WorldWideScience

Sample records for contractor-grantee workshop vii

  1. DOE Human Genome Program contractor-grantee workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This volume contains the proceedings for the DOE Human Genome Program`s Contractor-Grantee Workshop V held in Sante Fe, New Mexico January 28, February 1, 1996. Presentations were divided into sessions entitled Sequencing; Mapping; Informatics; Ethical, Legal, and Social Issues; and Infrastructure. Reports of individual projects described herein are separately indexed and abstracted for the database.

  2. DOE Human Genome Program: Contractor-Grantee Workshop IV, November 13--17, 1994, Santa Fe, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This volume contains the proceedings of the fourth Contractor-Grantee Workshop for the Department of Energy (DOE) Human Genome Program. Of the 204 abstracts in this book, some 200 describe the genome research of DOE-funded grantees and contractors located at the multidisciplinary centers at Lawrence Berkeley Laboratory, Lawrence Livermore National Laboratory, and Los Alamos National Laboratory; other DOE-supported laboratories; and more than 54 universities, research organizations, and companies in the United States and abroad. Included are 16 abstracts from ongoing projects in the Ethical, Legal, and Social Issues (ELSI) component, an area that continues to attract considerable attention from a wide variety of interested parties. Three abstracts summarize work in the new Microbial Genome Initiative launched this year by the Office of Health and Environmental Research (OHER) to provide genome sequence and mapping data on industrially important microorganisms and those that live under extreme conditions. Many of the projects will be discussed at plenary sessions held throughout the workshop, and all are represented in the poster sessions.

  3. Genomics:GTL Contractor-Grantee Workshop IV and Metabolic Engineering Working Group Inter-Agency Conference on Metabolic Engineering 2006

    Energy Technology Data Exchange (ETDEWEB)

    Mansfield, Betty Kay [ORNL; Martin, Sheryl A [ORNL

    2006-02-01

    Welcome to the 2006 joint meeting of the fourth Genomics:GTL Contractor-Grantee Workshop and the six Metabolic Engineering Working Group Inter-Agency Conference. The vision and scope of the Genomics:GTL program continue to expand and encompass research and technology issues from diverse scientific disciplines, attracting broad interest and support from researchers at universities, DOE national laboratories, and industry. Metabolic engineering's vision is the targeted and purposeful alteration of metabolic pathways to improve the understanding and use of cellular pathways for chemical transformation, energy transduction, and supramolecular assembly. These two programs have much complementarity in both vision and technological approaches, as reflected in this joint workshop. GLT's challenge to the scientific community remains the further development and use of a broad array of innovative technologies and computational tools to systematically leverage the knowledge and capabilities brought to us by DNA sequencing projects. The goal is to seek a broad and predictive understanding of the functioning and control of complex systems--individual microbes, microbial communities, and plants. GTL's prominent position at the interface of the physical, computational, and biological sciences is both a strength and challenge. Microbes remain GTL's principal biological focus. In the complex 'simplicity' of microbes, they find capabilities needed by DOE and the nation for clean and secure energy, cleanup of environmental contamination, and sequestration of atmospheric carbon dioxide that contributes to global warming. An ongoing challenge for the entire GTL community is to demonstrate that the fundamental science conducted in each of your research projects brings us a step closer to biology-based solutions for these important national energy and environmental needs.

  4. DOE contractors' workshop: Cellular and molecular aspects of radiation induced DNA damage and repair

    International Nuclear Information System (INIS)

    1987-01-01

    For four decades the US Department of Energy and its predecessors have been the lead federal agency in supporting radiation biology research. Over the years emphasis in this program has gradually shifted from dose-effect studies on animals to research on the effects of radiations of various qualities on cells and molecules. Mechanistic studies on the action of radiation at the subcellular level are few in number and there is a need for more research in this area if we are to gain a better understanding of how radiation affects living cells. The intent of this workshop was to bring together DOE contractors and grantees who are investigating the effects of radiation at the cellular and molecular levels. The aims were to foster the exchange of information on research projects and experimental results, promote collaborative research efforts, and obtain an overview of research currently supported by the Health Effects Research Division of the Office of Health and Environmental Research. The latter is needed by the Office for program planning purposes. This report on the workshop which took place in Albuquerque, New Mexico on March 10-11, 1987, includes an overview with future research recommendations, extended abstracts of the plenary presentations, shorter abstracts of each poster presentation, a workshop agenda and the names and addresses of the attendees

  5. DOE contractors' workshop: Cellular and molecular aspects of radiation induced DNA damage and repair

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    For four decades the US Department of Energy and its predecessors have been the lead federal agency in supporting radiation biology research. Over the years emphasis in this program has gradually shifted from dose-effect studies on animals to research on the effects of radiations of various qualities on cells and molecules. Mechanistic studies on the action of radiation at the subcellular level are few in number and there is a need for more research in this area if we are to gain a better understanding of how radiation affects living cells. The intent of this workshop was to bring together DOE contractors and grantees who are investigating the effects of radiation at the cellular and molecular levels. The aims were to foster the exchange of information on research projects and experimental results, promote collaborative research efforts, and obtain an overview of research currently supported by the Health Effects Research Division of the Office of Health and Environmental Research. The latter is needed by the Office for program planning purposes. This report on the workshop which took place in Albuquerque, New Mexico on March 10-11, 1987, includes an overview with future research recommendations, extended abstracts of the plenary presentations, shorter abstracts of each poster presentation, a workshop agenda and the names and addresses of the attendees.

  6. Japanese contributions to IAEA INTOR workshop, phase two A, part 2 chapter VII: technical benefit

    International Nuclear Information System (INIS)

    Itoh, Shin-ichi; Iida, Hiromasa; Tomabechi, Ken; Tone, Tatsuzo; Fujisawa, Noboru.

    1985-07-01

    This report corresponds to Chapter VII of Japanese contribution report to IAEA INTOR Workshop, Phase Two A, Part 2. The purpose of technical benefit study is to examine the implications of having different manufacturers fabricate components of a major system of INTOR. A systematic examinations of advantages and disadvantages of designing and fabricating major INTOR components in the frame of one international joint projects is performed. (author)

  7. Proceedings of VII International Symposium on Nuclear and Related Techniques. XIII Workshop on Nuclear Physics. WONP-NURT 2011

    International Nuclear Information System (INIS)

    2012-06-01

    This year 2012, the VII International Workshop held Tecnolaser 2012 alongside the Third International Meeting Optics, Life and Heritage organized by the Center of Technological Applications and Nuclear Development from 10 to 13 April at the National Museum of Fine Arts. Tecnolaser has been held since 1997 and has contributed to the exchange between professionals from various countries of the world in the fields of optics and laser applications. The papers submitted to this event are presented in this CD-ROM.

  8. Proceedings of the Federal Transit Administration's Urban Maglev Workshop

    Science.gov (United States)

    2005-09-01

    The Federal Transit Administrations (FTA) Urban Maglev Workshop was held at FTA Headquarters in Washington, DC, on September 8-9, 2005. The key workshop goals were to review progress, share lessons learned among the grantees, and discuss future di...

  9. Brownfields Assessing Contractor Capabilities for Streamlined Site Investigation: Additional Information Regarding All Appropriate Inquiries and Hiring an Environmental Professional

    Science.gov (United States)

    This document assists Brownfields grantees and other decision makers as they assess the capabilities of contractors and consultants to determine their qualifications to provide streamlined and innovative strategies for the assessment and and cleanup.

  10. Brownfields Assessing Contractor Capabilities for Streamlined Site Investigations -- Additional Information Regarding All Appropriate Inquiries and Hiring an Environmental Professional (November 2006)

    Science.gov (United States)

    Guidance for Brownfields grantees and other decision makers to assess the capabilities of contractors and consultants to determine their qualifications to provide streamlined and innovative strategies for the assessment and cleanup of brownfields.

  11. Proceedings of the Department of Energy ALARA Workshop

    International Nuclear Information System (INIS)

    Dionne, B.J.; Baum, J.W.

    1992-01-01

    The report contains summaries of papers, discussions, and operational exercises presented at the first Department of Energy ALARA Workshop held at Brookhaven National Laboratory, Upton, New York on April 21--22, 1992. The purpose of this workshop was to provide a forum for, and enhance communication among, ALARA personnel, as well as to inform DOE's field office and contractor personnel about the Office of Health's programs and expectations from the entire DOE complex efforts in the ALARA area.The two-day workshop consisted of one day dedicated to presentations on implementing various elements of a formal ALARA program at the DOE contractors' facilities, regulatory aspects of ALARA programs, and DOE Headquarters' ALARA expectations/initiatives. The second day was devoted to detailed discussions on ALARA improvements and problems, and operational exercises on cost-benefit analyses and on ALARA job/experiment reviews. At this workshop, 70 health physicists and radiation safety engineers from 5 DOE Headquarter Offices, 7 DOE operations/area offices, and 27 contractor facilities exchanged information, which is expected to stimulate further improvement in the DOE contractors' ALARA programs. Individual papers are indexed separately

  12. Proceedings of the Department of Energy ALARA Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Dionne, B.J.; Baum, J.W. [comps.

    1992-12-31

    The report contains summaries of papers, discussions, and operational exercises presented at the first Department of Energy ALARA Workshop held at Brookhaven National Laboratory, Upton, New York on April 21--22, 1992. The purpose of this workshop was to provide a forum for, and enhance communication among, ALARA personnel, as well as to inform DOE`s field office and contractor personnel about the Office of Health`s programs and expectations from the entire DOE complex efforts in the ALARA area.The two-day workshop consisted of one day dedicated to presentations on implementing various elements of a formal ALARA program at the DOE contractors` facilities, regulatory aspects of ALARA programs, and DOE Headquarters` ALARA expectations/initiatives. The second day was devoted to detailed discussions on ALARA improvements and problems, and operational exercises on cost-benefit analyses and on ALARA job/experiment reviews. At this workshop, 70 health physicists and radiation safety engineers from 5 DOE Headquarter Offices, 7 DOE operations/area offices, and 27 contractor facilities exchanged information, which is expected to stimulate further improvement in the DOE contractors` ALARA programs. Individual papers are indexed separately.

  13. Proceedings of the Department of Energy ALARA Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Dionne, B.J.; Baum, J.W. (comps.)

    1992-01-01

    The report contains summaries of papers, discussions, and operational exercises presented at the first Department of Energy ALARA Workshop held at Brookhaven National Laboratory, Upton, New York on April 21--22, 1992. The purpose of this workshop was to provide a forum for, and enhance communication among, ALARA personnel, as well as to inform DOE's field office and contractor personnel about the Office of Health's programs and expectations from the entire DOE complex efforts in the ALARA area.The two-day workshop consisted of one day dedicated to presentations on implementing various elements of a formal ALARA program at the DOE contractors' facilities, regulatory aspects of ALARA programs, and DOE Headquarters' ALARA expectations/initiatives. The second day was devoted to detailed discussions on ALARA improvements and problems, and operational exercises on cost-benefit analyses and on ALARA job/experiment reviews. At this workshop, 70 health physicists and radiation safety engineers from 5 DOE Headquarter Offices, 7 DOE operations/area offices, and 27 contractor facilities exchanged information, which is expected to stimulate further improvement in the DOE contractors' ALARA programs. Individual papers are indexed separately.

  14. 45 CFR 1180.46 - Evaluation by the grantee.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Evaluation by the grantee. 1180.46 Section 1180.46... HUMANITIES INSTITUTE OF MUSEUM AND LIBRARY SERVICES GRANTS REGULATIONS General Conditions Which Must Be Met by a Grantee Evaluation § 1180.46 Evaluation by the grantee. A grantee shall evaluate at least semi...

  15. Proceedings of VII International Symposium on Nuclear and Related Techniques. XIII Workshop on Nuclear Physics. WONP-NURT 2011

    International Nuclear Information System (INIS)

    2011-02-01

    This year the XIII Workshop on Nuclear Physics (WONP) and the VII Symposium on Nuclear and Related Techniques (NURT) are organized jointly, by Instituto Superior de Tecnologias y Ciencias Aplicadas and Centro de Aplicaciones Tecnologicas y Desarrollo Nuclear. Both events gather scientists from several countries with top research work on nuclear physics and its applications. WONP has been carried out since 1994 promoting an ever-exchanging exchange between professionals of various nuclear and applied physics fields, those related to environmental and health care. NURT is one of the key Cuban scientific meetings since 1997 dealing with the peaceful applications of nuclear techniques in several domains of the society. WONP and NURT provide an unique opportunity for the national and international scientific community to meet outstanding researchers and discuss current trends in several areas of theoretical, experimental and applied nuclear physics and related topics. The papers submitted to this event are presented in this CD-ROM

  16. Human Genome Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-01

    The DOE Human Genome program has grown tremendously, as shown by the marked increase in the number of genome-funded projects since the last workshop held in 1991. The abstracts in this book describe the genome research of DOE-funded grantees and contractors and invited guests, and all projects are represented at the workshop by posters. The 3-day meeting includes plenary sessions on ethical, legal, and social issues pertaining to the availability of genetic data; sequencing techniques, informatics support; and chromosome and cDNA mapping and sequencing.

  17. Workshop on Language Student Attrition

    National Research Council Canada - National Science Library

    Whelan, Bree

    2001-01-01

    Seventy individuals from Government agencies (military and civilian), academia, and contractor organizations attended all or parts of a Workshop on student Attrition held at the Defense Language Institute Foreign Language Center (DLIFLC...

  18. The second international workshop on enterprise security

    OpenAIRE

    Chang, V; Ramachandran, M; Yen, NN; Walters, RJ; Wills, G

    2016-01-01

    Welcome to our second international workshop on Enterprise Security as part of CloudCom 2015, Vancouver, Canada, November 30-December 3, 2015. The first international workshop held in Singapore has been a major success since then we have achieved greater team activities, research, and international collaborations as the major and significant outcome of our first workshop on this topic. Enterprise Security involves all business, products, governments, organization, and their contractors. This ...

  19. 28 CFR 91.60 - Grantee's responsibilities.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Grantee's responsibilities. 91.60 Section 91.60 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) GRANTS FOR CORRECTIONAL FACILITIES...'s responsibilities. Specific duties. As part of its role in the NEPA process, the grantee agency...

  20. 42 CFR 59.212 - Grantee accountability.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Grantee accountability. 59.212 Section 59.212 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR FAMILY PLANNING SERVICES Grants for Family Planning Service Training § 59.212 Grantee accountability. (a...

  1. 42 CFR 56.113 - Grantee accountability.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Grantee accountability. 56.113 Section 56.113 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR MIGRANT HEALTH SERVICES General Provisions § 56.113 Grantee accountability. (a) Accounting for grant award...

  2. 42 CFR 124.8 - Grantee accountability.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Grantee accountability. 124.8 Section 124.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT... and Modernization § 124.8 Grantee accountability. (a) Records requirements. (1) Applicants who have...

  3. Proceedings of the 2. Workshop on Wendelstein VII-X

    International Nuclear Information System (INIS)

    Rau, F.; Leotta, G.G.

    1988-01-01

    The specification and final concept of W VII-X were discussed. Plasma equilibrium; plasma stability; transport; bootstrap current; plasma parameter prediction methods; boundary regions; heating; the coil system; and mechanical engineering aspects were considered. A Helias configuration with five field periods (rather than the four previously suggested) is advocated. The major radius is increased to 6.5m to alleviate plasma-wall interaction effects due to the increased number of field periods. The magnetic field is reduced from 4 to 3T, to keep the amount of superconducting material needed for coils fixed

  4. 42 CFR 86.18 - Grantee accountability.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Grantee accountability. 86.18 Section 86.18 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH... Occupational Safety and Health Training Grants § 86.18 Grantee accountability. (a) Accounting for grant award...

  5. 34 CFR 75.612 - Supervision and inspection by the grantee.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Supervision and inspection by the grantee. 75.612 Section 75.612 Education Office of the Secretary, Department of Education DIRECT GRANT PROGRAMS What Conditions Must Be Met by a Grantee? Construction § 75.612 Supervision and inspection by the grantee. A grantee shall maintain competent architectural...

  6. Extraction of Tc(VII) and Re(VII) on TRU resin

    Energy Technology Data Exchange (ETDEWEB)

    Guerin, Nicolas; Riopel, Remi; Kramer-Tremblay, Sheila [Canadian Nuclear Laboratories (CNL), Chalk River, ON (Canada). Radiobiology and Health Branch; De Silva, Nimal; Cornett, Jack [Ottawa Univ., ON (Canada). Dept. of Earth and Environmental Sciences; Dai, Xiongxin [China Institute for Radiation Protection, Beijing (China)

    2017-06-01

    TRU resin can be used to rapidly and selectively extract Tc(VII) and Re(VII). The retention capacity curves of Tc(VII) and Re(VII) for HNO{sub 3}, HCl, H{sub 2}SO{sub 4} and H{sub 3}PO{sub 4} solutions were studied and prepared. Tc(VII) and Re(VII) were simultaneously extracted in 2 M H{sub 2}SO{sub 4} and 1.5 M H{sub 3}PO{sub 4} and were effectively separated from Mo(VI) and Ru(III). Tc(VII) and Re(VII) remained strongly bonded to the resin even after washing using a large volume of 2 M H{sub 2}SO{sub 4} at a relatively high flow rate. Also, they were both completely eluted from the resin using 15 mL of near boiling water, an eluent directly compatible for ICP-MS instrument measurements.

  7. Monoclonal antibodies to human factor VII: a one step immunoradiometric assay for VII:Ag.

    OpenAIRE

    Takase, T; Tuddenham, E G; Chand, S; Goodall, A H

    1988-01-01

    Three mouse monoclonal antibodies (RFF-VII/1, RFF-VII/2, and RFF-VII/3) which bind specifically to different epitopes on human factor VII antigen were raised. Two of the antibodies, RFF-VII/1 and RFF-VII/2, bound strongly to factor VII antigen (VII:Ag), but only RFF-VII/1 and RFF-VII/3 were potent inhibitors of factor VII coagulation activity (VII:C). RFF-VII/1 and RFF-VII/2 were used in a one step, double monoclonal immunoradiometric assay for VII:Ag. This was highly reproducible and detecte...

  8. 75 FR 24571 - Designation of New Grantee

    Science.gov (United States)

    2010-05-05

    ... considered the application (filed 12/01/09) submitted by the Culpeper County Chamber of Commerce, grantee of... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [Order No. 1677] Designation of New Grantee... the Board's regulations, including Section 400.28. The Secretary of Commerce, as Chairman of the Board...

  9. 7 CFR 1944.419 - Final grantee evaluation.

    Science.gov (United States)

    2010-01-01

    ...) PROGRAM REGULATIONS (CONTINUED) HOUSING Self-Help Technical Assistance Grants § 1944.419 Final grantee...HA or its successor agency under Public Law 103-354 employees or an organization under contract to Fm... determine how successful the grantee was in meeting goals and objectives as defined in the agreement...

  10. 25 CFR 276.7 - Standards for grantee financial management systems.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Standards for grantee financial management systems. 276.7... grantee financial management systems. (a) Grantee financial management systems for grants and subgrantee financial management systems for subgrants shall provide for: (1) Accurate, current, and complete disclosure...

  11. 42 CFR 51c.112 - Grantee accountability.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Grantee accountability. 51c.112 Section 51c.112 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR COMMUNITY HEALTH SERVICES General Provisions § 51c.112 Grantee accountability. (a) Accounting for grant award...

  12. 45 CFR 1180.47 - Federal evaluation-Cooperation by a grantee.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Federal evaluation-Cooperation by a grantee. 1180... FOUNDATION ON THE ARTS AND THE HUMANITIES INSTITUTE OF MUSEUM AND LIBRARY SERVICES GRANTS REGULATIONS General Conditions Which Must Be Met by a Grantee Evaluation § 1180.47 Federal evaluation—Cooperation by a grantee. A...

  13. HUD Exchange Grantee Database

    Data.gov (United States)

    Department of Housing and Urban Development — The About Grantees section of the HUD Exchange brings up contact information, reports, award, jurisdiction, and location data for organizations that receive HUD...

  14. 1998 federal technical standards workshop: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-10-01

    The theme for the 1998 workshop was Standards Management -- A World of Change and Opportunities. The workshop`s goal was to further the implementation of the National Technology Transfer and Advancement Act of 1995 (Public Law 104-113) through the sharing of standards management success stories, lessons learned, and emerging initiatives within the Executive Branch of the Federal Government. The target audience for this workshop included agency/department and contractor personnel and representatives of standards developing organizations that either used technical standards in their work for the Federal Government of participated in standards writing/management activities in support of the missions and programs of Federal agencies/departments. As with previous standards workshops sponsored by the DOE, views on the technical subject areas under the workshop theme were solicited from and provided by agency Standards Executives and standards program managers, voluntary standards organizations, and the private sector. This report includes vugraphs of the presentations.

  15. DOE contractor trade network: a decade of experience in training resource exchange

    International Nuclear Information System (INIS)

    Croll, P.; Weseman, M.

    1989-01-01

    Training Resources and Data Exchange (TRADE) refers to a series of activities designed to increase communication and exchanges of ideas, information, and resources among US Department of Energy contractor operated facilities in the field of training and human resource development. TRADE activities are planned and implemented by the DOE Contractor TRADE Executive Committee. TRADE objectives are accomplished through conference workshops, publications, and special interest groups. TRADE special interest groups include the following: computer-based training, emergency preparedness, industrial hygiene training, human resource issues, radiation protection training, safeguards and security training. The authors discuss how TRADE has evolved to meet changing contractor needs to improve human performance over the last 10 years. TRADE currently has working agreements to share training information with INPO, the Federal Laboratories Consortium, and the National Registry of Radiation Protection Technologists

  16. 1993 Radiation Protection Workshop: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    The 1993 DOE Radiation Protection Workshop was conducted from April 13 through 15, 1993 in Las Vegas, Nevada. Over 400 Department of Energy Headquarters and Field personnel and contractors from the DOE radiological protection community attended the Workshop. Forty-nine papers were presented in eleven separate sessions: Radiological Control Manual Implementation, New Approaches to Instrumentation and Calibration, Radiological Training Programs and Initiatives, External Dosimetry, Internal Dosimetry, Radiation Exposure Reporting and Recordkeeping, Air Sampling and Monitoring Issues, Decontamination and Decommissioning of Sites, Contamination Monitoring and Control, ALARA/Radiological Engineering, and Current and Future Health Physics Research. Individual papers are indexed separately on the database.

  17. 1993 Radiation Protection Workshop: Proceedings

    International Nuclear Information System (INIS)

    1993-01-01

    The 1993 DOE Radiation Protection Workshop was conducted from April 13 through 15, 1993 in Las Vegas, Nevada. Over 400 Department of Energy Headquarters and Field personnel and contractors from the DOE radiological protection community attended the Workshop. Forty-nine papers were presented in eleven separate sessions: Radiological Control Manual Implementation, New Approaches to Instrumentation and Calibration, Radiological Training Programs and Initiatives, External Dosimetry, Internal Dosimetry, Radiation Exposure Reporting and Recordkeeping, Air Sampling and Monitoring Issues, Decontamination and Decommissioning of Sites, Contamination Monitoring and Control, ALARA/Radiological Engineering, and Current and Future Health Physics Research. Individual papers are indexed separately on the database

  18. 6th Workshop on waste management contracts

    International Nuclear Information System (INIS)

    2000-01-01

    The workshop was intended for participants from industry and the service sector and municipalities responsible in particular for the legal aspects involved in the waste management business, namely for concluding the contracts with customers and contractors and for contract management in compliance with the laws and regulations of Germany and the European Union, including the relevant pollution control and monitoring obligations. Participants of the workshop received in-depth information and guidance through discussion of contracts and document types of relevance in this context. (orig./CB) [de

  19. 20 CFR 668.710 - What planning documents must an INA grantee submit?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What planning documents must an INA grantee... Planning/Funding Process § 668.710 What planning documents must an INA grantee submit? Each grantee... participant services and expenditures covering the two-year planning cycle. We will, in consultation with the...

  20. Monoclonal antibodies to human factor VII: production of immunodepleted plasma for VII:C assays.

    OpenAIRE

    Takase, T; Tuddenham, E G; Chand, S; Goodall, A H

    1988-01-01

    A high affinity monoclonal antibody to factor VII (RFF-VII/1), coupled to sepharose, was used to immunodeplete factor VII from normal plasma. The plasma could be used as a substrate in a one stage coagulation assay and performed as well as, or better than, commercially available factor VII deficient plasma or plasma from congenitally deficient factor VII patients. Plasma from normal donors (n = 20), patients with liver disease (n = 20), and patients receiving warfarin (n = 20), or congenitall...

  1. Contractor evaluations in the contractor selection process.

    Science.gov (United States)

    2014-04-01

    The current contractor evaluation system in use within the Kentucky Transportation Cabinet is based on the contractor evaluation system developed as part of SPR 212-00 "Quality Based Prequalification of Contractors." This system relies on average per...

  2. Factor VII deficiency

    Science.gov (United States)

    ... this page: //medlineplus.gov/ency/article/000548.htm Factor VII deficiency To use the sharing features on this page, please enable JavaScript. Factor VII (seven) deficiency is a disorder caused by a ...

  3. 36 CFR 64.12 - Standards for grantee financial management systems.

    Science.gov (United States)

    2010-07-01

    ... financial management systems. 64.12 Section 64.12 Parks, Forests, and Public Property NATIONAL PARK SERVICE... RIGHTS-OF-WAY § 64.12 Standards for grantee financial management systems. The grantees' Financial Management Systems shall meet the minimum standards set forth in OMB Circular A-102, Attachment G. ...

  4. 34 CFR 377.31 - What information must a grantee provide to eligible clients?

    Science.gov (United States)

    2010-07-01

    ... clients? 377.31 Section 377.31 Education Regulations of the Offices of the Department of Education... PROJECTS TO INCREASE CLIENT CHOICE PROGRAM What Post-Award Conditions Must Be Met by a Grantee? § 377.31 What information must a grantee provide to eligible clients? Each grantee shall advise all clients and...

  5. EKÜL VII Foorum = VII Forum SKTE / Sven Lillepalu

    Index Scriptorium Estoniae

    Lillepalu, Sven

    2004-01-01

    7. oktoobril toimus hotell Olümpia Alfa saalis EKÜL VII foorum. Ettekanded puudutasid järgmisi teemasid: korteriühistu remondi planeerimine, finantseerimine, nõuanded korteriühistuid puudutava seadusandluse kohta. Vt. samas: Eesti Korteriühistute VII Foorumi avalik pöördumine Eesti Vabariigi Valitsuse, Eesti Vabariigi Riigikogu, Eesti Vabariigi Presidendi poole lk. 9, 39

  6. Contractor safety

    International Nuclear Information System (INIS)

    Blanton, M.L.; Montgomery, E.W.

    1991-01-01

    The recent trend in the United States and Shell Oil Company EandP has been to increase use of contractors to do specialized work. Many companies now use contractors almost exclusively for operations such as drilling, well workovers, construction, and many specialty and routine maintenance tasks. Today, approximately 75% of Shell Oil Company's actual operating work force in EandP is contract. Clearly, HSandE considerations must become an increasingly important part of the contractor selection process. This paper reports on the Shell Oil Company's evolution from a bidder selection process to a program of Matching Owner and Contractor. Well has begun to expand efforts to make better assessments of contractor's HSandE capabilities and values in pre-bid considerations. Focus is on pre-bid evaluations to select contractors that have strong HSandE commitments and values. Contractor safety performance in this industry must be brought up to the same standards as operating companies. In Shell Oil EandP is only willing to contractors who can and are willing to do that

  7. Evaluated Nuclear Data Covariances: The Journey From ENDF/B-VII.0 to ENDF/B-VII.1

    International Nuclear Information System (INIS)

    Smith, Donald L.

    2011-01-01

    detail various aspects of the data producer community's efforts to improve the evaluation methods and to add covariance content to the ENDF/B library. The present paper offers just a brief glimpse of these activities by drawing material from covariance papers presented at meetings, workshops and international conferences during the past five years. Highlighted are: advances in methods for producing and processing covariance data, recently developed covariance visualization capabilities, and the development and implementation of quality assurance (QA) requirements that should be satisfied for covariance data to be included in ENDF/B-VII.1.

  8. Contractor management

    NARCIS (Netherlands)

    Ustailieva, E.; Starren, A.

    2013-01-01

    Companies function more and more in networks (i.e. contractor chains with contractors, suppliers and/or other companies. This asks for several companies/parties to work together to get the work done. Working in contractor chains is very common in sectors like maintenance, construction, cleaning, and

  9. ENDF/B-VII.1 versus ENDF/B-VII.0: What's Different?

    International Nuclear Information System (INIS)

    Cullen, D.E.

    2012-01-01

    Recently the new ENDF/B-VII.1 library was released; this completely replaces the earlier ENDF/B-VII.0 library. One of the first questions we ask about a new library is: What's Different? Here I attempt to at least partially answer this question. I present results in both tabulated form (so you can quickly determine if any evaluations of interest to you have changed), and graphic form (so that you can see how much evaluations have changed and in what energy ranges). For the table I have compared what I refer to as the ENDF neutron data, namely MF=1 through 6. Here I did a character-by-character comparison of the same sections (MF/MT) that appear I both ENDF/B-VII.0 and VII.1; here I found differences in 170 evaluations. For the plots I have only compared the total cross sections for all evaluations that are common to both libraries, and I found that of the 423 evaluations in ENDF/B-VII.1, 120 of these have total cross sections that differ by 1% or more from the evaluation of the same isotope in ENDF/B-VII.0. This should be considered only a preliminary comparison; obviously there can be more subtle important differences that do not effect of total cross sections. Here I present plots comparing the total cross section of these 120 isotopes. The plots are only broad overviews of the total cross sections over their entire energy range. If you have interest in more detailed plots for specific evaluations, you can download the evaluations (1,2) and the PREPRO (3) codes I used to prepare and view the data. This is all I needed to do my comparisons, and is all you should need to do any more detailed comparisons to meet your individual needs.

  10. Genetics Home Reference: factor VII deficiency

    Science.gov (United States)

    ... Facebook Twitter Home Health Conditions Factor VII deficiency Factor VII deficiency Printable PDF Open All Close All Enable Javascript to view the expand/collapse boxes. Description Factor VII deficiency is a rare bleeding disorder that varies ...

  11. 76 FR 13097 - Institute of Museum and Library Services; Evaluation by Grantees

    Science.gov (United States)

    2011-03-10

    ... With Institutions of Higher Education, Hospitals, and Other Non-Profit Organizations, provides, in part... Services; Evaluation by Grantees AGENCY: Institute of Museum and Library Services, National Foundation On.... IMLS amends 45 CFR 1180.46, Evaluation by the grantee, to ensure that IMLS requirements conform to the...

  12. 20 CFR 669.510 - What planning documents must an NFJP grantee submit?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What planning documents must an NFJP grantee submit? 669.510 Section 669.510 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF... Accountability, Planning and Waiver Provision § 669.510 What planning documents must an NFJP grantee submit? Each...

  13. Third EC/ISOE workshop on occupational exposure management at nuclear power plants

    International Nuclear Information System (INIS)

    Bone, Mike; Morris, Simon

    2002-01-01

    The third workshop was jointly sponsored by the IAEA and OECD Nuclear Energy Agency. It was organised by the European Commission Directorate-General for the Environment, Nuclear Safety and Civil Protection and the ISOE European Regional Technical Centre. The workshop provided a forum for Health Physics practitioners and operators to exchange information and experience on occupational exposure issues at Nuclear Power Plants (NPPs). There were approximately 130 participants of whom 63% were from utilities, 11% from contractors and 26% from regulatory bodies

  14. 20 CFR 632.118 - Nepotism.

    Science.gov (United States)

    2010-04-01

    ... administrative capacity by the Native American grantee, subgrantee or contractor. The Native American grantee may... persons employed in an administrative capacity for the Native American grantee, its subgrantees or... describing all advantages, conflicts and/or disadvantages which may result from the specific personnel action...

  15. Increased volume of distribution for recombinant activated factor VII and longer plasma-derived factor VII half-life may explain their long lasting prophylactic effect.

    Science.gov (United States)

    Mathijssen, Natascha C J; Masereeuw, Rosalinde; Holme, Pal Andre; van Kraaij, Marian G J; Laros-van Gorkom, Britta A P; Peyvandi, Flora; van Heerde, Waander L

    2013-08-01

    Prophylaxis with plasma-derived or recombinant activated factor VII is beneficial in severe factor VII deficiency. To understand why prophylactic treatment with both products is efficacious, we conducted a pharmacokinetic study. Ten factor VII deficient patients were treated with either recombinant activated (20 μg/kg) or plasma-derived (25 IU/kg) factor VII in a cross-over design. Pharmacokinetic parameters were analyzed through activated factor VII activity, factor VII clotting activity, and factor VII antigen levels on depicted time points. Factor VII activity half-lifes, determined by non-compartmental and one-compartmental analysis (results in brackets), were shorter for recombinant activated (1.4h; 0.7h) than for plasma-derived factor VII (6.8h; 3.2h); both recombinant activated (5.1h; 2.1h and plasma-derived factor VII (5.8h; 3.2h) resulted in longer half-lives of factor VII antigen. Activated factor VII half-lives (based on activated factor VII activity levels) were significantly higher compared to factor VII clotting activity (1.6h; 0.9h). Volumes of distribution were significantly higher for activated factor VII (236 ml/kg; 175 ml/kg, measured by activated factor VII) as compared to plasma-derived factor VII (206 ml/kg; 64 ml/kg, measured by factor FVII activity), suggesting a plasma- and extracellular fluid distribution for recombinant activated factor VII. Recombinant activated factor VII showed significantly shorter half-lifes than plasma-derived factor VII. Volumes of distribution were significantly higher for treatment with recombinant activated factor VII. The longer half-life for plasma-derived factor VII, compared to recombinant activated factor VII, and the increased volume of distribution for recombinant activated factor VII, compared to plasma-derived factor VII may further elucidate the beneficial effect of prophylactic treatment of both products. Copyright © 2013 Elsevier Ltd. All rights reserved.

  16. 48 CFR 252.229-7004 - Status of contractors as a direct contractor (Spain).

    Science.gov (United States)

    2010-10-01

    ... direct contractor (Spain). 252.229-7004 Section 252.229-7004 Federal Acquisition Regulations System... contractor (Spain). As prescribed in 229.402-70(d), use the following clause: Status of Contractor as a Director Contractor (Spain) (JUN 1997) (a) “Direct Contractor,” as used in this clause, means an individual...

  17. Proceedings of US-Japan heliotron-stellarator workshop: Volume 2

    International Nuclear Information System (INIS)

    1987-01-01

    This paper is the second of four volumes on the US-Japan Heliotron-Stellarator workshop. It contains talks on the following: Ripple Transport at Arbitrary Collision Frequency, Transport Scaling in the Collisionless-Detrapping Regime, Transport Analysis for Heliotron E, Transport Analysis for ATF, Simulation Analysis of Heating and Transport, Analysis of W VII-A Data, Numerical Study of Fast Ion Confinement, Benchmarks of NBI Codes for Stellarators, ECH Commissioning and Plans for ATF, and ECH and ICH Startup Analysis

  18. Grantees Guide to Research Databases at IDRC

    International Development Research Centre (IDRC) Digital Library (Canada)

    . 7. 7. Creating search alerts. 9. 8. IDRC Digital Library (IDL). 11. 9. Key contacts. 12. Commercial databases conditions of use. These resources are governed by license agreements which restrict use to IDRC employees and grantees taking ...

  19. Monoclonal anti-human factor VII antibodies. Detection in plasma of a second protein antigenically and genetically related to factor VII.

    OpenAIRE

    Broze, G J; Hickman, S; Miletich, J P

    1985-01-01

    Several murine monoclonal anti-human Factor VII antibodies were produced using hybridoma technology. Two noncompetitive monoclonal antibodies were used to examine by Western blotting the Factor VII cross-reactive material (CRM) in normal human plasma and three commercially available congenitally Factor VII-deficient plasmas, and to construct a facile "sandwich" immunoassay for plasma Factor VII. A second, previously undescribed, form of Factor VII CRM was detected in human plasma, which on We...

  20. Transactions of the criticality alarm systems workshop

    International Nuclear Information System (INIS)

    1988-01-01

    The first Criticality Alarm workshop was held by the US Department of Energy Albuquerque Operations Office in 1985. This second workshop is the first held on an international level. There were 98 persons in attendance. They represented the Department of Energy (DOE) field offices, DOE contractors, the Nuclear Regulatory Commission (NRC), NRC licensees, and agencies in the United Kingdom, France, West Germany, and Japan. Topics were on practices experience, and development. A key value of the workshop was the sharing of critical alarm system experiences, problems, and advances in the state of the art. In addition, several Criticality Alarm Systems (CAS) equipment systems were exhibited. Papers were presented on: nature of criticality accidents; lessons learned from past accidents; application of ANS 8.3 standard; gamma and neutron detection systems; research and development in progress; testing at Oak Ridge and Los Alamos; methods used to place detectors; centralized readout feature; false alarms; trip-point settings; and testing and maintenance. The individual papers have been cataloged separately

  1. 20 CFR 668.650 - Can INA grantees exclude segments of the eligible population?

    Science.gov (United States)

    2010-04-01

    ... eligible population? 668.650 Section 668.650 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... population? (a) No, INA grantees cannot exclude segments of the eligible population. INA grantees must document in their Two Year Plan that a system is in place to afford all members of the eligible population...

  2. 45 CFR 287.160 - What reports must a grantee file regarding financial operations?

    Science.gov (United States)

    2010-10-01

    ... Requirements § 287.160 What reports must a grantee file regarding financial operations? (a) Grantees will use SF-269A to make an annual financial report of expenditures for program activities and services. (b) Two annual financial reports will be due to the appropriate Regional Office. The interim SF-269A is...

  3. 77 FR 11559 - Submission for OMB Review; Comment Request DERT Extramural Grantee Data Collection

    Science.gov (United States)

    2012-02-27

    ... areas and gaps in the research. Information gained from this primary data collection will be used in...; Comment Request DERT Extramural Grantee Data Collection SUMMARY: Under the provisions of Section 3507(a)(1... currently valid OMB control number. Proposed Collection: Title: DERT Extramural Grantee Data Collection...

  4. 77 FR 60128 - Noncompetitive Supplements to Nursing Assistant and Home Health Aide Program Grantees

    Science.gov (United States)

    2012-10-02

    ... Noncompetitive Supplements to Nursing Assistant and Home Health Aide Program Grantees AGENCY: Health Resources... expansion supplements of $100,000 to 10 Nursing Assistant and Home Health Aide (NAHHA) Program grantees to... Management; Care Coordination and Follow Up; and Behavioral Health and Social Support for Home Health Aides...

  5. 40 CFR 35.936-5 - Grantee responsibility.

    Science.gov (United States)

    2010-07-01

    ... accomplishment of the project for which EPA grant assistance is awarded. The grantee is responsible for the... into under the grant (except as § 35.936-6 provides) in accordance with sound business judgment and good administrative practice. This includes issuance of invitations for bids or requests for proposals...

  6. The importance of residues 195-206 of human blood clotting factor VII in the interaction of factor VII with tissue factor

    International Nuclear Information System (INIS)

    Wildgoose, P.; Kisiel, W.; Kazim, A.L.

    1990-01-01

    Previous studies indicated that human and bovine factor VII exhibit 71% amino acid sequence identity. In the present study, competition binding experiments revealed that the interaction of human factor VII with cell-surface human tissue factor was not inhibited by 100-fold molar excess of bovine factor VII. This finding indicated that bovine and human factor VII are not structurally homologous in the region(s) where human factor VII interacts with human tissue factor. On this premise, the authors synthesized three peptides corresponding to regions of human factor VII that exhibited marked structural dissimilarity to bovine factor VII; these regions of dissimilarity included residues 195-206, 263-274, and 314-326. Peptide 195-206 inhibited the interaction of factor VII with cell-surface tissue factor and the activation of factor X by a complex of factor VIIa and tissue factor half-maximally at concentrations of 1-2 mM. A structurally rearranged form of peptide 195-206 containing an aspartimide residue inhibited these reactions half-maximally at concentrations of 250-300 μM. In contrast, neither peptide 263-274 nor peptide 314-326, at 2 mM concentration, significantly affected either factor VIIa interaction with tissue factor or factor VIIa-mediated activation of factor X. The data provide presumptive evidence that residues 195-206 of human factor VII are involved in the interaction of human factor VII with the extracellular domain of human tissue factor apoprotein

  7. Newly diagnosed congenital factor VII deficiency and utilization of recombinant activated factor VII (NovoSeven(®)).

    Science.gov (United States)

    Bartosh, Nicole S; Tomlin, Tara; Cable, Christian; Halka, Kathleen

    2013-01-01

    This case report presents a newly diagnosed congenital factor VII deficiency treated with recombinant activated factor VII (rFVIIa). Congenital factor VII deficiency is a rare autosomal-recessive bleeding disorder that occurs in fewer than 1/500,000 persons. Its presentation can vary from epistaxis to hemarthroses and severe central nervous system bleeding, and correlates poorly with factor VII levels. Our patient had not had a significant hemostatic challenge prior to his presentation and therefore never had any symptomatology suggestive of this disease. He was treated with rFVIIa, and was able to undergo repair of his fractures without bleeding. A 19-year-old African-American male presented to the emergency room after an altercation that resulted in significant trauma. He sustained bilateral mandibular angle fractures and orbital floor fractures, requiring urgent surgical correction. On initial evaluation, he was noted to have a prolonged prothrombin time of 40.1 seconds, with an International Normalized Ratio of 4.0, a normal activated partial thromboplastin time of 29.9 seconds, and a platelet count of 241. After receiving vitamin K and fresh frozen plasma, he was taken to the operating room for a temporary rigid maxillomandibular fixation. A 1:1 mixing study with normal plasma corrected the prothrombin time (decreasing from 40.7 to 14.7 seconds) and a factor VII assay revealed 5% of the normal factor VII level. The patient was diagnosed with congenital factor VII deficiency. Due to his coagulopathy and the extensive surgical correction needed, rFVIIa was administered and surgery was accomplished without hemorrhagic sequelae. This case report and review describes a rare congenital disease, the history of rFVIIa use, and its mechanism. rFVIIA use in our patient provided a treatment option that allowed the necessary surgical correction, but further prospective studies on dose optimization would ensure adequate dosing with minimal risk of severe side effects.

  8. Genetics Home Reference: glycogen storage disease type VII

    Science.gov (United States)

    ... Home Health Conditions Glycogen storage disease type VII Glycogen storage disease type VII Printable PDF Open All ... Javascript to view the expand/collapse boxes. Description Glycogen storage disease type VII (GSDVII) is an inherited ...

  9. Resources for IDRC grantees | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Our Research Support team develops tools and provides assistance to grantees. You must be an IDRC-funded researcher or IDRC staff member to use these services. Document delivery requests: Find out how to request journal articles that are not available in full text. Document delivery service: Order scholarly articles that ...

  10. 75 FR 24571 - Designation of New Grantee

    Science.gov (United States)

    2010-05-05

    ...) has considered the application (filed 03/17/2010) submitted by the Southern California Logistics... the City of Victorville, which has accepted such reissuance subject to approval by the FTZ Board. Upon... recognizes the City of Victorville as the new grantee of Foreign-Trade Zone 243, subject to the FTZ Act and...

  11. Workshop on rock mechanics issues in repository design and performance assessment

    International Nuclear Information System (INIS)

    1996-04-01

    The Center for Nuclear Waste Regulatory Analyses organized and hosted a workshop on ''Rock Mechanics Issues in Repository Design and Performance Assessment'' on behalf its sponsor the U.S. Nuclear Regulatory Commission (NRC). This workshop was held on September 19- 20, 1994 at the Holiday Inn Crowne Plaza, Rockville, Maryland. The objectives of the workshop were to stimulate exchange of technical information among parties actively investigating rock mechanics issues relevant to the proposed high-level waste repository at Yucca Mountain and identify/confirm rock mechanics issues important to repository design and performance assessment The workshop contained three technical sessions and two panel discussions. The participants included technical and research staffs representing the NRC and the Department of Energy and their contractors, as well as researchers from the academic, commercial, and international technical communities. These proceedings include most of the technical papers presented in the technical sessions and the transcripts for the two panel discussions

  12. 77 FR 9664 - Funds for Leadership Training in Pediatric Dentistry's Current Grantees; One-Year Extension

    Science.gov (United States)

    2012-02-17

    ... Leadership Training in Pediatric Dentistry's Current Grantees; One-Year Extension AGENCY: Health Resources... Funds for Leadership Training in Pediatric Dentistry's (T17) Current Grantees. SUMMARY: The Health... for the Leadership Training in Pediatric Dentistry awards to Columbia University, The Regents of the...

  13. 45 CFR 2516.810 - What types of evaluations are grantees and subgrantees required to perform?

    Science.gov (United States)

    2010-10-01

    ... Welfare (Continued) CORPORATION FOR NATIONAL AND COMMUNITY SERVICE SCHOOL-BASED SERVICE-LEARNING PROGRAMS...? All grantees and subgrantees are required to perform internal evaluations which are ongoing efforts to assess performance and improve quality. Grantees and subgrantees may, but are not required to, arrange...

  14. 76 FR 30388 - Agency Information Collection Activities: New collection Semi-Annual Progress Report for Grantees...

    Science.gov (United States)

    2011-05-25

    ... Grantees from the Services, Training, Education and Policies to Reduce Domestic Violence, Dating Violence... collection Semi- Annual Progress Report for Grantees From the Services, Training, Education and Policies To Reduce Domestic Violence, Dating Violence, Sexual Assault and Stalking in Secondary Schools Grant Program...

  15. 20 CFR 632.11 - Designation of Native American grantees.

    Science.gov (United States)

    2010-04-01

    ... the grantee's attention in writing as a result of monitoring activities, reviews, assessments, etc. (7...) Failure to have maintained cost controls resulting in excess cash on hand. (11) Failure to procure or...

  16. First living-related liver transplant to cure factor VII deficiency.

    Science.gov (United States)

    Mohan, Neelam; Karkra, Sakshi; Jolly, Anu S; Vohra, Vijay; Mohanka, Ravi; Rastogi, Amit; Soin, A S

    2015-09-01

    Congenital factor VII deficiency is an autosomal recessive serious disorder of blood coagulation with wide genotypic and phenotypic variations. The clinical presentation can vary from asymptomatic patients to patients with major bleedings in severe deficiency (factor VII factor VII. Treatment modalities include FFP and repeated recombinant factor VII infusions. We hereby report the first successful LRLT for factor VII deficiency in an infant, the first-ever youngest baby reported worldwide. A six-month-old male child presented with easy bruisability, ecchymotic patches, hematuria, and convulsions. CT of the head showed subdural hemorrhage, which was treated conservatively. He had markedly increased PT (120 s) with normal platelets, and aPTT with factor VII level factor VII level was 57%. A factor VII infusion plan for pre-, intra- and postoperative periods was formulated and TEG followed. Postoperatively, his factor VII started increasing from third day and was 38% on 24th day with PT factor VII deficiency. © 2015 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  17. Newly diagnosed congenital factor VII deficiency and utilization of recombinant activated factor VII (NovoSeven®)

    Science.gov (United States)

    Bartosh, Nicole S; Tomlin, Tara; Cable, Christian; Halka, Kathleen

    2013-01-01

    This case report presents a newly diagnosed congenital factor VII deficiency treated with recombinant activated factor VII (rFVIIa). Congenital factor VII deficiency is a rare autosomal-recessive bleeding disorder that occurs in fewer than 1/500,000 persons. Its presentation can vary from epistaxis to hemarthroses and severe central nervous system bleeding, and correlates poorly with factor VII levels. Our patient had not had a significant hemostatic challenge prior to his presentation and therefore never had any symptomatology suggestive of this disease. He was treated with rFVIIa, and was able to undergo repair of his fractures without bleeding. Case report A 19-year-old African-American male presented to the emergency room after an altercation that resulted in significant trauma. He sustained bilateral mandibular angle fractures and orbital floor fractures, requiring urgent surgical correction. On initial evaluation, he was noted to have a prolonged prothrombin time of 40.1 seconds, with an International Normalized Ratio of 4.0, a normal activated partial thromboplastin time of 29.9 seconds, and a platelet count of 241. After receiving vitamin K and fresh frozen plasma, he was taken to the operating room for a temporary rigid maxillomandibular fixation. A 1:1 mixing study with normal plasma corrected the prothrombin time (decreasing from 40.7 to 14.7 seconds) and a factor VII assay revealed 5% of the normal factor VII level. The patient was diagnosed with congenital factor VII deficiency. Due to his coagulopathy and the extensive surgical correction needed, rFVIIa was administered and surgery was accomplished without hemorrhagic sequelae. Conclusion This case report and review describes a rare congenital disease, the history of rFVIIa use, and its mechanism. rFVIIA use in our patient provided a treatment option that allowed the necessary surgical correction, but further prospective studies on dose optimization would ensure adequate dosing with minimal risk of

  18. Role of hepsin in factor VII activation in zebrafish.

    Science.gov (United States)

    Khandekar, Gauri; Jagadeeswaran, Pudur

    2014-01-01

    Factor VII, the initiator of the extrinsic coagulation cascade, circulates in human plasma mainly in its zymogen form, factor VII and in small amounts in its activated form, factor VIIa. However, the mechanism of initial generation of factor VIIa is not known despite intensive research using currently available model systems. Earlier findings suggested serine proteases factor VII activating protease and hepsin play a role in activating factor VII, however, it has remained controversial. In this paper we estimated the levels of factor VIIa and factor VII for the first time in zebrafish adult population and also reevaluated the role of the above two serine proteases in activating factor VII in vivo using zebrafish as a model system. Knockdown of factor VII activating protease and hepsin was performed followed by assaying for their effect on factor VIIa concentration and extrinsic coagulation as measured by the kinetic prothrombin time. Factor VII activating protease knockdown showed no change in kinetic prothrombin time and no effect on factor VIIa levels while hepsin knockdown increased the kinetic prothrombin time and significantly reduced the factor VIIa plasma levels. Our results thus indicate that hepsin plays a physiologically important role in factor VII activation and hemostasis in zebrafish. © 2013.

  19. From demand driven contractor selection towards value driven contractor selection

    NARCIS (Netherlands)

    Walraven, A.R.; Vries, de B.

    2009-01-01

    The procurement of a construction contractor should consider more aspects than only cost or price. Taking value and price into account to select the ‘best value for money’ bid results in adopting a structured multicriteria approach. An alternative contractor selection method is presented, which

  20. Grantees Guide for Research Database at IDRC (English)

    International Development Research Centre (IDRC) Digital Library (Canada)

    Commercial databases conditions of use. These resources are governed by license agreements which restrict use to IDRC employees and grantees taking part in projects funded by. IDRC. It is the responsibility of each user to use these products only for individual, noncommercial use without systematically downloading ...

  1. Use of recombinant factor VII for tooth extractions in a patient with severe congenital factor VII deficiency: a case report.

    Science.gov (United States)

    Weinstock, Robert J; Onyejiuwa, Andrew; Shnayder, Garry; Clarkson, Earl I

    2015-04-01

    Patients with factor VII deficiency have an increased risk of prolonged perioperative hemorrhage. In this article, the authors present a case of severe factor VII deficiency in a patient who required tooth extraction. A 44-year-old woman with severe congenital factor VII deficiency sought care for a symptomatic, carious, and nonrestorable maxillary right second molar that required extraction. The authors obtained hematologic consultation, and the patient underwent the extraction under general anesthesia in the inpatient setting. Perioperative management included performing relevant laboratory studies, preoperative recombinant factor VII infusion, and postoperative intravenous aminocaproic acid administration. No hemorrhagic complications occurred throughout the perioperative course. The degree of factor VII deficiency correlates poorly with bleeding risk. Perioperative management is variable, requiring preoperative consultation with a hematologist. Copyright © 2015 American Dental Association. Published by Elsevier Inc. All rights reserved.

  2. Synergistic effect of factor VII gene polymorphisms causing mild factor VII deficiency in a case of severe factor X deficiency.

    Science.gov (United States)

    Deshpande, Rutuja; Ghosh, Kanjaksha; Shetty, Shrimati

    2017-01-01

    Congenital combined deficiency of coagulation factors VII and X are mainly attributed to large deletions involving both the genes in chromosome 13 or occasionally due to the coincidental occurrence of independently occurring mutations. We report the molecular basis of congenital combined deficiency of factors VII and X in a 6-year-old female child. Direct DNA sequencing of both factor VII (F7) and factor X (F10) genes showed a novel homozygous missense mutation p.Cys90Tyr (c.307G>A) in exon 4 of F10. No mutations were detected in F7; however, the patient was homozygous for three polymorphic alleles known to be associated with reduced factor VII levels. The present case illustrates the synergistic effect of multiple polymorphisms resulting in phenotypic factor VII deficiency in the absence of a pathogenic mutation.

  3. 76 FR 4895 - Workshop To Discuss Issues Related to the Potential Development of Multipollutant Science and...

    Science.gov (United States)

    2011-01-27

    .... The EPA contractor, ICF International, Inc., is providing logistical support for the workshop. FOR... should be directed to Courtney Skuce at ICF International, Inc., telephone: 919-293-1660; e- mail: EPA... will be taken into account as EPA develops future plans, approaches, and processes for moving toward...

  4. Uganda cabinet approves policy initiated by IDRC grantee | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2016-06-28

    Jun 28, 2016 ... The Economic Policy Research Centre (EPRC), an IDRC grantee under the ... on May 4, 2016, with cabinet approval of their National Fertilizer Policy. ... that 20% of the country's population has some form of physical disability.

  5. Workshop on rock mechanics issues in repository design and performance assessment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The Center for Nuclear Waste Regulatory Analyses organized and hosted a workshop on ``Rock Mechanics Issues in Repository Design and Performance Assessment`` on behalf its sponsor the U.S. Nuclear Regulatory Commission (NRC). This workshop was held on September 19- 20, 1994 at the Holiday Inn Crowne Plaza, Rockville, Maryland. The objectives of the workshop were to stimulate exchange of technical information among parties actively investigating rock mechanics issues relevant to the proposed high-level waste repository at Yucca Mountain and identify/confirm rock mechanics issues important to repository design and performance assessment The workshop contained three technical sessions and two panel discussions. The participants included technical and research staffs representing the NRC and the Department of Energy and their contractors, as well as researchers from the academic, commercial, and international technical communities. These proceedings include most of the technical papers presented in the technical sessions and the transcripts for the two panel discussions. Selected papers have been indexed separately for inclusion the Energy Science and Technology Database.

  6. 20 CFR 641.550 - What responsibility do grantees/subgrantees have to place participants in unsubsidized employment?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What responsibility do grantees/subgrantees... EMPLOYMENT PROGRAM Services to Participants § 641.550 What responsibility do grantees/subgrantees have to place participants in unsubsidized employment? Because one goal of the program is to foster economic...

  7. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa; Jones, Katherine A

    2016-05-01

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.

  8. 76 FR 39015 - Contractor Performance Information

    Science.gov (United States)

    2011-07-05

    ...] Contractor Performance Information AGENCY: Environmental Protection Agency (EPA), ACTION: Direct final rule... contractor performance information. EPA is issuing a final rule because the changes are procedural in nature... Institutes of Health's Contractor Performance System (CPS) to the Department of Defense's Contractor...

  9. Contractor Selection in Saudi Arabia

    OpenAIRE

    M. A. Bajaber; M. A. Taha

    2012-01-01

    Contractor selection in Saudi Arabia is very important due to the large construction boom and the contractor role to get over construction risks. The need for investigating contractor selection is due to the following reasons; large number of defaulted or failed projects (18%), large number of disputes attributed to contractor during the project execution stage (almost twofold), the extension of the General Agreement on Tariffs and Trade (GATT) into construction industry, and finally the few ...

  10. 48 CFR 46.105 - Contractor responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is..., and furnishing such information to the Government as required. (b) The contractor may be required to...

  11. Ninth workshop on geothermal reservoir engineering: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    Ramey, H.J. Jr.; Kruger, P.; Miller, F.G.; Horne, R.N.; Brigham, W.E.; Gudmundsson, J.S. (Stanford Geothermal Program)

    1983-12-15

    (Reservoir Chemistry), Malcolm Mossman (Reservoir Chemistry), Greg Raasch (Production), Manny Nathenson (Injection), Susan Petty (Injection), Subir Sanyal (Simulation), Marty Molloy (Petrothermal), and Allen Moench (Reservoir Physics). The Workshop was organized by the Stanford Geothermal Program faculty, staff and students. We would like to thank Jean Cook, Joanne Hartford, Terri Ramey, Amy Osugi, and Marilyn King for their valued help with the Workshop arrangements and the Proceedings. We also owe thanks to the program students who arranged and operated the audio-visual equipment. The Ninth Workshop was supported by the Geothermal and Hydropower Technologies Division of the U . S . Department of Energy through contract DE-AT03-80SF11459. We deeply appreciate this continued support. H. J. Ramey, Jr., R. N. Horne, P. Kruger, W. E. Brigham, F. G. Miller, J. S . Gudmundsson -vii

  12. Seventeenth workshop on geothermal reservoir engineering: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    Ramey, H.J. Jr.; Kruger, P.; Miller, F.G.; Horne, R.N.; Brigham, W.E.; Cook, J.W. (Stanford Geothermal Program)

    1992-01-31

    PREFACE The Seventeenth Workshop on Geothermal Reservoir Engineering was held at Stanford University on January 29-31, 1992. There were one hundred sixteen registered participants which equaled the attendance last year. Participants were from seven foreign countries: Italy, Japan, United Kingdom, France, Belgium, Mexico and New Zealand. Performance of many geothermal fields outside the United States was described in the papers. The Workshop Banquet Speaker was Dr. Raffaele Cataldi. Dr. Cataldi gave a talk on the highlights of his geothermal career. The Stanford Geothermal Program Reservoir Engineering Award for Excellence in Development of Geothermal Energy was awarded to Dr. Cataldi. Dr. Frank Miller presented the award at the banquet. Thirty-eight papers were presented at the Workshop with two papers submitted for publication only. Dr. Roland Horne opened the meeting and the key note speaker was J.E. ''Ted'' Mock who discussed the DOE Geothermal R. & D. Program. The talk focused on aiding long-term, cost effective private resource development. Technical papers were organized in twelve sessions concerning: geochemistry, hot dry rock, injection, geysers, modeling, and reservoir mechanics. Session chairmen were major contributors to the program and we thank: Sabodh Garg., Jim Lovekin, Jim Combs, Ben Barker, Marcel Lippmann, Glenn Horton, Steve Enedy, and John Counsil. The Workshop was organized by the Stanford Geothermal Program faculty, staff, and graduate students. We wish to thank Pat Ota, Ted Sumida, and Terri A. Ramey who also produces the Proceedings Volumes for publication. We owe a great deal of thanks to our students who operate audiovisual equipment and to Francois Groff who coordinated the meeting arrangements for the Workshop. Henry J. Ramey, Jr. Roland N. Horne Frank G. Miller Paul Kruger William E. Brigham Jean W. Cook -vii

  13. 49 CFR 199.245 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.245 Section 199.245... Prevention Program § 199.245 Contractor employees. (a) With respect to those covered employees who are contractors or employed by a contractor, an operator may provide by contract that the alcohol testing...

  14. Japanese contributions to IAEA INTOR Workshop, Phase Two A, Part 3

    International Nuclear Information System (INIS)

    Iida, Hiromasa; Kobayashi, Takeshi; Yamada, Masao

    1988-02-01

    This report corresponds to Chapter VII of Japanese contribution report to IAEA INTOR Workshop, Phase two A, Part 3. The discussions on the following tasks are reported. Task 1. Comparative study of vertical and horizontal access configuration. Task 2. Shape memory alloy. Task 3. Ferromagnetic inserts for ripple reduction. Task 4. PF coil redundancy. Task 5. Rapid replacement of divertor and first wall. Task 6. Containment of tritium and activated dust. In the above tasks, Task 2, 3 and 4 come from the Specialist Meeting on Tokamak Concept Innovation in January, 1986. (author)

  15. 77 FR 43535 - Grantee Codes for Certified Radiofrequency Equipment

    Science.gov (United States)

    2012-07-25

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 2 [FCC 12-60] Grantee Codes for Certified Radiofrequency Equipment AGENCY: Federal Communications Commission. ACTION: Final rule. SUMMARY: This document... authorization program for radiofrequency (RF) devices under part 2 of its rules. This program is one of the...

  16. Factor VII assay

    Science.gov (United States)

    ... this page: //medlineplus.gov/ency/article/003676.htm Factor VII assay To use the sharing features on ... M. is also a founding member of Hi-Ethics and subscribes to the principles of the Health ...

  17. 49 CFR 199.115 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.115 Section 199.115... § 199.115 Contractor employees. With respect to those employees who are contractors or employed by a contractor, an operator may provide by contract that the drug testing, education, and training required by...

  18. 7 CFR 1726.27 - Contractor's bonds.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Contractor's bonds. 1726.27 Section 1726.27... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.27 Contractor's bonds. (a) RUS Form 168b, Contractor's Bond, shall be used when a contractor's bond is required by RUS Forms 200, 257...

  19. 48 CFR 47.207-5 - Contractor responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be... furnished by the contractor. Otherwise, state that the contractor shall furnish clean and sound closed-type...

  20. 48 CFR 18.102 - Central contractor registration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Central contractor... Central contractor registration. Contractors are not required to be registered in the Central Contractor.... (See 4.1102). However, contractors are required to register with CCR in order to gain access to the...

  1. Increased volume of distribution for recombinant activated factor VII and longer plasma-derived factor VII half-life may explain their long lasting prophylactic effect

    NARCIS (Netherlands)

    Mathijssen, N.C.J.; Masereeuw, R.; Holme, P.A.; Kraaij, M.G.J. van; Laros, B.A.P.; Peyvandi, F.; Heerde, W.L. van

    2013-01-01

    INTRODUCTION: Prophylaxis with plasma-derived or recombinant activated factor VII is beneficial in severe factor VII deficiency. To understand why prophylactic treatment with both products is efficacious, we conducted a pharmacokinetic study. MATERIALS AND METHODS: Ten factor VII deficient patients

  2. Assessment of training and technical assistance needs of Colorectal Cancer Control Program Grantees in the U.S.

    Science.gov (United States)

    Escoffery, Cam; Hannon, Peggy; Maxwell, Annette E; Vu, Thuy; Leeman, Jennifer; Dwyer, Andrea; Mason, Caitlin; Sowles, Shaina; Rice, Ketra; Gressard, Lindsay

    2015-01-31

    Practitioners often require training and technical assistance to build their capacity to select, adapt, and implement evidence-based interventions (EBIs). The CDC Colorectal Cancer Control Program (CRCCP) aims to promote CRC screening to increase population-level screening. This study identified the training and technical assistance (TA) needs and preferences for training related to the implementation of EBIs among CRCCP grantees. Twenty-nine CRCCP grantees completed an online survey about their screening activities, training and technical assistance in 2012. They rated desire for training on various evidence-based strategies to increase cancer screening, evidence-based competencies, and program management topics. They also reported preferences for training formats and facilitators and barriers to trainings. Many CRCCP grantees expressed the need for training with regards to specific EBIs, especially system-level and provider-directed EBIs to promote CRC screening. Grantees rated these EBIs as more difficult to implement than client-oriented EBIs. Grantees also reported a moderate need for training regarding finding EBIs, assessing organizational capacity, implementing selected EBIs, and conducting process and outcome evaluations. Other desired training topics reported with higher frequency were partnership development and data collection/evaluation. Grantees preferred training formats that were interactive such as on-site trainings, webinars or expert consultants. Public health organizations need greater supports for adopting evidence-based interventions, working with organizational-level change, partnership development and data management. Future capacity building efforts for the adoption of EBIs should focus on systems or provider level interventions and key processes for health promotion and should be delivered in a variety of ways to assist local organizations in cancer prevention and control.

  3. Recombinant activated factor VII in cardiac surgery: single-center experience.

    Science.gov (United States)

    Singh, Sarvesh Pal; Chauhan, Sandeep; Choudhury, Minati; Malik, Vishwas; Choudhary, Shiv Kumar

    2014-02-01

    The widespread off-label use of recombinant activated factor VII for the control of refractory postoperative hemorrhage continues despite a warning from the Food and Drug Administration. Although effective in reducing the need for transfusion of blood and blood products, safety concerns still prevail. To compare the dosing and efficacy of recombinant activated factor VII between pediatric and adult patients, and in the operating room and intensive care unit. The records of 69 patients (33 children and 36 adults) who underwent cardiovascular surgery and received recombinant activated factor VII were reviewed retrospectively. The dose of recombinant activated factor VII, mediastinal drainage, use of blood and blood products, incidence of thrombosis, and 28-day mortality were studied. the efficacy of recombinant activated factor VII was comparable in adults and children, despite the lower dose in adults. Prophylactic use of recombinant activated factor VII decreased the incidence of mediastinal exploration and the duration of intensive care unit stay. A 4.3% incidence of thrombotic complications was observed in this study. The efficacious dose of recombinant activated factor VII is much less in adults compared to children. Prophylactic use of recombinant activated factor VII decreases the dose required, the incidence of mediastinal exploration, and intensive care unit stay, with no survival benefit.

  4. Proceedings of the Workshop on Current and Emerging methods for Optimising Safety and Efficiency in Nuclear Decommissioning

    International Nuclear Information System (INIS)

    2017-02-01

    The workshop was organised by the Institute for Energy Technology (IFE) on behalf of the OECD Halden Reactor Project (OECD-HRP) and in collaboration with the International Atomic Energy Agency (IAEA) and the Nuclear Energy Agency (NEA). The workshop brought together more than 100 people (operators, regulators, scientists, consultants, and contractors) from 25 countries. Program: Day 1 - Successful application of R and D in decommissioning and future needs (Welcome and Opening Speeches; Session 1: Workshop Introductory Presentations; Session 2: Experience from starting, on-going and completed decommissioning projects). Day 2 - R and D and application of advanced technologies for decommissioning (Session 3: New technologies for decommissioning; Session 4: Advanced information technologies for decommissioning). Day 3 - Improving decommissioning management on project, national and international level (Session 5: Challenges and methods for improving decommissioning; Session 6: Workshop closing)

  5. Proceedings of the fourth JAEA-US EPA workshop on radiation risk assessment

    International Nuclear Information System (INIS)

    Endo, Akira; Boyd, Michael

    2007-02-01

    This report is the proceedings of the fourth workshop jointly organized by the Japan Atomic Energy Agency (JAEA) and the United States Environmental Protection Agency (US EPA) under the terms of agreement for cooperation in the field of radiation protection. The workshop was sponsored by the Nuclear Science and Engineering Directorate and was held at the Nuclear Science Research Institute, the Tokai Research and Development Center, JAEA, on November 7-8, 2006. The objective of the workshop was to exchange and discuss recent information on radiation effects, radiation risk assessment, radiation dosimetry, emergency response, radiation protection standards, and waste management. Twenty-two papers were presented by experts from JAEA, US EPA, the National Academies, Oak Ridge National Laboratory, Washington State University and the US Nuclear Regulatory Commission. Three keynotes addressed research on radiation effects and radiation protection at JAEA, the latest report on health risks from exposure to low levels of ionizing radiation published by the National Research Council (BEIR VII Phase 2), and recent developments in Committee 2 for the forthcoming recommendations of the International Commission on Radiological Protection (ICRP). The workshop provided a good opportunity for identifying future research needed for radiation risk assessment. The 22 of the presented papers are indexed individually. (J.P.N.)

  6. 48 CFR 1845.502 - Contractor responsibility.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor responsibility. 1845.502 Section 1845.502 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Contractors 1845.502 Contractor responsibility. ...

  7. 48 CFR 1609.471 - Contractor certification.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor certification... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1609.471 Contractor certification. All FEHBP carriers and applicant carriers...

  8. 48 CFR 1602.170-4 - Contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor. 1602.170-4 Section 1602.170-4 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES... 1602.170-4 Contractor. Contractor means carrier. ...

  9. Proceedings of the DOE/Yucca Mountain Site Characterization Project Radionuclde Adsorption Workshop at Los Alamos National Laboratory, September 11--12, 1990

    International Nuclear Information System (INIS)

    Canepa, J.A.

    1992-08-01

    Los Alamos National Laboratory hosted a workshop on radionuclide adsorption for the Department of Energy (DOE)/Yucca Mountain Site Characterization Project on September 11 and 12, 1990. The purpose of the workshop was to respond to a recommendation by the Nuclear Waste Technical Review Board that the DOE organize a radionuclide adsorption workshop to be attended by the DOE and its contractors involved in the measurement and modeling of such adsorption. The workshop would have two general purposes: (a) to determine the applicability of available radionuclide adsorption data on tuff and models for predicting such adsorption under existing and postclosure conditions at Yucca Mountain and (b) to establish what additional radionuclide adsorption research and model development are needed. Individual projects are processed separately for the databases

  10. Meeting the Challenges of Stakeholder Engagement and Communication: Lessons from Teacher Incentive Fund Grantees. The Harvesting Project

    Science.gov (United States)

    Koppich, Julia E.

    2010-01-01

    As of August 2010, a total of 33 states, school districts, charter school coalitions, and other education organizations had received Teacher Incentive Funds (TIF) to redesign compensation programs for teachers and principals. The U.S. Department of Education named a new cohort of TIF grantees on September 23, 2010. TIF grantees have faced a number…

  11. 48 CFR 752.7013 - Contractor-mission relationships.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor-mission....7013 Contractor-mission relationships. For use in all USAID contracts involving performance overseas.... Contractor-Mission Relationships (OCT 1989) (a) The Contractor acknowledges that this contract is an...

  12. 77 FR 64400 - Order of Succession for HUD Region VII

    Science.gov (United States)

    2012-10-19

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [FR-5550-D-10] Order of Succession for HUD Region VII... Offices (Region VII). This Order of Succession supersedes all previous Orders of Succession for HUD Region...). This publication supersedes all previous Orders of Succession for Region VII. Accordingly, the...

  13. Administrative Relief for Grantees impacted by Hurricanes Harvey, Irma, and Maria

    Science.gov (United States)

    On October 26, 2017, the Office of Management and Budget issued the attached memorandum, Administrative Relief for Grantees impacted by Hurricanes, to provide Federal agencies with flexibility to assist their grant applicants and recipients.

  14. 30 CFR 45.4 - Independent contractor register.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Independent contractor register. 45.4 Section... ADMINISTRATIVE REQUIREMENTS INDEPENDENT CONTRACTORS § 45.4 Independent contractor register. (a) Each independent contractor shall provide the production-operator in writing the following information: (1) The independent...

  15. 48 CFR 852.237-70 - Contractor responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor....237-70 Contractor responsibilities. As prescribed in 837.110, insert the following clause: Contractor Responsibilities (APR 1984) The contractor shall obtain all necessary licenses and/or permits required to perform...

  16. 42 CFR 52b.10 - What are the terms and conditions of awards?

    Science.gov (United States)

    2010-10-01

    ... program: (a) Title. The applicant must have a fee simple or other estate or interest in the site... contractor. (l) Notice of Federal Interest. The grantee shall record a Notice of Federal Interest in the... certifies that the grantee institution has fee simple title to the site free and clear of all liens...

  17. 48 CFR 1509.170-8 - Contractor Performance Report.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Performance... AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-8 Contractor Performance Report. (a) Contractor Performance Reports (interim and final) must be prepared...

  18. 48 CFR 52.241-5 - Contractor's Facilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Facilities....241-5 Contractor's Facilities. As prescribed in 41.501(c)(4), insert a clause substantially the same as the following: Contractor's Facilities (FEB 1995) (a) The Contractor, at its expense, unless...

  19. 48 CFR 52.247-28 - Contractor's Invoices.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Invoices. 52....247-28 Contractor's Invoices. As prescribed in 47.207-9(c), insert the following clause in... services: Contractor's Invoices (APR 1984) The Contractor shall submit itemized invoices as instructed by...

  20. 14 CFR 1245.108 - License to contractor.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false License to contractor. 1245.108 Section... INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.108 License to contractor. (a) Each contractor.... The license extends to the contractor's domestic subsidiaries and affiliates, if any, within the...

  1. 48 CFR 725.703 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employees. 725... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.703 Contractor employees. (a... on employees or consultants of either contractors or subcontractors providing services under an USAID...

  2. 48 CFR 33.207 - Contractor certification.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor certification... CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 33.207 Contractor certification. (a) Contractors shall provide the certification specified in paragraph (c) of this section when...

  3. 75 FR 63177 - Availability of FY 09 Grantee Performance Evaluation Reports for the Eight States of EPA Region 4...

    Science.gov (United States)

    2010-10-14

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9213-6] Availability of FY 09 Grantee Performance Evaluation... (EPA). ACTION: Notice of availability; Clean Air Act Section 105 grantee performance evaluation reports...-year evaluations of eight state air pollution control programs (Alabama Department of Environmental...

  4. Frederik VII og folkets kærlighed

    DEFF Research Database (Denmark)

    Perlt, Michael; Vinding, Niels Valdemar

    2013-01-01

    I den turbulente tid mellem de to slesvigske krige drog kong Frederik VII under en rejse til Jylland i 1857 i procession op på højene i Jelling for at modtage folkets hyldest. På det historiske sted lod Frederik VII sig fejre som danskernes konge under en stor folkefest med bønder og deres familier...

  5. 48 CFR 1845.502-70 - Contractor-acquired property.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor-acquired... Possession of Contractors 1845.502-70 Contractor-acquired property. All contractor-acquired property must be... contractor-acquired. (2) Submission of DD Form 1419, DOD Industrial Plant Requisition, or equivalent format...

  6. 48 CFR 1252.242-71 - Contractor testimony.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor testimony. 1252... Contractor testimony. As prescribed in (TAR) 48 CFR 1242.7000(b), insert the following clause: Contractor Testimony (OCT 1994) All requests for the testimony of the Contractor or its employees, and any intention to...

  7. Building Healthy Start Grantees' Capacity to Achieve Collective Impact: Lessons from the Field.

    Science.gov (United States)

    Bradley, Kimberly; Chibber, Karuna S; Cozier, Naima; Meulen, Peggy Vander; Ayres-Griffin, Colleen

    2017-12-01

    Purpose While Healthy Start has emphasized the need for multi-sectorial community engagement and collaboration since its inception, in 2014 Healthy Start adopted Collective Impact (CI) as a framework for reducing infant mortality. This paper describes the development of a peer-focused capacity-building strategy that introduced key elements of CI and preliminary findings of Healthy Start grantees' progress with using CI as an approach to collaboration. Description The Collective Impact Peer Learning Networks (CI-PLNs) consisted of eight 90-min virtual monthly meetings and one face-to-face session that reviewed CI pre-conditions and conditions. Evaluation sources included: a facilitated group discussion at the final CI-PLN exploring grantee CI and CAN accomplishments (n = 57); routine evaluations (n = 144 pre, 46 interim, and 40 post PLN) examining changes in knowledge and practices regarding CI; and post CI-PLN implementation, three in-depth interviews with grantees who volunteered to discuss their experience with CI and participation in the CI-PLN. Assessment CI-PLN participants reported increased knowledge and confidence in the application of CI. Several participants reported that the CI-PLN created a space for engaging in peer sharing challenges, successes, and best practices. Participants also reported a desire to continue implementing CI and furthering their learning. Conclusion The CI-PLNs met the initial goal of increasing Healthy Start grantees' understanding of CI and determining the initial focus of their efforts. By year five, the EPIC Center anticipates Healthy Start CANs will have a sustainable infrastructure in place that supports the established common agenda, shared measures, and ongoing and meaningful inclusion of community members.

  8. Verification OFENDF/B-VII.0, ENDF/B-VII.1 and JENDL-4.0 nuclear data libraries for criticality calculations using NEA/NSC benchmarks

    International Nuclear Information System (INIS)

    Bouhaddane, A.; Farkas, G.; Hascik, J.; Slugen, V.

    2015-01-01

    The paper presents verification of selected nuclear data libraries with the aim to apply them to fast reactor calculations. More precise results were achieved for thermal neutrons calculations. This corresponds with the demand for more precise nuclear data for fast reactors. However, fast neutron calculations show some consistency, in particular between ENDF-B/VII.1 and JENDL-4.0 nuclear data libraries. The results support the idea to prefer using newer ENDF-B/VII.1 instead of the previous version ENDF-B/VII.0. Certainly, there are still some issues to be addressed and there is potential to gain more conclusive results. Although, application of ENDF-B/VII.1 and JENDL-4.0 is expected for further calculations. (authors)

  9. Preparation of factor VII concentrate using CNBr-activated Sepharose 4B immunoaffinity chromatography.

    Science.gov (United States)

    Mousavi Hosseini, Kamran; Nasiri, Saleh

    2015-01-01

    Factor VII concentrates are used in patients with congenital or acquired factor VII deficiency or treatment of hemophilia patients with inhibitors. In this research, immunoaffinity chromatography was used to purify factor VII from prothrombin complex (Prothrombin- Proconvertin-Stuart Factor-Antihemophilic Factor B or PPSB) which contains coagulation factors II, VII, IX and X. The aim of this study was to improve purity, safety and tolerability as a highly purified factor VII concentrate. PPSB was prepared using DEAE-Sephadex and was used as the starting material for purification of coagulation factor VII. Prothrombin complex was treated by solvent/detergent at 24°C for 6 h with constant stirring. The mixture of PPSB in the PBS buffer was filtered and then chromatographed using CNBr-activated Sepharose 4B coupled with specific antibody. Factors II, IX, VII, X and VIIa were assayed on the fractions. Fractions of 48-50 were pooled and lyophilized as a factor VII concentrate. Agarose gel electrophoresis was performed and Tween 80 was measured in the factor VII concentrate. Specific activity of factor VII concentrate increased from 0.16 to 55.6 with a purificationfold of 347.5 and the amount of activated factor VII (FVIIa) was found higher than PPSB (4.4-fold). RESULTS of electrophoresis on agarose gel indicated higher purity of Factor VII compared to PPSB; these finding revealed that factor VII migrated as alpha-2 proteins. In order to improve viral safety, solvent-detergent treatment was applied prior to further purification and nearly complete elimination of tween 80 (2 μg/ml). It was concluded that immuonoaffinity chromatography using CNBr-activated Sepharose 4B can be a suitable choice for large-scale production of factor VII concentrate with higher purity, safety and activated factor VII.

  10. 13 CFR 119.8 - Are there matching requirements for grantees?

    Science.gov (United States)

    2010-01-01

    ... constraints on the historical and projected ability to raise matching funds as demonstrated by financial statements and letters of rejection from previous funders and potential new funding sources; (2) Evidence of... to the matching requirements of this section. (c) Applicants or grantees with severe constraints on...

  11. 40 CFR 35.6600 - Contractor claims.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contractor claims. 35.6600 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6600 Contractor claims. (a) General... prepared by the contractor to support a claim against the recipient; and (4) The award official determines...

  12. Is prophylaxis required for delivery in women with factor VII deficiency?

    Science.gov (United States)

    Baumann Kreuziger, L M; Morton, Colleen T; Reding, Mark T

    2013-11-01

    Factor VII (fVII) deficiency is a rare congenital bleeding disorder in which fVII activity level and bleeding tendency do not completely correlate. Pregnancy and delivery present a significant haemostatic challenge to women with fVII deficiency. Treatment with recombinant factor VIIa (rfVIIa) carries a thrombotic risk and the literature is not clear whether prophylaxis is necessary prior to delivery. The aim of this study was to define management, haemorrhagic and thrombotic complications of pregnant women with fVII deficiency through a systematic review. Medical databases (PubMed, MEDLINE, CINAHL, Academic Search Premier, Cochrane Library, Web of Science and Scopus) were searched using "factor VII deficiency" and "pregnancy" or "surgery." Overall 34 articles, four abstracts, and three institutional cases were reviewed. Literature from 1953 to 2011 reported 94 live births from 62 women with fVII deficiency. The median fVII activity was 5.5%. Haemostatic prophylaxis was used in 32% of deliveries. Without prophylaxis, 40 vaginal deliveries and 16 caesarean sections were completed. The odds of receiving prophylaxis were 2.9 times higher in women undergoing caesarean section compared to vaginal delivery. Post-partum haemorrhage occurred in 10% of deliveries with prophylaxis and 13% of deliveries without prophylaxis. The fVII level did not significantly differ between women who did and did not receive prophylaxis. We present the only systematic review of the management of pregnancy in fVII deficient women. No difference in post-partum haemorrhage was seen in deliveries with and without prophylaxis. Therefore, we recommend that rfVIIa be available in the case of haemorrhage or surgical intervention, but not as mandatory prophylaxis. © 2013 John Wiley & Sons Ltd.

  13. [Coagulation factor VII levels in uremic patients and theirs influence factors].

    Science.gov (United States)

    Fang, Jun; Xia, Ling-Hui; Wei, Wen-Ning; Song, Shan-Jun

    2004-12-01

    This study was aimed to investigate coagulation factor VII level in uremic patients with chronic renal failure and to explore theirs influence factors. The plasma levels of coagulation factor VII were detected in 30 uremic patients with chronic renal failure before and after hemodialysis for 1 month, the factor VII activity (FVII:C) was determined by one-stage coagulation method, while activated factor VII (FVIIa) was measured by one-stage coagulation method using recombinant soluble tissue factor, and factor VII antigen was detected by ELISA. The results showed that: (1) The FVIIa, FVII:C and FVIIAg levels in chronic uremic patients before hemodialysis were 4.00 +/- 0.86 microg/L, (148.5 +/- 40.4)% and (99.8 +/- 21.1)% respectively, which were significantly increased, as compared with healthy controls [2.77 +/- 1.02 microg/L, (113.1 +/- 33.0)% and (73.7 +/- 18.3)% respectively, P factor VII was positively correlated with levels of blood uria nitrogen and serum creatinine before hemodialysis but not after hemodialysis. It is concluded that the enhanced levels of coagulation factor VII in chronic uremic patients suggested abnormal activated state, herperactivity and elevated production of factor VII which correlated with renal functional injury. The abnormality of factor VII in uremia may be aggravated by hemodialysis. Coagulation factor (FVII) may be a risk factor for cardiovascular events in uremic patients who especially had been accepted long-term hemodialysis.

  14. 77 FR 52022 - Availability of FY 11 Grantee Performance Evaluation Reports for the Eight States of EPA Region 4...

    Science.gov (United States)

    2012-08-28

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9721-4] Availability of FY 11 Grantee Performance Evaluation Reports for the Eight States of EPA Region 4 and 17 Local Agencies AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability; Clean Air Act Section 105 grantee performance evaluation reports...

  15. 76 FR 64086 - Availability of FY 10 Grantee Performance Evaluation Reports for the Eight States of EPA Region 4...

    Science.gov (United States)

    2011-10-17

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9478-7] Availability of FY 10 Grantee Performance Evaluation Reports for the Eight States of EPA Region 4 and 17 Local Agencies AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability; Clean Air Act Section 105 grantee performance evaluation reports...

  16. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Science.gov (United States)

    2010-07-01

    ..., prior to such employee's engagement in any activity enumerated in section 3(6) of the Act. A farm labor... farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in Farm...

  17. Extended analyses of Se VII and Se VIII

    International Nuclear Information System (INIS)

    Vankleef, Th.A.M.; Joshi, Y.N.

    1984-01-01

    Joshi et al. (1984) have conducted an analysis of the 3d8 4s-3d8 4p transitions in As VII. The present investigation is concerned with an analysis of similar transitions in Se VIII. The selenium spectrum was photographed in the 400-1200-A wavelength region on a variety of normal-incidence spectrographs. Attention is given to least-squares-fit (LSF) and Hartree-Fock (HF) parameter values for the 3d9 4d configuration of Se VII, LSF and HF parameter values for the 3d8 4s and 3d8 4p configurations of Se VIII, the energy and composition of the levels of the 3d9 4d configuration of Se VII, classified lines in Se VII, energy levels and composition of the 3d8 4s configuration and the revised and newly determined levels of the 3d8 4p configuration of Se VIII, and newly classified lines of Se VIII. 15 references

  18. Contractor Performance Assessment Reporting System

    Data.gov (United States)

    US Agency for International Development — CPARS is a web-based system used to input data on contractor performance. Reports from the system are used as an aid in awarding contracts to contractors that...

  19. Age-related changes in factor VII proteolysis in vivo.

    Science.gov (United States)

    Ofosu, F A; Craven, S; Dewar, L; Anvari, N; Andrew, M; Blajchman, M A

    1996-08-01

    Previous studies have reported that pre-operative plasmas of patients over the age of 40 years who developed post-operative deep vein thrombosis (DVT) had approximately twice the amount of proteolysed factor VII found in plasmas of patients in whom prophylaxis with heparin or low M(r) heparin was successful. These and other studies also reported higher concentrations of thrombin-antithrombin III in pre- and post-operative plasmas of patients who developed post-operative thrombosis than in plasmas of patients in whom prophylaxis was successful. Whether the extent of factor VII proteolysis seen in the patients who developed post-operative DVT is related to the severity of their disease or age is not known. This report investigated age-related changes in the concentrations of total factor VII protein, factor VII zymogen, factor VIIa, tissue factor pathway inhibitor, thrombin-antithrombin III, and prothrombin fragment 1 + 2 in normal plasmas and the relationships between these parameters. With the exception of thrombin-antithrombin III, statistically significant increases in the concentrations of these parameters with age were found. Additionally, the differences between the concentrations of total factor VII protein and factor VII zymogen, an index factor VII proteolysis in vivo, were statistically significant only for individuals over age 40. Using linear regression analysis, a significant correlation was found to exist between the concentrations of plasma factor VIIa and prothrombin fragment 1 + 2. Since factor VIIa-tissue factor probably initiates coagulation in vivo, we hypothesize that the elevated plasma factor VIIa (reflecting a less tightly regulated tissue factor activity and therefore increased thrombin production in vivo) accounts for the high risk for post-operative thrombosis seen in individuals over the age of 40.

  20. Sixth national stakeholder workshop summary report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    On June 17--18, 1998, the Department of Energy`s (DOE) Office of Worker and Community Transition convened its sixth National Stakeholder Workshop at the Ramada Plaza Hotel Old Town in Alexandria, Virginia. Approximately 325 stakeholders attended representing DOE headquarters and field offices, contractors, labor organizations, state and local government, education and community interest groups. The meeting addressed the progress made on the issues and challenges identified at the last stakeholder`s meeting in Oakland, California on April 9--11, 1997. Also discussed were the full range of the Department`s work force issues and creative solutions to the inherent challenges of simultaneously implementing the Department`s post Cold-War mission, work force restructuring guidance, contract reform objectives, asset disposition, performance-based management requirements, and business process improvement policies. The format of the Workshop included several plenary sessions and a number of small group discussion sessions. The small group sessions focused on topics related to labor issues, work force restructuring, work force planning, community transition, and employee concerns. The sessions provided a wide range of views on worker and community transition issues. The plenary sessions of the Workshop included presentations on the following topics: welcome and introductions; opening remarks; building a better labor-management relationship; keynote speech from Secretary of Energy Federico Pena; meeting tomorrow`s challenges (early site closures); harnessing the contracting process to encourage local growth; and, the British experience in economic conversion.

  1. 48 CFR 970.4402 - Contractor purchasing system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402 Contractor purchasing system. ...

  2. 20 CFR 641.740 - How will the Department determine whether a grantee fails, meets, or exceeds the expected levels...

    Science.gov (United States)

    2010-04-01

    ... determine whether a grantee fails, meets, or exceeds the expected levels of performance for the core indicators and what will be the consequences of failing to meet expected levels of performance? (a) Aggregate... determine if a national grantee has met the expected levels of performance (including any adjustments to...

  3. Hydrogen Contractors Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Fitzsimmons, Tim [Dept. of Energy (DOE), Washington DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering

    2006-05-16

    This volume highlights the scientific content of the 2006 Hydrogen Contractors Meeting sponsored by the Division of Materials Sciences and Engineering (DMS&E) on behalf of the Office of Basic Energy Sciences (BES) of the U. S. Department of Energy (DOE). Hydrogen Contractors Meeting held from May 16-19, 2006 at the Crystal Gateway Marriott Hotel Arlington, Virginia. This meeting is the second in a series of research theme-based Contractors Meetings sponsored by DMS&E held in conjunction with our counterparts in the Office of Energy Efficiency and Renewable Energy (EERE) and the first with the Hydrogen, Fuel Cells and Infrastructure Technologies Program. The focus of this year’s meeting is BES funded fundamental research underpinning advancement of hydrogen storage. The major goals of these research efforts are the development of a fundamental scientific base in terms of new concepts, theories and computational tools; new characterization capabilities; and new materials that could be used or mimicked in advancing capabilities for hydrogen storage.

  4. Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, A.

    2011-10-01

    This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVAC companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational

  5. 44 CFR 13.24 - Matching or cost sharing.

    Science.gov (United States)

    2010-10-01

    ... donated. (f) Valuation of grantee or subgrantee donated real property for construction/acquisition. If a....25(g).) (5) Services or property financed by income earned by contractors. Contractors under a grant... from the party awarding the contract. No costs of services or property supported by this income may...

  6. 28 CFR 66.24 - Matching or cost sharing.

    Science.gov (United States)

    2010-07-01

    ... donated. (f) Valuation of grantee or subgrantee donated real property for construction/acquisition. If a... described in § 66.25(g).) (5) Services or property financed by income earned by contractors. Contractors... amounts earned from the party awarding the contract. No costs of services or property supported by this...

  7. 34 CFR 80.24 - Matching or cost sharing.

    Science.gov (United States)

    2010-07-01

    ... donated. (f) Valuation of grantee or subgrantee donated real property for construction/acquisition. If a....25(g).) (5) Services or property financed by income earned by contractors. Contractors under a grant... from the party awarding the contract. No costs of services or property supported by this income may...

  8. 45 CFR 1157.24 - Matching or cost sharing.

    Science.gov (United States)

    2010-10-01

    ... time it was donated. (f) Valuation of grantee or subgrantee donated real property for construction... § 1157.25(g).) (5) Services or property financed by income earned by contractors. Contractors under a... earned from the party awarding the contract. No costs of services or property supported by this income...

  9. Mont Terri Project - Proceedings of the 10 Year Anniversary Workshop

    International Nuclear Information System (INIS)

    Hugi, M.; Bossart, P.; Hayoz, P.

    2007-01-01

    This book is a compilation of 12 reports presented at the St-Ursanne workshop. The workshop was dedicated to the scientific community of the Mont Terri partner organisations, their management and scientific/technical staff, involved research organisations and key contractors. The purpose of the event was to acknowledge the excellent research work that has been performed over the last decade, to evaluate and discuss the present state of knowledge in selected research areas and to explore the potential for future research activities. The topical areas addressed in the workshop are of particular importance with regard to deep geological disposal of radioactive waste and focused on the issues of coupled phenomena and transport processes in argillaceous rock and the demonstration (in underground rock laboratories) of disposal feasibility. After showing the history of the Mont Terri project and the general geology of Northwestern Switzerland, the different presentations are distributed into 3 topics: (a) Coupled phenomena in argillaceous rock, (b) Transport processes in argillaceous rock, and (c) Demonstration of disposal feasibility in underground rock laboratories. The last chapter describes the research still needed and the Mont Terri rock laboratory

  10. Life-threatening bleeding in a case of autoantibody-induced factor VII deficiency.

    Science.gov (United States)

    Okajima, K; Ishii, M

    1999-02-01

    A male patient presented with life-threatening bleeding induced by autoantibody-induced factor VII (F.VII) deficiency. This patient had macroscopic hematuria, skin ecchymosis, gastrointestinal bleeding, and a neck hematoma that was causing disturbed respiration. He developed acute renal failure and acute hepatic failure, probably due to obstruction of the ureters and the biliary tract, respectively. Although activated partial thromboplastin time was normal, prothrombin time (PT) was remarkably prolonged at 71.8 seconds compared to 14.0 seconds in a normal control. Both the immunoreactive level of F.VII antigen and the F.VII activity of the patient's plasma samples were VII activity. These findings suggested the presence of a plasma inhibitor for F.VII. After administration of large doses of methylprednisolone, PT was gradually shortened and plasma levels of F.VII increased over time. Bleeding, acute renal failure, and acute hepatic failure improved markedly following the steroid treatment. These observations suggest that life-threatening bleeding can be induced by autoantibody-induced F.VII deficiency and that immunosuppressive therapy using large doses of steroid can be successful in inhibiting the production of the autoantibody.

  11. Acquired factor VII deficiency associated with acute myeloid leukemia.

    Science.gov (United States)

    Anoun, Soumaya; Lamchahab, Mouna; Oukkache, Bouchra; Qachouh, Maryam; Benchekroun, Said; Quessar, Asmaa

    2015-04-01

    Isolated acquired factor VII deficiency is a rare coagulopathy. It has been reported in 31 patients with malignancy, sepsis, postoperatively, aplastic anemia, and during bone marrow transplantation. We discuss, through a new case of acquired factor VII deficiency, the characteristics of this disease when it is associated with acute myeloid leukemia. Acquired factor VII deficiency in hematological diseases can be caused by intensive chemotherapy, infections, or hepatic dysfunction. The best treatment in developing countries remains corticosteroids associated with plasma exchange, frozen plasma, and antibiotics.

  12. 76 FR 64954 - Proposed Collection; Comment Request; Grantee Outcomes and Satisfaction

    Science.gov (United States)

    2011-10-19

    ... Request; Grantee Outcomes and Satisfaction SUMMARY: In compliance with the requirement of Section 3506(c... health science; (2) Contribution of research findings to program goals and objectives; (3) Satisfaction... of research. Satisfaction information to be collected includes measures of satisfaction with the type...

  13. 48 CFR 52.246-1 - Contractor Inspection Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Inspection....246-1 Contractor Inspection Requirements. As prescribed in 46.301, insert the following clause: Contractor Inspection Requirements (APR 1984) The Contractor is responsible for performing or having...

  14. Preparation of factor VII concentrate using CNBr-activated Sepharose 4B immunoaffinity chromatography

    OpenAIRE

    Mousavi Hosseini, Kamran; Nasiri, Saleh

    2015-01-01

    Background: Factor VII concentrates are used in patients with congenital or acquired factor VII deficiency or treatment of hemophilia patients with inhibitors. In this research, immunoaffinity chromatography was used to purify factor VII from prothrombin complex (Prothrombin- Proconvertin-Stuart Factor-Antihemophilic Factor B or PPSB) which contains coagulation factors II, VII, IX and X. The aim of this study was to improve purity, safety and tolerability as a highly purified factor VII conce...

  15. 34 CFR 380.20 - What requirements must a grantee meet before it provides for the transition of an individual in...

    Science.gov (United States)

    2010-07-01

    ... REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS AND DEMONSTRATIONS FOR PROVIDING SUPPORTED EMPLOYMENT SERVICES TO INDIVIDUALS WITH THE MOST SEVERE DISABILITIES AND TECHNICAL ASSISTANCE PROJECTS What Post-Award Conditions Must Be Met by a Grantee? § 380.20 What requirements must a grantee meet before...

  16. 48 CFR 970.5244-1 - Contractor purchasing system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970.4403 insert the following clause: Contractor Purchasing System (AUG 2009) (a) General. The Contractor...

  17. 48 CFR 52.204-7 - Central Contractor Registration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Central Contractor....204-7 Central Contractor Registration. As prescribed in 4.1105, use the following clause: Central Contractor Registration (APR 2008) (a) Definitions. As used in this clause— Central Contractor Registration...

  18. Processing needs and methodology for wastewaters from the conversion of coal, oil shale, and biomass to synfuels

    Energy Technology Data Exchange (ETDEWEB)

    1980-05-01

    The workshop identifies needs to be met by processing technology for wastewaters, and evaluates the suitability, approximate costs, and problems associated with current technology. Participation was confined to DOE Environmental Control Technology contractors to pull together and integrate past wastewater-related activities, to assess the status of synfuel wastewater treatability and process options, and to abet technology transfer. Particular attention was paid to probable or possible environmental restrictions which cannot be economically met by present technology. Primary emphasis was focussed upon process-condensate waters from coal-conversion and shale-retorting processes. Due to limited data base and time, the workshop did not deal with transients, upsets, trade-offs and system optimization, or with solids disposal. The report is divided into sections that, respectively, survey the water usage and effluent situation (II); identify the probable and possible water-treatment goals anticipated at the time when large-scale plants will be constructed (III); assess the capabilities, costs and shortcomings of present technology (IV); explore particularly severe environmental-control problems (V); give overall conclusions from the Workshop and recommendations for future research and study (VI); and, finally, present Status Reports of current work from participants in the Workshop (VII).

  19. Environmental liability and the independent contractor

    International Nuclear Information System (INIS)

    Gilmour, B.S.

    1999-01-01

    The provisions of the Environmental Protection and Enhancement Act (EPEA) regarding the relationship between a company and an independent contractor were reviewed. The EPEA was introduced in September 1993 and significantly altered the environmental laws in the province of Alberta. The provisions of the EPEA that apply to the petroleum industry are conservation and reclamation as well as provisions concerning release of substances, contaminated sites and penalties. Companies that pollute may be held liable for reclamation, even if the work was carried out by an independent contractor and despite the fact that the independent contractor is not an employee of the company. Under the current EPEA laws, companies may not be able to effectively shift responsibility for environmental liabilities to independent contractors even where the contractor was negligent. This paper presented suggestions regarding contractor agreements and due diligence to help minimize the risk of liability to companies. The paper also discussed the following two types of liabilities under the EPEA's harmful substances section: (1) the obligation to clean up an affected area, and (2) fines and penalties that may be imposed when an offence is committed

  20. Report on the symposium and workshop on the 5 MWt solar thermal test facility

    Energy Technology Data Exchange (ETDEWEB)

    1976-01-01

    Design concepts and applications for the 5 MWt Solar Thermal Test Facility at Albuquerque are discussed in 43 papers. Session topics include central receivers, solar collectors, solar energy storage, high temperature materials and chemistry. A program overview and individual contractor reports for the test facility project are included, along with reports on conference workshop sessions and users group recommendations. A list of conference attendees is appended. Separate abstracts are prepared for 39 papers.

  1. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...

  2. Factor VII-activating protease

    DEFF Research Database (Denmark)

    Ramanathan, Ramshanker; Gram, Jørgen B; Sand, Niels Peter R

    2017-01-01

    : Factor VII-activating protease (FSAP) may regulate development of cardiovascular disease (CVD). We evaluated sex differences in FSAP measures and examined the association between FSAP and coronary artery calcification (CAC) in a middle-aged population. Participants were randomly selected citizens...

  3. 20 CFR 668.296 - How are WIA funds allocated to INA grantees?

    Science.gov (United States)

    2010-04-01

    ... unable to serve its area for any reason, such as audit or debt problems, criminal activity, internal (political) strife, or lack of ability or interest. Funds may also be reallocated if a grantee has carry-in...

  4. 40 CFR 68.87 - Contractors.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... specialty work on or adjacent to a covered process. It does not apply to contractors providing incidental...

  5. 34 CFR 386.35 - What information must be provided by a grantee that is an institution of higher education to...

    Science.gov (United States)

    2010-07-01

    ... an institution of higher education to assist designated State agencies? 386.35 Section 386.35... grantee that is an institution of higher education to assist designated State agencies? A grantee that is an institution of higher education provided assistance under this part shall cooperate with the...

  6. Factor VII Deficiency: Clinical Phenotype, Genotype and Therapy.

    Science.gov (United States)

    Napolitano, Mariasanta; Siragusa, Sergio; Mariani, Guglielmo

    2017-03-28

    Factor VII deficiency is the most common among rare inherited autosomal recessive bleeding disorders, and is a chameleon disease due to the lack of a direct correlation between plasma levels of coagulation Factor VII and bleeding manifestations. Clinical phenotypes range from asymptomatic condition-even in homozygous subjects-to severe life-threatening bleedings (central nervous system, gastrointestinal bleeding). Prediction of bleeding risk is thus based on multiple parameters that challenge disease management. Spontaneous or surgical bleedings require accurate treatment schedules, and patients at high risk of severe hemorrhages may need prophylaxis from childhood onwards. The aim of the current review is to depict an updated summary of clinical phenotype, laboratory diagnosis, and treatment of inherited Factor VII deficiency.

  7. Teacher Incentive Fund: First Implementation Report, 2006 and 2007 Grantees

    Science.gov (United States)

    Humphrey, Daniel C.; Gallagher, H. Alix; Yee, Kaily M.; Goss, G. Kyle; Campbell, Ashley Z.; Cassidy, Lauren J.; Mitchell, Nyema M.

    2012-01-01

    The Teacher Incentive Fund (TIF) supports projects that are designed to reform teacher and principal compensation. Initially, the Department of Education (the Department) made two rounds of awards, in 2006 and 2007, to a total of 34 grantees. The specific goals of TIF were to reward teachers and principals for improving student achievement,…

  8. 78 FR 11164 - Policy on Contractor Profits

    Science.gov (United States)

    2013-02-15

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System Policy on Contractor Profits AGENCY... Authorization Act for Fiscal Year 2013. Section 804, Department of Defense Policy on Contractor Profits... modifications to such guidelines that are necessary to ensure an appropriate link between contractor profit and...

  9. 48 CFR 46.301 - Contractor inspection requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inspection... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.301 Contractor inspection requirements. The contracting officer shall insert the clause at 52.246-1, Contractor Inspection Requirements, in solicitations...

  10. 48 CFR 970.5203-3 - Contractor's organization.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor's organization... for Management and Operating Contracts 970.5203-3 Contractor's organization. As prescribed in 970.0371-9, insert the following clause: Contractor's Organization (DEC 2000) (a) Organization chart. As...

  11. 48 CFR 450.303-1 - Contractor requests.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contractor requests. 450.303-1 Section 450.303-1 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS Contract Adjustments 450.303-1 Contractor requests. Contractor...

  12. 48 CFR 2427.305-2 - Follow-up by contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Follow-up by contractor....305-2 Follow-up by contractor. (b) Contractor reports. Contractors shall complete and submit to the... Contracting Officer shall send the form to those contractors whose contract work may have required the...

  13. VII International Congress of Engineering Physics

    Science.gov (United States)

    2015-01-01

    In the frame of the fortieth anniversary celebration of the Universidad Autónoma Metropolitana and the Physics Engineering career, the Division of Basic Science and Engineering and its Departments organized the "VII International Congress of Physics Engineering". The Congress was held from 24 to 28 November 2014 in Mexico City, Mexico. This congress is the first of its type in Latin America, and because of its international character, it gathers experts on physics engineering from Mexico and all over the globe. Since 1999, this event has shown research, articles, projects, technological developments and vanguard scientists. These activities aim to spread, promote, and share the knowledge of Physics Engineering. The topics of the Congress were: • Renewable energies engineering • Materials technology • Nanotechnology • Medical physics • Educational physics engineering • Nuclear engineering • High precision instrumentation • Atmospheric physics • Optical engineering • Physics history • Acoustics This event integrates lectures on top trending topics with pre-congress workshops, which are given by recognized scientists with an outstanding academic record. The lectures and workshops allow the exchange of experiences, and create and strengthen research networks. The Congress also encourages professional mobility among all universities and research centres from all countries. CIIF2014 Organizing and Editorial Committee Dr. Ernesto Rodrigo Vázquez Cerón Universidad Autónoma Metropolitana - Azcapotzalco ervc@correo.azc.uam.mx Dr. Luis Enrique Noreña Franco Universidad Autónoma Metropolitana - Azcapotzalco lnf@correo.azc.uam.mx Dr. Alberto Rubio Ponce Universidad Autónoma Metropolitana - Azcapotzalco arp@correo.azc.uam.mx Dr. Óscar Olvera Neria Universidad Autónoma Metropolitana - Azcapotzalco oon@correo.azc.uam.mx Professor Jaime Granados Samaniego Universidad Autónoma Metropolitana - Azcapotzalco jgs@correo.azc.uam.mx Dr. Roberto Tito Hern

  14. 32 CFR 989.23 - Contractor prepared documents.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Contractor prepared documents. 989.23 Section... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.23 Contractor prepared documents. All Air Force... should reflect on the cover sheet they are an Air Force document. Contractor preparation information...

  15. 6 CFR 25.8 - Government contractor Defense.

    Science.gov (United States)

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Government contractor Defense. 25.8 Section 25.8...-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.8 Government contractor Defense. (a) Criteria for... applicability of the government contractor defense. In determining whether to issue such Certification, the...

  16. 42 CFR 455.202 - Limitation on contractor liability.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Limitation on contractor liability. 455.202 Section... § 455.202 Limitation on contractor liability. (a) A program contractor, a person, or an entity employed... contractor will not be held to have violated any criminal law and will not be held liable in any civil action...

  17. Recombinant factor VIIa treatment for asymptomatic factor VII deficient patients going through major surgery.

    Science.gov (United States)

    Livnat, Tami; Shenkman, Boris; Spectre, Galia; Tamarin, Ilia; Dardik, Rima; Israeli, Amnon; Rivkind, Avraham; Shabtai, Moshe; Marinowitz, Uri; Salomon, Ophira

    2012-07-01

    Factor VII deficiency is the most common among the rare autosomal recessive coagulation disorders worldwide. In factor VII deficient patients, the severity and clinical manifestations cannot be reliably determined by factor VII levels. Severe bleeding tends to occur in individuals with factor VII activity levels of 2% or less of normal. Patients with 2-10% factor VII vary between asymptomatic to severe life threatening haemorrhages behaviour. Recombinant factor VIIa (rFVIIa) is the most common replacement therapy for congenital factor VII deficiency. However, unlike haemophilia patients for whom treatment protocols are straight forward, in asymptomatic factor VII deficiency patients it is still debatable. In this study, we demonstrate that a single and very low dose of recombinant factor VIIa enabled asymptomatic patients with factor VII deficiency to go through major surgery safely. This suggestion was also supported by thrombin generation, as well as by thromboelastometry.

  18. Workshop 'Reducing the share of drilling in the total cost of geothermal power generation'; Workshop 'Senkung des bohrtechnischen Anteils an den geothermischen Stromgestehungskosten'

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    For a further development of geothermal power generation, technological adaptations of drilling technology will be required that will reduce the specific power generation cost. This workshop discussed the options for adaptation and the resulting cost improvements. Both technical and non-technical issues were tackled. The full-text documents of the workshop (overheads) can be downloaded at http://www.ie-leipzig.de. Subjects were: (1) Downhole engine technology; (2) New drilling equipment in consideration of geothermal requirements; (3) New drilling equipment in consideration of geothermal requirements; (4) Innovative drilling concepts/ Current cost allotment; (5) Higher efficiency in drilling with flushing adapted to drilling horizons; (6) MWD/LWD technologies of the KW industry; (7) Completion technology in geothermal plants; (8) Time and cost planning in drilling plans; (9) Cost-optimized drilling from a drilling contractor's view; (10) Requirements and obstacles in the licensing of new drilling equipment. (orig.)

  19. Tissue Factor-Factor VII Complex As a Key Regulator of Ovarian Cancer Phenotypes.

    Science.gov (United States)

    Koizume, Shiro; Miyagi, Yohei

    2015-01-01

    Tissue factor (TF) is an integral membrane protein widely expressed in normal human cells. Blood coagulation factor VII (fVII) is a key enzyme in the extrinsic coagulation cascade that is predominantly secreted by hepatocytes and released into the bloodstream. The TF-fVII complex is aberrantly expressed on the surface of cancer cells, including ovarian cancer cells. This procoagulant complex can initiate intracellular signaling mechanisms, resulting in malignant phenotypes. Cancer tissues are chronically exposed to hypoxia. TF and fVII can be induced in response to hypoxia in ovarian cancer cells at the gene expression level, leading to the autonomous production of the TF-fVII complex. Here, we discuss the roles of the TF-fVII complex in the induction of malignant phenotypes in ovarian cancer cells. The hypoxic nature of ovarian cancer tissues and the roles of TF expression in endometriosis are discussed. Arguments will be extended to potential strategies to treat ovarian cancers based on our current knowledge of TF-fVII function.

  20. Plasma factor VII-activating protease is increased by oral contraceptives and induces factor VII activation in-vivo

    DEFF Research Database (Denmark)

    Sidelmann, Johannes J; Skouby, Sven O; Kluft, Cornelis

    2011-01-01

    Oral contraceptive (OC) use influences the hemostatic system significantly and is a risk factor for development of cardiovascular disease. Factor VII-activating protease (FSAP) has potential effects on hemostasis. The 1601GA genotype of the 1601G/A polymorphism in the FSAP gene expresses a FSAP...... progestins. FSAP genotypes, FSAP and factor VII (FVII) plasma measures were assessed at baseline and after 6 cycles of OC. The 1601GA genotype was present in 49 (8.3%) of the women and was associated with significantly reduced levels of FSAP (P=0.001). OC use increased FSAP antigen by 25% and FSAP activity...

  1. Factor VII deficiency: a single-center experience.

    Science.gov (United States)

    Salcioglu, Zafer; Akcay, Arzu; Sen, Hulya Sayilan; Aydogan, Gonul; Akici, Ferhan; Tugcu, Deniz; Ayaz, Nuray Aktay; Baslar, Zafer

    2012-11-01

    Congenital factor VII deficiency is the most common form of rare coagulation factor deficiencies. This article presents a retrospective evaluation of 73 factor VII deficiency cases that had been followed at our center. The study consisted of 48 males and 25 females (2 months-19 years). Thirty-one (42.5%) of them were asymptomatic. Out of symptomatic patients, 17 had severe clinical symptoms, whereas 8 presented with moderate and 17 with mild symptoms. The symptoms listed in order of frequency were as follows: epistaxis, petechia or ecchymose, easy bruising, and oral cavity bleeding. The genotype was determined in 8 patients. Recombinant activated factor VII (rFVIIa) was used to treat 49 bleeding episodes in 8 patients after 2002. In 2 patients with repeated central nervous system bleeding prophylaxis with rFVIIa was administered. No allergic and thrombotic events were observed during both treatment and prophylaxis courses. Antibody occurrence was not detected in the patients during treatment.

  2. Studies on normal-conducting coils for Wendelstein VII-X

    International Nuclear Information System (INIS)

    Harmeyer, E.; Kisslinger, J.; Rau, F.; Sapper, J.; Wobig, H.

    1990-08-01

    For Wendelstein VII-X, the next step stellarator experiment at IPP Garching, a Helias configuration has been chosen. The goals of Wendelstein VII-X are to continue the development of the modular stellarator and to demonstrate the reactor capability of this stellarator line. The main data of the selected HS5-10 configuration with five field periods are: major radius R 0 = 5.5 m, magnetic induction B 0 = 3 T and stored magnetic energy W ≅ 0.6 GJ. For comparison with the superconducting coil system which is foreseen for Wendelstein VII-X, a pulsed water-cooled normal-conducting version has been designed in order to explore the limitations and restrictions of this approach. Limitations are the high ohmic power dissipated in the coils and the electric energy currently available at IPP. Normal-conducting coils would allow to apply the well-known techniques in manufactoring these coils, as successful in use in the Wendelstein VII-AS experiment. But these techniques are applicable also for the conductor proposed for the superconducting coils of Wendelstein VII-X. In this report the time-dependent current and resistance of the coil system circuit is considered; the electric power needed, the total dissipated energy, and the temperature rise of the coil copper is calculated. Scaling laws are derived and parameter studies are made by varying the geometrical dimensions of the system. (orig.)

  3. Neutral transport calculations for W VII-X. First applications to W VII-X

    International Nuclear Information System (INIS)

    Sardei, F.

    1988-01-01

    Results of neutral gas transport calculations obtained with the DEGAS code are presented for a W VII-AS model plasma and a source of neutrals due to limiter recycling. For typical profiles of the plasma parameters as predicted for an ECRH discharge, the simulation yields a radial drop of the average neutral population by a factor of 30. The neutrals are strongly localized near the limiter and have a poloidal minimum at its opposite side. For a W VII-X configuration (HS4-12), a neutral source given by a high recycling ion flux equally distributed over the wall is considered. For an ion density of 5 x 10 1 3 /cc and 30 eV edge temperature, the neutrals originating from the wall completely ionize within the ergodic region. The corresponding average energy of cx neutrals hitting the wall is less than 30 eV. Neutral penetration into the plasma locally depends on the distance between wall and separatrix

  4. Leading Education Innovations in Rural Schools: Reflections from i3 Grantees

    Science.gov (United States)

    Fox, Tom; Friedrich, Linda; Harmon, Hobart; McKithen, Clarissa; Phillips, Andie; Savell, Susan; Schaefer, Victoria; Silva, Mihiri

    2017-01-01

    The Investing in Innovation (i3) Improving Rural Achievement Community, a professional learning community of grantees under the US Department of Education's i3 program, created this document to share knowledge and experiences related to working in rural districts across the United States. Grounded in field-based experiences and lessons, it serves…

  5. Tissue Factor–Factor VII Complex as a Key Regulator of Ovarian Cancer Phenotypes

    Directory of Open Access Journals (Sweden)

    Shiro Koizume

    2015-01-01

    Full Text Available Tissue factor (TF is an integral membrane protein widely expressed in normal human cells. Blood coagulation factor VII (fVII is a key enzyme in the extrinsic coagulation cascade that is predominantly secreted by hepatocytes and released into the bloodstream. The TF–fVII complex is aberrantly expressed on the surface of cancer cells, including ovarian cancer cells. This procoagulant complex can initiate intracellular signaling mechanisms, resulting in malignant phenotypes. Cancer tissues are chronically exposed to hypoxia. TF and fVII can be induced in response to hypoxia in ovarian cancer cells at the gene expression level, leading to the autonomous production of the TF–fVII complex. Here, we discuss the roles of the TF–fVII complex in the induction of malignant phenotypes in ovarian cancer cells. The hypoxic nature of ovarian cancer tissues and the roles of TF expression in endometriosis are discussed. Arguments will be extended to potential strategies to treat ovarian cancers based on our current knowledge of TF–fVII function.

  6. Reaction of Pu(VII) with certain aliphatic alcohols in basic media

    International Nuclear Information System (INIS)

    Tananaev, I.G.

    1992-01-01

    The kinetics of Pu(VII) reduction by methanol and ethanol in 0.5-5.0 M NaOH are studied by spectrophotometry. The rate constants of the studied reactions are calculated. The rate constants increase in concert with the reductant concentration but sharply decrease with increasing base concentration in the reaction medium. The principal factor affecting the rate of Pu(VII) reduction by alcohols is probably steric in nature. Secondary alcohols are more active in basic medium. The resulting experimental data also confirm the very strong oxidizing capability of Pu(VII), the rate of reduction of which by CH 3 OH or C 2 H 5 OH compared with Np(VII) under similar conditions is 20-50 times faster

  7. Military Contractors - Too Much Dependence

    National Research Council Canada - National Science Library

    Hill, Nathan E

    2008-01-01

    .... There is undoubtedly a need for military contractors and there are numerous positive arguments in their favor. However, the negative arguments have not been highlighted enough recently and the scales are now out of balance. The intent of this research paper is to encourage the U.S. military to rebalance the scales and curb the over-reliance on contractors.

  8. The responsibility of the contractor for project deficiencies

    Directory of Open Access Journals (Sweden)

    Pušac Jovana

    2011-01-01

    Full Text Available In this paper the author analyzes a civil law responsibility of the Contractor for project deficiencies resulting in reduced quality of the construction, i.e. not affecting its solidity. Primary obligation of the Contractor is to perform works in compliance with professional standards, the contract and the approved project. The Contractor cannot change the approved project at will, even when he has designed it. Hence, the question must be raised of the obligation of the Contractor to strictly abide by the project, assigned to him by the Authority, regardless of evident deficiencies of the Project and of his responsibility for performing works in compliance with the said project resulting in deficiencies in the construction, that is construction works. If the latter hypothesis is correct, then it must be established what deficiencies in the project fall under the responsibility of the Contractor (visible or hidden, i.e. the issue of dividing responsibility between the Project Designer and the Contractor in terms of the project deficiencies must be set up and solved. Finally, it is also important to define the realization of rights and duties of the Contractor in case the Contractor has to recede from the Project. In this paper the author tries to offer detail and complete answers to raised questions.

  9. Structural incorporation of MgCl2 into ice VII at room temperature

    Science.gov (United States)

    Watanabe, Mao; Komatsu, Kazuki; Noritake, Fumiya; Kagi, Hiroyuki

    2017-05-01

    Raman spectra and X-ray diffraction patterns were obtained from 1:100 and 1:200 \\text{MgCl}2:\\text{H}2\\text{O} solutions (in molar ratio) at pressures up to 6 GPa using diamond anvil cells (DACs) and compared with those of pure water. The O-H stretching band from ice VII crystallized from the 1:200 solution was approximately 10 cm-1 higher than that of pure ice VII. The phase boundaries between ice VII and VIII crystallized from the MgCl2 solutions at 4 GPa were 2 K lower than those of pure ice VII and VIII. These observations indicate that ice VII incorporates MgCl2 into its structure. The unit cell volumes of ice VII crystallized from pure water and the two solutions coincided with each other within the experimental error, and salt incorporation was not detectable from the cell volume. Possible configurations of ion substitution and excess volume of ice VIII were simulated on the basis of density functional theory (DFT) calculations.

  10. 48 CFR 952.251-70 - Contractor employee travel discounts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employee travel... Contractor employee travel discounts. As prescribed in 951.7002, insert the following clause: Contractor Employee Travel Discounts (AUG 2009) (a) The Contractor shall take advantage of travel discounts offered to...

  11. 48 CFR 245.608 - Screening of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Screening of contractor inventory. 245.608 Section 245.608 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Disposal of Contractor Inventory 245.608 Screening of contractor inventory. ...

  12. 48 CFR 1553.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor qualifications. 1553.209 Section 1553.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209 Contractor qualifications. ...

  13. 48 CFR 45.501 - Prime contractor alternate locations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Prime contractor alternate... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property Administration 45.501 Prime contractor... administration from another contract administration office, for purposes of evaluating prime contractor...

  14. 48 CFR 1852.209-72 - Composition of the contractor.

    Science.gov (United States)

    2010-10-01

    ... contractor. 1852.209-72 Section 1852.209-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one legal...

  15. 48 CFR 53.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor qualifications. 53.209 Section 53.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.209 Contractor qualifications. ...

  16. 48 CFR 2936.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor... Construction 2936.201 Evaluation of contractor performance. The HCA must establish procedures to evaluate construction contractor performance and prepare performance reports as required by FAR 36.201. ...

  17. 48 CFR 1552.209-76 - Contractor performance evaluations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor performance... 1552.209-76 Contractor performance evaluations. As prescribed in section 1509.170-1, insert the following clause in all applicable solicitations and contracts. Contractor Performance Evaluations (OCT 2002...

  18. 48 CFR 8.406-7 - Contractor Performance Evaluation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor Performance... ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 8.406-7 Contractor Performance Evaluation. Ordering activities must prepare an evaluation of contractor performance for each...

  19. 48 CFR 32.909 - Contractor inquiries.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inquiries. 32.909 Section 32.909 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Prompt Payment 32.909 Contractor inquiries. (a) Direct questions...

  20. Age-dependent regulation of ERF-VII transcription factor activity in Arabidopsis thaliana.

    Science.gov (United States)

    Giuntoli, Beatrice; Shukla, Vinay; Maggiorelli, Federica; Giorgi, Federico M; Lombardi, Lara; Perata, Pierdomenico; Licausi, Francesco

    2017-10-01

    The Group VII Ethylene Responsive Factors (ERFs-VII) RAP2.2 and RAP2.12 have been mainly characterized with regard to their contribution as activators of fermentation in plants. However, transcriptional changes measured in conditions that stabilize these transcription factors exceed the mere activation of this biochemical pathway, implying additional roles performed by the ERF-VIIs in other processes. We evaluated gene expression in transgenic Arabidopsis lines expressing a stabilized form of RAP2.12, or hampered in ERF-VII activity, and identified genes affected by this transcriptional regulator and its homologs, including some involved in oxidative stress response, which are not universally induced under anaerobic conditions. The contribution of the ERF-VIIs in regulating this set of genes in response to chemically induced or submergence-stimulated mitochondria malfunctioning was found to depend on the plant developmental stage. A similar age-dependent mechanism also restrained ERF-VII activity upon the core-hypoxic genes, independently of the N-end rule pathway, which is accounted for the control of the anaerobic response. To conclude, this study shed new light on a dual role of ERF-VII proteins under submergence: as positive regulators of the hypoxic response and as repressors of oxidative-stress related genes, depending on the developmental stage at which plants are challenged by stress conditions. © 2017 John Wiley & Sons Ltd.

  1. National Radon Contractor Proficiency Program. Proficiency report: Supplement

    International Nuclear Information System (INIS)

    1991-02-01

    The report, a supplement to the RCP Proficiency Report, will further assist governmental officials in providing advice to the public on the selection of proficient radon mitigation contractors. These reports list 1,123 contractors who have met the requirements of the RCP Program as of December 15, 1990. The Proficiency Report provides information on each contractor's name, RCP identification number, company name, address, phone number, and geographic service area. The report provides two additional tables, indexed by company name and by RCP identification number. The report is intended to help users quickly identify a proficient contractor if only the company name is known, or to verify which contractor is associated with a particular ID number

  2. Contractor Software Charges

    National Research Council Canada - National Science Library

    Granetto, Paul

    1994-01-01

    .... Examples of computer software costs that contractors charge through indirect rates are material management systems, security systems, labor accounting systems, and computer-aided design and manufacturing...

  3. 48 CFR 2452.251-70 - Contractor employee travel.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor employee travel... 2452.251-70 Contractor employee travel. As prescribed in 2451.7001, insert the following clause in all cost-reimbursement solicitations and contracts involving travel: Contractor Employee Travel (OCT 1999...

  4. 48 CFR 3036.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor performance. 3036.201 Section 3036.201 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY... contractor performance. (a)(2) Performance reports shall be prepared and entered into the Contractor...

  5. 48 CFR 2152.215-70 - Contractor records retention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor records... PRECONTRACT PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 2152.215-70 Contractor records retention. As prescribed in 2115.071, insert the following clause: Contractor Records Retention (OCT 2005...

  6. 48 CFR 36.506 - Superintendence by the contractor.

    Science.gov (United States)

    2010-10-01

    ... contractor. 36.506 Section 36.506 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Superintendence by the contractor. The contracting officer shall insert the clause at 52.236-6, Superintendence by the Contractor, in solicitations and contracts when a fixed-price construction contract or a fixed...

  7. 48 CFR 1652.204-70 - Contractor records retention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor records... of FEHBP Clauses 1652.204-70 Contractor records retention. As prescribed in 1604.705 the following clause will be inserted in all FEHB Program contracts. Contractor Records Retention (JUL 2005...

  8. 48 CFR 4.102 - Contractor's signature.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor's signature. 4.102 Section 4.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Contract Execution 4.102 Contractor's signature. (a) Individuals. A contract with an...

  9. 48 CFR 253.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications. ...

  10. Diagnosing Causes of Teacher Retention, Mobility and Turnover: Guidelines for TIF Grantees

    Science.gov (United States)

    Finster, Matthew

    2015-01-01

    To effectively address teacher turnover, Teacher Incentive Fund (TIF) grantees need to follow an approach that entails aligning the tracking, diagnosing, and intervening processes. Unfortunately, too often retention strategies are implemented without regard to the various types of teacher turnover and specific data about the causes of turnover.…

  11. 30 CFR 875.20 - Contractor eligibility.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 875.20 Section 875.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION CERTIFICATION AND NONCOAL RECLAMATION § 875.20 Contractor eligibility. Every...

  12. 30 CFR 874.16 - Contractor eligibility.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 874.16 Section 874.16 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.16 Contractor eligibility. To receive...

  13. 7 CFR 3015.183 - Access to contractor records.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Access to contractor records. 3015.183 Section 3015... contractor records. The Attachment 0 requires recipients to include in specified kinds of contracts a provision for access to the contractor's records by the recipient and the Federal government. The following...

  14. 7 CFR 1944.676 - Preapplication procedures.

    Science.gov (United States)

    2010-01-01

    ... include proposed direct and indirect administrative costs, such as personnel, fringe benefits, travel... Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS...; (vii) The estimated number of very low- and low-income minority and nonminority persons the grantee...

  15. 48 CFR 3052.204-71 - Contractor employee access.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contractor employee access... CLAUSES Text of Provisions and Clauses 3052.204-71 Contractor employee access. As prescribed in (HSAR) 48...: Contractor Employee Access (JUN 2006) (a) “Sensitive Information,” as used in this Chapter, means any...

  16. Determinants of contractor pricing strategy

    OpenAIRE

    Moses, O. Douglas

    1988-01-01

    This paper investigates pricing strategies used by major defense contractors. Two pricing strategies are identified and discussed: penetration, which calls for a relatively low initial price followed by little reduction in price over time, and skimming, which calls for a relatively high initial price coupled with greater reduction in price over time. It is argued that contractor pricing strategy will depend on features of the defense program under consideration and featur...

  17. Plasmodium falciparum ookinete expression of plasmepsin VII and plasmepsin X.

    Science.gov (United States)

    Li, Fengwu; Bounkeua, Viengngeun; Pettersen, Kenneth; Vinetz, Joseph M

    2016-02-24

    Plasmodium invasion of the mosquito midgut is a population bottleneck in the parasite lifecycle. Interference with molecular mechanisms by which the ookinete invades the mosquito midgut is one potential approach to developing malaria transmission-blocking strategies. Plasmodium aspartic proteases are one such class of potential targets: plasmepsin IV (known to be present in the asexual stage food vacuole) was previously shown to be involved in Plasmodium gallinaceum infection of the mosquito midgut, and plasmepsins VII and plasmepsin X (not known to be present in the asexual stage food vacuole) are upregulated in Plasmodium falciparum mosquito stages. These (and other) parasite-derived enzymes that play essential roles during ookinete midgut invasion are prime candidates for transmission-blocking vaccines. Reverse transcriptase PCR (RT-PCR) was used to determine timing of P. falciparum plasmepsin VII (PfPM VII) and plasmepsin X (PfPM X) mRNA transcripts in parasite mosquito midgut stages. Protein expression was confirmed by western immunoblot and immunofluorescence assays (IFA) using anti-peptide monoclonal antibodies (mAbs) against immunogenic regions of PfPM VII and PfPM X. These antibodies were also used in standard membrane feeding assays (SMFA) to determine whether inhibition of these proteases would affect parasite transmission to mosquitoes. The Mann-Whitney U test was used to analyse mosquito transmission assay results. RT-PCR, western immunoblot and immunofluorescence assay confirmed expression of PfPM VII and PfPM X in mosquito stages. Whereas PfPM VII was expressed in zygotes and ookinetes, PfPM X was expressed in gametes, zygotes, and ookinetes. Antibodies against PfPM VII and PfPM X decreased P. falciparum invasion of the mosquito midgut when used at high concentrations, indicating that these proteases play a role in Plasmodium mosquito midgut invasion. Failure to generate genetic knockouts of these genes limited determination of the precise role of

  18. A practical due diligence strategy for managing the safety of contractors

    International Nuclear Information System (INIS)

    Catton, C.

    1998-01-01

    Ontario Hydro's Fossil Business has developed and implemented a practical program to ensure that the due diligence requirements for contractors are met, particularly in the health and safety area. Companies in the power generation business are hiring contractors to protect their competitive potential by having them perform specialty work outside the core business of generating electricity. The reasons behind this trend, and the need for companies to develop comprehensive contractor safety management systems to avoid legislative liability and cost overruns, and to have contractors work safely, are examined. The main elements of Ontario Hydro's Fossil Business Contractor Safety Management Program (contractor safety policy, contractor safety manual, contractor safety training, and a contractor safety performance database) are discussed. 2 figs., 2 appendices

  19. Key drivers for informal project coordination among sub-contractors

    DEFF Research Database (Denmark)

    Aagaard, Annabeth; Eskerod, Pernille; Madsen, Erik Skov

    2015-01-01

    understandings. Still though, many sub-contractors choose not to coordinate informally. The purpose of this paper is to identify drivers that enhance or inhibits informal coordination in projects. A qualitative, explorative case study approach was applied. Fifteen SME sub-contractors within the offshore wind...... are massive. Six drivers which enhance informal coordination and three drivers which inhibit informal coordination among sub-contractors in projects were identified. The findings imply that management in project-oriented organizations can enhance informal coordination across project sub-contractors...... and by facilitating trust building, by emphasizing previous collaboration successes with the sub-contractors and the possibility of future common projects, by being explicit about expectations on informal coordination, and by developing sub-contractor contracts that are not as tight in economic terms, but instead...

  20. FAKTOR-FAKTOR YANG MEMENGARUHI PRODUKSI GULA PTPN VII (PERSERO

    Directory of Open Access Journals (Sweden)

    Rizky Savitri

    2014-09-01

    Full Text Available ABSTRACTThis study aimed to analyze the influence of the level of sugar cane yield, labor, production process period, and supporting materials on the production of PTPN VII (Persero PG. Cinta Manis, as well as analyzing the elasticity of production and business scale  of PTPN VII (Persero PG. Cinta Manis. The method used to analyze the data were quantitative analysis of Cobb Douglas production function with ordinary least square method to observe variable influences of PG. Cinta Manis sugar production. Cobb Douglas estimation results indicate that the level of sugar cane yield, labor, production process period, and supporting materials affect sugar production in PTPN VII (Persero PG. Cinta Manis. Production elasticity of each production factor shows that the use of production factors is not yet optimal, while the production scale of the company is Increasing Return to Scale (IRTS in which the proportion of additional input will produce output with the larger proportion. Accordingly, company should utilize the factors of production optimally, improve the quality of human resources with various activities to improve skills, increase the productivity of land by having land intensification, and optimize milling period by improving the quality of machine.Keywords: PG. Cinta Manis, increasing return to scale, Cobb Douglas function, PTPN VIIABSTRAKPenelitian ini bertujuan menganalisis pengaruh tingkat rendemen, tenaga kerja, bahan pembantu dan lama lama giling terhadap produksi gula PTPN VII (Persero PG. Cinta Manis, sekaligus menganalisis elastisitas produksi dan skala usaha PTPN VII (Persero PG. Cinta Manis. Metode analisis data yang digunakan adalah  analisis kuantitatif. Analisis kuantitatif pada penelitian ini menggunakan fungsi produksi cobb douglas dengan metode ordinary least square untuk melihat pengaruh variabel-variabel yang telah ditentukan terhadap produksi gula PG. Cinta Manis. Hasil estimasi cobb douglas menunjukkan  bahwa tingkat

  1. Production and properties of monoclonal antibodies to human blood coagulation factor VII and factor VIIa

    International Nuclear Information System (INIS)

    Mann, P.; Nesbitt, J.A.; Ge, M.; Kisiel, W.

    1986-01-01

    Human factor VII is a trace vitamin K-dependent protein that circulates in blood as a single-chain precursor to a serine protease. Upon activation, two-chain factor VIIa activates factor x in the presence of tissue factor and calcium. Purified preparations of single-chain (SC) human factor VII and two-chain (TC) factor VIIa were utilized to immunize Balb/c mice. Spleen cells from these immunized mice were fused to a non-secreting NS-1 derivative of X63-Ag8 myeloma cells and grown in selective medium. Analysis of culture supernatants by EIA revealed several hybridomas that were secreting IgG specific for Sc-factor VII and TC-factor VIIa. In addition, several hybridomas secreted IgG that reacted equally well with factor VII and factor VIIa. One of the latter McAb (A-29) reacted with the heavy chain of factor VIIa and the intact factor VII molecule equally as judged by Western blotting. A-29 was produced in ascites fluid, purified and coupled to activated CH-Sepharose. Application of one liter of normal human plasma to 10 ml of this immunoadsorbent column, elution of factor VII and subsequent Western blot using 125 I-rabbit anti-human factor VII indicated a single species of factor VII(M/sub r/ = 50 KDa) in normal plasma. These specific factor VII/VIIa McAbs may prove useful in the analysis of these factors, and in the separation of SC-factor VII from TC-factor VIIa

  2. Perturbation fields in W VII-AS and Helias configurations

    International Nuclear Information System (INIS)

    Harmeyer, E.; Kisslinger, J.; Montvai, A.; Rau, F.; Wobig, H.

    1988-01-01

    Effects of pertubed topologies of the W VII-AS vacuum fields on the configuration with rational and irrational rotational transform are illustrated. Even small perturbation fields are unacceptable at rational values of the rotational transform. For example at a rotational transform = 1/2 in W VII-AS, when exceeding an effective homogeneous Bx/B = 3 x 10 -4 , the size of the rotational transform = 1/2 = 5/10 islands is doubled. At irrational values a Bx/B = 1/2% shows tolerable effects, for both W VII-AS and HS4-12. At rational values of the rotational transform = 1 near the edge, Bx/B values = 1/4 to 1/8% show a rather large increase of the aspect ratio, so an edge value of rotational transform = 1 should be avoided

  3. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Science.gov (United States)

    2010-10-01

    ... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor... instructions in NASA Procedures and Guidelines (NPR) 9501.2, NASA Contractor Financial Management Reporting...

  4. 78 FR 46783 - Federal Acquisition Regulation; Documenting Contractor Performance

    Science.gov (United States)

    2013-08-01

    ..., Sequence 1] RIN 9000-AM09 Federal Acquisition Regulation; Documenting Contractor Performance AGENCY... the Contractor Performance Assessment Reporting System (CPARS), the single Governmentwide past... Procurement Policy (OFPP) memorandum entitled ``Improving the Use of Contractor Performance Information...

  5. Private Security Contractors in Darfur

    DEFF Research Database (Denmark)

    Leander, Anna

    2006-01-01

    This article argues that the role of Private Security Contractors in Darfur reflects and reinforces neo-liberal governmentality in contemporary security governance. It is an argument (in line with other articles in this special issue) which is more interested in discussing how the privatization....... It underlines that governance is increasingly taking place through a set of (quasi-) markets, it is marked by entrepreneurial values, and a hands off approach to governance. We then discuss the way this overall change is reflected in and reinforced by the role of private security contractors in Darfur. Drawing...... at these processes is necessary to understand the role of private security contractors in Darfur. But more than this, practices in Darfur entrench neo-liberal governmentality in security more generally. The managerial and `de-politicizing' approach to security in Darfur displaces alternative views not only...

  6. 76 FR 37704 - Federal Acquisition Regulation; Documenting Contractor Performance

    Science.gov (United States)

    2011-06-28

    ... Federal Acquisition Regulation; Documenting Contractor Performance AGENCY: Department of Defense (DoD..., and to require all past performance information be entered into the Contractor Performance Assessment... Contractor Performance Information. These changes provide Governmentwide standardized evaluation factors and...

  7. Financial management of construction contractors.

    OpenAIRE

    Lacaria, Chris J.

    1994-01-01

    The scope of this paper is to discuss the financial management of a construction contractor. This paper attempts to approach this subject in a logical and systematic way. It communicates the importance of financial analysis and planning along with cash planning and profit planning. This report is not intended to be an all inclusive discussion of financial management in construction. Contractor's Financial Management is an extremely important subject. It has been told ...

  8. Technology transfer - insider protection workshop (Safeguards Evaluation Method - Insider Threat)

    International Nuclear Information System (INIS)

    Strait, R.S.; Renis, T.A.

    1986-01-01

    The Safeguards Evaluation Method - Insider Threat, developed by Lawrence Livermore National Laboratory, is a field-applicable tool to evaluate facility safeguards against theft or diversion of special nuclear material (SNM) by nonviolent insiders. To ensure successful transfer of this technology from the laboratory to DOE field offices and contractors, LLNL developed a three-part package. The package includes a workbook, user-friendly microcomputer software, and a three-day training program. The workbook guides an evaluation team through the Safeguards Evaluation Method and provides forms for gathering data. The microcomputer software assists in the evaluation of safeguards effectiveness. The software is designed for safeguards analysts with no previous computer experience. It runs on an IBM Personal Computer or any compatible machine. The three-day training program is called the Insider Protection Workshop. The workshop students learn how to use the workbook and the computer software to assess insider vulnerabilities and to evaluate the benefits and costs of potential improvements. These activities increase the students' appreciation of the insider threat. The workshop format is informal and interactive, employing four different instruction modes: classroom presentations, small-group sessions, a practical exercise, and ''hands-on'' analysis using microcomputers. This approach to technology transfer has been successful: over 100 safeguards planners and analysts have been trained in the method, and it is being used at facilities through the DOE complex

  9. A guide for heating contractor; Opas laempoeyrittaejaelle

    Energy Technology Data Exchange (ETDEWEB)

    Solmio, H; Tuomi, S; Valkonen, J

    1996-12-31

    Heating contractor is eg. a forest owner, who is responsible for the heating of a commune owned school using firewood purchased from the contractor`s own forests. This is a new alternative for entrepreneurship in the countryside. This guide has been meant as an aid for persons starting heating contraction. It is supposed to be of importance for the designers of the communal energy supply, for advisors and instructors, as well as for those already started the heating contraction. The guide discusses the following topics: Why to became a heating contractor; The ways of heating contraction; operational requirements; Contracts; Conversion of a boiler plant to wood fuels; Fuel purchase; Heating work; Profitably estimation; Examples of operational solutions. The guide also includes as an example a draft contract for heating contraction

  10. National Radon Contractor Proficiency Program. Proficiency report, October 1990

    International Nuclear Information System (INIS)

    1990-10-01

    The report lists those individual contractors in the United States who have met the requirements of the Radon Contractor Proficiency (RCP) Program as of August 18, 1990. These requirements are designed to provide minimum proficiency criteria for individuals who design and supervise the installation of radon mitigation systems in buildings. (Some States have more stringent requirements as part of their radon certification programs. The States should be consulted directly for details on their programs; see Section 5 for a list of State radon contacts). The RCP Program measures the proficiency of an individual contractor, not their company. Therefore, users of the report who select a mitigation firm should ensure that the services are provided by the listed contractor. The National RCP Program does not accredit mitigation contractors, nor does it certify, recommend, or endorse participating companies. Only the listed contractor, not their company of affilation, are deemed proficient. The inclusion of a contractor in the report should not be interpreted as a certification or accreditation of the individual or affiliated company

  11. 40 CFR Appendix Vii to Part 266 - Health-Based Limits for Exclusion of Waste-Derived Residues*

    Science.gov (United States)

    2010-07-01

    ... Waste-Derived Residues* VII Appendix VII to Part 266 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR THE MANAGEMENT OF SPECIFIC HAZARDOUS WASTES AND SPECIFIC TYPES OF HAZARDOUS WASTE MANAGEMENT FACILITIES Pt. 266, App. VII Appendix VII to Part 266—Health...

  12. Assuring the competence of nuclear power plant contractor personnel

    International Nuclear Information System (INIS)

    2001-07-01

    This report was prepared in response to a recommendation by the IAEA International Working Group on Training and Qualification of NPP Personnel (JWG-T and Q) and supported by a number of IAEA meetings on NPP personnel training. IAEA publications on NPP training are the only international documents available to all Member States with nuclear programmes. This report complements the following IAEA publications on NPP personnel training: Technical Reports Series No. 380, Nuclear Power Plant Personnel Training and its Evaluation, A Guidebook; IAEA-TECDOC-1057, Experience in the Use of Systematic Approach to Training (SAT) for Nuclear Power Plant Personnel and IAEA-TECDOC-1063, IAEA World Survey on Nuclear Power Plant Personnel Training. This TECDOC also supplements the IAEA Safety Guide 50-SG-O1 (Rev. 1), Staffing of Nuclear Power Plants and the Recruitment Training and Authorization of Operating Personnel and Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants. Operation. Within the context of this report NPP contractors are defined as any personnel working for a nuclear power plant who are not directly employed by the nuclear power plant. Competence is the ability to perform to identified standards; it comprises skills, knowledge and attitudes and may be developed through education, experience and training. Qualification is a formal statement of achievement, resulting from an auditable assessment; if competence is assessed, the qualification becomes a formal statement of competence and may be shown on a certificate, diploma, etc. It is recognized that personnel are used to perform tasks that are of a specialised or temporary nature where it is not feasible to hire or maintain a full-time NPP employee. Accordingly, contractors may be used in a variety of situations to support NPPs. Typical situations include: supplies and services being delivered by the contractors that are subject to different quality standards based on a graded approach to assuring

  13. Assuring the competence of nuclear power plant contractor personnel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This report was prepared in response to a recommendation by the IAEA International Working Group on Training and Qualification of NPP Personnel (JWG-T and Q) and supported by a number of IAEA meetings on NPP personnel training. IAEA publications on NPP training are the only international documents available to all Member States with nuclear programmes. This report complements the following IAEA publications on NPP personnel training: Technical Reports Series No. 380, Nuclear Power Plant Personnel Training and its Evaluation, A Guidebook; IAEA-TECDOC-1057, Experience in the Use of Systematic Approach to Training (SAT) for Nuclear Power Plant Personnel and IAEA-TECDOC-1063, IAEA World Survey on Nuclear Power Plant Personnel Training. This TECDOC also supplements the IAEA Safety Guide 50-SG-O1 (Rev. 1), Staffing of Nuclear Power Plants and the Recruitment Training and Authorization of Operating Personnel and Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants. Operation. Within the context of this report NPP contractors are defined as any personnel working for a nuclear power plant who are not directly employed by the nuclear power plant. Competence is the ability to perform to identified standards; it comprises skills, knowledge and attitudes and may be developed through education, experience and training. Qualification is a formal statement of achievement, resulting from an auditable assessment; if competence is assessed, the qualification becomes a formal statement of competence and may be shown on a certificate, diploma, etc. It is recognized that personnel are used to perform tasks that are of a specialised or temporary nature where it is not feasible to hire or maintain a full-time NPP employee. Accordingly, contractors may be used in a variety of situations to support NPPs. Typical situations include: supplies and services being delivered by the contractors that are subject to different quality standards based on a graded approach to assuring

  14. (99)Tc(VII) Retardation, Reduction, and Redox Rate Scaling in Naturally Reduced Sediments.

    Science.gov (United States)

    Liu, Yuanyuan; Liu, Chongxuan; Kukkadapu, Ravi K; McKinley, James P; Zachara, John; Plymale, Andrew E; Miller, Micah D; Varga, Tamas; Resch, Charles T

    2015-11-17

    An experimental and modeling study was conducted to investigate pertechnetate (Tc(VII)O4(-)) retardation, reduction, and rate scaling in three sediments from Ringold formation at U.S. Department of Energy's Hanford site, where (99)Tc is a major contaminant in groundwater. Tc(VII) was reduced in all the sediments in both batch reactors and diffusion columns, with a faster rate in a sediment containing a higher concentration of HCl-extractable Fe(II). Tc(VII) migration in the diffusion columns was reductively retarded with retardation degrees correlated with Tc(VII) reduction rates. The reduction rates were faster in the diffusion columns than those in the batch reactors, apparently influenced by the spatial distribution of redox-reactive minerals along transport paths that supplied Tc(VII). X-ray computed tomography and autoradiography were performed to identify the spatial locations of Tc(VII) reduction and transport paths in the sediments, and results generally confirmed the newly found behavior of reaction rate changes from batch to column. The results from this study implied that Tc(VII) migration can be reductively retarded at Hanford site with a retardation degree dependent on reactive Fe(II) content and its distribution in sediments. This study also demonstrated that an effective reaction rate may be faster in transport systems than that in well-mixed reactors.

  15. Prophylactic treatment of hereditary severe factor VII deficiency in pregnancy.

    Science.gov (United States)

    Pfrepper, Christian; Siegemund, Annelie; Hildebrandt, Sven; Kronberg, Juliane; Scholz, Ute; Niederwieser, Dietger

    2017-09-01

    : Severe hereditary factor VII deficiency is a rare bleeding disorder and may be associated with a severe bleeding phenotype. We describe a pregnancy in a 33-year-old woman with compound heterozygous factor VII deficiency and a history of severe menorrhagia and mucocutaneous bleedings. After discontinuation of contraceptives, menstruation was covered with recombinant activated factor VII (rFVIIa), and during pregnancy, rFVIIa had to be administered in first trimester in doses ranging from 15 to 90 μg/kg per day because of recurrent retroplacental hematomas and vaginal bleedings. Thrombin generation was measured in first trimester at different doses of rFVIIa and showed an increase in lag time when doses of less than 30 μg/kg/day were administered, whereas time to thrombin peak and peak thrombin were not influenced. A low-dose rFVIIa prophylactic treatment of 15 μg/kg every other day in the late second and in the third trimester was sufficient to allow a successful childbirth in this patient with severe factor VII deficiency.

  16. Positivity VII (Zaanen Centennial Conference)

    CERN Document Server

    Pagter, Ben; Gaans, Onno; Veraar, Mark

    2016-01-01

    This book presents the proceedings of Positivity VII, held from 22-26 July 2013, in Leiden, the Netherlands. Positivity is the mathematical field concerned with ordered structures and their applications in the broadest sense of the word. A biyearly series of conferences is devoted to presenting the latest developments in this lively and growing discipline. The lectures at the conference covered a broad spectrum of topics, ranging from order-theoretic approaches to stochastic processes, positive solutions of evolution equations and positive operators on vector lattices, to order structures in the context of algebras of operators on Hilbert spaces. The contributions in the book reflect this variety and appeal to university researchers in functional analysis, operator theory, measure and integration theory and operator algebras. Positivity VII was also the Zaanen Centennial Conference to mark the 100th birth year of Adriaan Cornelis Zaanen, who held the chair of Analysis in Leiden for more than 25 years and was ...

  17. Development and Implementation Costs of Student Learning Objectives: Considerations for TIF Grantees

    Science.gov (United States)

    Fermanich, Mark; Carl, Brad; Finster, Matthew

    2015-01-01

    This brief explores the costs of developing and implementing Student Learning Objectives (SLOs) in order to help Teacher Incentive Fund (TIF) grantees interested in adopting SLOs anticipate and understand the costs of implementing them in a district or school. The brief focuses on the costs involved with the initial design and implementation of an…

  18. Serendipitous Discovery of Factor VII Deficiency and the Ensuing Dilemma.

    Science.gov (United States)

    Umakanthan, Jayadev M; Dhakal, Prajwal; Gundabolu, Krishna; Koepsell, Scott A; Baljevic, Muhamed

    2018-03-01

    Congenital factor VII deficiency is a challenging disorder to manage, as it is associated with varied genotypes that do not clinically correlate with a bleeding phenotype. Individuals with severe factor VII deficiency (FVII: c 5%) may experience severe hemorrhages. In modern medicine, due to extensive routine pre-operative laboratory testing, clinically asymptomatic patients without any bleeding history might be incidentally discovered, raising clinical dilemmas. Careful consideration of bleeding versus thrombosis risk has to be made in such cases, especially in the elderly. Clinical history of no prior bleeding complications may be a reassuring factor. Minimal required replacement dosing of recombinant activated factor VII can be given peri-operatively in such situations, with close monitoring.

  19. 29 CFR 1604.8 - Relationship of title VII to the Equal Pay Act.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Relationship of title VII to the Equal Pay Act. 1604.8... GUIDELINES ON DISCRIMINATION BECAUSE OF SEX § 1604.8 Relationship of title VII to the Equal Pay Act. (a) The... based on the Equal Pay Act may be raised in a proceeding under title VII. (c) Where such a defense is...

  20. Modelling Client Satisfaction Levels: The Impact of Contractor Performance

    Directory of Open Access Journals (Sweden)

    Robby Soetanto

    2012-11-01

    Full Text Available The performance of contractors is known to be a key determinant of client satisfaction.Here, using factor analysis, clients’ satisfaction is defined in several dimensions. Based onclients’ assessment of contractor performance, a number of satisfaction models developedusing the multiple regression (MR technique are presented. The models identify arange of variables encompassing contractor performance, project performance and respondent(i.e. client attributes as useful predictors of satisfaction levels. Contractor performanceattributes were found to be of utmost importance indicating that clientsatisfaction levels are mainly dependent on the performance of the contractor. Furthermore,findings suggest that subjectivity is to some extent prevalent in clients’ performanceassessment. The models demonstrate accurate and reliable predictive power as confirmedby validation tests. Contractors could use the models to help improve their performanceleading to more satisfied clients. This would also promote the development ofharmonious working relationships within the construction project coalition.

  1. 34 CFR 377.30 - What information must a grantee maintain and provide to the Secretary?

    Science.gov (United States)

    2010-07-01

    ... DEMONSTRATION PROJECTS TO INCREASE CLIENT CHOICE PROGRAM What Post-Award Conditions Must Be Met by a Grantee... maintain the records that the Secretary requires to conduct an evaluation of projects funded under this...

  2. 77 FR 6676 - Office of Inspector General; Contractor Requirements

    Science.gov (United States)

    2012-02-09

    ... POSTAL SERVICE 39 CFR Part 230 Office of Inspector General; Contractor Requirements AGENCY: Postal... for contractors employed by the Office of Inspector General. The rule also emphasizes consistency in contractor selection, and clarifies the OIG's exclusive authority to set qualifications and standards for its...

  3. Manipulation of the membrane binding site of vitamin K-dependent proteins: Enhanced biological function of human factor VII

    OpenAIRE

    Shah, Amit M.; Kisiel, Walter; Foster, Donald C.; Nelsestuen, Gary L.

    1998-01-01

    Recent studies suggested that modification of the membrane contact site of vitamin K-dependent proteins may enhance the membrane affinity and function of members of this protein family. The properties of a factor VII mutant, factor VII-Q10E32, relative to wild-type factor VII (VII, containing P10K32), have been compared. Membrane affinity of VII-Q10E32 was about 20-fold higher than that of wild-type factor VII. The rate of autoactivation VII-Q10E32 with soluble tissue factor was 100-fold fast...

  4. 76 FR 31892 - Recordkeeping and Reporting Requirements Under Title VII, the ADA, and GINA

    Science.gov (United States)

    2011-06-02

    ... Requirements Under Title VII, the ADA, and GINA AGENCY: Equal Employment Opportunity Commission. ACTION: Notice... Civil Rights Act of 1964 (Title VII) and the Americans with Disabilities Act (ADA) to entities covered... the same record retention requirements under GINA that are imposed under Title VII and the ADA, i.e...

  5. 48 CFR 970.0407 - Contractor records retention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor records retention. 970.0407 Section 970.0407 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0407 Contractor...

  6. 48 CFR 227.7108 - Contractor data repositories.

    Science.gov (United States)

    2010-10-01

    ... repositories. 227.7108 Section 227.7108 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Technical Data 227.7108 Contractor data repositories. (a) Contractor data repositories may be established when permitted by agency procedures. The contractual instrument establishing the data repository must...

  7. 75 FR 37815 - Agency Information Collection Activities: Two-Year Extension of an Existing Information...

    Science.gov (United States)

    2010-06-30

    ... health professions and nursing education and training programs. The reporting system measures the grantee... developed for the Bureau of Health Professions' Title VII and VIII health professions and nursing education... and Results Act (GPRA). The Bureau will be making minor changes to the previously approved information...

  8. 77 FR 12754 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2012-03-02

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... rulemaking (NOPR) to revise existing regulations covering contractor legal management requirements and make... relating to the DOE notice of proposed rulemaking to revise existing regulations covering contractor legal...

  9. 48 CFR 1252.237-70 - Qualifications of contractor employees.

    Science.gov (United States)

    2010-10-01

    ... contractor employees. 1252.237-70 Section 1252.237-70 Federal Acquisition Regulations System DEPARTMENT OF....237-70 Qualifications of contractor employees. As prescribed in (TAR) 48 CFR 1237.110(a), insert the following clause: Qualifications of Contractor Employees (APR 2005) a. Definitions. As used in this clause...

  10. 48 CFR 2452.237-75 - Clearance of contractor personnel.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Clearance of contractor... Clauses 2452.237-75 Clearance of contractor personnel. As prescribed in 2437.110(e), insert the following clause in solicitations and contracts. Clearance of Contractor Personnel (OCT 1999) (a) General. This...

  11. Wendelstein VII-A in torsatron mode

    International Nuclear Information System (INIS)

    Harmeyer, E.; Kisslinger, J.; Rau, F.; Wobig, H.

    1985-03-01

    Variable shear - positive or negative, up to about 20 percent - can be introduced into the Wendelstein VII-A Stellarator vacuum field configuration by different currents in the two helix systems, and balancing the resulting vertical field. (orig.)

  12. 76 FR 81408 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2011-12-28

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... Energy (DOE or Department) is proposing to revise existing regulations covering contractor legal... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  13. 78 FR 25795 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2013-05-03

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952, and 970 RIN 1990-AA37 Contractor Legal.... ACTION: Final rule. SUMMARY: The Department of Energy revises existing regulations covering contractor... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  14. 48 CFR 52.236-6 - Superintendence by the Contractor.

    Science.gov (United States)

    2010-10-01

    ... Contractor. 52.236-6 Section 52.236-6 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION....236-6 Superintendence by the Contractor. As prescribed in 36.506, insert the following clause: Superintendence by the Contractor (APR 1984) At all times during performance of this contract and until the work...

  15. Faktor-faktor Yang Memengaruhi Produksi Gula PTPN VII (Persero)

    OpenAIRE

    Savitri, Rizky; Widyastutik, Widyastutik

    2013-01-01

    This study aimed to analyze the influence of the level of sugar cane yield, labor, production process period, and supporting materials on the production of PTPN VII (Persero) PG. Cinta Manis, as well as analyzing the elasticity of production and business scale of PTPN VII (Persero) PG. Cinta Manis. The method used to analyze the data were quantitative analysis of Cobb Douglas production function with ordinary least square method to observe variable influences of PG. Cinta Manis sugar product...

  16. Report on the CSNI workshop on nuclear power plant transition from operation into decommissioning: human factors and organisation considerations

    International Nuclear Information System (INIS)

    2000-01-01

    The Senior Expert Group of the Committee on the Safety of Nuclear Installations (CSNI) proposed to Principal Working Group 1 (PWG1) of CSNI that a workshop be held to identify and discuss issues related to the impact of human factors and organisational aspects on decommissioning. This workshop was held in May 1999 in conjunction with the Joint NEA/IAEA/EC workshop on The Regulatory Aspects of Decommissioning. The workshop goals, as stated in the NEA Research Strategies for Human Performance, were 'to convene an information exchange meeting with interested Member countries in order to discuss areas of concern in this respect and identify possible areas that merit further research and their priorities'. The workshop highlighted a comparative lack of developed work in this area concerning the way in which organisational weaknesses can manifest themselves and how best to prevent or mitigate their effects. Eight key issues were identified and discussed by the participants. For each of the eight issues discussed by working groups, the potential risks of failing to address the Issue were identified. These potential risks formed a focal point for generating discussion about current experience and for drawing out gaps in current knowledge and understanding. From this base, participants then focused on specific types of information and questions that need further research in order to improve understanding and successful implementation of the transition from operations to decommissioning. The eight issues and suggested high priority needs are: - Creating a system to share international experience: Establish improved methods for obtaining and sharing information and experience on a regular basis in order to identify organisational and human factors issues, good practices and lessons learned as regulators and utilities deal with decommissioning. - Organisational memory and competence: Identify effective approaches to retain expertise during the transition from operations to

  17. Coagulation factor VII is regulated by androgen receptor in breast cancer.

    Science.gov (United States)

    Naderi, Ali

    2015-02-01

    Androgen receptor (AR) is widely expressed in breast cancer; however, there is limited information on the key molecular functions and gene targets of AR in this disease. In this study, gene expression data from a cohort of 52 breast cancer cell lines was analyzed to identify a network of AR co-expressed genes. A total of 300 genes, which were significantly enriched for cell cycle and metabolic functions, showed absolute correlation coefficients (|CC|) of more than 0.5 with AR expression across the dataset. In this network, a subset of 35 "AR-signature" genes were highly co-expressed with AR (|CC|>0.6) that included transcriptional regulators PATZ1, NFATC4, and SPDEF. Furthermore, gene encoding coagulation factor VII (F7) demonstrated the closest expression pattern with AR (CC=0.716) in the dataset and factor VII protein expression was significantly associated to that of AR in a cohort of 209 breast tumors. Moreover, functional studies demonstrated that AR activation results in the induction of factor VII expression at both transcript and protein levels and AR directly binds to a proximal region of F7 promoter in breast cancer cells. Importantly, AR activation in breast cancer cells induced endogenous factor VII activity to convert factor X to Xa in conjunction with tissue factor. In summary, F7 is a novel AR target gene and AR activation regulates the ectopic expression and activity of factor VII in breast cancer cells. These findings have functional implications in the pathobiology of thromboembolic events and regulation of factor VII/tissue factor signaling in breast cancer. Copyright © 2014 Elsevier Inc. All rights reserved.

  18. 76 FR 31416 - Federal Acquisition Regulation; Oversight of Contractor Ethics Programs

    Science.gov (United States)

    2011-05-31

    ...-AL92 Federal Acquisition Regulation; Oversight of Contractor Ethics Programs AGENCY: Department of... that contractors have implemented the mandatory contractor business ethics program requirements. DATES... to Improve DoD's Oversight of Contractor Ethics Programs. The ethics program requirement flows from...

  19. Photosynthetic pigments of oceanic Chlorophyta belonging to prasinophytes clade VII.

    Science.gov (United States)

    Lopes Dos Santos, Adriana; Gourvil, Priscillia; Rodríguez, Francisco; Garrido, José Luis; Vaulot, Daniel

    2016-02-01

    The ecological importance and diversity of pico/nanoplanktonic algae remains poorly studied in marine waters, in part because many are tiny and without distinctive morphological features. Amongst green algae, Mamiellophyceae such as Micromonas or Bathycoccus are dominant in coastal waters while prasinophytes clade VII, yet not formerly described, appear to be major players in open oceanic waters. The pigment composition of 14 strains representative of different subclades of clade VII was analyzed using a method that improves the separation of loroxanthin and neoxanthin. All the prasinophytes clade VII analyzed here showed a pigment composition similar to that previously reported for RCC287 corresponding to pigment group prasino-2A. However, we detected in addition astaxanthin for which it is the first report in prasinophytes. Among the strains analyzed, the pigment signature is qualitatively similar within subclades A and B. By contrast, RCC3402 from subclade C (Picocystis) lacks loroxanthin, astaxanthin, and antheraxanthin but contains alloxanthin, diatoxanthin, and monadoxanthin that are usually found in diatoms or cryptophytes. For subclades A and B, loroxanthin was lowest at highest light irradiance suggesting a light-harvesting role of this pigment in clade VII as in Tetraselmis. © 2015 Phycological Society of America.

  20. 48 CFR 1437.7001 - Contractor qualification requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor qualification requirements. 1437.7001 Section 1437.7001 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... Contractor qualification requirements. (a) Prior to award of a contract for real property appraisal services...

  1. 76 FR 79065 - Recordkeeping and Reporting Requirements Under Title VII, the ADA and GINA

    Science.gov (United States)

    2011-12-21

    ... Reporting Requirements Under Title VII, the ADA and GINA CFR Correction In Title 29 of the Code of Federal... title VII or section 107 of the ADA'' and add in their place the words ``section 709(c) of title VII, section 107 of the ADA, or section 207(a) of GINA'' wherever they appear in the following sections...

  2. Advantages of the production contractor concept

    Energy Technology Data Exchange (ETDEWEB)

    Gisvold, K.M. [Golar-Nor Offshore, Trondheim (Norway)

    1994-12-31

    This paper presents some thoughts on the Production Contractor concept. It starts with an attempt to define the prerequisites for such contractorship to exist and develop, going on to examine the considerations that the oil company and the contractor respectively have to go through, and finally trying to summarize what emerges as the advantages of production contracting. Examples are given to emphasize particular points

  3. Advantages of the production contractor concept

    International Nuclear Information System (INIS)

    Gisvold, K.M.

    1994-01-01

    This paper presents some thoughts on the Production Contractor concept. It starts with an attempt to define the prerequisites for such contractorship to exist and develop, going on to examine the considerations that the oil company and the contractor respectively have to go through, and finally trying to summarize what emerges as the advantages of production contracting. Examples are given to emphasize particular points

  4. Tissue Factor–Factor VII Complex As a Key Regulator of Ovarian Cancer Phenotypes

    OpenAIRE

    Koizume, Shiro; Miyagi, Yohei

    2015-01-01

    Tissue factor (TF) is an integral membrane protein widely expressed in normal human cells. Blood coagulation factor VII (fVII) is a key enzyme in the extrinsic coagulation cascade that is predominantly secreted by hepatocytes and released into the bloodstream. The TF–fVII complex is aberrantly expressed on the surface of cancer cells, including ovarian cancer cells. This procoagulant complex can initiate intracellular signaling mechanisms, resulting in malignant phenotypes. Cancer tissues are...

  5. 14 CFR 1274.402 - Contractor acquired property.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Contractor acquired property. 1274.402 Section 1274.402 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Property § 1274.402 Contractor acquired property. As provided in § 1274.923...

  6. 48 CFR 1646.301 - Contractor inspection requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor inspection requirements. 1646.301 Section 1646.301 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Clauses 1646.301 Contractor inspection requirements. The clause set forth at 1652.246-70 shall be inserted...

  7. 48 CFR 645.608 - Screening of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... inventory. 645.608 Section 645.608 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 645.608 Screening of contractor inventory. ...

  8. Coagulation factor VII, serum-triglycerides and the R/Q353 polymorphism: differences between older men and women

    NARCIS (Netherlands)

    Mennen, L. I.; de Maat, M. P.; Schouten, E. G.; Kluft, C.; de Jong, P. T.; Hofman, A.; Grobbee, D. E.

    1997-01-01

    Coagulation factor VII activity (FVII:C) is a risk indicator for cardiovascular disease. It is related to serum-triglycerides and the R/Q353 polymorphism (alleles R and Q) in the gene coding for factor VII is strongly associated with factor VII. The association of serum-triglycerides with factor VII

  9. Contractors on the Battlefield: Planning Considerations and Requirements

    National Research Council Canada - National Science Library

    2002-01-01

    Contractors on the Battlefield: Planning Considerations and Requirements introduces the basics and foundation for those who want to learn about the history, terminology, and process for obtaining contractor support on the battlefield...

  10. Self-production of tissue factor-coagulation factor VII complex by ovarian cancer cells

    OpenAIRE

    Yokota, N; Koizume, S; Miyagi, E; Hirahara, F; Nakamura, Y; Kikuchi, K; Ruf, W; Sakuma, Y; Tsuchiya, E; Miyagi, Y

    2009-01-01

    Background: Thromboembolic events are a major complication in ovarian cancer patients. Tissue factor (TF) is frequently overexpressed in ovarian cancer tissue and correlates with intravascular thrombosis. TF binds to coagulation factor VII (fVII), changing it to its active form, fVIIa. This leads to activation of the extrinsic coagulation cascade. fVII is produced by the liver and believed to be supplied from blood plasma at the site of coagulation. However, we recently showed that ovarian ca...

  11. Rapporteur's Report of the Workshop on Radiological Characterisation for Decommissioning

    International Nuclear Information System (INIS)

    Thierfeldt, Stefan

    2012-01-01

    In April 2012, the Nuclear Energy Agency, in co-operation with Studsvik Nuclear AB, the Swedish Radiation Safety Authority (SSM), Swedish Nuclear Fuel and Waste Management Company (SKB) and AB SVAFO, held a Workshop on Radiological Characterisation in Decommissioning in Studsvik near Nykoeping (Sweden). During three days, a wide range of presentations, posters, discussions and site visits brought together over 120 participants from 23 countries and 4 international organisations, the IAEA, the WNA, the European Commission and the OECD/NEA. Members of the Task Group on Radiological Characterisation for Decommissioning (RCD) of the WPDD were involved in the preparation of the workshop. Many decommissioning projects of all types of nuclear installations have progressed substantially and/or have been completed to brown field or green field conditions, so that it was the right time to bring together operators, regulators, scientists, consultants and contractors to exchange information and views and to evaluate the information on radiological characterisation gained from this multitude of projects. The outcome will be valuable for the large number of decommissioning projects about to start in the near future. The Workshop consisted of 5 topical sessions and a poster session. The topical sessions were complemented by discussions in the plenary and in smaller groups. This report provides a short summary of the various presentations and discussions. It concentrates on the outcome of the presentations, posters and discussions than giving an account of the spoken word

  12. 78 FR 1256 - Guam Military Base Realignment Contractor Recruitment Standards

    Science.gov (United States)

    2013-01-08

    ... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Final notice... issuing this notice to announce recruitment standards that construction contractors are required to follow... B) by adding a new subsection (6). This provision prohibits contractors engaged in construction...

  13. 77 FR 3503 - Guam Military Base Realignment Contractor Recruitment Standards

    Science.gov (United States)

    2012-01-24

    ... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Notice... issuing this notice to announce the recruitment standards that construction contractors are required to... contractors engaged in construction projects related to the realignment of U.S. military forces from Okinawa...

  14. Factor VII deficiency: a novel missense variant and genotype-phenotype correlation in patients from Southern Italy.

    Science.gov (United States)

    Tiscia, Giovanni; Favuzzi, Giovanni; Chinni, Elena; Colaizzo, Donatella; Fischetti, Lucia; Intrieri, Mariano; Margaglione, Maurizio; Grandone, Elvira

    2017-01-01

    This study aimed at attempting to correlate genotype and phenotype in factor VII deficiency. Here, we present molecular and clinical findings of 10 patients with factor VII deficiency. From 2013 to 2016, 10 subjects were referred to our center because of a prolonged prothrombin time identified during routine or presurgery examinations or after a laboratory assessment of a bleeding episode. Mutation characterization was performed using the bioinformatics applications PROMO, SIFT, and Polyphen-2. Structural changes in the factor VII protein were analyzed using the SPDB viewer tool. Of the 10 variants we identified, 1 was responsible for a novel missense change (c.1199G>C, p.Cys400Ser); in 2 cases we identified the c.-54G>A and c.509G>A (p.Arg170His) polymorphic variants in the 5'-upstream region of the factor VII gene and exon 6, respectively. To our knowledge, neither of these polymorphic variants has been described previously in factor VII-deficient patients. In silico predictions showed differences in binding sites for transcription factors caused by the c.-54G>A variant and a probable damaging effect of the p.Cys400Ser missense change on factor VII active conformation, leading to breaking of the Cys400-Cys428 disulfide bridge. Our findings further suggest that, independently of factor VII levels and of variants potentially affecting factor VII levels, environmental factors, e.g., trauma, could heavily influence the clinical phenotype of factor VII-deficient patients.

  15. Self-production of tissue factor-coagulation factor VII complex by ovarian cancer cells.

    Science.gov (United States)

    Yokota, N; Koizume, S; Miyagi, E; Hirahara, F; Nakamura, Y; Kikuchi, K; Ruf, W; Sakuma, Y; Tsuchiya, E; Miyagi, Y

    2009-12-15

    Thromboembolic events are a major complication in ovarian cancer patients. Tissue factor (TF) is frequently overexpressed in ovarian cancer tissue and correlates with intravascular thrombosis. TF binds to coagulation factor VII (fVII), changing it to its active form, fVIIa. This leads to activation of the extrinsic coagulation cascade. fVII is produced by the liver and believed to be supplied from blood plasma at the site of coagulation. However, we recently showed that ovarian cancer cells express fVII transcripts under normoxia and that this transcription is inducible under hypoxia. These findings led us to hypothesise that ovarian cancer cells are intrinsically associated with TF-fVIIa coagulation activity, which could result in thrombosis. In this study, we examined whether ectopically expressed fVII could cause thrombosis by means of immunohistochemistry, RT-PCR, western blotting and flow cytometry. Ectopic fVII expression occurs frequently in ovarian cancers, particularly in clear cell carcinoma. We further showed that ovarian cancer cells express TF-fVIIa on the cell surface under normoxia and that this procoagulant activity is enhanced by hypoxic stimuli. Moreover, we showed that ovarian cancer cells secrete microparticles (MPs) with TF-fVIIa activity. Production of this procoagulant secretion is enhanced under hypoxia. These results raise the possibility that cancer cell-derived TF-fVIIa could cause thrombotic events in ovarian cancer patients.

  16. Accounting calculations problems with suppliers and contractors

    Directory of Open Access Journals (Sweden)

    Tikholaz I.A.

    2016-12-01

    Full Text Available in the article an order of accounting reflection of payments with suppliers and contractors are researched and ways of enhancement of accounting calculations process development with the purpose of management decisions optimization for their implementation are offered. Theoretical bases of intraeconomic control of settlings with suppliers and contractors are developed.

  17. National Radon Contractor Proficiency (RCP) Program. Proficiency report, June 1991

    International Nuclear Information System (INIS)

    1991-06-01

    The primary objective of the U.S. Environmental Protection Agency's (EPA) efforts to address the indoor radon problem is to reduce radon levels in buildings throughout the country. Achieving the objective requires a nationwide supply of capable radon mitigation contractors. In the Indoor Radon Abatement Act of 1988, Congress authorized EPA to establish a program to evaluate radon mitigation contractors and to provide the information to the public in cooperation with the States. The Radon Contractor Proficiency (RCP) Program was developed to assist States, EPA Regions, local government officials, and the public in selecting contractors who have demonstrated their proficiency in reducing indoor radon levels. The program is managed by the EPA Office of Radiation Programs' Radon Division. Under the voluntary program, radon contractors demonstrate their proficiency by meeting specific Program requirements. Individual contractors who meet these requirements are then listed in periodic RCP Proficiency Reports

  18. National Radon Contractor Proficiency (RCP) program. Proficiency report, September 1991

    International Nuclear Information System (INIS)

    1991-09-01

    The primary objective of the U.S. Environmental Protection Agency's (EPA) efforts to address the indoor radon problem is to reduce radon levels in buildings throughout the country. Achieving this objective requires a nationwide supply of capable radon mitigation contractors. In the Indoor Radon Abatement Act of 1988, Congress authorized EPA to establish a program to evaluate radon mitigation contractors and to provide this information to the public in cooperation with the States. The Radon Contractor Proficiency (RCP) Program was developed to assist States, EPA Regions, local government officials, and the public in selecting contractors who have demonstrated their proficiency in reducing indoor radon levels. The program is managed by the EPA Office of Radiation Programs' Radon Division. Under this voluntary program, radon contractors demonstrate their proficiency by meeting specific Program requirements. Individual contractors who meet these requirements are then listed in the Report

  19. National Radon Contractor Proficiency (RCP) Program. Proficiency report, January 1992

    International Nuclear Information System (INIS)

    1992-01-01

    The primary objective of the U.S. Environmental Protection Agency's (EPA) efforts to address the indoor radon problem is to reduce radon levels in buildings throughout the country. Achieving the objective requires a nationwide supply of capable radon mitigation contractors. In the Indoor Radon Abatement Act of 1988, Congress authorized EPA to establish a program to evaluate radon mitigation contractors and to provide the information to the public in cooperation with the States. The Radon Contractor Proficiency (RCP) Program was developed to assist States, EPA Regions, local government officials, and the public in selecting contractors who have demonstrated their proficiency in reducing indoor radon levels. The program is managed by the EPA Office of Radiation Programs' Radon Division. Under the voluntary program, radon contractors demonstrate their proficiency by meeting specific Program requirements. Individual contractors who meet these requirements are then listed in the Report

  20. 48 CFR 1403.570 - Restrictions on contractor advertising.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Restrictions on contractor advertising. 1403.570 Section 1403.570 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... 1403.570 Restrictions on contractor advertising. ...

  1. 76 FR 48776 - Federal Acquisition Regulation; Documenting Contractor Performance; Correction

    Science.gov (United States)

    2011-08-09

    ... Regulation; Documenting Contractor Performance; Correction AGENCY: Department of Defense (DoD), General... published in the Federal Register of June 28, 2011, regarding the proposed rule for Documenting Contractor... published in the Federal Register of June 28, 2011, regarding the proposed rule for Documenting Contractor...

  2. 42 CFR 405.874 - Appeals of CMS or a CMS contractor.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Appeals of CMS or a CMS contractor. 405.874 Section... Part B Program § 405.874 Appeals of CMS or a CMS contractor. A CMS contractor's (that is, a carrier... supplier enrollment application. If CMS or a CMS contractor denies a provider's or supplier's enrollment...

  3. Prophylaxis in congenital factor VII deficiency: indications, efficacy and safety. Results from the Seven Treatment Evaluation Registry (STER).

    Science.gov (United States)

    Napolitano, Mariasanta; Giansily-Blaizot, Muriel; Dolce, Alberto; Schved, Jean F; Auerswald, Guenter; Ingerslev, Jørgen; Bjerre, Jens; Altisent, Carmen; Charoenkwan, Pimlak; Michaels, Lisa; Chuansumrit, Ampaiwan; Di Minno, Giovanni; Caliskan, Umran; Mariani, Guglielmo

    2013-04-01

    Because of the very short half-life of factor VII, prophylaxis in factor VII deficiency is considered a difficult endeavor. The clinical efficacy and safety of prophylactic regimens, and indications for their use, were evaluated in factor VII-deficient patients in the Seven Treatment Evaluation Registry. Prophylaxis data (38 courses) were analyzed from 34 patients with severe factor VII deficiency (factor VII (24 courses), four received plasma-derived factor VII, and ten received fresh frozen plasma. Prophylactic schedules clustered into "frequent" courses (three times weekly, n=23) and "infrequent" courses (≤ 2 times weekly, n=15). Excluding courses for menorrhagia, "frequent" and "infrequent" courses produced 18/23 (78%) and 5/12 (41%) "excellent" outcomes, respectively; relative risk, 1.88; 95% confidence interval, 0.93-3.79; P=0.079. Long term prophylaxis lasted from 1 to >10 years. No thrombosis or new inhibitors occurred. In conclusion, a subset of patients with factor VII deficiency needed prophylaxis because of severe bleeding. Recombinant activated factor VII schedules based on "frequent" administrations (three times weekly) and a 90 μg/kg total weekly dose were effective. These data provide a rationale for long-term, safe prophylaxis in factor VII deficiency.

  4. 48 CFR 2804.470 - Contractor Personnel Security Program.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Personnel Security Program. 2804.470 Section 2804.470 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE General ADMINISTRATIVE MATTERS Safeguarding Classified Information Within Industry 2804.470 Contractor...

  5. 13 CFR 143.12 - Special grant or subgrant conditions for “high-risk” grantees.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Special grant or subgrant conditions for âhigh-riskâ grantees. 143.12 Section 143.12 Business Credit and Assistance SMALL BUSINESS... or subgrantee: (1) Has a history of unsatisfactory performance, or (2) Is not financially stable, or...

  6. 28 CFR 90.106 - What are the grantee reporting requirements for the grant program?

    Science.gov (United States)

    2010-07-01

    ..., Violence Against Women Office) and the Secretary of Education (U.S. Department of Education's Safe and Drug... (CONTINUED) VIOLENCE AGAINST WOMEN Grants To Combat Violent Crimes Against Women on Campuses § 90.106 What..., Violence Against Women Office). Funding shall be suspended if a grantee fails to submit an annual...

  7. 29 CFR 500.60 - Farm labor contractors' recruitment, contractual and general obligations.

    Science.gov (United States)

    2010-07-01

    ... labor contractors' recruitment, contractual and general obligations. The Act imposes certain specific recruitment, contractual and general obligations on farm labor contractors and farm labor contractor employees... 29 Labor 3 2010-07-01 2010-07-01 false Farm labor contractors' recruitment, contractual and...

  8. Correction of murine mucopolysaccharidosis VII by a human. beta. -glucuronidase transgene

    Energy Technology Data Exchange (ETDEWEB)

    Kyle, J.W.; Vogler, C.; Hoffmann, J.W.; Sly, W.S. (St. Louis Univ. School of Medicine, MO (USA)); Birkenmeier, E.H.; Gwynn, B. (Jackson Laboratory, Bar Harbor, ME (USA))

    1990-05-01

    The authors recently described a murine model for mucopolysaccharidosis VII in mice that have an inherited deficiency of {beta}-glucuronidase. Affected mice, of genotype gus{sup mps}/gus{sup mps}, present clinical manifestations similar to those of humans with mucopolysaccharidosis VII (Sly syndrome) and are shown here to have secondary elevations of other lysosomal enzymes. The mucopolysaccharidosis VII phenotype in both species includes dwarfism, skeletal deformities, and premature death. Lysosome storage is visualized within enlarged vesicles and correlates biochemically with accumulation of undegraded and partially degraded glycosaminoglycans. In this report they describe the consequences of introducing the human {beta}-glucuronidase gene, GUSB, into gus{sup mps}/gus{sup mps} mice that produce virtually no murine {beta}-glucuronidase. Transgenic mice homozygous for the mucopolysaccharidosis VII mutation expressed high levels of human {beta}-glucuronidase activity in all tissues examined and were phenotypically normal. Biochemically, both the intralysosomal storage of glycosaminoglycans and the secondary elevation of other acid hydrolases were corrected. These findings demonstrate that the GUSB transgene is expressed in gus{sup mps}/gus{sup mps} mice and that human {beta}-glucuronidase corrects the murine mucopolysaccharidosis storage disease.

  9. Plasma factor VII-activating protease is increased by oral contraceptives and induces factor VII activation in-vivo

    DEFF Research Database (Denmark)

    Sidelmann, Johannes Jakobsen; Skouby, Sven O.; Kluft, Cornelis

    2011-01-01

    progestins. FSAP genotypes, FSAP and factor VII (FVII) plasma measures were assessed at baseline and after 6 cycles of OC. The 1601GA genotype was present in 49 (8.3%) of the women and was associated with significantly reduced levels of FSAP (P≤0.001). OC use increased FSAP antigen by 25% and FSAP activity......Oral contraceptive (OC) use influences the hemostatic system significantly and is a risk factor for development of cardiovascular disease. Factor VII-activating protease (FSAP) has potential effects on hemostasis. The 1601GA genotype of the 1601G/A polymorphism in the FSAP gene expresses a FSAP...... by 59% (P0.05). The relative increase in FSAP activity was significantly higher in women carrying the 1601GG genotype (63%) than in women carrying 1601GA genotype (50%) (P=0.01) and was associated with an increased activation of FVII. In conclusion: OC use increases the plasma measures of FSAP...

  10. The Department of Energy`s Rocky Flats Plant: A guide to record series useful for health-related research. Volume VII. Employee occupational exposure and health

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This is the seventh in a series of seven volumes which constitute a guide to records of the Rocky Flats Plant useful for conducting health-related research. The primary purpose of Volume VII is to describe record series pertaining to employee occupational exposure and health at the Department of Energy`s (DOE) Rocky Flats Plant, now named the Rocky Flats Environmental Technology Site, near Denver, Colorado. History Associates Incorporated (HAI) prepared this guide as part of its work as the support services contractor for DOE`s Epidemiologic Records Inventory Project. This introduction briefly describes the Epidemiologic Records Inventory Project and HAI`s role in the project, provides a history of occupational exposure monitoring and health practices at Rocky Flats, and identifies organizations contributing to occupational exposure monitoring and health policies and activities. Other topics include the scope and arrangement of the guide and the organization to contact for access to these records. Comprehensive introductory and background information is available in Volume 1. Other volumes in the guide pertain to administrative and general subjects, facilities and equipment, production and materials handling, environmental and workplace monitoring, and waste management. In addition, HAI has produced a subject-specific guide, titled The September 1957 Rocky Flats Fire: A Guide to Record Series of the Department of Energy and Its Contractors, which researchers should consult for further information about records related to this incident.

  11. Selection and assessment of contractors; Auswahl und Beurteilung von Auftragnehmerfirmen

    Energy Technology Data Exchange (ETDEWEB)

    Lier, K.H. [ExxonMobil Production Deutschland GmbH, Hannover (Germany)

    2007-09-13

    Reliable and efficient contractors are important for the activities of ExxonMobil. Qualification of contractors is to ensure that contractors provide technical services in accordance with the specifications of ExxonMobil. Apart from the financial, oranisational and legal qualification this covers technical qualification, i.e. industrial safety, health protection and environmental protection, as well as technical efficiency and quality. The ultimate intention is to find out if contractors have the processes and systems at their disposal that are required for the services. The qualification process is described. (orig.)

  12. 40 CFR Appendix Vii to Part 268 - LDR Effective Dates of Surface Disposed Prohibited Hazardous Wastes

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false LDR Effective Dates of Surface Disposed Prohibited Hazardous Wastes VII Appendix VII to Part 268 Protection of Environment ENVIRONMENTAL... VII to Part 268—LDR Effective Dates of Surface Disposed Prohibited Hazardous Wastes Table 1—Effective...

  13. Information technology boosts contractor's economic success

    International Nuclear Information System (INIS)

    Penny, M.; Vasey, G.M.

    1995-01-01

    This article will discuss the advantages of Information Technology (IT) and how one drilling contractor, Global Marine, has applied this technology. The company has applied it in an efficient manner which has provided business benefits and cost reductions that have helped its operations be more successful. The following are the different aspects of information technology that led to the contractor's success: cost reduction measures; migration to a client/server IT infrastructure; IT business benefits; and keys to obtaining business benefits from IT

  14. Proceedings of the Department of Energy Defense Programs hazardous and mixed waste minimization workshop: Hazardous Waste Remedial Actions Program

    International Nuclear Information System (INIS)

    1988-09-01

    The first workshop on hazardous and mixed waste minimization was held in Las Vegas, Nevada, on July 26--28, 1988. The objective of this workshop was to establish an interchange between DOE headquarters (DOE-HQ) DP, Operations Offices, and contractors of waste minimization strategies and successes. The first day of the workshop began with presentations stressing the importance of establishing a waste minimization program at each site as required by RCRA, the land ban restrictions, and the decrease in potential liabilities associated with waste disposal. Discussions were also centered on pending legislation which would create an Office of Waste Reduction in the Environmental Protection Agency (EPA). The Waste Minimization and Avoidance Study was initiated by DOE as an addition to the long-term productivity study to address the issues of evolving requirements facing RCRA waste management activities at the DP sites, to determine how major operations will be affected by these requirements, and to determine the available strategies and options for waste minimization and avoidance. Waste minimization was defined in this study as source reduction and recycling

  15. Contractor Selection for Enhancing the Quality of University ...

    African Journals Online (AJOL)

    Contractor Selection for Enhancing the Quality of University Education in Nigeria using the Hamming Distance. DEA Omorogbe, SO Aibieyi. Abstract. The need for contractor selection in our university education system cannot be over emphasized. And applying scientific techniques for appropriateness and accuracy in the ...

  16. 48 CFR 36.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Evaluation of contractor performance. 36.201 Section 36.201 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Contracting for Construction 36.201 Evaluation of contractor performance. See 42.1502(e) for the requirements...

  17. 48 CFR 49.405 - Completion by another contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Completion by another contractor. 49.405 Section 49.405 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... contractor. If the surety does not arrange for completion of the contract, the contracting officer normally...

  18. Fiscal Liability of State Contractors

    Directory of Open Access Journals (Sweden)

    Santiago Fajardo-Peña

    2017-06-01

    Full Text Available The State contract is one of the most important tools for public management. The formation, execution and liquidation of State contracts are also a potential cause of State patrimonial damages. Perhaps for this reason, many State contractors are prosecuted as if they were public spending managers. The question, however, is not as simple. The fiscal liability process has a qualified recipient: the fiscal manager. In this article, through a conceptual exposition and a case study, we identify the criterion for determining in which cases a State contractor acquires the function of controlling public funds and when he/she can be subjected to a fiscal liability.

  19. FY 2000 Saltcake Dissolution and Feed Stability Workshop

    International Nuclear Information System (INIS)

    Hunt, R.D.; McGinnis, C.P.; Weber, C.F.; Welch, T.D.; Jewett, J.R.

    2000-01-01

    The Tanks Focus Area (TFA) continues to work closely with the Office of River Protection (ORP) to better understand the chemistry involved with the retrieval, transport, and pretreatment of nuclear wastes at Hanford. Since a private contractor is currently responsible for the pretreatment and immobilization activities in this remediation effort, the TFA has concentrated on saltcake dissolution and waste transport at the request of the ORP. Researchers at Hanford have performed a series of dissolution experiments on actual saltcake samples. Staff members at Mississippi State University (MSU) continue to model the dissolution results with the Environmental Simulation Program (ESP), which is used extensively by ORP personnel. Several ways to improve the predictive capabilities of the ESP were identified. Since several transfer lines at Hanford have become plugged, TFA tasks at AEA Technologies, Florida International University (FIU), MSU, and Oak Ridge National Laboratory (ORNL) are investigating the behavior of the supernatants and slurries during transport. A combination of experimental and theoretical techniques is used to study the transport chemistry. This effort is expected to develop process control tools for waste transfer. The results from these TFA tasks were presented to ORP personnel during the FY 2000 Saltcake Dissolution and Feed Stability Workshop, which was held on May 16-17 in Richland, Washington. The minutes from this workshop are provided in this report

  20. 77 FR 43078 - Federal Acquisition Regulation; Information Collection; Central Contractor Registration

    Science.gov (United States)

    2012-07-23

    ...; Information Collection; Central Contractor Registration AGENCY: Department of Defense (DOD), General Services... requirement concerning the Central Contractor Registration database. Public comments are particularly invited... Information Collection 9000- 0159, Central Contractor Registration, by any of the following methods...

  1. Gene disruption reveals a dispensable role for plasmepsin VII in the Plasmodium berghei life cycle.

    Science.gov (United States)

    Mastan, Babu S; Kumari, Anchala; Gupta, Dinesh; Mishra, Satish; Kumar, Kota Arun

    2014-06-01

    Plasmepsins (PM), aspartic proteases of Plasmodium, comprises a family of ten proteins that perform critical functions in Plasmodium life cycle. Except VII and VIII, functions of the remaining plasmepsin members have been well characterized. Here, we have generated a mutant parasite lacking PM VII in Plasmodium berghei using reverse genetics approach. Systematic comparison of growth kinetics and infection in both mosquito and vertebrate host revealed that PM VII depleted mutants exhibited no defects in development and progressed normally throughout the parasite life cycle. These studies suggest a dispensable role for PM VII in Plasmodium berghei life cycle. Copyright © 2014 Elsevier B.V. All rights reserved.

  2. 78 FR 12316 - Federal Acquisition Regulation; Information Collection; Central Contractor Registration

    Science.gov (United States)

    2013-02-22

    ...; Information Collection; Central Contractor Registration AGENCIES: Department of Defense (DOD), General... collection requirement concerning the Central Contractor Registration database. A notice was published in the... Information Collection 9000- 0159, Central Contractor Registration, by any of the following methods...

  3. 20 CFR 641.540 - What types of training may grantees/subgrantees provide to SCSEP participants?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What types of training may grantees/subgrantees provide to SCSEP participants? 641.540 Section 641.540 Employees' Benefits EMPLOYMENT AND TRAINING... prevents or limits participants from engaging in self-development training available through other sources...

  4. 78 FR 46999 - Additional Waivers and Alternative Requirements for Hurricane Sandy Grantees in Receipt of...

    Science.gov (United States)

    2013-08-02

    ... Speech-impaired individuals may access this number through TTY by calling the toll-free Federal Relay...-401-2044. (Except for the ``800'' number, these telephone numbers are not toll-free.) Email inquiries... the cost of living, including home values) in these entitlement grantees are significantly higher than...

  5. 78 FR 20087 - Privacy Act of 1974; Proposed New System of Records

    Science.gov (United States)

    2013-04-03

    ... information (for market agencies selling on commission), bond information, and information registered entities... Archives and Records Administration; contractors, grantees, experts, consultants, or volunteers; and/or... individuals that are regulated under the P&S Act, which include stockyard owners, market agencies, dealers...

  6. Configuration Management Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    WEIR, W.R.

    2000-01-01

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments

  7. Configuration Management Plan for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  8. Optimal Contractor Selection in Construction Industry: The Fuzzy Way

    Science.gov (United States)

    Krishna Rao, M. V.; Kumar, V. S. S.; Rathish Kumar, P.

    2018-02-01

    A purely price-based approach to contractor selection has been identified as the root cause for many serious project delivery problems. Therefore, the capability of the contractor to execute the project should be evaluated using a multiple set of selection criteria including reputation, past performance, performance potential, financial soundness and other project specific criteria. An industry-wide questionnaire survey was conducted with the objective of identifying the important criteria for adoption in the selection process. In this work, a fuzzy set based model was developed for contractor prequalification/evaluation, by using effective criteria obtained from the percept of construction professionals, taking subjective judgments of decision makers also into consideration. A case study consisting of four alternatives (contractors in the present case) solicited from a public works department of Pondicherry in India, is used to illustrate the effectiveness of the proposed approach. The final selection of contractor is made based on the integrated score or Overall Evaluation Score of the decision alternative in prequalification as well as bid evaluation stages.

  9. 21 CFR 1403.12 - Special grant or subgrant conditions for “high-risk” grantees.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Special grant or subgrant conditions for âhigh-riskâ grantees. 1403.12 Section 1403.12 Food and Drugs OFFICE OF NATIONAL DRUG CONTROL POLICY UNIFORM...) Has a history of unsatisfactory performance, or (2) Is not financially stable, or (3) Has a management...

  10. Activation of factor VII bound to tissue factor: A key early step in the tissue factor pathway of blood coagulation

    International Nuclear Information System (INIS)

    Rao, L.V.M.; Rapaport, S.I.

    1988-01-01

    Whether the factor VII/tissue factor complex that forms in tissue factor-dependent blood coagulation must be activated to factor VIIa/tissue factor before it can activate its substrates, factor X and IX, has been a difficult question to answer because the substrates, once activated, back-activate factor VII. The earlier studies suggested that human factor VII/tissue factor cannot activate factor IX. Studies have now been extended to the activation of factor X. Reaction mixtures were made with purified factor VII, X, and tissue factor; in some experiments antithrombin III and heparin were added to prevent back-activation of factor VII. Factor X was activated at similar rates in reaction mixtures containing either VII or factor VIIa after an initial 30-sec lag with factor VII. In reaction mixtures with factor VII a linear activation of factor X was established several minutes before cleavage of 125 I-labeled factor VII to the two-chain activated molecule was demonstrable on gel profiles. These data suggest that factor VII/tissue factor cannot activate measurable amounts of factor X over several minutes. Overall, the results support the hypothesis that a rapid preferential activation of factor VII bound to tissue factor by trace amounts of factor Xa is a key early step in tissue factor-dependent blood coagulation

  11. Synthesis, purification, and characterization of an Arg152 → Glu site-directed mutant of recombinant human blood clotting factor VII

    International Nuclear Information System (INIS)

    Wildgoose, P.; Kisiel, W.; Berkner, K.L.

    1990-01-01

    Coagulation factor VII circulates in blood as a single-chain zymogen of a serine protease and is converted to its activated two-chain form, factor VIIa, by cleavage of an internal peptide bond located at Arg 152 -Ile 153 . Previous studies using serine protease active-site inhibitors suggest that zymogen factor VII may possess sufficient proteolytic activity to initiate the extrinsic pathway of blood coagulation. In order to assess the putative intrinsic proteolytic activity of single-chain factor VII, the authors have constructed a site-specific mutant of recombinant human factor VII in which arginine-152 has been replaced with a glutamic acid residue. Mutant factor VII was purified in a single step from culture supernatants of baby hamster kidney cells transfected with a plasmid containing the sequence for Arg 152 → Glu factor VII using a calcium-dependent, murine anti-factor VII monoclonal antibody column. The clotting activity of mutant factor VII was completely inhibited following incubation with dansyl-Glu-Gly-Arg chloromethyl ketone, suggesting that the apparent clotting activity of mutant factor VII was due to a contaminating serine protease. Immunoblots of mutant factor VII with human factor IXa revealed no cleavage, whereas incubation of mutant factor VII with human factor Xa resulted in cleavage of mutant factor VII and the formation of a lower molecular weight degradation product migrating at M r ∼40 000. The results are consistent with the proposal that zymogen factor VII possesses no intrinsic proteolytic activity toward factor X or factor IX

  12. First year evaluation of EPA's radon contractor proficiency (RCP) program

    International Nuclear Information System (INIS)

    Salmon, G.L.

    1990-01-01

    This paper reports that the Environmental Protection Agency (EPA) has developed a voluntary program to evaluate radon reduction contractors and provide this information to the public, as part of activities mandated by the Indoor Radon Abatement Act (IRAA) of 1988. The Radon Contractor Proficiency Program consists of several elements that collectively help to ensure the proficiency of radon mitigators and give the public greater confidence in their capability. Contractors who participate in the program must pass a written examination, adhere to mitigation guidelines, keep records of work, meet continuing education requirements and pass a re-examination every two years. Upon meeting the program's requirements, mitigators are listed in EPA's National RCP Proficiency Report. The first Report released on May 15, 1990 listed 636 contractors. The second Report, to be release in August, will list 895 contractors, representing an increase of 40 per cent

  13. Operator and contractor benefit from incentive contracts

    International Nuclear Information System (INIS)

    Brandon, B.

    1991-01-01

    This book reports that with incentive contracts, drilling and service contractors assume greater responsibility for operations. That helps them to align their goals more closely with those of the operator. This achieves a more equitable division of the risks. Many operators and contractors believe this is a more appropriate approach to contracting drilling services. As they assume manageable responsibility, each party also has opportunities for greater reward. Innovations in cooperation can create a win-win situation. In a win-win contract all parties benefit from the new relationships between operator, contractor, and service company. The win-win situation can only be achieved by allowing the contracting parties to become much more closely involved in drilling operations. This is the primary motivation behind development of more productive contracting strategies

  14. CEC workshop on methods for assessing the offsite radiological consequences of nuclear accidents

    International Nuclear Information System (INIS)

    Luykx, F.; Sinnaeve, J.

    1986-01-01

    On Apr 15-19, 1985, in Luxembourg, the Commission of the European Communities (CEC), in collaboration with the Kernforschungszentrum Karlsruhe (KfK), Federal Republic of Germany, and the National Radiological Protection Board (NRPB), United Kingdom, presented a workshop on methods for assessing the offsite radiological consequences of nuclear accidents. The program consisted of eight sessions. The main conclusions, which were presented in the Round Table Session by the individual Session Chairmen, are summarized. Session topics are as follows: Session I: international developments in the field of accident consequence assessment (ACA); Session II: atmospheric dispersion; Session III: food chain models; Session IV: urban contamination; Session V: demographic and land use data; Session VI: dosimetry, health effects, economic and counter measure models; Session VII: uncertainty analysis; and Session VIII: application of probabilistic consequence models as decision aids

  15. Synthesis and characterization of 18F-labeled active site inhibited factor VII (ASIS)

    DEFF Research Database (Denmark)

    Erlandsson, Maria; Nielsen, Carsten Haagen; Jeppesen, Troels Elmer

    2015-01-01

    Activated factor VII blocked in the active site with Phe-Phe-Arg-chloromethyl ketone (active site inhibited factor VII (ASIS)) is a 50-kDa protein that binds with high affinity to its receptor, tissue factor (TF). TF is a transmembrane glycoprotein that plays an important role in, for example......, thrombosis, metastasis, tumor growth, and tumor angiogenesis. The aim of this study was to develop an 18F-labeled ASIS derivative to assess TF expression in tumors. Active site inhibited factor VII was labeled using N-succinimidyl-4-[18F]fluorobenzoate, and the [18F]ASIS was purified on a PD-10 desalting...... column. The radiochemical yield was 25 ± 6%, the radiochemical purity was >97%, and the pseudospecific radioactivity was 35 ± 9 GBq/µmol. The binding efficacy was evaluated in pull-down experiments, which monitored the binding of unlabeled ASIS and [18F]ASIS to TF and to a specific anti-factor VII...

  16. Topical application of recombinant activated factor VII during cesarean delivery for placenta previa.

    Science.gov (United States)

    Schjoldager, Birgit T B G; Mikkelsen, Emmeli; Lykke, Malene R; Præst, Jørgen; Hvas, Anne-Mette; Heslet, Lars; Secher, Niels J; Salvig, Jannie D; Uldbjerg, Niels

    2017-06-01

    During cesarean delivery in patients with placenta previa, hemorrhaging after removal of the placenta is often challenging. In this condition, the extraordinarily high concentration of tissue factor at the placenta site may constitute a principle of treatment as it activates coagulation very effectively. The presumption, however, is that tissue factor is bound to activated factor VII. We hypothesized that topical application of recombinant activated factor VII at the placenta site reduces bleeding without affecting intravascular coagulation. We included 5 cases with planned cesarean delivery for placenta previa. After removal of the placenta, the surgeon applied a swab soaked in recombinant activated factor VII containing saline (1 mg in 246 mL) to the placenta site for 2 minutes; this treatment was repeated once if the bleeding did not decrease sufficiently. We documented the treatment on video recordings and measured blood loss. Furthermore, we determined hemoglobin concentration, platelet count, international normalized ratio, activated partial thrombin time, fibrinogen (functional), factor VII:clot, and thrombin generation in peripheral blood prior to and 15 minutes after removal of the placenta. We also tested these blood coagulation variables in 5 women with cesarean delivery planned for other reasons. Mann-Whitney test was used for unpaired data. In all 5 cases, the uterotomy was closed under practically dry conditions and the median blood loss was 490 (range 300-800) mL. There were no adverse effects of recombinant activated factor VII and we did not measure factor VII to enter the circulation. Neither did we observe changes in thrombin generation, fibrinogen, activated partial thrombin time, international normalized ratio, and platelet count in the peripheral circulation (all P values >.20). This study indicates that in patients with placenta previa, topical recombinant activated factor VII may diminish bleeding from the placenta site without initiation

  17. Grantee Spotlight: Manuel L. Penichet, M.D., Ph.D. - Reprogramming the Immune System to Kill Cancer

    Science.gov (United States)

    Dr. Manuel L. Penichet, former CURE K01 trainee and NCI R01 grantee, aims to genetically engineer antibodies that can be used to directly target and eliminate cancer cells and also stimulate the body’s immune system to fight and destroy cancer.

  18. TEH võrgustik - viis aastat Eestis / Marika Kusnets

    Index Scriptorium Estoniae

    Kusnets, Marika

    2005-01-01

    Eestis on tervist edendavate haiglate (TEH) võrgustik tegutsenud juba viis aastat, sellega on liitunud 22 haiglat. Tänavust konverentsi peeti teemal "Tervise edendamine ja kvaliteedi tagamine haiglas: standardid ja praktika"

  19. 77 FR 69715 - Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration

    Science.gov (United States)

    2012-11-20

    ... Contractor Registration AGENCY: Department of Defense (DoD), General Services Administration (GSA), and... changes the clauses requiring contractor registration in the Central Contractor Registration (CCR... unique identifier for contractors. It is used (1) to uniquely identify a contractor entity, and (2) to...

  20. Exposing government response action contractors to environmental tort liability

    International Nuclear Information System (INIS)

    Roy, M.J.

    1991-01-01

    Government contractors, particularly those involved with hazardous waste response action activities, are encountering increased risks for environmental tort liabilities. Contracts often include tasks and work assignments requiring the management of industrial, chemical, nuclear or mining wastes, spent fuels, munitions or other toxic substances. Contractors exposure to liability for damages results directly from the environmental laws and regulations pursuant to which the Government has contracted them to respond. Additionally, contractors may be exposed to common law liability under such dogmas as nuisance, trespass and strict liability in tort

  1. 75 FR 66680 - Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor...

    Science.gov (United States)

    2010-10-29

    ...-AG52 Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor... that contractors providing essential contractor services, as determined by the requiring activity..., implementing the requirements of DoDI 3020.37, Continuation of Essential DoD Contractor Services During Crises...

  2. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Science.gov (United States)

    2010-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984) (a...

  3. Oxidation of triclosan by permanganate (Mn(VII)): importance of ligands and in situ formed manganese oxides.

    Science.gov (United States)

    Jiang, Jin; Pang, Su-Yan; Ma, Jun

    2009-11-01

    Experiments were conducted to examine permanganate (Mn(VII); KMnO(4)) oxidation of the widely used biocide triclosan (one phenolic derivative) in aqueous solution at pH values of 5-9. Under slightly acidic conditions, the reactions displayed autocatalysis, suggesting the catalytic role of in situ formed MnO(2). This was further supported by the promoting effects of the addition of preformed MnO(2) colloids on Mn(VII) oxidations of triclosan and two other selected phenolics (i.e., phenol and 2,4-dichlorophenol), as well as p-nitrophenol which otherwise showed negligible reactivity toward Mn(VII) and MnO(2) colloids, respectively. Surprisingly, phosphate buffer significantly enhanced Mn(VII) oxidation of triclosan, as well as phenol and 2,4-dichlorophenol over a wide pH range. Further, several other selected ligands (i.e., pyrophosphate, EDTA, and humic acid) also exerted oxidation enhancement, supporting a scenario where highly active aqueous manganese intermediates (Mn(INT)(aq)) formed in situ upon Mn(VII) reduction might be stabilized to a certain extent in the presence of ligands and subsequently involved in further oxidation of target phenolics, whereas without stabilizing agents Mn(INT)(aq) autodecomposes or disproportionates spontaneously. The effectiveness of Mn(VII) for the oxidative removal of triclosan in natural water and wastewater was confirmed. Their background matrices were also found to accelerate Mn(VII) oxidation of phenolics.

  4. 42 CFR 495.348 - Procurement standards.

    Science.gov (United States)

    2010-10-01

    ... unfair competitive advantage, contractors that develop or draft grant applications, or contract... small businesses, minority-owned firms, and women's business enterprises, whenever possible. Grantees of Departmental awards must take all of the following steps to further this goal: (i) Ensure that small businesses...

  5. 78 FR 21116 - Proposed Collection; Comment Request

    Science.gov (United States)

    2013-04-09

    ...-0472. Needs and Uses: Executive Order 12829, ``National Industrial Security Program (NISP)'' Section... monitoring the contractors, licensees, and grantees who require or will require access to or who store or will store classified information; and for determining the eligibility for access to classified...

  6. 78 FR 30233 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Science.gov (United States)

    2013-05-22

    ... Number 0750-AG38 Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access... Government support contractors to have access to proprietary technical data belonging to prime contractors and other third parties, provided that the technical data owner may require the support contractor to...

  7. Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method

    Science.gov (United States)

    Alptekin, Orkun; Alptekin, Nesrin

    2017-10-01

    Selection of the most suitable contractor is an important process in public construction projects. This process is a major decision which may influence the progress and success of a construction project. Improper selection of contractors may lead to problems such as bad quality of work and delay in project duration. Especially in the construction projects of public buildings, the proper choice of contractor is beneficial to the public institution. Public procurement processes have different characteristics in respect to dissimilarities in political, social and economic features of every country. In Turkey, Turkish Public Procurement Law PPL 4734 is the main regulatory law for the procurement of the public buildings. According to the PPL 4734, public construction administrators have to contract with the lowest bidder who has the minimum requirements according to the criteria in prequalification process. Public administrators are not sufficient for selection of the proper contractor because of the restrictive provisions of the PPL 4734. The lowest bid method does not enable public construction administrators to select the most qualified contractor and they have realised the fact that the selection of a contractor based on lowest bid alone is inadequate and may lead to the failure of the project in terms of time delay Eand poor quality standards. In order to evaluate the overall efficiency of a project, it is necessary to identify selection criteria. This study aims to focus on identify importance of other criteria besides lowest bid criterion in contractor selection process of PPL 4734. In this study, a survey was conducted to staff of Department of Construction Works of Eskisehir Osmangazi University. According to TOPSIS (Technique for Order Preference by Similarity to the Ideal Solution) for analysis results, termination of construction work in previous tenders is the most important criterion of 12 determined criteria. The lowest bid criterion is ranked in rank 5.

  8. 78 FR 41070 - Notice of Single-Case Deviation from Competition Requirements: Transfer of Grantee Request for...

    Science.gov (United States)

    2013-07-09

    ... Single-Case Deviation from Competition Requirements: Transfer of Grantee Request for the Detroit Healthy... Health and Human Services (HHS). ACTION: Notice of Single-Case Deviation from Competition Requirements... pregnancy and interconceptional phases for women and infants residing in the proposed project area. In order...

  9. Project Finance Model for Small Contractors in USA

    Directory of Open Access Journals (Sweden)

    Jawahar Nesan

    2012-11-01

    Full Text Available Construction projects do not require a large capital outlay but a large working capital to start up the project. Unfortunately, for small contractors there are very limited options available from the banks or other lending institutions to cover this large working capital requirement in the absence of sufficient collateral. The “Project Finance” method presented in this paper is recommended as the most effective method for small contractors in the United States. The problems of small and start up contractors in funding their projects have been little addressed in the literature. The current financing practices were observed through both the literature review and interviews with contractors and bankers in the western Michigan area and subsequently a system has been proposed which could help a small start-up company seeking higher growth. The growth rates that can be achieved using the project finance system in contrast to the traditional “line of credit” arrangements as illustrated in this paper show that the project finance model is beneficial.

  10. 77 FR 31371 - Public Workshop: Privacy Compliance Workshop

    Science.gov (United States)

    2012-05-25

    ... presentations, including the privacy compliance fundamentals, privacy and data security, and the privacy... DEPARTMENT OF HOMELAND SECURITY Office of the Secretary Public Workshop: Privacy Compliance... Homeland Security Privacy Office will host a public workshop, ``Privacy Compliance Workshop.'' DATES: The...

  11. Coagulation factor VII, serum-triglycerides and the R/Q353 polymorphism: Differences between older men and women

    NARCIS (Netherlands)

    Mennen, L.I.; Maat, M.P.M. de; Schouten, E.G.; Kluft, C.; Jong, P.T.V.M. de; Hofman, A.; Grobbee, D.E.

    1997-01-01

    Coagulation factor VII activity (FVII:C) is a risk indicator for cardiovascular disease. It is related to serum-triglycerides and the R/Q353 polymorphism (alleles R and Q) in the gene coding for factor VII is strongly associated with factor VU[. The association of serum-triglycerides with factor VII

  12. FCCSET/CEHR summer institutes for teacher development in science, mathematics, and technology. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report summarizes the profiling procedure that grantees used to carry out a formative evaluation of their summer institutes. It discusses programmatic issues identified through profiling as well as how well the profiling process worked for the grantees. The report contains recommendations on both programmatic issues and profiling for NSTC/DOE, NCISE (the technical assistance provider), and the grantees themselves. In early September NCISE held its second workshop for NSTC grantees. Data from the evaluation of this two-day event generated six recommendations for DOE and the technical assistance provider. This NCISE report summarizes the two-year process NCISE used in attempting to help the grantees establish some indicators of success. A number of indicators were identified the first year with others added the second year. Additionally, a compilation of the various measures for the indicators of success developed collaboratively by NCISE and grantees is included. Although these indicators are not mandatory, they do provide guides for grantees in assessing the impact of the institutes. Embedded in the report are several recommendations for NSTC/DOE and the technical assistance provider.

  13. Building America Expert Meeting Report. Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, Arlan [IBACOS Inc., Pittsburgh, PA (United States)

    2011-10-01

    This expert meeting was hosted by the IBACOS Building America research team to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting.

  14. 76 FR 50714 - Federal Acquisition Regulation; Documenting Contractor Performance; Correction

    Science.gov (United States)

    2011-08-16

    ... Regulation; Documenting Contractor Performance; Correction AGENCY: Department of Defense (DoD), General... August 9, 2011, regarding the proposed rule for Documenting Contractor Performance. DATES: The comment...

  15. Synthesis, purification, and characterization of an Arg sub 152 yields Glu site-directed mutant of recombinant human blood clotting factor VII

    Energy Technology Data Exchange (ETDEWEB)

    Wildgoose, P.; Kisiel, W. (Univ. of New Mexico, Albuquerque (USA)); Berkner, K.L. (ZymoGenetics, Inc., Seattle, WA (USA))

    1990-04-03

    Coagulation factor VII circulates in blood as a single-chain zymogen of a serine protease and is converted to its activated two-chain form, factor VIIa, by cleavage of an internal peptide bond located at Arg{sub 152}-Ile{sub 153}. Previous studies using serine protease active-site inhibitors suggest that zymogen factor VII may possess sufficient proteolytic activity to initiate the extrinsic pathway of blood coagulation. In order to assess the putative intrinsic proteolytic activity of single-chain factor VII, the authors have constructed a site-specific mutant of recombinant human factor VII in which arginine-152 has been replaced with a glutamic acid residue. Mutant factor VII was purified in a single step from culture supernatants of baby hamster kidney cells transfected with a plasmid containing the sequence for Arg{sub 152} {yields} Glu factor VII using a calcium-dependent, murine anti-factor VII monoclonal antibody column. The clotting activity of mutant factor VII was completely inhibited following incubation with dansyl-Glu-Gly-Arg chloromethyl ketone, suggesting that the apparent clotting activity of mutant factor VII was due to a contaminating serine protease. Immunoblots of mutant factor VII with human factor IXa revealed no cleavage, whereas incubation of mutant factor VII with human factor Xa resulted in cleavage of mutant factor VII and the formation of a lower molecular weight degradation product migrating at M{sup r}{approx}40 000. The results are consistent with the proposal that zymogen factor VII possesses no intrinsic proteolytic activity toward factor X or factor IX.

  16. Highlights of contractor initiatives in quality enhancement and productivity improvement

    Science.gov (United States)

    1986-01-01

    The NASA/Contractor Team efforts are presented as part of NASA's continuing effort to facilitate the sharing of quality and productivity improvement ideas among its contractors. This complilation is not meant to be a comprehensive review of contractor initiative nor does it necessarily express NASA's views. The submissions represent samples from a general survey, and were not edited by NASA. The efforts are examples of quality and productivity programs in private industry, and as such, highlight company efforts in individual areas. Topics range from modernization of equipment, hardware, and technology to management of human resources. Of particular interest are contractor initiatives which deal with measurement and evaluation data pertaining to quality and productivity performance.

  17. Evidence supporting the use of recombinant activated factor VII in congenital bleeding disorders

    DEFF Research Database (Denmark)

    Johansson, Pär I; Ostrowski, Sisse R

    2010-01-01

    Recombinant activated factor VII (rFVIIa, NovoSeven) was introduced in 1996 for the treatment of hemophilic patients with antibodies against coagulation factor VIII or IX.......Recombinant activated factor VII (rFVIIa, NovoSeven) was introduced in 1996 for the treatment of hemophilic patients with antibodies against coagulation factor VIII or IX....

  18. Medicare Administrative Contractor Performance Evaluation

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Centers for Medicare and Medicaid Services (CMS) has compiled a summary of overall Medicare Administrative Contractor (MAC) performance information as measured...

  19. 48 CFR 852.236-72 - Performance of work by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance of work by the....236-72 Performance of work by the contractor. As prescribed in 836.501, insert the following clause: Performance of Work by the Contractor (JUL 2002) The clause entitled “Performance of Work by the Contractor...

  20. Strategic management competencies in Scandinavian contractors

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2013-01-01

    Over the past ten years, a series of contractors operating in Denmark, Norway and Sweden have slowly but surely expanded their markets beyond their previous single-country base towards operating in Scandinavia as a whole, and beyond. This expansion has been accompanied by a restructuring of company...... management and HR concepts and approaches. Methodologically, a sample of the top level leaders of the hundred largest business units at some thirty Scandinavian contractors has been analysed. The focus is on the 400 top level managers in these organisations. On the basis of a desk study, an analysis of 124...

  1. 2005 NASA Seal/Secondary Air System Workshop, Volume 1

    Science.gov (United States)

    Steinetz, Bruce M. (Editor); Hendricks, Robert C. (Editor)

    2006-01-01

    The 2005 NASA Seal/Secondary Air System workshop covered the following topics: (i) Overview of NASA s new Exploration Initiative program aimed at exploring the Moon, Mars, and beyond; (ii) Overview of the NASA-sponsored Propulsion 21 Project; (iii) Overview of NASA Glenn s seal project aimed at developing advanced seals for NASA s turbomachinery, space, and reentry vehicle needs; (iv) Reviews of NASA prime contractor, vendor, and university advanced sealing concepts including tip clearance control, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. Turbine engine studies have shown that reducing high-pressure turbine (HPT) blade tip clearances will reduce fuel burn, lower emissions, retain exhaust gas temperature margin, and increase range. Several organizations presented development efforts aimed at developing faster clearance control systems and associated technology to meet future engine needs. The workshop also covered several programs NASA is funding to develop technologies for the Exploration Initiative and advanced reusable space vehicle technologies. NASA plans on developing an advanced docking and berthing system that would permit any vehicle to dock to any on-orbit station or vehicle. Seal technical challenges (including space environments, temperature variation, and seal-on-seal operation) as well as plans to develop the necessary "androgynous" seal technologies were reviewed. Researchers also reviewed tests completed for the shuttle main landing gear door seals.

  2. Emerging Trends of the Owner-Contractor Relationship for Capital Facility Projects: From the Contractor Perspective

    National Research Council Canada - National Science Library

    Geertsema, Cameron

    2003-01-01

    .... Specifically, this document will focus on how the outcome of capital facility projects are affected by human resources practices, and the management principles and practices of the contractor-owner...

  3. Workshops som forskningsmetode

    OpenAIRE

    Ørngreen, Rikke; Levinsen, Karin Tweddell

    2017-01-01

    This paper contributes to knowledge on workshops as a research methodology, and specifically on how such workshops pertain to e-learning. A literature review illustrated that workshops are discussed according to three different perspectives: workshops as a means, workshops as practice, and workshops as a research methodology. Focusing primarily on the latter, this paper presents five studies on upper secondary and higher education teachers’ professional development and on teaching and learnin...

  4. The Effect of Neonatal Gene Therapy on Skeletal Manifestations in Mucopolysaccharidosis VII Dogs after a Decade

    Science.gov (United States)

    Xing, Elizabeth M.; Knox, Van W.; O'Donnell, Patricia A.; Sikura, Tracey; Liu, Yuli; Wu, Susan; Casal, Margret L.; Haskins, Mark E.; Ponder, Katherine P.

    2013-01-01

    Mucopolysaccharidosis (MPS) VII is a lysosomal storage disease due to deficient activity of β-glucuronidase (GUSB), and results in glycosaminoglycan accumulation. Skeletal manifestations include bone dysplasia, degenerative joint disease, and growth retardation. One gene therapy approach for MPS VII involves neonatal intravenous injection of a gamma retroviral vector expressing GUSB, which results in stable expression in liver and secretion of enzyme into blood at levels predicted to be similar or higher to enzyme replacement therapy. The goal of this study was to evaluate the long-term effect of neonatal gene therapy on skeletal manifestations in MPS VII dogs. Treated MPS VII dogs could walk throughout their lives, while untreated MPS VII dogs could not stand beyond 6 months and were dead by 2 years. Luxation of the coxofemoral joint and the patella, dysplasia of the acetabulum and supracondylar ridge, deep erosions of the distal femur, and synovial hyperplasia were reduced, and the quality of articular bone was improved in treated dogs at 6 to 11 years of age compared with untreated MPS VII dogs at 2 years or less. However, treated dogs continued to have osteophyte formation, cartilage abnormalities, and an abnormal gait. Enzyme activity was found near synovial blood vessels, and there was 2% as much GUSB activity in synovial fluid as in serum. We conclude that neonatal gene therapy reduces skeletal abnormalities in MPS VII dogs, but clinically-relevant abnormalities remain. Enzyme replacement therapy will probably have similar limitations long-term. PMID:23628461

  5. DOE contractor's meeting on chemical toxicity

    International Nuclear Information System (INIS)

    1987-01-01

    The Office of Health and Environmental Research (OHER) is required to determine the potential health and environmental effects associated with energy production and use. To ensure appropriate communication among investigators and scientific disciplines that these research studies represent, OHER has sponsored workshops. This document provides a compilation of activities at the Third Annual DOE/OHER Workshop. This year's workshop was broadened to include all OHER activities identified as within the chemical effects area. The workshop consisted of eight sessions entitled Isolation and Detection of Toxic chemicals; Adduct Formation and Repair; Chemical Toxicity (Posters); Metabolism and Genotoxicity; Inhalation Toxicology; Gene Regulation; Metals Toxicity; and Biological Mechanisms. This document contains abstracts of the information presented by session

  6. 77 FR 51783 - Federal Acquisition Regulation; Information Collection; Contractors' Purchasing Systems Reviews

    Science.gov (United States)

    2012-08-27

    ...; Information Collection; Contractors' Purchasing Systems Reviews AGENCY: Department of Defense (DOD), General... collection requirement concerning contractors' purchasing systems reviews. Public comments are particularly... Information Collection 9000- 0132, Contractors' Purchasing Systems Reviews, by any of the following methods...

  7. 76 FR 60837 - Federal Acquisition Regulation; Information Collection; Contractor Business Ethics Compliance...

    Science.gov (United States)

    2011-09-30

    ...; Information Collection; Contractor Business Ethics Compliance Program and Disclosure Requirements AGENCIES... concerning contractor business ethics compliance program and disclosure requirements. Public comments are... Collection 9000- 0164, Contractor Business Ethics Compliance Program and Disclosure Requirements, by any of...

  8. Contractor firm strategies in delivering green project: A review

    Science.gov (United States)

    Powmya, Ayisha; Abidin, Nazirah Zainul; Azizi, Nurul Sakina Mokhtar

    2017-10-01

    Building green requires effort from various parties, from those who plan, design, manage and construct the building. Contractors are responsible for converting the design on paper into a real building and their role at the construction site support environmental sustainability by implementing responsible construction practices. Inefficient or inexperienced contractor in green construction project may find that delivering this type of project is not an easy task due to added requirement in design, stringent practices at site and the use of green technology and materials. Adopting suitable strategies at firm level will assist in preparatory process and readiness of delivering the green project. This paper reviews the strategies at firm level to deliver green construction project. From extensive literature review, it was discovered that there are six strategies to be adopted by the contractor. Understanding these strategies is expected to promote more contractors to be proactive in delivering green projects.

  9. 20 CFR 632.32 - Financial management systems.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Financial management systems. 632.32 Section... Financial management systems. (a) Each Native American grantee, subgrantee and contractor shall maintain a financial management system which will provide accurate, current and complete disclosure of the financial...

  10. Treatment of lysosomal storage disease in MPS VII mice using a recombinant adeno-associated virus.

    Science.gov (United States)

    Watson, G L; Sayles, J N; Chen, C; Elliger, S S; Elliger, C A; Raju, N R; Kurtzman, G J; Podsakoff, G M

    1998-12-01

    Mucopolysaccharidosis type VII (MPS VII) is a lysosomal storage disease caused by a genetic deficiency of beta-glucuronidase (GUS). We used a recombinant adeno-associated virus vector (AAV-GUS) to deliver GUS cDNA to MPS VII mice. The route of vector administration had a dramatic effect on the extent and distribution of GUS activity. Intramuscular injection of AAV-GUS resulted in high, localized production of GUS, while intravenous administration produced low GUS activity in several tissues. This latter treatment of MPS VII mice reduced glycosaminoglycan levels in the liver to normal and reduced storage granules dramatically. We show that a single administration of AAV-GUS can provide sustained expression of GUS in a variety of cell types and is sufficient to reverse the disease phenotype at least in the liver.

  11. PERANCANGAN SISTEM INFORMASI DI PTAIS KOPERTAIS WILAYAH VII SUMATERA SELATAN

    Directory of Open Access Journals (Sweden)

    Fenny Purwani

    2015-12-01

    Full Text Available Relations and information technology today closely related. One technology that is widely used and very popular on the Internet is a website. The website is agood means to facilitate and share information as much to college. However, the college today togetthe informationisnot maximized. This study aimstobuildawebsite on Kopertais SUMBAGSEL region VII. This website was developed using Macromedia Dreamweaver CS3 software, PHP, and MySQL, and method development using RAD (Rapid Application Development, and the purpose of this website serves to facilitate the college to receiver elevant information about online Kopertais VII region and terupdates.

  12. 78 FR 59851 - Defense Federal Acquisition Regulation Supplement: Enhancement of Contractor Employee...

    Science.gov (United States)

    2013-09-30

    ...-AH97 Defense Federal Acquisition Regulation Supplement: Enhancement of Contractor Employee... contractor and subcontractor employees. DATES: Effective date: September 30, 2013. In accordance with FAR 1... Whistleblower Protections for Contractor Employees) made extensive changes to 10 U.S.C. 2409, entitled...

  13. Addition to the analysis of the Sr VI and Sr VII spectra

    International Nuclear Information System (INIS)

    Wyart, J.F.

    1989-01-01

    Fifty-six lines of multicharged strontium are measured with an improved wavelength accuracy, or interpreted for the first time. They are 4p-4s, 4p-5s and 4p-4d transitions in Sr VII and 4p-5s transitions in Sr VI. The revision of the singlet-triplet connection in Sr VII is supported by theoretical survey of the ground configuration in Ge-like ions. (orig.)

  14. Contractors on the Battlefield: What Have We Signed Up For?

    National Research Council Canada - National Science Library

    Zamparelli, Steven

    1999-01-01

    The role of contractors in warfare has changed dramatically. As the Services have drawn down, more and more of the duties formerly accomplished by military members are being performed by contractors...

  15. HTTR workshop (workshop on hydrogen production technology)

    International Nuclear Information System (INIS)

    Shiina, Yasuaki; Takizuka, Takakazu

    2004-12-01

    Various research and development efforts have been performed to solve the global energy and environmental problems caused by large consumption of fossil fuels. Research activities on advanced hydrogen production technology by the use of nuclear heat from high temperature gas cooled reactors, for example, have been flourished in universities, research institutes and companies in many countries. The Department of HTTR Project and the Department of Advanced Nuclear Heat Technology of JAERI held the HTTR Workshop (Workshop on Hydrogen Production Technology) on July 5 and 6, 2004 to grasp the present status of R and D about the technology of HTGR and the nuclear hydrogen production in the world and to discuss about necessity of the nuclear hydrogen production and technical problems for the future development of the technology. More than 110 participants attended the Workshop including foreign participants from USA, France, Korea, Germany, Canada and United Kingdom. In the Workshop, the presentations were made on such topics as R and D programs for nuclear energy and hydrogen production technologies by thermo-chemical or other processes. Also, the possibility of the nuclear hydrogen production in the future society was discussed. The workshop showed that the R and D for the hydrogen production by the thermo-chemical process has been performed in many countries. The workshop affirmed that nuclear hydrogen production could be one of the competitive supplier of hydrogen in the future. The second HTTR Workshop will be held in the autumn next year. (author)

  16. 75 FR 55577 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2010-09-13

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9200-8] Clean Water Act; Contractor Access to Confidential... Recovery Act (RCRA). Transfer of the information will allow the contractor and subcontractors to access... contractors and subcontractors over the history of the effluent guidelines program. EPA determined that this...

  17. 75 FR 82575 - Federal Acquisition Regulation; Personal Identity Verification of Contractor Personnel

    Science.gov (United States)

    2010-12-30

    ... 9000-AL60 Federal Acquisition Regulation; Personal Identity Verification of Contractor Personnel AGENCY... requirement of collecting from contractors all forms of Government-provided identification once they are no...D Inspector General Audit Report No. D-2009-005, entitled ``Controls Over the Contractor Common...

  18. 77 FR 60962 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2012-10-05

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 2 [FRL-9733-8] Clean Water Act; Contractor Access to... transfer of confidential business information to contractor, subcontractors, and consultants. SUMMARY: The... certain industries. We have determined that the contractors listed below require access [[Page 60963

  19. 77 FR 51496 - Federal Acquisition Regulation; Basic Safeguarding of Contractor Information Systems

    Science.gov (United States)

    2012-08-24

    ... Federal Acquisition Regulation; Basic Safeguarding of Contractor Information Systems AGENCY: Department of... Acquisition Regulation (FAR) to add a new subpart and contract clause for the basic safeguarding of contractor... information) that will be resident on or transiting through contractor information systems. DATES: Interested...

  20. 75 FR 60452 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2010-09-30

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9208-9] Clean Water Act; Contractor Access to Confidential... electric industry to a new subcontractor of a contractor, Eastern Research Group (ERG). EPA previously... contractors and subcontractors to access information necessary to support EPA in the planning, development...

  1. 76 FR 4343 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Science.gov (United States)

    2011-01-25

    ...; Contractor Conflicts of Interest AGENCY: Environmental Protection Agency. ACTION: Notice. SUMMARY: In... control numbers in certain EPA regulations is consolidated in 40 CFR part 9. Abstract: EPA contractors... cleanup and enforcement and because its contractors are often involved in both activities, it is...

  2. 76 FR 81490 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Science.gov (United States)

    2011-12-28

    ... Activities; Proposed Collection; Comment Request; Contractor Cumulative Claim and Reconciliation (Renewal... identify the Docket ID Number EPA-HQ-OARM-2011-0997, Contractor Cumulative Claim and Reconciliation. Hand... information collection activity or ICR does this apply to? Affected entities: All contractors who have...

  3. The main factor affecting the competitiveness of Contractor Company

    Science.gov (United States)

    Nurisra; Malahayati, Nurul; Mahmuddin

    2018-05-01

    Contractor companies must have the competitive advantage to compete in maintaining the survival of the company. Problems arise because quite a lot of advantages can be used and these advantages must be used appropriately to produce competitiveness for the company to continue to compete and to win the competition. This study aims to determine the main factors affecting the competitiveness of medium-class contractors in Banda Aceh. Data collection was obtained through questionnaires distributed to 31 middle-class contractors in Banda Aceh. Data processing and analysis is done by using descriptive analysis. Based on the result of descriptive analysis, it can be concluded that the most important competitiveness factor with a mean score value 4.52 is the relationship, and the factor that has the highest mean score value is the relationship with the government of 4.97, while the result of the ranking analysis is obtained 25 factor that is critical to the competitiveness of medium-class contractors in Banda Aceh.

  4. ACED Federal Grant Contractor Tracking

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Dataset includes grant, project, and contractor awarded which are tracked for ensuring Davis-Bacon Act compliance where applicable. The 1931 Davis-Bacon Act...

  5. Construction Manager or General Contractor?

    Science.gov (United States)

    McKinley, John

    1991-01-01

    Unlike the general contractor approach, the construction management firm acts on behalf of the school district in school construction. Examines the development and nature of construction management, and cites its advantages and disadvantages. (MLF)

  6. Drawing the critical distinction between independent contractors and permanent employees : the tax implications

    Energy Technology Data Exchange (ETDEWEB)

    Bodie, J.S.; Haymour, J. [Fraser Milner, Calgary, AB (Canada)

    1999-10-01

    The many factors that should be considered when distinguishing between an independent contractor and an employee from the perspective of tax laws were discussed. Some of the major areas where disputes regarding relationships between the employee and the independent contractor arise were reviewed with particular emphasis on some of the dangers associated with a change in characterization of these types of relationships. Ways in which to guard against these dangers were also presented. The courts have established the following four tests to determine a contractor`s status: (1) the control test, (2) the economic reality test, (3) the business integration test, and (4) the ownership of tools test. The control tests looks to the degree of control that an employer/recipient of services possesses over the work that is to be performed. The economic reality test looks to whether the contractor is actually in business for himself and is risking a loss. The business integration test examines the relationship between employer and contractor in terms of how economically dependent the contractor is on the employer and whether the task the contractor carries on forms an integral part of the business of the employer. The last test examines who owns the tools used by the contractor to carry out his duties. This presentation also reviewed how employers and contractors are responsible for adhering to Revenue Canada tax laws and certain liabilities regarding income taxes, Employment Insurance (EI) premiums, Canada Pension Plan (CPP) contributions and other amounts.

  7. Pseudane-VII Isolated from Pseudoalteromonas sp. M2 Ameliorates LPS-Induced Inflammatory Response In Vitro and In Vivo

    Directory of Open Access Journals (Sweden)

    Mi Eun Kim

    2017-11-01

    Full Text Available The ocean is a rich resource of flora, fauna, food, and biological products. We found a wild-type bacterial strain, Pseudoalteromonas sp. M2, from marine water and isolated various secondary metabolites. Pseudane-VII is a compound isolated from the Pseudoalteromonas sp. M2 metabolite that possesses anti-melanogenic activity. Inflammation is a response of the innate immune system to microbial infections. Macrophages have a critical role in fighting microbial infections and inflammation. Recent studies reported that various compounds derived from natural products can regulate immune responses including inflammation. However, the anti-inflammatory effects and mechanism of pseudane-VII in macrophages are still unknown. In this study, we investigated the anti-inflammatory effects of pseudane-VII. In present study, lipopolysaccharide (LPS-induced nitric oxide (NO production was significantly decreased by pseudane-VII treatment at 6 μM. Moreover, pseudane-VII treatment dose-dependently reduced mRNA levels of pro-inflammatory cytokines including inos, cox-2, il-1β, tnf-α, and il-6 in LPS-stimulated macrophages. Pseudane-VII also diminished iNOS protein levels and IL-1β secretion. In addition, Pseudane-VII elicited anti-inflammatory effects by inhibiting ERK, JNK, p38, and nuclear factor (NF-κB-p65 phosphorylation. Consistently, pseudane-VII was also shown to inhibit the LPS-stimulated release of IL-1β and expression of iNOS in mice. These results suggest that pseudane-VII exerted anti-inflammatory effects on LPS-stimulated macrophage activation via inhibition of ERK, JNK, p38 MAPK phosphorylation, and pro-inflammatory gene expression. These findings may provide new approaches in the effort to develop anti-inflammatory therapeutics.

  8. Pseudane-VII Isolated from Pseudoalteromonas sp. M2 Ameliorates LPS-Induced Inflammatory Response In Vitro and In Vivo.

    Science.gov (United States)

    Kim, Mi Eun; Jung, Inae; Lee, Jong Suk; Na, Ju Yong; Kim, Woo Jung; Kim, Young-Ok; Park, Yong-Duk; Lee, Jun Sik

    2017-11-01

    The ocean is a rich resource of flora, fauna, food, and biological products. We found a wild-type bacterial strain, Pseudoalteromonas sp. M2, from marine water and isolated various secondary metabolites. Pseudane-VII is a compound isolated from the Pseudoalteromonas sp. M2 metabolite that possesses anti-melanogenic activity. Inflammation is a response of the innate immune system to microbial infections. Macrophages have a critical role in fighting microbial infections and inflammation. Recent studies reported that various compounds derived from natural products can regulate immune responses including inflammation. However, the anti-inflammatory effects and mechanism of pseudane-VII in macrophages are still unknown. In this study, we investigated the anti-inflammatory effects of pseudane-VII. In present study, lipopolysaccharide (LPS)-induced nitric oxide (NO) production was significantly decreased by pseudane-VII treatment at 6 μM. Moreover, pseudane-VII treatment dose-dependently reduced mRNA levels of pro-inflammatory cytokines including inos , cox-2 , il-1β , tnf-α , and il-6 in LPS-stimulated macrophages. Pseudane-VII also diminished iNOS protein levels and IL-1β secretion. In addition, Pseudane-VII elicited anti-inflammatory effects by inhibiting ERK, JNK, p38, and nuclear factor (NF)-κB-p65 phosphorylation. Consistently, pseudane-VII was also shown to inhibit the LPS-stimulated release of IL-1β and expression of iNOS in mice. These results suggest that pseudane-VII exerted anti-inflammatory effects on LPS-stimulated macrophage activation via inhibition of ERK, JNK, p38 MAPK phosphorylation, and pro-inflammatory gene expression. These findings may provide new approaches in the effort to develop anti-inflammatory therapeutics.

  9. Effects of different progestin regimens in hormone replacement therapy on blood coagulation factor VII and tissue factor pathway inhibitor

    DEFF Research Database (Denmark)

    Bladbjerg, E-M; Skouby, S O.; Andersen, L F

    2002-01-01

    BACKGROUND: Long-term hormone replacement therapy (HRT) reduces cardiovascular risk, but an early increased risk was reported in women with coronary heart disease. In such women the arterial intima can express tissue factor, and changes in coagulation factor VII (factor VII) and tissue factor...... pathway inhibitor (TFPI) may be deleterious. METHODS: We measured factor VII clotting activity, activated factor VII, and concentrations of factor VII and TFPI during 12 months in healthy post-menopausal women randomized to: (i). cyclic oral estrogen/progestin (n = 25); (ii). long-cycle oral estrogen......: No variations were observed in the reference group. There was a substantial decrease in TFPI concentrations in the HRT groups irrespective of the type of progestin. In women receiving long-cycle treatment, all factor VII measures increased during the unopposed estrogen periods, and the increase was reversed...

  10. Factors Influencing Title VII Bilingual Program Institutionalization.

    Science.gov (United States)

    Lewis, Gerald R.; And Others

    1985-01-01

    This study of the primary restraining and driving forces that influence Title VII bilingual education programs found the external environment, the local community, to be the main factor influencing institutionalization and self-renewal. The internal environment--the local school, and the local school's organization or central office, school board,…

  11. 76 FR 20661 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Science.gov (United States)

    2011-04-13

    ... Activities; Proposed Collection; Comment Request; Contractor Conflicts of Interest AGENCY: Environmental....regulations.gov . Title: Contractor Conflicts of Interest. ICR numbers: EPA ICR No. 1550.09, OMB Control No... control numbers in certain EPA regulations is consolidated in 40 CFR part 9. Abstract: EPA contractors...

  12. 78 FR 79692 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2013-12-31

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9904-94-OW] Clean Water Act; Contractor Access to... Transfer of Confidential Business Information to Contractor, Subcontractors, and Consultants. SUMMARY: The... contractors listed below require access to CBI submitted to EPA under Section 308 of the Clean Water Act (CWA...

  13. Contingency Contractor Optimization Phase 3 Sustainment Database Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, Christopher Rawls; Durfee, Justin David; Bandlow, Alisa; Gearhart, Jared Lee; Jones, Katherine A

    2016-05-01

    The Contingency Contractor Optimization Tool – Prototype (CCOT-P) database is used to store input and output data for the linear program model described in [1]. The database allows queries to retrieve this data and updating and inserting new input data.

  14. 76 FR 57013 - Recordkeeping and Reporting Requirements Under Title VII, the ADA, and GINA

    Science.gov (United States)

    2011-09-15

    ... EQUAL EMPLOYMENT OPPORTUNITY COMMISSION 29 CFR Part 1602 RIN 3046-AA89 Recordkeeping and Reporting Requirements Under Title VII, the ADA, and GINA AGENCY: Equal Employment Opportunity Commission. ACTION... under title VII, the ADA, and GINA. (76 FR 31892, June 2, 2011). No requests to present oral testimony...

  15. 77 FR 13153 - Information Collection; NASA Contractor Financial Management Reports

    Science.gov (United States)

    2012-03-05

    ..., [email protected] . SUPPLEMENTARY INFORMATION: I. Abstract The NASA Contractor Financial Management... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice 12-019] Information Collection; NASA Contractor Financial Management Reports AGENCY: National Aeronautics and Space Administration (NASA). ACTION...

  16. Verification and validation of ACE-format library created from ENDF/B-VII.0

    International Nuclear Information System (INIS)

    Chen Chaobin; Hu Zehua; Zhang Benai; Chen Yixue; Wu Jun

    2009-01-01

    ENDF/B-VII.0, released by the USA Cross Section Evaluation Working Group(CSEWG) in December 2006, was developed in five years since the previous release of ENDF/B-VI.8 and was demonstrated to contain much better physical representations of the data and to perform much better than previus ENDF evaluations over a broad range of applications. We generated ACE-format pointwise cross section library from the ENDF/B-VII.0 neutron reaction sublibrary with the processing code NJOY. The paper provides an overview of ENDF/B-VII.0, a summary of the ACE-format files producing process and a detail description of the validation of the ACE-format library. The conclusion is that the ACE-format library produced is correct. (authors)

  17. Ice-VII inclusions in diamonds: Evidence for aqueous fluid in Earth’s deep mantle

    Science.gov (United States)

    Tschauner, O.; Huang, S.; Greenberg, E.; Prakapenka, V. B.; Ma, C.; Rossman, G. R.; Shen, A. H.; Zhang, D.; Newville, M.; Lanzirotti, A.; Tait, K.

    2018-03-01

    Water-rich regions in Earth’s deeper mantle are suspected to play a key role in the global water budget and the mobility of heat-generating elements. We show that ice-VII occurs as inclusions in natural diamond and serves as an indicator for such water-rich regions. Ice-VII, the residue of aqueous fluid present during growth of diamond, crystallizes upon ascent of the host diamonds but remains at pressures as high as 24 gigapascals; it is now recognized as a mineral by the International Mineralogical Association. In particular, ice-VII in diamonds points toward fluid-rich locations in the upper transition zone and around the 660-kilometer boundary.

  18. 48 CFR 307.108-70 - Telecommuting of contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Telecommuting of... Telecommuting of contractor employees. (a) SOWs/PWSs shall permit offerors or contractors to specify their own... telecommuting) for any part of an SOW/PWS, after determining that the work or any portion thereof must be...

  19. 23 CFR 635.110 - Licensing and qualification of contractors.

    Science.gov (United States)

    2010-04-01

    ... licensing contractors, who may bid for, be awarded, or perform Federal-aid highway contracts, shall be... competition, to prevent submission of a bid by, or to prohibit the consideration of a bid submitted by, any...) No contractor shall be required by law, regulation, or practice to obtain a license before submission...

  20. Dove sta andando l'analisi musicale? Riflessioni sul VII EuroMac

    Directory of Open Access Journals (Sweden)

    Mario Baroni

    2014-01-01

    Full Text Available Come tutti i lettori della Rivista ormai sapranno, si è svolto a Roma dal 29 settembre al 2 ottobre di quest’anno, presso il Conservatorio di S. Cecilia, il settimo convegno europeo di analisi musicale (VII European Music Analysis Conference ossia VII EuroMac. Nel convegno, organizzato dal GATM e diretto da Giorgio Sanguinetti, sono state presentate 197 relazioni e svolti otto laboratori. Tutti i materiali sono stati riassunti in un volume (Programme and Abstract Book, Iter Edizioni di Subiaco curato da Egidio Pozzi e Antonio Cascelli.

  1. Cross-national research on contractor evaluation procedures in public works procurement

    Science.gov (United States)

    Kinoshita, Seiya; Sato, Naoyoshi; Matsumoto, Naoya

    Contractor evaluation methods in Japan's public works procurement, beginning with construction business licensure, going through biennial preliminary firm rating, up to project-by-project prequalification and comprehensive point rating, were developed during the period when public works were mostly procured through designated competitive bidding. It is essential to focus attention on contractor evaluation methods for introducing different types of procurement procedures which enhance the use of technological capabilities held by private businesses. An overall review of contractor evaluation procedures should be conducted in view of the present situation, where the open competitive bidding has become mainly used in combination with comprehensive evaluation, as well as to allow for further diversification of procurement methods. In Western countries, improvements have been made for the past several years in contractor evaluation procedures with more emphasis on "Value for Money." Advanced efforts made by these countries will be useful as a reference for overhauling Japan's contractor evaluation system. This study conducts a comparative review of contractor evaluation procedures for public procurement in Western countries such as the United States, the United Kingdom and France by identifying similarities and differences between those of Japan and the above mentioned countries. This reveals that a contractor's technical or professional ability is looked at separately from its economic and financial standing in those countries studied, and there is no case like Japan in which those two factors are integrated into one for evaluation.

  2. CASMO5 JENDL-4.0 and ENDF/B-VII.1beta4 libraries

    International Nuclear Information System (INIS)

    Rhodes, J.; Gheorghiu, N.; Ferrer, R.

    2012-01-01

    This paper details the generation of neutron data libraries for the CASMO5 lattice physics code based on the recently released JENDL-4.0 and ENDF/B-VII.1beta4 nuclear data evaluations. This data represents state-of-the-art nuclear data for late-2011. The key features of the new evaluations are briefly described along with the procedure for processing of this data into CASMO5, 586-energy group neutron data libraries. Finally some CASMO5 results for standard UO 2 and MOX critical experiments for the two new libraries and the current ENDF/B-VII.0 CASMO5 library are presented including the B and W 1810 series, DIMPLE S06A, S06B, TCA reflector criticals with iron plates and the PNL-30-35 MOX criticals. The results show that CASMO5 with the new libraries is performing well for these criticals with a very slight edge in results to the JENDL-4.0 nuclear data evaluation over the ENDF/B-VII.1beta4 evaluation. Work is currently underway to generate a CASMO5 library based on the final ENDF/B-VII.R1 evaluation released Dec. 22, 2011. (authors)

  3. GANGGUAN CEMAS PADA MAHASISWA SEMESTER I DAN VII PROGRAM STUDI PENDIDIKAN DOKTER FAKULTAS KEDOKTERAN UNIVERSITAS UDAYANA

    Directory of Open Access Journals (Sweden)

    Dyah Chandratika

    2015-05-01

    Full Text Available Penting untuk dilakukan penelitian mengenai gangguan cemas pada mahasiswa kedokteran karena tingginya tingkat stres mahasiswa terutama pada tahun pertama perkuliahan. Tujuan penelitian ini adalah untuk mengetahui prevalensi dan perbedaan skor  gangguan  cemas  pada mahasiswa  semester  I dan  VII serta untuk  mengetahui perbedaan skor gangguan cemas antara mahasiswa laki-laki dan perempuan di Fakultas Kedokteran Universitas Udayana. Desain penelitian ini adalah cross sectional analitik. Pengambilan sampel dilakukan secara random sampling. Sampel mengisi identitas, kuesioner L-MMPI, kuesioner Hamilton Anxiety Rating Scale (HARS. Kemudian dihitung prevalensi gangguan cemas tiap kelompok serta data dianalisis menggunakan uji t-independen. Terdapat 15 orang (25,0% mahasiswa semester I dan 7 orang (11,7% mahasiswa semester VII yang mengalami gangguan cemas. Dari hasil uji t-independen antara skor gangguan cemas mahasiswa semester I dan VII diperoleh nilai p = 0,001 (<0,05. Sedangkan diperoleh p = 0,080 antara mahasiswa laki-laki dan perempuan pada semester I dan p = 0,744 antara mahasiswa laki-laki dan perempuan pada semester VII. Prevalensi gangguan cemas pada mahasiswa semester I yaitu 25,0% sedangkan 11,7% pada mahasiswa semester VII. Terdapat perbedaan bermakna antara skor gangguan cemas mahasiswa semester I dan VII. Tidak ditemukan perbedaan bermakna skor gangguan cemas antara laki-laki dan perempuan.   

  4. Contingency Contractor Optimization Phase 3 Sustainment Third-Party Software List - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    2016-05-01

    The Contingency Contractor Optimization Tool - Prototype (CCOT-P) requires several third-party software packages. These are documented below for each of the CCOT-P elements: client, web server, database server, solver, web application and polling application.

  5. Prophylactic Level VII Nodal Dissection as a Prognostic Factor in Papillary Thyroid Carcinoma: a Pilot Study of 27 Patients.

    Science.gov (United States)

    Fayek, Ihab Samy

    2015-01-01

    Prognostic value of prophylactic level VII nodal dissection in papillary thyroid carcinoma has been highlighted. A total of 27 patients with papillary thyroid carcinoma with N0 neck underwent total thyroidectomy with level VI and VII nodal dissection through same collar neck incision. Multicentricity, bilaterality, extrathyroidal extension, level VI and VII lymph nodes were studied as separate and independent prognostic factors for DFS at 24 months. 21 females and 6 males with a mean age of 34.6 years old, tumor size was 5-24 mm. (mean 12.4 mm.), multicentricity in 11 patients 2-4 foci (mean 2.7), bilaterality in 8 patients and extrathyroidal extension in 8 patients. Dissected level VI LNs 2-8 (mean 5 LNs) and level VII LNs 1-4 (mean 1.9). Metastatic level VI LNs 0-3 (mean 1) and level VII LNs 0-2 (mean 0.5). Follow-up from 6-51 months (mean 25.6) with 7 patients showed recurrence (3 local and 4 distant). Cumulative DFS at 24 months was 87.8% and was significantly affected in relation to bilaterality (p-valueVII positive ((p-valueVII nodal involvement. Level VII prophylactic nodal dissection is an important and integral prognostic factor in papillary thyroid carcinoma. A larger multicenter study is crucial to reach a satisfactory conclusion about the necessity and safety of this approach.

  6. Selection of disposal contractor by multi criteria decision making methods

    Directory of Open Access Journals (Sweden)

    Cenker Korkmazer

    2016-08-01

    Full Text Available Hazardous waste is substance that threaten people and environment in case of improper storage, disposal and transport due to its concentration, physical and chemical properties. Companies producing hazardous waste as a result of several activities mostly do not have any own disposal facilities. In addition, they do not pay attention enough to determine the right contractor as a disposal facility. On the other hand, there are various qualitative and quantitative criteria affecting the selection of the contractor and conflicting with each other. The aim of the performed study is to assist one of these companies producing hazardous waste in the selection of the best contractor that eliminates hazardous waste economic and harmless way. In the study, contractor weights in percentage is calculated by using Analytic Network Process (ANP as one of the multi-criteria decision making (MCDM methods and widely used in the literature which considers both qualitative and quantitative criteria. In the next step, by the help of the mathematical model, contractors that will be given which type of hazardous waste are identified. This integrated approach can be used as a guide for similar firms.

  7. Innovation Strategy in Slovak Forest Contractor Firms—A SWOT Analysis

    Directory of Open Access Journals (Sweden)

    Martina Štěrbová

    2016-05-01

    Full Text Available The aim of the study is to determine the innovation strategy of contractor firms in the Slovak forestry service sector in the area of further innovation activities development. The strategy identification was based on the analysis of the strengths, weaknesses, opportunities and threats in this sector. The results indicate that weaknesses of contractor firms exceed their strengths and, considering the degree and importance of their impact, opportunities exceed identified threats. Based on these findings revealing the relations in the area of innovation activities of forestry service contractors, the “Strategy of Partnership” was suggested as the most suitable type of strategy. It can be concluded that such a form of grouping cooperation brings many benefits to contractors in the form of information availability, guidance, training, and management of conflicts, risks and uncertainty, which are associated with the innovation process.

  8. 77 FR 17098 - Proposed Extension of Existing Information Collection; Independent Contractor Registration and...

    Science.gov (United States)

    2012-03-23

    ... Information Collection; Independent Contractor Registration and Identification AGENCY: Mine Safety and Health...-00040, Independent Contractor Register. OMB last approved this information collection request (ICR) on...); or 202-693-9441 (facsimile). SUPPLEMENTARY INFORMATION: I. Background Independent contractors...

  9. Demonstration of resonant photopumping of Mo VII by Mo XII for a VUV laser near 600 Angstrom

    International Nuclear Information System (INIS)

    Ilcisin, K.J.; Aumayr, F.; Schwob, J.L.; Suckewer, S.

    1993-09-01

    We present data of experiments on the resonant photopumping of Mo VII by Mo XII as a method of generating a coherent VUV source near 600 angstrom. The experiment is based on a scheme proposed by Feldman and Reader in which the 4p 6 -- 4p 5 6s transition in Mo VII in resonantly photopumped by the 5s 2 S 1/2 -- 4p 2 P 1/2 transition in Mo XII. Results of the laser produced plasma experiments show the successful enhancement of the population of the Mo VII 4p 5 6s upper lasing level when pumped by an adjacent Mo VII plasma. No enhancement was seen in a control experiment where the Mo VII plasma was pumped by a Zr X plasma. Improvements of the intensity of the Mo XII pump source, achieved using an additional pump laser, lead to the generation of a population inversion for the VUV transition

  10. New Neutron, Proton, and S(α,β) MCNP Data Libraries Based on ENDF/B-VII

    International Nuclear Information System (INIS)

    Little, Robert C.; Trellue, Holly R.; MacFarlane, Robert E.; Kahler, A.C.; Lee, Mary Beth; White, Morgan C.

    2008-01-01

    The general-purpose Evaluated Nuclear Data File ENDF/B-VII.0 was released in December 2006. A number of sub-libraries were included in ENDF/B-VII.0 such that data were provided for incident neutrons, photons, and charged particles. This paper describes the creation of MCNP data libraries at Los Alamos National Laboratory based on three ENDF/B-VII.0 sub-libraries: neutrons, protons, and thermal scattering. An ACE-formatted continuous-energy neutron data library called ENDF70 for MCNP has been produced. This library provides data for 390 materials at five temperatures: 293.6, 600, 900, 1200, and 2500 K. The library was processed primarily with Version 248 of NJOY99. Extensive checking and quality-assurance tests were applied to the data. Improvements to the processing code were made and certain evaluations were modified as a result of these tests. ENDF/B-VII.0 included proton evaluations for 48 target materials. Forty-seven proton evaluations (all except for 13 C) were processed at room temperature and combined into the MCNP library ENDF70PROT. Neutron thermal S(α,β) scattering data exist for twenty different materials in ENDF/B-VII.0. All twenty of these evaluations were processed at all applicable temperatures (these vary for each evaluation), and combined into the MCNP library ENDF70SAB. All of these ENDF/B-VII.0 based MCNP libraries (ENDF70, ENDF70PROT, and ENDF70SAB) are available as part of the MCNP5 1.50 release. (authors)

  11. 75 FR 43166 - Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients

    Science.gov (United States)

    2010-07-23

    ...] Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients AGENCY: Office... information collection requirement regarding Central Contractor Registration Requirements for Prime Grant... for the proper performance of functions of the Central Contractor Registration Requirements for Prime...

  12. Radiation exposures for DOE and DOE contractor employees, 1989

    International Nuclear Information System (INIS)

    Smith, M.H.; Eschbach, P.A.; Harty, R.; Millet, W.H.; Scholes, V.A.

    1992-12-01

    All US Department of Energy (DOE) and DOE contractors, are required to submit occupational radiation exposure records to a central depository. In 1989, data were required to be submitted for all employees who were required to be monitored in accordance with DOE Order 5480.11 and for all visitors who had a positive exposure. The data required included the external penetrating whole-body dose equivalent, the shallow dose equivalent, and a summary of internal depositions of radioactive material above specified limits. Data regarding the exposed individuals included the individual's age, sex, and occupational category. This report is a summary of the external penetrating whole-body dose equivalents and shallow dose equivalents reported by DOE and DOE contractors for the calendar year 1989. A total of 90,882 DOE and DOE contractor employees were reported to have been monitored for whole-body ionizing radiation exposure during 1989. This represents 53.6% of all DOE and DOE contractor employees and is an increase (4.3 %) from the number of monitored employees for 1988. In addition to the employees, 12,643 visitors were monitored

  13. EDRP public local inquiry, UKAEA/BNFL precognition on: Contractor accommodation

    International Nuclear Information System (INIS)

    Scott, W.

    1986-01-01

    The availability of accommodation for contractors working on the proposed EDRP at Dounreay is discussed. It is predicted that the contractors could be accommodated without the need for special arrangement and with no adverse effect on the tourist industry. (U.K.)

  14. Drawing the critical distinction between independent contractors and permanent employees : the tax implications

    International Nuclear Information System (INIS)

    Bodie, J.S.; Haymour, J.

    1999-01-01

    The many factors that should be considered when distinguishing between an independent contractor and an employee from the perspective of tax laws were discussed. Some of the major areas where disputes regarding relationships between the employee and the independent contractor arise were reviewed with particular emphasis on some of the dangers associated with a change in characterization of these types of relationships. Ways in which to guard against these dangers were also presented. The courts have established the following four tests to determine a contractor's status: (1) the control test, (2) the economic reality test, (3) the business integration test, and (4) the ownership of tools test. The control tests looks to the degree of control that an employer/recipient of services possesses over the work that is to be performed. The economic reality test looks to whether the contractor is actually in business for himself and is risking a loss. The business integration test examines the relationship between employer and contractor in terms of how economically dependent the contractor is on the employer and whether the task the contractor carries on forms an integral part of the business of the employer. The last test examines who owns the tools used by the contractor to carry out his duties. This presentation also reviewed how employers and contractors are responsible for adhering to Revenue Canada tax laws and certain liabilities regarding income taxes, Employment Insurance (EI) premiums, Canada Pension Plan (CPP) contributions and other amounts

  15. Drawing the critical distinction between independent contractors and permanent employees : the tax implications

    Energy Technology Data Exchange (ETDEWEB)

    Bodie, J.S.; Haymour, J. [Fraser Milner, Calgary, AB (Canada)

    1999-07-01

    The many factors that should be considered when distinguishing between an independent contractor and an employee from the perspective of tax laws were discussed. Some of the major areas where disputes regarding relationships between the employee and the independent contractor arise were reviewed with particular emphasis on some of the dangers associated with a change in characterization of these types of relationships. Ways in which to guard against these dangers were also presented. The courts have established the following four tests to determine a contractor's status: (1) the control test, (2) the economic reality test, (3) the business integration test, and (4) the ownership of tools test. The control tests looks to the degree of control that an employer/recipient of services possesses over the work that is to be performed. The economic reality test looks to whether the contractor is actually in business for himself and is risking a loss. The business integration test examines the relationship between employer and contractor in terms of how economically dependent the contractor is on the employer and whether the task the contractor carries on forms an integral part of the business of the employer. The last test examines who owns the tools used by the contractor to carry out his duties. This presentation also reviewed how employers and contractors are responsible for adhering to Revenue Canada tax laws and certain liabilities regarding income taxes, Employment Insurance (EI) premiums, Canada Pension Plan (CPP) contributions and other amounts.

  16. Tissue factor is an angiogenic-specific receptor for factor VII-targeted immunotherapy and photodynamic therapy.

    Science.gov (United States)

    Hu, Zhiwei; Cheng, Jijun; Xu, Jie; Ruf, Wolfram; Lockwood, Charles J

    2017-02-01

    Identification of target molecules specific for angiogenic vascular endothelial cells (VEC), the inner layer of pathological neovasculature, is critical for discovery and development of neovascular-targeting therapy for angiogenesis-dependent human diseases, notably cancer, macular degeneration and endometriosis, in which vascular endothelial growth factor (VEGF) plays a central pathophysiological role. Using VEGF-stimulated vascular endothelial cells (VECs) isolated from microvessels, venous and arterial blood vessels as in vitro angiogenic models and unstimulated VECs as a quiescent VEC model, we examined the expression of tissue factor (TF), a membrane-bound receptor on the angiogenic VEC models compared with quiescent VEC controls. We found that TF is specifically expressed on angiogenic VECs in a time-dependent manner in microvessels, venous and arterial vessels. TF-targeted therapeutic agents, including factor VII (fVII)-IgG1 Fc and fVII-conjugated photosensitizer, can selectively bind angiogenic VECs, but not the quiescent VECs. Moreover, fVII-targeted photodynamic therapy can selectively and completely eradicate angiogenic VECs. We conclude that TF is an angiogenic-specific receptor and the target molecule for fVII-targeted therapeutics. This study supports clinical trials of TF-targeted therapeutics for the treatment of angiogenesis-dependent diseases such as cancer, macular degeneration and endometriosis.

  17. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  18. Integrating Contractors into the Logistics Force

    National Research Council Canada - National Science Library

    Terrell, Ronald G

    2006-01-01

    ... a panacea. For a combatant commander to effectively integrate them with his military force requires an understanding of the operational environment, contractor capabilities, acceptable levels of risk...

  19. Private Military and Security Contractors

    DEFF Research Database (Denmark)

    In Private Military and Security Contractors: Controlling the Corporate Warrior a multinational team of 16 scholars and a practitioner from political science, sociology, and law address a developing phenomenon: controlling the use of privatized force by states in international politics. Robust...

  20. 7 CFR Exhibit A to Subpart I of... - Self-Help Technical Assistance Grant Agreement

    Science.gov (United States)

    2010-01-01

    ...) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE... rights under 7 CFR part 1900, subpart B. (f) An extension of this grant agreement may be approved by FmHA... value from suppliers, contractors, or others doing business with the grantee. To the extent permissible...

  1. 78 FR 23935 - Federal Acquisition Regulation; Information Collection; Contractor Use of Interagency Fleet...

    Science.gov (United States)

    2013-04-23

    ...; Information Collection; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department of... previously approved information collection requirement concerning contractor use of interagency fleet... Collection 9000- 0032, Contractor Use of Interagency Fleet Management System Vehicles, by any of the...

  2. Viis armastuslugu suurel ekraanil / Tristan Priimägi

    Index Scriptorium Estoniae

    Priimägi, Tristan, 1976-

    2008-01-01

    Viis näidet filmiajaloost, kus režissööri ja staari vahel on tunded : Roger Vadim ja Tema Naised, Werner Herzog ja Klaus Kinski, Federico Fellini ja Anita Ekberg, Quentin Tarantino ja Uma Thurman, Rainer Werner Fassbinder ja Mr/Mrs X

  3. How Loud Is Too Loud?

    Medline Plus

    Full Text Available ... Health Resources Clinical Studies Research Extramural Research Intramural Research Scientific Workshop and Meeting Reports Meet NIDCD Scientists and Grantees Research Resources Clinical Studies Funding Types of Grants and ...

  4. 48 CFR 252.237-7023 - Continuation of Essential Contractor Services.

    Science.gov (United States)

    2010-10-01

    ... provide a written plan for continuing the performance of essential contractor services identified in...; and (v) The approach for communicating expectations to contractor employees regarding their roles and... or other designated representative as expeditiously as possible and use its best efforts to cooperate...

  5. 78 FR 29247 - Contractor Legal Management Requirements; Acquisition Regulations; Correction

    Science.gov (United States)

    2013-05-20

    ... DEPARTMENT OF ENERGY 48 CFR Part 952 RIN 1990-AA37 Contractor Legal Management Requirements; Acquisition Regulations; Correction AGENCY: Department of Energy. ACTION: Final rule; correction. SUMMARY: The... (78 FR 25795). In this document, DOE revised existing regulations covering contractor legal management...

  6. Haapsalu 725 : Haapsalu genius loci / Aidi Vallik

    Index Scriptorium Estoniae

    Vallik, Aidi, 1971-

    2004-01-01

    Pidustuste kavas (18.-20. VI, 7.-11. VII, 29. VII-1. VIII) on ka süvakultuuri: 20. VI dirigeerib Eesti-Soome sümfooniaorkestrit Anu Tali, Linnagaleriis juuni lõpuni Jaan Toomiku uute maalide väljapanek, Evald Okase muuseumis augusti lõpuni E. Okase tööde näitus, 27. VI-4. VII klaasipuhumise workshop

  7. 34 CFR 386.34 - What assurances must be provided by a grantee that intends to provide scholarships?

    Science.gov (United States)

    2010-07-01

    ... norm. (ii) A maximum timeframe in which the scholar shall complete the scholar's educational objective... disbursement of scholarship funds to the individual for payment of the individual's expenses, such as tuition... the scholar's failure to meet the obligation of § 386.43. (d) Executed agreement. The grantee will...

  8. Release of the ENDF/B-VII.1 Evaluated Nuclear Data File

    Energy Technology Data Exchange (ETDEWEB)

    Brown, David

    2012-06-30

    The Cross Section Evaluation Working Group (CSEWG) released the ENDF/B-VII.1 library on December 22, 2011. The ENDF/B-VII.1 library is CSEWG's latest recommended evaluated nuclear data file for use in nuclear science and technology applications, and incorporates advances made in the five years since the release of ENDF/B-VII.0, including: many new evaluation in the neutron sublibrary (423 in all and over 190 of these contain covariances), new fission product yields and a greatly improved decay data sublibrary. This summary barely touches on the five years worth of advances present in the ENDF/B-VII.1 library. We expect that these changes will lead to improved integral performance in reactors and other applications. Furthermore, the expansion of covariance data in this release will allow for better uncertainty quantification, reducing design margins and costs. The ENDF library is an ongoing and evolving effort. Currently, the ENDF data community embarking on several parallel efforts to improve library management: (1) The adoption of a continuous integration system to provide evaluators 'instant' feedback on the quality of their evaluations and to provide data users with working 'beta' quality libraries in between major releases. (2) The transition to new hierarchical data format - the Generalized Nuclear Data (GND) format. We expect GND to enable new kinds of evaluated data which cannot be accommodated in the legacy ENDF format. (3) The development of data assimilation and uncertainty propagation techniques to enable the consistent use of integral experimental data in the evaluation process.

  9. The Inadequacy of Existing Far Provisions to Ensure Contractor Environmental Compliance

    National Research Council Canada - National Science Library

    MacDonald, Edward

    1997-01-01

    This thesis focuses on situations where the obligation is on the contractor, and examines the existing FAR provisions and clauses to explore whether they are adequate to ensure government contractor...

  10. 75 FR 71564 - Defense Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS...

    Science.gov (United States)

    2010-11-24

    ... Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS Case 2009-D025... conducting a Contractor Insurance/Pension Review from Procedures, Guidance, and Information (PGI) to the... This final rule relocates requirements for Contractor Insurance/ Pension Review to DFARS 242.7302 from...

  11. 78 FR 60169 - Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee...

    Science.gov (United States)

    2013-09-30

    ... 9000-AM56 Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee... program enhancing whistleblower protections for contractor employees. DATES: Effective: September 30, 2013... contractor employees at FAR subpart 3.9. The pilot program is mandated by section 828, entitled ``Pilot...

  12. Site contractor participation in the DOE SWEIS process at Los Alamos, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Pendergrass, A.; Garvey, D.

    1997-12-01

    The U.S. Department of Energy (DOE) prepares site-wide environmental impact statements (SWEIS) on sites that are to remain in operation in order to provide an estimate of the cumulative environmental impacts from projected future operations at the site. DOE has relied on outside contractors rather than the site management and operating (M&O) contractors to prepare EISs, in order to preclude the potential for conflict of interest. The site M&O contractors, who know the potential for conflict of interest. The site M&O contractors, who know the site best and are most familiar with existing information, are critical support for the contractor. The University of California (UC) is the site M&O contractor for Los Alamos National Laboratory (LANL) in Los Alamos, NM. The role of LANL (UC) personnel in DOE`s preparation process for the LANL SWEIS is described. 3 refs.

  13. Beyond the design fix - New industrialisation in contractor's supplier relationships

    DEFF Research Database (Denmark)

    Koch, Christian; Frödell, M.; Josephson, P.E.

    2010-01-01

    by the Erabuild program, this paper presents 3 cases of long term transformation of contractor- supplier relations as general contractors outsource and commence professionalising purchasing moving it from project purchasing into strategic purchasing. It is suggested that “new industrialisation” is a long term...

  14. 48 CFR 509.308-1 - Testing performed by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Testing performed by the... ADMINISTRATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 509.308-1 Testing performed by the contractor. In FSS solicitations and contracts that will require...

  15. Contractor-style tunnel cost estimating

    International Nuclear Information System (INIS)

    Scapuzzi, D.

    1990-06-01

    Keeping pace with recent advances in construction technology is a challenge for the cost estimating engineer. Using an estimating style that simulates the actual construction process and is similar in style to the contractor's estimate will give a realistic view of underground construction costs. For a contractor-style estimate, a mining method is chosen; labor crews, plant and equipment are selected, and advance rates are calculated for the various phases of work which are used to determine the length of time necessary to complete each phase of work. The durations are multiplied by the cost or labor and equipment per unit of time and, along with the costs for materials and supplies, combine to complete the estimate. Variations in advance rates, ground support, labor crew size, or other areas are more easily analyzed for their overall effect on the cost and schedule of a project. 14 figs

  16. Conserved water-mediated hydrogen bond network between TM-I, -II, -VI, and -VII in 7TM receptor activation

    DEFF Research Database (Denmark)

    Nygaard, Rie; Hansen, Louise Valentin; Mokrosinski, Jacek

    2010-01-01

    Five highly conserved polar residues connected by a number of structural water molecules together with two rotamer micro-switches, TrpVI:13 and TyrVII:20, constitute an extended hydrogen bond network between the intracellular segments of TM-I, -II, -VI, and -VII of 7TM receptors. Molecular dynamics...... to apparently function as a catching trap for water molecules. Mutational analysis of the beta2-adrenergic receptor demonstrated that the highly conserved polar residues of the hydrogen bond network were all important for receptor signaling but served different functions, some dampening constitutive activity...... (AsnI:18, AspII:10, and AsnVII:13), whereas others (AsnVII:12 and AsnVII:16) located one helical turn apart and sharing a water molecule were shown to be essential for agonist-induced signaling. It is concluded that the conserved water hydrogen bond network of 7TM receptors constitutes an extended...

  17. 78 FR 4425 - Notice of Proposed Information Collection: Comment Request; Multifamily Contractor's Mortgagor's...

    Science.gov (United States)

    2013-01-22

    ... Information Collection: Comment Request; Multifamily Contractor's Mortgagor's Cost Breakdowns and... comments on the subject proposal. Contractors use the form HUD-2328 to establish a schedule of values of construction items on which the monthly advances or mortgage proceeds are based. Contractors use the form HUD...

  18. 76 FR 68017 - Federal Acquisition Regulation; Preventing Personal Conflicts of Interest for Contractor...

    Science.gov (United States)

    2011-11-02

    ... Contractor Employees Performing Acquisition Functions AGENCIES: Department of Defense (DoD), General Services... personal conflicts of interest by employees of Government contractors as required by statute. DATES... clause for future orders. In the event that a contractor refuses to accept such a modification, the...

  19. 75 FR 55671 - Financial Assistance Use of Universal Identifier and Central Contractor Registration

    Science.gov (United States)

    2010-09-14

    ... of Universal Identifier and Central Contractor Registration AGENCY: Office of Federal Financial...) numbers and maintain current registrations in the Central Contractor Registration (CCR) database. An... CONTRACTOR REGISTRATION Sec. Subpart A--General 25.100 Purposes of this part. 25.105 Types of awards to which...

  20. Contractors In The Theater: Implications For Joint Operational Planning And Execution

    National Research Council Canada - National Science Library

    Binder, Jeanne

    2003-01-01

    The use of contractors in the theater of operations is nothing new. However downsizing efforts and outsourcing as well as the increasing complexity of military equipment has increased military reliance on contractors...

  1. Type VII collagen is enriched in the enamel organic matrix associated with the dentin-enamel junction of mature human teeth.

    Science.gov (United States)

    McGuire, Jacob D; Walker, Mary P; Mousa, Ahmad; Wang, Yong; Gorski, Jeff P

    2014-06-01

    The inner enamel region of erupted teeth is known to exhibit higher fracture toughness and crack growth resistance than bulk phase enamel. However, an explanation for this behavior has been hampered by the lack of compositional information for the residual enamel organic matrix. Since enamel-forming ameloblasts are known to express type VII collagen and type VII collagen null mice display abnormal amelogenesis, the aim of this study was to determine whether type VII collagen is a component of the enamel organic matrix at the dentin-enamel junction (DEJ) of mature human teeth. Immunofluorescent confocal microscopy of demineralized tooth sections localized type VII collagen to the organic matrix surrounding individual enamel rods near the DEJ. Morphologically, immunoreactive type VII collagen helical-bundles resembled the gnarled-pattern of enamel rods detected by Coomassie Blue staining. Western blotting of whole crown or enamel matrix extracts also identified characteristic Mr=280 and 230 kDa type VII dimeric forms, which resolved into 75 and 25 kDa bands upon reduction. As expected, the collagenous domain of type VII collagen was resistant to pepsin digestion, but was susceptible to purified bacterial collagenase. These results demonstrate the inner enamel organic matrix in mature teeth contains macromolecular type VII collagen. Based on its physical association with the DEJ and its well-appreciated capacity to complex with other collagens, we hypothesize that enamel embedded type VII collagen fibrils may contribute not only to the structural resilience of enamel, but may also play a role in bonding enamel to dentin. Copyright © 2014 Elsevier Inc. All rights reserved.

  2. 34 CFR 350.63 - What are the requirements of a grantee relative to the Client Assistance Program?

    Science.gov (United States)

    2010-07-01

    ... Client Assistance Program? 350.63 Section 350.63 Education Regulations of the Offices of the Department... After an Award? § 350.63 What are the requirements of a grantee relative to the Client Assistance... representatives, of the availability and purposes of the Client Assistance Program (CAP) funded under the Act; and...

  3. Contractor Development Models for Promoting Sustainable Building – a case for developing management capabilities of contractors

    CSIR Research Space (South Africa)

    Dlungwana, Wilkin S

    2004-11-01

    Full Text Available Construction industry and indeed all small and medium-sized contractors play a significant socio-economic role in the developing countries. This paper highlights the importance of promoting sustainable building through the implementation...

  4. 48 CFR 2052.209-72 - Contractor organizational conflicts of interest.

    Science.gov (United States)

    2010-10-01

    ... conflicts of interest. 2052.209-72 Section 2052.209-72 Federal Acquisition Regulations System NUCLEAR... Clauses 2052.209-72 Contractor organizational conflicts of interest. As prescribed at 2009.570-5(a) and..., contracts, and simplified acquisitions of the types described; 2009.570-4(b): Contractor Organizational...

  5. Analysis of the 4d9-(4d86p + 4p54d10) transitions of Sb VII and the strongest transitions of the 4d9-4d84f array of Sb VII and Te VIII

    International Nuclear Information System (INIS)

    Kildiyarova, R.R.; Churilov, S.S.; Joshi, Y.N.; Ryabtsev, A.N.

    1995-01-01

    The spectra of antimony and tellurium were photographed in the 100-200 A region on grazing incidence spectrographs at Moscow, Russia and NIST, U.S.A. laboratories. The 4d 9 -[4d 8 6p + 4p 5 4d 10 ] transition array of Sb VII was analyzed. 31 levels in Sb VII were established. 41 new lines in Sb VII belonging to the 4d 9 -(4p 5 4d 10 + 4d 8 6p) transition array have been classified. Seven lines each in Sb VII and Te VIII belonging to the 4d 9 -4d 8 4f transition array have been classified. Parametric least-squares-fitted calculations involving configuration interaction have been carried out to interpret the spectrum satisfactorily. (orig.)

  6. 48 CFR 252.247-7016 - Contractor liability for loss or damage.

    Science.gov (United States)

    2010-10-01

    ... the Contractor's negligence, indemnification shall be at a rate not to exceed sixty cents per pound per article. (ii) Negligent damage. When loss or damage is caused by the negligence of the Contractor...

  7. Military Contractors - Too Much Dependence

    Science.gov (United States)

    2008-03-19

    promotes integrity, physical strength, health, unity, cooperation and teamwork. It combats stereotyping and sexual harassment. It fosters in its...weeklyreport108-000001337290&type= toc &num=115&; accessed 15 Jan 2008. 20 U.S. Department of the Army, Contractors on the Battlefield, Field Manual 3

  8. Proceedings of the fuels technology contractors review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Malone, R.D. [ed.

    1993-11-01

    The Fuels Technology Contractors Review Meeting was held November 16-18, 1993, at the Morgantown Energy Technology Center (METC) in Morgantown, West Virginia. This meeting was sponsored and hosted by METC, the Office of Fossil Energy, U.S. Department of Energy (DOE). METC periodically provides an opportunity to bring together all of the R&D participants in a DOE-sponsored contractors review meeting to present key results of their research and to provide technology transfer to the active research community and to the interested public. This meeting was previously called the Natural Gas Technology Contractors Review Meeting. This year it was expanded to include DOE-sponsored research on oil shale and tar sands and so was retitled the Fuels Technology Contractors Review Meeting. Current research activities include efforts in both natural gas and liquid fuels. The natural gas portion of the meeting included discussions of results summarizing work being conducted in fracture systems, both natural and induced; drilling, completion, and stimulation research; resource characterization; delivery and storage; gas to liquids research; and environmental issues. The meeting also included project and technology summaries on research in oil shale, tar sands, and mild coal gasification, and summaries of work in natural-gas fuel cells and natural-gas turbines. The format included oral and poster session presentations. Individual papers have been processed separately for inclusion in the Energy Science and Technology database.

  9. Developing workshop module of realistic mathematics education: Follow-up workshop

    Science.gov (United States)

    Palupi, E. L. W.; Khabibah, S.

    2018-01-01

    Realistic Mathematics Education (RME) is a learning approach which fits the aim of the curriculum. The success of RME in teaching mathematics concepts, triggering students’ interest in mathematics and teaching high order thinking skills to the students will make teachers start to learn RME. Hence, RME workshop is often offered and done. This study applied development model proposed by Plomp. Based on the study by RME team, there are three kinds of RME workshop: start-up workshop, follow-up workshop, and quality boost. However, there is no standardized or validated module which is used in that workshops. This study aims to develop a module of RME follow-up workshop which is valid and can be used. Plopm’s developmental model includes materials analysis, design, realization, implementation, and evaluation. Based on the validation, the developed module is valid. While field test shows that the module can be used effectively.

  10. Critical Electronic Data Loss Perceptions of United States Military Contractors

    Science.gov (United States)

    Singletary, Tod J.

    2017-01-01

    The United States Military has become increasingly dependent upon technology to meet its mission objectives with a consequence being greater dependence on civilian defense contractors to provide specialized services in support of high-tech mission requirements. Modern military defense contractors have also become dependent upon reliable and secure…

  11. 48 CFR 52.209-3 - First Article Approval-Contractor Testing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false First Article Approval... Clauses 52.209-3 First Article Approval—Contractor Testing. As prescribed in 9.308-1 (a) and (b), insert the following clause: First Article Approval—Contractor Testing (SEP 1989) [Contracting Officer shall...

  12. Appeals - Redetermination by a Medicare Contractor

    Data.gov (United States)

    U.S. Department of Health & Human Services — A redetermination is an examination of a claim by the fiscal intermediary (FI), carrier, or Medicare Administrative Contractor (MAC) personnel who are different from...

  13. Creating Fantastic PI Workshops

    Energy Technology Data Exchange (ETDEWEB)

    Biedermann, Laura B. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Clark, Blythe G. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Colbert, Rachel S. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Dagel, Amber Lynn [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gupta, Vipin P. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hibbs, Michael R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Perkins, David Nikolaus [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); West, Roger Derek [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-10-01

    The goal of this SAND report is to provide guidance for other groups hosting workshops and peerto-peer learning events at Sandia. Thus this SAND report provides detail about our team structure, how we brainstormed workshop topics and developed the workshop structure. A Workshop “Nuts and Bolts” section provides our timeline and check-list for workshop activities. The survey section provides examples of the questions we asked and how we adapted the workshop in response to the feedback.

  14. Effective treatment of chemoresistant breast cancer in vitro and in vivo by a factor VII-targeted photodynamic therapy.

    Science.gov (United States)

    Duanmu, J; Cheng, J; Xu, J; Booth, C J; Hu, Z

    2011-04-26

    The purpose of this study was to test a novel, dual tumour vascular endothelial cell (VEC)- and tumour cell-targeting factor VII-targeted Sn(IV) chlorin e6 photodynamic therapy (fVII-tPDT) by targeting a receptor tissue factor (TF) as an alternative treatment for chemoresistant breast cancer using a multidrug resistant (MDR) breast cancer line MCF-7/MDR. The TF expression by the MCF-7/MDR breast cancer cells and tumour VECs in MCF-7/MDR tumours from mice was determined separately by flow cytometry and immunohistochemistry using anti-human or anti-murine TF antibodies. The efficacy of fVII-tPDT was tested in vitro and in vivo and was compared with non-targeted PDT for treatment of chemoresistant breast cancer. The in vitro efficacy was determined by a non-clonogenic assay using crystal violet staining for monolayers, and apoptosis and necrosis were assayed to elucidate the underlying mechanisms. The in vivo efficacy of fVII-tPDT was determined in a nude mouse model of subcutaneous MCF-7/MDR tumour xenograft by measuring tumour volume. To our knowledge, this is the first presentation showing that TF was expressed on tumour VECs in chemoresistant breast tumours from mice. The in vitro efficacy of fVII-tPDT was 12-fold stronger than that of ntPDT for MCF-7/MDR cancer cells, and the mechanism of action involved induction of apoptosis and necrosis. Moreover, fVII-tPDT was effective and safe for the treatment of chemoresistant breast tumours in the nude mouse model. We conclude that fVII-tPDT is effective and safe for the treatment of chemoresistant breast cancer, presumably by simultaneously targeting both the tumour neovasculature and chemoresistant cancer cells. Thus, this dual-targeting fVII-tPDT could also have therapeutic potential for the treatment of other chemoresistant cancers.

  15. Human Resources Staffing Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    BOSLEY, J.W.

    2000-01-01

    The Human Resources Staffing Plan quantified the equivalent staffing needs required for the Tank Farm Contractor (TFC) and its subcontractors to execute the readiness to proceed baseline between FY 2000-2008. The TFC staffing needs were assessed along with the staffings needs of Fluor Hanford and the privatization contractor. The plan then addressed the staffing needs and recruitment strategies required to execute the baseline

  16. 34 CFR 628.45 - How much endowment fund income may a grantee use and for what purposes?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false How much endowment fund income may a grantee use and for what purposes? 628.45 Section 628.45 Education Regulations of the Offices of the Department of... necessary because of— (1) A financial emergency such as a pending insolvency or temporary liquidity problem...

  17. Application of integrated fuzzy VIKOR & AHP methodology to contractor ranking

    Directory of Open Access Journals (Sweden)

    Mohamad Rahim Ramezaniyan

    2012-08-01

    Full Text Available Contractor selection is a critical activity, which plays an important role in the overall success of any construction project. The implementation of fuzzy multiple criteria decision attribute (MCDA in selecting contractors has the advantage of rendering subjective and implicit decision making more objective and transparent. An additional merit of fuzzy MCDA is the ability to accommodate quantitative and qualitative information. In this paper, an integrated VIKOR–AHP methodology is proposed to make a selection among the alternative contractors in one of Iranian construction industry projects. In the proposed methodology, the weights of the selection criteria are determined by fuzzy pairwise comparison matrices of AHP.

  18. 48 CFR 836.501 - Performance of work by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance of work by the... Performance of work by the contractor. The contracting officer shall insert the clause at 852.236-72, Performance of work by the contractor, in solicitations and contracts for construction that contain the FAR...

  19. 48 CFR 9.308-1 - Testing performed by the contractor.

    Science.gov (United States)

    2010-10-01

    ... the contractor. (a)(1) The contracting officer shall insert the clause at 52.209-3, First Article... it is intended that the contract require (i) first article approval and (ii) that the contractor be... produce the first article and the production quantity at the same facility, the contracting officer shall...

  20. Viis aastakümmet raamatukogunduse radadel / Anne Veinberg

    Index Scriptorium Estoniae

    Veinberg, Anne

    2008-01-01

    Arvustus: Kikas, Konrad. Verba volant, scripta manent : viis aastakümmet raamatukogunduse ja infoteaduse radadel = Verba volant, scripta manent : five decades on the field of librarianship and information science. - Tallinn : Tallinna Tehnikaülikooli Kirjastus, 2008. - 366 lk. : ill. portr. - (Tallinna Tehnikaülikooli Raamatukogu töid. A ; 5)

  1. 76 FR 37353 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Business Ethics Compliance...

    Science.gov (United States)

    2011-06-27

    ...; Submission for OMB Review; Contractor Business Ethics Compliance Program and Disclosure Requirements AGENCIES... contractor business ethics compliance program and disclosure requirements. Public comments are particularly... Information Collection 9000- 0164, Contractor Business Ethics Compliance Program and Disclosure Requirements...

  2. 48 CFR 36.501 - Performance of work by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Performance of work by the... Performance of work by the contractor. (a) To assure adequate interest in and supervision of all work involved... contracting officer shall insert the clause at 52.236-1, Performance of Work by the Contractor, in...

  3. 76 FR 73564 - Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration

    Science.gov (United States)

    2011-11-29

    ... Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration AGENCIES... Procurement Data System (FPDS). Additionally, changes are proposed for the clauses requiring contractor registration in the Central Contractor Registration (CCR) database and DUNS number reporting. DATES: Interested...

  4. Farm Building Contractors and Manufacturers: Their Role in Midwest Farm Construction

    Science.gov (United States)

    Lyle Solverson; David C. Baumgartner

    1974-01-01

    Describes and analyzes the activities of farm building contractors and manufacturers in Illinois, Indiana, Iowa, and Missouri. Contractors and manufacturers are setting the trend in the farm building market in terms of building type and size and materials used.

  5. 5 CFR 1320.5 - General requirements.

    Science.gov (United States)

    2010-01-01

    ... received under § 1320.8(d) and § 1320.11; (iii) Submitted to the Director, in accordance with such... provide for any payment or gift to respondents, other than remuneration of contractors or grantees; (E) A... agency has obtained from the Director a control number to be displayed upon the collection of information...

  6. 77 FR 14490 - Defense Federal Acquisition Regulation Supplement: Alleged Crimes By or Against Contractor...

    Science.gov (United States)

    2012-03-12

    ... Federal Acquisition Regulation Supplement: Alleged Crimes By or Against Contractor Personnel (DFARS Case... (DFARS) to expand coverage on contractor requirements and responsibilities relating to alleged crimes by or against contractor personnel. DATES: Comment Date: Comments on the proposed rule should be...

  7. Operator/contractor relationships

    International Nuclear Information System (INIS)

    Smith, J.R.; Kidwell, C.K.; Unger, V.E.; Fercho, E.; Helmer, C.M.

    1992-01-01

    In May 1988, Shell Western E and P Inc. (SWEPI) and partners Elf Aquitaine Petroleum and Conoco Inc. signed a letter of intent with Canadian Marine Drilling Ltd. (Canmar) for provision of exploratory drilling and marine services on leases in OCS Lease Sale 109 in the Chukchi Sea, Alaska. The 5450 blocks offered in the remote sale area west of Point Barrow ranged from 3 to 240 miles (5 to 380 km) offshore in water depths from 26 to 263 feet (8 to 80 m). The principal interest tracts were at least 75 miles (120 km) offshore and north of 70 degrees N latitude. The remoteness and total lack of any oilfield infrastructure required considerable planning and coordination between Operator and Contractor in order to carry out the three-year drilling program efficiently and safely in an environmentally harsh and, at the same time, sensitive area. SWEPI and Canmar developed a close working relationship from the start of the project through a number of participative approaches to the problems that had to be solved. This paper reports that these included strong reliance on operational planning meetings, post-season analyses, and an overall emphasis on the teamwork required of both parties to carry out the first-ever drilling program in the Chukchi Sea. This approach led to a very successful operation for both parties and emphasizes the positive benefits achievable when Operator and Contractor work as a team

  8. 77 FR 59339 - Contractor Qualifications

    Science.gov (United States)

    2012-09-27

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 209 Contractor Qualifications CFR Correction In Title 48 of the Code of Federal Regulations, Chapter 2 (Parts 201-299), revised as of October 1, 2011, on page 55, in section 209.104-70, paragraph (a) is amended by revising the...

  9. Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-06-01

    Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of the program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment

  10. Modifying EPA radiation risk models based on BEIR VII

    International Nuclear Information System (INIS)

    Pawel, D.; Puskin, J.

    2007-01-01

    This paper summarizes a 'draft White Paper' that provides details on proposed changes in EPA's methodology for estimating radiogenic cancer risks. Many of the changes are based on the contents of a recent National Academy of Sciences (NAS) report (BEIR VII), that addresses cancer and genetic risks from low doses of low-LET radiation. The draft White Paper was prepared for a meeting with the EPA's Science Advisory Board's Radiation Advisory Committee (RAC) in September for seeking advice on the application of BEIR VII and on issues relating to these modifications and expansions. After receiving the Advisory review, we plan to implement the changes by publishing the new methodology in an EPA report, which we expect to submit to the RAC for final review. The revised methodology could then be applied to update the cancer risk coefficients for over 800 radionuclides that are published in EPA's Federal Guidance Report 13. (author)

  11. Proceedings of the 1987 coatings for advanced heat engines workshop

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    This Workshop was conducted to enhance communication among those involved in coating development for improved heat engine performance and durability. We were fortunate to have Bill Goward review the steady progress and problems encountered along the way in the use of thermal barrier coatings (TBC) in aircraft gas turbine engines. Navy contractors discussed their work toward the elusive goal of qualifying TBC for turbine airfoil applications. In the diesel community, Caterpillar and Cummins are developing TBC for combustion chamber components as part of the low heat rejection diesel engine concept. The diesel engine TBC work is based on gas turbine technology with a goal of more than twice the thickness used on gas turbine engine components. Adoption of TBC in production for diesel engines could justify a new generation of plasma spray coating equipment. Increasing interests in tribology were evident in this Workshop. Coatings have a significant role in reducing friction and wear under greater mechanical loadings at higher temperatures. The emergence of a high temperature synthetic lubricant could have an enormous impact on diesel engine design and operating conditions. The proven coating processes such as plasma spray, electron-beam physical vapor deposition, sputtering, and chemical vapor deposition have shown enhanced capabilities, particularly with microprocessor controls. Also, the newer coating schemes such as ion implantation and cathodic arc are demonstrating intriguing potential for engine applications. Coatings will play an expanding role in higher efficiency, more durable heat engines.

  12. A rare combination: congenital factor VII deficiency with Chiari malformation.

    Science.gov (United States)

    Bay, Ali; Aktekin, Elif; Erkutlu, Ibrahim

    2015-12-01

    Congenital factor (VII) deficiency is a rare bleeding disorder. We present a patient with congenital FVII deficiency and congenital hydrocephalus who underwent a ventriculoperitoneal shunt operation and needed no prophylaxis after the procedure.

  13. Workshops as a Research Methodology

    Science.gov (United States)

    Ørngreen, Rikke; Levinsen, Karin

    2017-01-01

    This paper contributes to knowledge on workshops as a research methodology, and specifically on how such workshops pertain to e-learning. A literature review illustrated that workshops are discussed according to three different perspectives: workshops as a means, workshops as practice, and workshops as a research methodology. Focusing primarily on…

  14. 78 FR 68060 - Availability of FY 12 Grantee Performance Evaluation Reports for the Eight States of EPA Region 4...

    Science.gov (United States)

    2013-11-13

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9902-81--Region 4] Availability of FY 12 Grantee Performance Evaluation Reports for the Eight States of EPA Region 4 and 17 Local Agencies AGENCY: Environmental... evaluation reports. SUMMARY: EPA's grant regulations require the Agency to evaluate the performance of...

  15. Defense Primer: DOD Contractors

    Science.gov (United States)

    2017-02-10

    functions, from intelligence analysis or software development to landscaping or food service. Why does DOD use individual contractors? Going back to...that provide professional services, from research to management support. The bulk of contractors—more than 70%—provide products, and these include...10 U.S.C. Part IV: Service, Supply, and Procurement. CRS Products CRS In Focus IF10548, Defense Primer: U.S. Defense Industrial Base, by Daniel

  16. Metabolic Engineering VII Conference

    Energy Technology Data Exchange (ETDEWEB)

    Kevin Korpics

    2012-12-04

    The aims of this Metabolic Engineering conference are to provide a forum for academic and industrial researchers in the field; to bring together the different scientific disciplines that contribute to the design, analysis and optimization of metabolic pathways; and to explore the role of Metabolic Engineering in the areas of health and sustainability. Presentations, both written and oral, panel discussions, and workshops will focus on both applications and techniques used for pathway engineering. Various applications including bioenergy, industrial chemicals and materials, drug targets, health, agriculture, and nutrition will be discussed. Workshops focused on technology development for mathematical and experimental techniques important for metabolic engineering applications will be held for more in depth discussion. This 2008 meeting will celebrate our conference tradition of high quality and relevance to both industrial and academic participants, with topics ranging from the frontiers of fundamental science to the practical aspects of metabolic engineering.

  17. Uudised : Baltimaade suurim, XII "Jazzkaar". VII rahvusvaheline koorifestival. Leipzigis improviseeriti edukalt

    Index Scriptorium Estoniae

    2001-01-01

    23.-29. apr. toimuvast festivalist "Jazzkaar 2001". VII rahvusvahelisest koorifestivalist "Tallinn "2001". 6. ja 7. apr. Leipzigis toimunud V rahvusvahelisest improvisatsioonikonkursist, kus osalesid ka eesti interpreedid

  18. Structured Transition of Wind Tunnel Operations Skills from Government-to Contractor-Managed

    Science.gov (United States)

    Dunn, Steven C.; Schlank, John J.

    2010-01-01

    In 2004, NASA awarded the Research, Operations, Maintenance, and Engineering (ROME) contract at NASA Langley Research Center to a team led by Jacobs Technology, Inc. A key component of the contract was the transitioning of the five large wind tunnel facilities from NASA managed and NASA or NASA/contractor workforces to fully contractor operated. The contractor would manage daily operations while NASA would continue to develop long-term strategies, make decisions regarding commitment of funds and commitment of facilities, and provide oversight of the contractor's performance. A major challenge would be the transition of knowledge of facility operations and maintenance from the incumbent civil servant workforce to the contractor workforce. While the contract has since been modified multiple times, resulting in a blended NASA/ROME workforce across the facilities, the processes developed and implemented to capture and document facility knowledge from the incumbent subject matter experts, build training and certification programs, and grow individual skills across subject areas and across facilities, are worthy of documentation. This is the purpose of this paper.

  19. 48 CFR 1845.7101-5 - Contractor's privileged financial and business information.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor's privileged financial and business information. 1845.7101-5 Section 1845.7101-5 Federal Acquisition Regulations System... 1845.7101-5 Contractor's privileged financial and business information. If a transfer of property...

  20. 77 FR 10461 - Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor Excise...

    Science.gov (United States)

    2012-02-22

    ... Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor Excise Tax AGENCIES.... Additionally, the law stipulates that no funds are to be disbursed to any foreign contractor in order to... payment. Additionally, the law stipulates that no funds are to be disbursed to any foreign contractor in...

  1. MOOC Design Workshop

    DEFF Research Database (Denmark)

    Nørgård, Rikke Toft; Mor, Yishay; Warburton, Steven

    2016-01-01

    For the last two years we have been running a series of successful MOOC design workshops. These workshops build on previous work in learning design and MOOC design patterns. The aim of these workshops is to aid practitioners in defining and conceptualising educational innovations (predominantly......, but not exclusively MOOCs) which are based on an empathic user-centered view of the target learners and teachers. In this paper, we share the main principles, patterns and resources of our workshops and present some initial results for their effectiveness...

  2. Joint US Geological Survey, US Nuclear Regulatory Commission workshop on research related to low-level radioactive waste disposal, May 4-6, 1993, National Center, Reston, Virginia; Proceedings

    Science.gov (United States)

    Stevens, Peter R.; Nicholson, Thomas J.

    1996-01-01

    This report contains papers presented at the "Joint U.S. Geological Survey (USGS) and U.S. Nuclear Regulatory Commission (NRC) Technical Workshop on Research Related to Low-Level Radioactive Waste (LLW) Disposal" that was held at the USGS National Center Auditorium, Reston, Virginia, May 4-6, 1993. The objective of the workshop was to provide a forum for exchange of information, ideas, and technology in the geosciences dealing with LLW disposal. This workshop was the first joint activity under the Memorandum of Understanding between the USGS and NRC's Office of Nuclear Regulatory Research signed in April 1992.Participants included invited speakers from the USGS, NRC technical contractors (U.S. Department of Energy (DOE) National Laboratories and universities) and NRC staff for presentation of research study results related to LLW disposal. Also in attendance were scientists from the DOE, DOE National Laboratories, the U.S. Environmental Protection Agency, State developmental and regulatory agencies involved in LLW disposal facility siting and licensing, Atomic Energy Canada Limited (AECL), private industry, Agricultural Research Service, universities, USGS and NRC.

  3. A new automated method for continuous registration of factor VII activation in vitro. Activation is accelerated by the concentration of factor VII and the activity state of the protein

    DEFF Research Database (Denmark)

    Bladbjerg, Else-Marie; Jespersen, J; Gram, J

    1994-01-01

    When a plasma sample is exposed to tissue factor, single-chain factor VII (FVII) is gradually converted to the active two-chain form (FVIIa). In the present study, we have constructed a measurement system, which allows continuous registration of the activation of FVII to FVIIa in vitro....... In this system, FVII activation follows parabolic kinetic after an initial lag-phase. The slope of the linear phase is a measure of the protein concentration of factor VII (FVIItotal), while the length of the non-linear phase represents the velocity of FVII activation. The time required for complete activation...

  4. 76 FR 52378 - Privacy Act; System of Records: State-76, Personal Services Contractor Records

    Science.gov (United States)

    2011-08-22

    ... Services Contractor Records SUMMARY: Notice is hereby given that the Department of State proposes to create a new system of records, Personal Services Contractor Records, State-76, pursuant to the provisions... July 20, 2011. It is proposed that the new system be named ``Personal Services Contractor Records.'' It...

  5. 48 CFR 225.7303-1 - Contractor sales to other foreign customers.

    Science.gov (United States)

    2010-10-01

    ... foreign customers. 225.7303-1 Section 225.7303-1 Federal Acquisition Regulations System DEFENSE... for Foreign Military Sales 225.7303-1 Contractor sales to other foreign customers. If the contractor has made sales of the item required for the foreign military sale to foreign customers under...

  6. 20 CFR 668.700 - What process must an INA grantee use to plan its employment and training services?

    Science.gov (United States)

    2010-04-01

    ... it uses to plan other activities and services. (b) However, in the process of preparing its Two Year... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What process must an INA grantee use to plan its employment and training services? 668.700 Section 668.700 Employees' Benefits EMPLOYMENT AND...

  7. Human Adenovirus Infection Causes Cellular E3 Ubiquitin Ligase MKRN1 Degradation Involving the Viral Core Protein pVII.

    Science.gov (United States)

    Inturi, Raviteja; Mun, Kwangchol; Singethan, Katrin; Schreiner, Sabrina; Punga, Tanel

    2018-02-01

    Human adenoviruses (HAdVs) are common human pathogens encoding a highly abundant histone-like core protein, VII, which is involved in nuclear delivery and protection of viral DNA as well as in sequestering immune danger signals in infected cells. The molecular details of how protein VII acts as a multifunctional protein have remained to a large extent enigmatic. Here we report the identification of several cellular proteins interacting with the precursor pVII protein. We show that the cellular E3 ubiquitin ligase MKRN1 is a novel precursor pVII-interacting protein in HAdV-C5-infected cells. Surprisingly, the endogenous MKRN1 protein underwent proteasomal degradation during the late phase of HAdV-C5 infection in various human cell lines. MKRN1 protein degradation occurred independently of the HAdV E1B55K and E4orf6 proteins. We provide experimental evidence that the precursor pVII protein binding enhances MKRN1 self-ubiquitination, whereas the processed mature VII protein is deficient in this function. Based on these data, we propose that the pVII protein binding promotes MKRN1 self-ubiquitination, followed by proteasomal degradation of the MKRN1 protein, in HAdV-C5-infected cells. In addition, we show that measles virus and vesicular stomatitis virus infections reduce the MKRN1 protein accumulation in the recipient cells. Taken together, our results expand the functional repertoire of the HAdV-C5 precursor pVII protein in lytic virus infection and highlight MKRN1 as a potential common target during different virus infections. IMPORTANCE Human adenoviruses (HAdVs) are common pathogens causing a wide range of diseases. To achieve pathogenicity, HAdVs have to counteract a variety of host cell antiviral defense systems, which would otherwise hamper virus replication. In this study, we show that the HAdV-C5 histone-like core protein pVII binds to and promotes self-ubiquitination of a cellular E3 ubiquitin ligase named MKRN1. This mutual interaction between the pVII and

  8. How Loud Is Too Loud?

    Medline Plus

    Full Text Available ... Extramural Research Intramural Research Scientific Workshop and Meeting Reports Meet NIDCD Scientists and Grantees Research Resources Clinical ... changes brain function, study finds: Early damage could open door to dementia, lead author says ( 5/22/ ...

  9. 77 FR 12313 - Food Labeling Workshop; Public Workshop

    Science.gov (United States)

    2012-02-29

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2012-N-0001] Food Labeling Workshop; Public Workshop AGENCY: Food and Drug Administration, HHS. ACTION: Notice of... District Office (DALDO), in collaboration with Oklahoma State University (OSU), Robert M. Kerr Food...

  10. 75 FR 29775 - Food Labeling Workshop; Public Workshop

    Science.gov (United States)

    2010-05-27

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES [Docket No. FDA-2010-N-0001] Food and Drug Administration Food Labeling Workshop; Public Workshop AGENCY: Food and Drug Administration, HHS. ACTION: Notice of...: Institute of Food Science & Engineering, University of Arkansas, 2650 North Young Ave., Fayetteville, AR...

  11. Development and validation of a strategic repositioning model for defense and aerospace contractors

    Science.gov (United States)

    Bers, John A.

    Strategic repositioning refers to the organized efforts of defense contractors to "reposition" a technology that they have developed for a defense sector customer into a civilian or commercial market. The strategic repositioning model developed here is a structural model: it seeks to isolate the factors that influence choice of strategy, which in turn influences the organization's performance. The model draws from the prior experience of contractors (through interviews and surveys) and companies in other sectors (through a review of the relevant published research). (1) Over all, the model accounted for 55% of the variance in financial performance of the sample and 35% for the underlying population. (2) Key success factors include a rigorous planning process, a target market in the growth (vs. incubation) stage, a priority on market leadership as well as financial return, the ability to operate in an ambiguous business environment, and a relatively short time horizon but strong corporate support. (3) The greatest challenges that a contractor is likely to encounter are understanding his new customers' buying practices, strong competition, and adapting his technology to their needs and price expectations. (4) To address these issues contractors often involve partners in their entry strategy, but partnerships of equals tend to be more difficult to bring off than direct entry strategies. (5) The two major target market categories--government and commercial--present different challenges. Commercial customers are more likely to resist doing business with the contractor, while contractors entering government and other noncommercial markets are more likely to encounter price resistance, low technical sophistication among customers, and difficulties reaching their customer base. (6) Despite these differences across markets, performance is not influenced by the target market category, nor by the type of product or service or the contractor's functional orientation (marketing

  12. Synthesis and characterization of (18)F-labeled active site inhibited factor VII (ASIS).

    Science.gov (United States)

    Erlandsson, Maria; Nielsen, Carsten H; Jeppesen, Troels E; Kristensen, Jesper B; Petersen, Lars C; Madsen, Jacob; Kjaer, Andreas

    2015-05-15

    Activated factor VII blocked in the active site with Phe-Phe-Arg-chloromethyl ketone (active site inhibited factor VII (ASIS)) is a 50-kDa protein that binds with high affinity to its receptor, tissue factor (TF). TF is a transmembrane glycoprotein that plays an important role in, for example, thrombosis, metastasis, tumor growth, and tumor angiogenesis. The aim of this study was to develop an (18)F-labeled ASIS derivative to assess TF expression in tumors. Active site inhibited factor VII was labeled using N-succinimidyl-4-[(18)F]fluorobenzoate, and the [(18)F]ASIS was purified on a PD-10 desalting column. The radiochemical yield was 25 ± 6%, the radiochemical purity was >97%, and the pseudospecific radioactivity was 35 ± 9 GBq/µmol. The binding efficacy was evaluated in pull-down experiments, which monitored the binding of unlabeled ASIS and [(18)F]ASIS to TF and to a specific anti-factor VII antibody (F1A2-mAb). No significant difference in binding efficacy between [(18)F]ASIS and ASIS could be detected. Furthermore, [(18)F]ASIS was relatively stable in vitro and in vivo in mice. In conclusion, [(18)F]ASIS has for the first time been successfully synthesized as a possible positron emission tomography tracer to image TF expression levels. In vivo positron emission tomography studies to evaluate the full potential of [(18)F]ASIS are in progress. Copyright © 2015 John Wiley & Sons, Ltd.

  13. Viis raamatutäit poola näidendeid / Riina Mägi

    Index Scriptorium Estoniae

    Mägi, Riina, 1957-

    2006-01-01

    Tõlkija Hendrik Lindepuult ilmus viies tõlkekogumik poola dramaturgia tippteoseid tutvustavast sarjast. Seekord said kaante vahele Tadeusz Rozewiczi näidendid "Valge abielu", "Lõks" ja "Vana naine haub"

  14. Systems Engineering Workshops | Wind | NREL

    Science.gov (United States)

    Workshops Systems Engineering Workshops The Wind Energy Systems Engineering Workshop is a biennial topics relevant to systems engineering and the wind industry. The presentations and agendas are available for all of the Systems Engineering Workshops: The 1st NREL Wind Energy Systems Engineering Workshop

  15. Endf/B-VII.0 Based Library for Paragon - 313

    International Nuclear Information System (INIS)

    Huria, H.C.; Kucukboyaci, V.N.; Ouisloumen, M.

    2010-01-01

    A new 70-group library has been generated for the Westinghouse lattice physics code PARAGON using the ENDF/B-VII.0 nuclear data files. The new library retains the major features of the current library, including the number of energy groups and the reduction in the U-238 resonance integral. The upper bound for the up-scattering effects in the new library, however, has been moved to 4.0 eV from 2.1 eV for better MOX fuel predictions. The new library has been used to analyze standard benchmarks and also to compare the measured and predicted parameters for different types of Westinghouse and Combustion Engineering (CE) type operating reactor cores. Results indicate that the new library will not impact the reactivity, power distribution and the temperature coefficient predictions over a wide range of physics design parameters; however, will improve the MOX core predictions. In other words, the ENDF/B-VI.3 and ENDF/B-VII.0 produce similar results for reactor core calculations. (authors)

  16. Association of ACE and FACTOR VII gene variability with the risk of coronary heart disease in north Indian population.

    Science.gov (United States)

    Sobti, R C; Maithil, Nishi; Thakur, Hitender; Sharma, Yashpaul; Talwar, K K

    2010-08-01

    The angiotensin converting enzyme (ACE) is a key factor in the production of angiotensin II and in the degradation of bradykinin. Chronic exposure to high levels of circulating and tissue ACE predispose to vascular wall thickening and atherosclerosis. Factor VII (FACTOR VII) is the first enzyme in the extrinsic pathway of the blood coagulation system and plays a key role in hemostasis; it also contributes to the occurrence of thrombotic events. In this study, we have examined the association of ACE and FACTOR VII gene in coronary heart disease patients (n = 300) and their age-matched controls (n = 300). Genotyping was done by PCR-RFLP method. No significant difference was observed in the distribution of I/D genotypes of ACE between cases and controls. In case of FACTOR VII R353Q polymorphism, there was not much difference in the distribution of alleles. AA genotype had protective effect for CHD (OR 0.56, 95% CI 0.37-0.83, P = 0.001). In case of FACTOR VII VNTR, there was difference in the distribution of alleles, H6 (73.5) and H7 (25.5) in cases, and H6 (70.5) and H7 (30.5) in controls. H6H7 and H7H7 genotypes had a protective effect for CHD with OR 0.27, 95% CI 0.18-0.41, P FACTOR VII R353Q and H6H7 and H7H7 genotypes of FACTOR VII VNTR showed protective effect for CHD.

  17. 47 CFR 22.879 - Interference resolution procedures.

    Science.gov (United States)

    2010-10-01

    ...) Changing commercial aviation air-ground system frequencies; and (vii) Supplying interference-resistant... belief after due diligence; (iv) Is not proffered by a contractor or other third party; and, (v) Has been...

  18. 76 FR 13423 - Notice of Submission of Proposed Information Collection to OMB; Contractor's Requisition-Project...

    Science.gov (United States)

    2011-03-11

    ... Proposed Information Collection to OMB; Contractor's Requisition--Project Mortgages AGENCY: Office of the.... Contractor's monthly application for distribution of insured mortgage proceeds for construction costs... Following Information Title of Proposal: Contractor's Requisition--Project Mortgages. OMB Approval Number...

  19. Private security and military contractors: A troubling oversight

    DEFF Research Database (Denmark)

    Swed, Ori; Crosbie, Thomas Alexander

    2017-01-01

    Though private military and security companies (PMSCs) have been addressed extensively in the literature, little research has been done on the contractors themselves, leaving us in the dark as to who these individuals are. In this article, we focus on the critical case of the United States armed...... and concomitant evolution of the security sector, while noting a new trend that points to the need for moving from the macrosocial to the microsocial level of inquiry. Second, we indicate the challenges contractors pose to the sociological paradigm of military professionalism: These suggest a need to move from...

  20. Contractor Past Performance - Are We There Yet?

    National Research Council Canada - National Science Library

    Guerrero, Juan

    2001-01-01

    During the United States federal government acquisition reform movement of the 1990s, the government strongly emphasized the use of past performance information to select contractors in federal procurements...

  1. DOE contractor's meeting on chemical toxicity

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    The Office of Health and Environmental Research (OHER) is required to determine the potential health and environmental effects associated with energy production and use. To ensure appropriate communication among investigators and scientific disciplines that these research studies represent, OHER has sponsored workshops. This document provides a compilation of activities at the Third Annual DOE/OHER Workshop. This year's workshop was broadened to include all OHER activities identified as within the chemical effects area. The workshop consisted of eight sessions entitled Isolation and Detection of Toxic chemicals; Adduct Formation and Repair; Chemical Toxicity (Posters); Metabolism and Genotoxicity; Inhalation Toxicology; Gene Regulation; Metals Toxicity; and Biological Mechanisms. This document contains abstracts of the information presented by session.

  2. VII International scientific conference Radiation-thermal effects and processes in inorganic materials. Proceedings

    International Nuclear Information System (INIS)

    2010-01-01

    In the collection there are the reports of the VII International scientific conference and the VII All-Russian school-conference Radiation-thermal effects and processes in inorganic materials which were conducted on October 2-10, 2010, in Tomsk. The reports deal with new developments of charged particles high-intensity beam sources, high-temperature metrology of high-current beams and work materials, radiation-thermal stimulated effects and processes in inorganic materials, physical basics of technological processes, radiation-thermal technologies and equipment for their realization, allied branches of science and technology, specifically, nanotechnologies [ru

  3. 78 FR 64499 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Use of Interagency Fleet...

    Science.gov (United States)

    2013-10-29

    ...; Submission for OMB Review; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department... previously approved information collection requirement concerning contractor use of interagency fleet... comments identified by Information Collection 9000- 0032, Contractor Use of Interagency Fleet Management...

  4. Improving UK client-contractor relations

    International Nuclear Information System (INIS)

    Brant, A.W.

    1996-01-01

    The client's aim in any decommissioning project is that the originally intended end point is achieved, within budget and on time. The contractor's aim is to have a satisfied client, so that both are happy to work together again, and to have a reasonable return for his efforts. How can these - not incompatible - aims best be achieved? (UK)

  5. Pengaruh Penerapan Pembelajaran Arias Dipadu Mind Map terhadap Hasil Belajar Kognitif Siswa Kelas VII

    OpenAIRE

    Leliavia, Leliavia; Al Muhdhar, Mimien Henie Irawati; Suwono, Hadi

    2017-01-01

    This research was to determine the effect of differences ARIAS combined mind map learning and ARIAS learning to cognitive learning outcomes grade VII SMPN 1 Tempunak. This research with quasy research experiment design approach with the design of pretest-posttest. Data were analyzed using descriptive statistics and inferensial to test the hypothesis that analysis of covariance (ANCOVA) using SPSS 23 for windows with a significance level of 0,05. The study was conducted at the grade VII SMPN 1...

  6. Applied antineutrino physics workshop

    International Nuclear Information System (INIS)

    Lund, James C.

    2008-01-01

    This workshop is the fourth one of a series that includes the Neutrino Geophysics Conference at Honolulu, Hawaii, which I attended in 2005. This workshop was organized by the Astro-Particle and Cosmology laboratory in the recently opened Condoret building of the University of Paris. More information, including copies of the presentations, on the workshop is available on the website: www.apc.univ-paris7.fr/AAP2007/. The workshop aims at opening neutrino physics to various fields such that it can be applied in geosciences, nuclear industry (reactor and spent fuel monitoring) and non-proliferation. The workshop was attended by over 60 people from Europe, USA, Asia and Brazil. The meeting was also attended by representatives of the Comprehensive nuclear-Test Ban Treaty (CTBT) and the International Atomic Energy Agency (IAEA). The workshop also included a workshop dinner on board of a river boat sailing the Seine river

  7. Modulated crystal structures of VII and V phases in (NH4)3H(SO4)2. I. Neutron Laue diffraction

    International Nuclear Information System (INIS)

    McIntyre, G.; Smirnov, L.S.; Baranov, A.I.; Dolbinina, V.V.; Frontas'eva, M.V.; Pavlov, S.S.; Pankratova, Yu.S.

    2010-01-01

    The study of crystal structures of VII and V phases of (NH 4 ) 3 H(SO 4 ) 2 by means of neutron Laue diffraction is carried out at temperatures from 5 to 300 K. It is found that crystal structures of VII and V phases have incommensurate modulation with different periods, and phase transition from phase VII to phase V is transition of the first type

  8. Lack of bleeding in patients with severe factor VII deficiency.

    Science.gov (United States)

    Barnett, J Mark; Demel, Kurt C; Mega, Anthony E; Butera, James N; Sweeney, Joseph D

    2005-02-01

    Factor VII deficiency, although rare, is now recognized as the most common autosomal recessive inherited factor deficiency. It is usually considered to be associated with bleeding only in the severely affected subject and heterozygotes (>10%) are not considered at risk. The general recommendation for surgery is to achieve a FVII level in excess of 15% (0.15 1U/mL). We present three cases of severe factor VII deficiency, each of whom appeared hemostatically competent based on clinical history. Subject 1 is a 33 year-old African-American female with a baseline FVII of American female with a factor VII level of 9% who underwent an elective left total hip replacement without any factor replacement and had no excessive bleeding, but who sustained a pulmonary embolism postoperatively. Subject 3 is a 19-year-old African-American male with a baseline FVII of 1% with a history of active participation in football without noticeable injury and who underwent an emergent appendectomy without bleeding. These three cases represent individuals with the severe form of FVII deficiency who did not exhibit excessive bleeding when challenged with surgical procedures. The clinical history would appear the most valuable tool in predicting the likelihood of bleeding in these patients, and we suggest that the presumption that all patients with severe FVII deficiency should receive replacement therapy before surgical procedures may not be valid in all cases. Copyright 2005 Wiley-Liss, Inc.

  9. 75 FR 10267 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Use of Interagency Motor...

    Science.gov (United States)

    2010-03-05

    ... ADMINISTRATION [OMB Control No. 9000-0032] Federal Acquisition Regulation; Submission for OMB Review; Contractor... previously approved information collection requirement concerning contractor use of interagency motor pool... contracting officer may authorize cost-reimbursement contractors to obtain, for official purposes only...

  10. 77 FR 63835 - Office of the Chief Information Officer; Submission for OMB Review; Temporary Contractor...

    Science.gov (United States)

    2012-10-17

    ... of the Chief Information Officer; Submission for OMB Review; Temporary Contractor Information... information collection requirement regarding temporary contractor information worksheet. A notice was... for temporary contractors as a result of the American Recovery and Reinvestment Act of 2009 (Public...

  11. Incoherent inelastic neutron scattering measurements on ice VII: Are there two kinds of hydrogen bonds in ice?

    International Nuclear Information System (INIS)

    Klotz, S.; Strassle, Th.; Philippe, J.; Salzmann, C.G.; Parker, S.F.

    2005-01-01

    We report the vibrational spectrum of recovered ice VII measured by inelastic incoherent neutron scattering and compare this to similar data of its fully hydrogen-ordered form, ice VIII, under exactly the same conditions (15 K, 1 bar). The spectra of the two phases have their principal features at similar energies, in both the translational and vibrational bands, with a substantial disorder-related broadening in ice VII. In particular, we find no evidence for a peak at 49 meV in ice VII which earlier was associated with the possible existence of two kinds of hydrogen bonds. Additional Raman measurements in ice VII and ice VIII show that the O-H stretching frequencies in the two phases are almost identical. Therefore, the presence of split molecular-optic bands in ice phases, including ordinary ice Ih, is likely related to an incomplete description of the phonon dispersion rather than to a fundamentally new feature in the nature of the hydrogen bond. (authors)

  12. institutional and resource constraints that inhibit contractor ...

    African Journals Online (AJOL)

    p2333147

    Keywords: Institutions; small-scale contractor performance; sugar industry. ABSTRACT ..... diverse cultural settings, women, specifically widowed or single women, have a .... constraints on business growth, such as the work limitations placed.

  13. CONTRACTORS OF SOCIALIZATION AND THEIR INFLUENCE ON SOCIAL PROCESSES

    OpenAIRE

    Mikhail Yu. POPOV

    2016-01-01

    This article is devoted to the analysis of an essence of the concept "contractors of socialization" and attempt of definition of its place in structure of sociological knowledge. During the solution of this task the author seeks to define destructive nature of influence of contractors of socialization on formation of the personality both at a stage of primary socialization, and in the course of the entire period of its activity. Inclusion of this term in structure of sociological knowledge, a...

  14. 78 FR 13547 - Defense Federal Acquisition Regulation Supplement: Alleged Crimes By or Against Contractor Personnel

    Science.gov (United States)

    2013-02-28

    ... Contractor Personnel AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION... (FY) 2009 and expand coverage on contractor requirements and responsibilities relating to alleged crimes by or against contractor personnel. DATES: Effective February 28, 2013. FOR FURTHER INFORMATION...

  15. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1990-10-01

    A fundamental premise of the Nuclear Regulatory Commission's (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The total government-industry system for the inspection of commercial nuclear facilities has been designed to provide for multiple levels of inspection and verification. Licensees, contractors, and vendors each participate in a quality verification process in compliance with requirements prescribed by the NRC's rules and regulations (Title 10 Code of Federal Regulations). The NRC performs an overview of the commercial nuclear industry by inspection to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of ongoing quality verification programs

  16. 78 FR 6189 - Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor Excise...

    Science.gov (United States)

    2013-01-29

    ... 9000-AM13 Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor... contractor in order to reimburse the tax imposed (26 U.S.C. 5000C Note). On February 22, 2012, DoD, GSA, and... with the statute, FAR 31.205-41 is amended to inform the Government and contractors that the costs of...

  17. Quantitative analysis of the synthesis and secretion of type VII collagen in cultured human dermal fibroblasts with a sensitive sandwich enzyme-linked immunoassay.

    Science.gov (United States)

    Amano, Satoshi; Ogura, Yuki; Akutsu, Nobuko; Nishiyama, Toshio

    2007-02-01

    Type VII collagen is the major component of anchoring fibrils in the epidermal basement membrane. Its expression has been analyzed by immunostaining or Northern blotting, but rarely at the protein level. In this study, we have quantitatively examined the effects of ascorbic acid and various cytokines/growth factors on the protein synthesis and secretion of type VII collagen by human dermal fibroblasts in culture, using a developed, highly sensitive sandwich enzyme-linked immunoassay with two kinds of specific monoclonal antibodies against the non-collagenous domain-1. Ascorbic acid and its derivative induced a twofold increase in type VII collagen synthesis, and markedly increased the secretion of type VII collagen into the medium when compared with the control culture. This effect was not influenced by the presence of transforming growth factor-beta1 (TGF-beta1). The synthesis of type VII collagen was elevated by TGF-beta1, platelet-derived growth factor, tumor necrosis factor-alpha, and interleukin-1beta, but not by TGF-alpha. Thus, our data indicate that the synthesis and secretion of type VII collagen in human dermal fibroblasts are regulated by ascorbate and the enhancement of type VII collagen gene expression by cytokines/growth factors is accompanied with elevated production of type VII collagen at the protein level.

  18. International Markets: Malaysian Construction Contractors and the Stage Theory

    Directory of Open Access Journals (Sweden)

    Ahmed Awil

    2012-11-01

    Full Text Available Reduced demand for services, lack of finances for projects and idle resources at homehave resulted in loss of business for Malaysian construction contractors. Among the optionsthat are explored in this paper is internationalisation of services to help the contractorsgainfully employ their resources and diversify their markets. Integration of worldmarkets, faster transportation and improved means of communication have made it possiblefor contractors to undertake work in international markets. It was found that contractorswere motivated to internationalise by need to make the firm a viable one byconsidering the long-term profitability. Reputation and size of the firm were found to befactors that help contractors in winning contracts overseas. Most non-exporters were concernedwith provision of market intelligence and export credit finance. It was found thatproviding relevant market information, accessible to both exporter and non-exporters, canhelp firms make informed decisions. Any assistance provided should match the firm to thestage the firm has reached in exporting

  19. Government/contractor partnerships for continuous improvement. A Goddard Space Flight Center example

    Science.gov (United States)

    Tagler, Richard C.

    1992-01-01

    The efforts of a government organization and its major contractors to foster a continuous improvement environment which transcends the traditional government/contractor relationship is discussed. This relationship is aimed at communication, partnership, and trust - creating benefits for all involved.

  20. 77 FR 20051 - Notice of Final Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2012-04-03

    ... Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor Pursuant to... ``Procedural Guidelines for the Maintenance of the List of Products Requiring Federal Contractor Certification... List of Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor...