WorldWideScience

Sample records for contract foodservice management

  1. Development needs of faculty in foodservice management.

    Science.gov (United States)

    Parham, E S; Benes, B A

    1997-03-01

    To determine the development needs of foodservice management (FSM) faculty originally prepared in other fields. Application of qualitative research methodologies to description and comparison of the perspective of three groups: faculty themselves, leaders in foodservice industry, and educators in advanced-degree programs. Purposive sampling of organization directories was used to recruit faculty members for two surveys (142 and 62 respondents) and four focus groups; 15 representatives from industry, professional organizations, and education (through an advisory committee); and 11 foodservice administration advanced-degree programs (through survey and study of program catalogs). Faculty competencies needed were compared from the three perspectives. Descriptive statistics plus chi 2 determinations were used to make comparisons. All three sources identified needs that could be classified into one of three groups: acquisition of theory, mastery of applications, and personal qualities. Theoretical groundwork needed included food science/quantity food production, financial and personnel management, marketing, customer satisfaction, and use of computer and other technologies. Although only 44% of faculty respondents had advanced degrees in FSM, their graduate study in other areas was applicable in meeting many of the competencies. Almost all faculty had some FSM industry experience-a high priority from all perspectives. Most faculty were involved in development activities and reported success in acquiring knowledge and application competence. The faculty members' lack of identification with FSM and their feelings of isolation were more problematic.

  2. Assessment of a Foodservice Management Sanitation Course.

    Science.gov (United States)

    Cook, Charlotte C.; Casey, Ralph

    1979-01-01

    This study determined the extent to which a course in foodservice sanitation using National Institute for the Foodservice Industry materials affected the postcourse sanitation inspection scores in selected establishments. Both experimental and control establishments had significantly higher inspection scores after the course than they had prior to…

  3. Managerial functions of college and university foodservice managers.

    Science.gov (United States)

    Sultemeier, P M; Gregoire, M B; Spears, M C; Downey, R

    1989-07-01

    This study examined managerial roles in college and university foodservice at three organizational levels. The study population included foodservice managers at National Association of College and University Food Services (NACUFS) member schools with a minimum annual budget of +3 million. The 999 managers from 80 colleges and universities who participated were categorized into three groups: assistant, associate, or director of foodservice; unit manager; and manager reporting to unit manager. They rated 51 activity statements on importance and time demand. Maintaining standards of quality was rated most important and most time demanding by all three groups of managers. Perceived importance and time demand of activities increased as managerial level increased. Activity statements were categorized into Mintzberg's 10 managerial roles. Significant differences in importance and time demand ratings among the three managerial groups were indicated for all 10 roles. However, perceived importance and time demand of roles increased as managerial level increased with two exceptions. Disturbance handler and leader roles were rated more time consuming by lower level managers.

  4. Comparison of foodservice management performance level between dietitians and non-dietitians in senior centers using IPA

    Science.gov (United States)

    Lee, Yun-Kyoung

    2009-01-01

    This study investigated the management importance and performance level of foodservice managers at senior centers. Using the survey, perceived importance and performance levels of seven foodservice management areas were evaluated and analyzed. Data showed the foodservice facilities were being managed by dietitians (61.6%) or non-dietitians (38.9%). The result indicated that overall importance level (3.43) was higher than performance level (3.02) (psenior centers and find out which management area should be concentrated for more effective foodservice management. PMID:20016702

  5. Improving U.S. Navy Foodservice Management Training. Part 1. Evaluation of the Current System

    Science.gov (United States)

    1985-11-01

    were training in communications, culinary arts , how to teach, and how to discipline subordinates. Indicators of Quality of Management FMT members...ashore. The majority in both cases were cooks or storeroom workers (Jacks of the Dust). The average grade afloat was E-3.4, while that ashore was E...Present Foodservice Operation ITEM AFLOAT ASHORE a. Food preparation of USN cooks 4-.69 5.73 b. Supervision from watch captain 4.69 5.56 c

  6. Competencies of foodservice directors/managers required in health care operations.

    Science.gov (United States)

    Yates, S C; Shanklin, C W; Gorman, M A

    1987-12-01

    The purpose of this research was to determine competencies of foodservice directors/managers as required by health care administrators and to ascertain the degree to which dietetic curriculums address those competencies. Validated questionnaires were mailed to a random sample of 376 health care administrators and 154 dietetic educators from various types of educational programs. Each questionnaire included 57 competencies representing the following areas: financial, technical, personnel management, nutrition services, production, and marketing. Health care administrators were asked to rate the degree of importance for each competency. Dietetic educators assessed the degree to which each competency was addressed in their curriculums. Of the 288 returned questionnaires, 243 contained usable data. Health care administrators' mean ratings were compared with dietetic educators' mean ratings. Significant differences were noted in 44 of the 57 competencies. Dietetic educators placed significantly greater emphasis on competencies related to nutrition services and significantly less on financial competencies than did health care administrators. Significant differences also were observed for selected competencies classified as technical and production. Results indicated that dietetic educators must continually evaluate curriculums and respond to the changing needs of the health care industry.

  7. A Survey to Determine if Significant Differences Exist in the Scoring of Select Management Areas for Fast Food and Full Service Restaurant Managers by Two-Year Foodservice Management Students.

    Science.gov (United States)

    Bloom, Thomas A.

    A survey was conducted of students in 77 of the 144 two-year foodservice management programs in the United States to assess their knowledge of and attitudes toward fast food restaurant management as compared to full service restaurant management. A total of 1,403 students from 44 programs responded. Results indicated that the food service…

  8. PROCUREMENT AND CONTRACT MANAGEMENT

    CERN Multimedia

    Training & Development Group; Linda Orr-Easo; Tel. 72460; Nathalie Dumeaux; Tel. 78144

    2001-01-01

    We are pleased to announce the launch of a new training on: Procurement and Contract Management (This seminar will be run by CERN experts in French or in English) Level 1 The aim is to raise awareness of the key issues involved. Date : 8 June 2001 This level is open to everyone. Participants should register via our Web page as soon as possible. Level 2 To develop the skills needed to effectively manage contracts, from the Technical, Commercial and Legal aspects. Dates : Three days, Autumn 2001 This Level is open to those who are/will be more directly responsible for procurement and contract management. Participants should have followed Level 1. For a description of the seminar, please consult:   Level 1: http://training.web.cern.ch/Training/MANCO/P9798/9-cm_e.htm Level 2: http://training.web.cern.ch/Training/MANCO/P9798/9-cm2_e.htm

  9. Practices of Selected Foodservice Establishments in Iloilo City, Philippines

    Directory of Open Access Journals (Sweden)

    Raymund B. Moreno

    2015-02-01

    Full Text Available This study aimed to determine the practices of foodservice establishments in Iloilo City. The subjects of this study were selected foodservice establishments in Iloilo City which were selected purposively. The findings of the study showed that the number of foodservice establishments as respondents was equally divided into fast foods and specialty foodservice establishments in Iloilo City. Majority of the foodservice establishment was located uptown or outside of the City of Iloilo and has operated for more than five years. All specialty establishments have undergone accreditation by the Department of Tourism. Since the foodservice establishments practiced all times the different foodservice practices in purchasing, receiving, storage, inventory and safety it is recommended that the owners and managers should continue to perform the different practices to ensure quality service and satisfaction to the customers. It is recommended that the hotel and restaurant management teachers should disseminate the result of the study through their lecture and discussion so that the students could be aware of the good practices employed in the foodservice establishments and enable them to apply this in their future career as effective and productive foodservice worker. Similar study can be conducted to validate the results of this study using other variables and respondents.

  10. Trends impacting food safety in retail foodservice: implications for dietetics practice.

    Science.gov (United States)

    Sneed, Jeannie; Strohbehn, Catherine H

    2008-07-01

    Food safety in retail foodservice is increasingly important to consumers. Trends that impact food safety concerns include the increasing number of meals eaten away from home, increasing consumer awareness about food safety, an aging population, changes in the foodservice workforce, changing technology in work environments, changes in food procurement, foodservice risk factors, and food defense concerns. Each of these trends has implications for dietetics practice, both in working with consumers and managing foodservice operations.

  11. Getting a taste for food waste: a mixed methods ethnographic study into hospital food waste before patient consumption conducted at three New Zealand foodservice facilities.

    Science.gov (United States)

    Goonan, Sarah; Mirosa, Miranda; Spence, Heather

    2014-01-01

    Foodservice organizations, particularly those in hospitals, are large producers of food waste. To date, research on waste in hospitals has focused primarily on plate waste and the affect of food waste on patient nutrition outcomes. Less focus has been placed on waste generation at the kitchen end of the hospital food system. We used a novel approach to understand reasons for hospital food waste before consumption and offer recommendations on waste minimization within foodservices. A mixed methods ethnographic research approach was adopted. Three New Zealand hospital foodservices were selected as research sites, all of which were contracted to an external foodservice provider. Data collection techniques included document analyses, observations, focus groups with kitchen staff, and one-on-one interviews with managers. Thematic analysis was conducted to generate common themes. Most food waste occurred during service and as a result of overproduction. Attitudes and habits of foodservice personnel were considered influential factors of waste generation. Implications of food waste were perceived differently by different levels of staff. Whereas managers raised discussion from a financial perspective, kitchen staff drew upon social implications. Organizational plans, controls, and use of pre-prepared ingredients assisted in waste minimization. An array of factors influenced waste generation in hospital foodservices. Exploring attitudes and practices of foodservice personnel allowed an understanding of reasons behind hospital food waste and ways in which it could be minimized. This study provides a foundation for further research on sustainable behavior within the wider foodservice sector and dietetics practice. Copyright © 2014 Academy of Nutrition and Dietetics. Published by Elsevier Inc. All rights reserved.

  12. Foodservice channel making strides

    National Research Council Canada - National Science Library

    Jessica Jacobsen

    2011-01-01

    .... According to Chicago-based Technomic Inc's 2011 Top Fast-Casual Chain Restaurant Report, the foodservice segment outpaced the rest of the restaurant industry in 2010, with the top 100 chains growing 6% to nearly $18.9 billion...

  13. Project management plan for Contract Management Information System (CONTRACT)

    Energy Technology Data Exchange (ETDEWEB)

    Severud, K.J.

    1995-01-27

    The office of the Vice President of A/E Construction for ICF Kaiser has requested that OSHA compliance statistics be made available to management for companies subcontracting to the ICF Kaiser Company. In addition, a need to better manage contract administrative data for the Contracts Administration and the Construction Management Projects organizations has been identified. The Contract Management Information System is being developed to achieve these objectives. This document provides a Project Management Plan for development of the Contract Management Administration System (CONTRACT) by Design Services DAD/CAE Support. The Project Management Plan describes the project work breakdown structure, safety and quality considerations, with associated cost, schedule and project management information. The CONTRACT System is intended to aid the ICF Kaiser divisions with tracking of A/E subcontractor information to include general contract administration information used by the Contracts Administration organization, contract and safety performance data used by the Construction Management Projects and office of the organization and Vice President of A/E Construction.

  14. Moderating effects of leader-member exchange (LMX) on job burnout in dietitians and chefs of institutional foodservice

    OpenAIRE

    Lee, Kyung-Eun

    2011-01-01

    The objectives of the study were to investigate job burnout and leader-member exchange (LMX) levels as well as to evaluate buffering effects of LMX on burnout among dietitians and chefs at institutional foodservices. Hypotheses were proposed based on the Job Demands-Resources model and LMX theory. The study population consisted of dietitians and chefs who were in charge of managing unit operations in a nationwide contract management company. Positive/negative affectivity, workload, job burnou...

  15. Improving U.S. Navy Foodservice Management Training. Part 2: Recommendations for Improving On-Site Training Ashore and Afloat

    Science.gov (United States)

    1985-12-01

    Preparation Kitchen Safety: Preventing Machine Injuries Basic Nutrition Food Poisoning - Preventatives MEAN 5.29 5.68 5.01 5.17 MM MÜ ■ttüiüüii...Presentation Creative Cooking Nutrition Baking Accident Prevention MSs CITING (%) 29 26 16 16 16 13 10 1 Percents are based on only the 31 MSs...foodservice training are listed below. Commercial Sources. National Educational Media, Inc., 21601 Devonshire Street, Chatsworth, VA 91311. Culinary

  16. Benchmarking in Foodservice Operations.

    Science.gov (United States)

    1998-06-19

    fifth generation was global benchmarking, which was "a global application where international trade, cultural, and business process distinctions...religious dietary needs of inmates. In the financial area of foodservice, usage offood cost percentage, labor cost percentage, supply cost percentage

  17. Construction contracts law and management

    CERN Document Server

    Hughes, Will; Murdoch, John

    2015-01-01

    The fifth edition of this bestselling textbook has been thoroughly revised to provide the most up-to-date and comprehensive coverage of the legislation, administration and management of construction contracts. It now includes comparisons of working with JCT, NEC3, and FIDIC contracts throughout. Introducing this topic at the core of construction law and management, this book provides students with a one-stop reference on construction contracts. Significant new material covers: procurement tendering developments in dispute settlement commentary on all key legislation, case law and contract amendments In line with new thinking in construction management research, this authoritative guide is essential reading for every construction undergraduate and an extremely useful source of reference for practitioners.

  18. Contract Management: New Pupil Transportation Option.

    Science.gov (United States)

    Couzins, Jerome P.

    1984-01-01

    Using contract management services for their student transportation programs, school districts can maintain local control and accountability, limit administrative costs, improve management continuity, and reduce staff overhead. Competition for contract renewal stimulates service improvement. (MCG)

  19. [Patient safety in management contracts].

    Science.gov (United States)

    Campillo-Artero, C

    2012-01-01

    Patient safety is becoming commonplace in management contracts. Since our experience in patient safety still falls short of other clinical areas, it is advisable to review some of its characteristics in order to improve its inclusion in these contracts. In this paper opinions and recommendations concerning the design and review of contractual clauses on safety are given, as well as reflections drawn from methodological papers and informal opinions of clinicians, who are most familiar with the nuances of safe and unsafe practices. After reviewing some features of these contracts, criteria for prioritizing and including safety objectives and activities in them, and key points for their evaluation are described. The need to replace isolated activities by systemic and multifaceted ones is emphasized. Errors, limitations and improvement opportunities observed when contracts are linked to indicators, information and adverse event reporting systems are analysed. Finally, the influence of the rules of the game, and clinicians behaviour are emphasised. Copyright © 2011 SECA. Published by Elsevier Espana. All rights reserved.

  20. Analysis of the 314th contracting squadrons contract management capability using the Contract Management Maturity Model (CMMM)

    OpenAIRE

    Jackson, Carl J.

    2007-01-01

    MBA Professional Report This research project provides an assessment of the contract management capability of the 314th Contracting Squadron located at Little Rock Air Force Base, Arkansas. The assessment uses a questionnaire covering the six phases of the contract management process. The purpose of this research project is to analyze the 314th Contracting Squadron contracting processes and requirement target areas for improvement efforts by the application of the Contract Management M...

  1. Management of Contracts for F110 Engine Procurements

    National Research Council Canada - National Science Library

    Granetto, Paul

    2001-01-01

    .... The Administrative Contracting Office, Defense Contract Management Agency at the General Electric Aircraft Engine plant in Cincinnati, Ohio, was responsible for contract administration functions after contract award.

  2. Towards Certified Management of Financial Contracts

    DEFF Research Database (Denmark)

    Bahr, Patrick; Berthold, Jost; Elsman, Martin

    2014-01-01

    . The seminal work by Peyton-Jones and Eber on financial contracts shows how an algebraic approach to contract specification can be used for valuation of contracts (when combined with a model of the underlying observables) and for managing how contracts evolve under so-called fixings and decision......-taking, with the contracts eventually evaporating into the empty contract, for which no party have further obligations. The ideas have emerged into Eber's company LexiFi, which has become a leading software provider for a range of financial institutions, with all contract management operations centralised around a domain......Banks and financial institutions nowadays often use domain-specific languages (DSLs) for describing complex financial contracts, in particular, for specifying how asset transfers for a specific contract depend on underlying observables, such as interest rates, currency rates, and stock prices...

  3. Management of transport and handling contracts

    CERN Document Server

    Rühl, I

    2004-01-01

    This paper shall outline the content, application and management strategies for the various contracts related to transport and handling activities. In total, the two sections Logistics and Handling Maintenance are in charge of 27 (!) contracts ranging from small supply contracts to big industrial support contracts. The activities as well as the contracts can generally be divided into four main topics "Vehicle Fleet Management"; "Supply, Installation and Commissioning of Lifting and Hoisting Equipment"; "Equipment Maintenance" and "Industrial Support for Transport and Handling". Each activity and contract requires different approaches and permanent adaptation to the often changing CERN's requirements. In particular, the management and the difficulties experienced with the contracts E072 "Maintenance of lifting and hoisting equipment", F420 "Supply of seven overhead traveling cranes for LHC" and S090/S103 "Industrial support for transport and handling" will be explained in detail.

  4. School Foodservice: The Next Millennium.

    Science.gov (United States)

    Fitzgerald, Patricia L.

    1998-01-01

    Examines trends identified in the American School Food Service Association's research-based "1998-2000 Strategic Plan." Forecasters are projecting that student enrollments will rise over the next five years, labor shortages will continue, competition from fast-food providers is increasing, food-service providers' roles are expanding, and…

  5. Consumer perceptions on sustainable practices implemented in foodservice organizations in Korea.

    Science.gov (United States)

    Ju, Seyoung; Chang, Hyeja

    2016-02-01

    Sustainable practices in foodservice organizations including commercial and noncommercial ones are critical to ensure the protection of the environment for the future. With the rapid growth of the foodservice industry, wiser usage of input sources such as food, utilities, and single use packaging should be reconsidered for future generations. Therefore, this study aims to investigate the customer's perceptions on sustainable practices and to identify the relationship among sustainable practices, social contribution and purchase intention. The study was conducted using content analyses by reviewing articles on sustainable food service practices published domestically and abroad. Thereafter, data were collected with a face-to-face survey using a questionnaire and analyzed with factor analyses and multiple regressions. Sustainable practices classified with factor analysis consisted of 6 dimensions of green food material procurement, sustainable food preparation, green packaging, preservation of energy, waste management, and public relations on green activity, with a total of 25 green activities in foodservice operations. Consumers were not very familiar with the green activities implemented in the foodservice unit, with the lowest awareness of "green food material procurement (2.46 out of 5 points)", and the highest awareness of "green packaging (3.74)" and "waste management (3.28). The factors influencing the perception of social contribution by foodservice organizations among 6 sustainable practice dimensions were found to be public relations on green activity (β = 0.154), waste management (β = 0.204) and sustainable food preparation (β = 0.183). Green packaging (β = 0.107) and the social contribution of the foodservice organization (β = 0.761) had strong relationships with the image of the organization. The purchase intentions of customers was affected only by the foodservice image (β = 0.775). The results of this study suggest that sustainable practices by

  6. OPTIMAL COMPENSATION CONTRACTS FOR OPTIMISTIC MANAGERS

    OpenAIRE

    Immordino, Giovanni; Menichini, Anna Maria C.; Romano, Maria Grazia

    2012-01-01

    We study an employment contract between an (endogenously) optimistic manager and realistic investors. The manager faces a trade-off between ensuring that effort reflects accurate news and savoring emotionally beneficial good news. Investors and manager agree on optimal recollection when the weight the manager attaches to anticipatory utility is small. For intermediate values investors bear an extra-cost to make the manager recall bad news. For large weights investors renou...

  7. Analysis of Naval Facilities Engineering Command's (NAVFAC) Contracting Processes Using the Contract Management Maturity Model (CMMM)

    National Research Council Canada - National Science Library

    Ludwig, Walter S; Moore, Alexander M

    2006-01-01

    .... The purpose of this study is to analyze NAVFAC's contracting processes, establish a baseline for contract management maturity and ethical context, and recommend target areas for improvement efforts...

  8. 77 FR 12336 - Public Availability of Office of Acquisitions and Contract Management FY 2011 Service Contract...

    Science.gov (United States)

    2012-02-29

    ... Availability of Office of Acquisitions and Contract Management FY 2011 Service Contract Inventory AGENCY.... L. 111-117), the Office of Acquisitions and Contract Management is publishing this notice to advise...-guidance-11052010.pdf . The Office of Acquisitions and Contract Management has posted its inventory and a...

  9. 78 FR 12106 - Public Availability of Office of Acquisitions and Contract Management FY 2012 Service Contract...

    Science.gov (United States)

    2013-02-21

    ... Availability of Office of Acquisitions and Contract Management FY 2012 Service Contract Inventory AGENCY: Office of Acquisitions and Contract Management (OACM), Peace Corps. ACTION: Notice of Public Availability... Consolidated Appropriations Act of 2010 (Pub. L. 111-117), the Office of Acquisitions and Contract Management...

  10. Moderating effects of leader-member exchange (LMX) on job burnout in dietitians and chefs of institutional foodservice.

    Science.gov (United States)

    Lee, Kyung-Eun

    2011-02-01

    The objectives of the study were to investigate job burnout and leader-member exchange (LMX) levels as well as to evaluate buffering effects of LMX on burnout among dietitians and chefs at institutional foodservices. Hypotheses were proposed based on the Job Demands-Resources model and LMX theory. The study population consisted of dietitians and chefs who were in charge of managing unit operations in a nationwide contract management company. Positive/negative affectivity, workload, job burnout, and LMX scales that had been validated in previous research were adopted. A total of 552 questionnaires were distributed and 154 responses were returned. Results indicated that respondents' burnout levels were moderate and emotional exhaustion was greater than cynicism. In terms of LMX, the surveyed dietitians and chefs showed higher respect toward their supervisors than loyalty. When positive affectivity and negative affectivity were controlled, workload influenced emotional exhaustion and professional efficacy significantly. With affectivity and workload controlled, however, LMX did not influence any dimensions of burnout. The moderating effect of LMX on the relationship between workload and cynicism was significant. That is, the effect of workload on cynicism was weak if the dietitians and chefs perceived the relationship with their supervisor positively. Based on the findings and literature reviewed, how to mitigate job burnout among foodservice managers is discussed.

  11. Financial Management: Reopening of Contracts in the Mechanization of Contract Administration Services System

    National Research Council Canada - National Science Library

    Granetto, Paul

    2003-01-01

    .... In anticipation of transitioning to the new contract payment system, the Defense Finance and Accounting Service and the Defense Contract Management Agency were attempting to close out as many contracts as possible...

  12. 48 CFR 2452.242-71 - Contract management system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract management system... 2452.242-71 Contract management system. As prescribed in 2442.1107, insert the following clause: Contract Management System (FEB 2006) (a) The contractor shall use contract management baseline planning...

  13. Quality, efficiency, and sustainability in the foodservice supply chain

    DEFF Research Database (Denmark)

    Wang, Yang; Grunow, Martin

    Consumers have become more and more demanding with regards to food quality, food safety, sustainability, and associated product attributes. Looking at food supply chains from an integrated point of view has therefore become an industry paradigm. The overall aim of this thesis is to contribute...... to the literature with regards to the development of efficient, high-quality, and sustainable food supply chains; especially focusing on integrated methodologies. In this thesis, research is presented on the inclusion of the specifics of the food industry, food engineering related knowledge, and sustainability...... assessment methodology into food supply chain management. This thesis builds on a case from the foodservice industry, which is used throughout the thesis to illustrate the proposed methodologies. As an important part of the food industry, the foodservice industry connects agricultural producers, food...

  14. Emergency preparedness needs assessment of centralized school foodservice and warehousing operations.

    Science.gov (United States)

    Story, Cyndie; Sneed, Jeannie; Oakley, Charlotte B; Stretch, Theresa

    2007-12-01

    Managers of onsite retail foodservice operations, particularly those in centralized school foodservice operations, are called on to provide meals during emergencies, yet there is a paucity of research on their readiness to handle emergencies. Qualitative research and a cross-sectional survey design were used to conduct a needs assessment for emergency preparedness (emergency readiness, food recalls, and food defense) in centralized school foodservice operations, including warehousing. An open-ended written questionnaire was mailed to eight foodservice directors, and responses were used to develop a written questionnaire that was mailed to school foodservice directors in 200 districts identified as having centralized food production and warehousing. Directors from 78 districts responded (39% response rate). Most districts (n=72) had an emergency response team, and foodservice was included as part of 63 of those teams. Not all districts had written procedures for food recalls (47 of 73), natural disasters (37 of 74), or food defense (30 of 74). Barriers to implementing emergency preparedness policies and procedures included limited money, emergency equipment, and time. Most current training related to food safety with little training related to emergency preparedness. Training on the emergency preparedness plan was done in 61 of 78 districts. Training on emergency procedures was done by less than half of the districts during the previous year. This study identified best practices related to emergency preparedness that can be implemented in onsite retail foodservice operations. Results indicate a need to emphasize emergency preparedness, develop written standard operating procedures, and train employees to be prepared to respond to emergencies.

  15. POLizied e-Learning Using Contract Management

    Science.gov (United States)

    Espinosa, Espinosa David; Noguez, Julieta; Benes, Bedrich; Bueno, Abel

    2005-01-01

    We present an innovative way to manage online learning by administering experiential learning activities during a semester-long, web-based course that is designed with the Project Oriented Learning methodology. A consulting-style guiding thread for in-class and remote workshops is implemented using a professionally relevant project contract that…

  16. 77 FR 47514 - Management Contracts-Background Investigations

    Science.gov (United States)

    2012-08-09

    ... National Indian Gaming Commission 25 CFR Part 537 Management Contracts--Background Investigations AGENCY..., a management contract, and to update the forms of payment that may be accepted by the NIGC for... management responsibility for, a management contract for class II gaming, and in the case of a corporation...

  17. Associations among School Characteristics and Foodservice Practices in a Nationally Representative Sample of U.S. Schools

    Science.gov (United States)

    Thomson, Jessica L.; Tussing-Humphreys, Lisa M.; Martin, Corby K.; LeBlanc, Monique M.; Onufrak, Stephen J.

    2012-01-01

    Objective Determine school characteristics associated with healthy/unhealthy foodservice offerings or healthy food preparation practices. Design Retrospective analysis of cross-sectional data. Setting Nationally representative sample of public and private elementary, middle and high schools. Participants 526 and 520 schools with valid data from the 2006 School Health Policies and Practices Study (SHPPS) Food Service School Questionnaire. Main Outcome Measure(s) Scores for healthy/unhealthy foodservice offerings and healthy food preparation practices. Analysis Multivariable regression to determine significant associations among school characteristics and offerings/preparation practices. Results Public schools and schools participating in USDA Team Nutrition reported more healthy offerings and preparation than private or non-participating schools, respectively. Elementary schools reported less unhealthy offerings than middle or high schools; middle schools reported less unhealthy offerings than high schools. Schools requiring foodservice managers to have a college education reported more healthy preparation while those requiring completion of a foodservice training program reported less unhealthy offerings and more healthy preparation than schools without these requirements. Conclusions and Implications Results suggest the school nutrition environment may be improved by requiring foodservice managers to hold a nutrition-related college degree and/or successfully pass a foodservice training program, and by participating in a school-based nutrition program, such as USDA Team Nutrition. PMID:22963956

  18. 76 FR 79565 - Management Contracts-Background Investigations

    Science.gov (United States)

    2011-12-22

    ... National Indian Gaming Commission 25 CFR Part 537 RIN 3141-AA46 Management Contracts--Background... management contracts. The proposed revision may reduce duplication of efforts while maintaining the integrity... contractor should be required to submit background information when the contract is for management of both...

  19. Multiple Challenges of Flexible Workforce Management: the contract managers experience

    Directory of Open Access Journals (Sweden)

    Yana Torres de Magalhães

    2010-07-01

    Full Text Available This article presents the results of a survey that had the purpose to evaluate the human resources (HR practices adopted by a Brazilian industrial corporation from the viewpoint of contracting out managers to deal with four flexible workforce management challenges: qualification; quality; commitment; standardization of outsourcing services. These HR practices are still little discussed by scholars. So, this is the main contribution of this article. It is also virtually nonexistent in the literature studies that encompass analysis about HR practices to deal with major challenges of outsourcing throughout the viewpoint of contracting out managers. We performed 15 semi-structured interviews with contracting out managers. It was also performed a documental analysis about the rules of outsourcing practices of the corporation. We found management practices to deal with each of the four challenges presented. The management of contracts and the provision of training programs were the most prominent of the related practices. The results show that Brazillian labor laws contribute to the segregation of temporary workers, because the companies avoid a more direct relationship fearing legal constraints. Although several efforts were put to improve the work conditions of the flexible workforce, these workers are still stigmatized, seen and treated as less important than direct employers; this causes negative impacts on commitment. The decision to use flexible workforce by companies is still mainly due to cost savings. Therefore, there is still a long way to improve HR practices related to temporary workers in order to avoid losses for all the social actors envolved.

  20. Current and future practices in hospital foodservice.

    Science.gov (United States)

    Silverman, M R; Gregoire, M B; Lafferty, L J; Dowling, R A

    2000-01-01

    To identify current operational practices and expectations for future practices in hospital foodservice; establish the probability that current practices will change; and determine whether differences in practices exist on the basis of profit status and hospital size. A questionnaire, to determine current practices, probability of change, and expectations for future practices, was mailed to foodservice directors. A random sample of 500 foodservice directors in US hospitals with 200 or more beds. A total of 214 questionnaires were returned for a response rate of 43%. Descriptive statistics were used to report current practices, probability of change, and expectations for future practices. The Kruskal-Wallis test was conducted to examine whether the probability of change ratings differed on the basis of hospital profit status and size. chi 2 Analysis was used to examine whether expectations for future practices differed based on hospital profit status and size. Currently 81% of hospital foodservice departments have fewer than 100 employees; 73% have revenue budgets of less than $2 million; 49% have expense budgets greater than $2 million; 55% use a selective menu, often (43%) 1-week in length; 74% use conventional food production technology; 81% have a centralized, hot tray line; 91% operate a cafeteria; 96% do on-site catering; 69% have differential pricing for employee meals; 58% have subsidized employee meals; and 19% have coffee kiosks. Changes in current practices are expected in several areas. Foodservice directors expect to serve meals to fewer inpatients (71%), employ less staff (73%), have smaller expense budgets (70%), and generate more revenue (61%). Kruskal-Wallis and chi 2 analyses indicated few differences on the basis of hospital profit status and size. There was little consensus among directors on how to best respond to these environmental changes. Hospital foodservice practices will change in the future. Foodservice directors are using a variety of

  1. Assessment of Army Contracting Command’s Contract Management Processes

    Science.gov (United States)

    2010-06-16

    D. M., Clouse, A., & Turner, R. (2001). CMMI , distilled. Boston: Addison- Wesley. Army Aviation and Missile Command (AMCOM)(2009). AMCOM Fact Sheet...organizational culture at naval air systems command (Master’s Thesis ). Monterey, CA: Naval Postgraduate School. Kraljic, P. (1983, September...J. (2008, January). Analysis of the contracting processes and ethical culture at Ogden Air Logistics Center, Hill AFB, UT (Master’s Thesis

  2. Contract Management Process Maturity: Analysis of Recent Organizational Assessments

    OpenAIRE

    Rendon, Rene G.

    2009-01-01

    Proceedings Paper (for Acquisition Research Program) Approved for public release; distribution unlimited. This research builds upon the emerging body of knowledge on organizational assessments of contract management processes. Since the development of the Contract Management Maturity Modelユ_ᄅ in 2003, several DoD, Air Force, Navy, Army, and defense contractor organizations have undergone contract management process assessments as a part of their process-improvement effort. The assessm...

  3. High Water Marks in Hedge Fund Management Contracts

    OpenAIRE

    Sevostiyanova, Margarita

    2012-01-01

    The thesis provides a theoretical rationale for the inclusion of high water mark (HWM) provisions in hedge fund management contracts. The results show (i) fund managers with better information about future fund profitability, have more incentives to efficiently close the fund it contracts include HWMs. (ii) Contracts with HWMs cause fund managers to smooth performance. HWMs provide both the incentive to underreport returns in good times as well as to overreport returns during difficult periods.

  4. Measuring Satisfaction in the Program Manager, Procuring Contracting Officer Relationship

    Science.gov (United States)

    1997-12-01

    Contracting Officer) and one of her customers (a U. S. Navy Program Manager ). From an examination of this relationship , the most appropriate criteria... Customer Satisfaction, Performance Measurement, Metrics, Contracting, Program Management 17. SECURITY CLASSIFICATION OF REPORT Unclassified...methodology for developing an instrument to measure the satisfaction of their customers , Navy Program Managers . The purpose of this thesis was to develop

  5. Dynamic contracting mechanism for pavement maintenance management

    NARCIS (Netherlands)

    Demirel, H.C.; De Ridder, H.A.J.

    2013-01-01

    Technological advances, financial possibilities and changes of demands have increasingly affected the pavement maintenance environment for outsourcing in recent years. This induces complexity in the contracting methods of pavement maintenance activities. Despite the fact that current contracting

  6. Measuring Satisfaction in the Program Manager, Procuring Contracting Officer Relationship

    National Research Council Canada - National Science Library

    Gray, John

    1997-01-01

    .... To comply with this Executive Order, Navy contracting offices require an effective methodology for developing an instrument to measure the satisfaction of their customers, Navy Program Managers...

  7. Managing the financial cost of exception to contracting standards

    DEFF Research Database (Denmark)

    Henschel, Rene Franz

    2008-01-01

    In managing financial cost of exception to contracting standards, the first step is to put up an intelligent contract standards exception monitoring system The next step is to maintain tailor-made, fair and transparent contracting standards The third step is to eliminate unnecessary information...... and repetitiveness in contracting standards The fourth step is to enable your organization and the customers or suppliers to handle the necessary exceptions themselves Finally you should consider the use of independent contracting standards and elimination of your own standards as a tool in managing the cost...

  8. Hazard Analysis and Critical Control Point Program for Foodservice Establishments.

    Science.gov (United States)

    Control Point ( HACCP ) inspections in foodservice operations throughout the state. The HACCP system, which first emerged in the late 1960s, is a rational...has been adopted for use in the foodservice industry. The HACCP system consists of three main components which are the: (1) Assessment of the hazards...operations. This manual was developed to assist local sanitarians in conducting HACCP inspections and in educating foodservice operators and employees

  9. Project Hanford management contract quality improvement project management plan

    Energy Technology Data Exchange (ETDEWEB)

    ADAMS, D.E.

    1999-03-25

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

  10. Contract Management Mentality--Are You Ready for the Spotlight?

    Science.gov (United States)

    Whiddon, Philip

    1994-01-01

    Contract management of school maintenance and operations is a growing trend. In-house departments need to be prepared to justify their positions. Describes a Texas school district's request for proposal for contract management and includes the specifications for bidding with comments about the wording of the document. (MLF)

  11. An Evaluation System for Foodservice Equipment

    Science.gov (United States)

    1985-10-01

    Saws Vertical Food Mixers Pressure Cookers Steam Jacketed Kettles Fundamentals of Steam Procedures to Clean Coffee Urns A List of Foodservice...Evaluation System for Pressure Cookers 90 Evaluation Form for Pressure Cookers 92 Pressure Cooker Evaluation Form Guide 93 Evaluation System for Steam...cleaned. Other tasks include maintenance of the gas jets , thermostat calibration, and cleaning of under burner area. Compare manufacture requirements

  12. Development of Career Progression Systems for Employees in the Foodservice Industry. Final Report.

    Science.gov (United States)

    National Restaurant Association, Chicago, IL.

    Firms representing four segments of the foodservice industry (institutional foodservice (9 jobs), commercial restaurants (19 jobs), hotel foodservice (100 jobs), and airline foodservice (10 jobs), participated in a career and training study to test the feasibility of designing and implementing career progression (c.p.) systems within these…

  13. Insurance Contract Analysis for Company Decision Support in Acquisition Management

    Science.gov (United States)

    Chernovita, H. P.; Manongga, D.; Iriani, A.

    2017-01-01

    One of company activities to retain their business is marketing the products which include in acquisition management to get new customers. Insurance contract analysis using ID3 to produce decision tree and rules to be decision support for the insurance company. The decision tree shows 13 rules that lead to contract termination claim. This could be a guide for the insurance company in acquisition management to prevent contract binding with these contract condition because it has a big chance for the customer to terminate their insurance contract before its expired date. As the result, there are several strong points that could be the determinant of contract termination such as: 1) customer age whether too young or too old, 2) long insurance period (above 10 years), 3) big insurance amount, 4) big amount of premium charges, and 5) payment method.

  14. Labor Productivity Standards in Texas School Foodservice Operations

    Science.gov (United States)

    Sherrin, A. Rachelle; Bednar, Carolyn; Kwon, Junehee

    2009-01-01

    Purpose: Purpose of this research was to investigate utilization of labor productivity standards and variables that affect productivity in Texas school foodservice operations. Methods: A questionnaire was developed, validated, and pilot tested, then mailed to 200 randomly selected Texas school foodservice directors. Descriptive statistics for…

  15. Managing the relational character of public-private partnership contracts

    Directory of Open Access Journals (Sweden)

    Cvetković Predrag

    2015-01-01

    Full Text Available A public-private partnership contract has the character of a relational contract. Relational contracts are incomplete agreements governing transactions where the contracting parties have mutually agreed that it is impossible or economically inefficient to contractually define ex ante possible difficulties and contingencies in the contract implementation, nor the difficulties and contingencies underlying the ex post control of contract performance by a third entity (court or arbitration. Considering the methodology of managing relational contracts, it is essential that the theory of relational contracts does not advocate for the establishment of relational contracts as a separate category of contracts, with specifically designated contractual instruments. This theory defines the relational contract as a category which legitimizes 'the relational mode' of a particular contract. The methodology of relational contracts is important for contracts on public-private partnership as it ensures that the contractual relationship is aligned with the changes in the immediate environment where the PPP contract operates. The aforementioned alignment has two aspects. The first one is the ex ante aspect of the alignment which is primarily aimed at preventing the detrimental effect of such alignment to the public partner's interests. Therefore, the intent to prevent such an effect shall be taken into account when defining the criteria for the selection of the most favorable private partner and the best offer. At the same time, it is essential to establish verifiable standards for measuring the private partner performance in the phase of contract implementation. For this goal to be achieved, it is crucial to specify the subject matter of the private partner's obligations, to establish the priority rank of PPP project objectives, to elaborate on the specific requirements governing the eligibility of private partners to participate in the bidding process, to specify

  16. Contractions

    Science.gov (United States)

    ... body for labor and delivery. Labor contractions signal the beginning of childbirth. What causes contractions? Braxton-Hicks (false ... of your last menstrual period.) Labor contractions signal the beginning of childbirth. These contractions come at regular intervals, ...

  17. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Science.gov (United States)

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  18. Management of Contract Waivers and Deviations for Defense Systems

    National Research Council Canada - National Science Library

    1998-01-01

    This report is the fourth and final in a series of reports resulting from our audit of management of contract waivers and deviations for Defense systems and summarizes our overall evaluation. Report...

  19. Notification: Review of the Contract Management Assessment Program

    Science.gov (United States)

    Project #OA-FY14-0034, October 30, 2013. The Office of Inspector General plans to begin the preliminary research phase of an audit evaluating the Office of Acquisition Management’s Contract Management Assessment Program (CMAP).

  20. Privacy Impact Assessment for the Integrated Contracts Management System

    Science.gov (United States)

    The Integrated Contracts Management System collects contact information and other Personally Identifiable Information (PII). Learn how this data will be collected in the system, how it will be used, access to the data, and the purpose of data collection.

  1. Organization and management of the LHC civil-engineering contracts

    CERN Document Server

    Watson, T

    1999-01-01

    Since July 1994, the CERN Civil Engineering group within the ST division has been preparing and engaging contracts related to the Large Hadron Collider (LHC) project. Several of these contracts have values in excess of 10 MCHF and will be executed over a number of years; as such they represent an important part of the infrastructure works required for the LHC. To date, in excess of two hundred and fifty companies have been consulted in relation to these contracts. Contracts or orders have been placed with over thirty companies or joint ventures of companies from nearly all the CERN Member States. This paper aims to show the inter-relationships between these contracts and how the Civil Engineering group is carrying out the management of these important LHC contracts. The organization of the group will be explained along with the roles of individual members within the group.

  2. Contract en conflict : Strategisch Management van Inkooptransacties

    NARCIS (Netherlands)

    Rooks, Gerrit

    2002-01-01

    Dissertation of the University of Utrecht The reality of business relations is opposed to the assumptions commonly held by legal experts on the role of contract law in society, or so Macaulay (see his classic 1963 study) would have us believe. Empirical studies Macaulay conducted in the United

  3. Financial Management: Contracts Classified as Unreconcilable by the Defense Finance and Accounting Service Columbus (Contract DAAA09-81-G-2008-0031)

    National Research Council Canada - National Science Library

    Granetto, Paul J; Kornides, James L; Issel, John K; Knight, Clarence E., III; Frawley, John; Bennett, Karen M

    2005-01-01

    .... Defense Contract Management Agency (DCMA), Pittsburgh, Pennsylvania, personnel stated that the former Defense Contract Administration Services Region Philadelphia initially paid the contract until the payment function was transferred...

  4. Contracting for Management: Assessing Management Capacity under Alternative Service Delivery Arrangements

    Science.gov (United States)

    Brown, Trevor; Potoski, Matt

    2006-01-01

    Contracting critics suggest that when governments outsource, they reduce their capacity to produce services and manage service delivery. In this paper, we decompose the service delivery decision into service production and service management components. When governments contract for service production, they may also choose to contract for a…

  5. State of the art in marketing hospital foodservice departments.

    Science.gov (United States)

    Pickens, C W; Shanklin, C W

    1985-11-01

    The purposes of this study were to identify the state of the art relative to the utilization of marketing techniques within hospital foodservice departments throughout the United States and to determine whether any relationships existed between the degree of utilization of marketing techniques and selected demographic characteristics of the foodservice administrators and/or operations. A validated questionnaire was mailed to 600 randomly selected hospital foodservice administrators requesting information related to marketing in their facilities. Forty-five percent of the questionnaires were returned and analyzed for frequency of response and significant relationship between variables. Chi-square was used for nominal data and Spearman rho for ranked data. Approximately 73% of the foodservice administrators stated that marketing was extremely important in the success of a hospital foodservice department. Respondents (79%) further indicated that marketing had become more important in their departments in the past 2 years. Departmental records, professional journals, foodservice suppliers, observation, and surveys were the sources most often used to obtain marketing data, a responsibility generally assumed by the foodservice director (86.2%). Merchandising, public relations, and word-of-mouth reputation were regarded as the most important aspects of marketing. Increased sales, participation, good will, departmental recognition, and employee satisfaction were used most frequently to evaluate the success of implemented marketing techniques. Marketing audits as a means of evaluating the success of marketing were used to a limited extent by the respondents.

  6. Are registered dietitians adequately prepared to be hospital foodservice directors?

    Science.gov (United States)

    Gregoire, Mary B; Sames, Karoline; Dowling, Rebecca A; Lafferty, Linda J

    2005-08-01

    To determine perceived importance of selected competencies for the role of hospital foodservice director and explore whether registered dietitians (RDs) are perceived competent in these areas. Data were collected through a mailed questionnaire. A random sample of 500 hospital foodservice directors and 500 hospital executives to whom the directors report. Chi2, Mann-Whitney, and Kruskall-Wallis tests were used to examine differences among ratings by and demographic characteristics of foodservice directors and the executives with whom they work. All competencies were perceived to be important for someone in the role of hospital foodservice director. RDs were perceived to be somewhat competent in all areas studied but were only perceived to be competent to expert in a few of the areas. Directors who were RDs and hospital executives who had worked with RDs rated the competence level of RDs higher than did non-RD directors and hospital executives who had not worked with RDs. Unique competencies appear to be important for those aspiring to become hospital foodservice directors. Hospital executives who had worked with RDs perceived the competency level of RDs to be higher than did executives who had not worked with RDs. Often, areas rated as most important for the role of hospital foodservice director were not areas in which RDs were perceived to be highly competent. Additional competency development may be needed to better prepare RDs to assume the role of hospital foodservice director.

  7. 14 CFR 91.1003 - Management contract between owner and program manager.

    Science.gov (United States)

    2010-01-01

    ... RULES Fractional Ownership Operations § 91.1003 Management contract between owner and program manager... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Management contract between owner and program manager. 91.1003 Section 91.1003 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT...

  8. [Contracts including performance and management of uncertainty].

    Science.gov (United States)

    Duru, G; Garassus, P; Auray, J-P

    2013-09-01

    Since many decades in France, the most important part of ambulatory health care expenditure is represented by drug consumption. By the fact, French patient is indeed the greatest world consumer of pharmaceuticals treatments. Therefore, the regulation authorities by successive strategies, attempt to limit or even restrict market access for new drugs in the health care sector secured by public social insurance coverage. Common objectives are to assess the reimbursement to scientific studies and to fix the price of therapeutics at an acceptable level for both industries and government. New trends try then to determine recently the drug price in a dual approach, as a component of global and effective contract, including performance and outcome. The first diffusion authorization is diffusion concerned, but this concept takes into account the eventual success of new produces in long-term survey. Signed for a fixed period as reciprocal partnership between regulation authorities and pharmaceutics industries, the contract integrates two dimensions of incertitude. The first one is represented by the strategy of new treatments development according to efficacy and adapted price, and the second one is linked to the result of diffusion and determines adapted rules if eventual non-respects of the previous engagement are registered. This paper discusses problems related to this new dimension of incertitude affected by conditional drug prices in market access strategy and the adapted follow-up of new treatment diffusion fixed by "outcome" contract between French regulation administration and pharmaceutics industries in our recent economic context. Copyright © 2013 Elsevier Masson SAS. All rights reserved.

  9. Contracting for services and limits to managed competition.

    Science.gov (United States)

    Brookfield, D

    1994-01-01

    The introduction of market forces into the NHS has led to an operational divorce between health care providers and those who need health-care. Central to this change has been the widespread use of contracts. As a management problem, contract negotiation must incorporate consideration of full cost recovery to establish prices for hospital services sold and to ensure that available information is employed in assessing external services purchased. Ignoring the important issue of information availability in identifying relevant costs, it is the difficulty in specifying the cost of an episode of treatment, for example, that has led to contracts being negotiated in block form. Argues that this may be the only contract that can be effectively established. An important consequence of this is that the complexity of hospital services and requirements will work against a wider implementation of piecemeal managed competition and will form a natural barrier to market forces in the NHS.

  10. Pharmacy management company-negotiated contract for drug information services.

    Science.gov (United States)

    Forrester, L P; Scoggin, J A; Della Valle, R

    1995-05-15

    University-based drug information services provided on a contractual basis to the pharmacies of a pharmacy management company are described. Allied Pharmacy Management, Inc. (APM), the manager of 34 institutional pharmacies, 3 community pharmacies, and 6 long-term-care and infusion therapy pharmacies, determined a need to contract for the services of a drug information center. Centers meeting basic criteria were invited to submit proposals. After careful research and negotiations, APM chose the University of Tennessee Drug Information Center for a one-year contract beginning in November 1992. Services provided under the contract include drug information consultations, formulary drug class reviews, new drug monographs, drug-use evaluation (DUE) criteria, literature reviews, and newsletters. Seven months after the contract went into effect, APM-affiliated pharmacy directors stated that they were either satisfied or very satisfied with the quality of the answers to drug information requests, the newsletters, and the drug monographs and agreed overwhelmingly that the contract should be renewed. The contract has been renewed for second and third years. During the first year, the drug information center answered 155 questions and took 121 hours to do so. In the second year there were 244 questions, requiring 161 hours. In year 1 there were 21 formulary class reviews, 6 newsletters, 5 new drug monographs, and 1 set of DUE criteria. There have been 20-25 literature searches during each contract year. The drug information services provided by a university-based drug information center under contract with a pharmacy management company satisfied the directors of the affiliated pharmacies.

  11. Mission and Installation Contracting Command Services Acquisition: Empirical Analysis of Army Service Contract Management Practices

    OpenAIRE

    Michelle Ramos; Joshua Nabors

    2011-01-01

    Sponsored Report (for Acquisition Research Program) The overall purpose of this research is to develop a comprehensive understanding of how the Army Mission and Installation Contracting Command (MICC) manages the acquisition of services. The specific objective of the project is to build on the understanding developed in prior research projects and to identify the factors that promote or obstruct the use of best practices in acquisition management and influence the efficiency and effective...

  12. Contracts for Cross-Organizational Workflow Management

    NARCIS (Netherlands)

    Koetsier, M.J.; Grefen, P.W.P.J.; Vonk, J.; Bauknecht, K.; Kumar Madria, S.; Pernul, G.

    Nowadays, many organizations form dynamic partnerships to deal effectively with market requirements. As companies use automated workflow management systems (WFMSs) to control their processes, a way of linking workflow processes in different organizations is required for turning the cooperating

  13. R and D contract management systems in the USA (Attachment); Beikoku ni okeru R and D contract kanri system (tenpu shiryohen)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    Presented herein is the attachment for 'R and D contract management systems in the USA'. The major contents include regulations governing the R and D contracts, procedures for the R and D contracts, financial procedures for the R and D contracts, procedures for the alternative R and D contracts, financial management of the R and D contracts, and activities for the management of the contract processes by electronic systems. (NEDO)

  14. Incentive Contracting For Venture Capital Fund Managers

    Science.gov (United States)

    Leisen, Dietmar P. J.

    2009-09-01

    It is well-known in the VC literature that VCs should provide so-called value-adding activities that nurture their venture companies. This paper presents a model of the VC market that takes account of the so-called carried interest on the choice of the risk level and actions. We determine the optimal actions of the fund managers and what would be the desired actions of the fund's investors. Conflicts of interest between the parties will be documented.

  15. Contract management process maturity: empirical analysis of organizational assessments / by Rene G. Rendon.

    OpenAIRE

    Rendon, Rene G.

    2009-01-01

    This research builds upon the emerging body of knowledge on organizational assessments of contract management processes. Since the development of the Contract Management Maturity Model in 2003, several DoD, Air Force, Navy, Army, and defense contractor organizations have undergone contract management process assessments as a part of their process-improvement effort. The assessments were conducted using the Contract Management Maturity Model (CMMM) as the initial step in a program of contract ...

  16. Government conceptual estimating for contracting and management

    Science.gov (United States)

    Brown, J. A.

    1986-01-01

    The use of the Aerospace Price Book, a cost index, and conceptual cost estimating for cost-effective design and construction of space facilities is discussed. The price book consists of over 200 commonly used conceptual elements and 100 systems summaries of projects such as launch pads, processing facilities, and air locks. The cost index is composed of three divisions: (1) bid summaries of major Shuttle projects, (2) budget cost data sheets, and (3) cost management summaries; each of these divisions is described. Conceptual estimates of facilities and ground support equipment are required to provide the most probable project cost for budget, funding, and project approval purposes. Similar buildings, systems, and elements already designed are located in the cost index in order to make the best rough order of magnitude conceptual estimates for development of Space Shuttle facilities. An example displaying the applicability of the conceptual cost estimating procedure for the development of the KSC facilities is presented.

  17. The design of optimal electric power demand management contracts

    Science.gov (United States)

    Fahrioglu, Murat

    1999-11-01

    Our society derives a quantifiable benefit from electric power. In particular, forced outages or blackouts have enormous consequences on society, one of which is loss of economic surplus. Electric utilities try to provide reliable supply of electric power to their customers. Maximum customer benefit derives from minimum cost and sufficient supply availability. Customers willing to share in "availability risk" can derive further benefit by participating in controlled outage programs. Specifically, whenever utilities foresee dangerous loading patterns, there is a need for a rapid reduction in demand either system-wide or at specific locations. The utility needs to get relief in order to solve its problems quickly and efficiently. This relief can come from customers who agree to curtail their loads upon request in exchange for an incentive fee. This thesis shows how utilities can get efficient load relief while maximizing their economic benefit. This work also shows how estimated customer cost functions can be calibrated, using existing utility data, to help in designing efficient demand management contracts. In order to design such contracts, optimal mechanism design is adopted from "Game Theory" and applied to the interaction between a utility and its customers. The idea behind mechanism design is to design an incentive structure that encourages customers to sign up for the right contract and reveal their true value of power. If a utility has demand management contracts with customers at critical locations, most operational problems can be solved efficiently. This thesis illustrates how locational attributes of customers incorporated into demand management contract design can have a significant impact in solving system problems. This kind of demand management contracts can also be used by an Independent System Operator (ISO). During times of congestion a loss of economic surplus occurs. When the market is too slow or cannot help relieve congestion, demand management

  18. An Empirical Analysis of Air Force Food Service Management with Recommendations

    Science.gov (United States)

    1984-02-01

    Control Private Industry Restaurant 11 0 Management * Culinary Arts 87 * Contracting 3 7 * 14 Discussion Agreement between HQ and base personnel exists...food service personnel to attend culinary arts schools or to participate in competitions in the culinary arts , and through the establishment of food...service career field deserve the highest commendation for their professional approach to self-analysis and development. The cooks and supervisors with

  19. Valuation, hedging and the risk management of insurance contracts

    OpenAIRE

    Barbarin, Jérôme

    2008-01-01

    This thesis aims at contributing to the study of the valuation of insurance liabilities and the management of the assets backing these liabilities. It consists of four parts, each devoted to a specific topic. In the first part, we study the pricing of a classical single premium life insurance contract with profit, in terms of a guaranteed rate on the premium and a participation rate on the (terminal) financial surplus. We argue that, given the asset allocation of the insurer, these technic...

  20. Management and Administration of Contract MDA9O3-91- E-OO6I

    National Research Council Canada - National Science Library

    Gimble, Thomas

    1997-01-01

    The primary audit objective was to determine whether the Defense Supply Service-Washington and the Defense Contract Management Command managed and administered contract MDA9O3-91-D-OO6l in compliance...

  1. Food-service establishment wastewater characterization.

    Science.gov (United States)

    Lesikar, B J; Garza, O A; Persyn, R A; Kenimer, A L; Anderson, M T

    2006-08-01

    Food-service establishments that use on-site wastewater treatment systems are experiencing pretreatment system and/or drain field hydraulic and/or organic overloading. This study included characterization of four wastewater parameters (five-day biochemical oxygen demand [BOD5]; total suspended solids [TSS]; food, oil, and grease [FOG]; and flow) from 28 restaurants located in Texas during June, July, and August 2002. The field sampling methodology included taking a grab sample from each restaurant for 6 consecutive days at approximately the same time each day, followed by a 2-week break, and then sampling again for another 6 consecutive days, for a total of 12 samples per restaurant and 336 total observations. The analysis indicates higher organic (BOD5) and hydraulic values for restaurants than those typically found in the literature. The design values for this study for BOD5, TSS, FOG, and flow were 1523, 664, and 197 mg/L, and 96 L/day-seat respectively, which captured over 80% of the data collected.

  2. Workplace foodservice; perception of quality and trust.

    Science.gov (United States)

    Price, Sarah; Hartwell, Heather; Hemingway, Ann; Chapleo, Chris

    2016-02-01

    In settings such as workplaces there is a growing acceptance that the food provided has a significant impact on health and wellbeing. This is a captive environment where the overall contribution of the meal served could be an important element of the overall diet and represents an under researched area. Despite growing demand, little information is available; time pressure when making food choice alongside the challenge of understanding information provided can act as barriers for healthy selection and can also decrease confidence in the food system. We would also argue that the fundamental human right of informing consumers what they are eating is not currently being addressed and is underscored. This study used focus groups to explore criteria that motivate peoples' food choice in a workplace foodservice setting. Thematic analysis was applied to categorise data according to frequently occurring responses. Data were collected from four focus groups in Germany and the UK with a total of 23 participants. Although there is little expectation in the quality of food served in the workplace, respondents valued any transparency of information and the opportunity to socialise with other work colleagues. Criteria of importance were identified as: Value for money, Variety, Naturalness, Nutrition, Portion Size, Taste, Visual Appearance, Origin, Animal welfare, Environmental impact, Fair Trade and Organic. Gaining insight into these criteria can enable operators to meet the needs and expectations of their customers in order to increase confidence in the food provided and in addition signpost a healthier selection. Copyright © 2015 Elsevier Ltd. All rights reserved.

  3. Variables affecting high school students' perceptions of school foodservice.

    Science.gov (United States)

    Meyer, M K; Conklin, M T

    1998-12-01

    To determine if student satisfaction with high school foodservice is directly related to participation in the foodservice. A valid and reliable survey was conducted in a variety of classes such as English, history, and health science in grades 9 through 12, representing students aged 13 through 19 years. Students were asked 38 questions concerning variety of food, food quality, foodservice staff, aesthetics of the serving and dining area, and demographics. The study was conducted with 1,823 students from 9 schools representing 4 geographic regions. Stepwise multiple regression was used to determine the independent variables (attributes desired by the students) that most highly correlated with the dependent variable (satisfaction with the school foodservice overall). Variables most highly correlated with overall satisfaction were variety of food offered, flavor of food, attractiveness of food on the serving line, staff smiling and greeting students, quality of food choices, choices that allow students to meet cultural and ethnic preferences, courteousness of the staff, and quality of ingredients. Variety of food offered was the best predictor of satisfaction. A statistically significant difference was found (Pnutrition programs are critically important for providing nutrition to millions of our future leaders. Today it is not enough to prepare healthful, good-tasting food. High school students are sophisticated and are exposed at an early age to a variety of dining experiences including fast foods, ethnic cuisine, and fine dining. These factors have influenced the attributes students use to evaluate school foodservice. To maintain participation levels and financial stability, school foodservice professionals should evaluate student satisfaction with food quality, variety, and other variables that affect overall satisfaction and participation. These data may then be incorporated into continuous quality improvement and strategic planning. Marketing must be

  4. Financial Management: Contracts Classified as Unreconcilable by the Defense Finance and Accounting Service Columbus (Contract No. F30602-81-C-0153)

    National Research Council Canada - National Science Library

    Granetto, Paul J; Kornides, James L; Issel, John K; Knight, Clarence E., III; Bennett, Karen M

    2005-01-01

    .... The Defense Contract Management Agency (DCMA) office in Orlando, Florida, administered the contract until October 7, 1985, when the responsibility for contract administration was transferred to the DCMA office in Palm Bay, Florida...

  5. The Possibilities of Reducing Food Choice to Improve the Performance of College Foodservices.

    Science.gov (United States)

    Mirosa, Miranda; Loh, Joanne; Spence, Heather

    2016-07-01

    College administrative and management leaders, foodservice personnel, and student residents value social, nutritional, financial, and environmental sustainability in their dining expectations. Menu choice reduction looks promising as a strategy to achieve these goals. However, foodservice research about dominant attitudes across these stakeholders is limited. To identify qualitative views from all stakeholders about choice reduction to ensure that any changes to the meal service are not to the detriment of consumer satisfaction. A comprehensive list of 74 statements representing the spectrum of attitudes surrounding choice was generated by searching a variety of resources, including academic literature and Internet sites, and by conducting semistructured interviews with stakeholders. A final set of 42 statements resulted from researcher scrutiny for optimum balance, clarity, appropriateness, simplicity, and applicability. A new sample of participants was then asked to sort these 42 statements into a normal distribution grid from "strongly disagree" to "strongly agree." A purposive convenience sample of stakeholders (staff n=5 and residents n=4) was used to identify statements about choice reduction. A second sample of stakeholders (staff n=6 and residents n=29) were recruited to sort the final 42 statements. Q methodology analysis techniques were used. This involved conducting a by-person factor analysis, using the centroid factor extraction method because of the permissiveness it allows for data exploration. A varimax factor rotation to enhance interpretability of the results identified shared viewpoints. Three dominant viewpoints toward the possibility of choice reduction in the meal service were identified. Factor 1 was "health driven" (in which healthiness was paramount). Factor 2 was "variety seekers" (in which choice had instrumental value). Factor 3 was "choice lovers" (in which choice had intrinsic value). Although participants could see a number of

  6. Contract Management of LHC Civil Engineering at Point 5

    CERN Document Server

    Osborne, J A

    1999-01-01

    Civil engineering work commenced in August 1998 at LEP Point 5 for the underground and surface works necessary to accommodate the CMS detector for the LHC project. The principal underground works consist of two parallel caverns, separated by a support pillar, two new shafts, a number of smaller connection and service galleries and tunnel enlargements on the existing LEP tunnel. The surface works consist of the 140 m long SX building for the detector assembly and numerous other steel and concrete structures necessary for the installation and operation of CMS. The civil engineering design and supervision has been awarded to a joint venture of Gibb (UK), SGI (Switzerland) and Geoconsult (Austria), and the contracting to a joint venture of Dragados (Spain) and Seli (Italy) for 112 MCHF. The aim of this paper is to discuss the management of this contract and in particular how the various parties interact in order to work most efficiently.

  7. Analysis of Naval Facilities Engineering Command’s (NAVFAC) Contracting Processes Using the Contract Management Maturity Model (CMMM)

    Science.gov (United States)

    2006-12-01

    change the corporate language to terms relating more directly to the DoD (i.e., the phrase “ CEO and other corporate executives” was changed to “chain...Antecedents and Consequences of Failed Governance: the Enron Example. Corporate Governance, 5: 5. Garrett, G., & Rendon, R. 2005(a). Contract Management...LIST OF ACRONYMS CECOS Civil Engineer Corps Officers School CEO Chief Executive Officer CMMAT Contract Management Maturity Assessment Tool CMMM

  8. Measuring School Foodservice Workers’ Perceptions of Organizational Culture

    Science.gov (United States)

    School foodservice workers (SFW) are a direct link to children eating school meals. SFW who perceive positive and supportive organizational culture at their school nutrition departments also may perceive that such environments foster their own promotion of healthful food choices by students. To date...

  9. The Naval Plant Representative Office Organization Transition into the Defense Contract Management Command; Impacts on Customers

    Science.gov (United States)

    1992-06-01

    Representative Office organization transition into the Defense Contract Management Command: impacts on customers Tiffany, Murray L., III Monterey, California...1 TITLE (Include Security Classification) The Naval Plant Representative Office Organization Transition into the Defense Contract Management Command...public release; distribution is unlimited. The Naval Plant Representative Office Organization Transition into the Defense Contract Managagement Command

  10. Defense Contract Management Area Operations Frankfurt, Germany, Contract for Professional and Technical Services

    National Research Council Canada - National Science Library

    Granetto, Paul

    1994-01-01

    The audit objectives were to determine the validity of allegations made in the DoD Hotline complaint and to evaluate the award and administrative contracting procedures over delivery orders on contract DAEA18-89-D-OO15...

  11. Project Hanford Management Contract (PHMC) pollution prevention program implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Place, B.G., Westinghouse Hanford

    1996-12-31

    This plan documents the Project Hanford Management Contract (PHMC) Pollution Prevention/Waste Minimization (P2/WMin) Program. The subject implementation plan has been updated to reflect the Fiscal Year (FY) 1997 contract structure in which Fluor Daniel Hanford, Inc. (FDH) is the management and integration contractor. The P2/WMin Program scope includes FDH as the principal PHMC contractor, and B&W Hanford Company (BWHC), Duke Engineering & Services Hanford, Inc. (DESH), Lockheed Martin Hanford Corporation, (LMHC), Numatec Hanford Corporation (NHC), Rust Federal Services of Hanford, Inc. (RFSH), and DynCorp Tri-Cities Services, Inc. (DYN) as PHMC contractors, as well as subcontracting enterprise companies, such as Fluor Daniel Northwest, Inc. (FDNW), Lockheed Martin Services, Inc. (LMSI), and Rust Federal Services Northwest (RFS), which provide engineering, operation, construction, maintenance, and computer services for the Hanford Site. The P2/WMin Program scope also includes all other subcontractor-affiliated enterprise companies, such as B&W Protec, Inc. (BWP), DE&S Northwest, Inc. (DESNW), and SGN Eurisys Services Corp. (SESC).

  12. Management of government quality assurance functions for NASA contracts

    Science.gov (United States)

    1993-01-01

    This handbook sets forth requirements for NASA direction and management of government quality assurance functions performed for NASA contracts and is applicable to all NASA installations. These requirements will standardize management to provide the minimum oversight and effective use of resources. This handbook implements Federal Acquisition Regulation (FAR) Part 46, NASA FAR Supplement 18-46, Quality Assurance, and NMI 7410.1. Achievement of established quality and reliability goals at all levels is essential to the success of NASA programs. Active participation by NASA and other agency quality assurance personnel in all phases of contract operations, including precontract activity, will assist in the economic and timely achievement of program results. This involves broad participation in design, development, procurement, inspection, testing, and preventive and corrective actions. Consequently, government, as well as industry, must place strong emphasis on the accomplishment of all functions having a significant bearing on quality and reliability from program initiation through end-use of supplies and services produced. For purposes of implementing NASA and other agency agreements, and to provide for uniformity and consistency, the terminology and definitions prescribed herein and in a future handbook shall be utilized for all NASA quality assurance delegations and subsequent redelegations.

  13. Importance of relationship quality and communication on foodservice for the elderly

    Science.gov (United States)

    Back, Ki Joon; Shanklin, Carol W.

    2011-01-01

    In order to promote foodservice for the elderly, foodservice managers in Continuing Care Retirement Communities (CCRCs) must identify the main factors to enhance the satisfaction and behavioral intentions with food service. The purpose of this study was to investigate the relationships between relationship quality (consisting of trust, commitment, and satisfaction) and communication in the formation of elderly's behavioral intentions with food services at CCRCs. A survey was administered to residents in two CCRCs and a total of 327 residents participated. A tested structural equation model exhibited good model fit and explanatory power of the study construct. Satisfaction directly influenced word-of-mouth and service quality has an influence on commitment. Commitment was a significant determinant of behavioral intentions to eat more often in the dining room. Also, communication showed positive association with trust. The results provided strong evidence for the importance of satisfaction and communication as a consequence of relationship marketing efforts. Suggestions for future research to better understand the elderly' behavioral intention judgments were given. PMID:21487500

  14. 76 FR 14543 - Federal Acquisition Regulation; Proper Use and Management of Cost-Reimbursement Contracts

    Science.gov (United States)

    2011-03-16

    ..., 42, and 50 RIN 9000-AL78 Federal Acquisition Regulation; Proper Use and Management of Cost... management of other than firm-fixed-price contracts (e.g., cost-reimbursement, time-and-material, and labor... Government Contracting. Section 864 requires the FAR to be revised to address the use and management of cost...

  15. 77 FR 12925 - Federal Acquisition Regulation; Proper Use and Management of Cost-Reimbursement Contracts

    Science.gov (United States)

    2012-03-02

    ..., 42, and 50 RIN 9000-AL78 Federal Acquisition Regulation; Proper Use and Management of Cost... addresses the use and management of cost- reimbursement contracts. DATES: Effective Date: April 2, 2012 FOR... Contracting. Section 864 of the law requires amending the FAR to address the use and management of cost...

  16. The Contract Management Body of Knowledge: A Comparison of Contracting Competencies

    Science.gov (United States)

    2013-12-01

    Retrieved 3 December 2013 from http://www.fai.gov/ drupal /certification/contracting-competencies#tech Federal Acquisition Institute (FAI). (2013...About FAI. Retrieved 30 September 2013 from http://www.fai.gov/ drupal /about/about-fai Garrett, G. A. (2010). World class contracting. Riverwoods, IL

  17. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  18. Differences in Services and Fees for Management and Administration of Iraq Reconstruction Contracts

    National Research Council Canada - National Science Library

    Warren, David; Childress, David; Salvatierra, George; Thompson, Chuck; Williams, Roger M

    2008-01-01

    ...), a field operating agency of the Air Force Civil Engineer, are two primary organizations providing project management and contract administration services for major Iraq reconstruction projects...

  19. Project Contract Management and a Theory of Organization

    NARCIS (Netherlands)

    J.R. Turner (Rodney)

    2001-01-01

    textabstractThis paper attempts to develop concepts of project and contract organization to predict the selection of contract type on infrastructure projects. Conventional wisdom is that at low risk fixed price contracts are best, moving to remeasurement and then cost plus as risk increases. We

  20. Contract Management: DOD Begins New Effort to Improve Reporting of Contract Service Costs

    National Research Council Canada - National Science Library

    1999-01-01

    Although the Department of Defense (DOD) is increasing its reliance on contractor support, long-standing concerns exist regarding the accuracy and reliability of its accounting for the costs of contract services, particularly advisory...

  1. Contract Audit Followup: Defense Contract Management Agency Santa Ana Office's Actions on Incurred Cost Audits

    National Research Council Canada - National Science Library

    2005-01-01

    This report addresses the DCMA Santa Ana District Office. DoD Directive 7640.2, "Policy for Follow-up on Contract Audit Reports," February 12, 1988, as amended August 16, 1995, implements OMB Circular A-50...

  2. Financial Management: Reopening of Contracts in the Mechanization of Contract Administration Services System

    National Research Council Canada - National Science Library

    Granetto, Paul

    2003-01-01

    The Defense Finance and Accounting Service planned to replace the payment and entitlement function performed by the Mechanization of Contract Administration Services system with a new or modified system...

  3. HB 1347 and Its Relationship to Foodservice Outsourcing in Illinois Public Schools

    Science.gov (United States)

    Brashear, Gary L.

    2012-01-01

    This study examined foodservice outsourcing in the State of Illinois. School administrators currently outsourcing foodservice were surveyed about their perceptions of HB1347 and its components. This study looked at HB1347 in Illinois, and its effects on outsourcing in school districts. Data for this study was collected from a survey sent to 100%…

  4. MANAGING ENGINEERING ACTIVITIES FOR THE PLATEAU REMEDIATION CONTRACT - HANFORD

    Energy Technology Data Exchange (ETDEWEB)

    KRONVALL CM

    2011-01-14

    In 2008, the primary Hanford clean-up contract transitioned to the CH2MHill Plateau Remediation Company (CHPRC). Prior to transition, Engineering resources assigned to remediation/Decontamination and Decommissioning (D&D) activities were a part of a centralized engineering organization and matrixed to the performing projects. Following transition, these resources were reassigned directly to the performing project, with a loose matrix through a smaller Central Engineering (CE) organization. The smaller (10 FTE) central organization has retained responsibility for the overall technical quality of engineering for the CHPRC, but no longer performs staffing and personnel functions. As the organization has matured, there are lessons learned that can be shared with other organizations going through or contemplating performing a similar change. Benefits that have been seen from the CHPRC CE organization structure include the following: (1) Staff are closely aligned with the 'Project/facility' that they are assigned to support; (2) Engineering priorities are managed to be consistent with the 'Project/facility' priorities; (3) Individual Engineering managers are accountable for identifying staffing needs and the filling of staffing positions; (4) Budget priorities are managed within the local organization structure; (5) Rather than being considered a 'functional' organization, engineering is considered a part of a line, direct funded organization; (6) The central engineering organization is able to provide 'overview' activities and maintain independence from the engineering organizations in the field; and (7) The central engineering organization is able to maintain a stable of specialized experts that are able to provide independent reviews of field projects and day-to-day activities.

  5. Academic health systems management: the rationale behind capitated contracts.

    Science.gov (United States)

    Taheri, P A; Butz, D A; Greenfield, L J

    2000-06-01

    To determine why hospitals enter into "capitated" contracts, which often generate accounting losses. The authors' hypothesis is that hospitals coordinate contracts to keep beds full and that in principal, capitated contracts reflect sound capacity management. In high-overhead industries, different consumers pay different prices for similar services (e.g., full-fare vs. advanced-purchase plane tickets, full tuition vs. financial aid). Some consumers gain access by paying less than total cost. Hospitals, like other high-overhead business enterprises, must optimize the use of their capacity, amortizing overhead over as many patients as possible. This necessity for enhanced throughput forces hospitals and health systems to discount empty beds, sometimes to the point where they incur accounting losses serving some payors. The authors analyzed the cost accounting system at their university teaching hospital to compare hospital and intensive care unit (ICU) lengths of stay (LOS), variable direct costs (VDC), overhead of capitated patients, and reimbursement versus other payors for all hospital discharges (n = 29,036) in fiscal year 1998. The data were analyzed by diagnosis-related groups (DRGs), length of stay (LOS), insurance carrier, proximity to hospital, and discharge disposition. Patients were then distinguished across payor categories based on their resource utilization, proximity to the hospital, DRG, LOS, and discharge status. The mean cost for capitated patients was $4,887, less than half of the mean cost of $10,394 for the entire hospitalized population. The mean capitated reimbursement was $928/day, exceeding the mean daily VDC of $616 but not the total cost of $1,445/day. Moreover, the mean total cost per patient day of treating a capitated patient was $400 less than the mean total cost per day for noncapitated patients. The hospital's capitated health maintenance organization (HMO) patients made up 16. 0% of the total admissions but only 9.4% of the total

  6. Assessing Contract Management Maturity: U.S. Army Joint Munitions and Lethality Contracting Center, Army Contracting Command, Picatinny Arsenal

    Science.gov (United States)

    2009-09-01

    employee retention at the journeyman level; and internal friction. 69 Leadership/Management being the last category received 8% of the response. In...examples of this category’s responses include: employee retention at the journeyman level; and Internal friction. Leadership/Management being the last

  7. How do the work environment and work safety differ between the dry and wet kitchen foodservice facilities?

    Science.gov (United States)

    Chang, Hye-Ja; Kim, Jeong-Won; Ju, Se-Young; Go, Eun-Sun

    2012-08-01

    In order to create a worker-friendly environment for institutional foodservice, facilities operating with a dry kitchen system have been recommended. This study was designed to compare the work safety and work environment of foodservice between wet and dry kitchen systems. Data were obtained using questionnaires with a target group of 303 staff at 57 foodservice operations. Dry kitchen facilities were constructed after 2006, which had a higher construction cost and more finishing floors with anti-slip tiles, and in which employees more wore non-slip footwear than wet kitchen (76.7%). The kitchen temperature and muscular pain were the most frequently reported employees' discomfort factors in the two systems, and, in the wet kitchen, "noise of kitchen" was also frequently reported as a discomfort. Dietitian and employees rated the less slippery and slip related incidents in dry kitchens than those of wet kitchen. Fryer area, ware-washing area, and plate waste table were the slippery areas and the causes were different between the functional areas. The risk for current leakage was rated significantly higher in wet kitchens by dietitians. In addition, the ware-washing area was found to be where employees felt the highest risk of electrical shock. Muscular pain (72.2%), arthritis (39.1%), hard-of-hearing (46.6%) and psychological stress (47.0%) were experienced by employees more than once a month, particularly in the wet kitchen. In conclusion, the dry kitchen system was found to be more efficient for food and work safety because of its superior design and well managed practices.

  8. Importance-Performance Analysis (IPA) of Foodservice Operation, Dietary Life Education, and Nutrition Counseling Tasks of Nutrition Teachers and Dietitians in Jeju, Korea.

    Science.gov (United States)

    Park, Eun A; Chae, In Sook; Jo, Mi Na

    2017-10-22

    The purpose of this study was to analyze foodservice operation, dietary life education, and nutrition counseling tasks of nutrition teachers and dietitians in elementary, middle, and high schools in Jeju, Korea, and to provide effective ways to implement dietary life education and nutrition counseling in schools. This study surveyed 94 nutrition teachers and 46 dietitians working at elementary, middle, and high schools in Jeju during 7-14 May 2015. The importance and performance of 16 tasks of nutrition teachers and dietitians were measured using questionnaires. The data was analyzed by using the SPSS software and Importance-Performance Analysis (IPA). Importance was ranked in the order of foodservice operation (4.72), dietary life education (4.37), and nutrition counseling (4.24); and performance was ranked in the order of foodservice operation (4.48), dietary life education (3.70), and nutrition counseling (3.22). The importance-performance matrix showed that in Quadrant 4, the "Concentrate Here" item was "nutrition and dietary life education for students", while in Quadrant 2, the "Possible Overkill" item was "cost control and office management". These findings suggest that it is important to reduce unnecessary administrative and office management tasks in order for nutrition teachers and dietitians to implement effective nutrition education, dietary life education, and nutrition counseling programs.

  9. Contracts and management services site support program plan WBS 6.10.14

    Energy Technology Data Exchange (ETDEWEB)

    Knoll, J.M. Jr.

    1994-09-01

    Contracts and Management Services is recognized as the central focal point for programs having company or sitewide application in pursuit of the Hanford Missions`s financial and operational objectives. Contracts and Management Services actively pursues cost savings and operational efficiencies through: Management Standards by ensuring all employees have an accessible, integrated system of clear, complete, accurate, timely, and useful management control policies and procedures; Contract Reform by restructuring the contract, organization, and cost accounting systems to refocus Hanford contract activities on output products; Systems and Operations Evaluation by directing the Cost Reduction program, Great Ideas, and Span of Management activities; Program Administration by enforcing conditions of Accountability (whether DEAR-based or FAR-based) for WHC, BCSR, ICF KH, and BHI; Contract Performance activities; chairing the WHC Cost Reduction Review Board; and analyzing companywide Performance Measures; Data Standards and Administration by establishing and directing the company data management program; giving direction to the major RL programs and mission areas for implementation of cost-effective and efficient data management practices; directing all operations, application, and interfaces contained within the Hanford PeopleCore System; directing accomplishment and delivery of TPA data management milestones; and directing the sitewide data management processes for Data Standards and the Data Directory.

  10. Psychological contracts and commitment amongst nurses and nurse managers: a discourse analysis.

    Science.gov (United States)

    McCabe, T J; Sambrook, Sally

    2013-07-01

    Few studies explore the link between the psychological contracts and the commitment of nursing professionals in the healthcare sector, and how perceived breaches of the psychological contract can impact on nurses' commitment levels. This study explores the connections between the psychological contracts and organisational and professional commitment of nurses and nurse managers. Semi-structured interviews were conducted with nurses and nurse managers, to explore the connections between their psychological contracts and organisational and professional commitment. Large acute and small community organisation within the British National Health Service. 28 nurses and 11 nurse managers working within an acute and a community sector organisation - 20 and 19 in each organisation. Participants were selected through a process of purposive sampling, reflecting variations in terms of age, grade, ward and tenure. A discourse analysis was conducted on the qualitative data from the thirty nine semi-structured interviews. Two overall themes emerged, professional and managerial values. Professional values included the sub-themes: professional recognition; immediate work environment - leadership and peer support; professional development and progression. Sub-themes under managerial values included: involvement; general management; resource management. The findings suggest that nurses and nurse managers are governed by relational psychological contracts, underpinned by an affective and to a lesser extent normative commitment towards the nursing profession. They emphasise 'professional values', and professional commitment, as the basis for positive psychological contracts amongst nursing professionals. There was anecdotal evidence of relational psychological contract breach, with decreasing job satisfaction as the outcome of perceived psychological contract breach. Positive psychological contracts and commitment levels amongst nursing professionals can be supported by managers been

  11. Performance Contracting as a Performance Management Tool in the Public Sector in Kenya: Lessons of learning

    Science.gov (United States)

    Hope, Kempe Ronald, Sr.

    2013-01-01

    The purpose of this article is to provide an assessment and analysis of public sector performance contracting as a performance management tool in Kenya. It aims to demonstrate that performance contracting remains a viable and important tool for improving public sector performance as a key element of the on-going public sector transformation…

  12. 41 CFR 102-72.75 - What are the requirements for obtaining a delegation of lease management authority (contracting...

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What are the requirements for obtaining a delegation of lease management authority (contracting officer representative authority) from GSA? 102-72.75 Section 102-72.75 Public Contracts and Property Management Federal Property...

  13. 48 CFR 970.5215-3 - Conditional payment of fee, profit, and other incentives-facility management contracts

    Science.gov (United States)

    2010-10-01

    ..., profit, and other incentives-facility management contracts 970.5215-3 Section 970.5215-3 Federal....5215-3 Conditional payment of fee, profit, and other incentives—facility management contracts As... Incentives—Facility Management Contracts (AUG 2009) (a) General. (1) The payment of earned fee, fixed fee...

  14. Pain-behavior contracts: effective management of the adolescent in sickle-cell crisis.

    Science.gov (United States)

    Burghardt-Fitzgerald, D C

    1989-10-01

    Pain-behavior contracts can be utilized as an alternative method of managing the discomfort experienced by adolescents in sickle-cell crisis. The psychological impact of sickle-cell disease, the developmental need of adolescents to control situations in which they find themselves, and principles of pain control all provide theoretical bases supporting the use of pain contracts in clinical practice. If nurses are to effectively use such contracts, they must understand how to develop and implement them in the clinical setting. In addition, research can be designed to explore the use of such contracts for adolescents and staff.

  15. Presence of microorganisms from isolated Megaselia spp. in foodservice establishments.

    Science.gov (United States)

    Soler, Carla; Esteban, J Guillermo; Jiménez, Ricardo; Mañes, Jordi; Soriano, José Miguel

    2015-06-01

    The transmission of harmful pathogens by arthropods is an increasing health concern. More concretely, flies are known to be able to transmit the infectious agent mechanically. The present work shows a case report occurred from foodservice establishments where were isolated and identified, at the first time, Megaselia spp. in the food preparation place. Furthermore, microorganisms were analyzed from these flies. It is based in entomological and microbiological analysis. Mesophilic aerobic flora and Enterobacteriaceae were found in all the samples, exceeding the limits established from food commodities on 41.7% (5/12) for mesophilic aerobic bacteria and 66.7% (8/12) for Enterobacteriaceae. Furthermore, 25% (3/12) of analyzed flies were found positive to Escherichia coli, data that can be linked with the microbiological food results. The most surprising results were the presence of S. aureus in 66.7% (8/12) of the analyzed flies. A binomial relationship among Megaselia spp. and bacteria is demonstrated being an important study to demonstrate that must be checked more hygienically measurement in foodservice. Copyright AULA MEDICA EDICIONES 2014. Published by AULA MEDICA. All rights reserved.

  16. Certified symbolic management of financial multi-party contracts

    DEFF Research Database (Denmark)

    Bahr, Patrick; Berthold, Jost; Elsman, Martin

    2015-01-01

    Domain-specific languages (DSLs) for complex financial contracts are in practical use in many banks and financial institutions today. Given the level of automation and pervasiveness of software in the sector, the financial domain is immensely sensitive to software bugs. At the same time......, there is an increasing need to analyse (and report on) the interaction between multiple parties. In this paper, we present a multi-party contract language that rigorously relegates any artefacts of simulation and computation from its core, which leads to favourable algebraic properties, and therefore allows...

  17. Analysis of the 918th Contracting Battalion and 410th Contracting Support Brigade Utilizing the Contract Management Maturity Model

    Science.gov (United States)

    2015-12-01

    management. Kaplan and Norton (1992) developed another model, the balanced scorecard , which provides insight into an organization’s progress toward its...strategic goals. The 11 balanced scorecard utilizes a set of performance measures based on the organizations’ vision and strategy (Christesen, 2008...capacity ( Balanced Scorecard Institute, n.d.). The balanced scorecard has evolved from simply measuring performance. The data collected are often used

  18. Importance–Performance Analysis (IPA) of Foodservice Operation, Dietary Life Education, and Nutrition Counseling Tasks of Nutrition Teachers and Dietitians in Jeju, Korea

    Science.gov (United States)

    Park, Eun A; Chae, In Sook; Jo, Mi Na

    2017-01-01

    The purpose of this study was to analyze foodservice operation, dietary life education, and nutrition counseling tasks of nutrition teachers and dietitians in elementary, middle, and high schools in Jeju, Korea, and to provide effective ways to implement dietary life education and nutrition counseling in schools. This study surveyed 94 nutrition teachers and 46 dietitians working at elementary, middle, and high schools in Jeju during 7–14 May 2015. The importance and performance of 16 tasks of nutrition teachers and dietitians were measured using questionnaires. The data was analyzed by using the SPSS software and Importance–Performance Analysis (IPA). Importance was ranked in the order of foodservice operation (4.72), dietary life education (4.37), and nutrition counseling (4.24); and performance was ranked in the order of foodservice operation (4.48), dietary life education (3.70), and nutrition counseling (3.22). The importance–performance matrix showed that in Quadrant 4, the “Concentrate Here” item was “nutrition and dietary life education for students”, while in Quadrant 2, the “Possible Overkill” item was “cost control and office management”. These findings suggest that it is important to reduce unnecessary administrative and office management tasks in order for nutrition teachers and dietitians to implement effective nutrition education, dietary life education, and nutrition counseling programs. PMID:29065495

  19. 42 CFR 457.955 - Conditions necessary to contract as a managed care entity (MCE).

    Science.gov (United States)

    2010-10-01

    ...) ALLOTMENTS AND GRANTS TO STATES Program Integrity § 457.955 Conditions necessary to contract as a managed...; (2) Prohibit MCEs from conducting any unsolicited personal contact with a potential enrollee by an...

  20. Positive management : The relationship between the psychological contract, employee engagement and organisational commitment

    NARCIS (Netherlands)

    D. Van Elst; D.N.D. Meurs

    2016-01-01

    Purpose: To analyse the connection between the psychological contract, employee engagement and organisational commitment in the context of positive management and to create a theoretical background for future research.

  1. Customer relationship management in the contract pharmaceutical industry: an exploratory study for measuring success.

    Science.gov (United States)

    Kros, John F; Nadler, Scott; Molis, Justin

    2007-01-01

    Managing customer relationships is a very important issue in business-to-business markets. This research investigates the growing number of available resources defining Customer Relationship Management (CRM) efforts, and how they are being applied within the Contract Pharmaceutical Manufacturing industry. Exploratory study results using face-to-face and telephone questionnaires based on four criteria for rating a company's CRM efforts are presented. Data was collected from large Contract Pharmaceutical Manufacturing companies in the US market. The results and conclusions are discussed relating how the Contract Pharmaceutical Manufacturing industry is implementing CRM including some potential steps to take when considering a CRM initiative.

  2. Office of Inspector General audit report on Project Hanford management contract costs and performance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    On August 6, 1996, the Richland Operations Office (Richland) awarded the Project Hanford Management Contract (Management Contract) to Fluor Daniel Hanford, Inc. (Fluor Daniel). This performance-based, 5-year contract to support cleanup of the Department of Energy`s (DOE) Hanford Site (Hanford) contained performance goals or expectations related to the stabilization, transition, and diversification of the Tri-Cities` economy near Hanford in southeastern Washington. One of these economic goals was that Fluor Daniel and its major subcontractors would help generate 3,000 new, non-Hanford, private sector jobs that would help stabilize and diversify the Tri-Cities` economy. The contract specifically called for Fluor Daniel to help generate 200 jobs, establish an investment fund, and bring 6 new growth-oriented enterprise companies to the Tri-Cities by the end of Fiscal Year (FY) 1997. The objective of the audit was to determine whether Richland was making adequate progress in stabilizing and diversifying the economy of the Tri-Cities by creating 3,000 new, non-Hanford jobs within 5 years. Accordingly, the author examined the progress made in FY 1997, which was the first year of the Management Contract. Richland and Fluor Daniel are at risk of not meeting the Management Contract`s goals of stabilizing and diversifying the economy of the Tri-Cities because most of the new jobs created during FY 1997 were not comparable to Hanford jobs and, thus, may not sustain long-term economic goals. Therefore, Fluor Daniel has not met its expectations in the first year and is not making adequate progress toward meeting the Management Contract`s overall economic goals.

  3. Implementing healthier foodservice guidelines in hospital and federal worksite cafeterias: barriers, facilitators and keys to success.

    Science.gov (United States)

    Jilcott Pitts, S B; Graham, J; Mojica, A; Stewart, L; Walter, M; Schille, C; McGinty, J; Pearsall, M; Whitt, O; Mihas, P; Bradley, A; Simon, C

    2016-12-01

    Healthy foodservice guidelines are being implemented in worksites and healthcare facilities to increase access to healthy foods by employees and public populations. However, little is known about the barriers to and facilitators of implementation. The present study aimed to examine barriers to and facilitators of implementation of healthy foodservice guidelines in federal worksite and hospital cafeterias. Using a mixed-methods approach, including a quantitative survey followed by a qualitative, in-depth interview, we examined: (i) barriers to and facilitators of implementation; (ii) behavioural design strategies used to promote healthier foods and beverages; and (iii) how implementation of healthy foodservice guidelines influenced costs and profitability. We used a purposive sample of five hospital and four federal worksite foodservice operators who recently implemented one of two foodservice guidelines: the United States Department of Health and Human Services/General Services Administration Health and Sustainability Guidelines ('Guidelines') in federal worksites or the Partnership for a Healthier America Hospital Healthier Food Initiative ('Initiative') in hospitals. Descriptive statistics were used to analyse quantitative survey data. Qualitative data were analysed using a deductive approach. Implementation facilitators included leadership support, adequate vendor selections and having dietitians assist with implementation. Implementation barriers included inadequate selections from vendors, customer complaints and additional expertise required for menu labelling. Behavioural design strategies used most frequently included icons denoting healthier options, marketing using social media and placement of healthier options in prime locations. Lessons learned can guide subsequent steps for future healthy foodservice guideline implementation in similar settings. © 2016 The British Dietetic Association Ltd.

  4. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  5. The Effects of Contingency Contract Negotiation and Management on the Academic Achievement and Self Concept of Community College Students.

    Science.gov (United States)

    Lewis, James M.; Wall, Shavaun M.

    1979-01-01

    Instructor-made quizzes, the Tennessee Self-Concept Scale, and Miskimins' Self-Goal-Other Discrepancy Scale were used to measure achievement and self-concept in this study of contract procedures and contract management. Students in the negotiated contract and teacher-managed conditions obtained significantly higher final grades than those in other…

  6. External Peer Review Report on the Defense Contract Management Agency Office of Independent Assessment Internal Review Team

    Science.gov (United States)

    2015-11-02

    External Peer Review Report on the Defense Contract Management Agency Office of Independent Assessment Internal Review Team N O V E M B E R 2 , 2 0 1 5...MANAGEMENT AGENCY SUBJECT: External Peer Review Report on the Defense Contract Management Agency Office of Independent Assessment Internal Review Team...Report No. DODIG-2016-007) Attached is the External Peer Review Report on the Defense Contract Management Agency Office of Independent Assessment

  7. The many outcomes from contracting out: The voice of public managers

    DEFF Research Database (Denmark)

    Lindholst, Andrej Christian; Hansen, Morten Balle; Randrup, Thomas Barfoed

    2017-01-01

    for gaining deeper, more detailed insights. The public manager perspective is explored in an inductive analysis of answers to open-ended survey questions collected from public managers with contracting experience within the context of municipal park management in Scandinavia. The emerging managerial...... of some specific outcomes (e.g. learning) complements existing research themes. Our findings sustain the initial argument, demonstrating how the stakeholder approach can produce new insights. A key implication is that future research can benefit from assessing contracting outcomes by providing voice...

  8. Negotiating and Administering Contracts--July. School Management Handbook Number 6.

    Science.gov (United States)

    National Association of Elementary School Principals, Arlington, VA.

    This part of the School Management Handbook provides school administrators with an overview of the factors affecting collective bargaining and contract management in the schools. The first section introduces the concept of collective bargaining in education, itemizing the legal principles underlying bargaining and reviewing the principal's roles…

  9. Defense Contract Management Command Capitalization of Fixed Assets

    National Research Council Canada - National Science Library

    Young, Shelton

    1997-01-01

    The audit objective was to determine whether the Defense Logistics Agency and the Defense Finance and Accounting Service had implemented effective management control procedures and complied with laws...

  10. Financial valuation of incentive arrangements in managed care contracts: a real options approach.

    Science.gov (United States)

    Maurer, R T

    2001-01-01

    Managed care provider contracts with risk-based compensation arrangements are similar to derivative securities in that the value of a contract depends on the value of a more fundamental asset: the health plan's investment in the provider's member panel. As such, the financial value of the incentive to avoid investing in the health of the member panel can be modeled using financial engineering techniques.

  11. Contract case managers prove cost effective in federal workers' compensation programs.

    Science.gov (United States)

    Mallon, Timothy Michael; Cloeren, Marianne; Firestone, Lisa Michelle; Burch, Helen Christine

    2008-03-01

    This pilot study examined whether contract case managers are cost effective in reducing workers' compensation (WC) costs and preventing injuries. We placed contract medical case managers at four installations where they employed private industry best practices. A needs assessment was performed and site-specific targeted interventions were developed. Case managers improved WC program effectiveness by ensuring command support, and strengthening the case management process. They minimized lost work time and provided the WC team resources to review the oldest cases. Case managers cost $1.25 million and they generated $4.4 million in savings for a 3.52 return on investment. Case managers removed 73 workers from long-term rolls by making use of vocational rehabilitation, finding modified duty jobs, offering workers medical retirement, and terminating benefits when workers refused to work after being offered a job. This study of medical case managers demonstrates they can reduce WC costs.

  12. Privacy Management Contracts And Economics, Using Service Level Agreements (Sla)

    OpenAIRE

    Pau, Louis-François

    2005-01-01

    textabstractRecognizing the importance of privacy management as a business process and a business support process, this paper proposes the use of service level agreements around privacy features, including qualitative and quantitative ones. It also casts privacy management into a business perspective with benefits and costs to either party in a process.

  13. Privacy Management Contracts And Economics, Using Service Level Agreements (Sla)

    NARCIS (Netherlands)

    L-F. Pau (Louis-François)

    2005-01-01

    textabstractRecognizing the importance of privacy management as a business process and a business support process, this paper proposes the use of service level agreements around privacy features, including qualitative and quantitative ones. It also casts privacy management into a business

  14. WasteWise Resource Management: Innovative Solid Waste Contracting Methods

    Science.gov (United States)

    Resource management is an innovative contractual partnership between a waste-generating organization and a qualified contractor that changes the nature of current disposal services to support waste minimization and recycling.

  15. [The use of management contracts and professional incentives in the public health sector].

    Science.gov (United States)

    Ditterich, Rafael Gomes; Moysés, Simone Tetu; Moysés, Samuel Jorge

    2012-04-01

    Results-based management is a cornerstone of reform in public administration, including the health field, and has become the basis for other innovations such as the institutionalization of management contracts and the use of professional incentives. This review article aims to introduce and discuss the use of such management contracts in the public health sector. Management by results has developed means and tools that highlight the importance of shared responsibility and mutual commitment between workers and management-level directors. Thus, preset goals are negotiated among all the stakeholders and are evaluated periodically in order to grant professional incentives. It is necessary to improve the mechanisms for control and observation, to more precisely determine the healthcare and management indicators and their patterns, to train stakeholders in designing the plan, and to improve the use of professional incentives in order to effectively increase accountability vis-à-vis the desired results.

  16. Reduction of construction wastes by improving construction contract management: a multinational evaluation.

    Science.gov (United States)

    Mendis, Daylath; Hewage, Kasun N; Wrzesniewski, Joanna

    2013-10-01

    The Canadian construction industry generates 30% of the total municipal solid waste deposited in landfills. Ample evidence can be found in the published literature about rework and waste generation due to ambiguity and errors in contract documents. Also, the literature quotes that disclaimer clauses in contract documents are included in the contractual agreements to prevent contractor claims, which often cause rework. Our professional practice has also noted that there are several disclaimer clauses in standard contract documents which have the potential to cause rework (and associated waste). This article illustrates a comparative study of standard contractual documents and their potential to create rework (and associated waste) in different regions of the world. The objectives of this study are (1) to analyse standard contractual documents in Canada, the USA and Australia in terms of their potential to generate rework and waste, and (2) to propose changes/amendments to the existing standard contract documents to minimise/avoid rework. In terms of construction waste management, all the reviewed standard contract documents have deficiencies. The parties that produce the contract documents include exculpatory clauses to avoid the other party's claims. This approach tends to result in rework and construction waste. The contractual agreements/contract documents should be free from errors, deficiencies, ambiguity and unfair risk transfers to minimise/avoid potential to generate rework and waste.

  17. School Building Projects: Managing Insurance and Contracts during Construction

    Science.gov (United States)

    Shands, Richard

    2011-01-01

    Managing the risks inherent in a building project presents a challenge and opportunities not often encountered in the ordinary affairs of a school district. A building project brings the district, its staff, and students, as well as the community, in close contact with architects and engineers and a number of contractors for a period of time often…

  18. Beyond the contract: managing risk in supply chain relations

    NARCIS (Netherlands)

    Dekker, H.C.; Sakaguchi, J.; Kawai, T.

    2013-01-01

    As a consequence of the development of intensified relations with suppliers, for many firms the supply chain has become a significant source of risk exposure. In this paper we examine firms' use of control practices to manage risks associated with intensified collaboration with supply chain

  19. Managing logging residue under the timber sale contract.

    Science.gov (United States)

    Thomas C. Adams

    1980-01-01

    Management of logging residue is becoming an important part of timber sale planning. This involves controlling the amount of residue remaining on the ground and its distribution by diameter size class. Some residue is beneficial.An interdisciplinary team specified a desired residue level for one clearcutting unit of this trial. For comparison another cutting...

  20. Usage of Option Contracts for Foreign Exchange Risk Management

    Directory of Open Access Journals (Sweden)

    Daniel Armeanu

    2007-06-01

    Full Text Available Today in Romania, in the context of the liberalization of the capital account and under a floating exchange rate (official is a managed floating currency regime established by National Bank of Romania the foreign exchange rate is very volatile. In consequence the financial institutions, corporations and, especially, the importers and exporters have to deal with a big exposition of currency risk related with their activities. Financial institutions and corporations today must adopt new roles in order to compete successfully in the explosively evolving foreign exchange markets. The methods, instruments and techniques used to manage foreign exchange risk are more complex than ever before. The objective of our paper is to provide the techniques and insights needed to pinpoint opportunities and control risks. We will present the most modern practical methods for managing the currency risk: option strategies (spread, strangle, straddle, etc. Also we will present the advantage, the disadvantage and our opinions related with the use of currency derivatives instruments (especially currency strategies options, making a comparative analysis.

  1. THE NEW FACILITIES MANAGEMENT CONTRACT AT CERN FROM 1st JULY 2002

    CERN Multimedia

    Mauro Nonis

    2002-01-01

    Within the ST Division, all the Facilities Management activities have been under the ST/TFM group responsibility until the 30th June 2002, who has performed them using around 20 industrial support contracts. Starting from the 1st July 2002 a new unit, ST/FM, will take over these activities that will be unified into one single contract that has been adjudicated to the company Facilities Management Network SA. This contract will be in charge of the maintenance and minor works on tertiary installations (i.e. all structures and installations that have no direct relation to the running of the accelerators) for the following trades: Technical: heating, ventilation, air conditioning, plumbing, electricity, civil engineering (painting, roofing, glazing, blinds, fencing, masonry etc.), passenger and goods lifts, automatic and powered doors, kitchen equipment, roads, signs, keys and locks, office furniture, Services: waste collection, security, green areas, cleaning and sanitary supplies, disinfection, rodent contro...

  2. The new Facilities Management contract at CERN from 1st July 2002

    CERN Multimedia

    Mauro Nonis

    2002-01-01

    Within the ST Division, all the Facilities Management activities have been under the ST/TFM group responsibility until the 30th June 2002, who has performed them using around 20 industrial support contracts. Starting from the 1st July 2002 a new unit, ST/FM, will take over these activities that will be unified into one single contract that has been adjudicated to the company Facilities Management Network SA. This contract will be in charge of the maintenance and minor works on tertiary installations (i.e. all structures and installations that have no direct relation to the running of the accelerators) for the following trades: - Technical: heating, ventilation, air conditioning, plumbing, electricity, civil engineering (painting, roofing, glazing, blinds, fencing, masonry etc.), passenger and goods lifts, automatic and powered doors, kitchen equipment, roads, signs, keys and locks, office furniture, - Services: waste collection, security, green areas, cleaning and sanitary supplies, disinfection, rodent cont...

  3. A Contract That Manages Itself: The Time Has Arrived

    Science.gov (United States)

    2015-02-01

    What does that mean in simple terms? Look at the iPhone assistant Siri as an example. When a person asks Siri a ques- tion, such as “Do I need an...do they get closed if the contractor is no longer in business? How many information-technology (IT) business systems and spreadsheets does the Army...websites that contractors can use for eBusiness. That is just one portion of the conglomeration of IT business systems used for managing DoD acquisition

  4. 76 FR 76811 - Stakeholders Meeting Regarding Ready Reserve Force (RRF) Ship Manager Contract Program

    Science.gov (United States)

    2011-12-08

    ..., Ship Costs, Green Initiatives. Limited Scope Ship Management Contract for State Maritime Academy Schoolships. The meeting is open to the public. Due to space constraints, participation is limited to two (2) representatives per company/ organization. Advanced registration is recommended. The DOT building at 1200 New...

  5. A survey of innovative contracting for quality jobs and ecosystem management.

    Science.gov (United States)

    Cassandra. Moseley

    2002-01-01

    This survey identifies and defines innovative contracting mechanisms developed in the Forest Service Pacific Northwest Region and northern California. A survey of nine case studies reveals that several new mechanisms have facilitated ecosystem management, quality jobs, and administrative efficiencies, but at times innovation was hampered by Forest Service institutional...

  6. Review of the Literature on the Changing Psychological Contract: Implications on Career Management and Organizations

    Science.gov (United States)

    Lessner, Ryan; Akdere, Mesut

    2008-01-01

    The changing psychological contract has become a focus for organizational development, especially as job roles within organizations continue to change. This literature review examines the evolving employee-employer relationship and how this relationship has impacted career management and organizations for over the past century. The paper…

  7. DOD Service Acquisition: Improved Use of Available Data Needed to Better Manage and Forecast Service Contract Requirements

    Science.gov (United States)

    2016-02-01

    DOD SERVICE ACQUISITION Improved Use of Available Data Needed to Better Manage and Forecast Service Contract...Use of Available Data Needed to Better Manage and Forecast Service Contract Requirements Why GAO Did This Study In 2014, DOD obligated over $156...GAO recommends that the Secretary of Defense and military departments revise POM guidance, coordinate efforts to forecast services, and fully

  8. Proposal to Negotiate the Renewal of the Contract for the Provision of Database Management System Software

    CERN Document Server

    2002-01-01

    This document concerns the continued licensing of the Oracle Database Management System, which was selected for LEP in 1982 and is now used extensively at CERN in a wide range of application domains. The Finance Committee is invited to agree to the negotiation of the renewal of the contract with ORACLE SWITZERLAND for five years, for a total amount of 2 750 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH - 65%, US - 35%.

  9. Contract Management Monitoring And Evaluation Of Ghana School Feeding Programme At Atwima Kwanwoma District

    Directory of Open Access Journals (Sweden)

    Andrews Osei Mensah

    2015-08-01

    Full Text Available Ghana School Feeding Programme was introduced at Atwima Kwanwoma District and other parts of the country in 2008 to alleviate hunger and to provide good nutrition for pupils in the public basic schools. Caterers were given contract to provide food to the school pupils on every school-going day under Ghana school feeding programme. Some years have lapsed and there is the need to look back and evaluate this programme taking into consideration the award and management of those contracts. The study also examined how the programme is monitored and evaluated. Data was collected from 80 respondents comprising 29 school pupils and 51 other actors through the use of questionnaire and interview guide It was realised that caterers who are well experience in catering services were awarded contracts based on their past experience and financial abilities through submission of their certificates but not necessarily through bidding. The main component of managing the caterers contract included monitoring payment of debt and problems solving as well as supervision through visiting the schools on quarterly basis. The programme has helped to increase enrolment and retaining pupils in school. It was found out that food giving to the pupils was not served on time not regularly bases and was not sufficient to the pupils as well. The health component of the programme has not been successful as expected. It is recommended that fruits and variety of foods need to be introduced together with de-worming the pupils.

  10. Using SCOR as a Supply Chain Management Framework for Government Agency Contract Requirements

    Science.gov (United States)

    Paxton, Joseph; Tucker, Brian

    2010-01-01

    This paper will present a model that uses the Supply-Chain Operations Reference (SCOR) model as a foundation for a framework to illustrate the information needed throughout a product lifecycle to support a healthy supply chain management function and the subsequent contract requirements to enable it. It will also show where in the supply chain the information must be extracted. The ongoing case study used to exemplify the model is NASA's (National Aeronautics and Space Administration) Ares I program for human spaceflight. Effective supply chain management and contract requirements are ongoing opportunities for continuous improvement within government agencies, specifically development of systems for human spaceflight operations. Multiple reports from the Government Accountability Office (GAO) reinforce this importance. The SCOR model is a framework for describing a supply chain with process building blocks and business activities. It provides a set of metrics for measuring supply chain performance and best practices for continuously improving. This paper expands the application of the SCOR to also provide the framework for defining information needed from different levels of the supply chain and at different phases of the lifecycle. These needs can be incorporated into contracts to enable more effective supply chain management. Depending on the phase of the lifecycle, effective supply chain management will require involvement from different levels of the organization and different levels of the supply chain.

  11. 76 FR 62341 - Agency Information Collection Activities: Proposed Collection; Comment Request-School Foodservice...

    Science.gov (United States)

    2011-10-07

    ..., contact John Endahl, Senior Program Analyst, Office of Research and Analysis, Food and Nutrition Service... Food and Nutrition Service Agency Information Collection Activities: Proposed Collection; Comment Request--School Foodservice Indirect Cost Study AGENCY: Food and Nutrition Service (FNS), United States...

  12. School Foodservice Personnel's Struggle with Using Labels to Identify Whole-Grain Foods

    Science.gov (United States)

    Chu, Yen Li; Orsted, Mary; Marquart, Len; Reicks, Marla

    2012-01-01

    Objective: To describe how school foodservice personnel use current labeling methods to identify whole-grain products and the influence on purchasing for school meals. Methods: Focus groups explored labeling methods to identify whole-grain products and barriers to incorporating whole-grain foods in school meals. Qualitative analysis procedures and…

  13. Diabetes Preparedness in Schools: What Do Foodservice Personnel Need to Know to Respond?

    Science.gov (United States)

    Grenci, Alexandra

    2009-01-01

    Diabetes is increasing in youth, presenting a serious public health threat. Although type 1 diabetes has historically been more common in children, type 2 diabetes is on the rise, linked to increases in overweight and obesity among American youth, particularly those of high risk racial and ethnic groups. Foodservice personnel, along with other…

  14. Defense Contract Management: DOD’s Lack of Adherence to Key Contracting Principles on Iraq Oil Contract Put Government Interests at Risk

    Science.gov (United States)

    2007-07-01

    cost reductions attributable to its audit findings. We compared the sustention rates on DCAA’s 11 RIO I contract audits to the sustention rates...for 100 DCAA audits of other Iraq contract actions, and found that the sustention rates varied widely for both groups. DOD’s Army Corps of Engineers...Figure 1: Reasons for DCAA Questioned Costs 8 Figure 2: Elapsed Days from Notice to Proceed to Definitization 15 Figure 3: Comparison of Sustention

  15. Air Force Civil Engineer Center Management of Energy Savings Performance Contracts Needs Improvement

    Science.gov (United States)

    2016-05-04

    billions in energy costs, promote energy independence, and create tens of thousands of construction sector jobs. Federal Acquisition Regulation ESPC...infrastructure to reduce energy demand, increase renewable energy , and enhance the power resiliency of installations. Additional energy guidance provided...Force Civil Engineer Center Management of Energy Savings Performance Contracts Needs Improvement M A Y 4 , 2 0 1 6 Report No. DODIG-2016-087 Mission

  16. PSYCHOLOGICAL CONTRACT, MOTIVATION AND CHANGES IN HR MANAGEMENT IN THE AGE OF CRISIS IN GREECE

    OpenAIRE

    George, Xanthakis; Marianthi, Stogiannidou

    2012-01-01

    This paper outlines and discusses an approach to HR management in Greek Civil Engineer Consultant Companies during the economical crisis of 2010-12. A discussion of the definition of crisis nature and a brief literature review about the motivation and psychological contract are presented in the first part of it. The paper is integrated with one case study, the results and the conclusions. The aim of this paper is to investigate the crisis process, to explore the changes into psychological con...

  17. Managing the financial risk of low water levels in Great Lakes with index-based contracts

    Science.gov (United States)

    Meyer, E.; Characklis, G. W.; Brown, C. M.; Moody, P.

    2014-12-01

    Low water levels in the Great Lakes have recently had significant financial impacts on the region's commercial shipping, responsible for transporting millions of dollars' worth of bulk goods each year. Low lake levels can significantly affect shipping firms, as cargo capacity is a function of draft, or the distance between water level and the ship's bottom. Draft increases with weight, and lower lake levels force ships to reduce cargo to prevent running aground in shallow harbors, directly impacting the finances of shipping companies. Risk transfer instruments may provide adaptable, yet unexplored, alternatives for managing these financial risks, at significantly less expense than more traditional solutions (e.g., dredging). Index-based financial instruments can be particularly attractive as contract payouts are directly linked to well-defined transparent metrics (e.g., lake levels), eliminating the need for subjective adjustors, as well as concerns over moral hazard. In developing such instruments, a major challenge is identifying an index that is well correlated with financial losses, and thus a contract that reliably pays out when losses are experienced (low basis risk). In this work, a relationship between lake levels and shipping revenues is developed, and actuarial analyses of the frequency and magnitude of revenue losses is completed using this relationship and synthetic water level data. This analysis is used to develop several types of index-based contracts. A standardized suite of binary contracts is developed, with each indexed to lake levels and priced according to predefined thresholds. These are combined to form portfolios with different objectives (e.g. options, collars), with optimal portfolio structure and length of coverage determined by limiting basis risk and contract cost, using simulations over the historic dataset. Results suggest that portfolios of these binary contracts can substantially reduce the risk of financial losses during periods of

  18. Pan-European management of electricity portfolios: Risks and opportunities of contract bundling

    Energy Technology Data Exchange (ETDEWEB)

    Gampert, Markus [Institute for Future Energy Consumer Needs and Behavior, Faculty of Business and Economics/E.ON Energy Research Center, RWTH Aachen University, Mathieustrasse 6, 52074 Aachen (Germany); Madlener, Reinhard, E-mail: RMadlener@eonerc.rwth-aachen.d [Institute for Future Energy Consumer Needs and Behavior, Faculty of Business and Economics/E.ON Energy Research Center, RWTH Aachen University, Mathieustrasse 6, 52074 Aachen (Germany)

    2011-05-15

    Due to the liberalization of energy markets in the European Union, today's European utilities not only focus on electricity supply, but also offer exchange-traded 'structured products' or portfolio management for unbundling financial and physical risk positions. Many utilities are only able to provide these services in their domestic markets. In a globalized economy, the need for a centrally organized pan-European portfolio management has arisen, as it allows a simplified commodity sourcing in combination with an optimized risk management. In this paper, we examine the challenges to be overcome for establishing a European-wide bundling of electricity contracts. For this purpose, a case study based on the business perspective of RWE Supply and Trading in Central and Eastern Europe is carried out. In a first step, we analyze general requirements for a pan-European bundling of electricity contracts. Then, RWE's situation in Europe is examined, based on which we finally propose a concept to meet customer demands in Central and Eastern Europe. - Research highlights: {yields} Analysis of electricity market liberalization in Central and Eastern Europe. {yields} Identification of requirements and problems for pan-European bundling of contracts. {yields} Case study based on RWE Supply and Trading perspective in Central and Eastern Europe. {yields} Model development for pan-European unbundling of financial/physical risk positions.

  19. Two staged incentive contract focused on efficiency and innovation matching in critical chain project management

    Directory of Open Access Journals (Sweden)

    Min Zhang

    2014-09-01

    Full Text Available Purpose: The purpose of this paper is to define the relative optimal incentive contract to effectively encourage employees to improve work efficiency while actively implementing innovative behavior. Design/methodology/approach: This paper analyzes a two staged incentive contract coordinated with efficiency and innovation in Critical Chain Project Management using learning real options, based on principle-agent theory. The situational experiment is used to analyze the validity of the basic model. Finding: The two staged incentive scheme is more suitable for employees to create and implement learning real options, which will throw themselves into innovation process efficiently in Critical Chain Project Management. We prove that the combination of tolerance for early failure and reward for long-term success is effective in motivating innovation. Research limitations/implications: We do not include the individual characteristics of uncertain perception, which might affect the consistency of external validity. The basic model and the experiment design need to improve. Practical Implications: The project managers should pay closer attention to early innovation behavior and monitoring feedback of competition time in the implementation of Critical Chain Project Management. Originality/value: The central contribution of this paper is the theoretical and experimental analysis of incentive schemes for innovation in Critical Chain Project Management using the principal-agent theory, to encourage the completion of CCPM methods as well as imitative free-riding on the creative ideas of other members in the team.

  20. Management of government personal property in the hands of contractors. Handbook for contracting officers and staff

    Energy Technology Data Exchange (ETDEWEB)

    1982-04-01

    This manual is divided into three parts. Part One applies to the management of Government personal property within the Department of Energy in general terms. Part Two describes the specifics of the application of personal property management techniques to On-Site Contractors. Part three applies to Off-Site Contractors. Part One introduces the field of property management. It discusses: the legal basis and requirements established by Federal Statutes and the parallel authorities and responsibilities; the related evolution of the Department of Energy; the regulation system within the Federal Government and its implementation by the Department for personal property management. The life cycle of equipment is presented and how control over personal property is maintained through an accountability system. Classifications of property and contract clauses are discussed. The relationships of contracting officers and property administrators with contractors are presented in each of the discussions as appropriate. Part One consists of only one chapter and is applicable to the management of property utilized by all types of contractors. It provides the foundation to explore in some detail the actions and interactions that occur between the Department's procurement and property personnel and those of the contractor. This exploration in depth is made in Parts Two and Three.

  1. Lessons learned in implementing a demand side management contract at the Presidio of San Francisco

    Energy Technology Data Exchange (ETDEWEB)

    Sartor, D.; Munn, M.

    1998-06-01

    The National Park Service (NSP) recently completed the implementation phase of its Power Saving Partners (PSP) Demand Side Management (DSM) contract with the local utility, Pacific Gas and Electric (PG&E). Through the DSM contract, NPS will receive approximately $4.1 million over eight years in payment for saving 61 kW of electrical demand, 179,000 km of electricity per year, and 1.1 million therms of natural gas per year. These payments are for two projects: the installation of high-efficiency lighting systems at the Thoreau Center for Sustainability and the replacement of an old central boiler plant with new, distributed boilers. Although these savings and payments are substantial, the electrical savings and contract payments fall well short of the projected 1,700 kW of electrical demand, 8 million kwh of annual electricity savings, and $11 million in payments, anticipated at the project's onset. Natural gas savings exceeded the initial forecast of 800,000 therms per year. The DSM contract payments did not meet expectations for a variety of reasons which fall into two broad categories: first, many anticipated projects were not constructed, and second, some of the projects that were constructed were not included in the program because the cost of implementing the DSM program's measurement and verification (M&V) requirements outweighed anticipated payments. This paper discusses the projects implemented, and examines the decisions made to withdraw some of them from the DSM contract. It also presents the savings that were realized and documented through M&V efforts. Finally, it makes suggestions relative to M&V protocols to encourage all efficiency measures, not just those that are easy to measure.

  2. Report: Policies Needed for Proper Use and Management of Cost-Reimbursement Contracts Based on Duncan Hunter Act

    Science.gov (United States)

    Report #12-P-0320, March 6, 2012. EPA did not comply with several key revisions to the FAR as amended by the interim rule, Proper Use and Management of Cost Reimbursement Contracts (FAR Case 2008-030).

  3. Notification: Preliminary Research on the U.S. Chemical Safety and Hazard Investigation Board's Management of Contracts

    Science.gov (United States)

    June 3, 2013. The U.S. Environmental Protection Agency’s Office of Inspector General plans to begin preliminary research on the U.S. Chemical Safety and Hazard Investigation Board’s management of contracts.

  4. Long-term opioid contract use for chronic pain management in primary care practice. A five year experience.

    Science.gov (United States)

    Hariharan, Jaishree; Lamb, Geoffrey C; Neuner, Joan M

    2007-04-01

    The use of opioid medications to manage chronic pain is complex and challenging, especially in primary care settings. Medication contracts are increasingly being used to monitor patient adherence, but little is known about the long-term outcomes of such contracts. To describe the long-term outcomes of a medication contract agreement for patients receiving opioid medications in a primary care setting. Retrospective cohort study. All patients placed on a contract for opioid medication between 1998 and 2003 in an academic General Internal Medicine teaching clinic. Demographics, diagnoses, opiates prescribed, urine drug screens, and reasons for contract cancellation were recorded. The association of physician contract cancellation with patient factors and medication types were examined using the Chi-square test and multivariate logistic regression. A total of 330 patients constituting 4% of the clinic population were placed on contracts during the study period. Seventy percent were on indigent care programs. The majority had low back pain (38%) or fibromyalgia (23%). Contracts were discontinued in 37%. Only 17% were cancelled for substance abuse and noncompliance. Twenty percent discontinued contract voluntarily. Urine toxicology screens were obtained in 42% of patients of whom 38% were positive for illicit substances. Over 60% of patients adhered to the contract agreement for opioids with a median follow-up of 22.5 months. Our experience provides insight into establishing a systematic approach to opioid administration and monitoring in primary care practices. A more structured drug testing strategy is needed to identify nonadherent patients.

  5. A neuroprosthesis for tremor management through the control of muscle co-contraction.

    Science.gov (United States)

    Gallego, Juan Álvaro; Rocon, Eduardo; Belda-Lois, Juan Manuel; Pons, José Luis

    2013-04-15

    Pathological tremor is the most prevalent movement disorder. Current treatments do not attain a significant tremor reduction in a large proportion of patients, which makes tremor a major cause of loss of quality of life. For instance, according to some estimates, 65% of those suffering from upper limb tremor report serious difficulties during daily living. Therefore, novel forms for tremor management are required. Since muscles intrinsically behave as a low pass filter, and tremor frequency is above that of volitional movements, the authors envisioned the exploitation of these properties as a means of developing a novel treatment alternative. This treatment would rely on muscle co-contraction for tremor management, similarly to the strategy employed by the intact central nervous system to stabilize a limb during certain tasks. We implemented a neuroprosthesis that regulated the level of muscle co-contraction by injecting current at a pair of antagonists through transcutaneous neurostimulation. Co-contraction was adapted to the instantaneous parameters of tremor, which were estimated from the raw recordings of a pair of solid state gyroscopes with a purposely designed adaptive algorithm. For the experimental validation, we enrolled six patients suffering from parkinsonian or essential tremor of different severity, and evaluated the effect of the neuroprosthesis during standard tasks employed for neurological examination. The neuroprosthesis attained significant attenuation of tremor (pneuroprosthesis, although there was a subtle trend towards larger attenuation of more severe tremors. Tremor frequency was not altered during neurostimulation, as expected from the central origin of Parkinson's disease and essential tremor. All patients showed a good tolerance to neurostimulation in terms of comfort and absence of pain, and some spontaneously reported that they felt that tremor was reduced when the neuroprosthesis was activated. The results presented herein demonstrate

  6. Office of River Protection (RPP) Interface Management in the Multi Contract Project Environment at Hanford

    Energy Technology Data Exchange (ETDEWEB)

    SHIKASHIO, L.A.

    2000-09-22

    The Office of River Protection (ORP) is implementing the River Protection Project (RPP) using two prime contractors. CH2M Hill Hanford Group, Inc. (CHG) is responsible for operating the existing tank system, delivering the waste feed to the waste treatment plant, and managing the resulting low- and high-level glass waste ''product'' through a performance-based fee type contract. A separate prime contractor will be responsible for designing, constructing and commissioning of a new Waste Treatment and Immobilization Plant (WTP), and preparing the waste for ultimate disposal. In addition to the prime contractors and their interfaces, the River Protection Project is being conducted on the Hanford Site, which is under the management of another DOE organization, DOE Richland Field Office (DOE-RL). The infrastructure and utilities are provided by DOE-RL, for example. In addition, there are multiple other technical interfaces with federal, state and other regulatory agencies that influence the management of the activities. This paper provides an overview of the approach employed by ORP to identify, coordinate, and manage the technical interfaces of RPP. In addition, this paper describes the approach and methodologies used to: Establish an overall framework for interface management. Establish the requirements for defining and managing interfaces for the prime contractors and DOE. Contractually requiring the prime contractors to control and manage the interfaces.

  7. Coalition contract management as a systems change strategy for HIV prevention.

    Science.gov (United States)

    Darrow, William W; Montanea, Julie E; Sánchez-Braña, Elizabeth

    2010-11-01

    Racial and Ethnic Approaches to Community Health (REACH) 2010 provided a unique opportunity for minority community-based organizations (CBOs) to work together to eliminate disparities in HIV disease. A coalition was formed in Broward County to respond to the REACH 2010 program announcement, a university was chosen to coordinate efforts, and contracts were negotiated with CBO partners to develop, implement, and evaluate a community action plan. Contract management provided stability, focus, and a mechanism for coalition partners to measure progress toward achieving project objectives. By emphasizing documentation as well as the delivery of services, however, contract conditions also placed a heavy burden on educational outreach workers, restricted the reimbursable activities of member organizations, and created friction between minority agencies and university staff. Although the coalition met many of its objectives, the introduction and enforcement of a mutually agreed on set of rules and obligations as a way of promoting systems change in Broward County failed to make a lasting impact among community partners. CBOs continued to compete with one another for HIV prevention project funding and stopped collaborating as closely with another when federal support for our REACH 2010 community demonstration project ran out.

  8. Evaluation of the Contract Management Process in the United Nations for Acquiring Peacekeeping Operations/Services

    Science.gov (United States)

    2007-06-01

    financing.html (October 2006). 17 United Nations, www.un.org, http://www.un.org/Depts/ dhl /resguide/specpk.htm#genfin (October 2006). 24 as the ceiling which...It also intended to help benchmark a country’s contract management strength and assess areas for improvement. The CMMM adapted for this study...Depts/ dhl /resguide/specpk.htm#genfin. United Nations. (2006, October) Retrieved October 2006 from www.un.org, http://www.un.org/Depts/dpko/dpko

  9. Contract-Based Transaction Management in Cross-Organizational Workflow Management

    NARCIS (Netherlands)

    Grefen, P.W.P.J.

    Cross-organizational workflow management is an essential ingredient for process integration in virtual enterprises. To obtain cross-organizational workflow processes with robust semantics, these processes should be supported by highlevel cross-organizational transaction management. In this context,

  10. Learning in a self-managed management career : the relation between managers' HRD-patterns, psychological career contracts and mobility perpectives

    NARCIS (Netherlands)

    Lankhuijzen, E.S.K.

    2002-01-01

    This thesis focuses on the significance of managers HRD-activities (learning activities) in modern career contexts. Based on literature study and several pre-studies, a conceptual research model was developed containing three main elements: HRD-pattern, psychological career contract and mobility

  11. A question of systematics. Contract management in power plant projects; Eine Frage der Systematik. Vertragsmanagement bei Kraftwerksprojekten

    Energy Technology Data Exchange (ETDEWEB)

    Heinlein, B.C. [Sozietaet Clifford Chance, Duesseldorf (Germany)

    2005-07-01

    The realisation of power plant projects is - also from a legal point of view - a demanding task. Before construction works can start, public authorisations must be obtained. Further, a number of different contracts must be concluded, which often mutually depend on each other. As regards the negotiation and conclusion of the different contracts it is not only necessary to resolve questions regarding the content of each individual contract but also to follow a certain chronological order. In particular, outside financing will only be successful, if the most important contracts as regards the project have been signed or have been negotiated for their bigger part. The following article gives an overview over the basic aspects of contract management in power plant projects. (orig.)

  12. The evolving local social contract for managing climate and disaster risk in Vietnam.

    Science.gov (United States)

    Christoplos, Ian; Ngoan, Le Duc; Sen, Le Thi Hoa; Huong, Nguyen Thi Thanh; Lindegaard, Lily Salloum

    2017-07-01

    How do disasters shape local government legitimacy in relation to managing climate- and disaster-related risks? This paper looks at how local authorities in Central Vietnam perceive their social contract for risk reduction, including the partial merging of responsibilities for disaster risk management with new plans for and investments in climate change adaptation and broader socioeconomic development. The findings indicate that extreme floods and storms constitute critical junctures that stimulate genuine institutional change. Local officials are proud of their strengthened role in disaster response and they are eager to boost investment in infrastructure. They have struggled to reinforce their legitimacy among their constituents, but given the shifting roles of the state, private sector, and civil society, and the undiminished emphasis on high-risk development models, their responsibilities for responding to emerging climate change scenarios are increasingly nebulous. The past basis for legitimacy is no longer valid, but tomorrow's social contract is not yet defined. © 2017 The Author(s). Disasters © Overseas Development Institute, 2017.

  13. CVal: a spreadsheet tool to evaluate the direct benefits and costs of carbon sequestration contracts for managed forests

    Science.gov (United States)

    E.M. Bilek; Peter Becker; Tim. McAbee

    2009-01-01

    This documentation is meant to accompany CVal, a downloadable spreadsheet tool. CVal was constructed for foresters, other land management advisors, landowners, and carbon credit aggregators to evaluate the direct benefits and costs of entering into contracts for carbon sequestered in managed forests and forest plantations. CVal was designed to evaluate Exchange...

  14. Management practices and performance of mergers and acquisitions in Pakistan: mediating role of psychological contract.

    Science.gov (United States)

    Bari, Muhammad Waseem; Fanchen, Meng; Baloch, Muhammad Awais

    2016-01-01

    The objective of this study is to examine the direct and indirect effect of management practices (procedural justice, coordination approach, communication system, integration strategy, and coping programs) on merger and acquisition (M&A) performance in the Pakistan banking industry. Psychological contract (PC) acts as a mediator between Management practices and M&A performance. The Present study distributes a structured questionnaire to 700 bank employees of different management cadres. The useful response rate is 76 % (536 employees). It uses PLS-SEM technique for data analysis. (1) procedural justice is a key strategy which has highly significant direct and indirect effect on M&A performance; however integration strategy and the communication system have an only direct effect. (2) PC performs partial mediation at different levels between management practices and M&A financial and non-financial performance. This study provides an effective solution to solve the soft issues during and post-M&A process. This is one of the few studies which effectively integrate the five constructs into a single framework to study their effects on M&A performance. Limitations and future research directions are presented in the last section of the study.

  15. Change management of mergers: the impact on NHS staff and their psychological contracts.

    Science.gov (United States)

    Cortvriend, Penny

    2004-08-01

    The NHS has experienced a significant amount of organisational change and restructuring, which has included numerous mergers and de-mergers, since the Labour party came to power in the UK in 1997. However, to date there has been little in the way of evaluation of such changes, particularly the impact of organisational restructuring on the staff involved. This paper examines the human aspect of a merger, and subsequent de-merger, within a primary care trust (PCT) in the North of England, using a focus group methodology. The findings demonstrate that leadership and management styles have a significant impact on staff experiencing such changes. In addition, the psychological contract can be damaged due to the impact of several factors, inducing exit or intention to leave. Employees experienced a constant cycle of change with little time for stabilisation or adjustment, leading to negativity and lowered motivation at times.

  16. Managing Projects with the Public, -bringing Partnering, Contracts and Financing together in Building Public Services

    DEFF Research Database (Denmark)

    Koch, Christian

    2004-01-01

    of opportunity shows that on the operational level the contractual, financial and skill basis for the project has to be mobilized, negotiated, partly stabilized and renegotiated. The participating actors thus have to develop a new set of skills in dealing with municipalities and managing operations in PPPs....... of projects have had trouble to develop. The paper views PPP as an interaction between an emergent governance frame and operational activities in the project. PPP is an element of a networked public sector and the paper takes a network and political process approach to the shaping of PPP in Denmark....... It is analysed how the governance frame for these type of projects constituted a window of opportunity in the late nineties for “sale and lease back” arrangements, combined with partnering and more traditional design-build contracts. A case of a municipality renewing its school services, exploiting this window...

  17. A comparative analysis of quality management standards for contract research organisations in clinical trials.

    Science.gov (United States)

    Murray, Elizabeth; McAdam, Rodney

    2007-01-01

    This article compares and contrasts the main quality standards in the highly regulated pharmaceutical industry with specific focus on Good Clinical Practice (GCP), the standard for designing, conducting, recording and reporting clinical trials involving human participants. Comparison is made to ISO quality standards, which can be applied to all industries and types of organisation. The study is then narrowed to that of contract research organisations (CROs) involved in the conduct of clinical trials. The paper concludes that the ISO 9000 series of quality standards can act as a company-wide framework for quality management within such organisations by helping to direct quality efforts on a long-term basis without any loss of compliance. This study is valuable because comparative analysis in this domain is uncommon.

  18. FIDIC contracts: analysis of the impact of general and particular conditions on the financial risk management in Romanian infrastructure projects

    Directory of Open Access Journals (Sweden)

    Constanţa-Nicoleta Bodea

    2016-12-01

    Full Text Available Construction projects are characterized by risks and uncertainties mainly due to technical and economic complexity. Risk management is an important tool in making decisions involving the identification and reduction, avoidance or transfer risk and uncertainties consequences of events that occurs during project implementation. For this reason, the objective of the contract between the beneficiary and the contractor is the allocation of risk. The distribution of risk in contracts for the execution of construction works was and is an ongoing challenge faced by parties having a significant impact on the type of contract is used. On the one hand, the beneficiaries tend to transfer to the contractors as many of the project risks and uncertainties, on the other hand, the contractors look to exploit any weakness contract, so as to reduce their impact on the expected profit. One of the most important risks assumed by the contractor by signing the contract which is also increasingly common in the current economic situation is the reduced financial capacity to support the project. A purely legal or purely technical interpretation is not meant to describe the complexity of issues related to implementation of construction projects. For this reason the authors have adopted a multi-disciplinary approach, which includes the legal issues related to the nature of the contract, but also the financial and technical aspects of construction projects. The paper aims to analyze how special contract clauses can influence the implementation of construction projects and in particular the financial management of contractors. The authors propose a model for analyzing the impact of FIDIC contract conditions applied on a case study of five transport infrastructure projects.

  19. Managing urban wastewater in China: a survey of build-operate-transfer contracts

    NARCIS (Netherlands)

    Braadbaart, O.D.; Zhang, M.S.; Wang, Y.

    2009-01-01

    This paper reports on a nationwide field survey of wastewater plants under build-operate-transfer ( BOT) contracts in China. The survey yielded information on contracting parties, size, duration and location of 37 BOT contracts. The key findings are that municipal governments feature as first

  20. Payment contracts in a preventive health care system: a perspective from operations management.

    Science.gov (United States)

    Yaesoubi, Reza; Roberts, Stephen D

    2011-12-01

    We consider a health care system consisting of two noncooperative parties: a health purchaser (payer) and a health provider, where the interaction between the two parties is governed by a payment contract. We determine the contracts that coordinate the health purchaser-health provider relationship; i.e. the contracts that maximize the population's welfare while allowing each entity to optimize its own objective function. We show that under certain conditions (1) when the number of customers for a preventive medical intervention is verifiable, there exists a gate-keeping contract and a set of concave piecewise linear contracts that coordinate the system, and (2) when the number of customers is not verifiable, there exists a contract of bounded linear form and a set of incentive-feasible concave piecewise linear contracts that coordinate the system. Copyright © 2011 Elsevier B.V. All rights reserved.

  1. Quality standards and incentives in managed care organizations' specialty contracts for behavioral health.

    Science.gov (United States)

    Hodgkin, Dominic; Horgan, Constance M; Garnick, Deborah W; Merrick, Elizabeth L

    2002-06-01

    In the US, most privately insured individuals are enrolled with managed care organizations (MCOs), and a majority of these organizations have subcontracted responsibility for behavioral health care to specialized vendors. Based on economic theory, we anticipate that MCOs should be more likely to require quality standards in contracts that transfer all financial risk to the vendor. To test whether use of quality standards in behavioral health subcontracts differs between MCOs that transfer full financial risk and other MCOs. Similarly, to test for differences between for-profit and nonprofit MCOs. Bivariate tests and logistic regression analysis of the use of five quality-related standards, and the use of any standard, in a nationally representative sample of commercial MCO products in 60 US market areas. Statistical controls include MCO size, chain affiliation, region and market size. All five standards we examined were widely used in behavioral health subcontracts (varying from 47% to 70% of products). However, contrary to our hypothesis, the standards are not more commonly used by MCO products with unlimited capitated contracts for behavioral health. In most cases the opposite is true. In addition, for-profit plans were more rather than less likely to use several of the standards. MCOs that transfer full risk may be using mechanisms other than quality standards (e.g. periodic rebidding) to prevent skimping; may be less concerned about quality anyway; or may be more skeptical about the value of existing standards. The fact that for-profit plans are equally or more likely to use these standards may reveal that their objectives are not different from those of nonprofits, or that competition is constraining them to adopt standards anyway. Limitations of this study include the lack of more detailed data on the nature of financial risk-sharing, and on the types of financial penalties associated with each standard. Pressure for accreditation appears to be an effective

  2. Identifying and Managing Premature Ventricular Contraction-Induced Cardiomyopathy: What, Why, and How?

    Science.gov (United States)

    Alqarawi, Wael A; Ramirez, F Daniel; Nery, Pablo B; Redpath, Calum J; Sadek, Mouhannad M; Green, Martin S; Birnie, David H; Nair, Girish M

    2017-02-01

    Premature ventricular contraction (PVC)-induced cardiomyopathy is increasingly being recognized as a reversible cause of left ventricular (LV) systolic dysfunction (LVSD). The diagnosis of PVC-induced cardiomyopathy is considered in subjects with high PVC burdens (> 10,000 per 24 hours) after excluding other known causes of LVSD. PVC suppression is the mainstay of the management of PVC-induced cardiomyopathy, in addition to proven evidence-based medical therapy recommended for subjects with LVSD. Management strategies for PVC-induced cardiomyopathy include medical therapy and/or catheter ablation, with an increasing role for catheter ablation as a first-line therapy in view of the potential for permanent suppression of PVCs. Recovery of LVSD is typically a gradual process over months after effective suppression of PVCs. Last, asymptomatic patients with high PVC burdens and preserved LV systolic function appear to be at low risk over the intermediate term for developing LVSD. However, it is prudent to monitor LV function periodically because of the potential for deterioration of LV function observed during long-term follow-up in some subjects. Copyright © 2016 Canadian Cardiovascular Society. Published by Elsevier Inc. All rights reserved.

  3. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Energy Technology Data Exchange (ETDEWEB)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  4. Moderating effects of leader-member exchange (LMX) on job burnout in dietitians and chefs of institutional foodservice

    National Research Council Canada - National Science Library

    Kyung-Eun Lee

    2011-01-01

    .... Hypotheses were proposed based on the Job Demands-Resources model and LMX theory. The study population consisted of dietitians and chefs who were in charge of managing unit operations in a nationwide contract management company...

  5. Virtual Leadership: The Influence of Transformational Leadership Style on Employee Satisfaction at the Defense Contract Management Agency

    Science.gov (United States)

    Johnson, Kevin A.

    2012-01-01

    The purpose of this quantitative correlational study was to examine the possible relationship between transformational leadership style behaviors and the influence it had on employee satisfaction. The information presented in this study involved virtual team members at the Defense Contract Management Agency, Navy Special Emphasis Operations. The…

  6. Contracts and Management Services FY 1996 Site Support Program Plan: WBS 6.10.14. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Knoll, J.M. Jr.

    1995-09-01

    This is the Contracts and Management Services site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail including cost accounting narrative summary, approved funding budget, and activity detailed description.

  7. Internal management contracts within the context of the Humanization Policy: experimenting with methodology within the reference frame of co-management

    Directory of Open Access Journals (Sweden)

    Serafim Barbosa Santos Filho

    2008-01-01

    Full Text Available This paper describes the experience of implementing internal management contracts in a public hospital. These contracts were understood as tools within the context of co-management and, within the perspective of humanization, as interventions in healthcare and management practices. With this focus, the methodological lines of the collective construction of such contracts and the indicators for the implementation process are presented. Through the process of agreed targets and participative evaluation, the following results were observed: in addition to increasing the institutional efficiency and effectiveness, the effects unleashed through these tools revealed their potential for transforming the work relationships, promoting co-responsibility between subjects and teams, adding value to workers and forming commitment networks for improved care.

  8. The Relationship between McGregor's X-Y Theory Management Style and Fulfillment of Psychological Contract: A Literature Review

    OpenAIRE

    Ramesh Kumar Moona Haji Mohamed; Che Supian Mohamad Nor

    2013-01-01

    The purpose of this paper is to trace McGregor’s X-Y theory and its relationship with fulfillment of psychological contract. This is a review article relying on literature reviews and synthesizing concepts and ideas from related sources. McGregor’s X-Y theory is a natural rule for managing people. McGregor’s ideas suggest that there are two fundamental approaches to managing people. Theory X management style generally get poor results compare with managers use theory Y, which produces better ...

  9. Commitments of Psychological Contracts and Diagnostic Use of Management Control Systems

    Directory of Open Access Journals (Sweden)

    Ivan Canan

    2016-06-01

    Full Text Available Investigating the commitments the Surveillance Agents from the National Telecommunications Agency (Anatel made in their psychological contracts and the diagnostic use of the management control system of the entity, this study tested the hypothesis that individuals tend to be more committed to aspects they are charged for within organizations. This is a theoretical and empirical study that assumed that the commitments comprise the part of the belief that individuals develop on reciprocal relations of exchange between themselves and their contractors, in line with the model by Rousseau (1989; 1995. It was also assumed that the extent to which aspects are charged from the members of an organization matches their perception of the diagnostic use of formal and informal control systems. Methodologically, the research was developed in two phases, the first qualitative, involving documentary analysis and content analysis of organizational documents; and the second quantitative, with the application of questionnaires answered by individuals who occupy the individual position referred to in the organization, who evaluated behavioral parameters that act on them and that were identified in the first phase. The data showed that 42 respondents tend to maintain high levels of commitment to the rules and standards proposed for their function. Statistical results also suggest that there is a significant positive correlation between the commitments assumed and the perceived diagnostic use of control systems for the surveillance agents who answered the questionnaire.

  10. Use of Visuals for Food Safety Education of Spanish-Speaking Foodservice Workers: A Case Study in Iowa

    Science.gov (United States)

    Rajagopal, Lakshman

    2012-01-01

    Providing food safety training to an audience whose native language is not English is always a challenge. In the study reported here, minimal-text visuals in Spanish were used to train Hispanic foodservice workers about proper handwashing technique and glove use based on the 2005 Food Code requirements. Overall, results indicated that visuals…

  11. Using student opinion and design inputs to develop an informed university foodservice menu.

    Science.gov (United States)

    Feldman, Charles; Harwell, Heather; Brusca, Joseph

    2013-10-01

    The potential for Universities and Colleges to be settings that promote health and wellbeing has become the subject for debate where the role of foodservice has been acknowledged as influential. The aim of this research was to evaluate an effective design to promote healthy selections from university foodservice menus. The research was designed around a grounded theory approach utilizing semiological prompts based on different existing nutrition labeling schemes. A total of 39 students (17 male, 22 female) participated in seven focus groups at Montclair State University, US. The participants of this study clearly called for nutrition labeling on college menus and a prototype design had been agreed. The students also itemized five nutrients they wanted listed in a Traffic Light system of colors and then quantified on the menu: calories, sodium, sugar, fat and carbohydrates, plus beneficial ingredients or nutrients for display in menu icons. The nutrients and display order varies somewhat from industry and government standards, though the student recommendations are suggestive of common understandings of published nutrient guidelines. Students have a stake in how menu information is presented on campus and their opinions could positively impact the general selection of healthy foods. Copyright © 2013 Elsevier Ltd. All rights reserved.

  12. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  13. HACCP and food hygiene in hospitals: knowledge, attitudes, and practices of food-services staff in Calabria, Italy. Collaborative Group.

    Science.gov (United States)

    Angelillo, I F; Viggiani, N M; Greco, R M; Rito, D

    2001-06-01

    To determine adherence to Hazard Analysis and Critical Control Points (HACCP) methods and to evaluate knowledge, attitudes, and practices of food-services staff with regard to food hygiene in hospitals. A survey. Hospital medical directors and food-services staff of 36 hospitals in Calabria, Italy. A questionnaire about hospital characteristics, food-services organization, and measures and procedures for the control and prevention of foodborne diseases was sent to medical directors; a questionnaire about demographic and practice characteristics, knowledge, attitudes, and behaviors about control and prevention of foodborne diseases was sent to food-services staff. Multiple logistic regression analysis was performed. Only 54% of the 27 responding hospitals were using the HACCP system and, of those using HACCP, 79% adopted a food-hygiene-practice manual; more than one half already had developed written procedures for food storage, personal hygiene, cleaning and disinfection; one half or less performed microbiological assessment of foods and surfaces. Of the 290 food-services staff who responded, 78.8% were aware of the five leading foodborne pathogens; this knowledge was significantly higher among those with a higher educational level and those who worked in hospitals that had implemented the HACCP system. Younger staff and those who had attended continuing educational courses about food hygiene and hospital foodborne diseases had a significantly higher knowledge of safe temperatures for food storage. A positive attitude toward foodborne-diseases prevention was reported by the great majority, and it was significantly higher in older respondents and in those working in hospitals with a lower number of beds. Only 54.9% of those involved in touching or serving unwrapped raw or cooked foods routinely used gloves during this activity; this practice was significantly greater among younger respondents and in those working in hospitals using HACCP. Full implementation of the

  14. Improved water allocation utilizing probabilistic climate forecasts: Short-term water contracts in a risk management framework

    Science.gov (United States)

    Sankarasubramanian, A.; Lall, Upmanu; Souza Filho, Francisco Assis; Sharma, Ashish

    2009-11-01

    Probabilistic, seasonal to interannual streamflow forecasts are becoming increasingly available as the ability to model climate teleconnections is improving. However, water managers and practitioners have been slow to adopt such products, citing concerns with forecast skill. Essentially, a management risk is perceived in "gambling" with operations using a probabilistic forecast, while a system failure upon following existing operating policies is "protected" by the official rules or guidebook. In the presence of a prescribed system of prior allocation of releases under different storage or water availability conditions, the manager has little incentive to change. Innovation in allocation and operation is hence key to improved risk management using such forecasts. A participatory water allocation process that can effectively use probabilistic forecasts as part of an adaptive management strategy is introduced here. Users can express their demand for water through statements that cover the quantity needed at a particular reliability, the temporal distribution of the "allocation," the associated willingness to pay, and compensation in the event of contract nonperformance. The water manager then assesses feasible allocations using the probabilistic forecast that try to meet these criteria across all users. An iterative process between users and water manager could be used to formalize a set of short-term contracts that represent the resulting prioritized water allocation strategy over the operating period for which the forecast was issued. These contracts can be used to allocate water each year/season beyond long-term contracts that may have precedence. Thus, integrated supply and demand management can be achieved. In this paper, a single period multiuser optimization model that can support such an allocation process is presented. The application of this conceptual model is explored using data for the Jaguaribe Metropolitan Hydro System in Ceara, Brazil. The performance

  15. National beef tenderness survey - 2006: Assessment of Warner-Bratzler shear and sensory panel ratings for beef from US retail and foodservice establishments.

    Science.gov (United States)

    Voges, K L; Mason, C L; Brooks, J C; Delmore, R J; Griffin, D B; Hale, D S; Henning, W R; Johnson, D D; Lorenzen, C L; Maddock, R J; Miller, R K; Morgan, J B; Baird, B E; Gwartney, B L; Savell, J W

    2007-11-01

    Beef from retail and foodservice establishments in 11 US cities was evaluated using Warner-Bratzler shear (WBS) and consumer evaluation panels. Postmortem aging times ranged from 3 to 83d for retail and 7 to 136d for foodservice with mean aging times of 22.6d and 30.1d, respectively. For retail, the three cuts from the round - top round, bottom round, and eye of round - had the highest (P<0.05) WBS values compared to cuts from the chuck, rib, and loin. Top loin steaks had the lowest (P<0.05) WBS value compared to ribeye and top sirloin foodservice steaks. Retail bone-in top loin, top loin, ribeye, T-bone, and porterhouse received the highest (P<0.05) ratings by consumers for overall like and like tenderness. Quality grade had little or no effect on foodservice sensory evaluations. Improvements in round tenderness are needed to increase consumer acceptability.

  16. Contracting for Public Services

    DEFF Research Database (Denmark)

    Greve, Carsten

    strategic purchasing understanding markets communicating the contracting decision designing and drafting the contract the role of the consumer the regulation of service provision Illustrated throughout with practitioner case-studies from a range of OECD countries, this book presents an important new...... theoretical ‘contract management model' and a ‘mature contract model', and explores the mechanisms, formal rules and informal norms that influence the way governments contract for public services. This book is essential reading for all students of public management and all public service managers....

  17. Professional services contract manager development and certification strategy : spr 696 : final report.

    Science.gov (United States)

    2013-02-27

    SCDOT hires many consultants to provide professional services in support of its planning, design, construction and : maintenance projects. SCDOT personnel responsible for procuring and administering these professional service : contracts, especially ...

  18. Construction Management Module: Contingency Contracting Synergistic Approach Integrating Joint Capabilities for USSOCOM

    Science.gov (United States)

    2010-01-29

    PRT Provisional Reconstruction Team PVO Private Volunteer Organizations QAE Quality Assurance Evaluator QAP Quality Assurance Personnel QDR...operations. Other names include: contracting officers technical representative (COTR), or quality assurance personnel/evaluator ( QAP /E) (used most often

  19. Managing the efficiency of foreign engineering contracts: A study of a Norwegian and South Korean project interface

    OpenAIRE

    Ahn, Byungmu

    2015-01-01

    Master's thesis in Offshore technology: industrial asset management *Please contact the author at for the updated/further developed version of the thesis.* Oil & gas exploration and production industry in North Sea has greatly been challenged over the last decade with increasing cost profiles. This condition, together with relatively low oil price has begun to squeeze the commercial margins of a large number of assets. Foreign engineering contracts have become a com...

  20. The Relationship between Human Resource Management Practices, Leader member exchange, Psychological contract Fulfillment, Trade Union and Employee Retention Behaviour

    OpenAIRE

    Ramesh Kumar Moona Haji Mohamed; Che Supian Mohamad Nor; Norziani Dahalan

    2014-01-01

    Employee retention is an issue facing most of corporate leaders due to high turnover rate. Many researchers have found that retaining employees is a significant challenge for organization as different employees are motivated by different retention strategies. A good human resource management practices would be one of the retention strategies. Human resource practices are also proposed as one of the most potent factors determining the nature and state of the psychological contract and leader m...

  1. Using the Systems-Practice Framework to Understand Food Allergen Management Practices at College Catering Operations: A Qualitative Study.

    Science.gov (United States)

    Verstappen, Jennie; Mirosa, Miranda; Thomson, Carla

    2017-07-06

    The number of individuals with food allergies or intolerances attending catered university residential colleges is increasing, and safe dining options are required to minimize the risk of allergic reactions and food-induced death. This qualitative research study sought to advance professional knowledge of the factors affecting allergen management practices, particularly pertaining to college foodservices. Three catered residential colleges affiliated with a major university in New Zealand were selected as research sites. The study used an ethnographic approach and systems-practice theory as a framework for data collection and organizing results. Data collection techniques included document analyses (3 hours per site), observations (6 to 8 hours per site), focus groups with foodservice workers (30 to 45 minutes per site, n=16), and interviews with foodservice managers (45 to 90 minutes per interview, n=5). Notes and transcripts were coded through the process of thematic analysis using NVivo for Mac software, version 11.1.1, to identify factors affecting allergen management practices. The main factors affecting allergen management practices at college foodservices included information provided by residents about dietary requirements; communication between residents and foodservice staff; systems for allergen management; attitude of foodservice staff; and college size. Detailed dietary information, effective communication with residents, sufficient resources, clarification of responsibilities, and thorough systems are required for staff to perform safe allergen management practices. Ultimately, successful implementation was predominantly determined by staff attitude. Foodservice managers are advised to identify motivators and address barriers of staff attitudes toward allergen management practices to promote successful implementation. Copyright © 2017 Academy of Nutrition and Dietetics. Published by Elsevier Inc. All rights reserved.

  2. Army Contract Writing System (ACWS)

    Science.gov (United States)

    2016-03-01

    2016 Major Automated Information System Annual Report Army Contract Writing System (ACWS) Defense Acquisition Management Information Retrieval...Program Information Program Name Army Contract Writing System (ACWS) DoD Component Army Responsible Office Program Manager References MAIS...UNCLASSIFIED 4 Program Description The Army Contract Writing System (ACWS) will be the Army’s single, next-generation, enterprise-wide contract writing

  3. Microbiological evaluation of foodservice contact surfaces in Iowa assisted-living facilities.

    Science.gov (United States)

    Sneed, Jeannie; Strohbehn, Catherine; Gilmore, Shirley A; Mendonca, Aubrey

    2004-11-01

    A study of 40 assisted-living facilities in Iowa was conducted to assess the microbiological quality of food-contact surfaces (work tables/counters, cooking equipment such as mixing bowls, and cutting boards) and a surface that could cross-contaminate food (refrigerator or freezer handles) to determine the effectiveness of cleaning and sanitation. Standards were set for foodservice for aerobic plate count, Enterobacteriaceae, and Staphylococcus aureus . Two facilities met standards for all five surfaces for each of the three tests. Fewer facilities met the standard for aerobic plate count than for the other two tests, and nearly three fourths of the facilities failed to meet the aerobic plate count for cutting boards. Critically, cross-contamination from these surfaces could result in contamination of food; thus, attention needs to be given to training and supervision to ensure proper hand washing and appropriate cleaning and sanitation procedures to reduce or eliminate cross-contamination.

  4. The relationship between emotions and food consumption (macronutrient) in a foodservice college setting - a preliminary study.

    Science.gov (United States)

    Hartwell, Heather J; Edwards, John S A; Brown, Lorraine

    2013-05-01

    Many aspects of eating out have been studied, yet emotions remain an under-researched area, despite having been shown to play a significant role in food consumption. The aim of this research is to critically evaluate the relationship between emotions and food consumption (macronutrient) in a realistic eating environment, a college cafeteria. Subjects (n = 408), diners using a cafeteria, completed an emotions questionnaire before and after freely choosing, paying for and consuming a hot main meal. The results demonstrated a greater feeling of contentment with a high fat, high energy meal, whereas with a low carbohydrate meal, participants felt unfulfilled. In addition, a high protein meal also leads to a feeling of contentment. These results are rather counter-intuitive to public health nutrition policy but indicate the importance of inclusion of a protein or high carbohydrate item in any dish design in a foodservice setting.

  5. Hospital food service: a comparative analysis of two foodservice systems at a Danish Hospital

    DEFF Research Database (Denmark)

    Justesen, Lise; René, Michael; Kristensen, Marianne Boll

    2016-01-01

    % of the protein requirements on CCP compared to 33 % on BTS (p=0,216). Conclusions A new foodservice system (CCP) which increases availability and choice of food 24/7 does not show a significant improvement of energy and protein intake in hospitalized patients and patients at nutritional risk. However, further......Background Insufficient dietary intake is common among hospitalised patients and may affect prognosis negatively. Hence hospital meals are central in the treatment, and their efficacy in ensuring adequate intake is crucial. This study aimed to compare patients’ dietary intake from a cook......-serve buffet-trolley serving system (BTS) to a new cook-chill pre-plated concept (CCP) allowing patients to choose from a static menu 24/7. Methods A quasi-experimental study was conducted at two orthopaedic surgical and a gynaecological surgical ward at a Danish Hospital. 57patients (≥3 days) were served...

  6. Store-Assistance Management for a Supply Chain with Consumer Return under Consignment Contract

    Directory of Open Access Journals (Sweden)

    Zhihui Wu

    2017-01-01

    Full Text Available In this paper, the strategy problems of pricing and store-assistance service investment are investigated for a supply chain with consumer return, where the considered supply chain under consignment contract consists of a single manufacturer and a single retailer. Firstly, we use differential equation to model the evolution of store-assistance service level and depict the effect of store-assistance service level on the return rate. By applying two-stage game, both optimal pricing and store-assistance service strategies are obtained based on the presented optimal control model. Subsequently, the committed dynamic consignment price contract is designed to coordinate and improve the performance of supply chain. Finally, a numerical example is provided to illustrate the impacts of the effectiveness of store-assistance service level and decay rate on the feasible region of corresponding contract.

  7. A Story of Three Bank-Regulatory Legal Systems: Contract, Financial Management Regulation and Fiduciary Law

    Directory of Open Access Journals (Sweden)

    Tamar Frankel

    2016-08-01

    Full Text Available How should banks be regulated to avoid their failure? Banks must control the risks they take with depositors' money. If depositors lose their trust in their banks, and demand their money, the banks will fail. This article describes three legal bank regulatory systems: Contract with depositors (U.S.; a mix of contract and trust law, but going towards trust (Japan and a full trust-fiduciary law regulating banks (Israel. The article concludes that bank regulation, which limits the banks' risks and conflicts of interest, helps create trustworthy banks that serve their country best.

  8. The role of psychological contract on employee commitment and organisational citizenship behaviour: A study of Indonesian young entrepreneurs in management action

    National Research Council Canada - National Science Library

    Ade I Anggraeni; Christantius Dwiatmadja; Ahyar Yuniawan

    2017-01-01

    Orientation: This study aims to analyse the entrepreneurship-driven reasons and characteristics of employee management of the young generation, by analysing the role of psychological contract on employee...

  9. Management Control of Market Transactions: The Relation Between Transaction Characteristics, Incomplete Contract Design and Subsequent Performance

    NARCIS (Netherlands)

    Anderson, S.W.; Dekker, H.C.

    2005-01-01

    Using an unusually comprehensive database on 858 transactions for information technology products and accompanying services, we study how close partners who are exposed to opportunistic hazards structure and control a significant transaction. We analyze data on the terms of contracting to determine

  10. Construction Management Module: Contingency Contracting Synergistic Approach Integrating Joint Capabilities for USSOCOM

    OpenAIRE

    Hearl, Christopher

    2010-01-01

    Sponsored Report (for Acquisition Research Program) Approved for public release; distribution unlimited. This project investigates the effectiveness of Contingency Contracting Officers (CCOs) in executing construction requirements within the United States Special Operations Command (USSOCOM) area of responsibility (AOR). The study provides recommendations to address identified weaknesses associated with a CCO''s ability to execute construction requirements for USSOCOM. One such recomm...

  11. Synergistic Approach Integrating Joint Capabilities for USSOCOM Contingency Contracting: Construction Management Module

    Science.gov (United States)

    2010-12-01

    Project Planning Officer xviii PRT Provisional Reconstruction Team PVO Private Volunteer Organizations QAE Quality Assurance Evaluator QAP ...assurance personnel/evaluator ( QAP /E) (used most often to refer to oversight of services contracts). A customer is responsible for nominating a subject

  12. Forest restoration and forest communities: Have local communities benefited from forest service contracting of ecosystem management?

    Science.gov (United States)

    Cassandra Moseley; Yolanda E. Reyes

    2008-01-01

    Conservation-based development programs have sought to create economic opportunities for people negatively affected by biological diversity protection. The USDA Forest Service, for example, developed policies and programs to create contracting opportunities for local communities to restore public lands to replace jobs lost from reduced timber harvest. This article...

  13. Understanding micro-processes of institutionalization: stewardship contracting and national forest management

    Science.gov (United States)

    Cassandra Moseley; Susan Charnley

    2014-01-01

    This paper examines micro-processes of institutionalization, using the case of stewardship contracting within the US Forest Service. Our basic premise is that, until a new policy becomes an everyday practice among local actors, it will not become institutionalized at the macro-scale. We find that micro-processes of institutionalization are driven by a mixture of large-...

  14. Where does foodborne illness happen-in the home, at foodservice, or elsewhere-and does it matter?

    Science.gov (United States)

    Jacob, C J; Powell, D A

    2009-11-01

    Foodservice professionals, politicians, and the media are often cited making claims as to which locations most often expose consumers to foodborne pathogens. Many times, it is implied that most foodborne illnesses originate from food consumed where dishes are prepared to order, such as restaurants or in private homes. The manner in which the question is posed and answered frequently reveals a speculative bias that either favors homemade or foodservice meals as the most common source of foodborne pathogens. Many answers have little or no scientific grounding, while others use data compiled by passive surveillance systems. Current surveillance systems focus on the place where food is consumed rather than the point where food is contaminated. Rather than focusing on the location of consumption-and blaming consumers and others-analysis of the steps leading to foodborne illness should center on the causes of contamination in a complex farm-to-fork food safety system.

  15. Contingency Contracting and the IT Manager: Today’s Challenges and Future Implications

    Science.gov (United States)

    2009-03-01

    This qualitative case study examines the relationship between Information Technology management and contractor management within the context of the...the chronological advances made in Information Technology management . Finally, the case study presents a description of the defense contingency along

  16. Changes in type of foodservice and dining room environment preferentially benefit institutionalized seniors with low body mass indexes.

    Science.gov (United States)

    Desai, Jyotika; Winter, Aaron; Young, Karen W H; Greenwood, Carol E

    2007-05-01

    To compare energy intakes in seniors with cognitive impairment residing in long-term care and receiving meals by bulk (cafeteria style with waitress service) vs traditional tray delivery systems and determine subject characteristics that identify responsiveness to type of foodservice provided. DESIGN AND SUBJECTS/SETTING: Usual energy intakes were compared in subjects residing in cognitive impairment units in either the old (tray delivery, n=23) or new (bulk delivery, n=26) nursing home at Baycrest, a teaching facility associated with University of Toronto Medical School. Changes to foodservice and physical environment (from institutional to more home-like environment). Twenty-one consecutive day investigator-weighed energy and macronutrient intakes and behavioral function (London Psychogeriatric Rating Scale). Analysis of variance determined mean differences in intake and regression analyses identified predictors of sensitivity to type of food delivery systems. Higher 24-hour total (P<0.001) and dinner (P<0.001) energy intakes in subjects receiving bulk compared to tray delivery were predominantly associated with greater carbohydrate intakes (P<0.001). Higher energy, carbohydrate, and protein, but not fat intakes, with bulk delivery were more apparent in individuals with lower body mass indexes (BMIs) (food delivery by BMI interaction, all P values <0.05). High-risk, cognitively impaired individuals with low BMI benefited the most from the changed foodservice and physical environment, whereas individuals with higher BMIs did not show substantive changes in intake. Bulk foodservice and a home-like dining environment optimize energy intake in individuals at high risk for malnutrition, particularly those with low BMIs and cognitive impairment.

  17. A conjoint analysis of landholder preferences for reward-based land-management contracts in Kapingazi watershed, Eastern Mount Kenya.

    Science.gov (United States)

    Balana, Bedru Babulo; Yatich, Thomas; Mäkelä, Miika

    2011-10-01

    Unsustainable land-use decisions and agricultural practices have become the key drivers of deteriorating watershed services in developing countries. However, landholders may have little or no incentives to take these impacts into account in their decision-making process. In recent years, reward-based provision of environmental services has emerged as an important market-based incentive for motivating landholders to adopt environmentally friendly land-use changes and agricultural practices. In this regard, for instance, the Pro-Poor Rewards for Environmental Services in Africa (PRESA) project has emerged as a large network to support and facilitate reward mechanisms in Africa. However, in many African rural settings, little is known about landholder attitudes and preferences related to the alternative land-management schemes. Using locally identified sets of six key land-management attributes, this paper applies conjoint methods to evaluate landholder preferences towards alternative land-management schemes aimed at enhancing the provision of watershed services in the River Kapingazi catchment in central Kenya. Data were collected from primary sources through focus groups and a questionnaire based conjoint survey. Three conjoint models were used; a traditional conjoint ratings model, a binary logit model, and an ordered logit model. Results from the focus groups indicated that shortage of water for both domestic use and irrigation was perceived as the most acute environmental problem in the area. Deforestation, poor river bank management and agricultural practices were identified as the major causes of the problem. Results from conjoint models show that the three principal attributes influencing landholder's ratings and probability of adopting the proposed land management options were 'size of land area to be committed', 'length of contract period', and 'granting or prohibiting rights to harvest environmental products from the committed land'. Thus, these attributes

  18. The effect of the new GMS contract on GP appointment provision in Wales: postal questionnaire survey of practice managers

    Directory of Open Access Journals (Sweden)

    Neal Richard D

    2008-11-01

    Full Text Available Abstract Background Access to health professionals is a key UK NHS priority, and meeting access targets is rewarded through the new General Medical Services (GMS contract in the UK. We sought to determine the current state of appointment provision in Wales and any changes resulting from the need to meet indicators in the new GMS contract. We undertook a postal questionnaire study of practice managers in all general practices in Wales. Findings Valid responses were received from 396/505 (78.4% practice managers. 361 (93.1% practices reported that they had achieved the target for 2004/05. 104 (26% practices reported that they were 100% open access/advanced access. The most frequent changes reported in response to the new GMS contract were offering more open or advanced access slots (237, 60%, more GP phone consultations (167, 42%, introducing a telephone triage system (100, 25%, introducing a minor illness clinic (76, 19%, and employing or training a nurse practitioner (59, 15%. 83% practice managers believed that patients were able to get an appointment at the time they need it either 'all of the time' or 'most of the time', and 70% that patients were able to get an appointment with the GP of choice either 'all of the time' or 'most of the time'. Conclusion This survey has demonstrated the current extent of appointment provision in Wales, and how changes have been driven by incentives. Whether these changes are in the best interests of either patients or doctors, or both, remains to be seen.

  19. Time and Materials Contracts: A Management Guide for Pre and Post Award

    Science.gov (United States)

    1994-06-01

    Svcs 2 Hazardous Waste Clean-up 2 Computer Software Development 1 Groundskeeping & Maintenance 1 Development & Providing of Training 1 Zero T & M Use 1...As of the date of the interview, no delivery orders were initiated against the IDTC for emergent clean-up services. 9. Computer Software Development & Grounds...would likely be candidates for current T & M contracts since other pricing mechanisms would be more appropriate. Specifically, computer software development would

  20. Store-Assistance Management for a Supply Chain with Consumer Return under Consignment Contract

    OpenAIRE

    Zhihui Wu; Dongyan Chen; Hui Yu

    2017-01-01

    In this paper, the strategy problems of pricing and store-assistance service investment are investigated for a supply chain with consumer return, where the considered supply chain under consignment contract consists of a single manufacturer and a single retailer. Firstly, we use differential equation to model the evolution of store-assistance service level and depict the effect of store-assistance service level on the return rate. By applying two-stage game, both optimal pricing and store-ass...

  1. Predicting Commitment Forms From Psychological Contract Breach ...

    African Journals Online (AJOL)

    Measures to be taken by management at equilibrating employees' psychological contract breach, reducing labour turnover and increasing commitment are suggested. Keywords: Mergers, acquisition, Commitment, psychological contract breach, and psychological contract violation, human resource management.

  2. The use of Osseointegration and Orbital Implants in the Management of Orbital Exenteration or Severe Contracted Sockets

    Directory of Open Access Journals (Sweden)

    Emine Esra Karaca

    2014-03-01

    Full Text Available Objectives: To evaluate the results of bony integrated implants used in the management of exenterated or contracted sockets. Materials and Methods: Ten eyes of 10 cases underwent bony integrated implants for the management of exenterated (7 eyes or contracted (3 eyes sockets. The procedure was performed in two steps in a two-month period. The first step included placement of screws by preparing the osteotomy site, whereas the second step included implantation of magnetic implants over these screws that will adhere to the orbital implant. The patients were retrospectively evaluated for age, gender, etiology, surgical timing, history of radiotherapy, and time of application of epithesis. The presence of infection at the surgical site, implant loss, functional or cosmetic problems at the perisurgical area, the usage of epithesis during the social life were evaluated. Results: There were 7 female and 3 male patients. The mean age was 34 (5-75 years. The indications for enucleation or exenteration were: retinoblastoma (4 cases, malignant melanoma (2 cases, basal cell carcinoma (1 case, squamous cell carcinoma (1 case, rhabdomyosarcoma (1 case and sinoorbital mucormycosis (1 case. The epitheses were applied 3 to 156 months (mean 51 months following the intervention. All of the implantations were performed successfully. During follow-up, one case had lost the implant and one case had local infection that responded to antibiotic treatment. Three cases were reoperated and the implants were replaced after a 2-year follow-up time due to the deterioration of the magnetic effect of the implants. Conclusion: Bony integrated orbital implants have an important role in solution of esthetic problems encountered in the exenterated orbit and severe contracted socket. (Turk J Ophthalmol 2014; 44: 127-31

  3. Managing wind turbine reliability and maintenance via performance-based contract

    DEFF Research Database (Denmark)

    Jin, Tongdan; Ding, Yi; Guo, Huairui

    2012-01-01

    Performance-based contracting (PBC) is reshaping the acquisition, operation, and maintenance of capital equipment. Under the PBC scheme, we propose a holistic approach for lowering the cost of wind turbine ownership while meeting the availability requirement. Our effects are focused on integrated...... between system cost, reliability and spare parts stocking. This analytical insight into the system performance allows the turbine manufacturer to optimize design, production, and after-sales services. The study aims to create a theoretical basis to facilitate the transition of the maintenance paradigm...

  4. Test Governance Framework for Contracted IS Development: Software Management Processes in Social Context

    OpenAIRE

    Doležel, Michal

    2017-01-01

    [Context] Outsourced information systems development (ISD) represents an important and widely used software delivery strategy for mid-size and large non-IT companies. In such companies, testing activities are conducted by a contracted party, and are hidden from continuous checks on the part of the client, who is typically only provided with insight during the system hand-over. Such an approach is risky; the testing activities might be executed in a loose and sloppy manner by the contractor. C...

  5. The Role of a Human Factor and Psychological Contract in Managing the Knowledge in Conditions of Globalization

    Directory of Open Access Journals (Sweden)

    Joanna Rębisz

    2008-07-01

    Full Text Available The modern business world is characterized by dynamic, changing markets and continuous technological advance. This article focuses on an issue related to a definition of the meaning of a man and his location in an organization that works in conditions of globalization. Certainly, the meaning of human as the source of knowledge in the development of organization is not a new subject. Knowledge is intrinsically linked to people and enables them to act. Modern organizations base their theory on the knowledge they can exploit to improve the competence of the employee, his loyalty and commitment to the company which aims at the competitive predominance. The identification of knowledge is necessary for the effective implementation of knowledge management system. Above all, presented theoretical analysis pinpoints mainly on discussing a mans role and psychological contract in managing the knowledge.

  6. Managing distrust-induced risk with deposit in supply chain contract decisions.

    Science.gov (United States)

    Han, Guanghua; Dong, Ming; Sun, Qi

    2014-01-01

    This paper studies the trust issue in a two-echelon supply chain information sharing process. In a supply chain, the retailer reports the forecasted demand to the supplier. Traditionally, the supplier's trust in the retailer's reported information is based on the retailer's reputation. However, this paper considers that trust is random and is also affected by the reputation and the demand gap. The supplier and retailer have been shown to have different evaluations regarding the degree of trust. Furthermore, distrust is inherently linked to perceived risk. To mitigate perceived risk, a two-stage decision process with an unpayback deposit contract is proposed. At the first stage, the supplier and the retailer negotiate the deposit contract. At the second stage, a Stackelberg game is used to determine the retailer's reported demand and the supplier's production quantity. We show that the deposits from the retailer's and supplier's perspectives are different. When the retailer's reported demand is equal to the supplier's forecasted demand, the retailer's evaluation of the deposit is more than that of supplier's. When the retailer's reported demand is equal to the retailer's forecasted demand, the deposit from the retailer's perspective is at the lowest level.

  7. Managing Distrust-Induced Risk with Deposit in Supply Chain Contract Decisions

    Science.gov (United States)

    Han, Guanghua; Dong, Ming; Sun, Qi

    2014-01-01

    This paper studies the trust issue in a two-echelon supply chain information sharing process. In a supply chain, the retailer reports the forecasted demand to the supplier. Traditionally, the supplier's trust in the retailer's reported information is based on the retailer's reputation. However, this paper considers that trust is random and is also affected by the reputation and the demand gap. The supplier and retailer have been shown to have different evaluations regarding the degree of trust. Furthermore, distrust is inherently linked to perceived risk. To mitigate perceived risk, a two-stage decision process with an unpayback deposit contract is proposed. At the first stage, the supplier and the retailer negotiate the deposit contract. At the second stage, a Stackelberg game is used to determine the retailer's reported demand and the supplier's production quantity. We show that the deposits from the retailer's and supplier's perspectives are different. When the retailer's reported demand is equal to the supplier's forecasted demand, the retailer's evaluation of the deposit is more than that of supplier's. When the retailer's reported demand is equal to the retailer's forecasted demand, the deposit from the retailer's perspective is at the lowest level. PMID:25054190

  8. Managing Distrust-Induced Risk with Deposit in Supply Chain Contract Decisions

    Directory of Open Access Journals (Sweden)

    Guanghua Han

    2014-01-01

    Full Text Available This paper studies the trust issue in a two-echelon supply chain information sharing process. In a supply chain, the retailer reports the forecasted demand to the supplier. Traditionally, the supplier’s trust in the retailer’s reported information is based on the retailer’s reputation. However, this paper considers that trust is random and is also affected by the reputation and the demand gap. The supplier and retailer have been shown to have different evaluations regarding the degree of trust. Furthermore, distrust is inherently linked to perceived risk. To mitigate perceived risk, a two-stage decision process with an unpayback deposit contract is proposed. At the first stage, the supplier and the retailer negotiate the deposit contract. At the second stage, a Stackelberg game is used to determine the retailer’s reported demand and the supplier’s production quantity. We show that the deposits from the retailer’s and supplier’s perspectives are different. When the retailer’s reported demand is equal to the supplier’s forecasted demand, the retailer’s evaluation of the deposit is more than that of supplier’s. When the retailer’s reported demand is equal to the retailer’s forecasted demand, the deposit from the retailer’s perspective is at the lowest level.

  9. Defining Medically Necessary Services To Protect Children. Protecting Consumer Rights in Public Systems: Managed Mental Health Care Policy. A Series of Issue Papers on Contracting for Managed Behavioral Health Care, #5.

    Science.gov (United States)

    Bazelon Center for Mental Health Law, Washington, DC.

    This issue paper is designed to help families, advocates and policymakers ensure that "medically necessary" standards in public-sector contracts for managed mental health care protect children's rights, particularly the rights of children who have serious emotional disturbance. Fundamental principles for developing sound contracts for…

  10. Premature Contractions

    Science.gov (United States)

    ... Peripheral Artery Disease Venous Thromboembolism Aortic Aneurysm More Premature Contractions - PACs and PVCs Updated:Dec 15,2016 ... You felt this more-forceful beat. Types of premature contractions Premature atrial contractions (PACs) start in the ...

  11. Contract Management Process and Mentorship Analysis of United States Special Operations Command’s (USSOCOM) Special Operations Acquisition and Logistics Directorate of Procurement (SOAL-K)

    Science.gov (United States)

    2009-12-01

    thesis are those of the author and do not reflect the official policy or position of the Department of Defense or the U.S. Government. 12a. DISTRIBUTION...OF FIGURES Figure 1. SEI- CMMI (From: SEI, 2009, p. 4).................................................................16 Figure 2. Projected AT&L...Affairs CINC Commander in Chief CMMAT Contract Management Maturity Assessment Tool CMMI Capability Maturity Model Integration CMMM Contract

  12. Perceived Barriers to Utilizing Maternal and Neonatal Health Services in Contracted-Out Versus Government-Managed Health Facilities in the Rural Districts of Pakistan

    Directory of Open Access Journals (Sweden)

    Atif Riaz

    2015-05-01

    Full Text Available Background A number of developing countries have contracted out public health facilities to the Non-Government Organizations (NGOs in order to improve service utilization. However, there is a paucity of in-depth qualitative information on barriers to access services as a result of contracting from service users’ perspective. The objective of this study was to explore perceived barriers to utilizing Maternal and Neonatal Health (MNH services, in health facilities contracted out by government to NGO for service provision versus in those which are managed by government (non-contracted. Methods A community-based qualitative exploratory study was conducted between April to September 2012 at two contracted-out and four matched non-contracted primary healthcare facilities in Thatta and Chitral, rural districts of Pakistan. Using semi-structured guide, the data were collected through thirty-six Focus Group Discussions (FGDs conducted with mothers and their spouses in the catchment areas of selected facilities. Thematic analysis was performed using NVivo version 10.0 in which themes and sub-themes emerged. Results Key barriers reported in contracted sites included physical distance, user charges and familial influences. Whereas, poor functionality of health centres was the main barrier for non-contracted sites with other issues being comparatively less salient. Decision-making patterns for participants of both catchments were largely similar. Spouses and mother-in-laws particularly influenced the decision to utilize health facilities. Conclusion Contracting out of health facility reduces supply side barriers to MNH services for the community served but distance, user charges and low awareness remain significant barriers. Contracting needs to be accompanied by measures for transportation in remote settings, oversight on user fee charges by contractor, and strong communitybased behavior change strategies.

  13. Financing Computer Systems and Other Equipment at the Defense Contract Management Command

    National Research Council Canada - National Science Library

    1997-01-01

    The audit objective was to determine whether DLA had implemented effective management control procedures and complied with laws and regulations in accounting for and reporting on certain accounting transactions...

  14. Pan-European Management of Electricity Portfolios: Risks and Opportunities of Contract Bundling

    OpenAIRE

    Gampert, Markus; Madlener, Reinhard

    2010-01-01

    Today’s European utilities not only focus on electricity supply, but also offer exchange-traded “structured products” or portfolio management for unbundling financial and physical risk positions. Many utilities are only able to provide these services inside of their home markets, but in the globalized economy, the need for a centrally organized pan-European portfolio management has arisen. In this paper, we analyze the problems to be overcome for establishing a European-wide bundling of elect...

  15. Privacy Management Service Contracts as a New Business Opportunity for Operators

    OpenAIRE

    Pau, Louis-François

    2006-01-01

    textabstractRecognizing the importance of privacy management as a business process and a business support process, this paper proposes the use of service level agreements (SLA’s) around privacy features, including qualitative and quantitative ones. Privacy metrics are defined by both parties with boundary values on each qualitative or qualitative feature. Their distribution is relying on stress distributions used in this field. The use of service level agreements also casts privacy management...

  16. A Guide to Delivering Good Asset Management in the Road Sector through Performance Based Contracting

    OpenAIRE

    Gericke, Ben; Henning, Theuns; Greewood, Ian

    2014-01-01

    The road sector represents a significant asset to any country both in terms of the physical cost to build it, and the social and economic benefits that it facilitates. Good asset management in the road sector is about obtaining the desired benefits at the least whole-of-life cost, and it is therefore natural to seek to implement a robust asset management approach on what is typically a nat...

  17. Aligning drivers, contract, and management of IT-outsourcing relationships: a type-dependent model

    DEFF Research Database (Denmark)

    Arenfeldt, Katrine; Corty Dam, Amalie; Harder Fenger, Kim

    2017-01-01

    In today’s competitive business environment, information technology outsourcing has become a wide-spread reality across all industries and sectors. Researchers have investigated this complex phenomenon from various angles, and established a sound knowledge base regarding the drivers, management...... that relates aspects of contractual governance and relationship management to three generic types of IT outsourcing, based on their underlying drivers: task-based, process-based, and partnership-based outsourcing. Our model identifies the specific contractual and managerial factors relevant for each type...

  18. DCASR (Defense Contract Administration Service Region), Boston Is the Customer’s Voice. Total Quality Management

    Science.gov (United States)

    1989-10-01

    been Hoshin Kanri , the Japanese term for Management by Planning, which loosely translates as "compass" and "sextant". When we initially began the...commitment empowered us to develop a plan which would clearly point the direction ( Hoshin ), as well as provide the structure for getting there ( Kanri

  19. Privacy Management Service Contracts as a New Business Opportunity for Operators

    NARCIS (Netherlands)

    L-F. Pau (Louis-François)

    2006-01-01

    textabstractRecognizing the importance of privacy management as a business process and a business support process, this paper proposes the use of service level agreements (SLA’s) around privacy features, including qualitative and quantitative ones. Privacy metrics are defined by both parties with

  20. Integral Risk Management for DBFM Tenders and Contracts in the Netherlands

    NARCIS (Netherlands)

    Wong, J.; Berkelaar, R.; Pekelharing, H.

    2015-01-01

    This paper presents an overview of an integral risk management approach with emphasis on the relationships with the costing and scheduling processes. Forms of uncertainty related to project planning are classified and implemented in the probabilistic costing and scheduling processes. Furthermore,

  1. 48 CFR 2446.710 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE Warranties 2446.710 Contract clauses. (c)(1) The contracting officer may include a clause substantially the same as FAR 52.246-19, Warranty of Systems and Equipment under...

  2. Using SCOR as a Supply Chain Management Framework for Government Agency Contract Requirements

    Science.gov (United States)

    Paxton, Joe

    2010-01-01

    Enterprise Supply Chain Management consists of: Specifying suppliers to support inter-program and inter-agency efforts. Optimizing inventory levels and locations throughout the supply chain. Executing corrective actions to improve quality and lead time issues throughout the supply chain. Processing reported data to calculate and make visible supply chain performance (provide information for decisions and actions). Ensuring the right hardware and information is provided at the right time and in the right place. Monitoring the industrial base while developing, producing, operating and retiring a system. Seeing performance deep in the supply chain that could indicate issues affecting system availability and readiness.

  3. An In-Port Feeding System for Shipboard Personnel. Volume 2. A Cost Benefit Analysis of the Use of Convenience Foods in a Military Foodservice Operation.

    Science.gov (United States)

    1981-10-01

    and two desserts . In designing the menu, consideration was given to the basic menu planning principles of color, shape, flavor, acceptability...cost using available raw ingredient price lists. The convenience foodservice system combined both convenience and selected conventional food costs...prepared by using ingredients in convenience form. For example, cole slaw could be prepared from precut cabbage, onions end other fresh vegetables

  4. A Comparison of Student Performance in a National Restaurant Association Foodservice Sanitation Exam by Students Taking versus Those Not Taking a Review Seminar.

    Science.gov (United States)

    Fleury, Ernest

    A practicum was conducted to examine and improve the performance of students enrolled in a college of culinary arts on the National Restaurant Association Foodservice (NRAF) sanitation certification examination. Because the pass rate among students retaking the examination was lower than that among students taking the examination for the first…

  5. Career Progression Systems in the Internal Labor Market of the Foodservice Industry and the Role of the National Restaurant Association. Final Report.

    Science.gov (United States)

    Smith, Leonard; Pezzullo, Caroline

    The lack of visible career paths was universally recognized as a major factor leading to the extraordinarily high rate of turnover and absenteeism in the foodservice industry. The report evaluates the potential of a National Trade Association as a vehicle for improvements in this area and focuses on National Restaurant Association (NRA) efforts in…

  6. Optimal Coordinated Management of a Plug-In Electric Vehicle Charging Station under a Flexible Penalty Contract for Voltage Security

    Directory of Open Access Journals (Sweden)

    Jip Kim

    2016-07-01

    Full Text Available The increasing penetration of plug-in electric vehicles (PEVs may cause a low-voltage problem in the distribution network. In particular, the introduction of charging stations where multiple PEVs are simultaneously charged at the same bus can aggravate the low-voltage problem. Unlike a distribution network operator (DNO who has the overall responsibility for stable and reliable network operation, a charging station operator (CSO may schedule PEV charging without consideration for the resulting severe voltage drop. Therefore, there is a need for the DNO to impose a coordination measure to induce the CSO to adjust its charging schedule to help mitigate the voltage problem. Although the current time-of-use (TOU tariff is an indirect coordination measure that can motivate the CSO to shift its charging demand to off-peak time by imposing a high rate at the peak time, it is limited by its rigidity in that the network voltage condition cannot be flexibly reflected in the tariff. Therefore, a flexible penalty contract (FPC for voltage security to be used as a direct coordination measure is proposed. In addition, the optimal coordinated management is formulated. Using the Pacific Gas and Electric Company (PG&E 69-bus test distribution network, the effectiveness of the coordination was verified by comparison with the current TOU tariff.

  7. 75 FR 2463 - Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers...

    Science.gov (United States)

    2010-01-15

    ... Civil Works projects only. This proposal is in response to a recurring statutory provision that requires.... SUPPLEMENTARY INFORMATION: A. Background The new funding clause for civil works projects includes alternate... contracts.'' The use of continuing contracts permitted large civil work projects, spanning more than one...

  8. Managing Contract Training Programs: Progress and Proposals. Institute for Studies in Higher Education Policy Paper No. 2.

    Science.gov (United States)

    Deegan, William L.

    An overview is provided of community college involvement in providing job training for industry on a contract basis. Part 1 provides background on the changing role of community colleges and the introduction of contract training as a means of addressing the growing need of organizations to train and retrain staff. Part 2 offers a national…

  9. Report: Improved Contract Administration Needed for the Customer Technology Solutions Contract

    Science.gov (United States)

    Report #13-P-0398, September 16, 2013. Based on our review of the WCF contract EPW08034, which ended September 2012, the EPA needs to improve its contract administration to assist in managing other similar type contracts.

  10. Polymorphic Contracts

    Science.gov (United States)

    Belo, João Filipe; Greenberg, Michael; Igarashi, Atsushi; Pierce, Benjamin C.

    Manifest contracts track precise properties by refining types with predicates - e.g., {x : Int |x > 0 } denotes the positive integers. Contracts and polymorphism make a natural combination: programmers can give strong contracts to abstract types, precisely stating pre- and post-conditions while hiding implementation details - for example, an abstract type of stacks might specify that the pop operation has input type {x :α Stack |not ( empty x )} . We formalize this combination by defining FH, a polymorphic calculus with manifest contracts, and establishing fundamental properties including type soundness and relational parametricity. Our development relies on a significant technical improvement over earlier presentations of contracts: instead of introducing a denotational model to break a problematic circularity between typing, subtyping, and evaluation, we develop the metatheory of contracts in a completely syntactic fashion, omitting subtyping from the core system and recovering it post facto as a derived property.

  11. Electrical contracting

    CERN Document Server

    Neidle, Michael

    2013-01-01

    Electrical Contracting, Second Edition is a nine-chapter text guide for the greater efficiency in planning and completing installations for the design, installation and control of electrical contracts. This book starts with a general overview of the efficient cabling and techniques that must be employed for safe wiring design, as well as the cost estimation of the complete electrical contract. The subsequent chapters are devoted to other electrical contracting requirements, including electronic motor control, lighting, and electricity tariffs. A chapter focuses on the IEE Wiring Regulations an

  12. Assessment of food offerings and marketing strategies in the food-service venues at California Children's Hospitals.

    Science.gov (United States)

    Lesser, Lenard I; Hunnes, Dana E; Reyes, Phedellee; Arab, Lenore; Ryan, Gery W; Brook, Robert H; Cohen, Deborah A

    2012-01-01

    Marketing strategies and food offerings in hospital cafeterias can impact dietary choices. Using a survey adapted to assess food environments, the purpose of this study was to assess the food environment available to patients, staff, and visitors at the food-service venues in all 14 California children's hospitals. We modified a widely-used tool to create the Nutritional Environment Measures Survey for Cafeterias (NEMS-C) by partnering with a hospital wellness committee. The NEMS-C summarizes the number of healthy items offered, whether calorie labeling is present, if there is signage promoting healthy or unhealthy foods, pricing structure, and the presence of unhealthy combination meals. The range of possible scores is zero (unhealthy) to 37 (healthy). We directly observed the food-service venues at all 14 tertiary care children's hospitals in California and scored them. Inter-rater reliability showed 89% agreement on the assessed items. For the 14 hospitals, the mean score was 19.1 (SD = 4.2; range, 13-30). Analysis revealed that nearly all hospitals offered diet drinks, low-fat milk, and fruit. Fewer than one-third had nutrition information at the point of purchase and 30% had signs promoting healthy eating. Most venues displayed high calorie impulse items such as cookies and ice cream at the registers. Seven percent (7%) of the 384 entrees served were classified as healthy according to NEMS criteria. Most children's hospitals' food venues received a mid-range score, demonstrating there is considerable room for improvement. Many inexpensive options are underused, such as providing nutritional information, incorporating signage that promotes healthy choices, and not presenting unhealthy impulse items at the register. Copyright © 2012 Academic Pediatric Association. Published by Elsevier Inc. All rights reserved.

  13. The Healthcare Administrator’s Desk Reference: A Managed Care and Health Care Contracting Dictionary for the Military Health System

    Science.gov (United States)

    1998-07-01

    Contracting Officer ACOG American College of Obstetrics & Gynecology ACOR Administrative Contracting Officer Representative ACOS American College of...Defense Medical Standardization Board Desk Reference 43 DO 1. Delivery Order 2. Doctor of Osteopathy DOB Date of Birth DOC 1. Department of Commerce 2...76 OB/GYN Obstetrics & Gynecology OBD Occupied Bed Days OBRA Omnibus Budget Reconciliation Act OCHAMPUS Office of Civilian Health & Medical Program

  14. Dynamics of risk management in the regulated contracting environment of the Brazilian electrical sector; Dinamica da gestao de riscos no ambiente de contratacao regulada do setor eletrico brasileiro

    Energy Technology Data Exchange (ETDEWEB)

    Souza, Fabio Cavaliere de

    2008-11-15

    This thesis analyses the dynamics of risk management in the regulated contracting environment of the Brazilian electrical sector. As in the new model the distribution utilities are obliged to ensure energy contracting to supply their whole markets, these companies became exposed to volume risks related to the demand uncertainties. So the new model following similar directives from the first phase developed management tools to mitigate the new risks mentioned above. As in a well structured market it is expected that the risks should be evenly shared or that risk management tools should be provided for all, this work intended to analyze the dynamics of the designed mechanisms and their impacts over the regulated market. In this work the risks of the electricity markets are studied and the management tools devised for the Brazilian market are identified. Finally for understanding the dynamics a thorough analysis of the auctions, of the mechanism for compensation of surplus and deficits and tariffs are carried on. The results show that the management tools were regularly employed by distribution companies, but the risks were merely transferred to the captive customers leading to distortions and asymmetries that conflict with the basis that guided the second phase of the reform. The work proposes remedial actions to mitigate the observed impacts and to provide risk management tools to the captive customer. (author)

  15. Contract out

    Energy Technology Data Exchange (ETDEWEB)

    Walker, S. (Independent Editorial and Technical Services, Oxford (United Kingdom))

    1999-05-01

    Mining companies opt to offer all or part of their operations out to contract mainly to reduce risk. Contract mining has been most popular in the Southern Hemisphere over the last 15 years, with some exceptions - contractors were often employed in the UK's opencast coal sector and some US coal operators have made extensive use of contract mining. The article discusses the pros and cons of outsourcing, giving examples of contracted out work in Australia (by Thiess Contractors) the USA (Morrison Knudsen), and the UK (Kie Mining). The author comments that successful contracting can only be achieved where both parties know where they stand and have a good working relationship. 2 photos.

  16. 48 CFR 970.1504 - Contract pricing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract pricing. 970.1504 Section 970.1504 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504 Contract pricing. ...

  17. 48 CFR 546.710 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... Section 546.710 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION CONTRACT MANAGEMENT QUALITY ASSURANCE Warranties 546.710 Contract clause. The Contracting officer shall insert the clause at 552.246-77, Additional Contract Warranty Provisions for Supplies of a Noncomplex Nature, when using...

  18. 48 CFR 846.710 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... Section 846.710 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT QUALITY ASSURANCE Warranties 846.710 Contract clauses. The contracting officer shall insert the clause at FAR 52.246-21, Warranty of Construction, in solicitations and contracts for construction that are...

  19. 48 CFR 747.507 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 747.507 Section 747.507 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 747.507 Contract clauses. Contracting...

  20. 48 CFR 1443.205 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1443.205 Section 1443.205 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 1443.205 Contract clauses. BPCs may establish procedures, when...

  1. 48 CFR 745.106 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 745.106 Section 745.106 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 745.106 Contract clauses. (a) The contracting officer shall insert the...

  2. 24 CFR 242.52 - Construction contracts.

    Science.gov (United States)

    2010-04-01

    ...; a construction management contract with a guaranteed maximum price, the final costs of which are... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A...

  3. Innovation Processes in Large-Scale Public Foodservice-Case Findings from the Implementation of Organic Foods in a Danish County

    DEFF Research Database (Denmark)

    Mikkelsen, Bent Egberg; Nielsen, Thorkild; Kristensen, Niels Heine

    2005-01-01

    . Since one of the most important areas both socially and environmentally is production and consumption of food, some individual European governments have worked out action plans setting out concrete goals for conversion of arable land from conventional to organic. One of the emerging areas for attention...... foods into large-scale foodservice such as that taking place in hospitals and larger homes for the elderly, has proven to be quite difficult. The very complex planning, procurement and processing procedures used in such facilities are among reasons for this. Against this background an evaluation...... was carried out of the change process related implementation of organic foods in large-scale foodservice facilities in Greater Copenhagen county in order to study the effects of such a change. Based on the findings, a set of guidelines has been developed for the successful implementation of organic foods...

  4. Innovation Processes in Large-Scale Public Foodservice-Case Findings from the Implementation of Organic Foods in a Danish County

    DEFF Research Database (Denmark)

    Mikkelsen, Bent Egberg; Nielsen, Thorkild; Kristensen, Niels Heine

    2005-01-01

    is the idea that the large-scale foodservice such as hospital food service should adopt a buy organic policy due to their large buying volume. But whereas implementation of organic foods has developed quite unproblematically in smaller institutions such as kindergartens and nurseries, introduction of organic....... Since one of the most important areas both socially and environmentally is production and consumption of food, some individual European governments have worked out action plans setting out concrete goals for conversion of arable land from conventional to organic. One of the emerging areas for attention...... foods into large-scale foodservice such as that taking place in hospitals and larger homes for the elderly, has proven to be quite difficult. The very complex planning, procurement and processing procedures used in such facilities are among reasons for this. Against this background an evaluation...

  5. A Classification and Analysis of National Contract Management Journal Articles from 1990 to 1999 and Journal of Supply Chain Management Articles from 1987 to 2000

    Science.gov (United States)

    2001-12-01

    with the rights of the contract awardees in bid protest litigation to defend the contract award. Finally, the article discusses the business and...Inductive, [V] The Apparel Industry Response to “ Sweatshop ” Concerns: A Review and Analysis of Codes of Conduct, M.A. Emmelhainz, and R.J

  6. Capsule contraction syndrome

    Directory of Open Access Journals (Sweden)

    Mesut COŞKUN

    2009-06-01

    Full Text Available Capsule contraction syndrome occurs after fibrous metaplasia of lens proteins that leads to capsular bag contraction. Excessive front capsular wrinkling is seen in capsule contraction syndrome and there is an imbalance between powers supplying capsular integrity. This situation leads to zonular weakness. Capsule contraction syndrome is associated with pseudoexfoliation, older age, uveitis, pars planitis and myotonic muscular dystrophy. In order to decrease the risk of capsule contraction syndrome, front capsulerhexis area should be open as 5.5-6 mm diameter and a curysoft intraocular lens should be used. In order to prevent lens epithelial proliferation and metaplasia, lens epithelial cells at inferior surface of front capsule should be aspirated carefully. If postoperative capsular contraction detected, front capsulotomy should be performed by Nd-YAG laser at postoperative 2 to 3 weeks. In patients that Nd-YAG laser is unsuccessful, capsular tension should be decreased by surgical microincisions. In present study, we evaluated etiology, prevention and management of capsule contraction syndrome in the light of actual literature knowledge.

  7. School Nutrition Employees' Perceptions of Farm to School (FTS) Activities Differ Based on Management Type and FTS Participation Length

    Science.gov (United States)

    Kang, Sangwook; Arendt, Susan W.; Stokes, Nathan M.

    2016-01-01

    Purpose: The purpose of this study was to explore school nutrition employees' perceptions of FTS activities and whether the numbers of activities differ based on management type of school foodservice operation and length of FTS participation. Methods: The state with the most FTS programs from each of the eight national FTS regions was selected. A…

  8. Mobilizing to Re-value and Re-skill Foodservice Labor in U.S. School Lunchrooms: A Pathway to Community-level Food Sovereignty?

    Directory of Open Access Journals (Sweden)

    Jennifer E. Gaddis

    2014-02-01

    Full Text Available School foodservice is a form of reproductive labor, which is a term meant to encompass various kinds of work—mental, manual, and emotional—aimed at providing the historically and socially, as well as biologically, defined care necessary to maintain existing life and to reproduce the next generation. The increasing reliance on part-time work, convenience foods, and privatization that began in the early 1970s prevents many lunchroom workers’ from performing critical acts of reproductive labor. The unintended consequences of this transformation are now becoming clear in terms of the quality of food served in the nation’s lunchrooms, the nature of school foodservice labor, and the ecological consequences of the industrial food system. For a radical food politics, reversing the devaluing and deskilling of school foodservice provides a tremendous opportunity to engage both workers and students in pursuit of a just and sustainable food system. Much is at stake – over thirty million children participate in the National School Lunch Program each day. Thus the critical question becomes one of how such a radical revaluing and reskilling can be initiated. One possible avenue is through organized labor. In this article, I analyze early efforts to drive such a transformation, drawn from twelve months of participatory research with UNITE HERE! during their “Real Food, Real Jobs” campaigns in three U.S. cities.

  9. Service quality in contracted facilities.

    Science.gov (United States)

    Rabbani, Fauziah; Pradhan, Nousheen Akber; Zaidi, Shehla; Azam, Syed Iqbal; Yousuf, Farheen

    2015-01-01

    The purpose of this paper is to explore the readiness of contracted and non-contracted first-level healthcare facilities in Pakistan to deliver quality maternal and neonatal health (MNH) care. A balanced scorecard (BSC) was used as the assessment framework. Using a cross-sectional study design, two rural health centers (RHCs) contracted out to Aga Khan Health Service, Pakistan were compared with four government managed RHCs. A BSC was designed to assess RHC readiness to deliver good quality MNH care. In total 20 indicators were developed, representing five BSC domains: health facility functionality, service provision, staff capacity, staff and patient satisfaction. Validated data collection tools were used to collect information. Pearson χ2, Fisher's Exact and the Mann-Whitney tests were applied as appropriate to detect significant service quality differences among the two facilities. Contracted facilities were generally found to be better than non-contracted facilities in all five BSC domains. Patients' inclination for facility-based delivery at contracted facilities was, however, significantly higher than non-contracted facilities (80 percent contracted vs 43 percent non-contracted, p=0.006). The study shows that contracting out initiatives have the potential to improve MNH care. This is the first study to compare MNH service delivery quality across contracted and non-contracted facilities using BSC as the assessment framework.

  10. Learning contracts

    Directory of Open Access Journals (Sweden)

    Nena Mijoč

    2006-12-01

    Full Text Available There are four different expressions to describe the method of learning, which increases the efficiency of adult learning. The article explains the translation of »learning contract« into Slovene as a method in adult learning area, which came in use in USA in 1970, also in organizations offering formal education. In the period of lifelong learning, when everyone is supposed to be able to learn efficiently from different sources it is even more important to have the skills to plan our learning. Learning contract develops these competencies and has already become established in organizations, which support learning processes. Learning contract is slowly gaining ground also to the area of formal education. Learning contract is an agreement in writing between two people, where one of them offers advice, the other undertakes the learning process. How do we prepare the agreement, who is responsible for its preparation and execution? Learning contract in writing explains objectives, techniques, strategies and how the learning process will be assessed. At the same time, learning is also limited in time. It is a strong motivational took, since it comprises needs of an individual and is adapted to the interests and learning style of a particular individual. This is especially suitable method for acquiring competencies, for field work and experiential learning at work. Learning contract is very suitable and efficient also for independent academical studies, especially when combined with the method of discussion.

  11. Proposal for the Award of a Contract, without competitive Tendering, for the Provision of the ORACLE Database Management System Software together with Tools for Application Development and System Exploitation

    CERN Document Server

    1995-01-01

    Proposal for the Award of a Contract, without competitive Tendering, for the Provision of the ORACLE Database Management System Software together with Tools for Application Development and System Exploitation

  12. 48 CFR 923.903 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 923.903... Environmental Management Systems § 923.903 Contract clause. The FAR Environmental Management Systems clause at 52.223-XX should be used in contracts where the contractor operates a DOE site or portion thereof...

  13. Contract Renewal Information - all Contracts

    Data.gov (United States)

    Department of Housing and Urban Development — Multifamily Portfolio datasets (section 8 contracts) - The information has been compiled from multiple data sources within FHA or its contractors. HUD oversees more...

  14. Utility Energy Services Contracts: Enabling Documents

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Karen; Vasquez, Deb

    2017-01-01

    The Federal Energy Management Program's 'Utility Energy Service Contracts: Enabling Documents' provide legislative information and materials that clarify the authority for federal agencies to enter into utility energy service contracts, or UESCs.

  15. Does contracting with owner operators lead to worse safety outcomes for US motor carriers? Evidence from the Motor Carrier Management Information System.

    Science.gov (United States)

    Monaco, Kristen; Redmon, Brydey

    2012-03-01

    Using data from the Motor Carrier Management Information System, we model crashes as a function of firm characteristics, with a focus on the employment relationship. We find that very small firms (one driver, one truck) and firms that contract with owner operators have fewer crashes than employee-only companies, once other firm characteristics and exposure are controlled. Additionally, though very small firms are more likely to have severe crashes, we find no relationship between the share of owner operators and crash severity. Copyright © 2011 Elsevier Ltd. All rights reserved.

  16. PROPOSAL OF THE SOCIAL CONTRACT IN MANAGEMENT AS INSTRUMENT OF ANALYSIS FOR THE EMPLOYMENT RELATION. THE EXPERIENCE OF AUTOMOTIVE INDUSTRY IN ROMANIA

    Directory of Open Access Journals (Sweden)

    Muresanu Doina

    2012-07-01

    Full Text Available The communication presents the partial results of a research proposing the social contract as a new instrument of analysis for the employment relation in a social context in change, such as the case of Rumania. Until then, the research which aimed at the employment relation which is formed between the employer and the employees widely appealed to the concept of psychological contract (Rousseau, 1989; 1995. The psychological contract, defined as the perception of the mutual obligations assumed by the employee and by the employer, benefited from a fashion effect in the 1990s, when the economic difficulties questioned the model of classic employment relation based on loyalty. However, most of the empirical works on the psychological contract are static studies, for the greater part elaborated by questionnaire, which do not allow to define the impact of the social context change on the evolution of the employment relation. Although certain studies are interested in a context of change (Dick, 2010, most of the past works describe the contents and the evaluation of the psychological contract in an unchanging social environment. Yet, we saw it in the case of the ex-communist countries or those of the Northern Africa, the change in the environment of the employment relation is more present than ever. Our communication proposes a research frame which would be more suited to the understanding of the employment relation in a society in change. To do it, we rely on the social contract in management, which we define as the ensemble of the norms and of the tacit laws existing in a society or a group given with regard to the relation of employment. The approach by the social contract presents the advantage of including multiple elements bound to a societal context, such as the laws, the national culture, the faiths shared by the business environment, etc. (Rousseau, 1995. It offers a new frame of analysis for the employment relation by suggesting that it is

  17. 48 CFR 42.203 - Contract administration services directory.

    Science.gov (United States)

    2010-10-01

    ... services directory. 42.203 Section 42.203 Federal Acquisition Regulations System FEDERAL ACQUISITION....203 Contract administration services directory. The Defense Contract Management Agency (DCMA) maintains the Federal Directory of Contract Administration Services Components. The directory lists the...

  18. Agile Contracts

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Pries-Heje, Lene

    2014-01-01

    with “endless” re-negotiation of the requirements; you need a more flexible way to develop IS. A new way of coping with many changes is to use an agile development approach and a fixed budget and resources contract. This paper presents an example case. We analyse the case and design a guideline for how...

  19. 24 CFR 880.609 - Adjustment of contract rents.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Adjustment of contract rents. 880... Management § 880.609 Adjustment of contract rents. (a) Automatic annual adjustment of Contract Rents. Upon request from the owner to the contract administrator, contract rents will be adjusted on the anniversary...

  20. 48 CFR 1442.202 - Assignment of contract administration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Assignment of contract administration. 1442.202 Section 1442.202 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Services 1442.202 Assignment of contract administration. ...

  1. 48 CFR 1342.202 - Assignment of contract administration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Assignment of contract administration. 1342.202 Section 1342.202 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Contract Administration Services 1342.202 Assignment of contract administration. The designee authorized...

  2. Contracting and Performance in Agencies

    DEFF Research Database (Denmark)

    Bjørnholt, Bente; Houlberg Salomonsen, Heidi; Rennison, Betina Wolfgang

    , documentary and interview data. To measure the degree of performance as the degree of goal attainment, all agency contracts for 2008 as well as the subsequent ‘enterprise accounts’ defining the goal attainment have been collected. There were 62 agencies in 2008, 58 of which had a contract. Goal attainment......As part of New Public Management (NPM), contracting represents a supplement to the traditional hierarchical and rule-based managing of relations between actors in order to improve performance (Fortin and van Hassel 2000; Greve and Ejersbo 2002; Drewry et al. 2005; Verhoest 2005). To various degrees...... contracts combine some degree of managerial autonomy and influence on goal setting in return for a consistent and congruent system of control and monitoring. Internal contracts are often finalized within the ‘shadow of hierarchy’ between mutually dependent parties in a long-term, co-operation-based...

  3. Contract theory and EU Contract Law

    NARCIS (Netherlands)

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories

  4. Assessing Organization Culture Readiness for Knowledge Management Implementation: The Case of Aeronautical Systems Center Directorate of Contracting

    National Research Council Canada - National Science Library

    Trent, Martin

    2003-01-01

    .... Leveraging knowledge (intellectual capital) to increase efficiency and effectiveness within the organization has become a popular management technique that has been successful in many commercial firms...

  5. A foodservice approach to enhance energy intake of elderly subacute patients: a pilot study to assess impact on patient outcomes and cost.

    Science.gov (United States)

    Collins, Jorja; Porter, Judi; Truby, Helen; Huggins, Catherine E

    2017-05-01

    effective strategies are required to support the nutritional status of patients. to evaluate a foodservice nutrition intervention on a range of participant outcomes and estimate its cost. parallel controlled pilot study. subacute hospital ward. all consecutively admitted adult patients were eligible for recruitment under waiver of consent. the intervention was a modified hospital menu developed by substituting standard items with higher energy options. The control was the standard menu. All participants received usual multidisciplinary care. Outcomes were change in weight and hand grip strength (HGS) between admission and day 14 and; energy and protein intake and patient satisfaction with the foodservice at day 14. The additional cost of the intervention was also estimated. the median (interquartile range) age of participants (n = 122) was 83 (75-87) years and length of stay was 19 (11-32) days. One-third (38.5%) were malnourished at admission. There was no difference in mean (SD) HGS change (1.7 (5.1) versus 1.4 (5.8) kg, P = 0.798) or weight change (-0.55 (3.43) versus 0.26 (3.33) %, P = 0.338) between the intervention and control groups, respectively. The intervention group had significantly higher mean (SD) intake of energy (132 (38) versus 105 (34) kJ/kg/day, P = 0.003) and protein (1.4 (0.6) versus 1.1 (0.4) g protein/kg/day, P = 0.035). Both groups were satisfied with the foodservice. The additional cost was £4.15/participant/day. in this pilot, the intervention improved intake and may be a useful strategy to address malnutrition. Further consideration of clinical and cost implications is required in a fully powered study.

  6. 48 CFR 251.205 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... Fleet Management System (IFMS) Vehicles 251.205 Contract clause. Use the clause at 252.251-7001, Use of Interagency Fleet Management System (IFMS)Vehicles and Related Services, in solicitations and contracts which include the clause at FAR 52.251-2, Interagency Fleet Management System (IFMS) Vehicles and Related...

  7. The role of psychological contract on employee commitment and organisational citizenship behaviour: A study of Indonesian young entrepreneurs in management action

    Directory of Open Access Journals (Sweden)

    Ade I. Anggraeni

    2017-01-01

    Full Text Available Orientation: This study aims to analyse the entrepreneurship-driven reasons and characteristics of employee management of the young generation, by analysing the role of psychological contract on employee commitment and organisational citizenship behaviour in the light of the characteristics of the millennial generation as the owners of small and medium-sized enterprises.Research purpose: The main objective of this study was to empirically analyse the effect of the psychological contract and organisational support on the organisational commitment and organisational citizenship behaviour of the employees of small-scale enterprises run by young entrepreneurs, especially in the cohort generation.Motivation for the study: This study attempts to analyse the characteristics of the millennial generation as the owners of small and medium-sized enterprises (SMEs in running the business by examining their managerial characteristics in managing workplace relationship that aims to achieve the stakeholder expectations and improve both commitment and organisational citizenship behaviour of employees.Research design, approach and method: Data were collected in the SMEs owned by young entrepreneurs in a city in Indonesia involving 150 respondents. The research model was tested using Structural Equation Modelling with analysis of moment structure (AMOS.Main findings: The results showed that the employee citizenship behaviour is influenced by the organisational commitment. The commitment of employees was formed by the ability of business owners to understand the needs and expectations of employees regarding opportunities of self-development, pleasant working environment, the benefit as the workload and the work challenge.Practical and managerial implications: This study implies the need for academic institutions and policy makers to get involved in addressing the rising phenomenon of entrepreneurship among the young generation.Contribution and added-value: This

  8. 48 CFR 46.710 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... Section 46.710 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Warranties 46.710 Contract clauses. The clauses and alternates prescribed in this section may be used in solicitations and contracts in which inclusion of a warranty is appropriate (see 46...

  9. 48 CFR 1346.710 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1346.710 Section 1346.710 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACT MANAGEMENT QUALITY ASSURANCE Warranties 1346.710 Contract clauses. The warranty clauses and alternates under FAR Subpart 46.710...

  10. 48 CFR 1345.107 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1345.107 Section 1345.107 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 1345.107 Contract clauses. ...

  11. Managing the aftermaths of contracting in public transit organizations : employee perception of job security, organizational commitment and trust

    Science.gov (United States)

    2001-08-01

    This study assesses how to manage the effects or outcomes of organizational change on job security and employee commitment in transit systems using trust-building, empowerment, employee reassurance, and job redesign strategies. The major findings are...

  12. Report: Weak Management of a Climate Change Services Contract Creates Risk EPA Did Not Receive Services for Which It Paid

    Science.gov (United States)

    Report #14-P-0272, May 30, 2014. The EPA awards millions of federal dollars to contractors every year. It must have robust oversight and management controls in place to prevent waste and unnecessary spending.

  13. Retractable Contracts

    Directory of Open Access Journals (Sweden)

    Franco Barbanera

    2016-02-01

    Full Text Available In calculi for modelling communication protocols, internal and external choices play dual roles. Two external choices can be viewed naturally as dual too, as they represent an agreement between the communicating parties. If the interaction fails, the past agreements are good candidates as points where to roll back, in order to take a different agreement. We propose a variant of contracts with synchronous rollbacks to agreement points in case of deadlock. The new calculus is equipped with a compliance relation which is shown to be decidable.

  14. Principles of contracting; Grundlagen des Contracting. Waermecontracting - worauf es ankommt

    Energy Technology Data Exchange (ETDEWEB)

    Meixner, H. [HessenENERGIE, Gesellschaft fuer Rationelle Energienutzung mbH, Wiesbaden (Germany)

    2003-08-01

    Contracting has established itself as a permanent factor in the debate about energy policy and the energy industry. In a survey of senior managers in the German energy sector on the trends and services which will gain heavily in importance from 2002 to 2004, contracting occupied a prime position, immediately after 'New services in general' and 'Multi-utility' and far ahead of 'Electricity trading' or 'Telecommunications/Power lines'. Energy policy expectations of contracting are high and a lot of confidence is being placed in this service. Similarly long-term planning perspectives to those usual for energy generation facilities (e.g. power stations) must thus be facilitated for investment in saving energy. In its original version, contracting is only intended for the implementation of investments dedicated purely to saving energy, if possible, and accompanying measures by third parties. The amortisation of investments made by the contractor from the savings which can be made on energy costs is disputed. In parallel to such 'economy contracting' (also known as 'performance contracting'), energy supply contracting (also known as plant contracting or the supply of useful energy) has predominantly emerged, with a stronger orientation towards ordinary customer energy supply contracts. The user commissions an energy utility to provide the useful energy required. The utility frequently also assumes investment in the necessary technical plant, including planning, finance and operation - analogous to the supply of district heating. Various forms of finance contracting also exist which tend towards leasing and contracting models for the management of existing technical installations, which does not anticipate any (major) investment by the contractor. (orig.) [German] In den 90er Jahren hat Contracting 'Karriere' gemacht - allerdings eher der Begriff als die Sache, die er bezeichnet. Inzwischen sind aber

  15. Managing Relationships and Competence to Stay Market-Oriented: The Case of a Finnish Contract Research Organization

    DEFF Research Database (Denmark)

    Seppänen, Veikko; Skaates, Maria Anne

    2001-01-01

    Relationships influence organizations' competencies. A model of competence dynamics at the organization, dyad, and network levels is developed and applied in a contractual R&D case. It is argued that the model also depicts marketing concerns of knowledge-intensive professional services firms. Fin....... Finally developing processual models of relationship-related competence management is discussed....

  16. 48 CFR 970.5227-12 - Patent rights-management and operating contracts, for-profit contractor, advance class waiver.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Patent rights-management... international patent offices shall be filed within either ten (10) months of the corresponding initial patent... Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE...

  17. 48 CFR 970.5227-11 - Patent rights-management and operating contracts, for-profit contractor, non-technology transfer.

    Science.gov (United States)

    2010-10-01

    ....C. 2401(d)) shall also occur during the period of contract performance. (b) Allocation of principal... first actual reduction to practice, whichever occurs first in the performance of work under this... contract, the Contracting Officer or any authorized representative may examine any books (including...

  18. Applicability of NASA contract quality management and failure mode effect analysis procedures to the USGS Outer Continental Shelf oil and gas lease management program

    Science.gov (United States)

    Dyer, M. K.; Little, D. G.; Hoard, E. G.; Taylor, A. C.; Campbell, R.

    1972-01-01

    An approach that might be used for determining the applicability of NASA management techniques to benefit almost any type of down-to-earth enterprise is presented. A study was made to determine the following: (1) the practicality of adopting NASA contractual quality management techniques to the U.S. Geological Survey Outer Continental Shelf lease management function; (2) the applicability of failure mode effects analysis to the drilling, production, and delivery systems in use offshore; (3) the impact on industrial offshore operations and onshore management operations required to apply recommended NASA techniques; and (4) the probable changes required in laws or regulations in order to implement recommendations. Several management activities that have been applied to space programs are identified, and their institution for improved management of offshore and onshore oil and gas operations is recommended.

  19. Improvement of the course “Management of intellectual property” based on the mixed state contract in the field of scientific R&D

    Science.gov (United States)

    Yakovlev, D.; Ageev, A.; Yushkov, E.; Bogatyreova, M.

    2017-01-01

    Intellectual property (IP) is one of the forms of storing knowledge - intangible assets of knowledge economy. The translation of IP knowledge to the young generation is one of the challenges of nuclear knowledge management. At the NRNU MEPhI (National Research Nuclear University MEPhI), the subject is studied within the framework of the academic course “Management of intellectual property. The aim of the course is to train qualified specialists, ready to use modern methods of strategic management of IP in commercial firms. The article is devoted to the strengthening and transfer of IP rights for scientific output application in industry and commerce. The state remains the main source that finances all the significant developments in the field of science and technology. Therefore, the primary task is to effectively utilize the R&D output created at the expense of the Federal budget, both within the state order and the estimated budget financing. Currently, there exist contradictions in the area of strengthening and transfer of rights for R&D in the field of science. The newly borne concept dealing with the strengthening of IP rights for the scientific R&D output, centers on the theory of a mixed state contract and is conveniently integrated with the academic course mentioned. Knowledge itself takes the form of IP, as soon as it becomes formalized. The academic course when supplemented with various approaches to strengthening and transfer of IP rights for the scientific R&D output certainly gives a better understanding of the commercialization process of the intellectual capital and structures relevance to intellectual property. The research material is integrated with the educational process, and the academic course “Management of intellectual property” is designed both for economic and engineering specialties.

  20. 48 CFR 1851.205 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract clause. 1851.205 Section 1851.205 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management...

  1. Contracting as a Science

    Science.gov (United States)

    2012-04-30

    neoclassical theory to be classified as financial, physical, legal, human, organizational, informational, and relational. Each firm will have some...social science theories applicable to contracting research, identify a contracting paradigm (or paradigms) and potential contracting theories and...principles, examine the nature of contracting research and practice, and present thoughts and ideas toward a general theory of contracting which, hopefully

  2. 48 CFR 46.303 - Cost-reimbursement supply contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-reimbursement supply... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.303 Cost-reimbursement supply contracts. The contracting officer shall insert the clause at 52.246-3, Inspection of Supplies—Cost-Reimbursement, in...

  3. 48 CFR 3042.202 - Assignment of contract administration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Assignment of contract administration. 3042.202 Section 3042.202 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration...

  4. Increment contracts: southern experience and potential use in the Appalachians

    Science.gov (United States)

    Gary W. Zinn; Gary W. Miller

    1984-01-01

    Increment contracts are long-term timber management contracts in which landowners receive regular payments based on the average annual growth of wood their land is capable of producing. Increment contracts have been used on nearly 500,000 acres of private forests in the South. Southern experience suggests that several changes in the contract would improve its utility:...

  5. 41 CFR 50-201.1 - The Walsh-Healey Public Contracts Act.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true The Walsh-Healey Public Contracts Act. 50-201.1 Section 50-201.1 Public Contracts and Property Management Other Provisions Relating... Walsh-Healey Public Contracts Act. The Walsh-Healey Public Contracts Act, as amended (41 U.S.C. 35-45...

  6. CONTRACT FOLLOW UP TRAINING

    CERN Multimedia

    Technical Training; Tel. 74460

    2001-01-01

    SPL is organizing Training Sessions on the Contract Follow Up application. CFU is a Web based tool, developped and supported by the Administrative Information Services. It allows the creation of Divisional Requests and the follow up of their processing, from the Market Survey to the Invitation to Tender or Price Enquiry, approval by the Finance Committee, up to the actual signature of a Contract, acccording to the CERN Purchasing procedures. It includes a document management component. It also provides link with other AIS applications such as BHT and EDH. The course is primarily intended for DPOs, Contract Technical responsibles in the division and their assistants, but is beneficial to anybody involved in the follow up of such Purchasing Procedures. This course is free of charge, but application is necessary. The details of the course may be found at http://training.web.cern.ch/Training/ENSTEC/P2001/Bureautique/cfu4_f.htm General information of CFU may be found at http://ais.cern.ch/apps/cfu/ The dates of t...

  7. Managerial challenges in public service contracting

    DEFF Research Database (Denmark)

    Lindholst, Andrej Christian; Bogetoft, Peter

    2011-01-01

    In this article, we address a series of interrelated issues in the managerial challenge of public service contracting. This is done by prompting ten issues within four objectives and highlighting their relevance and potential interrelatedness in effective contract management. In contrast......-national sample of 15 cases of contracting-out in urban green-space management....... to prevalent piecemeal and theoretically one-dimensional approaches, the objectives and issues constitute a holistic framework that advances a comprehensive and pragmatic understanding of contracting processes. We hope that the framework merits further in-depth exploration that may generate new insights...

  8. Effect of the implementation of the Hazard Analysis Critical Control Point (HACCP prerequisite program in an institutional foodservice unit in Southern Brazil

    Directory of Open Access Journals (Sweden)

    Kelly Lameiro Rodrigues

    2012-03-01

    Full Text Available The aims of this study were to investigate the hygienic practices in the food production of an institutional foodservice unit in Southern Brazil and to evaluate the effect of implementing good food handling practices and standard operational procedures using microbiological hygiene indicators. An initial survey of the general operating conditions classified the unit as regular in terms of compliance with State safety guidelines for food service establishments. An action plan that incorporated the correction of noncompliance issues and the training of food handlers in good food handling practices and standard operational procedures were then implemented. The results of the microbiological analysis of utensils, preparation surfaces, food handlers' hands, water, and ambient air were recorded before and after the implementation of the action plan. The results showed that the implementation of this type of practice leads to the production of safer foods.

  9. A survey of formal languages for contracts

    DEFF Research Database (Denmark)

    Hvitved, Tom

    2010-01-01

    In this short paper we present the current status on formal languages and models for contracts. By a formal model is meant an unambiguous and rigorous representation of contracts, in order to enable their automatic validation, execution, and analysis — activates that are collectively referred to ...... to as contract lifecycle management (CLM). We present a set of formalism requirements, which represent features that any ideal contract model should support, based on which we present a comparative survey of existing contract formalisms.......In this short paper we present the current status on formal languages and models for contracts. By a formal model is meant an unambiguous and rigorous representation of contracts, in order to enable their automatic validation, execution, and analysis — activates that are collectively referred...

  10. An Analysis of Communication Between Program Managers and Contracting Officers and Its Effect on the Performance of the Defense Acquisition System

    Science.gov (United States)

    2015-09-01

    5 D. METHODOLOGY ...Department of Defense instruction ERP enterprise resource planning FAR Federal Acquisition Regulation FFP firm fixed price FPDS-NG...rejection. xix 2. Contract Type – Interviews revealed several cases where an appropriate contract type was bilaterally selected between the PM

  11. AGILE DRAFTING OF OUTSOURCING CONTRACTS

    DEFF Research Database (Denmark)

    Schlichter, Bjarne Rerup; Storgaard, Kristian

    2015-01-01

    The concept of ‘agility’ has become quite popular in the development of IT-artefacts and has created interest in the more general project management literature. The process of drafting complex contracts for large IT projects (service as well as software) is often done under time pressure and in s......The concept of ‘agility’ has become quite popular in the development of IT-artefacts and has created interest in the more general project management literature. The process of drafting complex contracts for large IT projects (service as well as software) is often done under time pressure...... and in several parallel tracks using different competencies. By the use of an illustrative case-study, this paper explores how scrum can be applied to enhance the process of drafting outsourcing contracts. The analysis indicates that the use of an agile method, such as Scrum, can be beneficial in this context...

  12. Supply contract and portfolio insurance

    Science.gov (United States)

    Runsheng Yin; Bob Izlar

    2001-01-01

    The long-term growth of institutional timberland investments depends on the ability of timberland investment management organizations (TIMO) to deal effectively with securitization, leveraging, arbitraging, supply contracting, portfolio insurance, tax efficiency enhancement, and other issues. Financial engineering holds great promise for many of these issues. This...

  13. Do Experiences with Medicare Managed Care Vary According to the Proportion of Same-Race/Ethnicity/Language Individuals Enrolled in One's Contract?

    Science.gov (United States)

    Price, Rebecca Anhang; Haviland, Amelia M; Hambarsoomian, Katrin; Dembosky, Jacob W; Gaillot, Sarah; Weech-Maldonado, Robert; Williams, Malcolm V; Elliott, Marc N

    2015-01-01

    Objective To examine whether care experiences and immunization for racial/ethnic/language minority Medicare beneficiaries vary with the proportion of same-group beneficiaries in Medicare Advantage (MA) contracts. Data Sources/Study Setting Exactly 492,495 Medicare beneficiaries responding to the 2008–2009 MA Consumer Assessment of Healthcare Providers and Systems (CAHPS) Survey. Data Collection/Extraction Methods Mixed-effect regression models predicted eight CAHPS patient experience measures from self-reported race/ethnicity/language preference at individual and contract levels, beneficiary-level case-mix adjustors, along with contract and geographic random effects. Principal Findings As a contract's proportion of a given minority group increased, overall and non-Hispanic, white patient experiences were poorer on average; for the minority group in question, however, high-minority plans may score as well as low-minority plans. Spanish-preferring Hispanic beneficiaries also experience smaller disparities relative to non-Hispanic whites in plans with higher Spanish-preferring proportions. Conclusions The tendency for high-minority contracts to provide less positive patient experiences for others in the contract, but similar or even more positive patient experiences for concentrated minority group beneficiaries, may reflect cultural competency, particularly language services, that partially or fully counterbalance the poorer overall quality of these contracts. For some beneficiaries, experiences may be just as positive in some high-minority plans with low overall scores as in plans with higher overall scores. PMID:25752334

  14. EFFECTS OF COMMERCIAL CONTRACT

    OpenAIRE

    Ana-Maria Florea; Constantin Giurca

    2014-01-01

    The contract is a legal instrument used to organize economic and social life. International trade agreement has certain features in order to ensure the international exchange of goods and services between the Contracting Parties. In terms of commercial contract, there is a foreign origin element, that gives the parties the right to determine the law to govern the contract. A fundamental aspect of commercial contract, in addition to that of determining the law applicable to judicial report est...

  15. Making contracting work better and cost less: Report of the Contract Reform Team

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In June 1993, Secretary of Energy Hazel O`Leary formed a Contract Reform Team, chaired by Deputy Secretary Bill White, to evaluate the contracting practices of the Department of Energy and to formulate specific proposals for improving those practices. This report summarizes the results of the work of the Contract Reform Team. It recommends actions for implementation that will significantly improve the Department`s contracting practices and will enable the Department to help create a government that -- in the words of Vice President Gore -- {open_quotes}works better and costs less.{close_quotes} These actions and the deadlines for their implementation are listed. Among other things, they recommend replacing the Department`s standard Management and Operating Contract with a new Performance-Based Management Contract and strengthening the Department`s systems for selecting and managing contractors.

  16. 48 CFR 246.710 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... OF DEFENSE CONTRACT MANAGEMENT QUALITY ASSURANCE Warranties 246.710 Contract clauses. (1) Use a clause substantially the same as the clause at 252.246-7001, Warranty of Data, in solicitations and... warranty clauses prescribed in FAR Part 46. (2) Use the clause at 252.246-7001, Warranty of Data, with its...

  17. 42 CFR 422.504 - Contract provisions.

    Science.gov (United States)

    2010-10-01

    ...) Communication with CMS. The MA organization must have the capacity to communicate with CMS electronically. (c..., contracts, and subcontracts. (vi) Franchise, marketing, and management agreements. (vii) Schedules of... contract on a document that certifies (based on best knowledge, information, and belief) the accuracy...

  18. Flawed Execution: A Case Study on Operational Contract Support

    Science.gov (United States)

    2016-06-01

    services as a whole have done a poor job of teaching their leaders how to effectively plan for and manage operational contract support, starting...with requirements generation and continuing to post-award contract management. The objective of this research is to develop a case study for use in...United States’ military mission and general interests. 14. SUBJECT TERMS operational contract support, contracting, theater support

  19. Impact of the pay-for-performance contract and the management of hypertension in Scottish primary care: a 6-year population-based repeated cross-sectional study.

    LENUS (Irish Health Repository)

    Simpson, Colin R

    2011-07-01

    The 2004 introduction of the pay-for-performance contract has increased the proportion of income that GPs are able to earn by targeting quality care to patients with chronic diseases such as hypertension.

  20. Performance contracting in central government in Denmark

    DEFF Research Database (Denmark)

    Kristiansen, Mads Bøge

    2015-01-01

    in Danish central government. Since their introduction, performance contracts have become central elements in the steering and management of agencies in central government in Denmark, and today they are nearly universally adopted in central government. In Denmark, the Ministry of Finance is responsible...... in organisational structure, tasks, culture and time with performance contracts is expected to affect the contract content, hypotheses on variation across agencies are deduced. The empirical basis of the paper is a study of all performance contracts between parent ministries and subordinate agencies in Danish...

  1. ADMINISTRATIVE CONTRACTS. DELIMITATIONS

    Directory of Open Access Journals (Sweden)

    Liana Teodora PASCARIU

    2016-12-01

    Full Text Available Article examines whether all contracts of public persons are administrative contracts; in other words, if the administration may conclude contracts that, according to their legal nature, are not administrative. If we start from the definition of administrative contracts as it appears in Law no. 554/2004, these include contracts by public authorities which concern the enhancement of public property execution of works of public interest, public services, public procurement and other administrative contracts provided by special laws and subject to the jurisdiction of the administrative courts.

  2. U.S. Army Contracting CommandRock Island Needs to Improve Contracting Officers Representative Training and Appointment for Contingency Contracts

    Science.gov (United States)

    2015-07-10

    Contracting Command–Rock Island (ACC–RI) awarded a firm-fixed price, indefinite-delivery indefinite-quantity contract W52P1J-15-D-0001 to Crowley Logistics ...operations in Liberia and Senegal. The scope of PWS B included: o task order management; o inbound material control; o warehousing ; o receiving...Contracting Authority, and Responsibilities.” 7 DoD Contingency COR Handbook, Version 2, September 2012, Chapter 2, Roles and Responsibilities for Contract

  3. 48 CFR 51.205 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management System (IFMS... Fleet Management System (IFMS) Vehicles and Related Services, in solicitations and contracts when a cost... interagency fleet management system (IFMS) vehicles and related services. FAR Index Federal Acquisition...

  4. Contingency Contracting Customer Guide

    Science.gov (United States)

    1996-12-01

    deployed contracting officer to train individual customers on the process, the customer support guide provides the necessary explanations without...straining valuable manpower resources. The Contracting Deployment Customer Guide aids the customer in contingency situations and addresses purchase requests

  5. Contractibility of curves

    Directory of Open Access Journals (Sweden)

    Janusz Charatonik

    1991-11-01

    Full Text Available Results concerning contractibility of curves (equivalently: of dendroids are collected and discussed in the paper. Interrelations tetween various conditions which are either sufficient or necessary for a curve to be contractible are studied.

  6. The effect of the UK incentive-based contract on the management of patients with coronary heart disease in primary care.

    Science.gov (United States)

    McGovern, Matt P; Boroujerdi, Massoud A; Taylor, Michael W; Williams, David J; Hannaford, Philip C; Lefevre, Karen E; Simpson, Colin R

    2008-02-01

    The new General Medical Services (nGMS) contract was introduced in April 2004 to improve care of chronic diseases such as coronary heart disease (CHD) and reduce differences in treatment between patient subgroups. To determine whether the recording of CHD-related health indicators and prescribing of medicines have increased following the introduction of the nGMS contract and whether differences in the treatment of patients of differing age, gender and deprivation have been affected. A serial cross-sectional study carried out with 310 general practices in Scotland. The subjects were patients with CHD as identified by their GP. Main outcome measures were the recording of CHD-related health indicators and prescribing of medicines at pre- and post-contract time points (covariates: gender, age, co-morbidity, deprivation and practice size). The recording of CHD-related quality indicators and prescribing increased dramatically (mean absolute increase of 17.1%) after the introduction of the nGMS contract. Post-contract, disparities between patient subgroups, continued for certain components of care. Women were less likely to be recorded than men in 9 of 11 components of care, with older patients (7 of 11 components of care) and the most deprived (4 of 11 components of care) also less likely to have a record than the youngest and least deprived, respectively. The introduction of the new contract was associated with a dramatic rise in the recording of CHD-related quality indicators. However, not all the population benefited equally for certain aspects of care.

  7. Contracting in Complex Operations: Toward Developing a Contracting Framework for Security Sector Reconstruction and Reform

    Science.gov (United States)

    2014-01-01

    focuses on contract design, management, and monitoring, and on contract workforce and capacity issues. His 2013 book , Complex Contracting...University Press and received the American Society for Public Administration’s Best Book Award (2014). His other publications have appeared in well- 3...setting and another minimum of six months of probationary supervision in the field. Given limitations in a combat zone, including widespread illiteracy

  8. Phase Zero Contracting Operations-Strategic and Integrative Planning for Contingency and Expeditionary Operations

    Science.gov (United States)

    2013-10-01

    Purchase Agreement; COCO = Chief of Contracting Office; DO = Delivery Order; FOO = Field Ordering Officer; HCA = Head of Contracting Activity; JRSOI...Transportation; Interpreter; Heavy Equipment; Latrine and Showers; Petroleum, Oil and Lubricants; Oce Support; and Laundry Additional Quality of...and COCO ) REQUIREMENTS PLANNING CONTRACT FORMATION CONTRACT ADMINISTRATION Customer Relationship Management Vendor Management Requirement Generation

  9. 41 CFR 109-45.304-50 - Processing bids and awarding of contracts.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Processing bids and awarding of contracts. 109-45.304-50 Section 109-45.304-50 Public Contracts and Property Management Federal Property Management Regulations System (Continued) DEPARTMENT OF ENERGY PROPERTY MANAGEMENT REGULATIONS...

  10. 41 CFR 102-38.275 - To whom do we award the sales contract?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false To whom do we award the sales contract? 102-38.275 Section 102-38.275 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION PERSONAL PROPERTY 38-SALE OF PERSONAL...

  11. Contract Driven Creation and Operation of Virtual Enterprises

    NARCIS (Netherlands)

    Hoffner, Yigal; Field, Simon; Grefen, P.W.P.J.; Ludwig, Heiko

    2001-01-01

    This paper examines the support needed for dynamically creating and managing contract-driven virtual enterprises. Our approach to virtual enterprises views contracts as the central theme that runs throughout the enterprises' life cycle and touches upon all major aspects thereof. A Contract Framework

  12. Contracts in distributed systems

    Directory of Open Access Journals (Sweden)

    Massimo Bartoletti

    2011-07-01

    Full Text Available We present a parametric calculus for contract-based computing in distributed systems. By abstracting from the actual contract language, our calculus generalises both the contracts-as-processes and contracts-as-formulae paradigms. The calculus features primitives for advertising contracts, for reaching agreements, and for querying the fulfilment of contracts. Coordination among principals happens via multi-party sessions, which are created once agreements are reached. We present two instances of our calculus, by modelling contracts as (i processes in a variant of CCS, and (ii as formulae in a logic. With the help of a few examples, we discuss the primitives of our calculus, as well as some possible variants.

  13. New insights into old theories: contracting relationships and the separation of powers.

    Science.gov (United States)

    Dudley, L S

    1997-01-01

    The continual frustration expressed in the literature about contracting is usually placed in the frame of political economy, contract regimes or interorganizational behavior. This article proposes that two conceptual omissions in the literature, an understanding of the separation of powers and the acknowledgment of different types of contracting situations, can complement the contracting literature. The article describes the author's observation of the contracting process from a study of four federal contracting situations under the Circular A-76 process and compares these observations with examples of state contracting of social services. Recommendations include recognition of the value configurations surrounding governmental processes and types of contracting as an aid to improving contracting management techniques.

  14. Comparing contracting performance: Culture, competition, contracts, capabilities and collaboration in UK and Scandinavia

    DEFF Research Database (Denmark)

    Lindholst, Andrej Christian

    One key question for the last three decades of public management reforms is whether country differences between radical and modest reform approaches make a difference for performance in a reformed public sector. This paper compares differences in the implementation and performance of contracting...... out, i.e. private delivery of public services, between the United Kingdom and Scandinavia. The reform approach in the United Kingdom are argued to have generated a ‘deep’ contracting culture embedding stronger contracting institutions than the more ‘shallow’ contracting cultures in Scandinavia....... Hypotheses are suggested for the role of culture, competition, contracts, capabilities and collaboration for contracting performance between and across the countries. Arguments are tested against data from on four comparable national surveys of private delivery of park and road maintenance services in local...

  15. New staff contract policy

    CERN Multimedia

    HR Department

    2006-01-01

    Following discussion at TREF and on the recommendation of the Finance Committee, Council approved a new staff contract policy, which became effective on 1 January 2006. Its application is covered by a new Administrative Circular No. 2 (Rev. 3) 'Recruitment, appointment and possible developments regarding the contractual position of staff members'. The revised circular replaces the previous Circulars No. 9 (Rev. 3) 'Staff contracts' and No. 2 (Rev. 2) 'Guidelines and procedures concerning recruitment and probation period for staff members'. The main features of the new contract policy are as follows: The new policy provides chances for long-term employment for all staff recruits staying for four years without distinguishing between those assigned to long-term or short-term activities when joining CERN. In addition, it presents a number of simplifications for the award of ICs. There are henceforth only 2 types of contract: Limited Duration (LD) contracts for all recruitment and Indefinite Contracts (IC) for...

  16. Contracting in crisis intervention.

    Science.gov (United States)

    Nelson, Z P; Mowry, D D

    1976-01-01

    The use of contracts in the social services is an important area that needs to be looked at. This paper is concerned specifically with the use of contracts in one particular part of social services: crisis intervention. Contracts that define the working relationship between the client and mental health counselor can be beneficial for both when they attempt to solve the problems that contributed to the crisis situation. There are five benefits to be gained from the use of contracts in crisis intervention and they are briefly discussed.

  17. Smart contracts sobre Bitcoin

    OpenAIRE

    Andreu Alemany, Josep Miquel

    2016-01-01

    El present treball final de màster realitza una introducció als smart contracts. El treball introdueix el concepte de contracte intel·ligent, els seus usos i alguns exemples existents. Seguidament proporciona les nocions necessàries de les transaccions del protocol Bitcoin per poder implementar un contracte intel·ligent, usant la blockchain que ofereix el protocol. Per últim, s'explica la implementació d'un contracte intel·ligent usant bitcoin: un canal de micropagaments. El presente traba...

  18. Contracting Practices at Air Force Laboratory Facilities

    Science.gov (United States)

    2007-09-28

    Procurement of services ; management structure,” December 2001, discusses contracting responsibilities of designated officials to ensure the services...Defense to establish a management structure for the procurement of services for DoD. It was determined within the Air Force that research and

  19. A Behavioral Approach towards Futures Contract Usage

    NARCIS (Netherlands)

    Pennings, J.M.E.; Leuthold, R.M.

    2001-01-01

    We propose a behavioural decision-making model to investigate what factors, observable as well as unobservable, owner-managers consider regarding futures contract usage. The conceptual model consists of two phases, reflecting the two-stage decision structure of manager's use of futures. In the first

  20. 78 FR 72572 - Operational Contract Support

    Science.gov (United States)

    2013-12-03

    ... military personnel necessary to execute contract oversight; and, (4) standards of medical care for deployed... procedurally close gaps and ensure the correct planning, oversight and management of DoD contractors supporting..., oversight and management of DoD contractors supporting contingency operations, by updating outdated policy...

  1. Performance-based contracts for road projects comparative analysis of different types

    CERN Document Server

    Gajurel, Ashish

    2014-01-01

    This book focuses on the aspects of contracting contracts, basically related to road construction and management contracts. The book presents an analytical study of Performance-Based Road Management and Maintenance (PMMR), Funktionsbauvertrag (FBV) (Function-Based Construction Contract) and Public Private Partnerships (PPP). A separate chapter is also included about the comparative study of these contract types. The book provides useful material for university libraries, construction companies and government departments of construction.

  2. 25 CFR 163.20 - Execution and approval of contracts.

    Science.gov (United States)

    2010-04-01

    ....20 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GENERAL FORESTRY REGULATIONS Forest Management and Operations § 163.20 Execution and approval of contracts. (a) All contracts... and disbursement of payments for timber and the forest management deductions from such payments. (4...

  3. Contracting out local services

    DEFF Research Database (Denmark)

    Petersen, Ole Helby; Houlberg, Kurt; Ring Christensen, Lasse

    2015-01-01

    Governments face a fundamental choice between in-house production and contracting out for the delivery of services to citizens. This article examines the importance of ideology, fiscal pressure, and size for contracting out in technical and social services. The analysis builds on a panel data set...... that the size effect is contingent on the transaction cost characteristics of the service....

  4. Gas contracts in transition

    Energy Technology Data Exchange (ETDEWEB)

    Wright, A.J. [Delhi Gas Pipeline Corp., Dallas, TX (United States)

    1992-12-31

    The transition of gas marketing by producers from a regulated and structured market to an open competitive and commodity market has created new challenges for attorneys drafting gas sales contracts. This article examines the following related topics: Interruptible contracts; pricing provisions; transport imbalances.

  5. BOT Outsourcing Contracts

    DEFF Research Database (Denmark)

    Ørberg Jensen, Peter D.; Petersen, Bent

    2012-01-01

    -firm linkages) and develop three scenarios for the implications for vendor firms. We find that BOT contracts, under certain circumstances, may imply benefits of process and knowledge upgrading for the emerging market vendor firm. However, given different sets of circumstances, engaging in a BOT contract carries...

  6. Partnering and contracting

    DEFF Research Database (Denmark)

    Bohnstedt, Kristian Ditlev

    2014-01-01

    Purpose - Partnering is often, by economists, and construction managerial literature related to more incomplete contracts. This can be explained by seeing partnering as something that neutralizes opportunism. The aim is to uncover whether partnering neutralizes opportunism when there is an incomp......Purpose - Partnering is often, by economists, and construction managerial literature related to more incomplete contracts. This can be explained by seeing partnering as something that neutralizes opportunism. The aim is to uncover whether partnering neutralizes opportunism when...... there is an incomplete contract or reduces transaction costs for renegotiation of complete contracts when new information arises. Design - The study is a cross-sectional design comprising document analysis and interviews. Findings - Firstly that partnering does not necessarily entail more incomplete contracts, which...... contradicts the incomplete contracting theory. Secondly, in complete contract setting partnering can be motivated when seen as a willingness to renegotiate complete contracts i.e. partnering lowers transaction costs for renegotiation. Partnering can make it rational for one party to accept disadvantageous...

  7. Contracting for Telecommunications Systems.

    Science.gov (United States)

    Brautigam, Arthur W.

    1984-01-01

    Reasons for changing telephone systems at colleges and universities and the preparation and evaluation of requests for proposals (RFP) are discussed. The negotiation and monitoring of the contract are also addressed. It is noted that contracting for a new telecommunications system is extremely complex. Reasons for changing systems include cost…

  8. Contracting Productivity Growth

    NARCIS (Netherlands)

    Francois, P.; Roberts, J.

    2001-01-01

    In this paper, we analyze the interactions between growth and the contracting environment in the production sector.Allowing incompleteness in contracting implies that viable production relationships for firms and workers, and therefore the profitability of industries, depend on the rates of

  9. Contract Teachers in India

    Science.gov (United States)

    Goyal, Sangeeta; Pandey, Priyanka

    2013-01-01

    In this paper, we use non-experimental data from government schools in Uttar Pradesh and Madhya Pradesh, two of the largest Indian states, to present average school outcomes by contract status of teachers. We find that contract teachers are associated with higher effort than civil service teachers with permanent tenures, before as well as after…

  10. Contract Training for Industry.

    Science.gov (United States)

    Averill, Donald F.

    1983-01-01

    Describes contract training whereby industries arrange with community colleges, technical institutes, and vocational schools to prepare employees for specific job assignments. Indicates that industrial training performed under contract with public institutions should be encouraged in favor of expansion of training that industry performs for…

  11. Contribution to contract theory

    Directory of Open Access Journals (Sweden)

    Pantelić Svetlana

    2016-01-01

    Full Text Available Oliver Hart and Bengt Holmstrom share the Nobel Prize in Economic Sciences for 2016, awarded to them by Sveriges Riksbank. They have been rewarded for their work in enhancing the design of contracts, i.e. arrangements connecting employers with employees or companies with clients, in other words, for their contribution to contract theory in the 1970s and 1980s. Their analysis of optimal contractual arrangements lays an intellectual foundation for designing policies and institutions in many areas, from bankruptcy legislation to political constitutions. Hart is an expert in contract theory, theory of the firm, corporate finance, and law and economics. His contribution to contract theory is exquisite when it comes to designing contracts which cover eventualities that cannot be precisely specified in advance.

  12. Bunker purchasing with contracts

    DEFF Research Database (Denmark)

    Plum, Christian Edinger Munk; Neergaard Jensen, Peter; Pisinger, David

    2014-01-01

    constraints such as capacity limits, reserve requirements and sulphur content. Contracts are often used for bunker purchasing, ensuring supply and often giving a discounted price. A contract can supply any vessel in a period and port, and is thus a shared resource between vessels, which must be distributed...... optimally to reduce overall costs. The Bunker Purchasing with Contracts Problem has been formulated as a mixed integer programme, which has been Dantzig-Wolfe decomposed. To solve it, a novel column generation algorithm has been developed. The algorithm has been run on a series of real-world instances...... with up to 500+ vessels and 500+ contracts, and provide near optimal solutions. This makes it possible for a major liner shipping company to plan bunker purchasing on a global level, and provides an efficient tool for assessing new contracts....

  13. THE PSYCHOLOGICAL CONTRACT

    Directory of Open Access Journals (Sweden)

    Blanca Giorgiana GRAMA

    2015-04-01

    Full Text Available The psychological contract became known as a research paradigm within corporate research, providing a broad framework which explains the employee-company relations. Despite all this, there are still many debates on the concept and a series of criticism were expressed that led to the necessity of some more rigorous theoretical and empirical analysis. The psychological contract refers to the unwritten, implicit expectations that employees have from the company and vice versa; it is that which defines the things the employee expects from the employer. Consequently, each of the parties involved in the contract may have different perceptions on these commitments and obligations. Thus the psychological contract may be regarded as an exchange relation between the employer and the employee. Breaking the psychological contract affects the performance, the morale, and the motivation of the staff in a negative manner. The information presented in this paper is intended to contribute to the theoretical and methodological development of the concept.

  14. How do we actually put smarter snacks in schools? NOURISH (Nutrition Opportunities to Understand Reforms Involving Student Health) conversations with food-service directors.

    Science.gov (United States)

    Rosenfeld, Lindsay E; Cohen, Juliana Fw; Gorski, Mary T; Lessing, Andrés J; Smith, Lauren; Rimm, Eric B; Hoffman, Jessica A

    2017-02-01

    In autumn 2012, Massachusetts schools implemented comprehensive competitive food and beverage standards similar to the US Department of Agriculture's Smart Snacks in School standards. We explored major themes raised by food-service directors (FSD) regarding their school-district-wide implementation of the standards. For this qualitative study, part of a larger mixed-methods study, compliance was measured via direct observation of foods and beverages during school site visits in spring 2013 and 2014, calculated to ascertain the percentage of compliant products available to students. Semi-structured interviews with school FSD conducted in each year were analysed for major implementation themes; those raised by more than two-thirds of participating school districts were explored in relationship to compliance. Massachusetts school districts (2013: n 26; 2014: n 21). Data collected from FSD. Seven major themes were raised by more than two-thirds of participating school districts (range 69-100 %): taking measures for successful transition; communicating with vendors/manufacturers; using tools to identify compliant foods and beverages; receiving support from leadership; grappling with issues not covered by the law; anticipating changes in sales of competitive foods and beverages; and anticipating changes in sales of school meals. Each theme was mentioned by the majority of more-compliant school districts (65-81 %), with themes being raised more frequently after the second year of implementation (range increase 4-14 %). FSD in more-compliant districts were more likely to talk about themes than those in less-compliant districts. Identified themes suggest best-practice recommendations likely useful for school districts implementing the final Smart Snacks in School standards, effective July 2016.

  15. Technology to engage hospitalised patients in their nutrition care: a qualitative study of usability and patient perceptions of an electronic foodservice system.

    Science.gov (United States)

    Roberts, S; Marshall, A P; Gonzalez, R; Chaboyer, W

    2017-10-01

    Active patient involvement in nutrition care may improve dietary intakes in hospital. Our team is developing an innovative programme allowing patients to self-assess and self-monitor their nutrition at the bedside. The present study aimed to assess usability and patient perceptions of an electronic foodservice system (EFS) for participating in nutrition care. This qualitative study was conducted in an Australian tertiary hospital. Participants were sampled purposively and included patients who were able to provide informed consent and communicate in English. Patient interviews were conducted at the bedside and consisted of: (i) usability testing of the EFS using 'Think Aloud' technique and (ii) questioning using a semi-structured interview guide to understand perceptions of the EFS. Interview data were analysed using inductive content analysis. Thirty-two patients were interviewed. Their perceptions of using the EFS to participate in nutrition care were expressed in five categories: (i) Familiarity with technology can affect confidence and ability but is not essential to use EFS; (ii) User interface design significantly impacts EFS usability; (iii) Identifying benefits to technology increases its acceptance; (iv) Technology enables participation, which occurs to varying extents; and (v) Degree of participation depends on perceived importance of nutrition. Patients found the EFS acceptable and acknowledged benefits to its use. Several factors appeared to influence usability, acceptability and willingness to engage with the system, such as user interface design and perceived ease of use, benefits and importance. The present study provides important insights into designing technology-based interventions for engaging inpatients in their nutrition care. © 2017 The British Dietetic Association Ltd.

  16. 48 CFR 46.707 - Pricing aspects of fixed-price incentive contract warranties.

    Science.gov (United States)

    2010-10-01

    ...-price incentive contract warranties. 46.707 Section 46.707 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Warranties 46.707 Pricing aspects of fixed-price incentive contract warranties. If a fixed-price incentive contract contains a warranty (see...

  17. ENFORCEMENT OF MORTGAGE CONTRACT

    Directory of Open Access Journals (Sweden)

    Alisa A. BELU

    2016-07-01

    Full Text Available A chattel mortgage contract is the expression of a real guarantee that gives the creditor precedence over other creditors, in addition to the general pledge upon the belongings of the debtor. It refers to the sale of mortgaged movable assets, exclusively or prioritized in favor of the mortgaging creditor, in case the debtor does not comply with his / her commitments, under the signed mortgage contract. Beginning from this purpose, shared by both sides (as the chattel mortgage contract is synallagmatic, in case the debtor is unable to fulfill his / her commitments, the sides reach a situation of enforcement of the signed chattel mortgage contract. Given the legal status of the chattel mortgage contract [Art. 2387-2477 Noul Cod Civil , Universul Juridic, Bucureşti, 2016, ISBN 978-606-673-792-0], the principle of binding force of the contract and the principle according to which signed legal conventions will entail legal effects, the Romanian law maker developed the proper legal framework for the enforcement of the chattel mortgage contract. [art. 622 si urm. Noul Cod de Procedură Civilă, ed. Hamangiu, Bucureşti, 2016, ISBN 978-606-27-0459-9].

  18. Capitated contracting of integrated health provider organizations.

    Science.gov (United States)

    Bazzoli, G J; Dynan, L; Burns, L R

    This paper examines global capitation of integrated health provider organizations that link physicians and hospitals, such as physician-hospital organizations and management service organizations. These organizations have proliferated in recent years, but their contracting activity has not been studied. We develop a conceptual model to understand the capitated contracting bargaining process. Exploratory multivariate analysis suggests that global capitation of these organizations is more common in markets with high health maintenance organization (HMO) market share, greater numbers of HMOs, and fewer physician group practices. Additionally, health provider organizations with more complex case mix, nonprofit status, more affiliated physicians, health system affiliations, and diversity in physician organizational arrangements are more likely to have global capitation. Finally, state regulation of provider contracting with self-insured employers appears to have spillover effects on health plan risk contracting with health providers.

  19. 41 CFR 102-38.315 - Are we required to use Alternative Disputes Resolution for sales contracts?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Are we required to use Alternative Disputes Resolution for sales contracts? 102-38.315 Section 102-38.315 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT...

  20. Temporary labour contracts

    CERN Document Server

    1999-01-01

    The five contracts for Temporary Labour assignments on the CERN site (L020/PE, L021/PE, L022/PE, L023/PE and L024/PE) approved by the Finance Committee in March 1996 (CERN/FC/3857) will reach the end of their initial three-year contractual period at the end of December 1999. Following the satisfactory execution of these contracts during this period, CERN requests approval to extend them from January 2000 for the first of the two years foreseen in the original adjudication. The Finance Committee is invited: - to take note that the three-year expenditure for Temporary Labour contracts from 1997 to 1999 will not exceed 19 100 000 Swiss francs, compared to the 18 900 000 Swiss francs estimated at the time of the adjudication in March 1996; - to approve an extension of the present Temporary Labour contracts for the year 2000 for a total amount not exceeding 6 000 000 Swiss francs.

  1. Premature Ventricular Contractions (PVCs)

    Science.gov (United States)

    ... Premature ventricular contractions (PVCs) Symptoms & causes Diagnosis & treatment Advertisement Mayo Clinic does not endorse companies or products. ... a Job Site Map About This Site Twitter Facebook Google YouTube Pinterest Mayo Clinic is a not- ...

  2. Superfund Contract Laboratory Program

    Science.gov (United States)

    The Contract Laboratory Program (CLP) is a national network of EPA personnel, commercial laboratories, and support contractors whose primary mission is to provide data of known and documented quality to the Superfund program.

  3. Contracting the Facebook API

    Directory of Open Access Journals (Sweden)

    Ben Rubinger

    2010-09-01

    Full Text Available In recent years, there has been an explosive growth in the popularity of online social networks such as Facebook. In a new twist, third party developers are now able to create their own web applications which plug into Facebook and work with Facebook's "social" data, enabling the entire Facebook user base of more than 400 million active users to use such applications. These client applications can contain subtle errors that can be hard to debug if they misuse the Facebook API. In this paper we present an experience report on applying Microsoft's new code contract system for the .NET framework to the Facebook API.We wrote contracts for several classes in the Facebook API wrapper which allows Microsoft .NET developers to implement Facebook applications. We evaluated the usefulness of these contracts during implementation of a new Facebook application. Our experience indicates that having code contracts provides a better and quicker software development experience.

  4. An unsatisfactory contract policy

    CERN Multimedia

    Association du personnel

    2012-01-01

    For the last 15 years contract policy has been one of the top priorities of CERN staff, as expressed in successive surveys initiated by the Staff Association. In one’s professional life, having some forward vision of one’s career prospects is the key to loyalty and motivation. On the contrary, instability about the future is always at the root of anxiety, conflicts, or even health problems. A good employer must therefore balance the needs of the Company and those of its employees. CERN’s current contract policy, as described in the Administrative Circular No 2, states that staff members should first obtain a limited duration (LD) contract of up to five years. Then, if they want to stay in the Organization, staff members must apply, usually once a year, and before the end of their LD contract, for an indefinite contract (IC) post. All candidates for an IC post are considered by the Review Board for the award of indefinite contracts (Review Board) which will choose the most suita...

  5. Software Support for Industrial Controls Contract

    CERN Document Server

    Sánchez-Corral, E

    2001-01-01

    The contract covers the development and the operation and maintenance (O&M) of the monitoring and control systems used for supervising CERN's technical infrastructure. The contract involves those responsible for equipment in any current or future technical installation. We are outsourcing a complex activity which will require efforts on both preparing the specifications for new projects and setting clear definitions of tasks and procedures for O&M. It is a result-oriented contract in which performance will be continually evaluated by different methods and tools: project management plan and project follow-up, and CAMMS (Computerised Assets and Maintenance Management system). To be used effectively, this approach requires complete traceability of activities and documentation of the systems. Based on the analysis of the results measured and the shared (CERN and contractor) experience, the O&M activities will be reviewed and reorganised and operational procedures will be changed according to needs. A ...

  6. Improving Contract Performance by Corrective Actions Plans

    Energy Technology Data Exchange (ETDEWEB)

    Dowd, A.S., jr.

    2002-06-23

    Corrective Action Plans (CAPs) are required to be developed, submitted, and reported upon by the prime contractors for the U.S. Department of Energy (U.S. DOE) Management and Operations (M and O) contracts. The best known CAP ''type,'' and there are many, is for Price-Anderson Amendments Act (PAAA) ''potential noncompliances.'' The M and O contractor fines for PAAA problems have increased from approximately $100,000 in 1996 to almost $2,000,000 in 2000. In order to improve CAP performance at the National Nuclear Security Administration (NNSA) site at Y-12 in Oak Ridge, Tennessee, the contractor chose to centralize the company-wide processes of problem identification and reporting with the PAAA (and other) CAP processes. This directly integrates these functional reports to the contractor General Manager. The functions contained in the M and O contractor central organization, called ''Performance Assurance,'' are: PAAA; Defense Nuclear Facilities Safety Board (DNFSB) Liaison; Contract Requirements Management; Issues Management (including the CAP processes); Lessons Learned; Independent and Management Assessments; Internal Audits; and Ethics. By centrally locating and managing these problem identification and problem correction functions, the contractor, BWXT Y-12, L.L.C., has improved PAAA (and other) CAP performance more than 200 percent in the first year of the contract. Much of this improvement (see Table 1 for examples) has been achieved by increasing the knowledge and experience of management and workers in the specific contract and company requirements for CAPs. The remainder of this paper will describe some of the many CAP processes at Y-12 to show the reader the non-trivial scope of the CAP process. Improvements in CAP management will be discussed. In addition, a specific recommendation for CAP management, in a major capital construction project, will be presented.

  7. Hortaliças in natura ou minimamente processadas em unidades de alimentação e nutrição: quais aspectos devem ser considerados na sua aquisição? Fresh or minimally processed vegetables in foodservices: what aspects should be considered when purchasing them?

    Directory of Open Access Journals (Sweden)

    Gabriel Carvalho Degiovanni

    2010-10-01

    costs of gross weight considering the correction for net yield were compared with the costs of minimally processed vegetables supplied by the manufacturer during two different periods. Results The costs of minimally processed zucchini, carrot, chayote and arracacha were 8.6%, 14.1%, 4.6% and 13.5% lower than their respective fresh counterparts at time 1, a fact that did not repeat itself at time 2, when these vegetables were less expensive when bought fresh. Conclusion In conclusion, numerous factors associated or not with the food directly influence the magnitude of the losses that occur during processing. The working methods and final objectives of each foodservice should define which product is more advantageous since costs vary and production can be affected by seasonality and the supply and demand of the food item, with repercussions on the quality management of the foodservice.

  8. 48 CFR 970.3770 - Facilities management.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Facilities management. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Facilities Management Contracting 970.3770 Facilities management. ...

  9. Incomplete contract, bargaining and optimal divisional structure

    NARCIS (Netherlands)

    Bao, T.; Wang, Y.

    2012-01-01

    When complete contracting is not possible, allocating control structure becomes the second-best arrangement. This paper analyzes the design of optimal divisional structure within an organization where ex post bargaining between the potential divisional managers is possible. In much the same light as

  10. 7 CFR 1466.21 - Contract requirements.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Contract requirements. 1466.21 Section 1466.21 Agriculture Regulations of the Department of Agriculture (Continued) COMMODITY CREDIT CORPORATION, DEPARTMENT... practices, consistent with the provisions of § 1466.25; (iv) Implement a comprehensive nutrient management...

  11. linkage between psychological contract and employee retention ...

    African Journals Online (AJOL)

    GRACE

    One of the solutions for organizations to effectively and efficiently respond to these changes is to create a positive relationship between employers and employees (Curwen,. 2013), and embrace the use of human resource management practices and develop a psychological contract to improve on the corporate performance ...

  12. INDEFINITE CONTRACT REVIEW 2001

    CERN Multimedia

    Human Resources Division

    2001-01-01

    The Director-General has decided to review staff members in professional categories 2 to 5 satisfying the criteria for consideration for the award of an indefinite contract, in accordance with Article R II 1.20 of the Staff Regulations. Staff members holding a fixed-term contract which it has been decided not to renew will not be considered. The following stages are foreseen: 1. Candidates qualifying for review in accordance with Article R II 1.20 of the Staff Regulations and the Administrative Circular N° 9 will be contacted by Human Resources Division. 2. The criteria as to when staff members qualify for review are described in Administrative Circular N° 9. These include the following: staff members who are in their fourth year of service on a fixed-term contract; in addition, for staff members having three years or more of previous relevant service in the Organization on a contract of limited duration (or term-contract) and upon proposal by the division leader concerned, consideration fo...

  13. Energetics of contraction.

    Science.gov (United States)

    Barclay, C J

    2015-04-01

    Muscles convert energy from ATP into useful work, which can be used to move limbs and to transport ions across membranes. The energy not converted into work appears as heat. At the start of contraction heat is also produced when Ca(2+) binds to troponin-C and to parvalbumin. Muscles use ATP throughout an isometric contraction at a rate that depends on duration of stimulation, muscle type, temperature and muscle length. Between 30% and 40% of the ATP used during isometric contraction fuels the pumping Ca(2+) and Na(+) out of the myoplasm. When shortening, muscles produce less force than in an isometric contraction but use ATP at a higher rate and when lengthening force output is higher than the isometric force but rate of ATP splitting is lower. Efficiency quantifies the fraction of the energy provided by ATP that is converted into external work. Each ATP molecule provides 100 zJ of energy that can potentially be converted into work. The mechanics of the myosin cross-bridge are such that at most 50 zJ of work can be done in one ATP consuming cycle; that is, the maximum efficiency of a cross-bridge is ∼50%. Cross-bridges in tortoise muscle approach this limit, producing over 90% of the possible work per cycle. Other muscles are less efficient but contract more rapidly and produce more power. © 2015 American Physiological Society.

  14. INDEFINITE CONTRACT REVIEW 2000

    CERN Multimedia

    Division des ressources humaines

    2000-01-01

    The Director-General has decided to review staff members in professional categories 2 to 5 satisfying the criteria for consideration for the award of an indefinite contract, in accordance with Article R II 1.20 of the Staff Regulations. Staff members holding a fixed-term contract which it has been decided not to renew will not be considered. The following stages are foreseen:1.\tCandidates qualifying for review in accordance with Article R II 1.20 of the Staff Regulations and the Administrative Circular N° 9 will be contacted by Human Resources Division. 2.\tThe criteria as to when staff members qualify for review are described in Administrative Circular N° 9. These include the following:staff members who are in their fourth year of service on a fixed-term contract;in addition, for staff members having three years or more of previous relevant service in the Organization on a contract of limited duration (or term-contract) and upon proposal by the division leader concerned, consid...

  15. 48 CFR 1845.106-70 - NASA contract clauses and solicitation provision.

    Science.gov (United States)

    2010-10-01

    .... (3) The contracting officer shall identify in the contract the nature, quantity, and acquisition cost... will vest in the Government prior to delivery. (e) When approved by the Logistics Management Division...

  16. Amending Contracts for Choreographies

    Directory of Open Access Journals (Sweden)

    Laura Bocchi

    2011-07-01

    Full Text Available Distributed interactions can be suitably designed in terms of choreographies. Such abstractions can be thought of as global descriptions of the coordination of several distributed parties. Global assertions define contracts for choreographies by annotating multiparty session types with logical formulae to validate the content of the exchanged messages. The introduction of such constraints is a critical design issue as it may be hard to specify contracts that allow each party to be able to progress without violating the contract. In this paper, we propose three methods that automatically correct inconsistent global assertions. The methods are compared by discussing their applicability and the relationships between the amended global assertions and the original (inconsistent ones.

  17. Managed Care

    Science.gov (United States)

    Managed care plans are a type of health insurance. They have contracts with health care providers and ... probably cost more. There are three types of managed care plans: Health Maintenance Organizations (HMO) usually only ...

  18. Statutes and contracts

    DEFF Research Database (Denmark)

    Trosborg, Anna

    1995-01-01

    This paper is concerned with the language used in legal speech acts in legislative texts and contracts in the field of English Contract Law. The central objects of study are regulative functions with a particular view to establishing realization patterns of the rhetorical functions of directive...... and commissive acts. The findings show that the language of the law characteristically selects patterns of regulative distinct from, for example, the patterns typically selected in everyday conversational English. The characteristics of the language of the law can be interpreted within the adherence to legal...

  19. Do contracts help?

    DEFF Research Database (Denmark)

    Tumennasan, Norovsambuu

    Economists perceive moral hazard as an undesirable problem because it undermines efficiency. Carefully designed contracts can mitigate the moral hazard problem, but this assumes that a team is already formed. This paper demonstrates that these contracts are sometimes the reason why teams do...... transfers, then moral hazard affects stability positively in a large class of games. For example, a stable team structure exists if teams produce public goods or if the quota is two. However, these existence results no longer hold if efforts are verifiable....

  20. Contract litigation: prepare for war to ensure peace.

    Science.gov (United States)

    Martin, Kevin; Amir, Michael M

    2011-01-01

    Contract litigation can prove devastating for all but the deepest of pockets. Physicians need to prepare for war to ensure the most favorable outcome. This includes identifying your risks, negotiating from strength, and hedging your bets. Negotiate and read your contracts carefully. Beware of critical loser pays provisions in your contracts that will require you to pay your adversary's fees in the event of an adverse ruling at trial or summary judgment. Keep your insurance portfolio up to date, including the latest risk management tools, such as contract litigation insurance. Protect yourself and your practice by planning ahead.

  1. 3 CFR - Government Contracting

    Science.gov (United States)

    2010-01-01

    ... contract oversight could reduce such sums significantly. Government outsourcing for services also raises... commercial services used by the Government, such as transportation, food, and maintenance. Office of... governmental functions. Agencies and departments must operate under clear rules prescribing when outsourcing is...

  2. Culture and Contract Laws

    DEFF Research Database (Denmark)

    Lando, Ole

    2007-01-01

    In the article it is argued that the wish to preserve the cultural values of national law should not prevent the EU from preparing a Code or an Optional Instrument. The no-code countries on the British Isles and in Scandinavia are the most ardent opponents to the idea of unifying European Contract...

  3. Muscle contraction and force

    DEFF Research Database (Denmark)

    Brüggemann, Dagmar Adeline; Risbo, Jens; Pierzynowski, Stefan G.

    2008-01-01

    Muscle contraction studies often focus solely on myofibres and the proteins known to be involved in the processes of sarcomere shortening and cross-bridge cycling, but skeletal muscle also comprises a very elaborate ancillary network of capillaries, which not only play a vital role in terms of nu...... contributor to force transfer within muscular tissue....

  4. Joint Contingency Contracting

    Science.gov (United States)

    2005-06-01

    parents, Ellsworth K. Johnson, Jr. and Helen E. Johnson, for their lifelong love and support. Mom, thanks for always being there when I needed you...Hurricanes Charley , Jeanne and Andrew are examples of domestic disaster emergency relief. 2. Phases of Contingency Contracting Contingency

  5. Construction Contract Provisions Analysis.

    Science.gov (United States)

    1982-09-01

    tractor, and localized variations characteristic of the subsurface materials of the region are anticipated and if encountered, such variations will...34Contract drawings, maps, and specification. On larger projects, provide one set of sepias , both large scale and reduced, in addition to the contact

  6. Cognition and Incomplete Contracts

    OpenAIRE

    Jean Tirole

    2009-01-01

    Thinking about contingencies, designing covenants, and seeing through their implications is costly. Parties to a contract accordingly use heuristics and leave it incomplete. The paper develops a model of limited cognition and examines its consequences for contractual design. (JEL D23, D82, D86, L22)

  7. Municipalities' Contracting Out Decisions: An Emperical Study on Motives

    NARCIS (Netherlands)

    Groot, T.L.C.M.; Wassenaar, M.C.; Gradus, R.H.J.M.

    2013-01-01

    Municipalities have various motives behind their decisions about the modes of their task execution. Empirical studies have not yet provided a fully satisfying explanation for municipalities' contracting out decisions. Therefore, we interviewed several Dutch principal municipal managers to evaluate

  8. Utility Energy Services Contracts: Enabling Documents, May 2009 (Book)

    Energy Technology Data Exchange (ETDEWEB)

    2009-05-01

    Enabling Documents, delivered by the U.S. Department of Energy's Federal Energy Management Program (FEMP) to provide materials that clarify the authority for federal agencies to enter into utility energy services contracts (UESCs).

  9. Practical concepts in Contract Law

    OpenAIRE

    Ehsan, zarrokh

    2008-01-01

    A contract is a legally binding exchange of promises or agreement between parties that the law will enforce. Contract law is based on the Latin phrase pacta sunt servanda (literally, promises must be kept) [1]. Breach of a contract is recognised by the law and remedies can be provided. Almost everyone makes contracts everyday. Sometimes written contracts are required, e.g., when buying a house [2]. However the vast majority of contracts can be and are made orally, like buying a law text book,...

  10. Employee contract issues for dermatologists.

    Science.gov (United States)

    Brown, Christopher E; Indest, George F

    2013-12-01

    Employees and employers routinely face negotiating and preparing physician employment contracts. It is important for both sides to know and understand the basic information on what a comprehensive employment contract for a dermatologist should contain. There are various employment contract provisions from both the employee's perspective and the employer's perspective that must be considered when preparing physician employment contracts. This article provides basic advice and recommendations on requirements that should be included in such contracts. It suggests legal pitfalls that can be avoided through various contract clauses.

  11. Natural gas contracts in efficient portfolios

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, R.J.

    1994-12-01

    This report addresses the {open_quotes}contracts portfolio{close_quotes} issue of natural gas contracts in support of the Domestic Natural Gas and Oil Initiative (DGOI) published by the U.S. Department of Energy in 1994. The analysis is a result of a collaborative effort with the Public Service Commission of the State of Maryland to consider {open_quotes}reforms that enhance the industry`s competitiveness{close_quotes}. The initial focus of our collaborative effort was on gas purchasing and contract portfolios; however, it became apparent that efficient contracting to purchase and use gas requires a broader consideration of regulatory reform. Efficient portfolios are obtained when the holder of the portfolio is affected by and is responsible for the performance of the portfolio. Natural gas distribution companies may prefer a diversity of contracts, but the efficient use of gas requires that the local distribution company be held accountable for its own purchases. Ultimate customers are affected by their own portfolios, which they manage efficiently by making their own choices. The objectives of the DGOI, particularly the efficient use of gas, can be achieved when customers have access to suppliers of gas and energy services under an improved regulatory framework. The evolution of the natural gas market during the last 15 years is described to account for the changing preferences toward gas contracts. Long-term contracts for natural gas were prevalent before the early 1980s, primarily because gas producers had few options other than to sell to a single pipeline company, and this pipeline company, in turn, was the only seller to a gas distribution company.

  12. Safety Case for Service Contracts

    Energy Technology Data Exchange (ETDEWEB)

    Martinez, Israel L.

    2014-07-01

    Safety cases developed for the Facilities Management and Operations Center (FMOC) are based on the requirements in MN471021, Work Planning and Control Criteria for Safe Design and Operations. The FMOC performs maintenance activities in various locations at Sandia National Laboratories, New Mexico (SNL/NM). SNL/NM consists of more than 6,000,000 square feet of buildings, structures, and site infrastructure on approximately 13,000 acres of land. The FMOC performs approximately 7500 service contract work orders a year to assist with operations and maintenance at the SNL/NM site and facilities. As part of the continual improvement process, this Safety Case will be reviewed and updated, as needed, or at a minimum every three years.

  13. Navy construction contract regulations vs. the Board of Contract Appeals.

    OpenAIRE

    McMurray, Thomas David

    1987-01-01

    Approved for public release; distribution is unlimited This thesis addresses construction contracting in the United States Navy. It compares the Government construction contract regulations with decisions by the Boards of Contract Appeals. Nine topics are researched including submittal reviews, profit, change orders and changes, notices to proceed, acceleration, beneficial occupancy, weather delays, and extended overhead. The Boards' decisions are used to understand...

  14. What Managers do

    DEFF Research Database (Denmark)

    Ry Nielsen, Jens Carl

    2004-01-01

    Leadership, change management, mentoring, coaching, thinking in holistic terms, leadership development, contract management, project management, balanced score card, and benchmarking are terms that flourish in the newspapers, on leadership and management courses and programmes. The memoirs of gre...

  15. 76 FR 31998 - Posting of Service Contract Inventory

    Science.gov (United States)

    2011-06-02

    ... MANAGEMENT Posting of Service Contract Inventory AGENCY: Office of Personnel Management. ACTION: Notice of posting. SUMMARY: The Office of Personnel Management has posted on its public Web site an inventory of the... inventory was prepared in accordance with Section 743 of Division C of the FY 2010 Consolidated...

  16. Contracts for dispatchable power

    Energy Technology Data Exchange (ETDEWEB)

    Kahn, E.P.; Stoft, S.; Marnay, C.; Berman, D.

    1990-10-01

    Competitive bidding for electric power is maturing. Increasing numbers of utilities are soliciting proposals from private suppliers. The amount of capacity being sought is increasing, and potential suppliers appear to be abundant. Analysis of these developments still remains limited. Evidence on the behavior of this market is scarce and sketchy. The underlying economic principles that are shaping the market have not clearly been articulated. In this report we examine the economics of competitive bidding both empirically and analytically. Previous study of this market has focused on the evaluation criteria specified in Requests for Proposals (RFPs), and highly aggregated summary statistics on participation and results. We continue the examination of RFPs, but also survey the details of long term contracts that have emerged from competitive bidding. Contracts provide a new level of specific detail that has not been previously available. 68 refs., 13 figs., 25 tabs.

  17. Russian Contract Procurement Document

    Energy Technology Data Exchange (ETDEWEB)

    Tobin, J G

    2010-03-29

    This contract supports the enhancement of physical protection or nuclear material control and accounting systems at institutes or enterprises of the newly independent states under the material protection control and accounting (MPC&A) program. The contract is entered into pursuant to the MPC&A Program, a gratuitous technical assistance program, in accordance with the bilateral Agreements between the Russian Federation and the United States of America concerning the Safe and Secure Transportation, Storage and Destruction of Weapons and the Prevention of Weapons Proliferation of June 1992, as extended and amended by Protocol signed of June 1999, Agreement between the Government of the Russian Federation regarding Cooperation in the Area of Nuclear Materials Physical Protection, Control and Accounting of October 1999 and the Russian Federation law of May 1999 on the taxation exemption of gratuitous technical assistance with Russian Federation under registration No.DOE001000.

  18. Preliminary Results Towards Contract Monitorability

    Directory of Open Access Journals (Sweden)

    Annalizz Vella

    2016-05-01

    Full Text Available This paper discusses preliminary investigations on the monitorability of contracts for web service descriptions. There are settings where servers do not guarantee statically whether they satisfy some specified contract, which forces the client (i.e., the entity interacting with the server to perform dynamic checks. This scenario may be viewed as an instance of Runtime Verification, where a pertinent question is whether contracts can be monitored for adequately at runtime, otherwise stated as the monitorability of contracts. We consider a simple language of finitary contracts describing both clients and servers, and develop a formal framework that describes server contract monitoring. We define monitor properties that potentially contribute towards a comprehensive notion of contract monitorability and show that our simple contract language satisfies these properties.

  19. Utility Energy Services Contracts Guide

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    The UESC Guide is a compilation of samples and templates developed as a resource to help contracting officers implement task orders for UESCs under existing U.S. General Services Administration areawide contracts.

  20. The interpretation of administrative contracts

    Directory of Open Access Journals (Sweden)

    Cătălin-Silviu SĂRARU

    2014-06-01

    Full Text Available The article analyzes the principles of interpretation for administrative contracts, in French law and in Romanian law. In the article are highlighted derogations from the rules of contract interpretation in common law. Are examined the exceptions to the principle of good faith, the principle of common intention (willingness of the parties, the principle of good administration, the principle of extensive interpretation of the administrative contract. The article highlights the importance and role of the interpretation in administrative contracts.

  1. Why radiologists lose their hospital contracts: is your contract secure?

    Science.gov (United States)

    Muroff, Lawrence R

    2010-03-01

    Previously, a hospital contract meant tenure for the incumbent group of radiologists; however, those days are long gone. Exclusive contracts have morphed into exclusive contracts with carve-outs. Turf erosion has become a fact of life for radiology practices. Now radiologists are losing their hospital contracts in record numbers. Group size, though helpful for a variety of reasons, does not ensure that a practice will be secure in its hospital setting. The reasons that groups lose their hospital contracts are varied, and in this paper, the author discusses the most common ones. Suggestions to help practices avoid this unfortunate fate are presented.

  2. Pressure drop in contraction flow

    DEFF Research Database (Denmark)

    Rasmussen, Henrik Koblitz

    This note is a supplement to Dynamic of Polymeric Liquids (DPL) page 178. DPL gives an equation for the pressure drop in a tapered (and circular) contraction, valid only at low angles. Here the general definition of contraction flow (the Bagley correction) and a more general method to find...... the pressure drop in a contraction are given....

  3. Transnational Law of Public Contracts

    NARCIS (Netherlands)

    Audit, M.; Schill, S.W.

    2016-01-01

    Public contracts were traditionally conceived as instruments of domestic public law and used within markets confined to the territory of the state party to the contract. Globalization, however, subjects public contracting to an increasing number of processes that take place at a transnational level

  4. The evolution of electricity prices in an uncertain world. Contracting and managing the price risk; L'evolution des prix de l'electricite en univers incertain: Contractualisation et gestion du risque prix

    Energy Technology Data Exchange (ETDEWEB)

    Vassilopoulos, Ph.; Rapin, D. [Universite de Paris Dauphine, Centre de Geopolitique de l' Energie et des Matieres Premieres, 75 - Paris (France)

    2004-09-01

    With the liberalization of the electricity market, the large industrial consumers saw their electric bill changing nature. Before, this price reflected a long term negotiation with the monopoly, now it is established in a free way via wholesale markets. This evolution marks a transfer of the management of price risk from the producer towards the consumer. This change is not in itself a problem if the hedging instruments are adapted. We note a contamination of the price of the derivative products by the spot while at the same time the traditional relation between cash and term is not always valid for electricity because of its non storability. When well even the price of the derivative products would be formed in an autonomous way, it poses a second problem: that of their indexing on price references like Platt's whose result is assimilated more to a survey of large producers than a true confrontation of supply and demand. This article proposes to examine this change of nature and behaviour of electricity prices. After having explained the intrinsically volatile characteristic of spot prices, we will recall that the products in the long term are not always optimal solutions to decrease this price risk. Lastly, we will highlight a solution of skirting at the risks mentioned above: contracting between producers and consumers. (authors)

  5. 77 FR 5020 - Civilian Board of Contract Appeals; Information Collection; Civilian Board of Contract Appeals...

    Science.gov (United States)

    2012-02-01

    ... Paperwork Reduction Act, the Regulatory Secretariat has submitted to the Office of Management and Budget... Rules of Procedure'', under the heading ``Enter Keyword or ID'' and selecting ``Search''. Select the... collected in order to conduct proceedings in contract appeals and petitions, and cost applications. Parties...

  6. A Marketing-Finance Approach towards Industrial Channel Contract Relationships: A Model and Application

    NARCIS (Netherlands)

    Pennings, J.M.E.

    2004-01-01

    Channel contract relations are dynamic. In this paper, it is argued that one of the drivers for this dynamism is a firm's strive for shareholder value. Using channel contract relationships as market-based assets, firms are managing a portfolio of spot and forward contract relationships. By

  7. Maximizing the Performance and Job-Related Behaviors of Contract and Permanent IT Workers

    Science.gov (United States)

    Pai, Tanusree

    2010-01-01

    As the use of contracting for Information Technology (IT) services steadily increases, IT managers are challenged with reconciling the need for flexibility achieved through the use of contract workers, with the need to understand the factors that maximize the performance and behaviors of contract and permanent IT workers. While several research…

  8. 76 FR 58152 - Defense Federal Acquisition Regulation Supplement; Multiyear Contracting (DFARS Case 2009-D026)

    Science.gov (United States)

    2011-09-20

    ... the contract; and (C) A financial risk assessment of not including budgeting for costs of contract... in the budget for the contract; and (3) A financial risk assessment of not including the budgeting..., chapter 1, of DoD 7000.14- R, Financial Management Regulation). ] (g) The head of the agency shall ensure...

  9. The changing psychological contract at work and employee burnout.

    Science.gov (United States)

    Malach Pines, Ayala

    2002-01-01

    Today we stand in a vortex of technological, economic, and cultural changes that altered dramatically the world of labor and with it the psychological contract between employers and employees. While the effects of the changed contract at work are usually addressed from an organizational, social or economic perspective, the current article addresses it from a psychological perspective from which one noteworthy cost of the changed psychological contract is employee burnout. The article describes burnout, differentiates it from stress, and proposes an existential perspective to explain its underlying dynamic, using the results of a cross-cultural study of Israeli and American managers as an example. Recent studies on gender differences in management are used to point in the recommended for preventing employee burnout, despite the new psychological contract, namely--a democratic, egalitarian management style.

  10. 76 FR 54242 - Agency Information Collection Activities: Post-Award Contract Information

    Science.gov (United States)

    2011-08-31

    ..., contract modifications, Small Business Administration Certificate of Competency, Justification and... systems, databases, spreadsheets, project management and other commercial software to facilitate...

  11. [Hospital performance contract: the Senegalese experience].

    Science.gov (United States)

    Gueye, Mame Abdoulaye; Kopp, Jacques Edouard

    2009-01-01

    In 1998 Senegal launched an ambitious hospital reform program which aimed to transform hospitals into government-owned health enterprises, corporations endowed with a legal entity and autonomy for management. Within this agenda, administrative logic was substituted with the concept of performance management, while simultaneously re-affirming the public service mission that had to remain prominently in the name of the State and public authority. The accompanying measures of the reform implemented by the central level did not produce the expected results in terms of management and quality of care; therefore, the authorities concluded that it was necessary to create more incentives and to link at least a portion of the resources allocated by the State to public hospital establishments in the form of grants which required the demonstration of the achievement of some pre-defined objectives according to a common memorandum of agreement with hospital officials. Thus the idea of contracting was born, an idea which ensued from an expression of political will translated through a national policy document on contracting in the health sector in 2004, but it was also translated through an agreement between the Senegalese government and the World Bank specifically within the framework of budgetary support. The preliminary work necessary to develop these performance contracts, namely, the choice of the domains to be contracted, criteria and performance indicators to be retained, was the subject of a significant process of dialogue with the hospital community. Fifteen contracts were signed during the first quarter of 2006, and then evaluated in July 2007. The results of the evaluations were utilised to substantiate the calculations of the performance subsidy that will be allocated in 2008 to the hospitals having achieved the required eligibility level. Despite the limitations and insufficiencies noted in the contracts' content and in the implementation methods, they had an overall

  12. The Lanthanide Contraction Revisited

    Science.gov (United States)

    Seitz, Michael; Oliver, Allen G.; Raymond, Kenneth N.

    2011-01-01

    A complete, isostructural series of complexes with La-Lu (except Pm) with the ligand TREN-1,2-HOIQO has been synthesized and structurally characterized by means of single-crystal X-ray analysis. All complexes are 1D-polymeric species in the solid state, with the lanthanide being in an eight-coordinate, distorted trigonal-dodecahedral environment with a donor set of eight unique oxygen atoms. This series constitutes the first complete set of isostructural complexes from La-Lu (without Pm) with a ligand of denticity greater than two. The geometric arrangement of the chelating moieties slightly deviates across the lanthanide series, as analyzed by a shape parameter metric based on the comparison of the dihedral angles along all edges of the coordination polyhedron. The apparent lanthanide contraction in the individual Ln-O bond lengths deviates considerably from the expected quadratic decrease that was found previously in a number of complexes with ligands of low denticity. The sum of all bond lengths around the trivalent metal cation, however, is more regular, showing an almost ideal quadratic behavior across the entire series. The quadratic nature of the lanthanide contraction is derived theoretically from Slater’s model for the calculation of ionic radii. In addition, the sum of all distances along the edges of the coordination polyhedron show exactly the same quadratic dependence as the Ln-X bond lengths. The universal validity of this coordination sphere contraction, concomitant with the quadratic decrease in Ln-X bond lengths, was confirmed by reexamination of four other, previously published series of lanthanide complexes. Due to the importance of multidentate ligands for the chelation of rare-earth metals, this result provides a significant advance for the prediction and rationalization of the geometric features of the corresponding lanthanide complexes, with great potential impact for all aspects of lanthanide coordination. PMID:17705483

  13. The Lanthanide Contraction Revisited

    Energy Technology Data Exchange (ETDEWEB)

    Seitz, Michael; Oliver, Allen G.; Raymond, Kenneth N.

    2007-04-19

    A complete, isostructural series of lanthanide complexes (except Pm) with the ligand TREN-1,2-HOIQO has been synthesized and structurally characterized by means of single-crystal X-ray analysis. All complexes are 1D-polymeric species in the solid state, with the lanthanide being in an eight-coordinate, distorted trigonal-dodecahedral environment with a donor set of eight unique oxygen atoms. This series constitutes the first complete set of isostructural lanthanide complexes with a ligand of denticity greater than two. The geometric arrangement of the chelating moieties slightly deviates across the lanthanide series, as analyzed by a shape parameter metric based on the comparison of the dihedral angles along all edges of the coordination polyhedron. The apparent lanthanide contraction in the individual Ln-O bond lengths deviates considerably from the expected quadratic decrease that was found previously in a number of complexes with ligands of low denticity. The sum of all bond lengths around the trivalent metal cation, however, is more regular, showing an almost ideal quadratic behavior across the entire series. The quadratic nature of the lanthanide contraction is derived theoretically from Slater's model for the calculation of ionic radii. In addition, the sum of all distances along the edges of the coordination polyhedron show exactly the same quadratic dependency as the Ln-X bond lengths. The universal validity of this coordination sphere contraction, concomitant with the quadratic decrease in Ln-X bond lengths, was confirmed by reexamination of four other, previously published, almost complete series of lanthanide complexes. Due to the importance of multidentate ligands for the chelation of rare-earth metals, this result provides a significant advance for the prediction and rationalization of the geometric features of the corresponding lanthanide complexes, with great potential impact for all aspects of lanthanide coordination.

  14. Contracting singular horseshoe

    Science.gov (United States)

    Morales, C. A.; San Martín, B.

    2017-11-01

    We suggest a notion of hyperbolicity adapted to the geometric Rovella attractor (Robinson 2012 An Introduction to Dynamical Systems—Continuous and Discrete (Pure and Applied Undergraduate Texts vol 19) 2nd edn (Providence, RI: American Mathematical Society)) . More precisely, we call a partially hyperbolic set asymptotically sectional-hyperbolic if its singularities are hyperbolic and if its central subbundle is asymptotically sectional expanding outside the stable manifolds of the singularities. We prove that there are highly chaotic flows with Rovella-like singularities exhibiting this kind of hyperbolicity. We shall call them contracting singular horseshoes.

  15. Negotiating Efficient PPP Contracts

    DEFF Research Database (Denmark)

    Tvarnø, Christina D.

    should consider tendering out PPP projects in the spirit of joint utility because joint utility can increase the concept of more value for money; the cornerstone of the PPP concept. This paper discusses the positive gains from negotiation and compares it with the upcoming possibilities in the EU public....... Joint utility can increase the concept of more value for money; the cornerstone of the PPP concept. The paper draws upon existing legal content regarding collaboration and common goals and game theory to explain the benefits from implementing similar clauses in PPP contracts....

  16. Redesigning the United States Marine Corps contingency contracting process of knowledge sharing and tool usage

    OpenAIRE

    Estrada, Amador Rey

    2001-01-01

    Marine Corps contingency contracting is a critical function of supporting deployed Marine forces. Contingency contracting provides key logistical support for deployed operational forces when normal supply channels cannot. Characterized by a small number of contingency contracting officers, enlisted personnel and high turnover rates, the contingency contracting knowledge base is not being maintained. The purpose of this study is to design a knowledge management system that captures, retains an...

  17. Defining Acquisition and Contracting Terms Associated with Contract Administration

    Science.gov (United States)

    1990-09-01

    Riemer Handbook of Government Contract Administration, the Armed Services Pricing Manual ( ASPM ), and AFIT’s Govern- ment Contract Law course and case book...these duties into general categories, as outlined in the ASPM and Government Contract Cost (16:B-3) (36:25-7,GL-3). NCMA’s Desktop Guide to Basic...processes by listing exactly how an audit is carried out and what it determines. For example, Arnavas, Rishe, and the ASPM conclude that an au- dit is

  18. Contracts for Cross-Organizational Workflow Management

    NARCIS (Netherlands)

    Koetsier, M.J.; Grefen, P.W.P.J.; Vonk, J.

    1999-01-01

    Nowadays, many organizations form dynamic partnerships to deal effectively with market requirements. As companies use automated workflow systems to control their processes, a way of linking workflow processes in different organizations is useful in turning the co-operating companies into a seamless

  19. Contract management techniques for improving construction quality

    Science.gov (United States)

    1997-07-01

    Efforts to improve quality in highway construction embrace many aspects of the construction process. Quality goals include enhanced efficiency and productivity, optimal cost and delivery time, improved performance, and changes in attitude-promoting a...

  20. Assessment of Navy Contract Management Processes

    Science.gov (United States)

    2016-04-30

    References Creswell , J. W. (2003). Research design : Qualitative , quantitative, and mixed methods approaches. Thousand Oaks, CA: Sage. Defense...the phenomena being researched , thus increasing the utility of the information obtained from small samples ( Creswell , 2003; McMillan & Schumacher...Monterey, CA 93943. ^Åèìáëáíáçå=oÉëÉ~êÅÜ=mêçÖê~ã= dê~Çì~íÉ=pÅÜççä=çÑ=_ìëáåÉëë=C=mìÄäáÅ=mçäáÅó= k~î~ä=mçëíÖê~Çì~íÉ=pÅÜççä= The research presented in this

  1. 48 CFR 716.406 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 716.406 Section 716.406 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost Reimbursement Contracts 716.406 Contract clauses. The...

  2. 48 CFR 1416.405 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1416.405 Section 1416.405 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 1416.405 Contract clauses. The BPC, without the power...

  3. 48 CFR 732.111 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 732.111... CONTRACTING REQUIREMENTS CONTRACT FINANCING General 732.111 Contract clauses. (a) (b) USAID may obtain short... indefinite quantity contracts that are a combination of contract types. Rather than using the fixed-price...

  4. 48 CFR 916.307 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 916.307 Section 916.307 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 916.307 Contract clauses. (g) Insert the...

  5. 41 CFR 101-26.509-2 - Requisitioning tabulating machine cards not available from Federal Supply Schedule contracts.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Requisitioning tabulating... Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement...

  6. 41 CFR 101-26.508-2 - Requisitioning data processing tape not available from Federal Supply Schedule contracts.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Requisitioning data... Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.5-GSA Procurement...

  7. Some ancestors of contraction analysis

    DEFF Research Database (Denmark)

    Jouffroy, Jerome

    2005-01-01

    Contraction analysis is a recent tool for analyzing the convergence behavior of nonlinear systems in state-space form (see Lohmiller and Slotine [16] for the main reference). However, it seems that earlier results derived by mathematicians in the 1950s closely match some of the results...... of contraction analysis. In this paper, we review and place into perspective some references of this era, and relate them with contraction....

  8. Methodological remarks on contraction theory

    DEFF Research Database (Denmark)

    Jouffroy, Jerome; Slotine, Jean-Jacques E.

    classical examples traditionally addressed using Lyapunov theory. Even in these cases, contraction tools can often yield significantly simplified analysis. The examples include adaptive control, robotics, and a proof of convergence of the deterministic Extended Kalman Filter.......Because contraction analysis stems from a differential and incremental framework, the nature and methodology of contraction-based proofs are significantly different from those of their Lyapunov-based counterparts. This paper specifically studies this issue, and illustrates it by revisiting some...

  9. Performance contracts for police forces

    OpenAIRE

    Ben Vollaard

    2003-01-01

    In 2003, the government will enter into performance contracts with each of the 25 regional police forces. The performance contracts establish a direct link between meeting a number of quantitative performance targets and financial incentives. A major improvement in police performance is necessary to meet the objective of 20 to 25 percent less criminal and disorderly behavior by 2006. A closer look at the performance contracts learns that they may not be the most appropriate policy instrument ...

  10. Expansionary fiscal contractions

    DEFF Research Database (Denmark)

    Bergman, Ulf Michael; Hutchison, Michael

    2010-01-01

    The Expansionary Fiscal Contraction (EFC) hypothesis predicts that a major fiscal consolidation leads to an economic expansion under certain circumstances. We test this hypothesis, and the implied non-linear responses of the economy to large and small changes in fiscal policy, using data from...... the 1983 Danish fiscal reform. We use a structural VAR/event study methodology following Blanchard and Perotti (2002) that explicitly allows us to distinguish between normally marginal changes in fiscal policy and comprehensive fiscal reforms. We find that 'marginal changes' in fiscal policy (expenditure...... and tax changes) have the expected Keynesian effects on output and consumption. However, we find no evidence that the large fiscal consolidation in Denmark slowed the economy after controlling for a host of exogenous shocks and business cycle effects. Rather, we find some support for the hypothesis...

  11. The Danish Contracting System

    DEFF Research Database (Denmark)

    Bonke, Sten; Levring, Peter

    development trends are indicated. A third section describes the contemporary external, regulative framework of construction projects. In the two final sections the construction process is decomposed with regard to 1)phases and activities and 2)procurement forms, actors and functions.......The paper is mainly concerned with the institutional framework of the Danish construction industry, describing structures, rules and actors' roles within a perspective of nationally defined procedural guidelines on construction projects. These aspects are treated under the concept of a "contracting...... system". After a short introduction to the structure and activities of the industry the post-war development is reviewed, in particular emphasising the importance of the early industrialisation process which in an international perspective represents quite unique features. Furthermore the most recent...

  12. Contracting of services companies management and the outsourcing paradox: a study of success case under the prism of the HSE management systems; Gestao de empresas prestadoras de servico e o paradoxo da terceirizacao: um estudo de caso de sucesso sob o prisma do sistema de gestao de SMS

    Energy Technology Data Exchange (ETDEWEB)

    Robalinho da Silva, Agostinho da Mota [PETROBRAS, Salvador, BA (Brazil). Unidade de Negocio da Bacia de Campos. Gerencia de Seguranca, Meio Ambiente e Saude]. E-mail: amrs@petrobras.com.br; Lima, Gilson Brito Alves [Universidade Federal Fluminense, Niteroi, RJ (Brazil). Curso de Pos-graduacao em Engenharia de Seguranca do Trabalho]. E-mail: Gilson@civil.uff.br

    2003-07-01

    Outsourcing, sometimes called 'terceirizacao', evoques polemic. In one hand by arguments that becomes precarious the work conditions, seeking only to reduce costs, increasing as consequence the number of accidents. In other hand for arguments that companies can not be excellent in all competence areas, needing to associate more and more to strategic partners. Ideological arguments defends the non-outsourcing of work force as form of socializing the rights and strengthening the workers' representation in defense of its interests. On the other hand there are mega enterprises mobilizing a varied and intense range of professional competencies that would hinder personnel's administration in a non-outsourcing context. The outsourcing, here denominated Contracting of Services that best express the practice in study, it is the reality of Exploration and Production of Petroleum Industry. This work wants to demonstrate through Study of Case of Campos' Basin, that is possible to reconcile the industrial growth with elevated number of contracted workers, without committing SMS indicators. We do not enter in the merit of the outsourcing or non-outsourcing for understanding that is theme for specific work. Also wants to stimulate HSE Management Systems and regulatory instruments for selection and control like requirements to ability and qualify companies in the sector. (author)

  13. Forthcoming indefinite contract review procedure

    CERN Multimedia

    Human Resources Department

    2011-01-01

    The vacancy notices for posts opened with a view to the award of an indefinite contract will be published in early April 2011. In the meantime, the list of posts to be opened this spring is available at the following address: Indefinite contract posts - spring 2011 A second exercise will take place in autumn 2011 and, as of 2012, the indefinite contract award procedure will only be held once a year, in autumn. For more information please consult: https://hr-recruit.web.cern.ch/hr-recruit/staff/IndefiniteContracts.asp  

  14. Simplifying Contract-Violating Traces

    Directory of Open Access Journals (Sweden)

    Christian Colombo

    2012-09-01

    Full Text Available Contract conformance is hard to determine statically, prior to the deployment of large pieces of software. A scalable alternative is to monitor for contract violations post-deployment: once a violation is detected, the trace characterising the offending execution is analysed to pinpoint the source of the offence. A major drawback with this technique is that, often, contract violations take time to surface, resulting in long traces that are hard to analyse. This paper proposes a methodology together with an accompanying tool for simplifying traces and assisting contract-violation debugging.

  15. Uterine Contraction Modeling and Simulation

    Science.gov (United States)

    Liu, Miao; Belfore, Lee A.; Shen, Yuzhong; Scerbo, Mark W.

    2010-01-01

    Building a training system for medical personnel to properly interpret fetal heart rate tracing requires developing accurate models that can relate various signal patterns to certain pathologies. In addition to modeling the fetal heart rate signal itself, the change of uterine pressure that bears strong relation to fetal heart rate and provides indications of maternal and fetal status should also be considered. In this work, we have developed a group of parametric models to simulate uterine contractions during labor and delivery. Through analysis of real patient records, we propose to model uterine contraction signals by three major components: regular contractions, impulsive noise caused by fetal movements, and low amplitude noise invoked by maternal breathing and measuring apparatus. The regular contractions are modeled by an asymmetric generalized Gaussian function and least squares estimation is used to compute the parameter values of the asymmetric generalized Gaussian function based on uterine contractions of real patients. Regular contractions are detected based on thresholding and derivative analysis of uterine contractions. Impulsive noise caused by fetal movements and low amplitude noise by maternal breathing and measuring apparatus are modeled by rational polynomial functions and Perlin noise, respectively. Experiment results show the synthesized uterine contractions can mimic the real uterine contractions realistically, demonstrating the effectiveness of the proposed algorithm.

  16. FACILITIES MANAGEMENT AT CERN

    CERN Multimedia

    2002-01-01

    Recently we have been confronted with difficulties concerning services which are part of a new contract for facilities management. Please see below for some information about this contract. Following competitive tendering and the Finance Committee decision, the contract was awarded to the Swiss firm 'Facilities Management Network (FMN)'. The owners of FMN are two companies 'M+W Zander' and 'Avireal', both very experienced in this field of facilities management. The contract entered into force on 1st July 2002. CERN has grouped together around 20 different activities into this one contract, which was previously covered by separate contracts. The new contract includes the management and execution of many activities, in particular: Guards and access control; cleaning; operation and maintenance of heating plants, cooling and ventilation equipment for buildings not related to the tunnel or the LHC; plumbing; sanitation; lifts; green areas and roads; waste disposal; and includes a centralised helpdesk for these act...

  17. Contract 98 Self-Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This report documents the results of LBL`s Self-Assessment required by Appendix F to Contract DE ACOO3765F00098. This self assessment covers the performance measures set forth in Appendix F except those requiring an external audit. The performance measures for LBL are in the areas of ES&H Finance, Human Services and Procurement and Property. LBL is a multi-program laboratory operated by the University of California (UC) for DOE. The mission of LBL includes performing research in energy, general, and life sciences. LBL facilities include the main site on 130 acres located in the cities of Berkeley and Oakland; laboratories and offices located in buildings on the UC Berkeley Campus; and three leased buildings in the cities of Berkeley and Emeryville. 1. Involvement of Line Management in the assessment process to provide awareness and ownership. 2. Using existing assessments, audits and appraisals in lieu of a new assessment wherever possible. 3. Conduct of the assessments by individuals with functional responsibility and knowledge of the areas being assessed. 4. Interaction with individuals performing assessments at other Laboratories to enhance our learning process. As anticipated, a number of findings will require corrective action. General corrective actions are identified for key findings in this report. In early May 1993, this Laboratory will begin the development of detailed formal corrective action plans which will be entered into a laboratory automated corrective action tracking system.

  18. 77 FR 9620 - Public Availability of FY 2011 Service Contract Inventories

    Science.gov (United States)

    2012-02-17

    ... Public Availability of FY 2011 Service Contract Inventories AGENCY: Office of Procurement and Property Management, Departmental Management, Department of Agriculture. ACTION: Notice of public availability of FY... to advise the public of the availability of the FY 2011 Service Contract inventory. This inventory...

  19. Physician Personal Services Contract Enforceability: The Influence of the Thirteenth Amendment.

    Science.gov (United States)

    Fasko, Steven A; Kerr, Bernard J; Alvarez, M Raymond; Westrum, Andrew

    We explore the influence of the Thirteenth Amendment to the US Constitution on the enforceability of personal services contracts for physicians. This influence extends from the ambiguous definition to the legal interpretation of personal services contracts. The courts have struggled with determining contracts to be a personal service and whether to grant injunctions for continued performance. The award or denial of damages due to a breach of contract is vested in these enforceability complications. Because of the Thirteenth Amendment's influence, courts and contracting parties will continue to struggle with physician personal services contract enforceability; although other points of view may exist. Possible solutions are offered for health care contract managers dealing with challenges attributable to physician personal services contracts.

  20. Psychological Contract Development: An Integration of Existing Knowledge to Form a Temporal Model

    Directory of Open Access Journals (Sweden)

    Kelly Windle

    2014-07-01

    Full Text Available The psychological contract has received substantial theoretical attention over the past two decades as a popular framework within which to examine contemporary employment relationships. Previous research mostly examines breach and violation of the psychological contract and its impact on employee organization outcomes. Few studies have employed longitudinal, prospective research designs to investigate the psychological contract and as a result, psychological contract content and formation are incompletely understood. It is argued that employment relationships may be better proactively managed with greater understanding of formation and changes in the psychological contract. We examine existing psychological contract literature to identify five key factors proposed to contribute to the formation of psychological contracts. We extend the current research by integrating these factors for the first time into a temporal model of psychological contract development.

  1. Outsourcing in public health: a case study of contract failure and its aftermath.

    Science.gov (United States)

    Young, Suzanne

    2008-01-01

    Outsourcing has been used in Australia as part of the new public management agenda with the aim of increasing efficiency and decreasing costs. In the public health sector its use has been problematic and the purpose of this paper is to explore the largest Australian health contract at the time; investigating the reasons, the processes and the outcomes. Specifically, it investigates why the contract failed and the lessons to be learned from its subsequent awarding. The paper uses a case study approach to investigate in depth the outsourcing decision. Alongside savings in costs, changes to work practices and reduction in union power, it was found that the outsourcing contract produced problems with service quality, sharing of culture, relationships between contract and internal staff, and in managing the contract and staff; and reductions in trust and morale of both internal and contract staff. Inadequate contract specifications and subsequent under pricing was the cause of contract termination, poor quality, and difficulties in contract management. The paper provides important lessons for decision makers when outsourcing in public health. The paper investigates the largest outsourcing contract in public health in Australia in the 1990s. It investigates the failure of the initial contract and its subsequent awarding to another vendor. The case study approach provides an in-depth analysis of this decision.

  2. Performance-based contracting in home-care work in The Netherlands : Professionalism under pressure?

    NARCIS (Netherlands)

    Oomkens, Rosanne; Hoogenboom, Marcel; Knijn, Trudie

    2016-01-01

    Our aim was to improve the understanding of the relationships between performance-based contracting, management supportiveness and professionalism in home care. Using path analysis, this article explores the relationships between home-care workers' perceptions of management support, implementation

  3. On CNC commuting contractive tuples

    Indian Academy of Sciences (India)

    The characteristic function has been an important tool for studying completely non-unitary contractions on Hilbert spaces. In this note, we consider completely non-coisometric contractive tuples of commuting operators on a Hilbert space H . We show that the characteristic function, which is now an operator-valued analytic ...

  4. CONTRACT ADMINISTRATIVE TRACKING SYSTEM (CATS)

    Science.gov (United States)

    The Contract Administrative Tracking System (CATS) was developed in response to an ORD NHEERL, Mid-Continent Ecology Division (MED)-recognized need for an automated tracking and retrieval system for Cost Reimbursable Level of Effort (CR/LOE) Contracts. CATS is an Oracle-based app...

  5. Policing Mechanisms in Agricultural Contracts

    Science.gov (United States)

    Wolf, Steven; Hueth, Brent; Ligon, Ethan

    2001-01-01

    In this paper we focus on mechanisms of coordination in agricultural contracts. Our approach is intended to advance understanding of social relations of production and distribution of power in agrofood systems. Through an analysis of contracts between farmers and intermediaries (e.g., processors, shippers, consignment agents) for California fruits…

  6. Contract Training in Community Colleges.

    Science.gov (United States)

    Suchorski, Joan M.

    One of the most significant developments in higher education over the past decade has been the increased linkages between colleges and other organizations and institutions. A prominent and fast-growing form of linkage is contract training. Contract training refers to an arrangement in which a business, a government agency, or a community…

  7. Choreography Synthesis as Contract Agreement

    Directory of Open Access Journals (Sweden)

    Julien Lange

    2013-10-01

    Full Text Available We propose a formal model for distributed systems, where each participant advertises its requirements and obligations as behavioural contracts, and where multiparty sessions are started when a set of contracts allows to synthesise a choreography. Our framework is based on the CO2 calculus for contract-oriented computing, and borrows concepts and results from the session type literature. It supports sessions where the number of participants is not determined beforehand, and keeps CO2's ability to rule out participants that are culpable if contracts are not fulfilled at runtime. We show that we have progress and session fidelity in CO2, as a result of the honesty of participants — i.e., their ability to always adhere to their contracts.

  8. Mechanobiology of lymphatic contractions.

    Science.gov (United States)

    Munn, Lance L

    2015-02-01

    The lymphatic system is responsible for controlling tissue fluid pressure by facilitating flow of lymph (i.e. the plasma and cells that enter the lymphatic system). Because lymph contains cells of the immune system, its transport is not only important for fluid homeostasis, but also immune function. Lymph drainage can occur via passive flow or active pumping, and much research has identified the key biochemical and mechanical factors that affect output. Although many studies and reviews have addressed how tissue properties and fluid mechanics (i.e. pressure gradients) affect lymph transport [1-3] there is less known about lymphatic mechanobiology. As opposed to passive mechanical properties, mechanobiology describes the active coupling of mechanical signals and biochemical pathways. Lymphatic vasomotion is the result of a fascinating system affected by mechanical forces exerted by the flowing lymph, including pressure-induced vessel stretch and flow-induced shear stresses. These forces can trigger or modulate biochemical pathways important for controlling the lymphatic contractions. Here, I review the current understanding of lymphatic vessel function, focusing on vessel mechanobiology, and summarize the prospects for a comprehensive understanding that integrates the mechanical and biomechanical control mechanisms in the lymphatic system. Copyright © 2015 Elsevier Ltd. All rights reserved.

  9. INFINITY construction contract signed

    Science.gov (United States)

    2010-01-01

    Key state and community leaders celebrated April 6 with the signing of a construction contract for the state-of-the-art INFINITY Science Center planned near John C. Stennis Space Center in south Mississippi. Gulfport Mayor George Schloegel (l to r), chair of non-profit INFINITY Science Center Inc., was joined for the signing ceremony at the Hancock Bank in Gulfport by Virginia Wagner, sister of late Hancock Bank President Leo Seal Jr.; and Roy Anderson III, president and CEO of Roy Anderson Corp. Seal was the first chair of INFINITY Science Center Inc., which has led in development of the project. Roy Anderson Corp. plans to begin construction on the 72,000-square-foot, $28 million science and education center in May. The Mississippi Department of Transportation (MDOT) also is set to begin construction of a $2 million access road to the new center. The April 6 ceremony was attended by numerous officials, including former Stennis Space Center Directors Jerry Hlass and Roy Estess; Mississippi Senate President Pro Tempore Billy Hewes, R-Gulfport; Mississippi Rep. Diane Peranich, D-Pass Christian; and MDOT Southern District Commissioner Wayne Brown.

  10. [Ulysses contract in psychiatry].

    Science.gov (United States)

    Daverio, Andrea; Piazzi, Gioia; Saya, Anna

    2017-01-01

    Over the last twenty years we have witnessed a growing focus on the rights of the ill people. The debate on informed consent and a new redefinition of the therapeutic relationship is constantly evolving. With this article, we propose a critical literature review of the so-called "Ulysses contract" or "psychiatric advance directives". It refers to the will that a subject expresses in writing, or orally, about the treatments he or she wishes or does not wish to be subject to if the time comes when it may be impossible to express his/her consent. This can especially occur in those with psychiatric disorders with serious clinical involvement and remitting-relapse (typically bipolar disorder, but also chronic delusional disorders and schizophrenia). In this context, the question is whether during intercritical periods the patient may or may not leave instructions to their care-givers. This aspect opens up to a series of interdisciplinary problems. In this article, we want to show the complexity of this debate from a clinical, ethical, legal and psychodynamic point of view, emphasizing the strengths and the major criticisms of the psychiatric advance directives for each area.

  11. 48 CFR 1516.307 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ...-reimbursement contracts when an anticipatory cost letter has been issued on the project. (b) The Contracting... such a provision would be detrimental to ensuring proper contract performance. (c) The Contracting... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract clauses. 1516.307...

  12. Ontologies for commitment-based smart contracts

    NARCIS (Netherlands)

    de Kruijff, Joost; Weigand, Hans; Panetto, H; Debruyne, C.; Gaaloul, W.; Papazoglou, M.; Paschke, A.; Ardagna, C.A.; Meersman, R.

    2017-01-01

    Smart contracts gain rapid exposure since the inception of blockchain technology. Yet there is no unified ontology for smart contracts. Being categorized as coded contracts or substitutes of conventional legal contracts, there is a need to reduce the conceptual ambiguity of smart contracts. We

  13. 48 CFR 811.503 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 811.503... ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Liquidated Damages 811.503 Contract clause. When the contracting... contracting officer must include the clause in 852.211-74, Liquidated damages, in the contract. ...

  14. 48 CFR 822.305 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 822.305... PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Contract Work Hours and Safety Standards Act 822.305 Contract clause. The contracting officer shall insert the clause at 852.222-70, Contract Work...

  15. 48 CFR 837.403 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 837.403... OF CONTRACTING SERVICE CONTRACTING Nonpersonal Health Care Services 837.403 Contract clause. The contracting officer shall insert the clause at 852.237-7, Indemnification and medical liability insurance, in...

  16. Contracting Data Analysis: Assessment of Government-Wide Trends

    Science.gov (United States)

    2017-03-01

    top management challenges. In FY 2015, roughly 74 percent of HHS’s contract obligations were for services, and its top five services accounted for...increased management attention by over $820 million. HHS’s top products, which were largely drug related, accounted for 91 percent of total obligations...Siggerud, Managing Director, siggerudk@gao.gov, (202) 512-4400, U.S. Government Accountability Office, 441 G Street NW, Room 7125, Washington, DC

  17. Food and drink serving contract

    Directory of Open Access Journals (Sweden)

    Veselinović Janko

    2012-01-01

    Full Text Available Food and drink catering service is almost as old as the civilization itself. Even though this vocation is a part of the catering activity, Serbian law does not foresee this contract section as personalized. Key legal sources for this kind of contract are business customs. Food and drink serving contract is a mixed-type contract and its legal nature is very interesting due to its complexity. Specific for this contract is the fact that it is not an ordinary service, but also an activity which requires a degree of culinary skills, knowledge of customs of other nations, as well as other skills. The very category of a good professional in business economy / hospitality industry is very dynamic, as it needs to be evaluated according to all given circumstances, which may be rather unpredictable. By considering the legal nature, but also the rights and obligations of the contracting parties, we tried to point to the questions that require a special attention. Legal sources that indirectly refer to food and drink serving contracts were taken into account. Apart from the Law on Obligatory Relations, we also considered here the Law on Tourism also pointing to the comparative law and jurisprudence.

  18. Guidelines for cost control and analysis of cost-type research and development contracts

    Science.gov (United States)

    Sibbers, C. W.

    1981-01-01

    The cost information which should be obtained from a contractor(s) on a major, cost type research and development contract(s), and the analyses and effective use of these data are discussed. Specific type(s) of information which should be required, methods for analyzing such information, and methods for effectively using the results of such analyses to enhance NASA contract and project management are included. The material presented is based primarily on the principal methods which have been effectively used in the management of major cost type research and development contracts.

  19. Bottomland Hardwood Planting: Example Contract Specifications

    National Research Council Canada - National Science Library

    Humprey, Monica

    2002-01-01

    This technical note provides an example of contract specifications that can be used as a template by USACE biologists, engineers, or contracting officers for contracting the planting of bottomland hardwood (BLH) seedlings...

  20. 78 FR 11699 - International Mail Contract

    Science.gov (United States)

    2013-02-19

    ... International Mail Contract AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is... entered into an additional International Business Reply Service (IBRS) Competitive Contract 3 negotiated... Equivalent International Business Reply Service Competitive Contract 3 Negotiated Service Agreement, February...

  1. 78 FR 11237 - International Mail Contract

    Science.gov (United States)

    2013-02-15

    ... International Mail Contract AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a recent Postal Service filing concerning an additional Global Reseller Expedited Package Contract... entered into an additional Global Reseller Expedited Package Contracts 1 negotiated service agreement...

  2. 77 FR 54937 - International Mail Postal Contract

    Science.gov (United States)

    2012-09-06

    ... COMMISSION International Mail Postal Contract AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY... (2) asks the Commission to include the new contract within the International Business Reply Service... Functionally Equivalent International Business Reply Service Competitive Contract 3 Negotiated Settlement...

  3. Utility Energy Services Contracts: Enabling Documents

    Energy Technology Data Exchange (ETDEWEB)

    None

    2009-05-01

    Utility Energy Services Contracts: Enabling Documents provides materials that clarify the authority for Federal agencies to enter into utility energy services contracts (UESCs), as well as sample documents and resources to ease utility partnership contracting.

  4. 40 CFR 35.970 - Contract enforcement.

    Science.gov (United States)

    2010-07-01

    ... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.970 Contract... technical or legal involvement in any contract dispute will not make EPA a party to any contract entered...

  5. Micro and small firms contracted the works of third sector contracting and public

    Directory of Open Access Journals (Sweden)

    Daniela Juliano Silva

    2015-06-01

    Full Text Available In a scenario of successive changes, we are faced today with a "new" State of design (First Sector subsidiary and developer, embracing new contracting models, involving private non-profit institutions (Third Sector ahead of social services relevance (health, education, technology, among others. To comply with the obligations entered into with the public entity (end-obligations, this Third Sector performs hires (to perform their half-bonds with the second sector (market, where they operate Micro and Small Businesses. This study aims a reflective look at these contracts, usually the result of simplified bidding process in order to verify their specificities and whether they take place in compliance with the prerogatives and differential treatment meted especially those business companies (art. 170, X, SC / 1988. In this endeavor, it was decided, besides a literature review by an investigative approach from the point of view of three different social organizations that have management contracts in health care with public entities and therefore have signed contracts with ME and EPP for the fulfillment of their obligations to the government.      

  6. 24 CFR 983.206 - HAP contract amendments (to add or substitute contract units).

    Science.gov (United States)

    2010-04-01

    ... substitute contract units). 983.206 Section 983.206 Housing and Urban Development Regulations Relating to... Contract § 983.206 HAP contract amendments (to add or substitute contract units). (a) Amendment to substitute contract units. At the discretion of the PHA and subject to all PBV requirements, the HAP contract...

  7. 30 CFR 206.103 - How do I value oil that is not sold under an arm's-length contract?

    Science.gov (United States)

    2010-07-01

    ... arm's-length contract? 206.103 Section 206.103 Mineral Resources MINERALS MANAGEMENT SERVICE... oil that is not sold under an arm's-length contract? This section explains how to value oil that you... average of the gross proceeds accruing to the seller under your or your affiliates' arm's-length contracts...

  8. 13 CFR 125.15 - What requirements must an SDVO SBC meet to submit an offer on a contract?

    Science.gov (United States)

    2010-01-01

    ... venturer as the project manager responsible for performance of the SDVO contract; (iii) Stating that not... other concern with respect to performance of the SDVO contract. The combined annual receipts or...); (iv) Specifying the responsibilities of the parties with regard to contract performance, source of...

  9. Smooth Sailing with Contract Services.

    Science.gov (United States)

    Fickes, Michael

    2001-01-01

    Discusses how to make the contract services relationship work smoothly for educational facilities. Covers topics of food, child care, and transportation services, along with a brief explanation of the benefits of outsourcing on-campus amenities. (GR)

  10. Next Indefinite Contract review exercise

    CERN Multimedia

    2013-01-01

    Dear Colleagues, We are pleased to inform you that the 2013 LD2IC exercise (selection process for the conversion of limited-duration contracts to indefinite contracts) was officially launched last week.  The vacancy notices for posts opened with a view to the award of indefinite contracts will be published on 9 August 2013 for a period of four weeks (until 8 September 2013). The CERN Contract Review Boards (candidate interviews) will be held between the end of September and mid-November. The LD to IC procedure, Frequently Asked Questions and a calendar for the exercise are now available in the Admin e-guide. In addition, general information sessions on the procedure will be organised for candidates on the following dates: Information on the location of these sessions will be provided in due course on the CERN announcements page. HR Department

  11. Framework for Structuring Procurement Contracts

    Directory of Open Access Journals (Sweden)

    Lena Borg

    2014-12-01

    Full Text Available The aim of this paper is to propose a new framework for structuring contract types and payment methods. Concerning procurement contracts, the first important new feature of this framework is a stepwise structure with three main steps in the contract design: (1 what will be procured—should the contract only include construction, or should it include both construction and operation/maintenance (2 who will do the detailed design of the premise and (3 how many contractors will the client use? The second important new feature of this framework is that both step 2 and step 3 include a continuum of alternatives. Concerning payment methods, the new framework is primarily based on how the specific risks of the project are shared. These frameworks can be useful for policy formulation in that they can help to avoid some problematic ways of formulating policies.

  12. Multifamily Assistance Section 8 Contracts

    Data.gov (United States)

    Department of Housing and Urban Development — he information regarding the Multifamily Assistance and Section 8 contracts, and properties is being furnished for the convenience of interested parties. The...

  13. Non-renewal of contracts

    CERN Multimedia

    Association du personnel

    2007-01-01

    A new illegal practice is appearing in certain sectors of the Organization: the non-renewal of renewable three-year limited-duration (LD) contracts, despite a more than satisfactory performance and an obvious commitment to the Organization.

  14. Determinants of Service Contract Outcomes

    Science.gov (United States)

    2011-04-30

    limited to applications of service quality in business-to-consumer (B2C) contexts. The five dimensions of service quality do not always fit B2B ...Buyers of customer-defined B2B services often state service expectations in requirement documents that are incorporated into contracts. Within public...centrality of relational exchange, any study of B2B exchange should include the effects of relational norms. When contracting for services, proper

  15. 7 CFR 1780.61 - Construction contracts.

    Science.gov (United States)

    2010-01-01

    ... AGRICULTURE (CONTINUED) WATER AND WASTE LOANS AND GRANTS Planning, Designing, Bidding, Contracting... will be obtained prior to their use. (b) Contract review and concurrence. The owner's attorney will...

  16. Covenant Violations and Dynamic Loan Contracting

    DEFF Research Database (Denmark)

    Freudenberg, Felix; Imbierowicz, Björn; Saunders, Anthony

    2017-01-01

    This paper examines the dynamic allocation of control rights in private debt contracts of firms. We show that a covenant violation in the prior loan contract implies a stigma for borrowers which results in stricter loan contract terms in subsequent new loan contracts. Our analyses reject potentia......This paper examines the dynamic allocation of control rights in private debt contracts of firms. We show that a covenant violation in the prior loan contract implies a stigma for borrowers which results in stricter loan contract terms in subsequent new loan contracts. Our analyses reject...

  17. 48 CFR 39.103 - Modular contracting.

    Science.gov (United States)

    2010-10-01

    ... section implements Section 5202, Incremental Acquisition of Information Technology, of the Clinger-Cohen... circumstances (e.g., indefinite delivery, indefinite quantity contracts, single contract with options...

  18. Contracting Out and Organizational Learning in the Public Sector

    DEFF Research Database (Denmark)

    Lindholst, Christian; Hansen, Morten Balle; Nielsen, Jeppe Agger

    . Emphasis on a ‘hard’ contract management style tends to diminish organizational learning while emphasis on collaborative governance, greater formalization of contractual relations, larger contract management capacities, and emphasis on learning intends all enhances organizational learning. We discuss...... as the key driver for improvement. However, it is a long-standing and well-proven hypothesis in the organizational literature that organizations can also improve their functioning and performance by learning from engagement with other organizations in their environments. Yet, little is known about whether...... and how engagements between private and public organizations may lead to improvements in the public sector as a result of organizational learning. In this study, we propose and test the main hypothesis that engagements with private organizations through the use of contracting out facilitates...

  19. Contract administration involving the remedial investigation and feasibility study at the Feed Materials Production Center

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-28

    Advanced Sciences, Incorporated (ASI), has been performing a Remedial Investigation and Feasibility Study (RI/FS) at the Feed Materials Production Center (Fernald Facility) at Fernald, Ohio, under an 8 (a) contract with the US Small Business Administration (SBA). The Fernald Facility is a Government-owned facility operated by Westinghouse Materials Company of Ohio (WMCO) under a management and operating contract. The objective of this audit was to evaluate the award and administration of the ASI contract.

  20. Contracting Processes, Internal Controls, and Procurement Fraud: A Knowledge Assessment (Briefing Charts)

    Science.gov (United States)

    2015-05-01

    Contracting Processes, Internal Controls, and Procurement Fraud : A Knowledge Assessment Juanita M. Rendon Rene G. Rendon Report...TYPE 3. DATES COVERED 00-00-2015 to 00-00-2015 4. TITLE AND SUBTITLE Contracting Processes, Internal Controls, and Procurement Fraud : A...DoD, 2009, 2015) • DoD contract management deficiencies result in higher level of vulnerability for procurement fraud 4 Background

  1. Contracting-out and governance mechanisms in the public employment service

    OpenAIRE

    Bruttel, Oliver

    2005-01-01

    "The contracting-out of job brokerage and case management services is a major international trend in the reform of the Public Employment Service. Instead of a public agency, private providers are contracted to deliver these services for the jobseekers. Australia and the Netherlands have contracted-out (almost) all of this formerly core public service. The U.K. has introduced so-called Employment Zones, in which private providers are responsible for long-term unemployed and thus replace the pu...

  2. 48 CFR 970.2301-2 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ...) Section 3(f) of Executive Order 13423 requires contractors to comply with the provisions of the Order to.... Insert the clause at 970.5223-6, Executive Order 13423, Strengthening Federal Environmental, Energy, and... Environmentally Preferable Purchasing Practices, or its Alternate I in contracts for the management and operation...

  3. Contracting for Child & Family Services: A Mission-Sensitive Guide.

    Science.gov (United States)

    Kahn, Alfred J.; Kamerman, Sheila B.

    This report presents a guide to successful contracting of child and family social services during a new era in child welfare. The six chapters focus on: (1) "Privatization, Purchase of Service, Managed Care, and the Child Welfare Reform Agenda" (the continuing crisis, reforming the local child welfare delivery system, and the federal…

  4. Defining and Measuring the Success of Service Contracts

    Science.gov (United States)

    2012-06-01

    how to meet the objectives of the service contract. Pertinent activities include conducting advertising to identify new sources and compiling a list...and Air Force. Acquisition Research Journal, 12(1), 3–32. Sekhar, G. V. (2010). Business policy and strategic management. Uphaar Cinema Market

  5. Contracting Out and Organizational Learning in the Public Sector

    DEFF Research Database (Denmark)

    Lindholst, Andrej Christian; Hansen, Morten Balle; Nielsen, Jeppe Agger

    - and road maintenance) in local governments in Denmark, England, Norway and Sweden. We find that contracting out tends to enhance organizational learning in public organizations. Our findings also suggest variation in the impact depending on different ways of organizing and managing contractual relations...

  6. Building Psychological Contracts in Security-Risk Environments

    DEFF Research Database (Denmark)

    Ramirez, Jacobo; Madero, Sergio; Vélez-Zapata, Claudia

    2015-01-01

    and the impacts of narcoterrorism on firms were conducted with human resources (HR) personnel, line managers and subordinates at eight national and multinational corporations (MNCs) with subsidiaries in Colombia and Mexico. Our findings generally support the existence of a relational psychological contract in our...

  7. Contract Mining versus Owner Mining – The Way Forward | Suglo ...

    African Journals Online (AJOL)

    Mining involves many operations such as rock breakage, materials handling, equipment maintenance, mine design, scheduling and budgeting. At one stage or the other mine managements often have to decide whether to undertake a major mining operation using their own equipment and personnel or to contract the ...

  8. Teachers' Psychological Contract Perceptions and Person-Environment Fit Levels

    Science.gov (United States)

    Demirkasimoglu, Nihan

    2014-01-01

    Problem Statement: Modern management approaches attach great importance to both the informal and the economic aspects of the organizations. Identifying teachers' psychological contract types and fit levels of a work environment in terms of variables such as seniority, educational degree, and school type will lead to discovery of the motivational…

  9. Next Indefinite Contract review exercise

    CERN Multimedia

    HR Department

    2015-01-01

    Dear Colleagues, We are pleased to inform you that the 2015 LD2IC exercise (selection process for the conversion of limited-duration contracts into indefinite contracts) has been officially launched. The vacancy notices for posts opened with a view to the award of indefinite contracts will be published on 3 August 2015 for a period of four weeks (until 31 August 2015). The CERN Contract Review Boards (candidate interviews) will be held between the end of September and mid-November. The LD to IC procedure, Frequently Asked Questions (FAQ) and a calendar for the exercise are now available in the Admin e-guide. In addition, general information sessions on the procedure will be organised for candidates on the following dates: We would like to remind you that all staff members holding a limited-duration contract who have successfully completed their probation period at the time of application and who meet the eligibility criteria in the vacancy notices (VNs) are eligible to apply for posts for the award of a...

  10. Next Indefinite Contract review exercise

    CERN Multimedia

    2015-01-01

    Dear Colleagues, We are pleased to inform you that the 2015 LD2IC exercise (selection process for the conversion of limited-duration contracts into indefinite contracts) has been officially launched. The vacancy notices for posts opened with a view to the award of indefinite contracts will be published on 3 August 2015 for a period of four weeks (until 31 August 2015). The CERN Contract Review Boards (candidate interviews) will be held between the end of September and mid-November. The LD to IC procedure, Frequently Asked Questions (FAQ) and a calendar for the exercise are now available in the Admin e-guide. In addition, general information sessions on the procedure will be organised for candidates on the following dates: We would like to remind you that all staff members holding a limited-duration contract who have successfully completed their probation period at the time of application and who meet the eligibility criteria in the vacancy notices (VNs) are eligible to apply for posts for the awa...

  11. University contracts summary book

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-08-01

    The principal objectives of the Fossil Energy Program are to seek new ideas, new data, fundamental knowledge that will support the ongoing programs, and new processes to better utilize the nation's fossil energy resources with greater efficiency and environmental acceptability. Toward this end, the Department of Energy supports research projects conducted by universities and colleges to: Ensure a foundation for innovative technology through the use of the capabilities and talents in our academic institutions; provide an effective, two-way channel of communication between the Department of Energy and the academic community; and ensure that trained technical manpower is developed to carry out basic and applied research in support of DOE's mission. Fossil Energy's university activities emphasize the type of research that universities can do best - research to explore the potential of novel process concepts, develop innovative methods and materials for improving existing processes, and obtain fundamental information on the structure of coal and mechanisms of reactions of coal, shale oil, and other fossil energy sources. University programs are managed by different Fossil Energy technical groups; the individual projects are described in greater detail in this book. It is clear that a number of research areas related to the DOE Fossil Energy Program have been appropriate for university involvement, and that, with support from DOE, university scientific and technical expertise can be expected to continue to play a significant role in the advancement of fossil energy technology in the years to come.

  12. 29 CFR 96.62 - Contracts.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Contracts. 96.62 Section 96.62 Labor Office of the Secretary of Labor AUDIT REQUIREMENTS FOR GRANTS, CONTRACTS, AND OTHER AGREEMENTS Appeals § 96.62 Contracts. (a... audit, the contractor may appeal the final determination to the DOL Board of Contract Appeals, pursuant...

  13. 43 CFR 2.53 - Government contracts.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Government contracts. 2.53 Section 2.53 Public Lands: Interior Office of the Secretary of the Interior RECORDS AND TESTIMONY; FREEDOM OF INFORMATION ACT Privacy Act § 2.53 Government contracts. (a) Required contract provisions. When a contract...

  14. 77 FR 71458 - New International Mail Contract

    Science.gov (United States)

    2012-11-30

    ... New International Mail Contract AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The... Expedited Package Contracts 1. This document invites public comments on the request and addresses several... additional Global Reseller Expedited Package (GREP) contract (Contracts 1).\\1\\ It seeks to have the instant...

  15. 48 CFR 29.401 - Domestic contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Domestic contracts. 29.401 Section 29.401 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS TAXES Contract Clauses 29.401 Domestic contracts. ...

  16. 7 CFR 1753.11 - Contract amendments.

    Science.gov (United States)

    2010-01-01

    ...) The amendment alters the terms and conditions of the contract or changes the scope of the project... contract to require a contractor's performance bond. This would occur when a contract that is executed in... 7 Agriculture 11 2010-01-01 2010-01-01 false Contract amendments. 1753.11 Section 1753.11...

  17. 48 CFR 904.7201 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 904.7201... MATTERS Public Affairs 904.7201 Contract clause. The contracting officer shall insert the clause at 952.204-75, Public Affairs, in solicitations and contracts that require the contractor to release...

  18. 48 CFR 1336.609 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1336.609 Section 1336.609 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 1336.609 Contract...

  19. 48 CFR 53.111 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contract clause. 53.111... AND FORMS FORMS General 53.111 Contract clause. Contracting officers shall insert the clause at 52.253-1, Computer Generated Forms, in solicitations and contracts that require the contractor to submit...

  20. 48 CFR 819.7009 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 819.7009... Acquisition Program 819.7009 Contract clauses. The contracting officer shall insert VAAR clause 852.219-10... Veteran-Owned Small Business Set-Aside in solicitations and contracts for acquisitions under this subpart. ...