WorldWideScience

Sample records for contractor-grantee workshop iv

  1. DOE Human Genome Program contractor-grantee workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    This volume contains the proceedings for the DOE Human Genome Program`s Contractor-Grantee Workshop V held in Sante Fe, New Mexico January 28, February 1, 1996. Presentations were divided into sessions entitled Sequencing; Mapping; Informatics; Ethical, Legal, and Social Issues; and Infrastructure. Reports of individual projects described herein are separately indexed and abstracted for the database.

  2. DOE Human Genome Program: Contractor-Grantee Workshop IV, November 13--17, 1994, Santa Fe, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This volume contains the proceedings of the fourth Contractor-Grantee Workshop for the Department of Energy (DOE) Human Genome Program. Of the 204 abstracts in this book, some 200 describe the genome research of DOE-funded grantees and contractors located at the multidisciplinary centers at Lawrence Berkeley Laboratory, Lawrence Livermore National Laboratory, and Los Alamos National Laboratory; other DOE-supported laboratories; and more than 54 universities, research organizations, and companies in the United States and abroad. Included are 16 abstracts from ongoing projects in the Ethical, Legal, and Social Issues (ELSI) component, an area that continues to attract considerable attention from a wide variety of interested parties. Three abstracts summarize work in the new Microbial Genome Initiative launched this year by the Office of Health and Environmental Research (OHER) to provide genome sequence and mapping data on industrially important microorganisms and those that live under extreme conditions. Many of the projects will be discussed at plenary sessions held throughout the workshop, and all are represented in the poster sessions.

  3. Genomics:GTL Contractor-Grantee Workshop IV and Metabolic Engineering Working Group Inter-Agency Conference on Metabolic Engineering 2006

    Energy Technology Data Exchange (ETDEWEB)

    Mansfield, Betty Kay [ORNL; Martin, Sheryl A [ORNL

    2006-02-01

    Welcome to the 2006 joint meeting of the fourth Genomics:GTL Contractor-Grantee Workshop and the six Metabolic Engineering Working Group Inter-Agency Conference. The vision and scope of the Genomics:GTL program continue to expand and encompass research and technology issues from diverse scientific disciplines, attracting broad interest and support from researchers at universities, DOE national laboratories, and industry. Metabolic engineering's vision is the targeted and purposeful alteration of metabolic pathways to improve the understanding and use of cellular pathways for chemical transformation, energy transduction, and supramolecular assembly. These two programs have much complementarity in both vision and technological approaches, as reflected in this joint workshop. GLT's challenge to the scientific community remains the further development and use of a broad array of innovative technologies and computational tools to systematically leverage the knowledge and capabilities brought to us by DNA sequencing projects. The goal is to seek a broad and predictive understanding of the functioning and control of complex systems--individual microbes, microbial communities, and plants. GTL's prominent position at the interface of the physical, computational, and biological sciences is both a strength and challenge. Microbes remain GTL's principal biological focus. In the complex 'simplicity' of microbes, they find capabilities needed by DOE and the nation for clean and secure energy, cleanup of environmental contamination, and sequestration of atmospheric carbon dioxide that contributes to global warming. An ongoing challenge for the entire GTL community is to demonstrate that the fundamental science conducted in each of your research projects brings us a step closer to biology-based solutions for these important national energy and environmental needs.

  4. DOE contractors' workshop: Cellular and molecular aspects of radiation induced DNA damage and repair

    International Nuclear Information System (INIS)

    1987-01-01

    For four decades the US Department of Energy and its predecessors have been the lead federal agency in supporting radiation biology research. Over the years emphasis in this program has gradually shifted from dose-effect studies on animals to research on the effects of radiations of various qualities on cells and molecules. Mechanistic studies on the action of radiation at the subcellular level are few in number and there is a need for more research in this area if we are to gain a better understanding of how radiation affects living cells. The intent of this workshop was to bring together DOE contractors and grantees who are investigating the effects of radiation at the cellular and molecular levels. The aims were to foster the exchange of information on research projects and experimental results, promote collaborative research efforts, and obtain an overview of research currently supported by the Health Effects Research Division of the Office of Health and Environmental Research. The latter is needed by the Office for program planning purposes. This report on the workshop which took place in Albuquerque, New Mexico on March 10-11, 1987, includes an overview with future research recommendations, extended abstracts of the plenary presentations, shorter abstracts of each poster presentation, a workshop agenda and the names and addresses of the attendees

  5. DOE contractors' workshop: Cellular and molecular aspects of radiation induced DNA damage and repair

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    For four decades the US Department of Energy and its predecessors have been the lead federal agency in supporting radiation biology research. Over the years emphasis in this program has gradually shifted from dose-effect studies on animals to research on the effects of radiations of various qualities on cells and molecules. Mechanistic studies on the action of radiation at the subcellular level are few in number and there is a need for more research in this area if we are to gain a better understanding of how radiation affects living cells. The intent of this workshop was to bring together DOE contractors and grantees who are investigating the effects of radiation at the cellular and molecular levels. The aims were to foster the exchange of information on research projects and experimental results, promote collaborative research efforts, and obtain an overview of research currently supported by the Health Effects Research Division of the Office of Health and Environmental Research. The latter is needed by the Office for program planning purposes. This report on the workshop which took place in Albuquerque, New Mexico on March 10-11, 1987, includes an overview with future research recommendations, extended abstracts of the plenary presentations, shorter abstracts of each poster presentation, a workshop agenda and the names and addresses of the attendees.

  6. OES-IA Annex IV: Environmental Effects of Marine and Hydrokinetic Devices - Report from the Experts(trademark) Workshop September 27th-28th 2010 Clontarf Castle, Dublin Ireland

    International Nuclear Information System (INIS)

    Copping, Andrea E.; O'Toole, Michael J.

    2010-01-01

    An experts workshop was convened in Dublin Ireland September 27th-28th 2010 in support of IEA Ocean Energy Systems Implementing Agreement Annex IV. PNNL was responsible for organizing the content of the workshop, overseeing the contractors (Irish Marine Institute) hosting the event, presenting material on Annex IV and materials applicable to the workshop intent. PNNL is also overseeing a contractor (Wave Energy Center/University of Plymouth - WEC/UP) in the collection and analysis of the Annex IV data. Fifty-eight experts from 8 countries attended the workshop by invitation, spending two days discussing the needs of Annex IV. Presentations by DOE (background on Annex IV), PNNL (process for developing Annex IV; presentation of the draft database for PNNL project, plans for incorporating Annex IV data), WEC/UP on the environmental effect matrix, and four MHK developers (two from the UK, one from Ireland and one from Sweden; each discussing their own projects and lessons learned for measuring and mitigating environmental effects, as well as interactions with consenting (permitting) processes) helped provide background. The workshop participants worked part of the time in the large group and most of the time in four smaller breakout groups. Participants engaged in the process and provided a wealth of examples of MHK environmental work, particularly in the European nations. They provided practical and actionable advice on the following: (1) Developing the Annex IV database, with specific uses and audiences; (2) Strong consensus that we should collect detailed metadata on available data sets, rather than attempting to draw in copious datasets. The participants felt there would then be an opportunity to then ask for specific set of data as needed, with specific uses and ownership of the data specified. This is particularly important as many data collected, particularly in Europe but also in Canada, are proprietary; developers were not comfortable with the idea of handing

  7. 76 FR 62373 - Notice of Public Meeting-Cloud Computing Forum & Workshop IV

    Science.gov (United States)

    2011-10-07

    ...--Cloud Computing Forum & Workshop IV AGENCY: National Institute of Standards and Technology (NIST), Commerce. ACTION: Notice. SUMMARY: NIST announces the Cloud Computing Forum & Workshop IV to be held on... to help develop open standards in interoperability, portability and security in cloud computing. This...

  8. OES-IA Annex IV: Environmental Effects of Marine and Hydrokinetic Devices - Report from the Experts’ Workshop September 27th – 28th 2010 Clontarf Castle, Dublin Ireland

    Energy Technology Data Exchange (ETDEWEB)

    Copping, Andrea E.; O' Toole, Michael J.

    2010-12-02

    An experts' workshop was convened in Dublin Ireland September 27th – 28th 2010 in support of IEA Ocean Energy Systems Implementing Agreement Annex IV. PNNL was responsible for organizing the content of the workshop, overseeing the contractors (Irish Marine Institute) hosting the event, presenting material on Annex IV and materials applicable to the workshop intent. PNNL is also overseeing a contractor (Wave Energy Center/University of Plymouth – WEC/UP) in the collection and analysis of the Annex IV data. Fifty-eight experts from 8 countries attended the workshop by invitation, spending two days discussing the needs of Annex IV. Presentations by DOE (background on Annex IV), PNNL (process for developing Annex IV; presentation of the draft database for PNNL project, plans for incorporating Annex IV data), WEC/UP on the environmental effect matrix, and four MHK developers (two from the UK, one from Ireland and one from Sweden; each discussing their own projects and lessons learned for measuring and mitigating environmental effects, as well as interactions with consenting [permitting] processes) helped provide background. The workshop participants worked part of the time in the large group and most of the time in four smaller breakout groups. Participants engaged in the process and provided a wealth of examples of MHK environmental work, particularly in the European nations. They provided practical and actionable advice on the following: • Developing the Annex IV database, with specific uses and audiences • Strong consensus that we should collect detailed metadata on available data sets, rather than attempting to draw in copious datasets. The participants felt there would then be an opportunity to then ask for specific set of data as needed, with specific uses and ownership of the data specified. This is particularly important as many data collected, particularly in Europe but also in Canada, are proprietary; developers were not comfortable with the idea

  9. Proceedings of the Federal Transit Administration's Urban Maglev Workshop

    Science.gov (United States)

    2005-09-01

    The Federal Transit Administrations (FTA) Urban Maglev Workshop was held at FTA Headquarters in Washington, DC, on September 8-9, 2005. The key workshop goals were to review progress, share lessons learned among the grantees, and discuss future di...

  10. Brownfields Assessing Contractor Capabilities for Streamlined Site Investigation: Additional Information Regarding All Appropriate Inquiries and Hiring an Environmental Professional

    Science.gov (United States)

    This document assists Brownfields grantees and other decision makers as they assess the capabilities of contractors and consultants to determine their qualifications to provide streamlined and innovative strategies for the assessment and and cleanup.

  11. IGORR-IV workshop on R and D needs

    International Nuclear Information System (INIS)

    Boening, Klaus

    1995-01-01

    The IGORR-IV Workshop on R and D Needs, which is the subject of this summarizing paper, provided the opportunity for the participants to report on new R and D needs they have as well as on R and D work which was going on at their home institutions ad which could be of interest to other groups. Numerous topics of interest are: Accident and safety analysis codes and benchmarks; thermophysical properties of D 2 O liquid and vapor; chemical and other energy release from core melt event; Fission product release from a molten MTR core; Thermal conductivity of irradiated fuel; tests of cryogenic circulators for single-phase forced-convection cold source; Flow blockage tests

  12. Brownfields Assessing Contractor Capabilities for Streamlined Site Investigations -- Additional Information Regarding All Appropriate Inquiries and Hiring an Environmental Professional (November 2006)

    Science.gov (United States)

    Guidance for Brownfields grantees and other decision makers to assess the capabilities of contractors and consultants to determine their qualifications to provide streamlined and innovative strategies for the assessment and cleanup of brownfields.

  13. Proceedings of the Department of Energy ALARA Workshop

    International Nuclear Information System (INIS)

    Dionne, B.J.; Baum, J.W.

    1992-01-01

    The report contains summaries of papers, discussions, and operational exercises presented at the first Department of Energy ALARA Workshop held at Brookhaven National Laboratory, Upton, New York on April 21--22, 1992. The purpose of this workshop was to provide a forum for, and enhance communication among, ALARA personnel, as well as to inform DOE's field office and contractor personnel about the Office of Health's programs and expectations from the entire DOE complex efforts in the ALARA area.The two-day workshop consisted of one day dedicated to presentations on implementing various elements of a formal ALARA program at the DOE contractors' facilities, regulatory aspects of ALARA programs, and DOE Headquarters' ALARA expectations/initiatives. The second day was devoted to detailed discussions on ALARA improvements and problems, and operational exercises on cost-benefit analyses and on ALARA job/experiment reviews. At this workshop, 70 health physicists and radiation safety engineers from 5 DOE Headquarter Offices, 7 DOE operations/area offices, and 27 contractor facilities exchanged information, which is expected to stimulate further improvement in the DOE contractors' ALARA programs. Individual papers are indexed separately

  14. Proceedings of the Department of Energy ALARA Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Dionne, B.J.; Baum, J.W. [comps.

    1992-12-31

    The report contains summaries of papers, discussions, and operational exercises presented at the first Department of Energy ALARA Workshop held at Brookhaven National Laboratory, Upton, New York on April 21--22, 1992. The purpose of this workshop was to provide a forum for, and enhance communication among, ALARA personnel, as well as to inform DOE`s field office and contractor personnel about the Office of Health`s programs and expectations from the entire DOE complex efforts in the ALARA area.The two-day workshop consisted of one day dedicated to presentations on implementing various elements of a formal ALARA program at the DOE contractors` facilities, regulatory aspects of ALARA programs, and DOE Headquarters` ALARA expectations/initiatives. The second day was devoted to detailed discussions on ALARA improvements and problems, and operational exercises on cost-benefit analyses and on ALARA job/experiment reviews. At this workshop, 70 health physicists and radiation safety engineers from 5 DOE Headquarter Offices, 7 DOE operations/area offices, and 27 contractor facilities exchanged information, which is expected to stimulate further improvement in the DOE contractors` ALARA programs. Individual papers are indexed separately.

  15. Proceedings of the Department of Energy ALARA Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Dionne, B.J.; Baum, J.W. (comps.)

    1992-01-01

    The report contains summaries of papers, discussions, and operational exercises presented at the first Department of Energy ALARA Workshop held at Brookhaven National Laboratory, Upton, New York on April 21--22, 1992. The purpose of this workshop was to provide a forum for, and enhance communication among, ALARA personnel, as well as to inform DOE's field office and contractor personnel about the Office of Health's programs and expectations from the entire DOE complex efforts in the ALARA area.The two-day workshop consisted of one day dedicated to presentations on implementing various elements of a formal ALARA program at the DOE contractors' facilities, regulatory aspects of ALARA programs, and DOE Headquarters' ALARA expectations/initiatives. The second day was devoted to detailed discussions on ALARA improvements and problems, and operational exercises on cost-benefit analyses and on ALARA job/experiment reviews. At this workshop, 70 health physicists and radiation safety engineers from 5 DOE Headquarter Offices, 7 DOE operations/area offices, and 27 contractor facilities exchanged information, which is expected to stimulate further improvement in the DOE contractors' ALARA programs. Individual papers are indexed separately.

  16. Advanced Computational Materials Science: Application to Fusion and Generation IV Fission Reactors (Workshop Report)

    Energy Technology Data Exchange (ETDEWEB)

    Stoller, RE

    2004-07-15

    The ''Workshop on Advanced Computational Materials Science: Application to Fusion and Generation IV Fission Reactors'' was convened to determine the degree to which an increased effort in modeling and simulation could help bridge the gap between the data that is needed to support the implementation of these advanced nuclear technologies and the data that can be obtained in available experimental facilities. The need to develop materials capable of performing in the severe operating environments expected in fusion and fission (Generation IV) reactors represents a significant challenge in materials science. There is a range of potential Gen-IV fission reactor design concepts and each concept has its own unique demands. Improved economic performance is a major goal of the Gen-IV designs. As a result, most designs call for significantly higher operating temperatures than the current generation of LWRs to obtain higher thermal efficiency. In many cases, the desired operating temperatures rule out the use of the structural alloys employed today. The very high operating temperature (up to 1000 C) associated with the NGNP is a prime example of an attractive new system that will require the development of new structural materials. Fusion power plants represent an even greater challenge to structural materials development and application. The operating temperatures, neutron exposure levels and thermo-mechanical stresses are comparable to or greater than those for proposed Gen-IV fission reactors. In addition, the transmutation products created in the structural materials by the high energy neutrons produced in the DT plasma can profoundly influence the microstructural evolution and mechanical behavior of these materials. Although the workshop addressed issues relevant to both Gen-IV and fusion reactor materials, much of the discussion focused on fusion; the same focus is reflected in this report. Most of the physical models and computational methods

  17. 45 CFR 1180.46 - Evaluation by the grantee.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Evaluation by the grantee. 1180.46 Section 1180.46... HUMANITIES INSTITUTE OF MUSEUM AND LIBRARY SERVICES GRANTS REGULATIONS General Conditions Which Must Be Met by a Grantee Evaluation § 1180.46 Evaluation by the grantee. A grantee shall evaluate at least semi...

  18. Human Genome Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-01

    The DOE Human Genome program has grown tremendously, as shown by the marked increase in the number of genome-funded projects since the last workshop held in 1991. The abstracts in this book describe the genome research of DOE-funded grantees and contractors and invited guests, and all projects are represented at the workshop by posters. The 3-day meeting includes plenary sessions on ethical, legal, and social issues pertaining to the availability of genetic data; sequencing techniques, informatics support; and chromosome and cDNA mapping and sequencing.

  19. Workshop on Language Student Attrition

    National Research Council Canada - National Science Library

    Whelan, Bree

    2001-01-01

    Seventy individuals from Government agencies (military and civilian), academia, and contractor organizations attended all or parts of a Workshop on student Attrition held at the Defense Language Institute Foreign Language Center (DLIFLC...

  20. The second international workshop on enterprise security

    OpenAIRE

    Chang, V; Ramachandran, M; Yen, NN; Walters, RJ; Wills, G

    2016-01-01

    Welcome to our second international workshop on Enterprise Security as part of CloudCom 2015, Vancouver, Canada, November 30-December 3, 2015. The first international workshop held in Singapore has been a major success since then we have achieved greater team activities, research, and international collaborations as the major and significant outcome of our first workshop on this topic. Enterprise Security involves all business, products, governments, organization, and their contractors. This ...

  1. 28 CFR 91.60 - Grantee's responsibilities.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Grantee's responsibilities. 91.60 Section 91.60 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) GRANTS FOR CORRECTIONAL FACILITIES...'s responsibilities. Specific duties. As part of its role in the NEPA process, the grantee agency...

  2. 42 CFR 59.212 - Grantee accountability.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Grantee accountability. 59.212 Section 59.212 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR FAMILY PLANNING SERVICES Grants for Family Planning Service Training § 59.212 Grantee accountability. (a...

  3. 42 CFR 56.113 - Grantee accountability.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Grantee accountability. 56.113 Section 56.113 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR MIGRANT HEALTH SERVICES General Provisions § 56.113 Grantee accountability. (a) Accounting for grant award...

  4. 42 CFR 124.8 - Grantee accountability.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Grantee accountability. 124.8 Section 124.8 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH RESOURCES DEVELOPMENT... and Modernization § 124.8 Grantee accountability. (a) Records requirements. (1) Applicants who have...

  5. 42 CFR 86.18 - Grantee accountability.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Grantee accountability. 86.18 Section 86.18 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OCCUPATIONAL SAFETY AND HEALTH... Occupational Safety and Health Training Grants § 86.18 Grantee accountability. (a) Accounting for grant award...

  6. 34 CFR 75.612 - Supervision and inspection by the grantee.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Supervision and inspection by the grantee. 75.612 Section 75.612 Education Office of the Secretary, Department of Education DIRECT GRANT PROGRAMS What Conditions Must Be Met by a Grantee? Construction § 75.612 Supervision and inspection by the grantee. A grantee shall maintain competent architectural...

  7. Industrial Waste Landfill IV upgrade package

    International Nuclear Information System (INIS)

    1994-01-01

    The Y-12 Plant, K-25 Site, and ORNL are managed by DOE's Operating Contractor (OC), Martin Marietta Energy Systems, Inc. (Energy Systems) for DOE. Operation associated with the facilities by the Operating Contractor and subcontractors, DOE contractors and the DOE Federal Building result in the generation of industrial solid wastes as well as construction/demolition wastes. Due to the waste streams mentioned, the Y-12 Industrial Waste Landfill IV (IWLF-IV) was developed for the disposal of solid industrial waste in accordance to Rule 1200-1-7, Regulations Governing Solid Waste Processing and Disposal in Tennessee. This revised operating document is a part of a request for modification to the existing Y-12 IWLF-IV to comply with revised regulation (Rule Chapters 1200-1-7-.01 through 1200-1-7-.08) in order to provide future disposal space for the ORR, Subcontractors, and the DOE Federal Building. This revised operating manual also reflects approved modifications that have been made over the years since the original landfill permit approval. The drawings referred to in this manual are included in Drawings section of the package. IWLF-IV is a Tennessee Department of Environmental and Conservation/Division of Solid Waste Management (TDEC/DSWM) Class 11 disposal unit

  8. Defense Primer: DOD Contractors

    Science.gov (United States)

    2017-02-10

    functions, from intelligence analysis or software development to landscaping or food service. Why does DOD use individual contractors? Going back to...that provide professional services, from research to management support. The bulk of contractors—more than 70%—provide products, and these include...10 U.S.C. Part IV: Service, Supply, and Procurement. CRS Products CRS In Focus IF10548, Defense Primer: U.S. Defense Industrial Base, by Daniel

  9. 75 FR 24571 - Designation of New Grantee

    Science.gov (United States)

    2010-05-05

    ... considered the application (filed 12/01/09) submitted by the Culpeper County Chamber of Commerce, grantee of... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [Order No. 1677] Designation of New Grantee... the Board's regulations, including Section 400.28. The Secretary of Commerce, as Chairman of the Board...

  10. 7 CFR 1944.419 - Final grantee evaluation.

    Science.gov (United States)

    2010-01-01

    ...) PROGRAM REGULATIONS (CONTINUED) HOUSING Self-Help Technical Assistance Grants § 1944.419 Final grantee...HA or its successor agency under Public Law 103-354 employees or an organization under contract to Fm... determine how successful the grantee was in meeting goals and objectives as defined in the agreement...

  11. 25 CFR 276.7 - Standards for grantee financial management systems.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Standards for grantee financial management systems. 276.7... grantee financial management systems. (a) Grantee financial management systems for grants and subgrantee financial management systems for subgrants shall provide for: (1) Accurate, current, and complete disclosure...

  12. 42 CFR 51c.112 - Grantee accountability.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Grantee accountability. 51c.112 Section 51c.112 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR COMMUNITY HEALTH SERVICES General Provisions § 51c.112 Grantee accountability. (a) Accounting for grant award...

  13. 45 CFR 1180.47 - Federal evaluation-Cooperation by a grantee.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Federal evaluation-Cooperation by a grantee. 1180... FOUNDATION ON THE ARTS AND THE HUMANITIES INSTITUTE OF MUSEUM AND LIBRARY SERVICES GRANTS REGULATIONS General Conditions Which Must Be Met by a Grantee Evaluation § 1180.47 Federal evaluation—Cooperation by a grantee. A...

  14. HUD Exchange Grantee Database

    Data.gov (United States)

    Department of Housing and Urban Development — The About Grantees section of the HUD Exchange brings up contact information, reports, award, jurisdiction, and location data for organizations that receive HUD...

  15. 1998 federal technical standards workshop: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-10-01

    The theme for the 1998 workshop was Standards Management -- A World of Change and Opportunities. The workshop`s goal was to further the implementation of the National Technology Transfer and Advancement Act of 1995 (Public Law 104-113) through the sharing of standards management success stories, lessons learned, and emerging initiatives within the Executive Branch of the Federal Government. The target audience for this workshop included agency/department and contractor personnel and representatives of standards developing organizations that either used technical standards in their work for the Federal Government of participated in standards writing/management activities in support of the missions and programs of Federal agencies/departments. As with previous standards workshops sponsored by the DOE, views on the technical subject areas under the workshop theme were solicited from and provided by agency Standards Executives and standards program managers, voluntary standards organizations, and the private sector. This report includes vugraphs of the presentations.

  16. DOE contractor trade network: a decade of experience in training resource exchange

    International Nuclear Information System (INIS)

    Croll, P.; Weseman, M.

    1989-01-01

    Training Resources and Data Exchange (TRADE) refers to a series of activities designed to increase communication and exchanges of ideas, information, and resources among US Department of Energy contractor operated facilities in the field of training and human resource development. TRADE activities are planned and implemented by the DOE Contractor TRADE Executive Committee. TRADE objectives are accomplished through conference workshops, publications, and special interest groups. TRADE special interest groups include the following: computer-based training, emergency preparedness, industrial hygiene training, human resource issues, radiation protection training, safeguards and security training. The authors discuss how TRADE has evolved to meet changing contractor needs to improve human performance over the last 10 years. TRADE currently has working agreements to share training information with INPO, the Federal Laboratories Consortium, and the National Registry of Radiation Protection Technologists

  17. 1993 Radiation Protection Workshop: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    The 1993 DOE Radiation Protection Workshop was conducted from April 13 through 15, 1993 in Las Vegas, Nevada. Over 400 Department of Energy Headquarters and Field personnel and contractors from the DOE radiological protection community attended the Workshop. Forty-nine papers were presented in eleven separate sessions: Radiological Control Manual Implementation, New Approaches to Instrumentation and Calibration, Radiological Training Programs and Initiatives, External Dosimetry, Internal Dosimetry, Radiation Exposure Reporting and Recordkeeping, Air Sampling and Monitoring Issues, Decontamination and Decommissioning of Sites, Contamination Monitoring and Control, ALARA/Radiological Engineering, and Current and Future Health Physics Research. Individual papers are indexed separately on the database.

  18. 1993 Radiation Protection Workshop: Proceedings

    International Nuclear Information System (INIS)

    1993-01-01

    The 1993 DOE Radiation Protection Workshop was conducted from April 13 through 15, 1993 in Las Vegas, Nevada. Over 400 Department of Energy Headquarters and Field personnel and contractors from the DOE radiological protection community attended the Workshop. Forty-nine papers were presented in eleven separate sessions: Radiological Control Manual Implementation, New Approaches to Instrumentation and Calibration, Radiological Training Programs and Initiatives, External Dosimetry, Internal Dosimetry, Radiation Exposure Reporting and Recordkeeping, Air Sampling and Monitoring Issues, Decontamination and Decommissioning of Sites, Contamination Monitoring and Control, ALARA/Radiological Engineering, and Current and Future Health Physics Research. Individual papers are indexed separately on the database

  19. 6th Workshop on waste management contracts

    International Nuclear Information System (INIS)

    2000-01-01

    The workshop was intended for participants from industry and the service sector and municipalities responsible in particular for the legal aspects involved in the waste management business, namely for concluding the contracts with customers and contractors and for contract management in compliance with the laws and regulations of Germany and the European Union, including the relevant pollution control and monitoring obligations. Participants of the workshop received in-depth information and guidance through discussion of contracts and document types of relevance in this context. (orig./CB) [de

  20. 20 CFR 668.710 - What planning documents must an INA grantee submit?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What planning documents must an INA grantee... Planning/Funding Process § 668.710 What planning documents must an INA grantee submit? Each grantee... participant services and expenditures covering the two-year planning cycle. We will, in consultation with the...

  1. Contractor evaluations in the contractor selection process.

    Science.gov (United States)

    2014-04-01

    The current contractor evaluation system in use within the Kentucky Transportation Cabinet is based on the contractor evaluation system developed as part of SPR 212-00 "Quality Based Prequalification of Contractors." This system relies on average per...

  2. 2005 NASA Seal/Secondary Air System Workshop, Volume 1

    Science.gov (United States)

    Steinetz, Bruce M. (Editor); Hendricks, Robert C. (Editor)

    2006-01-01

    The 2005 NASA Seal/Secondary Air System workshop covered the following topics: (i) Overview of NASA s new Exploration Initiative program aimed at exploring the Moon, Mars, and beyond; (ii) Overview of the NASA-sponsored Propulsion 21 Project; (iii) Overview of NASA Glenn s seal project aimed at developing advanced seals for NASA s turbomachinery, space, and reentry vehicle needs; (iv) Reviews of NASA prime contractor, vendor, and university advanced sealing concepts including tip clearance control, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. Turbine engine studies have shown that reducing high-pressure turbine (HPT) blade tip clearances will reduce fuel burn, lower emissions, retain exhaust gas temperature margin, and increase range. Several organizations presented development efforts aimed at developing faster clearance control systems and associated technology to meet future engine needs. The workshop also covered several programs NASA is funding to develop technologies for the Exploration Initiative and advanced reusable space vehicle technologies. NASA plans on developing an advanced docking and berthing system that would permit any vehicle to dock to any on-orbit station or vehicle. Seal technical challenges (including space environments, temperature variation, and seal-on-seal operation) as well as plans to develop the necessary "androgynous" seal technologies were reviewed. Researchers also reviewed tests completed for the shuttle main landing gear door seals.

  3. 36 CFR 64.12 - Standards for grantee financial management systems.

    Science.gov (United States)

    2010-07-01

    ... financial management systems. 64.12 Section 64.12 Parks, Forests, and Public Property NATIONAL PARK SERVICE... RIGHTS-OF-WAY § 64.12 Standards for grantee financial management systems. The grantees' Financial Management Systems shall meet the minimum standards set forth in OMB Circular A-102, Attachment G. ...

  4. 34 CFR 377.31 - What information must a grantee provide to eligible clients?

    Science.gov (United States)

    2010-07-01

    ... clients? 377.31 Section 377.31 Education Regulations of the Offices of the Department of Education... PROJECTS TO INCREASE CLIENT CHOICE PROGRAM What Post-Award Conditions Must Be Met by a Grantee? § 377.31 What information must a grantee provide to eligible clients? Each grantee shall advise all clients and...

  5. Report on World Workshops on Oral Medicine IV and V

    DEFF Research Database (Denmark)

    Peterson, DE; Lodi, Giovanni; Jensen, Siri Beier

    2014-01-01

    The first World Workshop on Oral Medicine (WWOM) was held in 1988. The portfolio has continued to expand in scope and impact over the past twenty-six years. Five World Workshops were conducted between 1988 and 2010, focusing on creation of systematic reviews in biomedicine and health care...

  6. Contractor safety

    International Nuclear Information System (INIS)

    Blanton, M.L.; Montgomery, E.W.

    1991-01-01

    The recent trend in the United States and Shell Oil Company EandP has been to increase use of contractors to do specialized work. Many companies now use contractors almost exclusively for operations such as drilling, well workovers, construction, and many specialty and routine maintenance tasks. Today, approximately 75% of Shell Oil Company's actual operating work force in EandP is contract. Clearly, HSandE considerations must become an increasingly important part of the contractor selection process. This paper reports on the Shell Oil Company's evolution from a bidder selection process to a program of Matching Owner and Contractor. Well has begun to expand efforts to make better assessments of contractor's HSandE capabilities and values in pre-bid considerations. Focus is on pre-bid evaluations to select contractors that have strong HSandE commitments and values. Contractor safety performance in this industry must be brought up to the same standards as operating companies. In Shell Oil EandP is only willing to contractors who can and are willing to do that

  7. Japanese contributions to IAEA INTOR workshop, phase two A, part 2, chapter IV: RF heating and current drive

    International Nuclear Information System (INIS)

    Sugihara, Masayoshi; Kimura, Haruyuki; Okazaki, Takashi

    1985-07-01

    This report corresponds to Chapter IV of Japanese contribution report to IAEA INTOR Workshop, phase Two A, Part 2. Data base assessments of plasma heating and launcher system design for Ion Cyclotron Range of Frequency (ICRF) wave, for Lower Hybrid Range of Frequency (LHRF) wave, and for Electron Cyclotron Range of Frequency (ECRF) wave are made. Assessments of current drive by LHRF, and of start-up assist and profile control by ECRF are also made. R and D programmes both physics and technology for each of the waves are specified. Applications of these waves to INTOR are examined. (author)

  8. 2007 NASA Seal/Secondary Air System Workshop. Volume 1

    Science.gov (United States)

    Steinetz, Bruce M.; Hendricks, Robert C.; Delgado, Irebert

    2008-01-01

    The 2007 NASA Seal/Secondary Air System workshop covered the following topics: (i) Overview of NASA's new Orion project aimed at developing a new spacecraft that will fare astronauts to the International Space Station, the Moon, Mars, and beyond; (ii) Overview of NASA's fundamental aeronautics technology project; (iii) Overview of NASA Glenn s seal project aimed at developing advanced seals for NASA's turbomachinery, space, and reentry vehicle needs; (iv) Reviews of NASA prime contractor, vendor, and university advanced sealing concepts, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. Turbine engine studies have shown that reducing seal leakage as well as high-pressure turbine (HPT) blade tip clearances will reduce fuel burn, lower emissions, retain exhaust gas temperature margin, and increase range. Turbine seal development topics covered include a method for fast-acting HPT blade tip clearance control, noncontacting low-leakage seals, intershaft seals, and a review of engine seal performance requirements for current and future Army engine platforms.

  9. Contractor management

    NARCIS (Netherlands)

    Ustailieva, E.; Starren, A.

    2013-01-01

    Companies function more and more in networks (i.e. contractor chains with contractors, suppliers and/or other companies. This asks for several companies/parties to work together to get the work done. Working in contractor chains is very common in sectors like maintenance, construction, cleaning, and

  10. 76 FR 13097 - Institute of Museum and Library Services; Evaluation by Grantees

    Science.gov (United States)

    2011-03-10

    ... With Institutions of Higher Education, Hospitals, and Other Non-Profit Organizations, provides, in part... Services; Evaluation by Grantees AGENCY: Institute of Museum and Library Services, National Foundation On.... IMLS amends 45 CFR 1180.46, Evaluation by the grantee, to ensure that IMLS requirements conform to the...

  11. 20 CFR 669.510 - What planning documents must an NFJP grantee submit?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What planning documents must an NFJP grantee submit? 669.510 Section 669.510 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF... Accountability, Planning and Waiver Provision § 669.510 What planning documents must an NFJP grantee submit? Each...

  12. Third EC/ISOE workshop on occupational exposure management at nuclear power plants

    International Nuclear Information System (INIS)

    Bone, Mike; Morris, Simon

    2002-01-01

    The third workshop was jointly sponsored by the IAEA and OECD Nuclear Energy Agency. It was organised by the European Commission Directorate-General for the Environment, Nuclear Safety and Civil Protection and the ISOE European Regional Technical Centre. The workshop provided a forum for Health Physics practitioners and operators to exchange information and experience on occupational exposure issues at Nuclear Power Plants (NPPs). There were approximately 130 participants of whom 63% were from utilities, 11% from contractors and 26% from regulatory bodies

  13. 20 CFR 632.118 - Nepotism.

    Science.gov (United States)

    2010-04-01

    ... administrative capacity by the Native American grantee, subgrantee or contractor. The Native American grantee may... persons employed in an administrative capacity for the Native American grantee, its subgrantees or... describing all advantages, conflicts and/or disadvantages which may result from the specific personnel action...

  14. 48 CFR 252.229-7004 - Status of contractors as a direct contractor (Spain).

    Science.gov (United States)

    2010-10-01

    ... direct contractor (Spain). 252.229-7004 Section 252.229-7004 Federal Acquisition Regulations System... contractor (Spain). As prescribed in 229.402-70(d), use the following clause: Status of Contractor as a Director Contractor (Spain) (JUN 1997) (a) “Direct Contractor,” as used in this clause, means an individual...

  15. Grantees Guide to Research Databases at IDRC

    International Development Research Centre (IDRC) Digital Library (Canada)

    . 7. 7. Creating search alerts. 9. 8. IDRC Digital Library (IDL). 11. 9. Key contacts. 12. Commercial databases conditions of use. These resources are governed by license agreements which restrict use to IDRC employees and grantees taking ...

  16. Transactions of the criticality alarm systems workshop

    International Nuclear Information System (INIS)

    1988-01-01

    The first Criticality Alarm workshop was held by the US Department of Energy Albuquerque Operations Office in 1985. This second workshop is the first held on an international level. There were 98 persons in attendance. They represented the Department of Energy (DOE) field offices, DOE contractors, the Nuclear Regulatory Commission (NRC), NRC licensees, and agencies in the United Kingdom, France, West Germany, and Japan. Topics were on practices experience, and development. A key value of the workshop was the sharing of critical alarm system experiences, problems, and advances in the state of the art. In addition, several Criticality Alarm Systems (CAS) equipment systems were exhibited. Papers were presented on: nature of criticality accidents; lessons learned from past accidents; application of ANS 8.3 standard; gamma and neutron detection systems; research and development in progress; testing at Oak Ridge and Los Alamos; methods used to place detectors; centralized readout feature; false alarms; trip-point settings; and testing and maintenance. The individual papers have been cataloged separately

  17. Continuing to Build a Community Consensus on the Future of Human Space Flight: Report of the Fourth Community Workshop on Achievability and Sustainability of Human Exploration of Mars (AM IV)

    Science.gov (United States)

    Thronson, Harley A.; Baker, John; Beaty, David; Carberry, Chris; Craig, Mark; Davis, Richard M.; Drake, Bret G.; Cassady, Joseph; Hays, Lindsay; Hoffman, Stephen J.; hide

    2016-01-01

    To continue to build broadly based consensus on the future of human space exploration, the Fourth Community Workshop on Achievability and Sustainability of Human Exploration of Mars (AM IV), organized by Explore Mars, Inc. and the American Astronautical Society, was held at the Double Tree Inn in Monrovia, CA., December 68, 2016. Approximately 60 invited professionals from the industrial and commercial sectors, academia, and NASA, along with international colleagues, participated in the workshop. These individuals were chosen to be representative of the breadth of interests in astronaut and robotic Mars exploration.

  18. 20 CFR 668.650 - Can INA grantees exclude segments of the eligible population?

    Science.gov (United States)

    2010-04-01

    ... eligible population? 668.650 Section 668.650 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... population? (a) No, INA grantees cannot exclude segments of the eligible population. INA grantees must document in their Two Year Plan that a system is in place to afford all members of the eligible population...

  19. 45 CFR 287.160 - What reports must a grantee file regarding financial operations?

    Science.gov (United States)

    2010-10-01

    ... Requirements § 287.160 What reports must a grantee file regarding financial operations? (a) Grantees will use SF-269A to make an annual financial report of expenditures for program activities and services. (b) Two annual financial reports will be due to the appropriate Regional Office. The interim SF-269A is...

  20. Minnowbrook IV: 2003 Workshop on Transition and Unsteady Aspects of Turbomachinery Flows

    Science.gov (United States)

    LaGraff, John E. (Editor); Ashpis, David E.

    2004-01-01

    This Minnowbrook IV 2003 workshop on Transition and Unsteady Aspects of Turbomachinery Flows includes the following topics: 1) Current Issues in Unsteady Turbomachinery Flows; 2) Global Instability and Control of Low-Pressure Turbine Flows; 3) Influence of End Wall Leakage on Secondary Flow Development in Axial Turbines; 4) Active and Passive Flow Control on Low Pressure Turbine Airfoils; 5) Experimental and Numerical Investigation of Transitional Flows as Affected by Passing Wakes; 6) Effects of Freestream Turbulence on Turbine Blade Heat Transfer; 7) Bypass Transition Via Continuous Modes and Unsteady Effects on Film Cooling; 8) High Frequency Surface Heat Flux Imaging of Bypass Transition; 9) Skin Friction and Heat Flux Oscillations in Upstream Moving Wave Packets; 10) Transition Mechanisms and Use of Surface Roughness to Enhance the Benefits of Wake Passing in LP Turbines; 11) Transient Growth Approach to Roughness-Induced Transition; 12) Roughness- and Freestream-Turbulence-Induced Transient Growth as a Bypass Transition Mechanism; 13) Receptivity Calculations as a Means to Predicting Transition; 14) On Streamwise Vortices in a Curved Wall Jet and Their Effect on the Mean Flow; 15) Plasma Actuators for Separation Control of Low Pressure Turbine Blades; 16) Boundary-Layer Separation Control Under Low-Pressure-Turbine Conditions Using Glow-Discharge Plasma Actuators; 17) Control of Separation for Low Pressure Turbine Blades: Numerical Simulation; 18) Effects of Elevated Free-Stream Turbulence on Active Control of a Separation Bubble; 19) Wakes, Calming and Transition Under Strong Adverse Pressure Gradients; 20) Transitional Bubble in Periodic Flow Phase Shift; 21) Modelling Spots: The Calmed Region, Pressure Gradient Effects and Background; 22) Modeling of Unsteady Transitional Flow on Axial Compressor Blades; 23) Challenges in Predicting Component Efficiencies in Turbomachines With Low Reynolds Number Blading; 24) Observations on the Causal Relationship Between

  1. 77 FR 11559 - Submission for OMB Review; Comment Request DERT Extramural Grantee Data Collection

    Science.gov (United States)

    2012-02-27

    ... areas and gaps in the research. Information gained from this primary data collection will be used in...; Comment Request DERT Extramural Grantee Data Collection SUMMARY: Under the provisions of Section 3507(a)(1... currently valid OMB control number. Proposed Collection: Title: DERT Extramural Grantee Data Collection...

  2. 77 FR 60128 - Noncompetitive Supplements to Nursing Assistant and Home Health Aide Program Grantees

    Science.gov (United States)

    2012-10-02

    ... Noncompetitive Supplements to Nursing Assistant and Home Health Aide Program Grantees AGENCY: Health Resources... expansion supplements of $100,000 to 10 Nursing Assistant and Home Health Aide (NAHHA) Program grantees to... Management; Care Coordination and Follow Up; and Behavioral Health and Social Support for Home Health Aides...

  3. 40 CFR 35.936-5 - Grantee responsibility.

    Science.gov (United States)

    2010-07-01

    ... accomplishment of the project for which EPA grant assistance is awarded. The grantee is responsible for the... into under the grant (except as § 35.936-6 provides) in accordance with sound business judgment and good administrative practice. This includes issuance of invitations for bids or requests for proposals...

  4. Resources for IDRC grantees | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Our Research Support team develops tools and provides assistance to grantees. You must be an IDRC-funded researcher or IDRC staff member to use these services. Document delivery requests: Find out how to request journal articles that are not available in full text. Document delivery service: Order scholarly articles that ...

  5. 75 FR 24571 - Designation of New Grantee

    Science.gov (United States)

    2010-05-05

    ...) has considered the application (filed 03/17/2010) submitted by the Southern California Logistics... the City of Victorville, which has accepted such reissuance subject to approval by the FTZ Board. Upon... recognizes the City of Victorville as the new grantee of Foreign-Trade Zone 243, subject to the FTZ Act and...

  6. Workshop on rock mechanics issues in repository design and performance assessment

    International Nuclear Information System (INIS)

    1996-04-01

    The Center for Nuclear Waste Regulatory Analyses organized and hosted a workshop on ''Rock Mechanics Issues in Repository Design and Performance Assessment'' on behalf its sponsor the U.S. Nuclear Regulatory Commission (NRC). This workshop was held on September 19- 20, 1994 at the Holiday Inn Crowne Plaza, Rockville, Maryland. The objectives of the workshop were to stimulate exchange of technical information among parties actively investigating rock mechanics issues relevant to the proposed high-level waste repository at Yucca Mountain and identify/confirm rock mechanics issues important to repository design and performance assessment The workshop contained three technical sessions and two panel discussions. The participants included technical and research staffs representing the NRC and the Department of Energy and their contractors, as well as researchers from the academic, commercial, and international technical communities. These proceedings include most of the technical papers presented in the technical sessions and the transcripts for the two panel discussions

  7. 77 FR 9664 - Funds for Leadership Training in Pediatric Dentistry's Current Grantees; One-Year Extension

    Science.gov (United States)

    2012-02-17

    ... Leadership Training in Pediatric Dentistry's Current Grantees; One-Year Extension AGENCY: Health Resources... Funds for Leadership Training in Pediatric Dentistry's (T17) Current Grantees. SUMMARY: The Health... for the Leadership Training in Pediatric Dentistry awards to Columbia University, The Regents of the...

  8. 45 CFR 2516.810 - What types of evaluations are grantees and subgrantees required to perform?

    Science.gov (United States)

    2010-10-01

    ... Welfare (Continued) CORPORATION FOR NATIONAL AND COMMUNITY SERVICE SCHOOL-BASED SERVICE-LEARNING PROGRAMS...? All grantees and subgrantees are required to perform internal evaluations which are ongoing efforts to assess performance and improve quality. Grantees and subgrantees may, but are not required to, arrange...

  9. 76 FR 30388 - Agency Information Collection Activities: New collection Semi-Annual Progress Report for Grantees...

    Science.gov (United States)

    2011-05-25

    ... Grantees from the Services, Training, Education and Policies to Reduce Domestic Violence, Dating Violence... collection Semi- Annual Progress Report for Grantees From the Services, Training, Education and Policies To Reduce Domestic Violence, Dating Violence, Sexual Assault and Stalking in Secondary Schools Grant Program...

  10. 20 CFR 632.11 - Designation of Native American grantees.

    Science.gov (United States)

    2010-04-01

    ... the grantee's attention in writing as a result of monitoring activities, reviews, assessments, etc. (7...) Failure to have maintained cost controls resulting in excess cash on hand. (11) Failure to procure or...

  11. From demand driven contractor selection towards value driven contractor selection

    NARCIS (Netherlands)

    Walraven, A.R.; Vries, de B.

    2009-01-01

    The procurement of a construction contractor should consider more aspects than only cost or price. Taking value and price into account to select the ‘best value for money’ bid results in adopting a structured multicriteria approach. An alternative contractor selection method is presented, which

  12. Regional IV Technical Training Workshops in Transportation: Financing in the 1990's, Selected Presentations

    Science.gov (United States)

    1993-05-01

    The workshop offered sixteen individual workshops and five group sessions dealing with a variety of topics related to generating funding, operating efficiencies and cost savings for rural and small urban providers. The subject areas covered in this r...

  13. Grantees Guide for Research Database at IDRC (English)

    International Development Research Centre (IDRC) Digital Library (Canada)

    Commercial databases conditions of use. These resources are governed by license agreements which restrict use to IDRC employees and grantees taking part in projects funded by. IDRC. It is the responsibility of each user to use these products only for individual, noncommercial use without systematically downloading ...

  14. 76 FR 4895 - Workshop To Discuss Issues Related to the Potential Development of Multipollutant Science and...

    Science.gov (United States)

    2011-01-27

    .... The EPA contractor, ICF International, Inc., is providing logistical support for the workshop. FOR... should be directed to Courtney Skuce at ICF International, Inc., telephone: 919-293-1660; e- mail: EPA... will be taken into account as EPA develops future plans, approaches, and processes for moving toward...

  15. Uganda cabinet approves policy initiated by IDRC grantee | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    2016-06-28

    Jun 28, 2016 ... The Economic Policy Research Centre (EPRC), an IDRC grantee under the ... on May 4, 2016, with cabinet approval of their National Fertilizer Policy. ... that 20% of the country's population has some form of physical disability.

  16. Workshop on rock mechanics issues in repository design and performance assessment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The Center for Nuclear Waste Regulatory Analyses organized and hosted a workshop on ``Rock Mechanics Issues in Repository Design and Performance Assessment`` on behalf its sponsor the U.S. Nuclear Regulatory Commission (NRC). This workshop was held on September 19- 20, 1994 at the Holiday Inn Crowne Plaza, Rockville, Maryland. The objectives of the workshop were to stimulate exchange of technical information among parties actively investigating rock mechanics issues relevant to the proposed high-level waste repository at Yucca Mountain and identify/confirm rock mechanics issues important to repository design and performance assessment The workshop contained three technical sessions and two panel discussions. The participants included technical and research staffs representing the NRC and the Department of Energy and their contractors, as well as researchers from the academic, commercial, and international technical communities. These proceedings include most of the technical papers presented in the technical sessions and the transcripts for the two panel discussions. Selected papers have been indexed separately for inclusion the Energy Science and Technology Database.

  17. 20 CFR 641.550 - What responsibility do grantees/subgrantees have to place participants in unsubsidized employment?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What responsibility do grantees/subgrantees... EMPLOYMENT PROGRAM Services to Participants § 641.550 What responsibility do grantees/subgrantees have to place participants in unsubsidized employment? Because one goal of the program is to foster economic...

  18. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa; Jones, Katherine A

    2016-05-01

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.

  19. 76 FR 39015 - Contractor Performance Information

    Science.gov (United States)

    2011-07-05

    ...] Contractor Performance Information AGENCY: Environmental Protection Agency (EPA), ACTION: Direct final rule... contractor performance information. EPA is issuing a final rule because the changes are procedural in nature... Institutes of Health's Contractor Performance System (CPS) to the Department of Defense's Contractor...

  20. Contractor Selection in Saudi Arabia

    OpenAIRE

    M. A. Bajaber; M. A. Taha

    2012-01-01

    Contractor selection in Saudi Arabia is very important due to the large construction boom and the contractor role to get over construction risks. The need for investigating contractor selection is due to the following reasons; large number of defaulted or failed projects (18%), large number of disputes attributed to contractor during the project execution stage (almost twofold), the extension of the General Agreement on Tariffs and Trade (GATT) into construction industry, and finally the few ...

  1. 48 CFR 46.105 - Contractor responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is..., and furnishing such information to the Government as required. (b) The contractor may be required to...

  2. 49 CFR 199.245 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.245 Section 199.245... Prevention Program § 199.245 Contractor employees. (a) With respect to those covered employees who are contractors or employed by a contractor, an operator may provide by contract that the alcohol testing...

  3. 77 FR 43535 - Grantee Codes for Certified Radiofrequency Equipment

    Science.gov (United States)

    2012-07-25

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 2 [FCC 12-60] Grantee Codes for Certified Radiofrequency Equipment AGENCY: Federal Communications Commission. ACTION: Final rule. SUMMARY: This document... authorization program for radiofrequency (RF) devices under part 2 of its rules. This program is one of the...

  4. 49 CFR 199.115 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.115 Section 199.115... § 199.115 Contractor employees. With respect to those employees who are contractors or employed by a contractor, an operator may provide by contract that the drug testing, education, and training required by...

  5. 7 CFR 1726.27 - Contractor's bonds.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Contractor's bonds. 1726.27 Section 1726.27... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.27 Contractor's bonds. (a) RUS Form 168b, Contractor's Bond, shall be used when a contractor's bond is required by RUS Forms 200, 257...

  6. 48 CFR 47.207-5 - Contractor responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be... furnished by the contractor. Otherwise, state that the contractor shall furnish clean and sound closed-type...

  7. 48 CFR 18.102 - Central contractor registration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Central contractor... Central contractor registration. Contractors are not required to be registered in the Central Contractor.... (See 4.1102). However, contractors are required to register with CCR in order to gain access to the...

  8. Assessment of training and technical assistance needs of Colorectal Cancer Control Program Grantees in the U.S.

    Science.gov (United States)

    Escoffery, Cam; Hannon, Peggy; Maxwell, Annette E; Vu, Thuy; Leeman, Jennifer; Dwyer, Andrea; Mason, Caitlin; Sowles, Shaina; Rice, Ketra; Gressard, Lindsay

    2015-01-31

    Practitioners often require training and technical assistance to build their capacity to select, adapt, and implement evidence-based interventions (EBIs). The CDC Colorectal Cancer Control Program (CRCCP) aims to promote CRC screening to increase population-level screening. This study identified the training and technical assistance (TA) needs and preferences for training related to the implementation of EBIs among CRCCP grantees. Twenty-nine CRCCP grantees completed an online survey about their screening activities, training and technical assistance in 2012. They rated desire for training on various evidence-based strategies to increase cancer screening, evidence-based competencies, and program management topics. They also reported preferences for training formats and facilitators and barriers to trainings. Many CRCCP grantees expressed the need for training with regards to specific EBIs, especially system-level and provider-directed EBIs to promote CRC screening. Grantees rated these EBIs as more difficult to implement than client-oriented EBIs. Grantees also reported a moderate need for training regarding finding EBIs, assessing organizational capacity, implementing selected EBIs, and conducting process and outcome evaluations. Other desired training topics reported with higher frequency were partnership development and data collection/evaluation. Grantees preferred training formats that were interactive such as on-site trainings, webinars or expert consultants. Public health organizations need greater supports for adopting evidence-based interventions, working with organizational-level change, partnership development and data management. Future capacity building efforts for the adoption of EBIs should focus on systems or provider level interventions and key processes for health promotion and should be delivered in a variety of ways to assist local organizations in cancer prevention and control.

  9. Proceedings of the Workshop on Current and Emerging methods for Optimising Safety and Efficiency in Nuclear Decommissioning

    International Nuclear Information System (INIS)

    2017-02-01

    The workshop was organised by the Institute for Energy Technology (IFE) on behalf of the OECD Halden Reactor Project (OECD-HRP) and in collaboration with the International Atomic Energy Agency (IAEA) and the Nuclear Energy Agency (NEA). The workshop brought together more than 100 people (operators, regulators, scientists, consultants, and contractors) from 25 countries. Program: Day 1 - Successful application of R and D in decommissioning and future needs (Welcome and Opening Speeches; Session 1: Workshop Introductory Presentations; Session 2: Experience from starting, on-going and completed decommissioning projects). Day 2 - R and D and application of advanced technologies for decommissioning (Session 3: New technologies for decommissioning; Session 4: Advanced information technologies for decommissioning). Day 3 - Improving decommissioning management on project, national and international level (Session 5: Challenges and methods for improving decommissioning; Session 6: Workshop closing)

  10. Minutes of the third annual workshop on chromate replacements in light metal finishing

    Energy Technology Data Exchange (ETDEWEB)

    Guilinger, T.R.; Buchheit, R.G.; Kelly, M.J. [and others

    1994-05-01

    Goal of the workshop was to bring together coating researchers, developers, and users from a variety of industries (defense, automotive, aerospace, packaging) to discuss new coating ideas from the perspective not only of end user, but also the coating supplier, developer, and researcher. The following are included in this document: workshop agenda, list of attendees, summary of feedback, workshop notes compiled by organizers, summaries of Sessions II and IV by session moderators, and vugraphs and abstracts.

  11. 48 CFR 1845.502 - Contractor responsibility.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor responsibility. 1845.502 Section 1845.502 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Contractors 1845.502 Contractor responsibility. ...

  12. 48 CFR 1609.471 - Contractor certification.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor certification... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1609.471 Contractor certification. All FEHBP carriers and applicant carriers...

  13. 48 CFR 1602.170-4 - Contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor. 1602.170-4 Section 1602.170-4 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES... 1602.170-4 Contractor. Contractor means carrier. ...

  14. Proceedings of the DOE/Yucca Mountain Site Characterization Project Radionuclde Adsorption Workshop at Los Alamos National Laboratory, September 11--12, 1990

    International Nuclear Information System (INIS)

    Canepa, J.A.

    1992-08-01

    Los Alamos National Laboratory hosted a workshop on radionuclide adsorption for the Department of Energy (DOE)/Yucca Mountain Site Characterization Project on September 11 and 12, 1990. The purpose of the workshop was to respond to a recommendation by the Nuclear Waste Technical Review Board that the DOE organize a radionuclide adsorption workshop to be attended by the DOE and its contractors involved in the measurement and modeling of such adsorption. The workshop would have two general purposes: (a) to determine the applicability of available radionuclide adsorption data on tuff and models for predicting such adsorption under existing and postclosure conditions at Yucca Mountain and (b) to establish what additional radionuclide adsorption research and model development are needed. Individual projects are processed separately for the databases

  15. Meeting the Challenges of Stakeholder Engagement and Communication: Lessons from Teacher Incentive Fund Grantees. The Harvesting Project

    Science.gov (United States)

    Koppich, Julia E.

    2010-01-01

    As of August 2010, a total of 33 states, school districts, charter school coalitions, and other education organizations had received Teacher Incentive Funds (TIF) to redesign compensation programs for teachers and principals. The U.S. Department of Education named a new cohort of TIF grantees on September 23, 2010. TIF grantees have faced a number…

  16. 48 CFR 752.7013 - Contractor-mission relationships.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor-mission....7013 Contractor-mission relationships. For use in all USAID contracts involving performance overseas.... Contractor-Mission Relationships (OCT 1989) (a) The Contractor acknowledges that this contract is an...

  17. Administrative Relief for Grantees impacted by Hurricanes Harvey, Irma, and Maria

    Science.gov (United States)

    On October 26, 2017, the Office of Management and Budget issued the attached memorandum, Administrative Relief for Grantees impacted by Hurricanes, to provide Federal agencies with flexibility to assist their grant applicants and recipients.

  18. 30 CFR 45.4 - Independent contractor register.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Independent contractor register. 45.4 Section... ADMINISTRATIVE REQUIREMENTS INDEPENDENT CONTRACTORS § 45.4 Independent contractor register. (a) Each independent contractor shall provide the production-operator in writing the following information: (1) The independent...

  19. 48 CFR 852.237-70 - Contractor responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor....237-70 Contractor responsibilities. As prescribed in 837.110, insert the following clause: Contractor Responsibilities (APR 1984) The contractor shall obtain all necessary licenses and/or permits required to perform...

  20. 42 CFR 52b.10 - What are the terms and conditions of awards?

    Science.gov (United States)

    2010-10-01

    ... program: (a) Title. The applicant must have a fee simple or other estate or interest in the site... contractor. (l) Notice of Federal Interest. The grantee shall record a Notice of Federal Interest in the... certifies that the grantee institution has fee simple title to the site free and clear of all liens...

  1. 48 CFR 1509.170-8 - Contractor Performance Report.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Performance... AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-8 Contractor Performance Report. (a) Contractor Performance Reports (interim and final) must be prepared...

  2. 48 CFR 52.241-5 - Contractor's Facilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Facilities....241-5 Contractor's Facilities. As prescribed in 41.501(c)(4), insert a clause substantially the same as the following: Contractor's Facilities (FEB 1995) (a) The Contractor, at its expense, unless...

  3. 48 CFR 52.247-28 - Contractor's Invoices.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Invoices. 52....247-28 Contractor's Invoices. As prescribed in 47.207-9(c), insert the following clause in... services: Contractor's Invoices (APR 1984) The Contractor shall submit itemized invoices as instructed by...

  4. 14 CFR 1245.108 - License to contractor.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false License to contractor. 1245.108 Section... INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.108 License to contractor. (a) Each contractor.... The license extends to the contractor's domestic subsidiaries and affiliates, if any, within the...

  5. 48 CFR 725.703 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employees. 725... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.703 Contractor employees. (a... on employees or consultants of either contractors or subcontractors providing services under an USAID...

  6. 48 CFR 33.207 - Contractor certification.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor certification... CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 33.207 Contractor certification. (a) Contractors shall provide the certification specified in paragraph (c) of this section when...

  7. 75 FR 63177 - Availability of FY 09 Grantee Performance Evaluation Reports for the Eight States of EPA Region 4...

    Science.gov (United States)

    2010-10-14

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9213-6] Availability of FY 09 Grantee Performance Evaluation... (EPA). ACTION: Notice of availability; Clean Air Act Section 105 grantee performance evaluation reports...-year evaluations of eight state air pollution control programs (Alabama Department of Environmental...

  8. 48 CFR 1845.502-70 - Contractor-acquired property.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor-acquired... Possession of Contractors 1845.502-70 Contractor-acquired property. All contractor-acquired property must be... contractor-acquired. (2) Submission of DD Form 1419, DOD Industrial Plant Requisition, or equivalent format...

  9. 48 CFR 1252.242-71 - Contractor testimony.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor testimony. 1252... Contractor testimony. As prescribed in (TAR) 48 CFR 1242.7000(b), insert the following clause: Contractor Testimony (OCT 1994) All requests for the testimony of the Contractor or its employees, and any intention to...

  10. Building Healthy Start Grantees' Capacity to Achieve Collective Impact: Lessons from the Field.

    Science.gov (United States)

    Bradley, Kimberly; Chibber, Karuna S; Cozier, Naima; Meulen, Peggy Vander; Ayres-Griffin, Colleen

    2017-12-01

    Purpose While Healthy Start has emphasized the need for multi-sectorial community engagement and collaboration since its inception, in 2014 Healthy Start adopted Collective Impact (CI) as a framework for reducing infant mortality. This paper describes the development of a peer-focused capacity-building strategy that introduced key elements of CI and preliminary findings of Healthy Start grantees' progress with using CI as an approach to collaboration. Description The Collective Impact Peer Learning Networks (CI-PLNs) consisted of eight 90-min virtual monthly meetings and one face-to-face session that reviewed CI pre-conditions and conditions. Evaluation sources included: a facilitated group discussion at the final CI-PLN exploring grantee CI and CAN accomplishments (n = 57); routine evaluations (n = 144 pre, 46 interim, and 40 post PLN) examining changes in knowledge and practices regarding CI; and post CI-PLN implementation, three in-depth interviews with grantees who volunteered to discuss their experience with CI and participation in the CI-PLN. Assessment CI-PLN participants reported increased knowledge and confidence in the application of CI. Several participants reported that the CI-PLN created a space for engaging in peer sharing challenges, successes, and best practices. Participants also reported a desire to continue implementing CI and furthering their learning. Conclusion The CI-PLNs met the initial goal of increasing Healthy Start grantees' understanding of CI and determining the initial focus of their efforts. By year five, the EPIC Center anticipates Healthy Start CANs will have a sustainable infrastructure in place that supports the established common agenda, shared measures, and ongoing and meaningful inclusion of community members.

  11. 13 CFR 119.8 - Are there matching requirements for grantees?

    Science.gov (United States)

    2010-01-01

    ... constraints on the historical and projected ability to raise matching funds as demonstrated by financial statements and letters of rejection from previous funders and potential new funding sources; (2) Evidence of... to the matching requirements of this section. (c) Applicants or grantees with severe constraints on...

  12. 40 CFR 35.6600 - Contractor claims.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contractor claims. 35.6600 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6600 Contractor claims. (a) General... prepared by the contractor to support a claim against the recipient; and (4) The award official determines...

  13. 77 FR 52022 - Availability of FY 11 Grantee Performance Evaluation Reports for the Eight States of EPA Region 4...

    Science.gov (United States)

    2012-08-28

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9721-4] Availability of FY 11 Grantee Performance Evaluation Reports for the Eight States of EPA Region 4 and 17 Local Agencies AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability; Clean Air Act Section 105 grantee performance evaluation reports...

  14. 76 FR 64086 - Availability of FY 10 Grantee Performance Evaluation Reports for the Eight States of EPA Region 4...

    Science.gov (United States)

    2011-10-17

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9478-7] Availability of FY 10 Grantee Performance Evaluation Reports for the Eight States of EPA Region 4 and 17 Local Agencies AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability; Clean Air Act Section 105 grantee performance evaluation reports...

  15. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Science.gov (United States)

    2010-07-01

    ..., prior to such employee's engagement in any activity enumerated in section 3(6) of the Act. A farm labor... farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in Farm...

  16. Contractor Performance Assessment Reporting System

    Data.gov (United States)

    US Agency for International Development — CPARS is a web-based system used to input data on contractor performance. Reports from the system are used as an aid in awarding contracts to contractors that...

  17. Sixth national stakeholder workshop summary report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    On June 17--18, 1998, the Department of Energy`s (DOE) Office of Worker and Community Transition convened its sixth National Stakeholder Workshop at the Ramada Plaza Hotel Old Town in Alexandria, Virginia. Approximately 325 stakeholders attended representing DOE headquarters and field offices, contractors, labor organizations, state and local government, education and community interest groups. The meeting addressed the progress made on the issues and challenges identified at the last stakeholder`s meeting in Oakland, California on April 9--11, 1997. Also discussed were the full range of the Department`s work force issues and creative solutions to the inherent challenges of simultaneously implementing the Department`s post Cold-War mission, work force restructuring guidance, contract reform objectives, asset disposition, performance-based management requirements, and business process improvement policies. The format of the Workshop included several plenary sessions and a number of small group discussion sessions. The small group sessions focused on topics related to labor issues, work force restructuring, work force planning, community transition, and employee concerns. The sessions provided a wide range of views on worker and community transition issues. The plenary sessions of the Workshop included presentations on the following topics: welcome and introductions; opening remarks; building a better labor-management relationship; keynote speech from Secretary of Energy Federico Pena; meeting tomorrow`s challenges (early site closures); harnessing the contracting process to encourage local growth; and, the British experience in economic conversion.

  18. 48 CFR 970.4402 - Contractor purchasing system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402 Contractor purchasing system. ...

  19. 20 CFR 641.740 - How will the Department determine whether a grantee fails, meets, or exceeds the expected levels...

    Science.gov (United States)

    2010-04-01

    ... determine whether a grantee fails, meets, or exceeds the expected levels of performance for the core indicators and what will be the consequences of failing to meet expected levels of performance? (a) Aggregate... determine if a national grantee has met the expected levels of performance (including any adjustments to...

  20. Hydrogen Contractors Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Fitzsimmons, Tim [Dept. of Energy (DOE), Washington DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering

    2006-05-16

    This volume highlights the scientific content of the 2006 Hydrogen Contractors Meeting sponsored by the Division of Materials Sciences and Engineering (DMS&E) on behalf of the Office of Basic Energy Sciences (BES) of the U. S. Department of Energy (DOE). Hydrogen Contractors Meeting held from May 16-19, 2006 at the Crystal Gateway Marriott Hotel Arlington, Virginia. This meeting is the second in a series of research theme-based Contractors Meetings sponsored by DMS&E held in conjunction with our counterparts in the Office of Energy Efficiency and Renewable Energy (EERE) and the first with the Hydrogen, Fuel Cells and Infrastructure Technologies Program. The focus of this year’s meeting is BES funded fundamental research underpinning advancement of hydrogen storage. The major goals of these research efforts are the development of a fundamental scientific base in terms of new concepts, theories and computational tools; new characterization capabilities; and new materials that could be used or mimicked in advancing capabilities for hydrogen storage.

  1. Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, A.

    2011-10-01

    This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVAC companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational

  2. 44 CFR 13.24 - Matching or cost sharing.

    Science.gov (United States)

    2010-10-01

    ... donated. (f) Valuation of grantee or subgrantee donated real property for construction/acquisition. If a....25(g).) (5) Services or property financed by income earned by contractors. Contractors under a grant... from the party awarding the contract. No costs of services or property supported by this income may...

  3. 28 CFR 66.24 - Matching or cost sharing.

    Science.gov (United States)

    2010-07-01

    ... donated. (f) Valuation of grantee or subgrantee donated real property for construction/acquisition. If a... described in § 66.25(g).) (5) Services or property financed by income earned by contractors. Contractors... amounts earned from the party awarding the contract. No costs of services or property supported by this...

  4. 34 CFR 80.24 - Matching or cost sharing.

    Science.gov (United States)

    2010-07-01

    ... donated. (f) Valuation of grantee or subgrantee donated real property for construction/acquisition. If a....25(g).) (5) Services or property financed by income earned by contractors. Contractors under a grant... from the party awarding the contract. No costs of services or property supported by this income may...

  5. 45 CFR 1157.24 - Matching or cost sharing.

    Science.gov (United States)

    2010-10-01

    ... time it was donated. (f) Valuation of grantee or subgrantee donated real property for construction... § 1157.25(g).) (5) Services or property financed by income earned by contractors. Contractors under a... earned from the party awarding the contract. No costs of services or property supported by this income...

  6. Mont Terri Project - Proceedings of the 10 Year Anniversary Workshop

    International Nuclear Information System (INIS)

    Hugi, M.; Bossart, P.; Hayoz, P.

    2007-01-01

    This book is a compilation of 12 reports presented at the St-Ursanne workshop. The workshop was dedicated to the scientific community of the Mont Terri partner organisations, their management and scientific/technical staff, involved research organisations and key contractors. The purpose of the event was to acknowledge the excellent research work that has been performed over the last decade, to evaluate and discuss the present state of knowledge in selected research areas and to explore the potential for future research activities. The topical areas addressed in the workshop are of particular importance with regard to deep geological disposal of radioactive waste and focused on the issues of coupled phenomena and transport processes in argillaceous rock and the demonstration (in underground rock laboratories) of disposal feasibility. After showing the history of the Mont Terri project and the general geology of Northwestern Switzerland, the different presentations are distributed into 3 topics: (a) Coupled phenomena in argillaceous rock, (b) Transport processes in argillaceous rock, and (c) Demonstration of disposal feasibility in underground rock laboratories. The last chapter describes the research still needed and the Mont Terri rock laboratory

  7. 76 FR 64954 - Proposed Collection; Comment Request; Grantee Outcomes and Satisfaction

    Science.gov (United States)

    2011-10-19

    ... Request; Grantee Outcomes and Satisfaction SUMMARY: In compliance with the requirement of Section 3506(c... health science; (2) Contribution of research findings to program goals and objectives; (3) Satisfaction... of research. Satisfaction information to be collected includes measures of satisfaction with the type...

  8. 48 CFR 52.246-1 - Contractor Inspection Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Inspection....246-1 Contractor Inspection Requirements. As prescribed in 46.301, insert the following clause: Contractor Inspection Requirements (APR 1984) The Contractor is responsible for performing or having...

  9. 34 CFR 380.20 - What requirements must a grantee meet before it provides for the transition of an individual in...

    Science.gov (United States)

    2010-07-01

    ... REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS AND DEMONSTRATIONS FOR PROVIDING SUPPORTED EMPLOYMENT SERVICES TO INDIVIDUALS WITH THE MOST SEVERE DISABILITIES AND TECHNICAL ASSISTANCE PROJECTS What Post-Award Conditions Must Be Met by a Grantee? § 380.20 What requirements must a grantee meet before...

  10. 48 CFR 970.5244-1 - Contractor purchasing system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970.4403 insert the following clause: Contractor Purchasing System (AUG 2009) (a) General. The Contractor...

  11. 48 CFR 52.204-7 - Central Contractor Registration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Central Contractor....204-7 Central Contractor Registration. As prescribed in 4.1105, use the following clause: Central Contractor Registration (APR 2008) (a) Definitions. As used in this clause— Central Contractor Registration...

  12. Environmental liability and the independent contractor

    International Nuclear Information System (INIS)

    Gilmour, B.S.

    1999-01-01

    The provisions of the Environmental Protection and Enhancement Act (EPEA) regarding the relationship between a company and an independent contractor were reviewed. The EPEA was introduced in September 1993 and significantly altered the environmental laws in the province of Alberta. The provisions of the EPEA that apply to the petroleum industry are conservation and reclamation as well as provisions concerning release of substances, contaminated sites and penalties. Companies that pollute may be held liable for reclamation, even if the work was carried out by an independent contractor and despite the fact that the independent contractor is not an employee of the company. Under the current EPEA laws, companies may not be able to effectively shift responsibility for environmental liabilities to independent contractors even where the contractor was negligent. This paper presented suggestions regarding contractor agreements and due diligence to help minimize the risk of liability to companies. The paper also discussed the following two types of liabilities under the EPEA's harmful substances section: (1) the obligation to clean up an affected area, and (2) fines and penalties that may be imposed when an offence is committed

  13. Report on the symposium and workshop on the 5 MWt solar thermal test facility

    Energy Technology Data Exchange (ETDEWEB)

    1976-01-01

    Design concepts and applications for the 5 MWt Solar Thermal Test Facility at Albuquerque are discussed in 43 papers. Session topics include central receivers, solar collectors, solar energy storage, high temperature materials and chemistry. A program overview and individual contractor reports for the test facility project are included, along with reports on conference workshop sessions and users group recommendations. A list of conference attendees is appended. Separate abstracts are prepared for 39 papers.

  14. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...

  15. Fourteenth annual report radiation exposures for DOE and DOE contractor employees - 1981

    International Nuclear Information System (INIS)

    1983-03-01

    All Department of Energy (DOE) and DOE contractors are required by DOE Order 5484.1, Chapter IV, to submit occupational exposure records to a central repository. The data required includes a summary of whole-body exposures to ionizing radiation, a summary of internal depositions of radioactive materials above specified limits, and occupational exposure reports for terminating employees. This report is a summary of the data submitted by DOE and DOE contractors for 1981. A total of 82,873 DOE and DOE contractor employees were monitored for whole-body ionizing radiation exposures in 1981. In addition to the employees, 84,343 visitors were monitored. Of all employees monitored, 54.43% received a dose equivalent that was less than measurable, 44.04% a measurable exposure less than 1 rem, and 1.53% an exposure granter than 1 rem. the exposure received by 88.14% of the visitors to DOE facilities was less than measurable. Only 11.85% of the visitors received a measurable exposure less than 1 rem, and 0.0% of the visitors received an exposure greater than 1 rem. No employees or visitors received a dose equivalent greater than 5 rem. The collective dose equivalent for DOE and DOE contractors employees was 6,902 person-rem. The collective dose equivalent for visitors was 579 person-rem. The total dose equivalent for employees and visitors combined was 7,481 person-rem. The average dose equivalent for all individuals (employees and visitors) monitored was 45 mrem and the average dose equivalent for all individuals who received a measurable exposure was 157 mrem. The highest average dose equivalent was observed for employees monitored at fuel processing facilities (342 mrem) and the lowest among visitors (7 mrem) to DOE facilities. These averages are significantly less than the DOE 5-rem/year radiation protection standard for whole-body exposures

  16. 20 CFR 668.296 - How are WIA funds allocated to INA grantees?

    Science.gov (United States)

    2010-04-01

    ... unable to serve its area for any reason, such as audit or debt problems, criminal activity, internal (political) strife, or lack of ability or interest. Funds may also be reallocated if a grantee has carry-in...

  17. 40 CFR 68.87 - Contractors.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... specialty work on or adjacent to a covered process. It does not apply to contractors providing incidental...

  18. 34 CFR 386.35 - What information must be provided by a grantee that is an institution of higher education to...

    Science.gov (United States)

    2010-07-01

    ... an institution of higher education to assist designated State agencies? 386.35 Section 386.35... grantee that is an institution of higher education to assist designated State agencies? A grantee that is an institution of higher education provided assistance under this part shall cooperate with the...

  19. Teacher Incentive Fund: First Implementation Report, 2006 and 2007 Grantees

    Science.gov (United States)

    Humphrey, Daniel C.; Gallagher, H. Alix; Yee, Kaily M.; Goss, G. Kyle; Campbell, Ashley Z.; Cassidy, Lauren J.; Mitchell, Nyema M.

    2012-01-01

    The Teacher Incentive Fund (TIF) supports projects that are designed to reform teacher and principal compensation. Initially, the Department of Education (the Department) made two rounds of awards, in 2006 and 2007, to a total of 34 grantees. The specific goals of TIF were to reward teachers and principals for improving student achievement,…

  20. 78 FR 11164 - Policy on Contractor Profits

    Science.gov (United States)

    2013-02-15

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System Policy on Contractor Profits AGENCY... Authorization Act for Fiscal Year 2013. Section 804, Department of Defense Policy on Contractor Profits... modifications to such guidelines that are necessary to ensure an appropriate link between contractor profit and...

  1. 48 CFR 46.301 - Contractor inspection requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inspection... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.301 Contractor inspection requirements. The contracting officer shall insert the clause at 52.246-1, Contractor Inspection Requirements, in solicitations...

  2. 48 CFR 970.5203-3 - Contractor's organization.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor's organization... for Management and Operating Contracts 970.5203-3 Contractor's organization. As prescribed in 970.0371-9, insert the following clause: Contractor's Organization (DEC 2000) (a) Organization chart. As...

  3. 48 CFR 450.303-1 - Contractor requests.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contractor requests. 450.303-1 Section 450.303-1 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS Contract Adjustments 450.303-1 Contractor requests. Contractor...

  4. 48 CFR 2427.305-2 - Follow-up by contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Follow-up by contractor....305-2 Follow-up by contractor. (b) Contractor reports. Contractors shall complete and submit to the... Contracting Officer shall send the form to those contractors whose contract work may have required the...

  5. 32 CFR 989.23 - Contractor prepared documents.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Contractor prepared documents. 989.23 Section... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.23 Contractor prepared documents. All Air Force... should reflect on the cover sheet they are an Air Force document. Contractor preparation information...

  6. 6 CFR 25.8 - Government contractor Defense.

    Science.gov (United States)

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Government contractor Defense. 25.8 Section 25.8...-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.8 Government contractor Defense. (a) Criteria for... applicability of the government contractor defense. In determining whether to issue such Certification, the...

  7. 42 CFR 455.202 - Limitation on contractor liability.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Limitation on contractor liability. 455.202 Section... § 455.202 Limitation on contractor liability. (a) A program contractor, a person, or an entity employed... contractor will not be held to have violated any criminal law and will not be held liable in any civil action...

  8. Workshop 'Reducing the share of drilling in the total cost of geothermal power generation'; Workshop 'Senkung des bohrtechnischen Anteils an den geothermischen Stromgestehungskosten'

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    For a further development of geothermal power generation, technological adaptations of drilling technology will be required that will reduce the specific power generation cost. This workshop discussed the options for adaptation and the resulting cost improvements. Both technical and non-technical issues were tackled. The full-text documents of the workshop (overheads) can be downloaded at http://www.ie-leipzig.de. Subjects were: (1) Downhole engine technology; (2) New drilling equipment in consideration of geothermal requirements; (3) New drilling equipment in consideration of geothermal requirements; (4) Innovative drilling concepts/ Current cost allotment; (5) Higher efficiency in drilling with flushing adapted to drilling horizons; (6) MWD/LWD technologies of the KW industry; (7) Completion technology in geothermal plants; (8) Time and cost planning in drilling plans; (9) Cost-optimized drilling from a drilling contractor's view; (10) Requirements and obstacles in the licensing of new drilling equipment. (orig.)

  9. Proceedings of 'workshop on Pb-alloy cooled fast reactor'

    International Nuclear Information System (INIS)

    Kim, Sang Ji; Kim, Yong Hee; Hong, Ser Gi

    2003-06-01

    The objective of 'Workshop on Pb-Alloy Cooled Fast Reactor', held in Taejeon, Korea on May 6, 2003, is to enhance the basic knowledge in this area by facilitating the exchange of information and discussions about problematic area of design aspects. There were five presentations from three different countries and about 25 participants gathered during the workshop. The topics covered in the workshop include benefits and drawbacks of Pb-alloy and Sodium coolant, two Pb-alloy cooled 900 MWt reactor designs using both B4C rods and NSTs, BREST-300 breakeven reactor and transmutation effectiveness of LLFPs in the typical thermal/fast neutron systems. The generic conclusion for the Pb-alloy cooled fast reactor from this workshop is as follows: 1) It has a potential to satisfy the goals established for the Generation-IV reactor concepts, so it has a bright future. 2) As a fast neutron system with a moderate breeding or a conversion, it is flexible in its roles and has superior safety characteristics over sodium coolant because of Pb-alloy's chemical inertness with water/air and high boiling temperature

  10. Leading Education Innovations in Rural Schools: Reflections from i3 Grantees

    Science.gov (United States)

    Fox, Tom; Friedrich, Linda; Harmon, Hobart; McKithen, Clarissa; Phillips, Andie; Savell, Susan; Schaefer, Victoria; Silva, Mihiri

    2017-01-01

    The Investing in Innovation (i3) Improving Rural Achievement Community, a professional learning community of grantees under the US Department of Education's i3 program, created this document to share knowledge and experiences related to working in rural districts across the United States. Grounded in field-based experiences and lessons, it serves…

  11. Military Contractors - Too Much Dependence

    National Research Council Canada - National Science Library

    Hill, Nathan E

    2008-01-01

    .... There is undoubtedly a need for military contractors and there are numerous positive arguments in their favor. However, the negative arguments have not been highlighted enough recently and the scales are now out of balance. The intent of this research paper is to encourage the U.S. military to rebalance the scales and curb the over-reliance on contractors.

  12. The responsibility of the contractor for project deficiencies

    Directory of Open Access Journals (Sweden)

    Pušac Jovana

    2011-01-01

    Full Text Available In this paper the author analyzes a civil law responsibility of the Contractor for project deficiencies resulting in reduced quality of the construction, i.e. not affecting its solidity. Primary obligation of the Contractor is to perform works in compliance with professional standards, the contract and the approved project. The Contractor cannot change the approved project at will, even when he has designed it. Hence, the question must be raised of the obligation of the Contractor to strictly abide by the project, assigned to him by the Authority, regardless of evident deficiencies of the Project and of his responsibility for performing works in compliance with the said project resulting in deficiencies in the construction, that is construction works. If the latter hypothesis is correct, then it must be established what deficiencies in the project fall under the responsibility of the Contractor (visible or hidden, i.e. the issue of dividing responsibility between the Project Designer and the Contractor in terms of the project deficiencies must be set up and solved. Finally, it is also important to define the realization of rights and duties of the Contractor in case the Contractor has to recede from the Project. In this paper the author tries to offer detail and complete answers to raised questions.

  13. 48 CFR 952.251-70 - Contractor employee travel discounts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employee travel... Contractor employee travel discounts. As prescribed in 951.7002, insert the following clause: Contractor Employee Travel Discounts (AUG 2009) (a) The Contractor shall take advantage of travel discounts offered to...

  14. 48 CFR 245.608 - Screening of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Screening of contractor inventory. 245.608 Section 245.608 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Disposal of Contractor Inventory 245.608 Screening of contractor inventory. ...

  15. 48 CFR 1553.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor qualifications. 1553.209 Section 1553.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209 Contractor qualifications. ...

  16. 48 CFR 45.501 - Prime contractor alternate locations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Prime contractor alternate... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property Administration 45.501 Prime contractor... administration from another contract administration office, for purposes of evaluating prime contractor...

  17. 48 CFR 1852.209-72 - Composition of the contractor.

    Science.gov (United States)

    2010-10-01

    ... contractor. 1852.209-72 Section 1852.209-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one legal...

  18. 48 CFR 53.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor qualifications. 53.209 Section 53.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.209 Contractor qualifications. ...

  19. 48 CFR 2936.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor... Construction 2936.201 Evaluation of contractor performance. The HCA must establish procedures to evaluate construction contractor performance and prepare performance reports as required by FAR 36.201. ...

  20. 48 CFR 1552.209-76 - Contractor performance evaluations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor performance... 1552.209-76 Contractor performance evaluations. As prescribed in section 1509.170-1, insert the following clause in all applicable solicitations and contracts. Contractor Performance Evaluations (OCT 2002...

  1. 48 CFR 8.406-7 - Contractor Performance Evaluation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor Performance... ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 8.406-7 Contractor Performance Evaluation. Ordering activities must prepare an evaluation of contractor performance for each...

  2. 48 CFR 32.909 - Contractor inquiries.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inquiries. 32.909 Section 32.909 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Prompt Payment 32.909 Contractor inquiries. (a) Direct questions...

  3. The Community's R and D programme on management and storage of radioactive waste

    International Nuclear Information System (INIS)

    McMenamin, T.

    1990-05-01

    This list of publications covers reports, proceedings, communications and information leaflets produced and published in the frame of the cost-sharing research programme of the Commission of the European Communities on radioactive waste management and disposal. The list, which is regularly updated, includes: (i) reports of contractors on research supported by the Commission; (ii) reports on research in coordinated actions, assembled and edited by the Commission staff or on behalf of the Commission; (iii) proceedings of meetings, conferences and workshops organized and edited by the Commission staff; (iv) scientific reports, communications, annual progress reports and information leaflets produced and edited by the Commission staff. Not included are contributions of contractors and staff to national or international meetings, workshops, conferences and expert groups. Work performed by the Commission's Joint Research Centre (JRC) in the field of radioactive waste management is not mentioned here - information on the JRC activities and publications may be found in the annual JRC progress reports and the bi-annual information leaflet EC-Focus

  4. National Radon Contractor Proficiency Program. Proficiency report: Supplement

    International Nuclear Information System (INIS)

    1991-02-01

    The report, a supplement to the RCP Proficiency Report, will further assist governmental officials in providing advice to the public on the selection of proficient radon mitigation contractors. These reports list 1,123 contractors who have met the requirements of the RCP Program as of December 15, 1990. The Proficiency Report provides information on each contractor's name, RCP identification number, company name, address, phone number, and geographic service area. The report provides two additional tables, indexed by company name and by RCP identification number. The report is intended to help users quickly identify a proficient contractor if only the company name is known, or to verify which contractor is associated with a particular ID number

  5. Contractor Software Charges

    National Research Council Canada - National Science Library

    Granetto, Paul

    1994-01-01

    .... Examples of computer software costs that contractors charge through indirect rates are material management systems, security systems, labor accounting systems, and computer-aided design and manufacturing...

  6. 48 CFR 2452.251-70 - Contractor employee travel.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor employee travel... 2452.251-70 Contractor employee travel. As prescribed in 2451.7001, insert the following clause in all cost-reimbursement solicitations and contracts involving travel: Contractor Employee Travel (OCT 1999...

  7. 48 CFR 3036.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor performance. 3036.201 Section 3036.201 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY... contractor performance. (a)(2) Performance reports shall be prepared and entered into the Contractor...

  8. 48 CFR 2152.215-70 - Contractor records retention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor records... PRECONTRACT PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 2152.215-70 Contractor records retention. As prescribed in 2115.071, insert the following clause: Contractor Records Retention (OCT 2005...

  9. 48 CFR 36.506 - Superintendence by the contractor.

    Science.gov (United States)

    2010-10-01

    ... contractor. 36.506 Section 36.506 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Superintendence by the contractor. The contracting officer shall insert the clause at 52.236-6, Superintendence by the Contractor, in solicitations and contracts when a fixed-price construction contract or a fixed...

  10. 48 CFR 1652.204-70 - Contractor records retention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor records... of FEHBP Clauses 1652.204-70 Contractor records retention. As prescribed in 1604.705 the following clause will be inserted in all FEHB Program contracts. Contractor Records Retention (JUL 2005...

  11. 48 CFR 4.102 - Contractor's signature.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor's signature. 4.102 Section 4.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Contract Execution 4.102 Contractor's signature. (a) Individuals. A contract with an...

  12. 48 CFR 253.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications. ...

  13. Diagnosing Causes of Teacher Retention, Mobility and Turnover: Guidelines for TIF Grantees

    Science.gov (United States)

    Finster, Matthew

    2015-01-01

    To effectively address teacher turnover, Teacher Incentive Fund (TIF) grantees need to follow an approach that entails aligning the tracking, diagnosing, and intervening processes. Unfortunately, too often retention strategies are implemented without regard to the various types of teacher turnover and specific data about the causes of turnover.…

  14. 30 CFR 875.20 - Contractor eligibility.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 875.20 Section 875.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION CERTIFICATION AND NONCOAL RECLAMATION § 875.20 Contractor eligibility. Every...

  15. 30 CFR 874.16 - Contractor eligibility.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 874.16 Section 874.16 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.16 Contractor eligibility. To receive...

  16. 7 CFR 3015.183 - Access to contractor records.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Access to contractor records. 3015.183 Section 3015... contractor records. The Attachment 0 requires recipients to include in specified kinds of contracts a provision for access to the contractor's records by the recipient and the Federal government. The following...

  17. Proceeding of the workshop on quantum gravity and topology

    International Nuclear Information System (INIS)

    Oda, Ichiro

    1991-10-01

    The workshop on Quantum Gravity and Topology was held at INS on February 21-23, 1991. Several introductory lectures and more than 15 talks were delivered for about 100 participants. The main subjects discussed were i) Topological quantum field theories and topological gravity ii) Low dimensional and four dimensional gravity iii) Topology change iv) Superstring theories etc. (J.P.N.)

  18. 48 CFR 3052.204-71 - Contractor employee access.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contractor employee access... CLAUSES Text of Provisions and Clauses 3052.204-71 Contractor employee access. As prescribed in (HSAR) 48...: Contractor Employee Access (JUN 2006) (a) “Sensitive Information,” as used in this Chapter, means any...

  19. Determinants of contractor pricing strategy

    OpenAIRE

    Moses, O. Douglas

    1988-01-01

    This paper investigates pricing strategies used by major defense contractors. Two pricing strategies are identified and discussed: penetration, which calls for a relatively low initial price followed by little reduction in price over time, and skimming, which calls for a relatively high initial price coupled with greater reduction in price over time. It is argued that contractor pricing strategy will depend on features of the defense program under consideration and featur...

  20. A practical due diligence strategy for managing the safety of contractors

    International Nuclear Information System (INIS)

    Catton, C.

    1998-01-01

    Ontario Hydro's Fossil Business has developed and implemented a practical program to ensure that the due diligence requirements for contractors are met, particularly in the health and safety area. Companies in the power generation business are hiring contractors to protect their competitive potential by having them perform specialty work outside the core business of generating electricity. The reasons behind this trend, and the need for companies to develop comprehensive contractor safety management systems to avoid legislative liability and cost overruns, and to have contractors work safely, are examined. The main elements of Ontario Hydro's Fossil Business Contractor Safety Management Program (contractor safety policy, contractor safety manual, contractor safety training, and a contractor safety performance database) are discussed. 2 figs., 2 appendices

  1. Nordic Nuclear Materials Forum for Generation IV Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Anghel, C. (Studsvik Nuclear AB, Nykoeping (Sweden)); Penttilae, S. (Technical Research Centre of Finland, VTT (Finland))

    2010-03-15

    A network for material issues for Generation IV nuclear power has been initiated within the Nordic countries. The objectives of the Generation IV Nordic Nuclear Materials Forum (NOMAGE4) are to put the basis of a sustainable forum for Gen IV issues, especially focussing on fuels, cladding, structural materials and coolant interaction. Other issues include reactor physics, dynamics and diagnostics, core and fuel design. The present report summarizes the work performed during the year 2009. The efforts made include identification of organisations involved in Gen IV issues in the Nordic countries, update of the forum website, http://www.studsvik.se/GenerationIV, and investigation of capabilities for research within the area of Gen IV. Within the NOMAGE4 project a seminar on Generation IV Nuclear Energy Systems has been organized during 15-16th of October 2009. The aim of the seminar was to provide a forum for exchange of information, discussion on future research needs and networking of experts on Generation IV reactor concepts. As an outcome of the NOMAGE4, a few collaboration project proposals have been prepared/planned in 2009. The network was welcomed by the European Commission and was mentioned as an exemplary network with representatives from industries, universities, power companies and research institutes. NOMAGE4 has been invited to participate to the 'European Energy Research Alliance, EERA, workshop for nuclear structural materials' http://www.eera-set.eu/index.php?index=41 as external observers. Future plans include a new Nordic application for continuation of NOMAGE4 network. (author)

  2. Nordic Nuclear Materials Forum for Generation IV Reactors

    International Nuclear Information System (INIS)

    Anghel, C.; Penttilae, S.

    2010-03-01

    A network for material issues for Generation IV nuclear power has been initiated within the Nordic countries. The objectives of the Generation IV Nordic Nuclear Materials Forum (NOMAGE4) are to put the basis of a sustainable forum for Gen IV issues, especially focussing on fuels, cladding, structural materials and coolant interaction. Other issues include reactor physics, dynamics and diagnostics, core and fuel design. The present report summarizes the work performed during the year 2009. The efforts made include identification of organisations involved in Gen IV issues in the Nordic countries, update of the forum website, http://www.studsvik.se/GenerationIV, and investigation of capabilities for research within the area of Gen IV. Within the NOMAGE4 project a seminar on Generation IV Nuclear Energy Systems has been organized during 15-16th of October 2009. The aim of the seminar was to provide a forum for exchange of information, discussion on future research needs and networking of experts on Generation IV reactor concepts. As an outcome of the NOMAGE4, a few collaboration project proposals have been prepared/planned in 2009. The network was welcomed by the European Commission and was mentioned as an exemplary network with representatives from industries, universities, power companies and research institutes. NOMAGE4 has been invited to participate to the 'European Energy Research Alliance, EERA, workshop for nuclear structural materials' http://www.eera-set.eu/index.php?index=41 as external observers. Future plans include a new Nordic application for continuation of NOMAGE4 network. (author)

  3. Key drivers for informal project coordination among sub-contractors

    DEFF Research Database (Denmark)

    Aagaard, Annabeth; Eskerod, Pernille; Madsen, Erik Skov

    2015-01-01

    understandings. Still though, many sub-contractors choose not to coordinate informally. The purpose of this paper is to identify drivers that enhance or inhibits informal coordination in projects. A qualitative, explorative case study approach was applied. Fifteen SME sub-contractors within the offshore wind...... are massive. Six drivers which enhance informal coordination and three drivers which inhibit informal coordination among sub-contractors in projects were identified. The findings imply that management in project-oriented organizations can enhance informal coordination across project sub-contractors...... and by facilitating trust building, by emphasizing previous collaboration successes with the sub-contractors and the possibility of future common projects, by being explicit about expectations on informal coordination, and by developing sub-contractor contracts that are not as tight in economic terms, but instead...

  4. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Science.gov (United States)

    2010-10-01

    ... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor... instructions in NASA Procedures and Guidelines (NPR) 9501.2, NASA Contractor Financial Management Reporting...

  5. 78 FR 46783 - Federal Acquisition Regulation; Documenting Contractor Performance

    Science.gov (United States)

    2013-08-01

    ..., Sequence 1] RIN 9000-AM09 Federal Acquisition Regulation; Documenting Contractor Performance AGENCY... the Contractor Performance Assessment Reporting System (CPARS), the single Governmentwide past... Procurement Policy (OFPP) memorandum entitled ``Improving the Use of Contractor Performance Information...

  6. Private Security Contractors in Darfur

    DEFF Research Database (Denmark)

    Leander, Anna

    2006-01-01

    This article argues that the role of Private Security Contractors in Darfur reflects and reinforces neo-liberal governmentality in contemporary security governance. It is an argument (in line with other articles in this special issue) which is more interested in discussing how the privatization....... It underlines that governance is increasingly taking place through a set of (quasi-) markets, it is marked by entrepreneurial values, and a hands off approach to governance. We then discuss the way this overall change is reflected in and reinforced by the role of private security contractors in Darfur. Drawing...... at these processes is necessary to understand the role of private security contractors in Darfur. But more than this, practices in Darfur entrench neo-liberal governmentality in security more generally. The managerial and `de-politicizing' approach to security in Darfur displaces alternative views not only...

  7. 76 FR 37704 - Federal Acquisition Regulation; Documenting Contractor Performance

    Science.gov (United States)

    2011-06-28

    ... Federal Acquisition Regulation; Documenting Contractor Performance AGENCY: Department of Defense (DoD..., and to require all past performance information be entered into the Contractor Performance Assessment... Contractor Performance Information. These changes provide Governmentwide standardized evaluation factors and...

  8. Financial management of construction contractors.

    OpenAIRE

    Lacaria, Chris J.

    1994-01-01

    The scope of this paper is to discuss the financial management of a construction contractor. This paper attempts to approach this subject in a logical and systematic way. It communicates the importance of financial analysis and planning along with cash planning and profit planning. This report is not intended to be an all inclusive discussion of financial management in construction. Contractor's Financial Management is an extremely important subject. It has been told ...

  9. Technology transfer - insider protection workshop (Safeguards Evaluation Method - Insider Threat)

    International Nuclear Information System (INIS)

    Strait, R.S.; Renis, T.A.

    1986-01-01

    The Safeguards Evaluation Method - Insider Threat, developed by Lawrence Livermore National Laboratory, is a field-applicable tool to evaluate facility safeguards against theft or diversion of special nuclear material (SNM) by nonviolent insiders. To ensure successful transfer of this technology from the laboratory to DOE field offices and contractors, LLNL developed a three-part package. The package includes a workbook, user-friendly microcomputer software, and a three-day training program. The workbook guides an evaluation team through the Safeguards Evaluation Method and provides forms for gathering data. The microcomputer software assists in the evaluation of safeguards effectiveness. The software is designed for safeguards analysts with no previous computer experience. It runs on an IBM Personal Computer or any compatible machine. The three-day training program is called the Insider Protection Workshop. The workshop students learn how to use the workbook and the computer software to assess insider vulnerabilities and to evaluate the benefits and costs of potential improvements. These activities increase the students' appreciation of the insider threat. The workshop format is informal and interactive, employing four different instruction modes: classroom presentations, small-group sessions, a practical exercise, and ''hands-on'' analysis using microcomputers. This approach to technology transfer has been successful: over 100 safeguards planners and analysts have been trained in the method, and it is being used at facilities through the DOE complex

  10. A guide for heating contractor; Opas laempoeyrittaejaelle

    Energy Technology Data Exchange (ETDEWEB)

    Solmio, H; Tuomi, S; Valkonen, J

    1996-12-31

    Heating contractor is eg. a forest owner, who is responsible for the heating of a commune owned school using firewood purchased from the contractor`s own forests. This is a new alternative for entrepreneurship in the countryside. This guide has been meant as an aid for persons starting heating contraction. It is supposed to be of importance for the designers of the communal energy supply, for advisors and instructors, as well as for those already started the heating contraction. The guide discusses the following topics: Why to became a heating contractor; The ways of heating contraction; operational requirements; Contracts; Conversion of a boiler plant to wood fuels; Fuel purchase; Heating work; Profitably estimation; Examples of operational solutions. The guide also includes as an example a draft contract for heating contraction

  11. National Radon Contractor Proficiency Program. Proficiency report, October 1990

    International Nuclear Information System (INIS)

    1990-10-01

    The report lists those individual contractors in the United States who have met the requirements of the Radon Contractor Proficiency (RCP) Program as of August 18, 1990. These requirements are designed to provide minimum proficiency criteria for individuals who design and supervise the installation of radon mitigation systems in buildings. (Some States have more stringent requirements as part of their radon certification programs. The States should be consulted directly for details on their programs; see Section 5 for a list of State radon contacts). The RCP Program measures the proficiency of an individual contractor, not their company. Therefore, users of the report who select a mitigation firm should ensure that the services are provided by the listed contractor. The National RCP Program does not accredit mitigation contractors, nor does it certify, recommend, or endorse participating companies. Only the listed contractor, not their company of affilation, are deemed proficient. The inclusion of a contractor in the report should not be interpreted as a certification or accreditation of the individual or affiliated company

  12. Assuring the competence of nuclear power plant contractor personnel

    International Nuclear Information System (INIS)

    2001-07-01

    This report was prepared in response to a recommendation by the IAEA International Working Group on Training and Qualification of NPP Personnel (JWG-T and Q) and supported by a number of IAEA meetings on NPP personnel training. IAEA publications on NPP training are the only international documents available to all Member States with nuclear programmes. This report complements the following IAEA publications on NPP personnel training: Technical Reports Series No. 380, Nuclear Power Plant Personnel Training and its Evaluation, A Guidebook; IAEA-TECDOC-1057, Experience in the Use of Systematic Approach to Training (SAT) for Nuclear Power Plant Personnel and IAEA-TECDOC-1063, IAEA World Survey on Nuclear Power Plant Personnel Training. This TECDOC also supplements the IAEA Safety Guide 50-SG-O1 (Rev. 1), Staffing of Nuclear Power Plants and the Recruitment Training and Authorization of Operating Personnel and Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants. Operation. Within the context of this report NPP contractors are defined as any personnel working for a nuclear power plant who are not directly employed by the nuclear power plant. Competence is the ability to perform to identified standards; it comprises skills, knowledge and attitudes and may be developed through education, experience and training. Qualification is a formal statement of achievement, resulting from an auditable assessment; if competence is assessed, the qualification becomes a formal statement of competence and may be shown on a certificate, diploma, etc. It is recognized that personnel are used to perform tasks that are of a specialised or temporary nature where it is not feasible to hire or maintain a full-time NPP employee. Accordingly, contractors may be used in a variety of situations to support NPPs. Typical situations include: supplies and services being delivered by the contractors that are subject to different quality standards based on a graded approach to assuring

  13. Assuring the competence of nuclear power plant contractor personnel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This report was prepared in response to a recommendation by the IAEA International Working Group on Training and Qualification of NPP Personnel (JWG-T and Q) and supported by a number of IAEA meetings on NPP personnel training. IAEA publications on NPP training are the only international documents available to all Member States with nuclear programmes. This report complements the following IAEA publications on NPP personnel training: Technical Reports Series No. 380, Nuclear Power Plant Personnel Training and its Evaluation, A Guidebook; IAEA-TECDOC-1057, Experience in the Use of Systematic Approach to Training (SAT) for Nuclear Power Plant Personnel and IAEA-TECDOC-1063, IAEA World Survey on Nuclear Power Plant Personnel Training. This TECDOC also supplements the IAEA Safety Guide 50-SG-O1 (Rev. 1), Staffing of Nuclear Power Plants and the Recruitment Training and Authorization of Operating Personnel and Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants. Operation. Within the context of this report NPP contractors are defined as any personnel working for a nuclear power plant who are not directly employed by the nuclear power plant. Competence is the ability to perform to identified standards; it comprises skills, knowledge and attitudes and may be developed through education, experience and training. Qualification is a formal statement of achievement, resulting from an auditable assessment; if competence is assessed, the qualification becomes a formal statement of competence and may be shown on a certificate, diploma, etc. It is recognized that personnel are used to perform tasks that are of a specialised or temporary nature where it is not feasible to hire or maintain a full-time NPP employee. Accordingly, contractors may be used in a variety of situations to support NPPs. Typical situations include: supplies and services being delivered by the contractors that are subject to different quality standards based on a graded approach to assuring

  14. Development and Implementation Costs of Student Learning Objectives: Considerations for TIF Grantees

    Science.gov (United States)

    Fermanich, Mark; Carl, Brad; Finster, Matthew

    2015-01-01

    This brief explores the costs of developing and implementing Student Learning Objectives (SLOs) in order to help Teacher Incentive Fund (TIF) grantees interested in adopting SLOs anticipate and understand the costs of implementing them in a district or school. The brief focuses on the costs involved with the initial design and implementation of an…

  15. Modelling Client Satisfaction Levels: The Impact of Contractor Performance

    Directory of Open Access Journals (Sweden)

    Robby Soetanto

    2012-11-01

    Full Text Available The performance of contractors is known to be a key determinant of client satisfaction.Here, using factor analysis, clients’ satisfaction is defined in several dimensions. Based onclients’ assessment of contractor performance, a number of satisfaction models developedusing the multiple regression (MR technique are presented. The models identify arange of variables encompassing contractor performance, project performance and respondent(i.e. client attributes as useful predictors of satisfaction levels. Contractor performanceattributes were found to be of utmost importance indicating that clientsatisfaction levels are mainly dependent on the performance of the contractor. Furthermore,findings suggest that subjectivity is to some extent prevalent in clients’ performanceassessment. The models demonstrate accurate and reliable predictive power as confirmedby validation tests. Contractors could use the models to help improve their performanceleading to more satisfied clients. This would also promote the development ofharmonious working relationships within the construction project coalition.

  16. 34 CFR 377.30 - What information must a grantee maintain and provide to the Secretary?

    Science.gov (United States)

    2010-07-01

    ... DEMONSTRATION PROJECTS TO INCREASE CLIENT CHOICE PROGRAM What Post-Award Conditions Must Be Met by a Grantee... maintain the records that the Secretary requires to conduct an evaluation of projects funded under this...

  17. 77 FR 6676 - Office of Inspector General; Contractor Requirements

    Science.gov (United States)

    2012-02-09

    ... POSTAL SERVICE 39 CFR Part 230 Office of Inspector General; Contractor Requirements AGENCY: Postal... for contractors employed by the Office of Inspector General. The rule also emphasizes consistency in contractor selection, and clarifies the OIG's exclusive authority to set qualifications and standards for its...

  18. 48 CFR 970.0407 - Contractor records retention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor records retention. 970.0407 Section 970.0407 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0407 Contractor...

  19. 48 CFR 227.7108 - Contractor data repositories.

    Science.gov (United States)

    2010-10-01

    ... repositories. 227.7108 Section 227.7108 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Technical Data 227.7108 Contractor data repositories. (a) Contractor data repositories may be established when permitted by agency procedures. The contractual instrument establishing the data repository must...

  20. 77 FR 12754 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2012-03-02

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... rulemaking (NOPR) to revise existing regulations covering contractor legal management requirements and make... relating to the DOE notice of proposed rulemaking to revise existing regulations covering contractor legal...

  1. 48 CFR 1252.237-70 - Qualifications of contractor employees.

    Science.gov (United States)

    2010-10-01

    ... contractor employees. 1252.237-70 Section 1252.237-70 Federal Acquisition Regulations System DEPARTMENT OF....237-70 Qualifications of contractor employees. As prescribed in (TAR) 48 CFR 1237.110(a), insert the following clause: Qualifications of Contractor Employees (APR 2005) a. Definitions. As used in this clause...

  2. 48 CFR 2452.237-75 - Clearance of contractor personnel.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Clearance of contractor... Clauses 2452.237-75 Clearance of contractor personnel. As prescribed in 2437.110(e), insert the following clause in solicitations and contracts. Clearance of Contractor Personnel (OCT 1999) (a) General. This...

  3. 76 FR 81408 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2011-12-28

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... Energy (DOE or Department) is proposing to revise existing regulations covering contractor legal... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  4. 78 FR 25795 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2013-05-03

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952, and 970 RIN 1990-AA37 Contractor Legal.... ACTION: Final rule. SUMMARY: The Department of Energy revises existing regulations covering contractor... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  5. 48 CFR 52.236-6 - Superintendence by the Contractor.

    Science.gov (United States)

    2010-10-01

    ... Contractor. 52.236-6 Section 52.236-6 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION....236-6 Superintendence by the Contractor. As prescribed in 36.506, insert the following clause: Superintendence by the Contractor (APR 1984) At all times during performance of this contract and until the work...

  6. Report on the CSNI workshop on nuclear power plant transition from operation into decommissioning: human factors and organisation considerations

    International Nuclear Information System (INIS)

    2000-01-01

    The Senior Expert Group of the Committee on the Safety of Nuclear Installations (CSNI) proposed to Principal Working Group 1 (PWG1) of CSNI that a workshop be held to identify and discuss issues related to the impact of human factors and organisational aspects on decommissioning. This workshop was held in May 1999 in conjunction with the Joint NEA/IAEA/EC workshop on The Regulatory Aspects of Decommissioning. The workshop goals, as stated in the NEA Research Strategies for Human Performance, were 'to convene an information exchange meeting with interested Member countries in order to discuss areas of concern in this respect and identify possible areas that merit further research and their priorities'. The workshop highlighted a comparative lack of developed work in this area concerning the way in which organisational weaknesses can manifest themselves and how best to prevent or mitigate their effects. Eight key issues were identified and discussed by the participants. For each of the eight issues discussed by working groups, the potential risks of failing to address the Issue were identified. These potential risks formed a focal point for generating discussion about current experience and for drawing out gaps in current knowledge and understanding. From this base, participants then focused on specific types of information and questions that need further research in order to improve understanding and successful implementation of the transition from operations to decommissioning. The eight issues and suggested high priority needs are: - Creating a system to share international experience: Establish improved methods for obtaining and sharing information and experience on a regular basis in order to identify organisational and human factors issues, good practices and lessons learned as regulators and utilities deal with decommissioning. - Organisational memory and competence: Identify effective approaches to retain expertise during the transition from operations to

  7. 76 FR 31416 - Federal Acquisition Regulation; Oversight of Contractor Ethics Programs

    Science.gov (United States)

    2011-05-31

    ...-AL92 Federal Acquisition Regulation; Oversight of Contractor Ethics Programs AGENCY: Department of... that contractors have implemented the mandatory contractor business ethics program requirements. DATES... to Improve DoD's Oversight of Contractor Ethics Programs. The ethics program requirement flows from...

  8. 48 CFR 1437.7001 - Contractor qualification requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor qualification requirements. 1437.7001 Section 1437.7001 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... Contractor qualification requirements. (a) Prior to award of a contract for real property appraisal services...

  9. Advantages of the production contractor concept

    Energy Technology Data Exchange (ETDEWEB)

    Gisvold, K.M. [Golar-Nor Offshore, Trondheim (Norway)

    1994-12-31

    This paper presents some thoughts on the Production Contractor concept. It starts with an attempt to define the prerequisites for such contractorship to exist and develop, going on to examine the considerations that the oil company and the contractor respectively have to go through, and finally trying to summarize what emerges as the advantages of production contracting. Examples are given to emphasize particular points

  10. Advantages of the production contractor concept

    International Nuclear Information System (INIS)

    Gisvold, K.M.

    1994-01-01

    This paper presents some thoughts on the Production Contractor concept. It starts with an attempt to define the prerequisites for such contractorship to exist and develop, going on to examine the considerations that the oil company and the contractor respectively have to go through, and finally trying to summarize what emerges as the advantages of production contracting. Examples are given to emphasize particular points

  11. 14 CFR 1274.402 - Contractor acquired property.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Contractor acquired property. 1274.402 Section 1274.402 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Property § 1274.402 Contractor acquired property. As provided in § 1274.923...

  12. 48 CFR 1646.301 - Contractor inspection requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor inspection requirements. 1646.301 Section 1646.301 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Clauses 1646.301 Contractor inspection requirements. The clause set forth at 1652.246-70 shall be inserted...

  13. 48 CFR 645.608 - Screening of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... inventory. 645.608 Section 645.608 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 645.608 Screening of contractor inventory. ...

  14. Contractors on the Battlefield: Planning Considerations and Requirements

    National Research Council Canada - National Science Library

    2002-01-01

    Contractors on the Battlefield: Planning Considerations and Requirements introduces the basics and foundation for those who want to learn about the history, terminology, and process for obtaining contractor support on the battlefield...

  15. Rapporteur's Report of the Workshop on Radiological Characterisation for Decommissioning

    International Nuclear Information System (INIS)

    Thierfeldt, Stefan

    2012-01-01

    In April 2012, the Nuclear Energy Agency, in co-operation with Studsvik Nuclear AB, the Swedish Radiation Safety Authority (SSM), Swedish Nuclear Fuel and Waste Management Company (SKB) and AB SVAFO, held a Workshop on Radiological Characterisation in Decommissioning in Studsvik near Nykoeping (Sweden). During three days, a wide range of presentations, posters, discussions and site visits brought together over 120 participants from 23 countries and 4 international organisations, the IAEA, the WNA, the European Commission and the OECD/NEA. Members of the Task Group on Radiological Characterisation for Decommissioning (RCD) of the WPDD were involved in the preparation of the workshop. Many decommissioning projects of all types of nuclear installations have progressed substantially and/or have been completed to brown field or green field conditions, so that it was the right time to bring together operators, regulators, scientists, consultants and contractors to exchange information and views and to evaluate the information on radiological characterisation gained from this multitude of projects. The outcome will be valuable for the large number of decommissioning projects about to start in the near future. The Workshop consisted of 5 topical sessions and a poster session. The topical sessions were complemented by discussions in the plenary and in smaller groups. This report provides a short summary of the various presentations and discussions. It concentrates on the outcome of the presentations, posters and discussions than giving an account of the spoken word

  16. 78 FR 1256 - Guam Military Base Realignment Contractor Recruitment Standards

    Science.gov (United States)

    2013-01-08

    ... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Final notice... issuing this notice to announce recruitment standards that construction contractors are required to follow... B) by adding a new subsection (6). This provision prohibits contractors engaged in construction...

  17. 77 FR 3503 - Guam Military Base Realignment Contractor Recruitment Standards

    Science.gov (United States)

    2012-01-24

    ... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Notice... issuing this notice to announce the recruitment standards that construction contractors are required to... contractors engaged in construction projects related to the realignment of U.S. military forces from Okinawa...

  18. Accounting calculations problems with suppliers and contractors

    Directory of Open Access Journals (Sweden)

    Tikholaz I.A.

    2016-12-01

    Full Text Available in the article an order of accounting reflection of payments with suppliers and contractors are researched and ways of enhancement of accounting calculations process development with the purpose of management decisions optimization for their implementation are offered. Theoretical bases of intraeconomic control of settlings with suppliers and contractors are developed.

  19. National Radon Contractor Proficiency (RCP) Program. Proficiency report, June 1991

    International Nuclear Information System (INIS)

    1991-06-01

    The primary objective of the U.S. Environmental Protection Agency's (EPA) efforts to address the indoor radon problem is to reduce radon levels in buildings throughout the country. Achieving the objective requires a nationwide supply of capable radon mitigation contractors. In the Indoor Radon Abatement Act of 1988, Congress authorized EPA to establish a program to evaluate radon mitigation contractors and to provide the information to the public in cooperation with the States. The Radon Contractor Proficiency (RCP) Program was developed to assist States, EPA Regions, local government officials, and the public in selecting contractors who have demonstrated their proficiency in reducing indoor radon levels. The program is managed by the EPA Office of Radiation Programs' Radon Division. Under the voluntary program, radon contractors demonstrate their proficiency by meeting specific Program requirements. Individual contractors who meet these requirements are then listed in periodic RCP Proficiency Reports

  20. National Radon Contractor Proficiency (RCP) program. Proficiency report, September 1991

    International Nuclear Information System (INIS)

    1991-09-01

    The primary objective of the U.S. Environmental Protection Agency's (EPA) efforts to address the indoor radon problem is to reduce radon levels in buildings throughout the country. Achieving this objective requires a nationwide supply of capable radon mitigation contractors. In the Indoor Radon Abatement Act of 1988, Congress authorized EPA to establish a program to evaluate radon mitigation contractors and to provide this information to the public in cooperation with the States. The Radon Contractor Proficiency (RCP) Program was developed to assist States, EPA Regions, local government officials, and the public in selecting contractors who have demonstrated their proficiency in reducing indoor radon levels. The program is managed by the EPA Office of Radiation Programs' Radon Division. Under this voluntary program, radon contractors demonstrate their proficiency by meeting specific Program requirements. Individual contractors who meet these requirements are then listed in the Report

  1. National Radon Contractor Proficiency (RCP) Program. Proficiency report, January 1992

    International Nuclear Information System (INIS)

    1992-01-01

    The primary objective of the U.S. Environmental Protection Agency's (EPA) efforts to address the indoor radon problem is to reduce radon levels in buildings throughout the country. Achieving the objective requires a nationwide supply of capable radon mitigation contractors. In the Indoor Radon Abatement Act of 1988, Congress authorized EPA to establish a program to evaluate radon mitigation contractors and to provide the information to the public in cooperation with the States. The Radon Contractor Proficiency (RCP) Program was developed to assist States, EPA Regions, local government officials, and the public in selecting contractors who have demonstrated their proficiency in reducing indoor radon levels. The program is managed by the EPA Office of Radiation Programs' Radon Division. Under the voluntary program, radon contractors demonstrate their proficiency by meeting specific Program requirements. Individual contractors who meet these requirements are then listed in the Report

  2. 48 CFR 1403.570 - Restrictions on contractor advertising.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Restrictions on contractor advertising. 1403.570 Section 1403.570 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... 1403.570 Restrictions on contractor advertising. ...

  3. 76 FR 48776 - Federal Acquisition Regulation; Documenting Contractor Performance; Correction

    Science.gov (United States)

    2011-08-09

    ... Regulation; Documenting Contractor Performance; Correction AGENCY: Department of Defense (DoD), General... published in the Federal Register of June 28, 2011, regarding the proposed rule for Documenting Contractor... published in the Federal Register of June 28, 2011, regarding the proposed rule for Documenting Contractor...

  4. 42 CFR 405.874 - Appeals of CMS or a CMS contractor.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Appeals of CMS or a CMS contractor. 405.874 Section... Part B Program § 405.874 Appeals of CMS or a CMS contractor. A CMS contractor's (that is, a carrier... supplier enrollment application. If CMS or a CMS contractor denies a provider's or supplier's enrollment...

  5. 48 CFR 2804.470 - Contractor Personnel Security Program.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Personnel Security Program. 2804.470 Section 2804.470 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE General ADMINISTRATIVE MATTERS Safeguarding Classified Information Within Industry 2804.470 Contractor...

  6. 13 CFR 143.12 - Special grant or subgrant conditions for “high-risk” grantees.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Special grant or subgrant conditions for âhigh-riskâ grantees. 143.12 Section 143.12 Business Credit and Assistance SMALL BUSINESS... or subgrantee: (1) Has a history of unsatisfactory performance, or (2) Is not financially stable, or...

  7. 28 CFR 90.106 - What are the grantee reporting requirements for the grant program?

    Science.gov (United States)

    2010-07-01

    ..., Violence Against Women Office) and the Secretary of Education (U.S. Department of Education's Safe and Drug... (CONTINUED) VIOLENCE AGAINST WOMEN Grants To Combat Violent Crimes Against Women on Campuses § 90.106 What..., Violence Against Women Office). Funding shall be suspended if a grantee fails to submit an annual...

  8. 29 CFR 500.60 - Farm labor contractors' recruitment, contractual and general obligations.

    Science.gov (United States)

    2010-07-01

    ... labor contractors' recruitment, contractual and general obligations. The Act imposes certain specific recruitment, contractual and general obligations on farm labor contractors and farm labor contractor employees... 29 Labor 3 2010-07-01 2010-07-01 false Farm labor contractors' recruitment, contractual and...

  9. Introduction to The neurosciences and music IV: learning and memory.

    Science.gov (United States)

    Altenmüller, E; Demorest, S M; Fujioka, T; Halpern, A R; Hannon, E E; Loui, P; Majno, M; Oechslin, M S; Osborne, N; Overy, K; Palmer, C; Peretz, I; Pfordresher, P Q; Särkämö, T; Wan, C Y; Zatorre, R J

    2012-04-01

    The conference entitled "The Neurosciences and Music-IV: Learning and Memory'' was held at the University of Edinburgh from June 9-12, 2011, jointly hosted by the Mariani Foundation and the Institute for Music in Human and Social Development, and involving nearly 500 international delegates. Two opening workshops, three large and vibrant poster sessions, and nine invited symposia introduced a diverse range of recent research findings and discussed current research directions. Here, the proceedings are introduced by the workshop and symposia leaders on topics including working with children, rhythm perception, language processing, cultural learning, memory, musical imagery, neural plasticity, stroke rehabilitation, autism, and amusia. The rich diversity of the interdisciplinary research presented suggests that the future of music neuroscience looks both exciting and promising, and that important implications for music rehabilitation and therapy are being discovered. © 2012 New York Academy of Sciences.

  10. Selection and assessment of contractors; Auswahl und Beurteilung von Auftragnehmerfirmen

    Energy Technology Data Exchange (ETDEWEB)

    Lier, K.H. [ExxonMobil Production Deutschland GmbH, Hannover (Germany)

    2007-09-13

    Reliable and efficient contractors are important for the activities of ExxonMobil. Qualification of contractors is to ensure that contractors provide technical services in accordance with the specifications of ExxonMobil. Apart from the financial, oranisational and legal qualification this covers technical qualification, i.e. industrial safety, health protection and environmental protection, as well as technical efficiency and quality. The ultimate intention is to find out if contractors have the processes and systems at their disposal that are required for the services. The qualification process is described. (orig.)

  11. Information technology boosts contractor's economic success

    International Nuclear Information System (INIS)

    Penny, M.; Vasey, G.M.

    1995-01-01

    This article will discuss the advantages of Information Technology (IT) and how one drilling contractor, Global Marine, has applied this technology. The company has applied it in an efficient manner which has provided business benefits and cost reductions that have helped its operations be more successful. The following are the different aspects of information technology that led to the contractor's success: cost reduction measures; migration to a client/server IT infrastructure; IT business benefits; and keys to obtaining business benefits from IT

  12. Proceedings of the Department of Energy Defense Programs hazardous and mixed waste minimization workshop: Hazardous Waste Remedial Actions Program

    International Nuclear Information System (INIS)

    1988-09-01

    The first workshop on hazardous and mixed waste minimization was held in Las Vegas, Nevada, on July 26--28, 1988. The objective of this workshop was to establish an interchange between DOE headquarters (DOE-HQ) DP, Operations Offices, and contractors of waste minimization strategies and successes. The first day of the workshop began with presentations stressing the importance of establishing a waste minimization program at each site as required by RCRA, the land ban restrictions, and the decrease in potential liabilities associated with waste disposal. Discussions were also centered on pending legislation which would create an Office of Waste Reduction in the Environmental Protection Agency (EPA). The Waste Minimization and Avoidance Study was initiated by DOE as an addition to the long-term productivity study to address the issues of evolving requirements facing RCRA waste management activities at the DP sites, to determine how major operations will be affected by these requirements, and to determine the available strategies and options for waste minimization and avoidance. Waste minimization was defined in this study as source reduction and recycling

  13. Contractor Selection for Enhancing the Quality of University ...

    African Journals Online (AJOL)

    Contractor Selection for Enhancing the Quality of University Education in Nigeria using the Hamming Distance. DEA Omorogbe, SO Aibieyi. Abstract. The need for contractor selection in our university education system cannot be over emphasized. And applying scientific techniques for appropriateness and accuracy in the ...

  14. 48 CFR 36.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Evaluation of contractor performance. 36.201 Section 36.201 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Contracting for Construction 36.201 Evaluation of contractor performance. See 42.1502(e) for the requirements...

  15. 48 CFR 49.405 - Completion by another contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Completion by another contractor. 49.405 Section 49.405 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... contractor. If the surety does not arrange for completion of the contract, the contracting officer normally...

  16. Fiscal Liability of State Contractors

    Directory of Open Access Journals (Sweden)

    Santiago Fajardo-Peña

    2017-06-01

    Full Text Available The State contract is one of the most important tools for public management. The formation, execution and liquidation of State contracts are also a potential cause of State patrimonial damages. Perhaps for this reason, many State contractors are prosecuted as if they were public spending managers. The question, however, is not as simple. The fiscal liability process has a qualified recipient: the fiscal manager. In this article, through a conceptual exposition and a case study, we identify the criterion for determining in which cases a State contractor acquires the function of controlling public funds and when he/she can be subjected to a fiscal liability.

  17. FY 2000 Saltcake Dissolution and Feed Stability Workshop

    International Nuclear Information System (INIS)

    Hunt, R.D.; McGinnis, C.P.; Weber, C.F.; Welch, T.D.; Jewett, J.R.

    2000-01-01

    The Tanks Focus Area (TFA) continues to work closely with the Office of River Protection (ORP) to better understand the chemistry involved with the retrieval, transport, and pretreatment of nuclear wastes at Hanford. Since a private contractor is currently responsible for the pretreatment and immobilization activities in this remediation effort, the TFA has concentrated on saltcake dissolution and waste transport at the request of the ORP. Researchers at Hanford have performed a series of dissolution experiments on actual saltcake samples. Staff members at Mississippi State University (MSU) continue to model the dissolution results with the Environmental Simulation Program (ESP), which is used extensively by ORP personnel. Several ways to improve the predictive capabilities of the ESP were identified. Since several transfer lines at Hanford have become plugged, TFA tasks at AEA Technologies, Florida International University (FIU), MSU, and Oak Ridge National Laboratory (ORNL) are investigating the behavior of the supernatants and slurries during transport. A combination of experimental and theoretical techniques is used to study the transport chemistry. This effort is expected to develop process control tools for waste transfer. The results from these TFA tasks were presented to ORP personnel during the FY 2000 Saltcake Dissolution and Feed Stability Workshop, which was held on May 16-17 in Richland, Washington. The minutes from this workshop are provided in this report

  18. 77 FR 43078 - Federal Acquisition Regulation; Information Collection; Central Contractor Registration

    Science.gov (United States)

    2012-07-23

    ...; Information Collection; Central Contractor Registration AGENCY: Department of Defense (DOD), General Services... requirement concerning the Central Contractor Registration database. Public comments are particularly invited... Information Collection 9000- 0159, Central Contractor Registration, by any of the following methods...

  19. 78 FR 12316 - Federal Acquisition Regulation; Information Collection; Central Contractor Registration

    Science.gov (United States)

    2013-02-22

    ...; Information Collection; Central Contractor Registration AGENCIES: Department of Defense (DOD), General... collection requirement concerning the Central Contractor Registration database. A notice was published in the... Information Collection 9000- 0159, Central Contractor Registration, by any of the following methods...

  20. Summary from the epistemic uncertainty workshop: consensus amid diversity

    International Nuclear Information System (INIS)

    Ferson, Scott; Joslyn, Cliff A.; Helton, Jon C.; Oberkampf, William L.; Sentz, Kari

    2004-01-01

    The 'Epistemic Uncertainty Workshop' sponsored by Sandia National Laboratories was held in Albuquerque, New Mexico, on 6-7 August 2002. The workshop was organized around a set of Challenge Problems involving both epistemic and aleatory uncertainty that the workshop participants were invited to solve and discuss. This concluding article in a special issue of Reliability Engineering and System Safety based on the workshop discusses the intent of the Challenge Problems, summarizes some discussions from the workshop, and provides a technical comparison among the papers in this special issue. The Challenge Problems were computationally simple models that were intended as vehicles for the illustration and comparison of conceptual and numerical techniques for use in analyses that involve: (i) epistemic uncertainty, (ii) aggregation of multiple characterizations of epistemic uncertainty, (iii) combination of epistemic and aleatory uncertainty, and (iv) models with repeated parameters. There was considerable diversity of opinion at the workshop about both methods and fundamental issues, and yet substantial consensus about what the answers to the problems were, and even about how each of the four issues should be addressed. Among the technical approaches advanced were probability theory, Dempster-Shafer evidence theory, random sets, sets of probability measures, imprecise coherent probabilities, coherent lower previsions, probability boxes, possibility theory, fuzzy sets, joint distribution tableaux, polynomial chaos expansions, and info-gap models. Although some participants maintained that a purely probabilistic approach is fully capable of accounting for all forms of uncertainty, most agreed that the treatment of epistemic uncertainty introduces important considerations and that the issues underlying the Challenge Problems are legitimate and significant. Topics identified as meriting additional research include elicitation of uncertainty representations, aggregation of

  1. 20 CFR 641.540 - What types of training may grantees/subgrantees provide to SCSEP participants?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What types of training may grantees/subgrantees provide to SCSEP participants? 641.540 Section 641.540 Employees' Benefits EMPLOYMENT AND TRAINING... prevents or limits participants from engaging in self-development training available through other sources...

  2. 78 FR 46999 - Additional Waivers and Alternative Requirements for Hurricane Sandy Grantees in Receipt of...

    Science.gov (United States)

    2013-08-02

    ... Speech-impaired individuals may access this number through TTY by calling the toll-free Federal Relay...-401-2044. (Except for the ``800'' number, these telephone numbers are not toll-free.) Email inquiries... the cost of living, including home values) in these entitlement grantees are significantly higher than...

  3. 78 FR 20087 - Privacy Act of 1974; Proposed New System of Records

    Science.gov (United States)

    2013-04-03

    ... information (for market agencies selling on commission), bond information, and information registered entities... Archives and Records Administration; contractors, grantees, experts, consultants, or volunteers; and/or... individuals that are regulated under the P&S Act, which include stockyard owners, market agencies, dealers...

  4. World Workshop on Oral Medicine VI : a systematic review of medication-induced salivary gland dysfunction

    NARCIS (Netherlands)

    Villa, Alessandro; Wolff, A.; Narayana, N.; Dawes, C.; Aframian, D. J.; Pedersen, A. M. Lynge; Vissink, A.; Aliko, A.; Sia, Y. W.; Joshi, R. K.; McGowan, R.; Jensen, S. B.; Kerr, A. R.; Ekstrom, J.; Proctor, G.

    The aim of this paper was to perform a systematic review of the pathogenesis of medication-induced salivary gland dysfunction (MISGD). Review of the identified papers was based on the standards regarding the methodology for systematic reviews set forth by the World Workshop on Oral Medicine IV and

  5. Configuration Management Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    WEIR, W.R.

    2000-01-01

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments

  6. Configuration Management Plan for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  7. Optimal Contractor Selection in Construction Industry: The Fuzzy Way

    Science.gov (United States)

    Krishna Rao, M. V.; Kumar, V. S. S.; Rathish Kumar, P.

    2018-02-01

    A purely price-based approach to contractor selection has been identified as the root cause for many serious project delivery problems. Therefore, the capability of the contractor to execute the project should be evaluated using a multiple set of selection criteria including reputation, past performance, performance potential, financial soundness and other project specific criteria. An industry-wide questionnaire survey was conducted with the objective of identifying the important criteria for adoption in the selection process. In this work, a fuzzy set based model was developed for contractor prequalification/evaluation, by using effective criteria obtained from the percept of construction professionals, taking subjective judgments of decision makers also into consideration. A case study consisting of four alternatives (contractors in the present case) solicited from a public works department of Pondicherry in India, is used to illustrate the effectiveness of the proposed approach. The final selection of contractor is made based on the integrated score or Overall Evaluation Score of the decision alternative in prequalification as well as bid evaluation stages.

  8. 21 CFR 1403.12 - Special grant or subgrant conditions for “high-risk” grantees.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Special grant or subgrant conditions for âhigh-riskâ grantees. 1403.12 Section 1403.12 Food and Drugs OFFICE OF NATIONAL DRUG CONTROL POLICY UNIFORM...) Has a history of unsatisfactory performance, or (2) Is not financially stable, or (3) Has a management...

  9. First year evaluation of EPA's radon contractor proficiency (RCP) program

    International Nuclear Information System (INIS)

    Salmon, G.L.

    1990-01-01

    This paper reports that the Environmental Protection Agency (EPA) has developed a voluntary program to evaluate radon reduction contractors and provide this information to the public, as part of activities mandated by the Indoor Radon Abatement Act (IRAA) of 1988. The Radon Contractor Proficiency Program consists of several elements that collectively help to ensure the proficiency of radon mitigators and give the public greater confidence in their capability. Contractors who participate in the program must pass a written examination, adhere to mitigation guidelines, keep records of work, meet continuing education requirements and pass a re-examination every two years. Upon meeting the program's requirements, mitigators are listed in EPA's National RCP Proficiency Report. The first Report released on May 15, 1990 listed 636 contractors. The second Report, to be release in August, will list 895 contractors, representing an increase of 40 per cent

  10. Operator and contractor benefit from incentive contracts

    International Nuclear Information System (INIS)

    Brandon, B.

    1991-01-01

    This book reports that with incentive contracts, drilling and service contractors assume greater responsibility for operations. That helps them to align their goals more closely with those of the operator. This achieves a more equitable division of the risks. Many operators and contractors believe this is a more appropriate approach to contracting drilling services. As they assume manageable responsibility, each party also has opportunities for greater reward. Innovations in cooperation can create a win-win situation. In a win-win contract all parties benefit from the new relationships between operator, contractor, and service company. The win-win situation can only be achieved by allowing the contracting parties to become much more closely involved in drilling operations. This is the primary motivation behind development of more productive contracting strategies

  11. STREAM2016: Streaming Requirements, Experience, Applications and Middleware Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Fox, Geoffrey [Indiana Univ., Bloomington, IN (United States); Jha, Shantenu [Rutgers Univ., New Brunswick, NJ (United States); Ramakrishnan, Lavanya [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-10-01

    The Department of Energy (DOE) Office of Science (SC) facilities including accelerators, light sources and neutron sources and sensors that study, the environment, and the atmosphere, are producing streaming data that needs to be analyzed for next-generation scientific discoveries. There has been an explosion of new research and technologies for stream analytics arising from the academic and private sectors. However, there has been no corresponding effort in either documenting the critical research opportunities or building a community that can create and foster productive collaborations. The two-part workshop series, STREAM: Streaming Requirements, Experience, Applications and Middleware Workshop (STREAM2015 and STREAM2016), were conducted to bring the community together and identify gaps and future efforts needed by both NSF and DOE. This report describes the discussions, outcomes and conclusions from STREAM2016: Streaming Requirements, Experience, Applications and Middleware Workshop, the second of these workshops held on March 22-23, 2016 in Tysons, VA. STREAM2016 focused on the Department of Energy (DOE) applications, computational and experimental facilities, as well software systems. Thus, the role of “streaming and steering” as a critical mode of connecting the experimental and computing facilities was pervasive through the workshop. Given the overlap in interests and challenges with industry, the workshop had significant presence from several innovative companies and major contributors. The requirements that drive the proposed research directions, identified in this report, show an important opportunity for building competitive research and development program around streaming data. These findings and recommendations are consistent with vision outlined in NRC Frontiers of Data and National Strategic Computing Initiative (NCSI) [1, 2]. The discussions from the workshop are captured as topic areas covered in this report's sections. The report

  12. Grantee Spotlight: Manuel L. Penichet, M.D., Ph.D. - Reprogramming the Immune System to Kill Cancer

    Science.gov (United States)

    Dr. Manuel L. Penichet, former CURE K01 trainee and NCI R01 grantee, aims to genetically engineer antibodies that can be used to directly target and eliminate cancer cells and also stimulate the body’s immune system to fight and destroy cancer.

  13. 77 FR 69715 - Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration

    Science.gov (United States)

    2012-11-20

    ... Contractor Registration AGENCY: Department of Defense (DoD), General Services Administration (GSA), and... changes the clauses requiring contractor registration in the Central Contractor Registration (CCR... unique identifier for contractors. It is used (1) to uniquely identify a contractor entity, and (2) to...

  14. Exposing government response action contractors to environmental tort liability

    International Nuclear Information System (INIS)

    Roy, M.J.

    1991-01-01

    Government contractors, particularly those involved with hazardous waste response action activities, are encountering increased risks for environmental tort liabilities. Contracts often include tasks and work assignments requiring the management of industrial, chemical, nuclear or mining wastes, spent fuels, munitions or other toxic substances. Contractors exposure to liability for damages results directly from the environmental laws and regulations pursuant to which the Government has contracted them to respond. Additionally, contractors may be exposed to common law liability under such dogmas as nuisance, trespass and strict liability in tort

  15. 75 FR 66680 - Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor...

    Science.gov (United States)

    2010-10-29

    ...-AG52 Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor... that contractors providing essential contractor services, as determined by the requiring activity..., implementing the requirements of DoDI 3020.37, Continuation of Essential DoD Contractor Services During Crises...

  16. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Science.gov (United States)

    2010-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984) (a...

  17. Documentation of the workshop on R and D and application of seismic emergency information system

    International Nuclear Information System (INIS)

    2000-07-01

    This report describes the summary of the workshop on R and D and application of Seismic Emergency Information System (SEIS) organized by Japan Atomic Energy Research Institute (JAERI) and National Research Institute for Earth Science and Disaster Prevention (NIED) held on December 20, 1999. Documents presented in the workshop are attached. The workshop consists of the following five technical sessions. - Session I: Objectives of Workshop, - Session II: Progress of R and D of SEIS, - Session III: Current status of application of Seismic Information Systems, - Session IV: Free-discussion for issues and future prospects of Information Systems, - Session V: Briefing, Subsequently to the introduction of objectives of the workshop, the four topics on the progress of R and D of the seismic information system were presented by JAERI and NIED. The discussions are summarized in three viewpoints, i.e.; utilization of the potential of JAERI activities to the R and D, clarification on the objectives and philosophy of the system, effective utilization of the result of R and D. In addition, the current status on the application of seismic information systems was presented by staffs of local government and etc. Issues and future prospects of the information systems were discussed. The workshop was summarized in the final session. (author)

  18. 42 CFR 495.348 - Procurement standards.

    Science.gov (United States)

    2010-10-01

    ... unfair competitive advantage, contractors that develop or draft grant applications, or contract... small businesses, minority-owned firms, and women's business enterprises, whenever possible. Grantees of Departmental awards must take all of the following steps to further this goal: (i) Ensure that small businesses...

  19. 78 FR 21116 - Proposed Collection; Comment Request

    Science.gov (United States)

    2013-04-09

    ...-0472. Needs and Uses: Executive Order 12829, ``National Industrial Security Program (NISP)'' Section... monitoring the contractors, licensees, and grantees who require or will require access to or who store or will store classified information; and for determining the eligibility for access to classified...

  20. 78 FR 30233 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Science.gov (United States)

    2013-05-22

    ... Number 0750-AG38 Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access... Government support contractors to have access to proprietary technical data belonging to prime contractors and other third parties, provided that the technical data owner may require the support contractor to...

  1. Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method

    Science.gov (United States)

    Alptekin, Orkun; Alptekin, Nesrin

    2017-10-01

    Selection of the most suitable contractor is an important process in public construction projects. This process is a major decision which may influence the progress and success of a construction project. Improper selection of contractors may lead to problems such as bad quality of work and delay in project duration. Especially in the construction projects of public buildings, the proper choice of contractor is beneficial to the public institution. Public procurement processes have different characteristics in respect to dissimilarities in political, social and economic features of every country. In Turkey, Turkish Public Procurement Law PPL 4734 is the main regulatory law for the procurement of the public buildings. According to the PPL 4734, public construction administrators have to contract with the lowest bidder who has the minimum requirements according to the criteria in prequalification process. Public administrators are not sufficient for selection of the proper contractor because of the restrictive provisions of the PPL 4734. The lowest bid method does not enable public construction administrators to select the most qualified contractor and they have realised the fact that the selection of a contractor based on lowest bid alone is inadequate and may lead to the failure of the project in terms of time delay Eand poor quality standards. In order to evaluate the overall efficiency of a project, it is necessary to identify selection criteria. This study aims to focus on identify importance of other criteria besides lowest bid criterion in contractor selection process of PPL 4734. In this study, a survey was conducted to staff of Department of Construction Works of Eskisehir Osmangazi University. According to TOPSIS (Technique for Order Preference by Similarity to the Ideal Solution) for analysis results, termination of construction work in previous tenders is the most important criterion of 12 determined criteria. The lowest bid criterion is ranked in rank 5.

  2. 78 FR 41070 - Notice of Single-Case Deviation from Competition Requirements: Transfer of Grantee Request for...

    Science.gov (United States)

    2013-07-09

    ... Single-Case Deviation from Competition Requirements: Transfer of Grantee Request for the Detroit Healthy... Health and Human Services (HHS). ACTION: Notice of Single-Case Deviation from Competition Requirements... pregnancy and interconceptional phases for women and infants residing in the proposed project area. In order...

  3. Project Finance Model for Small Contractors in USA

    Directory of Open Access Journals (Sweden)

    Jawahar Nesan

    2012-11-01

    Full Text Available Construction projects do not require a large capital outlay but a large working capital to start up the project. Unfortunately, for small contractors there are very limited options available from the banks or other lending institutions to cover this large working capital requirement in the absence of sufficient collateral. The “Project Finance” method presented in this paper is recommended as the most effective method for small contractors in the United States. The problems of small and start up contractors in funding their projects have been little addressed in the literature. The current financing practices were observed through both the literature review and interviews with contractors and bankers in the western Michigan area and subsequently a system has been proposed which could help a small start-up company seeking higher growth. The growth rates that can be achieved using the project finance system in contrast to the traditional “line of credit” arrangements as illustrated in this paper show that the project finance model is beneficial.

  4. 77 FR 31371 - Public Workshop: Privacy Compliance Workshop

    Science.gov (United States)

    2012-05-25

    ... presentations, including the privacy compliance fundamentals, privacy and data security, and the privacy... DEPARTMENT OF HOMELAND SECURITY Office of the Secretary Public Workshop: Privacy Compliance... Homeland Security Privacy Office will host a public workshop, ``Privacy Compliance Workshop.'' DATES: The...

  5. FCCSET/CEHR summer institutes for teacher development in science, mathematics, and technology. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report summarizes the profiling procedure that grantees used to carry out a formative evaluation of their summer institutes. It discusses programmatic issues identified through profiling as well as how well the profiling process worked for the grantees. The report contains recommendations on both programmatic issues and profiling for NSTC/DOE, NCISE (the technical assistance provider), and the grantees themselves. In early September NCISE held its second workshop for NSTC grantees. Data from the evaluation of this two-day event generated six recommendations for DOE and the technical assistance provider. This NCISE report summarizes the two-year process NCISE used in attempting to help the grantees establish some indicators of success. A number of indicators were identified the first year with others added the second year. Additionally, a compilation of the various measures for the indicators of success developed collaboratively by NCISE and grantees is included. Although these indicators are not mandatory, they do provide guides for grantees in assessing the impact of the institutes. Embedded in the report are several recommendations for NSTC/DOE and the technical assistance provider.

  6. Building America Expert Meeting Report. Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, Arlan [IBACOS Inc., Pittsburgh, PA (United States)

    2011-10-01

    This expert meeting was hosted by the IBACOS Building America research team to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting.

  7. 76 FR 50714 - Federal Acquisition Regulation; Documenting Contractor Performance; Correction

    Science.gov (United States)

    2011-08-16

    ... Regulation; Documenting Contractor Performance; Correction AGENCY: Department of Defense (DoD), General... August 9, 2011, regarding the proposed rule for Documenting Contractor Performance. DATES: The comment...

  8. Highlights of contractor initiatives in quality enhancement and productivity improvement

    Science.gov (United States)

    1986-01-01

    The NASA/Contractor Team efforts are presented as part of NASA's continuing effort to facilitate the sharing of quality and productivity improvement ideas among its contractors. This complilation is not meant to be a comprehensive review of contractor initiative nor does it necessarily express NASA's views. The submissions represent samples from a general survey, and were not edited by NASA. The efforts are examples of quality and productivity programs in private industry, and as such, highlight company efforts in individual areas. Topics range from modernization of equipment, hardware, and technology to management of human resources. Of particular interest are contractor initiatives which deal with measurement and evaluation data pertaining to quality and productivity performance.

  9. Medicare Administrative Contractor Performance Evaluation

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Centers for Medicare and Medicaid Services (CMS) has compiled a summary of overall Medicare Administrative Contractor (MAC) performance information as measured...

  10. 48 CFR 852.236-72 - Performance of work by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance of work by the....236-72 Performance of work by the contractor. As prescribed in 836.501, insert the following clause: Performance of Work by the Contractor (JUL 2002) The clause entitled “Performance of Work by the Contractor...

  11. Strategic management competencies in Scandinavian contractors

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2013-01-01

    Over the past ten years, a series of contractors operating in Denmark, Norway and Sweden have slowly but surely expanded their markets beyond their previous single-country base towards operating in Scandinavia as a whole, and beyond. This expansion has been accompanied by a restructuring of company...... management and HR concepts and approaches. Methodologically, a sample of the top level leaders of the hundred largest business units at some thirty Scandinavian contractors has been analysed. The focus is on the 400 top level managers in these organisations. On the basis of a desk study, an analysis of 124...

  12. Emerging Trends of the Owner-Contractor Relationship for Capital Facility Projects: From the Contractor Perspective

    National Research Council Canada - National Science Library

    Geertsema, Cameron

    2003-01-01

    .... Specifically, this document will focus on how the outcome of capital facility projects are affected by human resources practices, and the management principles and practices of the contractor-owner...

  13. Workshops som forskningsmetode

    OpenAIRE

    Ørngreen, Rikke; Levinsen, Karin Tweddell

    2017-01-01

    This paper contributes to knowledge on workshops as a research methodology, and specifically on how such workshops pertain to e-learning. A literature review illustrated that workshops are discussed according to three different perspectives: workshops as a means, workshops as practice, and workshops as a research methodology. Focusing primarily on the latter, this paper presents five studies on upper secondary and higher education teachers’ professional development and on teaching and learnin...

  14. DOE contractor's meeting on chemical toxicity

    International Nuclear Information System (INIS)

    1987-01-01

    The Office of Health and Environmental Research (OHER) is required to determine the potential health and environmental effects associated with energy production and use. To ensure appropriate communication among investigators and scientific disciplines that these research studies represent, OHER has sponsored workshops. This document provides a compilation of activities at the Third Annual DOE/OHER Workshop. This year's workshop was broadened to include all OHER activities identified as within the chemical effects area. The workshop consisted of eight sessions entitled Isolation and Detection of Toxic chemicals; Adduct Formation and Repair; Chemical Toxicity (Posters); Metabolism and Genotoxicity; Inhalation Toxicology; Gene Regulation; Metals Toxicity; and Biological Mechanisms. This document contains abstracts of the information presented by session

  15. 77 FR 51783 - Federal Acquisition Regulation; Information Collection; Contractors' Purchasing Systems Reviews

    Science.gov (United States)

    2012-08-27

    ...; Information Collection; Contractors' Purchasing Systems Reviews AGENCY: Department of Defense (DOD), General... collection requirement concerning contractors' purchasing systems reviews. Public comments are particularly... Information Collection 9000- 0132, Contractors' Purchasing Systems Reviews, by any of the following methods...

  16. 76 FR 60837 - Federal Acquisition Regulation; Information Collection; Contractor Business Ethics Compliance...

    Science.gov (United States)

    2011-09-30

    ...; Information Collection; Contractor Business Ethics Compliance Program and Disclosure Requirements AGENCIES... concerning contractor business ethics compliance program and disclosure requirements. Public comments are... Collection 9000- 0164, Contractor Business Ethics Compliance Program and Disclosure Requirements, by any of...

  17. Contractor firm strategies in delivering green project: A review

    Science.gov (United States)

    Powmya, Ayisha; Abidin, Nazirah Zainul; Azizi, Nurul Sakina Mokhtar

    2017-10-01

    Building green requires effort from various parties, from those who plan, design, manage and construct the building. Contractors are responsible for converting the design on paper into a real building and their role at the construction site support environmental sustainability by implementing responsible construction practices. Inefficient or inexperienced contractor in green construction project may find that delivering this type of project is not an easy task due to added requirement in design, stringent practices at site and the use of green technology and materials. Adopting suitable strategies at firm level will assist in preparatory process and readiness of delivering the green project. This paper reviews the strategies at firm level to deliver green construction project. From extensive literature review, it was discovered that there are six strategies to be adopted by the contractor. Understanding these strategies is expected to promote more contractors to be proactive in delivering green projects.

  18. 20 CFR 632.32 - Financial management systems.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Financial management systems. 632.32 Section... Financial management systems. (a) Each Native American grantee, subgrantee and contractor shall maintain a financial management system which will provide accurate, current and complete disclosure of the financial...

  19. 78 FR 59851 - Defense Federal Acquisition Regulation Supplement: Enhancement of Contractor Employee...

    Science.gov (United States)

    2013-09-30

    ...-AH97 Defense Federal Acquisition Regulation Supplement: Enhancement of Contractor Employee... contractor and subcontractor employees. DATES: Effective date: September 30, 2013. In accordance with FAR 1... Whistleblower Protections for Contractor Employees) made extensive changes to 10 U.S.C. 2409, entitled...

  20. Contractors on the Battlefield: What Have We Signed Up For?

    National Research Council Canada - National Science Library

    Zamparelli, Steven

    1999-01-01

    The role of contractors in warfare has changed dramatically. As the Services have drawn down, more and more of the duties formerly accomplished by military members are being performed by contractors...

  1. HTTR workshop (workshop on hydrogen production technology)

    International Nuclear Information System (INIS)

    Shiina, Yasuaki; Takizuka, Takakazu

    2004-12-01

    Various research and development efforts have been performed to solve the global energy and environmental problems caused by large consumption of fossil fuels. Research activities on advanced hydrogen production technology by the use of nuclear heat from high temperature gas cooled reactors, for example, have been flourished in universities, research institutes and companies in many countries. The Department of HTTR Project and the Department of Advanced Nuclear Heat Technology of JAERI held the HTTR Workshop (Workshop on Hydrogen Production Technology) on July 5 and 6, 2004 to grasp the present status of R and D about the technology of HTGR and the nuclear hydrogen production in the world and to discuss about necessity of the nuclear hydrogen production and technical problems for the future development of the technology. More than 110 participants attended the Workshop including foreign participants from USA, France, Korea, Germany, Canada and United Kingdom. In the Workshop, the presentations were made on such topics as R and D programs for nuclear energy and hydrogen production technologies by thermo-chemical or other processes. Also, the possibility of the nuclear hydrogen production in the future society was discussed. The workshop showed that the R and D for the hydrogen production by the thermo-chemical process has been performed in many countries. The workshop affirmed that nuclear hydrogen production could be one of the competitive supplier of hydrogen in the future. The second HTTR Workshop will be held in the autumn next year. (author)

  2. Summary of the Second Workshop on Liquid Argon Time Projection Chamber Research and Development in the United States

    CERN Document Server

    Acciarri, R; Artrip, D; Baller, B; Bromberg, C; Cavanna, F; Carls, B; Chen, H; Deptuch, G; Epprecht, L; Dharmapalan, R; Foreman, W; Hahn, A; Johnson, M; Jones, B J P; Junk, T; Lang, K; Lockwitz, S; Marchionni, A; Mauger, C; Montanari, C; Mufson, S; Nessi, M; Back, H Olling; Petrillo, G; Pordes, S; Raaf, J; Rebel, B; Sinins, G; Soderberg, M; Spooner, N J C; Stancari, M; Strauss, T; Terao, K; Thorn, C; Tope, T; Toups, M; Urheim, J; Van de Water, R; Wang, H; Wasserman, R; Weber, M; Whittington, D; Yang, T

    2015-01-01

    The second workshop to discuss the development of liquid argon time projection chambers (LArTPCs) in the United States was held at Fermilab on July 8-9, 2014. The workshop was organized under the auspices of the Coordinating Panel for Advanced Detectors, a body that was initiated by the American Physical Society Division of Particles and Fields. All presentations at the workshop were made in six topical plenary sessions: $i)$ Argon Purity and Cryogenics, $ii)$ TPC and High Voltage, $iii)$ Electronics, Data Acquisition and Triggering, $iv)$ Scintillation Light Detection, $v)$ Calibration and Test Beams, and $vi)$ Software. This document summarizes the current efforts in each of these areas. It primarily focuses on the work in the US, but also highlights work done elsewhere in the world.

  3. Summary of the Second Workshop on Liquid Argon Time Projection Chamber Research and Development in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Acciarri, R. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); et al.

    2015-04-21

    The second workshop to discuss the development of liquid argon time projection chambers (LArTPCs) in the United States was held at Fermilab on July 8-9, 2014. The workshop was organized under the auspices of the Coordinating Panel for Advanced Detectors, a body that was initiated by the American Physical Society Division of Particles and Fields. All presentations at the workshop were made in six topical plenary sessions: i) Argon Purity and Cryogenics, ii) TPC and High Voltage, iii) Electronics, Data Acquisition and Triggering, iv) Scintillation Light Detection, v) Calibration and Test Beams, and vi) Software. This document summarizes the current efforts in each of these areas. It primarily focuses on the work in the US, but also highlights work done elsewhere in the world.

  4. 75 FR 55577 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2010-09-13

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9200-8] Clean Water Act; Contractor Access to Confidential... Recovery Act (RCRA). Transfer of the information will allow the contractor and subcontractors to access... contractors and subcontractors over the history of the effluent guidelines program. EPA determined that this...

  5. 75 FR 82575 - Federal Acquisition Regulation; Personal Identity Verification of Contractor Personnel

    Science.gov (United States)

    2010-12-30

    ... 9000-AL60 Federal Acquisition Regulation; Personal Identity Verification of Contractor Personnel AGENCY... requirement of collecting from contractors all forms of Government-provided identification once they are no...D Inspector General Audit Report No. D-2009-005, entitled ``Controls Over the Contractor Common...

  6. 77 FR 60962 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2012-10-05

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 2 [FRL-9733-8] Clean Water Act; Contractor Access to... transfer of confidential business information to contractor, subcontractors, and consultants. SUMMARY: The... certain industries. We have determined that the contractors listed below require access [[Page 60963

  7. 77 FR 51496 - Federal Acquisition Regulation; Basic Safeguarding of Contractor Information Systems

    Science.gov (United States)

    2012-08-24

    ... Federal Acquisition Regulation; Basic Safeguarding of Contractor Information Systems AGENCY: Department of... Acquisition Regulation (FAR) to add a new subpart and contract clause for the basic safeguarding of contractor... information) that will be resident on or transiting through contractor information systems. DATES: Interested...

  8. 75 FR 60452 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2010-09-30

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9208-9] Clean Water Act; Contractor Access to Confidential... electric industry to a new subcontractor of a contractor, Eastern Research Group (ERG). EPA previously... contractors and subcontractors to access information necessary to support EPA in the planning, development...

  9. 76 FR 4343 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Science.gov (United States)

    2011-01-25

    ...; Contractor Conflicts of Interest AGENCY: Environmental Protection Agency. ACTION: Notice. SUMMARY: In... control numbers in certain EPA regulations is consolidated in 40 CFR part 9. Abstract: EPA contractors... cleanup and enforcement and because its contractors are often involved in both activities, it is...

  10. 76 FR 81490 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Science.gov (United States)

    2011-12-28

    ... Activities; Proposed Collection; Comment Request; Contractor Cumulative Claim and Reconciliation (Renewal... identify the Docket ID Number EPA-HQ-OARM-2011-0997, Contractor Cumulative Claim and Reconciliation. Hand... information collection activity or ICR does this apply to? Affected entities: All contractors who have...

  11. The main factor affecting the competitiveness of Contractor Company

    Science.gov (United States)

    Nurisra; Malahayati, Nurul; Mahmuddin

    2018-05-01

    Contractor companies must have the competitive advantage to compete in maintaining the survival of the company. Problems arise because quite a lot of advantages can be used and these advantages must be used appropriately to produce competitiveness for the company to continue to compete and to win the competition. This study aims to determine the main factors affecting the competitiveness of medium-class contractors in Banda Aceh. Data collection was obtained through questionnaires distributed to 31 middle-class contractors in Banda Aceh. Data processing and analysis is done by using descriptive analysis. Based on the result of descriptive analysis, it can be concluded that the most important competitiveness factor with a mean score value 4.52 is the relationship, and the factor that has the highest mean score value is the relationship with the government of 4.97, while the result of the ranking analysis is obtained 25 factor that is critical to the competitiveness of medium-class contractors in Banda Aceh.

  12. ACED Federal Grant Contractor Tracking

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Dataset includes grant, project, and contractor awarded which are tracked for ensuring Davis-Bacon Act compliance where applicable. The 1931 Davis-Bacon Act...

  13. Construction Manager or General Contractor?

    Science.gov (United States)

    McKinley, John

    1991-01-01

    Unlike the general contractor approach, the construction management firm acts on behalf of the school district in school construction. Examines the development and nature of construction management, and cites its advantages and disadvantages. (MLF)

  14. Summary of SMIRT20 Preconference Topical Workshop - Identifying Structural Issues in Advanced Reactors

    International Nuclear Information System (INIS)

    Richins, William; Novascone, Stephen; O'Brien, Cheryl

    2009-01-01

    The Idaho National Laboratory (INL, USA) and IASMiRT sponsored an international forum Nov 5-6, 2008 in Porvoo, Finland for nuclear industry, academic, and regulatory representatives to identify structural issues in current and future advanced reactor design, especially for extreme conditions and external threats. The purpose of this Topical Workshop was to articulate research, engineering, and regulatory Code development needs. The topics addressed by the Workshop were selected to address critical industry needs specific to advanced reactor structures that have long lead times and can be the subject of future SMiRT technical sessions. The topics were; (1) structural/materials needs for extreme conditions and external threats in contemporary (Gen. III) and future (Gen. IV and NGNP) advanced reactors and (2) calibrating simulation software and methods that address topic 1. The workshop discussions and research needs identified are presented. The Workshop successfully produced interactive discussion on the two topics resulting in a list of research and technology needs. It is recommended that IASMiRT communicate the results of the discussion to industry and researchers to encourage new ideas and projects. In addition, opportunities exist to retrieve research reports and information that currently exists, and encourage more international cooperation and collaboration. It is recommended that IASMiRT continue with an off-year workshop series on select topics.

  15. Drawing the critical distinction between independent contractors and permanent employees : the tax implications

    Energy Technology Data Exchange (ETDEWEB)

    Bodie, J.S.; Haymour, J. [Fraser Milner, Calgary, AB (Canada)

    1999-10-01

    The many factors that should be considered when distinguishing between an independent contractor and an employee from the perspective of tax laws were discussed. Some of the major areas where disputes regarding relationships between the employee and the independent contractor arise were reviewed with particular emphasis on some of the dangers associated with a change in characterization of these types of relationships. Ways in which to guard against these dangers were also presented. The courts have established the following four tests to determine a contractor`s status: (1) the control test, (2) the economic reality test, (3) the business integration test, and (4) the ownership of tools test. The control tests looks to the degree of control that an employer/recipient of services possesses over the work that is to be performed. The economic reality test looks to whether the contractor is actually in business for himself and is risking a loss. The business integration test examines the relationship between employer and contractor in terms of how economically dependent the contractor is on the employer and whether the task the contractor carries on forms an integral part of the business of the employer. The last test examines who owns the tools used by the contractor to carry out his duties. This presentation also reviewed how employers and contractors are responsible for adhering to Revenue Canada tax laws and certain liabilities regarding income taxes, Employment Insurance (EI) premiums, Canada Pension Plan (CPP) contributions and other amounts.

  16. 76 FR 20661 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Science.gov (United States)

    2011-04-13

    ... Activities; Proposed Collection; Comment Request; Contractor Conflicts of Interest AGENCY: Environmental....regulations.gov . Title: Contractor Conflicts of Interest. ICR numbers: EPA ICR No. 1550.09, OMB Control No... control numbers in certain EPA regulations is consolidated in 40 CFR part 9. Abstract: EPA contractors...

  17. 78 FR 79692 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2013-12-31

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9904-94-OW] Clean Water Act; Contractor Access to... Transfer of Confidential Business Information to Contractor, Subcontractors, and Consultants. SUMMARY: The... contractors listed below require access to CBI submitted to EPA under Section 308 of the Clean Water Act (CWA...

  18. Contingency Contractor Optimization Phase 3 Sustainment Database Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, Christopher Rawls; Durfee, Justin David; Bandlow, Alisa; Gearhart, Jared Lee; Jones, Katherine A

    2016-05-01

    The Contingency Contractor Optimization Tool – Prototype (CCOT-P) database is used to store input and output data for the linear program model described in [1]. The database allows queries to retrieve this data and updating and inserting new input data.

  19. 77 FR 13153 - Information Collection; NASA Contractor Financial Management Reports

    Science.gov (United States)

    2012-03-05

    ..., [email protected] . SUPPLEMENTARY INFORMATION: I. Abstract The NASA Contractor Financial Management... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice 12-019] Information Collection; NASA Contractor Financial Management Reports AGENCY: National Aeronautics and Space Administration (NASA). ACTION...

  20. 48 CFR 307.108-70 - Telecommuting of contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Telecommuting of... Telecommuting of contractor employees. (a) SOWs/PWSs shall permit offerors or contractors to specify their own... telecommuting) for any part of an SOW/PWS, after determining that the work or any portion thereof must be...

  1. 23 CFR 635.110 - Licensing and qualification of contractors.

    Science.gov (United States)

    2010-04-01

    ... licensing contractors, who may bid for, be awarded, or perform Federal-aid highway contracts, shall be... competition, to prevent submission of a bid by, or to prohibit the consideration of a bid submitted by, any...) No contractor shall be required by law, regulation, or practice to obtain a license before submission...

  2. Cross-national research on contractor evaluation procedures in public works procurement

    Science.gov (United States)

    Kinoshita, Seiya; Sato, Naoyoshi; Matsumoto, Naoya

    Contractor evaluation methods in Japan's public works procurement, beginning with construction business licensure, going through biennial preliminary firm rating, up to project-by-project prequalification and comprehensive point rating, were developed during the period when public works were mostly procured through designated competitive bidding. It is essential to focus attention on contractor evaluation methods for introducing different types of procurement procedures which enhance the use of technological capabilities held by private businesses. An overall review of contractor evaluation procedures should be conducted in view of the present situation, where the open competitive bidding has become mainly used in combination with comprehensive evaluation, as well as to allow for further diversification of procurement methods. In Western countries, improvements have been made for the past several years in contractor evaluation procedures with more emphasis on "Value for Money." Advanced efforts made by these countries will be useful as a reference for overhauling Japan's contractor evaluation system. This study conducts a comparative review of contractor evaluation procedures for public procurement in Western countries such as the United States, the United Kingdom and France by identifying similarities and differences between those of Japan and the above mentioned countries. This reveals that a contractor's technical or professional ability is looked at separately from its economic and financial standing in those countries studied, and there is no case like Japan in which those two factors are integrated into one for evaluation.

  3. Contingency Contractor Optimization Phase 3 Sustainment Third-Party Software List - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    2016-05-01

    The Contingency Contractor Optimization Tool - Prototype (CCOT-P) requires several third-party software packages. These are documented below for each of the CCOT-P elements: client, web server, database server, solver, web application and polling application.

  4. Selection of disposal contractor by multi criteria decision making methods

    Directory of Open Access Journals (Sweden)

    Cenker Korkmazer

    2016-08-01

    Full Text Available Hazardous waste is substance that threaten people and environment in case of improper storage, disposal and transport due to its concentration, physical and chemical properties. Companies producing hazardous waste as a result of several activities mostly do not have any own disposal facilities. In addition, they do not pay attention enough to determine the right contractor as a disposal facility. On the other hand, there are various qualitative and quantitative criteria affecting the selection of the contractor and conflicting with each other. The aim of the performed study is to assist one of these companies producing hazardous waste in the selection of the best contractor that eliminates hazardous waste economic and harmless way. In the study, contractor weights in percentage is calculated by using Analytic Network Process (ANP as one of the multi-criteria decision making (MCDM methods and widely used in the literature which considers both qualitative and quantitative criteria. In the next step, by the help of the mathematical model, contractors that will be given which type of hazardous waste are identified. This integrated approach can be used as a guide for similar firms.

  5. Innovation Strategy in Slovak Forest Contractor Firms—A SWOT Analysis

    Directory of Open Access Journals (Sweden)

    Martina Štěrbová

    2016-05-01

    Full Text Available The aim of the study is to determine the innovation strategy of contractor firms in the Slovak forestry service sector in the area of further innovation activities development. The strategy identification was based on the analysis of the strengths, weaknesses, opportunities and threats in this sector. The results indicate that weaknesses of contractor firms exceed their strengths and, considering the degree and importance of their impact, opportunities exceed identified threats. Based on these findings revealing the relations in the area of innovation activities of forestry service contractors, the “Strategy of Partnership” was suggested as the most suitable type of strategy. It can be concluded that such a form of grouping cooperation brings many benefits to contractors in the form of information availability, guidance, training, and management of conflicts, risks and uncertainty, which are associated with the innovation process.

  6. 77 FR 17098 - Proposed Extension of Existing Information Collection; Independent Contractor Registration and...

    Science.gov (United States)

    2012-03-23

    ... Information Collection; Independent Contractor Registration and Identification AGENCY: Mine Safety and Health...-00040, Independent Contractor Register. OMB last approved this information collection request (ICR) on...); or 202-693-9441 (facsimile). SUPPLEMENTARY INFORMATION: I. Background Independent contractors...

  7. 75 FR 43166 - Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients

    Science.gov (United States)

    2010-07-23

    ...] Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients AGENCY: Office... information collection requirement regarding Central Contractor Registration Requirements for Prime Grant... for the proper performance of functions of the Central Contractor Registration Requirements for Prime...

  8. Radiation exposures for DOE and DOE contractor employees, 1989

    International Nuclear Information System (INIS)

    Smith, M.H.; Eschbach, P.A.; Harty, R.; Millet, W.H.; Scholes, V.A.

    1992-12-01

    All US Department of Energy (DOE) and DOE contractors, are required to submit occupational radiation exposure records to a central depository. In 1989, data were required to be submitted for all employees who were required to be monitored in accordance with DOE Order 5480.11 and for all visitors who had a positive exposure. The data required included the external penetrating whole-body dose equivalent, the shallow dose equivalent, and a summary of internal depositions of radioactive material above specified limits. Data regarding the exposed individuals included the individual's age, sex, and occupational category. This report is a summary of the external penetrating whole-body dose equivalents and shallow dose equivalents reported by DOE and DOE contractors for the calendar year 1989. A total of 90,882 DOE and DOE contractor employees were reported to have been monitored for whole-body ionizing radiation exposure during 1989. This represents 53.6% of all DOE and DOE contractor employees and is an increase (4.3 %) from the number of monitored employees for 1988. In addition to the employees, 12,643 visitors were monitored

  9. EDRP public local inquiry, UKAEA/BNFL precognition on: Contractor accommodation

    International Nuclear Information System (INIS)

    Scott, W.

    1986-01-01

    The availability of accommodation for contractors working on the proposed EDRP at Dounreay is discussed. It is predicted that the contractors could be accommodated without the need for special arrangement and with no adverse effect on the tourist industry. (U.K.)

  10. Drawing the critical distinction between independent contractors and permanent employees : the tax implications

    International Nuclear Information System (INIS)

    Bodie, J.S.; Haymour, J.

    1999-01-01

    The many factors that should be considered when distinguishing between an independent contractor and an employee from the perspective of tax laws were discussed. Some of the major areas where disputes regarding relationships between the employee and the independent contractor arise were reviewed with particular emphasis on some of the dangers associated with a change in characterization of these types of relationships. Ways in which to guard against these dangers were also presented. The courts have established the following four tests to determine a contractor's status: (1) the control test, (2) the economic reality test, (3) the business integration test, and (4) the ownership of tools test. The control tests looks to the degree of control that an employer/recipient of services possesses over the work that is to be performed. The economic reality test looks to whether the contractor is actually in business for himself and is risking a loss. The business integration test examines the relationship between employer and contractor in terms of how economically dependent the contractor is on the employer and whether the task the contractor carries on forms an integral part of the business of the employer. The last test examines who owns the tools used by the contractor to carry out his duties. This presentation also reviewed how employers and contractors are responsible for adhering to Revenue Canada tax laws and certain liabilities regarding income taxes, Employment Insurance (EI) premiums, Canada Pension Plan (CPP) contributions and other amounts

  11. Drawing the critical distinction between independent contractors and permanent employees : the tax implications

    Energy Technology Data Exchange (ETDEWEB)

    Bodie, J.S.; Haymour, J. [Fraser Milner, Calgary, AB (Canada)

    1999-07-01

    The many factors that should be considered when distinguishing between an independent contractor and an employee from the perspective of tax laws were discussed. Some of the major areas where disputes regarding relationships between the employee and the independent contractor arise were reviewed with particular emphasis on some of the dangers associated with a change in characterization of these types of relationships. Ways in which to guard against these dangers were also presented. The courts have established the following four tests to determine a contractor's status: (1) the control test, (2) the economic reality test, (3) the business integration test, and (4) the ownership of tools test. The control tests looks to the degree of control that an employer/recipient of services possesses over the work that is to be performed. The economic reality test looks to whether the contractor is actually in business for himself and is risking a loss. The business integration test examines the relationship between employer and contractor in terms of how economically dependent the contractor is on the employer and whether the task the contractor carries on forms an integral part of the business of the employer. The last test examines who owns the tools used by the contractor to carry out his duties. This presentation also reviewed how employers and contractors are responsible for adhering to Revenue Canada tax laws and certain liabilities regarding income taxes, Employment Insurance (EI) premiums, Canada Pension Plan (CPP) contributions and other amounts.

  12. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  13. Integrating Contractors into the Logistics Force

    National Research Council Canada - National Science Library

    Terrell, Ronald G

    2006-01-01

    ... a panacea. For a combatant commander to effectively integrate them with his military force requires an understanding of the operational environment, contractor capabilities, acceptable levels of risk...

  14. Private Military and Security Contractors

    DEFF Research Database (Denmark)

    In Private Military and Security Contractors: Controlling the Corporate Warrior a multinational team of 16 scholars and a practitioner from political science, sociology, and law address a developing phenomenon: controlling the use of privatized force by states in international politics. Robust...

  15. 7 CFR Exhibit A to Subpart I of... - Self-Help Technical Assistance Grant Agreement

    Science.gov (United States)

    2010-01-01

    ...) RURAL HOUSING SERVICE, RURAL BUSINESS-COOPERATIVE SERVICE, RURAL UTILITIES SERVICE, AND FARM SERVICE... rights under 7 CFR part 1900, subpart B. (f) An extension of this grant agreement may be approved by FmHA... value from suppliers, contractors, or others doing business with the grantee. To the extent permissible...

  16. 78 FR 23935 - Federal Acquisition Regulation; Information Collection; Contractor Use of Interagency Fleet...

    Science.gov (United States)

    2013-04-23

    ...; Information Collection; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department of... previously approved information collection requirement concerning contractor use of interagency fleet... Collection 9000- 0032, Contractor Use of Interagency Fleet Management System Vehicles, by any of the...

  17. How Loud Is Too Loud?

    Medline Plus

    Full Text Available ... Health Resources Clinical Studies Research Extramural Research Intramural Research Scientific Workshop and Meeting Reports Meet NIDCD Scientists and Grantees Research Resources Clinical Studies Funding Types of Grants and ...

  18. 48 CFR 252.237-7023 - Continuation of Essential Contractor Services.

    Science.gov (United States)

    2010-10-01

    ... provide a written plan for continuing the performance of essential contractor services identified in...; and (v) The approach for communicating expectations to contractor employees regarding their roles and... or other designated representative as expeditiously as possible and use its best efforts to cooperate...

  19. 78 FR 29247 - Contractor Legal Management Requirements; Acquisition Regulations; Correction

    Science.gov (United States)

    2013-05-20

    ... DEPARTMENT OF ENERGY 48 CFR Part 952 RIN 1990-AA37 Contractor Legal Management Requirements; Acquisition Regulations; Correction AGENCY: Department of Energy. ACTION: Final rule; correction. SUMMARY: The... (78 FR 25795). In this document, DOE revised existing regulations covering contractor legal management...

  20. 34 CFR 386.34 - What assurances must be provided by a grantee that intends to provide scholarships?

    Science.gov (United States)

    2010-07-01

    ... norm. (ii) A maximum timeframe in which the scholar shall complete the scholar's educational objective... disbursement of scholarship funds to the individual for payment of the individual's expenses, such as tuition... the scholar's failure to meet the obligation of § 386.43. (d) Executed agreement. The grantee will...

  1. The Inadequacy of Existing Far Provisions to Ensure Contractor Environmental Compliance

    National Research Council Canada - National Science Library

    MacDonald, Edward

    1997-01-01

    This thesis focuses on situations where the obligation is on the contractor, and examines the existing FAR provisions and clauses to explore whether they are adequate to ensure government contractor...

  2. 75 FR 71564 - Defense Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS...

    Science.gov (United States)

    2010-11-24

    ... Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS Case 2009-D025... conducting a Contractor Insurance/Pension Review from Procedures, Guidance, and Information (PGI) to the... This final rule relocates requirements for Contractor Insurance/ Pension Review to DFARS 242.7302 from...

  3. 78 FR 60169 - Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee...

    Science.gov (United States)

    2013-09-30

    ... 9000-AM56 Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee... program enhancing whistleblower protections for contractor employees. DATES: Effective: September 30, 2013... contractor employees at FAR subpart 3.9. The pilot program is mandated by section 828, entitled ``Pilot...

  4. Environmental effects of marine energy development around the world. Annex IV Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Copping, Andrea; Hanna, Luke; Whiting, Johnathan; Geerlofs, Simon; Grear, Molly; Blake, Kara [Pacific Northwest National Laboratory, Richland, WA (United States); Coffey, Anna; Massaua, Meghan; Brown-Saracino, Jocelyn; Battey, Hoyt [US Dept. of Energy, Washington, DC (United States)

    2013-01-15

    Annex IV is an international collaborative project to examine the environmental effects of marine energy devices among countries through the International Energy Agency’s Ocean Energy Systems Initiative (OES). The U.S. Department of Energy (DOE) serves as the Operating Agent for the Annex, in partnership with the Bureau of Ocean Energy Management (BOEM; formerly the Minerals Management Service), the Federal Energy Regulatory Commission (FERC), and National Oceanographic and Atmospheric Administration (NOAA). Numerous ocean energy technologies and devices are being developed around the world, and the few data that exist about the environmental effects of these technologies are dispersed among countries and developers. The purpose of Annex IV is to facilitate efficient government oversight of the development of ocean energy systems by compiling and disseminating information about the potential environmental effects of marine energy technologies and to identify methods of monitoring for these effects. Beginning in 2010, this three-year effort produced a publicly available searchable online database of environmental effects information (Tethys). It houses scientific literature pertaining to the environmental effects of marine energy systems, as well as metadata on international ocean energy projects and research studies. Two experts’ workshops were held in Dublin, Ireland (September 2010 and October 2012) to engage with international researchers, developers, and regulators on the scope and outcomes of the Annex IV project. Metadata and information stored in the Tethys database and feedback obtained from the two experts’ workshops were used as resources in the development of this report. This Annex IV final report contains three case studies of specific interactions of marine energy devices with the marine environment that survey, compile, and analyze the best available information in one coherent location. These case studies address 1) the physical interactions

  5. Site contractor participation in the DOE SWEIS process at Los Alamos, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Pendergrass, A.; Garvey, D.

    1997-12-01

    The U.S. Department of Energy (DOE) prepares site-wide environmental impact statements (SWEIS) on sites that are to remain in operation in order to provide an estimate of the cumulative environmental impacts from projected future operations at the site. DOE has relied on outside contractors rather than the site management and operating (M&O) contractors to prepare EISs, in order to preclude the potential for conflict of interest. The site M&O contractors, who know the potential for conflict of interest. The site M&O contractors, who know the site best and are most familiar with existing information, are critical support for the contractor. The University of California (UC) is the site M&O contractor for Los Alamos National Laboratory (LANL) in Los Alamos, NM. The role of LANL (UC) personnel in DOE`s preparation process for the LANL SWEIS is described. 3 refs.

  6. Beyond the design fix - New industrialisation in contractor's supplier relationships

    DEFF Research Database (Denmark)

    Koch, Christian; Frödell, M.; Josephson, P.E.

    2010-01-01

    by the Erabuild program, this paper presents 3 cases of long term transformation of contractor- supplier relations as general contractors outsource and commence professionalising purchasing moving it from project purchasing into strategic purchasing. It is suggested that “new industrialisation” is a long term...

  7. 48 CFR 509.308-1 - Testing performed by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Testing performed by the... ADMINISTRATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 509.308-1 Testing performed by the contractor. In FSS solicitations and contracts that will require...

  8. Contractor-style tunnel cost estimating

    International Nuclear Information System (INIS)

    Scapuzzi, D.

    1990-06-01

    Keeping pace with recent advances in construction technology is a challenge for the cost estimating engineer. Using an estimating style that simulates the actual construction process and is similar in style to the contractor's estimate will give a realistic view of underground construction costs. For a contractor-style estimate, a mining method is chosen; labor crews, plant and equipment are selected, and advance rates are calculated for the various phases of work which are used to determine the length of time necessary to complete each phase of work. The durations are multiplied by the cost or labor and equipment per unit of time and, along with the costs for materials and supplies, combine to complete the estimate. Variations in advance rates, ground support, labor crew size, or other areas are more easily analyzed for their overall effect on the cost and schedule of a project. 14 figs

  9. 78 FR 4425 - Notice of Proposed Information Collection: Comment Request; Multifamily Contractor's Mortgagor's...

    Science.gov (United States)

    2013-01-22

    ... Information Collection: Comment Request; Multifamily Contractor's Mortgagor's Cost Breakdowns and... comments on the subject proposal. Contractors use the form HUD-2328 to establish a schedule of values of construction items on which the monthly advances or mortgage proceeds are based. Contractors use the form HUD...

  10. 76 FR 68017 - Federal Acquisition Regulation; Preventing Personal Conflicts of Interest for Contractor...

    Science.gov (United States)

    2011-11-02

    ... Contractor Employees Performing Acquisition Functions AGENCIES: Department of Defense (DoD), General Services... personal conflicts of interest by employees of Government contractors as required by statute. DATES... clause for future orders. In the event that a contractor refuses to accept such a modification, the...

  11. 75 FR 55671 - Financial Assistance Use of Universal Identifier and Central Contractor Registration

    Science.gov (United States)

    2010-09-14

    ... of Universal Identifier and Central Contractor Registration AGENCY: Office of Federal Financial...) numbers and maintain current registrations in the Central Contractor Registration (CCR) database. An... CONTRACTOR REGISTRATION Sec. Subpart A--General 25.100 Purposes of this part. 25.105 Types of awards to which...

  12. Contractors In The Theater: Implications For Joint Operational Planning And Execution

    National Research Council Canada - National Science Library

    Binder, Jeanne

    2003-01-01

    The use of contractors in the theater of operations is nothing new. However downsizing efforts and outsourcing as well as the increasing complexity of military equipment has increased military reliance on contractors...

  13. 34 CFR 350.63 - What are the requirements of a grantee relative to the Client Assistance Program?

    Science.gov (United States)

    2010-07-01

    ... Client Assistance Program? 350.63 Section 350.63 Education Regulations of the Offices of the Department... After an Award? § 350.63 What are the requirements of a grantee relative to the Client Assistance... representatives, of the availability and purposes of the Client Assistance Program (CAP) funded under the Act; and...

  14. Contractor Development Models for Promoting Sustainable Building – a case for developing management capabilities of contractors

    CSIR Research Space (South Africa)

    Dlungwana, Wilkin S

    2004-11-01

    Full Text Available Construction industry and indeed all small and medium-sized contractors play a significant socio-economic role in the developing countries. This paper highlights the importance of promoting sustainable building through the implementation...

  15. 48 CFR 2052.209-72 - Contractor organizational conflicts of interest.

    Science.gov (United States)

    2010-10-01

    ... conflicts of interest. 2052.209-72 Section 2052.209-72 Federal Acquisition Regulations System NUCLEAR... Clauses 2052.209-72 Contractor organizational conflicts of interest. As prescribed at 2009.570-5(a) and..., contracts, and simplified acquisitions of the types described; 2009.570-4(b): Contractor Organizational...

  16. 48 CFR 252.247-7016 - Contractor liability for loss or damage.

    Science.gov (United States)

    2010-10-01

    ... the Contractor's negligence, indemnification shall be at a rate not to exceed sixty cents per pound per article. (ii) Negligent damage. When loss or damage is caused by the negligence of the Contractor...

  17. Military Contractors - Too Much Dependence

    Science.gov (United States)

    2008-03-19

    promotes integrity, physical strength, health, unity, cooperation and teamwork. It combats stereotyping and sexual harassment. It fosters in its...weeklyreport108-000001337290&type= toc &num=115&; accessed 15 Jan 2008. 20 U.S. Department of the Army, Contractors on the Battlefield, Field Manual 3

  18. Proceedings of the fuels technology contractors review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Malone, R.D. [ed.

    1993-11-01

    The Fuels Technology Contractors Review Meeting was held November 16-18, 1993, at the Morgantown Energy Technology Center (METC) in Morgantown, West Virginia. This meeting was sponsored and hosted by METC, the Office of Fossil Energy, U.S. Department of Energy (DOE). METC periodically provides an opportunity to bring together all of the R&D participants in a DOE-sponsored contractors review meeting to present key results of their research and to provide technology transfer to the active research community and to the interested public. This meeting was previously called the Natural Gas Technology Contractors Review Meeting. This year it was expanded to include DOE-sponsored research on oil shale and tar sands and so was retitled the Fuels Technology Contractors Review Meeting. Current research activities include efforts in both natural gas and liquid fuels. The natural gas portion of the meeting included discussions of results summarizing work being conducted in fracture systems, both natural and induced; drilling, completion, and stimulation research; resource characterization; delivery and storage; gas to liquids research; and environmental issues. The meeting also included project and technology summaries on research in oil shale, tar sands, and mild coal gasification, and summaries of work in natural-gas fuel cells and natural-gas turbines. The format included oral and poster session presentations. Individual papers have been processed separately for inclusion in the Energy Science and Technology database.

  19. Developing workshop module of realistic mathematics education: Follow-up workshop

    Science.gov (United States)

    Palupi, E. L. W.; Khabibah, S.

    2018-01-01

    Realistic Mathematics Education (RME) is a learning approach which fits the aim of the curriculum. The success of RME in teaching mathematics concepts, triggering students’ interest in mathematics and teaching high order thinking skills to the students will make teachers start to learn RME. Hence, RME workshop is often offered and done. This study applied development model proposed by Plomp. Based on the study by RME team, there are three kinds of RME workshop: start-up workshop, follow-up workshop, and quality boost. However, there is no standardized or validated module which is used in that workshops. This study aims to develop a module of RME follow-up workshop which is valid and can be used. Plopm’s developmental model includes materials analysis, design, realization, implementation, and evaluation. Based on the validation, the developed module is valid. While field test shows that the module can be used effectively.

  20. Critical Electronic Data Loss Perceptions of United States Military Contractors

    Science.gov (United States)

    Singletary, Tod J.

    2017-01-01

    The United States Military has become increasingly dependent upon technology to meet its mission objectives with a consequence being greater dependence on civilian defense contractors to provide specialized services in support of high-tech mission requirements. Modern military defense contractors have also become dependent upon reliable and secure…

  1. 48 CFR 52.209-3 - First Article Approval-Contractor Testing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false First Article Approval... Clauses 52.209-3 First Article Approval—Contractor Testing. As prescribed in 9.308-1 (a) and (b), insert the following clause: First Article Approval—Contractor Testing (SEP 1989) [Contracting Officer shall...

  2. Appeals - Redetermination by a Medicare Contractor

    Data.gov (United States)

    U.S. Department of Health & Human Services — A redetermination is an examination of a claim by the fiscal intermediary (FI), carrier, or Medicare Administrative Contractor (MAC) personnel who are different from...

  3. Creating Fantastic PI Workshops

    Energy Technology Data Exchange (ETDEWEB)

    Biedermann, Laura B. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Clark, Blythe G. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Colbert, Rachel S. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Dagel, Amber Lynn [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gupta, Vipin P. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hibbs, Michael R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Perkins, David Nikolaus [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); West, Roger Derek [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-10-01

    The goal of this SAND report is to provide guidance for other groups hosting workshops and peerto-peer learning events at Sandia. Thus this SAND report provides detail about our team structure, how we brainstormed workshop topics and developed the workshop structure. A Workshop “Nuts and Bolts” section provides our timeline and check-list for workshop activities. The survey section provides examples of the questions we asked and how we adapted the workshop in response to the feedback.

  4. Human Resources Staffing Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    BOSLEY, J.W.

    2000-01-01

    The Human Resources Staffing Plan quantified the equivalent staffing needs required for the Tank Farm Contractor (TFC) and its subcontractors to execute the readiness to proceed baseline between FY 2000-2008. The TFC staffing needs were assessed along with the staffings needs of Fluor Hanford and the privatization contractor. The plan then addressed the staffing needs and recruitment strategies required to execute the baseline

  5. 34 CFR 628.45 - How much endowment fund income may a grantee use and for what purposes?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false How much endowment fund income may a grantee use and for what purposes? 628.45 Section 628.45 Education Regulations of the Offices of the Department of... necessary because of— (1) A financial emergency such as a pending insolvency or temporary liquidity problem...

  6. Application of integrated fuzzy VIKOR & AHP methodology to contractor ranking

    Directory of Open Access Journals (Sweden)

    Mohamad Rahim Ramezaniyan

    2012-08-01

    Full Text Available Contractor selection is a critical activity, which plays an important role in the overall success of any construction project. The implementation of fuzzy multiple criteria decision attribute (MCDA in selecting contractors has the advantage of rendering subjective and implicit decision making more objective and transparent. An additional merit of fuzzy MCDA is the ability to accommodate quantitative and qualitative information. In this paper, an integrated VIKOR–AHP methodology is proposed to make a selection among the alternative contractors in one of Iranian construction industry projects. In the proposed methodology, the weights of the selection criteria are determined by fuzzy pairwise comparison matrices of AHP.

  7. 48 CFR 836.501 - Performance of work by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance of work by the... Performance of work by the contractor. The contracting officer shall insert the clause at 852.236-72, Performance of work by the contractor, in solicitations and contracts for construction that contain the FAR...

  8. 48 CFR 9.308-1 - Testing performed by the contractor.

    Science.gov (United States)

    2010-10-01

    ... the contractor. (a)(1) The contracting officer shall insert the clause at 52.209-3, First Article... it is intended that the contract require (i) first article approval and (ii) that the contractor be... produce the first article and the production quantity at the same facility, the contracting officer shall...

  9. 76 FR 37353 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Business Ethics Compliance...

    Science.gov (United States)

    2011-06-27

    ...; Submission for OMB Review; Contractor Business Ethics Compliance Program and Disclosure Requirements AGENCIES... contractor business ethics compliance program and disclosure requirements. Public comments are particularly... Information Collection 9000- 0164, Contractor Business Ethics Compliance Program and Disclosure Requirements...

  10. 48 CFR 36.501 - Performance of work by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Performance of work by the... Performance of work by the contractor. (a) To assure adequate interest in and supervision of all work involved... contracting officer shall insert the clause at 52.236-1, Performance of Work by the Contractor, in...

  11. 76 FR 73564 - Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration

    Science.gov (United States)

    2011-11-29

    ... Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration AGENCIES... Procurement Data System (FPDS). Additionally, changes are proposed for the clauses requiring contractor registration in the Central Contractor Registration (CCR) database and DUNS number reporting. DATES: Interested...

  12. Farm Building Contractors and Manufacturers: Their Role in Midwest Farm Construction

    Science.gov (United States)

    Lyle Solverson; David C. Baumgartner

    1974-01-01

    Describes and analyzes the activities of farm building contractors and manufacturers in Illinois, Indiana, Iowa, and Missouri. Contractors and manufacturers are setting the trend in the farm building market in terms of building type and size and materials used.

  13. 5 CFR 1320.5 - General requirements.

    Science.gov (United States)

    2010-01-01

    ... received under § 1320.8(d) and § 1320.11; (iii) Submitted to the Director, in accordance with such... provide for any payment or gift to respondents, other than remuneration of contractors or grantees; (E) A... agency has obtained from the Director a control number to be displayed upon the collection of information...

  14. 77 FR 14490 - Defense Federal Acquisition Regulation Supplement: Alleged Crimes By or Against Contractor...

    Science.gov (United States)

    2012-03-12

    ... Federal Acquisition Regulation Supplement: Alleged Crimes By or Against Contractor Personnel (DFARS Case... (DFARS) to expand coverage on contractor requirements and responsibilities relating to alleged crimes by or against contractor personnel. DATES: Comment Date: Comments on the proposed rule should be...

  15. Operator/contractor relationships

    International Nuclear Information System (INIS)

    Smith, J.R.; Kidwell, C.K.; Unger, V.E.; Fercho, E.; Helmer, C.M.

    1992-01-01

    In May 1988, Shell Western E and P Inc. (SWEPI) and partners Elf Aquitaine Petroleum and Conoco Inc. signed a letter of intent with Canadian Marine Drilling Ltd. (Canmar) for provision of exploratory drilling and marine services on leases in OCS Lease Sale 109 in the Chukchi Sea, Alaska. The 5450 blocks offered in the remote sale area west of Point Barrow ranged from 3 to 240 miles (5 to 380 km) offshore in water depths from 26 to 263 feet (8 to 80 m). The principal interest tracts were at least 75 miles (120 km) offshore and north of 70 degrees N latitude. The remoteness and total lack of any oilfield infrastructure required considerable planning and coordination between Operator and Contractor in order to carry out the three-year drilling program efficiently and safely in an environmentally harsh and, at the same time, sensitive area. SWEPI and Canmar developed a close working relationship from the start of the project through a number of participative approaches to the problems that had to be solved. This paper reports that these included strong reliance on operational planning meetings, post-season analyses, and an overall emphasis on the teamwork required of both parties to carry out the first-ever drilling program in the Chukchi Sea. This approach led to a very successful operation for both parties and emphasizes the positive benefits achievable when Operator and Contractor work as a team

  16. 77 FR 59339 - Contractor Qualifications

    Science.gov (United States)

    2012-09-27

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 209 Contractor Qualifications CFR Correction In Title 48 of the Code of Federal Regulations, Chapter 2 (Parts 201-299), revised as of October 1, 2011, on page 55, in section 209.104-70, paragraph (a) is amended by revising the...

  17. PROCEEDINGS OF RIKEN BNL RESEARCH CENTER WORKSHOP ON RHIC SPIN PHYSICS III AND IV, POLARIZED PARTONS AT HIGH Q2 REGION (VOLUME 31)

    International Nuclear Information System (INIS)

    BUNCE, G.; VIGDOR, S.

    2001-01-01

    International workshop on II Polarized Partons at High Q2 region 11 was held at the Yukawa Institute for Theoretical Physics, Kyoto University, Kyoto, Japan on October 13-14, 2000, as a satellite of the international conference ''SPIN 2000'' (Osaka, Japan, October 16-21,2000). This workshop was supported by RIKEN (The Institute of Physical and Chemical Research) and by Yukawa Institute. The scientific program was focused on the upcoming polarized collider RHIC. The workshop was also an annual meeting of RHIC Spin Collaboration (RSC). The number of participants was 55, including 28 foreign visitors and 8 foreign-resident Japanese participants, reflecting the international nature of the RHIC spin program. At the workshop there were 25 oral presentations in four sessions, (1) RHIC Spin Commissioning, (2) Polarized Partons, Present and Future, (3) New Ideas on Polarization Phenomena, (4) Strategy for the Coming Spin Running. In (1) the successful polarized proton commissioning and the readiness of the accelerator for the physics program impressed us. In (2) and (3) active discussions were made on the new structure function to be firstly measured at RHIC, and several new theoretical ideas were presented. In session (4) we have established a plan for the beam time requirement toward the first collision of polarized protons. These proceedings include the transparencies presented at the workshop. The discussion on ''Strategy for the Coming Spin Running'' was summarized by the chairman of the session, S. Vigdor and G. Bunce

  18. Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-06-01

    Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of the program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment

  19. Proceedings of the 1987 coatings for advanced heat engines workshop

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    This Workshop was conducted to enhance communication among those involved in coating development for improved heat engine performance and durability. We were fortunate to have Bill Goward review the steady progress and problems encountered along the way in the use of thermal barrier coatings (TBC) in aircraft gas turbine engines. Navy contractors discussed their work toward the elusive goal of qualifying TBC for turbine airfoil applications. In the diesel community, Caterpillar and Cummins are developing TBC for combustion chamber components as part of the low heat rejection diesel engine concept. The diesel engine TBC work is based on gas turbine technology with a goal of more than twice the thickness used on gas turbine engine components. Adoption of TBC in production for diesel engines could justify a new generation of plasma spray coating equipment. Increasing interests in tribology were evident in this Workshop. Coatings have a significant role in reducing friction and wear under greater mechanical loadings at higher temperatures. The emergence of a high temperature synthetic lubricant could have an enormous impact on diesel engine design and operating conditions. The proven coating processes such as plasma spray, electron-beam physical vapor deposition, sputtering, and chemical vapor deposition have shown enhanced capabilities, particularly with microprocessor controls. Also, the newer coating schemes such as ion implantation and cathodic arc are demonstrating intriguing potential for engine applications. Coatings will play an expanding role in higher efficiency, more durable heat engines.

  20. Workshops as a Research Methodology

    Science.gov (United States)

    Ørngreen, Rikke; Levinsen, Karin

    2017-01-01

    This paper contributes to knowledge on workshops as a research methodology, and specifically on how such workshops pertain to e-learning. A literature review illustrated that workshops are discussed according to three different perspectives: workshops as a means, workshops as practice, and workshops as a research methodology. Focusing primarily on…

  1. 78 FR 68060 - Availability of FY 12 Grantee Performance Evaluation Reports for the Eight States of EPA Region 4...

    Science.gov (United States)

    2013-11-13

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9902-81--Region 4] Availability of FY 12 Grantee Performance Evaluation Reports for the Eight States of EPA Region 4 and 17 Local Agencies AGENCY: Environmental... evaluation reports. SUMMARY: EPA's grant regulations require the Agency to evaluate the performance of...

  2. Structured Transition of Wind Tunnel Operations Skills from Government-to Contractor-Managed

    Science.gov (United States)

    Dunn, Steven C.; Schlank, John J.

    2010-01-01

    In 2004, NASA awarded the Research, Operations, Maintenance, and Engineering (ROME) contract at NASA Langley Research Center to a team led by Jacobs Technology, Inc. A key component of the contract was the transitioning of the five large wind tunnel facilities from NASA managed and NASA or NASA/contractor workforces to fully contractor operated. The contractor would manage daily operations while NASA would continue to develop long-term strategies, make decisions regarding commitment of funds and commitment of facilities, and provide oversight of the contractor's performance. A major challenge would be the transition of knowledge of facility operations and maintenance from the incumbent civil servant workforce to the contractor workforce. While the contract has since been modified multiple times, resulting in a blended NASA/ROME workforce across the facilities, the processes developed and implemented to capture and document facility knowledge from the incumbent subject matter experts, build training and certification programs, and grow individual skills across subject areas and across facilities, are worthy of documentation. This is the purpose of this paper.

  3. 48 CFR 1845.7101-5 - Contractor's privileged financial and business information.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor's privileged financial and business information. 1845.7101-5 Section 1845.7101-5 Federal Acquisition Regulations System... 1845.7101-5 Contractor's privileged financial and business information. If a transfer of property...

  4. 77 FR 10461 - Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor Excise...

    Science.gov (United States)

    2012-02-22

    ... Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor Excise Tax AGENCIES.... Additionally, the law stipulates that no funds are to be disbursed to any foreign contractor in order to... payment. Additionally, the law stipulates that no funds are to be disbursed to any foreign contractor in...

  5. MOOC Design Workshop

    DEFF Research Database (Denmark)

    Nørgård, Rikke Toft; Mor, Yishay; Warburton, Steven

    2016-01-01

    For the last two years we have been running a series of successful MOOC design workshops. These workshops build on previous work in learning design and MOOC design patterns. The aim of these workshops is to aid practitioners in defining and conceptualising educational innovations (predominantly......, but not exclusively MOOCs) which are based on an empathic user-centered view of the target learners and teachers. In this paper, we share the main principles, patterns and resources of our workshops and present some initial results for their effectiveness...

  6. Joint US Geological Survey, US Nuclear Regulatory Commission workshop on research related to low-level radioactive waste disposal, May 4-6, 1993, National Center, Reston, Virginia; Proceedings

    Science.gov (United States)

    Stevens, Peter R.; Nicholson, Thomas J.

    1996-01-01

    This report contains papers presented at the "Joint U.S. Geological Survey (USGS) and U.S. Nuclear Regulatory Commission (NRC) Technical Workshop on Research Related to Low-Level Radioactive Waste (LLW) Disposal" that was held at the USGS National Center Auditorium, Reston, Virginia, May 4-6, 1993. The objective of the workshop was to provide a forum for exchange of information, ideas, and technology in the geosciences dealing with LLW disposal. This workshop was the first joint activity under the Memorandum of Understanding between the USGS and NRC's Office of Nuclear Regulatory Research signed in April 1992.Participants included invited speakers from the USGS, NRC technical contractors (U.S. Department of Energy (DOE) National Laboratories and universities) and NRC staff for presentation of research study results related to LLW disposal. Also in attendance were scientists from the DOE, DOE National Laboratories, the U.S. Environmental Protection Agency, State developmental and regulatory agencies involved in LLW disposal facility siting and licensing, Atomic Energy Canada Limited (AECL), private industry, Agricultural Research Service, universities, USGS and NRC.

  7. Processing needs and methodology for wastewaters from the conversion of coal, oil shale, and biomass to synfuels

    Energy Technology Data Exchange (ETDEWEB)

    1980-05-01

    The workshop identifies needs to be met by processing technology for wastewaters, and evaluates the suitability, approximate costs, and problems associated with current technology. Participation was confined to DOE Environmental Control Technology contractors to pull together and integrate past wastewater-related activities, to assess the status of synfuel wastewater treatability and process options, and to abet technology transfer. Particular attention was paid to probable or possible environmental restrictions which cannot be economically met by present technology. Primary emphasis was focussed upon process-condensate waters from coal-conversion and shale-retorting processes. Due to limited data base and time, the workshop did not deal with transients, upsets, trade-offs and system optimization, or with solids disposal. The report is divided into sections that, respectively, survey the water usage and effluent situation (II); identify the probable and possible water-treatment goals anticipated at the time when large-scale plants will be constructed (III); assess the capabilities, costs and shortcomings of present technology (IV); explore particularly severe environmental-control problems (V); give overall conclusions from the Workshop and recommendations for future research and study (VI); and, finally, present Status Reports of current work from participants in the Workshop (VII).

  8. 76 FR 52378 - Privacy Act; System of Records: State-76, Personal Services Contractor Records

    Science.gov (United States)

    2011-08-22

    ... Services Contractor Records SUMMARY: Notice is hereby given that the Department of State proposes to create a new system of records, Personal Services Contractor Records, State-76, pursuant to the provisions... July 20, 2011. It is proposed that the new system be named ``Personal Services Contractor Records.'' It...

  9. 48 CFR 225.7303-1 - Contractor sales to other foreign customers.

    Science.gov (United States)

    2010-10-01

    ... foreign customers. 225.7303-1 Section 225.7303-1 Federal Acquisition Regulations System DEFENSE... for Foreign Military Sales 225.7303-1 Contractor sales to other foreign customers. If the contractor has made sales of the item required for the foreign military sale to foreign customers under...

  10. 20 CFR 668.700 - What process must an INA grantee use to plan its employment and training services?

    Science.gov (United States)

    2010-04-01

    ... it uses to plan other activities and services. (b) However, in the process of preparing its Two Year... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What process must an INA grantee use to plan its employment and training services? 668.700 Section 668.700 Employees' Benefits EMPLOYMENT AND...

  11. How Loud Is Too Loud?

    Medline Plus

    Full Text Available ... Extramural Research Intramural Research Scientific Workshop and Meeting Reports Meet NIDCD Scientists and Grantees Research Resources Clinical ... changes brain function, study finds: Early damage could open door to dementia, lead author says ( 5/22/ ...

  12. 77 FR 12313 - Food Labeling Workshop; Public Workshop

    Science.gov (United States)

    2012-02-29

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2012-N-0001] Food Labeling Workshop; Public Workshop AGENCY: Food and Drug Administration, HHS. ACTION: Notice of... District Office (DALDO), in collaboration with Oklahoma State University (OSU), Robert M. Kerr Food...

  13. 75 FR 29775 - Food Labeling Workshop; Public Workshop

    Science.gov (United States)

    2010-05-27

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES [Docket No. FDA-2010-N-0001] Food and Drug Administration Food Labeling Workshop; Public Workshop AGENCY: Food and Drug Administration, HHS. ACTION: Notice of...: Institute of Food Science & Engineering, University of Arkansas, 2650 North Young Ave., Fayetteville, AR...

  14. Development and validation of a strategic repositioning model for defense and aerospace contractors

    Science.gov (United States)

    Bers, John A.

    Strategic repositioning refers to the organized efforts of defense contractors to "reposition" a technology that they have developed for a defense sector customer into a civilian or commercial market. The strategic repositioning model developed here is a structural model: it seeks to isolate the factors that influence choice of strategy, which in turn influences the organization's performance. The model draws from the prior experience of contractors (through interviews and surveys) and companies in other sectors (through a review of the relevant published research). (1) Over all, the model accounted for 55% of the variance in financial performance of the sample and 35% for the underlying population. (2) Key success factors include a rigorous planning process, a target market in the growth (vs. incubation) stage, a priority on market leadership as well as financial return, the ability to operate in an ambiguous business environment, and a relatively short time horizon but strong corporate support. (3) The greatest challenges that a contractor is likely to encounter are understanding his new customers' buying practices, strong competition, and adapting his technology to their needs and price expectations. (4) To address these issues contractors often involve partners in their entry strategy, but partnerships of equals tend to be more difficult to bring off than direct entry strategies. (5) The two major target market categories--government and commercial--present different challenges. Commercial customers are more likely to resist doing business with the contractor, while contractors entering government and other noncommercial markets are more likely to encounter price resistance, low technical sophistication among customers, and difficulties reaching their customer base. (6) Despite these differences across markets, performance is not influenced by the target market category, nor by the type of product or service or the contractor's functional orientation (marketing

  15. Systems Engineering Workshops | Wind | NREL

    Science.gov (United States)

    Workshops Systems Engineering Workshops The Wind Energy Systems Engineering Workshop is a biennial topics relevant to systems engineering and the wind industry. The presentations and agendas are available for all of the Systems Engineering Workshops: The 1st NREL Wind Energy Systems Engineering Workshop

  16. 76 FR 13423 - Notice of Submission of Proposed Information Collection to OMB; Contractor's Requisition-Project...

    Science.gov (United States)

    2011-03-11

    ... Proposed Information Collection to OMB; Contractor's Requisition--Project Mortgages AGENCY: Office of the.... Contractor's monthly application for distribution of insured mortgage proceeds for construction costs... Following Information Title of Proposal: Contractor's Requisition--Project Mortgages. OMB Approval Number...

  17. Private security and military contractors: A troubling oversight

    DEFF Research Database (Denmark)

    Swed, Ori; Crosbie, Thomas Alexander

    2017-01-01

    Though private military and security companies (PMSCs) have been addressed extensively in the literature, little research has been done on the contractors themselves, leaving us in the dark as to who these individuals are. In this article, we focus on the critical case of the United States armed...... and concomitant evolution of the security sector, while noting a new trend that points to the need for moving from the macrosocial to the microsocial level of inquiry. Second, we indicate the challenges contractors pose to the sociological paradigm of military professionalism: These suggest a need to move from...

  18. Contractor Past Performance - Are We There Yet?

    National Research Council Canada - National Science Library

    Guerrero, Juan

    2001-01-01

    During the United States federal government acquisition reform movement of the 1990s, the government strongly emphasized the use of past performance information to select contractors in federal procurements...

  19. DOE contractor's meeting on chemical toxicity

    Energy Technology Data Exchange (ETDEWEB)

    1987-01-01

    The Office of Health and Environmental Research (OHER) is required to determine the potential health and environmental effects associated with energy production and use. To ensure appropriate communication among investigators and scientific disciplines that these research studies represent, OHER has sponsored workshops. This document provides a compilation of activities at the Third Annual DOE/OHER Workshop. This year's workshop was broadened to include all OHER activities identified as within the chemical effects area. The workshop consisted of eight sessions entitled Isolation and Detection of Toxic chemicals; Adduct Formation and Repair; Chemical Toxicity (Posters); Metabolism and Genotoxicity; Inhalation Toxicology; Gene Regulation; Metals Toxicity; and Biological Mechanisms. This document contains abstracts of the information presented by session.

  20. 78 FR 64499 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Use of Interagency Fleet...

    Science.gov (United States)

    2013-10-29

    ...; Submission for OMB Review; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department... previously approved information collection requirement concerning contractor use of interagency fleet... comments identified by Information Collection 9000- 0032, Contractor Use of Interagency Fleet Management...

  1. Improving UK client-contractor relations

    International Nuclear Information System (INIS)

    Brant, A.W.

    1996-01-01

    The client's aim in any decommissioning project is that the originally intended end point is achieved, within budget and on time. The contractor's aim is to have a satisfied client, so that both are happy to work together again, and to have a reasonable return for his efforts. How can these - not incompatible - aims best be achieved? (UK)

  2. Applied antineutrino physics workshop

    International Nuclear Information System (INIS)

    Lund, James C.

    2008-01-01

    This workshop is the fourth one of a series that includes the Neutrino Geophysics Conference at Honolulu, Hawaii, which I attended in 2005. This workshop was organized by the Astro-Particle and Cosmology laboratory in the recently opened Condoret building of the University of Paris. More information, including copies of the presentations, on the workshop is available on the website: www.apc.univ-paris7.fr/AAP2007/. The workshop aims at opening neutrino physics to various fields such that it can be applied in geosciences, nuclear industry (reactor and spent fuel monitoring) and non-proliferation. The workshop was attended by over 60 people from Europe, USA, Asia and Brazil. The meeting was also attended by representatives of the Comprehensive nuclear-Test Ban Treaty (CTBT) and the International Atomic Energy Agency (IAEA). The workshop also included a workshop dinner on board of a river boat sailing the Seine river

  3. 75 FR 10267 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Use of Interagency Motor...

    Science.gov (United States)

    2010-03-05

    ... ADMINISTRATION [OMB Control No. 9000-0032] Federal Acquisition Regulation; Submission for OMB Review; Contractor... previously approved information collection requirement concerning contractor use of interagency motor pool... contracting officer may authorize cost-reimbursement contractors to obtain, for official purposes only...

  4. 77 FR 63835 - Office of the Chief Information Officer; Submission for OMB Review; Temporary Contractor...

    Science.gov (United States)

    2012-10-17

    ... of the Chief Information Officer; Submission for OMB Review; Temporary Contractor Information... information collection requirement regarding temporary contractor information worksheet. A notice was... for temporary contractors as a result of the American Recovery and Reinvestment Act of 2009 (Public...

  5. institutional and resource constraints that inhibit contractor ...

    African Journals Online (AJOL)

    p2333147

    Keywords: Institutions; small-scale contractor performance; sugar industry. ABSTRACT ..... diverse cultural settings, women, specifically widowed or single women, have a .... constraints on business growth, such as the work limitations placed.

  6. CONTRACTORS OF SOCIALIZATION AND THEIR INFLUENCE ON SOCIAL PROCESSES

    OpenAIRE

    Mikhail Yu. POPOV

    2016-01-01

    This article is devoted to the analysis of an essence of the concept "contractors of socialization" and attempt of definition of its place in structure of sociological knowledge. During the solution of this task the author seeks to define destructive nature of influence of contractors of socialization on formation of the personality both at a stage of primary socialization, and in the course of the entire period of its activity. Inclusion of this term in structure of sociological knowledge, a...

  7. 78 FR 13547 - Defense Federal Acquisition Regulation Supplement: Alleged Crimes By or Against Contractor Personnel

    Science.gov (United States)

    2013-02-28

    ... Contractor Personnel AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION... (FY) 2009 and expand coverage on contractor requirements and responsibilities relating to alleged crimes by or against contractor personnel. DATES: Effective February 28, 2013. FOR FURTHER INFORMATION...

  8. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1990-10-01

    A fundamental premise of the Nuclear Regulatory Commission's (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The total government-industry system for the inspection of commercial nuclear facilities has been designed to provide for multiple levels of inspection and verification. Licensees, contractors, and vendors each participate in a quality verification process in compliance with requirements prescribed by the NRC's rules and regulations (Title 10 Code of Federal Regulations). The NRC performs an overview of the commercial nuclear industry by inspection to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of ongoing quality verification programs

  9. 78 FR 6189 - Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor Excise...

    Science.gov (United States)

    2013-01-29

    ... 9000-AM13 Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor... contractor in order to reimburse the tax imposed (26 U.S.C. 5000C Note). On February 22, 2012, DoD, GSA, and... with the statute, FAR 31.205-41 is amended to inform the Government and contractors that the costs of...

  10. Hepatic imaging in stage IV-S neuroblastoma

    International Nuclear Information System (INIS)

    Franken, E.A. Jr.; Smith, W.L.; Iowa Univ., Iowa City; Cohen, M.D.; Kisker, C.T.; Platz, C.E.

    1986-01-01

    Stage IV-S neuroblastoma describes a group of infants with tumor spread limited to liver, skin, or bone marrow. Such patients, who constitute about 25% of affected infants with neuroblastoma, may expect spontaneous tumor remission. We report 18 infants with Stage IV-S neuroblastoma, 83% of whom had liver involvement. Imaging investigations included Technetium 99m sulfur colloid scan, ultrasound, and CT. Two patterns of liver metastasis were noted: ill-defined nodules or diffuse tumor throughout the liver. Distinction of normal and abnormal liver with diffuse type metastasis could be quite difficult, particularly with liver scans. We conclude that patients with Stage IV-S neuroblastoma have ultrasound or CT examination as an initial workup, with nuclear medicine scans reserved for followup studies. (orig.)

  11. International Markets: Malaysian Construction Contractors and the Stage Theory

    Directory of Open Access Journals (Sweden)

    Ahmed Awil

    2012-11-01

    Full Text Available Reduced demand for services, lack of finances for projects and idle resources at homehave resulted in loss of business for Malaysian construction contractors. Among the optionsthat are explored in this paper is internationalisation of services to help the contractorsgainfully employ their resources and diversify their markets. Integration of worldmarkets, faster transportation and improved means of communication have made it possiblefor contractors to undertake work in international markets. It was found that contractorswere motivated to internationalise by need to make the firm a viable one byconsidering the long-term profitability. Reputation and size of the firm were found to befactors that help contractors in winning contracts overseas. Most non-exporters were concernedwith provision of market intelligence and export credit finance. It was found thatproviding relevant market information, accessible to both exporter and non-exporters, canhelp firms make informed decisions. Any assistance provided should match the firm to thestage the firm has reached in exporting

  12. Government/contractor partnerships for continuous improvement. A Goddard Space Flight Center example

    Science.gov (United States)

    Tagler, Richard C.

    1992-01-01

    The efforts of a government organization and its major contractors to foster a continuous improvement environment which transcends the traditional government/contractor relationship is discussed. This relationship is aimed at communication, partnership, and trust - creating benefits for all involved.

  13. 77 FR 20051 - Notice of Final Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2012-04-03

    ... Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor Pursuant to... ``Procedural Guidelines for the Maintenance of the List of Products Requiring Federal Contractor Certification... List of Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor...

  14. 75 FR 28771 - Federal Acquisition Regulation; FAR Case 2009-027, Personal Identity Verification of Contractor...

    Science.gov (United States)

    2010-05-24

    ... Acquisition Regulation; FAR Case 2009-027, Personal Identity Verification of Contractor Personnel AGENCIES... of collecting from contractors all forms of Government provided identification once they are no..., titled Controls Over the Contractor Common Access Card (CAC) Life Cycle, was performed to determine...

  15. 77 FR 65927 - 60-Day Notice of Proposed Information Collection: Office of Language Services Contractor...

    Science.gov (United States)

    2012-10-31

    ... of Language Services Contractor Application Form ACTION: Notice of request for public comment... Collection: Office of Language Services Contractor Application Form. OMB Control Number: 1405-0191. Type of... become contractors for the U.S. Department of State, Office of Language Services, the information...

  16. 78 FR 13394 - 30-Day Notice of Proposed Information Collection: Office of Language Services Contractor...

    Science.gov (United States)

    2013-02-27

    ... of Language Services Contractor Application Form ACTION: Notice of request for public comment and...: Title of Information Collection: Office of Language Services Contractor Application Form. OMB Control... States. If candidates successfully become contractors for the U.S. Department of State, Office of...

  17. Peer-Review Writing Workshops in College Courses: Students’ Perspectives about Online and Classroom Based Workshops

    Directory of Open Access Journals (Sweden)

    Erin B. Jensen

    2016-11-01

    Full Text Available Peer-review workshops are commonly used in writing courses as a way for students to give their peers feedback as well as help their own writing. Most of the research on peer-review workshops focuses on workshops held in traditional in-person courses, with less research on peer-review workshops held online. Students in a freshman writing course experienced both a classroom based writing workshop and an online workshop and then took a survey about their experiences. The majority of the students preferred the online writing workshop because of the convenience of the workshop and being able to post anonymous reviews. Students whom preferred the traditional in-person writing workshop liked being able to talk with their peers about their papers. This research article focuses on the students’ responses and experiences with traditional and online peer-reviews.

  18. 42 CFR 405.1012 - When CMS or its contractors may be a party to a hearing.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false When CMS or its contractors may be a party to a... Hearings § 405.1012 When CMS or its contractors may be a party to a hearing. (a) CMS and/or one or more of... unrepresented beneficiary. (b) CMS and/or the contractor(s) advises the ALJ, appellant, and all other parties...

  19. ICP-MS Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Carman, April J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Eiden, Gregory C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-11-01

    This is a short document that explains the materials that will be transmitted to LLNL and DNN HQ regarding the ICP-MS Workshop held at PNNL June 17-19th. The goal of the information is to pass on to LLNL information regarding the planning and preparations for the Workshop at PNNL in preparation of the SIMS workshop at LLNL.

  20. Assessing Contractor Capabilities for Streamlined Site Investigations

    Science.gov (United States)

    The purpose of this document is to familiarize and encourage brownfields decision makers to investigate and employ innovative methods for characterizing their sites, to assist brownfields decision makers in assessing contractors' capabilities.

  1. 78 FR 33849 - Battery-Powered Medical Devices Workshop: Challenges and Opportunities; Public Workshop; Request...

    Science.gov (United States)

    2013-06-05

    ... after the public workshop on the Internet at http://www.fda.gov/MedicalDevices/NewsEvents/Workshops..., compact, and mobile, the number of battery-powered medical devices will continue to increase. While many...] Battery-Powered Medical Devices Workshop: Challenges and Opportunities; Public Workshop; Request for...

  2. 76 FR 31365 - Notice of Final Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2011-05-31

    ... List of Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor... Contractor Certification as to Forced or Indentured Child Labor.'' This notice adds a product, hand-woven... of the List of Products Requiring Federal Contractor Certification as to Forced or Indentured Child...

  3. Thermodynamic data for predicting concentrations of Th(IV), U(IV), Np(IV), and Pu(IV) in geologic environments

    Energy Technology Data Exchange (ETDEWEB)

    Rai, Dhanpat; Roa, Linfeng; Weger, H.T.; Felmy, A.R. [Battelle, Pacific Northwest National Laboratory (PNNL) (United States); Choppin, G.R. [Florida State University (United States); Yui, Mikazu [Waste Isolation Research Division, Tokai Works, Japan Nuclear Cycle Development Inst., Tokai, Ibaraki (Japan)

    1999-01-01

    This report provides thermodynamic data for predicting concentrations of Th(IV), U(IV), Np(IV), and Pu(IV) in geologic environments, and contributes to an integration of the JNC chemical thermodynamic database, JNC-TDB (previously PNC-TDB), for the performance analysis of geological isolation system for high-level radioactive wastes. Thermodynamic data for the formation of complexes or compounds with hydroxide, chloride, fluoride, carbonate, nitrate, sulfate and phosphate are discussed in this report. Where data for specific actinide(IV) species was lacking, the data were selected based on chemical analogy to other tetravalent actinides. In this study, the Pitzer ion-interaction model is used to extrapolate thermodynamic constants to zero ionic strength at 25degC. (author)

  4. Safety-Related Contractor Activities at Nuclear Power Plants. New Challenges for Regulatory Oversight

    International Nuclear Information System (INIS)

    Chockie, Alan

    2005-09-01

    The use of contractors has been an integral and important part of the design, construction, operation, and maintenance of nuclear power plants. To ensure the safe and efficient completion of contracted tasks, each nuclear plant licensee has developed and refined formal contract management processes to meet their specific needs and plant requirements. Although these contract management processes have proven to be effective tools for the procurement of support and components tailored to the needs of nuclear power plants, contractor-related incidents and accidents have revealed some serious weaknesses with the implementation of these processes. Identifying and addressing implementation problems are becoming more complicated due to organizational and personnel changes affecting the nuclear power industry. The ability of regulators and licensees to effectively monitor and manage the safety-related performance of contractors will likely be affected by forthcoming organization and personnel changes due to: the aging of the workforce; the decline of the nuclear industry; and the deregulation of nuclear power. The objective of this report is to provide a review of current and potential future challenges facing safety-related contractor activities at nuclear power plants. The purpose is to assist SKI in establishing a strategy for the proactive oversight of contractor safety-related activities at Swedish nuclear power plants and facilities. The nature and role of contractors at nuclear plants is briefly reviewed in the first section of the report. The second section describes the essential elements of the contract management process. Although organizations have had decades of experience with the a contract management process, there remain a number of common implantation weaknesses that have lead to serious contractor-related incidents and accidents. These implementation weaknesses are summarized in the third section. The fourth section of the report highlights the

  5. Safety-Related Contractor Activities at Nuclear Power Plants. New Challenges for Regulatory Oversight

    Energy Technology Data Exchange (ETDEWEB)

    Chockie, Alan [Chockie Group International, Inc., Seattle, WA (United States)

    2005-09-15

    The use of contractors has been an integral and important part of the design, construction, operation, and maintenance of nuclear power plants. To ensure the safe and efficient completion of contracted tasks, each nuclear plant licensee has developed and refined formal contract management processes to meet their specific needs and plant requirements. Although these contract management processes have proven to be effective tools for the procurement of support and components tailored to the needs of nuclear power plants, contractor-related incidents and accidents have revealed some serious weaknesses with the implementation of these processes. Identifying and addressing implementation problems are becoming more complicated due to organizational and personnel changes affecting the nuclear power industry. The ability of regulators and licensees to effectively monitor and manage the safety-related performance of contractors will likely be affected by forthcoming organization and personnel changes due to: the aging of the workforce; the decline of the nuclear industry; and the deregulation of nuclear power. The objective of this report is to provide a review of current and potential future challenges facing safety-related contractor activities at nuclear power plants. The purpose is to assist SKI in establishing a strategy for the proactive oversight of contractor safety-related activities at Swedish nuclear power plants and facilities. The nature and role of contractors at nuclear plants is briefly reviewed in the first section of the report. The second section describes the essential elements of the contract management process. Although organizations have had decades of experience with the a contract management process, there remain a number of common implantation weaknesses that have lead to serious contractor-related incidents and accidents. These implementation weaknesses are summarized in the third section. The fourth section of the report highlights the

  6. Workshop Proceedings

    DEFF Research Database (Denmark)

    2012-01-01

    , the main focus there is on spoken languages in their written and spoken forms. This series of workshops, however, offers a forum for researchers focussing on sign languages. For the third time, the workshop had sign language corpora as its main topic. This time, the focus was on the interaction between...... corpus and lexicon. More than half of the papers presented contribute to this topic. Once again, the papers at this workshop clearly identify the potentials of even closer cooperation between sign linguists and sign language engineers, and we think it is events like this that contribute a lot to a better...

  7. Proceedings of the workshop on radioactive, hazardous, and/or mixed waste sludge management

    International Nuclear Information System (INIS)

    Lomenick, T.F.

    1992-01-01

    A workshop sponsored by the US Department of Energy (DOE) Field Office, Oak Ridge, was held on December 4--6, 1990, in Knoxville, Tennessee. The primary objective of the workshop was the exchange of information, experiences, solutions, and future plans of DOE and its prime contractors who are engaged in work on the packaging, grouting, storage, and transport of waste sludges. In addition, the group met with industrial participants in an open forum to discuss problems and needs in the management of these wastes and to learn of possible industrial experiences, approaches, and solutions, including demonstrations of potential tools and techniques. Topics discussed include the following: mixed waste sludge issue at the K-25 site; processing saltstone from waste streams at the Savannah River Plant; the Hanford Grout Treatment Facility; treatment of pond sludge at the Rocky Flats Plant; cement solidification of low-level radioactive sludge at the West Valley Demonstration Project; studies on the solidification of low-level radioactive wastes in cement at INEL; cement solidification systems at Los Alamos National Laboratory; emergency avoidance solidification campaign at ORNL; diffusion plant sludge storage problems at the Portsmouth Gaseous Diffusion Plant; the proposed fixation of sludge in cement at the feed materials production center; regulatory aspects of sludge management; and delisting efforts for K-1407-C pond sludges. Individual projects are processed separately for the data bases

  8. 34 CFR 611.51 - How does a grantee ensure that a scholarship recipient understands the terms and conditions of...

    Science.gov (United States)

    2010-07-01

    ... the recipient will need to have the LEA provide to the Department to enable the Secretary to confirm... 34 Education 3 2010-07-01 2010-07-01 false How does a grantee ensure that a scholarship recipient understands the terms and conditions of the scholarship before the recipient leaves the teacher preparation...

  9. Workshop report

    African Journals Online (AJOL)

    abp

    2017-09-14

    Sep 14, 2017 ... health: report of first EQUIST training workshop in Nigeria .... The difference between the before and after measurements was ... After the administration of the pre-workshop questionnaire the ... represent Likert rating scale of 1-5 points, where 1point = grossly .... Procedures Manual for the "Evaluating.

  10. About the structure and stability of complex carbonates of thorium (IV), cerium (IV), zirconium (IV), hafnium (IV)

    International Nuclear Information System (INIS)

    Dervin, Jacqueline

    1972-01-01

    This research thesis addressed the study of complex carbonates of cations of metals belonging to the IV A column, i.e. thorium (IV), zirconium (IV), hafnium (IV), and also cerium (IV) and uranium (VI), and more particularly focused on ionic compounds formed in solution, and also on the influence of concentration and nature of cations on stability and nature of the formed solid. The author first presents methods used in this study, discusses their precision and scope of validity. She reports the study of the formation of different complex ions which have been highlighted in solution, and the determination of their formation constants. She reports the preparation and study of the stability domain of solid complexes. The next part reports the use of thermogravimetric analysis, IR spectrometry, and crystallography for the structural study of these compounds

  11. Operations Strategy and –Innovation? -A Contractor Implementing Lean

    DEFF Research Database (Denmark)

    Koch, Christian; Simonsen, Rolf

    2006-01-01

    Traditional strategic management and operations strategy wants us to believe that the implementation of management concepts is a simple strategic choice made by top managers. In this paper we introduce the story of Lean Construction entering into the organisation of a Danish contractor. Lean...... concepts. The paper presents findings from empirical work in collaboration with a large Danish contractor. The case is analysed from the perspective of operation strategy and political process. It is observed how the management concept is socially constructed and negotiated through political action of key...

  12. The ENEN-III project: Technical Training on the Concepts and Design of GEN IV nuclear reactors

    International Nuclear Information System (INIS)

    Berkvens, T.; Renault, C.; Alonso, M.; Salomaa, R.; Schönfelder, C.

    2013-01-01

    Some conclusions: • Not enough training courses to cover the LO’s: – Especially GEN IV; – Many introductory courses, little specific courses; – Reach out to other partners for more courses. • Skills and Attitudes: – Much more difficult to train/measure; – To be treated in a separate project. • Use of Learning Outcomes must be promoted; • Involvement of human resources necessary for the successful implementation of the schemes: – End of project workshop

  13. 77 FR 35883 - Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security...

    Science.gov (United States)

    2012-06-15

    .... The essence of the definition cannot be changed substantially in the DFARS from that in the... recommended that the final rule define the contractor's obligation to cooperate, as in the mandatory... define the scope and limitations of the contractor's obligation to cooperate with Government...

  14. 29 CFR 471.16 - Under what circumstances may a contractor be reinstated?

    Science.gov (United States)

    2010-07-01

    ..., DEPARTMENT OF LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS General Enforcement... 29 Labor 2 2010-07-01 2010-07-01 false Under what circumstances may a contractor be reinstated...

  15. Workshops as a Research Methodology

    DEFF Research Database (Denmark)

    Ørngreen, Rikke; Levinsen, Karin Tweddell

    2017-01-01

    , and workshops as a research methodology. Focusing primarily on the latter, this paper presents five studies on upper secondary and higher education teachers’ professional development and on teaching and learning through video conferencing. Through analysis and discussion of these studies’ findings, we argue......This paper contributes to knowledge on workshops as a research methodology, and specifically on how such workshops pertain to e-learning. A literature review illustrated that workshops are discussed according to three different perspectives: workshops as a means, workshops as practice...... that workshops provide a platform that can aid researchers in identifying and exploring relevant factors in a given domain by providing means for understanding complex work and knowledge processes that are supported by technology (for example, e-learning). The approach supports identifying factors...

  16. 48 CFR 2945.104 - Review and correction of contractors' property control systems.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Review and correction of... contractors' property control systems. When the Government's property administrator determines that review and... administrator must review the system to determine whether the contractor will be able to meet the requirements...

  17. Examining the Dynamics of Novation from the Principal Contractor's and Architect's Perspectives

    Directory of Open Access Journals (Sweden)

    Alan Griffith

    2012-11-01

    Full Text Available Design and build is a popular form of procurement worldwide. In its conventional form, it is characterised by the integration between design and construction. Novation, a variant of design and build where design responsibility is transferred from designer to contractor as procurement evolves, has gained in popularity. However, the characteristics of the process, although well identified, continue to create confusion and problems for clients and contractors alike. This paper focuses on the dynamics of design and build novation from the principal contractor's and architect's perspectives. It embraces key aspects of both the pre-contract and post-contract environment. Its contribution forms a part of a major UK Government funded research project investigating design and build best practice. The findings presented in this paper broadly indicate that contractors believe novated design and build can be disadvantageous and that considerable fragmentation can be created in what should be an integrated procurement approach.

  18. Risk Management Techniques and Practice Workshop Workshop Report

    Energy Technology Data Exchange (ETDEWEB)

    Quinn, T; Zosel, M

    2008-12-02

    At the request of the Department of Energy (DOE) Office of Science (SC), Lawrence Livermore National Laboratory (LLNL) hosted a two-day Risk Management Techniques and Practice (RMTAP) workshop held September 18-19 at the Hotel Nikko in San Francisco. The purpose of the workshop, which was sponsored by the SC/Advanced Scientific Computing Research (ASCR) program and the National Nuclear Security Administration (NNSA)/Advanced Simulation and Computing (ASC) program, was to assess current and emerging techniques, practices, and lessons learned for effectively identifying, understanding, managing, and mitigating the risks associated with acquiring leading-edge computing systems at high-performance computing centers (HPCCs). Representatives from fifteen high-performance computing (HPC) organizations, four HPC vendor partners, and three government agencies attended the workshop. The overall workshop findings were: (1) Standard risk management techniques and tools are in the aggregate applicable to projects at HPCCs and are commonly employed by the HPC community; (2) HPC projects have characteristics that necessitate a tailoring of the standard risk management practices; (3) All HPCC acquisition projects can benefit by employing risk management, but the specific choice of risk management processes and tools is less important to the success of the project; (4) The special relationship between the HPCCs and HPC vendors must be reflected in the risk management strategy; (5) Best practices findings include developing a prioritized risk register with special attention to the top risks, establishing a practice of regular meetings and status updates with the platform partner, supporting regular and open reviews that engage the interests and expertise of a wide range of staff and stakeholders, and documenting and sharing the acquisition/build/deployment experience; and (6) Top risk categories include system scaling issues, request for proposal/contract and acceptance testing, and

  19. Process waste assessment approach, training and technical assistance for DOE contractors

    International Nuclear Information System (INIS)

    Pemberton, S.

    1994-03-01

    The Department of Energy (DOE) and its contractors are faced with a large waste management problem as are other industries. One of the tools used in a successful waste minimization pollution prevention (WMin/P2) program is a process waste assessment (PWA). The purpose of this project was to share the Kansas City Plant's (KCP's) PWA expertise with other DOE personnel and DOE contractors. This consisted of two major activities: (1) The KCP's PWA graded approach methodology was modified with the assistance of DOE/Defense Program's laboratories, and (2) PWA training and technical assistance were provided to interested DOE personnel and DOE contractors. This report documents the FY93 efforts, lesson learned, and future plans for both PWA-related activities

  20. Excessive Profits of German Defense Contractors

    Science.gov (United States)

    2014-09-01

    its business unit Thyssen Krupp Marine Systems, is a German defense contractor. (2) Tognom AG Tognum AG owned the MTU Friedrichshafen GmbH before... Friedrichshafen provided engines for many ships of the German Navy and for German battle tanks, such as the Leopard I and Leopard II. MTU refers to the

  1. NATO Advanced Research Workshop on Thin Film Growth Techniques for Low-Dimensional Structures

    CERN Document Server

    Parkin, S; Dobson, P; Neave, J; Arrott, A

    1987-01-01

    This work represents the account of a NATO Advanced Research Workshop on "Thin Film Growth Techniques for Low Dimensional Structures", held at the University of Sussex, Brighton, England from 15-19 Sept. 1986. The objective of the workshop was to review the problems of the growth and characterisation of thin semiconductor and metal layers. Recent advances in deposition techniques have made it possible to design new material which is based on ultra-thin layers and this is now posing challenges for scientists, technologists and engineers in the assessment and utilisation of such new material. Molecular beam epitaxy (MBE) has become well established as a method for growing thin single crystal layers of semiconductors. Until recently, MBE was confined to the growth of III-V compounds and alloys, but now it is being used for group IV semiconductors and II-VI compounds. Examples of such work are given in this volume. MBE has one major advantage over other crystal growth techniques in that the structure of the growi...

  2. Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    Ru Liang

    2018-01-01

    Full Text Available The magnitude of business dynamics has increased rapidly due to increased complexity, uncertainty, and risk of large-scale infrastructure projects. This fact made it increasingly tough to “go alone” into a contractor. As a consequence, joint venture contractors with diverse strengths and weaknesses cooperatively bid for bidding. Understanding project complexity and making decision on the optimal joint venture contractor is challenging. This paper is to study how to select joint venture contractors for undertaking large-scale infrastructure projects based on a multiattribute mathematical model. Two different methods are developed to solve the problem. One is based on ideal points and the other one is based on balanced ideal advantages. Both of the two methods consider individual difference in expert judgment and contractor attributes. A case study of Hong Kong-Zhuhai-Macao-Bridge (HZMB project in China is used to demonstrate how to apply these two methods and their advantages.

  3. Workshop meeting

    International Nuclear Information System (INIS)

    Veland, Oeystein

    2004-04-01

    1-2 September 2003 the Halden Project arranged a workshop on 'Innovative Human-System Interfaces and their Evaluation'. This topic is new in the HRP 2003-2005 programme, and it is important to get feedback from member organizations to the work that is being performed in Halden. It is also essential that relevant activities and experiences in this area from the member organizations are shared with the Halden staff and other HRP members. Altogether 25 persons attended the workshop. The workshop had a mixture of presentations and discussions, and was chaired by Dominique Pirus of EDF, France. Day one focused on the HRP/IFE activities on Human-System Interface design, including Function-oriented displays, Ecological Interface Design, Task-oriented displays, as well as work on innovative display solutions for the oil and gas domain. There were also presentations of relevant work in France, Japan and the Czech Republic. The main focus of day two was the verification and validation of human-system interfaces, with presentations of work at HRP on Human-Centered Validation, Criteria-Based System Validation, and Control Room Verification and Validation. The chairman concluded that it was a successful workshop, although one could have had more time for discussions. The Halden Project got valuable feedback and viewpoints on this new topic during the workshop, and will consider all recommendations related to the future work in this area. (Author)

  4. 42 CFR 405.1010 - When CMS or its contractors may participate in an ALJ hearing.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false When CMS or its contractors may participate in an... Hearings § 405.1010 When CMS or its contractors may participate in an ALJ hearing. (a) An ALJ may request, but may not require, CMS and/or one or more of its contractors to participate in any proceedings...

  5. Occupational dose reduction at Department of Energy contractor facilities: Study of ALARA programs

    International Nuclear Information System (INIS)

    Dionne, B.J.; Meinhold, C.B.; Khan, T.A.; Baum, J.W.

    1992-03-01

    This report provides the US Department of Energy (DOE) and its contractors with information that will be useful for reducing occupational radiation doses at DOE's nuclear facilities. In 1989 and 1990, health physicists from the Brookhaven National Laboratory's (BNL) ALARA Center visited twelve DOE contractor facilities with annual collective dose equivalents greater than 100 person-rem (100 person-cSv). The health physicists interviewed radiological safety staff, engineers, and training personnel who were responsible for dose control. The status of ALARA practices at the major contractor facilities was compared with the requirements and recommendation in DOE Order 5480.11 ''Radiation Protection for Occupational Workers'' and PNL-6577 ''Health Physics Manual of Good Practices for Reducing Radiation Exposure to Levels that are as Low as Reasonably Achievable.'' The information and data collected are described and examples of successful practices are presented. The findings on the status of the DOE Contractor ALARA Programs are summarized and evaluated. In addition, the supplement to this report contains examples of good-practice documents associated with implementing the major elements of a formally documented ALARA program for a major DOE contractor facility

  6. Proceedings of the ninth DOE solar photochemistry research conference

    Energy Technology Data Exchange (ETDEWEB)

    1985-01-01

    This meeting brought together contractors and grantees of the Division of Chemical Sciences in its basic research program on solar photochemical energy conversion to exchange information and discuss problems of mutual interest. This volume contains the program of the meeting, the abstracts of 28 formal presentations and 42 posters, a record of questions and answers following each presentation, and a list of attendees.

  7. Factors and values of willingness to pay for improved construction waste management--a perspective of Malaysian contractors.

    Science.gov (United States)

    Begum, Rawshan Ara; Siwar, Chamhuri; Pereira, Joy Jacqueline; Jaafar, Abdul Hamid

    2007-01-01

    Malaysia is facing an increase in the generation of waste and of accompanying problems with the disposal of this waste. In the last two decades, extensive building and infrastructure development projects have led to an increase in the generation of construction waste material. The construction industry has a substantial impact on the environment, and its environmental effects are in direct relation to the quality and quantity of the waste it generates. This paper discusses general characteristics of the construction contractors, the contractors' willingness to pay (WTP) for improved construction waste management, determining factors which affect the amount of their willingness to pay, and suggestions and policy implications in the perspective of construction waste management in Malaysia. The data in this study is based on contractors registered with the construction industry development board (CIDB) of Malaysia. Employing the open ended contingent valuation method, the study assessed the contractors' average maximum WTP for improved construction waste management to be RM69.88 (1US$=3.6 RM) per tonne of waste. The result shows that the average maximum WTP is higher for large contractors than for medium and small contractors. The highest average maximum WTP value is RM88.00 for Group A (large contractors) RM78.25 for Group B (medium-size contractors) and RM55.80 for Group C (small contractors). One of the contributions of this study is to highlight the difference of CIDB registration grade in the WTP for improved construction waste management. It is found that contractors' WTP for improved waste collection and disposal services increases with the increase in contractors' current paid up capital. The identified factors and determinants of the WTP will assist the formulation of appropriate policies in addressing the construction waste problem in Malaysia and indirectly improve the quality of construction in the country.

  8. Information for contractors' staff

    CERN Multimedia

    The Dosimetry Service

    2005-01-01

    We have observed a significant decrease in the number of completed Certificates for Work in Controlled Radiation Areas being submitted with applications for dosimeters for your staff. Henceforth, we shall no longer be able to issue dosimeters without a certificate, which must be signed by the employee and the contractor's radiation-protection expert. You can obtain the certificate form from the Dosimetry Service at Building 24/E-011 or from our Website: http://service-rp-dosimetry.web.cern.ch/service-rp-dosimetry/. Thank you for your understanding. The Dosimetry Service

  9. 75 FR 33237 - Defense Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS...

    Science.gov (United States)

    2010-06-11

    ... Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS Case 2009-D025) AGENCY: Defense.../Pension Review from Procedures, Guidance, and Information to the Defense Acquisition Regulation Supplement..., February 23, 2006, moved requirements for Contractor Insurance/Pension Review (CIPR) from DFARS 242.7302 to...

  10. 2014 Penn State Bioinorganic Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Golbeck, John [Pennsylvania State Univ., State College, PA (United States)

    2015-10-01

    The 3rd Penn State Bioinorganic Workshop took place in early June 2014 and was combined with the 3rd Penn State Frontiers in Metallobiochemistry Symposium. The workshop was even larger than the 2nd Penn State Bioinorganic Workshop we offered in 2012. It had even more participants (162 rather than 123 in 2012). Like the 2012 workshop, the 2014 workshop had three parts. The first part consisted of 16 90-minute lectures presented by faculty experts on the topic of their expertise (see below). Based on the suggestions from the 2012 workshop, we have recorded all 16 lectures professionally and make them available to the entire bioinorganic community via online streaming. In addition, hard copies of the recordings are available as backup.

  11. INDICO Workshop

    CERN Multimedia

    CERN. Geneva; Fabbrichesi, Marco

    2004-01-01

    The INtegrated DIgital COnferencing EU project has finished building a complete software solution to facilitate the MANAGEMENT OF CONFERENCES, workshops, schools or simple meetings from their announcement to their archival. Everybody involved in the organization of events is welcome to join this workshop, in order to understand the scope of the project and to see demonstrations of the various features.

  12. Migrant and Seasonal Agricultural Worker Protection Act: Forestry contractors' model operating plan

    Science.gov (United States)

    Dan Bremer

    2007-01-01

    The Model Operating Plan for forestry contractors is a voluntary plan for compliance with the Migrant and Seasonal Agricultural Worker Protection Act (MSPA) of 1983, with amendments passed in 1996 and 1997. This plan is designed as a guide for forestry contractors who wish to comply with all federal, state, and local rules and regulations that govern their employer/...

  13. The QED Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Pieper, G.W.

    1994-07-01

    On May 18--20, 1994, Argonne National Laboratory hosted the QED Workshop. The workshop was supported by special funding from the Office of Naval Research. The purpose of the workshop was to assemble of a group of researchers to consider whether it is desirable and feasible to build a proof-checked encyclopedia of mathematics, with an associated facility for theorem proving and proof checking. Among the projects represented were Coq, Eves, HOL, ILF, Imps, MathPert, Mizar, NQTHM, NuPrl, OTTER, Proof Pad, Qu-Prolog, and RRL. Although the content of the QED project is highly technical rigorously proof-checked mathematics of all sorts the discussions at the workshop were rarely technical. No prepared talks or papers were given. Instead, the discussions focused primarily on such political, sociological, practical, and aesthetic questions, such as Why do it? Who are the customers? How can one get mathematicians interested? What sort of interfaces are desirable? The most important conclusion of the workshop was that QED is an idea worthy pursuing, a statement with which virtually all the participants agreed. In this document, the authors capture some of the discussions and outline suggestions for the start of a QED scientific community.

  14. Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    MERCADO, L.C.

    2000-01-01

    This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects

  15. Contractors' Support of U.S. Operations in Iraq

    National Research Council Canada - National Science Library

    Frisk, Daniel; Trunkey, R. D; Talaber, Adam; Adedeji, Adebayo; Liu, Victoria; Dennis, Robert; Gullo, Theresa; Sammartino, Frank; Murphy, Robert; Elsea, Jennifer

    2008-01-01

    .... This paper, which covers the period from 2003 through 2007, provides an overview of the federal costs of employing contractors in Iraq and in nearby countries, the type of products and services...

  16. How Do Contractors Select Suppliers for Greener Construction Projects? The Case of Three Swedish Companies

    Directory of Open Access Journals (Sweden)

    Shahin Mokhlesian

    2014-06-01

    Full Text Available There are many studies of contractor selection based on clients and the selection of suppliers by contractors. However, supplier selection specifically related to green construction projects has been much less studied. Green construction differs from conventional construction because of differences in its underlying principles and use of environmentally-friendly materials and technologies. This paper studies how procurers in contractor companies in Sweden adopt green projects and how contractor perception of supplier mastery of green knowledge affects supplier selection. The investigation is based on a set of semi-structured interviews conducted among three large contractors in Sweden. A main finding is that the perceived differences between green and conventional projects do not change supplier selection dramatically. An implication is that “greener projects” is a more appropriate denotation than “green project”. Evidence shows that suppliers’ green knowledge is an important factor in supplier selection, as respondents rated suppliers’ knowledge of green projects as very important, and to fix his, there was a consensus among respondents about the need for close collaboration between contractors and suppliers. To ensure knowledge acquisition from suppliers and to increase their competitive advantage over rivals, contractors collaborate with their suppliers in a partnering setting. It is anticipated that the results of this study will be used to fill the gap in the literature on supplier selection in green projects and can also be used for construction firms contemplating getting involved in green projects.

  17. 48 CFR 227.7207 - Contractor data repositories.

    Science.gov (United States)

    2010-10-01

    ... repositories. 227.7207 Section 227.7207 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Computer Software and Computer Software Documentation 227.7207 Contractor data repositories. Follow 227.7108 when it is in the Government's interests to have a data repository include computer software or to...

  18. Regulatory and technical reports (abstract index journal). Compilation for second quarter 1986, April-June, 1986. Volume 11, No. 2

    International Nuclear Information System (INIS)

    1986-07-01

    This journal includes all formal reports in the NUREG series prepared by the NRC staff and contractors, as well as proceedings of conferences and workshops. The entries in the compilation are indexed for access by title and abstract, contractor report number, personal author, subject, NRC organization, contractor, and licensed facility

  19. Regulatory and technical reports (Abstract Index Journal): Compilation for third quarter 1986, July-September

    International Nuclear Information System (INIS)

    1986-11-01

    This journal includes all formal reports in the NUREG series prepared by the NRC staff and contractors, as well as proceedings of conferences and workshops. The entries in the compilation are indexed for access by title and abstract, contractor report number, personal author, subject, NRC organization, contractor, and licensed facility

  20. Workshop in Genetics: Saraiva Family and their genes – The children are different, but they are all Saraiva!

    Directory of Open Access Journals (Sweden)

    Mariluza Zucco Rizzon

    2016-02-01

    Full Text Available This article reports the development of a workshop held at the IV Symposium on Science and Mathematics Education of Serra Gaúcha, with the implementation of the Problem-Based Learning method. In this active learning method the student is the protagonist of the teaching and learning process, and actively develops a roadmap of studies based on real-life problems. During the workshop, besides getting to know the Problem-Based Learning method, the participants simulated the reproduction of a human couple, taking into account ten genetic characteristics, beyond sex. To solve the problem situation that was proposed, participants also simulated the formation of male and female gametes, the fertilization, the genotypes and phenotypes of the generated offspring, and also carried out the construction of a model. Workshop participants solved the problem posed with commitment and dedication. All participants said they had not previously known the active learning method presented. However, they had already applied the proposed activity with their students, not as an introductory activity but as a closing activity of the learning unit or as a means of evaluation.

  1. 48 CFR 245.608-7 - Reimbursement of cost for transfer of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Reimbursement of cost for transfer of contractor inventory. 245.608-7 Section 245.608-7 Federal Acquisition Regulations System... Reporting, Redistribution, and Disposal of Contractor Inventory 245.608-7 Reimbursement of cost for transfer...

  2. Key aspects in managing safety when working with multiple contractors: A case study

    NARCIS (Netherlands)

    Drupsteen, L.; Rasmussen, H.B.; Ustailieva, E.; Kampen, J. van

    2015-01-01

    Working with multiple contractors in a shared workplace can introduce and increase safety risks due to complexity. The aim of this study was to explore how safety issues are recognized in a specific case and to identify whether clients and contractors perceive problems similarly. The safety issues

  3. Private Security Contractors in Iraq: Background, Legal Status, and Other Issues

    Science.gov (United States)

    2008-09-29

    reporting procedures, bad investigation methods and unfair double standards amongst employees should not be condoned." Tom Jackman , “Security Contractor...Cleared in Two Firings”, Washington Post, August 2, 2007. p. A-15. 43 Tom Jackman . “U.S. Contractor Fired on Iraqi Vehicles for Sport, Suit Alleges...Public Diplomacy and Public Affairs Karen Hughes , speaking before the Council on Foreign Relations, New York City, N.Y., on May 10, 2006, said of the new

  4. Design management of general contractor under nuclear power project EPC mode

    International Nuclear Information System (INIS)

    Su Shaojian

    2013-01-01

    Design management has not yet formed a theoretical system recognized, general contractor design managers under nuclear power project EPC Mode lack the clear theory basis. This paper aims to discuss Design management from the angle of general contractor under nuclear power project EPC mode, Gives the concept of design management Clearly, by Combining the characteristics of nuclear power project, Gives the specific content and meaning of the design management of nuclear power project. (authors)

  5. Defense Trade Contractors Engage in Varied International Alliances

    National Research Council Canada - National Science Library

    2000-01-01

    .... Generally, two or more companies form a team by negotiating an agreement to work together to pursue a particular government procurement, with one company acting as the primary contractor and others as subcontractors...

  6. Workshop on the use of PRA methodology for the analysis of reactor events and operational data: Proceedings

    International Nuclear Information System (INIS)

    Rasmuson, D.M.

    1992-06-01

    A workshop entitled ''The Use of PRA Methodology for the Analysis of Reactor Events and Operational Data'' was held on January 29--30, 1992 in Annapolis, Maryland. Over 50 participants from the NRC, its contractors, and others participated in the meetings. During the first day, presentations were made by invited speakers to discuss issues in relevant topics. On the second day, discussion groups were held to focus on three areas: risk significance of operational events, industry risk profile and generic concerns, and risk monitoring and risk-based performance indicators. Important considerations identified from the workshop are the following: Improve the Accident Sequence Precursor models and data. Improve the SCSS and NPRDS (e.g., by adding detailed performance information on selected components, by improving narratives on failure causes). Develop risk-based performance indicators. Use risk insights to help focus trending and performance analyses of components, systems, initiators, and sequences. Improve the statistical quality of trending and performance analyses. Flag implications of special conditions (e.g., external events, containment performance) during data studies. Trend common cause and human performance using appropriate models to obtain a better understanding of the impact and causes of failure. Develop a method for producing an industry risk profile

  7. Defense Contract Audit Agency Audits of Contractor Compliance with Cost Accounting Standards

    Science.gov (United States)

    1999-01-11

    Appendix B. Continued Need for Cost Accounting Standards Asset Valuations. GAAP requires that assets be revalued after mergers and acquisitions. If the...purchase method is used to revalue assets , depreciation and amortization costs may increase drastically to be passed on as increased costs on...contractor fully for the assets through normal depreciation . Contractor Pension Plans. Government-funded pension assets must be properly allocated

  8. Out of the Shadows: The Health and Well-Being of Private Contractors Working in Conflict Environments.

    Science.gov (United States)

    Dunigan, Molly; Farmer, Carrie M; Burns, Rachel M; Hawks, Alison; Setodji, Claude Messan

    2014-01-01

    Over the past decade, private contractors have been deployed extensively around the globe. In addition to supporting U.S. and allied forces in Iraq and Afghanistan, contractors have assisted foreign governments, nongovernmental organizations, and private businesses by providing a wide range of services, including base support and maintenance, logistical support, transportation, intelligence, communications, construction, and security. At the height of the conflicts in Iraq and Afghanistan, contractors outnumbered U.S. troops deployed to both theaters. Although these contractors are not supposed to engage in offensive combat, they may nonetheless be exposed to many of the stressors that are known to have physical and mental health implications for military personnel. RAND conducted an online survey of a sample of contractors who had deployed on contract to a theater of conflict at least once between early 2011 and early 2013. The survey collected demographic and employment information, along with details about respondents' deployment experience (including level of preparation for deployment, combat exposure, and living conditions), mental health (including probable posttraumatic stress disorder, depression, and alcohol misuse), physical health, and access to and use of health care. The goal was to describe the contractors' health and well-being and to explore differences across the sample by such factors as country of citizenship, job specialty, and length and frequency of contract deployment. The findings provide a foundation for future studies of contractor populations and serve to inform policy decisions affecting contractors, including efforts to reduce barriers to mental health treatment for this population.

  9. Alternate fusion fuels workshop

    International Nuclear Information System (INIS)

    1981-06-01

    The workshop was organized to focus on a specific confinement scheme: the tokamak. The workshop was divided into two parts: systems and physics. The topics discussed in the systems session were narrowly focused on systems and engineering considerations in the tokamak geometry. The workshop participants reviewed the status of system studies, trade-offs between d-t and d-d based reactors and engineering problems associated with the design of a high-temperature, high-field reactor utilizing advanced fuels. In the physics session issues were discussed dealing with high-beta stability, synchrotron losses and transport in alternate fuel systems. The agenda for the workshop is attached

  10. 48 CFR 3.104-4 - Disclosure, protection, and marking of contractor bid or proposal information and source...

    Science.gov (United States)

    2010-10-01

    ... otherwise authorized by law or regulation. Any release containing contractor bid or proposal information or..., and marking of contractor bid or proposal information and source selection information. 3.104-4... marking of contractor bid or proposal information and source selection information. (a) Except as...

  11. The Third ATLAS ROD Workshop

    CERN Multimedia

    Poggioli, L.

    A new-style Workshop After two successful ATLAS ROD Workshops dedicated to the ROD hardware and held at the Geneva University in 1998 and in 2000, a new style Workshop took place at LAPP in Annecy on November 14-15, 2002. This time the Workshop was fully dedicated to the ROD-TDAQ integration and software in view of the near future integration activities of the final RODs for the detector assembly and commissioning. More precisely, the aim of this workshop was to get from the sub-detectors the parameters needed for T-DAQ, as well as status and plans from ROD builders. On the other hand, what was decided and assumed had to be stated (like EB decisions and URDs), and also support plans. The Workshop gathered about 70 participants from all ATLAS sub-detectors and the T-DAQ community. The quite dense agenda allowed nevertheless for many lively discussions, and for a dinner in the old town of Annecy. The Sessions The Workshop was organized in five main sessions: Assumptions and recommendations Sub-de...

  12. The IAF's Argentine Grantees: Caught in the Crisis. Indigenous Awakening; Self-Help and the Cities; Storm Clouds and Hope on the Pampa.

    Science.gov (United States)

    Durbin, Paula

    2003-01-01

    Examines how Inter-American Foundation's grantees in Argentina are coping with the country's economic crisis of 2001. Describes community development projects in Indigenous regions, the role of urban schools as the only functioning public institution providing human services, literacy education in Patagonia, job training and support for…

  13. Technical Assistance Contractor management plan. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project

  14. Emergency response workers workshop

    International Nuclear Information System (INIS)

    Agapeev, S.A.; Glukhikh, E.N.; Tyurin, R.L.

    2012-01-01

    A training workshop entitled Current issues and potential improvements in Rosatom Corporation emergency prevention and response system was held in May-June, 2012. The workshop combined theoretical training with full-scale practical exercise that demonstrated the existing innovative capabilities for radiation reconnaissance, diving equipment and robotics, aircraft, emergency response and rescue hardware and machinery. This paper describes the activities carried out during the workshop [ru

  15. Financial Reporting by Selected Defense Agencies of Government Property in the Custody of Contractors

    National Research Council Canada - National Science Library

    1997-01-01

    ... over the $92 billion of Government property in the custody of contractors. After several years of planning, DoD has not developed a standard accounting system for recording, tracking, and reporting Government property in the custody of contractors...

  16. 48 CFR 22.1503 - Procedures for acquiring end products on the List of Products Requiring Contractor Certification...

    Science.gov (United States)

    2010-10-01

    ... end products on the List of Products Requiring Contractor Certification as to Forced or Indentured... products on the List of Products Requiring Contractor Certification as to Forced or Indentured Child Labor... contracting officer must check the List of Products Requiring Contractor Certification as to Forced or...

  17. 2015 Inverter Workshop | Photovoltaic Research | NREL

    Science.gov (United States)

    Inverter Workshop 2015 Inverter Workshop Wednesday, February 25, 2015 Chair: Jack Flicker In about inverters. This workshop represented a follow-on to the inverter workshops that Sandia National conversations between module and inverter experts. Agenda For a detailed schedule of the day's events, access

  18. First International Workshop on Grid Simulator Testing of Wind Turbine Drivetrains: Workshop Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    Gevorgian, V.; Link, H.; McDade, M.; Mander, A.; Fox, J. C.; Rigas, N.

    2013-11-01

    This report summarizes the proceedings of the First International Workshop on Grid Simulator Testing of Wind Turbine Drivetrains, held from June 13 to 14, 2013, at the National Renewable Energy Laboratory's National Wind Technology Center, located south of Boulder, Colorado. The workshop was sponsored by the U.S. Department of Energy and cohosted by the National Renewable Energy Laboratory and Clemson University under ongoing collaboration via a cooperative research and development agreement. The purpose of the workshop was to provide a forum to discuss the research, testing needs, and state-of-the-art apparatuses involved in grid compliance testing of utility-scale wind turbine generators. This includes both dynamometer testing of wind turbine drivetrains ('ground testing') and field testing grid-connected wind turbines. Four sessions followed by discussions in which all attendees of the workshop were encouraged to participate comprised the workshop.

  19. 78 FR 64143 - 30-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Science.gov (United States)

    2013-10-25

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5683-N-88] 30-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Chief Information... Title of Information Collection: Contractor's Requisition--Project Mortgages. OMB Approval Number: 2502...

  20. Tandem mirror theory workshop

    International Nuclear Information System (INIS)

    1981-05-01

    The workshop was divided into three sections which were constituted according to subject matter: RF Heating, MHD Equilibrium and Stability, and Transport and Microstability. An overview from Livermore's point of view was given at the beginning of each session. Each session was assigned a secretary to take notes. These notes have been used in preparing this report on the workshop. The report includes the activities, conclusions, and recommendations of the workshop

  1. International cooperation workshop. Regional workshop for CTBTO international cooperation: Africa

    International Nuclear Information System (INIS)

    1999-08-01

    Pursuant to the 1999 programme of work, and following the International Cooperation Workshop held in Vienna, Austria, in 1998, the Provisional Technical Secretariat (PTS) of the Preparatory Commission for the CTBTO (Prep Com) held a regional Workshop for CTBTO International Cooperation in Cairo. The purpose of the workshop was to identify how and by what means the Africa region can promote international cooperation in CTBT verification related technologies, and how the region can benefit from and contribute to Prep Com activity. PTS staff briefed the 40 participants from 22 African States who attended the Workshop on general aspects, including costs, of the establishment and operation of the CTBT verification system, including its four monitoring technologies. Participants were informed on opportunities for local institutions in the establishment of monitoring stations and on possible support for national and regional data centres. National experts presented their research and development activities and reviewed existing experiences on bi/multi-lateral cooperation. The main points of the discussion focused on the need to engage governments to advance signature/ratification, and further training opportunities for African states

  2. 75 FR 58411 - Center for Veterinary Medicine eSubmitter Workshop; Public Workshop; Request for Comments

    Science.gov (United States)

    2010-09-24

    ...] Center for Veterinary Medicine eSubmitter Workshop; Public Workshop; Request for Comments AGENCY: Food... Drug Administration (FDA) is announcing a public workshop entitled: ``Center for Veterinary Medicine... be emailed to all registrants. Contact Person: Charles Andres, Center for Veterinary Medicine (HFV...

  3. 2005 River Corridor Cleanup Contractor Revegetation Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    A. L. Johnson

    2005-09-12

    This report contains a compilation of the results of vegetation monitoring data that were collected in the spring and summer of 2005 for the Environmental Restoration Contractor's revegetation and mitigation areas on the Hanford Site.

  4. Delivery Mechanisms for Rural Electrification. A report from a workshop

    Energy Technology Data Exchange (ETDEWEB)

    Gullberg, Monica; Ilskog, Elisabeth; Arvidson, Anders; Katyega, Maneno (eds.)

    2004-04-01

    The workshop was attended by 28 participants from Kenya, Mozambique South Africa, Sweden, Tanzania, Uganda, Zambia and Zimbabwe, representing energy service providers (private, public and cooperative), consumer groups, public energy authorities, researchers, consultants, NGOs and the Swedish International Development Cooperation Agency. The topic of the workshop was how different types of electricity delivery mechanisms - i.e. the combination of an energy supply technology and the organisation managing it - can support rural development. Which energy services have high priority for rural development? What are the appropriate delivery mechanisms? How can the expansion of different delivery mechanisms be supported and made to work efficiently? These are some of the key questions that were discussed in the workshop. The objectives of the workshop were to share experiences and develop a better understanding of existing and potential energy delivery mechanisms that contribute to development in rural areas in Eastern and Southern Africa. The workshop was targeted at, amongst others, the authorities which are in the process of being formed, or have recently been formed, to take charge of rural electrification such as the Rural Electrification Agencies and Rural Electrification Funds. Four case studies were presented and discussed to provide an introduction to the topic, and concrete examples of different delivery mechanisms were given to inspire the workshop discussions. Focus group discussions were used to explore the participants perceptions and experience of: (i) what rural development is, (ii) what role energy plays in rural development, (iii) which energy services are important for rural development, (iv) which delivery mechanisms are used and appropriate for different situations of energy service delivery in rural areas, and (v) what the institutional framework requirements are for delivering different types of energy services and supporting different types of

  5. Network workshop

    DEFF Research Database (Denmark)

    Bruun, Jesper; Evans, Robert Harry

    2014-01-01

    This paper describes the background for, realisation of and author reflections on a network workshop held at ESERA2013. As a new research area in science education, networks offer a unique opportunity to visualise and find patterns and relationships in complicated social or academic network data....... These include student relations and interactions and epistemic and linguistic networks of words, concepts and actions. Network methodology has already found use in science education research. However, while networks hold the potential for new insights, they have not yet found wide use in the science education...... research community. With this workshop, participants were offered a way into network science based on authentic educational research data. The workshop was constructed as an inquiry lesson with emphasis on user autonomy. Learning activities had participants choose to work with one of two cases of networks...

  6. Workshop report: US-China workshop on smart structures and smart systems

    Science.gov (United States)

    Tomizuka, Masayoshi

    2006-03-01

    A Joint U.S.-China workshop on the topic of Integrated Sensing Systems, Mechatronics and Smart Structures Technologies was held in Jinan, China in October 2005 to evaluate the current status of research and education in the topic areas in the United States and China, to identify critical and strategic research and educational issues of mutual interest, and to identify joint research projects and potential research teams for collaborative research activities. The workshop included a series of presentations by leading researchers and educators from the United States and China and group discussions on the workshop objectives.

  7. Army Depot Maintenance: More Effective Use of Organic and Contractor Resources

    Science.gov (United States)

    1990-06-04

    terkerrny (PA) RRAD Red River (TX) IBAD Lexingtor).Bluegrass (KY) 3MPUAD Pueblo (CO) 2000 ANAD CCAD TEAD TOAD SAAO LEAD FMD LBAD PUAfl j] Aut)’onzed Onboard...until it is received by the contractor. That problem could be eliminated by redesigning the process. Specifically, the FTA document that notifies the...should revise CCSS to allow the FTM document to generate an image to LCA, the FTA to create a due-in to the contractor, and CCSS to determine the depot

  8. 75 FR 6669 - Federal Acquisition Regulation; Submission for OMB Review; Contractors' Purchasing Systems Reviews

    Science.gov (United States)

    2010-02-10

    ...' Purchasing Systems Reviews AGENCIES: Department of Defense (DOD), General Services Administration (GSA), and... collection requirement concerning contractors' purchasing systems reviews. A request for public comments was..., Washington, DC 20405. Please cite OMB Control No. 9000-0132, Contractors' Purchasing Systems Review, in all...

  9. 78 FR 45945 - 60-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Science.gov (United States)

    2013-07-30

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5687-N-34] 60-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Assistant Secretary... Section A. A. Overview of Information Collection Title of Information Collection: Contractor's Requisition...

  10. Financial Planning and Management Practices of Electrical Contractors

    Directory of Open Access Journals (Sweden)

    Lucko Gunnar

    2016-12-01

    Full Text Available Contractors must carefully manage their cash outflows (e.g., for materials to enable their work and inflows (after the work to be profitable, particularly in an economy that is still recovering from the 2008-2012 recession that grew out of the mortgage crisis. Their importance for business success is undisputed, as bankruptcies due to insufficient cash flow underline. Therefore, this study investigated current business practices of electrical contracting companies of different sizes with respect to their financial planning and management. A detailed questionnaire was developed with best guidelines on survey studies and pilot testing. It was sent to members of the National Electrical Contractors Association. Respondent anonymity was ensured. The survey recorded demographics, business practices, operating conditions, and other important factors using 57 subquestions. Each section allowed feedback to clarify the numerical responses. Responses were well distributed across company sizes, so that the results are representative for the entire industry. The results indicated that contractors generally have a substantial amount of experience in financial decision making. Their approach is conservative and focuses on healthy growth. Yet, opportunities to fine-tune business practices are identified, e.g., immediate invoicing, considering discounts to accelerate payment receipts, attempting to negotiate and use favorable credit terms, reviewing payment performance, and performing frequent cash flow forecasts. Some of the differences in the responses can be attributed to different company sizes. To help especially smaller companies in planning their cash flow, a spreadsheet for implementation has been created.

  11. Institutional and resource constraints that inhibit contractor ...

    African Journals Online (AJOL)

    Results show that contractors face institutional constraints (work allocation limitations, lack of performance incentives and high transaction costs, such as negotiation costs, the risk of a loss in work and contract default risk), cash flow problems, poor physical infrastructure and a lack of labour. It is expected that the promotion ...

  12. Private Military Contractors, War Crimes and International ...

    African Journals Online (AJOL)

    The end of the Cold War witnessed the growth and spread of legally established private military contractors (PMCs) playing largely undefined roles in wars, international security and post-conflict reconstruction. The operations of PMCs in Iraq and Afghanistan in the 21st century have been marked by gross human rights ...

  13. Defense Department Profit and Contract Finance Policies and Their Effects on Contract and Contractor Performance

    National Research Council Canada - National Science Library

    Arnold, Scot A; Harmon, Bruce R; Tyson, Karen W; Fasana, Kenton G; Wait, Christopher S

    2009-01-01

    .... The goal of profit policy is a contract price that reimburses the contractor for its costs, provides the necessary incentives to yield beneficial performance, and provides the contractor with sufficient risk reward...

  14. Proceedings of the remedial investigation/feasibility study workshop

    International Nuclear Information System (INIS)

    1988-12-01

    The objective of this workshop was to familiarize Department of Energy (DOE) personnel and contractors with all aspects of developing, managing, and conducting an RI/FS, based on HAZWRAP SCO experience in similar activities as part of the Installation Restoration program (IRP). The HAZWRAP SCO participation in Department of Defense (DOD) restoration activities provides an opportunity to develop capability and experience which are transferable to DOE activities. Paul Franco, Program Manager for the IRP, provided an overview of the IRP experience in conducting an RI/FS for a National Priorities List (NPL) site and a non-NPL site. A non-NPL site does not require an RI/FS by regulation; however, the RI/FS process can be used to determine whether to proceed with a feasibility study or terminate the action with a decision document. Al Porell, Program Manager for ICP, discussed the use of decision documents to remove non-NPL sites from regulatory consideration. DOE-Idaho has used similar documentation to remove numerous sites from their list of potential remedial action sites. Mr. Porell also discussed the use of the Technical Review Committee (TRC), which is established to coordinate activities during the RI/FS process. The TRC includes state, local, and federal authorities, and Air Force installation personnel

  15. The Astronomy Workshop

    Science.gov (United States)

    Hamilton, D. P.; Asbury, M. L.; Proctor, A.

    2001-12-01

    The Astronomy Workshop (http://janus.astro.umd.edu) is an interactive online astronomy resource developed, and maintained at the University of Maryland, for use by students, educators and the general public. The Astronomy Workshop has been extensively tested and used successfully at many different levels, including High School and Junior High School science classes, University introductory astronomy courses, and University intermediate and advanced astronomy courses. Some topics currently covered in the Astronomy Workshop are: Animated Orbits of Planets and Moons: The orbits of the nine planets and 91 known planetary satellites are shown in animated, to-scale drawings. The orbiting bodies move at their correct relative speeds about their parent, which is rendered as an attractive, to-scale gif image. Solar System Collisions: This most popular of our applications shows what happens when an asteroid or comet with user-defined size and speed impacts a given planet. The program calculates many effects, including the country impacted (if Earth is the target), energy of the explosion, crater size, magnitude of the planetquake generated. It also displays a relevant image (e.g. terrestrial crater, lunar crater, etc.). Planetary and Satellite Data Calculators: These tools allow the user to easily calculate physical data for all of the planets or satellites simultaneously, making comparison very easy. Orbital Simulations: These tools allow the student to investigate different aspects of the three-body problem of celestial mechanics. Astronomy Workshop Bulletin Board: Get innovative teaching ideas and read about in-class experiences with the Astronomy Workshop. Share your ideas with other educators by posting on the Bulletin Board. Funding for the Astronomy Workshop is provided by the National Science Foundation.

  16. Innovative confinement concepts workshop

    International Nuclear Information System (INIS)

    Kirkpatrick, R.C.

    1998-01-01

    The Innovative Confinement Concepts Workshop occurred in California during the week preceding the Second Symposium on Current Trends in International Fusion Research. An informal report was made to the Second Symposium. A summary of the Workshop concluded that some very promising ideas were presented, that innovative concept development is a central element of the restructured US DOE. Fusion Energy Sciences program, and that the Workshop should promote real scientific progress in fusion

  17. WORKER PROTECTION: Federal Contractors and Violations of Labor Law

    National Research Council Canada - National Science Library

    1995-01-01

    ... of Federal Contract Compliance Programs (OFCCP). Federal law and an executive order place greater responsibilities on federal contractors compared with other employers In some areas of workplace activity...

  18. When Contractors Deploy: A Guide for the Operational Commander

    National Research Council Canada - National Science Library

    Buhler, Carl

    2000-01-01

    .... Furthermore, this paper also lists four recommendations for operational commanders and the military on how to better integrate contractors into the military effort, especially during hostile combat situations...

  19. IPCC workshop on impacts of ocean acidification on marine biology and ecosystems. Workshop report

    Energy Technology Data Exchange (ETDEWEB)

    Field, C.B.; Barros, V.; Stocker, T.F.; Dahe, Q.; Mach, K.J.; Plattner, G.-K.; Mastrandrea, M.D.; Tignor, M.; Ebi, K.L.

    2011-09-15

    Understanding the effects of increasing atmospheric CO{sub 2} concentrations on ocean chemistry, commonly termed ocean acidification, as well as associated impacts on marine biology and ecosystems, is an important component of scientific knowledge about global change. The Fifth Assessment Report (AR5) of the Intergovernmental Panel on Climate Change (IPCC) will include comprehensive coverage of ocean acidification and its impacts, including potential feedbacks to the climate system. To support ongoing AR5 assessment efforts, Working Group II and Working Group I (WGII and WGI) of the IPCC held a joint Workshop on Impacts of Ocean Acidification on Marine Biology and Ecosystems in Okinawa, Japan, from 17 to 19 January 2011. The workshop convened experts from the scientific community, including WGII and WGI AR5 authors and review editors, to synthesise scientific understanding of changes in ocean chemistry due to increased CO{sub 2} and of impacts of this changing chemistry on marine organisms, ecosystems, and ecosystem services. This workshop report summarises the scientific content and perspectives presented and discussed during the workshop. It provides syntheses of these perspectives for the workshop's core topics: (i) the changing chemistry of the oceans, (ii) impacts of ocean acidification for individual organisms, and (iii) scaling up responses from individual organisms to ecosystems. It also presents summaries of workshop discussions of key cross-cutting themes, ranging from detection and attribution of ocean acidification and its impacts to understanding ocean acidification in the context of other stressors on marine systems. Additionally, the workshop report includes extended abstracts for keynote and poster presentations at the workshop. (Author)

  20. APPROVAL OF WASTE TREATMENT AND IMMOBILIZATION PLANT CONTRACTOR-INITIATED AUTHORIZATION BASIS AMENDMENT REQUESTS (ABAR)

    International Nuclear Information System (INIS)

    JONES GL

    2008-01-01

    The objective is to describe the process used by the Office of River Protection (ORP) for evaluating and implementing Contractor-initiated changes to the Waste Treatment and Immobilization Plant (WTP) Authorization Basis (AB). The WTP Project's history has provided a unique challenge for establishing and maintaining an ORP-approved AB during design and construction. Until operations begin, the project cannot implement the classic Unreviewed Safety Question (USQ) process to determine when ORP approval of Contractor-initiated changes is required. A 'quasiUSQ' process has been implemented that defines when AB changes could occur. The three types of AB changes are (1) Limited Scope Changes, (2) Authorization Basis Deviations, and (3) Authorization Basis Amendment Request (ABAR). DOE RL/REG 97-13, 'Office of River Protection Position on Contractor-Initiated Changes to the Authorization Basis', describes the process the WTP Contractor must follow to make changes to the AB, with and without ORP approval. The process uses a 'safety evaluation' process that is similar to the USQ process but at a more qualitative level. The maturation of the WTP Contractor's facility design and activities, and other changing conditions, resulted in a process that allows the Contractor to make changes to the AB without ORP approval; however, those changes that may significantly affect nuclear safety do require ORP approval. This process balances the WTP regulatory principle of efficiency with assurance that adequate safety will not be compromised. The process has reduced the number of ABARs requiring ORP approval and reduced the potential for delays in design and procurement activities

  1. Defense Department Profit and Contract Finance Policies and Their Effects on Contract and Contractor Performance

    National Research Council Canada - National Science Library

    Arnold, Scot A; Harmon, Bruce R; Tyson, Karen W; Fasana, Kenton G; Wait, Christopher S

    2008-01-01

    .... The goal of profit policy is a contract price that reimburses the contractor for its costs, provides the necessary incentives to yield beneficial performance, and to provide the contractor with sufficient risk reward...

  2. Workshop on Subcritical Neutron Production

    International Nuclear Information System (INIS)

    Walter Sadowski; Roald Sagdeev

    2006-01-01

    Executive Summary of the Workshop on Subcritical Neutron Production A workshop on Subcritical Neutron Production was sponsored by the East-West Center of the University of Maryland on October 11-13, 2004. The subject of the workshop was the application of subcritical neutrons to transmutation of actinides. The workshop was attended by members of the fission, accelerator and fusion communities. Papers on the state of development of neutron production by accelerators, fusion devices, and fission reactors were presented. Discussions were held on the potential of these technologies to solve the problems of spent nuclear waste storage and nuclear non-proliferation presented by current and future nuclear power reactors. A list of participants including their affiliation and their E-Mail addresses is attached. The workshop concluded that the technologies, presently available or under development, hold out the exciting possibility of improving the environmental quality and long term energy resources of nuclear power while strengthening proliferation resistance. The workshop participants agreed on the following statements. The workshop considered a number of technologies to deal with spent nuclear fuels and current actinide inventories. The conclusion was reached that substantial increase in nuclear power production will require that the issue of spent nuclear fuel be resolved. The Workshop concluded that 14 MeV fusion neutrons can be used to destroy nuclear reactor by-products, some of which would otherwise have to be stored for geologic periods of time. The production of 14 MeV neutrons is based on existing fusion technologies at different research institutions in several countries around the world. At the present time this technology is used to produce 14 MeV neutrons in JET. More development work will be required, however, to bring fusion technology to the level where it can be used for actinide burning on an industrial scale. The workshop concluded that the potential

  3. BUSINESS STRATEGY OF LARGE CONTRACTORS IN ADOPTING INDUSTRIALISED BUILDING SYSTEM (IBS: THE MALAYSIAN CASE

    Directory of Open Access Journals (Sweden)

    FRANKY AMBON

    2012-12-01

    Full Text Available Industrialised Building System (IBS is the term coined by the government and industry in Malaysia to represent the construction industry and the application of prefabrication method in building construction. The purpose of this exploratory research paper is to highlight business strategy being pursued by large Malaysian contractors in adopting IBS. The paper uses case study as research method. The analysis is based primarily on cross-case analysis and pattern matching technique. The paper observes contractors which involved in IBS are part of larger holding companies in a corporate set-up include design and manufacturing subsidiaries. The companies positioned themselves as one-stop total solution provider for IBS and offer a wider range of services from design, production, and installation to clients. To become competitive and able to create total solution, contractors need to establish cluster and consortium of integrated project team by creating a partnership when and where it is needed. A vendor development programme modelled along the lines of the development of automotive industry should also be established. Future empirical studies should extensively examine these areas, especially the development of business model for contractors. The availability of this model could help to accelerate the uptake of IBS among contractors.

  4. IPHE Infrastructure Workshop Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-02-01

    This proceedings contains information from the IPHE Infrastructure Workshop, a two-day interactive workshop held on February 25-26, 2010, to explore the market implementation needs for hydrogen fueling station development.

  5. Proceedings of the workshop on better nuclear plant maintenance: improving human and organisational performance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-04-05

    A significant proportion of nuclear plant events is attributable to failures that take place during maintenance and periodic testing. Human and organisational factors are frequently identified as making a major contribution to these events. Despite this recognition, licensee and regulatory oversight in the human and organisational area has tended to focus more on operational matters than maintenance. Owing to the importance of human and organisational performance on nuclear plant maintenance, the CSNI Special Experts' Group on Human and Organisational Factors (SEGHOF) hosted a workshop entitled 'Better nuclear plant maintenance: improving human and organisational performance'. The workshop provided an international forum for staff from nuclear plants, research bodies, and regulators to discuss human and organisational challenges to maintenance, and initiatives to support effective performance. Over 60 participants from about 20 countries participated. The workshop was divided into five sessions: 1) International guidance to improve maintenance performance; 2) Lessons learned through maintenance operating experience; 3) Licensee initiatives to support reliable maintenance; 4) Regulatory approaches to assuring effective licensee maintenance; and 5) Recent trends and their impact on maintenance. Sessions commenced with oral presentations of papers followed by break-out and plenary discussions. Session 4 on regulatory approaches included short presentations from ten regulatory bodies and was followed by discussion comparing these approaches. The main findings of the workshop concern: the retirements of experienced staff; the increasing use of contractors to perform maintenance activities; the use of skill-broadening in maintenance; the role of supervisors at the plant level; the organisational changes that are used to optimise the use of plant staff resources; the effective planning of maintenance tasks; the time allowed to complete maintenance tasks; the development

  6. Report: Management Alert - EPA Has Not Initiated Required Background Investigations for Information Systems Contractor Personnel

    Science.gov (United States)

    Report #17-P-0409, September 27, 2017. Not vetting contractor personnel before granting them network access exposes the EPA to risks. Contractor personnel with potentially questionable backgrounds who access sensitive agency data could cause harm.

  7. Applications of ion beam analysis workshop. Workshop handbook

    International Nuclear Information System (INIS)

    1995-01-01

    A workshop on applications of ion beam analysis was held at ANSTO, immediate prior to the IBMM-95 Conference in Canberra. It aims was to review developments and current status on use of ion beams for analysis, emphasizing the following aspects: fundamental ion beam research and secondary effects of ion beams; material sciences, geological, life sciences, environmental and industrial applications; computing codes for use in accelerator research; high energy heavy ion scattering and recoil; recent technological development using ion beams. The handbook contains the workshop's program, 29 abstracts and a list of participants

  8. 2006 Fundamental Research Underlying Solid-State Lighting: Contractors Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Fitzsimmons, Tim [Dept. of Energy (DOE), Washington, DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering; Kini, Arvind [Dept. of Energy (DOE), Washington, DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering; Kelley, Dick [Dept. of Energy (DOE), Washington, DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering

    2006-02-01

    This volume highlights the scientific content of the 2006 Fundamental Research Underlying Solid-State Lighting Contractors Meeting sponsored by the Division of Materials Sciences and Engineering (DMS&E) in the Office of Basic Energy Sciences (BES) of the U. S. Department of Energy (DOE). This meeting is the second in a series of research theme-based Contractors Meetings and will focus on BES/DMS&E-funded research that underpins solid-state lighting technology. The meeting will feature research that cuts across several DMS&E core research program areas. The major programmatic emphasis is on developing a fundamental scientific base, in terms of new concepts and new materials that could be used or mimicked in designing novel materials, processes or devices.

  9. DOE contractor radiation safety CBT [computer based training] course

    International Nuclear Information System (INIS)

    Gardner, P.R.

    1986-01-01

    Westinghouse Hanford Company developed a generic Radiation Worker safety CBT course for Department of Energy contractors. Task analysis concentrated on actual and potential tasks and included visits to fourteen different contractor sites. Team Design and Prototype verification formed the major portion of the development phase. Lesson entry was accomplished using the WISE author system from WICAT Systems, Inc. The course features graded task simulations for both Pretest and Final; fourteen Topics in five Lessons, each Topic keyed to ''Critical Acts'' and Questions in the Pretest and Final; Automatic, Intensive, and Manual modes of instruction available for each Lesson; Practical Problems and Sample Questions associated with each Topic; and provisions for local configuration in several areas. The course is deliverable on IBM PC compatible equipment. 2 refs

  10. Proceedings of the workshop of three large tokamak cooperation on energy confinement scaling under intensive auxiliary heating, May 18 ∼ 20, 1992, Naka

    International Nuclear Information System (INIS)

    1992-09-01

    The workshop of three large tokamak cooperation W22 on 'Energy confinement scaling under intensive auxiliary heating' was held 18-20 May, 1992, at Naka Fusion Research Establishment. This proceedings compiles 14 synopses of contributions (5 from JET, 4 from JT-60, 3 from TFTR, and 1 each from DIII-D JFT-2M) and the summary of the workshop. Topic sections are ; (i) L-mode confinement and scaling, (ii) Confinement at high β P regimes, Supershots, High poloidal beta enhanced confinement mode etc., (iii) Confinement at various H-mode regimes and scaling (including the VH-mode), (iv) Characteristic time scales for present tokamak regimes, and (v) Theoretical comparison with experimental data. (author)

  11. Contractor selection: a quantitative, consensus-friendly, transparent ...

    African Journals Online (AJOL)

    This article offers a method for selecting contractors in an objective, transparent and participative way. The use of the Decision Analysis System (DAS), also referred to as decision-making by objectives, makes it possible that a large number of objectives can be taken into account to select the best amongst a wide range of ...

  12. Control of subcontractors by civil works contractor for a nuclear power plant

    International Nuclear Information System (INIS)

    Jiang Xinguo

    1995-10-01

    The civil works (CW) contractor is responsible for managing its subcontractors according to the requirements of quality assurance programme including the establishment of organization, quality assurance management, document control, material control, construction schedule control, inspection and test control, non-conformance control, corrective actions and executive technical files. The responsibilities of the plant owner, the CW contractor and its subcontractors in relation to performing their functions in the above-mentioned activities are described in detail

  13. Control of subcontractors by civil works contractor for a nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Xinguo, Jiang [Huaxing Construction Company, Yizheng, JS (China)

    1995-10-01

    The civil works (CW) contractor is responsible for managing its subcontractors according to the requirements of quality assurance programme including the establishment of organization, quality assurance management, document control, material control, construction schedule control, inspection and test control, non-conformance control, corrective actions and executive technical files. The responsibilities of the plant owner, the CW contractor and its subcontractors in relation to performing their functions in the above-mentioned activities are described in detail.

  14. Security of payment regime in construction industry: are Malaysian sub-contractors ready?

    OpenAIRE

    Supardi, Azizan; Adnan, Hamimah; Mohammad, Mohammad Fadhil

    2011-01-01

    In Malaysia, the particularly small sized sub-contractors are definitely benefited from payment provisions in the proposed Construction Industry Payment and Adjudication Act (CIPA Act), but need to enhance their knowledge in order to improve their awareness of the benefits of the Act. Accordingly, this on-going research attempts to introduce proper guidelines to the sub-contractors, in giving the knowledge, to claim for payment. Firstly, the research explored the problems and legal issues rel...

  15. Summer 1994 Computational Science Workshop. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    This report documents the work performed by the University of New Mexico Principal Investigators and Research Assistants while hosting the highly successful Summer 1994 Computational Sciences Workshop in Albuquerque on August 6--11, 1994. Included in this report is a final budget for the workshop, along with a summary of the participants` evaluation of the workshop. The workshop proceeding have been delivered under separate cover. In order to assist in the organization of future workshops, we have also included in this report detailed documentation of the pre- and post-workshop activities associated with this contract. Specifically, we have included a section that documents the advertising performed, along with the manner in which applications were handled. A complete list of the workshop participants in this section. Sample letters that were generated while dealing with various commercial entities and departments at the University are also included in a section dealing with workshop logistics. Finally, we have included a section in this report that deals with suggestions for future workshops.

  16. Technical Assistance Contractor management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  17. Vulcano Workshop 2016

    CERN Document Server

    Mannocchi, G.; Morselli, A.; Trinchero, G.

    2016-01-01

    We announce the XVI Vulcano Workshop, which will be held from May 22nd to May 28th, 2016 in the Vulcano Island (Sicily, Italy). As in the past editions, the workshop will aim to gather people from High Energy Astrophysics and Particle Physics to discuss the most recent highlights in these fields. The workshop will cover the following topics: Astrophysics/Cosmology, Astrophysics/Gravity, Dark Matter, Particle Physics, Cosmic Rays, Gamma/Neutrino Astronomy, Neutrinos and Future Prospects. The scientific program will include several 30-minute review talks, to introduce the current problems, and 20-minute talks, giving new experimental and theoretical results. The participation is by invitation and limited to 80 people.

  18. CEBAF/SURA 1985 Summer Workshop

    International Nuclear Information System (INIS)

    Crannel, H.

    1985-12-01

    The 1985 Summer Workshop began a new phase of planning for the experimental program at CEBAF. One goal of the Workshop was to define and describe options for equipping the CEBAF and stations with experimental equipment. Starting with an initial list of options which grew out of discussions during the Winter of 1984 and the Spring of 1985, the five working groups met during the Workshop and developed their final reports, included in these proceedings. The program of the Workshop consisted of invited talks on both theoretical and experimental topics, and working group meetings. The five working groups, include: Magnetic Spectrometers; Large Acceptance Detectors and Low Intensity Beams; Internal Targets; Positrons; Theory. These proceedings begin with an overview of CEBAF, and a report on progress made by the Magnetic Spectrometer and Internal Target Working Groups prior to the Workshop. The next part contains the invited talks, presented in the order which they were given during the week. The final reports of the five working groups follow this, and the proceedings conclude with papers contributed to the Workshop

  19. N Reactor Lessons Learned workshop

    International Nuclear Information System (INIS)

    Heaberlin, S.W.

    1993-07-01

    This report describes a workshop designed to introduce participants to a process, or model, for adapting LWR Safety Standards and Analysis Methods for use on rector designs significantly different than LWR. The focus of the workshop is on the ''Lessons Learned'' from the multi-year experience in the operation of N Reactor and the efforts to adapt the safety standards developed for commercial light water reactors to a graphite moderated, water cooled, channel type reactor. It must be recognized that the objective of the workshop is to introduce the participants to the operation of a non-LWR in a LWR regulatory world. The total scope of this topic would take weeks to provide a through overview. The objective of this workshop is to provide an introduction and hopefully establish a means to develop a longer term dialogue for technical exchange. This report provides outline of the workshop, a proposed schedule of the workshop, and a description of the tasks will be required to achieve successful completion of the project

  20. Evaluation Criteria to Deliverables Crosswalk for the Tank Farm Contractor (Supercedes HNF-2020)

    International Nuclear Information System (INIS)

    WOJTASEK, R.D.

    2000-01-01

    Before the Office of River Protection can authorize proceeding with Phase 1B, the Tank Farm Contractor (TFC) must demonstrate readiness to retrieve and deliver the waste to the privatization contractor and to receive and dispose of the products and by-products returned from treatment. The TFC has organized their plans for providing these support services into the within the River Protection Project