant site (29 dams at 15 plant sites); located off site but provide plant cooling water (18 dams at 11 additional plant sites); and located upstream from a plant (4 dams) - they have been identified as dams whose failure, and ensuing plant flooding, could result in a radiological risk to the public health and safety. The dams that might be considered NRC's responsibility in terms of the federal dam safety program are identified. This group of dams (20 on nuclear power plant sites and 14 uranium mill tailings dams) was obtained by eliminating dams that do not pose a flooding hazard (e.g., submerged dams) and dams that are regulated by another federal agency. The report includes the principal design features of all dams and related useful information

  10. Cowlitz Falls fish passage

    International Nuclear Information System (INIS)

    1995-09-01

    The upper Cowlitz was once home to native salmon and steelhead. But the combined impacts of overharvest, farming, logging and road building hammered fish runs. And in the 1960s, a pair of hydroelectric dams blocked the migration path of ocean-returning and ocean-going fish. The lower Cowlitz still supports hatchery runs of chinook, coho and steelhead. But some 200 river miles in the upper river basin--much of it prime spawning and rearing habitat--have been virtually cut off from the ocean for over 26 years. Now the idea is to trap-and-haul salmon and steelhead both ways and bypass previously impassable obstacles in the path of anadromous fish. The plan can be summarized, for the sake of explanation, in three steps: (1) trap and haul adult fish--collect ocean-returning adult fish at the lowermost Cowlitz dam, and truck them upstream; (2) reseed--release the ripe adults above the uppermost dam, and let them spawn naturally, at the same time, supplement these runs with hatchery born fry that are reared and imprinted in ponds and net pens in the watershed; (3) trap and haul smolts--collection the new generation of young fish as they arrive at the uppermost Cowlitz dam, truck them past the three dams, and release them to continue their downstream migration to the sea. The critical part of any fish-collection system is the method of fish attraction. Scientists have to find the best combination of attraction system and screens that will guide young fish to the right spot, away from the turbine intakes. In the spring of 1994 a test was made of a prototype system of baffles and slots on the upriver face of the Cowlitz Falls Dam. The prototype worked at 90% efficiency in early tests, and it worked without the kind of expensive screening devices that have been installed on other dams. Now that the success of the attraction system has been verified, Harza engineers and consultants will design and build the appropriate collection part of the system

  11. 75 FR 81604 - Price Dam Partnership, Limited; Notice of Request for Extension of Time to Commence and Complete...

    Science.gov (United States)

    2010-12-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12187-016] Price Dam.... Applicant: Price Dam Partnership, Limited. e. Name of Project: Price Dam Hydroelectric Project. f. Location... Locks and Dam on the Mississippi River, in Madison County, Illinois. The project would occupy...

  12. Studies of water leakage in dams. Course

    International Nuclear Information System (INIS)

    Cordero-Calderon, C.F.

    1995-01-01

    With this training about the study of Water Leakage in Dams and Damming, the institutional worker will have the necessary criteria in this topic, and also an opportunity to analyze the impact of this engineering work at national level. This course permits to transmit part of the knowlege acquired by the Arcal XVIII RLA/8/018, Application of Tracer Techniques for Leakage in Dams and Damming Project, where ICE participates in agreement with Atomic Energy Commission of Costa Rica, sponsored by the International Organization of Atomic Energy. (author). 14 charts, 36 figs, 2 maps, 6 tabs

  13. The socio-political effects of forced migrations linked to major hydraulic projects in China. The example of the Three Gorges dam - CERI Studies No. 103

    International Nuclear Information System (INIS)

    Padovani, Florence

    2004-04-01

    The study of the population movements caused by the major Chinese hydraulic projects reveals the true extent of the change which has come about in relations between the State and society in China. The construction of the Three Gorges dam - which led to considerable controversy both within China and beyond - is a prime case in point. As well as its social consequences, this infrastructure project has ramifications in the political, economic and legal domains, notably because of the forced migrations which it has entailed. The manner in which this question has been managed - both by central government, which planned the project, and by the provincial governments, which had to manage time constraints and financial and human resources at first hand - illustrates the extent to which the country has moved away from the authoritarian approach which had currency under the rule of Chairman Mao. The study of the project provides insights into the manner in which the authorities on the ground actually applied the directives received from the Centre, and into the difficulty encountered by the rulers in Beijing in ensuring that their centralised vision of the new China holds sway. The way in which the sensitive issue of forced migrations has been managed highlights what is at stake in the disputes between the various players, i.e. officials in the many ministries concerned, local and provincial authorities, displaced populations and host populations. The specific modes of justification employed by each group provide pointers towards an understanding of the complexity of China's new 'civil society'. (author)

  14. Groundwater Forecasting Optimization Pertain to Dam Removal

    Science.gov (United States)

    Brown, L.; Berthelote, A. R.

    2011-12-01

    There is increasing interest in removing dams due to changing ecological and societal values. Groundwater recharge rate is closely connected to reservoir presence or absence. With the removal of dams and their associated reservoirs, reductions in groundwater levels are likely to impact water supplies for domestic, industrial and agricultural use. Therefore accessible economic and time effective tools to forecast groundwater level declines with acceptable uncertainty following dam removals are critical for public welfare and healthy regional economies. These tools are also vital to project planning and provide beneficial information for restoration and remediation managements. The standard tool for groundwater forecasting is 3D Numerical modeling. Artificial Neural Networks (ANNs) may be an alternative tool for groundwater forecasting pertain to dam removal. This project compared these two tools throughout the Milltown Dam removal in Western Montana over a five year period. It was determined that ANN modeling had equal or greater accuracy for groundwater forecasting with far less effort and cost involved.

  15. Safeguards, financing, and employment in Chinese infrastructure projects in Africa: the case of Ghana’s Bui Dam

    NARCIS (Netherlands)

    Kirchherr, J.W.; Disselhoff, Tim; Charles, Katrina J.

    Chinese players are now Africa’s key partner for its infrastructure sector (including water supply projects), providing approximately two-thirds of investments since 2007. The social impacts of these engagements during the construction phase are mostly portrayed in an alarmist tone within the

  16. 78 FR 60271 - Hollow Dam Power Company; Ampersand Hollow Dam Hydro, LLC; Notice of Application for Transfer of...

    Science.gov (United States)

    2013-10-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 6972-032] Hollow Dam Power Company; Ampersand Hollow Dam Hydro, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On September 10, 2013, Hollow Dam Power Company (transferor) and...

  17. The Total Risk Analysis of Large Dams under Flood Hazards

    Directory of Open Access Journals (Sweden)

    Yu Chen

    2018-02-01

    Full Text Available Dams and reservoirs are useful systems in water conservancy projects; however, they also pose a high-risk potential for large downstream areas. Flood, as the driving force of dam overtopping, is the main cause of dam failure. Dam floods and their risks are of interest to researchers and managers. In hydraulic engineering, there is a growing tendency to evaluate dam flood risk based on statistical and probabilistic methods that are unsuitable for the situations with rare historical data or low flood probability, so a more reasonable dam flood risk analysis method with fewer application restrictions is needed. Therefore, different from previous studies, this study develops a flood risk analysis method for large dams based on the concept of total risk factor (TRF used initially in dam seismic risk analysis. The proposed method is not affected by the adequacy of historical data or the low probability of flood and is capable of analyzing the dam structure influence, the flood vulnerability of the dam site, and downstream risk as well as estimating the TRF of each dam and assigning corresponding risk classes to each dam. Application to large dams in the Dadu River Basin, Southwestern China, demonstrates that the proposed method provides quick risk estimation and comparison, which can help local management officials perform more detailed dam safety evaluations for useful risk management information.

  18. The Northwest Passage Dispute

    DEFF Research Database (Denmark)

    Burke, Danita Catherine

    2018-01-01

    This is an article written for the Oxford Research Group "Sustainable Security" series. It gives an overview of the dispute of the Northwest Passage and discusses factors which will contribute to the evolution of the dispute in the 21st century. This short contribution summarizes and adds to the ...... to the research recently published by the author through Palgrave Macmillan, Danita Catherine Burke, 2018, International Disputes and Cultural Ideas in the Canadian Arctic...

  19. Assessment of 21st century drought conditions at Shasta Dam based on dynamically projected water supply conditions by a regional climate model coupled with a physically-based hydrology model.

    Science.gov (United States)

    Trinh, T; Ishida, K; Kavvas, M L; Ercan, A; Carr, K

    2017-05-15

    Along with socioeconomic developments, and population increase, natural disasters around the world have recently increased the awareness of harmful impacts they cause. Among natural disasters, drought is of great interest to scientists due to the extraordinary diversity of their severity and duration. Motivated by the development of a potential approach to investigate future possible droughts in a probabilistic framework based on climate change projections, a methodology to consider thirteen future climate projections based on four emission scenarios to characterize droughts is presented. The proposed approach uses a regional climate model coupled with a physically-based hydrology model (Watershed Environmental Hydrology Hydro-Climate Model; WEHY-HCM) to generate thirteen equally likely future water supply projections. The water supply projections were compared to the current water demand for the detection of drought events and estimation of drought properties. The procedure was applied to Shasta Dam watershed to analyze drought conditions at the watershed outlet, Shasta Dam. The results suggest an increasing water scarcity at Shasta Dam with more severe and longer future drought events in some future scenarios. An important advantage of the proposed approach to the probabilistic analysis of future droughts is that it provides the drought properties of the 100-year and 200-year return periods without resorting to any extrapolation of the frequency curve. Copyright © 2017 Elsevier B.V. All rights reserved.

  20. Sensor Fish: an autonomous sensor package for characterizing complex flow fields and fish passage

    Energy Technology Data Exchange (ETDEWEB)

    Deng, Zhiqun; Martinez, Jayson J.; Lu, Jun

    2016-10-04

    Fish passing through dams or other hydraulic structures may be injured or killed despite advances in turbine design, project operations, and other fish bypass systems. The Sensor Fish (SF) device is an autonomous sensor package that characterizes the physical conditions and stressors to which fish are exposed during passage through hydro facilities. It was designed to move passively as a neutrally buoyant object through severe hydraulic environments, while collecting high-resolution sensor data. Since its first generation1, the SF device has been successfully deployed in many fish passage studies and has evolved to be a major tool for characterizing fish passage conditions during fish passage in the Columbia River Basin. To better accelerate hydropower development, the U.S. Department of Energy Water Power Program provided funding to develop a new generation (Gen 2 SF) to incorporate more capabilities and accommodate a wider range of users over a broader range of turbine designs and operating environments. The Gen 2 SF (Figure 1) is approximately the size and density of a yearling salmon smolt and is nearly neutrally buoyant. It contains three-dimensional (3D) rotation sensors, 3D linear acceleration sensors, a pressure sensor, a temperature sensor, a 3D orientation sensor, a radiofrequency (RF) transmitter, and a recovery module2. A low-power microcontroller collects data from the sensors and stores up to 5 min of data on internal flash memory at a sampling frequency of 2048 Hz. The recovery module makes the SF positively buoyant after a pre-programmed period of time, causing it to float to the surface for recovery.

  1. Umatilla River Fish Passage Operations Program, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bronson, James P. (Confederated Tribes of the Umatilla Indian Reservation, Department of Natural Resources, Pendleton, OR); Duke, Bill B. (Oregon Department of Fish and Wildlife, Pendleton, OR)

    2004-03-01

    Threemile Falls Dam (Threemile Dam), located near the town of Umatilla, is the major collection and counting point for adult salmonids returning to the Umatilla River. Returning salmon and steelhead were enumerated at Threemile Dam from August 17, 2002 to September 29, 2003. A total of 3,080 summer steelhead (Oncorhynchus mykiss); 1716 adult, 617 jack, and 1,709 subjack fall chinook (O. tshawytscha); 3,820 adult and 971 jack coho (O. kisutch); and 3,607 adult and 135 jack spring chinook (O. tshawytscha) were counted. All fish were enumerated at the east bank facility. Of the fish counted, 6 summer steelhead and 330 adult and 49 jack spring chinook were hauled upstream from Threemile Dam. There were 2,882 summer steelhead; 1161 adult, 509 jack and 1,546 subjack fall chinook; 3,704 adult and 915 jack coho; and 2,406 adult and 31 jack spring chinook either released at, or allowed to volitionally migrate past, Threemile Dam. Also, 109 summer steelhead; 532 adult and 32 jack fall chinook; and 560 adult and 28 jack spring chinook were collected for brood. In addition, 282 spring chinook were collected for the outplanting efforts in the Walla Walla Basin. The Westland Canal juvenile facility (Westland), located near the town of Echo at rivermile (RM) 27, is the major collection point for outmigrating juvenile salmonids and steelhead kelts. The canal was open for 159 days between January 27 and July 4, 2003. During that period, fish were bypassed back to the river 145 days and were trapped 11 days. An estimated 205 pounds of juvenile fish were transported from Westland to the Umatilla River boat ramp (RM 0.5). Approximately 82% of the juveniles transported were salmonids. No steelhead kelts were hauled from Westland this year. The Threemile Dam west bank juvenile bypass was opened on September 16, 2002. and continued until November 1, 2002. The bypass was reopened March 3, 2003 and ran until July 3, 2003. The juvenile trap was operated by the Umatilla Passage Evaluation

  2. Hydraulic Research for Spillway Dam of Jambor Weir at Polotsk Hydroelectric Station

    Directory of Open Access Journals (Sweden)

    G. G. Kruglov

    2012-01-01

    Full Text Available The paper describes hydraulic tests of discharge capacity and pools conjunction in respect of dam spillway of Jambor weir at the Polotsk hydroelectric station. The process of ice passage through the spillway dam has been studied in the paper. The paper contains recommendations on safety depth downstream.

  3. Australian experience of fish passage past instream structures

    International Nuclear Information System (INIS)

    Lewis, B.

    2008-01-01

    The growth in hydropower has resulted in the construction of various structures across rivers and streams, such as dams and weirs, which may impede essential fish movements and result in local extinctions of some fish species. When it is not practical to build instream structures that provide for fish passage, it may be appropriate to install some type of fishway. Site specific factors such as the fish species present, topography, flow characteristics and cost effectiveness will determine how best to provide for fish passage. The types of fishways suitable at small dams and weirs up to five metres high were described in this paper along with their benefits and effectiveness. The purpose was to provide simple and appropriate solutions that can improve the health of rivers considerably by managing the native aquatic habitat. The upstream passage past obstacles can be provided for through several types of fishways such as pool-type fishways, Denil fish passes, rock ramps, nature-like bypass channels, fish lifts or locks, collection and transportation facilities. In addition to environmental benefits, providing for fish passage can have long term social and economic benefits as well. 17 refs., 3 figs

  4. Environmental monitoring at Olympic Dam

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The environmental management and protection program at the Olympic Dam uranium/copper/gold project, Roxby Downs, South Australia, monitors eight major environmental parameters - meteorology, vegetation, mine site rehabilitation, fauna, terrain, soil salinity, hydrogeology and well fields. It came into effect with the approval of the South Australian Government in March 1987. The Great Artesian Basin, one of the world's greatest artesian basins, is the source of the water supply for the project

  5. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    DeHart, Michele (Columbia Basin Fish and Wildlife Authority, Fish Passage Center, Portland, OR)

    2002-07-01

    Extremely poor water conditions within the Columbia River Basin along with extraordinary power market conditions created an exceptionally poor migration year for juvenile salmon and steelhead. Monthly 2001 precipitation at the Columbia above Grand Coulee, the Snake River above Ice Harbor, and the Columbia River above The Dalles was approximately 70% of average. As a result the 2001 January-July runoff volume at The Dalles was the second lowest in Columbia River recorded history. As a compounding factor to the near record low flows in 2001, California energy deregulation and the resulting volatile power market created a financial crisis for the Bonneville Power Administration (BPA). Power emergencies were first declared in the summer and winter of 2000 for brief periods of time. In February of 2001, and on April 3, the BPA declared a ''power emergency'' and suspended many of the Endangered Species Act (ESA) and Biological Opinion (Opinion) measures that addressed mainstem Columbia and Snake Rivers juvenile fish passage. The river and reservoir system was operated primarily for power generation. Power generation requirements in January through March coincidentally provided emergence and rearing flows for the Ives-Pierce Islands spawning area below Bonneville Dam. In particular, flow and spill measures to protect juvenile downstream migrant salmon and steelhead were nearly totally suspended. Spring and summer flows were below the Opinion migration target at all sites. Maximum smolt transportation was implemented instead of the Opinion in-river juvenile passage measures. On May 16, the BPA Administrator decided to implement a limited spill for fish passage at Bonneville and The Dalles dams. On May 25, a limited spill program was added at McNary and John Day dams. Spill extended to July 15. Juvenile migrants, which passed McNary Dam after May 21, experienced a noticeable, improved survival, as a benefit of spill at John Day Dam. The suspension of

  6. Large-scale projects in the amazon and human exposure to mercury: The case-study of the Tucuruí Dam.

    Science.gov (United States)

    Arrifano, Gabriela P F; Martín-Doimeadios, Rosa C Rodríguez; Jiménez-Moreno, María; Ramírez-Mateos, Vanesa; da Silva, Núbia F S; Souza-Monteiro, José Rogério; Augusto-Oliveira, Marcus; Paraense, Ricardo S O; Macchi, Barbarella M; do Nascimento, José Luiz M; Crespo-Lopez, Maria Elena

    2018-01-01

    The Tucuruí Dam is one of the largest dams ever built in the Amazon. The area is not highly influenced by gold mining as a source of mercury contamination. Still, we recently noted that one of the most consumed fishes (Cichla sp.) is possibly contaminated with methylmercury. Therefore, this work evaluated the mercury content in the human population living near the Tucuruí Dam. Strict exclusion/inclusion criteria were applied for the selection of participants avoiding those with altered hepatic and/or renal functions. Methylmercury and total mercury contents were analyzed in hair samples. The median level of total mercury in hair was above the safe limit (10µg/g) recommended by the World Health Organization, with values up to 75µg/g (about 90% as methylmercury). A large percentage of the participants (57% and 30%) showed high concentrations of total mercury (≥ 10µg/g and ≥ 20µg/g, respectively), with a median value of 12.0µg/g. These are among the highest concentrations ever detected in populations living near Amazonian dams. Interestingly, the concentrations are relatively higher than those currently shown for human populations highly influenced by gold mining areas. Although additional studies are needed to confirm the possible biomagnification and bioaccumulation of mercury by the dams in the Amazon, our data already support the importance of adequate impact studies and continuous monitoring. More than 400 hydropower dams are operational or under construction in the Amazon, and an additional 334 dams are presently planned/proposed. Continuous monitoring of the populations will assist in the development of prevention strategies and government actions to face the problem of the impacts caused by the dams. Copyright © 2017 Elsevier Inc. All rights reserved.

  7. Evaluating safety of concrete gravity dam on weak rock: Scott Dam

    International Nuclear Information System (INIS)

    Goodman, R.E.; Ahlgren, C.S.

    2000-01-01

    Scott Dam is owned and operated by Pacific Gas and Electric Co. (PG and E) as part of the Potter Valley Project. Although it is an unimpressive concrete gravity dam [233 m (765 ft) long with maximum water surface 33.4 m (110 ft) above tail water], the dam has unusually complex and weak foundation rocks; thick condition caused design changes during construction, numerous subsequent special investigations, and several corrections and additions. A main stumbling block to clarification of the dam safety issue for Scott Dam has always been difficulty in characterizing the foundation material. This paper discusses an approach to this problem as well s how the safety of the dam was subsequently confirmed. Following a comprehensive program of research, investigations, and analysis from 1991 to 1997

  8. Alpine dams

    Directory of Open Access Journals (Sweden)

    Alain Marnezy

    2009-03-01

    Full Text Available Les barrages-réservoirs de montagne ont été réalisés initialement dans les Alpes pour répondre à la demande d’énergie en période hivernale. Une certaine diversification des usages de l’eau s’est ensuite progressivement développée, en relation avec le développement touristique des collectivités locales. Aujourd’hui, la participation des ouvrages d’Électricité De France à la production de neige de culture représente une nouvelle étape. Dans les régions où les aménagements hydroélectriques sont nombreux, les besoins en eau pour la production de neige peuvent être résolus par prélèvements à partir des adductions EDF. Les gestionnaires de stations échappent ainsi aux inconvénients liés à la construction et à la gestion des « retenues collinaires ». Cette évolution, qui concerne déjà quelques régions alpines comme la haute Maurienne ou le Beaufortin, apparaît comme une forme renouvelée d’intégration territoriale de la ressource en eau.Mountain reservoirs were initially built in the Alps to meet energy needs in the winter. A certain diversification in the uses of water then gradually developed, related to tourism development in the local communities. Today, the use of facilities belonging to EDF (French Electricity Authority to provide water for winter resorts to make artificial snow represents a new phase. By taking water from EDF resources to supply snow-making equipment, resort managers are thus able to avoid the problems related to the construction and management of small headwater dams. This new orientation in the use of mountain water resources already affects a number of alpine regions such as the Upper Maurienne valley and Beaufortain massif and represents a renewed form of the territorial integration of water resources.

  9. National dam inventory provides data for analysis

    International Nuclear Information System (INIS)

    Spragens, L.

    1992-01-01

    The Association of State Dam Safety Officials completed a dam inventory this fall. Information on approximately 90,000 state-regulated dams in the US collected during the four-year inventory is being used to build a database managed by the Federal Emergency Management Agency. In addition to ASDSO's work, the federal government conducted an inventory of federal dams. This data will be added to the state information to form one national database. The database will feature 35 data fields for each entry, including the name of the dam, its size, the name of the nearest downstream community, maximum discharge and storage volume, the date of the last inspection, and details about the emergency action plan. The program is an update of the nation's first dam inventory, required by the Dam Safety Act of 1972. The US Army Corps of Engineers completed the original inventory in 1981. The Water Resources Development Act of 1986 authorized appropriations of $2.5 million for the Corps to update the inventory. FEMA and the Corps entered into an agreement for FEMA to undertake the task for the Corps and to coordinate work on both the federal and state inventories. ASDSO compiles existing information on state-regulated dams into a common format for the database, added missing information, and established a process for continually updating data. ASDSO plans to analyze the information collected for the database. It will look at statistics for the number of dams regulated, communities that could be affected, and the number of high-hazard dams. FEMA is preparing reports for Congress on the project. The reports, which are expected to be ready by May 1993, will include information on the methodology used and facts about regulated dams under state jurisdiction

  10. The future of fish passage science, engineering, and practice

    Science.gov (United States)

    Silva, Ana T.; Lucas, Martyn C.; Castro-Santos, Theodore R.; Katopodis, Christos; Baumgartner, Lee J.; Thiem, Jason D.; Aarestrup, Kim; Pompeu, Paulo S.; O'Brien, Gordon C.; Braun, Douglas C.; Burnett, Nicholas J.; Zhu, David Z.; Fjeldstad, Hans-Petter; Forseth, Torbjorn; Rajarathnam, Nallamuthu; Williams, John G.; Cooke, Steven J.

    2018-01-01

    Much effort has been devoted to developing, constructing and refining fish passage facilities to enable target species to pass barriers on fluvial systems, and yet, fishway science, engineering and practice remain imperfect. In this review, 17 experts from different fish passage research fields (i.e., biology, ecology, physiology, ecohydraulics, engineering) and from different continents (i.e., North and South America, Europe, Africa, Australia) identified knowledge gaps and provided a roadmap for research priorities and technical developments. Once dominated by an engineering‐focused approach, fishway science today involves a wide range of disciplines from fish behaviour to socioeconomics to complex modelling of passage prioritization options in river networks. River barrier impacts on fish migration and dispersal are currently better understood than historically, but basic ecological knowledge underpinning the need for effective fish passage in many regions of the world, including in biodiversity hotspots (e.g., equatorial Africa, South‐East Asia), remains largely unknown. Designing efficient fishways, with minimal passage delay and post‐passage impacts, requires adaptive management and continued innovation. While the use of fishways in river restoration demands a transition towards fish passage at the community scale, advances in selective fishways are also needed to manage invasive fish colonization. Because of the erroneous view in some literature and communities of practice that fish passage is largely a proven technology, improved international collaboration, information sharing, method standardization and multidisciplinary training are needed. Further development of regional expertise is needed in South America, Asia and Africa where hydropower dams are currently being planned and constructed.

  11. Dam removal: Listening in

    Science.gov (United States)

    Foley, M. M.; Bellmore, J. R.; O'Connor, J. E.; Duda, J. J.; East, A. E.; Grant, G. E.; Anderson, C. W.; Bountry, J. A.; Collins, M. J.; Connolly, P. J.; Craig, L. S.; Evans, J. E.; Greene, S. L.; Magilligan, F. J.; Magirl, C. S.; Major, J. J.; Pess, G. R.; Randle, T. J.; Shafroth, P. B.; Torgersen, C. E.; Tullos, D.; Wilcox, A. C.

    2017-07-01

    Dam removal is widely used as an approach for river restoration in the United States. The increase in dam removals—particularly large dams—and associated dam-removal studies over the last few decades motivated a working group at the USGS John Wesley Powell Center for Analysis and Synthesis to review and synthesize available studies of dam removals and their findings. Based on dam removals thus far, some general conclusions have emerged: (1) physical responses are typically fast, with the rate of sediment erosion largely dependent on sediment characteristics and dam-removal strategy; (2) ecological responses to dam removal differ among the affected upstream, downstream, and reservoir reaches; (3) dam removal tends to quickly reestablish connectivity, restoring the movement of material and organisms between upstream and downstream river reaches; (4) geographic context, river history, and land use significantly influence river restoration trajectories and recovery potential because they control broader physical and ecological processes and conditions; and (5) quantitative modeling capability is improving, particularly for physical and broad-scale ecological effects, and gives managers information needed to understand and predict long-term effects of dam removal on riverine ecosystems. Although these studies collectively enhance our understanding of how riverine ecosystems respond to dam removal, knowledge gaps remain because most studies have been short (< 5 years) and do not adequately represent the diversity of dam types, watershed conditions, and dam-removal methods in the U.S.

  12. Dam removal: Listening in

    Science.gov (United States)

    Foley, Melissa M.; Bellmore, James; O'Connor, James E.; Duda, Jeff; East, Amy E.; Grant, Gordon G.; Anderson, Chauncey; Bountry, Jennifer A.; Collins, Mathias J.; Connolly, Patrick J.; Craig, Laura S.; Evans, James E.; Greene, Samantha; Magilligan, Francis J.; Magirl, Christopher S.; Major, Jon J.; Pess, George R.; Randle, Timothy J.; Shafroth, Patrick B.; Torgersen, Christian E.; Tullos, Desiree D.; Wilcox, Andrew C.

    2017-01-01

    Dam removal is widely used as an approach for river restoration in the United States. The increase in dam removals—particularly large dams—and associated dam-removal studies over the last few decades motivated a working group at the USGS John Wesley Powell Center for Analysis and Synthesis to review and synthesize available studies of dam removals and their findings. Based on dam removals thus far, some general conclusions have emerged: (1) physical responses are typically fast, with the rate of sediment erosion largely dependent on sediment characteristics and dam-removal strategy; (2) ecological responses to dam removal differ among the affected upstream, downstream, and reservoir reaches; (3) dam removal tends to quickly reestablish connectivity, restoring the movement of material and organisms between upstream and downstream river reaches; (4) geographic context, river history, and land use significantly influence river restoration trajectories and recovery potential because they control broader physical and ecological processes and conditions; and (5) quantitative modeling capability is improving, particularly for physical and broad-scale ecological effects, and gives managers information needed to understand and predict long-term effects of dam removal on riverine ecosystems. Although these studies collectively enhance our understanding of how riverine ecosystems respond to dam removal, knowledge gaps remain because most studies have been short (dam types, watershed conditions, and dam-removal methods in the U.S.

  13. Hoover Dam Learning Packet.

    Science.gov (United States)

    Bureau of Reclamation (Dept. of Interior), Washington, DC.

    This learning packet provides background information about Hoover Dam (Nevada) and the surrounding area. Since the dam was built at the height of the Depression in 1931, people came from all over the country to work on it. Because of Hoover Dam, the Colorado River was controlled for the first time in history and farmers in Nevada, California, and…

  14. Canadian dam safety conference

    International Nuclear Information System (INIS)

    1991-01-01

    A conference was held on the subject of dam safety in Canada. Sessions concerned assessment of existing dam safety under seismic loading, seismic analysis of concrete and embankment dams, selection of seismic criteria, landslides, risk analysis, and floods. Separate abstracts have been prepared for 24 papers presented at the conference

  15. Dams and transnational advocacy: Political opportunities in transnational collective action

    Science.gov (United States)

    Fu, Teng

    Possible arguments to explain the gradual decline in big dam development and its site transferring from developed to developing countries include technical, economic, and political factors. This study focuses on the political argument---the rise of transnational anti-dam advocacy and its impact on state policy-making. Under what conditions does transnational anti-dam advocacy matter? Under what conditions does transnational advocacy change state dam policies (delay, scale down, or cancel)? It examines the role of transnational anti-dam actors in big dam building in a comparative context in Asia. Applying the social movement theory of political opportunity structure (POS) and using the qualitative case-study method, the study provides both within-case and cross-case analyses. Within-case analysis is utilized to explain the changing dynamics of big dam building in China (Three Gorges Dam and proposed Nu/Salween River dam projects), and to a lesser extent, Sardar Sarovar Project in India and Nam Theun 2 Dam in Laos. Different domestic and international POS (DPOS and IPOS) impact the strategies and outcomes of anti-dam advocacies in these countries. The degree of openness of the POS directly affects the capacity of transnational efforts in influencing state dam policies. The degree of openness or closure is measured by specific laws, institutions, discourse, or elite allies (or the absence of these) for the participation of non-state actors on big dam issues at a particular moment. This degree of openness is relative, varying over time, across countries and regions. This study finds that the impact of transnational anti-dam activism is most effective when both DPOS and IPOS are relatively open. Transnational anti-dam advocacy is least effective in influencing state dam policies when both DPOS and IPOS are relatively closed. Under a relatively open DPOS and closed IPOS, transnational anti-dam advocacy is more likely to successfully change state dam policies and even

  16. Rehabilitation at Olympic Dam

    International Nuclear Information System (INIS)

    Chandler, W.P.; Middleton, B.A.

    1986-01-01

    Rehabilitation work on areas denuded of vegetation during the exploration phase of the Olympic Dam project was used to test various methods for regeneration of vegetation cover in the arid zone. The test work carried out on drill pads and access tracks has indicated that, with adequate site preparation, natural regeneration is the most economical and effective method to ensure post-operational stability of the affected land-forms. An on-going monitoring regime, utilising a computer data base, has been set up to allow year-to-year comparison of rehabilitation effectiveness. The database also provides a catalogue of initial colonising plants and a measure of variations in species diversity with time

  17. Tailings dams from the perspective of conventional dam engineering

    International Nuclear Information System (INIS)

    Szymanski, M.B.

    1999-01-01

    A guideline intended for conventional dams such as hydroelectric, water supply, flood control, or irrigation is used sometimes for evaluating the safety of a tailings dam. Differences between tailings dams and conventional dams are often substantial and, as such, should not be overlooked when applying the techniques or safety requirements of conventional dam engineering to tailings dams. Having a dam safety evaluation program developed specifically for tailings dams is essential, if only to reduce the chance of potential errors or omissions that might occur when relying on conventional dam engineering practice. This is not to deny the merits of using the Canadian Dam Safety Association Guidelines (CDSA) and similar conventional dam guidelines for evaluating the safety of tailings dams. Rather it is intended as a warning, and as a rationale underlying basic requirement of tailings dam emgineering: specific experience in tailings dams is essential when applying conventional dam engineering practice. A discussion is included that focuses on the more remarkable tailings dam safety practics. It is not addressed to a technical publications intended for such dams, or significantly different so that the use of conventional dam engineering practice would not be appropriate. The CDSA Guidelines were recently revised to include tailings dams. But incorporating tailings dams into the 1999 revision of the CDSA Guidelines is a first step only - further revision is necessary with respect to tailings dams. 11 refs., 2 tabs

  18. Do we need construct more dams?

    Science.gov (United States)

    Chen, J.; Shi, H.

    2013-12-01

    This paper reviews global dam development in association with the growths of global population, economy, and energy consumption in the past several decades, and also evaluates contributions of dam development to future world sustainable development. Eventually, this paper answers whether we need more dams in the future or not. The world population has rapidly increased from 1.6 billion in 1900, 2.5 billion in 1950, 6.1 billion in 2000, to 7.0 billion in 2011, and is projected to reach 9.5 billion in 2050; similarly, the world economy has dramatically expanded. To maintain socioeconomic development, the consumption of water, food and energy has increased rapidly as well. However, the total volume of available water resource over the world is limited, the food production largely depends on water supply, and the main energy sources are still oil, coal and gas at present, which are regarded as non-renewable resources. Accordingly, it is expected that we will face serious problems to deal with the challenges of water crisis, food security and energy shortage in the near future. In order to enhance the capability of regulating water resource, a great number of global dams (and related reservoirs) have been constructed in the last one hundred years; currently, almost all large rivers over the world have been regulated by dams. The reservoirs can supply sufficient water for irrigated land to ensure food production, and the associated hydropower stations can generate electricity. This article collects the dam data from the ICOLD (International Commission on Large Dams) and GRanD (Global Reservoir and Dam) databases, and some socioeconomic data, including population, economy, and consumptions of water, food and energy over the world. Analysis of these data reveals that global dam development has a great impact on the world sustainable development. Further, it is concluded that we need further dam development to maintain our future development.

  19. 75 FR 74700 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2010-12-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No.: 2183-078] Grand River Dam... Dam Authority. e. Name of Project: Markham Ferry Hydroelectric Project. f. Location: The project is..., Grand River Dam Authority, P.O. Box 409, Vinita, Oklahoma 74301-0409, (918) 256-5545 or by e-mail...

  20. Downstream passage of fish larvae and eggs through a small-sized reservoir, Mucuri river, Brazil

    Directory of Open Access Journals (Sweden)

    Paulo S. Pompeu

    2011-12-01

    Full Text Available In South America, one important symptom of the failure of fish passages to sustain fish migratory recruitment is the inability of eggs and larvae to reach the nurseries. This is especially so when the breeding areas are located upstream of a reservoir, and the floodplain is downstream of the dam. Therefore, the transport of fish larvae and eggs across reservoir barriers is a key factor in the development of effective conservation strategies. In this paper, we evaluate the potential for migratory fish larvae and egg transportation across a small size reservoir in eastern Brazil. We sampled fish daily between 15th October 2002 and 15th February 2003 (spawning period in the Mucuri River, immediately upstream of the reservoir and downstream of the Santa Clara Power Plant dam. Our study was the first to indicate the possibility of successful larval passage through the reservoir of a hydroelectric reservoir and dam in South America, and showed that the passage of migratory fish larvae was associated significantly with residence time of water in the reservoir. The relatively short water residence time and elevated turbidity of the Santa Clara's reservoir waters during the rainy season certainly contributed to the successful passage, and can be considered as key factors for a priori evaluations of the feasibility of a downstream larval passage.

  1. Lac Courte Oreilles Hydro Dam Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Weaver, Jason [Lac Courte Oreilles, Hayward, WI (United States); Meyers, Amy [Kiser Hydro, LLC, Norway, MI (United States)

    2014-12-31

    The main objective of this project was to investigate upgrading the existing hydro power generating system at the Winter Dam. The tribe would like to produce more energy and receive a fair market power purchase agreement so the dam is no longer a drain on our budget but a contributor to our economy. We contracted Kiser Hydro, LLC Engineering for this project and received an engineering report that includes options for producing more energy with cost effective upgrades to the existing turbines. Included in this project was a negotiation of energy price sales negotiations.

  2. 76 FR 9341 - Grand River Dam Authority; Notice of Application Accepted for Filing, Soliciting Comments...

    Science.gov (United States)

    2011-02-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1494-391] Grand River Dam.... Project No.: 1494-391. c. Date Filed: January 7, 2011. d. Applicant: Grand River Dam Authority (GRDA). e... Contact: Tamara E. Jahnke, Assistant General Counsel, Grand River Dam Authority, P.O. Box 409, Vinita, OK...

  3. 77 FR 58820 - Grand River Dam Authority; Notice of Application Accepted for Filing, Soliciting Comments...

    Science.gov (United States)

    2012-09-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 1494-410] Grand River Dam.... Project No: 1494-410. c. Date Filed: August 6, 2012. d. Applicant: Grand River Dam Authority. e. Name of... River Dam Authority, P.O. Box 409, Vinita, Oklahoma 74301, (918) 256-5545. i. FERC Contact: Lorance...

  4. The role of dams in development

    International Nuclear Information System (INIS)

    Cakmak, C.

    2001-01-01

    Although the amounts of water resources are enough for the entire world, the distribution of them in time and space shows uneven pattern. The water need is increasing with heavy industrial and agricultural requirements, while available water in the world remains as a fixed source. Economic growth, socio-cultural, and environmental developments are being realized following these changes. In order to achieve sustainable management of water resources, these changes have to be taken into consideration in water-related development projects. Demand for water is steadily increasing through out the world, even though the fresh water resources are limited and unevenly distributed, during the past three centuries, the amount of water withdrawn from fresh water resources has increased by a factor of 35, whereas world population by a factor 8. The engineering of dams, which provides regular water from reservoirs of dams to be used in case of demand pattern, is a vital part of the civilization. Dams have played a key rote in the development since the third millennium B C when the first great civilizations evolved on major rivers, such as Tigris-Euphrates, the Nile and the Indus. From these early times dams were built for flood control, water supply, irrigation and navigation. Dams also had been built to produce motive power and electricity since the industrial revolution. Development priorities changed, experience accumulated with the construction and operation of dams. Although the importance of water is well known in the human life and civilization around the world, still various groups argue that expected economic benefits are not being produced and that major environmental, economic and social costs are not being taken into account. By the end of 20th century, there were 45000 large dams in over 150 countries. According to the same classification there are 625 large dams in Turkey. All over the world, 50 % of the large dams were built mainly for irrigation. It is estimated

  5. Mitigation for the Construction and Operation of Libby Dam, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James L.; Marotz, Brian L.; DeShazer, Jay (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2003-06-01

    Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possible conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to ''protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries...'' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May, 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to

  6. Damning The Dam: The St. Louis District Corps of Engineers and The Controversy Over the Meramec Basin Project from its Inception to Its Deauthorization

    Science.gov (United States)

    1992-01-01

    generating support dissipated further when W.W. Homer himself publicly denied that the Cooperative Committee intended to endorse high dams as the best...High Darns Subcommittee of the Agricultural Bureau of the St. Louis Chamber of Commerce, A prill, 1946, signed by Joseph R. Cosgrove , Chairman...Kenneth Wangelin, U.S. District Court, Eastern District of Missouri, denied the plaintiff s petition without preju- dice in light of the fact that the

  7. A Passage into Critical Theory.

    Science.gov (United States)

    Lynn, Steven

    1990-01-01

    Shows how a single passage might be handled by New Criticism, structuralism, deconstructionism, psychological criticism, and feminist criticism. Concludes that a plurality of critical approaches is better than a unity of approach. (RS)

  8. Dams: Pros and Cons

    African Journals Online (AJOL)

    Steve

    Many Dams have been constructed in different parts of the world and for different purposes. While these dams have in most cases served the reason for their construction, the resultant environmental impact have been a subject of concern. The creation of a reservoir not only changes the ecology and hydrology of the ...

  9. Swimbladder abnormalities in piapara (Leporinus obtusidens captured downstream of the Funil Dam

    Directory of Open Access Journals (Sweden)

    Viviane de Oliveira Felizardo

    Full Text Available Fish damage in hydroelectric stations has been extensively reported, but further investigations focusing on Brazilian migratory species, especially large fish, are needed. The present study describes swimbladder abnormalities in piapara Leporinus obtusidens, a migratory physoclistous species, collected downstream from the Funil Hydroelectric station dam, Minas Gerais, Brazil. The 117 specimens collected were dissected for swimbladder evaluation in the coelomic cavity. The abnormalities detected in 14 of the fish (12% were swimbladder rupture with exteriorization (N = 12 and formation of sac-like projections (N = 2. The specimens that had swimbladder abnormalities weighed over 1300 g for both sexes. These abnormalities may be caused by bladder infections, however, inflammation process were not detected in these fish. The presence of anomalies in swimbladder suggests that the individuals were subjected to sudden depressurization, possibly related to passage through the turbines. Further comparative studies are needed to corroborate this hypothesis.

  10. NOAA TIFF Image - 1 m Backscatter Mosaic of the Virgin Passage and the St. John Shelf, U.S. Virgin Islands, Project NF-10-03, 2010, UTM 20 WGS84

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This image represents a 1 meter resolution backscatter mosaic of the Virgin Passage in the US Virgin Islands. NOAA's NOS/NCCOS/CCMA Biogeography Team, in...

  11. NOAA TIFF Image - 1 m Backscatter Mosaic of the Virgin Passage and the St. John Shelf, U.S. Virgin Islands, Project NF-10-03, 2010, UTM 20 WGS84 (NCEI Accession 0131854)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This image represents a 1 meter resolution backscatter mosaic of the Virgin Passage in the US Virgin Islands. NOAA's NOS/NCCOS/CCMA Biogeography Team, in...

  12. 75 FR 7469 - Whitman River Dam, Inc.; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2010-02-19

    ... Energy Regulatory Commission Whitman River Dam, Inc.; Notice of Intent To File License Application...: Whitman River Dam, Inc. e. Name of Project: Crocker Pond Project. f. Location: The project would be located at the existing Crocker Pond Dam, on the Whitman River, in Worcester County, Massachusetts. The...

  13. 75 FR 16090 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2010-03-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1494-384] Grand River Dam.... Applicant: Grand River Dam Authority. e. Name of Project: Pensacola Project. f. Location: The proposed non... Council, Grand Dam River Authority, P.O. Box 409, Vinita, Oklahoma 74301, (918) 256-5545. i. FERC Contact...

  14. 78 FR 30914 - Grand River Dam Authority Notice of Application for Temporary Variance of License and Soliciting...

    Science.gov (United States)

    2013-05-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1494-416] Grand River Dam.... Applicant: Grand River Dam Authority. e. Name of Project: Pensacola Hydroelectric Project. f. Location: The... Executive Officer, Grand River Dam Authority, P.O. Box 409, Vinita, OK 74301; telephone: (918) 256-5545. i...

  15. Olympic Dam - the first decade

    International Nuclear Information System (INIS)

    Newton, A.W.; Wilson, M.A.; Harris, J.

    1988-01-01

    Most aspects of the pre-production phase of the Olympic Dam Project, from commencement of exploration in May 1975 through to commitment to development in December 1985 are documented here. The discovery by Western Mining Corporation Ltd of copper mineralisation on Roxby Downs Station in July 1975 has led to one of the more intensive base-metal exploration programmes undertaken in Australia. Comprehensive exploration, evaluation and feasibility studies between 1975 and 1985 have delineated a probable 450 million tonnes of higher grade ore containing 2.5% copper, 0.8 kg/t uranium oxide, 0.6 g/t gold and 6.0 g/t silver. The total resource is estimated at 2 billion tonnes containing 1.6% copper, 0.6 kg/t uranium oxide, 0.6 g/t gold and 3.5 g/t silver. At 31 December 1985, over 540 km of surface and underground drilling had been completed, comprising over 700 surface drillholes totalling 234 km of core and 218 km of open-hole drilling, and about 900 underground diamond-drillholes totalling 90 km. The Whenan Shaft had been sunk to 500 m and driving on three levels totalled almost 10 km. More than one million tonnes of ore and mullock were raised during development. A pilot treatment plant commissioned on site produced concentrates, matte and blister copper, and ammonium diuranate. Following a technical study of the Olympic Dam Project, completed in March 1985, and a subsequent economic feasibility study, it was announced on 11 June 1985 that the initial project was considered to be commercially viable. On 8 December 1985, the joint venturers, Western Mining Corporation Holdings Ltd (51%) and the BP Group (49%), announced their commitment to the Project. An appendix lists the important events that occurred between January 1986 and December 1987 in bringing Olympic Dam to the production state. 26 refs., 17 figs., 5 tabs., ills

  16. Fish Passage Assessment: Big Canyon Creek Watershed, Technical Report 2004.

    Energy Technology Data Exchange (ETDEWEB)

    Christian, Richard

    2004-02-01

    This report presents the results of the fish passage assessment as outlined as part of the Protect and Restore the Big Canyon Creek Watershed project as detailed in the CY2003 Statement of Work (SOW). As part of the Northwest Power Planning Council's Columbia Basin Fish and Wildlife Program (FWP), this project is one of Bonneville Power Administration's (BPA) many efforts at off-site mitigation for damage to salmon and steelhead runs, their migration, and wildlife habitat caused by the construction and operation of federal hydroelectric dams on the Columbia River and its tributaries. The proposed restoration activities within the Big Canyon Creek watershed follow the watershed restoration approach mandated by the Fisheries and Watershed Program. Nez Perce Tribal Fisheries/Watershed Program vision focuses on protecting, restoring, and enhancing watersheds and treaty resources within the ceded territory of the Nez Perce Tribe under the Treaty of 1855 with the United States Federal Government. The program uses a holistic approach, which encompasses entire watersheds, ridge top to ridge top, emphasizing all cultural aspects. We strive toward maximizing historic ecosystem productive health, for the restoration of anadromous and resident fish populations. The Nez Perce Tribal Fisheries/Watershed Program (NPTFWP) sponsors the Protect and Restore the Big Canyon Creek Watershed project. The NPTFWP has the authority to allocate funds under the provisions set forth in their contract with BPA. In the state of Idaho vast numbers of relatively small obstructions, such as road culverts, block thousands of miles of habitat suitable for a variety of fish species. To date, most agencies and land managers have not had sufficient, quantifiable data to adequately address these barrier sites. The ultimate objective of this comprehensive inventory and assessment was to identify all barrier crossings within the watershed. The barriers were then prioritized according to the

  17. Tailings dams safety - implications for the dam safety community

    International Nuclear Information System (INIS)

    Vick, S.G.

    1999-01-01

    In the context of the impact of privatization and globalization on traditional dam safety practice and the Canadian experience of the environmental dimension of dam failures, various aspects of tailings dam safety have much to offer the wider dam safety community. General design principles for tailings dams are not described, rather an attempt is made to frame some contemporary issues of tailings dam safety in ways that bring out their relevance in a broader dam safety context. Lessons applicable to future dam safety practice in related areas are examined, and the dam safety traditions of the mining, hydroelectric and related industries in Canada are brought together by illustrating some of the common elements and concerns they share. It is becoming evident that future dam safety activities for the hydroelectric, water supply and related dams will be carried out in a more privatized and globalized context by organizations less acquainted with traditional dam safety practices than in the past. If so, then tailings dam experience can be a pathfinder for how and why dam safety needs to be addressed in a corporate setting. It shows that the perceived effects of dam failures, environmental and otherwise, influence corporate damowners in ways that can amplify manyfold the objective consequences that dam safety assessments usually address. Dam safety professionals might do well to better understand and effectively communicate the financial and organizational impacts of dam failure on the corporate entity in ways that go beyond the traditional assessment of downstream hazard and failure consequences. Dam safety efforts can come to be seen less as imposed burdens of dam ownership and more as activities consistent with shareholder accountability and corporate self-interest. The Canadian mining industry, in adopting this perspective, is confirming that support for dam safety activities from the highest corporate level is essential for implementing them throughout the

  18. The Manantali dam. Synthesis report

    International Nuclear Information System (INIS)

    Dickmann, M.; Sieburger, Dr; Ficatier, M.; Naudet, M.; Schmidt, M.; Seve, M.

    2009-01-01

    This report proposes an ex-post assessment of the Manantali dam on the Senegal river and of the related investments in Senegal, in Mauritania and in Mali. After a presentation of the methodology adopted for this assessment study performed by several organisms, the report describes the context and the concerned sectors: project costs and funding, framework for irrigated agriculture, and framework for energy. It discusses the relevance of the project with respect to irrigated agriculture and to energy. It assesses the project performance in terms of efficiency and of viability, and with respect to environmental aspects. It presents an overview of the different direct and indirect sector-based partners which are involved in energy or rural development. The next part proposes an assessment of the global impact of the project on development as far as irrigated agriculture, the energy sector, and regional cooperation and integration are concerned. A set of lessons learned and recommendations are then formulated

  19. Upstream Atlantic salmon (Salmo salar) passage

    International Nuclear Information System (INIS)

    Clay, C.H.

    1993-01-01

    Upstream salmon passage though a dam is discussed with respect to three main components: the fishway entrance, the fishway, and the exit. Design considerations and alternative types of components are presented. For fishway entrances, an important consideration is the positioning of the entrance as far upstream as the fish can swim with respect to obstacles. For powerhouses using water diverted from a river, the problem of leading fish past the powerhouse may be overcome by either installing a tailrace barrier or increasing the flow until the home stream odor is sufficient to attract fish. Swimming ability should be the first consideration in fishway design. Fishways with 50 cm drops per pool would be satisfactory in most cases. The problem of headwater fluctuation is overcome through careful fishway selection. Fish locks, hoists, and elevators are other alternatives to pool/weir fishways. The location for a fish exit must be decided on the basis of whether the fishway will be used only for upstream migrations. 5 refs., 1 fig., 1 tab

  20. Modeling the hydrophysical soil properties as a part of self-regulated flood dams projection in gis-environment for sustainable urban development

    Science.gov (United States)

    Nikonorov, Aleksandr; Terleev, Vitaly; Badenko, Vladimir; Mirschel, Wilfried; Abakumov, Evgeny; Ginevsky, Roman; Lazarev, Viktor; Togo, Issa; Volkova, Yulia; Melnichuk, Aleksandr; Dunaieva, Ielizaveta; Akimov, Luka

    2017-10-01

    The problem of flood protection measures are considered in the paper. The regulation of river flow by the system of Self-Regulated Flood Dams (SRFD) is analyzed. The method of SRFD modeling in GIS environment is proposed. The question of the ecological aspect of the SRFD management is considered based on the hydrophysical properties of the soil. The improved Mualem-Van Genuchted method is proposed for the evaluation of the possible SRFD location influence on the soil of flooded territory – the temporary reservoirs. The importance and utility of the proposed complex method is stated.

  1. Dam safety operating guidelines

    International Nuclear Information System (INIS)

    Elsayed, E.; Leung, T.; Kirkham, A.; Lum, D.

    1990-01-01

    As part of Ontario Hydro's dam structure assessment program, the hydraulic design review of several river systems has revealed that many existing dam sites, under current operating procedures, would not have sufficient discharge capacity to pass the Inflow Design Flood (IDF) without compromising the integrity of the associated structures. Typical mitigative measures usually considered in dealing with these dam sites include structural alterations, emergency action plans and/or special operating procedures designed for extreme floods. A pilot study was carried out for the Madawaska River system in eastern Ontario, which has seven Ontario Hydro dam sites in series, to develop and evaluate the effectiveness of the Dam Safety Operating Guidelines (DSOG). The DSOG consist of two components: the flood routing schedules and the minimum discharge schedules, the former of which would apply in the case of severe spring flood conditions when the maximum observed snowpack water content and the forecast rainfall depth exceed threshold values. The flood routing schedules would identify to the operator the optimal timing and/or extent of utilizing the discharge facilities at each dam site to minimize the potential for dam failures cased by overtopping anywhere in the system. It was found that the DSOG reduced the number of structures overtopped during probable maximum flood from thirteen to four, while the number of structures that could fail would be reduced from seven to two. 8 refs., 4 figs., 3 tabs

  2. Application of electrical resistivity imaging (ERI) to a tailings dam project for artisanal and small-scale gold mining in Zaruma-Portovelo, Ecuador

    Science.gov (United States)

    Zarroca, Mario; Linares, Rogelio; Velásquez-López, Patricio C.; Roqué, Carles; Rodríguez, Roberto

    2015-02-01

    Thanks to advances in geoelectrical resistivity method over the past two decades, researchers can now gather massive geophysical data sets encompassing long distances and depths, at reasonable cost. The enhanced resolution and spatial coverage of these techniques make them, now, very attractive for use in geological engineering applications, an area for which they were previously charged to be unsuitable. The study shows the capability of electrical resistivity imaging (ERI) to identify key subsoil features that might affect a future tailings dam slated for construction at the Zaruma-Portovelo Mining District, Ecuador. The ERI profiles were gathered and processed with the aim of obtaining resistivity images of a sufficiently resolution for geotechnical use. A geophysical model was created based on these images. The resistivity images were calibrated according to geomorphological, hydrogeological and geotechnical data in order to translate geophysical information into rational geological information. The ERI results, supported by the geomorphological and geotechnical work, suggested that the rock massif is composed of weathering horizons of different rock qualities, slopes are affected by sliding surfaces and these features exert a control on the groundwater flow. These results indicated that the original site selected to construct the dam dike was susceptible to land sliding and an alternative construction site was suggested. Based on the same results, a geomorphological-hydrogeological conceptual model for layered weathered granitic massif in mountainous areas was also proposed.

  3. Strategies of Successful Anti-Dam Movements: Evidence from Myanmar and Thailand

    NARCIS (Netherlands)

    Kirchherr, J.W.

    2018-01-01

    Scholars are rarely able to examine anti-dam movements that result in project suspensions or cancellations since these cases are rare empirically. Yet, they are central to understanding how anti-dam movements can succeed. This paper analyzes the movements against Myanmar’s Myitsone Dam and

  4. 43 CFR 431.7 - Administration and management of the Colorado River Dam Fund.

    Science.gov (United States)

    2010-10-01

    ... Colorado River Dam Fund. 431.7 Section 431.7 Public Lands: Interior Regulations Relating to Public Lands... management of the Colorado River Dam Fund. Reclamation is responsible for the repayment of the Project and the administration of the Colorado River Dam Fund and the Lower Colorado River Basin Development Fund...

  5. 77 FR 40607 - Whitman River Dam, Inc.; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2012-07-10

    ... Dam, Inc.; Notice of Availability of Environmental Assessment In accordance with the National... for an original license for the Crocker Dam Hydroelectric Project, to be located on the Whitman River... Energy Regulatory Commission, 888 First Street, Washington, DC 20426. Please affix ``Crocker Dam...

  6. 43 CFR 418.23 - Diversion of Rock Dam Ditch water.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Diversion of Rock Dam Ditch water. 418.23... Operations and Management § 418.23 Diversion of Rock Dam Ditch water. Project water may be diverted directly to Rock Dam Ditch from the Truckee Canal only when diversions cannot be made from the outlet works of...

  7. Allegheny County Dam Locations

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — This dataset shows the point locations of dams in Allegheny County. If viewing this description on the Western Pennsylvania Regional Data Center’s open data portal...

  8. Biochemical Markers in Meconium Passage

    Directory of Open Access Journals (Sweden)

    Özlem Gün Eryýlmaz

    2013-03-01

    Full Text Available        The understanding of the mechanism and pathophysiology pertaining to intrauterine release of meconium is limited. An undesired condition of delivery, meconium passage can lead to respiratory difficulty and meconium aspiration syndrome. Since its mechanism has not been fully revealed, early prediction and prevention is not possible.In this review article, an effort is made to gather the most current information on the mechanism of meconium release. Also, based on the probable pathologic mechanisms, an explanation is provided on the potential markers that can aid in early detection of meconium passage.

  9. DAM-LAKEFRONT PLAZA: Revitalization of an Agriculture Reservoir Dam in Kashar-Tirana/Albania

    Directory of Open Access Journals (Sweden)

    Valbona Koçi

    2014-12-01

    Full Text Available The Dam-Lakefront Plaza in Kashar-Tirana/Albania is a research project that proposes not only the re-consideration and reinforcement of the artificial Reservoirs Dams built during Socialism in Albania, but envisions the maintenance of dams and revitalization of the lakeside area promoting the public-private collaboration. In addition, it envisions the generation of qualitative and lively public spaces in sub-urban areas as well. Admitting the artificial lakes as specific nodes of man-made infrastructure in the landscape, and consequently the dams (together with the drainage channels as important hydrotechnic elements of the flood protection infrastructure, this research intends to elaborate on one type of landscape infrastructure - the vertical screens, offering a mediation between the natural and built landscape.

  10. Monitoring and Evaluation of Smolt Migration in the Columbia Basin : Volume IX : Evaluation of the 2001 Predictions of the Run-Timing of Wild and Hatchery-Reared Migrant Salmon and Steelhead Trout Migrating to Lower Granite, Rock Island, McNary, and John Day Dams using Program RealTime.

    Energy Technology Data Exchange (ETDEWEB)

    Burgess, Caitlin; Skalski, John R.

    2001-12-01

    Program RealTime provided tracking and forecasting of the 2001 inseason outmigration via the internet for eighteen PIT-tagged stocks of wild salmon and steelhead to Lower Granite and/or McNary dams and eleven passage-indexed stocks to Rock Island, McNary, or John Day dams. Nine of the PIT-tagged stocks tracked this year were new to the project. Thirteen ESUs of wild subyearling and yearling chinook salmon and steelhead, and one ESU of hatchery-reared sockeye salmon were tracked and forecasted to Lower Granite Dam. Eight wild ESUs of subyearling and yearling chinook salmon, sockeye salmon and steelhead were tracked to McNary Dam for the first time this year. Wild PIT-tagged ESUs tracked to Lower Granite Dam included yearling spring/summer chinook salmon release-recovery stocks (from Bear Valley Creek, Catherine Creek, Herd Creek, Imnaha River, Johnson Creek, Lostine River, Minam River, South Fork Salmon River, Secesh River, and Valley Creek), PIT-tagged wild runs-at-large of yearling chinook salmon and steelhead, and a PIT-tagged stock of subyearling fall chinook salmon. The stock of hatchery-reared PIT-tagged summer-run sockeye salmon smolts outmigrating to Lower Granite Dam, consisted this year of a new stock of fish from Alturas Lake Creek, Redfish Lake Creek Trap and Sawtooth Trap. The passage-indexed stocks, counted using FPC passage indices, included combined wild- and hatchery-reared runs-at-large of subyearling and yearling chinook, coho, and sockeye salmon, and steelhead migrating to Rock Island and McNary dams, and, new this year, combined wild and hatchery subyearling chinook salmon to John Day Dam. Unusual run-timing and fish passage characteristics were observed in this low-flow, negligible-spill migration year. The period for the middle 80% of fish passage (i.e., progress from the 10th to the 90th percentiles) was unusually short for nine out of ten PIT-tagged yearling spring/summer chinook salmon stocks tracked to Lower Granite Dam. It was the

  11. Isotope technique in JPS dam surveillance: its potential

    International Nuclear Information System (INIS)

    Sabri Hassan

    2006-01-01

    Controlling seepage is one of the most important requirements for safe dams. Any leakage at an earth embankment may be potentially dangerous since rapid internal erosion may quickly enlarge an initially minor defect. Thus dam owners need to have thorough surveillance programs that can forewarn of impending problems from seepage or other factors influencing the safety of dams. In carrying out dam surveillance works, all possible efforts should be considered and foreseeing the potential of isotope technique, JPS (Department of Irrigation and Drainage, Malaysia) and MINT (Malaysian Institute for Nuclear Technology Research) participated actively in the UNDP/RCA/IAEA program under RAS/8/093 project sponsored by the International Atomic Energy Agency (IAEA). Through these activities, it was noted that the technique demonstrated very promising potentials such as in assisting dam site selections, site investigations, watershed studies, dam and reservoir design, leakage investigations and sediments related issues, the two latter ones being relatively critical during the operational life of the dam. Establishment of baseline isotopic characteristics (or fingerprint), hydrochemistry, electrical conductivity and temperature profiles is underway for all JPS dams to be later utilized in diagnosing seepage related issues it is suggested that application of this technique be extended to other dam owners nationwide. (Author)

  12. Hydroelectric dams need billions for rehab

    International Nuclear Information System (INIS)

    Carr, F.H.; Soast, A.

    1993-01-01

    Many of the Corps of Engineers older hydroelectric dams will require major rehabilitation over the next ten years. Preventive maintenance, repair work, and major rehabilitation of the Corp's hydro dams in inadequate because the revenue generated by sales of electricity, by law, is returned to the Treasury. Most multimillion dollar rehabilitation projects require specific approval for funding by Congress and securing it is a long and difficult process. It is hoped the funding problem will soon be addressed by the Clinton administration. Already, nearly one-sixth of the 2,154 Mw of hydro is unavailable because with hydro units are either out of service or operating at less than full capacity

  13. 76 FR 40903 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2011-07-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2524-019] Grand River Dam.... Date Filed: January 21, 2011. d. Applicant: Grand River Dam Authority. e. Name of Project: Salina... Zumwalt-Smith, General Counsel, Grand River Dam Authority, P.O. Box 409, Vinita, OK 73401-0409. Tel: (918...

  14. 77 FR 30518 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2012-05-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1494-403] Grand River Dam.... Project No.: 1494-403. c. Date Filed: April 11, 2012. d. Applicant: Grand River Dam Authority. e. Name of.... Tamara E. Jahnke, Assistant General Counsel, Grand River Dam Authority, P.O. Box 409, Vinita, Oklahoma...

  15. 76 FR 7831 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2011-02-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2183-080] Grand River Dam.... Date Filed: December 15, 2010. d. Applicant: Grand River Dam Authority. e. Name of Project: Markham... Contact: Gretchen Zumwalt-Smith, General Counsel, Grand River Dam Authority, P.O. Box 409, Vinita, OK...

  16. Dam safety guidelines

    International Nuclear Information System (INIS)

    Anderson, I.; Raska, C.

    1999-01-01

    The objectives of this report are (1) to define the requirements and outline the guidelines so that the safety of existing dams can be investigated and identified in a consistent and adequate manner across Canada, (2) to enable the consistent evaluation of dam safety deficiencies leading to the construction of improvements which contribute to dam safety, and (3) to provide a basis for dam safety legislation and regulation. The document contains statements of safety requirements, explanatory guidelines and commentaries. These clarify and expand upon some of the requirements and guidelines, and discuss alternative approaches to meeting the safety requirements. The report is divided into 12 sections which address criteria for earthquakes, floods and emergency preparedness. Geotechnical considerations and the effects of the reservoir environment are also discussed. These guidelines are not intended as design specifications for dam safety evaluation, design, construction or rehabilitation. From time to time, portions of these guidelines will be updated and issued to CDSA members. The user is responsible for ensuring that the most up-to-date version is being used. refs, tabs

  17. Computational Fluid Dynamics Modeling of the John Day Dam Tailrace

    Energy Technology Data Exchange (ETDEWEB)

    Rakowski, Cynthia L.; Perkins, William A.; Richmond, Marshall C.; Serkowski, John A.

    2010-07-08

    US Army Corps of Engineers - Portland District required that a two-dimensional (2D) depth-averaged and a three-dimensional (3D) free-surface numerical models to be developed and validated for the John Day tailrace. These models were used to assess potential impact of a select group of structural and operational alternatives to tailrace flows aimed at improving fish survival at John Day Dam. The 2D model was used for the initial assessment of the alternatives in conjunction with a reduced-scale physical model of the John Day Project. A finer resolution 3D model was used to more accurately model the details of flow in the stilling basin and near-project tailrace hydraulics. Three-dimensional model results were used as input to the Pacific Northwest National Laboratory particle tracking software, and particle paths and times to pass a downstream cross section were used to assess the relative differences in travel times resulting from project operations and structural scenarios for multiple total river flows. Streamlines and neutrally-buoyant particles were seeded in all turbine and spill bays with flows. For a Total River of 250 kcfs running with the Fish Passage Plan spill pattern and a spillwall, the mean residence times for all particles were little changed; however the tails of the distribution were truncated for both spillway and powerhouse release points, and, for the powerhouse releases, reduced the residence time for 75% of the particles to pass a downstream cross section from 45.5 minutes to 41.3 minutes. For a total river of 125 kcfs configured with the operations from the Fish Passage Plan for the temporary spillway weirs and for a proposed spillwall, the neutrally-buoyant particle tracking data showed that the river with a spillwall in place had the overall mean residence time increase; however, the residence time for 75% of the powerhouse-released particles to pass a downstream cross section was reduced from 102.4 min to 89 minutes.

  18. Dam construction in salt rock

    International Nuclear Information System (INIS)

    Stockmann, N.; Beinlich, A.; Flach, D.; Jockwer, N.; Klarr, K.; Krogmann, P.; Miehe, R.; Schmidt, M.W.; Schwaegermann, H.F.; Walter, F.; Yaramanci, U.

    1991-11-01

    Barriers are a major component of the satefy concept for the Gorleben repository. The construction and performance of dams are currently tested within the framework of a project carried out in the Asse salt mine. A measuring programme has been established to give evidence of the sealing capacities of a barrier consisting of an abatement, long-term sealing material, and a hydraulic sealing system. Tests are to be made to verify the barrier's performance for shorter of long time periods (up to about 500 years). The tests are assisted by computed models established for the project. The long-term safety aspects to be studied include such conditions as permeability changes due to mechanical impacts, circulation conditions at the roadside, and the serviceable life and efficiency of the sealing components. (DG) [de

  19. 78 FR 5798 - Ceresco Hydroelectric Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2013-01-28

    ... Hydroelectric Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 19, 2012, Ceresco Hydroelectric Dam, LLC...), proposing to study the feasibility of the Ceresco Hydroelectric Project (Ceresco Project or project) to be...

  20. Introduction of an Emergency Response Plan for flood loading of Sultan Abu Bakar Dam in Malaysia

    Science.gov (United States)

    Said, N. F. Md; Sidek, L. M.; Basri, H.; Muda, R. S.; Razad, A. Z. Abdul

    2016-03-01

    Sultan Abu Bakar Dam Emergency Response Plan (ERP) is designed to assist employees for identifying, monitoring, responding and mitigation dam safety emergencies. This paper is outlined to identification of an organization chart, responsibility for emergency management team and triggering level in Sultan Abu Bakar Dam ERP. ERP is a plan that guides responsibilities for proper operation of Sultan Abu Bakar Dam in respond to emergency incidents affecting the dam. Based on this study four major responsibilities are needed for Abu Bakar Dam owing to protect any probable risk for downstream which they can be Incident Commander, Deputy Incident Commander, On-Scene Commander, Civil Engineer. In conclusion, having organization charts based on ERP studies can be helpful for decreasing the probable risks in any projects such as Abu Bakar Dam and it is a way to identify and suspected and actual dam safety emergencies.

  1. Investigation on the Causes of Cracking in Earth Dams (Case study: Mahmood-Abad Earth Dam

    Directory of Open Access Journals (Sweden)

    H. Rahimi

    2016-09-01

    river base beneath the dam structure. In fact , this layer has not been considered in the analysis as well in design. Because of fully saturated condition of this layer in an operation period of dam it might subjected to liquefaction during the happening of the earthquake. Evaluation of liquefaction potential of this layer based on Seed and Idriss (1971 diagram showed probability of this phenomenon. To prove this hypothesis, the stability analysis had been conducted in two different conditions by including the thin sandy layer and without considering the mentioned layer. The analysis showed in the case of absence of sandy layer the required safety factor was satisfied, but including the sandy layer leads cause the safety factor dropped to 0.84 that means accruing of liquefaction in the thin layer would lead to structural instability of the studied dam. The simulation of the behavior of dam by employing the accrued earthquake acceleration confirmed the liquefaction has been accrued in the thin sandy layer. The results of finite element simulation showed the depth of the cracks on the crest is about 2 meters and also the upstream slope has slipped about 81 mm to the reservoir of the dam. These results was consistent with the observed values. To overcome the next risks, also to repair the damaged parts of the dam, 3 different methods had been proposed. The curing technics was deploying of the reservoir and removing of the damage part of the dam and as well the thin sandy layer and reconstructed that part of dam, Deploying of reservoir of the dam and adjusting the slope of the upper shoulder to stable condition and at least repairing the developed cracks by injecting cement slurry and tolerate the current condition without imposition any additional costs to the project. The third method has been selected, but for any probable risky condition monitoring of the dam has been advised. Conclusion: Based on the overall results of the investigations, it was concluded that cracking

  2. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 1994 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Brimmer, Arnold F.

    1994-10-01

    This project monitored the daily passage of chinook salmon Oncorhynchus tshawytscha and steelhead trout O. mykiss smolts during the 1994 spring outmigration at migrant traps on the Snake River, Clearwater River, and Salmon River. The 1994 snowpack was among the lowest since the beginning of the present drought, and the subsequent runoff was very poor. All hatchery chinook salmon released above Lower Granite Dam were marked with a fin clip in 1994. Total annual (hatchery + wild) chinook salmon catch at the Snake River trap was 1.5 times greater than in 1993. Hatchery and wild steelhead trout catches were similar to 1993. The Snake River trap collected 30 age 0 chinook salmon. Hatchery chinook salmon catch at the Clearwater River trap was 3.5 times higher than in 1993, and wild chinook salmon catch was 4.2 times higher. Hatchery steelhead trout trap catch was less than half of 1993 numbers because the trap was fishing near the north shore during the majority of the hatchery steelhead movement due to flow augmentations from Dworshak. Wild steelhead trout trap catch was 2 times higher than in 1993. The Salmon River trap was operated for about a month longer in 1994 than in 1993 due to extremely low flows. Hatchery chinook salmon catch was 1.4 times greater in 1994 than the previous year. Wild chinook salmon catch was slightly less in 1994. The 1994 hatchery steelhead trout collection did not change significantly from 1993 numbers. Wild steelhead trout collection in 1994 was 59% of the 1993 catch. Fish tagged with Passive Integrated Transponder (PIT) tags at the Snake River trap were interrogated at four dams with PIT tag detection systems (Lower Granite, Little Goose, Lower Monumental, and McNary dams). Because of the addition of the fourth interrogation site (Lower Monumental) in 1993, cumulative interrogation data is not comparable with the prior five years (1988-1992).

  3. Chief Joseph Kokanee Enhancement Project; Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Simmons, M.; Johnson, Robert; McKinstry, C. [Pacific Northwest National Laboratory

    2006-03-01

    The construction of Grand Coulee and Chief Joseph dams on the Columbia River resulted in the complete extirpation of the anadromous fishery upstream of these structures. Today, this area is totally dependent upon resident fish resources to support local fisheries. The resident fishing is enhanced by an extensive stocking program for target species in the existing fishery, including kokanee (Oncorhynchus nerka kennerlyi) and rainbow trout (O. mykiss). The kokanee fishery in Lake Roosevelt has not been meeting the return goals set by fisheries managers despite the stocking program. Investigations of physical and biological factors that could affect the kokanee population found predation and entrainment had a significant impact on the fish population. In 1999 and 2000, walleye (Sander vitreum) consumed between 15% and 9%, respectively, of the hatchery kokanee within 41 days of their release, while results from a study in the late 1990s estimated that entrainment at Grand Coulee Dam could account for up to 30% of the total mortality of the stocked fish. To address the entrainment loss, the Bonneville Power Administration commissioned a study to determine if fish would avoid areas illuminated by strobe lights in the forebay of the third powerplant. This work was conducted by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes). From 2002 through 2004, six strobe lights were suspended in the center of the opening to the third powerplant forebay during summer months. Results from those studies indicated that fish appeared to be attracted to the illuminated area but only at night and when flow conditions within the third powerplant forebay were minimal. However, small but consistent results from these studies indicated that under high flow conditions, fish might be avoiding the lights. The 2005 study was designed to examine whether, under high flow conditions near the penstock

  4. Small dams need better management

    Science.gov (United States)

    Balcerak, Ernie

    2012-03-01

    Many small dams around the world are poorly maintained and represent a safety hazard, according to Pisaniello et al. Better oversight of small dams is needed, the authors argue. The researchers reviewed literature, conducted case studies in four states in Australia, and developed policy benchmarks and best practices for small-dam management. Small dams, often just several meters high and typically privately owned by individual farmers, have historically caused major damage when they fail. For instance, in China in 1975, 230,000 people died when two large dams failed because of the cumulative failure of 60 smaller upstream dams. In the United States, in 1977 the 8-meter-high Kelly Barnes Lake dam failed, killing 39 people. Many other small-dam failures around the world have resulted in casualties and severe ecological and economic damage.

  5. Understanding cell passage through constricted microfluidic channels

    Science.gov (United States)

    Cartas-Ayala, Marco A.; Karnik, Rohit

    2012-11-01

    Recently, several microfluidic platforms have been proposed to characterize cells based on their behaviour during cell passage through constricted channels. Variables like transit time have been analyzed in disease states like sickle cell anemia, malaria and sepsis. Nevertheless, it is hard to make direct comparisons between different platforms and cell types. We present experimental results of the relationship between solid deformable particle properties, i.e. stiffness and relative particle size, and flow properties, i.e. particle's velocity. We measured the hydrodynamic variables during the flow of HL-60 cells, a white myeloid cell type, in narrow microfluidic square channels using a microfluidic differential manometer. We measured the flow force required to move cells of different sizes through microchannels and quantified friction forces opposing cell passage. We determined the non-dimensional parameters that influence the flow of cells and we used them to obtain a non dimensional expression that can be used to predict the forces needed to drive cells through microchannels. We found that the friction force needed to flow HL-60 through a microfluidic channel is the sum of two parts. The first part is a static friction force that is proportional to the force needed to keep the force compressed. The second part is a factor that is proportional to the cell velocity, hence a dynamic term, and slightly sensitive to the compressive force. We thank CONACYT (Mexican Science and Technology Council) for supporting this project, grant 205899.

  6. Estimated Loads of Suspended Sediment and Selected Trace Elements Transported through the Milltown Reservoir Project Area Before and After the Breaching of Milltown Dam in the Upper Clark Fork Basin, Montana, Water Year 2008

    Science.gov (United States)

    Lambing, John H.; Sando, Steven K.

    2009-01-01

    This report presents estimated daily and cumulative loads of suspended sediment and selected trace elements transported during water year 2008 at three streamflow-gaging stations that bracket the Milltown Reservoir project area in the upper Clark Fork basin of western Montana. Milltown Reservoir is a National Priorities List Superfund site where sediments enriched in trace elements from historical mining and ore processing have been deposited since the construction of Milltown Dam in 1907. Milltown Dam was breached on March 28, 2008, as part of Superfund remedial activities to remove the dam and contaminated sediment that had accumulated in Milltown Reservoir. The estimated loads transported through the project area during the periods before and after the breaching of Milltown Dam, and for the entire water year 2008, were used to quantify the net gain or loss (mass balance) of suspended sediment and trace elements within the project area during the transition from a reservoir environment to a free-flowing river. This study was done in cooperation with the U.S. Environmental Protection Agency. Streamflow during water year 2008 compared to long-term streamflow, as represented by the record for Clark Fork above Missoula (water years 1930-2008), generally was below normal (long-term median) from about October 2007 through April 2008. Sustained runoff started in mid-April, which increased flows to near normal by mid-May. After mid-May, flows sharply increased to above normal, reaching a maximum daily mean streamflow of 16,800 cubic feet per second (ft3/s) on May 21, which essentially equaled the long-term 10th-exceedance percentile for that date. Flows substantially above normal were sustained through June, then decreased through the summer and reached near-normal by August. Annual mean streamflow during water year 2008 (3,040 ft3/s) was 105 percent of the long-term mean annual streamflow (2,900 ft3/s). The annual peak flow (17,500 ft3/s) occurred on May 21 and was 112

  7. Dam health diagnosis and evaluation

    Science.gov (United States)

    Wu, Zhongru; Su, Huaizhi

    2005-06-01

    Based on the bionics principle in the life sciences field, we regard a dam as a vital and intelligent system. A bionics model is constructed to observe, diagnose and evaluate dam health. The model is composed of a sensing system (nerve), central processing unit (cerebrum) and decision-making implement (organism). In addition, the model, index system and engineering method on dam health assessment are presented. The proposed theories and methods are applied to evaluate dynamically the health of one concrete dam.

  8. Libby Mitigation Program, 2007 Annual Progress Report: Mitigation for the Construction and Operation of Libby Dam.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James; DeShazer, J.; Garrow, L.

    2009-05-26

    Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possible conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to 'protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to restore the fisheries

  9. Rehabilitation of the John Hart dam

    International Nuclear Information System (INIS)

    Cathcart, D.S.

    1989-01-01

    The largest and most recent rehabilitation project undertaken by British Columbia Hydro involves the John Hart Dam on the Campbell River on Vancouver Island. This area has the potential for large earthquake events, with an earthquake with a 7.3 rating on the Richter scale occurring as construction was underway in 1946. Investigation showed that the dam and foundations were liable to liquify under low seismic loading, and the area downstream is now well developed and inhabited. Taking the 120 MW power plant out of operation would jeopardize the power supply to northern Vancouver Island, so it was decided to take immediate steps to stabilize the most sensitive areas and then to rehabilitate the dam to an acceptable level of earthquake resistance while maintaining the reservoir at normal level with the power plant in operation. Using innovative engineering techniques and careful monitoring, the project, which included foundation improvement under existing structures and virtual rebuilding of the earthdam, was completed without lowering the reservoir. In spite of the very restrictive environmental constraints, the work was done without unacceptable environmental impact or adverse public reaction. Costs were $24 million, slightly under budget. All instrumentation has been monitored on a regular basis and the performance of the dam is satisfactory. 7 figs

  10. White River Falls Fish Passage Project, Tygh Valley, Oregon : Final Technical Report, Volume III, Appendix B, Fisheries Report; Appendix C, Engineering Alternative Evaluation; Appendix D, Benefit/Cost Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    Oregon. Dept. of Fish and Wildlife; Mount Hood National Forest (Or.)

    1985-06-01

    Studies were conducted to describe current habitat conditions in the White River basin above White River Falls and to evaluate the potential to produce anadromous fish. An inventory of spawning and rearing habitats, irrigation diversions, and enhancement opportunities for anadromous fish in the White River drainage was conducted. Survival of juvenile fish at White River Falls was estimated by releasing juvenile chinook and steelhead above the falls during high and low flow periods and recapturing them below the falls in 1983 and 1984. Four alternatives to provide upstream passage for adult salmon and steelhead were developd to a predesign level. The cost of adult passage and the estimated run size of anadromous fish were used to determine the benefit/cost of the preferred alternative. Possible effects of the introduction of anadromous fish on resident fish and on nearby Oak Springs Hatchery were evaluated. This included an inventory of resident species, a genetic study of native rainbow, and the identification of fish diseases in the basin. This volume contains appendices of habitat survey data, potential production, resident fish population data, upstream passage designs, and benefit/cost calculations. (ACR)

  11. Proceedings of dam safety seminar

    International Nuclear Information System (INIS)

    1989-01-01

    A seminar was held to discuss issues of dam safety. Presentations concerned dam safety evaluation, dam monitoring, erosion protection, ice loads, spillway design, flood prediction, emergency preparedness, reservoir management, rehabilitation, and foundation design. Separate abstracts have been prepared for 16 papers from the seminar

  12. Thermal effects of dams in the Willamette River basin, Oregon

    Science.gov (United States)

    Rounds, Stewart A.

    2010-01-01

    Methods were developed to assess the effects of dams on streamflow and water temperature in the Willamette River and its major tributaries. These methods were used to estimate the flows and temperatures that would occur at 14 dam sites in the absence of upstream dams, and river models were applied to simulate downstream flows and temperatures under a no-dams scenario. The dams selected for this study include 13 dams built and operated by the U.S. Army Corps of Engineers (USACE) as part of the Willamette Project, and 1 dam on the Clackamas River owned and operated by Portland General Electric (PGE). Streamflows in the absence of upstream dams for 2001-02 were estimated for USACE sites on the basis of measured releases, changes in reservoir storage, a correction for evaporative losses, and an accounting of flow effects from upstream dams. For the PGE dam, no-project streamflows were derived from a previous modeling effort that was part of a dam-relicensing process. Without-dam streamflows were characterized by higher peak flows in winter and spring and much lower flows in late summer, as compared to with-dam measured flows. Without-dam water temperatures were estimated from measured temperatures upstream of the reservoirs (the USACE sites) or derived from no-project model results (the PGE site). When using upstream data to estimate without-dam temperatures at dam sites, a typical downstream warming rate based on historical data and downstream river models was applied over the distance from the measurement point to the dam site, but only for conditions when the temperature data indicated that warming might be expected. Regressions with measured temperatures from nearby or similar sites were used to extend the without-dam temperature estimates to the entire 2001-02 time period. Without-dam temperature estimates were characterized by a more natural seasonal pattern, with a maximum in July or August, in contrast to the measured patterns at many of the tall dam sites

  13. Influence of the Golfito earthquake of 30 July 2002 (Mw 6,2) over a pumping test in the confined aquifer in dam site of Pirris Hydroelectric Project

    International Nuclear Information System (INIS)

    Vargas, Asdrubal G.

    2016-01-01

    A pumping test was carry out during 2560 minutes with an average flow rate of 1,9 l/s, using a submersible pump of 5,6 kW, in order to determine the hydrogeological parameters of the fractured confined aquifer founded in the dam site of the Pirris Hydroelectric Power. A significant change in the drawdowns values was observed in four piezometers, approximately 420 minutes after the beginning of the pumping test. This was caused by an earthquake with a magnitude of 6.2 M w with an epicenter near the town of Golfito (133,7 km far away). After the event a recovery of the groundwater level in all piezometers were recorded, although the well continued with the extraction process. Five phases were identified using the recorded level and the time. Phase 1, a drawdown of groundwater level was caused by pumping with a 6-hour period; the second phase was shown a sharp recovery as a result of the earthquake. The third phase was related to stabilization levels after the earthquake, however then a new level recovery phase was occurred due to several aftershocks. Finally another period of small drawdown was presented. After the test the data were reviewed to determine the effect of various parameters. For example partial penetration of the well, and the dip of the aquifer. From this preliminary analysis it was concluded that these factors did not influence the traditional method for the estimation of hydrodynamic parameters, therefore it was decided to analyze the data by the method of Theis and Moench for confined and fractured aquifers respectively. (author) [es

  14. Aquatic organism passage at road-stream crossings—synthesis and guidelines for effectiveness monitoring

    Science.gov (United States)

    Robert L. Hoffman; Jason B. Dunham; Bruce P. Hansen

    2012-01-01

    Restoration and maintenance of passage for aquatic organisms at road-stream crossings represents a major management priority, involving an investment of hundreds of millions of dollars. This report has been written, in part, for field biologists who will be undertaking and evaluating the effectiveness of aquatic organism passage restoration projects at road-stream...

  15. Limnology of hartbeespoort dam

    CSIR Research Space (South Africa)

    Ashton, PJ

    1985-01-01

    Full Text Available Hartbeespoort Dam is a hypertrophic, warm, monomictic impoundment. With a mean depth of 9.6 m and a surface area of 20 km2, the system demonstrates that hypertrophy is not confined to small shallow lakes as concluded by Barica (1981...

  16. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    DeHart, Michele (Columbia Basin Fish and Wildlife Authority, Portland, OR)

    2005-07-01

    The runoff volume for 2004 was below average throughout the Columbia Basin. At The Dalles the January-July runoff volume was 77% of average or 83.0 MAF. Grand Coulee, Hungry Horse, and Libby were below their Biological Opinion reservoir target elevations on April 10 at the beginning of the spring salmon migration season. All major storage reservoirs except Libby, Grand Coulee, Hungry Horse, Dworshak, and Brownlee were within a few feet of full by the end of June and early July. Overall, NOAA Biological Opinion seasonal flow targets were not met at any project for either spring or summer migrations of salmon and steelhead. Overall, spill was reduced in 2004. Implementation of Biological Opinion spill for fish passage measures was wrought with contention in 2004, particularly for summer spill which was finally the subject of litigation. The spring migration spill season began with debate among the fishery mangers and tribes and action agencies regarding spill at Bonneville Dam for the Spring Creek Hatchery release. The USFWS agreed to a spill test versus a corner collector operation to determine the best route for survival for these fish. The USFWS agreement includes no spill for early Spring Creek Hatchery releases for the next two years. Spring spill at Snake River transportation sites was eliminated after April 23, and transportation was maximized. The federal operators and regulators proposed to reduce Biological Opinion summer spill measures, while testing the impact of those reductions. This proposal was eventually rejected in challenges in the Federal Ninth Circuit Court. The Corps of Engineers reported that spill at Bonneville Dam in the 2002 to 2004 period was actually lower than reported due to a spill calibration error at the project. Because flows were low and spill levels were easily controlled few fish were observed with any signs of Gas Bubble Trauma. The annual Smolt Monitoring Program was implemented and provided in-season timing and passage

  17. Pacific Lamprey Research and Restoration Project : Annual Report 2001.

    Energy Technology Data Exchange (ETDEWEB)

    Close, David A.

    2002-11-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993; Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers, thus effecting larval recruitment in the basin. Adult pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River. In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River. To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2001.

  18. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 1992 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Brimmer, Arnold F.

    1993-11-01

    This project monitored the daily passage of chinook salmon Oncorhynchus tshawytscha and steelhead trout 0. mykiss smolts during the 1992 spring outmigration at migrant traps on the Snake River and the Clearwater River. Annual chinook salmon catch at the Snake River trap was the second lowest since the beginning of this project. The low trap catch wall due to extremely poor trap efficiency associated with severe low flows. Hatchery steelhead trout catch was similar to 1988 through 1991. Wild steelhead trout catch was 35% less than in 1991. Operations at the Snake River trap and a new screw trap were extended through the end of July to collect summer-migrating age-0 chinook. The differentiation of age-0 chinook from spring and Bummer chinook (age-1) using physical characteristics was again employed in 1992. The Snake River trap and the screw trap collected 20 and 18 age-0 chinook salmon, respectively, due to extremely low discharge. Chinook salmon catch at the Clearwater River trap was the highest since trap operation began in 1984. Hatchery steelhead trout trap catch was 23% lower than in 1991. Wild steelhead trout trap catch wall the highest since trap operation began. Fish tagged with Passive Integrated Transponder (PIT) tags at the Snake River trap were interrogated at three dams with PIT-tag detection systems (Lower Granite, Little Goose, and McNary dams). Cumulative interrogation, for fish marked at the Snake River trap, was not calculated for chinook salmon due to a lack of data over the entire migration season. The rates for hatchery steelhead trout and wild steelhead trout were 44.9% and 72.9% respectively. Cumulative interrogation at the three dams for fish PIT-tagged at the Clearwater River trap was 55.1% for chinook salmon, 60.4% for hatchery steelhead trout, and 73.1% for wild steelhead trout. Cumulative interrogations for hatchery steelhead tagged at the Snake River trap and recovered at the downstream dams was about 50% less than in previous years.

  19. Application of SWAT Model to Estimate the Runoff and Sediment Load from the Right Bank Valleys of Mosul Dam Reservoir

    OpenAIRE

    Ezz-Aldeen, Mohammad; Al-Ansari, Nadhir; Knutsson, Sven

    2012-01-01

    Mosul Dam is the biggest hydraulic structure on the River Tigris in Iraq with 11.11 billion m3 storage capacity. The dam is a multipurpose project. It is used to store the water for irrigation, hydropower generation, and flood control. As in other dams in the world, this dam also have sedimentation problem. Sediment accumulation in its reservoir can effect the dam operation (pumping station, hydropower plants, and bottom outlets) and it will definitely shorten the life span of the dam. In thi...

  20. Fish ladders: safe fish passage or hotspot for predation?

    Directory of Open Access Journals (Sweden)

    Angelo Antonio Agostinho

    Full Text Available Fish ladders are a strategy for conserving biodiversity, as they can provide connectivity between fragmented habitats and reduce predation on shoals that accumulate immediately below dams. Although the impact of predation downstream of reservoirs has been investigated, especially in juvenile salmonids during their downstream movements, nothing is known about predation on Neotropical fish in the attraction and containment areas commonly found in translocation facilities. This study analysed predation in a fish passage system at the Lajeado Dam on the Tocantins River in Brazil. The abundance, distribution, and the permanence (time spent of large predatory fish along the ladder, the injuries imposed by piranhas during passage and the presence of other vertebrate predators were investigated. From December 2002 to October 2003, sampling was conducted in four regions (downstream, along the ladder, in the forebay, and upstream of the reservoir using gillnets, cast nets and counts or visual observations. The captured fish were tagged with thread and beads, and any mutilations were registered. Fish, birds and dolphins were the main predator groups observed, with a predominance of the first two groups. The entrance to the ladder, in the downstream region, was the area with the highest number of large predators and was the only region with relevant non-fish vertebrates. The main predatory fish species were Rhaphiodon vulpinus, Hydrolycus armatus, and Serrasalmus rhombeus. Tagged individuals were detected predating along the ladder for up to 90 days. Mutilations caused by Serrasalmus attacks were noted in 36% of species and 4% of individuals at the top of the ladder. Our results suggested that the high density of fish in the restricted ladder environment, which is associated with injuries suffered along the ladder course and the presence of multiple predator groups with different predation strategies, transformed the fish corridor into a hotspot for

  1. Investigation of seepage under the Wenxiakou dam using radiotracer

    International Nuclear Information System (INIS)

    Li Zhangsu

    1988-01-01

    This paper describes the result of seepage observation on the dam foundation of Wenxiakou Reservoir using radioactive NaI (I-131) as a tracer. The main feature of the observing technique is to ascertain the seepages between the dam foundation and the clay core wall and around the abutment by measuring vertical flow. The results obtained from the observation have provided some important information for planning the engineering project of anti-seepage and reinforcement of the dam foundation and its right abutment. (author). 2 refs, 4 figs, 1 tab

  2. Seismic rehabilitation and analysis of Chaohe earth dam

    Science.gov (United States)

    Fu, Lei; Zeng, Xiangwu

    2005-12-01

    Stability of earth dams during earthquakes has been a major concern for geotechnical engineers in seismic active regions. Liquefaction induced slope failure occurred at the upstream slope of a major earth dam in the suburb of Beijing, China, during the 1976 Tangshan Earthquake. The gravelly soil with loose initial condition liquefied under relatively small ground vibration. In recent years, a major seismic rehabilitation project was carried out on a similar earth dam nearby using dumped quarry stone. Seismic stability analysis was carried out using model test, finite element simulation, and pseudo-static slope stability program after taking into account the influence of excess pore pressure.

  3. Report on Auscultation of the Arenal's Dam P. H. Arenal

    International Nuclear Information System (INIS)

    1994-09-01

    The Costa Rican Electricity Institute (Instituto Costarricense de Electricidad), always has been worried to verify the good state of the works and thus to guarantee its operation. For that reason, it has established different sorts of auscultation to the Arenal's Dam. This report analyzes the geo-hydraulic, structural and topographic auscultation. It also includes information about the new techniques used by the ARCAL XVIII RLA/8/018; application of Tracer Techniques for the study of water leakage in dams and damming projects. (author). 18 charts, 2 maps, 4 tabs

  4. Experimental Study on Cracking, Reinforcement, and Overall Stability of the Xiaowan Super-High Arch Dam

    Science.gov (United States)

    Lin, Peng; Zhou, Weiyuan; Liu, Hongyuan

    2015-03-01

    The Xiaowan super-high arch dam has faced challenging construction problems. Here, we provide a scientifically-based reference for applying geomechanical model testing to support the nonlinear design of super-high arch dams. We applied experimental similarity theory and techniques. Based on four 3D geomechanical model tests, the dam stress characteristics, deformation distribution, and the safety factors of the dam foundation were identified and compared. We also analyzed cracking characteristics of the up- and downstream dam surfaces and induced joints in the dam heel, the rock mass failure process of the dam-foundation interface, and the abutments. We propose foundation reinforcement measures for weak rock masses, alteration zones, and other faults in the abutments based on the 3D and plane tests each at a different elevation. The results show that all dam deformations remained normal with no yielding or tensile cracking under a normal water load. The reinforced rock mass increased the crack initial safety in the dam heel and toe by ~20 %. The minimum crack initial safety factor ( K 1) of the dam heel was 1.4. The induced joint in the dam heel contributed to a reduction in tensile stress at the upstream dam heel, improving K 1. Compared with similar projects following reinforcement measures, the abutment stiffness and overall stability of the Xiaowan arch dam satisfy operational requirements. Four years of monitoring operations show that key areas near the dam remained normal and the dam foundation is functioning well. Our results may also be applicable to the design and construction of similar projects worldwide.

  5. Combating Poverty by Irrigation from Large Dams in Arid Countries: A Case Study of Minab Dam, Iran

    Directory of Open Access Journals (Sweden)

    ALI ASGHAR IRAJ POOR

    2010-10-01

    Full Text Available A set of indicators for sustainable development were identified to be employed in developing countries. The selected indicators provided a good understanding of social and engineering outputs of a water resources project. Results of the study revealed that there are significant positive impacts of dam construction but they were not same as the targeted objectives envisaged in the feasibility report of the project. It means that after construction of the dam and irrigation system, development didn?t match with the targeted goals of the project. This study argues the world-wide controversy against construction of dam in arid zone which is ill-founded and based on a few short term, mitigable negative impacts, ignoring many positive long term inputs alleviating chronic poverty in arid regions. The study meticulously looks into the pre dam bio-physical and socio-economic conditions in one of the arid region of Iran under the area commanded by Minab dam. This dam was constructed in Hormozgan province of Iran in 1983 and its irrigation system was completed in 1986 which was followed by progressive expansion of irrigated agriculture which almost doubled in year 2006. Literacy rate has increased from 41% (pre-project to 74% in 2006. Similarly, significant improvements were observed in health care, sanitation, education, and other disciplines.

  6. Hydroacoustic Monitoring of Downstream Migrant Salmon and Steelhead at Wells Dam in Spring 1984.

    Energy Technology Data Exchange (ETDEWEB)

    Raemhild, Gary A.

    1984-10-31

    The downstream migration of salmon and steelhead in spring 1984 at Wells Dam on the mid-Columbia River was monitored using hydroacoustics. The primary objective of this research was to document run timing and describe the distribution of smolts at the dam. The study occurred from April 2 to June 15, 1984. Four transducers were deployed at the bases of pier noses at Turbines 3, 5, 7, and 9 and aimed up 24/sup 0/ into the forebay. They were sampled once every hour, 24 hours per day, for 75 days. An index of fish passage was reported daily to the Water Budget Center in Portland, Oregon. This index was computed as follows. For each 24-h period, separate fish passage rates (number/time) at each of the four sampling locations were estimated by dividing the sum of the ''weighted'' fish detections by total sample time. These four values then were averaged to produced the daily index (number/day/location). The first substantial increase in fish passage occurred on April 25, 1984 due to the chinook released from the Winthrop hatchery on April 23. During May, run timing was fairly uniform except for peaks on May 2, 14, 18, and 22. The unexpected peak in run size that occurred from May 29 to June 2 could have been caused by juvenile mountain whitefish. Although the proportion of each species varied, chinook passage probably peaked in late April, and steelhead in the first two weeks of May; sockeye passage was variable throughout the study. The data indicated that most downstream migrants were distributed high in the water column and toward the western end of the dam. Average hourly passage rates for day and night were similar, but more fish passed the dam during the longer period of daylight than the shorter period of darkness. 7 refs., 13 figs.

  7. National Dam Safety Program. Roxbury Dam (Inventory Number 788) Delaware River Basin, Delaware County, New York. Phase I Inspection Report,

    Science.gov (United States)

    1980-05-21

    num~ber) This report provides information and analys’s on the physical condition o0 4 Sthe dam as of the report date. Information and anaLysis nre...based on visuL ’ inspection of the dam by the performing organization. W Examination of available documents’ and a visual inspection of the C- C.2 dam...c ’U . ELA AR-E iV pf@8% L / ........ DELWARE COUNTY,-NEW YORK, TABLE OFCNTI’ r ".. PAGE NO. ASSESSMENT OVERVIEW PHOTOGRAPH 1 PROJECT INFORMATION 1

  8. 75 FR 22758 - Notice of Intent To Prepare a Draft Environmental Impact Statement and Dam Safety Assurance...

    Science.gov (United States)

    2010-04-30

    ... Prepare a Draft Environmental Impact Statement and Dam Safety Assurance Program Modification Report for the Martis Creek Dam Project, Nevada County, CA AGENCY: Department of the Army, U.S. Army Corps of... Environmental Impact Statement (EIS) for the Federal action to remediate seismic, seepage, and hydrologic dam...

  9. 75 FR 4363 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2010-01-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2183-072] Grand River Dam... No.: 2183-072. c. Date Filed: August 4, 2009. d. Applicant: Grand River Dam Authority. e. Name of... 16 U.S.C. 791(a)-825(r). h. Applicant Contact: D. Casey Davis, Grand River Dam Authority, P.O. Box...

  10. 78 FR 1210 - Grand River Dam Authority; Notice of Telephone Meeting To Discuss the Salina Pumped Storage...

    Science.gov (United States)

    2013-01-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2524-018] Grand River Dam.... Eastern Standard Time). b. Place: Teleconference hosted by Grand River Dam Authority. (An RSVP is required...-up to its study report meeting of October 11, 2012, the Grand River Dam Authority (GRDA) is holding a...

  11. 75 FR 6004 - Notice of Intent To Prepare a Draft Environmental Impact Statement and Dam Safety Assurance...

    Science.gov (United States)

    2010-02-05

    ... Prepare a Draft Environmental Impact Statement and Dam Safety Assurance Program Modification Report for the Isabella Dam Project, Kern County, CA AGENCY: Department of the Army, U.S. Army Corps of Engineers...) for the Federal action to remediate seismic, seepage, and hydrologic dam safety concerns at the...

  12. Resilience scales of a dammed tropical river

    Science.gov (United States)

    Calamita, Elisa; Schmid, Martin; Wehrli, Bernhard

    2017-04-01

    Artificial river impoundments disrupt the seasonality and dynamics of thermal, chemical, morphological and ecological regimes in river systems. These alterations affect the aquatic ecosystems in space and time and specifically modify the seasonality and the longitudinal gradients of important biogeochemical processes. Resilience of river systems to anthropogenic stressors enables their recovery along the flow path; however little is known about the longitudinal distance that rivers need to partially restore their physical, chemical and biological integrity. In this study, the concept of a "resilience scale" will be explored for different water quality parameters downstream of Kariba dam, the largest artificial lake in the Zambezi basin (South-East Africa). The goal of this project is to develop a modelling framework to investigate and quantify the impact of large dams on downstream water quality in tropical context. In particular, we aim to assess the degree of reversibility of the main downstream alterations (temperature, oxygen, nutrients) and consequently the quantification of their longitudinal extent. Coupling in-situ measurements with hydraulic and hydrological parameters such as travel times, will allow us to define a physically-based parametrization of the different resilience scales for tropical rivers. The results will be used for improving future dam management at the local scale and assessing the ecological impact of planned dams at the catchment scale.

  13. The importance of cultural aspects in impact assessment and project: developmentreflections from a case study of a hydroelectric dam in Brazil

    NARCIS (Netherlands)

    Hanna de Almeida Oliveira, Philippe; Vanclay, Frank; Langdon, Esther Jean; Arts, Jos

    2016-01-01

    Failure to consider the cultural and social factors of projects can lead to situations where mitigation does not effectively address the impacts they were intended to alleviate, and can even create other impacts. We critically analyse the processes of designing and implementing a social and

  14. 76 FR 26718 - Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment

    Science.gov (United States)

    2011-05-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003 Montana] Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment In accordance... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S...

  15. 77 FR 2970 - Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental...

    Science.gov (United States)

    2012-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003] Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental Assessment In accordance with... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S...

  16. Expansion at Olympic Dam

    International Nuclear Information System (INIS)

    Lewis, C.

    1997-01-01

    The Olympic Dam orebody is the 6th largest copper and the single largest uranium orebody in the world. Mine production commenced in June 1988, at an annual production rate of around 45,000 tonnes of copper and 1,000 tonnes of uranium. Western Mining Corporation announced in 1996 a proposed $1.25 billion expansion of the Olympic Dam operation to raise the annual production capacity of the mine to 200,000 tonnes of copper, approximately 3,700 tonnes of uranium, 75,000 ounces of gold and 950,000 ounces of silver by 2001. Further optimisation work has identified a faster track expansion route, with an increase in the capital cost to $1.487 billion but improved investment outcome, a new target completion date of end 1999, and a new uranium output of 4,600 tonnes per annum from that date

  17. A multi-scale GIS and hydrodynamic modelling approach to fish passage assessment: Clarence and Shoalhaven Rivers, NSW Australia

    Science.gov (United States)

    Bonetti, Rita M.; Reinfelds, Ivars V.; Butler, Gavin L.; Walsh, Chris T.; Broderick, Tony J.; Chisholm, Laurie A.

    2016-05-01

    Natural barriers such as waterfalls, cascades, rapids and riffles limit the dispersal and in-stream range of migratory fish, yet little is known of the interplay between these gradient dependent landforms, their hydraulic characteristics and flow rates that facilitate fish passage. The resurgence of dam construction in numerous river basins world-wide provides impetus to the development of robust techniques for assessment of the effects of downstream flow regime changes on natural fish passage barriers and associated consequences as to the length of rivers available to migratory species. This paper outlines a multi-scale technique for quantifying the relative magnitude of natural fish passage barriers in river systems and flow rates that facilitate passage by fish. First, a GIS-based approach is used to quantify channel gradients for the length of river or reach under investigation from a high resolution DEM, setting the magnitude of identified passage barriers in a longer context (tens to hundreds of km). Second, LiDAR, topographic and bathymetric survey-based hydrodynamic modelling is used to assess flow rates that can be regarded as facilitating passage across specific barriers identified by the river to reach scale gradient analysis. Examples of multi-scale approaches to fish passage assessment for flood-flow and low-flow passage issues are provided from the Clarence and Shoalhaven Rivers, NSW, Australia. In these river systems, passive acoustic telemetry data on actual movements and migrations by Australian bass (Macquaria novemaculeata) provide a means of validating modelled assessments of flow rates associated with successful fish passage across natural barriers. Analysis of actual fish movements across passage barriers in these river systems indicates that two dimensional hydraulic modelling can usefully quantify flow rates associated with the facilitation of fish passage across natural barriers by a majority of individual fishes for use in management

  18. Regional Assessment of Supplementation Project

    International Nuclear Information System (INIS)

    1991-10-01

    The Fish and Wildlife Program of the Northwest Power Planning Council (NPPC) prescribes several approaches to achieve its goal of doubling the salmon and steelhead runs of the Columbia River. Among those approaches are habitat restoration, improvements in adult and juvenile passage at dams and artificial propagation. Supplementation will be a major part of the new hatchery programs. The purpose of the Regional Assessment of Supplementation Project (RASP) is to provide an overview of ongoing and planned supplementation activities, to construct a conceptual framework and model for evaluating the potential benefits and risks of supplementation and to develop a plan for better regional coordination of research and monitoring and evaluation of supplementation. RASP has completed its first year of work. Progress toward meeting the first year's objectives and recommendations for future tasks are contained in this report

  19. Dam spills and fishes

    International Nuclear Information System (INIS)

    1996-01-01

    This short paper reports the main topics discussed during the two days of the annual colloquium of the Hydro-ecology Committee of EdF. The first day was devoted to the presentation of the joint works carried out by EdF, the Paul-Sabatier University (Toulouse), the Provence St-Charles University (Marseille), the ENSAT (Toulouse) and the CEMAGREF (Lyon and Aix-en-Provence) about the environmental impact of dam spills on the aquatic flora and fauna downstream. A synthesis and recommendations were presented for the selection and characterization of future sites. The second day was devoted to the hydro-ecology study of the dam reservoir of Petit-Saut (French Guyana): water reoxygenation, quality evolution, organic matter, plankton, invertebrates and fishes. The 134 French dams concerned by water spills have been classified according to the frequency of spills, the variations of flow rates created, and their impacts on fishing, walking, irrigation, industry, drinking water, navigation, bathing. Particular studies on different sites have demonstrated the complexity of the phenomena involved concerning the impact on the ecosystems and the water quality. (J.S.)

  20. Trading river services: optimizing dam decisions at the basin scale to improve socio-ecological resilience

    Science.gov (United States)

    Roy, S. G.; Gold, A.; Uchida, E.; McGreavy, B.; Smith, S. M.; Wilson, K.; Blachly, B.; Newcomb, A.; Hart, D.; Gardner, K.

    2017-12-01

    Dam removal has become a cornerstone of environmental restoration practice in the United States. One outcome of dam removal that has received positive attention is restored access to historic habitat for sea-run fisheries, providing a crucial gain in ecosystem resilience. But dams also provide stakeholders with valuable services, and uncertain socio-ecological outcomes can arise if there is not careful consideration of the basin scale trade offs caused by dam removal. In addition to fisheries, dam removals can significantly affect landscape nutrient flux, municipal water storage, recreational use of lakes and rivers, property values, hydroelectricity generation, the cultural meaning of dams, and many other river-based ecosystem services. We use a production possibility frontiers approach to explore dam decision scenarios and opportunities for trading between ecosystem services that are positively or negatively affected by dam removal in New England. Scenarios that provide efficient trade off potentials are identified using a multiobjective genetic algorithm. Our results suggest that for many river systems, there is a significant potential to increase the value of fisheries and other ecosystem services with minimal dam removals, and further increases are possible by including decisions related to dam operations and physical modifications. Run-of-river dams located near the head of tide are often found to be optimal for removal due to low hydroelectric capacity and high impact on fisheries. Conversely, dams with large impoundments near a river's headwaters can be less optimal for dam removal because their value as nitrogen sinks often outweighs the potential value for fisheries. Hydropower capacity is negatively impacted by dam removal but there are opportunities to meet or exceed lost capacity by upgrading preserved hydropower dams. Improving fish passage facilities for dams that are critical for safety or water storage can also reduce impacts on fisheries. Our

  1. Fish Passage Center 2000 annual report.; ANNUAL

    International Nuclear Information System (INIS)

    Fish Passage Center

    2001-01-01

    plan, spill hours were increased at Lower Monumental Dam. Spill volume at The Dalles was reduced and daytime spill tests were conducted at John Day and Bonneville Dams. Although provided for fish, most spill that occurred in 2000 was either in excess of project hydraulic capacity or excess generation. This effectively reduced the actual cost of the spill program. For the most part, spill in 2000 was managed to the waiver limits for total dissolved gas levels and the NMFS action criteria for dissolved gas signs were not exceeded. Hatchery spring chinook returns comprised an estimated 81.4% of the total spring chinook adult return to Lower Granite Dam. Smolt travel time and survival were similar to past years for most Smolt Monitoring Program groups. The notable exceptions were Snake River hatchery steelhead groups and mid-Columbia hatchery sub-yearling groups from Wells and Ringold hatcheries, which had significantly lower survival than previous years. Yearling chinook travel time showed variation from past years, reflecting the atypical flow shape in 2000 which had high flows in April, declining through May

  2. Ecohydrology of a Dammed Amazon

    Science.gov (United States)

    Timpe, K. A.; Kaplan, D. A.

    2016-12-01

    The Amazon River watershed is the world's largest river basin and provides >US$30 billion/yr in ecosystem services to local populations, national societies and humanity at large. Construction of >30 large hydroelectric dams and >170 small dams in the Brazilian Amazon is currently underway as a result of governmental plans geared toward increased energy security, economic growth, improved living standards and industrialization. Changes in the Amazon's freshwater ecosystems from the development of hydropower will have a cascade of physical, ecological, and social effects at local to global scales. Here we demonstrate the extensive and large-scale effects of hydroelectric dams in the Amazon region on hydrologic parameters calculated using the Indicators of Hydrologic Alteration (IHA) method applied to 33 small and large dams in the Brazilian Amazon. Our analysis provides the first holistic assessment of hydrological alterations (HA) caused by Amazonian dams and offers insight on the primary physical and management drivers of dam impacts. Across sites, results show that dams have affected all ecologically important flow characteristics (i.e., magnitude, duration, timing, frequency and rate of change of pulse events). While each dam/river system are unique, some dams cause substantially greater HA. The "worst" dams were Balbina (HA=108%), Manso (HA=62%), and Serra da Mesa (HA=48%). All three are "large" dams with substantial reservoirs, however Serra da Mesa produces 6 times more electricity than either Balbina or Manso, with lower impact. The most dramatic dam-induced shifts in hydrologic regime were related to the frequency/duration and frequency/rate of change of pulse events. HA on rivers with multiple dams was only 8% higher than those with individual dams. Dam elevation and reservoir area were the best environmental predictors of HA. Results suggest that hydrological impacts from dams are similar among temperate and tropical climates (i.e., peak flows are often

  3. Rites of passage in Italy.

    Science.gov (United States)

    Field, Carol

    2010-01-01

    Unlike the vast number of public celebrations in Italy that are almost always associated with specific foods, rites of passage in that country are focused on pivotal private moments after the ceremonial crossing of a threshold; and food may or may not be a primary focus of the event. Recognition of birth, marriage, and death—the three major turning points in the intimate life of a family—may still be observed with dishes or ingredients traceable to the Renaissance, but many older traditions have been modified or forgotten entirely in the last thirty years. Financial constraints once preserved many customs, especially in the south, but regional borders have become porous, and new food trends may no longer reflect the authentic tradition. Can new movements, such as Slow Food, promote ancient values as the form and food of traditional events continue to change?

  4. "Pills" and the air passages.

    Science.gov (United States)

    Küpeli, Elif; Khemasuwan, Danai; Lee, Pyng; Mehta, Atul C

    2013-08-01

    Aspiration of a medication in the airways in any form produces a variety of adverse effects, both local and systemic. Furthermore, specific reaction of the airways to each type of pill strongly affects the outcome. It is crucial for pulmonologists and emergency medicine specialists to acknowledge this clinical entity. In addition, airways have been increasingly used to deliver medications such as insulin and prostacycline. These aerosolized medications can also cause local as well as systemic side effects. We review the local and systemic reactions of these "pills" accessing the airways either by incidental aspiration or iatrogenic administration. We address clinical presentation, mechanism of injury, diagnosis, and management of complications of these pills in the air passages.

  5. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 1990 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Nelson, V. Lance

    1991-05-01

    This project monitored the daily passage of chinook salmon Oncorhynchus tshawytscha and steelhead trout Oncorhynchus mvkiss smolts during the 1990 spring outmigration at migrant traps on the Snake River and the Clearwater River. Chinook salmon catch at the Snake River trap was similar to 1987 and 1988, drought years, but considerably less than 1989, a near normal flow year. Trapping effort was the same during the four years. Hatchery steelhead trout catch was similar to 1988 and 1989. Wild steelhead trout catch was greater than in any previous year. Chinook salmon catch at the Clearwater River trap was slightly less than in 1987 or 1988 and considerably higher than in 1989. Hatchery steelhead trout trap catch was 3 to 26 times greater than in previous years. Wild steelhead trout trap catch was 2 to 11 times greater than in previous years. Fish tagged with Passive Integrated Transponder (PIT) tags at the Snake River trap were recovered at the three dams with PIT tag detection systems (Lower Granite, Little Goose, and McNary dams). Cumulative recovery at the three dams for fish marked at the Snake River trap was 64.4% for chinook salmon, 83.1% for hatchery steelhead trout, and 79.0% for wild steelhead trout. Cumulative recovery at the three dams for fish PIT-tagged at the Clearwater River trap was 54.6% for chinook salmon, 77.6% for hatchery steelhead trout, and 70.4% for wild steelhead trout. Travel time (days) and migration rate (km/d) through Lower Granite Reservoir for PIT-tagged chinook salmon and steelhead trout, marked at the head of the reservoir, was affected by discharge. Statistical analysis showed that a two-fold increase in discharge increased migration rate by 2.2 times for PIT-tagged chinook salmon released from the Snake River trap and 1.8 times for chinook salmon released from the Clearwater River trap. A two-fold increase in discharge increased migration rate by 3.1 times for PIT-tagged hatchery steelhead trout released from the Snake River trap

  6. 1000 dams down and counting

    Science.gov (United States)

    O'Connor, James E.; Duda, Jeff J.; Grant, Gordon E.

    2015-01-01

    Forty years ago, the demolition of large dams was mostly fiction, notably plotted in Edward Abbey's novel The Monkey Wrench Gang. Its 1975 publication roughly coincided with the end of large-dam construction in the United States. Since then, dams have been taken down in increasing numbers as they have filled with sediment, become unsafe or inefficient, or otherwise outlived their usefulness (1) (see the figure, panel A). Last year's removals of the 64-m-high Glines Canyon Dam and the 32-m-high Elwha Dam in northwestern Washington State were among the largest yet, releasing over 10 million cubic meters of stored sediment. Published studies conducted in conjunction with about 100 U.S. dam removals and at least 26 removals outside the United States are now providing detailed insights into how rivers respond (2, 3).

  7. Types of integration and depressive symptoms: A latent class analysis on the resettled population for the Three Gorges dam project, China.

    Science.gov (United States)

    Xi, Juan

    2016-05-01

    Focusing on China's Three Gorges Project (TGP)-Induced Resettlement, the largest scale resettlement induced by a single development project, this study aims to investigate different types of integration patterns among the TGP re-settlers and how modes of integration associate with depressive symptoms. Using Latent Class Analysis, we analyzed survey data on 407 TGP re-settlers. We detected three integration patterns among these re-settlers: the fully integrated (68%), the culturally and economically integrated (21%) and the unintegrated (11%). We found that different integration types were linked to different levels of depressive symptoms. Unless fully integrated and experienced a warm feeling toward new community, re-settlers were vulnerable to elevated depressive symptoms. Our findings that culturally and economically integrated re-settlers had similar levels of depressive symptoms as the unintegrated re-settlers highlighted the importance of subjective dimension of integration and resettlement. We also found that rural re-settlers and those who move with the whole village were more likely to fall into the unintegrated category. Policy implications were discussed. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. National Dam Safety Program. Millbrook Watershed Project Site I (inventory Number NY 715) Susquehanna River Basin, Chenango County, New York. Phase 1 Inspection Report

    Science.gov (United States)

    1980-09-30

    Milibrook Watershed Project Site T fn~ %/ V National. Darm Safety Program Albny 1223 6. PJERMN ORG RAE04 NUBE Department of th Ar4 Neworek, No 128 9...4U CA > c~ 9%1 Ul NU.LUr -w Z CC 00 tn U.0D L ft SA. .4 ft 0WO ’ O ~02 cmi at 0 0 LA . 30S-U 30 0 ... J 00 z A ~0 3l zu 0 &u .ft~z ft 0 00 -. Q U. m...m m -4 4( -- jC 1- h .0 m -14 0. ~~Ia U% -4-4 tI L.4ET ID eu - - - - - N CU44-. -4..-4 - -L U SlU 20 uv0. 0. zcc f 0 LL U W LA N 0 - a U~ a. C.cr r L

  9. Factors affecting route selection and survival of steelhead kelts at Snake River dams in 2012 and 2013

    Energy Technology Data Exchange (ETDEWEB)

    Harnish, Ryan A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Colotelo, Alison H. A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Li, Xinya [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fu, Tao [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ham, Kenneth D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Deng, Zhiqun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Green, Ethan D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-03-31

    In 2012 and 2013, Pacific Northwest National Laboratory (PNNL) conducted a study that summarized the passage route proportions and route-specific survival rates of steelhead kelts that passed through Federal Columbia River Power System (FCRPS) dams. To accomplish this, a total of 811 steelhead kelts were tagged with Juvenile Salmon Acoustic Telemetry System (JSATS) transmitters. Acoustic receivers, both autonomous and cabled, were deployed throughout the FCRPS to monitor the downstream movements of tagged kelts. Kelts were also tagged with passive integrated transponder tags to monitor passage through juvenile bypass systems (JBS) and detect returning fish. The current study evaluated data collected in 2012 and 2013 to identify environmental, temporal, operational, individual, and behavioral variables that were related to forebay residence time, route of passage, and survival of steelhead kelts at FCRPS dams on the Snake River. Multiple approaches, including 3-D tracking, bivariate and multivariable regression modeling, and decision tree analyses were used to identify the environmental, temporal, operational, individual, and behavioral variables that had the greatest effect on forebay residence time, route of passage, and route-specific and overall dam passage survival probabilities for tagged kelts at Lower Granite (LGR), Little Goose (LGS), and Lower Monumental (LMN) dams. In general, kelt behavior and discharge appeared to work independently to affect forebay residence times. Kelt behavior, primarily approach location, migration depth, and “searching” activities in the forebay, was found to have the greatest influence on their route of passage. The condition of kelts was the single most important factor affecting their survival. The information gathered in this study may be used by dam operators and fisheries managers to identify potential management actions to improve in-river survival of kelts or collection methods for kelt reconditioning programs to aid

  10. Elwha River dam removal-Rebirth of a river

    Science.gov (United States)

    Duda, Jeffrey J.; Warrick, Jonathan A.; Magirl, Christopher S.

    2011-01-01

    After years of planning for the largest project of its kind, the Department of the Interior will begin removal of two dams on the Elwha River, Washington, in September 2011. For nearly 100 years, the Elwha and Glines Canyon Dams have disrupted natural processes, trapping sediment in the reservoirs and blocking fish migrations, which changed the ecology of the river downstream of the dams. All five Pacific salmon species and steelhead-historically present in large numbers-are locally extirpated or persist in critically low numbers. Upstream of the dams, more than 145 kilometers of pristine habitat, protected inside Olympic National Park, awaits the return of salmon populations. As the dams are removed during a 2-3 year project, some of the 19 million cubic meters of entrapped sediment will be carried downstream by the river in the largest controlled release of sediment into a river and marine waters in history. Understanding the changes to the river and coastal habitats, the fate of sediments, and the salmon recolonization of the Elwha River wilderness will provide useful information for society as future dam removals are considered.

  11. Study on Rock Bolt Reinforcement for a Gravity Dam Foundation

    Science.gov (United States)

    Chen, S. H.; Yang, Z. M.; Wang, W. M.; Shahrour, I.

    2012-01-01

    In this article, the rock bolt reinforcement mechanism is discussed, and the gravity method as well as the finite element method for the bolted rock is presented. These methods are applied to study the gravity dam foundation of the Xiaoxi Hydropower Project, which is influenced by the presence of a large fault with a cracked zone over 180 m wide. Rock bolt reinforcement was used to improve the stability of the dam foundation, and the reinforcement parameters were determined from a semi-empirical equation controlled by in situ test. The stability analysis was conducted using the above methods, and the improvement in terms of deformation and stress as well as stability of the dam foundation due to the reinforcement is assessed. Rock bolt reinforcement was completed successfully, and the dam started normal operations in January 2008.

  12. Dam Break Analysis of Embankment Dams Considering Breach Characteristics

    Directory of Open Access Journals (Sweden)

    Abolfazl Shamsaei

    2004-05-01

    Full Text Available The study of dam's break, needs the definition of various parameters such as the break cause, its type, its dimension and the duration of breach development. The precise forecast for different aspects of the breach is one of the most important factors for analyzing it in embankment dam. The characteristics of the breach and determination of their vulnerability has the most effect on the waves resulting from dam break. Investigating, about the parameters of the breach in "Silveh" earth dam have been determined using the suitable model. In Silve dam a trapezoid breach with side slope z=0.01m and the average base line b=80m was computed. The duration of the breaches development is 1.9 hour. Regarding the above results and the application of DAM Break software the consequences of the probable break of the dam was determined. The analysis of the results of water covering of the city of Piranshahr located 12km from silve dam confirms that in 3 hours the water will reach the height (level of 1425 meters.

  13. Providing Aquatic Organism Passage in Vertically Unstable Streams

    Directory of Open Access Journals (Sweden)

    JanineM Castro

    2016-04-01

    Full Text Available Aquatic organism passage barriers have been identified as one of the key impediments to recovery of salmonids and other migratory aquatic organisms in the Pacific Northwest of the United States. As such, state and federal agencies invest millions of dollars annually to address passage barriers. Because many barriers function as ad hoc grade control structures, their removal and/or replacement can unwittingly set off a cascade of effects that can negatively impact the very habitat and passage that project proponents seek to improve. The resultant vertical instability can result in a suite of effects that range from floodplain disconnection and loss of backwater and side channel habitat, to increased levels of turbidity. Risk assessment, including an evaluation of both the stage of stream evolution and a longitudinal profile analysis, provides a framework for determining if grade control is warranted, and if so, what type of structure is most geomorphically appropriate. Potential structures include placement of large wood and roughness elements, and constructed riffles, step-pools, and cascades. The use of structure types that mimic natural reach scale geomorphic analogues should result in improved aquatic organism passage, increased structural resilience, and reduced maintenance.

  14. The Changing Political Dynamics of Dam Building on the Mekong

    Directory of Open Access Journals (Sweden)

    Philip Hirsch

    2010-06-01

    Full Text Available This paper explores political dynamics surrounding dam building in the Mekong river basin, prior to, and following, the World Commission on Dams (WCD. Since the 1950s, dam building in the Mekong river basin has been enmeshed in a complex and shifting geopolitical and eco-political landscape. The broad geopolitical sweep of US hegemony, Cold War, regional rapprochement and the rise of China has been superimposed on eco-political shifts between modernist belief in progress as mastery over nature, concerns of global and national environmental movements over dams and their impacts, and a galvanised Mekong environmentalism. During the first decade of the 21st century, mainstream dams on the Lower Mekong have returned to the agenda after having almost disappeared in favour of tributary projects. The growing strength and assertiveness of regional economic players has fundamentally altered the context of energy demand, planning and investment. New sources of finance have relocated the points of political leverage. Environment has been mustered in favour of, as well as in opposition to, dam construction in the contexts of climate-change discourses, protected-area linkage with dam projects, and an industry push for sustainability protocols and certification. Despite the Mekong being one of its focal basins, WCD has not played a prominent role in this transformed arena, yet many of the social and environmental concerns, stakeholder-based processes and safeguard-oriented approaches to hydropower planning that WCD brought to the fore have persisted in the wider ethos of politics around dams in the region.

  15. Factors Affecting Route Selection and Survival of Steelhead Kelts at Snake River Dams in 2012 and 2013

    Energy Technology Data Exchange (ETDEWEB)

    Harnish, Ryan A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Colotelo, Alison HA [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Li, Xinya [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Ham, Kenneth D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Deng, Zhiqun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-12-01

    In 2012 and 2013, Pacific Northwest National Laboratory conducted a study that summarized the passage proportions and route-specific survival rates of steelhead kelts that passed through Federal Columbia River Power System (FCRPS) dams. To accomplish this, a total of 811 steelhead kelts were tagged with Juvenile Salmon Acoustic Telemetry System (JSATS) transmitters. Acoustic receivers, both autonomous and cabled, were deployed throughout the FCRPS to monitor the downstream movements of tagged-kelts. Kelts were also tagged with Passive Integrated Transponder tags to monitor passage through juvenile bypass systems and detect returning fish. The current study evaluated data collected in 2012 and 2013 to identify individual, behavioral, environmental and dam operation variables that were related to passage and survival of steelhead kelts that passed through FCRPS dams. Bayesian model averaging of multivariable logistic regression models was used to identify the environmental, temporal, operational, individual, and behavioral variables that had the highest probability of influencing the route of passage and the route-specific survival probabilities for kelts that passed Lower Granite (LGR), Little Goose (LGS), and Lower Monumental (LMN) dams in 2012 and 2013. The posterior probabilities of the best models for predicting route of passage ranged from 0.106 for traditional spill at LMN to 0.720 for turbine passage at LGS. Generally, the behavior (depth and near-dam searching activity) of kelts in the forebay appeared to have the greatest influence on their route of passage. Shallower-migrating kelts had a higher probability of passing via the weir and deeper-migrating kelts had a higher probability of passing via the JBS and turbines than other routes. Kelts that displayed a higher level of near-dam searching activity had a higher probability of passing via the spillway weir and those that did less near-dam searching had a higher probability of passing via the JBS and

  16. 76 FR 34692 - Inside Passage Electric Cooperative

    Science.gov (United States)

    2011-06-14

    ... containing a single 600-kilowatt turbine/generator unit; (7) a small switchyard located adjacent to the... Energy Regulatory Commission Inside Passage Electric Cooperative Notice of Preliminary Permit Application..., 2011, and supplemented on May 18, 2011, the Inside Passage Electric Cooperative filed an application...

  17. Adolescent Rites of Passage: An Experiential Model.

    Science.gov (United States)

    Venable, Stephen F.

    1997-01-01

    Discusses the origins and context of adolescence as a cultural phenomenon and illustrates how rites of passage can nurture healthy developmental changes in adolescents. Describes and evaluates the application of a rite of passage during a backpacking experience that was designed to usher teens from adolescence to adulthood in a Christian context.…

  18. Review of mitigation methods for fish passage, instream flows, and water quality

    International Nuclear Information System (INIS)

    Railsback, S.F.

    1991-01-01

    This paper reports on current environmental mitigation practices at nonfederal hydropower projects. Information was obtained from project operators on dissolved oxygen (DO) mitigation, instream flows, upstream fish passage facilities, and downstream fish passage facilities. The most common method for DO mitigation is the use of spill flows, which are costly because of lost power generation. DO concentrations are commonly monitored, but biological effects of DO mitigation are not. At many projects, instream flow requirements have been set without reference to formalized methods. About half of the projects with instream flow requirements monitor flow rates, but few monitor fish populations to verify that instream flows are effective. Angled bar racks are the most commonly used downstream fish passage devices and fish ladders are the most commonly used upstream fish passage devices. Fish passage rates or populations have been monitored to verify the effectiveness of passage mitigation at few projects. This analysis is the first phase of an evaluation of the costs, benefits, and effectiveness of mitigation measures

  19. War damages and reconstruction of Peruca dam

    International Nuclear Information System (INIS)

    Nonveiller, E.; Sever, Z.

    1999-01-01

    The paper describes the heavy damages caused by blasting in the Peruca rockfill dam in Croatia in January 1993. Complete collapse of the dam by overtopping was prevented through quick action of the dam owner by dumping clayey gravel on the lowest sections of the dam crest and opening the bottom outlet of the reservoir, thus efficiently lowering the water level. After the damages were sufficiently established and alternatives for restoration of the dam were evaluated, it was decided to construct a diaphragm wall through the damaged core in the central dam part as the impermeable dam element and to rebuild the central clay core at the dam abutments. Reconstruction works are described

  20. Survival of Juvenile Chinook Salmon Passing the Bonneville Dam Spillway in 2007

    Energy Technology Data Exchange (ETDEWEB)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Zimmerman, Shon A.; Durham, Robin E.; Fischer, Eric S.; Kim, Jina; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; McComas, Roy L.

    2008-12-01

    The U.S. Army Corps of Engineers Portland District (CENWP) funds numerous evaluations of fish passage and survival on the Columbia River. In 2007, the CENWP asked Pacific Northwest National Laboratory to conduct an acoustic telemetry study to estimate the survival of juvenile Chinook salmon passing the spillway at Bonneville Dam. This report documents the study results which are intended to be used to improve the conditions juvenile anadromous fish experience when passing through the dams that the Corps operates on the river.

  1. Comparison of textbook passages, nonfiction trade book passages and fiction trade book passages as instructional tools for learning science

    Science.gov (United States)

    Kelly, Cynthia

    This study examined the impact of different types of text on student achievement in elementary school science. Gender was also examined to see if the type of text passage read had any differential effect on boys' and girls' achievement. This study was a pretest/posttest/retention test design. Eighty-four fourth grade students from a public charter elementary school in South Florida were randomly assigned a passage from a physical science textbook, a physical science nonfiction trade book, a physical science fiction trade book, a biological science textbook or a biological science nonfiction trade book. Results in the physical science content area revealed that students in the textbook passage group had higher posttest and retention test results than students in the nonfiction and fiction trade book passage groups. There was no difference on the posttest results of students in the biological science textbook and nonfiction trade book passage groups. Students in the biological science textbook passage group had higher retention results than students in the biological science nonfiction passage group. Gender results in the physical science content area revealed that boys had a higher retention score than girls in the fiction trade book passage group. There were no gender achievement differences as a result of the text passage read in the biological science content area. It was concluded that no definitive answer as to the efficacy of textbooks versus trade books was possible based upon results of the study. Recommendations for future research include examining the effects of different types of texts in conjunction with other authentic teaching methods.

  2. Development of computational fluid dynamics--habitat suitability (CFD-HSI) models to identify potential passage--Challenge zones for migratory fishes in the Penobscot River

    Science.gov (United States)

    Haro, Alexander J.; Dudley, Robert W.; Chelminski, Michael

    2012-01-01

    A two-dimensional computational fluid dynamics-habitat suitability (CFD–HSI) model was developed to identify potential zones of shallow depth and high water velocity that may present passage challenges for five anadromous fish species in the Penobscot River, Maine, upstream from two existing dams and as a result of the proposed future removal of the dams. Potential depth-challenge zones were predicted for larger species at the lowest flow modeled in the dam-removal scenario. Increasing flows under both scenarios increased the number and size of potential velocity-challenge zones, especially for smaller species. This application of the two-dimensional CFD–HSI model demonstrated its capabilities to estimate the potential effects of flow and hydraulic alteration on the passage of migratory fish.

  3. Small farm dams: impact on river flows and sustainability in a context of climate change

    Science.gov (United States)

    Habets, F.; Philippe, E.; Martin, E.; David, C. H.; Leseur, F.

    2014-10-01

    The repetition of droughts in France has led to a growing demand for irrigation water and consequently to an increase in requests for the construction of small farm dams. Although such dams are small, their accumulation in a basin affects river flows, because the water collected in these small farm dams is used for irrigation and thus does not contribute to river flow. In order to gain more insight into their impact on the annual and monthly discharges, especially during dry years, a small farm dam model was built and connected to a hydrometeorological model. Several scenarios with different volume capacities, filling catchment sizes and filling periods were tested for such dams. The results were analysed in a small basin in western France, where the pressure for building such dams is high, and then extended to the entire country. It was found that, due to the hydrometeorological conditions (mainly low precipitation compared to other regions in France), the development of small farm dams in north-western France would result in greater decreases in river flows and less efficient filling of small farm dams than in other regions. Therefore, such dams might not be as efficient as expected in supplying water to farmers when needed. Moreover, the ability to fill small farm dams is projected to decrease in a context of climate change, despite the uncertainty on the evolution of precipitation, thus worsening the situation.

  4. The Politics, Development and Problems of Small Irrigation Dams in Malawi: Experiences from Mzuzu ADD

    Directory of Open Access Journals (Sweden)

    Bryson Gwiyani Nkhoma

    2011-10-01

    Full Text Available The paper examines the progress made regarding the development of small irrigation dams in Malawi with the view of establishing their significance in improving rural livelihoods in the country. The paper adopts a political economy theory and a qualitative research approach. Evidence from Mzuzu Agricultural Development Division (ADD, where small reservoirs acquire specific relevance, shows that despite the efforts made, the development of small dams is making little progress. The paper highlights that problems of top-down planning, high investment costs, negligence of national and local interests, over-dependency on donors, and conflicts over the use of dams – which made large-scale dams unpopular in the 1990s – continue to affect the development of small irrigation dams in Malawi. The paper argues that small irrigation dams should not be simplistically seen as a panacea to the problems of large-scale irrigation dams. Like any other projects, small dams are historically and socially constructed through interests of different actors in the local settings, and can only succeed if actors, especially those from formal institutions, develop adaptive learning towards apparent conflicting relations that develop among them in the process of implementation. In the case of Mzuzu ADD, it was the failure of the government to develop this adaptive learning to the contestations and conflicts among these actors that undermined successful implementation of small irrigation dams. The paper recommends the need to consider local circumstances, politics, interests, rights and institutions when investing in small irrigation dams.

  5. Risk assessment for large Romanian dams situated on Bistrita and Siret Rivers

    Science.gov (United States)

    Moldovan, Iren-Adelina; Petruta Constantin, Angela; Popescu, Emilia; Toma-Danila, Dragos; Otilia Placinta, Anica

    2015-04-01

    The work will present an ongoing national Project that have as final goal to provide the local emergency services with warnings of a potential dam failure and ensuing flood as a result of a large earthquake occurrence, allowing further public training for evacuation. Probabilistic seismic hazard (PSH), vulnerability and risk studies in 6 counties from Moldova region including Izvorul Muntelui Dam, down on Bistrita and following on Siret River and theirs affluent will be accomplished during the project. A number of 5 large dams (the most vulnerable) will be studied in detail and flooding maps will be drawn to find the most exposed downstream localities both for risk assessment studies and warnings. The results will consist in local and regional seismic information, dams specific characteristics and locations, seismic hazard maps and risk classes, for all dams sites (for more than 30 dams), inundation maps (for the most vulnerable 5 dams from the region) and possible affected localities. The maps will provide the best available estimate of the general location and extent of dam failure inundation areas and will tell if a specific location lies within a dam failure inundation zone. Besides periodical technical inspections, the monitoring and the surveillance of dams' related structures and infrastructures, there are some more seismic specific requirements towards dams' safety. The most important one is the seismic risk assessment that can be accomplished by rating the dams into seismic risk classes using the theory of Bureau and Ballentine (2002), and Bureau (2003), taking into account the maximum expected peak ground motions at the dams site. In this paper we will obtain the ground motion parameters in the dams locations using probabilistic hazard assessment techniques, the structures vulnerability and the downstream risk characteristics (human, economical, historic and cultural heritage, etc) in the areas that might be flooded in the case of a dam failure, and will

  6. Alameda Dam, Saskatchewan: Viability of a halt in construction

    International Nuclear Information System (INIS)

    Morgan, G.C.; Neill, C.R.

    1991-01-01

    A report is presented on the safety of halting construction of the 40 m high Alameda Dam in Saskatchewan. Pursuant to a series of legal and administrative proceedings, Environment Canada has been authorized to order a halt in construction of the dam. The safety implications of such an action are reviewed, particularly to determine the embankment crest elevation at which construction could safely be halted for a period of up to three months. A description is presented of principal features of the dam, site condition as of July 1991, flood hydrology and routing through the project, considerations for determining the safe height of the dam, downstream effects, and desirable conditions for the 1992 flood season. It is concluded that any halt in construction of the dam would have serious implications with respect to downstream impacts as well as integrity of the dam during the 1992 flood season. Risk of overtopping the embankment, halted at elevation 545 m, during a spring flood would be of the order of 1:4, with economic consequences amounting to millions of dollars. At a level of 557 m, risk of overtopping is reduced to the order of 1:50 to 1:100, however downstream consequences of a breach increase substantially. 6 refs

  7. Private investment for building a small hydropower plant at Zetea dam base

    International Nuclear Information System (INIS)

    Popa, Florica; Paraschivescu, Adina; Vladescu, Aurelia; Popa, Bogdan

    2007-01-01

    Zetea lake grading project comprises an earthen dam, made out of local materials, having as main purposes water supply, flood control and protection against flooding. The paper analyzes the possibility of building a small hydropower plant at the base of the dam, using private investment resources, in order to put to good use the water flow evacuated from the storage lake. (authors)

  8. 75 FR 30805 - Gibson Dam Hydroelectric Company, LLC; Notice Soliciting Comments, and Final Terms and Conditions...

    Science.gov (United States)

    2010-06-02

    ... Hydroelectric Company, LLC; Notice Soliciting Comments, and Final Terms and Conditions, Recommendations, and Prescriptions May 26, 2010. Take notice that the following hydroelectric application and applicant-prepared..., 2009. d. Applicant: Gibson Dam Hydroelectric Company, LLC. e. Name of Project: Gibson Dam Hydroelectric...

  9. Average-passage flow model development

    Science.gov (United States)

    Adamczyk, John J.; Celestina, Mark L.; Beach, Tim A.; Kirtley, Kevin; Barnett, Mark

    1989-01-01

    A 3-D model was developed for simulating multistage turbomachinery flows using supercomputers. This average passage flow model described the time averaged flow field within a typical passage of a bladed wheel within a multistage configuration. To date, a number of inviscid simulations were executed to assess the resolution capabilities of the model. Recently, the viscous terms associated with the average passage model were incorporated into the inviscid computer code along with an algebraic turbulence model. A simulation of a stage-and-one-half, low speed turbine was executed. The results of this simulation, including a comparison with experimental data, is discussed.

  10. Baseline studies in the Elwha River ecosystem prior to dam removal: Introduction to the special issue

    Science.gov (United States)

    Duda, Jeffrey J.; Freilich, Jerry; Schreiner, Edward G.

    2008-01-01

    The planned removal of two dams that have been in place for over 95 years on the Elwha River provides a unique opportunity to study dam removal effects. Among the largest dams ever considered for removal, this project is compelling because 83% of the watershed lies undisturbed in Olympic National Park. Eighteen million cubic meters of sediment have accumulated in and will be released from the reservoirs, and there is potential for rehabilitating depressed Pacific salmon runs. Researchers from academia, non-profit organizations, federal and state governments, and the Lower Elwha Klallam Tribe are currently assessing baseline ecological conditions of the Elwha River as part of dam removal studies. We introduce dam removal topics, provide a brief history of the dams, and summarize the ecology of the Elwha River basin as an introduction to a special issue devoted to research in the watershed.

  11. Aquatic organism passage at road-stream crossings—synthesis and guidelines for effectiveness monitoring

    Science.gov (United States)

    Hoffman, Robert L.; Dunham, Jason B.; Hansen, Bruce P.

    2012-01-01

    Restoration and maintenance of passage for aquatic organisms at road-stream crossings represents a major management priority, involving an investment of hundreds of millions of dollars (for example, U.S. Government Accounting Office, 2001). In recent years, passage at hundreds of crossings has been restored, primarily by replacing barrier road culverts with bridges or stream simulation culverts designed to pass all species and all life stages of aquatic life and simulate natural hydro-geomorphic processes (U.S. Forest Service, 2008). The current situation has motivated two general questions: 1. Are current design standards for stream simulation culverts adequately re-establishing passage for aquatic biota? and 2. How do we monitor and evaluate effectiveness of passage restoration? To address the latter question, a national workshop was held in March 2010, in Portland, Oregon. The workshop included experts on aquatic organism passage from across the nation (see table of participants, APPENDIX) who addressed four classes of methods for monitoring effectiveness of aquatic organism passage—individual movement, occupancy, demography, and genetics. This report has been written, in part, for field biologists who will be undertaking and evaluating the effectiveness of aquatic organism passage restoration projects at road-stream crossings. The report outlines basic methods for evaluating road-stream crossing passage impairment and restoration and discusses under what circumstances and conditions each method will be useful; what questions each method can potentially answer; how to design and implement an evaluation study; and points out the fundamental reality that most evaluation projects will require special funding and partnerships among researchers and resource managers. The report is organized into the following sections, which can be read independently: 1. Historical context: In this section, we provide a brief history of events leading up to the present situation

  12. Evaluation of Fish Passage Sites in the Walla Walla River Basin, 2008

    Energy Technology Data Exchange (ETDEWEB)

    Chamness, Mickie A. [Pacific Northwest National Laboratory

    2008-08-29

    In 2008, Pacific Northwest National Laboratory evaluated the Hofer Dam fish screen and provided technical assistance at two other fish passage sites as requested by the Bonneville Power Administration, the Walla Walla Watershed Council, or the Confederated Tribes of the Umatilla Indian Reservation. Evaluation of new sites such as Hofer Dam focuses on their design, construction, operation, and maintenance to determine if they effectively provide juvenile salmonids with safe passage through irrigation diversions. There were two requests for technical assistance in 2008. In the first, the Confederated Tribes of the Umatilla Indian Reservation requested an evaluation of the Nursery Bridge fish screens associated with the fish ladder on the east side of the Walla Walla River. One set of brushes that clean the screens was broken for an extended period. Underwater videography and water velocity measurements were used to determine there were no potential adverse effects on juvenile salmonids when the west set of screens was clean enough to pass water normally. A second request, received from the National Marine Fisheries Service and the Walla Walla Watershed Council, asked for evaluation of water velocities through relatively new head gates above and adjacent to the Eastside Ditch fish screens on the Walla Walla River. Water moving through the head gates and not taken for irrigation is diverted to provide water for the Nursery Bridge fish ladder on the east side of the river. Elevations used in the design of the head gates were incorrect, causing excessive flow through the head gates that closely approached or exceeded the maximum swimming burst speed of juvenile salmonids. Hofer Dam was evaluated in June 2008. PNNL researchers found that conditions at Hofer Dam will not cause impingement or entrainment of juvenile salmonids but may provide habitat for predators and lack strong sweeping flows to encourage juvenile salmonid passage downstream. Further evaluation of

  13. Proceedings of the Canadian Dam Association's 2006 annual conference: dams: past, present and future

    International Nuclear Information System (INIS)

    2006-01-01

    This conference addressed particular technical challenges regarding the operation of dams with particular focus on best practices for improving dam management and safety. It featured 4 workshops and a technical program led by experts on dams and tailings facilities that addressed topics such as dam construction, design and rehabilitation; dam management in a hydrological uncertainty context; monitoring, instrumentation and maintenance; dam behaviour; dam safety, dam failure and practical approaches to emergency preparedness planning for dam owners; historical aspects and environmental issues and conflicting water use. Recent developments in dam construction were reviewed along with discharge and debris management, tailings dam issues, asset management, seismic issues, public safety, seepage monitoring, flow control, dam rehabilitation, concrete testing, hydrotechnical issues, risk assessment methodology, and dam safety guidelines for extreme flood analyses and their applications. All 80 presentations from this conference have been catalogued separately for inclusion in this database. refs., tabs., figs

  14. Use of isotopes techniques during the life cycle of dams and reservoirs: cases in Latin American

    International Nuclear Information System (INIS)

    Leon, S.H.

    2006-01-01

    In fact, the combined use of isotope and conventional techniques is considered a reliable tool for studying problems related to dam safety and has become a new culture for civil / dam engineers, hydro geologists and researchers who involve in water resource management fields. The use of natural (environmental) and artificial isotopes as tracers together with systematic analyses of the hydrochemistry, electrical conductivity and temperature profiles data during the investigation and monitoring of leakage and seepage in dams and reservoirs are now becoming popular among the dam owners in seeking the best solution for dam related problems. Many studies and experiences worldwide on effective dam management programmes have indicated that any investigation about leakages and seepages are not possible to be accomplished successfully without synergic application of the conventional technologies and isotopic techniques. The major advancement in this area is the measurements study for establishment of baseline hydrogeology at each hydraulic work project like dams and reservoirs. The parameters include hydro chemicals, isotopic and geologic in each basin, river, reservoir, dams, tunnels and groundwater which provide high value information for decision making during all the stages in the life cycle of the dams. Many hydroelectric and water supply projects in latin america apply these investigation strategies. The main target is to investigate and understand the water movement around the dam and its vicinity. Then the specialised work teams will decide for the effective and economic monitoring activities and the implementation of the recommended remedial measures to ensure high standards of safety and security of the large dams and reservoirs. A typical example of specific leakage investigation of la Honda dam is briefly discussed. (Author)

  15. Role of the check dam in land development on the Loess Plateau, China

    Science.gov (United States)

    Xu, Xiang-Zhou; Zhang, Luo-Hao; Zhu, Tongxin; Dang, Tian-Min; Zhang, Hong-Wu; Xu, Shi-Guo

    2017-04-01

    Check dam is one of the most effective measures to reduce flow connectivity, which can retain soil and water, and increase land productivity. More than 100,000 check dams have been built on the Loess Plateau since 1950s. However, quantifying the effect of check dams on water resources and water environments remains a challenge. In this study, an in-depth field investigation together with a credible statistical analysis was carried out in two representative catchments on the Loess Plateau, Nanxiaohegou Catchment and Jiuyuangou Catchment, to assess the effectiveness of check dams in soil, water and nutrients conservation. The results show: (1) Check dam plays an important role in conserving water, soil, and nutrients on the Loess Plateau. About half of the total transported water and more than 80 % of the total transported soil and nutrients, had been locally retained in the selected catchments. Hence check dams had a significant benefit to improve soil fertility in the small watersheds, and reducing water pollution downstream of dams. (2) Compared to terrace farmlands, forest lands and grasslands, check-dam lands were much more important in conserving water, soil and nutrients in the catchments. Nearly 50% of the reduced water and more than 70% of the stored soil and nutrients in the study catchments were solely retained by the check dams, whereas the area of the dam lands was less than 7% of the total conservation land area. (3) Check dams are still effective in large storms even if dams were damaged by floods. It is often assumed that check dams could only retain sediment in small flood events whereas most of the stored soil may be washed out as the dams may be destroyed in a disastrous flood. Furthermore, if a major check dam, namely the key project dam, was built in the gully outlet, the flood could be controlled, and thereupon the dam-break can be also avoided. We suggest that a compensation and incentive policy be implemented on dam building to realize the

  16. 7 CFR 1724.55 - Dam safety.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Dam safety. 1724.55 Section 1724.55 Agriculture... § 1724.55 Dam safety. (a) The provisions of this section apply only to RUS financed electric system... for Dam Safety,”(Guidelines), as applicable. A dam, as more fully defined in the Guidelines, is...

  17. Dam safety from theory to practice

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    These proceedings on dam safety consists of 20 papers divided into seven sessions. The first session dealt with tailings dams; sessions 2 to 5 with technology transfer as related to dam safety; the sixth session with dam rehabilitation; and the last session with environmental concerns. The conference took place at Banff, Alberta, in October 1995.refs., figs., tabs

  18. Passage relevance models for genomics search

    Directory of Open Access Journals (Sweden)

    Frieder Ophir

    2009-03-01

    Full Text Available Abstract We present a passage relevance model for integrating syntactic and semantic evidence of biomedical concepts and topics using a probabilistic graphical model. Component models of topics, concepts, terms, and document are represented as potential functions within a Markov Random Field. The probability of a passage being relevant to a biologist's information need is represented as the joint distribution across all potential functions. Relevance model feedback of top ranked passages is used to improve distributional estimates of query concepts and topics in context, and a dimensional indexing strategy is used for efficient aggregation of concept and term statistics. By integrating multiple sources of evidence including dependencies between topics, concepts, and terms, we seek to improve genomics literature passage retrieval precision. Using this model, we are able to demonstrate statistically significant improvements in retrieval precision using a large genomics literature corpus.

  19. Skeptical notes on a physics of passage.

    Science.gov (United States)

    Huggett, Nick

    2014-10-01

    This paper investigates the mathematical representation of time in physics. In existing theories, time is represented by the real numbers, hence their formal properties represent properties of time: these are surveyed. The central question of the paper is whether the existing representation of time is adequate, or whether it can or should be supplemented: especially, do we need a physics incorporating some kind of "dynamical passage" of time? The paper argues that the existing mathematical framework is resistant to such changes, and might have to be rejected by anyone seeking a physics of passage. Then it rebuts two common arguments for incorporating passage into physics, especially the claim that it is an element of experience. Finally, the paper investigates whether, as has been claimed, causal set theory provides a physics of passage. © 2014 New York Academy of Sciences.

  20. Social impacts of Brazil's Tucurui Dam

    International Nuclear Information System (INIS)

    Fearnside, P.M.

    1999-01-01

    The Tucurui Dam, which blocked the Tocantins River in 1984 in Brazil's eastern Amazonian state of Para, is a continuing source of controversy. Most benefits of the power go to aluminum smelting companies, where only a tiny amount of employment is generated. Often presented by authorities as a model for hydroelectric development because of the substantial power that it produces, the project's social and environmental impacts are also substantial. Examination of Tucurui reveals a systematic overestimation of benefits and underestimation of impacts as presented by authorities. Tucurui offers many as-yet unlearned lessons for hydroelectric development in Amazonia

  1. Environmental design of the Olympic Dam operations

    International Nuclear Information System (INIS)

    Middleton, B.A.

    1989-01-01

    Environmental Design of The Olympic Dam Operations has been required to take into account the Environmental Management Programme as approved by the South Australian Government and radiological protection standards as determined by the Commonwealth of Australia's Code of Practice on Radiation Protection in the Mining and Milling of Radioactive Ores 1987. The article describes the natural environment, project assessment and infrastructure relating to the environmental design. The radiological standards refer to the control of exposure to radiation above naturally occurring background levels both for employees and for members of the public. 2 tabs., maps

  2. Repair and Rehabilitation of Dams: Case Studies

    Science.gov (United States)

    1999-09-01

    circuit video equipment was used to ensure the holes were drilled over the construction joints. A temporary joint sealant approved for potable use was...m- (20-ft-) long barrelled rods were used. The holes were then cleaned with potable water. Each hole was over-drilled by 0.9 m (3 ft) to allow for...reusable," Trends. Eau Claire, WI. Balogh, A. (1996). "Project profile: concrete changes the face of Theodore Roosevelt Dam," Concrete Construction 41(6

  3. Perspectives on dam safety in Canada

    International Nuclear Information System (INIS)

    Halliday, R.

    2004-01-01

    Canadian dam safety issues were reviewed from the perspective of a water resources engineer who is not a dam safety practitioner. Several external factors affecting dam safety were identified along with perceived problems in dam safety administration. The author claims that the main weakness in safety practices can be attributed to provincial oversights and lack of federal engagement. Some additions to the Canadian Dam Safety Guidelines were proposed to address these weaknesses. Canada has hundreds of large dams and high hazard dams whose failure would result in severe downstream consequences. The safety of dams built on boundary waters shared with the United States have gained particular attention from the International Joint Commission. This paper also examined safety criteria for concerns such as aging dams, sabotage and global climate change that may compromise the safety of a dam. 26 refs

  4. Brook trout passage performance through culverts

    Science.gov (United States)

    Goerig, Elsa; Castro-Santos, Theodore R.; Bergeron, Normand

    2016-01-01

    Culverts can restrict access to habitat for stream-dwelling fishes. We used passive integrated transponder telemetry to quantify passage performance of >1000 wild brook trout (Salvelinus fontinalis) attempting to pass 13 culverts in Quebec under a range of hydraulic and environmental conditions. Several variables influenced passage success, including complex interactions between physiology and behavior, hydraulics, and structural characteristics. The probability of successful passage was greater through corrugated metal culverts than through smooth ones, particularly among smaller fish. Trout were also more likely to pass at warmer temperatures, but this effect diminished above 15 °C. Passage was impeded at higher flows, through culverts with steep slopes, and those with deep downstream pools. This study provides insight on factors influencing brook trout capacity to pass culverts as well as a model to estimate passage success under various conditions, with an improved resolution and accuracy over existing approaches. It also presents methods that could be used to investigate passage success of other species, with implications for connectivity of the riverscape.

  5. Regional Assessment of Supplementation Project. Status report

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-01

    The Fish and Wildlife Program of the Northwest Power Planning Council (NPPC) prescribes several approaches to achieve its goal of doubling the salmon and steelhead runs of the Columbia River. Among those approaches are habitat restoration, improvements in adult and juvenile passage at dams and artificial propagation. Supplementation will be a major part of the new hatchery programs. The purpose of the Regional Assessment of Supplementation Project (RASP) is to provide an overview of ongoing and planned supplementation activities, to construct a conceptual framework and model for evaluating the potential benefits and risks of supplementation and to develop a plan for better regional coordination of research and monitoring and evaluation of supplementation. RASP has completed its first year of work. Progress toward meeting the first year`s objectives and recommendations for future tasks are contained in this report.

  6. The Three Gorges Dam Affects Regional Precipitation

    Science.gov (United States)

    Wu, Liguang; Zhang, Qiang; Jiang, Zhihong

    2006-01-01

    Issues regarding building large-scale dams as a solution to power generation and flood control problems have been widely discussed by both natural and social scientists from various disciplines, as well as the policy-makers and public. Since the Chinese government officially approved the Three Gorges Dam (TGD) projects, this largest hydroelectric project in the world has drawn a lot of debates ranging from its social and economic to climatic impacts. The TGD has been partially in use since June 2003. The impact of the TGD is examined through analysis of the National Aeronautics and Space Administration (NASA) Tropical Rainfall Measuring Mission (TRMM) rainfall rate and Moderate Resolution Imaging Spectroradiometer (MODIS) land surface temperature and high-resolution simulation using the Pennsylvania State University-National Center for Atmospheric Research (PSU-NCAR) fifth-generation Mesoscale Model (MM5). The independent satellite data sets and numerical simulation clearly indicate that the land use change associated with the TGD construction has increased the precipitation in the region between Daba and Qinling mountains and reduced the precipitation in the vicinity of the TGD after the TGD water level abruptly rose from 66 to 135 m in June 2003. This study suggests that the climatic effect of the TGD is on the regional scale (approx.100 km) rather than on the local scale (approx.10 km) as projected in previous studies.

  7. Smolt Monitoring at the Head of Granite Reservoir and Lower Granite Dam, 1989 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Nelson, V. Lance

    1990-04-01

    This project monitored the daily passage of chinook salmon Oncorhynchus tshawytscha and steelhead trout O. mykiss smolts during the 1989 spring outmigration at a migrant trap on the Snake River and the Clearwater River. Chinook salmon catch at the Snake River trap was much higher in 1989 than in either of the 1987 or 1988 drought years. The 1989 Snake River trap catch was similar to 1986. Effort was the same during the four years. Steelhead trout catch was greater than in any previous year. Chinook salmon and steelhead trout catch at the Clearwater River trap was similar to 1986, even though effort was greatly reduced in 1989 due to high runoff during most of the season. The 1989 Clearwater River trap catch was lower than in the two drought years (1987 and 1988) and was due to the minimal number of days the trap was operated. Fish tagged with Passive Interrogated Transponder (PIT) tags at the Snake River trap were recovered at the three dams (Lower Granite, Little Goose, and McNary) with PIT tag detection systems. Travel time (days) and migration rate (km/d) through Lower Granite Reservoir for PIT-tagged chinook salmon and steelhead trout, marked at the head of the reservoir, was affected by discharge. Statistical analysis showed that as discharge increased from 40 kcfs to 80 kcfs, chinook salmon travel time decreased three-fold and steelhead trout travel time decreased two-fold. 11 refs., 8 figs., 17 tabs.

  8. Distribution and abundance of freshwater decapods in an Atlantic rainforest catchment with a dammed future

    Directory of Open Access Journals (Sweden)

    E. F. Silva-Junior

    2017-03-01

    Full Text Available Abstract Variations in physical characteristics along the course of a river influence habitat availability which reflects in species distribution. Knowledge of ecology and diversity of lotic species is important for evaluating how river ecosystems will respond to environmental impacts. Freshwater decapods are a group of high ecological and economic importance, but the knowledge about factors influencing their distribution is scarce in Brazil. We performed a survey of decapods to describe their abundance and distribution as well as to study their relationships with stream physical variables and especially their association with different substrates types. We studied 23 sites located in 15 tributaries of Guapiaçú River, RJ, where we collected decapods in different substrates types and measured a set of physical variables. We found five decapods species, including amphidromous and non-amphidromous shrimps and crabs. Decapods were strongly associated with leaf-litter substrates and their abundance was related to a multivariate axis describing longitudinal changes in stream characteristics. We concluded that decapods occurring in the Guapiaçú catchment inhabit mainly small streams with preserved riparian forests where they find shelter and potential prey of invertebrates. The ongoing project to build a dam on the Guapiaçú River will have negative consequences to migrating shrimps and we strongly recommend that mitigating actions, such the construction of structures to allow the passage of migrating fauna, should be taken.

  9. 75 FR 61458 - Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments...

    Science.gov (United States)

    2010-10-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1494-386] Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and... August 16, 2010. d. Applicant: Grand River Dam Authority. e. Name of Project: Pensacola Hydroelectric...

  10. Dams and Levees: Safety Risks

    Science.gov (United States)

    Carter, N. T.

    2017-12-01

    The nation's flood risk is increasing. The condition of U.S. dams and levees contributes to that risk. Dams and levee owners are responsible for the safety, maintenance, and rehabilitation of their facilities. Dams-Of the more than 90,000 dams in the United States, about 4% are federally owned and operated; 96% are owned by state and local governments, public utilities, or private companies. States regulate dams that are not federally owned. The number of high-hazard dams (i.e., dams whose failure would likely result in the loss of human life) has increased in the past decade. Roughly 1,780 state-regulated, high-hazard facilities with structural ratings of poor or unsatisfactory need rehabilitation. Levees-There are approximately 100,000 miles of levees in the nation; most levees are owned and maintained by municipalities and agricultural districts. Few states have levee safety programs. The U.S. Army Corps of Engineers (Corps) inspects 15,000 miles of levees, including levees that it owns and local levees participating in a federal program to assist with certain post-flood repairs. Information is limited on how regularly other levees are inspected. The consequence of a breach or failure is another aspect of risk. State and local governments have significant authority over land use and development, which can shape the social and economic impacts of a breach or failure; they also lead on emergency planning and related outreach. To date, federal dam and levee safety efforts have consisted primarily of (1) support for state dam safety standards and programs, (2) investments at federally owned dams and levees, and (3) since 2007, creation of a national levee database and enhanced efforts and procedures for Corps levee inspections and assessments. In Public Law 113-121, enacted in 2014, Congress (1) directed the Corps to develop voluntary guidelines for levee safety and an associated hazard potential classification system for levees, and (2) authorized support for the

  11. Taking a new approach to dam building

    International Nuclear Information System (INIS)

    Taylor, D.

    1999-01-01

    Problems, including corruption, dogging construction of the Three Gorges dam being built in China are discussed. The article questions whether large hydro projects can ever be completed on time and within budget. It was suggested that by operating a build-operate-transfer scheme there might be greater incentives to complete on time but the vice-president of Skanska Civil Engineering was sceptical due to the risk involved. Through the Three Gorges Project, the Chinese government has learned that the relocation of thousands of people is far from easy. From a technical aspect, there may be unexpected problems in building underground. Some problems which arose in major hydro projects in India, Turkey and Lesotho were recounted. The vice-president of Skanska offered three pieces of advice and they are listed. (UK)

  12. Panama Canal Watershed Experiment- Agua Salud Project

    Science.gov (United States)

    Stallard, Robert F.; Ogden, Fred L.; Elsenbeer, Helmut; Hall, Jefferson S.

    2010-01-01

    The Agua Salud Project utilizes the Panama Canal’s (Canal) central role in world commerce to focus global attention on the ecosystem services provided by tropical forests. The Canal was one of the great engineering projects in the world. Completed in 1914, after almost a decade of concerted effort, its 80 km length greatly shortened the voyage between the Atlantic and Pacific Oceans. An entire class of ships, the Panamax, has been constructed to maximize the amount of cargo that can be carried in a Canal passage. In today’s parlance, the Canal is a “green” operation, powered largely by water (Table 1). The locks, three pairs on each end with a net lift of 27 meters, are gravity fed. For each ton of cargo that is transferred from ocean to ocean, about 13 tons of water (m3) are used. Lake Gatún forms much of the waterway in the Canal transect. Hydroelectricity is generated at the Gatún dam, whenever there is surplus water, and at Madden Dam (completed in 1936) when water is transferred from Lake Alhajuela to Lake Gatún. The Canal watershed is the source of drinking water for Panama City and Colon City, at either end of the Canal, and numerous towns in between.

  13. Dam Removal Information Portal (DRIP)—A map-based resource linking scientific studies and associated geospatial information about dam removals

    Science.gov (United States)

    Duda, Jeffrey J.; Wieferich, Daniel J.; Bristol, R. Sky; Bellmore, J. Ryan; Hutchison, Vivian B.; Vittum, Katherine M.; Craig, Laura; Warrick, Jonathan A.

    2016-08-18

    The removal of dams has recently increased over historical levels due to aging infrastructure, changing societal needs, and modern safety standards rendering some dams obsolete. Where possibilities for river restoration, or improved safety, exceed the benefits of retaining a dam, removal is more often being considered as a viable option. Yet, as this is a relatively new development in the history of river management, science is just beginning to guide our understanding of the physical and ecological implications of dam removal. Ultimately, the “lessons learned” from previous scientific studies on the outcomes dam removal could inform future scientific understanding of ecosystem outcomes, as well as aid in decision-making by stakeholders. We created a database visualization tool, the Dam Removal Information Portal (DRIP), to display map-based, interactive information about the scientific studies associated with dam removals. Serving both as a bibliographic source as well as a link to other existing databases like the National Hydrography Dataset, the derived National Dam Removal Science Database serves as the foundation for a Web-based application that synthesizes the existing scientific studies associated with dam removals. Thus, using the DRIP application, users can explore information about completed dam removal projects (for example, their location, height, and date removed), as well as discover sources and details of associated of scientific studies. As such, DRIP is intended to be a dynamic collection of scientific information related to dams that have been removed in the United States and elsewhere. This report describes the architecture and concepts of this “metaknowledge” database and the DRIP visualization tool.

  14. Radiological assessment of dam water and sediments for natural ...

    African Journals Online (AJOL)

    Radiological assessment of dam water and sediments for natural radioactivity and its overall health detriments. ... No artificial gamma emitting radionuclide was detected in the samples. The projected ... However, the chances of radiological hazard to the health of human from radioactivity in the soil were generally low.

  15. What about dams and water reservoirs - to build or to demolish them?

    International Nuclear Information System (INIS)

    Paskalov, Trifun

    2001-01-01

    The paper deals with the problem arising from the action taken by the World Commission of Dams (WCD) to abandon any activity of planning, designing, building and maintaining large dams stipulating some problems from totally negativistic point of view. Under the umbrella of 'Cost of Dams' they are pointing out the following problems: 1. Millions of people have been displaced from their homes each year from large dams. Many were not resettled and those that were rarely had their livelihoods restored. Compensation has in many cases been either non-existent or inadequate. 2. Impact on communities downstream was often significant and was not addressed adequately in planning and design of large dams. 3. Large dams have had extensive impacts on rivers, watershed and aquatic ecosystems and efforts to mitigate these have met with limited success. 4. While there was variability from one project to next, a considerable portion of large dams have fallen short of physical and economic targets with a high tendency to cost overruns. From the other side, to the above provocative questions the International Commission of Large Dams (ICOLD) did not stayed indifferent but took an active action stipulating all the benefits, as well as the concerns about dams from a general point of view. These steps of ICOLD and the views of the writer of this paper are discussed in the following text. (Original)

  16. Numerical modelling of solid transport caused by an extreme flood: Case of the Hamiz dam failure (Algeria

    Directory of Open Access Journals (Sweden)

    Haddad Ali

    2017-07-01

    Full Text Available Study of solid transport caused by the flow of an extreme flood such as the propagation of dam failure wave aims to simulate the hydrodynamics behaviour of the solid particles contained in the valley during the flood passage. With this intention, we have developed a numerical model which is based on the resolution of the one-dimensional Saint Venant–Exner equations by the implicit finite difference scheme. Numerical stability of liquid phase calculation is checked by the Courant number and De Vries condition for the solid phase. The model has been applied to the Hamiz dam (Algeria which is built in the semi arid zone and presents a major risk of failure. The simulation of several scenarios of dam failure has allowed us to trace the cartography of sediment transport in the valley which is induced by the flood of dam failure.

  17. Workshop 5 (synthesis): dams, environment and regional development.

    Science.gov (United States)

    Söderbaum, Peter

    2002-01-01

    Dams are controversial: their positive results include electricity generation, flood control, and irrigation; negative effects include population displacement and ecological impacts. A fair assessment can only be made on a case by case basis, judging individual projects in their individual context, and using holistic and interdisciplinary approaches. Decisions can no longer be taken purely on technical considerations, ethical issues must be incorporated into the decision-making process. The report of the World Commission on Dams was recognised as a significant move in the right direction.

  18. Determination of filtrations and permeability of an earth dam

    International Nuclear Information System (INIS)

    Gomez, H.R.; Baro, G.B.; Gillen, Ricardo.

    1975-11-01

    The aim of this work was to measure with the aid of a radioactive tracer the speed flow of the water filtrating from Sumampa Dam in northeastern Catamarca, while being in operation, and with these data determine if the actual permeability corresponds to the projected one. Iodine-131 was used as tracer and periodical samples were taken from the down stream water in order to determine its activity concentration. In previous perforations ionic interchange resines were used so as to measure simultaneously the fixed Iodine-131. The permeability of the dam was calculated from the obtained speed based on time-concentration curves and applying Darcy formulas for permeability. (author) [es

  19. LGR adult trap data - Operation of the adult trap at Lower Granite Dam

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This Bonneville Power Administration (BPA) - funded project pays for NOAA staff to operate the adult salmon trap located in the fish ladder at Lower Granite Dam. The...

  20. Seismic risk assessment for Poiana Uzului (Romania) buttress dam on Uz river

    Science.gov (United States)

    Moldovan, Iren-Adelina; Toma-Danila, Dragos; Paerele, Cosmin Marian; Emilian Toader, Victorin; Petruta Constantin, Angela; Ghita, Cristian

    2017-04-01

    The most important specific requirements towards dams' safety is the seismic risk assessment. This objective will be accomplished by rating the dams into seismic risk classes using the theory of Bureau and Ballentine, 2002, and Bureau (2003), taking into account the maximum expected peak ground motions at dams' site, the structures vulnerability and the downstream risk characteristics. The maximum expected values for ground motions at dams' site have been obtained using probabilistic seismic hazard assessment approaches. The structural vulnerability was obtained from dams' characteristics (age, high, water volume) and the downstream risk was assessed using human, economical, touristic, historic and cultural heritage information from the areas that might be flooded in the case of a dam failure. A couple of flooding scenarios have been performed. The results of the work consist of local and regional seismic information, specific characteristics of dam, seismic hazard values for different return periods and risk classes. The studies realized in this paper have as final goal to provide in the near future the local emergency services with warnings of a potential dam failure and ensuing flood as a result of a large earthquake occurrence, allowing further public training for evacuation. Acknowledgments This work was partially supported by the Partnership in Priority Areas Program - PNII, under MEN-UEFISCDI, DARING Project no. 69/2014 and the Nucleu Program - PN 16-35, Project no. 03 01 and 01 06.

  1. An experimental database for the dynamic behaviour of concrete dams

    International Nuclear Information System (INIS)

    Paultre, P.; Proulx, J.; Charbonneau, C.; Phat, T. M.

    1997-01-01

    A research project focusing on the development of a reliable experimental database for the dynamic behaviour of concrete dams, using forced-vibration testing, is described. Test results are presented for the Beauharnois Dam located near Montreal (22 m high) and the Outardes 3 Dam, located in north-eastern Quebec (84 m high). The latter was tested in both summer and under severe winter conditions. The methodology and instrumentation are described, along with the implications of the numerical correlation studies. Results show that forced-vibration test results can provide valuable insight into the participation of various subsystems in a complex structure by yielding the necessary calibration parameters for the numerical models. 9 refs., 10 figs

  2. Characterization of Gatewell Orifice Lighting at the Bonneville Dam Second Powerhouse and Compendium of Research on Light Guidance with Juvenile Salmonids

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Robert P.; Simmons, Mary Ann

    2007-12-29

    The goal of the study described in this report is to provide U.S. Army Corps of Engineers (USACE) biologists and engineers with general design guidelines for using artificial lighting to enhance the passage of juvenile salmonids into the collection channel at the Bonneville Dam second powerhouse (B2). During fall 2007, Pacific Northwest National Laboratory (PNNL) researchers measured light levels in the field at one powerhouse orifice through which fish must pass to reach the collection channel. Two light types were evaluated—light-emitting diode (LED) lights and halogen spot lights. Additional measurements with mercury lamps were made at the PNNL Aquatic Research Laboratory to determine baseline intensity of the current lighting. A separate chapter synthesizes the relevant literature related to light and fish guidance for both field and laboratory studies. PNNL will also review the Corps plans for existing lighting protocol at all of the Portland District projects and help develop a uniform lighting scheme which could be implemented. The specific objectives for this study are to 1. Create a synthesis report of existing lighting data for juvenile salmonid attraction and deterrence and how the data are used at fish bypass facilities. 2. Evaluate current B2 orifice lighting conditions with both LED and halogen sources. 3. Make recommendations as to what lighting intensity, source, and configuration would improve passage at the B2 orifices. 4. Review USACE plans for retrofit of existing systems (to be assessed at a later date).

  3. Experimental demonstration of composite adiabatic passage

    Science.gov (United States)

    Schraft, Daniel; Halfmann, Thomas; Genov, Genko T.; Vitanov, Nikolay V.

    2013-12-01

    We report an experimental demonstration of composite adiabatic passage (CAP) for robust and efficient manipulation of two-level systems. The technique represents a altered version of rapid adiabatic passage (RAP), driven by composite sequences of radiation pulses with appropriately chosen phases. We implement CAP with radio-frequency pulses to invert (i.e., to rephase) optically prepared spin coherences in a Pr3+:Y2SiO5 crystal. We perform systematic investigations of the efficiency of CAP and compare the results with conventional π pulses and RAP. The data clearly demonstrate the superior features of CAP with regard to robustness and efficiency, even under conditions of weakly fulfilled adiabaticity. The experimental demonstration of composite sequences to support adiabatic passage is of significant relevance whenever a high efficiency or robustness of coherent excitation processes need to be maintained, e.g., as required in quantum information technology.

  4. Damming the rivers of the Amazon basin.

    Science.gov (United States)

    Latrubesse, Edgardo M; Arima, Eugenio Y; Dunne, Thomas; Park, Edward; Baker, Victor R; d'Horta, Fernando M; Wight, Charles; Wittmann, Florian; Zuanon, Jansen; Baker, Paul A; Ribas, Camila C; Norgaard, Richard B; Filizola, Naziano; Ansar, Atif; Flyvbjerg, Bent; Stevaux, Jose C

    2017-06-14

    More than a hundred hydropower dams have already been built in the Amazon basin and numerous proposals for further dam constructions are under consideration. The accumulated negative environmental effects of existing dams and proposed dams, if constructed, will trigger massive hydrophysical and biotic disturbances that will affect the Amazon basin's floodplains, estuary and sediment plume. We introduce a Dam Environmental Vulnerability Index to quantify the current and potential impacts of dams in the basin. The scale of foreseeable environmental degradation indicates the need for collective action among nations and states to avoid cumulative, far-reaching impacts. We suggest institutional innovations to assess and avoid the likely impoverishment of Amazon rivers.

  5. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004

    International Nuclear Information System (INIS)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems

  6. Reliability and Robustness Analysis of the Masinga Dam under Uncertainty

    Directory of Open Access Journals (Sweden)

    Hayden Postle-Floyd

    2017-02-01

    Full Text Available Kenya’s water abstraction must meet the projected growth in municipal and irrigation demand by the end of 2030 in order to achieve the country’s industrial and economic development plan. The Masinga dam, on the Tana River, is the key to meeting this goal to satisfy the growing demands whilst also continuing to provide hydroelectric power generation. This study quantitatively assesses the reliability and robustness of the Masinga dam system under uncertain future supply and demand using probabilistic climate and population projections, and examines how long-term planning may improve the longevity of the dam. River flow and demand projections are used alongside each other as inputs to the dam system simulation model linked to an optimisation engine to maximise water availability. Water availability after demand satisfaction is assessed for future years, and the projected reliability of the system is calculated for selected years. The analysis shows that maximising power generation on a short-term year-by-year basis achieves 80%, 50% and 1% reliability by 2020, 2025 and 2030 onwards, respectively. Longer term optimal planning, however, has increased system reliability to up to 95% in 2020, 80% in 2025, and more than 40% in 2030 onwards. In addition, increasing the capacity of the reservoir by around 25% can significantly improve the robustness of the system for all future time periods. This study provides a platform for analysing the implication of different planning and management of Masinga dam and suggests that careful consideration should be given to account for growing municipal needs and irrigation schemes in both the immediate and the associated Tana River basin.

  7. Group prepares guidelines for documenting dam performance

    International Nuclear Information System (INIS)

    McCann, M.W. Jr.

    1993-01-01

    The Association of State Dam Safety Officials and the Center on the Performance of Dams at Stanford University later this summer expect to complete guidelines for reporting the performance of state, federal, and private dams: A working group of state and federal dam safety engineers and consultants is developing the guidelines to identify incidents that should be reported and to establish reporting requirements. The Federal Emergency Management Agency (FEMA) is funding preparation and publication of the guidelines. The guidelines are expected to expedite the process for reporting information on dam incidents in a timely and complete manner. Much the same as the health care industry compiles and evaluates data related to the incidence of disease and the benefits of treatment, a single standard for reporting the performance of dams in the US will help create a national information base on the occurrence and consequence of dam incidents. Currently, incidents involving dam performance are not reported on a regular basis. The guidelines will define dam incidents in terms of events of engineering interest that provide insights to the safety and structural or operational integrity of dams. Examples of incidents include the performance of a dam that experiences ground motion from a large earthquake, extreme spillway or dam overtopping, rehabilitations made to satisfy dam safety requirements, embankment sliding of an earthen dam, and improper operations that leads to damage downstream. When an incident occurs, the satisfactory or unsatisfactory performance of a dam will be reported, either by a state dam safety official, the owner of the dam, or the owner's engineer

  8. National Dam Safety Program. Watervliet Upper Dam (Inventory Number N.Y. 1356), Lower Hudson River Basin, Albany County, New York. Phase I Inspection Report,

    Science.gov (United States)

    1981-07-29

    Program Watervliet Upper Dam Visul ispecion o"Albany County Hy.1 Visual 7 TStrcturlnii-- Lower Hudson River Basii 2O~ AN~ ~ - ~ ~ - ~ fe. 𔃼~ -- t7...1407 LOWER HUDSON RIVER BASIN TABLE OF CONTENTS PAGE NO. - ASSESSMENT - OVERVIEW PHOTOGRAPH 1 PROJECT INFORMATION 1 1.1 GENERAL 1 1.2 DESCRIPTION OF...inspection and maintenance of the dam and appurtenances. Document this information for future reference. 6. An emergency action plan must be developed. I

  9. Dams and Obstructions along Iowa's Canoe Routes

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — This dataset represents obstruction to canoe and boat users of the canoe routes of Iowa. This may represent actual dams, rock dams (natural or man made), large...

  10. Simulation of Breach Outflow for Earthfill Dam

    International Nuclear Information System (INIS)

    Razad, Azwin Zailti Abdul; Muda, Rahsidi Sabri; Sidek, Lariyah Mohd; Azia, Intan Shafilah Abdul; Mansor, Faezah Hanum; Yalit, Ruzaimei

    2013-01-01

    Dams have been built for many reasons such as irrigation, hydropower, flood mitigation, and water supply to support development for the benefit of human. However, the huge amount of water stored behind the dam can seriously pose adverse impacts to the downstream community should it be released due to unwanted dam break event. To minimise the potential loss of lives and property damages, a workable Emergency Response Plan is required to be developed. As part of a responsible dam owner and operator, TNB initiated a study on dam breach modelling for Cameron Highlands Hydroelectric Scheme to simulate the potential dam breach for Jor Dam. Prediction of dam breach parameters using the empirical equations of Froehlich and Macdonal-Langridge-Monopolis formed the basis of the modelling, coupled with MIKE 11 software to obtain the breach outflow due to Probable Maximum Flood (PMF). This paper will therefore discuss the model setup, simulation procedure and comparison of the prediction with existing equations.

  11. Douglas County Dam Breach Inundation Areas

    Data.gov (United States)

    Kansas Data Access and Support Center — Dam breach analysis provides a prediction of the extent and timing of flooding from a catastrophic breach of the dams. These results are sufficient for developing...

  12. Viewpoint – Butterflies vs. Hydropower: Reflections on Large Dams in Contemporary Africa

    Directory of Open Access Journals (Sweden)

    Henry Shirazu Alhassan

    2009-02-01

    Full Text Available The current acute needs for improved water resources and energy management in the contemporary development of Africa has renewed the interest in large dams in recent times, especially in the energy sector, because of the Millennium Development Goals (MDGs, concern about climate change, the variability in crude oil prices and alternative sources of funding for large dams. So, the rethink about large dams as an energy source in the face of fluctuations in the cost of crude oil and climate change is also based on finding cheaper and renewable sources of electricity. However, the renewable credentials of large dams, and their compatibility with sustainable development, are disputed. Using the Akosombo dam and the Bui dam project – both in Ghana – as case studies, this paper analyses the potential and significance of large dams within the ambit of Africa’s contemporary development. The paper argues that despite criticisms of large dams and the promotion of alternatives, large dams are still very important to Africa’s development as they are technologies with well known positive and negative socio-economic and environmental impacts which could be mitigated. The alternatives to large dams, in contrast, have relatively unknown long-term socio-economic and environmental impacts. In addition, there is scepticism among local people and other stakeholders about the alternatives to large hydropower dams because of the impression that some western-backed non-governmental organisations (NGOs, some northern countries, and some multilateral and bilateral institutions are intentionally seeking to undermine significant development in Ghana and other African countries.

  13. Navigable windows of the Northwest Passage

    Science.gov (United States)

    Liu, Xing-he; Ma, Long; Wang, Jia-yue; Wang, Ye; Wang, Li-na

    2017-09-01

    Artic sea ice loss trends support a greater potential for Arctic shipping. The information of sea ice conditions is important for utilizing Arctic passages. Based on the shipping routes given by ;Arctic Marine Shipping Assessment 2009 Report;, the navigable windows of these routes and the constituent legs were calculated by using sea ice concentration product data from 2006 to 2015, by which a comprehensive knowledge of the sea ice condition of the Northwest Passage was achieved. The results showed that Route 4 (Lancaster Sound - Barrow Strait - Prince Regent Inlet and Bellot Strait - Franklin Strait - Larsen Sound - Victoria Strait - Queen Maud Gulf - Dease Strait - Coronation Gulf - Dolphin and Union Strait - Amundsen Gulf) had the best navigable expectation, Route 2 (Parry Channel - M'Clure Strait) had the worst, and the critical legs affecting the navigation of Northwest Passage were Viscount Melville Sound, Franklin Strait, Victoria Strait, Bellot Strait, M'Clure Strait and Prince of Wales Strait. The shortest navigable period of the routes of Northwest Passage was up to 69 days. The methods used and the results of the study can help the selection and evaluation of Arctic commercial routes.

  14. Bird of Passage at Four Universities

    Indian Academy of Sciences (India)

    IAS Admin

    RESONANCE │ May 2010. GENERAL │ ARTICLE. Bird of Passage at Four Universities. Student Days of Rudolph Peierls. G Baskaran. Keywords. Peierls, Sommerfeld, Heisen- berg, Pauli, theoretical physics, electron theory of solids. G Baskaran is a theoretical physicist. This article is his first contribution to. Resonance.

  15. Climate change effects on design floods for dams in Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Andreasson, J.; Bergstroem, S. [Swedish Meteorological and Hydrological Inst., Norrkoeping (Sweden)

    2008-07-01

    Since 1990 new guidelines for hydrological design of the Swedish hydropower system are being implemented. The technique is based on a critical combination of extreme precipitation, extreme snowmelt and an operation strategy for multi-reservoir systems. Hydrological modeling is a central component, as is a prescribed design precipitation sequence. At the time when the guidelines were developed it was not possible to account for possible consequences of a changing climate. Sensitivity analyses using four different regional climate change scenarios (2071-2100) has been carried out for four important Swedish dams and also for the largest lake in Sweden, Lake Vanern. The research project was financed by Elforsk and the Swedish Dam Safety Authority (Svenska Kraftnat) and it was reported in 2006/2007. Some summarizing conclusions are: Changes in the mean climate results in smaller design snow pack according to all scenarios. This component acts towards decreased design inflows and water levels at most locations. Extreme precipitation can be expected to increase at most places in Sweden according to the climate scenarios. This component acts towards increased design inflows and water levels at most locations. Depending on how changes in the mean climate and in the extremes interact, the change in design inflows and water levels can be either an increase or a decrease. The effect depends both on the location of the dam and on the choice of climate scenario. This calls for site-specific analysis for each dam. In 2007 the second edition of the guidelines for hydrological design was issued in which also the question of climate change have been addressed. The first sensitivity analyses are now being extended within a new 2-year research project also funded jointly by Elforsk and the Swedish Dam Safety Authority (Svenska Kraftnat). The aim is to increase the number of regional climate scenarios and the number of high hazard dams in the analysis, but also to move the scenarios

  16. Australian experience of providing for fish passage at small instream structures

    International Nuclear Information System (INIS)

    Lewis, B.

    2006-01-01

    Various instream structures have been constructed in Australia as a result of increasing agricultural activities. However, even small structures such as culverts and stream gauging stations can restrict essential fish movements and result in the extinction of local fish species. This paper discussed methods of modifying and designing new structures to ensure adequate fish passage. It was suggested that instream structures can provide for fish passage through the provision of bridges, or through the use of low profile structures for small weirs. Recommendations for site-specific instream structures included an assessment of fish species, topography, flow characteristics and cost effectiveness. Solutions for reducing the impact of small instream barriers to fish movement were also discussed. Provision for fish passage is an important consideration for planners and designers of dams. Legislation is now in place to ensure a planning and approval process prior to the commencement of construction and operation. It was concluded that significant works are now being undertaken to restore fish migration pathways caused by barriers that restrict fish movement. However, monitoring is needed to ensure that designs operate effectively. 17 refs., 3 figs

  17. The economic impact of the Olympic Dam development

    International Nuclear Information System (INIS)

    Cook, L.H.; Trengove, C.D.

    1982-01-01

    The copper-uranium-gold deposit at Olympic Dam on the Roxby Downs Station, South Australia, was discovered in July 1975. Production technology, safety during mining and processing and the nature and extent of government involvement are discussed. Factors influencing the optimal scale of the project are considered and indicative calculations are made of project costs under a range of assumptions. Social issues raised by the project include lease allocation, taxation, infrastructure and the use of indenture agreements. An analysis is undertaken of the project's expected employment and production effects in South Australia using input/output modelling techniques

  18. Social and environmental aspects of the Manantali dam. Retrospective assessment

    International Nuclear Information System (INIS)

    Ficatier, Yves; Niasse, Madiodio

    2008-04-01

    After the great drought of the 1970's, and in order to better exploit the water resources of the Senegal river basin, an important project had been launched which comprises the Diama and Manantali dams, the construction or rehabilitation of dikes, and the construction of a hydroelectric plant for the Manantali dam. In order to provide a retrospective assessment of the social and environmental aspects (impacts on agriculture, fishing, electricity production, water availability, and so on) associated with the Manantali dam, this study reports an analysis of major advances and problems noticed at the social and environmental level in the Senegal river basin, an assessment of negative and positive social and environmental impacts of various components of the project achieved with the financial support of French and German institutions (deforestation, construction of both dams, of dikes, and of the energy equipment), an analysis of the way these social and environmental impacts have been managed all along the planning and realisation process, an assessment of social and environmental impacts of the program as a whole (impact studies, realisation, noticed impacts, efficiency in impact management), an analysis of the way existing standards of the moment have been taken into account in the management of environmental issues, and a global assessment of the program according to criteria defined by the DAC (Development Assistance Committee) of the OECD: relevance, efficiency, impact on development, and sustainability

  19. WinDAM C earthen embankment internal erosion analysis software

    Science.gov (United States)

    Two primary causes of dam failure are overtopping and internal erosion. For the purpose of evaluating dam safety for existing earthen embankment dams and proposed earthen embankment dams, Windows Dam Analysis Modules C (WinDAM C) software will simulate either internal erosion or erosion resulting f...

  20. Dams life; La vie des barrages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The paper reports on the conclusions of decennial and annual inspections of French dams. Dams surveillance is performed by the operators and consists in visual examinations and measurements. Concrete dams, in particular, always have more or less developed fissures with water sweating threw the concrete mass or the foundations. Old concrete often show low swelling phenomena which are measured too. (J.S.)

  1. EVALUASI KEAMANAN DAM JATILUHUR BERBASIS INDEKS RESIKO

    Directory of Open Access Journals (Sweden)

    Avazbek Ishbaev

    2014-12-01

    Full Text Available The dams have very important roles to agricultural activities. Especially, West Java with 240,000 hectares of agricultural land, needs a good dam structure that can be used sustainably. Jatiluhur dam in Purwakarta, West Java is one of big dams in Indonesia which has important rules not only for Purwakarta but also for Jakarta, Karawang and Bekasi residents. A study and observation about safety and dam stability is needed to prevent any damage. The purpose of this research were to identify parameters that influenced dam safety and to evaluate dam reliability based on index tools. Analysis was done using risk index tools. The result showed that the condition of the dam of Jatiluhur is still satisfied with indicators, "Idam"-750. The total index risk was 127.22 and the safety factor was 83.04 out of 100. Therefore, Jatiluhur dam could be classified as safe and no need for particular treatments. Jatiluhur dam can be operated in normal condition or abnormal condition with periodic monitoring. Keywords: dam safety, evaluation, Jatiluhur Dam, risk index tools

  2. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 1993 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Brimmer, Arnold F.

    1995-03-01

    This project monitored the daily passage of chinook salmon Oncorhynchus tshawytscha and steelhead trout O. mykiss smolts during the 1993 spring outmigration at migrant traps on the Snake River, Clearwater River and Salmon River.

  3. Seismic hazard and risk assessment for large Romanian dams situated in the Moldavian Platform

    Science.gov (United States)

    Moldovan, Iren-Adelina; Popescu, Emilia; Otilia Placinta, Anica; Petruta Constantin, Angela; Toma Danila, Dragos; Borleanu, Felix; Emilian Toader, Victorin; Moldoveanu, Traian

    2016-04-01

    public training for evacuation. The work is supported from PNII/PCCA 2013 Project DARING 69/2014, financed by UEFISCDI, Romania. Bureau GJ (2003) "Dams and appurtenant facilities" Earthquake Engineering Handbook, CRS Press, WF Chen, and C Scawthorn (eds.), Boca Raton, pp. 26.1-26.47. Bureau GJ and Ballentine GD (2002) "A comprehensive seismic vulnerability and loss assessment of the State of Carolina using HAZUS. Part IV: Dam inventory and vulnerability assessment methodology", 7th National Conference on Earthquake Engineering, July 21-25, Boston, Earthquake Engineering Research Institute, Oakland, CA. Moldovan IA, Popescu E, Constantin A (2008), "Probabilistic seismic hazard assessment in Romania: application for crustal seismic active zones", Romanian Journal of Physics, Vol.53, Nos. 3-4

  4. Creating recreational amenities at your dam: thinking outside the box

    Energy Technology Data Exchange (ETDEWEB)

    Post, Gavin C. [Northest Hydraulics Consultants, Edmonton, (Canada)

    2010-07-01

    Public safety around dams is challenging for the operators. The creation of recreational amenities may be a compromise between river users and the necessity for managed water resources. The establishment of such recreational amenities could play a part in the decommissioning and remediation of aging installations, revitalization of river sections and development of hydropower facilities. This paper discussed the recent concept of creating recreational amenities at hydraulic structures. This review summarized the lessons learned from natural analogues and laboratory research to re-evaluate future and existing facilities on the basis of recreational possibilities. The white-water parks have proven to be a viable way to modify existing hydraulic structures and revitalize urban river corridors while maintaining or improving fish passage. The parks designed with paddlers in mind were especially appreciated. The remediation of the Calgary Weir on the Bow River, the largest and most public example, illustrated the use of recreational amenities for remediation process.

  5. The impact of Merowe Dam on Simulium hamedense vector of onchocerciasis in Abu Hamed focus - Northern Sudan.

    Science.gov (United States)

    Zarroug, Isam M A; Elaagip, Arwa H; Abuelmaali, Sara A; Mohamed, Hanan A; ElMubarak, Wigdan A; Hashim, Kamal; Deran, Tong Chor M; Aziz, Nabil; Higazi, Tarig B

    2014-04-04

    Abu Hamed, the northernmost onchocerciasis focus in the world, is located along the River Nile banks in the Nubian Desert. Hydroelectric dams can alter activity of black flies and may provide breeding sites for black fly. Merowe Dam, the largest hydropower project in Africa, was built west of Abu Hamed focus in 2009. The impact of the Dam on onchocerciasis and its black fly vectors in Abu Hamed focus was measured in this study. Entomological surveys for aquatic stages and adult Simulium hamedense were conducted before and after the inception of Merowe Dam in 2007/2008 and 2010/2011. There was no black fly breeding or adult activity in the previously known breeding sites upstream of the Merowe Dam with the western most breeding site found in AlSarsaf village near the center of the focus. No adult or aquatic stages of black flies were found downstream of the Dam. The artificial lake of the Dam flooded all the breeding sites in the western region of the focus and no aquatic stages and/or adult black fly activity were established in the study area upstream of the Dam. The Dam seems to have positive impact on onchocerciasis and its black fly vectors in Abu Hamed focus. These outcomes of the Merowe Dam might have contributed to the recently declared interruption of onchocerciasis transmission in Abu Hamed focus. Continuous entomological surveys are needed to monitor presence of black fly vectors and its impact on the disease.

  6. Large dams and risk management

    International Nuclear Information System (INIS)

    Cazelais, N.

    2003-01-01

    In July 1996, Quebec's Saguenay region was subjected to intensive rainfall which caused severe floods and uncontrolled release of several reservoirs, resulting in extensive damage to dam structures and reservoirs. The probability of occurrence for that disaster was 1:10,000. Following the disaster, the Quebec government established a dam management body entitled the Commission scientifique et technique sur la gestion des barrages, which pointed out several safety shortcomings of existing dams. Many were either very old or had undergone significant function change without being subsequently re-evaluated. A report by the Commission stated that damage following the floods could have been limited if the design and operating standards of the dams had been more stringent. A Dam Safety Act was adopted by the Quebec National Assembly on May 30, 2000 following recommendations to retain safer structures. The Act demands regular reporting of operating procedures. Seismic activity was noted as being a topic that requires in-depth examination since Quebec's St. Lawrence Valley, particularly the Charlevoix region, is one of Canada's largest seismic zones. The other is on the west coast in British Columbia. Earthquakes in Quebec are less intense than the ones in British Columbia, but they have higher frequency content which exerts a quasi-resonance wave effect which impacts roads, bridges, buildings and hydroelectric generating facilities. Hydro-Quebec is a public utility which owns 563 retaining structures, of which 228 are ranked as large dams that measure more than 15 metres high, 400 metres long and with a reservoir capacity of more than 1 million cubic metres of water. Hydro-Quebec addresses hydrological, seismic, technological and human risks through a dam safety procedure that includes structured plans for choosing best alternatives through staged exercises. Hazard levels are minimized through the adoption of emergency, prevention and alleviation measures. The utility

  7. Impacts of Dams and Global Warming on Fish Biodiversity in the Indo-Burma Hotspot.

    Science.gov (United States)

    Kano, Yuichi; Dudgeon, David; Nam, So; Samejima, Hiromitsu; Watanabe, Katsutoshi; Grudpan, Chaiwut; Grudpan, Jarungjit; Magtoon, Wichan; Musikasinthorn, Prachya; Nguyen, Phuong Thanh; Praxaysonbath, Bounthob; Sato, Tomoyuki; Shibukawa, Koichi; Shimatani, Yukihiro; Suvarnaraksha, Apinun; Tanaka, Wataru; Thach, Phanara; Tran, Dac Dinh; Yamashita, Tomomi; Utsugi, Kenzo

    2016-01-01

    Both hydropower dams and global warming pose threats to freshwater fish diversity. While the extent of global warming may be reduced by a shift towards energy generation by large dams in order to reduce fossil-fuel use, such dams profoundly modify riverine habitats. Furthermore, the threats posed by dams and global warming will interact: for example, dams constrain range adjustments by fishes that might compensate for warming temperatures. Evaluation of their combined or synergistic effects is thus essential for adequate assessment of the consequences of planned water-resource developments. We made projections of the responses of 363 fish species within the Indo-Burma global biodiversity hotspot to the separate and joint impacts of dams and global warming. The hotspot encompasses the Lower Mekong Basin, which is the world's largest freshwater capture fishery. Projections for 81 dam-building scenarios revealed progressive impacts upon projected species richness, habitable area, and the proportion of threatened species as generating capacity increased. Projections from 126 global-warming scenarios included a rise in species richness, a reduction in habitable area, and an increase in the proportion of threatened species; however, there was substantial variation in the extent of these changes among warming projections. Projections from scenarios that combined the effects of dams and global warming were derived either by simply adding the two threats, or by combining them in a synergistic manner that took account of the likelihood that habitat shifts under global warming would be constrained by river fragmentation. Impacts on fish diversity under the synergistic projections were 10-20% higher than those attributable to additive scenarios, and were exacerbated as generating capacity increased-particularly if CO2 emissions remained high. The impacts of dams, especially those on river mainstreams, are likely to be greater, more predictable and more immediately pressing for

  8. Impacts of Dams and Global Warming on Fish Biodiversity in the Indo-Burma Hotspot.

    Directory of Open Access Journals (Sweden)

    Yuichi Kano

    Full Text Available Both hydropower dams and global warming pose threats to freshwater fish diversity. While the extent of global warming may be reduced by a shift towards energy generation by large dams in order to reduce fossil-fuel use, such dams profoundly modify riverine habitats. Furthermore, the threats posed by dams and global warming will interact: for example, dams constrain range adjustments by fishes that might compensate for warming temperatures. Evaluation of their combined or synergistic effects is thus essential for adequate assessment of the consequences of planned water-resource developments. We made projections of the responses of 363 fish species within the Indo-Burma global biodiversity hotspot to the separate and joint impacts of dams and global warming. The hotspot encompasses the Lower Mekong Basin, which is the world's largest freshwater capture fishery. Projections for 81 dam-building scenarios revealed progressive impacts upon projected species richness, habitable area, and the proportion of threatened species as generating capacity increased. Projections from 126 global-warming scenarios included a rise in species richness, a reduction in habitable area, and an increase in the proportion of threatened species; however, there was substantial variation in the extent of these changes among warming projections. Projections from scenarios that combined the effects of dams and global warming were derived either by simply adding the two threats, or by combining them in a synergistic manner that took account of the likelihood that habitat shifts under global warming would be constrained by river fragmentation. Impacts on fish diversity under the synergistic projections were 10-20% higher than those attributable to additive scenarios, and were exacerbated as generating capacity increased-particularly if CO2 emissions remained high. The impacts of dams, especially those on river mainstreams, are likely to be greater, more predictable and more

  9. Impacts of Dams and Global Warming on Fish Biodiversity in the Indo-Burma Hotspot

    Science.gov (United States)

    Nam, So; Samejima, Hiromitsu; Watanabe, Katsutoshi; Grudpan, Chaiwut; Grudpan, Jarungjit; Magtoon, Wichan; Musikasinthorn, Prachya; Nguyen, Phuong Thanh; Praxaysonbath, Bounthob; Sato, Tomoyuki; Shimatani, Yukihiro; Suvarnaraksha, Apinun; Tanaka, Wataru; Thach, Phanara; Tran, Dac Dinh; Yamashita, Tomomi

    2016-01-01

    Both hydropower dams and global warming pose threats to freshwater fish diversity. While the extent of global warming may be reduced by a shift towards energy generation by large dams in order to reduce fossil-fuel use, such dams profoundly modify riverine habitats. Furthermore, the threats posed by dams and global warming will interact: for example, dams constrain range adjustments by fishes that might compensate for warming temperatures. Evaluation of their combined or synergistic effects is thus essential for adequate assessment of the consequences of planned water-resource developments. We made projections of the responses of 363 fish species within the Indo-Burma global biodiversity hotspot to the separate and joint impacts of dams and global warming. The hotspot encompasses the Lower Mekong Basin, which is the world’s largest freshwater capture fishery. Projections for 81 dam-building scenarios revealed progressive impacts upon projected species richness, habitable area, and the proportion of threatened species as generating capacity increased. Projections from 126 global-warming scenarios included a rise in species richness, a reduction in habitable area, and an increase in the proportion of threatened species; however, there was substantial variation in the extent of these changes among warming projections. Projections from scenarios that combined the effects of dams and global warming were derived either by simply adding the two threats, or by combining them in a synergistic manner that took account of the likelihood that habitat shifts under global warming would be constrained by river fragmentation. Impacts on fish diversity under the synergistic projections were 10–20% higher than those attributable to additive scenarios, and were exacerbated as generating capacity increased—particularly if CO2 emissions remained high. The impacts of dams, especially those on river mainstreams, are likely to be greater, more predictable and more immediately

  10. How Physical Processes are Informing River Management Actions at Marble Bluff Dam, Truckee River, Nevada

    Science.gov (United States)

    Bountry, J.; Godaire, J.; Bradley, D. N.

    2017-12-01

    At the terminus of the Truckee River into Pyramid Lake (Nevada, USA), upstream river management actions have dramatically reshaped the river landscape, posing significant challenges for the management of endangered aquatic species and maintenance of existing infrastructure. Within the last 100 years, upstream water withdrawal for human uses has resulted in a rapid lowering of Pyramid Lake which initiated up to 90 ft of channel incision. In 1976 Marble Bluff Dam was constructed to halt the upstream progression of channel incision and protect upstream agricultural lands, tribal resources, and infrastructure. Since construction an additional 40 ft of lake lowering and subsequent channel lowering now poses a potential risk to the structural integrity of the dam. The dynamic downstream river combined with ongoing reservoir sedimentation pose challenges to fish passage facilities that enable migration of numerous endangered cui-ui and threatened Lahontan Cutthroat Trout (LCT) to upstream spawning areas each year. These facilities include a fish lock at the dam, a fish bypass channel which allows fish to avoid the shallow delta area during low lake levels, and a meandering channel constructed by the Nature Conservancy to connect the bypass channel to the receding Pyramid Lake. The reservoir formed by Marble Bluff Dam has completely filled with sediment which impacts fish passage facilities. The original operating manual for the dam recommends year-round flushing of sediment through radial gates, but this can no longer be accomplished. During critical fish migration periods in the spring operators must ensure fish entrance channels downstream of the dam are not buried with released sediment and fish are not trapped in a portion of the reservoir full of sediment that would risk sending them back over the dam. To help inform future reservoir sediment and infrastructure management strategies, we bracket a range of potential river responses to lake level lowering and floods

  11. Assessing Risks of Mine Tailing Dam Failures

    Science.gov (United States)

    Concha Larrauri, P.; Lall, U.

    2017-12-01

    The consequences of tailings dam failures can be catastrophic for communities and ecosystems in the vicinity of the dams. The failure of the Fundão tailings dam at the Samarco mine in 2015 killed 19 people with severe consequences for the environment. The financial and legal consequences of a tailings dam failure can also be significant for the mining companies. For the Fundão tailings dam, the company had to pay 6 billion dollars in fines and twenty-one executives were charged with qualified murder. There are tenths of thousands of active, inactive, and abandoned tailings dams in the world and there is a need to better understand the hazards posed by these structures to downstream populations and ecosystems. A challenge to assess the risks of tailings dams in a large scale is that many of them are not registered in publicly available databases and there is little information about their current physical state. Additionally, hazard classifications of tailings dams - common in many countries- tend to be subjective, include vague parameter definitions, and are not always updated over time. Here we present a simple methodology to assess and rank the exposure to tailings dams using ArcGIS that removes subjective interpretations. The method uses basic information such as current dam height, storage volume, topography, population, land use, and hydrological data. A hazard rating risk was developed to compare the potential extent of the damage across dams. This assessment provides a general overview of what in the vicinity of the tailings dams could be affected in case of a failure and a way to rank tailings dams that is directly linked to the exposure at any given time. One hundred tailings dams in Minas Gerais, Brazil were used for the test case. This ranking approach could inform the risk management strategy of the tailings dams within a company, and when disclosed, it could enable shareholders and the communities to make decisions on the risks they are taking.

  12. Research on Safety Factor of Dam Slope of High Embankment Dam under Seismic Condition

    Directory of Open Access Journals (Sweden)

    Li Bin

    2015-01-01

    Full Text Available With the constant development of construction technology of embankment dam, the constructed embankment dam becomes higher and higher, and the embankment dam with its height over 200m will always adopt the current design criteria of embankment dam only suitable for the construction of embankment dam lower than 200m in height. So the design criteria of high embankment dam shall be improved. We shall calculate the stability and safety factors of dam slope of high embankment dam under different dam height, slope ratio and different seismic intensity based on ratio of safety margin, and clarify the change rules of stability and safety factors of dam slope of high embankment dam with its height over 200m. We calculate the ratio of safety margin of traditional and reliable method by taking the stable, allowable and reliability index 4.2 of dam slope of high embankment dam with its height over 200m as the standard value, and conduct linear regression for both. As a result, the conditions, where 1.3 is considered as the stability and safety factors of dam slope of high embankment dam with its height over 200m under seismic condition and 4.2 as the allowable and reliability index, are under the same risk control level.

  13. Remotely installed steam generator nozzle dam system

    International Nuclear Information System (INIS)

    Mc Donald, F.X.; Weisel, E.M.; Schukei, G.E.

    1990-01-01

    This patent describes a method for remotely installing a dam unit in a nozzle or a nuclear steam generator head, the head including a manway. It comprises: mounting an articulated manipulator to an internal surface of the head, the manipulator having a free end which carries a jaw member; positioning the manipulator so that the jaw member is adjacent the manway and substantially on the manway axis; passing a first dam segment through the manway and attaching the jaw member to the first segment; positioning the manipulator so that the jaw member holds the first dam segment on one side of the manway axis; passing a second dam segment through the manway into engagement with the first dam segment to form a dam subassembly; translating the manipulator through the head until the dam subassembly is adjacent the nozzle; advancing the jaw member toward the nozzle until the cam subassembly is positioned substantially at the desired location of the dam unit with respect to the nozzle; and deploying the manipulator to install dam support structure between the dam subassembly and the steam generator, thereby forming an installed dam unit

  14. After Three Gorges Dam: What have we learned?

    Science.gov (United States)

    Natali, J.; Williams, P.; Wong, R.; Kondolf, G. M.

    2013-12-01

    China is at a critical point in its development path. By investing heavily in large-scale infrastructure, the rewards of economic growth weigh against long-term environmental and social costs. The construction of Three Gorges Dam, the world's largest hydroelectric project, began in 1994. Between 2002 and 2010, its 660 kilometer reservoir filled behind a 181 meter dam, displacing at least 1.4 million people and transforming Asia's longest river (the Yangtze) while generating nearly 100 billion kWh/yr of electricity -- 2.85% of China's current electric power usage. As the mega-project progenitor in a cascade of planned dams, the Three Gorges Dam emerges as a test case for how China will plan, execute and mitigate its development pathway and the transformation of its environment. Post-Project Assessments (PPA) provide a systematic, scientific method for improving the practice of environmental management - particularly as they apply to human intervention in river systems. In 2012, the Department of Landscape Architecture and Environmental Planning at University of California, Berkeley organized a symposium-based PPA for the Three Gorges Dam on the Yangtze River. Prior to this symposium, the twelve invited Chinese scientists, engineers and economists with recent research on Three Gorges Dam had not had the opportunity to present their evaluations together in an open, public forum. With a 50-year planning horizon, the symposium's five sessions centered on impacts on flows, geomorphology, geologic hazards, the environment and socioeconomic effects. Three Gorges' project goals focused on flood control, hydropower and improved navigation. According to expert research, major changes in sediment budget and flow regime from reservoir operation have significantly reduced sediment discharge into the downstream river and estuary, initiating a series of geomorphic changes with ecological and social impacts. While the dam reduces high flow stages from floods originating above the

  15. Trapped Ion Quantum Computation by Adiabatic Passage

    International Nuclear Information System (INIS)

    Feng Xuni; Wu Chunfeng; Lai, C. H.; Oh, C. H.

    2008-01-01

    We propose a new universal quantum computation scheme for trapped ions in thermal motion via the technique of adiabatic passage, which incorporates the advantages of both the adiabatic passage and the model of trapped ions in thermal motion. Our scheme is immune from the decoherence due to spontaneous emission from excited states as the system in our scheme evolves along a dark state. In our scheme the vibrational degrees of freedom are not required to be cooled to their ground states because they are only virtually excited. It is shown that the fidelity of the resultant gate operation is still high even when the magnitude of the effective Rabi frequency moderately deviates from the desired value.

  16. Complete tooth loss as status passage.

    Science.gov (United States)

    Gibson, Barry John; Sussex, Philip V; Fitzgerald, Ruth P; Thomson, William Murray

    2017-03-01

    The aim of this article is to add to the literature on the sociology of oral health and dentistry by presenting the relevance of status passage to the study of complete tooth loss. The article reports on an analysis of data taken from participants residing in the Nelson region of New Zealand. In total the data include interviews from 20 participants, all of whom had their remaining natural teeth removed before 1960. In total, 12 women and eight men were interviewed. All were from a European background with an age range of 71 to 101 years. Following a narrative approach, participants were interviewed on the nature of the social factors that resulted in complete tooth loss by starting with their family history and then focusing on the factors and events leading up to their total tooth loss. Data were analysed using the methods and techniques of grounded theory. This article provides an outline of the importance of scheduling, prescribing, social factors, 'compound awareness contexts' and reversibility to the status passage into complete tooth loss. We conclude by arguing that the theory of status passage may enable a detailed analysis of the 'time-space extensionality' of trajectories into complete tooth loss. © 2016 Foundation for the Sociology of Health & Illness.

  17. Biological dataset collected from bottle casts from the R/V LAURENCE M. GOULD and the R/V NATHANIEL B. PALMER in the Southern Drake Passage and Scotia Sea in support of National Science Foundation projects OPP 03-30443 and ANT 04-44134 from 15 February 2004 to 09 August 2006 (NODC Accession 0049902)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Ocean biology data were collected in Southern Drake Passage and Scotia Sea during two research cruises supported by NSF awards. These two cruises, namely LMG0402 and...

  18. Some thoughts on dam safety assessment: Small dams with not-so-small reservoirs

    International Nuclear Information System (INIS)

    Helwig, P.C.; Smith, W.L.

    1993-01-01

    There are about 300 dams in Newfoundland and Labrador of which only 9 are higher than 30 m. A significant number of these dams are less than 3 m in height yet retain appreciable volumes of water. Approaches to safety evaluations of these small dams vary considerably. Some authorities exclude such dams from mandatory inspections altogether, while others apply provisions that were clearly designed for more important structures. Neither approach is wholly satisfactory. Drawing on experience from inspection of over 100 mainly small dams, the issue is discussed and approaches to improve methods for dams safety evaluation of very small dams are suggested. Selection of design flood criteria, design guidelines, and reservoir flood standards are discussed. Newfoundland Power's dam safety assessment procedures for such dams are described. 8 refs., 2 figs., 3 tabs

  19. Study of Dam-break Due to Overtopping of Four Small Dams in the Czech Republic

    Directory of Open Access Journals (Sweden)

    Zakaraya Alhasan

    2015-01-01

    Full Text Available Dam-break due to overtopping is one of the most common types of embankment dam failures. During the floods in August 2002 in the Czech Republic, several small dams collapsed due to overtopping. In this paper, an analysis of the dam break process at the Luh, Velký Bělčický, Melín, and Metelský dams breached during the 2002 flood is presented. Comprehensive identification and analysis of the dam shape, properties of dam material and failure scenarios were carried out after the flood event to assemble data for the calibration of a numerical dam break model. A simple one-dimensional mathematical model was proposed for use in dam breach simulation, and a computer code was compiled. The model was calibrated using the field data mentioned above. Comparison of the erodibility parameters gained from the model showed reasonable agreement with the results of other authors.

  20. Geomorphic and habitat response to a large-dam removal in a Mediterranean river

    Science.gov (United States)

    Harrison, L.; East, A. E.; Smith, D. P.; Bond, R.; Logan, J. B.; Nicol, C.; Williams, T.; Boughton, D. A.; Chow, K.

    2017-12-01

    The presence of large dams has fundamentally altered physical and biological processes in riverine ecosystems, and dam removal is becoming more common as a river restoration strategy. We used a before-after-control-impact study design to investigate the geomorphic and habitat response to removal of 32-m-high San Clemente Dam on the Carmel River, CA. The project represents the first major dam removal in a Mediterranean river and is also unique among large dam removals in that most reservoir sediment was sequestered in place. We found that in the first year post-removal, a sediment pulse migrated 3.5 km downstream, filling pools and the interstitial pore spaces of gravels with sand. These sedimentary and topographic changes initially reduced the overall quality of steelhead (O. mykiss) spawning and rearing habitat in impacted reaches. Over the second winter after dam removal, a sequence of high flows flushed large volumes of sand from pools and mobilized the river bed throughout much of the active channel. The floods substantially altered fluvial evolution in the upper part of the reservoir, promoting new avulsion and the subsequent delivery of gravel and large wood to below dam reaches. These geomorphic processes increased the availability of spawning-sized gravel and enhanced channel complexity in reaches within several km of the former dam, which should improve habitat for multiple life stages of steelhead. Results indicate that when most reservoir sediment remains impounded, high flows become more important drivers of geomorphic and habitat change than dam removal alone. In such cases, the rates at which biophysical processes are reestablished will depend largely on post-dam removal flow sequencing and the upstream supply of sediment and large wood.

  1. A dam in the heart of the forest

    International Nuclear Information System (INIS)

    Arnaud, B.

    2006-01-01

    The Nam Theun 2 dam in Laos, is presented as an exemplary project for two reasons. This giant constructive work is supposed to save the country from poverty and the project is carried out with an extreme care of the environment and of the habitants: relocation of populations in the vicinity of the dam, preservation of the animal species, protection of the 4000 km 2 upstream area. The construction work is controlled by the Nam Theun Power Company (NTPC) consortium which gathers EDF (France, 35%), EGCO (Thailand, 25%), Laos Electricity (25%) and Italian-Thai Development Company (15%). 95% of the power generated will be exported to Thailand, and the remaining 5% will supply southern Laos. (J.S.)

  2. Fish Passage Center; Columbia Basin Fish and Wildlife Authority, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    DeHart, Michele; Berggren, Thomas J.; Filardo, Margaret (Columbia Basin Fish and Wildlife Authority, Fish Passage Center, Portland, OR)

    2003-09-01

    The runoff volumes in 2002 were near average for the January to July period above Lower Granite Dam (80%) and The Dalles Dam (97%). The year 2002 hydrosystem operations and runoff conditions resulted in flows that were less than the seasonal Biological Opinion (Opinion) flow objectives at Lower Granite Dam for both the spring and summer period. The seasonal flow objectives for Priest Rapids and McNary dams were exceeded for the spring period, but at McNary Dam summer flow objectives were not met. While seasonal flow objectives were exceeded for the spring at McNary Dam, the 2002 season illustrated that Biological Opinion management to seasonal flow targets can result in conditions where a major portion of the juvenile fish migration migrates in conditions that are less than the flow objectives. The delay in runoff due to cool weather conditions and the inability of reservoirs to augment flows by drafting lower than the flood control elevations, resulted in flows less than the Opinion objectives until May 22, 2002. By this time approximately 73% of the yearling chinook and 56% of steelhead had already passed the project. For the most part, spill in 2002 was managed below the gas waiver limits for total dissolved gas levels and the NMFS action criteria for dissolved gas signs were not exceeded. The exception was at Lower Monumental Dam where no Biological Opinion spill occurred due to the need to conduct repairs in the stilling basin. Survival estimates obtained for PIT tagged juveniles were similar in range to those observed prior to 2001. A multi-year analysis of juvenile survival and the factors that affect it was conducted in 2002. A water transit time and flow relation was demonstrated for spring migrating chinook and steelhead of Snake River and Mid Columbia River origin. Returning numbers of adults observed at Bonneville Dam declined for spring chinook, steelhead and coho, while summer and fall chinook numbers increased. However, all numbers were far greater

  3. Seismic safety evaluation of Hydro-Quebec's dams

    International Nuclear Information System (INIS)

    Dascal, O.

    1990-01-01

    Hydro-Quebec owns and operates about 500 dams and appurtenant structures in the Quebec territory. The portion of the St. Lawrence valley lying between Quebec City and the Saguenay River is historically the most seismically active area in eastern North America. Hydro-Quebec has undertaken a comprehensive research and development program aimed at establishing a realistic seismic safety evaluation procedure for its dams. Further incentives for the program are recent developments in the fields of seismology, dynamic stability analysis, liquefaction probability evaluation, etc., as well as the fairly advanced weathering of the older structures. In November of 1988, an earthquake with magnitude 5.7 on the Richter scale occurred close to the southern border of the Laurentides Provincial Park in the province of Quebec. While no significant damage was done to Hydro-Quebec hydroelectric projects, at least six highway embankment failures and several large natural slope landslides were reported. Seismic instrumentation readings taken during the earthquake at a number of Hydro-Quebec dams equipped with such instruments are presented. Details are provided of Hydro-Quebec's seismic safety evaluation program, including inspection procedures, instrumentation, dam behaviour evaluation, ground motion parameters, and analytic methods of evaluation. 6 refs., 6 figs., 2 tabs

  4. Passage of fish larvae and eggs through the Funil, Itutinga and Camargos Reservoirs on the upper Rio Grande (Minas Gerais, Brazil

    Directory of Open Access Journals (Sweden)

    Fábio Mineo Suzuki

    Full Text Available The objective of this study was to evaluate the passage of fish eggs and larvae through the Funil, Itutinga and Camargos Reservoirs, located in the upper Rio Grande basin, Minas Gerais, Brazil. Samples were taken downstream and upstream of the dams using a conical ichthyoplankton net and were collected every two weeks, twice per sampling day, between November 2008 and March 2009. Although eggs and larvae were abundant immediately upstream of the reservoirs, no ichthyoplankton were captured immediately downstream of the dams, possibly indicating that eggs and larvae do not pass through the reservoirs. The arrival of ichthyoplankton in the reservoirs without its effective passage downstream makes the survival of these eggs and larvae unlikely. Furthermore, this lack of downstream movement may compromise the recruitment of species to downstream stretches, especially in the case of the Funil Reservoir (because of the presence of a fish pass in this dam. We emphasize that the fish lift operation at the Funil Dam must be carefully assessed, considering not only its efficiency but also its short- and long-term effects on the recruitment of migratory fish species from the river.

  5. Methods for determination of passage rates of, fibre in tropical ...

    African Journals Online (AJOL)

    Passage rates were estimated in vivo using five rumen fistulated non-pregnant dairy heifers. Rumen evacuation technique (RET), and chromium mordanted fibre (CR-MF) method were used to estimate passage rates in 5 x 5 Latin Square experiment. Passage rates measured using CR-MF and RET showed high variabiltiy ...

  6. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems.

  7. Seismic Analysis of Gravity Dams.

    Science.gov (United States)

    method of analysis with the results produced by the well-known program EADHI. A new simplified method of analysis was developed using the finite element method of analysis to determine the dam’s inertial response along with Chopra’s simplified procedure for estimating the hydrodynamic loading. This new approach was implemented in a user-friendly computer program. The program was tested against a wide variety of problems and found to produce acceptable results. A sample run using this

  8. Migrations and swimming capabilities of endangered pallid sturgeon (Scaphirhynchus albus) to guide passage designs in the fragmented Yellowstone River

    Science.gov (United States)

    Braaten, P. J.; Elliott, Caroline M.; Rhoten, Jason C.; Fuller, D. B.; McElroy, Brandon J.

    2015-01-01

    Fragmentation of the Yellowstone River is hypothesized to preclude recruitment of endangered Scaphirhynchus albus (pallid sturgeon) by impeding upstream spawning migrations and access to upstream spawning areas, thereby limiting the length of free-flowing river required for survival of early life stages. Building on this hypothesis, the reach of the Yellowstone River affected by Intake Diversion Dam (IDD) is targeted for modification. Structures including a rock ramp and by-pass channel have been proposed as restoration alternatives to facilitate passage. Limited information on migrations and swimming capabilities of pallid sturgeon is available to guide engineering design specifications for the proposed structures. Migration behavior, pathways (channel routes used during migrations), and swimming capabilities of free-ranging wild adult pallid sturgeon were examined using radiotelemetry, and complemented with hydraulic data obtained along the migration pathways. Migrations of 12–26% of the telemetered pallid sturgeon population persisted to IDD, but upstream passage over the dam was not detected. Observed migration pathways occurred primarily through main channel habitats; however, migrations through side channels up to 3.9 km in length were documented. The majority of pallid sturgeon used depths of 2.2–3.4 m and mean water velocities of 0.89–1.83 m/s while migrating. Results provide inferences on depths, velocities, and habitat heterogeneity of reaches successfully negotiated by pallid sturgeon that may be used to guide designs for structures facilitating passage at IDD. Passage will provide connectivity to potential upstream spawning areas on the Yellowstone River, thereby increasing the likelihood of recruitment for this endangered species.

  9. Mitigating Dam Impacts Using Environmental Flow Releases

    Science.gov (United States)

    Richter, B. D.

    2017-12-01

    One of the most ecologically disruptive impacts of dams is their alteration of natural river flow variability. Opportunities exist for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. This presentation will highlight a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the suggested strategies for dam re-operation are predicated on changes in the end-use of the water, such as reductions in urban or agricultural water use during droughts, a systemic perspective of entire water management systems will be required to attain the fullest possible

  10. Survey of Potential Hanford Site Contaminants in the Upper Sediment for the Reservoirs at McNary, John Day, The Dalles, and Bonneville Dams, 2003

    Energy Technology Data Exchange (ETDEWEB)

    Patton, Gregory W.; Priddy, M; Yokel, Jerel W.; Delistraty, Damon A.; Stoops, Thomas M.

    2005-02-01

    This report presents the results from a multi-agency cooperative environmental surveillance study. of the study looked at sediment from the pools upstream from dams on the Columbia River that are downstream from Hanford Site operations. The radiological and chemical conditions existing in the upper-level sediment found in the pools upstream from McNary Dam, John Day Dam, The Dalles Lock and Dam, and Bonneville Dam were evaluated. This study also evaluated beach sediment where available. Water samples were collected at McNary Dam to further evaluate potential Hanford contaminants in the lower Columbia River. Samples were analyzed for radionuclides, chemicals, and physical parameters. Results from this study were compared to background values from sediment and water samples collect from the pool upstream of Priest Rapids Dam (upstream of the Hanford Site) by the Hanford Site Surface Environmental Surveillance Project.

  11. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 1997 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Nelson, William R.

    1999-04-01

    This project monitored the daily passage of chinook salmon Oncorhynchus tshawytscha and steelhead trout O. mykiss smolts during the 1997 spring out-migration at migrant traps on the Snake River and Salmon River. All hatchery chinook salmon released above Lower Granite Dam were marked with a fin clip in 1997. Total annual hatchery chinook salmon catch at the Snake River trap was 49% of the 1996 number but only 6% of the 1995 catch. The wild chinook catch was 77% of the 1996 but was only 13% of 1995. Hatchery steelhead trout catch was 18% of 1996 numbers but only 7% of the 1995 numbers. Wild steelhead trout catch was 22% of 1996 but only 11% of the 1995 numbers. The Snake River trap collected eight age-0 chinook salmon and one sockeye/kokanee salmon O. nerka. Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with high flows. Trap operations were terminated for the season due to high flows and trap damage on May 8 and were out of operation for 23 d due to high flow and debris. Hatchery chinook salmon catch at the Salmon River trap was 37% and wild chinook salmon catch was 60% of 1996 numbers but only 5% and 11% of 1995 catch, respectively. The 1997 hatchery steelhead trout collection was 13% of the 1996 catch and 32% of the 1995 numbers. Wild steelhead trout collection in 1997 was 21% of the 1996 catch and 13% of the 1995 numbers. Trap operations were terminated for the season due to high flows and trap damage on May 7 and were out of operation for 19 d due to high flow and debris.

  12. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 1999 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Brimmer, Arnold F.; Putnam, Scott A.

    2001-06-01

    This project monitored the daily passage of chinook salmon Oncorhynchus tshawytscha, steelhead trout O. mykiss, and sockeye salmon smolts O. nerka during the 1999 spring out-migration at migrant traps on the Snake River and Salmon River. All hatchery chinook salmon released above Lower Granite Dam were marked with a fin clip in 1999. Total annual hatchery chinook salmon catch at the Snake River trap was 440% of the 1998 number. The wild chinook catch was 603% of the previous year's catch. Hatchery steelhead trout catch was 93% of 1998 numbers. Wild steelhead trout catch was 68% of 1998 numbers. The Snake River trap collected 62 age-0 chinook salmon. During 1998 the Snake River trap captured 173 hatchery and 37 wild/natural sockeye salmon and 130 hatchery coho salmon O. kisutch. Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with high flows. Trap operations began on March 14 and were terminated for the season due to high flows on May 25. The trap was out of operation for 18 d during the season due to high flow and debris. Hatchery chinook salmon catch at the Salmon River trap was 214%, and wild chinook salmon catch was 384% of 1998 numbers. The hatchery steelhead trout collection in 1999 was 210% of the 1998 numbers. Wild steelhead trout collection in 1999 was 203% of the 1998 catch. Trap operations began on March 14 and were terminated for the season due to high flows on May 21. The trap was out of operation for 17 d during the season due to high flow and debris.

  13. The underwater installation of a drained geomembrane system on Lost Creek Dam

    International Nuclear Information System (INIS)

    Onken, S.; Harlan, R.C.; Wilkes, J.; Vaschetti, G.

    1998-01-01

    Lost Creek Dam was constructed in California around 1923. It is a 122 foot high concrete arch dam with a crest elevation of 3,287 feet and a crest length of 490 feet. Over the years, the dam and the condition of the concrete face have deteriorated. The concrete is porous and seeps water along the entire downstream face. In winter, the seeping water freezes, penetrates the concrete and causes expansion and spalling of the concrete surface. In some places, the concrete has very low strength to a depth of a foot or more, rendering the dam only marginally safe. Seven mitigative measures were identified as possible solutions to the problem. It was determined that the seepage of the water through the concrete dam could be stopped with the installation of a geomembrane to the upstream face. This paper describes the unique underwater installation of a drained geomembrane system on the concrete face of the dam. This was the first ever installation of a drained geomembrane system on an entire dam using divers. Monitoring will determine the success of the project, and whether the seepage of the water through the porous concrete had been reduced sufficiently to stop the deterioration of the concrete on the downstream face. 2 refs., 12 figs

  14. Deformation Monitoring of Geomechanical Model Test and Its Application in Overall Stability Analysis of a High Arch Dam

    Directory of Open Access Journals (Sweden)

    Baoquan Yang

    2015-01-01

    Full Text Available Geomechanical model testing is an important method for studying the overall stability of high arch dams. The main task of a geomechanical model test is deformation monitoring. Currently, many types of deformation instruments are used for deformation monitoring of dam models, which provide valuable information on the deformation characteristics of the prototype dams. However, further investigation is required for assessing the overall stability of high arch dams through analyzing deformation monitoring data. First, a relationship for assessing the stability of dams is established based on the comprehensive model test method. Second, a stability evaluation system is presented based on the deformation monitoring data, together with the relationships between the deformation and overloading coefficient. Finally, the comprehensive model test method is applied to study the overall stability of the Jinping-I high arch dam. A three-dimensional destructive test of the geomechanical model dam is conducted under reinforced foundation conditions. The deformation characteristics and failure mechanisms of the dam abutments and foundation were investigated. The test results indicate that the stability safety factors of the dam abutments and foundation range from 5.2 to 6.0. These research results provide an important scientific insight into the design, construction, and operation stages of this project.

  15. Automated data acquisition for dam monitoring

    International Nuclear Information System (INIS)

    Koopmans, R.; Jakubick, A.T.

    1990-01-01

    Automated data acquisition for dam monitoring is crucial to emergency response, allows frequent readings without increased labour and cost, allows monitoring of instrument response to changing environmental and physical influences, enables direct computer acquisition of data, and has numerous other advantages. The experience of Ontario Hydro, British Columbia Hydro, and other utilities with automated data acquisition systems is described. Details are provided of remote monitoring systems, instrumentation, data loggers, tape cassette backup, power sources, data transmission equipment, modems and telephone networks, computers and peripherals, and system performance. The utility's plans for future expansion of the systems are described. Utility experience with the automated systems is also described for Clarence Dam, Bath County Pumped Storage Station, Scott Dam, and Vermillion Dam in the U.S., Ajaure Dam in Sweden, and ENEL Dam in the Valtellina area of Italy. 17 refs., 2 figs

  16. Upstream passage, spawning, and stock identification of fall chinook in the Snake River, 1992 and 1993. Final report

    International Nuclear Information System (INIS)

    Blankenship, H.L.; Mendel, G.W.

    1997-05-01

    This final report of the 3-year study summarizes activities and results for 1993. Study objectives were to: (1) determine the source of losses (or accounting errors) for adult chinook salmon between Ice Harbor Dam (IHR) and Lower Granite Dam (LGR), and upstream of LGR in the Snake River; (2) identify spawning locations upstream of LGR for calibration of aerial redd surveys, redd habitat mapping, carcass recovery for genetic stock profile analysis, and correction of estimated adult/redd ratios; and (3) estimate passage and migration times at Snake River. 200 fall chinook salmon were radio tagged and tracked with aerial, fixed-site, and ground mobile tracking. Fish were released upstream of IHR at Charbonneau Park (CHAR). 190 of the fish were tracked or relocated away from CHAR. 59 fish descended to below IHR without crossing Lower Monumental Dam (LMO). Another 128 salmon passed upstream of LMO without falling back at IHR. Only 80 salmon passed Little Goose Dam (LGO) without falling back at a downstream dam; 66 of these fish passed LGR. Many fish that fell back reascended the dams. A total of 72 salmon released at CHAR passed upstream of LGR, including fish that had fallen back and reascended a dam. Over 80 percent of the salmon that entered Lyons Ferry Hatchery each year had reached LGO before descending to the hatchery. Extensive wandering was documented between LMO and upstream of LGR before salmon entered Lyons Ferry Hatchery or the Tucannon River. In 1993, 41 salmon were found to be of hatchery origin when recovered. These fish entered Lyons Ferry Hatchery with similar movements to unmarked salmon. Each year a few salmon have remained near the hatchery without entering, which suggests the hatchery may have inadequate attraction flows. Fall chinook passed lower Snake River dams in 2-5 days each on average. Median travel times through LMO and LGO were 1.0-1.3 days each, which was slower than for spring chinook or steelhead in 1993. 5 refs., 21 figs., 20 tabs

  17. Measurement of Dam Deformations: Case Study of Obruk Dam (Turkey)

    Science.gov (United States)

    Gulal, V. Engin; Alkan, R. Metin; Alkan, M. Nurullah; İlci, Veli; Ozulu, I. Murat; Tombus, F. Engin; Kose, Zafer; Aladogan, Kayhan; Sahin, Murat; Yavasoglu, Hakan; Oku, Guldane

    2016-04-01

    In the literature, there is information regarding the first deformation and displacement measurements in dams that were conducted in 1920s Switzerland. Todays, deformation measurements in the dams have gained very different functions with improvements in both measurement equipment and evaluation of measurements. Deformation measurements and analysis are among the main topics studied by scientists who take interest in the engineering measurement sciences. The Working group of Deformation Measurements and Analysis, which was established under the International Federation of Surveyors (FIG), carries out its studies and activities with regard to this subject. At the end of the 1970s, the subject of the determination of fixed points in the deformation monitoring network was one of the main subjects extensively studied. Many theories arose from this inquiry, as different institutes came to differing conclusions. In 1978, a special commission with representatives of universities has been established within the FIG 6.1 working group; this commission worked on the issue of determining a general approach to geometric deformation analysis. The results gleaned from the commission were discussed at symposiums organized by the FIG. In accordance with these studies, scientists interested in the subject have begun to work on models that investigate cause and effect relations between the effects that cause deformation and deformation. As of the scientist who interest with the issue focused on different deformation methods, another special commission was established within the FIG engineering measurements commission in order to classify deformation models and study terminology. After studying this material for a long time, the official commission report was published in 2001. In this prepared report, studies have been carried out by considering the FIG Engineering Surveying Commission's report entitled, 'MODELS AND TERMINOLOGY FOR THE ANALYSIS OF GEODETIC MONITORING OBSERVATIONS

  18. Fish Passage Assessment of an Advanced Hydropower Turbine and Conventional Turbine Using Blade-Strike Modeling

    Directory of Open Access Journals (Sweden)

    Zhiqun Deng

    2011-01-01

    Full Text Available Hydropower is the largest renewable energy source in the world. However, in the Columbia and Snake River basins, several species of Pacific salmon and steelhead have been listed for protection under the Endangered Species Act due to significant declines of fish population. Dam operators and design engineers are thus faced with the task of making hydroelectric facilities more fish friendly through changes in hydro-turbine design and operation. Public Utility District No. 2 of Grant County, Washington, applied for relicensing from the U.S. Federal Energy Regulatory Commission to replace the 10 turbines at Wanapum Dam with advanced hydropower turbines that were designed to increase power generation and improve fish passage conditions. We applied both deterministic and stochastic blade-strike models to compare fish passage performance of the newly installed advanced turbine to an existing turbine. Modeled probabilities were compared to the results of a large-scale live-fish survival study and a Sensor Fish study under the same operational parameters. Overall, injury rates predicted by the deterministic model were higher than experimental rates of injury, while those predicted by the stochastic model were in close agreement with experimental results. Fish orientation at the time of entry into the plane of the leading edges of the turbine runner blades was an important factor contributing to uncertainty in modeled results. The advanced design turbine had slightly higher modeled injury rates than the existing turbine design; however, no statistical evidence suggested significant differences in blade-strike injuries between the two turbines, thus the hypothesis that direct fish survival rate through the advanced hydropower turbine is equal to or higher than that for fish passing through the conventional turbine could not be rejected.

  19. Bubble Universe Dynamics After Free Passage

    Energy Technology Data Exchange (ETDEWEB)

    Ahlqvist, Pontus [Department of Physics, Columbia University, New York, New York 10027 (United States); Eckerle, Kate [Department of Applied Mathematics, Columbia University, New York, New York 10027 (United States); Greene, Brian [Department of Physics, Columbia University, New York, New York 10027 (United States); Department of Applied Mathematics, Columbia University, New York, New York 10027 (United States)

    2015-03-06

    We consider bubble collisions in single scalar field theories with multiple vacua. Recent work has argued that at sufficiently high impact velocities, collisions between such bubble vacua are governed by ‘free passage’ dynamics in which field interactions can be ignored during the collision, providing a systematic process for populating local minima without quantum nucleation. We focus on the time period that follows the bubble collision and provide evidence that, for certain potentials, interactions can drive significant deviations from the free-passage bubble profile, thwarting the production of bubbles with different field values.

  20. Three Dimensional Seepage Analyses in Mollasadra Dam after Its ...

    African Journals Online (AJOL)

    Mollasadra dam is an earth fill dam with a clayey core and a height of 72 m from river bed, constructed on Kor River. pore water pressure in the dam was investigated following its construction and first and second impoundments. The dam was modeled by a finite element mesh. After the first and second dam impoundments, ...

  1. Global Reservoir and Dam Database, Version 1 (GRanDv1): Dams, Revision 01

    Data.gov (United States)

    National Aeronautics and Space Administration — The Global Reservoir and Dam Database, Version 1 (Revision 01) contains 6,862 records of reservoirs and their associated dams with a cumulative storage capacity of...

  2. Global Reservoir and Dam Database, Version 1 (GRanDv1): Dams, Revision 01

    Data.gov (United States)

    National Aeronautics and Space Administration — The Global Reservoir and Dam Database, Version 1, Revision 01 (v1.01) contains 6,862 records of reservoirs and their associated dams with a cumulative storage...

  3. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  4. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Putnam, Scott A. [Idaho Department of Fish and Game

    2009-02-18

    This project monitored the daily passage of Chinook salmon Oncorhynchus tshawytscha, steelhead trout O. mykiss, and sockeye salmon O. nerka smolts during the 2005 spring out-migration at migrant traps on the Snake River and Salmon River. In 2005 fish management agencies released significant numbers of hatchery Chinook salmon and steelhead trout above Lower Granite Dam that were not marked with a fin clip or coded-wire tag. Generally, the age-1 and older fish were distinguishable from wild fish by the occurrence of fin erosion. Age-0 Chinook salmon are more difficult to distinguish between wild and non-adclipped hatchery fish and therefore classified as unknown rearing. The total annual hatchery spring/summer Chinook salmon catch at the Snake River trap was 0.34 times greater in 2005 than in 2004. The wild spring/summer Chinook catch was 0.34 times less than the previous year. Hatchery steelhead trout catch was 0.67 times less than in 2004. Wild steelhead trout catch was 0.72 times less than the previous year. The Snake River trap collected 1,152 age-0 Chinook salmon of unknown rearing. During 2005, the Snake River trap captured 219 hatchery and 44 wild/natural sockeye salmon and 110 coho salmon O. kisutch of unknown rearing. Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with flow. Trap operations began on March 6 and were terminated on June 3. The trap was out of operation for a total of one day due to heavy debris. FPC requested that the trap be restarted on June 15 through June 22 to collect and PIT tag age-0 Chinook salmon. Hatchery Chinook salmon catch at the Salmon River trap was 1.06 times greater and wild Chinook salmon catch was 1.26 times greater than in 2004. The hatchery steelhead trout collection in 2005 was 1.41 times greater and wild steelhead trout collection was 1.27 times greater than the previous year. Trap operations

  5. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Putnam, Scott A. [Idaho Department of Fish and Game

    2009-02-18

    This project monitored the daily passage of Chinook salmon Oncorhynchus tshawytscha, steelhead trout O. mykiss, and sockeye salmon O. nerka smolts during the 2004 spring out-migration at migrant traps on the Snake River and Salmon River. In 2004 fish management agencies released significant numbers of hatchery Chinook salmon and steelhead trout above Lower Granite Dam that were not marked with a fin clip or coded-wire tag. Generally, these fish were distinguishable from wild fish by the occurrence of fin erosion. Total annual hatchery Chinook salmon catch at the Snake River trap was 1.1 times greater in 2004 than in 2003. The wild Chinook catch was 1.1 times greater than the previous year. Hatchery steelhead trout catch was 1.2 times greater than in 2003. Wild steelhead trout catch was 1.6 times greater than the previous year. The Snake River trap collected 978 age-0 Chinook salmon of unknown rearing. During 2004, the Snake River trap captured 23 hatchery and 18 wild/natural sockeye salmon and 60 coho salmon O. kisutch of unknown rearing. Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with flow. Trap operations began on March 7 and were terminated on June 4. The trap was out of operation for a total of zero days due to mechanical failure or debris. Hatchery Chinook salmon catch at the Salmon River trap was 10.8% less and wild Chinook salmon catch was 19.0% less than in 2003. The hatchery steelhead trout collection in 2004 was 20.0% less and wild steelhead trout collection was 22.3% less than the previous year. Trap operations began on March 7 and were terminated on May 28 due to high flows. There were two days when the trap was taken out of service because wild Chinook catch was very low, hatchery Chinook catch was very high, and the weekly quota of PIT tagged hatchery Chinook had been met. Travel time (d) and migration rate (km

  6. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Putnam, Scott A. [Idaho Department of Fish and Game

    2009-02-18

    This project monitored the daily passage of Chinook salmon Oncorhynchus tshawytscha, steelhead trout O. mykiss, and sockeye salmon smolts O. nerka during the 2002 spring out-migration at migrant traps on the Snake River and Salmon River. In 2002 fish management agencies released significant numbers of hatchery Chinook salmon and steelhead trout above Lower Granite Dam that were not marked with a fin clip or coded-wire tag. Generally, these fish were distinguishable from wild fish by the occurrence of fin erosion. Total annual hatchery Chinook salmon catch at the Snake River trap was 11.4 times greater in 2002 than in 2001. The wild Chinook catch was 15.5 times greater than the previous year. Hatchery steelhead trout catch was 2.9 times greater than in 2001. Wild steelhead trout catch was 2.8 times greater than the previous year. The Snake River trap collected 3,996 age-0 Chinook salmon of unknown rearing. During 2002, the Snake River trap captured 69 hatchery and 235 wild/natural sockeye salmon and 114 hatchery coho salmon O. kisutch. Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with flow. The significant increase in catch in 2002 was due to a 3.1 fold increase in hatchery Chinook production and a more normal spring runoff. Trap operations began on March 10 and were terminated on June 7. The trap was out of operation for a total of four days due to mechanical failure or debris. Hatchery Chinook salmon catch at the Salmon River trap was 4.2 times greater and wild Chinook salmon catch was 2.4 times greater than in 2001. The hatchery steelhead trout collection in 2002 was 81% of the 2001 numbers. Wild steelhead trout collection in 2002 was 81% of the previous year's catch. Trap operations began on March 10 and were terminated on May 29 due to high flows. The trap was out of operation for four days due to high flow or debris. The

  7. Smolt Monitoring at the Head of Lower Granite Reservoir and Lower Granite Dam, 2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Buettner, Edwin W.; Putnam, Scott A. [Idaho Department of Fish and Game

    2009-02-18

    This project monitored the daily passage of Chinook salmon Oncorhynchus tshawytscha, steelhead trout O. mykiss, and sockeye salmon O. nerka smolts during the 2003 spring out-migration at migrant traps on the Snake River and Salmon River. In 2003 fish management agencies released significant numbers of hatchery Chinook salmon and steelhead trout above Lower Granite Dam that were not marked with a fin clip or coded-wire tag. Generally, these fish were distinguishable from wild fish by the occurrence of fin erosion. Total annual hatchery Chinook salmon catch at the Snake River trap was 2.1 times less in 2003 than in 2002. The wild Chinook catch was 1.1 times less than the previous year. Hatchery steelhead trout catch was 1.7 times less than in 2002. Wild steelhead trout catch was 2.1 times less than the previous year. The Snake River trap collected 579 age-0 Chinook salmon of unknown rearing. During 2003, the Snake River trap captured five hatchery and 13 wild/natural sockeye salmon and 36 coho salmon O. kisutch of unknown rearing. Differences in trap catch between years are due to fluctuations not only in smolt production, but also differences in trap efficiency and duration of trap operation associated with flow. The significant differences in catch between 2003 and the previous year were due mainly to low flows during much of the trapping season and then very high flows at the end of the season, which terminated the trapping season 12 days earlier than in 2002. Trap operations began on March 9 and were terminated on May 27. The trap was out of operation for a total of zero days due to mechanical failure or debris. Hatchery Chinook salmon catch at the Salmon River trap was 16.8% less and wild Chinook salmon catch was 1.7 times greater than in 2002. The hatchery steelhead trout collection in 2003 was 5.6% less than in 2002. Wild steelhead trout collection was 19.2% less than the previous year. Trap operations began on March 9 and were terminated on May 24 due to high

  8. Assessment of check-dam groundwater recharge with water-balance calculations

    Science.gov (United States)

    Djuma, Hakan; Bruggeman, Adriana; Camera, Corrado; Eliades, Marinos

    2017-04-01

    check-dam was estimated to be 1 million m3. Upper and lower limits of prediction intervals were computed to assess the uncertainties of the results. The model was rerun with these values and resulted in recharge values of 0.4 m3 as lower and 38 million m3 as upper limit. The sediment survey in the check-dam reservoir area showed that the reservoir area was filled with 2,000 to 3,000 tons of sediment after one rainfall season. This amount of sediment corresponds to 0.2 to 2 t h-1 y-1 sediment yield at the watershed level and reduces the check-dam storage capacity by approximately 10%. Results indicate that check-dams are valuable structures for increasing groundwater resources, but special attention should be given to soil erosion occurring in the upstream area and the resulting sediment built-up in the check-dam reservoir area. This study has received funding from the EU FP7 RECARE Project (GA 603498)

  9. Dam safety management in Victoria (Australia)

    International Nuclear Information System (INIS)

    Adem, J.

    1996-01-01

    The Victoria state government's decision to make dam owners accountable for safety and upkeep of their dams was reported. To give effect to this decision a series of guidelines have been developed which outline the required activities and skills to ensure that dams are properly managed within a framework of 'light-handed' regulation. The guidelines are also intended to ensure that dam management becomes an integral part of the business decision making process, not just a set of prescribed technical procedures. Details of the direction being taken and the proposed controls to ensure compliance with national and international standards were described. 4 refs., 2 figs

  10. Risk assessment of a hydraulic fill dam

    International Nuclear Information System (INIS)

    Cattanach, J. D.; Stewart, R. A.

    1996-01-01

    The concerns expressed about the safety of the 85 year old 29 m hydraulic Coquitlam Dam in the Greater Vancouver area were described. Because of these concerns, and despite the fact that the dam meets the Incremental Hazard Classification criteria, B.C. Hydro carried out an evaluation with risk assessment. The processes employed and the results of the evaluation were described. It was found that although the dam was safe enough, in light of experiences with other dams, further evaluations will have to be carried out to verify these results. 2 refs., 6 figs

  11. A ravenous river reclaims its true course: the tale of Marmot Dam''s demise

    Science.gov (United States)

    Noreen Parks; Gordon Grant

    2009-01-01

    Removing dams that are outdated, unsafe, or pose significant economic or environmental costs has emerged in the last 10 years as a major river restoration strategy. The removal of the 45-foot-high Marmot Dam on the Sandy River in 2007 resulted in the biggest sediment release accompanying any dam removal to date. It also provided an unprecedented opportunity...

  12. Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.

    Energy Technology Data Exchange (ETDEWEB)

    Ashley, Paul

    1992-06-01

    The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.

  13. Condensation phenomena in a turbine blade passage

    International Nuclear Information System (INIS)

    Skillings, S.A.

    1989-02-01

    The mechanisms associated with the formation and growth of water droplets in the large low-pressure (LP) turbines used for electrical power generation are poorly understood and recent measurements have indicated that an unusually high loss is associated with the initial nucleation of these droplets. In order to gain an insight into the phenomena which arise in the turbine situation, some experiments were performed to investigate the behaviour of condensing steam flows in a blade passage. This study has revealed the fundamental significance of droplet nucleation in modifying the single-phase flow structure and results are presented which show the change in shock wave pattern when inlet superheat and outlet Mach number are varied. The trailing-edge shock wave structure appears considerably more robust towards variation of inlet superheat than purely one-dimensional considerations may suggest and the inadequacies of adopting a one-dimensional theory to analyse multi-dimensional condensing flows are demonstrated. Over a certain range of outlet Mach numbers an oscillating shock wave will establish in the throat region of the blade passage and this has been shown to interact strongly with droplet nucleation, resulting in a considerably increased mean droplet size. The possible implications of these results for turbine performance are also discussed. (author)

  14. Proliferation of hydroelectric dams in the Andean Amazon and implications for Andes-Amazon connectivity.

    Science.gov (United States)

    Finer, Matt; Jenkins, Clinton N

    2012-01-01

    Due to rising energy demands and abundant untapped potential, hydropower projects are rapidly increasing in the Neotropics. This is especially true in the wet and rugged Andean Amazon, where regional governments are prioritizing new hydroelectric dams as the centerpiece of long-term energy plans. However, the current planning for hydropower lacks adequate regional and basin-scale assessment of potential ecological impacts. This lack of strategic planning is particularly problematic given the intimate link between the Andes and Amazonian flood plain, together one of the most species rich zones on Earth. We examined the potential ecological impacts, in terms of river connectivity and forest loss, of the planned proliferation of hydroelectric dams across all Andean tributaries of the Amazon River. Considering data on the full portfolios of existing and planned dams, along with data on roads and transmission line systems, we developed a new conceptual framework to estimate the relative impacts of all planned dams. There are plans for 151 new dams greater than 2 MW over the next 20 years, more than a 300% increase. These dams would include five of the six major Andean tributaries of the Amazon. Our ecological impact analysis classified 47% of the potential new dams as high impact and just 19% as low impact. Sixty percent of the dams would cause the first major break in connectivity between protected Andean headwaters and the lowland Amazon. More than 80% would drive deforestation due to new roads, transmission lines, or inundation. We conclude with a discussion of three major policy implications of these findings. 1) There is a critical need for further strategic regional and basin scale evaluation of dams. 2) There is an urgent need for a strategic plan to maintain Andes-Amazon connectivity. 3) Reconsideration of hydropower as a low-impact energy source in the Neotropics.

  15. Proliferation of hydroelectric dams in the Andean Amazon and implications for Andes-Amazon connectivity.

    Directory of Open Access Journals (Sweden)

    Matt Finer

    Full Text Available Due to rising energy demands and abundant untapped potential, hydropower projects are rapidly increasing in the Neotropics. This is especially true in the wet and rugged Andean Amazon, where regional governments are prioritizing new hydroelectric dams as the centerpiece of long-term energy plans. However, the current planning for hydropower lacks adequate regional and basin-scale assessment of potential ecological impacts. This lack of strategic planning is particularly problematic given the intimate link between the Andes and Amazonian flood plain, together one of the most species rich zones on Earth. We examined the potential ecological impacts, in terms of river connectivity and forest loss, of the planned proliferation of hydroelectric dams across all Andean tributaries of the Amazon River. Considering data on the full portfolios of existing and planned dams, along with data on roads and transmission line systems, we developed a new conceptual framework to estimate the relative impacts of all planned dams. There are plans for 151 new dams greater than 2 MW over the next 20 years, more than a 300% increase. These dams would include five of the six major Andean tributaries of the Amazon. Our ecological impact analysis classified 47% of the potential new dams as high impact and just 19% as low impact. Sixty percent of the dams would cause the first major break in connectivity between protected Andean headwaters and the lowland Amazon. More than 80% would drive deforestation due to new roads, transmission lines, or inundation. We conclude with a discussion of three major policy implications of these findings. 1 There is a critical need for further strategic regional and basin scale evaluation of dams. 2 There is an urgent need for a strategic plan to maintain Andes-Amazon connectivity. 3 Reconsideration of hydropower as a low-impact energy source in the Neotropics.

  16. Dams and Displacement: Raising the Standards and Broadening the Research Agenda

    Directory of Open Access Journals (Sweden)

    Brooke McDonald-Wilmsen

    2010-06-01

    Full Text Available The World Commission on Dams provided an analytical overview of the cumulative effects of years of dam development. A lack of commitment or capacity to cope with displacement or to consider the civil rights of, or risks to, displaced people led to the impoverishment and suffering of tens of millions and growing opposition to dams by affected communities worldwide. However, after the WCD, little has changed for the better in terms of resettlement policies. In fact, the standards of key agencies, like the Asian Development Bank, have been lowered and diluted compared to prior policies. Dam-induced development and displacement are stifled by a 'managerialist' approach to planning, in which solutions are sought internally and subordinated to the economics that underpins the existence of the project. The aim of successful resettlement is to prevent impoverishment and to enable displaced people to share in the project’s benefits. Within the field of dam-induced resettlement, this is a lofty goal rarely achieved. However, in other fields of resettlement, such as refugee studies and adaptation to environmental change, such a goal is regarded as a minimum standard. In this paper we seek to broaden the research agenda on dam-induced resettlement and to raise the standards of development projects that entail resettlement. We do this by importing some of the considerations and concerns from practice and research from the fields of refugee studies and adaptation to environmental change.

  17. Nonparametric Change Point Diagnosis Method of Concrete Dam Crack Behavior Abnormality

    Directory of Open Access Journals (Sweden)

    Zhanchao Li

    2013-01-01

    Full Text Available The study on diagnosis method of concrete crack behavior abnormality has always been a hot spot and difficulty in the safety monitoring field of hydraulic structure. Based on the performance of concrete dam crack behavior abnormality in parametric statistical model and nonparametric statistical model, the internal relation between concrete dam crack behavior abnormality and statistical change point theory is deeply analyzed from the model structure instability of parametric statistical model and change of sequence distribution law of nonparametric statistical model. On this basis, through the reduction of change point problem, the establishment of basic nonparametric change point model, and asymptotic analysis on test method of basic change point problem, the nonparametric change point diagnosis method of concrete dam crack behavior abnormality is created in consideration of the situation that in practice concrete dam crack behavior may have more abnormality points. And the nonparametric change point diagnosis method of concrete dam crack behavior abnormality is used in the actual project, demonstrating the effectiveness and scientific reasonableness of the method established. Meanwhile, the nonparametric change point diagnosis method of concrete dam crack behavior abnormality has a complete theoretical basis and strong practicality with a broad application prospect in actual project.

  18. Energy demand, economic growth, and energy efficiency - the Bakun dam-induced sustainable energy policy revisited

    International Nuclear Information System (INIS)

    Keong, C.Y.

    2005-01-01

    In embarking on a dynamic course of economic development and industrial modernism, Malaysia sees the need to increase its electricity generation capacity through the development of a mega-dam project - the Bakun dam. Although hydroelectricity generation offers one of the benign options in accommodating the increasing energy consumption per capita in Malaysia, it is argued that the construction of Bakun's dam which involves a complete and irreversible destruction of 69,640 ha of old forest ecosystem remains a difficult and uncertain endeavour. It is further argued that apart from mega-dam technology, there are also other means to orchestrate a sustainable energy system in Malaysia. These include the implementation of demand and supply initiatives, such as the deployment of energy saving technology or influencing behavioral change towards a sustainable energy consumption pattern

  19. 43 CFR 418.29 - Project management.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Project management. 418.29 Section 418.29....29 Project management. In addition to the provisions of § 418.28, if the District is found to be... management of the diversion and outlet works (Derby Dam and Lahontan Dam/Reservoir) or any or all of the...

  20. The Amazon Hydroelectric Dams, an Internal Geopolitical Issue in Brazil

    International Nuclear Information System (INIS)

    Broggio, Celine; Droulers, Martine; Pallamar, Juan-Pablo

    2017-01-01

    This paper develops a geopolitical analysis of dams and hydroelectric plants in the Brazilian Amazon since the mid-2000's. The implementation of these projects has provoked tensions within the federal government under the presidency of the Workers' Party and accelerated the erosion of the ideological and political platform called 'socio-environmentalism', a situation that has led to the break-up of the coalition leading to the political crisis of 2016 and the impeachment of President Dilma Rousseff. From a regional point of view, the dispute occurred in very different terms in the case of the Madeira hydroelectric power stations (Santo Antonio and Jirau in Rondonia) and in the case of the Xingu dam (Belo Monte in Para), worldwide covered by the media

  1. Evaluation of Boundary Dam spillway using an Autonomous Sensor Fish Device

    Energy Technology Data Exchange (ETDEWEB)

    Deng, Z. D.; Duncan, J. P.; Arnold, J. L.; Fu, T.; Martinez, J.; Lu, J.; Titzler, P. S.; Zhou, D.; Mueller, R. P.

    2017-03-01

    Fish passage conditions over spillways are important for the operations of hydroelectric dams because spillways are usually considered as a common alternative passage route to divert fish from the turbines. The objectives of this study were to determine the relative potential of fish injury during spillway passage both before and after the installation of baffle blocks at Boundary Dam, and to provide validation data for a model being used to predict total dissolved gas levels. Sensor Fish were deployed through a release system mounted on the face of the dam in the forebay. Three treatments, based on the lateral position on the spillway, were evaluated for both the baseline and post-modification evaluations: Left Middle, Right Middle, and Right. No significant acceleration events were detected in the forebay, gate, or transition regions for any release location; events were only observed on the chute and in the tailrace. Baseline acceleration events observed in the chute region were all classified as strikes, whereas post-modification events included strike and shear on the chute. While the addition of baffle blocks increased the number of significant events observed on the spillway chute, overall fewer events were observed in the tailrace post-modification. Analysis of lateral positioning of passage indicated that the Right Middle treatment was potentially less injurious to fish based on relative frequency of significant events at each location. The construction of baffle blocks on the spillway visibly changed the flow regime. Prior to installation the flow jet was relatively thin, impacting the tailrace as a coherent stream that plunged deeply, possibly contributing to total dissolved gas production. Following baffle block construction, the discharge jet was more fragmented, potentially disrupting the plunge depth and decreasing the time that bubbles would be at depth in the plunge pool. The results in this study support the expected performance of the modified

  2. Key Impact Factors on Dam Break Fatalities

    Science.gov (United States)

    Huang, D.; Yu, Z.; Song, Y.; Han, D.; Li, Y.

    2016-12-01

    Dam failures can lead to catastrophes on human society. However, there is a lack of research about dam break fatalities, especially on the key factors that affect fatalities. Based on the analysis of historical dam break cases, most studies have used the regression analysis to explore the correlation between those factors and fatalities, but without implementing optimization to find the dominating factors. In order to understand and reduce the risk of fatalities, this study has proposed a new method to select the impact factors on the fatality. It employs an improved ANN (Artificial Neural Network) combined with LOOCV (Leave-one-out cross-validation) and SFS (Stepwise Forward Selection) approach to explore the nonlinear relationship between impact factors and life losses. It not only considers the factors that have been widely used in the literature but also introduces new factors closely involved with fatalities. Dam break cases occurred in China from 1954 to 2013 are summarized, within which twenty-five cases are selected with a comprehensive coverage of geographic position and temporal variation. Twelve impact factors are taken into account as the inputs, i.e., severity of dam break flood (SF), population at risk (PR), public understanding of dam break (UB), warning time (TW), evacuation condition (EC), weather condition during dam break (WB), dam break mode (MB), water storage (SW), building vulnerability (VB), dam break time (TB), average distance from the affected area to the dam (DD) and preventive measures by government (PG).From those, three key factors of SF, MB and TB are chosen. The proposed method is able to extract the key factors, and the derived fatality model performs well in various types of dam break conditions.

  3. Were the hydro dams financed by the World Bank from 1976 to 2005 worthwhile?

    International Nuclear Information System (INIS)

    Awojobi, Omotola; Jenkins, Glenn P.

    2015-01-01

    Because hydro dams are complex to design and usually involve long-term planning, they are particularly susceptible to cost and time overruns. The controversy surrounding their development remains an unresolved issue in the energy policy debate. This study re-examines the cost issues associated with a portfolio of 58 dams that were financed by the World Bank from 1976 to 2005. Further, an estimate is made of the value of the benefits produced by these investments to determine the magnitude of economic rates of return for the individual projects and the overall portfolio of dams. Even though this portfolio of dams suffered substantially from cost overruns, the net contribution of these dams has been positive and substantial. The ex-post real economic rate of return for the entire portfolio is estimated to be greater than 17 percent. The important policy implication of this study is that each investment in a hydro dam needs to be appraised taking into consideration the distribution and probabilities of costs that might be incurred, as well as the potential benefits. Adequate margins must exist of ex-ante benefits over costs to account for the risks of cost overruns. - Highlights: • An ex-post evaluation is made of hydroelectric dams financed by the World Bank. • Cost overruns, time overruns, and the cost of time overruns are measured. • The PV of benefits produced by this portfolio was 1.8 times the PV of the costs. • Real cost overruns were 27% and cost of time overruns 3.5% of ex-ante costs. • Risks of cost overruns must be evaluated in relation to projected benefits of dams.

  4. Comparative Study of Barotrauma Risk during Fish Passage through Kaplan Turbines

    Energy Technology Data Exchange (ETDEWEB)

    Richmond, Marshall C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States). Hydrology Group; Romero-Gomez, Pedro [Pacific Northwest National Lab. (PNNL), Richland, WA (United States). Hydrology Group; Serkowski, John A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States). Hydrology Group; Rakowski, Cynthia L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States). Hydrology Group; Graf, Michael J. [Voith Hydro, York, PA (United States)

    2015-10-01

    Rapid pressure changes in hydroelectric turbine flows can cause barotrauma that can be hazardous to the passage of fish, in particular migratory juvenile salmonids. Although numerous laboratory tests have evaluated the effect of rapid decompression in fish species of relevance, numerical modeling studies offer the advantage of predicting, for new turbine designs, the potential risks of mortality and injury from rapid pressure change during turbine passage. However, rapid pressure change is only one of several hydraulic risks encountered by fish during turbine passage in addition to blade strike, shear, and turbulence. To better understand the role of rapid pressure changes, the present work focuses on the application of a computational fluid dynamics based method for evaluating the risk of pressure-related mortality to fish passing through an early 1960s era original hydroelectric Kaplan turbine at Wanapum Dam (Columbia River, Washington), and a modern advanced Kaplan turbine installed in 2005. The results show that the modeling approach acceptably reproduced the nadir pressure distributions compared to field data previously collected at the site using an autonomous sensor. Our findings show that the new advanced-design unit performs better, in terms of reduced barotrauma risk to fish from exposure to low pressures, than the original turbine unit. The outcomes allow for comparative analyses of turbine designs and operations prior to installation, an advantage that can potentially be integrated in the process of designing new turbine units to achieve superior environmental performance. Overall, the results show that modern turbine designs can achieve the multiple objectives of increasing power generation, lowering cavitation potential, and reducing barotrauma risks to passing fish.

  5. Variability of Ecosystem State in Rivers Containing Natural Dams: A Chemical Analysis

    Science.gov (United States)

    Reynolds, Z. A.

    2015-12-01

    Flooding, and the resulting economic damage to roads and property, is associated with natural dams such as beaver dams or log jams. For this reason, humans often remove natural dams; however, river reaches with natural dams provide very different ecosystem services in comparison with free-flowing river reaches. Therefore, the goal of this project is to assess the differences in ecosystem state between these different river reach types in the northeastern United States. We focused on differences in basic chemistry (e.g., dissolved oxygen, pH, temperature, and organic carbon) to assess the impact of natural dams on river ecosystem state. Study sites include rivers in the White Mountains and southeastern New Hampshire at locations with beaver dams, beaver ponds, beaver meadows, log jams, and free-flowing reaches. Dissolved oxygen, ORP, pH, temperature, and conductivity were measured in the field with a YSI Professional Plus meter. Water samples were collected for subsequent laboratory analysis of total organic carbon with a Shimadzu TOC-L. Preliminary results show that the chemistry of river water varies with feature type. Most significantly, dissolved oxygen concentrations are highest in free-flowing reaches and lowest in beaver ponds. Although beaver ponds are often associated with lower pH, due the increased concentration of organic acids, some beaver ponds can increase pH when compared to free-flowing reaches on the same river. Early results also show that water chemistry returns quickly to the chemistry typical of the free-flowing river reaches after being altered by a natural dam. Overall, natural dams create a river system that has more heterogeneity, and therefore has opportunities to provide more ecosystem functions, than a purely free-flowing river; this can increase the number of supported instream and riparian species. By increasing the understanding of how natural dams affect the chemistry of river water, river engineers can improve their decisions on how

  6. Proceedings of the Canadian dam safety conference

    International Nuclear Information System (INIS)

    1993-01-01

    A conference was held to discuss dam safety. Papers were presented concerning public policy and legislative issues, standards, guidelines and criteria, dam safety reviews, operations and maintenance, technical issues, and case histories. Separate abstracts have been prepared for 18 papers from the conference

  7. The environmental and social acceptability of dams

    OpenAIRE

    Boyé, Henri; Vivo, Michel de

    2016-01-01

    Dams are an ever more vital tool for addressing our growing water needs and the emergence of new challenges such as sustainable development and climate change. However, these infrastructures are still highly controversial around the world. Citing numerous examples, this paper goes over the main points of debate around dams, and the necessary conditions for securing their acceptability.

  8. Descriptive characteristics of the large Italian dams

    International Nuclear Information System (INIS)

    Dello Vicario, E.; Petaccia, A.; Savanella, V.

    1999-01-01

    In the present note the characteristics of the Italian dams are examined, underlining, in a statistical view, story, geographical location, types and use of the most important works. Such a review can be useful for a more detailed analysis, both for the dams characterization and for further studies relevant to water resources utilization [it

  9. Pacific Lamprey Research and Restoration Project, Annual Report 2002.

    Energy Technology Data Exchange (ETDEWEB)

    Close, David; Aronsuu, Kimmo; Jackson, Aaron

    2003-07-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993, Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers (Moser et al. 2002), thus effecting larval recruitment in the basin (Moser and Close in press). Adult Pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River (Close and Jackson 2001). In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River (Close 1999). To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2002.

  10. Proceedings of the CDSA/CANCOLD Joint Dam Safety Conference

    International Nuclear Information System (INIS)

    1997-01-01

    The 1997 conference on large dams was co-sponsored by the Canadian Dam Safety Association and the Canadian National Committee of the International Commission on Large Dams. The conference was held in Montreal in September. A total of 31 papers were presented in seven sessions. Session One was devoted to the 1996 Saguenay Floods, while other sessions dealt with risk management in relation to dams, dam safety programs, embankment dams, and monitoring of dams. A two-part session dealt with issues related to the construction and repair of concrete dams. refs., figs

  11. The Impact of Dam-Reservoir-Foundation Interaction on Nonlinear Response of Concrete Gravity Dams

    Science.gov (United States)

    Amini, AliReza; Motamedi, Mohammad Hossein; Ghaemian, Mohsen

    2008-07-01

    To study the impact of dam-reservoir-foundation interaction on nonlinear response of concrete gravity dams, a two-dimensional finite element model of a concrete gravity dam including the dam body, a part of its foundation and a part of the reservoir was made. In addition, the proper boundary conditions were used in both reservoir and foundation in order to absorb the energy of outgoing waves at the far end boundaries. Using the finite element method and smeared crack approach, some different seismic nonlinear analyses were done and finally, we came to a conclusion that the consideration of dam-reservoir-foundation interaction in nonlinear analysis of concrete dams is of great importance, because from the performance point of view, this interaction significantly improves the nonlinear response of concrete dams.

  12. The Impact of Dam-Reservoir-Foundation Interaction on Nonlinear Response of Concrete Gravity Dams

    International Nuclear Information System (INIS)

    Amini, Ali Reza; Motamedi, Mohammad Hossein; Ghaemian, Mohsen

    2008-01-01

    To study the impact of dam-reservoir-foundation interaction on nonlinear response of concrete gravity dams, a two-dimensional finite element model of a concrete gravity dam including the dam body, a part of its foundation and a part of the reservoir was made. In addition, the proper boundary conditions were used in both reservoir and foundation in order to absorb the energy of outgoing waves at the far end boundaries. Using the finite element method and smeared crack approach, some different seismic nonlinear analyses were done and finally, we came to a conclusion that the consideration of dam-reservoir-foundation interaction in nonlinear analysis of concrete dams is of great importance, because from the performance point of view, this interaction significantly improves the nonlinear response of concrete dams

  13. The microclimate within a Neolithic passage grave

    DEFF Research Database (Denmark)

    Klenz Larsen, Poul; Aasbjerg Jensen, Lars; Ryhl-Svendsen, Morten

    2017-01-01

    Microclimate measurements in a Neolithic passage grave in Denmark have shown that natural ventilation through the open entrance destabilizes the relative humidity (RH), whereas a sealed entrance gives a much more stable RH, above 90%. Episodes of condensation occur on the stone surfaces in summer...... with too much ventilation and in winter with too little ventilation. Soil moisture measurements above, below, and beside the grave mound indicate that rainfall on the mound is not a significant source of moisture to the chamber, whereas the ground below the sealed chamber is constantly moist. The chamber...... can be kept dry all year by putting a moisture barrier membrane over the floor. Apart from the more variable climate within the open chamber, there is also a significant penetration of ozone, which is absent in the sealed chamber. The ozone may have deteriorated the folds of birch bark put between...

  14. Restoring Environmental Flows by Modifying Dam Operations

    Directory of Open Access Journals (Sweden)

    Brian D. Richter

    2007-06-01

    Full Text Available The construction of new dams has become one of the most controversial issues in global efforts to alleviate poverty, improve human health, and strengthen regional economies. Unfortunately, this controversy has overshadowed the tremendous opportunity that exists for modifying the operations of existing dams to recover many of the environmental and social benefits of healthy ecosystems that have been compromised by present modes of dam operation. The potential benefits of dam "re-operation" include recovery of fish, shellfish, and other wildlife populations valued both commercially and recreationally, including estuarine species; reactivation of the flood storage and water purification benefits that occur when floods are allowed to flow into floodplain forests and wetlands; regaining some semblance of the naturally dynamic balance between river erosion and sedimentation that shapes physical habitat complexity, and arresting problems associated with geomorphic imbalances; cultural and spiritual uses of rivers; and many other socially valued products and services. This paper describes an assessment framework that can be used to evaluate the benefits that might be restored through dam re-operation. Assessing the potential benefits of dam re-operation begins by characterizing the dam's effects on the river flow regime, and formulating hypotheses about the ecological and social benefits that might be restored by releasing water from the dam in a manner that more closely resembles natural flow patterns. These hypotheses can be tested by implementing a re-operation plan, tracking the response of the ecosystem, and continually refining dam operations through adaptive management. The paper highlights a number of land and water management strategies useful in implementing a dam re-operation plan, with reference to a variety of management contexts ranging from individual dams to cascades of dams along a river to regional energy grids. Because many of the

  15. Deep temperature variability in Drake Passage

    Science.gov (United States)

    Firing, Yvonne L.; McDonagh, Elaine L.; King, Brian A.; Desbruyères, Damien G.

    2017-01-01

    Observations made on 21 occupations between 1993 and 2016 of GO-SHIP line SR1b in eastern Drake Passage show an average temperature of 0.53°C deeper than 2000 dbar, with no significant trend, but substantial year-to-year variability (standard deviation 0.08°C). Using a neutral density framework to decompose the temperature variability into isopycnal displacement (heave) and isopycnal property change components shows that approximately 95% of the year-to-year variance in deep temperature is due to heave. Changes on isopycnals make a small contribution to year-to-year variability but contribute a significant trend of -1.4 ± 0.6 m°C per year, largest for density (γn) > 28.1, south of the Polar Front (PF). The heave component is depth-coherent and results from either vertical or horizontal motions of neutral density surfaces, which trend upward and northward around the PF, downward for the densest levels in the southern section, and downward and southward in the Subantarctic Front and Southern Antarctic Circumpolar Current Front (SACCF). A proxy for the locations of the Antarctic Circumpolar Current (ACC) fronts is constructed from the repeat hydrographic data and has a strong relationship with deep ocean heat content, explaining 76% of deep temperature variance. The same frontal position proxy based on satellite altimeter-derived surface velocities explains 73% of deep temperature variance. The position of the PF plays the strongest role in this relationship between ACC fronts and deep temperature variability in Drake Passage, although much of the temperature variability in the southern half of the section can be explained by the position of the SACCF.

  16. Research progress on dam-break floods

    KAUST Repository

    Wu, Jiansong

    2011-08-01

    Because of the catastrophic effects downstream of dam-break failure, more and more researchers around the world have been working on the study of dam-break flows to accurately forecast the downstream inundation mapping. With the rapid development of computer hardware and computing techniques, numerical study on dam-break flows has been a popular research subject. In the paper, the numerical methodologies used to solve the governing partial differential equations of dam-break flows are classified and summarized, and their characteristics and applications are discussed respectively. Furthermore, the fully-developed mathematical models developed in recent decades are reviewed, and also introduced the authors\\' on-going work. Finally, some possible future developments on modeling the dam-break flows and some solutions are presented and discussed. © 2011 IEEE.

  17. 'Dam it - it's easy!' - or is it?

    Science.gov (United States)

    Marshall, K

    2017-06-09

    Dentists the world over seem to still have issues in making rubber dam application a routine part of practice, even in situations where patients are obviously at risk. In this article, the author - who has delivered hundreds of seminars and hands on tuition in a quick and easy method of dam application (the 'Dam it - it's Easy!' series) to dentists in the UK, Europe, North America and Asia - highlights the similarity of the misconceptions existing in regard to its use by dentists the world over. The valuable advantages to the environment in the dental treatment room by dental dam application are considered underused. The protection offered by routine rubber dam application is second to none in situations that are potentially physically hazardous to patients.

  18. How fast and robust is the quantum adiabatic passage?

    Science.gov (United States)

    Takahashi, Kazutaka

    2013-08-01

    We study the assisted adiabatic passage, and equivalently the transitionless quantum driving, as a quantum brachistochrone trajectory. The optimal Hamiltonian for given constraints is constructed from the quantum brachistochrone equation. We discuss how the adiabatic passage is realized as the solution of the equation. The formulation of the quantum brachistochrone is based on the principle of least action. We utilize it to discuss the stability of the adiabatic passage.

  19. How fast and robust is the quantum adiabatic passage?

    OpenAIRE

    Takahashi, Kazutaka

    2013-01-01

    We study the assisted adiabatic passage, and equivalently the transitionless quantum driving, as a quantum brachistochrone trajectory. The optimal Hamiltonian for given constraints is constructed from the quantum brachistochrone equation. We discuss how the adiabatic passage is realized as the solution of the equation. The formulation of the quantum brachistochrone is based on the principle of least action. We utilize it to discuss the stability of the adiabatic passage.

  20. Geographical Overview of the Three Gorges Dam and Reservoir, China - Geologic Hazards and Environmental Impacts

    Science.gov (United States)

    Highland, Lynn M.

    2008-01-01

    The Three Gorges Dam and Reservoir on the Yangtze River, China, has been an ambitious and controversial project. The dam, the largest in the world as of 2008, will provide hydropower, help to manage flood conditions, and increase the navigability of the Yangtze River. However, this massive project has displaced human and animal populations and altered the stability of the banks of the Yangtze, and it may intensify the seismic hazard of the area. It has also hindered archeological investigations in the reservoir and dam area. This report, originally in the form of a Microsoft PowerPoint presentation, gives a short history and overview of the dam construction and subsequent consequences, especially geologic hazards already noted or possible in the future. The report provides photographs, diagrams, and references for the reader's further research - a necessity, because this great undertaking is dynamic, and both its problems and successes continue to evolve. The challenges and consequences of Three Gorges Dam will be closely watched and documented as lessons learned and applied to future projects in China and elsewhere.

  1. The social impacts of dams: A new framework for scholarly analysis

    International Nuclear Information System (INIS)

    Kirchherr, Julian; Charles, Katrina J.

    2016-01-01

    No commonly used framework exists in the scholarly study of the social impacts of dams. This hinders comparisons of analyses and thus the accumulation of knowledge. The aim of this paper is to unify scholarly understanding of dams' social impacts via the analysis and aggregation of the various frameworks currently used in the scholarly literature. For this purpose, we have systematically analyzed and aggregated 27 frameworks employed by academics analyzing dams' social impacts (found in a set of 217 articles). A key finding of the analysis is that currently used frameworks are often not specific to dams and thus omit key impacts associated with them. The result of our analysis and aggregation is a new framework for scholarly analysis (which we call ‘matrix framework’) specifically on dams' social impacts, with space, time and value as its key dimensions as well as infrastructure, community and livelihood as its key components. Building on the scholarly understanding of this topic enables us to conceptualize the inherently complex and multidimensional issues of dams' social impacts in a holistic manner. If commonly employed in academia (and possibly in practice), this framework would enable more transparent assessment and comparison of projects.

  2. Re-engineering the state, awakening the nation: Dams, islamist modernity and nationalist politics in Sudan

    Directory of Open Access Journals (Sweden)

    Maimuna Mohamud

    2016-06-01

    Full Text Available This article investigates how and why dam building has fulfilled a crucial role in hegemonic projects of elite consolidation and nation-building. By drawing on the case of Sudan’s Dam Programme and the associated propaganda the Khartoum government has produced, we show how the dams have not just served to materially restructure the Sudanese political economy but have also been essential in the attempted rekindling of the identity of both the regime and the country. Massive investment in hydro-infrastructure dovetailed with the political rebalancing of an authoritarian system in crisis, turning dam-builders into nation-builders: the message of the dams as midwife to a pious, prosperous and revitalised Sudan allowed it to reconcile the nationalism of its military and security wing with the enduring ambitions for transformation of its Islamist base. Dam building in Sudan, as elsewhere, has thus meant a physical redrawing of the landscape and intensified rent creation and seeking but also embodies a high modernist narrative that matches the interests and worldviews of very different constituencies. This, we argue, helps explain its salience in earlier periods of state-building and nation-building, as well as contemporarily

  3. The social impacts of dams: A new framework for scholarly analysis

    Energy Technology Data Exchange (ETDEWEB)

    Kirchherr, Julian, E-mail: julian.kirchherr@sant.ox.ac.uk; Charles, Katrina J., E-mail: katrina.charles@ouce.ox.ac.uk

    2016-09-15

    No commonly used framework exists in the scholarly study of the social impacts of dams. This hinders comparisons of analyses and thus the accumulation of knowledge. The aim of this paper is to unify scholarly understanding of dams' social impacts via the analysis and aggregation of the various frameworks currently used in the scholarly literature. For this purpose, we have systematically analyzed and aggregated 27 frameworks employed by academics analyzing dams' social impacts (found in a set of 217 articles). A key finding of the analysis is that currently used frameworks are often not specific to dams and thus omit key impacts associated with them. The result of our analysis and aggregation is a new framework for scholarly analysis (which we call ‘matrix framework’) specifically on dams' social impacts, with space, time and value as its key dimensions as well as infrastructure, community and livelihood as its key components. Building on the scholarly understanding of this topic enables us to conceptualize the inherently complex and multidimensional issues of dams' social impacts in a holistic manner. If commonly employed in academia (and possibly in practice), this framework would enable more transparent assessment and comparison of projects.

  4. Monitoring and Evaluation of Smolt Migration in the Columbia Basin : Volume XV : Evaluation of the 2007 Predictions of the Run-Timing of Wild and Hatchery-Reared Salmon and Steelhead Smolts to Rock Island, Lower Granite, McNary, John Day, and Bonneville Dams using Program RealTime.

    Energy Technology Data Exchange (ETDEWEB)

    Griswold, Jim; Townsend, Richard L.; Skalski, John R.

    2008-12-01

    Program RealTime provided monitoring and forecasting of the 2007 inseason outmigrations via the internet for 26 PIT-tagged stocks of wild ESU Chinook salmon and steelhead to Lower Granite and/or McNary dams, one PIT-tagged hatchery-reared ESU of sockeye salmon to Lower Granite Dam, one PIT-tagged wild stock of sockeye salmon to McNary Dam, and 20 passage-indexed runs-at-large, five each to Rock Island, McNary, John Day, and Bonneville dams. Nineteen stocks are of wild yearling Chinook salmon which were captured, PIT-tagged, and released at sites above Lower Granite Dam in 2007 and have at least one year's historical migration data previous to the 2007 migration. These stocks originate in 19 tributaries of the Salmon, Grande Ronde and Clearwater Rivers, all tributaries to the Snake River, and are subsequently detected through tag identification and monitored at Lower Granite Dam. Seven wild PIT-tagged runs-at-large of Snake or Upper Columbia River ESU salmon and steelhead were monitored at McNary Dam. Three wild PIT-tagged runs-at-large were monitored at Lower Granite Dam, consisting of the yearling and subyearling Chinook salmon and the steelhead runs. The hatchery-reared PIT-tagged sockeye salmon stock from Redfish Lake was monitored outmigrating through Lower Granite Dam. Passage-indexed stocks (stocks monitored by FPC passage indices) included combined wild and hatchery runs-at-large of subyearling and yearling Chinook, coho, and sockeye salmon, and steelhead forecasted to Rock Island, McNary, John Day, and Bonneville dams.

  5. Deformation Monitoring and Bathymetry Analyses in Rock-Fill Dams, a Case Study at Ataturk Dam

    Science.gov (United States)

    Kalkan, Y.; Bilgi, S.

    2014-12-01

    Turkey has 595 dams constructed between 1936 and 2013 for the purposes of irrigation, flood control, hydroelectric energy and drinking water. A major portion of the dam basins in Turkey are deprived of vegetation and have slope topography on near surrounding area. However, landscaping covered with forest around the dam basin is desirable for erosion control. In fact; the dams, have basins deprived of vegetation, fill up quickly due to sediment transport. Erosion control and forestation are important factors, reducing the sediment, to protect the water basins of the dams and increase the functioning life of the dams. The functioning life of dams is as important as the investment and construction. Nevertheless, in order to provide safety of human life living around, well planned monitoring is essential for dams. Dams are very large and critical structures and they demand the use or application of precise measuring systems. Some basic physical data are very important for assessing the safety and performance of dams. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. Monitoring is an essential component of the dam after construction and during operation and must en­able the timely detection of any behavior that could deteriorate the dam, potentially result in its shutdown or failure. Considering the time and labor consumed by long-term measurements, processing and analysis of measured data, importance of the small structural motions at regular intervals could be comprehended. This study provides some information, safety and the techniques about the deformation monitoring of the dams, dam safety and related analysis. The case study is the deformation measurements of Atatürk Dam in Turkey which is the 6th largest dam of world considering the filling volume of embankment. Brief information is given about the

  6. Lower Granite dam smolt monitoring program: annual report, 2000; ANNUAL

    International Nuclear Information System (INIS)

    Morrill, Charles

    2000-01-01

    The 2000 fish collection season at Lower Granite was characterized by lower than average spring flows and spill, low levels of debris, cool water temperatures, increased unclipped yearling and subyearling chinook smolts, and 8,300,546 smolts collected and transported compared to 5,882,872 in 1999. With the continued release of unclipped supplementation chinook and steelhead above Lower Granite Dam, we can no longer accurately distinguish wild chinook, steelhead, and sockeye/kokanee in the sample. Although some table titles in this report still show ''wild'' column headings, the numbers in these columns for 1999 and 2000 include wild and unclipped hatchery origin smolts. The increases over previous years reflect the increased supplementation. A total of 8,300,546 juvenile salmonids were collected at Lower Granite Dam. Of these, 187,862 fish were bypassed back to the river and 7,950,648 were transported to release sites below Bonneville Dam, 7,778,853 by barge and 171,795 by truck. A total of 151,344 salmonids were examined in daily samples. Nine research projects conducted by four agencies impacted a total of 1,361,006 smolts (16.4% of the total collection)

  7. Balancing Energy, Food Security, and Critical Ecosystems: Dam Siting, Design and Operations in the Mekong River Basin

    Science.gov (United States)

    Wild, T. B.; Reed, P. M.; Loucks, D.

    2016-12-01

    The Mekong River basin in Southeast Asia is one of several river basins with exceptionally high biodiversity value where intensive hydropower dam development is anticipated. In the Mekong basin, over 100 dams are planned to be constructed in the next 20-30 years. As planned, these dams will alter the river's natural water, sediment and nutrient flows, and will fragment fish migration pathways. In doing so, they will degrade one of the world's most productive freshwater fish habitats, upon which some 60 million people depend for food and income security. For those dams that have not yet been constructed, there still exist opportunities to modify their siting, design and operation (SDO) to achieve a more balanced set of tradeoffs among hydropower production, sediment/nutrient passage and adult fish/larvae passage. We present a successful case study wherein we explored such alternative SDO opportunities in partnership with the Government of Cambodia for Sambor Dam, planned to be built on the main stem of the Mekong. Sambor would be one of the world's longest dams, spanning 18 km across the river just upstream of (1) Tonle Sap Lake, which supplies 70% of Cambodians' protein, and (2) the Mekong Delta in Vietnam, responsible for 50% of Vietnam's rice production. We will describe key dam siting and design modifications required to mitigate ecological impacts. We will then focus on the most promising alternative dam siting/design concept, exploring the reservoir operations space to demonstrate that a complex set of tradeoffs exist among a diverse set of energy and ecosystem objectives. Results indicate that even for a hydrologically small reservoir, a wide array of potential reservoir operating policies exist that have vastly different food-energy implications. While some policies would significantly mitigate ecological impacts, many policies exist that would pose a severe threat to the sustainability of the fishery. Failure to sample the reservoir operations space at

  8. The Grand Ethiopian Renaissance Dam: Source of cooperation or contention?

    Science.gov (United States)

    Teferi Taye, Meron; Tadesse, Tsegaye; Senay, Gabriel; Block, Paul

    2016-01-01

    This paper discusses the challenges and benefits of the Grand Ethiopian Renaissance Dam (GERD), which is under construction and expected to be operational on the Blue Nile River in Ethiopia in a few years. Like many large-scale projects on transboundary rivers, the GERD has been criticized for potentially jeopardizing downstream water security and livelihoods through upstream unilateral decision making. In spite of the contentious nature of the project, the authors argue that this project can provide substantial benefits for regional development. The GERD, like any major river infrastructure project, will undeniably bring about social, environmental, and economic change, and in this unique case has, on balance, the potential to achieve success on all fronts. It must be stressed, however, that strong partnerships between riparian countries are essential. National success is contingent on regional cooperation.

  9. Integrated Flood Forecast and Virtual Dam Operation System for Water Resources and Flood Risk Management

    Science.gov (United States)

    Shibuo, Yoshihiro; Ikoma, Eiji; Lawford, Peter; Oyanagi, Misa; Kanauchi, Shizu; Koudelova, Petra; Kitsuregawa, Masaru; Koike, Toshio

    2014-05-01

    While availability of hydrological- and hydrometeorological data shows growing tendency and advanced modeling techniques are emerging, such newly available data and advanced models may not always be applied in the field of decision-making. In this study we present an integrated system of ensemble streamflow forecast (ESP) and virtual dam simulator, which is designed to support river and dam manager's decision making. The system consists of three main functions: real time hydrological model, ESP model, and dam simulator model. In the real time model, the system simulates current condition of river basins, such as soil moisture and river discharges, using LSM coupled distributed hydrological model. The ESP model takes initial condition from the real time model's output and generates ESP, based on numerical weather prediction. The dam simulator model provides virtual dam operation and users can experience impact of dam control on remaining reservoir volume and downstream flood under the anticipated flood forecast. Thus the river and dam managers shall be able to evaluate benefit of priori dam release and flood risk reduction at the same time, on real time basis. Furthermore the system has been developed under the concept of data and models integration, and it is coupled with Data Integration and Analysis System (DIAS) - a Japanese national project for integrating and analyzing massive amount of observational and model data. Therefore it has advantage in direct use of miscellaneous data from point/radar-derived observation, numerical weather prediction output, to satellite imagery stored in data archive. Output of the system is accessible over the web interface, making information available with relative ease, e.g. from ordinary PC to mobile devices. We have been applying the system to the Upper Tone region, located northwest from Tokyo metropolitan area, and we show application example of the system in recent flood events caused by typhoons.

  10. Assessment of whether upstream passage for Lake Sturgeon is needed at the Pointe du Bois Generating Station (Winnipeg River)

    International Nuclear Information System (INIS)

    Pratt, T.

    2010-01-01

    This document reviewed Manitoba Hydro's proposal to modernize the Pointe du Bois Generating Station (GS) on the Winnipeg River, with particular reference to the potential impacts on Lake Sturgeon in Management Unit 5 (MU5) where large numbers of the fish spawn at the base of the falls. The modernization will involve replacing the spillway, dam segments and replacing or repairing the powerhouse. The pros and cons of providing upstream fish passage for Lake Sturgeon and the generating station were outlined. The only spawning area in the MU5 area may be altered considerably due to changes in water flow, depending on the design chosen for modernization. A potential benefit of providing upstream fish passage for Lake Sturgeon would be to increase genetic diversity within the Winnipeg River. Another potential benefit would be to allow Lake Sturgeon, from the relatively dense population below the GS, to move upstream into MU4 where unfilled habitat may be available and Lake Sturgeon abundance is lower. A potential disadvantage of providing fish passage would be the loss of individual Lake Sturgeon from the healthy population in MU5 with no accompanying benefit to MU4. There would be no net gain to MU4 or MU5 if migrating Lake Sturgeon returned to MU5 rather than proceeding upstream. It was concluded that these current gaps in knowledge must be filled in order to fully assess the environmental impacts. 2 figs.

  11. TYPOLOGY OF LARGE DAMS. A REVIEW

    Directory of Open Access Journals (Sweden)

    Gheorghe ROMANESCU

    2015-06-01

    Full Text Available The dams represent hydrotechnical constructions meant to ensure a judicious use of water resources. The international literature is extremely rich in data regarding the large dams on Earth. In this context, a hierarchy of the main dams is attempted and the role they play in the economic development of the regions they were built in is underlined. The largest dams are built on the big rivers in Asia, North America, South America and Africa. The reservoirs have multiple roles: electricity production, drinking or industrial water supply, irrigations, recreation, etc. High costs and land fragility do not allow the construction of dams in the places most affected by drought or flood. This is why they are usually built in mountainous areas, at great distance from the populated centres. On the Romanian territory, there are 246 large dams, built in the hydrographical basins of Siret, Olt, Arges, Somes, etc. The largest rivers on Earth, by discharge, (Amazon and Zair do not also include the largest dams because the landform and the type of flow have not allowed such constructions.

  12. Hydropower, social priorities and the rural–urban development divide: The case of large dams in Cambodia

    International Nuclear Information System (INIS)

    Siciliano, Giuseppina; Urban, Frauke; Kim, Sour; Dara Lonn, Pich

    2015-01-01

    Hydropower investment is a priority in many developing countries, as a means to increase electrification rates and promote national development. However, neglect of dam-affected people's needs, can make them vulnerable to the multifaceted impacts of such projects. Using the case of Cambodia's first large dam, the Kamchay dam, this paper reveals social priorities of affected communities and institutional actors linked to environmental and social implications of large hydropower projects using a preference ranking method. Qualitative research revealed concerns among dam-affected communities which included energy access, livelihood changes, environmental impacts, access to natural resources and compensation. Results also reveal divergence between national and local priorities, which in turn brings about an unequal distribution of costs and benefits of the Kamchay Dam between urban and rural areas. The paper provides recommendations to policy-makers, NGOs and international organizations regarding governance issues, consultation processes and mitigation measures. - Highlights: • We assess social priorities linked to the impacts of a large dam in Cambodia. • We examine differences between local actors in the prioritization of the impacts. • Findings show divergences between national and local priorities of dam construction. • Distribution of cost and benefit is spatially unequal between rural and urban areas.

  13. Applying the World Water and Agriculture Model to Filling Scenarios for the Grand Ethiopian Renaissance Dam

    Energy Technology Data Exchange (ETDEWEB)

    Villa, Daniel L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Tidwell, Vincent C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Passell, Howard D. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Roberts, Barry L. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-11-01

    The World Water and Agriculture Model has been used to simulate water, hydropower, and food sector effects in Egypt, Sudan, and Ethiopia during the filling of the Grand Ethiopian Renaissance Dam reservoir. This unique capability allows tradeoffs to be made between filling policies for the Grand Ethiopian Renaissance Dam reservoir. This Nile River Basin study is presented to illustrate the capacity to use the World Water and Agriculture Model to simulate regional food security issues while keeping a global perspective. The study uses runoff data from the Intergovernmental Panel for Climate Change Coupled Model Inter-comparison Project Phase 5 and information from the literature in order to establish a reasonable set of hydrological initial conditions. Gross Domestic Product and population growth are modelled exogenously based on a composite projection of United Nations and World Bank data. The effects of the Grand Ethiopian Renaissance Dam under various percentages of water withheld are presented.

  14. The Dams and Monitoring Systems and Case Study: Ataturk and Karakaya Dams

    Science.gov (United States)

    Kalkan, Y.; Bilgi, S.; Gülnerman, A. G.

    2017-12-01

    Dams are among the most important engineering structures used for flood controls, agricultural purposes as well as drinking and hydroelectric power. Especially after the Second World War, developments on the construction technology, increase the construction of larger capacity dams. There are more than 150.000 dams in the world and almost 1000 dams in Turkey, according to international criteria. Although dams provide benefits to humans, they possess structural risks too. To determine the performance of dams on structural safety, assessing the spatial data is very important. These are movement, water pressure, seepage, reservoir and tail-water elevations, local seismic activities, total pressure, stress and strain, internal concrete temperature, ambient temperature and precipitation. These physical data are measured and monitored by the instruments and equipment. Dams and their surroundings have to be monitored by using essential methods at periodic time intervals in order to determine the possible changes that may occur over the time. Monitoring programs typically consist of; surveillance or visual observation. These programs on dams provide information for evaluating the dam's performance related to the design intent and expected changes that could affect the safety performance of the dam. Additionally, these programs are used for investigating and evaluating the abnormal or degrading performance where any remedial action is necessary. Geodetic and non-geodetic methods are used for monitoring. Monitoring the performance of the dams is critical for producing and maintaining the safe dams. This study provides some general information on dams and their different monitoring systems by taking into account two different dams and their structural specifications with the required information. The case study in this paper depends on a comparison of the monitoring surveys on Atatürk Dam and Karakaya Dam, which are constructed on Firat River with two different structural

  15. Rites of Passage in Emerging Adulthood: Perspectives of Young Mormons.

    Science.gov (United States)

    Nelson, Larry J.

    2003-01-01

    Explored the role of rites of passage in emerging adulthood among Mormon college students. Found that the majority supported individualistic criteria for adulthood, but most also believed that rites of passage specific to their religion were necessary to become an adult. Determined that emerging adulthood is a distinct period of the life course…

  16. Passage retrieval for question answering using sliding windows

    NARCIS (Netherlands)

    Khalid, M.A.; Verberne, S.

    2008-01-01

    The information retrieval (IR) community has investigated many different techniques to retrieve passages from large collections of documents for question answering (QA). In this paper, we specifically examine and quantitatively compare the impact of passage retrieval for QA using sliding windows and

  17. Adiabatic passage of light in coupled optical waveguides

    International Nuclear Information System (INIS)

    Longhi, Stefano

    2006-01-01

    Adiabatic passage of light in coupled optical waveguides with a curved axis is theoretically investigated and shown to bear a close connection with coherent population transfer among quantum states of atoms and molecules. In particular, the optical analog of stimulated Raman adiabatic passage can be realized in a three-waveguide optical directional coupler

  18. Gender differences in implicit and explicit memory for affective passages.

    Science.gov (United States)

    Burton, Leslie A; Rabin, Laura; Vardy, Susan Bernstein; Frohlich, Jonathan; Wyatt, Gwinne; Dimitri, Diana; Constante, Shimon; Guterman, Elan

    2004-04-01

    Thirty-two participants were administered 4 verbal tasks, an Implicit Affective Task, an Implicit Neutral Task, an Explicit Affective Task, and an Explicit Neutral Task. For the Implicit Tasks, participants were timed while reading passages aloud as quickly as possible, but not so quickly that they did not understand. A target verbal passage was repeated three times, and alternated with other previously unread passages. The Implicit Affective and Neutral passages had strong affective or neutral content, respectively. The Explicit Tasks were administered at the end of testing, and consisted of multiple choice questions regarding the passages. Priming effects in terms of more rapid reading speed for the target compared to non-target passages were seen for both the Implicit Affective Task and the Implicit Neutral Task. Overall reading speed was faster for the passages with neutral compared to affective content, consistent with studies of the emotional Stroop effect. For the Explicit memory tasks, overall performance was better on the items from the repeated passage, and on the Affective compared to Neutral Task. The male subjects showed greater priming for affective material than female subjects, and a greater gain than female subjects in explicit memory for affective compared to neutral material.

  19. Developing an integrated dam safety program

    International Nuclear Information System (INIS)

    Nielsen, N. M.; Lampa, J.

    1996-01-01

    An effort has been made to demonstrate that dam safety is an integral part of asset management which, when properly done, ensures that all objectives relating to safety and compliance, profitability, stakeholders' expectations and customer satisfaction, are achieved. The means to achieving this integration of the dam safety program and the level of effort required for each core function have been identified using the risk management approach to pinpoint vulnerabilities, and subsequently to focus priorities. The process is considered appropriate for any combination of numbers, sizes and uses of dams, and is designed to prevent exposure to unacceptable risks. 5 refs., 1 tab

  20. Reduced Spill at Hydropower Dams: Opportunities for More Generation and Increased Fish Population

    Energy Technology Data Exchange (ETDEWEB)

    Coutant, Charles C [ORNL; Mann, Roger [RMecon, Davis, California; Sale, Michael J [ORNL

    2006-09-01

    This report indicates that reduction of managed spill at hydropower dams can speed implementation of technologies for fish protection and achieve economic goals. Spill of water over spillways is managed in the Columbia River basin to assist downstream-migrating juvenile salmon, and is generally believed to be the most similar to natural migration, benign and effective passage route; other routes include turbines, intake screens with bypasses, and surface bypasses. However, this belief may be misguided, because spill is becoming recognized as less than natural, with deep intakes below normal migration depths, and likely causing physical damages from severe shear on spillways, high turbulence in tail waters, and collisions with baffle blocks that lead to disorientation and predation. Some spillways induce mortalities comparable to turbines. Spill is expensive in lost generation, and controversial. Fish-passage research is leading to more fish-friendly turbines, screens and bypasses that are more effective and less damaging, and surface bypasses that offer passage of more fish per unit water volume than does spill (leaving more water for generation). Analyses by independent economists demonstrated that goals of increased fish survival over the long term and net gain to the economy can be obtained by selectively reducing spill and diverting some of the income from added power generation to research, development, and installation of fish-passage technologies. Such a plan would selectively reduce spill when and where least damaging to fish, increase electricity generation using the water not spilled and use innovative financing to direct monetary gains to improving fish passage.

  1. Downstream fish passage on Black River system

    International Nuclear Information System (INIS)

    Downstream fish passage of juvenile alewife at the Black River hydroelectric system has traditionally been directed by a major screen assembly to a route avoiding altogether four out of five small hydroelectric power plants. This system includes retention of larvae/juveniles in a lake until mid July, diversion of fish via a major screen assembly and by-passing of a station using a fish ladder. However, difficulties with the arrangement have resulted in increasing numbers of fish passing by all five stations. A second option which reduces labour and maintenance activities and promotes increased growth of fish as they pass from reservoir to reservoir involves use of simple fishways coupled with fish pulsers to deflect fish from the station intakes. The fish pulsers use 100 Hz frequency at 20 pulses per minute placed directly in front of the station intake at a depth of 3 m. Both strategies have contributed to increased fish production and migration such that the present run is 5 million to 8 million fish. 4 refs., 4 figs

  2. 50 years of first-passage percolation

    CERN Document Server

    Auffinger, Antonio; Hanson, Jack

    2017-01-01

    First-passage percolation (FPP) is a fundamental model in probability theory that has a wide range of applications to other scientific areas (growth and infection in biology, optimization in computer science, disordered media in physics), as well as other areas of mathematics, including analysis and geometry. FPP was introduced in the 1960s as a random metric space. Although it is simple to define, and despite years of work by leading researchers, many of its central problems remain unsolved. In this book, the authors describe the main results of FPP, with two purposes in mind. First, they give self-contained proofs of seminal results obtained until the 1990s on limit shapes and geodesics. Second, they discuss recent perspectives and directions including (1) tools from metric geometry, (2) applications of concentration of measure, and (3) related growth and competition models. The authors also provide a collection of old and new open questions. This book is intended as a textbook for a graduate course or as a...

  3. Unfrozen sea : sailing the northwest passage

    International Nuclear Information System (INIS)

    Byers, M.

    2007-01-01

    This article described the author's journey into the Canadian Arctic that documented the shrinking sea of Canada's Arctic region. It emphasized the loss of ecosystem and animal habitat. It addressed issues regarding Canada's claims of Arctic sovereignty over disputed waters, such as the Northwest Passage. In March 2006, the area covered during the winter by sea-ice was at an all-time low, namely 300,000 square kilometres less than the previous year. At this rate the Arctic could lose all of its sea-ice by 2030. The article also discussed phytoplankton in the Arctic which, removes carbon dioxide from the atmosphere by photosynthesis. Since the waters they live in are so cold, the phytoplankton sink into the ocean depths when they die, without decomposing. The carbon they removed from the atmosphere remains at the bottom of the sea for hundreds of years. However, as water warms up, the activity of marine bacteria that feed on the dead plankton will increase, releasing carbon dioxide back into the atmosphere. Issues related to international shipping, navigation, ownership of Arctic islands, military presence and boats in the northern channels, and political promises with respect to the Canadian Coast Guard and northern waterways were also discussed. 1 fig

  4. Grouting of the cracks in the Arch 5-6 Daniel Johnson dam

    International Nuclear Information System (INIS)

    Lariviere, R.; Routhier, L.; Roy, V.; Saleh, K.; Tremblay, S.

    1999-01-01

    The Daniel-Johnson dam is located 800 km northeast of Montreal, PQ, and is 1314 m in length and 214 m high. Just after completion of dam construction different types of cracks started to appear on the upstream and downstream faces. During and after the construction of the dam, numerous cracks and joints were grouted in order to reduce water infiltration. In some cases, as a result of high injection pressures and inaccurate methods, the injections provoked the propagation of the existing cracks or the initiation of new ones. Because of this situation and to determine the contribution of injection to dam safety, in 1985, Hydro-Quebec applied a moratorium on all future injection work on the dam. Research work was initiated in 1986 in the areas of grouting materials, methods, equipment and behavioral analysis to establish a safe method for the injection of the cracks. A committee was formed in 1993 with members from various groups, in order to: carry out extensive behavioral analysis of the Arch 5-6 dam, carry out an investigation program in order to determine the cause of the increase of the water infiltration, undertake a structural analysis program in order to evaluate the impact of an injection on the safety of the dam, and identify the proper method and injection products to use. In 1997, as a result of the progress of the structural analysis studies and the injection research project, a decision was made to proceed with the injection of the dam. A description is included of the results of the investigation, recommendations and results of the injection research project, as well as some details of the grouting campaign carried out in January 1999. On the whole, a better knowledge was acquired of the structure, of the plunging cracks and the behaviour of the dam during the injection. In the field of injection methods, materials and equipment, research work was invaluable when it came to the injection of micro-fine cracks in concrete dams. 5 refs., 8 figs

  5. Predictions of total deformations in Jebba main dam by finite ...

    African Journals Online (AJOL)

    This paper examined the deformations of the Jebba Main Dam, Jebba Nigeria using the finite element method. The study also evaluated the predicted deformations and compared them with the actual deformations in the dam to identify possible causes of the observed longitudinal crack at the dam crest. The Jebba dam is a ...

  6. The geomorphic legacy of small dams — An Austrian study

    NARCIS (Netherlands)

    Poeppl, R.E.; Keesstra, S.D.; Hein, T.

    2015-01-01

    Dams represent one of the most dominant forms of human impact upon fluvial systems during the Anthropocene, as they disrupt the downstream transfer of water and sediments. Removing dams restores river continuity and channel morphology. Both dam construction and dam removal induce geomorphic channel

  7. Mystery of Mosul Dam the Most Dangerous Dam in the World:Karstification and Sinkholes

    OpenAIRE

    Al-Ansari, Nadhir; Adamo, Nasrat; Issa, Issa; Sissakian, Varoujan; Knutsson, Sven

    2015-01-01

    The Fatha (ex-Lower Fars) Formation (Middle Miocene) is the predominant stratigraphic unit in the Mosul Dam area. It is about 250 meters thick near Mosul. Marls, chalky limestone, gypsum, anhydrite, and limestone form a layered sequence of rocks under the foundation of the dam. The foundation of the dam is mainly resting on the Fatha Formation (Middle Miocene) which is highly karstified. Karstic limestone and the development of solution cavities within the gypsum and anhydrite layers are the ...

  8. Social impacts of Brazil's Tucurui Dam

    Energy Technology Data Exchange (ETDEWEB)

    Fearnside, P.M.

    1999-11-01

    The Tucurui Dam, which blocked the Tocantins River in 1984 in Brazil's eastern Amazonian state of Para, is a continuing source of controversy. Most benefits of the power go to aluminum smelting companies, where only a tiny amount of employment is generated. Often presented by authorities as a model for hydroelectric development because of the substantial power that it produces, the project's social and environmental impacts are also substantial. Examination of Tucurui reveals a systematic overestimation of benefits and underestimation of impacts as presented by authorities. Tucurui offers many as-yet unlearned lessons for hydroelectric development in Amazonia.

  9. Study on Semi-Parametric Statistical Model of Safety Monitoring of Cracks in Concrete Dams

    Directory of Open Access Journals (Sweden)

    Chongshi Gu

    2013-01-01

    Full Text Available Cracks are one of the hidden dangers in concrete dams. The study on safety monitoring models of concrete dam cracks has always been difficult. Using the parametric statistical model of safety monitoring of cracks in concrete dams, with the help of the semi-parametric statistical theory, and considering the abnormal behaviors of these cracks, the semi-parametric statistical model of safety monitoring of concrete dam cracks is established to overcome the limitation of the parametric model in expressing the objective model. Previous projects show that the semi-parametric statistical model has a stronger fitting effect and has a better explanation for cracks in concrete dams than the parametric statistical model. However, when used for forecast, the forecast capability of the semi-parametric statistical model is equivalent to that of the parametric statistical model. The modeling of the semi-parametric statistical model is simple, has a reasonable principle, and has a strong practicality, with a good application prospect in the actual project.

  10. Setting Passing Scores on Passage-Based Tests: A Comparison of Traditional and Single-Passage Bookmark Methods

    Science.gov (United States)

    Skaggs, Gary; Hein, Serge F.; Awuor, Risper

    2007-01-01

    In this study, a variation of the bookmark standard setting procedure for passage-based tests is proposed in which separate ordered item booklets are created for the items associated with each passage. This variation is compared to the traditional bookmark procedure for a fifth-grade reading test. The results showed that the single-passage…

  11. The strengthening of the Lavaud-Gelade dam; Le confortement de la digue de Lavaud-Gelade

    Energy Technology Data Exchange (ETDEWEB)

    Devos, J.C. [IDTPE, Direction Regionale de l`Industrie, de la Recherche et de l`Environnement (DRIRE), (France); Legras, F. [ITPE, (France)

    1996-12-31

    The Lavaud-Gelade dam (Creuse, France) was built in 1931 and operated by Electricite de France (EdF) since 1946. It is made of loam (clay and sand) with a stone protective cover. The progressive increase of leaks which started in 1982 has led to a project of strengthening of the dam which is detailed in this paper (conclusion of the safety studies, works and costs). The surveillance system has been modified and improved too. (J.S.)

  12. Dam break analysis and flood inundation map of Krisak dam for emergency action plan

    Science.gov (United States)

    Juliastuti, Setyandito, Oki

    2017-11-01

    The Indonesian Regulation which refers to the ICOLD Regulation (International Committee on Large Dam required have the Emergency Action Plan (EAP) guidelines because of the dams have potential failure. In EAP guidelines there is a management of evacuation where the determination of the inundation map based on flood modeling. The purpose of the EAP is to minimize the risk of loss of life and property in downstream which caused by dam failure. This paper will describe about develop flood modeling and inundation map in Krisak dam using numerical methods through dam break analysis (DBA) using hydraulic model Zhong Xing HY-21. The approaches of dam failure simulation are overtopping and piping. Overtopping simulation based on quadrangular, triangular and trapezium fracture. Piping simulation based on cracks of orifice. Using results of DBA, hazard classification of Krisak dam is very high. The nearest village affected dam failure is Singodutan village (distance is 1.45 kilometer from dam) with inundation depth is 1.85 meter. This result can be used by stakeholders such as emergency responders and the community at risk in formulating evacuation procedure.

  13. 76 FR 34799 - Permanent Dam Safety Modification at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams, TN

    Science.gov (United States)

    2011-06-14

    ... TENNESSEE VALLEY AUTHORITY Permanent Dam Safety Modification at Cherokee, Fort Loudoun, Tellico, and Watts Bar Dams, TN AGENCY: Tennessee Valley Authority. ACTION: Notice of intent. SUMMARY: This... existing dam facilities at Cherokee, Fort Loudoun, Tellico, and Watts Bar dams in Tennessee. The level of...

  14. 33 CFR 208.19 - Marshall Ford Dam and Reservoir (Mansfield Dam and Lake Travis), Colorado River, Tex.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Marshall Ford Dam and Reservoir (Mansfield Dam and Lake Travis), Colorado River, Tex. 208.19 Section 208.19 Navigation and Navigable Waters... Marshall Ford Dam and Reservoir (Mansfield Dam and Lake Travis), Colorado River, Tex. The Secretary of the...

  15. Industrial design of an earth overflow dam

    Energy Technology Data Exchange (ETDEWEB)

    Pravdivets, Yu.P.

    1988-06-01

    As a result of theoretical and experimental investigations of earth overflow dams of various types and purpose conducted by the author in the past ten years, methods of calculating the stability of protective structures of riprap, reinforcement meshes, gabions, and in situ and precast reinforced concrete were substantiated; the limits of economic applicability of various types of revetments and structures were determined; and new efficient designs of dams and revetments allowing the overflow of water with large discharge intensities were proposed. An earth overflow dam with the downstream slope protected by a precast reinforced-concrete revetment was determined to be the most effective design-technological solution. Both the entire dam or a part of it can be made overflow. The design has been realized on a number of experimental water-management objects which are reviewed.

  16. Dams life; La vie des barrages

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This paper summarizes the conclusions of the annual inspections of French dams in operation (fissures, water oozing, concrete swelling etc..). Only the observations which require a special attention are reported. (J.S.)

  17. Biological - Elwha River Dam Removal Study

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This study examines the ecosystem response of the Elwha River to the removal of the Elwha River dams. We will measure the following attributes of ecosystem response:...

  18. Physical - Elwha River Dam Removal Study

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This study examines the ecosystem response of the Elwha River to the removal of the Elwha River dams. We will measure the following attributes of ecosystem response:...

  19. Seismic risks at Elsie Lake Main Dam

    International Nuclear Information System (INIS)

    McCammon, N.R.; Momenzadeh, M.; Hawson, H.H.; Nielsen, N.M.

    1991-01-01

    The Elsie Lake dams are located on Vancouver Island in an area of high seismic risk. A safety review in 1986 indicated potential deficiencies in the earthfill main dam with respect to modern earthquake design standards. A detailed field investigation program comprising drilling and penetration tests was carried out and the results used in an assessment of seismic stability. A 0.8 m thick less dense layer in the granular shell of the dam, possibly caused by wet construction conditions, would likely liquefy in a major earthquake but sufficient residual strength would likely remain to prevent catastrophic failure. The dam shell might undergo some distortion, and an assessment was initiated to determine the requirements for reservoir drawdown following an extreme earthquake to ensure the timely lowering of the reservoir for inspection and repair. It was suggested that an adequate evacuation capability would be 25% and 50% drawdown in not more than 30 and 50 days, respectively. 9 refs., 11 figs., 1 tab

  20. Fish ladder of Lajeado Dam: migrations on one-way routes?

    Directory of Open Access Journals (Sweden)

    Angelo Antônio Agostinho

    Full Text Available Fish ladders are generally conceived to reestablish connectivity among critical habitats for migratory species, thus mitigating the impacts of the blockage of migration routes by dams. If this management tool is to be meaningful for conserving fish species, it must provide a fully permeable connection and assure both upward and downward movements. However, because reservoirs have very different hydrodynamics than the original river, it is expected that, at least in the inner area, they may constitute an additional barrier to this movement, especially for descending fish. Thus, the present study sought to determine if migratory fish and their offspring disperse downstream from the dam after ascending a ladder and spawning in the upper reaches of a basin. To achieve this purpose, we evaluated the limitation imposed by lentic areas to the descent of eggs, larvae and adults of migratory species; we also determined the abundance and composition of larvae present in the plankton near the dam, and compared the intensity of the upward and downward movements of adult fish. Samples of ichthyoplankton were taken upriver, inside the reservoir, in the river downstream from the dam, and in the forebay of the Lajeado Dam on the Tocantins River (Luis Eduardo Magalhães Hydroelectric Plant, from October, 1999 through September, 2004. The densities of fish ascending and descending the ladder were determined experimentally on eight occasions, from June, 2004 to March, 2005. Due to difficulties in identifying the true fish origin (up or down in the environments connected by the fish passage system, the evaluation of the distribution of migratory fish in reservoirs was based on the landings of the commercial fishery conducted along the Itaipu Reservoir during the four years preceding (2001 through 2003 the construction of the lateral channel (fish-passage mechanism. Fish eggs and larvae drifting down the Tocantins River did not appear in samples taken in the lower