WorldWideScience

Sample records for contract number qlrt-2001-01666

  1. Dynamic Recruitment of Cdc2 to Specific Microtubule Structures during Mitosis

    Czech Academy of Sciences Publication Activity Database

    Weingartner, M.; Binarová, Pavla; Dryková, Denisa; Achweighofer, A.; David, P.; Heberle, E.; Doonan, J.; Bogre, L.

    2001-01-01

    Roč. 13, - (2001), s. 1929-1943 ISSN 1040-4651 R&D Projects: GA AV ČR IAA5020803 Grant - others:XE(XC) GA QLRT-00454 Keywords : dynamic * recruitment * specific Subject RIV: EE - Microbiology, Virology Impact factor: 11.081, year: 2001

  2. INDEFINITE CONTRACT REVIEW 2001

    CERN Multimedia

    Human Resources Division

    2001-01-01

    The Director-General has decided to review staff members in professional categories 2 to 5 satisfying the criteria for consideration for the award of an indefinite contract, in accordance with Article R II 1.20 of the Staff Regulations. Staff members holding a fixed-term contract which it has been decided not to renew will not be considered. The following stages are foreseen: 1. Candidates qualifying for review in accordance with Article R II 1.20 of the Staff Regulations and the Administrative Circular N° 9 will be contacted by Human Resources Division. 2. The criteria as to when staff members qualify for review are described in Administrative Circular N° 9. These include the following: staff members who are in their fourth year of service on a fixed-term contract; in addition, for staff members having three years or more of previous relevant service in the Organization on a contract of limited duration (or term-contract) and upon proposal by the division leader concerned, consideration fo...

  3. 2001 contract management survey.

    Science.gov (United States)

    2001-10-01

    For the second year running, hospitals are spending more on clinical outsourcing than on business services. The Eleventh Annual Contract Services Survey shows that, in clinical areas, executives use outsourcing to acquire specialized expertise with cost savings secondary. Reducing costs and FTEs are the primary reasons for outsourcing business operations. Business service contracts are more likely to meet expectations for cost savings. Overall, satisfaction levels are up, but in some areas there's still a lot of room for improvement. This report examines current trends in outsourcing, strategies for the future, satisfaction levels, the decisionmaking process, contract features, and costs.

  4. Hazard Analysis and identification of Critical Control Points of collagen extraction from cod by-products

    NARCIS (Netherlands)

    Aalberts, C.H.J.

    2004-01-01

    The aim of the European research project “UTILISATION AND STABILISATION OF BY-PRODUCTS FROM COD SPECIES” (QLK1-CT-2000-01017 QLRT-2001-02829) is to investigate whether collagen from fish by-products could serve as an important raw material in high quality food. Since Atlantic cod is a major

  5. Government/Andra 2001/2004 quadrennial contract

    International Nuclear Information System (INIS)

    2002-01-01

    The French national agency for the management of radioactive wastes (ANDRA) was created on December 31, 1991 with the objective of carrying out research works in the domain of the long term management of radioactive wastes: research programs, management of waste disposal facilities, realisation and exploitation of underground laboratories for the design and setting up of new disposal facilities, definition of safety rules, conditioning and disposal specifications, inventory and localization of all radioactive wastes inside the French territory. This documents aims at defining the missions of the Andra for the 2001-2004 era, ten years after its creation: classification of radioactive wastes; positioning and missions of the Agency; objectives for the industrial mission (safety, storage and disposal solutions, management solutions, continuation of the inventory work, optimization of disposal costs, memory and surveillance); objectives of the research mission (high scientific level projects, structuration of researches, reinforcement of the coordination between the 3 axes of the 1991 law, exploitation and management of underground laboratories, spreading out of scientific results); objectives of the information mission (inventory and localization of wastes, realization of a reference inventory, contribution to the local information, proposal for a clear and verifiable information); international policy objectives (promotion of contacts and cooperations with foreign partners, representation of the Agency among the big international organizations, punctual missions for the valorization of the Agency competencies); evaluation and quality assurance inside the Agency (safety evaluation, scientific and technical evaluation, quality policy and environment, ethics, contract follow up). (J.S.)

  6. Government/Andra 2001/2004 quadrennial contract; Contrat quadriennal 2001/2004 Etat/Andra

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    The French national agency for the management of radioactive wastes (ANDRA) was created on December 31, 1991 with the objective of carrying out research works in the domain of the long term management of radioactive wastes: research programs, management of waste disposal facilities, realisation and exploitation of underground laboratories for the design and setting up of new disposal facilities, definition of safety rules, conditioning and disposal specifications, inventory and localization of all radioactive wastes inside the French territory. This documents aims at defining the missions of the Andra for the 2001-2004 era, ten years after its creation: classification of radioactive wastes; positioning and missions of the Agency; objectives for the industrial mission (safety, storage and disposal solutions, management solutions, continuation of the inventory work, optimization of disposal costs, memory and surveillance); objectives of the research mission (high scientific level projects, structuration of researches, reinforcement of the coordination between the 3 axes of the 1991 law, exploitation and management of underground laboratories, spreading out of scientific results); objectives of the information mission (inventory and localization of wastes, realization of a reference inventory, contribution to the local information, proposal for a clear and verifiable information); international policy objectives (promotion of contacts and cooperations with foreign partners, representation of the Agency among the big international organizations, punctual missions for the valorization of the Agency competencies); evaluation and quality assurance inside the Agency (safety evaluation, scientific and technical evaluation, quality policy and environment, ethics, contract follow up). (J.S.)

  7. Temporary labour contracts

    CERN Document Server

    2001-01-01

    At its September 2000 meeting, the Finance Committee approved a second one-year extension of the four existing temporary labour contracts (L020/PE, L021/PE, L022/PE, L023/PE) until 31 December 2001 for a total amount not exceeding 6 000 000 Swiss francs at 2000 prices. The Finance Committee is invited: - to take note that the estimated annual expenditure on temporary labour in 2001 will amount to approximately 4 500 000 Swiss francs against the previously estimated 6 000 000 Swiss francs; - to approve the extension of the four existing contracts by six months to 30 June 2002 for an overall amount not exceeding 1 500 000 Swiss francs; - to take note that new contracts for the Swiss part of the CERN site will be submitted for adjudication in December 2001 and that new contracts for the French part of the CERN site will be submitted for adjudication in the course of 2002.

  8. Aircraft Survivability: Assuring M&S Credibility for Defense Acquisition and T&E, Fall 2001

    Science.gov (United States)

    2001-01-01

    Acquisition and T&E, Fall 2001 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER...Dave worked his way through col- lege at Disneyland , first selling ice cream and then picking up trash. Dave met his wife, Te r r i , his freshman

  9. The plan contract between CEA and the French state for 2001-2004

    International Nuclear Information System (INIS)

    Pijaudier-Cabot, F.

    2001-01-01

    The French energy commission (CEA) has defined 3 axis of development in the framework of a 4 year contract with the government. The first axis is to propose technological solutions for improving competitiveness of nuclear energy, for managing nuclear wastes and for assuring safety at any step of the nuclear industry. The second axis concerns promoting new technologies in the fields of energy, of information and of bio-engineering. CEA will develop studies about the use of hydrogen as an alternative energy for transport. The third axis deals more particularly with fundamental research in the fields of energy, of environment, of bio-technologies and of health (research about the prion for instance). The subsidy given by the state has been increased by 3.4% for 2001. (A.C.)

  10. Temporary labour contracts

    CERN Document Server

    2000-01-01

    The five contracts for Temporary Labour assignments on the CERN site (L020/PE, L 021/PE, L 022/PE, L 023/PE and L 024/PE) approved by the Finance Committee in March 1996 (CERN/FC/3857) reached the end of their initial three-year contractual period at the end of December 1999. At CERN?s request, in September 1999 the Finance Committee approved an extension of these contracts for the year 2000 for a total amount not exceeding 6 000 000 Swiss francs (CERN/FC/4196). In December 1999, one of the five contractors, FIRCROFT, withdrew from its contract for 2000. Following the satisfactory execution of the four remaining contracts during 2000, CERN requests approval to extend them from January 2001 for the second of the two optional years provided for in the original adjudication. The Finance Committee is invited to approve the extension of the existing contracts until 31 December 2001 for a total amount not exceeding 6 000 000 Swiss francs at 2000 prices.

  11. Proceedings of the 2001 workshop on the utilization of research reactors (Contract research)

    International Nuclear Information System (INIS)

    2003-03-01

    The 2001 Workshop on the Utilization of Research Reactors, which is the tenth Workshop on the theme of research reactor utilization, was held in Beijing, China from November 5 to 9. This Workshop was executed based on the agreement in the Second Coordinator's Meeting of Forum for Nuclear Cooperation in Asia (FNCA) held in Tokyo, March 2001. The Workshop consists of three groups under the themes of the following fields; 1) Neutron Scattering, 2) Tc Generator, and 3) Neutron Activation Analysis. The total number of participants for the Workshop was about 70 people from 8 countries; China, Indonesia, Korea, Malaysia, the Philippines, Thailand, Vietnam, and Japan. This report consists of 12 papers from the plenary session, 12 papers for Neutron Scattering, 13 papers for Tc Generator, 11 papers for Neutron Activation Analysis and a summary report. The 48 of the presented papers are indexed individually. (J.P.N.)

  12. 2001 activity report; Rapport d'activite 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    Managing radioactive waste for a better control in the future. The Quadrennial State/Andra contract, the double ISO 9001 (quality) and ISO 140001 (environment) certification and three diversified missions: industry, research and information. Those are the highlights of the activity report where the reader will be able to learn more about the Agency's major achievements in 2001. An appendix contains the management report of the Agency.

  13. PROCUREMENT AND CONTRACT MANAGEMENT

    CERN Multimedia

    Training & Development Group; Linda Orr-Easo; Tel. 72460; Nathalie Dumeaux; Tel. 78144

    2001-01-01

    We are pleased to announce the launch of a new training on: Procurement and Contract Management (This seminar will be run by CERN experts in French or in English) Level 1 The aim is to raise awareness of the key issues involved. Date : 8 June 2001 This level is open to everyone. Participants should register via our Web page as soon as possible. Level 2 To develop the skills needed to effectively manage contracts, from the Technical, Commercial and Legal aspects. Dates : Three days, Autumn 2001 This Level is open to those who are/will be more directly responsible for procurement and contract management. Participants should have followed Level 1. For a description of the seminar, please consult:   Level 1: http://training.web.cern.ch/Training/MANCO/P9798/9-cm_e.htm Level 2: http://training.web.cern.ch/Training/MANCO/P9798/9-cm2_e.htm

  14. Annual Site Environmental Report Prepared for the Department of Energy,under contract number DE-AC03-76SF00515 January - December 2001

    International Nuclear Information System (INIS)

    Russak, Hillary M.

    2003-01-01

    This report provides information about environmental programs during 2001 at the Stanford Linear Accelerator Center (SLAC). Also included are seasonal activities that cross calendar-year divisions. Production of the annual site environmental report (ASER) is a requirement established by the US Department of Energy (DOE) for all management and operating (M and O) contractors throughout the DOE complex. SLAC is federally-funded, research development center with Stanford University as the M and O contractor. The most noteworthy information in this report is summarized in this section. This summary demonstrates the effective application of SLAC environmental management in meeting the site's Integrated Safety Management System (ISMS) goals. For normal daily activities, all SLAC managers and supervisors are responsible for ensuring that proper procedures are followed to meet the ISMS goals: Worker safety and health are protected; The environment is protected; and Compliance is assured. Throughout 2001, SLAC focused on these activities through the SLAC management systems. These systems were also the ways SLAC approached implementing the ''Greening of the Government'' initiatives (such as Executive Order 13148). The management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. SLAC did not receive any notices of violation during 2001. In addition, many improvements were continued during 2001, including improvements in the storm drain system, improved ground water monitoring capabilities, and enhancements to the system to manage the generation of mixed wastes. Environmental program-specific summary details are shown below

  15. Annual Site Environmental Report Prepared for the Department of Energy,under contract number DE-AC03-76SF00515 January - December 2001

    Energy Technology Data Exchange (ETDEWEB)

    Russak, Hillary M.

    2003-05-06

    This report provides information about environmental programs during 2001 at the Stanford Linear Accelerator Center (SLAC). Also included are seasonal activities that cross calendar-year divisions. Production of the annual site environmental report (ASER) is a requirement established by the US Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is federally-funded, research development center with Stanford University as the M and O contractor. The most noteworthy information in this report is summarized in this section. This summary demonstrates the effective application of SLAC environmental management in meeting the site's Integrated Safety Management System (ISMS) goals. For normal daily activities, all SLAC managers and supervisors are responsible for ensuring that proper procedures are followed to meet the ISMS goals: Worker safety and health are protected; The environment is protected; and Compliance is assured. Throughout 2001, SLAC focused on these activities through the SLAC management systems. These systems were also the ways SLAC approached implementing the ''Greening of the Government'' initiatives (such as Executive Order 13148). The management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. SLAC did not receive any notices of violation during 2001. In addition, many improvements were continued during 2001, including improvements in the storm drain system, improved ground water monitoring capabilities, and enhancements to the system to manage the generation of mixed wastes. Environmental program-specific summary details are shown below.

  16. Learning Contracts in Undergraduate Courses: Impacts on Student Behaviors and Academic Performance

    Science.gov (United States)

    2013-04-01

    they "felt bound and obligated by the mutual expectations," and the learning contract motivated them to complete readings on time ( Lemieux , 2001...1974; Huff and Johnson, 1998; Williams and Williams, 1999; Chan and Wai-tong, 2000; Lemieux , 2001; Chyung, 2007; Litchfield, et al., 2007; O’Halloran...were required to sign a contract (e.g. Barlow, 1974; Huff and Johnson, 1998; Williams and Williams, 1999; Chan and Wai-tong, 2000; Lemieux 2001

  17. 2001 activity report

    International Nuclear Information System (INIS)

    2002-01-01

    Managing radioactive waste for a better control in the future. The Quadrennial State/Andra contract, the double ISO 9001 (quality) and ISO 140001 (environment) certification and three diversified missions: industry, research and information. Those are the highlights of the activity report where the reader will be able to learn more about the Agency's major achievements in 2001. An appendix contains the management report of the Agency

  18. 75 FR 29547 - Federal Acquisition Regulation; Information Collection; Contract Financing

    Science.gov (United States)

    2010-05-26

    ...; Information Collection; Contract Financing AGENCIES: Department of Defense (DoD), General Services... previously approved information collection requirement concerning contract financing. Public comments are... substantially changed the statutory authorities for Government financing of contracts. Sections 2001(f) and 2051...

  19. Slovak Institute of Metrology. Annual Report 2001

    International Nuclear Information System (INIS)

    Bily, M.

    2002-03-01

    A brief account of activities carried out by the Slovak Institute of Metrology (SMU) in 2001 is presented. These activities are reported under the headings: (1) Organisation identification; (2) Mission and medium-term perspectives; (3) Contract with Slovak Office of Standards, Metrology and Testing of the Slovak Republic; (4) SMU activities ; (5) Economic results; (6) Personnel management; (7) Aims and results of their fulfilment; (8) Evaluation and analysis of SMU development in 2001; (9) Main group of outputs users; (10) Conclusion

  20. Plan Assurance Qualité for an Installation Contract

    OpenAIRE

    Gascon, C

    2001-01-01

    The current ST/EL group's installation and maintenance contract expires on June 2001. Official procedures for a new contract began a few months ago. Once the new contract has been adjudicated, contractor firm should establish a Quality Assurance Plan (PAQ) within 6 months to be approved. This PAQ is the essential main instrument which ST/EL group has in order to assure a perfect achievement of signed contract. PAQ efficiency depends on its good knowledge and its permanent application on the p...

  1. 76 FR 4112 - Federal Acquisition Regulation; Submission for OMB Review; Contract Financing

    Science.gov (United States)

    2011-01-24

    ...; Submission for OMB Review; Contract Financing AGENCIES: Department of Defense (DOD), General Services... approved information collection requirement concerning contract financing. A notice was published in the... substantially changed the statutory authorities for Government financing of contracts. Sections 2001(f) and 2051...

  2. 75 FR 67164 - Proposed Collection; Comment Request for Revenue Procedure 2001-42

    Science.gov (United States)

    2010-11-01

    ... Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning Revenue Procedure 2001-42, Modified Endowment Contract Correction Program Extension... Internet, at [email protected] . SUPPLEMENTARY INFORMATION: Title: Modified Endowment Contract...

  3. Final Technical Report for contract number DE-FG02-05ER15670

    Energy Technology Data Exchange (ETDEWEB)

    Glazebrook, Jane [Univ. of Minnesota, Minneapolis, MN (United States)

    2016-02-29

    This is the final technical report for contract number DE-FG02-05ER15670. The project is now complete, and results of the project have been published. Two papers were published based on work done in the last three-year funding period. The DOIs of these papers are included below. The abstracts of the papers, providing summaries of the work, are included in the body of the report.

  4. Plan Assurance Qualité for an Installation Contract

    CERN Document Server

    Gascon, C

    2001-01-01

    The current ST/EL group's installation and maintenance contract expires on June 2001. Official procedures for a new contract began a few months ago. Once the new contract has been adjudicated, contractor firm should establish a Quality Assurance Plan (PAQ) within 6 months to be approved. This PAQ is the essential main instrument which ST/EL group has in order to assure a perfect achievement of signed contract. PAQ efficiency depends on its good knowledge and its permanent application on the part of the contractor firm and especially on the part of ST/EL group. The acquired experience during last PAQ should be reflected in the future contract.

  5. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 87

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    Approximately 30 research projects are summarized in this report. Title of the project, contract number, company or university, award amount, principal investigators, objectives, and summary of technical progress are given for each project. Enhanced oil recovery projects include chemical flooding, gas displacement, and thermal recovery. Most of the research projects though are related to geoscience technology and reservoir characterization.

  6. Team incentives in relational contracts

    International Nuclear Information System (INIS)

    Kvaloey, Ola

    2003-01-01

    Incentive schemes for teams are compared. I ask: under which conditions are relational incentive contracts based on joint performance evaluation, relative performance evaluation and independent performance evaluation self-enforceable. The framework of Che and Yoo (2001) on team incentives is combined with the framework of Baker, Gibbons and Murphy (2002) on relational contracts. In a repeated game between one principal and two agents, I find that incentives based on relative or independent performance are expected to dominate when the productivity of effort is high, while joint performance evaluation dominates when productivity is low. Incentives based on independent performance are more probable if the agents own critical assets. (author)

  7. Proposal for the award of an industrial services contract for computer centre operations

    CERN Document Server

    2001-01-01

    This document concerns the award of an Industrial Services contract for Computer Centre operations. Following a market survey carried out among 40 firms in eleven Member States, a call for tenders (IT-2871/IT) was sent on 9 March 2001 to nine firms and one consortium consisting of two firms in six Member States. By the closing date, CERN had received three tenders from two firms and one consortium in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium DCS (CH) - INTRASOFT (GR), the lowest bidder, for an initial period of three years from 1 October 2001 for a total amount of 2 196 588 Swiss francs, not subject to revision until 30 September 2002. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH-55% ; GR-45%.

  8. The role of market orientation in advertising spending during economic collapse : The case of Turkey in 2001

    NARCIS (Netherlands)

    Ozturan, P.; Oszomer, A.; Pieters, R.

    The authors investigate the role of market orientation in advertising spending during economic contraction. They use the 2001 economic collapse in Turkey as the empirical context in which to test hypotheses regarding why some firms increase their advertising spending in a contraction period while

  9. The Role of Market Orientation in Advertising Spending during Economic Collapse: The Case of Turkey in 2001

    NARCIS (Netherlands)

    Ozturan, P.; Ozsomer, A.; Pieters, F.G.M.

    2014-01-01

    The authors investigate the role of market orientation in advertising spending during economic contraction. They use the 2001 economic collapse in Turkey as the empirical context in which to test hypotheses regarding why some firms increase their advertising spending in a contraction period while

  10. The effects of hospitals' governance on optimal contracts: bargaining vs. contracting.

    Science.gov (United States)

    Galizzi, Matteo M; Miraldo, Marisa

    2011-03-01

    We propose a two-stage model to study the impact of different hospitals' governance frameworks on the optimal contracts designed by third-party payers when patients' disease severity is the private information of the hospital. In the second stage, doctors and managers interact within either a bargaining or a contracting scenario. In the contracting scenario, managers offer a contract that determines the payment to doctors, and doctors decide how many patients to treat. In the bargaining scenario, doctors and managers strategically negotiate on both the payment to doctors and the number of patients to treat. We derive the equilibrium doctors' payments and number of treated patients under both scenarios. We then derive the optimal contract offered by the government to the hospital in the first stage. Results show that when the cost of capital is sufficiently low, the informational rent is lower, and the social welfare is higher, in the contracting scenario. Copyright © 2010 Elsevier B.V. All rights reserved.

  11. 24 CFR 983.203 - HAP contract information.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract information. 983.203... DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.203 HAP contract information. The HAP contract must specify: (a) The total number of contract units by number of bedrooms; (b...

  12. Determinants of Service Contract Outcomes

    Science.gov (United States)

    2011-04-30

    5–24. Armstrong, J. S., & Overton, T. S. (1977). Estimating nonresponse bias in mail surveys. Journal of Marketing Research , 14(3), 396–402. Ausink...for developing better measures of marketing constructs. Journal of Marketing Research , 16(1), 64–73. Coalition of Service Industries (CSI). (2007...with unobservable variables and measurement error. Journal of Marketing Research , 18, 39–50. GAO. (2001a, May). Contract management: Trends and

  13. Why radiologists lose their hospital contracts: is your contract secure?

    Science.gov (United States)

    Muroff, Lawrence R

    2010-03-01

    Previously, a hospital contract meant tenure for the incumbent group of radiologists; however, those days are long gone. Exclusive contracts have morphed into exclusive contracts with carve-outs. Turf erosion has become a fact of life for radiology practices. Now radiologists are losing their hospital contracts in record numbers. Group size, though helpful for a variety of reasons, does not ensure that a practice will be secure in its hospital setting. The reasons that groups lose their hospital contracts are varied, and in this paper, the author discusses the most common ones. Suggestions to help practices avoid this unfortunate fate are presented.

  14. Co-ordinated Research Projects (CRPs): Annual report of activities and statistics for 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-15

    , international and Agency scientific and technical publications (TECDOCs). In certain cases the research results are directly relevant to implementation of projects in the Agency's Technical Co-operation Programme. In terms of number of awards and degree of funding, CRPs constitute a significant activity within the Agency's programmes. 932 contracts and agreements were awarded arising of the 1371 contract and agreement proposals received by the Agency during 2001. In 2001, $6,199,104 were awarded from the regular budget to institutes under contractual arrangements and to fund Research Co-ordination Meetings (RCMs). Additionally, $241,901 of extra-budgetary contributions was used to fund additional contracts and RCMs. Thus, total awards amounted to $6,441,005. The average award per contract was $5,800.

  15. Co-ordinated Research Projects (CRPs): Annual report of activities and statistics for 2001

    International Nuclear Information System (INIS)

    2002-07-01

    , international and Agency scientific and technical publications (TECDOCs). In certain cases the research results are directly relevant to implementation of projects in the Agency's Technical Co-operation Programme. In terms of number of awards and degree of funding, CRPs constitute a significant activity within the Agency's programmes. 932 contracts and agreements were awarded arising of the 1371 contract and agreement proposals received by the Agency during 2001. In 2001, $6,199,104 were awarded from the regular budget to institutes under contractual arrangements and to fund Research Co-ordination Meetings (RCMs). Additionally, $241,901 of extra-budgetary contributions was used to fund additional contracts and RCMs. Thus, total awards amounted to $6,441,005. The average award per contract was $5,800

  16. CONTRACT FOLLOW UP TRAINING

    CERN Multimedia

    Technical Training; Tel. 74460

    2001-01-01

    SPL is organizing Training Sessions on the Contract Follow Up application. CFU is a Web based tool, developped and supported by the Administrative Information Services. It allows the creation of Divisional Requests and the follow up of their processing, from the Market Survey to the Invitation to Tender or Price Enquiry, approval by the Finance Committee, up to the actual signature of a Contract, acccording to the CERN Purchasing procedures. It includes a document management component. It also provides link with other AIS applications such as BHT and EDH. The course is primarily intended for DPOs, Contract Technical responsibles in the division and their assistants, but is beneficial to anybody involved in the follow up of such Purchasing Procedures. This course is free of charge, but application is necessary. The details of the course may be found at http://training.web.cern.ch/Training/ENSTEC/P2001/Bureautique/cfu4_f.htm General information of CFU may be found at http://ais.cern.ch/apps/cfu/ The dates of t...

  17. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 83, quarter ending June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    Summaries of 41 research projects on enhanced recovery are presented under the following sections: (1) chemical flooding; (2) gas displacement; (3) thermal recovery; (4) geoscience technology; (5) resource assessment technology; and (6) reservoir classes. Each presentation gives the title of the project, contract number, research facility, contract date, expected completion data, amount of the award, principal investigator, and DOE program manager, and describes the objectives of the project and a summary of the technical progress.

  18. Annual report 2001. General direction of energy and raw materials; Rapport annuel 2001. Direction generale de l'energie et des matieres premieres

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This report summarizes the 2001 activity of the French general direction of energy and raw materials (DGEMP) of the ministry of finances and industry: 1 - security of energy supplies: a recurrent problem; 2001, a transition year for nuclear energy worldwide; petroleum refining in font of the 2005 dead-line; the OPEC and the upset of the oil market; the pluri-annual planning of power production investments; renewable energies: a reconfirmed priority; 2 - the opening of markets: the opening of French electricity and gas markets; the international development of Electricite de France (EdF) and of Gaz de France (GdF); electricity and gas industries: first branch agreements; 3 - the present-day topics: 2001, the year of objective contracts; AREVA, the future to be prepared; the new IRSN; the agreements on climate and the energy policy; the mastery of domestic energy consumptions; the safety of hydroelectric dams; Technip-Coflexip: the birth of a para-petroleum industry giant; the cleansing of the mining activity in French Guyana; the future of workmen of Lorraine basin coal mines; 4 - 2001 at a glance: highlights; main legislative and regulatory texts; 5 - DGEMP: November 2001 reorganization and new organization chart; energy and raw materials publications; www.industrie.gouv.fr/energie. (J.S.)

  19. Production and Productivity Effects of Informal Contract Farming in ...

    African Journals Online (AJOL)

    This paper uses data from a 2001 household survey of small-scale farming households in Kirinyaga District, Kenya to explore production effects of informal credit contracts in French bean farming where formal markets for surplus production are seemingly shallow and imperfect. Specifically, it examines whether informal ...

  20. Annual report 2001. General direction of energy and raw materials; Rapport annuel 2001. Direction generale de l'energie et des matieres premieres

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This report summarizes the 2001 activity of the French general direction of energy and raw materials (DGEMP) of the ministry of finances and industry: 1 - security of energy supplies: a recurrent problem; 2001, a transition year for nuclear energy worldwide; petroleum refining in font of the 2005 dead-line; the OPEC and the upset of the oil market; the pluri-annual planning of power production investments; renewable energies: a reconfirmed priority; 2 - the opening of markets: the opening of French electricity and gas markets; the international development of Electricite de France (EdF) and of Gaz de France (GdF); electricity and gas industries: first branch agreements; 3 - the present-day topics: 2001, the year of objective contracts; AREVA, the future to be prepared; the new IRSN; the agreements on climate and the energy policy; the mastery of domestic energy consumptions; the safety of hydroelectric dams; Technip-Coflexip: the birth of a para-petroleum industry giant; the cleansing of the mining activity in French Guyana; the future of workmen of Lorraine basin coal mines; 4 - 2001 at a glance: highlights; main legislative and regulatory texts; 5 - DGEMP: November 2001 reorganization and new organization chart; energy and raw materials publications; www.industrie.gouv.fr/energie. (J.S.)

  1. Pacta sunt servanda versus the social role of contracts: the case of Brazilian agriculture contracts

    Directory of Open Access Journals (Sweden)

    Christiane Leles Rezende

    2012-06-01

    Full Text Available This study explores the instability created by contradictory court decisions related with contract breaches. Forward marketing contracts represent an important source of resources to finance Brazilian agriculture, however a large number of contract breaches were observed during a period of marked increase in soy prices. The study analyzed 161 judicial appeal decisions and a survey was carried with 70 farmers. The results show the difference of judges' interpretation and the existence of second order effects. The effects of court decisions were more requirements of guarantees and the reduction in the number of contracts. Those soybean farmers who did not breach their contracts have also been negatively affected by the strategic reactions of trading and processing companies. The concept of "social function of the contract" introduced in Brazilian civil code led to a higher degree of instability in contracts, raising transaction costs and motivating private economic sanctions.

  2. The DISAM Journal of International Security Assistance Management. Volume 23, Number 3, Spring 2001

    Science.gov (United States)

    2001-01-01

    there are rights and freedoms to which every human is entitled, no matter where he or she lives. In this issue we offer the introduction to the report...Assistance Management INTRODUCTION The last DISAM Journal, Winter 2000/2001 Edition, provided an extensive description and analysis of the numerous...FY2001 Country/Program by ESF Budget ESF Geographical Region Funding Request Funding Partnerships to Eliminate Sweatshops 4.000 5.000 3.986 Environmental

  3. Improving the repeatability of Motor Unit Number Index (MUNIX) by introducing additional epochs at low contraction levels.

    Science.gov (United States)

    Peng, Yun; Zhang, Yingchun

    2017-07-01

    To evaluate the repeatability of (Motor Unit Number Index) MUNIX under repeatability conditions, specify the origin of variations and provide strategies for quality control. MUNIX calculations were performed on the bicep brachii muscles of eight healthy subjects. Negative effect of suboptimal electrode positions on MUNIX accuracy was eliminated by employing the high-density surface electromyography technique. MUNIX procedures that utilized a variety of surface interferential pattern (SIP) epoch recruitment strategies (including the original MUNIX procedure, two proposed improvement strategies and their combinations) were described. For each MUNIX procedure, ten thousands of different SIP pools were constructed by randomly recruiting necessary SIP epochs from a large SIP epoch pool (3 datasets, 9 independent electromyography recordings at different contraction levels per dataset and 10 SIP epochs per recording) and implemented for MUNIX calculation. The repeatability of each MUNIX procedure was assessed by summarizing the resulting MUNIX distribution and compared to investigate the effect of SIP epoch selection strategy on repeatability performance. SIP epochs selected at lower contraction levels have a stronger influence on the repeatability of MUNIX than those selected at higher contraction levels. MUNIX under repeatability conditions follows a normal distribution and the standard deviation can be significantly reduced by introducing more epochs near the MUNIX definition line. The MUNIX technique shows an inherent variation attributable to SIP epochs at low contraction levels. It is recommended that more epochs should be sampled at these low contraction levels to improve the repeatability. The present study thoroughly documented the inherent variation of MUNIX and the causes, and offered practical solutions to improve the repeatability of MUNIX. Copyright © 2017 International Federation of Clinical Neurophysiology. Published by Elsevier B.V. All rights reserved.

  4. Annual report 2001. General direction of energy and raw materials

    International Nuclear Information System (INIS)

    2001-01-01

    This report summarizes the 2001 activity of the French general direction of energy and raw materials (DGEMP) of the ministry of finances and industry: 1 - security of energy supplies: a recurrent problem; 2001, a transition year for nuclear energy worldwide; petroleum refining in font of the 2005 dead-line; the OPEC and the upset of the oil market; the pluri-annual planning of power production investments; renewable energies: a reconfirmed priority; 2 - the opening of markets: the opening of French electricity and gas markets; the international development of Electricite de France (EdF) and of Gaz de France (GdF); electricity and gas industries: first branch agreements; 3 - the present-day topics: 2001, the year of objective contracts; AREVA, the future to be prepared; the new IRSN; the agreements on climate and the energy policy; the mastery of domestic energy consumptions; the safety of hydroelectric dams; Technip-Coflexip: the birth of a para-petroleum industry giant; the cleansing of the mining activity in French Guyana; the future of workmen of Lorraine basin coal mines; 4 - 2001 at a glance: highlights; main legislative and regulatory texts; 5 - DGEMP: November 2001 reorganization and new organization chart; energy and raw materials publications; www.industrie.gouv.fr/energie. (J.S.)

  5. Transnational Law of Public Contracts

    NARCIS (Netherlands)

    Audit, M.; Schill, S.W.

    2016-01-01

    Public contracts were traditionally conceived as instruments of domestic public law and used within markets confined to the territory of the state party to the contract. Globalization, however, subjects public contracting to an increasing number of processes that take place at a transnational level

  6. 78 FR 22034 - Proposed Collection; Comment Request for Notice 2001-1

    Science.gov (United States)

    2013-04-12

    ... Notice 2001-1, Employer-designed Tip Reporting Program for the Food and Beverage Industry (EmTRAC). DATES... Program for the Food and Beverage Industry (EmTRAC). OMB Number: 1545-1716. Notice Number: Notice 2001-1...

  7. 75 FR 39034 - Public Housing Annual Contributions Contract

    Science.gov (United States)

    2010-07-07

    ... Contributions Contract AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: The... Contributions Contract (ACC) with certain requirements applicable to all project and other requirements... Contributions Contract. OMB Approval Number: 2577-New. Form Numbers: Certain information collections do not have...

  8. Effect of land cover change on runoff curve number estimation in Iowa, 1832-2001

    Science.gov (United States)

    Wehmeyer, Loren L.; Weirich, Frank H.; Cuffney, Thomas F.

    2011-01-01

    Within the first few decades of European-descended settlers arriving in Iowa, much of the land cover across the state was transformed from prairie and forest to farmland, patches of forest, and urbanized areas. Land cover change over the subsequent 126 years was minor in comparison. Between 1832 and 1859, the General Land Office conducted a survey of the State of Iowa to aid in the disbursement of land. In 1875, an illustrated atlas of the State of Iowa was published, and in 2001, the US Geological Survey National Land Cover Dataset was compiled. Using these three data resources for classifying land cover, the hydrologic impact of the land cover change at three points in time over a period of 132+ years is presented in terms of the effect on the area-weighted average curve number, a term commonly used to predict peak runoff from rainstorms. In the four watersheds studied, the area-weighted average curve number associated with the first 30 years of settlement increased from 61·4 to 77·8. State-wide mapped forest area over this same period decreased 19%. Over the next 126 years, the area-weighted average curve number decreased to 76·7, despite an additional forest area reduction of 60%. This suggests that degradation of aquatic resources (plants, fish, invertebrates, and habitat) arising from hydrologic alteration was likely to have been much higher during the 30 years of initial settlement than in the subsequent period of 126 years in which land cover changes resulted primarily from deforestation and urbanization. 

  9. Proposal for the renegotiation of a contract for the supply of eight coil casings for the barrel toroid magnet of the ATLAS detector

    CERN Document Server

    2001-01-01

    This document concerns the renegotiation of a contract for the supply of eight coil casings for the Barrel Toroid Magnet of the ATLAS detector. The proposal for the award of a contract with ABB ENERTECH (CH) was presented to Finance Committee for information in September 1998 (CERN/FC/4089). In view of the developments outlined in this document, the Finance Committee is invited to agree to the renegotiation of a contract with ALSTOM SWITZERLAND (CH), for the supply of eight coil casings for the ATLAS Barrel Toroid Magnet for a total Ex-works price of 12 580 000 Swiss francs, subject to revision after 31 July 2001, with an option for an extra coil casing for an additional Ex-works price of 1 525 000 Swiss francs, subject to revision after 31 July 2001, bringing the total amount for the supply to 14 105 000 Swiss francs, subject to revision after 31 July 2001. The total amount of the contract, including transport to the integration site, will not exceed 14 490 000 Swiss francs, subject to revision after 31 July...

  10. Scientific evaluation on the NKS programme 1998-2001; Facklig utvaerdering av NKS-programmet 1998-2001

    Energy Technology Data Exchange (ETDEWEB)

    Loewenhielm, G. [Swedish Radiation Protection Authority, SSI (Sweden); Mustonen, R. [Radiation and Nuclear Safety Authority, STUK (Finland)

    2002-11-01

    The Board of the Nordic Nuclear Safety Research (NKS) decided in the autumn 2000 to contract out two separate evaluations on the NKS Programme 1998-2001. Martin Oeiby from the NorwegiOe Radiation Protection Authority was requested to perform an evaluation on overall administration of the NKS Programme. Two experts conducted the scientific evaluation. Gustaf Lowenhielm from the Swedish Nuclear Power Inspectorate was requested to assess projects on nuclear safety issues and waste management, and Raimo Mustonen from the Finnish Radiation and Nuclear Safety Authority to evaluate projects on radiation protection and nuclear emergency preparedness. This report deals with the scientific evaluation. The report contains brief review on the history of the Nordic nuclear and radiation safety co-operation and on the development of Programme for 1998-2001. Brief summaries of activities in all the projects are given, together with the main results of the projects. The evaluators give their subjective assessments on the success and effectiveness of the projects based on the evaluation criteria agreed With the NKS Board in the beginning of work. Also some general recommendations for the future co-operation are given. (au)

  11. CSIR Technology Impact 2001

    CSIR Research Space (South Africa)

    CSIR

    2001-01-01

    Full Text Available This issue of Technology Impact offers a brief snapshot of CSIR activities during the year under review (1 March 2000 - 28 February 2001) by highlighting a number of innovative projects and initiatives in these areas. It present a rich canvas...

  12. Determinants of the number of bidders in the competitive procurement of electricity supply contracts in the Japanese public sector

    International Nuclear Information System (INIS)

    Hattori, Toru

    2010-01-01

    Since the electricity retail market in Japan was partially opened to competition in 2000, many government entities have sought to solicit competing bids for the electricity supply to their office buildings or facilities, encouraging competition between the incumbents and new entrants. However, in many cases, only the incumbent utility bids for the contract and the competitive effects are limited. This paper presents a statistical analysis of bidders' participation in competitive procurement. We employ several count data regression models to explain the number of bidders other than the local electric utility. Our results suggest that the number of bidders would decrease in response to an increase in the load factor, perhaps because the new entrants are less competitive in serving customers with high load factors as they do not operate low-cost base-load power plants such as nuclear power plants; It would increase along with the voltage level and contract demand. The results also indicate that new entrants are more likely to participate in the bidding process in large city areas. (author)

  13. Research nuclear reactor RA, Annual Report 2001

    International Nuclear Information System (INIS)

    Sotic, O.

    2002-01-01

    During 2001, activities at the RA research nuclear reactor in were performed according to the Contract about financing of the RA reactor for the period January-December 2001, signed by the Ministry of Science, technology and development of the Republic of Serbia. RA reactor was not operated since shutdown in August 1984. Although, the most of the planned reconstruction activities were finished until 1991, the most important, which was concerned with exchange of the reactor instrumentation, financed by the IAEA, was interrupted due to international sanctions imposed on the country. Since 1992, all the renewal and reconstruction activities were ceased. Continuous aging and degradation of the equipment and facilities demand decision making about the future status of the Ra reactor. Until this decision is made it is an obligation to maintain control and maintenance of ventilation system, power supply, internal transportation system, spent fuel storage, hot cells, electronic fuel surveillance system, and part of the stationary dosimetry system. In 2001, apart from the mentioned activities, actions were undertaken related to maintenance of the reactor building and installations. The most important tasks fulfilled were: protection of the roof of the ventilation system building, purchase and installing the fire protection system and twelve new battery cells in the reactor building. There were no actions concerned with improvement of the conditions for intermediate spent fuel storage. With the support of IAEA, actions were initiated for possible transport of the spent fuel tu Russia. At the end of 2001, preparations were started for possible future decommissioning of the RA reactor. After, renewal of the membership of our country in the IAEA, the Government of Yugoslavia has declared its attitude about the intention of RA reactor decommissioning at the General Conference in September 2001 [sr

  14. Dynamic Expansion and Contraction of cagA Copy Number in Helicobacter pylori Impact Development of Gastric Disease

    Directory of Open Access Journals (Sweden)

    Sungil Jang

    2017-02-01

    Full Text Available Infection with Helicobacter pylori is a major risk factor for development of gastric disease, including gastric cancer. Patients infected with H. pylori strains that express CagA are at even greater risk of gastric carcinoma. Given the importance of CagA, this report describes a new molecular mechanism by which the cagA copy number dynamically expands and contracts in H. pylori. Analysis of strain PMSS1 revealed a heterogeneous population in terms of numbers of cagA copies; strains carried from zero to four copies of cagA that were arranged as direct repeats within the chromosome. Each of the multiple copies of cagA was expressed and encoded functional CagA; strains with more cagA repeats exhibited higher levels of CagA expression and increased levels of delivery and phosphorylation of CagA within host cells. This concomitantly resulted in more virulent phenotypes as measured by cell elongation and interleukin-8 (IL-8 induction. Sequence analysis of the repeat region revealed three cagA homologous areas (CHAs within the cagA repeats. Of these, CHA-ud flanked each of the cagA copies and is likely important for the dynamic variation of cagA copy numbers. Analysis of a large panel of clinical isolates showed that 7.5% of H. pylori strains isolated in the United States harbored multiple cagA repeats, while none of the tested Korean isolates carried more than one copy of cagA. Finally, H. pylori strains carrying multiple cagA copies were differentially associated with gastric disease. Thus, the dynamic expansion and contraction of cagA copy numbers may serve as a novel mechanism by which H. pylori modulates gastric disease development.

  15. The Relationship between the Employment Contract and other Civil Contracts

    Directory of Open Access Journals (Sweden)

    Răzvan Radu Popescu

    2015-05-01

    Full Text Available The employment relationship is a contractual one and as such must have all the basic elements of an enforceable contract to make it legally binding. In strict contractual terms, the offer is made by the employer and formally accepted by the employee. Once the acceptance has taken place, there is a legally binding agreement and an action will lie against the party who breaches that agreement, even though it may only just have come into existence. An employment contract, however, is unlike most other contracts. Although the parties will have negotiated the main terms, we shall see that a large number of terms will be implied into the agreement from all sorts of different sources and will not have been individually negotiated by the parties at all. This is what makes an employment contract so different from other contracts. We think this article is an important step in the disclosure of the problem eraised by these two concepts.

  16. Collation of data on applicants, offers, acceptances, students and graduates in veterinary science in Australia 2001-2013.

    Science.gov (United States)

    Smyth, G B

    2016-01-01

    To collate data on the numbers of applications, offers, acceptances, students and graduates at Australian veterinary schools between 2001 and 2013. Data were obtained from the Australian Department of Education, the Australian Bureau of Statistics, Graduate Careers Australia and the Australian Veterinary Association Ltd. The number of eligible applicants for veterinary science courses increased from 1540 in 2001 to 2243 in 2013 (46% increase). Offers for places ranged from 400 in 2001 to 643 in 2013 (61% increase) and acceptances ranged from 254 in 2001 to 457 in 2013 (80% increase).The total number of students enrolled ranged from 1641 in 2001 to 3036 in 2013 (85% increase). Female students increased from 1195 in 2001 to 2340 in 2013 (96% increase) and male students increased from 446 to 696 (56%) over this time period. Domestic students numbered 1411 in 2001 and 2391 in 2013 (69% increase). International students increased from 230 in 2001 to 643 in 2013 (180% increase). Students entering veterinary courses numbered 389 in 2001 and increased to 688 in 2013 (77% increase). Graduates increased from 312 in 2001 to 561 in 2013 (80% increase). Percent of recent veterinary graduates seeking full-time employment was 7.6% in 2001 and increased to 21.2% in 2013. Median starting salaries for veterinary graduates in Australia were A$34,000 in 2001 and A$46,000 in 2013 (35% increase). These data provide additional information about the ongoing increase in the numbers of domestic and international students studying veterinary science at Australian universities. Between 2001 and 2013 the numbers of Australian veterinary students and graduates increased at a greater rate than the Australian population. © 2016 Australian Veterinary Association.

  17. Proposal for the award of an industrial services contract for operation of the hostels, apartments and ancillary premises

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Services contract for operation of the hostels, apartments and ancillary premises run by the CERN Housing Service. Following a market survey carried out among 32 firms in ten Member States, a call for tenders (IT-2404/AS/Rev.) was sent on 5 April 2000 to one firm and three consortia in four Member States. By the closing date, CERN had received tenders from the firm and the three consortia. The Finance Committee is invited to agree to the negotiation of a contract with the consortium VIENNA INTERNATIONAL HOTEL MANAGEMENT (AT) - SEREG (CH), the lowest bidder, for an initial period of five years, to enter into force on 1 January 2001, for a total amount of 6 871 850 Swiss francs, not subject to revision until 31 December 2001. The contract will include an option for two one-year extensions beyond the initial five-year period. The consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH-60%, AT-...

  18. Overview of the adjustable fixed-commitment contract

    International Nuclear Information System (INIS)

    Ankrum, G.T.

    1978-01-01

    This paper discusses a number of key decisions, made by the Administration during the past few weeks, in the area of uranium enrichment contracting. The new AFC contract will afford sufficient contract relief, taking the place of ''Open Seasons''

  19. Drilling contracts and incentives

    International Nuclear Information System (INIS)

    Osmundsen, Petter; Sorenes, Terje; Toft, Anders

    2008-01-01

    Shortages of rigs and personnel have encouraged discussion of designing incentive contracts in the drilling sector. However, for the drilling contracts, there are not a large variety of contract types in use. This article describes and analyses incentives for drilling contractors. These are directly represented by the compensation formats utilised in the present and in the consecutive drilling contracts. Indirectly, incentives are also provided by the evaluation criteria that oil companies use for awarding drilling assignments. Changes in contract format pose a number of relevant questions relating to resource management, and the article takes an in-depth look at some of these. Do evaluation criteria for awarding drilling assignments encourage the development of new technology and solutions? How will a stronger focus on drilling efficiency influence reservoir utilisation?

  20. Annual report of JMTR, No.16. FY2001. April 1, 2001 - March 31, 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-03-01

    During the FY2001 (April 2001 to March 2002), the JMTR (Japan Materials Testing Reactor) was operated in 5 operation cycles (113 days) for irradiation studies on the IASCC of the LWR materials, development of fusion blanket materials, radioisotope productions, and so on. The total number of capsules and hydraulic rabbits irradiated were 105 and 59, respectively. Technology development programs were conducted in the following fields. As concerning to the IASCC studies, an advanced water control system and saturation temperature capsules' were developed and installed in the JMTR, and the performance tests were carried out. Also a crack growth testing device for irradiated specimens was developed and installed in the hot laboratories. An efficient recycle process of {sup 6}Li was developed for the production of pebble type tritium breeder material, and the properties of beryllides were examined, both for the development of fusion reactor blanket. This report summarizes these activities performed in the department of JMTR during the FY2001. (author)

  1. 2005-2008 government-ANDRA quadrennial contract

    International Nuclear Information System (INIS)

    2006-01-01

    Radioactive waste management represents an important field of intervention for public authorities who define and implement the public policy around these wastes. The public policy defines the safety framework of this management with a permanent care in ensuring the protection of people and of the environment. One fundamental step in the definition of the public policy was the vote of the law from December 30, 1991 which led to the creation of the national agency of radioactive wastes (ANDRA). The ANDRA is a public, industrial and commercial agency in charge of the long term management of radioactive wastes. In order to define the orientations of ANDRA's action, a contract was established in the year 2000 and signed in 2001 for the 2001-2004 era. It has consolidated the general framework of the agency's action and defined the goals to be reached. This contractual approach aimed at giving the public agency an accountableness and at defining priorities with respect to the actions to be implemented. (J.S.)

  2. New staff contract policy

    CERN Document Server

    HR Department

    2006-01-01

    Following discussion at TREF and on the recommendation of the Finance Committee, Council approved a new staff contract policy, which became effective on 1 January 2006. Its application is covered by a new Administrative Circular No. 2 (Rev. 3) 'Recruitment, appointment and possible developments regarding the contractual position of staff members'. The revised circular replaces the previous Circulars No. 9 (Rev. 3) 'Staff contracts' and No. 2 (Rev. 2) 'Guidelines and procedures concerning recruitment and probation period for staff members'. The main features of the new contract policy are as follows: The new policy provides chances for long-term employment for all staff recruits staying for four years without distinguishing between those assigned to long-term or short-term activities when joining CERN. In addition, it presents a number of simplifications for the award of ICs. There are henceforth only 2 types of contract: Limited Duration (LD) contracts for all recruitment and Indefinite Contracts (IC) for...

  3. Real - time NASBA detection of strawberry vein banding virus

    Czech Academy of Sciences Publication Activity Database

    Hanzlíková-Vašková, Dana; Špak, Josef; Klerks, M. M.; Schoen, C. D.; Thompson, J. R.; Jelkmann, W.

    2004-01-01

    Roč. 110, - (2004), s. 213-221 ISSN 0929-1873 Grant - others:EU(XE) QLRT-PL99-1553 Institutional research plan: CEZ:AV0Z5051902 Keywords : strawberry virus * detection Subject RIV: EE - Microbiology, Virology Impact factor: 1.384, year: 2004

  4. Women's Leadership in the ACR, 2001-2015.

    Science.gov (United States)

    Patel, Amy K; Fielding, Julia; Macura, Katarzyna J; Applegate, Kimberly E; Zackula, Rosalee; Arleo, Elizabeth Kagan

    2017-06-01

    To assess the trends of women in voluntary leadership roles in the ACR from 2001 to 2015. Retrospective leadership records from 2001 to 2015 were collected from the ACR Membership Database based on member demographics, gender, and participation in leadership roles at the national and state level. Data were sorted by gender and year to assess the proportion of women in each leadership position relative to total member/representation counts. Overall, there were increasing numbers of women represented in ACR leadership. From 2001 to 2015, there were increasing rates of women achieving fellowship in the College (7%-11%), now at parity with male member rates. Representation by women has risen from 7% to 21% for state chapter presidents and from 14% to 18% for state councilors. Comparing rolling 5-year averages from 2001-2005 and 2011-2015 showed statistically significant increases (P leadership roles. Women members of the council steering committee rose from 13% in 2001 to 19% in 2015, peaking at 24% in 2014. The Board of Chancellors (BOC) showed the largest increase in women, from 9% to 33%, with a peak at 37% in 2014. However, no BOC chairs were women, one council speaker was a woman, two women were ACR presidents, and two women were vice presidents. Women's participation in ACR leadership has increased significantly at the state level and in fellowship recognition. Although there are increasing numbers of women on the BOC, top positions remain male-dominated at the national level. Published by Elsevier Inc.

  5. Magnetismo 2001

    Science.gov (United States)

    Cardús, J. O.; Curto, J. J.; Sanclement, E.; Torta, J. M.

    This CD-ROM presents the digital version of the Boletin del Observatorio del Ebro Magnetismo. It contains data obtained in the Magnetic Station of the Ebre Observatory during the year 2001. The structure of the CD-ROM consists of one directory numbered with the year of the measurement. There, it could be found the bulletin as printable sheets (Year.pdf) generate with Adobe Acrobat and data files in plain ASCII text (Year.wdc) readable with any text editor. These data files were compiled according to the data exchange format recommended by the IAGA-2002.

  6. Choreography Synthesis as Contract Agreement

    Directory of Open Access Journals (Sweden)

    Julien Lange

    2013-10-01

    Full Text Available We propose a formal model for distributed systems, where each participant advertises its requirements and obligations as behavioural contracts, and where multiparty sessions are started when a set of contracts allows to synthesise a choreography. Our framework is based on the CO2 calculus for contract-oriented computing, and borrows concepts and results from the session type literature. It supports sessions where the number of participants is not determined beforehand, and keeps CO2's ability to rule out participants that are culpable if contracts are not fulfilled at runtime. We show that we have progress and session fidelity in CO2, as a result of the honesty of participants — i.e., their ability to always adhere to their contracts.

  7. Shell report 2001; Les personnes, la planete, les profits. Shell rapport 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    In 2001, Shell saw mixed results across the social, environmental and economic spectrum. In order to contribute to the sustainable development, the Group is on track towards meeting its target to reduce greenhouse gas emissions to 10 % below 1990 levels by the end of 2002, although there was a significant increase in spill volumes and greenhouse gas emissions rose. Shell has articulated the business case and defined seven principles of sustainable development for use across the Group in business plans and daily operations: generating robust profitability; delivering value to customers; protecting the environment; managing resources; respecting and safeguarding people; benefiting communities; and working with stakeholders. Key points from the Shell Report include: in the framework of Managing, an independent review of the Shell Nigeria Community Development programme and testing of a human rights assessment tool in Shell South Africa and the implementing of a new Diversity and Inclusiveness Standard; in the framework of the economy the cost improvements of 5,1 billion dollars, ahead of target, the second highest earnings ever in difficult market conditions and the election of Shell top brand for fifth year running by motorists; in the framework of the Social, the safety performance, the avoidance of 100 contracts for incompatibility with Shell Business Principles; in the framework of the Environment, the publication of the Fresh water usage report for the first time, the Greenhouse gas emissions, the increase of spills as a result of a small number of incidents including a pipeline rupture in Nigeria and a well blow out in Oman. The economic, environmental and social data of the Shell Report are externally verified. (A.L.B.)

  8. U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies

    Science.gov (United States)

    2011-11-07

    Report No. DODIG-2012-017 November 7, 2011 U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies...Contracting and Gift Policies 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK...HERITAGE AND HISTORY COMMAND SUBJECT: U.S. Naval Academy Officials Did Not Adhere to Contracting and Gift Policies (Report No. DODIG-2012-017) We are

  9. 78 FR 72572 - Operational Contract Support

    Science.gov (United States)

    2013-12-03

    ... contract support (OCS), including OCS program management, contract support integration, and integration of... integration, and the integration of DoD contractor personnel into contingency operations outside the United... significant economic impact on a substantial number of small entities. Public Law 96-511, ``Paperwork...

  10. CTBTO Annual Report 2001

    International Nuclear Information System (INIS)

    2002-04-01

    On 10 September 2001, the Comprehensive Nuclear-Test-Ban Treaty saw the fifth anniversary of its adoption. This is the annual report of the Provisional Technical Secretariat (PTS) of the Preparatory Commission for the Comprehensive Nuclear-Test-Ban Treaty Organization for the same year, which shows significant additional progress made in establishing the verification regime in all its aspects. Since the adoption of the Treaty, the international community has attached a high priority to it and invested significant personnel, financial and technological resources to support it. The intensive work by the staff of the PTS and the cooperation of people working for the Treaty all over the world have brought tangible results. During 2001, considerable achievements were made in the establishment of the International Monitoring System (IMS), which consists of a network of 321 seismic, hydroacoustic, infrasound and radionuclide stations and 16 radionuclide laboratories situated in some ninety countries around the world. By the end of the year 84% of the site surveys for the stations had been completed. Altogether 122 stations in all four technologies have been incorporated into the verification system and 104 additional stations are under construction or in the stage of contract negotiation. The build-up of the International Data Centre (IDC), which is responsible for processing, analysing and reporting on the data received from IMS stations, is proceeding according to a seven phase Progressive Commissioning Plan. In 2001 the IDC completed Phase 4, Initial Testing, and began preparations for full scale testing. The third and last package of the IDC applications software coming from the prototype IDC was installed and entered into operational use, allowing IMS data and high quality IDC products to be provided continuously to the 387 currently authorized users from 53 States Signatories. The installation of the Global Communications Infrastructure - a worldwide, secure

  11. 2001 annual report; Rapport annuel 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This document is the 2001 annual report of the French union of the petroleum industry (UFIP). It summarizes the highlights of the petroleum industry activity in France in 2001 and gives some additional information about the production, refining and distribution of petroleum products in the rest of the world. (J.S.)

  12. Common Fixed Point of Multivalued Generalized φ-Weak Contractive Mappings

    Directory of Open Access Journals (Sweden)

    Behzad Djafari Rouhani

    2010-01-01

    Full Text Available Fixed point and coincidence results are presented for multivalued generalized φ-weak contractive mappings on complete metric spaces, where φ:[0,+∞→[0,+∞ is a lower semicontinuous function with φ(0=0 and φ(t>0 for all t>0. Our results extend previous results by Zhang and Song (2009, as well as by Rhoades (2001, Nadler (1969, and Daffer and Kaneko (1995.

  13. Habitat restoration/enhancement Fort Hall Reservation : 2001 annual report

    International Nuclear Information System (INIS)

    Moser, David C.

    2003-01-01

    Habitat enhancement, protection and monitoring were the focus of the Resident Fisheries Program during 2001. Enhancement and protection included sloping, fencing and planting willows at sites on Diggie Creek, Clear Creek and Spring Creek. In addition, many previously constructed instream structures (rock barbs and wing dams) were repaired throughout the Fort Hall Indian Reservation (Reservation). In 2001, exclosure fences were erected on Diggie Creek (250 m barbed wire; (70 m jack), Wood Creek (500 m jack), Clear Creek (20 m jack), Ross Fork Creek (200 m jack), West Fork Creek (200 m jack)) and the Portneuf River (1 km barbed wire; 100 m jack). Jack and rail exclosure fences that had deteriorated over the past ten years were repaired at numerous areas throughout the Reservation. Physical sampling during 2001 included sediment and depth surveys (SADMS) in Big Jimmy Creek and Diggie Creek. SADMS, used to track changes in channel morphology and specifically track movements of silt through Bottoms stream systems were completed for eight and nine strata in the Big Jimmy and Diggie Creek, respectively. Baseline SADM data was collected in Diggie Creek to monitor the effects of bank sloping and revegetation on channel morphology and sediment levels through time. Water temperature was monitored (hourly) in Spring Creek, Clear Creek, Ross Fork Creek and Big Jimmy Creek. Biotic sampling included invertebrate sampling in the 200 and 300 series of Clear Creek. Fish population densities and biomass were sampled in Clear Creek 200 and 300 series. Sampling protocols were identical to methods used in past years. Numbers of fish in Clear Creek 300 series remained similar to 2000 while numbers of fish in Clear Creek 200 series dropped to near pre project levels. Salmonid fry densities were monitored near Broncho Bridge and were significantly higher than 2000. A mark-recapture study was initiated in spring 2001 to estimate numbers of spawning adults using the Head End of Spring Creek

  14. 41 CFR 105-1.109 - Numbering.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Numbering. 105-1.109 Section 105-1.109 Public Contracts and Property Management Federal Property Management Regulations System (Continued) GENERAL SERVICES ADMINISTRATION 1-INTRODUCTION 1.1-Regulations System § 105-1.109 Numbering. ...

  15. Outlook 2001

    International Nuclear Information System (INIS)

    Anon

    2000-01-01

    ABARE's Executive Director, Brian Fisher in his address at the annual assembly of economists and commodity producers (Outlook 2001) indicated that the world economic growth, which is of critical importance to the direction of world commodity prices, is assumed to ease in 2001 but to strengthen in 2002. Yet despite the slower world economic growth he forecast that Australia's commodity exports would rise to be worth $86 billion in 2000-2001 and $89 billion in 2001 - 2002 reflecting a relatively low Australian dollar. The value of commodity exports is then forecast to trend downwards in real terms for the remainder of the outlook period to 2005-2006. In preparing commodity projections ABARE assumed world economic growth to moderate to around 3.4% in 2001, and then strengthen to 3.9%, in 2002 supported by lower interest rates in key economies. Activity in the Australian economy is assumed to remain reasonably firm in the short term. While growth in domestic demand is likely to moderate, export performance is expected to remain strong. There has been a remarkable improvement in Australia's trade performance during the last year. This improvement is expected to continue in the short term. For energy commodities, export earnings are forecast to increase from $18.4 billion in 1999-2000 to $25.1 billion in 2000-2001 before declining to $24.4 billion in 2001-2002

  16. Lower Klickitat Riparian and In-channel Habitat Restoration Project, Annual Report 2001-2002.

    Energy Technology Data Exchange (ETDEWEB)

    Conley, Will

    2003-10-01

    This project focuses on the lower Klickitat River and its tributaries that provide or affect salmonid habitat. The overall goal is to restore watershed health to aid recovery of salmonid stocks in the Klickitat subbasin. An emphasis is placed on restoration and protection of watersheds supporting anadromous fish production, particularly steelhead (Oncorhyncus mykiss) which are listed as 'Threatened' within the Mid-Columbia ESU. Restoration activities are aimed at restoring stream processes by removing or mitigating watershed perturbances and improving habitat conditions and water quality. In addition to steelhead, habitat improvements benefit Chinook (O. tshawytscha) and coho (O. kisutch) salmon, resident rainbow trout, and enhance habitat for many terrestrial and amphibian wildlife species. Protection activities compliment restoration efforts within the subbasin by securing refugia and preventing degradation. Since 90% of the project area is in private ownership, maximum effectiveness will be accomplished via cooperation with state, federal, tribal, and private entities. The project addresses goals and objectives presented in the Klickitat Subbasin Summary and the 1994 NWPPC Fish and Wildlife Program. Feedback from the 2000 Provincial Review process indicated a need for better information management to aid development of geographic priorities. Thus, an emphasis has been placed on database development and a review of existing information prior to pursuing more extensive implementation. Planning and design was initiated on several restoration projects. These priorities will be refined in future reports as the additional data is collected and analyzed. Tasks listed are for the April 1, 2001 to August 31, 2002 contract cycle, for which work was delayed during the summer of 2001 because the contract was not finalized until mid-August 2001. Accomplishments are provided for the September 1, 2001 to August 31, 2002 reporting period. During this reporting period

  17. Contract theory and EU Contract Law

    OpenAIRE

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories are largely irreconcilable with the contract law of the EU. The paper further addresses the main implications of this mismatch, both for contract theory and for EU contract law. It suggests that in...

  18. Contract policy for CERN staff members

    CERN Multimedia

    HR Department

    2009-01-01

    Public information meeting on Monday 28 September 2009 at 10.00 a.m. With effect from 1 August 2009, new provisions regarding staff employment contract policy have entered into force. These provisions are set out in: The Staff Rules and Regulations and Administrative Circular No. 2 (Rev. 4). Further details are available in: Frequently Asked Questions. The new provisions are outlined below: Limited-duration contracts From 1 August 2009, limited-duration contracts will be awarded for a maximum period of five years (instead of four years previously) and no extensions beyond five years will be granted. Contracts for periods shorter than five years can be exceptionally awarded, e.g. for a project whose mission or financial resources are time-limited. Indefinite contracts : award procedure A number of changes have been introduced regarding the procedure for the award of indefinite contracts. From now on, posts leading to the award of an indefinite contract will be opened at le...

  19. The contract for the completion and commissioning of Cernavoda NPP - Unit

    International Nuclear Information System (INIS)

    2001-01-01

    On May 18, 2001 the commercial contract for the completion and commissioning of the Cernavoda NPP Unit 2 has been signed by Nuclearelectrica National Company (SNN SA) and its partners, AECL-Canada and ANSALDO-Italy. This contract represents a continuation of the cooperation with AECL-Canada (the owner of the licence and the designer of the nuclear part of Cernavoda NPP Unit1) and ANSALDO-Italy (the designer of the conventional part of Cernavoda NPP Unit1). The completion is scheduled to last for 54 months (4.5 years) since the date the contract takes effect and the nuclear reactor start-up (the first criticality) is scheduled for the 49 th month. The total negotiated cost for the completion was estimated to amount to 689 million dollars, against the 750 million dollars initially estimated. The works at the site will be managed by an integrated staff team of specialized personnel form AECL-Canada (111 positions), ANSALDO-Italy (72 positions) and Romania (1200 positions)

  20. Contract theory and EU Contract Law

    NARCIS (Netherlands)

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories

  1. Group contractions in quantum field theory

    International Nuclear Information System (INIS)

    Concini, C. De; Vitiello, G.

    1979-01-01

    General theorems are given for SU(n) and SO(n). A projective geometry argument is also presented with disclosure of the occurrence a group contraction mechanism as a geometric consequence of spontaneous breakdown of symmetry. It is also shown that a contraction of the conformal group gives account of the number of degrees of freedom of an n-pseudoparticle system in an Euclidean SU(2) gauge invariant Yang-Mills theory, in agreement with the result obtained by algebraic geometry methods. Low-energy theorems and ordered states symmetry patterns are observable manifestations of group contractions. These results seem to support the conjecture that the transition from quantum to classical physics involves a group contraction mechanism. (author)

  2. DETERMINANTS OF GROWTH IN FRANCHISING CONTRACTS IN EMERGING MARKETS; EVIDENCES FROM TURKEY

    Directory of Open Access Journals (Sweden)

    Sitki Sonmezer

    2012-02-01

    Full Text Available This study aims to examine the franchise sector and determine the significant factors that contribute to an increase in the number of franchiser’s contracts in Turkey. Secondary data is used from the Turkish Franchise Association and multivariate regression models are run for each sector. Our models explain the change in the number of franchise contracts with R2’s varying between .6577 and .7549. We provide evidence that success factors in increasing the number of contracts change depending on the sector firms operating in and contracts may be designed thusly to pursue success.

  3. Properties of doped Bi-based superconductors. Final technical report for the contract period June 1, 1997 to May 31, 2001; FINAL

    International Nuclear Information System (INIS)

    Payne, James E.

    2001-01-01

    This report summarizes the results of an extension of grant DE-FG05-93ER45493. The research goal was to have undergraduate students involved in a study of the effects of doping on the properties of BSCCO superconductors. Specifically the students investigated the effects in both bulk samples and in single crystals (whiskers). Of equal importance was the opportunity afforded minority students in a four-year institution to participate in state-of-the-art research and increase the number of students entering graduate school in science, engineering and mathematics. Over 75% of the undergraduates involved with the research enrolled in graduate school. The project in collaboration with Clemson University was able to identify and support an African American graduate student who will receive his doctorate in December of 2001

  4. 75 FR 11632 - Proposed Collection; Comment Request for Notice 2001-1

    Science.gov (United States)

    2010-03-11

    ... comments concerning Notice 2001-1, Employer-designed Tip Reporting Program for the Food and Beverage... Reporting Program for the Food and Beverage Industry (EmTRAC). OMB Number: 1545-1716. Notice Number: Notice...

  5. Poverty Monitor 2001

    NARCIS (Netherlands)

    2001-01-01

    Original title: Armoedemonitor 2001. The Poverty Monitor 2001 (Armoedemonitor 2001) contains the most up-to-date figures on poverty in the Netherlands. The data were collected and analysed by the Netherlands Institute for Social Research/SCP and Statistics Netherlands (CBS). The extent of and

  6. The DISAM Journal of International Security Assistance Management. Volume 23, Number 2, Winter 2001

    Science.gov (United States)

    2001-01-01

    The DISAM Journal, Winter 2001 90 Protection Project to continue its study of international trafficking, prostitution, slavery , debt bondage and other...amounting to debt bondage , involuntary servitude, or slavery . This includes about 50,000 women and children trafficked annually into the U.S. [Section 102...Vietnamese to receive modern demining equipment and other mine- related assistance through the U.S. humanitarian demining program. The Vietnamese will

  7. Non-turnkey contract

    International Nuclear Information System (INIS)

    Shimoyama, Shunji

    1975-01-01

    A turnkey contract is recommended to such a country which is in the initial stage of nuclear power development with respect to a few plants being constructed earlier. The prime contractor may not necessarily be a reactor supplier. In some cases an architect engineering company may be a contractor. If this arrangement is not possible and the contract had to be a non-turnkey type, there might be some advantage to such a developing country capable of undertaking some major portions of the project works. Even if she might face with troubles and difficulties during construction of the first nuclear power station, she might have chance of aquiring technical kowledge and experience which would later enable her to make the plant of her own manufacture. In such a case it is advisable to limit the number of main contracts as small as possible and to utilize an organization to assist the owner in project management or to assume this function in his behalf. (orig./FW) [de

  8. Non-turnkey contract

    Energy Technology Data Exchange (ETDEWEB)

    Shimoyama, S

    1975-01-01

    A turnkey contract is recommended to such a country which is in the initial stage of nuclear power development with respect to a few plants being constructed earlier. The prime contractor may not necessarily be a reactor supplier. In some cases an architect engineering company may be a contractor. If this arrangement is not possible and the contract had to be a non-turnkey type, there might be some advantage to such a developing country capable of undertaking some major portions of the project works. Even if she might face troubles and difficulties during construction of the first nuclear power station, she might have a chance of aquiring technical kowledge and experience which would later enable her to make the plant of her own manufacture. In such a case it is advisable to limit the number of main contracts as small as possible and to utilize an organization to assist the owner in project management or to assume this function in his behalf.

  9. Types of contracts and contracting procedures

    International Nuclear Information System (INIS)

    Zijl, N.A. van

    1977-01-01

    Contracting for a nuclear power plant can be carried out in many different ways, from a bilateral agreement between two countries to an international open bidding competition. Also the kind of contracts (turnkey, split-package or multi-contract type) are discussed with their pros and cons as well as the contracting procedures which can be followed to come to the conclusion of a contract. (orig.) [de

  10. REVIEW OF CATARACT SURGERY FROM 1998 TO 2001 AT THE MURSKA SOBOTA GENERAL HOSPITAL EYE DEPARTMENT

    Directory of Open Access Journals (Sweden)

    Mitja Šterman

    2003-05-01

    Full Text Available Background. Cataract is a leading cause of a reversible blindness in a developed world. The number of cataract surgery procedures performed has been increasing. This study describes methods and cataract surgery quality in Pomurje region, Slovenia from 1998 to 2001, to identify the need for cataract surgical service in this region.Methods. For the purposes of this study, data from medical documentation of all 1182 cataract surgery procedures performed in Murska Sobota Eye Department from 1998 to 2001 were obtained.Results. The rate of cataract surgery has increased from 1.5 to 3.3 per 1000 inhabitants during the observed period. The percentage of glaucoma and diabetes in operated patients has grown in this period. Extracapsular cataract extraction has been replaced by phacoemulsification. In 2001, 95.5% of procedures was performed by phacoemulsification and in 99.0% of cases intraocular lenses were implanted during the surgery. The average pre-operative visual acuity was 0.05 in 1998, 0.11 in 1999, 0.16 in 2000 and 0.22 in 2001. The average waiting period for surgery was 3 months in 1998 and 16 months in 2001.Uncorrected post-operative visual acuity of 1.0 was achieved in 29% and in 50% surgical procedures in years of 1998 and 2001, respectively. The number of complications decreased.Conclusions. A number of cataract surgeries increased and their outcomes showed a considerable improvement. At the same time, real patient needs weren’t addressed as waiting time for surgery increased. Waiting time for surgery has increased. It is to be feared that the number of patients, waiting for the cataract surgery, will increase unless the number of procedures increases. The number of procedures allowed to be performed is too low compared to the number of patients with cataracts.

  11. Contract for service to produce 50 tonnes sterifeed - lesson learned from semi-commercial scale test production

    International Nuclear Information System (INIS)

    Hassan Hamdani Mutaat; Mat Rasol Awang; Zainon Said; Irwan Md Arif; Alias K Sadeli

    2005-01-01

    A contract for service has been awarded to a local company to produce 50 tonnes Sterifeed in a period of 4 months commencing 3 September 2001. The production was for supplying enough feed for the testing of Sterifeed on cattle. Appointed contractor was required to manage the production, supply labours and provide transport for the full production operation of the plant. The production performance is discussed based on: the labour cost; supervision and control; and skill and training. This report discusses and evaluate the suitability of service for contract for the future commercial scale production. (Author)

  12. Myocardial perfusion imaging in Denmark: activity from 1997 to 2001 and current practice

    DEFF Research Database (Denmark)

    Petersen, Claus Leth; Kjaer, Andreas

    2003-01-01

    , and the survey thus covers all MPI performed in Denmark during the period in question. The number of MPI studies (examined patients) was 2,531 in 1997 (0.47 MPI/1,000/year) and 4,961 (0.93 MPI/1,000/year) in 2001, which is a doubling in activity in 5 years. Nineteen (95%) of the Danish departments performed MPI...... in 2001, and 14 (74%) of these reported that activity had increased over the past 5 years. MPI activity was unevenly distributed between hospitals and regions. In 2001, the university hospitals in the central Copenhagen region (capital) accounted for the highest MPI activity (2.00/1,000/year), while......A questionnaire was sent to all departments of nuclear medicine in Denmark (n=20) asking for details of myocardial perfusion imaging (MPI), including the number of patients examined each year from 1997 to 2001 and the current clinical and technical practice. All (100%) departments replied...

  13. Energy conservation. Federal shared energy savings contracting

    International Nuclear Information System (INIS)

    Fultz, Keith O.; Milans, Flora H.; Kirk, Roy J.; Welker, Robert A.; Sparling, William J.; Butler, Sharon E.; Irwin, Susan W.

    1989-04-01

    A number of impediments have discouraged federal agencies from using shared energy savings contracts. As of November 30, 1988, only two federal agencies - the U.S. Postal Service (USPS) and the Department of the Army -had awarded such contracts even though they can yield significant energy and cost savings. The three major impediments we identified were uncertainty about the applicability of a particular procurement policy and practice, lack of management incentives, and difficulty in measuring energy and cost savings. To address the first impediment, the Department of Energy (DOE) developed a manual on shared energy savings contracting. The second impediment was addressed when the 100th Congress authorized incentives for federal agencies to enter into shared savings contracts. DOE addressed the third impediment by developing a methodology for calculating energy consumption and cost savings. However, because of differing methodological preferences, this issue will need to be addressed on a contract-by-contract basis. Some state governments and private sector firms are using performance contracts to reduce energy costs in their buildings and facilities. We were able to identify six states that were using performance contracts. Five have established programs, and all six states have projects under contract. The seven energy service companies we contacted indicated interest in federal shared energy savings contracting

  14. Õigusrikkumised [2001] = Violation of jurisdiction

    Index Scriptorium Estoniae

    2002-01-01

    Tabelid. Registreeritud kuriteod, 2001, kuritegevuse tase 10 000 elaniku kohta, 1993-2001, kuriteod liikide lõikes, 2001, narkokuriteod, 2000-2001, tapmisi 10 000 elaniku kohta, 1996-2001, Tallinna avaliku korra rikkumised, 1992-2001, väljasõidud, 2001, hukkunud, vigastatud ja päästetud tulekahjudes, 2001, kuritegevus ja selle avastamine Tallinnas, 2001. - Rööptekst ing. keeles

  15. A Receiver-Initiated Collision-Avoidance Protocol for Multi-Channel Networks

    Science.gov (United States)

    2001-01-01

    00-00-2001 to 00-00-2001 4. TITLE AND SUBTITLE A Receiver-Initiated Collision-Avoidance Protocol for Multi-Channel Netowrks 5a. CONTRACT NUMBER...images. 14. ABSTRACT 15. SUBJECT TERMS 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT 18. NUMBER OF PAGES 10 19a. NAME OF RESPONSIBLE

  16. Analysis the relationship between psychological contract and organisational justice perception of paramedical personnel

    Directory of Open Access Journals (Sweden)

    Necmettin Cihangiroglu

    2015-08-01

    Full Text Available This study was conducted to find out if the psychological contract and organizational justice perceptions of paramedical personnel were affected by their socio-demographic factors and to determine whether there is a significant relation between their psychological contract and organizational justice perceptions. The study has been sectionally contucted in July-August 2010, to a 1200 bed education and research hospital in Ankara. We aimed at reaching all of the paramedical personnel without any sampling. Of 600 questionnaires distributed, we collected 458 (76,3%. The questionnaire used for collecting data consists of three parts. The first part concentrates on the individual characteristics of health workers while the second part contains the 17 item Psychological Contract Scale developed by Millward and Hopkins (1998 that is based on the quantitative approach of psychological contract. ln the third part, we used the and ldquo;Organisational Justice Measurement'' with 17 statements developed by Colquitt (2001. One of the statements refers to the study of Iscan and Naktiyok (2004. The results of the study showed that the psychological contract and organizational justice perceptions of paramedical personnel were very low. Also, their psychological contract and organizational justice perceptions were significantly affected by gender (p0,05. In addition, it was seen that there was a significant but weak relationshlp between health workers' psychological contract and organizational justice perceptions. The results of this study can provide signiflcant information to the health care management to understand psychological contract and organisational justice perception of their paramedical personnel. [TAF Prev Med Bull 2015; 14(4.000: 293-299

  17. Annual Report 2001

    International Nuclear Information System (INIS)

    2002-01-01

    This document describes the research and development projects carried out at CIEMAT in the areas that form the basis of our activities; energy and environment, along with the objectives, scope and most significant results; information on human resources, as well as direct and indirect expenditures and cost of personnel is included for each project in order to given an idea of its real dimensions. The results complied here correspond to 2001 achievements. Finally, the predicted dedication of personnel with degrees presented in the general data for each project corresponds to the year 2001. We hope that this information will be of use to persons and institutions interested in CIEMAT activities and that it will stimulate collaboration with other researchers, technology centres and companies interested in the same and related subjects. Annex I and II compile some general data on CIEMAT for 2001: A flowchart, 2001 collaboration, financial and human resources and a bibliography of articles published in national and international journals during 2001. (Author)

  18. INIS Progress and Activity Report 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    Highlights of INIS Activities 2001: The International Nuclear Information System (INIS) collects and distributes scientific information in all areas of nuclear science and technology published in Member States, including bibliographic data and the full text of documents - reports, dissertations, etc. - which are not readily available through commercial channels (the non-conventional literature, NCL). Membership: In 2001, the number of participating members was 122 and included 103 countries and 19 international organisations. Bibliographic Database: INIS was able to augment the level and maintain the quality of input into the Bibliographic Database in 2001. A total of 69 391 records were added to the database, an increase of 3 677 records from 2000. There are now 2 283 882 records in the INIS database. This includes 6 170 bibliographic records prepared as voluntary contribution by INIS Members2 (including electronic journals and 657 records of British Library NCL) and 8 111 records prepared by the INIS Secretariat (3 929 IAEA and UN documents, along with 4 182 electronic records and NCL documents from the British Library). The Agency signed an agreement with Elsevier Science BV for the acquisition of electronic bibliographic records. These records will be upgraded to INIS standards and added to the collection of articles from core scientific journals. INIS Members from the Netherlands, the United Kingdom, the USA and Ireland directly funded this project. Data has been delivered in December 2001, and processing started in 2002. As of the end of 2001, there were a total of 128 paid and free subscriptions to the INIS Database on the Internet, for a total of 70 068 authorised users. This is a significant increase from last year. The INIS Database on CD-ROM had 438 paid and free subscriptions.

  19. INIS Progress and Activity Report 2001

    International Nuclear Information System (INIS)

    2002-01-01

    Highlights of INIS Activities 2001: The International Nuclear Information System (INIS) collects and distributes scientific information in all areas of nuclear science and technology published in Member States, including bibliographic data and the full text of documents - reports, dissertations, etc. - which are not readily available through commercial channels (the non-conventional literature, NCL). Membership: In 2001, the number of participating members was 122 and included 103 countries and 19 international organisations. Bibliographic Database: INIS was able to augment the level and maintain the quality of input into the Bibliographic Database in 2001. A total of 69 391 records were added to the database, an increase of 3 677 records from 2000. There are now 2 283 882 records in the INIS database. This includes 6 170 bibliographic records prepared as voluntary contribution by INIS Members2 (including electronic journals and 657 records of British Library NCL) and 8 111 records prepared by the INIS Secretariat (3 929 IAEA and UN documents, along with 4 182 electronic records and NCL documents from the British Library). The Agency signed an agreement with Elsevier Science BV for the acquisition of electronic bibliographic records. These records will be upgraded to INIS standards and added to the collection of articles from core scientific journals. INIS Members from the Netherlands, the United Kingdom, the USA and Ireland directly funded this project. Data has been delivered in December 2001, and processing started in 2002. As of the end of 2001, there were a total of 128 paid and free subscriptions to the INIS Database on the Internet, for a total of 70 068 authorised users. This is a significant increase from last year. The INIS Database on CD-ROM had 438 paid and free subscriptions

  20. Operational Contract Support: Economic Impact Evaluation and Measures of Effectiveness

    Science.gov (United States)

    2017-12-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT OPERATIONAL CONTRACT SUPPORT: ECONOMIC IMPACT EVALUATION AND MEASURES...DATES COVERED MBA professional report 4. TITLE AND SUBTITLE OPERATIONAL CONTRACT SUPPORT: ECONOMIC IMPACT EVALUATION AND MEASURES OF EFFECTIVENESS 5...evaluation, expeditionary economics , operational contract support, measure of effectiveness 15. NUMBER OF PAGES 89 16. PRICE CODE 17. SECURITY

  1. Model of contract of purchase of the electric power produced by cogeneration facilities and benefiting from the electricity purchase obligation. Established after enforcement of the article 5 of the decree from May 10, 2001 and approved by the minister attended to energy; Modele de contrat d'achat de l'energie electrique produite par les installations de cogeneration et beneficiant de l'obligation d'achat d'electricite. Etablie en application de l'article 5 du decret du 10 mai 2001 et approuve par le Ministre charge de l'electricite

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This model of contract comprises 3 parts. The first part describes the general conditions of electric power purchase: aim of the contract, connection to the grid and delivery point, producer's facility, reciprocal commitments and stoppages for maintenance purpose, energy and power metering and control, tariffing periods and energy delivery, payment for the purchased power (tariffs, energy efficiency incentives, conditions, controls, tariffs indexing), taxes, payments, contract enforcement, date line, suspension, modification or cancellation, conciliation in case of dispute. A recall of the tariffs mentioned in the by-law from July 31, 2001, of the approximation rules and a model of certificate are given in appendixes. The second part gives some complements to the general conditions (purchaser and producer corporate, characteristics of the facility, details about the connection and delivery point, description of the metering system, tariffs of purchase and indexing, payment of bills, contract characteristics, subscription for a power supply contract). The third part is an additional clause concerning the operation and tariffs of purchase when the cogeneration facility is in a dispatch mode. (J.S.)

  2. Proposal for the award of three contracts for the supply and delivery of liquid nitrogen

    CERN Document Server

    2001-01-01

    This document concerns the award of three contracts for the supply and delivery of liquid nitrogen. A call for tenders (IT-3016/LHC) was sent on 21 September 2001 to 24 firms in eight Member States. By the closing date, CERN had received tenders from four firms in one Member State. For the reasons explained in this document, the Finance Committee is invited to agree to the negotiation of the following three contracts: - a contract with PRAXAIR (FR), the lowest bidder, for the supply of up to 20 000 metric tons of liquid nitrogen over a period of three years for an amount not exceeding 2 486 000 Swiss francs, not subject to revision. - a contract with MESSER FRANCE (FR), the second lowest bidder, for the supply of up to 15 000 metric tons of liquid nitrogen over a period of three years for an amount not exceeding 1 292 542 euros (1 905 000 Swiss francs), not subject to revision. The rate of exchange which has been used is that stipulated in the tender. - a contract with AIR PRODUCTS (FR), the third lowest bidd...

  3. Steam Digest 2001

    Energy Technology Data Exchange (ETDEWEB)

    2002-01-01

    Steam Digest 2001 chronicles BestPractices Program's contributions to the industrial trade press for 2001, and presents articles that cover technical, financial and managerial aspects of steam optimization.

  4. Requirements on a B2B e-contract language

    NARCIS (Netherlands)

    Angelov, S.; Grefen, P.W.P.J.

    2005-01-01

    Electronic contracts are the instrument to govern electronic trading relationships between business parties. A number of efforts exist in both the academic and industrial worlds to define an e-contract specification language. However, these efforts lack either universality or completeness. The main

  5. Biomarkers of air pollution exposure

    Czech Academy of Sciences Publication Activity Database

    Šrám, Radim; Binková, Blanka; Beskid, Olena; Biroš, Erik; Chvátalová, Irena; Stávková, Zdena; Milcová, Alena; Rössner, P.; Šmerhovský, Zdeněk

    93(1) (2003), s. 16 ISSN 0901-9928. [Nordic Conference of the Nordic Societies of Toxicology and Environmental Mutagenesis /7./. 15.06.2003-18.06.2003, Bornholm] Grant - others:EC IC(XE) QLRT-2000-00091 Institutional research plan: CEZ:AV0Z5039906 Keywords : polycyclic aromatic hydrocarbons * occupational exposure * environmental exposure Subject RIV: EB - Genetics ; Molecular Biology

  6. Green chemistry for preparation of oligopyrrole macrocycles precursors: Novel methodology for dipyrromethanes and tripyrromethanes synthesis in water

    Czech Academy of Sciences Publication Activity Database

    Král, Vladimír; Vašek, P.; Dolenský, B.

    2004-01-01

    Roč. 69, č. 5 (2004), s. 1126-1136 ISSN 0010-0765 R&D Projects: GA ČR GA203/02/0933; GA ČR GA203/02/0420; GA ČR GP203/03/D049 Grant - others:QLRT(XE) 2000-02360 Keywords : oligopyrrole macrocycles * porphyrins * calixpyrrols Subject RIV: CC - Organic Chemistry Impact factor: 1.062, year: 2004

  7. 78 FR 68829 - Information Collection Requirement; Defense Federal Acquisition Regulation Supplement; Contract...

    Science.gov (United States)

    2013-11-15

    ... DFARS 252.232-7007, Limitation of Government's Obligation. DFARS subpart 232.7, Contract [[Page 68830...; Defense Federal Acquisition Regulation Supplement; Contract Financing AGENCY: Defense Acquisition... and OMB Number: Defense Federal Acquisition Regulation Supplement (DFARS) Part 232, Contract Financing...

  8. Quality of the cardiovascular drugs prescribing in Zagreb during the period 2001- 2004

    Directory of Open Access Journals (Sweden)

    Dražen Stojanović

    2009-02-01

    Full Text Available Aim To investigate the outpatient utilisation of cardiovasculardrugs in Zagreb, during the 2001-2004 period, and to identify thepossible association between the increase in the utilisation of particulardrug groups and decrease in the number of hospital admissions.Methods The number of DDD per thousand inhabitants per day(DDDs/TID was calculated from data on the number and size ofdispensed drug packages, obtained from the Zagreb Pharmacies.Drug Utilisation 90% (DU90% method was used on assessmentof drug prescribing quality.Results Total utilisation of the cardiovascular drugs was high inZagreb during the 2001-2004 period (between 402.9 DDDs/TIDand 406.9 DDDs/TID. Agents acting on the renin-angiotensinsystem (C09 (121.3 DDDs/TID and calcium channel blockers(C08 (87.5 DDDs/TID accounted for more than 50% of drugsused for the treatment of hypertension in 2004. The greatest utilisationincrease was observed for statins (78.3%. Comparison ofDU90% segment between 2001 and 2004 revealed pentoxifyllineand amiodarone to be absent, whereas cilazapril and ramipril intheir combination with HCTZ, bisoprolol, valsartan and losartanalone or in their combination with HCTZ were added in 2004,DU90% segment still contain doxazosin and propafenone, whichhad no grounds in therapeutic guidelines.Conclusion The outpatient utilisation of cardiovascular drugs washigh during the 2001-2004 period. The utilization pattern was improved.The result was a decrease in the number of hospital admissionsfor main cardiovascular events.

  9. Payment contracts in a preventive health care system: a perspective from operations management.

    Science.gov (United States)

    Yaesoubi, Reza; Roberts, Stephen D

    2011-12-01

    We consider a health care system consisting of two noncooperative parties: a health purchaser (payer) and a health provider, where the interaction between the two parties is governed by a payment contract. We determine the contracts that coordinate the health purchaser-health provider relationship; i.e. the contracts that maximize the population's welfare while allowing each entity to optimize its own objective function. We show that under certain conditions (1) when the number of customers for a preventive medical intervention is verifiable, there exists a gate-keeping contract and a set of concave piecewise linear contracts that coordinate the system, and (2) when the number of customers is not verifiable, there exists a contract of bounded linear form and a set of incentive-feasible concave piecewise linear contracts that coordinate the system. Copyright © 2011 Elsevier B.V. All rights reserved.

  10. Current problems associated with nuclear plant construction contracts

    International Nuclear Information System (INIS)

    Albano, Raffaele.

    1977-01-01

    The expansion of nuclear electricity generating programmes has brought to the fore the problems associated with construction of this type of power plant. The paper analyses the contracts for such construction and describes the most common, the turnkey contract. The present tendency is to limit the scope of turnkey contracts to the nuclear system or simply to the reactor and this is especially common in advanced nuclear countries such as the US, Canada, Japan, UK and France, and this is also the case in Italy where the question of contracting nuclear plants is debated. In Germany the power utilities hold a large number of shares in the manufacturing industry and the turnkey contract is therefore more economically attractive. A detailed description of the contracting procedure is provided, including the suppliers' and purchasers' responsibilities, plant commissioning tests and handing over of the plant to the operator. (NEA) [fr

  11. Contract Labour (Regulation and Abolition) Act 1970 and labour market flexibility: An exploratory assessment of contract labour use in India's formal manufacturing

    OpenAIRE

    Das, Deb Kusum; Choudhury, Homagni; Singh, Jaivir

    2015-01-01

    One particularly significant piece of labour legislation in India is the Contract Labour (Regulation and Abolition) Act, 1970 (CLA,1970), which regulates labour hired by firms through the offices of a labour contractor - such labour being referred to as 'contract' labour in India. This paper seeks to examine this Act and its implication for manufacturing employment in India. While empirical evidence seems to indicate the presence of large number of 'contract' workers in the Indian manufacturi...

  12. Traffic and environment 2001

    International Nuclear Information System (INIS)

    2001-01-01

    Passenger transport has increased 21% and the freight transport 9% from 1990 to 2000. The CO 2 emission from air and sea transport has decreased with 18 and 16% respectively from 1990 to 1999, while the emission from car transport has increased with 25% In the same period the emissions of NMVOC, SO 2 , NO x and Co from the transportation sector has decreased with 42, 64, 26 and 44% respectively. The number of cars has increased with 16 pct. from 1995 to 2001. The energy efficiency for new registered cars has increased with 11% from 1997 to 2001. In 2000 the real price for car use was almost the same as in 1980, while in the same period a real price rise has been 33% for train transport and 50% for bus transport. The statistics, which is based on information from Statistics Denmark, Ministry of Transport, The National Road Directorate, Danish Energy Agency and The National Environmental Research Institute, present some environmental indicators for the transportation area. It is the first time this information is published, and it is still under development. (EHS)

  13. Performance Optimization of Tensor Contraction Expressions for Many Body Methods in Quantum Chemistry

    International Nuclear Information System (INIS)

    Hartono, Albert; Lu, Qingda; Henretty, Thomas; Krishnamoorthy, Sriram; Zhang, Huaijian; Baumgartner, Gerald; Bernholdt, David E.; Nooijen, Marcel; Pitzer, Russell M.; Ramanujam, J.; Sadayappan, Ponnuswamy

    2009-01-01

    Complex tensor contraction expressions arise in accurate electronic structure models in quantum chemistry, such as the coupled cluster method. This paper addresses two complementary aspects of performance optimization of such tensor contraction expressions. Transformations using algebraic properties of commutativity and associativity can be used to significantly decrease the number of arithmetic operations required for evaluation of these expressions. The identification of common subexpressions among a set of tensor contraction expressions can result in a reduction of the total number of operations required to evaluate the tensor contractions. The first part of the paper describes an effective algorithm for operation minimization with common subexpression identification and demonstrates its effectiveness on tensor contraction expressions for coupled cluster equations. The second part of the paper highlights the importance of data layout transformation in the optimization of tensor contraction computations on modern processors. A number of considerations such as minimization of cache misses and utilization of multimedia vector instructions are discussed. A library for efficient index permutation of multi-dimensional tensors is described and experimental performance data is provided that demonstrates its effectiveness.

  14. Performance Optimization of Tensor Contraction Expressions for Many Body Methods in Quantum Chemistry

    International Nuclear Information System (INIS)

    Krishnamoorthy, Sriram; Bernholdt, David E.; Pitzer, R.M.; Sadayappan, Ponnuswamy

    2009-01-01

    Complex tensor contraction expressions arise in accurate electronic structure models in quantum chemistry, such as the coupled cluster method. This paper addresses two complementary aspects of performance optimization of such tensor contraction expressions. Transformations using algebraic properties of commutativity and associativity can be used to significantly decrease the number of arithmetic operations required for evaluation of these expressions. The identification of common subexpressions among a set of tensor contraction expressions can result in a reduction of the total number of operations required to evaluate the tensor contractions. The first part of the paper describes an effective algorithm for operation minimization with common subexpression identification and demonstrates its effectiveness on tensor contraction expressions for coupled cluster equations. The second part of the paper highlights the importance of data layout transformation in the optimization of tensor contraction computations on modern processors. A number of considerations, such as minimization of cache misses and utilization of multimedia vector instructions, are discussed. A library for efficient index permutation of multidimensional tensors is described, and experimental performance data is provided that demonstrates its effectiveness.

  15. Banking contracts

    OpenAIRE

    Durčáková, Klára

    2010-01-01

    Resumé - Bank Contracts Bank Contracts are an integral part of our everyday lives. Citizen and bussines entities used bank contracts very often. Despite this fact we can't find legal definition in the Czech law. Banking contracts understand contracts that are signed by banks in their business activities and obligations under these contracts arise. While the banking contracts have been widely used, in Czech law there is not too much literature and judgements abou this issue. Lack of legislatio...

  16. Supplier behaviour and public contracting in the English agency nursing market.

    Science.gov (United States)

    Lonsdale, Chris; Kirkpatrick, Ian; Hoque, Kim; de Ruyter, Alex

    2010-01-01

    The worldwide expansion in the use of private firms to deliver public services and infrastructure has promoted a substantial literature on public sector contract and relationship management. This literature is currently dominated by the notion that supplier relationships should be based upon trust. Less prominent are more sceptical approaches that emphasize the need to assiduously manage potential supplier exploitation and opportunism. This article addresses this imbalance by focusing upon the recent experience of the English National Health Service (NHS) in its dealings with its nursing agencies. Between 1997 and 2001, the NHS was subjected to considerable exploitation and opportunism. This forced managers to adopt a supply strategy based upon an assiduous use of e-auctions, framework agreements and quality audits. The article assesses the effectiveness of this strategy and reflects upon whether a more defensive approach to contract and relationship management offers a viable alternative to one based upon trust.

  17. Proposal for the award of a contract for the supply of LHC dipole thermal shield bottom tray assemblies

    CERN Document Server

    2000-01-01

    This document concerns the award of a contract for the supply of 1 250 LHC dipole thermal shield bottom tray assemblies. Following a market survey carried out among 95 firms in sixteen Member States, a call for tenders (IT-2650/LHC/LHC) was sent on 8 November 1999 to eight firms in six Member States. By the closing date, CERN had received four tenders. The Finance Committee is invited to agree to the negotiation of a contract with the firm EISENWERKE KAISERSLAUTERN (DE), the lowest bidder, for the supply of 1 250 LHC dipole thermal shield bottom tray assemblies for a total amount of 6 150 808 euros (9 858 518 Swiss francs), subject to revision for contractual deliveries after 31 December 2001, with an option for the supply of up to 150 additional thermal shield bottom tray assemblies, for a total amount of 696 979 euros (1 117 118 Swiss francs), subject to revision for contractual deliveries after 31 December 2001, bringing the total amount to a maximum of 6 847 787 euros (10 975 636 Swiss francs), subject to...

  18. Building Information Modelling and Standardised Construction Contracts: a Content Analysis of the GC21 Contract

    Directory of Open Access Journals (Sweden)

    Aaron Manderson

    2015-08-01

    Full Text Available Building Information Modelling (BIM is seen as a panacea to many of the ills confronting the Architectural, Engineering and Construction (AEC sector. In spite of its well documented benefits the widespread integration of BIM into the project lifecycle is yet to occur. One commonly identified barrier to BIM adoption is the perceived legal risks associated with its integration, coupled with the need for implementation in a collaborative environment. Many existing standardised contracts used in the Australian AEC industry were drafted before the emergence of BIM. As BIM continues to become ingrained in the delivery process the shortcomings of these existing contracts have become apparent. This paper reports on a study that reviewed and consolidated the contractual and legal concerns associated with BIM implementation. The findings of the review were used to conduct a qualitative content analysis of the GC21 2nd edition, an Australian standardised construction contract, to identify possible changes to facilitate the implementation of BIM in a collaborative environment. The findings identified a number of changes including the need to adopt a collaborative contract structure with equitable risk and reward mechanisms, recognition of the model as a contract document and the need for standardisation of communication/information exchange.

  19. [The contracting process and outsourcing in health: the scenario for dispute between public and private interests].

    Science.gov (United States)

    Albuquerque, Maria do Socorro Veloso; Morais, Heloísa Maria Mendonça de; Lima, Luci Praciano

    2015-06-01

    This research analyzed the public-private composition in the municipal health network and aspects of the contracting/outsourcing process for services over the period from 2001 to 2008. The research method used was a case study with documentary research and interviews. The interviewees were former secretaries of health, directors of regulation and district managers. The categories of analysis used were public funds, care networks and public control. The results showed that the contracting was restricted to philanthropic units. With respect to the other private establishments linked to the public care network, non-compliance with programmatic aspects was detected, such as the lack of regulation of bidding processes required for contracting. Management authorities did not actively pursue building up state public services, or the formation of care networks. The contracted establishments conducted their activities without effective external and internal control mechanisms, which are paramount for the proper use of public resources. The authors conclude that the contracting process does not significantly alter the standard of buying and selling of services and indeed does not enhance the empowering process of the role of the public domain.

  20. Informal Progress Report Contract Number: DE-FG03-02NA00074/A000

    International Nuclear Information System (INIS)

    Brune, Carl R.; Grimes, Steven M.

    2003-01-01

    OAK B127 We report on work performed under contract DE-FG03-03NA00074 since January 1,2003. The research is in the area of low energy nuclear reactions and nuclear structure. The progress on research on level densities and improvement to R-Matrix calculations are presented. The preparations to begin high resolution experiments on p-shell nuclei are reviewed

  1. Model of contract of purchase of the electric power produced by facilities that use the mechanical energy of the wind, and benefiting from the electricity purchase obligation. Established after enforcement of the article 5 of the decree from May 10, 2001 and approved by the minister attended to energy; Modele de contrat d'achat de l'energie electrique produite par les installations utilisant l'energie mecanique du vent et beneficiant l'obligation d'achat d'electricite. Etablie en application de l'article 5 du decret du 10 mai 2001 et approuve par le Ministre charge de l'electricite

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This model of contract comprises 2 parts. The first part describes the general conditions of electric power purchase: aim of the contract, connection to the grid and delivery point, producer's facility, reciprocal commitments and stoppages for maintenance purpose, energy and power metering and control, energy delivery, payment for the purchased power (tariffs, energy efficiency incentives, conditions, control, tariffs indexing), taxes, payments, contract enforcement, date line, suspension, modification or cancellation, conciliation in case of dispute. A recall of the tariffs mentioned in the by-law from June 8, 2001, of the approximation rules and a model of certificate are given in appendixes. The second part gives some complements to the general conditions (purchaser and producer corporate, characteristics of the facility, details about the connection and delivery point, description of the metering system, tariffs of purchase and indexing, payment of bills, contract characteristics, subscription for a power supply contract). (J.S.)

  2. Proposal for the award of an industrial support contract for cooling water treatment

    CERN Document Server

    1999-01-01

    This document concerns the award of an Industrial Support contract for cooling water treatment for LEP, PS and SPS. Following a market survey carried out among 46 firms in twelve Member States, a call for tenders (IT-2557/ST) was sent on 26 July 1999 to seven firms and two consortia in five Member States. By the closing date, CERN had received five tenders from firms and consortia in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium AQUAZUR (FR) and SCHILLING CHEMIE (DE), the lowest bidder after realignment, for an initial period of three years, starting on 1 January 2000, for a total amount not exceeding 976 482 Swiss francs, not subject to revision until 31 December 2001. The contract will include options for two further one-year extensions beyond the initial three year period. The consortium has indicated the following distribution by country of the work covered by this adjudication proposal: FR - 52% and DE - 48%.

  3. [The Brazilian National Health Surveillance Agency performance evaluation at the management contract model].

    Science.gov (United States)

    Moreira, Elka Maltez de Miranda; Costa, Ediná Alves

    2010-11-01

    The Brazilian National Health Surveillance Agency (Anvisa) is supervised by the Ministry of Health by means of a management contract, a performance evaluation tool. This case study was aimed at describing and analyzing Anvisa's performance evaluation model based on the agency's institutional purpose, according to the following analytical categories: the management contract formalization, evaluation tools, evaluators and institutional performance. Semi-structured interviews and document analysis revealed that Anvisa signed only one management contract with the Ministry of Health in 1999, updated by four additive terms. The Collegiate Board of Directors and the Advisory Center for Strategic Management play the role of Anvisa's internal evaluators and an Assessing Committee, comprising the Ministry of Health, constitutes its external evaluator. Three phases were identified in the evaluation model: the structuring of the new management model (1999-2000), legitimation regarding the productive segment (2001-2004) and widespread legitimation (2005). The best performance was presented in 2000 (86.05%) and the worst in 2004 (40.00%). The evaluation model was shown to have contributed little towards the agency's institutional purpose and the effectiveness measurement of the implemented actions.

  4. The use of physical and virtual infrastructures for the validation of algal cryopreservation methods in international culture collections

    Czech Academy of Sciences Publication Activity Database

    Day, J. G.; Lorenz, M.; Wilding, T.A.; Friedl, T.; Harding, K.; Pröschold, T.; Brennan, D.; Müller, J.; Santos, L. M. A.; Santos, M. F.; Osório, H.C.; Amaral, R.; Lukešová, Alena; Hrouzek, Pavel; Lukeš, Martin; Elster, Josef; Lukavský, Jaromír; Probert, I.; Ryan, M.J.; Benson, E. E.

    2007-01-01

    Roč. 28, č. 5 (2007), s. 359-376 ISSN 0143-2044 Grant - others:Evropská unie(XE) QLRT-2000-01645 (Cobra) Institutional research plan: CEZ:AV0Z60660521; CEZ:AV0Z60050516 Source of funding: V - iné verejné zdroje Keywords : cryopreservation * storage * culture collections Subject RIV: EH - Ecology, Behaviour Impact factor: 1.141, year: 2007

  5. Xanthophyceaen assemblages during winter - spring flood: autecology and ecophysiology of Tribonema fonticolum and T. monochloron

    Czech Academy of Sciences Publication Activity Database

    Machová, K.; Elster, Josef; Adamec, Lubomír

    2008-01-01

    Roč. 600, č. 1 (2008), s. 155-168 ISSN 0018-8158 R&D Projects: GA ČR GA526/00/1442; GA MŠk ME 576 Grant - others:EU(XE) QLRT-2000-01645(COBRA) Institutional research plan: CEZ:AV0Z60050516 Keywords : Tribonema, growth conditions, temperature * temperature, inorganic carbon * desiccation, freezing Subject RIV: EF - Botanics Impact factor: 1.449, year: 2008

  6. 2001: AN OVERVIEW

    Directory of Open Access Journals (Sweden)

    M Biggiogera

    2009-12-01

    Full Text Available Among the papers published in the European Journal of Histochemistry in 2001, several deal with plant cells. Personally, as a cell biologist mainly working with animal cells, I have always been fascinated by plant cells: the images of those beautiful nuclei are not only something to look at and marvel at. In the past few years, important indications of cell structure and function have come from plant cytology and cytochemistry (see e.g. Medina et al., 2000. Along this line, Lingua and coworkers (2001 described the changes that occur after arbuscular mychorizal fungi colonization, which can induce a strong increase in metabolism. Nuclear changes can also be induced by pathogens, as in Licopersicon esculentum (Lingua et al., 2001. In the same issue, we find other interesting papers: Balestrazzi et al. (2001 have studied the expression of DNA topoisomerase I in Daucus carota: the elucidation of the expression pattern of this gene is important in the evaluation of its physiological functions. In another paper, Bianciotto et al. (2001 studied the association of arbuscular mychorrizal fungi with rhizobacteria, which are commonly used as biopesticides and biofertilizers: the anchoring between fungi and bacteria occurs by means of extracellular polysaccharides. This could be of relevance for the production of inocula with a stable fugus-bacteria association.

  7. Institutional Plan FY 2001-2005

    Energy Technology Data Exchange (ETDEWEB)

    Chartock, Michael; Hansen, Todd, editors

    2000-07-01

    The FY 2001-2005 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab, the Laboratory) mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. To advance the Department of Energy's ongoing efforts to define the Integrated Laboratory System, the Berkeley Lab Institutional Plan reflects the strategic elements of our planning efforts. The Institutional Plan is a management report that supports the Department of Energy's mission and programs and is an element of the Department of Energy's strategic management planning activities, developed through an annual planning process. The Plan supports the Government Performance and Results Act of 1993 and complements the performance-based contract between the Department of Energy and the Regents of the University of California. It identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Office of Planning and Communications from information contributed by Berkeley Lab's scientific and support divisions.

  8. Status report of seabird surveys at Horns Rev, 2000-2001

    International Nuclear Information System (INIS)

    Kjaer Christensen, T.; Clausager, I.; Krag Petersen, I.

    2002-01-01

    The present report presents the results of three bird surveys conducted in the Horns Rev area during the second half of 2001. Due to poor weather conditions in December 2001, the last survey was, however, performed on 7 January 2002. The surveys are part of the base-line investigations of birds performed in relation to the proposed construction of an offshore wind farm at Horns Rev in the Danish part of the North Sea ca 14 km southwest of Blaevandshuk. The results of the surveys during August 2001 - January 2002 are presented together with the results obtained during the period August 2000 - April 2001, and are also compared to results obtained during the period August 1999 - April 2000. Based on the distribution of the most abundant bird species recorded during 16 aerial surveys performed during August 1999 - January 2002, there were no indications that the wind farm area was of any particular importance to the birds' exploitation of the Horns Rev area. Fish-eating species like divers, gannet, terns, auks and gulls generally showed scattered and variable distributions, mainly occurring in the areas north and south of Horns Rev, and with low numbers on the reef proper and within the planned wind farm area. The distribution of benthic foraging species, eider and common Scoter, showed that they mainly exploited the coastal parts of the area off Blaevandshuk and Skallingen, although common scoter was found in relatively high numbers on the southeast slopes of the Horns Rev and within the wind farm area in the April 2001 survey. Common scoters occurred in very high numbers in January 2002. This was probably related to increased immigration of birds from the inner Danish waters during a cold period in late December 2001. Preference analyses of bird exploitation of the Horns Rev area showed that if the birds completely avoid the wind farm area after erection of the wind turbines, this will affect less than 1% of the various species, except divers where 1.58% will be

  9. The impact of an educational intervention, the New GP Contract and NICE guidelines on anti-epilepsy therapeutic drug monitoring.

    Science.gov (United States)

    Minshall, I; Berry, D; Smith, D

    2011-03-01

    Since the early 1970s therapeutic drug monitoring (TDM) of anti-epilepsy drug (AED) levels has been available to assist in the review process of patients with epilepsy. Routine blood levels were not part of the Quality and Outcomes Framework in the New GP Contract, neither have they been generally recommended in National Guidelines (NICE and SIGN) for the management of patients with epilepsy. To assess the impact of an educational intervention, the New GP Contract and NICE guidelines on the number of requests for TDM. Retrospective study. 39 general practices serving Chester (13), the Rural area surrounding Chester (13) and Ellesmere Port (13). An educational intervention took place in the individual Chester practices between December 2001 and March 2003. For the Rural and Ellesmere Port practices there was one combined event in March 2004 and in March 2007, respectively. Practices were encouraged, not to routinely request TDM, except in certain circumstances. The number of TDM requests for Chester, Rural and Ellesmere Port were obtained from the local laboratory in Chester, plus other nearby hospitals, to provide control groups. The number of TDM requests from primary care for Chester, Rural, Ellesmere Port, Wirral, Crewe, Warrington and Wrexham, April to April, 2002 through to 2008, where available. There has been a fall in the number requests in all districts. The most significant falls were in Chester (47%), Rural (34%) and Ellesmere Port (47%), and corresponded to the time of their educational intervention. The fall has been less marked in Wirral (25%), Crewe (27%), Wrexham (10%) and Warrington (9%). In 2004, the first year after the introduction of the New GP Contract, TDM in Chester and the Rural fell significantly, while those in Ellesmere Port, Wirral, Crewe and Wrexham increased. TDM dropped significantly in Ellesmere Port in the year after their educational intervention. Despite the valproate assay being clinically unhelpful there were still 611 requests

  10. International nuclear power status 2001; International kernekraftstatus 2001

    Energy Technology Data Exchange (ETDEWEB)

    Lauritzen, B.; Majborn, B.; Nonboel, E.; Oelgaard, P.L. (eds.)

    2002-04-01

    This report is the eighth in a series of annual reports on the international development of nuclear power with special emphasis on reactor safety. For 2001, the report contains: 1) General trends in the development of nuclear power; 2) Nuclear terrorism; 3) Statistical information on nuclear power production (in 2000); 4) An overview of safety-relevant incidents in 2001; 5) The development in West Europe; 6) The development in East Europe; 7) The development in the rest of the world; 8) Development of reactor types; 9) The nuclear fuel cycle; 10) International nuclear organisations. (au)

  11. 23 CFR 635.121 - Contract time and contract time extensions.

    Science.gov (United States)

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.121 Contract time and contract time extensions. (a) The STD should have adequate written procedures for the determination of contract... 23 Highways 1 2010-04-01 2010-04-01 false Contract time and contract time extensions. 635.121...

  12. A 'new' psychological contract for nurses: some management implications.

    Science.gov (United States)

    Cavanagh, S J

    1996-03-01

    Changes within the health services are raising a number of employment issues for nurses. The idea that a professional qualification and a job will lead to security of employment and career development is rapidly changing. These assumptions, the 'old' psychological contract, is giving way to new expectations from employers and employees; the emergence of a 'new' psychological contract. A psychological contract is an implicit agreement between employer and employee that each party will treat the other fairly. Such contracts are maintained by virtue of all parties wanting to seek agreement on issues where possible and to maintain trust. While such a contract is not a legally binding agreement it is nonetheless a binding understanding between people. Changes to this psychological contract can have important implications for individuals and their employer in terms of work and organizational commitment. This paper will discuss some of the issues surrounding psychological contracts and the impact of violating them. It will also discuss, from a management perspective, how psychological contracts develop between employer and employee, and how to form a 'new' psychological contract based upon mutual benefit and shared values.

  13. Recognition For Index Option Contracts U nder IAS 39 And IFRS 9 – The Case Of Option Contracts Bound To BIST 30 Index

    Directory of Open Access Journals (Sweden)

    Nevran Karaca

    2014-09-01

    Full Text Available There is a limited number of academic studies about accoun ting for derivative products but non of them relating to the accounting for index option contracts. Within the scope of the study, it is aimed to indicate accounting regulations and procedures to be followed under IAS 39 and IFRS 9 for option contracts whi ch traded in Futures and Options Exchange. The BIST 30 index option contracts having the highest volume of transaction and traded in VIOP is the main subject of the study via this objective. It is aimed to make the issue explicit by the help of a fictional ized example about these contracts.

  14. New transport and handling contract

    CERN Multimedia

    SC Department

    2008-01-01

    A new transport and handling contract entered into force on 1.10.2008. As with the previous contract, the user interface is the internal transport/handling request form on EDH: https://edh.cern.ch/Document/TransportRequest/ To ensure that you receive the best possible service, we invite you to complete the various fields as accurately as possible and to include a mobile telephone number on which we can reach you. You can follow the progress of your request (schedule, completion) in the EDH request routing information. We remind you that the following deadlines apply: 48 hours for the transport of heavy goods (up to 8 tonnes) or simple handling operations 5 working days for crane operations, transport of extra-heavy goods, complex handling operations and combined transport and handling operations in the tunnel. For all enquiries, the number to contact remains unchanged: 72202. Heavy Handling Section TS-HE-HH 72672 - 160319

  15. Organization and management of the LHC civil-engineering contracts

    CERN Document Server

    Watson, T

    1999-01-01

    Since July 1994, the CERN Civil Engineering group within the ST division has been preparing and engaging contracts related to the Large Hadron Collider (LHC) project. Several of these contracts have values in excess of 10 MCHF and will be executed over a number of years; as such they represent an important part of the infrastructure works required for the LHC. To date, in excess of two hundred and fifty companies have been consulted in relation to these contracts. Contracts or orders have been placed with over thirty companies or joint ventures of companies from nearly all the CERN Member States. This paper aims to show the inter-relationships between these contracts and how the Civil Engineering group is carrying out the management of these important LHC contracts. The organization of the group will be explained along with the roles of individual members within the group.

  16. 2001 annual report

    International Nuclear Information System (INIS)

    2002-01-01

    This document is the 2001 annual report of the French union of the petroleum industry (UFIP). It summarizes the highlights of the petroleum industry activity in France in 2001 and gives some additional information about the production, refining and distribution of petroleum products in the rest of the world. (J.S.)

  17. 48 CFR 2001.301 - Policy.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Policy. 2001.301 Section 2001.301 Federal Acquisition Regulations System NUCLEAR REGULATORY COMMISSION GENERAL NUCLEAR REGULATORY COMMISSION ACQUISITION REGULATION SYSTEM Agency Acquisition Regulations 2001.301 Policy. Policy...

  18. Report on the Elderly 2001

    NARCIS (Netherlands)

    M.M.Y. de Klerk

    2001-01-01

    Original title: Rapportage ouderen 2001. The Report on the Elderly 2001 (Rapportage ouderen 2001) presents a broad picture of the social position of the elderly in the Netherlands. Central themes addressed are participation in education and the labour market, financial position,

  19. Contract on using computer resources of another

    Directory of Open Access Journals (Sweden)

    Cvetković Mihajlo

    2016-01-01

    Full Text Available Contractual relations involving the use of another's property are quite common. Yet, the use of computer resources of others over the Internet and legal transactions arising thereof certainly diverge from the traditional framework embodied in the special part of contract law dealing with this issue. Modern performance concepts (such as: infrastructure, software or platform as high-tech services are highly unlikely to be described by the terminology derived from Roman law. The overwhelming novelty of high-tech services obscures the disadvantageous position of contracting parties. In most cases, service providers are global multinational companies which tend to secure their own unjustified privileges and gain by providing lengthy and intricate contracts, often comprising a number of legal documents. General terms and conditions in these service provision contracts are further complicated by the '.service level agreement', rules of conduct and (nonconfidentiality guarantees. Without giving the issue a second thought, users easily accept the pre-fabricated offer without reservations, unaware that such a pseudo-gratuitous contract actually conceals a highly lucrative and mutually binding agreement. The author examines the extent to which the legal provisions governing sale of goods and services, lease, loan and commodatum may apply to 'cloud computing' contracts, and analyses the scope and advantages of contractual consumer protection, as a relatively new area in contract law. The termination of a service contract between the provider and the user features specific post-contractual obligations which are inherent to an online environment.

  20. Greening Public Buildings: ESCO-Contracting in Danish Municipalities

    Directory of Open Access Journals (Sweden)

    Jesper Rohr Hansen

    2013-05-01

    Full Text Available This paper presents current research on Danish municipalities’ use of Energy Service Companies (ESCO as a way to improve the standard of public buildings and to increase energy efficiency. In recent years more and more municipalities have used ESCO-contracts to retrofit existing public buildings, and to make them more energy efficient. At the moment 30 municipalities (of the 98 municipalities in Denmark are involved in, or preparing, ESCO contracts. Nevertheless, ESCO-contracting still faces many challenges on the Danish market, as there is a widespread skepticism towards the concept amongst many stakeholders. The purpose of this paper is to discuss the various experience gained so far by municipalities use of ESCO-contracting, the different approached to ESCO-contracting being used in practice, as well as the different viewpoints drivers and barriers behind the development. The strong growth in ESCO-contracts reflects that the ESCO-concept fits well with a number of present problems that municipalities are facing, as well as a flexible adaptation to the local context in different municipalities.

  1. Network meta-analyses performed by contracting companies and commissioned by industry

    NARCIS (Netherlands)

    Schuit, Ewoud; Ioannidis, John P A

    2016-01-01

    Background: Industry commissions contracting companies to perform network meta-analysis for health technology assessment (HTA) and reimbursement submissions. Our objective was to estimate the number of network meta-analyses performed by consulting companies contracted by industry, to assess whether

  2. Engineering and Statistical Research Institute contract reports to May, 1983

    Energy Technology Data Exchange (ETDEWEB)

    Thuns, A; Morrison, B A

    1983-06-01

    The purpose of this publication is to provide information on certain Canadian agricultural research contracts which are completed, published and available for loan. These contracts reports are documentation of research contracted out to non-federal government agencies, universities or individuals. Reports on contracts under the control of the Engineering and Statistical Research Institute are written by the contractor, and are reviewed by the scientific authority. Some reports date back to 1973, when the initial contracting program began. The first program was called DREAM (Development, Research, and Evaluation in Agricultural Mechanization). In 1977-78, projects under the Energy in Agriculture program were added. This was the beginning of the AERD (Agricultural Enginering Research and Development) program. In 1981, energy research had expanded and came under a separate progam called ERDAF (Energy Research and Development in Agriculture and Food). The remaining contract work stayed with the AERD program. This publication lists only contracts completed having final reports, and available contract reports with separate listings sorted by contract file number, title, author or subject.

  3. Optometric supply and demand in Australia: 2001-2031.

    Science.gov (United States)

    Kiely, Patricia M; Healy, Ernest; Horton, Peregrine; Chakman, Joseph

    2008-07-01

    Major influences on health workforce supply include factors such as graduate numbers, retention rates and immigration. This report presents a model of the relationship of the projected Australian optometric workforce and projected optometric service demand for the period 2001 to 2031. Two contrasting hypothetical optometric supply-side scenarios are presented. Data from the Australian Bureau of Statistics on age and gender of people listing optometry as their major qualification in the 2001 census were projected over a 30-year period, accounting for factors such as ageing, attrition, new graduates and migration. Data were compared to the numbers of optometrists calculated as necessary to meet the demand for services of the Australian population to 2031. The projections indicated that in 2031, there would be 4,072 equivalent full-time optometrists, an excess of 6.9 per cent compared with demand and that of these 38 per cent would be female. Application of a 'high' growth scenario, based on increases in the proportion of optometrists in active practice, working hours by females and graduate and immigrant numbers, resulted in a projected oversupply of up to 30 per cent. Use of a 'low' growth scenario, based on decreases in the proportion of optometrists in active practice, working hours, graduate and immigrant numbers, resulted in a projected undersupply of at least 21.5 per cent. Projected numbers of optometrists using current weightings for mortality, attrition, proportion of optometrists in active practice, working hours, immigration and new graduates indicate that in 2031, there will be adequate numbers of optometrists to meet the demand for services, if service utilisation is maintained at current levels or increased slightly. The adequacy of projected numbers varies considerably if alterations are made to the weighting factors using 'high' and 'low' growth scenarios.

  4. Smart Contract Templates: essential requirements and design options

    OpenAIRE

    Clack, Christopher D.; Bakshi, Vikram A.; Braine, Lee

    2016-01-01

    Smart Contract Templates support legally-enforceable smart contracts, using operational parameters to connect legal agreements to standardised code. In this paper, we explore the design landscape of potential formats for storage and transmission of smart legal agreements. We identify essential requirements and describe a number of key design options, from which we envisage future development of standardised formats for defining and manipulating smart legal agreements. This provides a prelimin...

  5. Proposal for the award of an industrial support contract for the handling of the organization?s mail

    CERN Document Server

    1999-01-01

    This document concerns the award of an Industrial Support contract for the handling of the Organization?s mail. Following a market survey carried out among 37 firms in nine Member States, a call for tenders (IT-2402/AS/Revised) was sent on 10 August 1999 to three firms and three consortia, in five Member States. By the closing date, CERN had received five tenders from firms and consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium ISS GEBÄUDESERVICE (DE) - ISS SERVISYSTEM (CH), the lowest bidder, for an initial period of three years starting on 1st April 2000, for a total amount of 2 050 000 Swiss francs, not subject to revision until 31 March 2001. The contract will include options for two one-year extensions beyond the initial three-year period.

  6. Natural gas contracts in an emerging competitive market

    International Nuclear Information System (INIS)

    Sutherland, R.J.

    1992-01-01

    Natural gas is being viewed by many as the fuel of the 1990s and beyond because of its environmental qualities, relatively low cost and significant domestic resource base. However, in the Fall of 1991, a group of electric utility executives met with then Deputy Secretary of Energy Henson Moore and asserted that an inability to obtain long term gas contracts meant that supplies are unreliable and construction of gas-fueled generating stations is being discouraged. This study was requested by the Deputy Secretary to address the issues surrounding long-term gas contracts and supply reliability. The relationship between supply reliability and contracts is explained in terms of the number of buyers and sellers in a market. With the appropriate state regulatory policies, utilities can contract for gas and obtain reliable supplies at competitive market prices. Public utility commissioners are encouraged to permit utilities a free choice in signing gas contracts, but to allow only competitive market prices to be reflected in allowable fuel costs

  7. Natural gas contracts in an emerging competitive market

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, R.J.

    1992-11-01

    Natural gas is being viewed by many as the fuel of the 1990s and beyond because of its environmental qualities, relatively low cost and significant domestic resource base. However, in the Fall of 1991, a group of electric utility executives met with then Deputy Secretary of Energy Henson Moore and asserted that an inability to obtain long term gas contracts meant that supplies are unreliable and construction of gas-fueled generating stations is being discouraged. This study was requested by the Deputy Secretary to address the issues surrounding long-term gas contracts and supply reliability. The relationship between supply reliability and contracts is explained in terms of the number of buyers and sellers in a market. With the appropriate state regulatory policies, utilities can contract for gas and obtain reliable supplies at competitive market prices. Public utility commissioners are encouraged to permit utilities a free choice in signing gas contracts, but to allow only competitive market prices to be reflected in allowable fuel costs.

  8. Natural gas contracts in an emerging competitive market

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, R.J.

    1992-01-01

    Natural gas is being viewed by many as the fuel of the 1990s and beyond because of its environmental qualities, relatively low cost and significant domestic resource base. However, in the Fall of 1991, a group of electric utility executives met with then Deputy Secretary of Energy Henson Moore and asserted that an inability to obtain long term gas contracts meant that supplies are unreliable and construction of gas-fueled generating stations is being discouraged. This study was requested by the Deputy Secretary to address the issues surrounding long-term gas contracts and supply reliability. The relationship between supply reliability and contracts is explained in terms of the number of buyers and sellers in a market. With the appropriate state regulatory policies, utilities can contract for gas and obtain reliable supplies at competitive market prices. Public utility commissioners are encouraged to permit utilities a free choice in signing gas contracts, but to allow only competitive market prices to be reflected in allowable fuel costs.

  9. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  10. 15 CFR 2001.2 - Organization.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Organization. 2001.2 Section 2001.2 Commerce and Foreign Trade Regulations Relating to Foreign Trade Agreements OFFICE OF THE UNITED STATES TRADE REPRESENTATIVE CREATION, ORGANIZATION, AND FUNCTIONS § 2001.2 Organization. (a) The Office is...

  11. Standard form contracts and a smart contract future

    Directory of Open Access Journals (Sweden)

    Kristin B. Cornelius

    2018-05-01

    Full Text Available With a budding market of widespread smart contract implementation on the horizon, there is much conversation about how to regulate this new technology. Discourse on standard form contracts (SFCs and how they have been adopted in a digital environment is useful toward predicting how smart contracts might be interpreted. This essay provides a critical review of the discourse surrounding digitised SFCs and applies it to issues in smart contract regulation. An exploration of the literature surrounding specific instances SFCs finds that it lacks a close examination of the textual and documentary aspects of SFCs, which are particularly important in a digital environment as a shift in medium prompts a different procedural process. Instead, common perspectives are either based on outdated notions of paper versions of these contracts or on ideologies of industry and business that do not sufficiently address the needs of consumers/users in the digital age. Most importantly, noting the failure of contract law to address the inequities of SFCs in this environment can help prevent them from being codified further with smart contracts.

  12. IAEA safeguards glossary. 2001 ed

    International Nuclear Information System (INIS)

    2002-01-01

    IAEA safeguards have evolved since their inception in the late 1960s. In 1980 the IAEA published the first IAEA Safeguards Glossary (IAEA/SG/INF/l) with the aim of facilitating understanding of the specialized safeguards terminology within the international community. In 1987 the IAEA published a revised edition of the Glossary (IAEA/SG/INF/l (Rev.l)) which took into account developments in the safeguards area as well as comments received since the first edition appeared. Since 1987, IAEA safeguards have become more effective and efficient, mainly through the series of strengthening measures approved by the IAEA Board of Governors during 1992-1997, the Board's approval, in 1997, of the Model Protocol Additional to the Agreement(s) between State(s) and the International Atomic Energy Agency for the Application of Safeguards (issued as INFCIRC/540 (Corrected)), and the work, begun in 1999, directed towards the development and implementation of integrated safeguards. The IAEA Safeguards Glossary 2001 Edition reflects these developments. Each of the 13 sections of the Glossary addresses a specific subject related to IAEA safeguards. To facilitate understanding. definitions and, where applicable, explanations have been given for each of the terms listed. The terms defined and explained intentionally have not been arranged in alphabetical order, but their sequence within each section corresponds to the internal relationships of the subject treated. The terms are numbered consecutively within each section and an index referring to these numbers has been provided for ease of reference. The terms used have been translated into the official languages of the IAEA, as well as into German and Japanese. The IAEA Safeguards Glossary 2001 Edition has no legal status and is not intended to serve as a basis for adjudicating on problems of definition such as might arise during the negotiation or in the interpretation of safeguards agreements or additional protocols. The IAEA

  13. IAEA safeguards glossary. 2001 ed

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-06-01

    IAEA safeguards have evolved since their inception in the late 1960s. In 1980 the IAEA published the first IAEA Safeguards Glossary (IAEA/SG/INF/l) with the aim of facilitating understanding of the specialized safeguards terminology within the international community. In 1987 the IAEA published a revised edition of the Glossary (IAEA/SG/INF/l (Rev.l)) which took into account developments in the safeguards area as well as comments received since the first edition appeared. Since 1987, IAEA safeguards have become more effective and efficient, mainly through the series of strengthening measures approved by the IAEA Board of Governors during 1992-1997, the Board's approval, in 1997, of the Model Protocol Additional to the Agreement(s) between State(s) and the International Atomic Energy Agency for the Application of Safeguards (issued as INFCIRC/540 (Corrected)), and the work, begun in 1999, directed towards the development and implementation of integrated safeguards. The IAEA Safeguards Glossary 2001 Edition reflects these developments. Each of the 13 sections of the Glossary addresses a specific subject related to IAEA safeguards. To facilitate understanding. definitions and, where applicable, explanations have been given for each of the terms listed. The terms defined and explained intentionally have not been arranged in alphabetical order, but their sequence within each section corresponds to the internal relationships of the subject treated. The terms are numbered consecutively within each section and an index referring to these numbers has been provided for ease of reference. The terms used have been translated into the official languages of the IAEA, as well as into German and Japanese. The IAEA Safeguards Glossary 2001 Edition has no legal status and is not intended to serve as a basis for adjudicating on problems of definition such as might arise during the negotiation or in the interpretation of safeguards agreements or additional protocols. The IAEA

  14. IAEA safeguards glossary. 2001 ed

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-06-01

    IAEA safeguards have evolved since their inception in the late 1960s. In 1980 the IAEA published the first IAEA Safeguards Glossary (IAEA/SG/INF/l) with the aim of facilitating understanding of the specialized safeguards terminology within the international community. In 1987 the IAEA published a revised edition of the Glossary (IAEA/SG/INF/l (Rev.l)) which took into account developments in the safeguards area as well as comments received since the first edition appeared. Since 1987, IAEA safeguards have become more effective and efficient, mainly through the series of strengthening measures approved by the IAEA Board of Governors during 1992-1997, the Board's approval, in 1997, of the Model Protocol Additional to the Agreement(s) between State(s) and the International Atomic Energy Agency for the Application of Safeguards (issued as INFCIRC/540 (Corrected)), and the work, begun in 1999, directed towards the development and implementation of integrated safeguards. The IAEA Safeguards Glossary 2001 Edition reflects these developments. Each of the 13 sections of the Glossary addresses a specific subject related to IAEA safeguards. To facilitate understanding. definitions and, where applicable, explanations have been given for each of the terms listed. The terms defined and explained intentionally have not been arranged in alphabetical order, but their sequence within each section corresponds to the internal relationships of the subject treated. The terms are numbered consecutively within each section and an index referring to these numbers has been provided for ease of reference. The terms used have been translated into the official languages of the IAEA, as well as into German and Japanese. The IAEA Safeguards Glossary 2001 Edition has no legal status and is not intended to serve as a basis for adjudicating on problems of definition such as might arise during the negotiation or in the interpretation of safeguards agreements or additional protocols. The IAEA

  15. IAEA safeguards glossary. 2001 ed

    International Nuclear Information System (INIS)

    2002-01-01

    IAEA safeguards have evolved since their inception in the late 1960s. In 1980 the IAEA published the first IAEA Safeguards Glossary (IAEA/SG/INF/l) with the aim of facilitating understanding of the specialized safeguards terminology within the international community. In 1987 the IAEA published a revised edition of the Glossary (IAEA/SG/INF/l (Rev.l)) which took into account developments in the safeguards area as well as comments received since the first edition appeared. Since 1987, IAEA safeguards have become more effective and efficient, mainly through the series of strengthening measures approved by the IAEA Board of Governors during 1992-1997, the Board's approval, in 1997, of the Model Protocol Additional to the Agreement(s) between State(s) and the International Atomic Energy Agency for the Application of Safeguards (issued as INFCIRC/540 (Corrected)), and the work, begun in 1999, directed towards the development and implementation of integrated safeguards. The IAEA Safeguards Glossary 2001 Edition reflects these developments. Each of the 13 sections of the Glossary addresses a specific subject related to IAEA safeguards. To facilitate understanding. definitions and, where applicable, explanations have been given for each of the terms listed. The terms defined and explained intentionally have not been arranged in alphabetical order, but their sequence within each section corresponds to the internal relationships of the subject treated. The terms are numbered consecutively within each section and an index referring to these numbers has been provided for ease of reference. The terms used have been translated into the official languages of the IAEA, as well as into German and Japanese. The IAEA Safeguards Glossary 2001 Edition has no legal status and is not intended to serve as a basis for adjudicating on problems of definition such as might arise during the negotiation or in the interpretation of safeguards agreements or additional protocols. The IAEA

  16. Interpretation of Written Contracts in England

    Directory of Open Access Journals (Sweden)

    Neil Andrews

    2014-01-01

    Full Text Available This article examines the leading principles governing interpretation of written contracts under English law. This is a comprehensive and incisive analysis of the current law and of the relevant doctrines, including the equitable principles of rectification, as well as the powers of appeal courts or of the High Court when hearing an appeal from an arbitral award. The topic of interpretation of written contracts is fast-moving. It is of fundamental importance because this is the most significant commercial focus for dispute and because of the number of cross-border transactions to which English law is expressly applied by businesses.

  17. 2001 Annual report: synthesis

    International Nuclear Information System (INIS)

    2001-01-01

    This synthesis of the Annual Report 2001 presents information of the main activities on the scope of the radiation protection and nuclear safety of the Nuclear Regulatory Authority (ARN) of the Argentina during 2001

  18. Snake River Sockeye Salmon Habitat and Limnological Research; 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Kohler, Andre E.; Taki, Doug (Shoshone-Bannock Tribes, Fort Hall, ID); Griswold, Robert G. (Biolines, Stanley, ID)

    2004-08-01

    In March 1990, the Shoshone-Bannock Tribes petitioned the National Marine Fisheries Service (NMFS) to list the Snake River sockeye salmon Oncorhynchus nerka as endangered. As a result of that petition the Snake River sockeye salmon was officially listed as endangered in November 1991 under the Endangered Species Act (56 FR 58619). In 1991, the Snake River Sockeye Salmon Habitat and Limnological Research Program was implemented (Project Number 91-71, Intergovernmental Contract Number DE-BI79-91bp22548). This project is part of an interagency effort to prevent the extinction of the Redfish Lake stock of O. nerka. The Bonneville Power Administration (BPA) provides funding for this interagency recovery program through the Northwest Power Planning Council Fish and Wildlife Program (Council). Collaborators in the recovery effort include the National Marine Fisheries Service (NMFS), the Idaho Department of Fish and Game (IDFG), the University of Idaho (UI), U.S. Forest Service (USFS), and the Shoshone-Bannock Tribe (SBT). This report summarizes activities conducted by Shoshone-Bannock Tribal Fisheries Department personnel during the 2001 calendar year. Project objectives include: (1) monitor over-winter survival and emigration of juvenile anadromous O. nerka stocked from the captive rearing program; (2) fertilize Redfish Lake, fertilization of Pettit and Alturas lakes was suspended for this year; (3) conduct kokanee (non-anadromous O. nerka) population surveys; (4) monitor spawning kokanee escapement and estimate fry recruitment on Fishhook, Alturas Lake, and Stanley Lake creeks; (5) evaluate potential competition and predation interactions between stocked juvenile O. nerka and a variety of fish species in Redfish, Pettit, and Alturas lakes; (6) monitor limnological parameters of Sawtooth Valley lakes to assess lake productivity.

  19. Proposal for the award of an industrial services contract for maintenance of fire and gas detection and evacuation alarm systems

    CERN Document Server

    2001-01-01

    This document concerns the award of an Industrial Services contract for maintenance of fire and gas detection and evacuation alarm systems. Following a market survey carried out among 48 firms in fourteen Member States, a call for tenders (IT-2818/ST) was sent on 15 December 2000 to four firms and three consortia, each consisting of two firms, in five Member States. By the closing date, CERN had received tenders from one firm and three consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium SCHRACK SECONET (AT) - SOTEB (FR), the lowest bidder, for an initial period of three years from 1 October 2001 for an amount not exceeding 5 800 000 Swiss francs, not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal: AT-50%, FR-50%.

  20. [Characteristics of beneficiaries of a GP-centred health care contract in Germany].

    Science.gov (United States)

    Freund, Tobias; Szecsenyi, Joachim; Ose, Dominik

    2010-11-01

    Since 2004, primary care in Germany has increasingly been provided in special general practitioner (GP)-centred health care contracts (HZV). To date there is limited evidence about the characteristics of their beneficiaries regarding morbidity burden and health care utilization. We analysed insurance claims data from all beneficiaries of the "Allgemeine Ortskrankenkasse (AOK) Baden-Württemberg" listed in 10 general practices that contracted in a special GP-centred health care contract (HZV). We compared beneficiaries enrolled in the HZV with those who were not enrolled in the contract. Comparisons included the number of hospital admissions in 2007-2008 and the Charlson comorbidity index. Insurance claims data of 6,026 beneficiaries were available for analysis. In the third quarter of 2009, 51% (3,066) of the beneficiaries were enrolled in the HZV. They were significantly older (mean 61 years [SD 18 years] vs. 49 years [SD 22 years]; p contract tended to be older and suffered from a higher morbidity burden when compared with beneficiaries of the same health care fund who were not enrolled in the contract. Besides, beneficiaries of the contract had higher numbers of hospital admissions during the two year period before enrolment. These findings have substantial implications for individualized care management approaches that may be offered to beneficiaries of GP-centred health care contracts.

  1. Did contracting effect the use of primary health care units in Pakistan?

    Science.gov (United States)

    Malik, Muhammad Ashar; Van de Poel, Ellen; Van Doorslaer, Eddy

    2017-09-01

    For many years, Pakistan has had a wide network of Basic Health Units spread across the country, but their utilization by the population in rural and peri-urban areas has remained low. As of 2004, in an attempt to improve the utilization and performance of these public primary healthcare facilities, the government has gradually started contracting-in intergovernmental organizations to manage these BHUs. Using five nationally representative household surveys conducted between 2001 and 2012, and exploiting the gradual roll-out of this reform to apply a difference-in-difference approach, we evaluate its impact on BHU utilization. We find that contracting of the BHU management did not have any effect on health care use generally in the population, but it did significantly increase the use of BHU for childhood diarrhoea for the poor (by 4% points) and rural (3% points) households. These increases were accompanied by lower rates of self-treatment and private facilities usage. We do not find any significant effects on the self-reported satisfaction with BHU utilization. Our findings contrast with earlier small-scale studies that reported larger effects of the contracting of primary care in Pakistan. We speculate that the modest additional budget, the limited management authority of the contracting agency and the lack of clear performance indicators are reasons for the small impact of the contracting reform. Apparently critical aspects of services delivery such as location of BHUs, ineffective referral system and medical practice variation in public and private sectors have contributed to the overall low utilization of BHUs, yet these were beyond the scope of the contracting reform. © The Author 2017. Published by Oxford University Press in association with The London School of Hygiene and Tropical Medicine. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  2. Genesis of multipeaked waves of the esophagus: repetitive contractions or motion artifact?

    Science.gov (United States)

    Sampath, Neha J; Bhargava, Valmik; Mittal, Ravinder K

    2010-06-01

    Multipeaked waves (MPW) in the distal esophagus occur frequently in patients with esophageal spastic motor disorders and diabetes mellitus and are thought to represent repetitive esophageal contractions. We aimed to investigate whether the relative motion between a stationary pressure sensor and contracted peristaltic esophageal segment that moves with respiration leads to the formation of MPW. We mathematically modeled the effect of relative movement between a moving pressure segment and a fixed pressure sensor on the pressure waveform morphology. We conducted retrospective analysis of 100 swallow-induced esophageal contractions in 10 patients, who demonstrated >30% MPW on high-resolution manometry (HRM) during standardized swallows. Finally, using HRM, we determined the effects of suspended breathing and hyperventilation on the waveform morphology in 10 patients prospectively. Modeling revealed that relative movement between a stationary pressure sensor and a moving contracted segment, contraction duration, contraction amplitude, respiratory frequency, and depth of respiration affects the waveform morphology. Retrospective analysis demonstrated a close temporal association with the onset of second and subsequent contractions in MPW with respiratory phase reversals. Numbers of peaks in MPW and respiratory phase reversals were closely related to the duration of contraction. In the prospective study, suspended breathing and hyperventilation resulted in a significant decrease and increase in the MPW frequency as well as the number of peaks within MPW respectively. We conclude that MPW observed during clinical motility studies are not indicative of repetitive esophageal contraction; rather they represent respiration-related movement of the contracted esophageal segment in relation to the stationary pressure sensor.

  3. A Liquid work-life under public service contracting

    DEFF Research Database (Denmark)

    Lindholst, Christian

    for staff, however, are only poorly understood in current theory and research on public service contracting through partial concepts and a tendency to focus merely on negative outcomes. Against this shortfall, the aim in this paper is to build a conceptually and empirically richer and more authentic account......A part of the reality behind public service contracting in Denmark as well as in many other countries is that a growing number of people are employed in uncertain and temporary conditions and relations in what can be characterized as ‘liquidized’ work-lives. This reality and its consequences...... of staffs’ work-life under public service contracting. The paper relies empirically on focus group interviews in two cases of staff transfers in public service contracting with different levels of liquefaction. it is found that staff transfer is a composite experience for staff with differential outcomes...

  4. Proposal for the award of an industrial services contract for installation and removal of cables for CERN accelerators

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Services contract for installation and removal of cables for CERN accelerators. Following a market survey carried out among 128 firms in sixteen Member States, a call for tenders (IT-2760/ST) was sent on 2 June 2000 to eight firms and six consortia, four consisting of two firms, one consisting of three firms and one of four firms, in nine Member States. By the closing date, CERN had received tenders from one firm and six consortia, in nine Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium FABRICOM (BE) - AMSE (FR), the lowest bidder, for an initial period of three years from 1 July 2001 for a total amount of 18 000 000 Swiss francs, not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal: PL-40%, FR-35%, BE-2...

  5. Proposal for the award of an industrial services contract for civil engineering superstructure and internal construction building work

    CERN Document Server

    2001-01-01

    This document concerns the award of an Industrial Services contract for civil engineering superstructure and internal construction building work. Following a market survey carried out among 112 firms in fifteen Member States, a call for tenders (IT-2546/ST/Rev.) was sent on 12 April 2001 to eleven consortia, four consisting of four firms, three consisting of three firms and four consisting of two firms, in seven Member States. By the closing date, CERN had received tenders from eight consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium SPIE CITRA SUD-EST(FR)-ANTIRUST TECHNOLOGY (GR), the lowest bidder, for an initial period of three years from 1 January 2002 for an amount not exceeding 15 375 000 Swiss francs, not subject to revision. The contract will include options for two one-year extensions beyond the initial three-year period. The consortium has indicated the following distribution by country of the contract value covered by this ...

  6. Agrice 2001. Activity report

    International Nuclear Information System (INIS)

    2002-01-01

    AGRICE was created in 1994 to support research on new renewable plant-based products other than foodstuffs, to open up new markets for agriculture, and to take action on today's environmental challenges: fighting the greenhouse effect, curbing pollution (VOCs, effluents, etc.), eco-toxics, preservation of health, and depletion of fossil energy supplies. The scope of AGRICE's activity covers primarily the industrial conversion of crop production to chemicals (lubricants, surfactants, solvents, etc.), energy (liquid and solid biofuels) and materials (agro-materials, biopolymers). AGRICE's brief is to stimulate applied technological research. The consortium first tackled work aimed at substituting plant-based products for products derived from fossil resources. This strategy has been progressively widened to take into account the inherent characteristics of plant-based products in order to meet new needs. In addition to research focusing on industrial products and processes, this action spans the study of agronomic improvements, project economics, markets, and energy and environmental assessments. This report presents: 1 - the AGRICE profile, scope of activity (Biofuels (vehicles and non-vehicles), Biomolecules, Biomaterials), structure and Operations, and sectors of focus; 2 - the year 2001: Toward a new golden age of renewable plant based resources?, Financial Report and Applications, Noteworthy Achievements in 2001, Events in 2001, European Joint Undertakings; 3 - appendixes: Breakdown of AGRICE grants by sector 1994-2001, Financial report 1994-2001, Partners, The ADEME / AGRICE team, Projects initiated and completed in 2001

  7. Contract Award Decisions Resulting in Contract Termination for Default

    National Research Council Canada - National Science Library

    1996-01-01

    .... Specifically, the audit focused on contracts terminated either for default or convenience and determined whether the contract terminations could have been averted based on information available before contract award...

  8. Risø annual report 2001

    DEFF Research Database (Denmark)

    2002-01-01

    In this annual report, we present a small selection of Risø’s achievements in 2001. A more detailed review of Risø’s projects can be found in the Risø Annual Accounts for 2001 as well as in the annual progress reports prepared by the individual researchdepartments.......In this annual report, we present a small selection of Risø’s achievements in 2001. A more detailed review of Risø’s projects can be found in the Risø Annual Accounts for 2001 as well as in the annual progress reports prepared by the individual researchdepartments....

  9. Stimulation of Research in Biomedicine. Role of Effective Contract.

    Science.gov (United States)

    Aleksandrova, N V; Shkolnikova, M A; Dlin, V V; Yugay, M T

    Analysis of publication activity in the field of biomedicine shows insignificant input of Russia in the world scientific product. This is largely due to the lack of incentives for researchers. Article describes stimulation of researchers in Russia, compares it with foreign models, formulates main shortcomings of support and stimulation of research in Russia and introduces the concept of effective contract. Development of personnel motivation and stimulation of employees of scientific and research organizations in the field of health. As a successful experience the article describes the implementation of effective contract in Veltishev Research and Clinical Institute for Pediatrics where for years remuneration of researchers depended upon their positions without consideration of research results. Effective contract brought significant changes in the traditional system setting new performance and efficiency criteria. New evaluation system took into account publication activity, presentation activity, implementation of research results, raising scientific personnel, thesis work and income-generating activities. Introduction of effective contract already in the second year led to a rise in the number of foreign publications, publications in journals with impact factor of more than 2, the general increase in the number of articles in peer-reviewed journals with impact factor more than 0.3, the growth of the number of articles by 1 researcher, Hirsch index improving both by individual employees and the entire Institute, increase of grant activity and presentation activity at top-rated professional congresses. The growth of publication and presentation activities has been achieved at the reduction of research staff by 23%. From financial viewpoint effective contract resulted in the redistribution of resources in favour of more efficient researchers. The introduction of effective contract and increase of requirements for scientific output did not cause resistance of staff

  10. TraceContract

    Science.gov (United States)

    Kavelund, Klaus; Barringer, Howard

    2012-01-01

    TraceContract is an API (Application Programming Interface) for trace analysis. A trace is a sequence of events, and can, for example, be generated by a running program, instrumented appropriately to generate events. An event can be any data object. An example of a trace is a log file containing events that a programmer has found important to record during a program execution. Trace - Contract takes as input such a trace together with a specification formulated using the API and reports on any violations of the specification, potentially calling code (reactions) to be executed when violations are detected. The software is developed as an internal DSL (Domain Specific Language) in the Scala programming language. Scala is a relatively new programming language that is specifically convenient for defining such internal DSLs due to a number of language characteristics. This includes Scala s elegant combination of object-oriented and functional programming, a succinct notation, and an advanced type system. The DSL offers a combination of data-parameterized state machines and temporal logic, which is novel. As an extension of Scala, it is a very expressive and convenient log file analysis framework.

  11. Supply Chain Contracts with Multiple Retailers in a Fuzzy Demand Environment

    Directory of Open Access Journals (Sweden)

    Shengju Sang

    2013-01-01

    Full Text Available This study investigates supply chain contracts with a supplier and multiple competing retailers in a fuzzy demand environment. The market demand is considered as a positive triangular fuzzy number. The models of centralized decision, return contract, and revenue-sharing contract are built by the method of fuzzy cut sets theory, and their optimal policies are also proposed. Finally, an example is given to illustrate and validate the models and conclusions. It is shown that the optimal total order quantity of the retailers fluctuates at the center of the fuzzy demand. With the rise of the number of retailers, the optimal order quantity and the fuzzy expected profit for each retailer will decrease, and the fuzzy expected profit for supplier will increase.

  12. Avoiding surety contracts in bankruptcy procedure

    Directory of Open Access Journals (Sweden)

    Hiber Dragor

    2015-01-01

    does not mean that the guarantor gives up his right to claim from the debtor the amount paid because otherwise such transaction would represent an indirect gift rather than surety. This does mean that there is no remuneration for surety - a benefit the guarantor could expect from entering into a surety contract. Therefore, the author rejects the approach followed by a number of Serbia's courts that bankruptcy trustee may request a declaration that, in accordance with the rules on avoiding debtor's transactions, a surety contract has no legal effects.

  13. Artificial Neural Network Analysis System

    Science.gov (United States)

    2001-02-27

    Contract No. DASG60-00-M-0201 Purchase request no.: Foot in the Door-01 Title Name: Artificial Neural Network Analysis System Company: Atlantic... Artificial Neural Network Analysis System 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Powell, Bruce C 5d. PROJECT NUMBER 5e. TASK NUMBER...34) 27-02-2001 Report Type N/A Dates Covered (from... to) ("DD MON YYYY") 28-10-2000 27-02-2001 Title and Subtitle Artificial Neural Network Analysis

  14. Rapid increase in the use of oral antidiabetic drugs in the United States, 1990-2001.

    Science.gov (United States)

    Wysowski, Diane K; Armstrong, George; Governale, Laura

    2003-06-01

    To describe the use of oral antidiabetic drugs for management of type 2 diabetes in the U.S. from 1990 through 2001. Data on oral antidiabetic drugs were derived from two pharmaceutical marketing databases from IMS Health, the National Prescription Audit Plus and the National Disease and Therapeutic Index. In 1990, 23.4 million outpatient prescriptions of oral antidiabetic agents were dispensed. By 2001, this number had increased 3.9-fold, to 91.8 million prescriptions. Glipizide and glyburide, two sulfonylurea medications, accounted for approximately 77% of prescriptions of oral antidiabetic drugs in 1990 and 35.5% of prescriptions in 2001. By 2001, the biguanide metformin (approved in 1995) had captured approximately 33% of prescriptions, and the thiazolidinedione insulin sensitizers (rosiglitazone and pioglitazone marketed beginning in 1999) accounted for approximately 17% of market share. Compared with patients treated in 1990, those in 2001 were proportionately younger and they more often used oral antidiabetic drugs and insulin in combination. Internists and general and family practitioners were the primary prescribers of this class of drugs. Consistent with the reported increase in the prevalence of type 2 diabetes, the number of dispensed outpatient prescriptions of oral antidiabetic drugs increased rapidly between 1990 and 2001. This period was marked by an increase in the treatment of younger people and the use of oral antidiabetic drugs in combination. With the approval in the last decade of several new types of oral antidiabetic medications with different mechanisms of action, options for management of type 2 diabetes have expanded.

  15. Trends in viral meningitis hospitalisations and notifications in the North Eastern Health Board (1997 - 2001): a cause for concern?

    LENUS (Irish Health Repository)

    Brabazon, E D

    2004-01-01

    This study aimed to compare trends in both hospital admissions and notifications of viral meningitis in the North Eastern Health Board (NEHB). Hospital admissions from 1997 to 2001, involving NEHB residents with an infectious disease diagnosis, were examined and viral meningitis cases were analyzed. During this period 265 NEHB residents were admitted to hospital with viral meningitis--an increase of 429% between 1997 and 2001 with the bulk of this increase during 2000 and 2001. A total of 1,234 bed days were taken up by this cohort and the mean length of stay was 4.5 days (95% CI 4.2 - 4.9). The number of viral meningitis notifications in the NEHB was 38 (ranging from 4 in 1997 to 11 in 2001). This number is much lower than expected given the corresponding number of hospital admissions for the same period. Thus, most cases were not notified which means that current surveillance systems under-estimate the disease burden of viral meningitis. Such under-reporting has implications for infectious disease policy in Ireland.

  16. Environmental taxes 1991 - 2001 (2002)

    International Nuclear Information System (INIS)

    Anon.

    2002-01-01

    The statistics presents statements of environmental taxes for the period 1991-2001 (and budget figure for 2002). Environmental taxes are a concept for pollution, energy, transportation and resource related taxes. Income of the government from environmental taxes have increased from 30,0 billions DDK in 1991 to 62,2 billions DDK in 2001 - a little more than a doubling. The environmental taxes' part of the total taxes' part og the total taxes has increased from 7,5% in 1991 to 9,4% in 2001. In 2001 the energy taxes are 57%, the transportation taxes 36% and the pollution and resource taxes 7% of the environmental taxes. (LN)

  17. Polymorphic Contracts

    Science.gov (United States)

    Belo, João Filipe; Greenberg, Michael; Igarashi, Atsushi; Pierce, Benjamin C.

    Manifest contracts track precise properties by refining types with predicates - e.g., {x : Int |x > 0 } denotes the positive integers. Contracts and polymorphism make a natural combination: programmers can give strong contracts to abstract types, precisely stating pre- and post-conditions while hiding implementation details - for example, an abstract type of stacks might specify that the pop operation has input type {x :α Stack |not ( empty x )} . We formalize this combination by defining FH, a polymorphic calculus with manifest contracts, and establishing fundamental properties including type soundness and relational parametricity. Our development relies on a significant technical improvement over earlier presentations of contracts: instead of introducing a denotational model to break a problematic circularity between typing, subtyping, and evaluation, we develop the metatheory of contracts in a completely syntactic fashion, omitting subtyping from the core system and recovering it post facto as a derived property.

  18. A bibliometric study of publications by Indian ophthalmologists and vision researchers, 2001-06

    Directory of Open Access Journals (Sweden)

    Kumaragurupari R

    2010-01-01

    Full Text Available Objective: The objective was to conduct a bibliometric analysis of Indian ophthalmic papers published from 2001 to 2006 in the peer-reviewed journals, to assess productivity, trends in journal choice, publication types, research funding, and collaborative research. Materials and Methods: We searched PubMed for articles indicating both vision-related content and author affiliation with an Indian research center. We identified research collaborations and funding from indexing for research support, and classified articles as reporting basic science, clinical science, or clinically descriptive research. Impact factors were determined from Journal Citation Reports for 2006. Results: The total number of published articles that were retrieved for the years 2001 to 2006 was 2163. During the six-year period studied, the annual output of research articles has nearly doubled, from 284 in 2001 to 460 in 2006. Two-thirds of these were published in international journals; 41% in vision-related journals with 2006 impact factors; and 3% in impact factor journals which were not vision-related. Fifty percent of the publications came from nine major eye hospitals. Clinical science articles were most frequently published whereas basic science the least. Publications resulting from international collaborations increased from 3% in 2001 to 8% in 2006. The focus of the journal with the highest number of publications corresponds to the most common cause of bilateral blindness in India, cataract. Conclusion: This bibliometric study of publications of research from India in the field of ophthalmic and vision research shows that research productivity, as measured in both the number of publications in peer-reviewed journals and qualitative measures of those journals, has increased during the period of this study.

  19. Proposal for the award of an industrial services contract for the operation and maintenance of liquid helium cryogenic plants

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Services contract for the operation and maintenance of liquid helium cryogenic plants. Following a market survey carried out among 54 firms in twelve Member States, a call for tenders (IT-2719/LHC) was sent on 18 August 2000 to two firms and four consortia, two consisting of two firms and two consisting of three firms, in five Member States. By the closing date, CERN had received tenders from one firm and three consortia, in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium AIR LIQUIDE (FR) - LINDE KRYOTECHNIK (CH) - SERCO (DE), the lowest bidder, for an initial period of four years from 17 July 2001 for a total amount of 19 804 400 Swiss francs, not subject to revision until 16 July 2005. The contract will include options for two one-year extensions beyond the initial four-year period. The consortium has indicated the following distribution by country of the contract value covered by this adjudi...

  20. END-OF-YEAR-CLOSURE 2000/2001

    CERN Document Server

    Human Resources Division

    2000-01-01

    As announced in Weekly Bulletin Nº 3/2000, the Laboratory will be closed from Saturday 23 December 2000 to Sunday 7 January 2001 inclusive. This period consists of 16 days: 4 days' official holiday, i.e. 24, 25 and 31 December 2000 and 1 January 2001; 6 days' special paid leave in accordance with Article R II 4.34 of the Staff Regulations, i.e. 27, 28 and 29 December 2000 and 3, 4 and 5 January 2001; 3 Saturdays, i.e. 23 and 30 December 2000 and 6 January 2001; 2 days, 26 December 2000 to compensate for 24 December 2000 and 2 January 2001 to compensate for 31 December 2000 (Article R II 4.33 of the Staff Regulations); 1 Sunday, i.e. 7 January 2001. The first working day in the New Year will be Monday 8 January 2001. Further information will be available from Division Secretariats, specifically concerning the conditions applicable to members of the personnel who are required to work during this period.

  1. The putative sensor histidine kinase CKI1 is involved in female gametophyte development in Arabidopsis

    Czech Academy of Sciences Publication Activity Database

    Hejátko, Jan; Pernisová, M.; Eneva, T.; Palme, K.; Brzobohatý, Břetislav

    2003-01-01

    Roč. 269, č. 4 (2003), s. 443-453 ISSN 1617-4615 R&D Projects: GA MŠk VS96096; GA MŠk LN00A081 Grant - others:INCO-Copernicus(XE) ERB3512-PL966135; QLRT(XE) 2000-0020 Institutional research plan: CEZ:AV0Z5004920 Keywords : female gametophyte development * two-component signaling * sensor histidine kinase Subject RIV: BO - Biophysics Impact factor: 2.240, year: 2003

  2. Outpatient utilization of psychopharmaceuticals in the City of Zagreb 2001-2006.

    Science.gov (United States)

    Stimac, Danijela; Culig, Josip

    2009-03-01

    A comprehensive insight into drug utilization as an economic and primarily a public health issue can only be acquired in the context of overall health state of the respective population. The objectives of the study were: 1) to determine the real outpatient utilization of psychopharmaceuticals in Zagreb, 2) to determine the psychopharmaceutical prescribing quality during the study period; and 3) to propose appropriate interventions in Zagreb on the basis of the results obtained. Data on drug utilization were obtained from all Zagreb pharmacies. The number of defined daily doses (DDD) and number of DDD per 1000 inhabitants per day (DDD/1000/day) were calculated from the number of particular drug packages. The Drug Utilization 90% (DU90%) method was used as a criterion of prescribing quality. Outpatient utilization of psychopharmaceuticals showed a declining pattern from 115.40 DDD/1000/day in 2001 to 93.15 DDD/1000/day in 2006. Anxiolytics accounted for the majority of this drug group utilization in the City of Zagreb, although the anxiolytic/antidepressant ratio decreased from 7.19 in 2001 to 3.86 in 2006. The utilization of selective serotonin reuptake inhibitors showed a 2.5-fold increase and accounted for 90% of overall antidepressant utilization. A 2.5-fold decrease was recorded in the utilization of antipsychotics, while the atypical/typical antipsychotic ratio changed from 1:2 in 2001 to 1.1:1 in 2006. Despite some improvement observed in the prescribing quality, the predominance of benzodiazepines in the utilization of psychopharmaceuticals points to the need of additional rationalization in the field.

  3. 29 CFR 4.122 - Contracts for operation of postal contract stations.

    Science.gov (United States)

    2010-07-01

    ... Application of the McNamara-O'Hara Service Contract Act Specific Exclusions § 4.122 Contracts for operation of postal contract stations. The Act, in paragraph (7) of section 7, exempts from its provisions “any... 29 Labor 1 2010-07-01 2010-07-01 true Contracts for operation of postal contract stations. 4.122...

  4. 32 CFR 2001.15 - Classification guides.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Classification guides. 2001.15 Section 2001.15..., NATIONAL ARCHIVES AND RECORDS ADMINISTRATION CLASSIFIED NATIONAL SECURITY INFORMATION Classification § 2001.15 Classification guides. (a) Preparation of classification guides. Originators of classification...

  5. IPP fuel contracts - creating certain contracts for uncertain times

    Energy Technology Data Exchange (ETDEWEB)

    Coddington, I. [Coddington International Pty. Ltd., Milsons Point, NSW (Australia)

    1998-12-31

    Coal contracts for the new Asian Independent Power Producers (IPPs) are examined. Since most IPPs will be selling to state electricity utilities, often in competition with power plant using other fuels, coal based IPPs must negotiate advantageous coal supply contracts several years before the commissioning of a plant, and must ensure security of supply for at least the life of the construction loan. A more recent trend in the developed world is the Merchant IPP, where there is no guaranteed electricity sale. Lenders are wary of IPPs relying an imported coal, and insist on binding fuel contracts, while coal companies are wary of the quantity of information demanded by these lenders. A full understanding of the risks involved is needed; and a method of price indexation for the contracts. Contracts must also specify security of supply, coal quality, freight contracts and other details. 2 figs.

  6. ADMINISTRATIVE CONTRACTS. DELIMITATIONS

    Directory of Open Access Journals (Sweden)

    Liana Teodora PASCARIU

    2016-12-01

    Full Text Available Article examines whether all contracts of public persons are administrative contracts; in other words, if the administration may conclude contracts that, according to their legal nature, are not administrative. If we start from the definition of administrative contracts as it appears in Law no. 554/2004, these include contracts by public authorities which concern the enhancement of public property execution of works of public interest, public services, public procurement and other administrative contracts provided by special laws and subject to the jurisdiction of the administrative courts.

  7. Nova Scotia electricity market : frameworks for renewable energy contracting and cogeneration contracting : discussion document

    International Nuclear Information System (INIS)

    2006-01-01

    The recent Electricity Marketplace Governance Committee of Nova Scotia report issued a number of recommendations regarding renewable and cogeneration sales to retail consumers, as well as recommendations for top-up, spill rates and back-up rates to complement the operation of independent generating facilities. This discussion paper examined issues which need to be addressed in order to implement the recommendations. The discussion paper also included recommendations relating to the purchase of cogeneration output by the Nova Scotia Power Inc. (NSPI) under long term power purchase agreements. The aim of the paper was to provide a basis for the further discussion of issues in preparation for the development of future rules and regulations. The first part of the document identified ways for buyers and sellers to arrange contracts, as well as issues that need to be addressed at the institutional level to enable arrangements. Options for financial contracts and physical contracts were reviewed.The second part of the document examined pricing issues in the context of both financial and physical contract arrangements. Resolutions for both sets of options were proposed. Energy pricing principles were reviewed, as well as various pricing options and issues related to the analysis of price requirements. It was concluded that in order to support the safe, reliable and economic supply of electricity, the design of the electricity market should enable maximum flexibility in contractual arrangements and facilitate competition in ways that do not harm other parties

  8. END-OF-YEAR-CLOSURE 2001/2002

    CERN Document Server

    Human Resources Division

    2001-01-01

    As announced in Weekly Bulletin Nº 4/2001, the Laboratory will be closed from Saturday, 22 December 2001 to Sunday, 6 January 2002 inclusive. This period consists of 16 days : 4 days' official holiday, i.e. 24, 25 and 31 December 2001 and 1 January 2002; 6 days' special paid leave in accordance with Article R II 4.34 of the Staff Regulations, i.e. 26, 27 and 28 December 2001 and 2, 3 and 4 January 2002; 3 Saturdays, i.e. 22 and 29 December 2001 and 5 January 2002; 3 Sundays, i.e. 23 and 30 December 2001 and 6 January 2002. The first working day in the New Year will be Monday, 7 January 2002. Further information will be available from Division Secretariats, specifically concerning the conditions applicable to members of the personnel who are required to work during this period.

  9. Electrical contracting

    CERN Document Server

    Neidle, Michael

    2013-01-01

    Electrical Contracting, Second Edition is a nine-chapter text guide for the greater efficiency in planning and completing installations for the design, installation and control of electrical contracts. This book starts with a general overview of the efficient cabling and techniques that must be employed for safe wiring design, as well as the cost estimation of the complete electrical contract. The subsequent chapters are devoted to other electrical contracting requirements, including electronic motor control, lighting, and electricity tariffs. A chapter focuses on the IEE Wiring Regulations an

  10. Administrative contracts

    OpenAIRE

    Vukićević-Petković Milica

    2015-01-01

    Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete u...

  11. Proposal for the award of a contract for the supply of low-carbon steel sheets for the mqw quadrupole magnets

    CERN Document Server

    1999-01-01

    This document concerns the award of a contract for the supply of 1000 tonnes of low-carbon steel sheets for the MQW quadrupole magnets. Following a market survey carried out among 53 firms in 16 Member States, a call for tenders (IT-2619/SL/LHC) was sent on 24 September 1999 to three firms in two Member States. By the closing date, CERN had received two tenders. The Finance Committee is invited to agree to the negotiation of a contract with COCKERILL-SAMBRE (BE) for the supply of 1000 tonnes of low-carbon steel sheets for the MQW quadrupole magnets for a total amount of 894 780 euros (1 423 870 Swiss francs), subject to revision for contractual deliveries after 31 December 2001, with an option for the supply of up to 200 tonnes of additional low-carbon steel sheets, for a total amount of 178 956 euros (284 774 Swiss francs), subject to revision for contractual deliveries after 31 December 2001, bringing the total amount to a maximum of 1 073 736 euros (1 708 644 Swiss francs). The above amounts in Swiss franc...

  12. Production Contracts and the Spot Market Price of Hogs

    OpenAIRE

    Key, Nigel D.

    2010-01-01

    The increasing use of production contracts in the hog sector has reduced the number of spot market transactions, raised concerns about price manipulation and helped to spur legislation requiring price reporting by packers. Using data from the 2002 and 2007 Censuses of Agriculture, this study looks for evidence of market manipulation by examining whether the local prevalence of contracting affects the average price received by independent producers. The empirical approach uses a fixed-effects ...

  13. The economics of energy service contracts

    Energy Technology Data Exchange (ETDEWEB)

    Sorrell, S. [University of Sussex, Brighton (United Kingdom). Sussex Energy Group, SPRU -Science and Technology Policy Research

    2007-01-15

    Energy service contracting can provide a cost-effective route to overcoming barriers to energy efficiency. Energy service contracts allow the client to reduce operating costs, transfer risk and concentrate attention on core activities. However, the energy services model may only be appropriate for a subset of energy services and energy using organisations. A challenge for both business strategy and public policy is to identify those situations in which energy service contracting is most likely to be appropriate and the conditions under which it is most likely to succeed. Energy service contracting is a form of outsourcing. It will only be chosen where the expected reduction in the production cost of supplying energy services can more than offset the transaction cost of negotiating and managing the relationship with the energy service provider. Production costs will be determined by a combination of the physical characteristics of the energy system and the technical efficiency of the relevant organisational arrangements, including economies of scale and specialisation. Transaction costs, in turn, will be determined by the complexity of the energy service, the 'specificity' of the investments made by the contractor, the competitiveness of the energy services market and the relevant legal, financial and regulatory rules. This paper develops these ideas into a general framework that may be used to assess the feasibility of energy service contracting in different circumstances. The framework leads to a number of hypotheses that are suitable for empirical test. (author)

  14. The economics of energy service contracting

    Energy Technology Data Exchange (ETDEWEB)

    Sorrell, Steve [Univ. of Sussex (United Kingdom). SPRU

    2005-07-01

    Energy service contracting can provide a cost-effective route to overcoming barriers to energy efficiency. Energy service contracts allow the client to reduce operating costs, transfer risk and concentrate attention on core activities. However, the energy services model may only be appropriate for a subset of energy services and energy using organisations. A challenge for both business strategy and public policy is to identify those situations in which energy service contracting is most likely to be appropriate and the conditions under which it is most likely to succeed. Energy service contracting is a form of outsourcing. It will only be chosen where the expected reduction in the production cost of supplying energy services can more than offset the transactions cost of negotiating and managing the relationship with the energy service provider. Production costs will be determined by a combination of the physical characteristics of the energy system and the technical efficiency of the relevant organisational arrangements, including economies of scale and specialisation. Transaction costs, in turn, will be determined by the complexity of the energy service, the 'specificity' of the investments made by the contractor, the 'contestability' of the energy services market and the relevant legal, financial and regulatory rules. This paper develops these ideas into a general framework that may be used to assess the feasibility of energy service contracting in different circumstances. The framework leads to a number of hypotheses that are suitable for empirical test.

  15. The economics of energy service contracts

    International Nuclear Information System (INIS)

    Sorrell, Steve

    2007-01-01

    Energy service contracting can provide a cost-effective route to overcoming barriers to energy efficiency. Energy service contracts allow the client to reduce operating costs, transfer risk and concentrate attention on core activities. However, the energy services model may only be appropriate for a subset of energy services and energy using organisations. A challenge for both business strategy and public policy is to identify those situations in which energy service contracting is most likely to be appropriate and the conditions under which it is most likely to succeed. Energy service contracting is a form of outsourcing. It will only be chosen where the expected reduction in the production cost of supplying energy services can more than offset the transaction cost of negotiating and managing the relationship with the energy service provider. Production costs will be determined by a combination of the physical characteristics of the energy system and the technical efficiency of the relevant organisational arrangements, including economies of scale and specialisation. Transaction costs, in turn, will be determined by the complexity of the energy service, the 'specificity' of the investments made by the contractor, the competitiveness of the energy services market and the relevant legal, financial and regulatory rules. This paper develops these ideas into a general framework that may be used to assess the feasibility of energy service contracting in different circumstances. The framework leads to a number of hypotheses that are suitable for empirical test

  16. Analysis of the 314th Contracting Squadrons Contract Management Capability Using the Contract Management Maturity Model (CMMM)

    National Research Council Canada - National Science Library

    Jackson, Jr, Carl J

    2007-01-01

    .... The purpose of this research project is to analyze the 314th Contracting Squadron contracting processes and requirement target areas for improvement efforts by the application of the Contract Management Maturity Model (CMMM...

  17. 32 CFR 2001.21 - Original classification.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Original classification. 2001.21 Section 2001.21... Markings § 2001.21 Original classification. (a) Primary markings. At the time of original classification... authority. The name and position, or personal identifier, of the original classification authority shall...

  18. Contracting with the Enemy: The Contracting Officer’s Dilemma

    Science.gov (United States)

    2015-06-01

    contracting command xv KO contracting officer KTR contractor LSC lead service component MGAA Mesopotamia Group Atlas Apache NAT National Afghanistan...and Contract Authority Understanding the roles of contracting versus command authority and command relationships is a fundamental that must be...Audit 12-7 (2012) described the CENTCOM-JTSCC (C- JTSCC) formation and command relationship : In April 2010, CENTCOM issued a fragmentary order to

  19. 2001-2003 ''public utility'' contract between the French government and Gaz de France; Contrat de ''service public'' 2001-2003 entre l'etat et Gaz de France

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    The ''public utility'' contract aims at specifying the actions of Gaz de France (GdF), the French gas utility, in terms of national development and public utility presence at the local scale. It extends and completes the 'contract of group' established between the government and GdF in the domain of quality of the services offered to clients, development of gas infrastructures and extension of gas supplies, and sustainable development. (J.S.)

  20. Proceedings of the NATO IST-128 Workshop: Assessing Mission Impact of Cyberattacks Held in Istanbul, Turkey on 15-17 June 2015

    Science.gov (United States)

    2015-12-01

    the NATO IST-128 Workshop: Assessing Mission Impact of Cyberattacks 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6...2001. [7] John Surdu, Kevin Kittka, “The Deep Green Concept,” Spring Simulation Multiconference, 2008. [8] Lieutenant General Edward Cardon

  1. [3H]QNB binding and contraction of rabbit colonic smooth muscle cells

    International Nuclear Information System (INIS)

    Ringer, M.J.; Hyman, P.E.; Kao, H.W.; Hsu, C.T.; Tomomasa, T.; Snape, W.J. Jr.

    1987-01-01

    The authors used radioligand binding and studies of cell contraction to characterize muscarinic receptors on dispersed smooth muscle cells from rabbit proximal and distal colon. Cells obtained after serial incubations in collagenase were used to measure binding of tritiated quinuclidinyl benzilate ([ 3 H]QNB). At 37 degree C, specific [ 3 H]QNB binding was saturable and linearly related to cell number. Nonlinear regression analysis was used to determine the affinity of [ 3 H]QNB for its receptor. The IC 50 for the muscarinic agonists bethanechol and oxotremorine were 80 and 0.57 μM, respectively. Hill coefficients were 0.67 for both, suggesting more complex interaction involving receptors of different affinities. In studies of cell contraction, bethanechol stimulated a dose-dependent decrease in cell length with half the maximal contraction occurring at 100 pM. These results suggest that (1) contraction is mediated by binding of bethanechol to M 2 -muscarinic receptors and that (2) there are a large number of spare receptors in colonic smooth muscle

  2. On contact numbers in random rod packings

    NARCIS (Netherlands)

    Wouterse, A.; Luding, Stefan; Philipse, A.P.

    2009-01-01

    Random packings of non-spherical granular particles are simulated by combining mechanical contraction and molecular dynamics, to determine contact numbers as a function of density. Particle shapes are varied from spheres to thin rods. The observed contact numbers (and packing densities) agree well

  3. Brazilian energy balance 2002: calendar year 2001

    International Nuclear Information System (INIS)

    2002-12-01

    The Brazilian Energy Balance 2002, based on 2001 data, contains the information related to the supply and consumption of the primary and secondary energy sources, provided by data and information of responsible sectors. This version presents important differences in relation to the previous editions, new technical concepts were introduced for the treatment of calorific powers of energy sources in the composition and consolidation of data, and also in the structure of its contents. The Balance 2002 was structured in the same way of the last edition, divided in 8 chapters, as follows: summary of the relevant indicators of 2001 and consolidated data of production, consumption and external dependence on energy, and also the sectorial composition of the consumption of the different groups of energy sources - period 1970/2001; energy supply and demand by source - 1986/2001; energy consumption by sector - 1986/2001; energy foreign trading - 1986/2001; transformation centers balances - 1986/2001; energy resources and reserves - 1973/2001; energy and socio-economy - 1986/2001; regional parameters and appendices including: installed capacity, international data, general structure of the balance, information processing, conversion units and consolidated energy balances - 1970/2001,in the 'kcal' unit, calculated in PCI- Inferior Calorific Power. This new model has the intention to approximate the Brazilian Energy Balance to the international methodologies, mainly to the OECD balances

  4. Reviving Ulysses contracts.

    Science.gov (United States)

    Spellecy, Ryan

    2003-12-01

    Ulysses contracts have faced paternalism objections since they first were proposed. Since the contracts are designed to override a present request from a legally competent patient in favor of a past request made by that patient, enforcement of these contracts was argued to be unjustifiable strong paternalism. Recent legal developments and new theories of practical reasoning suggest that the discussion of Ulysses contracts should be revived. This paper argues that with a proper understanding of the future-directed planning embodied in Ulysses contracts, the charge of strong paternalism can be answered, and the enforcement of some Ulysses contracts may be justified under the rubric of weak paternalism.

  5. Defense Horizons. Number 79, April 2015

    Science.gov (United States)

    2015-04-01

    law , no person shall be subject to a penalty for failing to comply with a collection of information if it does not display a currently valid OMB...79, April 2015 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT...aggression. Even more issues emerged following the downing of Malaysian Airlines Flight 17 over Ukraine in July 2014, and cross-border ar- tillery renewed

  6. 41 CFR 101-30.101-3 - National stock number.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true National stock number. 101-30.101-3 Section 101-30.101-3 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 30-FEDERAL CATALOG SYSTEM 30...

  7. 41 CFR 115-1.109 - Numbering in FPMR system.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Numbering in FPMR system. 115-1.109 Section 115-1.109 Public Contracts and Property Management Federal Property Management Regulations System (Continued) ENVIRONMENTAL PROTECTION AGENCY 1-INTRODUCTION 1.1-Regulation System § 115-1...

  8. 41 CFR 101-1.109 - Numbering in FPMR System.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Numbering in FPMR System. 101-1.109 Section 101-1.109 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 1-INTRODUCTION 1.1-Regulation System § 101...

  9. Proposal for the award of a contract for the supply and installation of pipelines for the LHC accelerator tunnel

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply and installation of pipelines for the LHC accelerator tunnel. Following a market survey carried out among 92 firms in fifteen Member States, a call for tenders (IT-2682/ST/LHC) was sent on 7 September 2001 to seven firms, seven consortia consisting of two firms and three consortia consisting of four firms, in twelve Member States. By the closing date, CERN had received 11 tenders from five firms and six consortia in ten Member States. The Finance Committee is invited to agree to the negotiation of a contract with RENCO (IT), the lowest compliant bidder, for the supply and installation of pipelines for the LHC accelerator tunnel for a total amount of 21 995 304 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: IT - 100%.

  10. Collective hydrodynamic communication through ultra-fast contractions

    Science.gov (United States)

    Bhamla, Saad; Mathijssen, Arnold; Prakash, Manu

    2017-11-01

    The biophysical relationships between physiological sensors and actuators were fundamental to the development of early life forms, as responding to external stimuli promptly is key to survival. We study an unusual protist Spirostomum ambiguum, a single-celled organism that can grow up to 4mm in size, visible to the naked eye, as a model system for impulsive systems. Coiling its cytoskeleton, this ciliate can contract its long body within milliseconds, one of the fastest accelerations known in cell biology. We demonstrate that these rapid contractions generate long-ranged vortex flows that can trigger other cells to contract, repeatedly, which collectively leads to an ultra-fast hydrodynamic signal transduction across a colony that moves hundreds of times faster than the swimming speed. By combining high-speed PIV experiments and analytical modelling we determine the critical rheosensitivity required to sustain these signal waves. Whereas the biological motive is not fully understood, contractions are known to release toxins from membrane-bound extrusomes, thus we hypothesize that synchronised discharges could facilitate the repulsion of large-scale predators cooperatively. Please also see our other talk ``Rheosensing by impulsive cells at intermediate Reynolds numbers''.

  11. 24 CFR 983.206 - HAP contract amendments (to add or substitute contract units).

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract amendments (to add or... Contract § 983.206 HAP contract amendments (to add or substitute contract units). (a) Amendment to substitute contract units. At the discretion of the PHA and subject to all PBV requirements, the HAP contract...

  12. Administrative contracts

    Directory of Open Access Journals (Sweden)

    Vukićević-Petković Milica

    2015-01-01

    Full Text Available Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete understanding of the importance and essence of this institution as well as the need for its complete legal regulation.

  13. New solvent extraction processes for minor actinides: CIEMAT contribution to the partnew project: EU contract n. FIKW-CT2000-0087: first semestral period 2001 september 2000-february 2001

    International Nuclear Information System (INIS)

    2002-01-01

    This report includes the work developed at CIEMAT into the partnew project: '' New solvent extraction processes for minor actinides, during the first semestral period (september 2000 to february 2001), CIEMAT is involved in the following task: the study of the actinides (AN) and lanthanides (LN) extracting properties of new compounds with chemical structure based on two malonamide groups linked to an aromatic platform. The study of new-bearing extractants with chemical structure similar to malonamides aforementioned, changing the 0 atoms by s atoms, and the determination of the selectivity of these new thiomalonamides for AN(III) extraction. (Author)

  14. Educational Technology Research Journals: "The Internet and Higher Education", 2001-2010

    Science.gov (United States)

    Drysdale, Jeffery S.; Matthews, Michael; Terekhova-Nan, Vera; Woodfield, Wendy; West, Richard E.

    2013-01-01

    This article analyzes articles published in "The Internet and Higher Education" from 2001-2010. The researchers analyzed the frequency of author-provided keywords and common abstract words, type and frequency of authorship, the type of research method employed, and the number of citations the journal and specific articles received. Words…

  15. 77 FR 23369 - Federal Acquisition Regulation; Justification and Approval of Sole-Source 8(a) Contracts

    Science.gov (United States)

    2012-04-18

    ... Business Administration (SBA) may not accept a sole- source 8(a) contract in excess of $20 million for... is no conflict with the law. Execution of the J&A prior to the SBA's initiation of contract... small number of businesses that have been awarded 8(a) contracts over the $20 million threshold may be...

  16. Army Contract Specialists’ Lack of Desire to Become Contracting Officers

    Science.gov (United States)

    2012-05-01

    response to question 2 was 1 or 2, choose all the responses that support the reasoning for your answer. B ). N o t en o u g h w el l tr ai n ed...contracting specialist set the goal of becoming a contracting officer? ACC 20 Contracting officer burnout Consider contracting officer rotations every 2 to

  17. Proposal for the award of three contracts for the provision of temporary labour on the Swiss part of the CERN site

    CERN Document Server

    2002-01-01

    This document concerns the award of three contracts for the provision of temporary labour on the Swiss part of the CERN site. Following a market survey carried out among 71 firms in thirteen Member States, a call for tenders (IT-2875/HR) was sent on 11 July 2001 to nine firms and six consortia, one consisting of three firms, five consisting of two firms, in eight Member States. By the closing date, CERN had received 12 tenders from eight firms and four consortia in five Member States. The Finance Committee is invited to agree to the negotiation of three contracts for the provision of temporary labour on the Swiss part of the CERN site with CONSULTOR (PL), ADECCO (CH) and FLEX-FORCE (CH)/TEMP-TEAM (NO). The total maximum amount for all three contracts is, for an initial period of three years starting 1 July 2002, 5 500 000 Swiss francs, subject to revision for inflation from 1 January 2003. The contracts will include an option for two further one-year extensions beyond the initial three-year period. The firms ...

  18. Reference document 2001. A (AREVA) for..; Document de reference 2001. A (AREVA) comme..

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This reference document 2001, on the group Areva, provides data and information on the Areva emerges, overview of operations, sustainable development policy, research and development programs, nuclear power activities (front-end, reactors and services back-end divisions), components (connectors division and STMicroelectronics, human resources, share data and financial information (financial report 2001, financial report first-half 2002). (A.L.B.)

  19. Risø årsberetning 2001

    DEFF Research Database (Denmark)

    2002-01-01

    I denne årsberetning præsenteres et lille udpluk af Risøs resultater i 2001. En mere detaljeret gennemgang af Risøs projekter findes i Risøs Virksomhedsregnskab for 2001 samt i forskningsafdelingernes egne årsberetninger....

  20. Congenital rubella syndrome and autism spectrum disorder prevented by rubella vaccination - United States, 2001-2010

    Directory of Open Access Journals (Sweden)

    Omer Saad B

    2011-05-01

    Full Text Available Abstract Background Congenital rubella syndrome (CRS is associated with several negative outcomes, including autism spectrum disorders (ASDs. The objective of this study was to estimate the numbers of CRS and ASD cases prevented by rubella vaccination in the United States from 2001 through 2010. Methods Prevention estimates were calculated through simple mathematical modeling, with values of model parameters determined from published literature. Model parameters included pre-vaccine era CRS incidence, vaccine era CRS incidence, the number of live births per year, and the percentage of CRS cases presenting with an ASD. Results Based on our estimates, 16,600 CRS cases (range: 8300-62,250 were prevented by rubella vaccination from 2001 through 2010 in the United States. An estimated 1228 ASD cases were prevented by rubella vaccination in the United States during this time period. Simulating a slight expansion in ASD diagnostic criteria in recent decades, we estimate that a minimum of 830 ASD cases and a maximum of 6225 ASD cases were prevented. Conclusions We estimate that rubella vaccination prevented substantial numbers of CRS and ASD cases in the United States from 2001 through 2010. These findings provide additional incentive to maintain high measles-mumps-rubella (MMR vaccination coverage.

  1. Inflation Forecast Contracts

    OpenAIRE

    Gersbach, Hans; Hahn, Volker

    2012-01-01

    We introduce a new type of incentive contract for central bankers: inflation forecast contracts, which make central bankers’ remunerations contingent on the precision of their inflation forecasts. We show that such contracts enable central bankers to influence inflation expectations more effectively, thus facilitating more successful stabilization of current inflation. Inflation forecast contracts improve the accuracy of inflation forecasts, but have adverse consequences for output. On balanc...

  2. [Salary and clinical productivity among physicians in Norwegian somatic hospitals 2001-2008].

    Science.gov (United States)

    Johannessen, Karl-Arne

    2010-09-23

    Analysis of the future need for medical doctors necessitates an assessment of their productivity. The goals of this study were to analyze the relation between doctors' work force and the increased activity in hospitals, and to describe the development of working hours and salary for hospital doctors in a gender perspective. Information about man-labour years, working time and salary for doctors in Norwegian somatic hospitals was retrieved for the period 2001-2008. Number of hospital stays, DRG points and outpatient consultations per man-labour year are used as measures of doctors' clinical productivity. The percentage of female doctors increased from 34.7 % to 42.2 %. The mean annual salary increased more for men (14.4 % higher in 2001 and 16.6 % higher in 2008) than women. Total salary costs for doctors increased by 69.9 % (from 3.66 bill to 6.22 bill. NOK); 42.6 % of this increase was generated by new positions (1 306 man-labour years, + 21.2 %). Labour years from extended working hours increased by 6.8 % (constituting 1043 labour years in 2008; 12.2 % of the total), but the average extended labour time per doctor decreased (-16.7 % for women and -9.6 % for men). The number of hospital stays increased by 13.2 %, DRG points increased by 12.4 % and outpatient consultations increased by 9.3 % per doctor's work year in the period 2001-2008. Higher salaries for men may be explained by age, more men in senior positions and longer working hours than for women. The productivity of Norwegian doctors still increased from 2001 to 2008 (taking into account the increase in salary).

  3. Caernarvon 2001

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Sampled marshes and ponds along two transects within the intermediate and brackish marsh zones of Breton Sound, Louisiana, from May 7-11, 2001. Sampling followed...

  4. Synthesis and Functionalization of Atomic Layer Boron Nitride Nanosheets for Advanced Material Applications

    Science.gov (United States)

    2014-06-05

    PAGES 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 5c. PROGRAM ELEMENT NUMBER 5b. GRANT NUMBER 5a. CONTRACT NUMBER Form Approved OMB...Phys., 89, (2001) 5243. [14] M. Depas, R. L. Van Meirhaegue, W. H. Laflère, F. Cardon , Solid- State Electron, 37, (1994) 433. [15] Muhammad Sajjad

  5. Earth sciences. 1990-2001. International Atomic Energy Agency publications

    International Nuclear Information System (INIS)

    2001-05-01

    This catalogue lists all sales publications of the International Atomic Energy Agency dealing with Earth Sciences and issued during the period 1 January 1990 - 31 May 2001. Most publications are issued in English, though some are also available in other languages. This is noted as A for Arabic, C for Chinese, E for English, F for French, R for Russian and S for Spanish before the relevant ISBN number

  6. Positive and negative implications entailed by fixed-term employment contracts

    Directory of Open Access Journals (Sweden)

    Mihaela-Emilia Marica

    2018-03-01

    Full Text Available Generally, fixed-term employment contracts are seen as a stepping stone to permanent employment; they have become popular among the flexible forms of work contracts, and are the object of an increasing number of debates and assessments, investigating both the respective legislation and the specific consequences on the parties concluding a fixed-term employment contract. Despite the positive aspects of temporary employment – a positive effect on the rate of employment, and the common perception of such contracts as a preliminary step to permanent employment, as well as the flexibility they bring to the labor market – one cannot ignore the negative implications of fixed-term contracts on the nature of the employment relationship, the system of social protection, the working conditions, the economic security, and the job stability. Based on these considerations, the present paper investigates the advantages and disadvantages of the individual fixed-term employment contract from the standpoints of both employers and employees. Obviously, this approach aims to explore the usefulness and importance of these contract types, as means for balancing the needs of employers and employees on the labor market, and for identifying concrete instances that justify the liberalization of fixed-term employment, despite all the inherent risks entailed by any type of non-standard work: lack of job security; reduced social protection and security for those concluding such a contract.

  7. Governance in Blockchain Technologies & Social Contract Theories

    Directory of Open Access Journals (Sweden)

    Wessel Reijers

    2016-12-01

    Full Text Available This paper is placed in the context of a growing number of social and political critiques of blockchain technologies. We focus on the supposed potential of blockchain technologies to transform political institutions that are central to contemporary human societies, such as money, property rights regimes, and systems of democratic governance. Our aim is to examine the way blockchain technologies canbring about - and justify - new models of governance. To do so, we draw on the philosophical works of Hobbes, Rousseau, and Rawls, analyzing blockchain governance in terms of contrasting social contract theories. We begin by comparing the justifications of blockchain governance offered by members of the blockchain developers’ community with the justifications of governance presented within social contract theories. We then examine the extent to which the model of governance offered by blockchain technologies reflects key governance themes and assumptions located within social contract theories, focusing on the notions of sovereignty, the initial situation, decentralization and distributive justice.

  8. Report on the Elderly 2001

    NARCIS (Netherlands)

    M.M.Y. de Klerk; J.M. Timmermans

    2001-01-01

    (Full translation from the Dutch: Rapportage Ouderen 2001) Report on the Elderly 2001 presents an overview of the position of the elderly in Dutch society. The central themes of the Report are participation in education and the labour market, financial status, housing situation,

  9. Proposal for the award of blanket contracts for the supply of Intel-based desktop PCs, display monitors and portable PCs

    CERN Document Server

    2000-01-01

    This document concerns the award of blanket contracts for the supply of the three following categories of equipment for the period 2001-2004: a) desktop PCs (complete PC systems but without display monitors), b) display monitors (conventional CRTs or flat screen LCDs) and c) portable PCs (also called notebooks or laptops). Following a market survey carried out among 41 firms in fourteen Member States, an invitation to tender (IT-2692/IT) was sent on 19 May 2000 to 12 firms and three consortia, each consisting of two firms, in five Member States. By the closing date, CERN had received seven tenders, all from the Swiss subsidiaries of the firms and consortia. The Finance Committee is invited to agree to the negotiation of - blanket contracts with VOBIS (CH), ELONEX (CH) and FUJITSU-SIEMENS (CH), the three lowest bidders complying with the specification, for the supply of Desktop PCs; - blanket contracts with VOBIS (CH), SYNOPTIC (CH) and ELONEX (CH), the three lowest bidders offering display monitors manufactur...

  10. Reconciling Contracts and Relational Governance through Strategic Contracting

    DEFF Research Database (Denmark)

    Petersen, Bent; Østergaard, Kim

    2018-01-01

    on contract types, such as strategic versus conventional, may reconcile the enduring research controversy between the substitution and complements perspectives. Practical implications: Today, formal contracts with foreign distributors tend to resemble “prenuptial agreements”. The opportunity for relational...

  11. Grounds for dispensing with public tender procedures in Government Contracting

    Directory of Open Access Journals (Sweden)

    P Bolton

    2006-01-01

    Full Text Available The Constitution of the Republic of South Africa1 provides that organs of state must comply with five principles when procuring goods or services: procurement procedures must be fair, equitable, transparent, competitive and cost-effective. In short, this means that organs of state should make use of competition when procuring goods or services. They should shop around and attract the maximum number of contractors who will participate in such competition. The aim should be the attainment of value for money, meaning, public money should be spent in an effective and efficient manner. Those who participate in competitions should also be treated fairly and without bias. In principle, no preferences should be afforded to different contractors; all contracting parties should have equal access to competition; some contractors should not be afforded more time for the preparation and submission of quotes or tenders than others; and the same information should be made available to all contracting parties. Government procurement procedures should further be transparent, meaning public or open. Thus, organs of state should not contract behind closed doors – government contracts should, as a rule, be advertised. Depending on the nature and value of a particular contract, the use of a public call for tenders is generally the best way to ensure compliance with the principles in the Constitution. By nature, a pubic call for tenders is open, it assists in the prevention of fraud and favouritism, and it ensures that the maximum number of contractors is approached to compete for a contract.Organs of state can also compare prices and quality and can contract with whoever offers the best deal. Most legislation therefore proceeds on the basis that procurement takes place by way of tendering. Generally, contracts above R200 000 are subject to public tender procedures. In certain instances, however, a public call for tenders may be inappropriate regardless of the high

  12. The Contract Management Body of Knowledge: A Comparison of Contracting Competencies

    Science.gov (United States)

    2013-12-01

    and supply chain management policies in an effort to deliver higher returns for their companies ( KPMG , 2012). As purchasing becomes increasingly more...conservation, hazardous materials , and ozone-depleting substances (NCMA, 2011). Contract Structures (1.5) has to do with identifying specific contract types...discusses time and material contracts as well as cost, performance, and delivery incentives. Incentive and award-fee contracts pertaining to fixed-price

  13. HARMONIZATION OF THE CONSUMER CONTRACT DISPOSITIONS WITH THE GENERAL CONTRACT RULES

    Directory of Open Access Journals (Sweden)

    Alexandru MATEESCU

    2016-05-01

    Full Text Available This work contains and mainly tackles the contract of consumption, its differences and similitudes to a general contract, manners of applying it, and the way in which the former can be better coordinated and correlated to the general contracting terms, established by the civil law. Along the years, the consumption contract has undergone several addenda and it has come to represent an instrument of both refference and regulation for the socio-economical relations between two parties who have a commercial agreement. The general law frame has had a great influence in the development of the consumption contract, as well as on its applicability conditions and its manner of deployment. Through the development of the judicial law concerning the contract of concumption, this type of agreement has influenced, through its human and social nature, both the general contract, and the specific frame it relates to. The relationship between the two types of contract is one of interdependence, which is determined by the need of judicial regulation in the Romanian and European economy. The ceaselees development of interhuman relations pushes society towards maintaining a continuous study of the advancement of specific legislation and judicial regulation. The main purpose of this work is analyzing the general judicial frame and the way in which the differences between the general contract and the consumption one may represent a benefic and mutual influence on protecting the citizens’ rights, which in the case of the consumption contract encompasses the protection of consumers’ rights. Also, it will analyze the aspects that determine the manner of application and the the differences that can be surmounted in order to achieve a better cohesion between these types of contracts.

  14. A third generation of performance contracting in danish central government?

    DEFF Research Database (Denmark)

    Kristiansen, Mads Bøge

    2017-01-01

    This paper compares the content of performance contracts in Danish central government over time in order to identify whether – and if so, how – it develops. The analysis is conducted as a two-step, mixed methods study. First, a quantitative study was carried out based on a study of all performance...... contracts in Danish central government in 2002, 2006, 2009, 2012 and 2014. For each year, all performance contracts have been coded according to the number and type of targets included in them. A range of qualitative interviews was then carried out, and Ministry of Finance recommendations were consulted...... of outcomes has increased, activity-oriented targets have decreased, and targets for internal management decreased in the mid-2000s before again increasing more recently. On this basis, performance contracting in Danish central government is argued to have entered a third generation....

  15. 48 CFR 227.7009-3 - Additional clauses-contracts except running royalty contracts.

    Science.gov (United States)

    2010-10-01

    ...-contracts except running royalty contracts. 227.7009-3 Section 227.7009-3 Federal Acquisition Regulations...—contracts except running royalty contracts. The following clauses are examples for use in patent release and settlement agreements, and license agreements not providing for payment by the Government of a running...

  16. Primary contraction of skin grafts: a porcine preliminary study

    Directory of Open Access Journals (Sweden)

    Alexander Bogdanov Berezovsky

    2015-03-01

    Full Text Available Aim: Skin grafting is a common clinical practice for plastic surgeons, yet primary contraction of these grafts is a neglected topic. This study was designed to investigate primary contraction and introduce the shape of skin graft as a possible factor that modifies primary contraction behavior, using porcine models. Methods: In the first series, full-thickness skin grafts (FTSGs and split-thickness skin grafts (STSGs were compared. In a second series, how the shape of the skin graft affected the degree of contraction was examined. Results: The mean percentage of FTSG shrinkage was 12.04%, and the median was 12.18%. The mean percentage of STSG shrinkage was 6.87%, and the median was 5%. Circle-shaped and square-shaped FTSGs showed mean/median graft shrinkage of 5.83%/6.93% and 4.15%/3.75%, respectively. In STSGs, the circle-shaped and square-shaped grafts had mean/median graft shrinkage of 1.07%/0% and 0.31%/0%, respectively. Conclusion: Our preliminary report revealed an expected greater shrinkage of FTSGs compared with STSGs. Furthermore, in a limited number of specimens, the shape of the skin graft seemed to affect the primary contraction of the STSGs.

  17. 1998-2001 Scientific Technological Report; Informe Cientifico Tecnologico 1998-2001

    Energy Technology Data Exchange (ETDEWEB)

    Gayoso C, C; Ezpinoza Z, M; Prado C, A; Robles N, A [eds.

    2002-07-01

    IPEN has elaborated the 1998-2001 Scientific-Technological Report as a result of several research and development works within the fields of production and services, and related with mining, archaeology, agriculture, biology, industry and medicine as well with tracer techniques in industry, welding quality control, speed and underground waters flows, direction, water treatment, environmental pollution, geothermy, production and calibration of radioactive sources, X-rays equipment quality control, neutron physics, neutron radiography, neutron activation analysis, water traces analysis, crystal growth and building of nuclear equipment. The 1998-2001 Scientific-Technological Report includes 148 papers divided in 8 subject matters: Nuclear and Reactor Physics, Nuclear Chemistry, Nuclear Engineering, Materials, Nuclear Safety, Protection and Radiological Safety, Nuclear Applications, and Rules and Regulation.

  18. 32 CFR 2001.1 - Purpose and scope.

    Science.gov (United States)

    2010-07-01

    ... Telecommunications, automated information systems, and network security 4.1, 4.2 2001.51 Technical security 4.1 2001... National Defense Other Regulations Relating to National Defense INFORMATION SECURITY OVERSIGHT OFFICE, NATIONAL ARCHIVES AND RECORDS ADMINISTRATION CLASSIFIED NATIONAL SECURITY INFORMATION Scope of Part § 2001...

  19. Drilling contract issues

    International Nuclear Information System (INIS)

    Davison, G.B.; Worden, D.R.; Borbridge, G.K.D.

    1997-01-01

    Some selected issues which are facing both operators and contractors in drilling for oil and gas, such as the allocation of risk by contract and by statute and the implementation of new technologies, were discussed. There are three varieties of written drilling contracts used in Canada: (1) day work and meterage contracts, (2) master drilling agreements, and (3) contracts that are used in construction projects that do not specifically relate to drilling. Issues relevant to the contractual allocation of risk, to implementing new drilling technologies, to reconciling contract and statute liability, and the formation of strategic alliances for mutual benefit, and the factors contributing to the success of such alliances were explored. 12 refs

  20. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 86, quarter ending March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    Summaries are presented for 37 enhanced oil recovery contracts being supported by the Department of Energy. The projects are grouped into gas displacement methods, thermal recovery methods, geoscience technology, reservoir characterization, and field demonstrations in high-priority reservoir classes. Each summary includes the objectives of the project and a summary of the technical progress, as well as information on contract dates, size of award, principal investigator, and company or facility doing the research.

  1. Psychological contract in the light of flexible employment: The review of studies

    Directory of Open Access Journals (Sweden)

    Dorota Żołnierczyk-Zreda

    2016-08-01

    Full Text Available Changing employment relations between employees and employers due to the increasing employment flexibility have contributed to the development of a new paradigm to analyze these relations based on the concept of psychological contract. This paradigm might be particularly relevant in Poland where the employment flexibility understood as the number of workers with temporary contracts is the highest in Europe. In this paper the concept of psychological contract is presented along with the existing findings related to its range, balance and contract fulfilment vs. contract breach. The results of studies showing the differences in psychological contract of temporary and permanent workers are also presented. The majority of them indicate that psychological contracts of temporary workers are limited in their extent, less balanced and asymmetric (to workers’ disadvantage, as well as more transactional in their nature than those of permanent workers. The temporary workers’ well-being and attitudes towards work and their reaction to psychological contract breach largely depends on their preferences for this type of employment, on their qualifications and on a labor market situation. Med Pr 2016;67(4:529–536

  2. What constitutes the gas sales contract in the evolving marketplace?

    International Nuclear Information System (INIS)

    Hughes, T.M.

    1996-01-01

    A general overview of certain fundamental issues of contract law, which are relevant to gas sales transactions, was presented. Since deregulation, parties of the Canadian natural gas market are free to negotiate the terms of arrangements and contracts with any number of buyers and sellers. With deregulation also came a substantial increase in the amount of litigation regarding sales contracts. Two basic issues that should be kept in mind when negotiating any gas sales contract were letter agreements, (two versions of non-binding letters of intent), and requirement of writing. Within the requirements of writing one should be mindful of the legal implications of the fraud statutes, the Sale of Goods Act, what constitutes a sufficient note or memorandum, what constitutes the requisite signature, contracting out of the requirement of writing and signature on the mass agreement, certainty of terms, and the terms implied by legislation. It was considered advantageous for both buyers and sellers to continue to be vigilant about the contractual arrangements respecting all of their gas transactions

  3. Causes of mortality in laying hens in different housing systems in 2001 to 2004

    Directory of Open Access Journals (Sweden)

    Etterlin Pernille

    2009-01-01

    Full Text Available Abstract Background The husbandry systems for laying hens were changed in Sweden during the years 2001 – 2004, and an increase in the number of submissions for necropsy from laying hen farms was noted. Hence, this study was initiated to compare causes of mortality in different housing systems for commercial laying hens during this change. Methods Based on results from routine necropsies of 914 laying hens performed at the National Veterinary Institute (SVA in Uppsala, Sweden between 2001 and 2004, a retrospective study on the occurrence of diseases and cannibalism, i.e., pecking leading to mortality, in different housing systems was carried out. Using the number of disease outbreaks in caged flocks as the baseline, the expected number of flocks with a certain category of disease in the other housing systems was estimated having regard to the total number of birds in the population. Whether the actual number of flocks significantly exceeded the expected number was determined using a Poisson distribution for the variance of the baseline number, a continuity correction and the exact value for the Poisson distribution function in Excel 2000. Results Common causes of mortality in necropsied laying hens included colibacillosis, erysipelas, coccidiosis, red mite infestation, lymphoid leukosis and cannibalism. Less common diagnoses were Newcastle Disease, pasteurellosis and botulism. Considering the size of the populations in the different housing systems, a larger proportion of laying hens than expected was submitted for necropsy from litter-based systems and free range production compared to hens in cages (P P P Conclusion The results of the present study indicated that during 2001–2004 laying hens housed in litter-based housing systems, with or without access to outdoor areas, were at higher risk of infectious diseases and cannibalistic behaviour compared to laying hens in cages. Future research should focus on finding suitable prophylactic

  4. Nuclear safety in France in 2001; La surete nucleaire en France en 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This press dossier summarizes the highlights of nuclear safety in France in 2001: the point-of-view of A.C. Lacoste, director of the French authority of nuclear safety (ASN), the new organisation of the control of nuclear safety and radiation protection, the ASN's policy of transparency, the evolutions of nuclear fuels and the consistency of the fuel cycle, the necessary evolutions of the nuclear crisis management, the harmonizing work of safety approaches carried out by the WENRA association. The following documents are attached in appendixes: the decrees relative to the reformation of the nuclear control in France, the missions of the ASN, the control of nuclear safety and radiation protection in France, the organization of ASN in March 2000, the incidents notified in 2001, the inspections performed in 2001, and the list of the main French nuclear sites. (J.S.)

  5. Intellektika 2001 - Tartu "Teeviit" / Raivo Juurak

    Index Scriptorium Estoniae

    Juurak, Raivo

    2001-01-01

    16.-17. veebr. 2001 toimus Tartus haridus- ja teadusmess "Intellektika 2001", kus osales 291 hariduse ja teadusega seotud organisatsiooni. Kuna osalejate seas oli rohkesti õppeasutusi, nimetati messi ka Tartu "Teeviidaks"

  6. Proceedings of the IRI Task Force Activity 2001

    International Nuclear Information System (INIS)

    Radicella, S.M.

    2002-08-01

    This ICTP Internal Report contains the list of papers presented, activity report and the write up of a number of presentations delivered during the International Reference Ionosphere (IRI) Task Force Activity 2001 which took place at the Abdus Salam ICTP during May 2001, particularly centred in the week from 21-25 May. The 2001 Task Force Activity is the eighth successful encounter of specialists organized by the URSI-Cospar IRI Working Group and the Aeronomy and Radiopropagation Laboratory of the Abdus Salam International Centre for Theoretical Physics of Trieste, Italy. This project continues the IRI Task Force Activities at the Abdus Salam International Centre for Theoretical Physics (ICTP) in Trieste, Italy. The primary focus of this activity was the development of a specification model for ionospheric variability. Such a model is high on the wish list of users of ionospheric models. Climatological models like IRI provide monthly mean values of ionospheric parameters. Understandably a satellite designer or operator needs to know not only the monthly average conditions but also the expected deviations from these mean values. The main discussions and presentations took place during the week 21-25 May. The format was similar to last year's activity with presentations and round-table discussions in the morning and follow-on work in small subgroups in front of computer terminals in the afternoon. This Proceedings contains also four papers of the previous IRI Task Force Activity which were omitted

  7. Unfair contract terms in B2C contracts

    NARCIS (Netherlands)

    Hesselink, M.W.; Loos, M.B.M.

    2012-01-01

    Because of its textual similarity to the Unfair Terms Directive 1993, Chapter 8 of the proposed CESL, on ‘Unfair contract terms’, can benefit from two decades of interpretative experience which is likely to provide a comparably high degree of instant legal certainty to contracting parties.

  8. The Corporations Act 2001

    OpenAIRE

    Bostock, Tom

    2002-01-01

    The author outlines reforms made in Australia in the area of company law with an analysis of the Corporations Act 2001, which along with the Australian Securities and Investments Commission Act 2001 comprises Corporations legislation in Australia. Article by Tom Bostock (a partner in the law firm Mallesons Stephen Jaques, Melbourne, Australia). Published in Amicus Curiae - Journal of the Institute of Advanced Legal Studies and its Society for Advanced Legal Studies. The Journal is produced by...

  9. Airline Quality Rating 2001

    OpenAIRE

    Bowen, Brent D.; Headley, Dean E.

    2001-01-01

    The Airline Quality Rating (AQR) was developed and first announced in early 1991 as an objective method of comparing airline quality on combined multiple performance criteria. This current report, Airline Quality Rating 2001, reflects monthly Airline Quality Rating scores for 2000. AQR scores for the calendar year 2000 are based on 15 elements that focus on airline performance areas important to air travel consumers. The Airline Quality Rating 2001 is a summary of month-by-month quality ra...

  10. Teaching about Contracts.

    Science.gov (United States)

    Froman, Michael; Kosnoff, Kathy

    1978-01-01

    Presents teaching strategies for introducing high school students to contract law. Offers as a case study a contract agreement between pro football players and team owners. Stresses basic elements of contracts (offer, acceptance, consideration, and understanding the bargaining process). Journal available from the American Bar Association, 1155…

  11. IAEA research contracts. Fourth annual report

    International Nuclear Information System (INIS)

    1964-01-01

    This volume represents the fourth annual report on the results obtained under the Agency's research contract programme. During the short life of this programme, which is not quite six years old, a total investment of more than three million dollars has been made to support research in selected fields at institutes in 50 Member States. Extensive summaries are presented herein for all final reports relating to contracts which were completed during 1963. As it is the policy of the Agency to encourage publication in the open scientific literature of the results of work done under research contracts, a number of papers have also appeared in the appropriate journals - the Agency having been notified of 75 such publications in 1963. A complete list of references to these is given at the end of this report. The scientific data presented in the summaries of course remain the responsibility of the contractor. The Agency, however, is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine

  12. IAEA research contracts. Fourth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1964-04-01

    This volume represents the fourth annual report on the results obtained under the Agency's research contract programme. During the short life of this programme, which is not quite six years old, a total investment of more than three million dollars has been made to support research in selected fields at institutes in 50 Member States. Extensive summaries are presented herein for all final reports relating to contracts which were completed during 1963. As it is the policy of the Agency to encourage publication in the open scientific literature of the results of work done under research contracts, a number of papers have also appeared in the appropriate journals - the Agency having been notified of 75 such publications in 1963. A complete list of references to these is given at the end of this report. The scientific data presented in the summaries of course remain the responsibility of the contractor. The Agency, however, is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture and medicine.

  13. CAT-ASVAB Technical Bulletin Number 1

    Science.gov (United States)

    2006-03-01

    CAT -ASVAB Technical Bulletin #1 Personnel Testing Division Defense Manpower Data Center March 2006 Report...2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE CAT -ASVAB Technical Bulletin #1 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c...Hetter, R. D. "Psychometric Procedures for Administering CAT -ASVAB" (pp. 131-140) Chapter 4 Hetter, R. D., & Sympson J. B. "Item Exposure

  14. Epidemiology of multiple Acinetobacter outbreaks in The Netherlands during the period 1999-2001

    NARCIS (Netherlands)

    van den Broek, P. J.; Arends, J.; Bernards, A. T.; De Brauwer, E.; Mascini, E. M.; van der Reijden, T. J. K.; Spanjaard, L.; Thewessen, E. A. P. M.; van der Zee, A.; van Zeijl, J. H.; Dijkshoorn, L.

    An increase in the number of outbreaks of Acinetobacter infection was notified in The Netherlands during 1999-2001. The present study compared the outbreaks at the species and strain levels, and analysed the epidemiology and control measures at the different locations. For each institute, three

  15. Proceedings: Radiation Protection Technology Conference: Providence, RI, November 2001

    International Nuclear Information System (INIS)

    2002-01-01

    Health physics (HP) professionals within the nuclear industry are continually upgrading their respective programs with new methods and technologies. The move to shorter outages combined with a diminishing group of contract HP technicians and demanding emergent work makes such changes even more important. The EPRI Radiation Protection Technology Conference focused on a number of key health physics issues and developments

  16. Conformal maps and group contractions in nuclear structure

    International Nuclear Information System (INIS)

    Bonatsos, D.

    2011-01-01

    In mathematics, a conformal map is a function which preserves angles. We show how this procedure can be used in the framework of the Bohr Hamiltonian, leading to a Hamiltonian in a curved space, in which the mass depends on the nuclear deformation β, while it remains independent of the collective variable γ and the three Euler angles. This Hamiltonian is proved to be equivalent to that obtained using techniques of Supersymmetric Quantum Mechanics. Group contraction is a procedure in which a symmetry group is reduced into a group of lower symmetry in a certain limiting case. Examples are provided in the large boson number limit of the Interacting Boson Approximation (IBA) model by a) the contraction of the SU(3) algebra into the [R 5 ]SO(3) algebra of the rigid rotator, consisting of the angular momentum operators forming SO(3), plus 5 mutually commuting quantities, the quadrupole operators, b) the contraction of the O(6) algebra into the [R 5 ]SO(5) algebra of the γ-unstable rotator. We show how contractions can be used for constructing symmetry lines in the interior of the symmetry triangle of the IBA model. (author)

  17. Yearly energy balance sheets 2000-2001

    International Nuclear Information System (INIS)

    2003-01-01

    The total supply of energy during the year 2001 rose by 7 per cent compared with the year 2000, from 588 TWh to 630 TWh. The supply of nuclear power increased by 27 per cent, whereas electricity from waterpower has remained still at approximately 80 TWh. During the year 2001 Sweden exported 18,5 TWh electricity and the import was 11,1 TWh. The use of petroleum products for electricity production was nearly the same, 3,5 TWh during 2001 compared with 3,6 TWh during 2000. The production of heat from petroleum products increased from 3,2 TWh 2000 to 4,3 TWh 2001. The explanation to that is mainly the large increasing of heavy fuel oil in district heating plants. The use of energy during the year 2001 increased by nearly 1 per cent compared with the year 2000, from 391 TWh to 394 TWh. The use of coal, coke, biomass fuels and petroleum products decreased a little between the years, whereas the use of gases, district heating and electricity rises. The industrial sectors energy use decreases a bit from 156 TWh for the year 2000 to 152 TWh the year 2001. An increasing use of gases and district heating can nevertheless be seen. The energy use within transport sector rises from 87 TWh to 88 TWh. Within the household sector there is an increasing use of energy between the years with a total of 3 TWh, from 91 TWh to 94 TWh. The households continue to reduce their use of petroleum products. The use of electricity and district heating increases, by 6 per cent and 15 per cent respectively, between year 2000 and 2001

  18. Annual report 2001; Rapport annuel 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This document presents the activities and important subjects on researches and developments, of the CEA over the year 2001. The first part deals with the contribution of the CEA to the national defence, the development of the nuclear energy in a sustainable development context, the transfer of the technological innovation to the economical competition, the important programs in fundamental research, the environmental and radiation protection and the human resources. The second part presents the financial report. (A.L.B.)

  19. Pacific Lamprey Research and Restoration Project : Annual Report 2001.

    Energy Technology Data Exchange (ETDEWEB)

    Close, David A.

    2002-11-01

    Pacific lamprey (Lampetra tridentata) has significantly declined along the Oregon coast and in the Columbia River Basin (Downey et al. 1993; Close and Jackson 2001). Declines in adults can be partially attributed to hydroelectric dams, which have impeded passage of adult Pacific lamprey in the Columbia and Snake rivers, thus effecting larval recruitment in the basin. Adult pacific lamprey also declined in numbers in the Umatilla River, a tributary of the Columbia River. In addition to hydro power dams in the Columbia River, habitat alterations and chemical treatments have been involved in the collapse of Pacific lamprey populations in the Umatilla River. To initiate the restoration effort, CTUIR began developing a restoration plan in 1998. The goal of the lamprey research and restoration project is to restore natural production of Pacific lampreys in the Umatilla River to self-sustaining and harvestable level. This report is summarizing the studies and restoration efforts concluded in 2001.

  20. Mathematical Fuzzy Logic - State of Art 2001

    Czech Academy of Sciences Publication Activity Database

    Hájek, Petr

    2003-01-01

    Roč. 24, - (2003), s. 71-89 ISSN 0103-9059. [WOLLIC'2001. Brasília, 31.07.2001-03.08.2001] R&D Projects: GA MŠk LN00A056 Keywords : fuzzy logic * many valued logic * basic fuzzy logic BL Subject RIV: BA - General Mathematics http://www.mat.unb.br/~matcont/24_4.pdf

  1. Proposal for the award of a contract for the supply of analogue optoelectronic receiver modules for the CMS tracker

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for the supply of 12-channel analogue optoelectronic receiver modules for the CMS Tracker. Following a market survey carried out among 56 firms in seventeen Member States and four firms in two non-Member States, a call for tenders (IT-2810/EP/CMS) was sent on 29 June 2001 to one firm in a Member State and one firm in a non-Member State. By the closing date, CERN had received one tender. The Finance Committee is invited to agree to the negotiation of a contract with NGK INSULATORS (JP), the only bidder, for the supply of 4500 units of 12-channel analogue optoelectronic receiver modules for a total amount of 228 485 949 Japanese yen, not subject to revision until 31 December 2003. At the rate of exchange stipulated in the tender, this amount is equivalent to approximately 3 110 500 Swiss francs. CERN's contribution to the total cost is 1 863 967 Swiss francs. The firm has indicated the following distribution by country of the contract value covered by this adjudica...

  2. Proposal for the award of a contract for the provision of a high-speed data circuit to the USA

    CERN Document Server

    2001-01-01

    This document concerns the award of a contract for a high-speed data circuit for Wide Area Network (WAN) connectivity between CERN and the STARLIGHT Internet exchange in Chicago, USA. The contract will be negotiated on behalf of CERN and its partners, CNRS/IN2P3 (FR), the US Department of Energy (DoE) through the California Institute of Technology (Caltech), the US National Science Foundation (NSF), the Canadian high-energy physics community through Carleton University and the World Health Organisation in Geneva. Following a market survey carried out among 26 firms in nine Member States and three firms in the USA, a call for tenders (IT-2983/IT) was sent on 7 September 2001 to 17 firms in eight Member States. By the closing date, CERN had received 13 tenders from eight Member States. The Finance Committee is invited to agree to the negotiation, on behalf of CERN and its partners, of a contract for the provision of a high-speed data circuit to the USA, with KPNQWEST (NL), the lowest bidder (after realignment),...

  3. Fuels. Deliveries and consumption of fuels during 4th quarter 2001 and during 2001

    International Nuclear Information System (INIS)

    2002-01-01

    The total volume of oil product deliveries (excluded lubricants, bitumen etc.) from the oil companies was 3 per cent higher during 2001 compared with 2000. The deliveries of motor gasoline and diesel oil increased by 1 per cent. Domestic heating oil decreased by 2 per cent and heavy fuel oils increased by 17 per cent, all compared with 2000. Under the forth quarter 2001 the deliveries of oil products (excluded lubricants bitumen etc.) was 5 per cent higher compared with the same quarter 2000. The deliveries of domestic heating oil and heavy fuel oils increased by 4 per cent and 28 per cent respectively. Motor gasoline increased by 3 per cent while the deliveries of diesel oil decreased by 1 per cent. The consumption of fuels in mining and manufacturing decreased by 5 per cent during 2001 compared with 2000. Most of the reduction came from the lower use of domestic fuel in manufacture of pulp, paper and paper products, printing and publishing. The total consumption in mining and manufacturing was unchanged during the 4 th quarter 2001 compared with the same period 2000. The consumption of domestic fuels decreased by 6 per cent and the oil consumption increased by 11 per cent. Higher consumption of fuels in electricity, gas and district heating services. The consumption of fuels in electricity, gas and district heating services increased by 14 per cent 2001 compared with 2000. The consumption of domestic fuels raised with 12 per cent and the use of fossil fuels raised with 17 per cent. The highest increasing, 27 per cent, was found within the use of oil. Electricity, gas and district heating services increased there fuel consumption with 29 per cent during the 0 quarter 2001 compared with the same period 2000. The raise can be explained with the fact that the 4th quarter 2000 was unusually warm. The increasing is found both in the use of domestic and fossil fuels

  4. Negotiating Efficient PPP Contracts

    DEFF Research Database (Denmark)

    Tvarnø, Christina D.

    . An opportunity the member states should consider using when procuring a PPP. This paper looks at the negotiation and contracting of a PPP in an economic theoretical and EU public procurement perspective and discusses how to establish an efficient PPP contract under a strong public law doctrine. Governments......This paper concerns Public Private Partnership (PPP) contracts in concern to the coming new 2014/24IEU public procurement directive. The new EU public procurement directive gives the public authority the opportunity to negotiate PPPs much more when they are implemented in national law...... procurement law. Furthermore, the paper seeks to establish a connection between public law, private law and the efficient PPP contract by drawing upon economic theory and empirical contract data from UK, US and Danish partnering contracts from the construction industry and the aim of contracting joint utility...

  5. Risøs virksomhedsregnskab 2001. Opfølgning på planerne for året 2001

    DEFF Research Database (Denmark)

    2002-01-01

    Risøs Virksomhedsregnskab 2001 er en opfølgning på planerne for Risøs virksomhed i 2001. Risøs bestyrelse skal som led i resultatkontrakten med Ministeriet for Videnskab, Teknologi og Udvikling aflægge årlige rapporter om opfyldelsen af de fastlagteresultatkrav. Nærværende rapport indeholder data...

  6. VT National Land Cover Dataset - 2001

    Data.gov (United States)

    Vermont Center for Geographic Information — (Link to Metadata) The NLCD2001 layer available from VCGI is a subset of the the National Land Cover Database 2001 land cover layer for mapping zone 65 was produced...

  7. IAEA research contracts. Ninth annual report

    International Nuclear Information System (INIS)

    1969-01-01

    This volume is the seventh annual publication of the summaries of final reports received during 1968 in connection with contracts and agreements awarded by the IAEA Research Contract Programme. Ninety nine such summaries are included, thus bringing to 323 the total number published so far. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation

  8. IAEA research contracts. Ninth annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1969-06-01

    This volume is the seventh annual publication of the summaries of final reports received during 1968 in connection with contracts and agreements awarded by the IAEA Research Contract Programme. Ninety nine such summaries are included, thus bringing to 323 the total number published so far. In every case the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been most closely connected with the particular branch of research concerned. The scientific data are the responsibility of the contractor, though the Agency is responsible for any additional observations. The reports presented are related to research in the field of radioactive waste management and environmental sciences; health physics and radiation protection; radiobiology; safeguards methods; nuclear reactors physics and nuclear fuels; radioisotope applications in agriculture, medicine and hydrology, food preservation by irradiation.

  9. Organisational commitment in the era of the new psychological contract

    Directory of Open Access Journals (Sweden)

    Anthonie Theron

    2011-08-01

    Full Text Available The aim of this study was to investigate organisational commitment in an organisation that had recently experienced organisational restructuring (a merger. The psychological contract that exists between employees and organisations is brittle due to many organisational changes that stem from organisational restructuring.  When psychological contracts are breached, employees may experience reduced commitment to the organisation.  The target population for this study consisted of all employees working at three recently-merged higher education institutions in the Nelson Mandela Metropolis (n=100 and a self-administered questionnaire was distributed amongst staff.  The results indicated that an increase in the number of positive human resource management (HRM practices reported by respondents correlated with a decrease in violation and breach of the psychological contract, despite organisational restructuring.  It was further revealed that effective management of the psychological contract is crucial during organisational restructuring, in order to maintain the commitment and loyalty of employees.

  10. Duration in Production Contracts

    OpenAIRE

    MacDonald, James M.; Korb, Penelope J.

    2006-01-01

    We use 2003 and 2004 ARMS data to analyze variations in contract duration among growers of broilers who hold production contracts. Most contracts cover just a single flock, but many extend for 1-2 years, and a significant minority of broiler contracts specify lengths of 5, 10, and even 15 years. We find that grower debt and production volume are inversely related to the choice of a short term (a year or less) contract, while lengthy prior experience with the contractor promotes short term con...

  11. Polytope Contractions within Weyl Group Symmetries

    Energy Technology Data Exchange (ETDEWEB)

    Szajewska, Marzena, E-mail: m.szajewska@math.uwb.edu.pl [University of Bialystok, Institute of Mathematics (Poland)

    2016-09-15

    A general scheme for constructing polytopes is implemented here specifically for the classes of the most important 3D polytopes, namely those whose vertices are labeled by integers relative to a particular basis, here called the ω-basis. The actual number of non-isomorphic polytopes of the same group has no limit. To put practical bounds on the number of polytopes to consider for each group we limit our consideration to polytopes with dominant point (vertex) that contains only nonnegative integers in ω-basis. A natural place to start the consideration of polytopes from is the generic dominant weight which were all three coordinates are the lowest positive integer numbers. Contraction is a continuous change of one or several coordinates to zero.

  12. Performance-based contracting for maintaining transportation assets with emphasis on bridges

    Directory of Open Access Journals (Sweden)

    Alsharqawi Mohammed

    2017-01-01

    Full Text Available With a large number of aging transportation infrastructure assets in North America and the growing problem of deterioration across the globe, managing these assets have been the subject of ongoing research. There is an overwhelming amount of maintenance and rehabilitation works to be done and selecting a suitable maintenance, repair or replacement (MRR strategy is one of the most challenging tasks for decision makers. Limited budget and resources are even making the decision making process more challenging. Maintaining infrastructure to the highest possible condition while investing the minimal amount of money has promoted innovative contracting approaches. Transportation agencies have increased private sector involvement through long term performance-based maintenance contracts or what is called Performance-Based Contracting. PBC is a type of contract that pays a contractor based on the results achieved, not on the methods for performing the maintenance work. By looking into the literature, it is observed that agencies are expanding the amount of contracting they do in order to maintain and achieve a better standard of infrastructure facilities. Therefore, the objective of this paper is to study and review performance-based contracting for transportation infrastructure with emphasis on bridge assets.

  13. [Psychological contract in the light of flexible employment: The review of studies].

    Science.gov (United States)

    Żołnierczyk-Zreda, Dorota

    Changing employment relations between employees and employers due to the increasing employment flexibility have contributed to the development of a new paradigm to analyze these relations based on the concept of psychological contract. This paradigm might be particularly relevant in Poland where the employment flexibility understood as the number of workers with temporary contracts is the highest in Europe. In this paper the concept of psychological contract is presented along with the existing findings related to its range, balance and contract fulfilment vs. contract breach. The results of studies showing the differences in psychological contract of temporary and permanent workers are also presented. The majority of them indicate that psychological contracts of temporary workers are limited in their extent, less balanced and asymmetric (to workers' disadvantage), as well as more transactional in their nature than those of permanent workers. The temporary workers' well-being and attitudes towards work and their reaction to psychological contract breach largely depends on their preferences for this type of employment, on their qualifications and on a labor market situation. Med Pr 2016;67(4):529-536. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  14. Annual Report 2001; Aarsrapport 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This is the annual report 2001 for the TotalFinaElf oil company. This concern operates in more than 100 countries and covers all aspects of the energy industry, from oil- and gas exploration and production to refining and marketing of refined products and international trade with both unrefined and refined products. Through the Atofina division the concern is also a major player in the chemicals markets. The demonstrated reserves of TotalFinaElf has been calculated to more than ten billion barrels of oil equivalents. At a rate of 2.1 million barrels a day this ensures 14 years of production.

  15. Experiments on supply chain contracting: effects of contract type and fairness concerns

    OpenAIRE

    Arabacı, Özge; Arabaci, Ozge

    2013-01-01

    In this thesis, we conduct experiments with human decision makers on supply chain contracting. We consider a simple manufacturer-retailer supply chain scenario where the retailer faces the newsvendor problem. Building on Sahin and Kaya (2011), we compare the experimental performance of three contract types (wholesale price, buyback and revenue sharing contracts) between the firms with theoretical predictions, and among each other. We are interested in the manufacturer’s contract parameter dec...

  16. 32 CFR 2001.22 - Derivative classification.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Derivative classification. 2001.22 Section 2001.22 National Defense Other Regulations Relating to National Defense INFORMATION SECURITY OVERSIGHT OFFICE, NATIONAL ARCHIVES AND RECORDS ADMINISTRATION CLASSIFIED NATIONAL SECURITY INFORMATION...

  17. 78 FR 47335 - 60-Day Notice of Proposed Information Collection: Public Housing Contracting With Resident-Owned...

    Science.gov (United States)

    2013-08-05

    ... Information Collection: Public Housing Contracting With Resident-Owned Business--Application Requirements... Contracting with Resident- Owned Businesses/Application Requirements. OMB Approval Number: 2577-0161... with State law; Certification that shows the business is owned by residents, disclosure documents that...

  18. 48 CFR 552.238-78 - Scope of Contract (Eligible Ordering Activities).

    Science.gov (United States)

    2010-10-01

    ... containing information technology Special Item Numbers, and Schedule 84 contracts, on an optional basis... Act of 1937), school districts, colleges and other institutions of higher education, council of...

  19. Defense Contract Management: DOD's Lack of Adherence to Key Contracting Principles on Iraq Oil Contract Put Government Interests at Risk

    National Research Council Canada - National Science Library

    Hutton, John P; Ahearn, Marie; Augustine, Penny B; Campbell, Greg; James, Jr., Arthur; Lesonsky, Eric; Lord, Stephen; McDonough-Hughes, Anne; McKelvey, Janet; Patton, Kenneth

    2007-01-01

    .... The contract was also used to ensure adequate fuel supplies inside Iraq. RIO I was a cost-plus-award-fee type contract that provided for payment of the contractor's costs, a fixed fee determined at inception of the contract, and a potential award fee...

  20. National Hospital Discharge Survey: 2001 annual summary with detailed diagnosis and procedure data.

    Science.gov (United States)

    Kozak, Lola Jean; Owings, Maria F; Hall, Margaret J

    2004-06-01

    This report presents 2001 national estimates and selected trend data on the use of non-Federal short-stay hospitals in the United States. Estimates are provided by selected patient and hospital characteristics, diagnoses, and surgical and nonsurgical procedures performed. Admission source and type, collected for the first time in the 2001 National Hospital Discharge Survey, are shown. The estimates are based on data collected through the National Hospital Discharge Survey (NHDS). The survey has been conducted annually since 1965. In 2001, data were collected for approximately 330,000 discharges. Of the 477 eligible non-Federal short-stay hospitals in the sample, 448 (94 percent) responded to the survey. Estimates of diagnoses and procedures are presented according to International Classification of Diseases, 9th Revision, Clinical Modification (ICD-9-CM) code numbers. Rates are computed with 2001 population estimates based on the 2000 census. The appendix includes a comparison of rates computed with 1990 and 2000 census-based population estimates. An estimated 32.7 million inpatients were discharged from non-Federal short-stay hospitals in 2001. They used 159.4 million days of care and had an average length of stay of 4.9 days. Common first-listed discharge diagnoses included delivery, psychoses, pneumonia, malignant neoplasm, and coronary atherosclerosis. Males had higher rates for procedures such as cardiac catheterization and coronary artery bypass graft, and females had higher rates for procedures such as cholecystectomy and total knee replacement. The rates of all cesarean deliveries, primary and repeat, rose from 1995 to 2001; the rate of vaginal birth after cesarean delivery dropped 37 percent during this period.

  1. Rezultate ale implementării programului PHARE 2001 privind politica de dezvoltare regională a Regiunii 7 Centru din România

    Directory of Open Access Journals (Sweden)

    Dorel URSU

    2006-06-01

    Full Text Available This paper tries to critically assess the way in which the 2001 PHARE Program, by means of non-reimbursable grants, managed to contribute to the regional development policy of the Center Region (Romania between 2000-2004. The paper comprises an overview of Romania’s Regional Development Policy and the structures involved in implementing this policy in reference to the Center Region. This brief overview focuses on a description of the region, its goals and its strategy. The paper analyzes the development goals and the strategic priorities set forth by the Regional Development Agency for the Center Region. The aim of this endeavor is to evaluate the accomplishment level of the proposed strategies. The final part of the paper assesses the achievements of the projects contracted by Center Region from 2001 PHARE Program and some recommendations are made to attain the proposed objectives.

  2. Moral Contract Theory and Social Cognition : An Empirical Perspective

    NARCIS (Netherlands)

    Timmerman, Peter

    2014-01-01

    This interdisciplinary work draws on research from psychology and behavioral economics to evaluate the plausibility of moral contract theory. In a compelling manner with implications for moral theory more broadly, the author’s novel approach resolves a number of key contingencies in contractarianism

  3. 78 FR 65697 - 30-Day Notice of Proposed Information Collection: Public Housing, Contracting With Resident-Owned...

    Science.gov (United States)

    2013-11-01

    ... Information Collection: Public Housing, Contracting With Resident-Owned Businesses--Application Requirements..., Contracting with Resident-Owned Businesses-Application Requirements. OMB Approval Number: 2577-0161. Type of... State law; Certification that shows the business is owned by residents, disclosure documents that...

  4. Trends in Canadian Respiratory Clinical Trials from 2001 to 2011

    Directory of Open Access Journals (Sweden)

    Claire Elizabeth Tacon

    2014-01-01

    Full Text Available Clinical research bridges patients’ unmet medical need with innovative medicines, increases knowledge acquisition by clinicians, and creates solutions to improve the sustainability and quality of the Canadian health care system and economy. The Canadian Institutes of Health Research and the Canadian Lung Association have recently raised concerns over declining research activities within the Canadian respiratory community. While there are currently >3000 ongoing clinical trials in Canada, the number of trials investigating common respiratory diseases is unknown. The objective of the present study was to monitor the trends in industry- and non-industry-sponsored respiratory clinical trials in Canada from 2001 to 2011. Trialtrove 2012 (Citeline, an Informa UK business, a database containing summarized clinical trial information regarding pharmaceutical products, was searched using common chronic respiratory disease terms: “allergic rhinitis”, “asthma”, “chronic obstructive pulmonary disease (COPD”, “cystic fibrosis”, “respiratory infections”, “pulmonary fibrosis” and “smoking cessation”. Over the past 10 years, the number of respiratory clinical trials conducted in Canada has increased (4.49 per year; P=0.004. From 2001 to 2011, the majority of trials were performed in asthma, followed closely by respiratory infections and COPD. Over the past decade, the number of trials investigating COPD and respiratory infections increased (P<0.05, while asthma trials showed a declining trend since 2007. Of the clinical trials performed during this 10-year period, the majority were in phase III, with a significant increase in the number of phase II trials (2.49 per year; P=0.008. However, certain trends observed are concerning and warrant further monitoring in the coming years.

  5. Institute of Bioinorganic and Radiopharmaceutical Chemistry. Annual report 2001

    International Nuclear Information System (INIS)

    Johannsen, B.; Seifert, S.

    2002-01-01

    In 2001 the Forschungszentrum Rossendorf e.V. continued and further developed its basic and application-oriented research. Research at the Institute of Bioinorganic and Radiopharmaceutical Chemistry, one of five institutes in the Research Centre, was focused on radiotracers as molecular probes to make the human body biochemically transparent with regard to individual molecular reactions. As illustrated by the large number of contributions in this report, the Institute is predominantly engaged in the coordination chemistry and radiopharmacology of technetium and rhenium. (orig.)

  6. International chart of the nuclides. 2001

    International Nuclear Information System (INIS)

    Golashvili, T.V.; Kupriyanov, V.M.; Lbov, A.A.

    2002-01-01

    The International Chart of Nuclides - 2001 has been developed taking into account the data obtained in 1998-2001. Unlike widespread nuclide charts the present Chart of Nuclides contains EVALUATED values of the main characteristics. These values are supplied with the standard deviations. (author)

  7. Intramuscular fatty acid metabolism in contracting and non-contracting human skeletal muscle

    DEFF Research Database (Denmark)

    Sacchetti, M; Saltin, B; Osada, T

    2002-01-01

    The present study was undertaken to investigate the fate of blood-borne non-esterified fatty acids (NEFA) entering contracting and non-contracting knee extensor muscles of healthy young individuals. [U-(13)C]-palmitate was infused into a forearm vein during 5 h of one-legged knee extensor exercis...... and degraded and that the metabolic fate of plasma NEFA entering the muscle is influenced by muscle contraction, so that a higher proportion is directed towards oxidation at the expense of storage in mTAG.......The present study was undertaken to investigate the fate of blood-borne non-esterified fatty acids (NEFA) entering contracting and non-contracting knee extensor muscles of healthy young individuals. [U-(13)C]-palmitate was infused into a forearm vein during 5 h of one-legged knee extensor exercise.......05) in the contracting muscle, whereas it was unchanged in the non-contracting muscle. The uptake of plasma NEFA, as well as the proportion directed towards oxidation, was higher in the exercising compared to the non-exercising leg, whereas the rate of palmitate incorporation into mTAG was fourfold lower (0.70 +/- 0...

  8. Bunker purchasing with contracts

    DEFF Research Database (Denmark)

    Plum, Christian Edinger Munk; Neergaard Jensen, Peter; Pisinger, David

    2014-01-01

    The cost for bunker fuel represents a major part of the daily running costs of liner shipping vessels. The vessels, sailing on a fixed roundtrip of ports, can lift bunker at these ports, having differing and fluctuating prices. The stock of bunker on a vessel is subject to a number of operational...... optimally to reduce overall costs. The Bunker Purchasing with Contracts Problem has been formulated as a mixed integer programme, which has been Dantzig-Wolfe decomposed. To solve it, a novel column generation algorithm has been developed. The algorithm has been run on a series of real-world instances...

  9. Rheosensing by impulsive cells at intermediate Reynolds numbers

    Science.gov (United States)

    Mathijssen, Arnold; Bhamla, Saad; Prakash, Manu

    2017-11-01

    For aquatic organisms, mechanical signals are often carried by the surrounding liquid, through viscous and inertial forces. Here we consider a unicellular yet millimetric ciliate, Spirostomum ambiguum, as a model organism to study hydrodynamic sensing. This protist typically swims at moderate Reynolds numbers, Re 100 during impulsive contractions where its elongated body recoils within milliseconds. First, using high-speed PIV and an electrophysiology setup, we deliver controlled voltage pulses to induce these rapid contractions and visualise the vortex flows generated thereby. By comparing these measurements with CFD simulations the range of these hydrodynamic ``signals'' is characterized. Second, we probe the mechano-sensing of the organism with externally applied flows and find a critical shear rate necessary to trigger a contraction. The combination of high Re flow generation and rheosensing could facilitate intercellular communication over large distances. Please also see our other talk ``Collective hydrodynamic communication through ultra-fast contractions''.

  10. 48 CFR 937.7040 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 937.7040... CONTRACTING SERVICE CONTRACTING Protective Services Contracting 937.7040 Contract clauses. The contracting... services” in all protective services solicitations and contracts involving DOE-owned facilities requiring...

  11. MEDIATION CLAUSE IN COMMERCIAL CONTRACTS (THE ADVANTAGES OF MEDIATION CLAUSE IN COMMERCIAL CONTRACTS

    Directory of Open Access Journals (Sweden)

    Claudiu Florinel Augustin Ignat

    2013-11-01

    Full Text Available It often happens that the end of the contracts to be existing commercial relationships and a new contract has already intuitu personae character. But not always the case, that those who enter into legal commercial forcing consideration to the benefits and under commercial contracts, know the dealer or individual that established commercial relations. These traders resort to contractual conditions which states precisely the extent of the obligations assumed by each party, setting rules, deadlines, penalties and even ways of interpretation of contracts. Contracting Parties, namely traders aware that the law is the contract parties by special caluze invest ( to settle disputes concerning the interpretation or punishment for failure and even termination obligations tribunalule arbitration courts or the territorial and material .

  12. THE PSYCHOLOGICAL CONTRACT

    Directory of Open Access Journals (Sweden)

    Blanca Giorgiana GRAMA

    2015-04-01

    Full Text Available The psychological contract became known as a research paradigm within corporate research, providing a broad framework which explains the employee-company relations. Despite all this, there are still many debates on the concept and a series of criticism were expressed that led to the necessity of some more rigorous theoretical and empirical analysis. The psychological contract refers to the unwritten, implicit expectations that employees have from the company and vice versa; it is that which defines the things the employee expects from the employer. Consequently, each of the parties involved in the contract may have different perceptions on these commitments and obligations. Thus the psychological contract may be regarded as an exchange relation between the employer and the employee. Breaking the psychological contract affects the performance, the morale, and the motivation of the staff in a negative manner. The information presented in this paper is intended to contribute to the theoretical and methodological development of the concept.

  13. Financial Management: Reopening of Contracts in the Mechanization of Contract Administration Services System

    National Research Council Canada - National Science Library

    Granetto, Paul

    2003-01-01

    .... In anticipation of transitioning to the new contract payment system, the Defense Finance and Accounting Service and the Defense Contract Management Agency were attempting to close out as many contracts as possible...

  14. Practical guide on contract of technology

    International Nuclear Information System (INIS)

    Choi, Chiho

    1991-12-01

    This book gives descriptions of practical guide on contract of technology, which deals with basic of contract like meaning, function term, singing and sealing, contract and stamp tax, common things on contract of research like keeping secret and prevention and treat of dispute, compensation for damages, notice, expiration date of contract and measurement at end of contract, contract of joint research such as meaning and necessity, note at contract, check list at contract, and return of the research product.

  15. Concept of contracting authority

    OpenAIRE

    Kasiliauskaitė, Vitalija

    2016-01-01

    Concept of Contracting Authority Law on Public Procurement the procurement concept implies the conclusion that public procurement be declared only such purchases are carried out by the contracting authority. The contracting authorities can be a subject of state and municipal management institutes, whose assignment authority is determined by a functional approach. Also, contracting authorities may be public and legal entities, but that the public interest and operates non-commercial activities...

  16. Service quality in contracted facilities.

    Science.gov (United States)

    Rabbani, Fauziah; Pradhan, Nousheen Akber; Zaidi, Shehla; Azam, Syed Iqbal; Yousuf, Farheen

    2015-01-01

    The purpose of this paper is to explore the readiness of contracted and non-contracted first-level healthcare facilities in Pakistan to deliver quality maternal and neonatal health (MNH) care. A balanced scorecard (BSC) was used as the assessment framework. Using a cross-sectional study design, two rural health centers (RHCs) contracted out to Aga Khan Health Service, Pakistan were compared with four government managed RHCs. A BSC was designed to assess RHC readiness to deliver good quality MNH care. In total 20 indicators were developed, representing five BSC domains: health facility functionality, service provision, staff capacity, staff and patient satisfaction. Validated data collection tools were used to collect information. Pearson χ2, Fisher's Exact and the Mann-Whitney tests were applied as appropriate to detect significant service quality differences among the two facilities. Contracted facilities were generally found to be better than non-contracted facilities in all five BSC domains. Patients' inclination for facility-based delivery at contracted facilities was, however, significantly higher than non-contracted facilities (80 percent contracted vs 43 percent non-contracted, p=0.006). The study shows that contracting out initiatives have the potential to improve MNH care. This is the first study to compare MNH service delivery quality across contracted and non-contracted facilities using BSC as the assessment framework.

  17. Analyzing Contingency Contracting Purchases for Operation Iraqi Freedom (Unrestricted Version)

    Science.gov (United States)

    2008-01-01

    that could inform such strategic purchasing decisions. 14 We used the unique contract identification number to check for cross -organization...beds, mattresses, dressers , footlockers) Other (stools, rugs, seats, cabinets, tables, folding chairs, paintings) Generators Various power generators

  18. Aerosol modelling and validation during ESCOMPTE 2001

    Science.gov (United States)

    Cousin, F.; Liousse, C.; Cachier, H.; Bessagnet, B.; Guillaume, B.; Rosset, R.

    The ESCOMPTE 2001 programme (Atmospheric Research. 69(3-4) (2004) 241) has resulted in an exhaustive set of dynamical, radiative, gas and aerosol observations (surface and aircraft measurements). A previous paper (Atmospheric Research. (2004) in press) has dealt with dynamics and gas-phase chemistry. The present paper is an extension to aerosol formation, transport and evolution. To account for important loadings of primary and secondary aerosols and their transformation processes in the ESCOMPTE domain, the ORISAM aerosol module (Atmospheric Environment. 35 (2001) 4751) was implemented on-line in the air-quality Meso-NH-C model. Additional developments have been introduced in ORganic and Inorganic Spectral Aerosol Module (ORISAM) to improve the comparison between simulations and experimental surface and aircraft field data. This paper discusses this comparison for a simulation performed during one selected day, 24 June 2001, during the Intensive Observation Period IOP2b. Our work relies on BC and OCp emission inventories specifically developed for ESCOMPTE. This study confirms the need for a fine resolution aerosol inventory with spectral chemical speciation. BC levels are satisfactorily reproduced, thus validating our emission inventory and its processing through Meso-NH-C. However, comparisons for reactive species generally denote an underestimation of concentrations. Organic aerosol levels are rather well simulated though with a trend to underestimation in the afternoon. Inorganic aerosol species are underestimated for several reasons, some of them have been identified. For sulphates, primary emissions were introduced. Improvement was obtained too for modelled nitrate and ammonium levels after introducing heterogeneous chemistry. However, no modelling of terrigeneous particles is probably a major cause for nitrates and ammonium underestimations. Particle numbers and size distributions are well reproduced, but only in the submicrometer range. Our work points out

  19. OFFICIAL HOLIDAYS IN 2001 AND END-OF-YEAR CLOSURE 2001/2002

    CERN Document Server

    Human Resources Division

    2001-01-01

    (Application of Articles R II 4.33 and R II ;4.34 of the Staff Regulations) Official holidays in 2001 (in addition to the end-of-year holidays) : Friday, 13th April (Good Friday) Monday, 16th April (Easter Monday) Tuesday, 1st May Thursday, 24th May (Ascension Day) Monday, 4th June (Whit Monday) Thursday, 6th September (Jeûne genevois) Annual closure of the site of the Organization and day of special leave granted by the Director-General : The Laboratory will be closed from Saturday, 22nd December 2001 to Sunday, 6th January 2002 inclusive (without deduction of annual leave). The first working day in the New Year will be Monday, 7th January 2002.

  20. Industrial Services Contracts

    CERN Document Server

    2006-01-01

    This document gives an overview of Industrial Services contracts at CERN, including the probable expenditure in 2006 and the estimated expenditure for 2007. The Finance Committee is invited: - to take note of the revised amount in 2006 for Industrial Services contracts referred to in this document of 138.02 MCHF at 2006 prices compared to the previously anticipated amount of 122.67 MCHF at 2005 prices; - to take note that the estimated amount in 2007 for the contracts referred to in this document will be 112.54 MCHF at 2006 prices; - for the reasons set out in this document, the Finance Committee is also invited to approve the requests for the contracts presented and highlighted in the Annexes.

  1. Making contracting work better and cost less: Report of the Contract Reform Team

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In June 1993, Secretary of Energy Hazel O`Leary formed a Contract Reform Team, chaired by Deputy Secretary Bill White, to evaluate the contracting practices of the Department of Energy and to formulate specific proposals for improving those practices. This report summarizes the results of the work of the Contract Reform Team. It recommends actions for implementation that will significantly improve the Department`s contracting practices and will enable the Department to help create a government that -- in the words of Vice President Gore -- {open_quotes}works better and costs less.{close_quotes} These actions and the deadlines for their implementation are listed. Among other things, they recommend replacing the Department`s standard Management and Operating Contract with a new Performance-Based Management Contract and strengthening the Department`s systems for selecting and managing contractors.

  2. Contract Renewal Information - all Contracts

    Data.gov (United States)

    Department of Housing and Urban Development — Multifamily Portfolio datasets (section 8 contracts) - The information has been compiled from multiple data sources within FHA or its contractors. HUD oversees more...

  3. A review of fast reactor program in Japan (April 2001 - March 2002)

    International Nuclear Information System (INIS)

    Nagata, T.; Ieda, Y.

    2002-01-01

    This report describes the research and development activities on fast reactors in Japan thru April 2001 to March 2002. In December 2001, the Cabinet decided the Plan for Reorganization of Government-funded Corporations including the merger of JNC and the Japan Atomic Energy Research Institute (JAERI). A law to set up a new entity is supposed to be submitted to the National Diet by the Japanese Fiscal Year (JFY) 2004. In the Experimental Fast Reactor Joyo, thirty-five duty cycle operations and thirteen special tests with the MK-II core were completed by June 2000 without any fuel pin failures or serious plant trouble. The reactor is currently being upgraded to the MK-III core. Though a fire broke out in the maintenance building of Joyo in October 2001, the Mk-III construction work was restarted in February 2002. In the Prototype Fast Breeder Reactor Monju, countermeasures against sodium leakage have already been drawn up based on Monju comprehensive safety review. The safety licensing examination for the plant modification of Monju is undergoing. As for the Feasibility Study on Commercialized Fast Reactor Cycle Systems, JFY2001 was the first year of its second phase. A three-year period from JFY2001 to 2003 is the initial term of this phase. During this term, research activities are being focused on the design of the candidate concepts and fundamental tests of key technologies. An interim summary of these activities will be checked and reviewed, and based on the results; the research for JFY 2004 to 2005 will be conducted in order to narrow down the number of alternatives for the fast reactor cycle. (author)

  4. Employee contract issues for dermatologists.

    Science.gov (United States)

    Brown, Christopher E; Indest, George F

    2013-12-01

    Employees and employers routinely face negotiating and preparing physician employment contracts. It is important for both sides to know and understand the basic information on what a comprehensive employment contract for a dermatologist should contain. There are various employment contract provisions from both the employee's perspective and the employer's perspective that must be considered when preparing physician employment contracts. This article provides basic advice and recommendations on requirements that should be included in such contracts. It suggests legal pitfalls that can be avoided through various contract clauses.

  5. Tucannon River Spring Chinook Salmon Captive Broodstock Program, Annual Report 2001.

    Energy Technology Data Exchange (ETDEWEB)

    Gallinat, Michael P.; Bumgarner, Joseph D.

    2002-05-01

    This report summarizes the objectives, tasks, and accomplishments of the Tucannon River spring chinook captive brood during 2001. The WDFW initiated a captive broodstock program in 1997. The overall goal of the Tucannon River captive broodstock program is for the short-term, and eventually long-term, rebuilding of the Tucannon River spring chinook salmon run, with the hope that natural production will sustain itself. The project goal is to rear captive salmon selected from the supplementation program to adults, spawn them, rear their progeny, and release approximately 150,000 smolts annually into the Tucannon River between 2003-2007. These smolt releases, in combination with the current hatchery supplementation program (132,000 smolts) and wild production, are expected to produce 600-700 returning adult spring chinook to the Tucannon River each year from 2005-2010. The captive broodstock program will collect fish from five (1997-2001) brood years (BY). The captive broodstock program was initiated with 1997 BY juveniles, and the 2001 BY fish have been selected. As of Jan 1, 2002, WDFW has 17 BY 1997, 159 BY 1998, 316 BY 1999, 448 BY 2000, and approximately 1,200 BY 2001 fish on hand at LFH. The 2001 eggtake from the 1997 brood year (Age 4) was 233,894 eggs from 125 ripe females. Egg survival was 69%. Mean fecundity based on the 105 fully spawned females was 1,990 eggs/female. The 2001 eggtake from the 1998 brood year (Age 3) was 47,409 eggs from 41 ripe females. Egg survival was 81%. Mean fecundity based on the 39 fully spawned females was 1,160 eggs/female. The total 2001 eggtake from the captive brood program was 281,303 eggs. As of May 1, 2002 we have 171,495 BY 2001 captive brood progeny on hand. A total of 20,592 excess fish were marked as parr (AD/CWT) and will be released during early May, 2002 into the Tucannon River (rkm 40-45). This will allow us to stay within our maximum allowed number (150,000) of smolts released. During April 2002, WDFW volitionally

  6. Bonneville Purchasing Instructions. Appendix 14A, Contracting Officer`s Technical Representatives` Guide for Services Contracts.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-07-01

    This guide outlines the duties of BPA personnel designated as Contracting Officers Technical Representatives (COTRs). The BPA Administrator gives contracting officers (COs) in BPA responsibility and authority for awarding and administering contracts. COs are authorized to designate other BPA employees to act as their representatives for purposes of contract administration, from the time of contract award until final receipt and acceptance of the contracted services. COTRs are the individuals primarily relied upon to perform technical contract administration functions. Similar functions for supply and construction contracts are performed by engineering representatives, construction inspectors, and inspectors. Although this Guide is written primarily with the COTR in mind, the concept and operation of teamwork is essential throughout the entire process of contract administration. The CO administers the contract during performance, but rarely has expertise in all of the relevant technical areas. Therefore, CO decisions rely on input from a team. The COTR is an indispensable member of that team. The instructions in this Guide are designed to facilitate this essential CO-COTR cooperation. COTR duties are usually additional to those required of the COTR in his or her assigned line organization. The COTR is still accountable to the line supervisor for performance of regularly-assigned duties. These duties are to be reflected appropriately in performance appraisals and job descriptions. For contract administration duties, however, the COTR reports directly to, and is accountable only to, the CO. The COTR`s supervisor must allow sufficient time to ensure that the COTR can adequately monitor the contract for technical compliance. This Guide is designed for COTRs who are performing service contract (including intergovernmental contract) administration functions as an adjunct to their normal technical duties.

  7. Climate Assessment For 2001

    Science.gov (United States)

    Waple, A. M.; Lawrimore, J. H.; Lyon, B.; Halpert, M. S.; Gleason, K. L.; Menne, M. J.; Schnell, R. C.; Thiaw, W.; Wright, W. J.; Alexander, L.; Salinger, M. J.; Bell, G. D.; Higgins, R. W.; Stone, R. S.

    2002-05-01

    It is the twelfth year that the Climate Assessment has been written to summarize the state of the Earth's climate, and the second year that the National Climatic Data Center has taken the lead in its production. It is a cooperative effort that includes contributions from scientists around the country and the world. The long-running La Nina episode finally came to an end in 2001. The weak La Nina, which began in mid-1998 persisted through the first half of the year but gave way to neutral ENSO conditions for the latter half. Global temperatures in 2001 were 0.51C (0.92F) above the long-term (1880-2000) average, which places 2001 as the second warmest year on record. Land temperatures were 0.75C (1.35F) above average and ocean temperatures were 0.40C (0.72F) above the 1880-2000 mean. This ranks them as 2nd and 3rd warmest on record respectively. The Northern Hemisphere temperature continues to average near record levels in 2001 at 0.60C (1.08F) above the long-term average. The Southern Hemisphere also reflects the globally warmer conditions, with a positive anomaly of 0.43C (0.77F). Annual anomalies in excess of 1.0C (1.8F) were widespread across North America and much of Europe and the Middle East, while significantly cooler than average conditions were confined to Western Australia the Northeast and Northwest Pacific Ocean, and the far southeastern region of the Pacific, near coastal Chile. Although no hurricanes made landfall in the United States for the second consecutive year, it was nonetheless an extremely active Atlantic hurricane season, the fourth most active on record. Tropical Storm Allison became the costliest tropical storm on record when it caused around five billion US dollars worth of damage in southern and southeastern USA. The season was slow to start but quickly escalated in the last three months of the season and it was the first time in recorded history that three hurricanes have formed in the Atlantic in the month of November. Other notable

  8. Surveillance of tularaemia in Kosovo, 2001 to 2010.

    Science.gov (United States)

    Grunow, R; Kalaveshi, A; Kühn, A; Mulliqi-Osmani, G; Ramadani, N

    2012-07-12

    Tularaemia, caused by Francisella tularensis, had not been registered in Kosovo before an outbreak in 1999 and 2000. A national surveillance system has been implemented in Kosovo since 2000 to monitor a number of diseases, including tularaemia. Antibody detection in human sera was used for laboratory diagnosis of tularaemia and F. tularensis lipopolysaccharide antigen was used as a marker of infection. The purpose of this study is to describe the incidence of tularaemia in Kosovo after the 1999-00 outbreak. In 2001 and 2002, a second outbreak occurred, with 327 serologically confirmed cases. From 2001 to 2010, 25-327 cases were registered per year, giving a mean annual incidence of 5.2 per 100,000 population. The most likely sources of infection were contaminated drinking water and food. The dominant clinical manifestations were the glandular (79%) and ulcero-glandular (21%) forms. By 2010, the disease had spread throughout Kosovo. Presumably as a result of war and subsequent environmental disruption, mass population displacement and breakdown of sanitation and hygiene, the two major outbreaks of tularaemia resulted in the establishment of an active endemic area of tularaemia in Kosovo.

  9. Other enrichment related contracts

    International Nuclear Information System (INIS)

    Hall, J.C.

    1978-01-01

    In addition to long-term enrichment contracts, DOE has other types of contracts: (1) short-term, fixed-commitment enrichment contract; (2) emergency sales agreement for enriched uranium; (3) feed material lease agreement; (4) enriched uranium storage agreement; and (5) feed material usage agreement

  10. Proposal for the award of a contract, without competitive tendering, for the supply of electricity

    CERN Document Server

    2000-01-01

    This document concerns the award of a contract, without competitive tendering, for the supply of electricity for the period from January 2001 until 30 June 2003. On 13 January 2000 a market survey was sent to 43 firms in sixteen Member States. Following this market survey, CERN received an unsolicited offer from EDF/EOS. With a view to verifying the competitiveness of the offer, three firms and one consortium in four Member States, qualified from the market survey, were requested to submit quotations. CERN received three quotations from two firms and the consortium which indeed confirmed that the offer from EDF/EOS was very competitive. The Finance Committee is invited to agree to the negotiation of a contract with the consortium EDF (FR)/EOS (CH), which submitted the unsolicited offer, for the supply of electricity until June 2003 for a total estimated amount, based on the present schedules of the accelerators for the associated period, of 290 000 000 French francs, not subject to revision. At the present ra...

  11. Expert assessment of advanced power sources. Contract report

    International Nuclear Information System (INIS)

    Gardner, C.L.

    2007-07-01

    Although DRDC published an exhaustive technical report (in August 2001) on technology trends in advanced power sources projected out to the year 2020, the terrorist attacks on the US on September 11, 2001 (and the consequent, augmented and more broadly-based defence and national security posture adopted by the CF/DND), together with rapid developments in power source technologies over the past five years, internationally, prompted DRDC to update the 2001 report, on a selected number of power source technologies or applications and to provide further guidance to DRDC's Advanced Power Source R and D program. Eight wide-ranging, power source technologies or applications were investigated, using the technique of 'expert elicitation' (that is, using independent experts in the various and diverse technological fields), based on a standardized questionnaire, augmented by the contractor's own expertise (and his overall analysis of the experts' responses) in these diverse areas. In addition, each expert was asked about his/her view on the likely role of nanotechnology in each technological area or application. Following collection and analysis of all the data, the contractor made recommendations on the ability of each power source to meet the future requirements of the CF/DND, taking into account the Technology Readiness Level, for each technology or application

  12. La mortalidad por suicidios: México 1990-2001 Mortality from suicides: Mexico, 1990-2001

    Directory of Open Access Journals (Sweden)

    Esteban Puentes-Rosas

    2004-08-01

    Full Text Available OBJETIVO: Describir la mortalidad por suicidios en México en 2001, así como los principales cambios en los métodos de suicidio y en la estructura por edades y sexos que se han presentado desde 1990, tanto a escala nacional como por entidad federativa. MÉTODOS: Para este estudio descriptivo se utilizaron como fuentes de informaci��n los registros oficiales de mortalidad del Instituto Nacional de Estadística, Geografía e Informática para el período de 1990 a 2001. Para calcular las tasas de mortalidad se usaron las poblaciones estimadas por el Consejo Nacional de Población en 2002. Se describieron la mortalidad por sexo, por grupo de edad y por entidad federativa, así como los cambios observados en el período de 1990­ 2001 en las tasas y los métodos de suicidio. Para estandarizar las tasas se empleó el método directo, y como estándar se tomaron los datos de población del año 2000. Las comparaciones estadísticas de las tendencias según el grupo de edad y el sexo se llevaron a cabo mediante una prueba de paralelismo utilizando el estadígrafo F. El nivel de significación estadística de las diferencias en los métodos de suicidio se determinó mediante la prueba de ji al cuadrado. RESULTADOS: Durante el año 2001 se registraron 3 784 suicidios (3 110 de ellos en hombres y 674 en mujeres, lo que representa una tasa de 3,72 muertes por suicidios por cada 100 000 habitantes, en una población total nacional de 101,8 millones de habitantes. Los estados con mayor mortalidad por suicidios fueron Campeche y Tabasco (9,68 y 8,47 por 100 000 habitantes, respectivamente. Las menores tasas se observaron en Chiapas y el Estado de México (1,03 y 1,99 por 100 000 habitantes, respectivamente. En 2001, la mortalidad por suicidios por 100 000 habitantes fue de 6,14 en hombres y de 1,32 en mujeres. El mayor incremento por grupo de edad se observó en las mujeres de 11­19 años (de 0,8 en 1990 a 2,27 por 100 000 personas en 2001. En los

  13. Steam Digest 2001: Office of Industrial Technologies

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2002-01-01

    Steam Digest 2001 chronicles Best Practices Program's contributions to the industrial trade press for 2001, and presents articles that cover technical, financial and managerial aspects of steam optimization.

  14. Center for Geometrical Metrology Annual Report 2000-2001

    DEFF Research Database (Denmark)

    De Chiffre, Leonardo; Bariani, Paolo

    The objective of this Annual Report is to give a general introduction to CGM as well as to give an account of the tasks carried out using the facilities of CGM’s Instrument Centre during 2000 and 2001. A considerable number of people have contributed to the establishment of the Centre and who...... are involved in it's daily operation. In particular, I would like to thank my colleagues here at the Department of Manufacturing Engineering and Management (IPL) at the Technical University of Denmark (DTU) and at the Institute for Product Development (IPU), as well as those external consultants who during...

  15. LULI 2001 activity report; LULI rapport annuel 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This document gathers the main results obtained by scientists from the LULI (laboratory for the use of intense lasers) unit in 2001. It is made up of 39 short articles and is organized into 6 topics: 1) laser-matter interaction, 2) hydrodynamics, shocks, equations of state, 3) atom physics, X-ray lasers, 4) material treatment, 5) progress in optics for power lasers, and 6) instrumentation.

  16. 48 CFR 1316.406 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1316.406 Section 1316.406 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 1316.406 Contract clauses. Insert a clause...

  17. 48 CFR 716.406 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 716.406 Section 716.406 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost Reimbursement Contracts 716.406 Contract clauses. The...

  18. 48 CFR 916.307 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 916.307 Section 916.307 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 916.307 Contract clauses. (g) Insert the...

  19. 48 CFR 935.071 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 935.071... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 935.071 Contract clause. The contracting officer must insert the clause at 952.235-71, Research Misconduct, in contracts, including management and operating...

  20. Proposal for the award of an industrial services contract for electrical installation work and maintenance of lighting and low-voltage distribution

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Services contract for electrical installation work and maintenance of lighting and low-voltage distribution. Following a market survey carried out among 127 firms in fifteen Member States, a call for tenders (IT-2754/ST) was sent on 2 June 2000 to three firms and four consortia, each consisting of two firms, in four Member States. By the closing date, CERN had received tenders from two firms and two consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium SPIE TRINDEL(FR) ? CONTROLMATIC (DE), the lowest bidder complying with the specified requirements, for an initial period of three years from 1 July 2001 for a total amount of 41 705 497 Swiss francs, not subject to revision until 31 December 2003. The contract will include options for two one-year extensions beyond the initial three-year period for a total amount of 27 803 664 Swiss francs, for which CERN will seek approval by the Finance ...

  1. Essays on incomplete contracts in regulatory activities

    Science.gov (United States)

    Saavedra, Eduardo Humberto

    that a large number of legal disputes are inhibited by the nonexistence of institutions able to verify and enforce contracts. An in-depth analysis of six cases of open conflict provides support for such a presumption and highlights the crucial role of an adequate market design.

  2. 3 CFR - Government Contracting

    Science.gov (United States)

    2010-01-01

    ... contract oversight could reduce such sums significantly. Government outsourcing for services also raises... a risk that taxpayer funds will be spent on contracts that are wasteful, inefficient, subject to... mission. In such cases, the agency must ensure that the risks associated with noncompetitive contracts are...

  3. Work and minor work contracts

    CERN Document Server

    1999-01-01

    The Work and Minor Work contracts are all of the result-oriented type. The work is specified by CERN and the contractor is given full responsibility for its performance. The contracts are thus very similar to supply contracts. The re-tendering of the existing contracts is almost complete, except for some building maintenance contracts. A new cycle of re-tendering for some activities will be launched in the next twelve months. The total estimated expenditure in the year 2000 for the contracts referred to in this document is 27 750 000 Swiss francs at 1999 prices. The Finance Committee is invited: - to approve the proposed expenditure for the extension of contracts for which the estimated amount for the year 2000 exceeds 750 000 Swiss francs, namely those under references 1, 2, 3, 5, 7, 8, 9 and 23, highlighted in Table I; - to take note that all Work and Minor Work contracts have been tendered since 1 January 1994, except the small contracts shown under references 12 and 16 in Table I; - to take note that the ...

  4. Networks and informal contract law

    NARCIS (Netherlands)

    Tjong Tjin Tai, Eric; Brownsword, Roger; van Gestel, Rob A.J.; Micklitz, Hans-W.

    2017-01-01

    It is often argued that formal contract law cannot treat networks correctly. An analysis of networks in an informal contract law system shows that informal contract law is no panacea. Remaining problems require a different approach to legal regulation and contract practice.

  5. Characteristics of nuclear contracts. Pt. 1

    International Nuclear Information System (INIS)

    Blanchard, R.

    1976-01-01

    While the object of nuclear contracts is specific, these contracts are concluded according to proven techniques based on general regulations on contracts. Following a review of contract classification, they are differentiated according to the nature of the co-contracting parties, the purpose of the contract itself, the procedure for drawing up the contracts, and payment. The operations prior to the contract vary in that they may include a call for tenders, an option for delays or a letter of intent. (NEA) [fr

  6. An Analysis of Army Contract Administration With Regard to Contracting Officers Representatives

    Science.gov (United States)

    2016-09-01

    TO CONTRACTING OFFICER’S REPRESENTATIVES September 2016 By: Tanya V. Peel Angel R. Acevedo Advisors : Karen Landale Matthew Kremer...among contracting personnel and CORs requires improvement, staff levels need to be increased to support contract administration, managers nominate CORs...Landale, Lead Advisor Matthew Kremer, Support Advisor Brad Naegle Academic Associate Graduate School of Business and Public

  7. Financial profile of Hydro-Quebec : 1998-2001

    International Nuclear Information System (INIS)

    1999-01-01

    Hydro-Quebec is a publicly owned company with a single shareholder, the Quebec government. It is ranked among North America's largest distributors of green energy. This report provides financial highlights including revenue, expenditure, net income, total assets, long term debt, shareholder's equity and the financial position of the utility. Operating statistics are also provided. This includes electricity sold both in and out of Quebec, total installed capacity, peak requirements for winter, total number of customer accounts, and the number of permanent employees. Because of the January ice storm, Hydro-Quebec's major priority in 1998 was to reinforce its transmission and distribution system to meet customer expectations. From February to December 1998, about 3,000 km of line were built, rebuilt or consolidated. By 2001, the utility will have looped several of its high-voltage transmission systems. Plans are also underway to build four new high-voltage lines and an interconnection with Ontario, using advanced technologies. tabs., figs

  8. Influenza AH1N2 Viruses, United Kingdom, 2001?02 Influenza Season

    OpenAIRE

    Ellis, Joanna S.; Alvarez-Aguero, Adriana; Gregory, Vicky; Lin, Yi Pu; Hay, A.; Zambon, Maria C.

    2003-01-01

    During the winter of 2001?02, influenza AH1N2 viruses were detected for the first time in humans in the U.K. The H1N2 viruses co-circulated with H3N2 viruses and a very small number of H1N1 viruses and were isolated in the community and hospitalized patients, predominantly from children

  9. Incidence of rheumatoid arthritis from 1995 to 2001

    DEFF Research Database (Denmark)

    Pedersen, Jens; Kjær, Niels; Svendsen, Anders

    2009-01-01

    The aim of this study was to describe the mean incidence rate of rheumatoid arthritis over a 7-year period from 1995 to 2001 in a population in the southern part of Denmark, using the data from several sources. Cases fulfilling the 1987 American College of Rheumatology criteria for rheumatoid...... from general practice and referral centres, the estimated incidence was 35/100,000 person-years (95% confidence interval 32-38). We suggest that the estimated rate should be viewed as a plausible upper limit for the incidence of rheumatoid arthritis in the southern part of Denmark....... arthritis were identified at hospitals and private practising rheumatologists (referral centres), and in general practice. The observed incidence was 32/100,000 person-years (95% confidence interval 29-35). Using the ratio between the number of cases known only from general practice and the number known...

  10. Adding Concurrency to Smart Contracts

    OpenAIRE

    Dickerson, Thomas; Gazzillo, Paul; Herlihy, Maurice; Koskinen, Eric

    2017-01-01

    Modern cryptocurrency systems, such as Ethereum, permit complex financial transactions through scripts called smart contracts. These smart contracts are executed many, many times, always without real concurrency. First, all smart contracts are serially executed by miners before appending them to the blockchain. Later, those contracts are serially re-executed by validators to verify that the smart contracts were executed correctly by miners. Serial execution limits system throughput and fails ...

  11. 48 CFR 732.111 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 732.111... CONTRACTING REQUIREMENTS CONTRACT FINANCING General 732.111 Contract clauses. (a) [Reserved] (b) USAID may... Agency-specific indefinite quantity contracts that are a combination of contract types. Rather than using...

  12. ENFORCEMENT OF MORTGAGE CONTRACT

    Directory of Open Access Journals (Sweden)

    Alisa A. BELU

    2016-07-01

    Full Text Available A chattel mortgage contract is the expression of a real guarantee that gives the creditor precedence over other creditors, in addition to the general pledge upon the belongings of the debtor. It refers to the sale of mortgaged movable assets, exclusively or prioritized in favor of the mortgaging creditor, in case the debtor does not comply with his / her commitments, under the signed mortgage contract. Beginning from this purpose, shared by both sides (as the chattel mortgage contract is synallagmatic, in case the debtor is unable to fulfill his / her commitments, the sides reach a situation of enforcement of the signed chattel mortgage contract. Given the legal status of the chattel mortgage contract [Art. 2387-2477 Noul Cod Civil , Universul Juridic, Bucureşti, 2016, ISBN 978-606-673-792-0], the principle of binding force of the contract and the principle according to which signed legal conventions will entail legal effects, the Romanian law maker developed the proper legal framework for the enforcement of the chattel mortgage contract. [art. 622 si urm. Noul Cod de Procedură Civilă, ed. Hamangiu, Bucureşti, 2016, ISBN 978-606-27-0459-9].

  13. Smart contracts sobre Bitcoin

    OpenAIRE

    Andreu Alemany, Josep Miquel

    2016-01-01

    El present treball final de màster realitza una introducció als smart contracts. El treball introdueix el concepte de contracte intel·ligent, els seus usos i alguns exemples existents. Seguidament proporciona les nocions necessàries de les transaccions del protocol Bitcoin per poder implementar un contracte intel·ligent, usant la blockchain que ofereix el protocol. Per últim, s'explica la implementació d'un contracte intel·ligent usant bitcoin: un canal de micropagaments. El presente traba...

  14. Proposal for the award of a contract without competitive tendering for the supply of coaxial high-voltage cable for the LHC beam dumping system

    CERN Document Server

    2002-01-01

    This document concerns the award of a contract without competitive tendering for the supply of two types of coaxial high-voltage cable for the LHC beam dumping system. Following a market survey carried out among 14 firms in four Member States, a call for tenders (IT-2969/SL/LHC) was sent on 10 July 2001 to one firm. By the closing date, CERN had received one tender. The Finance Committee is invited to agree to the negotiation of a contract with DRAKA MULTIMEDIA CABLE (DE), the only bidder, for the supply of 14 km of coaxial high-voltage cable for the LHC beam dumping system for a total amount of 530 488 euros (779 900 Swiss francs), not subject to revision. The rate of exchange which has been used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: DE - 100%.

  15. Safety and health education and training of contract workers in nuclear power plants

    International Nuclear Information System (INIS)

    Matsumoto, Akikuni; Hara, Hisayuki; Nawata, Kazumitsu

    2008-01-01

    Nuclear power plants have used many contract workers. Their safety and health conditions are very important in Japan. Several amendments, which deregulate temporary personnel service and employment agency markets, have been done in recent years. The number of contract and temporary help agency workers have been rapidly increasing especially since the 1990s. As a result, ensuring the level of safety and health education and training of workers becomes a serious problem. This paper examines the possibility that the level of safety training of the contract workers is less than that of the direct-hire employees in nuclear power plants. We show that (1) the use of contract workers could be less efficient for ensuring the level of safety training, and (2) nuclear power plants still use contract workers in some situations in spite of the loss of efficiency. We also study legislations and past cases relating to nuclear power generation. We find that there are some structural problems that might make the contract workers less trained. (author)

  16. Right to property, inheritance, and contract and persons with mental illness.

    Science.gov (United States)

    Bhugra, Dinesh; Pathare, Soumitra; Joshi, Rajlaxmi; Nardodkar, Renuka; Torales, Julio; Tolentino, Edgardo Juan L; Dantas, Rubens; Ventriglio, Antonio

    2016-08-01

    Discrimination against people with mental illness is rife across the globe. Among different types of discrimination is the policy in many countries where persons with mental illness are forbidden to inherit property, and they are not able to enter into a contract in a large number of countries. Using various databases, legislations dealing with law of contract, law of succession/inheritance, and law relating to testamentary capacity (wills) of all UN Member states (193 countries) were studied. With respect to federal countries, the laws of the most populous state as a representative state in the respective country were studied. Only 40 Member States (21%) recognize/allow persons with mental health problems to enter into contracts. Of these, however, only 16 Member States (9%) recognize the right of persons with mental health problems to enter into a contract without any restrictions. The remaining 24 Member States (12%) allow a contract entered into by a person with mental health problems to be invalidated under certain conditions. These countries also make the validity of the contract subject to the capacity to consent or based on the level of understanding of the person with mental health problems. They may allow persons with mental health problems to enter into contracts only for transactions of an insignificant nature or of personal rights. Only 9% of the countries allow people with mental illness to enter into contracts in an unrestricted way. Furthermore, there remain variations between high income and low income states. In spite of international laws in many countries, laws remain discriminatory.

  17. Designation of Contracting Officers Representatives and Oversight Framework Could Be Improved for Contracts in Afghanistan

    Science.gov (United States)

    2016-08-30

    Sea Systems issue guidance to contracting officers to obtain a quality assurance surveillance plan for all service contracts, and ensure that the...prepare a quality assurance surveillance plan (QASP) for service contracts in order to facilitate assessment of contractor performance.12 Furthermore...that the contracting activities received and paid for goods or services that did not meet contract performance standards. At the time of the audit

  18. 2001 OE 84

    Czech Academy of Sciences Publication Activity Database

    Pravec, Petr; Kušnirák, Peter

    č. 7735 (2001), s. 1 ISSN 0081-0304 R&D Projects: GA ČR GA205/99/0255 Institutional research plan: CEZ:AV0Z1003909 Keywords : asteroids * monoliths * photometry Subject RIV: BN - Astronomy, Celestial Mechanics, Astrophysics

  19. Residential energy contracts and the 28 day rule

    International Nuclear Information System (INIS)

    Littlechild, Stephen

    2006-01-01

    What measures are needed to protect customers when a utility market is first opened to competition? In the UK, residential (domestic) customers must be able to terminate energy contracts at 28 days' notice. This rule was introduced as a transitional protection for customers and for competition. However, the regulatory justification for the rule seems to have evolved over time. Removing the rule could have a number of advantages, including the development of fixed-price fixed-term contracts. The advantages of retaining the rule are questionable. In other retail sectors there is no regulatory concern or requirement of this kind. UK electricity suppliers have begun to offer capped prices for specified periods of time, suggesting that there is a growing customer demand for this. Fixed-price fixed-term contracts are a common form of competition in Scandinavia. The 28 day rule no longer seems necessary to protect customers and is more likely to distort than to protect competition. In retrospect, it would have been preferable not to introduce the rule in the first place. (author)

  20. Explaining the contract terms of energy performance contracting in China: The importance of effective financing

    International Nuclear Information System (INIS)

    Li, Yan; Qiu, Yueming; Wang, Yi David

    2014-01-01

    Energy service company (“ESCO”) uses Energy Performance Contracting (“EPC”) to provide energy-saving services to its clients. Under an EPC, both ESCO and the client invest in the energy efficiency measures, according to a negotiated share of investment. Within the length of the contract, the ESCO and its client divide up the saved energy bill according to a negotiated share. Once the contract expires, the client claims all of the saved energy bills if the energy efficiency measures still last. Different EPC projects have different contract terms, including total investment, share of investment and length of contract. These contract terms directly determine the resulted energy savings. Thus it is essential and important to look at how these contract terms are formed and what are the major influencing factors. This paper first builds a theoretical bargain model between ESCO and its client to find out the structural relationship among these contract terms. Then, using the information of about 140 EPC contracts in China in 2010 and 2011, the paper empirically estimates the impacts of various factors on the contract terms and the resulted energy savings. We find that cost of capitals for ESCOs and the clients, especially for ESCOs, is a major factor influencing contract terms and the resulted energy savings. Thus providing effective financing is critical for the development of EPC in China. - Highlights: • We build a theoretical bargain model between an ESCO and its client. • We empirically quantify the impacts of various factors on EPC contract terms. • Cost of capital is a key factor determining EPC contract terms. • Providing effective financing, especially for ESCOs is important

  1. Extending Security-by-Contract with Quantitative Trust on Mobile Devices

    DEFF Research Database (Denmark)

    Costa, Gabriele; Dragoni, Nicola; Lazouski, Aliaksandr

    2010-01-01

    program our architecture updates the trust level associated with the contract provider. We also present a possible application of our framework in the scenario of a mobile application marketplace, e.g., Apple AppStore, Cydia, Android Market, that, nowadays, are considered as one of the most attractive e......Security-by-Contract (S×C) is a paradigm providing security assurances for mobile applications. In this work, we present the an extension of S×C, called Security-by-Contract-with-Trust (S×C×T). Indeed, we enrich the S×C architecture by integrating a trust model and adding new modules......-commerce activity for both mobile application developers and industries of mobile devices. Since the number of applications increases, Mobile Applications Marketplace (MAMp) sets up recommendation systems that rank and highlight mobile applications by category, social activity, etc. The S×C×T framework we propose...

  2. Simulation of a chain of collapsible contracting lymphangions with progressive valve closure.

    Science.gov (United States)

    Bertram, C D; Macaskill, C; Moore, J E

    2011-01-01

    The aim of this investigation was to achieve the first step toward a comprehensive model of the lymphatic system. A numerical model has been constructed of a lymphatic vessel, consisting of a short series chain of contractile segments (lymphangions) and of intersegmental valves. The changing diameter of a segment governs the difference between the flows through inlet and outlet valves and is itself governed by a balance between transmural pressure and passive and active wall properties. The compliance of segments is maximal at intermediate diameters and decreases when the segments are subject to greatly positive or negative transmural pressure. Fluid flow is the result of time-varying active contraction causing diameter to reduce and is limited by segmental viscous and valvular resistance. The valves effect a smooth transition from low forward-flow resistance to high backflow resistance. Contraction occurs sequentially in successive lymphangions in the forward-flow direction. The behavior of chains of one to five lymphangions was investigated by means of pump function curves, with variation of valve opening parameters, maximum contractility, lymphangion size gradation, number of lymphangions, and phase delay between adjacent lymphangion contractions. The model was reasonably robust numerically, with mean flow-rate generally reducing as adverse pressure was increased. Sequential contraction was found to be much more efficient than synchronized contraction. At the highest adverse pressures, pumping failed by one of two mechanisms, depending on parameter settings: either mean leakback flow exceeded forward pumping or contraction failed to open the lymphangion outlet valve. Maximum pressure and maximum flow-rate were both sensitive to the contractile state; maximum pressure was also determined by the number of lymphangions in series. Maximum flow-rate was highly sensitive to the transmural pressure experienced by the most upstream lymphangions, suggesting that many

  3. Procurement Fraud: A Knowledge-Level Analysis of Contracting Personnel

    Science.gov (United States)

    2014-12-01

    goods and services for cheaper or substandard merchandise that does not conform to contract specifications. This process is also known as product...11 shows a visual depiction of these results. 48 Figure II . Number of Prut icipants by W aiTant Status C. ANALYSIS OF KNOWLEDGE QUESTIONS There

  4. Automatic Conflict Detection on Contracts

    Science.gov (United States)

    Fenech, Stephen; Pace, Gordon J.; Schneider, Gerardo

    Many software applications are based on collaborating, yet competing, agents or virtual organisations exchanging services. Contracts, expressing obligations, permissions and prohibitions of the different actors, can be used to protect the interests of the organisations engaged in such service exchange. However, the potentially dynamic composition of services with different contracts, and the combination of service contracts with local contracts can give rise to unexpected conflicts, exposing the need for automatic techniques for contract analysis. In this paper we look at automatic analysis techniques for contracts written in the contract language mathcal{CL}. We present a trace semantics of mathcal{CL} suitable for conflict analysis, and a decision procedure for detecting conflicts (together with its proof of soundness, completeness and termination). We also discuss its implementation and look into the applications of the contract analysis approach we present. These techniques are applied to a small case study of an airline check-in desk.

  5. Contracting for Public Services

    DEFF Research Database (Denmark)

    Greve, Carsten

    strategic purchasing understanding markets communicating the contracting decision designing and drafting the contract the role of the consumer the regulation of service provision Illustrated throughout with practitioner case-studies from a range of OECD countries, this book presents an important new......Insightful and comprehensive and covering new subjects like globalization and IT, this text, international in its approach, provides a thorough introduction to the key phases of the contracting process and the skills required by managers in its implementation. These include: policy for contracting...

  6. The industrial energy consumption in 2001

    International Nuclear Information System (INIS)

    Anon.

    2002-01-01

    The Danish industrial energy consumption in 2001 is presented in tables. The tables include: the development in the energy consumption, the amount of employees in each of the main branches, fuel consumption, the fuel and energy consumption in 2001 based on each group of branches and energy category, and the emission of CO 2 . (LN)

  7. Decreasing Skin Graft Contraction through Topical Wound Bed Preparation with Anti-Inflammatory Agents

    Science.gov (United States)

    2017-10-01

    Award Number: W81XWH-14-2-0153 TITLE: Decreasing Skin Graft Contraction through Topical Wound Bed Preparation with Anti-Inflammatory Agents...09/14/2017 4. TITLE AND SUBTITLE “Decreasing Skin Graft Contraction through Topical Wound Bed Preparation with Anti-Inflammatory Agents” 5a...of a specific topical anti-inflammatory drug that will reduce and shorten the inflammatory state of the recipient wound bed and thus, skin graft

  8. Year 2001 Tropical Cyclones of the World

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Year 2001 Tropical Cyclones of the World poster. During calendar year 2001, fifty tropical cyclones with sustained surface winds of at least 64 knots were observed...

  9. Contract law as fairness

    NARCIS (Netherlands)

    Klijnsma, J.

    2015-01-01

    This article examines the implications for contract law of Rawls' theory of justice as fairness. It argues that contract law as an institution is part of the basic structure of society and as such subject to the principles of justice. Discussing the basic structure in relation to contract law is

  10. Contractibility of curves

    Directory of Open Access Journals (Sweden)

    Janusz Charatonik

    1991-11-01

    Full Text Available Results concerning contractibility of curves (equivalently: of dendroids are collected and discussed in the paper. Interrelations tetween various conditions which are either sufficient or necessary for a curve to be contractible are studied.

  11. Book-Smart, Not Street-Smart: Blockchain-Based Smart Contracts and The Social Workings of Law

    Directory of Open Access Journals (Sweden)

    Karen E. C. Levy

    2017-02-01

    Full Text Available This paper critiques blockchain-based “smart contracts,” which aim to automatically and securely execute obligations without reliance on a centralized enforcement authority. Though smart contracts do have some features that might serve the goals of social justice and fairness, I suggest that they are based on a thin conception of what law does, and how it does it. Smart contracts focus on the technical form of contract to the exclusion of the social contexts within which contracts operate, and the complex ways in which people use them. In the real world, contractual obligations are enforced through all kinds of social mechanisms other than formal adjudication—and contracts serve many functions that are not explicitly legal in nature, or even designed to be formally enforced. I describe three categories of contracting practices in which people engage (the inclusion of facially unenforceable terms, the inclusion of purposefully underspecified terms, and willful nonenforcement of enforceable terms to illustrate how contracts actually “work.” The technology of smart contracts neglects the fact that people use contracts as social resources to manage their relations. The inflexibility that they introduce, by design, might short-circuit a number of social uses to which law is routinely put. Therefore, I suggest that attention to the social and relational contexts of contracting are essential considerations for the discussion, development, and deployment of smart contracts.

  12. The forms of protection civil rights parties of the bank deposit contract

    Directory of Open Access Journals (Sweden)

    Юрій Миколайович Моісеєнко

    2017-03-01

    Full Text Available The article is dedicated to analyze the forms of protection civil rights parties of the bank deposit contract considering the statistical data in regard to banks which allow violations of these rights and necessity to restore these rights by competent bodies. Fixing in civil legislation a number of opportunities to protect these rights with the existing economic crisis, especially in banking field, have practical importance that based on the efficiency of any form. Therewith, research the peculiarities of protection violated civil rights of the bank deposit contract in judicial, administrative and other forms. Attention is drawn on the peculiarities of some forms of protection. So, emphasizing the certain duration of judicial protection, alternatives opportunities of protection and restoration the violated rights of parties of the bank deposit contract is analyzed by the author. However, due to lack of effective mechanisms for protection the rights of parties of mentioned contract, the author proposed some ways for improving protection the violated rights of parties of the bank deposit contract.

  13. La mortalidad por suicidios: México 1990-2001 Mortality from suicides: Mexico, 1990-2001

    OpenAIRE

    Esteban Puentes-Rosas; Leopoldo López-Nieto; Tania Martínez-Monroy

    2004-01-01

    OBJETIVO: Describir la mortalidad por suicidios en México en 2001, así como los principales cambios en los métodos de suicidio y en la estructura por edades y sexos que se han presentado desde 1990, tanto a escala nacional como por entidad federativa. MÉTODOS: Para este estudio descriptivo se utilizaron como fuentes de informaci��n los registros oficiales de mortalidad del Instituto Nacional de Estadística, Geografía e Informática para el período de 1990 a 2001. Para calcular las tasas de mor...

  14. The trend of occupational injuries in Korea from 2001 to 2010.

    Science.gov (United States)

    Rhee, Kyung Yong; Choe, Seong Weon; Kim, Young Sun; Koo, Kwon Ho

    2013-03-01

    This study is planned to assess the trend of occupational injuries in Korea from 2001 to 2010. Ten years of occupational injuries, from 2001 to 2010, were analyzed in order to investigate the changing profiles according to the various characteristics of injuries; economic sectors, age of the injured, and type of injuries. The changing profile of occupational injuries was investigated by comparison with an index-created relative value based on the number of cases of reference category. The fatalities of construction, forest, agriculture, and service show the increasing trend. The nonfatal occupational injuries of the manufacturing sector were higher than those of other sectors in every year but the fatal occupational injuries of construction workers were higher than those of the manufacturing sector. Occupational injuries occurring due to amputation and those of slip and trip increased. The number of occupational injuries for the worker groups of 24 years old and below decreased and 45 years old and above increased. In comparison to the figure of fall from height, the figures of slip and trip or caught in equipment are higher in every calendar year. This study find out construction, forest, agriculture, and service sectors, aged worker with 45 years old and over can be target population for the strategies of occupational safety.

  15. EFFE 2001 konverents Tallinnas / Tiiu Kuurme

    Index Scriptorium Estoniae

    Kuurme, Tiiu, 1953-

    2001-01-01

    24.- 27. maini 2001 toimub Tallinnas EFFE 2001 (European Forum for Freedom in Education) konverents "Haridus tänases kodanikuühiskonnas". Konverentsi korraldavad Sirje Priimägi ja Tiiu Kuurme. Arutatakse lapse, lapsevanema, õpetaja ja kooli vabaduse teemat. European Forum for Freedom in Education ehk EFFE on üleeuroopaline organisatsioon, mis ühendab alternatiivpedagoogiliste ja humanistlike liikumiste esindajaid

  16. Effect of near-infrared lasers on myofibroblast differentiation and contraction

    Science.gov (United States)

    Vaughan, Melville B.; Spencer, Chelsea L.; Goddard, Jessica D.; Jose, Jessnie; Chen, Wei R.

    2012-03-01

    The ability to modulate the myofibroblast phenotype will have important implications in wound healing, aging and cancer development. Our objective was to determine whether irradiation using a 980-nm laser affects the presence of myofibroblasts and cellular contractility using an attached collagen lattice model. Fibroblasts in type I collagen lattices were allowed to generate tension for 5 days in the presence or absence of laser light stimulation on day 4. Immunostaining was used to determine the total number of cells in a representative image and percentage of myofibroblasts in the same image; tension generation was determined by releasing tension and measuring diameter change over time. One treatment demonstrated a slight lattice contraction increase over control, correlated with increased cell number. Myofibroblast percentage was low and was not correlated with lattice contraction. More experiments are necessary due to limited sample size and lack of large deviations from the control.

  17. Study of impacts of physical contracts and financial contracts on bidding strategies of GENCOs

    International Nuclear Information System (INIS)

    Xiaoling Chen; He, Y.; Song, Y.H.

    2004-01-01

    This paper studies the impacts of physical contracts and financial contracts on the bidding strategies of GENCOs, including Physical Bilateral Contracts, Contracts for Difference (CfDs), Call Options and Put Options under discriminatory pricing mechanism. The integrated bidding decision model is applied, which has three main modules - probabilistic local marginal price simulator, market-oriented unit commitment model and multi-criteria decision system. The numerical results show that the GENCO will choose different bidding strategies if it holds different types of contract. The results also suggest that CfDs have the best performance for risk alleviation. (author)

  18. Bibliography of Work on the Heterogeneous Photocatalytic Removal of Hazardous Compounds from Water and Air--Update Number 4 to October 2001

    Energy Technology Data Exchange (ETDEWEB)

    Blake, D.

    2001-11-19

    This report is the fifth in a series of bibliographies of work on the photocatalytic oxidation of organic or inorganic compounds in air or water and on the photocatalytic reduction of inorganic compounds in water. This search contains information extracted from 1149 new references to papers, books, and reports from searches conducted between October 1996 and April 2001.

  19. Analysis of foreign petroleum contracts

    International Nuclear Information System (INIS)

    Moran, S.S.

    1991-01-01

    Most foreign exploration and production contracts are of two basic types: Production-Sharing contracts in which a portion of oil revenues, 'cost oil,' is available to the contractor for recoupment of exploration and production costs with the remainder, 'profit oil,' being shared according to an agreed-upon formula, and the familiar Tax-Royalty contract in which a share of petroleum revenues goes to the host country 'off the top' as royalties, and operating profits are taxed at the going rate. Bottom line splits of profits between host governments and contractors, which are approximately 50-50 in the United States, are typically in the 60-40 to 85-15 range elsewhere, with lower profit shares being offset by the higher volume potential and lower costs that may be associated with less mature exploration areas. Foreign contract qualities can be grossly compared by walking typical field models through the contracts to arrive at the bottom line profit splits. Variations within the contract forms include government participation, sliding scale contract elements, special taxes related to rates of return, etc. Often, contract terms are subject to negotiation and the tradeoffs between contract elements must be understood. Contract life, amortization schedules, fund repatriation, currency exchange rates, and the interaction of foreign and United States tax regimens are among the other factors that must be considered. Final decisions on foreign ventures must combine consideration of contracts, economic projections, hydrocarbon volumes, exploration cost estimates, and the estimated probability of success into an overall project assessment

  20. Options contracts in the nuclear fuel industry

    International Nuclear Information System (INIS)

    Fuller, D.M.

    1995-01-01

    This article discusses options trading in the nuclear fuels industry. Although there now exists no formal options market in the nuclear industry, flexibilities, or embedded options, are actually quite common in the long-term supply contracts. The value of these flexibilities can be estimated by applying the methods used to evaluate options. The method used is the Black-Scholes Model, and it is applied to a number of examples

  1. The Impact of the Choice of Evaluation Criteria and the Type of Tender on the Awarding Public Contracts (in the Case of Construction Contracts at the Local Level in the Czech Republic

    Directory of Open Access Journals (Sweden)

    František Ochrana

    2015-01-01

    Full Text Available Public procurement may be examined from different perspectives. Using the Czech Republic as an example, this study is devoted to examining the impact of decisions made by the contracting authority regarding a public tender on the tender process itself and on the outcomes of the tender. The contracting authority addresses a number of decision-making issues regarding public procurements. For example, it needs to decide between two types of criteria (choosing between a single-criterion evaluation or rather opting for several evaluation criteria. At the same time, the authority is free to choose among different types of award procedures while adhering to certain restrictions imposed by the Act on Public Contracts. Using a sample of 1,027 construction work contracts awarded in the Czech Republic, the study examines, in more detail, the impacts of individual choices made by the contracting authority (namely the type of evaluation criteria chosen and the type of procedure for awarding contracts on the estimated and final price of public contracts. Recommendations on how to streamline the process of public procurement can be drawn from conclusions from the empirical analysis.

  2. Nuclear safety review for the year 2001

    International Nuclear Information System (INIS)

    2002-07-01

    The Nuclear Safety Review for the Year 2001 reports on worldwide efforts to strengthen nuclear and radiation safety, including radioactive waste safety. It is in three parts. Part 1 describes those events in 2001 that have, or may have, significance for nuclear, radiation and waste safety worldwide. It includes developments such as new initiatives in international cooperation, events of safety significance and events that may be indicative of trends in safety. Part 2 describes some of the IAEA's efforts to strengthen international co-operation in nuclear, radiation and waste safety during 2001. It covers legally binding international agreements, non-binding safety standards, and provisions for the application of safety standards. This is done in a very brief manner, because these issues are addressed in more detail in the Agency's Annual Report for 2001. Part 3 presents a brief look ahead to some issues that are likely to be prominent in the coming year(s). The topics covered were selected by the IAEA Secretariat on the basis of trends observed in recent years, account being taken of planned or expected future developments. A draft of the Nuclear Safety Review for the Year 2001 was presented to the March 2002 session of IAEA's Board of Governors. This final version has been prepared taking account of the discussion in the Board. In some places, information has been added to describe developments early in 2002 that were considered pertinent to the discussion of events during 2001

  3. An unsatisfactory contract policy

    CERN Multimedia

    Association du personnel

    2012-01-01

    For the last 15 years contract policy has been one of the top priorities of CERN staff, as expressed in successive surveys initiated by the Staff Association. In one’s professional life, having some forward vision of one’s career prospects is the key to loyalty and motivation. On the contrary, instability about the future is always at the root of anxiety, conflicts, or even health problems. A good employer must therefore balance the needs of the Company and those of its employees. CERN’s current contract policy, as described in the Administrative Circular No 2, states that staff members should first obtain a limited duration (LD) contract of up to five years. Then, if they want to stay in the Organization, staff members must apply, usually once a year, and before the end of their LD contract, for an indefinite contract (IC) post. All candidates for an IC post are considered by the Review Board for the award of indefinite contracts (Review Board) which will choose the most suita...

  4. Savannah River Site. Environmental report for 2001

    Energy Technology Data Exchange (ETDEWEB)

    Arnett, Margaret W. [Westinghouse Savannah River Co., Aiken, SC (United States). Savannah River Site. ed; Mamatey, Albert R. [Westinghouse Savannah River Co., Aiken, SC (United States). Savannah River Site. ed

    2001-12-31

    The goal of the Savannah River Site (SRS)—and that of the U.S. Department of Energy (DOE)—is positive environmental stewardship and full regulatory compliance, with zero violations. The site’s employees maintained progress toward achievement of this goal in 2001, as demonstrated by examples in this chapter. The site’s compliance efforts were near-perfect again in 2001. No notices of violation (NOVs) were issued in 2001 under the Resource Conservation and Recovery Act (RCRA), the Safe Drinking Water Act (SDWA), or the Clean Water Act (CWA). Two NOVs were issued to SRS during 2001—one, associated with permit requirement compliance, was issued under the Clean Air Act (CAA); the other, related to an oil release, was issued under the South Carolina Pollution Control Act. Under the CWA, the site’s National Pollutant Discharge Elimination System (NPDES) compliance rate was 99.6 percent. Also, 274 National Environmental Policy Act (NEPA) reviews of newly proposed actions were conducted and formally documented in 2001, and only one of the year’s 799 Site Item Reportability and Issues Management (SIRIM) program-reportable events was categorized as environmental; it was classified as an off-normal event.

  5. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 89

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    Summaries are presented for the DOE contracts related to supported research for thermal recovery of petroleum, geoscience technology, and field demonstrations in high-priority reservoir classes. Data included for each project are: title, contract number, principal investigator, research organization, beginning date, expected completion date, amount of award, objectives of the research, and summary of technical progress.

  6. Ontologies for commitment-based smart contracts

    NARCIS (Netherlands)

    de Kruijff, Joost; Weigand, Hans; Panetto, H; Debruyne, C.; Gaaloul, W.; Papazoglou, M.; Paschke, A.; Ardagna, C.A.; Meersman, R.

    2017-01-01

    Smart contracts gain rapid exposure since the inception of blockchain technology. Yet there is no unified ontology for smart contracts. Being categorized as coded contracts or substitutes of conventional legal contracts, there is a need to reduce the conceptual ambiguity of smart contracts. We

  7. 48 CFR 46.314 - Transportation contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Transportation contracts... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.314 Transportation contracts. The contracting officer shall insert the clause at 52.246-14, Inspection of Transportation, in solicitations and contracts for freight...

  8. Contracting for nuclear fuels

    International Nuclear Information System (INIS)

    Schuessler, C.M.

    1981-10-01

    This paper deals with uranium sales contracts, i.e. with contractual arrangements in the first steps of the fuel cycle, which cover uranium production and conversion. The various types of contract are described and, where appropriate, their underlying business philosophy and their main terms and conditions. Finally, the specific common features of such contracts are reviewed. (NEA) [fr

  9. Towards Certified Management of Financial Contracts

    DEFF Research Database (Denmark)

    Bahr, Patrick; Berthold, Jost; Elsman, Martin

    2014-01-01

    . The seminal work by Peyton-Jones and Eber on financial contracts shows how an algebraic approach to contract specification can be used for valuation of contracts (when combined with a model of the underlying observables) and for managing how contracts evolve under so-called fixings and decision......-taking, with the contracts eventually evaporating into the empty contract, for which no party have further obligations. The ideas have emerged into Eber's company LexiFi, which has become a leading software provider for a range of financial institutions, with all contract management operations centralised around a domain......Banks and financial institutions nowadays often use domain-specific languages (DSLs) for describing complex financial contracts, in particular, for specifying how asset transfers for a specific contract depend on underlying observables, such as interest rates, currency rates, and stock prices...

  10. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 3, Appendix M, Contract Copies.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This report, is part of the final environmental impact statement of the Bonneville Power Administration, consists of an appendix of contract copies related to the following: Detailed Index to Generic Utility Power Sales Contracts, Text of Generic Utility Contract, Detailed Index to Generic DSI Power Sales Contracts, Text of Generic DSI Contract, Text of Residential Purchase and Sale Agreement (Residential Exchange), and Detailed Index to General Contract Provisions -- GCP Form PSC-2 (Incorporated into all three types of contracts as an Exhibit).

  11. Annual report and balance 2001; Memoria y balance 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    A summary of the research, development, services and production activities of the National Atomic Energy Commission (CNEA) of Argentina is given as well as details of management resources together with the evolution of the budget. The activities of the CNEA related companies during 2001 are also outlined. A special mention is made of the activities of the three CNEA educational and training institutes.

  12. Contraction rate, flow modification and bed layering impact on scour at the elliptical guide banks

    Science.gov (United States)

    Gjunsburgs, B.; Jaudzems, G.; Bizane, M.; Bulankina, V.

    2017-10-01

    Flow contraction by the bridge crossing structures, intakes, embankments, piers, abutments and guide banks leads to general scour and the local scour in the vicinity of the structures. Local scour is depending on flow, river bed and structures parameters and correct understanding of the impact of each parameter can reduce failure possibility of the structures. The paper explores hydraulic contraction, the discharge redistribution between channel and floodplain during the flood, local flow modification and river bed layering on depth, width and volume of scour hole near the elliptical guide banks on low-land rivers. Experiments in a flume, our method for scour calculation and computer modelling results confirm a considerable impact of the contraction rate of the flow, the discharge redistribution between channel and floodplain, the local velocity, backwater and river bed layering on the depth, width, and volume of scour hole in steady and unsteady flow, under clear water condition. With increase of the contraction rate of the flow, the discharge redistribution between channel and floodplain, the local velocity, backwater values, the scour depth increases. At the same contraction rate, but at a different Fr number, the scour depth is different: with increase in the Fr number, the local velocity, backwater, scour depth, width, and volume is increasing. Acceptance of the geometrical contraction of the flow, approach velocity and top sand layer of the river bed for scour depth calculation as accepted now, may be the reason of the structures failure and human life losses.

  13. 7 CFR 631.14 - Contract violations.

    Science.gov (United States)

    2010-01-01

    ... AGRICULTURE LONG TERM CONTRACTING GREAT PLAINS CONSERVATION PROGRAM Contracts § 631.14 Contract violations. Contract violations, determinations and appeals will be handled in accordance with the terms of the... 7 Agriculture 6 2010-01-01 2010-01-01 false Contract violations. 631.14 Section 631.14 Agriculture...

  14. 77 FR 3288 - International Mail Contract

    Science.gov (United States)

    2012-01-23

    ... as the baseline contract for future functional equivalence analyses of the GREP Contracts 1 product... Classification Schedule language for GREP Contracts 1. The Postal Service identifies general contract terms that... methodology, the relevant characteristics of this GREP contract are similar, if not the same, as the relevant...

  15. 48 CFR 837.403 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 837.403... OF CONTRACTING SERVICE CONTRACTING Nonpersonal Health Care Services 837.403 Contract clause. The contracting officer shall insert the clause at 852.237-7, Indemnification and medical liability insurance, in...

  16. 48 CFR 811.503 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 811.503... ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Liquidated Damages 811.503 Contract clause. When the contracting... contracting officer must include the clause in 852.211-74, Liquidated damages, in the contract. ...

  17. Streamnet; Northwest Aquatic Information Network, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, Bruce (Pacific States Marine Fisheries Commission, Gladstone, OR)

    2002-05-24

    This report presents accomplishments of the StreamNet project for Fiscal Year 2001 (FY-01). The report is organized by Task, rather than by participating agency, to clearly link accomplishments by all project participants to the individual Tasks and responsibilities detailed in the FY-01 Statement of Work. The StreamNet Project was somewhat hampered in FY-01 by a delay in final approval of the project budget. The effective project budget has been eroded by cost of living adjustments not keeping up with the actual inflationary cost increases. For example, the project was recently impacted by an unanticipated increase in the federal pay scales for computer technology personnel. This is significant because the project budget is primarily composed of personnel costs (84%). Resultant reductions in workforce have led to a consistent decrease in the ability of the project to conduct its work. The budget request for FY-01 was initially proposed to make up for past differences, but the size of the requested increase caused additional review, and the final budget was not approved until approximately half way through the fiscal year. The increased request was not granted and only a 5% cost of living increase was approved. This resulted in some work beginning late and some work not being done. Several staff members at the Regional level could be funded for only 9 months, forcing those positions to do other work on other contracts for part of the year. A contract to develop data compilations for subbasin summaries through NWPPC helped bridged that gap this year. The ODFW StreamNet Project had significant job vacancies in FY-01, so they took the largest proportion of the budget shortfall of the project cooperators for this year. This allowed the other cooperators to function more at a normal level, but resulted in Oregon not being able to update as many data sets as planned. Oregon was able to fill its vacant database manager position later in the year, and this person has

  18. The Lanthanide Contraction Revisited

    Energy Technology Data Exchange (ETDEWEB)

    Seitz, Michael; Oliver, Allen G.; Raymond, Kenneth N.

    2007-04-19

    A complete, isostructural series of lanthanide complexes (except Pm) with the ligand TREN-1,2-HOIQO has been synthesized and structurally characterized by means of single-crystal X-ray analysis. All complexes are 1D-polymeric species in the solid state, with the lanthanide being in an eight-coordinate, distorted trigonal-dodecahedral environment with a donor set of eight unique oxygen atoms. This series constitutes the first complete set of isostructural lanthanide complexes with a ligand of denticity greater than two. The geometric arrangement of the chelating moieties slightly deviates across the lanthanide series, as analyzed by a shape parameter metric based on the comparison of the dihedral angles along all edges of the coordination polyhedron. The apparent lanthanide contraction in the individual Ln-O bond lengths deviates considerably from the expected quadratic decrease that was found previously in a number of complexes with ligands of low denticity. The sum of all bond lengths around the trivalent metal cation, however, is more regular, showing an almost ideal quadratic behavior across the entire series. The quadratic nature of the lanthanide contraction is derived theoretically from Slater's model for the calculation of ionic radii. In addition, the sum of all distances along the edges of the coordination polyhedron show exactly the same quadratic dependency as the Ln-X bond lengths. The universal validity of this coordination sphere contraction, concomitant with the quadratic decrease in Ln-X bond lengths, was confirmed by reexamination of four other, previously published, almost complete series of lanthanide complexes. Due to the importance of multidentate ligands for the chelation of rare-earth metals, this result provides a significant advance for the prediction and rationalization of the geometric features of the corresponding lanthanide complexes, with great potential impact for all aspects of lanthanide coordination.

  19. Customer relationship management in the contract pharmaceutical industry: an exploratory study for measuring success.

    Science.gov (United States)

    Kros, John F; Nadler, Scott; Molis, Justin

    2007-01-01

    Managing customer relationships is a very important issue in business-to-business markets. This research investigates the growing number of available resources defining Customer Relationship Management (CRM) efforts, and how they are being applied within the Contract Pharmaceutical Manufacturing industry. Exploratory study results using face-to-face and telephone questionnaires based on four criteria for rating a company's CRM efforts are presented. Data was collected from large Contract Pharmaceutical Manufacturing companies in the US market. The results and conclusions are discussed relating how the Contract Pharmaceutical Manufacturing industry is implementing CRM including some potential steps to take when considering a CRM initiative.

  20. Reference document 2001. A (AREVA) for.

    International Nuclear Information System (INIS)

    2002-01-01

    This reference document 2001, on the group Areva, provides data and information on the Areva emerges, overview of operations, sustainable development policy, research and development programs, nuclear power activities (front-end, reactors and services back-end divisions), components (connectors division and STMicroelectronics, human resources, share data and financial information (financial report 2001, financial report first-half 2002). (A.L.B.)

  1. Annual Statistical Supplement, 2001

    Data.gov (United States)

    Social Security Administration — The Annual Statistical Supplement, 2001 includes the most comprehensive data available on the Social Security and Supplemental Security Income programs. More than...

  2. The Indigenous World, 2001-2002 = El Mundo Indigena, 2001-2002.

    Science.gov (United States)

    Vinding, Diana, Ed.; Wessendorff, Kathrin, Ed.; Parellada, Alejandro, Ed.; Erni, Christian, Ed.; Jensen, Marianne, Ed.; Garcia-Alix, Lola, Ed.

    This document contains the English and Spanish texts of an annual publication which examines political, social, environmental, and educational issues concerning indigenous peoples around the world in 2001-02. Part 1 describes current situations and events in 11 world regions: the Arctic; North America; Mexico and Central America; South America;…

  3. Endogenous Market Structures and Contract Theory. Delegation, principal-agent contracts, screening, franchising and tying

    OpenAIRE

    Etro Federico

    2010-01-01

    I study the role of unilateral strategic contracts for firms active in markets with price competition and endogenous entry. Traditional results change substantially when the market structure is endogenous rather than exogenous. They concern 1) contracts of managerial delegation to non-profit maximizers, 2) incentive principal-agent contracts in the presence of moral hazard on cost reducing activities, 3) screening contracts in case of asymmetric information on the productivity of the managers...

  4. The effect of Fe segregation on the photocatalytic growth of Ag nanoparticles on rutile TiO{sub 2}(001)

    Energy Technology Data Exchange (ETDEWEB)

    Busiakiewicz, Adam, E-mail: adambus@uni.lodz.pl [University of Lodz, Faculty of Physics and Applied Informatics, Department of Solid State Physics, Pomorska 149/153, 90-236, Łódź (Poland); Kisielewska, Aneta; Piwoński, Ireneusz [University of Lodz, Faculty of Chemistry, Department of Materials Technology and Chemistry, Pomorska 163, 90-236, Łódź (Poland); Batory, Damian [Lodz University of Technology, Institute of Materials Science and Engineering, Stefanowskiego 1/15, 90-924, Łódź (Poland)

    2017-04-15

    Highlights: • Ag nanoparticles are grown photochemically on TiO{sub 2}(001). • Pristine TiO{sub 2}(001) and Fe/TiO{sub 2}(001) are compared. • The presence of segregated Fe strongly affects the growth Ag nanoparticles. • Abundant amount of Fe suppresses photocatalytic synthesis of AgNPs on TiO{sub 2}(001). - Abstract: The photocatalytic growth of silver nanoparticles (AgNPs) on rutile TiO{sub 2}(001) and Fe-modified rutile TiO{sub 2}(001) monocrystals was investigated. Various amount of Fe was segregated in a controlled way from the doped TiO{sub 2} substrates in ultra-high vacuum conditions resulting in low- medium- and high- content of Fe on TiO{sub 2} substrates. AgNPs were grown on pristine TiO{sub 2} and substrates containing Fe by photoreduction of Ag{sup +} ions under UV illumination. It was found that the size of AgNPs was larger on Fe/TiO{sub 2} than on TiO{sub 2} while the surface density exhibited the opposite behavior – a large number of AgNPs were present on the TiO{sub 2} surface but only a few AgNPs were visible on the Fe/TiO{sub 2} substrates. The reason for the differences in size and number of AgNPs on TiO{sub 2} and Fe/TiO{sub 2} is the limited access of Ag{sup +} to the TiO{sub 2} surface caused by the large number of Fe grains segregated onto the TiO{sub 2} surface. Another possible reason for the various AgNPs morphologies is alteration in the mechanism of Ag{sup +} photoreduction caused by iron present as Fe{sup 3+} ions and by newly formed AgNPs playing the role of electron traps. The surface elemental analysis of the investigated materials was performed with the use of X-ray photoelectron spectroscopy (XPS) and confirmed the composition of AgNPs/Fe/TiO{sub 2} systems. Scanning electron microscopy (SEM) and atomic force microscopy (AFM) revealed sizes, morphology and distribution of the nanostructures.

  5. France's answers to question and comments received from other contracting parties on its 1. report for the JC

    International Nuclear Information System (INIS)

    2003-10-01

    The Joint Convention on the safety of spent fuel management and on the safety of radioactive waste management is supplementing the Convention on Nuclear Safety. It was approved by France on February 22, 2000 and it entered into force on June 18, 2001. France has received 211 questions, coming from 19 Contracting Parties, on its first report and has provided written answers to each one. These answers were gathered in a single document, which lists them along the articles of the Convention. France has presented these answers on November 5, 2003, at the review meeting of the contracting Parties of the Convention and has decided to make them available to the public, however without mention of the countries that had asked them. The 211 questions received on the first report for the Joint Convention are listed along the sections suggested by the guidelines for the answers to the articles of the convention, sorted by the related page number of the French report and, within each section, grouped by issues raised. The written answers to each question have been coordinated by the French Nuclear Safety Authority (ASN), but have been provided either by the regulators or by the operators (or even both) depending on the related issue. In the case where various questions are related to a same issue but are referred to different articles of the Conventions, they have been referred to the most relevant article in order to have the same issue dealt with in a single location in the present answers report. The answer to each question is provided immediately under the related question

  6. IHEP 2001 annual report

    International Nuclear Information System (INIS)

    2002-01-01

    IHEP's focal points of research encompass high energy physics experiment and theory, cosmic ray and high energy astrophysics, theory of nuclear physics, nuclear detector and nuclear electronics, accelerator physics and technology, synchrotron radiation technology and application, nuclear analytical technique and application, free electron laser, computer and network application, radiation projection, etc. In 2001, IHEP further compacted its scientific goal by defining three key fields of high energy physics, research and development of advanced accelerator technologies, and advanced synchrotron radiation technologies and applications, as well as 10 relevant major research orientations. The plentiful results on scientific research, operation and upgrading of BEPC/BES/BSRF and other branches of work in 2001 are given in this annual report

  7. BOT Outsourcing Contracts

    DEFF Research Database (Denmark)

    Ørberg Jensen, Peter D.; Petersen, Bent

    2012-01-01

    Build-operate-transfer (BOT) contracting has been widely usen in the engineering and construction industry, but has only recently been introduced in services industry domains. Notably, service provider firms from emerging markets have recently started offering BOT outsourcing contracts. In this p...

  8. Comparing contracting performance

    DEFF Research Database (Denmark)

    Lindholst, Andrej Christian

    . Hypotheses are suggested for the role of culture, competition, contracts, capabilities and collaboration for contracting performance between and across the countries. Arguments are tested against data from on four comparable national surveys of private delivery of park and road maintenance services in local...

  9. 48 CFR 926.7104 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 926.7104... 1993. 926.7104 Contract clause. The contracting officer shall insert the clause at 48 CFR (DEAR) 952.226-74, Displaced Employee Hiring Preference, in contracts (except for contracts for commercial items...

  10. 48 CFR 822.305 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 822.305... PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Contract Work Hours and Safety Standards Act 822.305 Contract clause. The contracting officer shall insert the clause at 852.222-70, Contract Work...

  11. 48 CFR 52.222-51 - Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration...

    Science.gov (United States)

    2010-10-01

    ... of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment....222-51 Exemption from Application of the Service Contract Act to Contracts for Maintenance... clause: Exemption From Application of the Service Contract Act to Contracts for Maintenance, Calibration...

  12. 48 CFR 52.222-48 - Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration...

    Science.gov (United States)

    2010-10-01

    ... of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment....222-48 Exemption from Application of the Service Contract Act to Contracts for Maintenance... following provision: Exemption From Application of the Service Contract Act to Contracts for Maintenance...

  13. 24 CFR 891.560 - HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract. 891.560 Section 891... Assistance § 891.560 HAP contract. (a) HAP contract. The housing assistance payments contract sets forth.... (b) HAP contract execution. (1) Upon satisfactory completion of the project, the Borrower and HUD...

  14. nth roots of normal contractions

    International Nuclear Information System (INIS)

    Duggal, B.P.

    1992-07-01

    Given a complex separable Hilbert space H and a contraction A on H such that A n , n≥2 some integer, is normal it is shown that if the defect operator D A = (1 - A * A) 1/2 is of the Hilbert-Schmidt class, then A is similar to a normal contraction, either A or A 2 is normal, and if A 2 is normal (but A is not) then there is a normal contraction N and a positive definite contraction P of trace class such that parallel to A - N parallel to 1 = 1/2 parallel to P + P parallel to 1 (where parallel to · parallel to 1 denotes the trace norm). If T is a compact contraction such that its characteristics function admits a scalar factor, if T = A n for some integer n≥2 and contraction A with simple eigen-values, and if both T and A satisfy a ''reductive property'', then A is a compact normal contraction. (author). 16 refs

  15. 48 CFR 52.222-52 - Exemption from Application of the Service Contract Act to Contracts for Certain Services...

    Science.gov (United States)

    2010-10-01

    ... of the Service Contract Act to Contracts for Certain Services-Certification. 52.222-52 Section 52.222... from Application of the Service Contract Act to Contracts for Certain Services—Certification. As... Contract Act to Contracts for Certain Services—Certification (NOV 2007) (a) The offeror shall check the...

  16. 48 CFR 52.222-53 - Exemption from Application of the Service Contract Act to Contracts for Certain Services...

    Science.gov (United States)

    2010-10-01

    ... of the Service Contract Act to Contracts for Certain Services-Requirements. 52.222-53 Section 52.222... from Application of the Service Contract Act to Contracts for Certain Services—Requirements. As... Act to Contracts for Certain Services—Requirements (FEB 2009) (a) The services under this contract are...

  17. 2001 GUIDELINES FOR ADVANCEMENT AND EXCEPTIONAL PERFORMANCE AWARDS

    CERN Multimedia

    Human Resources Division

    2001-01-01

    1. General Following the recent Council decision that 1 September 2001 will be the date of entry into force of the new Career Structure conditions, the 2001 annual advancement exercise will be conducted on the same basis as in previous years. The practical details of the implementation of the new Career Structure conditions from 1 September 2001 and for future annual advancement exercises are presently subject to concertation between the Management and the Staff Association and will be communicated to the staff in due course. In the meantime, therefore, this year's exercise will take place within the present Staff Rules and Regulations, and following the procedures of the present Administrative Circular No. 26 (rev. 2). The effective date of decisions will be 1 July 2001. The Guidelines will be as described last year in CERN Bulletin 10/2000, of which the main aspects are summarised below. 2. Advancement guidelines The budget allocation for advancement in 2001 as a percentage of the basic salary cost is the s...

  18. Bottlenecks and contracts

    International Nuclear Information System (INIS)

    2001-01-01

    The report surveys the central points in the literature about contracts on geographical price differences and transmission rights in the power market. It is commonly believed that such contracts may reduce market power and contribute to better network investments. The theoretical debate is in part unfinished and largely based on very stylised assumptions. There is some indication that such contracts may not be very useful in practice. But they may be useful in some cases, perhaps in particular when power is transported outside limited surplus areas and for certain investment decisions where there is no systems operator with a natural responsibility

  19. Proceedings of the 2001 ASCUE Summer Conference (34th, North Myrtle Beach, South Carolina, June 10-14, 2001).

    Science.gov (United States)

    Smith, Peter, Ed.

    This 2001 Association of Small Computer Users in Education (ASCUE) conference proceedings briefly describes ASCUE and its listserver, lists the 2000-2001 ASCUE Board Members, and provides abstracts of the pre-conference workshops. The conference papers and abstracts of papers that follow include: "Microsoft Project 2000--Keeping Projects on Time…

  20. Perceived Effects of Prevalent Errors in Contract Documents on Construction Projects

    Directory of Open Access Journals (Sweden)

    Oluwaseun Sunday Dosumu

    2018-03-01

    Full Text Available One of the highly rated causes of poor performance is errors in contract documents. The objectives of this study are to investigate the prevalent errors in contract documents and their effects on construction projects. Questionnaire survey and 51 case study projects (mixed method were adopted for the study. The study also involved the use of Delphi technique to extract the possible errors that may be contained in contract documents; it did not however constitute the empirical data for the study. The sample of the study consists of 985 consulting and 275 contracting firms that engaged in the construction of building projects that were completed between 2013 and 2016 and were above the ground floor. The two-stage stratified random sampling technique was adopted for the study. The data for the study were analysed with descriptive and inferential statistics (based on Shapiro-Wilk’s test. The results of the study indicate that errors in contract documents were moderately prevalent. However, overmeasurement in bill of quantities was prevalent in private, institutional and management procured projects. Traditionally procured projects contain 68% of the errors in contract documents among the procurement methods. Drawings contain the highest number of errors, followed by bill of quantities and specifications. The severe effects of errors in contract documents were structural collapse, deterioration of buildings and contractors’ claims among others. The result of the study implies that, management procurement method is the route to error minimization in developing countries, but it may need to be backed by law and guarded against overmeasurement.

  1. Suicide and accidental deaths in children and adolescents in England and Wales, 2001-2010.

    Science.gov (United States)

    Windfuhr, Kirsten; While, David; Hunt, Isabelle M; Shaw, Jenny; Appleby, Louis; Kapur, Nav

    2013-12-01

    To investigate the impact of narrative verdicts on suicide statistics among 10-19-year-olds; to identify the number and rate of suicide and accidental deaths, particularly in 10-14-year-olds. National cohort study. England and Wales. Mid-year population estimates from the Office for National Statistics (ONS) were used to calculate rates per 100,000 population for suicide (undetermined and suicide verdicts) and accidental deaths (poisoning, hanging) for those aged 10-14 and 15-19. Trends in rates over time (2001-2010) were investigated using Poisson regression. Interaction tests were carried out to determine differences in trends between the two time periods (2001-2005 and 2006-2010). There were 1523 suicides (2.25/100,000). Suicide rates were highest in those aged 15-19 years (4.04/100,000) and in males (3.14/100,000). Between 2001 and 2010, rates significantly decreased among those aged 15-19 years (incidence rate-ratio (IRR): 0.95; 95% CI 0.93 to 0.97), with no change in rates of accidental deaths (IRR: 1.01, 95% CI 0.95 to 1.07). However, there was a significant interaction between the two time periods for accidental poisonings (2001-2005: IRR: 0.79 (95% CI 0.69 to 0.91); 2006-2010: IRR: 1.01 (95% CI 0.89 to 1.15), interaction p=0.012) and accidental hangings (2001-2005: IRR: 0.93 (95% CI 0.76 to 1.14); 2006-2010: IRR: 1.25 (95% CI 1.04 to 1.49), interaction=0.01) Undetermined deaths significantly decreased among females aged 15-19 yeras (IRR: 0.93; 95% CI 0.88 to 0.98). There were no significant trends among 10-14-year-olds. Rates of suicide are higher among older adolescents and males. There was a significant fall in suicide rates in males aged 15-19 years that was not accounted for by changes in rates of accidental death. The absence of a significant trend in suicide or accidental deaths in those aged 10-14 years may have been the result of small numbers. However, monitoring should continue to identify longitudinal trends in all young people.

  2. Language barrier, funding, communication and time management problems found in the Medical Journal of Indonesia, 1995 - 2001

    Directory of Open Access Journals (Sweden)

    Isnani A. Suryono

    2001-12-01

    Full Text Available The objective of this study is to assess the problems encountered in the management of Medical Journal of Indonesia and whether any progress has been achieved during the past 7 years. A retrospective descriptive study was done in the MJI. Available data used as parameters were: number of articles submitted and author's home institution, number of articles submitted and rejected, cause/criteria of rejection, qualification of reviewers and editors, duration of manuscript processing, and whether pre-scheduled time is met in the Med J Indones. For this purpose, all manuscripts from January 1995- January 2001 were evaluated. In addition, recent problems encountered were noted. Problems encountered were limited supply of manuscript that might be due to language barrier, decrease in circulation due to limited budget, communication problems due to seniority, and increase in average processing time that might be due to restriction in the time allocated for MJI Number of articles submitted by authors originating from national versus foreign institutions in 1995-1997 was 101 versus 16, and in 1998 - 2000 were 124 versus 84. Articles rejected were ±26.4 % (1999-2001 and the most frequent causes of rejection were insignificancy of substance and improper data analysis. As for the qualification of editors there was an increase in the number of PhDs and professors. Average processing time is approximately 1.5 times the scheduled time. It seems that the 4 main problems encountered were (1 Language barrier, (2 Funding, (3 Communication problems and (4 Time management; and though not impressive, there are definitely positive changes in the number of manuscipts submitted, qualification of editors and peer reviewers. Average processing time is about the same, and the prescheduled time of editing is yet to be met. (Med J  Indones 2001; 10: 252-8Keywords: language barrier, funding, communication problems, time management

  3. Performance contracting to engage detoxification-only patients into continued rehabilitation.

    Science.gov (United States)

    Haley, Sean J; Dugosh, Karen Leggett; Lynch, Kevin G

    2011-03-01

    In 2006, only 18.7% of Delaware's detoxification patients were admitted to continuing recovery-oriented treatment within 30 days after discharge. In response, Delaware established financial contingencies to (1) maintain 90% detoxification occupancy, (2) make receipt of 10% of the facility's monthly reimbursement contingent on 25% of patients entering treatment, and (3) provide a $500 bonus for every patient with three or more prior detoxification visits who was retained in treatment. Under the performance contract, the detoxification provider (1) maintained the 90% occupancy requirement, (2) achieved the 25% treatment entry target for 7 of 12 months, and (3) observed only 8% (27/337) of detoxification completions that met the targeted length of stay. Continuation to and retention in treatment was even more constrained for patients with three or more prior detoxifications. Contrary to the policy intent, the number of patients with three or more detoxifications in fiscal year (FY) 2008 is nearly triple that of FY 2006. The modest gain in the transition rate was achieved without changes in patient access; the FY 2008 patient population reported significantly higher rates of homelessness and a younger age of first use than before the performance contract in FY 2006. Performance contracting may offer promise for improving transition to treatment rates. However, the unique needs of detoxification patients, the treatment capacity of each level of care to meet patient needs, and the structure of the performance contract must be carefully considered. Performance contracting efforts may be strengthened when service contracts across the system are tightly synchronized. Copyright © 2011 Elsevier Inc. All rights reserved.

  4. Swiss energy statistics 2001; Schweizerische Gesamtenergiestatistik 2001/Statistique globale suisse de l'energie 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This comprehensive report presents the Swiss Federal Office of Energy's statistics on energy production and consumption in Switzerland in 2001. Facts and figures are presented in tables and diagrams. First of all, a general overview of Swiss energy consumption is presented that includes details on the shares taken by the various energy carriers involved and their development during the period reviewed. The article also includes graphical representations of energy usage in various sectors such as households, trade and industry, transport and the services sector. Also, economic data on energy consumption is presented. A second chapter takes a look at energy flows from producers to consumers and presents an energy balance for Switzerland in the form of tables and an energy-flow diagram. The individual energy sources and the import, export and storage of energy carriers are discussed as is the conversion between various forms and categories of energy. Details on the consumption of energy, its growth over the years up to 2001 and energy use in various sectors are presented. Finally, the Swiss energy balance with reference to the use of renewable sources of energy such as solar energy, biomass, wastes and ambient heat is discussed and figures are presented on the contribution of renewables to heating and the generation of electrical power.

  5. Quantification of contraction synchronicity and contraction work in coronary artery disease

    Energy Technology Data Exchange (ETDEWEB)

    Niimi, Takanaga; Nanasato, Mamoru [Nagoya Daini Red Cross Hospital, Nagoya (Japan); Maeda, Hisatoshi [Dept. of Radiological Technology, Nagoya University School of Health Sciences, Nagoya(Japan)

    2017-09-15

    This study quantified the contraction synchronicity (CS; with 100% representing full synchrony and −100% dyssynchrony) and contraction work (CW, millijoules per centimeter squared; representing myocardial area) in patients with reduced left ventricular ejection fraction (LVEF) associated with coronary artery disease (CAD)

  6. YouthCaN 2001 / Sirje Janikson

    Index Scriptorium Estoniae

    Janikson, Sirje

    2001-01-01

    Aprillis 2001 toimus keskkonnateemaline õpilaskonverents YouthCaN 2001 Ameerika Loodusajaloo Muuseumis New Yorkìs. 35 seminarist ühe viis läbi Tartu Noorte Loodusmaja geoloogia ja keskkonnaringi esindus, tutvustati loodusmaja keskkonnaprojekte ja räägiti keskkonnaalaste veebilehtede koostamise kogemustest. YouthCaN (Youth Communicating and Networking) on rahvusvaheline noorte organisatsioon, mis vahendab kogemusi ja uusi ideid elukeskkonnast huvitatud noorte hulgas

  7. Adult Chinook Salmon Abundance Monitoring in Lake Creek, Idaho, Annual Report 2001.

    Energy Technology Data Exchange (ETDEWEB)

    Faurot, Dave

    2002-12-01

    Underwater time-lapse video technology has been used to monitor adult spring and summer chinook salmon (Oncorhynchus tshawytscha) escapement into the Secesh River and Lake Creek, Idaho, since 1998. Underwater time- lapse videography is a passive methodology that does not trap or handle this Endangered Species Act listed species. Secesh River chinook salmon represent a wild spawning aggregate that has not been directly supplemented with hatchery fish. The Secesh River is also a control stream under the Idaho Salmon Supplementation study. This project has successfully demonstrated the application of underwater video monitoring to accurately quantify chinook salmon abundance in Lake Creek in 1998, 1999 and 2001. The adult salmon spawner escapement estimate into Lake Creek in 2001 was 697 fish, the largest escapement since the project began. Jack salmon comprised 10% of the spring migration. Snow pack in the drainage was 38% of the average during the winter of 2000/2001. The first fish passage on Lake Creek was recorded on June 9, 19 days after installation of the fish counting station and two weeks earlier than previously reported. Peak net upstream movement of 52 adults occurred on June 22. Peak of total movement activity was July 3. The last fish passed through the Lake Creek fish counting station on September 6. Redd count expansion methods were compared to underwater video determined salmon spawner abundance in Lake Creek in 2001. Expanded index area redd count point estimates and intensive area redd counts in 2001, estimated from 1.3 percent fewer to 56 percent greater number of spawners than underwater video determined spawner abundance. Redd count expansion values had unknown variation associated with the point estimates. Fish per redd numbers in Lake Creek have varied widely. In 2001 there were 2.07 fish per redd. In 1999, there were 3.58 fish per redd, and in 1998, with no jacks returning to spawn, there were 1.02 fish per redd. Migrating salmon in Lake Creek

  8. International nuclear power status 2001

    International Nuclear Information System (INIS)

    Lauritzen, B.; Majborn, B.; Nonboel, E.; Oelgaard, P.L.

    2002-04-01

    This report is the eighth in a series of annual reports on the international development of nuclear power with special emphasis on reactor safety. For 2001, the report contains: 1) General trends in the development of nuclear power; 2) Nuclear terrorism; 3) Statistical information on nuclear power production (in 2000); 4) An overview of safety-relevant incidents in 2001; 5) The development in West Europe; 6) The development in East Europe; 7) The development in the rest of the world; 8) Development of reactor types; 9) The nuclear fuel cycle; 10) International nuclear organisations. (au)

  9. Trends of public health research output from India during 2001-2008

    Directory of Open Access Journals (Sweden)

    Dandona Lalit

    2009-10-01

    Full Text Available Abstract Background An understanding of how public health research output from India is changing in relation to the disease burden and public health priorities is required in order to inform relevant research development. We therefore studied the trends in the public health research output from India during 2001-2008 that was readily available in the public domain. Methods The scope and type of the published research from India in 2007 that was included in the PubMed database was assessed and compared with a previous similar assessment for 2002. Papers were classified based on the review of abstracts and original public health research papers were assessed in detail. Impact factors for the journals were used to compute quality-adjusted research output. The websites of governmental organizations, academic and research institutions and international organizations were searched in order to identify and review reports on original public health research produced in India from 2001 to 2008. The reports were classified based on the topics covered and quality and their trends over time were assessed. Results The number of original health research papers from India in PubMed doubled from 4494 in 2002 to 9066 in 2007. This included a 3.1-fold increase in public health research papers, but these comprised only 5% of the total papers in 2007. Within public health, the increase was lowest for the health system and policy category. Several major causes of disease burden in India continued to be underrepresented in the quality-adjusted public health research output in 2007. The number of papers evaluating population health interventions increased from 2002 to 2007, but there were none on the leading non-communicable causes of disease burden or on road traffic injuries. The number of identified original public health research reports increased by 64.7% from 204 in 2001-2004 to 336 in 2005-2008. The proportion of reports on reproductive and child health was very

  10. Activity report 2001; Rapport annuel d'activite 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The DED, Department of the Wastes Studies, part of the Direction of the Nuclear Energy of the CEA, regroups knowledge in the domain of the chemistry, the biochemistry, the process measures and simulation engineering applied to the radioactive wastes management. This annual report presents for the year 2001 the missions, the organization, the scientific collaborations, the research programs and the publications of the Department. (A.L.B.)

  11. AICAR stimulation metabolome widely mimics electrical contraction in isolated rat epitrochlearis muscle.

    Science.gov (United States)

    Miyamoto, Licht; Egawa, Tatsuro; Oshima, Rieko; Kurogi, Eriko; Tomida, Yosuke; Tsuchiya, Koichiro; Hayashi, Tatsuya

    2013-12-15

    Physical exercise has potent therapeutic and preventive effects against metabolic disorders. A number of studies have suggested that 5'-AMP-activated protein kinase (AMPK) plays a pivotal role in regulating carbohydrate and lipid metabolism in contracting skeletal muscles, while several genetically manipulated animal models revealed the significance of AMPK-independent pathways. To elucidate significance of AMPK and AMPK-independent signals in contracting skeletal muscles, we conducted a metabolomic analysis that compared the metabolic effects of 5-aminoimidazole-4-carboxamide-1-β-D-ribonucleoside (AICAR) stimulation with the electrical contraction ex vivo in isolated rat epitrochlearis muscles, in which both α1- and α2-isoforms of AMPK and glucose uptake were equally activated. The metabolomic analysis using capillary electrophoresis time-of-flight mass spectrometry detected 184 peaks and successfully annotated 132 small molecules. AICAR stimulation exhibited high similarity to the electrical contraction in overall metabolites. Principal component analysis (PCA) demonstrated that the major principal component characterized common effects whereas the minor principal component distinguished the difference. PCA and a factor analysis suggested a substantial change in redox status as a result of AMPK activation. We also found a decrease in reduced glutathione levels in both AICAR-stimulated and contracting muscles. The muscle contraction-evoked influences related to the metabolism of amino acids, in particular, aspartate, alanine, or lysine, are supposed to be independent of AMPK activation. Our results substantiate the significance of AMPK activation in contracting skeletal muscles and provide novel evidence that AICAR stimulation closely mimics the metabolomic changes in the contracting skeletal muscles.

  12. LESSONS FROM THE CRISIS – TURKISH BANKING CRISIS OF 2000-2001

    Directory of Open Access Journals (Sweden)

    Gabriela PICIU

    2015-04-01

    Full Text Available In the past two decades or so the Turkish banking system has experienced many changes especially with the liberalization of the financial markets, financial inovations, inovations in the information technology and the increase in the number of financial transactions. With consolidations, competition has grown among banks and they are now competing for smaller profit margins. With all these changes, there has also been a change in the type of risks to which banks are now exposed. If the banking system in Turkey is following the right path as the authorities in Turkey claim then how did the country get into the grip of the banking crisis of 2000-2001? What went wrong and why bank loans turned into bad debts must be examined. The Turkish Experience resulting from the financial crisis of 2000-2001 shows that the country has learned the lesson. The financial crisis of 2008 hadn't an impact so great in Turkey compared with other countries.

  13. Contraction mode itself does not determine the level of mTORC1 activity in rat skeletal muscle.

    Science.gov (United States)

    Ato, Satoru; Makanae, Yuhei; Kido, Kohei; Fujita, Satoshi

    2016-10-01

    Resistance training with eccentric contraction has been shown to augment muscle hypertrophy more than other contraction modes do (i.e., concentric and isometric contraction). However, the molecular mechanisms involved remain unclear. The purpose of this study was to investigate the effect of muscle contraction mode on mammalian target of rapamycin complex 1 (mTORC1) signaling using a standardized force-time integral (load (weight) × contraction time). Male Sprague-Dawley rats were randomly assigned to three groups: eccentric contraction, concentric contraction, and isometric contraction. The right gastrocnemius muscle was exercised via percutaneous electrical stimulation-induced maximal contraction. In experiment 1, different modes of muscle contraction were exerted using the same number of reps in all groups, while in experiment 2, muscle contractions were exerted using a standardized force-time integral. Muscle samples were obtained immediately and 3 h after exercise. Phosphorylation of molecules associated with mTORC1 activity was assessed using western blot analysis. In experiment 1, the force-time integral was significantly different among contraction modes with a higher force-time integral for eccentric contraction compared to that for other contraction modes (P contraction compared to that for isometric contraction (P contraction than for other modes of contraction (P contraction was higher than isometric contraction (P contraction modes 3 h after exercise. Our results suggest that mTORC1 activity is not determined by differences in muscle contraction mode itself. Instead, mTORC1 activity is determined by differences in the force-time integral during muscle contraction. © 2016 The Authors. Physiological Reports published by Wiley Periodicals, Inc. on behalf of the American Physiological Society and The Physiological Society.

  14. Time trend of reported cases and publications: hepatitis E in comparison to hepatitis A - D in Germany from 2001 to 2016.

    Science.gov (United States)

    Wehmeyer, Malte H; Hartl, Johannes; von Wulffen, Moritz; Lohse, Ansgar W; Pischke, Sven

    2018-01-01

    The frequency of autochthonous hepatitis E virus (HEV) infections in Western countries has increased since the millennium, probably due to a higher awareness for HEV. The aim of this study was to analyze the epidemiological situation and regional distribution of HEV in comparison to hepatitis A - D in Germany. Data of the reported cases, patients' travel histories, and the regional distribution of hepatitis A - E virus infections from 2001 to 2017 were extracted from databases of the Robert Koch Institute. The number of publications per year on each hepatitis virus was used as a surrogate parameter for scientific awareness. The incidence of HEV infections increased from 31 reported cases in 2001 to 1991 cases in 2016 with a rate of autochthonous HEV infections of 44.4 % in 2001 and 83.9 % in 2016. In 2016, the HEV incidence was 4.4/100 000 in Eastern Germany and 2.0/100 000 in Western Germany. From 2001 to 2016, the numbers of hepatitis A and C virus infections decreased, while the number of hepatitis B virus infections initially decreased followed by an increase since 2014. The incidence of hepatitis D virus infections remained low. The incidence rates of hepatitis A - D virus infections were comparable between Eastern and Western Germany in 2016. There was a strong correlation between publications on HEV and reported HEV cases (Pearson r = 0.9803, p < 0.01). Especially in Eastern Germany, but also in Western Germany, the rate of reported HEV cases and the scientific awareness for this disease increased strongly since 2001. © Georg Thieme Verlag KG Stuttgart · New York.

  15. Temporary labour contracts

    CERN Document Server

    1999-01-01

    The five contracts for Temporary Labour assignments on the CERN site (L020/PE, L021/PE, L022/PE, L023/PE and L024/PE) approved by the Finance Committee in March 1996 (CERN/FC/3857) will reach the end of their initial three-year contractual period at the end of December 1999. Following the satisfactory execution of these contracts during this period, CERN requests approval to extend them from January 2000 for the first of the two years foreseen in the original adjudication. The Finance Committee is invited: - to take note that the three-year expenditure for Temporary Labour contracts from 1997 to 1999 will not exceed 19 100 000 Swiss francs, compared to the 18 900 000 Swiss francs estimated at the time of the adjudication in March 1996; - to approve an extension of the present Temporary Labour contracts for the year 2000 for a total amount not exceeding 6 000 000 Swiss francs.

  16. The Contracting Parties' Ability To Conclude The Employment Contract

    Directory of Open Access Journals (Sweden)

    Carmen Constantina NENU

    2014-08-01

    Full Text Available This study's main objective is to analyze certain effects produced by the changes of the Labor Code and by the entry into force of the current Romanian Civil Code. These effects refer to one of the fundamental conditions for the valid conclusion of the individual employment contract, that is, to the legal capacity of employers and employees. Thus, a complete analysis of legal regulations and of the correlations between different provisions on the legal capacity of parties to the individual employment contract is required to identify the existing noncompliance and to propose solutions. The research demonstrated that the current regulatory framework governing the legal capacity of the parties to an individual employment contract does not entirely correspond to the social reality. Therefore, only the employer benefits from a relatively comprehensive statutory regulation on the legal capacity to conclude an individual employment contract. The employee, however, does not benefit from the same attention from legislature. Considering the above, the study represents a significant scientific contribution, whose value lies in the proposed changes to modify legislature, so that the legal capacity of job holders would benefit from fair regulation, in accordance with the principle of legal protection of employee rights.

  17. Listing of engineering research contract reports under the DREAM, AERD and ERDAF programs of the Research Branch, 1973-1988

    Energy Technology Data Exchange (ETDEWEB)

    Morrison, B A; Thuns, A; Feldman, M

    1988-01-01

    To supplement in-house investigations, Agriculture Canada contracted out research in a number of programs including three which supported engineering work. This document lists the contracts awarded under the programs and provides reference citations of the contract reports. Reports are grouped by file number, scientific authority, author or contractor, and subject, and a subject index is also included. The three programs are: Development, Research and Evaluation in Agricultural Mechanization (DREAM), Agricultural Engineering Research and Development Program (AERD), and Energy Research and Development in Agriculture and Food (ERDAF). AERD, which replaced DREAM, has been terminated, but the ERDAF program is still continuing as of the date of this document.

  18. Marine environmental radioactivity surveys at nuclear submarine berths 2001

    International Nuclear Information System (INIS)

    Cowling, E.; Ball, R.; Simpson, C.

    2002-01-01

    This report presents the results of the marine environmental radioactivity monitoring surveys of intertidal and underwater areas around nuclear submarine berths which were carried out by DRPS during 2001. Also included are results of smaller scale intertidal surveys carried out by local staff but co-ordinated by DRPS. Cobalt-60, the nuclide of major importance in naval discharges, was detected in a number of samples but in many cases was attributable to discharges by other operators. Concentrations in any case were found to be low, and at no survey location did the calculated annual radiation dose commitment to the most exposed members of the general public due to the presence of cobalt-60 exceed 1% of the ICRP principal dose limit for members of the public (1000μSv). These results are consistent with those obtained in the independent monitoring programmes as reported in the Radioactivity in Food and the Environment (RIFE) annual reports. It is concluded that existing discharge arrangements are providing effective control over environmental levels of radioactivity, and that there has been no radiological hazard to any member of the general public during 2001 from the operation of nuclear powered submarines. (author)

  19. JURIDICAL WILL IN CONTRACTS

    Directory of Open Access Journals (Sweden)

    Emilian CIONGARU

    2015-07-01

    Full Text Available In the business law, almost all judicial relationships of private law are obligational juridical relationships which are made up of legal acts and facts. The most important legal act is the contract since it is the basis of the social life in any community meaning that it represents the most important economic and juridical instrument for the participants to a contract. The persons are free and equal in society and, consequently, no power is valid and fundamental unless it relies on their consent, namely on a contract. So, the existence of a civil contract relies on the principles of consensualism, a perception based on moral rules to observe one’s promises, to have good faith and to observe the interests of your fellow creature. The exterior manifestation, the expression or declaration of the juridical will constitutes the consent of such person in making the structure of contract. The declared will must correspond to the person’s real will and the adoption and declaration of the juridical will must take place consciously. Any contract that does not derive from juridical will is null and the civilizing character is inexistent. The principles giving sense to consensualism is the one of agreement between parties so as to produce legal effects by itself and it is enough for the conclusion of a contract, regardless of the form in which it is exteriorized, a principle expressed by the Latin adagio pacta sunt servanda.

  20. Terrorism preparedness in state health departments--United States, 2001-2003.

    Science.gov (United States)

    2003-10-31

    The anthrax attacks in fall 2001 highlighted the role of infectious disease (ID) epidemiologists in terrorism preparedness and response. Beginning in 2002, state health departments (SHDs) received approximately 1 billion dollars in new federal funding to prepare for and respond to terrorism, infectious disease outbreaks, and other public health threats and emergencies. This funding is being used in part to improve epidemiologic and surveillance capabilities. To determine how states have used a portion of their new funding to increase ID epidemiology capacity, the Iowa Department of Public Health's Center for Acute Disease Epidemiology and the Iowa State University Department of Microbiology conducted two surveys of U.S. state epidemiologists during September 2000-August 2001 and October 2002-June 2003. This report summarizes the results of these surveys, which determined that although the number of SHD epidemiology workers assigned to ID and terrorism preparedness increased by 132%, concerns remained regarding the ability of SHDs to hire qualified personnel. These findings underscore the need to develop additional and more diverse training venues for current and future ID epidemiologists.

  1. 32 CFR 2001.11 - Original classification authority.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Original classification authority. 2001.11... Classification § 2001.11 Original classification authority. (a) General. Agencies shall establish a training program for original classifiers in accordance with subpart G of this part. (b) Requests for original...

  2. Whither Performance Contracting?

    Science.gov (United States)

    Green, Norman S.

    This report describes briefly performance contracts; discusses their shortcomings, pitfalls, and advantages; and gives some insight into the future development of this new concept. Two shortcomings of performance contracting include (1) teaching to the test and (2) board abdication of its responsibility for making final decisions about educational…

  3. Democratic contract law

    NARCIS (Netherlands)

    Hesselink, M.W.

    2015-01-01

    This article discusses the normative relationship between contract law and democracy. In particular, it argues that in order to be legitimate contract law needs to have a democratic basis. Private law is not different in this respect from public law. Thus, the first claim made in this article will

  4. 48 CFR 916.504 - Indefinite-quantity contracts.

    Science.gov (United States)

    2010-10-01

    ... indefinite-quantity, multiple award contracts to ensure that adequate consideration exists to contractually... contracts. 916.504 Section 916.504 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Indefinite-Delivery Contracts 916.504 Indefinite-quantity...

  5. Agile Contracts

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Pries-Heje, Lene

    2014-01-01

    with “endless” re-negotiation of the requirements; you need a more flexible way to develop IS. A new way of coping with many changes is to use an agile development approach and a fixed budget and resources contract. This paper presents an example case. We analyse the case and design a guideline for how......When you have stable and non-ambiguous requirements then a classic contract for IS between a supplier and a public sector institution based on a requirements specification may be well suited. However, if you have to accept many changes or have ambiguous requirements then you may end up...... to implement a fixed budget and resources contract in the public sector. The guideline includes elements to cope with challenges in a tender process such as transparency, criteria for supplier selection, and live assessment of resource skills and capabilities, as well as achieving the flexibility for change...

  6. Iterative Contracts as Proactive Law Instruments

    DEFF Research Database (Denmark)

    Henschel, René Franz

    2012-01-01

    The purpose of this article is to analyse the use of proactive law in contracts illustrated by the use of a particular type of contract within the IT industry, the so-called iterative contract. This type of contract has its root in a special software development process called iterative and incre...... the potential to create more business success. However, empirical research still needs to be done in order to confirm that these types of contracts are better at securing business success than traditional contract forms....

  7. INDEFINITE CONTRACT REVIEW 2000

    CERN Multimedia

    Division des ressources humaines

    2000-01-01

    The Director-General has decided to review staff members in professional categories 2 to 5 satisfying the criteria for consideration for the award of an indefinite contract, in accordance with Article R II 1.20 of the Staff Regulations. Staff members holding a fixed-term contract which it has been decided not to renew will not be considered. The following stages are foreseen:1.\tCandidates qualifying for review in accordance with Article R II 1.20 of the Staff Regulations and the Administrative Circular N° 9 will be contacted by Human Resources Division. 2.\tThe criteria as to when staff members qualify for review are described in Administrative Circular N° 9. These include the following:staff members who are in their fourth year of service on a fixed-term contract;in addition, for staff members having three years or more of previous relevant service in the Organization on a contract of limited duration (or term-contract) and upon proposal by the division leader concerned, consid...

  8. Precarious Pedagogies? The Impact of Casual and Zero-Hour Contracts in Higher Education

    Directory of Open Access Journals (Sweden)

    Ana Lopes

    2015-05-01

    Full Text Available Precarious work is associated with and characterizes the effects of neoliberal policy—the transference of economic risk onto workers, the erosion of workers’ rights, the flexibilization and casualization of work contracts, self-responsibility, financial insecurity, and emotional stress. In the Higher Education (HE sector, the number of insecure academic jobs, especially zero-hour contracts for hourly paid teaching and short-term contract research, has grown exponentially in recent years in response to the structural and fiscal changes within universities, which reflect these global shifts. This paper presents findings from a pilot study conducted with academics on casual contracts in HE institutions in England and Wales. Qualitative interviews and focus groups were undertaken with teachers (lecturers and tutors on hourly paid and zero-hour contracts to examine the relationship between their contractual situations and pedagogical practices. The research broadly seeks to contribute to ongoing discussions concerned with the impact of neoliberalism on higher education and specifically highlights the case of contingent lecturers as casualties of the casualization of the academic labor force.

  9. Freedom of contract, mandatory and non-mandatory law in European contract law

    OpenAIRE

    Storme, M.

    2008-01-01

    Abstract: The purpose of this article is to reflect on the position and function of common European rules in respect of limitations to freedom of contract, and more specifically on the role of mandatory and non-mandatory rules in general. After dealing with this more generally in the first part, the article addresses in its second part the different techniques restricting freedom of contract that we find in the Principles of European Contract Law,(1) the acquis communautaire of the law of the...

  10. Scientific Report 2001

    International Nuclear Information System (INIS)

    2002-04-01

    The annual scientific report gives an overview of the R and D activities at the Belgian Nuclear Research Centre SCK-CEN in 2001. The report discusses progress and main achievements in four principal areas: Radiation Protection, Radioactive Waste and Clean-up, Reactor Safety and the BR2 Reactor

  11. Scientific Report 2001

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-04-01

    The annual scientific report gives an overview of the R and D activities at the Belgian Nuclear Research Centre SCK-CEN in 2001. The report discusses progress and main achievements in four principal areas: Radiation Protection, Radioactive Waste and Clean-up, Reactor Safety and the BR2 Reactor.

  12. Compositional specification of commercial contracts

    DEFF Research Database (Denmark)

    Andersen, Jesper; Elsborg, Ebbe; Henglein, Fritz

    2006-01-01

    -definable analysis of their state before, during and after execution. We provide several realistic examples of commercial contracts and their analyses. A variety of (real) contracts can be expressed in such a fashion as to support their integration, management and analysis in an operational environment......We present a declarative language for compositional specification of contracts governing the exchange of resources. It extends Eber and Peyton Jones’s declarative language for specifying financial contracts (Jones et al. in The Fun of Programming. 2003) to the exchange of money, goods and services...... amongst multiple parties and complements McCarthy’s Resources, Events and Agents (REA) accounting model (McCarthy in Account Rev. LVII(3), 554–578, 1982) with a view- independent formal contract model that supports definition of user-defined contracts, automatic monitoring under execution and user...

  13. 48 CFR 32.114 - Unusual contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Unusual contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.114 Unusual contract financing. Any contract financing arrangement that deviates from this part is unusual contract financing...

  14. Analysis of Developed Country's Export Contract and Contract Risk and Development of Sample Contract and Guide

    International Nuclear Information System (INIS)

    Lee, D. S.; Oh, K. B.; Chung, W. S.; Lee, K. S.; Yun, S. W.; Lee, J. H.; Lee, B. W.; Kim, H. J.; Yang, M. H.

    2008-10-01

    This paper aimed at developing legal support for the non nuclear power plant industry's export. This study aids establishing government policy and promoting export of non nuclear power plant industry. This paper treated analysis of contractual risk and caution before entering into contract. To promote continuing export result, governmental and legal aids and guide will be required continuously. This study showed risks related with export contract and explained export control acts and procedures

  15. Duplicate Recording of Contracts in the Mechanization of Contract Administration Services System

    National Research Council Canada - National Science Library

    Lane, F

    1996-01-01

    ... in more than one of the system's data bases. We also evaluated whether the Mechanization of Contract Administration Services system had adequate controls to detect and prevent duplicate contract payments, and whether database errors...

  16. The contract - introduction

    International Nuclear Information System (INIS)

    Loeffler, G.

    1975-01-01

    The contract is the last and final step of project planning and the first step of project implementation. The contract has to specify in detail and to the point, as concisely as possible, the complete scope of supplies and work, define all technical particulars and requirements, put forward the conditions of legal, regulatory, administrative and financial procedure, prepare for operating and maintenance instructions to be issued after commissioning. In short, the contract is expected to be a reliable instrument during the manufacturing and construction period as well as a guide-book to assist the owner afterwards in the operation and maintenance of the plant. (orig./FW) [de

  17. JAERI tandem annual report 2001. April 1, 2001 - March 31, 2002

    Energy Technology Data Exchange (ETDEWEB)

    Takeuchi, Suehiro; Ikezoe, Hiroshi; Chiba, Satoshi; Nagame, Yuichiro; Sataka, Masao; Iwamoto, Akira (eds.) [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2002-11-01

    This annual report describes research activities which have been performed with the JAERI tandem accelerator and the Van de Graaff accelerator from April 1, 2001 to March 31, 2002. Summary reports of 48 papers, and lists of publication, personnel and cooperative research with universities are contained. (author)

  18. The distribution contracts: an Iberian approach

    Directory of Open Access Journals (Sweden)

    Sónia de Carvalho

    2016-12-01

    Full Text Available The contracts of commercial distribution are indispensable legal instruments to the development of the economic activity. The distribution, since the industrial revolution, acquired autonomy, given the necessity of specialized intermediation to distribute good and products. In this process, the structural organization of the distribution process suffered mutations, starting to assume a set of activities aiming at adjusting demand to supply, including, among others, clients canvassing, after-sales services, financing and assumption of risks, advisory services, promotion and advertising. The insufficiency of traditional contracts of purchase and sales and commission to satisfy the distributive needs caused by the industrial revolution will justify the development of new contractual schemes, such us agency contract, commercial concession and franchising. The obligation of the distributer to ensure the interests of the producer and to promote the distribution of the goods and services of the producer, in the context of a lasting relation of cooperation between the parts, through which the distributer is incorporated, with greater or minor intensity, in the producer distribution network, allowed us to sustain, as affirmed in the Portuguese and European literature, that distribution contracts could be framed in the same legal category. These contracts, as contracts that were shaped by praxis, do not have, with exception of agency contract, a legal framework in Portugal and Spain. It has been discussed in literature if agency contract legal framework can be applied, by analogy, to the contracts that fit in the legal category of distribution contracts. This paper aims at analyzing the legal framework of contracts of distribution in these legal systems, with the purpose to discuss the analogical application of the agency contract to these contracts.

  19. NLCD 2001 - Tree Canopy

    Data.gov (United States)

    Minnesota Department of Natural Resources — The National Land Cover Database 2001 tree canopy layer for Minnesota (mapping zones 39-42, 50-51) was produced through a cooperative project conducted by the...

  20. A trace-based model for multiparty contracts

    DEFF Research Database (Denmark)

    Hvitved, Tom; Klaedtke, Felix; Zălinescu, Eugen

    2012-01-01

    In this article we present a model for multiparty contracts in which contract conformance is defned abstractly as a property on traces. A key feature of our model is blame assignment, which means that for a given contract, every breach is attributed to a set of parties. We show that blame...... assignment is compositional by de¿ning contract conjunction and contract disjunction. Moreover, to specify real-world contracts, we introduce the contract speci¿cation language CSL with an operational semantics. We show that each CSL contract has a counterpart in our trace-based model and from...... the operational semantics we derive a run-time monitor. CSL overcomes limitations of previously proposed formalisms for specifying contracts by supporting: (history sensitive and conditional) commitments, parametrised contract templates, relative and absolute temporal constraints, potentially in¿nite contracts...

  1. Environmental report 2001 - Verbund Austria Power Grid

    International Nuclear Information System (INIS)

    2002-01-01

    A balance of the environmental activities performed by Verbund Austria Power Grid during 2001 is presented. It comprises which measures were taken to reach their environmental objectives: certification of an environmental management system according to ISO 14001 and EMAS, environmental protection, policies, water and thermoelectric power generation status ( CO 2 , SO 2 , NO x emission monitoring, energy efficiency, replacement of old equipment), reduction of the greenhouse gases emissions and nature conservation. The report is divided in 8 sections: power grid, environmental policy, environmental management, power grid layout, environmental status of the system, introduction of new technologies for environmental monitoring, environmental objectives 2001 - 2002, and data and facts 2001. (nevyjel)

  2. Progress on the maternal mortality ratio reduction in Wuhan, China in 2001-2012.

    Directory of Open Access Journals (Sweden)

    Shaoping Yang

    Full Text Available BACKGROUND: Most maternal deaths occur in developing countries and most maternal deaths are avoidable. China has made a great effort to reduce MMR by three quarters to meet the fifth Millennium Development Goal (MDG5. METHODS: This retrospective study reviewed and analyzed maternal death data in Wuhan from 2001 to 2012. Joinpoint regression and multivariate Poisson regression was conducted using the log-linear model to measure the association of the number of maternal deaths with time, cause of death, where the death occurred, and cognitive factors including knowledge, attitude, resource, and management stratified. RESULTS: The MMR declined from 33.41 per 100,000 live births in 2001 to 10.63 per 100,000 live births in 2012, with a total decline of 68.18% and an average annual decline of 9.89%. From 2001-2012, the four major causes of maternal death were obstetric hemorrhage (35.16%, pregnancy complications (28.57%, amniotic fluid embolism (16.48% and gestational hypertension (8.79%. Multivariate Poisson regression showed on average the MMR decreased by.17% each year from 2001-2006 and stayed stagnant since 2007-2012. CONCLUSIONS: With the reduction in MMR in obstetric death (e.g. obstetric hemorrhage, there had been a remarkable reduction in MMR in Wuhan in 2001-2012, which may be due to (1 the improvement in the obstetric quality of perinatal care service on prevention and treatment of obstetric hemorrhage and emergency care skills, and (2 the improvement in the maternal health management and quality of prenatal care. Interventions to further reduce the MMR include several efforts such as the following: (1 designing community-based interventions, (2 providing subsidies to rural women and/hospitals for hospital delivery, (3 screening for pregnancy complications, and (4 establishing an emergency rescue system for critically ill pregnant women.

  3. 48 CFR 916.203-4 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 916.203-4 Section 916.203-4 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Fixed-Price Contracts 916.203-4 Contract clauses. (d)(2) The...

  4. 48 CFR 232.501-3 - Contract price.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contract price. 232.501-3... 232.501-3 Contract price. (b) The contracting officer may approve progress payments when the contract price exceeds the funds obligated under the contract, provided the contract limits the Government's...

  5. Copyright Preemption of Contracts

    OpenAIRE

    Bohannan, Christina

    2008-01-01

    This Article argues that both courts and scholars are wrong in their categorical approaches to preemption of contracts under the Copyright Act, and proposes an intermediate approach that recognizes the importance of both contract rights and federal policy in preemption analysis. First, it argues that both courts and scholars have misapplied preemption law to breach of contract claims. Although the two sides tend to favor opposite results, they take equally categorical approaches. Categori...

  6. 48 CFR 39.107 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ..., in solicitations and contracts for information technology which require security of information technology, and/or are for the design, development, or operation of a system of records using commercial... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.107 Contract clause. The contracting officer...

  7. 48 CFR 970.1504 - Contract pricing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract pricing. 970.1504 Section 970.1504 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504 Contract pricing. ...

  8. 48 CFR 747.507 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 747.507 Section 747.507 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 747.507 Contract clauses. Contracting...

  9. 48 CFR 871.212 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 871.212... Rehabilitation and Employment Service 871.212 Contract clauses. Contracting officers must use the following clauses, as appropriate, in solicitations and contracts for vocational rehabilitation and employment...

  10. Nuclear safety in France in 2001

    International Nuclear Information System (INIS)

    2002-01-01

    This press dossier summarizes the highlights of nuclear safety in France in 2001: the point-of-view of A.C. Lacoste, director of the French authority of nuclear safety (ASN), the new organisation of the control of nuclear safety and radiation protection, the ASN's policy of transparency, the evolutions of nuclear fuels and the consistency of the fuel cycle, the necessary evolutions of the nuclear crisis management, the harmonizing work of safety approaches carried out by the WENRA association. The following documents are attached in appendixes: the decrees relative to the reformation of the nuclear control in France, the missions of the ASN, the control of nuclear safety and radiation protection in France, the organization of ASN in March 2000, the incidents notified in 2001, the inspections performed in 2001, and the list of the main French nuclear sites. (J.S.)

  11. Evaluation of the Defense Contract Audit Agency Audit Coverage of Tricare Contracts

    National Research Council Canada - National Science Library

    Brannin, Patricia

    2000-01-01

    Our objective was to evaluate the adequacy of the Defense Contract Audit Agency (DCAA) audit coverage of contracts for health care provided under TRICARE and the former Civilian Health Care and Medical Program of the Uniformed Services...

  12. 29 CFR 4.145 - Extended term contracts.

    Science.gov (United States)

    2010-07-01

    ...'Hara Service Contract Act Changes in Contract Coverage § 4.145 Extended term contracts. (a) Sometimes... purposes of this Act, a contract shall be deemed entered into upon the contract anniversary date which... period is a wholly new contract with respect to application of the Act's provisions and the regulations...

  13. Natalidad y fecundidad, Colombia, 2001

    OpenAIRE

    León A, Alba Luz; Ocampo A, Leidy Johanna; Spath P, Doris Estella; Agudelo G, Héctor Byron; Grisales R, Hugo

    2006-01-01

    Se presenta la natalidad, la fecundidad y los nacimientos vivos en Colombia en el año 2001 con base en la totalidad de los registros de nacidos vivos del Departamento Administrativo Nacional de Estadísticas (dane) (724.236). La población de Colombia, calculada a mitad de período, se dividió en ocho categorías de municipios de acuerdo con el tamaño poblacional, según la Ley 617/2001. No se presentaron diferencias importantes entre las variables afines a las características del recién nacido po...

  14. Distribution of Citations Received by Scientific Papers Published in the Imaging Literature From 2001 to 2010: Decreasing Inequality and Polarization.

    Science.gov (United States)

    Yoon, Soo Jeong; Yoon, Dae Young; Lee, Hyung Jin; Baek, Sora; Lim, Kyoung Ja; Seo, Young Lan; Yun, Eun Joo

    2017-08-01

    The objective of this study was to assess the distribution of citations received by scientific papers published in the imaging literature between 2001 and 2010. We extracted the number of citations of all articles and reviews for 5 years after publication using the Scopus (Elsevier) citation database of imaging journals between 2001 and 2010. We quantitatively analyzed article and review citations from each journal and each year, including the number, proportion, and annual number of citations of the most- (≥ 20 citations) and least-cited (three or fewer citations) papers; ratio of most-cited to least-cited papers; 75/25 percentile citation ratio; 90/10 percentile citation ratio; Gini coefficient; and Kolkata index. Our analysis of 124,331 articles and 13,575 reviews from 121 journals showed that the proportion of most-cited articles (from 19.6% to 27.1%) and reviews (from 19.1% to 37.2%) increased from 2001 to 2010, whereas the proportion of least-cited articles (from 32.3% to 23.0%) and reviews (from 31.9% to 15.8%) declined over the same period. The annual numbers of citations of most-cited articles and reviews both reached a peak in the fourth year after publication, whereas those of least-cited articles and reviews reached a peak in the second and fist years, respectively, after publication and thereafter decreased. The 75/25 percentile ratio for articles declined from 41.1 to 27.5 between 2001 and 2010. Over the same time, the 75/25 percentile ratio for reviews declined from 47.4 to 22.9. The 90/10 percentile ratio for articles declined from 1730.8 to 188.7; for reviews, the 90/10 percentile ratio declined from 5788.0 to 100.7. The Gini coefficient of articles and reviews also declined from 0.6116 to 0.5721 for articles and from 0.6507 to 0.5649 for reviews; the k index, from 0.7260 to 0.7088 for articles from 0.7409 to 0.7072 for reviews. Inequality and polarization of citations consistently decreased in the imaging literature from 2001 to 2010.

  15. Turnkey contracts

    International Nuclear Information System (INIS)

    Langetepe, G.

    1977-01-01

    To make energy available economically and in sufficient quantity is a main point for the future of an industrial and more for a developing country. The investment costs and the availability of a power plant and in particular for a nuclear power plant are the most significant factors in the economic operation of the plant. In the phase before signing the contract the essential decisions are made with high influence in the economic operation and the availability of the plant. A turn-key contract offers good possibilities to minimize the risks referring a) the plant quality and functionality, b) the plant investment cost, c) the plant completion date, d) the handling of the licensing procedures, e) the availability of the operation. The lecture mentions the points which are of high influence for a successful erection and operation period and which must be clarified before signing the contract between the buyer and supplier of the plant. (orig./HP) [de

  16. 48 CFR 745.106 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 745.106 Section 745.106 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 745.106 Contract clauses. (a) The contracting officer shall insert the...

  17. 48 CFR 846.710 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 846.710 Section 846.710 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT QUALITY ASSURANCE Warranties 846.710 Contract clauses. The contracting officer shall insert the clause at...

  18. 48 CFR 833.215 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 833.215 Section 833.215 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 833.215 Contract clause. The contracting...

  19. 48 CFR 947.7002 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 947.7002 Section 947.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT TRANSPORTATION Foreign Travel 947.7002 Contract clause. When foreign travel may be required under the contract...

  20. 48 CFR 432.412 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract clause. 432.412 Section 432.412 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Advance Payments for Non-Commercial Items 432.412 Contract clause. The decision...

  1. Static Verification for Code Contracts

    Science.gov (United States)

    Fähndrich, Manuel

    The Code Contracts project [3] at Microsoft Research enables programmers on the .NET platform to author specifications in existing languages such as C# and VisualBasic. To take advantage of these specifications, we provide tools for documentation generation, runtime contract checking, and static contract verification.

  2. CONSIDERATIONS ON THE RELATIONSHIP BETWEEN THE PROVISIONS OF THE APPLICABLE COLLECTIVE AGREEMENT AND THE INDIVIDUAL LABOR CONTRACT

    Directory of Open Access Journals (Sweden)

    Ana Vidat

    2015-11-01

    Full Text Available It is inconceivable that a contract executed by definition in time, could remain in all respects, in its original form in which the parties have concluded (in writing. Flexicurity requirements during the execution of the individual labour contract is not, in reality, only a requirement of the legislature - which translates options employer organizations - it is an objective necessity determined that occur after the conclusion of the contract a number of circumstances, situations, goals or subjective, requiring modification of.

  3. 48 CFR 16.103 - Negotiating contract type.

    Science.gov (United States)

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Selecting Contract Types 16.103 Negotiating contract... basic profit motive of business enterprise, shall be used when the risk involved is minimal or can be...) Contracts on a firm fixed-price basis other than those for major systems or research and development, and (3...

  4. Manual of contracts for the electricity sector. Contracts that work: Drafting and proper legal application. 2. rev. ed.

    International Nuclear Information System (INIS)

    Schoene, Thomas

    2014-01-01

    This manual deals fundamentally with the drafting of contracts for the electricity sector. It covers all types of contracts on both the customer and the network side with their various special clauses and variants, specifically: basic supply, substitute supply, supply contracts for private, commercial and industrial special customers as well as redistributors, EFET contracts, network access contracts, supplier framework contracts, feed-in contracts, grid connection contracts and connection use contracts. The manual also addresses questions concerning electricity customer insolvency, an issue of growing importance. The following topics are furthermore dealt with in a practically oriented manner and with care being taken to explain the underlying legal issues in readily understandable language. What basic framework conditions are specified by the new energy economy laws and general civil law? What possibilities are available in drafting contracts and what are the ramifications in each case? What subject matters in a contract are of particular economic significance? How can concession contracts be designed in a market-conforming way when there is strong competition for qualified rights of way? What opportunities and risks are associated with innovative products? What options for action does a supplier have in the event of (threatening) customer insolvency? Model contracts from day-to-day management practice and tips, checklists and cautioning notes round off this manual.

  5. The interpretation of administrative contracts

    Directory of Open Access Journals (Sweden)

    Cătălin-Silviu SĂRARU

    2014-06-01

    Full Text Available The article analyzes the principles of interpretation for administrative contracts, in French law and in Romanian law. In the article are highlighted derogations from the rules of contract interpretation in common law. Are examined the exceptions to the principle of good faith, the principle of common intention (willingness of the parties, the principle of good administration, the principle of extensive interpretation of the administrative contract. The article highlights the importance and role of the interpretation in administrative contracts.

  6. Contract types for nuclear power projects, non-turnkey type contracts in particular

    International Nuclear Information System (INIS)

    Nyte'n, T.

    1975-01-01

    A non-turnkey contract differs from a turnkey contract in no special formal way. The way the buyer chooses to exercise his project leadership must be concretized in the contract. The way and extent he wishes to exercise technical checking must be laid down in the form of clear rules. The way information has to flow from one contractor over buyer to others and vice versa has to be laid down in detail and the consequences of non conformance fixed in such a manner that optimum project performance is reached. (orig./FW) [de

  7. 24 CFR 242.52 - Construction contracts.

    Science.gov (United States)

    2010-04-01

    ...; a construction management contract with a guaranteed maximum price, the final costs of which are... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A...

  8. 48 CFR 904.7201 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 904.7201... MATTERS Public Affairs 904.7201 Contract clause. The contracting officer shall insert the clause at 952.204-75, Public Affairs, in solicitations and contracts that require the contractor to release...

  9. Esophageal striated muscle contractions in patients with Chagas' disease and idiopathic achalasia

    Directory of Open Access Journals (Sweden)

    R.O. Dantas

    2002-06-01

    Full Text Available Chagas' disease causes degeneration and reduction of the number of intrinsic neurons of the esophageal myenteric plexus, with consequent absent or partial lower esophageal sphincter relaxation and loss of peristalsis in the esophageal body. The impairment of esophageal motility is seen mainly in the distal smooth muscle region. There is no study about esophageal striated muscle contractions in the disease. In 81 patients with heartburn (44 with esophagitis taken as controls, 51 patients with Chagas' disease (21 with esophageal dilatation and 18 patients with idiopathic achalasia (11 with esophageal dilatation we studied the amplitude, duration and area under the curve of esophageal proximal contractions. Using the manometric method and a continuous perfusion system we measured the esophageal striated muscle contractions 2 to 3 cm below the upper esophageal sphincter after swallows of a 5-ml bolus of water. There was no significant difference in striated muscle contractions between patients with heartburn and esophagitis and patients with heartburn without esophagitis. There was also no significant difference between patients with heartburn younger or older than 50 years or between men and women or in esophageal striated muscle contractions between patients with heartburn and Chagas' disease. The esophageal proximal amplitude of contractions was lower in patients with idiopathic achalasia than in patients with heartburn. In patients with Chagas' disease there was no significant difference between patients with esophageal dilatation and patients with normal esophageal diameter. Esophageal striated muscle contractions in patients with Chagas' disease have the same amplitude and duration as seen in patients with heartburn. Patients with idiopathic achalasia have a lower amplitude of contraction than patients with heartburn.

  10. 2001 annual report

    International Nuclear Information System (INIS)

    2002-01-01

    This reports presents the activities and accomplishments of the Philippine Nuclear Research Institute (PNRI) for the calendar year 2001. The accomplishments of PNRI cited in this report attest to the concerted efforts of the PNRI personnel to harness the unique capabilities and advantages of nuclear science and technology in supporting national development programs

  11. 2001 annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    This reports presents the activities and accomplishments of the Philippine Nuclear Research Institute (PNRI) for the calendar year 2001. The accomplishments of PNRI cited in this report attest to the concerted efforts of the PNRI personnel to harness the unique capabilities and advantages of nuclear science and technology in supporting national development programs.

  12. Exploration update : first half of 2001

    International Nuclear Information System (INIS)

    Harrington, P.

    2001-01-01

    New wells and land sales in the Western Canadian Sedimentary Basin reached record levels during the first half of 2001, but new trends are developing which cast some doubt about the future of exploration activity in the area. The main trend was that product prices softened for both oil and natural gas, with oil prices falling from about $50.00 CDN to $40.00 CDN in the first six months of 2001. The drop in heavy oil prices was even greater in the last quarter of 2000. The heavy oil differential increased from a historical average of $4.00 to $8.00 CDN, up to a record high of $23.52 on October 31, 2000. The differential remained high during the first half of 2001, but showed signs of narrowing late in the first quarter. Heavy oil prices fluctuated between $25.00 and $30.00 CDN during the first six months of 2001. Natural gas prices fell significantly through the first half of 2001. Canadian gas prices are expected to average about $5.00 per Mcf during the next 3 to 5 years until significant new supplies from the high Arctic or the East Coast of Canada can be brought into the marketplace, or until there are readily available supplies of liquefied natural gas from overseas. High prices for oil and natural gas meant high prices for producing property acquisitions. Production in the first quarter of 2001 sold for $44,000/boe/day compared to $28,000 during 2000. The first half of 2001 saw many takeovers as American companies renewed their interest in Canadian oil and gas companies. These included Conoco's purchase of Gulf Canada, Anadarko's takeover of Berkley, Calpine's acquisition of Encal and Prime West's acquisition of Cypress. The affect that these takeovers will have on the ongoing level of exploration in Western Canada is yet to be seen. Drilling activity during the first 6 months of 2001 set new records, as did land sale activity with the most dramatic increases being in British Columbia in the Ojay/Grizzly/Hiding Creek area. Other major land sales included the

  13. Increased muscle glucose uptake during contractions

    DEFF Research Database (Denmark)

    Ploug, Thorkil; Galbo, Henrik; Richter, Erik

    1984-01-01

    We reinvestigated the prevailing concept that muscle contractions only elicit increased muscle glucose uptake in the presence of a so-called "permissive" concentration of insulin (Berger et al., Biochem. J. 146: 231-238, 1975; Vranic and Berger, Diabetes 28: 147-163, 1979). Hindquarters from rats...... in severe ketoacidosis were perfused with a perfusate containing insulin antiserum. After 60 min perfusion, electrical stimulation increased glucose uptake of the contracting muscles fivefold. Also, subsequent contractions increased glucose uptake in hindquarters from nondiabetic rats perfused for 1.5 h......-methylglucose uptake increased during contractions and glucose uptake was negative at rest and zero during contractions. An increase in muscle transport and uptake of glucose during contractions does not require the presence of insulin. Furthermore, glucose transport in contracting muscle may only increase if glycogen...

  14. 48 CFR 803.7001 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 803.7001... Practices 803.7001 Contract clause. The contracting officer shall insert the clause at 852.203-71, Display of Department of Veterans Affairs Hotline poster, in solicitations and contracts expected to equal or...

  15. 48 CFR 819.7009 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 819.7009... Acquisition Program 819.7009 Contract clauses. The contracting officer shall insert VAAR clause 852.219-10... Veteran-Owned Small Business Set-Aside in solicitations and contracts for acquisitions under this subpart. ...

  16. 48 CFR 903.971 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 903.971... Contract clause. The contracting officer shall insert the clause at 952.203-70, Whistleblower Protection for Contractor Employees, in contracts that involve work to be done on behalf of DOE directly related...

  17. 48 CFR 53.111 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contract clause. 53.111... AND FORMS FORMS General 53.111 Contract clause. Contracting officers shall insert the clause at 52.253-1, Computer Generated Forms, in solicitations and contracts that require the contractor to submit...

  18. 48 CFR 811.404 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 811.404... ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Delivery or Performance Schedules 811.404 Contract clause. When delivery is required by or on a particular date for f.o.b. destination contracts, the contracting officer...

  19. 48 CFR 925.7004 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 925.7004... FOREIGN ACQUISITION Acquisition of Nuclear Hot Cell Services 925.7004 Contract clause. The contracting... solicitations and contracts involving nuclear hot cell services. This clause does not flow down to second-tier...

  20. National Land Cover Database 2001 (NLCD01)

    Science.gov (United States)

    LaMotte, Andrew E.

    2016-01-01

    This 30-meter data set represents land use and land cover for the conterminous United States for the 2001 time period. The data have been arranged into four tiles to facilitate timely display and manipulation within a Geographic Information System (see http://water.usgs.gov/GIS/browse/nlcd01-partition.jpg). The National Land Cover Data Set for 2001 was produced through a cooperative project conducted by the Multi-Resolution Land Characteristics (MRLC) Consortium. The MRLC Consortium is a partnership of Federal agencies (http://www.mrlc.gov), consisting of the U.S. Geological Survey (USGS), the National Oceanic and Atmospheric Administration (NOAA), the U.S. Environmental Protection Agency (USEPA), the U.S. Department of Agriculture (USDA), the U.S. Forest Service (USFS), the National Park Service (NPS), the U.S. Fish and Wildlife Service (USFWS), the Bureau of Land Management (BLM), and the USDA Natural Resources Conservation Service (NRCS). One of the primary goals of the project is to generate a current, consistent, seamless, and accurate National Land Cover Database (NLCD) circa 2001 for the United States at medium spatial resolution. For a detailed definition and discussion on MRLC and the NLCD 2001 products, refer to Homer and others (2004), (see: http://www.mrlc.gov/mrlc2k.asp). The NLCD 2001 was created by partitioning the United States into mapping zones. A total of 68 mapping zones (see http://water.usgs.gov/GIS/browse/nlcd01-mappingzones.jpg), were delineated within the conterminous United States based on ecoregion and geographical characteristics, edge-matching features, and the size requirement of Landsat mosaics. Mapping zones encompass the whole or parts of several states. Questions about the NLCD mapping zones can be directed to the NLCD 2001 Land Cover Mapping Team at the USGS/EROS, Sioux Falls, SD (605) 594-6151 or mrlc@usgs.gov.

  1. The New 2001-2002 Term. Supreme Court Roundup.

    Science.gov (United States)

    Williams, Charles F.

    2001-01-01

    Discusses the issues addressed during the 2001-2002 term of the U.S. Supreme Court, which convened on October 1, 2001: (1) school vouchers; (2) affirmative action; (3) online pornography; and (4) the death penalty. (CMK)

  2. IAEA research contracts. Third annual report

    International Nuclear Information System (INIS)

    1963-01-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports in the field of Radioactive waste management and environmental research included are: Research Contract No.20. Studies in the uptake of radioisotopes by edible marine products; Research Contract No. 33, Behaviour of fission products in soil; Research Contract No.100, Ionic interaction near clay surfaces. Reports dealing with Health physics and radiation protection presented are: Research Contract No.14, The effect of radiation on plant cells and its modification with protective substances; Research Contract No.32, Determination of the enrichment factors of calcium isotopes on ion exchange resins and the investigation of the various systems of electrolytic separation; Research Contract No. 53, Selection of sulphydryl compounds for radiation protection, using a new microbiological method; Research Contract No. 79, A study of the uptake of radioactive calcium in the skeleton. Reports related to Radiobiology are: Research Contract No.11, Genetical investigations on the effect of ionizing radiation on human cells

  3. IAEA research contracts. Third annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-04-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports in the field of Radioactive waste management and environmental research included are: Research Contract No.20. Studies in the uptake of radioisotopes by edible marine products; Research Contract No. 33, Behaviour of fission products in soil; Research Contract No.100, Ionic interaction near clay surfaces. Reports dealing with Health physics and radiation protection presented are: Research Contract No.14, The effect of radiation on plant cells and its modification with protective substances; Research Contract No.32, Determination of the enrichment factors of calcium isotopes on ion exchange resins and the investigation of the various systems of electrolytic separation; Research Contract No. 53, Selection of sulphydryl compounds for radiation protection, using a new microbiological method; Research Contract No. 79, A study of the uptake of radioactive calcium in the skeleton. Reports related to Radiobiology are: Research Contract No.11, Genetical investigations on the effect of ionizing radiation on human cells

  4. 48 CFR 1552.217-72 - Option to extend the term of the contract-cost-plus-award-fee contract.

    Science.gov (United States)

    2010-10-01

    ... of the contract-cost-plus-award-fee contract. 1552.217-72 Section 1552.217-72 Federal Acquisition...-award-fee contract. As prescribed in 1517.208(c), insert this contract clause in cost-plus-award-fee... Term of the Contract—Cost-Plus-Award-Fee Contract (APR 1984) (a) The Government has the option to...

  5. 42 CFR 93.204 - Contract.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Contract. 93.204 Section 93.204 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND HEALTH EFFECTS... MISCONDUCT Definitions § 93.204 Contract. Contract means an acquisition instrument awarded under the HHS...

  6. Contract Design: Financial Options and Risk.

    Science.gov (United States)

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Integrated care systems as well as accountable care organisations (ACOs) in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced. When designing healthcare options contractors are faced with a variety of financial options. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the second in a row of three that are all published in this issue and contribute to a specific issue in designing healthcare contracts. The first dealt with the organisation of contracts and information asymmetries, while part 3 concludes with the question of risk management and evaluation. The specific research question of this second article focusses on the financial options and reimbursement schemes that are available to define healthcare contracts. A healthcare contract is a relational contract, which determines the level of reimbursement, the scope of services and the quality between service providers and payers, taking account of the risks relating to population and performance. A relational contract is an agreement based upon assumption of a longer timeframe. A major obstacle to the practical implementation of healthcare contracts is the prognosis of the inflows and outflows due to the actuarial risks of the insured population. Financing conditions and reimbursement arrangements that are based on a prospectively determined fixed price, have a significant drawback: it is very difficult to take the differences in health status and the utilisation of distinct insured clientele

  7. 48 CFR 432.113 - Customary contract financing.

    Science.gov (United States)

    2010-10-01

    ... financing. 432.113 Section 432.113 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 432.113 Customary contract financing. The contracting officer may determine the necessity for customary contract financing. The...

  8. 48 CFR 852.222-70 - Contract Work Hours and Safety Standards Act-nursing home care contract supplement.

    Science.gov (United States)

    2010-10-01

    ... Safety Standards Act-nursing home care contract supplement. 852.222-70 Section 852.222-70 Federal...—nursing home care contract supplement. As prescribed in 822.305, for nursing home care requirements, insert the following clause: Contract Work Hours and Safety Standards Act—Nursing Home Care Contract...

  9. 29 CFR 1926.15 - Relationship to the Service Contract Act; Walsh-Healey Public Contracts Act.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Relationship to the Service Contract Act; Walsh-Healey Public Contracts Act. 1926.15 Section 1926.15 Labor Regulations Relating to Labor (Continued... FOR CONSTRUCTION General Interpretations § 1926.15 Relationship to the Service Contract Act; Walsh...

  10. Contracting between firms: empirical evidence

    NARCIS (Netherlands)

    Iyer, R.; Sautner, Z.

    2014-01-01

    We analyse 185 contracts signed between a buyer and 89 suppliers to test how moral-hazard and hold-up problems affect contract design. Our data allow us to study both static and dynamic effects. If a supplier’s products are more critical to the buyer, contracts contain more clauses that address

  11. 48 CFR 17.204 - Contracts.

    Science.gov (United States)

    2010-10-01

    .... (f) Contracts may express options for increased quantities of supplies or services in terms of (1... identified as the option. (g) Contracts may express extensions of the term of the contract as an amended... on the purchase of additional supplies or services, or the overall duration of the term of the...

  12. 48 CFR 1646.201 - Contract Quality Policy.

    Science.gov (United States)

    2010-10-01

    ... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality... ensure that services acquired under the FEHB contract conform to the contract's quality and audit... assurance program required by the contract and will acknowledge in writing whether or not the system is...

  13. 48 CFR 1515.606-70 - Contracting methods.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contracting methods. 1515... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 1515.606-70 Contracting methods. The Department of Housing and Urban Development-Independent Agencies Appropriation Act...

  14. 48 CFR 842.101 - Contract audit responsibilities.

    Science.gov (United States)

    2010-10-01

    ... CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Audit Services 842.101 Contract audit responsibilities. (a) Contracting officers may use the support services of other agencies to the extent feasible. Examples of such services include: pre-award surveys; quality assurance and technical...

  15. 48 CFR 22.610 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Walsh-Healey Public Contracts Act 22.610... Contracts Act, in solicitations and contracts covered by the Act (see 22.603, 22.604, and 22.605). [61 FR... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract clause. 22.610...

  16. Management of transport and handling contracts

    CERN Document Server

    Rühl, I

    2004-01-01

    This paper shall outline the content, application and management strategies for the various contracts related to transport and handling activities. In total, the two sections Logistics and Handling Maintenance are in charge of 27 (!) contracts ranging from small supply contracts to big industrial support contracts. The activities as well as the contracts can generally be divided into four main topics "Vehicle Fleet Management"; "Supply, Installation and Commissioning of Lifting and Hoisting Equipment"; "Equipment Maintenance" and "Industrial Support for Transport and Handling". Each activity and contract requires different approaches and permanent adaptation to the often changing CERN's requirements. In particular, the management and the difficulties experienced with the contracts E072 "Maintenance of lifting and hoisting equipment", F420 "Supply of seven overhead traveling cranes for LHC" and S090/S103 "Industrial support for transport and handling" will be explained in detail.

  17. Housing and bed and board contract

    Directory of Open Access Journals (Sweden)

    Veselinović Janko

    2011-01-01

    Full Text Available In this work not only legal nature of catering services is analyzed, but also legal position of parties in it. Catering contract (Housing and Bed and Board Contract is unnamed in our country and the main source of law for this contract are business practices and usage. A lot of attention is paid to this question. Lack of legal norms for this area is general characteristic for most of the tourism contracts. In this contract its title is also debatable because term 'catering services' is not usually used in practice. Although this contract is unnamed in Comparative Law ,in tourist more developed countries there are more codified business practices from this area and there is more Case Law. Having in mind development of tourist economy adequate legal conditions in tourism contract are expected.

  18. IAEA research contracts. Second annual report

    International Nuclear Information System (INIS)

    1962-01-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No. 1, Factors controlling the distribution of fission products in the biosphere; Research Contract No. 4, The development of a method of non-destructive analysis to determine the U-235 and Pu content of irradiated fuel elements that are in storage under water and that have been out of the reactor for periods of more than one month; Research Contract No. 5, Non-destructive method for evaluating the U-235 and Pu content of irradiated fuel elements; Research Contract No. 19, Studies of contamination in local marine resources, and more specifically the determination of horizontal and vertical diffusion rates in Suruga Bay; Research Contract No. 22, A study of the uptake, accumulation and loss of radioactive material by marine bacteria; Research Contract No. 26, (a) Red cell life span in patients with congenital or acquired haemolytic anaemia using Cr-51 and pie-operative spleen scanning; (b) The aeriology of tropical iron deficiency anaemia using Fe-59 in

  19. IAEA research contracts. Second annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1962-07-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No. 1, Factors controlling the distribution of fission products in the biosphere; Research Contract No. 4, The development of a method of non-destructive analysis to determine the U-235 and Pu content of irradiated fuel elements that are in storage under water and that have been out of the reactor for periods of more than one month; Research Contract No. 5, Non-destructive method for evaluating the U-235 and Pu content of irradiated fuel elements; Research Contract No. 19, Studies of contamination in local marine resources, and more specifically the determination of horizontal and vertical diffusion rates in Suruga Bay; Research Contract No. 22, A study of the uptake, accumulation and loss of radioactive material by marine bacteria; Research Contract No. 26, (a) Red cell life span in patients with congenital or acquired haemolytic anaemia using Cr-51 and pie-operative spleen scanning; (b) The aeriology of tropical iron deficiency anaemia using Fe-59 in

  20. URGENSI STUDI TENTANG PROCUREMENT CONTRACT

    Directory of Open Access Journals (Sweden)

    Yohanes Sogar Simamora

    2006-01-01

    Full Text Available Contractualization is kind of goverment activity in acquiring goods, services and infrastructure as well. Procurement contract has several important function especially in enhancing economic development in a state. In Indonesia, this kind of contract also has function in empowering micro economic scale. Since the aim of procurement study is to provide equal protection between public fund interest in one hand and privat sector in the other hand, general principle of contract law must be taken into consideration together with transparency as the most important principle in government contract.