  1. 48 CFR 53.301-1437 - Settlement Proposal for Cost-Reimbursement Type Contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Settlement Proposal for Cost-Reimbursement Type Contracts. 53.301-1437 Section 53.301-1437 Federal Acquisition Regulations...-1437 Settlement Proposal for Cost-Reimbursement Type Contracts. ER09DE97.012 [62 FR 64951, Dec. 9, 1997] ...

  2. 48 CFR 49.206-1 - Submission of settlement proposals.

    Science.gov (United States)

    2010-10-01

    ... accounting data. Actual, standard (appropriately adjusted), or average costs may be used in preparing settlement proposals if they are determined under generally recognized accounting principles consistently... not be required to maintain unduly elaborate cost accounting systems merely because their contracts...

  3. 48 CFR 53.301-1438 - Settlement Proposal (Short Form).

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Settlement Proposal (Short Form). 53.301-1438 Section 53.301-1438 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Illustrations of Forms 53.301-1438 Settlement Proposal (Short...

  4. 7 CFR 27.94 - Spot markets for contract settlement purposes.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Spot markets for contract settlement purposes. 27.94... CONTAINER REGULATIONS COTTON CLASSIFICATION UNDER COTTON FUTURES LEGISLATION Regulations Spot Markets § 27.94 Spot markets for contract settlement purposes. The following are designated as spot markets for...

  5. Settlement

    Directory of Open Access Journals (Sweden)

    John Frow

    2011-04-01

    Full Text Available The paper explores the idea of settlement in each of its three major senses: as a place of human habitation; as a fixed and stable order of habitation; and as a political consensus reconciling fractious groups. Arguing that traditional accounts of settlement depend, with a kind of pastoral nostalgia, upon a view of abstraction and social complexity as in themselves  harmful, it follows through the implications of the concept for ways of dealing with the stranger, and it uses a drawing by the nineteenth-century indigenous Australian artist Tommy McRae, done about 1890 and entitled Corroboree, or William Buckley and dancers from the Wathaurong people, to propose a counterfactual model through which a settlement with the stranger might be imagined.

  6. Bitcoin as an Efficient Method for the International Contract Settlement

    Directory of Open Access Journals (Sweden)

    Diachek Olga Yu.

    2017-04-01

    Full Text Available The article is aimed to study the functioning of Bitcoin in today’s world. The issue of the nature of Bitcoin and tendencies in its development have been considered. Given the growing spread of Bitcoin, the number of transactions and the size of the blocks in the system will but increase. In order to maintain correct work, according to progressive growth, consideration is given to the dynamics of the increasing role of the virtual currency, the payment channels through digital coins, and the importance of assimilating such platforms. An analysis of the methods for international contract settlements was carried out. The relevance of implementation of cryptocurrency has been substantiated. The features of functioning of Bitcoin compared to the world currencies were considered. The economic properties of the block chain were studied. In turn, cryptocurrency suggests that the true value of technology lies in its growing potential. In order to develop a complete picture of the effect and scope of Bitcoin, stages of its development and the current status both in Ukraine and the world as a whole were examined. Accordingly, recommendations have been made to improve the status of Bitcoin in Ukraine

  7. The Proposed Tobacco Settlement: Issues from a Federal Perspective.

    Science.gov (United States)

    1998-04-01

    of other people at CBO provided helpful comments and suggestions as part of the agency’s internal review process. In addition, Robert Cook- Deegan ...10. Federal Trade Commission, Competition and the Financial Impact of the Proposed Tobacco Industry Settlement (September 1997). 11. Craig Howell

  8. 48 CFR 49.603-4 - Cost-reimbursement contracts-complete termination, with settlement limited to fee.

    Science.gov (United States)

    2010-10-01

    ... settlement limited to fee. [Insert the following in Block 14 of SF 30 for settlement of cost-reimbursement... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-reimbursement contracts-complete termination, with settlement limited to fee. 49.603-4 Section 49.603-4 Federal...

  9. 75 FR 48967 - Proposed Administrative Settlement Agreement Under Section 122(h) of the Comprehensive...

    Science.gov (United States)

    2010-08-12

    ... settlement agreement (``Settlement Agreement'') with Peter S. Austin, the William E. Austin Trust, and Austin & Austin Company, a partnership (``Respondents'') pursuant to Section 122(h) of the Comprehensive... CERCLA, 42 U.S.C. 9622(i), this notice is being published to inform the public of the proposed Settlement...

  10. 48 CFR 49.603-3 - Cost-reimbursement contracts-complete termination, if settlement includes cost.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-reimbursement... Termination Forms and Formats 49.603-3 Cost-reimbursement contracts—complete termination, if settlement includes cost. [Insert the following in Block 14 of SF 30 for settlement of cost-reimbursement contracts...

  11. The Proposed Tobacco Settlement: Issues from a Federal Perspective

    National Research Council Canada - National Science Library

    Antos, Joseph

    1998-01-01

    ..., sold, and consumed in the United States. That settlement would impose large payments on the tobacco industry, strengthen regulatory controls, and expand public health initiatives to reduce cigarette smoking...

  12. Issue update: a regional settlement proposal to resolve the Washington Nuclear Plant No. 3 lawsuit

    International Nuclear Information System (INIS)

    1985-08-01

    The Bonneville Power Administration (BPA) announced on August 2, 1985, that a number of substantive changes suggested by public comment on the Washington Nuclear Plant No. 3 settlement had been agreed to in principle by BPA and four private utilities. Since that date the details of these changes have been resolved, and the proposed settlement is now being offered for public review and comment

  13. 78 FR 24227 - Notice of Proposed Information Collection; Comment Request: Real Estate Settlement Procedures Act...

    Science.gov (United States)

    2013-04-24

    ... Information Collection; Comment Request: Real Estate Settlement Procedures Act (RESPA) Disclosures AGENCY.... Description of the need for the information and proposed use: The Real Estate Settlement Procedures Act of... Act), rulemaking authority for and certain enforcement authorities with respect to the Real Estate...

  14. 48 CFR 49.109-5 - Partial settlements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Partial settlements. 49... MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.109-5 Partial settlements. The TCO should attempt... settlements covering particular items of the prime contractor's settlement proposal. However, when a TCO...

  15. Manipulation of Cash-Settled Futures Contracts.

    OpenAIRE

    Pirrong, Craig

    2001-01-01

    Replacement of delivery settlement of futures contracts with cash settlement is frequently proposed to reduce the frequency of market manipulation. This article shows that it is always possible to design a delivery-settled futures contract that is less susceptible to cornering by a large long than any given cash-settled contract. Such a contract is more susceptible to manipulation by large shorts, however. Therefore, cash settlement does not uniformly dominate delivery settlement as a means o...

  16. Defense Contract Audit Agency Reviews of Price Proposals

    National Research Council Canada - National Science Library

    1998-01-01

    .... Auditors perform field pricing reviews of contractor price proposals when procurement office information is insufficient to perform the cost or price analysis needed to negotiate contract prices...

  17. 76 FR 54223 - Notice of Proposed Administrative Cost Recovery Settlement Pursuant to the Comprehensive...

    Science.gov (United States)

    2011-08-31

    ... Costs Incurred at Marine Corps Logistics Base Barstow, CA AGENCY: Department of the Navy, DoD. ACTION... of response costs incurred by the DON at the Site. The proposed Administrative Settlement resolves... DEPARTMENT OF DEFENSE Department of the Navy Notice of Proposed Administrative Cost Recovery...

  18. 78 FR 43200 - Proposed Settlement Agreement, Clean Air Act Citizen Suit

    Science.gov (United States)

    2013-07-19

    ... Social Responsibility--Los Angeles v. EPA, No. 12-56175, upon receipt of written notice from EPA that the... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OGC-2013-0484; FRL-9835-6] Proposed Settlement Agreement, Clean Air Act Citizen Suit AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of proposed...

  19. 76 FR 77528 - Proposed CERCLA Administrative Cost Recovery Settlement; North Hollywood Operable Unit of the San...

    Science.gov (United States)

    2011-12-13

    ...In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. 9622(i), notice is hereby given of a proposed administrative settlement for recovery of response costs concerning the North Hollywood Operable Unit of the San Fernando Valley Area 1 Superfund Site, located in the vicinity of Los Angeles, California, with the following settling parties: Pick-Your-Part Auto Wrecking; Hayward Associates, LLC; and PNM Properties, LLC. The settlement requires the settling parties to pay a total of $102,161 to the North Hollywood Operable Unit Special Account within the Hazardous Substance Superfund. The settlement also includes a covenant not to sue the settling parties pursuant to Section 107(a) of CERCLA, 42 U.S.C. 9607(a). For thirty (30) days following the date of publication of this notice, the Agency will receive written comments relating to the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. The Agency's response to any comments received will be available for public inspection at the City of Los Angeles Central Library, Science and Technology Department, 630 West 5th Street, Los Angeles, CA 90071 and at the EPA Region 9 Superfund Records Center, Mail Stop SFD-7C, 95 Hawthorne Street, Room 403, San Francisco, CA 94105.

  20. 76 FR 79678 - Proposed CERCLA Administrative Cost Recovery Settlement; North Hollywood Operable Unit of the San...

    Science.gov (United States)

    2011-12-22

    ...In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. 9622(i), notice is hereby given of a proposed administrative settlement for recovery of response costs concerning the North Hollywood Operable Unit of the San Fernando Valley Area 1 Superfund Site, located in the vicinity of Los Angeles, California, with the following settling parties: Pick-Your-Part Auto Wrecking; Hayward Associates, LLC; and PNM Properties, LLC. The settlement requires the settling parties to pay a total of $102,161 to the North Hollywood Operable Unit Special Account within the Hazardous Substance Superfund. The settlement also includes a covenant not to sue the settling parties pursuant to Section 107(a) of CERCLA, 42 U.S.C. 9607(a). For thirty (30) days following the date of publication of this notice, the Agency will receive written comments relating to the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. The Agency's response to any comments received will be available for public inspection at the City of Los Angeles Central Library, Science and Technology Department, 630 West 5th Street, Los Angeles, CA 90071 and at the EPA Region 9 Superfund Records Center, Mail Stop SFD-7C, 95 Hawthorne Street, Room 403, San Francisco, CA 94105.

  1. 77 FR 123 - Proposed CERCLA Administrative Cost Recovery Settlement; North Hollywood Operable Unit of the San...

    Science.gov (United States)

    2012-01-03

    ...In accordance with Section 122(i) of the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (``CERCLA''), 42 U.S.C. 9622(i), notice is hereby given of a proposed administrative settlement for recovery of response costs concerning the North Hollywood Operable Unit of the San Fernando Valley Area 1 Superfund Site, located in the vicinity of Los Angeles, California, with the following settling party: Waste Management Recycling & Disposal Services of California, Inc., dba Bradley Landfill & Recycling Center. The settlement requires the settling party to pay a total of $185,734 to the North Hollywood Operable Unit Special Account within the Hazardous Substance Superfund. The settlement also includes a covenant not to sue the settling party pursuant to Section 107(a) of CERCLA, 42 U.S.C. 9607(a). For thirty (30) days following the date of publication of this notice, the Agency will receive written comments relating to the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the settlement if comments received disclose facts or considerations which indicate that the settlement is inappropriate, improper, or inadequate. The Agency's response to any comments received will be available for public inspection at the City of Los Angeles Central Library, Science and Technology Department, 630 West 5th Street, Los Angeles CA 90071 and at the EPA Region 9 Superfund Records Center, Mail Stop SFD-7C, 95 Hawthorne Street, Room 403, San Francisco, CA 94105.

  2. 48 CFR 49.107 - Audit of prime contract settlement proposals and subcontract settlements.

    Science.gov (United States)

    2010-10-01

    ... contractor and of each subcontractor (see 49.108) includes performance of accounting reviews and any... accounting review procedures and performance, and to make appropriate comments and recommendations to the TCO... shall develop requested information and may make any further accounting reviews it considers appropriate...

  3. 75 FR 4071 - Notice of Proposed Administrative Settlement Pursuant to the Comprehensive Environmental Response...

    Science.gov (United States)

    2010-01-26

    ... (``CERCLA''), notice is hereby given that a proposed administrative cost recovery settlement concerning the T.H. Agriculture and Nutrition LLC former Superfund Site (THAN Site) in Fresno, California was... 107 of CERCLA against the following Respondents: T.H. Agriculture & Nutrition, LLC, Syngenta Crop...

  4. 78 FR 18979 - Proposed Settlement Agreement, Clean Air Act Citizen Suit

    Science.gov (United States)

    2013-03-28

    .... Jackson, Case No. 12- 1096 (D.D.C.) (``LEAN v. Jackson''). Plaintiffs filed this suit to compel the... INFORMATION CONTACT: Melina Williams, Air and Radiation Law Office (2344A), Office of General Counsel, U.S... Amended Complaint with prejudice in LEAN v. Jackson. In addition, the proposed settlement agreement...

  5. 77 FR 8253 - Notice of Proposed Settlement Agreement and Opportunity for Public Comment: Hidden Lane Landfill...

    Science.gov (United States)

    2012-02-14

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9631-3] Notice of Proposed Settlement Agreement and Opportunity for Public Comment: Hidden Lane Landfill Superfund Site ACTION: Notice. SUMMARY: In accordance... (``DOJ'') on behalf of EPA, in connection with the Hidden Lane Landfill Superfund Site, Sterling, Loudoun...

  6. The Settlement of Litigations Arising from the Interpretation and Enforcement of Administrative Contracts

    Directory of Open Access Journals (Sweden)

    Vasilica NEGRUŢ

    2015-03-01

    Full Text Available Regarded nowadays as an instrument of strategy implementation of government policy and establishment mechanism of public administration, the administrative contract raises many debates on its applicable regime, but also on the jurisdiction, to solve litigations arising from their interpretation and execution. In this paper we proposed, based on the analysis of the laws in force, doctrine, jurisprudence, and previous research results related to the subject, using the comparative method, to clarify the mentioned issues. The conclusions of this paper will strengthen the practice on the referral of courts competent to solve litigations arising from the implementation of the administrative contracts in the context where the administrative contract has profound implications in the administrative, economic and social field.

  7. Company-Community Logging Contracts in Amazonian Settlements: Impacts on Livelihoods and NTFP Harvests

    Directory of Open Access Journals (Sweden)

    Mary C. S. Menton

    2009-06-01

    Full Text Available As a result of government-sponsored colonization, more than 500 000 km2 of the Brazilian Amazon is managed by settlement households. By law, 80% of this land must remain as standing forest. In this study, we examine the potential for timber harvesting through company-community partnerships (CCPs as a means to increase forest-based revenue without compromising household use of non-timber forest products (NTFPs. Using participatory rural appraisal, resource diaries, and household questionnaires, we study the impacts of CCP logging contracts on livelihoods, including household income and NTFP harvests. Our results show that annual household income from the CCP logging is equivalent to more than 8 years of household gross income from agricultural production. We also found that there were no significant differences in NTFP harvests between households with CCP logging and those without. In CCP-logging communities, households caught 11.9 ± 13.6 game animals, totaling 74 ± 88 kg of game meat. In the communities without CCP, households caught 9.5 ± 13.0 game animals, totaling 73 ± 172 kg of game meat. Annual forest fruit harvests averaged 9.8 ± 13.2 kg in CCP-logging communities and 13.5 ± 15.9 kg in non-CCP communities. Overall, the CCPs brought improvements in household income without compromising NTFP harvests.

  8. Settlement behavior of the container for high-level nuclear waste disposal. Centrifuge model tests and proposal for simple evaluation method for settlement behavior

    International Nuclear Information System (INIS)

    Nakamura, Kunihiko; Tanaka, Yukihisa

    2004-01-01

    In Japan, bentonite will be used as buffer materials in high-level nuclear waste disposal. In the softened buffer material with the infiltration of various properties of under ground water, if the container deeply sinks, the decrease of the thickness of the buffer materials may lose the required abilities. Therefore, it is very important to consider settlement of container. In this study, influences of distilled water and artificial seawater on the settlement of the container were investigated and a simple evaluation method for settlement of the container was proposed. The following findings were obtained from this study. (1) Under the distilled water, amount of settlement decreases exponentially as dry density becomes larger. (2) While the amount of settlement of container under the 10% artificial seawater was almost equal to the one in the distilled water, the container was floating under the 100% artificial seawater. (3) The simple evaluation method for settlement of container was proposed based on the diffuse double layer theory, and the effectiveness of the proposed method was demonstrated by the results of several experiments. (author)

  9. 76 FR 77997 - Proposed CERCLA Administrative Cashout Settlement; The Atlantic Richfield Company

    Science.gov (United States)

    2011-12-15

    ... administrative settlement for recovery of past response costs concerning the Ophir Mills and Smelter Site in Tooele County, Utah with the Atlantic Richfield Company based upon a cash-out settlement. The settlement...

  10. 76 FR 69733 - Proposed CERCLA Administrative Cost Recovery Settlement; Tracy Lead Battery Site, Tracy, MN

    Science.gov (United States)

    2011-11-09

    ... Corporation, Bay Side Holding Corporation and Zenith Investment and Management Corporation. The settlement requires the settling parties to pay $45,300.00 to the Hazardous Substance Superfund. The settlement...

  11. 77 FR 69620 - Casmalia Disposal Site; Notice of Proposed CERCLA Administrative De Minimis Settlement

    Science.gov (United States)

    2012-11-20

    ... settlements. This settlement is intended to resolve the liabilities of 290 settling parties for the Casmalia... settlement requires these parties to pay over $2 million to EPA. Settling Parties: Parties that have elected...., Entenmann's/Orowheat, Eva Fkiaras, Evans Tank Lines, Exel Corp./Exel Microelectronics, Inc., Fabri Cote...

  12. The utility of the rescission clause in the settlement of disputes arising from international trade contracts

    Directory of Open Access Journals (Sweden)

    Oana BĂRBULESCU

    2015-12-01

    Full Text Available Starting from the opportunities that the creditor of an obligation has in order to settle his claims by means of the commercial arbitration, as an alternative to court under common law, with a view to punishing in the most effective way the failure of the obligation by the borrower reveals the necessity to introduce the rescission clause in international commercial contracts governed by a foreign law. This paper aims to emphasize the practical utility of the institution of rescission clause in the light of the new Civil Code regulations, in whose presence the role of the court is entirely removed in as far as the decision statement is concerned.

  13. Claims settlement in insurance contracts from a consumer protection perspective in Cameroon

    Directory of Open Access Journals (Sweden)

    Comfort Fuah Kwanga

    2017-10-01

    Full Text Available Everyone in the society is faced with the possibility of one or more hazards that are part of life will sooner or later befall him and may occasion some loss. This misfortune is uncertain as to the time and period when it will occur and this amongst others include: fire outbreak, accident, and even death. This necessitates the need for people to go for insurance policies which suit their various needs in order to permit compensation in case of loss. Most consumers of insurance products are “short changed” in the process because very few take the trouble to read through their insurance policies in order to ascertain and understand the terms and conditions. The result is that most often when a claim arises and it is discovered that the loss is not covered by the terms of the insurance contract, there is the tendency of blaming the insurance companies. This paper posits that: there are of course some “bad eggs” in the industry who manipulate consumers. However, the paper holds that this unpleasant quagmire is often due to lack of understanding of the terms of insurance contracts in general and consumer apathy in particular. The essence of this study is to re-iterate the need to communicate the rules of the insurance game, thereby minimizing some of the misunderstanding and problems faced by consumers.

  14. 77 FR 71633 - Notice of Proposed Settlement Agreement Under the National Marine Sanctuaries Act

    Science.gov (United States)

    2012-12-03

    ... of Commerce, National Oceanic and Atmospheric Administration, has reached a Settlement Agreement with..., U.S. DOJ--ENRD, P.O. Box 7611, Washington, DC 20044- 7611. Please enclose a check or money order for...

  15. 42 CFR 67.103 - Peer review of contract proposals.

    Science.gov (United States)

    2010-10-01

    ... specific health care issues; and (5) Appropriate representation based on gender, racial/ethnic origin, and... the contract(s) awarded as a result of the peer review. (e) Conflict of interest. (1) Members of peer review groups will be screened for potential conflicts of interest prior to appointment and will be...

  16. 77 FR 65380 - Notice of Proposed Administrative Settlement Pursuant to the Comprehensive Environmental Response...

    Science.gov (United States)

    2012-10-26

    ... Gulf State Utilities--North Ryan Street Superfund Site, Lake Charles, Calcasieu Parish, Louisiana. The... will receive written comments relating to this notice and will receive written comments relating to the settlement. The Agency will consider all comments received and may modify or withdraw its consent to the...

  17. 78 FR 74128 - Proposed CERCLA Administrative Cost Recovery Settlement; Cadie Auto Salvage Site, Belvidere...

    Science.gov (United States)

    2013-12-10

    ... Recovery Settlement; Cadie Auto Salvage Site, Belvidere, Boone County, Illinois AGENCY: Environmental... Auto Salvage Site in Belvidere, Boone County, Illinois with the following settling parties: UOP, LLC... Cadie Auto Salvage Site, Belvidere, Boone County, Illinois and EPA Docket No. and should be addressed to...

  18. 78 FR 77673 - Proposed CERCLA Administrative Cost Recovery Settlement; Cadie Auto Salvage Site, Belvidere...

    Science.gov (United States)

    2013-12-24

    ... Recovery Settlement; Cadie Auto Salvage Site, Belvidere, Boone County, Illinois AGENCY: Environmental... Auto Salvage Site in Belvidere, Boone County, Illinois with the following settling party: Helen E... reference the Cadie Auto Salvage Site, Belvidere, Boone County, Illinois and EPA Docket No. and should be...

  19. 76 FR 64943 - Proposed Cercla Administrative Cost Recovery Settlement; ACM Smelter and Refinery Site, Located...

    Science.gov (United States)

    2011-10-19

    ... Settlement; ACM Smelter and Refinery Site, Located in Cascade County, MT AGENCY: Environmental Protection... projected future response costs concerning the ACM Smelter and Refinery NPL Site (Site), Operable Unit 1..., Helena, MT 59626. Mr. Sturn can be reached at (406) 457-5027. Comments should reference the ACM Smelter...

  20. 75 FR 22785 - Proposed Administrative Settlement Agreement Under Section 122 of the Comprehensive Environmental...

    Science.gov (United States)

    2010-04-30

    ... Leaman Tank Lines, Inc. Superfund Site Located in Logan Township, Gloucester County, NJ AGENCY..., Inc. (the ``Settling Party'') pursuant to Section 122 of the Comprehensive Environmental Response, Compensation, and Liability Act (``CERCLA''), 42 U.S.C. 9622. The Settlement Agreement provides for Settling...

  1. 76 FR 51029 - Proposed CERCLA Administrative Cost Recovery Settlement; Carpenter Avenue Mercury Site, Iron...

    Science.gov (United States)

    2011-08-17

    ... Settlement; Carpenter Avenue Mercury Site, Iron Mountain, Dickenson County, MI AGENCY: Environmental... of past response costs concerning the Carpenter Avenue Mercury site in Iron Mountain, Dickenson...., mail code: C-14J, Chicago, Illinois 60604. Comments should reference the Carpenter Avenue Mercury site...

  2. 76 FR 71342 - Proposed CERCLA Administrative Cost Recovery Settlement; River Forest Dry Cleaners Site, River...

    Science.gov (United States)

    2011-11-17

    ... Settlement; River Forest Dry Cleaners Site, River Forest, Cook County, IL AGENCY: Environmental Protection... response costs concerning the River Forest Dry Cleaners site in River Forest, Cook County, Illinois with... code: C-14J, Chicago, Illinois 60604. Comments should reference the River Forest Dry Cleaners Site...

  3. 75 FR 34448 - Proposed CERCLA Administrative Cost Recovery Settlement; Great Lakes Container Corporation...

    Science.gov (United States)

    2010-06-17

    ... Settlement; Great Lakes Container Corporation Superfund Site, Coventry Rhode Island AGENCY: Environmental... and future response costs concerning the Great Lakes Container Corporation Superfund Site, located in...), Boston, MA 02109-3912, (617) 918-1216. Comments should reference the Great Lakes Container Corporation...

  4. Royal Wine Corporation d/b/a/ Royal Kedem (Herzog Wine Cellars), Oxnard, CA; Proposed Settlement of Clean Water Act Class II Administrative Penalty and Opportunity to Comment

    Science.gov (United States)

    Public Notice of Proposed Settlement of Clean Water Act Class II Administrative Penalty and Opportunity to Comment In the Matter of Royal Wine Corporation d/b/a/ Royal Kedem (Herzog Wine Cellars), Oxnard, California.

  5. 76 FR 42625 - International Settlements Policy Reform

    Science.gov (United States)

    2011-07-19

    ...] International Settlements Policy Reform AGENCY: Federal Communications Commission. ACTION: Notice of proposed rulemaking. SUMMARY: The Federal Communications Commission proposes to remove the International Settlements... proposes to remove the International Settlements Policy (ISP) from all U.S. international routes except...

  6. 25 CFR 900.125 - What shall a construction contract proposal contain?

    Science.gov (United States)

    2010-04-01

    ... organization shall also include in its construction contract proposal the following: (1) In the case of a... accept the tribally proposed standards; and (2) In the case of a contract for construction activities... methods (including national, regional, state, or tribal building codes or construction industry standards...

  7. 15 CFR 785.17 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Settlement. 785.17 Section 785.17... Settlement. (a) Settlements before issuance of a NOVA. When the parties have agreed to a settlement of the case prior to issuance of a NOVA, a settlement proposal consisting of a settlement agreement and order...

  8. 48 CFR 915.404-2-70 - Audit as an aid in proposal analysis.

    Science.gov (United States)

    2010-10-01

    ... ENERGY CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 915.404-2-70 Audit as an aid in proposal analysis. (a) When a contract price will be based on cost or pricing data...-reimbursement contracts, interim and final price redeterminations, and target and settlement of incentive...

  9. 29 CFR 102.151 - Settlement.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 2 2010-07-01 2010-07-01 false Settlement. 102.151 Section 102.151 Labor Regulations... Expenses § 102.151 Settlement. The applicant and the General Counsel may agree on a proposed settlement of... on a proposed settlement of an award before an application has been filed, the proposed settlement...

  10. 33 CFR 20.502 - Settlements.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Settlements. 20.502 Section 20... Settlements § 20.502 Settlements. (a) The parties may submit a proposed settlement to the ALJ. (b) The proposed settlement must be in the form of a proposed decision, accompanied by a motion for its entry. The...

  11. A proposal to assess the settlement and subsidence behaviour of noncohesive soils after wetting

    International Nuclear Information System (INIS)

    Hellweg, V.

    1981-01-01

    On the basis of the causes established for the Elbe-Seitenkanal dyke breach in 1976 - which was due a.o. to the settlement of the uniform fine sand placed-serial ground subsidence investigations according to a test method developed by the author were carried through in high-grade steel cylinders of 35 cm diameter and 70 cm height with three very different noncohesive soils to assess the subsidence behaviour after wetting. Besides a critical evaluation of the so far known methods for assessing ground subsidence and direct comparisons with other authors' results and usual laboratory test results, the processes inside the soil samples placed were carefully observed and analysed with the aid of the large experimental devices used. (orig./MSK) [de

  12. 75 FR 72830 - Medicare Program; Quality Improvement Organization (QIO) Contracts: Solicitation of Proposals...

    Science.gov (United States)

    2010-11-26

    ...] Medicare Program; Quality Improvement Organization (QIO) Contracts: Solicitation of Proposals From In-State... the Social Security Act (the Act) to provide at least 6 months' advance notice of the expiration dates of contracts with out- of-State Quality Improvement Organizations (QIOs) before renewing any of those...

  13. Proposed Georgia-Alabama-South Carolina system power marketing policy and subsequent contracts

    International Nuclear Information System (INIS)

    1994-01-01

    This is an Environmental Assessment (Assessment) (DOE/EA-0935) evaluating the Power Marketing Policy and Subsequent Contracts between Southeastern and its customers. The Assessment evaluates two alternatives and the no action alternative. The proposed action is to market the power and energy available in the Georgia-Alabama-South Carolina System during the next ten years, with new power sales contracts of ten-year durations, to the customers set forth in Appendix A of the Assessment. In addition to the proposed alternative, the Assessment evaluates the alternative of extending existing contracts under the current marketing policy

  14. 25 CFR 900.33 - Are all proposals to renew term contracts subject to the declination criteria?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Are all proposals to renew term contracts subject to the... Indian Affairs will not review the renewal of a term contract for declination issues where no material... been proposed by the Indian tribe or tribal organization. Proposals to renew term contracts with DOI...

  15. Proposed plan for a JAEA internationalization initiative (JII) (Contract research)

    Energy Technology Data Exchange (ETDEWEB)

    Bolton, Paul R; Kawanishi, Shunichi [Japan Atomic Energy Agency, Photo-Medical Research Center, Kizugawa, Kyoto (Japan); Mizuki, Jun' ichiro [Japan Atomic Energy Agency, Quantum Beam Science Directorate, Sayo, Hyogo (Japan)

    2011-01-15

    Concepts for a JAEA Internationalization Initiative, JII are presented. Following a general discussion of issues and recommendations for JII, a 'fast startup JII' is proposed in the form of fast start action items (FSAI). The FSAI represent a clear set of action items that can be implemented at the KPSI/PMRC site which would serve as a seed site for test and evaluation. A JAEA Internationalization Initiative that is guided by evaluation and tailored for JAEA as a whole can be established with appropriate oversight and tracking at each JAEA site by local JII teams. In addition to recommendations for the KPSI/PMRC seed site, the roles of the Quantum Beam Science Directorate (QuBS) leadership and the International Affairs Department (IAD) of JAEA are also discussed. Current KPSI/PMRC activities that are consistent with a JII are briefly presented. (author)

  16. Proposed plan for a JAEA internationalization initiative (JII) (Contract research)

    International Nuclear Information System (INIS)

    Bolton, Paul R.; Kawanishi, Shunichi; Mizuki, Jun'ichiro

    2011-01-01

    Concepts for a JAEA Internationalization Initiative, JII are presented. Following a general discussion of issues and recommendations for JII, a 'fast startup JII' is proposed in the form of fast start action items (FSAI). The FSAI represent a clear set of action items that can be implemented at the KPSI/PMRC site which would serve as a seed site for test and evaluation. A JAEA Internationalization Initiative that is guided by evaluation and tailored for JAEA as a whole can be established with appropriate oversight and tracking at each JAEA site by local JII teams. In addition to recommendations for the KPSI/PMRC seed site, the roles of the Quantum Beam Science Directorate (QuBS) leadership and the International Affairs Department (IAD) of JAEA are also discussed. Current KPSI/PMRC activities that are consistent with a JII are briefly presented. (author)

  17. 17 CFR 10.108 - Settlements.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Settlements. 10.108 Section 10... to the Commission; Settlements § 10.108 Settlements. (a) When offers may be made. Parties may at any time during the course of the proceeding propose offers of settlement. All offers of settlement shall...

  18. The Green Stamp in Power Supply Contracts - A proposal for the Brazilian Electricity Market

    Energy Technology Data Exchange (ETDEWEB)

    Estrocio, Joao Paulo

    2010-09-15

    The insertion of a certification mechanism for discriminatory energy supply contracts aiming to make it possible to contract exclusively clean and renewable energy is presented. With the increasing interest for sustainability and carbon emissions reduction, there's a growing demand for clean energy reflected in people's choices for cleaner products. Electricity in a power grid, however, is result of a set of sources or plants, and its operation or dispatch. A proposal for clean energy contracts is presented, providing the market and the clients with the ability to choose to buy exclusively renewable energy through the grid.

  19. Proposal for the award of a contract for the supply of Cabletron gigabit routers

    CERN Document Server

    2000-01-01

    This document concerns the award of a contract for the supply of Cabletron gigabit routers. Following a call for tenders (IT-2870/IT) sent on 14 July 2000 to 13 firms in three Member States, CERN received, by the closing date, tenders from four firms in one Member State. The Finance Committee is invited to agree to the negotiation of a contract with ACN (CH), the lowest bidder, for the supply of Cabletron gigabit routers for a total amount of 1 887 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: IE-100%.

  20. 76 FR 54465 - Proposed Settlement Agreement, Clean Air Act Citizen Suit

    Science.gov (United States)

    2011-09-01

    ... (24) months after issuing a finding of failure to submit State Implementation Plans (``SIPs'') meeting...) at issue. No later than 15 business days following signature on each notice related to a proposed or... excess emissions from sources during periods of startup, shutdown, or malfunction (``SSM'') that may be...

  1. 75 FR 35089 - Notice of Availability of the Record of Decision for Proposed Contract Award to House District of...

    Science.gov (United States)

    2010-06-21

    ... for Proposed Contract Award to House District of Columbia-Sentenced Felons and Criminal Aliens Within... proposed award of a contract to house approximately 1,380 federal, low-security, adult male District of... award of a contract to house approximately 1,380 federal, low-security, adult male DC-sentenced felons...

  2. Proposal for the award of an industrial services contract for software support for industrial controls

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Services contract for software support for industrial controls. Following a market survey carried out among 68 firms in twelve Member States, a call for tenders (IT-2711/ST) was sent on 12 April 2000 to nine firms and five consortia in eight Member States. By the closing date, CERN had received seven tenders from two firms and five consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the firm GTD (ES), the lowest bidder, for an initial period of three years from 1 October 2000, for a total amount not exceeding 4 500 000 Swiss francs, not subject to revision. The contract will include an option for two one-year extensions beyond the initial three-year period. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: ES?100%.

  3. Standard contract terms regulation in the proposal for a common European sales law

    NARCIS (Netherlands)

    Loos, M.B.M.

    2012-01-01

    In this paper, the regulation in standard contract terms in the proposal for a Commono European Sales Law (CESL) is compared with the regulation in the Unfair Terms Directive, the Draft Common Frame of Reference (DCFR) and the Vienna Sales Convention (CISG). The paper starts with an overview of the

  4. Proposal for a system of indicators to assess the visual quality of the urban landscape in informal settlements

    Directory of Open Access Journals (Sweden)

    Johana Andrea Mesa-Carranza

    2016-04-01

    Full Text Available Propuesta de un sistema de indicadores para evaluar la calidad visual del paisaje urbano en asentamientos informalesResumenLos asentamientos informales son producto de procesos espontáneos de urbanización y se conforman sin ninguna planificación oficial, generando exclusión social y marginalidad, las cuales repercuten negativamente en el aspecto físico del entorno urbano y en la calidad de vida de los habitantes. Este texto se enfoca en la construcción de los lineamientos de confort ambiental orientados a la calidad visual del paisaje urbano; a partir de una revisión bibliográfica descriptiva se presentan los diferentes autores y conceptos que definen al paisaje urbano; se identifican los principales componentes que lo conforman y, a partir de estos, se propone un sistema de indicadores para valorar su calidad visual, bajo la integración de factores inherentes a las dimensiones ecológica, estética y cultural, los cuales contribuyen a definir el diagnóstico de cada componente propuesto, además de establecer un sistema de evaluación que favorezca el mejoramiento de la calidad visual del paisaje urbano informal, proporcionando resultados que ayuden al proceso de diseño y a la preservación o el mejoramiento del mismo.Palabras clave: diseño del paisaje, diseño urbano, paisaje cultural, paisaje natural, protección del paisaje. Proposal for a system of indicators to assess the visual quality of the urban landscape in informal settlementsAbstractInformal settlements are the result of spontaneous processes of urbanization and are formed without any official planning, generating social exclusion and marginalization, which adversely affect the physical appearance of the urban environment and quality of life of the inhabitants. This text focuses on building environmental guidelines comfort-oriented visual quality of the urban landscape; from a descriptive literature review, there is a presentation of different authors and concepts that

  5. Proposed revision of the Cumberland System Power Marketing Policy and subsequent contracts

    International Nuclear Information System (INIS)

    1992-01-01

    Southeastern Power Administration has prepared an Environmental Assessment (DOE/EA-0811) evaluating the proposed revision of the Cumberland System Power Marketing Policy and Subsequent Contracts. The findings of the Environmental Assessment (EA) are: the only significant change from the existing policy will be the term of the contracts executed under the revised policy; and there will be no addition of major new generation resources; there will be no new loads; there will be no major changes in the operating parameters of power generation resources. This paper discusses the need for action, the alternative and the environmental impacts

  6. Proposal for the Award of a Blanket Purchase Contract for the Supply of PC Servers

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the supply and the hardware support of Windows compatible PC servers for a three-year period with a view to maintaining and evolving CERN's Windows infrastructure over the coming years. Following a market survey carried out among 38 firms in eleven Member States, a call for tenders (IT-2955/IT) was sent on 27 January 2003 to six firms in two Member States. By the closing date, CERN had received two tenders from two firms in one Member State. The Finance Committee is invited to agree to the negotiation of a three-year blanket purchase contract with ELONEX (CH), the lowest bidder complying with the specification, for the supply of Windows compatible PC servers for a total amount not exceeding 1 100 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: GB - 100%.

  7. Proposal for the award of an industrial support contract for radiation monitoring services for LEP dismantling

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Service contract for radiation monitoring services for LEP dismantling. Following a market survey carried out among 34 firms in nine Member States, a call for tenders (IT-2769/SL/LEP) was sent on 13 March 2000 to seven firms and three consortia in five Member States. By the closing date, CERN had received six tenders from three firms and three consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium ISS MULTISERVICE (CH), NFI (SE) and ISS GEBÄUDESERVICE (DE), the lowest technically qualified bidder, for radiation monitoring services for LEP dismantling for a total amount of 990 792 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH-59%, DE-26%, SE-15%.

  8. Proposal to negotiate, without competitive tendering, a blanket contract for an instant-reading dosimeter system

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract, without competitive tendering, for the supply, installation and maintenance of an instant-reading dosimeter system. Following a market survey (MS-3118/TIS) carried out among 28 firms in eleven Member States, a request for a quotation was sent to one firm on 3 October 2003. The Finance Committee is invited to agree to the negotiation of a blanket contract, without competitive tendering, with RADOS TECHNOLOGY (FI) for the supply, installation and maintenance of an instant-reading dosimeter system for a total amount not exceeding 2 100 000 euros (3 252 284 Swiss francs), subject to revision for inflation after 1 January 2007. The rate of exchange used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FI - 58%; CH - 38%; GB - 4%.

  9. 75 FR 34117 - Proposed CERCLA Section 122(h) Cost Recovery Settlement for the H.M. Quackenbush, Inc. Superfund...

    Science.gov (United States)

    2010-06-16

    ... and majority shareholder of H.M. Quackenbush, Inc., to pay EPA, in nine annual installments, $225,000.00, plus interest, for EPA's past response costs incurred at the Site. The Settling Party also agrees to pay $75,000.00 pursuant to a settlement with the Village of Herkimer into an interest-bearing...

  10. Challenging a court settlement: Concept, legal nature and methods of challenging in domestic and comparative law

    Directory of Open Access Journals (Sweden)

    Salma Marija

    2011-01-01

    Full Text Available In this paper the author offers analysis of rules regulating the challenging of a court settlement in light of the evolution and legal nature of the court settlement in domestic and comparative law (Austrian, German, and Hungarian laws. The method of the procedural challenge depended on the understanding whether the settlement is an agreement (contract between parties before the court or it is a decision of the court (on acceptance or rejection of the proposal of the parties to reach a settlement. In the earlier instance the method of challenge is by filing of an action, and in the latter instance it represents a form of a legal remedy, most often extraordinary legal remedy - request for repetition of a trial, against final and binding decision of the court by which the settlement was either accepted or rejected. Theoretical dilemma about the legal nature of the court settlement, had an effect on normative regulations, as well as on court practice. In the Serbian law, this dilemma was resolved by enactment of the Civil Procedure Code which explicitly regulates that court settlement is challenged by an action before the court. As a result of this, the idea of a court settlement, as a form of an agreement, prevailed in the legal system. However, considerable procedural effects of the court settlement cannot be ignored. The principal procedural effect is that the litigation is terminated. Further, the court settlement represents a form of an executive title.

  11. 78 FR 66040 - 30-Day Notice of Proposed Information Collection: HUD-Owned Real Estate-Sales Contract and Addendums

    Science.gov (United States)

    2013-11-04

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5683-N-91] 30-Day Notice of Proposed Information Collection: HUD-Owned Real Estate--Sales Contract and Addendums AGENCY: Office of the Chief... published a 30 day notice of proposed information collection entitled HUD-Owned Real Estate-Sales Contract...

  12. 39 CFR 962.26 - Settlement.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Settlement. 962.26 Section 962.26 Postal Service... CIVIL REMEDIES ACT § 962.26 Settlement. (a) Either party may make offers of settlement or proposals of... settlement terms to the Attorney General, as appropriate. [59 FR 51860, Oct. 13, 1994] ...

  13. 49 CFR 1016.306 - Settlement.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Settlement. 1016.306 Section 1016.306... Settlement. The applicant and agency counsel may agree on a proposed settlement of the award before final action on the application, either in connection with a settlement of the underlying proceeding, or after...

  14. 49 CFR 826.35 - Settlement.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Settlement. 826.35 Section 826.35 Transportation... Settlement. The applicant and agency counsel may agree on a proposed settlement of the award before final action on the application, either in connection with a settlement of the underlying proceeding, or after...

  15. 17 CFR 148.25 - Settlement.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Settlement. 148.25 Section 148... Considering Applications § 148.25 Settlement. The applicant may propose settlement of the award to the Commission before final action on the application, either in connection with a settlement of the adjudicatory...

  16. 31 CFR 501.710 - Settlement.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 3 2010-07-01 2010-07-01 false Settlement. 501.710 Section 501.710... the Enemy Act (TWEA) Penalties § 501.710 Settlement. (a) Availability. Either the Director or any..., propose an offer of settlement. The amount accepted in settlement may be less than the civil penalty that...

  17. 47 CFR 1.1525 - Settlement.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Settlement. 1.1525 Section 1.1525... Settlement. The applicant and Bureau counsel may agree on a proposed settlement of the award before final action on the application, either in connection with a settlement of the underlying proceeding, or after...

  18. 7 CFR 1.198 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Settlement. 1.198 Section 1.198 Agriculture Office of....198 Settlement. The applicant and agency counsel may agree on a proposed settlement of the award before final action on the application, either in connection with a settlement of the underlying...

  19. 24 CFR 14.320 - Settlement.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Settlement. 14.320 Section 14.320... Applications § 14.320 Settlement. The applicant and agency counsel may agree on a proposed settlement of the award before final action on the application, either in connection with a settlement of the underlying...

  20. 14 CFR 15.109 - Settlements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Settlements. 15.109 Section 15.109... Act of 1958 § 15.109 Settlements. (a) A publisher may not settle a claim with another party, for which... publisher submits a copy of the proposed settlement, and a statement justifying the settlement, to the Chief...

  1. 10 CFR 12.305 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Settlement. 12.305 Section 12.305 Energy NUCLEAR... Considering Applications § 12.305 Settlement. The applicant and the NRC counsel may agree on a proposed settlement of the award before final action on the application, either in connection with a settlement of the...

  2. 12 CFR 747.612 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Settlement. 747.612 Section 747.612 Banks and... Board Adjudications § 747.612 Settlement. The applicant and counsel for NCUA may agree on a proposed settlement of the award before final action on the application, either in connection with a settlement of the...

  3. Proposal for the award of an industrial support contract for dismantling LEP cooling and ventilation equipment

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Service contract for dismantling LEP cooling and ventilation equipment. Following a market survey carried out among 68 firms in fourteen Member States, a call for tenders (IT-2658/ST/SL) was sent on 11 February 2000 to 14 firms and one consortium in eight Member States. By the closing date, CERN had received nine tenders from seven firms and two consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the firm ZVVZ (CZ), the lowest bidder, for a total amount of 822 005 Swiss francs, not subject to revision. The contract will include options for additional dismantling work in the LEP structure, specified in the tender, for a total amount of 313 311 Swiss francs, not subject to revision, bringing the total amount to a maximum of 1 135 316 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CZ-100%.

  4. Proposal for the award of an industrial services contract for computer centre operations

    CERN Document Server

    2001-01-01

    This document concerns the award of an Industrial Services contract for Computer Centre operations. Following a market survey carried out among 40 firms in eleven Member States, a call for tenders (IT-2871/IT) was sent on 9 March 2001 to nine firms and one consortium consisting of two firms in six Member States. By the closing date, CERN had received three tenders from two firms and one consortium in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium DCS (CH) - INTRASOFT (GR), the lowest bidder, for an initial period of three years from 1 October 2001 for a total amount of 2 196 588 Swiss francs, not subject to revision until 30 September 2002. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH-55% ; GR-45%.

  5. 48 CFR 49.110 - Settlement negotiation memorandum.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Settlement negotiation... CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.110 Settlement negotiation memorandum. (a) The TCO shall, at the conclusion of negotiations, prepare a settlement negotiation memorandum...

  6. Proposal for the award of an industrial support contract for cooling water treatment

    CERN Document Server

    1999-01-01

    This document concerns the award of an Industrial Support contract for cooling water treatment for LEP, PS and SPS. Following a market survey carried out among 46 firms in twelve Member States, a call for tenders (IT-2557/ST) was sent on 26 July 1999 to seven firms and two consortia in five Member States. By the closing date, CERN had received five tenders from firms and consortia in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium AQUAZUR (FR) and SCHILLING CHEMIE (DE), the lowest bidder after realignment, for an initial period of three years, starting on 1 January 2000, for a total amount not exceeding 976 482 Swiss francs, not subject to revision until 31 December 2001. The contract will include options for two further one-year extensions beyond the initial three year period. The consortium has indicated the following distribution by country of the work covered by this adjudication proposal: FR - 52% and DE - 48%.

  7. 78 FR 57873 - 60-Day Notice of Proposed Information Collection: HUD-Owned Real Estate-Sales Contract and Addendums

    Science.gov (United States)

    2013-09-20

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5687-N-36] 60-Day Notice of Proposed Information Collection: HUD-Owned Real Estate--Sales Contract and Addendums AGENCY: Office of the Assistant... Information Collection Title of Information Collection: HUD-Owned Real Estate--Sales Contract and Addendums...

  8. 48 CFR 49.108-3 - Settlement procedure.

    Science.gov (United States)

    2010-10-01

    ... MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-3 Settlement procedure. (a) Contractors shall settle with subcontractors in general conformity with the policies and principles relating to settlement...

  9. Proposal for the increase of the contract amounts for LHC civil engineering construction and civil engineering consultancy contracts

    CERN Document Server

    2001-01-01

    This document concerns the increase of the contract amounts for LHC civil engineering construction contracts and civil engineering consultancy contracts. The Finance Committee is invited to agree to the increase of the contract amounts with: - the joint venture TEERAG-ASDAG (AT), C. BARESEL (DE) and LOCHER (CH) for civil engineering construction, package 1, for a revised total amount of 91 500 000 Swiss francs, subject to revision; - the joint venture EDF (FR) and KNIGHT&PIESOLD (GB) for the provision of civil engineering consultancy services, package 1, for a revised total amount of 14 400 000 Swiss francs, subject to revision; - the joint venture TAYLOR WOODROW (GB), AMEC (GB) and SPIE BATIGNOLLES (FR) for civil engineering construction, package 3a, for a revised total amount of 118 000 000 Swiss francs, subject to revision; - the joint venture BROWN&ROOT (GB), INTECSA (ES) and HIDROTECNICA (PT) for the provision of civil engineering consultancy services, package 3, for a revised total amount of 14 ...

  10. Proposal to Negotiate an Amendment to an Existing Contract and Several Contracts for the Supply and Assembly of the LHC Short Straight Section Cryostats

    CERN Document Server

    2002-01-01

    Following the insolvency of a major contractor, CERN proposes to negotiate an amendment to an existing contract and to place several contracts for the supply of 360 LHC arc short straight section cryostats and their assembly, eight spare cryostat units and components for 64 LHC dispersion suppressor short straight section cryostats. The Finance Committee is therefore invited to approve an amendment to an existing contract with the consortium: &8721; INTERTEC (DK) - CEGELEC (FR) - SPIE TRINDEL (FR) to include assembly of the LHC arc short straight sections, for an additional amount of 4 088 470 euros (6 205 480 Swiss francs), subject to revision for inflation after 31 December 2002; the consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal : DK - 52%, FR - 48%; and to the negotiation of contracts for the supply of related major components with the firms: &8721; SES (SK) for the supply of vacuum vessels for an amount of 5 538 533 euros...

  11. Proposal to negotiate a contract, without competitive tendering, for the supply and installation of pipework for the new hostel

    CERN Document Server

    2005-01-01

    This document concerns the proposal to negotiate a contract for the supply and installation of new piping as preparatory work for the construction of a third on-site hostel. For the reasons explained in this document, the Finance Committee is invited to approve a contract with the SERVICES INDUSTRIELS DE GENEVE (SIG) (CH), without competitive tendering, for the supply and installation of new piping for an amount not exceeding 700 000 Swiss francs, not subject to revision.

  12. 17 CFR 201.240 - Settlement.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Settlement. 201.240 Section... of Practice Initiation of Proceedings and Prehearing Rules § 201.240 Settlement. (a) Availability... party to a proceeding already instituted, may, at any time, propose in writing an offer of settlement...

  13. 28 CFR 24.304 - Settlement.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Settlement. 24.304 Section 24.304... DEPARTMENT OF JUSTICE ADMINISTRATIVE PROCEEDINGS Procedures for Considering Applications § 24.304 Settlement. A prevailing party and Department counsel may agree on a proposed settlement of an award before...

  14. 29 CFR 101.7 - Settlements.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 2 2010-07-01 2010-07-01 false Settlements. 101.7 Section 101.7 Labor Regulations Relating... Section 10 (a) to (i) of the Act and Telegraph Merger Act Cases § 101.7 Settlements. Before any complaint... for the submission and consideration of facts, argument, offers of settlement, or proposals of...

  15. 15 CFR 18.19 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Settlement. 18.19 Section 18.19... Procedures for Considering Applications § 18.19 Settlement. The applicant and agency counsel may agree on a proposed settlement of the award before final action on the application, either in connection with a...

  16. 49 CFR 6.29 - Settlement.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Settlement. 6.29 Section 6.29 Transportation... PROCEEDINGS Procedures for Considering Applications § 6.29 Settlement. The applicant and agency counsel may agree on a proposed settlement of the award before final action on the application, either in connection...

  17. 22 CFR 134.25 - Settlement.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Settlement. 134.25 Section 134.25 Foreign... Considering Applications § 134.25 Settlement. The applicant and the Department of State may agree on a proposed settlement of the award before final action on the application, either in connection with a...

  18. 17 CFR 201.54 - Settlement.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Settlement. 201.54 Section 201... Regulations Pertaining to the Equal Access to Justice Act § 201.54 Settlement. The applicant and counsel for the Office or Division of the Commission may agree on a proposed settlement of the award before final...

  19. 40 CFR 17.24 - Settlement.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Settlement. 17.24 Section 17.24... JUSTICE ACT IN EPA ADMINISTRATIVE PROCEEDINGS Procedures for Considering Applications § 17.24 Settlement. A prevailing party and EPA counsel may agree on a proposed settlement of an award before final...

  20. 14 CFR 14.25 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Settlement. 14.25 Section 14.25 Aeronautics... IMPLEMENTING THE EQUAL ACCESS TO JUSTICE ACT OF 1980 Procedures for Considering Applications § 14.25 Settlement. The applicant and agency counsel may agree on a proposed settlement of the award before final action...

  1. 24 CFR 1720.180 - Settlements.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Settlements. 1720.180 Section 1720... Proceedings General Provisions § 1720.180 Settlements. Parties may propose in writing, at any time during the course of a proceeding, offers of settlement which shall be submitted to the Secretary. If determined to...

  2. 39 CFR 960.17 - Settlement.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Settlement. 960.17 Section 960.17 Postal Service... ACT IN POSTAL SERVICE PROCEEDINGS Procedures for Considering Applications § 960.17 Settlement. The applicant and the Postal Service may agree on a proposed settlement of the award before final action on the...

  3. 39 CFR 958.23 - Settlement.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Settlement. 958.23 Section 958.23 Postal Service..., CLEAN-UP COSTS AND DAMAGES FOR VIOLATION OF HAZARDOUS MATERIAL REGULATIONS § 958.23 Settlement. Either party may make offers of settlement or proposals of adjustment at any time. The Determining Official has...

  4. 5 CFR 2430.10 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Settlement. 2430.10 Section 2430.10... FEDERAL LABOR RELATIONS AUTHORITY AWARDS OF ATTORNEY FEES AND OTHER EXPENSES § 2430.10 Settlement. The applicant and the General Counsel may agree on a proposed settlement of the award before final action on the...

  5. 19 CFR 212.24 - Settlement.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Settlement. 212.24 Section 212.24 Customs Duties... IMPLEMENTATION OF THE EQUAL ACCESS TO JUSTICE ACT Procedures for Considering Applications § 212.24 Settlement. The applicant and the Commission may agree on a proposed settlement of the award before final action...

  6. 12 CFR 1705.24 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Settlement. 1705.24 Section 1705.24 Banks and... Consideration of the Application for Award § 1705.24 Settlement. The applicant and agency counsel may agree on a proposed settlement of an award before the final decision on the application for award is made, either in...

  7. 10 CFR 1023.324 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Settlement. 1023.324 Section 1023.324 Energy DEPARTMENT OF... Justice Act Procedures for Considering Applications § 1023.324 Settlement. The applicant and agency counsel may agree on a proposed settlement of the award before final action on the application, either in...

  8. 14 CFR 1262.305 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Settlement. 1262.305 Section 1262.305... PROCEEDINGS Procedures for Considering Applications § 1262.305 Settlement. The applicant and agency counsel may agree on a proposed settlement of the award before final action on the application, either in...

  9. 15 CFR 280.219 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Settlement. 280.219 Section 280.219... Enforcement § 280.219 Settlement. (a) Cases may be settled before service of a charging letter. In cases in which settlement is reached before service of a charging letter, a proposed charging letter will be...

  10. 45 CFR 13.24 - Settlements.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Settlements. 13.24 Section 13.24 Public Welfare... ACT IN AGENCY PROCEEDINGS Procedures for Considering Applications § 13.24 Settlements. The applicant and the agency's litigating party may agree on a proposed settlement of the award at any time prior to...

  11. 29 CFR 2204.306 - Settlement.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Settlement. 2204.306 Section 2204.306 Labor Regulations... Procedures for Considering Applications § 2204.306 Settlement. The applicant and the Secretary may agree on a proposed settlement of the award before final action on the application, either in connection with a...

  12. 5 CFR 2610.306 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 3 2010-01-01 2010-01-01 false Settlement. 2610.306 Section 2610.306... ACCESS TO JUSTICE ACT Procedures for Considering Applications § 2610.306 Settlement. The applicant and agency counsel may agree on a proposed settlement of the award before final action on the application...

  13. 29 CFR 16.303 - Settlement.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Settlement. 16.303 Section 16.303 Labor Office of the Secretary of Labor EQUAL ACCESS TO JUSTICE ACT Procedures for Considering Applications § 16.303 Settlement. The applicant and agency counsel may agree on a proposed settlement of the award before final action...

  14. 15 CFR 766.18 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Settlement. 766.18 Section 766.18... PROCEEDINGS § 766.18 Settlement. (a) Cases may be settled before service of a charging letter. In cases in which settlement is reached before service of a charging letter, a proposed charging letter will be...

  15. 12 CFR 625.20 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Settlement. 625.20 Section 625.20 Banks and... UNDER THE EQUAL ACCESS TO JUSTICE ACT Procedures for Considering Applications § 625.20 Settlement. A prevailing party and the FCA through its counsel may agree on a proposed settlement of an award at any time...

  16. Sound Settlements

    DEFF Research Database (Denmark)

    Mortensen, Peder Duelund; Hornyanszky, Elisabeth Dalholm; Larsen, Jacob Norvig

    2013-01-01

    Præsentation af projektresultater fra Interreg forskningen Sound Settlements om udvikling af bæredygtighed i det almene boligbyggerier i København, Malmø, Helsingborg og Lund samt europæiske eksempler på best practice......Præsentation af projektresultater fra Interreg forskningen Sound Settlements om udvikling af bæredygtighed i det almene boligbyggerier i København, Malmø, Helsingborg og Lund samt europæiske eksempler på best practice...

  17. Proposal for the award of a contract, without competitive tendering, for the maintenance of uninterruptable power supply systems

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract, without competitive tendering, for the maintenance of uninterruptable power supply systems. The Finance Committee is invited to agree to the negotiation of a contract, without competitive tendering, for the maintenance of uninterruptable power supply systems with MGE (FR) for a total amount of 575 000 euros (911 000 Swiss francs), covering an initial period of five years, subject to revision for inflation after 1 January 2007. The contract will include options for two one-year extensions beyond the initial five-year period. The amount in Swiss francs has been calculated using the present rate of exchange. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FR - 100%.

  18. Proposal for the award of a contract, without competitive tendering, for the maintenance of low-voltage switchgear

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract, without competitive tendering, for the maintenance of low-voltage switchgear. The Finance Committee is invited to agree to the negotiation of a contract, without competitive tendering, for the maintenance of low-voltage switchgear with HAZEMEYER (FR) for a total amount of 385 000 euros (610 000 Swiss francs), covering an initial period of five years, subject to revision for inflation after 1 January 2007. The contract will include options for two one-year extensions beyond the initial five-year period. The amount in Swiss francs has been calculated using the present rate of exchange. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FR - 100%.

  19. 76 FR 46840 - Time Extension To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-08-03

    ... Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a Feature of the... Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a feature of the... considered timely only if it is received in the office of the Lease of Power Privilege Coordinator by or...

  20. 77 FR 1723 - Proposed Concession Contract for Shenandoah National Park-Alternative Formula for Calculating...

    Science.gov (United States)

    2012-01-11

    ... we include in concession contracts a franchise fee payable to the Government that is based upon... establish the required minimum franchise fee for the new contract, that fee will reflect speculative... concessioner offers to meet or exceed the minimum franchise fee that we would establish under the standard LSI...

  1. Sound Settlements

    DEFF Research Database (Denmark)

    Mortensen, Peder Duelund; Hornyanszky, Elisabeth Dalholm; Larsen, Jacob Norvig

    2013-01-01

    Præsentation af projektresultater fra Interreg forskningen Sound Settlements om udvikling af bæredygtighed i det almene boligbyggerier i København, Malmø, Helsingborg og Lund samt europæiske eksempler på best practice...

  2. 77 FR 58989 - Proposed CERCLA Administrative Cost Recovery Settlement for the Buckbee-Mears Co. Superfund Site...

    Science.gov (United States)

    2012-09-25

    ... paid $150,000 attributable to the costs of marketing and selling the Properties; (b) The Bank will pay... ENVIRONMENTAL PROTECTION AGENCY [FRL-9720-7] Proposed CERCLA Administrative Cost Recovery... costs concerning the Buckbee-Mears Co. Superfund Site located in Cortland, Cortland County, New York...

  3. Requirements for Space Settlement Design

    Science.gov (United States)

    Gale, Anita E.; Edwards, Richard P.

    2004-02-01

    When large space settlements are finally built, inevitably the customers who pay for them will start the process by specifying requirements with a Request for Proposal (RFP). Although we are decades away from seeing the first of these documents, some of their contents can be anticipated now, and provide insight into the variety of elements that must be researched and developed before space settlements can happen. Space Settlement Design Competitions for High School students present design challenges in the form of RFPs, which predict basic requirements for space settlement attributes in the future, including structural features, infrastructure, living conveniences, computers, business areas, and safety. These requirements are generically summarized, and unique requirements are noted for specific space settlement locations and applications.

  4. 48 CFR 49.109-7 - Settlement by determination.

    Science.gov (United States)

    2010-10-01

    ... CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.109-7 Settlement by determination. (a... determination of the amount due consistent with the termination clause, including any cost principles...

  5. Proposal for the award of an industrial support contract for indoor fitting work at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for indoor fitting work (carpentry, glazing, venetian and roller blinds) at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the firm ROLAND COSTA MENUISERIE (CH), the lowest bidder, for the provision of indoor fitting work at CERN, for three years for a total amount not exceeding 1 213 403 Swiss francs, not subject to revision for two years. The contract will include options for two one-year extensions beyond the initial three-year period.

  6. Proposal for the award of a contract for the maintenance and operation of CERN's sewage installations

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for the maintenance and operation of CERN's sewage installations. The Finance Committee is invited to agree to the negotiation of a contract with VALLIER ASSAINISSEMENT (FR), the lowest bidder, for the maintenance and operation of CERN's sewage installations for a period of three years for a total amount of 1 745 897 Swiss francs, not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period.

  7. Human settlements

    CSIR Research Space (South Africa)

    Van Niekerk, Cornelia W

    2017-09-01

    Full Text Available risk of deaths and injuries by drowning in floods and migration- related health effects. • Increased migration, which can result in human suffering, human rights violations, conflicts and political instability. • Loss of property and livelihoods.... The vulnerability of settlements in southern Africa is impacted by various and complex socio-economic processes related to the cultural, political and institutional contexts and demographic pressure, as well as specific high-risk zones susceptible to flash floods...

  8. 48 CFR 249.110 - Settlement negotiation memorandum.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Settlement negotiation memorandum. 249.110 Section 249.110 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 249.110 Settlement negotiation memorandum. Follow...

  9. Proposal for the award of a contract for the supply and installation of pipelines for the LHC accelerator tunnel

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply and installation of pipelines for the LHC accelerator tunnel. Following a market survey carried out among 92 firms in fifteen Member States, a call for tenders (IT-2682/ST/LHC) was sent on 7 September 2001 to seven firms, seven consortia consisting of two firms and three consortia consisting of four firms, in twelve Member States. By the closing date, CERN had received 11 tenders from five firms and six consortia in ten Member States. The Finance Committee is invited to agree to the negotiation of a contract with RENCO (IT), the lowest compliant bidder, for the supply and installation of pipelines for the LHC accelerator tunnel for a total amount of 21 995 304 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: IT - 100%.

  10. Proposal for the award of a contract for the upgrade of clean and waste water systems for the LHC

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the upgrade of clean and waste water systems for the LHC. Following a market survey carried out among 61 firms in thirteen Member States, a call for tenders (IT-3176/ST/LHC) was sent on 28 May 2003 to four firms and four consortia in six Member States. By the closing date, CERN had received six tenders from two firms and four consortia in five Member States. The Finance Committee is invited to agree to the negotiation of a contract with ABB (CH), the lowest bidder, for the upgrade of clean and waste water systems for the LHC for a total amount of 920 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: DE - 35%; FR - 31%; CH - 17%; SE - 13%; DK - 4%.

  11. Proposal for the award of a contract for the assembly of MQ-DS type cold masses for the LHC

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the assembly of 32 MQ-DS type cold masses for the short straight sections of the dispersion suppressor and matching regions of the LHC. Following a call for tenders (IT-3062/AT/LHC) sent on 5 September 2003 to six firms in three Member States, CERN received two tenders from two firms in two Member States. The Finance Committee is invited to agree to the negotiation of a contract with ACCEL INSTRUMENTS (DE), for the assembly of MQ-DS type cold masses of two different dimensions for a total amount of 4 939 194 euros (7 636 000 Swiss francs), not subject to revision. The rate of exchange used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: DE - 72 %; GB - 23%; IT - 5%.

  12. Proposal for the award of a contract for the wood construction work for the Globe of Innovation project

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the wood construction work for the Globe of Innovation project. A call for tenders (IT-3260/ST/GIR) was sent on 31 October 2003 to twelve firms in one Member State. By the closing date, CERN had received five tenders from four firms and one consortium. The Finance Committee is invited to agree to the negotiation of a contract with CIB (CH), the lowest bidder, for the wood construction work for the Globe of Innovation project for an estimated amount not exceeding 820 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH - 100%.

  13. Proposal for the award of three contracts for the supply and delivery of liquid nitrogen

    CERN Document Server

    2001-01-01

    This document concerns the award of three contracts for the supply and delivery of liquid nitrogen. A call for tenders (IT-3016/LHC) was sent on 21 September 2001 to 24 firms in eight Member States. By the closing date, CERN had received tenders from four firms in one Member State. For the reasons explained in this document, the Finance Committee is invited to agree to the negotiation of the following three contracts: - a contract with PRAXAIR (FR), the lowest bidder, for the supply of up to 20 000 metric tons of liquid nitrogen over a period of three years for an amount not exceeding 2 486 000 Swiss francs, not subject to revision. - a contract with MESSER FRANCE (FR), the second lowest bidder, for the supply of up to 15 000 metric tons of liquid nitrogen over a period of three years for an amount not exceeding 1 292 542 euros (1 905 000 Swiss francs), not subject to revision. The rate of exchange which has been used is that stipulated in the tender. - a contract with AIR PRODUCTS (FR), the third lowest bidd...

  14. Proposal for the award of a contract for software support services for industrial control systems

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for software support services for industrial control systems, including maintenance of existing systems and development of new applications. The Finance Committee is invited to agree to the negotiation of a contract with the consortium ASSYSTEMS (FR) - INBIS (GB), the lowest bidder, for software support services for industrial control systems, including maintenance of existing systems and development of new applications, for a period of three years for a total amount not exceeding 1 281 057 euros (1 998 530 Swiss francs), not subject to revision for the first two years. The rate of exchange used is that stipulated in the tender. The contract will include options for two one-year extensions beyond the initial three-year period.

  15. Proposal for the award of an industrial support contract for operation of the CERN telephone system

    CERN Document Server

    1999-01-01

    This document concerns the award of an industrial support contract for operation of the CERN telephone system. Following a market survey carried out among 22 firms in eight Member States, a call for tenders (IT-2655/ST) was sent on 27 August 1999 to three firms and two consortia in four Member States. By the closing date, CERN had received three tenders from one firm and two consortia in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium MERROW (UK) ? DCS (CH) the lowest bidder, for an initial period of three years from 1st January 2000, for a total amount not exceeding 850 000 Swiss francs, not subject to revision until 31 December 2000. The contract will include an option for two one-year extensions beyond the initial three-year period.

  16. Proposal for the award of an industrial support contract for transport and handling services

    CERN Document Server

    1999-01-01

    This document concerns the award of an industrial support contract for transport and handling services. Following a market survey carried out among 49 firms in nine Member States, a call for tenders (IT-2395/ST/Revised) was sent on 7 April 1999 to two firms and six consortia in seven Member States. By the closing date, CERN had received six tenders. The Finance Committee is invited to agree to the negotiation of a contract with the consortium DELATTRE-LEVIVIER (FR) ? BELLELI (IT) ? SETROVA (PT) the lowest bidder complying with the specification, for an initial period of three years, from 1st May 2000, for a total amount not exceeding 22 000 000 Swiss francs, not subject to revision until 30 April 2003. The contract will include an option for two one-year extensions beyond the initial three-year period.

  17. Proposal for the award of a contract for industrial support for logistics and stores operations

    CERN Document Server

    1999-01-01

    This document concerns the award of a contract for industrial support for logistics and stores operations. Following a market survey carried out among 59 firms in ten Member States, a call for tenders (IT-2401/SPL/Revised) was sent on 11 March 1999 to five firms and four consortia in five Member States. By the closing date, CERN had received eight tenders from five Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium ISS GEBÄUDESERVICE (DE) - ISS SERVISYSTEM (CH) the lowest bidder complying with the specification, for industrial support for logistics and stores operations over a period of three years, starting on 1st January 2000, for a total amount of 3 830 000 Swiss francs, not subject to revision. The contract will include an option for two one-year extensions beyond the initial three-year period.

  18. 76 FR 27380 - Proposed Information Collection (Offer To Purchase and Contract of Sale) Activity: Comment Request

    Science.gov (United States)

    2011-05-11

    ... To Purchase and Contract of Sale) Activity: Comment Request AGENCY: Veterans Benefits Administration, Department of Veterans Affairs. ACTION: Notice. SUMMARY: The Veterans Benefits Administration (VBA... collection of information; (3) ways to enhance the quality, utility, and clarity of the information to be...

  19. Proposal to endorse the award of a contract for the supply of a juniper T320 network router

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the supply of a JUNIPER T320 Network Router. The Finance Committee is invited to endorse the CERN Management's decision to negotiate a contract with QWEST COMMUNICATION (USA) for the supply of a JUNIPER T320 Network Router for a total amount not exceeding 265 000 US dollars (350 000 Swiss francs). The Finance Committee is also requested to approve the negotiation of a maintenance contract for a value not exceeding 50 000 US dollars (66 000 Swiss francs) for three years and the option to purchase additional network interfaces for a value not exceeding 100 000 US dollars (132 000 Swiss francs) bringing the total amount to 415 000 US dollars (548 000 Swiss francs), not subject to revision. CERN's contribution will not exceed 90 000 Swiss francs. The amounts in Swiss francs have been calculated using the present rate of exchange. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CA - 100%.

  20. Proposal for the award of an industrial services contract for maintenance of fire and gas detection and evacuation alarm systems

    CERN Document Server

    2001-01-01

    This document concerns the award of an Industrial Services contract for maintenance of fire and gas detection and evacuation alarm systems. Following a market survey carried out among 48 firms in fourteen Member States, a call for tenders (IT-2818/ST) was sent on 15 December 2000 to four firms and three consortia, each consisting of two firms, in five Member States. By the closing date, CERN had received tenders from one firm and three consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium SCHRACK SECONET (AT) - SOTEB (FR), the lowest bidder, for an initial period of three years from 1 October 2001 for an amount not exceeding 5 800 000 Swiss francs, not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal: AT-50%, FR-50%.

  1. Proposal for the award of an industrial services contract for installation and removal of cables for CERN accelerators

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Services contract for installation and removal of cables for CERN accelerators. Following a market survey carried out among 128 firms in sixteen Member States, a call for tenders (IT-2760/ST) was sent on 2 June 2000 to eight firms and six consortia, four consisting of two firms, one consisting of three firms and one of four firms, in nine Member States. By the closing date, CERN had received tenders from one firm and six consortia, in nine Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium FABRICOM (BE) - AMSE (FR), the lowest bidder, for an initial period of three years from 1 July 2001 for a total amount of 18 000 000 Swiss francs, not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal: PL-40%, FR-35%, BE-2...

  2. Proposal for the award of an industrial services contract for operation of the hostels, apartments and ancillary premises

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Services contract for operation of the hostels, apartments and ancillary premises run by the CERN Housing Service. Following a market survey carried out among 32 firms in ten Member States, a call for tenders (IT-2404/AS/Rev.) was sent on 5 April 2000 to one firm and three consortia in four Member States. By the closing date, CERN had received tenders from the firm and the three consortia. The Finance Committee is invited to agree to the negotiation of a contract with the consortium VIENNA INTERNATIONAL HOTEL MANAGEMENT (AT) - SEREG (CH), the lowest bidder, for an initial period of five years, to enter into force on 1 January 2001, for a total amount of 6 871 850 Swiss francs, not subject to revision until 31 December 2001. The contract will include an option for two one-year extensions beyond the initial five-year period. The consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH-60%, AT-...

  3. Proposal for the award of a contract for the provision of cooling water treatment services

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for cabling and minor mechanical work on components of CERN accelerators and experiments. Following a market survey carried out among 62 firms in fifteen Member States, a call for tenders (IT-3214/EST/A) was sent on 1 August 2003 to three firms and two consortia in four Member States. By the closing date, CERN had received four tenders from four consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium AMEC SPIE (FR) - CEGELEC (FR) - AMEC SPIE (NL), the lowest bidder, for cabling and minor mechanical work on components of CERN accelerators and experiments for a total amount not exceeding 1 040 968 euros (1 608 915 Swiss francs), covering an initial period of three years starting on 1 January 2004, not subject to revision. The rate of exchange used is that stipulated in the tender. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium ...

  4. Proposal for the award of a contract for the maintenance of industrial transport and handling equipment

    CERN Document Server

    European Organization for Nuclear Research

    2002-01-01

    This document concerns the award of a contract for the maintenance of industrial transport and handling equipment. Following a market survey carried out among 145 firms in sixteen Member States, a call for tenders (IT-3049/ST) was sent on 8 May 2002 to two firms and four consortia, one consortium consisting of three firms and three consortia consisting of two firms, in three Member States. By the closing date, CERN had received six tenders from six consortia in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium CEGELEC (FR), SPIE-TRINDEL (FR), ELECTRON (NL) and FENWICK-LINDE (FR), the lowest bidder after alignment, for the maintenance of industrial transport and handling equipment for a total amount of 2 973 280 euros (4 346 900 Swiss francs), covering an initial period of three years starting on 1 October 2002, subject to revision for inflation from 1 October 2005. The contract will include an option for two further one-year extensions beyond t...

  5. Proposal to negotiate an amendment to an existing contract for the supply of superconducting wire for the LHC corrector magnets

    CERN Document Server

    2005-01-01

    This document concerns the proposal to negotiate an amendment to an existing contract for the supply of superconducting wire for the LHC corrector magnets. For the reasons explained in this document, the Finance Committee is invited to approve an amendment to an existing contract with the firm ALSTOM (FR) for the supply of an additional 1 270 km of superconducting wire (Types 1 and 2) for an amount of 257 549 euros (402 679 Swiss francs), subject to revision for inflation, bringing the total to a maximum amount of 2 814 170 euros (4 399 955 Swiss francs), subject to revision for inflation. The amounts in Swiss francs have been calculated using the present rate of exchange.

  6. Proposal for the award of a contract, without competitive tendering, for the supply of electricity

    CERN Document Server

    2000-01-01

    This document concerns the award of a contract, without competitive tendering, for the supply of electricity for the period from January 2001 until 30 June 2003. On 13 January 2000 a market survey was sent to 43 firms in sixteen Member States. Following this market survey, CERN received an unsolicited offer from EDF/EOS. With a view to verifying the competitiveness of the offer, three firms and one consortium in four Member States, qualified from the market survey, were requested to submit quotations. CERN received three quotations from two firms and the consortium which indeed confirmed that the offer from EDF/EOS was very competitive. The Finance Committee is invited to agree to the negotiation of a contract with the consortium EDF (FR)/EOS (CH), which submitted the unsolicited offer, for the supply of electricity until June 2003 for a total estimated amount, based on the present schedules of the accelerators for the associated period, of 290 000 000 French francs, not subject to revision. At the present ra...

  7. 48 CFR 2052.215-79 - Contract award and evaluation of proposals.

    Science.gov (United States)

    2010-10-01

    ... offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to... discussions with offerors. The Government reserves the right to seek proposal clarifications (e.g., capability... competition among the most highly rated proposals. (e) The Government reserves the right to make an award on...

  8. Proposal for the award of a blanket contract for the supply of encapsulated-winding dry-type power transformers

    CERN Document Server

    2000-01-01

    This document concerns the award of a blanket contract for the supply of encapsulated-winding dry-type power transformers. Following a market survey carried out among 75 firms in seventeen Member States, a call for tenders (IT-2745/ST) was sent on 5 May 2000 to eight firms in four Member States. By the closing date, CERN had received tenders from six firms in four Member States. The Finance Committee is invited to agree to the negotiation of a blanket contract with TESAR (IT), the lowest bidder, for the supply of encapsulated-winding dry-type power transformers for a total amount of 6 150 000 000 Italian lira, not subject to revision until 31 December 2002. At the exchange rate stipulated in the tender, this amount is equivalent to approximately 5 000 000 Swiss francs. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: IT - 78%, NO - 17% and DE - 5%.

  9. Proposal for the Award of a Contract for the Supply of Industrial Pressure Transducers for the LHC

    CERN Document Server

    2002-01-01

    This document concerns the award of a contract for the supply of industrial pressure transducers for the LHC. Following a market survey carried out among 47 firms in eight Member States and a price enquiry (DO-19000/LHC/LHC) for qualifying prototypes sent to 12 firms in three Member States, a call for tenders (IT-2815/LHC/LHC) was sent on 19 September 2002 to two firms in one Member State. By the closing date, CERN had received two tenders from two firms. The Finance Committee is invited to agree to the negotiation of a contract with BAUMER ELECTRIC (CH), the lowest bidder, for the supply of 594 pressure transducers for a total amount of 343 028 Swiss francs, not subject to revision, with options for up to 60 additional pressure transducers, for an additional amount of 34 649 Swiss francs, not subject to revision, bringing the total amount to 377 677 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: ...

  10. Proposal for the award of a blanket contract for the supply, installation and maintenance of the LHC access control system

    CERN Document Server

    2004-01-01

    This document concerns the award of a blanket contract for the supply, installation and maintenance of the LHC access control system. Following a market survey carried out among 134 firms in fifteen Member States, a call for tenders (IT-3026/TS/LHC) was sent on 22 January 2004 to eight firms and eight consortia in six Member States. By the closing date, CERN had received nine tenders from two firms and seven consortia in five Member States. The Finance Committee is invited to agree to the negotiation of a blanket contract with the consortium CEGELEC CENTRE EST (FR) - CEGELEC (NL), the lowest technically compliant bidder, for the supply, installation and maintenance of the LHC access control system for a total amount not exceeding 4 600 000 euros (7 141 000 Swiss francs), subject to revision for inflation from 1 January 2007. The rate of exchange used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FR - ...

  11. Proposal for the award of a contract for the assembly on the CERN site of interconnections for the LHC machine

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the assembly on the CERN site of interconnections for the LHC machine. Following a market survey carried out among 70 firms in fourteen Member States, a call for tenders (IT-3099/AT/LHC) was sent on 14 April 2003 to one firm and four consortia in five Member States. By the closing date, CERN had received three tenders from three consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium INEO (FR), ENDEL (FR) and GTI (NL), the lowest bidder, for the assembly on the CERN site of interconnections for the LHC machine for a total amount of 6 792 836 euros (10 475 917 Swiss francs), subject to revision for inflation after 1 January 2006. The rate of exchange used is that stipulated in the tender. The consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal: NL - 51%; FR - 49%.

  12. 7 CFR 1780.75 - Contract provisions.

    Science.gov (United States)

    2010-01-01

    ... AGRICULTURE (CONTINUED) WATER AND WASTE LOANS AND GRANTS Planning, Designing, Bidding, Contracting... including the manner by which it will be effected and the basis for settlement. In addition, such contracts...

  13. 78 FR 48868 - Proposed Cercla Administrative Cost Recovery Settlement; MassDOT, MassDOT Route 1 Right-of-Way...

    Science.gov (United States)

    2013-08-12

    ... Settlement; MassDOT, MassDOT Route 1 Right-of-Way Site, Chelsea, MA AGENCY: Environmental Protection Agency... (``CERCLA''), 42 U.S.C. 9622(h)(1), concerning the MassDOT Route 1 Right-of-Way Site in Chelsea... (OES04-3), Boston, MA 02109-3912 (Telephone No. 617-918-1886) and should refer to: In re: MassDOT Route 1...

  14. An Analysis of Proposed and Current Regulations Concerning Lobbying Costs in Department of Defense Contracts.

    Science.gov (United States)

    1984-06-01

    a reduction in industry participation in the defense mobilization base, and a limiting of capital available for investment in producti- vity...FAR proposals, it appears that this stratgy has b-2n successful to a large degree. Thor,-, ar , how-vr, still areas where critics believe that further...appropriations. Lobbying includes but is not limited to personal discussions or conferences, advertising , sending tel- egrams, engaging in telephonic

  15. Settlement-Size Scaling among Prehistoric Hunter-Gatherer Settlement Systems in the New World.

    Directory of Open Access Journals (Sweden)

    W Randall Haas

    Full Text Available Settlement size predicts extreme variation in the rates and magnitudes of many social and ecological processes in human societies. Yet, the factors that drive human settlement-size variation remain poorly understood. Size variation among economically integrated settlements tends to be heavy tailed such that the smallest settlements are extremely common and the largest settlements extremely large and rare. The upper tail of this size distribution is often formalized mathematically as a power-law function. Explanations for this scaling structure in human settlement systems tend to emphasize complex socioeconomic processes including agriculture, manufacturing, and warfare-behaviors that tend to differentially nucleate and disperse populations hierarchically among settlements. But, the degree to which heavy-tailed settlement-size variation requires such complex behaviors remains unclear. By examining the settlement patterns of eight prehistoric New World hunter-gatherer settlement systems spanning three distinct environmental contexts, this analysis explores the degree to which heavy-tailed settlement-size scaling depends on the aforementioned socioeconomic complexities. Surprisingly, the analysis finds that power-law models offer plausible and parsimonious statistical descriptions of prehistoric hunter-gatherer settlement-size variation. This finding reveals that incipient forms of hierarchical settlement structure may have preceded socioeconomic complexity in human societies and points to a need for additional research to explicate how mobile foragers came to exhibit settlement patterns that are more commonly associated with hierarchical organization. We propose that hunter-gatherer mobility with preferential attachment to previously occupied locations may account for the observed structure in site-size variation.

  16. The Initial Nine Space Settlements

    Science.gov (United States)

    Gale, Anita E.; Edwards, Richard P.

    2003-01-01

    The co-authors describe a chronology of space infrastructure development illustrating how each element of infrastructure enables development of subsequent more ambitious infrastructure. This is likened to the ``Southern California freeway phenomenon'', wherein a new freeway built in a remote area promotes establishment of gas stations, restaurants, hotels, housing, and eventually entire new communities. The chronology includes new launch vehicles, inter-orbit vehicles, multiple LEO space stations, lunar mining, on-orbit manufacturing, tourist destinations, and supporting technologies required to make it all happen. The space settlements encompassed by the chronology are in Earth orbit (L5 and L4), on the lunar surface, in Mars orbit, on the Martian surface, and in the asteroid belt. Each space settlement is justified with a business rationale for construction. This paper is based on materials developed for Space Settlement Design Competitions that enable high school students to experience the technical and management challenges of working on an industry proposal team.

  17. Pre-Launch Tasks Proposed in our Contract of December 1991

    Science.gov (United States)

    1998-01-01

    We propose, during the pre-EOS phase to: (1) develop, with other MODIS Team Members, a means of discriminating different major biome types with NDVI and other AVHRR-based data; (2) develop a simple ecosystem process model for each of these biomes, BIOME-BGC; (3) relate the seasonal trend of weekly composite NDVI to vegetation phenology and temperature limits to develop a satellite defined growing season for vegetation; and (4) define physiologically based energy to mass conversion factors for carbon and water for each biome. Our final core at-launch product will be simplified, completely satellite driven biome specific models for net primary production. We will build these biome specific satellite driven algorithms using a family of simple ecosystem process models as calibration models, collectively called BIOME-BGC, and establish coordination with an existing network of ecological study sites in order to test and validate these products. Field datasets will then be available for both BIOME-BGC development and testing, use for algorithm developments of other MODIS Team Members, and ultimately be our first test point for MODIS land vegetation products upon launch. We will use field sites from the National Science Foundation Long-Term Ecological Research network, and develop Glacier National Park as a major site for intensive validation.

  18. Proposal for the award of three contracts for the provision of temporary labour on the CERN site

    CERN Document Server

    2006-01-01

    This document concerns the award of three contracts for the provision of temporary labour on the CERN site. The Finance Committee is invited to agree to the negotiation of three contracts for the provision of temporary labour on the CERN site with CREYF'S (CH), VEDIOR (CH), and ALPEMPLOI (CH) for a total combined maximum amount for three years for all three contracts of 12 000 000 Swiss francs, not subject to revision, for an initial period of three years from 1 July 2006. The contracts will include options for two further one-year extensions beyond the initial three-year period. 2006/62/5/e

  19. Proposal for the award of a contract, without competitive tendering, for the maintenance of high-voltage switchgear and protection equipment

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract, without competitive tendering, for the maintenance of high-voltage switchgear and protection equipment. The Finance Committee is invited to agree to the negotiation of a contract, without competitive tendering, for the maintenance of high-voltage switchgear and protection equipment with SCHNEIDER (FR) for a total amount of 1 100 000 euros (1 742 000 Swiss francs), covering an initial period of five years, subject to revision for inflation after 1 January 2007. The contract will include options for two one-year extensions beyond the initial five-year period. The amount in Swiss francs has been calculated using the present rate of exchange. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FR - 100%.

  20. 78 FR 47335 - 60-Day Notice of Proposed Information Collection: Public Housing Contracting With Resident-Owned...

    Science.gov (United States)

    2013-08-05

    ... Information Collection: Public Housing Contracting With Resident-Owned Business--Application Requirements... Contracting with Resident- Owned Businesses/Application Requirements. OMB Approval Number: 2577-0161... with State law; Certification that shows the business is owned by residents, disclosure documents that...

  1. 78 FR 65697 - 30-Day Notice of Proposed Information Collection: Public Housing, Contracting With Resident-Owned...

    Science.gov (United States)

    2013-11-01

    ... Information Collection: Public Housing, Contracting With Resident-Owned Businesses--Application Requirements..., Contracting with Resident-Owned Businesses-Application Requirements. OMB Approval Number: 2577-0161. Type of... State law; Certification that shows the business is owned by residents, disclosure documents that...

  2. Managing Contract Training Programs: Progress and Proposals. Institute for Studies in Higher Education Policy Paper No. 2.

    Science.gov (United States)

    Deegan, William L.

    An overview is provided of community college involvement in providing job training for industry on a contract basis. Part 1 provides background on the changing role of community colleges and the introduction of contract training as a means of addressing the growing need of organizations to train and retrain staff. Part 2 offers a national…

  3. An anonymous survey of psychosomatic medicine fellowship directors regarding breaches of contracts and a proposal for prevention.

    Science.gov (United States)

    Levenson, James L; Bialer, Philip

    2010-01-01

    The authors studied how often applicants accept positions at more than one program, or programs offer positions to applicants who have already signed contracts with other programs. An anonymous survey was distributed to all psychosomatic medicine fellowship program directors. It is fairly common for applicants to sign contracts for fellowship positions and then back out of the contracts. Only one program reported ever knowingly offering a contract to an applicant who had accepted a position elsewhere. Programs are divided over whether there are extenuating circumstances under which it would be acceptable to offer a position to an applicant who has already signed a contract with another program. Guidelines for fellowship programs that do not use the National Resident Match Program can improve the recruitment process.

  4. Transport corridors and settlements in a region. Linking settlements to public transport

    Directory of Open Access Journals (Sweden)

    Mojca Šašek Divjak

    2004-01-01

    Full Text Available The focus of the article is conditioning settlement to public transport on the regional and urban level. Similar to occurrences in Western Europe even in Slovenia strong settlement pressures and issues tied to development of suburbanisation are emerging in wider hinterlands of larger cities. In regional centres, where strong transport flows with frequent congestion happen, public transport should be the backbone of the transport system. It is important for consolidation of larger gravitation areas, especially conurbations. We can nevertheless establish that parallel to increasing use of private cars, the use of public transport is decreasing. Thus the present condition demands improvements of transport systems and suitable settlement density in conjunction with development of public transport. This can be achieved only by synergetic linking of public transport development and physical planning in a sustainable settlement system. In the Ljubljana functional region we specifically dealt with links between settlement and the regional public transport system, above all the proposed regional light-railway and tram system in the strict urban area. The decentralised denser settlement model is presented. Based on the study concerning settlement development in the railway corridors we proposed potential possibilities for denser settlement in the immediate areas of suburban railway stations in the northern part of the region, from Črnuče to Kamnik.

  5. 48 CFR 49.109-4 - No-cost settlement.

    Science.gov (United States)

    2010-10-01

    ... incurred costs for the terminated portion of the contract or (b) the contractor is willing to waive the costs incurred and (c) no amounts are due the Government under the contract. ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false No-cost settlement. 49.109...

  6. 48 CFR 227.7009-3 - Additional clauses-contracts except running royalty contracts.

    Science.gov (United States)

    2010-10-01

    ...-contracts except running royalty contracts. 227.7009-3 Section 227.7009-3 Federal Acquisition Regulations...—contracts except running royalty contracts. The following clauses are examples for use in patent release and settlement agreements, and license agreements not providing for payment by the Government of a running...

  7. Proposal to negotiate the renewal of two blanket purchase contracts for the supply of automation systems and fieldbus equipment

    CERN Document Server

    2005-01-01

    This document concerns the renewal of two blanket purchase contracts for the supply of automation systems and fieldbus equipment for the CERN accelerators, technical services and experiments. The Finance Committee is invited to agree to the negotiation of the renewal of two blanket purchase contracts with SCHNEIDER ELECTRIC (FR) and SIEMENS SUISSE (CH) for the supply of automation systems and fieldbus equipment for a period of three years. The total annual amount covering both contracts will not exceed 3 000 000 Swiss francs, subject to revision for inflation.

  8. Proposal for the award of an industrial support contract for operation of the Computer Centre at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for operation of the Computer Centre at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the consortium DATA CONVERSION SYSTEMS (CH) - INTRACOM BULGARIA (BG), the lowest bidder, for the operation of the Computer Centre at CERN for a period of three years for a total amount not exceeding 2 046 570 Swiss francs, not subject to revision for the first two years. The contract will include options for two one-year extensions beyond the initial three-year period. 2006/55/5/e

  9. Proposal for the award of an industrial support contract for paintwork, false ceilings, plasterwork and false floors at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for paintwork, false ceilings, plasterwork and false floors at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the firm PREZIOSO (FR), the lowest bidder, for the provision of paintwork, false ceilings, plasterwork and false floors at CERN for a period of three years for a total amount not exceeding 538 419 euros (830 381 Swiss francs), not subject to revision for the first two years. The contract will include options for two one-year extensions beyond the initial threeyear period.

  10. Proposal for the award of an industrial support contract for minor civil-engineering work at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for minor civil-engineering work at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the firm LOSINGER CONSTRUCTION (CH), the lowest bidder, for the provision of minor civilengineering work at CERN for three years for a total amount not exceeding 2 840 278 Swiss francs, not subject to revision for the first two years. The contract will include options for two one-year extensions beyond the initial three-year period.

  11. Proposal for the award of an industrial support contract for minor metalwork, metal fittings, cladding and roofing at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for minor metalwork, metal fittings, cladding and roofing at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the firm INIZIATIVE INDUSTRIALI SRL (IT), the lowest bidder, for the provision of minor metalwork, metal fittings, cladding and roofing at CERN for three years for a total amount not exceeding 1 467 895 euros (2 258 301 Swiss francs), not subject to revision for two years. The contract will include options for two one-year extensions beyond the initial three-year period.

  12. Proposal for the award of a contract for the supply of connection boxes for electrical racks for the LHC magnets

    CERN Document Server

    2004-01-01

    This document concerns the award of a contract for the supply of 1670 connection boxes for two different types of electrical racks for the LHC magnets. The Finance Committee is invited to agree to the negotiation of an ex-works contract with CRAWFORD, HANSFORD & KIMBER (GB), for the supply of 1670 connection boxes for a total amount of 473 774 pounds sterling (1 080 442 Swiss francs), not subject to revision. The rate of exchange used is that stipulated in the tender.

  13. 23 CFR 635.125 - Termination of contract.

    Science.gov (United States)

    2010-04-01

    ... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.125 Termination of contract. (a) All contracts exceeding... 23 Highways 1 2010-04-01 2010-04-01 false Termination of contract. 635.125 Section 635.125... the termination will be effected and the basis for settlement. In addition, such contracts shall...

  14. Proposal to negotiate an amendment to an existing contract for the supply of the cold masses of the LHC short straight sections

    CERN Document Server

    2006-01-01

    This document concerns the proposal to negotiate an amendment to an existing contract for the supply of the main superconducting quadrupoles and assembly of the cold masses of the LHC short straight sections. For the reasons explained in this document, the Finance Committee is invited to approve an amendment to an existing contract with the firm ACCEL INSTRUMENTS (DE) for an amount of 1 513 618 euros (2 411 496 Swiss francs), bringing the total to a maximum amount of 40 815 743 euros (65 027 641 Swiss francs), subject to revision for inflation. The amount in Swiss francs has been calculated using the present rate of exchange.

  15. Proposal to negotiate an amendment to an exisiting contract for the supply of additional Multi-layer Insulation (MLI) blankets for the LHC

    CERN Document Server

    2006-01-01

    This document concerns the proposal to negotiate an amendment to an existing contract for the supply of additional sets of MLI blankets. For the reasons explained in this document, the Finance Committee is invited to approve an amendment to an existing contract with JEHIER (FR) for the supply of additional MLI blanket sets for an amount of 1 020 000 euros (1 625 000 Swiss francs), bringing the total to a maximum amount of 8 954 359 euros (14 266 084 Swiss francs), subject to revision for inflation. The amounts in Swiss francs have been calculated using the present rate of exchange.

  16. Proposal to negotiate an amendment to an existing contract for the supply of additional Multi-Layer Insulation (MLI) blankets for the LHC

    CERN Document Server

    2005-01-01

    This document concerns the proposal to negotiate an amendment to an existing contract for the supply of additional sets of MLI blankets. For the reasons explained in this document, the Finance Committee is invited to approve an amendment to an existing contract with JEHIER (FR) for the supply of an additional 2 420 MLI blankets for an amount of 1 863 400 euros (2 909 513 Swiss francs), subject to revision for inflation, bringing the total to a maximum amount of 7 934 359 euros (12 388 708 Swiss francs), subject to revision for inflation. The amounts in Swiss francs have been calculated using the present rate of exchange.

  17. Proposal to negotiate an amendment to an existing blanket purchase contract for the supply of Burndy connectors for the LHC project and LHC experiments

    CERN Document Server

    2006-01-01

    This document concerns the proposal to negotiate an amendment to an existing blanket purchase contract for the supply of Burndy connectors for the LHC project and LHC experiments. For the reasons explained in this document, the Finance Committee is invited to agree to the negotiation of an amendment to the blanket purchase contract for the supply of Burndy connectors for the LHC project and LHC experiments with the company SOURIAU (CH), for the next three years for up to 600 000 euros (954 600 Swiss francs), subject to revision for inflation from January 2007, bringing the total amount of the blanket purchase contract to a maximum amount of 1 200 000 euros (1 909 200 Swiss francs), subject to revision for inflation from January 2007. The amounts in Swiss francs have been calculated using the present rate of exchange. 2006/60/5/e

  18. Proposal for the award of a contract, without competitive tendering, for the supply of two cabling machines for the manufacture of superconducting cable for the LHC main magnets

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract, without competitive tendering, for the supply of two cabling machines for the production of superconducting cable for the LHC main magnets. These cables are of two different types, hereafter referred as Cable 1 and Cable 2. For the reasons set out in this document, the Finance Committee is invited to agree to the negotiation of a contract with SETIC (FR) for the supply of two cabling machines, for a total amount not exceeding 3 200 000 euros (4 948 800 Swiss francs), not subject to revision. The rate of exchange which has been used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FR - 100%.

  19. Proposal for the award of a contract without competitive tendering for the supply of coaxial high-voltage cable for the LHC beam dumping system

    CERN Document Server

    2002-01-01

    This document concerns the award of a contract without competitive tendering for the supply of two types of coaxial high-voltage cable for the LHC beam dumping system. Following a market survey carried out among 14 firms in four Member States, a call for tenders (IT-2969/SL/LHC) was sent on 10 July 2001 to one firm. By the closing date, CERN had received one tender. The Finance Committee is invited to agree to the negotiation of a contract with DRAKA MULTIMEDIA CABLE (DE), the only bidder, for the supply of 14 km of coaxial high-voltage cable for the LHC beam dumping system for a total amount of 530 488 euros (779 900 Swiss francs), not subject to revision. The rate of exchange which has been used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: DE - 100%.

  20. Investigations into the Settlement and Attachment of Biofouling Marine Invertebrates

    Science.gov (United States)

    2015-12-17

    attachment of biofouling marine invertebrates 5a. CONTRACT NUMBER N00014-12-1 -0432 5b. GRANT NUMBER n/a 5c. PROGRAM ELEMENT NUMBER n/a 6...larval settlement in a variety of marine invertebrate species, including B. neritina. Light also inhibits B. neritina larval settlement, yet the...underlying mechanisms by which light and adrenergic compounds exert their effects on larvae are largely unknown. Octopamine is considered the invertebrate

  1. Proposal for the award of a contract for cleaning on the Swiss part of the CERN site

    CERN Document Server

    2005-01-01

    This document concerns the award of a contract for cleaning on the Swiss part of the CERN site. The Finance Committee is invited to agree to the negotiation of a contract with TOP-NET SERVICES (CH), the lowest bidder complying with the specification, for the provision of cleaning and building maintenance work on the Swiss part of the CERN site for three years for a total amount of 5 841 159 Swiss francs, not subject to revision until 1 January 2009, with options for additional services for an additional amount of 350 000 Swiss francs, not subject to revision until 1 January 2009, bringing the total amount to 6 191 159 Swiss francs, not subject to revision until 1 January 2009. The contract will include options for two one-year extensions beyond the initial three-year period.

  2. Proposal for the award of an industrial support contract for the handling of the organization?s mail

    CERN Document Server

    1999-01-01

    This document concerns the award of an Industrial Support contract for the handling of the Organization?s mail. Following a market survey carried out among 37 firms in nine Member States, a call for tenders (IT-2402/AS/Revised) was sent on 10 August 1999 to three firms and three consortia, in five Member States. By the closing date, CERN had received five tenders from firms and consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium ISS GEBÄUDESERVICE (DE) - ISS SERVISYSTEM (CH), the lowest bidder, for an initial period of three years starting on 1st April 2000, for a total amount of 2 050 000 Swiss francs, not subject to revision until 31 March 2001. The contract will include options for two one-year extensions beyond the initial three-year period.

  3. Proposal to negotiate an amendment to the existing contract for the assembly of cryomagnets for the LHC

    CERN Document Server

    2005-01-01

    For the reasons explained in this document, the Finance Committee is invited to approve an amendment to the existing contract with the consortium INTERTEC (DK), CEGELEC (FR) and AMEC SPIE (FR) for the assembly of the LHC cryomagnets for an amount not exceeding 6 586 741 euros (10 284 537 Swiss francs), subject to revision for inflation, bringing the total amount of the contract to an amount of 24 690 595 euros (38 551 895 Swiss francs). The amounts in Swiss francs have been calculated using the present rate of exchange.

  4. Transparency of standard terms under the Unfair Contract Terms Directive and the Proposal for a Common European Sales Law

    NARCIS (Netherlands)

    Loos, M.B.M.

    2015-01-01

    This paper discusses whether and to what extent the transparency principle is applicable to standard contract terms legislation under European Union law and what the consequences are when the principle, in so far as it is recognized, is breached. To that extent, it focuses first on the Unfair

  5. Mandatory Contract Law: Functions and Principles in Light of the Proposal for a Directive on Consumer Rights

    NARCIS (Netherlands)

    G. Wagner (Gerhard)

    2010-01-01

    textabstractStarting from the theoretical underpinnings of contract law, mandatory rules should be the exception. In the reality of current European legislation, mandatory law is not the exception but the rule. The obvious explanation is that the EU has focussed on consumer law, i.e. on the

  6. Proposal for the award of an industrial services contract for the operation and maintenance of liquid helium cryogenic plants

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Services contract for the operation and maintenance of liquid helium cryogenic plants. Following a market survey carried out among 54 firms in twelve Member States, a call for tenders (IT-2719/LHC) was sent on 18 August 2000 to two firms and four consortia, two consisting of two firms and two consisting of three firms, in five Member States. By the closing date, CERN had received tenders from one firm and three consortia, in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium AIR LIQUIDE (FR) - LINDE KRYOTECHNIK (CH) - SERCO (DE), the lowest bidder, for an initial period of four years from 17 July 2001 for a total amount of 19 804 400 Swiss francs, not subject to revision until 16 July 2005. The contract will include options for two one-year extensions beyond the initial four-year period. The consortium has indicated the following distribution by country of the contract value covered by this adjudi...

  7. Proposal for the award of an industrial services contract for civil engineering superstructure and internal construction building work

    CERN Document Server

    2001-01-01

    This document concerns the award of an Industrial Services contract for civil engineering superstructure and internal construction building work. Following a market survey carried out among 112 firms in fifteen Member States, a call for tenders (IT-2546/ST/Rev.) was sent on 12 April 2001 to eleven consortia, four consisting of four firms, three consisting of three firms and four consisting of two firms, in seven Member States. By the closing date, CERN had received tenders from eight consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium SPIE CITRA SUD-EST(FR)-ANTIRUST TECHNOLOGY (GR), the lowest bidder, for an initial period of three years from 1 January 2002 for an amount not exceeding 15 375 000 Swiss francs, not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium has indicated the following distribution by country of the contract value covered by this ...

  8. Proposal for the award of a contract for provision of mechanical design and draughting services off the CERN site

    CERN Document Server

    2004-01-01

    This document concerns the award of a contract for the provision of mechanical design and draughting services off the CERN site. Following a market survey carried out among 62 firms in fifteen Member States, a call for tenders (IT-3213/EST) was sent on 19 January 2004 to eight firms, in seven Member States. By the closing date, CERN had received eight tenders from eight firms in seven Member States. The Finance Committee is invited to agree to the negotiation of a contract with ACROTECNA (FR), the lowest bidder, for the provision of mechanical design and draughting services off the CERN site for an amount of 489 373 euros (771 882 Swiss francs) for an initial period of three years starting on 1 July 2004, subject to revision for inflation from 1 July 2007. The rate of exchange used is that stipulated in the tender. The contract will include options for two one-year extensions beyond the initial three-year period. The firm has indicated the following distribution by country of the contract value covered by thi...

  9. 76 FR 22143 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-04-20

    ..., and any other applicable water-related contracts. 7. Identify the organizational structure planned for... Fryingpan-Arkansas Project (Fry-Ark Project), Colorado AGENCY: Bureau of Reclamation, Interior. ACTION... at Pueblo Dam River Outlet of the Fry-Ark Project, Colorado. Reclamation is considering such...

  10. NAAG Tobacco Settlement Payments

    Data.gov (United States)

    U.S. Department of Health & Human Services — 1999-2016. National Association of Attorneys General (NAAG). Policy—Tobacco Settlement Payments. The National Association of Attorneys General (NAAG) provides...

  11. NAAG Tobacco Settlement Payments

    Data.gov (United States)

    U.S. Department of Health & Human Services — 1999-2017. National Association of Attorneys General (NAAG). Policy—Tobacco Settlement Payments. The National Association of Attorneys General (NAAG) provides...

  12. Minnesota Power Settlement

    Science.gov (United States)

    EPA and DOJ announced a Clean Air Act settlement with Minnesota Power, an ALLETE company based in Duluth, that will cover its three coal-fired power plants and one biomass-and-coal-fired steam and electricity cogeneration plan

  13. The Researches on Cycle-Changeable Generation Settlement Method

    Science.gov (United States)

    XU, Jun; LONG, Suyan; LV, Jianhu

    2018-03-01

    Through the analysis of the business characteristics and problems of price adjustment, a cycle-changeable generation settlement method is proposed to support any time cycle settlement, and put forward a complete set of solutions, including the creation of settlement tasks, time power dismantle, generating fixed cycle of electricity, net energy split. At the same time, the overall design flow of cycle-changeable settlement is given. This method supports multiple price adjustments during the month, and also is an effective solution to the cost reduction of month-after price adjustment.

  14. Proposal for the award of a contract for the construction of an on-site hostel at CERN

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for the construction of an on-site hostel at CERN. The Finance Committee is invited to agree to the negotiation of a contract with the consortium BATIFLEX (GB) - BATINEG (CH), the lowest bidder, for the construction of an on-site hostel at CERN for a total amount of 5 290 000 Swiss francs, not subject to revision. However, for the reasons explained in this document, the Management wishes to request the Finance Committee to give consideration to the approval of a variant to the original specification to allow use to be made of part of an existing building for the reasons detailed in this document, at an additional cost of 350 000 Swiss francs, not subject to revision, bringing the total construction cost to 5 640 000 Swiss francs.

  15. Proposal for the award of a contract for the supply, installation, commissioning and maintenance of the LHC access safety system

    CERN Document Server

    2005-01-01

    This document concerns the award of a contract for the supply, installation, commissioning and maintenance of the LHC access safety system. The Finance Committee is invited to agree to the negotiation of a contract with the consortium CEGELEC CENTRE EST (FR) â?" CEGELEC (NL) â?" SEMER (FR), the lowest bidder, for the supply, installation, commissioning and maintenance for five years of the LHC access safety system for a total amount of 891 423 euros (1 367 633 Swiss francs), subject to revision for inflation for the maintenance of the system from 1 January 2007, with an option for the supply of safety PLCs for a total amount of 894 951 euros (1 373 046 Swiss francs), not subject to revision, bringing the total amount to 1 786 374 euros (2 740 679 CHF).The rate of exchange used is that stipulated in the tender.

  16. Proposal for the award of a contract for the supply of TCP and TCS collimators for the LHC

    CERN Document Server

    2004-01-01

    This document concerns the award of a contract for the supply of 40 TCP and TCS collimators for the LHC cleaning insertions. The Finance Committee is invited to agree to the negotiation of a contract with CERCA (FR), the lowest bidder, for the supply of 40 collimators for a total amount of 1 122 173 euros (1 718 720 Swiss francs), not subject to revision, with options for up to 11 collimators for an amount of up to 279 280 euros (427 745 Swiss francs), subject to revision for inflation from 1 January 2007, bringing the total amount to 1 401 453 euros (2 146 465 Swiss francs), subject to revision for inflation from 1 January 2007. The rate of exchange used is that stipulated in the tender.

  17. Proposal to negotiate an amendment to an existing blanket purchase contract for the supply and repair of subracks for the LHC experiments

    CERN Document Server

    2006-01-01

    This document concerns the proposal to negotiate an amendment to an existing blanket purchase contract for the supply and repair of subracks for the LHC experiments. For the reasons explained in this document, the Finance Committee is invited to agree to the negotiation of an amendment to the blanket purchase contract for the supply and repair of subracks for the LHC experiments with the company WIENER, PLEIN & BAUS (DE), for an extension of the period of supply from four to six years for an amount exceeding the previously authorised amount of 5 600 000 euros, subject to revision for inflation from January 2003, by up to 1 880 000 euros, subject to revision for inflation, bringing the total amount of the blanket purchase contract to a maximum amount of 7 480 000 euros, subject to revision for inflation. At the present rate of exchange, the total amended amount of the blanket purchase contract is equivalent to approximately 11 800 000 Swiss francs. CERN's total financial contribution to the funding of the ...

  18. Proposal for the renegotiation of a contract for the supply of eight coil casings for the barrel toroid magnet of the ATLAS detector

    CERN Document Server

    2001-01-01

    This document concerns the renegotiation of a contract for the supply of eight coil casings for the Barrel Toroid Magnet of the ATLAS detector. The proposal for the award of a contract with ABB ENERTECH (CH) was presented to Finance Committee for information in September 1998 (CERN/FC/4089). In view of the developments outlined in this document, the Finance Committee is invited to agree to the renegotiation of a contract with ALSTOM SWITZERLAND (CH), for the supply of eight coil casings for the ATLAS Barrel Toroid Magnet for a total Ex-works price of 12 580 000 Swiss francs, subject to revision after 31 July 2001, with an option for an extra coil casing for an additional Ex-works price of 1 525 000 Swiss francs, subject to revision after 31 July 2001, bringing the total amount for the supply to 14 105 000 Swiss francs, subject to revision after 31 July 2001. The total amount of the contract, including transport to the integration site, will not exceed 14 490 000 Swiss francs, subject to revision after 31 July...

  19. Proposal for the award of two contracts for the maintenance of green areas and roads on the CERN site

    CERN Document Server

    2006-01-01

    This document concerns the award of two contracts for the maintenance of green areas and roads, i) on the CERN site of Meyrin, LHC Point 1 and SPS Points BA5 and BA6 and ii) on the CERN site of Prévessin, all the LHC Points except Point 1 and all the SPS Points except Points BA5 and BA6. The Finance Committee is invited to agree to the negotiation of contracts with: - PAYSAGE CONCEPT (FR), the lowest bidder, for the maintenance of green areas and roads on the CERN's Meyrin site, LHC Point 1 and SPS Points BA5 and BA6 for two years for a total amount of 903 532 Swiss francs, not subject to revision until 30 June 2008. - WIESMANN (FR), the lowest bidder, for the maintenance of green areas and roads on the CERN's Prévessin site, all the LHC Points except Point 1 and all the SPS Points except Points BA5 and BA6 for two years for a total amount of 671 529 Swiss francs, not subject to revision until 30 June 2008. Both contracts will include options for three one-year extensions beyond the initial two-year period....

  20. Proposal for the award of two contracts for the provision of high-speed data circuits to the USA

    CERN Document Server

    2005-01-01

    This document concerns the award of two contracts for high-speed (10 Gbit/s) data circuits for Wide Area Network (WAN) connectivity between CERN and the STARLIGHT Internet exchange in Chicago through the MANLAN Internet exchange in New York, USA, on behalf of a consortium comprising CERN, the US Department of Energy, the World Health Organisation and the Centre de Resources Informatiques de la Haute-Savoie (France). The Finance Committee is invited to agree to the negotiation of two contracts, together covering the provision of up to four high-speed (10 Gbit/s) data circuits to the USA, with: GLOBAL CROSSING (CH) for one 10 Gbit/s circuit between CERN and New York, two 10 Gbit/s circuits between New York and Chicago and Internet access points in Geneva and New York, for a period of three years for a total amount of 2 764 517 Swiss francs, not subject to revision. The contract will include options for one additional 10 Gbit/s circuit between CERN and New York and two additional 10 Gbit/s circuits between New Y...

  1. Proposal for the award of a contract for the provision of a high-speed data circuit to the USA

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for a high-speed data circuit for Wide Area Network (WAN) connectivity between CERN and the STARLIGHT Internet exchange in Chicago, USA. The contract will be negotiated on behalf of CERN and its partners, CNRS/IN2P3 (FR), the US Department of Energy (DoE) through the California Institute of Technology (Caltech), the US National Science Foundation (NSF), the Canadian high-energy physics community through Carleton University and the World Health Organisation in Geneva. Following a market survey carried out among 26 firms in nine Member States and three firms in the USA, a call for tenders (IT-2983/IT) was sent on 7 September 2001 to 17 firms in eight Member States. By the closing date, CERN had received 13 tenders from eight Member States. The Finance Committee is invited to agree to the negotiation, on behalf of CERN and its partners, of a contract for the provision of a high-speed data circuit to the USA, with KPNQWEST (NL), the lowest bidder (after realignment),...

  2. Proposal for the award of a contract for the supply of analogue optoelectronic receiver modules for the CMS tracker

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply of 12-channel analogue optoelectronic receiver modules for the CMS Tracker. Following a market survey carried out among 56 firms in seventeen Member States and four firms in two non-Member States, a call for tenders (IT-2810/EP/CMS) was sent on 29 June 2001 to one firm in a Member State and one firm in a non-Member State. By the closing date, CERN had received one tender. The Finance Committee is invited to agree to the negotiation of a contract with NGK INSULATORS (JP), the only bidder, for the supply of 4500 units of 12-channel analogue optoelectronic receiver modules for a total amount of 228 485 949 Japanese yen, not subject to revision until 31 December 2003. At the rate of exchange stipulated in the tender, this amount is equivalent to approximately 3 110 500 Swiss francs. CERN's contribution to the total cost is 1 863 967 Swiss francs. The firm has indicated the following distribution by country of the contract value covered by this adjudica...

  3. Proposal for the award of a contract to measure the geometry of the LHC cryo-magnets

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract to measure the geometry of the LHC cryo-magnets. Following a market survey carried out among 43 firms in eleven Member States, a call for tenders (IT-2989/EST/LHC) was sent on 10 March 2003 to one firm and three consortia, in seven Member States. By the closing date, CERN had received three tenders from the three consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium SETAT (FR), INTROTECH (NL) and MAP (CH), the lowest bidder, to measure the geometry of the LHC cryo-magnets, for an amount not exceeding 2 097 582 euros (3 173 347 Swiss francs) covering an initial period of three years starting on 1 October 2003, subject to revision for inflation from 1 October 2004. The rate of exchange used is that stipulated in the tender. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium has indicated the following distribution by country of th...

  4. Proposal for the Award of a Contract for the Supply of the Power Units for LHC Thyristor Power Converters

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the supply of 12 power units of thyristor power converters rated from 365 to 770 kW for the LHC. Following a market survey carried out among 98 firms in nineteen Member States, a call for tenders (IT-3003/SL/LHC) was sent on 25 October 2002 to six firms in four Member States. By the closing date, CERN had received five tenders from five firms in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with OCEM (IT), the lowest bidder, for the supply of 12 power units of thyristor power converters for a total amount of 981 484 Swiss francs not subject to revision, with options for three additional units of the power part of thyristor power converters, for an additional amount of 249 681 Swiss francs, subject to revision for inflation from 1 August 2006, bringing the total amount to 1 231 165 Swiss francs. The firm has indicated the following distribution by country of the contract value covered by this adjudication propos...

  5. Proposal to negotiate an amendment to an existing contract for the supply and installation of interconnecting pipework for cryogenics and cooling of the LHC

    CERN Document Server

    2003-01-01

    This document concerns the proposal to negotiate an amendment to an existing contract for the supply and installation of interconnecting pipework for cryogenics and cooling of the LHC. For the reasons explained in this document, the Finance Committee is invited to approve an amendment to the existing contract for the supply and installation of interconnecting pipework for cryogenics and cooling of the LHC with the firm DEMONT (IT) for an amount exceeding the previously approved amount of 3 818 877 euros (5 881 000 Swiss francs) by up to 2 157 800 euros (3 323 000 Swiss francs), subject to revision for inflation, bringing the total contract amount to a maximum amount of 5 976 677 euros (9 204 000 Swiss francs), subject to revision for inflation. The rate of exchange used is that stipulated in the initial tender (CERN/FC/4322). The firm has declared the following origin of the equipment covered by this adjudication proposal: IT - 85%, CZ - 5%, SK - 4%, FR - 3%, PL - 3%.

  6. Proposal to negotiate amendments to an existing contract for the supply of steel structures for the LHC shafts, tunnels, caverns and experimental areas

    CERN Document Server

    2005-01-01

    This document concerns the proposal to negotiate amendments to an existing contract for the supply of additional steel structures for the LHC shafts, tunnels, caverns and experimental areas. For the reasons explained in this document, the Finance Committee is invited to approve amendments to the existing contract with the firm INIZIATIVE INDUSTRIALI (IT) for the supply of additional steel structures for the LHC shafts, tunnels, caverns and experimental areas for an amount of 500 000 euros (775 000 Swiss francs), subject to revision for inflation, bringing the total to 6 525 745 euros (10 114 905 Swiss francs), subject to revision for inflation. The amounts in Swiss francs have been calculated using the present rate of exchange.

  7. Proposal to negotiate an amendment to an existing contract for the supply of MQY-type superconducting quadrupole magnets for the LHC insertions

    CERN Document Server

    2005-01-01

    This document concerns the proposal to negotiate an amendment to an existing contract for the supply of MQY-type superconducting quadrupole magnets for the LHC insertions. For the reasons explained in this document, the Finance Committee is invited to approve an amendment to an existing contract with the firm ACCEL (DE) for the supply of four additional MQY-type superconducting quadrupole magnets for an amount of 569 000 euros (881 950 Swiss francs), subject to revision for inflation, bringing the total to a maximum amount of up to 3 198 656 euros (4 957 917 Swiss francs), subject to revision for inflation. The amounts in Swiss francs have been calculated using the present rate of exchange.

  8. Proposal to negotiate an amendment to an existing contract for the supply of additional vacuum vessels for the short-straight sections of the LHC

    CERN Document Server

    2005-01-01

    This document concerns the proposal to negotiate an amendment to an existing contract for the supply of additional vacuum vessels for the short-straight sections of the LHC. For the reasons explained in this document, the Finance Committee is invited to approve an amendment to an existing contract with SLOVENSKE ENERGETICKE STROJARNE (SK) for the supply of 25 additional vacuum vessels for the short-straight sections for the LHC for an amount of 140 000 euros (216 999 Swiss francs), subject to revision for inflation, bringing the total to a maximum amount of 6 176 855 euros (9 574 097 Swiss francs), subject to revision for inflation. The rate of exchange used is that stipulated in the tender.

  9. Proposal for the award of a contract for provision of on-site welding inspections for the LHC

    CERN Document Server

    European Organization for Nuclear Research

    2004-01-01

    This document concerns the award of a contract for the provision of on-site welding inspections for the LHC magnets and their interconnections. Following a market survey MS-3207/TIS carried out among 82 firms in twelve Member States, a call for tenders (IT-3276/AT/LHC) was sent on 27 January 2004 to twelve firms, in seven Member States. By the closing date, CERN had received five tenders from four firms and one consortium in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with IS SERVICES (FR), the lowest bidder for the provision of on-site welding inspections for the LHC for a total amount not exceeding 710 197 euros (1 121 543 Swiss francs) covering a period of three years starting on 1 July 2004 with an option for additional work for an amount of 89 677 euros (141 619 Swiss francs) bringing the total amount to 799 874 euros (1 263 162 Swiss francs) not subject to revision. The rate of exchange used is that stipulated in the tender. The firm has indicated the ...

  10. Proposal for the award of a contract for the supply of ceramic vacuum chambers for the LHC beam dumping system

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply of ceramic vacuum chambers for the LHC beam dumping system. Following a market survey carried out among 22 firms in seven Member States and one firm in the United States, a call for tenders (IT-2765/SL/LHC) was sent on 13 September 2001 to one firm. By the closing date, CERN had received a tender. The Finance Committee is invited to agree to the negotiation of a contract with KYOCERA FINECERAMICS (DE) for the supply of 36 ceramic vacuum chambers for the LHC beam dumping system for a total amount of 681 530 euros (1 013 094 Swiss francs), not subject to revision, with options for six additional vacuum chambers, for an additional amount of 146 768 euros (218 171 Swiss francs), not subject to revision, bringing the total amount to 828 298 euros (1 231 265 Swiss francs), not subject to revision. The rate of exchange which has been used is that applying on the closing date of the call for tenders. The firm has indicated the following distribution by cou...

  11. Proposal for the award of a contract for the supply of LHC dipole thermal shield bottom tray assemblies

    CERN Document Server

    2000-01-01

    This document concerns the award of a contract for the supply of 1 250 LHC dipole thermal shield bottom tray assemblies. Following a market survey carried out among 95 firms in sixteen Member States, a call for tenders (IT-2650/LHC/LHC) was sent on 8 November 1999 to eight firms in six Member States. By the closing date, CERN had received four tenders. The Finance Committee is invited to agree to the negotiation of a contract with the firm EISENWERKE KAISERSLAUTERN (DE), the lowest bidder, for the supply of 1 250 LHC dipole thermal shield bottom tray assemblies for a total amount of 6 150 808 euros (9 858 518 Swiss francs), subject to revision for contractual deliveries after 31 December 2001, with an option for the supply of up to 150 additional thermal shield bottom tray assemblies, for a total amount of 696 979 euros (1 117 118 Swiss francs), subject to revision for contractual deliveries after 31 December 2001, bringing the total amount to a maximum of 6 847 787 euros (10 975 636 Swiss francs), subject to...

  12. Proposal for the Award of Two Contracts for the Supply of High Temperature SuperconductingTape for the LHC

    CERN Document Server

    2003-01-01

    This document concerns the award of two contracts for the supply of high temperature superconducting (HTS) BSCCO 2223 Ag-Au tape, of two different types, for the LHC. Following a call for tenders (IT-3143/AT/LHC) sent on 5 March 2003 to four firms in two Member States and one firm in the US, CERN received one tender from a firm in a Member State and one tender from the firm in the United States. The Finance Committee is invited to agree to the negotiation of contracts with: - VACUUMSCHMELZE (DE), for the supply of 17 km of HTS BSCCO 2223 Ag-Au tape with Ic > 66 A at 77 K for a total amount of 807 833 euros (1 201 900 Swiss francs), not subject to revision, with an option for the supply of up to additional 17 km of HTS BSCCO 2223 Ag-Au tape, for a total amount of up to 807 833 euros (1 201 900 Swiss francs), not subject to revision, bringing the total amount to a maximum of 1 615 666 euros (2 403 800 Swiss francs), not subject to revision. The rate of exchange used is that stipulated in the tender.

  13. Proposal for the award of two contracts for the supply of bellows expansion joints for LHC cryomagnet interconnections

    CERN Document Server

    2000-01-01

    This document concerns the award of two contracts for the supply of bellows expansion joints for LHC cryomagnet interconnections. Following a market survey carried out among 39 firms in eight Member States, a call for tenders (IT-2630/LHC/LHC) was sent on 31 May 2000 to 14 firms in five Member States. By the closing date, CERN had received tenders from five firms in four Member States. The Finance Committee is invited to agree to the negotiation of: - a contract with HANS SKODOCK (DE), the lowest bidder, for the supply of two packages of bellows expansion joints, namely the U-type package and the nested bellows package for a total amount of 2 796 785 euros (4 353 650 Swiss francs), not subject to revision, with options for 20% extra bellows expansion joints for an additional amount of 559 357 euros (870 730 Swiss francs), not subject to revision, bringing the total amount to 3 356 142 euros (5 224 380 Swiss francs), not subject to revision. The rates of exchange which have been used are those stipulated in th...

  14. Proposal for the award of a contract for the supply and installation of a pumping unit for gaseous helium

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply and installation of a pumping unit for gaseous helium. Following a market survey carried out among 17 firms in seven Member States, a call for tenders (IT-2930/LHC/LHC) was sent on 26 April 2001 to four firms in four Member States. By the closing date, CERN had received tenders from all firms. The Finance Committee is invited to agree to the negotiation of a contract with LEYBOLD (CH), the lowest bidder, for the supply and installation of a pumping unit for gaseous helium for a total amount of 716 600 euros (1 099 264 Swiss francs), not subject to revision, with an option for one additional pumping unit, for an additional amount of 704 000 euros (1 079 936 Swiss francs), not subject to revision, bringing the total amount to 1 420 600 euros (2 179 200 Swiss francs), not subject to revision. The above amounts in Swiss francs have been calculated using the rate of exchange applicable at the closing date of the call for tenders. The firm has indicated ...

  15. PROPOSAL OF THE SOCIAL CONTRACT IN MANAGEMENT AS INSTRUMENT OF ANALYSIS FOR THE EMPLOYMENT RELATION. THE EXPERIENCE OF AUTOMOTIVE INDUSTRY IN ROMANIA

    Directory of Open Access Journals (Sweden)

    Muresanu Doina

    2012-07-01

    Full Text Available The communication presents the partial results of a research proposing the social contract as a new instrument of analysis for the employment relation in a social context in change, such as the case of Rumania. Until then, the research which aimed at the employment relation which is formed between the employer and the employees widely appealed to the concept of psychological contract (Rousseau, 1989; 1995. The psychological contract, defined as the perception of the mutual obligations assumed by the employee and by the employer, benefited from a fashion effect in the 1990s, when the economic difficulties questioned the model of classic employment relation based on loyalty. However, most of the empirical works on the psychological contract are static studies, for the greater part elaborated by questionnaire, which do not allow to define the impact of the social context change on the evolution of the employment relation. Although certain studies are interested in a context of change (Dick, 2010, most of the past works describe the contents and the evaluation of the psychological contract in an unchanging social environment. Yet, we saw it in the case of the ex-communist countries or those of the Northern Africa, the change in the environment of the employment relation is more present than ever. Our communication proposes a research frame which would be more suited to the understanding of the employment relation in a society in change. To do it, we rely on the social contract in management, which we define as the ensemble of the norms and of the tacit laws existing in a society or a group given with regard to the relation of employment. The approach by the social contract presents the advantage of including multiple elements bound to a societal context, such as the laws, the national culture, the faiths shared by the business environment, etc. (Rousseau, 1995. It offers a new frame of analysis for the employment relation by suggesting that it is

  16. Model for mapping settlements

    Science.gov (United States)

    Vatsavai, Ranga Raju; Graesser, Jordan B.; Bhaduri, Budhendra L.

    2016-07-05

    A programmable media includes a graphical processing unit in communication with a memory element. The graphical processing unit is configured to detect one or more settlement regions from a high resolution remote sensed image based on the execution of programming code. The graphical processing unit identifies one or more settlements through the execution of the programming code that executes a multi-instance learning algorithm that models portions of the high resolution remote sensed image. The identification is based on spectral bands transmitted by a satellite and on selected designations of the image patches.

  17. Settlement patterns and sustainability

    DEFF Research Database (Denmark)

    Hendriksen, Kåre

    This paper discusses settlement patterns and sustainability. Generally urbanization is recognised as an inevitable development driven by job opportunities, better service supply, education, and health services, and it is argued that this is the main driver for centralisation. Research based...... on economic and demographic studies and a large series of interviews problematize this. In Greenland the historical correlation between settlement pattern and livelihood has been decoupled, so that distributions of jobs and potential earnings to a growing extend is a consequence of political and...

  18. Settlement Prediction of Footings Using VS

    Directory of Open Access Journals (Sweden)

    Hyung Ik CHO

    2017-10-01

    Full Text Available The shear wave velocity (VS is a key parameter for estimating the deformation characteristics of soil. In order to predict the settlement of shallow footings in granular soil, the VS and the concept of Schmertmann’s framework were adopted. The VS was utilized to represent soil stiffness instead of cone tip resistance (qc because the VS can be directly related to the small-strain shear modulus. By combining the VS measured in the field and the modulus reduction curve measured in the laboratory, the deformation characteristics of soil can be reliably estimated. Vertical stress increments were determined using two different profiles of the strain influence factor (Iz proposed in Schmertmann’s method and that calculated from the theory of elasticity. The corresponding modulus variation was determined by considering the stress level and strain at each depth. This state-dependent stress-strain relationship was utilized to calculate the settlement of footings based on the theory of elasticity. To verify the developed method, geotechnical centrifuge tests were carried out. The VS profiles were measured before each loading test, and the load-settlement curves were obtained during the tests. Comparisons between the measured and estimated load-settlement curves showed that the developed method adequately predicts the settlement of footings, especially for over-consolidated ground conditions.

  19. Proposal for the award of a contract for the supply and installation of prefabricated reinforced-concrete modules for an LHC access shaft

    CERN Document Server

    2000-01-01

    This document concerns the award of a contract for the supply and installation of 33 prefabricated reinforced-concrete modules for the PX15 access shaft. Following a market survey carried out among 39 firms in fourteen Member States, a call for tenders (IT-2714/ST/LHC) was sent on 22 May 2000 to seven firms and one consortium consisting of four firms in seven Member States. By the closing date, CERN had received five tenders from four firms and one consortium in five Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium JOINT VENTURE CCC (CH-DE-AT), the lowest bidder after realignment, for the supply and installation of prefabricated reinforced-concrete modules for the PX15 access shaft for a total amount of 988 915 Swiss francs, not subject to revision. The consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal: DE-89%; CH-6%; AT-5%.

  20. Proposal for the award of a blanket contract for the supply and installation of automatic fire-detection and emergency-evacuation equipment

    CERN Document Server

    2003-01-01

    This document concerns the award of a blanket contract for the supply and installation of automatic fire-detection and emergency-evacuation equipment. Following a market survey carried out among 54 firms in ten Member States, a call for tenders (IT-3090/ST) was sent on 29 August 2003 to one firm and four consortia in five Member States. By the closing date, CERN had received four tenders from four consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a blanket contract with the consortium HEKATRON (DE) - SOTEB (FR), the lowest bidder, for the supply and installation of automatic fire-detection and emergency-evacuation equipment for a total amount not exceeding 1 900 000 euros (2 946 650 Swiss francs), subject to revision for inflation from 1 January 2007. The rate of exchange used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: DE - 70%; FR - 30%.

  1. Lowest Price, Technically Acceptable Evaluation Criteria Used in the November 2014 Request for Proposal for the Program Executive Office Soldier Systems Engineering and Technical Assistance (SETA) Contract

    Science.gov (United States)

    2017-09-01

    GS-0895-09 Industrial Engineering Technician 23.04 7.56 GS-0810-09 Civil Engineering Developmental (Programming) 23.04 7.56 GS-0810-11 Civil ... Engineering –Programming 27.88 9.14 GS-0810-12 Civil Engineering –Design 33.41 10.96 GS-2210-09 Info Tech Spec (Network Systems/Customer Support) 23.04...USED IN THE NOVEMBER 2014 REQUEST FOR PROPOSAL FOR THE PROGRAM EXECUTIVE OFFICE SOLDIER SYSTEMS ENGINEERING AND TECHNICAL ASSISTANCE (SETA) CONTRACT

  2. Collapse settlement in compacted soils

    CSIR Research Space (South Africa)

    Booth, AR

    1977-01-01

    Full Text Available Research into collapse settlement in compacted soils is described, with special reference to recent cases in Southern Africa where collapse settlement occurred in road embankments following wetting of the soil. The laboratory work described...

  3. 77 FR 27055 - Proposed Settlement Agreement

    Science.gov (United States)

    2012-05-08

    ...: Submit your comments, identified by Docket ID number EPA-HQ- OAR-2011-0344, online at www.regulations.gov... Nonhazardous Secondary Materials (NHSM) rule on the standards, 76 FR 15456 (Mar. 21, 2011), which rule had the..., whether submitted electronically or in paper, will be made available for public viewing online at www...

  4. 75 FR 36654 - Proposed Settlement Agreement

    Science.gov (United States)

    2010-06-28

    ... other related actions. EPA agrees to engage in a public process within a specific time frame to...) is detected. The public process shall take the form of a workshop, hearing, or other public process... potentially resolve petitions for judicial review filed by Navistar for review of the following: (1) An EPA...

  5. 76 FR 56194 - Proposed Settlement Agreement

    Science.gov (United States)

    2011-09-12

    ... Company, Gladieux Trading and Marketing, Insight Equity Acquisition Partners, LP, Liquidtitan, LLC and... being introduced at that time. Petitioners filed petitions for review and administrative reconsideration...

  6. 76 FR 71026 - Proposed Settlement Agreement

    Science.gov (United States)

    2011-11-16

    .... Under the rule, suppliers of fossil fuels or industrial greenhouse gases, manufacturers of vehicles and..., ``Mandatory Reporting of Greenhouse Gases from Magnesium Production, Underground Coal Mines, Industrial... EPA's final rule entitled ``Mandatory Reporting of Greenhouse Gases from Magnesium Production...

  7. 76 FR 67728 - Proposed Settlement Agreement

    Science.gov (United States)

    2011-11-02

    ...). The RICE NESHAP requires certain subcategories of four-stroke rich burn spark-ignition RICE to meet an... provisions to allow owners and operators of spark-ignition four-stroke rich burn engines that meet an... to revise the RICE NESHAP to allow owners and operators of spark-ignition 4-stroke rich burn engines...

  8. 77 FR 282 - Proposed Settlement Agreement

    Science.gov (United States)

    2012-01-04

    ... meet the definition of emergency engine if they operated more than fifteen hours in such circumstances... and operators of emergency stationary internal combustion engines to operate emergency stationary internal combustion engines in emergency conditions, as defined in those regulations, as part of an...

  9. Sanitation in informal settlements

    DEFF Research Database (Denmark)

    Unterrainer, Walter

    2015-01-01

    and to cure when having the right means. This is a humanitarian scandal. In Dharavi / Mumbai, an estimated 700.000 people live and work on less than 250 hectares in a hybrid mix of formal and informal settlement. According to an UN report, in 2006 one toilet seat existed for 1440 dwellers while...

  10. Proposal for the award of a blanket purchase contract for the design, supply, installation and maintenance of automatic fire-detection, fire-protection and voice-alarm systems for the Super Proton Synchrotron

    CERN Document Server

    2017-01-01

    Proposal for the award of a blanket purchase contract for the design, supply, installation and maintenance of automatic fire-detection, fire-protection and voice-alarm systems for the Super Proton Synchrotron

  11. Proposal for the Award of Three Contracts without competitive tendering or Design Calculations and Drawings for the Reinforced Concrete Work in LEP Surface Buildings and Supervision of their Implementation

    CERN Document Server

    1987-01-01

    Proposal for the Award of Three Contracts without competitive tendering or Design Calculations and Drawings for the Reinforced Concrete Work in LEP Surface Buildings and Supervision of their Implementation

  12. Proposal for the award of a contract for the design, supply, installation and commissioning of a Heating, Ventilation and Air-Conditioning (HVAC) system for the computer room of the CERN Control Centre

    CERN Document Server

    2012-01-01

    Proposal for the award of a contract for the design, supply, installation and commissioning of a Heating, Ventilation and Air-Conditioning (HVAC) system for the computer room of the CERN Control Centre

  13. 76 FR 22128 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-04-20

    ... for Hydroelectric Power Development at the Granby Dam Outlet, a Feature of the Colorado-Big Thompson... Reclamation, will consider proposals for non-Federal development of hydroelectric power at Granby Dam Outlet of the C-BT, Colorado. Reclamation is considering such hydroelectric power development under a lease...

  14. TARGET 2 and Settlement Finality

    Directory of Open Access Journals (Sweden)

    Ivan MANGATCHEV

    2011-03-01

    Full Text Available This article examines how TARGET 2 as system implements the idea of settlement finality regulated by Directive 98/26 EC of the European parliament and of the Council of 19 May 1998 on settlement finality in payment and securities settlement systems (Settlement Finality Directive and Directive 2009/44/EC of the European parliament and of the Council of 6 May 2009 amending Directive 98/26/EC on settlement finality in payment and securities settlement systems and Directive 2002/47/EC on financial collateral arrangements as regards linked systems and credit claims (Directive 2009/44/EC. As the title of the arti and finality of the settlement in this system.

  15. Reviving Ulysses contracts.

    Science.gov (United States)

    Spellecy, Ryan

    2003-12-01

    Ulysses contracts have faced paternalism objections since they first were proposed. Since the contracts are designed to override a present request from a legally competent patient in favor of a past request made by that patient, enforcement of these contracts was argued to be unjustifiable strong paternalism. Recent legal developments and new theories of practical reasoning suggest that the discussion of Ulysses contracts should be revived. This paper argues that with a proper understanding of the future-directed planning embodied in Ulysses contracts, the charge of strong paternalism can be answered, and the enforcement of some Ulysses contracts may be justified under the rubric of weak paternalism.

  16. The settlement of foundation of existing large structure on soft ground and investigation of its allowable settlement

    International Nuclear Information System (INIS)

    Okamoto, Toshiro

    1987-01-01

    In our laboratory a study of siting on quarternary ground is followed to make possible to construct a nuclear power plant on soil ground in Japan, a important subject is to understand bearing capacity, settlement and seismic responce of foundation. So measured data are collected about relation between ground and type of foundation, total settlement and differential settlement of already constructed large structures, and it is done to investigate the real condition and to examine allowable settlement. Investigated structures are mainly foreign nuclear power plant and domestic and foreign high buildings. The higher buildings are, the more raft foundation are for type of foundation and the higher contact pressure are to similar to a nuclear power plant. So discussion is done about mainly raft foundation. It is found that some measured maximum total settlements are larger than already proposed allowable values. So empirical allowable settlement is derived from measured values considering the effect of the width of base slab, contact pressure and foundation ground. Differential settlement is investigated about relation to maximum total settlement, and is formulated considering the width and the rigidity of base slab. Beside the limit of differential settlement is obtained as foundation is damaged, and the limit of maximum total settlement is obtained by combining this and above mentioned relation. Obtained allowable value is largely influenced by the width of base slab, and becomes less severe than some already proposed values. So it is expected that deformation of foundation is rationaly investigated when large structure as nuclear power plant is constructed on soft ground. (author)

  17. Formal and relational contracts between organizations: proposal of a model for analysis of the transactional and governance structure characteristics of comparative cases

    Directory of Open Access Journals (Sweden)

    Luciana Cardoso Siqueira Ambrozini

    Full Text Available Abstract The literature indicates that the use of formal and relational governance structures have a fundamental role in the conduct and maintenance of inter-organizational relationships. Nevertheless, there are possibilities for discussions about the composition and function of these structures in the presence of different transactional characteristics. Thus, a model based on the literatures of formal contracts, inter-organizational relationships, Relational Contract Theory, and Transaction Cost Economics is proposed. Since this is a qualitative exploratory research, six structured interviews were carried out and interpreted by means of Content Analysis for case comparison and discussion of theoretical propositions. It was observed that some transactional characteristics, when present with greater intensity in the context of a transaction, tend to corroborate the theoretical propositions of formal contractual function, demonstrating that the intensity of these characteristics is a relevant factor for analyzing the adequacy of governance structures. Likewise, the use of different relational norms presents variations within each characteristic analyzed. Other aspects explored in the Content Analysis are suggested in the composition of the analysis model. The propositions explored regarding the composition of the transaction context and the complementarity of governance structure of inter-organizational relationships are also discussed.

  18. Contributions for the measurement of the impact of the training for work policy: A proposal for the assessment of the apprenticeship contract in Colombia

    Directory of Open Access Journals (Sweden)

    Juan Carlos Segura Ortiz

    2016-09-01

    Full Text Available The apprenticeship contract (AC is a training for work strategy that combines training in vocational aspects with a practical phase in a company. This dual training model presents advantages in terms of the improvement of workers’ employability perspectives and income, together with a reduced employee selection risk. Given the formal purpose of this training instrument in Colombia, there is an interest in evaluating its results in order to improve and correct the instrument’s current performance and to optimize its effective impact. Here, the authors offer a proposal for the assessment of the impact of ACs, based on the measurement of differences in levels of income of individuals who, having chosen technical vocational training, chose this contract as an alternative in the process’ practical phase. The text also includes a review of the relevant literature on AC, a description of the type of statistical model that has to be used in the evaluation, and a description of the data necessary to help the company advance.

  19. Proposal for the award of a contract for the supply of austenitic steel strips for collars of the LHC superconducting dipole magnets

    CERN Document Server

    1999-01-01

    This document concerns the award of a contract for the supply of 410 mm-wide austenitic steel strips for the collars of the LHC superconducting dipole magnets. Following a market survey carried out among 39 firms in twelve Member States and two firms in Japan, a call for tenders (IT-2618/LHC/LHC) was sent on 3 June 1999 to five firms in four Member States and two firms in Japan. The Council agreed to the Management?s proposal to invite Japanese industry to participate, where appropriate, in calls for tenders for supplies for the LHC Project (CERN/CC/2110). By the closing date, CERN had received six tenders. The Finance Committee is invited to approve the negotiation of a contract with the firm NIPPON STEEL CORPORATION (JP) for the supply of 11 000 tonnes of 410 mm-wide austenitic steel strips for the collars of the LHC superconducting dipole magnets for a total amount of 4 298 943 000 Japanese yen, subject to revision for contractual deliveries after 31 December 2000, with an option for the supply of up to 10...

  20. Proposal to increase the amount of an existing contract for the provision of a high-speed data circuit to the USA

    CERN Document Server

    2003-01-01

    This document concerns the proposal to increase the authorized amount of an existing contract for the provision of a high-speed data circuit for Wide Area Network (WAN) connectivity between CERN and the STARLIGHT Internet Exchange in Chicago, USA. The extension will be negotiated by CERN on behalf of its partners, CNRS/IN2P3 (FR), the US Department of Energy (DoE) through the California Institute of Technology (Caltech), the US National Science Foundation (NSF), the Canadian high-energy physics community through the University of Victoria (Canada), the World Health Organization (WHO) in Geneva and the European Union funded DataTAG project. The Finance Committee is invited to approve the increase of the authorized amount of the existing contract with T-SYSTEMS INTERNATIONAL (DE) for the provision of a high-speed data circuit for an additional amount of 1 731 106 euros (2 596 660 Swiss francs), bringing the total authorized limit to 5 821 000 Swiss francs, not subject to revision. The amount in Swiss francs has...

  1. Foundation Settlement Prediction Based on a Novel NGM Model

    Directory of Open Access Journals (Sweden)

    Peng-Yu Chen

    2014-01-01

    Full Text Available Prediction of foundation or subgrade settlement is very important during engineering construction. According to the fact that there are lots of settlement-time sequences with a nonhomogeneous index trend, a novel grey forecasting model called NGM (1,1,k,c model is proposed in this paper. With an optimized whitenization differential equation, the proposed NGM (1,1,k,c model has the property of white exponential law coincidence and can predict a pure nonhomogeneous index sequence precisely. We used two case studies to verify the predictive effect of NGM (1,1,k,c model for settlement prediction. The results show that this model can achieve excellent prediction accuracy; thus, the model is quite suitable for simulation and prediction of approximate nonhomogeneous index sequence and has excellent application value in settlement prediction.

  2. 15 CFR 719.19 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Settlement. 719.19 Section 719.19... Settlement. (a) Settlements before issuance of a NOVA. When the parties have agreed to a settlement of the case, the Director of the Office of Export Enforcement will recommend the settlement to the Secretary...

  3. The Settlement Utopia

    DEFF Research Database (Denmark)

    Villadsen, Kaspar

    2016-01-01

    terms. This article explores the trajectory of the comparatively under-researched Danish offspring of the movement. It demonstrates the tempering and compromise that occurred when utopian ideals of ‘brotherly love’, ‘God’s Kingdom’, and ‘radical social change’ were realized in concrete social...... arrangements. Contradictions and ambiguities arose when utopian ideas were confronted with what could be done. The Settlement became a highly ambiguous space, a ‘heterotopia’. The roots of the contradictions cannot simply be identified in the external pressure of legal requirements and funding criteria...

  4. Banking contracts

    OpenAIRE

    Durčáková, Klára

    2010-01-01

    Resumé - Bank Contracts Bank Contracts are an integral part of our everyday lives. Citizen and bussines entities used bank contracts very often. Despite this fact we can't find legal definition in the Czech law. Banking contracts understand contracts that are signed by banks in their business activities and obligations under these contracts arise. While the banking contracts have been widely used, in Czech law there is not too much literature and judgements abou this issue. Lack of legislatio...

  5. Trust Mines: Legal Documents and Settlements

    Science.gov (United States)

    Legal Documents and Settlements related to the Northern Abandoned Uranium Mines Region including the Phase 1 Settlement Agreement and Environmental Response Trust Agreement, Phase 2 Settlement Agreement Removal Site Evaluation (RSE) Trust Agreement.

  6. Retractable Contracts

    Directory of Open Access Journals (Sweden)

    Franco Barbanera

    2016-02-01

    Full Text Available In calculi for modelling communication protocols, internal and external choices play dual roles. Two external choices can be viewed naturally as dual too, as they represent an agreement between the communicating parties. If the interaction fails, the past agreements are good candidates as points where to roll back, in order to take a different agreement. We propose a variant of contracts with synchronous rollbacks to agreement points in case of deadlock. The new calculus is equipped with a compliance relation which is shown to be decidable.

  7. Contract design

    International Nuclear Information System (INIS)

    Bradley, P.

    2006-01-01

    The current state of the electric power industry in Ontario was discussed with particular reference to the procurement of contracts and why the Ontario Power Authority (OPA) must be contracting to resolve many of Ontario's electricity issues. As Ontario increasingly relies on imports and natural gas-fired generation, the price of electricity continues to rise given that supply is at a low level. In addition to the generation gap, there are also several transmission constrained areas in Ontario, particularly in the Greater Toronto Area (GTA). The OPA announced 2 projects totalling 1900 MW to relieve congestion. According to the Independent Electricity System Operator (IESO), the total potential opportunity for new generation by 2015 is about 5,000 to 7,000 megawatts. OPA is expected to launch procurement processes for up to 1000 MW of cogeneration, 250 MW of province-wide conservation initiatives, 1900 MW of generation in the western part of the GTA, and 600 MW of generation in downtown Toronto. New nuclear capacity is also anticipated in addition to renewables and conservation/demand management (CDM) initiatives. The OPA's competitive procurement processes will include requests for expressions of interest, requests for qualifications and requests for proposals. The challenge of balancing the technical complexities and realities of procuring generation assets with the need for a fair procurement process was discussed. Contracts will be designed to react to market signals and will include 3 styles: tariff style, tolling style and standard offer contract. OPA will make every effort to balance generator and ratepayer interests. 6 figs

  8. Copyright Preemption of Contracts

    OpenAIRE

    Bohannan, Christina

    2008-01-01

    This Article argues that both courts and scholars are wrong in their categorical approaches to preemption of contracts under the Copyright Act, and proposes an intermediate approach that recognizes the importance of both contract rights and federal policy in preemption analysis. First, it argues that both courts and scholars have misapplied preemption law to breach of contract claims. Although the two sides tend to favor opposite results, they take equally categorical approaches. Categori...

  9. Forward contract - minimize the exchange risk

    OpenAIRE

    Martin Maršík; František Vebr

    1998-01-01

    How can a Czech export (import) company hedge exchange risk? Some of the possibilities are these: 1/ use only CZK for foreign contracts; 2/ matching payments in the same or a parallel currency; 3/ use the products of the money markets; 4/ use the products of the forward market - FORWARD CONTRACT The forward market offers a forward contract to buy or sell a fixed amount of currency at a fixed price on a specific date in the future. The settlement of the contract is in more than two days. The e...

  10. Fortified settlement Veletin

    Directory of Open Access Journals (Sweden)

    Jovanović Vojislav S.

    2003-01-01

    Full Text Available Remnants of the fortified settlement Veletin are located on a hill of the same name (map marking 969 near the small town Janjevo, in the vicinity of the Monastery Gračanica in Kosovo, in a region rich in metal ore (pic. 1-3. Veletin is mentioned for the first time as a landmark in King Milutin’s charter for the Monastery Gračanica issued in 1321. Namely, the boundary of villages donated to the monastery ran "from Oštri vrh on Veletjen between Sušica and between Gušterica". Villages of Sušica and Gušterica still exist under the same names. The mentioned Veletin refers to the hill with a fortified settlement or fortress at the top. In the past the hill and the fortress were for a long time a characteristic part of the historical landscape. Thanks to its favourable geostrategic position, vicinity of important roads and above all to the nearness of rich silver mines, the hill of Veletin was settled and fortified in pre-historic time, then in antiquity and in the middle ages. It is supposed that the Roman town Ulpiana (Justiniana Secunda, near the Monastery Gračanica, developed because of the vicinity of silver mines and that as a municipium became a center of administration of Janjevo - Novo Brdo metals in the II c. Mining reached its peak in this area only in the first half of the XV c., during the reign of Serbian despots. When this part of Serbia fell under Turkish rule in 1455, mining began to decline. In 1488, during the reign of Sultan Bajazet II, special regulations were made for the organization of work in Janjevo silver mines, which testify about their importance. It is hard to form an opinion about the appearance of Veletin at the time the Gračanica Charter was issued. Mining was growing at that time and it is possible that there was a fortress with a small crew to protect Janjevo and other nearby mining settlements. Veletin is explicitly mentioned as a fortress only in three cartographic sources of a later date. The first was

  11. 7 CFR 1427.21 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Settlement. 1427.21 Section 1427.21 Agriculture... § 1427.21 Settlement. (a) The settlement of cotton loans will be made by CCC on the basis of the quality... maximum storage credit rates as determined and announced by CCC. (b) For purposes of settlements for...

  12. 49 CFR 511.26 - Settlement.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 6 2010-10-01 2010-10-01 false Settlement. 511.26 Section 511.26 Transportation...; Summary Judgment; Settlement § 511.26 Settlement. (a) Applicability. This section applies only to cases of..., 89 Stat. 911 (15 U.S.C. section 2007(3)). Settlement in other cases may be made only in accordance...

  13. 10 CFR 851.41 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Settlement. 851.41 Section 851.41 Energy DEPARTMENT OF ENERGY WORKER SAFETY AND HEALTH PROGRAM Enforcement Process § 851.41 Settlement. (a) DOE encourages settlement of a proceeding under this subpart at any time if the settlement is consistent with this part. The...

  14. 29 CFR 2200.100 - Settlement.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Settlement. 2200.100 Section 2200.100 Labor Regulations... Miscellaneous Provisions § 2200.100 Settlement. (a) Policy. Settlement is permitted and encouraged by the... parties include any particular language in a settlement agreement, but does require that the agreement...

  15. 16 CFR 1025.26 - Settlements.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Settlements. 1025.26 Section 1025.26... PROCEEDINGS Prehearing Procedures, Motions, Interlocutory Appeals, Summary Judgments, Settlements § 1025.26 Settlements. (a) Availability. Any party shall have the opportunity to submit an offer of settlement to the...

  16. 10 CFR 590.309 - Settlements.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Settlements. 590.309 Section 590.309 Energy DEPARTMENT OF... RESPECT TO THE IMPORT AND EXPORT OF NATURAL GAS Procedures § 590.309 Settlements. The parties may conduct settlement negotiations. If settlement negotiations are conducted during a conference, at the request of one...

  17. 7 CFR 1434.19 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Settlement. 1434.19 Section 1434.19 Agriculture... FOR HONEY § 1434.19 Settlement. The value of the settlement of loans shall be made by CCC on the... commodity: (1) If the value of the collateral at settlement is less than the amount due, the producer shall...

  18. 17 CFR 171.12 - Settlement.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Settlement. 171.12 Section 171... RESPONSIBILITY ACTIONS General Provisions § 171.12 Settlement. At any time before the Commission has reached a... settlement agreement. If, in its view, the settlement is consistent with the public interest, the Commission...

  19. Construction contracts law and management

    CERN Document Server

    Hughes, Will; Murdoch, John

    2015-01-01

    The fifth edition of this bestselling textbook has been thoroughly revised to provide the most up-to-date and comprehensive coverage of the legislation, administration and management of construction contracts. It now includes comparisons of working with JCT, NEC3, and FIDIC contracts throughout. Introducing this topic at the core of construction law and management, this book provides students with a one-stop reference on construction contracts. Significant new material covers: procurement tendering developments in dispute settlement commentary on all key legislation, case law and contract amendments In line with new thinking in construction management research, this authoritative guide is essential reading for every construction undergraduate and an extremely useful source of reference for practitioners.

  20. 29 CFR 18.9 - Consent order or settlement; settlement judge procedure.

    Science.gov (United States)

    2010-07-01

    ... has sole discretion to decide whether to appoint a settlement judge, except that a settlement judge... assigned to hear and decide the case. (ii) The settlement judge shall not be appointed to hear and decide... 29 Labor 1 2010-07-01 2010-07-01 true Consent order or settlement; settlement judge procedure. 18...

  1. Proposal for the award of an industrial service contract for stores operations and relatedlogistics, in-house mail distribution and transport services on the CERN site

    CERN Document Server

    2006-01-01

    This document concerns the award of an industrial support contract for stores operations and related logistics, in-house mail distribution and transport services on the CERN site. The Finance Committee is invited to agree to the negotiation of a contract with the consortium ISS (CH) - ISS (ES), for stores operations and related logistics, in-house mail distribution and transport services on the CERN site for a period of three years for a total amount not exceeding 10 312 028 Swiss francs not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period.

  2. Settlement of uranium mill tailings

    International Nuclear Information System (INIS)

    Chen, P.K.; Guros, F.B.; Keshian, B.

    1988-01-01

    Two test embankments were constructed on top of an old tailings deposit near Ambrosia Lake, New Mexico to determine settlement characteristics of hydraulically- deposited uranium mill tailings. Before construction of the embankments, properties of in-situ tailings and foundation soils were determined using data from boreholes, piezocone soundings, and laboratory tests. These properties were used to estimate post-construction settlement of a planned disposal embankment to be constructed on the tailings. However, excessive uncertainty existed in the following: field settlement rates of saturated and unsaturated tailings, degree of preconsolidation of the upper 15 feet of tailings, and the ability of an underlying silty sand foundation layer to facilitate drainage. Thus, assurance could not be provided that differential settlements of the radon barrier and erosion protection layers would be within allowable limits should the planned disposal embankment be constructed in a single-stage

  3. Claims for Unabsorbed Overhead on Defense Contracts.

    Science.gov (United States)

    1985-09-01

    coat which, under the provisions of any pertinent law, regulation, or contract, cannot be included in prices, cost reimbureements , or settlements...ruled that the contractor was due some reimbursement . " - Allegheny appealed the contracting officer’s determination a second time questioning how much...amount of reimbursement . The final opinion also added the cost that was substantiated for replacement of operators and make-up pay. Therefore, the

  4. Proposal for the award of a contract for the supply of motor unit for the jacks for the LHC low-beta quadrupoles

    CERN Document Server

    2005-01-01

    This document concerns the award of a contract for the supply of 134 motor units for the jacks for the LHC low-beta quadrupoles. The Finance Committee is invited to agree to the negotiation of a contract with ZTS VVU KOSICE (SK), the lowest bidder, for the supply of 134 motor units for a total amount of 1 266 674 Swiss francs, not subject to revision.

  5. A Multi-Scale Settlement Matching Algorithm Based on ARG

    Science.gov (United States)

    Yue, Han; Zhu, Xinyan; Chen, Di; Liu, Lingjia

    2016-06-01

    Homonymous entity matching is an important part of multi-source spatial data integration, automatic updating and change detection. Considering the low accuracy of existing matching methods in dealing with matching multi-scale settlement data, an algorithm based on Attributed Relational Graph (ARG) is proposed. The algorithm firstly divides two settlement scenes at different scales into blocks by small-scale road network and constructs local ARGs in each block. Then, ascertains candidate sets by merging procedures and obtains the optimal matching pairs by comparing the similarity of ARGs iteratively. Finally, the corresponding relations between settlements at large and small scales are identified. At the end of this article, a demonstration is presented and the results indicate that the proposed algorithm is capable of handling sophisticated cases.

  6. A Multi-Scale Settlement Matching Algorithm Based on ARG

    Directory of Open Access Journals (Sweden)

    H. Yue

    2016-06-01

    Full Text Available Homonymous entity matching is an important part of multi-source spatial data integration, automatic updating and change detection. Considering the low accuracy of existing matching methods in dealing with matching multi-scale settlement data, an algorithm based on Attributed Relational Graph (ARG is proposed. The algorithm firstly divides two settlement scenes at different scales into blocks by small-scale road network and constructs local ARGs in each block. Then, ascertains candidate sets by merging procedures and obtains the optimal matching pairs by comparing the similarity of ARGs iteratively. Finally, the corresponding relations between settlements at large and small scales are identified. At the end of this article, a demonstration is presented and the results indicate that the proposed algorithm is capable of handling sophisticated cases.

  7. Guidelines and criteria for planning Slovenian settlements

    Directory of Open Access Journals (Sweden)

    Andrej Pogačnik

    2001-01-01

    Full Text Available The article deals with proposals for directing settlement development and management in Slovenia on the national level. They should be integrated in the spatial order, a part of the national spatial plan. First a short chronology of research with similar topics and simultaneous critical analysis is presented. The methodology and possible models for structuring directives is elaborated. Based on recent research by domestic authors, European guidelines and own ideas, a manual was devised, dividing guidelines hierarchically between the national, regional and local level. The second part or rather different type of text attached to the manual is a glossary. It also includes an index for further research of various sources.

  8. Proposal for the award of an industrial services contract for the operation and maintenance of the CERN electrical network and the inspection and supervision of the electrical installation work

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract, without competitive tendering, for the supply of two cabling machines for the production of superconducting cable for the LHC main magnets. These cables are of two different types, hereafter referred as Cable 1 and Cable 2. For the reasons set out in this document, the Finance Committee is invited to agree to the negotiation of a contract with SETIC (FR) for the supply of two cabling machines, for a total amount not exceeding 3 200 000 euros (4 948 800 Swiss francs), not subject to revision. The rate of exchange which has been used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FR - 100%.

  9. Judging Fairness in Class Action Settlements

    Directory of Open Access Journals (Sweden)

    Catherine Piché

    2010-02-01

    Full Text Available In this paper, I describe the face of modern civil justice and discuss four paradoxes which justify re-evaluating the role of the judge responsible for reviewing class action settlements, in light of modern judicial culture. I also critically evaluate the existing procedures applicable to the fairness review as well as the judicial role described in the caselaw and doctrine, before suggesting a revised, three-parted role for the reviewing judge in the class action settlement context. Ultimately, I suggest that to reach fairness of process and outcome in class action settlements, judges should remain active and creative in their inquisitorial assessment of proposed class action settlements. They should also remain conciliatory, participating in the search for solutions regarding the proposed settlement, always seeking to find the truth (and what is “just” about the proposed settlement, in the utmost respect for the rights of absent class members, the respect of their interests, and the additional consideration of the interests of the defendants and of the public. Dans cet article, je présente l’état de la face de la justice civile moderne et je discute quatre paradoxes qui justifient une réévaluation du rôle du juge responsable de la révision et de l’approbation d’un règlement de recours collectif, à la lumière de la culture juridique moderne. Je propose aussi une évaluation critique des procédures en place s’appliquant à l’évaluation du caracters équitable de la transaction, de même que le rôle du juge décrit dans la jurisprudence et la doctrine, avant de suggérer un rôle révisé. Ce rôle modifié se décline en trois parties. Finalement, je suggère que pour atteindre l’équité de procédure et de résultat dans le cas de règlements en recours collectif, les juges devraient demeurer actifs et créatifs en enquêtant pour évaluer des règlements proposés dans les cas de recours collectifs. Ils et elles

  10. Proposal for the award of a contract, without competitive tendering, for the supply of eight glass-coated beryllium mirrors for the LHCb RICH1 detector

    CERN Document Server

    2004-01-01

    This document concerns the award of a contract, without competitive tendering, for the supply of eight glass-coated beryllium mirrors for the LHCb RICH1 detector. The Finance Committee is invited to agree to the negotiation of a contract, without competitive tendering, with the ISTC Moscow (RU) for the supply of eight glass-coated beryllium mirrors for a total amount of 282 000 US dollars, not subject to revision. At the present rate of exchange this is equivalent to approximately 370 000 Swiss francs. The contract will be financed by PPARC (GB) and CERN. PPARC will contribute 65 000 US dollars (approximately 85 000 Swiss francs) and CERN will contribute 217 000 US dollars (approximately 285 000 Swiss francs).

  11. Processes of Integration and Fragmentation of Economic Space: The Structure of Settlement Systems

    Directory of Open Access Journals (Sweden)

    Alexander Pavlovich Goryunov

    2017-12-01

    Full Text Available This work presents a study of processes of integration and fragmentation caused by the polarization of economic space. Under integration in economic space the authors understand the formation of new and transformation of existing settlement systems, while fragmentation is the dissolution of settlement systems and their transformation into loosely connected settlement networks. The study focuses on the structure of settlement systems. Authors propose a new method for studying the structure of settlement systems, which combines the use of factor analysis, multidimensional scaling, and cluster analysis. The proposed method utilizes the maximum of available information about the social-economic status of settlements to reveal regularities in their spatial organization. The authors test the proposed method on 35 large cities of the Central and Volga federal districts of Russia, which comprise the spatial surroundings of Moscow. The authors find four groups of cities forming the core of the settlement system centered around Moscow, a group of four cities forming a buffer zone around that system, as well as four cities in the studied sample which do not participate in the settlement system

  12. Proposal for the award of a contract, without competitive tendering, for the supply and upgrade of positioning sensors for the LHC

    CERN Document Server

    2004-01-01

    This document concerns the award of a contract, without competitive tendering, for the supply of 60 new Hydrostatic Leveling Systems (HLS sensors) and 25 new Wire Positioning Systems (WPS sensors) and for the upgrade of 63 existing sensors. For the reasons explained in this document, the Finance Committee is invited to agree to the negotiation of a contract with FOGALE NANOTECH (FR), for the supply and upgrade of HLS and WPS sensors for a total amount of 412 913 euros (631 757 Swiss francs), not subject to revision. The amount in Swiss francs has been calculated using the present rate of exchange.

  13. Proposal for the award of a blanket order contract for the supply of microprocessor-based protection and control devices for the CERN HV distribution network

    CERN Document Server

    2004-01-01

    This document concerns the award of a blanket contract for the supply of microprocessor-based protection and control devices for the CERN HV distribution network. The Finance Committee is invited to agree to the negotiation of a blanket order contract with SCHNEIDER ELECTRIC (PT), the lowest technically acceptable bidder after realignment, for the supply of microprocessor-based protection and control devices for the CERN HV distribution network for a total amount of 1 900 000 euros (2 924 128 Swiss francs), subject to revision for inflation after 1 January 2007. The rate of exchange used is that stipulated in the tender

  14. Basic Characteristics and Spatial Patterns of Pseudo-Settlements--Taking Dalian as An Example.

    Science.gov (United States)

    Gao, Jiaji; Zhang, Yingjia; Li, Xueming

    2016-01-20

    A person's living behavior patterns are closely related to three types of settlements: real-life settlements, imagined settlements, and pseudo-settlements. The term "pseudo-settlement" (PS) refers to the places that are selectively recorded and represented after the mass media chose and restructure the residence information. As the mass media rapidly develops and people's way of obtaining information gradually change, PS has already become one of the main ways for people to recognize and understand real-life settlements, as well as describe their impressions of imagined settlements. PS also has a profound impact on tourism, employment, investment, migration, real estate development, etc. Thus, the study of PSs has important theoretical and practical significance. This paper proposes to put forward residential quarters where the mass media is displayed as the object of study and establishes the pseudo-settlement index system of Dalian in and elaborate analysis of the concept of PSs. From three aspects, including pseudo-buildings, pseudo-districts and pseudo-culture, this paper uses the ArcGIS 10.0 kernel density (spacial analyst) to analyze and interpret the basic characteristics and spatial patterns of 14 elements of the PS in Dalian. Through systemic clustering analysis, it identifies eight major types of PSs in Dalian. Then it systematically elaborates current situations and characteristics of the spatial pattern of PSs in Dalian, namely: regionally concentrated, widely scattered and blank spaces without pseudo-settlements. Finally, this paper discusses the mechanism of formation of PSs in Dalian.

  15. 48 CFR 49.606 - Granting subcontract settlement authorization.

    Science.gov (United States)

    2010-10-01

    ...-furnished material or articles completed but undelivered under the subcontract or purchase order, as these... articles may be disposed of without Government approval or screening if the total amount (at subcontract... retention or other disposal of termination inventory allocated to the settlement proposal. (ii) Deduct...

  16. Proposal for the award of three contracts for the provision of temporary labour on the Swiss part of the CERN site

    CERN Document Server

    2002-01-01

    This document concerns the award of three contracts for the provision of temporary labour on the Swiss part of the CERN site. Following a market survey carried out among 71 firms in thirteen Member States, a call for tenders (IT-2875/HR) was sent on 11 July 2001 to nine firms and six consortia, one consisting of three firms, five consisting of two firms, in eight Member States. By the closing date, CERN had received 12 tenders from eight firms and four consortia in five Member States. The Finance Committee is invited to agree to the negotiation of three contracts for the provision of temporary labour on the Swiss part of the CERN site with CONSULTOR (PL), ADECCO (CH) and FLEX-FORCE (CH)/TEMP-TEAM (NO). The total maximum amount for all three contracts is, for an initial period of three years starting 1 July 2002, 5 500 000 Swiss francs, subject to revision for inflation from 1 January 2003. The contracts will include an option for two further one-year extensions beyond the initial three-year period. The firms ...

  17. Proposal for the award of two contracts for the provision of mechanical design and draughting services on and off the CERN Site

    CERN Document Server

    2006-01-01

    This document concerns the award of two contracts for the provision of mechanical design and draughting services on and off the CERN site. The Finance Committee is invited to agree to the negotiation of two contracts with: 1. ACROTECNA (FR), the lowest bidder, for approximately 55% of the provision of mechanical design and draughting services on and off the CERN site, for a period of three years for a total amount not exceeding 794 200 euros (1 239 006 Swiss francs), not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period. The rate of exchange used is that stipulated in the tender. 2. TECNICAS AERONAUTICAS MADRID (ES), the joint lowest bidder after alignment, for approximately 45% of the provision of mechanical design and draughting services on and off the CERN site, for a period of three years for a total amount not exceeding 1 013 730 Swiss francs, not subject to revision. The contract will include options for two one-year extensions beyond...

  18. Claims in civil engineering contracts

    CERN Document Server

    Speirs, N A

    1999-01-01

    This paper considers claims arising during civil engineering construction contracts. The meaning of the word 'claim' is considered and its possible implications for additional cost and time to completion. The conditions of the construction contract selected will influence the risk apportionment between contractor and client and the price offered by the contractor for the work. Competitive bidding constraints and profit margins in the construction industry, however, may also influence the price offered. This in turn can influence the likelihood of claims arising. The client from his point of view is concerned to complete the work within an agreed time and budget. The circumstances under which claims may arise are reviewed in relation to typical conditions of contract. These circumstances are then related to the CERN LHC civil works. Ways of avoiding claims, where this is possible, are considered. Finally, the means of evaluation of claims and their settlement are considered.

  19. Monitoring informal settlements using SAR polarimetry

    CSIR Research Space (South Africa)

    Kleynhans, W

    2012-10-01

    Full Text Available for settlement mapping and detection has remained largely unexplored in Southern Africa. The objective of this study is to investigate the possible role that SAR polarimetry could play in the monitoring of informal settlements....

  20. Prediction of embankment settlement over soft soils.

    Science.gov (United States)

    2009-06-01

    The objective of this project was to review and verify the current design procedures used by TxDOT : to estimate the total and rate of consolidation settlement in embankments constructed on soft soils. Methods : to improve the settlement predictions ...

  1. 29 CFR 778.407 - The nature of the section 7(f) contract.

    Science.gov (United States)

    2010-07-01

    ... it is not in written form. Furthermore, the contract must be “bona fide.” This implies that both the making of the contract and the settlement of its terms were done in good faith. ... 29 Labor 3 2010-07-01 2010-07-01 false The nature of the section 7(f) contract. 778.407 Section...

  2. Proposal for the award of a contract for the supply of bake-out heating jackets for the LHC vacuum components

    CERN Document Server

    2006-01-01

    This document concerns the award of a contract for the supply of bake-out heating jackets for the LHC vacuum components. The Finance Committee is invited to agree to the negotiation of a contract with ELTHERM (DE), the lowest bidder, for the supply of heating jackets for a total amount of 711 567 euros (1 120 646 Swiss francs), not subject to revision, with an option for up to 15% additional heating jackets for an additional amount of up to 106 735 euros (168 097 Swiss francs), not subject to revision, bringing the total amount to 818 302 euros (1 288 743 Swiss francs), not subject to revision. The amounts in Swiss francs have been calculated using the present rate of exchange. 2006/68/5/e

  3. Proposal for the award of a contract, without competitive tendering, for the supply of radiation-tolerant anti-fuse FPGAs for the LHC

    CERN Document Server

    2004-01-01

    This document concerns the award of a contract, without competitive tendering, for the supply of 14 800 radiation-tolerant anti-fuse Field Programmable Gate Arrays (FPGAs) for the LHC. For the reasons explained in this document, the Finance Committee is invited to agree to the negotiation of a contract with MEMEC (CH), for the supply of 14 800 anti-fuse FPGAs for a total amount of 574 330 US dollars (654 900 Swiss francs), not subject to revision, with an option for up to 2960 additional anti-fuse FPGAs for an amount not exceeding 114 866 US dollars (130 980 Swiss francs) bringing the total amount to 689 196 US dollars (758 880 Swiss francs) not subject to revision. The amounts in Swiss francs have been calculated using the present rate of exchange.

  4. 7 CFR 1.345 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Settlement. 1.345 Section 1.345 Agriculture Office of... Under the Program Fraud Civil Remedies Act of 1986 § 1.345 Settlement. (a) A respondent may make offers of compromise of settlement at any time. (b) The reviewing official has the exclusive authority to...

  5. 29 CFR 2704.305 - Settlement.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Settlement. 2704.305 Section 2704.305 Labor Regulations... Settlement. In the event that counsel for the Secretary and an applicant agree to settle an EAJA claim after... of the settlement and request dismissal of the application. [63 FR 63177, Nov. 12, 1998] ...

  6. 37 CFR 11.26 - Settlement.

    Science.gov (United States)

    2010-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Settlement. 11.26 Section 11... Disciplinary Proceedings; Jurisdiction, Sanctions, Investigations, and Proceedings § 11.26 Settlement. Before or after a complaint under § 11.34 is filed, a settlement conference may occur between the OED...

  7. 32 CFR 536.55 - Structured settlements.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Structured settlements. 536.55 Section 536.55... AGAINST THE UNITED STATES Investigation and Processing of Claims § 536.55 Structured settlements. (a) The... of this part, structured settlements cannot be required but are encouraged in situations listed above...

  8. 7 CFR 1782.20 - Debt Settlement.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Debt Settlement. 1782.20 Section 1782.20 Agriculture... (CONTINUED) SERVICING OF WATER AND WASTE PROGRAMS § 1782.20 Debt Settlement. Pursuant to 7 U.S.C. 1981, this section prescribes policies for debt settlement of Water and Waste Disposal loans; Watershed loans and...

  9. 15 CFR 904.213 - Settlements.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Settlements. 904.213 Section 904.213 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) NATIONAL OCEANIC... and Appeal Procedures General § 904.213 Settlements. If settlement is reached before the Judge has...

  10. 7 CFR 1951.213 - Debt settlement.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 14 2010-01-01 2009-01-01 true Debt settlement. 1951.213 Section 1951.213 Agriculture... and Grants § 1951.213 Debt settlement. Subpart C of part 1956 of this chapter prescribes policies and procedures for debt settlement actions for loans covered under this subpart when it is determined that a debt...

  11. 24 CFR 28.45 - Settlements.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Settlements. 28.45 Section 28.45... IMPLEMENTATION OF THE PROGRAM FRAUD CIVIL REMEDIES ACT OF 1986 § 28.45 Settlements. (a) HUD and the respondent may enter into a settlement agreement at any time prior to the issuing of a notice of final...

  12. 24 CFR 3800.60 - Settlements.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Settlements. 3800.60 Section 3800... DEVELOPMENT INVESTIGATIONS IN CONSUMER REGULATORY PROGRAMS § 3800.60 Settlements. (a) At any time during an investigation, the Department and the parties subject to an investigation may conduct settlement negotiations...

  13. 15 CFR 990.25 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Settlement. 990.25 Section 990.25... DAMAGE ASSESSMENTS Authorities § 990.25 Settlement. Trustees may settle claims for natural resource damages under this part at any time, provided that the settlement is adequate in the judgment of the...

  14. 17 CFR 9.7 - Settlement.

    Science.gov (United States)

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Settlement. 9.7 Section 9.7... DISCIPLINARY, ACCESS DENIAL OR OTHER ADVERSE ACTIONS General Provisions § 9.7 Settlement. At any time before... accordance with § 9.20, the parties may file a stipulation for dismissal based on a settlement agreement...

  15. 13 CFR 134.217 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Settlement. 134.217 Section 134... BEFORE THE OFFICE OF HEARINGS AND APPEALS Rules of Practice for Most Cases § 134.217 Settlement. At any... have settled the case, and may file with such motion a copy of the settlement agreement. If the Judge...

  16. 7 CFR 1951.894 - Debt settlement.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 14 2010-01-01 2009-01-01 true Debt settlement. 1951.894 Section 1951.894 Agriculture... REGULATIONS (CONTINUED) SERVICING AND COLLECTIONS Rural Development Loan Servicing § 1951.894 Debt settlement. Debt settlement of all claims will be handled in accordance with the Federal Claims Collection...

  17. Polymorphic Contracts

    Science.gov (United States)

    Belo, João Filipe; Greenberg, Michael; Igarashi, Atsushi; Pierce, Benjamin C.

    Manifest contracts track precise properties by refining types with predicates - e.g., {x : Int |x > 0 } denotes the positive integers. Contracts and polymorphism make a natural combination: programmers can give strong contracts to abstract types, precisely stating pre- and post-conditions while hiding implementation details - for example, an abstract type of stacks might specify that the pop operation has input type {x :α Stack |not ( empty x )} . We formalize this combination by defining FH, a polymorphic calculus with manifest contracts, and establishing fundamental properties including type soundness and relational parametricity. Our development relies on a significant technical improvement over earlier presentations of contracts: instead of introducing a denotational model to break a problematic circularity between typing, subtyping, and evaluation, we develop the metatheory of contracts in a completely syntactic fashion, omitting subtyping from the core system and recovering it post facto as a derived property.

  18. Proposal for the award of blanket contracts for the supply of Intel-based desktop PCs, display monitors and portable PCs

    CERN Document Server

    2000-01-01

    This document concerns the award of blanket contracts for the supply of the three following categories of equipment for the period 2001-2004: a) desktop PCs (complete PC systems but without display monitors), b) display monitors (conventional CRTs or flat screen LCDs) and c) portable PCs (also called notebooks or laptops). Following a market survey carried out among 41 firms in fourteen Member States, an invitation to tender (IT-2692/IT) was sent on 19 May 2000 to 12 firms and three consortia, each consisting of two firms, in five Member States. By the closing date, CERN had received seven tenders, all from the Swiss subsidiaries of the firms and consortia. The Finance Committee is invited to agree to the negotiation of - blanket contracts with VOBIS (CH), ELONEX (CH) and FUJITSU-SIEMENS (CH), the three lowest bidders complying with the specification, for the supply of Desktop PCs; - blanket contracts with VOBIS (CH), SYNOPTIC (CH) and ELONEX (CH), the three lowest bidders offering display monitors manufactur...

  19. Proposal for the award of an industrial support contract for the maintenance of and work on tertiary buildings at CERN, and operation of their installations

    CERN Document Server

    2005-01-01

    This document concerns the award of a contract for maintenance of and work on tertiary (i.e. non-accelerator) buildings and operation of their installations. The Finance Committee is invited to agree to the negotiation of a contract with the consortium CEGELEC CENTRE EST (FR) â?" CEGELEC (CH) â?" G.T.M. (FR), the lowest bidder complying with the specification, for the provision of the maintenance of and work on tertiary buildings at CERN, and operation of their installations, for three years for a total amount not exceeding 9 346 650 euros (14 379 454 Swiss francs), not subject to revision until 1st January 2009, with options for additional services for an amount not exceeding 457 600 euros (704 000 Swiss francs), not subject to revision until 1st January 2009, bringing the total to an amount not exceeding 9 804 250 euros (15 083 454 Swiss francs), not subject to revision until 1st January 2009. The contract will include options for two one-year extensions beyond the initial three-year period.

  20. Proposal for the award of a contract for the supply of the MQY-type superconducting quadrupole magnets for the LHC insertions

    CERN Document Server

    2000-01-01

    This document concerns the award of a contract for the supply of the 22 twin-aperture MQY-type superconducting quadrupole magnets for the LHC insertions. Following a market survey (MS-2455/LHC/LHC) carried out among 21 firms in ten Member States and one firm in Japan, a call for tenders (IT-2750/LHC/LHC) was sent on 25 May 2000 to six firms and one consortium consisting of two firms in five Member States. By the closing date, CERN had received four tenders. The Finance Committee is invited to agree to the negotiation of a contract with the firm ACCEL INSTRUMENTS (DE), the lowest bidder, for the supply of the 22 MQY-type superconducting quadrupole magnets for the LHC insertions for a total amount of 4 372 950 Deutschmarks (3 488 603 Swiss francs), subject to revision for contractual deliveries after 31 December 2002, with an option for the supply of up to 5 additional MQY-type superconducting quadrupole magnets, for a total amount of 993 850 Deutschmarks (792 863 Swiss francs), subject to revision for contract...

  1. Proposal for the award of an industrial services contract for electrical installation work and maintenance of lighting and low-voltage distribution

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Services contract for electrical installation work and maintenance of lighting and low-voltage distribution. Following a market survey carried out among 127 firms in fifteen Member States, a call for tenders (IT-2754/ST) was sent on 2 June 2000 to three firms and four consortia, each consisting of two firms, in four Member States. By the closing date, CERN had received tenders from two firms and two consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium SPIE TRINDEL(FR) ? CONTROLMATIC (DE), the lowest bidder complying with the specified requirements, for an initial period of three years from 1 July 2001 for a total amount of 41 705 497 Swiss francs, not subject to revision until 31 December 2003. The contract will include options for two one-year extensions beyond the initial three-year period for a total amount of 27 803 664 Swiss francs, for which CERN will seek approval by the Finance ...

  2. Proposal for the award of a contract for the supply, installation and maintenance of radiation and environmental monitoring for the LHC

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the supply, installation and maintenance of radiation and environmental monitoring for the LHC. Following a market survey carried out among 53 firms in twelve Member States, a call for tenders (IT-3091/TIS/LHC) was sent on 17 July 2003 to seven firms and five consortia in eight Member States. By the closing date, CERN had received seven tenders from one firm and six consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium ASSYSTEM INDUSTRIAL SERVICES (FR) - GENITRON INSTRUMENTS (DE), the lowest bidder, for the supply, installation and maintenance of radiation and environmental monitoring for the LHC for a total amount not exceeding 5 474 000 euros (8 457 000 Swiss francs), subject to revision for inflation after 1 January 2007. The rate of exchange used is that stipulated in the tender. The consortium has indicated the following distribution by country of the contract value covered by this ...

  3. Proposal for the Award of Two Contracts for the Technical Services for Work on Components of CERN Particle Accelerators and High Energy Physics Experiments

    CERN Document Server

    2003-01-01

    This document concerns the award of two contracts for the technical services for work on components of CERN particle accelerators and high energy physics experiments. Following a market survey carried out among 73 firms in fourteen Member States, a call for tenders (IT-3156/SPL) was sent on 4 November 2002 to three consortia in four Member States. By the closing date, CERN had received tenders from the three consortia. The Finance Committee is invited to agree to the negotiation of two contracts with: 1) the consortium SERCO FACILITIES MANAGEMENT (NL) - GERARD PERRIER INDUSTRIE (FR) - INEO ALPES (FR), the lowest bidder, for approximately 55% of the technical services for work on components of CERN particle accelerators and high energy physics experiments, for an initial period of five years and for a total amount not exceeding 37 435 270 euros (54 902 500 Swiss francs), subject to revision for inflation from 1 January 2005. The contract will include options for two one-year extensions beyond the initial five-...

  4. Settlement during vibratory sheet piling

    NARCIS (Netherlands)

    Meijers, P.

    2007-01-01

    During vibratory sheet piling quite often the soil near the sheet pile wall will settle. In many cases this is not a problem. For situations with houses, pipelines, roads or railroads at relative short distance these settlements may not be acceptable. The purpose of the research described in this

  5. The Density of Sustainable Settlements

    DEFF Research Database (Denmark)

    Lauring, Michael; Silva, Victor; Jensen, Ole B.

    2010-01-01

    This paper is the initial result of a cross-disciplinary attempt to encircle an answer to the question of optimal densities of sustainable settlements. Urban density is an important component in the framework of sustainable development and influences not only the character and design of cities...

  6. Administrative contracts

    Directory of Open Access Journals (Sweden)

    Vukićević-Petković Milica

    2015-01-01

    Full Text Available Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete understanding of the importance and essence of this institution as well as the need for its complete legal regulation.

  7. Electrical contracting

    CERN Document Server

    Neidle, Michael

    2013-01-01

    Electrical Contracting, Second Edition is a nine-chapter text guide for the greater efficiency in planning and completing installations for the design, installation and control of electrical contracts. This book starts with a general overview of the efficient cabling and techniques that must be employed for safe wiring design, as well as the cost estimation of the complete electrical contract. The subsequent chapters are devoted to other electrical contracting requirements, including electronic motor control, lighting, and electricity tariffs. A chapter focuses on the IEE Wiring Regulations an

  8. Administrative contracts

    OpenAIRE

    Vukićević-Petković Milica

    2015-01-01

    Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete u...

  9. 48 CFR 815.404-1 - Proposal analysis techniques.

    Science.gov (United States)

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 815.404-1 Proposal analysis... necessary for initial and revised pricing of all negotiated prime contracts, including subcontract pricing...

  10. Proposal for the award of a contract for the supply of 26 000 lead-tungstate scintillation crystals for the CMS electromagnetic calorimeter

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply of 26 000 lead-tungstate scintillation crystals for the barrel part of the CMS Electromagnetic Calorimeter (ECAL). Following a CERN market survey (MS-2727/EP/CMS) carried out among seven firms in four Member States and two firms in two non-Member States, the Eidgenössische Technische Hochschule in Z rich (ETHZ) published on 15 February 2001 an open call for tenders and, in addition, invited tenders from four firms in two non-Member States, including the two firms identified in the CERN market survey. By the closing date, the ETHZ had received one bid from a firm in a CERN Member State and three bids from three firms in two non-Member States. The Finance Committee is invited to agree to the negotiation of a contract to be placed by CERN, on behalf of the ETHZ, with the lowest bidder, SCIONIX (NL), for the supply of 26 000 lead-tungstate crystals for the barrel part of the CMS ECAL for a total amount of 9 392 000 US dollars (16 060 320 Swiss francs)...

  11. Proposal for the Award of a Contract for the Supply of 18kV Power Transformers Rated 464 kVA to 2 MVA

    CERN Document Server

    2002-01-01

    This document concerns the award of a contract for the supply of thirty-five 18 kV cast-resin rectifier power transformers rated 464 kVA to 2 MVA and 26 protective enclosures. Following a market survey (MS-2920/SL/LHC) carried out among 56 firms in sixteen Member States, a call for tenders (IT-3007/SL/LHC) was sent on 12 August 2002 to eight firms in five Member States. By the closing date, CERN had received three tenders from three firms in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with TRASFOR (CH), the lowest bidder, for the supply of 35 power transformers rated 464 kVA to 2 MVA and 26 protective enclosures for a total amount of 1 398 500 Swiss francs, not subject to revision, with an option for three additional transformers and protective enclosures, for an additional amount of 107 650 Swiss francs, subject to revision for inflation from 1 January 2005, bringing the total amount to 1 506 150 Swiss francs subject to revision for inflation from 1 January...

  12. Proposal for the award of a contract for the supply of low-carbon steel sheets for the mqw quadrupole magnets

    CERN Document Server

    1999-01-01

    This document concerns the award of a contract for the supply of 1000 tonnes of low-carbon steel sheets for the MQW quadrupole magnets. Following a market survey carried out among 53 firms in 16 Member States, a call for tenders (IT-2619/SL/LHC) was sent on 24 September 1999 to three firms in two Member States. By the closing date, CERN had received two tenders. The Finance Committee is invited to agree to the negotiation of a contract with COCKERILL-SAMBRE (BE) for the supply of 1000 tonnes of low-carbon steel sheets for the MQW quadrupole magnets for a total amount of 894 780 euros (1 423 870 Swiss francs), subject to revision for contractual deliveries after 31 December 2001, with an option for the supply of up to 200 tonnes of additional low-carbon steel sheets, for a total amount of 178 956 euros (284 774 Swiss francs), subject to revision for contractual deliveries after 31 December 2001, bringing the total amount to a maximum of 1 073 736 euros (1 708 644 Swiss francs). The above amounts in Swiss franc...

  13. Proposal for the award of a contract for the supply of hollow copper conductors for the coils of the mqw quadrupole magnets

    CERN Document Server

    1999-01-01

    This document concerns the award of a contract for the supply of up to 105 500 kilogrammes of hollow copper conductors, of two different dimensions, for the MQW quadrupole magnets. Following a market survey carried out among 30 firms in 13 Member States and one firm in Japan, a call for tenders (IT-2620/SL/LHC) was sent on 24 September 1999 to three firms in two Member States. By the closing date, CERN had received two tenders. The Finance Committee is invited to agree to the negotiation of a contract with the firm OUTOKUMPU PORICOPPER (FI) for the supply of 105 500 kilogrammes of hollow copper conductors, of two different dimensions, for the MQW quadrupole magnets for a total amount of 1 024 932 Swiss francs, subject to revision for contractual deliveries after 31 December 2001, with an option for the supply of up to 10 550 kilogrammes of additional hollow copper conductors, of two different dimensions, for a total amount of 102 493 Swiss francs, subject to revision for contractual deliveries after 31 Decemb...

  14. Proposal for the award of a contract for the supply of the external cryogenic sub-system for the magnets of the ATLAS experiment

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply, including design, installation, commissioning and testing at CERN of the external cryogenic sub-system for the magnets of the ATLAS experiment. Following a market survey carried out among 28 firms in eight Member States and eight firms in two non-Member States, a call for tenders (IT-2807/EP/ATLAS) was sent on 17 August 2000 to two firms in two Member States. By the closing date, CERN had received tenders from the two firms. The Finance Committee is invited to agree to the negotiation of a contract with LINDE KRYOTECHNIK (CH), the lowest bidder, for the design, supply, installation, commissioning and testing at CERN of the external cryogenic sub-system for the magnets of the ATLAS experiment for a total amount of 6 652 000 Swiss francs, not subject to revision, with options for interconnecting low- and high-pressure warm piping and for spare parts, for an additional amount of 910 170 Swiss francs, not subject to revision, bringing the total amount...

  15. Proposal for the award of a contract for the supply of glass-fibre reinforced epoxy support posts for the LHC cryomagnets

    CERN Document Server

    2000-01-01

    This document concerns the award of a contract for the supply of glass-fibre reinforced epoxy support posts for the LHC cryomagnets. Following a market survey carried out among 114 firms in sixteen Member States, a call for tenders (IT-2596/LHC/LHC) was sent on 14 August 2000 to 11 firms and a consortium consisting of two firms, in seven Member States. By the closing date, CERN had received four tenders from three firms and a consortium, in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with EADS CASA ESPACIO (ES), the lowest bidder complying with the specifications, for the supply of 3750 cryodipole and 872 short straight section support posts for a total amount of 6 455 739 euros (9 747 454 Swiss francs), not subject to revision until 1 January 2003, with options for up to 300 support posts of each type, for an additional amount of 637 000 euros (961 800 Swiss francs), not subject to revision until 1 January 2003, bringing the total amount to 7 092 738 euros ...

  16. Proposal for the award of a contract for the supply of a supervisory control and data acquisition system for the four LHC experiments

    CERN Document Server

    2000-01-01

    This document concerns the award of a contract for the supply of a Supervisory Control and Data Acquisition (SCADA) system for the control of the four LHC experiments. Following a market survey carried out among 63 firms in thirteen Member States and one firm in Israel, a call for tenders (IT-2814/IT) was sent on 29 May 2000 to two firms and two consortia, each consisting of two firms, in four Member States. By the closing date, CERN had received four tenders from three firms and one consortium in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with ETM (AT), the lowest bidder complying with the specification, for the supply of a Supervisory Control and Data Acquisition (SCADA) system for the control of the four LHC experiments, including consultancy services and training, for a total amount of 407 500 euros (634 000 Swiss francs), not subject to revision, and 10 years? maintenance for a total amount of 308 500 euros (480 000 Swiss francs), subject to annual rev...

  17. Proposal for the award of two contracts for the supply of fine-blanked austenitic steel collars for the cold masses of the LHC superconducting dipole magnets

    CERN Document Server

    1999-01-01

    This document concerns the award of two contracts for the supply of 12 500 000 fine-blanked austenitic steel collars in three different shapes and of two different types for the cold masses of the LHC superconducting dipole magnets. Following a market survey carried out among 70 firms in fourteen Member States and one firm in Japan, a call for tenders (IT-2469/LHC/LHC) was sent on 3 June 1999 to eleven firms in five Member States and one firm in Japan. By the closing date, CERN had received five tenders. The Finance Committee is invited to agree to the negotiation of two contracts with: - MALVESTITI (IT) for the supply of up to 7 812 500 fine-blanked austenitic steel collars, which represents 5/8 of the total quantity required for the cold masses of the LHC superconducting dipole magnets, for a total amount of up to 6 908 509 Swiss francs, subject to revision for contractual deliveries after 31 December 2001, with an option for the supply of up to 4 687 500 additional fine-blanked austenitic steel collars, wh...

  18. Proposal for the award of a contract for the supply of polyimide film for cable and ground insulation of the LHC superconducting magnets

    CERN Document Server

    1999-01-01

    This document concerns the award of a contract for the supply of up to 79 tonnes of polyimide film, of three different types, for cable and ground insulation of the LHC superconducting magnets. A call for tenders (IT-2679/LHC/LHC) was sent on 21 September 1999 to two firms in Japan and one firm in the USA. By the closing date, CERN had received three tenders. The Finance Committee is invited to agree to the negotiation of a contract with the firm KANEKA (JP), the lowest bidder, for the supply of 79 tonnes of polyimide film of three different types for an amount of 5 425 541 USD (8 123 284 Swiss francs) for the polyimide film produced in the USA, not subject to revision, and 725 726 546 Japanese yen (10 109 020 Swiss francs) for the polyimide film produced in Japan, not subject to revision, with an option for the supply of up to 20% additional polyimide film of each type, for an amount of 1 085 108 USD (1 624 657 Swiss francs) and 145 145 309 Japanese yen (2 021 804 Swiss francs) respectively, not subject to r...

  19. Proposal for the award of a contract for the supply and installation of the cryogenic helium refrigeration system for the CMS experiment

    CERN Document Server

    1999-01-01

    This document concerns the award of a contract for the supply and installation of the cryogenic helium refrigeration system for the CMS Experiment. Following a market survey carried out among 22 firms in seven Member States and seven firms in two non-Member States, a call for tenders (IT-2576/EP/CMS) was sent on 17 February 1999 to two firms in two Member States and one firm in one non-Member State. By the closing date, CERN had received two tenders. The Finance Committee is invited to agree to the negotiation of a contract with AIR LIQUIDE (FR), the lowest bidder, for the supply and installation of a cryogenic helium refrigeration system for an amount of 4 552 500 euros, subject to revision, with an option for one liquid nitrogen dewar and a one-year extension of the warranty period, for an amount of 205 000 euros, subject to revision, bringing the total amount to 4 757 500 euros. At the rate of exchange given in the tender, this amount is equal to 7 612 000 Swiss francs. This procurement will be financed by...

  20. Proposal for the award of a contract for the supply, testing, installation and commissioning of the proximity cryogenic system for the ATLAS toroid magnet system

    CERN Document Server

    European Organization for Nuclear Research

    2002-01-01

    This document concerns the award of a contract for the supply, testing, installation and commissioning of the proximity cryogenic system for the ATLAS toroid magnet system. Following a market survey carried out among 61 firms in ten Member States and 14 firms in three non-Member States, a call for tenders (IT-2624/EP/ATLAS) was sent on 19 April 2002 to four firms and three consortia in six Member States and two firms in one non-Member State. By the closing date, CERN had received three tenders. The Finance Committee is invited to agree to the negotiation of a contract with AIR LIQUIDE ITALIA (IT), the lowest bidder, for the supply, testing, installation and commissioning of the proximity cryogenic system for the ATLAS toroid magnet system for a total amount not exceeding 2 840 000 euros (4 191 300 Swiss francs), not subject to revision. The rate of exchange which has been used is that stipulated in the tender. This procurement will be financed by the ATLAS Common Fund and CERN's contribution will not exceed 8...

  1. Proposal for the award of a contract for the design, supply, installation, commissioning and testing at CERN of eight helium dryer units for the LHC

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the design, supply, installation, commissioning and testing at CERN of eight helium dryer units for the LHC. Following a market survey carried out among 42 firms in ten Member States, a call for tenders (IT-2722/LHC/LHC) was sent on 10 August 2000 to seven firms and three consortia, consisting of two firms each, in seven Member States. By the closing date, CERN had received five tenders from three firms and two consortia in five Member States. The Finance Committee is invited to agree to the negotiation of a contract with the firm COSMI (IT), the lowest bidder fulfilling the technical requirements, for the design, supply, installation, commissioning and testing at CERN of eight helium dryer units for a total amount of 3 514 779 euros, (5 307 329 Swiss francs), not subject to revision, with options for additional equipment for heating the adsorber bed and additional heat exchanger/condenser equipment, for an additional amount of 80 081 euros (120 923 Swiss fra...

  2. Proposal for the award of a contract for the supply of low-carbon steel sheets for LHC resistive dipole magnets

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply of 1 106 tonnes of low-carbon steel sheets for the MBW, MBXW and MCBW resistive dipole magnets for the LHC. Following a market survey (MS-2619/SL/LHC) carried out among 62 firms in sixteen Member States, a call for tenders (IT-2911/SL/LHC) was sent on 6 March 2001 to 11 firms in seven Member States. By the closing date, CERN had received one tender. The Finance Committee is invited to agree to the negotiation of a contract with the firm COCKERILL SAMBRE (BE), the only bidder, for the supply of 1 106 tonnes of low-carbon steel sheets for the MBW, MBXW and MCBW resistive dipole magnets for a total amount of 984 803 euros (1 511 328 Swiss francs), not subject to revision until 1 January 2003, with an option for the supply of up to 15% additional steel sheets, for a total amount of 147 720 euros (226 699 Swiss francs), not subject to revision until 1 January 2003, bringing the total amount to a maximum of 1 132 523 euros (1 738 027 Swiss francs), not s...

  3. Proposal for the award of a contract for the supply of superconducting cables for the LHC low-current insertion (mqm) and wide-aperture insertion (mqy) quadrupoles

    CERN Document Server

    1999-01-01

    This document concerns the award of a contract for the supply of the superconducting cables for the LHC low-current insertion (MQM) and wide-aperture insertion (MQY) quadrupoles. A call for tenders (IT-2631/LHC/LHC) was sent to four firms in four Member States, three firms in Japan and two firms in the USA on 3 June 1999. By the closing date, CERN had received seven tenders. The Finance Committee is invited to agree to the negotiation of a contract with the firm VACUUMSCHMELZE (DE) for the supply of all superconducting cables for the LHC MQM and MQY quadrupoles for a total net price of 3 240 257 euros, subject to revision after 31 December 2000, with an option to procure additional cables representing 10% of the initial quantity for a total net price of 324 026 euros, bringing the total to an amount of 3 564 283 euros, subject to revision after 31 December 2000. At the exchange rate given in the tender, these amounts correspond to 5 192 720 Swiss francs, 519 272 Swiss francs and 5 711 992 Swiss francs respect...

  4. Proposal for the award of a blanket contract for automatic air-sampling systems for fire and gas detection in the LHC experiments

    CERN Document Server

    2004-01-01

    This document concerns the award of a blanket contract for automatic air-sampling systems for fire and gas detection in the LHC experiments. Following a market survey carried out among 119 firms in ten Member States, a call for tenders (IT-2891/ST) was sent on 1 August 2003 to four firms, in three Member States. By the closing date, CERN had received two tenders from one firm and one consortium, in three Member States. The Finance Committee is invited to agree to the negotiation of a blanket contract with ICARE (FR), the lowest bidder, for the supply of automatic air-sampling systems for fire and gas detection in the LHC experiments for a total amount not exceeding 1 750 000 euros (2 714 000 Swiss francs), subject to revision for inflation from 1 January 2007 with options for air-sampling smoke detection systems for electrical racks, for an additional amount of 400 000 euros (620 000 Swiss francs), subject to revision for inflation from 1 January 2007, bringing the total amount to a maximum of 2 150 000 euros...

  5. Proposal for the Award of a Contract for the Supply of 40 Broadband Transistorised RF 200 W Amplifiers for the LHC Transverse Damper System

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the supply of 40 broadband transistorised RF 200 W amplifiers for the LHC transverse damper system. Following a market survey carried out among 30 firms in twelve Member States, a call for tenders (IT-3171/SL/LHC) was sent on 20 February 2003 to five firms in four Member States. By the closing date, CERN had received two tenders from two firms in two Member States. The Finance Committee is invited to agree to the negotiation of a contract with THALES (BE), the lowest bidder complying with the specification, for the supply of 40 broadband transistorised RF 200 W amplifiers for the LHC transverse damper system for a total amount of 1 044 819 euros (1 563 049 Swiss francs), not subject to revision, with an option for an additional 20 broadband transistorised RF amplifiers, for an additional amount of 305 740 euros (457 387 Swiss francs), subject to revision for inflation from 1 July 2005, bringing the total amount to a maximum of 1 350 559 euros (2 020 436 Swiss...

  6. Unsaturated consolidation theory for the prediction of long-term municipal solid waste landfill settlement.

    Science.gov (United States)

    Liu, Chia-Nan; Chen, Rong-Her; Chen, Kuo-Sheng

    2006-02-01

    The understanding of long-term landfill settlement is important for landfill design and rehabilitation. However, suitable models that can consider both the mechanical and biodecomposition mechanisms in predicting the long-term landfill settlement are generally not available. In this paper, a model based on unsaturated consolidation theory and considering the biodegradation process is introduced to simulate the landfill settlement behaviour. The details of problem formulations and the derivation of the solution for the formulated differential equation of gas pressure are presented. A step-by-step analytical procedure employing this approach for estimating settlement is proposed. The proposed model can generally model the typical features of short-term and long-term behaviour. The proposed model also yields results that are comparable with the field measurements.

  7. Analysis of the Legal Effect of Settlement Agreements Prepared in Medical Litigation Following Plastic Surgery in Korea

    Directory of Open Access Journals (Sweden)

    Jung Woo Kwon

    2017-07-01

    Full Text Available Background Settlements between doctors and patients provide a solution to complicated disputes. However, some disputes may be renewed as a result of negligence by both parties. The purpose of this study was to review the legal issues that may potentially arise during the preparation of settlement agreements and to propose a list of requirements for ensuring the effectiveness of these settlement agreements. Methods Data from 287 civil cases concerning aesthetic surgery that took place between 2000 and 2015 were collected from a court database in South Korea. Factors that influenced the effectiveness of settlement agreements were analyzed. Results Among the 287 court precedents, there were 68 cases of covenant not to sue. Eighteen cases were dismissed because the settlement agreements were recognized as effective, and 50 cases were sent forward for judgment on their merits because the agreements were not recognized as effective. The types of surgery and types of complications were classified by frequency. We evaluated the geographical distribution of the precedents, the settlement timing, and the effectiveness and economic impact of the settlements. We found that there was no statistically significant relationship among these factors. Four major factors that made a settlement agreement legally effective were identified, and the data showed that fee-free reoperations were not considered by the court in determining the compensation amount. Conclusions When preparing a settlement agreement, it is advisable to review the contents of the agreement rather than to take the preparation of a settlement agreement per se to be legally meaningful.

  8. MUTUAL CONCESSIONS - SPECIFIC ELEMENT OF THE COMPROMISE/TRANSACTION CONTRACT

    Directory of Open Access Journals (Sweden)

    Georgeta-Bianca Spîrchez

    2012-11-01

    Full Text Available Given the usefulness and practical importance of the compromise contract conclusion and of the amicably dispute resolution, within the business world, we aim to analyze, in what follows, the concrete means by which these kind of settlement are achieved. Two questions become legitimate in the context of concerns about mutual concessions which the parties make in a compromise contract. These questions are the following: “What are the mutual concessions? Do mutual concessions mean equivalent concessions?” and “How mutual concessions are required to complete a valid settlement? Is the requirement of mutual concessions grounded?”

  9. Geoportal as a way for monitoring land settlements

    Directory of Open Access Journals (Sweden)

    Наталя Бубир

    2016-10-01

    Full Text Available The use of geoportals will improve land monitoring through timely detection of changes in land conditions, mobility access to geospatial data. The result of cadastre geoportals analysis of leading countries, including France, Germany, Great Britain, Austria, USA, Canada, has indicated that their content is correlated to cadastre features in one country and often do not contain complex issues of land monitoring settlements. In Ukraine, there is no public online mapping resource of this topic. It is proposed to establish specialized geoportal monitoring land settlements for public use. The geoportal contents should include an interactive map of each settlement, text information about settlements, laws and regulations, data about existing land use, including land-use violations and carried out or planned environmental activities. An important component of this portal is a personal user panel (Personal office, where he can view, save, print information that is of interest to him, including application forms to the local land management. On this basis we have developed a geoportal monitoring land settlements of Stepnogorsk village council within the student’s research work as part of the relevant geoportals in Zaporizhzhia region. The portal main menu includes: Settlements of Zaporizhzhia region; Monitoring land settlements; Land environmental; Virtual Tour; News. Additional menu contains five tabs: Home (go to home page geoportals; laws; Maps; Photo Gallery; Personal office. Interactive maps of settlements are based on Google maps. Map content includes mapping settlement’s functional areas and distribution of adverse natural and anthropogenic processes. The main map’s advantage is active zone, clicking on which the user is able to see which process is unfavorable in the territory, and which intended purpose is in this land. The user can also edit the map by his personal office. Overall, portal development within student

  10. Water Loss in Small Settlements

    OpenAIRE

    Mindaugas Rimeika; Anželika Jurkienė

    2014-01-01

    The main performance indicators of a water supply system include the quality and safety of water, continuous work, relevant pressure and small water loss. The majority of foreign and local projects on reducing water loss have been carried out in the water supply systems of metropolitans; however, the specificity of small settlements differs from that of big cities. Differences can be observed not only in the development of infrastructure and technical indicators but also in the features of wa...

  11. Settlement characteristics of major infrastructures in Shanghai

    Directory of Open Access Journals (Sweden)

    X. Jiao

    2015-11-01

    Full Text Available Critical infrastructures in Shanghai have undergone uneven settlement since their operation, which plays an important role in affecting the security of Shanghai. This paper, taking rail transportation as example, investigates settlement characteristics and influencing factors of this linear engineering, based on long-term settlement monitoring data. Results show that rail settlement is related to geological conditions, regional ground subsidence, surrounding construction activities and structural differences in the rail systems. In order to effectively decrease the impact of regional ground subsidence, a monitoring and early-warning mechanism for critical infrastructure is established by the administrative department and engineering operators, including monitoring network construction, settlement monitoring, information sharing, settlement warning, and so on.

  12. Problems and Alternatives of Settlement Lagoons for Mine Water Treatment System

    Science.gov (United States)

    Lee, Dong-Kil

    2015-04-01

    A field test and computational flow analysis were conducted to identify the structural problems with existing settlement lagoons and to propose effective alternatives. When it comes to existing settlement lagoons without any specifically designed internal structure, mine water flows along a specific route while other regions remained stagnant. Such a flow pattern along a specific region causes a significant reduction in retention time as well as the ineffective use of the space in a settlement lagoon. When applying the modified settlement lagoon design proposed in this study, the flow distribution of mine drainage became uniform and the time taken for mine drainage to reach the outlet was improved by as much as 360 times and the exchange efficiency was significantly enhanced from 14.5% to 82.7%.

  13. 26 CFR 301.6224(c)-3 - Consistent settlements.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 18 2010-04-01 2010-04-01 false Consistent settlements. 301.6224(c)-3 Section... settlements. (a) In general. If the Internal Revenue Service enters into a settlement agreement with any..., settlement terms consistent with those contained in the settlement agreement entered into. (b) Requirements...

  14. Proposal to negotiate, without competitive tendering, a contract for the manufacture, testing and delivery of 320 cryogenic helium mass flowmeters for the LHC

    CERN Document Server

    2001-01-01

    This document concerns the manufacture, testing and delivery of 320 cryogenic helium mass flowmeters for the LHC. Following a market survey (MS-2602/LHC/LHC) carried out amoung 37 firms in twelve Member States and six firms in two non-Member States, a price enquiry for qualifying prototypes was sent on 20 November 1998 to nine selected firms and the received prototypes were evaluated. As a result of this process a request for quotation was sent to one firm The Finance Committee is invited to agree to the negotiation of a contract with the firm EMERSON PROCESS MANAGEMENT/FISHER-ROSEMOUNT (CH), without competitive tendering, for the manufacture, testing and delivery of 320 cryogenic helium mass flowmeters for an amount of 1 804 840 Swiss francs, not subject to revision, with options for up to 10 additional cryogenic helium mass flowmeters and an extension of the guarantee period to five years for all units for an amount of 219 090 Swiss francs, not subject to revision, bringing the total amount to 2 023 930 Swi...

  15. Contract Renewal Information - all Contracts

    Data.gov (United States)

    Department of Housing and Urban Development — Multifamily Portfolio datasets (section 8 contracts) - The information has been compiled from multiple data sources within FHA or its contractors. HUD oversees more...

  16. Unfair contract terms in B2C contracts

    NARCIS (Netherlands)

    Hesselink, M.W.; Loos, M.B.M.

    2012-01-01

    Because of its textual similarity to the Unfair Terms Directive 1993, Chapter 8 of the proposed CESL, on ‘Unfair contract terms’, can benefit from two decades of interpretative experience which is likely to provide a comparably high degree of instant legal certainty to contracting parties.

  17. Contract theory and EU Contract Law

    OpenAIRE

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories are largely irreconcilable with the contract law of the EU. The paper further addresses the main implications of this mismatch, both for contract theory and for EU contract law. It suggests that in...

  18. 75 FR 23679 - Order Finding That the ICE Malin Financial Basis Contract Traded on the IntercontinentalExchange...

    Science.gov (United States)

    2010-05-04

    ... rights over IPI's bidweek price indices. As a result, no other exchange can offer such a basis contract... since ICE has the right to the IPI index for cash settlement purposes. In addition, ICE sells its price... right to base its settlement on the IPI Malin Index price. While the Commission acknowledges that there...

  19. Agile Contracts

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Pries-Heje, Lene

    2014-01-01

    with “endless” re-negotiation of the requirements; you need a more flexible way to develop IS. A new way of coping with many changes is to use an agile development approach and a fixed budget and resources contract. This paper presents an example case. We analyse the case and design a guideline for how......When you have stable and non-ambiguous requirements then a classic contract for IS between a supplier and a public sector institution based on a requirements specification may be well suited. However, if you have to accept many changes or have ambiguous requirements then you may end up...... to implement a fixed budget and resources contract in the public sector. The guideline includes elements to cope with challenges in a tender process such as transparency, criteria for supplier selection, and live assessment of resource skills and capabilities, as well as achieving the flexibility for change...

  20. Turnkey contracts

    International Nuclear Information System (INIS)

    Langetepe, G.

    1977-01-01

    To make energy available economically and in sufficient quantity is a main point for the future of an industrial and more for a developing country. The investment costs and the availability of a power plant and in particular for a nuclear power plant are the most significant factors in the economic operation of the plant. In the phase before signing the contract the essential decisions are made with high influence in the economic operation and the availability of the plant. A turn-key contract offers good possibilities to minimize the risks referring a) the plant quality and functionality, b) the plant investment cost, c) the plant completion date, d) the handling of the licensing procedures, e) the availability of the operation. The lecture mentions the points which are of high influence for a successful erection and operation period and which must be clarified before signing the contract between the buyer and supplier of the plant. (orig./HP) [de

  1. Livelihoods of squatter settlements : analysis from tenure perspective

    NARCIS (Netherlands)

    Shrestha, Ashokkumar; Nepali, Purna; Panday, U.S.; Shrestha, Reshma

    2017-01-01

    Squatter settlements are inevitable in most of the urban areas. Livelihood situation of squatter settlements seem poor, vulnerable and miserable. Living condition in these settlements suffered from overcrowding, inadequate accommodation, limited access to clean water and sanitation, lack of proper

  2. NATURE-RURAL SETTLEMENT INTERACTIONS

    Directory of Open Access Journals (Sweden)

    Zehra Eminağaoğlu

    2006-04-01

    Full Text Available Conservation and management of natural environments are generally brought up upon adverse developments against nature in the humannature interactions. Although individual actions are often considered to be more immediate innatıre-related issuesi ecologic problems tend to spread in time and lead to reginol or even global problems. For this reason, it stands imperative that economic, ecologic and aesthetic values of the environment we live in be protected and used sustainably. Being the scene of nature and the environment landscape signifies the whole with living and nonliving entities where we live in. Dameged and destroyed landscape scenes particularly in urban areas necessitaites the reconsideration of human-nature relations and nature-frendly life style. This study investigates the rural settlements that show harmony with nature and reflects qualities of natural environments on the dwellings. Particularly, with the examples of drawing and pictures it examines the associatiation of rural settlements with nature as well as the use of the green as an occasional or spacial element.

  3. 7 CFR 1427.172 - Settlement.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Settlement. 1427.172 Section 1427.172 Agriculture Regulations of the Department of Agriculture (Continued) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS COTTON Recourse Seed Cotton Loans § 1427.172 Settlement. (a...

  4. 5 CFR 838.135 - Settlements.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Settlements. 838.135 Section 838.135 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) COURT... § 838.135 Settlements. (a) OPM must comply with the terms of a properly filed court order acceptable for...

  5. 42 CFR 402.17 - Settlement.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Settlement. 402.17 Section 402.17 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CIVIL MONEY PENALTIES, ASSESSMENTS, AND EXCLUSIONS General Provisions § 402.17 Settlement. CMS or OIG has...

  6. 45 CFR 150.413 - Settlement.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Settlement. 150.413 Section 150.413 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES REQUIREMENTS RELATING TO HEALTH CARE ACCESS CMS ENFORCEMENT IN GROUP AND INDIVIDUAL INSURANCE MARKETS Administrative Hearings § 150.413 Settlement. CMS has exclusive...

  7. 42 CFR 1003.126 - Settlement.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Settlement. 1003.126 Section 1003.126 Public Health OFFICE OF INSPECTOR GENERAL-HEALTH CARE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OIG AUTHORITIES CIVIL MONEY PENALTIES, ASSESSMENTS AND EXCLUSIONS § 1003.126 Settlement. The Inspector General has exclusive...

  8. 20 CFR 498.126 - Settlement.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Settlement. 498.126 Section 498.126 Employees' Benefits SOCIAL SECURITY ADMINISTRATION CIVIL MONETARY PENALTIES, ASSESSMENTS AND RECOMMENDED EXCLUSIONS § 498.126 Settlement. The Inspector General has exclusive authority to settle any issues or case...

  9. 5 CFR 838.1018 - Settlements.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Settlements. 838.1018 Section 838.1018 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) COURT... Settlements. The former spouse may request that an amount be withheld from the retirement benefits that is...

  10. Internalization, Clearing and Settlement, and Liquidity

    NARCIS (Netherlands)

    Degryse, H.A.; van Achter, M.; Wuyts, G.

    2012-01-01

    Abstract: We study the relation between liquidity in financial markets and post-trading fees (i.e. clearing and settlement fees). The clearing and settlement agent (CSD) faces different marginal costs for different types of transactions. Costs are lower for an internalized transaction, i.e. when

  11. Improving settlement type classification of aerial images

    CSIR Research Space (South Africa)

    Mdakane, L

    2014-10-01

    Full Text Available , an automated method can be used to help identify human settlements in a fixed, repeatable and timely manner. The main contribution of this work is to improve generalisation on settlement type classification of aerial imagery. Images acquired at different dates...

  12. 48 CFR 915.305 - Proposal evaluation.

    Science.gov (United States)

    2010-10-01

    ... AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Source Selection 915.305 Proposal evaluation. (d... personnel will be required to comply with DOE conflict of interest and nondisclosure requirements. ...

  13. 48 CFR 1515.606-70 - Contracting methods.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contracting methods. 1515... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 1515.606-70 Contracting methods. The Department of Housing and Urban Development-Independent Agencies Appropriation Act...

  14. Amending Contracts for Choreographies

    Directory of Open Access Journals (Sweden)

    Laura Bocchi

    2011-07-01

    Full Text Available Distributed interactions can be suitably designed in terms of choreographies. Such abstractions can be thought of as global descriptions of the coordination of several distributed parties. Global assertions define contracts for choreographies by annotating multiparty session types with logical formulae to validate the content of the exchanged messages. The introduction of such constraints is a critical design issue as it may be hard to specify contracts that allow each party to be able to progress without violating the contract. In this paper, we propose three methods that automatically correct inconsistent global assertions. The methods are compared by discussing their applicability and the relationships between the amended global assertions and the original (inconsistent ones.

  15. Settlement mechanism of piled-raft foundation due to cyclic train loads and its countermeasure

    Science.gov (United States)

    Gu, Linlin; Ye, Guanlin; Wang, Zhen; Ling, Xianzhang; Zhang, Feng

    2017-07-01

    In this paper, numerical simulation with soil-water coupling finite element-finite difference (FE-FD) analysis is conducted to investigate the settlement and the excess pore water pressure (EPWP) of a piled-raft foundation due to cyclic high-speed (speed: 300km/h) train loading. To demonstrate the performance of this numerical simulation, the settlement and EPWP in the ground under the train loading within one month was calculated and confirmed by monitoring data, which shows that the change of the settlement and EPWP can be simulated well on the whole. In order to ensure the safety of train operation, countermeasure by the fracturing grouting is proposed. Two cases are analyzed, namely, grouting in No-4 softest layer and No-9 pile bearing layer respectively. It is found that fracturing grouting in the pile bearing layer (No-9 layer) has better effect on reducing the settlement.

  16. Analyzing Capacity Withholding in Oligopoly Electricity Markets Considering Forward Contracts and Demand Elasticity

    Directory of Open Access Journals (Sweden)

    S. Salarkheili

    2011-12-01

    Full Text Available In this paper capacity withholding in an oligopolistic electricity market that all Generation Companies (GenCos bid in a Cournot model is analyzed and the capacity withheld index, the capacity distortion index and the price distortion index are obtained and formulated. Then a new index, Distortion-Withheld Index (DWI, is proposed in order to measure the potential ability of market for capacity withholding. In these indices the impact of demand elasticity on capacity withholding is considered and it is shown that demand elasticity plays an important role for capacity withholding and market power mitigation. Due to the significant role of forward contracts for market power mitigation and risk hedging in power markets, the impacts of these contracts on capacity withholding are considered. The effects of GenCos’ strategic forward contracts on capacity withholding are also discussed. Moreover, the relationship between capacity withholding of GenCos and market price distortion is acquired. A two-settlement market including a forward market and a spot market is used to describe GenCos’ strategic forward contracting and spot market competition.

  17. Commuting in the settlement system of Serbia

    Directory of Open Access Journals (Sweden)

    Lukić Vesna

    2011-01-01

    Full Text Available Territorial organization of settlement system is the framework for internal migration flows. The purpose of this paper is to consider the relation between commuting and the settlement structure. Commuting patterns and characteristics of commuters in Serbia are relatively unknown and insufficiently researched, and as such, can not be adequately used in creation of development strategies and public policies which would include commuters' issues. It has been emphasized the importance of research of commuting ties between different settlements and also pointed out in which way commuting flows could be researched and analyzed by using existing sources, due to better understanding of connections between migrations and settlements. Commuting patterns of workers in Serbia and interrelations between the scope and the structure of commuting flows, as well as the type and population size of settlements in Serbia have been examined. Apart from territorial dimension of commuting phenomenon, socio-economic component of commuting population has also been considered. The use of costumised tabulations from 2002 Census have enabled us to examine all types of commuting and emphasise dominant directions of commuting flows of economically active population according to gender, level of education and sector of economic activity, within the settlement hierarchy. Workers have been classified into seven groups according to place of residence and place of work. The findings reveal there is a clear connection between the hierarchy structure and commuting patterns in Serbia. Further, we find some evidence that only 9,5% of workers - commuters have been working in the settlement of the same population size and type such as their residing settlement. Commuting flows within Serbia’s settlement system point out to certain variations when looking at individual categories of population, but it can be concluded that there is general trend of commuting "upwards" within the

  18. Working Group Reports and Presentations: Mars Settlement and Society

    Science.gov (United States)

    McKay, Chris

    2006-01-01

    The long-term implications of space exploration must be considered early in the process. With this in mind, the Mars Settlement and Society Group focused on five key areas: Philosophical Framework, Community Infrastructure and Government, Creating Stakeholders, Human Subsystems, and Habitat Design. The team proposes long and short term goals to support getting to and then staying long-term on Mars. All objectives shared the theme that they should engage, inspire, and educate the public with the intent of fostering stakeholders in the exploration of Mars. The objectives of long-term settlement on Mars should not neglect group dynamics, issues of reproduction, and a strong philosophical framework for the establishment of a society.

  19. INDEFINITE CONTRACT REVIEW 2000

    CERN Multimedia

    Division des ressources humaines

    2000-01-01

    The Director-General has decided to review staff members in professional categories 2 to 5 satisfying the criteria for consideration for the award of an indefinite contract, in accordance with Article R II 1.20 of the Staff Regulations. Staff members holding a fixed-term contract which it has been decided not to renew will not be considered. The following stages are foreseen:1.\tCandidates qualifying for review in accordance with Article R II 1.20 of the Staff Regulations and the Administrative Circular N° 9 will be contacted by Human Resources Division. 2.\tThe criteria as to when staff members qualify for review are described in Administrative Circular N° 9. These include the following:staff members who are in their fourth year of service on a fixed-term contract;in addition, for staff members having three years or more of previous relevant service in the Organization on a contract of limited duration (or term-contract) and upon proposal by the division leader concerned, consid...

  20. INDEFINITE CONTRACT REVIEW 2001

    CERN Multimedia

    Human Resources Division

    2001-01-01

    The Director-General has decided to review staff members in professional categories 2 to 5 satisfying the criteria for consideration for the award of an indefinite contract, in accordance with Article R II 1.20 of the Staff Regulations. Staff members holding a fixed-term contract which it has been decided not to renew will not be considered. The following stages are foreseen: 1. Candidates qualifying for review in accordance with Article R II 1.20 of the Staff Regulations and the Administrative Circular N° 9 will be contacted by Human Resources Division. 2. The criteria as to when staff members qualify for review are described in Administrative Circular N° 9. These include the following: staff members who are in their fourth year of service on a fixed-term contract; in addition, for staff members having three years or more of previous relevant service in the Organization on a contract of limited duration (or term-contract) and upon proposal by the division leader concerned, consideration fo...

  1. Draft and final Supplemental Environmental Impact Report for the proposed renewal of the contract between the United States Department of Energy and the Regents of the University of California for operation and management of the Lawrence berkeley Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    This Supplemental Environmental Impact Report (SEIR) has been prepared in conformance with the California Environmental Quality Act (CEQA) and the University of California Procedures for the Implementation of CEQA (UC Procedures) to evaluate the potential environmental impacts associated with the University of California`s operation of the Lawrence Berkeley Laboratory (LBL) for the next five years. The specific project under consideration in this SEIR is the renewal of a five-year contract between the University and the United States Department of Energy (DOE) to manage and operate the Lawrence Berkeley Laboratory. As the California agency responsible for carrying out the proposed project, the University is the lead agency responsible for CEQA compliance. Environmental impacts, mitigation, and a site overview are presented.

  2. Draft and final Supplemental Environmental Impact Report for the proposed renewal of the contract between the United States Department of Energy and the Regents of the University of California for operation and management of the Lawrence berkeley Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    This Supplemental Environmental Impact Report (SEIR) has been prepared in conformance with the California Environmental Quality Act (CEQA) and the University of California Procedures for the Implementation of CEQA (UC Procedures) to evaluate the potential environmental impacts associated with the University of California's operation of the Lawrence Berkeley Laboratory (LBL) for the next five years. The specific project under consideration in this SEIR is the renewal of a five-year contract between the University and the United States Department of Energy (DOE) to manage and operate the Lawrence Berkeley Laboratory. As the California agency responsible for carrying out the proposed project, the University is the lead agency responsible for CEQA compliance. Environmental impacts, mitigation, and a site overview are presented.

  3. Contract theory and EU Contract Law

    NARCIS (Netherlands)

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories

  4. Proposal for a resolution of the Council on establishing new regulations on chapter VI ''supply'' of the contract on the foundation of the European Atomic Community

    International Nuclear Information System (INIS)

    1983-01-01

    The nuclear fuel cycle industry of the Community has been fully developed new and established a structure which facilitates the application of marketing rules to the initiatives of the economic subjects with regard to nuclear materials supply. For this reason the Community is no longer dependent of interventionistic mechanisms like the monopoly and the confrontation of supply and demand. Still the market for nuclear materials shall be characterized by numerous interventions of public authorities also in the future. Indeed there is a risk that the nuclear materials trade, in the absence of a common discipline, is made subject to always more numerous one-sided fuctual constraints and also such constraints which are in complete opposition to the regular and impartial supply of all consumers of the Community as well as to the existence of the common nuclear market. The present proposal tries to cope with that risk. It aims at keeping nuclear materials supply compatible with the protection of common interests. (orig./HSCH) [de

  5. Decontamination strategies in contaminated settlement

    International Nuclear Information System (INIS)

    Hubert, P.; Jouve, A.; Tallec, V. Le

    1996-01-01

    Six years after the Chernobyl accident, decontamination actions had been completed in many places, the contamination could be considered as fixed, especially on urban surfaces and the social situation was felt to be stabilized. Under those conditions the efficiency of the 'classical' decontamination techniques was under question, it was worthwhile to look at new specific techniques. Besides it was necessary to discuss the interest of new decontamination actions in settlements. The European Union (EU) sponsored a project ECP 4 in order to look at the opportunities for further dose reduction actions in the contaminated territories of the three republics affected by the accident. The objective was to provide a local decision maker, faced with many alternatives for decontamination, with all the elements for determining what to do according to the various objectives he might pursue. The main results are presented here. (author)

  6. Muscle Contraction.

    Science.gov (United States)

    Sweeney, H Lee; Hammers, David W

    2018-02-01

    SUMMARYMuscle cells are designed to generate force and movement. There are three types of mammalian muscles-skeletal, cardiac, and smooth. Skeletal muscles are attached to bones and move them relative to each other. Cardiac muscle comprises the heart, which pumps blood through the vasculature. Skeletal and cardiac muscles are known as striated muscles, because the filaments of actin and myosin that power their contraction are organized into repeating arrays, called sarcomeres, that have a striated microscopic appearance. Smooth muscle does not contain sarcomeres but uses the contraction of filaments of actin and myosin to constrict blood vessels and move the contents of hollow organs in the body. Here, we review the principal molecular organization of the three types of muscle and their contractile regulation through signaling mechanisms and discuss their major structural and functional similarities that hint at the possible evolutionary relationships between the cell types. Copyright © 2018 Cold Spring Harbor Laboratory Press; all rights reserved.

  7. Analysis causes of the incidence and compare social, economic, physical characteristics of informal settlements, case study: city of Marivan in Kurdistan province

    OpenAIRE

    Veisi, Farzad

    2015-01-01

    Informal settlements are one of the problems of urban management in developing countries. Various theories about the causes and management of these settlements have been proposed. The most important of these theories, new socialist, liberal and dependency can be noted. The theory that argues for mandatory clearing informal settlement is not logical. Empowerment approach to be interested by countries and international organizations, and successful examples of this approach, with emphasis on th...

  8. The process of negotiating settlements at FERC

    International Nuclear Information System (INIS)

    Littlechild, Stephen

    2012-01-01

    Interstate gas pipelines and their customers presently settle about 90% of the rate cases set for hearing before the Federal Energy Regulatory Commission (FERC). The conventional regulatory litigation process is now only an occasional means of dispute resolution. This paper explains the settlement process, illustrating with the 12 section 4 rate cases brought by pipelines from 2008 and 2009. The paper also discusses and illustrates why parties prefer settlement to litigation, what difference it makes, which cases tend to settle, what might account for the increasing frequency of settlements over time, the recent phenomenon of pre-filing settlements and the recent settlement of section 5 cases brought by FERC. In contrast to many other regulatory jurisdictions, FERC Trial Staff play an active role in facilitating negotiation and settlement. They make an initial analysis 3 months after a pipeline files for a tariff rate increase. Thereafter, the regulatory aim is to bring the parties into agreement, not to determine an outcome and impose it upon them. This is a different role for the regulatory body than was previously apparent. - Highlights: ► About 90% of FERC rate cases are settled, not litigated. ► FERC Trial Staff play an active role in facilitating negotiation and settlement. ► Conventional regulation is now only an occasional means of dispute resolution. ► The paper also discusses which cases settle and what difference it makes.

  9. Biological challenges of true space settlement

    Science.gov (United States)

    Mankins, John C.; Mankins, Willa M.; Walter, Helen

    2018-05-01

    "Space Settlements" - i.e., permanent human communities beyond Earth's biosphere - have been discussed within the space advocacy community since the 1970s. Now, with the end of the International Space Station (ISS) program fast approaching (planned for 2024-2025) and the advent of low cost Earth-to-orbit (ETO) transportation in the near future, the concept is coming once more into mainstream. Considerable attention has been focused on various issues associated with the engineering and human health considerations of space settlement such as artificial gravity and radiation shielding. However, relatively little attention has been given to the biological implications of a self-sufficient space settlement. Three fundamental questions are explored in this paper: (1) what are the biological "foundations" of truly self-sufficient space settlements in the foreseeable future, (2) what is the minimum scale for such self-sustaining human settlements, and (3) what are the integrated biologically-driven system requirements for such settlements? The paper examines briefly the implications of the answers to these questions in relevant potential settings (including free space, the Moon and Mars). Finally, this paper suggests relevant directions for future research and development in order for such space settlements to become viable in the future.

  10. Contraction theorems in fuzzy metric space

    International Nuclear Information System (INIS)

    Farnoosh, R.; Aghajani, A.; Azhdari, P.

    2009-01-01

    In this paper, the results on fuzzy contractive mapping proposed by Dorel Mihet will be proved for B-contraction and C-contraction in the case of George and Veeramani fuzzy metric space. The existence of fixed point with weaker conditions will be proved; that is, instead of the convergence of subsequence, p-convergence of subsequence is used.

  11. The Proposed Tobacco Settlement: Issues from a Federal Perspective

    National Research Council Canada - National Science Library

    Antos, Joseph

    1998-01-01

    Last year, representatives of five major tobacco companies and a group of state attorneys general reached an agreement that, if enacted, could dramatically change the ways in which tobacco is marketed...

  12. 48 CFR 715.305 - Proposal evaluation.

    Science.gov (United States)

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Source Selection 715.305 Proposal evaluation... perceive no actual or potential conflict of interests. (An acceptable certification appears under ADS...

  13. Work and minor work contracts

    CERN Document Server

    1999-01-01

    The Work and Minor Work contracts are all of the result-oriented type. The work is specified by CERN and the contractor is given full responsibility for its performance. The contracts are thus very similar to supply contracts. The re-tendering of the existing contracts is almost complete, except for some building maintenance contracts. A new cycle of re-tendering for some activities will be launched in the next twelve months. The total estimated expenditure in the year 2000 for the contracts referred to in this document is 27 750 000 Swiss francs at 1999 prices. The Finance Committee is invited: - to approve the proposed expenditure for the extension of contracts for which the estimated amount for the year 2000 exceeds 750 000 Swiss francs, namely those under references 1, 2, 3, 5, 7, 8, 9 and 23, highlighted in Table I; - to take note that all Work and Minor Work contracts have been tendered since 1 January 1994, except the small contracts shown under references 12 and 16 in Table I; - to take note that the ...

  14. Measurement of Narora reactor building relative settlement

    International Nuclear Information System (INIS)

    Deo, P.M.; Pande, K.C.; Patwardhan, H.S.

    1977-01-01

    The civil construction of the reactor building of Narora Atomic Power Project has a special problem. The stability of the structure is liable to settlement as this location falls in seismic zone. To obviate the possibility of large scale unequal settlements, the reactor building is founded on a 4 meter thick rigid raft concreted in three layers, at a depth of 13 meters below ground. Stainless steel tanks will be embedded at 17 locations to measure relative settlements. The relative elevation difference will be detected by electrical probes when the water level in any one of the tanks touches the tip of the probes. The design envisages a maximum permissible unequal settlements of about 10 mm. over a period of 20 years. (K.B.)

  15. Choreography Synthesis as Contract Agreement

    Directory of Open Access Journals (Sweden)

    Julien Lange

    2013-10-01

    Full Text Available We propose a formal model for distributed systems, where each participant advertises its requirements and obligations as behavioural contracts, and where multiparty sessions are started when a set of contracts allows to synthesise a choreography. Our framework is based on the CO2 calculus for contract-oriented computing, and borrows concepts and results from the session type literature. It supports sessions where the number of participants is not determined beforehand, and keeps CO2's ability to rule out participants that are culpable if contracts are not fulfilled at runtime. We show that we have progress and session fidelity in CO2, as a result of the honesty of participants — i.e., their ability to always adhere to their contracts.

  16. Do cues matter? Highly inductive settlement cues don't ensure high post-settlement survival in sea urchin aquaculture.

    Directory of Open Access Journals (Sweden)

    Benjamin Mos

    Full Text Available Increasing settlement and post-settlement survival during the critical transition from planktonic larvae to benthic juveniles will increase efficiency for sea urchin aquaculture. This study investigated the effects of temperature and settlement cues on the settlement and post-settlement survival of the sea urchin Tripneustes gratilla during this phase. The current commercial methodology, which utilises natural biofilm settlement plates, was tested and resulted in low settlement (90% than a natural biofilm (∼25%. The addition of macroalgae-conditioned seawater to natural biofilm significantly increased settlement rates (>85%. Mixed consortia and single strains of bacteria isolated from macroalgae, biofilms and adult conspecifics all induced significant settlement, but at significantly lower rates than macroalgae. No evidence was found that higher rates of settlement to bacteria on macroalgae were generated by a cofactor from the macroalgae. Age of bacterial cultures, culturing bacteria on solid and liquid media and concentration of nutrients in cultures had little effect on settlement rates. Finally, macroalgae-conditioned seawater combined with natural biofilm settlement plates induced significantly higher settlement than to the biofilm plates alone in a commercial scale trial. However, high post-settlement mortality resulted in equivalent survival between treatments after 25 days. This study highlights that settlement studies should extend to post-settlement survival, which remains poor for T. gratilla and is a significant obstacle to increasing efficiency for aquaculture.

  17. Structural behaviour of masonry arch with no-horizontal springing settlement

    Directory of Open Access Journals (Sweden)

    P. Zampieri

    2018-01-01

    Full Text Available This paper presents a calculation procedure for assessing the structural integrity of a masonry arch with non-horizontal springing settlement. By applying the Principle of Virtual Work (PVW to the deformed arch system, the procedure proposed herein details the reaction forces and thrust lines for each step of imposed settlement of the support. The procedure can also be used estimate the final displacement that causes complete failure of arch structural capacity. The results of the analysis procedure were compared against those obtained by experimental testing so as to validate the proposed calculation method

  18. MOBILE GIS: A TOOL FOR INFORMAL SETTLEMENT OCCUPANCY AUDIT TO IMPROVE INTEGRATED HUMAN SETTLEMENT IMPLEMENTATION IN EKURHULENI, SOUTH AFRICA

    Directory of Open Access Journals (Sweden)

    B. T. Mokoena

    2016-06-01

    Full Text Available Upgrading and relocating people in informal settlements requires consistent commitment, good strategies and systems so as to improve the lives of those who live in them. In South Africa, in order to allocate subsidised housing to beneficiaries of an informal settlement, beneficiary administration needs to be completed to determine the number of people who qualify for a subsidised house. Conventional methods of occupancy audits are often unreliable, cumbersome and non-spatial. Accordingly, this study proposes the use of mobile GIS to conduct these audits to provide up-to-date, accurate, comprehensive and real-time data so as to facilitate the development of integrated human settlements. An occupancy audit was subsequently completed for one of the communities in the Ekurhuleni municipality, Gauteng province, using web-based mobile GIS as a solution to providing smart information through evidence based decision making. Fieldworkers accessed the off-line capturing module on a mobile device recording GPS coordinates, socio-economic information and photographs. The results of this audit indicated that only 56.86% of the households residing within the community could potentially benefit from receiving a subsidised house. Integrated residential development, which includes fully and partially subsidised housing, serviced stands and some fully bonded housing opportunities, would then be key to adequately providing access to suitable housing options within a project in a post-colonial South Africa, creating new post-1994 neighbourhoods, in line with policy. The use of mobile GIS therefore needs to be extended to other informal settlement upgrading projects in South Africa.

  19. Dispersed and decentralised settlement system

    Directory of Open Access Journals (Sweden)

    Andrej Černe

    2004-01-01

    Full Text Available In the process of reintegration of the urban system new settlements are emerging on theurban rim, transitional zones are reurbanised, derelict areas within the cities are being developedand degraded urban areas of derelict industrial complexes are being renaturalised. Inthe periphery combined research and production parks are being set up, in the open landscapeintegrated business, trade and recreational centres are springing up. Decentralisationand recentralisation of focal points of development accompany the contemporary processesof reurbanisation and suburbanisation – they are simultaneous and move in two-direction i.e. to and from the city. We understand them as manifestation of a dynamic balance amongcontradiction existing between the centre and the rim. Deindustrialisation and relocation ofproduction and distribution from the centres of gravity to the periphery generate extensivedegraded urban areas within cities and between the city and suburbs. The periphery is beingurbanised with the creation of new, dispersed and nonhierachical poles of development, andthe city and inner city is undergoing reurbanization. The general environmental conditionsin the city and in the countryside are being equalised, the potentials of development arebeing sought in the comparative advantages of local conditions: be it attractive urban districts,be it suburban entities or countryside areas.

  20. Types of contracts and contracting procedures

    International Nuclear Information System (INIS)

    Zijl, N.A. van

    1977-01-01

    Contracting for a nuclear power plant can be carried out in many different ways, from a bilateral agreement between two countries to an international open bidding competition. Also the kind of contracts (turnkey, split-package or multi-contract type) are discussed with their pros and cons as well as the contracting procedures which can be followed to come to the conclusion of a contract. (orig.) [de

  1. The morphological / settlement pattern classification of South African settlements based on a settlement catchment approach, to inform facility allocation or service delivery

    CSIR Research Space (South Africa)

    Sogoni, Zukisa

    2016-07-01

    Full Text Available , it is of the utmost importance that a critical evaluation of settlement structure and patterns is undertaken to directly inform the manner in which social services are delivered in different settlement types....

  2. African Countries and WTO´s Dispute Settlement Mechanism

    DEFF Research Database (Denmark)

    Alavi, Amin

    2007-01-01

    The WTO Dispute Settlement Mechanism was designed, inter alia, to secure the 'rule of law' within international trade and provide all members with opportunities to exercise their rights under multilateral trade agreements. But, after ten years, no sub-Saharan African country has yet used the option...... to initiate a dispute. This article examines what prevents the WTO Africa Group from using the system and critically reviews the solutions they have proposed to remedy this. It concludes by discussing how this reflects broader problems concerning African participation in WTO, and puts forward some alternative...

  3. 75 FR 23710 - Order Finding That the ICE PG&E Citygate Financial Basis Contract Traded on the...

    Science.gov (United States)

    2010-05-04

    ... ICE maintains exclusive rights over IPI's bidweek price indices. As a result, no other exchange can... this contract has the exclusive right to base its settlement on the IPI PG&E Citygate Index price... Contract Traded on the IntercontinentalExchange, Inc., Performs a Significant Price Discovery Function...

  4. Reforming Investor–State Dispute Settlement: A (Comparative and International) Constitutional Law Framework

    NARCIS (Netherlands)

    Schill, S.W.

    As a result of the steep increase in investment arbitrations, and the problems this has brought to the fore, many reform efforts in international investment law focus on changes to investor–state dispute settlement (ISDS). Reform proposals, however, diverge widely (ranging from exiting the system

  5. Framework for Structuring Procurement Contracts

    Directory of Open Access Journals (Sweden)

    Lena Borg

    2014-12-01

    Full Text Available The aim of this paper is to propose a new framework for structuring contract types and payment methods. Concerning procurement contracts, the first important new feature of this framework is a stepwise structure with three main steps in the contract design: (1 what will be procured—should the contract only include construction, or should it include both construction and operation/maintenance (2 who will do the detailed design of the premise and (3 how many contractors will the client use? The second important new feature of this framework is that both step 2 and step 3 include a continuum of alternatives. Concerning payment methods, the new framework is primarily based on how the specific risks of the project are shared. These frameworks can be useful for policy formulation in that they can help to avoid some problematic ways of formulating policies.

  6. Local and sustainable development without government settlement at Conquista/MS: a case of study

    Directory of Open Access Journals (Sweden)

    Moisés da Silva Martins

    2016-12-01

    Full Text Available The present work, through a case study of the Settlement Conquest in Campo Grande / MS, aims to demonstrate the fragility of settlements in the face of economic and social development. Settlers face cultural dogmas and no administrative management, basic guidelines for managing their own business, cannot achieve a family or community quality of life. Government programs and projects are not adhered to as planned, as there are delays in funding and technical follow-up. Simultaneously, the study proposes alternative crops and a line of action in the path of cooperativism, for local and sustainable development, supporting the tripod of social responsibility with economic and cultural growth.

  7. Proposal for the award of a contract for the design, supply, installation and commissioning of a ventilation and air conditioning system for the ECN3 experimental area and the TCC8 and GHN300 service tunnels and for the dismantling of the existing system

    CERN Document Server

    2014-01-01

    Proposal for the award of a contract for the design, supply, installation and commissioning of a ventilation and air conditioning system for the ECN3 experimental area and the TCC8 and GHN300 service tunnels and for the dismantling of the existing system

  8. Proposal to negotiate an amendment to an existing contract for the supply of four additional low-noise Thyristor-Controlled Reactor coils for a new Static VAR Compensator on the 18 kV electrical network on the Meyrin site

    CERN Document Server

    2017-01-01

    Proposal to negotiate an amendment to an existing contract for the supply of four additional low-noise Thyristor-Controlled Reactor coils for a new Static VAR Compensator on the 18 kV electrical network on the Meyrin site

  9. 48 CFR 15.307 - Proposal revisions.

    Science.gov (United States)

    2010-10-01

    ... AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Source Selection 15.307 Proposal revisions. (a) If an... allow proposal revisions to clarify and document understandings reached during negotiations. At the... submit a final proposal revision. The contracting officer is required to establish a common cut-off date...

  10. Planning urban settlements for quality of life

    DEFF Research Database (Denmark)

    Boje Groth, N.; Hansen, K.E.; Björnberg, U.

    Notatet er et indlæg på den Europæiske Økonomiske Kommissions (ECE) konference om by- og regionforskning, tema II: "Research on the Quality of Life in Urban Settlements, Warszawa, maj 1976. I notatet opstilles en begrebsramme for livskvalitetsbegrebet, og man diskuterer hvorledes livskvalitetsana......Notatet er et indlæg på den Europæiske Økonomiske Kommissions (ECE) konference om by- og regionforskning, tema II: "Research on the Quality of Life in Urban Settlements, Warszawa, maj 1976. I notatet opstilles en begrebsramme for livskvalitetsbegrebet, og man diskuterer hvorledes...

  11. 75 FR 73145 - Self-Regulatory Organizations; NYSE Arca, Inc.; Notice of Filing of Proposed Rule Change Relating...

    Science.gov (United States)

    2010-11-29

    ... generally accepted accounting principles in the United States, consistently applied under the accrual method of accounting. The closing prices and settlement prices of VIX Futures Contracts are also readily...

  12. Human Resources Department: report on the settlement of disputes and discipline

    CERN Multimedia

    HR Department

    2016-01-01

    The 2015 Annual Report from the Human Resources Department concerning the settlement of disputes and discipline under Chapter VI of the Staff Rules and Regulations.   Introduction The 2015 Annual Report under Chapter VI (“Settlement of Disputes and Discipline”) of the Staff Rules and Regulations serves to report: cases of submission of requests for review; internal appeals; complaints before the Administrative Tribunal of the International Labour Organization (ILOAT); and cases in which disciplinary action was taken. Requests for Review and Internal Appeals Under Article S VI 1.01 of the Staff Rules, members of the personnel may challenge an administrative decision by the Director-General where it adversely affects the conditions of employment or association that derive from their contract or from the Staff Rules and Regulations. If permitted by the Staff Rules and Regulations, a decision may be challenged internally within the Organization: through a review procedure; or ...

  13. An economic assessment of patent settlements in the pharmaceutical industry.

    Science.gov (United States)

    Dickey, Bret; Orszag, Jonathan; Tyson, Laura

    2010-01-01

    This article demonstrates that in recent years, patent settlements between branded and generic manufacturers involving "reverse payments" from branded manufacturers to generic manufacturers have received close antitrust scrutiny, driven by concerns that such settlements harm consumers by delaying the entry of lower-priced generic drugs. The authors note that such settlements will be a focus of the Obama Administration's antitrust enforcement policy, yet there is a growing consensus among the courts that such settlements are anticompetitive only under narrow sets of circumstances. In this article, the authors present an analytical framework for evaluating the competitive effects of patent settlements, including those involving reverse payments, and demonstrate that these settlements can benefit consumers. Thus, the authors conclude that while continued scrutiny of such settlements is important, broad brush treatments are inappropriate and only a more individualized evaluation can correctly determine the competitive effects of a particular settlement agreement.

  14. The Settlements Growth in Mijen District, Suburb of Semarang

    Science.gov (United States)

    Pigawati, B.; Yuliastuti, N.; Mardiansjah, F. H.

    2018-02-01

    Semarang is one of metropolitan cities in Indonesia. As common in metropolitan cities, Semarang has problems regarding the availability of urban space, especially for settlements. This is related to the increase of population in Semarang. The selection of settlements should consider the suitability of space usage. This study aimed to analyze the growth of Semarang settlements in 2006-2015, distribution patterns, characteristics, directions and factors affecting growth. The location of the research is Mijen District located in Suburb of Semarang. This research used a quantitative descriptive spatial approach by using remote sensing technique and Geographic Information System (GIS). The results showed that some of the growth sites of settlements in Mijen District, the suburb of Semarang are located in areas which not suitable for settlements. There are several types of settlement patterns in Mijen District. Accessibility is the major factor driving the growth of settlements. An integrated development policy is needed to maintain a sustainable balance of urban settlement development.

  15. Development of a Common Nordic Balance Settlement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-02-15

    NordREG finds it essential for the customers that a common integrated end-user electricity market is developed and that all end-users are able to take part in the Nordic market. A common Nordic balance settlement is one important part of such a change. However, attention has to be paid to the comments that a badly designed common system is worse than well-designed national systems. It is thus important that the change to a common balance settlement is so thoroughly investigated that the common system gives a basis for a well-functioning market. An important basis for such a change is an agreed vision for the process: The present different systems for balance settlement shall by the year 2010 be replaced by a common Nordic balance settlement. This means that: It will be possible for a supplier to sell to the whole Nordic market from one legal entity and using only one system for customer management and reporting. The common Nordic balance settlement will be designed in such a way that it contributes to a well functioning market. This means for example that it will be attractive even for small suppliers and some end-users to be balance responsible parties. It is feasible that the first phase is focused on those present differences that are most decisive for fulfilment of the vision. NordREG recommends that the following issues shall be discussed and agreed in co-operation between NordREG, Nordel and relevant stakeholders in the first phase: The definition shall include how the common Nordic balance settlement shall interact with the balance control and the balance regulation of the interconnected power system and the balance settlement between countries performed by the TSOs. The definition should include the cost-base for common Nordic balance settlement in relation to other system responsibility costs. The core activities of system responsibility have also been analyzed by NordREG. It is important to find a balance between inter alia the need for simplicity and the

  16. Development of a Common Nordic Balance Settlement

    International Nuclear Information System (INIS)

    2006-02-01

    NordREG finds it essential for the customers that a common integrated end-user electricity market is developed and that all end-users are able to take part in the Nordic market. A common Nordic balance settlement is one important part of such a change. However, attention has to be paid to the comments that a badly designed common system is worse than well-designed national systems. It is thus important that the change to a common balance settlement is so thoroughly investigated that the common system gives a basis for a well-functioning market. An important basis for such a change is an agreed vision for the process: The present different systems for balance settlement shall by the year 2010 be replaced by a common Nordic balance settlement. This means that: It will be possible for a supplier to sell to the whole Nordic market from one legal entity and using only one system for customer management and reporting. The common Nordic balance settlement will be designed in such a way that it contributes to a well functioning market. This means for example that it will be attractive even for small suppliers and some end-users to be balance responsible parties. It is feasible that the first phase is focused on those present differences that are most decisive for fulfilment of the vision. NordREG recommends that the following issues shall be discussed and agreed in co-operation between NordREG, Nordel and relevant stakeholders in the first phase: The definition shall include how the common Nordic balance settlement shall interact with the balance control and the balance regulation of the interconnected power system and the balance settlement between countries performed by the TSOs. The definition should include the cost-base for common Nordic balance settlement in relation to other system responsibility costs. The core activities of system responsibility have also been analyzed by NordREG. It is important to find a balance between inter alia the need for simplicity and the

  17. The urban features of informal settlements in Jakarta, Indonesia

    Directory of Open Access Journals (Sweden)

    Waleed Alzamil

    2017-12-01

    Full Text Available This data article contains the urban features of three informal settlements in Jakarta: A. Kampung Bandan; B. Kampung Luar Batang; And C. Kampung Muara Baru. The data describes the urban features of physical structures, infrastructures, and public services. These data include maps showing locations of these settlements, photography of urban status, and examples of urban fabric. The data are obtained from the statistical records and field surveys of three settlements cases. Keywords: Informal settlements, Physical, Features, Urban, Kampung, Jakarta, Indonesia

  18. 7 CFR 1940.406 - Real estate settlement procedures.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Real estate settlement procedures. 1940.406 Section... AGRICULTURE (CONTINUED) PROGRAM REGULATIONS (CONTINUED) GENERAL Truth in Lending-Real Estate Settlement Procedures § 1940.406 Real estate settlement procedures. (a) General. This section provides the instructions...

  19. Infrastructure Provision and Classification of Rural Settlements in ...

    African Journals Online (AJOL)

    This study classifies the selected rural settlements on the basis of available infrastructure .To achieve this aim, 22 rural settlements were randomly selected. The cluster analysis was applied on the data in order to group the rural settlements on the basis of their infrastructure profiles. Thus the hierarchical method of cluster ...

  20. 6 CFR 13.46 - Compromise or settlement.

    Science.gov (United States)

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Compromise or settlement. 13.46 Section 13.46 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY PROGRAM FRAUD CIVIL REMEDIES § 13.46 Compromise or settlement. (a) Parties may Make offers of compromise or settlement at any time...

  1. 24 CFR 3500.9 - Reproduction of settlement statements.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Reproduction of settlement... HOUSING AND URBAN DEVELOPMENT REAL ESTATE SETTLEMENT PROCEDURES ACT § 3500.9 Reproduction of settlement... in sections F and H, respectively. (3) Reproduction of the HUD-1 must conform to the terminology...

  2. A trace-based model for multiparty contracts

    DEFF Research Database (Denmark)

    Hvitved, Tom; Klaedtke, Felix; Zălinescu, Eugen

    2012-01-01

    In this article we present a model for multiparty contracts in which contract conformance is defned abstractly as a property on traces. A key feature of our model is blame assignment, which means that for a given contract, every breach is attributed to a set of parties. We show that blame...... assignment is compositional by de¿ning contract conjunction and contract disjunction. Moreover, to specify real-world contracts, we introduce the contract speci¿cation language CSL with an operational semantics. We show that each CSL contract has a counterpart in our trace-based model and from...... the operational semantics we derive a run-time monitor. CSL overcomes limitations of previously proposed formalisms for specifying contracts by supporting: (history sensitive and conditional) commitments, parametrised contract templates, relative and absolute temporal constraints, potentially in¿nite contracts...

  3. Bound to treatment: the Ulysses contract.

    Science.gov (United States)

    Dresser, R

    1984-06-01

    Several commentators have proposed a novel legal mechanism, the "Ulysses contract" or "voluntary commitment contract," to permit mental patients with recurrent treatable disorders to consent in advance to treatment which they might reject at a time when their cognitive abilities are impaired. Dresser discusses the legal ramifications of precommitment, the implications of basing consent on a patient's past rather than current wishes, problems of enforcing Ulysses contracts given the uncertainties of psychiatric diagnosis, and the inherent paternalism of these precommitment agreements.

  4. Researching Entrepreneurship in Low-income Settlements

    DEFF Research Database (Denmark)

    Gough, Katherine V.; Langevang, Thilde; Namatovu, Rebecca

    2014-01-01

    of entrepreneurship conducted in a low-income settlement, which combined participatory quantitative and qualitative approaches, highlighting the strengths and challenges of using participatory methods. The paper demonstrates how drawing on a range of participatory methods can contribute to creating more engaging...

  5. Clearing and settlement of exchange traded derivatives

    OpenAIRE

    John McPartland

    2009-01-01

    Derivatives are a class of financial instruments that derive their value from some underlying commodity, security, index, or other asset. Futures and options are common forms of derivatives. This article explains how clearing and settlement systems for exchange traded derivatives work.

  6. Directional layouts in central lowland Maya settlement

    DEFF Research Database (Denmark)

    Bevan, Andrew; Jobbová, Eva; Helmke, Christophe

    2013-01-01

    This paper suggests the existence of non-random, directional patterns in the location of housemounds across the Late Classic Maya settlement landscape at Baking Pot, Belize, and then explores the wider implications of this patterning in the central Maya lowlands. It introduces an anisotropic method...

  7. Between archaeology and anthropology: imagining Neolithic settlements

    Czech Academy of Sciences Publication Activity Database

    Květina, Petr; Hrnčíř, V.

    2013-01-01

    Roč. 51, č. 2 (2013), s. 323-347 ISSN 0323-1119. [Theory and method in the prehistoric archaeology of Central Europe. Mikulov, 24.10.2012-26.10.2012] R&D Projects: GA MK(CZ) DF12P01OVV032 Keywords : Neolithic longhouse * ethnographic analogy * settlement patterns Subject RIV: AC - Archeology, Anthropology, Ethnology

  8. 17 CFR 8.16 - Settlement offers.

    Science.gov (United States)

    2010-04-01

    ... Section 8.16 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION EXCHANGE PROCEDURES FOR DISCIPLINARY, SUMMARY, AND MEMBERSHIP DENIAL ACTIONS Disciplinary Procedure § 8.16 Settlement... the disciplinary committee at any time after the investigation report is completed. The disciplinary...

  9. Modelling of settlement induced building damage

    NARCIS (Netherlands)

    Giardina, G.

    2013-01-01

    This thesis focuses on the modelling of settlement induced damage to masonry buildings. In densely populated areas, the need for new space is nowadays producing a rapid increment of underground excavations. Due to the construction of new metro lines, tunnelling activity in urban areas is growing.

  10. Contracts in Public Administration

    Directory of Open Access Journals (Sweden)

    Agnieszka GRZESIOK-HOROSZ

    2011-03-01

    Full Text Available Objectives: The present makes a contribution to the discussion on contracts in administration under Polish law. It concentrates on theoretical issues, but ones of considerable practical significance. Prior Work though relatively poorly explored, field. This paper is a result of academic considerations on the classical institution of civil law, namely a bilateral juridical act significance of this area may be demonstrated by the fact that one scientific conference and a collection of papers have been devoted to contracts in administration. as research method, the analysis of jurisprudence and doctrinal writings referring to law currently in force. The paper discusses as well the draft of the administrative law, and includes comparative remarks. put forward certain comments pertainin legislation. The authors formulate as well outline theses interesting but complicated matters. As a voice in the doctrinal dispute it can als useful for law students. Value composition. Starting from gener the binding law and proposed amendments. The functioning in foreign countries and proposals of regulatory solutions.

  11. Population Ageing in Rural Settlements in the Republic of Croatia

    Directory of Open Access Journals (Sweden)

    Ivo Nejašmić

    2016-08-01

    points has a higher degree of ageing and vice versa. The rural population in Croatia scored 66.5 points, which means that it fell under the fourth type of ageing – very old age in 2011. The calculation for the urban population in Croatia yields 67.0 points, meaning that it also fell into the fourth type – very old age. The fact that the degree of rural population ageing almost equals that of the urban population is very significant. A mature post-transition phase in the change of the age structure has occurred in Croatia. It is marked by the contraction of the young group and expansion of the old one (it is a question of the advanced stage of demographic ageing, and the decrease in differences between functional population groups. In this way differences between urban and rural population disappear since they both are marked by an equal degree of ageing. This fact is particularly important in considering demographic stabilisation policy of rural areas. They cannot count on significant immigration from the city as the urban population itself “is suffering” from depopulation, natural decrease and demographic ageing. There are no big differences between Croatian counties as well; the majority is placed within the two classes. Rural population falls under the fourth type - very old age in fourteen counties, and in five under the type 5 – advanced old age. The least favourable situation is in the Lika-Senj County because its rural population is classified into the sixth type – very old advanced age. Only slightly poor situation is to be found in Međimurje County whose rural population falls under the third type – old age. Although the overall picture is more or less expected, the fact that in no less than 45% of administrative units (administrative cities and municipalities the population of rural settlements has been affected by a very high level of ageing, still astounds (types: 5 – advanced old age, 6 – very advanced old age and 7 – extremely advanced

  12. THE CULTURE OF SETTLEMENT AREAS IN SLOVENIA

    Directory of Open Access Journals (Sweden)

    Urša Suhadolnik Vovko

    2013-01-01

    Full Text Available To study and grasp the contemporary rural areas in Slovenia, the students of the Faculty of Architecture carried out a public opinion survey on the subject of the culture of settlement areas, with a particular reference to the visual image of the experiential space of the settlements. Today, human needs and living values are an integral part of all documents, as they represent the starting-point of designing new concepts of living. Personal quality of living is explained by Mandič [1999] through the use of Allard's classification of human needs; however, Mercer's Quality of Living ranking is often used to measure the quality of the living environmentThe paper represents the results of the study, which included two target groups: The experts in spatial management and planning employed at municipal administrative offices; and the senior years’ students at the Faculty of Architecture of the University of Ljubljana. The study represented here addressed the values of the living environment. The study was triggered by the 'colourfulness' that knows no limits in Slovenia. Putting the everyday indignation over the variety of all possible shades aside, it has become evident that the tiny elements that are also destroying the image of our settlements are all too often neglected: billboards, log cabins complementing garages and decorative elements, stalls during celebrations and fairs, fountains, monuments, mix of exotic plants, the Snow White and the Seven Dwarfs etc. The study included a survey to obtain a more objective approach to the studying of the quality from the viewpoints of the changing living culture and the use of communal external space in Slovenian settlements. The key question that resonated in most of other questions was: What would improve the quality of life in the settlement?

  13. METHODOLOGY RELATED TO ESTIMATION OF INVESTMENT APPEAL OF RURAL SETTLEMENTS

    Directory of Open Access Journals (Sweden)

    A. S. Voshev

    2010-03-01

    Full Text Available Conditions for production activity vary considerably from region to region, from area to area, from settlement to settlement. In this connection, investors are challenged to choose an optimum site for a new enterprise. To make the decision, investors follow such references as: investment potential and risk level; their interrelation determines investment appeal of a country, region, area, city or rural settlement. At present Russia faces a problem of «black boxes» represented by a lot of rural settlements. No effective and suitable techniques of quantitative estimation of investment potential, rural settlement risks and systems to make the given information accessible for potential investors exist until now.

  14. The morphological /settlement pattern classification of South African settlements based on a settlement catchment approach, to inform facility allocation and service delivery

    CSIR Research Space (South Africa)

    Sogoni, Z

    2016-07-01

    Full Text Available / settlement pattern classification of South African settlements based on a settlement catchment approach, to inform facility allocation and service delivery Zukisa Sogoni Planning Africa Conference 2016 4 July 2Project Focus and Background • CSIR... services. • Purpose is to support application & planning for new investment & prevent “unsustainable” investments / White elephants. 3Outputs • National set of service delivery catchments • Profile information per individual catchment • Ranking...

  15. 48 CFR 49.603-5 - Cost-reimbursement contracts-partial termination.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-reimbursement....603-5 Cost-reimbursement contracts—partial termination. [Insert the following in Block 14 of SF 30, Amendment of Solicitation/Modification of Contract, for settlement agreements for cost-reimbursement...

  16. Madrid principles of Nagorno-Karabakh settlement

    Directory of Open Access Journals (Sweden)

    K K Babayan

    2014-12-01

    Full Text Available As part of this work presents the analysis of the basic document and the legal framework of the peace settlement of the Nagorno-Karabakh conflict on the modern stage - «Madrid or Basic principles», presented to the sides of the negotiations at the OSCE ministerial conference in the Spanish capital Madrid in November 2007. The both side’s statements, international mediators and institutes form a legal background of the vector and the framework of the negotiation process. There are the fundamental differences and contradictions in the approaches of the sides of the negotiations to the «Basic principles» of the settlement in this article. The work contains a comparison of the various items and elements of the Madrid document both in relation to each other, and to the principles of international law.

  17. Spatial Analyses of Harappan Urban Settlements

    Directory of Open Access Journals (Sweden)

    Hirofumi Teramura

    2006-12-01

    Full Text Available The Harappan Civilization occupies a unique place among the early civilizations of the world with its well planned urban settlements, advanced handicraft and technology, religious and trade activities. Using a Geographical Information Systems (GIS, this study presents spatial analyses that locate urban settlements on a digital elevation model (DEM according to the three phases of early, mature and late. Understanding the relationship between the spatial distribution of Harappan sites and the change in some factors, such as topographic features, river passages or sea level changes, will lead to an understanding of the dynamism of this civilization. It will also afford a glimpse of the factors behind the formation, development, and decline of the Harappan Civilization.

  18. Research on the Starokuybyshevskoye Fortified Settlement

    Directory of Open Access Journals (Sweden)

    Gubaydullin Ayrat M.

    2012-06-01

    Full Text Available The Starokuybyshevskoye (Old-Kuybyshev fortified settlement is situated on the bank of the Bezdna river, 200 m to the northeast of Bolgar city. The site is being considerably eroded by the waters of the river and the Kuibyshev water reservoir. Currently it is situated on an island, under threat of complete destruction. In this regard, in 1946, 1987 and 1996, conservation and rescue excavations were conducted on the site. The detailed results of the 1996 studies are offered in the article. The ruins of an above-ground dwelling with an oven and three household pits were excavated. The ceramic assemblage of these structures has obvious features of the pre-Mongol Bulgar culture. In general, the findings make it possible to conclude that the settlement had existed only in the 11th through to the 13th century and that its collapse was associated with the Mongol invasion.

  19. Modern settlements in special needs education

    DEFF Research Database (Denmark)

    Ratner, Helene Gad

    2016-01-01

    . Settlements of this controversy govern whether the pupil or the educational institution becomes the main point of intervention. In Denmark, the particularities of settlements can be identified by juxtaposing the introduction of intelligence testing in the 1930s with the contemporary policy agenda of inclusion....... With intelligence testing, special needs education was to service children whose needs were seen as part of their human nature. Inclusion, in turn, assumes special needs to be stigmatizing cultural labels that need to be abandoned by changing school cultures. Drawing on actor-network theory we can approach......In the history of special needs education, the distinction between human nature and its social environment has been a controversial matter. The controversy regards whether special needs are primarily caused by the child's psycho-medical body or by cultural concepts of normality and deviance...

  20. COMPENSATORY INTEREST SETTLEMENT AND CREDIT BANKING MORATORIUM

    OpenAIRE

    Avelino Sánchez, Esteban Marino

    2014-01-01

    First is explained the reasons for this article, it mentions the specific legal rules that support the settlement of interest on the credit operations of companies in the financial system with end users, and then presents the average interest rates of some operations credit. Then we present the formula for calculating interest, and illustrates its application with examples 1 and 2 (the simplest). The following is, in examples 3 and 4, the calculation of interest with imputation of partial pay...

  1. 76 FR 8742 - Proposed Information Collection Activity; Comment Request

    Science.gov (United States)

    2011-02-15

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Administration for Children and Families Proposed... the Social Security Act (the Act) to authorize the Secretary, through the Federal Parent Locator... with information maintained by insurers (or their agents) concerning insurance claims, settlements...

  2. ADMINISTRATIVE CONTRACTS. DELIMITATIONS

    Directory of Open Access Journals (Sweden)

    Liana Teodora PASCARIU

    2016-12-01

    Full Text Available Article examines whether all contracts of public persons are administrative contracts; in other words, if the administration may conclude contracts that, according to their legal nature, are not administrative. If we start from the definition of administrative contracts as it appears in Law no. 554/2004, these include contracts by public authorities which concern the enhancement of public property execution of works of public interest, public services, public procurement and other administrative contracts provided by special laws and subject to the jurisdiction of the administrative courts.

  3. Historical topography of the Tsarev settlement site

    Directory of Open Access Journals (Sweden)

    Glukhov Aleksandr A.

    2014-06-01

    Full Text Available The topography of the Tsarev settlement site, one of major Golden Horde monuments in the Lower Volga region, is analyzed. The first descriptions of the settlement refer to the second half of the 18th century, while the initial large-scale excavations on the monument were conducted in the mid-19th century. By that time, the scientific community had adhered to the opinion that the ruins of Sarai (the city mainly associated with the Tsarev settlement site would stretch to a great distance from the Akhtuba river-head to Kolobovka village. The results of archaeological research of the 20th – early 21st century make it possible to challenge this view. To date, it is an established fact that the size of the actual urban area had constituted 5 x 2.2–2.3 km. The southern part of the city was occupied by the estates of the nobility, the central and northern parts were represented by trade and artisan quarters. Around the city, there were suburban cemeteries, including brick mausoleums (the ruins of which could be mistaken for the remains of dwellings in the 19th century, as well as the areas of irrigated agriculture.

  4. Mitigating Settlement of Structures founded on Peat

    Science.gov (United States)

    Wijeyesekera, D. C.; Numbikannu, L.; Ismail, T. N. H. T.; Bakar, I.

    2016-07-01

    Observations made of two common failures of structures founded on peat/organic soil in Johor, Malaysia is presented. Critical evaluation of current lightweight fill technology to mitigate such settlement is also discussed. Lightweight technology, such as Expanded Polystyrene (EPS), has been used in construction on soft yielding ground for decades. Regrettably, some published information of EPS failures to perform on construction sites are also cited in this paper. This paper outlines some concepts leading to the development of an alternative innovative lightweight fill is that the idealised cellular structure of the GCM permit free flow of water and complemented by the mat structure which evens out any differential settlement A further highlight of this paper is the monitoring of the field performance of this lightweight fill (GCM) as a feasible alternative to fill weight reduction on yielding ground.. Hence, a prime research objective was to compare the fill settlements observed with 1m high fill of surcharge loading on peat ground (comparison of the case of using a partial 0.6m high GCM and that of a total of 1m of conventional sand backfill).

  5. The Contracting Parties' Ability To Conclude The Employment Contract

    Directory of Open Access Journals (Sweden)

    Carmen Constantina NENU

    2014-08-01

    Full Text Available This study's main objective is to analyze certain effects produced by the changes of the Labor Code and by the entry into force of the current Romanian Civil Code. These effects refer to one of the fundamental conditions for the valid conclusion of the individual employment contract, that is, to the legal capacity of employers and employees. Thus, a complete analysis of legal regulations and of the correlations between different provisions on the legal capacity of parties to the individual employment contract is required to identify the existing noncompliance and to propose solutions. The research demonstrated that the current regulatory framework governing the legal capacity of the parties to an individual employment contract does not entirely correspond to the social reality. Therefore, only the employer benefits from a relatively comprehensive statutory regulation on the legal capacity to conclude an individual employment contract. The employee, however, does not benefit from the same attention from legislature. Considering the above, the study represents a significant scientific contribution, whose value lies in the proposed changes to modify legislature, so that the legal capacity of job holders would benefit from fair regulation, in accordance with the principle of legal protection of employee rights.

  6. Coral settlement on a highly disturbed equatorial reef system.

    Science.gov (United States)

    Bauman, Andrew G; Guest, James R; Dunshea, Glenn; Low, Jeffery; Todd, Peter A; Steinberg, Peter D

    2015-01-01

    Processes occurring early in the life stages of corals can greatly influence the demography of coral populations, and successful settlement of coral larvae that leads to recruitment is a critical life history stage for coral reef ecosystems. Although corals in Singapore persist in one the world's most anthropogenically impacted reef systems, our understanding of the role of coral settlement in the persistence of coral communities in Singapore remains limited. Spatial and temporal patterns of coral settlement were examined at 7 sites in the southern islands of Singapore, using settlement tiles deployed and collected every 3 months from 2011 to 2013. Settlement occurred year round, but varied significantly across time and space. Annual coral settlement was low (~54.72 spat m(-2) yr(-1)) relative to other equatorial regions, but there was evidence of temporal variation in settlement rates. Peak settlement occurred between March-May and September-November, coinciding with annual coral spawning periods (March-April and October), while the lowest settlement occurred from December-February during the northeast monsoon. A period of high settlement was also observed between June and August in the first year (2011/12), possibly due to some species spawning outside predicted spawning periods, larvae settling from other locations or extended larval settlement competency periods. Settlement rates varied significantly among sites, but spatial variation was relatively consistent between years, suggesting the strong effects of local coral assemblages or environmental conditions. Pocilloporidae were the most abundant coral spat (83.6%), while Poritidae comprised only 6% of the spat, and Acroporidae coral spat. These results indicate that current settlement patterns are reinforcing the local adult assemblage structure ('others'; i.e. sediment-tolerant coral taxa) in Singapore, but that the replenishment capacity of Singapore's reefs appears relatively constrained, which could lead

  7. Possible Applications of Photoautotrophic Biotechnologies at Lunar Settlements

    Science.gov (United States)

    McKay, David S.; Allen, Carl; Jones, J. A.; Bayless, D.; Brown, I.; Sarkisova, S.; Garrison, D.

    2007-01-01

    The most ambitious goal of the Vision of Space Exploration is to extend human presence across the solar system. Today, however, missions would have to bring all of the propellant, air, food, water, habitable volumes and shielding needed to sustain settlers beyond Earth. That is why resources for propellants, life support and construction of support systems and habitats must be found in space and utilized if humans hope to ever explore and colonize the solar system. The life support, fuel production and material processing systems currently proposed for spaceflight are essentially disconnected. Only traditional crop production has been proposed as a segment for bioregenerative life support systems, although the efficiency of higher plants for air regeneration is generally low. Thus, the investigation of air bioregeneration techniques based on the activity of photosynthetic organisms with higher rates of CO2 scrubbing and O2 release is very timely and important. Future systems for organic waste utilization in space may also benefit from the use of specific microorganisms. This janitorial job is efficiently carried out by microbes on Earth, which drive and connect different elemental cycles. It is likely that environmental control and life support systems based on bioregeneration will be capable of converting both organic and inorganic components of the waste at lunar settlements into edible biomass. The most challenging technologies for future lunar settlements are the extraction of elements (e.g. Fe, O, Si, etc) from local rocks for industrial feedstocks and the production of propellants. While such extraction can be accomplished by purely inorganic processes, the high energy requirements of such processes motivates the search for alternative technologies with lower energy requirements and appropriate efficiency. Well-developed terrestrial industrial biotechnologies for metals extraction and conversion could therefore be the prototypes for extraterrestrial

  8. Socio spatial adaptation as a resilience form of native unplanned settlement in confrontation with new planned settlement development pressure (case study: enclave native settlement in Serpong, Tangerang)

    Science.gov (United States)

    Ischak, Mohammad; Setioko, Bambang; Nurgandarum, Dedes

    2017-12-01

    Urban growth refers to expansion of a metropolitan into sub urban areas as the surrounding environment, with no exception of Jakarta city due to limited availability and high price of land within the city. The city of Jakarta, as a metropolitan, carries of expansion in its surrounding environment including Tangerang. Privat developers may an important role in this urban growth through their large scale of new settlement development project. The formation of establishment of enclave native unplanned sub urban settlement scattered within planned new settlement in Tangerang is to be an consequence of Jakarta urban growth. This fenomena could be comprehended as a form of resilience native settlement in confrontation with the new planned settlement pressure. The aim of this research, presented in this paper is to understand the socio-spatial concept of those enclave native settlement as an adaptation form to the new planned settlement pressure. Through descriptive qualitative research method, with indepth interview as a main research instrument, this research could depict or uncover the facts that there are various form of socio-spatial adaptation as the main theme of resilience native suburban settlement formation.

  9. Contractibility of curves

    Directory of Open Access Journals (Sweden)

    Janusz Charatonik

    1991-11-01

    Full Text Available Results concerning contractibility of curves (equivalently: of dendroids are collected and discussed in the paper. Interrelations tetween various conditions which are either sufficient or necessary for a curve to be contractible are studied.

  10. Larval vision contributes to gregarious settlement in barnacles: adult red fluorescence as a possible visual signal

    KAUST Repository

    Matsumura, K.

    2014-02-26

    Gregarious settlement, an essential behavior for many barnacle species that can only reproduce by mating with a nearby barnacle, has long been thought to rely on larval ability to recognize chemical signals from conspecifics during settlement. However, the cyprid, the settlement stage larva in barnacles, has one pair of compound eyes that appear only at the late nauplius VI and cyprid stages, but the function(s) of these eyes remains unknown. Here we show that cyprids of the intertidal barnacle Balanus (=Amphibalanus) amphitrite can locate adult barnacles even in the absence of chemical cues, and prefer to settle around them probably via larval sense of vision. We also show that the cyprids can discriminate color and preferred to settle on red surfaces. Moreover, we found that shells of adult B. amphitrite emit red auto-fluorescence and the adult extracts with the fluorescence as a visual signal attracted cyprid larvae to settle around it. We propose that the perception of specific visual signals can be involved in behavior of zooplankton including marine invertebrate larvae, and that barnacle auto-fluorescence may be a specific signal involved in gregarious larval settlement.

  11. Concept of contracting authority

    OpenAIRE

    Kasiliauskaitė, Vitalija

    2016-01-01

    Concept of Contracting Authority Law on Public Procurement the procurement concept implies the conclusion that public procurement be declared only such purchases are carried out by the contracting authority. The contracting authorities can be a subject of state and municipal management institutes, whose assignment authority is determined by a functional approach. Also, contracting authorities may be public and legal entities, but that the public interest and operates non-commercial activities...

  12. Inflation Forecast Contracts

    OpenAIRE

    Gersbach, Hans; Hahn, Volker

    2012-01-01

    We introduce a new type of incentive contract for central bankers: inflation forecast contracts, which make central bankers’ remunerations contingent on the precision of their inflation forecasts. We show that such contracts enable central bankers to influence inflation expectations more effectively, thus facilitating more successful stabilization of current inflation. Inflation forecast contracts improve the accuracy of inflation forecasts, but have adverse consequences for output. On balanc...

  13. Teaching about Contracts.

    Science.gov (United States)

    Froman, Michael; Kosnoff, Kathy

    1978-01-01

    Presents teaching strategies for introducing high school students to contract law. Offers as a case study a contract agreement between pro football players and team owners. Stresses basic elements of contracts (offer, acceptance, consideration, and understanding the bargaining process). Journal available from the American Bar Association, 1155…

  14. Contract law as fairness

    NARCIS (Netherlands)

    Klijnsma, J.

    2015-01-01

    This article examines the implications for contract law of Rawls' theory of justice as fairness. It argues that contract law as an institution is part of the basic structure of society and as such subject to the principles of justice. Discussing the basic structure in relation to contract law is

  15. 3 CFR - Government Contracting

    Science.gov (United States)

    2010-01-01

    ... contract oversight could reduce such sums significantly. Government outsourcing for services also raises... a risk that taxpayer funds will be spent on contracts that are wasteful, inefficient, subject to... mission. In such cases, the agency must ensure that the risks associated with noncompetitive contracts are...

  16. Contracting for nuclear fuels

    International Nuclear Information System (INIS)

    Schuessler, C.M.

    1981-10-01

    This paper deals with uranium sales contracts, i.e. with contractual arrangements in the first steps of the fuel cycle, which cover uranium production and conversion. The various types of contract are described and, where appropriate, their underlying business philosophy and their main terms and conditions. Finally, the specific common features of such contracts are reviewed. (NEA) [fr

  17. Other enrichment related contracts

    International Nuclear Information System (INIS)

    Hall, J.C.

    1978-01-01

    In addition to long-term enrichment contracts, DOE has other types of contracts: (1) short-term, fixed-commitment enrichment contract; (2) emergency sales agreement for enriched uranium; (3) feed material lease agreement; (4) enriched uranium storage agreement; and (5) feed material usage agreement

  18. 48 CFR 52.216-25 - Contract Definitization.

    Science.gov (United States)

    2010-10-01

    ..., including data other than certified cost or pricing data, and certified cost or pricing data, in accordance... is [insert target date for definitization of the contract and dates for submission of proposal... certified cost or pricing data]: (c) If agreement on a definitive contract to supersede this letter contract...

  19. 77 FR 65577 - Notice of Continuation of Concession Contract

    Science.gov (United States)

    2012-10-29

    ... Continuation of Concession Contract AGENCY: National Park Service, Interior. ACTION: Notice. SUMMARY: Pursuant to the terms of the listed concession contract, the National Park Service hereby gives public notice that it proposed to continue the concession contract listed below for a period not-to- exceed 1 year...

  20. 77 FR 9697 - Notice of Continuation of Concession Contract

    Science.gov (United States)

    2012-02-17

    ... DEPARTMENT OF THE INTERIOR National Park Service Notice of Continuation of Concession Contract... gives public notice that it proposes to continue the concession contract (CC-LAKE007-84) at Lake Mead...: April 1, 2012. SUPPLEMENTARY INFORMATION: The concession contract CC-LAKE007-84 will expire on March 31...

  1. A general approach to posterior contraction in nonparametric inverse problems

    NARCIS (Netherlands)

    Knapik, Bartek; Salomond, Jean Bernard

    In this paper, we propose a general method to derive an upper bound for the contraction rate of the posterior distribution for nonparametric inverse problems. We present a general theorem that allows us to derive contraction rates for the parameter of interest from contraction rates of the related

  2. Proposal for the Award of a Contract for the Supply of 13 kA and 20.5 kA, 18 V Switched-Mode Power Converters for the LHC

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the supply of 13 kA and 20.5 kA, 18 V switched-mode power converters using sub-converters of 3.25 kA. Following a market survey (MS-2866/SL/LHC) carried out among 81 firms in seventeen Member States and a call for tenders for prototypes (IT-2919/SL/LHC) sent on 11 June 2001, a call for tenders for the supply of the pre-series and series of 13 kA and 20.5 kA, 18 V switched-mode power converters both using sub-converters of 3.25 kA was sent to two firms on 17 September 2002. The Finance Committee is invited to agree to the negotiation of a contract with TRANSTECHNIK (DE), the only firm that has delivered a successfully qualifying prototype, for the supply of eighteen 13 kA and one 20.5 kA, 18 V switched-mode power converters and spares for a total amount of 4 607 731 euros (6 747 300 Swiss francs), not subject to revision. The rate of exchange used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract val...

  3. Litigation and the Timing of Settlement: Evidence from Commercial Disputes

    OpenAIRE

    Peter Grajzl; Katarina Zajc

    2015-01-01

    Although an overwhelming proportion of all legal disputes end in settlement, the determinants of the timing of settlement remain empirically underexplored. We draw on a novel dataset on the duration of commercial disputes in Slovenia to study how the timing of settlement is shaped by the stages and features of the litigation process. Using competing risk regression analysis, we find that events such as court-annexed mediation and the first court session, which enable the disputing parties to ...

  4. The urban features of informal settlements in Jakarta, Indonesia.

    Science.gov (United States)

    Alzamil, Waleed

    2017-12-01

    This data article contains the urban features of three informal settlements in Jakarta: A. Kampung Bandan; B. Kampung Luar Batang; And C. Kampung Muara Baru. The data describes the urban features of physical structures, infrastructures, and public services. These data include maps showing locations of these settlements, photography of urban status, and examples of urban fabric. The data are obtained from the statistical records and field surveys of three settlements cases.

  5. 25 CFR 900.133 - Does the declination process or the Contract Dispute Act apply to construction contract...

    Science.gov (United States)

    2010-04-01

    ...-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.133 Does the declination process or the Contract... 25 Indians 2 2010-04-01 2010-04-01 false Does the declination process or the Contract Dispute Act apply to construction contract amendments proposed either by an Indian tribe or tribal organization or...

  6. Duration in Production Contracts

    OpenAIRE

    MacDonald, James M.; Korb, Penelope J.

    2006-01-01

    We use 2003 and 2004 ARMS data to analyze variations in contract duration among growers of broilers who hold production contracts. Most contracts cover just a single flock, but many extend for 1-2 years, and a significant minority of broiler contracts specify lengths of 5, 10, and even 15 years. We find that grower debt and production volume are inversely related to the choice of a short term (a year or less) contract, while lengthy prior experience with the contractor promotes short term con...

  7. Deterring Spoilers: Peace Enforcement Operations and Political Settlements to Conflict

    National Research Council Canada - National Science Library

    Manseau, Nicole C

    2008-01-01

    .... In Somalia, Operation Restore Hope provided a strong peace enforcement operation, but ultimately failed to deter spoilers to United Nations negotiations for a political settlement to the conflict...

  8. Information Systems Development Contracts: an exploratory study of Australian legal practitioners' and Information Systems professionals' perceptions

    Directory of Open Access Journals (Sweden)

    Phil Joyce

    2003-05-01

    Full Text Available IS professionals are primarily concerned with the development of a project to meet the goals of a client. Unfortunately, IS professional do not always pay close attention to the contract or to its management and are often unaware of the legal implications of the contracts to which they are assenting. Legal advice can be sought during pre-contractual processes to help ensure that the contract meets the expectations of all the parties. If the project does not meet stakeholder’s expectations, thus causing a contract to come into dispute, lawyers may be called in to review the contract and to seek a settlement. This paper reports an exploratory study of the differences in perceptions of IS development contracts that exist between IS professionals and legal practitioners.

  9. Negotiating Efficient PPP Contracts

    DEFF Research Database (Denmark)

    Tvarnø, Christina D.

    . An opportunity the member states should consider using when procuring a PPP. This paper looks at the negotiation and contracting of a PPP in an economic theoretical and EU public procurement perspective and discusses how to establish an efficient PPP contract under a strong public law doctrine. Governments......This paper concerns Public Private Partnership (PPP) contracts in concern to the coming new 2014/24IEU public procurement directive. The new EU public procurement directive gives the public authority the opportunity to negotiate PPPs much more when they are implemented in national law...... procurement law. Furthermore, the paper seeks to establish a connection between public law, private law and the efficient PPP contract by drawing upon economic theory and empirical contract data from UK, US and Danish partnering contracts from the construction industry and the aim of contracting joint utility...

  10. Housing / Human Settlements Atlas series: continued support towards more sustainable human settlements

    CSIR Research Space (South Africa)

    Goss, H

    2010-09-01

    Full Text Available an answer to the key question of what (shelter type or model and supportive services) should be built where (in the most suitable location with the highest potential to support sustainable human settlements). The investment potential profile indicator has...

  11. 78 FR 66396 - Self-Regulatory Organizations; NYSE Arca, Inc.; Notice of Filing of Proposed Rule Change, as...

    Science.gov (United States)

    2013-11-05

    ... relating to codes of ethics. This Rule requires investment advisers to adopt a code of ethics that reflects.... Forwards on securities are contracts to purchase or sell securities for a fixed price at a future date beyond normal settlement time. Forwards on Fixed Income Instruments are contracts to purchase or sell...

  12. Public Service Provision in Clientelistic Political Settlements

    DEFF Research Database (Denmark)

    Whitfield, Lindsay; Hirvi, Marja

    2015-01-01

    The politics of public-service delivery continues to be neglected under the supposedly more context-sensitive post-Washington Consensus. Using interviews and documentary evidence from Ghana, this article provides an account of the networks of political interference and informal practices in Ghana......'s public water utility. It argues that, in order to understand why private-sector participation succeeds or fails and why similar arrangements have different outcomes across developing countries, we need to examine the effects of the informal institutional context, particularly the country......-specific political settlement in which public-service provision operates....

  13. Making contracting work better and cost less: Report of the Contract Reform Team

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In June 1993, Secretary of Energy Hazel O`Leary formed a Contract Reform Team, chaired by Deputy Secretary Bill White, to evaluate the contracting practices of the Department of Energy and to formulate specific proposals for improving those practices. This report summarizes the results of the work of the Contract Reform Team. It recommends actions for implementation that will significantly improve the Department`s contracting practices and will enable the Department to help create a government that -- in the words of Vice President Gore -- {open_quotes}works better and costs less.{close_quotes} These actions and the deadlines for their implementation are listed. Among other things, they recommend replacing the Department`s standard Management and Operating Contract with a new Performance-Based Management Contract and strengthening the Department`s systems for selecting and managing contractors.

  14. Proposal for the award of a contract for the supply of moulded assemblies of tape-wound cut cores of grain-oriented silicon-steel for the LHC beam dumping system

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply of moulded assemblies of tape-wound cut cores of grain-oriented silicon-steel for the three different types of fast pulsed magnets for the beam dumping system of the LHC. Following a market survey carried out among 14 firms in four Member States and six firms in two non-Member States, a call for tenders (IT-2674/SL/LHC) was sent on 26 January 2001 to one firm in one Member State. By the closing date, CERN had received a tender from the firm. The Finance Committee is invited to agree to the negotiation of a contract with TELMAG MAGNETIC COMPONENTS (UK), the only bidder, for the supply of 2885 moulded assemblies of tape-wound cut cores of grain-oriented silicon-steel, of three different types, for a total amount of 2 414 664 euros (3 692 147 Swiss francs), not subject to revision, with options for 560 additional moulded core assemblies of three different types, for an additional amount of 468 496 euros (716 355 Swiss francs), not subject to revision,...

  15. Proposal for the award of two contracts for the supply of fine-blanked low-carbon steel yoke laminations and inserts for the cold masses of the LHC superconducting dipole magnets

    CERN Document Server

    1999-01-01

    This document concerns the award of two contracts for the supply of 5 812 000 fine-blanked low-carbon steel yoke laminations, of two different types, and 5 800 000 inserts for the cold masses of the LHC superconducting dipole magnets. Following a market survey carried out among 70 firms in sixteen Member States and one firm in Japan, a call for tenders (IT-2467/LHC/LHC) was sent on 3 June 1999 to seven firms in four Member States. By the closing date, CERN had received five tenders. The Finance Committee is invited to agree to the negotiation of two contracts with: - FUG (DE) for the supply of 3 632 000 fine-blanked low-carbon steel yoke laminations and 3 625 000 inserts, which represents 5/8 of the total quantity required for the cold masses of the LHC superconducting dipole magnets, for a total amount of 2 525 563 euros, which at the exchange rate given in the tender correspond to 4 019 038 Swiss francs, subject to revision for contractual deliveries after 31 December 2001, with an option for the supply of ...

  16. Proposal for the award of two contracts for the supply of fine-blanked austenitic steel yoke laminations and inserts for the cold masses of the LHC superconducting dipole magnets

    CERN Document Server

    1999-01-01

    This document concerns the award of two contracts for the total supply of 642 000 fine-blanked austenitic steel yoke laminations, of two different types, and 642 000 inserts for the cold masses of the LHC superconducting dipole magnets. Following a market survey carried out among 70 firms in sixteen Member States and one firm in Japan, a call for tenders (IT-2700/LHC/LHC) was sent on 3 June 1999 to seven firms in four Member States and one firm in Japan. By the closing date, CERN had received five tenders. The Finance Committee is invited to agree to the negotiation of two contracts with: - ELAY INDUSTRIAL (ES) for the supply of 324 000 fine-blanked austenitic steel yoke laminations of the first type and the corresponding number of inserts, which represents the total required quantity of laminations of the first type and of corresponding inserts for the cold masses of the LHC superconducting dipole magnets, for a total amount of 481 814 euros, which at the exchange rate given in the tender correspond to 770 8...

  17. Proposal for the award of a contract for the supply of four-quadrant switched-mode power converters rated at ± 120, ± 10V for the LHC

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the supply of power converters rated at ±120A, ±10V for the LHC. Following a market survey carried out among 147 firms in nineteen Member States, a call for tenders (IT-3037/AB/LHC) was sent on 5 May 2003 to 10 firms and three consortia, each consisting of two firms, in nine Member States. By the closing date, CERN had received nine tenders from nine firms in seven Member States. The Finance Committee is invited to agree to the negotiation of a contract with EFACEC (PT), the lowest conforming bidder after realignment, for the supply of 339 four-quadrant switched-mode power modules and 110 racks for a total amount of 1 652 128 euros (2 534 894 Swiss francs), not subject to revision, with an option for the supply of additional power modules and racks, for a total amount of 142 846 euros (219 171 Swiss francs), subject to revision for inflation from 1 January 2006, bringing the total amount to a maximum of 1 794 974 euros (2 754 065 Swiss francs). The rate of ...

  18. Proposal for the award of a contract for the supply of four-quadrant switched-mode power converters rated at ±60A, ±8V for the LHC

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the supply of 834 four-quadrant switched-mode power converters rated at ±60A, ±8V and 200 racks for the LHC. Following a market survey carried out among 154 firms in nineteen Member States, a call for tenders (IT-2944/AB/LHC) was sent on 2 May 2003 to 11 firms and three consortia in twelve Member States. By the closing date, CERN had received eight tenders from eight firms in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with CEL (FR), the lowest bidder complying with the specification, for the supply of 834 four-quadrant switched-mode power converters and 200 racks for a total amount of 2 343 808 euros (3 580 629 Swiss francs), not subject to revision, with an option for additional four-quadrant switched-mode power converters and racks for a total amount of 215 301 euros (328 915 Swiss francs), subject to revision for inflation from 1 January 2006, bringing the overall total to 2 559 109 euros (3 909 544 Swis...

  19. Using a Birth Center Model of Care to Improve Reproductive Outcomes in Informal Settlements-a Case Study.

    Science.gov (United States)

    Wallace, Jacqueline

    2018-06-04

    The world is becoming increasingly urban. For the first time in history, more than 50% of human beings live in cities (United Nations, Department of Economic and Social Affairs, Population Division, ed. (2015)). Rapid urbanization is often chaotic and unstructured, leading to the formation of informal settlements or slums. Informal settlements are frequently located in environmentally hazardous areas and typically lack adequate sanitation and clean water, leading to poor health outcomes for residents. In these difficult circumstances women and children fair the worst, and reproductive outcomes for women living in informal settlements are grim. Insufficient uptake of antenatal care, lack of skilled birth attendants and poor-quality care contribute to maternal mortality rates in informal settlements that far outpace wealthier urban neighborhoods (Chant and McIlwaine (2016)). In response, a birth center model of maternity care is proposed for informal settlements. Birth centers have been shown to provide high quality, respectful, culturally appropriate care in high resource settings (Stapleton et al. J Midwifery Women's Health 58(1):3-14, 2013; Hodnett et al. Cochrane Database Syst Rev CD000012, 2012; Brocklehurst et al. BMJ 343:d7400, 2011). In this paper, three case studies are described that support the use of this model in low resource, urban settings.

  20. New staff contract policy

    CERN Document Server

    HR Department

    2006-01-01

    Following discussion at TREF and on the recommendation of the Finance Committee, Council approved a new staff contract policy, which became effective on 1 January 2006. Its application is covered by a new Administrative Circular No. 2 (Rev. 3) 'Recruitment, appointment and possible developments regarding the contractual position of staff members'. The revised circular replaces the previous Circulars No. 9 (Rev. 3) 'Staff contracts' and No. 2 (Rev. 2) 'Guidelines and procedures concerning recruitment and probation period for staff members'. The main features of the new contract policy are as follows: The new policy provides chances for long-term employment for all staff recruits staying for four years without distinguishing between those assigned to long-term or short-term activities when joining CERN. In addition, it presents a number of simplifications for the award of ICs. There are henceforth only 2 types of contract: Limited Duration (LD) contracts for all recruitment and Indefinite Contracts (IC) for...

  1. Analysis of an Underground Structure Settlement Risk due to Tunneling

    DEFF Research Database (Denmark)

    Vahdatirad, Mohammad Javad; Ghodrat, Hadi; Firouzianbandpey, Sarah

    2010-01-01

    of the underground commercial center structure settlement is estimated using both empirical and numerical methods. The settlement risk level of the commercial center structure is determined based on presented definitions about risk classification of various types of structures. Consequently, tunneling processes...

  2. 12 CFR 308.15 - Opportunity for informal settlement.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Opportunity for informal settlement. 308.15 Section 308.15 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION PROCEDURE AND RULES OF PRACTICE RULES OF PRACTICE AND PROCEDURE Uniform Rules of Practice and Procedure § 308.15 Opportunity for informal settlement. Any respondent may, at any time...

  3. Transparency and public participation in WTO dispute settlement

    NARCIS (Netherlands)

    Ahlborn, C.S.; Pfitzer, J.H.

    2009-01-01

    In order to offer a comprehensive analysis of transparency and public participation in the WTO dispute settlement system, this memorandum first considers the current participatory practice throughout the various steps of the dispute settlement process. Secondly, the current state of the DSU

  4. Resilience and social costs: centralised towns vs. distributed settlements?

    DEFF Research Database (Denmark)

    Hendriksen, Kåre

    In government reports and political debates in Greenland it is often stated, that the divided settlement in general and especially the settlements are too costly, and that the outlying districts in general do not contribute sufficiently to the national economy. This presumption is used as an argu...

  5. 47 CFR 1.244 - Designation of a settlement judge.

    Science.gov (United States)

    2010-10-01

    ... Proceedings Presiding Officer § 1.244 Designation of a settlement judge. (a) In broadcast comparative cases... Administrative Law Judge for action. (c) If, in the discretion of the Chief Administrative Law Judge, it appears... Commission's Administrative Law Judges are eligible to act as settlement judges, except that an...

  6. 28 CFR 43.3 - Settlement and waiver of claims.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Settlement and waiver of claims. 43.3 Section 43.3 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) RECOVERY OF COST OF HOSPITAL AND MEDICAL CARE AND TREATMENT FURNISHED BY THE UNITED STATES § 43.3 Settlement and waiver of claims. (a) The...

  7. Conciliation as the traditional method of disputes settlement in PRC

    Directory of Open Access Journals (Sweden)

    Svetlana F. Litvinova

    2011-12-01

    Full Text Available The author of the article researches one of the peculiarities of civil disputes settlement in China. This peculiarity is the conciliatory method that is used during disputes settlement. The using of the method is based on Confucianism. The content of the method has been viewed in the article.

  8. Formalisation of Unplanned Settlements and Its Implications on ...

    African Journals Online (AJOL)

    Formalisation of Unplanned Settlements and Its Implications on Poverty Reduction: The Case of Dar es Salaam City. ... Properties found in these areas are sound or improvable. ... Key words: regularisation, formalisation, land tenure, property rights, unplanned/informal settlements, poverty reduction, Dar es Salaam ...

  9. 32 CFR 536.124 - Settlement authority for maritime claims.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Settlement authority for maritime claims. 536.124 Section 536.124 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY CLAIMS AND ACCOUNTS CLAIMS AGAINST THE UNITED STATES Maritime Claims § 536.124 Settlement authority for maritime...

  10. 32 CFR 537.18 - Settlement authority for maritime claims.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Settlement authority for maritime claims. 537.18 Section 537.18 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY CLAIMS AND ACCOUNTS CLAIMS ON BEHALF OF THE UNITED STATES § 537.18 Settlement authority for maritime claims. (a) The...

  11. Engineering approach to model and compute electric power markets settlements

    International Nuclear Information System (INIS)

    Kumar, J.; Petrov, V.

    2006-01-01

    Back-office accounting settlement activities are an important part of market operations in Independent System Operator (ISO) organizations. A potential way to measure ISO market design correctness is to analyze how well market price signals create incentives or penalties for creating an efficient market to achieve market design goals. Market settlement rules are an important tool for implementing price signals which are fed back to participants via the settlement activities of the ISO. ISO's are currently faced with the challenge of high volumes of data resulting from the increasing size of markets and ever-changing market designs, as well as the growing complexity of wholesale energy settlement business rules. This paper analyzed the problem and presented a practical engineering solution using an approach based on mathematical formulation and modeling of large scale calculations. The paper also presented critical comments on various differences in settlement design approaches to electrical power market design, as well as further areas of development. The paper provided a brief introduction to the wholesale energy market settlement systems and discussed problem formulation. An actual settlement implementation framework and discussion of the results and conclusions were also presented. It was concluded that a proper engineering approach to this domain can yield satisfying results by formalizing wholesale energy settlements. Significant improvements were observed in the initial preparation phase, scoping and effort estimation, implementation and testing. 5 refs., 2 figs

  12. Automatic settlement analysis of single-layer armour layers

    NARCIS (Netherlands)

    Hofland, B.; van gent, Marcel

    2016-01-01

    A method to quantify, analyse, and present the settlement of single-layer concrete armour layers of coastal structures is presented. The use of the image processing technique for settlement analysis is discussed based on various modelling
    studies performed over the years. The accuracy of the

  13. Experimental analysis of railway track settlement in transition zones

    NARCIS (Netherlands)

    Wang, H.; Markine, V.L.; Liu, X.

    2017-01-01

    Transition zones in railway tracks are the locations with considerable changes in the vertical support structures. Due to the differential stiffness and settlement in the open track and the engineering structure resulting in the dynamic amplification of the wheel forces, track settlement is usually

  14. Macrofauna Settlement on Pearl Oyster Collectors in Kenya ...

    African Journals Online (AJOL)

    Key words: Pearl oysters, seed collection, macrofauna, bivalves, settlement, monsoon seasons,. Kenya .... have shown that pearl oyster settlement is higher within calm ...... collectors in the Timor Sea, Northern Australia. J. Shellfish ... systems. Aquaculture, 189: 375-388. Urban, H.J. (2000b): Culture potential of the pearl.

  15. Analysis of spatial pattern of settlements in the federal capital ...

    African Journals Online (AJOL)

    Human settlements are important, seemingly static but dynamic, features of the cultural landscape that have attracted several studies due to the important role they play in human life. This paper examined the spatial distribution of settlements in the Federal Capital Territory (FCT) of Nigeria. The analysis uses vector based ...

  16. 47 CFR 64.1002 - International settlements policy.

    Science.gov (United States)

    2010-10-01

    ... (CONTINUED) MISCELLANEOUS RULES RELATING TO COMMON CARRIERS International Settlements Policy and Modification... accounting rate modification, filed pursuant to § 64.1001, that includes a settlement rate that is at or... behavior that is harmful to U.S. customers. Carriers and other parties filing complaints must support their...

  17. 29 CFR 1603.108 - Settlement and alternative dispute resolution.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Settlement and alternative dispute resolution. 1603.108... Settlement and alternative dispute resolution. (a) The parties are at all times free to settle all or part of... a neutral mediator or to any other alternative dispute resolution process authorized by the...

  18. The development of informal settlements in South Africa, with particular reference to informal settlements around Daveyton on the East Rand, 1970-1999

    OpenAIRE

    2012-01-01

    D.Litt. et Phil. The purpose of the study is to analyse the development of informal settlements in South Africa, with particular reference to the role of the Government in the improvement of informal settlement conditions around Daveyton, especially at the Etwatwa informal settlement. Research has shown that there is common experience in developing countries in Africa, Asia and Latin America in as far as the development of squatter settlements or informal settlements are concerned. This st...

  19. Chaos synchronization based on contraction principle

    International Nuclear Information System (INIS)

    Wang Junwei; Zhou Tianshou

    2007-01-01

    This paper introduces contraction principle. Based on such a principle, a novel scheme is proposed to synchronize coupled systems with global diffusive coupling. A rigorous sufficient condition on chaos synchronization is derived. As an example, coupled Lorenz systems with nearest-neighbor diffusive coupling are investigated, and numerical simulations are given to validate the proposed synchronization approach

  20. Consistency Checking of Web Service Contracts

    DEFF Research Database (Denmark)

    Cambronero, M. Emilia; Okika, Joseph C.; Ravn, Anders Peter

    2008-01-01

    Behavioural properties are analyzed for web service contracts formulated in Business Process Execution Language (BPEL) and Choreography Description Language (CDL). The key result reported is an automated technique to check consistency between protocol aspects of the contracts. The contracts...... are abstracted to (timed) automata and from there a simulation is set up, which is checked using automated tools for analyzing networks of finite state processes. Here we use the Concurrency Work Bench. The proposed techniques are illustrated with a case study that include otherwise difficult to analyze fault...

  1. A Module Language for Typing by Contracts

    Science.gov (United States)

    Glouche, Yann; Talpin, Jean-Pierre; LeGuernic, Paul; Gautier, Thierry

    2009-01-01

    Assume-guarantee reasoning is a popular and expressive paradigm for modular and compositional specification of programs. It is becoming a fundamental concept in some computer-aided design tools for embedded system design. In this paper, we elaborate foundations for contract-based embedded system design by proposing a general-purpose module language based on a Boolean algebra allowing to define contracts. In this framework, contracts are used to negotiate the correctness of assumptions made on the definition of a component at the point where it is used and provides guarantees to its environment. We illustrate this presentation with the specification of a simplified 4-stroke engine model.

  2. Determining the hydrodynamic indices of contractions

    International Nuclear Information System (INIS)

    Blagov, Eh.E.

    2002-01-01

    The new dependences, making it possible only by measuring the flow rate and pressure drop on the contraction device (CD) with the known geometry, including the regulatory organ, in the non-crisis mode of the turbulent flow to calculate all the hydrodynamic indices of this device, including the pressure reduction in the jet contraction, are obtained. This simplifies and accelerates the CD hydraulic tests of all types. The new methodology for determining the cavitation factual start on the CD is proposed [ru

  3. Structured settlement annuities, part 1: overview and the underwriting process.

    Science.gov (United States)

    Schmidt, C J; Singer, R B

    2000-01-01

    Structured settlement underwriting is the underwriting of medically impaired lives for the purchase of an annuity to fund the settlement. Other than risk assessment, structured settlement (SS) underwriting has little in common with traditional life insurance underwriting. Most noteworthy of these differences is the relative lack of actuarial data on which to base decisions about mortality and the necessity for prospective thinking about risk assessment. The purpose of this paper is to provide a foundation for understanding the structured settlement business and to contrast the underwriting of structured settlements with that of traditional life insurance. This is the first part of a two-part article on SS annuities. Part 2 deals with the mortality experience in SS annuitants and the life-table methodology used to calculate life expectancy for annuitants at increased mortality risk.

  4. Contracting for Public Services

    DEFF Research Database (Denmark)

    Greve, Carsten

    strategic purchasing understanding markets communicating the contracting decision designing and drafting the contract the role of the consumer the regulation of service provision Illustrated throughout with practitioner case-studies from a range of OECD countries, this book presents an important new......Insightful and comprehensive and covering new subjects like globalization and IT, this text, international in its approach, provides a thorough introduction to the key phases of the contracting process and the skills required by managers in its implementation. These include: policy for contracting...

  5. Smart contracts sobre Bitcoin

    OpenAIRE

    Andreu Alemany, Josep Miquel

    2016-01-01

    El present treball final de màster realitza una introducció als smart contracts. El treball introdueix el concepte de contracte intel·ligent, els seus usos i alguns exemples existents. Seguidament proporciona les nocions necessàries de les transaccions del protocol Bitcoin per poder implementar un contracte intel·ligent, usant la blockchain que ofereix el protocol. Per últim, s'explica la implementació d'un contracte intel·ligent usant bitcoin: un canal de micropagaments. El presente traba...

  6. A global perspective on foreign contract labor.

    Science.gov (United States)

    Smart, J E; Casco, R R

    1988-01-01

    This paper provides a general overview on foreign contract labor. The growth in the use of foreign contract labor is described with reference to other types of international labor movements such as 1) illegal, undocumented, or irregular migration; 2) free migration; and 3) permanent settlement migration. Within this general context, the various national advantages and disadvantages of contract labor are outlined. Particular issues like the role of trade unions and the likely future international labor circulation are noted. The 1984 World Labour Report estimates a global stock of almost 22 million foreign workers. Despite lack of reliable data, the size of irregular labor flows is considerable. More than 4 million undocumented workers, primarily Mexicans, can be found in the US alone. Other major flows of illegal labor go from China to Hong Kong, Malaysia to Singapore, Columbia to Venezuela, and poor Arab countries to oil-exporting countries in the Middle East. Laws are often poorly enforced and contradictory. Employers often actively recruit illegal migrants. While permanent migration was formerly the primary source of foreign workers, the numbers migrating in this manner are decreasing significantly. In absolute terms, host countries gain considerably more through the use of contract labor than sending countries. The pervasive commitment of national governments to economic growth is a prime consideration in the decision to import foreign labor. In general, trade unions have created an environment wherein the use of foreign labor in the formal as opposed to the informal labor market is more difficult. The disadvantages of labor export include the costs of family separation, worker exploitation, and cultural alienation. Remittances constitute the most tangible return of labor export. In many countries they have made a very considerable impact on the balance of payments deficit.

  7. Deforestation and Carbon Stock Loss in Brazil's Amazonian Settlements.

    Science.gov (United States)

    Yanai, Aurora Miho; Nogueira, Euler Melo; de Alencastro Graça, Paulo Maurício Lima; Fearnside, Philip Martin

    2017-03-01

    We estimate deforestation and the carbon stock in 2740 (82 %) of the 3325 settlements in Brazil's Legal Amazonia region. Estimates are made both using available satellite data and a carbon map for the "pre-modern" period (prior to 1970). We used data from Brazil's Project for Monitoring Deforestation in Amazonia updated through 2013 and from the Brazilian Biomes Deforestation Monitoring Project (PMDBBS) updated through 2010. To obtain the pre-modern and recent carbon stocks we performed an intersection between a carbon map and a map derived from settlement boundaries and deforestation data. Although the settlements analyzed occupied only 8 % of Legal Amazonia, our results indicate that these settlements contributed 17 % (160,410 km 2 ) of total clearing (forest + non-forest) in Legal Amazonia (967,003 km 2 ). This represents a clear-cutting of 41 % of the original vegetation in the settlements. Out of this total, 72 % (115,634 km 2 ) was in the "Federal Settlement Project" (PA) category. Deforestation in settlements represents 20 % (2.6 Pg C) of the total carbon loss in Legal Amazonia (13.1 Pg C). The carbon stock in remaining vegetation represents 3.8 Pg C, or 6 % of the total remaining carbon stock in Legal Amazonia (58.6 Pg C) in the periods analyzed. The carbon reductions in settlements are caused both by the settlers and by external actors. Our findings suggest that agrarian reform policies contributed directly to carbon loss. Thus, the implementation of new settlements should consider potential carbon stock losses, especially if settlements are created in areas with high carbon stocks.

  8. 78 FR 4425 - Notice of Proposed Information Collection: Comment Request; Debt Resolution Program

    Science.gov (United States)

    2013-01-22

    ... amount due must submit a Personal Financial Statement and Settlement Offer. HUD uses the information to... Settlement Offer. HUD uses the information to analyze debtors' financial positions and then approve... Information and Proposed Use HUD is required to collect debt owed to the agency. As part of the collection...

  9. 48 CFR 315.605 - Content of unsolicited proposals.

    Science.gov (United States)

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 315.605 Content of... prepared under Government supervision; (b) The methods and approaches stated in the proposal were developed... Title (This certification shall be signed by a responsible management official of the proposing...

  10. Contour Crafting Simulation Plan for Lunar Settlement Infrastructure Build-Up

    Science.gov (United States)

    Khoshnevis, B.; Carlson, A.; Leach N.; Thangavelu, M.

    2016-01-01

    Economically viable and reliable building systems and tool sets are being sought, examined and tested for extraterrestrial infrastructure buildup. This project focused on a unique architecture weaving the robotic building construction technology with designs for assisting rapid buildup of initial operational capability Lunar and Martian bases. The project aimed to study new methodologies to construct certain crucial infrastructure elements in order to evaluate the merits, limitations and feasibility of adapting and using such technologies for extraterrestrial application. Current extraterrestrial settlement buildup philosophy holds that in order to minimize the materials needed to be flown in, at great transportation costs, strategies that maximize the use of locally available resources must be adopted. Tools and equipment flown as cargo from Earth are proposed to build required infrastructure to support future missions and settlements on the Moon and Mars.

  11. A taxonomy for the evolution of human settlements on the moon and Mars

    Science.gov (United States)

    Roberts, Barney B.; Mandell, Humboldt C.

    1991-01-01

    A proposed structure is described for partnerships with shared interests and investments to develop the technology and approach for evolutionary surface systems for the moon and Mars. Five models are presented for cooperation with specific references to the technical evolutionary path of the surface systems. The models encompass the standard customer/provider relationship, a concept for exclusive government use, a joint venture with a government-sponsored non-SEI market, a technology joint-development approach, and a redundancy model to insure competitive pricing. The models emphasize the nonaerospace components of the settlement technologies and the decentralized nature of surface systems that make the project suitable for private industrial development by several companies. It is concluded that the taxonomy be considered when examining collaborative opportunities for lunar and Martian settlement.

  12. 48 CFR 252.217-7027 - Contract definitization.

    Science.gov (United States)

    2010-10-01

    ...., fixed-price or cost-and-fee) proposal and cost or pricing data supporting its proposal. (b) The schedule for definitizing this contract is as follows (insert target date for definitization of the contract... of the make-or-buy and subcontracting plans and cost or pricing data). (c) If agreement on a...

  13. [Ulysses contract in psychiatry].

    Science.gov (United States)

    Daverio, Andrea; Piazzi, Gioia; Saya, Anna

    2017-01-01

    Over the last twenty years we have witnessed a growing focus on the rights of the ill people. The debate on informed consent and a new redefinition of the therapeutic relationship is constantly evolving. With this article, we propose a critical literature review of the so-called "Ulysses contract" or "psychiatric advance directives". It refers to the will that a subject expresses in writing, or orally, about the treatments he or she wishes or does not wish to be subject to if the time comes when it may be impossible to express his/her consent. This can especially occur in those with psychiatric disorders with serious clinical involvement and remitting-relapse (typically bipolar disorder, but also chronic delusional disorders and schizophrenia). In this context, the question is whether during intercritical periods the patient may or may not leave instructions to their care-givers. This aspect opens up to a series of interdisciplinary problems. In this article, we want to show the complexity of this debate from a clinical, ethical, legal and psychodynamic point of view, emphasizing the strengths and the major criticisms of the psychiatric advance directives for each area.

  14. Landsat 6 contract signed

    Science.gov (United States)

    Maggs, William Ward

    A new agreement provides $220 million for development and construction of the Landsat 6 remote sensing satellite and its ground systems. The contract, signed on March 31, 1988, by the Department of Commerce (DOC) and the Earth Observation Satellite (EOSAT) Company of Lanham, Md., came just days after approval of DOC's Landsat commercialization plan by subcommittees of the House and Senate appropriations committees.The Landsat 6 spacecraft is due to be launched into orbit on a Titan II rocket in June 1991 from Vandenburg Air Force Base, Calif. The satellite will carry an Enhanced Thematic Mapper (ETM) sensor, an instrument sensitive to electromagnetic radiation in seven ranges or bands of wavelengths. The satellite's payload will also include the Sea Wide Field Sensor (Sea-WiFS), designed to provide information on sea surface temperature and ocean color. The sensor is being developed in a cooperative effort by EOSAT and the National Aeronautics and Space Administration (NASA). A less certain passenger is a proposed 5-m resolution, three-band sensor sensitive to visible light. EOSAT is trying to find both private financing for the device and potential buyers of the high-resolution imagery that it could produce. The company has been actively courting U.S. television networks, which have in the past used imagery from the European Système Probatoire d'Observation de la Terre (SPOT) satellite for news coverage.

  15. Antidumping settlement rumors push prices up

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The NUKEM price range jumped sharply last month, ending up at $8.05-$8.70. The market took off amidst reports that price and volume quotas would be part of the antidumping settlement being negotiated by certain CIS republics and the US Department of Commerce. And the republics got no relief from the US Court of International Trade. In an opinion issues September 25, Judge Jane Restani upheld the validity of Commerce's investigation, reinforcing the rising trend in prices. The lower end of the range was established by offers of CIS origin uranium to those utilities that will not be affected by Euratom or Commerce restrictions. Ten deals were completed on the spot market in September. In all but one, the sellers were intermediaries

  16. Democratic contract law

    NARCIS (Netherlands)

    Hesselink, M.W.

    2015-01-01

    This article discusses the normative relationship between contract law and democracy. In particular, it argues that in order to be legitimate contract law needs to have a democratic basis. Private law is not different in this respect from public law. Thus, the first claim made in this article will

  17. Contract Teachers in India

    Science.gov (United States)

    Goyal, Sangeeta; Pandey, Priyanka

    2013-01-01

    In this paper, we use non-experimental data from government schools in Uttar Pradesh and Madhya Pradesh, two of the largest Indian states, to present average school outcomes by contract status of teachers. We find that contract teachers are associated with higher effort than civil service teachers with permanent tenures, before as well as after…

  18. Whither Performance Contracting?

    Science.gov (United States)

    Green, Norman S.

    This report describes briefly performance contracts; discusses their shortcomings, pitfalls, and advantages; and gives some insight into the future development of this new concept. Two shortcomings of performance contracting include (1) teaching to the test and (2) board abdication of its responsibility for making final decisions about educational…

  19. Comparing contracting performance

    DEFF Research Database (Denmark)

    Lindholst, Andrej Christian

    . Hypotheses are suggested for the role of culture, competition, contracts, capabilities and collaboration for contracting performance between and across the countries. Arguments are tested against data from on four comparable national surveys of private delivery of park and road maintenance services in local...

  20. BOT Outsourcing Contracts

    DEFF Research Database (Denmark)

    Ørberg Jensen, Peter D.; Petersen, Bent

    2012-01-01

    Build-operate-transfer (BOT) contracting has been widely usen in the engineering and construction industry, but has only recently been introduced in services industry domains. Notably, service provider firms from emerging markets have recently started offering BOT outsourcing contracts. In this p...