  1. Advanced fuel cycle cost estimation model and its cost estimation results for three nuclear fuel cycles using a dynamic model in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sungki, E-mail: sgkim1@kaeri.re.kr [Korea Atomic Energy Research Institute, 1045 Daedeokdaero, Yuseong-gu, Daejeon 305-353 (Korea, Republic of); Ko, Wonil [Korea Atomic Energy Research Institute, 1045 Daedeokdaero, Yuseong-gu, Daejeon 305-353 (Korea, Republic of); Youn, Saerom; Gao, Ruxing [University of Science and Technology, 217 Gajungro, Yuseong-gu, Daejeon 305-350 (Korea, Republic of); Bang, Sungsig, E-mail: ssbang@kaist.ac.kr [Korea Advanced Institute of Science and Technology, Department of Business and Technology Management, 291 Deahak-ro, Yuseong-gu, Daejeon 305-701 (Korea, Republic of)

    2015-11-15

    Highlights: • The nuclear fuel cycle cost using a new cost estimation model was analyzed. • The material flows of three nuclear fuel cycle options were calculated. • The generation cost of once-through was estimated to be 66.88 mills/kW h. • The generation cost of pyro-SFR recycling was estimated to be 78.06 mills/kW h. • The reactor cost was identified as the main cost driver of pyro-SFR recycling. - Abstract: The present study analyzes advanced nuclear fuel cycle cost estimation models such as the different discount rate model and its cost estimation results. To do so, an analysis of the nuclear fuel cycle cost of three options (direct disposal (once through), PWR–MOX (Mixed OXide fuel), and Pyro-SFR (Sodium-cooled Fast Reactor)) from the viewpoint of economic sense, focusing on the cost estimation model, was conducted using a dynamic model. From an analysis of the fuel cycle cost estimation results, it was found that some cost gap exists between the traditional same discount rate model and the advanced different discount rate model. However, this gap does not change the priority of the nuclear fuel cycle option from the viewpoint of economics. In addition, the fuel cycle costs of OT (Once-Through) and Pyro-SFR recycling based on the most likely value using a probabilistic cost estimation except for reactor costs were calculated to be 8.75 mills/kW h and 8.30 mills/kW h, respectively. Namely, the Pyro-SFR recycling option was more economical than the direct disposal option. However, if the reactor cost is considered, the economic sense in the generation cost between the two options (direct disposal vs. Pyro-SFR recycling) can be changed because of the high reactor cost of an SFR.

  2. Fast Reactor Fuel Cycle Cost Estimates for Advanced Fuel Cycle Studies

    International Nuclear Information System (INIS)

    Harrison, Thomas

    2013-01-01

    Presentation Outline: • Why Do I Need a Cost Basis?; • History of the Advanced Fuel Cycle Cost Basis; • Description of the Cost Basis; • Current Work; • Fast Reactor Fuel Cycle Applications; • Sample Fuel Cycle Cost Estimate Analysis; • Future Work

  3. Advanced Composite Air Frame Life Cycle Cost Estimating

    Science.gov (United States)

    2014-06-19

    the ACCA based on the cost . This cost analysis takes into account the increased performance parameters of the new airframe structure. This research...20 Advanced Composite Cargo Aircraft ( ACCA ) ..........................................................23 viii Cost Estimation...establishing the procurement strategies and life cycle cost (LCC) model cost estimations. The current LCC models do not take into account the potential cost

  4. Aircraft bi-level life cycle cost estimation

    NARCIS (Netherlands)

    Zhao, X.; Verhagen, W.J.C.; Curan, R.

    2015-01-01

    n an integrated aircraft design and analysis practice, Life Cycle Cost (LCC) is essential for decision making. The LCC of an aircraft is ordinarily partially estimated by emphasizing a specific cost type. However, an overview of the LCC including design and development cost, production cost,

  5. MONITORED GEOLOGIC REPOSITORY LIFE CYCLE COST ESTIMATE ASSUMPTIONS DOCUMENT

    International Nuclear Information System (INIS)

    R.E. Sweeney

    2001-01-01

    The purpose of this assumptions document is to provide general scope, strategy, technical basis, schedule and cost assumptions for the Monitored Geologic Repository (MGR) life cycle cost (LCC) estimate and schedule update incorporating information from the Viability Assessment (VA) , License Application Design Selection (LADS), 1999 Update to the Total System Life Cycle Cost (TSLCC) estimate and from other related and updated information. This document is intended to generally follow the assumptions outlined in the previous MGR cost estimates and as further prescribed by DOE guidance

  6. Monitored Geologic Repository Life Cycle Cost Estimate Assumptions Document

    International Nuclear Information System (INIS)

    Sweeney, R.

    2000-01-01

    The purpose of this assumptions document is to provide general scope, strategy, technical basis, schedule and cost assumptions for the Monitored Geologic Repository (MGR) life cycle cost estimate and schedule update incorporating information from the Viability Assessment (VA), License Application Design Selection (LADS), 1999 Update to the Total System Life Cycle Cost (TSLCC) estimate and from other related and updated information. This document is intended to generally follow the assumptions outlined in the previous MGR cost estimates and as further prescribed by DOE guidance

  7. Cost estimation and management over the life cycle of metallurgical ...

    African Journals Online (AJOL)

    This study investigates whether all expected costs over the life cycle of metallurgical research projects are included in initial, normal and fi nal cost estimates, and whether these costs are managed throughout a project's life cycle since there is not enough emphasis on the accurate estimation of costs and their management ...

  8. An Adjusted Discount Rate Model for Fuel Cycle Cost Estimation

    Energy Technology Data Exchange (ETDEWEB)

    Kim, S. K.; Kang, G. B.; Ko, W. I. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-10-15

    Owing to the diverse nuclear fuel cycle options available, including direct disposal, it is necessary to select the optimum nuclear fuel cycles in consideration of the political and social environments as well as the technical stability and economic efficiency of each country. Economic efficiency is therefore one of the significant evaluation standards. In particular, because nuclear fuel cycle cost may vary in each country, and the estimated cost usually prevails over the real cost, when evaluating the economic efficiency, any existing uncertainty needs to be removed when possible to produce reliable cost information. Many countries still do not have reprocessing facilities, and no globally commercialized HLW (High-level waste) repository is available. A nuclear fuel cycle cost estimation model is therefore inevitably subject to uncertainty. This paper analyzes the uncertainty arising out of a nuclear fuel cycle cost evaluation from the viewpoint of a cost estimation model. Compared to the same discount rate model, the nuclear fuel cycle cost of a different discount rate model is reduced because the generation quantity as denominator in Equation has been discounted. Namely, if the discount rate reduces in the back-end process of the nuclear fuel cycle, the nuclear fuel cycle cost is also reduced. Further, it was found that the cost of the same discount rate model is overestimated compared with the different discount rate model as a whole.

  9. An Adjusted Discount Rate Model for Fuel Cycle Cost Estimation

    International Nuclear Information System (INIS)

    Kim, S. K.; Kang, G. B.; Ko, W. I.

    2013-01-01

    Owing to the diverse nuclear fuel cycle options available, including direct disposal, it is necessary to select the optimum nuclear fuel cycles in consideration of the political and social environments as well as the technical stability and economic efficiency of each country. Economic efficiency is therefore one of the significant evaluation standards. In particular, because nuclear fuel cycle cost may vary in each country, and the estimated cost usually prevails over the real cost, when evaluating the economic efficiency, any existing uncertainty needs to be removed when possible to produce reliable cost information. Many countries still do not have reprocessing facilities, and no globally commercialized HLW (High-level waste) repository is available. A nuclear fuel cycle cost estimation model is therefore inevitably subject to uncertainty. This paper analyzes the uncertainty arising out of a nuclear fuel cycle cost evaluation from the viewpoint of a cost estimation model. Compared to the same discount rate model, the nuclear fuel cycle cost of a different discount rate model is reduced because the generation quantity as denominator in Equation has been discounted. Namely, if the discount rate reduces in the back-end process of the nuclear fuel cycle, the nuclear fuel cycle cost is also reduced. Further, it was found that the cost of the same discount rate model is overestimated compared with the different discount rate model as a whole

  10. ICPP tank farm closure study. Volume III: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    International Nuclear Information System (INIS)

    1998-02-01

    This volume contains information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the six options described in Volume 1, Section 2: Option 1 -- Total removal clean closure; No subsequent use; Option 2 -- Risk-based clean closure; LLW fill; Option 3 -- Risk-based clean closure; CERCLA fill; Option 4 -- Close to RCRA landfill standards; LLW fill; Option 5 -- Close to RCRA landfill standards; CERCLA fill; and Option 6 -- Close to RCRA landfill standards; Clean fill. This volume is divided into two portions. The first portion contains the cost and planning schedule estimates while the second portion contains life-cycle costs and yearly cash flow information for each option

  11. Stochastic cost estimating in repository life-cycle cost analysis

    International Nuclear Information System (INIS)

    Tzemos, S.; Dippold, D.

    1986-01-01

    The conceptual development, the design, and the final construction and operation of a nuclear repository span many decades. Given this lengthy time frame, it is quite challenging to obtain a good approximation of the repository life-cycle cost. One can deal with this challenge by using an analytic method, the method of moments, to explicitly assess the uncertainty of the estimate. A series expansion is used to approximate the uncertainty distribution of the cost estimate. In this paper, the moment methodology is derived and is illustrated through a numerical example. The range of validity of the approximation is discussed. The method of moments is compared to the traditional stochastic cost estimating methods and found to provide more and better information on cost uncertainty. The tow methods converge to identical results as the number of convolved variables increases and approaches the range where the central limit theorem is valid

  12. Life cycle cost and risk estimation of environmental management options

    International Nuclear Information System (INIS)

    Shropshire, D.; Sherick, M.

    1996-01-01

    The evaluation process is demonstrated in this paper through comparative analysis of two alternative scenarios identified for the management of the alpha-contaminated fixed low-level waste currently stored at INEL. These two scenarios, the Base Case and the Delay Case, are realistic and based on actual data, but are not intended to exactly match actual plans currently being developed at INEL. Life cycle cost estimates were developed for both scenarios using the System Cost Model; resulting costs are presented and compared. Life cycle costs are shown as a function of time and also aggregated by pretreatment, treatment, storage, and disposal activities. Although there are some short-term cost savings for the Delay Case, cumulative life cycle costs eventually become much higher than costs for the Base Case over the same period of time, due mainly to the storage and repackaging necessary to accommodate the longer Delay Case schedule. Life cycle risk estimates were prepared using a new risk analysis method adapted to the System Cost Model architecture for automated, systematic cost/risk applications. Relative risk summaries are presented for both scenarios as a function of time and also aggregated by pretreatment, treatment, storage, and disposal activities. Relative risk of the Delay Case is shown to be higher than that of the Base Case. Finally, risk and cost results are combined to show how the collective information can be used to help identify opportunities for risk or cost reduction and highlight areas where risk reduction can be achieved most economically

  13. Cost Engineering Techniques and Their Applicability for Cost Estimation of Organic Rankine Cycle Systems

    Directory of Open Access Journals (Sweden)

    Sanne Lemmens

    2016-06-01

    Full Text Available The potential of organic Rankine cycle (ORC systems is acknowledged by both considerable research and development efforts and an increasing number of applications. Most research aims at improving ORC systems through technical performance optimization of various cycle architectures and working fluids. The assessment and optimization of technical feasibility is at the core of ORC development. Nonetheless, economic feasibility is often decisive when it comes down to considering practical instalments, and therefore an increasing number of publications include an estimate of the costs of the designed ORC system. Various methods are used to estimate ORC costs but the resulting values are rarely discussed with respect to accuracy and validity. The aim of this paper is to provide insight into the methods used to estimate these costs and open the discussion about the interpretation of these results. A review of cost engineering practices shows there has been a long tradition of industrial cost estimation. Several techniques have been developed, but the expected accuracy range of the best techniques used in research varies between 10% and 30%. The quality of the estimates could be improved by establishing up-to-date correlations for the ORC industry in particular. Secondly, the rapidly growing ORC cost literature is briefly reviewed. A graph summarizing the estimated ORC investment costs displays a pattern of decreasing costs for increasing power output. Knowledge on the actual costs of real ORC modules and projects remains scarce. Finally, the investment costs of a known heat recovery ORC system are discussed and the methodologies and accuracies of several approaches are demonstrated using this case as benchmark. The best results are obtained with factorial estimation techniques such as the module costing technique, but the accuracies may diverge by up to +30%. Development of correlations and multiplication factors for ORC technology in particular is

  14. Life cycle cost estimation and systems analysis of Waste Management Facilities

    International Nuclear Information System (INIS)

    Shropshire, D.; Feizollahi, F.

    1995-01-01

    This paper presents general conclusions from application of a system cost analysis method developed by the United States Department of Energy (DOE), Waste Management Division (WM), Waste Management Facilities Costs Information (WMFCI) program. The WMFCI method has been used to assess the DOE complex-wide management of radioactive, hazardous, and mixed wastes. The Idaho Engineering Laboratory, along with its subcontractor Morrison Knudsen Corporation, has been responsible for developing and applying the WMFCI cost analysis method. The cost analyses are based on system planning level life-cycle costs. The costs for life-cycle waste management activities estimated by WMFCI range from bench-scale testing and developmental work needed to design and construct a facility, facility permitting and startup, operation and maintenance, to the final decontamination, decommissioning, and closure of the facility. For DOE complex-wide assessments, cost estimates have been developed at the treatment, storage, and disposal module level and rolled up for each DOE installation. Discussions include conclusions reached by studies covering complex-wide consolidation of treatment, storage, and disposal facilities, system cost modeling, system costs sensitivity, system cost optimization, and the integration of WM waste with the environmental restoration and decontamination and decommissioning secondary wastes

  15. ICPP calcined solids storage facility closure study. Volume II: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    International Nuclear Information System (INIS)

    1998-02-01

    This document contains Volume II of the Closure Study for the Idaho Chemical Processing Plant Calcined Solids Storage Facility. This volume contains draft information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the four options described in Volume I: (1) Risk-Based Clean Closure; NRC Class C fill, (2) Risk-Based Clean Closure; Clean fill, (3) Closure to landfill Standards; NRC Class C fill, and (4) Closure to Landfill Standards; Clean fill

  16. ICPP calcined solids storage facility closure study. Volume II: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This document contains Volume II of the Closure Study for the Idaho Chemical Processing Plant Calcined Solids Storage Facility. This volume contains draft information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the four options described in Volume I: (1) Risk-Based Clean Closure; NRC Class C fill, (2) Risk-Based Clean Closure; Clean fill, (3) Closure to landfill Standards; NRC Class C fill, and (4) Closure to Landfill Standards; Clean fill.

  17. Uncertainty quantification metrics for whole product life cycle cost estimates in aerospace innovation

    Science.gov (United States)

    Schwabe, O.; Shehab, E.; Erkoyuncu, J.

    2015-08-01

    The lack of defensible methods for quantifying cost estimate uncertainty over the whole product life cycle of aerospace innovations such as propulsion systems or airframes poses a significant challenge to the creation of accurate and defensible cost estimates. Based on the axiomatic definition of uncertainty as the actual prediction error of the cost estimate, this paper provides a comprehensive overview of metrics used for the uncertainty quantification of cost estimates based on a literature review, an evaluation of publicly funded projects such as part of the CORDIS or Horizon 2020 programs, and an analysis of established approaches used by organizations such NASA, the U.S. Department of Defence, the ESA, and various commercial companies. The metrics are categorized based on their foundational character (foundations), their use in practice (state-of-practice), their availability for practice (state-of-art) and those suggested for future exploration (state-of-future). Insights gained were that a variety of uncertainty quantification metrics exist whose suitability depends on the volatility of available relevant information, as defined by technical and cost readiness level, and the number of whole product life cycle phases the estimate is intended to be valid for. Information volatility and number of whole product life cycle phases can hereby be considered as defining multi-dimensional probability fields admitting various uncertainty quantification metric families with identifiable thresholds for transitioning between them. The key research gaps identified were the lacking guidance grounded in theory for the selection of uncertainty quantification metrics and lacking practical alternatives to metrics based on the Central Limit Theorem. An innovative uncertainty quantification framework consisting of; a set-theory based typology, a data library, a classification system, and a corresponding input-output model are put forward to address this research gap as the basis

  18. Procedure for estimating facility decommissioning costs for non-fuel-cycle nuclear facilities

    International Nuclear Information System (INIS)

    Short, S.M.

    1988-01-01

    The Nuclear Regulatory Commission (NRC) staff has been reappraising its regulatory position relative to the decommissioning of nuclear facilities over the last several years. Approximately 30 reports covering the technology, safety, and costs of decommissioning reference nuclear facilities have been published during this period in support of this effort. One of these reports, Technology, Safety, and Costs of Decommissioning Reference Non-Fuel-Cycle Nuclear Facilities (NUREG/CR-1754), was published in 1981 and was felt by the NRC staff to be outdated. The Pacific Northwest Laboratory (PNL) was asked by the NRC staff to revise the information provided in this report to reflect the latest information on decommissioning technology and costs and publish the results as an addendum to the previous report. During the course of this study, the NRC staff also asked that PNL provide a simplified procedure for estimating decommissioning costs of non-fuel-cycle nuclear facilities. The purpose being to provide NRC staff with the means to easily generate their own estimate of decommissioning costs for a given facility for comparison against a licensee's submittal. This report presents the procedure developed for use by NRC staff

  19. Approaches in estimation of external cost for fuel cycles in the ExternE project

    International Nuclear Information System (INIS)

    Afanas'ev, A.A.; Maksimenko, B.N.

    1998-01-01

    The purposes, content and main results of studies realized within the frameworks of the International Project ExternE which is the first comprehensive attempt to develop general approach to estimation of external cost for different fuel cycles based on utilization of nuclear and fossil fuels, as well as on renewable power sources are discussed. The external cost of a fuel cycle is treated as social and environmental expenditures which are not taken into account by energy producers and consumers, i.e. these are expenditures not included into commercial cost nowadays. The conclusion on applicability of the approach suggested for estimation of population health hazards and environmental impacts connected with electric power generation growth (expressed in money or some other form) is made

  20. Statistical model for forecasting uranium prices to estimate the nuclear fuel cycle cost

    International Nuclear Information System (INIS)

    Kim, Sung Ki; Ko, Won Il; Nam, Hyoon; Kim, Chul Min; Chung, Yang Hon; Bang, Sung Sig

    2017-01-01

    This paper presents a method for forecasting future uranium prices that is used as input data to calculate the uranium cost, which is a rational key cost driver of the nuclear fuel cycle cost. In other words, the statistical autoregressive integrated moving average (ARIMA) model and existing engineering cost estimation method, the so-called escalation rate model, were subjected to a comparative analysis. When the uranium price was forecasted in 2015, the margin of error of the ARIMA model forecasting was calculated and found to be 5.4%, whereas the escalation rate model was found to have a margin of error of 7.32%. Thus, it was verified that the ARIMA model is more suitable than the escalation rate model at decreasing uncertainty in nuclear fuel cycle cost calculation

  1. Statistical model for forecasting uranium prices to estimate the nuclear fuel cycle cost

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung Ki; Ko, Won Il; Nam, Hyoon [Nuclear Fuel Cycle Analysis, Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Kim, Chul Min; Chung, Yang Hon; Bang, Sung Sig [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of)

    2017-08-15

    This paper presents a method for forecasting future uranium prices that is used as input data to calculate the uranium cost, which is a rational key cost driver of the nuclear fuel cycle cost. In other words, the statistical autoregressive integrated moving average (ARIMA) model and existing engineering cost estimation method, the so-called escalation rate model, were subjected to a comparative analysis. When the uranium price was forecasted in 2015, the margin of error of the ARIMA model forecasting was calculated and found to be 5.4%, whereas the escalation rate model was found to have a margin of error of 7.32%. Thus, it was verified that the ARIMA model is more suitable than the escalation rate model at decreasing uncertainty in nuclear fuel cycle cost calculation.

  2. IVF cycle cost estimation using Activity Based Costing and Monte Carlo simulation.

    Science.gov (United States)

    Cassettari, Lucia; Mosca, Marco; Mosca, Roberto; Rolando, Fabio; Costa, Mauro; Pisaturo, Valerio

    2016-03-01

    The Authors present a new methodological approach in stochastic regime to determine the actual costs of an healthcare process. The paper specifically shows the application of the methodology for the determination of the cost of an Assisted reproductive technology (ART) treatment in Italy. The reason of this research comes from the fact that deterministic regime is inadequate to implement an accurate estimate of the cost of this particular treatment. In fact the durations of the different activities involved are unfixed and described by means of frequency distributions. Hence the need to determine in addition to the mean value of the cost, the interval within which it is intended to vary with a known confidence level. Consequently the cost obtained for each type of cycle investigated (in vitro fertilization and embryo transfer with or without intracytoplasmic sperm injection), shows tolerance intervals around the mean value sufficiently restricted as to make the data obtained statistically robust and therefore usable also as reference for any benchmark with other Countries. It should be noted that under a methodological point of view the approach was rigorous. In fact it was used both the technique of Activity Based Costing for determining the cost of individual activities of the process both the Monte Carlo simulation, with control of experimental error, for the construction of the tolerance intervals on the final result.

  3. Major weapon system environmental life-cycle cost estimating for Conservation, Cleanup, Compliance and Pollution Prevention (C3P2)

    Science.gov (United States)

    Hammond, Wesley; Thurston, Marland; Hood, Christopher

    1995-01-01

    The Titan 4 Space Launch Vehicle Program is one of many major weapon system programs that have modified acquisition plans and operational procedures to meet new, stringent environmental rules and regulations. The Environmental Protection Agency (EPA) and the Department of Defense (DOD) mandate to reduce the use of ozone depleting chemicals (ODC's) is just one of the regulatory changes that has affected the program. In the last few years, public environmental awareness, coupled with stricter environmental regulations, has created the need for DOD to produce environmental life-cycle cost estimates (ELCCE) for every major weapon system acquisition program. The environmental impact of the weapon system must be assessed and budgeted, considering all costs, from cradle to grave. The Office of the Secretary of Defense (OSD) has proposed that organizations consider Conservation, Cleanup, Compliance and Pollution Prevention (C(sup 3)P(sup 2)) issues associated with each acquisition program to assess life-cycle impacts and costs. The Air Force selected the Titan 4 system as the pilot program for estimating life-cycle environmental costs. The estimating task required participants to develop an ELCCE methodology, collect data to test the methodology and produce a credible cost estimate within the DOD C(sup 3)P(sup 2) definition. The estimating methodology included using the Program Office weapon system description and work breakdown structure together with operational site and manufacturing plant visits to identify environmental cost drivers. The results of the Titan IV ELCCE process are discussed and expanded to demonstrate how they can be applied to satisfy any life-cycle environmental cost estimating requirement.

  4. Estimates of Canadian fuel fabrication costs for alternative fuel cycles and systems

    International Nuclear Information System (INIS)

    Blahnik, C.

    1979-04-01

    Unit fuel fabrication costs are estimated for alternate fuel cycles and systems that may be of interest in Ontario Hydro's strategy analyses. A method is proposed for deriving the unit fuel fabrication price to be paid by a Canadian utility as a function of time (i.e. the price that reflects the changing demand/supply situation in the particular scenario considered). (auth)

  5. Advanced Fuel Cycle Cost Basis

    Energy Technology Data Exchange (ETDEWEB)

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

    2009-12-01

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

  6. Advanced Fuel Cycle Cost Basis

    Energy Technology Data Exchange (ETDEWEB)

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert

    2007-04-01

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 26 cost modules—24 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, and high-level waste.

  7. Advanced Fuel Cycle Cost Basis

    Energy Technology Data Exchange (ETDEWEB)

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

    2008-03-01

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

  8. MRS/IS facility co-located with a repository: preconceptual design and life-cycle cost estimates

    International Nuclear Information System (INIS)

    Smith, R.I.; Nesbitt, J.F.

    1982-11-01

    A program is described to examine the various alternatives for monitored retrievable storage (MRS) and interim storage (IS) of spent nuclear fuel, solidified high-level waste (HLW), and transuranic (TRU) waste until appropriate geologic repository/repositories are available. The objectives of this study are: (1) to develop a preconceptual design for an MRS/IS facility that would become the principal surface facility for a deep geologic repository when the repository is opened, (2) to examine various issues such as transportation of wastes, licensing of the facility, and environmental concerns associated with operation of such a facility, and (3) to estimate the life cycle costs of the facility when operated in response to a set of scenarios which define the quantities and types of waste requiring storage in specific time periods, which generally span the years from 1990 until 2016. The life cycle costs estimated in this study include: the capital expenditures for structures, casks and/or drywells, storage areas and pads, and transfer equipment; the cost of staff labor, supplies, and services; and the incremental cost of transporting the waste materials from the site of origin to the MRS/IS facility. Three scenarios are examined to develop estimates of life cycle costs of the MRS/IS facility. In the first scenario, HLW canisters are stored, starting in 1990, until the co-located repository is opened in the year 1998. Additional reprocessing plants and repositories are placed in service at various intervals. In the second scenario, spent fuel is stored, starting in 1990, because the reprocessing plants are delayed in starting operations by 10 years, but no HLW is stored because the repositories open on schedule. In the third scenario, HLW is stored, starting in 1990, because the repositories are delayed 10 years, but the reprocessing plants open on schedule

  9. Future trends of light-water reactor fuel-cycle costs

    International Nuclear Information System (INIS)

    Tamiya, S.; Otomo, T.; Meguro, T.

    1977-01-01

    In past cost estimates, the main fuel-cycle components were mining and milling, uranium enrichment and fuel fabrication, and the reprocessing charge deemed to be recovered by plutonium credit. Since the oil crisis, all costs of fuel-cycle components have increased as well as construction costs of power stations. Recent analysis shows that costs in the back-end of the fuel cycle are much higher than those anticipated several years ago, although their contribution to the nuclear electricity generating cost would be small. This situation has now changed but there are still many uncertainties, i.e. regulatory requirements for reprocessing plants concerning safety, safeguards, environmental protection and high-level waste management. Thus it is more difficult to estimate overall investments and, therefore, the costs of the back-end of the fuel-cycle sector. This paper reviews the future trend of nuclear fuel-cycle costs of LWRs, based on recent analysis; and those factors which affect fuel-cycle costs are discussed. To reduce the uncertainties of the cost estimates as soon as possible, international discussion is necessary on items such as the treatment and disposal of high-level radioactive wastes, siting reprocessing plants, physical protection of plutonium, and the effects of plutonium on the environment. (author)

  10. Power generation costs for alternate reactor fuel cycles

    International Nuclear Information System (INIS)

    Smolen, G.R.; Delene, J.G.

    1980-09-01

    The total electric generating costs at the power plant busbar are estimated for various nuclear reactor fuel cycles which may be considered for power generation in the future. The reactor systems include pressurized water reactors (PWR), heavy-water reactors (HWR), high-temperature gas cooled reactors (HTGR), liquid-metal fast breeder reactors (LMFBR), light-water pre-breeder and breeder reactors (LWPR, LWBR), and a fast mixed spectrum reactor (FMSR). Fuel cycles include once-through, uranium-only recycle, and full recycle of the uranium and plutonium in the spent fuel assemblies. The U 3 O 8 price for economic transition from once-through LWR fuel cycles to both PWR recycle and LMFBR systems is estimated. Electric power generation costs were determined both for a reference set of unit cost parameters and for a range of uncertainty in these parameters. In addition, cost sensitivity parameters are provided so that independent estimations can be made for alternate cost assumptions

  11. A review on future trends of LWR fuel cycle costs

    International Nuclear Information System (INIS)

    Tamiya, S.; Otomo, T.; Meguro, T.

    1977-01-01

    In the cost estimations in the past, the main components of fuel cycle were mining and milling, uranium enrichment and fuel fabrication, and reprocessing charge deemed to be recovered by plutonium credit. Since the oil crisis, every component of fuel cycle cost has gone up in recent years as well as the construction cost of a power station. Recent analysis shows that the costs in the back end of fuel cycle are much higher than those anticipated several years ago, although their contribution to the electricity generating cost by nuclear would be small. The situation of the back end of the fuel cycle has been quite changed in recent years, and there are still many uncertainties in this field, that is, regulatory requirements for reprocessing plant such as safety, safeguards, environmental protection and high level waste management. So, it makes it more difficult to estimate the investment in this sector of fuel cycle, therefore, to estimate the cost of this sector. The institutional problems must be cleared in relation to the ultimate disposal of high level waste, too. Co-location of some parts of fuel cycle facilities may also affect on the fuel cycle costs. In this paper a review is made of the future trend of nuclear fuel cycle cost of LWR based on the recent analysis. Those factors which affect the fuel cycle costs are also discussed. In order to reduce the uncertainties of the cost estimations as soon as possible, the necessity is emphasized to discuss internationally such items as the treatment and disposal of high level radioactive wastes, siting issues of a reprocessing plant, physical protection of plutonium and the effects of plutonium on the environment

  12. Nuclear fuel cycle cost estimation and sensitivity analysis of unit costs on the basis of an equilibrium model

    International Nuclear Information System (INIS)

    Kim, S. K.; Ko, W. I.; You, S. R.; Gao, R. X.

    2015-01-01

    This paper examines the difference in the value of the nuclear fuel cycle cost calculated by the deterministic and probabilistic methods on the basis of an equilibrium model. Calculating using the deterministic method, the direct disposal cost and Pyro-SFR (sodium-cooled fast reactor) nuclear fuel cycle cost, including the reactor cost, were found to be 66.41 mills/kWh and 77.82 mills/kWh, respectively (1 mill = one thousand of a dollar, i.e., 10-3 $). This is because the cost of SFR is considerably expensive. Calculating again using the probabilistic method, however, the direct disposal cost and Pyro-SFR nuclear fuel cycle cost, excluding the reactor cost, were found be 7.47 mills/kWh and 6.40 mills/kWh, respectively, on the basis of the most likely value. This is because the nuclear fuel cycle cost is significantly affected by the standard deviation and the mean of the unit cost that includes uncertainty. Thus, it is judged that not only the deterministic method, but also the probabilistic method, would also be necessary to evaluate the nuclear fuel cycle cost. By analyzing the sensitivity of the unit cost in each phase of the nuclear fuel cycle, it was found that the uranium unit price is the most influential factor in determining nuclear fuel cycle costs.

  13. The social cost of fuel cycles

    International Nuclear Information System (INIS)

    Pearce, D.; Bann, C.; Georgiou, S.

    1992-01-01

    This report was commissioned by the UK Department of Energy. Its purpose is to survey the available literature on the monetary estimation of the social costs of energy production and use. We focus on the social costs of electricity production. The report is not intended to convey original research. Nonetheless, the report does take various estimates of social cost and shows how they might be converted to monetary 'social cost surcharges' or externality adders in a UK context. It is also important to appreciate that the literature surveyed is on the monetary costs of fuel cycles. (author)

  14. External costs of the nuclear fuel cycle. A scoping study to determine the external costs of the Dutch nuclear fuel cycle in accordance with the EC/US methodology

    International Nuclear Information System (INIS)

    Dodd, D.H.

    1995-10-01

    This report describes the results of a scoping study to estimate the external costs of the Dutch nuclear fuel cycle. This study was performed within the framework of the Commission of the European Community's External Costs of Fuel Cycles project. The external costs of a fuel cycle are those costs which are excluded from the standard calculation of the cost of electricity. These costs are borne by society as a whole and include, in particular, the health and environmental costs which result from the operation of the facilities involved in a given fuel cycle. At present the uranium enrichment, electricity generation and interim storage stages of the nuclear fuel cycle take place in the Netherlands. These stages of the Dutch nuclear fuel cycle have been studied in detail and the external costs associated with thse stages estimated using up-to-date site specific data. The other stages of the Dutch nuclear fuel cycle do not currently take place in the Netherlands. In general the external costs associated with these stages have been estimated using data from the literature. Relatively few transports of radioactive materials associated with the Dutch nuclear fuel cycle take place in the Netherlands and the external costs associated with all transports has been based on values in the literature. (orig.)

  15. External costs of the nuclear fuel cycle. A scoping study to determine the external costs of the Dutch nuclear fuel cycle in accordance with the EC/US methodology

    Energy Technology Data Exchange (ETDEWEB)

    Dodd, D H

    1995-10-01

    This report describes the results of a scoping study to estimate the external costs of the Dutch nuclear fuel cycle. This study was performed within the framework of the Commission of the European Community`s External Costs of Fuel Cycles project. The external costs of a fuel cycle are those costs which are excluded from the standard calculation of the cost of electricity. These costs are borne by society as a whole and include, in particular, the health and environmental costs which result from the operation of the facilities involved in a given fuel cycle. At present the uranium enrichment, electricity generation and interim storage stages of the nuclear fuel cycle take place in the Netherlands. These stages of the Dutch nuclear fuel cycle have been studied in detail and the external costs associated with thse stages estimated using up-to-date site specific data. The other stages of the Dutch nuclear fuel cycle do not currently take place in the Netherlands. In general the external costs associated with these stages have been estimated using data from the literature. Relatively few transports of radioactive materials associated with the Dutch nuclear fuel cycle take place in the Netherlands and the external costs associated with all transports has been based on values in the literature. (orig.).

  16. Implementation of a Cost-Accounting System for Visibility of Weapon Systems Life-Cycle Costs

    National Research Council Canada - National Science Library

    Ugone, Mary

    2001-01-01

    ... costs through activity-based costing and management. The system must deliver timely, integrated data for management purposes to permit understanding of total weapon costs, provide a basis for estimating costs of future systems, and feed other tools for life-cycle cost management.

  17. Cost and energy consumption estimates for the aluminum-air battery anode fuel cycle

    Science.gov (United States)

    1990-01-01

    At the request of DOE's Office of Energy Storage and Distribution (OESD), Pacific Northwest Laboratory (PNL) conducted a study to generate estimates of the energy use and costs associated with the aluminum anode fuel cycle of the aluminum-air (Al-air) battery. The results of this analysis indicate that the cost and energy consumption characteristics of the mechanically rechargeable Al-air battery system are not as attractive as some other electrically rechargeable electric vehicle battery systems being developed by OESD. However, there are distinct advantages to mechanically rechargeable batteries, which may make the Al-air battery (or other mechanically rechargeable batteries) attractive for other uses, such as stand-alone applications. Fuel cells, such as the proton exchange membrane (PEM), and advanced secondary batteries may be better suited to electric vehicle applications.

  18. A Life-Cycle Cost Estimating Methodology for NASA-Developed Air Traffic Control Decision Support Tools

    Science.gov (United States)

    Wang, Jianzhong Jay; Datta, Koushik; Landis, Michael R. (Technical Monitor)

    2002-01-01

    This paper describes the development of a life-cycle cost (LCC) estimating methodology for air traffic control Decision Support Tools (DSTs) under development by the National Aeronautics and Space Administration (NASA), using a combination of parametric, analogy, and expert opinion methods. There is no one standard methodology and technique that is used by NASA or by the Federal Aviation Administration (FAA) for LCC estimation of prospective Decision Support Tools. Some of the frequently used methodologies include bottom-up, analogy, top-down, parametric, expert judgement, and Parkinson's Law. The developed LCC estimating methodology can be visualized as a three-dimensional matrix where the three axes represent coverage, estimation, and timing. This paper focuses on the three characteristics of this methodology that correspond to the three axes.

  19. Review of the cost estimate and schedule for the 2240-MWt high-temperature gas-cooled reactor steam-cycle/cogeneration lead plant

    International Nuclear Information System (INIS)

    1983-09-01

    This report documents Bechtel's review of the cost estimate and schedule for the 2240 MWt High Temperature Gas-Cooled Reactor Steam Cycle/Cogeneration (HTGR-SC/C) Lead Plant. The overall objective of the review is to verify that the 1982 update of the cost estimate and schedule for the Lead Plant are reasonable and consistent with current power plant experience

  20. Methodology for estimating reprocessing costs for nuclear fuels

    International Nuclear Information System (INIS)

    Carter, W.L.; Rainey, R.H.

    1980-02-01

    A technological and economic evaluation of reprocessing requirements for alternate fuel cycles requires a common assessment method and a common basis to which various cycles can be related. A methodology is described for the assessment of alternate fuel cycles utilizing a side-by-side comparison of functional flow diagrams of major areas of the reprocessing plant with corresponding diagrams of the well-developed Purex process as installed in the Barnwell Nuclear Fuel Plant (BNFP). The BNFP treats 1500 metric tons of uranium per year (MTU/yr). Complexity and capacity factors are determined for adjusting the estimated facility and equipment costs of BNFP to determine the corresponding costs for the alternate fuel cycle. Costs of capacities other than the reference 1500 MT of heavy metal per year are estimated by the use of scaling factors. Unit costs of reprocessed fuel are calculated using a discounted cash flow analysis for three economic bases to show the effect of low-risk, typical, and high-risk financing methods

  1. The System Cost Model: A tool for life cycle cost and risk analysis

    International Nuclear Information System (INIS)

    Hsu, K.; Lundeen, A.; Shropshire, D.; Sherick, M.

    1996-01-01

    In May of 1994, Lockheed Idaho Technologies Company (LITCO) in Idaho Falls, Idaho and subcontractors began development of the System Cost Model (SCM) application. The SCM estimates life cycle costs of the entire US Department of Energy (DOE) complex for designing; constructing; operating; and decommissioning treatment, storage, and disposal (TSD) facilities for mixed low-level, low-level, and transuranic waste. The SCM uses parametric cost functions to estimate life cycle costs for various treatment, storage, and disposal modules which reflect planned and existing waste management facilities at DOE installations. In addition, SCM can model new TSD facilities based on capacity needs over the program life cycle. The user can provide input data (default data is included in the SCM) including the volume and nature of waste to be managed, the time period over which the waste is to be managed, and the configuration of the waste management complex (i.e., where each installation's generated waste will be treated, stored, and disposed). Then the SCM uses parametric cost equations to estimate the costs of pre-operations (designing), construction, operations and maintenance, and decommissioning these waste management facilities. The SCM also provides transportation costs for DOE wastes. Transportation costs are provided for truck and rail and include transport of contact-handled, remote-handled, and alpha (transuranic) wastes. A complement to the SCM is the System Cost Model-Risk (SCM-R) model, which provides relative Environmental, Safety, and Health (ES and H) risk information. A relative ES and H risk basis has been developed and applied by LITCO at the INEL. The risk basis is now being automated in the SCM-R to facilitate rapid risk analysis of system alternatives. The added risk functionality will allow combined cost and risk evaluation of EM alternatives

  2. Gas fired combined cycle plant in Singapore: energy use, GWP and cost-a life cycle approach

    International Nuclear Information System (INIS)

    Kannan, R.; Leong, K.C.; Osman, Ramli; Ho, H.K.; Tso, C.P.

    2005-01-01

    A life cycle assessment was performed to quantify the non-renewable (fossil) energy use and global warming potential (GWP) in electricity generation from a typical gas fired combined cycle power plant in Singapore. The cost of electricity generation was estimated using a life cycle cost analysis (LCCA) tool. The life cycle assessment (LCA) of a 367.5 MW gas fired combined cycle power plant operating in Singapore revealed that hidden processes consume about 8% additional energy in addition to the fuel embedded energy, and the hidden GWP is about 18%. The natural gas consumed during the operational phase accounted for 82% of the life cycle cost of electricity generation. An empirical relation between plant efficiency and life cycle energy use and GWP in addition to a scenario for electricity cost with varying gas prices and plant efficiency have been established

  3. Nuclear generating station and heavy water plant cost estimates for strategy studies

    International Nuclear Information System (INIS)

    Archinoff, G.H.

    1979-07-01

    Nuclear generating station capital, operating and maintenance costs are basic input data for strategy analyses of alternate nuclear fuel cycles. This report presents estimates of these costs for natural uranium CANDU stations, CANDU stations operating on advanced fuel cycles, and liquid metal fast breeder reactors. Cost estimates for heavy water plants are also presented. The results show that station capital costs for advanced fuel cycles are not expected to be significantly greater than those for natural uranium stations. LMFBR capital costs are expected to be 25-30 percent greater than for CANDU's. (auth)

  4. Estimating Externalities of Natural Gas Fuel Cycles, Report 4

    Energy Technology Data Exchange (ETDEWEB)

    Barnthouse, L.W.; Cada, G.F.; Cheng, M.-D.; Easterly, C.E.; Kroodsma, R.L.; Lee, R.; Shriner, D.S.; Tolbert, V.R.; Turner, R.S.

    1998-01-01

    This report describes methods for estimating the external costs (and possibly benefits) to human health and the environment that result from natural gas fuel cycles. Although the concept of externalities is far from simple or precise, it generally refers to effects on individuals' well being, that result from a production or market activity in which the individuals do not participate, or are not fully compensated. In the past two years, the methodological approach that this report describes has quickly become a worldwide standard for estimating externalities of fuel cycles. The approach is generally applicable to any fuel cycle in which a resource, such as coal, hydro, or biomass, is used to generate electric power. This particular report focuses on the production activities, pollution, and impacts when natural gas is used to generate electric power. In the 1990s, natural gas technologies have become, in many countries, the least expensive to build and operate. The scope of this report is on how to estimate the value of externalities--where value is defined as individuals' willingness to pay for beneficial effects, or to avoid undesirable ones. This report is about the methodologies to estimate these externalities, not about how to internalize them through regulations or other public policies. Notwithstanding this limit in scope, consideration of externalities can not be done without considering regulatory, insurance, and other considerations because these institutional factors affect whether costs (and benefits) are in fact external, or whether they are already somehow internalized within the electric power market. Although this report considers such factors to some extent, much analysis yet remains to assess the extent to which estimated costs are indeed external. This report is one of a series of reports on estimating the externalities of fuel cycles. The other reports are on the coal, oil, biomass, hydro, and nuclear fuel cycles, and on general

  5. Life-cycle costs for the Department of Energy waste management programmatic environmental impact statement (draft)

    International Nuclear Information System (INIS)

    Sherick, M.J.; Shropshire, D.E.; Hsu, K.M.

    1995-08-01

    The U.S. Department of Energy (DOE) Office of Environmental Management has produced a Programmatic Environmental Impact Statement (PEIS) in order to assess the potential consequences resulting from a cross section of possible waste management strategies for the DOE complex. The PEIS has been prepared in compliance with the National Environmental Policy Act, and includes evaluations of a variety of alternatives. The analysis performed for the PEIS included the development of life-cycle cost estimates for the different waste management alternatives being considered. These cost estimates were used in the PEIS to support the identification and evaluation of economic impacts. Information developed during the preparation of the life-cycle cost estimates was also used to support risk and socioeconomic analyses performed for each of the alternatives. This technical report provides an overview of the methodology used to develop the life-cycle cost estimates for the PEIS alternatives. The methodology that was applied made use of the Waste Management Facility Cost Information Reports, which provided a consistent approach and estimating basis for the PEIS cost evaluations. By maintaining consistency throughout the cost analyses, life-cycle costs of the various alternatives can be compared and evaluated on a relative basis. This technical report also includes the life-cycle cost estimate results for each of the PEIS alternatives evaluated. Summary graphs showing the results for each waste type are provided in the main document, and tables showing different breakdowns of the cost estimates are provided in the Appendices A-D. Appendix E contains PEIS cost information that was developed using an approach different than the standard methodology described in this report

  6. Radioactive materials transportation life-cycle cost

    International Nuclear Information System (INIS)

    Gregory, P.C.; Donovan, K.S.; Spooner, O.R.

    1993-01-01

    This paper discusses factors that should be considered when estimating the life-cycle cost of shipping radioactive materials and the development of a working model that has been successfully used. Today's environmental concerns have produced an increased emphasis on cleanup and restoration of production plants and interim storage sites for radioactive materials. The need to transport these radioactive materials to processing facilities or permanent repositories is offset by the reality of limited resources and ever-tightening budgets. Obtaining the true cost of transportation is often difficult because of the many direct and indirect costs involved and the variety of methods used to account for fixed and variable expenses. In order to make valid comparisons between the cost of alternate transportation systems for new and/or existing programs, one should consider more than just the cost of capital equipment or freight cost per mile. Of special interest is the cost of design, fabrication, use, and maintenance of shipping containers in accordance with the requirements of the U.S. Nuclear Regulatory Commission. A spread sheet model was developed to compare the life-cycle costs of alternate fleet configurations of TRUPACT-II, which will be used to ship transuranic waste from U.S. Department of Energy sites to the Waste Isolation Pilot Plant near Carlsbad, New Mexico

  7. Advanced Fuel Cycle Cost Basis – 2017 Edition

    Energy Technology Data Exchange (ETDEWEB)

    Dixon, B. W. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Ganda, F. [Argonne National Lab. (ANL), Argonne, IL (United States); Williams, K. A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hoffman, E. [Argonne National Lab. (ANL), Argonne, IL (United States); Hanson, J. K. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2017-09-29

    This report, commissioned by the U.S. Department of Energy (DOE) Office of Nuclear Energy (NE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the DOE Nuclear Technology Research and Development (NTRD) Program (previously the Fuel Cycle Research and Development (FCRD) and the Advanced Fuel Cycle Initiative (AFCI)). The report describes the NTRD cost basis development process, reference information on NTRD cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for numerous fuel cycle cost modules (modules A-O) as well as cost modules for a number of reactor types (R modules). The fuel cycle cost modules were developed in the areas of natural uranium mining and milling, thorium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, managed decay storage, recycled product storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste. Since its inception, this report has been periodically updated. The last such internal document was published in August 2015 while the last external edition was published in December of 2009 as INL/EXT-07-12107 and is available on the Web at URL: www.inl.gov/technicalpublications/Documents/4536700.pdf. This current report (Sept 2017) is planned to be reviewed for external release, at which time it will replace the 2009 report as an external publication. This information is used in the ongoing evaluation of nuclear fuel cycles by the NE NTRD program.

  8. Improving Life-Cycle Cost Management of Spacecraft Missions

    Science.gov (United States)

    Clardy, Dennon

    2010-01-01

    This presentation will explore the results of a recent NASA Life-Cycle Cost study and how project managers can use the findings and recommendations to improve planning and coordination early in the formulation cycle and avoid common pitfalls resulting in cost overruns. The typical NASA space science mission will exceed both the initial estimated and the confirmed life-cycle costs by the end of the mission. In a fixed-budget environment, these overruns translate to delays in starting or launching future missions, or in the worst case can lead to cancelled missions. Some of these overruns are due to issues outside the control of the project; others are due to the unpredictable problems (unknown unknowns) that can affect any development project. However, a recent study of life-cycle cost growth by the Discovery and New Frontiers Program Office identified a number of areas that are within the scope of project management to address. The study also found that the majority of the underlying causes for cost overruns are embedded in the project approach during the formulation and early design phases, but the actual impacts typically are not experienced until late in the project life cycle. Thus, project management focus in key areas such as integrated schedule development, management structure and contractor communications processes, heritage and technology assumptions, and operations planning, can be used to validate initial cost assumptions and set in place management processes to avoid the common pitfalls resulting in cost overruns.

  9. Optimizing power plant cycling operations while reducing generating plant damage and costs

    Energy Technology Data Exchange (ETDEWEB)

    Lefton, S A; Besuner, P H; Grimsrud, P [Aptech Engineering Services, Inc., Sunnyvale, CA (United States); Bissel, A [Electric Supply Board, Dublin (Ireland)

    1999-12-31

    This presentation describes a method for analyzing, quantifying, and minimizing the total cost of fossil, combined cycle, and pumped hydro power plant cycling operation. The method has been developed, refined, and applied during engineering studies at some 160 units in the United States and 8 units at the Irish Electric Supply Board (ESB) generating system. The basic premise of these studies was that utilities are underestimating the cost of cycling operation. The studies showed that the cost of cycling conventional boiler/turbine fossil power plants can range from between $2,500 and $500,000 per start-stop cycle. It was found that utilities typically estimate these costs by factors of 3 to 30 below actual costs and, thus, often significantly underestimate their true cycling costs. Knowledge of the actual, or total, cost of cycling will reduce power production costs by enabling utilities to more accurately dispatch their units to manage unit life expectancies, maintenance strategies and reliability. Utility management responses to these costs are presented and utility cost savings have been demonstrated. (orig.) 7 refs.

  10. Optimizing power plant cycling operations while reducing generating plant damage and costs

    Energy Technology Data Exchange (ETDEWEB)

    Lefton, S.A.; Besuner, P.H.; Grimsrud, P. [Aptech Engineering Services, Inc., Sunnyvale, CA (United States); Bissel, A. [Electric Supply Board, Dublin (Ireland)

    1998-12-31

    This presentation describes a method for analyzing, quantifying, and minimizing the total cost of fossil, combined cycle, and pumped hydro power plant cycling operation. The method has been developed, refined, and applied during engineering studies at some 160 units in the United States and 8 units at the Irish Electric Supply Board (ESB) generating system. The basic premise of these studies was that utilities are underestimating the cost of cycling operation. The studies showed that the cost of cycling conventional boiler/turbine fossil power plants can range from between $2,500 and $500,000 per start-stop cycle. It was found that utilities typically estimate these costs by factors of 3 to 30 below actual costs and, thus, often significantly underestimate their true cycling costs. Knowledge of the actual, or total, cost of cycling will reduce power production costs by enabling utilities to more accurately dispatch their units to manage unit life expectancies, maintenance strategies and reliability. Utility management responses to these costs are presented and utility cost savings have been demonstrated. (orig.) 7 refs.

  11. Evaluation of environmental management cost estimating capabilities for the subject area ''Life-cycle economics for radioactive waste management and environmental remediation''

    International Nuclear Information System (INIS)

    Hombach, W.G.

    1995-01-01

    This paper provides a comprehensive perspective on the scope of Environmental Management (EM) activities and on the existing capability to estimate their costs. The scope is defined in terms of both activities and associated cost driving factors. The capability to estimate this scope was determined by evaluating existing cost estimating tools identified through a survey of the US Department of Energy (DOE), the US Department of Defense (DoD), the US Environmental Protection Agency, and private industry. This paper is largely based on the results of a report produced for the Office of the Secretary of Defense, US Department of Defense, entitled, Evaluation of Environmental Management Cost-Estimating Capabilities of Major Defense Acquisition Programs, March 22, 1995. The DoD sponsored report was designed to have a broad application relevant not only to DoD, but to other government agencies, and industry. In addition to DoD, it has particular application to DOE because significant portions of the analyses and data were derived from DOE environmental management databases, cost models, reports, and work breakdown structures. This paper provides the basis used and methodology employed to conduct an evaluations of selected EM cost estimating tools. The following topics are discussed: Life Cycle of EM Activities; Major Elements of EM Activities; Cost Tool Evaluation Matrix; Results of Cost Tool Evaluations; Cost Tool Development Plan

  12. Cost-benefit analysis on FBR cycle R and D for the world

    International Nuclear Information System (INIS)

    Kawasaki, Hirotsugu

    2006-01-01

    This analysis was estimated on the assumption that the nuclear power generation will be changed by FBR and both LWR and FBR indicate same nuclear power generation cost and the environmental load. The cost-benefit analysis results on FBR cycle R and D in the world showed that increase of power generation cost with increase of uranium fuel cost will be avoided and decrease of power generation cost by introducing FBR. The cost-benefit analysis results on FBR cycle R and D in Japan showed that about 9 billions yen will be obtained by the above two economic effects. Cost-benefit effects by introducing FBR, economic estimation method of cost-benefit effect, range and contents of cost-benefit effect on FBR R and D, preconditions of evaluation, and evaluation results are explained. (S.Y.)

  13. Los Alamos Waste Management Cost Estimation Model

    International Nuclear Information System (INIS)

    Matysiak, L.M.; Burns, M.L.

    1994-03-01

    This final report completes the Los Alamos Waste Management Cost Estimation Project, and includes the documentation of the waste management processes at Los Alamos National Laboratory (LANL) for hazardous, mixed, low-level radioactive solid and transuranic waste, development of the cost estimation model and a user reference manual. The ultimate goal of this effort was to develop an estimate of the life cycle costs for the aforementioned waste types. The Cost Estimation Model is a tool that can be used to calculate the costs of waste management at LANL for the aforementioned waste types, under several different scenarios. Each waste category at LANL is managed in a separate fashion, according to Department of Energy requirements and state and federal regulations. The cost of the waste management process for each waste category has not previously been well documented. In particular, the costs associated with the handling, treatment and storage of the waste have not been well understood. It is anticipated that greater knowledge of these costs will encourage waste generators at the Laboratory to apply waste minimization techniques to current operations. Expected benefits of waste minimization are a reduction in waste volume, decrease in liability and lower waste management costs

  14. Nuclear fuel cycle cost analysis using a probabilistic simulation technique

    International Nuclear Information System (INIS)

    Won, Il Ko; Jong, Won Choi; Chul, Hyung Kang; Jae, Sol Lee; Kun, Jai Lee

    1998-01-01

    A simple approach was described to incorporate the Monte Carlo simulation technique into a fuel cycle cost estimate. As a case study, the once-through and recycle fuel cycle options were tested with some alternatives (ie. the change of distribution type for input parameters), and the simulation results were compared with the values calculated by a deterministic method. A three-estimate approach was used for converting cost inputs into the statistical parameters of assumed probabilistic distributions. It was indicated that the Monte Carlo simulation by a Latin Hypercube Sampling technique and subsequent sensitivity analyses were useful for examining uncertainty propagation of fuel cycle costs, and could more efficiently provide information to decisions makers than a deterministic method. It was shown from the change of distribution types of input parameters that the values calculated by the deterministic method were set around a 40 th ∼ 50 th percentile of the output distribution function calculated by probabilistic simulation. Assuming lognormal distribution of inputs, however, the values calculated by the deterministic method were set around an 85 th percentile of the output distribution function calculated by probabilistic simulation. It was also indicated from the results of the sensitivity analysis that the front-end components were generally more sensitive than the back-end components, of which the uranium purchase cost was the most important factor of all. It showed, also, that the discount rate made many contributions to the fuel cycle cost, showing the rank of third or fifth of all components. The results of this study could be useful in applications to another options, such as the Dcp (Direct Use of PWR spent fuel In Candu reactors) cycle with high cost uncertainty

  15. Parametric Cost Estimates for an International Competitive Edge

    International Nuclear Information System (INIS)

    Murphy, L.T.; Hickey, M.

    2006-01-01

    This paper summarizes the progress to date by CH2M HILL and the UKAEA in development of a parametric modelling capability for estimating the costs of large nuclear decommissioning projects in the United Kingdom (UK) and Europe. The ability to successfully apply parametric cost estimating techniques will be a key factor to commercial success in the UK and European multi-billion dollar waste management, decommissioning and environmental restoration markets. The most useful parametric models will be those that incorporate individual components representing major elements of work: reactor decommissioning, fuel cycle facility decommissioning, waste management facility decommissioning and environmental restoration. Models must be sufficiently robust to estimate indirect costs and overheads, permit pricing analysis and adjustment, and accommodate the intricacies of international monetary exchange, currency fluctuations and contingency. The development of a parametric cost estimating capability is also a key component in building a forward estimating strategy. The forward estimating strategy will enable the preparation of accurate and cost-effective out-year estimates, even when work scope is poorly defined or as yet indeterminate. Preparation of cost estimates for work outside the organizations current sites, for which detailed measurement is not possible and historical cost data does not exist, will also be facilitated. (authors)

  16. [Fuel Rod Consolidation Project]: The estimated total life cycle cost for the 30-year operation of prototypical consolidation demonstration equipment: Volume 4, Phase 2

    International Nuclear Information System (INIS)

    1987-01-01

    The Total Life Cycle Costs have been developed for the construction, operation and decommissioning of a single line of hot-cell-enclosed production consolidation equipment operating on spent fuel at the rate of 750 MTU/year for 30 years. The cost estimate is for a single production line that is part of an overall facility at either a Monitored Retrievable Storage or a Repository facility. This overall facility would include other capabilities and possibly other consolidation lines. However, no costs were included in the cost estimate for other portions of the plant, except that staff costs include an overhead charge that reflects the overhead support services in an overall facility

  17. Estimating Externalities of Hydro Fuel Cycles, Report 6

    Energy Technology Data Exchange (ETDEWEB)

    Barnthouse, L.W.; Cada, G.F.; Cheng, M.-D.; Easterly, C.E.; Kroodsma, R.L.; Lee, R.; Shriner, D.S.; Tolbert, V.R.; Turner, R.S.

    1994-12-01

    There are three major objectives of this hydropower study: (1) to implement the methodological concepts that were developed in the background document (ORNL/RFF 1992) as a means of estimating the external costs and benefits of fuel cycles and, by so doing, to demonstrate their application to the hydroelectric fuel cycle (different fuel cycles have unique characteristics that need to be addressed in different ways); (2) to develop, given the time and resources, the best range of estimates of externalities associated with hydroelectric projects, using two benchmark projects at two reference sites in the US; and (3) to assess the state of the information that is available to support the estimation of externalities associated with the hydroelectric fuel cycle and, by so doing, to assist in identifying gaps in knowledge and in setting future research agendas. The main consideration in defining these objectives was a desire to have more information about externalities and a better method for estimating them. As set forth in the agreement between the US and the EC, the study is explicitly and intentionally not directed at any one audience. This study is about a methodology for estimating externalities. It is not about how to use estimates of externalities in a particular policy context.

  18. Cost estimation of the decommissioning of nuclear fuel cycle plants

    International Nuclear Information System (INIS)

    Barbe, A.; Pech, R.

    1991-01-01

    Most studies conducted to date on the cost of decommissioning nuclear facilities pertain to reactors. Few such studies have been performed on the cost of decommissioning nuclear fuel cycle plants, particularly spent fuel reprocessing plants. Present operators of these plants nevertheless need to assess such costs, at least in order to include the related expenses in their short-, medium- or long-term projections. They also need to determine now, for example, suitable production costs that the plant owners will have to propose to their customers. Unlike nuclear reactors for which a series effect is involved (PWRs, BWRs, etc.) and where radioactivity is relatively concentrated, industrial-scale reprocessing plants are large, complex installations for which decommissioning is a long and costly operation that requires a special approach. Faced with this problem, Cogema, the owner and operator of the La Hague and Marcoule reprocessing plants in France, called on SGN to assess the total decommissioning costs for its plants. This assessment led SGN to development by SGN engineers of a novel methodology and a computerized calculation model described below. The resulting methodology and model are applicable to other complex nuclear facilities besides reprocessing plants, such as laboratories and nuclear auxiliaries of reactor cores. (author)

  19. Estimating and understanding DOE waste management costs'

    International Nuclear Information System (INIS)

    Kang, J.S.; Sherick, M.J.

    1995-01-01

    This paper examines costs associated with cleaning up the US Department of Energy's (DOE's) nuclear facilities, with particular emphasis on the waste management program. Life-cycle waste management costs have been compiled and reported in the DOE Baseline Environmental Management Report (BEMR). Waste management costs are a critical issue for DOE because of the current budget constraints. The DOE sites are struggling to accomplish their environmental management objectives given funding scenarios that are well below anticipated waste management costs. Through the BEMR process, DOE has compiled complex-wide cleanup cost estimates and has begun analysis of these costs with respect to alternative waste management scenarios and policy strategies. From this analysis, DOE is attempting to identify the major cost drivers and prioritize environmental management activities to achieve maximum utilization of existing funding. This paper provides an overview of the methodology DOE has used to estimate and analyze some waste management costs, including the key data requirements and uncertainties

  20. 10 CFR 436.19 - Life cycle costs.

    Science.gov (United States)

    2010-01-01

    ... operation and maintenance costs: (c) Replacement costs less salvage costs of replaced building systems; and... 10 Energy 3 2010-01-01 2010-01-01 false Life cycle costs. 436.19 Section 436.19 Energy DEPARTMENT... Procedures for Life Cycle Cost Analyses § 436.19 Life cycle costs. Life cycle costs are the sum of the...

  1. Life-cycle cost assessment of seismically base-isolated structures in nuclear power plants

    International Nuclear Information System (INIS)

    Wang, Hao; Weng, Dagen; Lu, Xilin; Lu, Liang

    2013-01-01

    Highlights: • The life-cycle cost of seismic base-isolated nuclear power plants is modeled. • The change law of life-cycle cost with seismic fortification intensity is studied. • The initial cost of laminated lead rubber bearings can be expressed as the function of volume. • The initial cost of a damper can be expressed as the function of its maximum displacement and tonnage. • The use of base-isolation can greatly reduce the expected damage cost, which leads to the reduction of the life-cycle cost. -- Abstract: Evaluation of seismically base-isolated structural life-cycle cost is the key problem in performance based seismic design. A method is being introduced to address the life-cycle cost of base-isolated reinforced concrete structures in nuclear power plants. Each composition of life-cycle cost is analyzed including the initial construction cost, the isolators cost and the excepted damage cost over life-cycle of the structure. The concept of seismic intensity is being used to estimate the expected damage cost, greatly simplifying the calculation. Moreover, French Cruas nuclear power plant is employed as an example to assess its life-cycle cost, compared to the cost of non-isolated plant at the same time. The results show that the proposed method is efficient and the expected damage cost is enormously reduced because of the application of isolators, which leads to the reduction of the life-cycle cost of nuclear power plants

  2. Comparative life-cycle cost analysis for low-level mixed waste remediation alternatives

    International Nuclear Information System (INIS)

    Jackson, J.A.; White, T.P.; Kloeber, J.M.; Toland, R.J.; Cain, J.P.; Buitrago, D.Y.

    1995-03-01

    The purpose of this study is two-fold: (1) to develop a generic, life-cycle cost model for evaluating low-level, mixed waste remediation alternatives, and (2) to apply the model specifically, to estimate remediation costs for a site similar to the Fernald Environmental Management Project near Cincinnati, OH. Life-cycle costs for vitrification, cementation, and dry removal process technologies are estimated. Since vitrification is in a conceptual phase, computer simulation is used to help characterize the support infrastructure of a large scale vitrification plant. Cost estimating relationships obtained from the simulation data, previous cost estimates, available process data, engineering judgment, and expert opinion all provide input to an Excel based spreadsheet for generating cash flow streams. Crystal Ball, an Excel add-on, was used for discounting cash flows for net present value analysis. The resulting LCC data was then analyzed using multi-attribute decision analysis techniques with cost and remediation time as criteria. The analytical framework presented allows alternatives to be evaluated in the context of budgetary, social, and political considerations. In general, the longer the remediation takes, the lower the net present value of the process. This is true because of the time value of money and large percentage of the costs attributed to storage or disposal

  3. Life-cycle cost analysis of adsorption cycles for desalination

    KAUST Repository

    Thu, Kyaw

    2010-08-01

    This paper presents the thermo-economic analysis of the adsorption desalination (AD) cycle that is driven by low-temperature waste heat from exhaust of industrial processes or renewable sources. The AD cycle uses an adsorbent such as the silica gel to desalt the sea or brackish water. Based on an experimental prototype AD plant, the life-cycle cost analysis of AD plants of assorted water production capacities has been simulated and these predictions are translated into unit cost of water production. Our results show that the specific energy consumption of the AD cycle is 1.38 kWh/m3 which is the lowest ever reported. For a plant capacity of 1000 m3/d, the AD cycle offers a unit cost of $0.457/m3 as compared to more than $0.9 for the average RO plants. Besides being cost-effective, the AD cycle is also environment-friendly as it emits less CO2 emission per m3 generated, typically 85% less, by comparison to an RO process. © 2010 Desalination Publications.

  4. Estimated generic prices of cancer medicines deemed cost-ineffective in England: a cost estimation analysis.

    Science.gov (United States)

    Hill, Andrew; Redd, Christopher; Gotham, Dzintars; Erbacher, Isabelle; Meldrum, Jonathan; Harada, Ryo

    2017-01-20

    The aim of this study was to estimate lowest possible treatment costs for four novel cancer drugs, hypothesising that generic manufacturing could significantly reduce treatment costs. This research was carried out in a non-clinical research setting using secondary data. There were no human participants in the study. Four drugs were selected for the study: bortezomib, dasatinib, everolimus and gefitinib. These medications were selected according to their clinical importance, novel pharmaceutical actions and the availability of generic price data. Target costs for treatment were to be generated for each indication for each treatment. The primary outcome measure was the target cost according to a production cost calculation algorithm. The secondary outcome measure was the target cost as the lowest available generic price; this was necessary where export data were not available to generate an estimate from our cost calculation algorithm. Other outcomes included patent expiry dates and total eligible treatment populations. Target prices were £411 per cycle for bortezomib, £9 per month for dasatinib, £852 per month for everolimus and £10 per month for gefitinib. Compared with current list prices in England, these target prices would represent reductions of 74-99.6%. Patent expiry dates were bortezomib 2014-22, dasatinib 2020-26, everolimus 2019-25 and gefitinib 2017. The total global eligible treatment population in 1 year is 769 736. Our findings demonstrate that affordable drug treatment costs are possible for novel cancer drugs, suggesting that new therapeutic options can be made available to patients and doctors worldwide. Assessing treatment cost estimations alongside cost-effectiveness evaluations is an important area of future research. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  5. A level playing field: Obtaining consistent cost estimates for advanced reactor designs

    International Nuclear Information System (INIS)

    Hudson, C.R. II; Rohm, H.H.; Humphreys, J.R. Jr.

    1987-01-01

    Rules and guidelines for developing cost estimates are given which provide a means for presenting cost estimates for advanced concepts on a consistent and equitable basis. For advanced reactor designs, the scope of a cost estimate includes the plant capital cost, the operating and maintenance cost, the fuel cycle cost, and the cost of decommissioning. Each element is subdivided as is necessary to provide a common reporting format for all power plant concepts. The total generation cost is taken to be a suitable choice for a summary figure of merit. To test the application of the rules and guidelines as well as developing reference costs for current technologies, several different sized coal and pressurized water reactor plant cost estimates have been prepared

  6. Estimating the cost of disposal for Canada's nuclear fuel waste

    International Nuclear Information System (INIS)

    Ates, Y.

    1996-07-01

    Atomic Energy of Canada Ltd (AECL) prepared an Environmental Impact Statement and nine supporting Primary Reference Documents on the concept for disposal of Canada's nuclear fuel waste. This report summarizes the basis of the cost estimate which is provided in the primary reference document on engineering for a disposal facility. The scope of the cost estimate is explained by describing the key features of the disposal facility design, by noting the major assumptions made in preparing the estimates, and by listing the included and excluded cost components. An activity-based project planning and control method is explained whereby the project schedule, costs, and personnel requirements are interlinked; forming an integrated perspective on the total project life cycle. The summary and distribution of costs in each project stage by major facility or activity are presented. The results of studies which reviewed the overall cost estimate are also described. These studies indicate that, within the scope, the estimate is reasonable and compares well with similar international studies. (author)

  7. Integrating Life-cycle Assessment into Transport Cost-benefit Analysis

    DEFF Research Database (Denmark)

    Manzo, Stefano; Salling, Kim Bang

    2016-01-01

    Traditional transport Cost-Benefit Analysis (CBA) commonly ignores the indirect environmental impacts of an infrastructure project deriving from the overall life-cycle of the different project components. Such indirect impacts are instead of key importance in order to assess the long......-term sustainability of a transport infrastructure project. In the present study we suggest to overcome this limit by combining a conventional life-cycle assessment approach with standard transport cost-benefit analysis. The suggested methodology is tested upon a case study project related to the construction of a new...... fixed link across the Roskilde fjord in Frederikssund (Denmark). The results are then compared with those from a standard CBA framework. The analysis shows that indirect environmental impacts represent a relevant share of the estimated costs of the project, clearly affecting the final project evaluation...

  8. Fuel cycle model and the cost of a recycling thorium in the CANDU reactor

    International Nuclear Information System (INIS)

    Choi, Hangbok; Park, Chang Je

    2005-01-01

    The dry process fuel technology has a high proliferation-resistance, which allows applications not only to the existing but also to the future nuclear fuel cycle systems. In this study, the homogeneous ThO 2 -UO 2 recycling fuel cycle in a Canada deuterium uranium (CANDU) reactor was assessed for a fuel cycle cost evaluation. A series of parametric calculations were performed for the uranium fraction, enrichment of the initial uranium fuel, and the fission product removal rated of the recycled fuel. The fuel cycle cost was estimated by the levelized lifetime cost model provided by the Organization for Economic Cooperation and Development/Nuclear Energy Agency. Though it is feasible to recycle the homogeneous ThO 2 -UO 2 fuel in the CANDU reactor from the viewpoint of a mass balance, the recycling fuel cycle cost is much higher than the conventional natural uranium fuel cycle cost for most cases due to the high fuel fabrication cost. (author)

  9. Cost estimates and economic evaluations for conceptual LLRW disposal facility designs

    Energy Technology Data Exchange (ETDEWEB)

    Baird, R.D.; Chau, N. [Rogers & Associates Engineering Corp., Salt Lake City, UT (United States); Breeds, C.D. [SubTerra, Inc., Redmond, WA (United States)

    1995-12-31

    Total life-cycle costs were estimated in support of the New York LLRW Siting Commission`s project to select a disposal method from four near-surface LLRW disposal methods (namely, uncovered above-grade vaults, covered above-grade vaults, below-grade vaults, and augered holes) and two mined methods (namely, vertical shaft mines and drift mines). Conceptual designs for the disposal methods were prepared and used as the basis for the cost estimates. Typical economic performance of each disposal method was assessed. Life-cycle costs expressed in 1994 dollars ranged from $ 1,100 million (for below-grade vaults and both mined disposal methods) to $2,000 million (for augered holes). Present values ranged from $620 million (for below-grade vaults) to $ 1,100 million (for augered holes).

  10. Estimating Externalities of Coal Fuel Cycles, Report 3

    Energy Technology Data Exchange (ETDEWEB)

    Barnthouse, L.W.; Cada, G.F.; Cheng, M.-D.; Easterly, C.E.; Kroodsma, R.L.; Lee, R.; Shriner, D.S.; Tolbert, V.R.; Turner, R.S.

    1994-09-01

    The agreement between the US DOE and the EC established the specific objectives of the study: (a) to develop a methodological framework that uses existing data and models to quantify the external costs and benefits of energy; (b) to demonstrate the application of the framework to estimate the externalities of the coal, biomass, oil, natural gas, hydro, nuclear, photovoltaic, and wind fuel cycles (by agreement with the EC, the US addressed the first six of these); and (c) to identify major gaps in the availability of information to quantify impacts, damages, benefits, and externalities of fuel cycles; and to suggest priorities for future research. The main consideration in defining these objectives was a desire to have more information about externalities, and a better method for estimating them.

  11. Fuel cycle cost uncertainty from nuclear fuel cycle comparison

    International Nuclear Information System (INIS)

    Li, J.; McNelis, D.; Yim, M.S.

    2013-01-01

    This paper examined the uncertainty in fuel cycle cost (FCC) calculation by considering both model and parameter uncertainty. Four different fuel cycle options were compared in the analysis including the once-through cycle (OT), the DUPIC cycle, the MOX cycle and a closed fuel cycle with fast reactors (FR). The model uncertainty was addressed by using three different FCC modeling approaches with and without the time value of money consideration. The relative ratios of FCC in comparison to OT did not change much by using different modeling approaches. This observation was consistent with the results of the sensitivity study for the discount rate. Two different sets of data with uncertainty range of unit costs were used to address the parameter uncertainty of the FCC calculation. The sensitivity study showed that the dominating contributor to the total variance of FCC is the uranium price. In general, the FCC of OT was found to be the lowest followed by FR, MOX, and DUPIC. But depending on the uranium price, the FR cycle was found to have lower FCC over OT. The reprocessing cost was also found to have a major impact on FCC

  12. Preliminary estimates of the total-system cost for the restructured program: An addendum to the May 1989 analysis of the total-system life cycle cost for the Civilian Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    1990-12-01

    The total-system life-cycle cost (TSLCC) analysis for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program is an ongoing activity that helps determine whether the revenue-producing mechanism established by the Nuclear Waste Policy Act of 1982 - a fee levied on electricity generated and sold by commercial nuclear power plants - is sufficient to cover the cost of the program. This report provides cost estimates for the sixth annual evaluation of the adequacy of the fee. The costs contained in this report represent a preliminary analysis of the cost impacts associated with the Secretary of Energy's Report to Congress on Reassessment of the Civilian Radioactive Waste Management Program issued in November 1989. The major elements of the restructured program announced in this report which pertain to the program's life-cycle costs are: a prioritization of the scientific investigations program at the Yucca Mountain candidate site to focus on identification of potentially adverse conditions, a delay in the start of repository operations until 2010, the start of limited waste acceptance at the monitored retrievable storage (MRS) facility in 1998, and the start of waste acceptance at the full-capability MRS facility in 2,000. Based on the restructured program, the total-system cost for the system with a repository at the candidate site at Yucca Mountain in Nevada, a facility for monitored retrievable storage (MRS), and a transportation system is estimated at $26 billion (expressed in constant 1988 dollars). In the event that a second repository is required and is authorized by the Congress, the total-system cost is estimated at $34 to $35 billion, depending on the quantity of spent fuel and high-level waste (HLW) requiring disposal. 17 figs., 17 tabs

  13. Life-Cycle Cost-Benefit Analysis

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    2010-01-01

    The future use of Life-Cycle Cost-Benefit (LCCB) analysis is discussed in this paper. A more complete analysis including not only the traditional factors and user costs, but also factors which are difficult to include in the analysis is needed in the future.......The future use of Life-Cycle Cost-Benefit (LCCB) analysis is discussed in this paper. A more complete analysis including not only the traditional factors and user costs, but also factors which are difficult to include in the analysis is needed in the future....

  14. Social Cost Assessment for Nuclear Fuel Cycle Options in the Republic of Korea

    Energy Technology Data Exchange (ETDEWEB)

    Joo, Ji-eun; Yim, Man-Sung [KAIST, Daejeon (Korea, Republic of)

    2016-10-15

    This paper will investigate the vast array of economic factors to estimate the true cost of the nuclear power. There are many studies addressing the external costs of energy production. However, it is only since the 1990s that the external costs of nuclear powered electricity production has been studied in detail. Each investigation has identified their own set of external costs and developed formulas and models using a variety of statistical techniques. The objective of this research is to broaden the scope of the parameters currently consider by adding new areas and expanding on the types of situations considered. Previously the approach to evaluating the external cost of nuclear power did not include various fuel cycle options and influencing parameters. Cost has always been a very important factor in decision-making, in particular for policy choices evaluating the alternative energy sources and electricity generation technologies. Assessment of external costs in support of decision-making should reflect timely consideration of important country specific policy objective. PWR-MOX and FR-Pyro are the best fuel cycle in parameter of environment impacts, but OT or OT-ER is proper than FR-Pyro in human beings. Using the OT fuel cycle is better than FR-Pyro to reduce the conflict cost. When energy supply is deficient, FR-Pyro fuel cycle stands longer than other fuel cycles. Proliferation resistance is shown as 'high' in all fuel cycles, so there are no difference between fuel cycles. When the severe accident occurs, FR-Pyro cycle is economical than other OT based fuel cycles.

  15. Impacts of nuclear fuel cycle costs on nuclear power generating costs

    International Nuclear Information System (INIS)

    Bertel, E.; Naudet, G.

    1989-01-01

    Fuel cycle costs are one of the main parameters to evaluate the competitiveness of various nuclear strategies. The historical analysis based on the French case shows the good performances yet achieved in mastering elementary costs in order to limit global fuel cycle cost escalation. Two contrasted theoretical scenarios of costs evolution in the middle and long term have been determined, based upon market analysis and technological improvements expected. They are used to calculate the global fuel cycle costs for various fuel management options and for three strategies of nuclear deployment. The results illustrate the stability of the expected fuel cycle costs over the long term, to be compared to the high incertainty prevailing for fossil fueled plants. The economic advantages of advanced technologies such as MOX fueled PWRs are underlined

  16. Cost estimation tools in Germany and the UK. Comparison of cost estimates and actual costs

    International Nuclear Information System (INIS)

    Pfeifer, W.; Gordelier, S.; Drake, V.

    2005-01-01

    Full text: Accurate cost estimation for future decommissioning projects is a matter of considerable importance, especially for ensuring that sufficient funds will be available at the time of project implementation. This paper looks at the experience of cost estimation and real implementation outcomes from two countries, Germany and the UK, and draws lessons for the future. In Germany, cost estimates for the decommissioning of power reactors are updated every two years. For this purpose, the STILLKO program of the NIS Company is used. So far, Forschungszentrum Karlsruhe has successfully decommissioned two prototype reactor facilities. Re-cultivation of the premises has already been completed. At the moment, the activated components of the multi-purpose research reactor (MZFR), the first pressurized water reactor in Germany that was moderated and cooled with heavy water, and of the prototype fast breeder reactor (KNK) are being dismantled remotely. Consequently, vast experience exists in particular for the updating of total costs on the basis of actually incurred expenses. The further the dismantling work proceeds, the more reliable is the total cost estimate. Here, the development of the estimated MZFR decommissioning costs shall be presented and compared with the estimates obtained for a German reference PWR-type power reactor of 1200 MW. In this way: - common features of the prototype reactor and power reactor shall be emphasized, - several parameters leading to an increase in the estimated costs shall be highlighted, - cost risks shall be outlined with the remote dismantling of the reactor pressure vessel serving as an example, - calculation parameters shall be presented, and - recommendations shall be made for a consistent estimation of costs. The United Kingdom Atomic Energy Authority (UKAEA) has a major programme for the environmental remediation of its former research and development sites at Dounreay, Windscale, Harwell and Winfrith together with the need to

  17. Nuclear fuel cycle cost and cost calculation

    International Nuclear Information System (INIS)

    Schmiedel, P.; Schricker, W.

    1975-01-01

    Four different methods of calculating the cost of the fuel cycle are explained, starting from the individual cost components with their specific input data. The results (for LWRs) are presented in tabular form and in the form of diagrams. (RB) [de

  18. Study on the fuel cycle cost of gas turbine high temperature reactor (GTHTR300). Contract research

    Energy Technology Data Exchange (ETDEWEB)

    Takei, Masanobu; Katanishi, Shoji; Nakata, Tetsuo; Kunitomi, Kazuhiko [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment; Oda, Takefumi; Izumiya, Toru [Nuclear Fuel Industries, Ltd., Tokyo (Japan)

    2002-11-01

    In the basic design of gas turbine high temperature reactor (GTHTR300), reduction of the fuel cycle cost has a large benefit of improving overall plant economy. Then, fuel cycle cost was evaluated for GTHTR300. First, of fuel fabrication for high-temperature gas cooled reactor, since there was no actual experience with a commercial scale, a preliminary design for a fuel fabrication plant with annual processing of 7.7 ton-U sufficient four GTHTR300 was performed, and fuel fabrication cost was evaluated. Second, fuel cycle cost was evaluated based on the equilibrium cycle of GTHTR300. The factors which were considered in this cost evaluation include uranium price, conversion, enrichment, fabrication, storage of spent fuel, reprocessing, and waste disposal. The fuel cycle cost of GTHTR300 was estimated at about 1.07 yen/kWh. If the back-end cost of reprocessing and waste disposal is included and assumed to be nearly equivalent to LWR, the fuel cycle cost of GTHTR300 was estimated to be about 1.31 yen/kWh. Furthermore, the effects on fuel fabrication cost by such of fuel specification parameters as enrichment, the number of fuel types, and the layer thickness were considered. Even if the enrichment varies from 10 to 20%, the number of fuel types change from 1 to 4, the 1st layer thickness of fuel changes by 30 {mu}m, or the 2nd layer to the 4th layer thickness of fuel changes by 10 {mu}m, the impact on fuel fabrication cost was evaluated to be negligible. (author)

  19. Well-founded cost estimation validated by experience

    International Nuclear Information System (INIS)

    LaGuardia, T.S.

    2005-01-01

    to build consistency into its cost estimates. A standardized list of decommissioning activities needs to be adopted internationally so estimates can be prepared on a consistent basis, and to facilitate tracking of actual costs against the estimate. The OECD/NEA Standardized List incorporates the consensus of international experts as to the elements of cost and activities that should be included in the estimate. A significant effort was made several years ago to promote universal adoption of this standard. Using the standardized list of activities as a template, a questionnaire was distributed to gather actual decommissioning costs (and other parameters) from international projects. The results of cost estimate contributions from many countries were analyzed and evaluated as to reactor types, decommissioning strategies, cost drivers, and waste disposal quantities. The results were reported in the literature A standardized list of activities will only be valuable if the underlying cost elements and methodology is clearly identified in the estimate. While no one would expect perfect correlation of every element of cost in a large project estimate versus actual cost comparison, the variants should be visible so the basis for the difference can be examined and evaluated. For the nuclear power industry to grow to meet the increasing demand for electricity, the investors, regulators and the public must understand the total cost of the nuclear fuel cycle. The costs for decommissioning and the funding requirements to provide for safe closure and dismantling of these units are well recognized to represent a significant liability to the owner utilities and governmental agencies. Owners and government regulatory agencies need benchmarked decommissioning costs to test the validity of each proposed cost and funding request. The benchmarking process requires the oversight of decommissioning experts to evaluate contributed cost data in a meaningful manner. An international

  20. Stochastic renewal process models for estimation of damage cost over the life-cycle of a structure

    NARCIS (Netherlands)

    Pandey, Mahesh D.; van der Weide, J.A.M.

    2017-01-01

    In the life-cycle cost analysis of a structure, the total cost of damage caused by external hazards like earthquakes, wind storms and flood is an important but highly uncertain component. In the literature, the expected damage cost is typically analyzed under the assumption of either the

  1. Explicit formulas for the variance of discounted life-cycle cost

    International Nuclear Information System (INIS)

    Noortwijk, Jan M. van

    2003-01-01

    In life-cycle costing analyses, optimal design is usually achieved by minimising the expected value of the discounted costs. As well as the expected value, the corresponding variance may be useful for estimating, for example, the uncertainty bounds of the calculated discounted costs. However, general explicit formulas for calculating the variance of the discounted costs over an unbounded time horizon are not yet available. In this paper, explicit formulas for this variance are presented. They can be easily implemented in software to optimise structural design and maintenance management. The use of the mathematical results is illustrated with some examples

  2. Externality costs of the coal-fuel cycle: The case of Kusile Power Station

    Directory of Open Access Journals (Sweden)

    Nonophile P. Nkambule

    2017-09-01

    Full Text Available Coal-based electricity is an integral part of daily life in South Africa and globally. However, the use of coal for electricity generation carries a heavy cost for social and ecological systems that goes far beyond the price we pay for electricity. We developed a model based on a system dynamics approach for understanding the measurable and quantifiable coal-fuel cycle burdens and externality costs, over the lifespan of a supercritical coal-fired power station that is fitted with a flue-gas desulfurisation device (i.e. Kusile Power Station. The total coal-fuel cycle externality cost on both the environment and humans over Kusile's lifespan was estimated at ZAR1 449.9 billion to ZAR3 279 billion or 91c/kWh to 205c/kWh sent out (baseline: ZAR2 172.7 billion or 136c/kWh. Accounting for the life-cycle burdens and damages of coal-derived electricity conservatively, doubles to quadruples the price of electricity, making renewable energy sources such as wind and solar attractive alternatives. Significance: The use of coal for electricity generation carries a heavy cost for social and ecological systems that goes far beyond the price we pay for electricity. The estimation of social costs is particularly important to the electric sector because of non-differentiation of electricity prices produced from a variety of sources with potentially very dissimilar environmental and human health costs. Because all electricity generation technologies are associated with undesirable side effects in their fuelcycle and lifespan, comprehensive comparative analyses of life-cycle costs of all power generation technologies is indispensable to guide the development of future energy policies in South Africa.

  3. Hydrogen Station Cost Estimates: Comparing Hydrogen Station Cost Calculator Results with other Recent Estimates

    Energy Technology Data Exchange (ETDEWEB)

    Melaina, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Penev, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-09-01

    This report compares hydrogen station cost estimates conveyed by expert stakeholders through the Hydrogen Station Cost Calculation (HSCC) to a select number of other cost estimates. These other cost estimates include projections based upon cost models and costs associated with recently funded stations.

  4. New Approaches in Reuseable Booster System Life Cycle Cost Modeling

    Science.gov (United States)

    Zapata, Edgar

    2013-01-01

    This paper presents the results of a 2012 life cycle cost (LCC) study of hybrid Reusable Booster Systems (RBS) conducted by NASA Kennedy Space Center (KSC) and the Air Force Research Laboratory (AFRL). The work included the creation of a new cost estimating model and an LCC analysis, building on past work where applicable, but emphasizing the integration of new approaches in life cycle cost estimation. Specifically, the inclusion of industry processes/practices and indirect costs were a new and significant part of the analysis. The focus of LCC estimation has traditionally been from the perspective of technology, design characteristics, and related factors such as reliability. Technology has informed the cost related support to decision makers interested in risk and budget insight. This traditional emphasis on technology occurs even though it is well established that complex aerospace systems costs are mostly about indirect costs, with likely only partial influence in these indirect costs being due to the more visible technology products. Organizational considerations, processes/practices, and indirect costs are traditionally derived ("wrapped") only by relationship to tangible product characteristics. This traditional approach works well as long as it is understood that no significant changes, and by relation no significant improvements, are being pursued in the area of either the government acquisition or industry?s indirect costs. In this sense then, most launch systems cost models ignore most costs. The alternative was implemented in this LCC study, whereby the approach considered technology and process/practices in balance, with as much detail for one as the other. This RBS LCC study has avoided point-designs, for now, instead emphasizing exploring the trade-space of potential technology advances joined with potential process/practice advances. Given the range of decisions, and all their combinations, it was necessary to create a model of the original model

  5. New Approaches in Reusable Booster System Life Cycle Cost Modeling

    Science.gov (United States)

    Zapata, Edgar

    2013-01-01

    This paper presents the results of a 2012 life cycle cost (LCC) study of hybrid Reusable Booster Systems (RBS) conducted by NASA Kennedy Space Center (KSC) and the Air Force Research Laboratory (AFRL). The work included the creation of a new cost estimating model and an LCC analysis, building on past work where applicable, but emphasizing the integration of new approaches in life cycle cost estimation. Specifically, the inclusion of industry processes/practices and indirect costs were a new and significant part of the analysis. The focus of LCC estimation has traditionally been from the perspective of technology, design characteristics, and related factors such as reliability. Technology has informed the cost related support to decision makers interested in risk and budget insight. This traditional emphasis on technology occurs even though it is well established that complex aerospace systems costs are mostly about indirect costs, with likely only partial influence in these indirect costs being due to the more visible technology products. Organizational considerations, processes/practices, and indirect costs are traditionally derived ("wrapped") only by relationship to tangible product characteristics. This traditional approach works well as long as it is understood that no significant changes, and by relation no significant improvements, are being pursued in the area of either the government acquisition or industry?s indirect costs. In this sense then, most launch systems cost models ignore most costs. The alternative was implemented in this LCC study, whereby the approach considered technology and process/practices in balance, with as much detail for one as the other. This RBS LCC study has avoided point-designs, for now, instead emphasizing exploring the trade-space of potential technology advances joined with potential process/practice advances. Given the range of decisions, and all their combinations, it was necessary to create a model of the original model

  6. Total life cycle cost model for electric power stations

    International Nuclear Information System (INIS)

    Cardullo, M.W.

    1995-01-01

    The Total Life Cycle Cost (TLCC) model for electric power stations was developed to provide a technology screening model. The TLCC analysis involves normalizing cost estimates with respect to performance standards and financial assumptions and preparing a profile of all costs over the service life of the power station. These costs when levelized present a value in terms of a utility electricity rate. Comparison of cost and the pricing of the electricity for a utility shows if a valid project exists. Cost components include both internal and external costs. Internal costs are direct costs associated with the purchase, and operation of the power station and include initial capital costs, operating and maintenance costs. External costs result from societal and/or environmental impacts that are external to the marketplace and can include air quality impacts due to emissions, infrastructure costs, and other impacts. The cost stream is summed (current dollars) or discounted (constant dollars) to some base year to yield a overall TLCC of each power station technology on a common basis. While minimizing life cycle cost is an important consideration, it may not always be a preferred method for some utilities who may prefer minimizing capital costs. Such consideration does not always result in technology penetration in a marketplace such as the utility sector. Under various regulatory climates, the utility is likely to heavily weigh initial capital costs while giving limited consideration to other costs such as societal costs. Policy makers considering external costs, such as those resulting from environmental impacts, may reach significantly different conclusions about which technologies are most advantageous to society. The TLCC analysis model for power stations was developed to facilitate consideration of all perspectives

  7. Nuclear-fuel-cycle costs. Consolidated Fuel-Reprocessing Program

    International Nuclear Information System (INIS)

    Burch, W.D.; Haire, M.J.; Rainey, R.H.

    1981-01-01

    The costs for the back-end of the nuclear fuel cycle, which were developed as part of the Nonproliferation Alternative Systems Assessment Program (NASAP), are presented. Total fuel-cycle costs are given for the pressurized-water reactor once-through and fuel-recycle systems, and for the liquid-metal fast-breeder-reactor system. These calculations show that fuel-cycle costs are a small part of the total power costs. For breeder reactors, fuel-cycle costs are about half that of the present once-through system. The total power cost of the breeder-reactor system is greater than that of light-water reactor at today's prices for uranium and enrichment

  8. Fuel cycle costs for molten-salt reactors

    International Nuclear Information System (INIS)

    Nagashima, Kikusaburo

    1983-01-01

    This report describes FCC (fuel cycle cost) estimates for MSCR (molten-salt converter reactor) and MSBR (molten-salt breeder reactor) compared with those for LWRs (PWR and BWR). The calculation is based on the present worth technique with a given discount rate for each cost item, which enables us to make comparison between FCC's for MSCR, MSBR and LWRs. As far as the computational results obtained here are concerned, shown that the FCC's for MSCR and MSBR are 70 -- 60 % lower than the values for LWRs. And it could be said that the FCC for MSCR (Pu-converter) is about 10 % lower than that for MSBR, because of the smaller amount of fissile inventory of MSCR than the inventory of MSBR. (author)

  9. Cost function estimation

    DEFF Research Database (Denmark)

    Andersen, C K; Andersen, K; Kragh-Sørensen, P

    2000-01-01

    on these criteria, a two-part model was chosen. In this model, the probability of incurring any costs was estimated using a logistic regression, while the level of the costs was estimated in the second part of the model. The choice of model had a substantial impact on the predicted health care costs, e...

  10. Surplus Cost Potential as a Life Cycle Impact Indicator for Metal Extraction

    Directory of Open Access Journals (Sweden)

    Marisa D.M. Vieira

    2016-01-01

    Full Text Available In the evaluation of product life cycles, methods to assess the increase in scarcity of resources are still under development. Indicators that can express the importance of an increase in scarcity of metals extracted include surplus ore produced, surplus energy required, and surplus costs in the mining and the milling stage. Particularly the quantification of surplus costs per unit of metal extracted as an indicator is still in an early stage of development. Here, we developed a method that quantifies the surplus cost potential of mining and milling activities per unit of metal extracted, fully accounting for mine-specific differences in costs. The surplus cost potential indicator is calculated as the average cost increase resulting from all future metal extractions, as quantified via cumulative cost-tonnage relationships. We tested the calculation procedure with 12 metals and platinum-group metals as a separate group. We found that the surplus costs range six orders of magnitude between the metals included, i.e., between $0.01–$0.02 (iron and $13,533–$17,098 (rhodium USD (year 2013 per kilogram of metal extracted. The choice of the reserve estimate (reserves vs. ultimate recoverable resource influenced the surplus costs only to a limited extent, i.e., between a factor of 0.7 and 3.2 for the metals included. Our results provide a good basis to regularly include surplus cost estimates as resource scarcity indicator in life cycle assessment.

  11. ESTIMATION OF LONG-TERM INVESTMENT PROJECTS WITH ENERGY-EFFICIENT SOLUTIONS BASED ON LIFE CYCLE COSTS INDICATOR

    Directory of Open Access Journals (Sweden)

    Bazhenov Viktor Ivanovich

    2015-09-01

    Full Text Available The starting stage of the tender procedures in Russia with the participation of foreign suppliers dictates the feasibility of the developments for economical methods directed to comparison of technical solutions on the construction field. The article describes the example of practical Life Cycle Cost (LCC evaluations under respect of Present Value (PV determination. These create a possibility for investor to estimate long-term projects (indicated as 25 years as commercially profitable, taking into account inflation rate, interest rate, real discount rate (indicated as 5 %. For economic analysis air-blower station of WWTP was selected as a significant energy consumer. Technical variants for the comparison of blower types are: 1 - multistage without control, 2 - multistage with VFD control, 3 - single stage double vane control. The result of LCC estimation shows the last variant as most attractive or cost-effective for investments with economy of 17,2 % (variant 1 and 21,0 % (variant 2 under adopted duty conditions and evaluations of capital costs (Cic + Cin with annual expenditure related (Ce+Co+Cm. The adopted duty conditions include daily and seasonal fluctuations of air flow. This was the reason for the adopted energy consumption as, kW∙h: 2158 (variant 1,1743...2201 (variant 2, 1058...1951 (variant 3. The article refers to Europump guide tables in order to simplify sophisticated factors search (Cp /Cn, df, which can be useful for economical analyses in Russia. Example of evaluations connected with energy-efficient solutions is given, but this reference involves the use of materials for the cases with resource savings, such as all types of fuel. In conclusion follows the assent to use LCC indicator jointly with the method of determining discounted cash flows, that will satisfy the investor’s need for interest source due to technical and economical comparisons.

  12. Economic Analysis on Direct Use of Spent Pressurized Water Reactor Fuel in CANDU Reactors - IV: DUPIC Fuel Cycle Cost

    International Nuclear Information System (INIS)

    Ko, Won Il; Choi, Hangbok; Yang, Myung Seung

    2001-01-01

    This study examines the economics of the DUPIC fuel cycle using unit costs of fuel cycle components estimated based on conceptual designs. The fuel cycle cost (FCC) was calculated by a deterministic method in which reference values of fuel cycle components are used. The FCC was then analyzed by a Monte Carlo simulation to get the uncertainty of the FCC associated with the unit costs of the fuel cycle components. From the deterministic analysis on the equilibrium fuel cycle model, the DUPIC FCC was estimated to be 6.21 to 6.34 mills/kW.h for DUPIC fuel options, which is a little smaller than that of the once-through FCC by 0.07 to 0.27 mills/kW.h. Considering the uncertainty (0.40 to 0.44 mills/kW.h) of the FCC estimated by the Monte Carlo simulation method, the cost difference between the DUPIC and once-through fuel cycle is negligible. On the other hand, the material balance calculation has shown that the DUPIC fuel cycle can save natural uranium resources by ∼20% and reduce the spent fuel arising by ∼65% compared with the once-through fuel cycle. In conclusion, the DUPIC fuel cycle is comparable with the once-through fuel cycle from the viewpoint of FCC. In the future, it should be important to consider factors such as the environmental benefit owing to natural uranium savings, the capability of reusing spent pressurized water reactor fuel, and the safeguardability of the fuel cycle when deciding on an advanced nuclear fuel cycle option

  13. Cascading costs: an economic nitrogen cycle.

    Science.gov (United States)

    Moomaw, William R; Birch, Melissa B L

    2005-09-01

    The chemical nitrogen cycle is becoming better characterized in terms of fluxes and reservoirs on a variety of scales. Galloway has demonstrated that reactive nitrogen can cascade through multiple ecosystems causing environmental damage at each stage before being denitrified to N(2). We propose to construct a parallel economic nitrogen cascade (ENC) in which economic impacts of nitrogen fluxes can be estimated by the costs associated with each stage of the chemical cascade. Using economic data for the benefits of damage avoided and costs of mitigation in the Chesapeake Bay basin, we have constructed an economic nitrogen cascade for the region. Since a single ton of nitrogen can cascade through the system, the costs also cascade. Therefore evaluating the benefits of mitigating a ton of reactive nitrogen released needs to consider the damage avoided in all of the ecosystems through which that ton would cascade. The analysis reveals that it is most cost effective to remove a ton of nitrogen coming from combustion since it has the greatest impact on human health and creates cascading damage through the atmospheric, terrestrial, aquatic and coastal ecosystems. We will discuss the implications of this analysis for determining the most cost effective policy option for achieving environmental quality goals.

  14. Edgeworth Price Cycles, Cost-Based Pricing, and Sticky Pricing in Retail Gasoline Markets

    OpenAIRE

    Michael D. Noel

    2007-01-01

    This paper examines dynamic pricing behavior in retail gasoline markets for 19 Canadian cities over 574 weeks. I find three distinct retail pricing patterns: 1. cost-based pricing, 2. sticky pricing, and 3. steep, asymmetric retail price cycles that, while seldom documented empirically, resemble those of Maskin & Tirole[1988]. Using a Markov switching regression, I estimate the prevalence of patterns and the structural characteristics of the cycles. Retail price cycles prevail in over 40% of ...

  15. Life cycle cost estimation and environmental valuation of coal mine tailings management

    Directory of Open Access Journals (Sweden)

    Joni Safaat Adiansyah

    2017-01-01

    Full Text Available Sustainable mining management is increasingly seen as an important issue in achieving a social license to operate for mining companies. This study describes the life cycle cost (LCC analysis and environmental valuation for several coal mine tailings management scenarios. The economic feasibility of six different options was assessed using the Net Present Value (NPV and Benefit-Cost Analysis (BCA methods. These options were belt press (OPT 1, tailings paste (OPT 2, thickened tailings (OPT 3, and OPT 1 with technology improvement and renewable energy sources (OPT 1A-C. The results revealed that OPT 1A (belt press technology with stack cell flotation was the first preference in terms of LCC while OPT 1C (belt press technology with stack cell flotation and 10% wind energy generated the highest benefits value (BCA compared to the other options. The LCC and BCA components and the volume of GHG emissions were used to determine the best option. Normalization of these three elements resulted in the selection of Option 1C as being the most cost-effective option.

  16. Life cycle cost report of VHLW cask

    International Nuclear Information System (INIS)

    1995-06-01

    This document, the Life Cycle Cost Report (LCCR) for the VHLW Cask, presents the life cycle costs for acquiring, using, and disposing of the VHLW casks. The VHLW cask consists of a ductile iron cask body, called the shielding insert, which is used for storage and transportation, and ultimately for disposal of Defense High Level Waste which has been vitrified and placed into VHLW canisters. Each ductile iron VHLW shielding insert holds one VHLW canister. For transportation, the shielding insert is placed into a containment overpack. The VHLW cask as configured for transportation is a legal weight truck cask which will be licensed by NRC. The purpose of this LCCR is to present the development of the life cycle costs for using the VHLW cask to transport VHLW canisters from the generating sites to a disposal site. Life cycle costs include the cost of acquiring, operating, maintaining, and ultimately dispositioning the VHLW cask and its associated hardware. This report summarizes costs associated with transportation of the VHLW casks. Costs are developed on the basis of expected usage, anticipated source and destination locations, and expected quantities of VHLW which must be transported. DOE overhead costs, such as the costs associated with source and destination facility handling of the VHLW, are not included. Also not included are costs exclusive to storage or disposal of the VHLW waste

  17. Fuel cycle cost analysis on molten-salt reactors

    International Nuclear Information System (INIS)

    Shimazu, Yoichiro

    1976-01-01

    An evaluation is made of the fuel cycle costs for molten-salt reactors (MSR's), developed at Oak Ridge National Laboratory. Eight combinations of conditions affecting fuel cycle costs are compared, covering 233 U-Th, 235 U-Th and 239 Pu-Th fuels, with and without on-site continuous fuel reprocessing. The resulting fuel cycle costs range from 0.61 to 1.18 mill/kWh. A discussion is also given on the practicability of these fuel cycles. The calculations indicate that somewhat lower fuel cycle costs can be expected from reactor operation in converter mode on 235 U make-up with fuel reprocessed in batches every 10 years to avoid fission product precipitation, than from operation as 233 U-Th breeder with continuous reprocessing. (auth.)

  18. Uncertainty and sensitivity analyses of ballast life-cycle cost and payback period

    OpenAIRE

    Mcmahon, James E.

    2000-01-01

    The paper introduces an innovative methology for evaluating the relative significance of energy-efficient technologies applied to fluorescent lamp ballasts. The method involves replacing the point estimates of life cycle cost of the ballasts with uncertainty distributions reflecting the whole spectrum of possible costs, and the assessed probability associated with each value. The results of uncertainty and sensitivity analyses will help analysts reduce effort in data collection and carry on a...

  19. The great environmental restoration cost estimating shootout: A blind test of three DOE cost estimating groups

    International Nuclear Information System (INIS)

    Klemen, Paul

    1992-01-01

    The cost of the Department of Energy's (DOE) Environmental Restoration (ER) Program has increased steadily over the last three years and, in the process, has drawn increasing scrutiny from Congress, the public, and government agencies such as the Office of Management and Budget and the General Accounting Office. Programmatic costs have been reviewed by many groups from within the DOE as well as from outside agencies. While cost may appear to be a universally applicable barometer of project conditions, it is actually a single dimensional manifestation of a complex set of conditions. As such, variations in cost estimates can be caused by a variety of underlying factors such as changes in scope, schedule, performing organization, economic conditions, or regulatory environment. This paper will examine the subject of cost estimates by evaluating three different cost estimates prepared for a single project including two estimates prepared by project proponents and another estimate prepared by a review team. The paper identifies the reasons for cost growth as measured by the different estimates and evaluates the ability of review estimates to measure the validity of costs. The comparative technique used to test the three cost estimates will identify the reasons for changes in the estimated cost, over time, and evaluate the ability of an independent review to correctly identify the reasons for cost growth and evaluate the reasonableness of the cost proposed by the project proponents. Recommendations are made for improved cost estimates and improved cost estimate reviews. Conclusions are reached regarding the differences in estimate results that can be attributed to differences in estimating techniques, the implications of these differences for decision makers, and circumstances that are unique to environmental cost estimating. (author)

  20. Modelling User-Costs in Life Cycle Cost-Benefit (LCCB) analysis

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    2008-01-01

    The importance of including user's costs in Life-Cycle Cost-Benefit analysis of structures is discussed in this paper. This is especially for bridges of great importance. Repair or/and failure of a bridge will usually result in user costs greater than the repair or replacement costs of the bridge...

  1. COSTMODL - AN AUTOMATED SOFTWARE DEVELOPMENT COST ESTIMATION TOOL

    Science.gov (United States)

    Roush, G. B.

    1994-01-01

    The cost of developing computer software consumes an increasing portion of many organizations' budgets. As this trend continues, the capability to estimate the effort and schedule required to develop a candidate software product becomes increasingly important. COSTMODL is an automated software development estimation tool which fulfills this need. Assimilating COSTMODL to any organization's particular environment can yield significant reduction in the risk of cost overruns and failed projects. This user-customization capability is unmatched by any other available estimation tool. COSTMODL accepts a description of a software product to be developed and computes estimates of the effort required to produce it, the calendar schedule required, and the distribution of effort and staffing as a function of the defined set of development life-cycle phases. This is accomplished by the five cost estimation algorithms incorporated into COSTMODL: the NASA-developed KISS model; the Basic, Intermediate, and Ada COCOMO models; and the Incremental Development model. This choice affords the user the ability to handle project complexities ranging from small, relatively simple projects to very large projects. Unique to COSTMODL is the ability to redefine the life-cycle phases of development and the capability to display a graphic representation of the optimum organizational structure required to develop the subject project, along with required staffing levels and skills. The program is menu-driven and mouse sensitive with an extensive context-sensitive help system that makes it possible for a new user to easily install and operate the program and to learn the fundamentals of cost estimation without having prior training or separate documentation. The implementation of these functions, along with the customization feature, into one program makes COSTMODL unique within the industry. COSTMODL was written for IBM PC compatibles, and it requires Turbo Pascal 5.0 or later and Turbo

  2. Estimating externalities of biomass fuel cycles, Report 7

    Energy Technology Data Exchange (ETDEWEB)

    Barnthouse, L.W.; Cada, G.F.; Cheng, M.-D.; Easterly, C.E.; Kroodsma, R.L.; Lee, R.; Shriner, D.S.; Tolbert, V.R.; Turner, R.S.

    1998-01-01

    This report documents the analysis of the biomass fuel cycle, in which biomass is combusted to produce electricity. The major objectives of this study were: (1) to implement the methodological concepts which were developed in the Background Document (ORNL/RFF 1992) as a means of estimating the external costs and benefits of fuel cycles, and by so doing, to demonstrate their application to the biomass fuel cycle; (2) to develop, given the time and resources, a range of estimates of marginal (i.e., the additional or incremental) damages and benefits associated with selected impact-pathways from a new wood-fired power plant, using a representative benchmark technology, at two reference sites in the US; and (3) to assess the state of the information available to support energy decision making and the estimation of externalities, and by so doing, to assist in identifying gaps in knowledge and in setting future research agendas. The demonstration of methods, modeling procedures, and use of scientific information was the most important objective of this study. It provides an illustrative example for those who will, in the future, undertake studies of actual energy options and sites. As in most studies, a more comprehensive analysis could have been completed had budget constraints not been as severe. Particularly affected were the air and water transport modeling, estimation of ecological impacts, and economic valuation. However, the most important objective of the study was to demonstrate methods, as a detailed example for future studies. Thus, having severe budget constraints was appropriate from the standpoint that these studies could also face similar constraints. Consequently, an important result of this study is an indication of what can be done in such studies, rather than the specific numerical estimates themselves.

  3. Cost analysis and economic comparison for alternative fuel cycles in the heavy water cooled canadian reactor (CANDU)

    International Nuclear Information System (INIS)

    Yilmaz, S.

    2000-01-01

    Three main options in a CANDU fuel cycle involve use of: (1) natural uranium (0.711 weight percent U-235) fuel, (2) slightly enriched uranium (1.2 weight percent U-235) fuel, and (3) recovered uranium (0.83 weight percent U-235) fuel from light water reactor spent fuel. ORIGEN-2 computer code was used to identify composition of the spent fuel for each option, including the standard LWR fuel (3.3 weight percent U-235). Uranium and plutonium credit calculations were performed using ORIGEN-2 output. WIMSD-5 computer code was used to determine maximum discharge burnup values for each case. For the 3 cycles selected (natural uranium, slightly enriched uranium, recovered uranium), levelized fuel cycle cost calculations are performed over the reactor lifetime of 40 years, using unit process costs obtained from literature. Components of the fuel cycle costs are U purchase, conversion, enrichment, fabrication, SF storage, SF disposal, and reprocessing where applicable. Cost parameters whose effects on the fuel cycle cost are to be investigated are escalation ratio, discount rate and SF storage time. Cost estimations were carried out using specially developed computer programs. Share of each cost component on the total cost was determined and sensitivity analysis was performed in order to show how a change in a main cost component affects the fuel cycle cost. The main objective of this study has been to find out the most economical option for CANDU fuel cycle by changing unit prices and cost parameters

  4. Estimation of costs for fabrication of pressurized-water reactor fuel

    International Nuclear Information System (INIS)

    Judkins, R.R.; Olsen, A.R.

    1979-01-01

    To provide a reference case on which to base cost estimates of the several fuel cycles to be considered, the facility, equipment, and operating requirements for the fabrication of fuel for current-design pressurized-water reactors were examined. From an analysis of these requirements, the capital and operating costs of a plant with a capacity of two metric tons of heavy metal per day (MTHM/day) were estimated. In a cash flow analysis, the lifetime of the plant was assumed to be 20 y, and the income from the sale of nuclear fuel assemblies over this period was equated to the total capital and operating expenses of the plant, including a specified 15% return on investment. In this way a levelized unit price for the fuel was obtained. The effects of inflation were not considered since the purpose of these estimates and the determination of unit price was to permit comparison of different types of fuels. The capital costs of the fuel fabrication plant were estimated at $32 million for the facility--land, site preparation, building--and $34 million for equipment. Annual operating costs including labor, management, materials, and utilities were estimated to be $36.5 million. From these estimates, the unit price for fabricating the fuel for the reference pressurized-water reactor was determined to be $138/kg of heavy metal or $63,600 per fuel assembly

  5. Unit Commitment With Dynamic Cycling Costs

    OpenAIRE

    Troy, Niamh; Flynn, Damian; Milligan, Michael R.; et al.

    2012-01-01

    Increased competition in the electricity sector and the integration of variable renewable energy sources is resulting in more frequent cycling of thermal plant. Thus, the wear-and-tear to generator components and the related costs are a growing concern for plant owners and system operators alike. This paper presents a formulation that can be implemented in a MIP dispatch model to dynamically model cycling costs based on unit operation. When implemented for a test system, the results show that...

  6. A life cycle cost economics model for projects with uniformly varying operating costs. [management planning

    Science.gov (United States)

    Remer, D. S.

    1977-01-01

    A mathematical model is developed for calculating the life cycle costs for a project where the operating costs increase or decrease in a linear manner with time. The life cycle cost is shown to be a function of the investment costs, initial operating costs, operating cost gradient, project life time, interest rate for capital and salvage value. The results show that the life cycle cost for a project can be grossly underestimated (or overestimated) if the operating costs increase (or decrease) uniformly over time rather than being constant as is often assumed in project economic evaluations. The following range of variables is examined: (1) project life from 2 to 30 years; (2) interest rate from 0 to 15 percent per year; and (3) operating cost gradient from 5 to 90 percent of the initial operating costs. A numerical example plus tables and graphs is given to help calculate project life cycle costs over a wide range of variables.

  7. The Psychology of Cost Estimating

    Science.gov (United States)

    Price, Andy

    2016-01-01

    Cost estimation for large (and even not so large) government programs is a challenge. The number and magnitude of cost overruns associated with large Department of Defense (DoD) and National Aeronautics and Space Administration (NASA) programs highlight the difficulties in developing and promulgating accurate cost estimates. These overruns can be the result of inadequate technology readiness or requirements definition, the whims of politicians or government bureaucrats, or even as failures of the cost estimating profession itself. However, there may be another reason for cost overruns that is right in front of us, but only recently have we begun to grasp it: the fact that cost estimators and their customers are human. The last 70+ years of research into human psychology and behavioral economics have yielded amazing findings into how we humans process and use information to make judgments and decisions. What these scientists have uncovered is surprising: humans are often irrational and illogical beings, making decisions based on factors such as emotion and perception, rather than facts and data. These built-in biases to our thinking directly affect how we develop our cost estimates and how those cost estimates are used. We cost estimators can use this knowledge of biases to improve our cost estimates and also to improve how we communicate and work with our customers. By understanding how our customers think, and more importantly, why they think the way they do, we can have more productive relationships and greater influence. By using psychology to our advantage, we can more effectively help the decision maker and our organizations make fact-based decisions.

  8. Comparing NASA and ESA Cost Estimating Methods for Human Missions to Mars

    Science.gov (United States)

    Hunt, Charles D.; vanPelt, Michel O.

    2004-01-01

    To compare working methodologies between the cost engineering functions in NASA Marshall Space Flight Center (MSFC) and ESA European Space Research and Technology Centre (ESTEC), as well as to set-up cost engineering capabilities for future manned Mars projects and other studies which involve similar subsystem technologies in MSFC and ESTEC, a demonstration cost estimate exercise was organized. This exercise was a direct way of enhancing not only cooperation between agencies but also both agencies commitment to credible cost analyses. Cost engineers in MSFC and ESTEC independently prepared life-cycle cost estimates for a reference human Mars project and subsequently compared the results and estimate methods in detail. As a non-sensitive, public domain reference case for human Mars projects, the Mars Direct concept was chosen. In this paper the results of the exercise are shown; the differences and similarities in estimate methodologies, philosophies, and databases between MSFC and ESTEC, as well as the estimate results for the Mars Direct concept. The most significant differences are explained and possible estimate improvements identified. In addition, the Mars Direct plan and the extensive cost breakdown structure jointly set-up by MSFC and ESTEC for this concept are presented. It was found that NASA applied estimate models mainly based on historic Apollo and Space Shuttle cost data, taking into account the changes in technology since then. ESA used models mostly based on European satellite and launcher cost data, taking into account the higher equipment and testing standards for human space flight. Most of NASA's and ESA s estimates for the Mars Direct case are comparable, but there are some important, consistent differences in the estimates for: 1) Large Structures and Thermal Control subsystems; 2) System Level Management, Engineering, Product Assurance and Assembly, Integration and Test/Verification activities; 3) Mission Control; 4) Space Agency Program Level

  9. Uncertainty and sensitivity analyses of ballast life-cycle cost and payback period

    Energy Technology Data Exchange (ETDEWEB)

    McMahon, James E.; Liu, Xiaomin; Turiel, Ike; Hakim, Sajid; Fisher, Diane

    2000-06-01

    The paper introduces an innovative methodology for evaluating the relative significance of energy-efficient technologies applied to fluorescent lamp ballasts. The method involves replacing the point estimates of life cycle cost of the ballasts with uncertainty distributions reflecting the whole spectrum of possible costs, and the assessed probability associated with each value. The results of uncertainty and sensitivity analyses will help analysts reduce effort in data collection and carry on analysis more efficiently. These methods also enable policy makers to gain an insightful understanding of which efficient technology alternatives benefit or cost what fraction of consumers, given the explicit assumptions of the analysis.

  10. Approaches to estimating decommissioning costs

    International Nuclear Information System (INIS)

    Smith, R.I.

    1990-07-01

    The chronological development of methodology for estimating the cost of nuclear reactor power station decommissioning is traced from the mid-1970s through 1990. Three techniques for developing decommissioning cost estimates are described. The two viable techniques are compared by examining estimates developed for the same nuclear power station using both methods. The comparison shows that the differences between the estimates are due largely to differing assumptions regarding the size of the utility and operating contractor overhead staffs. It is concluded that the two methods provide bounding estimates on a range of manageable costs, and provide reasonable bases for the utility rate adjustments necessary to pay for future decommissioning costs. 6 refs

  11. Economics analysis of fuel cycle cost of fusion–fission hybrid reactors based on different fuel cycle strategies

    Energy Technology Data Exchange (ETDEWEB)

    Zu, Tiejun, E-mail: tiejun@mail.xjtu.edu.cn; Wu, Hongchun; Zheng, Youqi; Cao, Liangzhi

    2015-01-15

    Highlights: • Economics analysis of fuel cycle cost of FFHRs is carried out. • The mass flows of different fuel cycle strategies are established based on the equilibrium fuel cycle model. • The levelized fuel cycle costs of different fuel cycle strategies are calculated, and compared with current once-through fuel cycle. - Abstract: The economics analysis of fuel cycle cost of fusion–fission hybrid reactors has been performed to compare four fuel cycle strategies: light water cooled blanket burning natural uranium (Strategy A) or spent nuclear fuel (Strategy B), sodium cooled blanket burning transuranics (Strategy C) or minor actinides (Strategy D). The levelized fuel cycle costs (LFCC) which does not include the capital cost, operation and maintenance cost have been calculated based on the equilibrium mass flows. The current once-through (OT) cycle strategy has also been analyzed to serve as the reference fuel cycle for comparisons. It is found that Strategy A and Strategy B have lower LFCCs than OT cycle; although the LFCC of Strategy C is higher than that of OT cycle when the uranium price is at its nominal value, it would become comparable to that of OT cycle when the uranium price reaches its historical peak value level; Strategy D shows the highest LFCC, because it needs to reprocess huge mass of spent nuclear fuel; LFCC is sensitive to the discharge burnup of the nuclear fuel.

  12. Life cycle cost analysis changes mixed waste treatment program at the Savannah River Site

    International Nuclear Information System (INIS)

    Pickett, J.B.; England, J.L.; Martin, H.L.

    1992-01-01

    A direct result of the reduced need for weapons production has been a re-evaluation of the treatment projects for mixed (hazardous/radioactive) wastes generated from metal finishing and plating operations and from a mixed waste incinerator at the Savannah River Site (SRS). A Life Cycle Cost (LCC) analysis was conducted for two waste treatment projects to determine the most cost effective approach in response to SRS mission changes. A key parameter included in the LCC analysis was the cost of the disposal vaults required for the final stabilized wasteform(s) . The analysis indicated that volume reduction of the final stabilized wasteform(s) can provide significant cost savings. The LCC analysis demonstrated that one SRS project could be eliminated, and a second project could be totally ''rescoped and downsized.'' The changes resulted in an estimated Life Cycle Cost saving (over a 20 year period) of $270,000,000

  13. User’s Guide for Naval Material Command’s Life Cycle Cost (FLEX) Model.

    Science.gov (United States)

    1982-04-01

    WBS) of both simple and complex programs. o The model can use a different cost estimating procedure for each element of the CBS (i.e., algorithm and...cycle. (yrs) E-15 I .. 22 Govenm.n: .Al. Scale Devel.-,menz - cstr Def Lntion: .he costs included in t.his subcategory include: 1.22C0 ?roject I&nagement

  14. Improving life-cycle cost management in the US. Army: analysis of the U.S. Army and Commercial Businesses life-cycle cost management.

    OpenAIRE

    White, Bradley A.

    2001-01-01

    The roles and responsibilities of the Army acquisition and logistics communities, as they pertain to the life-cycle management, are undergoing fundamental change. The early identification and total control of life-cycle cost, in particular operations and sustainment costs which comprises as much as 70-80% of a systems total life-cycle cost, is a high priority for the Army. The basis of this change is adoption of commercial best practices to support the Army's goal to organize. tram. equip, an...

  15. The Cost Analysis of Corrosion Protection Solutions for Steel Components in Terms of the Object Life Cycle Cost

    Directory of Open Access Journals (Sweden)

    Kowalski Dariusz

    2017-09-01

    Full Text Available Steel materials, due to their numerous advantages - high availability, easiness of processing and possibility of almost any shaping are commonly applied in construction for carrying out basic carrier systems and auxiliary structures. However, the major disadvantage of this material is its high corrosion susceptibility, which depends strictly on the local conditions of the facility and the applied type of corrosion protection system. The paper presents an analysis of life cycle costs of structures installed on bridges used in the road lane conditions. Three anti-corrosion protection systems were considered, analyzing their essential cost components. The possibility of reducing significantly the costs associated with anti-corrosion protection at the stage of steel barriers maintenance over a period of 30 years has been indicated. The possibility of using a new approach based on the life cycle cost estimation in the anti-corrosion protection of steel elements is presented. The relationship between the method of steel barrier protection, the scope of repair, renewal work and costs is shown. The article proposes an optimal solution which, while reducing the cost of maintenance of road infrastructure components in the area of corrosion protection, allows to maintain certain safety standards for steel barriers that are installed on the bridge.

  16. The Cost Analysis of Corrosion Protection Solutions for Steel Components in Terms of the Object Life Cycle Cost

    Science.gov (United States)

    Kowalski, Dariusz; Grzyl, Beata; Kristowski, Adam

    2017-09-01

    Steel materials, due to their numerous advantages - high availability, easiness of processing and possibility of almost any shaping are commonly applied in construction for carrying out basic carrier systems and auxiliary structures. However, the major disadvantage of this material is its high corrosion susceptibility, which depends strictly on the local conditions of the facility and the applied type of corrosion protection system. The paper presents an analysis of life cycle costs of structures installed on bridges used in the road lane conditions. Three anti-corrosion protection systems were considered, analyzing their essential cost components. The possibility of reducing significantly the costs associated with anti-corrosion protection at the stage of steel barriers maintenance over a period of 30 years has been indicated. The possibility of using a new approach based on the life cycle cost estimation in the anti-corrosion protection of steel elements is presented. The relationship between the method of steel barrier protection, the scope of repair, renewal work and costs is shown. The article proposes an optimal solution which, while reducing the cost of maintenance of road infrastructure components in the area of corrosion protection, allows to maintain certain safety standards for steel barriers that are installed on the bridge.

  17. Guideline to Estimate Decommissioning Costs

    Energy Technology Data Exchange (ETDEWEB)

    Yun, Taesik; Kim, Younggook; Oh, Jaeyoung [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    The primary objective of this work is to provide guidelines to estimate the decommissioning cost as well as the stakeholders with plausible information to understand the decommissioning activities in a reasonable manner, which eventually contribute to acquiring the public acceptance for the nuclear power industry. Although several cases of the decommissioning cost estimate have been made for a few commercial nuclear power plants, the different technical, site-specific and economic assumptions used make it difficult to interpret those cost estimates and compare them with that of a relevant plant. Trustworthy cost estimates are crucial to plan a safe and economic decommissioning project. The typical approach is to break down the decommissioning project into a series of discrete and measurable work activities. Although plant specific differences derived from the economic and technical assumptions make a licensee difficult to estimate reliable decommissioning costs, estimating decommissioning costs is the most crucial processes since it encompasses all the spectrum of activities from the planning to the final evaluation on whether a decommissioning project has successfully been preceded from the perspective of safety and economic points. Hence, it is clear that tenacious efforts should be needed to successfully perform the decommissioning project.

  18. Analysis of advanced European nuclear fuel cycle scenarios including transmutation and economic estimates

    International Nuclear Information System (INIS)

    Rodríguez, Iván Merino; Álvarez-Velarde, Francisco; Martín-Fuertes, Francisco

    2014-01-01

    Highlights: • Four fuel cycle scenarios have been analyzed in resources and economic terms. • Scenarios involve Once-Through, Pu burning, and MA transmutation strategies. • No restrictions were found in terms of uranium and plutonium availability. • The best case cost and the impact of their uncertainties to the LCOE were analyzed. - Abstract: Four European fuel cycle scenarios involving transmutation options (in coherence with PATEROS and CP-ESFR EU projects) have been addressed from a point of view of resources utilization and economic estimates. Scenarios include: (i) the current fleet using Light Water Reactor (LWR) technology and open fuel cycle, (ii) full replacement of the initial fleet with Fast Reactors (FR) burning U–Pu MOX fuel, (iii) closed fuel cycle with Minor Actinide (MA) transmutation in a fraction of the FR fleet, and (iv) closed fuel cycle with MA transmutation in dedicated Accelerator Driven Systems (ADS). All scenarios consider an intermediate period of GEN-III+ LWR deployment and they extend for 200 years, looking for long term equilibrium mass flow achievement. The simulations were made using the TR E VOL code, capable to assess the management of the nuclear mass streams in the scenario as well as economics for the estimation of the levelized cost of electricity (LCOE) and other costs. Results reveal that all scenarios are feasible according to nuclear resources demand (natural and depleted U, and Pu). Additionally, we have found as expected that the FR scenario reduces considerably the Pu inventory in repositories compared to the reference scenario. The elimination of the LWR MA legacy requires a maximum of 55% fraction (i.e., a peak value of 44 FR units) of the FR fleet dedicated to transmutation (MA in MOX fuel, homogeneous transmutation) or an average of 28 units of ADS plants (i.e., a peak value of 51 ADS units). Regarding the economic analysis, the main usefulness of the provided economic results is for relative comparison of

  19. Contractor-style tunnel cost estimating

    International Nuclear Information System (INIS)

    Scapuzzi, D.

    1990-06-01

    Keeping pace with recent advances in construction technology is a challenge for the cost estimating engineer. Using an estimating style that simulates the actual construction process and is similar in style to the contractor's estimate will give a realistic view of underground construction costs. For a contractor-style estimate, a mining method is chosen; labor crews, plant and equipment are selected, and advance rates are calculated for the various phases of work which are used to determine the length of time necessary to complete each phase of work. The durations are multiplied by the cost or labor and equipment per unit of time and, along with the costs for materials and supplies, combine to complete the estimate. Variations in advance rates, ground support, labor crew size, or other areas are more easily analyzed for their overall effect on the cost and schedule of a project. 14 figs

  20. Optimization of life cycle management costs

    International Nuclear Information System (INIS)

    Banerjee, A.K.

    1994-01-01

    As can be seen from the case studies, a LCM program needs to address and integrate, in the decision process, technical, political, licensing, remaining plant life, component replacement cycles, and financial issues. As part of the LCM evaluations, existing plant programs, ongoing replacement projects, short and long-term operation and maintenance issues, and life extension strategies must be considered. The development of the LCM evaluations and the cost benefit analysis identifies critical technical and life cycle cost parameters. These open-quotes discoveriesclose quotes result from the detailed and effective use of a consistent, quantifiable, and well documented methodology. The systematic development and implementation of a plant-wide LCM program provides for an integrated and structured process that leads to the most practical and effective recommendations. Through the implementation of these recommendations and cost effective decisions, the overall power production costs can be controlled and ultimately lowered

  1. A REVIEW OF ESTIMATION OF SOFTWARE PRODUCTS DEVELOPMENT COSTS

    Directory of Open Access Journals (Sweden)

    Edin Osmanbegović

    2017-01-01

    Full Text Available In the modern business and management of business processes, the standardization of procedures allows the creation of added value, increasing competitiveness and success in the business of an organization. Evaluation of the budget for software development is crucial to the success of an IT project, because the inability to make a realistic assessment leads to inadequate project plans, customer dissatisfaction, poor quality of software products, and reduced profits. In order to minimize such situations, making accurate and reliable software cost estimation should be carried out at all stages of the project life cycle. Although hundreds of research articles focusing on the application of different methods of budget estimates of the software product have been published so far, there is no comprehensive review of the current situation or review of research trends in the budget estimates of the software product. This paper aims to create a framework for estimation of costs of development of software products by providing an overview of the most influential researchers, the most influential articles published in the WoS database, the most used keywords for searching the articles, as well as a review of the estimation techniques used in budget estimates of the software product.

  2. Cost Estimating Handbook for Environmental Restoration

    International Nuclear Information System (INIS)

    1993-01-01

    Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals

  3. Life Cycle Assessment and Costing Methods for Device Procurement: Comparing Reusable and Single-Use Disposable Laryngoscopes.

    Science.gov (United States)

    Sherman, Jodi D; Raibley, Lewis A; Eckelman, Matthew J

    2018-01-09

    Traditional medical device procurement criteria include efficacy and safety, ease of use and handling, and procurement costs. However, little information is available about life cycle environmental impacts of the production, use, and disposal of medical devices, or about costs incurred after purchase. Reusable and disposable laryngoscopes are of current interest to anesthesiologists. Facing mounting pressure to quickly meet or exceed conflicting infection prevention guidelines and oversight body recommendations, many institutions may be electively switching to single-use disposable (SUD) rigid laryngoscopes or overcleaning reusables, potentially increasing both costs and waste generation. This study provides quantitative comparisons of environmental impacts and total cost of ownership among laryngoscope options, which can aid procurement decision making to benefit facilities and public health. We describe cradle-to-grave life cycle assessment (LCA) and life cycle costing (LCC) methods and apply these to reusable and SUD metal and plastic laryngoscope handles and tongue blade alternatives at Yale-New Haven Hospital (YNHH). The US Environmental Protection Agency's Tool for the Reduction and Assessment of Chemical and other environmental Impacts (TRACI) life cycle impact assessment method was used to model environmental impacts of greenhouse gases and other pollutant emissions. The SUD plastic handle generates an estimated 16-18 times more life cycle carbon dioxide equivalents (CO2-eq) than traditional low-level disinfection of the reusable steel handle. The SUD plastic tongue blade generates an estimated 5-6 times more CO2-eq than the reusable steel blade treated with high-level disinfection. SUD metal components generated much higher emissions than all alternatives. Both the SUD handle and SUD blade increased life cycle costs compared to the various reusable cleaning scenarios at YNHH. When extrapolated over 1 year (60,000 intubations), estimated costs increased

  4. Developing a Cost Model and Methodology to Estimate Capital Costs for Thermal Energy Storage

    Energy Technology Data Exchange (ETDEWEB)

    Glatzmaier, G.

    2011-12-01

    This report provides an update on the previous cost model for thermal energy storage (TES) systems. The update allows NREL to estimate the costs of such systems that are compatible with the higher operating temperatures associated with advanced power cycles. The goal of the Department of Energy (DOE) Solar Energy Technology Program is to develop solar technologies that can make a significant contribution to the United States domestic energy supply. The recent DOE SunShot Initiative sets a very aggressive cost goal to reach a Levelized Cost of Energy (LCOE) of 6 cents/kWh by 2020 with no incentives or credits for all solar-to-electricity technologies.1 As this goal is reached, the share of utility power generation that is provided by renewable energy sources is expected to increase dramatically. Because Concentrating Solar Power (CSP) is currently the only renewable technology that is capable of integrating cost-effective energy storage, it is positioned to play a key role in providing renewable, dispatchable power to utilities as the share of power generation from renewable sources increases. Because of this role, future CSP plants will likely have as much as 15 hours of Thermal Energy Storage (TES) included in their design and operation. As such, the cost and performance of the TES system is critical to meeting the SunShot goal for solar technologies. The cost of electricity from a CSP plant depends strongly on its overall efficiency, which is a product of two components - the collection and conversion efficiencies. The collection efficiency determines the portion of incident solar energy that is captured as high-temperature thermal energy. The conversion efficiency determines the portion of thermal energy that is converted to electricity. The operating temperature at which the overall efficiency reaches its maximum depends on many factors, including material properties of the CSP plant components. Increasing the operating temperature of the power generation

  5. ETE-EVAL: a methodology for D and D cost estimation

    International Nuclear Information System (INIS)

    Decobert, G.; Robic, S.; Vanel, V.

    2008-01-01

    In compliance with Article 20 of the sustainable radioactive materials and waste management act dated 28 June 2006, the CEA and AREVA are required every three years to revise the cost of decommissioning their facilities and to provide the necessary assets by constituting a dedicated fund. For the 2007 revision the CEA used ETE-EVAL V5. Similarly, AREVA reevaluated the cost of decontaminating and dismantling its facilities at La Hague, as the previous estimate in 2004 did not take into account the complete cleanup of all the structural work. ETE-EVAL V5 is a computer application designed to estimate the cost of decontamination and dismantling of basic nuclear installations (INB). It has been qualified by Bureau Veritas and audited. ETE-EVAL V5 has become the official software for cost assessment of CEA civilian and AREVA decommissioning projects. It has been used by the DPAD (Decontamination and Dismantling Projects Department) cost assessment group to estimate the cost of decommissioning some thirty facilities (cost update on completion for the dedicated fund for dismantling civilian CEA facilities) and by AREVA to estimate the cost of decommissioning its fuel cycle back-end facilities. Some necessary modifications are now being implemented to allow for the specific aspects of fuel cycle front-end facilities. The computational method is based on physical, radiological and waste inventories following a particular methodology, and on interviews with operating personnel to compile ratios and financial data (operating cost, etc.) and enter them in a database called GREEN (from the French acronym for Management Ratios for Assessment of Nuclear Facilities). ETE-EVAL V5 comprises the cost assessment module and GREEN database. It has been enriched with the lessons learned from experience, and can be adapted as necessary to meet installation-specific requirements. The cost assessment module allows the user to estimate decommissioning costs once the inventory has been

  6. Why Don't They Just Give Us Money? Project Cost Estimating and Cost Reporting

    Science.gov (United States)

    Comstock, Douglas A.; Van Wychen, Kristin; Zimmerman, Mary Beth

    2015-01-01

    Successful projects require an integrated approach to managing cost, schedule, and risk. This is especially true for complex, multi-year projects involving multiple organizations. To explore solutions and leverage valuable lessons learned, NASA's Virtual Project Management Challenge will kick off a three-part series examining some of the challenges faced by project and program managers when it comes to managing these important elements. In this first session of the series, we will look at cost management, with an emphasis on the critical roles of cost estimating and cost reporting. By taking a proactive approach to both of these activities, project managers can better control life cycle costs, maintain stakeholder confidence, and protect other current and future projects in the organization's portfolio. Speakers will be Doug Comstock, Director of NASA's Cost Analysis Division, Kristin Van Wychen, Senior Analyst in the GAO Acquisition and Sourcing Management Team, and Mary Beth Zimmerman, Branch Chief for NASA's Portfolio Analysis Branch, Strategic Investments Division. Moderator Ramien Pierre is from NASA's Academy for Program/Project and Engineering Leadership (APPEL).

  7. Estimated cost of overactive bladder in Thailand.

    Science.gov (United States)

    Prasopsanti, Kriangsak; Santi-Ngamkun, Apirak; Pornprasit, Kanokwan

    2007-11-01

    To estimate the annual direct and indirect costs of overactive bladder (OAB) in indigenous Thai people aged 18 years and over in the year 2005. Economically based models using diagnostic and treatment algorithms from clinical practice guidelines and current disease prevalence data were used to estimate direct and indirect costs of OAB. Prevalence and event probability estimates were obtained from the literature, national data sets, and expert opinion. Costs were estimated from a small survey using a cost questionnaire and from unit costs of King Chulalongkorn Memorial Hospital. The annual cost of OAB in Thailand is estimated as 1.9 billion USD. It is estimated to consume 1.14% of national GDP The cost includes 0.33 billion USD for direct medical costs, 1.3 billion USD for direct, nonmedical costs and 0.29 billion USD for indirect costs of lost productivity. The largest costs category was direct treatment costs of comorbidities associated with OAB. Costs of OAB medication accountedfor 14% of the total costs ofOAB.

  8. Magnitude X on the Richter Scale: Welfare Cost of Business Cycles in Developing Countries

    OpenAIRE

    Stephane Pallage; Michel Robe

    2000-01-01

    Economic fluctuations are much stronger in developing countries than in the United States. Yet, while a large literature debates what constitutes a reasonable estimate of the welfare cost of business cycles in the US, it remains an open question how large that cost is in developing countries. Using several model economies, we provide such a measure for a large number of low--income countries. Our first main result is that the welfare cost of output fluctuations per se is far from trivial in t...

  9. Estimating the Costs of Preventive Interventions

    Science.gov (United States)

    Foster, E. Michael; Porter, Michele M.; Ayers, Tim S.; Kaplan, Debra L.; Sandler, Irwin

    2007-01-01

    The goal of this article is to improve the practice and reporting of cost estimates of prevention programs. It reviews the steps in estimating the costs of an intervention and the principles that should guide estimation. The authors then review prior efforts to estimate intervention costs using a sample of well-known but diverse studies. Finally,…

  10. Gasoline Prices, Transport Costs, and the U.S. Business Cycles

    OpenAIRE

    Hakan Yilmazkuday

    2014-01-01

    The e¡èects of gasoline prices on the U.S. business cycles are investigated. In order to distinguish between gasoline supply and gasoline demand shocks, the price of gasoline is endogenously determined through a transportation sector that uses gasoline as an input of production. The model is estimated for the U.S. economy using five macroeconomic time series, including data on transport costs and gasoline prices. The results show that although standard shocks in the literature (e.g., technolo...

  11. Laser cost experience and estimation

    International Nuclear Information System (INIS)

    Shofner, F.M.; Hoglund, R.L.

    1977-01-01

    This report addresses the question of estimating the capital and operating costs for LIS (Laser Isotope Separation) lasers, which have performance requirements well beyond the state of mature art. This question is seen with different perspectives by political leaders, ERDA administrators, scientists, and engineers concerned with reducing LIS to economically successful commercial practice, on a timely basis. Accordingly, this report attempts to provide ''ballpark'' estimators for capital and operating costs and useful design and operating information for lasers based on mature technology, and their LIS analogs. It is written very basically and is intended to respond about equally to the perspectives of administrators, scientists, and engineers. Its major contributions are establishing the current, mature, industrialized laser track record (including capital and operating cost estimators, reliability, types of application, etc.) and, especially, evolution of generalized estimating procedures for capital and operating cost estimators for new laser design

  12. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  13. Cost estimating for CERCLA remedial alternatives a unit cost methodology

    International Nuclear Information System (INIS)

    Brettin, R.W.; Carr, D.J.; Janke, R.J.

    1995-06-01

    The United States Environmental Protection Agency (EPA) Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA, Interim Final, dated October 1988 (EPA 1988) requires a detailed analysis be conducted of the most promising remedial alternatives against several evaluation criteria, including cost. To complete the detailed analysis, order-of-magnitude cost estimates (having an accuracy of +50 percent to -30 percent) must be developed for each remedial alternative. This paper presents a methodology for developing cost estimates of remedial alternatives comprised of various technology and process options with a wide range of estimated contaminated media quantities. In addition, the cost estimating methodology provides flexibility for incorporating revisions to remedial alternatives and achieves the desired range of accuracy. It is important to note that the cost estimating methodology presented here was developed as a concurrent path to the development of contaminated media quantity estimates. This methodology can be initiated before contaminated media quantities are estimated. As a result, this methodology is useful in developing cost estimates for use in screening and evaluating remedial technologies and process options. However, remedial alternative cost estimates cannot be prepared without the contaminated media quantity estimates. In the conduct of the feasibility study for Operable Unit 5 at the Fernald Environmental Management Project (FEMP), fourteen remedial alternatives were retained for detailed analysis. Each remedial alternative was composed of combinations of remedial technologies and processes which were earlier determined to be best suited for addressing the media-specific contaminants found at the FEMP site, and achieving desired remedial action objectives

  14. Cost estimate of the Yucca Mountain repository based on the site characterization plan conceptual design: Nevada Nuclear Waste Storage Investigations Project

    International Nuclear Information System (INIS)

    Gruer, E.R.; Fowler, M.E.; Rocha, G.A.

    1987-06-01

    This report of the life-cycle costs of a mined repository in tuff is based on the site characterization conceptual design and contains estimates of two methods of waste emplacement - vertical and horizontal. The life cycle of the repository progresses from design and construction to emplacement operations that last 25 years. When emplacement has ended, a caretaker period begins and continues until 50 years from emplacement of the first waste. The life of the repository concludes with closure and decommissioning, which includes backfilling and sealing the repository, decontaminating and razing the surface facilities, restoring the land to as near its original condition as possible, and marking the site. The estimates, developed for each phase of the life cycle of the repository, are based on January 1986 constant (unescalated) dollars and include an allowance for contingency. This report mainly comprises explanations of design and operating assumptions, estimating methods, exclusions, definition of cost accounts, calculating procedures, data sources, staffing and other qualifying remarks. Cost estimates are approximations of value and should not be construed as exact. The cost and staffing detail provided in this estimate is commensurate with the detail in the conceptual design

  15. Estimating pressurized water reactor decommissioning costs: A user's manual for the PWR Cost Estimating Computer Program (CECP) software

    International Nuclear Information System (INIS)

    Bierschbach, M.C.; Mencinsky, G.J.

    1993-10-01

    With the issuance of the Decommissioning Rule (July 27, 1988), nuclear power plant licensees are required to submit to the US Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. This user's manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personnel computer, provides estimates for the cost of decommissioning PWR plant stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning

  16. Cost-estimating relationships for space programs

    Science.gov (United States)

    Mandell, Humboldt C., Jr.

    1992-01-01

    Cost-estimating relationships (CERs) are defined and discussed as they relate to the estimation of theoretical costs for space programs. The paper primarily addresses CERs based on analogous relationships between physical and performance parameters to estimate future costs. Analytical estimation principles are reviewed examining the sources of errors in cost models, and the use of CERs is shown to be affected by organizational culture. Two paradigms for cost estimation are set forth: (1) the Rand paradigm for single-culture single-system methods; and (2) the Price paradigms that incorporate a set of cultural variables. For space programs that are potentially subject to even small cultural changes, the Price paradigms are argued to be more effective. The derivation and use of accurate CERs is important for developing effective cost models to analyze the potential of a given space program.

  17. Cost-estimating for commercial digital printing

    Science.gov (United States)

    Keif, Malcolm G.

    2007-01-01

    The purpose of this study is to document current cost-estimating practices used in commercial digital printing. A research study was conducted to determine the use of cost-estimating in commercial digital printing companies. This study answers the questions: 1) What methods are currently being used to estimate digital printing? 2) What is the relationship between estimating and pricing digital printing? 3) To what extent, if at all, do digital printers use full-absorption, all-inclusive hourly rates for estimating? Three different digital printing models were identified: 1) Traditional print providers, who supplement their offset presswork with digital printing for short-run color and versioned commercial print; 2) "Low-touch" print providers, who leverage the power of the Internet to streamline business transactions with digital storefronts; 3) Marketing solutions providers, who see printing less as a discrete manufacturing process and more as a component of a complete marketing campaign. Each model approaches estimating differently. Understanding and predicting costs can be extremely beneficial. Establishing a reliable system to estimate those costs can be somewhat challenging though. Unquestionably, cost-estimating digital printing will increase in relevance in the years ahead, as margins tighten and cost knowledge becomes increasingly more critical.

  18. Methods for cost estimation in software project management

    Science.gov (United States)

    Briciu, C. V.; Filip, I.; Indries, I. I.

    2016-02-01

    The speed in which the processes used in software development field have changed makes it very difficult the task of forecasting the overall costs for a software project. By many researchers, this task has been considered unachievable, but there is a group of scientist for which this task can be solved using the already known mathematical methods (e.g. multiple linear regressions) and the new techniques as genetic programming and neural networks. The paper presents a solution for building a model for the cost estimation models in the software project management using genetic algorithms starting from the PROMISE datasets related COCOMO 81 model. In the first part of the paper, a summary of the major achievements in the research area of finding a model for estimating the overall project costs is presented together with the description of the existing software development process models. In the last part, a basic proposal of a mathematical model of a genetic programming is proposed including here the description of the chosen fitness function and chromosome representation. The perspective of model described it linked with the current reality of the software development considering as basis the software product life cycle and the current challenges and innovations in the software development area. Based on the author's experiences and the analysis of the existing models and product lifecycle it was concluded that estimation models should be adapted with the new technologies and emerging systems and they depend largely by the chosen software development method.

  19. Cycling of conventional power plants: Technical limits and actual costs

    International Nuclear Information System (INIS)

    Van den Bergh, Kenneth; Delarue, Erik

    2015-01-01

    Highlights: • Literature reports a wide range of cycling parameters (technical and cost-related). • The impact of different cycling parameters is assessed. • The German 2013 system is studied as a case study. • Even for stringent parameters, the dynamic limit of the portfolio is not reached. • Cycling costs can be reduced with 40% when taken into account in the scheduling. - Abstract: Cycling of conventional generation units is an important source of operational flexibility in the electricity generation system. Cycling is changing the power output of conventional units by means of ramping and switching (starting up and shutting down). In the literature, a wide range of technical and cost-related cycling parameters can be found. Different studies allocate different cycling parameters to similar generation units. This paper assesses the impact of different cycling parameters allocated to a conventional generation portfolio. Both the technical limitations of power plants and all costs related to cycling are considered. The results presented in this paper follow from a unit commitment model, used for a case study based on the German 2013 system. The conventional generation portfolio has to deliver different residual load time series, corresponding to different levels of renewables penetration. The study shows, under the assumptions made, that although the dynamic limits of some units are reached, the limits of the conventional generation portfolio as a whole are not reached, even if stringent dynamic parameters are assigned to the generation portfolio and a highly variable residual load is imposed to the system. The study shows also the importance of including full cycling costs in the unit commitment scheduling. The cycling cost can be reduced by up to 40% when fully taken into account

  20. Selection of relevant items for decommissioning costing estimation of a PWR using fuzzy logic

    International Nuclear Information System (INIS)

    Monteiro, Deiglys Borges; Busse, Alexander Lucas; Moreira, Joao M.L.; Maiorino, Jose Rubens

    2015-01-01

    The decommissioning is an important part of a nuclear power plant life cycle which may occur by technical, economical or safety reasons. Decommissioning requires carrying out a large number of tasks that should be planned in advance, involves cost evaluations, preparation of plans of activity and actual operational actions. Despite the large number of tasks, only part of them is relevant for cost estimation purpose. The technical literature and international regulatory agencies suggest a variety of methods for decommissioning cost estimation. Most of them require a very detailed knowledge of the plant and data available suitable for plants that are starting their decommissioning but not for those in the planning stage. The present work aims to apply fuzzy logic to sort out relevant items to cost estimation in order to reduce the work effort involved. The scheme uses parametric equations for specific cost items, and is applied to specific parts of the process of nuclear power plant decommissioning. (author)

  1. Selection of relevant items for decommissioning costing estimation of a PWR using fuzzy logic

    Energy Technology Data Exchange (ETDEWEB)

    Monteiro, Deiglys Borges; Busse, Alexander Lucas; Moreira, Joao M.L.; Maiorino, Jose Rubens, E-mail: deiglys.monteiro@ufabc.edu.br, E-mail: alexlucasb@gmail.com, E-mail: joao.moreira@ufabc.edu.br, E-mail: joserubens.maiorino@ufabc.edu.br [Universidade Federal do ABC (CECS/UFABC), Santo Andre, SP (Brazil). Centro de Engenharia, Modelagem e Ciencias Aplicadas. Programa de Pos-Graduacao em Energia e Engenharia da Energia

    2015-07-01

    The decommissioning is an important part of a nuclear power plant life cycle which may occur by technical, economical or safety reasons. Decommissioning requires carrying out a large number of tasks that should be planned in advance, involves cost evaluations, preparation of plans of activity and actual operational actions. Despite the large number of tasks, only part of them is relevant for cost estimation purpose. The technical literature and international regulatory agencies suggest a variety of methods for decommissioning cost estimation. Most of them require a very detailed knowledge of the plant and data available suitable for plants that are starting their decommissioning but not for those in the planning stage. The present work aims to apply fuzzy logic to sort out relevant items to cost estimation in order to reduce the work effort involved. The scheme uses parametric equations for specific cost items, and is applied to specific parts of the process of nuclear power plant decommissioning. (author)

  2. Statistical methods of estimating mining costs

    Science.gov (United States)

    Long, K.R.

    2011-01-01

    Until it was defunded in 1995, the U.S. Bureau of Mines maintained a Cost Estimating System (CES) for prefeasibility-type economic evaluations of mineral deposits and estimating costs at producing and non-producing mines. This system had a significant role in mineral resource assessments to estimate costs of developing and operating known mineral deposits and predicted undiscovered deposits. For legal reasons, the U.S. Geological Survey cannot update and maintain CES. Instead, statistical tools are under development to estimate mining costs from basic properties of mineral deposits such as tonnage, grade, mineralogy, depth, strip ratio, distance from infrastructure, rock strength, and work index. The first step was to reestimate "Taylor's Rule" which relates operating rate to available ore tonnage. The second step was to estimate statistical models of capital and operating costs for open pit porphyry copper mines with flotation concentrators. For a sample of 27 proposed porphyry copper projects, capital costs can be estimated from three variables: mineral processing rate, strip ratio, and distance from nearest railroad before mine construction began. Of all the variables tested, operating costs were found to be significantly correlated only with strip ratio.

  3. Stand-alone flat-plate photovoltaic power systems: System sizing and life-cycle costing methodology for Federal agencies

    Science.gov (United States)

    Borden, C. S.; Volkmer, K.; Cochrane, E. H.; Lawson, A. C.

    1984-01-01

    A simple methodology to estimate photovoltaic system size and life-cycle costs in stand-alone applications is presented. It is designed to assist engineers at Government agencies in determining the feasibility of using small stand-alone photovoltaic systems to supply ac or dc power to the load. Photovoltaic system design considerations are presented as well as the equations for sizing the flat-plate array and the battery storage to meet the required load. Cost effectiveness of a candidate photovoltaic system is based on comparison with the life-cycle cost of alternative systems. Examples of alternative systems addressed are batteries, diesel generators, the utility grid, and other renewable energy systems.

  4. Influence of driving patterns on life cycle cost and emissions of hybrid and plug-in electric vehicle powertrains

    International Nuclear Information System (INIS)

    Karabasoglu, Orkun; Michalek, Jeremy

    2013-01-01

    We compare the potential of hybrid, extended-range plug-in hybrid, and battery electric vehicles to reduce lifetime cost and life cycle greenhouse gas emissions under various scenarios and simulated driving conditions. We find that driving conditions affect economic and environmental benefits of electrified vehicles substantially: Under the urban NYC driving cycle, hybrid and plug-in vehicles can cut life cycle emissions by 60% and reduce costs up to 20% relative to conventional vehicles (CVs). In contrast, under highway test conditions (HWFET) electrified vehicles offer marginal emissions reductions at higher costs. NYC conditions with frequent stops triple life cycle emissions and increase costs of conventional vehicles by 30%, while aggressive driving (US06) reduces the all-electric range of plug-in vehicles by up to 45% compared to milder test cycles (like HWFET). Vehicle window stickers, fuel economy standards, and life cycle studies using average lab-test vehicle efficiency estimates are therefore incomplete: (1) driver heterogeneity matters, and efforts to encourage adoption of hybrid and plug-in vehicles will have greater impact if targeted to urban drivers vs. highway drivers; and (2) electrified vehicles perform better on some drive cycles than others, so non-representative tests can bias consumer perception and regulation of alternative technologies. We discuss policy implications. - Highlights: • Electrified vehicle life cycle emissions and cost depend on driving conditions. • GHGs can triple in NYC conditions vs. highway (HWFET), cost +30%. • Under NYC conditions hybrid and plug-in vehicles cut GHGs up to 60%, cost 20%. • Under HWFET conditions they offer few GHG reductions at higher costs. • Federal tests for window labels and CAFE standards favor some technologies over others

  5. Accounting for the drug life cycle and future drug prices in cost-effectiveness analysis.

    Science.gov (United States)

    Hoyle, Martin

    2011-01-01

    Economic evaluations of health technologies typically assume constant real drug prices and model only the cohort of patients currently eligible for treatment. It has recently been suggested that, in the UK, we should assume that real drug prices decrease at 4% per annum and, in New Zealand, that real drug prices decrease at 2% per annum and at patent expiry the drug price falls. It has also recently been suggested that we should model multiple future incident cohorts. In this article, the cost effectiveness of drugs is modelled based on these ideas. Algebraic expressions are developed to capture all costs and benefits over the entire life cycle of a new drug. The lifetime of a new drug in the UK, a key model parameter, is estimated as 33 years, based on the historical lifetime of drugs in England over the last 27 years. Under the proposed methodology, cost effectiveness is calculated for seven new drugs recently appraised in the UK. Cost effectiveness as assessed in the future is also estimated. Whilst the article is framed in mathematics, the findings and recommendations are also explained in non-mathematical language. The 'life-cycle correction factor' is introduced, which is used to convert estimates of cost effectiveness as traditionally calculated into estimates under the proposed methodology. Under the proposed methodology, all seven drugs appear far more cost effective in the UK than published. For example, the incremental cost-effectiveness ratio decreases by 46%, from £61, 900 to £33, 500 per QALY, for cinacalcet versus best supportive care for end-stage renal disease, and by 45%, from £31,100 to £17,000 per QALY, for imatinib versus interferon-α for chronic myeloid leukaemia. Assuming real drug prices decrease over time, the chance that a drug is publicly funded increases over time, and is greater when modelling multiple cohorts than with a single cohort. Using the methodology (compared with traditional methodology) all drugs in the UK and New

  6. Fuel-cycle cost comparisons with oxide and silicide fuels

    International Nuclear Information System (INIS)

    Matos, J.E.; Freese, K.E.

    1982-01-01

    This paper addresses fuel cycle cost comparisons for a generic 10 MW reactor with HEU aluminide fuel and with LEU oxide and silicide fuels in several fuel element geometries. The intention of this study is to provide a consistent assessment of various design options from a cost point of view. Fuel cycle cost benefits could result if a number of reactors were to utilize fuel elements with the same number or different numbers of the same standard fuel plate. Data are presented to quantify these potential cost benefits. This analysis shows that there are a number of fuel element designs using LEU oxide or silicide fuels that have either the same or lower total fuel cycle costs than the HEU design. Use of these fuels with the uranium densities considered requires that they are successfully demonstrated and licensed

  7. A CASKCOM: A cask life cycle cost model

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    CASKCOM (cask cost model) is a computerized model which calculates the life cycle costs (LCC) associated with specific transportation cask designs and discounts those costs, if the user so chooses, to a net present value. The model has been used to help analyze and compare the life cycle economics of burnup credit and nonburnup credit cask designs being considered as conditions for a new generation of spent fuel transportation casks. CASKCOM is parametric in the sense that its input data can be easily changed in order to analyze and compare the life cycle cost implications arising from alternative assumptions. The input data themselves are organized into two main groupings. The first grouping comprises a set of data which is independent of cask design. This first grouping does not change from the analysis of one cask design to another. The second grouping of data is specific to each individual cask design. This second grouping thus changes each time a new cask design is analyzed

  8. Life cycle inventory and external costs of the gas fuel cycle. An overview of the main results and a brief comparison with other fuels

    International Nuclear Information System (INIS)

    Torfs, R.; De Nocker, L.; Wouters, G.

    1999-01-01

    In the context of a research project funded by the Belgian electricity utilities Electrabel/SPE, VITO made a life cycle inventory of the primary energy use and airborne emissions (including greenhouse gases, SO2 and NOx) of different fuels. Consequently, the impacts of these pollutants on human health, manmade and the natural environment are quantified and these impacts are valued in monetary terms. This analysis is based on the European ExternE methodology to estimate the external costs of energy. The LCI and external cost analysis confirm clearly that natural gas is a relative clean fossil fuel cycle. External cost are in the range of 1.2 to 2.6 EUROcent /kWh, which roughly corresponds from 30 % to 80 % of the private production costs. These results are introduced into a software module, which allows the utilities to compare economic costs and environmental benefits of different measures to reduce CO2 emissions. (author)

  9. Software cost estimation

    NARCIS (Netherlands)

    Heemstra, F.J.

    1992-01-01

    The paper gives an overview of the state of the art of software cost estimation (SCE). The main questions to be answered in the paper are: (1) What are the reasons for overruns of budgets and planned durations? (2) What are the prerequisites for estimating? (3) How can software development effort be

  10. Software cost estimation

    NARCIS (Netherlands)

    Heemstra, F.J.; Heemstra, F.J.

    1993-01-01

    The paper gives an overview of the state of the art of software cost estimation (SCE). The main questions to be answered in the paper are: (1) What are the reasons for overruns of budgets and planned durations? (2) What are the prerequisites for estimating? (3) How can software development effort be

  11. Computerized cost estimation spreadsheet and cost data base for fusion devices

    International Nuclear Information System (INIS)

    Hamilton, W.R.; Rothe, K.E.

    1985-01-01

    An automated approach to performing and cataloging cost estimates has been developed at the Fusion Engineering Design Center (FEDC), wherein the cost estimate record is stored in the LOTUS 1-2-3 spreadsheet on an IBM personal computer. The cost estimation spreadsheet is based on the cost coefficient/cost algorithm approach and incorporates a detailed generic code of cost accounts for both tokamak and tandem mirror devices. Component design parameters (weight, surface area, etc.) and cost factors are input, and direct and indirect costs are calculated. The cost data base file derived from actual cost experience within the fusion community and refined to be compatible with the spreadsheet costing approach is a catalog of cost coefficients, algorithms, and component costs arranged into data modules corresponding to specific components and/or subsystems. Each data module contains engineering, equipment, and installation labor cost data for different configurations and types of the specific component or subsystem. This paper describes the assumptions, definitions, methodology, and architecture incorporated in the development of the cost estimation spreadsheet and cost data base, along with the type of input required and the output format

  12. Life-cycle cost assessment of optimally designed reinforced concrete buildings under seismic actions

    International Nuclear Information System (INIS)

    Mitropoulou, Chara Ch.; Lagaros, Nikos D.; Papadrakakis, Manolis

    2011-01-01

    Life-cycle cost analysis (LCCA) is an assessment tool for studying the performance of systems in many fields of engineering. In earthquake engineering LCCA demands the calculation of the cost components that are related to the performance of the structure in multiple earthquake hazard levels. Incremental static and dynamic analyses are two procedures that can be used for estimating the seismic capacity of a structural system and can therefore be incorporated into the LCCA methodology. In this work the effect of the analysis procedure, the number of seismic records imposed, the performance criterion used and the structural type (regular or irregular) is investigated, on the life-cycle cost analysis of 3D reinforced concrete structures. Furthermore, the influence of uncertainties on the seismic response of structural systems and their impact on LCCA is examined. The uncertainty on the material properties, the cross-section dimensions and the record-incident angle is taking into account with the incorporation of the Latin hypercube sampling method into the incremental dynamic analysis procedure. In addition, the LCCA methodology is used as an assessment tool for the designs obtained by means of prescriptive and performance-based optimum design methodologies. The first one is obtained from a single-objective optimization problem, where the initial construction cost was the objective to be minimized, while the second one as a two-objective optimization problem where the life-cycle cost was the additional objective also to be minimized.

  13. Life-Cycle Cost Study for a Low-Level Radioactive Waste Disposal Facility in Texas

    International Nuclear Information System (INIS)

    Rogers, B.C.; Walter, P.L.; Baird, R.D.

    1999-01-01

    This report documents the life-cycle cost estimates for a proposed low-level radioactive waste disposal facility near Sierra Blanca, Texas. The work was requested by the Texas Low-Level Radioactive Waste Disposal Authority and performed by the National Low-Level Waste Management Program with the assistance of Rogers and Associates Engineering Corporation

  14. The process of life-cycle cost analysis on the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Chang, D.Y.; Jacoboski, J.A.; Fisher, L.A.; Beirne, P.J.

    1993-01-01

    The Estimating Services Department of the Fernald Environmental Restoration Management Corporation (FERMCO) is formalizing the process of life-cycle cost analysis (LCCA) for the Fernald Environmental Management Project (FEMP). The LCCA process is based on the concepts, principles, and guidelines described by applicable Department of Energy's (DOE) orders, pertinent published literature, and the National Bureau of Standards handbook 135. LCC analyses will be performed following a ten-step process on the FEMP at the earliest possible decision point to support the selection of the least-cost alternatives for achieving the FERMCO mission

  15. Burnup effect on nuclear fuel cycle cost using an equilibrium model

    International Nuclear Information System (INIS)

    Youn, S. R.; Kim, S. K.; Ko, W. I.

    2014-01-01

    The degree of fuel burnup is an important technical parameter to the nuclear fuel cycle, being sensitive and progressive to reduce the total volume of process flow materials and eventually cut the nuclear fuel cycle costs. This paper performed the sensitivity analysis of the total nuclear fuel cycle costs to changes in the technical parameter by varying the degree of burnups in each of the three nuclear fuel cycles using an equilibrium model. Important as burnup does, burnup effect was used among the cost drivers of fuel cycle, as the technical parameter. The fuel cycle options analyzed in this paper are three different fuel cycle options as follows: PWR-Once Through Cycle(PWR-OT), PWR-MOX Recycle, Pyro-SFR Recycle. These fuel cycles are most likely to be adopted in the foreseeable future. As a result of the sensitivity analysis on burnup effect of each three different nuclear fuel cycle costs, PWR-MOX turned out to be the most influenced by burnup changes. Next to PWR-MOX cycle, in the order of Pyro-SFR and PWR-OT cycle turned out to be influenced by the degree of burnup. In conclusion, the degree of burnup in the three nuclear fuel cycles can act as the controlling driver of nuclear fuel cycle costs due to a reduction in the volume of spent fuel leading better availability and capacity factors. However, the equilibrium model used in this paper has a limit that time-dependent material flow and cost calculation is impossible. Hence, comparative analysis of the results calculated by dynamic model hereafter and the calculation results using an equilibrium model should be proceed. Moving forward to the foreseeable future with increasing burnups, further studies regarding alternative material of high corrosion resistance fuel cladding for the overall

  16. Development of Advanced Life Cycle Costing Methods for Technology Benefit/Cost/Risk Assessment

    Science.gov (United States)

    Yackovetsky, Robert (Technical Monitor)

    2002-01-01

    The overall objective of this three-year grant is to provide NASA Langley's System Analysis Branch with improved affordability tools and methods based on probabilistic cost assessment techniques. In order to accomplish this objective, the Aerospace Systems Design Laboratory (ASDL) needs to pursue more detailed affordability, technology impact, and risk prediction methods and to demonstrate them on variety of advanced commercial transports. The affordability assessment, which is a cornerstone of ASDL methods, relies on the Aircraft Life Cycle Cost Analysis (ALCCA) program originally developed by NASA Ames Research Center and enhanced by ASDL. This grant proposed to improve ALCCA in support of the project objective by updating the research, design, test, and evaluation cost module, as well as the engine development cost module. Investigations into enhancements to ALCCA include improved engine development cost, process based costing, supportability cost, and system reliability with airline loss of revenue for system downtime. A probabilistic, stand-alone version of ALCCA/FLOPS will also be developed under this grant in order to capture the uncertainty involved in technology assessments. FLOPS (FLight Optimization System program) is an aircraft synthesis and sizing code developed by NASA Langley Research Center. This probabilistic version of the coupled program will be used within a Technology Impact Forecasting (TIF) method to determine what types of technologies would have to be infused in a system in order to meet customer requirements. A probabilistic analysis of the CER's (cost estimating relationships) within ALCCA will also be carried out under this contract in order to gain some insight as to the most influential costs and the impact that code fidelity could have on future RDS (Robust Design Simulation) studies.

  17. Nuclear fuel cycles : description, demand and supply estimates

    International Nuclear Information System (INIS)

    Gadallah, A.A.; Abou Zahra, A.A.; Hammad, F.H.

    1985-01-01

    This report deals with various nuclear fuel cycles description as well as the world demand and supply estimates of materials and services. Estimates of world nuclear fuel cycle requirements: nuclear fuel, heavy water and other fuel cycle services as well as the availability and production capabilities of these requirements, are discussed for several reactor fuel cycle strategies, different operating and under construction fuel cycle facilities in some industrialized and developed countries are surveyed. Various uncertainties and bottlenecks which are recently facing the development of some fuel cycle components are also discussed, as well as various proposals concerning fuel cycle back-end concepts. finally, the nuclear fuel cycles activities in some developing countries are reviewed with emphasis on the egyptian plans to introduce nuclear power in the country. 11 fig., 16 tab

  18. NASA Software Cost Estimation Model: An Analogy Based Estimation Model

    Science.gov (United States)

    Hihn, Jairus; Juster, Leora; Menzies, Tim; Mathew, George; Johnson, James

    2015-01-01

    The cost estimation of software development activities is increasingly critical for large scale integrated projects such as those at DOD and NASA especially as the software systems become larger and more complex. As an example MSL (Mars Scientific Laboratory) developed at the Jet Propulsion Laboratory launched with over 2 million lines of code making it the largest robotic spacecraft ever flown (Based on the size of the software). Software development activities are also notorious for their cost growth, with NASA flight software averaging over 50% cost growth. All across the agency, estimators and analysts are increasingly being tasked to develop reliable cost estimates in support of program planning and execution. While there has been extensive work on improving parametric methods there is very little focus on the use of models based on analogy and clustering algorithms. In this paper we summarize our findings on effort/cost model estimation and model development based on ten years of software effort estimation research using data mining and machine learning methods to develop estimation models based on analogy and clustering. The NASA Software Cost Model performance is evaluated by comparing it to COCOMO II, linear regression, and K-­ nearest neighbor prediction model performance on the same data set.

  19. Infrastructures and Life-Cycle Cost-Benefit Analysis

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    2012-01-01

    Design and maintenance of infrastructures using Life-Cycle Cost-Benefit analysis is discussed in this paper with special emphasis on users costs. This is for several infrastructures such as bridges, highways etc. of great importance. Repair or/and failure of infrastructures will usually result...

  20. Parametric cost estimation for space science missions

    Science.gov (United States)

    Lillie, Charles F.; Thompson, Bruce E.

    2008-07-01

    Cost estimation for space science missions is critically important in budgeting for successful missions. The process requires consideration of a number of parameters, where many of the values are only known to a limited accuracy. The results of cost estimation are not perfect, but must be calculated and compared with the estimates that the government uses for budgeting purposes. Uncertainties in the input parameters result from evolving requirements for missions that are typically the "first of a kind" with "state-of-the-art" instruments and new spacecraft and payload technologies that make it difficult to base estimates on the cost histories of previous missions. Even the cost of heritage avionics is uncertain due to parts obsolescence and the resulting redesign work. Through experience and use of industry best practices developed in participation with the Aerospace Industries Association (AIA), Northrop Grumman has developed a parametric modeling approach that can provide a reasonably accurate cost range and most probable cost for future space missions. During the initial mission phases, the approach uses mass- and powerbased cost estimating relationships (CER)'s developed with historical data from previous missions. In later mission phases, when the mission requirements are better defined, these estimates are updated with vendor's bids and "bottoms- up", "grass-roots" material and labor cost estimates based on detailed schedules and assigned tasks. In this paper we describe how we develop our CER's for parametric cost estimation and how they can be applied to estimate the costs for future space science missions like those presented to the Astronomy & Astrophysics Decadal Survey Study Committees.

  1. Food irradiation : estimates of cost of processing

    International Nuclear Information System (INIS)

    Krishnamurthy, K.; Bongirwar, D.R.

    1987-01-01

    For estimating the cost of food irradiation, three factors have to be taken into consideration. These are : (1) capital cost incurred on irradiation device and its installation, (2) recurring or running cost which includes maintenance cost and operational expenditure, and (3) product specific cost dependent on the factors specific to the food item to be processed, its storage, handling and distribution. A simple method is proposed to provide estimates of capital costs and running costs and it is applied to prepare a detailed estimate of costs for irradiation processing of onions and fish in India. The cost of processing onions worked out to be between Rs. 40 to 120 per 1000 Kg and for fish Rs 354 per 1000 Kg. These estimates do not take into account transparation costs and fluctuations in marketing procedures. (M.G.B.). 7 tables

  2. Evaluation of Externality Costs in Life-Cycle Optimization of Municipal Solid Waste Management Systems

    DEFF Research Database (Denmark)

    Martinez Sanchez, Veronica; Levis, James W.; Damgaard, Anders

    2017-01-01

    The development of sustainable solid waste management (SWM) systems requires consideration of both economic and environmental impacts. Societal life-cycle costing (S-LCC) provides a quantitative framework to estimate both economic and environmental impacts, by including "budget costs...... suburban U.S. county of 500 000 people generating 320 000 Mg of waste annually. Estimated externality costs are based on emissions of CO2, CH4, N2O, PM2.5, PM10, NOx, SO2, VOC, CO, NH3, Hg, Pb, Cd, Cr (VI), Ni, As, and dioxins. The results indicate that incorporating S-LCC into optimized SWM strategy...... development encourages the use of a mixed waste material recovery facility with residues going to incineration, and separated organics to anaerobic digestion. Results are sensitive to waste composition, energy mix and recycling rates. Most of the externality costs stem from SO2, NOx, PM2.5, CH4, fossil CO2...

  3. Cost Estimation and Control for Flight Systems

    Science.gov (United States)

    Hammond, Walter E.; Vanhook, Michael E. (Technical Monitor)

    2002-01-01

    Good program management practices, cost analysis, cost estimation, and cost control for aerospace flight systems are interrelated and depend upon each other. The best cost control process cannot overcome poor design or poor systems trades that lead to the wrong approach. The project needs robust Technical, Schedule, Cost, Risk, and Cost Risk practices before it can incorporate adequate Cost Control. Cost analysis both precedes and follows cost estimation -- the two are closely coupled with each other and with Risk analysis. Parametric cost estimating relationships and computerized models are most often used. NASA has learned some valuable lessons in controlling cost problems, and recommends use of a summary Project Manager's checklist as shown here.

  4. Life cycle cost analysis of single slope hybrid (PV/T) active solar still

    International Nuclear Information System (INIS)

    Kumar, Shiv; Tiwari, G.N.

    2009-01-01

    This paper presents the life cycle cost analysis of the single slope passive and hybrid photovoltaic (PV/T) active solar stills, based on the annual performance at 0.05 m water depth. Effects of various parameters, namely interest rate, life of the system and the maintenance cost have been taken into account. The comparative cost of distilled water produced from passive solar still (Rs. 0.70/kg) is found to be less than hybrid (PV/T) active solar still (Rs. 1.93/kg) for 30 years life time of the systems. The payback periods of the passive and hybrid (PV/T) active solar still are estimated to be in the range of 1.1-6.2 years and 3.3-23.9 years, respectively, based on selling price of distilled water in the range of Rs. 10/kg to Rs. 2/kg. The energy payback time (EPBT) has been estimated as 2.9 and 4.7 years, respectively. (author)

  5. Estimating the cost of a smoking employee.

    Science.gov (United States)

    Berman, Micah; Crane, Rob; Seiber, Eric; Munur, Mehmet

    2014-09-01

    We attempted to estimate the excess annual costs that a US private employer may attribute to employing an individual who smokes tobacco as compared to a non-smoking employee. Reviewing and synthesising previous literature estimating certain discrete costs associated with smoking employees, we developed a cost estimation approach that approximates the total of such costs for U.S. employers. We examined absenteeism, presenteesim, smoking breaks, healthcare costs and pension benefits for smokers. Our best estimate of the annual excess cost to employ a smoker is $5816. This estimate should be taken as a general indicator of the extent of excess costs, not as a predictive point value. Employees who smoke impose significant excess costs on private employers. The results of this study may help inform employer decisions about tobacco-related policies. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  6. Estimating Fuel Cycle Externalities: Analytical Methods and Issues, Report 2

    Energy Technology Data Exchange (ETDEWEB)

    Barnthouse, L.W.; Cada, G.F.; Cheng, M.-D.; Easterly, C.E.; Kroodsma, R.L.; Lee, R.; Shriner, D.S.; Tolbert, V.R.; Turner, R.S.

    1994-07-01

    The activities that produce electric power typically range from extracting and transporting a fuel, to its conversion into electric power, and finally to the disposition of residual by-products. This chain of activities is called a fuel cycle. A fuel cycle has emissions and other effects that result in unintended consequences. When these consequences affect third parties (i.e., those other than the producers and consumers of the fuel-cycle activity) in a way that is not reflected in the price of electricity, they are termed ''hidden'' social costs or externalities. They are the economic value of environmental, health and any other impacts, that the price of electricity does not reflect. How do you estimate the externalities of fuel cycles? Our previous report describes a methodological framework for doing so--called the damage function approach. This approach consists of five steps: (1) characterize the most important fuel cycle activities and their discharges, where importance is based on the expected magnitude of their externalities, (2) estimate the changes in pollutant concentrations or other effects of those activities, by modeling the dispersion and transformation of each pollutant, (3) calculate the impacts on ecosystems, human health, and any other resources of value (such as man-made structures), (4) translate the estimates of impacts into economic terms to estimate damages and benefits, and (5) assess the extent to which these damages and benefits are externalities, not reflected in the price of electricity. Each step requires a different set of equations, models and analysis. Analysts generally believe this to be the best approach for estimating externalities, but it has hardly been used! The reason is that it requires considerable analysis and calculation, and to this point in time, the necessary equations and models have not been assembled. Equally important, the process of identifying and estimating externalities leads to a number

  7. Sustainability Life Cycle Cost Analysis of Roof Waterproofing Methods Considering LCCO2

    Directory of Open Access Journals (Sweden)

    Sangyong Kim

    2013-12-01

    Full Text Available In a construction project, selection of an appropriate method in the planning/design stage is very important for ensuring effective project implementation and success. Many companies have adopted the life cycle cost (LCC method, one of the methods for analyzing economic efficiency, for appropriate decision-making in the basic/detailed design stage by estimating overall costs and expenses generated over the entire project. This paper presents an LCC method for calculating the LCC of CO2 (LCCO2, based on materials committed during the lifecycle of a structure for each roof waterproofing method and adding this cost to the LCC for comparative analysis. Thus, this technique presents the LCC that includes the cost of CO2 emission. The results show that in terms of initial construction cost, asphalt waterproofing had the highest CO2 emission cost, followed by sheet waterproofing. LCCO2 did not greatly influence the initial construction cost and maintenance cost, as it is relatively smaller than the LCC. However, when the number of durable years was changed, the LCC showed some changes.

  8. Development of computer software for pavement life cycle cost analysis.

    Science.gov (United States)

    1988-01-01

    The life cycle cost analysis program (LCCA) is designed to automate and standardize life cycle costing in Virginia. It allows the user to input information necessary for the analysis, and it then completes the calculations and produces a printed copy...

  9. Outer planet probe cost estimates: First impressions

    Science.gov (United States)

    Niehoff, J.

    1974-01-01

    An examination was made of early estimates of outer planetary atmospheric probe cost by comparing the estimates with past planetary projects. Of particular interest is identification of project elements which are likely cost drivers for future probe missions. Data are divided into two parts: first, the description of a cost model developed by SAI for the Planetary Programs Office of NASA, and second, use of this model and its data base to evaluate estimates of probe costs. Several observations are offered in conclusion regarding the credibility of current estimates and specific areas of the outer planet probe concept most vulnerable to cost escalation.

  10. Decommissioning Cost Estimating -The ''Price'' Approach

    International Nuclear Information System (INIS)

    Manning, R.; Gilmour, J.

    2002-01-01

    Over the past 9 years UKAEA has developed a formalized approach to decommissioning cost estimating. The estimating methodology and computer-based application are known collectively as the PRICE system. At the heart of the system is a database (the knowledge base) which holds resource demand data on a comprehensive range of decommissioning activities. This data is used in conjunction with project specific information (the quantities of specific components) to produce decommissioning cost estimates. PRICE is a dynamic cost-estimating tool, which can satisfy both strategic planning and project management needs. With a relatively limited analysis a basic PRICE estimate can be produced and used for the purposes of strategic planning. This same estimate can be enhanced and improved, primarily by the improvement of detail, to support sanction expenditure proposals, and also as a tender assessment and project management tool. The paper will: describe the principles of the PRICE estimating system; report on the experiences of applying the system to a wide range of projects from contaminated car parks to nuclear reactors; provide information on the performance of the system in relation to historic estimates, tender bids, and outturn costs

  11. Life-Cycle Cost-Benefit (LCCB) Analysis of Bridges from a User and Social Point of View

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    2009-01-01

    is to present and discuss some of these problems from a user and social point of view. A brief presentation of a preliminary study of the importance of including benefits in life-cycle cost-benefit analysis in management systems for bridges is shown. Benefits may be positive as well as negative from the user...... point of view. In the paper, negative benefits (user costs) are discussed in relation to the maintenance of concrete bridges. A limited number of excerpts from published reports that are related to the importance of estimating user costs when repairs of bridges are planned, and when optimized strategies......During the last two decades, important progress has been made in the life-cycle cost-benefit (LCCB) analysis of structures, especially offshore platforms, bridges and nuclear installations. Due to the large uncertainties related to the deterioration, maintenance, and benefits of such structures...

  12. Cost aspects of the research reactor fuel cycle

    International Nuclear Information System (INIS)

    2010-01-01

    Research reactors have made valuable contributions to the development of nuclear power, basic science, materials development, radioisotope production for medicine and industry, and education and training. In doing so, they have provided an invaluable service to humanity. Research reactors are expected to make important contributions in the coming decades to further development of the peaceful uses of nuclear technology, in particular for advanced nuclear fission reactors and fuel cycles, fusion, high energy physics, basic research, materials science, nuclear medicine, and biological sciences. However, in the context of decreased public sector support, research reactors are increasingly faced with financial constraints. It is therefore of great importance that their operations are based on a sound understanding of the costs of the complete research reactor fuel cycle, and that they are managed according to sound financial and economic principles. This publication is targeted at individuals and organizations involved with research reactor operations, with the aim of providing both information and an analytical framework for assessing and determining the cost structure of fuel cycle related activities. Efficient management of fuel cycle expenditures is an important component in developing strategies for sustainable future operation of a research reactor. The elements of the fuel cycle are presented with a description of how they can affect the cost efficient operation of a research reactor. A systematic review of fuel cycle choices is particularly important when a new reactor is being planned or when an existing reactor is facing major changes in its fuel cycle structure, for example because of conversion of the core from high enriched uranium (HEU) to low enriched uranium (LEU) fuel, or the changes in spent fuel management provision. Review and optimization of fuel cycle issues is also recommended for existing research reactors, even in cases where research reactor

  13. Composite Aircraft Life Cycle Cost Estimating Model

    Science.gov (United States)

    2011-03-01

    X. The masked fit of the lines are as follows: • Part Count Percentage Reduction for Design hours ( HRE %) = • Part Count Percentage Reduction...multiplied by the respective labor rate (LR). Currently, CT is a percentage of total non- recurring development cost. HRE corresponds to recurring...Empty Weight Velocity RENGR HRE CRE 46 Figure 14: Non-Recurring Engineering CER Currently, CT is a percentage of non-recurring development

  14. Towards Greater Harmonisation of Decommissioning Cost Estimates

    International Nuclear Information System (INIS)

    O'Sullivan, Patrick; ); Laraia, Michele; ); LaGuardia, Thomas S.

    2010-01-01

    The NEA Decommissioning Cost Estimation Group (DCEG), in collaboration with the IAEA Waste Technology Section and the EC Directorate-General for Energy and Transport, has recently studied cost estimation practices in 12 countries - Belgium, Canada, France, Germany, Italy, Japan, the Netherlands, Slovakia, Spain, Sweden, the United Kingdom and the United States. Its findings are to be published in an OECD/NEA report entitled Cost Estimation for Decommissioning: An International Overview of Cost Elements, Estimation Practices and Reporting Requirements. This booklet highlights the findings contained in the full report. (authors)

  15. Life Cycle Costing: An Introduction

    DEFF Research Database (Denmark)

    Rödger, Jan-Markus; Kjær, Louise Laumann; Pagoropoulos, Aris

    2018-01-01

    The chapter gives an introduction to life cycle costing (LCC) and how it can be used to support decision-making. It can form the economic pillar in a full life cycle sustainability assessment, but often system delimitations differ depending on the goal and scope of the study. To provide a profound...... as well as guidance on how to collect data to overcome this hurdle. In an illustrative case study on window frames, the eLCC theory is applied and demonstrated with each step along the eLCC procedure described in detail. A final section about advanced LCC introduces how to monetarise externalities and how...

  16. Life-cycle analysis and external costs in transportation

    International Nuclear Information System (INIS)

    Delucchi, M.A.

    2002-01-01

    The assessment of greenhouse gas impacts in the US shows that against a baseline gasoline vehicle, the impact of including the full fuel cycle generally reduces the relative advantages of alternative transportation fuels. While a switch to diesel is estimated to save 30% as compared to gasoline, the savings from natural gas/LPG are (around 20%), for ethanol from corn (8%) and for battery electricity vehicles using power from coal (6%) are much smaller. This is largely due to the use of LCA rather than end-use comparisons. However, the results also show that there would be large savings from the use of ethanol from fuel cells using methanol (39%) or natural gas (50%), while ethanol from wood in a conventional engine appears to have the greatest savings (63%). In external costs of motor vehicle use, analysis results were presented for both air pollution and energy security impacts (including SPR, military expenditures, macro-economic costs and pecuniary costs) as well as water pollution, noise and congestion impacts. The results suggest that externalities amount to 1.2 US cents per mile travelled in gasoline powered vehicle. The most significant externality is related to air pollution. Costs associated with US defence, the SPR, and climate change are quite insignificant. The only other variable of significance is the impact on the economy, through the transfer of wealth outside the US (referred to as 'pecuniary externality') and the oil price shock impacts on the economy. A comparison of external costs and subsidies for different transportation modes in the US (gas or electric cars, transit bus, light rail, heavy rail) showed that subsidies available to public transit system greatly outweigh the benefit in reduced externalities avoided. In the comparison of social costs of transportation alternatives, differences in external cost, while not trivial, are outweighed by the differences in direct costs or in subsidies. (author)

  17. Life cycle costs for Alaska bridges.

    Science.gov (United States)

    2014-08-01

    A study was implemented to assist the Alaska Department of Transportation and Public Facilities (ADOT&PF) with life cycle costs for : the Alaska Highway Bridge Inventory. The study consisted of two parts. Part 1 involved working with regional offices...

  18. Fuel cycle cost study with HEU and LEU fuels

    International Nuclear Information System (INIS)

    Matos, J.E.; Freese, K.E.

    1984-01-01

    Fuel cycle costs are compared for a range of 235 U loadings with HEU and LEU fuels using the IAEA generic 10 MW reactor as an example. If LEU silicide fuels are successfully demonstrated and licensed, the results indicate that total fuel cycle costs can be about the same or lower than those with the HEU fuels that are currently used in most research reactors

  19. Preliminary cost estimating for the nuclear industry

    International Nuclear Information System (INIS)

    Klumpar, I.V.; Soltz, K.M.

    1985-01-01

    The nuclear industry has higher costs for personnel, equipment, construction, and engineering than conventional industry, which means that cost estimation procedures may need adjustment. The authors account for the special technical and labor requirements of the nuclear industry in making adjustments to equipment and installation cost estimations. Using illustrative examples, they show that conventional methods of preliminary cost estimation are flexible enough for application to emerging industries if their cost structure is similar to that of the process industries. If not, modifications can provide enough engineering and cost data for a statistical analysis. 9 references, 14 figures, 4 tables

  20. Error Cost Escalation Through the Project Life Cycle

    Science.gov (United States)

    Stecklein, Jonette M.; Dabney, Jim; Dick, Brandon; Haskins, Bill; Lovell, Randy; Moroney, Gregory

    2004-01-01

    It is well known that the costs to fix errors increase as the project matures, but how fast do those costs build? A study was performed to determine the relative cost of fixing errors discovered during various phases of a project life cycle. This study used three approaches to determine the relative costs: the bottom-up cost method, the total cost breakdown method, and the top-down hypothetical project method. The approaches and results described in this paper presume development of a hardware/software system having project characteristics similar to those used in the development of a large, complex spacecraft, a military aircraft, or a small communications satellite. The results show the degree to which costs escalate, as errors are discovered and fixed at later and later phases in the project life cycle. If the cost of fixing a requirements error discovered during the requirements phase is defined to be 1 unit, the cost to fix that error if found during the design phase increases to 3 - 8 units; at the manufacturing/build phase, the cost to fix the error is 7 - 16 units; at the integration and test phase, the cost to fix the error becomes 21 - 78 units; and at the operations phase, the cost to fix the requirements error ranged from 29 units to more than 1500 units

  1. Modern Estimates of Global Water Cycle Fluxes

    Science.gov (United States)

    Rodell, M.; Beaudoing, H. K.; L'Ecuyer, T. S.; Olson, W. S.

    2014-12-01

    The goal of the first phase of the NASA Energy and Water Cycle Study (NEWS) Water and Energy Cycle Climatology project was to develop "state of the global water cycle" and "state of the global energy cycle" assessments based on data from modern ground and space based observing systems and data integrating models. Here we describe results of the water cycle assessment, including mean annual and monthly fluxes over continents and ocean basins during the first decade of the millennium. To the extent possible, the water flux estimates are based on (1) satellite measurements and (2) data-integrating models. A careful accounting of uncertainty in each flux was applied within a routine that enforced multiple water and energy budget constraints simultaneously in a variational framework, in order to produce objectively-determined, optimized estimates. Simultaneous closure of the water and energy budgets caused the ocean evaporation and precipitation terms to increase by about 10% and 5% relative to the original estimates, mainly because the energy budget required turbulent heat fluxes to be substantially larger in order to balance net radiation. In the majority of cases, the observed annual, surface and atmospheric water budgets over the continents and oceans close with much less than 10% residual. Observed residuals and optimized uncertainty estimates are considerably larger for monthly surface and atmospheric water budget closure, often nearing or exceeding 20% in North America, Eurasia, Australia and neighboring islands, and the Arctic and South Atlantic Oceans. The residuals in South America and Africa tend to be smaller, possibly because cold land processes are a non-issue. Fluxes are poorly observed over the Arctic Ocean, certain seas, Antarctica, and the Australasian and Indonesian Islands, leading to reliance on atmospheric analysis estimates. Other details of the study and future directions will be discussed.

  2. Cost estimating for large nuclear projects

    International Nuclear Information System (INIS)

    Duggal, A.; Hunt, M.

    2004-01-01

    In today's market, the generation of electricity is a very competitive business, which is constantly under the watchful eye of the media and public. Nuclear power faces a lot of competition from other sources such as hydro, coal and gas. Controlling costs, monitoring costs, feedback, industry knowledge and up to date cost estimating tools are essential for a nuclear company to compete on a long term basis. This paper reviews the terminology and estimating principles used for the construction of new nuclear plants, lifetime operating costs, and the costs associated with refurbishment work. (author)

  3. Software Cost-Estimation Model

    Science.gov (United States)

    Tausworthe, R. C.

    1985-01-01

    Software Cost Estimation Model SOFTCOST provides automated resource and schedule model for software development. Combines several cost models found in open literature into one comprehensive set of algorithms. Compensates for nearly fifty implementation factors relative to size of task, inherited baseline, organizational and system environment and difficulty of task.

  4. Estimating the costs of AECB regulation

    International Nuclear Information System (INIS)

    1981-04-01

    A comprehensive analysis of the costs to the Canadian nuclear industry of the present Atomic Energy Control Board regulatory activities was carried out to provide a framework for a socio-economic impact analysis of AECB regulations. Regulaory costs in uranium mining and milling, fuel fabrication, power generation, the nuclear fuel cycle as a whole, and radioisotope use are studied. The cost of safety measures which industry would still undertake in the absence of government regulations ('prudent operator' costs) are not included. (L.L.)

  5. Calculation Of Recycle And Open Cycle Nuclear Fuel Cost Using Lagistase Method

    International Nuclear Information System (INIS)

    Djoko Birmano, Moch

    2002-01-01

    . To be presented the calculation of recycle and open cycle nuclear fuel cost for LWR type that have net power of 600 MWe. This calculation using LEGECOST method developed by IAEA which have characteristics,where i.e. money is stated in constant money (no inflation),discount rate is equalized with interest rate and not consider tax and depreciation.As a conclusion is that open cycle nuclear fuel cost more advantage because it is cheaper than recycle nuclear fuel cost. This is caused that at present, reprocessing process disadvantage because it has not found yet more efficient and cheaper method, besides price of fresh uranium is still cheap. In future, the cost of recycle nuclear fuel cycle will be more competitive toward the cost of open nuclear fuel cycle if is found technology of reprocessing process that more advance, efficient and cheap. Increase of Pu use for reactor fuel especially MOX type will rise Pu price that finally will decrease the cost of recycle nuclear fuel cycle

  6. Procedure for estimating permanent total enclosure costs

    Energy Technology Data Exchange (ETDEWEB)

    Lukey, M.E.; Prasad, C.; Toothman, D.A.; Kaplan, N.

    1999-07-01

    Industries that use add-on control devices must adequately capture emissions before delivering them to the control device. One way to capture emissions is to use permanent total enclosures (PTEs). By definition, an enclosure which meets the US Environmental Protection Agency's five-point criteria is a PTE and has a capture efficiency of 100%. Since costs play an important role in regulatory development, in selection of control equipment, and in control technology evaluations for permitting purposes, EPA has developed a Control Cost Manual for estimating costs of various items of control equipment. EPA's Manual does not contain any methodology for estimating PTE costs. In order to assist environmental regulators and potential users of PTEs, a methodology for estimating PTE costs was developed under contract with EPA, by Pacific Environmental Services, Inc. (PES) and is the subject of this paper. The methodology for estimating PTE costs follows the approach used for other control devices in the Manual. It includes procedures for sizing various components of a PTE and for estimating capital as well as annual costs. It contains verification procedures for demonstrating compliance with EPA's five-point criteria. In addition, procedures are included to determine compliance with Occupational Safety and Health Administration (OSHA) standards. Meeting these standards is an important factor in properly designing PTEs. The methodology is encoded in Microsoft Exel spreadsheets to facilitate cost estimation and PTE verification. Examples are given throughout the methodology development and in the spreadsheets to illustrate the PTE design, verification, and cost estimation procedures.

  7. Procedure for estimating permanent total enclosure costs

    Energy Technology Data Exchange (ETDEWEB)

    Lukey, M E; Prasad, C; Toothman, D A; Kaplan, N

    1999-07-01

    Industries that use add-on control devices must adequately capture emissions before delivering them to the control device. One way to capture emissions is to use permanent total enclosures (PTEs). By definition, an enclosure which meets the US Environmental Protection Agency's five-point criteria is a PTE and has a capture efficiency of 100%. Since costs play an important role in regulatory development, in selection of control equipment, and in control technology evaluations for permitting purposes, EPA has developed a Control Cost Manual for estimating costs of various items of control equipment. EPA's Manual does not contain any methodology for estimating PTE costs. In order to assist environmental regulators and potential users of PTEs, a methodology for estimating PTE costs was developed under contract with EPA, by Pacific Environmental Services, Inc. (PES) and is the subject of this paper. The methodology for estimating PTE costs follows the approach used for other control devices in the Manual. It includes procedures for sizing various components of a PTE and for estimating capital as well as annual costs. It contains verification procedures for demonstrating compliance with EPA's five-point criteria. In addition, procedures are included to determine compliance with Occupational Safety and Health Administration (OSHA) standards. Meeting these standards is an important factor in properly designing PTEs. The methodology is encoded in Microsoft Exel spreadsheets to facilitate cost estimation and PTE verification. Examples are given throughout the methodology development and in the spreadsheets to illustrate the PTE design, verification, and cost estimation procedures.

  8. 28 CFR 100.16 - Cost estimate submission.

    Science.gov (United States)

    2010-07-01

    ..., quantity, and cost. (ii) Direct labor. Provide a time-phased (e.g., monthly, quarterly) breakdown of labor... estimates. (iii) Allocable direct costs. Indicate how allocable costs are computed and applied, including... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Cost estimate submission. 100.16 Section...

  9. Evaluation of pavement life cycle cost analysis: Review and analysis

    Directory of Open Access Journals (Sweden)

    Peyman Babashamsi

    2016-07-01

    Full Text Available The cost of road construction consists of design expenses, material extraction, construction equipment, maintenance and rehabilitation strategies, and operations over the entire service life. An economic analysis process known as Life-Cycle Cost Analysis (LCCA is used to evaluate the cost-efficiency of alternatives based on the Net Present Value (NPV concept. It is essential to evaluate the above-mentioned cost aspects in order to obtain optimum pavement life-cycle costs. However, pavement managers are often unable to consider each important element that may be required for performing future maintenance tasks. Over the last few decades, several approaches have been developed by agencies and institutions for pavement Life-Cycle Cost Analysis (LCCA. While the transportation community has increasingly been utilising LCCA as an essential practice, several organisations have even designed computer programs for their LCCA approaches in order to assist with the analysis. Current LCCA methods are analysed and LCCA software is introduced in this article. Subsequently, a list of economic indicators is provided along with their substantial components. Collecting previous literature will help highlight and study the weakest aspects so as to mitigate the shortcomings of existing LCCA methods and processes. LCCA research will become more robust if improvements are made, facilitating private industries and government agencies to accomplish their economic aims. Keywords: Life-Cycle Cost Analysis (LCCA, Pavement management, LCCA software, Net Present Value (NPV

  10. Life Cycle Costs in Education: Operations & Maintenance Considered.

    Science.gov (United States)

    Moussatche, Helena; Languell-Urquhart, Jennifer; Woodson, Carol

    2000-01-01

    Discusses life cycle cost analysis when deciding on flooring finishes and examines operations and maintenance cost effectiveness relative to hard, resilient, and soft flooring. A chart of evaluated flooring materials' characteristics, appropriate maintenance procedures, and recommended frequency is included. (GR)

  11. EVALUATING THE LIFE CYCLE COSTS OF PLANT ASSETS – A MULTIDIMENSIONAL VIEW

    Directory of Open Access Journals (Sweden)

    Markus Gram

    2012-11-01

    Full Text Available This paper shows the results of the task group "Asset life cycle management" of the AustrianScientific Maintenance and Asset Management Association (ÖVIA. One purpose of the researchactivities is to create a generic life cycle model for physical assets which includes all costs in everyphase of the asset life cycle. The first step is a literature review determining the most established lifecycle cost models. This is the input for discussing the completeness of such frameworks with theparticipating industrial companies. A general model is deducted from existing approaches and thedetermined costs are evaluated with respect to priority and practical relevance. The result of theevaluation shows which costs are taken into account for investment decisions. Another outcome ofthe study is the verification of importance of the proposed costs for industrial companies, especiallyfor the process industry. The derived life cycle cost framework is the basis for developing a calculationtool and subsequently, for further research in the flied of uncertainty-based methodologies forlife cycle cost analyzing of physical plant assets.

  12. Nuclear plant life cycle costs

    International Nuclear Information System (INIS)

    Durante, R.W.

    1994-01-01

    Life cycle costs of nuclear power plants in the United States are discussed. The author argues that these costs have been mishandled or neglected. Decommissioning costs have escalated, e.g. from $328 per unit in 1991 to $370 in 1993 for the Sacramento Municipal Utility District, though they still only amount to less than 0.1 cent per kWh. Waste management has been complicated in the U.S. by the decision to abandon civilian reprocessing; by the year 2000, roughly 30 U.S. nuclear power units will have filled their storage pools; dry storage has been delayed, and will be an expense not originally envisaged. Some examples of costs of major component replacement are provided. No single component has caused as much operational disruption and financial penalties as the steam generator. Operation and maintenance costs have increased steadily, and now amount to more than 70% of production costs. A strategic plan by the Nuclear Power Oversight Committee (of U.S. utilities) will ensure that the ability to correctly operate and maintain a nuclear power plant is built into the original design. 6 figs

  13. Comparative Life-Cycle Cost Analysis Of Solar Photovoltaic Power ...

    African Journals Online (AJOL)

    Comparative Life-Cycle Cost Analysis Of Solar Photovoltaic Power System And Diesel Generator System For Remote Residential Application In Nigeria. ... like capital cost, and diesel fuel costs are varied. The results show the photovoltaic system to be more cost-effective at low-power ranges of electrical energy supply.

  14. Process-based Cost Estimation for Ramjet/Scramjet Engines

    Science.gov (United States)

    Singh, Brijendra; Torres, Felix; Nesman, Miles; Reynolds, John

    2003-01-01

    Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.

  15. COST ESTIMATING RELATIONSHIPS IN ONSHORE DRILLING PROJECTS

    Directory of Open Access Journals (Sweden)

    Ricardo de Melo e Silva Accioly

    2017-03-01

    Full Text Available Cost estimating relationships (CERs are very important tools in the planning phases of an upstream project. CERs are, in general, multiple regression models developed to estimate the cost of a particular item or scope of a project. They are based in historical data that should pass through a normalization process before fitting a model. In the early phases they are the primary tool for cost estimating. In later phases they are usually used as an estimation validation tool and sometimes for benchmarking purposes. As in any other modeling methodology there are number of important steps to build a model. In this paper the process of building a CER to estimate drilling cost of onshore wells will be addressed.

  16. The external cost of the nuclear fuel cycle

    International Nuclear Information System (INIS)

    Schieber, C.; Schneider, T.

    2002-01-01

    The external cost of the nuclear fuel cycle has been evaluated in the particular context of France as part of the European Commission's ExternE project. All the steps in the fuel cycle which involve the use of cutting edge technology were taken into consideration, from mining of uranium ores to waste disposal, via construction, dismantling of nuclear power plants and the transport of radioactive materials. The general methodology adopted in the study, known as the 'Impact Pathway Analysis', is based on a sequence of evaluations from source terms to the potential= effects on man and the environment, and then to their monetary evaluation, using a single framework devised for all the fuel cycles considered in the ExternE project. The resulting external cost is in the range of 2 to 3 mEuro/kWh when no discount rate is applied, and around 0.1 mEuro/kWh when a discount rate of 3% is considered. Further developments have been made on the external cost of a nuclear accident and on the integration of risk aversion in its evaluation. It appeared that the external cost of a nuclear accident would be about 0.04 mEuro/kWh, instead of 0.002 mEuro/kWh without taking risk aversion into account. (authors)

  17. Handbook for quick cost estimates. A method for developing quick approximate estimates of costs for generic actions for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Ball, J.R.

    1986-04-01

    This document is a supplement to a ''Handbook for Cost Estimating'' (NUREG/CR-3971) and provides specific guidance for developing ''quick'' approximate estimates of the cost of implementing generic regulatory requirements for nuclear power plants. A method is presented for relating the known construction costs for new nuclear power plants (as contained in the Energy Economic Data Base) to the cost of performing similar work, on a back-fit basis, at existing plants. Cost factors are presented to account for variations in such important cost areas as construction labor productivity, engineering and quality assurance, replacement energy, reworking of existing features, and regional variations in the cost of materials and labor. Other cost categories addressed in this handbook include those for changes in plant operating personnel and plant documents, licensee costs, NRC costs, and costs for other government agencies. Data sheets, worksheets, and appropriate cost algorithms are included to guide the user through preparation of rough estimates. A sample estimate is prepared using the method and the estimating tools provided.

  18. Handbook for quick cost estimates. A method for developing quick approximate estimates of costs for generic actions for nuclear power plants

    International Nuclear Information System (INIS)

    Ball, J.R.

    1986-04-01

    This document is a supplement to a ''Handbook for Cost Estimating'' (NUREG/CR-3971) and provides specific guidance for developing ''quick'' approximate estimates of the cost of implementing generic regulatory requirements for nuclear power plants. A method is presented for relating the known construction costs for new nuclear power plants (as contained in the Energy Economic Data Base) to the cost of performing similar work, on a back-fit basis, at existing plants. Cost factors are presented to account for variations in such important cost areas as construction labor productivity, engineering and quality assurance, replacement energy, reworking of existing features, and regional variations in the cost of materials and labor. Other cost categories addressed in this handbook include those for changes in plant operating personnel and plant documents, licensee costs, NRC costs, and costs for other government agencies. Data sheets, worksheets, and appropriate cost algorithms are included to guide the user through preparation of rough estimates. A sample estimate is prepared using the method and the estimating tools provided

  19. Analysis of Reliability Estimations and Spares Protection Levels on Life Cycle Costs of the Marine Corps H-1 Upgrades Program

    National Research Council Canada - National Science Library

    Thompson, David

    2004-01-01

    .... This will be accomplished through the integration of factors impacting spare parts levels and Life Cycle Costs into a spreadsheet model that will establish the appropriate relationship between the factors...

  20. Analysis of the total system life cycle cost for the Civilian Radioactive Waste Management Program

    International Nuclear Information System (INIS)

    1989-05-01

    The total-system life-cycle cost (TSLCC) analysis for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program is an ongoing activity that helps determine whether the revenue-producing mechanism established by the Nuclear Waste Policy Act of 1982 -- a fee levied on electricity generated in commercial nuclear power plants -- is sufficient to cover the cost of the program. This report provides cost estimates for the sixth annual evaluation of the adequacy of the fee and is consistent with the program strategy and plans contained in the DOE's Draft 1988 Mission Plan Amendment. The total-system cost for the system with a repository at Yucca Mountain, Nevada, a facility for monitored retrievable storage (MRS), and a transportation system is estimated at $24 billion (expressed in constant 1988 dollars). In the event that a second repository is required and is authorized by the Congress, the total-system cost is estimated at $31 to $33 billion, depending on the quantity of spent fuel to be disposed of. The $7 billion cost savings for the single-repository system in comparison with the two-repository system is due to the elimination of $3 billion for second-repository development and $7 billion for the second-repository facility. These savings are offset by $2 billion in additional costs at the first repository and $1 billion in combined higher costs for the MRS facility and transportation. 55 refs., 2 figs., 24 tabs

  1. Fuel cycle cost comparisons with oxide and silicide fuels

    Energy Technology Data Exchange (ETDEWEB)

    Matos, J E; Freese, K E [RERTR Program, Argonne National Laboratory (United States)

    1983-09-01

    This paper addresses fuel cycle cost comparisons for a generic 10 MW reactor with HEU aluminide fuel and with LEU oxide and silicide fuels in several fuel element geometries. The intention of this study is to provide a consistent assessment of various design options from a cost point of view. The status of the development and demonstration of the oxide and silicide fuels are presented in several papers in these proceedings. Routine utilization of these fuels with the uranium densities considered here requires that they are successfully demonstrated and licensed. Thermal-hydraulic safety margins, shutdown margins, mixed cores, and transient analyses are not addressed here, but analyses of these safety issues are in progress for a limited number of the most promising design options. Fuel cycle cost benefits could result if a number of reactors were to utilize fuel elements with the same number or different numbers of the same standard fuel plate. Data is presented to quantify these potential cost benefits. This analysis shows that there are a number of fuel element designs using LEU oxide or silicide fuels that have either the same or lower total fuel cycle costs than the HEU design. Use of these fuels with the uranium densities considered requires that they are successfully demonstrated and licensed. All safety criteria for the reactor with these fuel element designs need to be satisfied as well. With LEU oxide fuel, 31 g U/cm{sup 3} 1 and 0.76 mm--thick fuel meat, elements with 18-22 plates 320-391 g {sup 235}U) result in the same or lower total costs than with the HEU element 23 plates, 280 g {sup 235}U). Higher LEU loadings (more plates per element) are needed for larger excess reactivity requirements. However, there is little cost advantage to using more than 20 of these plates per element. Increasing the fuel meat thickness from 0.76 mm to 1.0 mm with 3.1 g U/cm{sup 3} in the design with 20 plates per element could result in significant cost reductions if the

  2. The impact of carbon prices on generation-cycling costs

    International Nuclear Information System (INIS)

    Denny, Eleanor; O'Malley, Mark

    2009-01-01

    The introduction of mechanisms aimed at reducing greenhouse gas emissions can have a serious impact on electricity system costs. A carbon mechanism that forces generators to internalise their emissions costs may alter the merit order in which generators are dispatched in the market. Heavy carbon dioxide polluters may switch from operating continuously to having to operate on the margin more often. This results in these units being required to switch on and off and vary their output more frequently, which has a significant impact on their costs. In this paper, the impact of carbon prices on the operating profiles of generators in a real electricity system is investigated. A large number of potential scenarios are considered and it is found that carbon prices significantly increase the cycling costs. These increased cycling costs significantly offset the carbon dioxide reduction benefits of the carbon price

  3. Assuring Software Cost Estimates: Is it an Oxymoron?

    Science.gov (United States)

    Hihn, Jarius; Tregre, Grant

    2013-01-01

    The software industry repeatedly observes cost growth of well over 100% even after decades of cost estimation research and well-known best practices, so "What's the problem?" In this paper we will provide an overview of the current state oj software cost estimation best practice. We then explore whether applying some of the methods used in software assurance might improve the quality of software cost estimates. This paper especially focuses on issues associated with model calibration, estimate review, and the development and documentation of estimates as part alan integrated plan.

  4. Solid rocket motor cost model

    Science.gov (United States)

    Harney, A. G.; Raphael, L.; Warren, S.; Yakura, J. K.

    1972-01-01

    A systematic and standardized procedure for estimating life cycle costs of solid rocket motor booster configurations. The model consists of clearly defined cost categories and appropriate cost equations in which cost is related to program and hardware parameters. Cost estimating relationships are generally based on analogous experience. In this model the experience drawn on is from estimates prepared by the study contractors. Contractors' estimates are derived by means of engineering estimates for some predetermined level of detail of the SRM hardware and program functions of the system life cycle. This method is frequently referred to as bottom-up. A parametric cost analysis is a useful technique when rapid estimates are required. This is particularly true during the planning stages of a system when hardware designs and program definition are conceptual and constantly changing as the selection process, which includes cost comparisons or trade-offs, is performed. The use of cost estimating relationships also facilitates the performance of cost sensitivity studies in which relative and comparable cost comparisons are significant.

  5. Estimating externalities of coal fuel cycles. Report No. 3 on the external costs and benefits of fuel cycles: a study by the US Department of Energy and the Commission of the European Communities

    International Nuclear Information System (INIS)

    1994-09-01

    The report, one of a series of eight reports, is primarily about a methodology for estimating coal fuel cycle externalities. The study considered the stages of a typical coal fuel cycle and identified the more important ones: coal mining coal transportation, and electric power generation. Chapter headings are: introduction; alternative contexts for the study; prior studies of damages and benefits; methods development; organization, interpretation and use of results; reference technology and sites; priority impact-pathways for the coal fuel cycle; estimating the externalities of coal mining; estimating coal transportation externalities; estimating-the externalities of electric power generation; tabulation of numerical results; and fundings, conclusions, and recommendations. The study demonstrated the application of the damage function approach to estimating the externalities of coal fuel cycles. A number of analytical methods were applied within that framework to several impact-pathways. 580 refs., 40 figs., 130 tabs., 3 apps

  6. Life cycle cost analysis of alternative vehicles and fuels in Thailand

    International Nuclear Information System (INIS)

    Goedecke, Martin; Therdthianwong, Supaporn; Gheewala, Shabbir H.

    2007-01-01

    High crude oil prices and pollution problems have drawn attention to alternative vehicle technologies and fuels for the transportation sector. The question is: What are the benefits/costs of these technologies for society? To answer this question in a quantitative way, a web-based model (http://vehiclesandfuels.memebot.com) has been developed to calculate the societal life cycle costs, the consumer life cycle costs and the tax for different vehicle technologies. By comparing these costs it is possible to draw conclusions about the social benefit and the related tax structure. The model should help to guide decisions toward optimality, which refers to maximum social benefit. The model was applied to the case of Thailand. The life cycle cost of 13 different alternative vehicle technologies in Thailand have been calculated and the tax structure analyzed

  7. Cost estimation of a standalone photovoltaic power system in remote areas of Sarawak, Malaysia

    International Nuclear Information System (INIS)

    Jakhrani, A.Q.; Othman, A.K.; Rigit, A.R.H.; Samo, S.R.

    2012-01-01

    This paper aims to estimate the anticipated costs incurred from a standalone solar photovoltaic power system for the supply of electricity to the rural community in Sarawak, Malaysia. The life cycle cost analysis with net present value technique was employed for the evaluation of cost system. It was found that purchasing of solar photovoltaic components and the system installation cost will contribute 63% of the total investment and future anticipated costs will add to the remaining. Recurring cost will make 25% and components replacements 75% of future anticipated costs. It was discovered that the power generated from the solar photovoltaic system would be 38 times more expensive than electricity produced from the conventional sources. However, its installation in remote areas could be favourable where the grid-connected power supply is not accessible. (author)

  8. Collider Scaling and Cost Estimation

    International Nuclear Information System (INIS)

    Palmer, R.B.

    1986-01-01

    This paper deals with collider cost and scaling. The main points of the discussion are the following ones: 1) scaling laws and cost estimation: accelerating gradient requirements, total stored RF energy considerations, peak power consideration, average power consumption; 2) cost optimization; 3) Bremsstrahlung considerations; 4) Focusing optics: conventional, laser focusing or super disruption. 13 refs

  9. Addressing Uncertainties in Cost Estimates for Decommissioning Nuclear Facilities

    International Nuclear Information System (INIS)

    Benjamin, Serge; Descures, Sylvain; Du Pasquier, Louis; Francois, Patrice; Buonarotti, Stefano; Mariotti, Giovanni; Tarakonov, Jurij; Daniska, Vladimir; Bergh, Niklas; Carroll, Simon; AaSTRoeM, Annika; Cato, Anna; De La Gardie, Fredrik; Haenggi, Hannes; Rodriguez, Jose; Laird, Alastair; Ridpath, Andy; La Guardia, Thomas; O'Sullivan, Patrick; ); Weber, Inge; )

    2017-01-01

    The cost estimation process of decommissioning nuclear facilities has continued to evolve in recent years, with a general trend towards demonstrating greater levels of detail in the estimate and more explicit consideration of uncertainties, the latter of which may have an impact on decommissioning project costs. The 2012 report on the International Structure for Decommissioning Costing (ISDC) of Nuclear Installations, a joint recommendation by the Nuclear Energy Agency (NEA), the International Atomic Energy Agency (IAEA) and the European Commission, proposes a standardised structure of cost items for decommissioning projects that can be used either directly for the production of cost estimates or for mapping of cost items for benchmarking purposes. The ISDC, however, provides only limited guidance on the treatment of uncertainty when preparing cost estimates. Addressing Uncertainties in Cost Estimates for Decommissioning Nuclear Facilities, prepared jointly by the NEA and IAEA, is intended to complement the ISDC, assisting cost estimators and reviewers in systematically addressing uncertainties in decommissioning cost estimates. Based on experiences gained in participating countries and projects, the report describes how uncertainty and risks can be analysed and incorporated in decommissioning cost estimates, while presenting the outcomes in a transparent manner

  10. Costs of regulatory compliance: categories and estimating techniques

    International Nuclear Information System (INIS)

    Schulte, S.C.; McDonald, C.L.; Wood, M.T.; Cole, R.M.; Hauschulz, K.

    1978-10-01

    Use of the categorization scheme and cost estimating approaches presented in this report can make cost estimates of regulation required compliance activities of value to policy makers. The report describes a uniform assessment framework that when used would assure that cost studies are generated on an equivalent basis. Such normalization would make comparisons of different compliance activity cost estimates more meaningful, thus enabling the relative merits of different regulatory options to be more effectively judged. The framework establishes uniform cost reporting accounts and cost estimating approaches for use in assessing the costs of complying with regulatory actions. The framework was specifically developed for use in a current study at Pacific Northwest Laboratory. However, use of the procedures for other applications is also appropriate

  11. An Analytical Cost Estimation Procedure

    National Research Council Canada - National Science Library

    Jayachandran, Toke

    1999-01-01

    Analytical procedures that can be used to do a sensitivity analysis of a cost estimate, and to perform tradeoffs to identify input values that can reduce the total cost of a project, are described in the report...

  12. REFCO83, Nuclear Fuel Cycle Cost Economics Using Discounted Cash Flow Analysis

    International Nuclear Information System (INIS)

    Delene, J.G.; Hermann, O.W.

    2001-01-01

    1 - Description of program or function: REFCO83 utilizes a discounted cash flow (DCF) analysis procedure to calculate batch, cycle, and lifetime levelized average nuclear fuel cycle costs. The DCF analysis establishes an energy 'cost' associated with the fuel by requiring that the revenues from the sale of energy be adequate to pay the required return on outstanding capital, to pay all expenses including taxes, and to retire the outstanding investment to zero by the end of the economic life of the set of fuel investments. The program uses reactor mass flow information together with individual fuel cost parameters and utility capital structure and money costs to calculate levelized costs cumulatively through any batch or cycle. 2 - Method of solution: A fuel cycle cost component is considered to be any fuel material purchase, processing cost, or discharge material credit in the complete fuel cycle. The costs for each individual component, i.e. uranium, enrichment, etc., may either be expensed or capitalized for tax purposes or, in the case of waste disposal, the cost may also be made proportional to power production. To properly account for the effect of income taxes, all calculations in REFCO83 are done using 'then' current dollars, including price escalations caused by inflation. The database used for the default values for REFCO83 was taken from the Nuclear Energy Cost Data Base. 3 - Restrictions on the complexity of the problem: The maximum number of fuel batches is 120

  13. Estimating boiling water reactor decommissioning costs. A user's manual for the BWR Cost Estimating Computer Program (CECP) software: Draft report for comment

    International Nuclear Information System (INIS)

    Bierschbach, M.C.

    1994-12-01

    With the issuance of the Decommissioning Rule (July 27, 1988), nuclear power plant licensees are required to submit to the U.S. Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. This user's manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personal computer, provides estimates for the cost of decommissioning BWR power stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning

  14. Estimation of optimal educational cost per medical student.

    Science.gov (United States)

    Yang, Eunbae B; Lee, Seunghee

    2009-09-01

    This study aims to estimate the optimal educational cost per medical student. A private medical college in Seoul was targeted by the study, and its 2006 learning environment and data from the 2003~2006 budget and settlement were carefully analyzed. Through interviews with 3 medical professors and 2 experts in the economics of education, the study attempted to establish the educational cost estimation model, which yields an empirically computed estimate of the optimal cost per student in medical college. The estimation model was based primarily upon the educational cost which consisted of direct educational costs (47.25%), support costs (36.44%), fixed asset purchases (11.18%) and costs for student affairs (5.14%). These results indicate that the optimal cost per student is approximately 20,367,000 won each semester; thus, training a doctor costs 162,936,000 won over 4 years. Consequently, we inferred that the tuition levels of a local medical college or professional medical graduate school cover one quarter or one-half of the per- student cost. The findings of this study do not necessarily imply an increase in medical college tuition; the estimation of the per-student cost for training to be a doctor is one matter, and the issue of who should bear this burden is another. For further study, we should consider the college type and its location for general application of the estimation method, in addition to living expenses and opportunity costs.

  15. The cost analysis of hydrogen life cycle in China

    International Nuclear Information System (INIS)

    Yao, Fei; Jia, Yuan; Mao, Zongqiang

    2010-01-01

    Currently, the increasing price of oil and the possibility of global energy crisis demand for substitutive energy to replace fossil energy. Many kinds of renewable energy have been considered, such as hydrogen, solar energy, and wind energy. Many countries including China have their own plan to support the research of hydrogen, because of its premier features. But, at present, the cost of hydrogen energy production, storage and transportation process is higher than that of fossil energy and its commercialization progress is slow. Life cycle cost analysis (LCCA) was used in this paper to evaluate the cost of hydrogen energy throughout the life cycle focused on the stratagem selection, to demonstrate the costs of every step and to discuss their relationship. Finally, the minimum cost program is as follows: natural gas steam reforming - high-pressure hydrogen bottles transported by car to hydrogen filling stations - hydrogen internal-combustion engines. (author)

  16. Residential outage cost estimation: Hong Kong

    International Nuclear Information System (INIS)

    Woo, C.K.; Ho, T.; Shiu, A.; Cheng, Y.S.; Horowitz, I.; Wang, J.

    2014-01-01

    Hong Kong has almost perfect electricity reliability, the result of substantial investments ultimately financed by electricity consumers who may be willing to accept lower reliability in exchange for lower bills. But consumers with high outage costs are likely to reject the reliability reduction. Our ordered-logit regression analysis of the responses by 1876 households to a telephone survey conducted in June 2013 indicates that Hong Kong residents exhibit a statistically-significant preference for their existing service reliability and rate. Moreover, the average residential cost estimate for a 1-h outage is US$45 (HK$350), topping the estimates reported in 10 of the 11 studies published in the last 10 years. The policy implication is that absent additional compelling evidence, Hong Kong should not reduce its service reliability. - Highlights: • Use a contingent valuation survey to obtain residential preferences for reliability. • Use an ordered logit analysis to estimate Hong Kong's residential outage costs. • Find high outage cost estimates that imply high reliability requirements. • Conclude that sans new evidence, Hong Kong should not reduce its reliability

  17. Heat exchanger inventory cost optimization for power cycles with one feedwater heater

    International Nuclear Information System (INIS)

    Qureshi, Bilal Ahmed; Antar, Mohamed A.; Zubair, Syed M.

    2014-01-01

    Highlights: • Cost optimization of heat exchanger inventory in power cycles is investigated. • Analysis for an endoreversible power cycle with an open feedwater heater is shown. • Different constraints on the power cycle are investigated. • The constant heat addition scenario resulted in the lowest value of the cost function. - Abstract: Cost optimization of heat exchanger inventory in power cycles with one open feedwater heater is undertaken. In this regard, thermoeconomic analysis for an endoreversible power cycle with an open feedwater heater is shown. The scenarios of constant heat rejection and addition rates, power as well as rate of heat transfer in the open feedwater heater are studied. All cost functions displayed minima with respect to the high-side absolute temperature ratio (θ 1 ). In this case, the effect of the Carnot temperature ratio (Φ 1 ), absolute temperature ratio (ξ) and the phase-change absolute temperature ratio for the feedwater heater (Φ 2 ) are qualitatively the same. Furthermore, the constant heat addition scenario resulted in the lowest value of the cost function. For variation of all cost functions, the smaller the value of the phase-change absolute temperature ratio for the feedwater heater (Φ 2 ), lower the cost at the minima. As feedwater heater to hot end unit cost ratio decreases, the minimum total conductance required increases

  18. Establishing a cost model when estimating product cost in early design phases

    OpenAIRE

    Jeppsson, Johanna; Sjöberg, Jessica

    2017-01-01

    About 75% of the total product cost is determined in the early design phase, which means that the possibilities to affect costs are relatively small when the design phase is completed. For companies, it is therefore vital to conduct reliable cost estimates in the early design phase, when selecting between different design choices. When conducting a cost estimate there are many uncertainties. The aim with this study is therefore to explore how uncertainties regarding product cost can be consid...

  19. Life cycle costs for the domestic reactor-based plutonium disposition option

    International Nuclear Information System (INIS)

    Williams, K.A.

    1999-01-01

    Projected constant dollar life cycle cost (LCC) estimates are presented for the domestic reactor-based plutonium disposition program being managed by the US Department of Energy Office of Fissile Materials Disposition (DOE/MD). The scope of the LCC estimate includes: design, construction, licensing, operation, and deactivation of a mixed-oxide (MOX) fuel fabrication facility (FFF) that will be used to purify and convert weapons-derived plutonium oxides to MOX fuel pellets and fabricate MOX fuel bundles for use in commercial pressurized-water reactors (PWRs); fuel qualification activities and modification of facilities required for manufacture of lead assemblies that will be used to qualify and license this MOX fuel; and modification, licensing, and operation of commercial PWRs to allow irradiation of a partial core of MOX fuel in combination with low-enriched uranium fuel. The baseline cost elements used for this document are the same as those used for examination of the preferred sites described in the site-specific final environmental impact statement and in the DOE Record of Decision that will follow in late 1999. Cost data are separated by facilities, government accounting categories, contract phases, and expenditures anticipated by the various organizations who will participate in the program over a 20-year period. Total LCCs to DOE/MD are projected at approximately $1.4 billion for a 33-MT plutonium disposition mission

  20. A fuel cycle cost study with HEU and LEU fuels

    International Nuclear Information System (INIS)

    Matos, J.E.; Freese, K.E.

    1985-01-01

    Fuel cycle costs are compared for a range of 235 U loadings with HEU and LEU fuels using the IAEA generic 10 MW reactor as an example. If LEU silicide fuels are successfully demonstrated and licensed, the results indicate that total fuel cycle costs can be about the same or lower than those with the HEU fuels that are currently used in most research reactors. (author)

  1. A fuel cycle cost study with HEU and LEU fuels

    Energy Technology Data Exchange (ETDEWEB)

    Matos, J E; Freese, K E [Argonne National Laboratory, Argonne, IL (United States)

    1985-07-01

    Fuel cycle costs are compared for a range of {sup 235}U loadings with HEU and LEU fuels using the IAEA generic 10 MW reactor as an example. If LEU silicide fuels are successfully demonstrated and licensed, the results indicate that total fuel cycle costs can be about the same or lower than those with the HEU fuels that are currently used in most research reactors. (author)

  2. 10 CFR 455.64 - Life-cycle cost methodology.

    Science.gov (United States)

    2010-01-01

    ...-investment ratio is the ratio of the present value of net cost savings attributable to an energy conservation measure to the present value of the net increase in investment, maintenance and operating, and replacement... present value. The format for displaying life-cycle costs shall be a savings-to-investment ratio. (b) An...

  3. Guidelines for estimating nuclear power plant decommissioning costs

    International Nuclear Information System (INIS)

    LaGuardia, T.S.; Williams, D.H.

    1989-01-01

    The objectives of the study were: (1) To develop guidelines to facilitate estimating the cost of nuclear power plant decommissioning alternatives on a plant-specific basis and to facilitate comparing estimates made by others. The guidelines are expressed in a form that could be readily adapted by technical specialists from individual utilities or by other uses. (2) To enhance the industry's credibility with decision-makes at the state and federal levels during rate/regulatory processes involving decommissioning costs. This is accomplished by providing a detailed, systematic breakdown of how decommissioning cost estimates are prepared. (3) To increase the validity, realism, and accuracy of site-specific decommissioning cost estimates. This is accomplished by pulling together the experiences and practices of several nuclear utilities and consultants in conducting past decommissioning cost estimates

  4. Life-cycle cost analysis of energy efficiency design options for residential furnaces and boilers

    International Nuclear Information System (INIS)

    Lutz, James; Lekov, Alex; Chan, Peter; Whitehead, Camilla Dunham; Meyers, Steve; McMahon, James

    2006-01-01

    In 2001, the US Department of Energy (DOE) initiated a rulemaking process to consider whether to amend the existing energy efficiency standards for furnaces and boilers. A key factor in DOE's consideration of new standards is the economic impacts on consumers of possible revisions to energy-efficiency standards. Determining cost-effectiveness requires an appropriate comparison of the additional first cost of energy efficiency design options with the savings in operating costs. DOE's preferred approach involves comparing the total life-cycle cost (LCC) of owning and operating a more efficient appliance with the LCC for a baseline design. This study describes the method used to conduct the LCC analysis and presents the estimated change in LCC associated with more energy-efficient equipment. The results indicate that efficiency improvement relative to the baseline design can reduce the LCC in each of the product classes considered

  5. Cost analysis and estimating tools and techniques

    CERN Document Server

    Nussbaum, Daniel

    1990-01-01

    Changes in production processes reflect the technological advances permeat­ ing our products and services. U. S. industry is modernizing and automating. In parallel, direct labor is fading as the primary cost driver while engineering and technology related cost elements loom ever larger. Traditional, labor-based ap­ proaches to estimating costs are losing their relevance. Old methods require aug­ mentation with new estimating tools and techniques that capture the emerging environment. This volume represents one of many responses to this challenge by the cost analysis profession. The Institute of Cost Analysis (lCA) is dedicated to improving the effective­ ness of cost and price analysis and enhancing the professional competence of its members. We encourage and promote exchange of research findings and appli­ cations between the academic community and cost professionals in industry and government. The 1990 National Meeting in Los Angeles, jointly spo~sored by ICA and the National Estimating Society (NES),...

  6. The cost of Alzheimer's disease in China and re-estimation of costs worldwide.

    Science.gov (United States)

    Jia, Jianping; Wei, Cuibai; Chen, Shuoqi; Li, Fangyu; Tang, Yi; Qin, Wei; Zhao, Lina; Jin, Hongmei; Xu, Hui; Wang, Fen; Zhou, Aihong; Zuo, Xiumei; Wu, Liyong; Han, Ying; Han, Yue; Huang, Liyuan; Wang, Qi; Li, Dan; Chu, Changbiao; Shi, Lu; Gong, Min; Du, Yifeng; Zhang, Jiewen; Zhang, Junjian; Zhou, Chunkui; Lv, Jihui; Lv, Yang; Xie, Haiqun; Ji, Yong; Li, Fang; Yu, Enyan; Luo, Benyan; Wang, Yanjiang; Yang, Shanshan; Qu, Qiumin; Guo, Qihao; Liang, Furu; Zhang, Jintao; Tan, Lan; Shen, Lu; Zhang, Kunnan; Zhang, Jinbiao; Peng, Dantao; Tang, Muni; Lv, Peiyuan; Fang, Boyan; Chu, Lan; Jia, Longfei; Gauthier, Serge

    2018-04-01

    The socioeconomic costs of Alzheimer's disease (AD) in China and its impact on global economic burden remain uncertain. We collected data from 3098 patients with AD in 81 representative centers across China and estimated AD costs for individual patient and total patients in China in 2015. Based on this data, we re-estimated the worldwide costs of AD. The annual socioeconomic cost per patient was US $19,144.36, and total costs were US $167.74 billion in 2015. The annual total costs are predicted to reach US $507.49 billion in 2030 and US $1.89 trillion in 2050. Based on our results, the global estimates of costs for dementia were US $957.56 billion in 2015, and will be US $2.54 trillion in 2030, and US $9.12 trillion in 2050, much more than the predictions by the World Alzheimer Report 2015. China bears a heavy burden of AD costs, which greatly change the estimates of AD cost worldwide. Copyright © 2017 the Alzheimer's Association. Published by Elsevier Inc. All rights reserved.

  7. An integrated approach to calculate life cycle costs of arms and military equipment

    Directory of Open Access Journals (Sweden)

    Vlada S. Sokolović

    2013-12-01

    , costs are one of the most dominant parameters in decision-making. Modern trends in this area comprehensively perceive all costs during the life cycle of assets.In general, in the analysis of costs in the life cycle of AME there are two sets of costs: visible and invisible (hidden costs. The visible part of the costs is mainly present in decision-making and usually includes the cost of equipping units or purchase of assets. The invisible part of the costs is far more significant. Although it is larger than the visible part and covers more groups of costs, decision-makers often do not take it into account. The hidden costs include: distribution costs, operating costs, maintenance costs, training costs, inventory costs, information systems costs, the cost of disposal and write-offs, etc. The decision making problem about investment in the AME purchase and equipping is obviously of  multicriteria nature, whether an optimum combination of costs for one  technical system (AME is in question, or whether it is a choice of a system of AME among many offered. COST ANALYSIS OF A PARTICULAR  ASSET For the illustration of an integrated approach to the analysis of the cost of assets in their life-cycle, a model from the US Naval Postgraduate School, was adjusted and applied on an example of a real asset. The model is applied to the case of two  squadrons of identical aircraft based at different airports. With regard to the availability, confidentiality, and the variability of costs and reliability of the elements of AME, the calculations in the model are implemented on the basis of the estimated or orientation parameters. Essentially, the goal is to demonstrate the interdependence, mutual relations and influences of parameters and their ultimate impact on the overall cost of military assets. Applying the model to a particular example points to the fact that, in the first years of asset life, the dominant cost is that of asset procurement (cost of acquisition, cost of assets

  8. Estimating the costs of human space exploration

    Science.gov (United States)

    Mandell, Humboldt C., Jr.

    1994-01-01

    The plan for NASA's new exploration initiative has the following strategic themes: (1) incremental, logical evolutionary development; (2) economic viability; and (3) excellence in management. The cost estimation process is involved with all of these themes and they are completely dependent upon the engineering cost estimator for success. The purpose is to articulate the issues associated with beginning this major new government initiative, to show how NASA intends to resolve them, and finally to demonstrate the vital importance of a leadership role by the cost estimation community.

  9. Investigation into life-cycle costing as a comparative analysis approach of energy systems

    CSIR Research Space (South Africa)

    Mokheseng, B

    2010-08-31

    Full Text Available selection based on a simple payback period. Due to life-cycle stages, often the real costs of the project or equipment, either to the decision maker or the cost bearer, are not reflected by the upfront capital costs. In this paper, the life-cycle costing...

  10. Computer Software for Life Cycle Cost.

    Science.gov (United States)

    1987-04-01

    34 111. 1111I .25 IL4 jj 16 MICROCOPY RESOLUTION TEST CHART hut FILE C AIR CoMMNAMN STFF COLLG STUJDET PORTO i COMpUTER SOFTWARE FOR LIFE CYCLE CO879...obsolete), physical life (utility before physically wearing out), or application life (utility in a given function)." (7:5) The costs are usually

  11. Handbook for cost estimating. A method for developing estimates of costs for generic actions for nuclear power plants

    International Nuclear Information System (INIS)

    Ball, J.R.; Cohen, S.; Ziegler, E.Z.

    1984-10-01

    This document provides overall guidance to assist the NRC in preparing the types of cost estimates required by the Regulatory Analysis Guidelines and to assist in the assignment of priorities in resolving generic safety issues. The Handbook presents an overall cost model that allows the cost analyst to develop a chronological series of activities needed to implement a specific regulatory requirement throughout all applicable commercial LWR power plants and to identify the significant cost elements for each activity. References to available cost data are provided along with rules of thumb and cost factors to assist in evaluating each cost element. A suitable code-of-accounts data base is presented to assist in organizing and aggregating costs. Rudimentary cost analysis methods are described to allow the analyst to produce a constant-dollar, lifetime cost for the requirement. A step-by-step example cost estimate is included to demonstrate the overall use of the Handbook

  12. Development of geological disposal system; localization of element cost data and cost evaluation on the HLW repository

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Byung Sik; Kim, Kil Jung; Yang, Young Jin; Kim, Sung Chun [KOPEC, Taejeon (Korea)

    2002-03-01

    To estimate Total Life Cycle Cost (TSLCC) for Korea HLW Repository through localization of element cost data, we review and re-organize each basic element cost data for reference repository system, localize various element cost and finally estimate TSLCC considering economic parameters. As results of the study, TSLCC is estimated as 17,167,689 million won, which includes costs for site preparation, surface facilities, underground facilities and management/integration. Since HLW repository Project is an early stage of pre-conceptual design at present, the information of design and project information are not enough to perform cost estimate and cost localization for the Project. However, project cost structure is re-organized based on the local condition and Total System Life Cycle Cost is estimated using the previous cost data gathered from construction experience of the local nuclear power plant. Project results can be used as basic reference data to assume total construction cost for the local HLW repository and should be revised to more reliable cost data with incorporating detail project design information into the cost estimate in a future. 20 refs. (Author)

  13. Nuclear shipping and waste disposal cost estimates

    International Nuclear Information System (INIS)

    Hudson, C.R. II.

    1977-11-01

    Cost estimates for the shipping of spent fuel from the reactor, shipping of waste from the reprocessing plant, and disposal of reprocessing plant wastes have been made for five reactor types. The reactors considered are the light-water reactor (LWR), the mixed-oxide-fueled light-water reactor (MOX), the Canadian deuterium-uranium reactor (CANDU), the fast breeder reactor (FBR), and the high-temperature gas-cooled reactor (HTGR). In addition to the cost estimates, this report provides details on the bases and assumptions used to develop the cost estimates

  14. Increased accuracy of cost-estimation using product configuration systems

    DEFF Research Database (Denmark)

    Rasmussen, Jeppe Bredahl; Hvam, Lars; Mortensen, Niels Henrik

    This article describes an approach for utilizing Product Configuration Systems (PCS) for quantifying project costs in project-based companies. It presents a case study demonstrating a method of quantifying costs in a way that makes it possible to configure cost- and time estimates. Piecework costs......, material costs and sub-supplier costs are used as principle cost elements and linked to structural and process elements to facilitate configuration. The cost data are used by the PCS to generate fast and accurate cost-estimates, quotations, time estimates and cost summaries. The described cost...... quantification principles have been used in a Scandinavian SME (Small and Medium-sized Enterprise) since the 90’s, but have since 2011 been adopted to be used in a configuration system. A longitudinal case study was conducted to compare cost and time-estimation accuracy before and after implementation. We...

  15. Quantifying Cost Risk Early in the Life Cycle

    International Nuclear Information System (INIS)

    Mar, B.

    2004-01-01

    A new method for analyzing life cycle cost risk on large programs is presented that responds to an increased emphasis on improving sustainability for long-term programs. This method provides better long-term risk assessment and risk management techniques. It combines standard Monte Carlo analysis of risk drivers and a new data-driven method developed by the BMDO. The approach permits quantification of risks throughout the entire life cycle without resorting to difficult to support subjective methods. The BMDO methodology is shown to be relatively straightforward to apply to a specific component or process within a project using standard technical risk assessment methods. The total impact on system is obtained using the program WBS, which allows for the capture of correlated risks shared by multiple WBS items. Once the correlations and individual component risks are captured, a Monte Carlo simulation can be run using a modeling tool such as ANALYTICA to produce the overall life cycle cost risk

  16. Study Of The Fuel Cycle Effect To The Electricity Generating Cost

    International Nuclear Information System (INIS)

    Salimy, D. H.

    1998-01-01

    The nuclear fuel cycle cost contributes relatively small fraction to the total nuclear power generation cost, I.e. about 15 to 30%, compared to the fuel cost in the coal-generated electricity (40-60%). Or in the oil-generated electricity (70-80%). This situation will give effect that the future generation cost is much less sensitive to the changes in the fuel prince than in the case of fossil fuel power plants. The study has shown that by assuming a 100% increase in the natural uranium price, the total nuclear fuel cycle cost would increase only by about 27% and in turn it contributes about 29% increase to the total nuclear fuel cycle cost. As a result, it contributes only 4 to 8% increase in the nuclear energy generation cost. As a comparison, if the same situation should occur to fossil fuel plants, the assumed fuel price increase would have increased the electricity generating cost by about 40-65% for coal-fired plants, and about 70-85% for oil-fired plants. This study also has assesses the economic aspects of the electricity generating cots for nuclear power plant (NPP) and the coal power plant. For an NPP the most affecting factor is the investment cost, while for the coal power plant, the major factor influencing the total cost is the price/cost of the fuel

  17. Waste management facilities cost information: System cost model product description. Revision 2

    International Nuclear Information System (INIS)

    Lundeen, A.S.; Hsu, K.M.; Shropshire, D.E.

    1996-02-01

    In May of 1994, Lockheed Idaho Technologies Company (LITCO) in Idaho Falls, Idaho and subcontractors developed the System Cost Model (SCM) application. The SCM estimates life-cycle costs of the entire US Department of Energy (DOE) complex for designing; constructing; operating; and decommissioning treatment, storage, and disposal (TSD) facilities for mixed low-level, low-level, transuranic, and mixed transuranic waste. The SCM uses parametric cost functions to estimate life-cycle costs for various treatment, storage, and disposal modules which reflect planned and existing facilities at DOE installations. In addition, SCM can model new facilities based on capacity needs over the program life cycle. The SCM also provides transportation costs for DOE wastes. Transportation costs are provided for truck and rail and include transport of contact-handled, remote-handled, and alpha (transuranic) wastes. The user can provide input data (default data is included in the SCM) including the volume and nature of waste to be managed, the time period over which the waste is to be managed, and the configuration of the waste management complex (i.e., where each installation's generated waste will be treated, stored, and disposed). Then the SCM uses parametric cost equations to estimate the costs of pre-operations (designing), construction costs, operation management, and decommissioning these waste management facilities

  18. Life cycle costing with a discount rate

    Science.gov (United States)

    Posner, E. C.

    1978-01-01

    This article studies life cycle costing for a capability needed for the indefinite future, and specifically investigates the dependence of optimal policies on the discount rate chosen. The two costs considered are reprocurement cost and maintenance and operations (M and O) cost. The procurement price is assumed known, and the M and O costs are assumed to be a known function, in fact, a non-decreasing function, of the time since last reprocurement. The problem is to choose the optimum reprocurement time so as to minimize the quotient of the total cost over a reprocurement period divided by the period. Or one could assume a discount rate and try to minimize the total discounted costs into the indefinite future. It is shown that the optimum policy in the presence of a small discount rate hardly depends on the discount rate at all, and leads to essentially the same policy as in the case in which discounting is not considered.

  19. Econometric estimation of country-specific hospital costs

    Directory of Open Access Journals (Sweden)

    Murray Christopher JL

    2003-02-01

    Full Text Available Abstract Information on the unit cost of inpatient and outpatient care is an essential element for costing, budgeting and economic-evaluation exercises. Many countries lack reliable estimates, however. WHO has recently undertaken an extensive effort to collect and collate data on the unit cost of hospitals and health centres from as many countries as possible; so far, data have been assembled from 49 countries, for various years during the period 1973–2000. The database covers a total of 2173 country-years of observations. Large gaps remain, however, particularly for developing countries. Although the long-term solution is that all countries perform their own costing studies, the question arises whether it is possible to predict unit costs for different countries in a standardized way for short-term use. The purpose of the work described in this paper, a modelling exercise, was to use the data collected across countries to predict unit costs in countries for which data are not yet available, with the appropriate uncertainty intervals. The model presented here forms part of a series of models used to estimate unit costs for the WHO-CHOICE project. The methods and the results of the model, however, may be used to predict a number of different types of country-specific unit costs, depending on the purpose of the exercise. They may be used, for instance, to estimate the costs per bed-day at different capacity levels; the "hotel" component of cost per bed-day; or unit costs net of particular components such as drugs. In addition to reporting estimates for selected countries, the paper shows that unit costs of hospitals vary within countries, sometimes by an order of magnitude. Basing cost-effectiveness studies or budgeting exercises on the results of a study of a single facility, or even a small group of facilities, is likely to be misleading.

  20. Measuring the environmental benefits of hydrogen transportation fuel cycles under uncertainty about external costs

    International Nuclear Information System (INIS)

    Chernyavs'ka, Liliya; Gulli, Francesco

    2010-01-01

    In this paper, we attempt to measure the environmental benefits of hydrogen deployment in the transportation sector. We compare the hydrogen pathways to the conventional transportation fuel cycles in terms of external costs, estimated using the results of the most accurate methodologies available in this field. The central values of performed analysis bring us ambiguous results. The external cost of the best conventional solution ('oil to diesel hybrid internal-combustion engine') in some cases is just higher and in others just lower than that of the best fossil fuel to hydrogen solution ('natural gas to hydrogen fuel cell'). Nevertheless, by accounting for the uncertainty about external costs, we are able to remove this ambiguity highlighting that the hydrogen pathway provides significant environmental benefits ,especially in densely populated areas, assuming 100% city driving.

  1. A decision-making framework for effective maintenance management using life cycle costing (LCC in a rolling stock environment

    Directory of Open Access Journals (Sweden)

    Fourie, Cornelius Jacobus

    2016-12-01

    Full Text Available In this paper, a life cycle costing (LCC framework for effective maintenance management is investigated and developed for use in a railway rolling stock environment. The framework consists of combining typical mission-critical components together with their failure and maintenance history. All costs related to the operation and maintenance of these components throughout their life cycle are also determined. The next step involves considering different scenarios under which the components can be used in relation to operations, maintenance, and replacements. The decision about which scenario to take is based on the one with the most favourable net present value after life cycle costing is performed over a specified period of time. A typical railway rolling-stock maintenance organisation in South Africa was used to highlight the practical implications of such a framework and how the company could make informed and appropriate decisions. The conclusion of this study is that such a framework is useful, and that it can be used as a basis for estimating LCC across a spectrum of critical assets found in the rolling stock environment.

  2. sensitivity analysis on flexible road pavement life cycle cost model

    African Journals Online (AJOL)

    user

    of sensitivity analysis on a developed flexible pavement life cycle cost model using varying discount rate. The study .... organizations and specific projects needs based. Life-cycle ... developed and completed urban road infrastructure corridor ...

  3. Survey of life-cycle costs of glass-paper HEPA filters

    International Nuclear Information System (INIS)

    Moore, P.; Bergman, W.; Gilbert, H.

    1992-08-01

    We have conducted a survey of the major users of glass-paper HEPA filters in the DOE complex to ascertain the life cycle costs of these filters. Purchase price of the filters is only a minor portion of the costs; the major expenditures are incurred during the removal and disposal of contaminated filters. Through personal interviews, site visits and completion of questionnaires, we have determined the costs associated with the use of HEPA filters in the DOE complex. The total approximate life-cycle cost for a standard (2 in. x 2 in. x 1 in.) glass-paper HEPA filter is $3,000 for one considered low-level waste (LLW), $11,780 for transuranic (TRU) and $15,000 for high-level waste (HLW). The weighted-average cost for a standard HEPA filter in the complex is $4,753

  4. Life-cycle cost analysis of energy efficiency design options for residential furnaces and boilers

    Energy Technology Data Exchange (ETDEWEB)

    Lutz, J.; Lekov, A.; Chan, P.; Dunham Whitehead, C.; Meyers, S.; McMahon, J. [Lawrence Berkeley National Laboratory, Berkeley, CA (United States). Environmental Energy Technologies Div.

    2006-03-01

    In 2001, the US Department of Energy (DOE) initiated a rulemaking process to consider whether to amend the existing energy efficiency standards for furnaces and boilers. A key factor in DOE's consideration of new standards is the economic impacts on consumers of possible revisions to energy-efficiency standards. Determining cost-effectiveness requires an appropriate comparison of the additional first cost of energy efficiency design options with the savings in operating costs. DOE's preferred approach involves comparing the total life-cycle cost (LCC) of owning and operating a more efficient appliance with the LCC for a baseline design. This study describes the method used to conduct the LCC analysis and presents the estimated change in LCC associated with more energy-efficient equipment. The results indicate that efficiency improvement relative to the baseline design can reduce the LCC in each of the product classes considered. (author)

  5. Life cycle assessment of renewables: present issues, future outlook and implications for the calculation of external costs

    International Nuclear Information System (INIS)

    Frankl, P.

    2002-01-01

    In principle, Life Cycle Assessment (LCA) is certainly appropriate for estimating external costs of renewables, since major environmental impacts of the latter are generated in phases of the life cycle other than use. In practice however, several issues still remain. They are related to the availability and quality of Life Cycle Inventory (LCI) data, to the frit technological development of renewable energy technologies (RET), to the existence of many different applications of the latter and to a strong dependency on local conditions. Moreover, a 'static' picture of present technologies is not enough for policy indications. Therefore some kind of dynamic LCA is needed. These LCA issues are reflected in the calculation of external costs. First, the paper discusses these issues on the examples of two main technologies, namely photovoltaic (PV) and wind. Second, it discusses the results of ExternE for these two specific technologies and gives an outlook for the future. Future needs for a better use of LCA as a support tool for the calcination of external costs are identified. Finally, a new research project funded by the European Commission focused on LCI of renewables is briefly introduced and presented. (author)

  6. Development of computer program for estimating decommissioning cost - 59037

    International Nuclear Information System (INIS)

    Kim, Hak-Soo; Park, Jong-Kil

    2012-01-01

    The programs for estimating the decommissioning cost have been developed for many different purposes and applications. The estimation of decommissioning cost is required a large amount of data such as unit cost factors, plant area and its inventory, waste treatment, etc. These make it difficult to use manual calculation or typical spreadsheet software such as Microsoft Excel. The cost estimation for eventual decommissioning of nuclear power plants is a prerequisite for safe, timely and cost-effective decommissioning. To estimate the decommissioning cost more accurately and systematically, KHNP, Korea Hydro and Nuclear Power Co. Ltd, developed a decommissioning cost estimating computer program called 'DeCAT-Pro', which is Decommission-ing Cost Assessment Tool - Professional. (Hereinafter called 'DeCAT') This program allows users to easily assess the decommissioning cost with various decommissioning options. Also, this program provides detailed reporting for decommissioning funding requirements as well as providing detail project schedules, cash-flow, staffing plan and levels, and waste volumes by waste classifications and types. KHNP is planning to implement functions for estimating the plant inventory using 3-D technology and for classifying the conditions of radwaste disposal and transportation automatically. (authors)

  7. Post operation: The changing characteristics of nuclear fuel cycle costs

    International Nuclear Information System (INIS)

    Frank, F.J.

    1986-01-01

    Fundamental changes have occurred in the nuclear fuel cycle. These changes forged by market forces, legislative action, and regulatory climate appear to be a long term characteristic of the nuclear fuel cycle. The nature of these changes and the resulting emerging importance of post-operation and its impact on fuel cycle costs are examined

  8. AX Tank Farm waste retrieval alternatives cost estimates

    International Nuclear Information System (INIS)

    Krieg, S.A.

    1998-01-01

    This report presents the estimated costs associated with retrieval of the wastes from the four tanks in AX Tank Farm. The engineering cost estimates developed for this report are based on previous cost data prepared for Project W-320 and the HTI 241-C-106 Heel Retrieval System. The costs presented in this report address only the retrieval of the wastes from the four AX Farm tanks. This includes costs for equipment procurement, fabrication, installation, and operation to retrieve the wastes. The costs to modify the existing plant equipment and systems to support the retrieval equipment are also included. The estimates do not include operational costs associated with pumping the waste out of the waste receiver tank (241-AY-102) between AX Farm retrieval campaigns or transportation, processing, and disposal of the retrieved waste

  9. Reducing Design Cycle Time and Cost Through Process Resequencing

    Science.gov (United States)

    Rogers, James L.

    2004-01-01

    In today's competitive environment, companies are under enormous pressure to reduce the time and cost of their design cycle. One method for reducing both time and cost is to develop an understanding of the flow of the design processes and the effects of the iterative subcycles that are found in complex design projects. Once these aspects are understood, the design manager can make decisions that take advantage of decomposition, concurrent engineering, and parallel processing techniques to reduce the total time and the total cost of the design cycle. One software tool that can aid in this decision-making process is the Design Manager's Aid for Intelligent Decomposition (DeMAID). The DeMAID software minimizes the feedback couplings that create iterative subcycles, groups processes into iterative subcycles, and decomposes the subcycles into a hierarchical structure. The real benefits of producing the best design in the least time and at a minimum cost are obtained from sequencing the processes in the subcycles.

  10. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  11. Life-Cycle Costing of Food Waste Management in Denmark: Importance of Indirect Effects

    DEFF Research Database (Denmark)

    Martinez Sanchez, Veronica; Tonini, Davide; Møller, Flemming

    2016-01-01

    assessment combined with life-cycle assessment, to evaluate food waste management. Both life-cycle costing assessments included direct and indirect effects. The latter are related to income effects, accounting for the marginal consumption induced when alternative scenarios lead to different household......Prevention has been suggested as the preferred food waste management solution compared to alternatives such as conversion to animal fodder or to energy. In this study we used societal life-cycle costing, as a welfare economic assessment, and environmental life-cycle costing, as a financial...... be included whenever alternative scenarios incur different financial costs. Furthermore, it highlights that food prevention measures should not only demote the purchase of unconsumed food but also promote a low-impact use of the savings generated....

  12. Life-cycle cost analysis for Foreign Research Reactor, Spent Nuclear Fuel disposal

    International Nuclear Information System (INIS)

    Parks, P.B.; Geddes, R.L.; Jackson, W.N.; McDonell, W.R.; Dupont, M.E.; McWhorter, D.L.; Liutkus, A.S.

    1994-01-01

    DOE-EM-37 requested a life-cycle cost analysis for disposal of the Foreign Research Reactor-Spent Nuclear Fuel (FRR-SNF). The analysis was to address life-cycle and unit costs for a range of FRR-SNF elements from those currently available (6,000 elements) to the (then) bounding case (15,000 elements). Five alternative disposition strategies were devised for the FRR-SNF elements. Life-cycle costs were computed for each strategy. In addition, the five strategies were evaluated in terms of six societal and technical goals. This report summarizes the study that was originally documented to DOE-EM

  13. Supply and demand estimates for the nuclear fuel cycle

    International Nuclear Information System (INIS)

    Haussermann, W.; Hogroian, P.; Krymm, R.; Cameron, J.

    1977-01-01

    Based on the nuclear power growth forecasts described in the papers for Session I.B., estimates of requirements in the nuclear fuel cycle are given, notably concerning: - natural uranium, - enriched uranium, - fuel fabrication services, and - reprocessing services. The influence of realistic scenarios of uranium and plutonium recycling on fuel cycle requirements is discussed. Furthermore, the known plans for uranium and related fuel cycle production capacities are compared with the foreseeable demand. These estimates cover the period between now and the year 2000. However, in order to determine the influence of possible variations in reactor strategies on uranium demand, notably the introduction of breeder reactors, power growth projections and resulting fuel cycle requirements beyond the year 2000 are also briefly considered [fr

  14. Cost Estimating Cases: Educational Tools for Cost Analysts

    Science.gov (United States)

    1993-09-01

    only appropriate documentation should be provided. In other words, students should not submit all of the documentation possible using ACEIT , only that...case was their lack of understanding of the ACEIT software used to conduct the estimate. Specifically, many students misinterpreted the cost...estimating relationships (CERs) embedded in the 49 software. Additionally, few of the students were able to properly organize the ACEIT documentation output

  15. Development of the fuel-cycle costs in nuclear power stations with light-water reactors

    International Nuclear Information System (INIS)

    Brosch, R.; Moraw, G.; Musil, G.; Schneeberger, M.

    1976-01-01

    The authors investigate the fuel-cycle costs in nuclear power stations with light-water reactors in the Federal Republic of Germany in the years 1966 to 1976. They determine the effect of the price development for the individual components of the nuclear fuel cycle on the fuel-cycle costs averaged over the whole power station life. Here account is taken also of inflation rates and the change in the DM/US $ parity. In addition they give the percentage apportionment of the fuel-cycle costs. The authors show that real fuel-cycle costs for nuclear power stations with light-water reactors in the Federal Republic of Germany have risen by 11% between 1966 and 1976. This contradicts the often repeated reproach that fuel costs in nuclear power stations are rising very steeply and are no longer competitive. (orig.) [de

  16. State-Level Estimates of Cancer-Related Absenteeism Costs

    Science.gov (United States)

    Tangka, Florence K.; Trogdon, Justin G.; Nwaise, Isaac; Ekwueme, Donatus U.; Guy, Gery P.; Orenstein, Diane

    2016-01-01

    Background Cancer is one of the top five most costly diseases in the United States and leads to substantial work loss. Nevertheless, limited state-level estimates of cancer absenteeism costs have been published. Methods In analyses of data from the 2004–2008 Medical Expenditure Panel Survey, the 2004 National Nursing Home Survey, the U.S. Census Bureau for 2008, and the 2009 Current Population Survey, we used regression modeling to estimate annual state-level absenteeism costs attributable to cancer from 2004 to 2008. Results We estimated that the state-level median number of days of absenteeism per year among employed cancer patients was 6.1 days and that annual state-level cancer absenteeism costs ranged from $14.9 million to $915.9 million (median = $115.9 million) across states in 2010 dollars. Absenteeism costs are approximately 6.5% of the costs of premature cancer mortality. Conclusions The results from this study suggest that lost productivity attributable to cancer is a substantial cost to employees and employers and contributes to estimates of the overall impact of cancer in a state population. PMID:23969498

  17. Nature of macroeconomic equilibrium and driving force of economic cycles in the light of difference between money and exergy forms in cost estimations

    Energy Technology Data Exchange (ETDEWEB)

    Bandura, A.V. [National Politechnical Univ., Kiev (Ukraine); Brodianskii, V.M. [Moscow Power Engineering Inst. Technical Univ. (Russian Federation)

    1996-11-01

    The main problem of exergy application directly in economic analysis is to find valid correlation between money-based cost and exergy based one (including exergy expenses of labour) and to define exergy cost as an economic category among the existing traditional economic ones. The present report is aimed to search the way for this macroeconomic problems` solution. It is demonstrated that exergy-based cost can be recalculated in a monetary form using a coefficient, defined as a ratio between money supply and the total exergy of all natural resources involved in production process, i.e. as a ratio between monetary and exergy bases. The difference between `natural` and current prices (P) can be used directly both for general quantitative characteristics of an economic cycles driving force and for control of market relationship imperfection. It is shown that for the period of time with the positive P, that is, current price is lower than a `natural` one, the recoveries in business cycles are observed. For the period of time with the negative P, that is, current price is higher than a natural one, economic recessions are observed. The moment of time when P = 0 corresponds to the turning point of a business cycle. In such a way the possibility to predict the turning points of business cycles is demonstrated. 14 refs, 2 figs, 2 tabs

  18. Analysis of the total system life cycle cost for the Civilian Radioactive Waste Management Program: Volume 2, Supporting information

    International Nuclear Information System (INIS)

    1987-06-01

    This report provides cost estimates for the fifth evaluation of the adequacy of the fee and is consistent with the program strategy and plans. The total-system cost for the reference cases in the improved-performance system is estimated at $32.1 to $38.2 billion (expressed in constant 1986 collars) over the entire life of the system, or $1.5 to $1.6 billion more than that of the authorized system (i.e., the system without an MRS facility). The current estimate of the total-system cost for the reference cases in the improved-performance system is $3.8 to $5.4 billion higher than the estimate for the same system in the 1986 TSLCC analysis. In the case with the maximum increase, nearly all of the higher cost is due to a $5.2-billion increase in the costs of development and evaluation (D and E); all other system costs are essentially unchanged. The cost difference between the improved-performance system and the authorized system is smaller than the difference estimated in last year's TSLCC analysis. Volume 2 presents the detailed results for the 1987 analysis of the total-system life cycle cost (TSLCC). It consists of four sections: Section A presents the yearly flows of waste between waste-management facilities for the 12 aggregate logistics cases that were studied; Section B presents the annual total-system costs for each of the 30 TSLCC cases by major cost category; Section C presents the annual costs for the disposal of 16,000 canisters of defense high-level waste (DHLW) by major cost category for each of the 30 TSLCC cases; and Section D presents a summary of the cost-allocation factors that were calculated to determine the defense waste share of the total-system costs

  19. 48 CFR 1852.216-74 - Estimated cost and fixed fee.

    Science.gov (United States)

    2010-10-01

    ... and Clauses 1852.216-74 Estimated cost and fixed fee. As prescribed in 1816.307-70(b), insert the following clause: Estimated Cost and Fixed Fee (DEC 1991) The estimated cost of this contract is ______ exclusive of the fixed fee of ______. The total estimated cost and fixed fee is ______. (End of clause) [62...

  20. Cost of Capital Estimation for Highway Concessionaires in Chile

    Directory of Open Access Journals (Sweden)

    Cristian Vergara-Novoa

    2018-01-01

    Full Text Available In this paper, we present the cost of capital estimation for highway concessionaires in Chile. We estimated the cost of equity and the cost of debt and determined the capital structure for each one of twenty-four concessionaires that operate highways. We based our estimations on the developments of Sharpe (1964, Modigliani and Miller (1958, and Maquieira (2009, which were also compared with the Brusov et al. (2015 developments. We collected stock prices for different highway concessionaires around the world from Google Finance and Reuters’ websites in order to determine the Beta of equity using a representative company. After that, we estimated the cost of equity considering Hamada (1969 and a Capital Asset Pricing Model. Then, we estimated the cost of capital using the cost of debt and the capital structure of Chile’s highway concessionaires. With all above, we were able to determine the Weighted Average Cost of Capital (WACC for highway concessions which ranges from 5.49 to 6.62%.

  1. Cost-estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Delene, J.G.; Hudson, C.R.

    1993-01-01

    Various advanced power plant concepts are currently under development. These include several advanced light water reactors as well as the modular high-temperature gas-cooled reactor and the advanced liquid-metal reactor. One measure-of the attractiveness of a new concept is cost. Invariably, the cost of a new type of power plant will be compared with other alternative forms of electric generation. In order to make reasonable comparative assessments of competing technologies, consistent ground rules and assumptions must be applied when developing cost estimates. This paper describes the cost-estimate guidelines developed by Oak Ridge National Laboratory for the U.S. Department of Energy (DOE) to be used in developing cost estimates for the advanced nuclear reactors and how these guidelines relate to the DOE cost verification process

  2. Review of hardware cost estimation methods, models and tools applied to early phases of space mission planning

    Science.gov (United States)

    Trivailo, O.; Sippel, M.; Şekercioğlu, Y. A.

    2012-08-01

    The primary purpose of this paper is to review currently existing cost estimation methods, models, tools and resources applicable to the space sector. While key space sector methods are outlined, a specific focus is placed on hardware cost estimation on a system level, particularly for early mission phases during which specifications and requirements are not yet crystallised, and information is limited. For the space industry, cost engineering within the systems engineering framework is an integral discipline. The cost of any space program now constitutes a stringent design criterion, which must be considered and carefully controlled during the entire program life cycle. A first step to any program budget is a representative cost estimate which usually hinges on a particular estimation approach, or methodology. Therefore appropriate selection of specific cost models, methods and tools is paramount, a difficult task given the highly variable nature, scope as well as scientific and technical requirements applicable to each program. Numerous methods, models and tools exist. However new ways are needed to address very early, pre-Phase 0 cost estimation during the initial program research and establishment phase when system specifications are limited, but the available research budget needs to be established and defined. Due to their specificity, for vehicles such as reusable launchers with a manned capability, a lack of historical data implies that using either the classic heuristic approach such as parametric cost estimation based on underlying CERs, or the analogy approach, is therefore, by definition, limited. This review identifies prominent cost estimation models applied to the space sector, and their underlying cost driving parameters and factors. Strengths, weaknesses, and suitability to specific mission types and classes are also highlighted. Current approaches which strategically amalgamate various cost estimation strategies both for formulation and validation

  3. Power plant cost estimates put to the test

    International Nuclear Information System (INIS)

    Crowley, J.H.

    1978-01-01

    The growth in standards for nuclear applications and the impact of these codes and standards on the cost of nuclear power plants is described. The preparation of cost estimates and reasons for apparent discrepancies are discussed. Consistent estimates of nuclear power plant costs have been prepared in the USA for over a decade. They show that the difference in capital costs between nuclear and coal fired plants is narrowing and that when total generating costs are calculated nuclear power is substantially cheaper. (UK)

  4. Estimating costs in the economic evaluation of medical technologies.

    Science.gov (United States)

    Luce, B R; Elixhauser, A

    1990-01-01

    The complexities and nuances of evaluating the costs associated with providing medical technologies are often underestimated by analysts engaged in economic evaluations. This article describes the theoretical underpinnings of cost estimation, emphasizing the importance of accounting for opportunity costs and marginal costs. The various types of costs that should be considered in an analysis are described; a listing of specific cost elements may provide a helpful guide to analysis. The process of identifying and estimating costs is detailed, and practical recommendations for handling the challenges of cost estimation are provided. The roles of sensitivity analysis and discounting are characterized, as are determinants of the types of costs to include in an analysis. Finally, common problems facing the analyst are enumerated with suggestions for managing these problems.

  5. Cost estimates for nuclear power in the UK

    International Nuclear Information System (INIS)

    Harris, Grant; Heptonstall, Phil; Gross, Robert; Handley, David

    2013-01-01

    Current UK Government support for nuclear power has in part been informed by cost estimates that suggest that electricity from new nuclear power stations will be competitive with alternative low carbon generation options. The evidence and analysis presented in this paper suggests that the capital cost estimates for nuclear power that are being used to inform these projections rely on costs escalating over the pre-construction and construction phase of the new build programme at a level significantly below those that have been experienced by past US and European programmes. This paper applies observed construction time and cost escalation rates to the published estimates of capital costs for new nuclear plant in the UK and calculates the potential impact on levelised cost per unit of electricity produced. The results suggest that levelised cost may turn out to be significantly higher than expected which in turn has important implications for policy, both in general terms of the potential costs to consumers and more specifically for negotiations around the level of policy support and contractual arrangements offered to individual projects through the proposed contract for difference strike price. -- Highlights: •Nuclear power projects costs can rise substantially during the construction period. •Pre-construction and construction time can be much longer than anticipated. •Adjusting estimates for observed experience increases levelised costs significantly. •Higher costs suggest that more policy support than envisaged may be required

  6. Fuel Cell System for Transportation -- 2005 Cost Estimate

    Energy Technology Data Exchange (ETDEWEB)

    Wheeler, D.

    2006-10-01

    Independent review report of the methodology used by TIAX to estimate the cost of producing PEM fuel cells using 2005 cell stack technology. The U.S. Department of Energy (DOE) Hydrogen, Fuel Cells and Infrastructure Technologies Program Manager asked the National Renewable Energy Laboratory (NREL) to commission an independent review of the 2005 TIAX cost analysis for fuel cell production. The NREL Systems Integrator is responsible for conducting independent reviews of progress toward meeting the DOE Hydrogen Program (the Program) technical targets. An important technical target of the Program is the proton exchange membrane (PEM) fuel cell cost in terms of dollars per kilowatt ($/kW). The Program's Multi-Year Program Research, Development, and Demonstration Plan established $125/kW as the 2005 technical target. Over the last several years, the Program has contracted with TIAX, LLC (TIAX) to produce estimates of the high volume cost of PEM fuel cell production for transportation use. Since no manufacturer is yet producing PEM fuel cells in the quantities needed for an initial hydrogen-based transportation economy, these estimates are necessary for DOE to gauge progress toward meeting its targets. For a PEM fuel cell system configuration developed by Argonne National Laboratory, TIAX estimated the total cost to be $108/kW, based on assumptions of 500,000 units per year produced with 2005 cell stack technology, vertical integration of cell stack manufacturing, and balance-of-plant (BOP) components purchased from a supplier network. Furthermore, TIAX conducted a Monte Carlo analysis by varying ten key parameters over a wide range of values and estimated with 98% certainty that the mean PEM fuel cell system cost would be below DOE's 2005 target of $125/kW. NREL commissioned DJW TECHNOLOGY, LLC to form an Independent Review Team (the Team) of industry fuel cell experts and to evaluate the cost estimation process and the results reported by TIAX. The results of

  7. Cost benefit analysis of recycling nuclear fuel cycle in Korea

    International Nuclear Information System (INIS)

    Lee, Jewhan; Chang, Soonheung

    2012-01-01

    Nuclear power has become an essential part of electricity generation to meet the continuous growth of electricity demand. The importance if nuclear waste management has been the main issue since the beginning of nuclear history. The recycling nuclear fuel cycle includes the fast reactor, which can burn the nuclear wastes, and the pyro-processing technology, which can reprocess the spent nuclear fuel. In this study, a methodology using Linear Programming (LP) is employed to evaluate the cost and benefits of introducing the recycling strategy and thus, to see the competitiveness of recycling fuel cycle. The LP optimization involves tradeoffs between the fast reactor capital cost with pyro-processing cost premiums and the total system uranium price with spent nuclear fuel management cost premiums. With the help of LP and sensitivity analysis, the effect of important parameters is presented as well as the target values for each cost and price of key factors

  8. Development of a simple estimation tool for LMFBR construction cost

    International Nuclear Information System (INIS)

    Yoshida, Kazuo; Kinoshita, Izumi

    1999-01-01

    A simple tool for estimating the construction costs of liquid-metal-cooled fast breeder reactors (LMFBRs), 'Simple Cost' was developed in this study. Simple Cost is based on a new estimation formula that can reduce the amount of design data required to estimate construction costs. Consequently, Simple cost can be used to estimate the construction costs of innovative LMFBR concepts for which detailed design has not been carried out. The results of test calculation show that Simple Cost provides cost estimations equivalent to those obtained with conventional methods within the range of plant power from 325 to 1500 MWe. Sensitivity analyses for typical design parameters were conducted using Simple Cost. The effects of four major parameters - reactor vessel diameter, core outlet temperature, sodium handling area and number of secondary loops - on the construction costs of LMFBRs were evaluated quantitatively. The results show that the reduction of sodium handling area is particularly effective in reducing construction costs. (author)

  9. Cost Estimating for Decommissioning of a Plutonium Facility--Lessons Learned From The Rocky Flats Building 771 Project

    International Nuclear Information System (INIS)

    Stevens, J. L.; Titus, R.; Sanford, P. C.

    2002-01-01

    The Rocky Flats Closure Site is implementing an aggressive approach in an attempt to complete Site closure by 2006. The replanning effort to meet this goal required that the life-cycle decommissioning effort for the Site and for the major individual facilities be reexamined in detail. As part of the overall effort, the cost estimate for the Building 771 decommissioning project was revised to incorporate both actual cost data from a recently-completed similar project and detailed planning for all activities. This paper provides a brief overview of the replanning process and the original estimate, and then discusses the modifications to that estimate to reflect new data, methods, and planning rigor. It provides the new work breakdown structure and discusses the reasons for the final arrangement chosen. It follows with the process used to assign scope, cost, and schedule elements within the new structure, and development of the new code of accounts. Finally, it describes the project control methodology used to track the project, and provides lessons learned on cost tracking in the decommissioning environment

  10. Calculating the Unit Cost Factors for Decommissioning Cost Estimation of the Nuclear Research Reactor

    International Nuclear Information System (INIS)

    Jeong, Kwan Seong; Lee, Dong Gyu; Jung, Chong Hun; Lee, Kune Woo

    2006-01-01

    The estimated decommissioning cost of nuclear research reactor is calculated by applying a unit cost factor-based engineering cost calculation method on which classification of decommissioning works fitted with the features and specifications of decommissioning objects and establishment of composition factors are based. Decommissioning cost of nuclear research reactor is composed of labor cost, equipment and materials cost. Labor cost of decommissioning costs in decommissioning works are calculated on the basis of working time consumed in decommissioning objects. In this paper, the unit cost factors and work difficulty factors which are needed to calculate the labor cost in estimating decommissioning cost of nuclear research reactor are derived and figured out.

  11. Life Cycle Costing in Sustainability Assessment—A Case Study of Remanufactured Alternators

    Directory of Open Access Journals (Sweden)

    Annekatrin Lehmann

    2011-11-01

    Full Text Available Sustainability is on the international agenda, and is a driver for industry in international competition. Sustainability encompasses the three pillars: environment, society and economy. To prevent shifting of burden, the whole life cycle needs to be taken into account. For the environmental dimension of sustainability, life cycle assessment (LCA has been practiced for a while and is a standardized method. A life cycle approach for the social and economic pillars of sustainability needs to be further developed. This paper investigates the application of life cycle costing (LCC as part of a wider sustainability assessment where also social life cycle assessment (SLCA and LCA are combined. LCA-type LCC is applied on a case study of remanufactured alternators. Remanufacturing of automobile parts is a fast growing important business with large potential for cost and resource savings. Three design alternatives for the alternator and three locations for the remanufacturing plant are evaluated. The remanufacturer perspective and the user perspective are investigated. The results for the LCA-type LCC show that the largest cost for the remanufacturer is the new parts replacing old warn parts. However, the user cost, and therein especially, cost for fuel used for the alternator’s power production dominates and should be the focus for further improvement. In conducting the case study, it was revealed that the connection between the LCA-type LCC results and the economic dimension of sustainability needs to be further investigated and defined. For this purpose, areas of protection for life cycle sustainability assessment and LCA-type LCC in particular need further development.

  12. An Overview Of Tool For Response Action Cost Estimating (TRACE)

    International Nuclear Information System (INIS)

    Ferries, S.R.; Klink, K.L.; Ostapkowicz, B.

    2012-01-01

    Tools and techniques that provide improved performance and reduced costs are important to government programs, particularly in current times. An opportunity for improvement was identified for preparation of cost estimates used to support the evaluation of response action alternatives. As a result, CH2M HILL Plateau Remediation Company has developed Tool for Response Action Cost Estimating (TRACE). TRACE is a multi-page Microsoft Excel(reg s ign) workbook developed to introduce efficiencies into the timely and consistent production of cost estimates for response action alternatives. This tool combines costs derived from extensive site-specific runs of commercially available remediation cost models with site-specific and estimator-researched and derived costs, providing the best estimating sources available. TRACE also provides for common quantity and key parameter links across multiple alternatives, maximizing ease of updating estimates and performing sensitivity analyses, and ensuring consistency.

  13. 78 FR 61227 - Public Assistance Cost Estimating Format for Large Projects

    Science.gov (United States)

    2013-10-03

    ... equipment. The base cost (construction costs) plus nonconstruction costs equal the total eligible cost... included the estimated base cost plus the estimated nonconstruction costs. Under the traditional method... total cost of completing the project. This ``forward- pricing'' methodology provides an estimate of the...

  14. Life Cycle Cost Analysis of Ready Mix Concrete Plant

    Science.gov (United States)

    Topkar, V. M.; Duggar, A. R.; Kumar, A.; Bonde, P. P.; Girwalkar, R. S.; Gade, S. B.

    2013-11-01

    India, being a developing nation is experiencing major growth in its infrastructural sector. Concrete is the major component in construction. The requirement of good quality of concrete in large quantities can be fulfilled by ready mix concrete batching and mixing plants. The paper presents a technique of applying the value engineering tool life cycle cost analysis to a ready mix concrete plant. This will help an investor or an organization to take investment decisions regarding a ready mix concrete facility. No economic alternatives are compared in this study. A cost breakdown structure is prepared for the ready mix concrete plant. A market survey has been conducted to collect realistic costs for the ready mix concrete facility. The study establishes the cash flow for the ready mix concrete facility helpful in investment and capital generation related decisions. Transit mixers form an important component of the facility and are included in the calculations. A fleet size for transit mixers has been assumed for this purpose. The life cycle cost has been calculated for the system of the ready mix concrete plant and transit mixers.

  15. Support to LANL: Cost estimation. Final report

    International Nuclear Information System (INIS)

    1993-01-01

    This report summarizes the activities and progress by ICF Kaiser Engineers conducted on behalf of Los Alamos National Laboratories (LANL) for the US Department of Energy, Office of Waste Management (EM-33) in the area of improving methods for Cost Estimation. This work was conducted between October 1, 1992 and September 30, 1993. ICF Kaiser Engineers supported LANL in providing the Office of Waste Management with planning and document preparation services for a Cost and Schedule Estimating Guide (Guide). The intent of the Guide was to use Activity-Based Cost (ABC) estimation as a basic method in preparing cost estimates for DOE planning and budgeting documents, including Activity Data Sheets (ADSs), which form the basis for the Five Year Plan document. Prior to the initiation of the present contract with LANL, ICF Kaiser Engineers was tasked to initiate planning efforts directed toward a Guide. This work, accomplished from June to September, 1992, included visits to eight DOE field offices and consultation with DOE Headquarters staff to determine the need for a Guide, the desired contents of a Guide, and the types of ABC estimation methods and documentation requirements that would be compatible with current or potential practices and expertise in existence at DOE field offices and their contractors

  16. Cost estimate and economic issues associated with the MOX option (prior to DOE's record of decision)

    International Nuclear Information System (INIS)

    Reid, R.L.; Miller, J.W.

    1997-04-01

    Before the January 1997 Record of Decision (ROD), the U.S. Department of Energy Office of Fissile Materials Disposition (DOE-MD) evaluated three technologies for the disposition of ∼50 MT of surplus plutonium from defense-related programs-reactors, immobilization, and deep boreholes. As part of the process supporting the ROD, and comprehensive assessment of technical viability, cost, and schedule was conducted by DOE-MD and its national laboratory contractors. Oak Ridge National Laboratory managed and coordinated the life-cycle cost (LCC) assessment effort for this program. This report discusses the economic analysis methodology and the results for the reactor options considered prior to ROD. A secondary intent of the report is to discuss major technical and economic issues that impact cost and schedule. To evaluate the economics of the reactor option and other technologies on an equitable basis, a set of cost-estimating guidelines and a common cost-estimating format were utilized by all three technology teams. This report includes the major economic analysis assumptions and the comparative constant-dollar and discounted-dollar LCCs for all nine reactor scenarios

  17. Embedding Life Cycle Costing in 5D BIM

    OpenAIRE

    Kehily, Dermot; Underwood,, Jason

    2017-01-01

    Life Cycle Costing (LCC) is the consideration of all ‘relevant’ costs and revenues associated with the acquisition and ownership of an asset. LCC has a number of relevant applications, these include project appraisal; facilities management; procurement and tendering and as a means to evaluate sustainable construction. Although these advantages are well recognised, the process is underutilised due to a number of documented barriers to adoption. Notably these include lack of accurate historical...

  18. The Practice of Cost Estimation for Decommissioning of Nuclear Facilities

    International Nuclear Information System (INIS)

    Davidova, Ivana; Desecures, Sylvain; Lexow, Thomas; Buonarroti, Stefano; Marini, Giuseppe; Pescatore, Claudio; Rehak, Ivan; Weber, Inge; ); Daniska, Vladimir; Linan, Jorge Borque; Caroll, Simon; Hedberg, Bjoern; De La Gardie, Fredrik; Haenggi, Hannes; Laguardia, Thomas S.; Ridpath, Andy

    2015-01-01

    Decommissioning of both commercial and R and D nuclear facilities is expected to increase significantly in the coming years, and the largest of such industrial decommissioning projects could command considerable budgets. Several approaches are currently being used for decommissioning cost estimations, with an international culture developing in the field. The present cost estimation practice guide was prepared in order to offer international actors specific guidance in preparing quality cost and schedule estimates to support detailed budgeting for the preparation of decommissioning plans, for the securing of funds and for decommissioning implementation. This guide is based on current practices and standards in a number of NEA member countries and aims to help consolidate the practice and process of decommissioning cost estimation so as to make it more widely understood. It offers a useful reference for the practitioner and for training programmes. The remainder of report is divided into the following chapters: - Chapter 2 covers the purpose and nature of decommissioning cost estimates, approaches to cost estimation and the major elements of a cost estimate. - Chapter 3 examines the development of the integrated schedule of the activity-dependent work scope and the determination of the project critical path. - Chapter 4 describes the attributes of a quality assurance programme applicable to cost estimation and the use and cautions of benchmarking the estimate from other estimates or actual costs. - Chapter 5 describes the pyramidal structure of the report, and the scope and content that should be included in the cost study report to ensure consistency and transparency in the estimate underpinnings. - Chapter 6 provides some observations, conclusions and recommendations on the use of this guide

  19. IDC reengineering Phase 2 & 3 US industry standard cost estimate summary

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Huelskamp, Robert M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-01-01

    Sandia National Laboratories has prepared a ROM cost estimate for budgetary planning for the IDC Reengineering Phase 2 & 3 effort, using a commercial software cost estimation tool calibrated to US industry performance parameters. This is not a cost estimate for Sandia to perform the project. This report provides the ROM cost estimate and describes the methodology, assumptions, and cost model details used to create the ROM cost estimate. ROM Cost Estimate Disclaimer Contained herein is a Rough Order of Magnitude (ROM) cost estimate that has been provided to enable initial planning for this proposed project. This ROM cost estimate is submitted to facilitate informal discussions in relation to this project and is NOT intended to commit Sandia National Laboratories (Sandia) or its resources. Furthermore, as a Federally Funded Research and Development Center (FFRDC), Sandia must be compliant with the Anti-Deficiency Act and operate on a full-cost recovery basis. Therefore, while Sandia, in conjunction with the Sponsor, will use best judgment to execute work and to address the highest risks and most important issues in order to effectively manage within cost constraints, this ROM estimate and any subsequent approved cost estimates are on a 'full-cost recovery' basis. Thus, work can neither commence nor continue unless adequate funding has been accepted and certified by DOE.

  20. Strategy on energy saving reconstruction of distribution networks based on life cycle cost

    Science.gov (United States)

    Chen, Xiaofei; Qiu, Zejing; Xu, Zhaoyang; Xiao, Chupeng

    2017-08-01

    Because the actual distribution network reconstruction project funds are often limited, the cost-benefit model and the decision-making method are crucial for distribution network energy saving reconstruction project. From the perspective of life cycle cost (LCC), firstly the research life cycle is determined for the energy saving reconstruction of distribution networks with multi-devices. Then, a new life cycle cost-benefit model for energy-saving reconstruction of distribution network is developed, in which the modification schemes include distribution transformers replacement, lines replacement and reactive power compensation. In the operation loss cost and maintenance cost area, the operation cost model considering the influence of load season characteristics and the maintenance cost segmental model of transformers are proposed. Finally, aiming at the highest energy saving profit per LCC, a decision-making method is developed while considering financial and technical constraints as well. The model and method are applied to a real distribution network reconstruction, and the results prove that the model and method are effective.

  1. A Survey of Cost Estimating Methodologies for Distributed Spacecraft Missions

    Science.gov (United States)

    Foreman, Veronica L.; Le Moigne, Jacqueline; de Weck, Oliver

    2016-01-01

    Satellite constellations present unique capabilities and opportunities to Earth orbiting and near-Earth scientific and communications missions, but also present new challenges to cost estimators. An effective and adaptive cost model is essential to successful mission design and implementation, and as Distributed Spacecraft Missions (DSM) become more common, cost estimating tools must become more representative of these types of designs. Existing cost models often focus on a single spacecraft and require extensive design knowledge to produce high fidelity estimates. Previous research has examined the limitations of existing cost practices as they pertain to the early stages of mission formulation, for both individual satellites and small satellite constellations. Recommendations have been made for how to improve the cost models for individual satellites one-at-a-time, but much of the complexity in constellation and DSM cost modeling arises from constellation systems level considerations that have not yet been examined. This paper constitutes a survey of the current state-of-theart in cost estimating techniques with recommendations for improvements to increase the fidelity of future constellation cost estimates. To enable our investigation, we have developed a cost estimating tool for constellation missions. The development of this tool has revealed three high-priority shortcomings within existing parametric cost estimating capabilities as they pertain to DSM architectures: design iteration, integration and test, and mission operations. Within this paper we offer illustrative examples of these discrepancies and make preliminary recommendations for addressing them. DSM and satellite constellation missions are shifting the paradigm of space-based remote sensing, showing promise in the realms of Earth science, planetary observation, and various heliophysical applications. To fully reap the benefits of DSM technology, accurate and relevant cost estimating capabilities

  2. Implementation of life cycle costing for a commercial building: case of a residential apartment at Yogyakarta

    Directory of Open Access Journals (Sweden)

    Kaming Peter F

    2017-01-01

    Full Text Available Analysis of a design process is very important in controlling the initial costs and future costs in possession of an investment project such as commercial building. Therefore, it should be wise to perform a life cycle cost analysis to determine the cost of any category contained in future cost of the building. The analysis also provide information to see how much the total cost incurred by a development project from initial to the future cost by implementing BS ISO 15686 part 5: 2008, regarding life cycle costing. The purpose of this study is to identify the cost proportion and make long-term plans of a commercial building in term of its life cycle costing from a case of a residential apartment in Yogyakarta, Indonesia. Results of the study show that there are three groups that make up the life cycle cost: the cost of development of the building, the operating costs, and the cost of maintenance and replacement. For a long-term plan the life cycle cost for 25 years the percentage obtained as follows, initial development cost of 42%, operational costs 39%, maintenance and replacement costs 19%. The results would also make comparison with other existing commercial buildings.

  3. Project cost estimation techniques used by most emerging building ...

    African Journals Online (AJOL)

    Keywords: Cost estimation, estimation methods, emerging contractors, tender. Dr Solly Matshonisa .... historical cost data (data from cost accounting records and/ ..... emerging contractors in tendering. Table 13: Use of project risk management versus responsibility: expected. Internal document analysis. Checklist analysis.

  4. 48 CFR 1852.216-85 - Estimated cost and award fee.

    Science.gov (United States)

    2010-10-01

    ... and Clauses 1852.216-85 Estimated cost and award fee. As prescribed in 1816.406-70(e), insert the following clause: Estimated Cost and Award Fee (SEP 1993) The estimated cost of this contract is $___. The... cost, base fee, and maximum award fee are $___. (End of clause) Alternate I (SEP 1993). As prescribed...

  5. Cost estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Hudson, C.R. II.

    1986-07-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies

  6. Cost estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Hudson, C.R. II.

    1987-07-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies

  7. Radium removal processes capital and operating cost estimates

    International Nuclear Information System (INIS)

    Kelly, F.J.

    1979-09-01

    An estimate of the fixed capital and operating costs for two alternative processes for the removal of dissolved Ra-226 from uranium mill effluent in Elliot Lake, Ontario is presented. Process 1 consists of barium-radium coprecipitation followed by coagulation, flocculation and sedimentation. Process 2 consists of barium-radium coprecipitation followed by gravity media filtration, sand filter backwashing and sedimentation. Cost estimates were prepared for 18 different plant configurations designed to treat 1000 and 4000 imperial gallons per minute (ig/m) of effluent, 24 hrs per day, 7 days per week and 365 days per year with several equipment options. The estimated fixed capital costs for plants equipped with gravity filters were less than those equipped with circular clarifiers. The capital costs ranged from $552,000 with a flow rate of 1000 ig/m to $2,578,000 with a flow rate of 4000 ig/m. Estimated annual operating costs, based on a plant life of 10 years, ranged from $298,000 with a flow rate of 1000 ig/m to $1,061,000 with a flow rate of 4000 ig/m

  8. Cost estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Delene, J.G.; Hudson, C.R. II.

    1993-05-01

    Several advanced power plant concepts are currently under development. These include the Modular High Temperature Gas Cooled Reactors, the Advanced Liquid Metal Reactor and the Advanced Light Water Reactors. One measure of the attractiveness of a new concept is its cost. Invariably, the cost of a new type of power plant will be compared with other alternative forms of electrical generation. This report provides a common starting point, whereby the cost estimates for the various power plants to be considered are developed with common assumptions and ground rules. Comparisons can then be made on a consistent basis. This is the second update of these cost estimate guidelines. Changes have been made to make the guidelines more current (January 1, 1992) and in response to suggestions made as a result of the use of the previous report. The principal changes are that the reference site has been changed from a generic Northeast (Middletown) site to a more central site (EPRI's East/West Central site) and that reference bulk commodity prices and labor productivity rates have been added. This report is designed to provide a framework for the preparation and reporting of costs. The cost estimates will consist of the overnight construction cost, the total plant capital cost, the operation and maintenance costs, the fuel costs, decommissioning costs and the power production or busbar generation cost

  9. Waste management facilities cost information for transuranic waste

    International Nuclear Information System (INIS)

    Shropshire, D.; Sherick, M.; Biagi, C.

    1995-06-01

    This report contains preconceptual designs and planning level life-cycle cost estimates for managing transuranic waste. The report's information on treatment and storage modules can be integrated to develop total life-cycle costs for various waste management options. A procedure to guide the U.S. Department of Energy and its contractor personnel in the use of cost estimation data is also summarized in this report

  10. Fuel Cycle Cost Calculations for a 120,000 shp PWR for Ship Propulsion. RCN Report

    International Nuclear Information System (INIS)

    Dekker, N.H.; Foggi, C.; Giacomazzi, G.

    1972-02-01

    A parametric study of the fuel cycle costs for a 120,000 SHP PWR for ship propulsion has been carried out. Variable parameters are: fuel pellet diameter, moderating ratio and refuelling scheme. Minimum fuel cycle costs can be obtained at moderating ratios of about 2.2. Both fuel cycle costs and reactor control requirements favour the two batch core. (author)

  11. Implementation of a Cost-Accounting System for Visibility of Weapon Systems Life-Cycle Costs

    National Research Council Canada - National Science Library

    Ugone, Mary

    2001-01-01

    .... The DoD Acquisition Reform Goal 10 required DoD to define requirements and establish an implementation plan for a cost-accounting system that provides routine visibility into weapon system life-cycle...

  12. Remarks on the influence of enrichment reduction on fuel cycle costs

    International Nuclear Information System (INIS)

    Krull, W.

    1985-01-01

    The cost factors influencing the fuel cycle cost analysis for research reactors are discussed in detail with special emphasis on fuel element fabrication costs, burnup and reprocessing costs. Two different aspects for the conversion from HEU to LEU are considered: plus 14% U-235 weight per LEU fuel element and plus ca. 50 % U-235 weight per LEU fuel element. The cost factors and these conversion aspects were taken for calculating the changes in fuel cycle costs for the three different meat materials U 3 O 8 , U 3 Si 2 and U 3 Si. The results of these calculations can be summarized as following: - if in the HEU case the fuel loading and the burnup of a fuel element is low there will be some economic advantages in the LEU case; - if in the HEU case the fuel loading and the burnup of a fuel element is high there will be economic disadvantages in the LEU case. (author)

  13. Sensitivity of nuclear fuel cycle cost to uncertainties in nuclear data

    International Nuclear Information System (INIS)

    Harris, D.R.; Becker, M.; Parvez, A.; Ryskamp, J.M.

    1979-01-01

    A sensitivity analysis system is developed for assessing the economic implications of uncertainties in nuclear data and related computational methods for light water power reactors. Results of the sensitivity analysis indicate directions for worthwhile improvements in data and methods. Benefits from improvements in data and methods are related to reduction of margins provided by designers to ensure meeting reactor and fuel objectives. Sensitivity analyses are carried out using the batch depletion code FASTCELL, the core analysis code FASTCORE, and the reactor cost code COSTR. FASTCELL depletes a cell using methods comparable to industry cell codes except for a few-group treatment of cell flux distribution. FASTCORE is used with the Haling strategy of fixed power sharing among batches in the core. COSTR computes costs using components and techniques as in industry costing codes, except that COSTR uses fixed payment schedules. Sensitivity analyses are carried out for large commercial boiling and pressurized water reactors. Each few-group nuclear parameter is changed, and initial enrichment is also changed so as to keep the end-of-cycle core multiplication factor unchanged, i.e., to preserve cycle time at the demand power. Sensitivities of equilibrium fuel cycle cost are determined with respect to approx. 300 few-group nuclear parameters, both for a normal fuel cycle and for a throwaway fuel cycle. Particularly large dollar implications are found for thermal and resonance range cross sections in fissile and fertile materials. Sensitivities constrained by adjustment of fission neutron yield so as to preserve agreement with zero exposure integral data also are computed

  14. Sensitivity of LWR fuel cycle costs to uncertainties in detailed thermal cross sections

    International Nuclear Information System (INIS)

    Ryskamp, J.M.; Becker, M.; Harris, D.R.

    1979-01-01

    Cross sections averaged over the thermal energy (< 1 or 2 eV) group have been shown to have an important economic role for light-water reactors. Cost implications of thermal cross section uncertainties at the few-group level were reported earlier. When it has been determined that costs are sensitive to a specific thermal-group cross section, it becomes desirable to determine how specific energy-dependent cross sections influence fuel cycle costs. Multigroup cross-section sensitivity coefficients vary with fuel exposure. By changing the shape of a cross section displayed on a view-tube through an interactive graphics system, one can compute the change in few-group cross section using the exposure dependent sensitivity coefficients. With the changed exposure dependent few-group cross section, a new fuel cycle cost is computed by a sequence of batch depletion, core analysis, and fuel batch cost code modules. Fuel cycle costs are generally most sensitive to cross section uncertainties near the peak of the hardened Maxwellian flux

  15. Life-cycle cost trade studies for hardness assurance

    International Nuclear Information System (INIS)

    Millward, D.G.

    1996-01-01

    Based on hardness assurance (HA) cost trade studies conducted on a low-cost/high-volume tactical military system with moderate radiation environments, conventional strategies for design hardening and HA can result in higher life-cycle costs (LCC) than alternate approaches. The trade studies used variables designed to investigate LCC as a function of several critical parameters, including semiconductor procurement option, system quantity, HA testing option,a nd other variables. An LCC model and sample problem are included to illustrate the key results. Following the results of the trade studies, limitations of the simplified cost model are presented, the relationship of these results to current procurement practices are discussed, and the application of the results to modern military and commercial systems is discussed

  16. Externalities of fuel cycles 'ExternE' project. Oil fuel cycle. Estimation of physical impacts and monetary valuation for priority impact pathways

    International Nuclear Information System (INIS)

    Friedrich, R.; Krewitt, W.; Mayerhofer, P.; Trukenmueller, A.; Gressmann, A.; Runte, K.-H.; Kortum, G.; Weltschev, M.

    1994-01-01

    principal objectives: - to quantify the external costs and benefits of the major fuel cycles for electricity generation and conservation, using the best available methods and information; - to adopt a common framework for assessment of fuel cycles, in order that a fair comparison can be made between them, and - to make recommendations on areas in which further research is required in order that future estimates of damages can be made with greater confidence. Within the study the following fuel cycles for electricity generation will be assessed: coal, uranium, lignite, oil, gas, wind, photovoltaics, biomass, small scale hydroelectric projects and energy conservation. The project started by considering the coal and the nuclear fuel cycles. The methodological framework established during the work on these two fuel cycles now has to be modified and transferred to other fuel cycles to demonstrate the general applicability of the accounting framework and to guarantee a consistent analysis of various fuel cycles

  17. Externalities of fuel cycles 'ExternE' project. Lignite fuel cycle. Estimation of physical impacts and monetary valuation for priority impact pathways

    International Nuclear Information System (INIS)

    Friedrich, R.; Krewitt, W.; Mayerhofer, P.; Trukenmueller, A.; Gressmann, A.

    1994-01-01

    principal objectives: - to quantify the external costs and benefits of the major fuel cycles for electricity generation and conservation, using the best available methods and information, - to adopt a common framework for assessment of fuel cycles, in order that a fair comparison can be made between them, and - to make recommendations on areas in which further research is required in order that future estimates of damages can be made with greater confidence. Within the study the following fuel cycles for electricity generation will be assessed: coal, uranium, lignite, oil, gas, wind, photovoltaics, biomass, small scale hydroelectric projects and energy conservation. The project started by considering the coal and the nuclear fuel cycles. The methodological framework established during the work on these two fuel cycles now has to be modified and transferred to other fuel cycles to demonstrate the general applicability of the accounting framework and to guarantee a consistent analysis of various fuel cycles

  18. Analysis of the total system life cycle cost for the Civilian Radioactive Waste Management Program. Volume 1. The analysis and its results

    International Nuclear Information System (INIS)

    1986-04-01

    The total-system life-cycle cost (TSLCC) analysis for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program is an ongoing activity that helps determine whether the revenue-producing mechanism established by the Nuclear Waste Policy Act of 1982 is sufficient to cover the cost of the program. This report provides cost estimates for the fourth evaluation of the adequacy of the fee. The total-system cost for the reference authorized-system program is estimated to be 24 to 32 billion (1985) dollars. The total-system cost for the reference improved-performance system is estimated to be 26 to 34 billion dollars. A number of sensitivity cases were analyzed. For the authorized system, the costs for the sensitivity cases studied range from 21 to 39 billion dollars. For the improved-performance system, which includes a facility for monitored retrievable storage, the total-system cost in the sensitivity cases is estimated to be as high as 41 billion dollars. The factors that affect costs more than any other single factor for both the authorized and the improved-performance systems are delays in repository startup. A preliminary analysis of the impact of extending the burnup of nuclear fuel in the reactor was also performed; its results indicate that the impact is insignificant: the total-system cost is essentially unchanged from the comparable constant-burnup cases. The current estimate of the the total-system cost for the reference authorized system is zero to 3 billion dollars (9%) higher than the estimate for the reference system in the January 1985 TSLCC analysis

  19. Computerized cost estimation spreadsheet and cost data base for fusion devices

    International Nuclear Information System (INIS)

    Hamilton, W.R.; Rothe, K.E.

    1985-01-01

    Component design parameters (weight, surface area, etc.) and cost factors are input and direct and indirect costs are calculated. The cost data base file derived from actual cost experience within the fusion community and refined to be compatible with the spreadsheet costing approach is a catalog of cost coefficients, algorithms, and component costs arranged into data modules corresponding to specific components and/or subsystems. Each data module contains engineering, equipment, and installation labor cost data for different configurations and types of the specific component or subsystem. This paper describes the assumptions, definitions, methodology, and architecture incorporated in the development of the cost estimation spreadsheet and cost data base, along with the type of input required and the output format

  20. Contingency Cost estimation for Research reactor Decommissioning

    International Nuclear Information System (INIS)

    Jin, Hyung Gon; Hong, Yun Jeong

    2016-01-01

    There are many types of cost items in decommissioning cost estimation, however, contingencies are for unforeseen elements of cost within the defined project scope. Regulatory body wants to reasonable quantification for this issue. Many countries have adopted the breakdown of activity dependent and period-dependent costs to structure their estimates. Period-dependent costs could be broken down into defined time frames to reduce overall uncertainties. Several countries apply this notion by having different contingency factors for different phases of the project. This study is a compilation of contingency cost of research reactor and for each country. Simulation techniques using TRIM, MATLAB, and PSpice can be useful tools for designing detector channels. Thus far TRIM, MATLAB and PSpice have been used to calculate the detector current output pulse for SiC semiconductor detectors and to model the pulses that propagate through potential detector channels. This model is useful for optimizing the detector and the resolution for application to neutron monitoring in the Generation IV power reactors

  1. Contingency Cost estimation for Research reactor Decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Jin, Hyung Gon; Hong, Yun Jeong [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    There are many types of cost items in decommissioning cost estimation, however, contingencies are for unforeseen elements of cost within the defined project scope. Regulatory body wants to reasonable quantification for this issue. Many countries have adopted the breakdown of activity dependent and period-dependent costs to structure their estimates. Period-dependent costs could be broken down into defined time frames to reduce overall uncertainties. Several countries apply this notion by having different contingency factors for different phases of the project. This study is a compilation of contingency cost of research reactor and for each country. Simulation techniques using TRIM, MATLAB, and PSpice can be useful tools for designing detector channels. Thus far TRIM, MATLAB and PSpice have been used to calculate the detector current output pulse for SiC semiconductor detectors and to model the pulses that propagate through potential detector channels. This model is useful for optimizing the detector and the resolution for application to neutron monitoring in the Generation IV power reactors.

  2. Cost estimating relationships for nuclear power plant operationa and maintenance

    International Nuclear Information System (INIS)

    Bowers, H.I.; Fuller, L.C.; Myers, M.L.

    1987-11-01

    Revised cost estimating relationships for 1987 are presented for estimating annual nonfuel operation and maintenance (O and M) costs for light-water reactor (LWR) nuclear power plants, which update guidelines published previously in 1982. The purpose of these cost estimating relationships is for use in long range planning and evaluations of the economics of nuclear energy for electric power generation. A listing of a computer program, LWROM, implementing the cost estimating relationships and written in advanced BASIC for IBM personal computers, is included

  3. The external costs of the nuclear fuel cycle: implementation in France

    International Nuclear Information System (INIS)

    Dreicer, M.; Tort, V.; Margerie, H.

    1995-08-01

    In 1991 the European Community and the US Department of Energy initiated a joint research project to assess the external costs of fuel cycles used to generate electricity. The intention of this project, called the EC-US External Costs of Fuel Cycles Project (ECFC), was to develop a conceptual approach, consistent methodology and identify future research in the assessment of the externalities. A second phase of the project continued in Europe (with a new name ''ExternE'') and expanded to include the implementation of the consistent methodology in various EC countries. This report presents the final results of the French Implementation for the nuclear fuel cycle. (author). 37 refs., 11 figs., 24 tabs

  4. The external costs of the nuclear fuel cycle: implementation in France

    Energy Technology Data Exchange (ETDEWEB)

    Dreicer, M.; Tort, V.; Margerie, H.

    1995-08-01

    In 1991 the European Community and the US Department of Energy initiated a joint research project to assess the external costs of fuel cycles used to generate electricity. The intention of this project, called the EC-US External Costs of Fuel Cycles Project (ECFC), was to develop a conceptual approach, consistent methodology and identify future research in the assessment of the externalities. A second phase of the project continued in Europe (with a new name ``ExternE``) and expanded to include the implementation of the consistent methodology in various EC countries. This report presents the final results of the French Implementation for the nuclear fuel cycle. (author). 37 refs., 11 figs., 24 tabs.

  5. The effect of life-cycle cost disclosure on consumer behavior

    Science.gov (United States)

    Deutsch, Matthias

    For more than 20 years, analysts have reported on the so-called "energy paradox" or the "energy efficiency gap", referring to the fact that economic agents could in principle lower their total cost at current prices by using more energy-efficient technology but, nevertheless, often decide not to do so. Theory suggests that providing information in a simplified way could potentially reduce this "efficiency gap". Such simplification may be achieved by providing the estimated monetary operating cost and life-cycle cost (LCC) of a given appliance---which has been a recurring theme within the energy policy and efficiency labeling community. Yet, little is known so far about the causal effects of LCC disclosure on consumer action because of the gap between the acquisition of efficiency information and consumer purchasing behavior in the real marketplace. This dissertation bridges the gap by experimentally integrating LCC disclosure into two major German commercial websites---a price comparison engine for cooling appliances, and an online shop for washing machines. Internet users arriving on these websites were randomly assigned to two experimental groups, and the groups were exposed to different visual stimuli. The control group received regular product price information, whereas the treatment group was, in addition, offered information about operating cost and total LCC. Click-stream data of consumers' shopping behavior was evaluated with multiple regression analysis by controlling for several product characteristics. This dissertation finds that LCC disclosure reduces the mean energy use of chosen cooling appliances by 2.5% (p<0.01), and the energy use of chosen washing machines by 0.8% (p<0.001). For the latter, it also reduces the mean water use by 0.7% (p<0.05). These effects suggest a potential role for public policy in promoting LCC disclosure. While I do not attempt to estimate the costs of such a policy, a simple quantification shows that the benefits amount to

  6. Cost estimation for decommissioning: a review of current practice

    International Nuclear Information System (INIS)

    O'Sullivan, P.; Pescatore, C.

    2009-01-01

    It is now common practice for decommissioning plans and associated cost estimates to be prepared for all nuclear installations. Specific requirements are generally set out in regulations that have their basis in national legislation. These estimates are important for ensuring that the necessary funds are being collected to cover the actual costs of decommissioning the facility. The long time horizon for both amassing and disbursing these funds is a particular concern for national authorities. It is thus important to maintain a realistic estimate of the liabilities involved and to confirm the adequacy of the provisions to discharge them over time. Estimates of decommissioning costs have been performed and published by many organisations for many different purposes and applications. The results often vary because of differences in basic assumptions such as the choice of the decommissioning strategy (immediate vs. deferred), the availability of waste management pathways, the assumed end states of installations, the detailed definition of cost items, technical uncertainties, unforeseen events, the evolution of regulation and requirements. Many of these differences may be unavoidable since a reasonable degree of reliability and accuracy can only be achieved by developing decommissioning cost estimates on a case-by-case, site-specific basis. Moreover, even if considerable efforts are made to obtain reliable estimates, unforeseen events may cause estimates to go wrong. The issue of how to deal with uncertainties is therefore an important one, leading in turn to the need for risk management in terms of making adequate funding provisions. In March 2008, a questionnaire was circulated among the organisations participating in the NEA Decommissioning and Cost Estimation Group (DCEG). Information was collected on legal requirements and the responsibilities of the main parties concerned with the preparation and oversight of cost estimates, the main cost elements and associated

  7. Valuing productivity costs in a changing macroeconomic environment: the estimation of colorectal cancer productivity costs using the friction cost approach.

    Science.gov (United States)

    Hanly, Paul; Koopmanschap, Marc; Sharp, Linda

    2016-06-01

    The friction cost approach (FCA) has been proposed as an alternative to the human capital approach for productivity cost valuation. However, FCA estimates are context dependent and influenced by extant macroeconomic conditions. We applied the FCA to estimate colorectal cancer labor productivity costs and assessed the impact of a changing macroeconomic environment on these estimates. Data from colorectal cancer survivors (n = 159) derived from a postal survey undertaken in Ireland March 2010 to January 2011 were combined with national wage data, population-level survival data, and occupation-specific friction periods to calculate temporary and permanent disability, and premature mortality costs using the FCA. The effects of changing labor market conditions between 2006 and 2013 on the friction period were modeled in scenario analyses. Costs were valued in 2008 euros. In the base-case, the total FCA per-person productivity cost for incident colorectal cancer patients of working age at diagnosis was €8543. In scenario 1 (a 2.2 % increase in unemployment), the fall in the friction period caused total productivity costs to decrease by up to 18 % compared to base-case estimates. In scenario 2 (a 9.2 % increase in unemployment), the largest decrease in productivity cost was up to 65 %. Adjusting for the vacancy rate reduced the effect of unemployment on the cost results. The friction period used in calculating labor productivity costs greatly affects the derived estimates; this friction period requires reassessment following changes in labor market conditions. The influence of changes in macroeconomic conditions on FCA-derived cost estimates may be substantial.

  8. Estimated Annual Maintenance Costs for Educational Facilities in Eritrea

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    Global estimated annual costs for undertaking basic maintenance of all educational facilities in Eritrea.......Global estimated annual costs for undertaking basic maintenance of all educational facilities in Eritrea....

  9. Estimating the opportunity costs of bed-days.

    Science.gov (United States)

    Sandmann, Frank G; Robotham, Julie V; Deeny, Sarah R; Edmunds, W John; Jit, Mark

    2018-03-01

    Opportunity costs of bed-days are fundamental to understanding the value of healthcare systems. They greatly influence burden of disease estimations and economic evaluations involving stays in healthcare facilities. However, different estimation techniques employ assumptions that differ crucially in whether to consider the value of the second-best alternative use forgone, of any available alternative use, or the value of the actually chosen alternative. Informed by economic theory, this paper provides a taxonomic framework of methodologies for estimating the opportunity costs of resources. This taxonomy is then applied to bed-days by classifying existing approaches accordingly. We highlight differences in valuation between approaches and the perspective adopted, and we use our framework to appraise the assumptions and biases underlying the standard approaches that have been widely adopted mostly unquestioned in the past, such as the conventional use of reference costs and administrative accounting data. Drawing on these findings, we present a novel approach for estimating the opportunity costs of bed-days in terms of health forgone for the second-best patient, but expressed monetarily. This alternative approach effectively re-connects to the concept of choice and explicitly considers net benefits. It is broadly applicable across settings and for other resources besides bed-days. © 2017 The Authors Health Economics published by John Wiley & Sons Ltd.

  10. Cost estimate guidelines for advanced nuclear power technologies

    International Nuclear Information System (INIS)

    Delene, J.G.; Hudson, C.R. II.

    1990-03-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies. 10 refs., 8 figs., 32 tabs

  11. Estimation of 18FDG doses's cost

    International Nuclear Information System (INIS)

    Hamza, Fatma; Amouri, W.; Jardak, I.; Kallel, F.; Charfeddine, S.; Guermazi, F.

    2013-01-01

    The cyclotron facility, essentially for medical use, is far from being a simple establishment of a dedicated device to accelerate particles producing a beta plus emitter radioelement. The cyclotron site encompasses more over all necessary equipments for the production and the quality control of considered radiotracer that 18 FDG is just one example. This facility is subject to strict standards in terms of radiopharmaceutical production, radiation level, pressure level and airflow resulting in the production of a drug submitted to the MA (Marketing Authorization). These multiple factors directly influence the final cost of the dose that remains to be reachable by the patient. The aim of this work is to estimate the cost of a dose of 18 FDG to ensure financial viability of the project while accessible to the patient. The cost of the facility will entail the following: buildings and utilities, equipment and operational cost. This calculation is possible only if we define in advance the type of cyclotron, which is bound to the market needs in particular the number of PET facilities, the number of scans per day and the radioactive decay of radioelement. Our study represents a simulation that considers some hypothesis. We assumed that the cyclotron is installed in Sousse and that the PET facilities number (positon emission tomography) is 6 in which 4 are located 2 hours away. For a PET scan, the average dose per patient is about 350 MBq (5 MBq/kg) and the exam duration is about 45 minutes. Each center performs 10 tests per day. In terms of fees, we considered device and building's cost, facility amortization, consumables (target, marking accessories), maintenance, remuneration expense and the annual electricity consumption. All our calculations have been reported to the number of working days per year. The estimates were made outside the customs duties and technical assistance that may last up to 2 years. Requirements and needs were estimated at 5.4 curies per day. For

  12. Estimating Maintenance Cost for Web Applications

    Directory of Open Access Journals (Sweden)

    Ion IVAN

    2016-01-01

    Full Text Available The current paper tackles the issue of determining a method for estimating maintenance costs for web applications. The current state of research in the field of web application maintenance is summarized and leading theories and results are highlighted. The cost of web maintenance is determined by the number of man-hours invested in maintenance tasks. Web maintenance tasks are categorized into content maintenance and technical maintenance. Research is centered on analyzing technical maintenance tasks. The research hypothesis is formulated on the assumption that the number of man-hours invested in maintenance tasks can be assessed based on the web application’s user interaction level, complexity and content update effort. Data regarding the costs of maintenance tasks is collected from 24 maintenance projects implemented by a web development company that tackles a wide area of web applications. Homogeneity and diversity of collected data is submitted for debate by presenting a sample of the data and depicting the overall size and comprehensive nature of the entire dataset. A set of metrics dedicated to estimating maintenance costs in web applications is defined based on conclusions formulated by analyzing the collected data and the theories and practices dominating the current state of research. Metrics are validated with regards to the initial research hypothesis. Research hypothesis are validated and conclusions are formulated on the topic of estimating the maintenance cost of web applications. The limits of the research process which represented the basis for the current paper are enunciated. Future research topics are submitted for debate.

  13. Junction temperature estimation for an advanced active power cycling test

    DEFF Research Database (Denmark)

    Choi, Uimin; Blaabjerg, Frede; Jørgensen, S.

    2015-01-01

    estimation method using on-state VCE for an advanced active power cycling test is proposed. The concept of the advanced power cycling test is explained first. Afterwards the junction temperature estimation method using on-state VCE and current is presented. Further, the method to improve the accuracy...... of the maximum junction temperature estimation is also proposed. Finally, the validity and effectiveness of the proposed method is confirmed by experimental results.......On-state collector-emitter voltage (VCE) is a good indicator to determine the wear-out condition of power device modules. Further, it is a one of the Temperature Sensitive Electrical Parameters (TSEPs) and thus can be used for junction temperature estimation. In this paper, the junction temperature...

  14. Estimating the economic cost of disability in Ireland

    OpenAIRE

    Cullinan, John; Gannon, Brenda; Lyons, Seán

    2008-01-01

    Addressing the extra economic costs of disability seems a logical step towards alleviating elements of social exclusion for people with disabilities. This paper estimates the economic cost of disability in Ireland in terms of the additional spending needs that arise due to disability. It defines and estimates models of the private costs borne by families with individuals who have a disability in Ireland when compared to the wider population, both in general and by severity of illness. Our mod...

  15. A Probabilistic Cost Estimation Model for Unexploded Ordnance Removal

    National Research Council Canada - National Science Library

    Poppe, Peter

    1999-01-01

    ...) contaminated sites that the services must decontaminate. Existing models for estimating the cost of UXO removal often require a high level of expertise and provide only a point estimate for the costs...

  16. Cost Probability Analysis of China's Nuclear Fuel Cycle Transition

    International Nuclear Information System (INIS)

    Gao, R. X.; Ko, W. I.; Lee, S. H.

    2015-01-01

    The Chinese government has already determined to develop the closed nuclear fuel cycle, its long-term roadmap of spent fuel management has not been decided yet. Currently, it seems that China's booming economy gives abundant financial assurance to develop nuclear programs in full play according to its near-term national plans. However, the viability and sustainability of nuclear power always depends critically on its economics. Therefore, it is necessary to conduct a well focused cost-benefit and objective analysis of China's ongoing nuclear power programs with the future prospects. In this study, we conduct a comparative analysis of electricity generation cost in four reference nuclear fuel cycle transition scenarios by 2050. Direct disposal is assumed to produce the cheapest LCT as low as 62.688 mills/kWh compared to the other options. However, after performing a relative uncertainty study, the results show that the capital cost of reactor is the key cost component which leads to the cost gap

  17. Cost Probability Analysis of China's Nuclear Fuel Cycle Transition

    Energy Technology Data Exchange (ETDEWEB)

    Gao, R. X. [Univ. of Science and Technology, Daejeon (Korea, Republic of); Ko, W. I.; Lee, S. H. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-05-15

    The Chinese government has already determined to develop the closed nuclear fuel cycle, its long-term roadmap of spent fuel management has not been decided yet. Currently, it seems that China's booming economy gives abundant financial assurance to develop nuclear programs in full play according to its near-term national plans. However, the viability and sustainability of nuclear power always depends critically on its economics. Therefore, it is necessary to conduct a well focused cost-benefit and objective analysis of China's ongoing nuclear power programs with the future prospects. In this study, we conduct a comparative analysis of electricity generation cost in four reference nuclear fuel cycle transition scenarios by 2050. Direct disposal is assumed to produce the cheapest LCT as low as 62.688 mills/kWh compared to the other options. However, after performing a relative uncertainty study, the results show that the capital cost of reactor is the key cost component which leads to the cost gap.

  18. 40 CFR 261.142 - Cost estimate.

    Science.gov (United States)

    2010-07-01

    ... hazardous waste, and the potential cost of closing the facility as a treatment, storage, and disposal... facility. (3) The cost estimate may not incorporate any salvage value that may be realized with the sale of... no later than 30 days after a change in a facility's operating plan or design that would increase the...

  19. A Framework for Statewide Analysis of Site Suitability, Energy Estimation, Life Cycle Costs, Financial Feasibility and Environmental Assessment of Wind Farms: A Case Study of Indiana

    Science.gov (United States)

    Kumar, Indraneel

    In the last decade, Midwestern states including Indiana have experienced an unprecedented growth in utility scale wind energy farms. For example, by end of 2013, Indiana had 1.5 GW of wind turbines installed, which could provide electrical energy for as many as half-a-million homes. However, there is no statewide systematic framework available for the evaluation of wind farm impacts on endangered species, required necessary setbacks and proximity standards to infrastructure, and life cycle costs. This research is guided to fill that gap and it addresses the following questions. How much land is suitable for wind farm siting in Indiana given the constraints of environmental, ecological, cultural, settlement, physical infrastructure and wind resource parameters? How much wind energy can be obtained? What are the life cycle costs and economic and financial feasibility? Is wind energy production and development in a state an emission free undertaking? The framework developed in the study is applied to a case study of Indiana. A fuzzy logic based AHP (Analytic Hierarchy Process) spatial site suitability analysis for wind energy is formulated. The magnitude of wind energy that could be sited and installed comprises input for economic and financial feasibility analysis for 20-25 years life cycle of wind turbines in Indiana. Monte Carlo simulation is used to account for uncertainty and nonlinearity in various costs and price parameters. Impacts of incentives and cost variables such as production tax credits, costs of capital, and economies of scale are assessed. Further, an economic input-output (IO) based environmental assessment model is developed for wind energy, where costs from financial feasibility analysis constitute the final demand vectors. This customized model for Indiana is used to assess emissions for criteria air pollutants, hazardous air pollutants and greenhouse gases (GHG) across life cycle events of wind turbines. The findings of the case study include

  20. 16 CFR 305.5 - Determinations of estimated annual energy consumption, estimated annual operating cost, and...

    Science.gov (United States)

    2010-01-01

    ... consumption, estimated annual operating cost, and energy efficiency rating, and of water use rate. 305.5... RULE CONCERNING DISCLOSURES REGARDING ENERGY CONSUMPTION AND WATER USE OF CERTAIN HOME APPLIANCES AND... § 305.5 Determinations of estimated annual energy consumption, estimated annual operating cost, and...

  1. Project Cost Estimation for Planning

    Science.gov (United States)

    2010-02-26

    For Nevada Department of Transportation (NDOT), there are far too many projects that ultimately cost much more than initially planned. Because project nominations are linked to estimates of future funding and the analysis of system needs, the inaccur...

  2. Waste Management Facilities cost information for low-level waste

    Energy Technology Data Exchange (ETDEWEB)

    Shropshire, D.; Sherick, M.; Biadgi, C.

    1995-06-01

    This report contains preconceptual designs and planning level life-cycle cost estimates for managing low-level waste. The report`s information on treatment, storage, and disposal modules can be integrated to develop total life-cycle costs for various waste management options. A procedure to guide the US Department of Energy and its contractor personnel in the use of cost estimation data is also summarized in this report.

  3. Hanford River Protection Project Life cycle Cost Modeling Tool to Enhance Mission Planning - 13396

    International Nuclear Information System (INIS)

    Dunford, Gary; Williams, David; Smith, Rick

    2013-01-01

    The Life cycle Cost Model (LCM) Tool is an overall systems model that incorporates budget, and schedule impacts for the entire life cycle of the River Protection Project (RPP) mission, and is replacing the Hanford Tank Waste Operations Simulator (HTWOS) model as the foundation of the RPP system planning process. Currently, the DOE frequently requests HTWOS simulations of alternative technical and programmatic strategies for completing the RPP mission. Analysis of technical and programmatic changes can be performed with HTWOS; however, life cycle costs and schedules were previously generated by manual transfer of time-based data from HTWOS to Primavera P6. The LCM Tool automates the preparation of life cycle costs and schedules and is needed to provide timely turnaround capability for RPP mission alternative analyses. LCM is the simulation component of the LCM Tool. The simulation component is a replacement of the HTWOS model with new capability to support life cycle cost modeling. It is currently deployed in G22, but has been designed to work in any full object-oriented language with an extensive feature set focused on networking and cross-platform compatibility. The LCM retains existing HTWOS functionality needed to support system planning and alternatives studies going forward. In addition, it incorporates new functionality, coding improvements that streamline programming and model maintenance, and capability to input/export data to/from the LCM using the LCM Database (LCMDB). The LCM Cost/Schedule (LCMCS) contains cost and schedule data and logic. The LCMCS is used to generate life cycle costs and schedules for waste retrieval and processing scenarios. It uses time-based output data from the LCM to produce the logic ties in Primavera P6 necessary for shifting activities. The LCM Tool is evolving to address the needs of decision makers who want to understand the broad spectrum of risks facing complex organizations like DOE-RPP to understand how near

  4. Hanford River Protection Project Life cycle Cost Modeling Tool to Enhance Mission Planning - 13396

    Energy Technology Data Exchange (ETDEWEB)

    Dunford, Gary [AEM Consulting, LLC, 1201 Jadwin Avenue, Richland, WA 99352 (United States); Williams, David [WIT, Inc., 11173 Oak Fern Court, San Diego, CA 92131 (United States); Smith, Rick [Knowledge Systems Design, Inc., 13595 Quaker Hill Cross Rd, Nevada City, CA 95959 (United States)

    2013-07-01

    The Life cycle Cost Model (LCM) Tool is an overall systems model that incorporates budget, and schedule impacts for the entire life cycle of the River Protection Project (RPP) mission, and is replacing the Hanford Tank Waste Operations Simulator (HTWOS) model as the foundation of the RPP system planning process. Currently, the DOE frequently requests HTWOS simulations of alternative technical and programmatic strategies for completing the RPP mission. Analysis of technical and programmatic changes can be performed with HTWOS; however, life cycle costs and schedules were previously generated by manual transfer of time-based data from HTWOS to Primavera P6. The LCM Tool automates the preparation of life cycle costs and schedules and is needed to provide timely turnaround capability for RPP mission alternative analyses. LCM is the simulation component of the LCM Tool. The simulation component is a replacement of the HTWOS model with new capability to support life cycle cost modeling. It is currently deployed in G22, but has been designed to work in any full object-oriented language with an extensive feature set focused on networking and cross-platform compatibility. The LCM retains existing HTWOS functionality needed to support system planning and alternatives studies going forward. In addition, it incorporates new functionality, coding improvements that streamline programming and model maintenance, and capability to input/export data to/from the LCM using the LCM Database (LCMDB). The LCM Cost/Schedule (LCMCS) contains cost and schedule data and logic. The LCMCS is used to generate life cycle costs and schedules for waste retrieval and processing scenarios. It uses time-based output data from the LCM to produce the logic ties in Primavera P6 necessary for shifting activities. The LCM Tool is evolving to address the needs of decision makers who want to understand the broad spectrum of risks facing complex organizations like DOE-RPP to understand how near

  5. Estimating productivity costs using the friction cost approach in practice: a systematic review.

    Science.gov (United States)

    Kigozi, Jesse; Jowett, Sue; Lewis, Martyn; Barton, Pelham; Coast, Joanna

    2016-01-01

    The choice of the most appropriate approach to valuing productivity loss has received much debate in the literature. The friction cost approach has been proposed as a more appropriate alternative to the human capital approach when valuing productivity loss, although its application remains limited. This study reviews application of the friction cost approach in health economic studies and examines how its use varies in practice across different country settings. A systematic review was performed to identify economic evaluation studies that have estimated productivity costs using the friction cost approach and published in English from 1996 to 2013. A standard template was developed and used to extract information from studies meeting the inclusion criteria. The search yielded 46 studies from 12 countries. Of these, 28 were from the Netherlands. Thirty-five studies reported the length of friction period used, with only 16 stating explicitly the source of the friction period. Nine studies reported the elasticity correction factor used. The reported friction cost approach methods used to derive productivity costs varied in quality across studies from different countries. Few health economic studies have estimated productivity costs using the friction cost approach. The estimation and reporting of productivity costs using this method appears to differ in quality by country. The review reveals gaps and lack of clarity in reporting of methods for friction cost evaluation. Generating reporting guidelines and country-specific parameters for the friction cost approach is recommended if increased application and accuracy of the method is to be realized.

  6. Compatibility analysis of DUPIC fuel (part5) - DUPIC fuel cycle economics analysis

    Energy Technology Data Exchange (ETDEWEB)

    Ko, Won Il; Choi, Hang Bok; Yang, Myung Seung

    2000-08-01

    This study examines the economics of the DUPIC fuel cycle using unit costs of fuel cycle components estimated based on conceptual designs. The fuel cycle cost (FCC) was calculated by a deterministic method in which reference values of fuel cycle components are used. The FCC was then analyzed by a Monte Carlo simulation to get the uncertainty of the FCC associated with the unit costs of the fuel cycle components. From the deterministic analysis on the one-batch equilibrium fuel cycle model, the DUPIC FCC was estimated to be 6.55-6.72 mills/kWh for proposed DUPIC fuel options, which is a little smaller than that of the once-through FCC by 0.04-0.28 mills/kWh. Considering the uncertainty (0.45-0.51 mills/kWh) of the FCC estimated by the Monte Carlo simulation method, the cost difference between the DUPIC and once-through fuel cycle is negligible. On the other hand, the material balance calculation has shown that the DUPIC fuel cycle can save natural uranium resources by -20% and reduce the spent fuel arising by -65%, compared with the once-through fuel cycle. In conclusion, the DUPIC fuel cycle possesses a strong advantage over the once-through fuel cycle from the viewpoint of the environmental effect.

  7. Compatibility analysis of DUPIC fuel (part5) - DUPIC fuel cycle economics analysis

    International Nuclear Information System (INIS)

    Ko, Won Il; Choi, Hang Bok; Yang, Myung Seung

    2000-08-01

    This study examines the economics of the DUPIC fuel cycle using unit costs of fuel cycle components estimated based on conceptual designs. The fuel cycle cost (FCC) was calculated by a deterministic method in which reference values of fuel cycle components are used. The FCC was then analyzed by a Monte Carlo simulation to get the uncertainty of the FCC associated with the unit costs of the fuel cycle components. From the deterministic analysis on the one-batch equilibrium fuel cycle model, the DUPIC FCC was estimated to be 6.55-6.72 mills/kWh for proposed DUPIC fuel options, which is a little smaller than that of the once-through FCC by 0.04-0.28 mills/kWh. Considering the uncertainty (0.45-0.51 mills/kWh) of the FCC estimated by the Monte Carlo simulation method, the cost difference between the DUPIC and once-through fuel cycle is negligible. On the other hand, the material balance calculation has shown that the DUPIC fuel cycle can save natural uranium resources by -20% and reduce the spent fuel arising by -65%, compared with the once-through fuel cycle. In conclusion, the DUPIC fuel cycle possesses a strong advantage over the once-through fuel cycle from the viewpoint of the environmental effect

  8. Method for developing cost estimates for generic regulatory requirements

    International Nuclear Information System (INIS)

    1985-01-01

    The NRC has established a practice of performing regulatory analyses, reflecting costs as well as benefits, of proposed new or revised generic requirements. A method had been developed to assist the NRC in preparing the types of cost estimates required for this purpose and for assigning priorities in the resolution of generic safety issues. The cost of a generic requirement is defined as the net present value of total lifetime cost incurred by the public, industry, and government in implementing the requirement for all affected plants. The method described here is for commercial light-water-reactor power plants. Estimating the cost for a generic requirement involves several steps: (1) identifying the activities that must be carried out to fully implement the requirement, (2) defining the work packages associated with the major activities, (3) identifying the individual elements of cost for each work package, (4) estimating the magnitude of each cost element, (5) aggregating individual plant costs over the plant lifetime, and (6) aggregating all plant costs and generic costs to produce a total, national, present value of lifetime cost for the requirement. The method developed addresses all six steps. In this paper, we discuss on the first three

  9. Cost estimate of electricity produced by TPV

    Science.gov (United States)

    Palfinger, Günther; Bitnar, Bernd; Durisch, Wilhelm; Mayor, Jean-Claude; Grützmacher, Detlev; Gobrecht, Jens

    2003-05-01

    A crucial parameter for the market penetration of TPV is its electricity production cost. In this work a detailed cost estimate is performed for a Si photocell based TPV system, which was developed for electrically self-powered operation of a domestic heating system. The results are compared to a rough estimate of cost of electricity for a projected GaSb based system. For the calculation of the price of electricity, a lifetime of 20 years, an interest rate of 4.25% per year and maintenance costs of 1% of the investment are presumed. To determine the production cost of TPV systems with a power of 12-20 kW, the costs of the TPV components and 100 EUR kW-1el,peak for assembly and miscellaneous were estimated. Alternatively, the system cost for the GaSb system was derived from the cost of the photocells and from the assumption that they account for 35% of the total system cost. The calculation was done for four different TPV scenarios which include a Si based prototype system with existing technology (etasys = 1.0%), leading to 3000 EUR kW-1el,peak, an optimized Si based system using conventional, available technology (etasys = 1.5%), leading to 900 EUR kW-1el,peak, a further improved system with future technology (etasys = 5%), leading to 340 EUR kW-1el,peak and a GaSb based system (etasys = 12.3% with recuperator), leading to 1900 EUR kW-1el,peak. Thus, prices of electricity from 6 to 25 EURcents kWh-1el (including gas of about 3.5 EURcents kWh-1) were calculated and compared with those of fuel cells (31 EURcents kWh-1) and gas engines (23 EURcents kWh-1).

  10. Innovation in the pharmaceutical industry: New estimates of R&D costs.

    Science.gov (United States)

    DiMasi, Joseph A; Grabowski, Henry G; Hansen, Ronald W

    2016-05-01

    The research and development costs of 106 randomly selected new drugs were obtained from a survey of 10 pharmaceutical firms. These data were used to estimate the average pre-tax cost of new drug and biologics development. The costs of compounds abandoned during testing were linked to the costs of compounds that obtained marketing approval. The estimated average out-of-pocket cost per approved new compound is $1395 million (2013 dollars). Capitalizing out-of-pocket costs to the point of marketing approval at a real discount rate of 10.5% yields a total pre-approval cost estimate of $2558 million (2013 dollars). When compared to the results of the previous study in this series, total capitalized costs were shown to have increased at an annual rate of 8.5% above general price inflation. Adding an estimate of post-approval R&D costs increases the cost estimate to $2870 million (2013 dollars). Copyright © 2016 Elsevier B.V. All rights reserved.

  11. Estimating pharmacy level prescription drug acquisition costs for third-party reimbursement.

    Science.gov (United States)

    Kreling, D H; Kirk, K W

    1986-07-01

    Accurate payment for the acquisition costs of drug products dispensed is an important consideration in a third-party prescription drug program. Two alternative methods of estimating these costs among pharmacies were derived and compared. First, pharmacists were surveyed to determine the purchase discounts offered to them by wholesalers. A 10.00% modal and 11.35% mean discount resulted for 73 responding pharmacists. Second, cost-plus percents derived from gross profit margins of wholesalers were calculated and applied to wholesaler product costs to estimate pharmacy level acquisition costs. Cost-plus percents derived from National Median and Southwestern Region wholesaler figures were 9.27% and 10.10%, respectively. A comparison showed the two methods of estimating acquisition costs would result in similar acquisition cost estimates. Adopting a cost-plus estimating approach is recommended because it avoids potential pricing manipulations by wholesalers and manufacturers that would negate improvements in drug product reimbursement accuracy.

  12. Unmanned Aerial Vehicles unique cost estimating requirements

    Science.gov (United States)

    Malone, P.; Apgar, H.; Stukes, S.; Sterk, S.

    Unmanned Aerial Vehicles (UAVs), also referred to as drones, are aerial platforms that fly without a human pilot onboard. UAVs are controlled autonomously by a computer in the vehicle or under the remote control of a pilot stationed at a fixed ground location. There are a wide variety of drone shapes, sizes, configurations, complexities, and characteristics. Use of these devices by the Department of Defense (DoD), NASA, civil and commercial organizations continues to grow. UAVs are commonly used for intelligence, surveillance, reconnaissance (ISR). They are also use for combat operations, and civil applications, such as firefighting, non-military security work, surveillance of infrastructure (e.g. pipelines, power lines and country borders). UAVs are often preferred for missions that require sustained persistence (over 4 hours in duration), or are “ too dangerous, dull or dirty” for manned aircraft. Moreover, they can offer significant acquisition and operations cost savings over traditional manned aircraft. Because of these unique characteristics and missions, UAV estimates require some unique estimating methods. This paper describes a framework for estimating UAV systems total ownership cost including hardware components, software design, and operations. The challenge of collecting data, testing the sensitivities of cost drivers, and creating cost estimating relationships (CERs) for each key work breakdown structure (WBS) element is discussed. The autonomous operation of UAVs is especially challenging from a software perspective.

  13. Oil and gas pipeline construction cost analysis and developing regression models for cost estimation

    Science.gov (United States)

    Thaduri, Ravi Kiran

    In this study, cost data for 180 pipelines and 136 compressor stations have been analyzed. On the basis of the distribution analysis, regression models have been developed. Material, Labor, ROW and miscellaneous costs make up the total cost of a pipeline construction. The pipelines are analyzed based on different pipeline lengths, diameter, location, pipeline volume and year of completion. In a pipeline construction, labor costs dominate the total costs with a share of about 40%. Multiple non-linear regression models are developed to estimate the component costs of pipelines for various cross-sectional areas, lengths and locations. The Compressor stations are analyzed based on the capacity, year of completion and location. Unlike the pipeline costs, material costs dominate the total costs in the construction of compressor station, with an average share of about 50.6%. Land costs have very little influence on the total costs. Similar regression models are developed to estimate the component costs of compressor station for various capacities and locations.

  14. Cost Estimation for Research Reactor Decommissioning

    International Nuclear Information System (INIS)

    2013-01-01

    One of the IAEA's statutory objectives is to 'seek to accelerate and enlarge the contribution of atomic energy to peace, health and prosperity throughout the world'. One way this objective is achieved is through the publication of a range of technical series. Two of these are the IAEA Nuclear Energy Series and the IAEA Safety Standards Series. According to Article III.A.6 of the IAEA Statute, the safety standards establish 'standards of safety for protection of health and minimization of danger to life and property.' The safety standards include the Safety Fundamentals, Safety Requirements and Safety Guides. These standards are written primarily in a regulatory style, and are binding on the IAEA for its own programmes. The principal users are the regulatory bodies in Member States and other national authorities. The IAEA Nuclear Energy Series comprises reports designed to encourage and assist R and D on, and application of, nuclear energy for peaceful uses. This includes practical examples to be used by owners and operators of utilities in Member States, implementing organizations, academia, and government officials, among others. This information is presented in guides, reports on technology status and advances, and best practices for peaceful uses of nuclear energy based on inputs from international experts. The IAEA Nuclear Energy Series complements the IAEA Safety Standards Series. The purpose of this publication is to develop a costing methodology and a software tool in order to support cost estimation for research reactor decommissioning. The costing methodology is intended for the preliminary cost estimation stages for research reactor decommissioning with limited inventory data and other input data available. Existing experience in decommissioning costing is considered. As the basis for the cost calculation structure, the costing model uses the International Structure for Decommissioning Costing (ISDC) that is recommended by the IAEA, the Organisation for

  15. Life cycle assessment and life cycle costing of bioethanol from sugarcane in Brazil

    International Nuclear Information System (INIS)

    Luo, Lin; Van der Voet, Ester; Huppes, Gjalt

    2009-01-01

    Brazil has always been the pioneer in the application of bioethanol as a main fuel for automobiles, hence environmental and economic analyses of the Brazilian ethanol industries are of crucial importance. This study presents a comparative life cycle assessment (LCA) on gasoline and ethanol as fuels, and with two types of blends of gasoline with bioethanol, all used in a midsize car. The focus is on a main application in Brazil, sugarcane based ethanol. The results of two cases are presented: base case - bioethanol production from sugarcane and electricity generation from bagasse; future case - bioethanol production from both sugarcane and bagasse and electricity generation from wastes. In both cases sugar is co-produced. The life cycles of fuels include gasoline production, agricultural production of sugarcane, ethanol production, sugar and electricity co-production, blending ethanol with gasoline to produce E10 (10% of ethanol) and E85 (85%), and finally the use of gasoline, E10, E85 and pure ethanol. Furthermore, a life cycle costing (LCC) was conducted to give an indication on fuel economy in both cases. The results show that in the base case less GHG is emitted; while the overall evaluation of these fuel options depends on the importance attached to different impacts. The future case is certainly more economically attractive, which has been the driving force for development in the ethanol industry in Brazil. Nevertheless, the outcomes depend very much on the assumed price for crude oil. In LCC a steady-state cost model was used and only the production cost was taken into account. In the real market the prices of fuels are very much dependent on the taxes and subsidies. Technological development can help in lowering both the environmental impact and the prices of the ethanol fuels. (author)

  16. Social opportunity cost of capital: empirical estimates

    Energy Technology Data Exchange (ETDEWEB)

    Townsend, S.

    1978-02-01

    This report develops estimates of the social-opportunity cost of public capital. The private and social costs of capital are found to diverge primarily because of the effects of corporate and personal income taxes. Following Harberger, the social-opportunity cost of capital is approximated by a weighted average of the returns to different classes of savers and investors where the weights are the flows of savings or investments in each class multiplied by the relevant elasticity. Estimates of these parameters are obtained and the social-opportunity cost of capital is determined to be in the range of 6.2 to 10.8%, depending upon the parameter values used. Uncertainty is found to affect the social-opportunity cost of capital in two ways. First, some allowance must be made for the chance of failure or at least of not realizing claims of a project's proponents. Second, a particular government project will change the expected variability of the returns to the government's entire portfolio of projects. In the absence of specific information about each project, the use of the economy-wide average default and risk adjustments is suggested. These are included in the empirical estimates reported. International capital markets make available private capital, the price of which is not distorted by the U.S. tax system. The inclusion of foreign sources slightly reduces the social-opportunity cost of capital. 21 references.

  17. Estimating the mental health costs of racial discrimination

    Directory of Open Access Journals (Sweden)

    Amanuel Elias

    2016-11-01

    Full Text Available Abstract Background Racial discrimination is a pervasive social problem in several advanced countries such as the U.S., U.K., and Australia. Public health research also indicates a range of associations between exposure to racial discrimination and negative health, particularly, mental health including depression, anxiety, and post-traumatic stress disorder (PTSD. However, the direct negative health impact of racial discrimination has not been costed so far although economists have previously estimated indirect non-health related productivity costs. In this study, we estimate the burden of disease due to exposure to racial discrimination and measure the cost of this exposure. Methods Using prevalence surveys and data on the association of racial discrimination with health outcomes from a global meta-analysis, we apply a cost of illness method to measure the impact of racial discrimination. This estimate indicates the direct health cost attributable to racial discrimination and we convert the estimates to monetary values based on conventional parameters. Results Racial discrimination costs the Australian economy 235,452 in disability adjusted life years lost, equivalent to $37.9 billion per annum, roughly 3.02% of annual gross domestic product (GDP over 2001–11, indicating a sizeable loss for the economy. Conclusion Substantial cost is incurred due to increased prevalence of racial discrimination as a result of its association with negative health outcomes (e.g. depression, anxiety and PTSD. This implies that potentially significant cost savings can be made through measures that target racial discrimination. Our research contributes to the debate on the social impact of racial discrimination, with implications for policies and efforts addressing it.

  18. Cost estimating Brayton and Stirling engines

    Science.gov (United States)

    Fortgang, H. R.

    1980-01-01

    Brayton and Stirling engines were analyzed for cost and selling price for production quantities ranging from 1000 to 400,000 units per year. Parts and components were subjected to indepth scrutiny to determine optimum manufacturing processes coupled with make or buy decisions on materials and small parts. Tooling and capital equipment costs were estimated for each detail and/or assembly. For low annual production volumes, the Brayton engine appears to have a lower cost and selling price than the Stirling Engine. As annual production quantities increase, the Stirling becomes a lower cost engine than the Brayton. Both engines could benefit cost wise if changes were made in materials, design and manufacturing process as annual production quantities increase.

  19. Analytical estimations of limit cycle amplitude for delay-differential equations

    Directory of Open Access Journals (Sweden)

    Tamás Molnár

    2016-09-01

    Full Text Available The amplitude of limit cycles arising from Hopf bifurcation is estimated for nonlinear delay-differential equations by means of analytical formulas. An improved analytical estimation is introduced, which allows more accurate quantitative prediction of periodic solutions than the standard approach that formulates the amplitude as a square-root function of the bifurcation parameter. The improved estimation is based on special global properties of the system: the method can be applied if the limit cycle blows up and disappears at a certain value of the bifurcation parameter. As an illustrative example, the improved analytical formula is applied to the problem of stick balancing.

  20. Cost Estimates and Investment Decisions

    International Nuclear Information System (INIS)

    Emhjellen, Kjetil; Emhjellen Magne; Osmundsen, Petter

    2001-08-01

    When evaluating new investment projects, oil companies traditionally use the discounted cashflow method. This method requires expected cashflows in the numerator and a risk adjusted required rate of return in the denominator in order to calculate net present value. The capital expenditure (CAPEX) of a project is one of the major cashflows used to calculate net present value. Usually the CAPEX is given by a single cost figure, with some indication of its probability distribution. In the oil industry and many other industries, it is common practice to report a CAPEX that is the estimated 50/50 (median) CAPEX instead of the estimated expected (expected value) CAPEX. In this article we demonstrate how the practice of using a 50/50 (median) CAPEX, when the cost distributions are asymmetric, causes project valuation errors and therefore may lead to wrong investment decisions with acceptance of projects that have negative net present values. (author)

  1. Analysis of the total system life cycle cost for the Civilian Radioactive Waste Management Program: Volume 1, The analysis and its results

    International Nuclear Information System (INIS)

    1987-06-01

    This report provides cost estimates for the fifth evaluation of the adequacy of the fee and is consistent with the program strategy and plans. The total-system cost for the reference cases in the improved-performance system is estimated at $32.1 to $38.2 billion (expressed in constant 1986 dollars) over the entire life of the system...or $1.5 to $1.6 billion more than that of the authorized system (i.e., the system without an MRS facility). The current estimate of the total-system cost for the reference cases in the improved-performance system is $3.8 to $5.4 billion higher than the estimate for the same system in the 1986 TSLCC analysis. In the case with the maximum increase, nearly all of the higher cost is due to a $5.2-billion increase in the costs of development and evaluation (D and E); all other system costs are essentially unchanged. The cost difference between the improved-performance system and the authorized system is smaller than the difference estimated in last year's TSLCC analysis. Volume 2 presents the detailed results for the 1987 analysis of the total-system life cycle cost (TSLCC). It consists of four sections: Section A presents the yearly flows of waste between waste-management facilities for the 12 aggregate logistics cases that were studied; Section B presents the annual total-system costs for each of the 30 TSLCC cases by major cost category; Section C presents the annual costs for the disposal of 16,000 canisters of defense high-level waste (DHLW) by major cost category for each of the 30 TSLCC cases; and Section D presents a summary of the cost-allocation factors that were calculated to determine the defense waste share of the total-system costs

  2. Life cycle costing of food waste: A review of methodological approaches.

    Science.gov (United States)

    De Menna, Fabio; Dietershagen, Jana; Loubiere, Marion; Vittuari, Matteo

    2018-03-01

    Food waste (FW) is a global problem that is receiving increasing attention due to its environmental and economic impacts. Appropriate FW prevention, valorization, and management routes could mitigate or avoid these effects. Life cycle thinking and approaches, such as life cycle costing (LCC), may represent suitable tools to assess the sustainability of these routes. This study analyzes different LCC methodological aspects and approaches to evaluate FW management and valorization routes. A systematic literature review was carried out with a focus on different LCC approaches, their application to food, FW, and waste systems, as well as on specific methodological aspects. The review consisted of three phases: a collection phase, an iterative phase with experts' consultation, and a final literature classification. Journal papers and reports were retrieved from selected databases and search engines. The standardization of LCC methodologies is still in its infancy due to a lack of consensus over definitions and approaches. Research on the life cycle cost of FW is limited and generally focused on FW management, rather than prevention or valorization of specific flows. FW prevention, valorization, and management require a consistent integration of LCC and Life Cycle Assessment (LCA) to avoid tradeoffs between environmental and economic impacts. This entails a proper investigation of methodological differences between attributional and consequential modelling in LCC, especially with regard to functional unit, system boundaries, multi-functionality, included cost, and assessed impacts. Further efforts could also aim at finding the most effective and transparent categorization of costs, in particular when dealing with multiple stakeholders sustaining costs of FW. Interpretation of results from LCC of FW should take into account the effect on larger economic systems. Additional key performance indicators and analytical tools could be included in consequential approaches

  3. 48 CFR 1852.216-84 - Estimated cost and incentive fee.

    Science.gov (United States)

    2010-10-01

    ... Provisions and Clauses 1852.216-84 Estimated cost and incentive fee. As prescribed in 1816.406-70(d), insert the following clause: Estimated Cost and Incentive Fee (OCT 1996) The target cost of this contract is $___. The target fee of this contract is $___. The total target cost and target fee as contemplated by the...

  4. Cycling and walking for transport: Estimating net health effects from comparison of different transport mode users' self-reported physical activity.

    Science.gov (United States)

    Veisten, Knut; Flügel, Stefan; Ramjerdi, Farideh; Minken, Harald

    2011-07-20

    separate cycling/walking facilities, and were higher for those with higher education and living in urban areas, while they were lower for those with higher BMI and higher age. Since the share obtaining net health gains might have a huge impact on cost-benefit analysis of new or improved infrastructure for cyclists/pedestrians, it is of importance to estimate this share. A main limitation of our estimation is the cross-sectional design. There is a need for more case studies combining surveys and objective measurement of physical activity changes, preferably before and after the construction of new infrastructure.

  5. Estimating the Cost of Providing Foundational Public Health Services.

    Science.gov (United States)

    Mamaril, Cezar Brian C; Mays, Glen P; Branham, Douglas Keith; Bekemeier, Betty; Marlowe, Justin; Timsina, Lava

    2017-12-28

    To estimate the cost of resources required to implement a set of Foundational Public Health Services (FPHS) as recommended by the Institute of Medicine. A stochastic simulation model was used to generate probability distributions of input and output costs across 11 FPHS domains. We used an implementation attainment scale to estimate costs of fully implementing FPHS. We use data collected from a diverse cohort of 19 public health agencies located in three states that implemented the FPHS cost estimation methodology in their agencies during 2014-2015. The average agency incurred costs of $48 per capita implementing FPHS at their current attainment levels with a coefficient of variation (CV) of 16 percent. Achieving full FPHS implementation would require $82 per capita (CV=19 percent), indicating an estimated resource gap of $34 per capita. Substantial variation in costs exists across communities in resources currently devoted to implementing FPHS, with even larger variation in resources needed for full attainment. Reducing geographic inequities in FPHS may require novel financing mechanisms and delivery models that allow health agencies to have robust roles within the health system and realize a minimum package of public health services for the nation. © Health Research and Educational Trust.

  6. Comparing Methods for Estimating Direct Costs of Adverse Drug Events.

    Science.gov (United States)

    Gyllensten, Hanna; Jönsson, Anna K; Hakkarainen, Katja M; Svensson, Staffan; Hägg, Staffan; Rehnberg, Clas

    2017-12-01

    To estimate how direct health care costs resulting from adverse drug events (ADEs) and cost distribution are affected by methodological decisions regarding identification of ADEs, assigning relevant resource use to ADEs, and estimating costs for the assigned resources. ADEs were identified from medical records and diagnostic codes for a random sample of 4970 Swedish adults during a 3-month study period in 2008 and were assessed for causality. Results were compared for five cost evaluation methods, including different methods for identifying ADEs, assigning resource use to ADEs, and for estimating costs for the assigned resources (resource use method, proportion of registered cost method, unit cost method, diagnostic code method, and main diagnosis method). Different levels of causality for ADEs and ADEs' contribution to health care resource use were considered. Using the five methods, the maximum estimated overall direct health care costs resulting from ADEs ranged from Sk10,000 (Sk = Swedish krona; ~€1,500 in 2016 values) using the diagnostic code method to more than Sk3,000,000 (~€414,000) using the unit cost method in our study population. The most conservative definitions for ADEs' contribution to health care resource use and the causality of ADEs resulted in average costs per patient ranging from Sk0 using the diagnostic code method to Sk4066 (~€500) using the unit cost method. The estimated costs resulting from ADEs varied considerably depending on the methodological choices. The results indicate that costs for ADEs need to be identified through medical record review and by using detailed unit cost data. Copyright © 2017 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.

  7. Cycling efficiency and energy cost of walking in young and older adults.

    Science.gov (United States)

    Gaesser, Glenn A; Tucker, Wesley J; Sawyer, Brandon J; Bhammar, Dharini M; Angadi, Siddhartha S

    2018-02-01

    To determine whether age affects cycling efficiency and the energy cost of walking (Cw), 190 healthy adults, ages 18-81 yr, cycled on an ergometer at 50 W and walked on a treadmill at 1.34 m/s. Ventilation and gas exchange at rest and during exercise were used to calculate net Cw and net efficiency of cycling. Compared with the 18-40 yr age group (2.17 ± 0.33 J·kg -1 ·m -1 ), net Cw was not different in the 60-64 yr (2.20 ± 0.40 J·kg -1 ·m -1 ) and 65-69 yr (2.20 ± 0.28 J·kg -1 ·m -1 ) age groups, but was significantly ( P 60 yr, net Cw was significantly correlated with age ( R 2  = 0.123; P = 0.002). Cycling net efficiency was not different between 18-40 yr (23.5 ± 2.9%), 60-64 yr (24.5 ± 3.6%), 65-69 yr (23.3 ± 3.6%) and ≥70 yr (24.7 ± 2.7%) age groups. Repeat tests on a subset of subjects (walking, n = 43; cycling, n = 37) demonstrated high test-retest reliability [intraclass correlation coefficients (ICC), 0.74-0.86] for all energy outcome measures except cycling net energy expenditure (ICC = 0.54) and net efficiency (ICC = 0.50). Coefficients of variation for all variables ranged from 3.1 to 7.7%. Considerable individual variation in Cw and efficiency was evident, with a ~2-fold difference between the least and most economical/efficient subjects. We conclude that, between 18 and 81 yr, net Cw was only higher for ages ≥70 yr, and that cycling net efficiency was not different across age groups. NEW & NOTEWORTHY This study illustrates that the higher energy cost of walking in older adults is only evident for ages ≥70 yr. For older adults ages 60-69 yr, the energy cost of walking is similar to that of young adults. Cycling efficiency, by contrast, is not different across age groups. Considerable individual variation (∼2-fold) in cycling efficiency and energy cost of walking is observed in young and older adults.

  8. Estimation of the cost of treatment by chemotherapy for early breast cancer in Morocco

    Directory of Open Access Journals (Sweden)

    Boutayeb Saber

    2010-09-01

    Full Text Available Abstract Background Breast cancer is the first cancer in women both in incidence and mortality. The treatment of breast cancer benefited from the progress of chemotherapy and targeted therapies, but there was a parallel increase in treatment costs. Despite a relatively high incidence of many sites of cancer, so far, there is no national register for this disease in Morocco. The main goal of this paper is to estimate the total cost of chemotherapy in the early stages of breast cancer due to its frequency and the chances of patients being cured. This study provides health decision-makers with a first estimate of costs and the opportunity to achieve the optimal use of available data to estimate the needs of antimitotics and trastuzumab in Morocco. Method We start by evaluating the individual cost according to the therapeutic sub-groups, namely: 1. Patients needing chemotherapy with only anthracycline-based therapy. 2. Patients needing chemotherapy with both anthracycline and taxane but without trastuzumab. 3. Patients needing trastuzumab in addition to chemotherapy. For each sub-group, the protocol of treatment is described, and the individual costs per unit, and for the whole cycle, are evaluated. Then we estimate the number of women suffering from breast cancer on the basis of two data bases available in Morocco. Finally, we calculate the total annual cost of treatment of breast cancer in Morocco. Results The total cost of breast cancer in Morocco is given in Moroccan dirhams (MAD, the US dollar at the current exchange rate (MAD 10 = USD 1.30 and in international dollars or purchasing power parity (MAD 10 = PPP 1.95. The cost of a therapy with trastuzumab is 8.4 times the cost of a sequential chemotherapy combining anthracycline and taxane, and nearly 60 times the cost of chemotherapy based on anthracycline alone. Globally, between USD 13.3 million and USD 28.6 million need to be devoted every year by the Moroccan health authorities to treat

  9. NASA Instrument Cost/Schedule Model

    Science.gov (United States)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  10. Seasonal adjustment methods and real time trend-cycle estimation

    CERN Document Server

    Bee Dagum, Estela

    2016-01-01

    This book explores widely used seasonal adjustment methods and recent developments in real time trend-cycle estimation. It discusses in detail the properties and limitations of X12ARIMA, TRAMO-SEATS and STAMP - the main seasonal adjustment methods used by statistical agencies. Several real-world cases illustrate each method and real data examples can be followed throughout the text. The trend-cycle estimation is presented using nonparametric techniques based on moving averages, linear filters and reproducing kernel Hilbert spaces, taking recent advances into account. The book provides a systematical treatment of results that to date have been scattered throughout the literature. Seasonal adjustment and real time trend-cycle prediction play an essential part at all levels of activity in modern economies. They are used by governments to counteract cyclical recessions, by central banks to control inflation, by decision makers for better modeling and planning and by hospitals, manufacturers, builders, transportat...

  11. Monitored Retrievable Storage conceptual system study: open cycle vault

    International Nuclear Information System (INIS)

    Smith, R.I.

    1983-11-01

    This report provides a modified description of the Open Cycle Vault Storage Concept which meets a specified set of requirements; an estimate of the costs of construction, operation, and decommissioning of the concepts; the costs required to expand the facility throughput and storage capability; and the life-cycle costs of the facility. 11 references, 23 figures, 35 tables

  12. Total life-cycle cost analysis of conventional and alternative fueled vehicles

    International Nuclear Information System (INIS)

    Cardullo, M.W.

    1993-01-01

    Total Life-Cycle Cost (TLCC) Analysis can indicate whether paying higher capital costs for advanced technology with low operating and/or environmental costs is advantageous over paying lower capital costs for conventional technology with higher operating and/or environmental costs. While minimizing total life-cycle cost is an important consideration, the consumer often identifies non-cost-related benefits or drawbacks that make more expensive options appear more attractive. The consumer is also likely to heavily weigh initial capital costs while giving limited consideration to operating and/or societal costs, whereas policy-makers considering external costs, such as those resulting from environmental impacts, may reach significantly different conclusions about which technologies are most advantageous to society. This paper summarizes a TLCC model which was developed to facilitate consideration of the various factors involved in both individual and societal policy decision making. The model was developed as part of a US Department of Energy Contract and has been revised to reflect changes necessary to make the model more realistic. The model considers capital, operating, salvage, and environmental costs for cars, vans, and buses using conventional and alternative fuels. The model has been developed to operate on an IBM or compatible personal computer platform using the commercial spreadsheet program MicroSoft Excell reg-sign Version 4 for Windows reg-sign and can be easily kept current because its modular structure allows straightforward access to embedded data sets for review and update

  13. Environmental Impacts, Health and Safety Impacts, and Financial Costs of the Front End of the Nuclear Fuel Cycle

    Energy Technology Data Exchange (ETDEWEB)

    Brett W Carlsen; Urairisa Phathanapirom; Eric Schneider; John S. Collins; Roderick G. Eggert; Brett Jordan; Bethany L. Smith; Timothy M. Ault; Alan G. Croff; Steven L. Krahn; William G. Halsey; Mark Sutton; Clay E. Easterly; Ryan P. Manger; C. Wilson McGinn; Stephen E. Fisher; Brent W. Dixon; Latif Yacout

    2013-07-01

    FEFC processes, unlike many of the proposed fuel cycles and technologies under consideration, involve mature operational processes presently in use at a number of facilities worldwide. This report identifies significant impacts resulting from these current FEFC processes and activities. Impacts considered to be significant are those that may be helpful in differentiating between fuel cycle performance and for which the FEFC impact is not negligible relative to those from the remainder of the full fuel cycle. This report: • Defines ‘representative’ processes that typify impacts associated with each step of the FEFC, • Establishes a framework and architecture for rolling up impacts into normalized measures that can be scaled to quantify their contribution to the total impacts associated with various fuel cycles, and • Develops and documents the bases for estimates of the impacts and costs associated with each of the representative FEFC processes.

  14. Modified natural cycle versus controlled ovarian hyperstimulation IVF: a cost-effectiveness evaluation of three simulated treatment scenarios.

    Science.gov (United States)

    Groen, Henk; Tonch, Nino; Simons, Arnold H M; van der Veen, Fulco; Hoek, Annemieke; Land, Jolande A

    2013-12-01

    Can modified natural cycle IVF or ICSI (MNC) be a cost-effective alternative for controlled ovarian hyperstimulation IVF or ICSI (COH)? The comparison of simulated scenarios indicates that a strategy of three to six cycles of MNC with minimized medication is a cost-effective alternative for one cycle of COH with strict application of single embryo transfer (SET). MNC is cheaper per cycle than COH but also less effective in terms of live birth rate (LBR). However, strict application of SET in COH cycles reduces effectiveness and up to three MNC cycles can be performed at the same costs as one COH cycle. The cost-effectiveness of MNC versus COH was evaluated in three simulated treatment scenarios: three cycles of MNC versus one cycle of COH with SET or double embryo transfer (DET) and subsequent transfer of cryopreserved embryos (Scenario 1); six cycles of MNC versus one cycle of COH with strictly SET and subsequent transfer of cryopreserved embryos (Scenario 2); six cycles of MNC with minimized medication (hCG ovulation trigger only) versus one cycle of COH with SET or DET and subsequent transfer of cryopreserved embryos (Scenario 3). We used baseline data obtained from two retrospective cohorts of consecutive patients (2005-2008) undergoing MNC in the University Medical Center Groningen (n = 499, maximum six cycles per patient) or their first COH cycle with subsequent transfer of cryopreserved embryos in the Academic Medical Center Amsterdam (n = 392). Data from 1994 MNC cycles (958 MNC-IVF and 1036 MNC-ICSI) and 392 fresh COH cycles (one per patient, 196 COH-IVF and 196 COH-ICSI) with subsequent transfer of cryopreserved embryos (n = 72 and n = 94 in MNC and COH cycles, respectively) in ovulatory, subfertile women cost-effectiveness ratio (ICER) was calculated, defined as the ratio of the difference in IVF costs up to 6 weeks postpartum to the difference in LBR. Live birth was the primary outcome measure and was defined as the birth of at least one living child

  15. Waste management facilities cost information for hazardous waste. Revision 1

    International Nuclear Information System (INIS)

    Shropshire, D.; Sherick, M.; Biagi, C.

    1995-06-01

    This report contains preconceptual designs and planning level life-cycle cost estimates for managing hazardous waste. The report's information on treatment, storage, and disposal modules can be integrated to develop total life-cycle costs for various waste management options. A procedure to guide the US Department of Energy and its contractor personnel in the use of cost estimation data is also summarized in this report

  16. Estimating remediation costs for the Montclair radium superfund sites

    International Nuclear Information System (INIS)

    Turner, M.J.

    1995-01-01

    The Montclair/West Orange and Glen Ridge Superfund Sites, located in Essex County, NJ, are contaminated to varying degrees with radioactive materials. The waste originated from radium processing facilities prevalent in the area during the early 1900s. The design for remediation of these sites is managed by Bechtel National, Inc. on behalf of the United States Army Corps of Engineers, Kansas City District, which administers the project through an interagency agreement with the US Environmental Protection Agency (EPA). Design efforts for the project began in 1990. A portion of the scope, which is the topic of this article, was preparing the remediation costs estimates. These estimates were to be prepared from the detailed design packages; the Corps of Engineers required that the estimates were prepared using the Micro Computer-Aided Cost Estimating System (MCACES). This article discusses the design methods used, provides an overview of MCACES, and discusses the structure and preparation of the cost estimate and its uses. However, the main focus of the article is the methods used to generate the required project-specific cost estimate format for this project. 6 figs

  17. Venture Guidance Appraisal cost estimates for groundwater protection Environmental Impact Statement

    International Nuclear Information System (INIS)

    Moyer, R.A.

    1987-01-01

    Cost estimates were prepared for closure options at criteria waste sites and alternatives for new disposal facilities for hazardous wastes, mixed wastes, low level radioactive wastes and slurry from liquid waste treatment facilities. Because these cost estimates will be used in the Groundwater Protection EIS, the goal was to develop ''enveloping'' costs, i.e., the alternative or option chosen for execution at a later date should cost no more than the estimate. This report summarizes scenarios for making detailed cost estimates. Also included are unit costs for disposition of potential excavations, for operational activities, and for groundwater monitoring and site maintenance after closure of the site. The cost numbers presented are intended for study purposes only and not for budgetary activities

  18. MONITOR: A computer model for estimating the costs of an integral monitored retrievable storage facility

    International Nuclear Information System (INIS)

    Reimus, P.W.; Sevigny, N.L.; Schutz, M.E.; Heller, R.A.

    1986-12-01

    The MONITOR model is a FORTRAN 77 based computer code that provides parametric life-cycle cost estimates for a monitored retrievable storage (MRS) facility. MONITOR is very flexible in that it can estimate the costs of an MRS facility operating under almost any conceivable nuclear waste logistics scenario. The model can also accommodate input data of varying degrees of complexity and detail (ranging from very simple to more complex) which makes it ideal for use in the MRS program, where new designs and new cost data are frequently offered for consideration. MONITOR can be run as an independent program, or it can be interfaced with the Waste System Transportation and Economic Simulation (WASTES) model, a program that simulates the movement of waste through a complete nuclear waste disposal system. The WASTES model drives the MONITOR model by providing it with the annual quantities of waste that are received, stored, and shipped at the MRS facility. Three runs of MONITOR are documented in this report. Two of the runs are for Version 1 of the MONITOR code. A simulation which uses the costs developed by the Ralph M. Parsons Company in the 2A (backup) version of the MRS cost estimate. In one of these runs MONITOR was run as an independent model, and in the other run MONITOR was run using an input file generated by the WASTES model. The two runs correspond to identical cases, and the fact that they gave identical results verified that the code performed the same calculations in both modes of operation. The third run was made for Version 2 of the MONITOR code. A simulation which uses the costs developed by the Ralph M. Parsons Company in the 2B (integral) version of the MRS cost estimate. This run was made with MONITOR being run as an independent model. The results of several cases have been verified by hand calculations

  19. Cost estimate of bovine tuberculosis to Ethiopia.

    Science.gov (United States)

    Tschopp, Rea; Hattendorf, Jan; Roth, Felix; Choudhury, Adnan Ali Khan; Choudhoury, Adnan; Shaw, Alexandra; Aseffa, Abraham; Zinsstag, Jakob

    2013-01-01

    While bovine tuberculosis (BTB) has been eliminated in some industrialized countries, it prevails worldwide, particularly in Africa. In Ethiopia, BTB is prevalent as numerous studies have shown its occurrence in livestock and in abattoirs but it has not been demonstrated in wildlife and only very few cases have been found in humans. The objective of this study is to estimate the cost of BTB to Ethiopia with the aim of informing Ethiopian policy on options for BTB control. BTB in livestock affects both animal productivity and herd demographic composition. The Livestock Development Planning System (LDPS2, FAO) was modified to allow for stochastic simulation of parameters. We performed an incremental cost of disease analysis, comparing livestock production with and without BTB. For the rural scenario we considered an endemically stable 4 % comparative intradermal test (CIDT) prevalence and for the urban scenario an endemically stable 32 % CIDT prevalence among cattle. The net present value of rural Ethiopian livestock products in 2005 is estimated at 65.7 billion (thousand million) Ethiopian Birr (95 % Confidence Interval (CI) 53.8-77.7 billion Birr), which is the equivalent of 7.5 billion US$ (95 %CI 6.1-8.9 billion US$) at a rate of 8.7 Birr per US$ in 2005. The cost of BTB ranges from 646 million Birr (75.2 million US$) in 2005 to 3.1 Billion Birr in 2011 (358 million US$) but is within the range of uncertainty of our estimate and can thus not be distinguished from zero. The cost of disease in the urban livestock production ranges from 5 to 42 million Birr (500,000-4.9 million US$) between 2005 and 2011 but is also within the range of uncertainty of our estimate. Our study shows no measurable loss in asset value or cost of disease due to BTB in rural and urban production systems in Ethiopia. This does not mean that there is not a real cost of disease, but the variability of the productivity parameters and prices are high and would require more precise estimates

  20. An improved COCOMO software cost estimation model | Duke ...

    African Journals Online (AJOL)

    In this paper, we discuss the methodologies adopted previously in software cost estimation using the COnstructive COst MOdels (COCOMOs). From our analysis, COCOMOs produce very high software development efforts, which eventually produce high software development costs. Consequently, we propose its extension, ...

  1. Failing to Estimate the Costs of Offshoring

    DEFF Research Database (Denmark)

    Møller Larsen, Marcus

    2016-01-01

    This article investigates cost estimation errors in the context of offshoring. It is argued that an imprecise estimation of the costs related to implementing a firm activity in a foreign location has a negative impact on the process performance of that activity. Performance is deterred...... as operations are likely to be disrupted by managerial distraction and resource misallocation. It is also argued that this relationship is mitigated by the extent to which firms use modularity to coordinate the activity but worsened by the extent to which ongoing communication is used. The results, based...

  2. The role of interest and inflation rates in life-cycle cost analysis

    Science.gov (United States)

    Eisenberger, I.; Remer, D. S.; Lorden, G.

    1978-01-01

    The effect of projected interest and inflation rates on life cycle cost calculations is discussed and a method is proposed for making such calculations which replaces these rates by a single parameter. Besides simplifying the analysis, the method clarifies the roles of these rates. An analysis of historical interest and inflation rates from 1950 to 1976 shows that the proposed method can be expected to yield very good projections of life cycle cost even if the rates themselves fluctuate considerably.

  3. Reducing Inventory System Costs by Using Robust Demand Estimators

    OpenAIRE

    Raymond A. Jacobs; Harvey M. Wagner

    1989-01-01

    Applications of inventory theory typically use historical data to estimate demand distribution parameters. Imprecise knowledge of the demand distribution adds to the usual replenishment costs associated with stochastic demands. Only limited research has been directed at the problem of choosing cost effective statistical procedures for estimating these parameters. Available theoretical findings on estimating the demand parameters for (s, S) inventory replenishment policies are limited by their...

  4. Role of lignin in reducing life-cycle carbon emissions, water use, and cost for United States cellulosic biofuels.

    Science.gov (United States)

    Scown, Corinne D; Gokhale, Amit A; Willems, Paul A; Horvath, Arpad; McKone, Thomas E

    2014-01-01

    Cellulosic ethanol can achieve estimated greenhouse gas (GHG) emission reductions greater than 80% relative to gasoline, largely as a result of the combustion of lignin for process heat and electricity in biorefineries. Most studies assume lignin is combusted onsite, but exporting lignin to be cofired at coal power plants has the potential to substantially reduce biorefinery capital costs. We assess the life-cycle GHG emissions, water use, and capital costs associated with four representative biorefinery test cases. Each case is evaluated in the context of a U.S. national scenario in which corn stover, wheat straw, and Miscanthus are converted to 1.4 EJ (60 billion liters) of ethanol annually. Life-cycle GHG emissions range from 4.7 to 61 g CO2e/MJ of ethanol (compared with ∼ 95 g CO2e/MJ of gasoline), depending on biorefinery configurations and marginal electricity sources. Exporting lignin can achieve GHG emission reductions comparable to onsite combustion in some cases, reduce life-cycle water consumption by up to 40%, and reduce combined heat and power-related capital costs by up to 63%. However, nearly 50% of current U.S. coal-fired power generating capacity is expected to be retired by 2050, which will limit the capacity for lignin cofiring and may double transportation distances between biorefineries and coal power plants.

  5. The unit cost factors and calculation methods for decommissioning - Cost estimation of nuclear research facilities

    International Nuclear Information System (INIS)

    Kwan-Seong Jeong; Dong-Gyu Lee; Chong-Hun Jung; Kune-Woo Lee

    2007-01-01

    Available in abstract form only. Full text of publication follows: The uncertainties of decommissioning costs increase high due to several conditions. Decommissioning cost estimation depends on the complexity of nuclear installations, its site-specific physical and radiological inventories. Therefore, the decommissioning costs of nuclear research facilities must be estimated in accordance with the detailed sub-tasks and resources by the tasks of decommissioning activities. By selecting the classified activities and resources, costs are calculated by the items and then the total costs of all decommissioning activities are reshuffled to match with its usage and objectives. And the decommissioning cost of nuclear research facilities is calculated by applying a unit cost factor method on which classification of decommissioning works fitted with the features and specifications of decommissioning objects and establishment of composition factors are based. Decommissioning costs of nuclear research facilities are composed of labor cost, equipment and materials cost. Of these three categorical costs, the calculation of labor costs are very important because decommissioning activities mainly depend on labor force. Labor costs in decommissioning activities are calculated on the basis of working time consumed in decommissioning objects and works. The working times are figured out of unit cost factors and work difficulty factors. Finally, labor costs are figured out by using these factors as parameters of calculation. The accuracy of decommissioning cost estimation results is much higher compared to the real decommissioning works. (authors)

  6. Life cycle costs for disposal and assured isolation of low-level radioactive waste in Connecticut

    International Nuclear Information System (INIS)

    Chau, B.; Sutherland, A.A.; Baird, R.D.

    1998-03-01

    This document presents life cycle costs for a low-level radioactive disposal facility and a comparable assured isolation facility. Cost projections were based on general plans and assumptions, including volume projections and operating life, provided by the Connecticut Hazardous Waste Management Service, for a facility designed to meet the State's needs. Life cycle costs include the costs of pre-construction activities, construction, operations, closure, and post-closure institutional control. In order to provide a better basis for understanding the relative magnitude of near-term costs and future costs, the results of present value analysis of ut-year costs are provided

  7. [Methodologies for estimating the indirect costs of traffic accidents].

    Science.gov (United States)

    Carozzi, Soledad; Elorza, María Eugenia; Moscoso, Nebel Silvana; Ripari, Nadia Vanina

    2017-01-01

    Traffic accidents generate multiple costs to society, including those associated with the loss of productivity. However, there is no consensus about the most appropriate methodology for estimating those costs. The aim of this study was to review methods for estimating indirect costs applied in crash cost studies. A thematic review of the literature was carried out between 1995 and 2012 in PubMed with the terms cost of illness, indirect cost, road traffic injuries, productivity loss. For the assessment of costs we used the the human capital method, on the basis of the wage-income lost during the time of treatment and recovery of patients and caregivers. In the case of premature death or total disability, the discount rate was applied to obtain the present value of lost future earnings. The computed years arose by subtracting to life expectancy at birth the average age of those affected who are not incorporated into the economically active life. The interest in minimizing the problem is reflected in the evolution of the implemented methodologies. We expect that this review is useful to estimate efficiently the real indirect costs of traffic accidents.

  8. AES, Automated Construction Cost Estimation System

    International Nuclear Information System (INIS)

    Holder, D.A.

    1995-01-01

    A - Description of program or function: AES (Automated Estimating System) enters and updates the detailed cost, schedule, contingency, and escalation information contained in a typical construction or other project cost estimates. It combines this information to calculate both un-escalated and escalated and cash flow values for the project. These costs can be reported at varying levels of detail. AES differs from previous versions in at least the following ways: The schedule is entered at the WBS-Participant, Activity level - multiple activities can be assigned to each WBS-Participant combination; the spending curve is defined at the schedule activity level and a weighing factor is defined which determines percentage of cost for the WBS-Participant applied to the schedule activity; Schedule by days instead of Fiscal Year/Quarter; Sales Tax is applied at the Line Item Level- a sales tax codes is selected to indicate Material, Large Single Item, or Professional Services; a 'data filter' has been added to allow user to define data the report is to be generated for. B - Method of solution: Average Escalation Rate: The average escalation for a Bill of is calculated in three steps. 1. A table of quarterly escalation factors is calculated based on the base fiscal year and quarter of the project entered in the estimate record and the annual escalation rates entered in the Standard Value File. 2. The percentage distribution of costs by quarter for the Bill of Material is calculated based on the schedule entered and the curve type. 3. The percent in each fiscal year and quarter in the distribution is multiplied by the escalation factor for the fiscal year and quarter. The sum of these results is the average escalation rate for that Bill of Material. Schedule by curve: The allocation of costs to specific time periods is dependent on three inputs, starting schedule date, ending schedule date, and the percentage of costs allocated to each quarter. Contingency Analysis: The

  9. A life cycle cost economics model for automation projects with uniformly varying operating costs. [applied to Deep Space Network and Air Force Systems Command

    Science.gov (United States)

    Remer, D. S.

    1977-01-01

    The described mathematical model calculates life-cycle costs for projects with operating costs increasing or decreasing linearly with time. The cost factors involved in the life-cycle cost are considered, and the errors resulting from the assumption of constant rather than uniformly varying operating costs are examined. Parameters in the study range from 2 to 30 years, for project life; 0 to 15% per year, for interest rate; and 5 to 90% of the initial operating cost, for the operating cost gradient. A numerical example is presented.

  10. Structural Estimation of Stock Market Participation Costs

    DEFF Research Database (Denmark)

    Khorunzhina, Natalia

    2013-01-01

    education programs can affect consumers' investment decisions. Using household data from the Panel Study of Income Dynamics, I estimate the magnitude of the participation cost, allowing for individual heterogeneity in it. The results show the average stock market participation cost is about 4–6% of labor...

  11. Cost estimation: An expert-opinion approach. [cost analysis of research projects using the Delphi method (forecasting)

    Science.gov (United States)

    Buffalano, C.; Fogleman, S.; Gielecki, M.

    1976-01-01

    A methodology is outlined which can be used to estimate the costs of research and development projects. The approach uses the Delphi technique a method developed by the Rand Corporation for systematically eliciting and evaluating group judgments in an objective manner. The use of the Delphi allows for the integration of expert opinion into the cost-estimating process in a consistent and rigorous fashion. This approach can also signal potential cost-problem areas. This result can be a useful tool in planning additional cost analysis or in estimating contingency funds. A Monte Carlo approach is also examined.

  12. Preliminary ITER cost and schedule estimates

    International Nuclear Information System (INIS)

    1990-01-01

    The cost, manpower requirements, and schedule estimates for the realization of the ITER tokamak have been studied during the Conceptual Design Activities, as a result of work by the ITER Management Committee. This work was completed during the January-March, 1990 joint work session, and is presented in this report. A possible schedule shows completion of the engineering design phase in 1995, with 180 professionals, at a cost of about $250M. The construction would be completed in 2004 with a rise in professional staff to 300, and a total cost of $4900M. The machine would be operable over an 18-year period, at an annual operating cost averaging $290M. 2 figs

  13. Cost analysis guidelines

    International Nuclear Information System (INIS)

    Strait, R.S.

    1996-01-01

    The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy's (DOE's) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies

  14. Life Cycle Cost Evaluation of Noise and Vibration Control Methods at Urban Railway Turnouts

    Directory of Open Access Journals (Sweden)

    Rodrigo Tavares de Freitas

    2016-12-01

    Full Text Available A focus of the railway industry over the past decades has been to research, find and develop methods to mitigate noise and vibration resulting from wheel/rail contact along track infrastructure. This resulted in a wide range of abatement measures that are available for today’s engineers. The suitability of each method must be analysed through budget and timeframe limitations, which includes building, maintenance and inspection costs and time allocation, while also aiming at delivering other benefits, such as environmental impact and durability of infrastructure. There are several situations that need noise and vibration mitigation methods, but each design allocates different priorities on a case-by-case basis. Traditionally, the disturbance caused by railways to the community are generated by wheel/rail contact sound radiation that is expressed in different ways, depending on the movement of the rolling stock and track alignment, such as rolling noise, impact noise and curve noise. More specifically, in special trackworks such as turnouts (or called “switches and crossings”, there are two types of noise that can often be observed: impact noise and screeching noise. With respect to the screeching (or flanging, its mitigation methods are usually associated with curve lubrications. In contrast, the impact noise emerges from the sound made by the rolling stock moving through joints and discontinuities (i.e., gaps, resulting in various noise abatement features to minimise such noise impact. Life cycle analysis is therefore vital for cost efficiency benchmarking of the mitigation methods. The evaluation is based on available data from open literature and the total costs were estimated from valid industry reports to maintain coherency. A 50-year period for a life cycle analysis is chosen for this study. As for the general parameters, an area with a high density of people is considered to estimate the values for a community with very strict limits

  15. Estimation of the externalities associated with atmospheric emissions of the electric power production cycle

    International Nuclear Information System (INIS)

    Jacomino, Vanusa Maria Feliciano; Barreto, Alberto Avelar; Pereira, Maria Cristina; Branco, Otavio Eurico de Aquino; Aronne, Ivan Dionysio; Pinheiro, Ricardo Brant

    2000-01-01

    Nowadays the activities connected to energy generation and distribution are those that most contribute to local, regional and global degradation of the environment. One of the most important contribution for externalities estimation is the ExternE Project, which has established a methodological framework called damage function approach to quantify both health and environmental impacts from electricity generation as well as to quantify in monetary terms the damage resulting from these physical impacts. In order to incorporate economic, social and environmental aspects in the decision process of energy planning in Brazil, a joint research project sponsored by the International Atomic Energy Agency is being carried out. The primary objective of this Project is to perform a comparative assessment of external costs of alternative fuel cycles for electricity production. It includes not only the quantification of the physical impacts and damage costs associated with airborne emissions from the traditional fossil fuels (coal, gas and oil) and nuclear energy, but also those from renewable resources, most specifically from hydroelectric. The main objective of this paper is to present preliminary results of the external costs associated to atmospheric emissions of an oil fired plant. Applying the Damage Function Approach methodology the quantification of healthy impacts and damage cost was performed. These results will later be compared with those from nuclear energy option. Atmospheric dispersion studies were carried out using the Industrial Complex Source Model. The healthy impacts were estimated using the exposure-response curves recommended by the ExternE Project. The monetary unit cost for different public health endpoints considered in this study were obtained indirectly by using unit cost values taken from Contingent Valuation studies sponsored by the World Bank, which are specific for developing countries. (author)

  16. Life cycle costs for the optimized production of hydrogen and biogas from microalgae

    International Nuclear Information System (INIS)

    Meyer, Markus A.; Weiss, Annika

    2014-01-01

    Despite the known advantages of microalgae compared with other biomass providers or fossil fuels, microalgae are predominately produced for high-value products. Economic constraints might limit the commercial energetic use of microalgae. Therefore, we identify the LCCs (life cycle costs) and economic hot spots for photoautotrophic hydrogen generation from photoautotrophically grown Chlamydomonas reinhardtii in a novel staggered PBR (photobioreactor) and the anaerobic digestion of the residual biomass to obtain biogas. The novel PBR aims at minimizing energy consumption for mixing and aeration and at optimizing the light conditions for algal growth. The LCCs per MJ amounted to 12.17 Euro for hydrogen and 0.99 Euro for biogas in 2011 for Germany. Market prices per MJ of 0.02 Euro for biogas and 0.04 Euro for hydrogen are considerably exceeded. Major contributors to operating costs, about 70% of total LCCs, are personnel and overhead costs. The investment costs consist to about 92% of those for the PBR with a share of 61% membrane costs. The choice of Madrid as another production location with higher incident solar irradiation and lower personnel costs reduces LCCs by about 40%. Projecting LCCs to 2030 with experience curves, the LCCs still exceed future market prices. - Highlights: • Life cycle cost assessment of hydrogen and biogas from microalgae in a novel photobioreactor. • Current and future (2030) economically viable production unlikely in Germany. • Personnel and photobioreactor costs are major cost drivers. • Changing the production location may significantly reduce the life cycle costs

  17. Analysis of the total system life cycle cost for the Civilian Radioactive Waste Management Program: executive summary

    International Nuclear Information System (INIS)

    1985-04-01

    The total-system life-cycle cost (TSLCC) analysis for the Department of Energy's Civilian Radioactive Waste Management Progrram is an ongoing activity that helps determine whether the revenue-producing mechanism established by the Nuclear Waste Policy Act of 1982 is sufficient to cover the cost of the program. This report is an input into the third evaluation of the adequacy of the fee. The total-system cost for the reference waste-management program in this analysis is estimated to be 24 to 30 billion (1984) dollars. For the sensitivity cases studied in this report, the costs could be as high as 35 billion dollars and as low as 21 billion dollars. Because factors like repository location, the quantity of waste generated, transportation-cask technology, and repository startup dates exert substantial impacts on total-system costs, there are several tradeoffs between these factors, and these tradeoffs can greatly influence the total cost of the program. The total-system cost for the reference program described in this report is higher by 3 to 5 billion dollars, or 15 to 20%, than the cost for the reference program of the TSLCC analysis of April 1984. More than two-thirds of this increase is in the cost of repository construction and operation. These repository costs have increased because of changing design concepts, different assumptions about the effort required to perform the necessary activities, and a change in the source data on which the earlier analysis was based. Development and evaluation costs have similarly increased because of a net addition to the work content. Transportation costs have increased because of different assumptions about repository locations and several characteristics of the transportation system. It is expected that the estimates of total-system costs will continue to change in response to both an evolving program strategy and better definition of the work required to achieve the program objectives

  18. Costing support and cost control in manufacturing. A cost estimation tool applied in the sheet metal domain.

    NARCIS (Netherlands)

    ten Brinke, E.

    2002-01-01

    In the product development cycle several engineering tasks like design, process planning and production planning have to be executed. The execution of these tasks mainly involves information processing and decision-making. Because costs is an important factor in manufacturing, adequate information

  19. Fuzzy Activity Based Life Cycle Costing For Repairable Equipment

    Directory of Open Access Journals (Sweden)

    Mulubrhan Freselam

    2016-01-01

    Full Text Available Life-cycle cost (LCC is the much known method used for decision making that considers all costs in the life of a system or equipment. Predicting LCCs is fraught with potential errors, owing to the uncertainty in future events, future costs, interest rates, and even hidden costs. These uncertainties have a direct impact on the decision making. Activity based LCC is used to identify the activities and cost drivers in acquisition, operation and maintenance phase. This activity based LCC is integrated with fuzzy set theory and interval mathematics to model these uncertainties. Day–Stout–Warren (DSW algorithm and the vertex method are then used to evaluate competing alternatives. A case of two pumps (Pump A and Pump B are taken and their LCC is analysed using the developed model. The equivalent annual cost of Pump B is greater than Pump A, which leads the decision maker to choose Pump A over Pump B.

  20. Molten Salt: Concept Definition and Capital Cost Estimate

    Energy Technology Data Exchange (ETDEWEB)

    Stoddard, Larry [Black & Veatch, Kansas City, MO (United States); Andrew, Daniel [Black & Veatch, Kansas City, MO (United States); Adams, Shannon [Black & Veatch, Kansas City, MO (United States); Galluzzo, Geoff [Black & Veatch, Kansas City, MO (United States)

    2016-06-30

    The Department of Energy’s (DOE’s) Office of Renewable Power (ORP) has been tasked to provide effective program management and strategic direction for all of the DOE’s Energy Efficiency & Renewable Energy’s (EERE’s) renewable power programs. The ORP’s efforts to accomplish this mission are aligned with national energy policies, DOE strategic planning, EERE’s strategic planning, Congressional appropriation, and stakeholder advice. ORP is supported by three renewable energy offices, of which one is the Solar Energy Technology Office (SETO) whose SunShot Initiative has a mission to accelerate research, development and large scale deployment of solar technologies in the United States. SETO has a goal of reducing the cost of Concentrating Solar Power (CSP) by 75 percent of 2010 costs by 2020 to reach parity with base-load energy rates, and to reduce costs 30 percent further by 2030. The SunShot Initiative is promoting the implementation of high temperature CSP with thermal energy storage allowing generation during high demand hours. The SunShot Initiative has funded significant research and development work on component testing, with attention to high temperature molten salts, heliostats, receiver designs, and high efficiency high temperature supercritical CO2 (sCO2) cycles. DOE retained Black & Veatch to support SETO’s SunShot Initiative for CSP solar power tower technology in the following areas: 1. Concept definition, including costs and schedule, of a flexible test facility to be used to test and prove components in part to support financing. 2. Concept definition, including costs and schedule, of an integrated high temperature molten salt (MS) facility with thermal energy storage and with a supercritical CO2 cycle generating approximately 10MWe. 3. Concept definition, including costs and schedule, of an integrated high temperature falling particle facility with thermal energy storage and with a supercritical CO2

  1. Trajectory-Based Operations (TBO) Cost Estimation, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — The Innovation Laboratory, Inc., proposes to build a tool to estimate airline costs under TBO. This tool includes a cost model that explicitly reasons about traffic...

  2. Life-Cycle Costing of Food Waste Management in Denmark: Importance of Indirect Effects.

    Science.gov (United States)

    Martinez-Sanchez, Veronica; Tonini, Davide; Møller, Flemming; Astrup, Thomas Fruergaard

    2016-04-19

    Prevention has been suggested as the preferred food waste management solution compared to alternatives such as conversion to animal fodder or to energy. In this study we used societal life-cycle costing, as a welfare economic assessment, and environmental life-cycle costing, as a financial assessment combined with life-cycle assessment, to evaluate food waste management. Both life-cycle costing assessments included direct and indirect effects. The latter are related to income effects, accounting for the marginal consumption induced when alternative scenarios lead to different household expenses, and the land-use-changes effect, associated with food production. The results highlighted that prevention, while providing the highest welfare gains as more services/goods could be consumed with the same income, could also incur the highest environmental impacts if the monetary savings from unpurchased food commodities were spent on goods/services with a more environmentally damaging production than that of the (prevented) food. This was not the case when savings were used, e.g., for health care, education, and insurances. This study demonstrates that income effects, although uncertain, should be included whenever alternative scenarios incur different financial costs. Furthermore, it highlights that food prevention measures should not only demote the purchase of unconsumed food but also promote a low-impact use of the savings generated.

  3. The social cost of fuel cycles. Report to the UK Department of Trade and Industry (Department of Industry)

    Energy Technology Data Exchange (ETDEWEB)

    Pearce, D; Bann, C; Georgiou, S

    1992-09-01

    CSERGE was commissioned by the then UK Department of Energy to survey the available literature on the monetary estimation of the social costs of energy production and use. It focuses on the social costs of electricity production. The report assesses 'externality adders' defined as a surcharge that may be added to the marginal private cost of electricity in order to reflect the non-market damages or benefits that given electricity-generating technology creates. These 'adders' arise from environmental damages, such as the production of greenhouse gases, and from non-environmental externalities such as subsidies. Fuel cycles considered are: coal fired systems, both with and without emission control, oil-fired systems without FGD and low NO[sub x] burners; combined cycle gas turbines; nuclear energy (PWR), wind energy, landfill gas, geothermal energy, tidal power, hydroelectric power, wave energy, solar energy and combined heat and power. Types of adder considered fall into categories including: air pollution, building damage; catastrophic risks/discount rates; crop damage; energy and environment valuation; forest damage; principles of monetary valuation; global damage; health effects; land damage; noise pollution; non-environmental externalities; radiation damage; transmission; visibility; water pollution and biological diversity. 500 refs.

  4. Cost-benefit analysis of sustainable energy development using life-cycle co-benefits assessment and the system dynamics approach

    International Nuclear Information System (INIS)

    Shih, Yi-Hsuan; Tseng, Chao-Heng

    2014-01-01

    Highlights: • The energy policy was assessed using the system dynamics approach. • A life table approach was presented to estimate averted loss of life expectancy. • The mortality benefits estimated by VSL and VSLY are found to be similar. • Economic feasibility of the energy policy for climate change mitigation was presented. - Abstract: A novel Air Resource Co-benefits model was developed to estimate the social benefits of a Sustainable Energy Policy, involving both renewable energy (RE) and energy efficiency improvements (EEI). The costs and benefits of the policy during 2010–2030 were quantified. A system dynamics model was constructed to simulate the amount of energy saving under the scenario of promoting both RE and EEI. The life-cycle co-reductions of five criteria pollutants (PM 10 , SO 2 , NOx, CO, and ozone) and greenhouse gas are estimated by assuming coal fired as marginal electricity suppliers. Moreover, a concise life table approach was developed to estimate averted years of life lost (YOLL). The results showed that YOLL totaling 0.11–0.21 years (41–78 days) per capita, or premature deaths totaling 126,507–251,169, is expected to be averted during 2010–2030 under the RE plus EEI scenario. Specifically, because of the higher investment cost, the benefit-cost ratio of 1.9–2.1 under the EEI scenario is lower than the 7.2–7.9 under the RE scenario. This difference reveals that RE is more socially beneficial than EEI. The net benefit of the RE and EEI scenarios during 2010–2030 totaled approximately US$ 5,972–6,893 per person or US$ 170–190 per MW h. To summarize, this study presents a new approach to estimate averted YOLL, and finds that the health benefits can justify the compliance costs associated with the Sustainable Energy Policy

  5. Time-driven activity-based costing to estimate cost of care at multidisciplinary aerodigestive centers.

    Science.gov (United States)

    Garcia, Jordan A; Mistry, Bipin; Hardy, Stephen; Fracchia, Mary Shannon; Hersh, Cheryl; Wentland, Carissa; Vadakekalam, Joseph; Kaplan, Robert; Hartnick, Christopher J

    2017-09-01

    Providing high-value healthcare to patients is increasingly becoming an objective for providers including those at multidisciplinary aerodigestive centers. Measuring value has two components: 1) identify relevant health outcomes and 2) determine relevant treatment costs. Via their inherent structure, multidisciplinary care units consolidate care for complex patients. However, their potential impact on decreasing healthcare costs is less clear. The goal of this study was to estimate the potential cost savings of treating patients with laryngeal clefts at multidisciplinary aerodigestive centers. Retrospective chart review. Time-driven activity-based costing was used to estimate the cost of care for patients with laryngeal cleft seen between 2008 and 2013 at the Massachusetts Eye and Ear Infirmary Pediatric Aerodigestive Center. Retrospective chart review was performed to identify clinic utilization by patients as well as patient diet outcomes after treatment. Patients were stratified into neurologically complex and neurologically noncomplex groups. The cost of care for patients requiring surgical intervention was five and three times as expensive of the cost of care for patients not requiring surgery for neurologically noncomplex and complex patients, respectively. Following treatment, 50% and 55% of complex and noncomplex patients returned to normal diet, whereas 83% and 87% of patients experienced improved diets, respectively. Additionally, multidisciplinary team-based care for children with laryngeal clefts potentially achieves 20% to 40% cost savings. These findings demonstrate how time-driven activity-based costing can be used to estimate and compare patient costs in multidisciplinary aerodigestive centers. 2c. Laryngoscope, 127:2152-2158, 2017. © 2017 The American Laryngological, Rhinological and Otological Society, Inc.

  6. A new approach for product cost estimation using data envelopment analysis

    Directory of Open Access Journals (Sweden)

    Adil Salam

    2012-10-01

    Full Text Available Cost estimation of new products has always been difficult as only few design, manufacturing and operational features will be known. In these situations, parametric or non-parametric methods are commonly used to estimate the cost of a product given the corresponding cost drivers. The parametric models use priori determined cost function where the parameters of the function are evaluated from historical data. Non-parametric methods, on the other hand, attempt to fit curves to the historic data without predetermined function. In both methods, it is assumed that the historic data used in the analysis is a true representation of the relation between the cost drivers and the corresponding costs. However, because of efficiency variations of the manufacturers and suppliers, changes in supplier selections, market fluctuations, and several other reasons, certain costs in the historic data may be too high whereas other costs may represent better deals for their corresponding cost drivers. Thus, it may be important to rank the historic data and identify benchmarks and estimate the target costs of the product based on these benchmarks. In this paper, a novel adaptation of cost drivers and cost data is introduced in order to use data envelopment analysis for the purpose of ranking cost data and identify benchmarks, and then estimate the target costs of a new product based on these benchmarks. An illustrative case study has been presented for the cost estimation of landing gears of an aircraft manufactured by an aerospace company located in Montreal, CANADA.

  7. Cost analysis of small hydroelectric power plants components and preliminary estimation of global cost

    International Nuclear Information System (INIS)

    Basta, C.; Olive, W.J.; Antunes, J.S.

    1990-01-01

    An analysis of cost for each components of Small Hydroelectric Power Plant, taking into account the real costs of these projects is shown. It also presents a global equation which allows a preliminary estimation of cost for each construction. (author)

  8. Taking the Evolutionary Road to Developing an In-House Cost Estimate

    Science.gov (United States)

    Jacintho, David; Esker, Lind; Herman, Frank; Lavaque, Rodolfo; Regardie, Myma

    2011-01-01

    This slide presentation reviews the process and some of the problems and challenges of developing an In-House Cost Estimate (IHCE). Using as an example the Space Network Ground Segment Sustainment (SGSS) project, the presentation reviews the phases for developing a Cost estimate within the project to estimate government and contractor project costs to support a budget request.

  9. Electric vehicle life cycle cost analysis : final research project report.

    Science.gov (United States)

    2017-02-01

    This project compared total life cycle costs of battery electric vehicles (BEV), plug-in hybrid electric vehicles (PHEV), hybrid electric vehicles (HEV), and vehicles with internal combustion engines (ICE). The analysis considered capital and operati...

  10. Incorporating uncertainty analysis into life cycle estimates of greenhouse gas emissions from biomass production

    International Nuclear Information System (INIS)

    Johnson, David R.; Willis, Henry H.; Curtright, Aimee E.; Samaras, Constantine; Skone, Timothy

    2011-01-01

    Before further investments are made in utilizing biomass as a source of renewable energy, both policy makers and the energy industry need estimates of the net greenhouse gas (GHG) reductions expected from substituting biobased fuels for fossil fuels. Such GHG reductions depend greatly on how the biomass is cultivated, transported, processed, and converted into fuel or electricity. Any policy aiming to reduce GHGs with biomass-based energy must account for uncertainties in emissions at each stage of production, or else it risks yielding marginal reductions, if any, while potentially imposing great costs. This paper provides a framework for incorporating uncertainty analysis specifically into estimates of the life cycle GHG emissions from the production of biomass. We outline the sources of uncertainty, discuss the implications of uncertainty and variability on the limits of life cycle assessment (LCA) models, and provide a guide for practitioners to best practices in modeling these uncertainties. The suite of techniques described herein can be used to improve the understanding and the representation of the uncertainties associated with emissions estimates, thus enabling improved decision making with respect to the use of biomass for energy and fuel production. -- Highlights: → We describe key model, scenario and data uncertainties in LCAs of biobased fuels. → System boundaries and allocation choices should be consistent with study goals. → Scenarios should be designed around policy levers that can be controlled. → We describe a new way to analyze the importance of covariance between inputs.

  11. Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey

    Directory of Open Access Journals (Sweden)

    Abdelrahman Osman Elfaki

    2014-01-01

    Full Text Available Cost estimation is the most important preliminary process in any construction project. Therefore, construction cost estimation has the lion’s share of the research effort in construction management. In this paper, we have analysed and studied proposals for construction cost estimation for the last 10 years. To implement this survey, we have proposed and applied a methodology that consists of two parts. The first part concerns data collection, for which we have chosen special journals as sources for the surveyed proposals. The second part concerns the analysis of the proposals. To analyse each proposal, the following four questions have been set. Which intelligent technique is used? How have data been collected? How are the results validated? And which construction cost estimation factors have been used? From the results of this survey, two main contributions have been produced. The first contribution is the defining of the research gap in this area, which has not been fully covered by previous proposals of construction cost estimation. The second contribution of this survey is the proposal and highlighting of future directions for forthcoming proposals, aimed ultimately at finding the optimal construction cost estimation. Moreover, we consider the second part of our methodology as one of our contributions in this paper. This methodology has been proposed as a standard benchmark for construction cost estimation proposals.

  12. The Acquisition Cost-Estimating Workforce. Census and Characteristics

    Science.gov (United States)

    2009-01-01

    Abbreviations AAC Air Armament Center ACAT acquisition category ACEIT Automated Cost Estimating Integrated Tools AF Air Force AFB Air Force Base AFCAA Air...3 3 4 Automated Cost Estimating Integrated Tools ( ACEIT ) 0 1 12 6 Tecolotea training 0 0 10 5 Other 3 13 24 18 No training 18 4 29 18 Total 100 100...other sources, including AFIT, ACEIT ,9 or the contracting agency that employed them. The remain- ing 29 percent reported having received no training

  13. FASTSim: A Model to Estimate Vehicle Efficiency, Cost and Performance

    Energy Technology Data Exchange (ETDEWEB)

    Brooker, A.; Gonder, J.; Wang, L.; Wood, E.; Lopp, S.; Ramroth, L.

    2015-05-04

    The Future Automotive Systems Technology Simulator (FASTSim) is a high-level advanced vehicle powertrain systems analysis tool supported by the U.S. Department of Energy’s Vehicle Technologies Office. FASTSim provides a quick and simple approach to compare powertrains and estimate the impact of technology improvements on light- and heavy-duty vehicle efficiency, performance, cost, and battery batches of real-world drive cycles. FASTSim’s calculation framework and balance among detail, accuracy, and speed enable it to simulate thousands of driven miles in minutes. The key components and vehicle outputs have been validated by comparing the model outputs to test data for many different vehicles to provide confidence in the results. A graphical user interface makes FASTSim easy and efficient to use. FASTSim is freely available for download from the National Renewable Energy Laboratory’s website (see www.nrel.gov/fastsim).

  14. Analysis of changes in the fuel component of the cost of electricity in the transition to a closed fuel cycle in nuclear power system

    International Nuclear Information System (INIS)

    Gurin, Andrey V.; Alekseev, P.N.

    2017-01-01

    This paper presents a study of scenarios of transition to a closed fuel cycle in the system of nuclear power, built basing on resource availability requirements at the stage of full life-cycle reactors. Conventionally, there are three main scenarios for the development of nuclear energy: with VVER reactors operating in an open fuel cycle; with VVER reactors operating in a closed fuel cycle; and co-operating VVER and BN, operating in a closed fuel cycle. For the considered scenarios, a quantitative estimation of change in time of material balances were performed, including spent fuel balance, balance of plutonium, reprocessed and depleted uranium, radioactive waste, and the analysis of the fuel component of the cost of electricity.

  15. Analysis of changes in the fuel component of the cost of electricity in the transition to a closed fuel cycle in nuclear power system

    Energy Technology Data Exchange (ETDEWEB)

    Gurin, Andrey V. [National Research Centre ' ' Kurchatov Institute' ' , Moscow (Russian Federation); Alekseev, P.N.

    2017-09-15

    This paper presents a study of scenarios of transition to a closed fuel cycle in the system of nuclear power, built basing on resource availability requirements at the stage of full life-cycle reactors. Conventionally, there are three main scenarios for the development of nuclear energy: with VVER reactors operating in an open fuel cycle; with VVER reactors operating in a closed fuel cycle; and co-operating VVER and BN, operating in a closed fuel cycle. For the considered scenarios, a quantitative estimation of change in time of material balances were performed, including spent fuel balance, balance of plutonium, reprocessed and depleted uranium, radioactive waste, and the analysis of the fuel component of the cost of electricity.

  16. Research of the cost-benefit analysis for FR cycle research and development. The annual report of the FY 2001

    International Nuclear Information System (INIS)

    Shiotani, Hiroki; Shinoda, Yoshihiko; Hirao, Kazunori

    2002-07-01

    This report is intended to explain the outline of the research and development (R and D) in the FY 2001 on cost-benefit analysis of FR (Fast Reactor) cycle system concepts. The work was conducted as a part of the JNC's Feasibility Study on Commercialized Fast Reactor Cycle Systems (the F/S)'. In the FY 2001, the work conducted in the JNC was summed up as the followings: Conceptual study on cost-benefit analysis for FR cycle R and D. Refinement on the evaluation procedure and improvement over operation efficiency. Cost-benefit analysis of the reference FR cycle and sensitivity analysis with the revised system. Cost-benefit analyses of R and Ds for various FR cycle candidate concepts including FR cycle concepts studied in the F/S phase 1. The work made it possible to evaluate the cost effectiveness of various FR cycle systems efficiently. The cost-benefit analysis, which is often used for the policy evaluation, is considered to be applicable to FR cycle system concepts in the F/S. (author)

  17. 48 CFR 2452.216-70 - Estimated cost, base fee and award fee.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Estimated cost, base fee... Provisions and Clauses 2452.216-70 Estimated cost, base fee and award fee. As prescribed in 2416.406(e)(1), insert the following clause in all cost-plus-award-fee contracts: Estimated Cost, Base Fee and Award Fee...

  18. Comparison of clinical outcome and costs with CC + gonadotropins and gnrha + gonadotropins during Ivf/ICSI cycles.

    Science.gov (United States)

    Kovacs, Peter; Matyas, Szabolcs; Bernard, l Artur; Kaali, Steven G

    2004-06-01

    To compare clinical outcome and costs of CC + gonadotropins with GnRHa + gonadotropins during IVF/ICSI cycles. Clinical outcome and expenses of 382 CC + gonadotropin and 964 GnRHa + gonadotropin cycles were compared. Medication costs were calculated on the basis of the mean number of ampoules and the proportion of various gonadotropins. Costs per clinical pregnancy were calculated on the basis of expenses and clinical pregnancy rates. Women in the CC + gonadotropin group were younger, and had fewer follicles, oocytes, embryos, and embryos transferred. Clinical pregnancy rates were higher in the GnRHa group (35.9 % vs 26.2%, p costs per cycle were higher in the GnRHa group (US dollars 357 vs 248). Expenses per pregnancy however were lower in the GnRHa group (USdollars 4197 vs 5335 with IVF; USdollars 5590 vs 7244 with ICSI). When different age subgroups with similar baseline characteristics and stimulation parameters were compared, pregnancy rates were significantly higher in the GnRHa groups. Medication cost per cycle was higher in the GnRHa subgroups, and the expense per pregnancy was lower with GnRHa protocol. Cost per cycle is higher with GnRHa + gonadotropin. However, because of the better performance of the GnRHa + gonadotropin stimulation, the cumulative costs are reduced by the time a clinical pregnancy is achieved.

  19. Monitored Retrievable Storage conceptual system studies: closed-cycle vault

    International Nuclear Information System (INIS)

    Washington, J.A.; Ganley, J.T.

    1984-02-01

    The Nuclear Waste Policy Act of 1982 requires the DOE to submit a proposal to Congress by June 1985 for the construction of one or more Monitored Retrieval Storage (MRS) facilities. In response, the DOE initiated studies to develop system descriptions and cost estimates for preconceptual designs of storage concepts suitable for use at MRS facilities. This report provides a system description and cost estimates for a Closed-Cycle Vault (CCV) MRS facility. The facility description is divided into four parts: (1) the R and H area, (2) the interface facility, (3) the on-site transport system, and (4) the storage system. The MRS facility has been designed to meet handling rates of 1800 and 3000 MTU/yr. The corresponding peak inventories are 15,000 and 72,000 MTU. Three types of cases were considered, based on the material to be stored: (1) Spent fuel only; (2) HLW and TRU waste; and (3) HLW only. For each of these three types, a cost estimate was done for a 15,000 and a 72,000 MTU facility, resulting in six different cost estimates. Section 4 presents the cost analysis of the CCV MRS system. Tables 4-2 through 4-7 give the construction or capital costs for the six cases. Tables 4-8 through 4-13 show the total discounted life-cycle costs for each of the six cases. These life-cycle costs include operating and decommissioning costs. These tables also show the time distribution of the capital costs. Table 2-1 summarizes the capital, operating, and discounted costs for the six cases studied. 2 references, 15 figures, 18 tables

  20. Counting the cost: estimating the economic benefit of pedophile treatment programs.

    Science.gov (United States)

    Shanahan, M; Donato, R

    2001-04-01

    The principal objective of this paper is to identify the economic costs and benefits of pedophile treatment programs incorporating both the tangible and intangible cost of sexual abuse to victims. Cost estimates of cognitive behavioral therapy programs in Australian prisons are compared against the tangible and intangible costs to victims of being sexually abused. Estimates are prepared that take into account a number of problematic issues. These include the range of possible recidivism rates for treatment programs; the uncertainty surrounding the number of child sexual molestation offences committed by recidivists; and the methodological problems associated with estimating the intangible costs of sexual abuse on victims. Despite the variation in parameter estimates that impact on the cost-benefit analysis of pedophile treatment programs, it is found that potential range of economic costs from child sexual abuse are substantial and the economic benefits to be derived from appropriate and effective treatment programs are high. Based on a reasonable set of parameter estimates, in-prison, cognitive therapy treatment programs for pedophiles are likely to be of net benefit to society. Despite this, a critical area of future research must include further methodological developments in estimating the quantitative impact of child sexual abuse in the community.

  1. Economics of radioactive material transportation in the light-water reactor nuclear fuel cycle

    International Nuclear Information System (INIS)

    Dupree, S.A.; O'Malley, L.C.

    1980-10-01

    This report presents estimates of certain transportation costs, in 1979 dollars, associated with Light-Water Reactor (LWR) once-through and recycle fuel cycles. Shipment of fuel, high-level waste and low-level waste was considered. Costs were estimated for existing or planned transportation systems and for recommended alternate systems, based on the assumption of mature fuel cycles. The annual radioactive material transportation costs required to support a nominal 1000-MW(e) LWR in a once-through cycle in which spent fuel is shipped to terminal storage or disposal were found to be approx. $490,000. Analogous costs for an average reactor operating in a fuel cycle with uranium and plutonim recycle were determined to be approx. $770,000. These results assume that certain recommended design changes will occur in radioactive material shipping systems as a mature fuel cycle evolves

  2. Development of regional stump-to-mill logging cost estimators

    Science.gov (United States)

    Chris B. LeDoux; John E. Baumgras

    1989-01-01

    Planning logging operations requires estimating the logging costs for the sale or tract being harvested. Decisions need to be made on equipment selection and its application to terrain. In this paper a methodology is described that has been developed and implemented to solve the problem of accurately estimating logging costs by region. The methodology blends field time...

  3. Cost-benefit as weighed on genetic scales

    International Nuclear Information System (INIS)

    Grahn, D.

    1976-01-01

    The genetic cost that may be incurred by exposure to mutagenic agents in the coal and nuclear fuel cycles is assessed, using as a point of departure the presently estimated burden of spontaneously occurring genetic defects in human populations. Risk estimates are necessarily derived from radiation studies, but chemical mutagenic hazards can probably be evaluated relative to the known dose-response relationships of radiation exposure. Cost-benefit analyses for the coal and nuclear fuel cycles are discussed and translated into monetary terms. Coal-associated risks are almost entirely somatic while nuclear risks are somatic and genetic in equal proportions. Dollar costs per man-rem are concluded to be in the $100 range. Pollution abatement costs for the nuclear cycle lie in the range of several hundreds to many thousands of dollars per man-rem reduction. It is considered appropriate to incur such costs, because genetic risks to future generations involve primarily societal and ethical issues rather than economic considerations

  4. A generic tool for cost estimating in aircraft design

    NARCIS (Netherlands)

    Castagne, S.; Curran, R.; Rothwell, A.; Price, M.; Benard, E.; Raghunathan, S.

    2008-01-01

    A methodology to estimate the cost implications of design decisions by integrating cost as a design parameter at an early design stage is presented. The model is developed on a hierarchical basis, the manufacturing cost of aircraft fuselage panels being analysed in this paper. The manufacturing cost

  5. Cost-effectiveness of treatment strategies in women with PCOS who do not conceive after six cycles of clomiphene citrate.

    Science.gov (United States)

    Moolenaar, Lobke M; Nahuis, Marleen J; Hompes, Peter G; van der Veen, Fulco; Mol, Ben Willem J

    2014-05-01

    This study evaluated the cost-effectiveness of treatments for women with polycystic ovary syndrome (PCOS) who ovulate on clomiphene citrate but do not conceive after six cycles. A decision-analytic framework was developed for six scenarios: (1) three cycles of IVF; (2) continuation of clomiphene citrate for six cycles, followed by three cycles of IVF in case of no birth; (3) six cycles of gonadotrophins and three cycles of IVF; (4) 12 cycles of gonadotrophins and three cycles of IVF; (5) continuation of clomiphene citrate for six cycles, six cycles of gonadotrophins and three cycles of IVF; (6) continuation of clomiphene citrate for six cycles, 12 cycles of gonadotrophins and three cycles of IVF. Two-year cumulative birth rates were 58%, 74%, 89%, 97%, 93% and 98% and costs per couple were € 9518, € 7530, € 9711, € 9764, € 7651 and € 7684 for scenarios 1-6, respectively. Scenario 2 was the lowest cost option. The extra cost for at least one live birth in scenario 5 was € 629 and in scenario 6 € 630. In these subjects, continuation of treatment for six cycles of clomiphene citrate, 6 or 12 cycles of gonadotrophins and IVF is potentially cost-effective. These results should be confirmed in a randomized clinical trial. Copyright © 2014 Reproductive Healthcare Ltd. Published by Elsevier Ltd. All rights reserved.

  6. BIM – New rules of measurement ontology for construction cost estimation

    Directory of Open Access Journals (Sweden)

    F.H. Abanda

    2017-04-01

    Full Text Available For generations, the process of cost estimation has been manual, time-consuming and error-prone. Emerging Building Information Modelling (BIM can exploit standard measurement methods to automate cost estimation process and improve inaccuracies. Structuring standard measurement methods in an ontologically and machine readable format for a BIM software can greatly facilitate the process of improving inaccuracies in cost estimation. This study explores the development of an ontology based on New Rules of Measurement (NRM for cost estimation during the tendering stages. The methodology adopted is methontology, one of the most widely used ontology engineering methodologies. To ensure the ontology is fit for purpose, cost estimation experts are employed to check the semantics, descriptive logic-based reasoners are used to syntactically check the ontology and a leading 4D BIM modelling software is used on a case study building to test/validate the proposed ontology.

  7. Thermal and nuclear power generation cost estimates using corporate financial statements

    International Nuclear Information System (INIS)

    Matsuo, Yuhji; Nagatomi, Yu; Murakami, Tomoko

    2012-01-01

    There are two generally accepted methods for estimating power generation costs: so-called 'model plant' method and the method using corporate financial statements. The method using corporate financial statements, though under some constraints, can provide useful information for comparing thermal and nuclear power generation costs. This study used this method for estimating thermal and nuclear power generation costs in Japan for the past five years, finding that the nuclear power generation cost remained stable at around 7 yen per kilowatt-hour (kWh) while the thermal power generation cost moved within a wide range of 9 to 12 yen/kWh in line with wild fluctuations in primary energy prices. The cost of nuclear power generation is expected to increase due to the enhancement of safety measures and accident damage compensation in the future, while there are reactor decommissioning, backend and many other costs that the financial statement-using approach cannot accurately estimate. In the future, efforts should be continued to comprehensively and accurately estimate total costs. (author)

  8. Preliminary Cost Estimates for Nuclear Hydrogen Production: HTSE System

    International Nuclear Information System (INIS)

    Yang, K. J.; Lee, K. Y.; Lee, T. H.

    2008-01-01

    KAERI is now focusing on the research and development of the key technologies required for the design and realization of a nuclear hydrogen production system. As a preliminary study of cost estimates for nuclear hydrogen systems, the hydrogen production costs of the nuclear energy sources benchmarking GTMHR and PBMR are estimated in the necessary input data on a Korean specific basis. G4-ECONS was appropriately modified to calculate the cost for hydrogen production of HTSE (High Temperature Steam Electrolysis) process with VHTR (Very High Temperature nuclear Reactor) as a thermal energy source. The estimated costs presented in this paper show that hydrogen production by the VHTR could be competitive with current techniques of hydrogen production from fossil fuels if CO 2 capture and sequestration is required. Nuclear production of hydrogen would allow large-scale production of hydrogen at economic prices while avoiding the release of CO 2 . Nuclear production of hydrogen could thus become the enabling technology for the hydrogen economy. The major factors that would affect the cost of hydrogen were also discussed

  9. The Cost of Joint Replacement: Comparing Two Approaches to Evaluating Costs of Total Hip and Knee Arthroplasty.

    Science.gov (United States)

    Palsis, John A; Brehmer, Thomas S; Pellegrini, Vincent D; Drew, Jacob M; Sachs, Barton L

    2018-02-21

    In an era of mandatory bundled payments for total joint replacement, accurate analysis of the cost of procedures is essential for orthopaedic surgeons and their institutions to maintain viable practices. The purpose of this study was to compare traditional accounting and time-driven activity-based costing (TDABC) methods for estimating the total costs of total hip and knee arthroplasty care cycles. We calculated the overall costs of elective primary total hip and total knee replacement care cycles at our academic medical center using traditional and TDABC accounting methods. We compared the methods with respect to the overall costs of hip and knee replacement and the costs for each major cost category. The traditional accounting method resulted in higher cost estimates. The total cost per hip replacement was $22,076 (2014 USD) using traditional accounting and was $12,957 using TDABC. The total cost per knee replacement was $29,488 using traditional accounting and was $16,981 using TDABC. With respect to cost categories, estimates using traditional accounting were greater for hip and knee replacement, respectively, by $3,432 and $5,486 for personnel, by $3,398 and $3,664 for space and equipment, and by $2,289 and $3,357 for indirect costs. Implants and consumables were derived from the actual hospital purchase price; accordingly, both methods produced equivalent results. Substantial cost differences exist between accounting methods. The focus of TDABC only on resources used directly by the patient contrasts with the allocation of all operating costs, including all indirect costs and unused capacity, with traditional accounting. We expect that the true costs of hip and knee replacement care cycles are likely somewhere between estimates derived from traditional accounting methods and TDABC. TDABC offers patient-level granular cost information that better serves in the redesign of care pathways and may lead to more strategic resource-allocation decisions to optimize

  10. Fuel cycle cost considerations of increased discharge burnups

    International Nuclear Information System (INIS)

    Scherpereel, L.R.; Frank, F.J.

    1982-01-01

    Evaluations are presented that indicate the attainment of increased discharge burnups in light water reactors will depend on economic factors particular to individual operators. In addition to pure resource conserving effects and assuming continued reliable fuel performance, a substantial economic incentive must exist to justify the longer operating times necessary to achieve higher burnups. Whether such incentive will exist or not will depend on relative price levels of all fuel cycle cost components, utility operating practices, and resolution of uncertainties associated with the back-end of the fuel cycle. It is concluded that implementation of increased burnups will continue at a graduated pace similar to past experience, rather than finding universal acceptance of particular increased levels at any particular time

  11. Waste Management Facilities cost information for mixed low-level waste. Revision 1

    International Nuclear Information System (INIS)

    Shropshire, D.; Sherick, M.; Biadgi, C.

    1995-06-01

    This report contains preconceptual designs and planning level life-cycle cost estimates for managing mixed low-level waste. The report's information on treatment, storage, and disposal modules can be integrated to develop total life-cycle costs for various waste management options. A procedure to guide the US Department of Energy and its contractor personnel in the use of cost estimation data is also summarized in this report

  12. The QUELCE Method: Using Change Drivers to Estimate Program Costs

    Science.gov (United States)

    2016-08-01

    Analysis 4 2.4 Assign Conditional Probabilities 5 2.5 Apply Uncertainty to Cost Formula Inputs for Scenarios 5 2.6 Perform Monte Carlo Simulation to...Distribution Statement A: Approved for Public Release; Distribution is Unlimited 1 Introduction: The Cost Estimation Challenge Because large-scale programs... challenged [Bliss 2012]. Improvements in cost estimation that would make these assumptions more precise and reduce early lifecycle uncertainty can

  13. Cost Estimates for the Decontamination and Decommissioning of Eight ORNL Buildings

    International Nuclear Information System (INIS)

    Hogan, M.

    2006-01-01

    The U.S. Department of Energy's Oak Ridge National Laboratory (ORNL) contains a number of buildings that are antiquated and no longer used. These buildings historically were used for the production of atomic weapons and often remain contaminated with radioactive materials. Certain costs and risks are associated with the long-term stewardship of the buildings. One way to reduce these liabilities is to eliminate the buildings that are no longer in use and are not expected to be used in the future. Some of these buildings at ORNL are located in an area known as 'Isotope Circle'. From this area, eight buildings that are expected to be decontaminated and decommissioned (D and D) in the next five to ten years were chosen to have cost estimates completed. The specific facilities are Buildings 3030, 3031, 3118, 3032, 3033, 3033 Annex, 3034, and 3093. There are many challenges for estimating the costs to D and D buildings potentially contaminated with radionuclides. Each building is unique, has various types and levels of contamination, and (as in this case) often lacks up-to-date information. Because of these limitations, order-of- magnitude cost estimates for each of the eight ORNL buildings were completed using parametric cost modeling software known as RACER TM (Remedial Action Cost Engineering and Requirements System). This type of cost estimate is useful for screening technical concepts and is used for budgetary planning. For the eight buildings evaluated in this study, the total cost to D and D was estimated to be nearly $6 M. This value includes the direct cost of approximately $3.5 M to complete D and D and $2.5 M in cost markups. Also, assuming the actual project does not begin until the year 2010, this total cost is escalated to almost $6.7 M, which accounts for expected inflation. Although the cost estimates in this study were expected to have a wide range in accuracy, there are various factors that could impact these estimates in a negative or positive fashion

  14. Externalities of fuel cycles 'ExternE' project. Coal fuel cycle. Estimation of physical impacts and monetary valuation for priority impact pathways

    International Nuclear Information System (INIS)

    Berry, J.E.; Holland, M.R.; Watkiss, P.R.

    1994-01-01

    agreement on a variety of methodological issues was reached on both sides of the Atlantic. Since 1993 the study has continued in Europe as the ExternE-Project, and now involves an international team of more than 30 organisations. The current study has 4 principal objectives; 1) To design a unified methodology for quantifying the various social costs associated with the production and consumption of energy. 2) To produce a framework to account for the external costs that result from incremental use of different fuels. 3) To use the methodology in an international comparative analysis. 4) To identify critical methodological issues and research requirements. At the same time as the publication of the present report, further reports are being published on the other major fuel cycles for electricity generation, including uranium, lignite, oil, gas, wind and biomass. In addition a further volume, providing greater detail on the methodology used for assessment of the fossil fuel cycles will also be published shortly. This document assesses the progress made in quantifying environmental and health damages associated with the coal fuel cycle. Estimates of impacts have been made following critical review of existing data and models rather than from original basic research. This review has been performed by a multi-disciplinary team including specialists in the fields of health, forestry, ecology, materials science, atmospheric chemistry and physics, energy technology, computer science and economics

  15. Life-Cycle Costs of Alternative ICBM Second Stage Designs

    Science.gov (United States)

    1992-09-01

    of Logistics, Air Force Institute of Technology (AU), Wright-Patterson AFB OH, 1992. 34. Horngren , Charles T. and George Foster. Cost Accounting ; A...Managerial Emphasis (Sixth Edition). Englewood Cliffs NJ: Prentice-Hall, Inc., 1987. 35. Horngren , Charles T. and George Foster. Cost Accounting ; A...our research. We would also like to thank those involved with the 1991 Small ICBM Operations and Support cost estimate. Your assistance with the O& S

  16. Estimating two indirect logging costs caused by accelerated erosion.

    Science.gov (United States)

    Glen O. Klock

    1976-01-01

    In forest areas where high soil erosion potential exists, a comparative yarding cost estimate, including the indirect costs determined by methods proposed here, shows that the total cost of using "advanced" logging methods may be less than that of "traditional" systems.

  17. NATO Initiatives to Improve Life Cycle Costing

    NARCIS (Netherlands)

    Smit, M.C.

    2009-01-01

    There is a long and documented history of both cost growth and estimating optimism within military programmes. This is particularly the case for multi-national programmes. The NATO ALP-10 –Guidance on Integrated Logistics Support for multi-national equipment projects (ILS) dated June 1990 (Reference

  18. A non-stationary cost-benefit based bivariate extreme flood estimation approach

    Science.gov (United States)

    Qi, Wei; Liu, Junguo

    2018-02-01

    Cost-benefit analysis and flood frequency analysis have been integrated into a comprehensive framework to estimate cost effective design values. However, previous cost-benefit based extreme flood estimation is based on stationary assumptions and analyze dependent flood variables separately. A Non-Stationary Cost-Benefit based bivariate design flood estimation (NSCOBE) approach is developed in this study to investigate influence of non-stationarities in both the dependence of flood variables and the marginal distributions on extreme flood estimation. The dependence is modeled utilizing copula functions. Previous design flood selection criteria are not suitable for NSCOBE since they ignore time changing dependence of flood variables. Therefore, a risk calculation approach is proposed based on non-stationarities in both marginal probability distributions and copula functions. A case study with 54-year observed data is utilized to illustrate the application of NSCOBE. Results show NSCOBE can effectively integrate non-stationarities in both copula functions and marginal distributions into cost-benefit based design flood estimation. It is also found that there is a trade-off between maximum probability of exceedance calculated from copula functions and marginal distributions. This study for the first time provides a new approach towards a better understanding of influence of non-stationarities in both copula functions and marginal distributions on extreme flood estimation, and could be beneficial to cost-benefit based non-stationary bivariate design flood estimation across the world.

  19. Methodology used in IRSN nuclear accident cost estimates in France

    International Nuclear Information System (INIS)

    2015-01-01

    This report describes the methodology used by IRSN to estimate the cost of potential nuclear accidents in France. It concerns possible accidents involving pressurized water reactors leading to radioactive releases in the environment. These accidents have been grouped in two accident families called: severe accidents and major accidents. Two model scenarios have been selected to represent each of these families. The report discusses the general methodology of nuclear accident cost estimation. The crucial point is that all cost should be considered: if not, the cost is underestimated which can lead to negative consequences for the value attributed to safety and for crisis preparation. As a result, the overall cost comprises many components: the most well-known is offsite radiological costs, but there are many others. The proposed estimates have thus required using a diversity of methods which are described in this report. Figures are presented at the end of this report. Among other things, they show that purely radiological costs only represent a non-dominant part of foreseeable economic consequences. (authors)

  20. Estimating fuel cycle externalities: Analytical methods and issues. Report number 2 on the external costs and benefits of fuel cycles: A study by the U.S. Department of Energy and the Commission of the European Communities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-07-01

    This report, the second in a series of eight reports, is part of a joint study by the U.S. Department of Energy (DOE) and the Commission of the European Communities (EC) 'on the externalities of fuel cycles.' Part I illustrates the use of the atmospheric dispersion and transformation modeling that this study recommends for airborne pollutants in the coal, biomass, oil, and natural gas fuel cycles. Part II of this volume contains a paper which reviews the scientific literature on ecological impacts associated with power plant discharges. Part III contains papers summarizing the relevant health effects literature. Part IV contains papers on methods of economic evaluation. Part V contains four papers on various issues related to the estimation of externalities and their use in public policy. The final part is Part VI, and it contains a paper which describes a system for summarizing analysts' assessments of the quality of the information that an analysis uses to estimate externalities. This system allows analysts to provide information, not only on their best estimates, but also on a range of estimates, on uncertainty, on the quality of the data, and on other factors that better reflect the full dimension of making estimates under uncertainty. The system has broad applicability beyond fuel cycle externalities, as well.

  1. Estimating fuel cycle externalities: Analytical methods and issues. Report number 2 on the external costs and benefits of fuel cycles: A study by the U.S. Department of Energy and the Commission of the European Communities

    International Nuclear Information System (INIS)

    1994-07-01

    This report, the second in a series of eight reports, is part of a joint study by the U.S. Department of Energy (DOE) and the Commission of the European Communities (EC) 'on the externalities of fuel cycles.' Part I illustrates the use of the atmospheric dispersion and transformation modeling that this study recommends for airborne pollutants in the coal, biomass, oil, and natural gas fuel cycles. Part II of this volume contains a paper which reviews the scientific literature on ecological impacts associated with power plant discharges. Part III contains papers summarizing the relevant health effects literature. Part IV contains papers on methods of economic evaluation. Part V contains four papers on various issues related to the estimation of externalities and their use in public policy. The final part is Part VI, and it contains a paper which describes a system for summarizing analysts' assessments of the quality of the information that an analysis uses to estimate externalities. This system allows analysts to provide information, not only on their best estimates, but also on a range of estimates, on uncertainty, on the quality of the data, and on other factors that better reflect the full dimension of making estimates under uncertainty. The system has broad applicability beyond fuel cycle externalities, as well

  2. Planning Costs in Certain Stage of the Life Cycle of Investment Activity of Construction Organization

    OpenAIRE

    Iakymchuk Iryna M.

    2017-01-01

    The article discusses the issues related to planning costs in certain stages of the life-cycle of investment activity of construction organization. It has been specified that cost management based on the life-cycle model of the investment project, which is being implemented by a construction organization, allows for a consistent improvement in the efficiency of the innovation process on the basis of a clear planning, as well as cost forecasting. This approach allows for the long-term effectiv...

  3. Ocean Thermal Energy Conversion Life Cycle Cost Assessment, Final Technical Report, 30 May 2012

    Energy Technology Data Exchange (ETDEWEB)

    Martel, Laura [Lockheed Martin, Manassas, VA (United States); Smith, Paul [John Halkyard and Associates: Glosten Associates, Houston, TX (United States); Rizea, Steven [Makai Ocean Engineering, Waimanalo, HI (United States); Van Ryzin, Joe [Makai Ocean Engineering, Waimanalo, HI (United States); Morgan, Charles [Planning Solutions, Inc., Vancouver, WA (United States); Noland, Gary [G. Noland and Associates, Inc., Pleasanton, CA (United States); Pavlosky, Rick [Lockheed Martin, Manassas, VA (United States); Thomas, Michael [Lockheed Martin, Manassas, VA (United States); Halkyard, John [John Halkyard and Associates: Glosten Associates, Houston, TX (United States)

    2012-05-30

    The Ocean Thermal Energy Conversion (OTEC) Life Cycle Cost Assessment (OLCCA) is a study performed by members of the Lockheed Martin (LM) OTEC Team under funding from the Department of Energy (DOE), Award No. DE-EE0002663, dated 01/01/2010. OLCCA objectives are to estimate procurement, operations and maintenance, and overhaul costs for two types of OTEC plants: -Plants moored to the sea floor where the electricity produced by the OTEC plant is directly connected to the grid ashore via a marine power cable (Grid Connected OTEC plants) -Open-ocean grazing OTEC plant-ships producing an energy carrier that is transported to designated ports (Energy Carrier OTEC plants) Costs are developed using the concept of levelized cost of energy established by DOE for use in comparing electricity costs from various generating systems. One area of system costs that had not been developed in detail prior to this analysis was the operations and sustainment (O&S) cost for both types of OTEC plants. Procurement costs, generally referred to as capital expense and O&S costs (operations and maintenance (O&M) costs plus overhaul and replacement costs), are assessed over the 30 year operational life of the plants and an annual annuity calculated to achieve a levelized cost (constant across entire plant life). Dividing this levelized cost by the average annual energy production results in a levelized cost of electricity, or LCOE, for the OTEC plants. Technical and production efficiency enhancements that could result in a lower value of the OTEC LCOE were also explored. The thermal OTEC resource for Oahu, Hawaii and projected build out plan were developed. The estimate of the OTEC resource and LCOE values for the planned OTEC systems enable this information to be displayed as energy supplied versus levelized cost of the supplied energy; this curve is referred to as an Energy Supply Curve. The Oahu Energy Supply Curve represents initial OTEC deployment starting in 2018 and demonstrates the

  4. Nuclear fuel cycle: estimation of physical impacts and monetary valuation for priority pathways

    International Nuclear Information System (INIS)

    Dreicer, M.; Tort, V.; Manen, P.

    1995-02-01

    The decision-making process for setting future energy policy requires a large range of information. An important component in this process is the comparison of the various costs incurred by the different types of energy systems. Among these costs are those that the production and consumption of energy impose on society as a whole. Some of which are borne by the producers and consumers of the energy. However, other social costs have not been internalized in the costing structure of the various fuel cycle, and therefore have not been fully considered in the past. These costs are referred to as external costs. The aim of the ExternE project is the computation of these external costs using a common methodology and the design of a unified framework for the presentation of the results. For direct comparison to be made between energy options, it is necessary that a common approach is taken. Two important categories of physical impacts that potentially fall into the classification of external costs are human health effects and environmental impacts. This report presents a methodology for an assessment of the nuclear fuel cycle that could be applied anywhere in Europe, however in this report, whenever possible, site-specific information for France has been used. The first phase of this project was a joint European Community/U.S. Department of Energy effort and the final results for the priority pathways of the nuclear fuel cycle presented in this document have been compared to the preliminary results reported by the US team at Oak Ridge National Laboratory

  5. Nuclear fuel cycle: estimation of physical impacts and monetary valuation for priority pathways

    Energy Technology Data Exchange (ETDEWEB)

    Dreicer, M; Tort, V; Manen, P

    1995-02-01

    The decision-making process for setting future energy policy requires a large range of information. An important component in this process is the comparison of the various costs incurred by the different types of energy systems. Among these costs are those that the production and consumption of energy impose on society as a whole. Some of which are borne by the producers and consumers of the energy. However, other social costs have not been internalized in the costing structure of the various fuel cycle, and therefore have not been fully considered in the past. These costs are referred to as external costs. The aim of the ExternE project is the computation of these external costs using a common methodology and the design of a unified framework for the presentation of the results. For direct comparison to be made between energy options, it is necessary that a common approach is taken. Two important categories of physical impacts that potentially fall into the classification of external costs are human health effects and environmental impacts. This report presents a methodology for an assessment of the nuclear fuel cycle that could be applied anywhere in Europe, however in this report, whenever possible, site-specific information for France has been used. The first phase of this project was a joint European Community/U.S. Department of Energy effort and the final results for the priority pathways of the nuclear fuel cycle presented in this document have been compared to the preliminary results reported by the US team at Oak Ridge National Laboratory.

  6. Estimating Drilling Cost and Duration Using Copulas Dependencies Models

    Directory of Open Access Journals (Sweden)

    M. Al Kindi

    2017-03-01

    Full Text Available Estimation of drilling budget and duration is a high-level challenge for oil and gas industry. This is due to the many uncertain activities in the drilling procedure such as material prices, overhead cost, inflation, oil prices, well type, and depth of drilling. Therefore, it is essential to consider all these uncertain variables and the nature of relationships between them. This eventually leads into the minimization of the level of uncertainty and yet makes a "good" estimation points for budget and duration given the well type. In this paper, the copula probability theory is used in order to model the dependencies between cost/duration and MRI (mechanical risk index. The MRI is a mathematical computation, which relates various drilling factors such as: water depth, measured depth, true vertical depth in addition to mud weight and horizontal displacement. In general, the value of MRI is utilized as an input for the drilling cost and duration estimations. Therefore, modeling the uncertain dependencies between MRI and both cost and duration using copulas is important. The cost and duration estimates for each well were extracted from the copula dependency model where research study simulate over 10,000 scenarios. These new estimates were later compared to the actual data in order to validate the performance of the procedure. Most of the wells show moderate - weak relationship of MRI dependence, which means that the variation in these wells can be related to MRI but to the extent that it is not the primary source.

  7. Transitioning nuclear fuel cycles with uncertain fast reactor costs

    Energy Technology Data Exchange (ETDEWEB)

    Phathanapirom, U.B., E-mail: bphathanapirom@utexas.edu; Schneider, E.A.

    2016-06-15

    This paper applies a novel decision making methodology to a case study involving choices leading to the transition from the current once-through light water reactor fuel cycle to one relying on continuous recycle of plutonium and minor actinides in fast reactors in the face of uncertain fast reactor capital costs. Unique to this work is a multi-stage treatment of a range of plausible trajectories for the evolution of fast reactor capital costs over time, characterized by first-of-a-kind penalties as well as time- and unit-based learning. The methodology explicitly incorporates uncertainties in key parameters into the decision-making process by constructing a stochastic model and embedding uncertainties as bifurcations in the decision tree. “Hedging” strategies are found by applying a choice criterion to select courses of action which mitigate “regrets”. These regrets are calculated by evaluating the performance of all possible transition strategies for every feasible outcome of the uncertain parameter. The hedging strategies are those that preserve the most flexibility for adjusting the fuel cycle strategy in response to new information as uncertainties are resolved.

  8. Transitioning nuclear fuel cycles with uncertain fast reactor costs

    International Nuclear Information System (INIS)

    Phathanapirom, U.B.; Schneider, E.A.

    2016-01-01

    This paper applies a novel decision making methodology to a case study involving choices leading to the transition from the current once-through light water reactor fuel cycle to one relying on continuous recycle of plutonium and minor actinides in fast reactors in the face of uncertain fast reactor capital costs. Unique to this work is a multi-stage treatment of a range of plausible trajectories for the evolution of fast reactor capital costs over time, characterized by first-of-a-kind penalties as well as time- and unit-based learning. The methodology explicitly incorporates uncertainties in key parameters into the decision-making process by constructing a stochastic model and embedding uncertainties as bifurcations in the decision tree. “Hedging” strategies are found by applying a choice criterion to select courses of action which mitigate “regrets”. These regrets are calculated by evaluating the performance of all possible transition strategies for every feasible outcome of the uncertain parameter. The hedging strategies are those that preserve the most flexibility for adjusting the fuel cycle strategy in response to new information as uncertainties are resolved.

  9. Supplemental report on cost estimates'

    International Nuclear Information System (INIS)

    1992-01-01

    The Office of Management and Budget (OMB) and the U.S. Army Corps of Engineers have completed an analysis of the Department of Energy's (DOE) Fiscal Year (FY) 1993 budget request for its Environmental Restoration and Waste Management (ERWM) program. The results were presented to an interagency review group (IAG) of senior-Administration officials for their consideration in the budget process. This analysis included evaluations of the underlying legal requirements and cost estimates on which the ERWM budget request was based. The major conclusions are contained in a separate report entitled, ''Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program.'' This Corps supplemental report provides greater detail on the cost analysis

  10. Trends in nuclear power plant capital-investment cost estimates - 1976 to 1982

    International Nuclear Information System (INIS)

    Bowers, H.I.; Fuller, L.C.; Myers, M.L.

    1983-09-01

    This report describes trends in power plant capital investment cost estimates over the time period from 1976 to 1982. A review of economic parameters, inflation and escalation rates and cost of money, and a review of cost-size scaling relationships are included. Reference cost estimates are provided for light-water reactor and coal-fired electric power plants based on safety and environmental regulations in effect in January 1982. The sensitivity of the reference cost estimates to numerous economic parameters is analyzed

  11. Life cycle cost of ethanol production from cassava in Thailand

    International Nuclear Information System (INIS)

    Sorapipatana, Chumnong; Yoosin, Suthamma

    2011-01-01

    To increase the security of energy supply, lessen dependence on crude oil import and buffer against the impacts of large change in crude oil prices, the Thai government initiated and officially announced the national ethanol fuel program in year 2000. Since then, domestic ethanol demand has grown rapidly. Presently, all commercial ethanol in Thailand is produced from molasses as Thai law prohibits producing it from sugar cane directly. This is likely to limit ethanol supply in the near future. One possible solution is to supply more ethanol from cassava which is widely cultivated in this country. However, its production cost has not yet been known for certain. The objective of this study is to estimate the life cycle cost of ethanol production from cassava and to assess its economic competitiveness with gasoline in the Thai fuel market. Based on the record of cassava prices during the years 2002-2005, it was found that using it as feedstock would share more than 50% of the ethanol from cassava total production cost. It was also found that a bio-ethanol plant, with a capacity of 150,000 l/day, can produce ethanol from cassava in a range of ex-factory costs from 16.42 to 20.83 baht/l of gasoline equivalent (excluding all taxes), with an average cost of 18.15 baht/l of gasoline equivalent (41, 52 and 45 US cents/l gasoline equivalent respectively, based on 2005 exchange rate). In the same years, the range of 95-octane gasoline prices in Thailand varied from 6.18 baht to 20.86 baht/l, with an average price of 11.50 baht/l (15, 52 and 29 US cents/l respectively, based on 2005 exchange rate) which were much cheaper than the costs of ethanol made from cassava. Thus, we conclude that under the scenario of low to normal crude oil price, ethanol from cassava is not competitive with gasoline. The gasoline price has to rise consistently above 18.15 baht (45 US cents)/l before ethanol made from cassava can be commercially competitive with gasoline. (author)

  12. Life cycle cost of ethanol production from cassava in Thailand

    Energy Technology Data Exchange (ETDEWEB)

    Sorapipatana, Chumnong; Yoosin, Suthamma [Joint Graduate School of Energy and Environment, King Mongkut' s University of Technology Thonburi, Pracha-Uthit Rd., Tungkru, Bangmod, Bangkok 10140 (Thailand); Center for Energy Technology and Environment, Commission on Higher Education, Ministry of Education, Bangkok (Thailand)

    2011-02-15

    To increase the security of energy supply, lessen dependence on crude oil import and buffer against the impacts of large change in crude oil prices, the Thai government initiated and officially announced the national ethanol fuel program in year 2000. Since then, domestic ethanol demand has grown rapidly. Presently, all commercial ethanol in Thailand is produced from molasses as Thai law prohibits producing it from sugar cane directly. This is likely to limit ethanol supply in the near future. One possible solution is to supply more ethanol from cassava which is widely cultivated in this country. However, its production cost has not yet been known for certain. The objective of this study is to estimate the life cycle cost of ethanol production from cassava and to assess its economic competitiveness with gasoline in the Thai fuel market. Based on the record of cassava prices during the years 2002-2005, it was found that using it as feedstock would share more than 50% of the ethanol from cassava total production cost. It was also found that a bio-ethanol plant, with a capacity of 150,000 l/day, can produce ethanol from cassava in a range of ex-factory costs from 16.42 to 20.83 baht/l of gasoline equivalent (excluding all taxes), with an average cost of 18.15 baht/l of gasoline equivalent (41, 52 and 45 US cents/l gasoline equivalent respectively, based on 2005 exchange rate). In the same years, the range of 95-octane gasoline prices in Thailand varied from 6.18 baht to 20.86 baht/l, with an average price of 11.50 baht/l (15, 52 and 29 US cents/l respectively, based on 2005 exchange rate) which were much cheaper than the costs of ethanol made from cassava. Thus, we conclude that under the scenario of low to normal crude oil price, ethanol from cassava is not competitive with gasoline. The gasoline price has to rise consistently above 18.15 baht (45 US cents)/l before ethanol made from cassava can be commercially competitive with gasoline. (author)

  13. Estimating the cost of epilepsy in Europe: a review with economic modeling.

    Science.gov (United States)

    Pugliatti, Maura; Beghi, Ettore; Forsgren, Lars; Ekman, Mattias; Sobocki, Patrik

    2007-12-01

    Based on available epidemiologic, health economic, and international population statistics literature, the cost of epilepsy in Europe was estimated. Europe was defined as the 25 European Union member countries, Iceland, Norway, and Switzerland. Guidelines for epidemiological studies on epilepsy were used for a case definition. A bottom-up prevalence-based cost-of-illness approach, the societal perspective for including the cost items, and the human capital approach as valuation principle for indirect costs were used. The cost estimates were based on selected studies with common methodology and valuation principles. The estimated prevalence of epilepsy in Europe in 2004 was 4.3-7.8 per 1,000. The estimated total cost of the disease in Europe was euro15.5 billion in 2004, indirect cost being the single most dominant cost category (euro8.6 billion). Direct health care costs were euro2.8 billion, outpatient care comprising the largest part (euro1.3 billion). Direct nonmedical cost was euro4.2 billion. That of antiepileptic drugs was euro400 million. The total cost per case was euro2,000-11,500 and the estimated cost per European inhabitant was euro33. Epilepsy is a relevant socioeconomic burden at individual, family, health services, and societal level in Europe. The greater proportion of such burden is outside the formal health care sector, antiepileptic drugs representing a smaller proportion. Lack of economic data from several European countries and other methodological limitations make this report an initial estimate of the cost of epilepsy in Europe. Prospective incidence cost-of-illness studies from well-defined populations and common methodology are encouraged.

  14. Methods for developing useful estimates of the costs associated with birth defects.

    Science.gov (United States)

    Case, Amy P; Canfield, Mark A

    2009-11-01

    Cost estimates for birth defects are useful to policy makers in deciding the best use of resources to prevent these conditions. Much of the effort in this area has focused on spina bifida, in part because cost savings can be estimated from folic acid-preventable cases. However, comprehensive cost-of-illness estimates for this condition may be too outdated, too general, or not applicable to individual states' environments. Using the live birth prevalence for spina bifida in Texas, we applied recent spina bifida cost estimates to approximate total lifetime medical and other costs for an average live birth cohort of spina bifida cases in Texas. In addition, we queried various government programs that provide services for persons with spina bifida to provide program-specific annual costs for this condition. Applying a recently published average lifetime medical cost of $635,000 per case of spina bifida to the average annual birth cohort of 120 Texas cases, an estimated $76 million in direct and indirect medical and other costs will be incurred in Texas over the life span of that cohort. Examples of estimated medical costs for one year are $5 million for infants using actual employer-paid insurance claims data and $6 million combined for children in two public sector programs. Stakeholders and state policy makers may look to state birth defects registries for useful cost data. Although comprehensive state-specific figures are not available, applying prevalence data to existing estimates and obtaining actual claims and program expenditures may help close this information gap.

  15. Life cycle greenhouse gas emissions estimation for small hydropower schemes in India

    International Nuclear Information System (INIS)

    Varun; Prakash, Ravi; Bhat, I.K.

    2012-01-01

    This paper presents for the first time correlations for greenhouse gas (GHG) emissions from small hydropower schemes in India. In this paper an attempt has been made to develop life cycle GHG emissions correlations for three different types of small hydropower schemes (run-of river, canal based and dam-toe) in India. It has been found out that GHG emissions depend on the head and capacity of the small hydropower project. The results obtained from correlations show good agreement with the estimated results using EIO-LCA (Economic Input–Output-Life Cycle Assessment) technique. These correlations may be useful for the development of new small hydropower (SHP) schemes, as they can be used to predict life cycle GHG emissions based on capacity, head and type of SHP schemes. -- Highlights: ► A study has been carried out for the Life Cycle Greenhouse gas emissions estimation for SHP schemes in India. ► Around 145 SHP schemes have been studied and their GHG emissions have been estimated. ► Based upon these results correlations have been developed for three different types of SHP schemes.

  16. Survey of nuclear fuel cycle economics: 1970--1985

    International Nuclear Information System (INIS)

    Prince, B.E.; Peerenboom, J.P.; Delene, J.G.

    1977-03-01

    This report is intended to provide a coherent view of the diversity of factors that may affect nuclear fuel cycle economics through about 1985. The nuclear fuel cycle was surveyed as to past trends, current problems, and future considerations. Unit costs were projected for each step in the fuel cycle. Nuclear fuel accounting procedures were reviewed; methods of calculating fuel costs were examined; and application was made to Light Water Reactors (LWR) over the next decade. A method conforming to Federal Power Commission accounting procedures and used by utilities to account for backend fuel-cycle costs was described which assigns a zero net salvage value to discharged fuel. LWR fuel cycle costs of from 4 to 6 mills/kWhr (1976 dollars) were estimated for 1985. These are expected to reach 6 to 9 mills/kWr if the effect of inflation is included

  17. Waste Management Facilities cost information for mixed low-level waste. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Shropshire, D.; Sherick, M.; Biadgi, C.

    1995-06-01

    This report contains preconceptual designs and planning level life-cycle cost estimates for managing mixed low-level waste. The report`s information on treatment, storage, and disposal modules can be integrated to develop total life-cycle costs for various waste management options. A procedure to guide the US Department of Energy and its contractor personnel in the use of cost estimation data is also summarized in this report.

  18. Case Study to Apply Work Difficulty Factors to Decommissioning Cost Estimates

    Energy Technology Data Exchange (ETDEWEB)

    Yun, Taesik; Jung, Hyejin; Oh, Jaeyoung; Kim, Younggook [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    This article is prepared as a guideline regarding how to apply the work difficult factor (WDF) when it comes to the estimates of the decommissioning costs. Although several cases of the decommissioning cost estimates have been made for a few commercial nuclear power plants, the different technical, site-specific economic assumptions used make it difficult to interpret those cost estimates and compare them with that of Kori-1. In addition, it is clear that we are supposed to experience difficulties being created in the process of the Kori-1 and the virtual inaccessibility to the limited areas at the pre-decommissioning stage. Estimating decommissioning costs is one of the most crucial processes since it encompasses all the spectrum of decommissioning activities from the planning to the last evaluation on whether the decommissioning has successfully been proceeded from the safety and economic perspectives. Here I suggested the activity dependent costs is only related to WDFs of the incumbent plant planning or undergone to be decommissioned since as a matter of fact, estimating WDFs is the core process to articulately scrutinize the practical costs to apply to Kori-1 project.

  19. Life cycle cost analysis of solar heating and DHW systems in residential buildings

    International Nuclear Information System (INIS)

    Colombo, R.; Gilliaert, D.

    1992-01-01

    Economic Life Cycle Cost Analysis (ELCCA) is an easy and friendly computer program, IBM compatible for economic evaluation of solar energy system which involves comparison of the capital and operating costs of a conventional system. In this section we would like to suggest the ELCCA-PC program as a new tools using life cycle cost analysis for annual and cumulative cash flow methodology that take into account all future expenses. ELCCA-PC program considers fixed and changeable items that are involved in installing the equipment such as interest of money borrowed, property and income taxes, current energy cost for electricity operating system, maintenance, insurance and fuel costs and other economic operating expenses. Moreover fraction of annual heating load supplied from solar system is considered in this analysis. ECC-PC program determines the yearly outflow of money over the period of an economic analysis that can be converted to a series of equal payments in today's money

  20. Life cycle cost analysis to examine the economical feasibility of hydrogen as an alternative fuel

    International Nuclear Information System (INIS)

    Lee, Ji-Yong; Yoo, Moosang; Cha, Kyounghoon; Hur, Tak; Lim, Tae Won

    2009-01-01

    This study uses a life cycle costing (LCC) methodology to identify when hydrogen can become economically feasible compared to the conventional fuels and which energy policy is the most effective at fostering the penetration of hydrogen in the competitive fuel market. The target hydrogen pathways in this study are H 2 via natural gas steam reforming (NG SR), H 2 via naphtha steam reforming (Naphtha SR), H 2 via liquefied petroleum gas steam reforming (LPG SR), and H 2 via water electrolysis (WE). In addition, the conventional fuels (gasoline, diesel) are also included for the comparison with the H 2 pathways. The life cycle costs of the target fuels are computed and several key factors are examined to identify the economical feasibilities of the target systems: fuel cell vehicle (FCV) price, social cost of greenhouse gases (GHGs) and regulated air emissions (CO, VOC, SO x , NO x , PM), fuel efficiency of FCV, capital costs of H 2 equipments at a H 2 fueling station. The life cycle costs of a H 2 pathway also depend on the production capacity. Although, at present, all H 2 pathways are more cost efficient than the conventional fuels in the fuel utilization stage, the H 2 pathways have lack competitiveness against the conventional fuels in the life cycle (well to wheel) costs due to the high price of FCV. From future scenario analyses in 2015, all H 2 pathways are expected to have lower life cycle costs than the conventional fuels as a transportation fuel. It is evident that the FCV price is the most important factor for encouraging the hydrogen economy and FCVs. Unless the FCV price is below US $62,320, it is necessary for the institution to subsidize the FCV price by any amount over US $62,320 in order to inject H 2 into the market of transportation fuel. The incentive or taxes on GHGs and regulated air emissions are also expected to effectively encourage the diffusion of H 2 and FCV, especially for the H 2 pathway of WE with wind power (WE[Wind]). The uncertainties

  1. Fuzzy/Neural Software Estimates Costs of Rocket-Engine Tests

    Science.gov (United States)

    Douglas, Freddie; Bourgeois, Edit Kaminsky

    2005-01-01

    The Highly Accurate Cost Estimating Model (HACEM) is a software system for estimating the costs of testing rocket engines and components at Stennis Space Center. HACEM is built on a foundation of adaptive-network-based fuzzy inference systems (ANFIS) a hybrid software concept that combines the adaptive capabilities of neural networks with the ease of development and additional benefits of fuzzy-logic-based systems. In ANFIS, fuzzy inference systems are trained by use of neural networks. HACEM includes selectable subsystems that utilize various numbers and types of inputs, various numbers of fuzzy membership functions, and various input-preprocessing techniques. The inputs to HACEM are parameters of specific tests or series of tests. These parameters include test type (component or engine test), number and duration of tests, and thrust level(s) (in the case of engine tests). The ANFIS in HACEM are trained by use of sets of these parameters, along with costs of past tests. Thereafter, the user feeds HACEM a simple input text file that contains the parameters of a planned test or series of tests, the user selects the desired HACEM subsystem, and the subsystem processes the parameters into an estimate of cost(s).

  2. Investment opportunity : the FPL low-cost solar dry kiln

    Science.gov (United States)

    George B. Harpole

    1988-01-01

    Two equations are presented that may be used to estimate a maximum investment limit and working capital requirements for the FPL low-cost solar dry kiln systems. The equations require data for drying cycle time, green lumber cost, and kiln-dried lumber costs. Results are intended to provide a preliminary estimate.

  3. Life cycle cost optimization of buildings with regard to energy use, thermal indoor environment and daylight

    DEFF Research Database (Denmark)

    Nielsen, Toke Rammer; Svendsen, Svend

    2002-01-01

    by the life cycle cost taking all expenses in the buildings service life into consideration. Also the performance of buildings is important as the performance influences the comfort of the occupants, heating demand etc. Different performance requirements are stated in building codes, standards......Buildings represent a large economical investment and have long service lives through which expenses for heating, cooling, maintenance and replacement depends on the chosen building design. Therefore, the building cost should not only be evaluated by the initial investment cost but rather...... and by the customer. The influence of different design variables on life cycle cost and building performance is very complicated and the design variables can be combined in an almost unlimited number of ways. Optimization can be applied to achieve a building design with low life cycle cost and good performance...

  4. Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review

    Energy Technology Data Exchange (ETDEWEB)

    Ruth, M.

    2011-10-01

    This independent review is the conclusion arrived at from data collection, document reviews, interviews and deliberation from December 2010 through April 2011 and the technical potential of Hydrogen Production Cost Estimate Using Biomass Gasification. The Panel reviewed the current H2A case (Version 2.12, Case 01D) for hydrogen production via biomass gasification and identified four principal components of hydrogen levelized cost: CapEx; feedstock costs; project financing structure; efficiency/hydrogen yield. The panel reexamined the assumptions around these components and arrived at new estimates and approaches that better reflect the current technology and business environments.

  5. On Cost Estimate for Decommissioning of one Isotope Central

    International Nuclear Information System (INIS)

    Marek Vasko et al

    2010-08-01

    The main scope of this study has been to calculate the future cost for decommission and dismantling the Isotope central at the Studsvik site using the OMEGA CODE. Detailed empirical information is used in the study for 'bench-marking' purposes, in such cases when there is a need to supplement and correct field data from the industry. In the present study, data has been retrieved and organized such that the estimated costs for decommissioning of the Isotope Central become transparent and reliable. This approach gives a preliminary qualitative indication about the accuracy of the cost estimate delivered by the industry

  6. On Cost Estimate for Decommissioning of one Isotope Central

    Energy Technology Data Exchange (ETDEWEB)

    Marek Vasko et al

    2010-08-15

    The main scope of this study has been to calculate the future cost for decommission and dismantling the Isotope central at the Studsvik site using the OMEGA CODE. Detailed empirical information is used in the study for 'bench-marking' purposes, in such cases when there is a need to supplement and correct field data from the industry. In the present study, data has been retrieved and organized such that the estimated costs for decommissioning of the Isotope Central become transparent and reliable. This approach gives a preliminary qualitative indication about the accuracy of the cost estimate delivered by the industry

  7. Cost estimating issues in the Russian integrated system planning context

    International Nuclear Information System (INIS)

    Allentuck, J.

    1996-01-01

    An important factor in the credibility of an optimal capacity expansion plan is the accuracy of cost estimates given the uncertainty of future economic conditions. This paper examines the problems associated with estimating investment and operating costs in the Russian nuclear power context over the period 1994 to 2010

  8. Structure of Cost of Equity as the Dependence on the Corporate- and Market Life Cycle

    Directory of Open Access Journals (Sweden)

    Zdeněk Konečný

    2013-10-01

    Full Text Available Purpose of the article: Companies, like all living creatures, goes through their life cycle, which includes some partial phases. Each of these phases is specific. Depending up the corporate life cycle, there are changed managerial decisions, that have an considerable influence, among others, on financial indicators like liquidity (current ratio, quick ratio, cash ratio, return (on investment, assets, equity, sales, economic value added, or cost of capital. The purpose of this article is to show relations between corporate life cycle and the structure of cost of equity. Furthermore, there will be, besides the corporate life cycle, considered also the market life cycle and market positions, that can companies hold on the market, on which they are acting. Methodology/methods: There is used a method, based on the analysis of secondary data, gotten from financial statements of selected companies and from statistical and analytical documents, published by Czech Ministry of Industry and Trade. There are selected 39 companies, acting on the czech market with motor vehicles production. The data are gathered for periods from 2002 up to 2010. There is used a model by Reiners (2004 to identify phases of corporate- and market life cycle and market positions. For finding out the structure of cost of equity there is used the constructional model by Czech Ministry of Industry and Trade. Scientific aim: The selected companies are divided into groups with considering different phases of their life cycle and with considering their different market positions. There are for each period found out numbers of companies from these groups, that reached the minimal value, the value within the interval and maximal value of all risk rewards, that are, besides the riskless rate, components of cost of equity. Findings: The greatest part of cost of equity, reached on the market, is the riskless rate. Other components (and their shares on the cost of equity

  9. Importance of funding in decommissioning cost estimates

    International Nuclear Information System (INIS)

    Mingst, B.C.

    1987-01-01

    Decommissioning cost estimates have been made by several study groups for the decommissioning of pressurized-water and boiling-water nuclear power stations. The results of these studies are comparable when corrected for inflation and the differences in contingency factors applied by the study groups. The estimated dismantling costs differ far less than a factor of 2 in all cases, despite the design differences found in the plants that were studied. An analysis of the different methods available for funding the dismantling of these facilities shows the much stronger effect that the choice of funding methods has on the net cost of decommissioning. The total cost of dismantling may vary more than a factor of 4 from one funding method to another, assuming current or recent historical inflation rates. The funding methods evaluated include sinking funds, deposits, negative-salvage value depreciation, and insurance. These funding methods are taken from the NRC's Notice of Proposed Rulemaking description of acceptable funding methods. The funding analysis for this study was performed using the DECOST-86 computer code. The evaluation of funding options for a nuclear facility, and the appropriate choice of the funding method best for that facility, are found to be more important than detailed engineering studies in determining the net cost of decommissioning during the early portions of the plant's operating lifetime

  10. Life-cycle private costs of hybrid electric vehicles in the current Chinese market

    International Nuclear Information System (INIS)

    Lin, Chengtao; Wu, Tian; Ou, Xunmin; Zhang, Qian; Zhang, Xu; Zhang, Xiliang

    2013-01-01

    Understanding the life-cycle private cost (LCPC) of the hybrid electric vehicle (HEV) is important for market feasibility analysis. An HEV LCPC model was established to evaluate HEV market prospects in China compared with traditional internal combustion engine vehicles (ICEV). The Kluger HV, a full-hybrid HEV sports utility vehicle (SUV), aimed at the Chinese market, was simulated as the 2010 model's technology details were well publicized. The LCPC of the Kluger HV was roughly the same (about 1.06 times) as that of its comparable ICEV (Highlander SUV). This aligns with other compact and midsize HEV cars (e.g., Toyota Prius, Honda Civic and Toyota Camry HEV) in China. With oil prices predicted to rise in the long-term, the advantage of HEVs energy saving will partly compensate the high manufacturing costs associated with their additional motor/battery components. Besides supporting technology development, enabling policy should be implemented to introduce HEV technology into taxi fleets and business cars. This technology's cost-competitiveness, compared with traditional ICEVs, is advantageous for these higher mileage vehicles. - Highlights: ► A model is set up to evaluate the life-cycle private cost of HEVs. ► Life-cycle private costs of HEVs are higher than conventional cars in China. ► HEVs become competitive when the oil price rises

  11. Estimating the cost of production stoppage

    Science.gov (United States)

    Delionback, L. M.

    1979-01-01

    Estimation model considers learning curve quantities, and time of break to forecast losses due to break in production schedule. Major parameters capable of predicting costs are number of units made prior to production sequence, length of production break, and slope of learning curve produced prior to break.

  12. Sensitivity of nuclear fuel-cycle cost to uncertainties in nuclear data. Final report

    International Nuclear Information System (INIS)

    Becker, M.; Harris, D.R.

    1980-11-01

    An improved capability for assessing the economic implications of uncertainties in nuclear data and methods on the power reactor fuel cycle was developed. This capability is applied to the sensitivity analysis of fuel-cycle cost with respect to changes in nuclear data and related computational methods. Broad group sensitivities for both a typical BWR and a PWR are determined under the assumption of a throwaway fuel cycle as well as for a scenario under which reprocessing is allowed. Particularly large dollar implications are found for the thermal and resonance cross sections of fissile and fertile materials. Sensitivities for the throwaway case are found to be significantly larger than for the recycle case. Constrained sensitivities obtained for cases in which information from critical experiments or other benchmarks is used in the design calculation to adjust a parameter such as anti ν are compared with unconstrained sensitivities. Sensitivities of various alternate fuel cycles were examined. These included the extended-burnup (18-month) LWR cycle, the mixed-oxide (plutonium) cycle, uranium-thorium and denatured uranium-thorium cycles, as well as CANDU-type reactor cycles. The importance of the thermal capture and fission cross sections of 239 Pu is shown to be very large in all cases. Detailed, energy dependent sensitivity profiles are provided for the thermal range (below 1.855 eV). Finally, sensitivity coefficients are combined with data uncertainties to determine the impact of such uncertainties on fuel-cycle cost parameters

  13. A level playing field-obtaining consistent cost estimates for advanced reactor designs

    International Nuclear Information System (INIS)

    Hudson, C.R.; Rohm, H.H.; Humphreys, J.R.

    1987-01-01

    A level playing field in sports is necessary to avoid a situation in which a team has an unfair advantage over its competition. Similarly, rules and guidelines for developing cost estimates can be established which, in effect, provide a level playing field whereby cost estimates for advanced power plant concepts can be presented on a consistent and equitable basis. As an example, consider the capital costs shown in Table 1. Both sets of cost are for the exact same power plant; Estimate 1 is expressed in constant dollars while Estimate 2 is presented in nominal or as-spent dollars. As shown, the costs in Table 1 are not directly comparable. Similar problems can be introduced as a result of differing assumptions in any number of parameters including the scope of the cost estimate, inflation/escalation and interest rates, contingency costs, and site location. Of course, the motivation for having consistent cost estimates is to permit comparison among various concepts. As the U.S. Department of Energy sponsors research and development work on several advanced reactor concepts in which expected cost is a key evaluation parameter, the emphasis in this particular endeavor has been in promoting the comparability of advanced reactor cost estimates among themselves and to existing power plant types. To continue with the analogy, the idea is to lay out the playing field and the rules of the contest such that each team participates in the match on an equal basis with the final score being solely determined by the inherent strengths and abilities of the teams. A description of the playing field and some of the more important rules will now be provided

  14. Production costs: U.S. gas turbine ampersand combined-cycle power plants

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This fourth edition of UDI's gas turbine O ampersand M cost report gives 1991 operation and maintenance expenses for over 450 US gas turbine power plants. Modeled on UDI's popular series of O ampersand M cost reports for US steam-electric plants, this report shows operator and plant name, plant year-in-service, installed capacity, 1991 net generation, total fuel expenses, total non-fuel O ampersand M expenses, total production costs, and current plant capitalization. Coverage includes over 90 percent of the utility-owned gas/combustion turbine and combined-cycle plants installed in the country

  15. Cost estimates for Operation Desert Shield/Desert Storm: a budgetary analysis

    OpenAIRE

    Johnson, J. Andrew.

    1991-01-01

    Operation Desert Shield/Desert Storm (DS/DS) presented unique challenges for estimating the cost of that conflict. This analysis reviews the cost estimates and methodologies developed for that purpose by DoD, CBO and GAO. It considers the budget climate and the role of foreign cash and in-kind contributions. Finally, it reviews the budgeting innovations used to provide and monitor DS/DS defense spending. At the outset of the crisis, costs were estimated to determine the defense funding requir...

  16. An Evaluation of the Automated Cost Estimating Integrated Tools (ACEIT) System

    Science.gov (United States)

    1989-09-01

    C~4p DTIC S ELECTE fl JAN12 19 .1R ~OF S%. B -U AN EVALUATION OF THE AUTOMATED COST ESTIMATING INTEGRATED TOOLS ( ACEIT ) SYSTEM THESIS Caroline L...Ohio go 91 022 AFIT/GCA/LSQ/89S-5 AN EVALUATION OF THE AUTOMATED COST ESTIMATING INTEGRATED TOOLS ( ACEIT ) SYSTEM THESIS Caroline L. Hanson Major, USAF...Department of Defense. AFIT/GCA/LSQ/89S-5 AN EVALUATION OF THE AUTOMATED COST ESTIMATING INTEGRATED TOOLS ( ACEIT ) SYSTEM THESIS Presented to the

  17. Cea assessment of the sulphur-iodine cycle for hydrogen production

    International Nuclear Information System (INIS)

    Caries, Ph.; Vitart, X.; Yvon, P.

    2010-01-01

    The sulphur-iodine cycle is a promising process for hydrogen production using nuclear heat: - it is a purely thermochemical cycle, implying that hydrogen production will scale with volume rather than surface; - it only involves fluids, thus avoiding the often difficult handling of solids; - its heat requirements are well matched to the temperatures available from a Generation IV very/high temperature reactor. These characteristics seem very attractive for high efficiency and low cost massive hydrogen production. On the other hand, the efficiency of the cycle may suffer from the large over-stoichiometries of water and iodine and the very important heat exchanges it involves; furthermore, due to lack of adequate thermodynamic models, its efficiency is difficult to assess with confidence. Besides, the large quantities of chemicals that need to be handled, and the corrosiveness of these chemicals, are factors not to be overlooked in terms of investment and operation costs. In order to assess the actual potential of the sulphur-iodine cycle for massive hydrogen production at a competitive cost, CEA has been conducting an important programme on this cycle, ranging from thermodynamic measurements to hydrogen production cost evaluation, with flow sheet optimisation, component sizing and investment cost estimation as intermediate steps. The paper will present the method used, the status of both efficiency and production cost estimations, and discuss perspectives for improvement. (authors)

  18. Cost estimate for electrostatically plugged cusp reactor

    International Nuclear Information System (INIS)

    Dolan, T.J.

    1977-01-01

    A preliminary design of an electrostatically plugged cusp reactor was presented in (UCRL-52142(1976)). The capital costs of the various components of this reactor are estimated and totaled for two different blanket configurations: one having an energy multiplication factor M = 1.2, and the other having M = 1.68. The unoptimized direct capital costs for these cases are found to be about 1400 and 950 $/kWe, respectively

  19. Economic Analysis of Several Nuclear Fuel Cycles

    International Nuclear Information System (INIS)

    Ko, Won Il; Gao, Fanxing; Kim, Sung Ki

    2012-01-01

    appropriate for an estimate on the costs of energy given the various technologies. Levelized fuel cycle cost (LFCC) and levelized generation cost (LGC) have offered effective indicators for economic comparison among nuclear fuel cycles and were adopted to compare the fuel cycle options considered in this study. The unpredictable change of the unit costs of several key components due to the uncertainties can lead to considerable differences in levelized costs among the fuel cycle alternatives. To take these unavoidable uncertainties into account, a wide scale was applied to each unit cost and a distribution of levelized cost was also obtained

  20. Estimation of the cost of large-scale school deworming programmes with benzimidazoles

    Science.gov (United States)

    Montresor, A.; Gabrielli, A.F.; Engels, D.

    2017-01-01

    Summary This study estimates the cost of distributing benzimidazole tablets in the context of school deworming programmes: we analysed studies reporting the cost of school deworming from seven countries in four WHO regions. The estimated cost for drug procurement to cover one million children (including customs clearance and international transport) is approximately US$20 000. The estimated financial costs (including the cost of training of personnel, drug transport, social mobilization and monitoring) is, on average, equivalent to US$33 000 per million school-age children with minimal variation in different countries and continents. The estimated economic costs of distribution (including the time spent by teachers, and health personnel at central, provincial and district level) to cover one million children approximately corresponds to US$19 000. This study shows the minimal cost of school deworming activities, but also shows the significant contribution (corresponding to a quarter of the entire cost of the programme) provided by health and education systems in endemic countries even in the case of drug donations and donor support of distribution costs. PMID:19926104

  1. Cost estimation for decommissioning of research reactors

    International Nuclear Information System (INIS)

    Grossi, Pablo Andrade; Tello, Cledola Cassia Oliveira de; Segabinaze, Roberto de Oliveira; Daniska, Vladimir

    2013-01-01

    In the case of research reactors, the limited data that is available tends to provide only overall decommissioning costs, without any breakdown of the main cost elements. In order to address this subject, it is important to collect and analyse all available data of decommissioning costs for the research reactors. The IAEA has started the DACCORD Project focused on data analysis and costing of research reactors decommissioning. Data collection is organized in accordance with the International Structure for Decommissioning Costing (ISDC), developed jointly by the IAEA, the OECD Nuclear Energy Agency and the European Commission. The specific aims of the project include the development of representative and comparative data and datasets for preliminary costing for decommissioning. This paper will focus on presenting a technique to consider several representative input data in accordance with the ISDC structure and using the CERREX (Cost Estimation for Research Reactors in Excel) software developed by IAEA. (author)

  2. Waste Management facilities cost information: System Cost Model Software Quality Assurance Plan. Revision 2

    International Nuclear Information System (INIS)

    Peterson, B.L.; Lundeen, A.S.

    1996-02-01

    In May of 1994, Lockheed Idaho Technologies Company (LITCO) in Idaho Falls, Idaho and subcontractors developed the System Cost Model (SCM) application. The SCM estimates life-cycle costs of the entire US Department of Energy (DOE) complex for designing; constructing; operating; and decommissioning treatment, storage, and disposal (TSD) facilities for mixed low-level, low-level, transuranic, and mixed transuranic waste. The SCM uses parametric cost functions to estimate life-cycle costs for various treatment, storage, and disposal modules which reflect planned and existing facilities at DOE installations. In addition, SCM can model new facilities based on capacity needs over the program life cycle. The SCM also provides transportation costs for truck and rail, which include transport of contact-handled, remote-handled, and alpha (transuranic) wastes. The user can provide input data (default data is included in the SCM) including the volume and nature of waste to be managed, the time period over which the waste is to be managed, and the configuration of the waste management complex (i.e., where each installation's generated waste will be treated, stored, and disposed). Then the SCM uses parametric cost equations to estimate the costs of pre-operations (designing), construction costs, operation management, and decommissioning these waste management facilities. For the product to be effective and useful the SCM users must have a high level of confidence in the data generated by the software model. The SCM Software Quality Assurance Plan is part of the overall SCM project management effort to ensure that the SCM is maintained as a quality product and can be relied on to produce viable planning data. This document defines tasks and deliverables to ensure continued product integrity, provide increased confidence in the accuracy of the data generated, and meet the LITCO's quality standards during the software maintenance phase. 8 refs., 1 tab

  3. Waste Management facilities cost information: System Cost Model Software Quality Assurance Plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, B.L.; Lundeen, A.S.

    1996-02-01

    In May of 1994, Lockheed Idaho Technologies Company (LITCO) in Idaho Falls, Idaho and subcontractors developed the System Cost Model (SCM) application. The SCM estimates life-cycle costs of the entire US Department of Energy (DOE) complex for designing; constructing; operating; and decommissioning treatment, storage, and disposal (TSD) facilities for mixed low-level, low-level, transuranic, and mixed transuranic waste. The SCM uses parametric cost functions to estimate life-cycle costs for various treatment, storage, and disposal modules which reflect planned and existing facilities at DOE installations. In addition, SCM can model new facilities based on capacity needs over the program life cycle. The SCM also provides transportation costs for truck and rail, which include transport of contact-handled, remote-handled, and alpha (transuranic) wastes. The user can provide input data (default data is included in the SCM) including the volume and nature of waste to be managed, the time period over which the waste is to be managed, and the configuration of the waste management complex (i.e., where each installation`s generated waste will be treated, stored, and disposed). Then the SCM uses parametric cost equations to estimate the costs of pre-operations (designing), construction costs, operation management, and decommissioning these waste management facilities. For the product to be effective and useful the SCM users must have a high level of confidence in the data generated by the software model. The SCM Software Quality Assurance Plan is part of the overall SCM project management effort to ensure that the SCM is maintained as a quality product and can be relied on to produce viable planning data. This document defines tasks and deliverables to ensure continued product integrity, provide increased confidence in the accuracy of the data generated, and meet the LITCO`s quality standards during the software maintenance phase. 8 refs., 1 tab.

  4. A framework of initiatives for successful application of life cycle costing (LCC in industrialised building system (IBS in Malaysian construction industry

    Directory of Open Access Journals (Sweden)

    Shamsuddin Siti Mazzuana

    2017-01-01

    Full Text Available Industrialised Building System (IBS contributes a great shift in sustainable construction and benefits the society. Previous studies have proven in general that one of the hindrances in promoting sustainable in IBS, is a high cost for any pre-cast material specifically thus effected the overall cost. The introduction of Life Cycle Costing (LCC leads into providing a better and comprehensive cost estimation, including projecting actual cost to operate the building, hence providing a better baseline for decision making. The lacking application of LCC in IBS is still in trivial impact, therefore, this paper presents a framework which produced by expressing the successful initiatives of LCC and IBS in Malaysia construction industry. The framework developed based on findings from the extensive literature reviews, 164 responded questionnaires, and 19 expert opinions, which has three sections: Strategy Development, System Development and the last part is Decision Level. Aspects of objectivity, practicality, reliability, completeness that were likely to be implemented in the Malaysian construction industry were used. There are significant opinions on the usefulness and completeness of the proposed framework in providing a comprehensive cost estimates which helps much in deciding to carry out IBS or remain with a traditional construction method.

  5. Estimation of uranium resources by life-cycle or discovery-rate models: a critique

    International Nuclear Information System (INIS)

    Harris, D.P.

    1976-10-01

    This report was motivated primarily by M. A. Lieberman's ''United States Uranium Resources: An Analysis of Historical Data'' (Science, April 30). His conclusion that only 87,000 tons of U 3 O 8 resources recoverable at a forward cost of $8/lb remain to be discovered is criticized. It is shown that there is no theoretical basis for selecting the exponential or any other function for the discovery rate. Some of the economic (productivity, inflation) and data issues involved in the analysis of undiscovered, recoverable U 3 O 8 resources on discovery rates of $8 reserves are discussed. The problem of the ratio of undiscovered $30 resources to undiscovered $8 resources is considered. It is concluded that: all methods for the estimation of unknown resources must employ a model of some form of the endowment-exploration-production complex, but every model is a simplification of the real world, and every estimate is intrinsically uncertain. The life-cycle model is useless for the appraisal of undiscovered, recoverable U 3 O 8 , and the discovery rate model underestimates these resources

  6. A comparison study on radioactive waste management effectiveness in various nuclear fuel cycles

    International Nuclear Information System (INIS)

    Ko, Won Il; Kim, Ho Dong

    2001-07-01

    This study examines whether the DUPIC (Direct Use of Spent PWR Fuel In CANDU) fuel cycle make radioactive waste management more effective, by comparing it with other fuel cycles such as the PWR (Pressurized Water Reactor) once-through cycle, the HWR (Pressurized Heavy Water Reactor) once-through cycle and the thermal recycling option to use an existing PWR with MOX (Mixed Oxide) fuel. This study first focuses on the radioactive waste volume generated in all fuel cycle steps, which could be one of the measures of effectiveness of the waste management. Then the total radioactive waste disposition cost is estimated based on two units measuring; m3/GWe-yr and US$/GWe-yr. We find from the radioactive waste volume estimation that the DUPIC fuel cycle could have lower volumes for milling tailings, low level waste and spent fuel than those of other fuel cycle options. From the results of the disposition cost analysis, we find that the DUPIC waste disposition cost is the lowest among fuel cycle options. If the total waste disposition cost is used as a proxy for quantifying the easiness or difficulty in managing wastes, then the DUPIC option actually make waste management easier

  7. Walking- and cycling track networks in Norwegian cities : cost-benefit analyses including health effects and external costs of road traffic : summary

    Science.gov (United States)

    2002-04-01

    Cost- benefit analyses of walking- and cycling track net-works in three Norwegian cities are presented in this study. A project group working with a National Cycling Strategy in Norway initialised the study. Motivation for starting the study is the P...

  8. Retrofitted Solar Domestic Hot Water Systems for Swedish Single-Family Houses—Evaluation of a Prototype and Life-Cycle Cost Analysis

    Directory of Open Access Journals (Sweden)

    Luis Ricardo Bernardo

    2016-11-01

    Full Text Available According to recent technology road maps, system cost reductions and development of standardised plug-and-function systems are some of the most important goals for solar heating technology development. Retrofitting hot water boilers in single-family houses when installing solar collectors has the potential to significantly reduce both material and installation costs. Previous studies have investigated such retrofitting, using theoretical simulations and laboratory tests, but no actual installations were made and tested in practice. This article describes the installation, measured performance and cost effectiveness of a retrofitting solution that converts existing domestic hot water heaters to a solar domestic hot water system. The measured performance is characterised by the monthly and annual solar fractions. The cost effectiveness is evaluated by a life-cycle cost analysis, comparing the retrofitted system to a conventional solar domestic hot water system and the case without any solar heating system. Measurements showed that approximately 50% of the 5000 kWh/year of domestic hot water consumption was saved by the retrofitted system in south Sweden. Such savings are in agreement with previous estimations and are comparable to the energy savings when using a conventional solar domestic hot water system. The life-cycle cost analysis showed that, according to the assumptions and given climate, the return on investment of the retrofitted system is approximately 17 years, while a conventional system does not reach profitability during its lifetime of 25 years.

  9. The Software Cost Estimation Method Based on Fuzzy Ontology

    Directory of Open Access Journals (Sweden)

    Plecka Przemysław

    2014-12-01

    Full Text Available In the course of sales process of Enterprise Resource Planning (ERP Systems, it turns out that the standard system must be extended or changed (modified according to specific customer’s requirements. Therefore, suppliers face the problem of determining the cost of additional works. Most methods of cost estimation bring satisfactory results only at the stage of pre-implementation analysis. However, suppliers need to know the estimated cost as early as at the stage of trade talks. During contract negotiations, they expect not only the information about the costs of works, but also about the risk of exceeding these costs or about the margin of safety. One method that gives more accurate results at the stage of trade talks is the method based on the ontology of implementation costs. This paper proposes modification of the method involving the use of fuzzy attributes, classes, instances and relations in the ontology. The result provides not only the information about the value of work, but also about the minimum and maximum expected cost, and the most likely range of costs. This solution allows suppliers to effectively negotiate the contract and increase the chances of successful completion of the project.

  10. State-Level Estimates of Obesity-Attributable Costs of Absenteeism

    Science.gov (United States)

    Andreyeva, Tatiana; Luedicke, Joerg; Wang, Y. Claire

    2014-01-01

    Objective To provide state-level estimates of obesity-attributable costs of absenteeism among working adults in the U.S. Methods Nationally-representative data from the National Health and Nutrition Examination Survey (NHANES) for 1998–2008 and from the Behavioral Risk Factor Surveillance System (BRFSS) for 2012 are examined. The outcome is obesity-attributable workdays missed in the previous year due to health, and their costs to states. Results Obesity, but not overweight, is associated with a significant increase in workdays absent, from 1.1 to 1.7 extra days missed annually compared to normal weight employees. Obesity-attributable absenteeism among American workers costs the nation an estimated $8.65 billion per year. Conclusion Obesity imposes a considerable financial burden on states, accounting for 6.5%–12.6% of total absenteeism costs in the workplace. State legislature and employers should seek effective ways to reduce these costs. PMID:25376405

  11. LIFE CYCLE COSTING DAN EKSTERNALITAS BIODIESEL DARI MINYAK SAWIT DAN MINYAK ALGA DI INDONESIA (Life Cycle Costing and Externities of Palm and Algal Biodiesel in Indonesia

    Directory of Open Access Journals (Sweden)

    Arif Dwi Santoso

    2014-10-01

    perannya dalam mitigasi GRK yang turut memperbesar peluang sebagai bahan utama biodiesel di masa depan.   ABSTRACT The high cost of biodiesel production was to be an obstacle conversion to biodiesel fuel including Indonesia due to anticipate the energy crisis. The high cost of production due to the variable cost of production has not fully comparable reflect the overall potential contained in biodiesel. Potential biodiesel belonging to the commodity nature of the environment such as renewable biomass, low in land use, and environmentally friendly should be included in the calculation in order to obtain an objective comparison of the calculations.This study aimed to evaluate the effect of adding commodities to the structure of the production cost of biodiesel between palm oil and algal oil. Estimated value of the commodity by the method of benefit transfer method shows the value used is the approach gains willingness to pay (WTP. Environmental commodity values referenced from the calculation software Environmental Priority Strategy (EPS version 2000. For the case of Indonesia, the commodity value of the elasticity was infered EPS basis of comparison of income per capita of Sweden and Indonesia.The results stated that the analysis of life cycle costing (LCC applied by adding variable externalities can provide detailed information about the composition of biodiesel production costs and can be used as a method to get a total picture of the most competitive production costs from several sources. The analysis also concluded that the externality variables also affect the total cost of biodiesel production by up to 14%. Profitability analysis stated that the algal biomass for biodiesel production more secure and sustainable than palm biomass due to technical and non-technical constraints on the production of algal biomass more easier to treat but it also advantages role in GHG mitigation that helped widen the opportunities as the main ingredient of biodiesel in the futur

  12. A comparison of two methods for estimating the technical costs of external beam radiation therapy

    International Nuclear Information System (INIS)

    Hayman, James A.; Lash, Kathy A.; Tao, May L.; Halman, Marc A.

    2000-01-01

    Purpose: To accurately assess the cost-effectiveness of treatment with external beam radiation, it is necessary to have accurate estimates of its cost. One of the most common methods for estimating technical costs has been to convert Medicare charges into costs using Medicare Cost-to-Charge Ratios (CCR). More recently, health care organizations have begun to invest in sophisticated cost-accounting systems (CAS) that are capable of providing procedure-specific cost estimates. The purpose of this study was to examine whether these competing approaches result in similar cost estimates for four typical courses of external beam radiation therapy (EBRT). Methods and Materials: Technical costs were estimated for the following treatment courses: 1) a palliative 'simple' course of 10 fractions using a single field without blocks; 2) a palliative 'complex' course of 10 fractions using two opposed fields with custom blocks; 3) a curative course of 30 fractions for breast cancer using tangent fields followed by an electron beam boost; and 4) a curative course of 35 fractions for prostate cancer using CT-planning and a 4-field technique. Costs were estimated using the CCR approach by multiplying the number of units of each procedure billed by its Medicare charge and CCR and then summing these costs. Procedure-specific cost estimates were obtained from a cost-accounting system, and overall costs were then estimated for the CAS approach by multiplying the number of units billed by the appropriate unit cost estimate and then summing these costs. All costs were estimated using data from 1997. The analysis was also repeated using data from another academic institution to estimate their costs using the CCR and CAS methods, as well as the appropriate relative value units (RVUs) and conversion factor from the 1997 Medicare Fee Schedule to estimate Medicare reimbursement for the four treatment courses. Results: The estimated technical costs for the CCR vs. CAS approaches for the four

  13. Comparative life cycle assessment and life cycle costing of four disposal scenarios for used polyethylene terephthalate bottles in Mauritius.

    Science.gov (United States)

    Foolmaun, Rajendra Kumar; Ramjeeawon, Toolseeram

    2012-09-01

    The annual rise in population growth coupled with the flourishing tourism industry in Mauritius has lead to a considerable increase in the amount of solid waste generated. In parallel, the disposal of non-biodegradable wastes, especially plastic packaging and plastic bottles, has also shown a steady rise. Improper disposal of used polyethylene terephthalate (PET) bottles constitutes an eyesore to the environmental landscape and is a threat to the flourishing tourism industry. It is of utmost importance, therefore, to determine a suitable disposal method for used PET bottles which is not only environmentally efficient but is also cost effective. This study investigated the environmental impacts and the cost effectiveness of four selected disposal alternatives for used PET bottles in Mauritius. The four disposal routes investigated were: 100% landfilling; 75% incineration with energy recovery and 25% landfilling; 40% flake production (partial recycling) and 60% landfilling; and 75% flake production and 25% landfilling. Environmental impacts of the disposal alternatives were determined using ISO standardized life cycle assessment (LCA) and with the support of SimaPro 7.1 software. Cost effectiveness was determined using life cycle costing (LCC). Collected data were entered into a constructed Excel-based model to calculate the different cost categories, Net present values, damage costs and payback periods. LCA and LCC results indicated that 75% flake production and 25% landfilling was the most environmentally efficient and cost-effective disposal route for used PET bottles in Mauritius.

  14. The effect of life-cycle cost disclosure on consumer behavior. Evidence from a field experiment with cooling appliances

    Energy Technology Data Exchange (ETDEWEB)

    Deutsch, M. [Prognos AG, Goethestr. 85, 10623 Berlin (Germany)

    2010-11-15

    Theory suggests that providing consumers with an estimated life-cycle cost (LCC) may make them buy more energy-efficient household appliances in cases where energy efficiency is cost effective. This article evaluates the link between the provision of LCC and consumer behavior by using an online field experiment for cooling appliances. Internet users arriving at a commercially operating price comparison website were randomly assigned to two experimental groups, and the groups were exposed to different visual stimuli. The control group received regular product price information, whereas the treatment group was offered additional information about estimated operating cost and total LCC. Consumers' click behavior was evaluated with multiple regression controlling for several product characteristics (n=1,969 clicks). We find that LCC disclosure reduces the mean specific energy use of chosen cooling appliances by 2.5% (p<0.01), making it a potentially interesting approach for environmental policy regarding the market transformation toward more energy-efficient household appliances. However, LCC disclosure also decreases the number of clicks from the price comparison website to final retailers by about 23% (p<0.01), which makes it - in the format chosen here - undesirable from a business perspective. Therefore, future research should clarify under what (if any) conditions can monetary energy cost disclosure be associated with more positive effects for price comparison websites.

  15. Top-down and bottom-up approaches for cost estimating new reactor designs

    International Nuclear Information System (INIS)

    Berbey, P.; Gautier, G.M.; Duflo, D.; Rouyer, J.L.

    2007-01-01

    For several years, Generation-4 designs will be 'pre-conceptual' for the less mature concepts and 'preliminary' for the more mature concepts. In this situation, appropriate data for some of the plant systems may be lacking to develop a bottom-up cost estimate. Therefore, a more global approach, the Top-Down Approach (TDA), is needed to help the designers and decision makers in comparing design options. It utilizes more or less simple models for cost estimating the different parts of a design. TDA cost estimating effort applies to a whole functional element whose cost is approached by similar estimations coming from existing data, ratios and models, for a given range of variation of parameters. Modeling is used when direct analogy is not possible. There are two types of models, global and specific ones. Global models are applied to cost modules related to Code Of Account. Exponential formulae such as Ci = Ai + (Bi x Pi n ) are used when there are cost data for comparable modules in nuclear or other industries. Specific cost models are developed for major specific components of the plant: - process equipment such as reactor vessel, steam generators or large heat exchangers. - buildings, with formulae estimating the construction cost from base cost of m3 of building volume. - systems, when unit costs, cost ratios and models are used, depending on the level of detail of the design. Bottom Up Approach (BUA), which is based on unit prices coming from similar equipment or from manufacturer consulting, is very valuable and gives better cost estimations than TDA when it can be applied, that is at a rather late stage of the design. Both approaches are complementary when some parts of the design are detailed enough to be estimated by BUA, and when BUA results are used to check TDA results and to improve TDA models. This methodology is applied to the HTR (High Temperature Reactor) concept and to an advanced PWR design

  16. Externalities of fuel cycles 'ExternE' project. Natural gas fuel cycle. Estimation of physical impacts and monetary valuation for priority impact pathways

    International Nuclear Information System (INIS)

    Holland, M.; Watkiss, P.; Berry, J.; Johnson, C.; Lee, D.

    1994-01-01

    been established. Earlier work is typically of a preliminary nature and tends to be deficient with respect to both the methods employed and the quality of models and data used. In consequence of this the ExternE Project was established in 1991, with the following main objectives; 1) To identify and develop a suitable methodology with which to quantify the external costs and benefits of the major fuel cycles for electricity generation and conservation, using the best available models and data. This to be done using a common framework for assessment of different fuel cycles, in order that fair comparison can be made between them. 2) To use this methodology to assess the external costs for a number of case studies representative of each fuel cycle. 3) To make recommendations on areas in which further research is required in order that future estimates of damages can be made with greater confidence. To meet these objectives we have stressed transparency, consistency and comprehensiveness as guiding principles for the work. This applies particularly to the methods used, definition of study boundaries and listing of effects that are considered and those that are not. These principles are essential to allow valid comparison to be made between different fuel cycles, for which priority impacts may differ greatly, as illustrated by comparison of the gas, nuclear and wind fuel cycles. The present report is one of a series covering the following fuel cycles; coal, uranium, lignite, oil, gas, wind, photovoltaics, biomass and small scale hydroelectric projects. Energy security and energy conservation are also being considered within a similar framework. The methodology used is broadly similar to that identified for Life Cycle Analysis (LCA) by The Society for Environmental Toxicology and Chemistry. It is split into the following stages; 1) Definition of objectives and system boundaries; 2) Collation of an inventory of burdens associated with the process in question; 3

  17. Final report on cost estimate of forward superconducting air core toroid

    International Nuclear Information System (INIS)

    Fields, T.

    1992-12-01

    An independent cost-estimate for key components of the forward superconducting air core toroid (ACT) was obtained in May 1992 from an experienced manufacturer of large cryogenic vessels. This new cost estimate is summarized in this report. It implies that a suitably designed ACT may have a cost which is approximately equal to that of the presently designed SDC forward iron core toroid

  18. Fusion reactor design studies: standard accounts for cost estimates

    International Nuclear Information System (INIS)

    Schulte, S.C.; Willke, T.L.; Young, J.R.

    1978-05-01

    The fusion reactor design studies--standard accounts for cost estimates provides a common format from which to assess the economic character of magnetically confined fusion reactor design concepts. The format will aid designers in the preparation of design concept costs estimates and also provide policymakers with a tool to assist in appraising which design concept may be economically promising. The format sets forth a categorization and accounting procedure to be used when estimating fusion reactor busbar energy cost that can be easily and consistently applied. Reasons for developing the procedure, explanations of the procedure, justifications for assumptions made in the procedure, and the applicability of the procedure are described in this document. Adherence to the format when evaluating prospective fusion reactor design concepts will result in the identification of the more promising design concepts thus enabling the fusion power alternatives with better economic potential to be quickly and efficiently developed

  19. A new look at nuclear power costs

    International Nuclear Information System (INIS)

    Krymm, R.

    1976-01-01

    The evaluation compares estimates for capital costs and fuel cycle costs so as to deduce from estimates of earlier years and from a cost situation which has altered in the meantime, trends for the future. Despite a continuing upward movement of costs, nuclear energy still has a marked advantage over other energy carriers as far as the costs are concerned. However, this alone is not enough anymore to drive nuclear development on, because, in the meantime other, non-economic, factors influence the development. (UA) [de

  20. Nuclear power generation cost methodology

    International Nuclear Information System (INIS)

    Delene, J.G.; Bowers, H.I.

    1980-08-01

    A simplified calculational procedure for the estimation of nuclear power generation cost is outlined. The report contains a discussion of the various components of power generation cost and basic equations for calculating that cost. An example calculation is given. The basis of the fixed-charge rate, the derivation of the levelized fuel cycle cost equation, and the heavy water charge rate are included as appendixes

  1. Fuel economy and life-cycle cost analysis of a fuel cell hybrid vehicle

    Science.gov (United States)

    Jeong, Kwi Seong; Oh, Byeong Soo

    The most promising vehicle engine that can overcome the problem of present internal combustion is the hydrogen fuel cell. Fuel cells are devices that change chemical energy directly into electrical energy without combustion. Pure fuel cell vehicles and fuel cell hybrid vehicles (i.e. a combination of fuel cell and battery) as energy sources are studied. Considerations of efficiency, fuel economy, and the characteristics of power output in hybridization of fuel cell vehicle are necessary. In the case of Federal Urban Driving Schedule (FUDS) cycle simulation, hybridization is more efficient than a pure fuel cell vehicle. The reason is that it is possible to capture regenerative braking energy and to operate the fuel cell system within a more efficient range by using battery. Life-cycle cost is largely affected by the fuel cell size, fuel cell cost, and hydrogen cost. When the cost of fuel cell is high, hybridization is profitable, but when the cost of fuel cell is less than 400 US$/kW, a pure fuel cell vehicle is more profitable.

  2. Development of Cost Estimation Methodology of Decommissioning for PWR

    International Nuclear Information System (INIS)

    Lee, Sang Il; Yoo, Yeon Jae; Lim, Yong Kyu; Chang, Hyeon Sik; Song, Geun Ho

    2013-01-01

    The permanent closure of nuclear power plant should be conducted with the strict laws and the profound planning including the cost and schedule estimation because the plant is very contaminated with the radioactivity. In Korea, there are two types of the nuclear power plant. One is the pressurized light water reactor (PWR) and the other is the pressurized heavy water reactor (PHWR) called as CANDU reactor. Also, the 50% of the operating nuclear power plant in Korea is the PWRs which were originally designed by CE (Combustion Engineering). There have been experiences about the decommissioning of Westinghouse type PWR, but are few experiences on that of CE type PWR. Therefore, the purpose of this paper is to develop the cost estimation methodology and evaluate technical level of decommissioning for the application to CE type PWR based on the system engineering technology. The aim of present study is to develop the cost estimation methodology of decommissioning for application to PWR. Through the study, the following conclusions are obtained: · Based on the system engineering, the decommissioning work can be classified as Set, Subset, Task, Subtask and Work cost units. · The Set and Task structure are grouped as 29 Sets and 15 Task s, respectively. · The final result shows the cost and project schedule for the project control and risk management. · The present results are preliminary and should be refined and improved based on the modeling and cost data reflecting available technology and current costs like labor and waste data

  3. Estimation of the cost of large-scale school deworming programmes with benzimidazoles.

    Science.gov (United States)

    Montresor, A; Gabrielli, A F; Diarra, A; Engels, D

    2010-02-01

    This study estimates the cost of distributing benzimidazole tablets in the context of school deworming programmes: we analysed studies reporting the cost of school deworming from seven countries in four WHO regions. The estimated cost for drug procurement to cover one million children (including customs clearance and international transport) is approximately US$20000. The estimated financial costs (including the cost of training of personnel, drug transport, social mobilization and monitoring) is, on average, equivalent to US$33000 per million school-age children with minimal variation in different countries and continents. The estimated economic costs of distribution (including the time spent by teachers, and health personnel at central, provincial and district level) to cover one million children approximately corresponds to US$19000. This study shows the minimal cost of school deworming activities, but also shows the significant contribution (corresponding to a quarter of the entire cost of the programme) provided by health and education systems in endemic countries even in the case of drug donations and donor support of distribution costs. Copyright 2009 Royal Society of Tropical Medicine and Hygiene. Published by Elsevier Ltd. All rights reserved.

  4. A practical approach for calculating reliable cost estimates from observational data: application to cost analyses in maternal and child health.

    Science.gov (United States)

    Salemi, Jason L; Comins, Meg M; Chandler, Kristen; Mogos, Mulubrhan F; Salihu, Hamisu M

    2013-08-01

    Comparative effectiveness research (CER) and cost-effectiveness analysis are valuable tools for informing health policy and clinical care decisions. Despite the increased availability of rich observational databases with economic measures, few researchers have the skills needed to conduct valid and reliable cost analyses for CER. The objectives of this paper are to (i) describe a practical approach for calculating cost estimates from hospital charges in discharge data using publicly available hospital cost reports, and (ii) assess the impact of using different methods for cost estimation in maternal and child health (MCH) studies by conducting economic analyses on gestational diabetes (GDM) and pre-pregnancy overweight/obesity. In Florida, we have constructed a clinically enhanced, longitudinal, encounter-level MCH database covering over 2.3 million infants (and their mothers) born alive from 1998 to 2009. Using this as a template, we describe a detailed methodology to use publicly available data to calculate hospital-wide and department-specific cost-to-charge ratios (CCRs), link them to the master database, and convert reported hospital charges to refined cost estimates. We then conduct an economic analysis as a case study on women by GDM and pre-pregnancy body mass index (BMI) status to compare the impact of using different methods on cost estimation. Over 60 % of inpatient charges for birth hospitalizations came from the nursery/labor/delivery units, which have very different cost-to-charge markups (CCR = 0.70) than the commonly substituted hospital average (CCR = 0.29). Using estimated mean, per-person maternal hospitalization costs for women with GDM as an example, unadjusted charges ($US14,696) grossly overestimated actual cost, compared with hospital-wide ($US3,498) and department-level ($US4,986) CCR adjustments. However, the refined cost estimation method, although more accurate, did not alter our conclusions that infant/maternal hospitalization costs

  5. Feasibility of perpetual pavement stage construction in China: A life cycle cost analysis

    Directory of Open Access Journals (Sweden)

    Zhongyin Guo

    2016-12-01

    Full Text Available The main objective of pavement design and management is to build sustainable pavement structure with minimum costs during its whole life. There are many uncertainties in the process of pavement design pertaining many of its variables, such as future traffic estimation, long time behavior of materials, future weights and types of traveling vehicles, availability of funds etc. Therefore, it is important to apply pavement stage construction technique during the process of pavement design and management to minimize the risk associated with these uncertainties. From the beginning of 2000, the research and application of perpetual asphalt pavement (PP technology has been deployed in China. The semi rigid base for asphalt pavement has been normally considered as typical component of high class highways in the design according to the Chinese experience since 1997. The research objective is to apply pavement stage construction for the evaluation of life cycle costs of Chinese perpetual and traditional semi rigid pavements using operational pavement management system in addition to examine its suitability for design and construction of more economical and durable flexible pavements. It has been found that the stage construction of asphalt layers in PP over semi rigid pavement foundation will create more sustainable and trusted pavement structures in spite of 2–5% increase in present total cost.

  6. Estimating the cost of cervical cancer screening in five developing countries

    Directory of Open Access Journals (Sweden)

    Goldie Sue J

    2006-08-01

    Full Text Available Abstract Background Cost-effectiveness analyses (CEAs can provide useful information to policymakers concerned with the broad allocation of resources as well as to local decision makers choosing between different options for reducing the burden from a single disease. For the latter, it is important to use country-specific data when possible and to represent cost differences between countries that might make one strategy more or less attractive than another strategy locally. As part of a CEA of cervical cancer screening in five developing countries, we supplemented limited primary cost data by developing other estimation techniques for direct medical and non-medical costs associated with alternative screening approaches using one of three initial screening tests: simple visual screening, HPV DNA testing, and cervical cytology. Here, we report estimation methods and results for three cost areas in which data were lacking. Methods To supplement direct medical costs, including staff, supplies, and equipment depreciation using country-specific data, we used alternative techniques to quantify cervical cytology and HPV DNA laboratory sample processing costs. We used a detailed quantity and price approach whose face validity was compared to an adaptation of a US laboratory estimation methodology. This methodology was also used to project annual sample processing capacities for each laboratory type. The cost of sample transport from the clinic to the laboratory was estimated using spatial models. A plausible range of the cost of patient time spent seeking and receiving screening was estimated using only formal sector employment and wages as well as using both formal and informal sector participation and country-specific minimum wages. Data sources included primary data from country-specific studies, international databases, international prices, and expert opinion. Costs were standardized to year 2000 international dollars using inflation adjustment and

  7. Spreadsheet tool for estimating noise reduction costs

    International Nuclear Information System (INIS)

    Frank, L.; Senden, V.; Leszczynski, Y.

    2009-01-01

    The Northeast Capital Industrial Association (NCIA) represents industry in Alberta's industrial heartland. The organization is in the process of developing a regional noise management plan (RNMP) for their member companies. The RNMP includes the development of a noise reduction cost spreadsheet tool to conduct reviews of practical noise control treatments available for individual plant equipment, inclusive of ranges of noise attenuation achievable, which produces a budgetary prediction of the installed cost of practical noise control treatments. This paper discussed the noise reduction cost spreadsheet tool, with particular reference to noise control best practices approaches and spreadsheet tool development such as prerequisite, assembling data required, approach, and unit pricing database. Use and optimization of the noise reduction cost spreadsheet tool was also discussed. It was concluded that the noise reduction cost spreadsheet tool is an easy interactive tool to estimate implementation costs related to different strategies and options of noise control mitigating measures and was very helpful in gaining insight for noise control planning purposes. 2 tabs.

  8. A non-stationary cost-benefit analysis approach for extreme flood estimation to explore the nexus of 'Risk, Cost and Non-stationarity'

    Science.gov (United States)

    Qi, Wei

    2017-11-01

    Cost-benefit analysis is commonly used for engineering planning and design problems in practice. However, previous cost-benefit based design flood estimation is based on stationary assumption. This study develops a non-stationary cost-benefit based design flood estimation approach. This approach integrates a non-stationary probability distribution function into cost-benefit analysis, and influence of non-stationarity on expected total cost (including flood damage and construction costs) and design flood estimation can be quantified. To facilitate design flood selections, a 'Risk-Cost' analysis approach is developed, which reveals the nexus of extreme flood risk, expected total cost and design life periods. Two basins, with 54-year and 104-year flood data respectively, are utilized to illustrate the application. It is found that the developed approach can effectively reveal changes of expected total cost and extreme floods in different design life periods. In addition, trade-offs are found between extreme flood risk and expected total cost, which reflect increases in cost to mitigate risk. Comparing with stationary approaches which generate only one expected total cost curve and therefore only one design flood estimation, the proposed new approach generate design flood estimation intervals and the 'Risk-Cost' approach selects a design flood value from the intervals based on the trade-offs between extreme flood risk and expected total cost. This study provides a new approach towards a better understanding of the influence of non-stationarity on expected total cost and design floods, and could be beneficial to cost-benefit based non-stationary design flood estimation across the world.

  9. Future regional nuclear fuel cycle cooperation in East Asia: Energy security costs and benefits

    International Nuclear Information System (INIS)

    Hippel, David von; Hayes, Peter; Kang, Jungmin; Katsuta, Tadahiro

    2011-01-01

    Economic growth in East Asia has rapidly increased regional energy, and especially, electricity needs. Many of the countries of East Asia have sought or are seeking to diversify their energy sources and bolster their energy supply and/or environmental security by developing nuclear power. Rapid development of nuclear power in East Asia brings with it concerns regarding nuclear weapons proliferation associated with uranium enrichment and spent nuclear fuel management. This article summarizes the development and analysis of four different scenarios of nuclear fuel cycle management in East Asia, including a scenario where each major nuclear power user develops uranium enrichment and reprocessing of spent fuel individually, scenarios featuring cooperation in the full fuel cycle, and a scenario where reprocessing is avoided in favor of dry cask storage of spent fuel. The material inputs and outputs and costs of key fuel cycle elements under each scenario are summarized. - Highlights: → We evaluate four scenarios of regional nuclear fuel cycle cooperation in East Asia and the Pacific. → The scenarios cover fuel supply, enrichment, transport, reprocessing, and waste management. → We evaluate nuclear material flows, energy use, costs, and qualitative energy security impacts. → Regional cooperation on nuclear fuel cycle issues can help to enhance energy security. → A regional scenario in which reprocessing is rapidly phased out shows security and cost advantages.

  10. Fuel Cycle of VVER-1000: technical and economic aspects

    International Nuclear Information System (INIS)

    Kosourov, E.; Pavlov, V.; Pavlovichev, A.

    2009-01-01

    The paper contains estimations of dependences of technical and economic characteristics of VVER-1000 fuel cycle on number of charged FAs and their enrichment. In the study following restrictions were used: minimum quantity of loaded fresh FAs is equal 36 FAs, a maximum one - 78 (79) FAs and fuel enrichment is limited by value 4,95 %. The following technical and economic characteristics are discussed: cycle length, average burnup of spent fuel, specific consumption of natural uranium, specific quantity of separative work, annual production of thermal energy, fuel component of electrical energy cost, electricity generation cost. Results of estimations are presented as dependences of researched characteristics on cycle length, quantity of loaded FAs and their enrichments. The presented information allows to show tendencies and ranges of technical and economic characteristics at change of fuel cycle parameters. This information can be useful for definition of the fuel cycle parameters which satisfy the requirements of power system and exploiting organizations. (authors)

  11. Methodology applied by IRSN for nuclear accident cost estimations in France

    International Nuclear Information System (INIS)

    2013-01-01

    This report describes the methodology used by IRSN to estimate the cost of potential nuclear accidents in France. It concerns possible accidents involving pressurized water reactors leading to radioactive releases in the environment. These accidents have been grouped in two accident families called: severe accidents and major accidents. Two model scenarios have been selected to represent each of these families. The report discusses the general methodology of nuclear accident cost estimation. The crucial point is that all cost should be considered: if not, the cost is underestimated which can lead to negative consequences for the value attributed to safety and for crisis preparation. As a result, the overall cost comprises many components: the most well-known is offsite radiological costs, but there are many others. The proposed estimates have thus required using a diversity of methods which are described in this report. Figures are presented at the end of this report. Among other things, they show that purely radiological costs only represent a non-dominant part of foreseeable economic consequences

  12. Equilibrium transuranic management scheme for diverse fuel cycle analysis

    International Nuclear Information System (INIS)

    Haas, Jason; Lee, John C.

    2008-01-01

    A key issue cited in the U.S. Department of Energy's report to Congress (2003) on the research path for the Advanced Fuel Cycle Initiative (AFCI) is an accurate estimation of life cycle costs for the construction, operation, decontamination and decommissioning of all fuel cycle facilities. In this report we discuss the methodology and validation of a fuel cycle model based on equilibrium operation. We apply our model to a diverse set of advanced reactors and fuel types in order to determine the most effective transmuting system while simultaneously minimizing fuel cycle costs. Our analysis shows that a nearly instant equilibrium modeling of fuel cycle scenarios can accurately approximate the detailed complex dynamic models developed by national laboratories. Our analysis also shows that the cost of transmuting Spent Nuclear Fuel (SNF) from a UO 2 fueled Pressurized Water Reactor (PWR) is minimized by utilizing the thorium cycle in sodium cooled fast reactors and is near the cost for long term repository storage of SNF at Yucca Mountain. (authors)

  13. Estimated incremental costs for NRC licensees to implement the US/IAEA safeguards agreement

    International Nuclear Information System (INIS)

    Clark, R.G.; Brouns, R.J.; Chockie, A.D.; Davenport, L.C.; Merrill, J.A.

    1979-01-01

    A study was recently completed for the US Nuclear Regulatory Commision (NRC) by the Pacific Northwest Laboratory (PNL) to identify the incremental cost of implementing the US/IAEA safeguards treaty agreement to eligible NRC licensees. Sources for the study were cost estimates from several licensees who will be affected by the agreement and cost analyses by PNL staff. The initial cost to all eligible licensees to implement the agreement is estimated by PNL to range from $1.9 to $7.2 million. The annual cost to these same licensees for the required accounting and reporting activities is estimated at $0.5 to $1.5 million. Annual inspection costs to the industry for the limited IAEA inspection being assumed is estimated at $80,000 to $160,000

  14. Modified natural cycle versus controlled ovarian hyperstimulation IVF: a cost-effectiveness evaluation of three simulated treatment scenarios

    NARCIS (Netherlands)

    Groen, Henk; Tonch, Nino; Simons, Arnold H. M.; van der Veen, Fulco; Hoek, Annemieke; Land, Jolande A.

    2013-01-01

    Can modified natural cycle IVF or ICSI (MNC) be a cost-effective alternative for controlled ovarian hyperstimulation IVF or ICSI (COH)? The comparison of simulated scenarios indicates that a strategy of three to six cycles of MNC with minimized medication is a cost-effective alternative for one

  15. Method for Controlling Space Transportation System Life Cycle Costs

    Science.gov (United States)

    McCleskey, Carey M.; Bartine, David E.

    2006-01-01

    A structured, disciplined methodology is required to control major cost-influencing metrics of space transportation systems during design and continuing through the test and operations phases. This paper proposes controlling key space system design metrics that specifically influence life cycle costs. These are inclusive of flight and ground operations, test, and manufacturing and infrastructure. The proposed technique builds on today's configuration and mass properties control techniques and takes on all the characteristics of a classical control system. While the paper does not lay out a complete math model, key elements of the proposed methodology are explored and explained with both historical and contemporary examples. Finally, the paper encourages modular design approaches and technology investments compatible with the proposed method.

  16. Planning Costs in Certain Stage of the Life Cycle of Investment Activity of Construction Organization

    Directory of Open Access Journals (Sweden)

    Iakymchuk Iryna M.

    2017-09-01

    Full Text Available The article discusses the issues related to planning costs in certain stages of the life-cycle of investment activity of construction organization. It has been specified that cost management based on the life-cycle model of the investment project, which is being implemented by a construction organization, allows for a consistent improvement in the efficiency of the innovation process on the basis of a clear planning, as well as cost forecasting. This approach allows for the long-term effectiveness of innovation project by providing cost-management services at all stages of investment project, identifying opportunities for reducing them, thereby contributing to sustainable development of construction organization over time. It has been concluded that the more specific the program of activities of construction organization, the more accurate the process of identification of costs becomes, the more efficient is the management of costs, targeted at saving resources, reducing the self cost of construction works.

  17. Estimated annual cost of arterial hypertension treatment in Brazil.

    Science.gov (United States)

    Dib, Murilo W; Riera, Rachel; Ferraz, Marcos B

    2010-02-01

    To estimate the direct annual cost of systemic arterial hypertension (SAH) treatment in Brazil's public and private health care systems, assess its economic impact on the total health care budget, and determine its proportion of the 2005 gross domestic product (GDP). A decision tree model was used to determine direct costs based on estimated use of various resources in SAH diagnosis and care, including treatment (medication and non-medication), complementary exams, doctor visits, nutritional assessments, and emergency room visits. Estimated direct annual cost of SAH treatment was approximately US$ 398.9 million for the public health care system and US$ 272.7 million for the private system, representing 0.08% of the 2005 GDP (ranging from 0.05% to 0.16%). With total health care expenses comprising about 7.6% of Brazil's GDP, this cost represented 1.11% of overall health care costs (0.62% to 2.06%)-1.43% of total expenses for the Unified Healthcare System (Sistema Unico de Saúde, SUS) (0.79% to 2.75%) and 0.83% of expenses for the private health care system (0.47% to 1.48%). Conclusion. To guarantee public or private health care based on the principles of universality and equality, with limited available resources, efforts must be focused on educating the population on prevention and treatment compliance in diseases such as SAH that require significant health resources.

  18. The cost of universal health care in India: a model based estimate.

    Science.gov (United States)

    Prinja, Shankar; Bahuguna, Pankaj; Pinto, Andrew D; Sharma, Atul; Bharaj, Gursimer; Kumar, Vishal; Tripathy, Jaya Prasad; Kaur, Manmeet; Kumar, Rajesh

    2012-01-01

    As high out-of-pocket healthcare expenses pose heavy financial burden on the families, Government of India is considering a variety of financing and delivery options to universalize health care services. Hence, an estimate of the cost of delivering universal health care services is needed. We developed a model to estimate recurrent and annual costs for providing health services through a mix of public and private providers in Chandigarh located in northern India. Necessary health services required to deliver good quality care were defined by the Indian Public Health Standards. National Sample Survey data was utilized to estimate disease burden. In addition, morbidity and treatment data was collected from two secondary and two tertiary care hospitals. The unit cost of treatment was estimated from the published literature. For diseases where data on treatment cost was not available, we collected data on standard treatment protocols and cost of care from local health providers. We estimate that the cost of universal health care delivery through the existing mix of public and private health institutions would be INR 1713 (USD 38, 95%CI USD 18-73) per person per annum in India. This cost would be 24% higher, if branded drugs are used. Extrapolation of these costs to entire country indicates that Indian government needs to spend 3.8% (2.1%-6.8%) of the GDP for universalizing health care services. The cost of universal health care delivered through a combination of public and private providers is estimated to be INR 1713 per capita per year in India. Important issues such as delivery strategy for ensuring quality, reducing inequities in access, and managing the growth of health care demand need be explored.

  19. Bevacizumab in Treatment of High-Risk Ovarian Cancer—A Cost-Effectiveness Analysis

    Science.gov (United States)

    Herzog, Thomas J.; Hu, Lilian; Monk, Bradley J.; Kiet, Tuyen; Blansit, Kevin; Kapp, Daniel S.; Yu, Xinhua

    2014-01-01

    Objective. The objective of this study was to evaluate a cost-effectiveness strategy of bevacizumab in a subset of high-risk advanced ovarian cancer patients with survival benefit. Methods. A subset analysis of the International Collaboration on Ovarian Neoplasms 7 trial showed that additions of bevacizumab (B) and maintenance bevacizumab (mB) to paclitaxel (P) and carboplatin (C) improved the overall survival (OS) of high-risk advanced cancer patients. Actual and estimated costs of treatment were determined from Medicare payment. Incremental cost-effectiveness ratio per life-year saved was established. Results. The estimated cost of PC is $535 per cycle; PCB + mB (7.5 mg/kg) is $3,760 per cycle for the first 6 cycles and then $3,225 per cycle for 12 mB cycles. Of 465 high-risk stage IIIC (>1 cm residual) or stage IV patients, the previously reported OS after PC was 28.8 months versus 36.6 months in those who underwent PCB + mB. With an estimated 8-month improvement in OS, the incremental cost-effectiveness ratio of B was $167,771 per life-year saved. Conclusion. In this clinically relevant subset of women with high-risk advanced ovarian cancer with overall survival benefit after bevacizumab, our economic model suggests that the incremental cost of bevacizumab was approximately $170,000. PMID:24721817

  20. U.S. Refinery compliance costs - the elements of and estimate

    International Nuclear Information System (INIS)

    Musgrove, J.G.; Swain, E.J.

    1993-01-01

    A recent National Petroleum Council study identified the environmental costs facing the refining industry from 1995 through 2010. Four broad areas were identified: air pollution control, wastewater treatment, solid and hazardous waste treatment, and occupational health and safety. This paper will present the technical issues and engineering information required to produce an estimate of cost impact. For each of the four areas of impact, the kinds of information required of the refinery manager in order to build an estimate will be tabulated and discussed. For air pollution control, issues will include size and type of unit, product mix of output, and the impact of facility location relative to non-attainment issues. For wastewater, issues will include stormwater segregation, benzene NESHAP, and other treatment system requirements. For hazardous waste treatment, issues will include groundwater protection and leak detection and contaminated soil segregation. For occupational health and safety, issues will include process changes required and worker training required. For all issues, the major dollar factors will be identified as a function of the technical data available. The refinery costs in each areas were estimated for seven groups of refinery sizes. The presentation will conclude with tabulation of cost estimates for each area of investigation and each refinery group. The total costs for each refinery group over the fifteen-year period will also be presented