Sample records for cost overruns

  1. Pro-cyclical petroleum investments and cost overruns in Norway

    International Nuclear Information System (INIS)

    Dahl, Roy Endré; Lorentzen, Sindre; Oglend, Atle; Osmundsen, Petter

    2017-01-01

    Development projects in the oil industry often have cost overruns. Through analysis of data from Norwegian development projects in the petroleum industry, this paper investigates the common effect of business cycle developments on cost overruns. Lack of capacity and expertise in a tight supplier market yield cost inflation and difficulties in managing projects. Unlike previous analyses of cost overruns, we analyze projects over a long time period to capture the cyclical effects. We document a statistically significant positive relationship between oil price developments and cost overruns, and a positive relationship between changes in number of employees in the sector and cost overruns. We also show that surprises to the oil price during the project implementation having a larger impact on cost overruns than the oil price level itself. Cost overrun ultimately leads to reduced competitiveness for the industry, and we discuss consequences and policy implications for business and society of these cost overruns. - Highlights: • Quantitative study of cost overruns in petroleum projects. • Discussion of the business cycle as a common cost overrun driver. • Oil price development has significant positive effect on cost overruns. • Changes in number of employees in the sector has positive effect on cost overruns.

  2. Theoretical framework of the causes of construction time and cost overruns

    Science.gov (United States)

    Ullah, K.; Abdullah, A. H.; Nagapan, S.; Suhoo, S.; Khan, M. S.

    2017-11-01

    Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects.

  3. Categorization of potential project cost overrun factors in construction industry

    Science.gov (United States)

    Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.

    2018-04-01

    Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.

  4. Identifying factors causing cost overrun of the construction projects ...

    Indian Academy of Sciences (India)

    Swapnil P Wanjari

    Cost overrun in India; ANOVA; factor analysis; construction projects. 1. Introduction ... gramme Implementation in India [2], projects of public .... case if a respondent never came across of such factor. ..... The co-relation matrix for variables of cost overruns was ..... There are various problems observed due to communication.

  5. Risk, innovation, electricity infrastructure and construction cost overruns: Testing six hypotheses

    International Nuclear Information System (INIS)

    Sovacool, Benjamin K.; Gilbert, Alex; Nugent, Daniel

    2014-01-01

    This study investigates the frequency and magnitude of cost and time overruns occurring during the construction of 401 electricity projects built between 1936 and 2014 in 57 countries. In aggregate, these projects required approximately $820 billion in investment, and amounted to 325,515 MW of installed capacity and 8495 km of transmission lines. We use this sample of projects to test six hypotheses about construction cost overruns related to (1) diseconomies of scale, (2) project delays, (3) technological learning, (4) regulation and markets, (5) decentralization and modularity, and (6) normalization of results to scale. We find that nuclear reactors are the riskiest technology in terms of mean cost escalation as a percentage of budget and frequency; that hydroelectric dams stand apart for their mean cost escalation in total dollars; that many of the hypotheses grounded in the literature appear wrong; and that financing, partnerships, modularity, and accountability may have more to do with overruns than technology. - Highlights: • Many hypotheses about construction overruns grounded in the literature appear wrong. • Nuclear reactors are the most prone to cost overruns as a percentage of budget and frequency. • Hydroelectric dams stand apart for their mean cost escalation in total dollars. • Solar and wind energy systems are least at risk to cost overruns

  6. Causative factors of cost overrun in highway projects of Sindh province of Pakistan

    Science.gov (United States)

    Sohu, S.; Halid, A.; Nagapan, S.; Fattah, A.; Latif, I.; Ullah, K.

    2017-11-01

    Cost overrun is an increase of cost of project from approved budget which was signed by parties at the time of tender. Cost overrun in construction of highway projects is a common problem worldwide and construction industry of Pakistan is also facing this crucial problem of cost overrun in highway projects of Pakistan. The main objective of this research is to identify the causative factors of cost overrun in highway projects of Sindh province of Pakistan. A well designed questionnaire was developed based on 64 common factors of cost overrun from literature review. Developed questionnaire was distributed among selected 30 experts from owner/client, designer/consultant and contractor who have experience more than 20 years’ experience in highway projects. The collected data was statistical analyzed. After analysis results showed that delay process in payment by client, inadequate planning, client interference, poor contract management, delay of decision making, change of scope of project and financial problems faced by client were most causative factors of cost overrun in highway projects. This research will provide alertness to stakeholders of highway projects of Sindh province to avoid cost overrun in projects.

  7. Policies to Avoid Cost Overruns in Infrastructure Projects: Critical Evaluation and Recommendations

    Directory of Open Access Journals (Sweden)

    Hans Lind

    2014-09-01

    Full Text Available Many infrastructure projects have cost overruns and there has been a lot of research both on why these cost overruns occur and what can be done to reduce hem. Bent Flyvbjerg is the leading researcher in the area and in this article his proposals are used as the starting point. Besides a literature review, a questionnaire was sent out to experienced Swedish project managers to find out what they thought could reduce cost overruns. The literature review and the questionnaire were the foundation for the proposals formulated in this article. Proposals concerned three areas: (1. Organisational macro-structure, e.g. using more PPP projects but also decentralisation of budgets where cost overruns in one project in a region lead to less alternative projects in the specific region. (2. Organisational quality: It should be easy to see when and where cost overruns occur and who was responsible. There should be a well-developed knowledge management system in the organisation and an organisation culture of openness with a focus on improvements. (3. Organisational processes, e.g. a systematic use of external reviewers in different stages of a project.   Keywords: Cost overruns, Infrastructure projects, Policy measures

  8. An investigation into cost overruns for ongoing building projects in ...

    African Journals Online (AJOL)

    of Engineering, the Built. Environment, and .... works; identification of causes of cost overruns, as well as the control measures for .... project; poor project schedules and management; increases in the prices of .... conclusion, the magnitude of the cost overrun was reduced after ..... Research in Business, 3(11), pp. 775-780.

  9. Factors influencing cost over-run in Indian construction projects

    Directory of Open Access Journals (Sweden)

    Cindrela Devi A.

    2017-01-01

    Full Text Available Construction cost is the most important criteria of project success and hence the construction project performance is generally expressed in terms of cost and its variance from the budget. In spite of having extant literature, cost estimation methods, cost indices etc., construction projects rarely meet the budgeted cost. This research study focuses on the construction cost overrun and to identify the various factors that affects the construction cost performance. Based on an extensive literature review and input from industry experts, sixty eight factors that causes cost overrun were identified for investigation. Further, a structured questionnaire survey was conducted among the industry experts and the collected data has been analysed statistically. It is concluded that the factors namely scope creep, construction delays, rework and practise of awarding the contract to the lowest bidder are most significant factors for construction cost overrun in non-infrastructural Indian projects. The relative importance of the listed factors used to guide the project team in addressing the cost related risks involved in the projects. The findings are expected to bridge the gap in the current construction cost management practices.

  10. An investigation into cost overruns for ongoing building projects in ...

    African Journals Online (AJOL)

    The total amount of cost overruns for any construction project can be fully determined once the project is completed. Estimating the amount of cost overruns at different stages of ongoing construction projects is important for project success. There is, however, a dearth of research for this exercise. This article reports the ...

  11. Cost Overrun Optimism: Fact or Fiction

    Science.gov (United States)

    2016-02-29

    Base, OH. Homgren, C. T. (1990). In G. Foster (Ed.), Cost accounting : A managerial emphasis (7th ed.). Englewood Cliffs, NJ: Prentice Hall. Morrison... Accounting Office. Gansler, J. S. (1989). Affording defense. Cambridge, MA: The MIT Press. Heise, S. R. (1991). A review of cost performance index...Image designed by Diane Fleischer Cost Overrun Optimism: FACT or FICTION? Maj David D. Christensen, USAF Program managers are advocates by

  12. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  13. Cost overruns will hit research at CERN

    CERN Multimedia

    Weiss, G

    2002-01-01

    To try and offset cost overruns on the LHC, CERN managers have drafted a preliminary plan that would delay start-up of the accelerator until 2007 and drastically reduces spending on longterm research programmes (1 page).

  14. Applying Interpretive Structural Modeling to Cost Overruns in Construction Projects in the Sultanate of Oman

    Directory of Open Access Journals (Sweden)

    K. Alzebdeh

    2015-06-01

    Full Text Available Cost overruns in construction projects are a problem faced by project managers, engineers, and clients throughout the Middle East.  Globally, several studies in the literature have focused on identifying the causes of these overruns and used statistical methods to rank them according to their impacts. None of these studies have considered the interactions among these factors. This paper examines interpretive structural modelling (ISM as a viable technique for modelling complex interactions among factors responsible for cost overruns in construction projects in the Sultanate of Oman. In particular, thirteen interrelated factors associated with cost overruns were identified, along with their contextual interrelationships. Application of ISM leads to organizing these factors in a hierarchical structure which effectively demonstrates their interactions in a simple way. Four factors were found to be at the root of cost overruns: instability of the US dollar, changes in governmental regulations, faulty cost estimation, and poor coordination among projects’ parties. Taking appropriate actions to minimize the influence of these factors can ultimately lead to better control of future project costs. Thisstudy is of value to managers and decision makers because it provides a powerful yet very easy to apply approach for investigating the problem of cost overruns and other similar issues.

  15. Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan

    Science.gov (United States)

    Sohu, Samiullah; Abdullah, Abd Halid; Nagapan, Sasitharan; Fattah, Abdul; Ullah, Kaleem; Kumar, Kanesh

    2017-10-01

    Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.

  16. Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang

    Science.gov (United States)

    Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad

    2018-04-01

    Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.

  17. A post-contract project analysis of material waste and cost overrun ...

    African Journals Online (AJOL)

    In Malaysia, 28.34% of the total waste sent to landfills originates from ..... by comparing the opinions of the first two interviewees. The process continued .... the causes of delay and cost overrun in Uganda's public sector construction projects.

  18. Cost Overruns in Large-scale Transportation Infrastructure Projects

    DEFF Research Database (Denmark)

    Cantarelli, Chantal C; Flyvbjerg, Bent; Molin, Eric J. E

    2010-01-01

    is also considered possible. Non-political explanations are diverse in character, therefore a range of different theories (including rational choice theory and prospect theory), depending on the kind of explanation is considered more appropriate than one all-embracing theory........ Overall, four categories of explanations can be distinguished: technical, economic, psychological, and political. Political explanations have been seen to be the most dominant explanations for cost overruns. Agency theory is considered the most interesting for political explanations and an eclectic theory...

  19. A post-contract project analysis of material waste and cost overrun ...

    African Journals Online (AJOL)

    Material waste and cost overrun have been identified as common problems in the construction industry. These problems occur at both pre- and post-contract stages of a construction project. As a result of a dearth of empirical research and low level of awareness, the majority of managers of construction projects in Nigeria ...

  20. Cost Overruns in Large-Scale Transport Infrastructure Projects : A theoretical and empirical exploration for the Netherlands and worldwide

    NARCIS (Netherlands)

    Cantarelli, C.C.

    2011-01-01

    In the Netherlands, the costs of railroad infrastructure construction work out 11 per cent higher than forecast; the percentage for roads is 19 and 22 for bridges and tunnels. While this puts the Netherlands in a favourable light compared to other countries, the actual cost overruns are probably far

  1. Using Multiple and Logistic Regression to Estimate the Median WillCost and Probability of Cost and Schedule Overrun for Program Managers

    Science.gov (United States)

    2017-03-23

    Logistic Regression to Estimate the Median Will-Cost and Probability of Cost and Schedule Overrun for Program Managers Ryan C. Trudelle, B.S...not the other. We are able to give logistic regression models to program managers that identify several program characteristics for either...considered acceptable. We recommend the use of our logistic models as a tool to manage a portfolio of programs in order to gain potential elusive

  2. Study of relationship between time overrun and productivity on construction sites

    Directory of Open Access Journals (Sweden)

    Ameh, Oko John

    2011-12-01

    Full Text Available The history of the construction industry worldwide is full of projects that were completed with significant time and cost overruns. In an attempt to reverse this trend, this study aims at establishing the relationship between time overrun and labour productivity on construction sites in Lagos, Nigeria. 43 technical and management staff of some medium and large construction firms based in Lagos, Nigeria were sampled and administered a questionnaire survey. The questionnaire contained 18 causes of project time overrun and 14 causes of low labour productivity which had been identified from the literature reviewed. With these a relationship between project time overrun and low labour productivity was established. Both descriptive and inferential statistics were used in analyzing the data. Results indicate that inadequate funds for the project, inadequate planning before project takeoff, inadequate tools and equipment and delay in delivery of material top the list of major causes of time overrun while the use of wrong construction methods, inadequate construction materials and inaccurate drawing/specification are the key factors causing low labour productivity on construction sites. Significant negative relationship was found between time overrun and labour productivity in construction sites in Nigeria. The study concludes by recommending that early appointment of project managers could ensure proper management of both the human and material resources that could guarantee improved productivity and ultimately save projects from time overrun.

  3. Development of econometric models for cost and time over-runs: an empirical study of major road construction projects in pakistan

    International Nuclear Information System (INIS)

    Khan, A.; Chaudhary, M.A.

    2016-01-01

    The construction industry is flourishing worldwide and contributes about 10% to the GDP of the world i.e. up to the tune of 4.6 Trillion US dollars. It employs almost 7% of the total employee dpersons and, consumes around 40% of the total energy. The Pakistani construction sector has displayed impressive growth in recent past years. The efficient road network is a key part of construction business and plays a significant role in the economic uplift of country. The overruns in costs and delays in completion of projects are very common phenomena and it has also been observed that the projects involving construction of roads also face problems of delays and cost over runs especially in developing countries. The causes of cost overruns and delays in road projects being undertaken by the premier road construction organization of Pakistan National Highway Authority (NHA) have been considered in this study. It has been done specifically in the context of impact of cause(s) determined from project report of a total of one hundred and thirty one (131) projects. The ten causative factors which we recognize as Design, Planning and Scheduling Related problems, Financial Constraint Related reasons, Social Problem Related reasons, Technical Reasons, Administrative Reasons, Scope Increase, Specification Changes, Cost Escalation Related reasons, Non-Availability of Equipment or Material and Force Majeure play a commanding role in determination of the cost and time over runs. It has also been observed that among these identified causes, the factors of Administrative Reason, Design, Planning and Scheduling Related, Technical Reasons and Force Majeure are the most significant reasons in cost and time overruns. Whereas, the Cost Escalation related reasons has the least impact on cost increase and delays. The NHA possesses a financial worth of around Rs. 36 billion and with an annual turn over amounting to Rs. 22 billion is responsible to perform road construction project in entire

  4. Time Overrun in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face huge amount of time overrun. This study assesses the causes of construction projects time overrun in Malaysia using structured questionnaire survey. Each respondent is asked to assign a one-to-five rating for each of the 18 time factors identified from literature review. Out of the 50 questionnaires sent out, 33 were received back representing 68% of the response rate. Data received from the questionnaires were analysed and processed using the descriptive statistics procedures. Findings from the study revealed that design and documentation issues, project management and contract administration, ineffective project planning and scheduling, contractor’s site management, financial resource management were the major factors that cause the time overrun. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.

  5. Proper project planning helps minimize overruns and delays

    International Nuclear Information System (INIS)

    Donnelly, G.; Cooney, D.J.

    1994-01-01

    This paper describes planning methods to help minimize cost overruns during the construction of oil and gas pipelines. These steps include background data collection methods, field surveys, determining preliminary pipeline routes, regulatory agency pre-application meetings, and preliminary engineering. Methods for planning also include preliminary aerial mapping, biological assessments, cultural resources investigations, wetlands delineation, geotechnical investigations, and environmental audits. Identification of potential problems can allow for rerouting of the pipeline or remediation processes before they are raised during the permitting process. By coordinating these events from the very beginning, significant cost savings will result that prevent having to rebudget for them after the permitting process starts

  6. Dynamic Cost-Contingency Management: A Method for Reducing Project Costs While Increasing the Probability of Success

    National Research Council Canada - National Science Library

    Kujawski, Edouard

    2007-01-01

    In the real world, "Money Allocated is Money Spent" (MAIMS). As a consequence, cost underruns are rarely available to protect against cost overruns, while task overruns are passed on to the total project cost...

  7. Identifying The Effective Factors for Cost Overrun and Time Delay in Water Construction Projects

    Directory of Open Access Journals (Sweden)

    D. Mirzai Matin

    2016-08-01

    Full Text Available Water construction projects in Iran frequently face problems which cause cost overrun and time delay, the two most common issues in construction projects in general. The objective of this survey is to identify and quantify these problems and thus help in avoiding them. This survey represents a collection of the most significant problems found in the literature, classified into 11 groups according to their source. The questionnaire form used contains 84 questions which were answered by random engineers who work in water construction projects. The Relative Importance Weight (RIW method is used to weight the importance of each one of the 84 problems. The focus of this survey is on overall top ten issues which are: bureaucracy in bidding method, inflation, economical condition of the government, not enough information gathered and surveys done before design, monthly payment difficulties, material cost changes, law changes by the government, financial difficulties, mode of financing and payment for completed work and changes made by the owner. A section for each of these issues provides additional information about them. In the full text of this survey the same weighting method is used to classify the main groups, and the results show that issues related to the groups of government, owner and consultant has the most significant impact. The last part of this survey describes the point of view of the engineers who took part in this survey and the recommendations they made.

  8. 23 CFR 635.127 - Agreement provisions regarding overruns in contract time.

    Science.gov (United States)

    2010-04-01

    ... ENGINEERING AND TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.127 Agreement provisions regarding overruns in contract time. (a) Each State transportation department (STD) shall... 23 Highways 1 2010-04-01 2010-04-01 false Agreement provisions regarding overruns in contract time...

  9. Common risks affecting time overrun in road construction projects in Palestine: Contractors’ perspective

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2013-06-01

    Full Text Available The construction sector is one of the key economic sectors and is the main force motivating the Palestinian national economy. However, it suffers from number of problems that affect time, cost and quality performances. This study aims at identifying the common risks affecting time overrun in road construction projects in the West Bank in Palestine from contractors’ viewpoint. 45 factors that might cause delays of road construction projects were defined through a detailed literature review. A questionnaire survey was performed to rank the considered factors in terms of severity and frequency. The analysis of the survey indicated that the top risks affecting time overrun in road construction projects in Palestine are: financial status of the contractors, payments delay by the owner, political situation, segmentation of the West Bank, poor communication between construction parties, lack of equipment efficiency, and high competition in bids.

  10. STATUS AND DEVELOPMENT OF RUNWAY OVERRUN PREVENTION SYSTEMS

    OpenAIRE

    A. V. Mozolyako; A. N. Akimov; V. V. Vorobyev

    2014-01-01

    This article describes the current condition of the onboard braking systems while rolling and the approach to the construction of the aircraft automatic braking system. The article analysis the main reasons for RW overrun and measures of reducing the risk.

  11. Improving Life-Cycle Cost Management of Spacecraft Missions

    Science.gov (United States)

    Clardy, Dennon

    2010-01-01

    This presentation will explore the results of a recent NASA Life-Cycle Cost study and how project managers can use the findings and recommendations to improve planning and coordination early in the formulation cycle and avoid common pitfalls resulting in cost overruns. The typical NASA space science mission will exceed both the initial estimated and the confirmed life-cycle costs by the end of the mission. In a fixed-budget environment, these overruns translate to delays in starting or launching future missions, or in the worst case can lead to cancelled missions. Some of these overruns are due to issues outside the control of the project; others are due to the unpredictable problems (unknown unknowns) that can affect any development project. However, a recent study of life-cycle cost growth by the Discovery and New Frontiers Program Office identified a number of areas that are within the scope of project management to address. The study also found that the majority of the underlying causes for cost overruns are embedded in the project approach during the formulation and early design phases, but the actual impacts typically are not experienced until late in the project life cycle. Thus, project management focus in key areas such as integrated schedule development, management structure and contractor communications processes, heritage and technology assumptions, and operations planning, can be used to validate initial cost assumptions and set in place management processes to avoid the common pitfalls resulting in cost overruns.

  12. STATUS AND DEVELOPMENT OF RUNWAY OVERRUN PREVENTION SYSTEMS

    Directory of Open Access Journals (Sweden)

    A. V. Mozolyako

    2014-01-01

    Full Text Available This article describes the current condition of the onboard braking systems while rolling and the approach to the construction of the aircraft automatic braking system. The article analysis the main reasons for RW overrun and measures of reducing the risk.

  13. Evaluating the approach to reduce the overrun cost of grid connected PV systems for the Spanish electricity sector: Performance analysis of the period 2010–2012

    International Nuclear Information System (INIS)

    Hoz, Jordi de la; Martín, Helena; Ballart, Jordi; Monjo, Lluis

    2014-01-01

    Highlights: • The cost of the Spanish PV promotion policy from 1998 to 2008 is formulated. • The range of scenarios for the cost evolution is determined. • The PV legal measures addressed to reduce the cost are formulated. • The savings range for the Spanish electricity sector has been determined. • The profitability loss of the facilities due to cost containment measures is assessed. - Abstract: A methodology for calculating the overrun cost to the Spanish electricity system caused by the large overshoot of the PV power targets under the RD 661/2007 is here presented. The elements influencing the cost have been identified, which has allowed proposing different scenarios for its possible evolution. Applying the same methodology, the range of savings achievable by the new energy policy developed in 2010–2012 to reduce this cost has been quantified. Inverting the point of view, the profitability reduction that these energy measures might have caused on the PV facilities has been also assessed. The conclusions obtained from the case of four specific facilities may give some insight about the general economic effects on the installations of the 2010–2012 new energy policy, and the consequences for the investors when the inadequacies of the regulatory schemes are tried to be corrected ex-post

  14. The Economics of NASA Mission Cost Reserves

    Science.gov (United States)

    Whitley, Sally; Shinn, Stephen

    2012-01-01

    Increases in NASA mission costs are well-noted but not well-understood, and there is little evidence that they are decreasing in frequency or amount over time. The need to control spending has led to analysis of the causes and magnitude of historical mission overruns, and many program control efforts are being implemented to attempt to prevent or mitigate the problem (NPR 7120). However, cost overruns have not abated, and while some direct causes of increased spending may be obvious (requirements creep, launch delays, directed changes, etc.), the underlying impetus to spend past the original budget may be more subtle. Gaining better insight into the causes of cost overruns will help NASA and its contracting organizations to avoid .them. This paper hypothesizes that one cause of NASA mission cost overruns is that the availability of reserves gives project team members an incentive to make decisions and behave in ways that increase costs. We theorize that the presence of reserves is a contributing factor to cost overruns because it causes organizations to use their funds less efficiently or to control spending less effectively. We draw a comparison to the insurance industry concept of moral hazard, the phenomenon that the presence of insurance causes insureds to have more frequent and higher insurance losses, and we attempt to apply actuarial techniques to quantifY the increase in the expected cost of a mission due to the availability of reserves. We create a theoretical model of reserve spending motivation by defining a variable ReserveSpending as a function of total reserves. This function has a positive slope; for every dollar of reserves available, there is a positive probability of spending it. Finally, the function should be concave down; the probability of spending each incremental dollar of reserves decreases progressively. We test the model against available NASA CADRe data by examining missions with reserve dollars initially available and testing whether

  15. Investigation of Overrun-Processed Porous Hyaluronic Acid Carriers in Corneal Endothelial Tissue Engineering.

    Directory of Open Access Journals (Sweden)

    Jui-Yang Lai

    Full Text Available Hyaluronic acid (HA is a linear polysaccharide naturally found in the eye and therefore is one of the most promising biomaterials for corneal endothelial regenerative medicine. This study reports, for the first time, the development of overrun-processed porous HA hydrogels for corneal endothelial cell (CEC sheet transplantation and tissue engineering applications. The hydrogel carriers were characterized to examine their structures and functions. Evaluations of carbodiimide cross-linked air-dried and freeze-dried HA samples were conducted simultaneously for comparison. The results indicated that during the fabrication of freeze-dried HA discs, a technique of introducing gas bubbles in the aqueous biopolymer solutions can be used to enlarge pore structure and prevent dense surface skin formation. Among all the groups studied, the overrun-processed porous HA carriers show the greatest biological stability, the highest freezable water content and glucose permeability, and the minimized adverse effects on ionic pump function of rabbit CECs. After transfer and attachment of bioengineered CEC sheets to the overrun-processed HA hydrogel carriers, the therapeutic efficacy of cell/biopolymer constructs was tested using a rabbit model with corneal endothelial dysfunction. Clinical observations including slit-lamp biomicroscopy, specular microscopy, and corneal thickness measurements showed that the construct implants can regenerate corneal endothelium and restore corneal transparency at 4 weeks postoperatively. Our findings suggest that cell sheet transplantation using overrun-processed porous HA hydrogels offers a new way to reconstruct the posterior corneal surface and improve endothelial tissue function.

  16. Landing Distance Minimization to Prevent Overrun Accidents Using Field Theory and Stabilizing Air Traffic - A Novel Approach

    Science.gov (United States)

    Krishna Kumar, R.; Navaneeth, M.; Shachin Shibi, R.

    2017-09-01

    Airplane is considered to be the pinnacle of engineering as it has proven that it is possible for a manmade object to fly. Before its invention, flying was just a dream for mankind. In such an esteemed domain, landing is the most challenging part and it is where a large number of accidents occur, especially due to overrun. As the name suggests, overrun accidents occur due to insufficient runway length. In the present study, the concept of planar electromagnetic fields is incorporated to minimize the landing distance of an aircraft, thus preventing the overrun accidents. As a result, unexpected losses can be avoided. In addition to this, the stability of air traffic control can be perpetuated and the fuel consumed during loitering time can be diminished.

  17. Effects of Emulsifier, Overrun and Dasher Speed on Ice Cream Microstructure and Melting Properties.

    Science.gov (United States)

    Warren, Maya M; Hartel, Richard W

    2018-03-01

    Ice cream is a multiphase frozen food containing ice crystals, air cells, fat globules, and partially coalesced fat globule clusters dispersed in an unfrozen serum phase (sugars, proteins, and stabilizers). This microstructure is responsible for ice cream's melting characteristics. By varying both formulation (emulsifier content and overrun) and processing conditions (dasher speed), the effects of different microstructural elements, particularly air cells and fat globule clusters, on ice cream melt-down properties were studied. Factors that caused an increase in shear stress within the freezer, namely increasing dasher speed and overrun, caused a decrease in air cell size and an increase in extent of fat destabilization. Increasing emulsifier content, especially of polysorbate 80, caused an increase in extent of fat destabilization. Both overrun and fat destabilization influenced drip-through rates. Ice creams with a combination of low overrun and low fat destabilization had the highest drip-through rates. Further, the amount of remnant foam left on the screen increased with reduced drip-through rates. These results provide a better understanding of the effects of microstructure components and their interactions on drip-through rate. Manipulating operating and formulation parameters in ice cream manufacture influences the microstructure (air cells, ice crystals, and fat globule clusters). This work provides guidance on which parameters have most effect on air cell size and fat globule cluster formation. Further, the structural characteristics that reduce melt-down rate were determined. Ice cream manufacturers will use these results to tailor their products for the desired quality attributes. © 2018 Institute of Food Technologists®.

  18. The Economics of NASA Mission Cost Reserves

    Science.gov (United States)

    Whitley, Sally; Shinn, Stephen

    2012-01-01

    Increases in NASA mission costs have led to analysis of the causes and magnitude of historical mission overruns as well as mitigation and prevention attempts. This paper hypothesizes that one cause is that the availability of reserves may reduce incentives to control costs. We draw a comparison to the insurance concept of moral hazard, and we use actuarial techniques to better understand the increase in mission costs due to the availability of reserves. NASA's CADRe database provided the data against which we tested our hypothesis and discovered that there is correlation between the amount of available reserves and project overruns, particularly for mission hardware cost increases. We address the question of how to prevent reserves from increasing mission spending without increasing cost risk to projects.

  19. What Causes Cost Overrun in Transport Infrastructure Projects?

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    cost escalation for three types of project ownership - private, state-owned enterprise and other public ownership - it is shown that the oft-seen claim that public ownership is problematic and private ownership effective in curbing cost escalation is an oversimplification. Type of accountability......This article presents results from the first statistically significant study of causes of cost escalation in transport infrastructure projects. The study is based on a sample of 258 rail, bridge, tunnel and roads projects worth US$90 billion. The focus is on the dependence of cost escalation on (1......) length of project implementation phase, (2) size of project and (3) type of project ownership. First, it is found with very high statistical significance that cost escalation is strongly dependent on length of implementation phase. The policy implications are clear: Decision makers and planners should...

  20. Cost overruns and demand shortfalls - Deception or selection?

    DEFF Research Database (Denmark)

    Eliasson, Jonas; Fosgerau, Mogens

    2013-01-01

    whether to implement projects. Using a database of projects we present examples indicating that the selection bias may be substantial. The examples also indicate that benefit-cost ratios remain a useful selection criterion even when cost and benefits are highly uncertain, gainsaying the argument......A number of highly cited papers by Flyvbjerg and associates have shown that ex ante infrastructure appraisals tend to be overly optimistic. Ex post evaluations indicate a bias where investment costs are higher and benefits lower on average than predicted ex ante. These authors argue that the bias...... that such uncertainties render cost-benefit analyses useless. © 2013 Elsevier Ltd....

  1. The Psychology of Cost Estimating

    Science.gov (United States)

    Price, Andy

    2016-01-01

    Cost estimation for large (and even not so large) government programs is a challenge. The number and magnitude of cost overruns associated with large Department of Defense (DoD) and National Aeronautics and Space Administration (NASA) programs highlight the difficulties in developing and promulgating accurate cost estimates. These overruns can be the result of inadequate technology readiness or requirements definition, the whims of politicians or government bureaucrats, or even as failures of the cost estimating profession itself. However, there may be another reason for cost overruns that is right in front of us, but only recently have we begun to grasp it: the fact that cost estimators and their customers are human. The last 70+ years of research into human psychology and behavioral economics have yielded amazing findings into how we humans process and use information to make judgments and decisions. What these scientists have uncovered is surprising: humans are often irrational and illogical beings, making decisions based on factors such as emotion and perception, rather than facts and data. These built-in biases to our thinking directly affect how we develop our cost estimates and how those cost estimates are used. We cost estimators can use this knowledge of biases to improve our cost estimates and also to improve how we communicate and work with our customers. By understanding how our customers think, and more importantly, why they think the way they do, we can have more productive relationships and greater influence. By using psychology to our advantage, we can more effectively help the decision maker and our organizations make fact-based decisions.

  2. Causes of time overrun of education trust fund building projects in ...

    African Journals Online (AJOL)

    The study surveyed Education Trust Fund building projects in some tertiary institutions in north central Nigeria with the aim of ascertaining the causes of time overrun of these projects. The survey was carried out with the help of a structured questionnaire administered to clients, consultants and contractors' alike.

  3. Cost Accounting: Production and Equipment Services.

    Science.gov (United States)

    Schmid, William T.

    Cost accounting for audiovisual productions should include direct costs, and, in some cases, the media administrator may have to calculate a per-hour surcharge for general operating overhead as well. Such procedures enable the administrator to determine cost effectiveness, to control cost overruns, and to generate more staff efficiency. Cost…

  4. Time-history of shock waves overrunning three-dimensional, cylindrical models

    International Nuclear Information System (INIS)

    Langheim, H.; Loeffler, E.

    To investigate the time-history of the Mach-stem of a shock wave overrunning a nuclear power plant shadowgraphs of threedimensional, cylindrical models with a globe cap were analysed. These models simulating the containment building differ only in the height of the cylinder. They were exposed with shock waves of shock strengths of 1.2 and 1.4, being equal to a peak reflexion overpressure of 0.45 resp. 1.0 bar. The time-histories of the Mach-stem differ only slightly. For this reason it can be stated that these time-histories are independent of the shock strength and the height of the cylinder in the prescribed range of the research program. In comparison with values given in the literature great differences were found at the rear side near the stagnation point of the globe cap resp. the stagnation line of the cylinder. The measured time for overrunning of the shock wave is the same as the time of arrival of the pressure-pulse at the interesting point of the model. This knowledge is a necessary premise for pressure-measurings from which the total load of structure can be determined. (orig.) [de

  5. Incorporating psychological influences in probabilistic cost analysis

    Energy Technology Data Exchange (ETDEWEB)

    Kujawski, Edouard; Alvaro, Mariana; Edwards, William

    2004-01-08

    Today's typical probabilistic cost analysis assumes an ''ideal'' project that is devoid of the human and organizational considerations that heavily influence the success and cost of real-world projects. In the real world ''Money Allocated Is Money Spent'' (MAIMS principle); cost underruns are rarely available to protect against cost overruns while task overruns are passed on to the total project cost. Realistic cost estimates therefore require a modified probabilistic cost analysis that simultaneously models the cost management strategy including budget allocation. Psychological influences such as overconfidence in assessing uncertainties and dependencies among cost elements and risks are other important considerations that are generally not addressed. It should then be no surprise that actual project costs often exceed the initial estimates and are delivered late and/or with a reduced scope. This paper presents a practical probabilistic cost analysis model that incorporates recent findings in human behavior and judgment under uncertainty, dependencies among cost elements, the MAIMS principle, and project management practices. Uncertain cost elements are elicited from experts using the direct fractile assessment method and fitted with three-parameter Weibull distributions. The full correlation matrix is specified in terms of two parameters that characterize correlations among cost elements in the same and in different subsystems. The analysis is readily implemented using standard Monte Carlo simulation tools such as {at}Risk and Crystal Ball{reg_sign}. The analysis of a representative design and engineering project substantiates that today's typical probabilistic cost analysis is likely to severely underestimate project cost for probability of success values of importance to contractors and procuring activities. The proposed approach provides a framework for developing a viable cost management strategy for

  6. Fast-track, low-cost construction starts with the owner

    International Nuclear Information System (INIS)

    Smock, R.

    1992-01-01

    As we approach the threshold of a new round of ordering of base load generating capacity after a 15-year hiatus, power pant owners are taking a long, hard look at construction. The last round of base load construction was plagued with construction cost overruns and delays. Billions of dollars in cost overruns, many attributable to construction delays, were not allowed to be placed in utilities' rate bases. Those problems will not be tolerated in the next round. During the past few years the construction climate has changed. Non-utility power producers have demonstrated and ability to build small power plants-including many steam plants burning solid fuels-quickly and at surprisingly low costs. In this paper the cost-plus approach traditionally taken by more utilities, who will lead in the base-load construction phase, is being seriously questioned

  7. A Model for Understanding the Relationship Between Transaction Costs and Acquisition Cost Breaches

    Science.gov (United States)

    2014-04-30

    an assistant professor and received a BA in anthropology and a BA and MA in economics (2004) and a PhD in political economy and public policy (2008...between transaction costs and cost overruns. Biggs (2013) showed that as the EAC SE/PM cost ratio rises there is a statistically significant corresponding...Estimate at Completion ( EAC ) is the sum of the ACWP and the estimate to completion (ETC) for the remaining work. The ETC can be calculated using the cost

  8. Software cost estimation

    NARCIS (Netherlands)

    Heemstra, F.J.

    1992-01-01

    The paper gives an overview of the state of the art of software cost estimation (SCE). The main questions to be answered in the paper are: (1) What are the reasons for overruns of budgets and planned durations? (2) What are the prerequisites for estimating? (3) How can software development effort be

  9. Software cost estimation

    NARCIS (Netherlands)

    Heemstra, F.J.; Heemstra, F.J.

    1993-01-01

    The paper gives an overview of the state of the art of software cost estimation (SCE). The main questions to be answered in the paper are: (1) What are the reasons for overruns of budgets and planned durations? (2) What are the prerequisites for estimating? (3) How can software development effort be

  10. Effect Of Adding Sago Flour In Yoghurt Based On Viscosity, Overrun, Melting Rate And Total Solid Of Yoghurt Ice Cream

    Directory of Open Access Journals (Sweden)

    Ika Ayu Wijayanti

    2017-03-01

    Full Text Available The purpose of this research was to find out the best concentration of adding sago flour in yoghurt based on viscosity, overrun, melting rate and total solid of yoghurt ice cream. The experiment was designed by Completely Randomized Design (CRD using four treatments were 0 %, 2 %, 4 %, 6 % from volume of fresh milk and four replication. The data were analyzed by using Analysis of Variance (ANOVA and continued by Duncan’s Multiple Range Test (DMRT. Result of this research showed that concentration of adding sago flour in yoghurt gave highly significant difference effect (P<0.01 on viscosity, overrun, melting rate and total solid of yoghurt ice cream. It can be concluded that the adding of sago flour 2% in yoghurt gave the best result with the viscosity was 1750.75 cP, overrun was 25.14%, melting rate was 39.13 minutes/50 g, total solid was 36.20% and gave the best quality of yoghurt ice cream.

  11. $35 billion habit: will nuclear cost overruns bankrupt the utilities

    International Nuclear Information System (INIS)

    Morgan, R.E.

    1980-01-01

    The Nuclear Regulatory Commission (NRC) has proposed some 150 modifications in the design and operation of nuclear power plants as a result of the accident at Three Mile Island. The Atomic Industrial Forum estimates the total cost of the NRC's proposed rule changes at $35.5 billion ($3.5 billion in capital costs for the entire industry, and $32 billion in outage and construction-delay costs to the utilities) for existing facilities and for those with construction well underway. The changes range from improved training for reactor workers to a major overhaul of the reactor-containment design. The nuclear industry is asking the NRC to modify the proposals citing excessive costs (like the $100 million changes needed for a plant that cost $17 million to build) and safety (some of the complex regulations may interfere with safety). Financing the changes has become a major problem for the utilities. If the regulators allow all the costs to be passed along to the consumer, the author feels electricity will be too expensive for the consumer

  12. Large Hadron Collider in crisis as magnet costs spiral upwards

    CERN Multimedia

    Adam, D

    2001-01-01

    Managers of the LHC project admitted this week that it faces cost overruns of several hundred million dollars. CERN will face years of budget cuts but this will cover only a fraction of the extra costs - the 20 member states will be asked to cover the rest (1 page).

  13. Comprehensive investigation into historical pipeline construction costs and engineering economic analysis of Alaska in-state gas pipeline

    Science.gov (United States)

    Rui, Zhenhua

    This study analyzes historical cost data of 412 pipelines and 220 compressor stations. On the basis of this analysis, the study also evaluates the feasibility of an Alaska in-state gas pipeline using Monte Carlo simulation techniques. Analysis of pipeline construction costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary by diameter, length, volume, year, and location. Overall average learning rates for pipeline material and labor costs are 6.1% and 12.4%, respectively. Overall average cost shares for pipeline material, labor, miscellaneous, and right of way (ROW) are 31%, 40%, 23%, and 7%, respectively. Regression models are developed to estimate pipeline component costs for different lengths, cross-sectional areas, and locations. An analysis of inaccuracy in pipeline cost estimation demonstrates that the cost estimation of pipeline cost components is biased except for in the case of total costs. Overall overrun rates for pipeline material, labor, miscellaneous, ROW, and total costs are 4.9%, 22.4%, -0.9%, 9.1%, and 6.5%, respectively, and project size, capacity, diameter, location, and year of completion have different degrees of impacts on cost overruns of pipeline cost components. Analysis of compressor station costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary in terms of capacity, year, and location. Average learning rates for compressor station material and labor costs are 12.1% and 7.48%, respectively. Overall average cost shares of material, labor, miscellaneous, and ROW are 50.6%, 27.2%, 21.5%, and 0.8%, respectively. Regression models are developed to estimate compressor station component costs in different capacities and locations. An investigation into inaccuracies in compressor station cost estimation demonstrates that the cost estimation for compressor stations is biased except for in the case of material costs. Overall average

  14. An application of the Rayleigh distribution to contract cost data

    OpenAIRE

    Abernethy, Thomas S.

    1984-01-01

    Approved for public release; distribution unlimited Accurate cost models are essential to the proper monitoring of contract cost data. The greater the accuracy of the model, the earlier contract cost overruns can be recognized and their cause(s) ascertained. The availability of a variety of cost models allows flexibility in choosing the correct model for the particular circumstances and increases the chances of being able to select a model that can provide reliable forecasts about future c...

  15. Trends in lumber processing in the Western United States. Part II: Overrun and lumber recovery factors.

    Science.gov (United States)

    Charles E. Keegan; Todd A. Morgan; Keith A. Blatner; Jean M. Daniels

    2010-01-01

    This article describes trends in three measures of lumber recovery for sawmills in the western United States: lumber overrun (LO), lumber recovery factor (LRF), and cubic lumber recovery (CLR). All states and regions showed increased LO during the last three decades. Oregon and Montana had the highest LO at 107 and 100 percent, respectively. Alaska had the lowest LO at...

  16. Understanding the costs and schedule of hydroelectric projects

    International Nuclear Information System (INIS)

    Merrow, E.W.; Schroeder, B.R.

    1991-01-01

    This paper is based on a study conducted for the World Bank which evaluated the feasibility of developing an empirically based ex ante project analysis system for hydroelectric projects. The system would be used to assess: the reasonableness of engineering-based cost and schedule estimates used for project appraisal and preliminary estimates used to select projects for appraisal; and the potential for cost growth and schedule slip. The system would help identify projects early in the project appraisal process that harbor significantly higher than normal risks of overrunning cost and schedule estimates

  17. Were the hydro dams financed by the World Bank from 1976 to 2005 worthwhile?

    International Nuclear Information System (INIS)

    Awojobi, Omotola; Jenkins, Glenn P.

    2015-01-01

    Because hydro dams are complex to design and usually involve long-term planning, they are particularly susceptible to cost and time overruns. The controversy surrounding their development remains an unresolved issue in the energy policy debate. This study re-examines the cost issues associated with a portfolio of 58 dams that were financed by the World Bank from 1976 to 2005. Further, an estimate is made of the value of the benefits produced by these investments to determine the magnitude of economic rates of return for the individual projects and the overall portfolio of dams. Even though this portfolio of dams suffered substantially from cost overruns, the net contribution of these dams has been positive and substantial. The ex-post real economic rate of return for the entire portfolio is estimated to be greater than 17 percent. The important policy implication of this study is that each investment in a hydro dam needs to be appraised taking into consideration the distribution and probabilities of costs that might be incurred, as well as the potential benefits. Adequate margins must exist of ex-ante benefits over costs to account for the risks of cost overruns. - Highlights: • An ex-post evaluation is made of hydroelectric dams financed by the World Bank. • Cost overruns, time overruns, and the cost of time overruns are measured. • The PV of benefits produced by this portfolio was 1.8 times the PV of the costs. • Real cost overruns were 27% and cost of time overruns 3.5% of ex-ante costs. • Risks of cost overruns must be evaluated in relation to projected benefits of dams.

  18. Jambolan sherbets overrun, color, and acceptance in relation to the sugar, milk, and pulp contents in formulation

    Directory of Open Access Journals (Sweden)

    Jackeline Cintra SOARES

    2018-05-01

    Full Text Available Abstract The aim of this study was to evaluate in sherbet formation the effects of sugar, milk, and jambolan pulp quantity on the overrun, color, physicochemical characteristics, microbiological characteristics, and acceptance of the experimental sherbets, in addition to evaluating the bioactive compounds of the selected product. Seven formulations were established through the Simplex method. The formulation with 20g 100g-1 sugar, 45g 100g-1 milk, and 35g 100g-1 jambolan pulp was selected (S5 because it was included among the most accepted sensorially (S4 and S5, and also presented higher overrun, chroma, SST/AT, and pH than S4, receiving the scores 8.0; 8.2, 6.4 and 7.1 and 6.1, respectively, for appearance, color, flavor, texture, and odor. The selected sherbet presented a high total phenolic compound content of 192mg gallic acid g-1, and a percentage of DPPH inhibition of 73%. It is concluded that it is possible to produce jambolan sherbet with desirable physical, chemical, microbiological, and sensory characteristics, which can increase the possibilities of applying the fruit as an ingredient in the edible ice cream industry.

  19. 78 FR 43203 - Federal Acquisition Regulation; Submission for OMB Review; Contract Funding-Limitation of Costs...

    Science.gov (United States)

    2013-07-19

    ... information collection would violate the fundamental purposes of the Paperwork Reduction Act because of the... notification typically involves an observation of the contractors accounting and financial reporting system... probable cost overruns carries with it a duty to maintain an accounting and financial reporting system...

  20. A Study of the Establishment of Cost and Schedule Variance Thresholds on Department of Defense Major Program Contracts

    Science.gov (United States)

    1993-09-01

    to C/SCSC. Chicago IL: Probus Publishing Company, 1992. Foster, George and Horngren , Charles T. Cost Accounting , A Managerial Emphasis (Seventh Edition...Bayesian Approach to Statistical Decision," The Journal of Business 34:471-489 (October, 1961). Horngren , Charles T. and George Foster. Cost Accounting ...increases for 20 major weapons programs, many of which have had tecnical problems and huge cost overruns, according to the draft of a General Account Office

  1. Cost overruns and demand shortfalls in urban rail and other infrastructure

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    2007-01-01

    Risk, including economic risk, is increasingly a concern for public policy and management. The possibility of dealing effectively with risk is hampered, however, by lack of a sound empirical basis for risk assessment and management. This article demonstrates the general point for cost and demand ...... is proposed as a model for other types of policies and projects in order to improve economic and financial risk assessment and management in policy and planning....

  2. Should we build more large dams? The actual costs of hydropower megaproject development

    International Nuclear Information System (INIS)

    Ansar, Atif; Flyvbjerg, Bent; Budzier, Alexander; Lunn, Daniel

    2014-01-01

    A brisk building boom of hydropower mega-dams is underway from China to Brazil. Whether benefits of new dams will outweigh costs remains unresolved despite contentious debates. We investigate this question with the “outside view” or “reference class forecasting” based on literature on decision-making under uncertainty in psychology. We find overwhelming evidence that budgets are systematically biased below actual costs of large hydropower dams—excluding inflation, substantial debt servicing, environmental, and social costs. Using the largest and most reliable reference data of its kind and multilevel statistical techniques applied to large dams for the first time, we were successful in fitting parsimonious models to predict cost and schedule overruns. The outside view suggests that in most countries large hydropower dams will be too costly in absolute terms and take too long to build to deliver a positive risk-adjusted return unless suitable risk management measures outlined in this paper can be affordably provided. Policymakers, particularly in developing countries, are advised to prefer agile energy alternatives that can be built over shorter time horizons to energy megaprojects. - Highlights: • We investigate ex post outcomes of schedule and cost estimates of hydropower dams. • We use the “outside view” based on Kahneman and Tversky's research in psychology. • Estimates are systematically and severely biased below actual values. • Projects that take longer have greater cost overruns; bigger projects take longer. • Uplift required to de-bias systematic cost underestimation for large dams is +99%

  3. Managing the Cost Overrun Risks of Hydroelectric Dams: An Application of Reference Class Forecasting Techniques

    OpenAIRE

    Omotola Awojobi; Glenn P. Jenkins

    2015-01-01

    Hydropower investments have been subject to intense criticism over environmental issues and the common experience with cost uncertainty. In this study we address the issue of uncertainty in cost projections by applying reference class forecasting (RCF) in order to improve the reliability of costs used for making decisions under uncertainty. This technique makes it possible to closely link contingency estimates to the likely incidence of uncertainty of construction costs for hydroelectric dams...

  4. The Impact of Human Capital on the Cost of Air Force Acquisition Programs

    National Research Council Canada - National Science Library

    Feuring, Jeffrey C

    2007-01-01

    .... The measure of output is the average cost overrun of Air Force contracts. A time series regression was conducted while controlling for other economic factors such as budgetary fluctuations and inflation. The results show positive effects of Human Capital on performance. Other policy implications of the study are the importance of budgetary stability, inflation predictions and the Defense Acquisition Workforce Improvement Act (DAWIA).

  5. Estimating Required Contingency Funds for Construction Projects using Multiple Linear Regression

    National Research Council Canada - National Science Library

    Cook, Jason J

    2006-01-01

    Cost overruns are a critical problem for construction projects. The common practice for dealing with cost overruns is the assignment of an arbitrary flat percentage of the construction budget as a contingency fund...

  6. Results from the NASA Spacecraft Fault Management Workshop: Cost Drivers for Deep Space Missions

    Science.gov (United States)

    Newhouse, Marilyn E.; McDougal, John; Barley, Bryan; Stephens Karen; Fesq, Lorraine M.

    2010-01-01

    Fault Management, the detection of and response to in-flight anomalies, is a critical aspect of deep-space missions. Fault management capabilities are commonly distributed across flight and ground subsystems, impacting hardware, software, and mission operations designs. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for five missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that four out of the five missions studied had significant overruns due to underestimating the complexity and support requirements for fault management. As a result of this and other recent experiences, the NASA Science Mission Directorate (SMD) Planetary Science Division (PSD) commissioned a workshop to bring together invited participants across government, industry, and academia to assess the state of the art in fault management practice and research, identify current and potential issues, and make recommendations for addressing these issues. The workshop was held in New Orleans in April of 2008. The workshop concluded that fault management is not being limited by technology, but rather by a lack of emphasis and discipline in both the engineering and programmatic dimensions. Some of the areas cited in the findings include different, conflicting, and changing institutional goals and risk postures; unclear ownership of end-to-end fault management engineering; inadequate understanding of the impact of mission-level requirements on fault management complexity; and practices, processes, and tools that have not kept pace with the increasing complexity of mission requirements and spacecraft systems. This paper summarizes the

  7. Flexible resource management and its effect on project cost and duration

    Science.gov (United States)

    Pinha, Denis C.; Ahluwalia, Rashpal S.

    2018-06-01

    In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinatorial modes for tasks, multi-skilled resources, and multiple calendars for resources. A case study reported in the literature is presented to demonstrate the capabilities of this method. As for practical implications, this approach enhances the decision-making process which results in improved solutions in terms of total project duration and cost. From an academic viewpoint, this paper adds empirical evidence to enrich the existing literature, as it highlights relevant issues to model properly the complexity of real-life projects.

  8. Factors influencing the motivation and productivity of craftsmen and foremen on large construction projects

    International Nuclear Information System (INIS)

    Garner, D.F.; Borcherding, J.D.; Samelson, N.M.

    1979-08-01

    Substantial cost overruns and schedule delays are traits of the power plant construction industry, specifically the young and controversial nuclear power plant construction industry. These cost and schedule overruns are having a significant effect on the economic feasibility of many power plants, and the future energy supply network of our country may have to be restructured in light of these overruns. A major cause of cost overruns is related to the declining rate of productivity of workers. Marjatta Strandell, an engineering and construction expert for the Pacific Power and Light Company, Portland, Oregon, reports that since 1970 craft productivity in nuclear and fossil-fuel power plant construction has been decreasing at an average annual rate of four percent. The cumulative effect of this indicates that, by 1980, the craft productivity would be a mere sixty percent of the 1970 craft productivity

  9. Sadhana | Indian Academy of Sciences

    Indian Academy of Sciences (India)

    Home; Journals; Sadhana. GAURAV DOBARIYA. Articles written in Sadhana. Volume 41 Issue 6 June 2016 pp 679-693. Identifying factors causing cost overrun of the construction projects in India · SWAPNIL P WANJARI GAURAV DOBARIYA · More Details Abstract Fulltext PDF. Delay and cost overrun are common ...

  10. Nuclear. Areva, a French fission

    International Nuclear Information System (INIS)

    Dupin, Ludovic

    2015-01-01

    This article comments the difficulties and problems faced by Areva for its activity of nuclear reactor construction, and which leaded to the transfer of this activity from Areva to EDF while Areva will keep its uranium providing and fuel enrichment activities. These difficulties and problems concern the Flamanville EPR (the construction is 5 years late, vessel defects have just been identified, cost overruns), the Finnish EPR (7 years late, a 5 billions cost overrun), the Jules Horowitz research reactor (5 years late, cost overrun), and strategic choices (notably with respect to the post-Fukushima context). The article also outlines that other activities (mining, enrichment, reactor maintenance) are still doing well, and then briefly discusses the future of Areva NP

  11. Analysis of Cost of Rework on Time and Cost Performance of Building Construction Projects in Abuja, Nigeria

    Directory of Open Access Journals (Sweden)

    Emmanuel Chidiebere Eze

    2018-01-01

    Full Text Available Rework is a menace that leads to undesired and unnecessary loss of efforts, it degrades project cost and schedule performance of construction projects, both at design and construction phases. This study therefore, analyzed the impact of cost of rework on time and cost performance of building construction projects in Nigerian, using selected commercial building project within the country’s capital. A pro forma was adopted for gathering data on rework cost, project cost and time of selected building projects, while structured questionnaire was used to collect information on the likely measures for reducing rework incidences from construction professionals that were involved in the delivery of the identified projects. Regression analysis, relative importance index and Kruskal-Walis test were employed for data analysis. The study revealed a significant relationship between the cost of rework and initial and final project cost of delivering commercial buildings, as an average of 3.53% impact on the initial project cost, 46.60% contribution to cost overrun, and p-value of 0.000 was observed on all assessed projects. For the project delivery time, a significant relationship between the cost of rework and initial and final project duration, as an average of 7.35% impact on the initial delivery time, extra 19 days and p-value of 0.000 was observed on all assessed projects. Team building and education, management commitment, employee involvement, were some of the best possible measures to minimized rework problems.

  12. Underestimation of Project Costs

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  13. Communication from the CRE relative to the calculation of the charges of the power production public utility for the year 2002; Communication de la CRE relative au calcul des charges du service public de la production d'electricite pour l'annee 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-05-01

    After having analyzed the answers given to the public inquiry about the methods used for the calculation of the saved costs, the French commission of electricity regulation (CRE) indicates in this document the trends it has retained for the calculation of the charges of the power production public utility for 2002: cost overruns due to the obligation of purchase and to the purchase contracts anterior to the law from February 10, 2000; production cost overruns in non-interconnected areas (Corsica and overseas departments). (J.S.)

  14. An empirical analysis of the relationship between cost of control activities and project management success

    Directory of Open Access Journals (Sweden)

    Al-Tmeemy Samiaah

    2018-01-01

    Full Text Available To achieve the objectives of continuous improvement programs, construction managers must link the achievement of quality with cost. This paper aims to associate project management success (PMS with cost of control (COC activities in an empirical manner. Thus, the purpose is to determine the extent to which COC activities impact PMS. Quantitative method was adopted to collect data from Malaysian building companies using postal and email surveys. Hypothesis is tested using correlation and simple linear regression analysis. The findings of this study indicate that COC activities are positively associated with the PMS. The empirical evidences obtained from this research, provides financial justification for all quality improvement efforts. This can assist building contractors to enhance the success of project management by reducing the level of business failures due to poor quality, cost overruns, and delays.

  15. Systems Engineering Using Heritage Spacecraft Technology: Lessons Learned from Discovery and New Frontiers Deep Space Missions

    Science.gov (United States)

    Barley, Bryan; Newhouse, Marilyn; Clardy, Dennon

    2011-01-01

    In the design and development of complex spacecraft missions, project teams frequently assume the use of advanced technology or heritage systems to enable a mission or reduce the overall mission risk and cost. As projects proceed through the development life cycle, increasingly detailed knowledge of the advanced or heritage systems and the system environment identifies unanticipated issues that result in cost overruns or schedule impacts. The Discovery & New Frontiers (D&NF) Program Office recently studied cost overruns and schedule delays resulting from advanced technology or heritage assumptions for 6 D&NF missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that the cost and schedule growth did not result from technical hurdles requiring significant technology development. Instead, systems engineering processes did not identify critical issues early enough in the design cycle to ensure project schedules and estimated costs address the inherent risks. In general, the overruns were traceable to: inadequate understanding of the heritage system s behavior within the proposed spacecraft design and mission environment; an insufficient level of experience with the heritage system; or an inadequate scoping of the system-wide impacts necessary to implement the heritage or advanced technology. This presentation summarizes the study s findings and offers suggestions for improving the project s ability to identify and manage the risks inherent in the technology and heritage design solution.

  16. A Venture Capital Mixed Model for the Acquisition of Defense Software Products

    National Research Council Canada - National Science Library

    Botsakos, Michael T

    2007-01-01

    .... Cost and schedule overruns are the consequence of the software development models selected, inaccurate estimation of size, time, and cost, the instability of user requirements, and poor decision...

  17. Planning and Estimation of Operations Support Requirements

    Science.gov (United States)

    Newhouse, Marilyn E.; Barley, Bryan; Bacskay, Allen; Clardy, Dennon

    2010-01-01

    Life Cycle Cost (LCC) estimates during the proposal and early design phases, as well as project replans during the development phase, are heavily focused on hardware development schedules and costs. Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead to de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Any LCC growth can directly impact the programs' ability to fund new missions, and even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations. The National Aeronautics and Space Administration (NASA) D&NF Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns at or after launch due to underestimation of the complexity and supporting requirements for operations activities; the fifth mission had not launched at the time of the mission. The drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This paper updates the D

  18. The contributions of construction material waste to project cost ...

    African Journals Online (AJOL)

    countries experience overruns exceeding 100% of the initial budget. (Memon .... The approximate conversion rates used as at the period of data collection were: Nigerian ..... Majestic Hotel, 7-8 July 2010, Kuching, Sarawak, Malaysia. Imam, A.

  19. Application Of The Work Breakdown Structure In Determining Cost Buffers In Construction Schedules

    Directory of Open Access Journals (Sweden)

    Połoński M.

    2015-03-01

    Full Text Available The paper presents methods of determining the location of cost buffers and corresponding contingency costs in the CPM schedule based on its work breakdown structure. Application of correctly located cost buffers with appropriately established reserve costs is justified by the common overrunning of scheduled costs in construction projects. Interpolated cost buffers (CB as separate tasks have been combined with relevant summary tasks by the start–to–start (SS relationship, whereas the time of their execution has been dynamically connected with the time of accomplishment of particular summary tasks using the “paste connection” option. Besides cost buffers linked with the group of tasks assigned to summary tasks, a definition of the cost buffer for the entire project (PCB has been proposed, i.e. as one initial task of the entire project. Contingency costs corresponding to these buffers, depending on the data that the planner has at his disposal, can be determined using different methods, but always depend on the costs of all tasks protected by each buffer. The paper presents an exemplary schedule for a facility and the method of determining locations and cost for buffers CB and PCB, as well as their influence on the course of the curve illustrating the budgeted cost of work scheduled (BCWS. The proposed solution has been adjusted and presented with consideration of the possibilities created by the scheduling software MS Project, though its general assumptions may be implemented with application of other similar specialist tools.

  20. Effectiveness evaluation of contingency sum as a risk management ...

    African Journals Online (AJOL)

    Ethiopian Journal of Environmental Studies and Management ... manage risks prone projects have adopted several methods, one of which is contingency sum. ... initial project cost, cost overrun and percentage allowed for contingency.

  1. Proposal from the Commission of Electricity Regulation (CRE) dated from September 26, 2002 relative to the estimated amount of the charges of the power production public utility for 2003; Proposition de la Commission de Regulation de l'Electricite en date du 26 septembre 2002 relative au montant previsionnel des charges du service public de la production d'electricite pour 2003

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This document presents the estimated amount of the charges of the power production public utility for 2003. This estimation is based on the detailed data supplied by the operators, like Electricite de France (EdF), who bear the charges and by the managers of the public networks. The calculation method used for the estimation is detailed in the appendix: production cost overruns in non-interconnected areas, cost overruns due to the obligation of electricity purchase and to the contracts of purchase anterior to the law from February 10, 2000, estimated amount of the charges to be compensated and of the treasury management costs, estimated number of kWh submitted to contribution in 2003 and unit estimated contribution. (J.S.)

  2. France - country of the atom

    International Nuclear Information System (INIS)

    Bunyard, P.; Goldsmith, E.

    1981-01-01

    The subject is discussed under the headings: the cost of delivered electricity; the cost of research and development; capital costs; cost overruns; correction for inflation; load factor; insurance against accidents; hydroelectricity; new coal-fired plant; sale of electricity at a loss; fuel costs; breeder reactors. (U.K.)

  3. Leadership Quality for Malaysia Construction Leader to Steer a Success Construction Project

    OpenAIRE

    Ngah Nasaruddin Nur Ain; Abdul Rahman Ismail

    2016-01-01

    Issues that dominate the construction industry for the long time such as time overrun, cost overrun, quality of construction and also safety during the construction process are difficult to resolve because of several factors involved which amongst them are leadership quality in the industry. Solving these issues can make the industry more sustainable in nature. This paper presents the need of leadership quality among construction parties involved to steer a construction project successfully. ...

  4. Lessons Learned for Planning and Estimating Operations Support Requirements

    Science.gov (United States)

    Newhouse, Marilyn

    2011-01-01

    Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.

  5. Software Process Improvement through the Removal of Project-Level Knowledge Flow Obstacles: The Perceptions of Software Engineers

    Science.gov (United States)

    Mitchell, Susan Marie

    2012-01-01

    Uncontrollable costs, schedule overruns, and poor end product quality continue to plague the software engineering field. Innovations formulated with the expectation to minimize or eliminate cost, schedule, and quality problems have generally fallen into one of three categories: programming paradigms, software tools, and software process…

  6. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.

  7. Tactical Aircraft. DOD Needs a Joint and Integrated Investment Strategy

    National Research Council Canada - National Science Library

    2007-01-01

    .... DOD has already incurred substantial cost and schedule overruns in its acquisition of new systems, and further delays could require billions of dollars in additional investments to keep legacy...

  8. Sensitivity study of the factors affecting first-of-a-kind and Nth-of-a-kind Small Modular Reactor investment costs - 15108

    International Nuclear Information System (INIS)

    Boldon, L.; Liu, L.; Sabharwall, P.; Schneider, E.

    2015-01-01

    Conventional nuclear reactors require significant investment and pose financial, regulatory, and political risks. Small modular reactors (SMRs), on the other hand, provide an attractive alternative due to substantially reduced up-front investment costs and financial risks; more flexible deployment schedules and operations; modular fabrication and faster onsite assembly; and incorporation into hybrid energy systems or even cogeneration applications such as desalination, district heating, and industrial process heat. This paper aims to develop a general methodology of assessing the economics of first-of-a-kind (FOAK) and nth-of-a-kind (NOAK) SMRs as part of an effort to determine the conditions that would make them competitive with other generation technologies. Ultimately, this paper will provide background information on the various factors impacting nuclear reactor capital and operational costs; detail technology independent cost estimates for water-cooled SMRs; and provide a parametric study on learning and construction and deployment effects. This study demonstrates precisely why the financial risks are drastically reduced for an SMR site, making SMR nuclear projects feasible for many companies, rather than just a handful which are able to finance multi-billion dollar projects and handle the potential construction or licensing delays or cost overruns

  9. 77 FR 73675 - Notice of Lodging of Proposed Consent Decree Under the Comprehensive Environmental Response...

    Science.gov (United States)

    2012-12-11

    ... recover past response costs incurred and other relief in connection with the B.F. Goodrich Superfund Site....25 million toward the settlement funds, as well as to participate in funding certain cost overruns... $9.95 million in cash contributions to the settlement funds. In return, the United States provides...

  10. 'Big science' and public trust

    CERN Multimedia

    2001-01-01

    The LHC project now faces cost overruns of several hundred million dollars. It has been suggested that poor financial controls and inadequate accounting procedures are at least partly to blame (1/2 page).

  11. Deliberating A Contract Type Based Risk Mitigation Strategy For South African Defense Acquisitions

    Science.gov (United States)

    2016-06-01

    cash flow may lead to cost overruns and schedule slippage. Table 1 shows the description, schedule and cost performance status for two SA DOD...possibility of applying a contract-type based strategy to manage acquisition program costs and schedule risks for the South African (SA) Department of...deviations between technical, cost and schedule performance. 14. SUBJECT TERMS acquisition process, defense acquisition, contract-type, risk

  12. IDRC in Sri Lanka

    International Development Research Centre (IDRC) Digital Library (Canada)

    organization Sarvodaya — in collabora- ... Information and Communication ... ing leading to waste, cost overruns, and ... Building a culture of evaluation ... hand with transition to democracy. ... choice and change to those who need it most.

  13. Causes of construction cost and time overruns: The 2010 FIFA World ...

    African Journals Online (AJOL)

    Die toekenning van die 2010 FIFA Wêreldbekertoernooi aan Suid-Afrika het tot gevolg gehad dat tien stadions opgegradeer of nuut gebou moes word. Hoewel die tien stadions gereed was vir die toernooi het feitlik al die stadionprojekte skedulevertragings en oorspandering beleef. Hierdie studie het ten doel om die redes ...

  14. Causes of construction cost and time overruns: The 2010 FIFA World ...

    African Journals Online (AJOL)

    the FIFA World Cup remains a sought after goal for any country. Due to the magnitude ... unit of measure, the quantitative results from measuring against original project ... already identified (Dell'Apa, 2008), the South African construction industry started ... A study completed by the International Program in the Management.

  15. On the rate of return and risk factors to international oil companies in Iran's buy-back service contracts

    International Nuclear Information System (INIS)

    Ghandi, Abbas; Lin Lawell, C.-Y. Cynthia

    2017-01-01

    We analyze the rate of return (ROR) and risk factors faced by Shell Exploration, an international oil company (IOC), in its Soroosh and Nowrooz buy-back service contract in Iran. In particular, based on our models of cash flow, we analyze the buy-back contract specific risk factors that can contribute to a reduction in the rate of return for the international oil company. Our cash flow models resemble the cash flow of buy-back service contracts before the Iranian government changed the way it determined the capital cost ceiling and pre-defined the oil price in these contracts in 2008–2009. Our actual and contractual cash flow models reveal that Shell Exploration's actual ROR was much lower than the contractual level. Furthermore, we find that among the risk factors that we considered, a capital cost overrun has the greatest negative effect on the IOC's ROR. Moreover, we show that there is a potential for modifying the contracts in order for the IOC to face an actual ROR closer to the contractual ROR even if the contract faces cost overrun or delay, without exceeding the maximum contractual ROR that the National Iranian Oil Company is willing to give. - Highlights: • Buy-back contract specific risk factors can reduce the rate of return. • Shell Exploration's actual ROR was much lower than the contractual level. • A capital cost overrun has the greatest negative effect on the rate of return. • Contracts can be modified to better share the risk.

  16. Identification and assessment of risk factors affecting construction projects

    Directory of Open Access Journals (Sweden)

    Mohamed Sayed Bassiony Ahmed Abd El-Karim

    2017-08-01

    Unexpected increase in cost and delays in construction projects are caused by owner, contractor, environments, etc. in which several types of risk factors may occur concurrently. The effect of cost overrun and schedule overrun do not only influence the construction industry but the overall economy as well. Even though construction project increasing in cost and schedule has received extensive attention of researchers, but because of continuous changes and development in the field, the study considered of added value to the construction industry in Egypt, in addition to risk strategy and plan analysis. In order to meet the deadline of a project and due to the complex nature of construction projects, cost and scheduling should be flexible enough to accommodate changes without negatively affecting the overall project cost and duration. As such, the objectives of the presented research in this paper are to identify, study, and assess the effect of the factors that affect cost and time contingency. Data are collected from sixteen construction companies in Egypt. The collected data, output charts and analyses spreadsheets will be used for the development of computerized model built by the authors with identification abbreviation RIAM.

  17. Risk management in public sector construction projects: Case ...

    African Journals Online (AJOL)

    a project environment. Since projects are complicated, experience ... work, delays trigger cost overruns in construction projects (African. Development Bank ..... quantity surveying, contract management, and engineering. Table 4: Research ..... professionals at the business and operational levels of construction management.

  18. Variability of Cost and Time Delivery of Educational Buildings in Nigeria

    Directory of Open Access Journals (Sweden)

    Aghimien, Douglas Omoregie

    2017-09-01

    Full Text Available Cost and time overrun in construction projects has become a reoccurring problem in construction industries around the world especially in developing countries. This situation is unhealthy for public educational buildings which are executed with limited government funds, and are in most cases time sensitive, as they need to cater for the influx of students into the institutions. This study therefore assessed the variability of cost and time delivery of educational buildings in Nigeria, using a study of selected educational buildings within the country. A pro forma was used to gather cost and time data on selected building projects, while structured questionnaire was used to harness information on the possible measures for reducing the variability from the construction participants that were involved in the delivery of these projects. Paired sample t-test, percentage, relative importance index, and Kruskal-Walis test were adopted for data analyses. The study reveals that there is a significant difference between the initial and final cost of delivering educational buildings, as an average of 4.87% deviation, with a sig. p-value of 0.000 was experienced on all assessed projects. For time delivery, there is also a significant difference between the initial estimated time and final time of construction as a whopping 130% averaged deviation with a sig. p-value of 0.000 was discovered. To remedy these problems, the study revealed that prompt payment for executed works, predicting market price fluctuation and inculcating it into the initial estimate, and owner’s involvement at the planning and design phase are some of the possible measures to be adopted.

  19. Empirical Study of the Serverity of Loss and Expense Claims on ...

    African Journals Online (AJOL)

    Claims for loss and /or expense is characteristic of most building contracts in Nigeria irrespective of their size and scope; and often defeats project objectives of time, cost and functionality by leading to their time and cost overrun. This study aims at minimizing the negative effect of loss and /or expense claims by providing an ...

  20. Construction delays causing risks on time and cost - a critical review

    Directory of Open Access Journals (Sweden)

    Chidambaram Ramanathan

    2012-02-01

    Full Text Available There is an increase in the number of construction projects experiencing extensive delays leading to exceeding initial time and cost budget.  This paper reviews 41 studies around the world which surveyed the delay factors and classified them into Groups.  The main purpose of this paper is to review literature, each of which have categorized the causes that are responsible for time delays and cost overrun in projects. The collected list has 113 causes for delays categorized in to 18 different groups.  Most of the researches have analysed the responses from the Questionnaire survey.    The collected data are used to rank the problem.  The data are further used to investigate and analyse Important Index, Frequency Index, Severity Index, Relative Important Index, Relative Importance Weight, Weighted Average, Mean, Standard Deviation and Variance.  The collective comparison has revealed that the ranking given by all the researchers is not the same.  Further each and every study has different rank ratings for the different group of the delays.  This review paper attempts to provide an updated compilation of the earlier studies on ranking of the delay causers, which are never similar and constant for universal projects.  It is concluded that a separate study is required for identifying the factors causing delay for projects operated in Sabah, East Malaysia.

  1. Analyzing asset management data using data and text mining.

    Science.gov (United States)

    2014-07-01

    Predictive models using text from a sample competitively bid California highway projects have been used to predict a construction : projects likely level of cost overrun. A text description of the project and the text of the five largest project line...

  2. Cost Control Guide For Decommissioning Of Nuclear Installations

    International Nuclear Information System (INIS)

    2013-01-01

    (less than EUR 20 million) and large (EUR multi-billion) projects successfully. The level of success depends on the commitment to excellence. The objective of this guide is to provide a practical, user-friendly approach to implementing cost controls for major decommissioning programmes to minimise project budget and schedule over-runs. The guide establishes the framework for structuring a programme for preparing cost controls, training, certifying and using cost controls through an earned value management system (EVMS)

  3. Integrating the Acquisition Team. Proceedings of the Conference Held in Arlington, Virginia on July 14-16, 1986.

    Science.gov (United States)

    1986-07-16

    organism, the Packard Commission concluded that the " horror stories" of overpriced spare parts, test deficiencies, and cost and schedule overruns were...the impact of Gramm-Rudman-Hollings budget deficit reductions. o Whenever and wherever possible, evalute the use of non- developmental items (NDI

  4. Does Lean & Agile Project Management Help Coping with Project Complexity?

    NARCIS (Netherlands)

    Jalali Sohi, A.; Hertogh, M.J.C.M.; Bosch-Rekveldt, M.G.C.; Blom, R.; Serpell, A.; Ferrada, X.

    2016-01-01

    Still, projects in the construction sector are delivered with time delays and cost overruns. One of the reasons for poor performance was assigned to project complexity. A combination of lean construction and agile project management are hypothesized as a possible solution to cope with project

  5. Livermore blasted for project delay

    CERN Multimedia

    1999-01-01

    In a 12 page report issued last week, a review committee set up by the University of California has concluded that mismanagement and poor planning are to blame for significant cost overruns and delays in the construction of NIF, the worlds largest laser (1 page).

  6. Is 2010 the Year Army Acquisitions Turned the Corner to Affordability

    Science.gov (United States)

    2017-12-01

    enacted as public law on May 22, 2009. The goal of the legislation, summarized by President Obama will limit cost overruns before they spiral out...mention that one Navy program that did complete a should cost analysis benefited from the newly acquired knowledge by negotiating a 4.5% reduction on a...the cost analysis requirements description indicates that a sole source contract for EMD will be pursued negating any benefits from competition (DOD

  7. Acquisition Review Quarterly (ARQ): Volume 1, Number 1, Winter 1994

    Science.gov (United States)

    1994-01-01

    OH. Horngren , C. T., & Foster, G. (1991). Cost Accounting , a Managerial Emphasis (7th ed.). Englewood Cliffs, NJ. Moniison, D. C. (1901, March). Deep...1), or are predicted to occur for the duration of their cost account ( s ) as planned on Work Package Planning Sheets (WPPS). The Narrative Variance...in dealing with similar business situations. Research 19- COST OVERRUN OPTIMISM: Fact or Fiction Major David S . Christensen, USAF "Wheii idken to

  8. Causes of project implementation delay in the Ethiopian Electric ...

    African Journals Online (AJOL)

    This study identifies the major sources of delay in the implementation of construction projects in the Ethiopian electric utility enterprise. It also investigates the magnitude of schedule variance and cost overrun experienced by the Universal Electric Access Program (UEAP)due to implementation delay. Primary data were ...

  9. Navigating mega projects through complexity and uncertainty: strategic and adaptive capacity in planning and decision-making

    NARCIS (Netherlands)

    Giezen, M.

    2012-01-01

    Over the last few decades, there has been an increasing interest in mega projects from both policy makers and academics. Of particular concern to both has been the seemingly structural time and cost overruns associated with these projects. In response a tendency, especially of policy makers, has

  10. CERN opens finances up for review

    CERN Multimedia

    2001-01-01

    CERN will appoint an external review board to assess future financing needs through to 2012 for both the LHC and the lab as a whole. The action has been prompted by the funding crisis resulting from the cost overruns of the LHC project (1/2 page).

  11. Cost-benefit analysis of nZEB energy efficiency strategies with on-site photovoltaic generation

    International Nuclear Information System (INIS)

    Pikas, Ergo; Kurnitski, Jarek; Thalfeldt, Martin; Koskela, Lauri

    2017-01-01

    Many studies on the deployment of and investment in renewable energy (RE) technologies have focused on job creation associated with energy production at the macroeconomic level and across renewable energy technologies. We propose another perspective, the use of solar photovoltaic (PV) technology to attain a nearly zero-energy building (nZEB) class. The aim of this research is to investigate the costs and benefits for private and public entities when constructing nZEB or adopting nZEB policies. A quantitative research approach is taken when modelling required PV capacities, net present cash flows, subsidies, and job generation. Findings show that at current electricity tariffs and solar PV system capacities and production levels, single family houses, apartment buildings, and other building types require 0.044 €/kWh, 0.037 €/kWh, and 0.024 €/kWh, respectively, in government subsidies on energy sold back to the grid. Office buildings were profitable without the subsidy. In this study, we argue that investments in RE, specifically, PV technology, will bring in approximately 2.1 M€ of additional revenue to the Estonian government over a 20 years period as tax return overruns subsidies. However, nZEB investments are expected to become cost-optimal without subsidies, due to the increasing efficiency and decreasing costs of PV systems. - Highlights: • The paper provides a combination of approaches for PV cost-benefit analysis. • Investments in PV technology to obtain nZEB require government subsidies. • Work describes potential strategies for subsidizing or investing in PV technology. • Investments in PV technology benefit both private investors and public institutions.

  12. What We Know about Software Test Maturity and Test Process Improvement

    NARCIS (Netherlands)

    Garousi, Vahid; Felderer, Michael; Hacaloglu, Tuna

    2018-01-01

    In many companies, software testing practices and processes are far from mature and are usually conducted in an ad hoc fashion. Such immature practices lead to negative outcomes - for example, testing that doesn't detect all the defects or that incurs cost and schedule overruns. To conduct test

  13. Evaluating the Cost, Safety, and Proliferation Risks of Small Floating Nuclear Reactors.

    Science.gov (United States)

    Ford, Michael J; Abdulla, Ahmed; Morgan, M Granger

    2017-11-01

    It is hard to see how our energy system can be decarbonized if the world abandons nuclear power, but equally hard to introduce the technology in nonnuclear energy states. This is especially true in countries with limited technical, institutional, and regulatory capabilities, where safety and proliferation concerns are acute. Given the need to achieve serious emissions mitigation by mid-century, and the multidecadal effort required to develop robust nuclear governance institutions, we must look to other models that might facilitate nuclear plant deployment while mitigating the technology's risks. One such deployment paradigm is the build-own-operate-return model. Because returning small land-based reactors containing spent fuel is infeasible, we evaluate the cost, safety, and proliferation risks of a system in which small modular reactors are manufactured in a factory, and then deployed to a customer nation on a floating platform. This floating small modular reactor would be owned and operated by a single entity and returned unopened to the developed state for refueling. We developed a decision model that allows for a comparison of floating and land-based alternatives considering key International Atomic Energy Agency plant-siting criteria. Abandoning onsite refueling is beneficial, and floating reactors built in a central facility can potentially reduce the risk of cost overruns and the consequences of accidents. However, if the floating platform must be built to military-grade specifications, then the cost would be much higher than a land-based system. The analysis tool presented is flexible, and can assist planners in determining the scope of risks and uncertainty associated with different deployment options. © 2017 Society for Risk Analysis.

  14. Predicting Freeway Work Zone Delays and Costs with a Hybrid Machine-Learning Model

    Directory of Open Access Journals (Sweden)

    Bo Du

    2017-01-01

    Full Text Available A hybrid machine-learning model, integrating an artificial neural network (ANN and a support vector machine (SVM model, is developed to predict spatiotemporal delays, subject to road geometry, number of lane closures, and work zone duration in different periods of a day and in the days of a week. The model is very user friendly, allowing the least inputs from the users. With that the delays caused by a work zone on any location of a New Jersey freeway can be predicted. To this end, tremendous amounts of data from different sources were collected to establish the relationship between the model inputs and outputs. A comparative analysis was conducted, and results indicate that the proposed model outperforms others in terms of the least root mean square error (RMSE. The proposed hybrid model can be used to calculate contractor penalty in terms of cost overruns as well as incentive reward schedule in case of early work competition. Additionally, it can assist work zone planners in determining the best start and end times of a work zone for developing and evaluating traffic mitigation and management plans.

  15. Pemodelan Peningkatan Akurasi Estimasi Biaya Dengan Metode Structural Equation Modeling-Partial Least Square Pada Proyek Jalan Provinsi Kalimantan Tengah

    Directory of Open Access Journals (Sweden)

    Yanda Christian

    2018-01-01

    Full Text Available Acceleration of national development increases the number of construction projects in Indonesia, including road projects. The contractor as the service provider in the implementation of the construction work shall have a detailed implementation schedule and project cost budget plan so that the construction work shall not be subject to delays and cost overrun. The main thing that can cause cost overrun is the error in cost estimation. In this study discusses the modeling of increasing the accuracy of cost estimation as well as the development of factors that can improve the accuracy of cost estimation. Validation of research variables was done to experts using Analytical Hierarchy Process (AHP method and modeling using Structural Equation ModelingPartial Least Square (SEM-PLS method to project contractor of Public Works Department of Central Kalimantan Province and National Road Implementation Center XI Unit Work of Central Kalimantan with contract value of project worth 20 Billion to 50 Billion Rupiah Year 2016. The result of variable validation shows the competence variable of estimator, survey, availability of information, calculation of cost estimation and internal company is variable which influence estimation The obtained modeling equation is AEB = 0,129 KE + 0.466 S + 0,191 KI + 0,153 PEB + 0,069 IP + 0,181 ζ. The development of cost estimation is done by improving each influential indicator in each variable and applying development strategies to increase the estimated cost estimation based on SWOT analysis. Keywords : Analytical Hierarchy Process (AHP, cost estimation, road, Structural Equation Modeling-Partial Least Square (SEM-PLS, SWOT analysis.

  16. The true costs of nuclear power

    International Nuclear Information System (INIS)

    Wallner, A.; Mraz, G.

    2013-01-01

    Worldwide, many nuclear power plants will be reaching the end of their lifetimes over the next few years. States must therefore decide now on the direction they intend to steer their energy policies. Possible options are the construction of new nuclear power plants, extending the lifetime of existing ones, or changing direction towards a sustainable energy future. Arguments put forward by the nuclear power lobby in favour of new builds are, on the one hand, the claim that nuclear power is low in CO2 emissions,1and on the other, that it is low cost. This paper examines the second claim and identifies the “true costs of nuclear power”. This paper provides an overview for the general reader and presents the most important aspects of “costs of nuclear power”, as well as sound information to contribute to discussions of this complex issue. The first part of this paper focuses on the costs of nuclear new-build: Approximately two thirds of electricity generation costs consist of fixed costs, the largest part of which covers the construction of the nuclear power plant (NPP) itself, including the interest rates (capital costs). Consequently, construction costs are a crucial factor in the overall cost of nuclear power. The issue of nuclear new build is currently under discussion in many states in Europe which are considering replacing their aged nuclear power plant fleet, e.g. UK (Hinkley Point and further plans for new builds), Finland (Olkiluoto 3), France (Flamanville 3), the Czech Republic (Temelin 3/4), Slovakia (Mochovce 3/4) and Romania (Cernavoda 3/4). Those projects have one crucial point in common: problems with costs or financing. The Massachusetts Institute of Technology (MIT) has calculated that construction costs rose 15% per annum from 2003 to 2009; construction costs rose from 2,000 to 4,000 USD, amounting to total construction costs of US$ 4 billion for a 1,000 MW NPP. A current example of cost and construction time overrun is the Finnish reactor

  17. A best value approach (BVA) to supplier selection : A case study of best value procurement (BVP) in the Norwegian construction industry

    OpenAIRE

    Hamre, Linda; Borén, Sara

    2017-01-01

    Masteroppgave(MSc) in Master of Science in Business, Logistics, operations and supply chain management - Handelshøyskolen BI, 2017 It is a well-known fact that the construction industry has long been struggling with project cost and duration overruns, quality, and safety measures. It is characterized as conservative with low-bid contracting which has led to conflicts, delays, and unexpected additional costs. These issues clearly identify the need for a shift towards a more holi...

  18. Navy Shipbuilding: Need to Document Rationale for the Use of Fixed-Price Incentive Contracts and Study Effectiveness of Added Incentives

    Science.gov (United States)

    2017-03-01

    share line and 120 percent ceiling price should be the norm , or starting point.8 The Director of Defense Pricing stated that he believes DOD’s...constructing nuclear submarines. We previously reported that this is in contrast to commercial ship buyers, who have an array of yards and suppliers to...overrun up until costs reached a specified point, with the government’s maximum liability capped at the ceiling price. Cost increases above target

  19. Understanding cost growth during operations of planetary missions: An explanation of changes

    Science.gov (United States)

    McNeill, J. F.; Chapman, E. L.; Sklar, M. E.

    In the development of project cost estimates for interplanetary missions, considerable focus is generally given to the development of cost estimates for the development of ground, flight, and launch systems, i.e., Phases B, C, and D. Depending on the project team, efforts expended to develop cost estimates for operations (Phase E) may be relatively less rigorous than that devoted to estimates for ground and flight systems development. Furthermore, the project team may be challenged to develop a solid estimate of operations cost in the early stages of mission development, e.g., Concept Study Report or Systems Requirement Review (CSR/SRR), Preliminary Design Review (PDR), as mission specific peculiarities that impact cost may not be well understood. In addition, a methodology generally used to develop Phase E cost is engineering build-up, also known as “ grass roots” . Phase E can include cost and schedule risks that are not anticipated at the time of the major milestone reviews prior to launch. If not incorporated into the engineering build-up cost method for Phase E, this may translate into an estimation of the complexity of operations and overall cost estimates that are not mature and at worse, insufficient. As a result, projects may find themselves with thin reserves during cruise and on-orbit operations or project overruns prior to the end of mission. This paper examines a set of interplanetary missions in an effort to better understand the reasons for cost and staffing growth in Phase E. The method used in the study is discussed as well as the major findings summarized as the Phase E Explanation of Change (EoC). Research for the study entailed the review of project materials, including Estimates at Completion (EAC) for Phase E and staffing profiles, major project milestone reviews, e.g., CSR, PDR, Critical Design Review (CDR), the interviewing of select project and mission management, and review of Phase E replan materials. From this work, a detai- ed

  20. Design definition study of a NASA/Navy lift/cruise fan technology V/STOL airplane: Risk assessment addendum to the final report

    Science.gov (United States)

    Zabinsky, J. M.; Burnham, R. W.; Flora, C. C.; Gotlieb, P.; Grande, D. L.; Gunnarson, D. W.; Howard, W. M.; Hunt, D.; Jakubowski, G. W.; Johnson, P. E.

    1975-01-01

    An assessment of risk, in terms of delivery delays, cost overrun, and performance achievement, associated with the V/STOL technology airplane is presented. The risk is discussed in terms of weight, structure, aerodynamics, propulsion, mechanical drive, and flight controls. The analysis ensures that risks associated with the design and development of the airplane will be eliminated in the course of the program and a useful technology airplane that meets the predicted cost, schedule, and performance can be produced.

  1. GE PETtrace RF power failures related to poor power quality

    OpenAIRE

    Bender, B. R.; Erdahl, C. E.; Dick, D. W.

    2015-01-01

    Introduction Anyone who has ever overseen the installation of a new cyclotron is aware of the importance of addressing the numerous vendor-supplied site specifications prior to its arrival. If the site is not adequately prepared, the facility may face project cost overruns, poor cyclotron performance and unintended maintenance costs. Once a facility has identified the space, providing sufficient power is the next step. Every cyclotron vendor will provide you with a set of power specificati...

  2. JSF: JOINT STRIKE FIGHTER OR JUST SIMPLE FAILURE ANALYZING THE F-35S JOINT ACQUISITION MODEL

    Science.gov (United States)

    2016-02-01

    due to its substantial budget overruns,2 and the Army was one of several branches to have an aircraft program cut due to similar cost runaways.3 With...to Congressional Subcommittee on Tactical Air and Land Forces, April, 2015. 16 Shalal-esa, Andrea. “US Navy Pledges Cost Cuts as it Christens New... stranger to controversy—it suffered from setbacks in testing, was over budget, and behind schedule.23 The Air Force eventually received just over half of

  3. The dynamic of modern software development project management and the software crisis of quality. An integrated system dynamics approach towards software quality improvement

    OpenAIRE

    Nasirikaljahi, Armindokht

    2012-01-01

    The software industry is plagued by cost-overruns, delays, poor customer satisfaction and quality issues that are costing clients and customers world-wide billions of dollars each year. The phenomenon is coined The Software Crisis", and poses a huge challenge for software project management. This thesis addresses one of the core issues of the software crisis, namely software quality. The challenges of software quality are central for understanding the other symptoms of the software crisis. Th...

  4. Project Robot: A Software Simulation for Systems Engineering Education

    Science.gov (United States)

    Arnold, Ross D.; Wade, Jon P.

    2017-01-01

    The U.S. defense industry spends billions of dollars each year developing defense systems to keep the nation and allies secure. However, the failure rate of system development is notoriously high. Even when development efforts do succeed, they often do so with cost overruns and compromises in system performance. As a result, large amounts of money…

  5. 30 CFR 885.16 - After OSM approves my grant, what responsibilities do I have?

    Science.gov (United States)

    2010-07-01

    ... expend any funds until we have ensured that all necessary actions have been taken by you and us to ensure compliance with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321 et seq.) and any other... continuation grant or to enter into any grant revision, including grant increases to cover cost overruns. ...

  6. Rate shock's ''day after'': bailout or bankruptcy

    International Nuclear Information System (INIS)

    Nogee, A.

    1984-01-01

    Utility regulators must decide whether to allow a bailout for utilities with unfinished or cancelled plants, but there may be financial and regulatory obstacles to non-utility financing. New investors may want take-or-pay contracts, or contractors may agree to complete plants at a fixed cost. The problem for ratepayers is that bailouts allow utilities to complete uneconomical plants. Citizens are fighting back against high rate increases in several state legislatures, which are considering a variety of initiatives to deal with cost recovery, construction work in progress, cancellations, and cost overruns

  7. Supply Chain Management in Flyover Projects in India

    Directory of Open Access Journals (Sweden)

    Sudhir Yadav

    2015-01-01

    Full Text Available This paper explores the application of supply chain management (SCM in the Indian construction industry. The authors studied the SCM practices followed in flyover projects and compared them with the seamless SCM model for construction proposed by a previous study. A case study approach was followed for the research work. Structured interviews were conducted to understand the SCM practices in flyover projects in India. The developed model advocates leading roles for client and strategic needs analysis and value management study that are missing in the studied projects. All of the projects studied faced cost and time overruns. The seamless SCM model may be extended to developing countries by incorporating requirements related to the long-term relationship between project agents and, if possible, by suggesting that clients should not select agents using only the minimal cost criteria. The extended model also proposes SCM training for all project agents before the start of the project. Strategic needs analysis and value management study should be an integral part of the construction project to improve project efficiency. Implementing the seamless SCM model calls for the early involvement (i.e., at the project design stage of all project agents. Project sponsors can apply the findings of this study to manage time and cost overruns.

  8. Use of virtual environments to reduce the construction costs of the next generation nuclear power reactors

    International Nuclear Information System (INIS)

    Whisker, V.E.; Baratta, A.J.

    2007-01-01

    The near term deployment of the next generation of reactors will only be successful if they are built on time and without the costly overruns experienced in the previous generation. One critical factor in achieving these goals is to ensure the design is optimized for constructability. In this work the authors explored the effectiveness of full-scale virtual reality simulation in the optimization of the design and construction of the next generation of nuclear reactors. The research tested the suitability of immersive virtual reality display technology in aiding engineers in evaluating potential cost reductions that can be realized by the optimization of design and installation and construction sequences. The intent of this research is to see if this type of technology can be used in capacities similar to those currently filled by full-scale physical mockups and desktop simulations. Using a fully-immersive five sided virtual reality system, known as a CAVE, the authors constructed a series of virtual mockups that represented two next generation nuclear power plants, the Westinghouse AP-1000 and the Pebble Bed Modular Reactor (PBMR). These virtual mockups were then tested as a design tool to help locate and correct problem areas, to optimize the construction sequence, and to assist with familiarizing trades people with the performance of maintenance activities. A series of experiments were performed to assess the usefulness of these virtual mockups in accomplishing these tasks. (authors)

  9. COSTMODL - AN AUTOMATED SOFTWARE DEVELOPMENT COST ESTIMATION TOOL

    Science.gov (United States)

    Roush, G. B.

    1994-01-01

    The cost of developing computer software consumes an increasing portion of many organizations' budgets. As this trend continues, the capability to estimate the effort and schedule required to develop a candidate software product becomes increasingly important. COSTMODL is an automated software development estimation tool which fulfills this need. Assimilating COSTMODL to any organization's particular environment can yield significant reduction in the risk of cost overruns and failed projects. This user-customization capability is unmatched by any other available estimation tool. COSTMODL accepts a description of a software product to be developed and computes estimates of the effort required to produce it, the calendar schedule required, and the distribution of effort and staffing as a function of the defined set of development life-cycle phases. This is accomplished by the five cost estimation algorithms incorporated into COSTMODL: the NASA-developed KISS model; the Basic, Intermediate, and Ada COCOMO models; and the Incremental Development model. This choice affords the user the ability to handle project complexities ranging from small, relatively simple projects to very large projects. Unique to COSTMODL is the ability to redefine the life-cycle phases of development and the capability to display a graphic representation of the optimum organizational structure required to develop the subject project, along with required staffing levels and skills. The program is menu-driven and mouse sensitive with an extensive context-sensitive help system that makes it possible for a new user to easily install and operate the program and to learn the fundamentals of cost estimation without having prior training or separate documentation. The implementation of these functions, along with the customization feature, into one program makes COSTMODL unique within the industry. COSTMODL was written for IBM PC compatibles, and it requires Turbo Pascal 5.0 or later and Turbo

  10. Renewable energy alternatives to mega hydropower: a case study of Inga 3 for Southern Africa

    Science.gov (United States)

    Deshmukh, R.; Mileva, A.; Wu, G. C.

    2018-06-01

    We assess the feasibility and cost-effectiveness of renewable energy alternatives to Inga 3, a 4.8-GW hydropower project on the Congo River, to serve the energy needs of the host country, the Democratic Republic of Congo (DRC), and the main buyer, South Africa. To account for a key uncertainty in the literature regarding the additional economic impacts of managing variable wind and solar electricity, we built a spatially and temporally detailed power system investment model for South Africa. We find that a mix of wind, solar photovoltaics, and some natural gas is more cost-effective than Inga 3 to meet future demand except in scenarios with pessimistic assumptions about wind technology performance. If a low load growth forecast is used, including Inga 3 in the power mix results in higher system cost across all sensitivities. In our scenarios, the effect of Inga 3 deployment on South African power system cost ranges from an increase of ZAR 4300 (US 330) million annually to savings of ZAR 1600 (US 120) million annually by 2035. A cost overrun as low as 20% makes the Inga 3 scenarios more expensive in all sensitivity cases. Including time and cost overruns and losses in transmission from DRC to South Africa make Inga 3 an even less attractive investment. For DRC, through analysis of spatial datasets representing technical, physical, and environmental constraints, we find abundant renewable energy potential: 60 GW of solar photovoltaic and 0.6–2.3 GW of wind located close to transmission infrastructure have levelized costs less than US 0.07 per kWh, or the anticipated cost of Inga 3 to residential consumers.

  11. Stakeholders Assessment of Constraints to Project Delivery in the Nigerian Construction Industry

    Directory of Open Access Journals (Sweden)

    Bruno L. Tanko

    2017-01-01

    Full Text Available The central goal of construction stakeholders is to successfully deliver projects to stated objective (s. However, for decades, construction projects have been plagued by perennial constraints of cost and time overruns, poor quality, and lack of sustainability. The objective of this paper is to identify and assess the constraints to construction project delivery, and to recommend solutions to enhance project performance. This paper adopted both quantitative and qualitative methods to establish the constraints in the Nigerian construction industry. A pilot survey and literature reviewed revealed a total of fifty (50 construction constraints, which were further classified into eight (8 major groups. Well-structured questionnaires were administered to construction stakeholders (client, consultant and contractor in Abuja, the federal capital city of Nigeria. Relative Importance Index (RII was used to analyze the data using Likert scale.  The results suggest that cost/time overrun related factors (inability to reduce project cost, Stakeholders interactive-related factors (inability to establish client value system, Client-related factors (Delay in interim payment and finance problem, and Labor/material-related factors (escalation of material prices and materials quality variability are the most prevalent constraints in the Nigerian construction environment.  To mitigate the effects of these challenges, it is suggested that a formal innovative approach should be used by stakeholders to address the problems of poor communication, high project cost, and delay. Clients should also take measures to provide adequate funding and should promptly honor interim certificates.

  12. A Bridge Too Far: The Demise of the Superconducting Super Collider

    CERN Multimedia

    CERN. Geneva

    2016-01-01

    A combination of fiscal austerity, continuing SSC cost overruns, intense Congressional scrutiny, lack of major foreign contributions, waning Presidential support, and the widespread public perception of mismanagement led to the project’s demise nearly five years after it had begun. Its termination occurred against the political backdrop of changing scientific needs as US science policy shifted to a post-Cold War footing during the early 1990s. And the growing cost of the SSC inevitably exerted undue pressure upon other worthy research, thus weakening its support in Congress and the bro...

  13. The New Line Copenhagen-Ringsted: the benefits from EU railway benchmarking

    DEFF Research Database (Denmark)

    Trabo, Inara; Landex, Alex; Schneider-Tilli, J.E.

    2012-01-01

    Companies in many different business areas face unexpected budget overruns when carrying out large-scale projects. Usually this happens because of underestimation of actual costs during budgeting. That is why it is important to have specific knowledge of the market situation, not only in one...... specific country, but also outside the country’s borders. It helps, for example, to find relevant information about construction materials to lower prices and reducing a project’s planned costs by several per cent. The same is true of technology and the companies involved in the construction of the project...

  14. Probabilistic analysis of modernization options

    International Nuclear Information System (INIS)

    Wunderlich, W.O.; Giles, J.E.

    1991-01-01

    This paper reports on benefit-cost analysis for hydropower operations, a standard procedure for reaching planning decisions. Cost overruns and benefit shortfalls are also common occurrences. One reason for the difficulty of predicting future benefits and costs is that they usually cannot be represented with sufficient reliability by accurate values, because of the many uncertainties that enter the analysis through assumptions on inputs and system parameters. Therefore, ranges of variables need to be analyzed instead of single values. As a consequence, the decision criteria, such as net benefit and benefit-cost ratio, also vary over some range. A probabilistic approach will be demonstrated as a tool for assessing the reliability of the results

  15. Capability challenges of facility management (FM) personnel toward sustainability agenda

    Science.gov (United States)

    Halim, Ahmad Ilyas Ahmad; Sarpin, Norliana; Kasim, Narimah Binti; Zainal, Rozlin Binti

    2017-10-01

    The industries business play a significant role to contribute toward economic growth in develop and developing country. However, they always face serious problems such as time overrun, waste generation, and cost overrun during their operation and maintenance. Traditional practice is found unable to control that situation. These challenges accent the need for practitioners to rethink and improve their process management. This show that industries business has major potential when applying sustainable development by focusing on three pillars (economic, environment, and social). By adopting sustainability, it can reduce energy consumption and waste, while increasing productivity, financial return and corporate standing in community. FM personnel are most suitable position to lead organizations toward sustainability implementation. However, lack of skill and capability among FM personnel to achieve sustainable goal had become barrier that need to overcome. This paper focus to identify capability challenges of FM personnel toward sustainability. A multiple researches were conducted and data were gathered through literature review from previous studies.

  16. A road map for implementing systems engineering

    Energy Technology Data Exchange (ETDEWEB)

    Dean, F.F. [Sandia National Labs., Albuquerque, NM (United States). New Mexico Weapons Systems Engineering Center; Bentz, B.; Bahill, A.T. [Univ. of Arizona, Tucson, AZ (United States)

    1997-02-01

    Studies by academia, industry, and government indicate that applying a sound systems engineering process to development programs is an important tool for preventing cost and schedule overruns and performance deficiencies. There is an enormous body of systems engineering knowledge. Where does one start? How can the principles of systems engineering be applied in the Sandia environment? This road map is intended to be an aid to answering these questions.

  17. L'ideologia della "Grandi Opere" come fattore di sviluppo

    OpenAIRE

    Ponti Marco; Brambilla Marco

    2006-01-01

    The paper presents a series of arguments and elaborations questioning the present Italian political attitude of seeing large civil works, specially within the transport sector, as indispensable public expenditures for objectives of economic development. In particular it is presented the rather dismal record of large transport projects worldwide, where cost overruns and unachieved traffic forecast dominate, specially so in railways. A summary of the past Italian planning documents and actions ...

  18. Critical Causes and Consequences of Construction Project Interruption: Client, Contractor, Consultant and External Factors Standpoints

    Directory of Open Access Journals (Sweden)

    Nurbasirah Mohamed Alias

    2013-09-01

    Full Text Available It should be pointed out that the dilemma of interruption and stoppage in the construction industry is a large-scale trend. Construction interruption and stoppage is considered one of the most recurring problems in the construction industry. Construction Interruption and stoppage is always measured as costly to all parties concerned in the projects and very often it will result in clash, claims, total desertion and much difficult for the feasibility and it slows the growth of construction sector. The objective of the research work that underpins this paper was to investigate the Factors and Consequences of construction projects on local contractors. A construction project is commonly acknowledged as successful when the aim of the project is achieved in terms of predetermined objectives that are mainly completed the project on time, within budget and specified quality in accordance with the specifications and to stakeholders’ satisfaction. One of the most important problems that may arise in the construction project is delays and the magnitude of these delays varies considerably from project to project. According to delay categories that were contractor related, client related, consultant related, labour related and external related, the study revealed the six major effects of delay that were time overrun, cost overrun, dispute, arbitration, total abandonment, and litigation.

  19. Requirements: Towards an understanding on why software projects fail

    Science.gov (United States)

    Hussain, Azham; Mkpojiogu, Emmanuel O. C.

    2016-08-01

    Requirement engineering is at the foundation of every successful software project. There are many reasons for software project failures; however, poorly engineered requirements process contributes immensely to the reason why software projects fail. Software project failure is usually costly and risky and could also be life threatening. Projects that undermine requirements engineering suffer or are likely to suffer from failures, challenges and other attending risks. The cost of project failures and overruns when estimated is very huge. Furthermore, software project failures or overruns pose a challenge in today's competitive market environment. It affects the company's image, goodwill, and revenue drive and decreases the perceived satisfaction of customers and clients. In this paper, requirements engineering was discussed. Its role in software projects success was elaborated. The place of software requirements process in relation to software project failure was explored and examined. Also, project success and failure factors were also discussed with emphasis placed on requirements factors as they play a major role in software projects' challenges, successes and failures. The paper relied on secondary data and empirical statistics to explore and examine factors responsible for the successes, challenges and failures of software projects in large, medium and small scaled software companies.

  20. Re-engineering software systems in the Department of Defense using integrated computer aided software engineering tools

    OpenAIRE

    Jennings, Charles A.

    1992-01-01

    Approved for public release; distribution is unlimited The Department of Defense (DoD) is plagues with severe cost overruns and delays in developing software systems. Existing software within Dod, some developed 15-to 20 years ago, require continual maintenance and modification. Major difficulties arise with maintaining older systems due to cryptic source code and a lack of adequate documentation. To remedy this situation, the DoD, is pursuing the integrated computer aided software engi...

  1. A Proactive Approach for Change Management and Control on Construction Projects

    OpenAIRE

    CHEN, CHAO

    2015-01-01

    Changes on construction projects present tough and controversial issues. Change is one of the primary reasons for schedule delay and cost overrun, which create negative impact on project performance and profitability. The liability of change and its consequences are major sources of disagreements between project participants, which often lead to disputes or claims.To answer the challenge of change, both industry and academia have developed change management techniques. Many studies have touch...

  2. Utilization of information and communications technology (ICT) to improve workface efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Haines, A.; Rasmussen, J. [Industrial Audit Corp., Toronto, Ontario (Canada)

    2010-07-01

    Improving the efficiency of personnel at the workface is a key objective for executing construction, maintenance, quality, engineering and human performance activities. Schedule and cost overruns have a significant impact on the bottom line and on future business efficiency in execution of tasks is paramount to success. Leveraging information and communications technology (ICT) in construction, maintenance and operation environments can create a mobile workforce where personnel efficiency is improved, significant gains are made on schedule and cost, and the overall quality of work is raised. This paper will discuss the impact of mobile technology specifically on workface efficiency and productivity. (author)

  3. Utilization of information and communications technology (ICT) to improve workface efficiency

    International Nuclear Information System (INIS)

    Haines, A.; Rasmussen, J.

    2010-01-01

    Improving the efficiency of personnel at the workface is a key objective for executing construction, maintenance, quality, engineering and human performance activities. Schedule and cost overruns have a significant impact on the bottom line and on future business efficiency in execution of tasks is paramount to success. Leveraging information and communications technology (ICT) in construction, maintenance and operation environments can create a mobile workforce where personnel efficiency is improved, significant gains are made on schedule and cost, and the overall quality of work is raised. This paper will discuss the impact of mobile technology specifically on workface efficiency and productivity. (author)

  4. Aircraft performance in slippery runway conditions : a simulation study of the accuracy and limitations of real-time runway friction estimation based on airplane onboard data.

    Science.gov (United States)

    2015-04-01

    Runway overrun accidents occurring during landings in slippery conditions continue to occur frequently worldwide. After a : number of specific landing overrun accidents in the U.S., the National Transportation Safety Board (NTSB) issued a safety : re...

  5. The devil to pay: a cost of mutualism with Myrmelachista schumanni ants in ‘devil's gardens’ is increased herbivory on Duroia hirsuta trees

    Science.gov (United States)

    Frederickson, Megan E; Gordon, Deborah M

    2007-01-01

    ‘Devil's gardens’ are nearly pure stands of the myrmecophyte, Duroia hirsuta, that occur in Amazonian rainforests. Devil's gardens are created by Myrmelachista schumanni ants, which nest in D. hirsuta trees and kill other plants using formic acid as an herbicide. Here, we show that this ant–plant mutualism has an associated cost; by making devil's gardens, M. schumanni increases herbivory on D. hirsuta. We measured standing leaf herbivory on D. hirsuta trees and found that they sustain higher herbivory inside than outside devil's gardens. We also measured the rate of herbivory on nursery-grown D. hirsuta saplings planted inside and outside devil's gardens in ant-exclusion and control treatments. We found that when we excluded ants, herbivory on D. hirsuta was higher inside than outside devil's gardens. These results suggest that devil's gardens are a concentrated resource for herbivores. Myrmelachista schumanni workers defend D. hirsuta against herbivores, but do not fully counterbalance the high herbivore pressure in devil's gardens. We suggest that high herbivory may limit the spread of devil's gardens, possibly explaining why devil's gardens do not overrun Amazonian rainforests. PMID:17301016

  6. The Significance of Coordination for Industrialised Building System (IBS) Precast Concrete in Construction Industry

    OpenAIRE

    Fitri Othman Mohd Khairul; Wan Muhammad Wan Mohd Nurdden; Abd Hadi Nurulhudaya; Azman Mohd Azrai

    2017-01-01

    IBS precast concrete is construction system which is meant to improve the conventional construction process. However IBS precast concrete projects are suffering from serious problems such as cost overrun, delays and less quality of the end product. The absence of coordination is perceived as the reason for this issue. The purpose of this paper is to review the significance of coordination for IBS precast concrete in the construction industry. It if found that the fragmentation which occurs in...

  7. Levelised unit electricity cost comparison of alternate technologies for baseload generation in Ontario

    International Nuclear Information System (INIS)

    Ayres, M.; McRae, M.; Stogran, M.

    2004-08-01

    rate of return required for projects is subject to some uncertainty. For a merchant project the higher the perceived risk the higher the required return. Publicly financed projects may be evaluated on the basis of a given discount rate or may be able to access funds at lower rates, but the risk of cost overruns is implicitly borne by the taxpayer. There is a third possibility, a public/private partnership. A number of partnership arrangements are possible, for example, public financing of construction and leasing to private owners for operation. All partnership arrangements represent a sharing of risk between the public and private sector. Public/private partnership may provide an attractive model for building new generation in Ontario. This report considers each of the generation options under both merchant and public financing. The base case merchant financing scenario is consistent with one where risk is relatively low, and consequently the real return on equity required by private investors is 12%. We believe a comparison between merchant and public financing to be important in that it shows the effect of taxes and financing assumptions on the economics of a generation project. Since the pure economic assessment of projects does not normally consider financing or tax costs, these being transfer payments not essential to the project itself, the public financing version of our assessments can be interpreted as the underlying economics of different technologies. This report does not include a detailed modelling of financing arrangements that could occur under a public/private partnership. However, we do consider how the cost of generation options compares under a wide range of illustrative assumptions on the required return on equity, debt and the debt/equity ratio. (author)

  8. Nuclear science: Information on DOE accelerators should be better disclosed in the budget

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    GAO estimated the total cost of six of the Department of Energy's largest accelerator projects to be about $6.9 billion. DOE has identified only about $0.6 billion of these project-specific costs in the budget. This is because DOE's definition of a project relates only to construction, which excludes certain project-specific components and preconstruction research and development. In addition, DOE funds a project in stages over a number of years and does not, when the first stage is authorized, identify for the Congress the total cost of completing the project. DOE also does not fully disclose in its budget technical uncertainties associated with the performance of certain accelerator components because its internal operating procedures do not require such disclosure. This could result in cost overruns or increased operating costs.

  9. Bonneville Power Administration: financial fallout from termination of WPPSS nuclear projects 4 and 5. Oversight hearings before the Subcommittee on Mining, Forest Management, and Bonneville Power Administration of the Committee on Interior and Insular Affairs, House of Representatives, Ninety-Eighth Congress, First Session, February 14 and 15, 1983

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Peter T. Johnson, Administrator of the Bonneville Power Administration, and a representative of the Washington Public Power Supply System (WPPSS) described the financial situation resulting from the cancellations and cost overruns of WPPSS nuclear projects that have left the area with an unacceptable debt. Four panels representing area utilities and electric cooperatives described their financial positions on the second day of hearings. Two appendices with additional material from Bonneville, WPPSS, the Department of the Interior, and others follow the testimony

  10. Is it still an energy option in the US

    International Nuclear Information System (INIS)

    Weaver, L.E.

    1984-01-01

    Questions regarding nuclear power as a viable energy source in the future of the US are discussed. Successful, economical production of electricity in the past is contrasted with dramatic cost overruns, delays, and quality assurance problems of today. Long term issues include: reactor licensing and regulations, nuclear waste management, economics, public opinion, and demand. Problems that would be faced if nuclear power were to fade away temporarily and then be needed in the 21st century, lack of technical expertise and educational facilities, etc., are discussed

  11. Fault Management Guiding Principles

    Science.gov (United States)

    Newhouse, Marilyn E.; Friberg, Kenneth H.; Fesq, Lorraine; Barley, Bryan

    2011-01-01

    Regardless of the mission type: deep space or low Earth orbit, robotic or human spaceflight, Fault Management (FM) is a critical aspect of NASA space missions. As the complexity of space missions grows, the complexity of supporting FM systems increase in turn. Data on recent NASA missions show that development of FM capabilities is a common driver for significant cost overruns late in the project development cycle. Efforts to understand the drivers behind these cost overruns, spearheaded by NASA's Science Mission Directorate (SMD), indicate that they are primarily caused by the growing complexity of FM systems and the lack of maturity of FM as an engineering discipline. NASA can and does develop FM systems that effectively protect mission functionality and assets. The cost growth results from a lack of FM planning and emphasis by project management, as well the maturity of FM as an engineering discipline, which lags behind the maturity of other engineering disciplines. As a step towards controlling the cost growth associated with FM development, SMD has commissioned a multi-institution team to develop a practitioner's handbook representing best practices for the end-to-end processes involved in engineering FM systems. While currently concentrating primarily on FM for science missions, the expectation is that this handbook will grow into a NASA-wide handbook, serving as a companion to the NASA Systems Engineering Handbook. This paper presents a snapshot of the principles that have been identified to guide FM development from cradle to grave. The principles range from considerations for integrating FM into the project and SE organizational structure, the relationship between FM designs and mission risk, and the use of the various tools of FM (e.g., redundancy) to meet the FM goal of protecting mission functionality and assets.

  12. Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

    Energy Technology Data Exchange (ETDEWEB)

    Hulett, David T. [Hulett and Associates, LLC (United States); Nosbisch, Michael R. [Project Time and Cost, Inc. (United States)

    2012-07-01

    course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)

  13. Reducing Risk in DoD Software-Intensive Systems Development

    Science.gov (United States)

    2016-03-01

    schedule overruns, impacting modernization timetables and reducing funding for other developmental priorities. This research is a continuation and...Postgraduate School and an undergraduate degree in economics from Weber State University. He is a graduate of the Command and General Staff College...overruns, impacting modernization timetables and reducing funding for other developmental priorities. This research is a continuation and

  14. Attribute Hierarchy of Conflicts in Construction Projects: A Case Study of Sindh

    Directory of Open Access Journals (Sweden)

    Shabbir Hussain Khahro

    2015-10-01

    Full Text Available Conflicts seem to arise throughout the life cycle of the construction project and in result, these may lead to several other issues such as project cost overrun, time overrun, productivity loss, loss of profit and above all damage of business relationships in general and specifically in construction industry. Hence, this paper focuses on various direct and indirect causes leading to conflicts in construction industry of Sindh, Pakistan. Detailed literature review and interviews have been carried out to identify several direct and indirect causes of conflicts and finally, a set of questionnaire has been designed and distributed to get expert opinion on the significance of these causes in this sector. The data has been analyzed by RIW (Relative Importance Weight method. The outcome of this study shows that payment delay is the major direct cause of conflicts in the construction projects followed by contractual claims, public interruption, poor communication and site conditions. Thus, it is suggested that proper attention should be given to the above mentioned concerns so as to have a uniform flow of construction project life cycle without any interruption.

  15. Applying lean thinking to risk management in product development

    DEFF Research Database (Denmark)

    Willumsen, Pelle Lundquist; Oehmen, Josef; Rossi, Monica

    2017-01-01

    This paper re-conceptualizes risk management (RM) in product development (PD) through a lean thinking perspective. Arguably, risk management in PD projects became a victim of its own success. It is often implemented as a highly formalized, compliance driven activity, ending up disconnected from...... delay or cost overrun. This paper explores the relationship between product development and risk management and proposes to make RM an integrated value adding part of PD. Through a literature review we identify the potential of re-conceptualizing RM through lean thinking. We then conceptualize...

  16. Levelised unit electricity cost comparison of alternate technologies for baseload generation in Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Ayres, M.; McRae, M.; Stogran, M.

    2004-08-15

    constrained to provide a rate of return. The rate of return required for projects is subject to some uncertainty. For a merchant project the higher the perceived risk the higher the required return. Publicly financed projects may be evaluated on the basis of a given discount rate or may be able to access funds at lower rates, but the risk of cost overruns is implicitly borne by the taxpayer. There is a third possibility, a public/private partnership. A number of partnership arrangements are possible, for example, public financing of construction and leasing to private owners for operation. All partnership arrangements represent a sharing of risk between the public and private sector. Public/private partnership may provide an attractive model for building new generation in Ontario. This report considers each of the generation options under both merchant and public financing. The base case merchant financing scenario is consistent with one where risk is relatively low, and consequently the real return on equity required by private investors is 12%. We believe a comparison between merchant and public financing to be important in that it shows the effect of taxes and financing assumptions on the economics of a generation project. Since the pure economic assessment of projects does not normally consider financing or tax costs, these being transfer payments not essential to the project itself, the public financing version of our assessments can be interpreted as the underlying economics of different technologies. This report does not include a detailed modelling of financing arrangements that could occur under a public/private partnership. However, we do consider how the cost of generation options compares under a wide range of illustrative assumptions on the required return on equity, debt and the debt/equity ratio. (author)

  17. NASA Spacecraft Fault Management Workshop Results

    Science.gov (United States)

    Newhouse, Marilyn; McDougal, John; Barley, Bryan; Fesq, Lorraine; Stephens, Karen

    2010-01-01

    Fault Management is a critical aspect of deep-space missions. For the purposes of this paper, fault management is defined as the ability of a system to detect, isolate, and mitigate events that impact, or have the potential to impact, nominal mission operations. The fault management capabilities are commonly distributed across flight and ground subsystems, impacting hardware, software, and mission operations designs. The National Aeronautics and Space Administration (NASA) Discovery & New Frontiers (D&NF) Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns due to underestimating the complexity and support requirements for fault management. As a result of this and other recent experiences, the NASA Science Mission Directorate (SMD) Planetary Science Division (PSD) commissioned a workshop to bring together invited participants across government, industry, academia to assess the state of the art in fault management practice and research, identify current and potential issues, and make recommendations for addressing these issues. The workshop was held in New Orleans in April of 2008. The workshop concluded that fault management is not being limited by technology, but rather by a lack of emphasis and discipline in both the engineering and programmatic dimensions. Some of the areas cited in the findings include different, conflicting, and changing institutional goals and risk postures; unclear ownership of end-to-end fault management engineering; inadequate understanding of the impact of mission-level requirements on fault management complexity; and practices, processes, and

  18. Nuclear waste disposal: achieving adequate financing - special study

    International Nuclear Information System (INIS)

    Quasebarth, M.V.

    1984-01-01

    An analysis by the Congressional Budget Office (CBO) evaluates whether the current one mill fee now charged to nuclear-electricity consumers will adequately finance the waste disposal program. The CBO found that, if the fee is adjusted annually for inflation, it should provide enough revenues to cover all program costs under all nuclear growth forecasts. If the fee is unchanged, however, the fees will be inadequate if inflation exceeds 3% annually. The report suggests two alternatives for fee revision, but makes no recommendations. The alternatives are to increase the fee only at specific intervals or to automatically adjust the fee through indexation. The report examines the effect of delaying the program, cost overruns, and alternative inflation rate and interest rate assumptions. 3 figures, 12 tables

  19. How 60 Minutes ticked off Illinois Power

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    A November 60 Minutes broadcast on CBS television asserting that costs are out of control at the Illinois Power Co's(IP) Clinton nuclear power project because of management incompetence triggered a series of rebuttals and counter-rebuttals. A review of the events and correspondence during the planning stage and after the broadcast explores the question of construction cost overruns and the economic impact the broadcast had on IP's investors, employees, and customers. A parallel filming by IP was aired to show how the CBS edited the interview with IP officials. IP personnel feel betrayed by what they consider misconceptions and errors in the broadcast and are unhappy that an employee morale problem was worsened. Counter-arguments by both parties indicate a disagreement on both facts and interpretations

  20. Analisis Pengendalian Risiko Terhadap Peningkatan Kinerja Pekerjaan Konstruksi (Studi Kasus Asrama Haji Gorontalo

    Directory of Open Access Journals (Sweden)

    Evan Kusuma Wijaya

    2018-01-01

    Full Text Available A good construction management can support the acceleration of the infrastructure construction and a low performance in implementation of the construction projects will lead to delay and cost overrun. This paper is intended to identify the risk factors which affect to performance of construction project. Gorontalo Hajj Dormitory construction project are not completed within the estimated scheduled and cost. Data in this research were collected through questionnaires from stakeholders. Regression model of an analysis result then simulated with Monte Carlo method and the variables in this model are the most dominant risk factor which influence on a performance. The most dominant risk for cost and schedule performance is bad condition during construction, incorrect of implementation methods, rework and equipment failure. The cost and schedule performance of the construction work are in poor condition. Generated statistical model is aligned with Earn Value Method and can be apply on the field. Keywords: Earned Value Analysis, Monte Carlo simulation, Risk analysis.

  1. Leadership Quality for Malaysia Construction Leader to Steer a Success Construction Project

    Directory of Open Access Journals (Sweden)

    Ngah Nasaruddin Nur Ain

    2016-01-01

    Full Text Available Issues that dominate the construction industry for the long time such as time overrun, cost overrun, quality of construction and also safety during the construction process are difficult to resolve because of several factors involved which amongst them are leadership quality in the industry. Solving these issues can make the industry more sustainable in nature. This paper presents the need of leadership quality among construction parties involved to steer a construction project successfully. Literature work found that 11 leadership qualities to ensure construction project success. From the frequency analysis, five most dominant leadership qualities are team building, communication skill, visioning, planning & strategy skill, and decision making. Beside the literature, this study also seeks an opinion from a senior leader of a successful construction company regarding the need of these qualities amongst parties to resolve the construction issues. The results from an interview session indicate that he fully agreed with the need of all the qualities in the construction industry. This shows that there is a strong relationship between solving the issues with the leadership quality in ensuring construction project success. These qualities should be further investigated to acquire a better representation of leadership quality in resolving construction issues for Malaysia construction industry.

  2. Status of the USA Liquid Metal Past Breeder Program, April 1975

    Energy Technology Data Exchange (ETDEWEB)

    Wensch, G. W.

    1975-07-15

    This report was prepared for the Eigth Annual Meeting of the International Working Group on Fast Reactors of the International Atomic Energy Agency. It is a summary of the major projects and activities of the U.S. high priority LMFBR program and should permit the reader to obtain some Insight Into this large, complex, government-industrial undertaking. It is an undertaking that is gaining momentum in scope and drive as the industrial capability of the U.S. becomes more deeply Involved In the program, both as potential customers and manufacturers. The human factor, too, cannot be ignored as more skilled resources have become experienced in sodium reactors technology and are contributing by helping to provide the requisite trained manpower. As the program continues in furthering the required technology, new problems have become identified and defined and means of their resolution planned. Some of the problems as well as achievements are described in this report. The unstable financial situation has contributed to problems in the development of the LMFBR. Cost over-runs on the FFTF and CRBR (Demonstration Plant) and in the entire program have impressed upon us the need for Improved management. We are strengthening the management of the program to avoid future over-runs and delays which have plagued the program.

  3. Status of the USA Liquid Metal Past Breeder Program, April 1975

    International Nuclear Information System (INIS)

    Wensch, G.W.

    1975-01-01

    This report was prepared for the Eigth Annual Meeting of the International Working Group on Fast Reactors of the International Atomic Energy Agency. It is a summary of the major projects and activities of the U.S. high priority LMFBR program and should permit the reader to obtain some Insight Into this large, complex, government-industrial undertaking. It is an undertaking that is gaining momentum in scope and drive as the industrial capability of the U.S. becomes more deeply Involved In the program, both as potential customers and manufacturers. The human factor, too, cannot be ignored as more skilled resources have become experienced in sodium reactors technology and are contributing by helping to provide the requisite trained manpower. As the program continues in furthering the required technology, new problems have become identified and defined and means of their resolution planned. Some of the problems as well as achievements are described in this report. The unstable financial situation has contributed to problems in the development of the LMFBR. Cost over-runs on the FFTF and CRBR (Demonstration Plant) and in the entire program have impressed upon us the need for Improved management. We are strengthening the management of the program to avoid future over-runs and delays which have plagued the program

  4. COST MEASUREMENT AND COST MANAGEMENT IN TARGET COSTING

    Directory of Open Access Journals (Sweden)

    Moisello Anna Maria

    2012-07-01

    Full Text Available Firms are coping with a competitive scenario characterized by quick changes produced by internationalization, concentration, restructuring, technological innovation processes and financial market crisis. On the one hand market enlargement have increased the number and the segmentation of customers and have raised the number of competitors, on the other hand technological innovation has reduced product life cycle. So firms have to adjust their management models to this scenario, pursuing customer satisfaction and respecting cost constraints. In a context where price is a variable fixed by the market, firms have to switch from the cost measurement logic to the cost management one, adopting target costing methodology. The target costing process is a price driven, customer oriented profit planning and cost management system. It works, in a cross functional way, from the design stage throughout all the product life cycle and it involves the entire value chain. The process implementation needs a costing methodology consistent with the cost management logic. The aim of the paper is to focus on Activity Based Costing (ABC application to target costing process. So: -it analyzes target costing logic and phases, basing on a literary review, in order to highlight the costing needs related to this process; -it shows, through a numerical example, how to structure a flexible ABC model – characterized by the separation between variable, fixed in the short and fixed costs - that effectively supports target costing process in the cost measurement phase (drifting cost determination and in the target cost alignment; -it points out the effectiveness of the Activity Based Costing as a model of cost measurement applicable to the supplier choice and as a support for supply cost management which have an important role in target costing process. The activity based information allows a firm to optimize the supplier choice by following the method of minimizing the

  5. Advanced construction methods for new nuclear power plants

    International Nuclear Information System (INIS)

    Bilbao y Leon, Sama; Cleveland, John; Moon, Seong-Gyun; Tyobeka, Bismark

    2009-01-01

    The length of the construction and commissioning phases of nuclear power plants have historically been longer than for conventional fossil fuelled plants, often having a record of delays and cost overruns as a result from several factors including legal interventions and revisions of safety regulations. Recent nuclear construction projects however, have shown that long construction periods for nuclear power plants are no longer the norm. While there are several inter-related factors that influence the construction time, the use of advanced construction techniques has contributed significantly to reducing the construction length of recent nuclear projects. (author)

  6. Iran. Nuclear crisis: towards an overrun?

    International Nuclear Information System (INIS)

    Cherief, Hamza

    2012-01-01

    In this article, the author first shows that the Iranian crisis is a failure of the struggle against nuclear proliferation as Iran seems to possess the technical and scientific abilities to produce nuclear weapons on a medium term. He also notices that this crisis is characterised by a deadlock of legal mechanisms of control of the Iranian nuclear programme: despite UN resolutions and sanctions, the IAEA will not be able able to visit Iranian facilities until Iran decides to enter negotiations again, and the decision by the UN of military actions seems not very likely, at least because of the opposition of China and Russia. In the second part, the author analyses the strategic and geopolitical stakes of the Iranian crisis: the will of Iran to become a regional leader and to counterbalance the Israeli nuclear deterrence, differences of regional interests between western countries, domestic evolutions in Iran. According to the author, both parties share a common interest in a smooth crisis recovery

  7. Lack of sensitivity of staffing for 8-hour sessions to standard deviation in daily actual hours of operating room time used for surgeons with long queues.

    Science.gov (United States)

    Pandit, Jaideep J; Dexter, Franklin

    2009-06-01

    At multiple facilities including some in the United Kingdom's National Health Service, the following are features of many surgical-anesthetic teams: i) there is sufficient workload for each operating room (OR) list to almost always be fully scheduled; ii) the workdays are organized such that a single surgeon is assigned to each block of time (usually 8 h); iii) one team is assigned per block; and iv) hardly ever would a team "split" to do cases in more than one OR simultaneously. We used Monte-Carlo simulation using normal and Weibull distributions to estimate the times to complete lists of cases scheduled into such 8 h sessions. For each combination of mean and standard deviation, inefficiencies of use of OR time were determined for 10 h versus 8 h of staffing. When the mean actual hours of OR time used averages standard deviation and relative cost of over-run to under-run. When mean > or = 8 h 50 min, 10 h staffing has higher OR efficiency. For 8 h 25 min standard deviation of 60 min and relative cost of over-run to under-run of 2.0 versus (b) 8 h 48 min for normal, standard deviation of 0 min and relative cost ratio of 1.50. Although the simplest decision rule would be to staff for 8 h if the mean workload is standard deviation 60 min, and relative cost ratio of 2.00, the inefficiency of use of OR time would be 34% larger if staffing were planned for 8 h instead of 10 h. For surgical teams with 8 h sessions, use the following decision rule for anesthesiology and OR nurse staffing. If actual hours of OR time used averages or = 8 h 50 min, plan 10 h staffing. For averages in between, perform the full analysis of McIntosh et al. (Anesth Analg 2006;103:1499-516).

  8. (Super Variable Costing-Throughput Costing)

    OpenAIRE

    Çakıcı, Cemal

    2006-01-01

    (Super Variable Costing-Throughput Costing) The aim of this study is to explain the super-variable costing method which is a new subject in cost and management accounting and to show it’s working practicly.Shortly, super-variable costing can be defined as a costing method which is use only direct material costs in calculate of product costs and treats all costs except these (direct labor and overhead) as periad costs or operating costs.By using super-variable costing method, product costs ar...

  9. The engineer's role in the assurance of quality

    International Nuclear Information System (INIS)

    Reedy, R.F.; Jones, G.B.

    1988-01-01

    The reasons given most frequently for the lack of new nuclear plant construction are many and well documented. The authors of this paper feel that cost is probably the major reason and they point out that cost is greatly impacted by a failure to firmly establish, in an understandable manner, the role of the engineer in the assurance of quality. (In this paper the authors are talking about engineers and engineering responsibility; they are not talking about engineering organizations.) This misunderstanding is associated with the unnecessarily legalistic interpretation of requirements. This has caused unwarranted cost overruns and schedule delays. The cost and delays caused by the trivial concerns can be higher than Dollar 500 million and two years delay for each nuclear power plant. The system which caused the problem can, and must, be corrected. Engineers have allowed the system to replace our technical skills and practical approaches to solving problems, and the engineers must now take the initiative and change this system. The result will be better, more reliable and less costly products. (orig.)

  10. The Addition of Sago Flour in Yoghurt Based on Physical Propeties of Yoghurt Ice Cream

    Directory of Open Access Journals (Sweden)

    Ika Ayu Wijayanti

    2017-02-01

    Full Text Available The purpose of this research was to determine the best concentration of adding sago flour in yoghurt based on viscosity, overrun, melting rate and total solid of yoghurt ice cream. The experiment was designed by Completely Randomized Design (CRD using four treatments were 0 %, 2 %, 4 %, 6 % from volume of fresh milk and four replications. The data were analyzed by using Analysis of Variance (ANOVA and continued by Duncan’s Multiple Range Test (DMRT. Result of this research showed that concentration of adding sago flour in yoghurt gave highly significant difference effect (P<0.01 on viscosity, overrun, melting rate and total solid of yoghurt ice cream. It can be concluded that the adding of sago flour 2% in yoghurt gave the best result with the viscosity was 1750.75 cP, overrun was 25.14%, melting rate was 39.13 minutes/50 g, total solid was 36.20% and gave the best quality of yoghurt ice cream.

  11. Parts Quality Management: Direct Part Marking via Data Matrix Symbols for Mission Assurance

    Science.gov (United States)

    Moss, Chantrice

    2013-01-01

    A United States Government Accountability Office (GAO) review of twelve NASA programs found widespread parts quality problems contributing to significant cost overruns, schedule delays, and reduced system reliability. Direct part-marking with Data Matrix symbols could significantly improve the quality of inventory control and parts lifecycle management. This paper examines the feasibility of using 15 marking technologies for use in future NASA programs. A structural analysis is based on marked material type, operational environment (e.g., ground, suborbital, orbital), durability of marks, ease of operation, reliability, and affordability. A cost-benefits analysis considers marking technology (data plates, label printing, direct part marking) and marking types (two-dimensional machine-readable, human-readable). Previous NASA parts marking efforts and historical cost data are accounted for, including in-house vs. outsourced marking. Some marking methods are still under development. While this paper focuses on NASA programs, results may be applicable to a variety of industrial environments.

  12. Parts Quality Management: Direct Part Marking of Data Matrix Symbol for Mission Assurance

    Science.gov (United States)

    Moss, Chantrice; Chakrabarti, Suman; Scott, David W.

    2013-01-01

    A United States Government Accountability Office (GAO) review of twelve NASA programs found widespread parts quality problems contributing to significant cost overruns, schedule delays, and reduced system reliability. Direct part marking with Data Matrix symbols could significantly improve the quality of inventory control and parts lifecycle management. This paper examines the feasibility of using direct part marking technologies for use in future NASA programs. A structural analysis is based on marked material type, operational environment (e.g., ground, suborbital, Low Earth Orbit), durability of marks, ease of operation, reliability, and affordability. A cost-benefits analysis considers marking technology (label printing, data plates, and direct part marking) and marking types (two-dimensional machine-readable, human-readable). Previous NASA parts marking efforts and historical cost data are accounted for, including inhouse vs. outsourced marking. Some marking methods are still under development. While this paper focuses on NASA programs, results may be applicable to a variety of industrial environments.

  13. Sensitivity analysis on uncertainty variables affecting the NPP's LUEC with probabilistic approach

    International Nuclear Information System (INIS)

    Nuryanti; Akhmad Hidayatno; Erlinda Muslim

    2013-01-01

    One thing that is quite crucial to be reviewed prior to any investment decision on the nuclear power plant (NPP) project is the calculation of project economic, including calculation of Levelized Unit Electricity Cost (LUEC). Infrastructure projects such as NPP’s project are vulnerable to a number of uncertainty variables. Information on the uncertainty variables which makes LUEC’s value quite sensitive due to the changes of them is necessary in order the cost overrun can be avoided. Therefore this study aimed to do the sensitivity analysis on variables that affect LUEC with probabilistic approaches. This analysis was done by using Monte Carlo technique that simulate the relationship between the uncertainty variables and visible impact on LUEC. The sensitivity analysis result shows the significant changes on LUEC value of AP1000 and OPR due to the sensitivity of investment cost and capacity factors. While LUEC changes due to sensitivity of U 3 O 8 ’s price looks not quite significant. (author)

  14. Forensic imaging for causal investigation of death

    Energy Technology Data Exchange (ETDEWEB)

    Simons, David; Schlemmer, Heinz Peter [German Cancer Research Center (DKFZ), Heidelberg (Germany); Sassenberg, Alina; Yen, Heidelberg [Institute of Forensic Medicine, University of Heidelberg, Heidelberg (Germany)

    2014-04-15

    A 63-year-old man was found in the street after overrun by a car. Postmortem CT revealed multiple bone fractures, but surprisingly all without any relevant hemorrhage which would have been expected under such circumstances. A round radiopaque formation was found in the duodenum, which was reminiscent of ingested tablets. The toxicological analysis revealed high concentrations of zopiclone and alcohol. By combining radiologic and forensic results, zopiclone and alcohol intoxication were concluded as the cause of death, followed by a postmortem overrun accident.

  15. Forensic imaging for causal investigation of death

    International Nuclear Information System (INIS)

    Simons, David; Schlemmer, Heinz Peter; Sassenberg, Alina; Yen, Heidelberg

    2014-01-01

    A 63-year-old man was found in the street after overrun by a car. Postmortem CT revealed multiple bone fractures, but surprisingly all without any relevant hemorrhage which would have been expected under such circumstances. A round radiopaque formation was found in the duodenum, which was reminiscent of ingested tablets. The toxicological analysis revealed high concentrations of zopiclone and alcohol. By combining radiologic and forensic results, zopiclone and alcohol intoxication were concluded as the cause of death, followed by a postmortem overrun accident.

  16. Modelling of risk events with uncertain likelihoods and impacts in large infrastructure projects

    DEFF Research Database (Denmark)

    Schjær-Jacobsen, Hans

    2010-01-01

    to prevent future budget overruns. One of the central ideas is to introduce improved risk management processes and the present paper addresses this particular issue. A relevant cost function in terms of unit prices and quantities is developed and an event impact matrix with uncertain impacts from independent......This paper presents contributions to the mathematical core of risk and uncertainty management in compliance with the principles of New Budgeting laid out in 2008 by the Danish Ministry of Transport to be used in large infrastructure projects. Basically, the new principles are proposed in order...... uncertain risk events is used to calculate the total uncertain risk budget. Cost impacts from the individual risk events on the individual project activities are kept precisely track of in order to comply with the requirements of New Budgeting. Additionally, uncertain likelihoods for the occurrence of risk...

  17. Power system requirements and concepts for a commercially viable lunar base architecture

    Science.gov (United States)

    Lenard, Roger X.; Binder, Alan B.

    1999-01-01

    Historically, space exploration has been the province of governments and major agencies within those governmental entities. Recent advances in the state-of-the-art in many subsystem technology areas and the revealed inadequacies of governments to singlehandedly underwrite major exploration ventures present the potential to expand the venue of space exploration to the commercial sector. Further, major international projects such as the International Space Station have revealed weaknesses in both international financing and management of such projects. Cost overruns are the rule and significant schedule slips and/or failures to deliver have resulted in an enormously costly and delayed program. The exorbitant costs have stymied exploration ventures beyond Earth orbit. There are many potential advantages to a commercial operation including cost, schedule and a distinct customer orientation to services. The objective of this paper is to describe the first phase of a phased strawman commercial lunar base concept which operates as a user facility for governmental entities, corporations and companies. The paper will discuss the power system options and conditions under which such a base can be made to become profitable.

  18. ATLAS for the First Physics Run: Detector and Resources Planning

    CERN Multimedia

    Jenni, P.

    Over the past year not only have we had the pleasure of learning about exciting new physics concepts like signatures for 'extra dimensions', but we have also had to become familiar with less enjoyable matters like 'cost to completion'. Whereas ATLAS will do a great job on the first issue once we have the experiment in place, the second one definitely shows us that we are facing hard times for the coming years until we get the detector up and running. More than a year ago an internal ATLAS Working Group started an evaluation of the resources needed for maintenance and operation (M&O) work already required in the current years before the detector is fully ready for data. The same group also collected first information about cost overruns and items not included in the initial cost evaluation of the detector construction, called internally 'class-2' costs. The Resources Review Board (RRB) was presented with our preliminary estimates for the first time at its April meeting, 2001. Since then a great deal of wo...

  19. KARAKTERISTIK ES KRIM HASIL MODIFIKASI DENGAN FORMULASI BUBUR TIMUN SURI (Cucumis melo L. DAN SARI KEDELAI [Characteristics of Modified Ice Cream Formulated with Cucumis melo L. Puree and Soybean Milk

    Directory of Open Access Journals (Sweden)

    Oksilia

    2012-06-01

    Full Text Available The objective of this research was to observe the physical and chemical characteristics of ice cream made with various formulations of Cucumis melo L. puree and soybean milk. The experiment was designed using Factorial Randomized Block Design with two treatments and each combination was replicated three times. The factors investigated were formulations of Cucumis melo L. puree (10, 12.5 and 15 % and soybean milk (40, 50 and 60%. The ice cream’s viscosity, overrun and melting time were determined, where as protein, fat and potassium content were analyzed. The results showed that the interaction of Cucumis melo L. puree and soybean milk formulation had significant effect on viscosity and overrun. Modified ice cream made with 12.5% Cucumis melo L. puree and 40% soybean milk was the best formula for producing modified ice cream. The resulted ice cream had viscosity of 1.03 cP, overrun 53.93% and melting time 23,58 minutes, while the protein, fat and potassium content were 5.18%, 70% and 1083.33 mg/L, respectively.

  20. Uncertainty Analysis for the Evaluation of a Passive Runway Arresting System

    Science.gov (United States)

    Deloach, Richard; Marlowe, Jill M.; Yager, Thomas J.

    2009-01-01

    This paper considers the stopping distance of an aircraft involved in a runway overrun incident when the runway has been provided with an extension comprised of a material engineered to induce high levels of rolling friction and drag. A formula for stopping distance is derived that is shown to be the product of a known formula for the case of friction without drag, and a dimensionless constant between 0 and 1 that quantifies the further reduction in stopping distance when drag is introduced. This additional quantity, identified as the Drag Reduction Factor, D, is shown to depend on the ratio of drag force to friction force experienced by the aircraft as it enters the overrun area. The specific functional form of D is shown to depend on how drag varies with speed. A detailed uncertainty analysis is presented which reveals how the uncertainty in estimates of stopping distance are influenced by experimental error in the force measurements that are acquired in a typical evaluation experiment conducted to assess candidate overrun materials.

  1. Project of law, adopted by the Senate after urgency declaration, relative to the energy markets and to the energy public utilities; Projet de loi adopte par le Senat apres declaration d'urgence relatif aux marches energetiques et au service public de l'energie

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-10-01

    This project of law treats of: 1 - the right of access to natural gas distribution networks (transit contracts, eligible clients and market opening, acknowledged suppliers, diversification of supplies, denial of contract, derogations); 2 - the transparency and regulation of the natural gas sector (prices and commercial conditions, transport and storage informations, organisation of the regulation authority); 3 - the natural gas public utility (organisation, obligations, supplies warranty and security, national observatory); 4 - the natural gas transport and distribution (network management, expertises and controls, maintenance); 5 - the underground storage (mining law, storage concession, exploitation); 6 - the controls and sanctions; 7 - the dispositions relative to the electric public utility (costs, taxes and contributions, overruns, regulation authority). (J.S.)

  2. Federal securities law and the need to disclose the risk of canceling nuclear plant

    International Nuclear Information System (INIS)

    Sponseller, D.

    1984-01-01

    Almost every electric utility company involved in nuclear plant construction has experienced difficulty as a result of the deteriorating condition of the nuclear industry as a whole. The thrust of a growing number of lawsuits brought against electric companies for alleged violations of federal securities laws is that the companies failed to reveal cost overruns, delays, and the risk of cancellation and write-off of nuclear plants in their annual reports and registration statements. A review of several suits and the disclosure requirements of securities statutes concludes that, although investors have known about utility problems, they have just become aware this year that the entire financial viability of the electric companies is threatened

  3. Small and low head pumped storage projects

    International Nuclear Information System (INIS)

    Makarechian, A.H.

    1991-01-01

    The purpose of this paper is to focus attention on small and low head pumped storage projects. These projects may be defined as having a capacity of less than 200-300 MW and down to about 20 MW, with heads of 1200 ft to about 300 ft or less. Many advantages of these smaller pumped storage projects include more flexibility in siting of a project, considerably shorter licensing and construction period, adaptability to closed system design concept to reduce adverse environmental impacts, considerably reduced risks of delays and substantial cost over-runs, better suited to meeting peaking capacity requirements for individual utilities, and much less transmission inter-connection requirements. An overall licensing and construction schedule of about 3 to 3 1/2 years is realistic for many smaller pumped storage projects, and competitive costs in terms of dollars per kW installed can be achieved

  4. Tunnel visions the rise and fall of the Superconducting Super Collider

    CERN Document Server

    Riordan, Michael; Kolb, Adrienne W

    2015-01-01

    Starting in the 1950s, US physicists dominated the search for elementary particles; aided by the association of this research with national security, they held this position for decades. In an effort to maintain their hegemony and track down the elusive Higgs boson, they convinced President Reagan and Congress to support construction of the multibillion-dollar Superconducting Super Collider project in Texas-the largest basic-science project ever attempted. But after the Cold War ended and the estimated SSC cost surpassed ten billion dollars, Congress terminated the project in October 1993. Drawing on extensive archival research, contemporaneous press accounts, and over one hundred interviews with scientists, engineers, government officials, and others involved, Tunnel Visions tells the riveting story of the aborted SSC project. The authors examine the complex, interrelated causes for its demise, including problems of large-project management, continuing cost overruns, and lack of foreign contributions. In doi...

  5. Costs and cost-effectiveness of periviable care.

    Science.gov (United States)

    Caughey, Aaron B; Burchfield, David J

    2014-02-01

    With increasing concerns regarding rapidly expanding healthcare costs, cost-effectiveness analysis allows assessment of whether marginal gains from new technology are worth the increased costs. Particular methodologic issues related to cost and cost-effectiveness analysis in the area of neonatal and periviable care include how costs are estimated, such as the use of charges and whether long-term costs are included; the challenges of measuring utilities; and whether to use a maternal, neonatal, or dual perspective in such analyses. A number of studies over the past three decades have examined the costs and the cost-effectiveness of neonatal and periviable care. Broadly, while neonatal care is costly, it is also cost effective as it produces both life-years and quality-adjusted life-years (QALYs). However, as the gestational age of the neonate decreases, the costs increase and the cost-effectiveness threshold is harder to achieve. In the periviable range of gestational age (22-24 weeks of gestation), whether the care is cost effective is questionable and is dependent on the perspective. Understanding the methodology and salient issues of cost-effectiveness analysis is critical for researchers, editors, and clinicians to accurately interpret results of the growing body of cost-effectiveness studies related to the care of periviable pregnancies and neonates. Copyright © 2014 Elsevier Inc. All rights reserved.

  6. An Insight Into the Two Costing Technique: Absorption Costing and Marginal Costing

    Directory of Open Access Journals (Sweden)

    Mariam Nawaz

    2013-02-01

    Full Text Available This paper will investigate the controversy that is innate between the two costing techniques; Absorption Costing and Marginal Costing and would throw light on which costing technique better serves its purpose in helping management for decision making process and if Marginal Costing technique is concluded as better technique then why it should not be used for external reporting purpose. This paper will only crystallize and highlight the issues descriptively and will not resolve the issues that are inherent between the two costing techniques. The unique thing about this paper is that it is in favor of treating fixed cost as product cost that is it is supporting the advocates of Absorption Costing Technique but it is against to consider profit as a function of production rather it believes that profit should only be considered as function of sales for stock valuation and to help management in decision making process that is, regarding this point it is supporting advocates of Marginal Costing.

  7. Tax compliance costs: A review of cost burdens and cost structures

    OpenAIRE

    Eichfelder, Sebastian; Vaillancourt, François

    2014-01-01

    Our paper provides a comprehensive report of empirical research on tax compliance costs. Compared to previous reviews, our focus is on average costs for sub-groups (individual taxpayers, small business-es, large businesses) and the composition of the cost burden with regards to different cost components(in-house time effort, external adviser costs, other monetary expenses), different taxes (e.g. income tax, value added tax) and different activities like tax accounting and tax planning. In add...

  8. COSTS CALCULATION OF TARGET COSTING METHOD

    Directory of Open Access Journals (Sweden)

    Sebastian UNGUREANU

    2014-06-01

    Full Text Available Cost information system plays an important role in every organization in the decision making process. An important task of management is ensuring control of the operations, processes, sectors, and not ultimately on costs. Although in achieving the objectives of an organization compete more control systems (production control, quality control, etc., the cost information system is important because monitors results of the other. Detailed analysis of costs, production cost calculation, quantification of losses, estimate the work efficiency provides a solid basis for financial control. Knowledge of the costs is a decisive factor in taking decisions and planning future activities. Managers are concerned about the costs that will appear in the future, their level underpinning the supply and production decisions as well as price policy. An important factor is the efficiency of cost information system in such a way that the information provided by it may be useful for decisions and planning of the work.

  9. THE COST OF PRODUCTION UNDER DIRECT COSTING AND ABSORPTION COSTING – A COMPARATIVE APPROACH

    Directory of Open Access Journals (Sweden)

    Bunea-Bontaş Cristina Aurora

    2013-04-01

    Full Text Available Managerial accounting has an important role in strategic management of a company, being designed especially for managers, in order to optimise their decision regarding operating activities. One of the objectives of managerial accounting is the cost calculation, for measuring inventory costs, and the costs and profitability of products and services. Cost calculation systems can vary in terms of which costs are assigned to cost objects, two significant calculation systems being adopted by the costing theory: full cost accounting, which includes all costs of production as product costs, and partial cost accounting, which includes only those costs that vary with output. This article provides a comparative approach regarding the differences between the calculation of the cost of production under direct costing and absorption costing. It also examines the implication of using each of these calculation systems on the financial position and financial performance of the companies reported on the statement of financial position and the income statement. Finally, the advantages of using direct costing for internal reporting are discussed, considering that this method is not acceptable for external reporting to stockholders and other external users.

  10. Successful integration of fast track projects into turnarounds

    Energy Technology Data Exchange (ETDEWEB)

    Williams, J. Patrick; Loureiro, Ramon C. [KBC Advanced Technologies, Surrey (United Kingdom)

    2012-07-01

    Fast track projects can provide quick wins and competitive advantage. However, in most cases the implementation of these projects requires a shutdown for installing the necessary tie-ins or integration into an upcoming turnaround (TA). Depending on the nature of the project and complexity of the TA, the integration can be seamless or result in cost or duration overruns and safety incidents. The risk of such overruns and safety incidents increases with the amount of project work to be integrated into the operations, maintenance and inspection schedules to be executed during the TA. The risk further increases with TA size and other factors. If not planned and scheduled properly and in a timely fashion, capital projects, in particular fast track projects trying to take advantage of an upcoming TA, can severely impact both TA performance, and the safety and reliability of the facility until the next opportunity for eliminating the defects introduced during the TA. Successful TAs are those delivered in a safe, on time, on budget manner, and with the quality standards needed for a leak-free start-up and a safe and reliable operation over the next run cycle. This paper discusses the key elements that are required to minimize the TA risks derived from the inclusion of fast track projects and how to establish the cut off criteria to either cancel or defer the project, or delay the TA in order to balance TA scope freeze and the case for compelling economics.(author)

  11. Cost, cost-efficiency and cost-effectiveness of integrated family planning and HIV services.

    Science.gov (United States)

    Shade, Starley B; Kevany, Sebastian; Onono, Maricianah; Ochieng, George; Steinfeld, Rachel L; Grossman, Daniel; Newmann, Sara J; Blat, Cinthia; Bukusi, Elizabeth A; Cohen, Craig R

    2013-10-01

    To evaluate costs, cost-efficiency and cost-effectiveness of integration of family planning into HIV services. Integration of family planning services into HIV care and treatment clinics. A cluster-randomized trial. Twelve health facilities in Nyanza, Kenya were randomized to integrate family planning into HIV care and treatment; six health facilities were randomized to (nonintegrated) standard-of-care with separately delivered family planning and HIV services. We assessed costs, cost-efficiency (cost per additional use of more effective family planning), and cost-effectiveness (cost per pregnancy averted) associated with the first year of integration of family planning into HIV care. More effective family planning methods included oral and injectable contraceptives, subdermal implants, intrauterine device, and female and male sterilization. We collected cost data through interviews with study staff and review of financial records to determine costs of service integration. Integration of services was associated with an average marginal cost of $841 per site and $48 per female patient. Average overall and marginal costs of integration were associated with personnel costs [initial ($1003 vs. $872) and refresher ($498 vs. $330) training, mentoring ($1175 vs. $902) and supervision ($1694 vs. $1636)], with fewer resources required for other fixed ($18 vs. $0) and recurring expenses ($471 vs. $287). Integration was associated with a marginal cost of $65 for each additional use of more effective family planning and $1368 for each pregnancy averted. Integration of family planning and HIV services is feasible, inexpensive to implement, and cost-efficient in the Kenyan setting, and thus supports current Kenyan integration policy.

  12. Need of risk management practice amongst bumiputera contractors in Malaysia construction industries

    Science.gov (United States)

    Syuhada Fadzil, Nur; Noor, Nurazuwa Md; Rahman, Ismail Abdul

    2017-11-01

    Malaysia construction industry has been growing continuously with double-digit growth for the past two decades. There are many issues surrounded the industry such as delay in delivery, cost overrun, quality and safety. In bumiputera contractor’s context, the literature review found that 32 issues were encountered in the construction project. These issues can be handled properly with the application of risk management. According to previous researchers, application of risk management in Malaysia construction industry is at the low level where it is implemented in traditional ways that are brainstorming and checklist. These were due to lack of knowledge, the high cost of hiring experts and avoiding extra cost. Besides that, this study also intentions to analyse the risk categories in the construction industry as well as identify risk management process to resolve the construction issues. Hence, this paper presents issues engulfed by Bumiputera contractors which can partly be resolved by applying risk management practice in carrying out the construction activity. This may inspire the contractors to apply the risk management practice in ensuring the success of their construction project.

  13. Construction contracting for the 1990s

    International Nuclear Information System (INIS)

    Kane, C.; Lyon, V.F.

    1991-01-01

    This paper reports that power plant constructing during the 1980s is over. Demand growth projections presently anticipate a need for 100,000 MW of new capacity by the year 2000, with only a small percentage of the demand growth currently under construction. Given a six-year lead time for baseload plants, a surge of activity must now begin. Another development over the past five years has been a conscious decision by regulators in increase rates only for the costs of efficiently built plants. The cost of construction inefficiencies will no longer be shouldered by investors. Large construction claims, excessive cost overruns, and expensive delays will no longer be passed on to the consumer automatically. Utility commissions will require the inefficient builders to either clean up their act or forego building their own plants. The most traditional contracting scheme, general contracting, will probably be the lease desirable in the construction of new power plants. General contracting is a single, general construction contract based on a detailed design. The design is not performed by the general contractor

  14. Design to Cost and Life Cycle Cost.

    Science.gov (United States)

    1980-07-01

    MANAGEMENT TASK ORIENTATED COST STRUCTURE 5. COSTS OF CONSTRUCTION INIFRA 2. COSTS DURING DEVELOPMENT -6. COSTS OF TRAINING 3. COSTS DURING TESi ...de r~duction des coats, ii faut disponer de ?!vyenr. performants d’eetimation des coats en main-d’oeuvre et en applrvininrinesent. Cam moyenm doivent

  15. An Insight Into the Two Costing Technique: Absorption Costing and Marginal Costing

    OpenAIRE

    Mariam Nawaz

    2013-01-01

    This paper will investigate the controversy that is innate between the two costing techniques; Absorption Costing and Marginal Costing and would throw light on which costing technique better serves its purpose in helping management for decision making process and if Marginal Costing technique is concluded as better technique then why it should not be used for external reporting purpose. This paper will only crystallize and highlight the issues descriptively and will not resolve the issues tha...

  16. Optimization of the new formulation of ice cream with native Iranian seed gums (Lepidium perfoliatum and Lepidium sativum) using response surface methodology (RSM).

    Science.gov (United States)

    Azari-Anpar, M; Soltani Tehrani, N; Aghajani, N; Khomeiri, M

    2017-01-01

    In this study, effect of Qodume shahri ( Lepidium perfoliatum ) and cress ( Lepidium sativum ) on rheological properties of ice cream were investigated. The gums were added to the ice cream formulation and different quality attributes including pH, acidity, melting characteristics, viscosity, overrun, texture analysis and sensory evaluation were determined. Results showed that ice cream formulations containing both the gums had improved overrun, melting rate, first dripping time, viscosity, hardness and adhesiveness. The gum concentrations beyond 0.2% level led to a negative effect on gumminess and chewiness of ice cream. Both the gums addition to improved quality attributes and textural properties of ice cream.

  17. Response surface optimization of low-fat ice cream production by using resistant starch and maltodextrin as a fat replacing agent.

    Science.gov (United States)

    Azari-Anpar, Mojtaba; Khomeiri, Morteza; Ghafouri-Oskuei, Hamed; Aghajani, Narjes

    2017-04-01

    In this research, maltodextrin (0, 1 and 2% w/w) and resistant starch (0, 1 and 2% w/w) were used in the formulation of low-fat ice cream (4% fat) and their effects on the physicochemical and sensory properties were investigated. The optimum levels of maltodextrin and resistant starch were determined by response surface methodology. Increment of maltodextrin and resistant starch increased acidity, viscosity, melting rate, time of dripping and overrun but decreased melting rate of ice cream. Results showed that the incorporation of maltodextrin and resistant starch at 0 and 2% w/w respectively, resulted into ice cream with suitable viscosity, melting rate, first dripping time, overrun and acidity.

  18. Meeting the Northwest's Energy Needs Through Competitive Bidding.

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Gilbert A.; Bloomquist, R. Gordon

    1990-07-01

    Utilities have traditionally met load growth requirements through building projects (self-build), purchasing power from other utilities, or from running conservation programs. During the 1980s, alternative capacity expansion approaches were developed. Resources are now also obtained through PURPA-based or competitive bidding acquisition programs. Self-build programs typically involve large-scale hydropower; coal-, natural gas-, and oil-fired projects; and nuclear thermal electric generating projects. Characteristics of these projects, in addition to size, include long lead times, capital intensiveness, substantial environmental impacts, and a significant risk of cost overruns. The risk element became immediately apparent to those investor-owned utilities that, because of decreased load growth, had thermal project investments disallowed in rate cases or were forced to terminate projects. Phrases such as prudent investment,'' used and useful,'' and least-cost planning'' became familiar to the utility industry. Many utilities, once burned, subsequently adopted a policy of never again constructing a base-loaded generating plant. 2 figs.

  19. Fast Missile Boat Project Planning using CPM and What If Analysis Method

    Science.gov (United States)

    Silvianita; Firmansyah, R.; Rosyid, D. M.; Suntoyo; Chamelia, D. M.

    2018-03-01

    This paper discusses analysis of fast ship missile project planning with CPM and What If analysis.The poor performance can cause project delay and cost overruns, these two things often occur in a project management. Scheduling has an important role to control the project. Good scheduling is required because it will affect the product quality. Scheduling is useful to manage the activities so that the project completion time can be as short as possible and it is used to determine the costs of the project are in optimum condition. The alternatives that can be used to overcome the delay project namely increasing labor and equipment.Project planning can be done to determine whether the project is already in an optimum condition. Alternatives that can be used to overcome the delay in the project is to increase labor and equipment, the next is to look for the optimum solution taking into account the duration and gain of each alternative.

  20. Improving hospital cost accounting with activity-based costing.

    Science.gov (United States)

    Chan, Y C

    1993-01-01

    In this article, activity-based costing, an approach that has proved to be an improvement over the conventional costing system in product costing, is introduced. By combining activity-based costing with standard costing, health care administrators can better plan and control the costs of health services provided while ensuring that the organization's bottom line is healthy.

  1. Life cycle cost analysis rehabilitation costs.

    Science.gov (United States)

    2015-07-01

    This study evaluates data from CDOTs Cost Data books and Pavement Management Program. Cost : indices were used to normalize project data to year 2014. Data analyzed in the study was obtained from : the CDOTs Cost Data books and the Pavement Man...

  2. Hidden costs of low-cost screening mammography

    International Nuclear Information System (INIS)

    Cyrlak, D.

    1987-01-01

    Twenty-two hundred women in Orange County, California, took part in a low-cost mammography screening project sponsored by the American Cancer Society and the KCBS-TV. Patients were followed up by telephone and questioned about actual costs incurred as a result of screening mammography, including costs of repeated and follow-up mammograms, US examinations and surgical consultations. The total number of biopsies, cancers found, and the costs involved were investigated. The authors' results suggest that particularly in centers with a high positive call rate, the cost of screening mammograms accounts for only a small proportion of the medical costs

  3. Can a Costly Intervention Be Cost-effective?

    Science.gov (United States)

    Foster, E. Michael; Jones, Damon

    2009-01-01

    Objectives To examine the cost-effectiveness of the Fast Track intervention, a multi-year, multi-component intervention designed to reduce violence among at-risk children. A previous report documented the favorable effect of intervention on the highest-risk group of ninth-graders diagnosed with conduct disorder, as well as self-reported delinquency. The current report addressed the cost-effectiveness of the intervention for these measures of program impact. Design Costs of the intervention were estimated using program budgets. Incremental cost-effectiveness ratios were computed to determine the cost per unit of improvement in the 3 outcomes measured in the 10th year of the study. Results Examination of the total sample showed that the intervention was not cost-effective at likely levels of policymakers' willingness to pay for the key outcomes. Subsequent analysis of those most at risk, however, showed that the intervention likely was cost-effective given specified willingness-to-pay criteria. Conclusions Results indicate that the intervention is cost-effective for the children at highest risk. From a policy standpoint, this finding is encouraging because such children are likely to generate higher costs for society over their lifetimes. However, substantial barriers to cost-effectiveness remain, such as the ability to effectively identify and recruit such higher-risk children in future implementations. PMID:17088509

  4. Health economic studies: an introduction to cost-benefit, cost-effectiveness, and cost-utility analyses.

    Science.gov (United States)

    Angevine, Peter D; Berven, Sigurd

    2014-10-15

    Narrative overview. To provide clinicians with a basic understanding of economic studies, including cost-benefit, cost-effectiveness, and cost-utility analyses. As decisions regarding public health policy, insurance reimbursement, and patient care incorporate factors other than traditional outcomes such as satisfaction or symptom resolution, health economic studies are increasingly prominent in the literature. This trend will likely continue, and it is therefore important for clinicians to have a fundamental understanding of the common types of economic studies and be able to read them critically. In this brief article, the basic concepts of economic studies and the differences between cost-benefit, cost-effectiveness, and cost-utility studies are discussed. An overview of the field of health economic analysis is presented. Cost-benefit, cost-effectiveness, and cost-utility studies all integrate cost and outcome data into a decision analysis model. These different types of studies are distinguished mainly by the way in which outcomes are valued. Obtaining accurate cost data is often difficult and can limit the generalizability of a study. With a basic understanding of health economic analysis, clinicians can be informed consumers of these important studies.

  5. R2/R0-WTR decommissioning cost. Comparison and benchmarking analysis

    International Nuclear Information System (INIS)

    Varley, Geoff; Rusch, Chris

    2001-10-01

    the dismantling activities to determine if they are reasonable. The difference between the R2 estimated total decommissioning cost and the WTR actual total cost is the equivalent of approximately MSEK 85. The analyses presented in this report suggest that up to MSEK 30 of this difference could be related to the process equipment and other active component dismantling. In particular dismantling of the bioshield is singled out for detailed investigation. The final WTR cost turned out to be 25 per cent in excess of the WTR estimate. This may be attributed mainly to: 1. Loss of plant knowledge due to a period of 30 years between shutdown and start of decommissioning combined with the loss of key records concerning the condition of the plant. This was not a major factor but did contribute to additional costs. 2. Assumptions about the extent of concrete contamination and the ability to decontaminate concrete prior to dismantling turned out to be false (est. MSEK10 impact) 3. Unforeseen water treatment was required (est. MSEK12 impact) 4. Inefficiency due to restricted working space was not accounted for correctly (est. MSEK3 impact) 5. Required project management resources were underestimated (est. MSEK13 impact) 6. Health physics hours exceeded expected hours because of the broader requirements of the operations at the Waltz Mill site (est. MSEK5 impact) The items listed above account for close to 80 per cent of the cost overrun (MSEK43 of MSEK55). In principle most of these factors can be avoided in the case of R2 by taking appropriate action in advance. It would however be imprudent not to include some contingency in the R2 estimate to cover unforeseen conditions or implementation difficulties. Based on WTR experience, it would appear that a reasonable contingency for things about which R2 can do little to prepare for in advance, would be in the order of 5 to 10 per cent of the base cost estimate

  6. A practical due diligence strategy for managing the safety of contractors

    International Nuclear Information System (INIS)

    Catton, C.

    1998-01-01

    Ontario Hydro's Fossil Business has developed and implemented a practical program to ensure that the due diligence requirements for contractors are met, particularly in the health and safety area. Companies in the power generation business are hiring contractors to protect their competitive potential by having them perform specialty work outside the core business of generating electricity. The reasons behind this trend, and the need for companies to develop comprehensive contractor safety management systems to avoid legislative liability and cost overruns, and to have contractors work safely, are examined. The main elements of Ontario Hydro's Fossil Business Contractor Safety Management Program (contractor safety policy, contractor safety manual, contractor safety training, and a contractor safety performance database) are discussed. 2 figs., 2 appendices

  7. Understanding the Front-end of Large-scale Engineering Programs

    DEFF Research Database (Denmark)

    Lucae, Sebastian; Rebentisch, Eric; Oehmen, Josef

    2014-01-01

    Large engineering programs like sociotechnical infrastructure constructions of airports, plant constructions, or the development of radically innovative, high-tech industrial products such as electric vehicles or aircraft are affected by a number of serious risks, and subsequently commonly suffer...... from large cost overruns. Significant problems in program execution can be traced back to practices performed, or more frequently not performed, in the so-called “fuzzy front end” of the program. The lack of sufficient and effective efforts in the early stages of a program can result in unstable......, unclear and incomplete requirements, unclear roles and responsibilities within the program organization, insufficient planning, and unproductive tensions between program management and systems engineering. This study intends to clarify the importance of up-front planning to improve program performance...

  8. Nuclear power in the competitive environment

    International Nuclear Information System (INIS)

    Schlissel, D.A.

    1995-01-01

    Nuclear power was originally promoted as being able to produce electricity that would be open-quotes too cheap to meter.close quotes However, large construction cost overruns and rapidly rising operating costs caused many nuclear power plants instead to be very expensive sources of electricity. As a result, many nuclear utilities will face increasing cost pressures in the future competitive environment from lower-cost producers. In fact, the threat to nuclear utilities is so severe that many industry analysts are projecting that more that $70 billion of the utilities' remaining investments in nuclear plants will be open-quotes stranded,close quotes i.e., unrecoverable in the competitive environment. Others in the industry have speculated that many of the 150 major U.S. electric utilities, a large number of which are nuclear, could be swept away by competition, leaving fewer than fifty utilities. This paper will examine how utilities are attempting to improve the cost competitiveness of operating today's nuclear power plants. It will also identify some of the potential consequences of competition for nuclear power and the regulatory role of the U.S. Nuclear Regulatory Commission (NRC). Finally, this paper will address how the changing power markets will affect the prospects for the next generation of nuclear power plants

  9. 77 FR 43542 - Cost Accounting Standards: Cost Accounting Standards 412 and 413-Cost Accounting Standards...

    Science.gov (United States)

    2012-07-25

    ... rule that revised Cost Accounting Standard (CAS) 412, ``Composition and Measurement of Pension Cost... Accounting Standards: Cost Accounting Standards 412 and 413--Cost Accounting Standards Pension Harmonization Rule AGENCY: Cost Accounting Standards Board, Office of Federal Procurement Policy, Office of...

  10. The COST model for calculation of forest operations costs

    NARCIS (Netherlands)

    Ackerman, P.; Belbo, H.; Eliasson, L.; Jong, de J.J.; Lazdins, A.; Lyons, J.

    2014-01-01

    Since the late nineteenth century when high-cost equipment was introduced into forestry there has been a need to calculate the cost of this equipment in more detail with respect to, for example, cost of ownership, cost per hour of production, and cost per production unit. Machine cost calculations

  11. National Variation in Urethroplasty Cost and Predictors of Extreme Cost: A Cost Analysis With Policy Implications.

    Science.gov (United States)

    Harris, Catherine R; Osterberg, E Charles; Sanford, Thomas; Alwaal, Amjad; Gaither, Thomas W; McAninch, Jack W; McCulloch, Charles E; Breyer, Benjamin N

    2016-08-01

    To determine which factors are associated with higher costs of urethroplasty procedure and whether these factors have been increasing over time. Identification of determinants of extreme costs may help reduce cost while maintaining quality. We conducted a retrospective analysis using the 2001-2010 Healthcare Cost and Utilization Project-Nationwide Inpatient Sample (HCUP-NIS). The HCUP-NIS captures hospital charges which we converted to cost using the HCUP cost-to-charge ratio. Log cost linear regression with sensitivity analysis was used to determine variables associated with increased costs. Extreme cost was defined as the top 20th percentile of expenditure, analyzed with logistic regression, and expressed as odds ratios (OR). A total of 2298 urethroplasties were recorded in NIS over the study period. The median (interquartile range) calculated cost was $7321 ($5677-$10,000). Patients with multiple comorbid conditions were associated with extreme costs [OR 1.56, 95% confidence interval (CI) 1.19-2.04, P = .02] compared with patients with no comorbid disease. Inpatient complications raised the odds of extreme costs (OR 3.2, CI 2.14-4.75, P costs (OR 1.78, 95% CI 1.2-2.64, P = .005). Variations in patient age, race, hospital region, bed size, teaching status, payor type, and volume of urethroplasty cases were not associated with extremes of cost. Cost variation for perioperative inpatient urethroplasty procedures is dependent on preoperative patient comorbidities, postoperative complications, and surgical complexity related to graft usage. Procedural cost and cost variation are critical for understanding which aspects of care have the greatest impact on cost. Copyright © 2016 Elsevier Inc. All rights reserved.

  12. PV O&M Cost Model and Cost Reduction

    Energy Technology Data Exchange (ETDEWEB)

    Walker, Andy

    2017-03-15

    This is a presentation on PV O&M cost model and cost reduction for the annual Photovoltaic Reliability Workshop (2017), covering estimating PV O&M costs, polynomial expansion, and implementation of Net Present Value (NPV) and reserve account in cost models.

  13. The cost of preventing undernutrition: cost, cost-efficiency and cost-effectiveness of three cash-based interventions on nutrition outcomes in Dadu, Pakistan.

    Science.gov (United States)

    Trenouth, Lani; Colbourn, Timothy; Fenn, Bridget; Pietzsch, Silke; Myatt, Mark; Puett, Chloe

    2018-07-01

    Cash-based interventions (CBIs) increasingly are being used to deliver humanitarian assistance and there is growing interest in the cost-effectiveness of cash transfers for preventing undernutrition in emergency contexts. The objectives of this study were to assess the costs, cost-efficiency and cost-effectiveness in achieving nutrition outcomes of three CBIs in southern Pakistan: a 'double cash' (DC) transfer, a 'standard cash' (SC) transfer and a 'fresh food voucher' (FFV) transfer. Cash and FFVs were provided to poor households with children aged 6-48 months for 6 months in 2015. The SC and FFV interventions provided $14 monthly and the DC provided $28 monthly. Cost data were collected via institutional accounting records, interviews, programme observation, document review and household survey. Cost-effectiveness was assessed as cost per case of wasting, stunting and disability-adjusted life year (DALY) averted. Beneficiary costs were higher for the cash groups than the voucher group. Net total cost transfer ratios (TCTRs) were estimated as 1.82 for DC, 2.82 for SC and 2.73 for FFV. Yet, despite the higher operational costs, the FFV TCTR was lower than the SC TCTR when incorporating the participation cost to households, demonstrating the relevance of including beneficiary costs in cost-efficiency estimations. The DC intervention achieved a reduction in wasting, at $4865 per case averted; neither the SC nor the FFV interventions reduced wasting. The cost per case of stunting averted was $1290 for DC, $882 for SC and $883 for FFV. The cost per DALY averted was $641 for DC, $434 for SC and $563 for FFV without discounting or age weighting. These interventions are highly cost-effective by international thresholds. While it is debatable whether these resource requirements represent a feasible or sustainable investment given low health expenditures in Pakistan, these findings may provide justification for continuing Pakistan's investment in national social safety

  14. LIFE Cost of Electricity, Capital and Operating Costs

    International Nuclear Information System (INIS)

    Anklam, T.

    2011-01-01

    Successful commercialization of fusion energy requires economic viability as well as technical and scientific feasibility. To assess economic viability, we have conducted a pre-conceptual level evaluation of LIFE economics. Unit costs are estimated from a combination of bottom-up costs estimates, working with representative vendors, and scaled results from previous studies of fission and fusion plants. An integrated process model of a LIFE power plant was developed to integrate and optimize unit costs and calculate top level metrics such as cost of electricity and power plant capital cost. The scope of this activity was the entire power plant site. Separately, a development program to deliver the required specialized equipment has been assembled. Results show that LIFE power plant cost of electricity and plant capital cost compare favorably to estimates for new-build LWR's, coal and gas - particularly if indicative costs of carbon capture and sequestration are accounted for.

  15. National Variation in Urethroplasty Cost and Predictors of Extreme Cost: A Cost Analysis with Policy Implications

    OpenAIRE

    Harris, Catherine R.; Osterberg, E. Charles; Sanford, Thomas; Alwaal, Amjad; Gaither, Thomas W.; McAninch, Jack W.; McCulloch, Charles E.; Breyer, Benjamin N.

    2016-01-01

    To determine which factors are associated with higher costs of urethroplasty procedure and whether these factors have been increasing over time. Identification of determinants of extreme costs may help reduce cost while maintaining quality.We conducted a retrospective analysis using the 2001-2010 Healthcare Cost and Utilization Project-Nationwide Inpatient Sample (HCUP-NIS). The HCUP-NIS captures hospital charges which we converted to cost using the HCUP cost-to-charge ratio. Log cost linear ...

  16. Japanese Cost Accounting Systems - analysis of the cost accounting systems of the Japanese cost accounting standard

    OpenAIRE

    Peter, Winter

    2005-01-01

    This paper aims at providing an insight into Japanese cost accounting. Firstly, the development of cost accounting in Japan is delineated. Subsequently, the cost accounting systems codified in the Japanese cost accounting standard are analysed based on the classification according to Hoitsch/Schmitz. Lastly, a critical appraisal of the cost accounting systems of the Japanese cost accounting standard as well as a comparison to German and American cost accounting systems are conducted.

  17. Wind Integration Cost and Cost-Causation: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Milligan, M.; Kirby, B.; Holttinen, H.; Kiviluoma, J.; Estanqueiro, A.; Martin-Martinez, S.; Gomez-Lazaro, E.; Peneda, I.; Smith, C.

    2013-10-01

    The question of wind integration cost has received much attention in the past several years. The methodological challenges to calculating integration costs are discussed in this paper. There are other sources of integration cost unrelated to wind energy. A performance-based approach would be technology neutral, and would provide price signals for all technology types. However, it is difficult to correctly formulate such an approach. Determining what is and is not an integration cost is challenging. Another problem is the allocation of system costs to one source. Because of significant nonlinearities, this can prove to be impossible to determine in an accurate and objective way.

  18. A Preliminary Investigation into CNO Availability Schedule Overruns

    Science.gov (United States)

    2012-06-01

    days PHNSY Pearl Harbor Naval Shipyard and IMF PIA Planned Incremental Availability PIRA Pre-Inactivated Restricted Availability PNSY Portsmouth...DSRA 6 DEM 2 EOH 6 IA 2 PIA 3 MMP 1 ERO 3 SRA 1 PIRA 2 DMP 1 RCD 2 CM 1 DPIA 2 Table 23. High Level Work Stoppage Data Characteristics 1

  19. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  20. Implementation of lean construction techniques for minimizing the risks effect on project construction time

    Directory of Open Access Journals (Sweden)

    Usama Hamed Issa

    2013-12-01

    Full Text Available The construction projects involve various risk factors which have various impacts on time objective that may lead to time-overrun. This study suggests and applies a new technique for minimizing risk factors effect on time using lean construction principles. The lean construction is implemented in this study using the last planner system through execution of an industrial project in Egypt. Evaluating the effect of using the new tool is described in terms of two measurements: Percent Expected Time-overrun (PET and Percent Plan Completed (PPC. The most important risk factors are identified and assessed, while PET is quantified at the project start and during the project execution using a model for time-overrun quantification. The results showed that total project time is reduced by 15.57% due to decreasing PET values, while PPC values improved. This is due to minimizing and mitigating the effect of most of the risk factors in this project due to implementing lean construction techniques. The results proved that the quantification model is suitable for evaluating the effect of using lean construction techniques. In addition, the results showed that average value of PET due to factors affected by lean techniques represents 67% from PET values due to all minimized risk factors.

  1. Phenotypic plasticity, costs of phenotypes, and costs of plasticity

    DEFF Research Database (Denmark)

    Callahan, Hilary S; Maughan, Heather; Steiner, Uli

    2008-01-01

    Why are some traits constitutive and others inducible? The term costs often appears in work addressing this issue but may be ambiguously defined. This review distinguishes two conceptually distinct types of costs: phenotypic costs and plasticity costs. Phenotypic costs are assessed from patterns...... of covariation, typically between a focal trait and a separate trait relevant to fitness. Plasticity costs, separable from phenotypic costs, are gauged by comparing the fitness of genotypes with equivalent phenotypes within two environments but differing in plasticity and fitness. Subtleties associated with both...... types of costs are illustrated by a body of work addressing predator-induced plasticity. Such subtleties, and potential interplay between the two types of costs, have also been addressed, often in studies involving genetic model organisms. In some instances, investigators have pinpointed the mechanistic...

  2. Controlling Healthcare Costs: Just Cost Effectiveness or "Just" Cost Effectiveness?

    Science.gov (United States)

    Fleck, Leonard M

    2018-04-01

    Meeting healthcare needs is a matter of social justice. Healthcare needs are virtually limitless; however, resources, such as money, for meeting those needs, are limited. How then should we (just and caring citizens and policymakers in such a society) decide which needs must be met as a matter of justice with those limited resources? One reasonable response would be that we should use cost effectiveness as our primary criterion for making those choices. This article argues instead that cost-effectiveness considerations must be constrained by considerations of healthcare justice. The goal of this article will be to provide a preliminary account of how we might distinguish just from unjust or insufficiently just applications of cost-effectiveness analysis to some healthcare rationing problems; specifically, problems related to extraordinarily expensive targeted cancer therapies. Unconstrained compassionate appeals for resources for the medically least well-off cancer patients will be neither just nor cost effective.

  3. Activity-Based Costing: A Cost Management Tool.

    Science.gov (United States)

    Turk, Frederick J.

    1993-01-01

    In college and university administration, overhead costs are often charged to programs indiscriminately, whereas the support activities that underlie those costs remain unanalyzed. It is time for institutions to decrease ineffective use of resources. Activity-based management attributes costs more accurately and can improve efficiency. (MSE)

  4. Cost Behavior

    DEFF Research Database (Denmark)

    Hoffmann, Kira

    The objective of this dissertation is to investigate determinants and consequences of asymmetric cost behavior. Asymmetric cost behavior arises if the change in costs is different for increases in activity compared to equivalent decreases in activity. In this case, costs are termed “sticky......” if the change is less when activity falls than when activity rises, whereas costs are termed “anti-sticky” if the change is more when activity falls than when activity rises. Understanding such cost behavior is especially relevant for decision-makers and financial analysts that rely on accurate cost information...... to facilitate resource planning and earnings forecasting. As such, this dissertation relates to the topic of firm profitability and the interpretation of cost variability. The dissertation consists of three parts that are written in the form of separate academic papers. The following section briefly summarizes...

  5. Systematization of Cost Factors for Cost Management at Industrial Enterprises

    Directory of Open Access Journals (Sweden)

    N. Y.

    2017-12-01

    Full Text Available Identification and structuring of factors determining the cost level has significant importance in cost analysis and control. Cost factors need to be systematized for more effective cost management. The objective of the study is to identify and structure the factors with impact on the enterprise costs. The external and internal factors with impact on the enterprise costs in industry are highlighted. For cost management purposes, it is proposed to group the cost factors into the two categories: structural and functional. The essence of structural and functional factors is shown; a classification of functional factors is given. The effect of a structural factor such as products range (complexity is illustrated. As the factor of complexity, combined with cost analysis systems and innovative tools of analysis (ABC and XYZ methods, has been increasingly in focus of analysts, three problems are described which, once dealt with, will enable ABC method to fit into the cost management system. The importance of another structural factor of costs, technology selection, in cost management is shown. The analysis allows for the following conclusions: for purposes of current cost management, including one based on operational analysis, the output needs to be addressed as the central factor determining the cost level; in the strategic perspective, an enterprise needs to concentrate on calculating the costs for the structural alternatives that are supposed to determine its competitive position; for cost management purposes, the cost factors should be broken into two categories, structural and functional; a specific management system exists for each cost factor, which is greatly important for the positioning of an enterprise.

  6. [Operating cost analysis of anaesthesia: activity based costing (ABC analysis)].

    Science.gov (United States)

    Majstorović, Branislava M; Kastratović, Dragana A; Vučović, Dragan S; Milaković, Branko D; Miličić, Biljana R

    2011-01-01

    Cost of anaesthesiology represent defined measures to determine a precise profile of expenditure estimation of surgical treatment, which is important regarding planning of healthcare activities, prices and budget. In order to determine the actual value of anaestesiological services, we started with the analysis of activity based costing (ABC) analysis. Retrospectively, in 2005 and 2006, we estimated the direct costs of anestesiological services (salaries, drugs, supplying materials and other: analyses and equipment.) of the Institute of Anaesthesia and Resuscitation of the Clinical Centre of Serbia. The group included all anesthetized patients of both sexes and all ages. We compared direct costs with direct expenditure, "each cost object (service or unit)" of the Republican Healthcare Insurance. The Summary data of the Departments of Anaesthesia documented in the database of the Clinical Centre of Serbia. Numerical data were utilized and the numerical data were estimated and analyzed by computer programs Microsoft Office Excel 2003 and SPSS for Windows. We compared using the linear model of direct costs and unit costs of anaesthesiological services from the Costs List of the Republican Healthcare Insurance. Direct costs showed 40% of costs were spent on salaries, (32% on drugs and supplies, and 28% on other costs, such as analyses and equipment. The correlation of the direct costs of anaestesiological services showed a linear correlation with the unit costs of the Republican Healthcare Insurance. During surgery, costs of anaesthesia would increase by 10% the surgical treatment cost of patients. Regarding the actual costs of drugs and supplies, we do not see any possibility of costs reduction. Fixed elements of direct costs provide the possibility of rationalization of resources in anaesthesia.

  7. Phased Array Feeds

    Science.gov (United States)

    Fisher, J. Richard; Bradley, Richard F.; Brisken, Walter F.; Cotton, William D.; Emerson, Darrel T.; Kerr, Anthony R.; Lacasse, Richard J.; Morgan, Matthew A.; Napier, Peter J.; Norrod, Roger D.; Payne, John M.; Pospieszalski, Marian W.; Symmes, Arthur; Thompson, A. Richard; Webber, John C.

    2009-03-01

    This white paper offers cautionary observations about the planning and development of new, large radio astronomy instruments. Complexity is a strong cost driver so every effort should be made to assign differing science requirements to different instruments and probably different sites. The appeal of shared resources is generally not realized in practice and can often be counterproductive. Instrument optimization is much more difficult with longer lists of requirements, and the development process is longer and less efficient. More complex instruments are necessarily further behind the technology state of the art because of longer development times. Including technology R&D in the construction phase of projects is a growing trend that leads to higher risks, cost overruns, schedule delays, and project de-scoping. There are no technology breakthroughs just over the horizon that will suddenly bring down the cost of collecting area. Advances come largely through careful attention to detail in the adoption of new technology provided by industry and the commercial market. Radio astronomy instrumentation has a very bright future, but a vigorous long-term R&D program not tied directly to specific projects needs to be restored, fostered, and preserved.

  8. Large Instrument Development for Radio Astronomy

    Science.gov (United States)

    Fisher, J. Richard; Warnick, Karl F.; Jeffs, Brian D.; Norrod, Roger D.; Lockman, Felix J.; Cordes, James M.; Giovanelli, Riccardo

    2009-03-01

    This white paper offers cautionary observations about the planning and development of new, large radio astronomy instruments. Complexity is a strong cost driver so every effort should be made to assign differing science requirements to different instruments and probably different sites. The appeal of shared resources is generally not realized in practice and can often be counterproductive. Instrument optimization is much more difficult with longer lists of requirements, and the development process is longer and less efficient. More complex instruments are necessarily further behind the technology state of the art because of longer development times. Including technology R&D in the construction phase of projects is a growing trend that leads to higher risks, cost overruns, schedule delays, and project de-scoping. There are no technology breakthroughs just over the horizon that will suddenly bring down the cost of collecting area. Advances come largely through careful attention to detail in the adoption of new technology provided by industry and the commercial market. Radio astronomy instrumentation has a very bright future, but a vigorous long-term R&D program not tied directly to specific projects needs to be restored, fostered, and preserved.

  9. JPL's Approach for Helping Flight Project Managers Meet Today's Management Challenges

    Science.gov (United States)

    Leising, Charles J.

    2004-01-01

    All across NASA project managers are facing tough new challenges. NASA has imposed increased oversight and the number of projects at Centers such as JPL has exploded from a handful of large projects to a much greater number of smaller ones. Experienced personnel are retiring at increasing rates and younger, less experienced managers are being rapidly promoted up the ladder. Budgets are capped, competition among NASA Centers and Federally Funded Research and Development Centers (FFRDCs) has increased significantly and there is no longer any tolerance to cost overruns. On top of all this, implementation schedules have been reduced by 25 to 50% to reduce run-out costs, making it even more difficult to define requirements, validate heritage assumptions and make accurate cost estimates during the early phases of the life-cycle.JPL's executive management, under the leadership of the Associate Director for Flight Projects and Mission Success, have attempted to meet these challenges by improving operations in five areas: (1) increased standardization, where it is judged to have significant benefit; (2) better balance and more effective partnering between projects and the line management; (3) increased infrastructure support; (4) improved management training; and (5) more effective review and oversight.

  10. APPROPRIATE ALLOCATION OF CONTINGENCY USING RISK ANALYSIS METHODOLOGY

    Directory of Open Access Journals (Sweden)

    Andi Andi

    2004-01-01

    Full Text Available Many cost overruns in the world of construction are attributable to either unforeseen events or foreseen events for which uncertainty was not appropriately accommodated. It is argued that a significant improvement to project management performance may result from greater attention to the process of analyzing project risks. The objective of this paper is to propose a risk analysis methodology for appropriate allocation of contingency in project cost estimation. In the first step, project risks will be identified. Influence diagramming technique is employed to identify and to show how the risks affect the project cost elements and also the relationships among the risks themselves. The second step is to assess the project costs with regards to the risks under consideration. Using a linguistic approach, the degree of uncertainty of identified project risks is assessed and quantified. The problem of dependency between risks is taken into consideration during this analysis. For the final step, as the main purpose of this paper, a method for allocating appropriate contingency is presented. Two types of contingencies, i.e. project contingency and management reserve are proposed to accommodate the risks. An illustrative example is presented at the end to show the application of the methodology.

  11. Cost Model for Digital Preservation: Cost of Digital Migration

    DEFF Research Database (Denmark)

    Kejser, Ulla Bøgvad; Nielsen, Anders Bo; Thirifays, Alex

    2011-01-01

    The Danish Ministry of Culture has funded a project to set up a model for costing preservation of digital materials held by national cultural heritage institutions. The overall objective of the project was to increase cost effectiveness of digital preservation activities and to provide a basis...... for comparing and estimating future cost requirements for digital preservation. In this study we describe an activity-based costing methodology for digital preservation based on the Open Archice Information System (OAIS) Reference Model. Within this framework, which we denote the Cost Model for Digital...... Preservation (CMDP), the focus is on costing the functional entity Preservation Planning from the OAIS and digital migration activities. In order to estimate these costs we have identified cost-critical activities by analysing the functions in the OAIS model and the flows between them. The analysis has been...

  12. Cost Model for Digital Preservation: Cost of Digital Migration

    Directory of Open Access Journals (Sweden)

    Ulla Bøgvad Kejser

    2011-03-01

    Full Text Available The Danish Ministry of Culture has funded a project to set up a model for costing preservation of digital materials held by national cultural heritage institutions. The overall objective of the project was to increase cost effectiveness of digital preservation activities and to provide a basis for comparing and estimating future cost requirements for digital preservation. In this study we describe an activity-based costing methodology for digital preservation based on the Open Archice Information System (OAIS Reference Model. Within this framework, which we denote the Cost Model for Digital Preservation (CMDP, the focus is on costing the functional entity Preservation Planning from the OAIS and digital migration activities. In order to estimate these costs we have identified cost-critical activities by analysing the functions in the OAIS model and the flows between them. The analysis has been supplemented with findings from the literature, and our own knowledge and experience. The identified cost-critical activities have subsequently been deconstructed into measurable components, cost dependencies have been examined, and the resulting equations expressed in a spreadsheet. Currently the model can calculate the cost of different migration scenarios for a series of preservation formats for text, images, sound, video, geodata, and spreadsheets. In order to verify the model it has been tested on cost data from two different migration projects at the Danish National Archives (DNA. The study found that the OAIS model provides a sound overall framework for the cost breakdown, but that some functions need additional detailing in order to cost activities accurately. Running the two sets of empirical data showed among other things that the model underestimates the cost of manpower-intensive migration projects, while it reinstates an often underestimated cost, which is the cost of developing migration software. The model has proven useful for estimating the

  13. Nuclear fission: the tarnished star of our energy future

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    The use of fission nuclear energy to fuel commercial electricity-generating facilities, once considered the answer to the world's energy dilemma, is facing serious financial problems and reduced demand. Although the technology to handle the necessary functions exists, construction errors and delays, extensive cost overruns, equipment malfunctions, operator errors, continual regulation and design changes, and concern about long-term wastes and their effects on the environment and human health are plaguing the industry. Research and development efforts continue worldwide to improve the technology in the areas of use and waste handling. Many people express the belief that nuclear fission is necessary to fill the void being created by the decline in availability of fossil fuels. This may be true without extensive efforts in conservation and the use of other energy forms. 26 references, 13 figures

  14. Distribution costs -- the cost of local delivery

    International Nuclear Information System (INIS)

    Winger, N.; Zarnett, P.; Carr, J.

    2000-01-01

    Most of the power transmission system in the province of Ontario is owned and operated as a regulated monopoly by Ontario Hydro Services Company (OHSC). Local distribution systems deliver to end-users from bulk supply points within a service territory. OHSC distributes to approximately one million, mostly rural customers, while the approximately 250 municipal utilities together serve about two million, mostly urban customers. Under the Energy Competition Act of 1998 local distribution companies will face some new challenges, including unbundled billing systems, a broader range of distribution costs, increased costs, made up of corporate taxes or payments in lieu of taxes and added costs for regulatory affairs. The consultants provide a detailed discussion of the components of distribution costs, the three components of the typical budget process (capital expenditures, (CAPEX), operating and maintenance (O and M) and administration and corporate (GA and C), a summary of some typical distribution costs in Ontario, and the estimated impacts of the Energy Competition Act (ECA) compliance on charges and rates. Various mitigation strategies are also reviewed. Among these are joint ventures by local distribution companies to reduce ECA compliance costs, re-examination of controllable costs, temporary reduction of the allowable return on equity (ROE) by 50 per cent, and/or reducing the competitive transition charge (CTC). It is estimated that either one of these two reductions could eliminate the full amount of the five to seven per cent uplift in delivered energy service costs. The conclusion of the consultants is that local distribution delivery charges will make up a greater proportion of end-user cost in the future than it has in the past. An increase to customers of about five per cent is expected when the competitive electricity market opens and unbundled billing begins. The cost increase could be mitigated by a combination of actions that would be needed for about

  15. Computerized cost estimation spreadsheet and cost data base for fusion devices

    International Nuclear Information System (INIS)

    Hamilton, W.R.; Rothe, K.E.

    1985-01-01

    An automated approach to performing and cataloging cost estimates has been developed at the Fusion Engineering Design Center (FEDC), wherein the cost estimate record is stored in the LOTUS 1-2-3 spreadsheet on an IBM personal computer. The cost estimation spreadsheet is based on the cost coefficient/cost algorithm approach and incorporates a detailed generic code of cost accounts for both tokamak and tandem mirror devices. Component design parameters (weight, surface area, etc.) and cost factors are input, and direct and indirect costs are calculated. The cost data base file derived from actual cost experience within the fusion community and refined to be compatible with the spreadsheet costing approach is a catalog of cost coefficients, algorithms, and component costs arranged into data modules corresponding to specific components and/or subsystems. Each data module contains engineering, equipment, and installation labor cost data for different configurations and types of the specific component or subsystem. This paper describes the assumptions, definitions, methodology, and architecture incorporated in the development of the cost estimation spreadsheet and cost data base, along with the type of input required and the output format

  16. (Value Stream Costing As A New Costing System)

    OpenAIRE

    Karcıoğlu, Reşar; Nuray, Meral

    2010-01-01

    In recent years, the number of lean company which use lean manufacturing system is rising. This companies use the standard costing while appropriate for traditional bathch manufacturing. But standard costing system fails to support the goals of lean manufacturing system. A different method of costing based upon the characteristics of the value stream is needed to fulfill the needs of the lean company. This systemis Value Stream Costing. When a lean company moves to value stream management, th...

  17. Brain network analysis: separating cost from topology using cost-integration.

    Directory of Open Access Journals (Sweden)

    Cedric E Ginestet

    Full Text Available A statistically principled way of conducting brain network analysis is still lacking. Comparison of different populations of brain networks is hard because topology is inherently dependent on wiring cost, where cost is defined as the number of edges in an unweighted graph. In this paper, we evaluate the benefits and limitations associated with using cost-integrated topological metrics. Our focus is on comparing populations of weighted undirected graphs that differ in mean association weight, using global efficiency. Our key result shows that integrating over cost is equivalent to controlling for any monotonic transformation of the weight set of a weighted graph. That is, when integrating over cost, we eliminate the differences in topology that may be due to a monotonic transformation of the weight set. Our result holds for any unweighted topological measure, and for any choice of distribution over cost levels. Cost-integration is therefore helpful in disentangling differences in cost from differences in topology. By contrast, we show that the use of the weighted version of a topological metric is generally not a valid approach to this problem. Indeed, we prove that, under weak conditions, the use of the weighted version of global efficiency is equivalent to simply comparing weighted costs. Thus, we recommend the reporting of (i differences in weighted costs and (ii differences in cost-integrated topological measures with respect to different distributions over the cost domain. We demonstrate the application of these techniques in a re-analysis of an fMRI working memory task. We also provide a Monte Carlo method for approximating cost-integrated topological measures. Finally, we discuss the limitations of integrating topology over cost, which may pose problems when some weights are zero, when multiplicities exist in the ranks of the weights, and when one expects subtle cost-dependent topological differences, which could be masked by cost-integration.

  18. Brain Network Analysis: Separating Cost from Topology Using Cost-Integration

    Science.gov (United States)

    Ginestet, Cedric E.; Nichols, Thomas E.; Bullmore, Ed T.; Simmons, Andrew

    2011-01-01

    A statistically principled way of conducting brain network analysis is still lacking. Comparison of different populations of brain networks is hard because topology is inherently dependent on wiring cost, where cost is defined as the number of edges in an unweighted graph. In this paper, we evaluate the benefits and limitations associated with using cost-integrated topological metrics. Our focus is on comparing populations of weighted undirected graphs that differ in mean association weight, using global efficiency. Our key result shows that integrating over cost is equivalent to controlling for any monotonic transformation of the weight set of a weighted graph. That is, when integrating over cost, we eliminate the differences in topology that may be due to a monotonic transformation of the weight set. Our result holds for any unweighted topological measure, and for any choice of distribution over cost levels. Cost-integration is therefore helpful in disentangling differences in cost from differences in topology. By contrast, we show that the use of the weighted version of a topological metric is generally not a valid approach to this problem. Indeed, we prove that, under weak conditions, the use of the weighted version of global efficiency is equivalent to simply comparing weighted costs. Thus, we recommend the reporting of (i) differences in weighted costs and (ii) differences in cost-integrated topological measures with respect to different distributions over the cost domain. We demonstrate the application of these techniques in a re-analysis of an fMRI working memory task. We also provide a Monte Carlo method for approximating cost-integrated topological measures. Finally, we discuss the limitations of integrating topology over cost, which may pose problems when some weights are zero, when multiplicities exist in the ranks of the weights, and when one expects subtle cost-dependent topological differences, which could be masked by cost-integration. PMID:21829437

  19. Process-based costing.

    Science.gov (United States)

    Lee, Robert H; Bott, Marjorie J; Forbes, Sarah; Redford, Linda; Swagerty, Daniel L; Taunton, Roma Lee

    2003-01-01

    Understanding how quality improvement affects costs is important. Unfortunately, low-cost, reliable ways of measuring direct costs are scarce. This article builds on the principles of process improvement to develop a costing strategy that meets both criteria. Process-based costing has 4 steps: developing a flowchart, estimating resource use, valuing resources, and calculating direct costs. To illustrate the technique, this article uses it to cost the care planning process in 3 long-term care facilities. We conclude that process-based costing is easy to implement; generates reliable, valid data; and allows nursing managers to assess the costs of new or modified processes.

  20. Evaluation of activity-based costing versus resource-based relative value costing.

    Science.gov (United States)

    Berlin, Mark F; Smith, Tommy H

    2004-01-01

    Activity-based costing (ABC) and relative value units costing (RVU) are two approaches that a practice manager can use to determine the cost of physician services. Each costing approach has features that provide distinction as well as differentiation in the cost estimates that are estimated. This paper will provide cost estimates under each approach along with cost estimates under a hybrid approach that merges features from each costing approach known as the ABC-RVU costing technique. A comparison of the results will be provided.

  1. Cost estimation tools in Germany and the UK. Comparison of cost estimates and actual costs

    International Nuclear Information System (INIS)

    Pfeifer, W.; Gordelier, S.; Drake, V.

    2005-01-01

    Full text: Accurate cost estimation for future decommissioning projects is a matter of considerable importance, especially for ensuring that sufficient funds will be available at the time of project implementation. This paper looks at the experience of cost estimation and real implementation outcomes from two countries, Germany and the UK, and draws lessons for the future. In Germany, cost estimates for the decommissioning of power reactors are updated every two years. For this purpose, the STILLKO program of the NIS Company is used. So far, Forschungszentrum Karlsruhe has successfully decommissioned two prototype reactor facilities. Re-cultivation of the premises has already been completed. At the moment, the activated components of the multi-purpose research reactor (MZFR), the first pressurized water reactor in Germany that was moderated and cooled with heavy water, and of the prototype fast breeder reactor (KNK) are being dismantled remotely. Consequently, vast experience exists in particular for the updating of total costs on the basis of actually incurred expenses. The further the dismantling work proceeds, the more reliable is the total cost estimate. Here, the development of the estimated MZFR decommissioning costs shall be presented and compared with the estimates obtained for a German reference PWR-type power reactor of 1200 MW. In this way: - common features of the prototype reactor and power reactor shall be emphasized, - several parameters leading to an increase in the estimated costs shall be highlighted, - cost risks shall be outlined with the remote dismantling of the reactor pressure vessel serving as an example, - calculation parameters shall be presented, and - recommendations shall be made for a consistent estimation of costs. The United Kingdom Atomic Energy Authority (UKAEA) has a major programme for the environmental remediation of its former research and development sites at Dounreay, Windscale, Harwell and Winfrith together with the need to

  2. Process-Costing, Job-Order-Costing, Operation Costing (også kaldet Batch Costing og Functional Costing - Når Systemtankegangen ligger til grund for økonomistyringen og dens beslutninger)

    DEFF Research Database (Denmark)

    Nielsen, Steen

    2005-01-01

    De tre begreber process-costing, job-order-costing, operation-costing samt functional-based costing er faktisk historiske begreber som stammer langt tilbage i økonomistyringslitteraturen, faktisk tilbage til Scientific Management bevægelsen fra 20'erne og 30'erne. Man kan derfor ikke sige, at disse...... ordreregnskabet, f.eks. som dette er analyseret hos Palle Hansen og Vagn Madsen. Begrebet operational costing anvendes også, men dette dækker i realiteten over, hvordan og hvilke elementer der indgår i hele virksomhedens regnskabs-information-system. Dvs. at dette mere er et spørgsmål om, hvordan systemerne er...... Aktivitets-Baseret Cost Management systemerne. Det er derfor vigtigt dels at kende sin historie på området, dels at gøre sig klart, om de under visse antagelser stadig har deres berettigelse. De samme begreber har også deres pendant til de danske begreber, afdelings- eller funktionsregnskabet samt...

  3. Hospital financing: calculating inpatient capital costs in Germany with a comparative view on operating costs and the English costing scheme.

    Science.gov (United States)

    Vogl, Matthias

    2014-04-01

    The paper analyzes the German inpatient capital costing scheme by assessing its cost module calculation. The costing scheme represents the first separated national calculation of performance-oriented capital cost lump sums per DRG. The three steps in the costing scheme are reviewed and assessed: (1) accrual of capital costs; (2) cost-center and cost category accounting; (3) data processing for capital cost modules. The assessment of each step is based on its level of transparency and efficiency. A comparative view on operating costing and the English costing scheme is given. Advantages of the scheme are low participation hurdles, low calculation effort for G-DRG calculation participants, highly differentiated cost-center/cost category separation, and advanced patient-based resource allocation. The exclusion of relevant capital costs, nontransparent resource allocation, and unclear capital cost modules, limit the managerial relevance and transparency of the capital costing scheme. The scheme generates the technical premises for a change from dual financing by insurances (operating costs) and state (capital costs) to a single financing source. The new capital costing scheme will intensify the discussion on how to solve the current investment backlog in Germany and can assist regulators in other countries with the introduction of accurate capital costing. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  4. Road crash costs.

    NARCIS (Netherlands)

    2010-01-01

    Road crashes result in all kinds of social costs, such as medical costs, production loss, human losses, property damage, settlement costs and costs due to congestion. Studies into road crash costs and their trends are carried out quite regularly. In 2009, the costs amounted to € 12.5 billion, or

  5. Costs and Cost-Effectiveness of Plasmodium vivax Control.

    Science.gov (United States)

    White, Michael T; Yeung, Shunmay; Patouillard, Edith; Cibulskis, Richard

    2016-12-28

    The continued success of efforts to reduce the global malaria burden will require sustained funding for interventions specifically targeting Plasmodium vivax The optimal use of limited financial resources necessitates cost and cost-effectiveness analyses of strategies for diagnosing and treating P. vivax and vector control tools. Herein, we review the existing published evidence on the costs and cost-effectiveness of interventions for controlling P. vivax, identifying nine studies focused on diagnosis and treatment and seven studies focused on vector control. Although many of the results from the much more extensive P. falciparum literature can be applied to P. vivax, it is not always possible to extrapolate results from P. falciparum-specific cost-effectiveness analyses. Notably, there is a need for additional studies to evaluate the potential cost-effectiveness of radical cure with primaquine for the prevention of P. vivax relapses with glucose-6-phosphate dehydrogenase testing. © The American Society of Tropical Medicine and Hygiene.

  6. Computerized cost estimation spreadsheet and cost data base for fusion devices

    International Nuclear Information System (INIS)

    Hamilton, W.R.; Rothe, K.E.

    1985-01-01

    Component design parameters (weight, surface area, etc.) and cost factors are input and direct and indirect costs are calculated. The cost data base file derived from actual cost experience within the fusion community and refined to be compatible with the spreadsheet costing approach is a catalog of cost coefficients, algorithms, and component costs arranged into data modules corresponding to specific components and/or subsystems. Each data module contains engineering, equipment, and installation labor cost data for different configurations and types of the specific component or subsystem. This paper describes the assumptions, definitions, methodology, and architecture incorporated in the development of the cost estimation spreadsheet and cost data base, along with the type of input required and the output format

  7. Maintenance cost models in deregulated power systems under opportunity costs

    International Nuclear Information System (INIS)

    Al-Arfaj, K.; Dahal, K.; Azaiez, M.N.

    2007-01-01

    In a centralized power system, the operator is responsible for scheduling maintenance. There are different types of maintenance, including corrective maintenance; predictive maintenance; preventive maintenance; and reliability-centred maintenance. The main cause of power failures is poor maintenance. As such, maintenance costs play a significant role in deregulated power systems. They include direct costs associated with material and labor costs as well as indirect costs associated with spare parts inventory, shipment, test equipment, indirect labor, opportunity costs and cost of failure. In maintenance scheduling and planning, the cost function is the only component of the objective function. This paper presented the results of a study in which different components of maintenance costs were modeled. The maintenance models were formulated as an optimization problem with single and multiple objectives and a set of constraints. The maintenance costs models could be used to schedule the maintenance activities of power generators more accurately and to identify the best maintenance strategies over a period of time as they consider failure and opportunity costs in a deregulated environment. 32 refs., 4 tabs., 4 figs

  8. Cost Model for Digital Curation: Cost of Digital Migration

    DEFF Research Database (Denmark)

    Kejser, Ulla Bøgvad; Nielsen, Anders Bo; Thirifays, Alex

    2009-01-01

    The Danish Ministry of Culture is currently funding a project to set up a model for costing preservation of digital materials held by national cultural heritage institutions. The overall objective of the project is to provide a basis for comparing and estimating future financial requirements...... for digital preservation and to increase cost effectiveness of digital preservation activities. In this study we describe an activity based costing methodology for digital preservation based on the OAIS Reference Model. In order to estimate the cost of digital migrations we have identified cost critical...

  9. Materials management system in interventional radiology - initial experience with a computer-supported program; Materialverwaltung in der interventionellen Radiologie - erste Erfahrungen mit einem computergestuetzten Programm

    Energy Technology Data Exchange (ETDEWEB)

    Clevert, D.-A.; Reiser, M. [Universitaetsklinikum Muenchen (Germany). Institut fuer klinische Radiologie; Jung, E.M.; Rupp, N. [Institut fuer diagnostische Radiologie, Passau (Germany)

    2004-10-01

    Purpose: To perform a cost analysis for assessing options of reorganizing material supplies and reducing costs of the radiology division through the introduction of a materials management system. Materials and Methods: A materials management system (Piranha, Boston Scientific) was installed on an existing computer system. All consumables were inventoried and entered into the system. An ABC analysis determined further action. On the basis of order frequencies and availability requirements for emergencies, safety levels were agreed with physicians and other medical staff. Inventory costs were computed using these data. The interest rate for the capital tied up in the inventory was 8% per year. Results: The inventory showed that the capital tied up in stocks was Euro 260,000 and 2001 and Euro 190,000 in 2002. A change in supply strategy reduced inventory cost in 2001 and 2002. Annual interest expense was lowered by Euro 18,420. Another saving of Euro 2,700 was achieved by a reduction in storage cost. Annual inventory turnover totaled Euro 298,000. The total cost cut through improved inventory management was Euro 21,120 per year, which is equivalent to 7% of the annual expenses. Adding the decline in the cost of shelf time overruns equal to 5% of the annual expenses, the saving was approximately 12% of total interventional radiology cost in 2001 and some 11% in 2002. Conclusion: Flexible supply strategies and the introduction of a materials management program can help to reduce inventory costs in interventional radiology divisions without any impact on service levels. (orig.)

  10. 76 FR 81295 - Cost Accounting Standards: Cost Accounting Standards 412 and 413-Cost Accounting Standards...

    Science.gov (United States)

    2011-12-27

    ... accounting standards governing measurement, assignment, and allocation of costs to contracts with the United... contracting parties; Measurement of pension costs must be objectively verifiable; Accounting rules must keep... cost accounting that preclude their use for the appropriate measurement, assignment and allocation of...

  11. A framework for cost-aware process management: cost reporting and cost prediction

    NARCIS (Netherlands)

    Wynn, M.T.; Low, W.Z.; Hofstede, ter A.H.M.; Nauta, W.E.

    2014-01-01

    Organisations are constantly seeking efficiency gains for their business processes in terms of time and cost. Management accounting enables detailed cost reporting of business operations for decision making purposes, although significant effort is required to gather accurate operational data.

  12. Effects of ratio of milk fat to soy bean oil and whipping time on qualities of milk ice cream

    Directory of Open Access Journals (Sweden)

    Sukrit Thaiudom

    2007-01-01

    Full Text Available Qualities of ice cream are based on air cells, ice crystals and fat particles, which are the important parts to build up a good structure of ice cream. Ice cream whipping time also affects the ice cream qualities.This study focused on effects of ratio of milk fat to soy bean oil, whipping time, and their interaction on ice cream mix viscosity, overrun, air cell size, fat destabilization, hardness, melting rate, and shape retention ofice cream. Ice creams with ratio of milk fat to soy bean oil at 100:0, 50:50, 0:100 and whipping time at 15 and 20 min were produced and determined for their qualities. The results showed that ratio of milk fat to soybean oil affected all qualities of ice cream, while duration of whipping time influenced the overrun and air cell size. The interaction of ratio of milk fat to soy bean oil and whipping time affected only overrun. Ice creammix with ratio of milk fat to soy bean oil 100:0 showed the highest apparent viscosity and hardness and the biggest air cell size. Whipping time of ice cream for 20 min showed a bigger size of air cells than the whippingtime for 15 min (p < 0.05. These results can be applied to the manufacture of modified ice cream.

  13. Short communication: Effect of whey protein addition and transglutaminase treatment on the physical and sensory properties of reduced-fat ice cream.

    Science.gov (United States)

    Danesh, Erfan; Goudarzi, Mostafa; Jooyandeh, Hossein

    2017-07-01

    The effects of whey protein addition and transglutaminase treatment, alone and in combination, on the physical and sensory properties of reduced-fat ice cream were investigated. Adding whey protein with or without enzyme treatment decreased melting rate, overrun, and hardness of the reduced-fat ice cream; however, the enzyme-treated sample had a higher melting rate and overrun and softer texture. Whey protein-fortified samples showed higher melting resistance, but lower overrun and firmer texture compared with the enzyme-treated sample without added whey protein. Whey protein addition with or without transglutaminase treatment caused an increase in apparent viscosity and a decrease in flow index of the reduced-fat ice cream; nevertheless, the flow behavior of full-fat sample was most similar to the enzyme-treated reduced-fat sample with no added whey protein. Descriptive sensory analyses showed that neither whey protein addition nor transglutaminase treatment significantly influenced the flavor and odor of reduced-fat ice cream, but they both noticeably improved the color and texture of the final product. The results of this study suggest that whey protein addition with transglutaminase treatment improves the physical and sensory properties of reduced-fat ice cream more favorably than does whey protein addition or transglutaminase treatment alone. Copyright © 2017 American Dairy Science Association. Published by Elsevier Inc. All rights reserved.

  14. Cost benefit analysis cost effectiveness analysis

    International Nuclear Information System (INIS)

    Lombard, J.

    1986-09-01

    The comparison of various protection options in order to determine which is the best compromise between cost of protection and residual risk is the purpose of the ALARA procedure. The use of decision-aiding techniques is valuable as an aid to selection procedures. The purpose of this study is to introduce two rather simple and well known decision aiding techniques: the cost-effectiveness analysis and the cost-benefit analysis. These two techniques are relevant for the great part of ALARA decisions which need the use of a quantitative technique. The study is based on an hypothetical case of 10 protection options. Four methods are applied to the data

  15. Optimizing cost-efficiency in mean exposure assessment--cost functions reconsidered.

    Science.gov (United States)

    Mathiassen, Svend Erik; Bolin, Kristian

    2011-05-21

    Reliable exposure data is a vital concern in medical epidemiology and intervention studies. The present study addresses the needs of the medical researcher to spend monetary resources devoted to exposure assessment with an optimal cost-efficiency, i.e. obtain the best possible statistical performance at a specified budget. A few previous studies have suggested mathematical optimization procedures based on very simple cost models; this study extends the methodology to cover even non-linear cost scenarios. Statistical performance, i.e. efficiency, was assessed in terms of the precision of an exposure mean value, as determined in a hierarchical, nested measurement model with three stages. Total costs were assessed using a corresponding three-stage cost model, allowing costs at each stage to vary non-linearly with the number of measurements according to a power function. Using these models, procedures for identifying the optimally cost-efficient allocation of measurements under a constrained budget were developed, and applied on 225 scenarios combining different sizes of unit costs, cost function exponents, and exposure variance components. Explicit mathematical rules for identifying optimal allocation could be developed when cost functions were linear, while non-linear cost functions implied that parts of or the entire optimization procedure had to be carried out using numerical methods.For many of the 225 scenarios, the optimal strategy consisted in measuring on only one occasion from each of as many subjects as allowed by the budget. Significant deviations from this principle occurred if costs for recruiting subjects were large compared to costs for setting up measurement occasions, and, at the same time, the between-subjects to within-subject variance ratio was small. In these cases, non-linearities had a profound influence on the optimal allocation and on the eventual size of the exposure data set. The analysis procedures developed in the present study can be used

  16. Allocation base of general production costs as optimization of prime costs

    Directory of Open Access Journals (Sweden)

    Levytska I.O.

    2017-03-01

    Full Text Available Qualified management aimed at optimizing financial results is the key factor in today's society. Effective management decisions depend on the necessary information about the costs of production process in all its aspects – their structure, types, accounting policies of reflecting costs. General production costs, the so-called indirect costs that are not directly related to the production process, but provide its functioning in terms of supporting structural divisions and create the necessary conditions of production, play a significant role in calculating prime costs of goods (works, services. However, the accurate estimate of prime costs of goods (works, services should be determined with the value of indirect costs (in other words, general production costs, and properly determined with the base of their allocation. The choice of allocation base of general production costs is the significant moment, depending on the nature of business, which must guarantee fair distribution regarding to the largest share of direct expenses in the total structure of production costs. The study finds the essence of general production costs based on the analysis of key definitions of leading Ukrainian economists. The optimal allocation approach of general production costs is to calculate these costs as direct production costs within each subsidiary division (department separately without selecting a base as the main one to the their total amount.

  17. 76 FR 53378 - Cost Accounting Standards: Accounting for Insurance Costs

    Science.gov (United States)

    2011-08-26

    ... Accounting Standards: Accounting for Insurance Costs AGENCY: Cost Accounting Standards Board (Board), Office... Discontinuation of Rulemaking. SUMMARY: The Office of Federal Procurement Policy (OFPP), Cost Accounting Standards... development of an amendment to Cost Accounting Standard (CAS) 416 regarding the use of the term ``catastrophic...

  18. Cardiac rehabilitation costs.

    Science.gov (United States)

    Moghei, Mahshid; Turk-Adawi, Karam; Isaranuwatchai, Wanrudee; Sarrafzadegan, Nizal; Oh, Paul; Chessex, Caroline; Grace, Sherry L

    2017-10-01

    Despite the clinical benefits of cardiac rehabilitation (CR) and its cost-effectiveness, it is not widely received. Arguably, capacity could be greatly increased if lower-cost models were implemented. The aims of this review were to describe: the costs associated with CR delivery, approaches to reduce these costs, and associated implications. Upon finalizing the PICO statement, information scientists were enlisted to develop the search strategy of MEDLINE, Embase, CDSR, Google Scholar and Scopus. Citations identified were considered for inclusion by the first author. Extracted cost data were summarized in tabular format and qualitatively synthesized. There is wide variability in the cost of CR delivery around the world, and patients pay out-of-pocket for some or all of services in 55% of countries. Supervised CR costs in high-income countries ranged from PPP$294 (Purchasing Power Parity; 2016 United States Dollars) in the United Kingdom to PPP$12,409 in Italy, and in middle-income countries ranged from PPP$146 in Venezuela to PPP$1095 in Brazil. Costs relate to facilities, personnel, and session dose. Delivering CR using information and communication technology (mean cost PPP$753/patient/program), lowering the dose and using lower-cost personnel and equipment are important strategies to consider in containing costs, however few explicitly low-cost models are available in the literature. More research is needed regarding the costs to deliver CR in community settings, the cost-effectiveness of CR in most countries, and the economic impact of return-to-work with CR participation. A low-cost model of CR should be standardized and tested for efficacy across multiple healthcare systems. Copyright © 2017 Elsevier B.V. All rights reserved.

  19. [Productivity costs of rheumatoid arthritis in Germany. Cost composition and prediction of main cost components].

    Science.gov (United States)

    Merkesdal, S; Huelsemann, J L; Mittendorf, T; Zeh, S; Zeidler, H; Ruof, J

    2006-10-01

    Identification of predictors for the productivity cost components: (1) sick leave, and (2) work disability in gainfully employed and (3) impaired household productivity in unemployed patients with rheumatoid arthritis (RA) from the societal perspective. Investigation of productivity costs was linked to a multicenter, randomized, controlled trial evaluating the effectiveness of clinical quality management in 338 patients with RA. The productivity losses were assessed according to the German Guidelines on Health Economic Evaluation. By means of multivariate logistic regression analyses, predictors of sick leave, work disability (employed patients, n=96), and for days confined to bed in unemployed patient (n=242) were determined. Mean annual costs of 970 EUR arose per person taking into consideration all patients (453 EUR sick leave, 63 EUR work disability, 454 EUR impaired productivity of unemployed patients). Disease activity, disease severity, and impaired physical function were global predictors for all of the cost components investigated. Sick leave costs were predicted by prior sick leave periods and the vocational status blue collar worker, work disability costs by sociodemographic variables (marital status, schooling), and the productivity costs of unemployed patients by impaired mental health and impaired physical functions. Interventions such as reduction in disease progression and control of disease activity, early vocational rehabilitation measures and vocational retraining in patients at risk of quitting working life, and self-management programs to learn coping strategies might decrease future RA-related productivity costs.

  20. Investigation of a Water-Pond Arresting of a Dynamic Model of a Jet Transport

    Science.gov (United States)

    Thompson, William C.

    1961-01-01

    Brief dynamic-model tests have been made at the request of the Federal Aviation Agency to investigate the use of a shallow pond of water at the end of a runway as a means of arresting jet-transport aircraft when they are forced to abort on take-off or overrun on landing. Such a scheme is of particular interest for civil aircraft because it requires no modifications or attachments to the airplane and no mechanical devices in the arresting system. A modification of this scheme that uses a flexible plastic cover over the water surface has also been tested. The purpose of this paper is to present the results of a dynamic model investigation which would aid in determining whether the water-pond arresting system could be used as a means of arresting airplane overrun.

  1. A Comparative Analysis of Activity-Based Costing and Traditional Costing

    OpenAIRE

    Derya Eren Akyol; Gonca Tuncel; G. Mirac Bayhan

    2007-01-01

    Activity-Based Costing (ABC) which has become an important aspect of manufacturing/service organizations can be defined as a methodology that measures the cost and performance of activities, resources and cost objects. It can be considered as an alternative paradigm to traditional cost-based accounting systems. The objective of this paper is to illustrate an application of ABC method and to compare the results of ABC with traditional costing methods. The results of the application highlight t...

  2. Modelling User-Costs in Life Cycle Cost-Benefit (LCCB) analysis

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    2008-01-01

    The importance of including user's costs in Life-Cycle Cost-Benefit analysis of structures is discussed in this paper. This is especially for bridges of great importance. Repair or/and failure of a bridge will usually result in user costs greater than the repair or replacement costs of the bridge...

  3. Economic costs of drug abuse: financial, cost of illness, and services.

    Science.gov (United States)

    Cartwright, William S

    2008-03-01

    This article examines costs as they relate to the financial costs of providing drug abuse treatment in private and public health plans, costs to society relating to drug abuse, and many smaller costing studies of various stakeholders in the health care system. A bibliography is developed from searches across PubMed, Web of Science, and other bibliographic sources. The review indicates that a wide collection of cost findings is available to policy makers. For example, the financial aspects of health plans have been dominated by considerations of actuarial costs of parity for drug abuse treatment. Cost-of-illness methods have been developed and extended to drug abuse costing to measure the national level of burden and are important to the economic evaluation of interventions at the program level. Costing is done in many small and focused studies, reflecting the interests of different stakeholders in the health care system. For costs in programs and health plans, as well as cost offsets of the impact of substance abuse treatment on medical expenditures, findings are surprisingly important to policy makers. Maintaining ongoing research that is highly policy relevant from the point of view of health services, more is needed on costing concepts and measurement applications.

  4. Consumer-Operated Service Programs: monetary and donated costs and cost-effectiveness.

    Science.gov (United States)

    Yates, Brian T; Mannix, Danyelle; Freed, Michael C; Campbell, Jean; Johnsen, Matthew; Jones, Kristine; Blyler, Crystal R

    2011-01-01

    Examine cost differences between Consumer Operated Service Programs (COSPs) as possibly determined by a) size of program, b) use of volunteers and other donated resources, c) cost-of-living differences between program locales, d) COSP model applied, and e) delivery system used to implement the COSP model. As part of a larger evaluation of COSP, data on operating costs, enrollments, and mobilization of donated resources were collected for eight programs representing three COSP models (drop-in centers, mutual support, and education/advocacy training). Because the 8 programs were operated in geographically diverse areas of the US, costs were examined with and without adjustment for differences in local cost of living. Because some COSPs use volunteers and other donated resources, costs were measured with and without these resources being monetized. Scale of operation also was considered as a mediating variable for differences in program costs. Cost per visit, cost per consumer per quarter, and total program cost were calculated separately for funds spent and for resources donated for each COSP. Differences between COSPs in cost per consumer and cost per visit seem better explained by economies of scale and delivery system used than by cost-of-living differences between program locations or COSP model. Given others' findings that different COSP models produce little variation in service effectiveness, minimize service costs by maximizing scale of operation while using a delivery system that allows staff and facilities resources to be increased or decreased quickly to match number of consumers seeking services.

  5. Cost Optimization of Product Families using Analytic Cost Models

    DEFF Research Database (Denmark)

    Brunø, Thomas Ditlev; Nielsen, Peter

    2012-01-01

    This paper presents a new method for analysing the cost structure of a mass customized product family. The method uses linear regression and backwards selection to reduce the complexity of a data set describing a number of historical product configurations and incurred costs. By reducing the data...... set, the configuration variables which best describe the variation in product costs are identified. The method is tested using data from a Danish manufacturing company and the results indicate that the method is able to identify the most critical configuration variables. The method can be applied...... in product family redesign projects focusing on cost reduction to identify which modules contribute the most to cost variation and should thus be optimized....

  6. Nuclear fuel cycle cost and cost calculation

    International Nuclear Information System (INIS)

    Schmiedel, P.; Schricker, W.

    1975-01-01

    Four different methods of calculating the cost of the fuel cycle are explained, starting from the individual cost components with their specific input data. The results (for LWRs) are presented in tabular form and in the form of diagrams. (RB) [de

  7. Cost system design and cost management in the Spanish public sector

    OpenAIRE

    Boned, Josep Lluís; Bagur, Llorenç; Tayles, Mike

    2006-01-01

    Cost systems have been shown to have developed considerably in recent years and activity-based costing (ABC) has been shown to be a contribution to cost management, particularly in service businesses. The public sector is composed to a very great extent of service functions, yet considerably less has been reported of the use of ABC to support cost management in this sector. In Spain, cost systems are essential for city councils as they are obliged to calculate the cost of the services subject...

  8. Cost comparisons

    CERN Multimedia

    CERN Bulletin

    2010-01-01

    How much does the LHC cost? And how much does this represent in other currencies? Below we present a table showing some comparisons with the cost of other projects. Looking at the figures, you will see that the cost of the LHC can be likened to that of three skyscrapers, or two seasons of Formula 1 racing! One year's budget of a single large F1 team is comparable to the entire materials cost of the ATLAS or CMS experiments.   Please note that all the figures are rounded for ease of reading.    CHF € $   LHC 4.6 billions 3 billions  4 billions   Space Shuttle Endeavour (NASA) 1.9 billion 1.3 billion 1.7 billion   Hubble Space Telescope (cost at launch – NASA/...

  9. [Relating costs to activities in hospitals. Use of internal cost accounting].

    Science.gov (United States)

    Stavem, K

    1995-01-10

    During the last few years hospital cost accounting has become widespread in many countries, in parallel with increasing cost pressure, greater competition and new financing schemes. Cost accounting has been used in the manufacturing industry for many years. Costs can be related to activities and production, e.g. by the costing of procedures, episodes of care and other internally defined cost objectives. Norwegian hospitals have lagged behind in the adoption of cost accounting. They ought to act quickly if they want to be prepared for possible changes in health care financing. The benefits can be considerable to a hospital operating in a rapidly changing health care environment.

  10. Cost of illness and determinants of costs among patients with gout.

    Science.gov (United States)

    Spaetgens, Bart; Wijnands, José M A; van Durme, Caroline; van der Linden, Sjef; Boonen, Annelies

    2015-02-01

    To estimate costs of illness in a cross-sectional cohort of patients with gout attending an outpatient rheumatology clinic, and to evaluate which factors contribute to higher costs. Altogether, 126 patients with gout were clinically assessed. They completed a series of questionnaires. Health resource use was collected using a self-report questionnaire that was cross-checked with the electronic patient file. Productivity loss was assessed by the Work Productivity and Activity Impairment Questionnaire, addressing absenteeism and presenteeism. Resource use and productivity loss were valued by real costs, and annual costs per patient were calculated. Factors contributing to incurring costs above the median were explored using logistic univariable and multivariable regression analysis. Mean (median) annual direct costs of gout were €5647 (€1148) per patient. Total costs increased to €6914 (€1279) or €10,894 (€1840) per patient per year when adding cost for absenteeism or both absenteeism and presenteeism, respectively. Factors independently associated with high direct and high indirect costs were a positive history of cardiovascular disease, functional limitations, and female sex. In addition, pain, gout concerns, and unmet gout treatment needs were associated with high direct costs. The direct and indirect costs-of-illness of gout are primarily associated with cardiovascular disease, functional limitations, and female sex.

  11. An improved set of standards for finding cost for cost-effectiveness analysis.

    Science.gov (United States)

    Barnett, Paul G

    2009-07-01

    Guidelines have helped standardize methods of cost-effectiveness analysis, allowing different interventions to be compared and enhancing the generalizability of study findings. There is agreement that all relevant services be valued from the societal perspective using a long-term time horizon and that more exact methods be used to cost services most affected by the study intervention. Guidelines are not specific enough with respect to costing methods, however. The literature was reviewed to identify the problems associated with the 4 principal methods of cost determination. Microcosting requires direct measurement and is ordinarily reserved to cost novel interventions. Analysts should include nonwage labor cost, person-level and institutional overhead, and the cost of development, set-up activities, supplies, space, and screening. Activity-based cost systems have promise of finding accurate costs of all services provided, but are not widely adopted. Quality must be evaluated and the generalizability of cost estimates to other settings must be considered. Administrative cost estimates, chiefly cost-adjusted charges, are widely used, but the analyst must consider items excluded from the available system. Gross costing methods determine quantity of services used and employ a unit cost. If the intervention will affect the characteristics of a service, the method should not assume that the service is homogeneous. Questions are posed for future reviews of the quality of costing methods. The analyst must avoid inappropriate assumptions, especially those that bias the analysis by exclusion of costs that are affected by the intervention under study.

  12. The Danish Rejsekortet (Smart Card for Public Transportation); Project Governance for Failure or Success?

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    The authors examine a project regarded as a major failure in Danish public investments: The Smart Card for Public Transportation whose introduction was delayed for 9 years with an estimated cost overrun of 125 million EURO. After 3 years of operation, the Smart Card system only covers seven...... of the nine Danish regions and the discussion about giving up the system is continuing. The authors explore the overall conditions set up for these types of projects in the project governance - how project governance conditions a major public IT project and forms the success evaluation. The focus...... is on the whole cycle from project initiation to long-term use of the project results. Data collection is through documentation as governmental reports and evaluations, for example (Rigsrevisionen, 2011; The Comptroller and Auditor General, 2006; Transport Committee, 2011)and semi-structured interviews...

  13. The Danish Rejsekortet ( Smart Card for Public Transportation ): Project Governance for Failure or Success ?

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    The authors examine a project regarded as a major failure in Danish public investments: The Smart Card for Public Transportation whose introduction was delayed for 9 years with an estimated cost overrun of 125 million EURO. After 3 years of operation, the Smart Card system only covers seven...... of the nine Danish regions and the discussion about giving up the system is continuing. The authors explore the overall conditions set up for these types of projects in the project governance - how project governance conditions a major public IT project and forms the success evaluation. The focus...... is on the whole cycle from project initiation to long-term use of the project results. Data collection is through documentation as governmental reports and evaluations, for example (Rigsrevisionen, 2011; The Comptroller and Auditor General, 2006; Transport Committee, 2011)and semi-structured interviews...

  14. Avoided investment in WPPSS 4 and 5: the case of Seattle City Light

    International Nuclear Information System (INIS)

    Harlow, C.S.

    1984-01-01

    In early 1976, Seattle City Light, a municipal electric utility owned by the citizens of Seattle, Washington, elected not to exercise its option to purchase 10% of two power plants to be constructed by the Washington Public Power Supply System (WPPSS). As is generally now known, construction of these two plants, WPPSS 4 and 5, was halted by the early 1980's after large cost overruns, engendering a default on $3 billion of WPPSS bonds, securities that had been regarded as gilt-edge, absolutely safe investments. In not exercising its option to participate in ownership of these two plants, Seattle was therefore spared the legal and political difficulties experienced by utilities that did participate. The process by which Seattle made its decision not to participate in construction of WPPSS 4 and 5 is the subject of this paper. 3 references

  15. Northwest power gamble: Washington utilities go for broke on nuclear; region's citizens make conservation bid

    International Nuclear Information System (INIS)

    Brummer, J.

    1981-01-01

    The Washington Public Power Supply System (WPPSS) is asking for a reactor construction moratorium in an effort to get fast relief from the Bonneville Power Administration (BPA), which is authorized to guarantee power purchases from new power plants. Supporters of nuclear power plants as well as those of the soft energy path are watching to see how BPA will handle its mandate against acquiring new thermal plants until conservation and renewable energy potentials are exhausted. BPA can subvert the Pacific Northwest Power Act with 20-year contracts based on conventional forecasts despite evidence that new plants are unneeded. There is also evidence that the public rejects the idea of a moral obligation to bail out nuclear power cost overruns at taxpayer expense. The negotiations involve not only WPPSS and BPA, but Moody's Investor Service and environmental groups

  16. Design to Process Capabilities: challenges for the use of Process Capability Databases (PCDBs) in development

    DEFF Research Database (Denmark)

    Eifler, Tobias; Göhler, Simon Moritz; Howard, Thomas J.

    2014-01-01

    capabilities may lead to low yields and a cost/time overrun, conservatively underestimated capabilities affect quality through the reduced design space, or through increased play, rattle/noise, size or weight. A possibility to overcome the subjective assessment of variation in development projects is a Process...... and Maiti (2012), Breyfogle (2003)]. At the same time, information on the achievable manufacturing accuracy or the supplier’s performance is usually inaccurate and largely qualitative in early development stages. Design decisions as well as the choice of manufacturing processes, therefore, often rely...... Capability Data Base (PCDB) offering valuable insight into the actual or expected performance of production processes (Tata and Thornton, 1999). But although the potential benefits as well as initial challenges for the use of PCDBs have been addressed in earlier research, e. g. by Delaney and Phelan (2008...

  17. Cost analysis guidelines

    International Nuclear Information System (INIS)

    Strait, R.S.

    1996-01-01

    The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy's (DOE's) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies

  18. Economic costs of obesity in Thailand: a retrospective cost-of-illness study.

    Science.gov (United States)

    Pitayatienanan, Paiboon; Butchon, Rukmanee; Yothasamut, Jomkwan; Aekplakorn, Wichai; Teerawattananon, Yot; Suksomboon, Naeti; Thavorncharoensap, Montarat

    2014-04-02

    Over the last decade, the prevalence of obesity (BMI ≥ 25 kg/m2) in Thailand has been rising rapidly and consistently. Estimating the cost of obesity to society is an essential step in setting priorities for research and resource use and helping improve public awareness of the negative economic impacts of obesity. This prevalence-based, cost-of-illness study aims to estimate the economic costs of obesity in Thailand. The estimated costs in this study included health care cost, cost of productivity loss due to premature mortality, and cost of productivity loss due to hospital-related absenteeism. The Obesity-Attributable Fraction (OAF) was used to estimate the extent to which the co-morbidities were attributable to obesity. The health care cost of obesity was further estimated by multiplying the number of patients in each disease category attributable to obesity by the unit cost of treatment. The cost of productivity loss was calculated using the human capital approach. The health care cost attributable to obesity was estimated at 5,584 million baht or 1.5% of national health expenditure. The cost of productivity loss attributable to obesity was estimated at 6,558 million baht - accounting for 54% of the total cost of obesity. The cost of hospital-related absenteeism was estimated at 694 million baht, while the cost of premature mortality was estimated at 5,864 million baht. The total cost of obesity was then estimated at 12,142 million baht (725.3 million US$PPP, 16.74 baht =1 US$PPP accounting for 0.13% of Thailand's Gross Domestic Product (GDP). Obesity imposes a substantial economic burden on Thai society especially in term of health care costs. Large-scale comprehensive interventions focused on improving public awareness of the cost of and problems associated with obesity and promoting a healthy lifestyle should be regarded as a public health priority.

  19. Activity-based costing methodology as tool for costing in hematopathology laboratory.

    Science.gov (United States)

    Gujral, Sumeet; Dongre, Kanchan; Bhindare, Sonal; Subramanian, P G; Narayan, Hkv; Mahajan, Asim; Batura, Rekha; Hingnekar, Chitra; Chabbria, Meenu; Nair, C N

    2010-01-01

    Cost analysis in laboratories represents a necessary phase in their scientific progression. To calculate indirect cost and thus total cost per sample of various tests at Hematopathology laboratory (HPL). Activity-based costing (ABC) method is used to calculate per cost test of the hematopathology laboratory. Information is collected from registers, purchase orders, annual maintenance contracts (AMCs), payrolls, account books, hospital bills and registers along with informal interviews with hospital staff. Cost per test decreases as total number of samples increases. Maximum annual expense at the HPL is on reagents and consumables followed by manpower. Cost per test is higher for specialized tests which interpret morphological or flow data and are done by a pathologist. Despite several limitations and assumptions, this was an attempt to understand how the resources are consumed in a large size government-run laboratory. The rate structure needs to be revised for most of the tests, mainly for complete blood counts (CBC), bone marrow examination, coagulation tests and Immunophenotyping. This costing exercise is laboratory specific and each laboratory needs to do its own costing. Such an exercise may help a laboratory redesign its costing structure or at least understand the economics involved in the laboratory management.

  20. [Hospital costs estimation by micro and gross-costing approaches].

    Science.gov (United States)

    Guerre, P; Hayes, N; Bertaux, A-C

    2018-03-01

    Cost analysis has become increasingly commonplace in healthcare facilities in recent years. Regardless of the aim, the first consideration for a hospital costing process is to determine the point of view, or perspective, to adopt. Should the cost figures reflect the healthcare facility's point of view or enlighten perspectives for the public health insurance system? Another consideration is in regard to the method to adopt, as there are several. The two most widely used methods to determine the costs of hospital treatments in France are the micro-costing method and the gross-costing method. The aims of this work are: (1) to describe each of these methods (e.g. data collection, assignment of monetary value to resource consumption) with their advantages and shortcomings as they relate to the difficulties encountered with their implementation in hospitals; (2) to present a review of the literature comparing the two methods and their possible combination; and (3) to propose ways to address the questions that need to be asked before compiling resource consumption data and assigning monetary value to hospital costs. A final diagram summarizes methodologies to be preferred according to the evaluation strategy and the impact on patient care. Copyright © 2018 Elsevier Masson SAS. All rights reserved.

  1. Time-driven Activity-based Costing More Accurately Reflects Costs in Arthroplasty Surgery.

    Science.gov (United States)

    Akhavan, Sina; Ward, Lorrayne; Bozic, Kevin J

    2016-01-01

    Cost estimates derived from traditional hospital cost accounting systems have inherent limitations that restrict their usefulness for measuring process and quality improvement. Newer approaches such as time-driven activity-based costing (TDABC) may offer more precise estimates of true cost, but to our knowledge, the differences between this TDABC and more traditional approaches have not been explored systematically in arthroplasty surgery. The purposes of this study were to compare the costs associated with (1) primary total hip arthroplasty (THA); (2) primary total knee arthroplasty (TKA); and (3) three surgeons performing these total joint arthroplasties (TJAs) as measured using TDABC versus traditional hospital accounting (TA). Process maps were developed for each phase of care (preoperative, intraoperative, and postoperative) for patients undergoing primary TJA performed by one of three surgeons at a tertiary care medical center. Personnel costs for each phase of care were measured using TDABC based on fully loaded labor rates, including physician compensation. Costs associated with consumables (including implants) were calculated based on direct purchase price. Total costs for 677 primary TJAs were aggregated over 17 months (January 2012 to May 2013) and organized into cost categories (room and board, implant, operating room services, drugs, supplies, other services). Costs derived using TDABC, based on actual time and intensity of resources used, were compared with costs derived using TA techniques based on activity-based costing and indirect costs calculated as a percentage of direct costs from the hospital decision support system. Substantial differences between cost estimates using TDABC and TA were found for primary THA (USD 12,982 TDABC versus USD 23,915 TA), primary TKA (USD 13,661 TDABC versus USD 24,796 TA), and individually across all three surgeons for both (THA: TDABC = 49%-55% of TA total cost; TKA: TDABC = 53%-55% of TA total cost). Cost

  2. THEORETICAL AND PRACTICAL CONSIDERATIONS REGARDING THE COST CALCULATION USING DIRECT COSTING

    Directory of Open Access Journals (Sweden)

    Cristina Aurora, Bunea-Bontaş

    2012-01-01

    Full Text Available The definition of the cost of production as applied to inventories refers to the acquisition and production cost, and its determination involves many considerations. This article emphasizes a comparative approach of the calculation of production cost under direct costing and absorption costing, and examines the impact of using these calculation systems on the financial performance of the companies presented in the income statement.

  3. OOTW COST TOOLS

    Energy Technology Data Exchange (ETDEWEB)

    HARTLEY, D.S.III; PACKARD, S.L.

    1998-09-01

    This document reports the results of a study of cost tools to support the analysis of Operations Other Than War (OOTW). It recommends the continued development of the Department of Defense (DoD) Contingency Operational Support Tool (COST) as the basic cost analysis tool for 00TWS. It also recommends modifications to be included in future versions of COST and the development of an 00TW mission planning tool to supply valid input for costing.

  4. Pine invasions in treeless environments: dispersal overruns microsite heterogeneity.

    Science.gov (United States)

    Pauchard, Aníbal; Escudero, Adrián; García, Rafael A; de la Cruz, Marcelino; Langdon, Bárbara; Cavieres, Lohengrin A; Esquivel, Jocelyn

    2016-01-01

    Understanding biological invasions patterns and mechanisms is highly needed for forecasting and managing these processes and their negative impacts. At small scales, ecological processes driving plant invasions are expected to produce a spatially explicit pattern driven by propagule pressure and local ground heterogeneity. Our aim was to determine the interplay between the intensity of seed rain, using distance to a mature plantation as a proxy, and microsite heterogeneity in the spreading of Pinus contorta in the treeless Patagonian steppe. Three one-hectare plots were located under different degrees of P. contorta invasion (Coyhaique Alto, 45° 30'S and 71° 42'W). We fitted three types of inhomogeneous Poisson models to each pine plot in an attempt for describing the observed pattern as accurately as possible: the "dispersal" models, "local ground heterogeneity" models, and "combined" models, using both types of covariates. To include the temporal axis in the invasion process, we analyzed both the pattern of young and old recruits and also of all recruits together. As hypothesized, the spatial patterns of recruited pines showed coarse scale heterogeneity. Early pine invasion spatial patterns in our Patagonian steppe site is not different from expectations of inhomogeneous Poisson processes taking into consideration a linear and negative dependency of pine recruit intensity on the distance to afforestations. Models including ground-cover predictors were able to describe the point pattern process only in a couple of cases but never better than dispersal models. This finding concurs with the idea that early invasions depend more on seed pressure than on the biotic and abiotic relationships seed and seedlings establish at the microsite scale. Our results show that without a timely and active management, P. contorta will invade the Patagonian steppe independently of the local ground-cover conditions.

  5. 48 CFR 9904.414 - Cost accounting standard-cost of money as an element of the cost of facilities capital.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard... Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING...

  6. Costs and cost-effectiveness of malaria control interventions - a systematic review

    Directory of Open Access Journals (Sweden)

    White Michael T

    2011-11-01

    Full Text Available Abstract Background The control and elimination of malaria requires expanded coverage of and access to effective malaria control interventions such as insecticide-treated nets (ITNs, indoor residual spraying (IRS, intermittent preventive treatment (IPT, diagnostic testing and appropriate treatment. Decisions on how to scale up the coverage of these interventions need to be based on evidence of programme effectiveness, equity and cost-effectiveness. Methods A systematic review of the published literature on the costs and cost-effectiveness of malaria interventions was undertaken. All costs and cost-effectiveness ratios were inflated to 2009 USD to allow comparison of the costs and benefits of several different interventions through various delivery channels, across different geographical regions and from varying costing perspectives. Results Fifty-five studies of the costs and forty three studies of the cost-effectiveness of malaria interventions were identified, 78% of which were undertaken in sub-Saharan Africa, 18% in Asia and 4% in South America. The median financial cost of protecting one person for one year was $2.20 (range $0.88-$9.54 for ITNs, $6.70 (range $2.22-$12.85 for IRS, $0.60 (range $0.48-$1.08 for IPT in infants, $4.03 (range $1.25-$11.80 for IPT in children, and $2.06 (range $0.47-$3.36 for IPT in pregnant women. The median financial cost of diagnosing a case of malaria was $4.32 (range $0.34-$9.34. The median financial cost of treating an episode of uncomplicated malaria was $5.84 (range $2.36-$23.65 and the median financial cost of treating an episode of severe malaria was $30.26 (range $15.64-$137.87. Economies of scale were observed in the implementation of ITNs, IRS and IPT, with lower unit costs reported in studies with larger numbers of beneficiaries. From a provider perspective, the median incremental cost effectiveness ratio per disability adjusted life year averted was $27 (range $8.15-$110 for ITNs, $143 (range $135

  7. Determining the economic cost of ICU treatment: a prospective "micro-costing" study.

    LENUS (Irish Health Repository)

    McLaughlin, Anne Marie

    2012-02-01

    OBJECTIVE: To prospectively assess the cost of patients in an adult intensive care unit (ICU) using bottom-up costing methodology and evaluate the usefulness of "severity of illness" scores in estimating ICU cost. METHODS AND DESIGN: A prospective study costing 64 consecutive admissions over a 2-month period in a mixed medical\\/surgical ICU. RESULTS: The median daily ICU cost (interquartile range, IQR) was 2,205 euro (1,932 euro-3,073 euro), and the median total ICU cost (IQR) was 10,916 euro (4,294 euro-24,091 euro). ICU survivors had a lower median daily ICU cost at 2,164 per day, compared with 3,496 euro per day for ICU non-survivors (P = 0.08). The requirements for continuous haemodiafiltration, blood products and anti-fungal agents were associated with higher daily and overall ICU costs (P = 0.002). Each point increase in SAPS3 was associated with a 305 euro (95% CI 31 euro-579 euro) increase in total ICU cost (P = 0.029). However, SAPS3 accounted for a small proportion of the variance in this model (R (2) = 0.08), limiting its usefulness as a stand-alone predictor of cost in clinical practice. A model including haemodiafiltration, blood products and anti-fungal agents explained 54% of the variance in total ICU cost. CONCLUSION: This bottom-up costing study highlighted the considerable individual variation in costs between ICU patients and identified the major factors contributing to cost. As the requirement for expensive interventions was the main driver for ICU cost, "severity of illness" scores may not be useful as stand-alone predictors of cost in the ICU.

  8. Patient-physician discussions about costs: definitions and impact on cost conversation incidence estimates.

    Science.gov (United States)

    Hunter, Wynn G; Hesson, Ashley; Davis, J Kelly; Kirby, Christine; Williamson, Lillie D; Barnett, Jamison A; Ubel, Peter A

    2016-03-31

    Nearly one in three Americans are financially burdened by their medical expenses. To mitigate financial distress, experts recommend routine physician-patient cost conversations. However, the content and incidence of these conversations are unclear, and rigorous definitions are lacking. We sought to develop a novel set of cost conversation definitions, and determine the impact of definitional variation on cost conversation incidence in three clinical settings. Retrospective, mixed-methods analysis of transcribed dialogue from 1,755 outpatient encounters for routine clinical management of breast cancer, rheumatoid arthritis, and depression, occurring between 2010-2014. We developed cost conversation definitions using summative content analysis. Transcripts were evaluated independently by at least two members of our multi-disciplinary team to determine cost conversation incidence using each definition. Incidence estimates were compared using Pearson's Chi-Square Tests. Three cost conversation definitions emerged from our analysis: (a) Out-of-Pocket (OoP) Cost--discussion of the patient's OoP costs for a healthcare service; (b) Cost/Coverage--discussion of the patient's OoP costs or insurance coverage; (c) Cost of Illness- discussion of financial costs or insurance coverage related to health or healthcare. These definitions were hierarchical; OoP Cost was a subset of Cost/Coverage, which was a subset of Cost of Illness. In each clinical setting, we observed significant variation in the incidence of cost conversations when using different definitions; breast oncology: 16, 22, 24% of clinic visits contained cost conversation (OOP Cost, Cost/Coverage, Cost of Illness, respectively; P cost conversation varied significantly depending on the definition used. Our findings and proposed definitions may assist in retrospective interpretation and prospective design of investigations on this topic.

  9. Activity-based costing methodology as tool for costing in hematopathology laboratory

    Directory of Open Access Journals (Sweden)

    Gujral Sumeet

    2010-01-01

    Full Text Available Background: Cost analysis in laboratories represents a necessary phase in their scientific progression. Aim: To calculate indirect cost and thus total cost per sample of various tests at Hematopathology laboratory (HPL Settings and Design: Activity-based costing (ABC method is used to calculate per cost test of the hematopathology laboratory. Material and Methods: Information is collected from registers, purchase orders, annual maintenance contracts (AMCs, payrolls, account books, hospital bills and registers along with informal interviews with hospital staff. Results: Cost per test decreases as total number of samples increases. Maximum annual expense at the HPL is on reagents and consumables followed by manpower. Cost per test is higher for specialized tests which interpret morphological or flow data and are done by a pathologist. Conclusions: Despite several limitations and assumptions, this was an attempt to understand how the resources are consumed in a large size government-run laboratory. The rate structure needs to be revised for most of the tests, mainly for complete blood counts (CBC, bone marrow examination, coagulation tests and Immunophenotyping. This costing exercise is laboratory specific and each laboratory needs to do its own costing. Such an exercise may help a laboratory redesign its costing structure or at least understand the economics involved in the laboratory management.

  10. Cost-identification analysis of total laryngectomy: an itemized approach to hospital costs.

    Science.gov (United States)

    Dedhia, Raj C; Smith, Kenneth J; Weissfeld, Joel L; Saul, Melissa I; Lee, Steve C; Myers, Eugene N; Johnson, Jonas T

    2011-02-01

    To understand the contribution of intraoperative and postoperative hospital costs to total hospital costs, examine the costs associated with specific hospital services in the postoperative period, and recognize the impact of patient factors on hospital costs. Case series with chart review. Large tertiary care teaching hospital system. Using the Pittsburgh Head and Neck Organ-Specific Database, 119 patients were identified as having total laryngectomy with bilateral selective neck dissection and primary closure from 1999 to 2009. Cost data were obtained for 112 patients. Costs include fixed and variable costs, adjusted to 2010 US dollars using the Consumer Price Index. Mean total hospital costs were $29,563 (range, $10,915 to $120,345). Operating room costs averaged 24% of total hospital costs, whereas room charges, respiratory therapy, laboratory, pharmacy, and radiology accounted for 38%, 14%, 8%, 7%, and 3%, respectively. Median length of stay was 9 days (range, 6-43), and median Charlson comorbidity index score was 8 (2-16). Patients with ≥1 day in the intensive care unit had significantly higher hospital costs ($46,831 vs $24,601, P cost differences with stratification based on previous radiation therapy ($27,598 vs $29,915 with no prior radiation, P = .62) or hospital readmission within 30 days ($29,483 vs $29,609 without readmission, P = .97). This is one of few studies in surgery and the first in otolaryngology to analyze hospital costs for a relatively standardized procedure. Further work will include cost analysis from multiple centers with investigation of global cost drivers.

  11. Causes and remedial measures for construction delays: a case study of pakistan

    International Nuclear Information System (INIS)

    Ali, T.H.; Memon, N.A.

    2009-01-01

    Delays are the most common event that influence the time performance and increase the cost of projects. This paper analyze causes of various delays experienced by three large construction projects in public sector and subsequently to recommend the corrective actions necessitated to safeguard future construction projects from suffering these delays, which result in enormous cost and time over-runs, undermining projects economic viability. The case-study approach has been employed as research method, to analyze construction delays, followed by categorizing them in view of their source. The method employed to collect data included interviews, questionnaire surveys, and analysis of project documents including monthly progress reports, minutes of meeting, and details of correspondence held between the project participants. The data collected was minutely analyzed to identify different delays, and their underlying causes encountered during execution of projects. The analysis reveals serious lapses on part of projects planners, for their failure to take care of the inevitable contingencies (unexpected situations), while conceptualizing projects by resorting to proactive planning at the very outset, incorporating adequate buffers in the projects budgeted costs, and timeframes, to ensure projects economic viability in any eventuality. The failure of owners to establish key performance indicators, followed by their inability in tracking down the indicators, worsened the situation, resulting in projects execution lagging far behind original schedules of construction activities with their estimated costs. (author)

  12. The costs and cost-effectiveness of an integrated sepsis treatment protocol.

    Science.gov (United States)

    Talmor, Daniel; Greenberg, Dan; Howell, Michael D; Lisbon, Alan; Novack, Victor; Shapiro, Nathan

    2008-04-01

    Sepsis is associated with high mortality and treatment costs. International guidelines recommend the implementation of integrated sepsis protocols; however, the true cost and cost-effectiveness of these are unknown. To assess the cost-effectiveness of an integrated sepsis protocol, as compared with conventional care. Prospective cohort study of consecutive patients presenting with septic shock and enrolled in the institution's integrated sepsis protocol. Clinical and economic outcomes were compared with a historical control cohort. Beth Israel Deaconess Medical Center. Overall, 79 patients presenting to the emergency department with septic shock in the treatment cohort and 51 patients in the control group. An integrated sepsis treatment protocol incorporating empirical antibiotics, early goal-directed therapy, intensive insulin therapy, lung-protective ventilation, and consideration for drotrecogin alfa and steroid therapy. In-hospital treatment costs were collected using the hospital's detailed accounting system. The cost-effectiveness analysis was performed from the perspective of the healthcare system using a lifetime horizon. The primary end point for the cost-effectiveness analysis was the incremental cost per quality-adjusted life year gained. Mortality in the treatment group was 20.3% vs. 29.4% in the control group (p = .23). Implementing an integrated sepsis protocol resulted in a mean increase in cost of approximately $8,800 per patient, largely driven by increased intensive care unit length of stay. Life expectancy and quality-adjusted life years were higher in the treatment group; 0.78 and 0.54, respectively. The protocol was associated with an incremental cost of $11,274 per life-year saved and a cost of $16,309 per quality-adjusted life year gained. In patients with septic shock, an integrated sepsis protocol, although not cost-saving, appears to be cost-effective and compares very favorably to other commonly delivered acute care interventions.

  13. Nuclear power after three mile island. Last of four articles

    International Nuclear Information System (INIS)

    Faltermayer, E.

    1979-01-01

    This final and fourth article on nuclear power reviews the March 28, 1979 accident at Three Mile Island-2 Reactor. The most lasting effect will probably be the jarring of the public's confidence and acceptance of nuclear technology. Even before Three Mile Island, electric utilities were starting to desert uranium and switch to coal-fired power plants. Cost overruns, Federal indecision on fuel reprocessing and waste disposal, long licensing procedures, and many other regulatory mandates are cited as deterrents to nuclear power. Coal is the only real alternative for utilities in the U.S., at least for some time to come, even though it is hazardous to mine and dirty to burn. Its use will probably cause far more fatalities than all the nuclear mishaps that may occur. Most unbiased studies indicate economic advantages of nuclear plants over coal-fired plants, even when decommissioning costs are added; it is felt, though, that the somewhat debatable advantages might easily disappear with the new safety and regulatory costs that will be imposed. It remains to be seen how many insurance claims will result from Three Mile Island and whether Congress may raise, or even remove, the controversial $560-million liability limit for nuclear power plants

  14. Designing Cost-Competitive Technology Products through Cost Management

    NARCIS (Netherlands)

    Davila, T.; Wouters, Marc

    2004-01-01

    SYNOPSIS: As manufacturing innovations spread throughout leading organizations, product development becomes a more important source of competitive advantage. Within product development, cost management receives increasing attention. To date, cost management in new product development focuses

  15. Costs of employee turnover

    Directory of Open Access Journals (Sweden)

    Jiří Duda

    2013-01-01

    Full Text Available The aim of this paper is to establish a general methodology for calculating the costs incurred by employee turnover. This paper deals with identification of costs incurred by the departure of an employee, and does not deal with the cost of recruitment of a new employee. Economic calculations are adjusted to the tax policy in the Czech Republic. The costs of employee turnover (according to Bliss, 2012 include the costs of substitution of the unoccupied position, costs of conducting the exit interview and termination of the contract. The cost of an executive’s time to understand the causes of leaving and costs of the leaving employee’s training were also determined. Important factors in the costs of employee turnover also include the loss of knowledge and possibly also a loss of customers. Costs of lost employee and department productiveness represent an important part of the costs of employee turnover, as well. For all of these costs there have been proposed general calculations formulas.

  16. Equipment cost optimization

    International Nuclear Information System (INIS)

    Ribeiro, E.M.; Farias, M.A.; Dreyer, S.R.B.

    1995-01-01

    Considering the importance of the cost of material and equipment in the overall cost profile of an oil company, which in the case of Petrobras, represents approximately 23% of the total operational cost or 10% of the sales, an organization for the optimization of such costs has been established within Petrobras. Programs are developed aiming at: optimization of life-cycle cost of material and equipment; optimization of industrial processes costs through material development. This paper describes the methodology used in the management of the development programs and presents some examples of concluded and ongoing programs, which are conducted in permanent cooperation with suppliers, technical laboratories and research institutions and have been showing relevant results

  17. Peranan Metode Activity Based Costing Dalam Menentukan Cost of Goods Manufactured

    OpenAIRE

    Martusa, Riki; Darma, Stephanus Ryan; Carolina, Verani

    2011-01-01

    The purpose of this research is to know production process of a textile company in Bandung and to analyze the comparison between cost of goods manufactured calculation methods, that applied in the company (traditional costing method) and Activity Based Costing (ABC) method. The obatained data was performed monthly during the year 2009. Based on analysis result, Cost Of Goods Manufactured calculation for unpattern material using ABC method resulted the Cost Of Goods Manufactured that is lower ...

  18. Cost of photovoltaic energy systems as determined by balance-of-system costs

    Science.gov (United States)

    Rosenblum, L.

    1978-01-01

    The effect of the balance-of-system (BOS), i.e., the total system less the modules, on photo-voltaic energy system costs is discussed for multikilowatt, flat-plate systems. Present BOS costs are in the range of 10 to 16 dollars per peak watt (1978 dollars). BOS costs represent approximately 50% of total system cost. The possibility of future BOS cost reduction is examined. It is concluded that, given the nature of BOS costs and the lack of comprehensive national effort focussed on cost reduction, it is unlikely that BOS costs will decline greatly in the next several years. This prognosis is contrasted with the expectations of the Department of Energy National Photovoltaic Program goals and pending legislation in the Congress which require a BOS cost reduction of an order of magnitude or more by the mid-1980s.

  19. Impact of Costing and Cost Analysis Methods on the Result of the Period: Methods Based on Partial Cost Theory

    Directory of Open Access Journals (Sweden)

    Toma Maria

    2017-01-01

    Looking from this perspective, in the present paper we have proposed that objectives, to approach the full cost calculation methods based on partial costs (direct-costing on the product or direct-costing evolved, and comparing them to determine the effect they have on the outcome of the period.

  20. Troubleshooting Costs

    Science.gov (United States)

    Kornacki, Jeffrey L.

    Seventy-six million cases of foodborne disease occur each year in the United States alone. Medical and lost productivity costs of the most common pathogens are estimated to be 5.6-9.4 billion. Product recalls, whether from foodborne illness or spoilage, result in added costs to manufacturers in a variety of ways. These may include expenses associated with lawsuits from real or allegedly stricken individuals and lawsuits from shorted customers. Other costs include those associated with efforts involved in finding the source of the contamination and eliminating it and include time when lines are shut down and therefore non-productive, additional non-routine testing, consultant fees, time and personnel required to overhaul the entire food safety system, lost market share to competitors, and the cost associated with redesign of the factory and redesign or acquisition of more hygienic equipment. The cost associated with an effective quality assurance plan is well worth the effort to prevent the situations described.

  1. 48 CFR 9904.406 - Cost accounting standard-cost accounting period.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard-cost accounting period. 9904.406 Section 9904.406 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT...

  2. How rebates, copayments, and administration costs affect the cost-effectiveness of osteoporosis therapies.

    Science.gov (United States)

    Ferko, Nicole C; Borisova, Natalie; Airia, Parisa; Grima, Daniel T; Thompson, Melissa F

    2012-11-01

    Because of rising drug expenditures, cost considerations have become essential, necessitating the requirement for cost-effectiveness analyses for managed care organizations (MCOs). The study objective is to examine the impact of various drug-cost components, in addition to wholesale acquisition cost (WAC), on the cost-effectiveness of osteoporosis therapies. A Markov model of osteoporosis was used to exemplify different drug cost scenarios. We examined the effect of varying rebates for oral bisphosphonates--risedronate and ibandronate--as well as considering the impact of varying copayments and administration costs for intravenous zoledronate. The population modeled was 1,000 American women, > or = 50 years with osteoporosis. Patients were followed for 1 year to reflect an annual budget review of formularies by MCOs. The cost of therapy was based on an adjusted WAC, and is referred to as net drug cost. The total annual cost incurred by an MCO for each drug regimen was calculated using the net drug cost and fracture cost. We estimated cost on a quality adjusted life year (QALY) basis. When considering different rebates, results for risedronate versus ibandronate vary from cost-savings (i.e., costs less and more effective) to approximately $70,000 per QALY. With no risedronate rebate, an ibandronate rebate of approximately 65% is required before cost per QALY surpasses $50,000. With rebates greater than 25% for risedronate, irrespective of ibandronate rebates, results become cost-saving. Results also showed the magnitude of cost savings to the MCO varied by as much as 65% when considering no administration cost and the highest coinsurance rate for zoledronate. Our study showed that cost-effectiveness varies considerably when factors in addition to the WAC are considered. This paper provides recommendations for pharmaceutical manufacturers and MCOs when developing and interpreting such analyses.

  3. Costs and cost-effectiveness of pediatric inguinal hernia repair in Uganda.

    Science.gov (United States)

    Eeson, Gareth; Birabwa-Male, Doreen; Pennington, Mark; Blair, Geoffrey K

    2015-02-01

    Surgically treatable diseases contribute approximately 11% of disability-adjusted life years (DALYs) worldwide yet they remain a neglected public health priority in low- and middle-income countries (LMICs). Pediatric inguinal hernia is the most common congenital abnormality in newborns and a major cause of morbidity and mortality yet elective repair remains largely unavailable in LMICs. This study is aimed to determine the costs and cost-effectiveness of pediatric inguinal hernia repair (PIHR) in a low-resource setting. Medical costs of consecutive elective PIHRs were recorded prospectively at two centers in Uganda. Decision modeling was used to compare two different treatment scenarios (adoption of PIHR and non-adoption) from a provider perspective. A Markov model was constructed to estimate health outcomes under each scenario. The robustness of the cost-effectiveness results in the base case analysis was tested in one-way and probabilistic sensitivity analysis. The primary outcome of interest was cost per DALY averted by the intervention. Sixty-nine PIHRs were performed in 65 children (mean age 3.6 years). Mean cost per procedure was $86.68 US (95% CI 83.1-90.2 USD) and averted an average of 5.7 DALYs each. Incremental cost-effectiveness ratio was $12.41 per DALY averted. The probability of cost-effectiveness was 95% at a cost-effectiveness threshold of $35 per averted DALY. Results were robust to sensitivity analysis under all considered scenarios. Elective PIHR is highly cost-effective for the treatment and prevention of complications of hernia disease even in low-resource settings. PIHR should be prioritized in LMICs alongside other cost-effective interventions.

  4. Validation of the OpCost logging cost model using contractor surveys

    Science.gov (United States)

    Conor K. Bell; Robert F. Keefe; Jeremy S. Fried

    2017-01-01

    OpCost is a harvest and fuel treatment operations cost model developed to function as both a standalone tool and an integrated component of the Bioregional Inventory Originated Simulation Under Management (BioSum) analytical framework for landscape-level analysis of forest management alternatives. OpCost is an updated implementation of the Fuel Reduction Cost Simulator...

  5. Financing a nuclear programme

    International Nuclear Information System (INIS)

    Cameron, R.

    2010-10-01

    Nuclear power plant construction projects have many characteristics in common with other types of large infrastructure investment, both within the power generation sector and elsewhere. However, nuclear power itself has special features that can make nuclear financing particularly challenging. These features include the high capital cost, the relatively long period required to recoup investments, the often controversial nature of nuclear projects. The need for clear solutions and financing schemes for radioactive waste management and decommissioning and the need for nuclear power plants to operate at high capacity factors, preferably under base load conditions. During the previous major expansion of nuclear power in the 1970 and 1980, many nuclear projects suffered very large construction delays and cost overruns. The legacy of such problems increases the risks perceived by potential investors. A recent study undertaken jointly by the Iea and the Nea showed that the competitiveness of nuclear power strongly depends on the cost of financing due to the high share of fixed capital costs in the total lifetime costs of nuclear power. A key issue in this context is the long-term predictability of carbon pricing arrangements, which, for the time being and despite positive evolutions in this respect, most notably in Europe, does not yet exist. This paper will consider how the risks can be mitigated and examine in detail various models for corporate finance and the role of government assistance in providing a suitable financial basis. (Author)

  6. Cost/CYP: a bottom line that helps keep CSM projects cost-efficient.

    Science.gov (United States)

    1985-01-01

    In contraceptive social marketing (CSM), the objective is social good, but project managers also need to run a tight ship, trimming costs, allocating scarce funds, and monitoring their program's progress. 1 way CSM managers remain cost-conscious is through the concept of couple-years-of-protection (CYP). Devised 2 decades ago as an administrative tool to compare the effects of different contraceptive methods, CYP's uses have multiplied to include assessing program output and cost effectiveness. Some of the factors affecting cost/CYP are a project's age, sales volume, management efficiency, and product prices and line. These factors are interconnected. The cost/CYP figures given here do not include outlays for commodities. While the Agency for International Development's commodity costs alter slightly with each new purchase contrast, the agency reports that a condom costs about 4 cents (US), an oral contraceptive (OC) cycle about 12 cents, and a spermicidal tablet about 7 cents. CSM projects have relatively high start-up costs. Within a project's first 2 years, expenses must cover such marketing activities as research, packaging, warehousing, and heavy promotion. As a project ages, sales should grow, producing revenues that gradually amortize these initial costs. The Nepal CSM project provides an example of how cost/CYP can improve as a program ages. In 1978, the year sales began, the project's cost/CYP was about $84. For some time the project struggled to get its products to its target market and gradually overcome several major hurdles. The acquisition of jeeps eased distribution and, by adding another condom brand, sales were increased still more, bringing the cost/CYP down to $8.30 in 1981. With further sales increases and resulting revenues, the cost/CYP dropped to just over $7 in 1983. When the sales volume becomes large enough, CSM projects can achieve economies of scale, which greatly improves cost-efficiency. Fixed costs shrink as a proportion of total

  7. Fusion reactor design studies: standard unit costs and cost scaling rules

    International Nuclear Information System (INIS)

    Schulte, S.C.; Bickford, W.E.; Willingham, C.E.; Ghose, S.K.; Walker, M.G.

    1979-09-01

    This report establishes standard unit costs and scaling rules for estimating costs of material, equipment, land, and labor components used in magnetic confinement fusion reactor plant construction and operation. Use of the standard unit costs and scaling rules will add uniformity to cost estimates, and thus allow valid comparison of the economic characteristics of various reactor concepts

  8. Standardisation of costs: the Dutch Manual for Costing in economic evaluations.

    Science.gov (United States)

    Oostenbrink, Jan B; Koopmanschap, Marc A; Rutten, Frans F H

    2002-01-01

    The lack of a uniform costing methodology is often considered a weakness of economic evaluations that hinders the interpretation and comparison of studies. Standardisation is therefore an important topic within the methodology of economic evaluations and in national guidelines that formulate the formal requirements for studies to be considered when deciding on the reimbursement of new medical therapies. Recently, the Dutch Manual for Costing: Methods and Standard Costs for Economic Evaluations in Health Care (further referred to as "the manual") has been published, in addition to the Dutch guidelines for pharmacoeconomic research. The objectives of this article are to describe the main content of the manual and to discuss some key issues of the manual in relation to the standardisation of costs. The manual introduces a six-step procedure for costing. These steps concern: the scope of the study;the choice of cost categories;the identification of units;the measurement of resource use;the monetary valuation of units; andthe calculation of unit costs. Each step consists of a number of choices and these together define the approach taken. In addition to a description of the costing process, five key issues regarding the standardisation of costs are distinguished. These are the use of basic principles, methods for measurement and valuation, standard costs (average prices of healthcare services), standard values (values that can be used within unit cost calculations), and the reporting of outcomes. The use of the basic principles, standard values and minimal requirements for reporting outcomes, as defined in the manual, are obligatory in studies that support submissions to acquire reimbursement for new pharmaceuticals. Whether to use standard costs, and the choice of a particular method to measure or value costs, is left mainly to the investigator, depending on the specific study setting. In conclusion, several instruments are available to increase standardisation in

  9. Teacher Costs

    OpenAIRE

    DINIS MOTA DA COSTA PATRICIA; DE SOUSA LOBO BORGES DE ARAUJO LUISA

    2015-01-01

    The purpose of this technical brief is to assess current methodologies for the collection and calculation of teacher costs in European Union (EU) Member States in view of improving data series and indicators related to teacher salaries and teacher costs. To this end, CRELL compares the Eurydice collection on teacher salaries with the similar Organisation for Economic Co-operation and Development (OECD) data collection and calculates teacher costs based on the methodology established by Statis...

  10. Department of Energy Environmental Management cost infrastructure development program: Cost analysis requirements

    International Nuclear Information System (INIS)

    Custer, W.R. Jr.; Messick, C.D.

    1996-01-01

    This report was prepared to support development of the Department of Energy Environmental Management cost infrastructure -- a new capability to independently estimate and analyze costs. Currently, the cost data are reported according to a structure that blends level of effort tasks with product and process oriented tasks. Also. the budgetary inputs are developed from prior year funding authorizations and from contractor-developed parametric estimates that have been adjusted to planned funding levels or appropriations. Consequently, it is difficult for headquarters and field-level activities to use actual cost data and technical requirements to independently assess the costs generated and identify trends, potential cost savings from process improvements, and cost reduction strategies

  11. APT cost scaling: Preliminary indications from a Parametric Costing Model (PCM)

    International Nuclear Information System (INIS)

    Krakowski, R.A.

    1995-01-01

    A Parametric Costing Model has been created and evaluate as a first step in quantitatively understanding important design options for the Accelerator Production of Tritium (APT) concept. This model couples key economic and technical elements of APT in a two-parameter search of beam energy and beam power that minimizes costs within a range of operating constraints. The costing and engineering depth of the Parametric Costing Model is minimal at the present open-quotes entry levelclose quotes, and is intended only to demonstrate a potential for a more-detailed, cost-based integrating design tool. After describing the present basis of the Parametric Costing Model and giving an example of a single parametric scaling run derived therefrom, the impacts of choices related to resistive versus superconducting accelerator structures and cost of electricity versus plant availability (open-quotes load curveclose quotes) are reported. Areas of further development and application are suggested

  12. Commercial Vessel Safety. Economic Costs. Appendix A. Estimation Procedures for Costs and Cost Impacts of Marine Safety Regulations.

    Science.gov (United States)

    1979-12-01

    Subsistence: Includes the cost of all edibles , sales taxes, delivery charges, and loading costs. Stores, Supplies, and Equipment: The cost of all...consumable stores, supplies, and expendable equipment other than edibles , fuel, and water. 89 Insurance: Annual cost for H&M, P&I, and port risk for the...Products (50) 3441 3442 3444 3446 3449 105 Screw Machine Products (51) 3450 106 Metal Stampings (51) 3460 107 Cutlery , Hand Tools, Hardware (52) 3420

  13. Comparing the cost-per-QALYs gained and cost-per-DALYs averted literatures.

    Science.gov (United States)

    Neumann, Peter J; Anderson, Jordan E; Panzer, Ari D; Pope, Elle F; D'Cruz, Brittany N; Kim, David D; Cohen, Joshua T

    2018-01-18

    Background : We examined the similarities and differences between studies using two common metrics used in cost-effectiveness analyses (CEAs): cost per quality-adjusted life years (QALYs) gained and cost per disability-adjusted life year (DALY) averted. Methods : We used the Tufts Medical Center CEA Registry, which contains English-language cost-per-QALY gained studies, and  Global Cost-Effectiveness Analysis (GHCEA) Registry, which contains cost-per-DALY averted studies. We examined study characteristics including intervention type, sponsor, country, and primary disease, and also analysed the number of CEAs versus disease burden estimates for major diseases and conditions across three geographic regions. Results : We identified 6,438 cost-per-QALY and 543 cost-per-DALY studies published through 2016 and observed rapid growth in publication rates for both literatures. Cost-per-QALY studies were most likely to examine pharmaceuticals and interventions in high-income countries. Cost-per-DALY studies predominantly focused on infectious disease interventions and interventions in low and lower-middle income countries. We found discrepancies in the number of published CEAs for certain diseases and conditions in certain regions, suggesting "under-studied" areas (e.g., cardiovascular disease in Southeast Asia, East Asia, and Oceania and "overstudied" areas (e.g., HIV in Sub Saharan Africa) relative to disease burden in those regions. Conclusions : The number of cost-per QALY and cost-per-DALY analyses has grown rapidly with applications to diverse interventions and diseases.  Discrepancies between the number of published studies and disease burden suggest funding opportunities for future cost-effectiveness research.

  14. Cost of stroke

    DEFF Research Database (Denmark)

    Jennum, Poul; Iversen, Helle K; Ibsen, Rikke

    2015-01-01

    . The attributable cost of direct net health care costs after the stroke (general practitioner services, hospital services, and medication) and indirect costs (loss of labor market income) were €10,720, €8,205 and €7,377 for patients, and €989, €1,544 and €1.645 for their partners, over and above that of controls......BACKGROUND: To estimate the direct and indirect costs of stroke in patients and their partners. DESCRIPTION: Direct and indirect costs were calculated using records from the Danish National Patient Registry from 93,047 ischemic, 26,012 hemorrhagic and 128,824 unspecified stroke patients...

  15. The disarmament cost

    International Nuclear Information System (INIS)

    Cattaneo, M.

    1996-01-01

    War is costly. But peace cost is even higher. The destruction of weapons (mines, nuclear weapons, chemical weapons) is much more expensive than their manufacturing. The soldiers demobilization cost is enormous, for instance in Angola, Mozambique, Nicaragua, Zimbabwe the demobilization of 270000 soldiers cost 2.5 10 9 francs. The measures intended to reduce the war risk are also expensive. That is why the arsenal of ex USSR is still intact. Today no international agency is entirely dedicated to peace building. The question is how would cost such an agency? (O.L.). 5 refs., 2 figs

  16. Cost of Sawing Timber (COST) Module (Version 1.0) for Windows®

    Science.gov (United States)

    A. Jefferson, Jr. Palmer; Janice K. Wiedenbeck; Robert W. Mayer; Robert W. Mayer

    2005-01-01

    The Cost of Sawing Timber (COST) Module calculates the cost of operations per minute and per thousand board feet for a hardwood sawmill. It may be used independently or as a source of cost information for use in sawmill efficiency software such as the SOLVE program. Cost figures are calculated on the basis of information entered by the user. Sawmill managers use these...

  17. Determination of chest x-ray cost using activity based costing ...

    African Journals Online (AJOL)

    Background: Activity based costing (ABC) is an approach to get insight of true costs and to solve accounting problems. It provides more accurate information on product cost than conventional accounting system. The purpose of this study was to identify detailed resource consumption for chest x-ray procedure. Methods: ...

  18. [Cost of therapy for neurodegenerative diseases. Applying an activity-based costing system].

    Science.gov (United States)

    Sánchez-Rebull, María-Victoria; Terceño Gómez, Antonio; Travé Bautista, Angeles

    2013-01-01

    To apply the activity based costing (ABC) model to calculate the cost of therapy for neurodegenerative disorders in order to improve hospital management and allocate resources more efficiently. We used the case study method in the Francolí long-term care day center. We applied all phases of an ABC system to quantify the cost of the activities developed in the center. We identified 60 activities; the information was collected in June 2009. The ABC system allowed us to calculate the average cost per patient with respect to the therapies received. The most costly and commonly applied technique was psycho-stimulation therapy. Focusing on this therapy and on others related to the admissions process could lead to significant cost savings. ABC costing is a viable method for costing activities and therapies in long-term day care centers because it can be adapted to their structure and standard practice. This type of costing allows the costs of each activity and therapy, or combination of therapies, to be determined and aids measures to improve management. Copyright © 2012 SESPAS. Published by Elsevier Espana. All rights reserved.

  19. Time and travel costs incurred by women attending antenatal tests: A costing study.

    Science.gov (United States)

    Verhoef, Talitha I; Daley, Rebecca; Vallejo-Torres, Laura; Chitty, Lyn S; Morris, Stephen

    2016-09-01

    to estimate the costs to women, their friends and family for different antenatal tests in the Down's syndrome (DS) screening pathway. questionnaire-based costing study. eight maternity clinics across the UK. pregnant women (n=574) attending an appointment for DS screening, NIPT or invasive testing between December 2013 and September 2014. using data collected from the questionnaires we calculated the total costs to women by multiplying the time spent at the hospital and travelling to and from it by the opportunity costs of the women and accompanying person and adding travel and childcare costs. Assumptions about the value of opportunity costs were tested in one-way sensitivity analyses. The main outcome measure was the mean cost to the women and friends/family for each test (DS screening, NIPT, and invasive testing). mean costs to women and their family/friend were £33.96 per visit, of which £22.47 were time costs, £9.15 were travel costs and £2.34 were childcare costs. Costs were lowest for NIPT (£22), £32 for DS screening (£44 if combined with NIPT), and highest for invasive testing (£60). Sensitivity analysis revealed that variations around the value of leisure time opportunity costs had the largest influence on the results. there are considerable costs to women, their friends and family when attending different tests in the DS screening pathway. when assessing the cost-effectiveness of changes to this pathway, costs to women should be considered. Copyright © 2016 Elsevier Ltd. All rights reserved.

  20. Photovoltaic energy cost limit

    International Nuclear Information System (INIS)

    Coiante, D.

    1992-01-01

    Referring to a photovoltaic system for grid connected applications, a parametric expression of kWh cost is derived. The limit of kWh cost is carried out extrapolating the values of cost components to their lowest figure. The reliability of the forecast is checked by disaggregating kWh cost in direct and indirect costs and by discussing the possible cost reduction of each component

  1. Application of the Activity-Based Costing Method for Unit-Cost Calculation in a Hospital

    Science.gov (United States)

    Javid, Mahdi; Hadian, Mohammad; Ghaderi, Hossein; Ghaffari, Shahram; Salehi, Masoud

    2016-01-01

    Background: Choosing an appropriate accounting system for hospital has always been a challenge for hospital managers. Traditional cost system (TCS) causes cost distortions in hospital. Activity-based costing (ABC) method is a new and more effective cost system. Objective: This study aimed to compare ABC with TCS method in calculating the unit cost of medical services and to assess its applicability in Kashani Hospital, Shahrekord City, Iran. Methods: This cross-sectional study was performed on accounting data of Kashani Hospital in 2013. Data on accounting reports of 2012 and other relevant sources at the end of 2012 were included. To apply ABC method, the hospital was divided into several cost centers and five cost categories were defined: wage, equipment, space, material, and overhead costs. Then activity centers were defined. ABC method was performed into two phases. First, the total costs of cost centers were assigned to activities by using related cost factors. Then the costs of activities were divided to cost objects by using cost drivers. After determining the cost of objects, the cost price of medical services was calculated and compared with those obtained from TCS. Results: The Kashani Hospital had 81 physicians, 306 nurses, and 328 beds with the mean occupancy rate of 67.4% during 2012. Unit cost of medical services, cost price of occupancy bed per day, and cost per outpatient service were calculated. The total unit costs by ABC and TCS were respectively 187.95 and 137.70 USD, showing 50.34 USD more unit cost by ABC method. ABC method represented more accurate information on the major cost components. Conclusion: By utilizing ABC, hospital managers have a valuable accounting system that provides a true insight into the organizational costs of their department. PMID:26234974

  2. Application of the Activity-Based Costing Method for Unit-Cost Calculation in a Hospital.

    Science.gov (United States)

    Javid, Mahdi; Hadian, Mohammad; Ghaderi, Hossein; Ghaffari, Shahram; Salehi, Masoud

    2015-05-17

    Choosing an appropriate accounting system for hospital has always been a challenge for hospital managers. Traditional cost system (TCS) causes cost distortions in hospital. Activity-based costing (ABC) method is a new and more effective cost system. This study aimed to compare ABC with TCS method in calculating the unit cost of medical services and to assess its applicability in Kashani Hospital, Shahrekord City, Iran.‎ This cross-sectional study was performed on accounting data of Kashani Hospital in 2013. Data on accounting reports of 2012 and other relevant sources at the end of 2012 were included. To apply ABC method, the hospital was divided into several cost centers and five cost categories were defined: wage, equipment, space, material, and overhead costs. Then activity centers were defined. ABC method was performed into two phases. First, the total costs of cost centers were assigned to activities by using related cost factors. Then the costs of activities were divided to cost objects by using cost drivers. After determining the cost of objects, the cost price of medical services was calculated and compared with those obtained from TCS.‎ The Kashani Hospital had 81 physicians, 306 nurses, and 328 beds with the mean occupancy rate of 67.4% during 2012. Unit cost of medical services, cost price of occupancy bed per day, and cost per outpatient service were calculated. The total unit costs by ABC and TCS were respectively 187.95 and 137.70 USD, showing 50.34 USD more unit cost by ABC method. ABC method represented more accurate information on the major cost components. By utilizing ABC, hospital managers have a valuable accounting system that provides a true insight into the organizational costs of their department.

  3. VISIBLE COSTS AND HIDDEN COSTS IN THE BAKING INDUSTRY

    Directory of Open Access Journals (Sweden)

    Criveanu Maria

    2013-04-01

    Full Text Available Hidden costs are present in the activity of any company, hardly identified in the traditional administrative accounting. The high levels of the hidden costs and their unknown presence have serious consequences on the decisions made by the managers. This paper aims at presenting some aspects related to the hidden costs that occur in the activity of the companies in the baking industry and the possibilities to reduce their level.

  4. Calculating the Unit Cost Factors for Decommissioning Cost Estimation of the Nuclear Research Reactor

    International Nuclear Information System (INIS)

    Jeong, Kwan Seong; Lee, Dong Gyu; Jung, Chong Hun; Lee, Kune Woo

    2006-01-01

    The estimated decommissioning cost of nuclear research reactor is calculated by applying a unit cost factor-based engineering cost calculation method on which classification of decommissioning works fitted with the features and specifications of decommissioning objects and establishment of composition factors are based. Decommissioning cost of nuclear research reactor is composed of labor cost, equipment and materials cost. Labor cost of decommissioning costs in decommissioning works are calculated on the basis of working time consumed in decommissioning objects. In this paper, the unit cost factors and work difficulty factors which are needed to calculate the labor cost in estimating decommissioning cost of nuclear research reactor are derived and figured out.

  5. Office Computers: Ergonomic Considerations.

    Science.gov (United States)

    Ganus, Susannah

    1984-01-01

    Each new report of the office automation market indicates technology is overrunning the office. The impacts of this technology are described and some ways to manage and physically "soften" the change to a computer-based office environment are suggested. (Author/MLW)

  6. Drilling cost analysis

    International Nuclear Information System (INIS)

    Anand, A.B.

    1992-01-01

    Drilling assumes greater importance in present day uranium exploration which emphasizes to explore more areas on the basis of conceptual model than merely on surface anomalies. But drilling is as costly as it is important and consumes a major share (50% to 60%) of the exploration budget. As such the cost of drilling has great bearing on the exploration strategy as well as on the overall cost of the project. Therefore, understanding the cost analysis is very much important when planning or intensifying an exploration programme. This not only helps in controlling the current operations but also in planning the budgetary provisions for future operations. Also, if the work is entrusted to a private party, knowledge of in-house cost analysis helps in fixing the rates of drilling in different formations and areas to be drilled. Under this topic, various factors that contribute to the cost of drilling per meter as well as ways to minimize the drilling cost for better economic evaluation of mineral deposits are discussed. (author)

  7. Reducing Operating Room Costs Through Real-Time Cost Information Feedback: A Pilot Study.

    Science.gov (United States)

    Tabib, Christian H; Bahler, Clinton D; Hardacker, Thomas J; Ball, Kevin M; Sundaram, Chandru P

    2015-08-01

    To create a protocol for providing real-time operating room (OR) cost feedback to surgeons. We hypothesize that this protocol will reduce costs in a responsible way without sacrificing quality of care. All OR costs were obtained and recorded for robot-assisted partial nephrectomy and laparoscopic donor nephrectomy. Before the beginning of this project, costs pertaining to the 20 most recent cases were analyzed. Items were identified from previous cases as modifiable for replacement or omission. Timely feedback of total OR costs and cost of each item used was provided to the surgeon after each case, and costs were analyzed. A cost analysis of the robot-assisted partial nephrectomy before the washout period indicates expenditures of $5243.04 per case. Ten recommended modifiable items were found to have an average per case cost of $1229.33 representing 23.4% of the total cost. A postwashout period cost analysis found the total OR cost decreased by $899.67 (17.2%) because of changes directly related to the modifiable items. Therefore, 73.2% of the possible identified savings was realized. The same stepwise approach was applied to laparoscopic donor nephrectomies. The average total cost per case before the washout period was $3530.05 with $457.54 attributed to modifiable items. After the washout period, modifiable items costs were reduced by $289.73 (8.0%). No complications occurred in the donor nephrectomy cases while one postoperative complication occurred in the partial nephrectomy group. Providing surgeons with feedback related to OR costs may lead to a change in surgeon behavior and decreased overall costs. Further studies are needed to show equivalence in patient outcomes.

  8. Impacts of nuclear fuel cycle costs on nuclear power generating costs

    International Nuclear Information System (INIS)

    Bertel, E.; Naudet, G.

    1989-01-01

    Fuel cycle costs are one of the main parameters to evaluate the competitiveness of various nuclear strategies. The historical analysis based on the French case shows the good performances yet achieved in mastering elementary costs in order to limit global fuel cycle cost escalation. Two contrasted theoretical scenarios of costs evolution in the middle and long term have been determined, based upon market analysis and technological improvements expected. They are used to calculate the global fuel cycle costs for various fuel management options and for three strategies of nuclear deployment. The results illustrate the stability of the expected fuel cycle costs over the long term, to be compared to the high incertainty prevailing for fossil fueled plants. The economic advantages of advanced technologies such as MOX fueled PWRs are underlined

  9. The relationships between OHS prevention costs, safety performance, employee satisfaction and accident costs.

    Science.gov (United States)

    Bayram, Metin; Ünğan, Mustafa C; Ardıç, Kadir

    2017-06-01

    Little is known about the costs of safety. A literature review conducted for this study indicates there is a lack of survey-based research dealing with the effects of occupational health and safety (OHS) prevention costs. To close this gap in the literature, this study investigates the interwoven relationships between OHS prevention costs, employee satisfaction, OHS performance and accident costs. Data were collected from 159 OHS management system 18001-certified firms operating in Turkey and analyzed through structural equation modeling. The findings indicate that OHS prevention costs have a significant positive effect on safety performance, employee satisfaction and accident costs savings; employee satisfaction has a significant positive effect on accident costs savings; and occupational safety performance has a significant positive effect on employee satisfaction and accident costs savings. Also, the results indicate that safety performance and employee satisfaction leverage the relationship between prevention costs and accident costs.

  10. Minimum cost connection networks

    DEFF Research Database (Denmark)

    Hougaard, Jens Leth; Tvede, Mich

    2015-01-01

    In the present paper we consider the allocation of costs in connection networks. Agents have connection demands in form of pairs of locations they want to have connected. Connections between locations are costly to build. The problem is to allocate costs of networks satisfying all connection...... demands. We use a few axioms to characterize allocation rules that truthfully implement cost minimizing networks satisfying all connection demands in a game where: (1) a central planner announces an allocation rule and a cost estimation rule; (2) every agent reports her own connection demand as well...... as all connection costs; (3) the central planner selects a cost minimizing network satisfying reported connection demands based on the estimated costs; and, (4) the planner allocates the true costs of the selected network. It turns out that an allocation rule satisfies the axioms if and only if relative...

  11. Measuring the Cost of the Patient-Centered Medical Home: A Cost-Accounting Approach.

    Science.gov (United States)

    Lieberthal, Robert D; Payton, Colleen; Sarfaty, Mona; Valko, George

    To explore the cost for individual practices to become more patient-centered, we inventoried and calculated the cost of costly activities involved in implementing the Patient-Centered Medical Home (PCMH) as defined by the National Committee for Quality Assurance. There were 3 key findings. The cost of each PCMH-related clinical activity can be classified in 1 of 3 major categories. Cost offsets can be used to defray part of the cost recognition. The cost of PCMH transformation varied by practice with no clear level or pattern of costs. Our study suggests that small- and medium-sized practices may experience difficulty with the financial burden of PCMH recognition.

  12. Cost management in the internal value chain of integrated application of activity-based costing, Kaizen concept and target costing

    Directory of Open Access Journals (Sweden)

    Pešić-Tomić Vesna

    2014-01-01

    Full Text Available The objective of this paper is an effort to view the possibilities of integrated use of target costing, activity based costing and Kaizen concept in the internal value chain as the central link of the entire chain. The idea is to stimulate the company management to think about the costs, position they take in the structure of price cost and their influence on forming the sales price since it is very important to produce right product for the consumer, of desired quality and functionality but along with as low production costs as possible. It is therefore needed to construct the right design of a product and provide its production at the shortest possible time along with as low costs as possible which will impact the efficiency of the entire value chain.

  13. Costs of fire suppression forces based on cost-aggregation approach

    Science.gov (United States)

    Gonz& aacute; lez-Cab& aacute; Armando n; Charles W. McKetta; Thomas J. Mills

    1984-01-01

    A cost-aggregation approach has been developed for determining the cost of Fire Management Inputs (FMls)-the direct fireline production units (personnel and equipment) used in initial attack and large-fire suppression activities. All components contributing to an FMI are identified, computed, and summed to estimate hourly costs. This approach can be applied to any FMI...

  14. Lamb Production Costs: Analyses of Composition and Elasticities Analysis of Lamb Production Costs

    Directory of Open Access Journals (Sweden)

    C. Raineri

    2015-08-01

    Full Text Available Since lamb is a commodity, producers cannot control the price of the product they sell. Therefore, managing production costs is a necessity. We explored the study of elasticities as a tool for basing decision-making in sheep production, and aimed at investigating the composition and elasticities of lamb production costs, and their influence on the performance of the activity. A representative sheep production farm, designed in a panel meeting, was the base for calculation of lamb production cost. We then performed studies of: i costs composition, and ii cost elasticities for prices of inputs and for zootechnical indicators. Variable costs represented 64.15% of total cost, while 21.66% were represented by operational fixed costs, and 14.19% by the income of the factors. As for elasticities to input prices, the opportunity cost of land was the item to which production cost was more sensitive: a 1% increase in its price would cause a 0.2666% increase in lamb cost. Meanwhile, the impact of increasing any technical indicator was significantly higher than the impact of rising input prices. A 1% increase in weight at slaughter, for example, would reduce total cost in 0.91%. The greatest obstacle to economic viability of sheep production under the observed conditions is low technical efficiency. Increased production costs are more related to deficient zootechnical indexes than to high expenses.

  15. Valuing productivity costs in a changing macroeconomic environment: the estimation of colorectal cancer productivity costs using the friction cost approach.

    Science.gov (United States)

    Hanly, Paul; Koopmanschap, Marc; Sharp, Linda

    2016-06-01

    The friction cost approach (FCA) has been proposed as an alternative to the human capital approach for productivity cost valuation. However, FCA estimates are context dependent and influenced by extant macroeconomic conditions. We applied the FCA to estimate colorectal cancer labor productivity costs and assessed the impact of a changing macroeconomic environment on these estimates. Data from colorectal cancer survivors (n = 159) derived from a postal survey undertaken in Ireland March 2010 to January 2011 were combined with national wage data, population-level survival data, and occupation-specific friction periods to calculate temporary and permanent disability, and premature mortality costs using the FCA. The effects of changing labor market conditions between 2006 and 2013 on the friction period were modeled in scenario analyses. Costs were valued in 2008 euros. In the base-case, the total FCA per-person productivity cost for incident colorectal cancer patients of working age at diagnosis was €8543. In scenario 1 (a 2.2 % increase in unemployment), the fall in the friction period caused total productivity costs to decrease by up to 18 % compared to base-case estimates. In scenario 2 (a 9.2 % increase in unemployment), the largest decrease in productivity cost was up to 65 %. Adjusting for the vacancy rate reduced the effect of unemployment on the cost results. The friction period used in calculating labor productivity costs greatly affects the derived estimates; this friction period requires reassessment following changes in labor market conditions. The influence of changes in macroeconomic conditions on FCA-derived cost estimates may be substantial.

  16. Integrated analysis considered mitigation cost, damage cost and adaptation cost in Northeast Asia

    Science.gov (United States)

    Park, J. H.; Lee, D. K.; Kim, H. G.; Sung, S.; Jung, T. Y.

    2015-12-01

    Various studies show that raising the temperature as well as storms, cold snap, raining and drought caused by climate change. And variety disasters have had a damage to mankind. The world risk report(2012, The Nature Conservancy) and UNU-EHS (the United Nations University Institute for Environment and Human Security) reported that more and more people are exposed to abnormal weather such as floods, drought, earthquakes, typhoons and hurricanes over the world. In particular, the case of Korea, we influenced by various pollutants which are occurred in Northeast Asian countries, China and Japan, due to geographical meteorological characteristics. These contaminants have had a significant impact on air quality with the pollutants generated in Korea. Recently, around the world continued their effort to reduce greenhouse gas and to improve air quality in conjunction with the national or regional development goals priority. China is also working on various efforts in accordance with the international flows to cope with climate change and air pollution. In the future, effect of climate change and air quality in Korea and Northeast Asia will be change greatly according to China's growth and mitigation policies. The purpose of this study is to minimize the damage caused by climate change on the Korean peninsula through an integrated approach taking into account the mitigation and adaptation plan. This study will suggest a climate change strategy at the national level by means of a comprehensive economic analysis of the impacts and mitigation of climate change. In order to quantify the impact and damage cost caused by climate change scenarios in a regional scale, it should be priority variables selected in accordance with impact assessment of climate change. The sectoral impact assessment was carried out on the basis of selected variables and through this, to derive the methodology how to estimate damage cost and adaptation cost. And then, the methodology was applied in Korea

  17. Cost-based droop scheme with lower generation costs for microgrids

    DEFF Research Database (Denmark)

    Nutkani, Inam Ullah; Loh, Poh Chiang; Blaabjerg, Frede

    2014-01-01

    -based droop scheme, whose objective is to reduce a generation cost function realised with various DG operating characteristics taken into consideration. Where desired, proportional power sharing based on the DG kVA ratings can also be included, whose disadvantage is a slightly higher generation cost, which...... on the DG kilovolts ampere (kVA) ratings. Other factors like generation costs, efficiencies and emission penalties at different load demands have not been considered. This omission might not be appropriate if different types of DGs are present in the microgrids. As an alternative, this study proposes a cost...... is still lower than that produced by the traditional droop schemes. The proposed droop scheme therefore retains all advantages of the traditional droop schemes, whereas at the same time, keeps its generation cost low. These findings have been validated in experiments....

  18. Establishing a cost model when estimating product cost in early design phases

    OpenAIRE

    Jeppsson, Johanna; Sjöberg, Jessica

    2017-01-01

    About 75% of the total product cost is determined in the early design phase, which means that the possibilities to affect costs are relatively small when the design phase is completed. For companies, it is therefore vital to conduct reliable cost estimates in the early design phase, when selecting between different design choices. When conducting a cost estimate there are many uncertainties. The aim with this study is therefore to explore how uncertainties regarding product cost can be consid...

  19. Hydrogen Station Cost Estimates: Comparing Hydrogen Station Cost Calculator Results with other Recent Estimates

    Energy Technology Data Exchange (ETDEWEB)

    Melaina, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Penev, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-09-01

    This report compares hydrogen station cost estimates conveyed by expert stakeholders through the Hydrogen Station Cost Calculation (HSCC) to a select number of other cost estimates. These other cost estimates include projections based upon cost models and costs associated with recently funded stations.

  20. Cost accounting in ECN

    International Nuclear Information System (INIS)

    Wout, E.L.; Bever Donker, J.M. van.

    1979-01-01

    A five year planning is made in which the available money is distributed to the expected programmes. This five year plan is used as basis for working plan and budget for the next year. In the working plan all financial means are divided into kinds of costs, cost centres and cost units. Based on this working plan and the relevant budgets the tariffs are calculated per working centre (cost centre). The tariffs are fixed for a whole year. Up till now these tariffs are also basis for the cost unit accounting at the end of the year together with the results of the time registration. The estimated work shop services for the working centres are included in the tariffs. For the allocation of overhead costs ECN uses dynamic keys. Depreciation costs with respect to instruments, investments etc. are determined per working centre according to a computer programme. The cost unit related costs are charged directly to cost unit. This implies that project related in instruments are looked upon as running costs. In the future we will try to refine the present cost accounting system still further in this way that we will look upon a cost centre as a profit centre. Furthermore we will try to analyse the tariff and calculation deviations and under/over occupation deviations afterwards (post calculation). The information provided to the management knows a hierachic construction: project information to projectleader, programme (compound projects) information to programme coordinator, cost centre summary to department heads, attention area (compound programme) information to programme coordinator and managing director, ECN research (compound attention areas) information to general management, information re kind of costs to relevant persons, f.e. surveys of expenditure for part time personnel to personnel bureau. The information is provided by the department of Finance and Administrative Organisation. The entire scope of cost accounting is the responsibility of the head of the department

  1. Tapping Transaction Costs to Forecast Acquisition Cost Breaches

    Science.gov (United States)

    2016-01-01

    experience a cost breach. In our medical example, we could use survival analysis to identify risk fac- tors, such as obesity , that might indicate a greater... exogenous variables on the probability of a dichotomous outcome, such as whether or not a cost breach occurs in any given program year. Logit is

  2. Karakteristik Es Krim Bengkuang Dengan Menggunakan Beberapa Jenis Susu

    Directory of Open Access Journals (Sweden)

    Failisnur Failisnur

    2013-06-01

    Full Text Available Ice cream is a frozen dairy solid product with the addition of other materials that are made through the process of freezing and agitation. The principle of its making to form a cavity of air in the mixture of ice cream ingredients to produce a volume that made the development of the ice cream into a lighter, less dense and has a soft texture. The purposed of the research to see influence the use of a variety of milk to the physical properties, chemical properties and organoleptic to the bengkoang ice cream produced. Research carried out by treatment type of milk used that were fullcream milk, sweetened condensed milk, soy milk powder, green bean powder, and soy milk liquid. The ice cream produced was tested the physics of overrun and melting speed, chemical analysis of protein content, fat and organoleptic of taste and texture. Research results showed that the best treatment was the use of soy milk powder where the value of overrun 37.2%, melting speed 10.1 minutes, protein content 6.9%, fat 13.08%, and organoleptic of  taste and texture was preferred.ABSTRAKEs krim merupakan produk olahan susu beku berbentuk padat dengan penambahan  bahan lain yang dibuat melalui proses pembekuan dan agitasi.  Prinsip pembuatan es krim adalah membentuk suatu rongga udara pada campuran bahan-bahan es krim sehingga dihasilkan pengembangan volume yang membuat es krim menjadi lebih ringan, tidak terlalu padat dan mempunyai tekstur yang lembut. Tujuan penelitian adalah untuk melihat pengaruh dari penggunaan beberapa jenis susu terhadap sifat fisik, kimia dan organoleptik es krim bengkuang yang dihasilkan.  Penelitian dilakukan dengan perlakuan  penggunaan susu fullcream, susu kental manis, susu kedelai bubuk, kacang hijau bubuk, dan susu kedelai cair.  Es krim yang dihasilkan dilakukan uji fisika overrun dan kecepatan meleleh, analisis kimia kadar protein, lemak dan uji organoleptik rasa dan tekstur. Hasil penelitan menunjukkan bahwa penggunaan susu kedelai

  3. Lifetime costs of cerebral palsy

    DEFF Research Database (Denmark)

    Kruse, Marie; Michelsen, Susan Ishøy; Flachs, Esben Meulengracht

    2009-01-01

    This study quantified the lifetime costs of cerebral palsy (CP) in a register-based setting. It was the first study outside the US to assess the lifetime costs of CP. The lifetime costs attributable to CP were divided into three categories: health care costs, productivity costs, and social costs....... social care costs and productivity costs associated with CP point to a potential gain from labour market interventions that benefit individuals with CP.......This study quantified the lifetime costs of cerebral palsy (CP) in a register-based setting. It was the first study outside the US to assess the lifetime costs of CP. The lifetime costs attributable to CP were divided into three categories: health care costs, productivity costs, and social costs...... in 2000. The prevalence of CP in eastern Denmark was approximately 1.7 per 1000. Information on productivity and the use of health care was retrieved from registers. The lifetime cost of CP was about euro860 000 for men and about euro800 000 for women. The largest component was social care costs...

  4. Oil and gas pipeline construction cost analysis and developing regression models for cost estimation

    Science.gov (United States)

    Thaduri, Ravi Kiran

    In this study, cost data for 180 pipelines and 136 compressor stations have been analyzed. On the basis of the distribution analysis, regression models have been developed. Material, Labor, ROW and miscellaneous costs make up the total cost of a pipeline construction. The pipelines are analyzed based on different pipeline lengths, diameter, location, pipeline volume and year of completion. In a pipeline construction, labor costs dominate the total costs with a share of about 40%. Multiple non-linear regression models are developed to estimate the component costs of pipelines for various cross-sectional areas, lengths and locations. The Compressor stations are analyzed based on the capacity, year of completion and location. Unlike the pipeline costs, material costs dominate the total costs in the construction of compressor station, with an average share of about 50.6%. Land costs have very little influence on the total costs. Similar regression models are developed to estimate the component costs of compressor station for various capacities and locations.

  5. Perceived risks of nuclear fuel waste disposal: trust, compensation, and public acceptance in Canada

    International Nuclear Information System (INIS)

    Hine, D.W.; Summers, C.

    1996-01-01

    AECL's recommendation to place the high-level radioactive waste in corrosion resistant containers and bury it in underground vaults several hundred metres deep in the rock of the Canadian shield is presently under federal review. If and when the disposal concept is approved by the federal review panel, a search will begin for a suitable host community. Given that siting guidelines prevent the government from unilaterally imposing the waste on a reluctant community, identifying a suitable site may represent the single greatest obstacle to successfully implementing the disposal concept. Even if the concept is approved by the review panel, it may be very difficult to find a community that is willing to accept the waste. In the US, efforts to site an underground disposal facility for high-level nuclear waste at Yucca Mountain has run into strong opposition from local residents and politicians, resulting in long delays and major cost overruns

  6. Ontario's energy policy : what are the new government's plans and how will they impact generation adequacy?

    International Nuclear Information System (INIS)

    Chuddy, B.

    2004-01-01

    Key market developments concerning the supply of electricity were identified in this paper, as well as details of legislation and commodity price changes. Major market issues such as volatile pricing, domestic supply shortfall and resource adequacy were examined. Factors contributing to current challenges were identified as being: limited generation investment; generation outages at time of system stress; volatile pricing to small consumers and price caps; lack of a conservation culture; and, cost overruns and growing debt. It was recommended that greater involvement of Local Distribution Companies (LDCs) in power procurement was desirable in order to address needs for stable default supplies as well as consolidation issues. Announcements of the Ontario Ministry of Energy were presented along with a series of questions posed by current market conditions. It was concluded that significant stakeholder input is desirable, as well as greater security in contracting entities, market structure and government resolve. tabs, figs

  7. Evaluation of Uniform Cost Accounting System to Fully Capture Depot Level Repair Costs.

    Science.gov (United States)

    1985-12-01

    RD-RI65 522 EVALUATION OF UNIFORM COST ACCOUNTING SYSTEM TO FULLY i/I CAPTURE DEPOT LEVEL REPAIR COSTS (U) NAVAL POSTGRADUATE SCHOOL MONTEREY CA D R...8217.LECTE B ,- THESIS EVALUATION OF UNIFORM COST ACCOUNTING SYSTEM 0TO FULLY CAPTURE DEPOT LEVEL REPAIR COSTS Jby __jDavid Richmond O’Brien lj,,, December...Include Security Classification) EVALUATION OF UNIFORM COST ACCOUNTING SYSTEM TO FULLY CAPTURE DEPOT LEVEL REPAIR COSTS 12 PERSONAL AUTHOR(S) O’Brien- David

  8. Cost Analysis of MRI Services in Iran: An Application of Activity Based Costing Technique

    International Nuclear Information System (INIS)

    Bayati, Mohsen; Mahboub Ahari, Alireza; Badakhshan, Abbas; Gholipour, Mahin; Joulaei, Hassan

    2015-01-01

    Considerable development of MRI technology in diagnostic imaging, high cost of MRI technology and controversial issues concerning official charges (tariffs) have been the main motivations to define and implement this study. The present study aimed to calculate the unit-cost of MRI services using activity-based costing (ABC) as a modern cost accounting system and to fairly compare calculated unit-costs with official charges (tariffs). We included both direct and indirect costs of MRI services delivered in fiscal year 2011 in Shiraz Shahid Faghihi hospital. Direct allocation method was used for distribution of overhead costs. We used micro-costing approach to calculate unit-cost of all different MRI services. Clinical cost data were retrieved from the hospital registering system. Straight-line method was used for depreciation cost estimation. To cope with uncertainty and to increase the robustness of study results, unit costs of 33 MRI services was calculated in terms of two scenarios. Total annual cost of MRI activity center (AC) was calculated at USD 400,746 and USD 532,104 based on first and second scenarios, respectively. Ten percent of the total cost was allocated from supportive departments. The annual variable costs of MRI center were calculated at USD 295,904. Capital costs measured at USD 104,842 and USD 236, 200 resulted from the first and second scenario, respectively. Existing tariffs for more than half of MRI services were above the calculated costs. As a public hospital, there are considerable limitations in both financial and administrative databases of Shahid Faghihi hospital. Labor cost has the greatest share of total annual cost of Shahid Faghihi hospital. The gap between unit costs and tariffs implies that the claim for extra budget from health providers may not be relevant for all services delivered by the studied MRI center. With some adjustments, ABC could be implemented in MRI centers. With the settlement of a reliable cost accounting system

  9. Cost Analysis of MRI Services in Iran: An Application of Activity Based Costing Technique.

    Science.gov (United States)

    Bayati, Mohsen; Mahboub Ahari, Alireza; Badakhshan, Abbas; Gholipour, Mahin; Joulaei, Hassan

    2015-10-01

    Considerable development of MRI technology in diagnostic imaging, high cost of MRI technology and controversial issues concerning official charges (tariffs) have been the main motivations to define and implement this study. The present study aimed to calculate the unit-cost of MRI services using activity-based costing (ABC) as a modern cost accounting system and to fairly compare calculated unit-costs with official charges (tariffs). We included both direct and indirect costs of MRI services delivered in fiscal year 2011 in Shiraz Shahid Faghihi hospital. Direct allocation method was used for distribution of overhead costs. We used micro-costing approach to calculate unit-cost of all different MRI services. Clinical cost data were retrieved from the hospital registering system. Straight-line method was used for depreciation cost estimation. To cope with uncertainty and to increase the robustness of study results, unit costs of 33 MRI services was calculated in terms of two scenarios. Total annual cost of MRI activity center (AC) was calculated at USD 400,746 and USD 532,104 based on first and second scenarios, respectively. Ten percent of the total cost was allocated from supportive departments. The annual variable costs of MRI center were calculated at USD 295,904. Capital costs measured at USD 104,842 and USD 236, 200 resulted from the first and second scenario, respectively. Existing tariffs for more than half of MRI services were above the calculated costs. As a public hospital, there are considerable limitations in both financial and administrative databases of Shahid Faghihi hospital. Labor cost has the greatest share of total annual cost of Shahid Faghihi hospital. The gap between unit costs and tariffs implies that the claim for extra budget from health providers may not be relevant for all services delivered by the studied MRI center. With some adjustments, ABC could be implemented in MRI centers. With the settlement of a reliable cost accounting system

  10. Total Cost of Ownership and Cost-to-Serve

    DEFF Research Database (Denmark)

    Zachariassen, Frederik

    2007-01-01

    Artiklen reviewer den eksisterende litteratur vedrørende økonomistyringsværktøjerne Total Cost of Ownership (TCO) og Cost-to-Serve (CtS). Herefter kortlægges det, hvordan TCO og CtS bidrager til en identificering af direkte omkostninger såvel som indirekte omkostninger henholdsvis up-stream og down...

  11. Impact of generic alendronate cost on the cost-effectiveness of osteoporosis screening and treatment.

    Directory of Open Access Journals (Sweden)

    Smita Nayak

    Full Text Available Since alendronate became available in generic form in the Unites States in 2008, its price has been decreasing. The objective of this study was to investigate the impact of alendronate cost on the cost-effectiveness of osteoporosis screening and treatment in postmenopausal women.Microsimulation cost-effectiveness model of osteoporosis screening and treatment for U.S. women age 65 and older. We assumed screening initiation at age 65 with central dual-energy x-ray absorptiometry (DXA, and alendronate treatment for individuals with osteoporosis; with a comparator of "no screening" and treatment only after fracture occurrence. We evaluated annual alendronate costs of $20 through $800; outcome measures included fractures; nursing home admission; medication adverse events; death; costs; quality-adjusted life-years (QALYs; and incremental cost-effectiveness ratios (ICERs in 2010 U.S. dollars per QALY gained. A lifetime time horizon was used, and direct costs were included. Base-case and sensitivity analyses were performed.Base-case analysis results showed that at annual alendronate costs of $200 or less, osteoporosis screening followed by treatment was cost-saving, resulting in lower total costs than no screening as well as more QALYs (10.6 additional quality-adjusted life-days. When assuming alendronate costs of $400 through $800, screening and treatment resulted in greater lifetime costs than no screening but was highly cost-effective, with ICERs ranging from $714 per QALY gained through $13,902 per QALY gained. Probabilistic sensitivity analyses revealed that the cost-effectiveness of osteoporosis screening followed by alendronate treatment was robust to joint input parameter estimate variation at a willingness-to-pay threshold of $50,000/QALY at all alendronate costs evaluated.Osteoporosis screening followed by alendronate treatment is effective and highly cost-effective for postmenopausal women across a range of alendronate costs, and may be cost

  12. The interplay between cost accounting knowledge and presentation formats in cost-based decision making

    NARCIS (Netherlands)

    Cardinaels, E.

    2008-01-01

    Most studies on cost-based decision-making examine the profit impact of cost reports that rely on different methods to allocate costs. In practice, firms’ cost reports often employ the same cost allocation method with subtle variations in the way that the cost data are presented. This paper examines

  13. Ventilation cost and air cleaning

    Science.gov (United States)

    Goodfellow, H. D.

    The components associated with the costs of the purchase of pollution control equipment are discussed. These include the capital cost to purchase the equipment and installation, and the costs incurred to operate the control device on an annual basis. Although the capital costs can represent a significant outlay of money, typically these costs are spread out over the life of the equipment. In general, this amortized cost is combined with the operating cost and is referred to as an 'annualized cost'. The annualized cost is a commonly used indicator to demonstrate the actual year to year cost that the equipment and operation will represent. Values and methods used to estimate costs, typical cost indicators, and sources of computerized costing models are presented. A comparison of the capital cost expenditure required for a model case (a cement kiln operation), using three control device alternatives is made.

  14. Calculations for accidents in water reactors during operation at power

    International Nuclear Information System (INIS)

    Blanc, H.; Dutraive, P.; Fabrega, S.; Millot, J.P.

    1976-07-01

    The behaviour of a water reactor on an accident occurring as the reactor is normally operated at power may be calculated through the computer code detailed in this article. Reactivity accidents, loss of coolant ones and power over-running ones are reviewed. (author)

  15. The electret detector for ionizing radiations: no energy consumption in watching state

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    This very simple and cheap detector measures doses absorbed by the user who can control it at any time. Its main advantage is the capability of acting an alarm signal or any other security device when the maximum permissible dose is overrun [fr

  16. The Joint Program Dilemma: Analyzing the Pervasive Role that Social Dilemmas Play in Undermining Acquisition Success

    Science.gov (United States)

    2013-04-01

    acquisition programs may substantially exceed budget, overrun schedule, deliver inadequate quality, and ultimately even fail ( Frangos , 1998; Madachy, 2008...Society. Fehr, E., & Gachter, S. (2002, January). Altruistic punishment in humans. Nature, 415, 137–140. Frangos , S. A. (1998). Motivated humans for

  17. Cost-based droop scheme with lower generation costs for microgrids

    DEFF Research Database (Denmark)

    Nutkani, I. U.; Loh, Poh Chiang; Blaabjerg, Frede

    2013-01-01

    on the DG kVA ratings. Other operating characteristics like generation costs, efficiencies and emission penalties at different loadings have not been considered. This makes existing droop schemes not too well-suited for standalone microgrids without central management system, where different types of DGs...... usually exist. As an alternative, this paper proposes a cost-based droop scheme, whose objective is to reduce a generation cost realized with various DG operating characteristics taken into consideration. The proposed droop scheme therefore retains all advantages of the traditional droop schemes, while...... at the same time keep its generation cost low. These findings have been validated through simulation and scaled down lab experiment....

  18. An Analysis Of Activity Based Costing Between Benefit And Cost For Its Implementation

    Directory of Open Access Journals (Sweden)

    Dadan Soekardan

    2015-08-01

    Full Text Available This research discusses how the importance of adopting activity-based costing for the company in order to carry out its business strategy. One objective is to implement activity based costing cost efficiency by cutting costs incurred for non-value added activity. But the phenomenon shows that there are still many companies organizations are not interested in adopting the activity based costing. This article also outlines the advantages and limitations in adopting activity based costing for the company.

  19. Waste management facilities cost information: System cost model product description. Revision 2

    International Nuclear Information System (INIS)

    Lundeen, A.S.; Hsu, K.M.; Shropshire, D.E.

    1996-02-01

    In May of 1994, Lockheed Idaho Technologies Company (LITCO) in Idaho Falls, Idaho and subcontractors developed the System Cost Model (SCM) application. The SCM estimates life-cycle costs of the entire US Department of Energy (DOE) complex for designing; constructing; operating; and decommissioning treatment, storage, and disposal (TSD) facilities for mixed low-level, low-level, transuranic, and mixed transuranic waste. The SCM uses parametric cost functions to estimate life-cycle costs for various treatment, storage, and disposal modules which reflect planned and existing facilities at DOE installations. In addition, SCM can model new facilities based on capacity needs over the program life cycle. The SCM also provides transportation costs for DOE wastes. Transportation costs are provided for truck and rail and include transport of contact-handled, remote-handled, and alpha (transuranic) wastes. The user can provide input data (default data is included in the SCM) including the volume and nature of waste to be managed, the time period over which the waste is to be managed, and the configuration of the waste management complex (i.e., where each installation's generated waste will be treated, stored, and disposed). Then the SCM uses parametric cost equations to estimate the costs of pre-operations (designing), construction costs, operation management, and decommissioning these waste management facilities

  20. ICPP tank farm closure study. Volume III: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    International Nuclear Information System (INIS)

    1998-02-01

    This volume contains information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the six options described in Volume 1, Section 2: Option 1 -- Total removal clean closure; No subsequent use; Option 2 -- Risk-based clean closure; LLW fill; Option 3 -- Risk-based clean closure; CERCLA fill; Option 4 -- Close to RCRA landfill standards; LLW fill; Option 5 -- Close to RCRA landfill standards; CERCLA fill; and Option 6 -- Close to RCRA landfill standards; Clean fill. This volume is divided into two portions. The first portion contains the cost and planning schedule estimates while the second portion contains life-cycle costs and yearly cash flow information for each option

  1. Costs and cost-effectiveness of delivering intermittent preventive treatment through schools in western Kenya

    Directory of Open Access Journals (Sweden)

    Jukes Matthew CH

    2008-09-01

    Full Text Available Abstract Background Awareness of the potential impact of malaria among school-age children has stimulated investigation into malaria interventions that can be delivered through schools. However, little evidence is available on the costs and cost-effectiveness of intervention options. This paper evaluates the costs and cost-effectiveness of intermittent preventive treatment (IPT as delivered by teachers in schools in western Kenya. Methods Information on actual drug and non-drug associated costs were collected from expenditure and salary records, government budgets and interviews with key district and national officials. Effectiveness data were derived from a cluster-randomised-controlled trial of IPT where a single dose of sulphadoxine-pyrimethamine and three daily doses of amodiaquine were provided three times in year (once termly. Both financial and economic costs were estimated from a provider perspective, and effectiveness was estimated in terms of anaemia cases averted. A sensitivity analysis was conducted to assess the impact of key assumptions on estimated cost-effectiveness. Results The delivery of IPT by teachers was estimated to cost US$ 1.88 per child treated per year, with drug and teacher training costs constituting the largest cost components. Set-up costs accounted for 13.2% of overall costs (equivalent to US$ 0.25 per child whilst recurrent costs accounted for 86.8% (US$ 1.63 per child per year. The estimated cost per anaemia case averted was US$ 29.84 and the cost per case of Plasmodium falciparum parasitaemia averted was US$ 5.36, respectively. The cost per case of anaemia averted ranged between US$ 24.60 and 40.32 when the prices of antimalarial drugs and delivery costs were varied. Cost-effectiveness was most influenced by effectiveness of IPT and the background prevalence of anaemia. In settings where 30% and 50% of schoolchildren were anaemic, cost-effectiveness ratios were US$ 12.53 and 7.52, respectively. Conclusion This

  2. A new costing model in hospital management: time-driven activity-based costing system.

    Science.gov (United States)

    Öker, Figen; Özyapıcı, Hasan

    2013-01-01

    Traditional cost systems cause cost distortions because they cannot meet the requirements of today's businesses. Therefore, a new and more effective cost system is needed. Consequently, time-driven activity-based costing system has emerged. The unit cost of supplying capacity and the time needed to perform an activity are the only 2 factors considered by the system. Furthermore, this system determines unused capacity by considering practical capacity. The purpose of this article is to emphasize the efficiency of the time-driven activity-based costing system and to display how it can be applied in a health care institution. A case study was conducted in a private hospital in Cyprus. Interviews and direct observations were used to collect the data. The case study revealed that the cost of unused capacity is allocated to both open and laparoscopic (closed) surgeries. Thus, by using the time-driven activity-based costing system, managers should eliminate the cost of unused capacity so as to obtain better results. Based on the results of the study, hospital management is better able to understand the costs of different surgeries. In addition, managers can easily notice the cost of unused capacity and decide how many employees to be dismissed or directed to other productive areas.

  3. The Significance of Coordination for Industrialised Building System (IBS Precast Concrete in Construction Industry

    Directory of Open Access Journals (Sweden)

    Fitri Othman Mohd Khairul

    2017-01-01

    Full Text Available IBS precast concrete is construction system which is meant to improve the conventional construction process. However IBS precast concrete projects are suffering from serious problems such as cost overrun, delays and less quality of the end product. The absence of coordination is perceived as the reason for this issue. The purpose of this paper is to review the significance of coordination for IBS precast concrete in the construction industry. It if found that the fragmentation which occurs in the construction industry requires continuity of coordination due to the construction activities are intertwined in nature. Coordination is designated to assist stakeholders in completing and complementing each other with the paramount focus of achieving the objective. Proper coordination is required in delivering the desired construction product at the ideal time, cost and quality. As for the findings, the significance of coordination for IBS precast concrete can be seen through the precast concrete construction phases which consist of planning; design; manufacturing; transportation and installation/construction. These phases are meant to complement construction process with the purpose to reduce issues of fragmentation and enhance IBS precast concrete project delivery.

  4. Thinking big: Politics, progress, and security in the management of Asian and European energy megaprojects

    International Nuclear Information System (INIS)

    Van de Graaf, Thijs; Sovacool, Benjamin K.

    2014-01-01

    This article examines four energy megaprojects, two in Europe and two in Asia. For each region, a large natural gas pipeline project and an international project involving solar power from the desert is studied. The natural gas projects are: the Nabucco project (in Europe) and the trans-ASEAN gas pipeline network (in Asia). The solar power from the desert projects are: Desertec (in Europe) and Gobitec (in Asia). The article probes explanations of megaproject failure along social, technical, economic, political, and psychological dimensions. We find that these projects, though they are very different in nature and pertain to different regions, all suffer from a similar set of problems: too many stakeholders and stakeholder fragmentation; cost overruns and the risk of accidents and attacks; massive externalization of costs to third party stakeholders; concentration of wealth and corruption; and inflated expectations and biased projections. We conclude by reflecting on lessons for not only the involved institutions and investors, but energy analysts and the public at large. - Highlights: • Four energy megaprojects are analyzed: Nabucco, TAGP, Gobitec and Desertec. • Despite their differences, all suffer from a similar set of problems. • They exhibit social, technical, economic, political, and psychological failures

  5. Why activity based costing (ABC) is still tagging behind the traditional costing in Malaysia?

    OpenAIRE

    Rasiah, Devinaga

    2011-01-01

    This study compares activity-based costing (ABC) model and traditional costing method in Malaysia. Activity based costing (ABC) which was developed into the manufacturing/service sectors in Malaysia. It calculates the cost and performance of activities, resources and cost objects. It can be considered as an alternative model to Traditional Cost-based accounting systems. In this study the results indicated that most operations managers believed that their present cost systems were adequate for...

  6. Logistics costs of the enterprise

    Directory of Open Access Journals (Sweden)

    Andrea Rosová

    2007-06-01

    Full Text Available The article describe a problem of specification and systematization of enterprise’s logistics costs. With in a growing division of labour, also logistics costs increase their part in enterprises total costs.Almost all decisions about products and production in general, influence logistics processes even logistics costs and performances.In present is not clear enough, which of the cost-particles are relevant fot logistics costs, because some of logistics cost-particles accounts within overhead are charged together with costs of other sorts.Substantive step in the process of the monitoring and evidence of logistics costs is definition of this, that costs of enterprise´s processes will be inclusive in logistics costs and determining points of contact with the others departments (acquisition, production, sale etc.. After the specification of meditation processes, there is a need to choose applicable parameters for the expression of logistics performances. Besides logistics costs is needed to know logistics performances equivalent herewith at a cost of, therefore from the control side have for enterprise bigger value indices expressive correlation costs and performances(e.g. share of logistics unit costs performance.At the proposal and evidence of logistics costs and performances is needed consistently entertain an individual conditions of enterprise. Because the area of processes included strongly affects the size of account logistics costs and its share part in total costs of enterprise. Logistics costs are flow line between economy and logistics of the enterprise.

  7. Filmless versus film-based systems in radiographic examination costs: an activity-based costing method

    Directory of Open Access Journals (Sweden)

    Sase Yuji

    2011-09-01

    Full Text Available Abstract Background Since the shift from a radiographic film-based system to that of a filmless system, the change in radiographic examination costs and costs structure have been undetermined. The activity-based costing (ABC method measures the cost and performance of activities, resources, and cost objects. The purpose of this study is to identify the cost structure of a radiographic examination comparing a filmless system to that of a film-based system using the ABC method. Methods We calculated the costs of radiographic examinations for both a filmless and a film-based system, and assessed the costs or cost components by simulating radiographic examinations in a health clinic. The cost objects of the radiographic examinations included lumbar (six views, knee (three views, wrist (two views, and other. Indirect costs were allocated to cost objects using the ABC method. Results The costs of a radiographic examination using a filmless system are as follows: lumbar 2,085 yen; knee 1,599 yen; wrist 1,165 yen; and other 1,641 yen. The costs for a film-based system are: lumbar 3,407 yen; knee 2,257 yen; wrist 1,602 yen; and other 2,521 yen. The primary activities were "calling patient," "explanation of scan," "take photographs," and "aftercare" for both filmless and film-based systems. The cost of these activities cost represented 36.0% of the total cost for a filmless system and 23.6% of a film-based system. Conclusions The costs of radiographic examinations using a filmless system and a film-based system were calculated using the ABC method. Our results provide clear evidence that the filmless system is more effective than the film-based system in providing greater value services directly to patients.

  8. Filmless versus film-based systems in radiographic examination costs: an activity-based costing method.

    Science.gov (United States)

    Muto, Hiroshi; Tani, Yuji; Suzuki, Shigemasa; Yokooka, Yuki; Abe, Tamotsu; Sase, Yuji; Terashita, Takayoshi; Ogasawara, Katsuhiko

    2011-09-30

    Since the shift from a radiographic film-based system to that of a filmless system, the change in radiographic examination costs and costs structure have been undetermined. The activity-based costing (ABC) method measures the cost and performance of activities, resources, and cost objects. The purpose of this study is to identify the cost structure of a radiographic examination comparing a filmless system to that of a film-based system using the ABC method. We calculated the costs of radiographic examinations for both a filmless and a film-based system, and assessed the costs or cost components by simulating radiographic examinations in a health clinic. The cost objects of the radiographic examinations included lumbar (six views), knee (three views), wrist (two views), and other. Indirect costs were allocated to cost objects using the ABC method. The costs of a radiographic examination using a filmless system are as follows: lumbar 2,085 yen; knee 1,599 yen; wrist 1,165 yen; and other 1,641 yen. The costs for a film-based system are: lumbar 3,407 yen; knee 2,257 yen; wrist 1,602 yen; and other 2,521 yen. The primary activities were "calling patient," "explanation of scan," "take photographs," and "aftercare" for both filmless and film-based systems. The cost of these activities cost represented 36.0% of the total cost for a filmless system and 23.6% of a film-based system. The costs of radiographic examinations using a filmless system and a film-based system were calculated using the ABC method. Our results provide clear evidence that the filmless system is more effective than the film-based system in providing greater value services directly to patients.

  9. Designer's unified cost model

    Science.gov (United States)

    Freeman, William T.; Ilcewicz, L. B.; Swanson, G. D.; Gutowski, T.

    1992-01-01

    A conceptual and preliminary designers' cost prediction model has been initiated. The model will provide a technically sound method for evaluating the relative cost of different composite structural designs, fabrication processes, and assembly methods that can be compared to equivalent metallic parts or assemblies. The feasibility of developing cost prediction software in a modular form for interfacing with state of the art preliminary design tools and computer aided design programs is being evaluated. The goal of this task is to establish theoretical cost functions that relate geometric design features to summed material cost and labor content in terms of process mechanics and physics. The output of the designers' present analytical tools will be input for the designers' cost prediction model to provide the designer with a data base and deterministic cost methodology that allows one to trade and synthesize designs with both cost and weight as objective functions for optimization. The approach, goals, plans, and progress is presented for development of COSTADE (Cost Optimization Software for Transport Aircraft Design Evaluation).

  10. Lives Saved Tool (LiST) costing: a module to examine costs and prioritize interventions.

    Science.gov (United States)

    Bollinger, Lori A; Sanders, Rachel; Winfrey, William; Adesina, Adebiyi

    2017-11-07

    Achieving the Sustainable Development Goals will require careful allocation of resources in order to achieve the highest impact. The Lives Saved Tool (LiST) has been used widely to calculate the impact of maternal, neonatal and child health (MNCH) interventions for program planning and multi-country estimation in several Lancet Series commissions. As use of the LiST model increases, many have expressed a desire to cost interventions within the model, in order to support budgeting and prioritization of interventions by countries. A limited LiST costing module was introduced several years ago, but with gaps in cost types. Updates to inputs have now been added to make the module fully functional for a range of uses. This paper builds on previous work that developed an initial version of the LiST costing module to provide costs for MNCH interventions using an ingredients-based costing approach. Here, we update in 2016 the previous econometric estimates from 2013 with newly-available data and also include above-facility level costs such as program management. The updated econometric estimates inform percentages of intervention-level costs for some direct costs and indirect costs. These estimates add to existing values for direct cost requirements for items such as drugs and supplies and required provider time which were already available in LiST Costing. Results generated by the LiST costing module include costs for each intervention, as well as disaggregated costs by intervention including drug and supply costs, labor costs, other recurrent costs, capital costs, and above-service delivery costs. These results can be combined with mortality estimates to support prioritization of interventions by countries. The LiST costing module provides an option for countries to identify resource requirements for scaling up a maternal, neonatal, and child health program, and to examine the financial impact of different resource allocation strategies. It can be a useful tool for

  11. Lives Saved Tool (LiST costing: a module to examine costs and prioritize interventions

    Directory of Open Access Journals (Sweden)

    Lori A. Bollinger

    2017-11-01

    Full Text Available Abstract Background Achieving the Sustainable Development Goals will require careful allocation of resources in order to achieve the highest impact. The Lives Saved Tool (LiST has been used widely to calculate the impact of maternal, neonatal and child health (MNCH interventions for program planning and multi-country estimation in several Lancet Series commissions. As use of the LiST model increases, many have expressed a desire to cost interventions within the model, in order to support budgeting and prioritization of interventions by countries. A limited LiST costing module was introduced several years ago, but with gaps in cost types. Updates to inputs have now been added to make the module fully functional for a range of uses. Methods This paper builds on previous work that developed an initial version of the LiST costing module to provide costs for MNCH interventions using an ingredients-based costing approach. Here, we update in 2016 the previous econometric estimates from 2013 with newly-available data and also include above-facility level costs such as program management. The updated econometric estimates inform percentages of intervention-level costs for some direct costs and indirect costs. These estimates add to existing values for direct cost requirements for items such as drugs and supplies and required provider time which were already available in LiST Costing. Results Results generated by the LiST costing module include costs for each intervention, as well as disaggregated costs by intervention including drug and supply costs, labor costs, other recurrent costs, capital costs, and above-service delivery costs. These results can be combined with mortality estimates to support prioritization of interventions by countries. Conclusions The LiST costing module provides an option for countries to identify resource requirements for scaling up a maternal, neonatal, and child health program, and to examine the financial impact of different

  12. Bayesian models for cost-effectiveness analysis in the presence of structural zero costs.

    Science.gov (United States)

    Baio, Gianluca

    2014-05-20

    Bayesian modelling for cost-effectiveness data has received much attention in both the health economics and the statistical literature, in recent years. Cost-effectiveness data are characterised by a relatively complex structure of relationships linking a suitable measure of clinical benefit (e.g. quality-adjusted life years) and the associated costs. Simplifying assumptions, such as (bivariate) normality of the underlying distributions, are usually not granted, particularly for the cost variable, which is characterised by markedly skewed distributions. In addition, individual-level data sets are often characterised by the presence of structural zeros in the cost variable. Hurdle models can be used to account for the presence of excess zeros in a distribution and have been applied in the context of cost data. We extend their application to cost-effectiveness data, defining a full Bayesian specification, which consists of a model for the individual probability of null costs, a marginal model for the costs and a conditional model for the measure of effectiveness (given the observed costs). We presented the model using a working example to describe its main features. © 2013 The Authors. Statistics in Medicine published by John Wiley & Sons, Ltd.

  13. Rehabilitation costs

    Energy Technology Data Exchange (ETDEWEB)

    Kubo, Arthur S [BDM Corp., VA (United States); [Bikini Atoll Rehabilitation Committee, Berkeley, CA (United States)

    1986-07-01

    The costs of radioactivity contamination control and other matters relating to the resettlement of Bikin atoll were reviewed for Bikini Atoll Rehabilitation Committee by a panel of engineers which met in Berkeley, California on January 22-24, 1986. This Appendix presents the cost estimates.

  14. Rehabilitation costs

    International Nuclear Information System (INIS)

    Kubo, Arthur S.

    1986-01-01

    The costs of radioactivity contamination control and other matters relating to the resettlement of Bikin atoll were reviewed for Bikini Atoll Rehabilitation Committee by a panel of engineers which met in Berkeley, California on January 22-24, 1986. This Appendix presents the cost estimates

  15. Information Technology Budgets and Costs: Do You Know What Your Information Technology Costs Each Year?

    Science.gov (United States)

    Dugan, Robert E.

    2002-01-01

    Discusses yearly information technology costs for academic libraries. Topics include transformation and modernization activities that affect prices and budgeting; a cost model for information technologies; life cycle costs, including initial costs and recurring costs; cost benchmarks; and examples of pressures concerning cost accountability. (LRW)

  16. Lifetime costs of lung transplantation : Estimation of incremental costs

    NARCIS (Netherlands)

    VanEnckevort, PJ; Koopmanschap, MA; Tenvergert, EM; VanderBij, W; Rutten, FFH

    1997-01-01

    Despite an expanding number of centres which provide lung transplantation, information about the incremental costs of lung transplantation is scarce. From 1991 until 1995, in The Netherlands a technology assessment was performed which provided information about the incremental costs of lung

  17. COST QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Vitanova Gordana

    2009-05-01

    Full Text Available Within the contemporary economic conditions, enterprises might achieve a competitive advantage if only they sell goods and services with high quality and lower prices. Customers, usually, prefer quality goods with acceptable prices, while such goods create reputation with the particular brand. The perfect control system is necessary to achieve a high quality product, which the cost quality management is considered to be an indispensable part in. The cost quality is nevertheless created to ensure that customers’ requirements are being appropriately attained. The most important objective of quality costs controlling is to assist the management in enhancing the product’s value permanently. The superior cost quality control system helps the management to achieve other strategic objectives, such as: producing goods with acceptable costs and deliver the products to their customers in time.

  18. Cost function estimation

    DEFF Research Database (Denmark)

    Andersen, C K; Andersen, K; Kragh-Sørensen, P

    2000-01-01

    on these criteria, a two-part model was chosen. In this model, the probability of incurring any costs was estimated using a logistic regression, while the level of the costs was estimated in the second part of the model. The choice of model had a substantial impact on the predicted health care costs, e...

  19. Determining the economic cost of ICU treatment: a prospective "micro-costing" study.

    LENUS (Irish Health Repository)

    McLaughlin, Anne Marie

    2009-12-01

    To prospectively assess the cost of patients in an adult intensive care unit (ICU) using bottom-up costing methodology and evaluate the usefulness of "severity of illness" scores in estimating ICU cost.

  20. Cost accounting at GKSS

    International Nuclear Information System (INIS)

    Hinz, R.

    1979-01-01

    The GKSS has a cost accounting system comprising cost type, cost centre and cost unit accounting which permits of a comprehensive and detailed supervision of the accural of costs and use of funds, makes price setting for outside orders possible and provides the necessary data for decision-making and planning. It fulfills the requirement for an ordered accounting system; it is therefore guaranteed that there exists between financial accounts department and cost accounting a proper demarcation and transition, that costs are accounted fully only on the basis of vouchers and only once, evaluation and distribution are unified and the principle of causation is observed. Two employees are engaged in costs and services accounting. Although we strive to effect adaptations as swiftly as possible, and constantly to adapt refinements and supplementary processes for the improvement of the system, this can only occur within the scope of, and with the exactitude necessary for the required information. (author)

  1. nuSTORM Costing document

    Energy Technology Data Exchange (ETDEWEB)

    Bross, Alan D. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)

    2013-10-01

    Detailed costing of the nuSTORM conventional facilities has been done by the Fermilab Facilities Engineering Services Section (FESS) and is reported on in the nuSTORM Project Definition Report (PDR) 6-13-1. Estimates for outfitting the primary proton beam line, the target station, the pion capture/transport line and decay ring are based on either experience from existing Fermilab infrastructure (NuMI) or is based on the detailed costing exercises for DOE CD-1 approval for future experiments (mu2e and LBNE). The detector costing utilized the Euronu costing for the Neutrino Factory Magnetized Iron Neutrino Detector (MIND), extrapolations from MINOS as-built costs and from recent vendor quotes. Costs included all manpower and are fully burdened (FY2013 dollars). The costs are not escalated, however, beyond the 5-year project timeline, since a project start for nuSTORM is unknown. Escalation can be estimated from various models (see Figure 1). LBNE has used the Jacob’s model to determine their cost escalation.

  2. Costs of groundwater contamination

    International Nuclear Information System (INIS)

    O'Neil, W.B.; Raucher, R.S.

    1990-01-01

    Two factors determine the cost of groundwater contamination: (1) the ways in which water was being used or was expected to be used in the future and (2) the physical characteristics of the setting that constrain the responses available to regain lost uses or to prevent related damages to human health and the environment. Most contamination incidents can be managed at a low enough cost that uses will not be foreclosed. It is important to take into account the following when considering costs: (1) natural cleansing through recharge and dilution can take many years; (2) it is difficult and costly to identify the exact area and expected path of a contamination plume; and (3) treatment or replacement of contaminated water often may represent the cost-effective strategy for managing the event. The costs of contamination include adverse health effects, containment and remediation, treatment and replacement costs. In comparing the costs and benefits of prevention programs with those of remediation, replacement or treatment, it is essential to adjust the cost/benefit numbers by the probability of their actual occurrence. Better forecasts of water demand are needed to predict more accurately the scarcity of new supply and the associated cost of replacement. This research should include estimates of the price elasticity of water demand and the possible effect on demand of more rational cost-based pricing structures. Research and development of techniques for in situ remediation should be encouraged

  3. Cost considerations

    NARCIS (Netherlands)

    Michiel Ras; Debbie Verbeek-Oudijk; Evelien Eggink

    2013-01-01

    Original title: Lasten onder de loep The Dutch government spends almost 7 billion euros  each year on care for people with intellectual disabilities, and these costs are rising steadily. This report analyses what underlies the increase in costs that occurred between 2007 and 2011. Was

  4. The cost of Alzheimer's disease in China and re-estimation of costs worldwide.

    Science.gov (United States)

    Jia, Jianping; Wei, Cuibai; Chen, Shuoqi; Li, Fangyu; Tang, Yi; Qin, Wei; Zhao, Lina; Jin, Hongmei; Xu, Hui; Wang, Fen; Zhou, Aihong; Zuo, Xiumei; Wu, Liyong; Han, Ying; Han, Yue; Huang, Liyuan; Wang, Qi; Li, Dan; Chu, Changbiao; Shi, Lu; Gong, Min; Du, Yifeng; Zhang, Jiewen; Zhang, Junjian; Zhou, Chunkui; Lv, Jihui; Lv, Yang; Xie, Haiqun; Ji, Yong; Li, Fang; Yu, Enyan; Luo, Benyan; Wang, Yanjiang; Yang, Shanshan; Qu, Qiumin; Guo, Qihao; Liang, Furu; Zhang, Jintao; Tan, Lan; Shen, Lu; Zhang, Kunnan; Zhang, Jinbiao; Peng, Dantao; Tang, Muni; Lv, Peiyuan; Fang, Boyan; Chu, Lan; Jia, Longfei; Gauthier, Serge

    2018-04-01

    The socioeconomic costs of Alzheimer's disease (AD) in China and its impact on global economic burden remain uncertain. We collected data from 3098 patients with AD in 81 representative centers across China and estimated AD costs for individual patient and total patients in China in 2015. Based on this data, we re-estimated the worldwide costs of AD. The annual socioeconomic cost per patient was US $19,144.36, and total costs were US $167.74 billion in 2015. The annual total costs are predicted to reach US $507.49 billion in 2030 and US $1.89 trillion in 2050. Based on our results, the global estimates of costs for dementia were US $957.56 billion in 2015, and will be US $2.54 trillion in 2030, and US $9.12 trillion in 2050, much more than the predictions by the World Alzheimer Report 2015. China bears a heavy burden of AD costs, which greatly change the estimates of AD cost worldwide. Copyright © 2017 the Alzheimer's Association. Published by Elsevier Inc. All rights reserved.

  5. SUPPLIES COSTS: AN EXPLORATORY STUDY WITH APPLICATION OF MEASUREMENT MODEL OF LOGISTICS COSTS

    Directory of Open Access Journals (Sweden)

    Ana Paula Ferreira Alves

    2013-12-01

    Full Text Available One of the main reasons for the difficulty in adopting an integrated method of calculation of logistics costs is still a lack of adequate information about costs. The management of the supply chain and identify its costs can provide information for their managers, with regard to decision making, generating competitive advantage. Some models of calculating logistics costs are proposed by Uelze (1974, Dias (1996, Goldratt (2002, Christopher (2007, Castiglioni (2009 and Borba & Gibbon (2009, with little disclosure of the results. In this context, this study aims to evaluate the costs of supplies, applying a measurement model of logistics costs. Methodologically, the study characterized as exploratory. The model applied pointed, in original condition, that about R$ 2.5 million were being applied in the process of management of supplies, with replacement costs and storage imbalance. Upgrading the company's data, it is possible obtain a 52% reduction in costs to replace and store supplies. Thus, the cost model applied to logistical supplies showed feasibility of implementation, as well as providing information to assist in management and decision-making in logistics supply.

  6. Implementation of a Cost-Accounting System for Visibility of Weapon Systems Life-Cycle Costs

    National Research Council Canada - National Science Library

    Ugone, Mary

    2001-01-01

    ... costs through activity-based costing and management. The system must deliver timely, integrated data for management purposes to permit understanding of total weapon costs, provide a basis for estimating costs of future systems, and feed other tools for life-cycle cost management.

  7. Costs, health effects and cost-effectiveness of alcohol and tobacco control strategies in Estonia.

    NARCIS (Netherlands)

    Lai, T.; Habicht, J.; Reinap, M.; Chisholm, D.; Baltussen, R.M.P.M.

    2007-01-01

    OBJECTIVE: To assess the population-level costs, effects and cost-effectiveness of different alcohol and tobacco control strategies in Estonia. DESIGN: A WHO cost-effectiveness modelling framework was used to estimate the total costs and effects of interventions. Costs were assessed in Estonian

  8. Stochastic cost estimating in repository life-cycle cost analysis

    International Nuclear Information System (INIS)

    Tzemos, S.; Dippold, D.

    1986-01-01

    The conceptual development, the design, and the final construction and operation of a nuclear repository span many decades. Given this lengthy time frame, it is quite challenging to obtain a good approximation of the repository life-cycle cost. One can deal with this challenge by using an analytic method, the method of moments, to explicitly assess the uncertainty of the estimate. A series expansion is used to approximate the uncertainty distribution of the cost estimate. In this paper, the moment methodology is derived and is illustrated through a numerical example. The range of validity of the approximation is discussed. The method of moments is compared to the traditional stochastic cost estimating methods and found to provide more and better information on cost uncertainty. The tow methods converge to identical results as the number of convolved variables increases and approaches the range where the central limit theorem is valid

  9. Cost Benefit Analysis: Cost Benefit Analysis for Human Effectiveness Research: Bioacoustic Protection

    Science.gov (United States)

    2001-07-21

    APPENDIX A. ACRONYMS ACCES Attenuating Custom Communication Earpiece System ACEIT Automated Cost estimating Integrated Tools AFSC Air Force...documented in the ACEIT cost estimating tool developed by Tecolote, Inc. The factor used was 14 percent of PMP. 1.3 System Engineering/ Program...The data source is the ASC Aeronautical Engineering Products Cost Factor Handbook which is documented in the ACEIT cost estimating tool developed

  10. Rethinking sunk costs

    International Nuclear Information System (INIS)

    Capen, E.C.

    1991-01-01

    As typically practiced in the petroleum/ natural gas industry, most economic calculations leave out sunk costs. Integrated businesses can be hurt by the omission of sunk costs because profits and costs are not allocated properly among the various business segments. Not only can the traditional sunk-cost practice lead to predictably bad decisions, but a company that operates under such a policy will have no idea how to allocate resources among its operating components; almost none of its calculated returns will be correct. This paper reports that the solution is to include asset value as part of the investment in the calculation

  11. Designers' unified cost model

    Science.gov (United States)

    Freeman, W.; Ilcewicz, L.; Swanson, G.; Gutowski, T.

    1992-01-01

    The Structures Technology Program Office (STPO) at NASA LaRC has initiated development of a conceptual and preliminary designers' cost prediction model. The model will provide a technically sound method for evaluating the relative cost of different composite structural designs, fabrication processes, and assembly methods that can be compared to equivalent metallic parts or assemblies. The feasibility of developing cost prediction software in a modular form for interfacing with state-of-the-art preliminary design tools and computer aided design programs is being evaluated. The goal of this task is to establish theoretical cost functions that relate geometric design features to summed material cost and labor content in terms of process mechanics and physics. The output of the designers' present analytical tools will be input for the designers' cost prediction model to provide the designer with a database and deterministic cost methodology that allows one to trade and synthesize designs with both cost and weight as objective functions for optimization. This paper presents the team members, approach, goals, plans, and progress to date for development of COSTADE (Cost Optimization Software for Transport Aircraft Design Evaluation).

  12. Cost-of-illness studies.

    Science.gov (United States)

    Oderda, Gary M

    2003-01-01

    Cost-of-illness studies measure the overall economic impact of a disease on society. Such studies are important in setting public health priorities and for economic evaluation of new treatments. These studies should take the societal perspective and include both direct and indirect costs. Often indirect costs exceed direct costs. Comparison of cost-of-illness studies from different countries is difficult because of differences in population, currency, the way health care is provided, and other social and political factors.

  13. Cost estimating for CERCLA remedial alternatives a unit cost methodology

    International Nuclear Information System (INIS)

    Brettin, R.W.; Carr, D.J.; Janke, R.J.

    1995-06-01

    The United States Environmental Protection Agency (EPA) Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA, Interim Final, dated October 1988 (EPA 1988) requires a detailed analysis be conducted of the most promising remedial alternatives against several evaluation criteria, including cost. To complete the detailed analysis, order-of-magnitude cost estimates (having an accuracy of +50 percent to -30 percent) must be developed for each remedial alternative. This paper presents a methodology for developing cost estimates of remedial alternatives comprised of various technology and process options with a wide range of estimated contaminated media quantities. In addition, the cost estimating methodology provides flexibility for incorporating revisions to remedial alternatives and achieves the desired range of accuracy. It is important to note that the cost estimating methodology presented here was developed as a concurrent path to the development of contaminated media quantity estimates. This methodology can be initiated before contaminated media quantities are estimated. As a result, this methodology is useful in developing cost estimates for use in screening and evaluating remedial technologies and process options. However, remedial alternative cost estimates cannot be prepared without the contaminated media quantity estimates. In the conduct of the feasibility study for Operable Unit 5 at the Fernald Environmental Management Project (FEMP), fourteen remedial alternatives were retained for detailed analysis. Each remedial alternative was composed of combinations of remedial technologies and processes which were earlier determined to be best suited for addressing the media-specific contaminants found at the FEMP site, and achieving desired remedial action objectives

  14. Cost-benefit and cost-savings analyses of antiarrhythmic medication monitoring.

    Science.gov (United States)

    Snider, Melissa; Carnes, Cynthia; Grover, Janel; Davis, Rich; Kalbfleisch, Steven

    2012-09-15

    The economic impact of pharmacist-managed antiarrhythmic drug therapy monitoring on an academic medical center's electrophysiology (EP) program was investigated. Data were collected for the initial two years of patient visits (n = 816) to a pharmacist-run clinic for antiarrhythmic drug therapy monitoring. A retrospective cost analysis was conducted to assess the direct costs associated with three appointment models: (1) a clinic office visit only, (2) a clinic visit involving electrocardiography and basic laboratory tests, and (3) a clinic visit including pulmonary function testing and chest x-rays in addition to electrocardiography and laboratory testing. A subset of patient cases (n = 18) were included in a crossover analysis comparing pharmacist clinic care and usual care in an EP physician clinic. The primary endpoints were the cost benefits and cost savings associated with pharmacy-clinic care versus usual care. A secondary endpoint was improvement of overall EP program efficiency. The payer mix was 61.6% (n = 498) Medicare, 33.2% (n = 268) managed care, and 5.2% (n = 42) other. Positive contribution margins were demonstrated for all appointment models. The pharmacist-managed clinic also yielded cost savings by reducing overall patient care charges by 21% relative to usual care. By the second year, the pharmacy clinic improved EP program efficiency by scheduling an average of 24 patients per week, in effect freeing up one day per week of EP physician time to spend on other clinical activities. Pharmacist monitoring of antiarrhythmic drug therapy in an out-patient clinic provided cost benefits, cost savings, and improved overall EP program efficiency.

  15. Cost of elective percutaneous coronary intervention in Malaysia: a multicentre cross-sectional costing study.

    Science.gov (United States)

    Lee, Kun Yun; Ong, Tiong Kiam; Low, Ee Vien; Liow, Siow Yen; Anchah, Lawrence; Hamzah, Syuhada; Liew, Houng Bang; Ali, Rosli Mohd; Ismail, Omar; Ahmad, Wan Azman Wan; Said, Mas Ayu; Dahlui, Maznah

    2017-05-28

    Limitations in the quality and access of cost data from low-income and middle-income countries constrain the implementation of economic evaluations. With the increasing prevalence of coronary artery disease in Malaysia, cost information is vital for cardiac service expansion. We aim to calculate the hospitalisation cost of percutaneous coronary intervention (PCI), using a data collection method customised to local setting of limited data availability. This is a cross-sectional costing study from the perspective of healthcare providers, using top-down approach, from January to June 2014. Cost items under each unit of analysis involved in the provision of PCI service were identified, valuated and calculated to produce unit cost estimates. Five public cardiac centres participated. All the centres provide full-fledged cardiology services. They are also the tertiary referral centres of their respective regions. The cost was calculated for elective PCI procedure in each centre. PCI conducted for urgent/emergent indication or for patients with shock and haemodynamic instability were excluded. The outcome measures of interest were the unit costs at the two units of analysis, namely cardiac ward admission and cardiac catheterisation utilisation, which made up the total hospitalisation cost. The average hospitalisation cost ranged between RM11 471 (US$3186) and RM14 465 (US$4018). PCI consumables were the dominant cost item at all centres. The centre with daycare establishment recorded the lowest admission cost and total hospitalisation cost. Comprehensive results from all centres enable comparison at the levels of cost items, unit of analysis and total costs. This generates important information on cost variations between centres, thus providing valuable guidance for service planning. Alternative procurement practices for PCI consumables may deliver cost reduction. For countries with limited data availability, costing method tailored based on country setting can be used for

  16. 48 CFR 9904.401 - Cost accounting standard-consistency in estimating, accumulating and reporting costs.

    Science.gov (United States)

    2010-10-01

    ... Regulations System COST ACCOUNTING STANDARDS BOARD, OFFICE OF FEDERAL PROCUREMENT POLICY, OFFICE OF MANAGEMENT AND BUDGET PROCUREMENT PRACTICES AND COST ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS 9904.401 Cost... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Cost accounting standard...

  17. FORMALIZING PRODUCT COST DISTORTION: The Impact of Volume-Related Allocation Bases on Cost Information

    Directory of Open Access Journals (Sweden)

    Johnny Jermias

    2003-09-01

    Full Text Available The purpose o f this study is to formally analyze product cost distortions resulting from the process of allocating costs to products based on Activity-Based Costing (ABC and the conventional product costing systems. The model developed in this paper rigorously shows the impact of treating costs that are not volume related as if they are. The model demonstrates that the source of product cost distortion is the difference between the proportion of driver used by each product in ABC and the proportion of the base used by the same product in the conventional costing systems. The difference arises because the conventional costing systems ignore the existence of batch-related and product-related costs. The model predicts a positive association between volume and size diversity with product cost distortions. When interaction between volume and size diversity exists, the distortion is either mitigated or exacerbated. The magnitude of the distortion is jointly determined by the size of the differences and the size of the total indirect costs.

  18. Costing Practices in Healthcare

    DEFF Research Database (Denmark)

    Chapman, Christopher; Kern, Anja; Laguecir, Aziza

    2014-01-01

    .e., Diagnosis Related Group (DRG) systems, and costing practices. DRG-based payment systems strongly influence costing practices in multiple ways. In particular, setting DRG tariffs requires highly standardized costing practices linked with specific skill sets from management accountants and brings other...... jurisdictions (e.g., clinical coding) to bear on costing practice. These factors contribute to the fragmentation of the jurisdiction of management accounting.......The rising cost of healthcare is a globally pressing concern. This makes detailed attention to the way in which costing is carried out of central importance. This article offers a framework for considering the interdependencies between a dominant element of the contemporary healthcare context, i...

  19. Cost analysis and cost justification of automated data processing in the clinical laboratory.

    Science.gov (United States)

    Westlake, G E

    1983-03-01

    Prospective cost analysis of alternative data processing systems can be facilitated by proper selection of the costs to be analyzed and realistic appraisal of the effect on staffing. When comparing projects with dissimilar cash flows, techniques such as analysis of net present value can be helpful in identifying financial benefits. Confidence and accuracy in prospective analyses will increase as more retrospective studies are published. Several accounts now in the literature describe long-term experience with turnkey laboratory information systems. Acknowledging the difficulty in longitudinal studies, they all report favorable effects on labor costs and recovery of lost charges. Enthusiasm is also expressed for the many intangible benefits of the systems. Several trends suggest that cost justification and cost effectiveness will be more easily demonstrated in the future. These are the rapidly decreasing cost of hardware (with corresponding reduction in service costs) and the entry into the market of additional systems designed for medium to small hospitals. The effect of broadening the sales base may be lower software prices. Finally, operational and executive data management and reporting are destined to become the premier extensions of the LIS for cost justification. Aptly applied, these facilities can promote understanding of costs, control of costs, and greater efficiency in providing laboratory services.

  20. Nuclear power costs

    International Nuclear Information System (INIS)

    1963-01-01

    A report prepared by the IAEA Secretariat and presented to the seventh session of the Agency's General Conference says that information on nuclear power costs is now rapidly moving from the domain of uncertain estimates to that of tested factual data. As more and more nuclear power stations are being built and put into operation, more information on the actual costs incurred is becoming available. This is the fourth report on nuclear power costs to be submitted to the IAEA General Conference. The report last year gave cost information on 38 nuclear power projects, 17 of which have already gone into operation. Certain significant changes in the data given last year are included-in the present report; besides, information is given on seven new plants. The report is divided into two parts, the first on recent developments and current trends in nuclear power costs and the second on the use of the cost data for economic comparisons. Both stress the fact that the margin of uncertainty in the basic data has lately been drastically reduced. At the same time, it is pointed out, some degree of uncertainty is inherent in the assumptions made in arriving at over-all generating cost figures, especially when - as is usually the case - a nuclear plant is part of an integrated power system

  1. 75 FR 1363 - Integrated System Power Rates

    Science.gov (United States)

    2010-01-11

    ... increased. Those customers taking transformation service will be affected by an increase in that rate... Regulation Purchased. With factors defined as follows: RPA = The Customer's specific monthly dollar amount of... formulas provided in Customers' contracts indicate an overrun on Hydro Peaking Power, and investigation...

  2. The Utility of Mass Violence

    Science.gov (United States)

    2009-09-01

    antibiotic treatment, the C-dif bacteria will overpopulate and overrun the intestines and colon. This infestation causes weakness, dehydration, fever...intervened on several fronts. They curbed the Ottoman’s trade monopoly and established their own naval routes to Asia . Vast imports of Spanish silver

  3. Instantaneous Project Controls: Current Status, State of the Art, Benefits, and Strategies

    Science.gov (United States)

    Abbaszadegan, Amin

    2016-01-01

    Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In…

  4. Time-driven activity-based costing to identify opportunities for cost reduction in pediatric appendectomy.

    Science.gov (United States)

    Yu, Yangyang R; Abbas, Paulette I; Smith, Carolyn M; Carberry, Kathleen E; Ren, Hui; Patel, Binita; Nuchtern, Jed G; Lopez, Monica E

    2016-12-01

    As reimbursement programs shift to value-based payment models emphasizing quality and efficient healthcare delivery, there exists a need to better understand process management to unearth true costs of patient care. We sought to identify cost-reduction opportunities in simple appendicitis management by applying a time-driven activity-based costing (TDABC) methodology to this high-volume surgical condition. Process maps were created using medical record time stamps. Labor capacity cost rates were calculated using national median physician salaries, weighted nurse-patient ratios, and hospital cost data. Consumable costs for supplies, pharmacy, laboratory, and food were derived from the hospital general ledger. Time-driven activity-based costing resulted in precise per-minute calculation of personnel costs. Highest costs were in the operating room ($747.07), hospital floor ($388.20), and emergency department ($296.21). Major contributors to length of stay were emergency department evaluation (270min), operating room availability (395min), and post-operative monitoring (1128min). The TDABC model led to $1712.16 in personnel costs and $1041.23 in consumable costs for a total appendicitis cost of $2753.39. Inefficiencies in healthcare delivery can be identified through TDABC. Triage-based standing delegation orders, advanced practice providers, and same day discharge protocols are proposed cost-reducing interventions to optimize value-based care for simple appendicitis. II. Copyright © 2016 Elsevier Inc. All rights reserved.

  5. Analysis of Cost Growth and Cost Composition in the Defense Aerospace Industry

    Science.gov (United States)

    1988-09-01

    Making. New York: Harcourt Brace Jovanovich, Inc., 1977. 16. Horngren , Charles T. Cost Accounting , A Managerial Emphasis. Englewood Cliffs NJ: Prentice...58 7. Scatter Plot of Cost /DL Hour Ratio, Data Set C ................ .................. 59 8. Scatter Plot of Cost /DL S Ratio, Data Set...C 62 9. Scatter Plot of Cost /DL S Ratio, Then-Year Dollars ................... .................... 63 10. Scatter Plot of OH/TC Ratio, Data Set C

  6. Future Costs, Fixed Healthcare Budgets, and the Decision Rules of Cost-Effectiveness Analysis.

    Science.gov (United States)

    van Baal, Pieter; Meltzer, David; Brouwer, Werner

    2016-02-01

    Life-saving medical technologies result in additional demand for health care due to increased life expectancy. However, most economic evaluations do not include all medical costs that may result from this additional demand in health care and include only future costs of related illnesses. Although there has been much debate regarding the question to which extent future costs should be included from a societal perspective, the appropriate role of future medical costs in the widely adopted but more narrow healthcare perspective has been neglected. Using a theoretical model, we demonstrate that optimal decision rules for cost-effectiveness analyses assuming fixed healthcare budgets dictate that future costs of both related and unrelated medical care should be included. Practical relevance of including the costs of future unrelated medical care is illustrated using the example of transcatheter aortic valve implantation. Our findings suggest that guidelines should prescribe inclusion of these costs. Copyright © 2014 John Wiley & Sons, Ltd.

  7. Costs associated with wheeling

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    Wheeling costs are incurred by all companies that experience a change in power flows over their transmission lines during a specific transaction, whether or not the lines of that company are part of the contract path. The costs of providing wheeling service differ from one system to another and from one kind of wheeling transaction to another. While most transactions may be completed using existing capacity, others may require an increase in line. Depending on the situation, some cost components may be high, low, negative, or not incurred at all. This article discusses two general categories of costs; transactional and capital. The former are all operation, maintenance and opportunity costs incurred in completing a specific transaction assuming the existence of adequate capacity. Capital costs are the costs of major new equipment purchases and lines necessary to provide any increased level of transmission services

  8. Ethical objections against including life-extension costs in cost-effectiveness analysis: a consistent approach.

    Science.gov (United States)

    Gandjour, Afschin; Müller, Dirk

    2014-10-01

    One of the major ethical concerns regarding cost-effectiveness analysis in health care has been the inclusion of life-extension costs ("it is cheaper to let people die"). For this reason, many analysts have opted to rule out life-extension costs from the analysis. However, surprisingly little has been written in the health economics literature regarding this ethical concern and the resulting practice. The purpose of this work was to present a framework and potential solution for ethical objections against life-extension costs. This work found three levels of ethical concern: (i) with respect to all life-extension costs (disease-related and -unrelated); (ii) with respect to disease-unrelated costs only; and (iii) regarding disease-unrelated costs plus disease-related costs not influenced by the intervention. Excluding all life-extension costs for ethical reasons would require-for reasons of consistency-a simultaneous exclusion of savings from reducing morbidity. At the other extreme, excluding only disease-unrelated life-extension costs for ethical reasons would require-again for reasons of consistency-the exclusion of health gains due to treatment of unrelated diseases. Therefore, addressing ethical concerns regarding the inclusion of life-extension costs necessitates fundamental changes in the calculation of cost effectiveness.

  9. Cost and cost-effectiveness of conventional and liquid-based ...

    African Journals Online (AJOL)

    Methods. The unit of effectiveness was defined as the number of cervical intraepithelial neoplasm (CIN) II or higher lesions detected. Costs were assessed retrospectively for the financial year (2010/11) from a laboratory service provider perspective. A cost-effectiveness analysis was performed by combining secondary data ...

  10. 20 CFR 627.435 - Cost principles and allowable costs.

    Science.gov (United States)

    2010-04-01

    ... system, including the costs of hearings and appeals, and related expenses such as lawyers' fees. Legal...) Legal expenses for the prosecution of claims against the Federal Government, including appeals to an... incurred by the SJTCC, HRIC, PIC's, and other advisory councils or committees; (3) Advertising costs; (4...

  11. The scope of costs in alcohol studies: Cost-of-illness studies differ from economic evaluations.

    Science.gov (United States)

    van Gils, Paul F; Hamberg-van Reenen, Heleen H; van den Berg, Matthijs; Tariq, Luqman; de Wit, G Ardine

    2010-07-06

    Alcohol abuse results in problems on various levels in society. In terms of health, alcohol abuse is not only an important risk factor for chronic disease, but it is also related to injuries. Social harms which can be related to drinking include interpersonal problems, work problems, violent and other crimes. The scope of societal costs related to alcohol abuse in principle should be the same for both economic evaluations and cost-of-illness studies. In general, economic evaluations report a small part of all societal costs. To determine the cost- effectiveness of an intervention it is necessary that all costs and benefits are included. The purpose of this study is to describe and quantify the difference in societal costs incorporated in economic evaluations and cost-of-illness studies on alcohol abuse. To investigate the economic costs attributable to alcohol in cost-of-illness studies we used the results of a recent systematic review (June 2009). We performed a PubMed search to identify economic evaluations on alcohol interventions. Only economic evaluations in which two or more interventions were compared from a societal perspective were included. The proportion of health care costs and the proportion of societal costs were estimated in both type of studies. The proportion of healthcare costs in cost-of-illness studies was 17% and the proportion of societal costs 83%. In economic evaluations, the proportion of healthcare costs was 57%, and the proportion of societal costs was 43%. The costs included in economic evaluations performed from a societal perspective do not correspond with those included in cost-of-illness studies. Economic evaluations on alcohol abuse underreport true societal cost of alcohol abuse. When considering implementation of alcohol abuse interventions, policy makers should take into account that economic evaluations from the societal perspective might underestimate the total effects and costs of interventions.

  12. Costs of endometriosis in Austria: a survey of direct and indirect costs.

    Science.gov (United States)

    Prast, Johanna; Oppelt, Peter; Shamiyeh, Andreas; Shebl, Omar; Brandes, Iris; Haas, Dietmar

    2013-09-01

    The literature includes a wealth of medical data on endometriosis, but the economic significance of the condition has so far been neglected. An analysis of hospital costs for endometriosis in Austria was, therefore, carried out for economic purposes. Seventy-three patients with endometriosis were included in the study. A bottom-up approach was used to collect data on the average hospital costs of an endometriosis patient over a time period of 1 year. In addition, a prevalence approach was used that allows subsequent estimation of the total costs of endometriosis for the health-care system in Austria for that period. Retrospective questionnaire survey was conducted. The average annual costs of one case of endometriosis are 7,712, with 5,605.55 attributable to direct costs and 2,106.34 to indirect costs. This indicates an overall economic burden of 328 million. In-patient care (45 %) and loss of productivity (27 %) were identified as the major cost factors. The patients themselves pay for 13 % of the costs (through out-of-pocket payments). This study impressively demonstrates the financial burden on the economy and on each individually affected patient caused by the disease of endometriosis. The massive consumption of resources represents a high level of usage of the medical services provided. The question arises as to whether more timely diagnosis, followed by better-targeted treatment, might have the potential to reduce these costs. The overall economic burden of endometriosis in Austria is currently comparable with that of Parkinson's disease.

  13. Cost accounting for the radiologist.

    Science.gov (United States)

    Gentili, Amilcare

    2014-05-01

    Cost accounting is the branch of managerial accounting that deals with the analysis of the costs of a product or service. This article reviews methods of classifying and allocating costs and relationships among costs, volume, and revenues. Radiology practices need to know the cost of a procedure or service to determine the selling price of a product, bid on contracts, analyze profitability, and facilitate cost control and cost reduction.

  14. 42 CFR 423.6 - Cost-sharing in beneficiary education and enrollment-related costs.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Cost-sharing in beneficiary education and enrollment-related costs. 423.6 Section 423.6 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES... BENEFIT General Provisions § 423.6 Cost-sharing in beneficiary education and enrollment-related costs. The...

  15. The Hidden Cost of Regulation: The Administrative Cost of Reporting Serious Reportable Events.

    Science.gov (United States)

    Blanchfield, Bonnie B; Acharya, Bijay; Mort, Elizabeth

    2018-04-01

    More than half of the 50 states (27) and the District of Columbia require reporting of Serous Reportable Events (SREs). The goal is to hold providers accountable and improve patient safety, but there is little information about the administrative cost of this reporting requirement. This study was conducted to identify costs associated with investigating and reporting SREs. This qualitative study used case study methods that included interviewing staff and review of data and documents to investigate each SRE occurring at one academic medical center during fiscal year 2013. A framework of tasks and a model to categorize costs was created. Time was summarized and costs were estimated for each SRE. The administrative cost to process 44 SREs was estimated at $353,291, an average cost of $8,029 per SRE, ranging $6,653 for an environmental-related SRE to $21,276 for a device-related SRE. Care management SREs occurred most frequently, costing an average $7,201 per SRE. Surgical SREs, the most expensive on average, cost $9,123 per SRE. Investigation of events accounted for 64.5% of total cost; public reporting, 17.2%; internal reporting, 10.2%; finance and administration, 6.0%; and 2.1%, other. Even with 26 states mandating reporting, the 17.2% incremental cost of public reporting is substantial. Policy makers should consider the opportunity costs of these resources, averaging $8,029 per SRE, when mandating reporting. The benefits of public reporting should be collectively reviewed to ensure that the incremental costs in this resource-constrained environment continue to improve patient safety and that trade-offs are acknowledged. Copyright © 2017 The Joint Commission. Published by Elsevier Inc. All rights reserved.

  16. Assessing the cost of electronic health records: a review of cost indicators.

    Science.gov (United States)

    Gallego, Ana Isabel; Gagnon, Marie-Pierre; Desmartis, Marie

    2010-11-01

    We systematically reviewed PubMed and EBSCO business, looking for cost indicators of electronic health record (EHR) implementations and their associated benefit indicators. We provide a set of the most common cost and benefit (CB) indicators used in the EHR literature, as well as an overall estimate of the CB related to EHR implementation. Overall, CB evaluation of EHR implementation showed a rapid capital-recovering process. On average, the annual benefits were 76.5% of the first-year costs and 308.6% of the annual costs. However, the initial investments were not recovered in a few studied implementations. Distinctions in reporting fixed and variable costs are suggested.

  17. Cost effects of Cu powder and bentonite on the disposal costs of an HLW repository in

    International Nuclear Information System (INIS)

    Kim, Sung Ki; Lee, Min Soo; Lee, Jong Youl; Choi, Heui Joo; Choi, Jong Won

    2008-01-01

    This paper provides the cost effect results of Cu powder and bentonite on the disposal cost for an HLW repository in Korea. In the cost analysis for both of these cost drivers, the price of Cu powder and the bentonite can affect the canister cost and the bentonite cost of the disposal holes as well as backfilling cost of the tunnels, respectively. Finally, we found that the unit cost of Cu and bentonite was the dominant cost drivers for the surface and underground facilities of an HLW repository. Therefore, an optimization of a canister and the layout of a disposal hole and disposal tunnels are essential to decrease the direct disposal cost of spent fuels. The disposal costs can be largely divided into two parts such as a surface facilities' cost and an underground facilities' cost. According to the KRS' cost analysis, the encapsulation material as well as the buffering and backfilling cost were the significant costs. Especially, a canister's cost was approximately estimated to be more than one fourth of the overall disposal costs. So it can be estimated that the unit cost of Cu powder is an important cost diver. Because the outer shell of the canister was made of Cu powder by a cold spray coating method. In addition, the unit cost of bentonite can also affect the buffering and the backfilling costs of the disposal holes and the disposal tunnels. But, these material costs will be highly expensive and unstable due to the modernization of the developing countries. So the studies for a material cost should be continued to identify the actual cost of an HLW repository

  18. [Costing nuclear medicine diagnostic procedures].

    Science.gov (United States)

    Markou, Pavlos

    2005-01-01

    To the Editor: Referring to a recent special report about the cost analysis of twenty-nine nuclear medicine procedures, I would like to clarify some basic aspects for determining costs of nuclear medicine procedure with various costing methodologies. Activity Based Costing (ABC) method, is a new approach in imaging services costing that can provide the most accurate cost data, but is difficult to perform in nuclear medicine diagnostic procedures. That is because ABC requires determining and analyzing all direct and indirect costs of each procedure, according all its activities. Traditional costing methods, like those for estimating incomes and expenses per procedure or fixed and variable costs per procedure, which are widely used in break-even point analysis and the method of ratio-of-costs-to-charges per procedure may be easily performed in nuclear medicine departments, to evaluate the variability and differences between costs and reimbursement - charges.

  19. The costs of nuclear power

    International Nuclear Information System (INIS)

    Vestenhaug, O.; Sauar, T.O.; Nielsen, P.O.

    1979-01-01

    A study has been made by Scandpower A/S of the costs of nuclear power in Sweden. It is based on the known costs of existing Swedish nuclear power plants and forecasts of the expected costs of the Swedish nuclear power programme. special emphasis has been put on the fuel cycle costs and future costs of spent fuel processing, waste disposal and decommissioning. Costs are calculated in 1978 Swedish crowns, using the retail price index. An actual interest rate of 4% is used, with depreciation period of 25 years and a plant lifetime of 30 years. Power production costs are estimated to be about 7.7 oere/kWh in 1978, rising to 10.5 oere/kWh in 2000. The cost is distributed with one third each to capital costs, operating costs and fuel costs, the last rising to 40% of the total at the end of the century. The main single factor in future costs is the price of uranium. If desired, Sweden can probably be self-sufficient in uranium in 2000 at a lower cost than assumed here. National research costs which, in Scandpower's opinion, can be debited to the commercial nuclear power programme are about 0.3 oere/kWh. (JIW)

  20. Costing improvement of remanufacturing crankshaft by integrating Mahalanobis-Taguchi System and Activity based Costing

    Science.gov (United States)

    Abu, M. Y.; Nor, E. E. Mohd; Rahman, M. S. Abd

    2018-04-01

    Integration between quality and costing system is very crucial in order to achieve an accurate product cost and profit. Current practice by most of remanufacturers, there are still lacking on optimization during the remanufacturing process which contributed to incorrect variables consideration to the costing system. Meanwhile, traditional costing accounting being practice has distortion in the cost unit which lead to inaccurate cost of product. The aim of this work is to identify the critical and non-critical variables during remanufacturing process using Mahalanobis-Taguchi System and simultaneously estimate the cost using Activity Based Costing method. The orthogonal array was applied to indicate the contribution of variables in the factorial effect graph and the critical variables were considered with overhead costs that are actually demanding the activities. This work improved the quality inspection together with costing system to produce an accurate profitability information. As a result, the cost per unit of remanufactured crankshaft of MAN engine model with 5 critical crankpins is MYR609.50 while Detroit engine model with 4 critical crankpins is MYR1254.80. The significant of output demonstrated through promoting green by reducing re-melting process of damaged parts to ensure consistent benefit of return cores.

  1. Realistic costs of carbon capture

    Energy Technology Data Exchange (ETDEWEB)

    Al Juaied, Mohammed (Harvard Univ., Cambridge, MA (US). Belfer Center for Science and International Affiaris); Whitmore, Adam (Hydrogen Energy International Ltd., Weybridge (GB))

    2009-07-01

    There is a growing interest in carbon capture and storage (CCS) as a means of reducing carbon dioxide (CO2) emissions. However there are substantial uncertainties about the costs of CCS. Costs for pre-combustion capture with compression (i.e. excluding costs of transport and storage and any revenue from EOR associated with storage) are examined in this discussion paper for First-of-a-Kind (FOAK) plant and for more mature technologies, or Nth-of-a-Kind plant (NOAK). For FOAK plant using solid fuels the levelised cost of electricity on a 2008 basis is approximately 10 cents/kWh higher with capture than for conventional plants (with a range of 8-12 cents/kWh). Costs of abatement are found typically to be approximately US$150/tCO2 avoided (with a range of US$120-180/tCO2 avoided). For NOAK plants the additional cost of electricity with capture is approximately 2-5 cents/kWh, with costs of the range of US$35-70/tCO2 avoided. Costs of abatement with carbon capture for other fuels and technologies are also estimated for NOAK plants. The costs of abatement are calculated with reference to conventional SCPC plant for both emissions and costs of electricity. Estimates for both FOAK and NOAK are mainly based on cost data from 2008, which was at the end of a period of sustained escalation in the costs of power generation plant and other large capital projects. There are now indications of costs falling from these levels. This may reduce the costs of abatement and costs presented here may be 'peak of the market' estimates. If general cost levels return, for example, to those prevailing in 2005 to 2006 (by which time significant cost escalation had already occurred from previous levels), then costs of capture and compression for FOAK plants are expected to be US$110/tCO2 avoided (with a range of US$90-135/tCO2 avoided). For NOAK plants costs are expected to be US$25-50/tCO2. Based on these considerations a likely representative range of costs of abatement from CCS

  2. Cost-aware Pre-training for Multiclass Cost-sensitive Deep Learning

    OpenAIRE

    Chung, Yu-An; Lin, Hsuan-Tien; Yang, Shao-Wen

    2015-01-01

    Deep learning has been one of the most prominent machine learning techniques nowadays, being the state-of-the-art on a broad range of applications where automatic feature extraction is needed. Many such applications also demand varying costs for different types of mis-classification errors, but it is not clear whether or how such cost information can be incorporated into deep learning to improve performance. In this work, we propose a novel cost-aware algorithm that takes into account the cos...

  3. Incorporating indirect costs into a cost-benefit analysis of laparoscopic adjustable gastric banding.

    Science.gov (United States)

    Finkelstein, Eric A; Allaire, Benjamin T; Dibonaventura, Marco Dacosta; Burgess, Somali M

    2012-01-01

    The objective of this study was to estimate the time to breakeven and 5-year net costs of laparoscopic adjustable gastric banding (LAGB) taking both direct and indirect costs and cost savings into account. Estimates of direct cost savings from LAGB were available from the literature. Although longitudinal data on indirect cost savings were not available, these estimates were generated by quantifying the relationship between medical expenditures and absenteeism and between medical expenditures and presenteeism (reduced on-the-job productivity) and combining these elasticity estimates with estimates of the direct cost savings to generate total savings. These savings were then combined with the direct and indirect costs of the procedure to quantify net savings. By including indirect costs, the time to breakeven was reduced by half a year, from 16 to 14 quarters. After 5 years, net savings in medical expenditures from a gastric banding procedure were estimated to be $4970 (±$3090). Including absenteeism increased savings to $6180 (±$3550). Savings were further increased to $10,960 (±$5864) when both absenteeism and presenteeism estimates were included. This study presented a novel approach for including absenteeism and presenteeism estimates in cost-benefit analyses. Application of the approach to gastric banding among surgery-eligible obese employees revealed that the inclusion of indirect costs and cost savings improves the business case for the procedure. This approach can easily be extended to other populations and treatments. Copyright © 2012 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.

  4. Estimating productivity costs using the friction cost approach in practice: a systematic review.

    Science.gov (United States)

    Kigozi, Jesse; Jowett, Sue; Lewis, Martyn; Barton, Pelham; Coast, Joanna

    2016-01-01

    The choice of the most appropriate approach to valuing productivity loss has received much debate in the literature. The friction cost approach has been proposed as a more appropriate alternative to the human capital approach when valuing productivity loss, although its application remains limited. This study reviews application of the friction cost approach in health economic studies and examines how its use varies in practice across different country settings. A systematic review was performed to identify economic evaluation studies that have estimated productivity costs using the friction cost approach and published in English from 1996 to 2013. A standard template was developed and used to extract information from studies meeting the inclusion criteria. The search yielded 46 studies from 12 countries. Of these, 28 were from the Netherlands. Thirty-five studies reported the length of friction period used, with only 16 stating explicitly the source of the friction period. Nine studies reported the elasticity correction factor used. The reported friction cost approach methods used to derive productivity costs varied in quality across studies from different countries. Few health economic studies have estimated productivity costs using the friction cost approach. The estimation and reporting of productivity costs using this method appears to differ in quality by country. The review reveals gaps and lack of clarity in reporting of methods for friction cost evaluation. Generating reporting guidelines and country-specific parameters for the friction cost approach is recommended if increased application and accuracy of the method is to be realized.

  5. A Systematic Review of Cost-Effectiveness Studies Reporting Cost-per-DALY Averted.

    Directory of Open Access Journals (Sweden)

    Peter J Neumann

    Full Text Available Calculating the cost per disability-adjusted life years (DALYs averted associated with interventions is an increasing popular means of assessing the cost-effectiveness of strategies to improve population health. However, there has been no systematic attempt to characterize the literature and its evolution.We conducted a systematic review of cost-effectiveness studies reporting cost-per-DALY averted from 2000 through 2015. We developed the Global Health Cost-Effectiveness Analysis (GHCEA Registry, a repository of English-language cost-per-DALY averted studies indexed in PubMed. To identify candidate studies, we searched PubMed for articles with titles or abstracts containing the phrases "disability-adjusted" or "DALY". Two reviewers with training in health economics independently reviewed each article selected in our abstract review, gathering information using a standardized data collection form. We summarized descriptive characteristics on study methodology: e.g., intervention type, country of study, study funder, study perspective, along with methodological and reporting practices over two time periods: 2000-2009 and 2010-2015. We analyzed the types of costs included in analyses, the study quality on a scale from 1 (low to 7 (high, and examined the correlation between diseases researched and the burden of disease in different world regions.We identified 479 cost-per-DALY averted studies published from 2000 through 2015. Studies from Sub-Saharan Africa comprised the largest portion of published studies. The disease areas most commonly studied were communicable, maternal, neonatal, and nutritional disorders (67%, followed by non-communicable diseases (28%. A high proportion of studies evaluated primary prevention strategies (59%. Pharmaceutical interventions were commonly assessed (32% followed by immunizations (28%. Adherence to good practices for conducting and reporting cost-effectiveness analysis varied considerably. Studies mainly included

  6. The unit cost factors and calculation methods for decommissioning - Cost estimation of nuclear research facilities

    International Nuclear Information System (INIS)

    Kwan-Seong Jeong; Dong-Gyu Lee; Chong-Hun Jung; Kune-Woo Lee

    2007-01-01

    Available in abstract form only. Full text of publication follows: The uncertainties of decommissioning costs increase high due to several conditions. Decommissioning cost estimation depends on the complexity of nuclear installations, its site-specific physical and radiological inventories. Therefore, the decommissioning costs of nuclear research facilities must be estimated in accordance with the detailed sub-tasks and resources by the tasks of decommissioning activities. By selecting the classified activities and resources, costs are calculated by the items and then the total costs of all decommissioning activities are reshuffled to match with its usage and objectives. And the decommissioning cost of nuclear research facilities is calculated by applying a unit cost factor method on which classification of decommissioning works fitted with the features and specifications of decommissioning objects and establishment of composition factors are based. Decommissioning costs of nuclear research facilities are composed of labor cost, equipment and materials cost. Of these three categorical costs, the calculation of labor costs are very important because decommissioning activities mainly depend on labor force. Labor costs in decommissioning activities are calculated on the basis of working time consumed in decommissioning objects and works. The working times are figured out of unit cost factors and work difficulty factors. Finally, labor costs are figured out by using these factors as parameters of calculation. The accuracy of decommissioning cost estimation results is much higher compared to the real decommissioning works. (authors)

  7. NPP construction cost in Canada

    International Nuclear Information System (INIS)

    Gorshkov, A.L.

    1988-01-01

    The structure of capital costs during NPP construction in Canada is considered. Capital costs comprise direct costs (cost of the ground and ground rights, infrastructure, reactor equipment, turbogenerators, electrotechnical equipment, auxiliary equipment), indirect costs (construction equipment and services, engineering works and management services, insurance payments, freight, training, operating expenditures), capital per cents for the period of construction and cost of heavy water storages. It proceeds from the analysis of the construction cost structure for a NPP with the CANDU reactor of unit power of 515, 740 and 880 MW, that direct costs make up on the average 62%

  8. Implementing Replacement Cost Accounting

    Science.gov (United States)

    1976-12-01

    cost accounting Clickener, John Ross Monterey, California. Naval Postgraduate School http://hdl.handle.net/10945/17810 Downloaded from NPS Archive...Calhoun IMPLEMENTING REPLACEMENT COST ACCOUNTING John Ross CHckener NAVAL POSTGRADUATE SCHOOL Monterey, California THESIS IMPLEMENTING REPLACEMENT COST ...Implementing Replacement Cost Accounting 7. AUTHORS John Ross Clickener READ INSTRUCTIONS BEFORE COMPLETING FORM 3. RECIPIENT’S CATALOG NUMBER 9. TYRE OF

  9. The scope of costs in alcohol studies: Cost-of-illness studies differ from economic evaluations

    Directory of Open Access Journals (Sweden)

    Tariq Luqman

    2010-07-01

    Full Text Available Abstract Background Alcohol abuse results in problems on various levels in society. In terms of health, alcohol abuse is not only an important risk factor for chronic disease, but it is also related to injuries. Social harms which can be related to drinking include interpersonal problems, work problems, violent and other crimes. The scope of societal costs related to alcohol abuse in principle should be the same for both economic evaluations and cost-of-illness studies. In general, economic evaluations report a small part of all societal costs. To determine the cost- effectiveness of an intervention it is necessary that all costs and benefits are included. The purpose of this study is to describe and quantify the difference in societal costs incorporated in economic evaluations and cost-of-illness studies on alcohol abuse. Method To investigate the economic costs attributable to alcohol in cost-of-illness studies we used the results of a recent systematic review (June 2009. We performed a PubMed search to identify economic evaluations on alcohol interventions. Only economic evaluations in which two or more interventions were compared from a societal perspective were included. The proportion of health care costs and the proportion of societal costs were estimated in both type of studies. Results The proportion of healthcare costs in cost-of-illness studies was 17% and the proportion of societal costs 83%. In economic evaluations, the proportion of healthcare costs was 57%, and the proportion of societal costs was 43%. Conclusions The costs included in economic evaluations performed from a societal perspective do not correspond with those included in cost-of-illness studies. Economic evaluations on alcohol abuse underreport true societal cost of alcohol abuse. When considering implementation of alcohol abuse interventions, policy makers should take into account that economic evaluations from the societal perspective might underestimate the total

  10. Cost and cost-effectiveness of PPM-DOTS for tuberculosis control: evidence from India.

    OpenAIRE

    Floyd, Katherine; Arora, V. K.; Murthy, K. J. R.; Lonnroth, Knut; Singla, Neeta; Akbar, Y.; Zignol, Matteo; Uplekar, Mukund

    2006-01-01

    OBJECTIVE: To assess the cost and cost-effectiveness of the Public-Private Mix DOTS (PPM-DOTS) strategy for tuberculosis (TB) control in India. METHODS: We collected data on the costs and effects of pilot PPM-DOTS projects in Delhi and Hyderabad using documentary data and interviews. The cost of PPM-DOTS was compared with public sector DOTS (i.e. DOTS delivered through public sector facilities only) and non-DOTS treatment in the private sector. Costs for 2002 in US$ were assessed for the publ...

  11. Cost-of-illness studies and cost-effectiveness analyses in anxiety disorders: a systematic review.

    Science.gov (United States)

    Konnopka, Alexander; Leichsenring, Falk; Leibing, Eric; König, Hans-Helmut

    2009-04-01

    To review cost-of-illness studies (COI) and cost-effectiveness analyses (CEA) conducted for anxiety disorders. Based on a database search in Pubmed, PsychINFO and NHS EED, studies were classified according to various criteria. Cost data were inflated and converted to 2005 US-$ purchasing power parities (PPP). We finally identified 20 COI and 11 CEA of which most concentrated on panic disorder (PD) and generalized anxiety disorder (GAD). Differing inclusion of cost categories limited comparability of COI. PD and GAD tended to show higher direct costs per case, but lower direct cost per inhabitant than social and specific phobias. Different measures of effectiveness severely limited comparability of CEA. Overall CEA analysed 26 therapeutic or interventional strategies mostly compared to standard treatment, 8 of them resulting in lower better effectiveness and costs than the comparator. Anxiety disorders cause considerable costs. More research on phobias, more standardised inclusion of cost categories in COI and a wider use of comparable effectiveness measures (like QALYs) in CEA is needed.

  12. Applying Activity Based Costing (ABC) Method to Calculate Cost Price in Hospital and Remedy Services.

    Science.gov (United States)

    Rajabi, A; Dabiri, A

    2012-01-01

    Activity Based Costing (ABC) is one of the new methods began appearing as a costing methodology in the 1990's. It calculates cost price by determining the usage of resources. In this study, ABC method was used for calculating cost price of remedial services in hospitals. To apply ABC method, Shahid Faghihi Hospital was selected. First, hospital units were divided into three main departments: administrative, diagnostic, and hospitalized. Second, activity centers were defined by the activity analysis method. Third, costs of administrative activity centers were allocated into diagnostic and operational departments based on the cost driver. Finally, with regard to the usage of cost objectives from services of activity centers, the cost price of medical services was calculated. The cost price from ABC method significantly differs from tariff method. In addition, high amount of indirect costs in the hospital indicates that capacities of resources are not used properly. Cost price of remedial services with tariff method is not properly calculated when compared with ABC method. ABC calculates cost price by applying suitable mechanisms but tariff method is based on the fixed price. In addition, ABC represents useful information about the amount and combination of cost price services.

  13. The Distributed Wind Cost Taxonomy

    Energy Technology Data Exchange (ETDEWEB)

    Forsyth, Trudy; Jimenez, Tony; Preus, Robert; Tegen, Suzanne; Baring-Gould, Ian

    2017-03-28

    To date, there has been no standard method or tool to analyze the installed and operational costs for distributed wind turbine systems. This report describes the development of a classification system, or taxonomy, for distributed wind turbine project costs. The taxonomy establishes a framework to help collect, sort, and compare distributed wind cost data that mirrors how the industry categorizes information. The taxonomy organizes costs so they can be aggregated from installers, developers, vendors, and other sources without losing cost details. Developing a peer-reviewed taxonomy is valuable to industry stakeholders because a common understanding the details of distributed wind turbine costs and balance of station costs is a first step to identifying potential high-value cost reduction opportunities. Addressing cost reduction potential can help increase distributed wind's competitiveness and propel the U.S. distributed wind industry forward. The taxonomy can also be used to perform cost comparisons between technologies and track trends for distributed wind industry costs in the future. As an initial application and piloting of the taxonomy, preliminary cost data were collected for projects of different sizes and from different regions across the contiguous United States. Following the methods described in this report, these data are placed into the established cost categories.

  14. The ABCs of Activity-Based Costing: A Cost Containment and Reallocation Tool.

    Science.gov (United States)

    Turk, Frederick J.

    1992-01-01

    This article describes activity-based costing (ABC) and how this tool may help management understand the costs of major activities and identify possible alternatives. Also discussed are the traditional costing systems used by higher education and ways of applying ABC to higher education. (GLR)

  15. Uranium milling costs

    International Nuclear Information System (INIS)

    Coleman, R.B.

    1980-01-01

    Basic process flowsheets are reviewed for conventional milling of US ores. Capital costs are presented for various mill capacities for one of the basic processes. Operating costs are shown for various mill capacities for all of the basic process flowsheets. The number of mills using, or planning to use, a particular process is reviewed. A summary of the estimated average milling costs for all operating US mills is shown

  16. Counting the costs of accreditation in acute care: an activity-based costing approach.

    Science.gov (United States)

    Mumford, Virginia; Greenfield, David; Hogden, Anne; Forde, Kevin; Westbrook, Johanna; Braithwaite, Jeffrey

    2015-09-08

    To assess the costs of hospital accreditation in Australia. Mixed methods design incorporating: stakeholder analysis; survey design and implementation; activity-based costs analysis; and expert panel review. Acute care hospitals accredited by the Australian Council for Health Care Standards. Six acute public hospitals across four States. Accreditation costs varied from 0.03% to 0.60% of total hospital operating costs per year, averaged across the 4-year accreditation cycle. Relatively higher costs were associated with the surveys years and with smaller facilities. At a national level these costs translate to $A36.83 million, equivalent to 0.1% of acute public hospital recurrent expenditure in the 2012 fiscal year. This is the first time accreditation costs have been independently evaluated across a wide range of hospitals and highlights the additional cost burden for smaller facilities. A better understanding of the costs allows policymakers to assess alternative accreditation and other quality improvement strategies, and understand their impact across a range of facilities. This methodology can be adapted to assess international accreditation programmes. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  17. External costs of electricity

    International Nuclear Information System (INIS)

    Rabl, A.; Spadaro, J.V.

    2005-01-01

    This article presents a synthesis of the ExternE project (External costs of Energy) of the European community about the external costs of power generation. Pollution impacts are calculated using an 'impact pathways' analysis, i.e. an analysis of the emission - dispersion - dose-response function - cost evaluation chain. Results are presented for different fuel cycles (with several technological variants) with their confidence intervals. The environmental impact costs are particularly high for coal: for instance, in France, for coal-fired power plants it is of the same order as the electricity retail price. For natural gas, this cost is about a third of the one for coal. On the contrary, the environmental impact costs for nuclear and renewable energies are low, typically of few per cent of the electricity price. The main part of these costs corresponds to the sanitary impacts, in particular the untimely mortality. In order to avoid any controversy about the cost evaluation of mortality, the reduction of the expectation of life due to the different fuel cycles is also indicated and the risks linked with nuclear energy are presented using several comparisons. (J.S.)

  18. Target costing as an element of the hard coal extraction cost planning process

    Directory of Open Access Journals (Sweden)

    Katarzyna Segeth-Boniecka

    2017-09-01

    Full Text Available Target costing as an element of the hard coal extraction cost planning process Striving for the efficiency of activities is of great significance in the management of hard coal extractive enterprises, which are constantly subjected to the process of restructuring. Effective cost management is an important condition of the increase in the efficiency of the researched business entities’ activity. One of the tools whose basic objective is conscious influencing cost levels is target costing. The aim of this article is to analyse the conditions of implementing target costing in the planning of hard coal extraction costs in hard coal mines in Poland. The subject area raises a topical and important problem of the scope of solutions concerning cost analysis in hard coal mines in Poland, which has not been thoroughly researched yet. To achieve the abovementioned aim, the theoretical works of the subject area have been referenced. The mine management process is difficult and requires the application of best suited and most modern tools, including those used in the planning process of hard coal extraction costs in order to support the economic efficiency of mining operations. The use of the target costing concept in the planning of hard coal mine operations aims to support the decision-making process, so as to achieve a specified level of economic efficiency of the operations carried out in a territorially designated site of hard coal extraction.

  19. Systems/cost summary

    International Nuclear Information System (INIS)

    Grand, P.; Danby, G.; Keane, J.; Spiro, J.; Sutter, D.; Cole, F.; Hoyer, E.; Freytag, K.; Burke, R.

    1977-01-01

    The purpose of the meeting was to discuss and develop cost-estimating methods for heavy-ion fusion accelerator systems. The group did not consider that its purpose was to make technical judgements on proposed systems, but to develop methods for making reasonable cost estimates of these systems. Such estimates will, it is hoped, provide material for systems studies, will help in guiding research and development efforts by identifying ''high-leverage'' subsystems (areas that account for a significant part of total system cost and that might be reduced in cost by further technical development) and to begin to provide data to aid in an eventual decision on the optimum type of accelerator for heavy-ion fusion

  20. A life cycle cost economics model for projects with uniformly varying operating costs. [management planning

    Science.gov (United States)

    Remer, D. S.

    1977-01-01

    A mathematical model is developed for calculating the life cycle costs for a project where the operating costs increase or decrease in a linear manner with time. The life cycle cost is shown to be a function of the investment costs, initial operating costs, operating cost gradient, project life time, interest rate for capital and salvage value. The results show that the life cycle cost for a project can be grossly underestimated (or overestimated) if the operating costs increase (or decrease) uniformly over time rather than being constant as is often assumed in project economic evaluations. The following range of variables is examined: (1) project life from 2 to 30 years; (2) interest rate from 0 to 15 percent per year; and (3) operating cost gradient from 5 to 90 percent of the initial operating costs. A numerical example plus tables and graphs is given to help calculate project life cycle costs over a wide range of variables.

  1. Acute costs and predictors of higher treatment costs of trauma in New South Wales, Australia.

    Science.gov (United States)

    Curtis, Kate; Lam, Mary; Mitchell, Rebecca; Black, Deborah; Taylor, Colman; Dickson, Cara; Jan, Stephen; Palmer, Cameron S; Langcake, Mary; Myburgh, John

    2014-01-01

    Accurate economic data are fundamental for improving current funding models and ultimately in promoting the efficient delivery of services. The financial burden of a high trauma casemix to designated trauma centres in Australia has not been previously determined, and there is some evidence that the episode funding model used in Australia results in the underfunding of trauma. To describe the costs of acute trauma admissions in trauma centres, identify predictors of higher treatment costs and cost variance in New South Wales (NSW), Australia. Data linkage of admitted trauma patient and financial data provided by 12 Level 1 NSW trauma centres for the 08/09 financial year was performed. Demographic, injury details and injury scores were obtained from trauma registries. Individual patient general ledger costs (actual trauma patient costs), Australian Refined Diagnostic Related Groups (AR-DRG) and state-wide average costs (which form the basis of funding) were obtained. The actual costs incurred by the hospital were then compared with the state-wide AR-DRG average costs. Multivariable multiple linear regression was used for identifying predictors of costs. There were 17,522 patients, the average per patient cost was $10,603 and the median was $4628 (interquartile range: $2179-10,148). The actual costs incurred by trauma centres were on average $134 per bed day above AR-DRG costs-determined costs. Falls, road trauma and violence were the highest causes of total cost. Motor cyclists and pedestrians had higher median costs than motor vehicle occupants. As a result of greater numbers, patients with minor injury had comparable total costs with those generated by patients with severe injury. However the median cost of severely injured patients was nearly four times greater. The count of body regions injured, sex, length of stay, serious traumatic brain injury and admission to the Intensive Care Unit were significantly associated with increased costs (p<0.001). This

  2. The cost of electrocoagulation

    Energy Technology Data Exchange (ETDEWEB)

    Donini, J.C.; Kan, J.; Szynkarczuk, J.; Hassan, T.A.; Kar, K.L.

    1993-01-01

    Electrocoagulation could be an attractive and suitable method for separating solids from waste water. The electrocoagulation of kaolinite and bentonite suspensions was studied in a pilot electrocoagulation unit to assess the cost and efficiency of the process. Factors affecting cost such as the formation of passivation layers on electrode plates and the recirculation and concentration of sodium chloride were examined. Colorimetry was used to analyze aluminum content in the suspension. The results were used to calculate the cost due to consumption of electrode material (aluminium) during the process. Total cost was assumed to comprise the energy cost and the cost of electrode material. Comparison was based on the settling properties of the treated product: turbidity, settling rate, and cake height. In most cases, aluminium efficiency averaged around 200% and material cost accounted for 80% of total cost. Although higher concentrations of sodium chloride could only slightly increase aluminium efficiency and electrode efficiency, the higher concentrations resulted in much greater total cost, due to the greater current generated by the increased suspension conductivity, which in turn dissolved a larger amount of aluminium. The recirculation loop increased the flow rate by 3-10 times, enhancing the mass transport between the electrodes and resulting in lower cost and better settling properties. Over the course of two months the electrodes coatings became thicker while efficiency decreased. The electrode efficiency was found to be as high as 94% for virgin electrodes and as low as 10% after two months. 8 refs., 25 figs., 9 tabs.

  3. 14 CFR 1260.72 - Adherence to original budget estimates.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Adherence to original budget estimates... COOPERATIVE AGREEMENTS General Post-Award Requirements § 1260.72 Adherence to original budget estimates. (a) Although NASA assumes no responsibility for budget overruns, the recipient may spend grant funds without...

  4. Management of End-Stage Ankle Arthritis: Cost-Utility Analysis Using Direct and Indirect Costs.

    Science.gov (United States)

    Nwachukwu, Benedict U; McLawhorn, Alexander S; Simon, Matthew S; Hamid, Kamran S; Demetracopoulos, Constantine A; Deland, Jonathan T; Ellis, Scott J

    2015-07-15

    Total ankle replacement and ankle fusion are costly but clinically effective treatments for ankle arthritis. Prior cost-effectiveness analyses for the management of ankle arthritis have been limited by a lack of consideration of indirect costs and nonoperative management. The purpose of this study was to compare the cost-effectiveness of operative and nonoperative treatments for ankle arthritis with inclusion of direct and indirect costs in the analysis. Markov model analysis was conducted from a health-systems perspective with use of direct costs and from a societal perspective with use of direct and indirect costs. Costs were derived from the 2012 Nationwide Inpatient Sample (NIS) and expressed in 2013 U.S. dollars; effectiveness was expressed in quality-adjusted life years (QALYs). Model transition probabilities were derived from the available literature. The principal outcome measure was the incremental cost-effectiveness ratio (ICER). In the direct-cost analysis for the base case, total ankle replacement was associated with an ICER of $14,500/QALY compared with nonoperative management. When indirect costs were included, total ankle replacement was both more effective and resulted in $5900 and $800 in lifetime cost savings compared with the lifetime costs following nonoperative management and ankle fusion, respectively. At a $100,000/QALY threshold, surgical management of ankle arthritis was preferred for patients younger than ninety-six years and total ankle replacement was increasingly more cost-effective in younger patients. Total ankle replacement, ankle fusion, and nonoperative management were the preferred strategy in 83%, 12%, and 5% of the analyses, respectively; however, our model was sensitive to patient age, the direct costs of total ankle replacement, the failure rate of total ankle replacement, and the probability of arthritis after ankle fusion. Compared with nonoperative treatment for the management of end-stage ankle arthritis, total ankle

  5. From cost survey to « cost killing » on ASTRID Fast Reactor

    International Nuclear Information System (INIS)

    Vernhet, Didier

    2013-01-01

    Conclusions: • Due to the different level of readiness for each equipement, we found a wide scale of elementary costs. • We have no industrial reference (except SuperPhenix – ‘80s) and the approach of actual cost can be with a important uncertainty margin. • It is not easy to measure: ⇒ the impact of increasing rules and regulation; ⇒ the loss of know-how of manufacturers. • The appreciation of the risks for this type of innovative prototype and corresponding cost allowances is very complex. • These various estimating processes led to a range for a first evaluation of the construction cost of ASTRID, but still with large bias and uncertainties given the design stage of the project. • The analysis of the elementary value are a great imput data for an efficiency « Cost Killing » approach. • The wide range of cost approach can give us some new supports for the selection of each further design, during the 2 next years

  6. Do Medicare Advantage Plans Minimize Costs? Investigating the Relationship Between Benchmarks, Costs, and Rebates.

    Science.gov (United States)

    Zuckerman, Stephen; Skopec, Laura; Guterman, Stuart

    2017-12-01

    Medicare Advantage (MA), the program that allows people to receive their Medicare benefits through private health plans, uses a benchmark-and-bidding system to induce plans to provide benefits at lower costs. However, prior research suggests medical costs, profits, and other plan costs are not as low under this system as they might otherwise be. To examine how well the current system encourages MA plans to bid their lowest cost by examining the relationship between costs and bonuses (rebates) and the benchmarks Medicare uses in determining plan payments. Regression analysis using 2015 data for HMO and local PPO plans. Costs and rebates are higher for MA plans in areas with higher benchmarks, and plan costs vary less than benchmarks do. A one-dollar increase in benchmarks is associated with 32-cent-higher plan costs and a 52-cent-higher rebate, even when controlling for market and plan factors that can affect costs. This suggests the current benchmark-and-bidding system allows plans to bid higher than local input prices and other market conditions would seem to warrant. To incentivize MA plans to maximize efficiency and minimize costs, Medicare could change the way benchmarks are set or used.

  7. Cost incentives for doctors

    DEFF Research Database (Denmark)

    Schottmüller, Christoph

    2013-01-01

    If doctors take the costs of treatment into account when prescribing medication, their objectives differ from their patients' objectives because the patients are insured. This misalignment of interests hampers communication between patient and doctor. Giving cost incentives to doctors increases...... welfare if (i) the doctor's examination technology is sufficiently good or (ii) (marginal) costs of treatment are high enough. If the planner can costlessly choose the extent to which doctors take costs into account, he will opt for less than 100%. Optimal health care systems should implement different...... degrees of cost incentives depending on type of disease and/or doctor....

  8. Costs of stroke and stroke services: Determinants of patient costs and a comparison of costs of regular care and care organised in stroke services

    Directory of Open Access Journals (Sweden)

    Koopmanschap Marc A

    2003-02-01

    Full Text Available Abstract Background Stroke is a major cause of death and long-term disability in Western societies and constitutes a major claim on health care budgets. Organising stroke care in a stroke service has recently been demonstrated to result in better health effects for patients. This paper discusses patient costs after stroke and compares costs between regular and stroke service care. Methods Costs were calculated within the framework of the evaluation of three experiments with stroke services in the Netherlands. Cost calculations are base on medical consumption data and actual costs. Results 598 patients were consecutively admitted to hospital after stroke. The average total costs of care per patient for the 6 month follow-up are estimated at €16,000. Costs are dominated by institutional and accommodation costs. Patients who die after stroke incur less costs. For patients that survive the acute phase, the most important determinants of costs are disability status and having a partner – as they influence patients' stroke careers. These determinants also interact. The most efficient stroke service experiment was most successful in co-ordinating patient flow from hospital to (nursing home, through capacity planning and efficient discharge procedures. In this region the costs of stroke service care are the same as for regular stroke care. The other experiments suffered from waiting lists for nursing homes and home care, leading to "blocked beds" in hospitals and nursing homes and higher costs of care. Costs of co-ordination are estimated at about 3% of total costs of care. Conclusion This paper demonstrates that by organising care for stroke patients in a stroke service, better health effects can be achieved with the same budget. In addition, it provides insight in need, predisposing and enabling factors that determine costs of care after stroke.

  9. Advanced Fuel Cycle Cost Basis

    Energy Technology Data Exchange (ETDEWEB)

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

    2009-12-01

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

  10. Advanced Fuel Cycle Cost Basis

    Energy Technology Data Exchange (ETDEWEB)

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert

    2007-04-01

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 26 cost modules—24 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, and high-level waste.

  11. Advanced Fuel Cycle Cost Basis

    Energy Technology Data Exchange (ETDEWEB)

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

    2008-03-01

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

  12. Cost Accounting as a Tool for Increasing Cost Transparency in Selective Hepatic Transarterial Chemoembolization.

    Science.gov (United States)

    Ahmed, Osman; Patel, Mikin; Ward, Thomas; Sze, Daniel Y; Telischak, Kristen; Kothary, Nishita; Hofmann, Lawrence V

    2015-12-01

    To increase cost transparency and uncover potential areas for savings in patients receiving selective transarterial chemoembolization at a tertiary care academic center. The hospital cost accounting system charge master sheet for direct and total costs associated with selective transarterial chemoembolization in fiscal years 2013 and 2014 was queried for each of the four highest volume interventional radiologists at a single institution. There were 517 cases (range, 83-150 per physician) performed; direct costs incurred relating to care before, during, and after the procedure with respect to labor, supply, and equipment fees were calculated. A median of 48 activity codes were charged per selective transarterial chemoembolization from five cost centers, represented by the angiography suite, units for care before and after the procedure, pharmacy, and observation floors. The average direct cost of selective transarterial chemoembolization did not significantly differ among operators at $9,126.94, $8,768.77, $9,027.33, and $8,909.75 (P = .31). Intraprocedural costs accounted for 82.8% of total direct costs and provided the greatest degree in cost variability ($7,268.47-$7,691.27). The differences in intraprocedural expense among providers were not statistically significant (P = .09), even when separated into more specific procedure-related labor and supply costs. Cost accounting systems could effectively be interrogated as a method for calculating direct costs associated with selective transarterial chemoembolization. The greatest source of expenditure and variability in cost among providers was shown to be intraprocedural labor and supplies, although the effect did not appear to be operator dependent. Copyright © 2015 SIR. Published by Elsevier Inc. All rights reserved.

  13. Stranded costs and exit fees

    International Nuclear Information System (INIS)

    2002-01-01

    The New Brunswick Market Design Committee has been directed to examine the issue of stranded costs since it is a major component of restructuring within the electricity sector. When regulated monopolies are faced with competition, they could find that some of their embedded costs cannot be recovered. These costs are referred to as stranded costs. Common sources include large capital investments in uneconomic plants or expensive power purchase contracts or fuel supply contracts. In general, stranded costs do not include gains or losses associated with normal business risks experienced by regulated utilities. This report presents recommendations for mitigation of stranded costs, valuation methodologies and cost-recovery mechanisms. It also presents a summary of experience with stranded costs in other jurisdictions such as California, Rhode Island, Pennsylvania and Ontario. Stranded costs are often recovered through an obligatory charge on all customers, particularly in jurisdictions where retail competition exists. In the New Brunswick market, however, the only customers who can create stranded costs are those eligible to choose their own suppliers. It is argued that since most customers will not have a choice of electricity suppliers, they cannot generate stranded costs and therefore, should not have to pay costs stranded by others. A method to quantify stranded costs is presented, along with a review of transmission-related stranded costs in New Brunswick. Expansion of self-generation in New Brunswick could strand transmission assets. Currently, self-generators only contribute a small amount to fixed charges of the transmission system. However, under new recommended tariffs, the amount could increase. It is likely that the net amount of stranded transmission costs will not be large. 2 refs., 1 fig

  14. Costing bias in economic evaluations.

    Science.gov (United States)

    Frappier, Julie; Tremblay, Gabriel; Charny, Mark; Cloutier, L Martin

    2015-01-01

    Determining the cost-effectiveness of healthcare interventions is key to the decision-making process in healthcare. Cost comparisons are used to demonstrate the economic value of treatment options, to evaluate the impact on the insurer budget, and are often used as a key criterion in treatment comparison and comparative effectiveness; however, little guidance is available to researchers for establishing the costing of clinical events and resource utilization. Different costing methods exist, and the choice of underlying assumptions appears to have a significant impact on the results of the costing analysis. This editorial describes the importance of the choice of the costing technique and it's potential impact on the relative cost of treatment options. This editorial also calls for a more efficient approach to healthcare intervention costing in order to ensure the use of consistent costing in the decision-making process.

  15. Socio-economic costs of osteoarthritis: a systematic review of cost-of-illness studies.

    Science.gov (United States)

    Puig-Junoy, Jaume; Ruiz Zamora, Alba

    2015-04-01

    The burden of illness that can be attributed to osteoarthritis is considerable and ever increasing. The aim of this systematic review is to analyze currently available data derived from cost-of-illness studies on the healthcare and non-healthcare costs of osteoarthritis. PubMed, Index Medicus Español (IME), and the Spanish Database of Health Sciences [Índice Bibliográfico Español en Ciencias de la Salud (IBECS)] were searched up to the end of April 2013. This study adhered to the PRISMA guidelines. Articles were reviewed and the study quality assessed by two independent investigators with consensus resolution of discrepancies. We identified 39 studies that investigated the socio-economic cost of osteoarthritis. Only nine studies took a social perspective. Rather than estimating the incremental cost of osteoarthritis, nine studies estimated the total cost of treating patients with osteoarthritis without a control for comorbidity. The other 30 studies determined the incremental cost with or without a control group. Only nine studies assessed a comprehensive list of healthcare resources. The annual incremental healthcare costs of generalized osteoarthritis ranged from €705 to €19,715. The annual incremental non-healthcare-related costs of generalized osteoarthritis ranged from €432 to €11,956. The study concludes that the social cost of osteoarthritis could be between 0.25% and 0.50% of a country׳s GDP. This should be considered in order to foster studies that take into account both healthcare and non-healthcare costs. Copyright © 2014 Elsevier Inc. All rights reserved.

  16. Medicare Cost Reports

    Data.gov (United States)

    U.S. Department of Health & Human Services — Medicare certified institutional providers are required to submit an annual cost report to a Medicare Administrative Contractor. The cost report contains provider...

  17. 40 CFR 791.50 - Costs.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Costs. 791.50 Section 791.50 Protection...) DATA REIMBURSEMENT Basis for Proposed Order § 791.50 Costs. (a) All costs reasonable and necessary to... tests, are eligible for reimbursement. Necessary costs include: (1) Direct and indirect costs of...

  18. 24 CFR 208.112 - Cost.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Cost. 208.112 Section 208.112... MULTIFAMILY SUBSIDIZED PROJECTS § 208.112 Cost. (a) The costs of the electronic transmission of the correctly... cost of contracting for those services, or the cost of centralizing the electronic transmission...

  19. New Federal Cost Accounting Regulations

    Science.gov (United States)

    Wolff, George J.; Handzo, Joseph J.

    1973-01-01

    Discusses a new set of indirect cost accounting procedures which must be followed by school districts wishing to recover any indirect costs of administering federal grants and contracts. Also discusses the amount of indirect costs that may be recovered, computing indirect costs, classifying project costs, and restricted grants. (Author/DN)

  20. A Departmental Cost-Effectiveness Model.

    Science.gov (United States)

    Holleman, Thomas, Jr.

    In establishing a departmental cost-effectiveness model, the traditional cost-effectiveness model was discussed and equipped with a distant and deflation equation for both benefits and costs. Next, the economics of costing was examined and program costing procedures developed. Then, the model construct was described as it was structured around the…

  1. [Socioeconomic costs of food-borne disease using the cost-of-illness model: applying the QALY method].

    Science.gov (United States)

    Shin, Hosung; Lee, Suehyung; Kim, Jong Soo; Kim, Jinsuk; Han, Kyu Hong

    2010-07-01

    This study estimated the annual socioeconomic costs of food-borne disease in 2008 from a societal perspective and using a cost-of-illness method. Our model employed a comprehensive set of diagnostic disease codes to define food-borne diseases with using the Korea National Health Insurance (KNHI) reimbursement data. This study classified the food borne illness as three types of symptoms according to the severity of the illness: mild, moderate, severe. In addition to the traditional method of assessing the cost-of-illness, the study included measures to account for the lost quality of life. We estimated the cost of the lost quality of life using quality-adjusted life years and a visual analog scale. The direct cost included medical and medication costs, and the non-medical costs included transportation costs, caregiver's cost and administration costs. The lost productivity costs included lost workdays due to illness and lost earnings due to premature death. The study found the estimated annual socioeconomic costs of food-borne disease in 2008 were 954.9 billion won (735.3 billion won-996.9 billion won). The medical cost was 73.4 - 76.8% of the cost, the lost productivity cost was 22.6% and the cost of the lost quality of life was 26.0%. Most of the cost-of-illness studies are known to have underestimated the actual socioeconomic costs of the subjects, and these studies excluded many important social costs, such as the value of pain, suffering and functional disability. The study addressed the uncertainty related to estimating the socioeconomic costs of food-borne disease as well as the updated cost estimates. Our estimates could contribute to develop and evaluate policies for food-borne disease.

  2. The Cost of Astronomy

    DEFF Research Database (Denmark)

    Dorch, Bertil F.

    Using Scopus and national sources, I have investigated the evolution of the cost of publishing in Danish astronomy on a fine scale over a number of years. I find that the number of publications per year from Danish astronomers increased by a factor of four during 15 years: naturally, the correspo......Using Scopus and national sources, I have investigated the evolution of the cost of publishing in Danish astronomy on a fine scale over a number of years. I find that the number of publications per year from Danish astronomers increased by a factor of four during 15 years: naturally......, the corresponding potential cost of publishing must have increased similarly. The actual realized cost of publishing in core journals are investigated for a high profile Danish astronomy research institutions. I argue that the situation is highly unstable if the current cost scenario continues, and I speculate...... that Danish astronomy is risking a scholarly communication collapse due to the combination of increasing subscription cost, increased research output, and increased direct publishing costs related to Open access and other page charges....

  3. The future cost of cancer in South Africa: An interdisciplinary cost management strategy.

    Science.gov (United States)

    Sartorius, K; Sartorius, B; Govender, P S; Sharma, V; Sherriff, A

    2016-09-06

    The exponential rise in cancer costs in South Africa (SA) was illustrated in a recent Sunday Times article entitled 'The cost of cancer can be a debt sentence'. Our Minister of Health talks of a 'war' against the high costs of cancer drugs, and epidemiologists project a sharply rising incidence. Eminent international medical journals, such as The Lancet, underline the fact that cancer cost is a growing international problem that confronts even the richest countries. If richer countries in the world are battling to cover the costs of cancer, what is the prognosis for SA?

  4. Applied cost allocation

    DEFF Research Database (Denmark)

    Bogetoft, Peter; Hougaard, Jens Leth; Smilgins, Aleksandrs

    2016-01-01

    This paper deals with empirical computation of Aumann–Shapley cost shares for joint production. We show that if one uses a mathematical programing approach with its non-parametric estimation of the cost function there may be observations in the data set for which we have multiple Aumann–Shapley p...... of assumptions concerning firm behavior. These assumptions enable us to connect inefficient with efficient production and thereby provide consistent ways of allocating the costs arising from inefficiency....

  5. Costs of traffic injuries

    DEFF Research Database (Denmark)

    Kruse, Marie

    2015-01-01

    assessed using Danish national healthcare registers. Productivity costs were computed using duration analysis (Cox regression models). In a subanalysis, cost per severe traffic injury was computed for the 12 995 individuals that experienced a severe injury. RESULTS: The socioeconomic cost of a traffic...... injury was €1406 (2009 price level) in the first year, and €8950 over a 10-year period. Per 100 000 population, the 10-year cost was €6 565 668. A severe traffic injury costs €4969 per person in the first year, and €4 006 685 per 100 000 population over a 10-year period. Victims of traffic injuries...

  6. 24 CFR 908.108 - Cost.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Cost. 908.108 Section 908.108..., RENTAL VOUCHER, AND MODERATE REHABILITATION PROGRAMS § 908.108 Cost. (a) General. The costs of the... computer hardware or software, or both, the cost of contracting for those services, or the cost of...

  7. INTOR cost approximation

    International Nuclear Information System (INIS)

    Knobloch, A.F.

    1980-01-01

    A simplified cost approximation for INTOR parameter sets in a narrow parameter range is shown. Plausible constraints permit the evaluation of the consequences of parameter variations on overall cost. (orig.) [de

  8. Learning Together; part 2: training costs and health gain - a cost analysis.

    Science.gov (United States)

    Cullen, Katherine; Riches, Wendy; Macaulay, Chloe; Spicer, John

    2017-01-01

    Learning Together is a complex educational intervention aimed at improving health outcomes for children and young people. There is an additional cost as two doctors are seeing patients together for a longer appointment than a standard general practice (GP) appointment. Our approach combines the impact of the training clinics on activity in South London in 2014-15 with health gain, using NICE guidance and standards to allow comparison of training options. Activity data was collected from Training Practices hosting Learning Together. A computer based model was developed to analyse the costs of the Learning Together intervention compared to usual training in a partial economic evaluation. The results of the model were used to value the health gain required to make the intervention cost effective. Data were returned for 363 patients booked into 61 clinics across 16 Training Practices. Learning Together clinics resulted in an increase in costs of £37 per clinic. Threshold analysis illustrated one child with a common illness like constipation needs to be well for two weeks, in one Practice hosting four training clinics for the clinics to be considered cost effective. Learning Together is of minimal training cost. Our threshold analysis produced a rubric that can be used locally to test cost effectiveness at a Practice or Programme level.

  9. Treatment Cost Analysis Tool (TCAT) for estimating costs of outpatient treatment services.

    Science.gov (United States)

    Flynn, Patrick M; Broome, Kirk M; Beaston-Blaakman, Aaron; Knight, Danica K; Horgan, Constance M; Shepard, Donald S

    2009-02-01

    A Microsoft Excel-based workbook designed for research analysts to use in a national study was retooled for treatment program directors and financial officers to allocate, analyze, and estimate outpatient treatment costs in the U.S. This instrument can also be used as a planning and management tool to optimize resources and forecast the impact of future changes in staffing, client flow, program design, and other resources. The Treatment Cost Analysis Tool (TCAT) automatically provides feedback and generates summaries and charts using comparative data from a national sample of non-methadone outpatient providers. TCAT is being used by program staff to capture and allocate both economic and accounting costs, and outpatient service costs are reported for a sample of 70 programs. Costs for an episode of treatment in regular, intensive, and mixed types of outpatient treatment were $882, $1310, and $1381 respectively (based on 20% trimmed means and 2006 dollars). An hour of counseling cost $64 in regular, $85 intensive, and $86 mixed. Group counseling hourly costs per client were $8, $11, and $10 respectively for regular, intensive, and mixed. Future directions include use of a web-based interview version, much like some of the commercially available tax preparation software tools, and extensions for use in other modalities of treatment.

  10. Melanoma costs: a dynamic model comparing estimated overall costs of various clinical stages.

    Science.gov (United States)

    Alexandrescu, Doru Traian

    2009-11-15

    The rapidly increasing incidence of melanoma occurs at the same time as an increase in general healthcare costs, particularly the expenses associated with cancer care. Previous cost estimates in melanoma have not utilized a dynamic model considering the evolution of the disease and have not integrated the multiple costs associated with different aspects of medical interventions and patient-related factors. Futhermore, previous calculations have not been updated to reflect the modern tendencies in healthcare costs. We designed a comprehensive model of expenses in melanoma that considers the dynamic costs generated by the natural progression of the disease, which produces costs associated with treatment, surveillance, loss of income, and terminal care. The complete range of initial clinical (TNM) stages of the disease and initial tumor stages were analyzed in this model and the total healthcare costs for the five years following melanoma presentation at each particular stage were calculated. We have observed dramatic incremental total costs associated with progressively higher initial stages of the disease, ranging from a total of $4,648.48 for in situ tumors to $159,808.17 for Stage IV melanoma. By stage, early lesions associate 30-55 percent of their costs for the treatment of the primary tumor, due to a low rate of recurrence (local, regional, or distant), which limits the need for additional interventions. For in situ melanoma, T1a, and T1b, surveillance is an important contributor to the medical costs, accounting for more than 25 percent of the total cost over 5 years. In contrast, late lesions incur a much larger proportion of their associated costs (up to 80-85%) from the diagnosis and treatment of metastatic disease because of the increased propensity of those lesions to disseminate. This cost increases with increasing tumor stage (from $2,442.17 for T1a to $6,678.00 for T4b). The most expensive items in the medical care of patients with melanoma consist of

  11. Clinical benefits, costs, and cost-effectiveness of neonatal intensive care in Mexico.

    Directory of Open Access Journals (Sweden)

    Jochen Profit

    2010-12-01

    Full Text Available Neonatal intensive care improves survival, but is associated with high costs and disability amongst survivors. Recent health reform in Mexico launched a new subsidized insurance program, necessitating informed choices on the different interventions that might be covered by the program, including neonatal intensive care. The purpose of this study was to estimate the clinical outcomes, costs, and cost-effectiveness of neonatal intensive care in Mexico.A cost-effectiveness analysis was conducted using a decision analytic model of health and economic outcomes following preterm birth. Model parameters governing health outcomes were estimated from Mexican vital registration and hospital discharge databases, supplemented with meta-analyses and systematic reviews from the published literature. Costs were estimated on the basis of data provided by the Ministry of Health in Mexico and World Health Organization price lists, supplemented with published studies from other countries as needed. The model estimated changes in clinical outcomes, life expectancy, disability-free life expectancy, lifetime costs, disability-adjusted life years (DALYs, and incremental cost-effectiveness ratios (ICERs for neonatal intensive care compared to no intensive care. Uncertainty around the results was characterized using one-way sensitivity analyses and a multivariate probabilistic sensitivity analysis. In the base-case analysis, neonatal intensive care for infants born at 24-26, 27-29, and 30-33 weeks gestational age prolonged life expectancy by 28, 43, and 34 years and averted 9, 15, and 12 DALYs, at incremental costs per infant of US$11,400, US$9,500, and US$3,000, respectively, compared to an alternative of no intensive care. The ICERs of neonatal intensive care at 24-26, 27-29, and 30-33 weeks were US$1,200, US$650, and US$240, per DALY averted, respectively. The findings were robust to variation in parameter values over wide ranges in sensitivity analyses

  12. Costs of diarrheal disease and the cost-effectiveness of a rotavirus vaccination program in kyrgyzstan.

    Science.gov (United States)

    Flem, Elmira T; Latipov, Renat; Nurmatov, Zuridin S; Xue, Yiting; Kasymbekova, Kaliya T; Rheingans, Richard D

    2009-11-01

    We examined the cost-effectiveness of a rotavirus immunization program in Kyrgyzstan, a country eligible for vaccine funding from the GAVI Alliance. We estimated the burden of rotavirus disease and its economic consequences by using national and international data. A cost-effectiveness analysis was conducted from government and societal perspectives, along with a range of 1-way sensitivity analyses. Rotavirus-related hospitalizations and outpatient visits cost US$580,864 annually, of which $421,658 (73%) is direct medical costs and $159,206 (27%) is nonmedical and indirect costs. With 95% coverage, vaccination could prevent 75% of rotavirus-related hospitalizations and deaths and 56% of outpatient visits and could avert $386,193 (66%) in total costs annually. The medical break-even price at which averted direct medical costs equal vaccination costs is $0.65/dose; the societal break-even price is $1.14/dose for a 2-dose regimen. At the current GAVI Alliance-subsidized vaccine price of $0.60/course, rotavirus vaccination is cost-saving for the government. Vaccination is cost-effective at a vaccine price $9.41/dose, according to the cost-effectiveness standard set by the 2002 World Health Report. Addition of rotavirus vaccines to childhood immunization in Kyrgyzstan could substantially reduce disease burden and associated costs. Vaccination would be cost-effective from the national perspective at a vaccine price $9.41 per dose.

  13. Accounting for the relationship between per diem cost and LOS when estimating hospitalization costs.

    Science.gov (United States)

    Ishak, K Jack; Stolar, Marilyn; Hu, Ming-yi; Alvarez, Piedad; Wang, Yamei; Getsios, Denis; Williams, Gregory C

    2012-12-01

    Hospitalization costs in clinical trials are typically derived by multiplying the length of stay (LOS) by an average per-diem (PD) cost from external sources. This assumes that PD costs are independent of LOS. Resource utilization in early days of the stay is usually more intense, however, and thus, the PD cost for a short hospitalization may be higher than for longer stays. The shape of this relationship is unlikely to be linear, as PD costs would be expected to gradually plateau. This paper describes how to model the relationship between PD cost and LOS using flexible statistical modelling techniques. An example based on a clinical study of clevidipine for the treatment of peri-operative hypertension during hospitalizations for cardiac surgery is used to illustrate how inferences about cost-savings associated with good blood pressure (BP) control during the stay can be affected by the approach used to derive hospitalization costs.Data on the cost and LOS of hospitalizations for coronary artery bypass grafting (CABG) from the Massachusetts Acute Hospital Case Mix Database (the MA Case Mix Database) were analyzed to link LOS to PD cost, factoring in complications that may have occurred during the hospitalization or post-discharge. The shape of the relationship between LOS and PD costs in the MA Case Mix was explored graphically in a regression framework. A series of statistical models including those based on simple logarithmic transformation of LOS to more flexible models using LOcally wEighted Scatterplot Smoothing (LOESS) techniques were considered. A final model was selected, using simplicity and parsimony as guiding principles in addition traditional fit statistics (like Akaike's Information Criterion, or AIC). This mapping was applied in ECLIPSE to predict an LOS-specific PD cost, and then a total cost of hospitalization. These were then compared for patients who had good vs. poor peri-operative blood-pressure control. The MA Case Mix dataset included data

  14. Accounting for the relationship between per diem cost and LOS when estimating hospitalization costs

    Directory of Open Access Journals (Sweden)

    Ishak K

    2012-12-01

    Full Text Available Abstract Background Hospitalization costs in clinical trials are typically derived by multiplying the length of stay (LOS by an average per-diem (PD cost from external sources. This assumes that PD costs are independent of LOS. Resource utilization in early days of the stay is usually more intense, however, and thus, the PD cost for a short hospitalization may be higher than for longer stays. The shape of this relationship is unlikely to be linear, as PD costs would be expected to gradually plateau. This paper describes how to model the relationship between PD cost and LOS using flexible statistical modelling techniques. Methods An example based on a clinical study of clevidipine for the treatment of peri-operative hypertension during hospitalizations for cardiac surgery is used to illustrate how inferences about cost-savings associated with good blood pressure (BP control during the stay can be affected by the approach used to derive hospitalization costs. Data on the cost and LOS of hospitalizations for coronary artery bypass grafting (CABG from the Massachusetts Acute Hospital Case Mix Database (the MA Case Mix Database were analyzed to link LOS to PD cost, factoring in complications that may have occurred during the hospitalization or post-discharge. The shape of the relationship between LOS and PD costs in the MA Case Mix was explored graphically in a regression framework. A series of statistical models including those based on simple logarithmic transformation of LOS to more flexible models using LOcally wEighted Scatterplot Smoothing (LOESS techniques were considered. A final model was selected, using simplicity and parsimony as guiding principles in addition traditional fit statistics (like Akaike’s Information Criterion, or AIC. This mapping was applied in ECLIPSE to predict an LOS-specific PD cost, and then a total cost of hospitalization. These were then compared for patients who had good vs. poor peri-operative blood

  15. Proposed Reliability/Cost Model

    Science.gov (United States)

    Delionback, L. M.

    1982-01-01

    New technique estimates cost of improvement in reliability for complex system. Model format/approach is dependent upon use of subsystem cost-estimating relationships (CER's) in devising cost-effective policy. Proposed methodology should have application in broad range of engineering management decisions.

  16. 29 CFR 4221.10 - Costs.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Costs. 4221.10 Section 4221.10 Labor Regulations Relating... PLANS ARBITRATION OF DISPUTES IN MULTIEMPLOYER PLANS § 4221.10 Costs. The costs of arbitration under... the costs of its own witnesses. (b) Other costs of arbitration. Except as provided in § 4221.6(d) with...

  17. 48 CFR 49.603-3 - Cost-reimbursement contracts-complete termination, if settlement includes cost.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-reimbursement... Termination Forms and Formats 49.603-3 Cost-reimbursement contracts—complete termination, if settlement includes cost. [Insert the following in Block 14 of SF 30 for settlement of cost-reimbursement contracts...

  18. Establishment of reference costs for occupational health services and implementation of cost management in Japanese manufacturing companies.

    Science.gov (United States)

    Nagata, Tomohisa; Mori, Koji; Aratake, Yutaka; Ide, Hiroshi; Nobori, Junichiro; Kojima, Reiko; Odagami, Kiminori; Kato, Anna; Hiraoka, Mika; Shiota, Naoki; Kobayashi, Yuichi; Ito, Masato; Tsutsumi, Akizumi; Matsuda, Shinya

    2016-07-22

    We developed a standardized cost estimation method for occupational health (OH) services. The purpose of this study was to set reference OH services costs and to conduct OH services cost management assessments in two workplaces by comparing actual OH services costs with the reference costs. Data were obtained from retrospective analyses of OH services costs regarding 15 OH activities over a 1-year period in three manufacturing workplaces. We set the reference OH services costs in one of the three locations and compared OH services costs of each of the two other workplaces with the reference costs. The total reference OH services cost was 176,654 Japanese yen (JPY) per employee. The personnel cost for OH staff to conduct OH services was JPY 47,993, and the personnel cost for non-OH staff was JPY 38,699. The personnel cost for receipt of OH services-opportunity cost-was JPY 19,747, expense was JPY 25,512, depreciation expense was 34,849, and outsourcing cost was JPY 9,854. We compared actual OH services costs from two workplaces (the total OH services costs were JPY 182,151 and JPY 238,023) with the reference costs according to OH activity. The actual costs were different from the reference costs, especially in the case of personnel cost for non-OH staff, expense, and depreciation expense. Using our cost estimation tool, it is helpful to compare actual OH services cost data with reference cost data. The outcomes help employers make informed decisions regarding investment in OH services.

  19. Solid rocket motor cost model

    Science.gov (United States)

    Harney, A. G.; Raphael, L.; Warren, S.; Yakura, J. K.

    1972-01-01

    A systematic and standardized procedure for estimating life cycle costs of solid rocket motor booster configurations. The model consists of clearly defined cost categories and appropriate cost equations in which cost is related to program and hardware parameters. Cost estimating relationships are generally based on analogous experience. In this model the experience drawn on is from estimates prepared by the study contractors. Contractors' estimates are derived by means of engineering estimates for some predetermined level of detail of the SRM hardware and program functions of the system life cycle. This method is frequently referred to as bottom-up. A parametric cost analysis is a useful technique when rapid estimates are required. This is particularly true during the planning stages of a system when hardware designs and program definition are conceptual and constantly changing as the selection process, which includes cost comparisons or trade-offs, is performed. The use of cost estimating relationships also facilitates the performance of cost sensitivity studies in which relative and comparable cost comparisons are significant.

  20. Cost and cost-effectiveness of tuberculosis treatment shortening: a model-based analysis.

    Science.gov (United States)

    Gomez, G B; Dowdy, D W; Bastos, M L; Zwerling, A; Sweeney, S; Foster, N; Trajman, A; Islam, M A; Kapiga, S; Sinanovic, E; Knight, G M; White, R G; Wells, W A; Cobelens, F G; Vassall, A

    2016-12-01

    Despite improvements in treatment success rates for tuberculosis (TB), current six-month regimen duration remains a challenge for many National TB Programmes, health systems, and patients. There is increasing investment in the development of shortened regimens with a number of candidates in phase 3 trials. We developed an individual-based decision analytic model to assess the cost-effectiveness of a hypothetical four-month regimen for first-line treatment of TB, assuming non-inferiority to current regimens of six-month duration. The model was populated using extensive, empirically-collected data to estimate the economic impact on both health systems and patients of regimen shortening for first-line TB treatment in South Africa, Brazil, Bangladesh, and Tanzania. We explicitly considered 'real world' constraints such as sub-optimal guideline adherence. From a societal perspective, a shortened regimen, priced at USD1 per day, could be a cost-saving option in South Africa, Brazil, and Tanzania, but would not be cost-effective in Bangladesh when compared to one gross domestic product (GDP) per capita. Incorporating 'real world' constraints reduces cost-effectiveness. Patient-incurred costs could be reduced in all settings. From a health service perspective, increased drug costs need to be balanced against decreased delivery costs. The new regimen would remain a cost-effective option, when compared to each countries' GDP per capita, even if new drugs cost up to USD7.5 and USD53.8 per day in South Africa and Brazil; this threshold was above USD1 in Tanzania and under USD1 in Bangladesh. Reducing the duration of first-line TB treatment has the potential for substantial economic gains from a patient perspective. The potential economic gains for health services may also be important, but will be context-specific and dependent on the appropriate pricing of any new regimen.

  1. Evaluating the administration costs of biologic drugs: development of a cost algorithm.

    Science.gov (United States)

    Tetteh, Ebenezer K; Morris, Stephen

    2014-12-01

    Biologic drugs, as with all other medical technologies, are subject to a number of regulatory, marketing, reimbursement (financing) and other demand-restricting hurdles applied by healthcare payers. One example is the routine use of cost-effectiveness analyses or health technology assessments to determine which medical technologies offer value-for-money. The manner in which these assessments are conducted suggests that, holding all else equal, the economic value of biologic drugs may be determined by how much is spent on administering these drugs or trade-offs between drug acquisition and administration costs. Yet, on the supply-side, it seems very little attention is given to how manufacturing and formulation choices affect healthcare delivery costs. This paper evaluates variations in the administration costs of biologic drugs, taking care to ensure consistent inclusion of all relevant cost resources. From this, it develops a regression-based algorithm with which manufacturers could possibly predict, during process development, how their manufacturing and formulation choices may impact on the healthcare delivery costs of their products.

  2. Cost update: Technology, safety, and costs of decommissioning reference independent spent fuel storage installations

    International Nuclear Information System (INIS)

    Miles, T.L.

    1994-07-01

    The cost estimates originally developed in NUREG/CR-2210 for decommissioning five conceptual Independent Spent Fuel Storage Installations (ISFSIs) and their supporting ancillaries (hot cell and transporter) are updated from 1981 to 1993 dollars. The costs for labor and materials increased approximately at the rate of inflation, the cost of energy increased more slowly than the rate of inflation, and the cost of low-level radioactive waste disposal increased much more rapidly than the rate of inflation. A methodology and a formula are presented for estimating the cost of decommissioning the ISFSIs at some future time, based on these current cost estimates. The formula contains essentially the same elements as the formula given in 10 CFR 50.75 for escalating the decommissioning costs for nuclear power reactors to some future time

  3. Laboratory cost and utilization containment.

    Science.gov (United States)

    Steiner, J W; Root, J M; White, D C

    1991-01-01

    The authors analyzed laboratory costs and utilization in 3,771 cases of Medicare inpatients admitted to a New England academic medical center ("the Hospital") from October 1, 1989 to September 30, 1990. The data were derived from the Hospital's Decision Resource System comprehensive data base. The authors established a historical reference point for laboratory costs as a percentage of total inpatient costs using 1981-82 Medicare claims data and cost report information. Inpatient laboratory costs were estimated at 9.5% of total inpatient costs for pre-Diagnostic Related Groups (DRGs) Medicare discharges. Using this reference point and adjusting for the Hospital's 1990 case mix, the "expected" laboratory cost was 9.3% of total cost. In fact, the cost averaged 11.5% (i.e., 24% above the expected cost level), and costs represented an even greater percentage of DRG reimbursement at 12.9%. If we regard the reimbursement as a total cost target (to eliminate losses from Medicare), then that 12.9% is 39% above the "expected" laboratory proportion of 9.3%. The Hospital lost an average of $1,091 on each DRG inpatient. The laboratory contributed 29% to this loss per case. Compared to other large hospitals, the Hospital was slightly (3%) above the mean direct cost per on-site test and significantly (58%) above the mean number of inpatient tests per inpatient day compared to large teaching hospitals. The findings suggest that careful laboratory cost analyses will become increasingly important as the proportion of patients reimbursed in a fixed manner grows. The future may hold a prospective zero-based laboratory budgeting process based on predictable patterns of DRG admissions or other fixed-reimbursement admission and laboratory utilization patterns.

  4. FACTORS AFFECTING EFFICIENT CONSTRUCTION PROJECT DESIGN DEVELOPMENT: A PERSPECTIVE FROM INDIA

    Directory of Open Access Journals (Sweden)

    Devanshu Pandit

    2015-12-01

    Full Text Available Internationally projects exhibit time and cost overrun. It is observed that problems during design development contribute significantly to delays. In India, projects undertaken by government were largely planned and designed by departmental planners and engineers. However, after globalization, projects have increased in number resulting in design outsourcing, but with attendant challenges. The paper is aimed at identifying and analysing factors in the design development phase that can have impact on project success. 30 factors related to design development were identified through two separate brainstorming sessions. A questionnaire was then administered to determine importance ranking of these factors. Relative importance index (RII was used to prioritise these factors. Top ten factors in design development identified using RII include structural design parameters, soil investigations, design quality control, topographic survey, and architectural design parameters. The results can help firms improve their design development practices by prioritising activities that could have more impact on project performance.

  5. Factors influencing decisions on delay claims in construction contracts for Indian scenario

    Directory of Open Access Journals (Sweden)

    Nitin Balkrishna Chaphalkar

    2014-03-01

    Full Text Available Construction industry in India is second largest next to agriculture. In current era of infrastructure development construction projects occupy a key position. In any construction project contract time and cost overrun is a common feature, which gives rise to claims leading to disputes. These disputes if not handled properly tend to consume time and money of all parties to the contract. To resolve the dispute in optimum time, it is essential to understand the root cause of disputes as early as possible. Hence there is a need of analyzing the disputes scientifically.  The present study reveals from the study of arbitration awards that the causes for delay claims can be grouped in domains and the probable decisions to the disputes can be traced through the probing questions considered by decision makers. This paper attempts to identify questions related to disputes for Indian scenario through literature, arbitration awards, court cases and discussions with professionals.

  6. Factors influencing decisions on delay claims in construction contracts for Indian scenario

    Directory of Open Access Journals (Sweden)

    Nitin Balkrishna Chaphalkar

    2014-03-01

    Full Text Available   Construction industry in India is second largest next to agriculture. In current era of infrastructure development construction projects occupy a key position. In any construction project contract time and cost overrun is a common feature, which gives rise to claims leading to disputes. These disputes if not handled properly tend to consume time and money of all parties to the contract. To resolve the dispute in optimum time, it is essential to understand the root cause of disputes as early as possible. Hence there is a need of analyzing the disputes scientifically.  The present study reveals from the study of arbitration awards that the causes for delay claims can be grouped in domains and the probable decisions to the disputes can be traced through the probing questions considered by decision makers. This paper attempts to identify questions related to disputes for Indian scenario through literature, arbitration awards, court cases and discussions with professionals.

  7. Effects of cost metric on cost-effectiveness of protected-area network design in urban landscapes.

    Science.gov (United States)

    Burkhalter, J C; Lockwood, J L; Maslo, B; Fenn, K H; Leu, K

    2016-04-01

    A common goal in conservation planning is to acquire areas that are critical to realizing biodiversity goals in the most cost-effective manner. The way monetary acquisition costs are represented in such planning is an understudied but vital component to realizing cost efficiencies. We sought to design a protected-area network within a forested urban region that would protect 17 birds of conservation concern. We compared the total costs and spatial structure of the optimal protected-area networks produced using three acquisition-cost surrogates (area, agricultural land value, and tax-assessed land value). Using the tax-assessed land values there was a 73% and 78% cost savings relative to networks derived using area or agricultural land value, respectively. This cost reduction was due to the considerable heterogeneity in acquisition costs revealed in tax-assessed land values, especially for small land parcels, and the corresponding ability of the optimization algorithm to identify lower-cost parcels for inclusion that had equal value to our target species. Tax-assessed land values also reflected the strong spatial differences in acquisition costs (US$0.33/m(2)-$55/m(2)) and thus allowed the algorithm to avoid inclusion of high-cost parcels when possible. Our results add to a nascent but growing literature that suggests conservation planners must consider the cost surrogate they use when designing protected-area networks. We suggest that choosing cost surrogates that capture spatial- and size-dependent heterogeneity in acquisition costs may be relevant to establishing protected areas in urbanizing ecosystems. © 2015 Society for Conservation Biology.

  8. Costs of hospital malnutrition.

    Science.gov (United States)

    Curtis, Lori Jane; Bernier, Paule; Jeejeebhoy, Khursheed; Allard, Johane; Duerksen, Donald; Gramlich, Leah; Laporte, Manon; Keller, Heather H

    2017-10-01

    Hospital malnutrition has been established as a critical, prevalent, and costly problem in many countries. Many cost studies are limited due to study population or cost data used. The aims of this study were to determine: the relationship between malnutrition and hospital costs; the influence of confounders on, and the drivers (medical or surgical patients or degree of malnutrition) of the relationship; and whether hospital reported cost data provide similar information to administrative data. To our knowledge, the last two goals have not been studied elsewhere. Univariate and multivariate analyses were performed on data from the Canadian Malnutrition Task Force prospective cohort study combined with administrative data from the Canadian Institute for Health Information. Subjective Global Assessment was used to assess the relationship between nutritional status and length of stay and hospital costs, controlling for health and demographic characteristics, for 956 patients admitted to medical and surgical wards in 18 hospitals across Canada. After controlling for patient and hospital characteristics, moderately malnourished patients' (34% of surveyed patients) hospital stays were 18% (p = 0.014) longer on average than well-nourished patients. Medical stays increased by 23% (p = 0.014), and surgical stays by 32% (p = 0.015). Costs were, on average, between 31% and 34% (p-values < 0.05) higher than for well-nourished patients with similar characteristics. Severely malnourished patients (11% of surveyed patients) stayed 34% (p = 0.000) longer and had 38% (p = 0.003) higher total costs than well-nourished patients. They stayed 53% (p = 0.001) longer in medical beds and had 55% (p = 0.003) higher medical costs, on average. Trends were similar no matter the type of costing data used. Over 40% of patients were found to be malnourished (1/3 moderately and 1/10 severely). Malnourished patients had longer hospital stays and as a result cost more than well

  9. A review on cost-effectiveness and cost-utility of psychosocial care in cancer patients

    Directory of Open Access Journals (Sweden)

    Femke Jansen

    2016-01-01

    Full Text Available Several psychosocial care interventions have been found effective in improving psychosocial outcomes in cancer patients. At present, there is increasingly being asked for information on the value for money of this type of intervention. This review therefore evaluates current evidence from studies investigating cost-effectiveness or cost-utility of psychosocial care in cancer patients. A systematic search was conducted in PubMed and Web of Science yielding 539 unique records, of which 11 studies were included in the study. Studies were mainly performed in breast cancer populations or mixed cancer populations. Studied interventions included collaborative care (four studies, group interventions (four studies, individual psychological support (two studies, and individual psycho-education (one study. Seven studies assessed the cost-utility of psychosocial care (based on quality-adjusted-life-years while three studies investigated its cost-effectiveness (based on profile of mood states [mood], Revised Impact of Events Scale [distress], 12-Item Health Survey [mental health], or Fear of Progression Questionnaire [fear of cancer progression]. One study did both. Costs included were intervention costs (three studies, intervention and direct medical costs (five studies, or intervention, direct medical, and direct nonmedical costs (three studies. In general, results indicated that psychosocial care is likely to be cost-effective at different, potentially acceptable, willingness-to-pay thresholds. Further research should be performed to provide more clear information as to which psychosocial care interventions are most cost-effective and for whom. In addition, more research should be performed encompassing potential important cost drivers from a societal perspective, such as productivity losses or informal care costs, in the analyses.

  10. Contemporary Costs Associated With Transcatheter Aortic Valve Replacement: A Propensity-Matched Cost Analysis.

    Science.gov (United States)

    Ailawadi, Gorav; LaPar, Damien J; Speir, Alan M; Ghanta, Ravi K; Yarboro, Leora T; Crosby, Ivan K; Lim, D Scott; Quader, Mohammed A; Rich, Jeffrey B

    2016-01-01

    The Placement of Aortic Transcatheter Valve (PARTNER) trial suggested an economic advantage for transcatheter aortic valve replacement (TAVR) for high-risk patients. The purpose of this study was to evaluate the cost effectiveness of TAVR in the "real world" by comparing TAVR with surgical aortic valve replacement (SAVR) in intermediate-risk and high-risk patients. A multiinstitutional database of The Society of Thoracic Surgeons (STS) (2011 to 2013) linked with estimated cost data was evaluated for isolated TAVR and SAVR operations (n = 5,578). TAVR-treated patients (n = 340) were 1:1 propensity matched with SAVR-treated patients (n = 340). Patients undergoing SAVR were further stratified into intermediate-risk (SAVR-IR: predicted risk of mortality [PROM] 4% to 8%) and high-risk (SAVR-HR: PROM >8%) cohorts. Median STS PROM for TAVR was 6.32% compared with 6.30% for SAVR (SAVR-IR 4.6% and SAVR-HR 12.4%). A transfemoral TAVR approach was most common (61%). Mortality was higher for TAVR (10%) compared with SAVR (6%, p costs compared with SAVR ($69,921 vs $33,598, p cost of TAVR was largely driven by the cost of the valve (all p cost savings versus TAVR. TAVR was associated with greater total costs and mortality compared with SAVR in intermediate-risk and high-risk patients while conferring lower major morbidity and improved resource use. Increased cost of TAVR appears largely related to the cost of the valve. Until the price of TAVR valves decreases, these data suggest that TAVR may not provide the most cost-effective strategy, particularly for intermediate-risk patients. Copyright © 2016 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  11. COST BM0607

    International Nuclear Information System (INIS)

    Jong, M. de

    2009-01-01

    COST is an intergovernmental framework for European Cooperation in Science and Technology, allowing the coordination of nationally-funded research on a European level. COST contributes to reducing the fragmentation in European research investments and opening the European Research Area to cooperation worldwide. COST is specifically designed to network researchers mainly within the European Union that work on a specific topic. This COST BM0607 Action on cancer therapy using innovative targeting nanomedicines is highly multidisciplinary: nuclear medicine physicians, clinical oncologists, surgeons, physicists, radiobiologists, (in)organic chemists, radiochemists, radiopharmacists, pathologists and scientists from biomics participate in it. They define innovative new targets for cancer therapy, develop lead compounds and new radiolabelled ligands as vectors, perform molecular imaging and biologic testing, develop improved software and protocols for dosimetric calculations and select new vectors for early human use. Within the COST BM0607 more than 100 scientists from 21 countries are participating to work within 5 different working groups. Working group 1 works on the establishment of Database on Molecular Targets for Targeted Radionuclide Therapy, working group 2 deals with the development and improvement of chemistry related to new molecules for targeted radionuclide therapy. Working group 3 is dedicated to dosimetry aspects, whereas working group 4 tries to optimize the use of new radionuclides for therapy from cyclotron, reactor and generator production. Finally, working group 5 has the aim to bring together research related to pharmacology and small animal imaging with new tracers for targeted radionuclide therapy. COST thereby organizes annual meetings of the whole group and in between dedicated meetings of the working groups. Besides organizing meetings one aim of COST is additionally to promote young researchers where short term scientific missions (STSM) are

  12. Examination of incentive mechanisms for innovative technologies applicable to utility and nonutility power generators

    Energy Technology Data Exchange (ETDEWEB)

    McDermott, K.A. [Illinois Commerce Commission, Springfield, IL (United States); Bailey, K.A.; South, D.W. [Argonne National Lab., IL (United States). Environmental Assessment and Information Sciences Div.

    1993-08-01

    Innovative technologies, built by either utility or nonutility power generators, have the potential to lower costs with less environmental emissions than conventional technologies. However, the public-good nature of information, along with uncertain costs, performance, and reliability, discourages rapid adoption of these technologies. The effect of regulation of electricity production may also have an adverse impact on motivation to innovate. Slower penetration of cleaner, more efficient technologies could result in greater levels of pollution, higher electricity prices, and a reduction in international competitiveness. Regulatory incentives could encourage adoption and deployment of innovative technologies of all kinds, inducting clean coal technologies. Such incentives must be designed to offset risks inherent in innovative technology and encourage cost-effective behavior. To evaluate innovative and conventional technologies equally, the incremental cost of risk (ICR) of adopting the innovative technology must be determined. Through the ICR, the magnitude of incentive required to make a utility (or nonutility) power generator equally motivated to use either conventional or innovative technologies can be derived. Two technology risks are examined: A construction risk, represented by a 15% cost overrun, and an operating risk, represented by a increased forced outage rate (decreased capacity factor). Different incentive mechanisms and measurement criteria are used to assess the effects of these risks on ratepayers and shareholders. In most cases, a regulatory incentive could offset the perceived risks while encouraging cost-effective behavior by both utility and nonutility power generators. Not only would the required incentive be recouped, but the revenue requirements would be less for the innovative technology; also, less environmental pollution would be generated. In the long term, ratepayers and society would benefit from innovative technologies.

  13. The cost of systemic therapy for metastatic colorectal carcinoma in Slovenia: discrepancy analysis between cost and reimbursement

    International Nuclear Information System (INIS)

    Mesti, Tanja; Boshkoska, Biljana Mileva; Kos, Mitja; Tekavčič, Metka; Ocvirk, Janja

    2015-01-01

    The aim of the study was to estimate the direct medical costs of metastatic colorectal cancer (mCRC) treated at the Institute of Oncology Ljubljana and to question the healthcare payment system in Slovenia. Using an internal patient database, the costs of mCRC patients were estimated in 2009 by examining (1) mCRC direct medical related costs, and (2) the cost difference between payment received by Slovenian health insurance and actual mCRC costs. Costs were analysed in the treatment phase of the disease by assessing the direct medical costs of hospital treatment with systemic therapy together with hospital treatment of side effects, without assessing radiotherapy or surgical treatment. Follow-up costs, indirect medical costs, and nonmedical costs were not included. A total of 209 mCRC patients met all eligibility criteria. The direct medical costs of mCRC hospitalization with systemic therapy in Slovenia for 2009 were estimated as the cost of medications (cost of systemic therapy + cost of drugs for premedication) + labor cost (the cost of carrying out systemic treatment) + cost of lab tests + cost of imaging tests + KRAS testing cost + cost of hospital treatment due to side effects of mCRC treatment, and amounted to €3,914,697. The difference between the cost paid by health insurance and actual costs, estimated as direct medical costs of hospitalization of mCRC patients treated with systemic therapy at the Institute of Oncology Ljubljana in 2009, was €1,900,757.80. The costs paid to the Institute of Oncology Ljubljana by health insurance for treating mCRC with systemic therapy do not match the actual cost of treatment. In fact, the difference between the payment and the actual cost estimated as direct medical costs of hospitalization of mCRC patients treated with systemic therapy at the Institute of Oncology Ljubljana in 2009 was €1,900,757.80. The model Australian Refined Diagnosis Related Groups (AR-DRG) for cost assessment in oncology being currently used

  14. The many costs of sex.

    Science.gov (United States)

    Lehtonen, Jussi; Jennions, Michael D; Kokko, Hanna

    2012-03-01

    Explaining the evolution of sex is challenging for biologists. A 'twofold cost' compared with asexual reproduction is often quoted. If a cost of this magnitude exists, the benefits of sex must be large for it to have evolved and be maintained. Focusing on benefits can be misleading, as this sidelines important questions about the cost of sex: what is the source of the twofold cost: males, genome dilution or both? Does the cost deviate from twofold? What other factors make sex costly? How should the costs of sex be empirically measured? The total cost of sex and how it varies in different contexts must be known to determine the benefits needed to account for the origin and maintenance of sex. Copyright © 2011 Elsevier Ltd. All rights reserved.

  15. Transmission line capital costs

    International Nuclear Information System (INIS)

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy's Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs

  16. Decommissioning Unit Cost Data

    International Nuclear Information System (INIS)

    Sanford, P. C.; Stevens, J. L.; Brandt, R.

    2002-01-01

    The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for

  17. HTGR Cost Model Users' Manual

    International Nuclear Information System (INIS)

    Gandrik, A.M.

    2012-01-01

    The High Temperature Gas-Cooler Reactor (HTGR) Cost Model was developed at the Idaho National Laboratory for the Next Generation Nuclear Plant Project. The HTGR Cost Model calculates an estimate of the capital costs, annual operating and maintenance costs, and decommissioning costs for a high-temperature gas-cooled reactor. The user can generate these costs for multiple reactor outlet temperatures; with and without power cycles, including either a Brayton or Rankine cycle; for the demonstration plant, first of a kind, or nth of a kind project phases; for a single or four-pack configuration; and for a reactor size of 350 or 600 MWt. This users manual contains the mathematical models and operating instructions for the HTGR Cost Model. Instructions, screenshots, and examples are provided to guide the user through the HTGR Cost Model. This model was design for users who are familiar with the HTGR design and Excel. Modification of the HTGR Cost Model should only be performed by users familiar with Excel and Visual Basic.

  18. NASA Instrument Cost/Schedule Model

    Science.gov (United States)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  19. Low-cost inertial measurement unit.

    Energy Technology Data Exchange (ETDEWEB)

    Deyle, Travis Jay

    2005-03-01

    Sandia National Laboratories performs many expensive tests using inertial measurement units (IMUs)--systems that use accelerometers, gyroscopes, and other sensors to measure flight dynamics in three dimensions. For the purpose of this report, the metrics used to evaluate an IMU are cost, size, performance, resolution, upgradeability and testing. The cost of a precision IMU is very high and can cost hundreds of thousands of dollars. Thus the goals and results of this project are as follows: (1) Examine the data flow in an IMU and determine a generic IMU design. (2) Discuss a high cost IMU implementation and its theoretically achievable results. (3) Discuss design modifications that would save money for suited applications. (4) Design and implement a low cost IMU and discuss its theoretically achievable results. (5) Test the low cost IMU and compare theoretical results with empirical results. (6) Construct a more streamlined printed circuit board design reducing noise, increasing capabilities, and constructing a self-contained unit. Using these results, we can compare a high cost IMU versus a low cost IMU using the metrics from above. Further, we can examine and suggest situations where a low cost IMU could be used instead of a high cost IMU for saving cost, size, or both.

  20. Cyberspace Math Models

    Science.gov (United States)

    2013-06-01

    Poster ) Visualizing Complexity of Sunspot Cycles Via Wavelet Transform, the Summer Intern Research Day, August 3, WPAFB 2010, Dayton, OH. 11...AOL- Spam-and-chat- dont -mix/2100-1032_3-1024010.html. [7] B. Krebs, “Yahoo! Messenger network overrun by bots,” Washington Post web article, Aug 2007