  1. Regulation on control systems tests

    International Nuclear Information System (INIS)

    Grau, J.; Navarro, J.M.

    1978-01-01

    Requirements under regulation applicable to the testing of control systems and controlled equipments in the case of USA nuclear projects are examined. They are reviewed, in particular, the following standards and criteria: 10 Code of Federal Regulations 50, Appendix A, General Design Criteria 20 and 21; IEEE Standards 279 and 308; IEEE Standard 338; US Regulatory Guides 1.22 and 1.118.(J.E.de C.)

  2. Test results of HTTR control system

    International Nuclear Information System (INIS)

    Motegi, Toshihiro; Iigaki, Kazuhiko; Saito, Kenji; Sawahata, Hiroaki; Hirato, Yoji; Kondo, Makoto; Shibutani, Hideki; Ogawa, Satoru; Shinozaki, Masayuki; Mizushima, Toshihiko; Kawasaki, Kozo

    2006-06-01

    The plant control performance of the IHX helium flow rate control system, the PPWC helium flow rate control system, the secondary helium flow rate control system, the inlet temperature control system, the reactor power control system and the outlet temperature control system of the HTTR are obtained through function tests and power-up tests. As the test results, the control systems show stable control response under transient condition. Both of inlet temperature control system and reactor power control system shows stable operation from 30% to 100%, respectively. This report describes the outline of control systems and test results. (author)

  3. Minicomputer controlled test system for process control and monitoring systems

    International Nuclear Information System (INIS)

    Worster, L.D.

    A minicomputer controlled test system for testing process control and monitoring systems is described. This system, in service for over one year, has demonstrated that computerized control of such testing has a real potential for expanding the scope of the testing, improving accuracy of testing, and significantly reducing the time required to do the testing. The test system is built around a 16-bit minicomputer with 12K of memory. The system programming language is BASIC with the addition of assembly level routines for communication with the peripheral devices. The peripheral devices include a 100 channel scanner, analog-to-digital converter, visual display, and strip printer. (auth)

  4. Unit Testing for Command and Control Systems

    Science.gov (United States)

    Alexander, Joshua

    2018-01-01

    Unit tests were created to evaluate the functionality of a Data Generation and Publication tool for a command and control system. These unit tests are developed to constantly evaluate the tool and ensure it functions properly as the command and control system grows in size and scope. Unit tests are a crucial part of testing any software project and are especially instrumental in the development of a command and control system. They save resources, time and costs associated with testing, and catch issues before they become increasingly difficult and costly. The unit tests produced for the Data Generation and Publication tool to be used in a command and control system assure the users and stakeholders of its functionality and offer assurances which are vital in the launching of spacecraft safely.

  5. Spaceport Command and Control System Automation Testing

    Science.gov (United States)

    Hwang, Andrew

    2017-01-01

    The Spaceport Command and Control System (SCCS) is the National Aeronautics and Space Administrations (NASA) launch control system for the Orion capsule and Space Launch System, the next generation manned rocket currently in development. This large system requires high quality testing that will properly measure the capabilities of the system. Automating the test procedures would save the project time and money. Therefore, the Electrical Engineering Division at Kennedy Space Center (KSC) has recruited interns for the past two years to work alongside full-time engineers to develop these automated tests, as well as innovate upon the current automation process.

  6. Spaceport Command and Control System Automated Testing

    Science.gov (United States)

    Stein, Meriel

    2017-01-01

    The Spaceport Command and Control System (SCCS) is the National Aeronautics and Space Administrations (NASA) launch control system for the Orion capsule and Space Launch System, the next generation manned rocket currently in development. This large system requires high quality testing that will properly measure the capabilities of the system. Automating the test procedures would save the project time and money. Therefore, the Electrical Engineering Division at Kennedy Space Center (KSC) has recruited interns for the past two years to work alongside full-time engineers to develop these automated tests, as well as innovate upon the current automation process.

  7. The BNL Accelerator Test Facility control system

    International Nuclear Information System (INIS)

    Malone, R.; Bottke, I.; Fernow, R.; Ben-Zvi, I.

    1993-01-01

    Described is the VAX/CAMAC-based control system for Brookhaven National Laboratory's Accelerator Test Facility, a laser/linac research complex. Details of hardware and software configurations are presented along with experiences of using Vsystem, a commercial control system package

  8. Spaceport Command and Control System Automation Testing

    Science.gov (United States)

    Plano, Tom

    2017-01-01

    The goal of automated testing is to create and maintain a cohesive infrastructure of robust tests that could be run independently on a software package in its entirety. To that end, the Spaceport Command and Control System (SCCS) project at the National Aeronautics and Space Administration's (NASA) Kennedy Space Center (KSC) has brought in a large group of interns to work side-by-side with full time employees to do just this work. Thus, our job is to implement the tests that will put SCCS through its paces.

  9. Tritium system test assembly control system cost estimate

    International Nuclear Information System (INIS)

    Stutz, R.A.

    1979-01-01

    The principal objectives of the Tritium Systems Test Assembly (TSTA), which includes the development, demonstration and interfacing of technologies related to the deuterium--tritium fuel cycle for fusion reactor systems, are concisely stated. The various integrated subsystems comprising TSTA and their functions are discussed. Each of the four major subdivisions of TSTA, including the main process system, the environmental and safety systems, supporting systems and the physical plant are briefly discussed. An overview of the Master Data Acquisition and Control System, which will control all functional operation of TSTA, is provided

  10. Ground test accelerator control system software

    International Nuclear Information System (INIS)

    Burczyk, L.; Dalesio, R.; Dingler, R.; Hill, J.; Howell, J.A.; Kerstiens, D.; King, R.; Kozubal, A.; Little, C.; Martz, V.; Rothrock, R.; Sutton, J.

    1988-01-01

    This paper reports on the GTA control system that provides an environment in which the automation of a state-of-the-art accelerator can be developed. It makes use of commercially available computers, workstations, computer networks, industrial 110 equipment, and software. This system has built-in supervisory control (like most accelerator control systems), tools to support continuous control (like the process control industry), and sequential control for automatic start-up and fault recovery (like few other accelerator control systems). Several software tools support these levels of control: a real-time operating system (VxWorks) with a real-time kernel (VRTX), a configuration database, a sequencer, and a graphics editor. VxWorks supports multitasking, fast context-switching, and preemptive scheduling. VxWorks/VRTX is a network-based development environment specifically designed to work in partnership with the UNIX operating system. A data base provides the interface to the accelerator components. It consists of a run time library and a database configuration and editing tool. A sequencer initiates and controls the operation of all sequence programs (expressed as state programs). A graphics editor gives the user the ability to create color graphic displays showing the state of the machine in either text or graphics form

  11. Verification test of control rod system for HTR-10

    International Nuclear Information System (INIS)

    Zhou Huizhong; Diao Xingzhong; Huang Zhiyong; Cao Li; Yang Nianzu

    2002-01-01

    There are 10 sets of control rods and driving devices in 10 MW High Temperature Gas-cooled Test Reactor (HTR-10). The control rod system is the controlling and shutdown system of HTR-10, which is designed for reactor criticality, operation, and shutdown. In order to guarantee technical feasibility, a series of verification tests were performed, including room temperature test, thermal test, test after control rod system installed in HTR-10, and test of control rod system before HTR-10 first criticality. All the tests data showed that driving devices working well, control rods running smoothly up and down, random position settling well, and exactly position indicating

  12. Launch Control System Software Development System Automation Testing

    Science.gov (United States)

    Hwang, Andrew

    2017-01-01

    The Spaceport Command and Control System (SCCS) is the National Aeronautics and Space Administration's (NASA) launch control system for the Orion capsule and Space Launch System, the next generation manned rocket currently in development. This system requires high quality testing that will measure and test the capabilities of the system. For the past two years, the Exploration and Operations Division at Kennedy Space Center (KSC) has assigned a group including interns and full-time engineers to develop automated tests to save the project time and money. The team worked on automating the testing process for the SCCS GUI that would use streamed simulated data from the testing servers to produce data, plots, statuses, etc. to the GUI. The software used to develop automated tests included an automated testing framework and an automation library. The automated testing framework has a tabular-style syntax, which means the functionality of a line of code must have the appropriate number of tabs for the line to function as intended. The header section contains either paths to custom resources or the names of libraries being used. The automation library contains functionality to automate anything that appears on a desired screen with the use of image recognition software to detect and control GUI components. The data section contains any data values strictly created for the current testing file. The body section holds the tests that are being run. The function section can include any number of functions that may be used by the current testing file or any other file that resources it. The resources and body section are required for all test files; the data and function sections can be left empty if the data values and functions being used are from a resourced library or another file. To help equip the automation team with better tools, the Project Lead of the Automated Testing Team, Jason Kapusta, assigned the task to install and train an optical character recognition (OCR

  13. PLC based control system for RAM assembly test facility

    International Nuclear Information System (INIS)

    Kulkarni, S.S.; Kumar, Vinaya; Chandra, Umesh

    1994-01-01

    The flexibility, expandability, ease of programming and diagnostic features makes the programmable logic controller (PLC) suitable for a variety of control applications in engineering system test facilities. A PLC based control system for RAM assembly test facility (RATF) and for testing the related hydraulic components is being developed and installed at BARC. This paper describes the approach taken for meeting the control requirements and illustrates the PLC software that has been developed. (author). 1 fig

  14. Testing power system controllers by real-time simulation

    DEFF Research Database (Denmark)

    Venne, Philippe; Guillaud, Xavier; Sirois, Frédéric

    2007-01-01

    In this paper, we present a number of state-of-the art methods for testing power system controllers based on the use of a real-time power system simulator. After introducing Hypersim, we list and discuss the different means of connection between the controller under tests and the power system...

  15. Beam test with the HIMAC RF control system

    International Nuclear Information System (INIS)

    Kanazawa, M.; Sato, K.; Itano, A.

    1992-01-01

    RF system of the HIMAC synchrotron has been developed and tested in the factory. With the high power system, we could sweep the acceleration frequency from 1MHz to 8MHz with the acceleration voltage of 6KV. The performance of the RF control system has been confirmed with a developed simulator of the synchrotron oscillation. Following these two tests in the factory, we had a beam test of the RF control system at TARN-II in INS (Institute for Nuclear Study, University of Tokyo). This paper describes the beam test and its results. (author)

  16. Reactivity control system of the high temperature engineering test reactor

    International Nuclear Information System (INIS)

    Tachibana, Yukio; Sawahata, Hiroaki; Iyoku, Tatsuo; Nakazawa, Toshio

    2004-01-01

    The reactivity control system of the high temperature engineering test reactor (HTTR) consists of a control rod system and a reserve shutdown system. During normal operation, reactivity is controlled by the control rod system, which consists of 32 control rods (16 pairs) and 16 control rod drive mechanisms except for the case when the center control rods are removed to perform an irradiation test. In an unlikely event that the control rods fail to be inserted, reserve shutdown system is provided to insert pellets of neutron-absorbing material into the core. Alloy 800H is chosen for the metallic parts of the control rods. Because the maximum temperature of the control rods reaches about 900 deg. C at reactor scrams, structural design guideline and design material data on Alloy 800H are needed for the high temperature design. The design guideline for the HTTR control rod is based on ASME Code Case N-47-21. Design material data is also determined and shown in this paper. Observing the guideline, temperature and stress analysis were conducted; it can be confirmed that the target life of the control rods of 5 years can be achieved. Various tests conducted for the control rod system and the reserve shutdown system are also described

  17. An Integration Testing Facility for the CERN Accelerator Controls System

    CERN Document Server

    Stapley, N; Bau, J C; Deghaye, S; Dehavay, C; Sliwinski, W; Sobczak, M

    2009-01-01

    A major effort has been invested in the design, development, and deployment of the LHC Control System. This large control system is made up of a set of core components and dependencies, which although tested individually, are often not able to be tested together on a system capable of representing the complete control system environment, including hardware. Furthermore this control system is being adapted and applied to CERN's whole accelerator complex, and in particular for the forthcoming renovation of the PS accelerators. To ensure quality is maintained as the system evolves, and toimprove defect prevention, the Controls Group launched a project to provide a dedicated facility for continuous, automated, integration testing of its core components to incorporate into its production process. We describe the project, initial lessons from its application, status, and future directions.

  18. Carboy Security Testing and Training Programs for Industrial Control Systems

    International Nuclear Information System (INIS)

    Noyes, Daniel

    2012-01-01

    Service providers rely on industrial control systems (ICS) to manage the flow of water at dams, open breakers on power grids, control ventilation and cooling in nuclear power plants, and more. In today's interconnected environment, this can present a serious cyber security challenge. To combat this growing challenge, government, private industry, and academia are working together to reduce cyber risks. The Idaho National Laboratory (INL) is a key contributor to the Department of Energy National SCADA Test Bed (NSTB) and the Department of Homeland Security (DHS) Control Systems Security Program (CSSP), both of which focus on improving the overall security posture of ICS in the national critical infrastructure. In support of the NSTB, INL hosts a dedicated SCADA testing facility which consists of multiple control systems supplied by leading national and international manufacturers. Within the test bed, INL researchers systematically examine control system components and work to identify vulnerabilities. In support of the CSSP, INL develops and conducts training courses which are designed to increase awareness and defensive capabilities for IT/Control System professionals. These training vary from web-based cyber security training for control systems engineers to more advanced hands-on training that culminates with a Red Team/Blue Team exercise that is conducted within an actual control systems environment. INL also provides staffing and operational support to the DHS Industrial Control Systems Cyber Emergency Response Team (ICS-CERT) Security Operations Center which responds to and analyzes control systems cyber incidents across the 18 US critical infrastructure sectors

  19. Cyber Security Testing and Training Programs for Industrial Control Systems

    International Nuclear Information System (INIS)

    Noyes, Daniel

    2012-01-01

    Service providers rely on industrial control systems (ICS) to manage the flow of water at dams, open breakers on power grids, control ventilation and cooling in nuclear power plants, and more. In today's interconnected environment, this can present a serious cyber security challenge. To combat this growing challenge, government, private industry, and academia are working together to reduce cyber risks. The Idaho National Laboratory (INL) is a key contributor to the Department of Energy National SCADA Test Bed (NSTB) and the Department of Homeland Security (DHS) Control Systems Security Program (CSSP), both of which focus on improving the overall security posture of ICS in the national critical infrastructure. In support of the NSTB, INL hosts a dedicated SCADA testing facility which consists of multiple control systems supplied by leading national and international manufacturers. Within the test bed, INL researchers systematically examine control system components and work to identify vulnerabilities. In support of the CSSP, INL develops and conducts training courses which are designed to increase awareness and defensive capabilities for IT/Control System professionals. These trainings vary from web-based cyber security trainings for control systems engineers to more advanced hands-on training that culminates with a Red Team/ Blue Team exercise that is conducted within an actual control systems environment. INL also provides staffing and operational support to the DHS Industrial Control Systems Cyber Emergency Response Team (ICS-CERT) Security Operations Center which responds to and analyzes control systems cyber incidents across the 18 US critical infrastructure sectors.

  20. Cyber Security Testing and Training Programs for Industrial Control Systems

    Energy Technology Data Exchange (ETDEWEB)

    Daniel Noyes

    2012-03-01

    Service providers rely on industrial control systems (ICS) to manage the flow of water at dams, open breakers on power grids, control ventilation and cooling in nuclear power plants, and more. In today's interconnected environment, this can present a serious cyber security challenge. To combat this growing challenge, government, private industry, and academia are working together to reduce cyber risks. The Idaho National Laboratory (INL) is a key contributor to the Department of Energy National SCADA Test Bed (NSTB) and the Department of Homeland Security (DHS) Control Systems Security Program (CSSP), both of which focus on improving the overall security posture of ICS in the national critical infrastructure. In support of the NSTB, INL hosts a dedicated SCADA testing facility which consists of multiple control systems supplied by leading national and international manufacturers. Within the test bed, INL researchers systematically examine control system components and work to identify vulnerabilities. In support of the CSSP, INL develops and conducts training courses which are designed to increase awareness and defensive capabilities for IT/Control System professionals. These trainings vary from web-based cyber security trainings for control systems engineers to more advanced hands-on training that culminates with a Red Team/ Blue Team exercise that is conducted within an actual control systems environment. INL also provides staffing and operational support to the DHS Industrial Control Systems Cyber Emergency Response Team (ICS-CERT) Security Operations Center which responds to and analyzes control systems cyber incidents across the 18 US critical infrastructure sectors.

  1. Spaceport Command and Control System User Interface Testing

    Science.gov (United States)

    Huesman, Jacob

    2016-01-01

    The Spaceport Command and Control System will be the National Aeronautics and Space Administration's newest system for launching commercial and government owned spacecraft. It's a large system with many parts all in need of testing. To improve upon testing already done by NASA engineers, the Engineering Directorate, Electrical Division (NE-E) of Kennedy Space Center has hired a group of interns each of the last few semesters to develop novel ways of improving the testing process.

  2. AP-102/104 Retrieval control system qualification test procedure

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Qualification Test Procedure documents the results of the qualification testing that was performed on the Project W-211, ''Initial Tank Retrieval Systems,'' retrieval control system (RCS) for tanks 241-AP-102 and 241-AP-104. The results confirm that the RCS has been programmed correctly and that the two related hardware enclosures have been assembled in accordance with the design documents

  3. A Control Systems Concept Inventory Test Design and Assessment

    Science.gov (United States)

    Bristow, M.; Erkorkmaz, K.; Huissoon, J. P.; Jeon, Soo; Owen, W. S.; Waslander, S. L.; Stubley, G. D.

    2012-01-01

    Any meaningful initiative to improve the teaching and learning in introductory control systems courses needs a clear test of student conceptual understanding to determine the effectiveness of proposed methods and activities. The authors propose a control systems concept inventory. Development of the inventory was collaborative and iterative. The…

  4. Acceptance test plan for the Waste Information Control System

    International Nuclear Information System (INIS)

    Flynn, D.F.

    1994-01-01

    This document describes the acceptance test plan for the WICS system. The Westinghouse Hanford Company (WHC) Hazardous Material Control Group (HMC) of the 222-S Laboratory has requested the development of a system to help resolve many of the difficulties associated with tracking and data collection of containers and drums of waste. This system has been identified as Waste Information and Control System (WICS). The request for developing and implementing WICS has been made to the Automation and Simulation Engineering Group (ASE)

  5. Design and test of a girder control system at NSRRC

    International Nuclear Information System (INIS)

    Wang, H.S.; Tsai, Y.L.; Perng, S.Y.; Chen, M.L.; Hsu, K.H.; Lai, W.Y.; Tseng, T.C.; Chen, J.R.

    2012-01-01

    A girder control system is proposed to quickly and precisely adjust the displacement and rotating angle of all girders in the storage ring with little manpower at the Taiwan Photon Source (TPS) project at National Synchrotron Research Center (NSRRC). In this control girder system, six motorized cam movers supporting a girder are driven on three pedestals to perform six-axis adjustments of a girder. A tilt-meter monitors the pitch and roll of each girder; several touch sensors measure the relative displacement between consecutive girders. Moreover, a laser position sensitive detector (PSD) system measuring the relative displacement between straight-section girders is included in this girder control system. Operator can use subroutines developed by MATLAB to control every local girder control system via the web. The test results show that the girder control system adjusts girders quickly, precisely and stably

  6. Automation of testing the metrological reliability of nondestructive control systems

    International Nuclear Information System (INIS)

    Zhukov, Yu.A.; Isakov, V.B.; Karlov, Yu.K.; Kovalevskij, Yu.A.

    1987-01-01

    Opportunities of microcomputers are used to solve the problem of testing control-measuring systems. Besides the main program the program of data processing when characterizing the nondestructive control systems is written in the microcomputer. The program includes two modules. The first module contains tests-programs, by which accuracy of functional elements of the microcomputer and interface elements with issuing a message to the operator on readiness of the elements for operation and failure of a certain element are determined. The second module includes: calculational programs when determining metrological reliability of measuring channel reliability, a calculational subprogram for random statistical measuring error, time instability and ''dead time''. Automation of testing metrological reliability of the nondestructive control systems increases reliability of determining metrological parameters and reduces time of system testing

  7. Test specifications for the waste information and control system

    International Nuclear Information System (INIS)

    Flynn, D.F.

    1994-01-01

    This document describes the test specifications for the testing of the WICS system. The Westinghouse Hanford Company (WHC) Hazardous Material Control Group (HMC) of the 222-S Laboratory has requested the development of a system to help resolve many of the difficulties associated with tracking and data collection of containers and drums of waste. This system has been identified as Waste Information and Control System (WICS). The request for developing and implementing WICS has been made to the Automation and Simulation Engineering Group (ASE)

  8. Operatibility test procedure for the Waste Information and Control System

    International Nuclear Information System (INIS)

    Flynn, D.F.

    1994-01-01

    This document describes the operability test procedure for the WICS. The Westinghouse Hanford Company (WHC) Hazardous Material Control Group (HMC) of the 222-S Laboratory has requested the development of a system to help resolve many of the difficulties associated with tracking and data collection of containers and drums of waste. This system has been identified as Waste Information and Control System (WICS). The request for developing and implementing WICS has been made to the Automation and Simulation Engineering Group (ASE)

  9. Quick setup of test unit for accelerator control system

    International Nuclear Information System (INIS)

    Fu, W.; D'Ottavio, T.; Gassner, D.; Nemesure, S.; Morris, J.

    2011-01-01

    Testing a single hardware unit of an accelerator control system often requires the setup of a program with graphical user interface. Developing a dedicated application for a specific hardware unit test could be time consuming and the application may become obsolete after the unit tests. This paper documents a methodology for quick design and setup of an interface focused on performing unit tests of accelerator equipment with minimum programming work. The method has three components. The first is a generic accelerator device object (ADO) manager which can be used to setup, store, and log testing controls parameters for any unit testing system. The second involves the design of a TAPE (Tool for Automated Procedure Execution) sequence file that specifies and implements all te testing and control logic. The sting third is the design of a PET (parameter editing tool) page that provides the unit tester with all the necessary control parameters required for testing. This approach has been used for testing the horizontal plane of the Stochastic Cooling Motion Control System at RHIC.

  10. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    Energy Technology Data Exchange (ETDEWEB)

    BARNES, D.A.

    2000-06-01

    The purpose of this document is to describe tests performed to validate Revision 12.0 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be communicating to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

  11. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    BARNES, D.A.

    2000-01-01

    The purpose of this document is to describe tests performed to validate Revision 12.0 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be communicating to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab

  12. 242A Distributed Control System Year 2000 Acceptance Test Report

    Energy Technology Data Exchange (ETDEWEB)

    TEATS, M.C.

    1999-08-31

    This report documents acceptance test results for the 242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. This report documents the test results obtained by acceptance testing as directed by procedure HNF-2695. This verification procedure will document the initial testing and evaluation of the potential 242-A Distributed Control System (DCS) operating difficulties across the year 2000 boundary and the calendar adjustments needed for the leap year. Baseline system performance data will be recorded using current, as-is operating system software. Data will also be collected for operating system software that has been modified to correct year 2000 problems. This verification procedure is intended to be generic such that it may be performed on any D/3{trademark} (GSE Process Solutions, Inc.) distributed control system that runs with the VMSTM (Digital Equipment Corporation) operating system. This test may be run on simulation or production systems depending upon facility status. On production systems, DCS outages will occur nine times throughout performance of the test. These outages are expected to last about 10 minutes each.

  13. 242A Distributed Control System Year 2000 Acceptance Test Report

    International Nuclear Information System (INIS)

    TEATS, M.C.

    1999-01-01

    This report documents acceptance test results for the 242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. This report documents the test results obtained by acceptance testing as directed by procedure HNF-2695. This verification procedure will document the initial testing and evaluation of the potential 242-A Distributed Control System (DCS) operating difficulties across the year 2000 boundary and the calendar adjustments needed for the leap year. Baseline system performance data will be recorded using current, as-is operating system software. Data will also be collected for operating system software that has been modified to correct year 2000 problems. This verification procedure is intended to be generic such that it may be performed on any D/3(trademark) (GSE Process Solutions, Inc.) distributed control system that runs with the VMSTM (Digital Equipment Corporation) operating system. This test may be run on simulation or production systems depending upon facility status. On production systems, DCS outages will occur nine times throughout performance of the test. These outages are expected to last about 10 minutes each

  14. Design type testing for digital instrumentation and control systems

    International Nuclear Information System (INIS)

    Bastl, W.; Mohns, G.

    1997-01-01

    The design type qualification of digital safety instrumentation and control is outlined. Experience shows that the concepts discussed, derived from codes, guidelines and standards, achieve useful results. It has likewise become clear that the systematics of design type qualification of the hardware components is also applicable to the software components. Design type qualification of the software, a premiere, could be performed unexpectedly smoothly. The hardware design type qualification proved that the hardware as a substrate of functionality and reliability is an issue that demands full attention, as compared to conventional systems. Another insight is that design qualification of digital instrumentation and control systems must include plant-independent systems tests. Digital instrumentation and control systems simply work very differently from conventional control systems, so that this testing modality is inevitable. (Orig./CB) [de

  15. Carboy Security Testing and Training Programs for Industrial Control Systems

    Energy Technology Data Exchange (ETDEWEB)

    Noyes, Daniel [Idaho National Laboratory, Idaho (United States)

    2012-03-15

    Service providers rely on industrial control systems (ICS) to manage the flow of water at dams, open breakers on power grids, control ventilation and cooling in nuclear power plants, and more. In today's interconnected environment, this can present a serious cyber security challenge. To combat this growing challenge, government, private industry, and academia are working together to reduce cyber risks. The Idaho National Laboratory (INL) is a key contributor to the Department of Energy National SCADA Test Bed (NSTB) and the Department of Homeland Security (DHS) Control Systems Security Program (CSSP), both of which focus on improving the overall security posture of ICS in the national critical infrastructure. In support of the NSTB, INL hosts a dedicated SCADA testing facility which consists of multiple control systems supplied by leading national and international manufacturers. Within the test bed, INL researchers systematically examine control system components and work to identify vulnerabilities. In support of the CSSP, INL develops and conducts training courses which are designed to increase awareness and defensive capabilities for IT/Control System professionals. These training vary from web-based cyber security training for control systems engineers to more advanced hands-on training that culminates with a Red Team/Blue Team exercise that is conducted within an actual control systems environment. INL also provides staffing and operational support to the DHS Industrial Control Systems Cyber Emergency Response Team (ICS-CERT) Security Operations Center which responds to and analyzes control systems cyber incidents across the 18 US critical infrastructure sectors.

  16. Flight Test of an Intelligent Flight-Control System

    Science.gov (United States)

    Davidson, Ron; Bosworth, John T.; Jacobson, Steven R.; Thomson, Michael Pl; Jorgensen, Charles C.

    2003-01-01

    The F-15 Advanced Controls Technology for Integrated Vehicles (ACTIVE) airplane (see figure) was the test bed for a flight test of an intelligent flight control system (IFCS). This IFCS utilizes a neural network to determine critical stability and control derivatives for a control law, the real-time gains of which are computed by an algorithm that solves the Riccati equation. These derivatives are also used to identify the parameters of a dynamic model of the airplane. The model is used in a model-following portion of the control law, in order to provide specific vehicle handling characteristics. The flight test of the IFCS marks the initiation of the Intelligent Flight Control System Advanced Concept Program (IFCS ACP), which is a collaboration between NASA and Boeing Phantom Works. The goals of the IFCS ACP are to (1) develop the concept of a flight-control system that uses neural-network technology to identify aircraft characteristics to provide optimal aircraft performance, (2) develop a self-training neural network to update estimates of aircraft properties in flight, and (3) demonstrate the aforementioned concepts on the F-15 ACTIVE airplane in flight. The activities of the initial IFCS ACP were divided into three Phases, each devoted to the attainment of a different objective. The objective of Phase I was to develop a pre-trained neural network to store and recall the wind-tunnel-based stability and control derivatives of the vehicle. The objective of Phase II was to develop a neural network that can learn how to adjust the stability and control derivatives to account for failures or modeling deficiencies. The objective of Phase III was to develop a flight control system that uses the neural network outputs as a basis for controlling the aircraft. The flight test of the IFCS was performed in stages. In the first stage, the Phase I version of the pre-trained neural network was flown in a passive mode. The neural network software was running using flight data

  17. Material control test and evaluation system at the ICPP

    International Nuclear Information System (INIS)

    Johnson, C.E.

    1979-01-01

    The US DOE is evaluating process monitoring as part of a total nuclear material safeguards system. A monitoring system is being installed at the Idaho Chemical Processing Plant to test and evaluate material control and surveillance concepts in an operating nuclear fuel reprocessing plant. Process monitoring for nuclear material control complements conventional safeguards accountability and physical protection to assure adherence to approved safeguards procedures and verify containment of nuclear materials within the processing plant

  18. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    WANDLING, R.R.

    1999-01-01

    The purpose of this document is to describe tests performed to validate Revision 11.2 of the TMACS Monitor and Control System (TMCACS) and verify that the software functions as intended by design. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab

  19. Lessons learned on the Ground Test Accelerator control system

    International Nuclear Information System (INIS)

    Kozubal, A.J.; Weiss, R.E.

    1994-01-01

    When we initiated the control system design for the Ground Test Accelerator (GTA), we envisioned a system that would be flexible enough to handle the changing requirements of an experimental project. This control system would use a developers' toolkit to reduce the cost and time to develop applications for GTA, and through the use of open standards, the system would accommodate unforeseen requirements as they arose. Furthermore, we would attempt to demonstrate on GTA a level of automation far beyond that achieved by existing accelerator control systems. How well did we achieve these goals? What were the stumbling blocks to deploying the control system, and what assumptions did we make about requirements that turned out to be incorrect? In this paper we look at the process of developing a control system that evolved into what is now the ''Experimental Physics and Industrial Control System'' (EPICS). Also, we assess the impact of this system on the GTA project, as well as the impact of GTA on EPICS. The lessons learned on GTA will be valuable for future projects

  20. Design & Test of Radio Communication and Control System for Aquaculture

    Directory of Open Access Journals (Sweden)

    Fengrong Jia

    2013-05-01

    Full Text Available Aiming at low automation degree and backward aquatic product management of current aquaculture in China, this paper designed a set of radio communication and control system which consists of 3 parts of information collection module, control module and radio communication module. This system both realizes wireless monitoring of quality parameters of water for aquaculture and realizes wireless control of water level and dissolved oxygen value through radio communication. Test results show that data transfer is more accurate and reliable after adding customized protocol and answer signals in radio communication. The highest error and missing rate within 1000 m is 0.36, the lowest error and missing rate is 0.05 and the longest response time is 49 ms. The dissolved oxygen value detection system designed in this paper is close to the testing value of existing dissolved oxygen value transmitter DO6309. With wireless data transfer mode, it has higher practicality. The wireless control of dissolved oxygen value and water level can be controlled within the appropriate range with stable and precise control. The study results can provide intelligent aquaculture model with simple operation and precise control for enormous aquatic breeders

  1. Implementation of a control system test environment in UNIX

    International Nuclear Information System (INIS)

    Brittain, C.R.; Otaduy, P.J.; Rovere, L.A.

    1990-01-01

    This paper discusses how UNIX features such as shared memory, remote procedure calls, and signalling have been used to implement a distributed computational environment ideal for the development and testing of digital control systems. The resulting environment -based on features commonly available in commercial workstations- is flexible, allows process simulation and controller development to proceed in parallel, and provides for testing and validation in a realistic environment. In addition, the use of shared memory to exchange data allows other tasks such as user interfaces and recorders to be added without affecting the process simulation or controllers. A library of functions is presented which provides a simple interface to using the features described. These functions can be used in either C or FORTRAN programs and have been tested on a network of Sun workstations and an ENCORE parallel computer. 6 refs., 2 figs

  2. A computer-controlled automated test system for fatigue and fracture testing

    International Nuclear Information System (INIS)

    Nanstad, R.K.; Alexander, D.J.; Swain, R.L.; Hutton, J.T.; Thomas, D.L.

    1989-01-01

    A computer-controlled system consisting of a servohydraulic test machine, an in-house designed test controller, and a desktop computer has been developed for performing automated fracture toughness and fatigue crack growth testing both in the laboratory and in hot cells for remote testing of irradiated specimens. Both unloading compliance and dc-potential drop can be used to monitor crack growth. The test controller includes a dc-current supply programmer, a function generator for driving the servohydraulic test machine to required test outputs, five measurement channels (each consisting of low-pass filter, track/hold amplifier, and 16-bit analog-to-digital converter), and digital logic for various control and data multiplexing functions. The test controller connects to the computer via a 16-bit wide photo-isolated bidirectional bus. The computer, a Hewlett-Packard series 200/300, inputs specimen and test parameters from the operator, configures the test controller, stores test data from the test controller in memory, does preliminary analysis during the test, and records sensor calibrations, specimen and test parameters, and test data on flexible diskette for later recall and analysis with measured initial and final crack length information. During the test, the operator can change test parameters as necessary. 24 refs., 6 figs

  3. Material control system design: Test Bed Nitrate Storage Area (TBNSA)

    International Nuclear Information System (INIS)

    Clark, G.A.; Da Roza, R.A.; Dunn, D.R.; Sacks, I.J.; Harrison, W.; Huebel, J.G.; Ross, W.N.; Salisbury, J.D.; Sanborn, R.H.; Weissenberger, S.

    1978-05-01

    This report provides an example of a hypothetical Special Nuclear Material (SNM) Safeguard Material Control and Accounting (MC and A) System which will be used as a subject for the demonstration of the Lawrence Livermore Laboratory MC and A System Evaluation Methodology in January 1978. This methodology is to become a tool in the NRC evaluation of license applicant submittals for Nuclear Fuel Cycle facilities. The starting point for this test bed design was the Allied-General Nuclear Services--Barnwell Nuclear Fuel Plant Reprocessing plant as described in the Final Safety Analysis Report (FSAR), of August 1975. The test bed design effort was limited to providing an SNM safeguard system for the plutonium nitrate storage area of this facility

  4. System maintenance test plan for the TWRS controlled baseline database system

    International Nuclear Information System (INIS)

    Spencer, S.G.

    1998-01-01

    TWRS [Tank Waste Remediation System] Controlled Baseline Database, formally known as the Performance Measurement Control System, is used to track and monitor TWRS project management baseline information. This document contains the maintenance testing approach for software testing of the TCBD system once SCR/PRs are implemented

  5. The Test of LLRF control system on superconducting cavity

    OpenAIRE

    Zhu, Zhenglong; Wang, Xianwu; Wen, Lianghua; Chang, Wei; Zhang, Ruifeng; Gao, Zheng; Chen, Qi

    2014-01-01

    The first generation Low-Level radio frequency(LLRF) control system independently developed by IMPCAS, the operating frequency is 162.5MHz for China ADS, which consists of superconducting cavity amplitude stability control, phase stability control and the cavity resonance frequency control. The LLRF control system is based on four samples IQ quadrature demodulation technique consisting an all-digital closed-loop feedback control. This paper completed the first generation of ADS LLRF control s...

  6. Test, Control and Monitor System (TCMS) operations plan

    Science.gov (United States)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  7. Tank Monitoring and Control System (TMACS) Acceptance Test Procedure

    International Nuclear Information System (INIS)

    HOLM, M.J.

    1999-01-01

    This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver devices. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab

  8. PWR primary system chemistry control during hot functional testing

    International Nuclear Information System (INIS)

    Reid, Richard D.; Little, Michael J.

    2014-01-01

    Hot Functional Testing (HFT) involves a number of pre-operational exercises performed to confirm the operability of plant systems at conditions expected during both normal and off-normal operation of a pressurized water reactor (PWR), including operability of safety systems. While the primary purposes of HFT are to demonstrate operability of plant systems and satisfy regulatory requirements, chemistry control during HFT is important to long-term integrity and performance of plant systems. Specifically, HFT is the first time plant equipment is exposed to high temperature water and the chemistry maintained during HFT can impact the passivation layers that form on wetted surfaces and long-term release of metals from these surfaces. Metals released from the inner surfaces of steam generator tubing and reactor coolant loop piping become activated in the core and can redeposit on ex-core surfaces. Because HFT is performed before fuel is loaded in the core, HFT provides an opportunity to produce a passive layer on primary surfaces that is free of activated corrosion products, resistant to metals release during subsequent plant operation, and also resistant to incorporation of activated corrosion products (once fuel is loaded in the core). Thus, maintaining desirable primary chemistry control during HFT is important for source term management, minimization of future shutdown activity releases, minimization of dose rates, and asset preservation. This paper presents an overview of passive film formation in the austenitic stainless steel and high nickel alloys that make up the majority of the primary circuit in advanced PWR designs. Based on this information, a summary is provided of the effects on passive film formation of key chemistry parameters that may be controlled during HFT. (author)

  9. Test and control computer user's guide for a digital beam former test system

    Science.gov (United States)

    Alexovich, Robert E.; Mallasch, Paul G.

    1992-01-01

    A Digital Beam Former Test System was developed to determine the effects of noise, interferers and distortions, and digital implementations of beam forming as applied to the Tracking and Data Relay Satellite 2 (TDRS 2) architectures. The investigation of digital beam forming with application to TDRS 2 architectures, as described in TDRS 2 advanced concept design studies, was conducted by the NASA/Lewis Research Center for NASA/Goddard Space Flight Center. A Test and Control Computer (TCC) was used as the main controlling element of the digital Beam Former Test System. The Test and Control Computer User's Guide for a Digital Beam Former Test System provides an organized description of the Digital Beam Former Test System commands. It is written for users who wish to conduct tests of the Digital Beam forming Test processor using the TCC. The document describes the function, use, and syntax of the TCC commands available to the user while summarizing and demonstrating the use of the commands wtihin DOS batch files.

  10. 14 CFR 417.305 - Command control system testing.

    Science.gov (United States)

    2010-01-01

    ....303 are satisfied. (4) Any computing system, software, or firmware that performs a software safety... following: (i) Automatic carrier switching. For any automatic carrier switching system, the test must verify...

  11. Comparative tests of bench equipment for fuel control system testing of gas-turbine engine

    Science.gov (United States)

    Shendaleva, E. V.

    2018-04-01

    The relevance of interlaboratory comparative researches is confirmed by attention of world metrological community to this field of activity. Use of the interlaboratory comparative research methodology not only for single gages collation, but also for bench equipment complexes, such as modeling stands for fuel control system testing of gas-turbine engine, is offered. In this case a comparative measure of different bench equipment will be the control fuel pump. Ensuring traceability of measuring result received at test benches of various air enterprises, development and introduction of national standards to practice of bench tests and, eventually, improvement of quality and safety of a aircraft equipment is result of this approach.

  12. Test and Evaluation Station (TESt) - A Control System for the ALICE-HMPID Liquid Distribution Prototype

    CERN Document Server

    Maatta, E; CERN. Geneva; Swoboda, Detlef; Lecoeur, G

    1999-01-01

    The sub-detectors and systems in the ALICE experiment [1] are of various types. However, during physics runs, all devices necessary for the operation of the detector must be accessible and controllable through a common computer interface. Throughout all other periods each sub-detector requires maintenance, upgrading or test operation. To this end, an access independant of other sub-detectors must be guaranteed. These basic requirements impose a fair number of constraints on the architecture and components of the Detector Control System (DCS). The purpose of the TESt project consisted in the construction of a stand alone unit for a specific sub-system of an ALICE detector in order to gain first experience with commercial products for detector control. Although the control system includes only a small number of devices and is designed for a particular application, it covers nevertheless all layers of a complete system and can be extended or used in different applications. The control system prototype has been...

  13. Computer control system for sup 6 sup 0 Co industrial DR nondestructive testing system

    CERN Document Server

    Chen Hai Jun

    2002-01-01

    The author presents the application of sup 6 sup 0 Co industrial DR nondestructive testing system, which including the control of step-motor, electrical protection, computer monitor program. The computer control system has good performance, high reliability and cheap expense

  14. SPECT quality control tests

    International Nuclear Information System (INIS)

    Robilotta, C.C.; Rebelo, M.F.S.; Oliveira, M.A.; Abe, R.

    1987-01-01

    Quality control tests of tomographic system composed by a rotatory chamber (CGR Gammatomome T-9000) and a microcomputer are presented. Traditional quality control tests for scintilation chambers and specific tests for tomographic systems are reported. (M.A.C.) [pt

  15. Air pollution control system testing at the DOE offgas components test facility

    International Nuclear Information System (INIS)

    Burns, D.B.; Speed, D.; VanPelt, W.; Burns, H.H.

    1997-01-01

    In 1997, the Department of Energy (DOE) Savannah River Site (SRS) plans to begin operation of the Consolidated Incineration Facility (CIF) to treat solid and liquid RCRA hazardous and mixed wastes. The Savannah River Technology Center (SRTC) leads an extensive technical support program designed to obtain incinerator and air pollution control equipment performance data to support facility start-up and operation. A key component of this technical support program includes the Offgas Components Test Facility (OCTF), a pilot-scale offgas system test bed. The primary goal for this test facility is to demonstrate and evaluate the performance of the planned CIF Air Pollution Control System (APCS). To accomplish this task, the OCTF has been equipped with a 1/10 scale CIF offgas system equipment components and instrumentation. In addition, the OCTF design maximizes the flexibility of APCS operation and facility instrumentation and sampling capabilities permit accurate characterization of all process streams throughout the facility. This allows APCS equipment performance to be evaluated in an integrated system under a wide range of possible operating conditions. This paper summarizes the use of this DOE test facility to successfully demonstrate APCS operability and maintainability, evaluate and optimize equipment and instrument performance, and provide direct CIF start-up support. These types of facilities are needed to permit resolution of technical issues associated with design and operation of systems that treat and dispose combustible hazardous, mixed, and low-level radioactive waste throughout and DOE complex

  16. TREAT [Transient Reactor Test Facility] reactor control rod scram system simulations and testing

    International Nuclear Information System (INIS)

    Solbrig, C.W.; Stevens, W.W.

    1990-01-01

    Air cylinders moving heavy components (100 to 300 lbs) at high speeds (above 300 in/sec) present a formidable end-cushion-shock problem. With no speed control, the moving components can reach over 600 in/sec if the air cylinder has a 5 ft stroke. This paper presents an overview of a successful upgrade modification to an existing reactor control rod drive design using a computer model to simulate the modified system performance for system design analysis. This design uses a high speed air cylinder to rapidly insert control rods (278 lb moved 5 ft in less than 300 msec) to scram an air-cooled test reactor. Included is information about the computer models developed to simulate high-speed air cylinder operation and a unique new speed control and end cushion design. A patent application is pending with the US Patent ampersand Trade Mark Office for this system (DOE case number S-68,622). The evolution of the design, from computer simulations thru operational testing in a test stand (simulating in-reactor operating conditions) to installation and use in the reactor, is also described. 6 figs

  17. Wind Tunnel Testing of Active Control System for Bridges

    DEFF Research Database (Denmark)

    Hansen, Henriette I.; Thoft-Christensen, Palle

    This paper describes preparation of wind tunnel testing of the principle of using flaps to control the motion of suspension bridges. The experiment will take place at the Instituto Superior Technico Lisbon, Portugal. The bridge section model is constructed of foam with an aluminium frame. The flaps...... are regulated by servo motors. Neural networks are used to position the flaps in the optimal positions....

  18. Preliminary Test of Adaptive Neuro-Fuzzy Inference System Controller for Spacecraft Attitude Control

    Directory of Open Access Journals (Sweden)

    Sung-Woo Kim

    2012-12-01

    Full Text Available The problem of spacecraft attitude control is solved using an adaptive neuro-fuzzy inference system (ANFIS. An ANFIS produces a control signal for one of the three axes of a spacecraft’s body frame, so in total three ANFISs are constructed for 3-axis attitude control. The fuzzy inference system of the ANFIS is initialized using a subtractive clustering method. The ANFIS is trained by a hybrid learning algorithm using the data obtained from attitude control simulations using state-dependent Riccati equation controller. The training data set for each axis is composed of state errors for 3 axes (roll, pitch, and yaw and a control signal for one of the 3 axes. The stability region of the ANFIS controller is estimated numerically based on Lyapunov stability theory using a numerical method to calculate Jacobian matrix. To measure the performance of the ANFIS controller, root mean square error and correlation factor are used as performance indicators. The performance is tested on two ANFIS controllers trained in different conditions. The test results show that the performance indicators are proper in the sense that the ANFIS controller with the larger stability region provides better performance according to the performance indicators.

  19. Flight testing a propulsion-controlled aircraft emergency flight control system on an F-15 airplane

    Science.gov (United States)

    Burcham, F. W., Jr.; Burken, John; Maine, Trindel A.

    1994-01-01

    Flight tests of a propulsion-controlled aircraft (PCA) system on an F-15 airplane have been conducted at the NASA Dryden Flight Research Center. The airplane was flown with all flight control surfaces locked both in the manual throttles-only mode and in an augmented system mode. In the latter mode, pilot thumbwheel commands and aircraft feedback parameters were used to position the throttles. Flight evaluation results showed that the PCA system can be used to land an airplane that has suffered a major flight control system failure safely. The PCA system was used to recover the F-15 airplane from a severe upset condition, descend, and land. Pilots from NASA, U.S. Air Force, U.S. Navy, and McDonnell Douglas Aerospace evaluated the PCA system and were favorably impressed with its capability. Manual throttles-only approaches were unsuccessful. This paper describes the PCA system operation and testing. It also presents flight test results and pilot comments.

  20. Low Pressure Circuit Control and adjust System Test

    International Nuclear Information System (INIS)

    Rubio, R.O; Brendstrup, C.J; Ocampo, A.C

    2000-01-01

    The hydraulic mechanism (MSAC) is a system that will be employed in the movement of the control rods of the CAREM-25 reactor.In this report, the experimental work on a prototype of MSAC in a low pressure circuit is presented: also the methodology and conclusions.Basic thermalhydraulic data from the MSAC was obtained, and the most relevant control parameters were determined.The response of the mechanism to changes in the control parameters was also evaluated. In conclusion, the response of the MSAC fulfills the aspects of reliability and repetitive movement with water flow pulses control, in the low pressure circuit at the Laboratorio de Mecanica, Materiales y Mediciones of INVAP S.E

  1. 46 CFR 122.320 - Steering gear, controls, and communication system tests.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Steering gear, controls, and communication system tests... communication system tests. The master of a vessel shall have examined and tested the steering gear, signaling whistle, propulsion controls, and communication systems of the vessel prior to getting underway for a...

  2. Computer-controlled environmental test systems - Criteria for selection, installation, and maintenance.

    Science.gov (United States)

    Chapman, C. P.

    1972-01-01

    Applications for presently marketed, new computer-controlled environmental test systems are suggested. It is shown that capital costs of these systems follow an exponential cost function curve that levels out as additional applications are implemented. Some test laboratory organization changes are recommended in terms of new personnel requirements, and facility modification are considered in support of a computer-controlled test system. Software for computer-controlled test systems are discussed, and control loop speed constraints are defined for real-time control functions. Suitable input and output devices and memory storage device tradeoffs are also considered.

  3. Evaluation of the control system checkout test results for YGN 3

    International Nuclear Information System (INIS)

    Hong, Eon Young; Shon, Suk Whun; Kim, Shim Whan; Sung, Kang Sik; Seo, Jong Tae.

    1996-11-01

    During the Yonggwang Nuclear Power Plant Unit 3 (YGN3) Power Ascension Test (PAT) period, the Control System Checkout tests were performed at 10%, 20%, 50%, 80%, and 100% respectively. This test evaluates the performance of the feedwater control system, reactor regulating system, pressurizer level and pressure control system in controlling their respective parameters within specified control bands at different power levels. The first test evaluates the ability of the FWCS to control steam generator 1 and 2 water levels during steady and transient conditions. The SG level setpoint was changed from normal SG level. The FWCS no.1 and no.2 controlled the SG water level to the new setpoint within the acceptable band. The second test evaluates the ability of the reactor regulating system (RRS) to control reactor coolant system (RCS) average temperature with respect to the reference temperature. The final test evaluates the ability of all of the control systems to work in an integrated manner controlling their respective parameters while the plant is at steady state conditions. The FWCS, RRS, SBCS, PLCS control their respective parameters within the control bands. The tests performed at Unit 3 were successful by meeting all of the test acceptable criteria. The measured test data for the major plant parameters were collected and evaluated. (author). 14 tabs., 217 figs., 7 refs

  4. Automated real-time testing (ARTT) for embedded control systems (ECS)

    International Nuclear Information System (INIS)

    Hawkins, J; Howard, R; Nguyen, H.

    2001-01-01

    Many of today's automated real-time testing systems for embedded systems were developed using expensive custom hardware and software. In this article they describe how to use commercially available off-the-shelf hardware and software to design and develop an automated real-time test systems for Embedded Programmable Logic Controller (PLC) Based Control Systems. The system development began with the implementation of the VALI/TEST Pro testing methodology as a means for structuring the testing. Using this methodology, they were able to decompose system requirement documents for a Personnel Safety System (PSS) into its high, intermediate and detail level requirements. next, the validation procedures for the PSS system were decomposed into testing units called builds, test runs and test cases. To measure the PSS system's test coverage three levels of system requirements were mapped to their respective unit level of test using a specially constructed validation matrix that was designed to handle over 150 test cases and requirements. All of the above work led to the development of an Automated Real-Time Test System (ARTTS) that is capable of performing complete black box testing in real-time for Embedded PLC Based Control Systems. Also note, that the PSS system under test and mentioned in this paper is located at the Advance Photon Source (APS) at Argonne National Laboratory Basic Energy Science Facility in Argonne, Illinois

  5. Real time test bed development for power system operation, control and cyber security

    Science.gov (United States)

    Reddi, Ram Mohan

    The operation and control of the power system in an efficient way is important in order to keep the system secure, reliable and economical. With advancements in smart grid, several new algorithms have been developed for improved operation and control. These algorithms need to be extensively tested and validated in real time before applying to the real electric power grid. This work focuses on the development of a real time test bed for testing and validating power system control algorithms, hardware devices and cyber security vulnerability. The test bed developed utilizes several hardware components including relays, phasor measurement units, phasor data concentrator, programmable logic controllers and several software tools. Current work also integrates historian for power system monitoring and data archiving. Finally, two different power system test cases are simulated to demonstrate the applications of developed test bed. The developed test bed can also be used for power system education.

  6. Testing of the West Valley Vitrification Facility transfer cart control system

    International Nuclear Information System (INIS)

    Halliwell, J.W.; Bradley, E.C.

    1995-01-01

    Oak Ridge National Laboratory (ORNL) has designed and tested the control system for the West Valley Demonstration Project Vitrification Facility transfer cart. The transfer cart will transfer canisters of vitrified high-level waste remotely within the Vitrification Facility. The control system operates the cart under battery power by wireless control. The equipment includes cart-mounted control electronics, battery charger, control pendants, engineer's console, and facility antennas. Testing was performed in several phases of development: (1) prototype equipment was built and tested during design, (2) board-level testing was then performed at ORNL during fabrication, and (3) system-level testing was then performed by ORNL at the fabrication subcontractor's facility for the completed cart system. These tests verified (1) the performance of the cart relative to design requirements and (2) operation of various built-in cart features. The final phase of testing is planned to be conducted during installation at the West Valley Vitrification Facility

  7. Evaluation of power control concepts using the PMAD systems test bed. [Power Management and Distribution

    Science.gov (United States)

    Beach, R. F.; Kimnach, G. L.; Jett, T. A.; Trash, L. M.

    1989-01-01

    The Lewis Research Center's Power Management and Distribution (PMAD) System testbed and its use in the evaluation of control concepts applicable to the NASA Space Station Freedom electric power system (EPS) are described. The facility was constructed to allow testing of control hardware and software in an environment functionally similar to the space station electric power system. Control hardware and software have been developed to allow operation of the testbed power system in a manner similar to a supervisory control and data acquisition (SCADA) system employed by utility power systems for control. The system hardware and software are described.

  8. Integrating Controls Frameworks: Control Systems for NA62 LAV Detector Test Beams

    CERN Document Server

    Holme, Oliver; Golonka, Piotr; Gonzalez-Berges, Manuel; Milcent, Hervé

    2011-01-01

    The detector control system for the NA62 experiment at CERN, to be ready for physics data-taking in 2014, is going to be built based on control technologies recommended by the CERN Engineering group. A rich portfolio of the technologies is planned to be showcased and deployed in the final application, and synergy between them is needed. In particular two approaches to building controls application need to play in harmony: the use of the high-level application framework called UNICOS, and a bottom-up approach of development based on the components of the JCOP Framework. The aim of combining the features provided by the two frameworks is to avoid duplication of functionality and minimize the maintenance and development effort for future controls applications. In the paper the result of the integration efforts obtained so far are presented; namely the control applications developed for beam-testing of NA62 detector prototypes. Even though the delivered applications are simple, significant conceptual and developm...

  9. INTEGRATING CONTROLS FRAMEWORKS: CONTROL SYSTEMS FOR NA62 LAV DETECTOR TEST BEAMS

    CERN Document Server

    Holme, O; Golonka, P; Gonzalez-Berges, M; Milcent, H

    2011-01-01

    The detector control system for the NA62 experiment at CERN, to be ready for physics data-taking in 2014, is going to be built based on control technologies recommended by the CERN Engineering group. A rich portfolio of the technologies is planned to be showcased and deployed in the final application, and synergy between them is needed. In particular two approaches to building controls application need to play in harmony: the use of the high-level application framework called UNICOS, and a bottom-up approach of development based on the components of the JCOP Framework. The aim of combining the features provided by the two frameworks is to avoid duplication of functionality and minimize the maintenance and development effort for future controls applications. In the paper the result of the integration efforts obtained so far are presented; namely the control applications developed for beam-testing of NA62 detector prototypes. Even though the delivered applications are simple, significant conceptual and developm...

  10. Co-Simulation of Building Energy and Control Systems with the Building Controls Virtual Test Bed

    Energy Technology Data Exchange (ETDEWEB)

    Wetter, Michael

    2010-08-22

    This article describes the implementation of the Building Controls Virtual Test Bed (BCVTB). The BCVTB is a software environment that allows connecting different simulation programs to exchange data during the time integration, and that allows conducting hardware in the loop simulation. The software architecture is a modular design based on Ptolemy II, a software environment for design and analysis of heterogeneous systems. Ptolemy II provides a graphical model building environment, synchronizes the exchanged data and visualizes the system evolution during run-time. The BCVTB provides additions to Ptolemy II that allow the run-time coupling of different simulation programs for data exchange, including EnergyPlus, MATLAB, Simulink and the Modelica modelling and simulation environment Dymola. The additions also allow executing system commands, such as a script that executes a Radiance simulation. In this article, the software architecture is presented and the mathematical model used to implement the co-simulation is discussed. The simulation program interface that the BCVTB provides is explained. The article concludes by presenting applications in which different state of the art simulation programs are linked for run-time data exchange. This link allows the use of the simulation program that is best suited for the particular problem to model building heat transfer, HVAC system dynamics and control algorithms, and to compute a solution to the coupled problem using co-simulation.

  11. Lay out, test verification and in orbit performance of HELIOS a temperature control system

    Science.gov (United States)

    Brungs, W.

    1975-01-01

    HELIOS temperature control system is described. The main design features and the impact of interactions between experiment, spacecraft system, and temperature control system requirements on the design are discussed. The major limitations of the thermal design regarding a closer sun approach are given and related to test experience and performance data obtained in orbit. Finally the validity of the test results achieved with prototype and flight spacecraft is evaluated by comparison between test data, orbit temperature predictions and flight data.

  12. 14 CFR 27.923 - Rotor drive system and control mechanism tests.

    Science.gov (United States)

    2010-01-01

    ... the position that will give maximum longitudinal cyclic pitch change to simulate forward flight. The... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Rotor drive system and control mechanism....923 Rotor drive system and control mechanism tests. (a) Each part tested as prescribed in this section...

  13. 30 CFR 7.103 - Safety system control test.

    Science.gov (United States)

    2010-07-01

    ... Areas of Underground Coal Mines Where Permissible Electric Equipment is Required § 7.103 Safety system... operate immediately when activated and stop the engine within 15 seconds. (6) The total intake air inlet...

  14. Test bed control center design concept for Tank Waste Retrieval Manipulator Systems

    International Nuclear Information System (INIS)

    Sundstrom, E.; Draper, J.V.; Fausz, A.

    1995-01-01

    This paper describes the design concept for the control center for the Single Shell Tank Waste Retrieval Manipulator System test bed and the design process behind the concept. The design concept supports all phases of the test bed mission, including technology demonstration, comprehensive system testing, and comparative evaluation for further development and refinement of the TWRMS for field operations

  15. Operational test procedure for pumping and instrumentation control skid SALW-6001B monitor and control system

    International Nuclear Information System (INIS)

    Garcia, M.F.

    1995-11-01

    This OTP shall verify and document that the monitor and control system comprised of PICS SALW-6001B PLC, 242S PLC, Operator Control Station, and communication network is functioning per operational requirements

  16. Control of quality in the tests of systems of containment of vehicles. Intercomparison of the results of the tests

    International Nuclear Information System (INIS)

    Lopez Ramos, S.

    2009-01-01

    This article tries to offer information on how Central Laboratory of Structures and Materials are made the tests for Marca N of AENOR of the systems of containment of vehicles and its control of external quality. (Author) 15 refs

  17. An Ultra-low Frequency Modal Testing Suspension System for High Precision Air Pressure Control

    Directory of Open Access Journals (Sweden)

    Qiaoling YUAN

    2014-05-01

    Full Text Available As a resolution for air pressure control challenges in ultra-low frequency modal testing suspension systems, an incremental PID control algorithm with dead band is applied to achieve high-precision pressure control. We also develop a set of independent hardware and software systems for high-precision pressure control solutions. Taking control system versatility, scalability, reliability, and other aspects into considerations, a two-level communication employing Ethernet and CAN bus, is adopted to complete such tasks as data exchange between the IPC, the main board and the control board ,and the pressure control. Furthermore, we build a single set of ultra-low frequency modal testing suspension system and complete pressure control experiments, which achieve the desired results and thus confirm that the high-precision pressure control subsystem is reasonable and reliable.

  18. Evaluation of the control system checkout test at 100% power for Yonggwang Nuclear Power Plant Unit 3

    International Nuclear Information System (INIS)

    Kim, Shin Whan; Lee, Joo Han; Baek, Jong Man; Seo, Jong Tae; Lee, Sang Keun; Kang, In Koo; Ju, Hee Wan; Min, Kyung Soo; Kim, Byung Gon

    1995-01-01

    Control system checkout tests at various powers for Yonggwang Nuclear Power Plant Unit 3(YGN3) were performed to demonstrate the accuracies and proper performances of the control systems of the plant. Tested control systems included the feedwater control system, steam bypass control system, reactor regulation system, control element drive mechanism control system, pressurizer level control system, and pressurizer pressure control system. The measured test data during the control system checkout test at 100% power are evaluated. The test results showed that the control systems of YGN 3 properly control system was simulated by using the LTC code which is the performance analysis code for YGN 3 and 4 design. Comparisons of the predicted results with the measured data confirmed that the feedwater control system controls the steam generator level as designed

  19. Tools and methods for implementing the control systems on the Mirror Fusion Test Facility

    International Nuclear Information System (INIS)

    Minor, E.G.; Labiak, W.G.

    1981-01-01

    Installation of the major hardware subsystems for MFTF is nearing completion. These subsystems include the Fusion Chamber System, the eighty KV Neutral Beam System, the Superconducting Magnet System, and the Personnel Safety System. The Local Controls group has undertaken a uniform aproach to implementing the control systems for all of these hardware subsystems. This approach has two major aspects: (1) to provide a stand-alone computer control system with a remote, portable terminal so that computer control can be provided at the site of the hardware for initial testing, (2) to provide hardware simulators so that the complicated MFTF computer control system can be tested independent of the hardware. The software and hardware tools which were developed to carry out this plan will be described. Our experiences with bringing up subsystems containing up to 900 separate channels of control and status will also be described

  20. Waterhammer modeling for the Ares I Upper Stage Reaction Control System cold flow development test article

    Science.gov (United States)

    Williams, Jonathan Hunter

    The Upper Stage Reaction Control System provides in-flight three-axis attitude control for the Ares I Upper Stage. The system design must accommodate rapid thruster firing to maintain proper launch trajectory and thus allow for the possibility to pulse multiple thrusters simultaneously. Rapid thruster valve closure creates an increase in static pressure, known as waterhammer, which propagates throughout the propellant system at pressures exceeding nominal design values. A series of development tests conducted at Marshall Space Flight Center in 2009 were performed using a water-flow test article to better understand fluid characteristics of the Upper Stage Reaction Control System. A subset of the tests examined the waterhammer pressure and frequency response in the flight-representative system and provided data to anchor numerical models. This thesis presents a comparison of waterhammer test results with numerical model and analytical results. An overview of the flight system, test article, modeling and analysis are also provided.

  1. Computer control and data acquisition system for the R.F. Test Facility

    International Nuclear Information System (INIS)

    Stewart, K.A.; Burris, R.D.; Mankin, J.B.; Thompson, D.H.

    1986-01-01

    The Radio Frequency Test Facility (RFTF) at Oak Ridge National Laboratory, used to test and evaluate high-power ion cyclotron resonance heating (ICRH) systems and components, is monitored and controlled by a multicomponent computer system. This data acquisition and control system consists of three major hardware elements: (1) an Allen-Bradley PLC-3 programmable controller; (2) a VAX 11/780 computer; and (3) a CAMAC serial highway interface. Operating in LOCAL as well as REMOTE mode, the programmable logic controller (PLC) performs all the control functions of the test facility. The VAX computer acts as the operator's interface to the test facility by providing color mimic panel displays and allowing input via a trackball device. The VAX also provides archiving of trend data acquired by the PLC. Communications between the PLC and the VAX are via the CAMAC serial highway. Details of the hardware, software, and the operation of the system are presented in this paper

  2. Proportional and Integral Thermal Control System for Large Scale Heating Tests

    Science.gov (United States)

    Fleischer, Van Tran

    2015-01-01

    The National Aeronautics and Space Administration Armstrong Flight Research Center (Edwards, California) Flight Loads Laboratory is a unique national laboratory that supports thermal, mechanical, thermal/mechanical, and structural dynamics research and testing. A Proportional Integral thermal control system was designed and implemented to support thermal tests. A thermal control algorithm supporting a quartz lamp heater was developed based on the Proportional Integral control concept and a linearized heating process. The thermal control equations were derived and expressed in terms of power levels, integral gain, proportional gain, and differences between thermal setpoints and skin temperatures. Besides the derived equations, user's predefined thermal test information generated in the form of thermal maps was used to implement the thermal control system capabilities. Graphite heater closed-loop thermal control and graphite heater open-loop power level were added later to fulfill the demand for higher temperature tests. Verification and validation tests were performed to ensure that the thermal control system requirements were achieved. This thermal control system has successfully supported many milestone thermal and thermal/mechanical tests for almost a decade with temperatures ranging from 50 F to 3000 F and temperature rise rates from -10 F/s to 70 F/s for a variety of test articles having unique thermal profiles and test setups.

  3. A Comprehensive Systems Testing Plan for the Smart Phone Assisted Rapid Communication and Control System (SPARCCS)

    Science.gov (United States)

    2012-09-01

    process. Interface faults can disrupt the functionality of a system ( Pressman , 2010). Interface faults can include: 1. Incorrect interrupt...and software instrumentation for full effectiveness ( Pressman , 2010). In SPARCCS testing, performance testing will be at the forefront of all test...which it is designed to operate. Deployment testing tests the following ( Pressman , 2010): 1. Installation procedures 2. Installation

  4. Automated WWER steam generator eddy current testing and plugging control system

    International Nuclear Information System (INIS)

    Gorecan, I.; Gortan, K.; Grzalja, I.

    2004-01-01

    The structural architecture of the system contains three main components which are described as follows: Manipulator Guidance System; Eddy Current Testing System; Plugging System. The manipulator system has the task to position the end-effectors to the desired tube position. When the final position is reached, the Eddy Current testing system performs data acquisition. In case defects are found, the plugging system performs tube plug installment. Each system is composed of 3 layers. The first layer is the hardware layer consisting of motors driving the effectors along with sensors needed to obtain the positioning data, pusher motors used to push the test probes into tubes of the WWER steam generator, and plugging hardware tool. The second layer is the control box performing basic monitoring and control routines as an interconnection between first and third layer. The highest layer is the control software, running on the PC, which is used as a human-machine-interface.(author)

  5. Development and Operation of an Automatic Rotor Trim Control System for the UH-60 Individual Blade Control Wind Tunnel Test

    Science.gov (United States)

    Theodore, Colin R.; Tischler, Mark B.

    2010-01-01

    An automatic rotor trim control system was developed and successfully used during a wind tunnel test of a full-scale UH-60 rotor system with Individual Blade Control (IBC) actuators. The trim control system allowed rotor trim to be set more quickly, precisely and repeatably than in previous wind tunnel tests. This control system also allowed the rotor trim state to be maintained during transients and drift in wind tunnel flow, and through changes in IBC actuation. The ability to maintain a consistent rotor trim state was key to quickly and accurately evaluating the effect of IBC on rotor performance, vibration, noise and loads. This paper presents details of the design and implementation of the trim control system including the rotor system hardware, trim control requirements, and trim control hardware and software implementation. Results are presented showing the effect of IBC on rotor trim and dynamic response, a validation of the rotor dynamic simulation used to calculate the initial control gains and tuning of the control system, and the overall performance of the trim control system during the wind tunnel test.

  6. A Flight Control System Architecture for the NASA AirSTAR Flight Test Infrastructure

    Science.gov (United States)

    Murch, Austin M.

    2008-01-01

    A flight control system architecture for the NASA AirSTAR infrastructure has been designed to address the challenges associated with safe and efficient flight testing of research control laws in adverse flight conditions. The AirSTAR flight control system provides a flexible framework that enables NASA Aviation Safety Program research objectives, and includes the ability to rapidly integrate and test research control laws, emulate component or sensor failures, inject automated control surface perturbations, and provide a baseline control law for comparison to research control laws and to increase operational efficiency. The current baseline control law uses an angle of attack command augmentation system for the pitch axis and simple stability augmentation for the roll and yaw axes.

  7. Acceptance/Operational Test Report for Tank 241-AN-104 camera and camera purge control system

    International Nuclear Information System (INIS)

    Castleberry, J.L.

    1995-11-01

    This Acceptance/Operational Test Procedure (ATP/OTP) will document the satisfactory operation of the camera purge panel, purge control panel, color camera system and associated control components destined for installation. The final acceptance of the complete system will be performed in the field. The purge panel and purge control panel will be tested for its safety interlock which shuts down the camera and pan-and-tilt inside the tank vapor space during loss of purge pressure and that the correct purge volume exchanges are performed as required by NFPA 496. This procedure is separated into seven sections. This Acceptance/Operational Test Report documents the successful acceptance and operability testing of the 241-AN-104 camera system and camera purge control system

  8. Automated systems help prevent operator error during [reactor] I and C [instrumentation and control] testing

    International Nuclear Information System (INIS)

    Courcoux, R.

    1989-01-01

    On a nuclear steam supply system, even a minor failure can involve actuation of the whole reactor protection system (RPS). To reduce the likelihood of human error leading to unwanted trips during the maintenance of instrumentation and control systems, Framatome has been developing and installing various automated testing systems. Such automated systems are particularly helpful when periodic tests with a potential for RPS actuation have to be carried out, or when the test is on the critical path for the refuelling outage. The Sensitive Channel Programme described is an example of the sort of work that has been done. (author)

  9. Space Station Environmental Control and Life Support System Test Facility at Marshall Space Flight Center

    Science.gov (United States)

    Springer, Darlene

    1989-01-01

    Different aspects of Space Station Environmental Control and Life Support System (ECLSS) testing are currently taking place at Marshall Space Flight Center (MSFC). Unique to this testing is the variety of test areas and the fact that all are located in one building. The north high bay of building 4755, the Core Module Integration Facility (CMIF), contains the following test areas: the Subsystem Test Area, the Comparative Test Area, the Process Material Management System (PMMS), the Core Module Simulator (CMS), the End-use Equipment Facility (EEF), and the Pre-development Operational System Test (POST) Area. This paper addresses the facility that supports these test areas and briefly describes the testing in each area. Future plans for the building and Space Station module configurations will also be discussed.

  10. Causal Tracking Control of a Non-Minimum Phase HIL Transmission Test System

    OpenAIRE

    Wang, Pengfei

    2009-01-01

    The automotive industry has long relied on testing powertrain components in real vehicles, which causes the development process to be slow and expensive. Therefore, hardware in the loop (HIL) testing techniques are increasingly being adopted to develop electronic control units (ECU) for engine and other components of a vehicle. In this thesis, HIL testing system is developed to provide a laboratory testing environment for continuously variable transmissions (CVTs). Two induction motors were u...

  11. Operational test report for the AY-102 Enraf densitometer control and acquisition system

    International Nuclear Information System (INIS)

    Huber, J.H.

    1998-01-01

    On June 2 through June 10, 1998, the AY-102 Tank Densitometer Control and Acquisition System was operationally tested per OTP-320-01 O Revision A-O. The test was performed at the Department of Energy's Hanford Site, 200 East Area, 241-AY Tank Farm. The test validated the functionality of the Enraf 854 ATG Densitometer Gauge and Enraf Control Panel software for use by project W-320, Waste Retrieval Sluicing System (WRSS). The purpose of the test procedure was two fold: (1) to verify the functionality of the Enraf 854 ATG as a Densitometer and (2) to verify the functionality of the Enraf Control Panel Software density acquisition routines. The densitometer was previously acceptance tested per HNF-SD-WM-ATP-077. The software was previously acceptance tested per HNF-1991

  12. The test and control system for high performance digital power supplies of SSRF

    International Nuclear Information System (INIS)

    Tang Junlong; Li Deming; Shen Tianjian

    2009-01-01

    A test and control system was designed to evaluate performance of the digital power supplies for SSRF. The software of serial communication (RS-232) and Ethernet interface was developed with Lab VIEW. The system can perform functions of instrument and power supply control, data acquisition and display, and store data for 24 h. LAN users can access the system and acquire data conveniently. The data are stored in Excel for analysis and establishment of database of digital PS in the future. (authors)

  13. Testing, Performance and Reliability Evaluation of Charge Controllers for Solar Photovoltaic Home Lighting System in India

    OpenAIRE

    Adarsh Kumar; ChandraShekhar Sharma; Dr. Rajesh Kumar; Avinashkumar haldkar

    2016-01-01

    :Charge controller is the most important part of a Solar Photovoltaic Home LightingSystem (SPVHLS) which controls the charging ofbattery from photovoltaic (PV) module and discharging of battery through load. This paper analyzes testresults of fourteen charge controllers (CC) available in Indiaaccording to the Ministry of New and RenewableEnergy (MNRE) specification. The different parameters of charge controllers to be tested arebattery high voltage disconnect (HVD), lo...

  14. Tank Monitor and Control System (TMACS) Rev 11.0 Acceptance Test Review

    Energy Technology Data Exchange (ETDEWEB)

    HOLM, M.J.

    1999-08-25

    The purpose of this document is to describe tests performed to validate Revision 11 of the TMACS Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab.

  15. Tank monitor and control system (TMACS) revision 11 acceptance test procedure

    International Nuclear Information System (INIS)

    HOLM, M.J.

    1999-01-01

    The purpose of this document is to describe tests performed to validate Revision 11 of the Tank Monitor and Control System (TMACS) and verify that the software functions as intended by design. This document is intended to test the software portion of TMACS. The tests will be performed on the development system. The software to be tested is the TMACS knowledge bases (KB) and the I/O driver/services. The development system will not be talking to field equipment; instead, the field equipment is simulated using emulators or multiplexers in the lab

  16. R and D of control system of compact self-bunching RF gun test facility

    International Nuclear Information System (INIS)

    Pang Jian; Pei Yuanji; Huang Guirong; Wang Jinxiang

    2010-01-01

    An experimental device was recently constructed for testing the beam characteristics of a compact self-bunching RF gun at the National Synchrotron Radiation Laboratory. It designs an independent monitor and control system for the experimental device so as not to disturb the operation of 200MeV LINAC. According to the three-level architecture of a general control scheme, the proposed system consists of circuits that execute kernel control, photosignal emission/reception, and switch values input/output, respectively. It performs timing control, device status monitoring as well as interlock protection, and it can be remotely operated with the assistance of PC software. Testing results show that our system achieves the specified performance and meets the requirement of experimental device stably and reliably. Our proposed system can also be applied to control other small-scale accelerators. (authors)

  17. Modeling and fuzzy control of the engine coolant conditioning system in an IC engine test bed

    International Nuclear Information System (INIS)

    Mohtasebi, Seyed Saeid; Shirazi, Farzad A.; Javaheri, Ahmad; Nava, Ghodrat Hamze

    2010-01-01

    Mechanical and thermodynamical performance of internal combustion engines is significantly affected by the engine working temperature. In an engine test bed, the internal combustion engines are tested in different operating conditions using a dynamometer. It is required that the engine temperature be controlled precisely, particularly in transient states. This precise control can be achieved by an engine coolant conditioning system mainly consisting of a heat exchanger, a control valve, and a controller. In this study, constitutive equations of the system are derived first. These differential equations show the second- order nonlinear time-varying dynamics of the system. The model is validated with the experimental data providing satisfactory results. After presenting the dynamic equations of the system, a fuzzy controller is designed based on our prior knowledge of the system. The fuzzy rules and the membership functions are derived by a trial and error and heuristic method. Because of the nonlinear nature of the system the fuzzy rules are set to satisfy the requirements of the temperature control for different operating conditions of the engine. The performance of the fuzzy controller is compared with a PI one for different transient conditions. The results of the simulation show the better performance of the fuzzy controller. The main advantages of the fuzzy controller are the shorter settling time, smaller overshoot, and improved performance especially in the transient states of the system

  18. Heading Control System for a Multi-body Vehicle with a Virtual Test Driver

    Directory of Open Access Journals (Sweden)

    POSTALCIOGLU OZGEN, S.

    2010-08-01

    Full Text Available This paper includes a Heading Control (HC system for a multi-body vehicle. HC system helps reducing the required torque from the driver and improves the lane keeping efficiency. HC system is important for safety and driver comfort in traffic. The controller performance is examined on a virtual test drive platform. The optimal control theory is applied to HC system and examined on a curved path and under a side wind disturbance. Different assistance levels are applied to see the characteristics of the controller with different virtual test drivers. The results are analyzed based on three performance indices; lane keeping performance (LKP index, assist torque performance (ATP index and driver torque performance (DTP index. As seen from the results while using HC system the lateral displacement decreases as the lane keeping performance increases and the driver torque performance decreases as the assist torque performance increases.

  19. Testing and Quality Assurance of the Control System During NIF Commissioning

    International Nuclear Information System (INIS)

    Casavant, D.; Carey, R.; Cline, B.; Lagin, L.; Ludwigsen, P.; Reddi, U.; Van Arsdall, P.

    2003-01-01

    The strategy used to develop the National Ignition Facility Integrated Computer Control System (NIF ICCS) calls for incremental cycles of construction and formal test to deliver nearly one million lines of code. Software releases that implement specific functionality are approved for deployment when offline tests conducted in the ICCS Integration and Test Facility verify functional, performance and interface requirements using test procedures derived from system requirements. At this stage of the project the controls team has delivered approximately 3/4 of the planned software by performing dozens of development and test cycles within offline test facilities and followed by online tests to confirm integrated operation in the NIF. Test incidents are recorded and tracked from development to successful deployment by the verification team, with hardware and software changes approved by the appropriate change control board. Project metrics are generated by the Software Quality Assurance manager and monitored by ICCS management. Test results are summarized and reported to responsible individuals and Project managers under a work authorization and permit process that assesses risk and evaluates control system upgrade readiness. NIF is well into the first phases of its laser commissioning program to characterize and operate the first four laser beams and target systems. The integrated control system has successfully fired over 100 coordinated shots into beam diagnostics and an initial set of target diagnostics in the 10-m diameter target chamber. Extensive experience has been gained by integrating controls in prototype laboratories and in the NIF. This paper will discuss NIF's software QC and QA processes, capabilities of offline test facilities, and metrics collection

  20. Testing and Quality Assurance of the Control System During NIF Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Casavant, D; Carey, R; Cline, B; Lagin, L; Ludwigsen, P; Reddi, U; Van Arsdall, P

    2003-10-13

    The strategy used to develop the National Ignition Facility Integrated Computer Control System (NIF ICCS) calls for incremental cycles of construction and formal test to deliver nearly one million lines of code. Software releases that implement specific functionality are approved for deployment when offline tests conducted in the ICCS Integration and Test Facility verify functional, performance and interface requirements using test procedures derived from system requirements. At this stage of the project the controls team has delivered approximately 3/4 of the planned software by performing dozens of development and test cycles within offline test facilities and followed by online tests to confirm integrated operation in the NIF. Test incidents are recorded and tracked from development to successful deployment by the verification team, with hardware and software changes approved by the appropriate change control board. Project metrics are generated by the Software Quality Assurance manager and monitored by ICCS management. Test results are summarized and reported to responsible individuals and Project managers under a work authorization and permit process that assesses risk and evaluates control system upgrade readiness. NIF is well into the first phases of its laser commissioning program to characterize and operate the first four laser beams and target systems. The integrated control system has successfully fired over 100 coordinated shots into beam diagnostics and an initial set of target diagnostics in the 10-m diameter target chamber. Extensive experience has been gained by integrating controls in prototype laboratories and in the NIF. This paper will discuss NIF's software QC and QA processes, capabilities of offline test facilities, and metrics collection.

  1. A test system and supervisory control and data acquisition application with programmable logic controller for thermoelectric generators

    International Nuclear Information System (INIS)

    Ahiska, Rasit; Mamur, Hayati

    2012-01-01

    Highlights: ► A new TEG test measurement system with the PLC has been carried out. ► A new SCADA program has been written and tested for the test measurement system. ► An operator panel has been used for monitoring to the instant TEG data. ► All of the measurement data of TEG have been aggregated in the system. - Abstract: In this study, a new test measurement system and supervisory control and data acquisition application with programmable logic controller has been carried out to be enable the collection of the data of thermoelectric generator for the usage of thermoelectric modules as thermoelectric generator. During the production of the electric energy from the thermoelectric generator, the temperatures of the surfaces of the thermoelectric generator, current–voltage values obtained from output of the thermoelectric generator, hot and cold flows have been measured by the newly established system instantly. All these data have been monitored continuously from the computer and recorded by a supervisory control and data acquisition program. At the same time, in environments where there was no computer, an operator panel with the ability to communicate with the programmable logic controller has been added for the monitoring of the instant thermoelectric generator data. All of the measurement data of the thermoelectric generator have been aggregated in the new test measurement and supervisory control and data acquisition system. The setup test measurement system has been implemented on the thermoelectric generator system with about 10 W. Thermoelectric generators, Altec-GM-1 brand-coded have been examined by the new proposed test measurement system and the values of maximum power and thermoelectric generator efficiency were calculated by the programmable logic controller. When the obtained results were compared with the datasheets, the relative error for the maximum power was around 4% and the value for efficiency was below 3%.

  2. Study on anti-seismic test of control rod driving system suspended by magnetic force

    International Nuclear Information System (INIS)

    Zhang Zhihua; Qian Dazhi; Xu Xianqi; Huang Hongwen; Zhang Zhengming; Wu Xinxin; Hu Xiao

    2012-01-01

    To verify the stability, reliability and security function in extreme conditions, the anti-seismic test of control rod drive line was conducted. Drop-time of control rod drive line in different earthquake intensities was got. The response and strain values of control rod drive line acceleration on SL-1, SL-2 level were measured. Safety functions of control rod drive line were validated in different work conditions. Anti-seismic test data shows that the driving system can keep the structure's integrality and realize operation function under OBE and SSE. (authors)

  3. Study on control characteristics for HTTR hydrogen production system with mock-up test facility

    International Nuclear Information System (INIS)

    Inaba, Yoshitomo; Ohashi, Hirofumi; Nishihara, Tetsuo; Sato, Hiroyuki; Inagaki, Yoshiyuki; Takeda, Tetsuaki; Hayashi, Koji; Takada, Shoji

    2005-01-01

    The Japan Atomic Energy Research Institute has a demonstration test plan of a hydrogen production system by steam reforming of methane coupling with the High-Temperature Engineering Test Reactor (HTTR). Prior to the coupling of a hydrogen production plant with the HTTR, simulation tests with a mock-up test facility of the HTTR hydrogen production system (HTTR-H2) is underway. The test facility is a 1/30-scale of the HTTR-H2 and simulates key components downstream from an intermediate heat exchanger of the HTTR. The main objective of the simulation tests is the establishment and demonstration of control technology, focusing on the mitigation of a thermal disturbance to the reactor by a steam generator (SG) and on the controllability of the pressure difference between the helium and process gases at the reaction tube in a steam reformer (SR). It was confirmed that the fluctuation of the outlet helium gas temperature at the SG and the pressure difference in the SR can be controlled within the allowable range for the HTTR-H2 in the case of the system controllability test for the fluctuation of chemical reaction. In addition, a dynamic simulation code for the HTTR-H2 was verified with the obtained test data

  4. System Design Description for the SY-101 Hydrogen Mitigation Test Project Data Acquisition and Control System (DACS-1)

    Energy Technology Data Exchange (ETDEWEB)

    ERMI, A.M.

    2000-01-24

    This document describes the hardware and software of the computer subsystems for the Data Acquisition and Control System (DACS) used in mitigation tests conducted on waste tank 241-SY-101 at the Hanford Nuclear Reservation.

  5. Flight Test Implementation of a Second Generation Intelligent Flight Control System

    Science.gov (United States)

    Williams-Hayes, Peggy S.

    2005-01-01

    The NASA F-15 Intelligent Flight Control System project team has developed a series of flight control concepts designed to demonstrate the benefits of a neural network-based adaptive controller. The objective of the team was to develop and flight-test control systems that use neural network technology, to optimize the performance of the aircraft under nominal conditions, and to stabilize the aircraft under failure conditions. Failure conditions include locked or failed control surfaces as well as unforeseen damage that might occur to the aircraft in flight. The Intelligent Flight Control System team is currently in the process of implementing a second generation control scheme, collectively known as Generation 2 or Gen 2, for flight testing on the NASA F-15 aircraft. This report describes the Gen 2 system as implemented by the team for flight test evaluation. Simulation results are shown which describe the experiment to be performed in flight and highlight the ways in which the Gen 2 system meets the defined objectives.

  6. Selected Flight Test Results for Online Learning Neural Network-Based Flight Control System

    Science.gov (United States)

    Williams-Hayes, Peggy S.

    2004-01-01

    The NASA F-15 Intelligent Flight Control System project team developed a series of flight control concepts designed to demonstrate neural network-based adaptive controller benefits, with the objective to develop and flight-test control systems using neural network technology to optimize aircraft performance under nominal conditions and stabilize the aircraft under failure conditions. This report presents flight-test results for an adaptive controller using stability and control derivative values from an online learning neural network. A dynamic cell structure neural network is used in conjunction with a real-time parameter identification algorithm to estimate aerodynamic stability and control derivative increments to baseline aerodynamic derivatives in flight. This open-loop flight test set was performed in preparation for a future phase in which the learning neural network and parameter identification algorithm output would provide the flight controller with aerodynamic stability and control derivative updates in near real time. Two flight maneuvers are analyzed - pitch frequency sweep and automated flight-test maneuver designed to optimally excite the parameter identification algorithm in all axes. Frequency responses generated from flight data are compared to those obtained from nonlinear simulation runs. Flight data examination shows that addition of flight-identified aerodynamic derivative increments into the simulation improved aircraft pitch handling qualities.

  7. International Space Station Environmental Control and Life Support System Acceptance Testing for Node 1 Temperature and Humidity Control Subsystem

    Science.gov (United States)

    Williams, David E.

    2011-01-01

    The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Storage (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper will provide a summary of the Node 1 ECLS THC subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for this subsystem.The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Storage (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper will provide a summary of the Node 1 ECLS THC subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for this subsystem.

  8. Space Station Freedom environmental control and life support system phase 3 simplified integrated test detailed report

    Science.gov (United States)

    Roberts, B. C.; Carrasquillo, R. L.; Dubiel, M. Y.; Ogle, K. Y.; Perry, J. L.; Whitley, K. M.

    1990-01-01

    A description of the phase 3 simplified integrated test (SIT) conducted at the Marshall Space Flight Center (MSFC) Core Module Integration Facility (CMIF) in 1989 is presented. This was the first test in the phase 3 series integrated environmental control and life support systems (ECLSS) tests. The basic goal of the SIT was to achieve full integration of the baseline air revitalization (AR) subsystems for Space Station Freedom. Included is a description of the SIT configuration, a performance analysis of each subsystem, results from air and water sampling, and a discussion of lessons learned from the test. Also included is a full description of the preprototype ECLSS hardware used in the test.

  9. International Space Station Environmental Control and Life Support System Acceptance Testing for Node 1 Atmosphere Control and Supply Subsystem

    Science.gov (United States)

    Williams, David E.

    2009-01-01

    The International Space Station (ISS) Node 1 Environmental Control and Life Support (ECLS) System is comprised of five subsystems: Atmosphere Control and Supply (ACS), Atmosphere Revitalization (AR), Fire Detection and Suppression (FDS), Temperature and Humidity Control (THC), and Water Recovery and Management (WRM). This paper provides a summary of the Node 1 ECLS ACS subsystem design and a detailed discussion of the ISS ECLS Acceptance Testing methodology utilized for that subsystem.

  10. A modular and extensible data acquisition and control system for testing superconducting magnets

    International Nuclear Information System (INIS)

    Darryl F. Orris and Ruben H. Carcagno

    2001-01-01

    The Magnet Test Facility at Fermilab tests a variety of full-scale and model superconducting magnets for both R and D and production. As the design characteristics and test requirements of these magnets vary widely, the magnet test stand must accommodate a wide range of Data Acquisition (DAQ) and Control requirements. Such a system must provide several functions, which includes: quench detection, quench protection, power supply control, quench characterization, and slow DAQ of temperature, mechanical strain gauge, liquid helium level, etc. The system must also provide cryogenic valve control, process instrumentation monitoring, and process interlock logic associated with the test stand. A DAQ and Control system architecture that provides the functionality described above has been designed, fabricated, and put into operation. This system utilizes a modular approach that provides both extensibility and flexibility. As a result, the complexity of the hardware is minimized while remaining optimized for future expansion. The architecture of this new system is presented along with a description of the different technologies applied to each module. Commissioning and operating experience as well as plans for future expansion are discussed

  11. Computer system requirements specification for 101-SY hydrogen mitigation test project data acquisition and control system (DACS-1)

    International Nuclear Information System (INIS)

    McNeece, S.G.; Truitt, R.W.

    1994-01-01

    The system requirements specification for SY-101 hydrogen mitigation test project (HMTP) data acquisition and control system (DACS-1) documents the system requirements for the DACS-1 project. The purpose of the DACS is to provide data acquisition and control capabilities for the hydrogen mitigation testing of Tank SY-101. Mitigation testing uses a pump immersed in the waste, directed at varying angles and operated at different speeds and time durations. Tank and supporting instrumentation is brought into the DACS to monitor the status of the tank and to provide information on the effectiveness of the mitigation test. Instrumentation is also provided for closed loop control of the pump operation. DACS is also capable for being expanded to control and monitor other mitigation testing. The intended audience for the computer system requirements specification includes the SY-101 hydrogen mitigation test data acquisition and control system designers: analysts, programmers, instrument engineers, operators, maintainers. It is intended for the data users: tank farm operations, mitigation test engineers, the Test Review Group (TRG), data management support staff, data analysis, Hanford data stewards, and external reviewers

  12. Methodology for testing a system for remote monitoring and control on auxiliary machines in electric vehicles

    Directory of Open Access Journals (Sweden)

    Dimitrov Vasil

    2017-01-01

    Full Text Available A laboratory system for remote monitoring and control of an asynchronous motor controlled by a soft starter and contemporary measuring and control devices has been developed and built. This laboratory system is used for research and in teaching. A study of the principles of operation, setting up and examination of intelligent energy meters, soft starters and PLC has been made as knowledge of the relevant software products is necessary. This is of great importance because systems for remote monitoring and control of energy consumption, efficiency and proper operation of the controlled objects are very often used in different spheres of industry, in building automation, transport, electricity distribution network, etc. Their implementation in electric vehicles for remote monitoring and control on auxiliary machines is also possible and very useful. In this paper, a methodology of tests is developed and some experiments are presented. Thus, an experimental verification of the developed methodology is made.

  13. Justification of Technical System Control in Developing and Testing Objects of Missile and Space Technology

    Directory of Open Access Journals (Sweden)

    A. A. Fedorovskiy

    2015-01-01

    Full Text Available Tests in general lifecycle of missile and space technology, play a special role. The high cost of such products and a little time for creation and refinement, allow only a limited number of tests. Justification of the appropriate number of tests and finding the ways to reduce it are important from the practical point of view.When the appropriate number of field tests is impossible to implement, as well as if full or partial realization of the sample operation conditions is impossible the authors propose to use software with the involvement of previously obtained aprioristic information to have the modeling results of the functioning sample or its parts, according to the reliability and quality standards.Involvement of statistical methods for systems and objects of the missile and space equipment is limited to the single number of the carried-out tests. Currently used models and methods for systems of missile and barreled weapon do not allow us to conduct analysis and provide guidance on emerging issues of concern to ensure the quality and reliability of objects of the missile and space equipment by results of tests.The method of probabilistic and statistical analysis of the stochastic system operability is supposed to be used to solve a problem of the planning tests, assessment and control of reliability of technical systems at tests using aprioristic calculated and experimental information. This method makes it possible to relate the number of tests, required to prove the desirable level of reliability, to different types of constructional, functional, structural reserves of the system, as well as the level of information-and-measuring base and the completeness of available information.Thus, the structure of controlled elements, their importance, and acceptance conditions including elaboration of actions and recommendations to eliminate discrepancies in controlled parameters and improve quality of the considered system are justified and formed

  14. Tension test system for irradiated small specimens operated by remote control

    International Nuclear Information System (INIS)

    Okada, Akira

    1993-01-01

    A robot-based tension test system has been developed to aid in the mechanical testing of highly radioactive specimens. This system reduces radiation hazards from specimens and allows for the uniform precision of testing results independent of experimenters' skills. The robot system is designed to accommodate a miniaturized tension specimen with a gage section 5.5 by 1.2 mm, with a total length and width of 12.5 and 2.3 mm, respectively, and thickness of about 0.2 mm. The system is composed of a manipulating robot, a vibrational-type specimen feeder, a rotating-type specimen tray, a specimen observation system, a simulated tension text fixture, and a microcomputer for controlling the system. This system accomplishes specimen arrangement in the specimen tray, specimen transportation and loading to the test fixture and testing, and removal of the broken specimen from the fixture. These procedures are performed quickly, safely, and with uniform testing precision by computer control remotely by an unskilled experimenter

  15. Measurement and control system for the ITER remote handling mock-up test

    International Nuclear Information System (INIS)

    Oka, K.; Kakudate, S.; Takiguchi, Y.; Ako, K.; Taguchi, K.; Tada, E.; Ozaki, F.; Shibanuma, K.

    1998-01-01

    The mock-up test platforms composed of full-scale remote handling (RH) equipment were developed for demonstrating remote replacement of the ITER blanket and divertor. In parallel, the measurement and control system for operating these RH equipment were constructed on the basis of open architecture with object oriented feature, aiming at realization of fully-remoted automatic operation required for ITER. This paper describes the design concept of the measurement and control system for the remote handling equipment of ITER, and outlines the measured performances of the fabricated measurement system for the remote handling mock-up tests, which includes Data Acquisition System (DAS), Visual Monitoring System (VMS) and Virtual Reality System (VRS). (authors)

  16. Development of a Torque Sensor-Based Test Bed for Attitude Control System Verification and Validation

    Science.gov (United States)

    2017-12-30

    AFRL-RV-PS- AFRL-RV-PS- TR-2018-0008 TR-2018-0008 DEVELOPMENT OF A TORQUE SENSOR- BASED TEST BED FOR ATTITUDE CONTROL SYSTEM VERIFICATION AND...Sensor-Based Test Bed for Attitude Control System Verification & Validation 5a. CONTRACT NUMBER FA9453-15-1-0315 5b. GRANT NUMBER 5c. PROGRAM ELEMENT...NUMBER 62601F 6. AUTHOR(S) Norman Fitz-Coy 5d. PROJECT NUMBER 4846 5e. TASK NUMBER PPM00015968 5f. WORK UNIT NUMBER EF125135 7. PERFORMING

  17. Waterhammer Modeling for the Ares I Upper Stage Reaction Control System Cold Flow Development Test Article

    Science.gov (United States)

    Williams, Jonathan H.

    2010-01-01

    The Upper Stage Reaction Control System provides three-axis attitude control for the Ares I launch vehicle during active Upper Stage flight. The system design must accommodate rapid thruster firing to maintain the proper launch trajectory and thus allow for the possibility to pulse multiple thrusters simultaneously. Rapid thruster valve closure creates an increase in static pressure, known as waterhammer, which propagates throughout the propellant system at pressures exceeding nominal design values. A series of development tests conducted in the fall of 2009 at Marshall Space Flight Center were performed using a water-flow test article to better understand fluid performance characteristics of the Upper Stage Reaction Control System. A subset of the tests examined waterhammer along with the subsequent pressure and frequency response in the flight-representative system and provided data to anchor numerical models. This thesis presents a comparison of waterhammer test results with numerical model and analytical results. An overview of the flight system, test article, modeling and analysis are also provided.

  18. Control system of test and research facilities for nuclear energy industry

    International Nuclear Information System (INIS)

    1983-01-01

    IHI manufactures several kinds of test and research facilities used for research and development of new type power reactor and solidification system of high level radioactive liquid waste and safety research of light water reactor. These facilities are usually new type plants themselves, so that their control systems have to be designed individually for each plant with the basic conception. They have many operation modes because of their purposes of research and development, so the operation has to be automatized and requires the complicated sequence control system. In addition to these requirements, the detail design is hardly fixed on schedule and often modified during the initial start up period. Therefore, the computer control system was applied to these facilities with CRT display for man-machine communication earlier than to commercial power plants, because in the computer system the control logic is not hard wired but soft programmed and can be easily modified. In this paper, two typical computer control systems, one for PWR reflood test facility and another for mock-up test facility for solidification of liquid waste, are introduced. (author)

  19. Computer-based regulating control system for the Advanced Test Reactor

    International Nuclear Information System (INIS)

    Johnson, M.R.

    1983-01-01

    This paper describes a new control system which has recently been designed and installed at the Advanced Test Reactor at INEL, replacing an older system that had been in service for some 17 years. Based on modern digital technology, the new system provides improved capability, reliability, and an enhanced man/machine interface that includes comprehensive failure and error messages and voice synthesis. In addition to control functions, and transparent to the operator, the system performs continual on-line checks to sense subsystem failures and takes appropriate automatic action. In the maintenance mode, service technicians can carry on a dialog with the controller to quickly identify faulty components. The operational capabilities of the new system are summarized, and reactor operator training, experience, and acceptance of the system are discussed

  20. Initial virtual flight test for a dynamically similar aircraft model with control augmentation system

    Directory of Open Access Journals (Sweden)

    Linliang Guo

    2017-04-01

    Full Text Available To satisfy the validation requirements of flight control law for advanced aircraft, a wind tunnel based virtual flight testing has been implemented in a low speed wind tunnel. A 3-degree-of-freedom gimbal, ventrally installed in the model, was used in conjunction with an actively controlled dynamically similar model of aircraft, which was equipped with the inertial measurement unit, attitude and heading reference system, embedded computer and servo-actuators. The model, which could be rotated around its center of gravity freely by the aerodynamic moments, together with the flow field, operator and real time control system made up the closed-loop testing circuit. The model is statically unstable in longitudinal direction, and it can fly stably in wind tunnel with the function of control augmentation of the flight control laws. The experimental results indicate that the model responds well to the operator’s instructions. The response of the model in the tests shows reasonable agreement with the simulation results. The difference of response of angle of attack is less than 0.5°. The effect of stability augmentation and attitude control law was validated in the test, meanwhile the feasibility of virtual flight test technique treated as preliminary evaluation tool for advanced flight vehicle configuration research was also verified.

  1. Identification and Modeling of Electrohydraulic Force Control of the Material Test System (MTS)

    International Nuclear Information System (INIS)

    Ruan, J; Pei, X; Zhu, F M

    2006-01-01

    In the heavy-duty material test device, an electrohydraulic force servo system is usually utilized to load the tested samples. The signal from the pressure sensor is compared with the instruction and the difference between them is then fed to a digital servo valve to form a closed loop control to the target force. The performance of the electrohydraulic force servo system is not only closely related to how accurate to feed the flow rate to the hydraulic cylinder, but also the stiffness of the system which is dominated by the compressibility of oil. Thus the clarification of the characteristic parameters becomes the key of the solution to optimal force control. To identify the electrohydraulic force servo system various step signals are input to excite the dynamic response of the system. From the relationship between the step magnitude and the force response, the system model and the key control parameters are determined. The electrohydraulic force servo system is identified as a first order system with time constant varied with the pressure. Based on the identification of the system optimal control parameters are finally obtained and force rate error is reduced to 0.2% from original 3%

  2. First experiences with the ATLAS pixel detector control system at the combined test beam 2004

    International Nuclear Information System (INIS)

    Imhaeuser, Martin; Becks, Karl-Heinz; Henss, Tobias; Kersten, Susanne; Maettig, Peter; Schultes, Joachim

    2006-01-01

    Detector control systems (DCS) include the readout, control and supervision of hardware devices as well as the monitoring of external systems like cooling system and the processing of control data. The implementation of such a system in the final experiment also has to provide the communication with the trigger and data acquisition system (TDAQ). In addition, conditions data which describe the status of the pixel detector modules and their environment must be logged and stored in a common LHC wide database system. At the combined test beam all ATLAS subdetectors were operated together for the first time over a longer period. To ensure the functionality of the pixel detector, a control system was set up. We describe the architecture chosen for the pixel DCS, the interfaces to hardware devices, the interfaces to the users and the performance of our system. The embedding of the DCS in the common infrastructure of the combined test beam and also its communication with surrounding systems will be discussed in some detail

  3. The development and testing of a regenerable CO2 and humidity control system for Shuttle

    Science.gov (United States)

    Boehm, A. M.

    1977-01-01

    A regenerable CO2 and humidity control system is presently being developed for potential use on Shuttle as an alternate to the baseline lithium hydroxide (LiOH) system. The system utilizes a sorbent material (designated 'HS-C') to adsorb CO2 and water vapor from the cabin atmosphere and desorb the CO2 and water vapor overboard when exposed to a space vacuum. Continuous operation is achieved by utilizing two beds which are alternately cycled between adsorption and desorption. This paper presents the significant hardware development and test accomplishments of the past year. A half-size breadboard system utilizing a flight configuration canister was successfully performance tested in simulated Shuttle missions. A vacuum desorption test provided considerable insight into the desorption phenomena and allowed a significant reduction of the Shuttle vacuum duct size. The fabrication and testing of a flight prototype canister and flight prototype vacuum valves have proven the feasibility of these full-size, flight-weight components.

  4. Supervisory control and diagnostics system for the mirror fusion test facility: overview and status 1980

    International Nuclear Information System (INIS)

    McGoldrick, P.R.

    1981-01-01

    The Mirror Fusion Test Facility (MFTF) is a complex facility requiring a highly-computerized Supervisory Control and Diagnostics System (SCDS) to monitor and provide control over ten subsystems; three of which require true process control. SCDS will provide physicists with a method of studying machine and plasma behavior by acquiring and processing up to four megabytes of plasma diagnostic information every five minutes. A high degree of availability and throughput is provided by a distributed computer system (nine 32-bit minicomputers on shared memory). Data, distributed across SCDS, is managed by a high-bandwidth Distributed Database Management System. The MFTF operators' control room consoles use color television monitors with touch sensitive screens; this is a totally new approach. The method of handling deviations to normal machine operation and how the operator should be notified and assisted in the resolution of problems has been studied and a system designed

  5. Computerised weld strength testing machine for PHWR fuel elements with a versatile control system

    International Nuclear Information System (INIS)

    Gupta, U.C.; Sastry, V.S.; Rasheed, Jawad; Bibawe, S.R.

    1994-01-01

    Spacer pads and bearing pads are resistance spot welded on PHWR fuel elements to ensure inter-element gap for coolant flow. These welds are subjected to destructive tests as per SQC specifications while qualifying a machine and during production. The testing machine used earlier over the years was tedious involving manual operations of clamping, tool actuation, increasing and decreasing the pressure, referring to charts and statistical calculations. To carry out the destructive testing of the welds conveniently and reliably, an automatic machine is developed in-house in which are incorporated a quartz force transducer and a computerized data-acquisition and processing system together with a very versatile electronic control system based on a single-chip microcomputer. This paper describes the salient features of the machine and the control system. (author). 4 figs

  6. Development and testing of a diagnostic system for intelligen distributed control at EBR-2

    International Nuclear Information System (INIS)

    Edwards, R.M.; Ruhl, D.W.; Klevans, E.H.; Robinson, G.E.

    1990-01-01

    A diagnostic system is under development for demonstration of Intelligent Distributed Control at the Experimental Breeder Reactor (EBR--II). In the first phase of the project a diagnostic system is being developed for the EBR-II steam plant based on the DISYS expert systems approach. Current testing uses recorded plant data and data from simulated plant faults. The dynamical simulation of the EBR-II steam plant uses the Babcock and Wilcox (B ampersand W) Modular Modeling System (MMS). At EBR-II the diagnostic system operates in the UNIX workstation and receives live plant data from the plant Data Acquisition System (DAS). Future work will seek implementation of the steam plant diagnostic in a distributed manner using UNIX based computers and Bailey microprocessor-based control system. 10 refs., 6 figs

  7. Revitalisation of Control and Data Acquisition Systems for Corrosion Test Loop

    International Nuclear Information System (INIS)

    Khairul Handono; Kiswanta; Edy Sumarno

    2008-01-01

    The replacement of control and data acquisition systems for Corrosion Test Loop (CTL) has been conducted. The aim of revitalisation for CTL is to increase controller system performance Kent 4000 which is based on PLC. On the other side revitalisation of acquisition data system is done to build computer based data retrieval system for transformation gauging of parameters in thermalhydraulic experiment of CTL. Previously, data collector system used indicator recorder analog, while data recording is done manually, which caused causing very slow response and the result is less accurate. To increase the user quality of data collector system, the data acquisition system is developed with application program Visual Basic and acquisition apparatus card of data. Result of the activity of revitalisation CTL is to obtain of control systems based on PLC and data acquisition system capable to present information in the form of temperature, pressure and cooling water level interactively, namely easy to read, quickly, realtime and accurate. This results give the improvement of control systems performance and data acquisition system which data storage of acquisition into hard disk in the form of file and further processed in the form of tables or graph to facilitate the analysis. (author)

  8. A servo controlled gradient loading triaxial model test system for deep-buried cavern

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Xu-guang [College of Engineering, Ocean University of China, Qingdao 266100 (China); Shandong Provincial Key Laboratory of Ocean Engineering, Qingdao 266100 (China); Research Center of Geotechnical and Structural Engineering, Shandong University, Jinan 250061 (China); Zhang, Qiang-yong; Li, Shu-cai [Research Center of Geotechnical and Structural Engineering, Shandong University, Jinan 250061 (China)

    2015-10-15

    A servo controlled gradient loading model test system is developed to simulate the gradient geostress in deep-buried cavern. This system consists of the gradient loading apparatus, the digital servo control device, and the measurement system. Among them, the gradient loading apparatus is the main component which is used for exerting load onto the model. This loading apparatus is placed inside the counterforce wall/beam and is divided to several different loading zones, with each loading zone independently controlled. This design enables the gradient loading. Hence, the “real” geostress field surrounding the deep-buried cavern can be simulated. The loading or unloading process can be controlled by the human-computer interaction machines, i.e., the digital servo control system. It realizes the automation and visualization of model loading/unloading. In addition, this digital servo could control and regulate hydraulic loading instantaneously, which stabilizes the geostress onto the model over a long term. During the loading procedure, the collision between two adjacent loading platens is also eliminated by developing a guide frame. This collision phenomenon is induced by the volume shrinkage of the model when compressed in true 3D state. In addition, several accurate measurements, including the optical and grating-based method, are adopted to monitor the small deformation of the model. Hence, the distortion of the model could be accurately measured. In order to validate the performance of this innovative model test system, a 3D geomechanical test was conducted on a simulated deep-buried underground reservoir. The result shows that the radial convergence increases rapidly with the release of the stress in the reservoir. Moreover, the deformation increases with the increase of the gas production rate. This observation is consistence with field observation in petroleum engineering. The system is therefore capable of testing deep-buried engineering structures.

  9. A servo controlled gradient loading triaxial model test system for deep-buried cavern.

    Science.gov (United States)

    Chen, Xu-guang; Zhang, Qiang-yong; Li, Shu-cai

    2015-10-01

    A servo controlled gradient loading model test system is developed to simulate the gradient geostress in deep-buried cavern. This system consists of the gradient loading apparatus, the digital servo control device, and the measurement system. Among them, the gradient loading apparatus is the main component which is used for exerting load onto the model. This loading apparatus is placed inside the counterforce wall/beam and is divided to several different loading zones, with each loading zone independently controlled. This design enables the gradient loading. Hence, the "real" geostress field surrounding the deep-buried cavern can be simulated. The loading or unloading process can be controlled by the human-computer interaction machines, i.e., the digital servo control system. It realizes the automation and visualization of model loading/unloading. In addition, this digital servo could control and regulate hydraulic loading instantaneously, which stabilizes the geostress onto the model over a long term. During the loading procedure, the collision between two adjacent loading platens is also eliminated by developing a guide frame. This collision phenomenon is induced by the volume shrinkage of the model when compressed in true 3D state. In addition, several accurate measurements, including the optical and grating-based method, are adopted to monitor the small deformation of the model. Hence, the distortion of the model could be accurately measured. In order to validate the performance of this innovative model test system, a 3D geomechanical test was conducted on a simulated deep-buried underground reservoir. The result shows that the radial convergence increases rapidly with the release of the stress in the reservoir. Moreover, the deformation increases with the increase of the gas production rate. This observation is consistence with field observation in petroleum engineering. The system is therefore capable of testing deep-buried engineering structures.

  10. A servo controlled gradient loading triaxial model test system for deep-buried cavern

    International Nuclear Information System (INIS)

    Chen, Xu-guang; Zhang, Qiang-yong; Li, Shu-cai

    2015-01-01

    A servo controlled gradient loading model test system is developed to simulate the gradient geostress in deep-buried cavern. This system consists of the gradient loading apparatus, the digital servo control device, and the measurement system. Among them, the gradient loading apparatus is the main component which is used for exerting load onto the model. This loading apparatus is placed inside the counterforce wall/beam and is divided to several different loading zones, with each loading zone independently controlled. This design enables the gradient loading. Hence, the “real” geostress field surrounding the deep-buried cavern can be simulated. The loading or unloading process can be controlled by the human-computer interaction machines, i.e., the digital servo control system. It realizes the automation and visualization of model loading/unloading. In addition, this digital servo could control and regulate hydraulic loading instantaneously, which stabilizes the geostress onto the model over a long term. During the loading procedure, the collision between two adjacent loading platens is also eliminated by developing a guide frame. This collision phenomenon is induced by the volume shrinkage of the model when compressed in true 3D state. In addition, several accurate measurements, including the optical and grating-based method, are adopted to monitor the small deformation of the model. Hence, the distortion of the model could be accurately measured. In order to validate the performance of this innovative model test system, a 3D geomechanical test was conducted on a simulated deep-buried underground reservoir. The result shows that the radial convergence increases rapidly with the release of the stress in the reservoir. Moreover, the deformation increases with the increase of the gas production rate. This observation is consistence with field observation in petroleum engineering. The system is therefore capable of testing deep-buried engineering structures

  11. Submicronic Particle Measurement Instrumentation Test Bench Data Acquisition and Control System

    International Nuclear Information System (INIS)

    Alberdi, J.; Barcala, J. M.; Sanz, D.; Gomez, F. J.; Molinero, A.; Navarrete, J. J.

    1999-01-01

    This document describes the SAD-100 system characteristics. The unit makes the instrumentation test bench data acquisition and control, SAD-100 was designed and developed by Electronic and Automation Area (CIEMAT) and Aerosol Technology in Energy Generation Project (CIEMAT). (Author) 2 refs

  12. 46 CFR 185.320 - Steering gear, controls, and communication system tests.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Steering gear, controls, and communication system tests. 185.320 Section 185.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) OPERATIONS Miscellaneous Operating Requirements § 185.320 Steering...

  13. Instrumentation, control and data acquisition system with multiple configurations for test in nuclear environment

    Energy Technology Data Exchange (ETDEWEB)

    Monti, Chiara, E-mail: chiara.monti@enea.it; Neri, Carlo; Pollastrone, Fabio

    2015-10-15

    Highlights: • ENEA developed and characterized a first prototype of the In-Vessel Viewing System (IVVS) probe for ITER. • Piezo motor technology to be used in IVVS probe was tested in neutrons, gamma radiations, high temperature, vacuum and high magnetic fields. • A general architecture of the Data Acquisition and Control System (DACS) was defined and then specialized for each test. • The test campaign has validated instrumentation solutions, which can be effectively used in final IVVS implementation or other ITER diagnostics or applications. - Abstract: The In-Vessel Viewing System is a 3D laser scanning system which will be used to inspect the blanket first wall in ITER. To make the IVVS probe design compatible with the harsh environmental conditions present in ITER, a test campaign was performed in 2012–2013 to verify the adequacy of the main components of the IVVS probe. The IVVS components inspected were an optical encoder, passive components and two customized ultrasonic piezoceramic motors that were instrumented with various sensors. A general architecture of the Data Acquisition and Control System (DACS) was defined and then specialized for each test. To be suitable for this test campaign, the DACS had to host various I/O modules and to properly interface the driver of the customized piezo motors, in order to permit the full control of the test and the acquisition of experimental data. This paper presents the instrumentation solutions designed and implemented for different facilities constraints and the related DACS developed in four specialized versions for the described test campaign.

  14. Design and adjustment on test bed of replacing subassembly machine control system for China experimental fast reactor

    International Nuclear Information System (INIS)

    Dong Shengguo; Ma Hongsheng; Zhao Lixia

    2008-01-01

    The present research concerns in the design and adjustment of replacing sub- assembly machine control system of China Experimental Fast Reactor. The design of replacing subassembly machine control system adopts some electric equipments, such as programmable controllers, digital DC drivers. The designed control system was adjusted on the test bed. The results indicate that the operation of the control system is steady and reliable, and designed control system can meet the needs of the design specification. (authors)

  15. Development of data acquisition and control system for ICH & CD transmission line components test facility

    Energy Technology Data Exchange (ETDEWEB)

    Patel, Manoj, E-mail: manoj.patel@iter-india.org [ITER-India, Institute for Plasma Research, Bhat, Gandhinagar 382428, Gujarat (India); Jha, Akhil [ITER-India, Institute for Plasma Research, Bhat, Gandhinagar 382428, Gujarat (India); Patel, Nidhi [Department of Instrumentation & Control Engineering, Dharmsinh Desai University, Nadiad 387001, Gujarat (India); Krishna, J.V.S. Hari; Rajnish, Kumar; Soni, Dipal; Verma, Sriprakash; Patel, Hriday; Trivedi, Rajesh; Mukherjee, Aparajita [ITER-India, Institute for Plasma Research, Bhat, Gandhinagar 382428, Gujarat (India)

    2016-11-15

    Highlights: • Traveling Wave Resonator (TWR) gain achieved is 13.58 dB using 10 dB coupler. • Software module for Automatic calibration for power detector is developed and integrated. • Application module is developed using LabVIEW™ for high power RF operation of TWR. - Abstarct: India is developing a very high power test bed (∼MW level) based on concept of Travelling Wave Resonator (TWR) for testing of passive transmission line components [3]. Data acquisition and control system is required for safe and reliable operation of TWR. It includes online monitoring of input power and circulating ring power. Acquired RF signal provides information about forward and reflected RF power. For MW power level testing, system is protected against arc and thermal effect during CW operation. National Instrument make hardware and software have been used to acquire signals from RF detector, Arc detectors, IR camera and thermocouples etc. LabVIEW™ based software has been developed for calculation of RF parameters. Graphical user interface is developed for better visualization. Initial testing of the TWR setup with 10 dB coupler provides a power gain of 13.58 dB (22X). For future 3 MW TWR test bed the required power gain is ∼20 dB (100X) since the available source is ∼40 kW. This paper describes the detail design and integrated test results for data acquisition and control system for TWR test bed.

  16. Development of control technology for HTTR hydrogen production system with mock-up test facility

    International Nuclear Information System (INIS)

    Ohashi, Hirofumi; Inaba, Yoshitomo; Nishihara, Tetsuo; Takeda, Tetsuaki; Hayashi, Koji; Takada, Shoji; Inagaki, Yoshiyuki

    2006-01-01

    The Japan Atomic Energy Agency has been planning the demonstration test of hydrogen production with the High Temperature Engineering Test Reactor (HTTR). In a HTTR hydrogen production system (HTTR-H2), it is required to control a primary helium temperature within an allowable value at a reactor inlet to prevent a reactor scram. A cooling system for a secondary helium with a steam generator (SG) and a radiator is installed at the downstream of a chemical rector in a secondary helium loop in order to mitigate the thermal disturbance caused by the hydrogen production system. Prior to HTTR-H2, the simulation test with a mock-up test facility has been carried out to establish the controllability on the helium temperature using the cooling system against the loss of chemical reaction. It was confirmed that the fluctuations of the helium temperature at chemical reactor outlet, more than 200 K, at the loss of chemical reaction could be successfully mitigated within the target of ±10 K at SG outlet. A dynamic simulation code of the cooling system for HTTR-H2 was verified with the obtained test data

  17. Performance of MSRE Nuclear Power Control Systems (MSRE Test Report 5.2.1)

    International Nuclear Information System (INIS)

    Gabbard, C. H.

    1968-01-01

    The nuclear power control systems of the MSRE were evaluated by observing the steady-state operation of the reactor and by conducting a series of transient tests. The temperature servo was found capable of controlling all the transients that were introduced. However, because of the relatively slow response and inherent stability of the reactor system, the temperature servo was found to be relatively inactive during many of the load change transients. The automatic load control operated as expected except that the minimum power available to the automatic control was about 2 Mw instead of l Mw as had been planned. This has not caused a problem in the reactor operation because the load control has normally been operated in 'manual'.

  18. Full scale impact testing for environmental and safety control of energy material shipping container systems

    International Nuclear Information System (INIS)

    Seagren, R.D.

    1978-01-01

    Heavily-shielded energy material shipping systems, similar in size and weight to those presently employed to transport irradiated reactor fuel elements, are being destructively tested under dynamic conditions. In these tests, the outer and inner steel shells interact in a complex manner with the massive biological shielding in the system. Results obtained from these tests provide needed information for new design concepts. Containment failure (and the resulting release of radioactive material to the environment which might occur in an extremely severe accident) is most likely through the seals and other ancillary features of the shipping systems. Analyses and experiments provide engineering data on the behavior of these shipping systems under severe accident conditions and information for predicting potential survivability and environmental control with a rational margin of safety

  19. Test and Control System for Chlorophyll Fluorescence Parameters Using LED as Excitation Source

    Directory of Open Access Journals (Sweden)

    Zou Qiuying

    2014-05-01

    Full Text Available A new scheme on test and control system for chlorophyll fluorescence is presented in this work, which uses light-emitting diode (LED excitation by means of measuring the fluorescence parameter fpsII. The system takes programmable power supply as LEDs illumination drive power with high sensitivity and signal-to-noise ratio. MINIPAM is used to measure fluorescence parameter fpsII and keeps communication with upper PC by serial port. The upper PC can control the power supply and process the data received from MINIPAM by software which is programmed in VB6. The results show that the system has a lot of advantages such as high accuracy and convenience. The effect of environmental factors on fluorescence parameters is analyzed comprehensively. It will be a practical measurement and control system for photosynthetic ability and have wide application foreground.

  20. Performance of an automatic dose control system for CT. Specifications and basic phantom tests

    Energy Technology Data Exchange (ETDEWEB)

    Nagel, H.D. [Wissenschaft und Technik fuer die Radiolgoe, Dr. HD Nagel, Buchholz (Germany); Stumpp, P.; Kahn, T.; Gosch, D. [Universitaetsklinikum Leipzig (Germany). Klinik und Poliklinik fuer Diagnostische und Interventionelle Radiologie

    2011-01-15

    Purpose: To assess the performance and to provide more detailed insight into the characteristics and limitations of devices for automatic dose control (ADC) in CT. Materials and Methods: A comprehensive study on DoseRight 2.0, the ADC system provided by Philips for its Brilliance CT scanners, was conducted. Phantom tests were carried out on a 64-slice scanner (Brilliance 64) using assorted quality control (QC) phantoms that allowed verification of the basic specifications. If feasible, the findings were verified by model calculations based on known specifications. Results: For all tests, the dose reductions and modulation characteristics fully met the values expected from the specifications. Adverse effects due to increased image noise were only moderate as a result of the 'adequate noise system' design that employs comparatively gentle modulation, and the additional use of adaptive filtration. Conclusion: Simple tests with QC phantoms allow evaluation of the most relevant characteristics of devices for ADC in CT. (orig.)

  1. Design And Construction Of Controller System And Data Acquisition Of Creep Test Machine

    International Nuclear Information System (INIS)

    Farokhi; Arhatari, B.D.; DT. SonyTj.. Histori; Sudarno; Haryanto, Mudi; Triyadi, Ari

    2001-01-01

    Design and construction of creep test machine have been done to get a higher performance of controller system and data acquisition of that machine. The Design and construction were made by adding an automatic power control circuit, an interface and computer program on PC. The interface circuit is made in a form of a card which applicable on the compatible ISA-IBM PC. The computer program is written in turbo C++. With that modification, the test results show reduction in measurement error from 80μm to 90μm. The modification gives also benefit semi-automatic of the creep test machine. It means decreasing on the operator dependence. Another advantages are to make easier on the result data reading, to show the result data on the real time or on file, to make easier on appearing of a test result curve and on the result data analysis

  2. Image processing and computer controls for video profile diagnostic system in the ground test accelerator (GTA)

    International Nuclear Information System (INIS)

    Wright, R.; Zander, M.; Brown, S.; Sandoval, D.; Gilpatrick, D.; Gibson, H.

    1992-01-01

    This paper describes the application of video image processing to beam profile measurements on the Ground Test Accelerator (GTA). A diagnostic was needed to measure beam profiles in the intermediate matching section (IMS) between the radio-frequency quadrupole (RFQ) and the drift tube linac (DTL). Beam profiles are measured by injecting puffs of gas into the beam. The light emitted from the beam-gas interaction is captured and processed by a video image processing system, generating the beam profile data. A general purpose, modular and flexible video image processing system, imagetool, was used for the GTA image profile measurement. The development of both software and hardware for imagetool and its integration with the GTA control system (GTACS) is discussed. The software includes specialized algorithms for analyzing data and calibrating the system. The underlying design philosophy of imagetool was tested by the experience of building and using the system, pointing the way for future improvements. (Author) (3 figs., 4 refs.)

  3. Design and development of embedded control system for high power RF test facility

    International Nuclear Information System (INIS)

    Nageswara Rao, J.; Badapanda, M.K.; Upadhyay, Rinki; Tripathi, Akhilesh; Hannurkar, P.R.

    2013-01-01

    Design and development of an embedded control system for the control, interlock and operation of 1MW, 352.2 MHz TH2089 klystron based RF test facility. The key components of the control system are NI compact Re configurable Input Output (cRIO) system and Windows based PC. The cRIO system's rugged hardware architecture includes a 1.06 GHz Dual-Core embedded controller with Real Time (RT) Operating System, a reconfigurable Field Programmable Gate Array (FPGA) chassis for custom I/O timing, control and processing; and I/O modules. Windows based Graphical User Interface (GUI) has been developed to guide the user through start-up procedure, to set the operating parameters and also to display the status information of all the signals. The application software for data logging and publishing of the acquired data namely set, read back and status signals of auxiliary power supplies and machine safety interlocks has been developed in LabVIEW RT module and is running on embedded controller. Machine safety interlock logic has been implemented in FPGA to meet the time criticality. (author)

  4. Computer system design description for SY-101 hydrogen mitigation test project data acquisition and control system (DACS-1). Revision 1

    International Nuclear Information System (INIS)

    Truitt, R.W.

    1994-01-01

    This document provides descriptions of components and tasks that are involved in the computer system for the data acquisition and control of the mitigation tests conducted on waste tank SY-101 at the Hanford Nuclear Reservation. The system was designed and implemented by Los alamos National Laboratory and supplied to Westinghouse Hanford Company. The computers (both personal computers and specialized data-taking computers) and the software programs of the system will hereafter collectively be referred to as the DACS (Data Acquisition and Control System)

  5. Test Control Center (TCC)

    Data.gov (United States)

    Federal Laboratory Consortium — The Test Control Center (TCC) provides a consolidated facility for planning, coordinating, controlling, monitoring, and analyzing distributed test events. ,The TCC...

  6. System Design Description for the SY-101 Hydrogen Mitigation Test Project Data Acquisition and Control System (DACS-1)

    Energy Technology Data Exchange (ETDEWEB)

    ERMI, A.M.

    1999-08-25

    This document describes the hardware and software of the computer subsystems for the Data Acquisition and Control System (DACS) used in mitigation tests conducted on waste tank 241-SY-101 at the Hanford Nuclear Reservation, The original system was designed and implemented by LANL, supplied to WHC, and turned over to LMHC for operation. In 1999, the hardware and software were upgraded to provide a state-of-the-art, Year-2000 compliant system.

  7. Control System and Tests for the 13.2-m RAEGE Antenna at Yebes

    Science.gov (United States)

    de Vicente, P.; Bolaño, R.; Barbas, L.

    2014-12-01

    The RAEGE network is being deployed. The antenna at the Yebes Observatory is the first one in the network, and its construction finished in October 2013. During the construction phase, the remote control system for the antenna and the receivers was developed, and during the commisioning time the software was tested by MT-Mechatronics. As a result, both the control system from MT-Mechatronics and the remote control system by the IGN-CDT were debugged. We have tested the basic functionality of the antenna operated as a single dish telescope. First light at S, X, and Ka band was achieved on February 10^{th}. Afterwards a pointing model for the whole sky was determined, together with an optimum focus position as a function of elevation. Commisioning is not finished yet, and the antenna will be totally delivered to the IGN-CDT in the next weeks. VLBI equipment will be installed within three months, and VLBI observations are foreseen by the end of 2014. In this paper, we provide an overview of the control system and of the main results achieved.

  8. WindoWorks: A flexible program for computerized testing of accelerator control system electronic circuit boards

    International Nuclear Information System (INIS)

    Utterback, J.

    1993-09-01

    Since most accelerator control system circuit boards reside in a commercial bus architecture, such as CAMAC or VMEbus, a computerized test station is needed for exercising the boards. This test station is needed for the development of newly designed prototypes, for commissioning newly manufactured boards, for diagnosing boards which have failed in service, and for long term testing of boards with intermittent failure problems. WindoWorks was created to address these needs. It is a flexible program which runs on a PC compatible computer and uses a PC to bus crate interface. WindoWorks was designed to give the user a flexible way to test circuit boards. Each test is incapsulated into a window. By bringing up several different windows the user can run several different tests simultaneously. The windows are sizable, and moveable. They have data entry boxes so that the test can be customized to the users preference. The windows can be used in conjunction with each other in order to create supertests. There are several windows which are generic. They can be used to test basic functions on any VME (or CAMAC) board. There are other windows which have been created to test specific boards. New windows for testing specific boards can be easily created by a Pascal programmer using the WindoWorks framework

  9. Computer system design description for SY-101 hydrogen mitigation test project data acquisition and control system (DACS-1)

    International Nuclear Information System (INIS)

    Ermi, A.M.

    1997-01-01

    Description of the Proposed Activity/REPORTABLE OCCURRENCE or PIAB: This ECN changes the computer systems design description support document describing the computers system used to control, monitor and archive the processes and outputs associated with the Hydrogen Mitigation Test Pump installed in SY-101. There is no new activity or procedure associated with the updating of this reference document. The updating of this computer system design description maintains an agreed upon documentation program initiated within the test program and carried into operations at time of turnover to maintain configuration control as outlined by design authority practicing guidelines. There are no new credible failure modes associated with the updating of information in a support description document. The failure analysis of each change was reviewed at the time of implementation of the Systems Change Request for all the processes changed. This document simply provides a history of implementation and current system status

  10. Upgrading the data acquisition and control systems of the European Breeding Blanket Test Facility

    International Nuclear Information System (INIS)

    Mannori, Simone; Sermenghi, Valerio; Utili, Marco; Malavasi, Andrea; Gianotti, Daniel

    2013-01-01

    Highlights: • Data Acquisition and Control Systems (DACS) upgrading of experimental plant for full size thermo hydraulic testing of nuclear subsystems. • DACS development using integrated hardware/software platform with graphical programming (LabVIEW). • Development of simplified models for real-time simulation. • Rapid prototyping with real time simulation of the complete plant. • Using the code developed for the real time simulator for the real plant DACS. -- Abstract: The EBBTF (European Breeding Blanket Test Facility) experimental plant is a key component for the development of the breeding blankets (TBMs test blanket modules, HCLL helium cooled lithium lead and HCPB helium cooled pebble bed types) used by ITER. EBBTF is an experimental plant which provides the double breeding/cooling loops (liquid metal and gas) required for HCLL testing. EBBTF is composed of four subsystems (TBM, IELLLO integrated European lead lithium loop, HE-FUS3 helium fusion loop, version 3 and helium compressor build by ATEKO) with dedicated control systems realized with hardware/software combinations covering 15 years (1995–2010) time span. At the end of 2010 we began to upgrade the HE-FUS3 data acquisition control systems (DACS) replacing the obsolete PLC Siemens S5 with National Instruments Compact FieldPoint and LabVIEW. The control room has been completely reorganized using high resolution monitors and workstations linked with standard Ethernet interfaces. The data acquisition, control, safety and SCADA software has been completely developed in ENEA using LabVIEW. In this paper we are going to discuss the technical difficulties and the solutions that we have used to accomplish the upgrade

  11. MP98, an innovative reactivity control system for LWR and VHTR, tests results on prototypes

    International Nuclear Information System (INIS)

    Emin, M.; Gagne, J.F.

    2005-01-01

    MP98' Reactivity Control System is now a technology tested on a real scale prototypes. Demonstrator is working at PWR real conditions (155 bars, 320 degree C), and many accidents configurations could be simulated. This paper presents the technology, describes the demonstrator design and presents some results. Mock up and demonstrator have permitted to optimize the design of MP98' devices to prepare industrialization. (authors)

  12. Development of an Automated LIBS Analytical Test System Integrated with Component Control and Spectrum Analysis Capabilities

    International Nuclear Information System (INIS)

    Ding Yu; Tian Di; Chen Feipeng; Chen Pengfei; Qiao Shujun; Yang Guang; Li Chunsheng

    2015-01-01

    The present paper proposes an automated Laser-Induced Breakdown Spectroscopy (LIBS) analytical test system, which consists of a LIBS measurement and control platform based on a modular design concept, and a LIBS qualitative spectrum analysis software and is developed in C#. The platform provides flexible interfacing and automated control; it is compatible with different manufacturer component models and is constructed in modularized form for easy expandability. During peak identification, a more robust peak identification method with improved stability in peak identification has been achieved by applying additional smoothing on the slope obtained by calculation before peak identification. For the purpose of element identification, an improved main lines analysis method, which detects all elements on the spectral peak to avoid omission of certain elements without strong spectral lines, is applied to element identification in the tested LIBS samples. This method also increases the identification speed. In this paper, actual applications have been carried out. According to tests, the analytical test system is compatible with components of various models made by different manufacturers. It can automatically control components to get experimental data and conduct filtering, peak identification and qualitative analysis, etc. on spectral data. (paper)

  13. Instrumentation and control system for the AT-2 accelerator test stand

    International Nuclear Information System (INIS)

    Wadlinger, E.A.; Holtkamp, D.B.; Holt, H.D.

    1984-01-01

    A data-driven subroutine package, written for our accelerator test stand (ATS), is described. This flexible package permits the rapid writing and modifying of data acquisition, control, and analysis programs for the many diverse experiments performed on the ATS. These structurally simple and easy to maintain routines help to control administratively the integrity of the ATS through the use of the database. Our operating experience indicates that the original design goals have been met. We describe the subroutines, database, and our experiences with this system

  14. Internal Thermal Control System Hose Heat Transfer Fluid Thermal Expansion Evaluation Test Report

    Science.gov (United States)

    Wieland, P. O.; Hawk, H. D.

    2001-01-01

    During assembly of the International Space Station, the Internal Thermal Control Systems in adjacent modules are connected by jumper hoses referred to as integrated hose assemblies (IHAs). A test of an IHA has been performed at the Marshall Space Flight Center to determine whether the pressure in an IHA filled with heat transfer fluid would exceed the maximum design pressure when subjected to elevated temperatures (up to 60 C (140 F)) that may be experienced during storage or transportation. The results of the test show that the pressure in the IHA remains below 227 kPa (33 psia) (well below the 689 kPa (100 psia) maximum design pressure) even at a temperature of 71 C (160 F), with no indication of leakage or damage to the hose. Therefore, based on the results of this test, the IHA can safely be filled with coolant prior to launch. The test and results are documented in this Technical Memorandum.

  15. Tank Monitor and Control System sensor acceptance test procedure. Revision 6

    International Nuclear Information System (INIS)

    Scaief, C.C. III.

    1994-01-01

    The purpose of this Acceptance Test Procedure (ATP) is to verify the correct reading of sensor elements connected to the Tank Monitor and Control System (TMACS). The system functional requirements are contained in WHC-SD-WM-RD-013, Rev. 1 (WHC 1992a). This ATP is intended to be used for testing of the connection of existing temperature sensors, new temperature sensors, pressure sensing equipment, new Enraf level gauges, sensors that generate a current output, and discrete (on/off) inputs. The TMACS operation was verified by the original ATP (WHC 1991 c). It is intended that this ATP will be used each time sensors are added to the system. As a result, the data sheets have been designed to be generic

  16. Tank Monitor and Control System sensor acceptance test procedure. Revision 5

    International Nuclear Information System (INIS)

    Scaief, C.C. III.

    1994-01-01

    The purpose of this acceptance test procedure (ATP) is to verify the correct reading of sensor elements connected to the Tank Monitor and Control System (TMACS). This ATP is intended to be used for testing of the connection of existing temperature sensors, new temperature sensors, pressure sensing equipment, new Engraf level gauges, sensors that generate a current output, and discrete (on/off) inputs. It is intended that this ATP will be used each time sensors are added to the system. As a result, the data sheets have been designed to be generic. The TMACS has been designed in response to recommendations from the Defense Nuclear Facilities Safety Board primarily for improved monitoring of waste tank temperatures. The system has been designed with the capability to monitor other types of sensor input as well

  17. Computer control and data acquisition system for the Mirror Fusion Test Facility Ion Cyclotron Resonant Heating System (ICRH)

    International Nuclear Information System (INIS)

    Cheshire, D.L.; Thomas, R.A.

    1985-01-01

    The Lawrence Livermore National Laboratory (LLNL) large Mirror Fusion Test Facility (MFTF-B) will employ an Ion Cyclotron Resonant Heating (ICRH) system for plasma startup. As the MFTF-B Industrial Participant, TRW has responsibility for the ICRH system, including development of the data acquisition and control system. During the MFTF-B Supervisory Control and Diagnostic System (SCDS). For subsystem development and checkout at TRW, and for verification and acceptance testing at LLNL, the system will be run from a stand-alone computer system designed to simulate the functions of SCDS. The ''SCDS Simulator'' was developed originally for the MFTF-B ECRH System; descriptions of the hardware and software are updated in this paper. The computer control and data acquisition functions implemented for ICRH are described, including development status, and test schedule at TRW and at LLNL. The application software is written for the SCDS Simulator, but it is programmed in PASCAL and designed to facilitate conversion for use on the SCDS computers

  18. Flight Test Results for the F-16XL With a Digital Flight Control System

    Science.gov (United States)

    Stachowiak, Susan J.; Bosworth, John T.

    2004-01-01

    In the early 1980s, two F-16 airplanes were modified to extend the fuselage length and incorporate a large area delta wing planform. These two airplanes, designated the F-16XL, were designed by the General Dynamics Corporation (now Lockheed Martin Tactical Aircraft Systems) (Fort Worth, Texas) and were prototypes for a derivative fighter evaluation program conducted by the United States Air Force. Although the concept was never put into production, the F-16XL prototypes provided a unique planform for testing concepts in support of future high-speed supersonic transport aircraft. To extend the capabilities of this testbed vehicle the F-16XL ship 1 aircraft was upgraded with a digital flight control system. The added flexibility of a digital flight control system increases the versatility of this airplane as a testbed for aerodynamic research and investigation of advanced technologies. This report presents the handling qualities flight test results covering the envelope expansion of the F-16XL with the digital flight control system.

  19. Design of Data Acquisition and Control System for Indian Test Facility of Diagnostics Neutral Beam

    International Nuclear Information System (INIS)

    Soni, Jignesh; Tyagi, Himanshu; Yadav, Ratnakar; Rotti, Chandramouli; Bandyopadhyay, Mainak; Bansal, Gourab; Gahluat, Agrajit; Sudhir, Dass; Joshi, Jaydeep; Prasad, Rambilas; Pandya, Kaushal; Shah, Sejal; Parmar, Deepak; Chakraborty, Arun

    2015-01-01

    Highlights: • More than 900 channels Data Acquisition and Control System. • INTF DACS has been designed based on ITER-PCDH guidelines. • Separate Interlock and Safety system designed based on IEC 61508 standard. • Hardware selected from ITER slow controller and fast controller catalog. • Software framework based on ITER CODAC Core System and LabVIEW software. - Abstract: The Indian Test Facility (INTF) – a negative hydrogen ion based 100 kV, 60 A, 5 Hz modulated NBI system having 3 s ON/20 s OFF duty cycle. Prime objective of the facility is to install a full-scale test bed for the qualification of all Diagnostic Neutral Beam (DNB) parameters, prior to installation in ITER. The automated and safe operation of the INTF will require a reliable and rugged instrumentation and control system which provide control, data acquisition (DAQ), interlock and safety functions, referred as INTF-DACS. The INTF-DACS has been decided to be design based on the ITER CODAC architecture and ITER-PCDH guidelines since the technical understanding of CODAC technology gained from this will later be helpful in development of plant system I&C for DNB. For complete operation of the INTF, approximately 900 numbers of signals are required to be superintending by the DACS. In INTF conventional control loop time required is within the range of 5–100 ms and for DAQ except high-end diagnostics, required sampling rates in range of 5 sample per second (Sps) to 10 kSps; to fulfill these requirements hardware components have been selected from the ITER slow and fast controller catalogs. For high-end diagnostics required sampling rates up to 100 MSps normally in case of certain events, therefore event and burst based DAQ hardware has been finalized. Combined use of CODAC core software (CCS) and NI-LabVIEW has been finalized due to the fact that full required DAQ support is not available in present version of CCS. Interlock system for investment protection of facility and Safety system for

  20. Design of Data Acquisition and Control System for Indian Test Facility of Diagnostics Neutral Beam

    Energy Technology Data Exchange (ETDEWEB)

    Soni, Jignesh, E-mail: jsoni@ipr.res.in [Institute for Plasma Research, Bhat, Gandhinagar 382 428, Gujarat (India); Tyagi, Himanshu; Yadav, Ratnakar; Rotti, Chandramouli; Bandyopadhyay, Mainak [ITER-India, Institute for Plasma Research, Gandhinagar 380 025, Gujarat (India); Bansal, Gourab; Gahluat, Agrajit [Institute for Plasma Research, Bhat, Gandhinagar 382 428, Gujarat (India); Sudhir, Dass; Joshi, Jaydeep; Prasad, Rambilas [ITER-India, Institute for Plasma Research, Gandhinagar 380 025, Gujarat (India); Pandya, Kaushal [Institute for Plasma Research, Bhat, Gandhinagar 382 428, Gujarat (India); Shah, Sejal; Parmar, Deepak [ITER-India, Institute for Plasma Research, Gandhinagar 380 025, Gujarat (India); Chakraborty, Arun [Institute for Plasma Research, Bhat, Gandhinagar 382 428, Gujarat (India)

    2015-10-15

    Highlights: • More than 900 channels Data Acquisition and Control System. • INTF DACS has been designed based on ITER-PCDH guidelines. • Separate Interlock and Safety system designed based on IEC 61508 standard. • Hardware selected from ITER slow controller and fast controller catalog. • Software framework based on ITER CODAC Core System and LabVIEW software. - Abstract: The Indian Test Facility (INTF) – a negative hydrogen ion based 100 kV, 60 A, 5 Hz modulated NBI system having 3 s ON/20 s OFF duty cycle. Prime objective of the facility is to install a full-scale test bed for the qualification of all Diagnostic Neutral Beam (DNB) parameters, prior to installation in ITER. The automated and safe operation of the INTF will require a reliable and rugged instrumentation and control system which provide control, data acquisition (DAQ), interlock and safety functions, referred as INTF-DACS. The INTF-DACS has been decided to be design based on the ITER CODAC architecture and ITER-PCDH guidelines since the technical understanding of CODAC technology gained from this will later be helpful in development of plant system I&C for DNB. For complete operation of the INTF, approximately 900 numbers of signals are required to be superintending by the DACS. In INTF conventional control loop time required is within the range of 5–100 ms and for DAQ except high-end diagnostics, required sampling rates in range of 5 sample per second (Sps) to 10 kSps; to fulfill these requirements hardware components have been selected from the ITER slow and fast controller catalogs. For high-end diagnostics required sampling rates up to 100 MSps normally in case of certain events, therefore event and burst based DAQ hardware has been finalized. Combined use of CODAC core software (CCS) and NI-LabVIEW has been finalized due to the fact that full required DAQ support is not available in present version of CCS. Interlock system for investment protection of facility and Safety system for

  1. Oak Ridge Toxic Substances Control Act (TSCA) Incinerator test bed for continuous emissions monitoring systems (CEMS)

    International Nuclear Information System (INIS)

    Gibson, L.V. Jr.

    1997-01-01

    The Toxic Substances Control Act (TSCA) Incinerator, located on the K-25 Site at Oak Ridge, Tennessee, continues to be the only operational incinerator in the country that can process hazardous and radioactively contaminated polychlorinated biphenyl (PCB) waste. During 1996, the US Department of Energy (DOE) Environmental Management Office of Science and Technology (EM-50) and Lockheed Martin Energy Systems established a continuous emissions monitoring systems (CEMS) test bed and began conducting evaluations of CEMS under development to measure contaminants from waste combustion and thermal treatment stacks. The program was envisioned to promote CEMS technologies meeting requirements of the recently issued Proposed Standards for Hazardous Waste Combustors as well as monitoring technologies that will allay public concerns about mixed waste thermal treatment and accelerate the development of innovative treatment technologies. Fully developed CEMS, as well as innovative continuous or semi-continuous sampling systems not yet interfaced with a pollutant analyzer, were considered as candidates for testing and evaluation. Complementary to other Environmental Protection Agency and DOE sponsored CEMS testing and within compliant operating conditions of the TSCA Incinerator, prioritization was given to multiple metals monitors also having potential to measure radionuclides associated with particulate emissions. In August 1996, developers of two multiple metals monitors participated in field activities at the incinerator and a commercially available radionuclide particulate monitor was acquired for modification and testing planned in 1997. This paper describes the CEMS test bed infrastructure and summarizes completed and planned activities

  2. Verification tests for remote controlled inspection system in nuclear power plants

    International Nuclear Information System (INIS)

    Kohno, Tadaaki

    1986-01-01

    Following the increase of nuclear power plants, the total radiation exposure dose accompanying inspection and maintenance works tended to increase. Japan Power Engineering and Inspection Corp. carried out the verification test of a practical power reactor automatic inspection system from November, 1981, to March, 1986, and in this report, the state of having carried out this verification test is described. The objects of the verification test were the equipment which is urgently required for reducing radiation exposure dose, the possibility of realization of which is high, and which is important for ensuring the safety and reliability of plants, that is, an automatic ultrasonic flaw detector for the welded parts of bend pipes, an automatic disassembling and inspection system for control rod driving mechanism, a fuel automatic inspection system, and automatic decontaminating equipments for steam generator water chambers, primary system crud and radioactive gas in coolant. The results of the verification test of these equipments were judged as satisfactory, therefore, the application to actual plants is possible. (Kako, I.)

  3. A modification design and adjusting test for instruments and control system of critical assembly

    International Nuclear Information System (INIS)

    Wu Manrong; Li Guangjian

    1996-12-01

    A more reliable and safe control system and it's instruments for HFETRCA (high flux engineering test reactor critical assembly) have been built. In the system high performance CMOS unit was used, which has high integration, strong anti-interference and high trigger threshold. In the design of control rod driving circuit, the speed negative feedback principle was applied that results in more stable rotating rate of motors of transmission mechanism and more flexibility of adjusting rod speed. In order to improve reactor safety in accident, additional control circuit is equipped, by which not only control rods with electromagnet will rapidly drop but also other control rods will insert at the speed of 2∼6 times faster than the normal inserting speed. The key technique in the adjustment and new method of anti-interference are also introduced. After more than 40 times physical experiments with (4 x 4 - 4) fuel element in HFETRC, it is proved that the design and adjustment of the system is successful and they can be used as a reference to others. (3 figs., 2 tabs.)

  4. Design and Implementation of the Control System of an Internal Combustion Engine Test Unit

    Directory of Open Access Journals (Sweden)

    Tufan Koç

    2014-02-01

    Full Text Available Accurate tests and performance analysis of engines are required to minimize measurement errors and so the use of the advanced test equipment is imperative. In other words, the reliable test results depend on the measurement of many parameters and recording the experimental data accurately which is depended on engine test unit. This study aims to design the control system of an internal combustion engine test unit. In the study, the performance parameters of an available internal combustion engine have been transferred to computer in real time. A data acquisition (DAQ card has been used to transfer the experimental data to the computer. Also, a user interface has been developed for performing the necessary procedures by using LabVIEW. The dynamometer load, the fuel consumption, and the desired speed can easily be adjusted precisely by using DAQ card and the user interface during the engine test. Load, fuel consumption, and temperature values (the engine inlet-outlet, exhaust inlet-outlet, oil, and environment can be seen on the interface and also these values can be recorded to the computer. It is expected that developed system will contribute both to the education of students and to the researchers’ studies and so it will eliminate a major lack.

  5. [Evaluation on application of China Disease Prevention and Control Information System of Hydatid Disease II System integration and simulation tests].

    Science.gov (United States)

    Qing, Yu; Shuai, Han; Qiang, Wang; Jing-Bo, Xue

    2017-06-08

    To report the integrated progress of the hydatid disease information management system, and to provide the reference for further system improvements by analysis of results on simulation test feedback. The work of institutional code matching by collecting fundamental and integrated information of the system in epidemic areas of hydatid disease was carried out, and professional control agencies were selected to carry out the simulation test. The results of agencies code matching at stage indicated the average completion rate was 94.30% on administrative agencies, 69.94% on registered professional agencies and 56.40% on professional institutions matching related to hydatid disease prevention and control implements in seven provinces (autonomous regions) and Xinjiang Production and Construction Corps. Meanwhile, the response rate of open-ended proposals was 93.33% on fifteen feedbacks, and the statistics showed 21.43% believed the system was low fluency, 64.29% considered the system was inconvenience for data inputs and 42.86% considered it would be improved on system statistics functions, of which 27.78% were provincial users, 22.22% were the city users and 50.00% were the county users. The hydatid disease prevention information management system meets the fundamental needs of the majority agencies in hyperendemic areas of echinococcosis, it needs to develop the further test with more agencies joining after the work of the institutional code matching completion and the system service improvement in the next stage.

  6. Advanced Stirling Convertor Dual Convertor Controller Testing at NASA Glenn Research Center in the Radioisotope Power Systems System Integration Laboratory

    Science.gov (United States)

    Dugala, Gina M.; Taylor, Linda M.; Bell, Mark E.; Dolce, James L.; Fraeman, Martin; Frankford, David P.

    2015-01-01

    NASA Glenn Research Center developed a nonnuclear representation of a Radioisotope Power System (RPS) consisting of a pair of Advanced Stirling Convertors (ASCs), Dual Convertor Controller (DCC) EMs (engineering models) 2 and 3, and associated support equipment, which were tested in the Radioisotope Power Systems System Integration Laboratory (RSIL). The DCC was designed by the Johns Hopkins University Applied Physics Laboratory (JHU/APL) to actively control a pair of ASCs. The first phase of testing included a Dual Advanced Stirling Convertor Simulator (DASCS), which was developed by JHU/APL and simulates the operation and electrical behavior of a pair of ASCs in real time via a combination of hardware and software. RSIL provides insight into the electrical interactions between a representative radioisotope power generator, its associated control schemes, and realistic electric system loads. The first phase of integration testing included the following spacecraft bus configurations: capacitive, battery, and super-capacitor. A load profile, created based on data from several missions, tested the RPS's and RSIL's ability to maintain operation during load demands above and below the power provided by the RPS. The integration testing also confirmed the DCC's ability to disconnect from the spacecraft when the bus voltage dipped below 22 volts or exceeded 36 volts. Once operation was verified with the DASCS, the tests were repeated with actual operating ASCs. The goal of this integration testing was to verify operation of the DCC when connected to a spacecraft and to verify the functionality of the newly designed RSIL. The results of these tests are presented in this paper.

  7. Integrated Laser Characterization, Data Acquisition, and Command and Control Test System

    Science.gov (United States)

    Stysley, Paul; Coyle, Barry; Lyness, Eric

    2012-01-01

    Satellite-based laser technology has been developed for topographical measurements of the Earth and of other planets. Lasers for such missions must be highly efficient and stable over long periods in the temperature variations of orbit. In this innovation, LabVIEW is used on an Apple Macintosh to acquire and analyze images of the laser beam as it exits the laser cavity to evaluate the laser s performance over time, and to monitor and control the environmental conditions under which the laser is tested. One computer attached to multiple cameras and instruments running LabVIEW-based software replaces a conglomeration of computers and software packages, saving hours in maintenance and data analysis, and making very longterm tests possible. This all-in-one system was written primarily using LabVIEW for Mac OS X, which allows the combining of data from multiple RS-232, USB, and Ethernet instruments for comprehensive laser analysis and control. The system acquires data from CCDs (charge coupled devices), power meters, thermistors, and oscilloscopes over a controllable period of time. This data is saved to an html file that can be accessed later from a variety of data analysis programs. Also, through the LabVIEW interface, engineers can easily control laser input parameters such as current, pulse width, chiller temperature, and repetition rates. All of these parameters can be adapted and cycled over a period of time.

  8. Test of the CMS microstrip silicon tracker readout and control system

    CERN Document Server

    Zghiche, A

    2001-01-01

    The Microstrip Silicon tracker of the CMS detector is designed to provide robust particle tracking and vertex reconstruction within a strong magnetic field in the high luminosity environment of the LHC. The Tracker readout system employs Front-End Driver cards to digitize and buffer the analogue data arriving via optical links from on detector pipeline chips. The control chain of the front-end electronic is built to operate via optical fibers in order to shield the communications from the outside noise. Components close to the final design have been assembled to be tested in the X5 beam area at CERN where a dedicated 25 ns temporal structure beam has been made available by the SPS. This paper describes the hardware and the software developed for readout and control of data acquired by the front-end electronics operating at 40 MHz, Some preliminary results of the tests performed in the 25 ns beam are also given. (8 refs).

  9. FIELD TEST PROGRAM TO DEVELOP COMPREHENSIVE DESIGN, OPERATING, AND COST DATA FOR MERCURY CONTROL SYSTEMS

    Energy Technology Data Exchange (ETDEWEB)

    Michael D. Durham

    2003-05-01

    With the Nation's coal-burning utilities facing the possibility of tighter controls on mercury pollutants, the U.S. Department of Energy is funding projects that could offer power plant operators better ways to reduce these emissions at much lower costs. Mercury is known to have toxic effects on the nervous system of humans and wildlife. Although it exists only in trace amounts in coal, mercury is released when coal burns and can accumulate on land and in water. In water, bacteria transform the metal into methylmercury, the most hazardous form of the metal. Methylmercury can collect in fish and marine mammals in concentrations hundreds of thousands times higher than the levels in surrounding waters. One of the goals of DOE is to develop technologies by 2005 that will be capable of cutting mercury emissions 50 to 70 percent at well under one-half of today's costs. ADA Environmental Solutions (ADA-ES) is managing a project to test mercury control technologies at full scale at four different power plants from 2000--2003. The ADA-ES project is focused on those power plants that are not equipped with wet flue gas desulfurization systems. ADA-ES has developed a portable system that will be tested at four different utility power plants. Each of the plants is equipped with either electrostatic precipitators or fabric filters to remove solid particles from the plant's flue gas. ADA-ES's technology will inject a dry sorbent, such as activated carbon, which removes the mercury and makes it more susceptible to capture by the particulate control devices. A fine water mist may be sprayed into the flue gas to cool its temperature to the range where the dry sorbent is most effective. PG&E National Energy Group is providing two test sites that fire bituminous coals and both are equipped with electrostatic precipitators and carbon/ash separation systems. Wisconsin Electric Power Company is providing a third test site that burns Powder River Basin (PRB) coal and

  10. Space station environmental control and life support systems test bed program - an overview

    Science.gov (United States)

    Behrend, Albert F.

    As the National Aeronautics and Space Administration (NASA) begins to intensify activities for development of the Space Station, decisions must be made concerning the technical state of the art that will be baselined for the initial Space Station system. These decisions are important because significant potential exists for enhancing system performance and for reducing life-cycle costs. However, intelligent decisions cannot be made without an adequate assessment of new and ready technologies, i.e., technologies which are sufficiently mature to allow predevelopment demonstrations to prove their application feasibility and to quantify the risk associated with their development. Therefore, the NASA has implemented a technology development program which includes the establishment of generic test bed capabilities in which these new technologies and approaches can be tested at the prototype level. One major Space Station subsystem discipline in which this program has been implemented is the environmental control and life support system (ECLSS). Previous manned space programs such as Gemini, Apollo, and Space Shuttle have relied heavily on consumables to provide environmental control and life support services. However, with the advent of a long-duration Space Station, consumables must be reduced within technological limits to minimize Space Station resupply penalties and operational costs. The use of advanced environmental control and life support approaches involving regenerative processes offers the best solution for significant consumables reduction while also providing system evolutionary growth capability. Consequently, the demonstration of these "new technologies" as viable options for inclusion in the baseline that will be available to support a Space Station initial operational capability in the early 1990's becomes of paramount importance. The mechanism by which the maturity of these new regenerative life support technologies will be demonstrated is the Space

  11. Advanced Stirling Convertor Control Unit Testing at NASA Glenn Research Center in the Radioisotope Power Systems System Integration Laboratory

    Science.gov (United States)

    Dugala, Gina M.; Taylor, Linda M.; Kussmaul, Michael; Casciani, Michael; Brown, Gregory; Wiser, Joel

    2017-01-01

    Future NASA missions could include establishing Lunar or Martian base camps, exploring Jupiters moons and travelling beyond where generating power from sunlight may be limited. Radioisotope Power Systems (RPS) provide a dependable power source for missions where inadequate sunlight or operational requirements make other power systems impractical. Over the past decade, NASA Glenn Research Center (GRC) has been supporting the development of RPSs. The Advanced Stirling Radioisotope Generator (ASRG) utilized a pair of Advanced Stirling Convertors (ASC). While flight development of the ASRG has been cancelled, much of the technology and hardware continued development and testing to guide future activities. Specifically, a controller for the convertor(s) is an integral part of a Stirling-based RPS. For the ASRG design, the controller maintains stable operation of the convertors, regulates the alternating current produced by the linear alternator of the convertor, provides a specified direct current output voltage for the spacecraft, synchronizes the piston motion of the two convertors in order to minimize vibration as well as manage and maintain operation with a stable piston amplitude and hot end temperature. It not only provides power to the spacecraft but also must regulate convertor operation to avoid damage to internal components and maintain safe thermal conditions after fueling. Lockheed Martin Coherent Technologies has designed, developed and tested an Engineering Development Unit (EDU) Advanced Stirling Convertor Control Unit (ACU) to support this effort. GRC used the ACU EDU as part of its non-nuclear representation of a RPS which also consists of a pair of Dual Advanced Stirling Convertor Simulator (DASCS), and associated support equipment to perform a test in the Radioisotope Power Systems System Integration Laboratory (RSIL). The RSIL was designed and built to evaluate hardware utilizing RPS technology. The RSIL provides insight into the electrical

  12. Beam Tests of a New Digital Beam Control System for the CERN LEIR Accelerator

    CERN Document Server

    Angoletta, Maria Elena; Blas, Alfred; De Long, Joseph; Findlay, Alan; Matuszkiewicz, Pawel; Pedersen, Flemming; Salom-Sarasqueta, Angela

    2005-01-01

    The Low Energy Ion Ring (LEIR) is a major component in the Large Hadron Collider ion injector chain. We have been developing an all-digital beam control and cavity servo system for the RF acceleration in LEIR. The system is housed by VME motherboards that may hold various daughter boards. Fast tasks are executed in Field Programmable Gate Arrays (FPGAs), slower tasks and communication with the software layer above are achieved in Digital Signal Processors (DSPs). We describe a simplified system prototype, which we tested with low intensity beams on the CERN PS Booster (PSB). The aim was to verify the combined DSP+FPGA architecture and the feedback loop dynamics. An additional goal was to deploy and validate novel software concepts, such as reference-functions and timings generation, and user-selectable digital data acquisition.

  13. PS BOOSTER BEAM TESTS OF THE NEW DIGITAL BEAM CONTROL SYSTEM FOR LEIR

    CERN Document Server

    Angoletta, Maria Elena; Bento, J; De Long, J H; Findlay, A; Matuszkiewicz, P; Pedersen, F; Salom-Sarasqueta, A; CERN. Geneva. AB Department

    2005-01-01

    We have been developing a scaled-down prototype of the new digital beam control and cavity servoing system for CERN’s Low Energy Ion Ring (LEIR) slated for commissioning in 2005. The system’s hardware and software, developed as part of a CERN-BNL collaboration, are based on new all-digital technology already deployed at BNL's AGS Booster. The system relies on VME modules, carrying Digital Signal Processors (DSPs) as well as Field Programmable Gate Arrays (FPGAs), and daughter cards. New concepts deployed include software implementation, through DSPs & FPGAs, of functions traditionally executed by analogue hardware, such as reference-functions and timings generation. Additionally, a user-selectable digital data acquisition functionality provides diagnostic and troubleshoot access points, a new feature which is very useful in a digital system. The scaled-down prototype implements frequency program, radial steering, phase and radial loops capabilities and it has been tested in CERN's PS Booster (PSB) dur...

  14. Legionella Risk Management and Control in Potable Water Systems: Argument for the Abolishment of Routine Testing.

    Science.gov (United States)

    Whiley, Harriet

    2016-12-24

    Legionella is an opportunistic pathogen of public health significance. One of the main sources of Legionella is potable water systems. As a consequence of aging populations there is an increasing demographic considered at high risk for Legionellosis and, as such, a review of the guidelines is required. Worldwide, Legionella has been detected from many potable water sources, suggesting it is ubiquitous in this environment. Previous studies have identified the limitations of the current standard method for Legionella detection and the high possibility of it returning both false negative and false positive results. There is also huge variability in Legionella test results for the same water sample when conducted at different laboratories. However, many guidelines still recommend the testing of water systems. This commentary argues for the removal of routine Legionella monitoring from all water distribution guidelines. This procedure is financially consuming and false negatives may result in managers being over-confident with a system or a control mechanism. Instead, the presence of the pathogen should be assumed and focus spent on managing appropriate control measures and protecting high-risk population groups.

  15. Testing cleanable/reuseable HEPA prefilters for mixed waste incinerator air pollution control systems

    Energy Technology Data Exchange (ETDEWEB)

    Burns, D.B.; Wong, A.; Walker, B.W.; Paul, J.D. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1997-08-01

    The Consolidated Incineration Facility (CIF) at the US DOE Savannah River Site is undergoing preoperational testing. The CIF is designed to treat solid and liquid RCRA hazardous and mixed wastes from site operations and clean-up activities. The technologies selected for use in the air pollution control system (APCS) were based on reviews of existing incinerators, air pollution control experience, and recommendations from consultants. This approach resulted in a facility design using experience from other operating hazardous/radioactive incinerators. In order to study the CIF APCS prior to operation, a 1/10 scale pilot facility, the Offgas Components Test Facility (OCTF), was constructed and has been in operation since late 1994. Its mission is to demonstrate the design integrity of the CIF APCS and optimize equipment/instrument performance of the full scale production facility. Operation of the pilot facility has provided long-term performance data of integrated systems and critical facility components. This has reduced facility startup problems and helped ensure compliance with facility performance requirements. Technical support programs assist in assuring all stakeholders the CIF can properly treat combustible hazardous, mixed, and low-level radioactive wastes. High Efficiency Particulate Air (HEPA) filters are used to remove hazardous and radioactive particulates from the exhaust gas strewn before being released into the atmosphere. The HEPA filter change-out frequency has been a potential issue and was the first technical issue to be studied at the OCTF. Tests were conducted to evaluate the performance of HEPA filters under different operating conditions. These tests included evaluating the impact on HEPA life of scrubber operating parameters and the type of HEPA prefilter used. This pilot-scale testing demonstrated satisfactory HEPA filter life when using cleanable metal prefilters and high flows of steam and water in the offgas scrubber. 8 figs., 2 tabs.

  16. Structured flowcharts for control logic specification in the Tritium Systems Test Assembly

    International Nuclear Information System (INIS)

    Nielson, C.W.; Claborn, G.W.

    1983-01-01

    The Tritium Systems Test Assembly (TSTA) contains several subsystems employing sophisticated chemical and physical processes to purify, transport, and capture the isotopes of hydrogen. The ultimate responsibility for the correct and safe operation of these subsystems lies with their designers. However, the logic is implemented in a computer system with program control. A means to insure unambiguous specification of the control logic in a form understandable to both the non-programming designers and the software staff was required. The computer programs are written in RATFOR, a language providing clear control structures and powerful symbol definition facilities. However, the actual code was considered unsatisfactory as a means of primary specification by the non-programming designers. On the other hand, simple English language descriptions of the desired behavior were not precise enough to insure correctness. Experimentation with traditional flowcharts proved that they were more difficult to follow than the RATFOR code. On the other hand, the use of structured flowcharts derived from those introduced by Nassi and Shneidermanl have proven to be very powerful. Using simple geometric forms for the basic control structures such as loops and conditional tests, and by using expansion rather than connection as the means of reducing any flowchart to a single page, a specification that is both understandable and precise has been obtained. A computer code automates the production and modification of these flowcharts. Combining these flowcharts with primitive subroutines which hide most of the details of control implementation has provided an effective medium for algorithm specification and validation. Examples of the flowcharts and the language used to specify them will be given

  17. Orion Exploration Flight Test Reaction Control System Jet Interaction Heating Environment from Flight Data

    Science.gov (United States)

    White, Molly E.; Hyatt, Andrew J.

    2016-01-01

    The Orion Multi-Purpose Crew Vehicle (MPCV) Reaction Control System (RCS) is critical to guide the vehicle along the desired trajectory during re-­-entry. However, this system has a significant impact on the convective heating environment to the spacecraft. Heating augmentation from the jet interaction (JI) drives thermal protection system (TPS) material selection and thickness requirements for the spacecraft. This paper describes the heating environment from the RCS on the afterbody of the Orion MPCV during Orion's first flight test, Exploration Flight Test 1 (EFT-1). These jet plumes interact with the wake of the crew capsule and cause an increase in the convective heating environment. Not only is there widespread influence from the jet banks, there may also be very localized effects. The firing history during EFT-1 will be summarized to assess which jet bank interaction was measured during flight. Heating augmentation factors derived from the reconstructed flight data will be presented. Furthermore, flight instrumentation across the afterbody provides the highest spatial resolution of the region of influence of the individual jet banks of any spacecraft yet flown. This distribution of heating augmentation across the afterbody will be derived from the flight data. Additionally, trends with possible correlating parameters will be investigated to assist future designs and ground testing programs. Finally, the challenges of measuring JI, applying this data to future flights and lessons learned will be discussed.

  18. Development, field testing and implementation of automated hydraulically controlled, variable volume loading systems for reciprocating compressors

    Energy Technology Data Exchange (ETDEWEB)

    Hickman, Dwayne A. [ACI Services, Inc., Cambridge, OH (United States); Slupsky, John [Kvaerner Process Systems, Calgary, Alberta (Canada); Chrisman, Bruce M.; Hurley, Tom J. [Cooper Energy Services, Oklahoma City, OK (United States). Ajax Division

    2003-07-01

    Automated, variable volume unloaders provide the ability to smoothly load/unload reciprocating compressors to maintain ideal operations in ever-changing environments. Potential advantages provided by this load control system include: maximizing unit capacity, optimizing power economy, maintaining low exhaust emissions, and maintaining process suction and discharge pressures. Obstacles foreseen include: reliability, stability, serviceability and automation integration. Results desired include: increased productivity for the compressor and its operators, increased up time, and more stable process control. This presentation covers: system design features with descriptions of how different types of the devices were developed, initial test data, and how they can be effectively operated; three actual-case studies detailing the reasons why automated, hydraulically controlled, variable volume, head-end unloaders were chosen over other types of unloading devices; sophisticated software used in determining the device sizing and predicted performance; mechanical and field considerations; installation, serviceability and operating considerations; device control issues, including PC and PLC considerations; monitoring of actual performance and comparison of such with predicted performance; analysis of mechanical reliability and stability; and preliminary costs versus return on investment analysis. (author)

  19. ETV TEST REPORT OF MOBILE SOURCE EMISSIONS CONTROL DEVICES: LUBRIZOL ENGINE CONTROL SYSTEMS PURIFILTER SC17L

    Science.gov (United States)

    The Environmental Technology Verification report discusses the technology and performance of the Lubrizol Engine Control Systems Purifilter SC17L manufactured by Lubrizol Engine Control Systems. The technology is a precious and base metal, passively regenerated particulate filter...

  20. Reliable Decentralized Control of Fuzzy Discrete-Event Systems and a Test Algorithm.

    Science.gov (United States)

    Liu, Fuchun; Dziong, Zbigniew

    2013-02-01

    A framework for decentralized control of fuzzy discrete-event systems (FDESs) has been recently presented to guarantee the achievement of a given specification under the joint control of all local fuzzy supervisors. As a continuation, this paper addresses the reliable decentralized control of FDESs in face of possible failures of some local fuzzy supervisors. Roughly speaking, for an FDES equipped with n local fuzzy supervisors, a decentralized supervisor is called k-reliable (1 ≤ k ≤ n) provided that the control performance will not be degraded even when n - k local fuzzy supervisors fail. A necessary and sufficient condition for the existence of k-reliable decentralized supervisors of FDESs is proposed by introducing the notions of M̃uc-controllability and k-reliable coobservability of fuzzy language. In particular, a polynomial-time algorithm to test the k-reliable coobservability is developed by a constructive methodology, which indicates that the existence of k-reliable decentralized supervisors of FDESs can be checked with a polynomial complexity.

  1. Single-crate stand-alone CAMAC control system for a negative ion source test facility

    International Nuclear Information System (INIS)

    Juras, R.C.; Ziegler, N.F.

    1979-01-01

    A single-crate CAMAC system was configured to control a negative ion source development facility at ORNL and control software was written for the crate microcomputer. The software uses inputs from a touch panel and a shaft encoder to control the various operating parameters of the test facility and uses the touch panel to display the operating status. Communication to and from the equipment at ion source potential is accomplished over optical fibers from an ORNL-built CAMAC module. A receiver at ion source potential stores the transmitted data and some of these stored values are then used to control discrete parameters of the ion source (i.e., power supply on or off). Other stored values are sent to a multiplexed digital-to-analog converter to provide analog control signals. A transmitter at ion source potential transmits discrete status information and several channels of analog data from an analog-to-digital converter back to the ground-potential receiver where it is stored to be read and displayed by the software

  2. Interoperability of remote handling control system software modules at Divertor Test Platform 2 using middleware

    International Nuclear Information System (INIS)

    Tuominen, Janne; Rasi, Teemu; Mattila, Jouni; Siuko, Mikko; Esque, Salvador; Hamilton, David

    2013-01-01

    Highlights: ► The prototype DTP2 remote handling control system is a heterogeneous collection of subsystems, each realizing a functional area of responsibility. ► Middleware provides well-known, reusable solutions to problems, such as heterogeneity, interoperability, security and dependability. ► A middleware solution was selected and integrated with the DTP2 RH control system. The middleware was successfully used to integrate all relevant subsystems and functionality was demonstrated. -- Abstract: This paper focuses on the inter-subsystem communication channels in a prototype distributed remote handling control system at Divertor Test Platform 2 (DTP2). The subsystems are responsible for specific tasks and, over the years, their development has been carried out using various platforms and programming languages. The communication channels between subsystems have different priorities, e.g. very high messaging rate and deterministic timing or high reliability in terms of individual messages. Generally, a control system's communication infrastructure should provide interoperability, scalability, performance and maintainability. An attractive approach to accomplish this is to use a standardized and proven middleware implementation. The selection of a middleware can have a major cost impact in future integration efforts. In this paper we present development done at DTP2 using the Object Management Group's (OMG) standard specification for Data Distribution Service (DDS) for ensuring communications interoperability. DDS has gained a stable foothold especially in the military field. It lacks a centralized broker, thereby avoiding a single-point-of-failure. It also includes an extensive set of Quality of Service (QoS) policies. The standard defines a platform- and programming language independent model and an interoperability wire protocol that enables DDS vendor interoperability, allowing software developers to avoid vendor lock-in situations

  3. Interoperability of remote handling control system software modules at Divertor Test Platform 2 using middleware

    Energy Technology Data Exchange (ETDEWEB)

    Tuominen, Janne, E-mail: janne.m.tuominen@tut.fi [Tampere University of Technology, Department of Intelligent Hydraulics and Automation, Tampere (Finland); Rasi, Teemu; Mattila, Jouni [Tampere University of Technology, Department of Intelligent Hydraulics and Automation, Tampere (Finland); Siuko, Mikko [VTT, Technical Research Centre of Finland, Tampere (Finland); Esque, Salvador [F4E, Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla2, 08019, Barcelona (Spain); Hamilton, David [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France)

    2013-10-15

    Highlights: ► The prototype DTP2 remote handling control system is a heterogeneous collection of subsystems, each realizing a functional area of responsibility. ► Middleware provides well-known, reusable solutions to problems, such as heterogeneity, interoperability, security and dependability. ► A middleware solution was selected and integrated with the DTP2 RH control system. The middleware was successfully used to integrate all relevant subsystems and functionality was demonstrated. -- Abstract: This paper focuses on the inter-subsystem communication channels in a prototype distributed remote handling control system at Divertor Test Platform 2 (DTP2). The subsystems are responsible for specific tasks and, over the years, their development has been carried out using various platforms and programming languages. The communication channels between subsystems have different priorities, e.g. very high messaging rate and deterministic timing or high reliability in terms of individual messages. Generally, a control system's communication infrastructure should provide interoperability, scalability, performance and maintainability. An attractive approach to accomplish this is to use a standardized and proven middleware implementation. The selection of a middleware can have a major cost impact in future integration efforts. In this paper we present development done at DTP2 using the Object Management Group's (OMG) standard specification for Data Distribution Service (DDS) for ensuring communications interoperability. DDS has gained a stable foothold especially in the military field. It lacks a centralized broker, thereby avoiding a single-point-of-failure. It also includes an extensive set of Quality of Service (QoS) policies. The standard defines a platform- and programming language independent model and an interoperability wire protocol that enables DDS vendor interoperability, allowing software developers to avoid vendor lock-in situations.

  4. Development and Flight Test of an Emergency Flight Control System Using Only Engine Thrust on an MD-11 Transport Airplane

    Science.gov (United States)

    Burcham, Frank W., Jr.; Burken, John J.; Maine, Trindel A.; Fullerton, C. Gordon

    1997-01-01

    An emergency flight control system that uses only engine thrust, called the propulsion-controlled aircraft (PCA) system, was developed and flight tested on an MD-11 airplane. The PCA system is a thrust-only control system, which augments pilot flightpath and track commands with aircraft feedback parameters to control engine thrust. The PCA system was implemented on the MD-11 airplane using only software modifications to existing computers. Results of a 25-hr flight test show that the PCA system can be used to fly to an airport and safely land a transport airplane with an inoperative flight control system. In up-and-away operation, the PCA system served as an acceptable autopilot capable of extended flight over a range of speeds, altitudes, and configurations. PCA approaches, go-arounds, and three landings without the use of any normal flight controls were demonstrated, including ILS-coupled hands-off landings. PCA operation was used to recover from an upset condition. The PCA system was also tested at altitude with all three hydraulic systems turned off. This paper reviews the principles of throttles-only flight control, a history of accidents or incidents in which some or all flight controls were lost, the MD-11 airplane and its systems, PCA system development, operation, flight testing, and pilot comments.

  5. Preliminary flight test results of a fly-by-throttle emergency flight control system on an F-15 airplane

    Science.gov (United States)

    Burcham, Frank W., Jr.; Maine, Trindel A.; Fullerton, C. G.; Wells, Edward A.

    1993-01-01

    A multi-engine aircraft, with some or all of the flight control system inoperative, may use engine thrust for control. NASA Dryden has conducted a study of the capability and techniques for this emergency flight control method for the F-15 airplane. With an augmented control system, engine thrust, along with appropriate feedback parameters, is used to control flightpath and bank angle. Extensive simulation studies have been followed by flight tests. This paper discusses the principles of throttles-only control, the F-15 airplane, the augmented system, and the flight results including landing approaches with throttles-only control to within 10 ft of the ground.

  6. SIMCON 3.1. LLRF system control board measurements (for TESLA Test Facility)

    International Nuclear Information System (INIS)

    Pietrasik, R.

    2006-03-01

    The SIMCON control systems for superconducting cavity resonators are described. These systems consist of analog and digital I/O systems, a clock system, an Ethernet link, optical input systems, a RS232 interface, a VME section with booting FPGA devices, and a Virtex2Pro section. The measurements of different parameters by this system are described. (HSI)

  7. SIMCON 3.1. LLRF system control board measurements (for TESLA Test Facility)

    Energy Technology Data Exchange (ETDEWEB)

    Pietrasik, R.

    2006-07-15

    The SIMCON control systems for superconducting cavity resonators are described. These systems consist of analog and digital I/O systems, a clock system, an Ethernet link, optical input systems, a RS232 interface, a VME section with booting FPGA devices, and a Virtex2Pro section. The measurements of different parameters by this system are described. (HSI)

  8. Stress Testing of an Artificial Pancreas System With Pizza and Exercise Leads to Improvements in the System's Fuzzy Logic Controller.

    Science.gov (United States)

    Mauseth, Richard; Lord, Sandra M; Hirsch, Irl B; Kircher, Robert C; Matheson, Don P; Greenbaum, Carla J

    2015-09-14

    Under controlled conditions, the Dose Safety artificial pancreas (AP) system controller, which utilizes "fuzzy logic" (FL) methodology to calculate and deliver appropriate insulin dosages based on changes in blood glucose, successfully managed glycemic excursions. The aim of this study was to show whether stressing the system with pizza (high carbohydrate/high fat) meals and exercise would reveal deficits in the performance of the Dose Safety FL controller (FLC) and lead to improvements in the dosing matrix. Ten subjects with type 1 diabetes (T1D) were enrolled and participated in 30 studies (17 meal, 13 exercise) using 2 versions of the FLC. After conducting 13 studies with the first version (FLC v2.0), interim results were evaluated and the FLC insulin-dosing matrix was modified to create a new controller version (FLC v2.1) that was validated through regression testing using v2.0 CGM datasets prior to its use in clinical studies. The subsequent 17 studies were performed using FLC v2.1. Use of FLC v2.1 vs FLC v2.0 in the pizza meal tests showed improvements in mean blood glucose (205 mg/dL vs 232 mg/dL, P = .04). FLC v2.1 versus FLC v2.0 in exercise tests showed improvements in mean blood glucose (146 mg/dL vs 201 mg/dL, P = .004), percentage time spent >180 mg/dL (19.3% vs 46.7%, P = .001), and percentage time spent 70-180 mg/dL (80.0% vs 53.3%, P = .002). Stress testing the AP system revealed deficits in the FLC performance, which led to adjustments to the dosing matrix followed by improved FLC performance when retested. © 2015 Diabetes Technology Society.

  9. The PLATO Dome A site-testing observatory: Power generation and control systems

    Science.gov (United States)

    Lawrence, J. S.; Ashley, M. C. B.; Hengst, S.; Luong-van, D. M.; Storey, J. W. V.; Yang, H.; Zhou, X.; Zhu, Z.

    2009-06-01

    The atmospheric conditions above Dome A, a currently unmanned location at the highest point on the Antarctic plateau, are uniquely suited to astronomy. For certain types of astronomy Dome A is likely to be the best location on the planet, and this has motivated the development of the Plateau Observatory (PLATO). PLATO was deployed to Dome A in early 2008. It houses a suite of purpose-built site-testing instruments designed to quantify the benefits of Dome A site for astronomy, and science instruments designed to take advantage of the observing conditions. The PLATO power generation and control system is designed to provide continuous power and heat, and a high-reliability command and communications platform for these instruments. PLATO has run and collected data throughout the winter 2008 season completely unattended. Here we present a detailed description of the power generation, power control, thermal management, instrument interface, and communications systems for PLATO, and an overview of the system performance for 2008.

  10. Validating a UAV artificial intelligence control system using an autonomous test case generator

    Science.gov (United States)

    Straub, Jeremy; Huber, Justin

    2013-05-01

    The validation of safety-critical applications, such as autonomous UAV operations in an environment which may include human actors, is an ill posed problem. To confidence in the autonomous control technology, numerous scenarios must be considered. This paper expands upon previous work, related to autonomous testing of robotic control algorithms in a two dimensional plane, to evaluate the suitability of similar techniques for validating artificial intelligence control in three dimensions, where a minimum level of airspeed must be maintained. The results of human-conducted testing are compared to this automated testing, in terms of error detection, speed and testing cost.

  11. System design description for SY-101 hydrogen mitigation test project data acquisition and control system (DACS-1)

    International Nuclear Information System (INIS)

    Truitt, R.W.; Pounds, T.S.; Smith, S.O.

    1994-01-01

    This document describes the hardware subsystems of the data acquisition and control system (DACS) used in mitigation tests conducted on waste tank SY-101 at the Hanford Nuclear Reservation. The system was designed and implemented by Los Alamos National Laboratory (LANL) and supplied to Westinghouse Hanford Company (WHC). The mitigation testing uses a pump immersed in the waste tank, directed at certain angles and operated at different speeds and time durations. The SY-101 tank has experienced recurrent periodic gas releases of hydrogen, nitrous oxide, ammonia, and (recently discovered) methane. The hydrogen gas represents a danger, as some of the releases are in amounts above the lower flammability limit (LFL). These large gas releases must be mitigated. Several instruments have been added to the tank to monitor the gas compositions, the tank level, the tank temperature, and other parameters. A mixer pump has been developed to stir the tank waste to cause the gases to be released at a slow rate. It is the function of the DACS to monitor those instruments and to control the mixer pump in a safe manner. During FY93 and FY94 the mixer pump was installed with associated testing operations support equipment and a mitigation test project plan was implemented. These activities successfully demonstrated the mixer pump's ability to mitigate the SY-101 tank hydrogen gas hazard

  12. Popov–Belevitch–Hautus type tests for the controllability of linear complementarity systems

    NARCIS (Netherlands)

    Camlibel, M. Kanat

    2007-01-01

    It is well-known that checking certain controllability properties of very simple piecewise linear systems are undecidable problems. This paper deals with the controllability problem of a class of piecewise linear systems, known as linear complementarity systems. By exploiting the underlying

  13. Design and Testing of a Low Cost PID Controller Combined with Inverse Derivative Control Action and Its Application in Voltage Control Systems of DC Generator

    Directory of Open Access Journals (Sweden)

    Subrata CHATTOPADHYAY

    2008-01-01

    Full Text Available A single PID controller in a process control loop may suffer from high frequency oscillations without offset or low frequency oscillation with offset. An inverse derivative control action can eliminate both of these errors. In the present paper, a low cost operational amplifier based PID controller with inverse derivative control action has been described. Its transfer function has been derived and is found to be identical with the form already derived by other workers. It has been tested with a process plant analogue and implemented in the voltage control system of a DC generator. Its transfer function along with its characteristics in a process plant analogue and the load characteristics of DC generator with and without this controller have been determined experimentally and reported in this paper.

  14. Development and Flight Test of an Augmented Thrust-Only Flight Control System on an MD-11 Transport Airplane

    Science.gov (United States)

    Burcham, Frank W., Jr.; Maine, Trindel A.; Burken, John J.; Pappas, Drew

    1996-01-01

    An emergency flight control system using only engine thrust, called Propulsion-Controlled Aircraft (PCA), has been developed and flight tested on an MD-11 airplane. In this thrust-only control system, pilot flight path and track commands and aircraft feedback parameters are used to control the throttles. The PCA system was installed on the MD-11 airplane using software modifications to existing computers. Flight test results show that the PCA system can be used to fly to an airport and safely land a transport airplane with an inoperative flight control system. In up-and-away operation, the PCA system served as an acceptable autopilot capable of extended flight over a range of speeds and altitudes. The PCA approaches, go-arounds, and three landings without the use of any non-nal flight controls have been demonstrated, including instrument landing system-coupled hands-off landings. The PCA operation was used to recover from an upset condition. In addition, PCA was tested at altitude with all three hydraulic systems turned off. This paper reviews the principles of throttles-only flight control; describes the MD-11 airplane and systems; and discusses PCA system development, operation, flight testing, and pilot comments.

  15. Optimal control and performance test of solar-assisted cooling system

    KAUST Repository

    Huang, B.J.

    2010-10-01

    The solar-assisted cooling system (SACH) was developed in the present study. The ejector cooling system (ECS) is driven by solar heat and connected in parallel with an inverter-type air conditioner (A/C). The cooling load can be supplied by the ECS when solar energy is available and the input power of the A/C can be reduced. In variable weather, the ECS will probably operate at off-design condition of ejector and the cooling capability of the ECS can be lost completely. In order to make the ejector operate at critical or non-critical double-choking condition to obtain a better performance, an electronic expansion valve was installed in the suction line of the ejector to regulate the opening of the expansion valve to control the evaporator temperature. This will make the SACH always produce cooling effect even at lower solar radiation periods while the ejector performs at off-design conditions. The energy saving of A/C is experimentally shown 50-70% due to the cooling performance of ECS. The long-term performance test results show that the daily energy saving is around 30-70% as compared to the energy consumption of A/C alone (without solar-driven ECS). The total energy saving of A/C is 52% over the entire test period. © 2010 Elsevier Ltd. All rights reserved.

  16. A programming system for a modular, flexible multicomputer system for the automatic control of automated test equipment

    International Nuclear Information System (INIS)

    Schmidt, J.

    1984-11-01

    The hardware used is operationally directed, consisting of largely self-functioning, micro-computing modules, combined together over a parallel systembus. For communication purposes between the modules and to synchronize their activities a multi microcomputing operating system is being developed which corresponds to the specific demands of computerized process-control (handling of real-word events under real-time conditions and operation of several parallel-running subprocesses). In order to program the user-specific test cycles a programming language has to be made available which can be coordinated with the operational range of specific test equipment in terms of commands and syntax and which can also easily be learned by operators having no specialised knowledge of data processing. With this objective in mind, a structural system is developed in this work, by the aid of which application-oriented programming languages can be implemented. The adaption of the programming system to a wide spectrum of applications in automatic testing is facilitated by its modular structure. The efficiency of the system is demonstrated by means of an industrial pilot-scale implementation. (orig./HP) [de

  17. Controls in new construction reactors-factory testing of the non-safety portion of the Lungmen nuclear power plant distributed control system

    International Nuclear Information System (INIS)

    Wu, Y. S.; Dick, J. W.; Tetirick, C. W.

    2006-01-01

    The construction permit for Taipower's Lungmen Nuclear Units 1 and 2, two ABWR plants, was issued on March 17, 1999[1], The construction of these units is progressing actively at site. The digital I and C system supplied by GE, which is designated as the Distributed Control and Information System (DCIS) in this project, is being implemented primarily at one vendor facility. In order to ensure the reliability, safety and availability of the DCIS, it is required to comprehensively test the whole DCIS in factory. This article describes the test requirements and acceptance criteria for functional testing of the Non-Safety Distributed Control and Information system (DCIS) for Taiwan Power's Lungmen Units 1 and 2 GE selected Invensys as the equipment supplier for this Non-Safety portion of DCIS. The DCIS system of the Lungmen Units is a physically distributed control system. Field transmitters are connected to hard I/O terminal inputs on the Invensys I/A system. Once the signal is digitized on FBMs (Field Bus Modules) in Remote Multiplexing Units (RMUs), the signal is passed into an integrated control software environment. Control is based on the concept of compounds and blocks where each compound is a logical collection of blocks that performs a control function. Each point identified by control compound and block can be individually used throughout the DCIS system by referencing its unique name. In the Lungmen Project control logic and HSI (Human System Interface) requirements are divided into individual process systems called MPLs (Master Parts List). Higher-level Plant Computer System (PCS) algorithms access control compounds and blocks in these MPLs to develop functions. The test requirements and acceptance criteria for the DCIS system of the Lungmen Project are divided into three general categories (see 1,2,3 below) of verification, which in turn are divided into several specific tests: 1. DCIS System Physical Checks a) RMU Test - To confirm that the hard I

  18. Controls in new construction reactors-factory testing of the non-safety portion of the Lungmen nuclear power plant distributed control system

    Energy Technology Data Exchange (ETDEWEB)

    Wu, Y. S. [Taiwan Power Company, 242, Roosevelt Road, Sec. 3, Taipei 100, Taiwan (China); Dick, J. W. [Invensys System Inc., 33 Commercial St., Foxboro, MA 02035 (United States); Tetirick, C. W. [GE Energy, 1989 Little Orchard Street, San Jose, CA 95125-1030 (United States)

    2006-07-01

    The construction permit for Taipower's Lungmen Nuclear Units 1 and 2, two ABWR plants, was issued on March 17, 1999[1], The construction of these units is progressing actively at site. The digital I and C system supplied by GE, which is designated as the Distributed Control and Information System (DCIS) in this project, is being implemented primarily at one vendor facility. In order to ensure the reliability, safety and availability of the DCIS, it is required to comprehensively test the whole DCIS in factory. This article describes the test requirements and acceptance criteria for functional testing of the Non-Safety Distributed Control and Information system (DCIS) for Taiwan Power's Lungmen Units 1 and 2 GE selected Invensys as the equipment supplier for this Non-Safety portion of DCIS. The DCIS system of the Lungmen Units is a physically distributed control system. Field transmitters are connected to hard I/O terminal inputs on the Invensys I/A system. Once the signal is digitized on FBMs (Field Bus Modules) in Remote Multiplexing Units (RMUs), the signal is passed into an integrated control software environment. Control is based on the concept of compounds and blocks where each compound is a logical collection of blocks that performs a control function. Each point identified by control compound and block can be individually used throughout the DCIS system by referencing its unique name. In the Lungmen Project control logic and HSI (Human System Interface) requirements are divided into individual process systems called MPLs (Master Parts List). Higher-level Plant Computer System (PCS) algorithms access control compounds and blocks in these MPLs to develop functions. The test requirements and acceptance criteria for the DCIS system of the Lungmen Project are divided into three general categories (see 1,2,3 below) of verification, which in turn are divided into several specific tests: 1. DCIS System Physical Checks a) RMU Test - To confirm that the hard

  19. Use of the TACL [Thaumaturgic Automated Control Logic] system at CEBAF [Continuous Electron Beam Accelerator Facility] for control of the Cryogenic Test Facility

    International Nuclear Information System (INIS)

    Navarro, E.; Keesee, M.; Bork, R.; Grubb, C.; Lahti, G.; Sage, J.

    1989-01-01

    A logic-based control software system, called Thaumaturgic Automated Control Logic (TACL), is under development at the Continuous Electron Beam Accelerator Facility in Newport News, VA. The first version of the software was placed in service in November, 1987 for control of cryogenics during the first superconducting RF cavity tests at CEBAF. In August, 1988 the control system was installed at the Cryogenic Test Facility (CTF) at CEBAF. CTF generated liquid helium in September, 1988 and is now in full operation for the current round of cavity tests. TACL is providing a powerful and flexible controls environment for the operation of CTF. 3 refs

  20. FIELD TEST PROGRAM TO DEVELOP COMPREHENSIVE DESIGN, OPERATING, AND COST DATA FOR MERCURY CONTROL SYSTEMS

    Energy Technology Data Exchange (ETDEWEB)

    Michael D. Durham

    2004-10-01

    PG&E NEG Salem Harbor Station Unit 1 was successfully tested for applicability of activated carbon injection as a mercury control technology. Test results from this site have enabled a thorough evaluation of mercury control at Salem Harbor Unit 1, including performance, estimated cost, and operation data. This unit has very high native mercury removal, thus it was important to understand the impacts of process variables on native mercury capture. The team responsible for executing this program included plant and PG&E headquarters personnel, EPRI and several of its member companies, DOE, ADA, Norit Americas, Inc., Hamon Research-Cottrell, Apogee Scientific, TRC Environmental Corporation, Reaction Engineering, as well as other laboratories. The technical support of all of these entities came together to make this program achieve its goals. Overall the objectives of this field test program were to determine the mercury control and balance-of-plant impacts resulting from activated carbon injection into a full-scale ESP on Salem Harbor Unit 1, a low sulfur bituminous-coal-fired 86 MW unit. It was also important to understand the impacts of process variables on native mercury removal (>85%). One half of the gas stream was used for these tests, or 43 MWe. Activated carbon, DARCO FGD supplied by NORIT Americas, was injected upstream of the cold side ESP, just downstream of the air preheater. This allowed for approximately 1.5 seconds residence time in the duct before entering the ESP. Conditions tested in this field evaluation included the impacts of the Selective Non-Catalytic Reduction (SNCR) system on mercury capture, of unburned carbon in the fly ash, of adjusting ESP inlet flue gas temperatures, and of boiler load on mercury control. The field evaluation conducted at Salem Harbor looked at several sorbent injection concentrations at several flue gas temperatures. It was noted that at the mid temperature range of 322-327 F, the LOI (unburned carbon) lost some of its

  1. Integrated dry NO{sub x}/SO{sub 2} emissions control system: integrated system test report

    Energy Technology Data Exchange (ETDEWEB)

    Smith, R.A.; Muzio, L.J. [Fossil Energy Research Corp., Laguna Hills, CA (United States); Hunt, T. [Public Service Co. of Colorado, Denver, CO (United States)

    1997-04-01

    The DOE sponsored Integrated Dry NO{sub x}/SO{sub 2} Emissions Control System Program, is a Clean Coal Technology III demonstration, being conducted by Public Service Company of Colorado. The test site is Arapahoe Generating Station Unit 4, a 100 MWe, down-fired utility boiler burning a low-sulfur Western coal. The project goal is to demonstrate up to 70 percent reductions in NO{sub x} and SO{sub 2} emissions through the integration of: (1) down-fired low NO{sub x} burners with overfire air; (2) Selective Non-Catalytic Reduction (SNCR) for additional NO{sub x} removal; and (3) Dry Sorbent Injection (DSI) and duct humidification for SO{sub 2} removal. This report documents the final phase of the test program, in which the overall performance of the integrated system was evaluated. Previous testing has shown that the goal of 70 percent NO{sub x} removal was easily achieved with the combination of low-NO{sub x} burners, overfire air, and urea-based SNCR. Similarly, the ability of the sodium-based DSI system to achieve 70 percent SO{sub 2} removal was also demonstrated previously. The integrated tests demonstrated the synergistic benefit of operating the SNCR and sodium-based DSI systems concurrently. With the automatic control system set to limit the NH{sub 3} emissions to less than 8 ppm, the NO{sub 2} emissions from the sodium-based DSI system were reduced by nominally 50 percent compared to operation with the DSI system alone. Comparably, the combined operation reduced NH{sub 3} emissions, as reflected by a higher urea injection rate for a fixed NH{sub 3} emission limit. With combined DSI and SNCR operation, an ammonia odor problem was encountered around the Unit 4 ash silo (this did not occur with the SNCR system operated alone at comparable NH{sub 3} slip levels). This odor problem is attributed to the sodium changing the rate at which NH{sub 3} is released from the ash when it is wetted for truck transport to the disposal site.

  2. 241-SY-101 data acquisition and control system (DACS) operator interface upgrade operational test report

    International Nuclear Information System (INIS)

    ERMI, A.M.

    1999-01-01

    This procedure provides instructions for readiness of the first portion of the upgraded 241-SY-101 Data Acquisition and Control System (DACS) computer system to provide proper control and monitoring of the mitigation mixer pump and instrumentation installed in the 241-SY-101 underground storage tank will be systematically evaluated by the performance of this procedure

  3. System design description for the SY-101 hydrogen mitigation test project data acquisition and control system (DACS-1)

    International Nuclear Information System (INIS)

    Ermi, A.M.

    1998-01-01

    There is no new activity or procedure associated with the updating of this reference document. The updating of this system design description maintains an agreed upon documentation program initiated within the test program and carried into operations at time of turnover to maintain configuration control as outlined by design authority practicing guidelines. Any changes made to controlled components in the field will be updated after the time of implementation to support the engineers and operators understand, maintain, train to and operate the system. There are no new credible failure modes associated with the updating of information in a support description document. The failure analysis of each change was reviewed at the time of implementation of the Systems Change Request for all the processes changed. This document simply provides a history of implementation and current system status. The incorporation of the two documents, Computer Systems Design Description (HNF-SD-WMCSDD-008) and the Input/Output Channel List (HNF-SD-WM-EL-001), as appendices allow for fewer errors in changes. Because the documents are all together, they will be approved as one document, not three separate entities which could be updated at different times, creating a situation which does not accurately depict field conditions

  4. Acoustic-Modal Testing of the Ares I Launch Abort System Attitude Control Motor Valve

    Science.gov (United States)

    Davis, R. Benjamin; Fischbach, Sean R.

    2010-01-01

    The Attitude Control Motor (ACM) is being developed for use in the Launch Abort System (LAS) of NASA's Ares I launch vehicle. The ACM consists of a small solid rocket motor and eight actuated pintle valves that directionally allocate.thrust_- 1t.has-been- predicted-that significant unsteady. pressure.fluctuations.will.exist. inside the-valves during operation. The dominant frequencies of these oscillations correspond to the lowest several acoustic natural frequencies of the individual valves. An acoustic finite element model of the fluid volume inside the valve has been critical to the prediction of these frequencies and their associated mode shapes. This work describes an effort to experimentally validate the acoustic finite model of the valve with an acoustic modal test. The modal test involved instrumenting a flight-like valve with six microphones and then exciting the enclosed air with a loudspeaker. The loudspeaker was configured to deliver broadband noise at relatively high sound pressure levels. The aquired microphone signals were post-processed and compared to results generated from the acoustic finite element model. Initial comparisons between the test data and the model results revealed that additional model refinement was necessary. Specifically, the model was updated to implement a complex impedance boundary condition at the entrance to the valve supply tube. This boundary condition models the frequency-dependent impedance that an acoustic wave will encounter as it reaches the end of the supply tube. Upon invoking this boundary condition, significantly improved agreement between the test data and the model was realized.

  5. Testing and commissioning the multinode ECRH realtime control system on the FTU tokamak

    International Nuclear Information System (INIS)

    Galperti, C.; Boncagni, L.; Alessi, E.; Sozzi, C.; Nowak, S.; Granucci, G.; Minelli, D.; Marchetto, C.

    2014-01-01

    Highlights: • We conceived, developed and commissioned a distributed multinode control hardware with proven real-time performances. • The adopted hardware solution is modular and reconfigurable. • The adopted software solution is able to host many experimental scenarios and is totally remotely programmable, configurable and testable. • Effective results in on-line MHD instability detection are presented. - Abstract: In tokamak machines, the ECRH heating system is crucial for plasma heating and for stability control. To be reliable, an ECRH control system should be deeply integrated into the supervision and control systems of the machine, and must be interconnected to the diagnostic instruments and the power actuators of the plant. Moreover, several ECRH experiments are under investigation by the community. So, for the sake of efficiency, it should be possible to reprogram a control system on the fly and possibly from remote locations, even during experiment campaigns. This paper presents the new ECRH control system under development at the FTU tokamak. This system consists of multiple units that acquire and process data and are linked through Ethernet and dedicated fiber-optic data links, under a Linux/MARTe framework. This paper also presents open-loop operative results, both about performances of the control system and about signal processing of the diagnostics relevant to MHD control

  6. Testing and commissioning the multinode ECRH realtime control system on the FTU tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Galperti, C., E-mail: galperti@ifp.cnr.it [EURATOM – ENEA – CNR Fusion Association, CNR-IFP, via R. Cozzi 53, 20125 Milan (Italy); Boncagni, L., E-mail: luca.boncagni@enea.it [EURATOM – ENEA – CNR Fusion Association, Frascati Research Center, Division of Fusion Physics, Rome, Frascati (Italy); Alessi, E.; Sozzi, C.; Nowak, S.; Granucci, G.; Minelli, D.; Marchetto, C. [EURATOM – ENEA – CNR Fusion Association, CNR-IFP, via R. Cozzi 53, 20125 Milan (Italy)

    2014-03-15

    Highlights: • We conceived, developed and commissioned a distributed multinode control hardware with proven real-time performances. • The adopted hardware solution is modular and reconfigurable. • The adopted software solution is able to host many experimental scenarios and is totally remotely programmable, configurable and testable. • Effective results in on-line MHD instability detection are presented. - Abstract: In tokamak machines, the ECRH heating system is crucial for plasma heating and for stability control. To be reliable, an ECRH control system should be deeply integrated into the supervision and control systems of the machine, and must be interconnected to the diagnostic instruments and the power actuators of the plant. Moreover, several ECRH experiments are under investigation by the community. So, for the sake of efficiency, it should be possible to reprogram a control system on the fly and possibly from remote locations, even during experiment campaigns. This paper presents the new ECRH control system under development at the FTU tokamak. This system consists of multiple units that acquire and process data and are linked through Ethernet and dedicated fiber-optic data links, under a Linux/MARTe framework. This paper also presents open-loop operative results, both about performances of the control system and about signal processing of the diagnostics relevant to MHD control.

  7. Investigation and realization of an automatic device for the control and test of a photon tagging system

    International Nuclear Information System (INIS)

    Fallou, J.L.

    1987-12-01

    An intelligent control/test equipment for a monoenergetic photon production system was developed. The device enables simulations to be done outside experimental runs. Operation can be entirely automatic, or controlled by the experimenters. The device is modular and conforms to CAMAC standards. The architecture of the system is based around a local bus which comprises a central unit and its memory; a programmable pulse generator; a switching circuit to test and control the various paths; and a unit to communicate with the acquisition system [fr

  8. Design and test of optoelectronic system of alignment control based on CCD camera

    Science.gov (United States)

    Anisimov, A. G.; Gorbachyov, A. A.; Krasnyashchikh, A. V.; Pantushin, A. N.; Timofeev, A. N.

    2008-10-01

    In this work, design, implementation and test of a system intended for positioning of the elements of turbine units relative to the line of shaft with high precision, are discussed. A procedure of the conversion of coordinates from the instrument system into the system connected with the practical position of the axis of turbine has been devised. It is shown that optoelectronic systems of aligment built by autoreflexive scheme can be used for high precision measurements.

  9. Optimal Testing Effort Control for Modular Software System Incorporating The Concept of Independent and Dependent Faults: A Control Theoretic Approach

    Directory of Open Access Journals (Sweden)

    Kuldeep CHAUDHARY

    2012-07-01

    Full Text Available In this paper, we discuss modular software system for Software Reliability GrowthModels using testing effort and study the optimal testing effort intensity for each module. The maingoal is to minimize the cost of software development when budget constraint on testing expenditureis given. We discuss the evolution of faults removal dynamics in incorporating the idea of leading/independent and dependent faults in modular software system under the assumption that testing ofeach of the modulus is done independently. The problem is formulated as an optimal controlproblem and the solution to the proposed problem has been obtained by using Pontryagin MaximumPrinciple.

  10. Sipping machine control system new design to perform integrity of nuclear fuel test in Cofrentes power plant

    Energy Technology Data Exchange (ETDEWEB)

    Palomo, M., E-mail: mpalomo@iqn.upv.es [Departamento de Ingenieria Quimica y Nuclear. Universidad Politecnica de Valencia (Spain); Urrea, M., E-mail: Matias.urrea@iberdrola.es [C.N.Cofrentes - Iberdrola Generacion S.A., Cofrentes, Valencia (Spain); Curiel, M., E-mail: m.curiel@lainsa.com [LAINSA Grupo Dominguis, Valencia (Spain); Arnaldos, A., E-mail: a.arnaldos@titaniast.com [TITANIA Servicios Tecnologicos SL, Grupo Dominguis, Valencia (Spain)

    2011-07-01

    This paper we present is related to SIPPING machine control system new design to perform integrity of nuclear fuel test. This test is a non destructive technique used for evaluating the radiated nuclear fuel coating structural integrity. It is based on the radioactive emission detection of fission elements in the reactor cooling system, using the fuel inspection equipment (SIPPING). SIPPING equipment consists of one simultaneous test bell-shaped vessel of eight fuel elements, and another one for individual element test, a control workstation and some accessories (cables, thermocouples, hoses). SIPPING inspection is carried out by means of fuel element vessel. Through air injection, water flows around the element and heat evacuation is reduced, so fuel elements temperature increases. Those elements with faults shall expelled fission components dissolved in water and/or as a gas component. The project aim is the SIPPING system control design and software based on LabVIEW, for control, monitoring and documentation of the SIPPING Test. This project shall give a major functionality to the system and, at the same time, shall facilitate the user a friendlier and interactive environment allowing: to substitute the present work platform with a real-time electronic system based on cRIO and a control software ad-hoc designed for SIPPING system; to equip new system of a major redundancy for data storage, minimising loss probability of the same. (author)

  11. Sipping machine control system new design to perform integrity of nuclear fuel test in Cofrentes power plant

    Energy Technology Data Exchange (ETDEWEB)

    Curiel, M. [Logistica y Acondicionamientos Industriales SAU, Sorolla Center, local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain); Palomo, M. J. [ISIRYM, Universidad Politecnica de Valencia, Camino de Vera s/n, Valencia (Spain); Urrea, M. [Iberdrola Generacion S. A., Central Nuclear Cofrentes, Carretera Almansa Requena s/n, 04662 Cofrentes, Valencia (Spain); Vaquer, J., E-mail: m.curiel@lainsa.co [TITANIA Servicios Tecnologicos SL, Sorolla Center, local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain)

    2010-10-15

    This paper related to Sipping machine control system new design to perform integrity of nuclear fuel test. This test is a non destructive technique used for evaluating the radiated nuclear fuel coating structural integrity. It is based on the radioactive emission detection of fission elements in the reactor cooling system, using the fuel inspection equipment Sipping. The equipment consists of one simultaneous test bell-shaped vessel of eight fuel elements, and another one for individual element test, a control workstation and some accessories (cables, thermocouples, hoses). Sipping inspection is carried out by means of fuel element vessel. Through air injection, water flows around the element and heat evacuation is reduced, so fuel elements temperature increases. Those elements with faults shall expelled fission components dissolved in water and/or as a gas component. The project aim is the Sipping system control design and software based on LabVIEWTM, for control, monitoring and documentation of the Sipping test. This project shall give a major functionality to the system and, at the same time, shall facilitate the user a friendlier and interactive environment allowing: 1) To substitute the present work platform with a real-time electronic system based on cRIO and a control software ad-hoc designed for Sipping system. 2) To equip new system of a major redundancy for data storage, minimising loss probability of the same. (Author)

  12. Sipping machine control system new design to perform integrity of nuclear fuel test in Cofrentes power plant

    International Nuclear Information System (INIS)

    Curiel, M.; Palomo, M. J.; Urrea, M.; Vaquer, J.

    2010-10-01

    This paper related to Sipping machine control system new design to perform integrity of nuclear fuel test. This test is a non destructive technique used for evaluating the radiated nuclear fuel coating structural integrity. It is based on the radioactive emission detection of fission elements in the reactor cooling system, using the fuel inspection equipment Sipping. The equipment consists of one simultaneous test bell-shaped vessel of eight fuel elements, and another one for individual element test, a control workstation and some accessories (cables, thermocouples, hoses). Sipping inspection is carried out by means of fuel element vessel. Through air injection, water flows around the element and heat evacuation is reduced, so fuel elements temperature increases. Those elements with faults shall expelled fission components dissolved in water and/or as a gas component. The project aim is the Sipping system control design and software based on LabVIEWTM, for control, monitoring and documentation of the Sipping test. This project shall give a major functionality to the system and, at the same time, shall facilitate the user a friendlier and interactive environment allowing: 1) To substitute the present work platform with a real-time electronic system based on cRIO and a control software ad-hoc designed for Sipping system. 2) To equip new system of a major redundancy for data storage, minimising loss probability of the same. (Author)

  13. Initial Stage Reference Search : Driver Simulators to Test Shared Controls, Limited Autonomy Vehicle Systems

    Science.gov (United States)

    2015-09-01

    This literature review and reference scanning focuses on the use of driver simulators for semiautonomous (or shared control) vehicle systems (2012present), including related research from other modes of transportation (e.g., rail or aviation). Foc...

  14. International Space Station Sustaining Engineering: A Ground-Based Test Bed for Evaluating Integrated Environmental Control and Life Support System and Internal Thermal Control System Flight Performance

    Science.gov (United States)

    Ray, Charles D.; Perry, Jay L.; Callahan, David M.

    2000-01-01

    As the International Space Station's (ISS) various habitable modules are placed in service on orbit, the need to provide for sustaining engineering becomes increasingly important to ensure the proper function of critical onboard systems. Chief among these are the Environmental Control and Life Support System (ECLSS) and the Internal Thermal Control System (ITCS). Without either, life onboard the ISS would prove difficult or nearly impossible. For this reason, a ground-based ECLSS/ITCS hardware performance simulation capability has been developed at NASA's Marshall Space Flight Center. The ECLSS/ITCS Sustaining Engineering Test Bed will be used to assist the ISS Program in resolving hardware anomalies and performing periodic performance assessments. The ISS flight configuration being simulated by the test bed is described as well as ongoing activities related to its preparation for supporting ISS Mission 5A. Growth options for the test facility are presented whereby the current facility may be upgraded to enhance its capability for supporting future station operation well beyond Mission 5A. Test bed capabilities for demonstrating technology improvements of ECLSS hardware are also described.

  15. AirSTAR: A UAV Platform for Flight Dynamics and Control System Testing

    Science.gov (United States)

    Jordan, Thomas L.; Foster, John V.; Bailey, Roger M.; Belcastro, Christine M.

    2006-01-01

    As part of the NASA Aviation Safety Program at Langley Research Center, a dynamically scaled unmanned aerial vehicle (UAV) and associated ground based control system are being developed to investigate dynamics modeling and control of large transport vehicles in upset conditions. The UAV is a 5.5% (seven foot wingspan), twin turbine, generic transport aircraft with a sophisticated instrumentation and telemetry package. A ground based, real-time control system is located inside an operations vehicle for the research pilot and associated support personnel. The telemetry system supports over 70 channels of data plus video for the downlink and 30 channels for the control uplink. Data rates are in excess of 200 Hz. Dynamic scaling of the UAV, which includes dimensional, weight, inertial, actuation, and control system scaling, is required so that the sub-scale vehicle will realistically simulate the flight characteristics of the full-scale aircraft. This testbed will be utilized to validate modeling methods, flight dynamics characteristics, and control system designs for large transport aircraft, with the end goal being the development of technologies to reduce the fatal accident rate due to loss-of-control.

  16. Acceptance test guideline for steam turbine control systems. Anahmerichtlinie fuer Regel- und Steuereinrichtungen von Dampfturbinen

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    The acceptances to be obtained during the first operational run, refer to measures proving the functional integrity of the turbine control system and assuring the compliance with the maximum allowable overspeed in case of lead changes or perturbations. The Guideline concerns essentially speed, power, and pressure controllers coupled to generators. It may be appropriately extended to steam turbines serving other purposes.

  17. 241-SY-101 data acquisition and control system (DACS) remote operator interface operational test report

    International Nuclear Information System (INIS)

    ERMI, A.M.

    1999-01-01

    The readiness of the upgraded 241-SY-101 Data Acquisition and Control System (DACS) to provide proper control and monitoring of the mixer pump and instrumentation in tank 241-SY-101 was evaluated by the performance of OTP-440-001. Results of the OTP are reported here

  18. Study on computer-aided control system design platform of 10MW high temperature gas-cooled test reactor

    International Nuclear Information System (INIS)

    Feng Yan; Shi Lei; Sun Yuliang; Luo Shaojie

    2004-01-01

    the 10 MW high temperature gas-cooled test reactor (HTR-10) is the first modular pebble bed reactor built in China, which needs to be researched on engineering design, control study, safety analysis and operator training. An integrated system for simulation, control design and online assistance of the HTR-10 (HTRSIMU) has been developed by the Institute of Nuclear Energy Technology (INET) of Tsinghua University. The HTRSIMU system is based on a high-speed local area network, on which a computer-aided control system design platform (CDP) is developed and combined with the simulating subsystem in order to provide a visualized and convenient tool for the HTR-10 control system design. The CDP has friendly man-machine interface and good expansibility, in which eighteen types of control items are integrated. These control items are divided into two types: linear and non-linear control items. The linear control items include Proportion, Integral, Differential, Inertial, Leed-lag, Oscillation, Pure-lag, Common, PID and Fuzzy, while the non-linear control items include Saturation, Subsection, Insensitive, Backlash, Relay, Insensi-Relay, Sluggish-Relay and Insens-Slug. The CDP provides a visualized platform for control system modeling and the control loop system can be automatically generated and graphically simulated. Users can conveniently design control loop, modify control parameters, study control method, and analyze control results just by clicking mouse buttons. This kind of control system design method can provide a powerful tool and good reference for the actual system operation for HTR-10. A control scheme is also given and studied to demonstrate the functions of the CDP in this article. (author)

  19. Building a test platform for agents in power system control: Experience from SYSLAB

    DEFF Research Database (Denmark)

    Gehrke, Oliver; Bindner, Henrik W.

    2007-01-01

    A tighter integration of information and communication technologies into power grids and a gradual decentralization of control are widely regarded as key responses to the transformation of power systems, even though many different approaches are investigated to achieve this. Lack of system...

  20. The SimPort-based simulators and distributed control systems development, upgrade and testing

    International Nuclear Information System (INIS)

    Danilov, Victor A.; Yanushevich, Dmitry I.; Zenkov, Andrey D.

    2004-01-01

    This paper describes the SimPort computer technology application experience related with power plant simulators and Distributed Control System (DCS) emulators development. The paper presents basic characteristics of the SimPort as a Windows NT-based implementation variety of the developed in RRC 'Kurchatov Institute' math modeling and simulator creation AIS technology. The new approaches and benefits of using simulation for DCS development and, especially upgrade, testing and on plant tuning are presented in the paper briefly. The DCS-inclusive power plant SimPort-based simulators are also considered. The DCS emulation principal problems, solutions and the experience-based DCS emulators development methodology are presented also. The presented technology quality and efficiency as well as presented DCS emulation problem solutions were verified by the smallest power plant full scope computer simulators development man-hours (at least twice lower in comparison with the similar simulators) in combination with the simulators correspondence to the standard and the best quality of nuclear power plant simulators. (Author)

  1. Cavity digital control testing system by Simulink step operation method for TESLA linear accelerator and free electron laser

    Science.gov (United States)

    Czarski, Tomasz; Romaniuk, Ryszard S.; Pozniak, Krzysztof T.; Simrock, Stefan

    2004-07-01

    The cavity control system for the TESLA -- TeV-Energy Superconducting Linear Accelerator project is initially introduced in this paper. The FPGA -- Field Programmable Gate Array technology has been implemented for digital controller stabilizing cavity field gradient. The cavity SIMULINK model has been applied to test the hardware controller. The step operation method has been developed for testing the FPGA device coupled to the SIMULINK model of the analog real plant. The FPGA signal processing has been verified according to the required algorithm of the reference MATLAB controller. Some experimental results have been presented for different cavity operational conditions.

  2. Advanced Motor Control Test Facility for NASA GRC Flywheel Energy Storage System Technology Development Unit

    Science.gov (United States)

    Kenny, Barbara H.; Kascak, Peter E.; Hofmann, Heath; Mackin, Michael; Santiago, Walter; Jansen, Ralph

    2001-01-01

    This paper describes the flywheel test facility developed at the NASA Glenn Research Center with particular emphasis on the motor drive components and control. A four-pole permanent magnet synchronous machine, suspended on magnetic bearings, is controlled with a field orientation algorithm. A discussion of the estimation of the rotor position and speed from a "once around signal" is given. The elimination of small dc currents by using a concurrent stationary frame current regulator is discussed and demonstrated. Initial experimental results are presented showing the successful operation and control of the unit at speeds up to 20,000 rpm.

  3. Development and Flight Testing of a Neural Network Based Flight Control System on the NF-15B Aircraft

    Science.gov (United States)

    Bomben, Craig R.; Smolka, James W.; Bosworth, John T.; Silliams-Hayes, Peggy S.; Burken, John J.; Larson, Richard R.; Buschbacher, Mark J.; Maliska, Heather A.

    2006-01-01

    The Intelligent Flight Control System (IFCS) project at the NASA Dryden Flight Research Center, Edwards AFB, CA, has been investigating the use of neural network based adaptive control on a unique NF-15B test aircraft. The IFCS neural network is a software processor that stores measured aircraft response information to dynamically alter flight control gains. In 2006, the neural network was engaged and allowed to learn in real time to dynamically alter the aircraft handling qualities characteristics in the presence of actual aerodynamic failure conditions injected into the aircraft through the flight control system. The use of neural network and similar adaptive technologies in the design of highly fault and damage tolerant flight control systems shows promise in making future aircraft far more survivable than current technology allows. This paper will present the results of the IFCS flight test program conducted at the NASA Dryden Flight Research Center in 2006, with emphasis on challenges encountered and lessons learned.

  4. Implementation and testing of a fault detection software tool for improving control system performance in a large commercial building

    Energy Technology Data Exchange (ETDEWEB)

    Salsbury, T.I.; Diamond, R.C.

    2000-05-01

    This paper describes a model-based, feedforward control scheme that can detect faults in the controlled process and improve control performance over traditional PID control. The tool uses static simulation models of the system under control to generate feed-forward control action, which acts as a reference of correct operation. Faults that occur in the system cause discrepancies between the feedforward models and the controlled process. The scheme facilitates detection of faults by monitoring the level of these discrepancies. We present results from the first phase of tests on a dual-duct air-handling unit installed in a large office building in San Francisco. We demonstrate the ability of the tool to detect a number of preexisting faults in the system and discuss practical issues related to implementation.

  5. Controller design and test results for a four axis HTS coil based Maglev system

    International Nuclear Information System (INIS)

    Zhou Tong; Xing Huawei

    2007-01-01

    Controller design and experimental results are reported in this paper for a four axis high temperature superconductivity (HTS) coil based electromagnetic levitation (Maglev) system. The HTS coils are made of Bi2223/Ag multifilamentary tapes. It has been experimentally proved that the designed controller works satisfactorily, although the physical parameters of a HTS coil based electromagnet (HTSEM) vary significantly with the frequency of the input voltage. A performance comparison has also been made between the classical lead-lag compensator and the modern H ∼ loop-shaping controller. It becomes clear that robust control theories are capable of providing a controller with better performances, which is in a good agreement with numerical simulations. Moreover, it implies that the particular parameter variation characteristics can be simply dealt with by the available robust control theories that are naturally existent in a HTSEM

  6. Controller design and test results for a four axis HTS coil based Maglev system

    Energy Technology Data Exchange (ETDEWEB)

    Zhou Tong [Department of Automation, Tsinghua University, Beijing 100084 (China)]. E-mail: tzhou@mail.tsinghua.edu.cn; Xing Huawei [Department of Automation, Tsinghua University, Beijing 100084 (China)

    2007-04-15

    Controller design and experimental results are reported in this paper for a four axis high temperature superconductivity (HTS) coil based electromagnetic levitation (Maglev) system. The HTS coils are made of Bi2223/Ag multifilamentary tapes. It has been experimentally proved that the designed controller works satisfactorily, although the physical parameters of a HTS coil based electromagnet (HTSEM) vary significantly with the frequency of the input voltage. A performance comparison has also been made between the classical lead-lag compensator and the modern H{sub {approx}} loop-shaping controller. It becomes clear that robust control theories are capable of providing a controller with better performances, which is in a good agreement with numerical simulations. Moreover, it implies that the particular parameter variation characteristics can be simply dealt with by the available robust control theories that are naturally existent in a HTSEM.

  7. Design of Linear Control System for Wind Turbine Blade Fatigue Testing

    DEFF Research Database (Denmark)

    Toft, Anders; Roe-Poulsen, Bjarke Nørskov; Christiansen, Rasmus

    2016-01-01

    This paper proposes a linear method for wind turbine blade fatigue testing at Siemens Wind Power. The setup consists of a blade, an actuator (motor and load mass) that acts on the blade with a sinusoidal moment, and a distribution of strain gauges to measure the blade flexure. Based...... difficult to control. To make a linear controller, a different approach has been chosen, namely making a controller which is not regulating on the input frequency, but on the input amplitude. A non-linear mechanical model for the blade and the motor has been constructed. This model has been simplified based...... on the desired output, namely the amplitude of the blade. Furthermore, the model has been linearised to make it suitable for linear analysis and control design methods.\\\\ The controller is designed based on a simplified and linearised model, and its gain parameter determined using pole placement. The model...

  8. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project, UAS Control and Non-Payload Communication System Phase-1 Flight Test Results

    Science.gov (United States)

    Griner, James H.

    2014-01-01

    NASA's UAS Integration in the NAS project, has partnered with Rockwell Collins to develop a concept Control and Non-Payload Communication (CNPC) system prototype radio, operating on recently allocated UAS frequency spectrum bands. This prototype radio is being used to validate initial proposed performance requirements for UAS control communications. This presentation will give an overview of the current status of the prototype radio development, and results from phase 1 flight tests conducted during 2013.

  9. Description and Flight Test Results of the NASA F-8 Digital Fly-by-Wire Control System

    Science.gov (United States)

    1975-01-01

    A NASA program to develop digital fly-by-wire (DFBW) technology for aircraft applications is discussed. Phase I of the program demonstrated the feasibility of using a digital fly-by-wire system for aircraft control through developing and flight testing a single channel system, which used Apollo hardware, in an F-8C airplane. The objective of Phase II of the program is to establish a technology base for designing practical DFBW systems. It will involve developing and flight testing a triplex digital fly-by-wire system using state-of-the-art airborne computers, system hardware, software, and redundancy concepts. The papers included in this report describe the Phase I system and its development and present results from the flight program. Man-rated flight software and the effects of lightning on digital flight control systems are also discussed.

  10. Design specifications and test of the HMPID's control system in the ALICE experiment

    CERN Document Server

    Carrone, E

    2001-01-01

    The HMPID (High Momentum Particle Identification Detector) is one of the ALICE subdetectors planned to take data at LHC, starting in 2006. Since ALICE will be located underground, the HMPID will be remotely controlled by a Detector Control System (DCS). In this paper we will present the DCS design, accomplished via GRAFCET (GRAphe Fonctionnel de Commande Etape/Transition), the algorithm to translate into code readable by the PLC (the control device) and the first results of a prototype of the Low Voltage Control System. The results achieved so far prove that this way of proceeding is effective and time saving, since every step of the work is autonomous, making the debugging and updating phases simpler.

  11. Steam turbine power plant having improved testing method and system for turbine inlet valves associated with downstream inlet valves preferably having feedforward position managed control

    International Nuclear Information System (INIS)

    Lardi, F.; Ronnen, U.G.

    1981-01-01

    A throttle valve test system for a large steam turbine functions in a turbine control system to provide throttle and governor valve test operations. The control system operates with a valve management capability to provide for pre-test governor valve mode transfer when desired, and it automatically generates feedforward valve position demand signals during and after valve tests to satisfy test and load control requirements and to provide smooth transition from valve test status to normal single or sequential governor valve operation. A digital computer is included in the control system to provide control and test functions in the generation of the valve position demand signals

  12. Inspection system performance test procedure

    International Nuclear Information System (INIS)

    Jensen, C.E.

    1995-01-01

    This procedure establishes requirements to administer a performance demonstration test. The test is to demonstrate that the double-shell tank inspection system (DSTIS) supplied by the contractor performs in accordance with the WHC-S-4108, Double-Shell Tank Ultrasonic Inspection Performance Specification, Rev. 2-A, January, 1995. The inspection system is intended to provide ultrasonic (UT) and visual data to determine integrity of the Westinghouse Hanford Company (WHC) site underground waste tanks. The robotic inspection system consists of the following major sub-systems (modules) and components: Mobile control center; Deployment module; Cable management assembly; Robot mechanism; Ultrasonic testing system; Visual testing system; Pneumatic system; Electrical system; and Control system

  13. Tests on a mock-up of the feedback controlled matching options of the ITER ICRH system

    International Nuclear Information System (INIS)

    Grine, D.; Vervier, M.; Messiaen, A.; Dumortier, P.

    2009-01-01

    Automatic control of the matching of the ITER ICRH antenna array on a reference load is presently developed and tested for optimization on a low-powered scaled (1:5) mock-up. Resilience to fast load variations is obtained either by 4 Conjugate-T (CT) or 4 quadrature hybrid circuits, the latter being the reference option. The main results are (i) for the CT option: successful implementation of the simultaneous feedback control of 11 actuators for the matching of the 4 CT and for the control of the array toroidal phasing; (ii) for the hybrid option: the matching and the array current control via feedback control of the decouplers and double stub tuners. This system is being progressively implemented and the simultaneous control of matching and antenna current has already been successfully tested on half of the array for heating and current drive phasings.

  14. Performance test of remote controlled engineering vehicle system for CBRN threat. Countermeasure performance for CBRN-environment

    International Nuclear Information System (INIS)

    Naruse, Masahiro; Uemura, Keisuke; Morishita, Masahiro

    2015-01-01

    A research of 'remote controlled engineering vehicle system for CBRN threat' was triggered by the nuclear accident that successively happened after the Great East Japan Earthquake. This project focuses on the remote controlled engineering system that can be used for multi purposes such as debris/obstacle clearing operation or various reconnaissance operation, under CBRN threat. For the remote-controlled engineering vehicle, we conducted a series of validation tests for countermeasure performance for CBRN-environment. As a result, it is proved that the vehicle possess required performances for CBRN threat. (author)

  15. Control rod testing apparatus

    International Nuclear Information System (INIS)

    Gaunt, R.R.; Ashman, C.M.

    1987-01-01

    A control rod testing apparatus is described comprising: a first guide means having a vertical cylindrical opening for grossly guiding a control rod; a second guide means having a vertical cylindrical opening for grossly guiding a control rod. The first and second guide means are supported at axially spaced locations with the openings coaxial; and a substantially cylindrical subassembly having a vertical cylindrical opening therethrough. The subassembly is trapped coaxial with and between the first and second guide means, and the subassembly radially floats with respect to the first and second guide means

  16. FIELD TEST PROGRAM TO DEVELOP COMPREHENSIVE DESIGN, OPERATING, AND COST DATA FOR MERCURY CONTROL SYSTEMS

    Energy Technology Data Exchange (ETDEWEB)

    Michael D. Durham

    2005-03-17

    Brayton Point Unit 1 was successfully tested for applicability of activated carbon injection as a mercury control technology. Test results from this site have enabled a thorough evaluation of the impacts of future mercury regulations to Brayton Point Unit 1, including performance, estimated cost, and operation data. This unit has variable (29-75%) native mercury removal, thus it was important to understand the impacts of process variables and activated carbon on mercury capture. The team responsible for executing this program included: (1) Plant and PG&E National Energy Group corporate personnel; (2) Electric Power Research Institute (EPRI); (3) United States Department of Energy National Energy Technology Laboratory (DOE/NETL); (4) ADA-ES, Inc.; (5) NORIT Americas, Inc.; (6) Apogee Scientific, Inc.; (7) TRC Environmental Corporation; (8) URS Corporation; (9) Quinapoxet Solutions; (10) Energy and Environmental Strategies (EES); and (11) Reaction Engineering International (REI). The technical support of all of these entities came together to make this program achieve its goals. Overall, the objectives of this field test program were to determine the impact of activated carbon injection on mercury control and balance-of-plant processes on Brayton Point Unit 1. Brayton Point Unit 1 is a 250-MW unit that fires a low-sulfur eastern bituminous coal. Particulate control is achieved by two electrostatic precipitators (ESPs) in series. The full-scale tests were conducted on one-half of the flue gas stream (nominally 125 MW). Mercury control sorbents were injected in between the two ESPs. The residence time from the injection grid to the second ESP was approximately 0.5 seconds. In preparation for the full-scale tests, 12 different sorbents were evaluated in a slipstream of flue gas via a packed-bed field test apparatus for mercury adsorption. Results from these tests were used to determine the five carbon-based sorbents that were tested at full-scale. Conditions of interest

  17. Energy Monitoring and Control Systems--Performance Verification and Endurance Test Procedures.

    Science.gov (United States)

    1982-12-01

    EM-; tK2 s) trave h.en loadted in qvstem sit ~rp sm:l , o,1 ti-’.~ -1 rouiitthe factoz’, lest. E.VEF.NT Comnmwid the system to display the status of...contractor correction of all outstanding deficiencies . 163 TEST NO: END-i Page I of 1 OBJECTIVE: To demonstrate EMCS normal mode operation 24 TITLE: Endurance

  18. Special power supply and control system for the gas-cooled fast reactor-core flow test loop

    International Nuclear Information System (INIS)

    Hudson, T.L.

    1981-09-01

    The test bundle in the Gas-Cooled Fast Reactor-Core Flow Test Loop (GCFR-CFTL) requires a source of electrical power that can be controlled accurately and reliably over a wide range of steady-state and transient power levels and skewed power distributions to simulate GCFR operating conditions. Both ac and dc power systems were studied, and only those employing silicon-controlled rectifiers (SCRs) could meet the requirements. This report summarizes the studies, tests, evaluations, and development work leading to the selection. it also presents the design, procurement, testing, and evaluation of the first 500-kVa LMPL supply. The results show that the LMPL can control 60-Hz sine wave power from 200 W to 500 kVA

  19. Randomized controlled trial of supervised patient self-testing of warfarin therapy using an internet-based expert system.

    LENUS (Irish Health Repository)

    Ryan, F

    2009-08-01

    Increased frequency of prothrombin time testing, facilitated by patient self-testing (PST) of the International Normalized Ratio (INR) can improve the clinical outcomes of oral anticoagulation therapy (OAT). However, oversight of this type of management is often difficult and time-consuming for healthcare professionals. This study reports the first randomized controlled trial of an automated direct-to-patient expert system, enabling remote and effective management of patients on OAT.

  20. Flight Flutter Testing of Rotary Wing Aircraft Using a Control System Oscillation Technique

    Science.gov (United States)

    Yen, J. G.; Viswanathan, S.; Matthys, C. G.

    1976-01-01

    A flight flutter testing technique is described in which the rotor controls are oscillated by series actuators to excite the rotor and airframe modes of interest, which are then allowed to decay. The moving block technique is then used to determine the damped frequency and damping variation with rotor speed. The method proved useful for tracking the stability of relatively well damped modes. The results of recently completed flight tests of an experimental soft-in-plane rotor are used to illustrate the technique. Included is a discussion of the application of this technique to investigation of the propeller whirl flutter stability characteristics of the NASA/Army XV-15 VTOL tilt rotor research aircraft.

  1. The heater system monitoring and control of the fuelling machines test rig fluid

    International Nuclear Information System (INIS)

    Iorga, C.; Iorga, H.

    2016-01-01

    The thermo-mechanical hot loop (HL) of the testing rig for the fuelling machines (F/Ms) represents a set of facilities and equipment that perform the pressure, temperature and flow thermo-hydraulic parameters similar to those from the fuel channel for CANDU 600 reactor types. The 2.1 MW electric heater (EH), part of the HL, working under the conditions of a pressure vessel (110 bars) and provides an average temperature of 300°C of the working agent. The monitoring equipment implemented aims to simultaneously control the temperature for each of the 12 modules that compose the EH, without influencing the work logic of the display/recording and protecting existing equipment. This paper presents the structure of the monitoring equipment and its performance obtained after performing the functional tests. (authors)

  2. Performance test of filtering system for controlling the turbidity of secondary cooling water in HANARO

    International Nuclear Information System (INIS)

    Park, Y. C.; Woo, J. S.; Jo, Y. K.; Loo, J. S.; Lim, N. Y.

    2001-01-01

    There is about 80 m 3 /h loss of the secondary cooling water by evaporation, windage and blowdown during the operation of HANARO, 30 MW research reactor. When the secondary cooling water is treated by high Ca-hardness treatment program for minimizing the blowdown loss, only the trubidity exceeds the limit. By adding filtering system it was confirned, through the relation of turbidity and filtering rate of secondary cooling water, that the turbidity is reduced below the limit (5 deg.) by 2 % of filtering rate without blowdown. And it was verified, through the field performace test of filtering system under normal operation condition, that the circulation pumps get proper capacity and that filter units reduce the turbidity below the limit. Therefore, the secondary cooling water can be treated by the high Ca-hardness program and filter system without blowdown

  3. Small test SDHW systems

    DEFF Research Database (Denmark)

    Vejen, Niels Kristian

    1999-01-01

    Three small test SDHW systems was tested in a laboratory test facility.The three SDHW systems where all based on the low flow principe and a mantle tank but the design of the systems where different.......Three small test SDHW systems was tested in a laboratory test facility.The three SDHW systems where all based on the low flow principe and a mantle tank but the design of the systems where different....

  4. Work plan for transition of SY-101 hydrogen mitigation test project data acquisition and control system (DACS-1)

    International Nuclear Information System (INIS)

    McClees, J.; Truitt, R.W.

    1994-01-01

    The purpose of this effort is to transfer operating and maintenance responsibility for the 241-SY-101 data acquisition and control system (DACS-1) from Los Alamos National Laboratory to Westinghouse Hanford Company. This work plan defines the tasks required for a successful turnover. It identifies DACS-1 transition, deliverables, responsible organizations and individuals, interfaces, cost, and schedule. The transition plan will discuss all required hardware, software, documentation, maintenance, operations, and training for use at Hanford Waste Tank 241-SY-101. The transfer of responsibilities for DACS-1 to WHC is contingent on final approval of applicable Acceptance for Beneficial Use documentation by Waste Tank Operations. The DACS-1 was designed to provide data monitoring, display, and storage for Tank 241-SY-101. The DACS-1 also provides alarm and control of all the hydrogen mitigation testing systems, as well as ancillary systems and equipment (HVAC, UPS, etc.) required to achieve safe and reliable operation of the testing systems in the tank

  5. LTCS (Laser Thermal Control System) Test Supporting the Improvement of DeCoM (Deepak Condenser Model)

    Science.gov (United States)

    Patel, Deepak

    2014-01-01

    Thermal and Fluids Analysis Workshop, Cleveland OH. NCTS 19701-14. On Dec 2013 a Loop Heat Pipe (LHP) test was performed as part of the integral Laser Thermal Control System (LTCS). During the balance portion of this testing it was noticed that the LHP was not going to be able to maintain temperature on the operational thermal mass. The test was stopped. After multiple meetings with the LTCS designers, LHP experts (in house and external) it was concluded that gravity was preventing the control heaters to maintain control on the reservoir. A heater was installed onto the liquid return line as part of the fix. After implementing the fix on the liquid return line, the test on May 2014 proved that the system works in vertical orientation using the liquid line heater. Through this testing, the correlation of the Deepak Condenser Model (DeCoM) was possible. This paper describes how well DeCoM predicts the condenser behavior in comparison to the test results of LTCS test.

  6. Guidance, Navigation and Control (GN and C) Design Overview and Flight Test Results from NASA's Max Launch Abort System (MLAS)

    Science.gov (United States)

    Dennehy, Cornelius J.; Lanzi, Raymond J.; Ward, Philip R.

    2010-01-01

    The National Aeronautics and Space Administration Engineering and Safety Center designed, developed and flew the alternative Max Launch Abort System (MLAS) as risk mitigation for the baseline Orion spacecraft launch abort system already in development. The NESC was tasked with both formulating a conceptual objective system design of this alternative MLAS as well as demonstrating this concept with a simulated pad abort flight test. Less than 2 years after Project start the MLAS simulated pad abort flight test was successfully conducted from Wallops Island on July 8, 2009. The entire flight test duration was 88 seconds during which time multiple staging events were performed and nine separate critically timed parachute deployments occurred as scheduled. This paper provides an overview of the guidance navigation and control technical approaches employed on this rapid prototyping activity; describes the methodology used to design the MLAS flight test vehicle; and lessons that were learned during this rapid prototyping project are also summarized.

  7. Experimental validation of control strategies for a microgrid test facility including a storage system and renewable generation sets

    DEFF Research Database (Denmark)

    Baccino, Francesco; Marinelli, Mattia; Silvestro, Federico

    2012-01-01

    The paper is aimed at describing and validating some control strategies in the SYSLAB experimental test facility characterized by the presence of a low voltage network with a 15 kW-190 kWh Vanadium Redox Flow battery system and a 11 kW wind turbine. The generation set is connected to the local...... network and is fully controllable by the SCADA system. The control strategies, implemented on a local pc interfaced to the SCADA, are realized in Matlab-Simulink. The main purpose is to control the charge/discharge action of the storage system in order to present at the point of common coupling...... the desired power or energy profiles....

  8. Development of a quality management system for borehole investigations. (1) Quality assurance and quality control methodology for hydraulic packer testing

    International Nuclear Information System (INIS)

    Takeuchi, Shinji; Kunimaru, Takanori; Ota, Kunio; Frieg, Bernd

    2011-01-01

    A quality assurance and quality control (QA/QC) system for the hydraulic packer tests has been established based on the surface-based investigations at JAEA's underground research laboratories in Mizunami and Horonobe. The established QA/QC system covers field investigations (data acquisition) and data analysis. For the field investigations, the adopted procedure is selection of a test section based on a detail fluid logging and checking with tally list, followed by inspection of test tools such as pressure transducers and shut-in valves, etc., test method selection using a 'sequential hydraulic test' for deciding appropriate method, and finally data quality confirmation by pressure changes and derivatives on a log-log plots during testing. Test event logs should also be described during testing for traceability. For the test data analysis, a quick analysis for rough estimation of hydraulic parameters, and a detailed analysis using type curve and/or numerical analyses are conducted stepwise. The established QA/QC system has been applied to the recent borehole investigations and its efficiency has been confirmed. (author)

  9. Study on simulation, control and online assistance integrated system of 10 MW high temperature gas-cooled test reactor

    International Nuclear Information System (INIS)

    Luo, S.; Shi, L.; Zhu, S.

    2004-01-01

    In order to provide a convenient tool for engineering designed, safety analysis, operator training and control system design of the high temperature gas-cooled test reactor (HTR), an integrated system for simulation, control and online assistance of the HTR-10 has been designed and is still under development by the Institute of Nuclear Energy Technology (INET) of Tsinghua University in China. The whole system is based on a network environment and includes three subsystems: the simulation subsystem (SIMUSUB), the visualized control designed subsystem (VCDSUB) and the online assistance subsystem (OASUB). The SIMUSUB consists of four parts: the simulation calculating server (SCS), the main control client (MCC), the data disposal client (DDC) and the results graphic display client (RGDC), all of which can communicate with each other via network. The SIMUSUB is intended to analyze and calculate the physical processes of the reactor core, the main loop system and the stream generator, etc., as well as to simulate the normal operation and transient accidents, and the result data can be graphically displayed through the RGDC dynamically. The VCDSUB provides a platform for control system modeling where the control flow systems can be automatically generated and graphically simulated. Based on the data from the field bus, the OASUB provides some of the reactor core parameter, which are difficult to measure. This whole system can be used as an educational tool to understand the design and operational characteristics of the HTR-10, and can also provide online supports for operators in the main control room, or as a convenient powerful tool for the control system design. (authors)

  10. Control of quality in the tests of systems of containment of vehicles. Intercomparison of the results of the tests; Control de calidad en los ensayos de sistemas de contencion de vehiculos. Intercomparacion de los resultados de los ensayos

    Energy Technology Data Exchange (ETDEWEB)

    Lopez Ramos, S.

    2009-07-01

    This article tries to offer information on how Central Laboratory of Structures and Materials are made the tests for Marca N of AENOR of the systems of containment of vehicles and its control of external quality. (Author) 15 refs.

  11. Test-system for the control and selection of tests applicable to a weldment and its documentation for assembling the Angra - 2 pipelines

    International Nuclear Information System (INIS)

    Carvalho Nunez, J.I. de; Spiegelberg, N.; Souza Rosa, M. de; Soares Filho, J.C.T.

    1988-01-01

    Due to quality assurance characteristics applicable to the construction of a Nuclear Power Plant, the welding inspection for the piping erection becomes a very well controlled and documented activity. By means of informatic support, a system was developed for the control and selection of testes applicable to a weldment according to the suitable specification. As a result, it is obtained: cost reduction during the project phase, expedition of modifications due to isometric revision, better control and follow-up of inspections activities and piping erection, and the guarantee of the correct interpretation for the applicable specification. (author) [pt

  12. Development and Operation of an Automatic Rotor Trim Control System for use During the UH-60 Individual Blade Control Wind Tunnel Test

    Science.gov (United States)

    Theodore, Colin R.

    2010-01-01

    A full-scale wind tunnel test to evaluate the effects of Individual Blade Control (IBC) on the performance, vibration, noise and loads of a UH-60A rotor was recently completed in the National Full-Scale Aerodynamics Complex (NFAC) 40- by 80-Foot Wind Tunnel [1]. A key component of this wind tunnel test was an automatic rotor trim control system that allowed the rotor trim state to be set more precisely, quickly and repeatably than was possible with the rotor operator setting the trim condition manually. The trim control system was also able to maintain the desired trim condition through changes in IBC actuation both in open- and closed-loop IBC modes, and through long-period transients in wind tunnel flow. This ability of the trim control system to automatically set and maintain a steady rotor trim enabled the effects of different IBC inputs to be compared at common trim conditions and to perform these tests quickly without requiring the rotor operator to re-trim the rotor. The trim control system described in this paper was developed specifically for use during the IBC wind tunnel test

  13. Radiation control monitoring system on the High Temperature Engineering Test Reactor

    International Nuclear Information System (INIS)

    Minowa, Y.; Nakazawa, T.; Sato, K.; Kikuchi, H.; Nomura, T.

    1999-01-01

    Radiation control monitoring system of the HTTR is divided into three subsystems; exhaust monitoring equipment, room air monitoring equipment, dose equivalent rate monitoring equipment. The exhaust monitoring equipment consists of exhaust gas monitors, exhaust dust monitors, and a tritium and carbon sampling device at normal operation of the reactor. Accident gas monitors are also provided for the emergency. The tritium and carbon sampling device uses cupper oxide as a oxidizer, and ethanol amine as a sampling materials which collects continuously tritium and carbon in dust during about one month and is measured by a liquid scintillation counter. The accident gas monitors consist of two channels, for a low and a high range. The high range-gas monitor consists of two ionization chambers: one encloses argon gas and the other encloses xenon gas. Average energy of various gamma-rays, hence, accident exposure dose of the public can be estimated with the comparison of the sensitivity of two kinds of ionization chambers. The dose equivalent rate monitoring equipment consists of silicon semiconductor detectors for gamma-ray, a ionization chamber for gamma-ray, a BF 3 counter for neutron, and accident area monitors which are located in the reactor container. The message of 'check dose !' or 'temporary evacuation !' can be send to the workers in the reactor with a light and a sound. A computer system collects the radiation monitoring data every 10 sec cycle and accumulates them in a server computer. The leakage and the dispersion of helium gas must be taken into account on the radiation control monitoring system of the HTTR. (Suetake, M.)

  14. Simulator testing system (STS)

    International Nuclear Information System (INIS)

    Miller, V.N.

    1990-01-01

    In recent years there has been a greater demand placed on the capabilities and time usage of real-time nuclear plant simulators due to NRC, INPO and utilities requirements. The requirements applied to certification, new simulators, upgrades, modifications, and maintenance of the simulators vary; however, they all require the capabilities of the simulator to be tested whether it is for NRC 10CFR55.45b requirements, ATP testing of new simulators, ATP testing of upgrades with or without panels, adding software/hardware due to plant modifications, or analyzing software/hardware problems on the simulator. This paper describes the Simulator Testing System (STS) which addresses each one of these requirements placed on simulators. Special attention will be given to ATP testing of upgrades without the use of control room panels. The capabilities and applications of the four parts of STS which are the Display Control Software (DCS), Procedure Control Software (PCS), Display Generator Software (DGS) and the Procedure Generator Software (PGS) will be reviewed

  15. Testing on air cleaning systems: Testing of the components in-place tests; Controle des installations d'epuration de l'air essais de conformite des elements: Tests in situ

    Energy Technology Data Exchange (ETDEWEB)

    Billard, F; Brion, J [Commissariat a l' Energie Atomique, Fontenay-aux-Roses (France). Centre d' Etudes Nucleaires

    1967-07-01

    The reliability of air cleaning systems is dependent on testing they are submitted to. Although in-place tests are the most important as they act as final tests upon achieved plants, component tests are necessary too. They allow detection of defective units before they are installed, partition of unit defects from mounting defects and they are more sensitive. For similar reasons, material teats are most useful. The various tests are described, about aerosol filters for one part, iodine trap for the other. The checked features are: materials nature, units sizes, efficiency, air resistance, flammability, humidity resistance, temperature resistance, adsorbent friability, etc... On iodine trapping systems, small check traps, working by-pass with the main trap are periodically subjected to efficiency test. This control allow to cut down the in-place tests frequency, particularly when poisoning from organic vapours is to be feared. (authors) [French] La surete de fonctionnement des installations d'epuratition de l'air esf fonction des controles auxquels ces installations sont soumises. Si les tests in situ sont les plus importants puisqu'ils constituent le controle final de l'installation terminee, les essais de conformite des elements constitutifs sont egalement necessaires. Ils permettent l'elimination d'elements defectueux avant leur mise en place, la discrimination des defauts du montage de ceux de l'element et sont en outre plus sensibles. De meme, le controle des materiaux constitutifs de l'element s'avere fort utile. On decrit les differents controles, d'une part, pour les fittres a aerosols, d'autre part, pour les pieges a iode. Les caracteristiques verifiees sont: nature des materiaux, dimenesions des elements, efficacite, perte de charge, resistance mecanique, inflammabilite, tenue a l'humidite, tenue a la temperature, resistance au detassement des pieges a iode, friabilite du materiau adsorbant, etc... En ce qui concerne les installations de piegeage d

  16. Applied Control Systems Design

    CERN Document Server

    Mahmoud, Magdi S

    2012-01-01

    Applied Control System Design examines several methods for building up systems models based on real experimental data from typical industrial processes and incorporating system identification techniques. The text takes a comparative approach to the models derived in this way judging their suitability for use in different systems and under different operational circumstances. A broad spectrum of control methods including various forms of filtering, feedback and feedforward control is applied to the models and the guidelines derived from the closed-loop responses are then composed into a concrete self-tested recipe to serve as a check-list for industrial engineers or control designers. System identification and control design are given equal weight in model derivation and testing to reflect their equality of importance in the proper design and optimization of high-performance control systems. Readers’ assimilation of the material discussed is assisted by the provision of problems and examples. Most of these e...

  17. An innovative HVAC control system: Implementation and testing in a vehicular cabin.

    Science.gov (United States)

    Fojtlín, Miloš; Fišer, Jan; Pokorný, Jan; Povalač, Aleš; Urbanec, Tomáš; Jícha, Miroslav

    2017-12-01

    Personal vehicles undergo rapid development in every imaginable way. However, a concept of managing a cabin thermal environment remains unchanged for decades. The only major improvement has been an automatic HVAC controller with one user's input - temperature. In this case, the temperature is often deceiving because of thermally asymmetric and dynamic nature of the cabins. As a result, the effects of convection and radiation on passengers are not captured in detail what also reduces the potential to meet thermal comfort expectations. Advanced methodologies are available to assess the cabin environment in a fine resolution (e.g. ISO 14505:2006), but these are used mostly in laboratory conditions. The novel idea of this work is to integrate equivalent temperature sensors into a vehicular cabin in proximity of an occupant. Spatial distribution of the sensors is expected to provide detailed information about the local environment that can be used for personalised, comfort driven HVAC control. The focus of the work is to compare results given by the implemented system and a Newton type thermal manikin. Three different ambient settings were examined in a climate chamber. Finally, the results were compared and a good match of equivalent temperatures was found. Copyright © 2017 Elsevier Ltd. All rights reserved.

  18. Real-time discrete suboptimal control for systems with input and state delays: Experimental tests on a dehydration process.

    Science.gov (United States)

    Rodríguez-Guerrero, Liliam; Santos-Sánchez, Omar-Jacobo; Cervantes-Escorcia, Nicolás; Romero, Hugo

    2017-11-01

    This article presents a suboptimal control strategy with finite horizon for affine nonlinear discrete systems with both state and input delays. The Dynamic Programming Approach is used to obtain the suboptimal control sequence, but in order to avoid the computation of the Bellman functional, a numerical approximation of this function is proposed in every step. The feasibility of our proposal is demonstrated via an experimental test on a dehydration process and the obtained results show a good performance and behavior of this process. Then in order to demonstrate the benefits of using this kind of control strategy, the results are compared with a non optimal control strategy, particularly with respect to results produced by an industrial Proportional Integral Derivative (PID) Honeywell controller, which is tuned using the Ziegler-Nichols method. Copyright © 2017 ISA. Published by Elsevier Ltd. All rights reserved.

  19. Tests on instrumentation and control systems important to safety in nuclear power stations. Systempruefung der leittechnischen Einrichtungen des Sicherheitssystems in Kernkraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    1985-01-01

    The rule applies to the reactor protection system, to the protection and state boundaries, to control devices important to safety, and to danger alarms of the classes S and I. The system inspection of the control devices of the safety system comprises in-service testing and recurrent testing.

  20. Flight Testing of the Space Launch System (SLS) Adaptive Augmenting Control (AAC) Algorithm on an F/A-18

    Science.gov (United States)

    Dennehy, Cornelius J.; VanZwieten, Tannen S.; Hanson, Curtis E.; Wall, John H.; Miller, Chris J.; Gilligan, Eric T.; Orr, Jeb S.

    2014-01-01

    The Marshall Space Flight Center (MSFC) Flight Mechanics and Analysis Division developed an adaptive augmenting control (AAC) algorithm for launch vehicles that improves robustness and performance on an as-needed basis by adapting a classical control algorithm to unexpected environments or variations in vehicle dynamics. This was baselined as part of the Space Launch System (SLS) flight control system. The NASA Engineering and Safety Center (NESC) was asked to partner with the SLS Program and the Space Technology Mission Directorate (STMD) Game Changing Development Program (GCDP) to flight test the AAC algorithm on a manned aircraft that can achieve a high level of dynamic similarity to a launch vehicle and raise the technology readiness of the algorithm early in the program. This document reports the outcome of the NESC assessment.

  1. Development of a LabVIEW-based surface with innovative controls for the control system of the spin-polarized electron test source Photo-CATCH

    Energy Technology Data Exchange (ETDEWEB)

    Roesch, Heidi Ayse; Enders, Joachim; Espig, Martin; Fritzsche, Yuliya; Wagner, Markus [TU Darmstadt, Institut fuer Kernphysik (Germany)

    2016-07-01

    Operations of the spin-polarized electron source of the S-DALINAC will be supported by a photo-cathode activation, test and cleaning system, Photo-CATCH. Besides cathode-performance studies, this teststand produces spin-polarized electron bunches from a GaAs photo-cathode that are then transported, manipulated, and characterized by devices in a low-energy beam line. To set and monitor the various components of the beamline, a control system was developed, based on the EPICS framework. As interfaces, LabVIEW was used in combination with a gamepad as a controlling device.

  2. Models and procedures for interval evaluating the results of control of knowledge in computer systems testing of Navy

    Directory of Open Access Journals (Sweden)

    D. A. Pechnikov

    2018-01-01

    Full Text Available To implement effective military and professional training of Navy specialists, a corresponding educational and material base is needed. As a result of the reduction in the 1990s in the branches of the military-industrial complex developing weapons and equipment for the Navy, the latest models of this technology are now produced not in batches, but in individual copies. The question of the production of training and training samples is not worth it at all. Under these conditions, only virtual analogues of military equipment and weapons, developed by means of information technology, i.e., training and training systems (TOS, can be considered as the only means capable of providing military-professional training. At the modern level of the development of information technologies, testing is the only universal technical means of monitoring the knowledge of students. Procedures for knowledge control in modern computer testing systems do not meet the requirements for them according to the following characteristics: 1 the absence of the possibility of evaluating the error of the test results; 2 the absence of the possibility of stopping testing when the specified reliability of its results is achieved. In order to effectively implement the means of operational criteria-based pedagogical control of knowledge in the process of training specialists of the Navy and to enable joint analysis and processing of evaluations of learning outcomes, it is advisable to implement the following practical recommendations: 1. Formulating the teacher's preferences system regarding the quality of trainee training and the teacher's preferences system in relation to The significance of single test tasks in the test should be considered as the most important The essential steps in preparing a test for practical use. 2. The teacher who first enters the input of his preference systems should check their actual compliance on a sample of 5-10 such test results that cover the full

  3. Resonance test system

    Science.gov (United States)

    Musial, Walter [Boulder, CO; White, Darris [Superior, CO

    2011-05-31

    An apparatus (10) for applying at least one load to a specimen (12) according to one embodiment of the invention may comprise a mass (18). An actuator (20) mounted to the specimen (12) and operatively associated with the mass (18) moves the mass (18) along a linear displacement path (22) that is perpendicular to a longitudinal axis of the specimen (12). A control system (26) operatively associated with the actuator (20) operates the actuator (20) to reciprocate the mass (18) along the linear displacement path (22) at a reciprocating frequency, the reciprocating frequency being about equal to a resonance frequency of the specimen (12) in a test configuration.

  4. A direct CO2 control system for ocean acidification experiments: testing effects on the coralline red algae Phymatolithon lusitanicum

    Directory of Open Access Journals (Sweden)

    Laura Sordo

    2016-09-01

    Full Text Available Most ocean acidification (OA experimental systems rely on pH as an indirect way to control CO2. However, accurate pH measurements are difficult to obtain and shifts in temperature and/or salinity alter the relationship between pH and pCO2. Here we describe a system in which the target pCO2 is controlled via direct analysis of pCO2 in seawater. This direct type of control accommodates potential temperature and salinity shifts, as the target variable is directly measured instead of being estimated. Water in a header tank is permanently re-circulated through an air-water equilibrator. The equilibrated air is then routed to an infrared gas analyzer (IRGA that measures pCO2 and conveys this value to a Proportional-Integral-Derivative (PID controller. The controller commands a solenoid valve that opens and closes the CO2 flush that is bubbled into the header tank. This low-cost control system allows the maintenance of stabilized levels of pCO2 for extended periods of time ensuring accurate experimental conditions. This system was used to study the long term effect of OA on the coralline red algae Phymatolithon lusitanicum. We found that after 11 months of high CO2 exposure, photosynthesis increased with CO2 as opposed to respiration, which was positively affected by temperature. Results showed that this system is adequate to run long-term OA experiments and can be easily adapted to test other relevant variables simultaneously with CO2, such as temperature, irradiance and nutrients.

  5. Agent-Based Modeling for Testing and Designing Novel Decentralized Command and Control System Paradigms

    National Research Council Canada - National Science Library

    Bonabeau, Eric; Hunt, Carl W; Gaudiano, Paolo

    2003-01-01

    Agent-based modeling (ABM) is a recent simulation modeling technique that consists of modeling a system from the bottom up, capturing the interactions taking place between the system's constituent units...

  6. Development and testing of a digital RF control system and development of a modular data acquisition system for the energy stabilisation of the S-DALINAC

    International Nuclear Information System (INIS)

    Araz, Asim

    2009-01-01

    The subject of this thesis was to construct and test a digital radio-frequency control system for the superconducting Darmstadt electron accelerator S-DALINAC. The controller consists of two components, a low-frequency and a high-frequency module. The high-frequency module developed within this framework is constructed from modern integrated circuits that offer, besides enhanced high-frequency properties, a built-in temperature stabilization. Currently, three superconducting cavities are controlled by the new modules via level converters, thus proving the suitability, and reliability in operation. A new low-frequency module was also commissioned during the course of the present work. It is based, in contrast to the existing control loops, not on analogue but on digital signal processing provided by fast Field Programmable Gate Arrays (FPGA). The fast signal processing capabilities of the new low-frequency unit enabled the implementation of a new, compared to the existing circuit, more advanced control algorithm for the digital control. Within this algorithm integral controllers were added to the proportional controllers in the amplitude as well as in the phase control loops. The digital control can now correct smallest residual errors that could not be compensated by the existing proportional controllers. Additionally, the phase control range was increased to ±180 . by the implementation of a vector rotation. Spurious fix points of the control loop were prevented by a modified amplitude modulation. With these two components, namely, the high- and low-frequency module, the first digital radio-frequency control loop for the S-DALINAC was realized and successfully tested, operating on a superconducting cavity. Under typical operation conditions, an amplitude stability of 2.5.10 -4 and a phase stability of 0.28. were demonstrated. Compared to the current control loops this implies an improved amplitude stability by a factor of 8, while the phase stability remains

  7. NIF ICCS Test Controller for Automated and Manual Testing

    International Nuclear Information System (INIS)

    Zielinski, J S

    2007-01-01

    The National Ignition Facility (NIF) Integrated Computer Control System (ICCS) is a large (1.5 MSLOC), hierarchical, distributed system that controls all aspects of the NIF laser [1]. The ICCS team delivers software updates to the NIF facility throughout the year to support shot operations and commissioning activities. In 2006, there were 48 releases of ICCS: 29 full releases, 19 patches. To ensure the quality of each delivery, thousands of manual and automated tests are performed using the ICCS Test Controller test infrastructure. The TestController system provides test inventory management, test planning, automated test execution and manual test logging, release testing summaries and test results search, all through a web browser interface. Automated tests include command line based frameworks server tests and Graphical User Interface (GUI) based Java tests. Manual tests are presented as a checklist-style web form to be completed by the tester. The results of all tests, automated and manual, are kept in a common repository that provides data to dynamic status reports. As part of the 3-stage ICCS release testing strategy, the TestController system helps plan, evaluate and track the readiness of each release to the NIF facility

  8. Drone Control System

    Science.gov (United States)

    1983-01-01

    Drones, subscale vehicles like the Firebees, and full scale retired military aircraft are used to test air defense missile systems. The DFCS (Drone Formation Control System) computer, developed by IBM (International Business Machines) Federal Systems Division, can track ten drones at once. A program called ORACLS is used to generate software to track and control Drones. It was originally developed by Langley and supplied by COSMIC (Computer Software Management and Information Center). The program saved the company both time and money.

  9. Flight Test and Handling Qualities Analysis of a Longitudinal Flight Control System Using Multiobjective Techniques

    National Research Council Canada - National Science Library

    Anderson, John

    1998-01-01

    ...) and AFIT MXTOOLS toolboxes were used to produce the optimal, multiobjective designs. These designs were implemented for flight test on the Calspan VSS I Learjet, simulating the unstable longitudinal dynamics of an F-16 type aircraft...

  10. Performance evaluation testing of wells in the gradient control system at a federally operated Confined Disposal Facility using single well aquifer tests, East Chicago, Indiana

    Science.gov (United States)

    Lampe, David C.; Unthank, Michael D.

    2016-12-08

    The U.S. Geological Survey (USGS) performed tests to evaluate the hydrologic connection between the open interval of the well and the surrounding Calumet aquifer in response to fouling of extraction well pumps onsite. Two rounds of air slug testing were performed on seven monitoring wells and step drawdown and subsequent recovery tests on three extraction wells on a U.S. Army Corps of Engineers Confined Disposal Facility (CDF) in East Chicago, Indiana. The wells were tested in 2014 and again in 2015. The extraction and monitoring wells are part of the gradient control system that establishes an inward gradient around the perimeter of the facility. The testing established a set of protocols that site personnel can use to evaluate onsite well integrity and develop a maintenance procedure to evaluate future well performance.The results of the slug test analysis data indicate that the hydraulic connection of the well screen to the surrounding aquifer material in monitoring wells on the CDF and the reliability of hydraulic conductivity estimates of the surrounding geologic media could be increased by implementing well development maintenance. Repeated air slug tests showed increasing hydraulic conductivity until, in the case of the monitoring wells located outside of the groundwater cutoff wall (MW–4B, MW–11B, MW–14B), the difference in hydraulic conductivity from test to test decreased, indicating the results were approaching the optimal hydraulic connection between the aquifer and the well screen. Hydraulic conductivity values derived from successive tests in monitoring well D40, approximately 0.25 mile south of the CDF, were substantially higher than those derived from wells on the CDF property. Also, values did not vary from test to test like those measured in monitoring wells located on the CDF property, which indicated that a process may be affecting the connectivity of the wells on the CDF property to the Calumet aquifer. Derived hydraulic conductivity

  11. Design and testing of an independently controlled urea SCR retrofit system for the reduction of NOx emissions from marine diesels.

    Science.gov (United States)

    Johnson, Derek R; Bedick, Clinton R; Clark, Nigel N; McKain, David L

    2009-05-15

    Diesel engine emissions for on-road, stationary and marine applications are regulated in the United States via standards set by the Environmental Protection Agency (EPA). A major component of diesel exhaust that is difficult to reduce is nitrogen oxides (NOx). Selective catalytic reduction (SCR) has been in use for many years for stationary applications, including external combustion boilers, and is promising for NOx abatement as a retrofit for mobile applications where diesel compression ignition engines are used. The research presented in this paper is the first phase of a program focused on the reduction of NOx by use of a stand-alone urea injection system, applicable to marine diesel engines typical of work boats (e.g., tugs). Most current urea SCR systems communicate with engine controls to predict NOx emissions based on signals such as torque and engine speed, however many marine engines in use still employ mechanical injection technology and lack electronic communication abilities. The system developed and discussed in this paper controls NOx emissions independentof engine operating parameters and measures NOx and exhaust flow using the following exhaust sensor inputs: absolute pressure, differential pressure, temperature, and NOx concentration. These sensor inputs were integrated into an independent controller and open loop architecture to estimate the necessary amount of urea needed, and the controller uses pulse width modulation (PWM) to power an automotive fuel injector for airless urea delivery. The system was tested in a transient test cell on a 350 hp engine certified at 4 g/bhp-hr of NOx, with a goal of reducing the engine out NOx levels by 50%. NOx reduction capabilities of 41-67% were shown on the non road transient cycle (NRTC) and ICOMIA E5 steady state cycles with system optimization during testing to minimize the dilute ammonia slip to cycle averages of 5-7 ppm. The goal of 50% reduction of NOx can be achieved dependent upon cycle. Further

  12. On Restructurable Control System Theory

    Science.gov (United States)

    Athans, M.

    1983-01-01

    The state of stochastic system and control theory as it impacts restructurable control issues is addressed. The multivariable characteristics of the control problem are addressed. The failure detection/identification problem is discussed as a multi-hypothesis testing problem. Control strategy reconfiguration, static multivariable controls, static failure hypothesis testing, dynamic multivariable controls, fault-tolerant control theory, dynamic hypothesis testing, generalized likelihood ratio (GLR) methods, and adaptive control are discussed.

  13. Computer control in nondestructive testing illustrated by an automatic ultrasonic tube inspection system

    International Nuclear Information System (INIS)

    Gundtoft, H.E.; Nielsen, N.

    1976-06-01

    In Risoe's automatic tube inspection system, data (more than half a million per tube) from ultrasonic dimension measurements and defect inspections are fed into a computer that simultaneously calculates and evaluates the results. (author)

  14. Development of Novel, Optically-Based Instrumentation for Aircraft System Testing and Control, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose to develop a compact, robust, optically-based sensor for making temperature and multi-species concentration measurements in aircraft system ground and...

  15. Digital test objects (D.T.O.) for treatment planning systems quality control in external beam radiotherapy

    International Nuclear Information System (INIS)

    Denis, E.

    2008-04-01

    This work presents the conception and implementation of new automatic and quantitative quality assessment methods for geometric treatment planning in external radiotherapy. Treatment planning Systems (T.P.S.) quality control is mandatory in France and in the world because of encountered risks but the physical tools recommended to lead this quality control are not adapted to the situation. We present a new methodology for control quality based on the definition of Digital Test Objects (D.T.O.) that are directly introduced in the T.P.S. without acquisition device. These D.T.O. are consistently defined in a continuous and discrete modes. The T.P.S. responses to input D.T.O. are compared to theoretical results thanks to figures of merit specifically designed for each elementary control. The tests we carried out during this study allow to validate our solutions for the quality assessment of the auto-contouring, auto-margining, isocenter computation, collimator conformation and digitally reconstructed radiograph generation tools, as well as our solutions for marker positioning, collimator and displayed bean rotation, incidence, divergence and dimensions. Quality assessment solutions we propose are then fast and effective (no acquisition by the device, reduced manipulations), and more precise thanks to the continuous-discrete equivalence realized at the beginning of the modelling

  16. Tritium Systems Test Facility

    International Nuclear Information System (INIS)

    Cafasso, F.A.; Maroni, V.A.; Smith, W.H.; Wilkes, W.R.; Wittenberg, L.J.

    1978-01-01

    This TSTF proposal has two principal objectives. The first objective is to provide by mid-FY 1981 a demonstration of the fuel cycle and tritium containment systems which could be used in a Tokamak Experimental Power Reactor for operation in the mid-1980's. The second objective is to provide a capability for further optimization of tritium fuel cycle and environmental control systems beyond that which is required for the EPR. The scale and flow rates in TSTF are close to those which have been projected for a prototype experimental power reactor (PEPR/ITR) and will permit reliable extrapolation to the conditions found in an EPR. The fuel concentrations will be the same as in an EPR. Demonstrations of individual components of the deuterium-tritium fuel cycle and of monitoring, accountability and containment systems and of a maintenance methodology will be achieved at various times in the FY 1979-80 time span. Subsequent to the individual component demonstrations--which will proceed from tests with hydrogen (and/or deuterium) through tracer levels of tritium to full operational concentrations--a complete test and demonstration of the integrated fuel processing and tritium containment facility will be performed. This will occur near the middle of FY 1981. Two options were considered for the TSTF: (1) The modification of an existing building and (2) the construction of a new facility

  17. Design and Implementation of a Control System for Testing an Experimental Electrical Vehicle

    OpenAIRE

    Miranda Bermejo, Jorge

    2010-01-01

    The Research Institute of Vehicle Engines and Automotive Engineering (IVK) at the University of Stuttgart is developing an experimental electric vehicle. With that vehicle different research topics in the scope of e-mobility will be investigated. Some of these topics are range prediction and optimization issues, adapted control of inverter and electric motor, as well as, different battery charging techniques. The aim of this master thesis is to design and to implement the contr...

  18. Results of breadboard tests withan integrated CO2, humidity and thermal control system

    NARCIS (Netherlands)

    Driel, C. van; Eckhard, F.; Feron, P.H.M.; Rodriguez, A.; Tan, G.B.

    2003-01-01

    Membrane gas absorption and desorption (MGA/MGD) for the removal of CO 2 in manned spacecraft or other enclosed environment is subject of study by Stork and TNO for many years. The system is based on the combination of membrane separation and gas absorption. Advantage of this technology is that the

  19. Mobile Sensor System AGaMon for Breath Control: Numerical Signal Analysis of Ternary Gas Mixtures and First Field Tests

    Directory of Open Access Journals (Sweden)

    Rolf Seifert

    2018-01-01

    Full Text Available An innovative mobile sensor system for breath control in the exhaled air is introduced. In this paper, the application of alcohol control in the exhaled air is considered. This sensor system operates semiconducting gas sensor elements with respect to the application in a thermo-cyclic operation mode. This operation mode leads to so-called conductance-over-time-profiles (CTPs, which are fingerprints of the gas mixture under consideration and can be used for substance identification and concentration determination. Especially for the alcohol control in the exhaled air, ethanol is the leading gas component to be investigated. But, there are also other interfering gas components in the exhaled air, like H2 and acetone, which may influence the measurement results. Therefore, a ternary ethanol-H2-acetone gas mixture was investigated. The establishing of the mathematical calibration model and the data analysis was performed with a newly developed innovative calibration and evaluation procedure called ProSens 3.0. The analysis of ternary ethanol-H2-acetone gas samples with ProSens 3.0 shows a very good substance identification performance and a very good concentration determination of the leading ethanol component. The relative analysis errors for the leading component ethanol were in all considered samples less than 9 %. First field test performed with the sensor system AGaMon shows very promising results.

  20. Design and Control of a Multi-Functional Energy Recovery Power Accumulator Battery Pack Testing System for Electric Vehicles

    Directory of Open Access Journals (Sweden)

    Bo Long

    2014-03-01

    Full Text Available In this paper, aiming at the energy loss and harmonic problems in the conventional power accumulator battery pack testing system (PABPTS, an improved multi-functional energy recovery PABPTS (ERPABPTS for electric vehicles (EVs was proposed. The improved system has the functions of harmonic detection, suppression, reactive compensation and energy recovery. The ERPABPTS, which contains a bi-directional buck-boost direct current (DC-DC converter and a bi-directional alternating current (AC-DC converter with an inductor-capacitor-inductor (LCL type filter interfacing to the AC-grid, is proposed. System configuration and operation principle of the combined system are discussed first, then, the reactive compensation and harmonic suppression controller under balanced grid-voltage condition are presented. Design of a fourth order band-pass Butterworth filter for current harmonic detection is put forward, and the reactive compensator design procedure considering the non-linear load is also illustrated. The proposed scheme is implemented in a 175-kW prototype in the laboratory. Simulation and experimental results show that the combined configuration can effectively realize energy recovery for high accuracy current test requirement, meanwhile, can effectively achieve reactive compensation and current harmonic suppression.

  1. Load Control System Reliability

    Energy Technology Data Exchange (ETDEWEB)

    Trudnowski, Daniel [Montana Tech of the Univ. of Montana, Butte, MT (United States)

    2015-04-03

    This report summarizes the results of the Load Control System Reliability project (DOE Award DE-FC26-06NT42750). The original grant was awarded to Montana Tech April 2006. Follow-on DOE awards and expansions to the project scope occurred August 2007, January 2009, April 2011, and April 2013. In addition to the DOE monies, the project also consisted of matching funds from the states of Montana and Wyoming. Project participants included Montana Tech; the University of Wyoming; Montana State University; NorthWestern Energy, Inc., and MSE. Research focused on two areas: real-time power-system load control methodologies; and, power-system measurement-based stability-assessment operation and control tools. The majority of effort was focused on area 2. Results from the research includes: development of fundamental power-system dynamic concepts, control schemes, and signal-processing algorithms; many papers (including two prize papers) in leading journals and conferences and leadership of IEEE activities; one patent; participation in major actual-system testing in the western North American power system; prototype power-system operation and control software installed and tested at three major North American control centers; and, the incubation of a new commercial-grade operation and control software tool. Work under this grant certainly supported the DOE-OE goals in the area of “Real Time Grid Reliability Management.”

  2. Optimization and test of a digital radio-frequency control system and developments for the EPICS-based accelerator control system at the S-DALINAC

    International Nuclear Information System (INIS)

    Burandt, Christoph Warwick

    2017-01-01

    The first part of this thesis covers multiple extensions of the digital low-level radio-frequency control system of the electron accelerator S-DALINAC. This comprises bringing into regular operation the piezoelectrically driven fine tuners of the superconducting cavities. For this a power supply series has been developed, which is compatible with the existing electronics and can power the piezo elements. Furthermore the flexibility of the radio-frequency control system has been demonstrated on superconducting quarter-wave-resonators of the ion accelerator ALPI. These 160 MHz cavities are quite different to the S-DALINAC's acceleration structures but could be operated successfully with low residual errors in phase and amplitude nevertheless. The second part describes the migration of the accelerator control system to an EPICS-based system. A multitude of devices with a diversity of interfaces and protocols have been integrated and higher-level functionality has been unified. Within the framework of the construction of the third recirculation beam-line, the beam-path-length adjustment mechanism was motorized.

  3. LARGE-SCALE MECURY CONTROL TECHNOLOGY TESTING FOR LIGNITE-FIRED UTILITIES-OXIDATION SYSTEMS FOR WET FGD

    Energy Technology Data Exchange (ETDEWEB)

    Michael J. Holmes; Steven A. Benson; Jeffrey S. Thompson

    2004-03-01

    The Energy & Environmental Research Center (EERC) is conducting a consortium-based effort directed toward resolving the mercury (Hg) control issues facing the lignite industry. Specifically, the EERC team--the EERC, EPRI, URS, ADA-ES, Babcock & Wilcox, the North Dakota Industrial Commission, SaskPower, and the Mercury Task Force, which includes Basin Electric Power Cooperative, Otter Tail Power Company, Great River Energy, Texas Utilities (TXU), Montana-Dakota Utilities Co., Minnkota Power Cooperative, BNI Coal Ltd., Dakota Westmoreland Corporation, and the North American Coal Company--has undertaken a project to significantly and cost-effectively oxidize elemental mercury in lignite combustion gases, followed by capture in a wet scrubber. This approach will be applicable to virtually every lignite utility in the United States and Canada and potentially impact subbituminous utilities. The oxidation process is proven at the pilot-scale and in short-term full-scale tests. Additional optimization is continuing on oxidation technologies, and this project focuses on longer-term full-scale testing. The lignite industry has been proactive in advancing the understanding of and identifying control options for Hg in lignite combustion flue gases. Approximately 1 year ago, the EERC and EPRI began a series of Hg-related discussions with the Mercury Task Force as well as utilities firing Texas and Saskatchewan lignites. This project is one of three being undertaken by the consortium to perform large-scale Hg control technology testing to address the specific needs and challenges to be met in controlling Hg from lignite-fired power plants. This project involves Hg oxidation upstream of a system equipped with an electrostatic precipitator (ESP) followed by wet flue gas desulfurization (FGD). The team involved in conducting the technical aspects of the project includes the EERC, Babcock & Wilcox, URS, and ADA-ES. The host sites include Minnkota Power Cooperative Milton R. Young

  4. Pressure-Fed LOX/LCH4 Reaction Control System for Spacecraft: Transient Modeling and Thermal Vacuum Hotfire Test Results

    Science.gov (United States)

    Atwell, Matthew J.; Hurlbert, Eric A.; Melcher, J. C.; Morehead, Robert L.

    2017-01-01

    An integrated cryogenic liquid oxygen, liquid methane (LOX/LCH4) reaction control system (RCS) was tested at NASA Glenn Research Center's Plum Brook Station in the Spacecraft Propulsion Research Facility (B-2) under vacuum and thermal vacuum conditions. The RCS is a subsystem of the Integrated Cryogenic Propulsion Test Article (ICPTA), a pressure-fed LOX/LCH4 propulsion system composed of a single 2,800 lbf main engine, two 28 lbf RCS engines, and two 7 lbf RCS engines. Propellants are stored in four 48 inch diameter 5083 aluminum tanks that feed both the main engine and RCS engines in parallel. Helium stored cryogenically in a composite overwrapped pressure vessel (COPV) flows through a heat exchanger on the main engine before being used to pressurize the propellant tanks to a design operating pressure of 325 psi. The ICPTA is capable of simultaneous main engine and RCS operation. The RCS engines utilize a coil-on-plug (COP) ignition system designed for operation in a vacuum environment, eliminating corona discharge issues associated with a high voltage lead. There are two RCS pods on the ICPTA, with two engines on each pod. One of these two engines is a heritage flight engine from Project Morpheus. Its sea level nozzle was removed and replaced by an 85:1 nozzle machined using Inconel 718, resulting in a maximum thrust of 28 lbf under altitude conditions. The other engine is a scaled down version of the 28 lbf engine, designed to match the core and overall mixture ratios as well as other injector characteristics. This engine can produce a maximum thrust of 7 lbf with an 85:1 nozzle that was additively manufactured using Inconel 718. Both engines are film-cooled and capable of limited duration gas-gas and gas-liquid operation, as well as steady-state liquid-liquid operation. Each pod contains one of each version, such that two engines of the same thrust level can be fired as a couple on opposite pods. The RCS feed system is composed of symmetrical 3/8 inch lines

  5. System Performance and Testing

    NARCIS (Netherlands)

    Frei, U.; Oversloot, H.

    2004-01-01

    This chapter compares and contrasts the system performance of two widely used solar thermal systems using testing and simulation programs. Solar thermal systems are used in many countries for heating domestically used water. In addition to the simple thermosiphon systems, better designed pumped

  6. Overview of Microbiological Tests Performed During the Design of the International Space Station Environmental Control and Life Support Systems

    Science.gov (United States)

    Roman, Monsi C.; Mittelman, Marc W.

    2010-01-01

    The design and manufacturing of the main Environmental Control and Life Support Systems (ECLSS) for the United States segments of the International Space Station (ISS) was an involved process that started in the late 1980's, with the assessment and testing of competing technologies that could be used to clean the air and recycle water. It culminated in 2009 with the delivery and successful activation of the Water Recovery System (WRS) water processor (WP). The ECLSS required the work of a team of engineers and scientist working together to develop systems that could clean and/or recycle human metabolic loads to maintain a clean atmosphere and provide the crew clean water. One of the main goals of the ECLSS is to minimize the time spent by the crew worrying about vital resources not available in the vacuum of space, which allows them to spend most of their time learning to live in a microgravity environment many miles from the comforts of Earth and working on science experiments. Microorganisms are a significant part of the human body as well as part of the environment that we live in. Therefore, the ISS ECLSS design had to take into account the effect microorganisms have on the quality of stored water and wastewater, as well as that of the air systems. Hardware performance issues impacted by the accumulation of biofilm and/or microbiologically influenced corrosion were also studied during the ECLSS development stages. Many of the tests that were performed had to take into account the unique aspects of a microgravity environment as well as the challenge of understanding how to design systems that could not be sterilized or maintained in a sterile state. This paper will summarize the work of several studies that were performed to assess the impacts and/or to minimize the effects of microorganisms in the design of a closed loop life support system.

  7. A systems approach to college drinking: development of a deterministic model for testing alcohol control policies.

    Science.gov (United States)

    Scribner, Richard; Ackleh, Azmy S; Fitzpatrick, Ben G; Jacquez, Geoffrey; Thibodeaux, Jeremy J; Rommel, Robert; Simonsen, Neal

    2009-09-01

    The misuse and abuse of alcohol among college students remain persistent problems. Using a systems approach to understand the dynamics of student drinking behavior and thus forecasting the impact of campus policy to address the problem represents a novel approach. Toward this end, the successful development of a predictive mathematical model of college drinking would represent a significant advance for prevention efforts. A deterministic, compartmental model of college drinking was developed, incorporating three processes: (1) individual factors, (2) social interactions, and (3) social norms. The model quantifies these processes in terms of the movement of students between drinking compartments characterized by five styles of college drinking: abstainers, light drinkers, moderate drinkers, problem drinkers, and heavy episodic drinkers. Predictions from the model were first compared with actual campus-level data and then used to predict the effects of several simulated interventions to address heavy episodic drinking. First, the model provides a reasonable fit of actual drinking styles of students attending Social Norms Marketing Research Project campuses varying by "wetness" and by drinking styles of matriculating students. Second, the model predicts that a combination of simulated interventions targeting heavy episodic drinkers at a moderately "dry" campus would extinguish heavy episodic drinkers, replacing them with light and moderate drinkers. Instituting the same combination of simulated interventions at a moderately "wet" campus would result in only a moderate reduction in heavy episodic drinkers (i.e., 50% to 35%). A simple, five-state compartmental model adequately predicted the actual drinking patterns of students from a variety of campuses surveyed in the Social Norms Marketing Research Project study. The model predicted the impact on drinking patterns of several simulated interventions to address heavy episodic drinking on various types of campuses.

  8. A Systems Approach to College Drinking: Development of a Deterministic Model for Testing Alcohol Control Policies*

    Science.gov (United States)

    Scribner, Richard; Ackleh, Azmy S.; Fitzpatrick, Ben G.; Jacquez, Geoffrey; Thibodeaux, Jeremy J.; Rommel, Robert; Simonsen, Neal

    2009-01-01

    Objective: The misuse and abuse of alcohol among college students remain persistent problems. Using a systems approach to understand the dynamics of student drinking behavior and thus forecasting the impact of campus policy to address the problem represents a novel approach. Toward this end, the successful development of a predictive mathematical model of college drinking would represent a significant advance for prevention efforts. Method: A deterministic, compartmental model of college drinking was developed, incorporating three processes: (1) individual factors, (2) social interactions, and (3) social norms. The model quantifies these processes in terms of the movement of students between drinking compartments characterized by five styles of college drinking: abstainers, light drinkers, moderate drinkers, problem drinkers, and heavy episodic drinkers. Predictions from the model were first compared with actual campus-level data and then used to predict the effects of several simulated interventions to address heavy episodic drinking. Results: First, the model provides a reasonable fit of actual drinking styles of students attending Social Norms Marketing Research Project campuses varying by “wetness” and by drinking styles of matriculating students. Second, the model predicts that a combination of simulated interventions targeting heavy episodic drinkers at a moderately “dry” campus would extinguish heavy episodic drinkers, replacing them with light and moderate drinkers. Instituting the same combination of simulated interventions at a moderately “wet” campus would result in only a moderate reduction in heavy episodic drinkers (i.e., 50% to 35%). Conclusions: A simple, five-state compartmental model adequately predicted the actual drinking patterns of students from a variety of campuses surveyed in the Social Norms Marketing Research Project study. The model predicted the impact on drinking patterns of several simulated interventions to address heavy

  9. The control system of the 12-m medium-size telescope prototype: a test-ground for the CTA array control

    Science.gov (United States)

    Oya, I.; Anguner, E. A.; Behera, B.; Birsin, E.; Fuessling, M.; Lindemann, R.; Melkumyan, D.; Schlenstedt, S.; Schmidt, T.; Schwanke, U.; Sternberger, R.; Wegner, P.; Wiesand, S.

    2014-07-01

    The Cherenkov Telescope Array (CTA) will be the next generation ground-based very-high energy -ray observatory. CTA will consist of two arrays: one in the Northern hemisphere composed of about 20 telescopes, and the other one in the Southern hemisphere composed of about 100 telescopes, both arrays containing telescopes of different sizes and types and in addition numerous auxiliary devices. In order to provide a test-ground for the CTA array control, the steering software of the 12-m medium size telescope (MST) prototype deployed in Berlin has been implemented using the tools and design concepts under consideration to be used for the control of the CTA array. The prototype control system is implemented based on the Atacama Large Millimeter/submillimeter Array (ALMA) Common Software (ACS) control middleware, with components implemented in Java, C++ and Python. The interfacing to the hardware is standardized via the Object Linking and Embedding for Process Control Unified Architecture (OPC UA). In order to access the OPC UA servers from the ACS framework in a common way, a library has been developed that allows to tie the OPC UA server nodes, methods and events to the equivalents in ACS components. The front-end of the archive system is able to identify the deployed components and to perform the sampling of the monitoring points of each component following time and value change triggers according to the selected configurations. The back-end of the archive system of the prototype is composed by two different databases: MySQL and MongoDB. MySQL has been selected as storage of the system configurations, while MongoDB is used to have an efficient storage of device monitoring data, CCD images, logging and alarm information. In this contribution, the details and conclusions on the implementation of the control software of the MST prototype are presented.

  10. NASA Langley's AirSTAR Testbed: A Subscale Flight Test Capability for Flight Dynamics and Control System Experiments

    Science.gov (United States)

    Jordan, Thomas L.; Bailey, Roger M.

    2008-01-01

    As part of the Airborne Subscale Transport Aircraft Research (AirSTAR) project, NASA Langley Research Center (LaRC) has developed a subscaled flying testbed in order to conduct research experiments in support of the goals of NASA s Aviation Safety Program. This research capability consists of three distinct components. The first of these is the research aircraft, of which there are several in the AirSTAR stable. These aircraft range from a dynamically-scaled, twin turbine vehicle to a propeller driven, off-the-shelf airframe. Each of these airframes carves out its own niche in the research test program. All of the airplanes have sophisticated on-board data acquisition and actuation systems, recording, telemetering, processing, and/or receiving data from research control systems. The second piece of the testbed is the ground facilities, which encompass the hardware and software infrastructure necessary to provide comprehensive support services for conducting flight research using the subscale aircraft, including: subsystem development, integrated testing, remote piloting of the subscale aircraft, telemetry processing, experimental flight control law implementation and evaluation, flight simulation, data recording/archiving, and communications. The ground facilities are comprised of two major components: (1) The Base Research Station (BRS), a LaRC laboratory facility for system development, testing and data analysis, and (2) The Mobile Operations Station (MOS), a self-contained, motorized vehicle serving as a mobile research command/operations center, functionally equivalent to the BRS, capable of deployment to remote sites for supporting flight tests. The third piece of the testbed is the test facility itself. Research flights carried out by the AirSTAR team are conducted at NASA Wallops Flight Facility (WFF) on the Eastern Shore of Virginia. The UAV Island runway is a 50 x 1500 paved runway that lies within restricted airspace at Wallops Flight Facility. The

  11. Thermal room modelling adapted to the test of HVAC control systems; Modele de zone adapte aux essais de regulateurs de systemes de chauffage et de climatisation

    Energy Technology Data Exchange (ETDEWEB)

    Riederer, P.

    2002-01-15

    Room models, currently used for controller tests, assume the room air to be perfectly mixed. A new room model is developed, assuming non-homogeneous room conditions and distinguishing between different sensor positions. From measurement in real test rooms and detailed CFD simulations, a list of convective phenomena is obtained that has to be considered in the development of a model for a room equipped with different HVAC systems. The zonal modelling approach that divides the room air into several sub-volumes is chosen, since it is able to represent the important convective phenomena imposed on the HVAC system. The convective room model is divided into two parts: a zonal model, representing the air at the occupant zone and a second model, providing the conditions at typical sensor positions. Using this approach, the comfort conditions at the occupant zone can be evaluated as well as the impact of different sensor positions. The model is validated for a test room equipped with different HVAC systems. Sensitivity analysis is carried out on the main parameters of the model. Performance assessment and energy consumption are then compared for different sensor positions in a room equipped with different HVAC systems. The results are also compared with those obtained when a well-mixed model is used. A main conclusion of these tests is, that the differences obtained, when changing the position of the controller's sensor, is a function of the HVAC system and controller type. The differences are generally small in terms of thermal comfort but significant in terms of overall energy consumption. For different HVAC systems the cases are listed, in which the use of a simplified model is not recommended. (author)

  12. Tests of the data acquisition system and detector control system for the muon chambers of the CMS experiment at the LHC

    CERN Document Server

    Sowa, Michael Christian

    The Phys. Inst. III A of RWTH Aachen University is involved in the development, production and tests of the Drift Tube (DT) muon chambers for the barrel muon system of the CMS detector at the LHC at CERN (Geneva). The thesis describes some test procedures which were developed and performed for the chamber local Data Acquisition (DAQ) system, as well as for parts of the Detector Control System (DCS). The test results were analyzed and discussed. Two main kinds of DAQ tests were done. On the one hand, to compare two different DAQ systems, the chamber signals were split and read out by both systems. This method allowed to validate them by demonstrating, that there were no relevant differences in the measured drift times, generated by the same muon event in the same chamber cells. On the other hand, after the systems were validated, the quality of the data was checked. For this purpose extensive noise studies were performed. The noise dependence on various parameters (threshold, HV) was investigated quantitativel...

  13. Portable Health Algorithms Test System

    Science.gov (United States)

    Melcher, Kevin J.; Wong, Edmond; Fulton, Christopher E.; Sowers, Thomas S.; Maul, William A.

    2010-01-01

    A document discusses the Portable Health Algorithms Test (PHALT) System, which has been designed as a means for evolving the maturity and credibility of algorithms developed to assess the health of aerospace systems. Comprising an integrated hardware-software environment, the PHALT system allows systems health management algorithms to be developed in a graphical programming environment, to be tested and refined using system simulation or test data playback, and to be evaluated in a real-time hardware-in-the-loop mode with a live test article. The integrated hardware and software development environment provides a seamless transition from algorithm development to real-time implementation. The portability of the hardware makes it quick and easy to transport between test facilities. This hard ware/software architecture is flexible enough to support a variety of diagnostic applications and test hardware, and the GUI-based rapid prototyping capability is sufficient to support development execution, and testing of custom diagnostic algorithms. The PHALT operating system supports execution of diagnostic algorithms under real-time constraints. PHALT can perform real-time capture and playback of test rig data with the ability to augment/ modify the data stream (e.g. inject simulated faults). It performs algorithm testing using a variety of data input sources, including real-time data acquisition, test data playback, and system simulations, and also provides system feedback to evaluate closed-loop diagnostic response and mitigation control.

  14. Tests of the data acquisition system and detector control system for the muon chambers of the CMS experiment at the LHC

    International Nuclear Information System (INIS)

    Sowa, Michael Christian

    2009-01-01

    The Phys. Inst. III A of RWTH Aachen University is involved in the development, production and tests of the Drift Tube (DT) muon chambers for the barrel muon system of the CMS detector at the LHC at CERN (Geneva). The present thesis describes some test procedures which were developed and performed for the chamber local Data Acquisition (DAQ) system, as well as for parts of the Detector Control System (DCS). The test results were analyzed and discussed. Two main kinds of DAQ tests were done. On the one hand, to compare two different DAQ systems, the chamber signals were split and read out by both systems. This method allowed to validate them by demonstrating, that there were no relevant differences in the measured drift times, generated by the same muon event in the same chamber cells. On the other hand, after the systems were validated, the quality of the data was checked. For this purpose extensive noise studies were performed. The noise dependence on various parameters (threshold,HV) was investigated quantitatively. Also detailed studies on single cells, qualified as ''dead'' and ''noisy'' were done. For the DAQ tests a flexible hardware and software environment was needed. The organization and installation of the supplied electronics, as well as the software development was realized within the scope of this thesis. The DCS tests were focused on the local gas pressure read-out components, attached directly to the chamber: pressure sensor, manifolds and the pressure ADC (PADC). At first it was crucial to proof, that the calibration of the mentioned chamber components for the gas pressure measurement is valid. The sensor calibration data were checked and possible differences in their response to the same pressure were studied. The analysis of the results indicated that the sensor output depends also on the ambient temperature, a new experience which implied an additional pedestal measurement of the chamber gas pressure sensors at CMS. The second test sequence

  15. Testing usability and trainability of indirect touch interaction: perspective for the next generation of air traffic control systems.

    Science.gov (United States)

    Causse, Mickaël; Alonso, Roland; Vachon, François; Parise, Robert; Orliaguet, Jean-Pierre; Tremblay, Sébastien; Terrier, Patrice

    2014-01-01

    This study aims to determine whether indirect touch device can be used to interact with graphical objects displayed on another screen in an air traffic control (ATC) context. The introduction of such a device likely requires an adaptation of the sensory-motor system. The operator has to simultaneously perform movements on the horizontal plane while assessing them on the vertical plane. Thirty-six right-handed participants performed movement training with either constant or variable practice and with or without visual feedback of the displacement of their actions. Participants then performed a test phase without visual feedback. Performance improved in both practice conditions, but accuracy was higher with visual feedback. During the test phase, movement time was longer for those who had practiced with feedback, suggesting an element of dependency. However, this 'cost' of feedback did not extend to movement accuracy. Finally, participants who had received variable training performed better in the test phase, but accuracy was still unsatisfactory. We conclude that continuous visual feedback on the stylus position is necessary if tablets are to be introduced in ATC.

  16. Field testing of a remote controlled robotic tele-echo system in an ambulance using broadband mobile communication technology.

    Science.gov (United States)

    Takeuchi, Ryohei; Harada, Hiroshi; Masuda, Kohji; Ota, Gen-ichiro; Yokoi, Masaki; Teramura, Nobuyasu; Saito, Tomoyuki

    2008-06-01

    We report the testing of a mobile Robotic Tele-echo system that was placed in an ambulance and successfully transmitted clear real time echo imaging of a patient's abdomen to the destination hospital from where this device was being remotely operated. Two-way communication between the paramedics in this vehicle and a doctor standing by at the hospital was undertaken. The robot was equipped with an ultrasound probe which was remotely controlled by the clinician at the hospital and ultrasound images of the patient were transmitted wirelessly. The quality of the ultrasound images that were transmitted over the public mobile telephone networks and those transmitted over the Multimedia Wireless Access Network (a private networks) were compared. The transmission rate over the public networks and the private networks was approximately 256 Kbps, 3 Mbps respectively. Our results indicate that ultrasound images of far higher definition could be obtained through the private networks.

  17. Proceedings of the Technology Roadmap Workshop on Communication and Control Systems for Distributed Energy Implementation and Testing

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2002-05-01

    More than 50 experts from energy and information technology industries, Federal and State government agencies, universities, and National Laboratories participated in the “Communication and Control Systems for Distributed Energy Implementation and Testing Workshop” in Reston, Virginia, on May 14-15, 2002. This was a unique workshop in that, for the first time, representatives from the information technology sector and those from energy-related industries, Federal and State government agencies, universities, and National Laboratories, gathered to discuss these issues and develop a set of action-oriented implementation strategies. A planning committee of industry, consultant, and government representatives laid the groundwork for the workshop by identifying key participants and developing an appropriate agenda. This document reflects the ideas and priorities discussed by workshop participants.

  18. GLCTA control system

    International Nuclear Information System (INIS)

    Terunuma, N.; Hayano, H.; Higo, T.; Saeki, T.; Suehara, T.; Watanabe, K.

    2004-01-01

    Research and development for the high power X-band RF technologies have been performed on the GLC Test Accelerator, GLCTA, since fall of 2003. The control system of this facility is based on the PC-Linux servers that handle the CAMAC, VME and PLC modules. Automated RF processing and data accumulation of the RF breakdown have been performed. (author)

  19. ELECTROFORCE 3330 TEST SYSTEM

    Data.gov (United States)

    Federal Laboratory Consortium — The Bose Electroforce 3330 is a test system with an axial electromagnetic linear motor, a torsional motor, and an environmental chamber for high and low temperature...

  20. Automatic Test Systems Aquisition

    National Research Council Canada - National Science Library

    1994-01-01

    We are providing this final memorandum report for your information and use. This report discusses the efforts to achieve commonality in standards among the Military Departments as part of the DoD policy for automatic test systems (ATS...

  1. Flight Test of a Propulsion-Based Emergency Control System on the MD-11 Airplane with Emphasis on the Lateral Axis

    Science.gov (United States)

    Burken, John J.; Burcham, Frank W., Jr.; Maine, Trindel A.; Feather, John; Goldthorpe, Steven; Kahler, Jeffrey A.

    1996-01-01

    A large, civilian, multi-engine transport MD-11 airplane control system was recently modified to perform as an emergency backup controller using engine thrust only. The emergency backup system, referred to as the propulsion-controlled aircraft (PCA) system, would be used if a major primary flight control system fails. To allow for longitudinal and lateral-directional control, the PCA system requires at least two engines and is implemented through software modifications. A flight-test program was conducted to evaluate the PCA system high-altitude flying characteristics and to demonstrate its capacity to perform safe landings. The cruise flight conditions, several low approaches and one landing without any aerodynamic flight control surface movement, were demonstrated. This paper presents results that show satisfactory performance of the PCA system in the longitudinal axis. Test results indicate that the lateral-directional axis of the system performed well at high attitude but was sluggish and prone to thermal upsets during landing approaches. Flight-test experiences and test techniques are also discussed with emphasis on the lateral-directional axis because of the difficulties encountered in flight test.

  2. FY 1998 annual report on the demonstration tests for establishing load concentration controlling systems. Survey on safety of commercial systems; Fuka shuchu seigyo system kakuritsu jissho shiken 1998 nendo kenkyu hokokusho. Jjitsuyo system anzensei chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The demonstration tests are being conducted for establishing load concentration controlling systems, which directly or indirectly control load devices in residential power consumers or the like from a power supplier, as one of the DSM measures. This project is aimed at survey on the systems which support general residential consumers or the like to adequately control loads indirectly, and at clarification of technical essentials the system should have when it is actually put in service and the safety rules to be observed, thereby contributing eventual commercialization of the load concentration controlling systems. The field test results indicate that functions of a monitor set in a domestic consumer can be well operated even by inexperienced persons in handling machines, when they have some experiences. Reliability of a monitoring/controlling device, set in a domestic consumer on a trial basis, can be secured effectively by addition of an LC circuit and changing the modulation mode to FSK. The devices developed on a trial basis are found to be well serviceable for the demonstration tests. The best method for communication with the monitoring/controlling device for electric appliances in a domestic consumer is communication via a power transmission line. (NEDO)

  3. Max Launch Abort System (MLAS) Pad Abort Test Vehicle (PATV) II Attitude Control System (ACS) Integration and Pressurization Subsystem Dynamic Random Vibration Analysis

    Science.gov (United States)

    Ekrami, Yasamin; Cook, Joseph S.

    2011-01-01

    In order to mitigate catastrophic failures on future generation space vehicles, engineers at the National Aeronautics and Space Administration have begun to integrate a novel crew abort systems that could pull a crew module away in case of an emergency at the launch pad or during ascent. The Max Launch Abort System (MLAS) is a recent test vehicle that was designed as an alternative to the baseline Orion Launch Abort System (LAS) to demonstrate the performance of a "tower-less" LAS configuration under abort conditions. The MLAS II test vehicle will execute a propulsive coast stabilization maneuver during abort to control the vehicles trajectory and thrust. To accomplish this, the spacecraft will integrate an Attitude Control System (ACS) with eight hypergolic monomethyl hydrazine liquid propulsion engines that are capable of operating in a quick pulsing mode. Two main elements of the ACS include a propellant distribution subsystem and a pressurization subsystem to regulate the flow of pressurized gas to the propellant tanks and the engines. The CAD assembly of the Attitude Control System (ACS) was configured and integrated into the Launch Abort Vehicle (LAV) design. A dynamic random vibration analysis was conducted on the Main Propulsion System (MPS) helium pressurization panels to assess the response of the panel and its components under increased gravitational acceleration loads during flight. The results indicated that the panels fundamental and natural frequencies were farther from the maximum Acceleration Spectral Density (ASD) vibrations which were in the range of 150-300 Hz. These values will direct how the components will be packaged in the vehicle to reduce the effects high gravitational loads.

  4. Automatic system of tests for control equipment in combined cycle power stations; Sistema automatico de pruebas para equipos de control en centrales de ciclo combinado

    Energy Technology Data Exchange (ETDEWEB)

    Martinez M, Miguel A; Flores L, Zenon; Delgadillo V, Miguel A; Gutierrez A, Ruben [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2001-07-01

    This article deals on the Automatic System of Tests, denominated PROBADOR, used by the Gerencia de Control e Instrumentation (GCI) of the Instituto de Investigaciones Electricas (IIE)for the accomplishment of dynamic tests in laboratory, to the systems of acquisition and control developed with the electronic line SAC-IIE that are installed in the Thermoelectric Power station of Combined Cycle (CTCC) of Dos Bocas, Veracruz and Gomez Palacio, Durango, Mexico. Also the architecture, the functions that are carried out in the equipment of the System of Acquisition and control (SAC) and in the personal computer (PC) that conforms it are described, as well as the methodology used for the development of the tests. The PC constitutes Interface Man-Machine (IMM) and in the SAC equipment the simulation of the processes is made (by means of the execution of algebraic-differential equations) in the compressor, combustion chamber, gas turbine, heat recuperators, steam turbines and condenser equipment that integrate a CTCC. The equations that are used are based in the thermodynamics, flow dynamics and heat transfer; they become attached to the real process with a margin of error that is estimated in 10%. Finally, the tendencies of the PROBADOR and the technical and economic advantages are described that it has provided for the improvement in the performance of the control systems, before different situations, with no need to have the real process. [Spanish] Este articulo versa sobre el Sistema Automatico de Pruebas, denominado PROBADOR, utilizado por la Gerencia de Control e Instrumentacion (GCI) del Instituto de Investigaciones Electricas para la realizacion de pruebas dinamicas en laboratorio, a los sistemas de adquisicion y control desarrollado con la linea electronica SAC-IIE que estan instalados en las Centrales Termoelectricas de Ciclo Combinado (CTCC) de Dos Bocas, Veracruz y Gomez Palacio, Durango, Mexico. Tambien se describen la arquitectura, las funciones que se llevan

  5. CMIF ECLS system test findings

    Science.gov (United States)

    Schunk, Richard G.; Carrasquillo, Robyn L.; Ogle, Kathyrn Y.; Wieland, Paul O.; Bagdigian, Robert M.

    1989-01-01

    During 1987 three Space Station integrated Environmental Control and Life Support System (ECLSS) tests were conducted at the Marshall Space Flight Center (MSFC) Core Module Integration Facility (CMIF) as part of the MSFC ECLSS Phase II test program. The three tests ranged in duration from 50 to 150 hours and were conducted inside of the CMIF module simulator. The Phase II partial integrated system test configuration consisted of four regenerative air revitalization subsystems and one regenerative water reclamation subsystem. This paper contains a discussion of results and lessons learned from the Phase II test program. The design of the Phase II test configuration and improvements made throughout the program are detailed. Future plans for the MSFC CMIF test program are provided, including an overview of planned improvements for the Phase III program.

  6. Nuclear system test simulator

    International Nuclear Information System (INIS)

    Sawyer, S.D.; Hill, W.D.; Wilson, P.A.; Steiner, W.M.

    1987-01-01

    A transportable test simulator is described for a nuclear power plant. The nuclear power plant includes a control panel, a reactor having actuated rods for moving into and out of a reactor for causing the plant to operate, and a control rod network extending between the control panel and the reactor rods. The network serially transmits command words between the panel and rods, and has connecting interfaces at preselected points remote from the control panel between the control panel and rods. The test simulator comprises: a test simulator input for transport to and connection into the network at at least one interface for receiving the serial command words from the network. Each serial command includes an identifier portion and a command portion; means for processing interior of the simulator for the serial command words for identifying that portion of the power plant designated in the identifier portion and processing the word responsive to the command portion of the word after the identification; means for generating a response word responsive to the command portion; and output means for sending and transmitting the response word to the nuclear power plant at the interface whereby the control panel responds to the response word

  7. Programmable automated transistor test system

    International Nuclear Information System (INIS)

    Truong, L.V.; Sundberg, G.R.

    1986-01-01

    The paper describes a programmable automated transistor test system (PATTS) and its utilization to evaluate bipolar transistors and Darlingtons, and such MOSFET and special types as can be accommodated with the PATTS base-drive. An application of a pulsed power technique at low duty cycles in a non-destructive test is used to examine the dynamic switching characteristic curves of power transistors. Data collection, manipulation, storage, and output are operator interactive but are guided and controlled by the system software. In addition a library of test data is established on disks, tapes, and hard copies for future reference

  8. Decant pump assembly and controls qualification testing - test report

    Energy Technology Data Exchange (ETDEWEB)

    Staehr, T.W., Westinghouse Hanford

    1996-05-02

    This report summarizes the results of the qualification testing of the supernate decant pump and controls system to be used for in-tank sludge washing in aging waste tank AZ-101. The test was successful and all components are qualified for installation and use in the tank.

  9. Programmable, automated transistor test system

    Science.gov (United States)

    Truong, L. V.; Sundburg, G. R.

    1986-01-01

    A programmable, automated transistor test system was built to supply experimental data on new and advanced power semiconductors. The data will be used for analytical models and by engineers in designing space and aircraft electric power systems. A pulsed power technique was used at low duty cycles in a nondestructive test to examine the dynamic switching characteristic curves of power transistors in the 500 to 1000 V, 10 to 100 A range. Data collection, manipulation, storage, and output are operator interactive but are guided and controlled by the system software.

  10. Intercomparison tests and internal control samples as substantial elements of the quality control system: practical insights; Ringversuche und interne Kontrollproben als Elemente der Qualitaetssicherung: Erfahrungen aus der Praxis

    Energy Technology Data Exchange (ETDEWEB)

    Beyer, D.; Hartmann, M. [Bundesamt fuer Strahlenschutz, Berlin (Germany). Inst. fuer Angewandten Strahlenschutz

    2002-07-01

    The contribution highlights the practical experience accumulated in implementing the statutory ordinance on the monitoring of incorporated ionizing radiation by official monitoring stations, effective in Germany since 1996, focusing on the quality assurance system to be maintained by those stations. The examples used to illustrate practical aspects are: participation in intercomparison tests, sampling for internal control purposes, and the monitoring by way of excretion analyses of individuals handling alpha and beta emitters (nuclides) at their place of work. (orig./CB) [German] Im Jahre 1996 trat in Deutschland die 'Richtlinie ueber Anforderungen an Inkorporationsmessstellen' (Anforderungsrichtlinie) in Kraft. Danach werden fuer die Durchfuehrung der Inkorporationsueberwachung nur noch Messstellen amtlich anekannt, die unter anderem den dort gegebenen Anforderungen an Qualitaetssicherungsmassnahmen genuegen. Im Einzelnen betrifft dies die Teilnahme an Ringversuchen sowie die vorgeschriebenen internen Eigenkontrollen. Am Beispiel der Inkorporationsueberwachung durch Ausscheidungsanalyse, die bevorzugt beim Umgang mit alpha- und betastrahlenden Nukliden durchgefuehrt wird, werden die bisherigen Erfahrungen bei Anwendung der Anforderungsrichtlinie vorgestellt. (orig.)

  11. Automatic control systems engineering

    International Nuclear Information System (INIS)

    Shin, Yun Gi

    2004-01-01

    This book gives descriptions of automatic control for electrical electronics, which indicates history of automatic control, Laplace transform, block diagram and signal flow diagram, electrometer, linearization of system, space of situation, state space analysis of electric system, sensor, hydro controlling system, stability, time response of linear dynamic system, conception of root locus, procedure to draw root locus, frequency response, and design of control system.

  12. Tests of the data acquisition system and detector control system for the muon chambers of the CMS experiment at the LHC

    Energy Technology Data Exchange (ETDEWEB)

    Sowa, Michael Christian

    2009-02-27

    The Phys. Inst. III A of RWTH Aachen University is involved in the development, production and tests of the Drift Tube (DT) muon chambers for the barrel muon system of the CMS detector at the LHC at CERN (Geneva). The present thesis describes some test procedures which were developed and performed for the chamber local Data Acquisition (DAQ) system, as well as for parts of the Detector Control System (DCS). The test results were analyzed and discussed. Two main kinds of DAQ tests were done. On the one hand, to compare two different DAQ systems, the chamber signals were split and read out by both systems. This method allowed to validate them by demonstrating, that there were no relevant differences in the measured drift times, generated by the same muon event in the same chamber cells. On the other hand, after the systems were validated, the quality of the data was checked. For this purpose extensive noise studies were performed. The noise dependence on various parameters (threshold,HV) was investigated quantitatively. Also detailed studies on single cells, qualified as ''dead'' and ''noisy'' were done. For the DAQ tests a flexible hardware and software environment was needed. The organization and installation of the supplied electronics, as well as the software development was realized within the scope of this thesis. The DCS tests were focused on the local gas pressure read-out components, attached directly to the chamber: pressure sensor, manifolds and the pressure ADC (PADC). At first it was crucial to proof, that the calibration of the mentioned chamber components for the gas pressure measurement is valid. The sensor calibration data were checked and possible differences in their response to the same pressure were studied. The analysis of the results indicated that the sensor output depends also on the ambient temperature, a new experience which implied an additional pedestal measurement of the chamber gas pressure

  13. CAMAC system test module

    International Nuclear Information System (INIS)

    Dawson, W.K.; Gjovig, A.; Naivar, F.; Potter, J.; Smith, W.

    1981-01-01

    Since the CAMAC Branch Highway is used to both send information to and receive information from a CAMAC crate, faults in this highway can be difficult to recognize and diagnose. Similarly faults caused by a Crate Controller corrupting either instructions or data are difficult to distinguish from faults caused by the modules themselves. The CLIVIT (CAMAC Logic Integrity Via Interactive Testing) module is designed to largely eliminate such difficulties and ambiguities by allowing the verification of Branch Highway and Dataway transactions via an independent data communication path. The principle of operation of the CLIVIT is explained. Described are the prototype construction, testing and use

  14. Impact of an automated email notification system for results of tests pending at discharge: a cluster-randomized controlled trial.

    Science.gov (United States)

    Dalal, Anuj K; Roy, Christopher L; Poon, Eric G; Williams, Deborah H; Nolido, Nyryan; Yoon, Cathy; Budris, Jonas; Gandhi, Tejal; Bates, David W; Schnipper, Jeffrey L

    2014-01-01

    Physician awareness of the results of tests pending at discharge (TPADs) is poor. We developed an automated system that notifies responsible physicians of TPAD results via secure, network email. We sought to evaluate the impact of this system on self-reported awareness of TPAD results by responsible physicians, a necessary intermediary step to improve management of TPAD results. We conducted a cluster-randomized controlled trial at a major hospital affiliated with an integrated healthcare delivery network in Boston, Massachusetts. Adult patients with TPADs who were discharged from inpatient general medicine and cardiology services were assigned to the intervention or usual care arm if their inpatient attending physician and primary care physician (PCP) were both randomized to the same study arm. Patients of physicians randomized to discordant study arms were excluded. We surveyed these physicians 72 h after all TPAD results were finalized. The primary outcome was awareness of TPAD results by attending physicians. Secondary outcomes included awareness of TPAD results by PCPs, awareness of actionable TPAD results, and provider satisfaction. We analyzed data on 441 patients. We sent 441 surveys to attending physicians and 353 surveys to PCPs and received 275 and 152 responses from 83 different attending physicians and 112 different PCPs, respectively (attending physician survey response rate of 63%). Intervention attending physicians and PCPs were significantly more aware of TPAD results (76% vs 38%, adjusted/clustered OR 6.30 (95% CI 3.02 to 13.16), pemail notification represents a promising strategy for managing TPAD results, potentially mitigating an unresolved patient safety concern. ClinicalTrials.gov (NCT01153451).

  15. Test to prove the resistance to incidents of components of electric and control systems in the safety containment of nuclear power plants

    International Nuclear Information System (INIS)

    1982-01-01

    The marginal program for proving the suitability of safety-relevant components of electric and control systems in the safety containment during a loss-of-coolant incident is described. Variant test conditions are established in the component-specific test program. Special attention has been paid to the representation of the course of pressure and temperature for the performance test of the valve room of the Nuclear Power Plant Philippsburg 2. (DG) [de

  16. Description, field test and data analysis of a controlled-source EM system (EM-60). [Leach Hot Springs, Grass Valley

    Energy Technology Data Exchange (ETDEWEB)

    Morrison, H.F.; Goldstein, N.E.; Hoversten, M.; Oppliger, G.; Riveros, C.

    1978-10-01

    The three sections describe the transmitter, the receiver, and data interpretations and indicate the advances made toward the development of a large moment electromagnetic (EM) system employing a magnetic dipole source. A brief description is given of the EM-60 transmitter, its general design, and the consideration involved in the selection of a practical coil size and weight for routine field operations. A programmable, multichannel, multi-frequency, phase-sensitive receiver is described. A field test of the EM-60, the data analysis and interpretation procedures, and a comparison between the survey results and the results obtained using other electrical techniques are presented. The Leach Hot Springs area in Grass Valley, Pershing County, Nevada, was chosen for the first field site at which the entire system would be tested. The field tests showed the system capable of obtaining well-defined sounding curves (amplitude and phase of magnetic fields) from 1 kHz down to 0.1 Hz. (MHR)

  17. Precision digital control systems

    Science.gov (United States)

    Vyskub, V. G.; Rozov, B. S.; Savelev, V. I.

    This book is concerned with the characteristics of digital control systems of great accuracy. A classification of such systems is considered along with aspects of stabilization, programmable control applications, digital tracking systems and servomechanisms, and precision systems for the control of a scanning laser beam. Other topics explored are related to systems of proportional control, linear devices and methods for increasing precision, approaches for further decreasing the response time in the case of high-speed operation, possibilities for the implementation of a logical control law, and methods for the study of precision digital control systems. A description is presented of precision automatic control systems which make use of electronic computers, taking into account the existing possibilities for an employment of computers in automatic control systems, approaches and studies required for including a computer in such control systems, and an analysis of the structure of automatic control systems with computers. Attention is also given to functional blocks in the considered systems.

  18. BSF control system

    International Nuclear Information System (INIS)

    Irie, Y.; Ishii, K.; Ninomiya, S.; Sasaki, H.; Sakai, I.

    1982-08-01

    The booster synchrotron utilization facility (BSF) is a facility which utilizes the four fifths of available beam pulses from the KEK booster synchrotron. The BSF control system includes the beam line control, interactions with the PS central control room and the experimental facilities, and the access control system. A brief description of the various components in the control system is given. (author)

  19. Vehicle brake testing system

    Science.gov (United States)

    Stevens, Samuel S [Harriman, TN; Hodgson, Jeffrey W [Lenoir City, TN

    2002-11-19

    This invention relates to a force measuring system capable of measuring forces associated with vehicle braking and of evaluating braking performance. The disclosure concerns an invention which comprises a first row of linearly aligned plates, a force bearing surface extending beneath and beside the plates, vertically oriented links and horizontally oriented links connecting each plate to a force bearing surface, a force measuring device in each link, a transducer coupled to each force measuring device, and a computing device coupled to receive an output signal from the transducer indicative of measured force in each force measuring device. The present invention may be used for testing vehicle brake systems.

  20. Control system design method

    Science.gov (United States)

    Wilson, David G [Tijeras, NM; Robinett, III, Rush D.

    2012-02-21

    A control system design method and concomitant control system comprising representing a physical apparatus to be controlled as a Hamiltonian system, determining elements of the Hamiltonian system representation which are power generators, power dissipators, and power storage devices, analyzing stability and performance of the Hamiltonian system based on the results of the determining step and determining necessary and sufficient conditions for stability of the Hamiltonian system, creating a stable control system based on the results of the analyzing step, and employing the resulting control system to control the physical apparatus.

  1. FFTF control system experience

    International Nuclear Information System (INIS)

    Warrick, R.P.

    1981-01-01

    The FFTF control systems provide control equipment for safe and efficient operation of the plant. For convenience, these systems will be divided into three parts for discussions: (1) Plant Protection System (PPS); (2) Plant Control System (PCS); and (3) General Observations. Performance of each of these systems is discussed

  2. Phase 1 Integrated Systems Test and Characterization Report for the 5-Megawatt Dynamometer and Controllable Grid Interface

    Energy Technology Data Exchange (ETDEWEB)

    Wallen, Robert B [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Lambert, Scott R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Gevorgian, Vahan [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Dana, Scott [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-03-13

    This report details the commissioning of the 5-megawatt dynamometer at the National Wind Technology Center at the National Renewable Energy Laboratory. The purpose of these characterization tests were to verify the dynamometer's performance over the widest possible range of operating conditions, gain insight into system-level behavior, and establish confidence in measurement data.

  3. In-Service Performance and Costs of Methods to Control Urban Rail System Noise : Second Test Series Report

    Science.gov (United States)

    1979-10-01

    The goal of the project is to provide sufficient information to allow a transit system with given track and car conditions and budgetary constraints to determine the mix of available noise control methods which will result in the greatest overall ben...

  4. Nightly Test system migration

    CERN Document Server

    Win-Lime, Kevin

    2013-01-01

    The summer student program allows students to participate to the Cern adventure. They can follow several interesting lectures about particle science and participate to the experiment work. As a summer student, I had worked for LHCb experiment. LHCb uses a lot of software to analyze its data. All this software is organized in packages and projects. They are built and tested during the night using an automated system and the results are displayed on a web interface. Actually, LHCb is changing this system. It is looking for a replacement candidate. So I was charged to unify some internal interfaces to permit a swift migration. In this document, I will describe shortly the system used by LHCb, then I will explain what I have done in detail.

  5. Modernization of control system using the digital control system

    International Nuclear Information System (INIS)

    Carrasco, J. A.; Fernandez, L.; Jimenez, A.

    2002-01-01

    Nowadays, all plant automation tendencies are based on the use of Digital Control System. In big industrial plants the control systems employed are Distributed Control Systems (DCS). The addition of these systems in nuclear power plants,implies an important adaptation process, because most of them were installed using analog control systems. This paper presents the objectives and the first results obtained, in a modernization project, focused in obtaining an engineering platform for making test and analysis of changes prior to their implementation in a nuclear plant. Modernization, Upgrade, DCS, Automation, Simulation, Training. (Author)

  6. FLEXURAL TESTING MACHINE AS AN OFF-LINE CONTROL SYSTEM FOR QUALITY MONITORING IN THE PRODUCTION OF BENDED CERAMIC TILES

    Directory of Open Access Journals (Sweden)

    Cristiano Fragassa

    2016-06-01

    Full Text Available The capability to bend in a controlled manner Gres Porcelain stoneware tiles passing by a very exclusive process of pyroplastic deformation opens up entirely new opportunities in utilisation of this important family of ceramics. A bended tile can be exploited in innovative applications, such as stairs, shelves, benches and even radiators, turning this element from a simple piece of furnishing in a modern functional component. But this change in functionality also requires a different approach in the quality control, both at the product and process levels, that can no longer be limited to the use of tests specified in the regulations for traditional ceramics (e.g. colour, porosity, hygroscopic .... This article describes the first device so far devised for the verification of resistance to bending of curved tiles, discussing the correct way of use. The adoption of this particular equipment as an off-line control device can represent a valid strategy for monitoring the product and process quality.

  7. Hybrid spacecraft attitude control system

    Directory of Open Access Journals (Sweden)

    Renuganth Varatharajoo

    2016-02-01

    Full Text Available The hybrid subsystem design could be an attractive approach for futurespacecraft to cope with their demands. The idea of combining theconventional Attitude Control System and the Electrical Power System ispresented in this article. The Combined Energy and Attitude ControlSystem (CEACS consisting of a double counter rotating flywheel assemblyis investigated for small satellites in this article. Another hybrid systemincorporating the conventional Attitude Control System into the ThermalControl System forming the Combined Attitude and Thermal ControlSystem (CATCS consisting of a "fluid wheel" and permanent magnets isalso investigated for small satellites herein. The governing equationsdescribing both these novel hybrid subsystems are presented and theironboard architectures are numerically tested. Both the investigated novelhybrid spacecraft subsystems comply with the reference missionrequirements.The hybrid subsystem design could be an attractive approach for futurespacecraft to cope with their demands. The idea of combining theconventional Attitude Control System and the Electrical Power System ispresented in this article. The Combined Energy and Attitude ControlSystem (CEACS consisting of a double counter rotating flywheel assemblyis investigated for small satellites in this article. Another hybrid systemincorporating the conventional Attitude Control System into the ThermalControl System forming the Combined Attitude and Thermal ControlSystem (CATCS consisting of a "fluid wheel" and permanent magnets isalso investigated for small satellites herein. The governing equationsdescribing both these novel hybrid subsystems are presented and theironboard architectures are numerically tested. Both the investigated novelhybrid spacecraft subsystems comply with the reference missionrequirements.

  8. Wisdom Appliance Control System

    Science.gov (United States)

    Hendrick; Jheng, Jyun-Teng; Tsai, Chen-Chai; Liou, Jia-Wei; Wang, Zhi-Hao; Jong, Gwo-Jia

    2017-07-01

    Intelligent appliances wisdom involves security, home care, convenient and energy saving, but the home automation system is still one of the core unit, and also using micro-processing electronics technology to centralized and control the home electrical products and systems, such as: lighting, television, fan, air conditioning, stereo, it composed of front-controller systems and back-controller panels, user using front-controller to control command, and then through the back-controller to powered the device.

  9. Computer controlled testing of batteries

    NARCIS (Netherlands)

    Kuiper, A.C.J.; Einerhand, R.E.F.; Visscher, W.

    1989-01-01

    A computerized testing device for batteries consists of a power supply, a multiplexer circuit connected to the batteries, a protection circuit, and an IBM Data Aquisition and Control Adapter card, connected to a personal computer. The software is written in Turbo-Pascal and can be easily adapted to

  10. Personal exposure control system

    International Nuclear Information System (INIS)

    Tanabe, Ken-ichi; Akashi, Michio

    1994-01-01

    Nuclear power stations are under strict radiation control. Exposure control for nuclear workers is the most important operation, and so carefully thought out measures are taken. This paper introduces Fuji Electric's personal exposure control system that meets strict exposure control and rationalizes control operations. The system has a merit that it can provide required information in an optimum form using the interconnection of a super minicomputer and exposure control facilities and realizes sophisticated exposure control operations. (author)

  11. Simulation-based Testing of Control Software

    Energy Technology Data Exchange (ETDEWEB)

    Ozmen, Ozgur [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Nutaro, James J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sanyal, Jibonananda [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Olama, Mohammed M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-02-10

    It is impossible to adequately test complex software by examining its operation in a physical prototype of the system monitored. Adequate test coverage can require millions of test cases, and the cost of equipment prototypes combined with the real-time constraints of testing with them makes it infeasible to sample more than a small number of these tests. Model based testing seeks to avoid this problem by allowing for large numbers of relatively inexpensive virtual prototypes that operate in simulation time at a speed limited only by the available computing resources. In this report, we describe how a computer system emulator can be used as part of a model based testing environment; specifically, we show that a complete software stack including operating system and application software - can be deployed within a simulated environment, and that these simulations can proceed as fast as possible. To illustrate this approach to model based testing, we describe how it is being used to test several building control systems that act to coordinate air conditioning loads for the purpose of reducing peak demand. These tests involve the use of ADEVS (A Discrete Event System Simulator) and QEMU (Quick Emulator) to host the operational software within the simulation, and a building model developed with the MODELICA programming language using Buildings Library and packaged as an FMU (Functional Mock-up Unit) that serves as the virtual test environment.

  12. Proposed minimum requirements for the operational characteristics and testing of closed circuit life support system control electronics.

    Science.gov (United States)

    Kirk, J C

    1998-01-01

    The popularization and transformation of scuba diving into a broadly practiced sport has served to ignite the interest of technically oriented divers into ever more demanding areas. This, along with the gradual release of military data, equipment, and techniques of closed circuit underwater breathing apparatus, has resulted in a virtual explosion of semiclosed and closed circuit systems for divers. Although many of these systems have been carefully thought out by capable designers, the impulse to rush to market with equipment that has not been fully developed and carefully tested is irresistible to marketers. In addition, the presence of systems developed by well-intentioned and otherwise competent designers who are, nonetheless, inexperienced in the field of life support can result in the sale of failure-prone equipment to divers who lack the knowledge and skills to identify deficiencies before disaster occurs. For this reason, a set of industry standards establishing minimum requirements and testing is needed to guide the designers of this equipment, and to protect the user community from incomplete or inadequate design. Many different technologies go into the development of closed circuit scuba. One key area is the design of electronics to monitor and maintain the critical gas mixtures of the closed circuit loop. Much of the system reliability and inherent danger is resident in the design of the circuitry and the software (if any) that runs it. This article will present a set of proposed minimum requirements, with the goal of establishing a dialog for the creation of guidelines for the classification, rating, design, and testing of embedded electronics for life support systems used in closed circuit applications. These guidelines will serve as the foundation for the later creation of a set of industry specifications.

  13. Preoperational test report, primary ventilation system

    International Nuclear Information System (INIS)

    Clifton, F.T.

    1997-01-01

    This represents a preoperational test report for Primary Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides vapor space filtered venting of tanks AY101, AY102, AZ101, AZ102. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System

  14. Preoperational test report, primary ventilation system

    Energy Technology Data Exchange (ETDEWEB)

    Clifton, F.T.

    1997-11-04

    This represents a preoperational test report for Primary Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides vapor space filtered venting of tanks AY101, AY102, AZ101, AZ102. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

  15. Preoperational test report, vent building ventilation system

    International Nuclear Information System (INIS)

    Clifton, F.T.

    1997-01-01

    This represents a preoperational test report for Vent Building Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides Heating, Ventilation, and Air Conditioning (HVAC) for the W-030 Ventilation Building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System

  16. SPECTR System Operational Test Report

    International Nuclear Information System (INIS)

    Landman, W.H. Jr.

    2011-01-01

    This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

  17. Flight test trajectory control analysis

    Science.gov (United States)

    Walker, R.; Gupta, N.

    1983-01-01

    Recent extensions to optimal control theory applied to meaningful linear models with sufficiently flexible software tools provide powerful techniques for designing flight test trajectory controllers (FTTCs). This report describes the principal steps for systematic development of flight trajectory controllers, which can be summarized as planning, modeling, designing, and validating a trajectory controller. The techniques have been kept as general as possible and should apply to a wide range of problems where quantities must be computed and displayed to a pilot to improve pilot effectiveness and to reduce workload and fatigue. To illustrate the approach, a detailed trajectory guidance law is developed and demonstrated for the F-15 aircraft flying the zoom-and-pushover maneuver.

  18. The remote control system

    International Nuclear Information System (INIS)

    Jansweijer, P.P.M.

    1988-01-01

    The remote-control system is applied in order to control various signals in the car of the spectrometer at distance. The construction (hardware and software) as well as the operation of the system is described. (author). 20 figs

  19. Control of optical systems

    Science.gov (United States)

    Founds, D.

    1988-01-01

    Some of the current and planned activities at the Air Force Systems Command in structures and controls for optical-type systems are summarized. Many of the activities are contracted to industry; one task is an in-house program which includes a hardware test program. The objective of the in-house program, referred to as the Aluminum Beam Expander Structure (ABES), is to address issues involved in on-orbit system identification. The structure, which appears similar to the LDR backup structure, is about 35 feet tall. The activity to date has been limited to acquisition of about 250 hours of test data. About 30 hours of data per excitation force is gathered in order to obtain sufficient data for a good statistical estimate of the structural parameters. The development of an Integrated Structural Modeling (ISM) computer program is being done by Boeing Aerospace Company. The objective of the contracted effort is to develop a combined optics, structures, thermal, controls, and multibody dynamics simulation code.

  20. Control and automation systems

    International Nuclear Information System (INIS)

    Schmidt, R.; Zillich, H.

    1986-01-01

    A survey is given of the development of control and automation systems for energy uses. General remarks about control and automation schemes are followed by a description of modern process control systems along with process control processes as such. After discussing the particular process control requirements of nuclear power plants the paper deals with the reliability and availability of process control systems and refers to computerized simulation processes. The subsequent paragraphs are dedicated to descriptions of the operating floor, ergonomic conditions, existing systems, flue gas desulfurization systems, the electromagnetic influences on digital circuits as well as of light wave uses. (HAG) [de

  1. ISABELLE control system

    International Nuclear Information System (INIS)

    Humphrey, J.W.; Frankel, R.S.; Niederer, J.A.

    1980-01-01

    Design principles for the Brookhaven ISABELLE control intersecting storage ring accelerator are described. Principal features include a locally networked console and control computer complex, a system wide process data highway, and intelligent local device controllers. Progress to date is summarized

  2. Fermilab tevatron five refrigerator system tests

    International Nuclear Information System (INIS)

    Rode, C.; Ferry, R.; Leiniger, M.; Makara, J.; Misek, J.; Mizicko, D.; Richied, D.; Theilacker, J.

    1982-01-01

    The Fermilab Tevatron refrigeration system is described with the layout illustrated. The compressor control loops, the refrigerator control loops, and magnet control loops (two per refrigerator) are described and each illustrated. The mobile purifier is described. A five refrigerator test is presented, using two compressor buildings, satellite refrigerator concept test and the test current to the writing. The configuration of the five refrigerator test is diagramed

  3. Reactor control system. PWR

    International Nuclear Information System (INIS)

    2009-01-01

    At present, 23 units of PWR type reactors have been operated in Japan since the start of Mihama Unit 1 operation in 1970 and various improvements have been made to upgrade operability of power stations as well as reliability and safety of power plants. As the share of nuclear power increases, further improvements of operating performance such as load following capability will be requested for power stations with more reliable and safer operation. This article outlined the reactor control system of PWR type reactors and described the control performance of power plants realized with those systems. The PWR control system is characterized that the turbine power is automatic or manually controlled with request of the electric power system and then the nuclear power is followingly controlled with the change of core reactivity. The system mainly consists of reactor automatic control system (control rod control system), pressurizer pressure control system, pressurizer water level control system, steam generator water level control system and turbine bypass control system. (T. Tanaka)

  4. Energy Systems Test Area (ESTA). Power Systems Test Facilities

    Science.gov (United States)

    Situ, Cindy H.

    2010-01-01

    This viewgraph presentation provides a detailed description of the Johnson Space Center's Power Systems Facility located in the Energy Systems Test Area (ESTA). Facilities and the resources used to support power and battery systems testing are also shown. The contents include: 1) Power Testing; 2) Power Test Equipment Capabilities Summary; 3) Source/Load; 4) Battery Facilities; 5) Battery Test Equipment Capabilities Summary; 6) Battery Testing; 7) Performance Test Equipment; 8) Battery Test Environments; 9) Battery Abuse Chambers; 10) Battery Abuse Capabilities; and 11) Battery Test Area Resources.

  5. Use of a portable system with ultrasound and blood tests to improve prenatal controls in rural Guatemala.

    Science.gov (United States)

    Crispín Milart, Patricia Hanna; Diaz Molina, César Augusto; Prieto-Egido, Ignacio; Martínez-Fernández, Andrés

    2016-09-13

    Maternal and neonatal mortality figures remain unacceptably high worldwide and new approaches are required to address this problem. This paper evaluates the impact on maternal and neonatal mortality of a pregnancy care package for rural areas of developing countries with portable ultrasound and blood/urine tests. An observational study was conducted, with intervention and control groups not randomly assigned. Rural areas of the districts of Senahu, Campur and Carcha, in Alta Verapaz Department (Guatemala). The control group is composed by 747 pregnant women attended by the community facilitator, which is the common practice in rural Guatemala. The intervention group is composed by 762 pregnant women attended under the innovative Healthy Pregnancy project. That project strengthens the local prenatal care program, providing local nurses training, portable ultrasound equipment and blood and urine tests. The information of each pregnancy is registered in a medical exchange tool, and is later reviewed by a gynecology specialist to ensure a correct diagnosis and improve nurses training. No maternal deaths were reported within the intervention group, versus five cases in the control group. Regarding neonatal deaths, official data revealed a 64 % reduction for neonatal mortality. A 37 % prevalence of anemia was detected. Non-urgent referral was recommended to 70 pregnancies, being fetal malpresentation the main reported cause. Impact data on maternal mortality (reduction to zero) and neonatal mortality (NMR was reduced to 36 %) are encouraging, although we are aware of the limitations of the study related to possible biasing and the small sample size. The major reduction of maternal and neonatal mortality provides promising prospects for these low-cost diagnostic procedures, which allow to provide high quality prenatal care in isolated rural communities of developing countries. This research was not registered because it is an observational study where the assignment of

  6. Some observations about quality control tests of Spect

    International Nuclear Information System (INIS)

    Robilotta, C.C.; Rebelo, M.F.S.; Oliveira, M.A.

    1987-01-01

    Some observations about quality control tests done in the tomographic system of Heart Institute are described. Among the tests, the traditional test of quality control with scintillation camera and the specific test for tomography systems are induced. The traditional tests are essential, but not sufficient for evaluating the Spect equipment and the specific tests have been effectuated in controlled conditions. (C.G.C.) [pt

  7. Data Link Test and Analysis System/ATCRBS Transponder Test System Technical Reference

    Science.gov (United States)

    1990-05-01

    This document references material for personnel using or making software changes : to the Data Link Test and Analysis System (DATAS) for Air Traffic Control Radar : Beacon System (ATCRBS) transponder testing and data collection. This is one of : a se...

  8. Modular and reconfigurable common PCB-platform of FPGA based LLRF control system for TESLA test facility

    Energy Technology Data Exchange (ETDEWEB)

    Pozniak, K.T.; Romaniuk, R.S. [Institute of Electronic Systems, Warsaw (Poland); Kierzkowski, K. [Institute of Experimental Physics, Warsaw (Poland)

    2005-07-01

    The paper includes a description of predicted functionalities to be implemented in a universal motherboard (MB) for the next generation of LLRF control system for TESLA. The motherboard bases on a number of quasi-autonomous embedded executive modules. The modules are implemented in a few FPGA chips featured by the MB. The paper presents a practical design of the MB. The initial (basic) solution of the MB has the Cyclone as the chip where the board management is embedded. The board features communication modules - VME and micro, single chip PC with Ethernet. The board provides power supply for the FPGA chips. The board has fast internal communication between particular modules. (orig.)

  9. Modular and reconfigurable common PCB-platform of FPGA based LLRF control system for TESLA test facility

    International Nuclear Information System (INIS)

    Pozniak, K.T.; Romaniuk, R.S.; Kierzkowski, K.

    2005-01-01

    The paper includes a description of predicted functionalities to be implemented in a universal motherboard (MB) for the next generation of LLRF control system for TESLA. The motherboard bases on a number of quasi-autonomous embedded executive modules. The modules are implemented in a few FPGA chips featured by the MB. The paper presents a practical design of the MB. The initial (basic) solution of the MB has the Cyclone as the chip where the board management is embedded. The board features communication modules - VME and micro, single chip PC with Ethernet. The board provides power supply for the FPGA chips. The board has fast internal communication between particular modules. (orig.)

  10. Traction Control System for Motorcycles

    Directory of Open Access Journals (Sweden)

    Cardinale Pascal

    2009-01-01

    Full Text Available Traction control is a widely used control system to increase stability and safety of four wheel vehicles. Automatic stability control is used in the BMW K1200R motorcycle and in motoGP competition, but not in other motorcycles. This paper presents an algorithm and a low-cost real-time hardware implementation for motorcycles. A prototype has been developed, applied on a commercial motorcycle, and tested in a real track. The control system that can be tuned by the driver during the race has been appreciated by the test driver.

  11. Integrated control systems

    International Nuclear Information System (INIS)

    Smith, D.J.

    1991-01-01

    This paper reports that instrument manufacturers must develop standard network interfaces to pull together interrelated systems such as automatic start-up, optimization programs, and online diagnostic systems. In the past individual control system manufacturers have developed their own data highways with proprietary hardware and software designs. In the future, electric utilities will require that future systems, irrespective of manufacturer, should be able to communicate with each other. Until now the manufactures of control systems have not agreed on the standard high-speed data highway system. Currently, the Electric Power Research Institute (EPRI), in conjunction with several electric utilities and equipment manufactures, is working on developing a standard protocol for communicating between various manufacturers' control systems. According to N. Michael of Sargent and Lundy, future control room designs will require that more of the control and display functions be accessible from the control room through CRTs. There will be less emphasis on traditional hard-wired control panels

  12. A controllability test for general first-order representations

    NARCIS (Netherlands)

    U. Helmke; J. Rosenthal; J.M. Schumacher (Hans)

    1995-01-01

    textabstractIn this paper we derive a new controllability rank test for general first-order representations. The criterion generalizes the well-known controllability rank test for linear input-state systems as well as a controllability rank test by Mertzios et al. for descriptor systems.

  13. Implementation and flight-test of a multi-mode rotorcraft flight-control system for single-pilot use in poor visibility

    Science.gov (United States)

    Hindson, William S.

    1987-01-01

    A flight investigation was conducted to evaluate a multi-mode flight control system designed according to the most recent recommendations for handling qualities criteria for new military helicopters. The modes and capabilities that were included in the system are those considered necessary to permit divided-attention (single-pilot) lowspeed and hover operations near the ground in poor visibility conditions. Design features included mode-selection and mode-blending logic, the use of an automatic position-hold mode that employed precision measurements of aircraft position, and a hover display which permitted manually-controlled hover flight tasks in simulated instrument conditions. Pilot evaluations of the system were conducted using a multi-segment evaluation task. Pilot comments concerning the use of the system are provided, and flight-test data are presented to show system performance.

  14. A national control system

    International Nuclear Information System (INIS)

    Larsson, A.

    1975-01-01

    An effective control of nuclear fissionable material is dependent on three different kinds of control, the industry - laboratory management, a national control system and an international safeguards system. The national systems of control differ greatly between various industrialized countries. Two principal reasons for fact can be mentioned. The type and the amounts for nuclear material may be different depending upon the stage of development of the nuclear industry in the country in question. Another reason may be that the country may wish to establish a very elaborate national system of control in order to minimize the IAEA control as much as possible. The two safeguards agreements between the Agency and Sweden on one hand and the Agency and Japan on the other hand can serve as examples for the understanding of the latitude of the IAEA safeguards system under NPT due to the influence of the national control system. If it thus is apparent that the national control system is strongly interrelated to the international safeguards system it is equally influenced by the control and accountancy systems which exist at the nuclear plants and development laboratories. A detailed study of national control systems and their relations to plant management control would fall outside the scope of this article. Some important features will however be examined. (author)

  15. Ship Systems Survivability Test Site

    Data.gov (United States)

    Federal Laboratory Consortium — Area for testing survivability of shipboard systems to include electrical, communications, and fire suppression. Multipurpose test range for supporting gun firing,...

  16. Digital control system of advanced reactor

    International Nuclear Information System (INIS)

    Peng Huaqing; Zhang Rui; Liu Lixin

    2001-01-01

    This article produced the Digital Control System For Advanced Reactor made by NPIC. This system uses Siemens SIMATIC PCS 7 process control system and includes five control system: reactor power control system, pressurizer level control system, pressurizer pressure control system, steam generator water level control system and dump control system. This system uses three automatic station to realize the function of five control system. Because the safety requisition of reactor is very strict, the system is redundant. The system configuration uses CFC and SCL. the human-machine interface is configured by Wincc. Finally the system passed the test of simulation by using RETRAN 02 to simulate the control object. The research solved the key technology of digital control system of reactor and will be very helpful for the nationalization of digital reactor control system

  17. RF control system of the HIMAC synchrotron

    International Nuclear Information System (INIS)

    Kanazawa, M.; Sato, K.; Itano, A.

    1992-01-01

    An RF control system of the HIMAC synchrotron has been constructed. In this control system we have adopted a digital feed back system with a digital synthesizer (DS). Combining a high power system, performance of the control system have been tested in a factory (Toshiba) with a simulator circuit of the synchrotron oscillation. Following this test, We had beam acceleration test with this control system at TARN-II in INS (Institute for Nuclear Study, University of Tokyo). This paper describes the RF control system and its tested results. (author)

  18. Intelligent control systems 1990

    International Nuclear Information System (INIS)

    Shoureshi, R.

    1991-01-01

    The field of artificial intelligence (Al) has generated many useful ideas and techniques that can be integrated into the design of control systems. It is believed and, for special cases, has been demonstrated, that integration of Al into control systems would provide the necessary tools for solving many of the complex problems that present control techniques and Al algorithms are unable to do, individually. However, this integration requires the development of basic understanding and new fundamentals to provide scientific bases for achievement of its potential. This book presents an overview of some of the latest research studies in the area of intelligent control systems. These papers present techniques for formulation of intelligent control, and development of the rule-based control systems. Papers present applications of control systems in nuclear power plants and HVAC systems

  19. 21 CFR 58.107 - Test and control article handling.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Test and control article handling. 58.107 Section... GOOD LABORATORY PRACTICE FOR NONCLINICAL LABORATORY STUDIES Test and Control Articles § 58.107 Test and control article handling. Procedures shall be established for a system for the handling of the test and...

  20. ALFA Detector Control System

    CERN Document Server

    Oleiro Seabra, Luis Filipe; The ATLAS collaboration

    2015-01-01

    ALFA (Absolute Luminosity For ATLAS) is one of the sub-detectors of ATLAS (A Toroidal LHC Apparatus). The ALFA system is composed by four stations installed in the LHC tunnel 240 m away from the ATLAS interaction point. Each station has a vacuum and ventilation system, movement control and all the required electronics for signal processing. The Detector Control System (DCS) provides control and monitoring of several components and ensures the safe operation of the detector contributing to good Data Quality. This paper describes the ALFA DCS system including a detector overview, operation aspects and hardware control through a SCADA system, WinCC OA.

  1. ALFA Detector Control System

    CERN Document Server

    Oleiro Seabra, Luis Filipe; The ATLAS collaboration

    2015-01-01

    ALFA (Absolute Luminosity For ATLAS) is one of the sub-detectors of ATLAS/LHC. The ALFA system is composed by two stations installed in the LHC tunnel 240 m away from each side of the ATLAS interaction point. Each station has a vacuum and ventilation system, movement control and all the required electronic for signal processing. The Detector Control System (DCS) provides control and monitoring of several components and ensures the safe operation of the detector contributing to good Data Quality. This paper describes the ALFA DCS system including a detector overview, operation aspects and hardware control through a SCADA system, WinCC OA.

  2. Preliminary test of remote manual instrumentation & control type system for vacuum unit of 350 KeV / 10 mA electron beam machine

    International Nuclear Information System (INIS)

    Sudiyanto

    2003-01-01

    Remote manual instrumentation & control type for vacuum unit of 350 KeV/10 mA Electron Beam Machine is being completed. The system consisting of a remote manual controlled and a remote acquisition system. A remote manual (50 m) controlled is based on the on/off status of 220 Volt terminal supply for pneumatic valves and vacuum pumps, in this case the power supply switch of pneumatic valves and pumps have already been selected On. Remote acquisition of vacuum level can be done by using a CCTV camera which is place in front of the panning gauge and TGP.300 Balzer unit.The CCTV system equipped with 6 cameras, one TV monitor and a multiplexer unit to arranged a selected picture on it. One of the camera was mounted on the rotator unit, it can be controlled (rotating left / right) for different monitoring orientations required by using infrared controller. A trial test of the remote manual control system for vacuum unit of the Electron Beam Machine showed a good performance. (author)

  3. A modular control system

    International Nuclear Information System (INIS)

    Cruz, B.; Drexler, J.; Olcese, G.; Santome, D.

    1990-01-01

    The main objective of the modular control system is to provide the requirements to most of the processes supervision and control applications within the industrial automatization area. The design is based on distribution, modulation and expansion concepts. (Author) [es

  4. The ILC control system

    International Nuclear Information System (INIS)

    Carwardine, J.; Saunders, C.; Arnold, N.; Lenkszus, F.; Rehlich, K.; Simrock, S.; Banerjee, b.; Chase, B.; Gottschalk, E.; Joireman, P.; Kasley, P.; Lackey, S.; McBride, P.; Pavlicek, V.; Patrick, J.; Votava, M.; Wolbers, S.; Furukawa, K.; Michizono, S.; Larson, R.S.; Downing, R.

    2007-01-01

    Since the last ICALEPCS, a small multi-region team has developed a reference design model for a control system for the International Linear Collider as part of the ILC Global Design Effort. The scale and performance parameters of the ILC accelerator require new thinking in regards to control system design. Technical challenges include the large number of accelerator systems to be controlled, the large scale of the accelerator facility, the high degree of automation needed during accelerator operations, and control system equipment requiring 'Five Nines' availability. The R and D path for high availability touches the control system hardware, software, and overall architecture, and extends beyond traditional interfaces into the technical systems. Software considerations for HA include fault detection through exhaustive out-of-band monitoring and automatic state migration to redundant systems, while the telecom industry's emerging ATCA standard - conceived, specified, and designed for High Availability - is being evaluated for suitability for ILC front-end electronics.

  5. Electromagnetic Environmental Effects System Testing

    Science.gov (United States)

    2013-11-20

    localized ( spot ) illumination is adequate to evaluate potential responses by illuminating specific apertures, cables and subsystems. At these...the EMC testing. The Battlefield Functional Area Control System (BFACS), Force XXI Blue Force Tracker (BFT), routers, hubs, switches, etc, are... Laser Printer F1 F1 F1 G G G G G G G G G G G G G G G G G G G G G G G G G G Embedded Training Module F1 F1 F1 G G G G G G G G G G G G G G G G G G G G G

  6. Virtualization in control system environment

    International Nuclear Information System (INIS)

    Shen, L.R.; Liu, D.K.; Wan, T.M.

    2012-01-01

    In large scale distributed control system, there are lots of common service composed an environment for the entire control system, such as the server system for the common software base library, application server, archive server and so on. This paper gives a description of a virtualization realization for control system environment including the virtualization for server, storage, network system and application for the control system. With a virtualization instance of the EPICS based control system environment that was built by the VMware vSphere v4, we tested the whole functionality of this virtualization environment in the SSRF control system, including the common server of the NFS, NIS, NTP, Boot and EPICS base and extension library tools, we also have applied virtualization to application servers such as the Archive, Alarm, EPICS gateway and all of the network based IOC. Specially, we test the high availability and VMotion for EPICS asynchronous IOC successful under the different VLAN configuration of the current SSRF control system network. (authors)

  7. Specification of EDITH motion control system

    International Nuclear Information System (INIS)

    Breitwieser, H.; Frank, A.; Holler, E.; Suess, U.; Leinemann, K.

    1990-09-01

    EDITH is an experimental device for in vessel handling at NET/ITER. The purpose of EDITH is: Testing of ABS (articulated boom system) components; testing and validation of remote handling procedures; testing and validation of ABS end-effectors; testing of ABS control system features and verification of control system concepts. This document, after describing the environment in which the control system is to operate, specifies architecture and functionality to be implemented by the EDITH motion control system software, thereby taking full reference to the control system specification for TARM, which was decided to be the base for the implementation. (orig.) [de

  8. Analysis of quality control tests done by the Canadian power utilities on their external dosimetry systems (June 1988 to May 1993)

    International Nuclear Information System (INIS)

    Butt, K.A.; Poirier, G.S.

    1995-09-01

    The Canadian nuclear power utilities, Hydro-Quebec, New Brunswick Electric Power Commission and Ontario Hydro, use thermoluminescent dosimetry systems to perform their own external beta/gamma dosimetry. In order to help ensure that these systems perform satisfactorily, they are subjected to routine quality control testing by their parent organizations. The test results for the period of June 1988 to May 1993 have been analyzed, at the Atomic Energy Control Board (AECB), using the pass criterion which was originally agreed upon the organizations involved and which is described in section 2.3 of this document. The present analysis offers an indication of the performance of the different sites which operate such a service. Comparisons are made each site's performance during the period June 1985 to May 1988 which has been summarized previously (INFO--0301). Finally, recommendations are made in the hope that they will help the organizations in refining their dosimetry. (author) 1 ref., 7 tabs

  9. Control systems engineering

    CERN Document Server

    Nise, Norman S

    1995-01-01

    This completely updated new edition shows how to use MATLAB to perform control-system calculations. Designed for the professional or engineering student who needs a quick and readable update on designing control systems, the text features a series of tightly focused examples that clearly illustrate each concept of designing control systems. Most chapters conclude with a detailed application from the two case studies that run throughout the book: an antenna asimuth control system and a submarine. The author also refers to many examples of design methods.

  10. Supervisory Control and Diagnostics System Distributed Operating System

    International Nuclear Information System (INIS)

    McGoldrick, P.R.

    1979-01-01

    This paper contains a description of the Supervisory Control and Diagnostics System (SCDS) Distributed Operating System. The SCDS consists of nine 32-bit minicomputers with shared memory. The system's main purpose is to control a large Mirror Fusion Test Facility

  11. Testing of Mortar Systems

    Science.gov (United States)

    2010-03-11

    IEP /TDP) or Independent Assessment Plan (IAP), and the test item and the procedures as outlined in this TOP. The following must also be considered...Command DTIC = Defense Technical Information Center DTP = Detailed Test Plan IAP = Independent Assessment Plan IEP = Independent Evaluation Plan IPT

  12. Nonlinear Dynamic Inversion Baseline Control Law: Flight-Test Results for the Full-scale Advanced Systems Testbed F/A-18 Airplane

    Science.gov (United States)

    Miller, Christopher J.

    2011-01-01

    A model reference nonlinear dynamic inversion control law has been developed to provide a baseline controller for research into simple adaptive elements for advanced flight control laws. This controller has been implemented and tested in a hardware-in-the-loop simulation and in flight. The flight results agree well with the simulation predictions and show good handling qualities throughout the tested flight envelope with some noteworthy deficiencies highlighted both by handling qualities metrics and pilot comments. Many design choices and implementation details reflect the requirements placed on the system by the nonlinear flight environment and the desire to keep the system as simple as possible to easily allow the addition of the adaptive elements. The flight-test results and how they compare to the simulation predictions are discussed, along with a discussion about how each element affected pilot opinions. Additionally, aspects of the design that performed better than expected are presented, as well as some simple improvements that will be suggested for follow-on work.

  13. Discrete control systems

    CERN Document Server

    Okuyama, Yoshifumi

    2014-01-01

    Discrete Control Systems establishes a basis for the analysis and design of discretized/quantized control systemsfor continuous physical systems. Beginning with the necessary mathematical foundations and system-model descriptions, the text moves on to derive a robust stability condition. To keep a practical perspective on the uncertain physical systems considered, most of the methods treated are carried out in the frequency domain. As part of the design procedure, modified Nyquist–Hall and Nichols diagrams are presented and discretized proportional–integral–derivative control schemes are reconsidered. Schemes for model-reference feedback and discrete-type observers are proposed. Although single-loop feedback systems form the core of the text, some consideration is given to multiple loops and nonlinearities. The robust control performance and stability of interval systems (with multiple uncertainties) are outlined. Finally, the monograph describes the relationship between feedback-control and discrete ev...

  14. Biogas plant control system

    International Nuclear Information System (INIS)

    Balasevicius, L.; Dervinis, G.; Macerauskas, V.

    2002-01-01

    This paper presents intelligent control system for the pig farm biogas production process. The system uses a fuzzy logic models based on knowledge of experts and operators. Four fuzzy models are introduced. The adequacy of fuzzy models is verified using real data and MATLAB simulation. Proposed expert system is implemented into traditional SCADA system for biogas process prediction and failure analyzing. (authors)

  15. Control system design guide

    Energy Technology Data Exchange (ETDEWEB)

    Sellers, David; Friedman, Hannah; Haasl, Tudi; Bourassa, Norman; Piette, Mary Ann

    2003-05-01

    The ''Control System Design Guide'' (Design Guide) provides methods and recommendations for the control system design process and control point selection and installation. Control systems are often the most problematic system in a building. A good design process that takes into account maintenance, operation, and commissioning can lead to a smoothly operating and efficient building. To this end, the Design Guide provides a toolbox of templates for improving control system design and specification. HVAC designers are the primary audience for the Design Guide. The control design process it presents will help produce well-designed control systems that achieve efficient and robust operation. The spreadsheet examples for control valve schedules, damper schedules, and points lists can streamline the use of the control system design concepts set forth in the Design Guide by providing convenient starting points from which designers can build. Although each reader brings their own unique questions to the text, the Design Guide contains information that designers, commissioning providers, operators, and owners will find useful.

  16. Control rod shutdown system

    International Nuclear Information System (INIS)

    Miyamoto, Yoshiyuki; Higashigawa, Yuichi.

    1996-01-01

    The present invention provides a control rod terminating system in a BWR type nuclear power plant, which stops an induction electric motor as rapidly as possible to terminate the control rods. Namely, the control rod stopping system controls reactor power by inserting/withdrawing control rods into a reactor by driving them by the induction electric motor. The system is provided with a control device for controlling the control rods and a control device for controlling the braking device. The control device outputs a braking operation signal for actuating the braking device during operation of the control rods to stop the operation of the control rods. Further, the braking device has at least two kinds of breaks, namely, a first and a second brakes. The two kinds of brakes are actuated by receiving the brake operation signals at different timings. The brake device is used also for keeping the control rods after the stopping. Even if a stopping torque of each of the breaks is small, different two kinds of brakes are operated at different timings thereby capable of obtaining a large stopping torque as a total. (I.S.)

  17. Systems and Control Engineering

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 4; Issue 5. Systems and Control Engineering - Control Systems-Analysis and Design. A Rama Kalyan J R Vengateswaran. General Article Volume 4 Issue 5 May 1999 pp 88-94 ...

  18. Case Study: Test Results of a Tool and Method for In-Flight, Adaptive Control System Verification on a NASA F-15 Flight Research Aircraft

    Science.gov (United States)

    Jacklin, Stephen A.; Schumann, Johann; Guenther, Kurt; Bosworth, John

    2006-01-01

    Adaptive control technologies that incorporate learning algorithms have been proposed to enable autonomous flight control and to maintain vehicle performance in the face of unknown, changing, or poorly defined operating environments [1-2]. At the present time, however, it is unknown how adaptive algorithms can be routinely verified, validated, and certified for use in safety-critical applications. Rigorous methods for adaptive software verification end validation must be developed to ensure that. the control software functions as required and is highly safe and reliable. A large gap appears to exist between the point at which control system designers feel the verification process is complete, and when FAA certification officials agree it is complete. Certification of adaptive flight control software verification is complicated by the use of learning algorithms (e.g., neural networks) and degrees of system non-determinism. Of course, analytical efforts must be made in the verification process to place guarantees on learning algorithm stability, rate of convergence, and convergence accuracy. However, to satisfy FAA certification requirements, it must be demonstrated that the adaptive flight control system is also able to fail and still allow the aircraft to be flown safely or to land, while at the same time providing a means of crew notification of the (impending) failure. It was for this purpose that the NASA Ames Confidence Tool was developed [3]. This paper presents the Confidence Tool as a means of providing in-flight software assurance monitoring of an adaptive flight control system. The paper will present the data obtained from flight testing the tool on a specially modified F-15 aircraft designed to simulate loss of flight control faces.

  19. Spacecraft momentum control systems

    CERN Document Server

    Leve, Frederick A; Peck, Mason A

    2015-01-01

    The goal of this book is to serve both as a practical technical reference and a resource for gaining a fuller understanding of the state of the art of spacecraft momentum control systems, specifically looking at control moment gyroscopes (CMGs). As a result, the subject matter includes theory, technology, and systems engineering. The authors combine material on system-level architecture of spacecraft that feature momentum-control systems with material about the momentum-control hardware and software. This also encompasses material on the theoretical and algorithmic approaches to the control of space vehicles with CMGs. In essence, CMGs are the attitude-control actuators that make contemporary highly agile spacecraft possible. The rise of commercial Earth imaging, the advances in privately built spacecraft (including small satellites), and the growing popularity of the subject matter in academic circles over the past decade argues that now is the time for an in-depth treatment of the topic. CMGs are augmented ...

  20. Neutron generator control system

    International Nuclear Information System (INIS)

    Peelman, H.E.; Bridges, J.R.

    1981-01-01

    A method is described of controlling the neutron output of a neutron generator tube used in neutron well logging. The system operates by monitoring the target beam current and comparing a function of this current with a reference voltage level to develop a control signal used in a series regulator to control the replenisher current of the neutron generator tube. (U.K.)

  1. Automated System Tests High-Power MOSFET's

    Science.gov (United States)

    Huston, Steven W.; Wendt, Isabel O.

    1994-01-01

    Computer-controlled system tests metal-oxide/semiconductor field-effect transistors (MOSFET's) at high voltages and currents. Measures seven parameters characterizing performance of MOSFET, with view toward obtaining early indication MOSFET defective. Use of test system prior to installation of power MOSFET in high-power circuit saves time and money.

  2. Flight Test Results from the NF-15B Intelligent Flight Control System (IFCS) Project with Adaptation to a Simulated Stabilator Failure

    Science.gov (United States)

    Bosworth, John T.; Williams-Hayes, Peggy S.

    2010-01-01

    Adaptive flight control systems have the potential to be more resilient to extreme changes in airplane behavior. Extreme changes could be a result of a system failure or of damage to the airplane. A direct adaptive neural-network-based flight control system was developed for the National Aeronautics and Space Administration NF-15B Intelligent Flight Control System airplane and subjected to an inflight simulation of a failed (frozen) (unmovable) stabilator. Formation flight handling qualities evaluations were performed with and without neural network adaptation. The results of these flight tests are presented. Comparison with simulation predictions and analysis of the performance of the adaptation system are discussed. The performance of the adaptation system is assessed in terms of its ability to decouple the roll and pitch response and reestablish good onboard model tracking. Flight evaluation with the simulated stabilator failure and adaptation engaged showed that there was generally improvement in the pitch response; however, a tendency for roll pilot-induced oscillation was experienced. A detailed discussion of the cause of the mixed results is presented.

  3. Dynamic Systems and Control Engineering

    International Nuclear Information System (INIS)

    Kim, Jong Seok

    1994-02-01

    This book deals with introduction of dynamic system and control engineering, frequency domain modeling of dynamic system, temporal modeling of dynamic system, typical dynamic system and automatic control device, performance and stability of control system, root locus analysis, analysis of frequency domain dynamic system, design of frequency domain dynamic system, design and analysis of space, space of control system and digital control system such as control system design of direct digital and digitalization of consecutive control system.

  4. Dynamic Systems and Control Engineering

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jong Seok

    1994-02-15

    This book deals with introduction of dynamic system and control engineering, frequency domain modeling of dynamic system, temporal modeling of dynamic system, typical dynamic system and automatic control device, performance and stability of control system, root locus analysis, analysis of frequency domain dynamic system, design of frequency domain dynamic system, design and analysis of space, space of control system and digital control system such as control system design of direct digital and digitalization of consecutive control system.

  5. Mobile leak testing system

    International Nuclear Information System (INIS)

    Ungr, F.

    The design and implementation are described of a mobile testing unit ULTRATEST M for helium leak tests. The equipment has been developed by Leybold-Heraeus GmbH in Cologne and is in-built in a Mercedes-Benz 208 van. The equipment is designed for the operative use in assembly and construction of nuclear power plants and its throughput is sufficient for checking the whole upper reactor block. It may also be used for removing defects of vacuum equipment requiring a high level of tightness or equally demanding equipment used in the chemical industry. Experience with the equipment is described. (B.S.)

  6. Test system and method

    DEFF Research Database (Denmark)

    2012-01-01

    at a second distance from the centre, the second distance being larger than the first distance, one or more sensors arranged at each fluid channel, wherein the sensors each comprise at least one optical detectable member, the test apparatus further comprising one or more optical sensing devices arranged...... larger than the first distance, one or more sensors arranged at each fluid channel, wherein the sensors each comprise at least one optical detectable member, the test apparatus further comprising one or more optical sensing devices arranged for sensing the at least one optical detectable member...

  7. Relationship between a Centers for Disease Control and Prevention expanded HIV testing initiative and past-year testing by race/ethnicity: a multilevel analysis of the Behavioral Risk Factor Surveillance System.

    Science.gov (United States)

    Gaines, Tommi L; Caldwell, Julia T; Ford, Chandra L; Mulatu, Mesfin S; Godette, Dionne C

    2016-01-01

    The Centers for Disease Control and Prevention's (CDC) expanded testing initiative (ETI) aims to bolster HIV testing among populations disproportionately affected by the HIV epidemic by providing additional funding to health departments serving these communities. ETI prioritizes testing in clinical settings; therefore, we examined the relationship between state-level ETI participation and past-year HIV testing among a racially/ethnically diverse sample of adult respondents to the 2012 Behavioral Risk Factor Surveillance System who accessed health services within the 12 months prior to being interviewed. Controlling for individual- and state-level characteristics in a multilevel logistic regression model, ETI participation was independently and positively associated with past-year testing, but this association varied by race/ethnicity. Hispanics had higher odds (adjusted odds ratio [AOR]: 1.49; 95% CI: 1.11-2.02) and American Indian/Alaska Natives had lower odds (AOR: 0.66; 95% CI: 0.43-0.99) of testing if they resided in states with (vs. without) ETI participation. State-level ETI participation did not significantly alter past-year testing among other racial/ethnic groups. Prioritizing public health resources in states most affected by HIV can improve testing patterns, but other mechanisms likely influence which racial/ethnic groups undergo testing.

  8. Magnetic spectrometer control system

    International Nuclear Information System (INIS)

    Lecca, L.A.; Di Paolo, Hugo; Fernandez Niello, Jorge O.; Marti, Guillermo V; Pacheco, Alberto J.; Ramirez, Marcelo

    2003-01-01

    The design and implementation of a new computerized control system for the several devices of the magnetic spectrometer at TANDAR Laboratory is described. This system, as a main difference from the preexisting one, is compatible with almost any operating systems of wide spread use available in PC. This allows on-line measurement and control of all signals from any terminal of a computer network. (author)

  9. HYBRID VEHICLE CONTROL SYSTEM

    Directory of Open Access Journals (Sweden)

    V. Dvadnenko

    2016-06-01

    Full Text Available The hybrid vehicle control system includes a start–stop system for an internal combustion engine. The system works in a hybrid mode and normal vehicle operation. To simplify the start–stop system, there were user new possibilities of a hybrid car, which appeared after the conversion. Results of the circuit design of the proposed system of basic blocks are analyzed.

  10. The control system

    International Nuclear Information System (INIS)

    1988-01-01

    The present control system has matured both in terms of age and capacity. Thus a new system based on a local area network (LAN) is being developed. A pilot project has been started but, owing to difficulties encountered with the present operating system used with the microprocessors, it has become necessary to reconsider the choice of operating system. A recently-released multi-tasking operating system that runs on the existing hardware has been chosen. 1 fig

  11. Large test rigs verify Clinch River control rod reliability

    International Nuclear Information System (INIS)

    Michael, H.D.; Smith, G.G.

    1983-01-01

    The purpose of the Clinch River control test programme was to use multiple full-scale prototypic control rod systems for verifying the system's ability to perform reliably during simulated reactor power control and emergency shutdown operations. Two major facilities, the Shutdown Control Rod and Maintenance (Scram) facility and the Dynamic and Seismic Test (Dast) facility, were constructed. The test programme of each facility is described. (UK)

  12. System control and communication

    International Nuclear Information System (INIS)

    Bindner, H.; Oestergaard, J.

    2005-01-01

    Rapid and ongoing development in the energy sector has consequences for system control at all levels. In relation to system control and communication the control system is challenged in five important ways: 1) Expectations for security of supply, robustness and vulnerability are becoming more stringent, and the control system plays a big part in meeting these expectations. 2) Services are becoming increasingly based on markets that involve the transmission system operators (TSOs), generators and distribution companies. Timely, accurate and secure communication is essential to the smooth running of the markets. 3) Adding large amounts of renewable energy (RE) to the mix is a challenge for control systems because of the intermittent availability of many RE sources. 4) Increasing the number of active components in the system, such as small CHP plants, micro-CHP and intelligent loads, means that the system control will be much more complex. 5) In the future it is likely that power, heat, gas, transport and communication systems will be tighter coupled and interact much more. (au)

  13. Radiation-hardened control system

    International Nuclear Information System (INIS)

    Vandermolen, R.I.; Smith, S.F.; Emery, M.S.

    1993-01-01

    A radiation-hardened bit-slice control system with associated input/output circuits was developed to prove that programmable circuits could be constructed to successfully implement intelligent functions in a highly radioactive environment. The goal for this effort was to design and test a programmable control system that could withstand a minimum total dose of 10 7 rads (gamma). The Radiation Hardened Control System (RHCS) was tested in operation at a dose rate that ranged up to 135 krad/h, with an average total dose of 10.75 Mrads. Further testing beyond the required 10 7 rads was also conducted. RHCS performed properly through the target dose of 10 7 rads, and sporadic intermittent failures in some programmable logic devices were noted after ∼ 13 Mrads

  14. JT-60 plasma control system

    International Nuclear Information System (INIS)

    Kurihara, K.

    1988-01-01

    JT-60 plasma control can be performed by the supervisory controller, the measurement system and actuators such as the poloidal field coil power supplies, gas injectors, neutral beam injection (NBI) heating system and radio frequency (RF) heating system. One of the most important characteristics of this system is a perfect digital control one composed of mini-computers, fast array processors and CAMAC modules, and it has large flexibility and few troubles to adjust the system. This system started to be operated in April 1985, after the six-year-long design, construction and testing, and have been operated and improved many times for two years. In this paper, the final system specification and its performance are presented aiming at the technological aspect of hardware and software. In addition, and experienced troubles are also presented. (author)

  15. The CEBAF control system

    International Nuclear Information System (INIS)

    Watson, W.A. III.

    1995-01-01

    CEBAF has recently upgraded its accelerator control system to use EPICS, a control system toolkit being developed by a collaboration among laboratories in the US and Europe. The migration to EPICS has taken place during a year of intense commissioning activity, with new and old control systems operating concurrently. Existing CAMAC hardware was preserved by adding a CAMAC serial highway link to VME; newer hardware developments are now primarily in VME. Software is distributed among three tiers of computers: first, workstations and X terminals for operator interfaces and high level applications; second, VME single board computers for distributed access to hardware and for local control processing; third, embedded processors where needed for faster closed loop operation. This system has demonstrated the ability to scale EPICS to controlling thousands of devices, including hundreds of embedded processors, with control distributed among dozens of VME processors executing more than 125,000 EPICS database records. To deal with the large size of the control system, CEBAF has integrated an object oriented database, providing data management capabilities for both low level I/O and high level machine modeling. A new callable interface which is control system independent permits access to live EPICS data, data in other Unix processes, and data contained in the object oriented database

  16. Optimal Switching Table-Based Sliding Mode Control of an Energy Recovery Li-Ion Power Accumulator Battery Pack Testing System

    Directory of Open Access Journals (Sweden)

    Kil To Chong

    2013-10-01

    Full Text Available The main objective of the present work is to apply a sliding mode controller (SMC to medium voltage and high power output energy recovery Li-ion power accumulator battery pack testing systems (ERLPABTSs, which are composed of a three-level neutral-point-clamped (NPC three-phase voltage source inverter (VSI and a two-level buck-boost converter without an isolating transformer. An inner current decoupled control scheme for the aforementioned system is proposed and two sliding mode planes for active and reactive current control are designed based on the control scheme. An optimized switching table for current convergence is used according to the error sign of the equivalent input voltage and feedback voltage. The proposed ERLPABTS could be used to integrate discharging energy into the power grid when performing high accuracy current testing. The active and reactive power references for the grid-connected inverter are determined based on the discharging energy from the DC-DC converter. Simulations and experiments on a laboratory hardware platform using a 175 kW insulated gate bipolar transistor (IGBT-based ERLPABTS have been implemented and verified, and the performance is found satisfactory and superior to conventional ERLPABPTS.

  17. Selection of a Data Acquisition and Controls System Communications and Software Architecture for Johnson Space Center's Space Environment Simulation Laboratory Thermal and Vacuum Test Facilities

    Science.gov (United States)

    Jordan, Eric A.

    2004-01-01

    Upgrade of data acquisition and controls systems software at Johnson Space Center's Space Environment Simulation Laboratory (SESL) involved the definition, evaluation and selection of a system communication architecture and software components. A brief discussion of the background of the SESL and its data acquisition and controls systems provides a context for discussion of the requirements for each selection. Further framework is provided as upgrades to these systems accomplished in the 1990s and in 2003 are compared to demonstrate the role that technological advances have had in their improvement. Both of the selections were similar in their three phases; 1) definition of requirements, 2) identification of candidate products and their evaluation and testing and 3) selection by comparison of requirement fulfillment. The candidates for the communication architecture selection embraced several different methodologies which are explained and contrasted. Requirements for this selection are presented and the selection process is described. Several candidates for the software component of the data acquisition and controls system are identified, requirements for evaluation and selection are presented, and the evaluation process is described.

  18. ISTTOK control system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Ivo S., E-mail: ivoc@ipfn.ist.utl.pt; Duarte, Paulo; Fernandes, Horácio; Valcárcel, Daniel F.; Carvalho, Pedro J.; Silva, Carlos; Duarte, André S.; Neto, André; Sousa, Jorge; Batista, António J.N.; Carvalho, Bernardo B.

    2013-10-15

    Highlights: •ISTTOK fast controller. •All real-time diagnostic and actuators were integrated in the control platform. •100 μs control cycle under the MARTe framework. •The ISTTOK control system upgrade provides reliable operation with an improved operational space. -- Abstract: The ISTTOK tokamak (Ip = 4 kA, BT = 0.5 T, R = 0.46 m, a = 0.085 m) is one of the few tokamaks with regular alternate plasma current (AC) discharges scientific programme. In order to improve the discharge stability and to increase the number of AC discharge cycles a novel control system was developed. The controller acquires data from 50 analog-to-digital converter (ADC) channels of real-time diagnostics and measurements: tomography, Mirnov coils, interferometer, electric probes, sine and cosine probes, bolometer, current delivered by the power supplies, loop voltage and plasma current. The system has a control cycle of 100 μs during which it reads all the diagnostics connected to the advanced telecommunications computing architecture (ATCA) digitizers and sends the control reference to ISTTOK actuators. The controller algorithms are executed on an Intel{sup ®} Q8200 chip with 4 cores running at 2.33 GHz and connected to the I/O interfaces through an ATCA based environment. The real-time control system was programmed in C++ on top of the Multi-threaded Application Real-Time executor (MARTe). To extend the duration of the AC discharges and the plasma stability a new magnetising field power supply was commissioned and the horizontal and vertical field power supplies were also upgraded. The new system also features a user-friendly interface based on HyperText Markup Language (HTML) and Javascript to configure the controller parameters. This paper presents the ISTTOK control system and the consequent update of real-time diagnostics and actuators.

  19. ISTTOK control system upgrade

    International Nuclear Information System (INIS)

    Carvalho, Ivo S.; Duarte, Paulo; Fernandes, Horácio; Valcárcel, Daniel F.; Carvalho, Pedro J.; Silva, Carlos; Duarte, André S.; Neto, André; Sousa, Jorge; Batista, António J.N.; Carvalho, Bernardo B.

    2013-01-01

    Highlights: •ISTTOK fast controller. •All real-time diagnostic and actuators were integrated in the control platform. •100 μs control cycle under the MARTe framework. •The ISTTOK control system upgrade provides reliable operation with an improved operational space. -- Abstract: The ISTTOK tokamak (Ip = 4 kA, BT = 0.5 T, R = 0.46 m, a = 0.085 m) is one of the few tokamaks with regular alternate plasma current (AC) discharges scientific programme. In order to improve the discharge stability and to increase the number of AC discharge cycles a novel control system was developed. The controller acquires data from 50 analog-to-digital converter (ADC) channels of real-time diagnostics and measurements: tomography, Mirnov coils, interferometer, electric probes, sine and cosine probes, bolometer, current delivered by the power supplies, loop voltage and plasma current. The system has a control cycle of 100 μs during which it reads all the diagnostics connected to the advanced telecommunications computing architecture (ATCA) digitizers and sends the control reference to ISTTOK actuators. The controller algorithms are executed on an Intel ® Q8200 chip with 4 cores running at 2.33 GHz and connected to the I/O interfaces through an ATCA based environment. The real-time control system was programmed in C++ on top of the Multi-threaded Application Real-Time executor (MARTe). To extend the duration of the AC discharges and the plasma stability a new magnetising field power supply was commissioned and the horizontal and vertical field power supplies were also upgraded. The new system also features a user-friendly interface based on HyperText Markup Language (HTML) and Javascript to configure the controller parameters. This paper presents the ISTTOK control system and the consequent update of real-time diagnostics and actuators

  20. National Ignition Facility TestController for automated and manual testing

    Energy Technology Data Exchange (ETDEWEB)

    Zielinski, Jason, E-mail: fishler2@llnl.gov [Lawrence Livermore National Laboratory, Livermore, CA 94551 (United States)

    2012-12-15

    The Controls and Information Systems (CIS) organization for the National Ignition Facility (NIF) has developed controls, configuration and analysis software applications that combine for several million lines of code. The team delivers updates throughout the year, from major releases containing hundreds of changes to patch releases containing a small number of focused updates. To ensure the quality of each delivery, manual and automated tests are performed using the NIF TestController test infrastructure. The TestController system provides test inventory management, test planning, automated and manual test execution, release testing summaries and results search, all through a web browser interface. As part of the three-stage software testing strategy, the NIF TestController system helps plan, evaluate and track the readiness of each release to the NIF production environment. After several years of use in testing NIF software applications, the TestController's manual testing features have been leveraged for verifying the installation and operation of NIF Target Diagnostic hardware. The TestController recorded its first test results in 2004. Today, the system has recorded the execution of more than 160,000 tests and continues to play a central role in ensuring that NIF hardware and software meet the requirements of a high reliability facility. This paper describes the TestController system and discusses its use in assuring the quality of software delivered to the NIF.

  1. National Ignition Facility TestController for automated and manual testing

    International Nuclear Information System (INIS)

    Zielinski, Jason

    2012-01-01

    The Controls and Information Systems (CIS) organization for the National Ignition Facility (NIF) has developed controls, configuration and analysis software applications that combine for several million lines of code. The team delivers updates throughout the year, from major releases containing hundreds of changes to patch releases containing a small number of focused updates. To ensure the quality of each delivery, manual and automated tests are performed using the NIF TestController test infrastructure. The TestController system provides test inventory management, test planning, automated and manual test execution, release testing summaries and results search, all through a web browser interface. As part of the three-stage software testing strategy, the NIF TestController system helps plan, evaluate and track the readiness of each release to the NIF production environment. After several years of use in testing NIF software applications, the TestController's manual testing features have been leveraged for verifying the installation and operation of NIF Target Diagnostic hardware. The TestController recorded its first test results in 2004. Today, the system has recorded the execution of more than 160,000 tests and continues to play a central role in ensuring that NIF hardware and software meet the requirements of a high reliability facility. This paper describes the TestController system and discusses its use in assuring the quality of software delivered to the NIF.

  2. Submicronic Particle Measurement Instrumentation Test Bench Data Acquisition and Control System; Sistema de Toma de Datos y Control de un Banco de Calibracion de Instrumentacion para Medida de Particulas Submicrometricas

    Energy Technology Data Exchange (ETDEWEB)

    Alberdi, J; Barcala, J M; Gomez, F J; Molinero, A; Navarrete, J J [Ciemat. Madrid (Spain)

    1999-05-01

    This document describes the SAD-100 system characteristics. The unit makes the instrumentation test bench data acquisition and control, SAD-100 was designed and developed by Electronic and Automation Area (CIEMAT) and Aerosol Technology in Energy Generation Project (CIEMAT). (Author) 2 refs.

  3. Control system integration

    CERN Document Server

    Shea, T J

    2008-01-01

    This lecture begins with a definition of an accelerator control system, and then reviews the control system architectures that have been deployed at the larger accelerator facilities. This discussion naturally leads to identification of the major subsystems and their interfaces. We shall explore general strategies for integrating intelligent devices and signal processing subsystems based on gate arrays and programmable DSPs. The following topics will also be covered: physical packaging; timing and synchronization; local and global communication technologies; interfacing to machine protection systems; remote debugging; configuration management and source code control; and integration of commercial software tools. Several practical realizations will be presented.

  4. Treatment of chronically depressed patients: A multisite randomized controlled trial testing the effectiveness of 'Cognitive Behavioral Analysis System of Psychotherapy' (CBASP for chronic depressions versus usual secondary care

    Directory of Open Access Journals (Sweden)

    Penninx Brenda WJH

    2008-03-01

    Full Text Available Abstract Background 'Cognitive Behavioral Analysis System of Psychotherapy' (CBASP is a form of psychotherapy specifically developed for patients with chronic depression. In a study in the U.S., remarkable favorable effects of CBASP have been demonstrated. However, no other studies have as yet replicated these findings and CBASP has not been tested outside the United States. This protocol describes a randomized controlled trial on the effectiveness of CBASP in the Netherlands. Methods/Design The purpose of the present paper is to report the study protocol of a multisite randomized controlled trial testing the effectiveness of 'Cognitive Behavioral Analysis System of Psychotherapy' (CBASP for chronic depression in the Netherlands. In this study, CBASP in combination with medication, will be tested versus usual secondary care in combination with medication. The aim is to recruit 160 patients from three mental health care organizations. Depressive symptoms will be assessed at baseline, after 8 weeks, 16 weeks, 32 weeks and 52 weeks, using the 28-item Inventory for Depressive Symptomatology (IDS. Effect modification by co morbid anxiety, alcohol consumption, general and social functioning and working alliance will be tested. GEE analyses of covariance, controlling for baseline value and center will be used to estimate the overall treatment effectiveness (difference in IDS score at post-treatment and follow up. The primary analysis will be by 'intention to treat' using double sided tests. An economic analysis will compare the two groups in terms of mean costs and cost-effectiveness from a societal perspective. Discussion The study will provide an answer to the question whether the favorable effects of CBASP can be replicated outside the US. Trial Registration The Dutch Cochrane Center, NTR1090.

  5. Direct provision versus facility collection of HIV self-tests among female sex workers in Uganda: A cluster-randomized controlled health systems trial.

    Directory of Open Access Journals (Sweden)

    Katrina Ortblad

    2017-11-01

    Full Text Available HIV self-testing allows HIV testing at any place and time and without health workers. HIV self-testing may thus be particularly useful for female sex workers (FSWs, who should test frequently but face stigma and financial and time barriers when accessing healthcare facilities.We conducted a cluster-randomized controlled health systems trial among FSWs in Kampala, Uganda, to measure the effect of 2 HIV self-testing delivery models on HIV testing and linkage to care outcomes. FSW peer educator groups (1 peer educator and 8 participants were randomized to either (1 direct provision of HIV self-tests, (2 provision of coupons for free collection of HIV self-tests in a healthcare facility, or (3 standard of care HIV testing. We randomized 960 participants in 120 peer educator groups from October 18, 2016, to November 16, 2016. Participants' median age was 28 years (IQR 24-32. Our prespecified primary outcomes were self-report of any HIV testing at 1 month and at 4 months; our prespecified secondary outcomes were self-report of HIV self-test use, seeking HIV-related medical care and ART initiation. In addition, we analyzed 2 secondary outcomes that were not prespecified: self-report of repeat HIV testing-to understand the intervention effects on frequent testing-and self-reported facility-based testing-to quantify substitution effects. Participants in the direct provision arm were significantly more likely to have tested for HIV than those in the standard of care arm, both at 1 month (risk ratio [RR] 1.33, 95% CI 1.17-1.51, p < 0.001 and at 4 months (RR 1.14, 95% CI 1.07-1.22, p < 0.001. Participants in the direct provision arm were also significantly more likely to have tested for HIV than those in the facility collection arm, both at 1 month (RR 1.18, 95% CI 1.07-1.31, p = 0.001 and at 4 months (RR 1.03, 95% CI 1.01-1.05, p = 0.02. At 1 month, fewer participants in the intervention arms had sought medical care for HIV than in the standard of care arm

  6. Manual control of unstable systems

    Science.gov (United States)

    Allen, R. W.; Hogue, J. R.; Parseghian, Z.

    1986-01-01

    Under certain operational regimes and failure modes, air and ground vehicles can present the human operator with a dynamically unstable or divergent control task. Research conducted over the last two decades has explored the ability of the human operator to control unstable systems under a variety of circumstances. Past research is reviewed and human operator control capabilities are summarized. A current example of automobile directional control under rear brake lockup conditions is also reviewed. A control system model analysis of the driver's steering control task is summarized, based on a generic driver/vehicle model presented at last year's Annual Manual. Results from closed course braking tests are presented that confirm the difficulty the average driver has in controlling the unstable directional dynamics arising from rear wheel lockup.

  7. Vacuum control system of VEC

    International Nuclear Information System (INIS)

    Roy, Anindya; Bhole, R.B.; Bandopadhyay, D.L.; Mukhopadhyay, B.; Pal, Sarbajit; Sarkar, D.

    2009-01-01

    As a part of modernization of VEC (Variable Energy Cyclotron), the Vacuum Control System is being upgraded to PLC based automated system from initial Relay based Manual system. EPICS (Experimental Physics and Industrial Control System), a standard open source software tool for designing distributed control system, is chosen for developing the supervisory control software layer, leading towards a unified distributed control architecture of VEC Control System. A Modbus - TCP based IOC (I/O Controller) has been developed to communicate control data to PLC using Ethernet-TCP LAN. Keeping in mind, the operators' familiarity with MS-Windows, a MS-Windows based operator interface is developed using VB6. It is also used to test and evaluate EPICS compatibility to MS Windows. Several MS Windows ActiveX components e.g. text display, image display, alarm window, set-point input etc. have been developed incorporating Channel Access library of EPICS. Use of such components ease the programming complexity and reduce developmental time of the operator interface. The system is in the final phase of commissioning. (author)

  8. Analysis of quality control tests done by the Canadian power utilities on their external dosimetry systems (June 1985 to May 1988)

    International Nuclear Information System (INIS)

    Poirier, G.S.

    1989-04-01

    The Canadian nuclear power utilities, Hydro Quebec, New Brunswick Electric Power Commission and Ontario Hydro, use thermoluminescent dosimetry systems to perform their own external beta/gamma dosimetry. In order to help ensure that these systems perform satisfactorily, they are subjected to routine quality control testing by their parent organizations. The test results for the period of June 1985 to May 1988 have been analyzed, at the AECB, using the pass criterion which was originally agreed upon by the organizations involved. The present analysis offers a comparison of the performance of the different sites which operate such a service. Finally, recommendations are made in the hope that they will help the organizations in refining their dosimetry

  9. NWTC Researchers Field-Test Advanced Control Turbine Systems to Increase Performance, Decrease Structural Loading of Wind Turbines and Plants

    Energy Technology Data Exchange (ETDEWEB)

    2015-08-01

    Researchers at the National Renewable Energy Laboratory's (NREL's) National Wind Technology Center (NWTC) are studying component controls, including new advanced actuators and sensors, for both conventional turbines as well as wind plants. This research will help develop innovative control strategies that reduce aerodynamic structural loads and improve performance. Structural loads can cause damage that increase maintenance costs and shorten the life of a turbine or wind plant.

  10. FIELD TEST PROGRAM TO DEVELOP COMPREHENSIVE DESIGN, OPERATING AND COST DATA FOR MERCURY CONTROL SYSTEMS ON NON-SCRUBBED COAL-FIRED BOILERS

    International Nuclear Information System (INIS)

    C. Jean Bustard

    2001-01-01

    With the Nation's coal-burning utilities facing the possibility of tighter controls on mercury pollutants, the U.S. Department of Energy is funding projects that could offer power plant operators better ways to reduce these emissions at much lower costs. Mercury is known to have toxic effects on the nervous system of humans and wildlife. Although it exists only in trace amounts in coal, mercury is released when coal burns and can accumulate on land and in water. In water, bacteria transform the metal into methylmercury, the most hazardous form of the metal. Methylmercury can collect in fish and marine mammals in concentrations hundreds of thousands times higher than the levels in surrounding waters. One of the goals of DOE is to develop technologies by 2005 that will be capable of cutting mercury emissions 50 to 70 percent at well under one-half of today's costs. ADA Environmental Solutions (ADA-ES) is managing a project to test mercury control technologies at full scale at four different power plants from 2000 to 2003. The ADA-ES project is focused on those power plants that are not equipped with wet flue gas desulfurization systems. ADA-ES will develop a portable system that will be moved to four different utility power plants for field testing. Each of the plants is equipped with either electrostatic precipitators or fabric filters to remove solid particles from the plant's flue gas. ADA-ES's technology will inject a dry sorbent, such as fly ash or activated carbon, that removes the mercury and makes it more susceptible to capture by the particulate control devices. A fine water mist may be sprayed into the flue gas to cool its temperature to the range where the dry sorbent is most effective. PG and E National Energy Group is providing two test sites that fire bituminous coals and are both equipped with electrostatic precipitators and carbon/ash separation systems. Wisconsin Electric Power Company is providing a third test site that burns Powder River Basin (PRB

  11. FIELD TEST PROGRAM TO DEVELOP COMPREHENSIVE DESIGN, OPERATING AND COST DATA FOR MERCURY CONTROL SYSTEMS ON NON-SCRUBBED COAL-FIRED BOILERS

    International Nuclear Information System (INIS)

    C. Jean Bustard

    2002-01-01

    With the Nation's coal-burning utilities facing the possibility of tighter controls on mercury pollutants, the U.S. Department of Energy is funding projects that could offer power plant operators better ways to reduce these emissions at much lower costs. Mercury is known to have toxic effects on the nervous system of humans and wildlife. Although it exists only in trace amounts in coal, mercury is released when coal burns and can accumulate on land and in water. In water, bacteria transform the metal into methylmercury, the most hazardous form of the metal. Methylmercury can collect in fish and marine mammals in concentrations hundreds of thousands times higher than the levels in surrounding waters. One of the goals of DOE is to develop technologies by 2005 that will be capable of cutting mercury emissions 50 to 70 percent at well under one-half of today's costs. ADA Environmental Solutions (ADA-ES) is managing a project to test mercury control technologies at full scale at four different power plants from 2000-2003. The ADA-ES project is focused on those power plants that are not equipped with wet flue gas desulfurization systems. ADA-ES will develop a portable system that will be moved to four different utility power plants for field testing. Each of the plants is equipped with either electrostatic precipitators or fabric filters to remove solid particles from the plant's flue gas. ADA-ES's technology will inject a dry sorbent, such as fly ash or activated carbon, that removes the mercury and makes it more susceptible to capture by the particulate control devices. A fine water mist may be sprayed into the flue gas to cool its temperature to the range where the dry sorbent is most effective. PG and E National Energy Group is providing two test sites that fire bituminous coals and are both equipped with electrostatic precipitators and carbon/ash separation systems. Wisconsin Electric Power Company is providing a third test site that burns Powder River Basin (PRB

  12. FIELD TEST PROGRAM TO DEVELOP COMPREHENSIVE DESIGN, OPERATING AND COST DATA FOR MERCURY CONTROL SYSTEMS ON NON-SCRUBBED COAL-FIRED BOILERS

    International Nuclear Information System (INIS)

    C. Jean Bustard

    2001-01-01

    With the Nation's coal-burning utilities facing the possibility of tighter controls on mercury pollutants, the U.S. Department of Energy is funding projects that could offer power plant operators better ways to reduce these emissions at much lower costs. Mercury is known to have toxic effects on the nervous system of humans and wildlife. Although it exists only in trace amounts in coal, mercury is released when coal burns and can accumulate on land and in water. In water, bacteria transform the metal into methylmercury, the most hazardous form of the metal. Methylmercury can collect in fish and marine mammals in concentrations hundreds of thousands times higher than the levels in surrounding waters. One of the goals of DOE is to develop technologies by 2005 that will be capable of cutting mercury emissions 50 to 70 percent at well under one-half of today's costs. ADA Environmental Solutions (ADA-ES) is managing a project to test mercury control technologies at full scale at four different power plants from 2000-2003. The ADA-ES project is focused on those power plants that are not equipped with wet flue gas desulfurization systems. ADA-ES will develop a portable system that will be moved to four different utility power plants for field testing. Each of the plants is equipped with either electrostatic precipitators or fabric filters to remove solid particles from the plant's flue gas. ADA-ES's technology will inject a dry sorbent, such as fly ash or activated carbon, that removes the mercury and makes it more susceptible to capture by the particulate control devices. A fine water mist may be sprayed into the flue gas to cool its temperature to the range where the dry sorbent is most effective. PG and E National Energy Group is providing two test sites that fire bituminous coals and are both equipped with electrostatic precipitators and carbon/ash separation systems. Wisconsin Electric Power Company is providing a third test site that burns Powder River Basin coal

  13. FIELD TEST PROGRAM TO DEVELOP COMPREHENSIVE DESIGN, OPERATING AND COST DATA FOR MERCURY CONTROL SYSTEMS ON NON-SCRUBBED COAL-FIRED BOILERS

    International Nuclear Information System (INIS)

    C. Jean Bustard

    2001-01-01

    With the Nation's coal-burning utilities facing the possibility of tighter controls on mercury pollutants, the U.S. Department of Energy is funding projects that could offer power plant operators better ways to reduce these emissions at much lower costs. Mercury is known to have toxic effects on the nervous system of humans and wildlife. Although it exists only in trace amounts in coal, mercury is released when coal burns and can accumulate on land and in water. In water, bacteria transform the metal into methylmercury, the most hazardous form of the metal. Methylmercury can collect in fish and marine mammals in concentrations hundreds of thousands times higher than the levels in surrounding waters. One of the goals of DOE is to develop technologies by 2005 that will be capable of cutting mercury emissions 50 to 70 percent at well under one-half of today's costs. ADA Environmental Solutions (ADA-ES) is managing a project to test mercury control technologies at full scale at four different power plants from 2000-2003. The ADA-ES project is focused on those power plants that are not equipped with wet flue gas desulfurization systems. ADA-ES will develop a portable system that will be moved to four different utility power plants for field testing. Each of the plants is equipped with either electrostatic precipitators or fabric filters to remove solid particles from the plant's flue gas. ADA-ES's technology will inject a dry sorbent, such as fly ash or activated carbon, that removes the mercury and makes it more susceptible to capture by the particulate control devices. A fine water mist may be sprayed into the flue gas to cool its temperature to the range where the dry sorbent is most effective. PG and E National Energy Group is providing two test sites that fire bituminous coals and are both equipped with electrostatic precipitators and carbon/ash separation systems. Wisconsin Electric Power Company is providing a third test site that burns Powder River Basin (PRB

  14. Water electrolysis system refurbishment and testing

    Science.gov (United States)

    Greenough, B. M.

    1972-01-01

    The electrolytic oxygen generator for the back-up water electrolysis system in a 90-day manned test was refurbished, improved and subjected to a 182-day bench test. The performance of the system during the test demonstrated the soundness of the basic electrolysis concept, the high development status of the automatic controls which allowed completely hands-off operation, and the capability for orbital operation. Some design improvements are indicated.

  15. The Epicure Control System

    International Nuclear Information System (INIS)

    Dambik, E.; Kline, D.; West, R.

    1993-09-01

    The Epicure Control System supports the Fermilab fixed target physics program. The system is distributed across a network of many different types of components. The use of multiple layers on interfaces for communication between logical tasks fits the client-server model. Physical devices are read and controlled using symbolic references entered into a database with an editor utility. The database system consists of a central portion containing all device information and optimized portions distributed among many nodes. Updates to the database are available throughout the system within minutes after being requested

  16. Control systems under attack?

    CERN Document Server

    Lüders, Stefan

    2005-01-01

    The enormous growth of the Internet during the last decade offers new means to share and distribute both information and data. In Industry, this results in a rapprochement of the production facilities, i.e. their Process Control and Automation Systems, and the data warehouses. At CERN, the Internet opens the possibility to monitor and even control (parts of) the LHC and its four experiments remotely from anywhere in the world. However, the adoption of standard IT technologies to Distributed Process Control and Automation Systems exposes inherent vulnerabilities to the world. The Teststand On Control System Security at CERN (TOCSSiC) is dedicated to explore the vulnerabilities of arbitrary Commercial-Of-The-Shelf hardware devices connected to standard Ethernet. As such, TOCSSiC should discover their vulnerabilities, point out areas of lack of security, and address areas of improvement which can then be confidentially communicated to manufacturers. This paper points out risks of accessing the Control and Automa...

  17. Tautological control systems

    CERN Document Server

    Lewis, Andrew D

    2014-01-01

    This brief presents a description of a new modelling framework for nonlinear/geometric control theory. The framework is intended to be—and shown to be—feedback-invariant. As such, Tautological Control Systems provides a platform for understanding fundamental structural problems in geometric control theory. Part of the novelty of the text stems from the variety of regularity classes, e.g., Lipschitz, finitely differentiable, smooth, real analytic, with which it deals in a comprehensive and unified manner. The treatment of the important real analytic class especially reflects recent work on real analytic topologies by the author. Applied mathematicians interested in nonlinear and geometric control theory will find this brief of interest as a starting point for work in which feedback invariance is important. Graduate students working in control theory may also find Tautological Control Systems to be a stimulating starting point for their research.

  18. Reset Control Systems

    CERN Document Server

    Baños, Alfonso

    2012-01-01

    Reset Control Systems addresses the analysis for reset control treating both its basic form which requires only that the state of the controller be reinitialized to zero (the reset action) each time the tracking error crosses zero (the reset condition), and some useful variations of the reset action (partial reset with fixed or variable reset percentage) and of the reset condition (fixed or variable reset band and anticipative reset). The issues regarding reset control – concepts and motivation; analysis tools; and the application of design methodologies to real-world examples – are given comprehensive coverage. The text opens with an historical perspective which moves from the seminal work of the Clegg integrator and Horowitz FORE to more recent approaches based on impulsive/hybrid control systems and explains the motivation for reset compensation. Preliminary material dealing with notation, basic definitions and results, and with the definition of the control problem under study is also included. The fo...

  19. Flight control actuation system

    Science.gov (United States)

    Wingett, Paul T. (Inventor); Gaines, Louie T. (Inventor); Evans, Paul S. (Inventor); Kern, James I. (Inventor)

    2006-01-01

    A flight control actuation system comprises a controller, electromechanical actuator and a pneumatic actuator. During normal operation, only the electromechanical actuator is needed to operate a flight control surface. When the electromechanical actuator load level exceeds 40 amps positive, the controller activates the pneumatic actuator to offset electromechanical actuator loads to assist the manipulation of flight control surfaces. The assistance from the pneumatic load assist actuator enables the use of an electromechanical actuator that is smaller in size and mass, requires less power, needs less cooling processes, achieves high output forces and adapts to electrical current variations. The flight control actuation system is adapted for aircraft, spacecraft, missiles, and other flight vehicles, especially flight vehicles that are large in size and travel at high velocities.

  20. Reactor limit control system

    International Nuclear Information System (INIS)

    Rubbel, F.E.

    1982-01-01

    The very extensive use of limitations in the operational field between protection system and closed-loop controls is an important feature of German understanding of operational safety. The design of limitations is based on very large activities in the computational field but mostly on the high level of the plant-wide own commissioning experience of a turnkey contractor. Limitations combine intelligence features of closed-loop controls with the high availability of protection systems. (orig.)

  1. Fluid flow control system

    International Nuclear Information System (INIS)

    Rion, Jacky.

    1982-01-01

    Fluid flow control system featuring a series of grids placed perpendicular to the fluid flow direction, characterized by the fact that it is formed of a stack of identical and continuous grids, each of which consists of identical meshes forming a flat lattice. The said meshes are offset from one grid to the next. This system applies in particular to flow control of the coolant flowing at the foot of an assembly of a liquid metal cooled nuclear reactor [fr

  2. Internal control system

    OpenAIRE

    Pavésková, Ivana

    2014-01-01

    Dissertation focuse on the internal control system in the enterprises, aims to map the control system by focusing on the purchasing department. I focused on the purchasing process, because with an increasing trends of outsourcing services and the increasing interconnectedness of enterprises increases the risk of fraud currently in the purchasing process. To the research was selected the sample of companies from the banking and non-banking environment, to which were sent a questionnaire focusi...

  3. Contribution of the JRC to test and validate innovation systems for earthquake protection and control of vibration of structures

    International Nuclear Information System (INIS)

    Renda, Vito

    2002-01-01

    The mission of JRC is to provide scientific and technical support for the conception, development and monitoring of EU policies. The task of IPSC is to provide cyber-security and fight against the fraud; natural, technological and economic risks; humanitarian security, non-proliferation and nuclear safeguards. The Structural mechanics laboratory supplies pseudo-dynamic testing of full/large scale models and structures. Earthquake simulation is provided by two complementary approaches: shaking table, and reaction wall. The main objectives of the large scale testing are: to calibrate analytical models suitable for different classes of structures; to validate rules of norms and standards; and to contribute to the development of innovative technologies for the protection of structures of both civil and architectural interest. Seismic isolation program deals with validation of the pseudo-dynamic method for testing large models of base isolated structures

  4. Systems and Control Engineering

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 4; Issue 1. Systems and Control Engineering - Notions of Control. A Rama Kalyan J R Vengateswaran. General Article Volume 4 Issue 1 January 1999 pp 45-52. Fulltext. Click here to view fulltext PDF. Permanent link:

  5. Controllability of nilpotent systems

    International Nuclear Information System (INIS)

    Bravo, V.A.; Martin, L.S.

    1993-02-01

    The purpose of this paper is to investigate algebraic conditions which give information about the controllability of invariant control systems on nilpotent Lie groups. With the same purpose, the authors use the co-adjoint representation and define the concept of symplectic vectors. We study the existence of these objects to analyze the controllability. In particular, we obtain a characterization when G is simply connected. (author). 9 refs

  6. Commutated automatic gain control system

    Science.gov (United States)

    Yost, S. R.

    1982-01-01

    A commutated automatic gain control (AGC) system was designed and built for a prototype Loran C receiver. The receiver uses a microcomputer to control a memory aided phase-locked loop (MAPLL). The microcomputer also controls the input/output, latitude/longitude conversion, and the recently added AGC system. The circuit designed for the AGC is described, and bench and flight test results are presented. The AGC circuit described actually samples starting at a point 40 microseconds after a zero crossing determined by the software lock pulse ultimately generated by a 30 microsecond delay and add network in the receiver front end envelope detector.

  7. Test System Impact on System Availability

    DEFF Research Database (Denmark)

    Pau, L. F.

    1987-01-01

    The specifications are presented for an imperfect automatic test system (ATS) (test frequency distribution, reliability, false alarm rate, nondetection rate) in order to account for the availability, readiness, mean time between unscheduled repairs (MTBUR), reliability, and maintenance of the sys......The specifications are presented for an imperfect automatic test system (ATS) (test frequency distribution, reliability, false alarm rate, nondetection rate) in order to account for the availability, readiness, mean time between unscheduled repairs (MTBUR), reliability, and maintenance...... of the system subject to monitoring and test. A time-dependent Markov model is presented, and applied in three cases, with examples of numerical results provided for preventive maintenance decisions, design of an automatic test system, buffer testing in computers, and data communications....

  8. Design, development and testing of real time control and data acquisition system for R&D IC H&CD source

    Energy Technology Data Exchange (ETDEWEB)

    Rajnish, Kumar, E-mail: krajnish@iter-india.org [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Soni, Dipal; Verma, Sriprakash; Patel, Hriday; Trivedi, Rajesh; Singh, Raghuraj; Patel, Manoj; Mukherjee, Aparajita [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Makadia, Keyur [Optimized Solutions Pvt. Ltd., Ahmedabad, Gujarat (India)

    2016-11-15

    Highlights: • Application program of LCU is developed using LabVIEW™ to operate megawatt RF source. • PXI 6133 module is used for acquiring data with 1 MHz sampling frequency in trigger mode. • PXI 6255 is used for continuous acquisition with 1 KHz sampling frequency. • PXI 7841 R is used for hard wired fast protection function and for real time control loop. • Schneider PLC is used to develop sequence control system. - Abstract: One of the important auxiliary heating and current drive systems for ITER experiment is Ion Cyclotron Heating & Current Drive (IC H&CD) system. ITER requires 1 prototype and 8 independent RF Sources, each having capability to deliver constant output power of 2.5 MW at VSWR 2 in the frequency range of 35–65 MHz. To meet the ITER requirement, an R&D program has been launched to identify the final stage tube (Tetrode/Diacrode) for MW level RF amplifier, along with other critical components. Under this R&D program, single chain of RF cascaded amplifiers, consisting of low & high power RF sections, auxiliary power supply, Anode power supply and test bench simulating ITER requirement, are being developed. To ensure reliable and safe operation of the entire system, PLC/PXI based Local Control Unit (LCU) is developed. PLC based sequential control system is developed for sequential biasing of electrodes of high power vacuum tubes (Tetrode/Diacrode). To protect the RF Source against critical fault condition, local protection logic is developed using PXI-7841R, which will ensure fast shut off (<10 μs) of RF and power supplies. Constant and stable power output even with variable load condition (up to VSWR 2) is achieved by employing two real time feedback control loops-one for making constant output power and the other one for optimizing anode & screen grid dissipation. For fault/offline analysis, event based acquisition and logging functionality is provided that acquires and logs data at 1 μs sampling rate for 100 ms pre and post time

  9. CEBAF control system

    International Nuclear Information System (INIS)

    Bork, R.; Grubb, C.; Lahti, G.; Navarro, E.; Sage, J.

    1989-01-01

    A logic-based computer control system is in development at CEBAF. This Unix/C language software package, running on a distributed, hierarchical system of workstation and supervisory minicomputers, interfaces to hardware via CAMAC. Software aspects to be covered are ladder logic, interactive database generation, networking, and graphic user interfaces. 1 fig

  10. PSR control system

    International Nuclear Information System (INIS)

    Clout, P.N.; Conley, A.P.; Bair, S.S.; Fuka, M.A.; Sandford, E.L.; Lander, R.F.; Wells, F.D.

    1985-01-01

    The control system for the Proton Storage Ring at Los Alamos has been essentially completed. Modifications are being applied that are required in the light of machine physics and operating experience. The present design of the system is described and future planned modifications are indicated

  11. Environment control system

    International Nuclear Information System (INIS)

    Sammarone, D.G.

    1978-01-01

    Disclosed is a system for controlling the environment of an enclosed area in nuclear reactor installations. The system permits the changing of the environment from nitrogen to air, or from air to nitrogen, without the release of any radioactivity or process gas to the outside atmosphere

  12. Preoperational test report, primary ventilation condensate system

    Energy Technology Data Exchange (ETDEWEB)

    Clifton, F.T.

    1997-01-29

    Preoperational test report for Primary Ventilation Condensate System, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides a collection point for condensate generated by the W-030 primary vent offgas cooling system serving tanks AYIOI, AY102, AZIOI, AZI02. The system is located inside a shielded ventilation equipment cell and consists of a condensate seal pot, sampling features, a drain line to existing Catch Tank 241-AZ-151, and a cell sump jet pump. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

  13. The ISOLDE control system

    Science.gov (United States)

    Deloose, I.; Pace, A.

    1994-12-01

    The two CERN isotope separators named ISOLDE have been running on the new Personal Computer (PC) based control system since April 1992. The new architecture that makes heavy use of the commercial software and hardware of the PC market has been implemented on the 1700 geographically distributed control channels of the two separators and their experimental area. Eleven MSDOS Intel-based PCs with approximately 80 acquisition and control boards are used to access the equipment and are controlled from three PCs running Microsoft Windows used as consoles through a Novell Local Area Network. This paper describes the interesting solutions found and discusses the reduced programming workload and costs that have been obtained.

  14. Large-Scale Mercury Control Technology Testing for Lignite-Fired Utilities - Oxidation Systems for Wet FGD

    Energy Technology Data Exchange (ETDEWEB)

    Steven A. Benson; Michael J. Holmes; Donald P. McCollor; Jill M. Mackenzie; Charlene R. Crocker; Lingbu Kong; Kevin C. Galbreath

    2007-03-31

    Mercury (Hg) control technologies were evaluated at Minnkota Power Cooperative's Milton R. Young (MRY) Station Unit 2, a 450-MW lignite-fired cyclone unit near Center, North Dakota, and TXU Energy's Monticello Steam Electric Station (MoSES) Unit 3, a 793-MW lignite--Powder River Basin (PRB) subbituminous coal-fired unit near Mt. Pleasant, Texas. A cold-side electrostatic precipitator (ESP) and wet flue gas desulfurization (FGD) scrubber are used at MRY and MoSES for controlling particulate and sulfur dioxide (SO{sub 2}) emissions, respectively. Several approaches for significantly and cost-effectively oxidizing elemental mercury (Hg{sup 0}) in lignite combustion flue gases, followed by capture in an ESP and/or FGD scrubber were evaluated. The project team involved in performing the technical aspects of the project included Babcock & Wilcox, the Energy & Environmental Research Center (EERC), the Electric Power Research Institute, and URS Corporation. Calcium bromide (CaBr{sub 2}), calcium chloride (CaCl{sub 2}), magnesium chloride (MgCl{sub 2}), and a proprietary sorbent enhancement additive (SEA), hereafter referred to as SEA2, were added to the lignite feeds to enhance Hg capture in the ESP and/or wet FGD. In addition, powdered activated carbon (PAC) was injected upstream of the ESP at MRY Unit 2. The work involved establishing Hg concentrations and removal rates across existing ESP and FGD units, determining costs associated with a given Hg removal efficiency, quantifying the balance-of-plant impacts of the control technologies, and facilitating technology commercialization. The primary project goal was to achieve ESP-FGD Hg removal efficiencies of {ge}55% at MRY and MoSES for about a month.

  15. TMX magnet control system

    International Nuclear Information System (INIS)

    Goerz, D.A.

    1978-01-01

    A control system utilizing a microcomputer has been developed that controls the power supplies driving the Tandem Mirror Experiment (TMX) magnet set and monitors magnet coil operation. The magnet set consists of 18 magnet coils that are driven by 26 dc power supplies. There are two possible modes of operation with this system: a pulse mode where the coils are pulsed on for several seconds with a dc power consumption of 16 MW; and a continuous mode where the coils can run steady state at 10 percent of maximum current ratings. The processor has been given an active control role and serves as an interface between the operator and electronic circuitry that controls the magnet power supplies. This microcomputer also collects and processes data from many analog singal monitors in the coil circuits and numerous status signals from the supplies. Placing the microcomputer in an active control role has yielded a compact, cost effective system that simplifies the magnet system operation and has proven to be very reliable. This paper will describe the TMX magnet control sytem and discuss its development

  16. Applying model predictive control to power system frequency control

    OpenAIRE

    Ersdal, AM; Imsland, L; Cecilio, IM; Fabozzi, D; Thornhill, NF

    2013-01-01

    16.07.14 KB Ok to add accepted version to Spiral Model predictive control (MPC) is investigated as a control method which may offer advantages in frequency control of power systems than the control methods applied today, especially in presence of increased renewable energy penetration. The MPC includes constraints on both generation amount and generation rate of change, and it is tested on a one-area system. The proposed MPC is tested against a conventional proportional-integral (PI) cont...

  17. Packaging of control system software

    International Nuclear Information System (INIS)

    Zagar, K.; Kobal, M.; Saje, N.; Zagar, A.; Sabjan, R.; Di Maio, F.; Stepanov, D.

    2012-01-01

    Control system software consists of several parts - the core of the control system, drivers for integration of devices, configuration for user interfaces, alarm system, etc. Once the software is developed and configured, it must be installed to computers where it runs. Usually, it is installed on an operating system whose services it needs, and also in some cases dynamically links with the libraries it provides. Operating system can be quite complex itself - for example, a typical Linux distribution consists of several thousand packages. To manage this complexity, we have decided to rely on Red Hat Package Management system (RPM) to package control system software, and also ensure it is properly installed (i.e., that dependencies are also installed, and that scripts are run after installation if any additional actions need to be performed). As dozens of RPM packages need to be prepared, we are reducing the amount of effort and improving consistency between packages through a Maven-based infrastructure that assists in packaging (e.g., automated generation of RPM SPEC files, including automated identification of dependencies). So far, we have used it to package EPICS, Control System Studio (CSS) and several device drivers. We perform extensive testing on Red Hat Enterprise Linux 5.5, but we have also verified that packaging works on CentOS and Scientific Linux. In this article, we describe in greater detail the systematic system of packaging we are using, and its particular application for the ITER CODAC Core System. (authors)

  18. Acceptance test report: Backup power system

    International Nuclear Information System (INIS)

    Cole, D.B.

    1996-01-01

    Acceptance Test Report for construction functional testing of Project W-030 Backup Power System. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. Backup power includes a single 125 KW diesel generator, three 10-kva uninterruptible power supply units, and all necessary control

  19. Development of the control system of the ALICE Transition Radiation Detector and of a test environment for quality-assurance of its front-end electronics

    CERN Document Server

    Mercado Pérez, Jorge

    2008-01-01

    Within this thesis, the detector control system (DCS) for the Transition Radiation Detector (TRD) of the ALICE experiment at the Large Hadron Collider has been developed. The TRD DCS is fully implemented as a detector oriented hierarchy of objects behaving as finite state machines. It controls and monitors over 65 thousand front-end electronics (FEE) units, a few hundred low voltage and one thousand high voltage channels, and other sub-systems such as cooling and gas. Commissioning of the TRD DCS took place during several runs with ALICE using cosmic events. Another part of this thesis describes the development of a test environment for large-scale production quality-assurance of over 4 thousand FEE read-out boards containing in total about 1.2 million read-out channels. The hardware and software components are described in detail. Additionally, a series of performance studies were carried out earlier including radiation tolerance tests of the TRAP chip which is the core component of the TRD FEE.

  20. Development of the control system of the ALICE transition radiation detector and of a test environment for quality-assurance of its front-end electronics

    International Nuclear Information System (INIS)

    Mercado Perez, Jorge

    2008-01-01

    Within this thesis, the detector control system (DCS) for the Transition Radiation Detector (TRD) of the ALICE experiment at the Large Hadron Collider has been developed. The TRD DCS is fully implemented as a detector oriented hierarchy of objects behaving as finite state machines. It controls and monitors over 65 thousand front-end electronics (FEE) units, a few hundred low voltage and one thousand high voltage channels, and other sub-systems such as cooling and gas. Commissioning of the TRD DCS took place during several runs with ALICE using cosmic events. Another part of this thesis describes the development of a test environment for large-scale production quality-assurance of over 4 thousand FEE read-out boards containing in total about 1.2 million read-out channels. The hardware and software components are described in detail. Additionally, a series of performance studies were carried out earlier including radiation tolerance tests of the TRAP chip which is the core component of the TRD FEE. (orig.)

  1. Development of the control system of the ALICE transition radiation detector and of a test environment for quality-assurance of its front-end electronics

    Energy Technology Data Exchange (ETDEWEB)

    Mercado Perez, Jorge

    2008-11-10

    Within this thesis, the detector control system (DCS) for the Transition Radiation Detector (TRD) of the ALICE experiment at the Large Hadron Collider has been developed. The TRD DCS is fully implemented as a detector oriented hierarchy of objects behaving as finite state machines. It controls and monitors over 65 thousand front-end electronics (FEE) units, a few hundred low voltage and one thousand high voltage channels, and other sub-systems such as cooling and gas. Commissioning of the TRD DCS took place during several runs with ALICE using cosmic events. Another part of this thesis describes the development of a test environment for large-scale production quality-assurance of over 4 thousand FEE read-out boards containing in total about 1.2 million read-out channels. The hardware and software components are described in detail. Additionally, a series of performance studies were carried out earlier including radiation tolerance tests of the TRAP chip which is the core component of the TRD FEE. (orig.)

  2. System control and display

    International Nuclear Information System (INIS)

    Jacobs, J.

    1977-01-01

    The system described was designed, developed, and installed on short time scales and primarily utilized of-the-shelf military and commercial hardware. The system was designed to provide security-in-depth and multiple security options with several stages of redundancy. Under normal operating conditions, the system is computer controlled with manual backup during abnormal conditions. Sensor alarm data are processed in conjunction with weather data to reduce nuisance alarms. A structured approach is used to order alarmed sectors for assessment. Alarm and video information is presented to security personnel in an interactive mode. Historical operational data are recorded for system evaluation

  3. Ion implantation control system

    International Nuclear Information System (INIS)

    Gault, R. B.; Keutzer, L. L.

    1985-01-01

    A control system is disclosed for an ion implantation system of the type in which the wafers to be implanted are mounted around the periphery of a disk which rotates and also moves in a radial direction relative to an ion beam to expose successive sections of each wafer to the radiation. The control system senses beam current which passes through one or more apertures in the disk and is collected by a Faraday cup. This current is integrated to obtain a measure of charge which is compared with a calculated value based upon the desired ion dosage and other parameters. The resultant controls the number of incremental steps the rotating disk moves radially to expose the adjacent sections of each wafer. This process is continued usually with two or more traverses until the entire surface of each wafer has been implanted with the proper ion dosage

  4. Integration of Fire Control, Flight Control and Propulsion Control Systems.

    Science.gov (United States)

    1983-08-01

    pourront etre enploy6s. Avant l’attaque, des profils de vole contr~lant I’Anergie seront 6tablis pour augmenter au maximum l’dnergie disponible do...VERIIATION PROCEDURES NTRTO PERFORM CONTROL SYSTEM REPEAT TESTS WITH ACTUAL ENGIRE ITEATO INTEGRATION TO TIENMO. RUUINED TE VALIDATE TESTING TESI ...fonrtionnement est disponible . Teat-dea rodur d’nrf /sortie .an. scs i lquiesent posslde ce* deux dispositife, on test des rodeurs et sx~fiutA *Sur une vote do

  5. Preoperational test report, recirculation ventilation systems

    International Nuclear Information System (INIS)

    Clifton, F.T.

    1997-01-01

    This represents a preoperational test report for Recirculation Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides vapor space cooling of tanks AY1O1, AY102, AZ1O1, AZ102 and supports the ability to exhaust air from each tank. Each system consists of a valved piping loop, a fan, condenser, and moisture separator; equipment is located inside each respective tank farm in its own hardened building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System

  6. Preoperational test report, recirculation ventilation systems

    Energy Technology Data Exchange (ETDEWEB)

    Clifton, F.T.

    1997-11-11

    This represents a preoperational test report for Recirculation Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides vapor space cooling of tanks AY1O1, AY102, AZ1O1, AZ102 and supports the ability to exhaust air from each tank. Each system consists of a valved piping loop, a fan, condenser, and moisture separator; equipment is located inside each respective tank farm in its own hardened building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

  7. The TRISTAN control system

    International Nuclear Information System (INIS)

    Kurokawa, Shinichi; Akiyama, Atsuyoshi; Ishii, Kazuhiro; Kadokura, Eiichi; Katoh, Tadahiko; Kawamoto, Takashi; Kikutani, Eiji; Kimura, Yoshitaka; Koiso, Haruyo; Komada, Ichitaka; Kudo, Kikuo; Naito, Takashi; Oide, Katsunobu; Takeda, Shigeru; Uchino, Kenji; Urakawa, Junji; Shinomoto, Manabu; Kurihara, Michio; Abe, Kenichi

    1986-01-01

    The 8 GeV accumulation ring and the 30 GeV main ring of TRISTAN, an accelerator-storage ring complex at KEK, are controlled by a highly computerized control system. Twenty-four minicomputers are linked by optical fiber cables to form an N-to-N token ring network. The transmission speed on the cables is 10 Mbps. From each minicomputer, a CAMAC serial highway extends to the controlled equipment. At present, twenty minicomputers are connected to the network and are used to control the accumulation ring. The software system is based on the NODAL language devised at the CERN SPS. The KEK NODAL system retains main features of the original NODAL: the interpretive scheme, the multi-computer programming facility, and the data-module concept. In addition, it has the following features: (1) fast execution due to the compiler-interpreter method, (2) a multi-computer file system (3), a full-screen editing facility, and (4) a dynamic linkage scheme for data modules and NODAL functions. The accelerators are operated through five operator consoles, each of which is mangaged by one minicomputer in the network. An operator console contains two 20-inch high-resolution color graphic displays, a pair of touch-panels, and ten small TV monitors. One touch-panel is used to select a program and a piece of equipment to be controlled; the other is used mainly to perform the console actions. (orig.)

  8. neural control system

    International Nuclear Information System (INIS)

    Elshazly, A.A.E.

    2002-01-01

    Automatic power stabilization control is the desired objective for any reactor operation , especially, nuclear power plants. A major problem in this area is inevitable gap between a real plant ant the theory of conventional analysis and the synthesis of linear time invariant systems. in particular, the trajectory tracking control of a nonlinear plant is a class of problems in which the classical linear transfer function methods break down because no transfer function can represent the system over the entire operating region . there is a considerable amount of research on the model-inverse approach using feedback linearization technique. however, this method requires a prices plant model to implement the exact linearizing feedback, for nuclear reactor systems, this approach is not an easy task because of the uncertainty in the plant parameters and un-measurable state variables . therefore, artificial neural network (ANN) is used either in self-tuning control or in improving the conventional rule-based exper system.the main objective of this thesis is to suggest an ANN, based self-learning controller structure . this method is capable of on-line reinforcement learning and control for a nuclear reactor with a totally unknown dynamics model. previously, researches are based on back- propagation algorithm . back -propagation (BP), fast back -propagation (FBP), and levenberg-marquardt (LM), algorithms are discussed and compared for reinforcement learning. it is found that, LM algorithm is quite superior

  9. Fuzzy logic for structural system control

    Directory of Open Access Journals (Sweden)

    Herbert Martins Gomes

    Full Text Available This paper provides some information and numerical tests that aims to investigate the use of a Fuzzy Controller applied to control systems. Some advantages are reported regarding the use of this controller, such as the characteristic ease of implementation due to its semantic feature in the statement of the control rules. On the other hand, it is also hypothesized that these systems have a lower performance loss when the system to be controlled is nonlinear or has time varying parameters. Numerical tests are performed using modal LQR optimal control and Fuzzy control of non-collocated systems with full state feedback in a two-dimensional structure. The paper proposes a way of designing a controller that may be a supervisory Fuzzy controller for a traditional controller or even a fuzzy controller independent from the traditional control, consisting on individual mode controllers. Some comments are drawn regarding the performance of these proposals in a number of arrangements.

  10. RHIC control system

    Energy Technology Data Exchange (ETDEWEB)

    Barton, D.S. E-mail: dsbarton@bnl.gov; Binello, S.; Buxton, W.; Clifford, T.; D' Ottavio, T.; Hartmann, H.; Hoff, L.T.; Katz, R.; Kennell, S.; Kerner, T.; Laster, J.; Lee, R.C.; Marusic, A.; Michnoff, R.; Morris, J.; Oerter, B.R.; Olsen, R.; Piacentino, J.; Skelly, J.F

    2003-03-01

    The RHIC control system architecture is hierarchical and consists of two physical layers with a fiber-optic network connection. The Front-End Level systems consist of VME chassis with processors running a real-time operating system and both VME I/O modules and remote bus interfaces. Accelerator device software interfaces are implemented as objects in C++. The network implementation uses high speed, switched Ethernet technology. Specialized hardware modules were built for waveform control of power supplies, multiplexed signal acquisition, and timing services. The Console Level systems are Unix workstations. A strong emphasis has been given to developing highly reusable, standard software tools for use in building physics and diagnostic application software.

  11. RHIC control system

    International Nuclear Information System (INIS)

    Barton, D.S.; Binello, S.; Buxton, W.; Clifford, T.; D'Ottavio, T.; Hartmann, H.; Hoff, L.T.; Katz, R.; Kennell, S.; Kerner, T.; Laster, J.; Lee, R.C.; Marusic, A.; Michnoff, R.; Morris, J.; Oerter, B.R.; Olsen, R.; Piacentino, J.; Skelly, J.F.

    2003-01-01

    The RHIC control system architecture is hierarchical and consists of two physical layers with a fiber-optic network connection. The Front-End Level systems consist of VME chassis with processors running a real-time operating system and both VME I/O modules and remote bus interfaces. Accelerator device software interfaces are implemented as objects in C++. The network implementation uses high speed, switched Ethernet technology. Specialized hardware modules were built for waveform control of power supplies, multiplexed signal acquisition, and timing services. The Console Level systems are Unix workstations. A strong emphasis has been given to developing highly reusable, standard software tools for use in building physics and diagnostic application software

  12. ZEUS hardware control system

    Science.gov (United States)

    Loveless, R.; Erhard, P.; Ficenec, J.; Gather, K.; Heath, G.; Iacovacci, M.; Kehres, J.; Mobayyen, M.; Notz, D.; Orr, R.; Orr, R.; Sephton, A.; Stroili, R.; Tokushuku, K.; Vogel, W.; Whitmore, J.; Wiggers, L.

    1989-12-01

    The ZEUS collaboration is building a system to monitor, control and document the hardware of the ZEUS detector. This system is based on a network of VAX computers and microprocessors connected via ethernet. The database for the hardware values will be ADAMO tables; the ethernet connection will be DECNET, TCP/IP, or RPC. Most of the documentation will also be kept in ADAMO tables for easy access by users.

  13. ZEUS hardware control system

    International Nuclear Information System (INIS)

    Loveless, R.; Erhard, P.; Ficenec, J.; Gather, K.; Heath, G.; Iacovacci, M.; Kehres, J.; Mobayyen, M.; Notz, D.; Orr, R.; Sephton, A.; Stroili, R.; Tokushuku, K.; Vogel, W.; Whitmore, J.; Wiggers, L.

    1989-01-01

    The ZEUS collaboration is building a system to monitor, control and document the hardware of the ZEUS detector. This system is based on a network of VAX computers and microprocessors connected via ethernet. The database for the hardware values will be ADAMO tables; the ethernet connection will be DECNET, TCP/IP, or RPC. Most of the documentation will also be kept in ADAMO tables for easy access by users. (orig.)

  14. Development of a system for monitoring and diagnosis using Fuzzy logic in control valves of laboratory test equipment of Experimental Center Aramar

    International Nuclear Information System (INIS)

    Porto Junior, Almir Carlos Soares

    2014-01-01

    The question of components reliability, specifically process control valves, has become an important issue to be investigated in nuclear power plants and other areas such as refinery or offshore oil rig, considering the safety and life extension of the plant. The development of non intrusive monitoring and diagnostic method allows the identification of defects in components of the plant during normal operation. The objective of this dissertation is to present an analysis and diagnosis of control valves of a steam plant part that simulates the secondary circuit of a pressurized water reactor. This installation is part of propulsion equipment testing laboratory of the Brazilian Navy, at Ipero-SP. The methodology for design is based on graphical analysis of two parameters, the valve air pressure actuator and the displacement of the valve plug. These data are extracted by a smart positioner, part of Delta V™ Automation System. An analysis is implemented in detecting anomalies by an approach using Expert Systems by the technique of fuzzy logic. Once the basic measures of control valves are taken, it is possible to detect symptoms of failure, leakage, friction, damage, etc. The monitoring and diagnostic system has been designed in MATLAB® version 2009 th by the complement 'Fuzzy Logic Toolbox'. It is a noninvasive technique. Thus, it is possible to know what is happening with the chosen components, just analyzing the parameters of the valve. The software called ValveLink® (developed by Emerson) receives signals from hardware component (intelligent positioner) installed next to the control valve. These signals (electrical current) are transformed into information which are used input parameters: air pressure valve actuator and valve plug displacement. With the use of fuzzy logic, these parameters are interpreted. They suffer inferences by rules written by experts in valves. After these inferences, the information is processed and sent as output signals

  15. Control of complex systems

    CERN Document Server

    Albertos, Pedro; Blanke, Mogens; Isidori, Alberto; Schaufelberger, Walter; Sanz, Ricardo

    2001-01-01

    The world of artificial systems is reaching complexity levels that es­ cape human understanding. Surface traffic, electricity distribution, air­ planes, mobile communications, etc. , are examples that demonstrate that we are running into problems that are beyond classical scientific or engi­ neering knowledge. There is an ongoing world-wide effort to understand these systems and develop models that can capture its behavior. The reason for this work is clear, if our lack of understanding deepens, we will lose our capability to control these systems and make they behave as we want. Researchers from many different fields are trying to understand and develop theories for complex man-made systems. This book presents re­ search from the perspective of control and systems theory. The book has grown out of activities in the research program Control of Complex Systems (COSY). The program has been sponsored by the Eu­ ropean Science Foundation (ESF) which for 25 years has been one of the leading players in stimula...

  16. Development of autonomous vehicles’ testing system

    Science.gov (United States)

    Ivanov, A. M.; Shadrin, S. S.

    2018-02-01

    This article describes overview of automated and, in perspective, autonomous vehicles’ (AV) implementation risks. Set of activities, actual before the use of AVs on public roads, minimizing negative technical and social problems of AVs’ implementation is presented. Classification of vehicle’s automated control systems operating conditions is formulated. Groups of tests for AVs are developed and justified, sequence of AVs’ testing system formation is proposed.

  17. 10 CFR 71.123 - Test control.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Test control. 71.123 Section 71.123 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PACKAGING AND TRANSPORTATION OF RADIOACTIVE MATERIAL Quality Assurance § 71.123 Test control. The licensee, certificate holder, and applicant for a CoC shall establish a test...

  18. Distributed control system for the FMIT

    International Nuclear Information System (INIS)

    Johnson, J.A.; Machen, D.R.; Suyama, R.M.

    1979-01-01

    The control system for the Fusion Materials Irradiation Test (FMIT) Facility will provide the primary data acquisition, control, and interface components that integrate all of the individual FMIT systems into a functional facility. The control system consists of a distributed computer network, control consoles and instrumentation subsystems. The FMIT Facility will be started, operated and secured from a Central Control Room. All FMIT systems and experimental functions will be monitored from the Central Control Room. The data acquisition and control signals will be handled by a data communications network, which connects dual computers in the Central Control Room to the microcomputers in CAMAC crates near the various subsystems of the facility

  19. HESYRL control system status

    International Nuclear Information System (INIS)

    Yao Chihyuan

    1992-01-01

    HESYRL synchrotron radiation storage ring was completed in 1989 and has been in commissioning since then. Now it has met its design specification and is ready for synchrotron light experiments. Control system of the project was completed in 1989 and some modifications were made during commissioning. This paper describes its present configuration, status and upgrading plan. (author)

  20. Fault Tolerant Control Systems

    DEFF Research Database (Denmark)

    Bøgh, S. A.

    This thesis considered the development of fault tolerant control systems. The focus was on the category of automated processes that do not necessarily comprise a high number of identical sensors and actuators to maintain safe operation, but still have a potential for improving immunity to component...

  1. Lighting Control Systems Handbook.

    Science.gov (United States)

    1985-06-01

    cost, both initial and operating. Initially, the control system designer must collect in- formation and then study and weigh several areas including...8217odLe 045. Pearl Harbor. III: Code 11 Pearl Harbor ar ho I ir I L ’ odk 402. R IYI& [’. Plearl II arbor I II: Li bra ry. Pearl HaIitrbor. I ai

  2. Internet Congestion Control System

    Directory of Open Access Journals (Sweden)

    Pranoto Rusmin

    2010-10-01

    Full Text Available Internet congestion occurs when resource demands exceeds the network capacity. But, it is not the only reason. Congestion can happen on some users because some others user has higher sending rate. Then some users with lower sending rate will experience congestion. This partial congestion is caused by inexactly feedback. At this moment congestion are solved by the involvement of two controlling mechanisms. These mechanisms are flow/congestion control in the TCP source and Active Queue Management (AQM in the router. AQM will provide feedback to the source a kind of indication for the occurrence of the congestion in the router, whereas the source will adapt the sending rate appropriate with the feedback. These mechanisms are not enough to solve internet congestion problem completely. Therefore, this paper will explain internet congestion causes, weakness, and congestion control technique that researchers have been developed. To describe congestion system mechanisms and responses, the system will be simulated by Matlab.

  3. Space Fission System Test Effectiveness

    International Nuclear Information System (INIS)

    Houts, Mike; Schmidt, Glen L.; Van Dyke, Melissa; Godfroy, Tom; Martin, James; Bragg-Sitton, Shannon; Dickens, Ricky; Salvail, Pat; Harper, Roger

    2004-01-01

    Space fission technology has the potential to enable rapid access to any point in the solar system. If fission propulsion systems are to be developed to their full potential, however, near-term customers need to be identified and initial fission systems successfully developed, launched, and utilized. One key to successful utilization is to develop reactor designs that are highly testable. Testable reactor designs have a much higher probability of being successfully converted from paper concepts to working space hardware than do designs which are difficult or impossible to realistically test. ''Test Effectiveness'' is one measure of the ability to realistically test a space reactor system. The objective of this paper is to discuss test effectiveness as applied to the design, development, flight qualification, and acceptance testing of space fission systems. The ability to perform highly effective testing would be particularly important to the success of any near-term mission, such as NASA's Jupiter Icy Moons Orbiter, the first mission under study within NASA's Project Prometheus, the Nuclear Systems Program

  4. Cascade Distiller System Performance Testing Interim Results

    Science.gov (United States)

    Callahan, Michael R.; Pensinger, Stuart; Sargusingh, Miriam J.

    2014-01-01

    The Cascade Distillation System (CDS) is a rotary distillation system with potential for greater reliability and lower energy costs than existing distillation systems. Based upon the results of the 2009 distillation comparison test (DCT) and recommendations of the expert panel, the Advanced Exploration Systems (AES) Water Recovery Project (WRP) project advanced the technology by increasing reliability of the system through redesign of bearing assemblies and improved rotor dynamics. In addition, the project improved the CDS power efficiency by optimizing the thermoelectric heat pump (TeHP) and heat exchanger design. Testing at the NASA-JSC Advanced Exploration System Water Laboratory (AES Water Lab) using a prototype Cascade Distillation Subsystem (CDS) wastewater processor (Honeywell d International, Torrance, Calif.) with test support equipment and control system developed by Johnson Space Center was performed to evaluate performance of the system with the upgrades as compared to previous system performance. The system was challenged with Solution 1 from the NASA Exploration Life Support (ELS) distillation comparison testing performed in 2009. Solution 1 consisted of a mixed stream containing human-generated urine and humidity condensate. A secondary objective of this testing is to evaluate the performance of the CDS as compared to the state of the art Distillation Assembly (DA) used in the ISS Urine Processor Assembly (UPA). This was done by challenging the system with ISS analog waste streams. This paper details the results of the AES WRP CDS performance testing.

  5. C-106 tank sluicer control system

    International Nuclear Information System (INIS)

    Bellomy, J.R.

    1997-01-01

    Acceptance Test Report for the Sluicer Control System, Project W-320 This Acceptance Test Procedure (ATP) has been prepared to demonstrate that the C-Farm tank C-106 sluicer functions as required by the design criteria

  6. PEP computer control system

    International Nuclear Information System (INIS)

    1979-03-01

    This paper describes the design and performance of the computer system that will be used to control and monitor the PEP storage ring. Since the design is essentially complete and much of the system is operational, the system is described as it is expected to 1979. Section 1 of the paper describes the system hardware which includes the computer network, the CAMAC data I/O system, and the operator control consoles. Section 2 describes a collection of routines that provide general services to applications programs. These services include a graphics package, data base and data I/O programs, and a director programm for use in operator communication. Section 3 describes a collection of automatic and semi-automatic control programs, known as SCORE, that contain mathematical models of the ring lattice and are used to determine in real-time stable paths for changing beam configuration and energy and for orbit correction. Section 4 describes a collection of programs, known as CALI, that are used for calibration of ring elements

  7. The ISOLDE control system

    International Nuclear Information System (INIS)

    Deloose, I.; Pace, A.

    1994-01-01

    The two CERN isotope separators named ISOLDE have been running on the new Personal Computer (PC) based control system since April 1992. The new architecture that makes heavy use of the commercial software and hardware of the PC market has been implemented on the 1700 geographically distributed control channels of the two separators and their experimental area. Eleven MSDOS Intel-based PCs with approximately 80 acquisition and control boards are used to access the equipment and are controlled from three PCs running Microsoft Windows used as consoles through a Novell Local Area Network. This paper describes the interesting solutions found and discusses the reduced programming workload and costs that have been obtained. ((orig.))

  8. Advanced WEC Dynamics & Controls FY16 Testing Report

    Energy Technology Data Exchange (ETDEWEB)

    Coe, Ryan Geoffrey [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bacelli, Giorgio [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Wilson, David G. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Patterson, David Charles [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-10-01

    A model-scale wave tank test was conducted in the interest of improving control systems design of wave energy converters (WECs). The success of most control strategies is based directly upon the availability of a reduced-order model with the ability to capture the dynamics of the system with sufficient accuracy. For this reason, the test described in this report, which is the first in a series of planned tests on WEC controls, focused on system identification (system ID) and model validation.

  9. Microprocessor-controlled surface testing

    Energy Technology Data Exchange (ETDEWEB)

    Droscha, H

    1982-09-01

    For the quality inspection on continuous flow material webs with transverse scanning laser beam, the microprocessor control, realized now for the first time in combination with appropriate units, shows a considerable progress. Thanks to the here used electronics, surface errors can be localized within the web according to their x-y-position, quantitative analysis can be carried out and automatic sorting and registration functions can be used.

  10. Availability of periodically tested systems

    International Nuclear Information System (INIS)

    Signoret, J.P.

    1979-01-01

    There is at the present time a need in accurate models to asess the availability of periodically tested stand-by systems. This paper shows how to improve the well known 'saw-tooth curve' model in order to take into account various reliability parameters. A model is developed to assess the pointwise and the mean availabilities of periodically tested stand-by systems. Exact and approxination formulae are given. In addition, the model developed herein leads to optimize the test interval in order to minimize the mean unavailability. A safety diesel in a nuclear power plant is given as an example

  11. Preoperational test report, raw water system

    Energy Technology Data Exchange (ETDEWEB)

    Clifton, F.T.

    1997-10-29

    This represents the preoperational test report for the Raw Water System, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system supplies makeup water to the W-030 recirculation evaporative cooling towers for tanks AY1O1, AY102, AZ1O1, AZ102. The Raw Water pipe riser and associated strainer and valving is located in the W-030 diesel generator building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System.

  12. Preoperational test report, raw water system

    International Nuclear Information System (INIS)

    Clifton, F.T.

    1997-01-01

    This represents the preoperational test report for the Raw Water System, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system supplies makeup water to the W-030 recirculation evaporative cooling towers for tanks AY1O1, AY102, AZ1O1, AZ102. The Raw Water pipe riser and associated strainer and valving is located in the W-030 diesel generator building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System

  13. Dosimetric quality control of treatment planning systems in external radiation therapy using Digital Test Objects calculated by PENELOPE Monte-Carlo simulations

    International Nuclear Information System (INIS)

    Ben Hdech, Yassine

    2011-01-01

    To ensure the required accuracy and prevent from mis-administration, cancer treatments, by external radiation therapy are simulated on Treatment Planning System or TPS before radiation delivery in order to ensure that the prescription is achieved both in terms of target volumes coverage and healthy tissues protection. The TPS calculates the patient dose distribution and the treatment time per beam required to deliver the prescribed dose. TPS is a key system in the decision process of treatment by radiation therapy. It is therefore essential that the TPS be subject to a thorough check of its performance (quality control or QC) and in particular its ability to accurately compute dose distributions for patients in all clinical situations that be met. The 'traditional' methods recommended to carry out dosimetric CQ of algorithms implemented in the TPS are based on comparisons between dose distributions calculated with the TPS and dose measured in physical test objects (PTO) using the treatment machine. In this thesis we propose to substitute the reference dosimetric measurements performed in OTP by benchmark dose calculations in Digital Test Objects using PENELOPE Monte-Carlo code. This method has three advantages: (i) it allows simulation in situations close to the clinic and often too complex to be experimentally feasible; (ii) due to the digital form of reference data the QC process may be automated; (iii) it allows a comprehensive TPS CQ without hindering the use of an equipment devoted primarily to patients treatments. This new method of CQ has been tested successfully on the Eclipse TPS from Varian Medical Systems Company. (author) [fr

  14. Dynamitron control systems

    International Nuclear Information System (INIS)

    Lisanti, Thomas F.

    2005-01-01

    The Dynamitron control system utilizes the latest personal computer technology in control circuitry and components. Both the DPC-2000 and newer Millennium series of control systems make use of their modular architecture in both software and hardware to keep up with customer and engineering demands. This also allows the main structure of the software to remain constant for the user while software drivers are easily changed as hardware demands are modified and improved. The system is presented as four units; the Remote I/O (Input/Output), Local Analog and Digital I/O, Operator Interface and the Main Computer. The operator is provided with a selection of many informative screen displays. The control program handles all graphic screen displays and the updating of these screens directly; it does not communicate to a display terminal. This adds to the quick response and excellent operator feedback received while operating the accelerator. The CPU also has the ability to store and record all process variable setpoints for each product that will be treated. All process parameters are printed to a report at regular intervals during a process run for record keeping

  15. Wireless Remote Control System

    Directory of Open Access Journals (Sweden)

    Adrian Tigauan

    2012-06-01

    Full Text Available This paper presents the design of a wireless remote control system based on the ZigBee communication protocol. Gathering data from sensors or performing control tasks through wireless communication is advantageous in situations in which the use of cables is impractical. An Atmega328 microcontroller (from slave device is used for gathering data from the sensors and transmitting it to a coordinator device with the help of the XBee modules. The ZigBee standard is suitable for low-cost, low-data-rate and low-power wireless networks implementations. The XBee-PRO module, designed to meet ZigBee standards, requires minimal power for reliable data exchange between devices over a distance of up to 1600m outdoors. A key component of the ZigBee protocol is the ability to support networking and this can be used in a wireless remote control system. This system may be employed e.g. to control temperature and humidity (SHT11 sensor and light intensity (TSL230 sensor levels inside a commercial greenhouse.

  16. Management control system description

    Energy Technology Data Exchange (ETDEWEB)

    Bence, P. J.

    1990-10-01

    This Management Control System (MCS) description describes the processes used to manage the cost and schedule of work performed by Westinghouse Hanford Company (Westinghouse Hanford) for the US Department of Energy, Richland Operations Office (DOE-RL), Richland, Washington. Westinghouse Hanford will maintain and use formal cost and schedule management control systems, as presented in this document, in performing work for the DOE-RL. This MCS description is a controlled document and will be modified or updated as required. This document must be approved by the DOE-RL; thereafter, any significant change will require DOE-RL concurrence. Westinghouse Hanford is the DOE-RL operations and engineering contractor at the Hanford Site. Activities associated with this contract (DE-AC06-87RL10930) include operating existing plant facilities, managing defined projects and programs, and planning future enhancements. This document is designed to comply with Section I-13 of the contract by providing a description of Westinghouse Hanford's cost and schedule control systems used in managing the above activities. 5 refs., 22 figs., 1 tab.

  17. Data Organization for Quality Control Test

    International Nuclear Information System (INIS)

    Yahaya Talib; Glam Hadzir Patai Mohamad; Wan Hamirul Bahrin Wan Kamal

    2011-01-01

    Test data and results for quality control of Mo-99/ Tc-99m generator shall be organized properly. A computer program was developed using Visual Basic 6.0 to process test data, store data and results to specific folder, generate test reports and certificates. Its performance has been evaluated and tested. (author)

  18. Access control system operation

    International Nuclear Information System (INIS)

    Barnes, L.D.

    1981-06-01

    An automated method for the control and monitoring of personnel movement throughout the site was developed under contract to the Department of Energy by Allied-General Nuclear Services (AGNS) at the Barnwell Nuclear Fuel Plant (BNFP). These automated features provide strict enforcement of personnel access policy without routine patrol officer involvement. Identification methods include identification by employee ID number, identification by voice verification and identification by physical security officer verification. The ability to grant each level of access authority is distributed over the organization to prevent any single individual at any level in the organization from being capable of issuing an authorization for entry into sensitive areas. Each access event is recorded. As access events occur, the inventory of both the entered and the exited control area is updated so that a current inventory is always available for display. The system has been operated since 1979 in a development mode and many revisions have been implemented in hardware and software as areas were added to the system. Recent changes have involved the installation of backup systems and other features required to achieve a high reliability. The access control system and recent operating experience are described

  19. TEST REPORT OF MOBILE SOURCE EMISSIONS CONTROL DEVICES DONALDSON COMPANY INC.SERIES 6000 DISEL OXIDATION CATALYST MUFFLER AND SPIRACLE CLOSED CRANKCASE FILTRATION SYSTEM

    Science.gov (United States)

    This report is on testing of a Donaldson Corp. catalytic muffler and closed crankcase filtration system for diesel trucks. It verified the emissions for these systems using low sufur and ultra low sulfur fuel.

  20. The COSY control system

    International Nuclear Information System (INIS)

    Bongers, N.; Hacker, U.; Henn, K.; Richert, A.; Simon, M.; Sobotta, K.; Stephan, M.; Vashegyi, T.; Weinert, A.

    1992-01-01

    The COSY control system architecture is organized strongly hierarchically with distributed intelligence and extensive use of standards. At the top level of computer control hardware work stations give the operator graphical access to the process. For these tasks Hewlett Packard HP 9000 Series 700 computers with HP-UX and X-Windows/Motif are in use. Also used as work-cells this RISC computers give computing power for model calculations and long term databases. This computers are interconnected using Ethernet and TCP/IP to the next layer of hardware. (author) 3 refs.; 5 figs

  1. Flight Test Approach to Adaptive Control Research

    Science.gov (United States)

    Pavlock, Kate Maureen; Less, James L.; Larson, David Nils

    2011-01-01

    The National Aeronautics and Space Administration s Dryden Flight Research Center completed flight testing of adaptive controls research on a full-scale F-18 testbed. The validation of adaptive controls has the potential to enhance safety in the presence of adverse conditions such as structural damage or control surface failures. This paper describes the research interface architecture, risk mitigations, flight test approach and lessons learned of adaptive controls research.

  2. Development and testing of control rod drives for ship reactors

    International Nuclear Information System (INIS)

    Bruelheide, K.; Mundt, D.; Peters, C.-H.; Manthey, H.-J.

    1978-01-01

    The following paper deals with the development and testings of a new control rod drive design for marine reactors. Starting from the good operating experience with the advanced pressurized water reactor (FDR) of the NS OTTO HAHN a control rod drive system with an hermetically sealed drive principle was developed. A prototype control rod drive system was put through extensive tests and developed ready for standard production at the 'Gesellschaft fuer Kernenergieverwertung in Schiffbau und Schiffahrt'

  3. Microbiological Tests Performed During the Design of the International Space Station Environmental Control and Life Support Systems. Part 1, Bulk Phase. Part 1; Bulk Phase

    Science.gov (United States)

    Roman, Monsi C.; Mittelman, Marc W.

    2010-01-01

    The design and manufacturing of the main Environmental Control and Life Support Systems (ECLSS) for the United States segments of the International Space Station (ISS) was an involved process that started in the mid 1980s, with the assessment and testing of competing technologies that could be used to clean the air and recycle water. It culminated in 2009 with the delivery and successful activation of the Water Recovery System (WRS) water processor (WP). The ECLSS required the work of a team of engineers and scientist working together to develop systems that could clean and/or recycle human metabolic loads to maintain a clean atmosphere and provide the crew clean water. One of the main goals of the ECLSS is to minimize the time spent by the crew worrying about vital resources not available in the vacuum of space, which allows them to spend most of their time learning to live in a microgravity environment many miles from the comforts of Earth and working on science experiments. Microorganisms are a significant part of the human body as well as part of the environment that we live in. Therefore, the ISS ECLSS design had to take into account the effect microorganisms have on the quality of stored water and wastewater, as well as that of the air systems. Hardware performance issues impacted by the accumulation of biofilm and/or microbiologically influenced corrosion were also studied during the ECLSS development stages. Many of the tests that were performed had to take into account the unique aspects of a microgravity environment as well as the challenge of understanding how to design systems that could not be sterilized or maintained in a sterile state. This paper will summarize the work of several studies that were performed to assess the impacts and/or to minimize the effects of microorganisms in open, semi-closed and closed loop life support system. The biofilm and biodeterioration studies that were performed during the design and test periods will be presented in

  4. Neutron flux control systems validation

    International Nuclear Information System (INIS)

    Hascik, R.

    2003-01-01

    In nuclear installations main requirement is to obtain corresponding nuclear safety in all operation conditions. From the nuclear safety point of view is commissioning and start-up after reactor refuelling appropriate period for safety systems verification. In this paper, methodology, performance and results of neutron flux measurements systems validation is presented. Standard neutron flux measuring chains incorporated into the reactor protection and control system are used. Standard neutron flux measuring chain contains detector, preamplifier, wiring to data acquisition unit, data acquisition unit, wiring to display at control room and display at control room. During reactor outage only data acquisition unit and wiring and displaying at reactor control room is verified. It is impossible to verify detector, preamplifier and wiring to data acquisition recording unit during reactor refuelling according to low power. Adjustment and accurate functionality of these chains is confirmed by start-up rate (SUR) measurement during start-up tests after refuelling of the reactors. This measurement has direct impact to nuclear safety and increase operational nuclear safety level. Briefly description of each measuring system is given. Results are illustrated on measurements performed at Bohunice NPP during reactor start-up tests. Main failures and their elimination are described (Authors)

  5. Standardization of penetrating radiation testing system

    International Nuclear Information System (INIS)

    Wiley, P.A.; Aronson, H.L.

    1979-01-01

    Standardization is provided to control system gain of a penetrating radiation testing system by periodically inspecting a reference object in the same manner as the product samples so as to generate a stabilization signal which is compared to a reference signal. The difference, if any, between the stabilization signal and the reference signal is integrated and the integrated signal is used to correct the gain of the system

  6. The UNK control system

    International Nuclear Information System (INIS)

    Alferov, V.N.; Brook, V.L.; Dunaitsev, A.F.

    1992-01-01

    The IHEP proton Accelerating and Storage Complex (UNK) includes in its first stage a 400 GeV conventional and a 3000 GeV superconducting ring placed in the same underground tunnel of 20.7 km circumference. The beam will be injected into UNK from the existing 70 GeV accelerator U-70. The experimental programme which is planned to start in 1995, will include 3000 GeV fixed target and 400 + 3000 GeV colliding beams physics. The size and complexity of the UNK dictate a distributed multiprocessor architecture of the control system. About 4000 of 8/16 bit controllers, directly attached to the UNK equipment will perform low level control and data acquisition tasks. The equipment controllers will be connected via the MIL-1553 field bus to VME based 32-bit front end computers. The TCP/IP network will interconnect front end computers in the UNK equipment buildings with UNIX workstations and servers in the Main Control Room. The report presents the general architecture and current status of the UNK control. (author)

  7. Testing Digital Electronic Protection Systems

    CERN Document Server

    Gabourin, S

    2011-01-01

    This paper outlines the core concepts and realisation of the Safe Machine Parameters Controller (SMPC) testbench, based on a VME crate and LabVIEW program. Its main goal is to ensure the correct function of the SMPC for the protection of the CERN accelerator complex. To achieve this, the tester has been built to replicate the machine environment and operation, in order to ensure that the chassis under test is completely exercised. The complexity of the task increases with the number of input combinations. This paper also outlines the benefits and weaknesses of developing a test suite independently of the hardware being tested, using the “V” approach.

  8. Issues and Feasibility Demonstration of Positioning Closed Loop Control for the CLIC Supporting System Using a Test Mock-up with Five Degrees of Freedom

    CERN Document Server

    Sosin, M; Chritin, N; Griffet, S; Kemppinen, J; Mainaud Durand, H; Rude, V; Sterbini, G

    2012-01-01

    Since several years, CERN is studying the feasibility of building a high energy e+ e- linear collider: the CLIC (Compact LInear Collider). One of the challenges of such a collider is the pre-alignment precision and accuracy requirement on the transverse positions of the linac components, which is typically 14 μm over a window of 200 m. To ensure the possibility of positioning within such tight constraints, CERN Beams Department’s Survey team has worked intensively at developing the methods and technology needed to achieve that objective. This paper describes activities which were performed on a test bench (mock-up) with five degrees of freedom (DOF) for the qualification of control algorithms for the CLIC supporting system active-pre-alignment. Present understanding, lessons learned (“know how”), issues of sensors noise and mechanical components nonlinearities are presented.

  9. Testing jumps via false discovery rate control.

    Science.gov (United States)

    Yen, Yu-Min

    2013-01-01

    Many recently developed nonparametric jump tests can be viewed as multiple hypothesis testing problems. For such multiple hypothesis tests, it is well known that controlling type I error often makes a large proportion of erroneous rejections, and such situation becomes even worse when the jump occurrence is a rare event. To obtain more reliable results, we aim to control the false discovery rate (FDR), an efficient compound error measure for erroneous rejections in multiple testing problems. We perform the test via the Barndorff-Nielsen and Shephard (BNS) test statistic, and control the FDR with the Benjamini and Hochberg (BH) procedure. We provide asymptotic results for the FDR control. From simulations, we examine relevant theoretical results and demonstrate the advantages of controlling the FDR. The hybrid approach is then applied to empirical analysis on two benchmark stock indices with high frequency data.

  10. Testing jumps via false discovery rate control.

    Directory of Open Access Journals (Sweden)

    Yu-Min Yen

    Full Text Available Many recently developed nonparametric jump tests can be viewed as multiple hypothesis testing problems. For such multiple hypothesis tests, it is well known that controlling type I error often makes a large proportion of erroneous rejections, and such situation becomes even worse when the jump occurrence is a rare event. To obtain more reliable results, we aim to control the false discovery rate (FDR, an efficient compound error measure for erroneous rejections in multiple testing problems. We perform the test via the Barndorff-Nielsen and Shephard (BNS test statistic, and control the FDR with the Benjamini and Hochberg (BH procedure. We provide asymptotic results for the FDR control. From simulations, we examine relevant theoretical results and demonstrate the advantages of controlling the FDR. The hybrid approach is then applied to empirical analysis on two benchmark stock indices with high frequency data.

  11. Automatic heating control system

    Energy Technology Data Exchange (ETDEWEB)

    Whittle, A.J.

    1989-11-15

    A heating control system for buildings comprises at least one heater incorporating heat storage means, a first sensor for detecting temperature within the building, means for setting a demand temperature, a second sensor for detecting outside temperature, a timer, and means for determining the switch on time of the heat storage means on the basis of the demand temperature and the internal and external temperatures. The system may additionally base the switch on time of the storage heater(s) on the heating and cooling rates of the building (as determined from the sensed temperatures); or on the anticipated daytime temperature (determined from the sensed night time temperature). (author).

  12. Stepping-Motion Motor-Control Subsystem For Testing Bearings

    Science.gov (United States)

    Powers, Charles E.

    1992-01-01

    Control subsystem closed-loop angular-position-control system causing motor and bearing under test to undergo any of variety of continuous or stepping motions. Also used to test bearing-and-motor assemblies, motors, angular-position sensors including rotating shafts, and like. Monitoring subsystem gathers data used to evaluate performance of bearing or other article under test. Monitoring subsystem described in article, "Monitoring Subsystem For Testing Bearings" (GSC-13432).

  13. Radiation-resistant control system

    International Nuclear Information System (INIS)

    Cable, T.C.; Jones, S.

    1995-01-01

    REMOTEC has developed a open-quotes radiation resistanceclose quotes control system under a U.S. Department of Energy Small Business Innovative Research (SBIR) contract with assistance from the University of Florida. The SBIR goal was to develop a radiation resistant mobile robot from the ANDROS family of hazardous duty mobile robots that REMOTEC manufactures. See Refs. 1 and 2 for additional SBIR results. The control system, as well as the entire ANDROS robot, was redesigned, where necessary, to withstand radiation doses in excess of 10 6 rad. Those components of the robot that could not be purchased as open-quotes radiation hardenedclose quotes were tested under standard operating conditions for determination of their open-quotes radiation resistance.close quotes The entire ANDROS robot was then assembled with these new components and tested to > 10 6 rad

  14. Intelligent Lighting Control System

    OpenAIRE

    García, Elena; Rodríguez González, Sara; de Paz Santana, Juan F.; Bajo Pérez, Javier

    2014-01-01

    This paper presents an adaptive architecture that allows centralized control of public lighting and intelligent management, in order to economise on lighting and maintain maximum comfort status of the illuminated areas. To carry out this management, architecture merges various techniques of artificial intelligence (AI) and statistics such as artificial neural networks (ANN), multi-agent systems (MAS), EM algorithm, methods based on ANOVA and a Service Oriented Aproach (SOA). It performs optim...

  15. Controlling chaotic systems via nonlinear feedback control

    International Nuclear Information System (INIS)

    Park, Ju H.

    2005-01-01

    In this article, a new method to control chaotic systems is proposed. Using Lyapunov method, we design a nonlinear feedback controller to make the controlled system be stabilized. A numerical example is given to illuminate the design procedure and advantage of the result derived

  16. Methane Lunar Surface Thermal Control Test

    Science.gov (United States)

    Plachta, David W.; Sutherlin, Steven G.; Johnson, Wesley L.; Feller, Jeffrey R.; Jurns, John M.

    2012-01-01

    NASA is considering propulsion system concepts for future missions including human return to the lunar surface. Studies have identified cryogenic methane (LCH4) and oxygen (LO2) as a desirable propellant combination for the lunar surface ascent propulsion system, and they point to a surface stay requirement of 180 days. To meet this requirement, a test article was prepared with state-of-the-art insulation and tested in simulated lunar mission environments at NASA GRC. The primary goals were to validate design and models of the key thermal control technologies to store unvented methane for long durations, with a low-density high-performing Multi-layer Insulation (MLI) system to protect the propellant tanks from the environmental heat of low Earth orbit (LEO), Earth to Moon transit, lunar surface, and with the LCH4 initially densified. The data and accompanying analysis shows this storage design would have fallen well short of the unvented 180 day storage requirement, due to the MLI density being much higher than intended, its substructure collapse, and blanket separation during depressurization. Despite the performance issue, insight into analytical models and MLI construction was gained. Such modeling is important for the effective design of flight vehicle concepts, such as in-space cryogenic depots or in-space cryogenic propulsion stages.

  17. Radioactive waste incineration system cold demonstration test

    Energy Technology Data Exchange (ETDEWEB)

    Hozumi, Masahiro; Takaoku, Yoshinobu; Koyama, Shigeru; Nagae, Madoka; Seike, Yasuhiko; Yamanaka, Yasuhiro; Shibata, Kenji; Manabe, Kyoichi

    1984-12-01

    To demonstrate Waste Incineration System (WIS) which our company has been licensed by Combustion Engineering Inc., USA we installed a demonstration test plant in our Hiratsuka Research Laboratory and started the demonstration test on January 1984. One of the characteristics of this system is to be able to process many kinds of wastes with only one system, and to get high volume reduction factors. In our test plant, we processed paper, cloth, wood, polyethylene sheets as the samples of solid combustible wastes and spent ion exchange resins with incineration and processed condensed liquid wastes with spray drying. We have got good performances and enough Decontamination Factor (DF) data for the dust control equipment. In this paper, we introduce this demonstration test plant and report the test results up to date. (author).

  18. 10 CFR 72.162 - Test control.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Test control. 72.162 Section 72.162 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) LICENSING REQUIREMENTS FOR THE INDEPENDENT STORAGE OF SPENT NUCLEAR FUEL... Test control. The licensee, applicant for a license, certificate holder, and applicant for a CoC shall...

  19. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, Susila; Tang, Y.N.

    1994-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans. ((orig.))

  20. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, S.; Tang, Yong N.

    1995-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans