WorldWideScience

Sample records for contract breeding management

  1. Beyond breeding area management

    DEFF Research Database (Denmark)

    Pedersen, Lykke; Thorup, Kasper; Tøttrup, Anders P.

    Every year, billions of songbirds migrate thousands of kilometres between their European breeding grounds and African overwintering area. As migratory birds are dependent on resources at a number of sites varying in both space and time, they are likely to be more vulnerable to environmental chang...... and provide important information for conservation management of migratory birds....

  2. Contract management survey 2002.

    Science.gov (United States)

    Hoppszallern, Suzanna

    2002-10-01

    Spending on clinical contracts continues to outpace spending on business services, but may be leveling off. The 12th annual Contract Management Survey shows that the performance of clinical vendors is now comparable to business service vendors in meeting savings targets. Both business and clinical vendors are receiving higher marks from hospital leaders, but execs quickly respond to low marks by bringing the service back in-house of changing vendors. This report examines trends in outsourcing, satisfaction levels, the decision-making process, contract features and performance, and spending.

  3. PROCUREMENT AND CONTRACT MANAGEMENT

    CERN Multimedia

    Training & Development Group; Linda Orr-Easo; Tel. 72460; Nathalie Dumeaux; Tel. 78144

    2001-01-01

    We are pleased to announce the launch of a new training on: Procurement and Contract Management (This seminar will be run by CERN experts in French or in English) Level 1 The aim is to raise awareness of the key issues involved. Date : 8 June 2001 This level is open to everyone. Participants should register via our Web page as soon as possible. Level 2 To develop the skills needed to effectively manage contracts, from the Technical, Commercial and Legal aspects. Dates : Three days, Autumn 2001 This Level is open to those who are/will be more directly responsible for procurement and contract management. Participants should have followed Level 1. For a description of the seminar, please consult:   Level 1: http://training.web.cern.ch/Training/MANCO/P9798/9-cm_e.htm Level 2: http://training.web.cern.ch/Training/MANCO/P9798/9-cm2_e.htm

  4. 2001 contract management survey.

    Science.gov (United States)

    2001-10-01

    For the second year running, hospitals are spending more on clinical outsourcing than on business services. The Eleventh Annual Contract Services Survey shows that, in clinical areas, executives use outsourcing to acquire specialized expertise with cost savings secondary. Reducing costs and FTEs are the primary reasons for outsourcing business operations. Business service contracts are more likely to meet expectations for cost savings. Overall, satisfaction levels are up, but in some areas there's still a lot of room for improvement. This report examines current trends in outsourcing, strategies for the future, satisfaction levels, the decisionmaking process, contract features, and costs.

  5. Construction contracts law and management

    CERN Document Server

    Hughes, Will; Murdoch, John

    2015-01-01

    The fifth edition of this bestselling textbook has been thoroughly revised to provide the most up-to-date and comprehensive coverage of the legislation, administration and management of construction contracts. It now includes comparisons of working with JCT, NEC3, and FIDIC contracts throughout. Introducing this topic at the core of construction law and management, this book provides students with a one-stop reference on construction contracts. Significant new material covers: procurement tendering developments in dispute settlement commentary on all key legislation, case law and contract amendments In line with new thinking in construction management research, this authoritative guide is essential reading for every construction undergraduate and an extremely useful source of reference for practitioners.

  6. Computerized management support for swine breeding farms

    NARCIS (Netherlands)

    Huirne, R.B.M.

    1990-01-01

    1. INTRODUCTION

    The investigations described in this thesis have been directed towards computerized management support for swine breeding farms, focused on sow productivity and profitability. The study is composed of three basic parts: (1) basic description and

  7. Price management mechanisms and the gas contract

    International Nuclear Information System (INIS)

    Dickson, D.J.

    1996-01-01

    Pricing objectives and risk management strategies that can be achieved through the proper use of the standard gas contract, were discussed. Main topics of discussion were: (1) gas sales contract and convertible pricing, (2) gas contract and imbedded hedging, gas contracts and exchange traded instruments, (4) gas contracts fixed for floating swaps, and OTC options and exotics, (5) options and exotic price structures, and (6) advantages and disadvantages of using the gas contract versus the swap agreement

  8. Analysis of the 314th Contracting Squadrons Contract Management Capability Using the Contract Management Maturity Model (CMMM)

    National Research Council Canada - National Science Library

    Jackson, Jr, Carl J

    2007-01-01

    .... The purpose of this research project is to analyze the 314th Contracting Squadron contracting processes and requirement target areas for improvement efforts by the application of the Contract Management Maturity Model (CMMM...

  9. Towards Certified Management of Financial Contracts

    DEFF Research Database (Denmark)

    Bahr, Patrick; Berthold, Jost; Elsman, Martin

    2014-01-01

    . The seminal work by Peyton-Jones and Eber on financial contracts shows how an algebraic approach to contract specification can be used for valuation of contracts (when combined with a model of the underlying observables) and for managing how contracts evolve under so-called fixings and decision......-taking, with the contracts eventually evaporating into the empty contract, for which no party have further obligations. The ideas have emerged into Eber's company LexiFi, which has become a leading software provider for a range of financial institutions, with all contract management operations centralised around a domain......Banks and financial institutions nowadays often use domain-specific languages (DSLs) for describing complex financial contracts, in particular, for specifying how asset transfers for a specific contract depend on underlying observables, such as interest rates, currency rates, and stock prices...

  10. Management of transport and handling contracts

    CERN Document Server

    Rühl, I

    2004-01-01

    This paper shall outline the content, application and management strategies for the various contracts related to transport and handling activities. In total, the two sections Logistics and Handling Maintenance are in charge of 27 (!) contracts ranging from small supply contracts to big industrial support contracts. The activities as well as the contracts can generally be divided into four main topics "Vehicle Fleet Management"; "Supply, Installation and Commissioning of Lifting and Hoisting Equipment"; "Equipment Maintenance" and "Industrial Support for Transport and Handling". Each activity and contract requires different approaches and permanent adaptation to the often changing CERN's requirements. In particular, the management and the difficulties experienced with the contracts E072 "Maintenance of lifting and hoisting equipment", F420 "Supply of seven overhead traveling cranes for LHC" and S090/S103 "Industrial support for transport and handling" will be explained in detail.

  11. Career Management and the Changing Psychological Contract.

    Science.gov (United States)

    Atkinson, Carol

    2002-01-01

    A 1993 survey in a British bank revealed a lack of strategic approaches to career management and a negative psychological contract. A 2000 follow-up showed that employees viewed the new contract as a regression from a relational to a transactional approach. They had increased responsibility for career development, but management failed to provide…

  12. Assessment of Navy Contract Management Processes

    Science.gov (United States)

    2016-04-30

    capability? • 85% of quality problems are related to processes, while only 15% of problems are controlled by individual workers ( Deming , 1986...eligible participants: 369 • Total surveys completed: 185 • Response rate: 50% CONTRACT MANAGEMENT MATURITY MODEL© MATURITY LEVEL 5...Measurement – Organizations systematically use performance metrics to measure the quality and evaluate the effectiveness of the contract management

  13. Quality management and quality assurance contracts

    International Nuclear Information System (INIS)

    Teichler, M.

    1991-01-01

    Quality assurance contracts belong to the most important instruments of quality management systems. As a result of such contracts, quality control is to be done not only by the buyer, but is made a task to be fulfilled by the manufacturer. The author of the article shows that quality assurance contracts do change the contractual relationship between supplier and buyer, but have no effect on economic and practical conditions. This is so because quality assurance contracts apply only to warranty claims, which play a subordinate role in the legal relationship between producer and buyer, or producer and consumer, as compared to the claims for damages arising out of the contracts. (orig.) [de

  14. Managing meiotic recombination in plant breeding

    NARCIS (Netherlands)

    Wijnker, T.G.; Jong, de J.H.S.G.M.

    2008-01-01

    Crossover recombination is a crucial process in plant breeding because it allows plant breeders to create novel allele combnations on chromosomes that can be used for breeding superior F1 hybrids. Gaining control over this process, in terms of increasing crossover incidence, altering crossover

  15. Sustainable apple breedings needs sustainable marketing and management

    OpenAIRE

    Weber, M.

    2008-01-01

    Apple breeding programmes are currently in the middle of transition in terms of ownership and management. Until now most of them were funded by the public. Breeding took place by traditional methods since decades in a very sustainable way to develop better apple varieties. Today, increasing loss of national boundaries and globalisation, less interest by national bodies and institutions and rising cost levels for high tech breeding methods entire programmes are nowadays urged to...

  16. 6th Workshop on waste management contracts

    International Nuclear Information System (INIS)

    2000-01-01

    The workshop was intended for participants from industry and the service sector and municipalities responsible in particular for the legal aspects involved in the waste management business, namely for concluding the contracts with customers and contractors and for contract management in compliance with the laws and regulations of Germany and the European Union, including the relevant pollution control and monitoring obligations. Participants of the workshop received in-depth information and guidance through discussion of contracts and document types of relevance in this context. (orig./CB) [de

  17. Defense Contract Management Command Support to System Acquisition Program Managers

    National Research Council Canada - National Science Library

    1999-01-01

    .... This report discusses the planning of contract administration office support to system acquisition program managers through the program integration process and the customer support outreach program...

  18. Financial Management: Reopening of Contracts in the Mechanization of Contract Administration Services System

    National Research Council Canada - National Science Library

    Granetto, Paul

    2003-01-01

    .... In anticipation of transitioning to the new contract payment system, the Defense Finance and Accounting Service and the Defense Contract Management Agency were attempting to close out as many contracts as possible...

  19. 48 CFR 2452.242-71 - Contract management system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract management system... 2452.242-71 Contract management system. As prescribed in 2442.1107, insert the following clause: Contract Management System (FEB 2006) (a) The contractor shall use contract management baseline planning...

  20. Integrated project management type contracts

    International Nuclear Information System (INIS)

    Heisler, S.I.

    1975-01-01

    The concept of integrated project management represents a single source to which the owner can turn for all project management functions excepting for those relating to outside parties such as site purchase, personnel selection etc. Other functions such as design, procurement, construction management, schedule and cost control, quality assurance/quality control are usually handled by the integrated project manager as the agent of the owner. The arrangement is flexible and the responsibilities can be varied to suit the size and experience of the owner. Past experience in the United States indicates an increase in the trend toward IPM work and it appears that overseas this trend is developing also. (orig./RW) [de

  1. Information technology: management issues in outsource contracts.

    OpenAIRE

    2008-01-01

    This study concerns the investigation of management issues within information technology outsourcing contracts. The information technology outsourcing life cycle is used as the flow structure for the investigation. The associated user expectations that occur in each of the phases of the information technology outsourcing life cycle are identified. Following the identification of the management and user expectation issues in each phase of the outsource life cycle, the “Coetzee solution framewo...

  2. The missing link between maintenance contracts and flexible asset management

    OpenAIRE

    Marttonen-Arola, Salla; Viskari, Sari; Kärri, Timo

    2013-01-01

    The paper shows how additional value can be created in maintenance collaboration through integrating the features of flexible asset management into maintenance contracts. We expand the traditional typology of maintenance contracts and introduce a new contract type, flexible asset management contracts. Also value sharing in the new contract type is discussed. Our logic for sharing the value is based on reaching for win-win situations in industrial maintenance collaboration. Finally, we present...

  3. Multiple Challenges of Flexible Workforce Management: the contract managers experience

    Directory of Open Access Journals (Sweden)

    Yana Torres de Magalhães

    2010-07-01

    Full Text Available This article presents the results of a survey that had the purpose to evaluate the human resources (HR practices adopted by a Brazilian industrial corporation from the viewpoint of contracting out managers to deal with four flexible workforce management challenges: qualification; quality; commitment; standardization of outsourcing services. These HR practices are still little discussed by scholars. So, this is the main contribution of this article. It is also virtually nonexistent in the literature studies that encompass analysis about HR practices to deal with major challenges of outsourcing throughout the viewpoint of contracting out managers. We performed 15 semi-structured interviews with contracting out managers. It was also performed a documental analysis about the rules of outsourcing practices of the corporation. We found management practices to deal with each of the four challenges presented. The management of contracts and the provision of training programs were the most prominent of the related practices. The results show that Brazillian labor laws contribute to the segregation of temporary workers, because the companies avoid a more direct relationship fearing legal constraints. Although several efforts were put to improve the work conditions of the flexible workforce, these workers are still stigmatized, seen and treated as less important than direct employers; this causes negative impacts on commitment. The decision to use flexible workforce by companies is still mainly due to cost savings. Therefore, there is still a long way to improve HR practices related to temporary workers in order to avoid losses for all the social actors envolved.

  4. Risk management and oil trading contracts

    International Nuclear Information System (INIS)

    Sas, B.

    1992-01-01

    The oil market provides an excellent case study for an analysis of the commodity trading risks and the development of contractual instruments and market structures to meet these risks. The paper identifies the main risks, namely performance, credit/payment, price, regulatory, fiscal, and ''trading'' risk. A conceptual framework provides the basis to trace the evolution of the risk management instruments from relational (e.g. long-term), through ''transactional'' (e.g. spot and forwards) to ''institutional'' (e.g. futures and options) and finally ''pricing'' (e.g. swaps and trigger pricing) contracts. (author)

  5. Why Training for Service Contract Management is Mission Essential

    National Research Council Canada - National Science Library

    Friar, Allen

    2005-01-01

    ... Programs provide vital services and act as force multipliers for forward deployment units. Consequently, a transformation in contracting and acquisition leadership along with proper planning is necessary to manage contracts...

  6. The Contract Management Body of Knowledge: A Comparison of Contracting Competencies

    Science.gov (United States)

    2013-12-01

    and supply chain management policies in an effort to deliver higher returns for their companies ( KPMG , 2012). As purchasing becomes increasingly more...conservation, hazardous materials , and ozone-depleting substances (NCMA, 2011). Contract Structures (1.5) has to do with identifying specific contract types...discusses time and material contracts as well as cost, performance, and delivery incentives. Incentive and award-fee contracts pertaining to fixed-price

  7. Review: Towards the agroecological management of ruminants, pigs and poultry through the development of sustainable breeding programmes. II. Breeding strategies.

    Science.gov (United States)

    Phocas, F; Belloc, C; Bidanel, J; Delaby, L; Dourmad, J Y; Dumont, B; Ezanno, P; Fortun-Lamothe, L; Foucras, G; Frappat, B; González-García, E; Hazard, D; Larzul, C; Lubac, S; Mignon-Grasteau, S; Moreno, C R; Tixier-Boichard, M; Brochard, M

    2016-11-01

    be used more effectively if they benefited from the scientific and technical resources currently available for more common breeds. Last but not least, public policies need to enable improved information concerning the genetic resources and breeding tools available for the agroecological management of livestock production systems, and facilitate its assimilation by farmers and farm technicians.

  8. Outsourcing Contract Success: A Quality Management Perspective

    OpenAIRE

    Vanita Yadav; B.A. Metri

    2010-01-01

    Despite the phenomenal growth in outsourcing of various business functions like Enterprise Systems outsourcing, IT outsourcing, and Business Process outsourcing, there has been relatively less attention given to the high-risk area of outsourcing contracts. In this regard, contract has been the conventional medium for governing outsourcing relationships. This study aims to bring forward the importance of quality in the entire contracting process, involving contract planning, pre-contract negot...

  9. Retrospective and statistical analysis of breeding management on the Italian Heavy Draught Horse breed.

    Science.gov (United States)

    Mantovani, R; Sartori, C; Pigozzi, G

    2013-07-01

    This study investigated some aspects of breeding management in the Italian Heavy Draught Horse breed, aiming at improving its efficiency at stud farm level. A first aim was to evaluate the risk of unsuccessful reproduction in mares after an early (3 years) or normal (4 years) age at first foaling, in interaction with different stud rearing systems. A second objective was the examination of the mean time length in which young 2-year-old stallions maintain a genetic superiority on older proven stallions, identifying a 'genetic lifespan' in which young stallions can be safely used for reducing the cost of services. Reproductive performance at first and second foaling of 1513 mares were used. Mares had a normal first foal at 3 (n = 745) or 4 years of age (n = 768) in stud farms on the basis of stable (n = 488), feral (n = 345) or semi-feral (n = 680) rearing systems. Logistic regression analysis was performed by modeling the risk of unsuccessful reproduction in the subsequent season (i.e., results at second foaling), as affected by the interaction of age at first foaling × rearing system (six classes). Genetic lifespan of young stallions was estimated by regressing the least square means from a mixed model analysis for repeated measures of individual differences in 'total merit' estimated breeding values (EBVs) between young stallions (mean no. of 45/year) and the mean EBV of all proven stallions in a given year of genetic evaluation (mean no. of 483/year). Young stallions born between 1999 and 2005 were used, following each generation (i.e., birth year) from 2 to 7 subsequent yearly genetic evaluations. In comparison with the best reproductive success of second foaling at 4 years in stable systems, the greatest risk of unsuccessful reproduction was at 3 years in feral (+167%) and 3 years in semi-feral conditions (+91%). Young stallions showed a 0.50 s.d. greater EBV at the first evaluation than proven stallions, with a mean annual decrease in EBV of 0.07 s.d./year on

  10. Measuring Satisfaction in the Program Manager, Procuring Contracting Officer Relationship

    Science.gov (United States)

    1997-12-01

    Contracting Officer) and one of her customers (a U. S. Navy Program Manager ). From an examination of this relationship , the most appropriate criteria... Customer Satisfaction, Performance Measurement, Metrics, Contracting, Program Management 17. SECURITY CLASSIFICATION OF REPORT Unclassified...methodology for developing an instrument to measure the satisfaction of their customers , Navy Program Managers . The purpose of this thesis was to develop

  11. Dynamic contracting mechanism for pavement maintenance management

    NARCIS (Netherlands)

    Demirel, H.C.; De Ridder, H.A.J.

    2013-01-01

    Technological advances, financial possibilities and changes of demands have increasingly affected the pavement maintenance environment for outsourcing in recent years. This induces complexity in the contracting methods of pavement maintenance activities. Despite the fact that current contracting

  12. Measuring Satisfaction in the Program Manager, Procuring Contracting Officer Relationship

    National Research Council Canada - National Science Library

    Gray, John

    1997-01-01

    .... To comply with this Executive Order, Navy contracting offices require an effective methodology for developing an instrument to measure the satisfaction of their customers, Navy Program Managers...

  13. Certified symbolic management of financial multi-party contracts

    DEFF Research Database (Denmark)

    Bahr, Patrick; Berthold, Jost; Elsman, Martin

    2015-01-01

    Domain-specific languages (DSLs) for complex financial contracts are in practical use in many banks and financial institutions today. Given the level of automation and pervasiveness of software in the sector, the financial domain is immensely sensitive to software bugs. At the same time...... automatically extract a Haskell implementation of an embedded contract DSL along with the formally verified contract management functionality. This approach opens a road map towards more reliable contract management software, including the possibility of analysing contracts based on symbolic instead of numeric...

  14. Managing the financial cost of exception to contracting standards

    DEFF Research Database (Denmark)

    Henschel, Rene Franz

    2008-01-01

    In managing financial cost of exception to contracting standards, the first step is to put up an intelligent contract standards exception monitoring system The next step is to maintain tailor-made, fair and transparent contracting standards The third step is to eliminate unnecessary information...... and repetitiveness in contracting standards The fourth step is to enable your organization and the customers or suppliers to handle the necessary exceptions themselves Finally you should consider the use of independent contracting standards and elimination of your own standards as a tool in managing the cost...

  15. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  16. Selective breeding: the future of TB management in African buffalo?

    Science.gov (United States)

    le Roex, N; Berrington, C M; Hoal, E G; van Helden, P D

    2015-09-01

    The high prevalence of bovine tuberculosis (BTB) in African buffalo (Syncerus caffer) in regions of southern African has a negative economic impact on the trade of animals and animal products, represents an ecological threat to biodiversity, and poses a health risk to local communities through the wildlife-cattle-human interface. Test and cull methods may not be logistically feasible in many free-range wildlife systems, and with the presence of co-existing BTB hosts and the limited effectiveness of the BCG vaccine in buffalo, there is a need for alternative methods of BTB management. Selective breeding for increased resistance to BTB in buffalo may be a viable method of BTB management in the future, particularly if genetic information can be incorporated into these schemes. To explore this possibility, we discuss the different strategies that can be employed in selective breeding programmes, and consider the implementation of genetic improvement schemes. We reflect on the suitability of applying this strategy for enhanced BTB resistance in African buffalo, and address the challenges of this approach that must be taken into account. Conclusions and the implications for management are presented. Copyright © 2015 Elsevier B.V. All rights reserved.

  17. Contract Design: Risk Management and Evaluation.

    Science.gov (United States)

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Effective risk adjustment is an aspect that is more and more given weight on the background of competitive health insurance systems and vital healthcare systems. The risk structure of the providers plays a vital role in Pay for Performance. A prerequisite for optimal incentive-based service models is a (partial) dependence of the agent's returns on the provider's gain level. Integrated care systems as well as accountable care organisations (ACOs) in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced. Little is known about the contractual design and the main challenges of delegating "accountability" to these new kinds of organisations and/or contracts. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore information asymmetries and contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. The research question in this article focuses on how reimbursement strategies, evaluation of measures and methods of risk adjustment can best be integrated in healthcare contracting. Each integrated care contract includes challenges for both payers and providers without having sufficient empirical data on both sides. These challenges are clinical, administrative or financial nature. Risk adjusted contracts ensure that the reimbursement roughly matches the true costs resulting from the morbidity of a population. If reimbursement of care provider corresponds to the actual expenses for an individual/population the problem of risk selection is greatly reduced. The currently used methods of risk adjustment have widely differing model and forecast

  18. Contract Design: Risk Management and Evaluation

    Directory of Open Access Journals (Sweden)

    Axel C. Mühlbacher

    2018-01-01

    Full Text Available Introduction: Effective risk adjustment is an aspect that is more and more given weight on the background of competitive health insurance systems and vital healthcare systems. The risk structure of the providers plays a vital role in Pay for Performance. A prerequisite for optimal incentive-based service models is a (partial dependence of the agent’s returns on the provider’s gain level. Integrated care systems as well as accountable care organisations (ACOs in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced.  Methods: Little is known about the contractual design and the main challenges of delegating “accountability” to these new kinds of organisations and/or contracts. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore information asymmetries and contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. The research question in this article focuses on how reimbursement strategies, evaluation of measures and methods of risk adjustment can best be integrated in healthcare contracting.  Results: Each integrated care contract includes challenges for both payers and providers without having sufficient empirical data on both sides. These challenges are clinical, administrative or financial nature. Risk adjusted contracts ensure that the reimbursement roughly matches the true costs resulting from the morbidity of a population. If reimbursement of care provider corresponds to the actual expenses for an individual/population the problem of risk selection is greatly reduced. The currently used methods

  19. Post contract / Project management in Nuclear Malaysia

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim

    2010-01-01

    Full-text: Post contract is a period from issuance certificate of practical completion until final statement of account of the project. If this procedure not completed the whole project will at large, create customers un-satisfaction, contractual obligation not complied, record not completed and financial setback. With the usage terms of contract, standard JKR circulars, treasury circulars and JKR quality manual BKJ will produce new Standard operating procedure, SOP with regards to these matters. In doing so it shall increase customer satisfaction and reduce time to finalise project and provide good record system. Keywords: Post contract, certificate of practical completion, final account, customer satisfaction, Standard operating procedure. (author)

  20. Asset Allocation and Optimal Contract for Delegated Portfolio Management

    Science.gov (United States)

    Liu, Jingjun; Liang, Jianfeng

    This article studies the portfolio selection and the contracting problems between an individual investor and a professional portfolio manager in a discrete-time principal-agent framework. Portfolio selection and optimal contracts are obtained in closed form. The optimal contract was composed with the fixed fee, the cost, and the fraction of excess expected return. The optimal portfolio is similar to the classical two-fund separation theorem.

  1. An Analysis of Category Management of Service Contracts

    Science.gov (United States)

    2017-12-01

    comprised of four steps to guide future category management teams in analyzing data and applying Category Management principles through the use of...NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT AN ANALYSIS OF CATEGORY MANAGEMENT OF SERVICE CONTRACTS December 2017...Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project

  2. Managing the relational character of public-private partnership contracts

    Directory of Open Access Journals (Sweden)

    Cvetković Predrag

    2015-01-01

    Full Text Available A public-private partnership contract has the character of a relational contract. Relational contracts are incomplete agreements governing transactions where the contracting parties have mutually agreed that it is impossible or economically inefficient to contractually define ex ante possible difficulties and contingencies in the contract implementation, nor the difficulties and contingencies underlying the ex post control of contract performance by a third entity (court or arbitration. Considering the methodology of managing relational contracts, it is essential that the theory of relational contracts does not advocate for the establishment of relational contracts as a separate category of contracts, with specifically designated contractual instruments. This theory defines the relational contract as a category which legitimizes 'the relational mode' of a particular contract. The methodology of relational contracts is important for contracts on public-private partnership as it ensures that the contractual relationship is aligned with the changes in the immediate environment where the PPP contract operates. The aforementioned alignment has two aspects. The first one is the ex ante aspect of the alignment which is primarily aimed at preventing the detrimental effect of such alignment to the public partner's interests. Therefore, the intent to prevent such an effect shall be taken into account when defining the criteria for the selection of the most favorable private partner and the best offer. At the same time, it is essential to establish verifiable standards for measuring the private partner performance in the phase of contract implementation. For this goal to be achieved, it is crucial to specify the subject matter of the private partner's obligations, to establish the priority rank of PPP project objectives, to elaborate on the specific requirements governing the eligibility of private partners to participate in the bidding process, to specify

  3. Goat farming systems in Martinique: management and breeding strategies.

    Science.gov (United States)

    Alexandre, G; Leimbacher, F; Maurice, O; Domarin, D; Naves, M; Mandonnet, N

    2009-04-01

    To be successful, initiatives to improve farmer's goat production should directly address the needs and objectives of the keepers while promoting rational use of local genetic resources. A survey was carried out to implement a genetic policy governing meat goat farming in Martinique (11,400 heads and 33,400 ha arable land). The questionnaire comprised a total of 27 items with 306 modalities, and included questions on farm structure, crop and animal productions, management of feeding, reproduction and health control. The sample consisted of 33 farmers with 644 ha and 2,680 goats (1,286 does and 52 bucks), 97% of does in the studied sample were crossbred, 56% of bucks were" imported" breeds (Boer or Anglo-Nubian). The number of goats per farm varied from 16 to 582. The feeding system was predominantly grazing, according to a rotation (55% of cases) or continuous grazing system (42%). On 62% of farms, the males remained with the females permanently, also 83% of farmers did not resort to methods of controlled-mating. The first criteria used for choosing animals (80 to 90% of answers) of both sex, were development and conformation. Assuming that adaptive together with productive traits are important in tropical zones, it is advisable to better define the maternal lineage of the local livestock (presently very sparse records), to improve reproduction management and culling strategies (poor and inadequate management practices do not support any genetic improvement programme), and to guide the farmers in their decisions by employing concerted interprofessional actions (choice of meat breed, market studies).

  4. Development of Czech Software for Managing of Cattle Breeding

    Directory of Open Access Journals (Sweden)

    Iveta Novotná

    2016-10-01

    Full Text Available Cattle breeding, a traditional sector of agricultural production, is currently recording a very intensive development caused by the effort of farmers to maximize production and especially their profit. Rapid implementation of new technologies, that help to achieve this goal, cannot be reliably carried out without the use of modern computer and transmission technology controlled by a quality control program. Absence of a similar system on our market led the company Agrosoft to develop a system sorting according to register designed for all types of farming, regardless of the amount of housed animals. The product was created in a Czech company, respects traditional local customs and his undisputable contribution is the subsequent connection to superior organizations operating in the Czech Republic. Complexity of this newly developed product is brought almost to perfection and allows producers to work with the files of needed information fundamentally anywhere and anytime. The new software improves and accelerates the managing work in breeding companies and consequently helps to improve the quality of final products to increase their profitability.

  5. Taboos and social contracts: Tools for ecosystem management ...

    African Journals Online (AJOL)

    Traditional taboos and social contracts played an important role in managing the Manambolomaty RAMSAR site. Taboos are defined as a prohibition imposed by social custom as a protective measure' and social contracts are – in conservation sense – a common agreement for achieving conservation, sustainable ...

  6. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Science.gov (United States)

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  7. Organization and management of the LHC civil-engineering contracts

    CERN Document Server

    Watson, T

    1999-01-01

    Since July 1994, the CERN Civil Engineering group within the ST division has been preparing and engaging contracts related to the Large Hadron Collider (LHC) project. Several of these contracts have values in excess of 10 MCHF and will be executed over a number of years; as such they represent an important part of the infrastructure works required for the LHC. To date, in excess of two hundred and fifty companies have been consulted in relation to these contracts. Contracts or orders have been placed with over thirty companies or joint ventures of companies from nearly all the CERN Member States. This paper aims to show the inter-relationships between these contracts and how the Civil Engineering group is carrying out the management of these important LHC contracts. The organization of the group will be explained along with the roles of individual members within the group.

  8. Management of Contract Waivers and Deviations for Defense Systems

    National Research Council Canada - National Science Library

    1998-01-01

    This report is the fourth and final in a series of reports resulting from our audit of management of contract waivers and deviations for Defense systems and summarizes our overall evaluation. Report...

  9. Privacy Impact Assessment for the Integrated Contracts Management System

    Science.gov (United States)

    The Integrated Contracts Management System collects contact information and other Personally Identifiable Information (PII). Learn how this data will be collected in the system, how it will be used, access to the data, and the purpose of data collection.

  10. 14 CFR 91.1003 - Management contract between owner and program manager.

    Science.gov (United States)

    2010-01-01

    ... program manager. 91.1003 Section 91.1003 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT... RULES Fractional Ownership Operations § 91.1003 Management contract between owner and program manager. Each owner must have a contract with the program manager that— (a) Requires the program manager to...

  11. Italy. Electrical contract management in local government

    International Nuclear Information System (INIS)

    Carsana, C.

    1999-01-01

    The technical and economical assessment of electric energy consumption of a public administration body (province) shows remarkable opportunities of reducing energy costs. This calls for a continuous monitoring of the supply contract parameters. It is also discussed the solution concerning the transparency in supplier-customer relationship [it

  12. Contract en conflict : Strategisch Management van Inkooptransacties

    NARCIS (Netherlands)

    Rooks, Gerrit

    2002-01-01

    Dissertation of the University of Utrecht The reality of business relations is opposed to the assumptions commonly held by legal experts on the role of contract law in society, or so Macaulay (see his classic 1963 study) would have us believe. Empirical studies Macaulay conducted in the United

  13. Contract Management: Organisational and Legal Form of Hotel Networks

    OpenAIRE

    Burak Tatyana V.

    2013-01-01

    Hotel business has been the most dynamic and profitable segment of economy, which is characterised with a high degree of internationalisation of capital and international character, during the recent decades. We clearly observe development of national and international hotel networks at this stage. Management contract is one of the methods of development and creation of hotel networks. The article describes theoretical basis of introduction of the contract management into the hotel business, ...

  14. Financial Management: Contracts Classified as Unreconcilable by the Defense Finance and Accounting Service Columbus (Contract DAAA09-81-G-2008-0031)

    National Research Council Canada - National Science Library

    Granetto, Paul J; Kornides, James L; Issel, John K; Knight, Clarence E., III; Frawley, John; Bennett, Karen M

    2005-01-01

    .... Defense Contract Management Agency (DCMA), Pittsburgh, Pennsylvania, personnel stated that the former Defense Contract Administration Services Region Philadelphia initially paid the contract until the payment function was transferred...

  15. Comparative analysis between the manager contract and the administrator contract in the activity of hotel services from Romania

    Directory of Open Access Journals (Sweden)

    Neacșu, A.

    2012-01-01

    Full Text Available In the activity of any hotel company, the manager or the administrator plays an important role; that is why the relationships of the hotel units with managers and administrators must be well defined and assumed by both sides by means of specific contracts. Between the manager contract and the administrator contract there are similarities, but also differences. This paper analyzes the advantages and disadvantages that the two contracts present and also the situations in which they are recommended.

  16. Contract Management Process Maturity: Empirical Analysis of Organizational Assessments

    Science.gov (United States)

    2009-08-27

    with the National Contract Management Association (NCMA), a Certified Purchasing Manager ( CPM ) with the Institute for Supply Management (ISM), and a...include advertising procurement opportunities, conducting industry and pre-proposal conferences, and amending solicitation documents as required. 4...with organizational core processes include advertising procurement opportunities, conducting solicitation and pre-proposal conferences, and amending

  17. Raise the management level of EPC contracting in six aspects

    International Nuclear Information System (INIS)

    Wang Baowei; Feng Shoujia

    2010-01-01

    Nuclear power construction develops rapidly today and EPC contracting for nuclear power projects, as a strategic decision of CNNC, has become a tendency. The target of engineering management can be smoothly realized or achieved by doing a good job in the following six aspects: effective communication between divisions of project department, high-degree consistency of managerial concepts for project management staff, clear objective for different divisions in the project department, presence of rules to be observed in construction management work, avoidance of human-initiated errors in the project, and clear distinction of management control concept. It is hoped that, through exchange and practice, management procedures and consciousness for EPC contracting can be further standardized and thus the level of management for EPC contracting will be raised finally. (authors)

  18. Raise the management level of EPC contracting in six aspects

    International Nuclear Information System (INIS)

    Wang Baowei; Feng Shoujia

    2010-01-01

    Nuclear power construction develops rapidly today and EPC contracting for nuclear power projects, as a strategic decision of CNNC, has become a tendency. The target of engineering management can be smoothly realized or achieved by doing a good job in the following six aspects:effective communication between divisions of project department, high-degree consistency of managerial concepts for project management staff, clear objective for different divisions in the project department, presence of rules to be observed in construction management work, avoidance of human-initiated errors in the project, and clear distinction of management control concept. It is hoped that, through exchange and practice, management procedures and consciousness for EPC contracting can be further standardized and thus the level of management for EPC contracting will be raised finally. (authors)

  19. Providing Technical Expertise for Effective Contract Management

    Science.gov (United States)

    2011-04-12

    back to both the finance leg and the contracting leg . In order to avoid a conflict of interest or give the impression of 4 any improprieties...each leg of this triad is separate. It is this reason and those already mentioned that the COR is the responsibility of the requiring activity and...A. Fulghum, DoD Logistician Optimistic About Afghanistan (Aviation Week’s DTI , January 27, 2010) as reported on military.com, accessed on 15 February

  20. A 'new' psychological contract for nurses: some management implications.

    Science.gov (United States)

    Cavanagh, S J

    1996-03-01

    Changes within the health services are raising a number of employment issues for nurses. The idea that a professional qualification and a job will lead to security of employment and career development is rapidly changing. These assumptions, the 'old' psychological contract, is giving way to new expectations from employers and employees; the emergence of a 'new' psychological contract. A psychological contract is an implicit agreement between employer and employee that each party will treat the other fairly. Such contracts are maintained by virtue of all parties wanting to seek agreement on issues where possible and to maintain trust. While such a contract is not a legally binding agreement it is nonetheless a binding understanding between people. Changes to this psychological contract can have important implications for individuals and their employer in terms of work and organizational commitment. This paper will discuss some of the issues surrounding psychological contracts and the impact of violating them. It will also discuss, from a management perspective, how psychological contracts develop between employer and employee, and how to form a 'new' psychological contract based upon mutual benefit and shared values.

  1. Final Report on the Audit of the Administration of the Contract Closeout Process at the Defense Contract Management Region, Dallas

    Science.gov (United States)

    1990-09-18

    This is our final report on the Audit of the Administration of the Contract Closeout Process at the Defense Contract Management Region, Dallas (DCMR... audit was made from January to October 1989. The objectives of the audit were to determine the timeliness of the contract closeout process, the validity...As part of the audit , we also evaluated internal controls over the contract closeout process. As of December 31, 1988, the Contract Administration

  2. Department of Energy contract/business management initiatives

    International Nuclear Information System (INIS)

    Fisher, S.B.

    1992-01-01

    More than 40 years ago the Department of Energy (DOE) developed a unique contractual instrument called a management and operating contract, to be used for the operation of our weapons production plants and the national laboratories. The contracts are very broad in scope. There is no output objective set forth in the contract. There are no cost targets, nor any contractually motivated cost objectives. Performance is measured against criteria which is often subjective. The time has come to make changes in the structure of these contracts to reflect changes in the work being performed and to make the contractors more accountable. DOE's work now, at these sites, and for years to come, consists largely of major project-type work such as environmental restoration which lends itself to a more definitized structure. DOE is in the process of implementing a work order authorization control system (task order contracting) under its management and operating contracts. Target date for implementation for our for-profit contractors is FY 1992, and for the non-profit contractors is FY 1993. Under this system, requirements will be contracted for as entities of work and contractors will be held accountable for performance, schedules and costs. Billings, payments and award fee will be tied to the specific planning objectives set forth in the tasks, including costs and schedules. Incentives will be provided for outstanding performance, fee may be withheld if performance is unacceptable. These changes will necessitate more DOE oversight of contractor operations and sound business support systems, as well as effective management disciplines. US DOE will perform business management reviews to assure contractors' systems are adequate and to support this form of contracting. The Contractor Procurement Systems Review Program will be enhanced to assure good subcontractor procurement practices

  3. Incentive Contracts and Hedge Fund Management

    OpenAIRE

    Jens Carsten Jackwerth; James E. Hodder

    2005-01-01

    This paper investigates dynamically optimal risk-taking by an expected-utility maximizing manager of a hedge fund. We examine the effects of variations on a compensation structure that includes a percentage management fee, a performance incentive for exceeding a specified highwater mark, and managerial ownership of fund shares. In our basic model, there is an exogenous liquidation barrier where the fund is shut down due to poor performance. We also consider extensions where the manager can vo...

  4. 25 CFR 533.2 - Time for submitting management contracts and amendments.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Time for submitting management contracts and amendments. 533.2 Section 533.2 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR MANAGEMENT CONTRACT PROVISIONS APPROVAL OF MANAGEMENT CONTRACTS § 533.2 Time for submitting management contracts and...

  5. Factors influencing breeding success, ovarian cyclicity, and cub survival in zoo-managed tigers (Panthera tigris).

    Science.gov (United States)

    Saunders, Sarah P; Harris, Tara; Traylor-Holzer, Kathy; Beck, Karen Goodrowe

    2014-01-10

    Understanding factors that influence reproduction and offspring survival in zoo populations is critical for management of threatened and endangered species. Examination of long-term data (1989-2011) compiled from the Association of Zoos and Aquarium's zoo-managed tiger breeding program provides the basis for a more thorough understanding of reproduction and scientifically based decisions for effective population management in this endangered felid. Biological and management-related factors that could influence tiger breeding success and cub survival were evaluated using logistic mixed models. Breeding success improved with female age until approximately age five, then declined thereafter. Experienced female breeders had greater breeding success than inexperienced females. Litter size was most predictive of cub survival, with average-sized litters (3-4 cubs) experiencing the highest proportional survival. Management-related factors, such as whether the breeding institution had a recent tiger litter and whether both animals were already located at the same institution, also influenced breeding success and cub survival. These results highlight the importance of institutional husbandry experience and the need to retain knowledge through staff turnovers to achieve optimal reproductive success. Using fecal estrogen data, frequency of ovarian cyclicity and mean cycle length did not differ by female age or parity; thus, lack of cyclicity and/or increased cycle duration are not likely explanations for declining breeding success with age. These results provide valuable reproductive information that should improve scientific management of zoo-based tiger populations. Copyright © 2013 Elsevier B.V. All rights reserved.

  6. R and D contract management systems in the USA (Attachment); Beikoku ni okeru R and D contract kanri system (tenpu shiryohen)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    Presented herein is the attachment for 'R and D contract management systems in the USA'. The major contents include regulations governing the R and D contracts, procedures for the R and D contracts, financial procedures for the R and D contracts, procedures for the alternative R and D contracts, financial management of the R and D contracts, and activities for the management of the contract processes by electronic systems. (NEDO)

  7. R and D contract management systems in the USA (Attachment); Beikoku ni okeru R and D contract kanri system (tenpu shiryohen)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    Presented herein is the attachment for 'R and D contract management systems in the USA'. The major contents include regulations governing the R and D contracts, procedures for the R and D contracts, financial procedures for the R and D contracts, procedures for the alternative R and D contracts, financial management of the R and D contracts, and activities for the management of the contract processes by electronic systems. (NEDO)

  8. Program management: The keys to a successful ERWM contract

    International Nuclear Information System (INIS)

    Lenyk, R.G.; Cusack, J.G.

    1995-01-01

    Program management for a large Environmental Restoration and Waste Management (ERWM) task order contract is both a skill and an art. Unlike project management, program management deals with global and political issues, with both client and home organizations, as well as with day-to-day operations. Program management requires up-front planning and nurturing, for no contract matures successfully by itself. This paper identifies the many opportunities presented in the planning and initial implementation of the contract. Potential traps are identified so that they can be recognized and avoided or mitigated. Teaming and subcontracting are also addressed. The authors rely on years of program management experience to explore such questions as the following: Can you have an integrated team? What needs to be done before you sign Your contract? Do you know who your client(s) is(are)? Have you incorporated the relevant, especially any new, procurement strategies? The US Department of Energy-Oak Ridge Operations (DOE-ORO) ERWM Remedial Design Contract with Foster Wheeler Environmental Corporation is used as a model for exploring these topics. This ERWM Program-which focuses on the Oak Ridge National Laboratory, the Y-12 Weapons Plant, and the K-25 Site in Oak Ridge, Tennessee; the Paducah Gaseous Diffusion Plant in Paducah, Kentucky; and the Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio-is in its fifth year with over 225 task orders. The program has been highly successful and has obtained from DOE outstanding marks for achieving quality, responsiveness, timeliness, and subcontracting goals

  9. Reengineering and health physics within the project Hanford management contract

    International Nuclear Information System (INIS)

    Atencio, E.M.

    1997-01-01

    The impending transition of the Hartford Site management and operations (M ampersand O) contract to a management and integrating (M ampersand I) contract format, together with weak radiological performance assessments by external organizations and reduced financial budgets prompted the 're-engineering' of the previous Hanford prime contractor Radiological Control (Rad Con) organization. This paper presents the methodology, identified areas of improvements, and results of the re-engineering process. The conversion from the M ampersand O to the M ampersand I contract concept resulted in multiple independent Rad Con organizations reporting to separate major contractors who are managed by an integrating contractor. This brought significant challenges when establishing minimum site standards for sitewide consistency, developing roles and responsibilities, and maintaining site Rad Con goals. Championed by the previous contractor's Rad Con Director, Denny Newland, a five month planning effort was executed to address the challenges of the M ampersand I and to address identified weaknesses. Fluor Daniel Hanford assumed the responsibility as integrator of the Project Hanford Management Contract on October 1, 1996. The Fluor Daniel Hanford Radiation Protection Director Jeff Foster presents the results of the re-engineering effort, including the significant cost savings, process improvements, field support improvements, and clarification of roles and responsibilities that have been achieved

  10. Management of Liquidity Risk Using Foreign Exchange Swap Contracts

    Directory of Open Access Journals (Sweden)

    Ivica Prga

    2009-12-01

    Full Text Available Croatian banks, like the other world banks, are exposed to liquidity risk. This is very significant question to them, particularly in this complex and crisis time. Therefore, the Croatian banks pay much attention to the management of liquidity. In these attempts, the banks use various derivative financial instruments of which the foreign exchange swap contracts are particularly remarkable.

  11. The design of optimal electric power demand management contracts

    Science.gov (United States)

    Fahrioglu, Murat

    1999-11-01

    Our society derives a quantifiable benefit from electric power. In particular, forced outages or blackouts have enormous consequences on society, one of which is loss of economic surplus. Electric utilities try to provide reliable supply of electric power to their customers. Maximum customer benefit derives from minimum cost and sufficient supply availability. Customers willing to share in "availability risk" can derive further benefit by participating in controlled outage programs. Specifically, whenever utilities foresee dangerous loading patterns, there is a need for a rapid reduction in demand either system-wide or at specific locations. The utility needs to get relief in order to solve its problems quickly and efficiently. This relief can come from customers who agree to curtail their loads upon request in exchange for an incentive fee. This thesis shows how utilities can get efficient load relief while maximizing their economic benefit. This work also shows how estimated customer cost functions can be calibrated, using existing utility data, to help in designing efficient demand management contracts. In order to design such contracts, optimal mechanism design is adopted from "Game Theory" and applied to the interaction between a utility and its customers. The idea behind mechanism design is to design an incentive structure that encourages customers to sign up for the right contract and reveal their true value of power. If a utility has demand management contracts with customers at critical locations, most operational problems can be solved efficiently. This thesis illustrates how locational attributes of customers incorporated into demand management contract design can have a significant impact in solving system problems. This kind of demand management contracts can also be used by an Independent System Operator (ISO). During times of congestion a loss of economic surplus occurs. When the market is too slow or cannot help relieve congestion, demand management

  12. A survey of donkey breeds and management in five local ...

    African Journals Online (AJOL)

    Journal of Agriculture, Forestry and the Social Sciences ... In Nguru Local Government Area, 50% of the donkeys had no housing, 42% were housed in thatched roofs while 38% were housed under the shade compared to ... Donkey breeds, diseases and housing system differed significantly (p < 0.05) between the locations.

  13. Electricity market risk management using forward contracts with bilateral options

    International Nuclear Information System (INIS)

    Chung, T.S.; Yu, C.W.; Wong, K.P.; Zhang, S.H.

    2003-01-01

    Extreme short-term price volatility in competitive electricity markets creates the need for risk management arrangements. A new electricity forward contract with bilateral financial options is introduced, which allows both seller and buyer to take advantage of flexibility in generation and consumption to obtain monetary benefits while simultaneously removing the risk of market price fluctuations. The option theory is incorporated to formulate the contract price. The strike prices of options are derived from solving an equilibrium model in which both the buyer and the seller aim to maximise their own profit. Theoretical analysis shows that the proposed optional forward contract presents a more equitable and reasonable payoff structure that allows the buyer and seller to earn a larger overall expected benefit, and the contractual arrangement supports efficiency in economic dispatch of electricity production and consumption. The insights obtained from these results will be helpful to participants in the contractual decision-making process. (Author)

  14. A Contract That Manages Itself: The Time Has Arrived

    Science.gov (United States)

    2015-02-01

    technology inspires contracting. The Smart Contract The paradigm of a contract as a static document is about to change. The days of a contract being read...efficiency is of paramount importance in order for an organization to perform its mission. The Smart Contract as an Object In discussions about...the contract object ( smart contract ) exists, the contract will be able to interact with other objects. That will enable the contract to know how

  15. Atlantic salmon brood stock management and breeding handbook

    Science.gov (United States)

    Kincaid, Harold L.; Stanley, Jon G.

    1989-01-01

    Anadromus runs of Atlantic salmon have been restored to the Connecticut, Merrimack, Pawcatuck, Penobscot, and St. Croix rivers in New England by the stocking of more than 8 million smolts since 1948. Fish-breeding methods have been developed that minimize inbreeding and domestication and enhance natural selection. Methods are available to advance the maturation of brood stock, control the sex of production lots and store gametes. Current hatchery practices emphasize the use of sea-run brood stock trapped upon return to the rivers and a limited number of captive brood stock and rejuvenated kelts. Fish are allowed to mature naturally, after which they are spawned and incubated artificially. Generally, 1-year smolts are produced, and excess fish are stocked as fry in headwater streams. Smolts are stocked during periods of rising water in spring. Self-release pools are planned that enable smolts to choose the emigration time. Culturists keep good records that permit evaluation of the performance of strains and the effects of breeding practices. As Atlantic salmon populations expand, culturists must use sound breeding methods that enhance biotic potential while maintaining genetic diversity and protecting unique gene pools.

  16. Financial Management: Contracts Classified as Unreconcilable by the Defense Finance and Accounting Service Columbus (Contract No. F30602-81-C-0153)

    National Research Council Canada - National Science Library

    Granetto, Paul J; Kornides, James L; Issel, John K; Knight, Clarence E., III; Bennett, Karen M

    2005-01-01

    .... The Defense Contract Management Agency (DCMA) office in Orlando, Florida, administered the contract until October 7, 1985, when the responsibility for contract administration was transferred to the DCMA office in Palm Bay, Florida...

  17. Investment, regulation, and uncertainty: managing new plant breeding techniques.

    Science.gov (United States)

    Smyth, Stuart J; McDonald, Jillian; Falck-Zepeda, Jose

    2014-01-01

    As with any technological innovation, time refines the technology, improving upon the original version of the innovative product. The initial GM crops had single traits for either herbicide tolerance or insect resistance. Current varieties have both of these traits stacked together and in many cases other abiotic and biotic traits have also been stacked. This innovation requires investment. While this is relatively straight forward, certain conditions need to exist such that investments can be facilitated. The principle requirement for investment is that regulatory frameworks render consistent and timely decisions. If the certainty of regulatory outcomes weakens, the potential for changes in investment patterns increases.   This article provides a summary background to the leading plant breeding technologies that are either currently being used to develop new crop varieties or are in the pipeline to be applied to plant breeding within the next few years. Challenges for existing regulatory systems are highlighted. Utilizing an option value approach from investment literature, an assessment of uncertainty regarding the regulatory approval for these varying techniques is undertaken. This research highlights which technology development options have the greatest degree of uncertainty and hence, which ones might be expected to see an investment decline.

  18. Defense Contract Management: DOD's Lack of Adherence to Key Contracting Principles on Iraq Oil Contract Put Government Interests at Risk

    National Research Council Canada - National Science Library

    Hutton, John P; Ahearn, Marie; Augustine, Penny B; Campbell, Greg; James, Jr., Arthur; Lesonsky, Eric; Lord, Stephen; McDonough-Hughes, Anne; McKelvey, Janet; Patton, Kenneth

    2007-01-01

    .... The contract was also used to ensure adequate fuel supplies inside Iraq. RIO I was a cost-plus-award-fee type contract that provided for payment of the contractor's costs, a fixed fee determined at inception of the contract, and a potential award fee...

  19. Contract Management of LHC Civil Engineering at Point 5

    CERN Document Server

    Osborne, J A

    1999-01-01

    Civil engineering work commenced in August 1998 at LEP Point 5 for the underground and surface works necessary to accommodate the CMS detector for the LHC project. The principal underground works consist of two parallel caverns, separated by a support pillar, two new shafts, a number of smaller connection and service galleries and tunnel enlargements on the existing LEP tunnel. The surface works consist of the 140 m long SX building for the detector assembly and numerous other steel and concrete structures necessary for the installation and operation of CMS. The civil engineering design and supervision has been awarded to a joint venture of Gibb (UK), SGI (Switzerland) and Geoconsult (Austria), and the contracting to a joint venture of Dragados (Spain) and Seli (Italy) for 112 MCHF. The aim of this paper is to discuss the management of this contract and in particular how the various parties interact in order to work most efficiently.

  20. 77 FR 12925 - Federal Acquisition Regulation; Proper Use and Management of Cost-Reimbursement Contracts

    Science.gov (United States)

    2012-03-02

    ...-Reimbursement Contracts AGENCIES: Department of Defense (DoD), General Services Administration (GSA), and... addresses the use and management of cost- reimbursement contracts. DATES: Effective Date: April 2, 2012 FOR...-reimbursement contracts in the following three areas: 1. Circumstances when cost-reimbursement contracts are...

  1. Managing the relational character of public-private partnership contracts

    OpenAIRE

    Cvetković, Predrag

    2015-01-01

    A public-private partnership contract has the character of a relational contract. Relational contracts are incomplete agreements governing transactions where the contracting parties have mutually agreed that it is impossible or economically inefficient to contractually define ex ante possible difficulties and contingencies in the contract implementation, nor the difficulties and contingencies underlying the ex post control of contract performance by a third entity (court or arbitration). Cons...

  2. Government Health Care Contract Incentives: Making Managed Health Care Work in Federal Government Procurements

    National Research Council Canada - National Science Library

    Teskey, Mark S

    1999-01-01

    Contracting for managed health care systems is a complex undertaking. The current TRICARE contracts captured all the important parts of the system and ensured detailed compliance with the many system requirements...

  3. Managing the training process: contracting for training services

    International Nuclear Information System (INIS)

    Carlson, E.R.

    1985-01-01

    The need for using consultants and contracting for training services should be based on one or more of these three major reasons: the need to expand capability on a crash basis, the need for specialized expertise, and the need for objectivity, and independence. When the need for using a consultant exists, the training manager must first define the scope of work or services the consultant is to provide and how the consultant will interface with the training staff. The next step will be to develop a Request for Proposal which involves management, training staff, and contract services organizations. The critical parts of an RFP are scope and schedule. Consideration would be given to determining which consultant organizations should receive the RFP, and specifying who is on the bidders list. The third step will consist of evaluating the proposals and awarding the work. This step needs to be objective, defendable, and repeatable. The final phase will be the performance of the work. The activities included are project initiation, monitoring contractor performance, and formal conclusion

  4. Managing the risks associated with natural gas purchase contracts

    International Nuclear Information System (INIS)

    Brett, T.

    2003-01-01

    This presentation described different styles of gas contracts. When markets opened in 1986, many contracts were between end users and producers, and a few marketers. Typically, contracts were for a fixed price and term. In 1990, when gas futures contracts began trading on NYMEX, contracts began to have floating prices, and prices linked to NYMEX prices. Standard gas contracts were developed in the mid-late 1990s. This paper described the differences between plain retail gas contracts, retail gas contracts between mass marketers and end users, wholesale contracts, contracts between producers and marketers, transportation contracts and domestic contracts. Both contracting parties obtain business and legal advice from consultants and lawyers with knowledge in energy transactions. Master agreement contracts were also described with reference to the Gas EDI contract. Examples of changing regulatory requirements were also outlined along with some traps to avoid. Bundled transportation agreements are standard documents that can be negotiated in special circumstances to charge customers who fail to deliver. They should be considered as tariffs

  5. R and D contract management systems in the USA; Beikoku ni okeru R and D contract kanri system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    Outlined herein are the US Government's R and D contract management, which is considered to have greatly contributed to promotion of innovation in the USA. The procedures for the R and D contracts are managed through the mechanisms of the (government procurement), following the FAR (Federal Acquisition Regulations) that govern the government procurement rules. The procedural flow includes planning, public announcement of inviting the application documents, examination of the applications, negotiations, granting the fund, project management, suspension of the project and completion of the project. The audition sometimes takes several years to complete. The staff managing the individual contract is fairly specialized, and a team consisting of several professionals is responsible for each project. The substantial lifetime training systems the contract officers can receive are established. The alternative contract system encourages the applications from consortiums, and private enterprises frequently tie up with academic organizations to apply for the funds. Granting the funds to consortiums have many advantages, e.g., cost sharing and technological transfer. (NEDO)

  6. Best in Class Project Management and Contract Management Initiative at the Department of Energy's Office of Environmental Management

    International Nuclear Information System (INIS)

    Van Camp, S.G.; Stevenson, J.S.; Deiters, M.G.

    2009-01-01

    Since its founding in 1989, the U.S. Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. To address this issue, EM has developed a vision for building a 'Best in Class' Project Management and Contract Management (BICPM) organization. To develop the strategy and implement the process to accomplish this vision, EM contracted with the U.S. Army Corps of Engineers (USACE) and their support contractors. EM and the USACE Team developed a five-phased approach to implement the BICPM Initiative: (I) develop assessment criteria, (II) assess existing project and contract management capabilities, (III) develop an implementation plan, (IV) implement corrective actions, and (V) institutionalize BICPM. Under Phases I and II, the USACE Team assessed the status of project and contract management capabilities at 16 EM offices. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and benchmarks and three contract management benchmarks. Under Phase III, EM and the USACE Team developed the Corporate Implementation Plan which identified the key challenges and provided a road-map to address these challenges and to implement BICPM. These challenges included: Federal staffing shortages; integration of project and contract management; further development of project-oriented culture; project baseline maintenance; consistent implementation of the DOE order for project management, 413.3A; and role of EM Headquarters in BICPM. The shortage of qualified resources dedicated to supporting Federal project and contract management functions was identified as a primary cause for project and contract management difficulties within EM. The Corporate Implementation Plan outlined a set of 18 specific Recommended Priority

  7. Management of Contracts for F110 Engine Procurements

    National Research Council Canada - National Science Library

    Granetto, Paul

    2001-01-01

    This audit was performed in response to an allegation to the Defense Hotline that the Wright-Patterson Air Force Base Procurement Contracting Office made poor procurement decisions on F110 aircraft engine contracts...

  8. Differences in Services and Fees for Management and Administration of Iraq Reconstruction Contracts

    National Research Council Canada - National Science Library

    Warren, David; Childress, David; Salvatierra, George; Thompson, Chuck; Williams, Roger M

    2008-01-01

    ...), a field operating agency of the Air Force Civil Engineer, are two primary organizations providing project management and contract administration services for major Iraq reconstruction projects...

  9. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management

    International Nuclear Information System (INIS)

    Lesko, K.F.; Berriochoa, M.V.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, 'Management of Construction Projects, A Constructor's Perspective', University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted

  10. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  11. Traditional llama husbandry and breeding management in the Ayopaya region, Bolivia.

    Science.gov (United States)

    Markemann, A; Valle Zárate, A

    2010-01-01

    The llama claims the largest population of the domestic South American camelids, most of which are raised in Bolivia. More than 53,000 rural families are dedicated to llama husbandry as part of their livelihood strategy. Contemporary Andean societies deliberately select animals for specific traits and employ substantial livestock management to secure subsistence. This study presents traditional llama husbandry and breeding management activities in the Ayopaya region, Bolivia. Traditional selection traits for male and female llamas are documented and assessed by a ranking and a ratio-scaled evaluation. Husbandry and management parameters are in concordance with other studies conducted in the region, but show a high variation. Average llama herd sizes are rather small (mu = 45.6). In some herds, breeding males are utilized for a long time and mix with other herds, causing concerns about inbreeding. Preferred trait groups for llama males according to farmers' responses were body conformation, fibre, testicle conformation, fleece colour and height at withers. Traditional selection criteria generally relate to the phenotype, but also include the commercially interesting fibre trait. The presented results should be considered in breeding and management programmes for the respective llama population to ensure sustainable use of this genetically and culturally valuable resource.

  12. Genetic variability of six French meat sheep breeds in relation to their genetic management.

    Science.gov (United States)

    Huby, Marie; Griffon, Laurent; Moureaux, Sophie; De Rochambeau, Hubert; Danchin-Burge, Coralie; Verrier, Etienne

    2003-01-01

    Some demographic parameters, the genetic structure and the evolution of the genetic variability of six French meat sheep breeds were analysed in relation with their management. Four of these breeds are submitted to more or less intense selection: the Berrichon du Cher (BCH), Blanc du Massif Central (BMC), Charollais (CHA) and Limousin (LIM); the other two breeds are under conservation: the Roussin de La Hague (RLH) and Solognot (SOL). Genealogical data of the recorded animals born from 1970 to 2000 and of their known ancestors were used. The most balanced contributions of the different flocks to the sire-daughter path was found in the SOL. In the BCH, a single flock provided 43% of the sire-AI sire path, whereas the contributions of the flocks were more balanced in the BMC and LIM (the only other breeds where AI is used to a substantial amount). The distribution of the expected genetic contribution of the founder animals was found to be unbalanced, especially in the BCH and LIM. The effective numbers of ancestors (founders or not) for the ewes born from 1996 to 2000 were equal to 35 (BCH), 144 (BMC), 112 (CHA), 69 (LIM), 40 (RLH) and 49 (SOL). Inbreeding was not analysed in the BMC, due to incomplete pedigree information. From 1980 on, the rates of inbreeding, in percentage points per year, were +0.112 (BCH), +0.045 (CHA), +0.036 (LIM), +0.098 (RLH) and +0.062 (SOL). The implications of the observed trends on genetic variability are discussed in relation to the genetic management of each breed. The need for a larger selection basis in the BCH, the efficiency of the rules applied in the SOL to preserve the genetic variability and the need for a more collective organisation in the CHA and RLH are outlined.

  13. Genetic variability of six French meat sheep breeds in relation to their genetic management

    Directory of Open Access Journals (Sweden)

    Coralie Danchin-Burge

    2003-11-01

    Full Text Available Abstract Some demographic parameters, the genetic structure and the evolution of the genetic variability of six French meat sheep breeds were analysed in relation with their management. Four of these breeds are submitted to more or less intense selection: the Berrichon du Cher (BCH, Blanc du Massif Central (BMC, Charollais (CHA and Limousin (LIM; the other two breeds are under conservation: the Roussin de La Hague (RLH and Solognot (SOL. Genealogical data of the recorded animals born from 1970 to 2000 and of their known ancestors were used. The most balanced contributions of the different flocks to the sire-daughter path was found in the SOL. In the BCH, a single flock provided 43% of the sire-AI sire path, whereas the contributions of the flocks were more balanced in the BMC and LIM (the only other breeds where AI is used to a substantial amount. The distribution of the expected genetic contribution of the founder animals was found to be unbalanced, especially in the BCH and LIM. The effective numbers of ancestors (founders or not for the ewes born from 1996 to 2000 were equal to 35 (BCH, 144 (BMC, 112 (CHA, 69 (LIM, 40 (RLH and 49 (SOL. Inbreeding was not analysed in the BMC, due to incomplete pedigree information. From 1980 on, the rates of inbreeding, in percentage points per year, were +0.112 (BCH, +0.045 (CHA, +0.036 (LIM, +0.098 (RLH and +0.062 (SOL. The implications of the observed trends on genetic variability are discussed in relation to the genetic management of each breed. The need for a larger selection basis in the BCH, the efficiency of the rules applied in the SOL to preserve the genetic variability and the need for a more collective organisation in the CHA and RLH are outlined.

  14. Initial insights on the performances and management of dairy cattle herds combining two breeds with contrasting features.

    Science.gov (United States)

    Magne, M A; Thénard, V; Mihout, S

    2016-05-01

    Finding ways of increasing animal production with low external inputs and without compromising reproductive performances is a key issue of livestock systems sustainability. One way is to take advantage of the diversity and interactions among components within livestock systems. Among studies that investigate the influence of differences in animals' individual abilities in a herd, few focus on combinations of cow breeds with contrasting features in dairy cattle herds. This study aimed to analyse the performances and management of such multi-breed dairy cattle herds. These herds were composed of two types of dairy breeds: 'specialist' (Holstein) and 'generalist' (e.g. Montbeliarde, Simmental, etc.). Based on recorded milk data in southern French region, we performed (i) to compare the performances of dairy herds according to breed-type composition: multi-breed, single specialist breed or single generalist breed and (ii) to test the difference of milk performances of specialist and generalist breed cows (n = 10 682) per multi-breed dairy herd within a sample of 22 farms. The sampled farmers were also interviewed to characterise herd management through multivariate analysis. Multi-breed dairy herds had a better trade-off among milk yield, milk fat and protein contents, herd reproduction and concentrate-conversion efficiency than single-breed herds. Conversely, they did not offer advantages in terms of milk prices and udder health. Compared to specialist dairy herds, they produce less milk with the same concentrate-conversion efficiency but have better reproductive performances. Compared to generalist dairy herds, they produce more milk with better concentrate-conversion efficiency but have worse reproductive performances. Within herds, specialist and generalist breed cows significantly differed in milk performances, showing their complementarity. The former produced more milk for a longer lactation length while the latter produced milk with higher protein and fat

  15. Contract Audit Followup: Defense Contract Management Agency Santa Ana Office's Actions on Incurred Cost Audits

    National Research Council Canada - National Science Library

    2005-01-01

    This report addresses the DCMA Santa Ana District Office. DoD Directive 7640.2, "Policy for Follow-up on Contract Audit Reports," February 12, 1988, as amended August 16, 1995, implements OMB Circular A-50...

  16. Financial Management: Reopening of Contracts in the Mechanization of Contract Administration Services System

    National Research Council Canada - National Science Library

    Granetto, Paul

    2003-01-01

    The Defense Finance and Accounting Service planned to replace the payment and entitlement function performed by the Mechanization of Contract Administration Services system with a new or modified system...

  17. MANAGING ENGINEERING ACTIVITIES FOR THE PLATEAU REMEDIATION CONTRACT - HANFORD

    Energy Technology Data Exchange (ETDEWEB)

    KRONVALL CM

    2011-01-14

    In 2008, the primary Hanford clean-up contract transitioned to the CH2MHill Plateau Remediation Company (CHPRC). Prior to transition, Engineering resources assigned to remediation/Decontamination and Decommissioning (D&D) activities were a part of a centralized engineering organization and matrixed to the performing projects. Following transition, these resources were reassigned directly to the performing project, with a loose matrix through a smaller Central Engineering (CE) organization. The smaller (10 FTE) central organization has retained responsibility for the overall technical quality of engineering for the CHPRC, but no longer performs staffing and personnel functions. As the organization has matured, there are lessons learned that can be shared with other organizations going through or contemplating performing a similar change. Benefits that have been seen from the CHPRC CE organization structure include the following: (1) Staff are closely aligned with the 'Project/facility' that they are assigned to support; (2) Engineering priorities are managed to be consistent with the 'Project/facility' priorities; (3) Individual Engineering managers are accountable for identifying staffing needs and the filling of staffing positions; (4) Budget priorities are managed within the local organization structure; (5) Rather than being considered a 'functional' organization, engineering is considered a part of a line, direct funded organization; (6) The central engineering organization is able to provide 'overview' activities and maintain independence from the engineering organizations in the field; and (7) The central engineering organization is able to maintain a stable of specialized experts that are able to provide independent reviews of field projects and day-to-day activities.

  18. MANAGING ENGINEERING ACTIVITIES FOR THE PLATEAU REMEDIATION CONTRACT - HANFORD

    International Nuclear Information System (INIS)

    Kronvall, C.M.

    2011-01-01

    In 2008, the primary Hanford clean-up contract transitioned to the CH2MHill Plateau Remediation Company (CHPRC). Prior to transition, Engineering resources assigned to remediation/Decontamination and Decommissioning (D and D) activities were a part of a centralized engineering organization and matrixed to the performing projects. Following transition, these resources were reassigned directly to the performing project, with a loose matrix through a smaller Central Engineering (CE) organization. The smaller (10 FTE) central organization has retained responsibility for the overall technical quality of engineering for the CHPRC, but no longer performs staffing and personnel functions. As the organization has matured, there are lessons learned that can be shared with other organizations going through or contemplating performing a similar change. Benefits that have been seen from the CHPRC CE organization structure include the following: (1) Staff are closely aligned with the 'Project/facility' that they are assigned to support; (2) Engineering priorities are managed to be consistent with the 'Project/facility' priorities; (3) Individual Engineering managers are accountable for identifying staffing needs and the filling of staffing positions; (4) Budget priorities are managed within the local organization structure; (5) Rather than being considered a 'functional' organization, engineering is considered a part of a line, direct funded organization; (6) The central engineering organization is able to provide 'overview' activities and maintain independence from the engineering organizations in the field; and (7) The central engineering organization is able to maintain a stable of specialized experts that are able to provide independent reviews of field projects and day-to-day activities.

  19. Academic Health Systems Management: The Rationale Behind Capitated Contracts

    Science.gov (United States)

    Taheri, Paul A.; Butz, David A.; Greenfield, Lazar J.

    2000-01-01

    Objective To determine why hospitals enter into “capitated” contracts, which often generate accounting losses. The authors’ hypothesis is that hospitals coordinate contracts to keep beds full and that in principal, capitated contracts reflect sound capacity management. Summary Background Data In high-overhead industries, different consumers pay different prices for similar services (e.g., full-fare vs. advanced-purchase plane tickets, full tuition vs. financial aid). Some consumers gain access by paying less than total cost. Hospitals, like other high-overhead business enterprises, must optimize the use of their capacity, amortizing overhead over as many patients as possible. This necessity for enhanced throughput forces hospitals and health systems to discount empty beds, sometimes to the point where they incur accounting losses serving some payors. Methods The authors analyzed the cost accounting system at their university teaching hospital to compare hospital and intensive care unit (ICU) lengths of stay (LOS), variable direct costs (VDC), overhead of capitated patients, and reimbursement versus other payors for all hospital discharges (n = 29,036) in fiscal year 1998. The data were analyzed by diagnosis-related groups (DRGs), length of stay (LOS), insurance carrier, proximity to hospital, and discharge disposition. Patients were then distinguished across payor categories based on their resource utilization, proximity to the hospital, DRG, LOS, and discharge status. Results The mean cost for capitated patients was $4,887, less than half of the mean cost of $10,394 for the entire hospitalized population. The mean capitated reimbursement was $928/day, exceeding the mean daily VDC of $616 but not the total cost of $1,445/day. Moreover, the mean total cost per patient day of treating a capitated patient was $400 less than the mean total cost per day for noncapitated patients. The hospital’s capitated health maintenance organization (HMO) patients made up 16

  20. Academic health systems management: the rationale behind capitated contracts.

    Science.gov (United States)

    Taheri, P A; Butz, D A; Greenfield, L J

    2000-06-01

    To determine why hospitals enter into "capitated" contracts, which often generate accounting losses. The authors' hypothesis is that hospitals coordinate contracts to keep beds full and that in principal, capitated contracts reflect sound capacity management. In high-overhead industries, different consumers pay different prices for similar services (e.g., full-fare vs. advanced-purchase plane tickets, full tuition vs. financial aid). Some consumers gain access by paying less than total cost. Hospitals, like other high-overhead business enterprises, must optimize the use of their capacity, amortizing overhead over as many patients as possible. This necessity for enhanced throughput forces hospitals and health systems to discount empty beds, sometimes to the point where they incur accounting losses serving some payors. The authors analyzed the cost accounting system at their university teaching hospital to compare hospital and intensive care unit (ICU) lengths of stay (LOS), variable direct costs (VDC), overhead of capitated patients, and reimbursement versus other payors for all hospital discharges (n = 29,036) in fiscal year 1998. The data were analyzed by diagnosis-related groups (DRGs), length of stay (LOS), insurance carrier, proximity to hospital, and discharge disposition. Patients were then distinguished across payor categories based on their resource utilization, proximity to the hospital, DRG, LOS, and discharge status. The mean cost for capitated patients was $4,887, less than half of the mean cost of $10,394 for the entire hospitalized population. The mean capitated reimbursement was $928/day, exceeding the mean daily VDC of $616 but not the total cost of $1,445/day. Moreover, the mean total cost per patient day of treating a capitated patient was $400 less than the mean total cost per day for noncapitated patients. The hospital's capitated health maintenance organization (HMO) patients made up 16. 0% of the total admissions but only 9.4% of the total

  1. Workup and management of patients with frequent premature ventricular contractions.

    Science.gov (United States)

    Giles, Katie; Green, Martin S

    2013-11-01

    Premature ventricular contractions (PVCs) are a frequently encountered entity in clinical cardiology. They rarely affect prognosis or management. However, they might produce bothersome symptoms and, in select individuals with a high PVC burden, they might contribute to left ventricular (LV) dysfunction. Workup of patients with very frequent PVCs consists of a thorough history and physical examination to screen for underlying cardiac disease and potential triggers. Routine investigations include a standard 12-lead electrocardiogram, as well as an echocardiogram. A Holter monitor should be performed in those with severe symptoms, a history of syncope, or a malignant family history. Exercise stress testing has a role in evaluating for ischemia and in the assessment of patients with exertional symptoms. More advanced testing is not warranted if these initial investigations are reassuring. Referral to an arrhythmia specialist should be considered in patients with LV dysfunction whose PVC burden exceeds 15%. Frequent ventricular ectopy represents a rare, but reversible cause of LV dysfunction and these patients should be further evaluated for possible catheter ablation. Copyright © 2013 Canadian Cardiovascular Society. Published by Elsevier Inc. All rights reserved.

  2. 48 CFR 237.102-72 - Contracts for management services.

    Science.gov (United States)

    2010-10-01

    ... development or production of the major system ensures that Federal employees are responsible for determining— (1) Courses of action to be taken in the best interest of the Government; and (2) Best technical performance for the warfighter; and (c) The contract requires that the prime contractor for the contract may...

  3. Enhancing the diversity of breeding invertebrates within field margins of intensively managed grassland: Effects of alternative management practices.

    Science.gov (United States)

    Fritch, Rochelle A; Sheridan, Helen; Finn, John A; McCormack, Stephen; Ó hUallacháin, Daire

    2017-11-01

    Severe declines in biodiversity have been well documented for many taxonomic groups due to intensification of agricultural practices. Establishment and appropriate management of arable field margins can improve the diversity and abundance of invertebrate groups; however, there is much less research on field margins within grassland systems. Three grassland field margin treatments (fencing off the existing vegetation "fenced"; fencing with rotavation and natural regeneration "rotavated" and; fencing with rotavation and seeding "seeded") were compared to a grazed control in the adjacent intensively managed pasture. Invertebrates were sampled using emergence traps to investigate species breeding and overwintering within the margins. Using a manipulation experiment, we tested whether the removal of grazing pressure and nutrient inputs would increase the abundance and richness of breeding invertebrates within grassland field margins. We also tested whether field margin establishment treatments, with their different vegetation communities, would change the abundance and richness of breeding invertebrates in the field margins. Exclusion of grazing and nutrient inputs led to increased abundance and richness in nearly all invertebrate groups that we sampled. However, there were more complex effects of field margin establishment treatment on the abundance and richness of invertebrate taxa. Each of the three establishment treatments supported a distinct invertebrate community. The removal of grazing from grassland field margins provided a greater range of overwintering/breeding habitat for invertebrates. We demonstrate the capacity of field margin establishment to increase the abundance and richness in nearly all invertebrate groups in study plots that were located on previously more depauperate areas of intensively managed grassland. These results from grassland field margins provide evidence to support practical actions that can inform Greening (Pillar 1) and agri

  4. Individually variable energy management during egg production is repeatable across breeding attempts.

    Science.gov (United States)

    Williams, Tony D; Vézina, François; Speakman, John R

    2009-04-01

    It is axiomatic that whole-animal metabolism, measured for example as daily energy expenditure (DEE), plays a central role in determining reproductive success and survival (fitness) in all organisms. Nevertheless, strong evidence for consistent systematic relationships between DEE and either individual traits (age, sex, body size), environmental factors (e.g. food availability, temperature) or 'fitness' traits (e.g. number of offspring, survival) remains far from compelling in birds and mammals. Recently, we suggested that female birds might utilise complex, individually variable energy management strategies to meet the metabolic demands of reproduction, generating a wide spectrum of effects on reproductive DEE, from overcompensation (net decrease in DEE) to additive effects (net increase in DEE). Here we show that this individually variable adjustment or 'plasticity' in energy expenditure associated with egg production is repeatable among individuals between successive breeding attempts in female zebra finches (Taeniopygia guttata). Our study highlights the importance (a) of measuring 'plasticity' or change associated with transitions of physiological state (e.g. non-breeding to breeding) based on multiple measurements of the same individual, and (b) of extending consideration of how selection might drive the evolution of phenotypic plasticity per se to include physiological and metabolic traits.

  5. An Analysis of Internal Controls for DoD Contract Management

    Science.gov (United States)

    2015-12-01

    alternative control activities to reduce the risk of fraud ( COSO , 2013; GAO, 2014). Also, the Office of Management and Budget (OMB), which contains an...force. Since 1992, the Government Accountability Office (GAO) has identified contract management within the DOD as an area for high risk in fraud...force. Since 1992, the Government Accountability Office (GAO) has identified contract management within the DOD as an area for high risk in fraud

  6. Complexity, Contract Design and Incentive Design in the Construction Management Industry

    OpenAIRE

    Beg, Zeshawn Afsari

    2015-01-01

    In this paper I examine how one construction management company uses contract design and incentive design to respond to aspects of task complexity and relationship complexity present in its construction projects. In terms of contract design, I find that the company is unable to increase its use of cost-plus pricing when faced with technically complex projects. Instead, the company uses increased pre-execution design modification and price markups when technically complex projects are contract...

  7. Conceptual ecological model for management of breeding shrubland birds in the Mid-Atlantic Region

    Science.gov (United States)

    Peterjohn, Bruce G.

    2006-01-01

    While grassland birds have become the focus of increased conservation activities, the status of birds occupying shrubland habitats has received relatively little attention (Hunter et al. 2001). Yet, in eastern North America, shrubland birds exhibited consistent population declines during the past 40 years, based on data from the North American Breeding Bird Survey (Pardieck and Sauer 2001). These population declines primarily reflect large-scale changes in land use patterns during the previous century (Lorimer 2001). Large areas of marginal farmland were abandoned and underwent secondary succession during the first half of the twentieth century, producing abundant successional habitats favored by shrubland birds. As these habitats matured, combined with strict fire-suppression policies (Hunter et al. 2001), shrublands succeeded into mature forests, and shrubland bird communities were replaced by woodland birds (Irland 1982; Askins 1993). For example, while nearly 29% of New England forests were classified as sapling stage in 1950, only 8% remained at that stage in the 1980s (Askins 1993). The trend towards forest maturation and loss of shrubland habitats continues, yet concerted conservation activities have not been directed to benefit declining shrubland bird populations. The National Park Service (NPS) could contribute to shrubland bird conservation in the Mid- Atlantic Region. The NPS maintains a number of historic sites and former battlefields managed for their cultural significance but also support wildlife populations. Many of these “cultural parks” maintain open landscapes, recreating land use patterns existing at the times of the historical events. While these open landscapes are frequently managed grasslands, some parks also support successional habitats that could be managed to benefit shrubland birds. In 2005, the NPS initiated a project exploring the potential of “cultural parks” to support significant breeding grassland and shrubland bird

  8. Contracts and management services site support program plan WBS 6.10.14

    Energy Technology Data Exchange (ETDEWEB)

    Knoll, J.M. Jr.

    1994-09-01

    Contracts and Management Services is recognized as the central focal point for programs having company or sitewide application in pursuit of the Hanford Missions`s financial and operational objectives. Contracts and Management Services actively pursues cost savings and operational efficiencies through: Management Standards by ensuring all employees have an accessible, integrated system of clear, complete, accurate, timely, and useful management control policies and procedures; Contract Reform by restructuring the contract, organization, and cost accounting systems to refocus Hanford contract activities on output products; Systems and Operations Evaluation by directing the Cost Reduction program, Great Ideas, and Span of Management activities; Program Administration by enforcing conditions of Accountability (whether DEAR-based or FAR-based) for WHC, BCSR, ICF KH, and BHI; Contract Performance activities; chairing the WHC Cost Reduction Review Board; and analyzing companywide Performance Measures; Data Standards and Administration by establishing and directing the company data management program; giving direction to the major RL programs and mission areas for implementation of cost-effective and efficient data management practices; directing all operations, application, and interfaces contained within the Hanford PeopleCore System; directing accomplishment and delivery of TPA data management milestones; and directing the sitewide data management processes for Data Standards and the Data Directory.

  9. Psychological contracts and commitment amongst nurses and nurse managers: a discourse analysis.

    Science.gov (United States)

    McCabe, T J; Sambrook, Sally

    2013-07-01

    Few studies explore the link between the psychological contracts and the commitment of nursing professionals in the healthcare sector, and how perceived breaches of the psychological contract can impact on nurses' commitment levels. This study explores the connections between the psychological contracts and organisational and professional commitment of nurses and nurse managers. Semi-structured interviews were conducted with nurses and nurse managers, to explore the connections between their psychological contracts and organisational and professional commitment. Large acute and small community organisation within the British National Health Service. 28 nurses and 11 nurse managers working within an acute and a community sector organisation - 20 and 19 in each organisation. Participants were selected through a process of purposive sampling, reflecting variations in terms of age, grade, ward and tenure. A discourse analysis was conducted on the qualitative data from the thirty nine semi-structured interviews. Two overall themes emerged, professional and managerial values. Professional values included the sub-themes: professional recognition; immediate work environment - leadership and peer support; professional development and progression. Sub-themes under managerial values included: involvement; general management; resource management. The findings suggest that nurses and nurse managers are governed by relational psychological contracts, underpinned by an affective and to a lesser extent normative commitment towards the nursing profession. They emphasise 'professional values', and professional commitment, as the basis for positive psychological contracts amongst nursing professionals. There was anecdotal evidence of relational psychological contract breach, with decreasing job satisfaction as the outcome of perceived psychological contract breach. Positive psychological contracts and commitment levels amongst nursing professionals can be supported by managers been

  10. Impacts of Nutrition and Feeding Programs on Farmers’ Management Decisions Affecting the Success of Dairy Farms with Culture Breed Cattle

    OpenAIRE

    Yavuz Topcu; Mehmet Toparlak; Muhlis Macit

    2016-01-01

    The aim of the study is to evaluate all the factors determining the milk production and yield decisions with regard to the nutrition and feeding programs affecting the integrated management strategies on the success of the dairy farms with culture breed cattle under the pasture-based and indoor barn-based production systems. For these aims, data obtained from the individual interviews conducted at the dairy farms with 100 culture breed cattle were used for Principal Component and Multiple Reg...

  11. Performance Contracting as a Performance Management Tool in the Public Sector in Kenya: Lessons of learning

    Science.gov (United States)

    Hope, Kempe Ronald, Sr.

    2013-01-01

    The purpose of this article is to provide an assessment and analysis of public sector performance contracting as a performance management tool in Kenya. It aims to demonstrate that performance contracting remains a viable and important tool for improving public sector performance as a key element of the on-going public sector transformation…

  12. 76 FR 14543 - Federal Acquisition Regulation; Proper Use and Management of Cost-Reimbursement Contracts

    Science.gov (United States)

    2011-03-16

    ..., Sequence 1] RIN 9000-AL78 Federal Acquisition Regulation; Proper Use and Management of Cost-Reimbursement... other than firm-fixed-price contracts (e.g., cost-reimbursement, time-and-material, and labor-hour...-reimbursement contracts and identifies the following three areas that the Defense Acquisition Regulation Council...

  13. 25 CFR 533.3 - Submission of management contract for approval.

    Science.gov (United States)

    2010-04-01

    ...) For new contracts and new operations, a three (3)-year business plan which sets forth the parties... operations, a three (3)-year business plan which sets forth the parties' goals, objectives, budgets... 25 Indians 2 2010-04-01 2010-04-01 false Submission of management contract for approval. 533.3...

  14. The politics of establishing catchment management agencies in South Africa: the case of the Breede-Overberg Catchment Management Agency

    Directory of Open Access Journals (Sweden)

    Richard Meissner

    2016-09-01

    Full Text Available We reflect on the politics of establishing catchment management agencies in South Africa with a specific focus on the Breede-Overberg Catchment Management Agency (BOCMA, which was recently replaced by the Breede-Gouritz Catchment Management Agency (BGCMA. We do so by applying the framework of adaptive comanagement and its institutional prescriptions: collaboration, experimentation, and a bioregional approach. We start by introducing the history of this catchment management agency (CMA and then describe the establishment of CMAs in South Africa in general and that of BOCMA in particular. We follow the framework for rule types and types of river basin organizations set out by the editors of this special feature with reference to adaptive comanagement where applicable. We then discuss the politics and strategies involved in the introduction of the CMA concept to the National Water Act and the latest developments around these institutions in South Africa. This is followed by reflections on what can be surmised about BOCMA's democratic functioning and performance to date. We conclude by reflecting on the future of operations of the new BGCMA and CMAs in South Africa in general. While our research shows that BOCMA's establishment process has featured several elements of adaptive comanagement and its institutional prescriptions, it remains to be seen to what extent it is possible to continue implementing this concept when further developing and operationalizing the BGCMA and the country's other CMAs.

  15. Assessing Contract Management Maturity: U.S. Army Joint Munitions and Lethality Contracting Center, Army Contracting Command, Picatinny Arsenal

    Science.gov (United States)

    2009-09-01

    demonstrate competence” ( Jones , 2006). Most organizations conduct performance management for their employees with actions such as, setting goals...take the 14 form of comprehensive questionnaires, SWOT analyses or diagnostic models and include a comparison of results to various best practices...procnet.pica.army.mil/ Jones , R. (2006). CIDA Organizational Assessment Guide. Retrieved on March 1, 2009 from: http://www.acdi-cida.gc.ca/CIDAWEB

  16. Managing phenol contents in crop plants by phytochemical farming and breeding-visions and constraints.

    Science.gov (United States)

    Treutter, Dieter

    2010-03-02

    Two main fields of interest form the background of actual demand for optimized levels of phenolic compounds in crop plants. These are human health and plant resistance to pathogens and to biotic and abiotic stress factors. A survey of agricultural technologies influencing the biosynthesis and accumulation of phenolic compounds in crop plants is presented, including observations on the effects of light, temperature, mineral nutrition, water management, grafting, elevated atmospheric CO(2), growth and differentiation of the plant and application of elicitors, stimulating agents and plant activators. The underlying mechanisms are discussed with respect to carbohydrate availability, trade-offs to competing demands as well as to regulatory elements. Outlines are given for genetic engineering and plant breeding. Constraints and possible physiological feedbacks are considered for successful and sustainable application of agricultural techniques with respect to management of plant phenol profiles and concentrations.

  17. Trust-based or performance-based management: a study of employment contracting in hospitals.

    Science.gov (United States)

    Pettersen, Inger Johanne

    2011-01-01

    Hospitals are frequently changing managerial practices due to numerous public sector reforms taking place. In general, these reforms include the making and monitoring of contracts that regulate relations between the hospitals and their professional staffs. The aim of this paper is to discuss some main characteristics of the contracts that regulate the perceived relations between physicians as employees and the public hospital as employer. The theoretical framework is based on a contract theory approach. The empirical data is based on survey data from full-time employed physicians in the medical and surgical divisions in one of the largest university hospitals in Norway. This study shows that perceived obligations and psychological contracts indicate high degree of relational contracts between the hospital and the physicians. These socio-cultural elements should be recognized as important mechanisms of coordination and communication when policy makers and hospital managers are designing hospital management control systems. Copyright © 2009 John Wiley & Sons, Ltd.

  18. Behavioural changes experienced by contract managers while working on remote project sites

    OpenAIRE

    2012-01-01

    M.B.A. This research project is concerned with the behavioural changes of contract managers while working on 'remote' project sites. While working on such a project, the researcher became aware that the behaviour of certain contract managers changed over the course of the project, and that this behaviour was not the same as they demonstrated when at home or in the office environment. In many instances these behavioural changes were of a negative nature, the consequences of which often resu...

  19. Upland Nesting Prairie Shorebirds: Use of Managed Wetland Basins and Accuracy of Breeding Surveys

    Directory of Open Access Journals (Sweden)

    Cheri L. Gratto-Trevor

    2006-06-01

    Full Text Available Wetlands in southern Alberta are often managed to benefit waterfowl and cattle production. Effects on other species usually are not examined. I determined the effect of managed wetlands on upland-nesting shorebirds in southern Alberta by comparing numbers of breeding willets (Catoptrophorus semipalmatus, marbled godwits (Limosa fedoa, and long-billed curlews (Numenius americanus among areas of managed wetlands, natural wetland basins, and no wetland basins from 1995 to 2000. Surveys were carried out at 21 sites three times each year. Nine to ten of these areas (each 2 km2 were searched for nests annually from 1998-2000. Numbers of willets and marbled godwits and their nests were always highest in areas with managed wetlands, probably because almost all natural wetland basins were dry in this region in most years. Densities of willets seen during pre-incubation surveys averaged 2.3 birds/km2 in areas of managed wetlands, 0.4 in areas of natural wetland basins, and 0.1 in areas with no wetland basins. Nest densities of willets (one search each season averaged 1.5, 0.9, and 0.3 nests/km2 in areas of managed, natural, and no wetland basins, respectively. Similarly, pre-incubation surveys averaged 1.6, 0.6, and 0.2 godwits/km2 in areas of managed, natural, and no wetland basins, and 1.2, 0.3, and 0.1 godwit nests/km2. For long-billed curlews, pre-incubation surveys averaged 0.1, 0.2, and 0.1 birds/km2, and 0, 0.2, and 0 nests/km2. Nest success was similar in areas with and without managed wetlands. Shallow managed wetlands in this region appear beneficial to willets and marbled godwits, but not necessarily to long-billed curlews. Only 8% of marked willets and godwits with nests in the area were seen or heard during surveys, compared with 29% of pre-laying individuals and 42% of birds with broods. This suggests that a low and variable percentage of these birds is counted during breeding bird surveys, likely limiting their ability to adequately monitor

  20. Controlled breeding and reproductive management in water buffaloes (Bubalus bubalis) using Eazi Breed controlled internal drug release.

    Science.gov (United States)

    Hiremath, Shivayogi; Ramesha, Kerekoppa P

    2015-06-04

    Buffalo reproduction is considerably affected by late maturity, poor oestrus symptoms and long postpartum periods. This study was undertaken to evaluate the efficiency of Eazi Breed controlled internal drug release (CIDR), an intravaginal progesterone-releasing device, in relation to oestrus and fertility. Five hundred true anoestrus buffalo cows, in the age group 4-6 years in 10 villages of Dharwad district in Karnataka state in India, were randomly selected and treated with CIDR for 9 days. Two mL of Cidirol (1 mg oestradiol benzoate) was administered intramuscularly to all animals on day 10. Forty-two buffaloes (8.4%) that failed to show oestrus signs (1.6%) or showed weak signs of oestrus (6.8%) after the first treatment were treated again 72 h after the Cidriol injection with a new device, and inseminated after the expression of oestrus. After the second treatment all the animals showed oestrus signs. The percentage of buffaloes showing intense oestrus was 67.40%, intermediate oestrus was shown by 25.80%, whilst 6.80% buffaloes showed weak oestrus even after the second treatment. The buffaloes showing oestrus signs were inseminated twice with an interval of 12 h, starting 12 h after the start of the oestrus signs. In 86 buffaloes showing prolonged oestrus signs a third insemination was done. The conception rates were 85.16%, 60.47% and 44.11% respectively in buffaloes showing intense, intermediate and weak oestrus. Transrectal palpation of the genital tract was performed 45-60 days post-insemination to diagnose pregnancy status, and in doubtful cases pregnancy was reconfirmed at 90 days after insemination. Out of 500 buffaloes treated in this way 380 animals became pregnant and the pregnancy rate was 76%. This study revealed the usefulness of Eazi Breed CIDR along with Cidirol treatment in buffaloes to improve their reproductive performance.

  1. Controlled breeding and reproductive management in water buffaloes (Bubalus bubalis using Eazi Breed controlled internal drug release

    Directory of Open Access Journals (Sweden)

    Shivayogi Hiremath

    2015-06-01

    Full Text Available Buffalo reproduction is considerably affected by late maturity, poor oestrus symptoms and long postpartum periods. This study was undertaken to evaluate the efficiency of Eazi Breed controlled internal drug release (CIDR, an intravaginal progesterone-releasing device, in relation to oestrus and fertility. Five hundred true anoestrus buffalo cows, in the age group 4–6 years in 10 villages of Dharwad district in Karnataka state in India, were randomly selected and treated with CIDR for 9 days. Two mL of Cidirol (1 mg oestradiol benzoate was administered intramuscularly to all animals on day 10. Forty-two buffaloes (8.4% that failed to show oestrus signs (1.6% or showed weak signs of oestrus (6.8% after the first treatment were treated again 72 h after the Cidriol injection with a new device, and inseminated after the expression of oestrus. After the second treatment all the animals showed oestrus signs. The percentage of buffaloes showing intense oestrus was 67.40%, intermediate oestrus was shown by 25.80%, whilst 6.80% buffaloes showed weak oestrus even after the second treatment. The buffaloes showing oestrus signs were inseminated twice with an interval of 12 h, starting 12 h after the start of the oestrus signs. In 86 buffaloes showing prolonged oestrus signs a third insemination was done. The conception rates were 85.16%, 60.47% and 44.11% respectively in buffaloes showing intense, intermediate and weak oestrus. Transrectal palpation of the genital tract was performed 45–60 days post-insemination to diagnose pregnancy status, and in doubtful cases pregnancy was reconfirmed at 90 days after insemination. Out of 500 buffaloes treated in this way 380 animals became pregnant and the pregnancy rate was 76%. This study revealed the usefulness of Eazi Breed CIDR along with Cidirol treatment in buffaloes to improve their reproductive performance.

  2. Customer relationship management in the contract pharmaceutical industry: an exploratory study for measuring success.

    Science.gov (United States)

    Kros, John F; Nadler, Scott; Molis, Justin

    2007-01-01

    Managing customer relationships is a very important issue in business-to-business markets. This research investigates the growing number of available resources defining Customer Relationship Management (CRM) efforts, and how they are being applied within the Contract Pharmaceutical Manufacturing industry. Exploratory study results using face-to-face and telephone questionnaires based on four criteria for rating a company's CRM efforts are presented. Data was collected from large Contract Pharmaceutical Manufacturing companies in the US market. The results and conclusions are discussed relating how the Contract Pharmaceutical Manufacturing industry is implementing CRM including some potential steps to take when considering a CRM initiative.

  3. Breeding Biology of Grassland Birds in Western New York: Conservation and Management Implications

    Directory of Open Access Journals (Sweden)

    Christopher J. Norment

    2010-12-01

    Full Text Available Declining grassland breeding bird populations have led to increased efforts to assess habitat quality, typically by estimating density or relative abundance. Because some grassland habitats may function as ecological traps, a more appropriate metric for determining quality may be breeding success. Between 1994 and 2003 we gathered data on the nest fates of Eastern Meadowlarks (Sturnella magna, Bobolinks (Dolichonyx oryzivorous, and Savannah Sparrows (Passerculus sandwichensis in a series of fallow fields and pastures/hayfields in western New York State. We calculated daily survival probabilities using the Mayfield method, and used the logistic-exposure method to model effects of predictor variables on nest success. Nest survival probabilities were 0.464 for Eastern Meadowlarks (n = 26, 0.483 for Bobolinks (n = 91, and 0.585 for Savannah Sparrows (n = 152. Fledge dates for first clutches ranged between 14 June and 23 July. Only one obligate grassland bird nest was parasitized by Brown-headed Cowbirds (Molothrus ater, for an overall brood parasitism rate of 0.004. Logistic-exposure models indicated that daily nest survival probabilities were higher in pastures/hayfields than in fallow fields. Our results, and those from other studies in the Northeast, suggest that properly managed cool season grassland habitats in the region may not act as ecological traps, and that obligate grassland birds in the region may have greater nest survival probabilities, and lower rates of Brown-headed Cowbird parasitism, than in many parts of the Midwest.

  4. Habitat Requirements of Breeding Black-Backed Woodpeckers (Picoides arcticus in Managed, Unburned Boreal Forest

    Directory of Open Access Journals (Sweden)

    Junior A. Tremblay

    2009-06-01

    Full Text Available We investigated home-range characteristics and habitat selection by Black-backed Woodpeckers (Picoides arcticus in an unburned, boreal forest landscape managed by mosaic harvesting in Quebec, Canada. Habitat selection by this species was specifically examined to determine home-range establishment and foraging activities. We hypothesized that Black-backed Woodpeckers would respond to harvesting by adjusting their home-range size as a function of the amount of dead wood available. Twenty-two birds were tracked using radiotelemetry, and reliable estimates of home-range size were obtained for seven breeding individuals (six males and one female. The average home-range size was 151.5 ± 18.8 ha (range: 100.4-256.4 ha. Our results indicate that this species establishes home ranges in areas where both open and forested habitats are available. However, during foraging activities, individuals preferentially selected areas dominated by old coniferous stands. The study also showed that the spatial distribution of preferred foraging habitat patches influenced space use, with home-range area increasing with the median distance between old coniferous habitat patches available within the landscape. Finally, these data show that Black-backed Woodpeckers may successfully breed in an unburned forest with at least 35 m3 • ha-1 of dead wood, of which 42% (15 m3 • ha-1 is represented by dead wood at the early decay stage.

  5. An Experimental Test of Buffer Utility as a Technique for Managing Pool-Breeding Amphibians.

    Science.gov (United States)

    Powell, Jessica S Veysey; Babbitt, Kimberly J

    2015-01-01

    Vegetated buffers are used extensively to manage wetland-dependent wildlife. Despite widespread application, buffer utility has not been experimentally validated for most species. To address this gap, we conducted a six-year, landscape-scale experiment, testing how buffers of different widths affect the demographic structure of two amphibian species at 11 ephemeral pools in a working forest of the northeastern U.S. We randomly assigned each pool to one of three treatments (i.e., reference, 100m buffer, 30m buffer) and clearcut to create buffers. We captured all spotted salamanders and wood frogs breeding in each pool and examined the impacts of treatment and hydroperiod on breeding-population abundance, sex ratio, and recapture rate. The negative effects of clearcutting tended to increase as forest-buffer width decreased and be strongest for salamanders and when other stressors were present (e.g., at short-hydroperiod pools). Recapture rates were reduced in the 30m, but not 100m, treatment. Throughout the experiment for frogs, and during the first year post-cut for salamanders, the predicted mean proportion of recaptured adults in the 30m treatment was only 62% and 40%, respectively, of that in the reference treatment. Frog sex ratio and abundance did not differ across treatments, but salamander sex ratios were increasingly male-biased in both cut treatments. By the final year, there were on average, only about 40% and 65% as many females predicted in the 100m and 30m treatments, respectively, compared to the first year. Breeding salamanders at short-hydroperiod pools were about 10% as abundant in the 100m versus reference treatment. Our study demonstrates that buffers partially mitigate the impacts of habitat disturbance on wetland-dependent amphibians, but buffer width and hydroperiod critically mediate that process. We provide the first experimental evidence showing that 30-m-wide buffers may be insufficient for maintaining resilient breeding populations of pool

  6. An Experimental Test of Buffer Utility as a Technique for Managing Pool-Breeding Amphibians.

    Directory of Open Access Journals (Sweden)

    Jessica S Veysey Powell

    Full Text Available Vegetated buffers are used extensively to manage wetland-dependent wildlife. Despite widespread application, buffer utility has not been experimentally validated for most species. To address this gap, we conducted a six-year, landscape-scale experiment, testing how buffers of different widths affect the demographic structure of two amphibian species at 11 ephemeral pools in a working forest of the northeastern U.S. We randomly assigned each pool to one of three treatments (i.e., reference, 100m buffer, 30m buffer and clearcut to create buffers. We captured all spotted salamanders and wood frogs breeding in each pool and examined the impacts of treatment and hydroperiod on breeding-population abundance, sex ratio, and recapture rate. The negative effects of clearcutting tended to increase as forest-buffer width decreased and be strongest for salamanders and when other stressors were present (e.g., at short-hydroperiod pools. Recapture rates were reduced in the 30m, but not 100m, treatment. Throughout the experiment for frogs, and during the first year post-cut for salamanders, the predicted mean proportion of recaptured adults in the 30m treatment was only 62% and 40%, respectively, of that in the reference treatment. Frog sex ratio and abundance did not differ across treatments, but salamander sex ratios were increasingly male-biased in both cut treatments. By the final year, there were on average, only about 40% and 65% as many females predicted in the 100m and 30m treatments, respectively, compared to the first year. Breeding salamanders at short-hydroperiod pools were about 10% as abundant in the 100m versus reference treatment. Our study demonstrates that buffers partially mitigate the impacts of habitat disturbance on wetland-dependent amphibians, but buffer width and hydroperiod critically mediate that process. We provide the first experimental evidence showing that 30-m-wide buffers may be insufficient for maintaining resilient breeding

  7. Defense Procurement: An Analysis of Contract Management Internal Controls

    Science.gov (United States)

    2015-03-22

    management to discuss what could go wrong within the organization and how to best mitigate any potential risks , including fraud risks ( COSO , 2013...knowledge management system supporting its governance of processes and practices (Power, 1996, p. 289). Organizations’ increased concern for risk ...meeting the organizational goals set by management ( COSO , 2013). If any controls need to be updated, changed, removed, or added, management can

  8. 48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...

  9. PROFILE: Integrated Management to Create New Breeding Habitat for Dalmatian Pelicans (Pelecanus crispus) in Greece

    Science.gov (United States)

    Pyrovetsi

    1997-09-01

    / An integrated management plan to create favorable nesting habitat for the world-endangered Dalmatian pelicans, was tested at Kerkini irrigation reservoir, a Ramsar wetland. The lake is the major wintering site of Dalmatian pelicans in Europe, where the species lives year-round without breeding. The rise of water level at the reservoir during spring (exceeding 5 m) has an impact on the whole system, including several birds, which lose their nesting habitat. Although the integrity of the wetland demands ecological restoration with changes in its hydrologic regime, local socioeconomic conditions allow only habitat level interventions. During the planning phase of the management plan, both the ecological and social context of the interventions were considered. Monitoring of all pelican habitats and populations provided the scientific basis, while a socioecological survey on knowledge/attitudes of local fishermen toward wetland identified conflicts with specific resources and planned management. To gain public support, a broad information/education program was implemented. The education program for fishermen was based on the findings of the socioecological survey. The in situ management involved experimental construction of floating rafts, platforms over water, dredged-spoil islands, and platforms at various sites of the wetland. Monitoring of the managed habitats showed that most waterbirds used them for resting and roosting. Common terns nested on the rafts, cormorants on the platforms, and Dalmatian pelicans on the man-made island. Under the prevailing hydrologic and weather conditions, islands seem to be the most suitable habitat for pelican nesting. It is concluded that wildlife habitat management should integrate the ecological component, related to the needs of the species and ecosystem, with the social one, expressed by cooperation and involvement of the local community.KEY WORDS: Integrated management; Pelican; Nesting habitat; Habitat management; Reservoir

  10. [Breeding and management of mycobacteria-free guinea pigs (author's transl)].

    Science.gov (United States)

    Kazda, J

    1976-08-01

    A number of mycobacterial species are detectable under conventional holding condition of guinea pigs. These mycobacteria originating in drinking water and litter caused cross reactions in the Jones-Mote hypersensitivity test. Using suitable precautions it was possible to breed and hold the animals mycobacteria-free. The precautions depend mainly in alteration of the wire mesh floor in cages to avoide the contact of the animals with the litter, in cleaning and desinfection of water bottles, in using of heated water and food and in the prevention of mycobacterial contamination from the staff. The control examination on mycobacteria without treating is given in details. Cases are refered in which a oral rece ption of mycobacteria can alter the immune response. The modification of guinea pigs management to the mycobacteria-free ones is possible in a short time and with minimal cost.

  11. Characteristics of malaria vector breeding habitats in Sri Lanka: relevance for environmental management

    DEFF Research Database (Denmark)

    Hoek, Wim van der; Amerasinghe, F P; Konradsen, F

    1998-01-01

    , potential secondary vectors, were characterized by site, exposure to sunlight, substratum, turbidity of the water, presence of vegetation, and presence of fauna. Availability of pools of stagnant water in the stream near the village and along the edge of the village tank was highly predictive for presence......In and around a village in the Anuradhapura District of Sri Lanka anopheline larvae were sampled from July 1994 to April 1996 in all surface water bodies. Samples positive for Anopheles culicifacies, the established vector of malaria in Sri Lanka, and for An. barbirostris, An. vagus, and An. varuna...... clear water pools, was able to exploit habitats that were shaded and contained turbid water. Environmental management interventions to control An. culicifacies breeding have to take into account that the secondary vectors of malaria exploit other habitats and would not be affected by the interventions....

  12. Pre-breeding blood urea nitrogen concentration and reproductive performance of Bonsmara heifers within different management systems.

    Science.gov (United States)

    Tshuma, Takula; Holm, Dietmar Erik; Fosgate, Geoffrey Theodore; Lourens, Dirk Cornelius

    2014-08-01

    This study investigated the association between pre-breeding blood urea nitrogen (BUN) concentration and reproductive performance of beef heifers within different management systems in South Africa. Bonsmara heifers (n = 369) from five herds with different estimated levels of nitrogen intake during the month prior to the commencement of the breeding season were sampled in November and December 2010 to determine BUN concentrations. Body mass, age, body condition score (BCS) and reproductive tract score (RTS) were recorded at study enrolment. Trans-rectal ultrasound and/or palpation was performed 4-8 weeks after a 3-month breeding season to estimate the stage of pregnancy. Days to pregnancy (DTP) was defined as the number of days from the start of the breeding season until the estimated conception date. Logistic regression and Cox proportional hazards survival analysis were performed to estimate the association of pre-breeding BUN concentration with subsequent pregnancy and DTP, respectively. After stratifying for herd and adjusting for age, heifers with relatively higher pre-breeding BUN concentration took longer to become pregnant when compared to those with relatively lower BUN concentration (P = 0.011). In the herd with the highest estimated nitrogen intake (n = 143), heifers with relatively higher BUN were less likely to become pregnant (P = 0.013) and if they did, it was only later during the breeding season (P = 0.017), after adjusting for body mass. These associations were not present in the herd (n = 106) with the lowest estimated nitrogen intake (P > 0.500). It is concluded that Bonsmara heifers with relatively higher pre-breeding BUN concentration, might be at a disadvantage because of this negative impact on reproductive performance, particularly when the production system includes high levels of nitrogen intake.

  13. Gas contract portfolio management: a stochastic programming approach

    International Nuclear Information System (INIS)

    Haurie, A.; Smeers, Y.; Zaccour, G.

    1991-01-01

    This paper deals with a stochastic programming model which complements long range market simulation models generating scenarios concerning the evolution of demand and prices for gas in different market segments. Agas company has to negociate contracts with lengths going from one to twenty years. This stochastic model is designed to assess the risk associated with committing the gas production capacity of the company to these market segments. Different approaches are presented to overcome the difficulties associated with the very large size of the resulting optimization problem

  14. Managing Reputation in Contract-Based Distributed Systems

    Science.gov (United States)

    Baldoni, Roberto; Doria, Luca; Lodi, Giorgia; Querzoni, Leonardo

    In industry practice, bilateral agreements are established between providers and consumers of services in order to regulate their business relationships. In particular, Quality of Service (QoS) requirements are specified in those agreements in the form of legally binding contracts named Service Level Agreements (SLA). Meeting SLAs allows providers to be seen in the eyes of their clients, credible, reliable, and trustworthy. This contributes to augment their reputation that can be considered an important and competitive advantage for creating potentially new business opportunities.

  15. Cutting out the middleman: physicians can contract directly with employers--a viable alternative to adversarial managed care agreements.

    Science.gov (United States)

    Lester, Howard

    2002-01-01

    HMOs, PPOs, and other managed care "middlemen" control the means by which most physicians do business with employers. As physicians face dwindling reimbursements, greater practice restrictions, and increased pressure to sign adversarial middleman contracts, interest in direct contracting has grown. This article introduces direct contracting as an important alternative to commercial managed care agreements; cites the key advantages and process of direct contracting; and offers practical recommendations for helping physician practices successfully negotiate direct physician/employer agreements.

  16. The economical contracting management in Agricultural Cooperatives: tools for evaluating their performance.

    Directory of Open Access Journals (Sweden)

    Rafael Enrique Viña Echevarría

    2014-06-01

    Full Text Available The economic and management contracts involve strategic actions, legal and operational purposes that make possible to convert the goal of an organization on results that express the fulfillment of the mandates and satisfies customers on the basis of the duties and obligations set out in the negotiating document. This article aims to get inside into the performance evaluation of the management of the recruitment of Agricultural Cooperatives and to reflex about the insufficiencies evidenced in this process. To which we developed a theoretical valuation and economic procurement praxiological showing a group of deficiencies that have impacted in the contracts management The study was able to obtain, process, analyze, interpret and argue the problems associated with economic contracting and justify the need to propose a system of indicators to assess recruitment management Agricultural Cooperatives in the province of Sancti Spiritus, the results revealed the ineffectiveness of the process and the negative impact on the productive base.

  17. Exploration and practice on contract management of Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Wang Yonggang

    2002-01-01

    In the market economy, Daya Bay Nuclear Power Station needs to out source or allow to suppliers among industries, while concentrating its core competitive capability, for safely and stable operation. By evaluating the features of contract management in Daya Bay Nuclear Power Station, set up the organization and process of the supply management

  18. Implementation guide for Hanford Tanks Initiative C-106 heel retrieval contract management HNF-2511

    International Nuclear Information System (INIS)

    McDaniel, L.B.

    1998-01-01

    This report is an Implementation Guide for Hanford Tanks Initiative C-106 heel retrieval contract management HNF-2511 to provide a set of uniform instructions for managing the two contractors selected. The primary objective is to produce the necessary deliverables and services for the HTI project within schedule and budget

  19. Optimal contract for a fund manager, with capital injections and endogenous trading constraints

    OpenAIRE

    Nadtochiy, Sergey; Zariphopoulou, Thaleia

    2018-01-01

    In this paper, we construct a solution to the optimal contract problem for delegated portfolio management of the fist-best (risk-sharing) type. The novelty of our result is (i) in the robustness of the optimal contract with respect to perturbations of the wealth process (interpreted as capital injections), and (ii) in the more general form of principals objective function, which is allowed to depend directly on the agents strategy, as opposed to being a function of the generated wealth only. ...

  20. Defense Contract Management Command Capitalization of Fixed Assets

    National Research Council Canada - National Science Library

    Young, Shelton

    1997-01-01

    The audit objective was to determine whether the Defense Logistics Agency and the Defense Finance and Accounting Service had implemented effective management control procedures and complied with laws...

  1. Privacy Management Contracts And Economics, Using Service Level Agreements (Sla)

    NARCIS (Netherlands)

    L-F. Pau (Louis-François)

    2005-01-01

    textabstractRecognizing the importance of privacy management as a business process and a business support process, this paper proposes the use of service level agreements around privacy features, including qualitative and quantitative ones. It also casts privacy management into a business

  2. Management in general practice: the challenge of the new General Medical Services contract.

    Science.gov (United States)

    Checkland, Kath

    2004-10-01

    Managers in general practice perform a variety of roles, from purely administrative to higher-level strategic planning. There has been little research investigating in detail how they perform these roles and the problems that they encounter. The new General Medical Services (GMS) contract contains new management challenges and it is not clear how practices will meet these. To improve understanding of the roles performed by managers in general practice and to consider the implications of this for the implementation of the new GMS contract. In-depth qualitative case studies covering the period before and immediately after the vote in favour of the new GMS contract. Three general practices in England, chosen using purposeful sampling. Semi-structured interviews with all clinical and managerial personnel in each practice, participant and non-participant observation, and examination of documents. Understanding about what constitutes the legitimate role of managers in general practice varies both within and between practices. Those practices in the study that employed a manager to work at a strategic level with input into the direction of the organisation demonstrated significant problems with this in practice. These included lack of clarity about what the legitimate role of the manager involved, problems relating to the authority of managers in the context of a partnership, and lack of time available to them to do higher-level work. In addition, general practitioners (GPs) were not confident about their ability to manage their managers' performance. The new GMS contract will place significant demands on practice management. These results suggest that it cannot be assumed that simply employing a manager with high-level skills will enable these demands to be met; there must first be clarity about what the manager should be doing, and attention must be directed at questions about the legitimacy enjoyed by such a manager, the limits of his or her authority, and the

  3. Archive eggs: a research and management tool for avian conservation breeding

    Science.gov (United States)

    Smith, Des H.V.; Moehrenschlager, Axel; Christensen, Nancy; Knapik, Dwight; Gibson, Keith; Converse, Sarah J.

    2012-01-01

    Worldwide, approximately 168 bird species are captive-bred for reintroduction into the wild. Programs tend to be initiated for species with a high level of endangerment. Depressed hatching success can be a problem for such programs and has been linked to artificial incubation. The need for artificial incubation is driven by the practice of multiclutching to increase egg production or by uncertainty over the incubation abilities of captive birds. There has been little attempt to determine how artificial incubation differs from bird-contact incubation. We describe a novel archive (data-logger) egg and use it to compare temperature, humidity, and egg-turning in 5 whooping crane (Grus americana) nests, 4 sandhill crane (G. canadensis) nests, and 3 models of artificial incubator; each of which are used to incubate eggs in whooping crane captive-breeding programs. Mean incubation temperature was 31.7° C for whooping cranes and 32.83° C for sandhill cranes. This is well below that of the artificial incubators (which were set based on a protocol of 37.6° C). Humidity in crane nests varied considerably, but median humidity in all 3 artificial incubators was substantially different from that in the crane nests. Two artificial incubators failed to turn the eggs in a way that mimicked crane egg-turning. Archive eggs are an effective tool for guiding the management of avian conservation breeding programs, and can be custom-made for other species. They also have potential to be applied to research on wild populations.

  4. Avian response to timber harvesting applied experimentally to manage Cerulean Warbler breeding populations

    Science.gov (United States)

    Sheehan, James; Wood, Petra Bohall; Buehler, David A.; Keyser, Patrick D.; Larkin, Jeffrey L.; Rodewald, Amanda D.; Wigley, T. Bently; Boves, Than J.; George, Gregory A.; Bakermans, Marja H.; Beachy, Tiffany A.; Evans, Andrea; McDermott, Molly E.; Newell, Felicity L.; Perkins, Kelly A.; White, Matthew

    2014-01-01

    Timber harvesting has been proposed as a management tool to enhance breeding habitat for the Cerulean Warbler (Setophaga cerulea), a declining Neotropical–Nearctic migratory songbird that nests in the canopy of mature eastern deciduous forests. To evaluate how this single-species management focus might fit within an ecologically based management approach for multiple forest birds, we performed a manipulative experiment using four treatments (three intensities of timber harvests and an unharvested control) at each of seven study areas within the core Cerulean Warbler breeding range. We collected pre-harvest (one year) and post-harvest (four years) data on the territory density of Cerulean Warblers and six additional focal species, avian community relative abundance, and several key habitat variables. We evaluated the avian and habitat responses across the 3–32 m2 ha−1 residual basal area (RBA) range of the treatments. Cerulean Warbler territory density peaked with medium RBA (∼16 m2 ha−1). In contrast, territory densities of the other focal species were negatively related to RBA (e.g., Hooded Warbler [Setophaga citrina]), were positively related to RBA (e.g., Ovenbird [Seiurus aurocapilla]), or were not sensitive to this measure (Scarlet Tanager [Piranga olivacea]). Some species (e.g., Hooded Warbler) increased with time post-treatment and were likely tied to a developing understory, whereas declines (e.g., Ovenbird) were immediate. Relative abundance responses of additional species were consistent with the territory density responses of the focal species. Across the RBA gradient, greatest separation in the avian community was between early successional forest species (e.g., Yellow-breasted Chat [Icteria virens]) and closed-canopy mature forest species (e.g., Ovenbird), with the Cerulean Warbler and other species located intermediate to these two extremes. Overall, our results suggest that harvests within 10–20 m2 ha−1 RBA yield the largest

  5. WasteWise Resource Management: Innovative Solid Waste Contracting Methods

    Science.gov (United States)

    Resource management is an innovative contractual partnership between a waste-generating organization and a qualified contractor that changes the nature of current disposal services to support waste minimization and recycling.

  6. Risk Taking and Optimal Contracts for Money Managers

    OpenAIRE

    Palomino, Frédéric; Prat, Andrea

    1999-01-01

    Recent empirical work suggests a strong connection between the incentives money managers are offered and their risk-taking behavior. We develop a general model of delegated portfolio management, with the feature that the agent can control the riskiness of the portfolio. This represents a departure from the existing literature on agency theory in that moral hazard is not only effort exertion but also risk taking behavior. The moral hazard problem with risk taking involves an incentive-compatib...

  7. [The use of management contracts and professional incentives in the public health sector].

    Science.gov (United States)

    Ditterich, Rafael Gomes; Moysés, Simone Tetu; Moysés, Samuel Jorge

    2012-04-01

    Results-based management is a cornerstone of reform in public administration, including the health field, and has become the basis for other innovations such as the institutionalization of management contracts and the use of professional incentives. This review article aims to introduce and discuss the use of such management contracts in the public health sector. Management by results has developed means and tools that highlight the importance of shared responsibility and mutual commitment between workers and management-level directors. Thus, preset goals are negotiated among all the stakeholders and are evaluated periodically in order to grant professional incentives. It is necessary to improve the mechanisms for control and observation, to more precisely determine the healthcare and management indicators and their patterns, to train stakeholders in designing the plan, and to improve the use of professional incentives in order to effectively increase accountability vis-à-vis the desired results.

  8. Options analysis of managed care contracting and regulation: theory and evidence.

    Science.gov (United States)

    McLean, R A; Magiera, F T

    2000-08-01

    Managed care contracts can be represented as bundles of options. In particular, the managed care provider is short a call option. To hedge the risk involved in such contracts, managed care contractors can construct several types of virtual put options, among them the ownership of facilities. Agency theory and options theory suggest that for-profit managed care plans, in the presence of debt, will engage in less hedging activity than will other managed care plans. Here, the authors test that hypothesis, using data for Florida HMOs in 1995, and they reject the null hypothesis. That managed care organizations act as if they are short a call option raises interesting regulatory issues, including the possibility of using a hedge-based regulatory scheme in place of a net-worth-based scheme.

  9. Dependence on Supplier, Supplier Trust and Green Supplier Integration: The Moderating Role of Contract Management Difficulty

    Directory of Open Access Journals (Sweden)

    Xuesong Zhao

    2018-05-01

    Full Text Available This study aims to investigate the impacts of dependence on supplier and supplier trust on green supplier integration, and the moderating role of contract management difficulty. In this study, we develop a dependence-trust-integration model based on resource dependence theory, social capital theory and transaction cost theory. We examine the hypothesized relationships using hierarchical regression analyses based on data collected from 187 Chinese firms. Our findings suggest that dependence on supplier has positive impacts on green supplier integration and supplier trust. Supplier trust partially mediates the relationship between dependence on supplier and green supplier integration. In addition, contract management difficulty negatively moderates the relationship between supplier trust and green supplier integration. This research contributes to the literature by offering empirical evidence concerning the indirect relationship between dependence on supplier and green supplier integration via supplier trust, and the trust-integration link depends on the level of contract management difficulty.

  10. Reduction of construction wastes by improving construction contract management: a multinational evaluation.

    Science.gov (United States)

    Mendis, Daylath; Hewage, Kasun N; Wrzesniewski, Joanna

    2013-10-01

    The Canadian construction industry generates 30% of the total municipal solid waste deposited in landfills. Ample evidence can be found in the published literature about rework and waste generation due to ambiguity and errors in contract documents. Also, the literature quotes that disclaimer clauses in contract documents are included in the contractual agreements to prevent contractor claims, which often cause rework. Our professional practice has also noted that there are several disclaimer clauses in standard contract documents which have the potential to cause rework (and associated waste). This article illustrates a comparative study of standard contractual documents and their potential to create rework (and associated waste) in different regions of the world. The objectives of this study are (1) to analyse standard contractual documents in Canada, the USA and Australia in terms of their potential to generate rework and waste, and (2) to propose changes/amendments to the existing standard contract documents to minimise/avoid rework. In terms of construction waste management, all the reviewed standard contract documents have deficiencies. The parties that produce the contract documents include exculpatory clauses to avoid the other party's claims. This approach tends to result in rework and construction waste. The contractual agreements/contract documents should be free from errors, deficiencies, ambiguity and unfair risk transfers to minimise/avoid potential to generate rework and waste.

  11. 75 FR 2463 - Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers...

    Science.gov (United States)

    2010-01-15

    ... be considered a breach of contract and shall not entitle the Contractor to a price adjustment under... constitute a breach of this contract and shall not entitle the Contractor to any price adjustment under the... Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers Clauses...

  12. Shadow management applied in the first AP1000 project under the islands contract condition

    International Nuclear Information System (INIS)

    Liu Xiao

    2010-01-01

    As the global first AP1000 nuclear project, Sanmen phase I nuclear project itself has many challenges from design, procurement to construction managements for non practical nuclear project and experience can be referenced. Islands contract pattern was adopted by this project and this contract pattern has its own strength and weakness. Considering the negative influence result from the first unit, this project has the great postpone risk. Shadow management here tries to reduce these risks and enhance the project surveillance and control by the owner to promote the final goal of this project. (authors)

  13. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  14. Review: Deciphering animal robustness. A synthesis to facilitate its use in livestock breeding and management.

    Science.gov (United States)

    Friggens, N C; Blanc, F; Berry, D P; Puillet, L

    2017-12-01

    As the environments in which livestock are reared become more variable, animal robustness becomes an increasingly valuable attribute. Consequently, there is increasing focus on managing and breeding for it. However, robustness is a difficult phenotype to properly characterise because it is a complex trait composed of multiple components, including dynamic elements such as the rates of response to, and recovery from, environmental perturbations. In this review, the following definition of robustness is used: the ability, in the face of environmental constraints, to carry on doing the various things that the animal needs to do to favour its future ability to reproduce. The different elements of this definition are discussed to provide a clearer understanding of the components of robustness. The implications for quantifying robustness are that there is no single measure of robustness but rather that it is the combination of multiple and interacting component mechanisms whose relative value is context dependent. This context encompasses both the prevailing environment and the prevailing selection pressure. One key issue for measuring robustness is to be clear on the use to which the robustness measurements will employed. If the purpose is to identify biomarkers that may be useful for molecular phenotyping or genotyping, the measurements should focus on the physiological mechanisms underlying robustness. However, if the purpose of measuring robustness is to quantify the extent to which animals can adapt to limiting conditions then the measurements should focus on the life functions, the trade-offs between them and the animal's capacity to increase resource acquisition. The time-related aspect of robustness also has important implications. Single time-point measurements are of limited value because they do not permit measurement of responses to (and recovery from) environmental perturbations. The exception being single measurements of the accumulated consequence of a

  15. Final Report on the Audit of the Administration of the Contract Closeout Process at the Defense Contract Management Region, Dallas

    National Research Council Canada - National Science Library

    1990-01-01

    .... The audit was made from January to October 1989. The objectives of the audit were to determine the timeliness of the contract closeout process, the validity of unliquidated obligations on contracts awaiting closeout, and the timeliness...

  16. School Building Projects: Managing Insurance and Contracts during Construction

    Science.gov (United States)

    Shands, Richard

    2011-01-01

    Managing the risks inherent in a building project presents a challenge and opportunities not often encountered in the ordinary affairs of a school district. A building project brings the district, its staff, and students, as well as the community, in close contact with architects and engineers and a number of contractors for a period of time often…

  17. Beyond the contract: managing risk in supply chain relations

    NARCIS (Netherlands)

    Dekker, H.C.; Sakaguchi, J.; Kawai, T.

    2013-01-01

    As a consequence of the development of intensified relations with suppliers, for many firms the supply chain has become a significant source of risk exposure. In this paper we examine firms' use of control practices to manage risks associated with intensified collaboration with supply chain

  18. Further Improvements Needed in Navy’s Oversight and Management of Contracting for Facilities Construction on Diego Garcia.

    Science.gov (United States)

    1984-05-23

    1981, the Navy awarded a cost reimbursable contract to a joint venture to construct facility projects for fiscal years 1981 and 1982 with an estimated...through fiscal year 1986. In July 1981, the Navy awarded a cost reimburs - able contract (cost plus award fee) to Raymond, Brown & Root, Molem, a joint...Navy’s oversight and management of the acquisition of these facilities. A COST REIMBURSABLE CONTRACT MAKES STRONG CONTRACT ADMINISTRATION VITAL Under

  19. Using Blockchain and smart contracts for secure data provenance management

    OpenAIRE

    Ramachandran, Aravind; Kantarcioglu, Dr. Murat

    2017-01-01

    Blockchain technology has evolved from being an immutable ledger of transactions for cryptocurrencies to a programmable interactive the environment for building distributed reliable applications. Although, blockchain technology has been used to address various challenges, to our knowledge none of the previous work focused on using blockchain to develop a secure and immutable scientific data provenance management framework that automatically verifies the provenance records. In this work, we le...

  20. Impacts of Nutrition and Feeding Programs on Farmers’ Management Decisions Affecting the Success of Dairy Farms with Culture Breed Cattle

    Directory of Open Access Journals (Sweden)

    Yavuz Topcu

    2016-02-01

    Full Text Available The aim of the study is to evaluate all the factors determining the milk production and yield decisions with regard to the nutrition and feeding programs affecting the integrated management strategies on the success of the dairy farms with culture breed cattle under the pasture-based and indoor barn-based production systems. For these aims, data obtained from the individual interviews conducted at the dairy farms with 100 culture breed cattle were used for Principal Component and Multiple Regression Analyses. The results of the study highlighted that while there were linear positive relationships among liquid assets of farms value, concentrate feed and fodder intake of dairy cattle, milk sale price, forage crop support, additional feeding and their types at pasture and milk yields per dairy cattle at the dairy farms; there were inverse relationships among hay intake of dairy cattle, lactation period, pasture planning, culture breed cattle support and those. The farmers could increase the successes of the dairy farms by increasing the technical and economic effectiveness under the integrated management pattern approaches at those with culture breed cattle.

  1. Usage of Option Contracts for Foreign Exchange Risk Management

    Directory of Open Access Journals (Sweden)

    Daniel Armeanu

    2007-06-01

    Full Text Available Today in Romania, in the context of the liberalization of the capital account and under a floating exchange rate (official is a managed floating currency regime established by National Bank of Romania the foreign exchange rate is very volatile. In consequence the financial institutions, corporations and, especially, the importers and exporters have to deal with a big exposition of currency risk related with their activities. Financial institutions and corporations today must adopt new roles in order to compete successfully in the explosively evolving foreign exchange markets. The methods, instruments and techniques used to manage foreign exchange risk are more complex than ever before. The objective of our paper is to provide the techniques and insights needed to pinpoint opportunities and control risks. We will present the most modern practical methods for managing the currency risk: option strategies (spread, strangle, straddle, etc. Also we will present the advantage, the disadvantage and our opinions related with the use of currency derivatives instruments (especially currency strategies options, making a comparative analysis.

  2. The new Facilities Management contract at CERN from 1st July 2002

    CERN Document Server

    Mauro Nonis

    2002-01-01

    Within the ST Division, all the Facilities Management activities have been under the ST/TFM group responsibility until the 30th June 2002, who has performed them using around 20 industrial support contracts. Starting from the 1st July 2002 a new unit, ST/FM, will take over these activities that will be unified into one single contract that has been adjudicated to the company Facilities Management Network SA. This contract will be in charge of the maintenance and minor works on tertiary installations (i.e. all structures and installations that have no direct relation to the running of the accelerators) for the following trades: - Technical: heating, ventilation, air conditioning, plumbing, electricity, civil engineering (painting, roofing, glazing, blinds, fencing, masonry etc.), passenger and goods lifts, automatic and powered doors, kitchen equipment, roads, signs, keys and locks, office furniture, - Services: waste collection, security, green areas, cleaning and sanitary supplies, disinfection, rodent cont...

  3. THE NEW FACILITIES MANAGEMENT CONTRACT AT CERN FROM 1st JULY 2002

    CERN Multimedia

    Mauro Nonis

    2002-01-01

    Within the ST Division, all the Facilities Management activities have been under the ST/TFM group responsibility until the 30th June 2002, who has performed them using around 20 industrial support contracts. Starting from the 1st July 2002 a new unit, ST/FM, will take over these activities that will be unified into one single contract that has been adjudicated to the company Facilities Management Network SA. This contract will be in charge of the maintenance and minor works on tertiary installations (i.e. all structures and installations that have no direct relation to the running of the accelerators) for the following trades: Technical: heating, ventilation, air conditioning, plumbing, electricity, civil engineering (painting, roofing, glazing, blinds, fencing, masonry etc.), passenger and goods lifts, automatic and powered doors, kitchen equipment, roads, signs, keys and locks, office furniture, Services: waste collection, security, green areas, cleaning and sanitary supplies, disinfection, rodent contro...

  4. Super Energy Savings Performance Contracts: Federal Energy Management Program (FEMP) Program Overview (revision)

    International Nuclear Information System (INIS)

    Pitchford, P.

    2001-01-01

    This four-page publication describes the U.S. Department of Energy's (DOE's) streamlined energy savings performance contracting, or ''Super ESPC,'' process, which is managed by DOE's Federal Energy Management Program (FEMP). Under a Super ESPC, a qualifying energy service company (ESCO) from the private sector pays for energy efficiency improvements or advanced renewable energy technologies (e.g., photovoltaic systems, wind turbines, or geothermal heat pumps, among others) for a facility of a government agency. The ESCO is then repaid over time from the agency's resulting energy cost savings. Delivery orders under these contracts specify the level of performance (energy savings) and the repayment schedule; the contract term can be up to 25 years, although many Super ESPCs are for about 10 years or less

  5. A survey of innovative contracting for quality jobs and ecosystem management.

    Science.gov (United States)

    Cassandra Moseley

    2002-01-01

    This survey identifies and defines innovative contracting mechanisms developed in the Forest Service Pacific Northwest Region and northern California. A survey of nine case studies reveals that several new mechanisms have facilitated ecosystem management, quality jobs, and administrative efficiencies, but at times innovation was hampered by Forest Service institutional...

  6. Review of the Literature on the Changing Psychological Contract: Implications on Career Management and Organizations

    Science.gov (United States)

    Lessner, Ryan; Akdere, Mesut

    2008-01-01

    The changing psychological contract has become a focus for organizational development, especially as job roles within organizations continue to change. This literature review examines the evolving employee-employer relationship and how this relationship has impacted career management and organizations for over the past century. The paper…

  7. 76 FR 76811 - Stakeholders Meeting Regarding Ready Reserve Force (RRF) Ship Manager Contract Program

    Science.gov (United States)

    2011-12-08

    ... Owner/Operator requirement. 12-ship award limit. Definition of Ship Manager ``business entity..., Maritime Security Program, or Tanker Emergency Preparedness Agreement. Small business, sub-contracting vs... affiliation to Rilla Gaither at [email protected] by close of business Monday, December 5, 2011. DATES...

  8. Green virtual enterprise breeding environments bag of assets management : A contribution to the sharing economy

    NARCIS (Netherlands)

    Romero, D.; Noran, O.; Afsarmanesh, H.; Camarinha-Matos, L.M.; Bénaben, F.; Picard, W.

    2015-01-01

    Green Virtual Enterprise Breeding Environments (GVBEs) are longterm strategic alliances of green enterprises and their related support institutions aimed at offering the necessary conditions to efficiently promote and establish common working and sharing principles with the intention of creating

  9. Report of the advisory committee on the management and disposition of Ontario Hydro's contracts with non-utility generators

    International Nuclear Information System (INIS)

    Anon.

    1999-01-01

    The report from the advisory committee on the management and disposition of Ontario Hydro's contracts with non-utility generators on the future management and disposition of the power purchase agreements entered into by Ontario Hydro with each non-utility generator (a NUG) is discussed. The integration of NUG contracts into a restructured competitive electricity market, the complexity of the contracts and the disparity of size, resources and approach to the integration exercise of the NUGs produces to an array of challenging issues. The committee identified three alternative strategies for dealing with NUG contracts in Ontario. The first is to use the independent Electricity Market Operator as a purely passive contract holder and above-market cost collection agent. The second is to make the Ontario Electricity Financial Corporation (OEFC) the contract holder and use a commercially oriented manager to administer the NUG contracts. This would minimize above-market costs and to advise on buyouts, compute above-market costs as an amount based on the difference between estimated future contract payments and estimated future market revenues for NUG power and recover them from domestic customers as a part of a single pooled Competition Transfer Charge. The third is to make the OEFC the contract holder, use a commercially oriented manager to administer the NUG contracts, to minimize above-market costs and to advise on buyouts. The OEFC would compute above-market costs as an amount based on the difference between estimated future contract payments and estimated future market revenues for NUG power and recover them from domestic customers as a part of a pooled CTC. The IMO would be used to collect the above-market NUG contract part of the pooled CTC as agent of the contract holder, in a contract uplift that would, like the levy in the first strategy, be charged to wholesale market participants and be included in rates paid by domestic end-use customers.1

  10. Report on Allegation of Unsatisfactory Conditions Regarding Actions by the Defense Contract Management Agency, Earned Value Management Center

    Science.gov (United States)

    2010-07-28

    object ivity of Defen se Contract Management Agency to carry ou t its ea rn ed va lue managemen t oversight responsibilities; and DCMA Response: Non...Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302...Earned Value Management Center Director advised us that the 2-week time frame was “standard operating procedure” for performing compliance reviews at

  11. Health, safety, and environmental management system operation in contracting companies: A case study.

    Science.gov (United States)

    Nassiri, Parvin; Yarahmadi, Rasoul; Gholami, Pari Shafaei; Hamidi, Abdolamir; Mirkazemi, Roksana

    2016-05-03

    Systematic and cooperative interactions among parent industry and contractors are necessary for a successful health, safety, and environmental management system (HSE-MS). This study was conducted to evaluate the HSE-MS performance in contracting companies in one of the petrochemical industries in Iran during 2013. Managers of parent and contracting companies participated in this study. The data collection forms included 7 elements of an integrated HSE-MS (leadership and commitment; policy and strategic objectives; organization, resources, and documentation; evaluation and risk management; planning; implementation and monitoring; auditing and reviewing). The results showed that mean percentage of the total scores in seven elements of HSE-MS was 85.7% and 87.0% based on self-report and report of parent company, respectively. In conclusion, this study showed that HSE-MS was desirably functioning; however, improvement to ensure health and safety of workers is still required.

  12. [The Brazilian National Health Surveillance Agency performance evaluation at the management contract model].

    Science.gov (United States)

    Moreira, Elka Maltez de Miranda; Costa, Ediná Alves

    2010-11-01

    The Brazilian National Health Surveillance Agency (Anvisa) is supervised by the Ministry of Health by means of a management contract, a performance evaluation tool. This case study was aimed at describing and analyzing Anvisa's performance evaluation model based on the agency's institutional purpose, according to the following analytical categories: the management contract formalization, evaluation tools, evaluators and institutional performance. Semi-structured interviews and document analysis revealed that Anvisa signed only one management contract with the Ministry of Health in 1999, updated by four additive terms. The Collegiate Board of Directors and the Advisory Center for Strategic Management play the role of Anvisa's internal evaluators and an Assessing Committee, comprising the Ministry of Health, constitutes its external evaluator. Three phases were identified in the evaluation model: the structuring of the new management model (1999-2000), legitimation regarding the productive segment (2001-2004) and widespread legitimation (2005). The best performance was presented in 2000 (86.05%) and the worst in 2004 (40.00%). The evaluation model was shown to have contributed little towards the agency's institutional purpose and the effectiveness measurement of the implemented actions.

  13. The integrated supplier: key to cost management and multi-franchise capitation contracting.

    Science.gov (United States)

    Schuweiler, R C

    1996-05-01

    Capitation...most healthcare providers do not work under it, comprehend it, or even want it, yet supply capitation contracting seminars are popping up everywhere creating the feeling that the bandwagon is leaving, and it might be time to get on board. Not true. Supply capitation is not for all organizations. Capitation contracting is not easy and there are not many successful models to help the uninitiated. If a panacea is sought for reducing supply costs, capitation is only one component of a systematic strategy to reduce materiel costs. This article suggests a direction using the Group Health Materiel Management (Group Health Cooperative of Puget Sound, WA) experience as a point of reference. It advocates a systematic approach that focuses on expense reduction in: cost of goods, holding cost of inventory, labor cost associated with all materiel processes, distribution cost (transportation and par stock pick, pack, and replenishment), product utilization, variation in product standards, and waste stream byproducts. At Group Health (GH) these issues are primarily addressed through the use of: information systems, supplier certification/selection processes, group purchasing compliance, supply channel management, supply capitation contracting programs, standardization, and utilization management. Because of managed care organizational structure, Group Health Cooperative supply capitation contracting, as performed at GH, is discussed not as a quick fix solution but in the spirit of sharing our experience with others who may be considering it as a cost savings tactic in the context of a broad-based materiel management strategy. This article highlights the experiences of GH beginning with materiel management's business process assumptions toward multiple-franchise supply capitation.

  14. The contracting risks of nuclear power engineering and the risk management strategies

    International Nuclear Information System (INIS)

    Ding Shuying

    2010-01-01

    With the trend of professional operation on the nuclear power engineering (thereafter using NPE for short) construction, the companies specialized on NPE whole-contracting are established one after the other, the mode of NPE whole-contracting has been wide adopted domestically. As people always concern for the safety of nuclear power, the risks exposed to NPE contractors are also concerned with the operator, the NPE corporations and the society. Therefore, it is very meaningful to analyze on the risks exposed to NPE contractors and the strategies they should take, for it not only determines whether the NPE construction will be finished on time, but also related to sustainable development of the NPE contracting corporations. The main content of this paper includes the analysis on the features and advantages of NPE whole contracting, the major NPE contracting risks, such as nuclear safety risks, strategic risks, market risks, legal risks, financial risks and operation risks, and the strategies to prevent or to control these risks. The paper focuses on identifying those business processes which risks may frequently take place, and how to manage them, illustrating practice cases to explain the theory, in order to make reference to NPE corporations. (author)

  15. Contract Management Monitoring And Evaluation Of Ghana School Feeding Programme At Atwima Kwanwoma District

    Directory of Open Access Journals (Sweden)

    Andrews Osei Mensah

    2015-08-01

    Full Text Available Ghana School Feeding Programme was introduced at Atwima Kwanwoma District and other parts of the country in 2008 to alleviate hunger and to provide good nutrition for pupils in the public basic schools. Caterers were given contract to provide food to the school pupils on every school-going day under Ghana school feeding programme. Some years have lapsed and there is the need to look back and evaluate this programme taking into consideration the award and management of those contracts. The study also examined how the programme is monitored and evaluated. Data was collected from 80 respondents comprising 29 school pupils and 51 other actors through the use of questionnaire and interview guide It was realised that caterers who are well experience in catering services were awarded contracts based on their past experience and financial abilities through submission of their certificates but not necessarily through bidding. The main component of managing the caterers contract included monitoring payment of debt and problems solving as well as supervision through visiting the schools on quarterly basis. The programme has helped to increase enrolment and retaining pupils in school. It was found out that food giving to the pupils was not served on time not regularly bases and was not sufficient to the pupils as well. The health component of the programme has not been successful as expected. It is recommended that fruits and variety of foods need to be introduced together with de-worming the pupils.

  16. Using SCOR as a Supply Chain Management Framework for Government Agency Contract Requirements

    Science.gov (United States)

    Paxton, Joseph; Tucker, Brian

    2010-01-01

    This paper will present a model that uses the Supply-Chain Operations Reference (SCOR) model as a foundation for a framework to illustrate the information needed throughout a product lifecycle to support a healthy supply chain management function and the subsequent contract requirements to enable it. It will also show where in the supply chain the information must be extracted. The ongoing case study used to exemplify the model is NASA's (National Aeronautics and Space Administration) Ares I program for human spaceflight. Effective supply chain management and contract requirements are ongoing opportunities for continuous improvement within government agencies, specifically development of systems for human spaceflight operations. Multiple reports from the Government Accountability Office (GAO) reinforce this importance. The SCOR model is a framework for describing a supply chain with process building blocks and business activities. It provides a set of metrics for measuring supply chain performance and best practices for continuously improving. This paper expands the application of the SCOR to also provide the framework for defining information needed from different levels of the supply chain and at different phases of the lifecycle. These needs can be incorporated into contracts to enable more effective supply chain management. Depending on the phase of the lifecycle, effective supply chain management will require involvement from different levels of the organization and different levels of the supply chain.

  17. Optimal Management of Supply Disruptions when Contracting with Unreliable, Risk-averse, Suppliers

    OpenAIRE

    Parlane, Sarah; Tsai, Ying-Yi

    2017-01-01

    This paper investigates the optimal management of supply disruptions by a manufacturer who uses order inflation and/or investments in process reliability when contracting two risk-averse suppliers. We consider that these investments can be subject to moral hazard. Technically we solve a newsvendor optimization problem using a random capacity model of disruption. In such a model, the order size does not affect the average production but impacts the probability of disruption. When investments a...

  18. Commitments of Psychological Contracts and Diagnostic Use of Management Control Systems

    OpenAIRE

    Ivan Canan; Gilberto de Andrade Martins; Patrícia Oda

    2016-01-01

    Investigating the commitments the Surveillance Agents from the National Telecommunications Agency (Anatel) made in their psychological contracts and the diagnostic use of the management control system of the entity, this study tested the hypothesis that individuals tend to be more committed to aspects they are charged for within organizations. This is a theoretical and empirical study that assumed that the commitments comprise the part of the belief that individuals develop on reciprocal rela...

  19. Pan-European management of electricity portfolios: Risks and opportunities of contract bundling

    International Nuclear Information System (INIS)

    Gampert, Markus; Madlener, Reinhard

    2011-01-01

    Due to the liberalization of energy markets in the European Union, today's European utilities not only focus on electricity supply, but also offer exchange-traded 'structured products' or portfolio management for unbundling financial and physical risk positions. Many utilities are only able to provide these services in their domestic markets. In a globalized economy, the need for a centrally organized pan-European portfolio management has arisen, as it allows a simplified commodity sourcing in combination with an optimized risk management. In this paper, we examine the challenges to be overcome for establishing a European-wide bundling of electricity contracts. For this purpose, a case study based on the business perspective of RWE Supply and Trading in Central and Eastern Europe is carried out. In a first step, we analyze general requirements for a pan-European bundling of electricity contracts. Then, RWE's situation in Europe is examined, based on which we finally propose a concept to meet customer demands in Central and Eastern Europe. - Research highlights: → Analysis of electricity market liberalization in Central and Eastern Europe. → Identification of requirements and problems for pan-European bundling of contracts. → Case study based on RWE Supply and Trading perspective in Central and Eastern Europe. → Model development for pan-European unbundling of financial/physical risk positions.

  20. Implementation of the best in class project management and contract management initiative at the Department Of Energy's Office Of Environmental Management - 16062

    International Nuclear Information System (INIS)

    Van Camp, Scott G.; Stevenson, Jeremy S.; Deiters, Michael G.; Jamison, Timothy P.

    2009-01-01

    Since its creation in 1989, the Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project management and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. EM has committed itself to improving project performance and undertaken a number of proactive management initiatives including the development of a 'Best in Class' Project Management and Contract Management organization (i.e., the BICPM Initiative). During 2007, EM assessed the status of project management and contract management at 15 EM sites. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and three contract management benchmarks. The January 2008 Compilation Assessment Report showed that EM faces significant challenges in its mission execution due to staffing shortages, project and contract management integration, insufficient project-oriented culture, and lack of a clear role for Headquarters in BICPM. EM then formulated a strategy to meet their objectives in the March 2008 Corporate Implementation Plan. It summarizes BICPM efforts, introduces the vision for BICPM, identifies the strategy for achieving BICPM, and describes a process for implementing BICPM. That is, it acts as a road-map to address EM's challenges. It also documents 18 Recommended Priority Actions (RPAs) that are the key to correcting these challenges. These RPAs provide a clear path forward that can be communicated to the entire EM organization and provide the foundation upon which a BICPM culture can be built. EM has since gained considerable momentum and progress towards institutionalizing BICPM. This paper provides a discussion of the BICPM Initiative and its implementation. (authors)

  1. Two staged incentive contract focused on efficiency and innovation matching in critical chain project management

    Directory of Open Access Journals (Sweden)

    Min Zhang

    2014-09-01

    Full Text Available Purpose: The purpose of this paper is to define the relative optimal incentive contract to effectively encourage employees to improve work efficiency while actively implementing innovative behavior. Design/methodology/approach: This paper analyzes a two staged incentive contract coordinated with efficiency and innovation in Critical Chain Project Management using learning real options, based on principle-agent theory. The situational experiment is used to analyze the validity of the basic model. Finding: The two staged incentive scheme is more suitable for employees to create and implement learning real options, which will throw themselves into innovation process efficiently in Critical Chain Project Management. We prove that the combination of tolerance for early failure and reward for long-term success is effective in motivating innovation. Research limitations/implications: We do not include the individual characteristics of uncertain perception, which might affect the consistency of external validity. The basic model and the experiment design need to improve. Practical Implications: The project managers should pay closer attention to early innovation behavior and monitoring feedback of competition time in the implementation of Critical Chain Project Management. Originality/value: The central contribution of this paper is the theoretical and experimental analysis of incentive schemes for innovation in Critical Chain Project Management using the principal-agent theory, to encourage the completion of CCPM methods as well as imitative free-riding on the creative ideas of other members in the team.

  2. Carcass yield traits of kids from a complete diallel of Boer, Kiko, and Spanish meat goat breeds semi-intensively managed on humid subtropical pasture.

    Science.gov (United States)

    Browning, R; Phelps, O; Chisley, C; Getz, W R; Hollis, T; Leite-Browning, M L

    2012-03-01

    Bucklings (n = 275) from a complete diallel of Boer, Kiko, and Spanish meat goats were slaughtered at 7 mo of age (4 mo postweaning) to evaluate genetic effects on carcass yield. Breed of sire did not affect (P > 0.05) live, carcass, and primal weights. Conversely, breed of dam was a consistently significant source of variation for carcass weight traits. Kiko dams produced kids with heavier (P 0.05) from Boer or Kiko. Subjective conformation scores for muscularity were affected (P 0.05) by breeds of sire or dam. Direct effects of Boer were negative for carcass weight, dressing percent, and shoulder weight and positive for proportional leg weight. Direct effects of Kiko were positive for carcass weight and shoulder weight and negative for proportional leg weight. Direct effects of Spanish did not differ (P > 0.10) from 0 for any trait tested. Heterosis levels were similar among breed pairings. Heterosis was substantial (P ≤ 0.05) for live, carcass, and primal weights (5 to 9%) but not for dressing percent, proportional boneless meat yield, or primal weight proportions (genetic variation was observed among goat breeds for carcass yield traits. Dam breed was more influential than sire breed. Boer germplasm was not superior to Kiko or Spanish germplasm for carcass yield when semi-intensively managed on humid, subtropical pasture. Results emphasize the importance of comparative breed evaluations to provide industry with reliable information on carcass yield among goat genotypes.

  3. A decision-making framework to integrate maintenance contract conditions with critical spares management

    International Nuclear Information System (INIS)

    Godoy, David R.; Pascual, Rodrigo; Knights, Peter

    2014-01-01

    Maintenance outsourcing is a strategic driver for asset intensive industries pursuing to enhance supply chain performance. Spare parts management plays a relevant role in this premise since its significant impact on equipment availability, and hence on business success. Designing critical spares policies might therefore seriously affect maintenance contracts profitability, yet service receivers and external providers traditionally attempt to benefit separately. To coordinate both chain parties, we investigated whether the spare components pool should be managed in-house or contracted out. This paper provides a decision-making framework to efficiently integrate contractual conditions with critical spares stockholding. Using an imperfect maintenance strategy over a finite horizon, the scheme maximizes chain returns whilst evaluating the impact of an additional part to stock. As result, an original joint value – preventive interval and stock level – sets the optimal agreement to profitably allocate the components pool within the service contract. Subsidization bonuses on preventive interventions and pooling costs are also estimated to induce the service provider to adjust its policy when needed. The proposed contractual conditions motivate stakeholders to continuously improve maintenance performance and supply practices, thus obtaining higher joint benefits

  4. Report: Policies Needed for Proper Use and Management of Cost-Reimbursement Contracts Based on Duncan Hunter Act

    Science.gov (United States)

    Report #12-P-0320, March 6, 2012. EPA did not comply with several key revisions to the FAR as amended by the interim rule, Proper Use and Management of Cost Reimbursement Contracts (FAR Case 2008-030).

  5. A Study of the Effects of Gas Well Compressor Noise on Breeding Bird Populations of the Rattlesnake Canyon Habitat Management Area, San Juan County, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    LaGory, K.E.; Chang, Young-Soo; Chun, K.C.; Reeves, T.; Liebich, R.; Smith, K.

    2001-06-04

    This report, conducted from May through July 2000, addressed the potential effect of compressor noise on breeding birds in gas-production areas administered by the FFO, specifically in the Rattlesnake Canyon Habitat Management Area northeast of Farmington, New Mexico. The study was designed to quantify and characterize noise output from these compressors and to determine if compressor noise affected bird populations in adjacent habitat during the breeding season.

  6. Managing water utility financial risks through third-party index insurance contracts

    Science.gov (United States)

    Zeff, Harrison B.; Characklis, Gregory W.

    2013-08-01

    As developing new supply capacity has become increasingly expensive and difficult to permit (i.e., regulatory approval), utilities have become more reliant on temporary demand management programs, such as outdoor water use restrictions, for ensuring reliability during drought. However, a significant fraction of water utility income is often derived from the volumetric sale of water, and such restrictions can lead to substantial revenue losses. Given that many utilities set prices at levels commensurate with recovering costs, these revenue losses can leave them financially vulnerable to budgetary shortfalls. This work explores approaches for mitigating drought-related revenue losses through the use of third-party financial insurance contracts based on streamflow indices. Two different types of contracts are developed, and their efficacy is compared against two more traditional forms of financial hedging used by water utilities: Drought surcharges and contingency funds (i.e., self-insurance). Strategies involving each of these approaches, as well as their use in combination, are applied under conditions facing the water utility serving Durham, North Carolina. A multireservoir model provides information on the scale and timing of droughts, and the financial effects of these events are simulated using detailed data derived from utility billing records. Results suggest that third-party index insurance contracts, either independently or in combination with more traditional hedging tools, can provide an effective means of reducing a utility's financial vulnerability to drought.

  7. Coalition contract management as a systems change strategy for HIV prevention.

    Science.gov (United States)

    Darrow, William W; Montanea, Julie E; Sánchez-Braña, Elizabeth

    2010-11-01

    Racial and Ethnic Approaches to Community Health (REACH) 2010 provided a unique opportunity for minority community-based organizations (CBOs) to work together to eliminate disparities in HIV disease. A coalition was formed in Broward County to respond to the REACH 2010 program announcement, a university was chosen to coordinate efforts, and contracts were negotiated with CBO partners to develop, implement, and evaluate a community action plan. Contract management provided stability, focus, and a mechanism for coalition partners to measure progress toward achieving project objectives. By emphasizing documentation as well as the delivery of services, however, contract conditions also placed a heavy burden on educational outreach workers, restricted the reimbursable activities of member organizations, and created friction between minority agencies and university staff. Although the coalition met many of its objectives, the introduction and enforcement of a mutually agreed on set of rules and obligations as a way of promoting systems change in Broward County failed to make a lasting impact among community partners. CBOs continued to compete with one another for HIV prevention project funding and stopped collaborating as closely with another when federal support for our REACH 2010 community demonstration project ran out.

  8. River Protection Project: Interface Management in the Multi Contract Project Environment at Hanford

    International Nuclear Information System (INIS)

    SHIKASHIO, L.A.

    2000-01-01

    The Office of River Protection (ORP) is implementing the River Protection Project (RPP) using two prime contractors. CH2M Hill Hanford Group, Inc. (CHG) is responsible for operating the existing tank system, delivering the waste feed to the waste treatment plant, and managing the resulting low- and high-level glass waste ''product'' through a performance-based fee type contract. A separate prime contractor will be responsible for designing, constructing and commissioning of a new Waste Treatment and Immobilization Plant (WTP), and preparing the waste for ultimate disposal. In addition to the prime contractors and their interfaces, the River Protection Project is being conducted on the Hanford Site, which is under the management of another DOE organization, DOE Richland Field Office (DOE-RL). The infrastructure and utilities are provided by DOE-RL, for example. In addition, there are multiple other technical interfaces with federal, state and other regulatory agencies that influence the management of the activities. This paper provides an overview of the approach employed by ORP to identify, coordinate, and manage the technical interfaces of RPP. In addition, this paper describes the approach and methodologies used to: Establish an overall framework for interface management. Establish the requirements for defining and managing interfaces for the prime contractors and DOE. Contractually requiring the prime contractors to control and manage the interfaces

  9. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    International Nuclear Information System (INIS)

    Gelles, C. M.; Sheppard, F. R.

    2002-01-01

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program

  10. Contract-Based Transaction Management in Cross-Organizational Workflow Management

    NARCIS (Netherlands)

    Grefen, P.W.P.J.

    Cross-organizational workflow management is an essential ingredient for process integration in virtual enterprises. To obtain cross-organizational workflow processes with robust semantics, these processes should be supported by highlevel cross-organizational transaction management. In this context,

  11. Breeding approaches for crenate broomrape (Orobanche crenata Forsk.) management in pea (Pisum sativum L.).

    Science.gov (United States)

    Rubiales, Diego; Fernández-Aparicio, Monica; Pérez-de-Luque, Alejandro; Castillejo, Mari A; Prats, Elena; Sillero, Josefina C; Rispail, Nicolas; Fondevilla, Sara

    2009-05-01

    Pea cultivation is strongly hampered in Mediterranean and Middle East farming systems by the occurrence of Orobanche crenata Forsk. Strategies of control have been developed, but only marginal successes have been achieved. Most control methods are either unfeasible, uneconomical, hard to achieve or result in incomplete protection. The integration of several control measures is the most desirable strategy. [corrected] Recent developments in control are presented and re-evaluated in light of recent developments in crop breeding and molecular genetics. These developments are placed within a framework that is compatible with current agronomic practices. The current focus in applied breeding is leveraging biotechnological tools to develop more and better markers to speed up the delivery of improved cultivars to the farmer. To date, however, progress in marker development and delivery of useful markers has been slow. The application of knowledge gained from basic genomic research and genetic engineering will contribute to more rapid pea improvement for resistance against O. crenata and/or the herbicide.

  12. Birth to weaning kid traits from a complete diallel of Boer, Kiko, and Spanish meat goat breeds semi-intensively managed on humid subtropical pasture.

    Science.gov (United States)

    Browning, R; Leite-Browning, M L

    2011-09-01

    Boer, Kiko, and Spanish meat goats were semi-intensively managed in a complete 3-breed diallel mating scheme to evaluate genetic effects on preweaning kid performance. Over a 6-yr period, 1,547 kids were born in March and May with 1,173 kids raised by their dams to weaning at 3 mo of age. March-born kids were lighter (P 0.10). Maternal Boer effects were negative (P 0.5) for preweaning ADG or weaning weight. Heterosis for birth weight was exhibited (P genetic variation was observed between meat goat breeds for kid performance to weaning. Maternal breed effects were more influential than direct breed effects. Boer goats were not superior to Kiko or Spanish for preweaning kid performance when semi-intensively managed on humid, subtropical pasture. Kiko should be a preferred breed and to a lesser extent Spanish for enhancing birth to weaning kid performance. Findings of this study emphasize the importance of proper doe breed selection in achieving desired kid performance to weaning in meat goats.

  13. Learning in a self-managed management career : the relation between managers' HRD-patterns, psychological career contracts and mobility perpectives

    NARCIS (Netherlands)

    Lankhuijzen, E.S.K.

    2002-01-01

    This thesis focuses on the significance of managers HRD-activities (learning activities) in modern career contexts. Based on literature study and several pre-studies, a conceptual research model was developed containing three main elements: HRD-pattern, psychological career contract and mobility

  14. The evolving local social contract for managing climate and disaster risk in Vietnam.

    Science.gov (United States)

    Christoplos, Ian; Ngoan, Le Duc; Sen, Le Thi Hoa; Huong, Nguyen Thi Thanh; Lindegaard, Lily Salloum

    2017-07-01

    How do disasters shape local government legitimacy in relation to managing climate- and disaster-related risks? This paper looks at how local authorities in Central Vietnam perceive their social contract for risk reduction, including the partial merging of responsibilities for disaster risk management with new plans for and investments in climate change adaptation and broader socioeconomic development. The findings indicate that extreme floods and storms constitute critical junctures that stimulate genuine institutional change. Local officials are proud of their strengthened role in disaster response and they are eager to boost investment in infrastructure. They have struggled to reinforce their legitimacy among their constituents, but given the shifting roles of the state, private sector, and civil society, and the undiminished emphasis on high-risk development models, their responsibilities for responding to emerging climate change scenarios are increasingly nebulous. The past basis for legitimacy is no longer valid, but tomorrow's social contract is not yet defined. © 2017 The Author(s). Disasters © Overseas Development Institute, 2017.

  15. Analysis of Effective Broodstock Management and Breeding of Patin Siam (Pangasius hypophthalmus in BBAT Jambi

    Directory of Open Access Journals (Sweden)

    Mimid A. Hamid

    2009-01-01

    Full Text Available Aiming to analyze biological character of reproduction and to realize effective breeding activity, annual patin breeding activity 2006 was examined in JFADC Indonesia. Females of two generations, strain of 2001 and 2003 were induced during the year.  Various parameters, such as body weight, collected egg weight, number of 1g egg, harvested larvae, were recorded in every trial of breeding. After collecting all of data in 2006, correlation of productivity with fish size and age were analyzed integrating data. All female were also identified by using PIT tag system and alteration of maturity was monitored monthly, observing development of abdomen, from January to June. Accumulated parameters during the year showed negative correlation of egg somatic index (ESI with fish body weight.  Furthermore, hatching rate showed declined tendency as increasing body weight, suggesting less productivity by too-big female. All of elder female performed low productivity due to the low reading of some parameters such as ESI, hatching rate, larvae number/kg. Proportion of matured female was quite high from January until April. Individual monitoring of maturation showed quick reproduction of gonad in 2 month, from January to March, suggesting active reproductive stimulation on this season. Other many females also performed high gonadal maturity and its duration until April in many case. However, maturation has decreased suddenly on May and low maturation had lasted until November. It suppose due to the seasonal alteration of precipitation and remains as awkward issue for stable patin production in Jambi. Keywords: breeding, Asian catfish, egg somatic index, maturation   ABSTRAK Evaluasi kegiatan pembenihan patin siam Tahun 2006 di BBAT Jambi Indonesia dilakukan dengan tujuan untuk analisa karakter biologi reproduksi ikan patin siam dan untuk mewujudkan kegiatan pembenihan yang efektif.  Betina  dari 2 generasi yaitu generasi 2001 dan 2003 dipijahkan selama Tahun

  16. Effects of food provisioning and habitat management on spatial behaviour of Little Owls during the breeding season

    DEFF Research Database (Denmark)

    Jacobsen, Lars Bo; Chrenkova, Monika; Sunde, Peter

    2016-01-01

    The population of Little Owls in Denmark is close to extinction. The main cause is food limitation during the breeding season. Efforts to improve breeding success include providing breeding pairs with supplementary food and attempts to improve foraging habitats by creating short grass areas near ...... reproductive output in an endangered raptor, but also to decreased working effort, which in turn may improve adult survival....

  17. Slave Breeding

    OpenAIRE

    Sutch, Richard

    1986-01-01

    This paper reviews the historical work on slave breeding in the ante-bellum United States. Slave breeding consisted of interference in the sexual life of slaves by their owners with the intent and result of increasing the number of slave children born. The weight of evidence suggests that slave breeding occurred in sufficient force to raise the rate of growth of the American slave population despite evidence that only a minority of slave-owners engaged in such practices.

  18. Environmental management through sluice gated bed-dam: a revived strategy for the control of Anopheles fluviatilis breeding in streams

    Science.gov (United States)

    Sahu, S.S.; Gunasekaran, K.; Jambulingam, P.

    2014-01-01

    Background & objectives: Integrated vector management (IVM) emphasizes sustainable eco-friendly methods and minimal use of chemicals. In this context, the present study highlights the environmental control of breeding of Anopheles fluviatilis, the primary malaria vector, through water management in a natural stream in Koraput district, Odisha, India. Methods: The District Rural Development Agency (DRDA), Koraput, constructed two bed-dams across streams, one in Barigaon and the other in Pipalapodar village. The bed-dam in the former village was fitted with two sluice gates whereas the bed dam constructed in the latter village was without the sluice gate. The sluice gates were opened once in a week on a fixed day to flush out the water from the dam. Anopheles immatures were sampled systematically in the streams using a dipper for density measurement and species composition. Results: There was a reduction of 84.9 per cent in the proportion of positive dips for Anopheles larvae/pupae and a reduction of 98.4 per cent in immature density (number/dip) of An. fluviatilis in the experimental downstream compared to the control following opening of the sluice gates. Interpretation & conclusions: Our findins showed that opening of sluice gates of the bed-dam regularly once in a week resulted in the control of vector breeding in the downstream due to the flushing effect of the water released with a high flow from the bed-dam that stagnated water in the upstream. The outcome of the study encourages upscaling this measure to other areas, wherever feasible. PMID:25297364

  19. Management practices and performance of mergers and acquisitions in Pakistan: mediating role of psychological contract.

    Science.gov (United States)

    Bari, Muhammad Waseem; Fanchen, Meng; Baloch, Muhammad Awais

    2016-01-01

    The objective of this study is to examine the direct and indirect effect of management practices (procedural justice, coordination approach, communication system, integration strategy, and coping programs) on merger and acquisition (M&A) performance in the Pakistan banking industry. Psychological contract (PC) acts as a mediator between Management practices and M&A performance. The Present study distributes a structured questionnaire to 700 bank employees of different management cadres. The useful response rate is 76 % (536 employees). It uses PLS-SEM technique for data analysis. (1) procedural justice is a key strategy which has highly significant direct and indirect effect on M&A performance; however integration strategy and the communication system have an only direct effect. (2) PC performs partial mediation at different levels between management practices and M&A financial and non-financial performance. This study provides an effective solution to solve the soft issues during and post-M&A process. This is one of the few studies which effectively integrate the five constructs into a single framework to study their effects on M&A performance. Limitations and future research directions are presented in the last section of the study.

  20. Measurement and analysis of breeding index in the first mock-up core (XXII-1(65V)) for water-cooled breeder reactor at FCA. Contract research

    International Nuclear Information System (INIS)

    Fukushima, Masahiro; Okajima, Shigeaki; Andoh, Masaki; Yamane, Tsuyoshi; Kataoka, Masaharu

    2005-03-01

    Measurements and analyses of breeding index were performed in the FCA-XXII-1(65V) core simulating reduced-moderation lightwater reactor (RMWR) with void fraction 65% of moderator at Fast Critical Assembly (FCA). The measurement of the reaction rate ratio of 238 U capture to 235 U fission (C8/F5) was made by a foil activation technique using depleted and enriched uranium foils, and the reaction rate ratios of 239 Pu fission to 235 U fission (F9/F5) and 238 U fission to 235 U fission (F8/F5) were measured using absolutely calibrated fission chambers. Cell averaged reaction correction factors were derived by the Monte Carlo code (MVP) calculations with modeling the forms and positions of fission chambers and foils. Consequently, cell averaged reaction rate ratios were determined to be C8/F5 of 0.0916±1.4%, F9/F5 of 0.759±1.2% and F8/F5 of 0.0201±0.9%. Therefore, breeding index of C8/F9 was determined to be 0.121 ± 1.8%. The analyses were made by using the JFS-3-J3.2R group constant set which is generated from the JENDL-3.2 nuclear data library. The effective cross sections were calculated by the standard cell calculation code for fast reactor, SLAROM. Three-dimensional diffusion calculations by the CITATION code with 70-group structure have been performed to estimate the reaction rate ratios in the core center. Here, effective cross sections of fuel cells in the core center were obtained using the PEACO-X code with an ultra-fine group structure to consider self-shielding effect in the resonance energy range. Calculation to experiment ratios (C/E) of F9/F5 and F8/F5 were 1.02 and 1.03, respectively. These calculated values slightly overestimate the experimental one. The calculated value of C8/F5 overestimates the experimental one by about 6%. Consequently, the C/E value of C8/F9 was 1.03. The calculated value slightly overestimates the experimental one. The calculation code system developed for the thermal reactor, SRAC code system, was also used to analyze the

  1. Tree breeding as a forest management supplement - economical, sociological, and ecological considerations

    Science.gov (United States)

    Gordon White

    1973-01-01

    To set the stage for my remarks, I would like to tell a story I recently heard. The top management of a large corporation has just ordered installed two IBM machines in the accounting department. Two middle-aged men - the office manager and his assistant - received the news with some misgivings. They felt that things were progressing well in their office; the...

  2. A comparative analysis of quality management standards for contract research organisations in clinical trials.

    Science.gov (United States)

    Murray, Elizabeth; McAdam, Rodney

    2007-01-01

    This article compares and contrasts the main quality standards in the highly regulated pharmaceutical industry with specific focus on Good Clinical Practice (GCP), the standard for designing, conducting, recording and reporting clinical trials involving human participants. Comparison is made to ISO quality standards, which can be applied to all industries and types of organisation. The study is then narrowed to that of contract research organisations (CROs) involved in the conduct of clinical trials. The paper concludes that the ISO 9000 series of quality standards can act as a company-wide framework for quality management within such organisations by helping to direct quality efforts on a long-term basis without any loss of compliance. This study is valuable because comparative analysis in this domain is uncommon.

  3. Change management of mergers: the impact on NHS staff and their psychological contracts.

    Science.gov (United States)

    Cortvriend, Penny

    2004-08-01

    The NHS has experienced a significant amount of organisational change and restructuring, which has included numerous mergers and de-mergers, since the Labour party came to power in the UK in 1997. However, to date there has been little in the way of evaluation of such changes, particularly the impact of organisational restructuring on the staff involved. This paper examines the human aspect of a merger, and subsequent de-merger, within a primary care trust (PCT) in the North of England, using a focus group methodology. The findings demonstrate that leadership and management styles have a significant impact on staff experiencing such changes. In addition, the psychological contract can be damaged due to the impact of several factors, inducing exit or intention to leave. Employees experienced a constant cycle of change with little time for stabilisation or adjustment, leading to negativity and lowered motivation at times.

  4. Managing Projects with the Public, -bringing Partnering, Contracts and Financing together in Building Public Services

    DEFF Research Database (Denmark)

    Koch, Christian

    2004-01-01

    of opportunity shows that on the operational level the contractual, financial and skill basis for the project has to be mobilized, negotiated, partly stabilized and renegotiated. The participating actors thus have to develop a new set of skills in dealing with municipalities and managing operations in PPPs....... of projects have had trouble to develop. The paper views PPP as an interaction between an emergent governance frame and operational activities in the project. PPP is an element of a networked public sector and the paper takes a network and political process approach to the shaping of PPP in Denmark....... It is analysed how the governance frame for these type of projects constituted a window of opportunity in the late nineties for “sale and lease back” arrangements, combined with partnering and more traditional design-build contracts. A case of a municipality renewing its school services, exploiting this window...

  5. Effect of Contract Research Organization Bureaucracy in Clinical Trial Management: A Model From Lung Cancer.

    Science.gov (United States)

    Gobbini, Elisa; Pilotto, Sara; Pasello, Giulia; Polo, Valentina; Di Maio, Massimo; Arizio, Francesca; Galetta, Domenico; Petrillo, Patrizia; Chiari, Rita; Matocci, Roberta; Di Costanzo, Alessandro; Di Stefano, Teresa Severina; Aglietta, Massimo; Cagnazzo, Celeste; Sperduti, Isabella; Bria, Emilio; Novello, Silvia

    2018-03-01

    Contract research organization (CRO) support is largely included in clinical trial management, although its effect in terms of time savings and benefit has not yet been quantified. We performed a retrospective multicenter analysis of lung cancer trials to explore differences in term of trial activation timelines and accrual for studies with and without CRO involvement. Results regarding study timelines from feasibility data to first patient enrollment were collected from 7 Italian thoracic oncology departments. The final accruals (screened/enrolled patients) are reported. We considered CRO/sponsor-administered and CRO-free trials according to who was responsible for the management of the crucial setup phases. Of 113 trials, 62 (54.9%) were CRO-administered, 34 (30.1%) were sponsor-administered, and 17 (15.0%) were CRO-free. The median time from feasibility invitation to documentation obtainment was 151 days in the CRO-administered trials versus 128 in the sponsor-administered and 120 in the CRO-free trials. The time from document submission to contract signature was 142 days in the CRO-administered versus 128 in the sponsor-administered and 132 in the CRO-free trials. The time from global accrual opening to first patient enrollment was 247 days for the CRO-administered versus 194 in the sponsor-administered and 151 in the CRO-free trials. No significant differences were observed in terms of the median overall timeline: 21 months in the CRO-administered, 15 in the sponsor-administered, and 18 months in the CRO-free studies (P = .29). Although no statistically significant differences were identified, the results of our analysis support the idea that bureaucratic procedures might require more time in CRO-administered trials than in sponsor-administered and CRO-free studies. This bureaucratic delay could negatively affect Italian patients' screening and enrollment compared with other countries. Copyright © 2017 Elsevier Inc. All rights reserved.

  6. Snavelbehandeling in de kalkoenhouderij : alternatieven via fokkerij en bedrijfsmanagemrnt = Beak trimming in turkey production : alternatives by means of breeding and farm management

    NARCIS (Netherlands)

    Veldkamp, T.

    2010-01-01

    A literature review on effects of breeding and management on injurious pecking behaviour and cannibalism has been conducted. The combination of factors to avoid injurious behaviour is not clear and thus no good alternative to beak trimming of the upper beak in day-old turkey poults is available. If

  7. TVA nuclear power: Management of the nuclear program through personal services contracts

    International Nuclear Information System (INIS)

    1987-01-01

    Mr. Steven White, a retired admiral, is serving as manager of the TVA Office of Nuclear Power. GAO previously concluded that Mr. White's retention under contractual arrangements constituted the improper use of a personal services contract and represented a circumvention of the statutory ceiling on salary payments to TVA employees. This report finds that Mr. White's rate of pay is within the range of the salaries paid by a sample of nonfederal utilities to their top executives and is over two and a half times the average salary paid to executives who hold positions which appear to have responsibility for managing the utilities' power or nuclear power operations. GAO also found that (1) TVA's Office of Nuclear Power has employed an additional 25 persons since 1986 under arrangements similar to the employing arrangements of Mr. White and (2) TVA's Nuclear Safety Review staff no longer reports directly to the TVA Board of Directors and General Manager. It has relocated from Knoxville, Tennessee to Chattanooga, Tennessee

  8. FIDIC contracts: analysis of the impact of general and particular conditions on the financial risk management in Romanian infrastructure projects

    Directory of Open Access Journals (Sweden)

    Constanţa-Nicoleta Bodea

    2016-12-01

    Full Text Available Construction projects are characterized by risks and uncertainties mainly due to technical and economic complexity. Risk management is an important tool in making decisions involving the identification and reduction, avoidance or transfer risk and uncertainties consequences of events that occurs during project implementation. For this reason, the objective of the contract between the beneficiary and the contractor is the allocation of risk. The distribution of risk in contracts for the execution of construction works was and is an ongoing challenge faced by parties having a significant impact on the type of contract is used. On the one hand, the beneficiaries tend to transfer to the contractors as many of the project risks and uncertainties, on the other hand, the contractors look to exploit any weakness contract, so as to reduce their impact on the expected profit. One of the most important risks assumed by the contractor by signing the contract which is also increasingly common in the current economic situation is the reduced financial capacity to support the project. A purely legal or purely technical interpretation is not meant to describe the complexity of issues related to implementation of construction projects. For this reason the authors have adopted a multi-disciplinary approach, which includes the legal issues related to the nature of the contract, but also the financial and technical aspects of construction projects. The paper aims to analyze how special contract clauses can influence the implementation of construction projects and in particular the financial management of contractors. The authors propose a model for analyzing the impact of FIDIC contract conditions applied on a case study of five transport infrastructure projects.

  9. Reproductive pattern of local sheep in Egypt with special reference to the effects of breed, season and management

    International Nuclear Information System (INIS)

    Rakha, A.M.; Essawy, S.A.; El Azab, A.I.

    1988-01-01

    The effect of season on ovulation has been monitored in two local breeds of Egyptian ewes - the Barki (desert type), and the Rahmani (fat tailed Nile valley breed), by sequentially measuring cyclic changes in plasma progesterone concentration throughout a period of one year in the absence of any possible ram effect. The modal length of the ovulatory cycle was 17-18 days for both breeds, with the progesterone concentration peaking around day 11. No effect of season on progesterone concentration was apparent for the Barki breed but in the Rahmani, progesterone values were lower (P < 0.05) during the summer than during the autumn months. While the Barki have a restricted breeding season from June to November, the Rahmani have only a short period of anovulation within April. Thirty-three per cent of the Rahmani breed were identified as having cycled throughout the year. (author). 9 refs, 4 figs

  10. Managing urban wastewater in China: a survey of build-operate-transfer contracts

    NARCIS (Netherlands)

    Braadbaart, O.D.; Zhang, M.S.; Wang, Y.

    2009-01-01

    This paper reports on a nationwide field survey of wastewater plants under build-operate-transfer ( BOT) contracts in China. The survey yielded information on contracting parties, size, duration and location of 37 BOT contracts. The key findings are that municipal governments feature as first

  11. Optimal management of replacement heifers in a beef herd: a model for simultaneous optimization of rearing and breeding decisions.

    Science.gov (United States)

    Stygar, A H; Kristensen, A R; Makulska, J

    2014-08-01

    The aim of this study was to provide farmers an efficient tool for supporting optimal decisions in the beef heifer rearing process. The complexity of beef heifer management prompted the development of a model including decisions on the feeding level during prepuberty (age optimal rearing strategy was found by maximizing the total discounted net revenues from the predicted future productivity of the Polish Limousine heifers defined as the cumulative BW of calves born from a cow calved until the age of 5 yr, standardized on the 210th day of age. According to the modeled optimal policy, heifers fed during the whole rearing period at the ADG of 810 g/d and generally weaned after the maximum suckling period of 9 mo should already be bred at the age of 13.2 mo and BW constituting 55.6% of the average mature BW. Based on the optimal strategy, 52% of all heifers conceived from May to July and calved from February to April. This optimal rearing pattern resulted in an average net return of EUR 311.6 per pregnant heifer. It was found that the economic efficiency of beef operations can be improved by applying different herd management practices to those currently used in Poland. Breeding at 55.6% of the average mature BW, after a shorter and less expensive rearing period, resulted in an increase in the average net return per heifer by almost 18% compared to the conventional system, in which heifers were bred after attaining 65% of the mature BW. Extension of the rearing period by 2.5 mo (breeding at the age 15.7 mo), due to a prepubertal growth rate lowered by 200 g, reduced the average net return per heifer by 6.2% compared to the results obtained under the basic model assumptions. In the future, the model may also be extended to investigate additional aspects of the beef heifer development, such as the environmental impacts of various heifer management decisions.

  12. Payment contracts in a preventive health care system: a perspective from operations management.

    Science.gov (United States)

    Yaesoubi, Reza; Roberts, Stephen D

    2011-12-01

    We consider a health care system consisting of two noncooperative parties: a health purchaser (payer) and a health provider, where the interaction between the two parties is governed by a payment contract. We determine the contracts that coordinate the health purchaser-health provider relationship; i.e. the contracts that maximize the population's welfare while allowing each entity to optimize its own objective function. We show that under certain conditions (1) when the number of customers for a preventive medical intervention is verifiable, there exists a gate-keeping contract and a set of concave piecewise linear contracts that coordinate the system, and (2) when the number of customers is not verifiable, there exists a contract of bounded linear form and a set of incentive-feasible concave piecewise linear contracts that coordinate the system. Copyright © 2011 Elsevier B.V. All rights reserved.

  13. Management of Arrhythmias in Athletes: Atrial Fibrillation, Premature Ventricular Contractions, and Ventricular Tachycardia.

    Science.gov (United States)

    Lai, Ernest; Chung, Eugene H

    2017-10-09

    Management of atrial fibrillation, premature ventricular contractions, and ventricular tachycardia without underlying cardiac disease or arrhythmogenic conditions differs in athletes from the general population. Athletes tend to be younger, healthier individuals with few comorbidities. Therapies that work well in the general population may not be appropriate or preferable for athletes. Management strategies include deconditioning, pharmacologic therapy, such as rate control with β-blockers or non-dihydropyridine calcium channel blockers and rhythm control with class I or class III antiarrhythmic drugs, and catheter ablation. Deconditioning is not preferred by athletes because of lost playing time. Pharmacologic therapy is well tolerated among most individuals, but is not as favorable in athletes. Rate control medications can reduce performance and β-blockers, in particular, are prohibited in many sports. Antiarrhythmic drugs are preferred over rate control with athletes, but many, especially younger athletes, may not like the idea of long-term medical therapy. Catheter ablation has been proven to be safe and efficacious, may eliminate the need for long-term medical therapy, and is supported by the major societies (AHA, ACC, ESC).

  14. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Energy Technology Data Exchange (ETDEWEB)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  15. Virtual Leadership: The Influence of Transformational Leadership Style on Employee Satisfaction at the Defense Contract Management Agency

    Science.gov (United States)

    Johnson, Kevin A.

    2012-01-01

    The purpose of this quantitative correlational study was to examine the possible relationship between transformational leadership style behaviors and the influence it had on employee satisfaction. The information presented in this study involved virtual team members at the Defense Contract Management Agency, Navy Special Emphasis Operations. The…

  16. Suicide Prevention: Critical Elements for Managing Suicidal Clients and Counselor Liability Without the Use of a No-Suicide Contract

    Science.gov (United States)

    Lee, Jeane B.; Bartlett, Mary L.

    2005-01-01

    Despite its entrenchment as a standard of practice, no-suicide contracts fail to achieve their purpose as an effective part of treatment or as an effective method of inoculating counselors against potential lawsuits should a client commit suicide. Critical elements for managing suicidal clients and counselor liability without reliance on the…

  17. Variation in broccoli cultivar phytochemical content under organic and conventional management systems: implications in breeding for nutrition.

    Science.gov (United States)

    Renaud, Erica N C; Lammerts van Bueren, Edith T; Myers, James R; Paulo, Maria João; van Eeuwijk, Fred A; Zhu, Ning; Juvik, John A

    2014-01-01

    Organic agriculture requires cultivars that can adapt to organic crop management systems without the use of synthetic pesticides as well as genotypes with improved nutritional value. The aim of this study encompassing 16 experiments was to compare 23 broccoli cultivars for the content of phytochemicals associated with health promotion grown under organic and conventional management in spring and fall plantings in two broccoli growing regions in the US (Oregon and Maine). The phytochemicals quantified included: glucosinolates (glucoraphanin, glucobrassicin, neoglucobrassin), tocopherols (δ-, γ-, α-tocopherol) and carotenoids (lutein, zeaxanthin, β-carotene). For glucoraphanin (17.5%) and lutein (13%), genotype was the major source of total variation; for glucobrassicin, region (36%) and the interaction of location and season (27.5%); and for neoglucobrassicin, both genotype (36.8%) and its interactions (34.4%) with season were important. For δ- and γ-tocopherols, season played the largest role in the total variation followed by location and genotype; for total carotenoids, genotype (8.41-13.03%) was the largest source of variation and its interactions with location and season. Overall, phytochemicals were not significantly influenced by management system. We observed that the cultivars with the highest concentrations of glucoraphanin had the lowest for glucobrassicin and neoglucobrassicin. The genotypes with high concentrations of glucobrassicin and neoglucobrassicin were the same cultivars and were early maturing F1 hybrids. Cultivars highest in tocopherols and carotenoids were open pollinated or early maturing F1 hybrids. We identified distinct locations and seasons where phytochemical performance was higher for each compound. Correlations among horticulture traits and phytochemicals demonstrated that glucoraphanin was negatively correlated with the carotenoids and the carotenoids were correlated with one another. Little or no association between

  18. Variation in Broccoli Cultivar Phytochemical Content under Organic and Conventional Management Systems: Implications in Breeding for Nutrition

    Science.gov (United States)

    Renaud, Erica N. C.; Lammerts van Bueren, Edith T.; Myers, James R.; Paulo, Maria João; van Eeuwijk, Fred A.; Zhu, Ning; Juvik, John A.

    2014-01-01

    Organic agriculture requires cultivars that can adapt to organic crop management systems without the use of synthetic pesticides as well as genotypes with improved nutritional value. The aim of this study encompassing 16 experiments was to compare 23 broccoli cultivars for the content of phytochemicals associated with health promotion grown under organic and conventional management in spring and fall plantings in two broccoli growing regions in the US (Oregon and Maine). The phytochemicals quantified included: glucosinolates (glucoraphanin, glucobrassicin, neoglucobrassin), tocopherols (δ-, γ-, α-tocopherol) and carotenoids (lutein, zeaxanthin, β-carotene). For glucoraphanin (17.5%) and lutein (13%), genotype was the major source of total variation; for glucobrassicin, region (36%) and the interaction of location and season (27.5%); and for neoglucobrassicin, both genotype (36.8%) and its interactions (34.4%) with season were important. For δ- and γ- tocopherols, season played the largest role in the total variation followed by location and genotype; for total carotenoids, genotype (8.41–13.03%) was the largest source of variation and its interactions with location and season. Overall, phytochemicals were not significantly influenced by management system. We observed that the cultivars with the highest concentrations of glucoraphanin had the lowest for glucobrassicin and neoglucobrassicin. The genotypes with high concentrations of glucobrassicin and neoglucobrassicin were the same cultivars and were early maturing F1 hybrids. Cultivars highest in tocopherols and carotenoids were open pollinated or early maturing F1 hybrids. We identified distinct locations and seasons where phytochemical performance was higher for each compound. Correlations among horticulture traits and phytochemicals demonstrated that glucoraphanin was negatively correlated with the carotenoids and the carotenoids were correlated with one another. Little or no association between

  19. The politics of establishing catchment management agencies in South Africa: the case of the Breede-Overberg catchment management agency

    CSIR Research Space (South Africa)

    Meissner, Richard

    2016-01-01

    Full Text Available (BGCMA). We do so by applying the framework of adaptive comanagement and its institutional prescriptions: collaboration, experimentation, and a bioregional approach. We start by introducing the history of this catchment management agency (CMA...

  20. The current state of Contract Law in Australia and why it is important for rural managers to understand it

    OpenAIRE

    Smith, Tony

    2011-01-01

    Farmers are business managers and as such they must understand the law or they are likely to fall foul of it. This especially applies to contract law, with which they deal constantly. Contract law is made up of the common law – as the courts have decided it – and statute law- as the state and federal parliaments have enacted statutes which modify the common law. The most important and most recent of the latter is the new Australian Consumer Law.

  1. A review of the reproductive biology and breeding management of tapirs.

    Science.gov (United States)

    Pukazhenthi, Budhan; Quse, Viviana; Hoyer, Mark; van Engeldorp Gastelaars, Heleen; Sanjur, Oris; Brown, Janine L

    2013-03-01

    Tapirs (Tapirus sp.) have been studied extensively in the wild, yet little is known about their fundamental reproductive biology, information that is critical to establishing self-sustaining populations in captivity as a hedge against extinction. This paper reviews information on the reproductive biology of the 4 species of tapirs: Baird's (Tapirus bairdii), lowland (T terrestris), mountain (T pinchaque) and Malayan (T indicus). Both sexes reach puberty between 14 and 48 months of age. Behaviorally, tapirs display few overt signs of estrus, and external signs of pregnancy are not evident until approximately 2 months before parturition. Immunoassay techniques to measure reproductive hormones in blood and urine have been validated for tapirs, which allow monitoring of ovarian cycle activity and pregnancy. Data indicate that females are polyestrous, with an estrous cycle length of approximately 30 days. The exception is the Malayan tapir, which exhibits 2 types of cycles: short (approximately 1 month) and long (approximately 2 months). Gestation length is approximately 13 months and females can conceive at the first post-partum cycle within 1 month after birth. Good quality ejaculates have been obtained via electroejaculation in the Baird's and Malayan tapir and the sperm from Baird's tapir cryopreserved using standard cryodiluents, although more work is needed to optimize these protocols. Given that all 4 species of tapir most likely will continue to be maintained in captivity, effective genetic management is vital for long-term survival. Optimization of assisted reproductive technologies, including sperm cryopreservation and artificial insemination, could benefit the genetic management of tapirs. © 2012 Wiley Publishing Asia Pty Ltd, ISZS and IOZ/CAS.

  2. The evolution of electricity prices in an uncertain world. Contracting and managing the price risk

    International Nuclear Information System (INIS)

    Vassilopoulos, Ph.; Rapin, D.

    2004-01-01

    With the liberalization of the electricity market, the large industrial consumers saw their electric bill changing nature. Before, this price reflected a long term negotiation with the monopoly, now it is established in a free way via wholesale markets. This evolution marks a transfer of the management of price risk from the producer towards the consumer. This change is not in itself a problem if the hedging instruments are adapted. We note a contamination of the price of the derivative products by the spot while at the same time the traditional relation between cash and term is not always valid for electricity because of its non storability. When well even the price of the derivative products would be formed in an autonomous way, it poses a second problem: that of their indexing on price references like Platt's whose result is assimilated more to a survey of large producers than a true confrontation of supply and demand. This article proposes to examine this change of nature and behaviour of electricity prices. After having explained the intrinsically volatile characteristic of spot prices, we will recall that the products in the long term are not always optimal solutions to decrease this price risk. Lastly, we will highlight a solution of skirting at the risks mentioned above: contracting between producers and consumers. (authors)

  3. Transitioning from operations to environmental restoration: Startup of the Fernald Environmental Restoration Management Contract

    International Nuclear Information System (INIS)

    Little, C.C.; Kozlowski, D.R.

    1993-10-01

    This paper will present a description of the program undertaken by the Fernald Environmental Restoration Management Contractor (ERMC) to effect a transition from operation of the Fernald site by the past M ampersand O contractor, WEMCO, to DOE's new mission and contractual approach focussed on site remediation. This transition, on a first of its kind contract, represented a significant, proactive approach on the part of DOE to pursue the clean up of its weapon's production facilities in a faster, more cost-effective manner. The paper will discuss the formal transition readiness review process and the lessons teamed by DOE and the contractor during transition. The oral presentation will be shared by both authors with one half of the time allocated to the transition readiness demonstration process and one half to the lessons learned. The objective of having a Department of Energy (DOE) Headquarters representative participate in the transition to the first ERMC was to develop a handbook to assist other sites proceeding with the ERMC concept, such as the Richland Operations Office, and to develop a lessons learned document. Because a lessons learned report is available separately, only those more significant lessons learned are highlighted in this paper

  4. Commitments of Psychological Contracts and Diagnostic Use of Management Control Systems

    Directory of Open Access Journals (Sweden)

    Ivan Canan

    2016-06-01

    Full Text Available Investigating the commitments the Surveillance Agents from the National Telecommunications Agency (Anatel made in their psychological contracts and the diagnostic use of the management control system of the entity, this study tested the hypothesis that individuals tend to be more committed to aspects they are charged for within organizations. This is a theoretical and empirical study that assumed that the commitments comprise the part of the belief that individuals develop on reciprocal relations of exchange between themselves and their contractors, in line with the model by Rousseau (1989; 1995. It was also assumed that the extent to which aspects are charged from the members of an organization matches their perception of the diagnostic use of formal and informal control systems. Methodologically, the research was developed in two phases, the first qualitative, involving documentary analysis and content analysis of organizational documents; and the second quantitative, with the application of questionnaires answered by individuals who occupy the individual position referred to in the organization, who evaluated behavioral parameters that act on them and that were identified in the first phase. The data showed that 42 respondents tend to maintain high levels of commitment to the rules and standards proposed for their function. Statistical results also suggest that there is a significant positive correlation between the commitments assumed and the perceived diagnostic use of control systems for the surveillance agents who answered the questionnaire.

  5. Distracted cervical spinal fusion for management of caudal cervical spondylomyelopathy in large-breed dogs

    Energy Technology Data Exchange (ETDEWEB)

    Ellison, G. W.; Seim, III, H. B.; Clemmons, R. M.

    1988-08-15

    Using an autogenous bone graft (obtained from the iliac crest), 4-mm cancellous bone screws, and polymethylmethacrylate, a distracted cervical spinal fusion technique was performed on 10 dogs with myelographic evidence of caudal cervical spondylomyelopathy. All dogs had evidence of dynamic soft tissue spinal cord compression, as indicated by flexion, extension, and traction myelographic views. Of the 10 dogs, 4 previously had undergone surgery by use of ventral slot or cervical disk fenestration techniques, and their neurologic status had deteriorated after the original surgery. Preoperative neurologic status of the 10 dogs included nonambulatory tetraparesis (n = 5), severe ataxia with conscious proprioceptive deficits (n = 2), and mild ambulatory ataxia with conscious proprioceptive deficits (n = 3). Five dogs had signs of various degrees of cervical pain. Clinical improvement was observed in 8 of 10 dogs--either improved neurologic status or elimination of cervical pain. Implant loosening developed in 3 dogs; 2 of them were euthanatized because of lack of neurologic improvement. Radiographic evidence of bony cervical fusion was observed during a 9- to 24-week period in 6 of the 8 surviving dogs. The distracted cervical fusion technique appears to be a valid surgical procedure to manage cervical spondylomyelopathy in those dogs in which the lesions are limited to one cervical intervertebral disk space.

  6. Distracted cervical spinal fusion for management of caudal cervical spondylomyelopathy in large-breed dogs

    International Nuclear Information System (INIS)

    Ellison, G.W.; Seim, H.B. III; Clemmons, R.M.

    1988-01-01

    Using an autogenous bone graft (obtained from the iliac crest), 4-mm cancellous bone screws, and polymethylmethacrylate, a distracted cervical spinal fusion technique was performed on 10 dogs with myelographic evidence of caudal cervical spondylomyelopathy. All dogs had evidence of dynamic soft tissue spinal cord compression, as indicated by flexion, extension, and traction myelographic views. Of the 10 dogs, 4 previously had undergone surgery by use of ventral slot or cervical disk fenestration techniques, and their neurologic status had deteriorated after the original surgery. Preoperative neurologic status of the 10 dogs included nonambulatory tetraparesis (n = 5), severe ataxia with conscious proprioceptive deficits (n = 2), and mild ambulatory ataxia with conscious proprioceptive deficits (n = 3). Five dogs had signs of various degrees of cervical pain. Clinical improvement was observed in 8 of 10 dogs--either improved neurologic status or elimination of cervical pain. Implant loosening developed in 3 dogs; 2 of them were euthanatized because of lack of neurologic improvement. Radiographic evidence of bony cervical fusion was observed during a 9- to 24-week period in 6 of the 8 surviving dogs. The distracted cervical fusion technique appears to be a valid surgical procedure to manage cervical spondylomyelopathy in those dogs in which the lesions are limited to one cervical intervertebral disk space

  7. The politics of establishing catchment management agencies in South Africa: the case of the Breede-Overberg catchment management agency

    CSIR Research Space (South Africa)

    Meissner, Richard

    2014-09-01

    Full Text Available in South Africa. We then reflect in section 8.5 on what can be surmised about BOCMA’s democratic functioning and performance, to date before concluding the chapter (section 8.6). 8.2THE BREEDE−OVERBERG CATCHMENT MANAGEMENT AGENCY 8.2.1 Authority rules CMAs are statutory bodies established in terms of the National Water Act and are able to develop their catchment management strategy. Democratic control is also exercised through the governing...

  8. The many outcomes from contracting out: The voice of public managers

    DEFF Research Database (Denmark)

    Lindholst, Andrej Christian; Hansen, Morten Balle; Randrup, Thomas Barfoed

    2018-01-01

    perspective is summarised in a best-case, worst-case and complex-case scenario highlighting the mix, complexities and trade-offs in a composite set of contracting outcomes. The nature of contracting outcomes as complex and composite rather than unidimensional is one key finding. Furthermore, the importance...

  9. Semen quality of Italian local pig breeds

    Directory of Open Access Journals (Sweden)

    G. Gandini

    2010-01-01

    Full Text Available From 1996 to 1999 a conservation programme was carried out within the framework of EC contract “European gene banking project for the pig genetic resources” (Ollivier et al., 2001 in the Italian local pig breeds. The aims of the program included the primary characterization of the breeds, i.e. information on the organization in charge of the breed, breeding population numbers, breed description and qualifications, and field trials on productive and reproductive performances. In this context the “Semen Bank of Italian local pig breeds” was built. A total of 30,835 straws of four Italian local pig breeds (Cinta Senese, Casertana, Mora Romagnola and Nero Siciliano, collected from 42 sires, have been stored. In this work semen quality traits, lipid composition and freezability of the four Italian local pig breeds are reported.

  10. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management To Safely And Effectively Complete Nuclear Construction Work

    International Nuclear Information System (INIS)

    Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  11. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  12. Professional services contract manager development and certification strategy : spr 696 : final report.

    Science.gov (United States)

    2013-02-27

    SCDOT hires many consultants to provide professional services in support of its planning, design, construction and : maintenance projects. SCDOT personnel responsible for procuring and administering these professional service : contracts, especially ...

  13. Managing hydroclimatological risk to water supply with option contracts and reservoir index insurance

    Science.gov (United States)

    Brown, Casey; Carriquiry, Miguel

    2007-11-01

    This paper explores the performance of a system of economic instruments designed to facilitate the reduction of hydroclimatologic variability-induced impacts on stakeholders of shared water supply. The system is composed of bulk water option contracts between urban water suppliers and agricultural users and insurance indexed on reservoir inflows. The insurance is designed to cover the financial needs of the water supplier in situations where the option is likely to be exercised. Insurance provides the irregularly needed funds for exercising the water options. The combined option contract - reservoir index insurance system creates risk sharing between sectors that is currently lacking in many shared water situations. Contracts are designed for a shared agriculture - urban water system in Metro Manila, Philippines, using optimization and Monte Carlo analysis. Observed reservoir inflows are used to simulate contract performance. Results indicate the option - insurance design effectively smooths water supply costs of hydrologic variability for both agriculture and urban water.

  14. Their grass is greener but ours is sweeter - thoroughbred breeding and water management in the Upper Hunter region of New South Wales, Australia

    Energy Technology Data Exchange (ETDEWEB)

    McManus, P. [University of Sydney, Sydney, NSW (Australia). School for Geoscience

    2008-05-15

    The Upper Hunter region (in New South Wales (NSW) around Scone is reputed to be the second most significant thoroughbred breeding region in the world after the Bluegrass region of Kentucky. This article identifies the importance and cultural constructions of grass, and hence water, in the thoroughbred breeding industry in this region. Thoroughbred stud managers attempt to produce environments attractive to potential horse purchasers and owners with mares to be mated. These environments are constructed from perceptions of how a thoroughbred stud should appear, and from the physical conditions of specific locations. One perception is that the grass should be green. There are differing opinions in the thoroughbred breeding industry about the nutritional value of irrigated grasses, the role of these grasses in horse development and the associated access to, cost of and efficacy of water used for this purpose. The paper concludes that effective water management in this industry is only possible if various cultures of nature are understood, where necessary challenged, and subsequently included in policy and planning.

  15. Store-Assistance Management for a Supply Chain with Consumer Return under Consignment Contract

    Directory of Open Access Journals (Sweden)

    Zhihui Wu

    2017-01-01

    Full Text Available In this paper, the strategy problems of pricing and store-assistance service investment are investigated for a supply chain with consumer return, where the considered supply chain under consignment contract consists of a single manufacturer and a single retailer. Firstly, we use differential equation to model the evolution of store-assistance service level and depict the effect of store-assistance service level on the return rate. By applying two-stage game, both optimal pricing and store-assistance service strategies are obtained based on the presented optimal control model. Subsequently, the committed dynamic consignment price contract is designed to coordinate and improve the performance of supply chain. Finally, a numerical example is provided to illustrate the impacts of the effectiveness of store-assistance service level and decay rate on the feasible region of corresponding contract.

  16. A Story of Three Bank-Regulatory Legal Systems: Contract, Financial Management Regulation and Fiduciary Law

    Directory of Open Access Journals (Sweden)

    Tamar Frankel

    2016-08-01

    Full Text Available How should banks be regulated to avoid their failure? Banks must control the risks they take with depositors' money. If depositors lose their trust in their banks, and demand their money, the banks will fail. This article describes three legal bank regulatory systems: Contract with depositors (U.S.; a mix of contract and trust law, but going towards trust (Japan and a full trust-fiduciary law regulating banks (Israel. The article concludes that bank regulation, which limits the banks' risks and conflicts of interest, helps create trustworthy banks that serve their country best.

  17. Effect of breed (wool and hair and sex on the carcass quality of suckling lambs under intensive management

    Directory of Open Access Journals (Sweden)

    Ángeles Camacho

    2013-12-01

    Full Text Available Carcasses of twenty lambs (10 males and 10 females from the Canaria Hair breed (CHB and another twenty (10 males and 10 females from the Canaria breed (CB of 9.91±0.73 kg and 9.87±0.80 kg live weight, respectively, were studied. In the principal component (PC analysis, the projection of carcass measurement data in the first PC allowed for clearly distinguishing between CB and CHB. In the analysis of variance, breed effect was observed in the morphology of the carcass: CB lambs showed the longest carcasses and CHB lambs showed the widest carcasses. Due to their wider rump and shorter legs, CHB lambs presented a more compact leg index. The carcasses from Canaria lambs had the highest fat score, the heaviest shoulder and the highest total fat percentage. The carcasses from CHB lambs showed a higher lean percentage. The carcass yield, conformation, degree of fatness and tissue composition were similar in both sexes. However, significant differences in the commercial cut yield were observed: males showed heavier shoulders than females. The effect of sex on carcass quality is unimportant. The breeds are different in important characteristics for the market, such as fatness. This fact is of significant interest because it diversifies the offer and means that different markets can be satisfied.

  18. Concept of contracting authority

    OpenAIRE

    Kasiliauskaitė, Vitalija

    2016-01-01

    Concept of Contracting Authority Law on Public Procurement the procurement concept implies the conclusion that public procurement be declared only such purchases are carried out by the contracting authority. The contracting authorities can be a subject of state and municipal management institutes, whose assignment authority is determined by a functional approach. Also, contracting authorities may be public and legal entities, but that the public interest and operates non-commercial activities...

  19. IAEA research contracts. Third annual report

    International Nuclear Information System (INIS)

    1963-01-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports in the field of Radioactive waste management and environmental research included are: Research Contract No.20. Studies in the uptake of radioisotopes by edible marine products; Research Contract No. 33, Behaviour of fission products in soil; Research Contract No.100, Ionic interaction near clay surfaces. Reports dealing with Health physics and radiation protection presented are: Research Contract No.14, The effect of radiation on plant cells and its modification with protective substances; Research Contract No.32, Determination of the enrichment factors of calcium isotopes on ion exchange resins and the investigation of the various systems of electrolytic separation; Research Contract No. 53, Selection of sulphydryl compounds for radiation protection, using a new microbiological method; Research Contract No. 79, A study of the uptake of radioactive calcium in the skeleton. Reports related to Radiobiology are: Research Contract No.11, Genetical investigations on the effect of ionizing radiation on human cells

  20. IAEA research contracts. Third annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-04-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports in the field of Radioactive waste management and environmental research included are: Research Contract No.20. Studies in the uptake of radioisotopes by edible marine products; Research Contract No. 33, Behaviour of fission products in soil; Research Contract No.100, Ionic interaction near clay surfaces. Reports dealing with Health physics and radiation protection presented are: Research Contract No.14, The effect of radiation on plant cells and its modification with protective substances; Research Contract No.32, Determination of the enrichment factors of calcium isotopes on ion exchange resins and the investigation of the various systems of electrolytic separation; Research Contract No. 53, Selection of sulphydryl compounds for radiation protection, using a new microbiological method; Research Contract No. 79, A study of the uptake of radioactive calcium in the skeleton. Reports related to Radiobiology are: Research Contract No.11, Genetical investigations on the effect of ionizing radiation on human cells

  1. Management Control of Market Transactions: The Relation Between Transaction Characteristics, Incomplete Contract Design and Subsequent Performance

    NARCIS (Netherlands)

    Anderson, S.W.; Dekker, H.C.

    2005-01-01

    Using an unusually comprehensive database on 858 transactions for information technology products and accompanying services, we study how close partners who are exposed to opportunistic hazards structure and control a significant transaction. We analyze data on the terms of contracting to determine

  2. Understanding micro-processes of institutionalization: stewardship contracting and national forest management

    Science.gov (United States)

    Cassandra Moseley; Susan Charnley

    2014-01-01

    This paper examines micro-processes of institutionalization, using the case of stewardship contracting within the US Forest Service. Our basic premise is that, until a new policy becomes an everyday practice among local actors, it will not become institutionalized at the macro-scale. We find that micro-processes of institutionalization are driven by a mixture of large-...

  3. PROJECT HANFORD MANAGEMENT CONTRACT (PHMC) PERFORMANCE REPORT 05/2004 (WWW.HANFORD.GOV/EMPR.INDEX.CFM)

    International Nuclear Information System (INIS)

    PIELSTICK, R.M.

    2004-01-01

    This report is the monthly performance summary of the Central Plateau Contractors. FH work scope responsibilities are described, and other contractor/RL-managed work is excluded. Section A, Overview, provides a summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides key performance activities as extracted from the contractor baseline. Subsequent sections of this report provide detailed performance data relative to contract sections (e.g., Project Hanford Cleanup Work Summary, Waste and Spent Nuclear Fuel Management Operations, Infrastructure and Hanford Site Services, and other Work Scope). All information is as of the end of May 2004 unless otherwise noted

  4. Genetic Factors Involved in Fumonisin Accumulation in Maize Kernels and Their Implications in Maize Agronomic Management and Breeding.

    Science.gov (United States)

    Santiago, Rogelio; Cao, Ana; Butrón, Ana

    2015-08-20

    Contamination of maize with fumonisins depends on the environmental conditions; the maize resistance to contamination and the interaction between both factors. Although the effect of environmental factors is a determinant for establishing the risk of kernel contamination in a region, there is sufficient genetic variability among maize to develop resistance to fumonisin contamination and to breed varieties with contamination at safe levels. In addition, ascertaining which environmental factors are the most important in a region will allow the implementation of risk monitoring programs and suitable cultural practices to reduce the impact of such environmental variables. The current paper reviews all works done to address the influence of environmental variables on fumonisin accumulation, the genetics of maize resistance to fumonisin accumulation, and the search for the biochemical and/or structural mechanisms of the maize plant that could be involved in resistance to fumonisin contamination. We also explore the outcomes of breeding programs and risk monitoring of undertaken projects.

  5. Audit Report on Management Controls over the Use of Service Contracts at the Office of River Protection

    International Nuclear Information System (INIS)

    2009-01-01

    The Department of Energy's (Department) Office of River Protection (ORP) is responsible for the storage, treatment, and disposal of over 53 million gallons of highly radioactive waste from over 40 years of plutonium production at the Hanford Site. Because of the diversity, complexity, and large scope of its mission, coupled with its small staff, ORP told us that it has found it necessary to engage in service contracts to obtain consulting services, technical expertise, and support staff. Federal policy generally permits contractors to perform a wide range of support service activities, including, in most situations, the drafting of Government documents subject to the review and approval of Federal employees. Federal policy issued by the Office of Management and Budget, however, prohibits contractors from drafting agency responses to Congressional inquiries and reports issued by the Office of Inspector General and Government Accountability Office (GAO) because they are so closely related to the public interest and provide the appearance of private influence. To provide a majority of its needed services, ORP issued a Blanket Purchase Agreement to Project Assistance Corporation (PAC) in 2003. Through the Blanket Purchase Agreement, ORP acquired services in the areas of project management, risk assessment, program assessment, quality assurance, safety, cost and schedule estimating, budgeting and finance, and engineering. PAC has, in turn, subcontracted with various other firms to obtain some of the services needed by ORP. From 2005 to 2008, the total annual cost for the contract with PAC had grown from $4.7 million to $9.2 million. Because of the extent of the services provided and growing costs of the contract, we conducted this review to determine whether ORP appropriately administered its contract with the Project Assistance Corporation. Our review disclosed that, in some instances, ORP had not appropriately administered all work performed under the PAC contract

  6. Managing wind turbine reliability and maintenance via performance-based contract

    DEFF Research Database (Denmark)

    Jin, Tongdan; Ding, Yi; Guo, Huairui

    2012-01-01

    between system cost, reliability and spare parts stocking. This analytical insight into the system performance allows the turbine manufacturer to optimize design, production, and after-sales services. The study aims to create a theoretical basis to facilitate the transition of the maintenance paradigm......Performance-based contracting (PBC) is reshaping the acquisition, operation, and maintenance of capital equipment. Under the PBC scheme, we propose a holistic approach for lowering the cost of wind turbine ownership while meeting the availability requirement. Our effects are focused on integrated...... firms who design and market wind turbines, and also provide maintenance and repair service. PBC differs from conventional service contracts in that the wind farmers compensate the service provider for the system performance, not the spare parts and repair labor. We explore the analytical relationship...

  7. A Classification and Analysis of National Contract Management Journal Articles from 1966 Through 1989

    Science.gov (United States)

    1991-06-01

    author examined profitability in terms of the Capital Asset Pricing Model ( CAPM ) . This is a model designed by investment analysts to determine required...weapon systems are substituted for assets . The authors first examine the limitations of constrained optimization models , then describe the Portfolio...contracts. Other sections discuss warranty definition, approval, limitations on use, preparation, pricing aspects, and technical data. The new clauses are

  8. Banking contracts

    OpenAIRE

    Durčáková, Klára

    2010-01-01

    Resumé - Bank Contracts Bank Contracts are an integral part of our everyday lives. Citizen and bussines entities used bank contracts very often. Despite this fact we can't find legal definition in the Czech law. Banking contracts understand contracts that are signed by banks in their business activities and obligations under these contracts arise. While the banking contracts have been widely used, in Czech law there is not too much literature and judgements abou this issue. Lack of legislatio...

  9. Blockchain-based Smart Contracts in Waste Management : A Silver Bullet?

    NARCIS (Netherlands)

    G. (Guido) Ongena; Koen Smit; Jarno Boksebeld; Gerben Adams; Yorin Roelofs; Pascal Ravesteijn

    2018-01-01

    From the article: Blockchain technology may have the potential to fundamentally change society and we might currently witness the dawn of a cryptographically secured trust-free transactions economy. One relatively unexplored application domain is waste management. Incorrect waste management

  10. The use of Osseointegration and Orbital Implants in the Management of Orbital Exenteration or Severe Contracted Sockets

    Directory of Open Access Journals (Sweden)

    Emine Esra Karaca

    2014-03-01

    Full Text Available Objectives: To evaluate the results of bony integrated implants used in the management of exenterated or contracted sockets. Materials and Methods: Ten eyes of 10 cases underwent bony integrated implants for the management of exenterated (7 eyes or contracted (3 eyes sockets. The procedure was performed in two steps in a two-month period. The first step included placement of screws by preparing the osteotomy site, whereas the second step included implantation of magnetic implants over these screws that will adhere to the orbital implant. The patients were retrospectively evaluated for age, gender, etiology, surgical timing, history of radiotherapy, and time of application of epithesis. The presence of infection at the surgical site, implant loss, functional or cosmetic problems at the perisurgical area, the usage of epithesis during the social life were evaluated. Results: There were 7 female and 3 male patients. The mean age was 34 (5-75 years. The indications for enucleation or exenteration were: retinoblastoma (4 cases, malignant melanoma (2 cases, basal cell carcinoma (1 case, squamous cell carcinoma (1 case, rhabdomyosarcoma (1 case and sinoorbital mucormycosis (1 case. The epitheses were applied 3 to 156 months (mean 51 months following the intervention. All of the implantations were performed successfully. During follow-up, one case had lost the implant and one case had local infection that responded to antibiotic treatment. Three cases were reoperated and the implants were replaced after a 2-year follow-up time due to the deterioration of the magnetic effect of the implants. Conclusion: Bony integrated orbital implants have an important role in solution of esthetic problems encountered in the exenterated orbit and severe contracted socket. (Turk J Ophthalmol 2014; 44: 127-31

  11. 48 CFR 935.071 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 935.071... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 935.071 Contract clause. The contracting officer must insert the clause at 952.235-71, Research Misconduct, in contracts, including management and operating...

  12. The Role of a Human Factor and Psychological Contract in Managing the Knowledge in Conditions of Globalization

    Directory of Open Access Journals (Sweden)

    Joanna Rębisz

    2008-07-01

    Full Text Available The modern business world is characterized by dynamic, changing markets and continuous technological advance. This article focuses on an issue related to a definition of the meaning of a man and his location in an organization that works in conditions of globalization. Certainly, the meaning of human as the source of knowledge in the development of organization is not a new subject. Knowledge is intrinsically linked to people and enables them to act. Modern organizations base their theory on the knowledge they can exploit to improve the competence of the employee, his loyalty and commitment to the company which aims at the competitive predominance. The identification of knowledge is necessary for the effective implementation of knowledge management system. Above all, presented theoretical analysis pinpoints mainly on discussing a mans role and psychological contract in managing the knowledge.

  13. Importance of birthcoat for lamb survival and growth in the Romane sheep breed extensively managed on rangelands.

    Science.gov (United States)

    Allain, D; Foulquié, D; Autran, P; Francois, D; Bouix, J

    2014-01-01

    The Romane sheep breed proved to be adapted to harsh conditions with high prolificacy and lamb survival in outdoor farming, even under bad climate conditions. This breed shows large variability in its fleece type at birth and it has been suggested that lamb survival could be related to birthcoat type. The aim of the present study was to: i) characterize the coat of the lamb at birth and quantify lamb survival in relation to the birthcoat type and its protective properties concerning heat loss in the Romane breed raised under permanent exposure outdoors from birth, and ii) estimate genetic parameters of birthcoat type in relation to lamb survival and live body weight. A total of 7,880 lambs from 104 sires and 1,664 dams were used in a 14-yr experiment. The pedigree file included 9,625 individuals over 15 generations. Birthcoat type, coat surface temperature, coat depth, lamb survival, and growth were measured from birth to weaning. Weather data (temperature, wind speed, relative humidity, and precipitation) were recorded daily during lambing time. Two types of coats were observed at birth: hairy coat (62.9% of lambs) with a long coat depth (average 23.3 mm) or woolly 1 (37.1% of lambs) with a short coat depth (average 8.3 mm). Birthcoat type was an important factor affecting lamb survival and growth from birth in the Romane breed. Total mortality rate was significantly less in hairy-bearing coat lambs than in short-woolly coat ones: 7.0% vs. 9.6%, 11.6 % vs. 14.8%, and 15.7 % vs. 20.1 % at 2, 10, and 50 d, respectively, and the relative risks of death increased by 37%, 67%, and 46 % at 2, 10, and 50 d of age, respectively, in short-woolly lambs. At birth, a significant lower coat surface temperature, indicating less heat loss, was observed in long-hairy coat lambs compared with others (21.1°C vs. 26.1°C). Heavier body weights and better growth performances up to the age of 50 d were observed in long-hairy-bearing coat lambs. Lamb survival was positively correlated

  14. Annual report of the project BDI 5001: Improving cassava productivity through mutation breeding and better water and nutrient management practices using nuclear techniques

    International Nuclear Information System (INIS)

    2018-01-01

    Implementating the IAEA/BDI 5001 project, ISABU has conducted several activities in order to contribute to the food security improvement and farmers’ incomes. Cassava productivity was indeed improved through soil fertilization, mutation breeding, cassava in vitro mutagenesis, halding mutant populations and best water and nutrient management practices using nuclear techniques. Scientific visits, workshops and farmer field schools were organized for different associations in different regions of Burundi for exchange of experience and diseases limitation. The expected results were the soil fertility, a good water management and the increase of the capacity of cassava to resist diseases, which gives a good yield of cassava. High officials from Burundi and expert form IAEA visited the project, the constraint is the lack of irradiation facilities in the region and ISABU propose that IAEA should support national Institutes.

  15. Managing Distrust-Induced Risk with Deposit in Supply Chain Contract Decisions

    Science.gov (United States)

    Han, Guanghua; Dong, Ming; Sun, Qi

    2014-01-01

    This paper studies the trust issue in a two-echelon supply chain information sharing process. In a supply chain, the retailer reports the forecasted demand to the supplier. Traditionally, the supplier's trust in the retailer's reported information is based on the retailer's reputation. However, this paper considers that trust is random and is also affected by the reputation and the demand gap. The supplier and retailer have been shown to have different evaluations regarding the degree of trust. Furthermore, distrust is inherently linked to perceived risk. To mitigate perceived risk, a two-stage decision process with an unpayback deposit contract is proposed. At the first stage, the supplier and the retailer negotiate the deposit contract. At the second stage, a Stackelberg game is used to determine the retailer's reported demand and the supplier's production quantity. We show that the deposits from the retailer's and supplier's perspectives are different. When the retailer's reported demand is equal to the supplier's forecasted demand, the retailer's evaluation of the deposit is more than that of supplier's. When the retailer's reported demand is equal to the retailer's forecasted demand, the deposit from the retailer's perspective is at the lowest level. PMID:25054190

  16. Managing Distrust-Induced Risk with Deposit in Supply Chain Contract Decisions

    Directory of Open Access Journals (Sweden)

    Guanghua Han

    2014-01-01

    Full Text Available This paper studies the trust issue in a two-echelon supply chain information sharing process. In a supply chain, the retailer reports the forecasted demand to the supplier. Traditionally, the supplier’s trust in the retailer’s reported information is based on the retailer’s reputation. However, this paper considers that trust is random and is also affected by the reputation and the demand gap. The supplier and retailer have been shown to have different evaluations regarding the degree of trust. Furthermore, distrust is inherently linked to perceived risk. To mitigate perceived risk, a two-stage decision process with an unpayback deposit contract is proposed. At the first stage, the supplier and the retailer negotiate the deposit contract. At the second stage, a Stackelberg game is used to determine the retailer’s reported demand and the supplier’s production quantity. We show that the deposits from the retailer’s and supplier’s perspectives are different. When the retailer’s reported demand is equal to the supplier’s forecasted demand, the retailer’s evaluation of the deposit is more than that of supplier’s. When the retailer’s reported demand is equal to the retailer’s forecasted demand, the deposit from the retailer’s perspective is at the lowest level.

  17. Public Internal Performance Contracting - Managing and financing energy-efficiency measures in public administrations

    International Nuclear Information System (INIS)

    Irrek, Wolfgang; Thomas, Stefan; Attali, Sophie; Benke, Georg; Borg, Nils; Figorski, Arkadiusz; Filipowicz, Mariusz; Labanca, Nicola; Pindar, Andrew; Ochoa, Amalia

    2005-01-01

    Public Internal Performance Contracting (PICO) is a type of in-house 'third-party' financing or energy performance contracting scheme. In theory, once triggered, PICO provides a 'perpetual motion' finance mechanism for public authorities by which energy efficiency savings fund new investments in an upward virtuous cycle. One unit of the public authority, e.g. the technical department, delivers the financial and technical energy efficiency service to another unit of the same public administration. Remuneration takes place through cross payments between these units, according savings made in energy costs. The initial investments require 'seed funds' to kick start the process, after which the cross payments provide sufficient means to fund further measures. How can the PICO mechanism be initiated in times of tight public budgets? What difficulties are faced during the implementation process and how can these be overcome? What kind of energy-efficiency measures is PICO best suited to? And what role can national and European policy play to facilitate implementation? These are the key questions that the EU-funded PICOLight project aimed to tackle. This was done through testing and disseminating the PICO schemes, first used in Germany, in six European countries, developing these further and making the necessary adaptations. PICO schemes were piloted in seven public administrations with the technical focus on energy-efficient lighting retrofits. The experiences gathered in these pilot projects should help to introduce PICO schemes on a larger scale in public administrations in Europe. The paper presents the preliminary results from these pilot projects

  18. Managing distrust-induced risk with deposit in supply chain contract decisions.

    Science.gov (United States)

    Han, Guanghua; Dong, Ming; Sun, Qi

    2014-01-01

    This paper studies the trust issue in a two-echelon supply chain information sharing process. In a supply chain, the retailer reports the forecasted demand to the supplier. Traditionally, the supplier's trust in the retailer's reported information is based on the retailer's reputation. However, this paper considers that trust is random and is also affected by the reputation and the demand gap. The supplier and retailer have been shown to have different evaluations regarding the degree of trust. Furthermore, distrust is inherently linked to perceived risk. To mitigate perceived risk, a two-stage decision process with an unpayback deposit contract is proposed. At the first stage, the supplier and the retailer negotiate the deposit contract. At the second stage, a Stackelberg game is used to determine the retailer's reported demand and the supplier's production quantity. We show that the deposits from the retailer's and supplier's perspectives are different. When the retailer's reported demand is equal to the supplier's forecasted demand, the retailer's evaluation of the deposit is more than that of supplier's. When the retailer's reported demand is equal to the retailer's forecasted demand, the deposit from the retailer's perspective is at the lowest level.

  19. The role of psychological contract on employee commitment and organisational citizenship behaviour: A study of Indonesian young entrepreneurs in management action

    OpenAIRE

    Anggraeni, Ade I.; Dwiatmadja, Christantius; Yuniawan, Ahyar

    2017-01-01

    Orientation: This study aims to analyse the entrepreneurship-driven reasons and characteristics of employee management of the young generation, by analysing the role of psychological contract on employee commitment and organisational citizenship behaviour in the light of the characteristics of the millennial generation as the owners of small and medium-sized enterprises. Research purpose: The main objective of this study was to empirically analyse the effect of the psychological contract ...

  20. Review and Necessity of Recognizing Risk Management in Civil Projects and Contracts

    OpenAIRE

    VOSOUGHI, Pouyan; VOSOUGHI, Vandad

    2015-01-01

    Proper risk management is the reason for which risk (and its various types) is assigned to that section that is able to manage it in the best way but is the section which is able to manage the risk in the best way the same party that has the most effect on the probability of an adverse occurrence or is the section that is able to manage the results in the best way after the adverse occurrence. Now by considering the size, nature and complexity of the projects, the necessity of having the tech...

  1. Contract design

    International Nuclear Information System (INIS)

    Bradley, P.

    2006-01-01

    The current state of the electric power industry in Ontario was discussed with particular reference to the procurement of contracts and why the Ontario Power Authority (OPA) must be contracting to resolve many of Ontario's electricity issues. As Ontario increasingly relies on imports and natural gas-fired generation, the price of electricity continues to rise given that supply is at a low level. In addition to the generation gap, there are also several transmission constrained areas in Ontario, particularly in the Greater Toronto Area (GTA). The OPA announced 2 projects totalling 1900 MW to relieve congestion. According to the Independent Electricity System Operator (IESO), the total potential opportunity for new generation by 2015 is about 5,000 to 7,000 megawatts. OPA is expected to launch procurement processes for up to 1000 MW of cogeneration, 250 MW of province-wide conservation initiatives, 1900 MW of generation in the western part of the GTA, and 600 MW of generation in downtown Toronto. New nuclear capacity is also anticipated in addition to renewables and conservation/demand management (CDM) initiatives. The OPA's competitive procurement processes will include requests for expressions of interest, requests for qualifications and requests for proposals. The challenge of balancing the technical complexities and realities of procuring generation assets with the need for a fair procurement process was discussed. Contracts will be designed to react to market signals and will include 3 styles: tariff style, tolling style and standard offer contract. OPA will make every effort to balance generator and ratepayer interests. 6 figs

  2. Perceived barriers to utilizing maternal and neonatal health services in contracted-out versus government-managed health facilities in the rural districts of Pakistan.

    Science.gov (United States)

    Riaz, Atif; Zaidi, Shehla; Khowaja, Asif Raza

    2015-03-06

    A number of developing countries have contracted out public health facilities to the Non-Government Organizations (NGOs) in order to improve service utilization. However, there is a paucity of in-depth qualitative information on barriers to access services as a result of contracting from service users' perspective. The objective of this study was to explore perceived barriers to utilizing Maternal and Neonatal Health (MNH) services, in health facilities contracted out by government to NGO for service provision versus in those which are managed by government (non-contracted). A community-based qualitative exploratory study was conducted between April to September 2012 at two contracted-out and four matched non-contracted primary healthcare facilities in Thatta and Chitral, rural districts of Pakistan. Using semi-structured guide, the data were collected through thirty-six Focus Group Discussions (FGDs) conducted with mothers and their spouses in the catchment areas of selected facilities. Thematic analysis was performed using NVivo version 10.0 in which themes and sub-themes emerged. Key barriers reported in contracted sites included physical distance, user charges and familial influences. Whereas, poor functionality of health centres was the main barrier for non-contracted sites with other issues being comparatively less salient. Decision-making patterns for participants of both catchments were largely similar. Spouses and mother-in-laws particularly influenced the decision to utilize health facilities. Contracting out of health facility reduces supply side barriers to MNH services for the community served but distance, user charges and low awareness remain significant barriers. Contracting needs to be accompanied by measures for transportation in remote settings, oversight on user fee charges by contractor, and strong community-based behavior change strategies. © 2015 by Kerman University of Medical Sciences.

  3. Perceived Barriers to Utilizing Maternal and Neonatal Health Services in Contracted-Out Versus Government-Managed Health Facilities in the Rural Districts of Pakistan

    Directory of Open Access Journals (Sweden)

    Atif Riaz

    2015-05-01

    Full Text Available Background A number of developing countries have contracted out public health facilities to the Non-Government Organizations (NGOs in order to improve service utilization. However, there is a paucity of in-depth qualitative information on barriers to access services as a result of contracting from service users’ perspective. The objective of this study was to explore perceived barriers to utilizing Maternal and Neonatal Health (MNH services, in health facilities contracted out by government to NGO for service provision versus in those which are managed by government (non-contracted. Methods A community-based qualitative exploratory study was conducted between April to September 2012 at two contracted-out and four matched non-contracted primary healthcare facilities in Thatta and Chitral, rural districts of Pakistan. Using semi-structured guide, the data were collected through thirty-six Focus Group Discussions (FGDs conducted with mothers and their spouses in the catchment areas of selected facilities. Thematic analysis was performed using NVivo version 10.0 in which themes and sub-themes emerged. Results Key barriers reported in contracted sites included physical distance, user charges and familial influences. Whereas, poor functionality of health centres was the main barrier for non-contracted sites with other issues being comparatively less salient. Decision-making patterns for participants of both catchments were largely similar. Spouses and mother-in-laws particularly influenced the decision to utilize health facilities. Conclusion Contracting out of health facility reduces supply side barriers to MNH services for the community served but distance, user charges and low awareness remain significant barriers. Contracting needs to be accompanied by measures for transportation in remote settings, oversight on user fee charges by contractor, and strong communitybased behavior change strategies.

  4. Dengue vector management using insecticide treated materials and targeted interventions on productive breeding-sites in Guatemala

    Directory of Open Access Journals (Sweden)

    Rizzo Nidia

    2012-10-01

    Full Text Available Abstract Background In view of the epidemiological expansion of dengue worldwide and the availability of new tools and strategies particularly for controlling the primary dengue vector Aedes aegypti, an intervention study was set up to test the efficacy, cost and feasibility of a combined approach of insecticide treated materials (ITMs alone and in combination with appropriate targeted interventions of the most productive vector breeding-sites. Methods The study was conducted as a cluster randomized community trial using “reduction of the vector population” as the main outcome variable. The trial had two arms: 10 intervention clusters (neighborhoods and 10 control clusters in the town of Poptun Guatemala. Activities included entomological assessments (characteristics of breeding-sites, pupal productivity, Stegomyia indices at baseline, 6 weeks after the first intervention (coverage of window and exterior doorways made of PermaNet 2.0 netting, factory treated with deltamethrin at 55 mg/m2, and of 200 L drums with similar treated material and 6 weeks after the second intervention (combination of treated materials and other suitable interventions targeting productive breeding-sites i.e larviciding with Temephos, elimination etc.. The second intervention took place 17 months after the first intervention. The insecticide residual activity and the insecticidal content were also studied at different intervals. Additionally, information about demographic characteristics, cost of the intervention, coverage of houses protected and satisfaction in the population with the interventions was collected. Results At baseline (during the dry season a variety of productive container types for Aedes pupae were identified: various container types holding >20 L, 200 L drums, washbasins and buckets (producing 83.7% of all pupae. After covering 100% of windows and exterior doorways and a small number of drums (where the commercial cover could be fixed in 970 study

  5. Dengue vector management using insecticide treated materials and targeted interventions on productive breeding-sites in Guatemala.

    Science.gov (United States)

    Rizzo, Nidia; Gramajo, Rodrigo; Escobar, Maria Cabrera; Arana, Byron; Kroeger, Axel; Manrique-Saide, Pablo; Petzold, Max

    2012-10-30

    In view of the epidemiological expansion of dengue worldwide and the availability of new tools and strategies particularly for controlling the primary dengue vector Aedes aegypti, an intervention study was set up to test the efficacy, cost and feasibility of a combined approach of insecticide treated materials (ITMs) alone and in combination with appropriate targeted interventions of the most productive vector breeding-sites. The study was conducted as a cluster randomized community trial using "reduction of the vector population" as the main outcome variable. The trial had two arms: 10 intervention clusters (neighborhoods) and 10 control clusters in the town of Poptun Guatemala. Activities included entomological assessments (characteristics of breeding-sites, pupal productivity, Stegomyia indices) at baseline, 6 weeks after the first intervention (coverage of window and exterior doorways made of PermaNet 2.0 netting, factory treated with deltamethrin at 55 mg/m2, and of 200 L drums with similar treated material) and 6 weeks after the second intervention (combination of treated materials and other suitable interventions targeting productive breeding-sites i.e larviciding with Temephos, elimination etc.). The second intervention took place 17 months after the first intervention. The insecticide residual activity and the insecticidal content were also studied at different intervals. Additionally, information about demographic characteristics, cost of the intervention, coverage of houses protected and satisfaction in the population with the interventions was collected. At baseline (during the dry season) a variety of productive container types for Aedes pupae were identified: various container types holding >20 L, 200 L drums, washbasins and buckets (producing 83.7% of all pupae). After covering 100% of windows and exterior doorways and a small number of drums (where the commercial cover could be fixed) in 970 study households, tropical rains occurred in the area and

  6. Diagnostic and control functions of the radioisotope methods for the reproduction management of cattle and sheep breeding

    International Nuclear Information System (INIS)

    Dimitrov, M.; Georgiev, P.; Vasilev, K.

    1988-01-01

    The following applications of radioimmunoassay were studied: 1) for early diagnosis of pregnance in caws and sheep by determination of progesterone (PG) in milk and blood plasma via veterinary radioimmunological test STERON - RM 125 ; 2) for diagnosis and treatment of ovarian disturbances in cows by RIA of luteinizing hormone (LH), follicle stimulating hormone (FSH) and PG in blood plasma; 3) for control of the biological efficiency of sheep estrus synchronisation with MAP (vaginal tampons) and Estrophan (PgF 2 α); 4) for control of the reproductive condition of rams and effect of Tribestan in treatment of different forms of impotention by RIA of testosterone in blood. It was established that the use of RIA objectified the process of decision-making in regulation of the reproduction deviations in ruminating farm animals by veterinary means. Conclusions are drawn and suppositions are made for introduction of the radioisotope methods in the reproduction control of cattle and sheep breeding in practice. 4 tabs.; 15 refs

  7. Management Earnings Forecasts as a Performance Target in Executive Compensation Contracts

    OpenAIRE

    Shota Otomasa; Atsushi Shiiba; Akinobu Shuto

    2015-01-01

    This paper investigates whether and how Japanese firms use management earnings forecasts as a performance target for determining executive cash compensation. Consistent with the implications of the principal-agent theory, we find that the sensitivity of executive cash compensation varies with the extent to which realized earnings exceed initial management forecasts. In particular, we find that, for a sample of Japanese firms comprising 14,899 firm-year observations from 2005 to 2012, the exec...

  8. Breeds of cattle

    NARCIS (Netherlands)

    Buchanan, David S.; Lenstra, Johannes A.

    2015-01-01

    This chapter gives an overview on the different breeds of cattle (Bos taurus and B. indicus). Cattle breeds are presented and categorized according to utility and mode of origin. Classification and phylogeny of breeds are also discussed. Furthermore, a description of cattle breeds is provided.

  9. State health managers' perceptions of the Public Health Action Organizational Contract in the State of Ceará, Brazil.

    Science.gov (United States)

    Goya, Neusa; Andrade, Luiz Odorico Monteiro de; Pontes, Ricardo José Soares; Tajra, Fábio Solon; Barreto, Ivana Cristina de Holanda Cunha

    2017-04-01

    The Public Health Action Organizational Contract (COAP) / Decree 7.508/2011 aimed to seal health agreements made between federated entities to promote the cooperative governance and management of Health Regions. A qualitative study was carried out adopting a hermeneutic approach to understand state health managers' perceptions of the elaboration and effects of the COAP in the State of Ceará. Open-ended interviewees and documental analysis were conducted. It was observed that the COAP led to the strengthening of regionalization in the government sphere; institutional gains through the implementation of ombudsmen and the National System of Pharmaceutical Care Management; increased information about the state health system's workforce; and health budget transparency. The following problems were (re)visited: institutional weakness in the operation of the network; limited state capacity for regulation of care; and underfunding. Regional governance was restricted to the government sphere, coordinated by the state, and was characterized by a predominantly bureaucratic and hierarchical governance structure. The COAP inaugurated a contractual interfederative model of regionalization, but revealed the institutional weaknesses of the SUS and its lacks of capacity to fulfill its principles as the structural problems of the three-tiered model go unaddressed.

  10. Balancing habitat delivery for breeding marsh birds and nonbreeding waterfowl: An integrated waterbird management and monitoring approach at Clarence Cannon National Wildlife Refuge, Missouri

    Science.gov (United States)

    Loges, Brian W.; Lyons, James E.; Tavernia, Brian G.

    2017-08-23

    The Clarence Cannon National Wildlife Refuge (CCNWR) in the Mississippi River flood plain of eastern Missouri provides high quality emergent marsh and moist-soil habitat benefitting both nesting marsh birds and migrating waterfowl. Staff of CCNWR manipulate water levels and vegetation in the 17 units of the CCNWR to provide conditions favorable to these two important guilds. Although both guilds include focal species at multiple planning levels and complement objectives to provide a diversity of wetland community types and water regimes, additional decision support is needed for choosing how much emergent marsh and moist-soil habitat should be provided through annual management actions.To develop decision guidance for balanced delivery of high-energy waterfowl habitat and breeding marsh bird habitat, two measureable management objectives were identified: nonbreeding Anas Linnaeus (dabbling duck) use-days and Rallus elegans (king rail) occupancy of managed units. Three different composite management actions were identified to achieve these objectives. Each composite management action is a unique combination of growing season water regime and soil disturbance. The three composite management actions are intense moist-soil management (moist-soil), intermediate moist-soil (intermediate), and perennial management, which idles soils disturbance (perennial). The two management objectives and three management options were used in a multi-criteria decision analysis to indicate resource allocations and inform annual decision making. Outcomes of the composite management actions were predicted in two ways and multi-criteria decision analysis was used with each set of predictions. First, outcomes were predicted using expert-elicitation techniques and a panel of subject matter experts. Second, empirical data from the Integrated Waterbird Management and Monitoring Initiative collected between 2010 and 2013 were used; where data were lacking, expert judgment was used. Also, a

  11. Aligning drivers, contract, and management of IT-outsourcing relationships: a type-dependent model

    DEFF Research Database (Denmark)

    Arenfeldt, Katrine; Corty Dam, Amalie; Fenger, Kim Harder

    2017-01-01

    In today’s competitive business environment, information technology outsourcing has become a wide-spread reality across all industries and sectors. Researchers have investigated this complex phenomenon from various angles, and established a sound knowledge base regarding the drivers, management, ...

  12. DCASR (Defense Contract Administration Service Region), Boston Is the Customer’s Voice. Total Quality Management

    Science.gov (United States)

    1989-10-01

    been Hoshin Kanri , the Japanese term for Management by Planning, which loosely translates as "compass" and "sextant". When we initially began the...commitment empowered us to develop a plan which would clearly point the direction ( Hoshin ), as well as provide the structure for getting there ( Kanri

  13. Privacy Management Service Contracts as a New Business Opportunity for Operators

    NARCIS (Netherlands)

    L-F. Pau (Louis-François)

    2006-01-01

    textabstractRecognizing the importance of privacy management as a business process and a business support process, this paper proposes the use of service level agreements (SLA’s) around privacy features, including qualitative and quantitative ones. Privacy metrics are defined by both parties with

  14. Integral Risk Management for DBFM Tenders and Contracts in the Netherlands

    NARCIS (Netherlands)

    Wong, J.; Berkelaar, R.; Pekelharing, H.

    2015-01-01

    This paper presents an overview of an integral risk management approach with emphasis on the relationships with the costing and scheduling processes. Forms of uncertainty related to project planning are classified and implemented in the probabilistic costing and scheduling processes. Furthermore,

  15. 48 CFR 542.1107 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Production Surveillance and Reporting 542.1107 Contract... clause may be used in indefinite-delivery definite-quantity contracts for Stock or Special Order Program...

  16. 42 CFR 422.504 - Contract provisions.

    Science.gov (United States)

    2010-10-01

    ...) MEDICARE PROGRAM MEDICARE ADVANTAGE PROGRAM Application Procedures and Contracts for Medicare Advantage... determinations of amounts payable under the contract. (iv) Properly reflect all direct and indirect costs claimed..., contracts, and subcontracts. (vi) Franchise, marketing, and management agreements. (vii) Schedules of...

  17. Contracting for Public Services

    DEFF Research Database (Denmark)

    Greve, Carsten

    strategic purchasing understanding markets communicating the contracting decision designing and drafting the contract the role of the consumer the regulation of service provision Illustrated throughout with practitioner case-studies from a range of OECD countries, this book presents an important new......Insightful and comprehensive and covering new subjects like globalization and IT, this text, international in its approach, provides a thorough introduction to the key phases of the contracting process and the skills required by managers in its implementation. These include: policy for contracting...

  18. Aligning drivers, contract, and management of IT-outsourcing relationships: a type-dependent model

    DEFF Research Database (Denmark)

    Arenfeldt, Katrine; Corty Dam, Amalie; Fenger, Kim Harder

    2017-01-01

    In today’s competitive business environment, information technology outsourcing has become a wide-spread reality across all industries and sectors. Researchers have investigated this complex phenomenon from various angles, and established a sound knowledge base regarding the drivers, management......, and success factors related to IT outsourcing. However, little is known about the relationship between outsourcing drivers and goals on the one hand, and contractual and managerial aspects on the other hand. To overcome this gap, this study presents a synthesized conceptual model of existing literature...... that relates aspects of contractual governance and relationship management to three generic types of IT outsourcing, based on their underlying drivers: task-based, process-based, and partnership-based outsourcing. Our model identifies the specific contractual and managerial factors relevant for each type...

  19. Using Blockchain Technology and Smart Contracts for Access Management in IoT devices

    OpenAIRE

    Bagchi, Rupsha

    2017-01-01

    The Internet of Things is a proliferating industry, which is transforming many homes and businesses, making them smart. However, the rapid growth of these devices and the interactions between these devices, introduces many challenges including that of a secure management system for the identities and interactions of the devices. While the centralized model has worked well for many years, there is a risk of the servers becoming bottlenecks and a single point of failure, thereby making them vul...

  20. 41 CFR 109-27.102-50 - Systems contracting.

    Science.gov (United States)

    2010-07-01

    ...-INVENTORY MANAGEMENT 27.1-Stock Replenishment § 109-27.102-50 Systems contracting. Systems contracting may... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Systems contracting. 109-27.102-50 Section 109-27.102-50 Public Contracts and Property Management Federal Property Management...

  1. 48 CFR 46.314 - Transportation contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Transportation contracts... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.314 Transportation contracts. The contracting officer shall insert the clause at 52.246-14, Inspection of Transportation, in solicitations and contracts for freight...

  2. Using SCOR as a Supply Chain Management Framework for Government Agency Contract Requirements

    Science.gov (United States)

    Paxton, Joe

    2010-01-01

    Enterprise Supply Chain Management consists of: Specifying suppliers to support inter-program and inter-agency efforts. Optimizing inventory levels and locations throughout the supply chain. Executing corrective actions to improve quality and lead time issues throughout the supply chain. Processing reported data to calculate and make visible supply chain performance (provide information for decisions and actions). Ensuring the right hardware and information is provided at the right time and in the right place. Monitoring the industrial base while developing, producing, operating and retiring a system. Seeing performance deep in the supply chain that could indicate issues affecting system availability and readiness.

  3. Short-Term Effects of Understory and Overstory Management on Breeding Birds in Arkansas Oak-Hickory Forests

    Science.gov (United States)

    Paul G. Rodewald; Kimberly G. Smith

    1998-01-01

    Relatively little is known about the effects of uneven-aged forest management practices on eastern forest birds, despite the fact that such methods are now commonly practiced. In 1993-94, we studied the short-term effects of uneven-aged forest management on bird communities in oak-hickory forests of north-western Arkansas. We estimated bird abundance in mature forests...

  4. Development of project management data calculation models relating to dismantling of nuclear facilities. Contract research

    Energy Technology Data Exchange (ETDEWEB)

    Sukegawa, Takenori; Ohshima, Soichiro; Shiraishi, Kunio; Yanagihara, Satoshi [Department of Decommissioning and Waste Management, Tokai Research Establishment, Japan Atomic Energy Research Institute, Tokai Ibaraki (Japan)

    1999-02-01

    Labor-hours necessary for dismantling activities are generally estimated based on experience, for example, as a form of unit productivity factors such as the relationship between labor-hours and weight of components dismantled which were obtained by actual dismantling activities. The project management data calculation models together with unit productivity factors for basic dismantling work activities were developed by analyzing the data obtained from the Japan Power Demonstration Reactor (JPDR) dismantling project, which will be applicable to estimation of labor-hours in various dismantling conditions. Typical work breakdown structures were also prepared by categorizing repeatable basic dismantling work activities for effective planning of dismantling activities. The labor-hours for dismantling the JPDR components and structures were calculated by using the code system for management of reactor decommissioning (COSMARD), in which the work breakdown structures and the calculation models were contained. It was confirmed that the labor-hours could be easily estimated by COSMARD through the calculations. This report describes the labor-hour calculation models and application of these models to COSMARD. (author)

  5. Organic breeding: New trend in plant breeding

    Directory of Open Access Journals (Sweden)

    Berenji Janoš

    2009-01-01

    Full Text Available Organic breeding is a new trend in plant breeding aimed at breeding of organic cultivars adapted to conditions and expectations of organic plant production. The best proof for the need of organic cultivars is the existence of interaction between the performances of genotypes with the kind of production (conventional or organic (graph. 1. The adaptation to low-input conditions of organic production by more eddicient uptake and utilization of plant nutrients is especially important for organic cultivars. One of the basic mechanism of weed control in organic production is the competition of organic cultivars and weeds i.e. the enhanced ability of organic cultivars to suppress the weeds. Resistance/tolerance to diseases and pests is among the most important expectations toward the organic cultivars. In comparison with the methods of conventional plant breeding, in case of organic plant breeding limitations exist in choice of methods for creation of variability and selection classified as permitted, conditionally permitted and banned. The use of genetically modified organisms and their derivated along with induced mutations is not permitted in organic production. The use of molecular markers in organic plant breeding is the only permitted modern method of biotechnology. It is not permitted to patent the breeding material of organic plant breeding or the organic cultivars. .

  6. A stepwise approach for the management of capsular contraction syndrome in hinge-based accommodative intraocular lenses.

    Science.gov (United States)

    Page, Timothy P; Whitman, Jeffrey

    2016-01-01

    The aims of this study are to define the various stages of capsular contraction syndrome (CCS) and its effect on refractive error with hinge-based accommodating intraocular lenses (IOLs) and to describe a systematic approach for the management of the different stages of CCS. Hinge-based accommodative IOLs function via flexible hinges that vault the optic forward during accommodation. However, it is the flexibility of the IOL that makes it prone to deformation in the event of CCS. The signs of CCS are identified and described as posterior capsular striae, fibrotic bands across the anterior or posterior capsule, and capsule opacification. Various degrees of CCS may affect hinge-based accommodating IOLs in a spectrum from subtle changes in IOL appearance to significant increases in refractive error and loss of uncorrected visual acuity. The signs of CCS and its effect on IOL position and the resulting changes in refractive error are matched to appropriate treatment plans. A surgeon can avoid CCS and manage the condition if familiar with the early signs of CCS. If CCS is identified, yttrium-aluminum-garnet laser capsulotomy should be considered. If moderate CCS occurs, it may be effectively treated with insertion of a capsular tension ring. If CCS is allowed to progress to advanced stages, an IOL exchange may be necessary. Surgeons should be familiar with the stages of CCS and subsequent interventions. The steps outlined in this article help to guide surgeons in the prevention and management of CCS with hinge-based accommodative IOLs in order to provide improved refractive outcomes for patients.

  7. A stepwise approach for the management of capsular contraction syndrome in hinge-based accommodative intraocular lenses

    Directory of Open Access Journals (Sweden)

    Page TP

    2016-06-01

    Full Text Available Timothy P Page,1 Jeffrey Whitman2 1Department of Ophthalmology, Oakland University William Beaumont School of Medicine, Royal Oak, MI, 2Key-Whitman Eye Center, Dallas, TX, USA Purpose: The aims of this study are to define the various stages of capsular contraction syndrome (CCS and its effect on refractive error with hinge-based accommodating intraocular lenses (IOLs and to describe a systematic approach for the management of the different stages of CCS. Methods: Hinge-based accommodative IOLs function via flexible hinges that vault the optic forward during accommodation. However, it is the flexibility of the IOL that makes it prone to deformation in the event of CCS. The signs of CCS are identified and described as posterior capsular striae, fibrotic bands across the anterior or posterior capsule, and capsule opacification. Various degrees of CCS may affect hinge-based accommodating IOLs in a spectrum from subtle changes in IOL appearance to significant increases in refractive error and loss of uncorrected visual acuity. The signs of CCS and its effect on IOL position and the resulting changes in refractive error are matched to appropriate treatment plans. Results: A surgeon can avoid CCS and manage the condition if familiar with the early signs of CCS. If CCS is identified, yttrium–aluminum–garnet laser capsulotomy should be considered. If moderate CCS occurs, it may be effectively treated with insertion of a capsular tension ring. If CCS is allowed to progress to advanced stages, an IOL exchange may be necessary. Conclusion: Surgeons should be familiar with the stages of CCS and subsequent interventions. The steps outlined in this article help to guide surgeons in the prevention and management of CCS with hinge-based accommodative IOLs in order to provide improved refractive outcomes for patients. Keywords: z-syndrome, pseudophakic tilt, IOL subluxation, CTR, capsular tension ring, capsular fibrosis

  8. Variation in Broccoli Cultivar Phytochemical Content under Organic and Conventional Management Systems: Implications in Breeding for Nutrition

    NARCIS (Netherlands)

    Renaud, E.N.C.; Lammerts Van Bueren, E.; Myers, J.R.; Caldas Paulo, M.J.; Eeuwijk, van F.A.; Zhu, N.; Juvik, J.A.

    2014-01-01

    Organic agriculture requires cultivars that can adapt to organic crop management systems without the use of synthetic pesticides as well as genotypes with improved nutritional value. The aim of this study encompassing 16 experiments was to compare 23 broccoli cultivars for the content of

  9. A review of best management practices and the mitigation of stream-breeding salamanders in the eastern deciduous forest

    Science.gov (United States)

    Thomas A. Maigret; John J. Cox

    2014-01-01

    Timber harvest has been implicated as a causative factor in the decline of amphibian populations and diversity in many areas of the world. The adoption of best management practices (BMPs) is intended to minimize the impacts of timber harvest on the biotic community, including amphibians and their habitat requirements. Herein, we synthesize the current scientific...

  10. On the Breeds of Cattle - Historic and Current Classifications

    DEFF Research Database (Denmark)

    Felius, Marleen; Koolmees, Peter A; Theunissen, Bert

    2011-01-01

    . This is largely in agreement with the breed clusters indicated by a biochemical and molecular genetic analysis, which reflect either groups of breeds with a common geographic origin or single breeds that have expanded by export and/or crossbreeding. We propose that this information is also relevant for managing...

  11. Stable occupancy by breeding hawks (Buteo spp.) over 25 years on a privately managed bunchgrass prairie in northeastern Oregon, USA

    Science.gov (United States)

    Kennedy, Patricia L.; Bartuszevige, Anne M.; Houle, Marcy; Humphrey, Ann B.; Dugger, Katie M.; Williams, John

    2014-01-01

    Potential for large prairie remnants to provide habitat for grassland-obligate wildlife may be compromised by nonsustainable range-management practices. In 1979–1980, high nesting densities of 3 species of hawks in the genus Buteo—Ferruginous Hawk (Buteo regalis), Red-tailed Hawk (B. jamaicensis), and Swainson's Hawk (B. swainsoni)—were documented on the Zumwalt Prairie and surrounding agricultural areas (34,361 ha) in northeastern Oregon, USA. This area has been managed primarily as livestock summer range since it was homesteaded. Unlike in other prairie remnants, land management on the Zumwalt Prairie was consistent over the past several decades; thus, we predicted that territory occupancy of these 3 species would be stable. We also predicted that territory occupancy would be positively related to local availability of nesting structures within territories. We evaluated these hypotheses using a historical dataset, current survey and habitat data, and occupancy models. In support of our predictions, territory occupancy of all 3 species has not changed over the study period of ∼25 yr, which suggests that local range-management practices are not negatively affecting these taxa. Probability of Ferruginous Hawk occupancy increased with increasing area of aspen, an important nest structure for this species in grasslands. Probability of Swainson's Hawk occupancy increased with increasing area of large shrubs, and probability of Red-tailed Hawk occupancy was weakly associated with area of conifers. In the study area, large shrubs and conifers are commonly used as nesting structures by Swainson's Hawks and Red-tailed Hawks, respectively. Availability of these woody species is changing (increases in conifers and large shrubs, and decline in aspen) throughout the west, and these changes may result in declines in Ferruginous Hawk occupancy and increases in Swainson's Hawk and Red-tailed Hawk occupancy in the future.

  12. Optimal Coordinated Management of a Plug-In Electric Vehicle Charging Station under a Flexible Penalty Contract for Voltage Security

    Directory of Open Access Journals (Sweden)

    Jip Kim

    2016-07-01

    Full Text Available The increasing penetration of plug-in electric vehicles (PEVs may cause a low-voltage problem in the distribution network. In particular, the introduction of charging stations where multiple PEVs are simultaneously charged at the same bus can aggravate the low-voltage problem. Unlike a distribution network operator (DNO who has the overall responsibility for stable and reliable network operation, a charging station operator (CSO may schedule PEV charging without consideration for the resulting severe voltage drop. Therefore, there is a need for the DNO to impose a coordination measure to induce the CSO to adjust its charging schedule to help mitigate the voltage problem. Although the current time-of-use (TOU tariff is an indirect coordination measure that can motivate the CSO to shift its charging demand to off-peak time by imposing a high rate at the peak time, it is limited by its rigidity in that the network voltage condition cannot be flexibly reflected in the tariff. Therefore, a flexible penalty contract (FPC for voltage security to be used as a direct coordination measure is proposed. In addition, the optimal coordinated management is formulated. Using the Pacific Gas and Electric Company (PG&E 69-bus test distribution network, the effectiveness of the coordination was verified by comparison with the current TOU tariff.

  13. Managing Contract Training Programs: Progress and Proposals. Institute for Studies in Higher Education Policy Paper No. 2.

    Science.gov (United States)

    Deegan, William L.

    An overview is provided of community college involvement in providing job training for industry on a contract basis. Part 1 provides background on the changing role of community colleges and the introduction of contract training as a means of addressing the growing need of organizations to train and retrain staff. Part 2 offers a national…

  14. Drilling contracts and incentives

    International Nuclear Information System (INIS)

    Osmundsen, Petter; Sorenes, Terje; Toft, Anders

    2008-01-01

    Shortages of rigs and personnel have encouraged discussion of designing incentive contracts in the drilling sector. However, for the drilling contracts, there are not a large variety of contract types in use. This article describes and analyses incentives for drilling contractors. These are directly represented by the compensation formats utilised in the present and in the consecutive drilling contracts. Indirectly, incentives are also provided by the evaluation criteria that oil companies use for awarding drilling assignments. Changes in contract format pose a number of relevant questions relating to resource management, and the article takes an in-depth look at some of these. Do evaluation criteria for awarding drilling assignments encourage the development of new technology and solutions? How will a stronger focus on drilling efficiency influence reservoir utilisation?

  15. Polymorphic Contracts

    Science.gov (United States)

    Belo, João Filipe; Greenberg, Michael; Igarashi, Atsushi; Pierce, Benjamin C.

    Manifest contracts track precise properties by refining types with predicates - e.g., {x : Int |x > 0 } denotes the positive integers. Contracts and polymorphism make a natural combination: programmers can give strong contracts to abstract types, precisely stating pre- and post-conditions while hiding implementation details - for example, an abstract type of stacks might specify that the pop operation has input type {x :α Stack |not ( empty x )} . We formalize this combination by defining FH, a polymorphic calculus with manifest contracts, and establishing fundamental properties including type soundness and relational parametricity. Our development relies on a significant technical improvement over earlier presentations of contracts: instead of introducing a denotational model to break a problematic circularity between typing, subtyping, and evaluation, we develop the metatheory of contracts in a completely syntactic fashion, omitting subtyping from the core system and recovering it post facto as a derived property.

  16. Administrative contracts

    Directory of Open Access Journals (Sweden)

    Vukićević-Petković Milica

    2015-01-01

    Full Text Available Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete understanding of the importance and essence of this institution as well as the need for its complete legal regulation.

  17. Electrical contracting

    CERN Document Server

    Neidle, Michael

    2013-01-01

    Electrical Contracting, Second Edition is a nine-chapter text guide for the greater efficiency in planning and completing installations for the design, installation and control of electrical contracts. This book starts with a general overview of the efficient cabling and techniques that must be employed for safe wiring design, as well as the cost estimation of the complete electrical contract. The subsequent chapters are devoted to other electrical contracting requirements, including electronic motor control, lighting, and electricity tariffs. A chapter focuses on the IEE Wiring Regulations an

  18. Administrative contracts

    OpenAIRE

    Vukićević-Petković Milica

    2015-01-01

    Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete u...

  19. Contracting as a Science

    Science.gov (United States)

    2012-04-30

    disconfirmation of expectations theory to examine customer satisfaction in the procuring contracting officer (PCO)–program manager (PM) relationship in...marketing terms, finding that disconfirmed expectations lead to consumer satisfaction or dissatisfaction. The former approach presents the idea that if an...individual exerts effort, the expectation is that successful performance will occur leading to a desired result. In contracting, the theory might be

  20. 48 CFR 242.302 - Contract administration functions.

    Science.gov (United States)

    2010-10-01

    ...) Contractor estimating systems (see FAR 15.407-5); and (B) Contractor material management and accounting... report identifying significant accounting system or related internal control deficiencies. (9) For... SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract...

  1. Maximizing Operational Efficiencies in Waste Management on the Hanford Plateau Remediation Contract in a Down-turned Market - 13484

    Energy Technology Data Exchange (ETDEWEB)

    Simiele, Connie J.; Blackford, L. Ty [CH2M HILL Plateau Remediation Contract - CHPRC (United States); West, Lori D. [East Tennessee Materials and Energy Corporation - M and EC (United States)

    2013-07-01

    Recent changes in DOE priorities and funding have pressed DOE and its contractors to look for innovative methods to sustain critical operations at sites across the Complex. At the Hanford Site, DOE Richland Operations and its prime contractor, CH2M Hill Plateau Remediation Company (CHPRC), have completed in-depth assessments of the Plateau Remediation Contract (PRC) operations that compared available funding to mission and operational objectives in an effort to maintain requisite safety and compliance margins while realizing cost savings that meet funding profiles. These assessments included confirmation of current baseline activities, identification of potential efficiencies, barriers to implementation, and potential increased risks associated with implementation. Six operating PRC waste management facilities were evaluated against three possible end-states: complete facility closure, maintaining base operations, and performing minimum safe surveillance and maintenance activities. The costs to completely close evaluated facilities were determined to be prohibitively high and this end-state was quickly dropped from consideration. A summary of the analysis of remaining options by facility, efficiencies identified, impact to risk profiles, and expected cost savings is provided in Table I. The expected cost savings are a result of: - right-sizing and cross-training work crews to address maintenance activities across facilities; - combining and sequencing 'like-moded' operational processes; - cross-cutting emergency planning and preparedness staffing; - resource redistribution and optimization; - reducing areas requiring routine surveillance and inspection. For the efficiencies identified, there are corresponding increases in risk, including a loss of breadth and depth of available resources; lengthened response time to emergent issues; inability to invest in opportunities for improvement (OFIs); potential single-point failures or non-compliancies due to

  2. Maximizing Operational Efficiencies in Waste Management on the Hanford Plateau Remediation Contract in a Down-turned Market - 13484

    International Nuclear Information System (INIS)

    Simiele, Connie J.; Blackford, L. Ty; West, Lori D.

    2013-01-01

    Recent changes in DOE priorities and funding have pressed DOE and its contractors to look for innovative methods to sustain critical operations at sites across the Complex. At the Hanford Site, DOE Richland Operations and its prime contractor, CH2M Hill Plateau Remediation Company (CHPRC), have completed in-depth assessments of the Plateau Remediation Contract (PRC) operations that compared available funding to mission and operational objectives in an effort to maintain requisite safety and compliance margins while realizing cost savings that meet funding profiles. These assessments included confirmation of current baseline activities, identification of potential efficiencies, barriers to implementation, and potential increased risks associated with implementation. Six operating PRC waste management facilities were evaluated against three possible end-states: complete facility closure, maintaining base operations, and performing minimum safe surveillance and maintenance activities. The costs to completely close evaluated facilities were determined to be prohibitively high and this end-state was quickly dropped from consideration. A summary of the analysis of remaining options by facility, efficiencies identified, impact to risk profiles, and expected cost savings is provided in Table I. The expected cost savings are a result of: - right-sizing and cross-training work crews to address maintenance activities across facilities; - combining and sequencing 'like-moded' operational processes; - cross-cutting emergency planning and preparedness staffing; - resource redistribution and optimization; - reducing areas requiring routine surveillance and inspection. For the efficiencies identified, there are corresponding increases in risk, including a loss of breadth and depth of available resources; lengthened response time to emergent issues; inability to invest in opportunities for improvement (OFIs); potential single-point failures or non-compliancies due to resource

  3. Army Contract Writing System (ACWS)

    Science.gov (United States)

    2016-03-01

    2016 Major Automated Information System Annual Report Army Contract Writing System (ACWS) Defense Acquisition Management Information Retrieval...Information 4 Responsible Office 4 References 4 Program Description 5 Business Case 5 Program Status 6 Schedule 7 Performance...Program Information Program Name Army Contract Writing System (ACWS) DoD Component Army Responsible Office Program Manager References MAIS

  4. Application of machine learning methods in big data analytics at management of contracts in the construction industry

    Directory of Open Access Journals (Sweden)

    Valpeters Marina

    2018-01-01

    Full Text Available The number of experts who realize the importance of big data continues to increase in various fields of the economy. Experts begin to use big data more frequently for the solution of their specific objectives. One of the probable big data tasks in the construction industry is the determination of the probability of contract execution at a stage of its establishment. The contract holder cannot guarantee execution of the contract. Therefore it leads to a lot of risks for the customer. This article is devoted to the applicability of machine learning methods to the task of determination of the probability of a successful contract execution. Authors try to reveal the factors influencing the possibility of contract default and then try to define the following corrective actions for a customer. In the problem analysis, authors used the linear and non-linear algorithms, feature extraction, feature transformation and feature selection. The results of investigation include the prognostic models with a predictive force based on the machine learning algorithms such as logistic regression, decision tree, randomize forest. Authors have validated models on available historical data. The developed models have the potential for practical use in the construction organizations while making new contracts.

  5. Dynamics of risk management in the regulated contracting environment of the Brazilian electrical sector; Dinamica da gestao de riscos no ambiente de contratacao regulada do setor eletrico brasileiro

    Energy Technology Data Exchange (ETDEWEB)

    Souza, Fabio Cavaliere de

    2008-11-15

    This thesis analyses the dynamics of risk management in the regulated contracting environment of the Brazilian electrical sector. As in the new model the distribution utilities are obliged to ensure energy contracting to supply their whole markets, these companies became exposed to volume risks related to the demand uncertainties. So the new model following similar directives from the first phase developed management tools to mitigate the new risks mentioned above. As in a well structured market it is expected that the risks should be evenly shared or that risk management tools should be provided for all, this work intended to analyze the dynamics of the designed mechanisms and their impacts over the regulated market. In this work the risks of the electricity markets are studied and the management tools devised for the Brazilian market are identified. Finally for understanding the dynamics a thorough analysis of the auctions, of the mechanism for compensation of surplus and deficits and tariffs are carried on. The results show that the management tools were regularly employed by distribution companies, but the risks were merely transferred to the captive customers leading to distortions and asymmetries that conflict with the basis that guided the second phase of the reform. The work proposes remedial actions to mitigate the observed impacts and to provide risk management tools to the captive customer. (author)

  6. Dynamic Management of Mutual Fund Advisory Contracts = Yatırım Fonu Anlaşmalarının Dinamik Yönetimi

    Directory of Open Access Journals (Sweden)

    Yaman Ö. ERZURUMLU

    2006-06-01

    Full Text Available The price of professional portfolio management provided by the mutual fund adviser depends not only on the fund characteristics but also on the fund objective, the adviser's portfolio related and management based decisions, and the portfolio performance. I analyze the advisory fee, using a survivorship bias free data set of 176 equity funds managed by 125 different advisers. Advisers benchmark the objective average but this benefit the shareholders only when the objective trend is descending. Advisers tend to reduce the cost of their marginal product through the use of derivatives or manipulate by engaging in soft dollar agreements. I find that the advisers actively manage the advisory fee contracts responding to the outcome of their management decisions. The advisory fee increases after voluntary fee reimbursement or if the adviser is not fully reimbursed for the compensation of independent directors and officers.

  7. Results of an online questionnaire to survey calf management practices on dairy cattle breeding farms in Austria and to estimate differences in disease incidences depending on farm structure and management practices.

    Science.gov (United States)

    Klein-Jöbstl, Daniela; Arnholdt, Tim; Sturmlechner, Franz; Iwersen, Michael; Drillich, Marc

    2015-08-19

    Calf disease may result in great economic losses. To implement prevention strategies it is important to gain information on management and to point out risk factors. The objective of this internet based survey was to describe calf management practices on registered dairy breeding farms in Austria and to estimate differences in calf disease incidences depending on farm structure and management practices. A total of 1287 questionnaires were finally analysed (response rate 12.2 %). Herd characteristics and regional distribution of farms indicated that this survey gives a good overview on calf management practices on registered dairy farms in Austria. The median number of cows per farm was 20 (interquartile range 13-30). Significant differences regarding farm characteristics and calf management between small and large farms (≤20 vs >20 cows) were present. Only 2.8 % of farmers tested first colostrum quality by use of a hydrometer. Storing frozen colostrum was more prevalent on large farms (80.8 vs 64.2 %). On 85.1 % of the farms, whole milk, including waste milk, was fed to the calves. Milk replacer and waste milk were more often used on large farms. In accordance with similar studies from other countries, calf diarrhoea was indicated as the most prevalent disease. Multivariable logistic regression analysis revealed that herd size was associated with calf diarrhoea and calf respiratory tract disease, with higher risk of disease on large farms. Furthermore, feeding waste milk to the calves was associated with increasing calf diarrhoea incidence on farm. In the final model with calf respiratory tract disease as outcome, respondents from organic farms reported less often a respiratory tract disease incidence of over 10 % compared with conventional farms [odds ratio (OR) 0.40, 95 % confidence interval (CI) 0.21-0.75] and farmers that housed calves individually or in groups after birth significantly reported more often to have an incidence of respiratory tract

  8. Review: Towards the agroecological management of ruminants, pigs and poultry through the development of sustainable breeding programmes: I-selection goals and criteria.

    Science.gov (United States)

    Phocas, F; Belloc, C; Bidanel, J; Delaby, L; Dourmad, J Y; Dumont, B; Ezanno, P; Fortun-Lamothe, L; Foucras, G; Frappat, B; González-García, E; Hazard, D; Larzul, C; Lubac, S; Mignon-Grasteau, S; Moreno, C R; Tixier-Boichard, M; Brochard, M

    2016-11-01

    Agroecology uses natural processes and local resources rather than chemical inputs to ensure production while limiting the environmental footprint of livestock and crop production systems. Selecting to achieve a maximization of target production criteria has long proved detrimental to fitness traits. However, since the 1990s, developments in animal breeding have also focussed on animal robustness by balancing production and functional traits within overall breeding goals. We discuss here how an agroecological perspective should further shift breeding goals towards functional traits rather than production traits. Breeding for robustness aims to promote individual adaptive capacities by considering diverse selection criteria which include reproduction, animal health and welfare, and adaptation to rough feed resources, a warm climate or fluctuating environmental conditions. It requires the consideration of genotype×environment interactions in the prediction of breeding values. Animal performance must be evaluated in low-input systems in order to select those animals that are adapted to limiting conditions, including feed and water availability, climate variations and diseases. Finally, we argue that there is no single agroecological animal type, but animals with a variety of profiles that can meet the expectations of agroecology. The standardization of both animals and breeding conditions indeed appears contradictory to the agroecological paradigm that calls for an adaptation of animals to local opportunities and constraints in weakly artificialized systems tied to their physical environment.

  9. Genomic dairy cattle breeding

    DEFF Research Database (Denmark)

    Mark, Thomas; Sandøe, Peter

    2010-01-01

    the thoughts of breeders and other stakeholders on how to best make use of genomic breeding in the future. Intensive breeding has played a major role in securing dramatic increases in milk yield since the Second World War. Until recently, the main focus in dairy cattle breeding was on production traits...... it less accountable to the concern of private farmers for the welfare of their animals. It is argued that there is a need to mobilise a wide range of stakeholders to monitor developments and maintain pressure on breeding companies so that they are aware of the need to take precautionary measures to avoid...

  10. 24 CFR 242.52 - Construction contracts.

    Science.gov (United States)

    2010-04-01

    ...; a construction management contract with a guaranteed maximum price, the final costs of which are... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A...

  11. 48 CFR 745.106 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 745.106 Section 745.106 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 745.106 Contract clauses. (a) The contracting officer shall insert the...

  12. 48 CFR 846.710 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 846.710 Section 846.710 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT QUALITY ASSURANCE Warranties 846.710 Contract clauses. The contracting officer shall insert the clause at...

  13. 48 CFR 747.507 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 747.507 Section 747.507 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 747.507 Contract clauses. Contracting...

  14. 48 CFR 947.7002 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 947.7002 Section 947.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT TRANSPORTATION Foreign Travel 947.7002 Contract clause. When foreign travel may be required under the contract...

  15. 48 CFR 970.1504 - Contract pricing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract pricing. 970.1504 Section 970.1504 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504 Contract pricing. ...

  16. A Classification and Analysis of National Contract Management Journal Articles from 1990 to 1999 and Journal of Supply Chain Management Articles from 1987 to 2000

    National Research Council Canada - National Science Library

    Browne, Forrest

    2001-01-01

    .... A secondary objective of this thesis was to assess the differences in subject matter between the two journals and by extension, the differences between Government contracting literature and commercial purchasing literature. The final objective of this thesis was to compile an annotated bibliography of articles primed in the contracting journal that have not been previously annotated.

  17. An Analysis of Contract Management Processes at the Space and Missile Systems Center and the Air Force Life Cycle Management Center (Wright-Patterson) Using the Contract Management Maturity Model

    Science.gov (United States)

    2012-11-28

    graduation, Capt Chang’s next assignment is at Los Angeles Air Force Base in the Space and Missile Systems Center (SMC). Capt Chang is unmarried with... married to the former Ms. Laura Hazzard, and they have three children, Madden, and twins Aubrey and Tyler. Captain Keith V. Philaphandeth is an Air...2012 SPONSORED RESEARCH TOPICS Acquisition Management  Acquiring Combat Capability via Public-Private Partnerships (PPPs)  BCA: Contractor vs

  18. 48 CFR 970.2210 - Service Contract Act.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Service Contract Act. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Application of Labor Policies 970.2210 Service Contract Act. The Service Contract Act of 1965 is not applicable to contracts for the management and operation of...

  19. Tritium breeding in fusion reactors

    International Nuclear Information System (INIS)

    Abdou, M.A.

    1982-10-01

    Key technological problems that influence tritium breeding in fusion blankets are reviewed. The breeding potential of candidate materials is evaluated and compared to the tritium breeding requirements. The sensitivity of tritium breeding to design and nuclear data parameters is reviewed. A framework for an integrated approach to improve tritium breeding prediction is discussed with emphasis on nuclear data requirements

  20. Service quality in contracted facilities.

    Science.gov (United States)

    Rabbani, Fauziah; Pradhan, Nousheen Akber; Zaidi, Shehla; Azam, Syed Iqbal; Yousuf, Farheen

    2015-01-01

    The purpose of this paper is to explore the readiness of contracted and non-contracted first-level healthcare facilities in Pakistan to deliver quality maternal and neonatal health (MNH) care. A balanced scorecard (BSC) was used as the assessment framework. Using a cross-sectional study design, two rural health centers (RHCs) contracted out to Aga Khan Health Service, Pakistan were compared with four government managed RHCs. A BSC was designed to assess RHC readiness to deliver good quality MNH care. In total 20 indicators were developed, representing five BSC domains: health facility functionality, service provision, staff capacity, staff and patient satisfaction. Validated data collection tools were used to collect information. Pearson χ2, Fisher's Exact and the Mann-Whitney tests were applied as appropriate to detect significant service quality differences among the two facilities. Contracted facilities were generally found to be better than non-contracted facilities in all five BSC domains. Patients' inclination for facility-based delivery at contracted facilities was, however, significantly higher than non-contracted facilities (80 percent contracted vs 43 percent non-contracted, p=0.006). The study shows that contracting out initiatives have the potential to improve MNH care. This is the first study to compare MNH service delivery quality across contracted and non-contracted facilities using BSC as the assessment framework.

  1. Tritium breeding materials

    International Nuclear Information System (INIS)

    Hollenberg, G.W.; Johnson, C.E.; Abdou, M.

    1984-03-01

    Tritium breeding materials are essential to the operation of D-T fusion facilities. Both of the present options - solid ceramic breeding materials and liquid metal materials are reviewed with emphasis not only on their attractive features but also on critical materials issues which must be resolved

  2. Tritium breeding materials

    International Nuclear Information System (INIS)

    Hollenberg, G.W.; Johnson, C.E.; Abdou, M.A.

    1984-01-01

    Tritium breeding materials are essential to the operation of D-T fusion facilities. Both of the present options - solid ceramic breeding materials and liquid metal materials are reviewed with emphasis not only on their attractive features but also on critical materials issues which must be resolved

  3. indigenous cattle breeds

    African Journals Online (AJOL)

    Received 31 August 1996; accepted 20 March /998. Mitochondrial DNA cleavage patterns from representative animals of the Afrikaner and Nguni sanga cattle breeds, indigenous to Southern Africa, were compared to the mitochondrial DNA cleavage patterns of the Brahman (zebu) and the Jersey. (taurine) cattle breeds.

  4. Tritium breeding blanket

    International Nuclear Information System (INIS)

    Smith, D.; Billone, M.; Gohar, Y.; Baker, C.; Mori, S.; Kuroda, T.; Maki, K.; Takatsu, H.; Yoshida, H.; Raffray, A.; Sviatoslavsky, I.; Simbolotti, G.; Shatalov, G.

    1991-01-01

    The terms of reference for ITER provide for incorporation of a tritium breeding blanket with a breeding ratio as close to unity as practical. A breeding blanket is required to assure an adequate supply of tritium to meet the program objectives. Based on specified design criteria, a ceramic breeder concept with water coolant and an austenitic steel structure has been selected as the first option and lithium-lead blanket concept has been chosen as an alternate option. The first wall, blanket, and shield are integrated into a single unit with separate cooling systems. The design makes extensive use of beryllium to enhance the tritium breeding ratio. The design goals with a tritium breeding ratio of 0.8--0.9 have been achieved and the R ampersand D requirements to qualify the design have been identified. 4 refs., 8 figs., 2 tabs

  5. A computational approach to animal breeding.

    Science.gov (United States)

    Berger-Wolf, Tanya Y; Moore, Cristopher; Saia, Jared

    2007-02-07

    We propose a computational model of mating strategies for controlled animal breeding programs. A mating strategy in a controlled breeding program is a heuristic with some optimization criteria as a goal. Thus, it is appropriate to use the computational tools available for analysis of optimization heuristics. In this paper, we propose the first discrete model of the controlled animal breeding problem and analyse heuristics for two possible objectives: (1) breeding for maximum diversity and (2) breeding a target individual. These two goals are representative of conservation biology and agricultural livestock management, respectively. We evaluate several mating strategies and provide upper and lower bounds for the expected number of matings. While the population parameters may vary and can change the actual number of matings for a particular strategy, the order of magnitude of the number of expected matings and the relative competitiveness of the mating heuristics remains the same. Thus, our simple discrete model of the animal breeding problem provides a novel viable and robust approach to designing and comparing breeding strategies in captive populations.

  6. Contract Renewal Information - all Contracts

    Data.gov (United States)

    Department of Housing and Urban Development — Multifamily Portfolio datasets (section 8 contracts) - The information has been compiled from multiple data sources within FHA or its contractors. HUD oversees more...

  7. A survey of formal languages for contracts

    DEFF Research Database (Denmark)

    Hvitved, Tom

    2010-01-01

    In this short paper we present the current status on formal languages and models for contracts. By a formal model is meant an unambiguous and rigorous representation of contracts, in order to enable their automatic validation, execution, and analysis — activates that are collectively referred...... to as contract lifecycle management (CLM). We present a set of formalism requirements, which represent features that any ideal contract model should support, based on which we present a comparative survey of existing contract formalisms....

  8. Contract theory and EU Contract Law

    OpenAIRE

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories are largely irreconcilable with the contract law of the EU. The paper further addresses the main implications of this mismatch, both for contract theory and for EU contract law. It suggests that in...

  9. Utility Energy Services Contracts: Enabling Documents

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Karen; Vasquez, Deb

    2017-01-01

    The Federal Energy Management Program's 'Utility Energy Service Contracts: Enabling Documents' provide legislative information and materials that clarify the authority for federal agencies to enter into utility energy service contracts, or UESCs.

  10. Welfare in horse breeding

    DEFF Research Database (Denmark)

    Campbell, M.L.H.; Sandøe, Peter

    2015-01-01

    and identifies areas in which data is lacking. We suggest that all methods of horse breeding are associated with potential welfare problems, but also that the judicious use of ARTs can sometimes help to address those problems. We discuss how negative welfare effects could be identified and limited and how...... positive welfare effects associated with breeding might be maximised. Further studies are needed to establish an evidence base about how stressful or painful various breeding procedures are for the animals involved, and what the lifetime welfare implications of ARTs are for future animal generations....

  11. Farmer management of gene flow: The impact of gender and breeding system on genetic diversity and crop improvement in The Gambia

    NARCIS (Netherlands)

    Nuijten, H.A.C.P.

    2005-01-01

    In many tropical countries we can distinguish two seed systems: a formal seed system (comprising breeding companies and national institutes) and an informal seed system, often called farmer seed system (comprising of all farmer activities related to the transfer of seeds). These two systems are

  12. Agile Contracts

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Pries-Heje, Lene

    2014-01-01

    with “endless” re-negotiation of the requirements; you need a more flexible way to develop IS. A new way of coping with many changes is to use an agile development approach and a fixed budget and resources contract. This paper presents an example case. We analyse the case and design a guideline for how......When you have stable and non-ambiguous requirements then a classic contract for IS between a supplier and a public sector institution based on a requirements specification may be well suited. However, if you have to accept many changes or have ambiguous requirements then you may end up...... to implement a fixed budget and resources contract in the public sector. The guideline includes elements to cope with challenges in a tender process such as transparency, criteria for supplier selection, and live assessment of resource skills and capabilities, as well as achieving the flexibility for change...

  13. Turnkey contracts

    International Nuclear Information System (INIS)

    Langetepe, G.

    1977-01-01

    To make energy available economically and in sufficient quantity is a main point for the future of an industrial and more for a developing country. The investment costs and the availability of a power plant and in particular for a nuclear power plant are the most significant factors in the economic operation of the plant. In the phase before signing the contract the essential decisions are made with high influence in the economic operation and the availability of the plant. A turn-key contract offers good possibilities to minimize the risks referring a) the plant quality and functionality, b) the plant investment cost, c) the plant completion date, d) the handling of the licensing procedures, e) the availability of the operation. The lecture mentions the points which are of high influence for a successful erection and operation period and which must be clarified before signing the contract between the buyer and supplier of the plant. (orig./HP) [de

  14. PROPOSAL OF THE SOCIAL CONTRACT IN MANAGEMENT AS INSTRUMENT OF ANALYSIS FOR THE EMPLOYMENT RELATION. THE EXPERIENCE OF AUTOMOTIVE INDUSTRY IN ROMANIA

    Directory of Open Access Journals (Sweden)

    Muresanu Doina

    2012-07-01

    Full Text Available The communication presents the partial results of a research proposing the social contract as a new instrument of analysis for the employment relation in a social context in change, such as the case of Rumania. Until then, the research which aimed at the employment relation which is formed between the employer and the employees widely appealed to the concept of psychological contract (Rousseau, 1989; 1995. The psychological contract, defined as the perception of the mutual obligations assumed by the employee and by the employer, benefited from a fashion effect in the 1990s, when the economic difficulties questioned the model of classic employment relation based on loyalty. However, most of the empirical works on the psychological contract are static studies, for the greater part elaborated by questionnaire, which do not allow to define the impact of the social context change on the evolution of the employment relation. Although certain studies are interested in a context of change (Dick, 2010, most of the past works describe the contents and the evaluation of the psychological contract in an unchanging social environment. Yet, we saw it in the case of the ex-communist countries or those of the Northern Africa, the change in the environment of the employment relation is more present than ever. Our communication proposes a research frame which would be more suited to the understanding of the employment relation in a society in change. To do it, we rely on the social contract in management, which we define as the ensemble of the norms and of the tacit laws existing in a society or a group given with regard to the relation of employment. The approach by the social contract presents the advantage of including multiple elements bound to a societal context, such as the laws, the national culture, the faiths shared by the business environment, etc. (Rousseau, 1995. It offers a new frame of analysis for the employment relation by suggesting that it is

  15. Garlic breeding system innovations

    NARCIS (Netherlands)

    Zheng, S.J.; Kamenetsky, R.; Féréol, L.; Barandiaran, X.; Rabinowitch, H.D.; Chovelon, V.; Kik, C.

    2007-01-01

    This review outlines innovative methods for garlic breeding improvement and discusses the techniques used to increase variation like mutagenesis and in vitro techniques, as well as the current developments in florogenesis, sexual hybridization, genetic transformation and mass propagation. Sexual

  16. Birds - Breeding [ds60

    Data.gov (United States)

    California Natural Resource Agency — This data set provides access to information gathered on annual breeding bird surveys in California using a map layer developed by the Department. This data layer...

  17. 48 CFR 42.302 - Contract administration functions.

    Science.gov (United States)

    2010-10-01

    ... CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Office Functions 42... officer. (5) Negotiate forward pricing rate agreements (see 15.407-3). (6) Negotiate advance agreements..., packaging, and packing. (38) Ensure contractor compliance with contractual quality assurance requirements...

  18. Is Contract Law Necessary?

    OpenAIRE

    SCHWARTZ, Alan

    2010-01-01

    This lecture was delivered on 17 March 2010. Alan Schwartz, Sterling Professor of Law; Professor of Management, Yale University This Lecture argues that much of the contract law in the cases (the US, the UK and Canada) and in the codes (Europe and Latin America) is unnecessary. To say that a law is unnecessary is to say that it does not perform a useful social function. The argument below thus sets out the functions that contract laws today are thought to serve, and then shows that many of...

  19. Ornamental Plant Breeding

    Directory of Open Access Journals (Sweden)

    Flávia Barbosa Silva Botelho

    2015-04-01

    Full Text Available World’s ornamental plant market, including domestic market of several countries and its exports, is currently evaluated in 107 billion dollars yearly. Such estimate highlights the importance of the sector in the economy of the countries, as well as its important social role, as it represents one of the main activities, which contributes to income and employment. Therefore a well-structured plant breeding program, which is connected with consumers’ demands, is required in order to fulfill these market needs globally. Activities related to pre-breeding, conventional breeding, and breeding by biotechnological techniques constitute the basis for the successful development of new ornamental plant cultivars. Techniques that involve tissue culture, protoplast fusion and genetic engineering greatly aid conventional breeding (germplasm introduction, plant selection and hybridization, aiming the obtention of superior genotypes. Therefore it makes evident, in the literature, the successful employment of genetic breeding, since it aims to develop plants with commercial value that are also competitive with the ones available in the market.

  20. What drives cooperative breeding?

    Directory of Open Access Journals (Sweden)

    Walter D Koenig

    2017-06-01

    Full Text Available Cooperative breeding, in which more than a pair of conspecifics cooperate to raise young at a single nest or brood, is widespread among vertebrates but highly variable in its geographic distribution. Particularly vexing has been identifying the ecological correlates of this phenomenon, which has been suggested to be favored in populations inhabiting both relatively stable, productive environments and in populations living under highly variable and unpredictable conditions. Griesser et al. provide a novel approach to this problem, performing a phylogenetic analysis indicating that family living is an intermediate step between nonsocial and cooperative breeding birds. They then examine the ecological and climatic conditions associated with these different social systems, concluding that cooperative breeding emerges when family living is favored in highly productive environments, followed secondarily by selection for cooperative breeding when environmental conditions deteriorate and within-year variability increases. Combined with recent work addressing the fitness consequences of cooperative breeding, Griesser et al.'s contribution stands to move the field forward by demonstrating that the evolution of complex adaptations such as cooperative breeding may only be understood when each of the steps leading to it are identified and carefully integrated.

  1. Compositional specification of commercial contracts

    DEFF Research Database (Denmark)

    Andersen, Jesper; Elsborg, Ebbe; Henglein, Fritz

    2006-01-01

    -definable analysis of their state before, during and after execution. We provide several realistic examples of commercial contracts and their analyses. A variety of (real) contracts can be expressed in such a fashion as to support their integration, management and analysis in an operational environment......We present a declarative language for compositional specification of contracts governing the exchange of resources. It extends Eber and Peyton Jones’s declarative language for specifying financial contracts (Jones et al. in The Fun of Programming. 2003) to the exchange of money, goods and services...... amongst multiple parties and complements McCarthy’s Resources, Events and Agents (REA) accounting model (McCarthy in Account Rev. LVII(3), 554–578, 1982) with a view- independent formal contract model that supports definition of user-defined contracts, automatic monitoring under execution and user...

  2. Contracting and Performance in Agencies

    DEFF Research Database (Denmark)

    Bjørnholt, Bente; Houlberg Salomonsen, Heidi; Rennison, Betina Wolfgang

    As part of New Public Management (NPM), contracting represents a supplement to the traditional hierarchical and rule-based managing of relations between actors in order to improve performance (Fortin and van Hassel 2000; Greve and Ejersbo 2002; Drewry et al. 2005; Verhoest 2005). To various degrees...... higher goal attainment when agency head experience that the department balance dialogue and autonomy with some element of control in the process of internal contracting (Bjørnholt and Salomonsen 2011). This implies, that effective steering include a combination of decentralized management...... and how a balanced use of internal contracting leads to a better performance. These findings are then theoretically interpreted based upon a combination of literature on agencification as well as public management. We compare contracting across all Danish agencies based on a combination of survey...

  3. Capitation, contracts, and control

    International Nuclear Information System (INIS)

    McIsaac, L.H.

    1987-01-01

    The radiology business manager in today's environment must become proficient in contract evaluations and negotiations. Health care is focusing on preventive medicine. Third-party payers are offering plans and programs to provide ''well-patient'' care. For prepaid (HMO-IPA-PTO) plans to succeed, demands for reduced fees and other entrepreneurial contractual arrangements are developed. This presentation will focus on specific items contained in most contracts. The issues of withhold, billing procedures, prompt-payment rewards, medical liability, capitation determinations, and modified capitation plans will be discussed. It is the intent of this presentation to share with the audience methods of evaluating contracts, the importance of negotiating specific terms, and an approach to determination of capitation amounts

  4. 48 CFR 970.1706-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.1706... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Special Contracting Methods 970.1706-2 Contract clause. The contracting officer shall insert the clause at 48 CFR 52.217-9, Option to Extend the Term of...

  5. 48 CFR 970.1707-4 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.1707... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Special Contracting Methods 970.1707-4 Contract clause. Insert the clause at 970.5217-1, Work for Others Program (Non-DOE Funded Work), in any contract...

  6. 48 CFR 942.270-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 942.270-2 Section 942.270-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Services 942.270-2 Contract clause. The clause at 952...

  7. 48 CFR 1646.201 - Contract Quality Policy.

    Science.gov (United States)

    2010-10-01

    ... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality... ensure that services acquired under the FEHB contract conform to the contract's quality and audit... assurance program required by the contract and will acknowledge in writing whether or not the system is...

  8. 48 CFR 842.101 - Contract audit responsibilities.

    Science.gov (United States)

    2010-10-01

    ... CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Audit Services 842.101 Contract audit responsibilities. (a) Contracting officers may use the support services of other agencies to the extent feasible. Examples of such services include: pre-award surveys; quality assurance and technical...

  9. Tritium management and anti-permeation strategies for three different breeding blanket options foreseen for the European Power Plant Physics and Technology Demonstration reactor study

    Energy Technology Data Exchange (ETDEWEB)

    Demange, D., E-mail: david.demange@kit.edu [Karlsruhe Institute of Technology, Institute for Technical Physics, Tritium Laboratory Karlsruhe, Herrmann-von-Helmholtz-Platz 1, D-76344 Eggenstein-Leopoldshafen (Germany); Boccaccini, L.V.; Franza, F. [Karlsruhe Institute of Technology, Institute for Neutron Physics and Reactor Technology, Herrmann-von-Helmholtz-Platz 1, D-76344 Eggenstein-Leopoldshafen (Germany); Santucci, A.; Tosti, S. [Associazione ENEA-Euratom sulla Fusione, C.R. ENEA Frascati, Via E. Fermi 45, 00044 Frascati (RM) (Italy); Wagner, R. [Karlsruhe Institute of Technology, Institute for Technical Physics, Tritium Laboratory Karlsruhe, Herrmann-von-Helmholtz-Platz 1, D-76344 Eggenstein-Leopoldshafen (Germany)

    2014-10-15

    In DT fusion reactors like DEMO, the commonly accepted tritium (T) losses through the steam generator (SG) shall not exceed about 2 mg/d that are more than 5 orders of magnitude lower than the T production rate of about 360 g/d in the breeding blanket (BB). A very effective mitigation strategy is required balancing the size and efficiency of the processes in the breeding and cooling loops, and the availability and efficiency of anti-permeation barriers. A numerical study is presented using the T permeation code FUS-TPC that computes all T flows and inventories considering the design and operation of the BB, the SG, and the T systems. Many scenarios are numerically analyzed for three breeding blankets concepts – helium cooled pebbles bed (HCPB), helium cooled lithium lead (HCLL), and water cooled lithium lead (WCLL) – varying the T processes throughput and efficiency, and the permeation regimes through the BB and SG to be either surface-limited or diffusion-limited with possible permeation reduction factor. For each BB concept, we discuss workable operation scenarios and suggest specific anti-permeation strategies.

  10. Contract theory and EU Contract Law

    NARCIS (Netherlands)

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories

  11. Muscle Contraction.

    Science.gov (United States)

    Sweeney, H Lee; Hammers, David W

    2018-02-01

    SUMMARYMuscle cells are designed to generate force and movement. There are three types of mammalian muscles-skeletal, cardiac, and smooth. Skeletal muscles are attached to bones and move them relative to each other. Cardiac muscle comprises the heart, which pumps blood through the vasculature. Skeletal and cardiac muscles are known as striated muscles, because the filaments of actin and myosin that power their contraction are organized into repeating arrays, called sarcomeres, that have a striated microscopic appearance. Smooth muscle does not contain sarcomeres but uses the contraction of filaments of actin and myosin to constrict blood vessels and move the contents of hollow organs in the body. Here, we review the principal molecular organization of the three types of muscle and their contractile regulation through signaling mechanisms and discuss their major structural and functional similarities that hint at the possible evolutionary relationships between the cell types. Copyright © 2018 Cold Spring Harbor Laboratory Press; all rights reserved.

  12. Resistance Genes in Global Crop Breeding Networks.

    Science.gov (United States)

    Garrett, K A; Andersen, K F; Asche, F; Bowden, R L; Forbes, G A; Kulakow, P A; Zhou, B

    2017-10-01

    Resistance genes are a major tool for managing crop diseases. The networks of crop breeders who exchange resistance genes and deploy them in varieties help to determine the global landscape of resistance and epidemics, an important system for maintaining food security. These networks function as a complex adaptive system, with associated strengths and vulnerabilities, and implications for policies to support resistance gene deployment strategies. Extensions of epidemic network analysis can be used to evaluate the multilayer agricultural networks that support and influence crop breeding networks. Here, we evaluate the general structure of crop breeding networks for cassava, potato, rice, and wheat. All four are clustered due to phytosanitary and intellectual property regulations, and linked through CGIAR hubs. Cassava networks primarily include public breeding groups, whereas others are more mixed. These systems must adapt to global change in climate and land use, the emergence of new diseases, and disruptive breeding technologies. Research priorities to support policy include how best to maintain both diversity and redundancy in the roles played by individual crop breeding groups (public versus private and global versus local), and how best to manage connectivity to optimize resistance gene deployment while avoiding risks to the useful life of resistance genes. [Formula: see text] Copyright © 2017 The Author(s). This is an open access article distributed under the CC BY 4.0 International license .

  13. Hematological and male hormonal profile of two cattle breeds ...

    African Journals Online (AJOL)

    Baseline data on the hematology of White Fulani and Muturu breeds of Cattle have been reported. However, very few documented studies have been carried out with regards to the reproductive hormonal profile of these breeds. Satisfactory reproductive performance is important to effective management and production as a ...

  14. Lateral patellar luxation in nine small breed dogs | Dona | Open ...

    African Journals Online (AJOL)

    The objective of this paper was to describe the clinical features, the management and the outcome of nine small breed dogs affected with lateral patella luxation referred during the period between January 2010 and December 2014. Patellar luxations were classified according to: breed, age, sex, weight, and grade of ...

  15. Strategies for selecting and breeding EAB-resistant ash

    Science.gov (United States)

    Jennifer L. Koch; Kathleen Knight; Therese Poland; David W. Carey; Daniel A. Herms; Mary E. Mason

    2011-01-01

    Breeding for pest resistance in forest trees is a proven approach for managing both native and nonnative insects and diseases. A recent study by the Food and Agriculture Organization of the United Nations reports 255 forest tree breeding programs for insect or disease resistance in 33 diff erent countries (http://www.fao.org/forestry/26445/en/). Advantages to...

  16. 48 CFR 251.205 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... Fleet Management System (IFMS) Vehicles 251.205 Contract clause. Use the clause at 252.251-7001, Use of Interagency Fleet Management System (IFMS)Vehicles and Related Services, in solicitations and contracts which include the clause at FAR 52.251-2, Interagency Fleet Management System (IFMS) Vehicles and Related...

  17. Population structure of Pacific Common Eiders breeding in Alaska

    Science.gov (United States)

    Petersen, M.R.; Flint, P.L.

    2002-01-01

    We used satellite telemetry to study the migration routes and wintering areas of two allopatric breeding populations of Pacific Common Eiders (Somateria mollissima v-nigrum) in Alaska: the Yukon-Kuskokwim Delta, and the western Beaufort Sea coast. Only 6% (2 of 36) of females wintered within the wintering area of the other breeding population. Both breeding populations wintered in the closest available ice-free habitat, perhaps to minimize migratory distance. Two Beaufort Sea females wintered in areas used by Yukon-Kuskokwim Delta females, implying potential gene flow among breeding areas. Yet, we conclude that these two populations are largely geographically isolated throughout the annual cycle and the environmental factors influencing survival and reproduction likely differ between these groups of birds. Thus, regardless of the potential gene flow among breeding populations, we suggest that birds from these two breeding areas should be managed as separate populations. ?? The Cooper Ornithological Society 2002.

  18. Population viability analysis on domestic horse breeds (Equus caballus)

    DEFF Research Database (Denmark)

    Thirstrup, Janne Pia; Bach, Lars; Loeschcke, Volker

    2009-01-01

    simulation package was used for the population viability analysis. First, we investigated the future viability of these breeds based on present demographic and environmental parameters. Second, a sensitivity analysis revealed the most important variables for the viability of these breeds. Third, we examined...... concerning reproduction of the mares had the greatest impact, with the number of mares actively breeding being the most influential on the population forecasts. The results suggest that closing the Knabstrupper studbooks can be done only if increasing the number of mares actively breeding counteracts...... the loss of genetic variation attributable to such a management strategy. It is recommended, based on these results, that the number of Frederiksborg and Knabstrupper mares actively breeding must be increased to approximately 30% in the 2 breeds that are presently using only 13%, while leaving the third...

  19. Protecting Contract Workers: Case Study of the US Department of Energy’s Nuclear and Chemical Waste Management

    Science.gov (United States)

    Gochfeld, Michael; Mohr, Sandra

    2007-01-01

    Increased reliance on subcontractors in all economic sectors is a serious occupational health and safety challenge. Short-term cost savings are offset by long-term liability. Hiring subcontractors brings specialized knowledge but also young, inexperienced, inadequately trained workers onto industrial and hazardous waste sites, which leads to increased rates of accidents and injuries. Reliable data on subcontractor occupational health and safety programs and performance are sparse. The US Department of Energy has an excellent safety culture on paper, but procurement practices and contract language deliver a mixed message—including some safety disincentives. Its biphasic safety outcome data are consistent with underreporting by some subcontractors and underachievement by others. These observations are relevant to the private and public sectors. Occupational health and safety should be viewed as an asset, not merely a cost. PMID:17666686

  20. 48 CFR 244.403 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contract clause. 244.403... OF DEFENSE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Subcontracts for Commercial Items and Commercial Components 244.403 Contract clause. (1) 252.225-7009, Restriction on Acquisition of...

  1. The role of psychological contract on employee commitment and organisational citizenship behaviour: A study of Indonesian young entrepreneurs in management action

    Directory of Open Access Journals (Sweden)

    Ade I. Anggraeni

    2017-05-01

    Full Text Available Orientation: This study aims to analyse the entrepreneurship-driven reasons and characteristics of employee management of the young generation, by analysing the role of psychological contract on employee commitment and organisational citizenship behaviour in the light of the characteristics of the millennial generation as the owners of small and medium-sized enterprises. Research purpose: The main objective of this study was to empirically analyse the effect of the psychological contract and organisational support on the organisational commitment and organisational citizenship behaviour of the employees of small-scale enterprises run by young entrepreneurs, especially in the cohort generation. Motivation for the study: This study attempts to analyse the characteristics of the millennial generation as the owners of small and medium-sized enterprises (SMEs in running the business by examining their managerial characteristics in managing workplace relationship that aims to achieve the stakeholder expectations and improve both commitment and organisational citizenship behaviour of employees. Research design, approach and method: Data were collected in the SMEs owned by young entrepreneurs in a city in Indonesia involving 150 respondents. The research model was tested using Structural Equation Modelling with analysis of moment structure (AMOS. Main findings: The results showed that the employee citizenship behaviour is influenced by the organisational commitment. The commitment of employees was formed by the ability of business owners to understand the needs and expectations of employees regarding opportunities of self-development, pleasant working environment, the benefit as the workload and the work challenge. Practical and managerial implications: This study implies the need for academic institutions and policy makers to get involved in addressing the rising phenomenon of entrepreneurship among the young generation. Contribution and added

  2. 48 CFR 1631.205-74 - FEHBP losses on other contracts.

    Science.gov (United States)

    2010-10-01

    ... carry forward” principle that is fundamental to continuing insurance contracts that are based on... MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 1631.205-74 FEHBP losses on...

  3. Improving cassava productivity through mutation breeding and better water and nutrient management practices using nuclear techniques 'Project BDI 5001'

    International Nuclear Information System (INIS)

    Vyizigiro, Ernest

    2018-01-01

    The cassava diseases, low soil fertility and moisture shortage causing a low cassava productivity and leading to poverty problem and food insecurity. The objective of the BDI 5001 Project was to develop farmers knowledge, cassava lines resistant to diseases using mutation breeding, soil fertility optimization, use nuclear techniques to retain water and control soil erosion in order to increase the cassava productivity. Procurement of laboratory equipment and other local material have been initiated by ISABU. Training and workshop was locally organized, researchers and official from burundi participated in Vienna in training courses and scientific visit for capacity building

  4. Costs Associated with Equine Breeding in Kentucky

    Science.gov (United States)

    Walker, Cassandra L.

    There were approximately 9 million horses in the United States having a 102 billion impact on the U.S. economy (AHC, 2005). Over 1 million of those horses were involved in the breeding sector. In Kentucky, nearly 18% of the horse population have been involved in breeding. Managing an equine enterprise can be difficult, particularly given that many who undertake such endeavors do not have a background or education in business management. Kentucky Cooperative Extension has produced interactive spreadsheets to help horse owners better understand the costs associated with owning horses or managing certain equine businesses, including boarding and training operations. However, there has been little support for breeders. Therefore, the objectives of this study were to provide owners with a list of services offered for breeding and the costs associated with those services. Survey questions were created from a list of topics pertinent to equine breeding and from that list of questions, an electronic survey was created. The survey was sent via Qualtrics Survey Software to collect information on stallion and mare management costs as well as expenses related to owning and breeding. Question topics included veterinary and housing costs, management and advertising expenses, and membership fees. A total of 78 farms were selected from the 2013 breeder's listings for the Kentucky Quarter Horse Association (n = 39) and the Kentucky Thoroughbred Farm Managers' Club (n = 26), and other breed association contacts (n = 13). These farms were selected from the lists by outside individuals who were not related to the project. Participants were asked to answer all questions relevant to the farm. After the initial survey distribution, follow-up e-mails and phone calls were conducted in order to answer any questions participants might have had about the survey. Survey response rate was 32.1% (25 of 78 surveys returned). Farms in Kentucky had an average of two farm-owned and two outside

  5. Contract types - turnkey

    International Nuclear Information System (INIS)

    Loeffler, G.

    1975-01-01

    Turnkey or the turnkey type of contract refers to a system of management according to which one organization accepts total responsibility for completing all parts and all phases of a project. In the case of a power project the turnkey contractor undertakes to design the plant, supply or procure and erect the equipment, build the station and put it into operation. (orig./FW) [de

  6. Development of breeding objectives for beef cattle breeding ...

    African Journals Online (AJOL)

    Mnr J F Kluyts

    However, to solve the simultaneous equations the ... The aggregate breeding value represents a fundamental concept, the breeding objective, which is ..... Two properties characterise a linear programming problem. The first is additivity, ...

  7. Retractable Contracts

    Directory of Open Access Journals (Sweden)

    Franco Barbanera

    2016-02-01

    Full Text Available In calculi for modelling communication protocols, internal and external choices play dual roles. Two external choices can be viewed naturally as dual too, as they represent an agreement between the communicating parties. If the interaction fails, the past agreements are good candidates as points where to roll back, in order to take a different agreement. We propose a variant of contracts with synchronous rollbacks to agreement points in case of deadlock. The new calculus is equipped with a compliance relation which is shown to be decidable.

  8. Sugar beet breeding

    Science.gov (United States)

    Sugar beet is a recent crop developed solely for extraction of the sweetener sucrose. Breeding and improvement of Beta vulgaris for sugar has a rich historical record. Sugar beet originated from fodder beet in the 1800s, and selection has increased sugar content from 4 to 6% then to over 18% today. ...

  9. Penguin breeding in Edinburgh

    NARCIS (Netherlands)

    Gillespie, T.H.; F.R.S.E.,; F.Z.S.,

    1939-01-01

    The Scottish National Zoological Park at Edinburgh has been notably successful in keeping and breeding penguins. It is happy in possessing as a friend and benefactor, Mr Theodore E. Salvesen, head of the firm of Christian Salvesen & Co., Leith, to whose interest and generosity it owes the great

  10. Plant breeding and genetics

    Science.gov (United States)

    The ultimate goal of plant breeding is to develop improved crops. Improvements can be made in crop productivity, crop processing and marketing, and/or consumer quality. The process of developing an improved cultivar begins with intercrossing lines with high performance for the traits of interest, th...

  11. Mutation breeding in mangosteen

    International Nuclear Information System (INIS)

    Mohd Khalid Mohd Zain

    2002-01-01

    Mangosteen the queen of the tropical fruits is apomitic and only a cultivar is reported and it reproduces asexually. Conventional breeding is not possible and the other methods to create variabilities are through genetic engineering and mutation breeding. The former technique is still in the infantry stage in mangosteen research while the latter has been an established tool in breeding to improve cultivars. In this mutation breeding seeds of mangosteen were irradiated using gamma rays and the LD 50 for mangosteen was determined and noted to be very low at 10 Gy. After sowing in the seedbed, the seedlings were transplanted in polybags and observed in the nursery bed for about one year before planted in the field under old oil palm trees in Station MARDI, Kluang. After evaluation and screening, about 120 mutant mangosteen plants were selected and planted in Kluang. The plants were observed and some growth data taken. There were some mutant plants that have good growth vigour and more vigorous that the control plants. The trial are now in the fourth year and the plants are still in the juvenile stage. (Author)

  12. Plant Breeding Goes Microbial

    NARCIS (Netherlands)

    Wei, Zhong; Jousset, Alexandre

    Plant breeding has traditionally improved traits encoded in the plant genome. Here we propose an alternative framework reaching novel phenotypes by modifying together genomic information and plant-associated microbiota. This concept is made possible by a novel technology that enables the

  13. Mutation breeding newsletter. No. 45

    International Nuclear Information System (INIS)

    2001-07-01

    This issue of the Mutation Breeding newsletter contains 39 articles dealing with radiation induced mutations and chemical mutagenesis techniques in plant breeding programs with the aims of improving crop productivity and disease resistance as well as exploring genetic variabilities

  14. 48 CFR 970.5227-10 - Patent rights-management and operating contracts, nonprofit organization or small business firm...

    Science.gov (United States)

    2010-10-01

    ... exceptional circumstance subject inventions. (3) Treaties and international agreements. Any rights acquired by..., or public use. The Contractor will file patent applications in additional countries or international... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Patent rights-management...

  15. Managing Relationships and Competence to Stay Market-Oriented: The Case of a Finnish Contract Research Organization

    DEFF Research Database (Denmark)

    Seppänen, Veikko; Skaates, Maria Anne

    2001-01-01

    Relationships influence organizations' competencies. A model of competence dynamics at the organization, dyad, and network levels is developed and applied in a contractual R&D case. It is argued that the model also depicts marketing concerns of knowledge-intensive professional services firms....... Finally developing processual models of relationship-related competence management is discussed....

  16. Types of contracts and contracting procedures

    International Nuclear Information System (INIS)

    Zijl, N.A. van

    1977-01-01

    Contracting for a nuclear power plant can be carried out in many different ways, from a bilateral agreement between two countries to an international open bidding competition. Also the kind of contracts (turnkey, split-package or multi-contract type) are discussed with their pros and cons as well as the contracting procedures which can be followed to come to the conclusion of a contract. (orig.) [de

  17. Comparative evaluation of local poultry breeds status in Algeria, Vietnam and the Democratic Republic of Congo

    OpenAIRE

    Moula, Nassim; Farnir, Frédéric; Abdellah, Salhi; Do Duc, Luc; Vu Dinh, Ton; Leroy, Pascal; Antoine-Moussiaux, Nicolas

    2012-01-01

    Local chicken breeds contribute significantly to the world production of meat and eggs. Indigenous breeds represent 80% of the world poultry population. However, the majority of these breeds has not been recorded and studied. About 40% of poultry breeds have an unknown risk status. Hence, considerable efforts are necessary to evaluate them. Obviously, managing animal genetic resources requires the identification of the concerned phenotypes, population sizes, their geographical ...

  18. Mutation breeding in peas

    Energy Technology Data Exchange (ETDEWEB)

    Jaranowski, J [Institute of Genetics and Plant Breeding, Academy of Agriculture, Poznan (Poland); Micke, A [Joint FAO/IAEA Division of Isotope and Radiation Applications of Atomic Energy for Food and Agricultural Development, International Atomic Energy Agency, Vienna (Austria)

    1985-02-01

    The pea as an ancient crop plant still today has wide uses and is an import source of food protein. It is also an important object for genetic studies and as such has been widely used in mutation induction experiments. However, in comparison with cereals this ancient crop plant (like several other grain legumes) has gained relatively little from advances in breeding. The review focuses on the prospects of genetic improvement of pea by induced mutations, discusses principles and gives methodological information. (author)

  19. Mutation breeding in peas

    International Nuclear Information System (INIS)

    Jaranowski, J.; Micke, A.

    1985-01-01

    The pea as an ancient crop plant still today has wide uses and is an import source of food protein. It is also an important object for genetic studies and as such has been widely used in mutation induction experiments. However, in comparison with cereals this ancient crop plant (like several other grain legumes) has gained relatively little from advances in breeding. The review focuses on the prospects of genetic improvement of pea by induced mutations, discusses principles and gives methodological information. (author)

  20. Improvement of the course “Management of intellectual property” based on the mixed state contract in the field of scientific R and D

    International Nuclear Information System (INIS)

    Yakovlev, D; Ageev, A; Yushkov, E; Bogatyreova, M

    2017-01-01

    Intellectual property (IP) is one of the forms of storing knowledge – intangible assets of knowledge economy. The translation of IP knowledge to the young generation is one of the challenges of nuclear knowledge management. At the NRNU MEPhI (National Research Nuclear University MEPhI), the subject is studied within the framework of the academic course “Management of intellectual property. The aim of the course is to train qualified specialists, ready to use modern methods of strategic management of IP in commercial firms. The article is devoted to the strengthening and transfer of IP rights for scientific output application in industry and commerce. The state remains the main source that finances all the significant developments in the field of science and technology. Therefore, the primary task is to effectively utilize the R and D output created at the expense of the Federal budget, both within the state order and the estimated budget financing. Currently, there exist contradictions in the area of strengthening and transfer of rights for R and D in the field of science. The newly borne concept dealing with the strengthening of IP rights for the scientific R and D output, centers on the theory of a mixed state contract and is conveniently integrated with the academic course mentioned. Knowledge itself takes the form of IP, as soon as it becomes formalized. The academic course when supplemented with various approaches to strengthening and transfer of IP rights for the scientific R and D output certainly gives a better understanding of the commercialization process of the intellectual capital and structures relevance to intellectual property. The research material is integrated with the educational process, and the academic course “Management of intellectual property” is designed both for economic and engineering specialties. (paper)

  1. Improvement of the course “Management of intellectual property” based on the mixed state contract in the field of scientific R&D

    Science.gov (United States)

    Yakovlev, D.; Ageev, A.; Yushkov, E.; Bogatyreova, M.

    2017-01-01

    Intellectual property (IP) is one of the forms of storing knowledge - intangible assets of knowledge economy. The translation of IP knowledge to the young generation is one of the challenges of nuclear knowledge management. At the NRNU MEPhI (National Research Nuclear University MEPhI), the subject is studied within the framework of the academic course “Management of intellectual property. The aim of the course is to train qualified specialists, ready to use modern methods of strategic management of IP in commercial firms. The article is devoted to the strengthening and transfer of IP rights for scientific output application in industry and commerce. The state remains the main source that finances all the significant developments in the field of science and technology. Therefore, the primary task is to effectively utilize the R&D output created at the expense of the Federal budget, both within the state order and the estimated budget financing. Currently, there exist contradictions in the area of strengthening and transfer of rights for R&D in the field of science. The newly borne concept dealing with the strengthening of IP rights for the scientific R&D output, centers on the theory of a mixed state contract and is conveniently integrated with the academic course mentioned. Knowledge itself takes the form of IP, as soon as it becomes formalized. The academic course when supplemented with various approaches to strengthening and transfer of IP rights for the scientific R&D output certainly gives a better understanding of the commercialization process of the intellectual capital and structures relevance to intellectual property. The research material is integrated with the educational process, and the academic course “Management of intellectual property” is designed both for economic and engineering specialties.

  2. 48 CFR 1851.205 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract clause. 1851.205 Section 1851.205 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACT MANAGEMENT USE OF GOVERNMENT SOURCES BY CONTRACTORS Contractor Use of Interagency Fleet Management...

  3. An Analysis of Army Contract Administration With Regard to Contracting Officers Representatives

    Science.gov (United States)

    2016-09-01

    TO CONTRACTING OFFICER’S REPRESENTATIVES September 2016 By: Tanya V. Peel Angel R. Acevedo Advisors : Karen Landale Matthew Kremer...among contracting personnel and CORs requires improvement, staff levels need to be increased to support contract administration, managers nominate CORs...Landale, Lead Advisor Matthew Kremer, Support Advisor Brad Naegle Academic Associate Graduate School of Business and Public

  4. Contract law for physicians. The basics.

    Science.gov (United States)

    Eelkema, R

    1989-02-01

    As part of the Minnesota Medical Association's ongoing contract review process, this article provides information to help educate physicians about the major managed care contracts being offered to them. The information provided is not intended to, nor should it be a substitute for legal advice pertaining to an individual's practice and specific contracts with third parties. The MMA will not be making recommendations regarding the merits of any particular contract. A decision to enter into a contract rests with the physician and his or her clinic in consultation with private legal counsel.

  5. Covenant Violations and Dynamic Loan Contracting

    DEFF Research Database (Denmark)

    Freudenberg, Felix; Imbierowicz, Björn; Saunders, Anthony

    2017-01-01

    This paper examines the dynamic allocation of control rights in private debt contracts of firms. We show that a covenant violation in the prior loan contract implies a stigma for borrowers which results in stricter loan contract terms in subsequent new loan contracts. Our analyses reject...... potentially other explanations such as firm characteristics or agency problems between the lender and firm management, shareholders or public debtholders. After covenant violations in the prior contract, new loans have on average 18 bps higher spreads and include more of those covenant types which also have...

  6. 48 CFR 970.0470-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0470... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0470-2 Contract clause. The contracting officer shall insert the clause at 970.5204-2, Laws, Regulations, and DOE...

  7. 48 CFR 970.0407-1-3 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0407... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0407-1-3 Contract clause. The contracting officer shall insert the clause at 970.5204-3, Access to and Ownership of Records...

  8. 48 CFR 970.0371-9 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0371... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371-9 Contract clause. The contracting officer shall insert the clause at 970...

  9. 48 CFR 970.1103-4 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.1103... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Describing Agency Needs 970.1103-4 Contract clause. Insert the clause at 48 CFR 52.211-5, Material Requirements, in solicitations and contracts. ...

  10. 48 CFR 970.0808-3 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0808... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Required sources of supplies and services 970.0808-3 Contract clause. The contracting officer shall insert the clause at 970.5208-1, Printing, in all...

  11. 48 CFR 970.0370-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0370... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0370-2 Contract clause. (a) The contracting officer shall insert the clause at 970...

  12. 48 CFR 970.1170-2 - Contract provision.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract provision. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Describing Agency Needs 970.1170-2 Contract provision. The Contracting Officer shall insert the clause at 970.5211-1, Work authorization, in each...

  13. 48 CFR 46.202-1 - Contracts for commercial items.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contracts for commercial... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality Requirements 46.202-1 Contracts for commercial items. When acquiring commercial items (see part 12), the Government shall rely on contractors' existing...

  14. 48 CFR 46.305 - Cost-reimbursement service contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-reimbursement service... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.305 Cost-reimbursement service contracts. The contracting officer shall insert the clause at 52.246-5, Inspection of Services—Cost Reimbursement, in...

  15. 48 CFR 46.303 - Cost-reimbursement supply contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Cost-reimbursement supply... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.303 Cost-reimbursement supply contracts. The contracting officer shall insert the clause at 52.246-3, Inspection of Supplies—Cost-Reimbursement, in...

  16. Artificiat insemination vercus natural breeding in a multi.breed beef ...

    African Journals Online (AJOL)

    multi.breed beef herd under intensive management. A.G. Paterson, G.O. .... also the use of Kamar heat detectors have met with limited success under the .... of the positive relation- ship between lactational stress and post partum anoestrus t4.

  17. Endogenous Market Structures and Contract Theory. Delegation, principal-agent contracts, screening, franchising and tying

    OpenAIRE

    Etro Federico

    2010-01-01

    I study the role of unilateral strategic contracts for firms active in markets with price competition and endogenous entry. Traditional results change substantially when the market structure is endogenous rather than exogenous. They concern 1) contracts of managerial delegation to non-profit maximizers, 2) incentive principal-agent contracts in the presence of moral hazard on cost reducing activities, 3) screening contracts in case of asymmetric information on the productivity of the managers...

  18. CONTRACT FOLLOW UP TRAINING

    CERN Multimedia

    Technical Training; Tel. 74460

    2001-01-01

    SPL is organizing Training Sessions on the Contract Follow Up application. CFU is a Web based tool, developped and supported by the Administrative Information Services. It allows the creation of Divisional Requests and the follow up of their processing, from the Market Survey to the Invitation to Tender or Price Enquiry, approval by the Finance Committee, up to the actual signature of a Contract, acccording to the CERN Purchasing procedures. It includes a document management component. It also provides link with other AIS applications such as BHT and EDH. The course is primarily intended for DPOs, Contract Technical responsibles in the division and their assistants, but is beneficial to anybody involved in the follow up of such Purchasing Procedures. This course is free of charge, but application is necessary. The details of the course may be found at http://training.web.cern.ch/Training/ENSTEC/P2001/Bureautique/cfu4_f.htm General information of CFU may be found at http://ais.cern.ch/apps/cfu/ The dates of t...

  19. Non-turnkey contract

    International Nuclear Information System (INIS)

    Shimoyama, Shunji

    1975-01-01

    A turnkey contract is recommended to such a country which is in the initial stage of nuclear power development with respect to a few plants being constructed earlier. The prime contractor may not necessarily be a reactor supplier. In some cases an architect engineering company may be a contractor. If this arrangement is not possible and the contract had to be a non-turnkey type, there might be some advantage to such a developing country capable of undertaking some major portions of the project works. Even if she might face with troubles and difficulties during construction of the first nuclear power station, she might have chance of aquiring technical kowledge and experience which would later enable her to make the plant of her own manufacture. In such a case it is advisable to limit the number of main contracts as small as possible and to utilize an organization to assist the owner in project management or to assume this function in his behalf. (orig./FW) [de

  20. Non-turnkey contract

    Energy Technology Data Exchange (ETDEWEB)

    Shimoyama, S

    1975-01-01

    A turnkey contract is recommended to such a country which is in the initial stage of nuclear power development with respect to a few plants being constructed earlier. The prime contractor may not necessarily be a reactor supplier. In some cases an architect engineering company may be a contractor. If this arrangement is not possible and the contract had to be a non-turnkey type, there might be some advantage to such a developing country capable of undertaking some major portions of the project works. Even if she might face troubles and difficulties during construction of the first nuclear power station, she might have a chance of aquiring technical kowledge and experience which would later enable her to make the plant of her own manufacture. In such a case it is advisable to limit the number of main contracts as small as possible and to utilize an organization to assist the owner in project management or to assume this function in his behalf.

  1. Materials for breeding blankets

    International Nuclear Information System (INIS)

    Mattas, R.F.; Billone, M.C.

    1995-09-01

    There are several candidate concepts for tritium breeding blankets that make use of a number of special materials. These materials can be classified as Primary Blanket Materials, which have the greatest influence in determining the overall design and performance, and Secondary Blanket Materials, which have key functions in the operation of the blanket but are less important in establishing the overall design and performance. The issues associated with the blanket materials are specified and several examples of materials performance are given. Critical data needs are identified

  2. Materials for breeding blankets

    International Nuclear Information System (INIS)

    Mattas, R.F.; Billone, M.C.

    1996-01-01

    There are several candidate concepts for tritium breeding blankets that make use of a number of special materials. These materials can be classified as primary blanket materials, which have the greatest influence in determining the overall design and performance, and secondary blanket materials, which have key functions in the operation of the blanket but are less important in establishing the overall design and performance. The issues associated with the blanket materials are specified and several examples of materials performance are given. Critical data needs are identified. (orig.)

  3. Radiation mutation breeding

    International Nuclear Information System (INIS)

    Song, Hi Sup; Kim, Jae Sung; Kim, Jin Kyu; Shin, In Chul; Lim, Young Taek

    1998-04-01

    In order to develop an advanced technical knowledge for the selection of better mutants, some of the crops were irradiated and the mutation rate, the survival rate and the method for selction of a mutant were studied. Furthermore, this study aimed to obtain basic data applicable to the development of genetic resources by evaluation and analysis the specific character for selection of the superior mutant and its plant breeding. 1. selection of the mutant with a superior resistance against environment in the principal crops 1) New varieties of mutant rices such as Wonpyeongbyeo, Wongwangbyeo, Winmibyeo, and heogseon chalbeyeo (sticky forma) were registered in the national variety list and made an application to crop variety protection right. They are under review now. 2) We also keep on studying on the number of a grain of 8 lines of excellent mutant rice for the purpose of improvement of breeding . 3) We selected 3 lines which have a resistance to pod and stem blight in large soybean, 31 lines with small grain size and higher yield, 112 lines of soybean of cooking, 7 lines of low lipoxygenase content, and 12 lines with decreased phytic acid content by 20 % compared to the previous level. 2. Selection of advanced Mugunwha (Rose of Sharon) mutant 1) Bagseul, a new variety of mutant, was developed and 30 plantlets of it are being proliferated. 2) Fifty-three lines of a mutant having a various morphologies were selected

  4. Radiation mutation breeding

    Energy Technology Data Exchange (ETDEWEB)

    Song, Hi Sup; Kim, Jae Sung; Kim, Jin Kyu; Shin, In Chul; Lim, Young Taek

    1998-04-01

    In order to develop an advanced technical knowledge for the selection of better mutants, some of the crops were irradiated and the mutation rate, the survival rate and the method for selction of a mutant were studied. Furthermore, this study aimed to obtain basic data applicable to the development of genetic resources by evaluation and analysis the specific character for selection of the superior mutant and its plant breeding. 1. selection of the mutant with a superior resistance against environment in the principal crops 1) New varieties of mutant rices such as Wonpyeongbyeo, Wongwangbyeo, Winmibyeo, and heogseon chalbeyeo (sticky forma) were registered in the national variety list and made an application to crop variety protection right. They are under review now. 2) We also keep on studying on the number of a grain of 8 lines of excellent mutant rice for the purpose of improvement of breeding . 3) We selected 3 lines which have a resistance to pod and stem blight in large soybean, 31 lines with small grain size and higher yield, 112 lines of soybean of cooking, 7 lines of low lipoxygenase content, and 12 lines with decreased phytic acid content by 20 % compared to the previous level. 2. Selection of advanced Mugunwha (Rose of Sharon) mutant 1) Bagseul, a new variety of mutant, was developed and 30 plantlets of it are being proliferated. 2) Fifty-three lines of a mutant having a various morphologies were selected.

  5. Breeds in danger of extintion and biodiversity

    OpenAIRE

    A. Blasco

    2008-01-01

    Some arguments currently used to support breed conservation are examined. The central point is that we cannot conserve all breeds because we do not have financial resources enough to keep everything (mainly in developing countries) and in many cases we do not have special reasons to conserve breeds. A breed is a human product and it should not be confused with specie. A breed can be generated or transformed. We can create synthetic breeds with the best characteristics of several breeds. Selec...

  6. Mutation breeding newsletter. No. 43

    International Nuclear Information System (INIS)

    1997-10-01

    This issue of the Newsletter includes articles dealing with radiation induced mutation based plant breeding research findings aimed at improving productivity, disease resistance and tolerance of stress conditions

  7. 7 CFR 1717.608 - RUS approval of contracts.

    Science.gov (United States)

    2010-01-01

    ... the contracts or arrangements, and regardless of whether or not a Federal power marketing agency is a party to any of them. (d) System management and maintenance contracts. RUS approval of contracts for the management and operation of a borrower's electric system or for the maintenance of the electric system is...

  8. Textbook animal breeding : animal breeding andgenetics for BSc students

    NARCIS (Netherlands)

    Oldenbroek, Kor; Waaij, van der Liesbeth

    2014-01-01

    This textbook contains teaching material on animal breeding and genetics for BSc students. The text book started as an initiative of the Dutch Universities for Applied (Agricultural) Sciences. The textbook is made available by the Animal Breeding and Genomics Centre (ABGC) of Wageningen UR

  9. Application of genomic tools in plant breeding.

    Science.gov (United States)

    Pérez-de-Castro, A M; Vilanova, S; Cañizares, J; Pascual, L; Blanca, J M; Díez, M J; Prohens, J; Picó, B

    2012-05-01

    Plant breeding has been very successful in developing improved varieties using conventional tools and methodologies. Nowadays, the availability of genomic tools and resources is leading to a new revolution of plant breeding, as they facilitate the study of the genotype and its relationship with the phenotype, in particular for complex traits. Next Generation Sequencing (NGS) technologies are allowing the mass sequencing of genomes and transcriptomes, which is producing a vast array of genomic information. The analysis of NGS data by means of bioinformatics developments allows discovering new genes and regulatory sequences and their positions, and makes available large collections of molecular markers. Genome-wide expression studies provide breeders with an understanding of the molecular basis of complex traits. Genomic approaches include TILLING and EcoTILLING, which make possible to screen mutant and germplasm collections for allelic variants in target genes. Re-sequencing of genomes is very useful for the genome-wide discovery of markers amenable for high-throughput genotyping platforms, like SSRs and SNPs, or the construction of high density genetic maps. All these tools and resources facilitate studying the genetic diversity, which is important for germplasm management, enhancement and use. Also, they allow the identification of markers linked to genes and QTLs, using a diversity of techniques like bulked segregant analysis (BSA), fine genetic mapping, or association mapping. These new markers are used for marker assisted selection, including marker assisted backcross selection, 'breeding by design', or new strategies, like genomic selection. In conclusion, advances in genomics are providing breeders with new tools and methodologies that allow a great leap forward in plant breeding, including the 'superdomestication' of crops and the genetic dissection and breeding for complex traits.

  10. Next generation breeding.

    Science.gov (United States)

    Barabaschi, Delfina; Tondelli, Alessandro; Desiderio, Francesca; Volante, Andrea; Vaccino, Patrizia; Valè, Giampiero; Cattivelli, Luigi

    2016-01-01

    The genomic revolution of the past decade has greatly improved our understanding of the genetic make-up of living organisms. The sequencing of crop genomes has completely changed our vision and interpretation of genome organization and evolution. Re-sequencing allows the identification of an unlimited number of markers as well as the analysis of germplasm allelic diversity based on allele mining approaches. High throughput marker technologies coupled with advanced phenotyping platforms provide new opportunities for discovering marker-trait associations which can sustain genomic-assisted breeding. The availability of genome sequencing information is enabling genome editing (site-specific mutagenesis), to obtain gene sequences desired by breeders. This review illustrates how next generation sequencing-derived information can be used to tailor genomic tools for different breeders' needs to revolutionize crop improvement. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  11. Over-breeding

    International Nuclear Information System (INIS)

    Schuh, S.A.

    1991-01-01

    The Greenhouse Effect has fuzzy parameters, as do the consequences of acid rain, accidental nuclear fallout, deforestation, even the depletion of oil and natural gas reserves, and other threatening calamities. But the consequences of human over-breeding do not fall within fuzzy parameters. Reliable demographic studies predict a world population by the year 2020 of twice the present four billion or so living human beings. Some of us will see that year. But the population will again have doubled by the year 2090: sixteen billion people. The author suggests in this paper some morally permissible steps that might be taken to circumvent what otherwise is most assuredly an impending world tragedy. We have an ethical obligation to future generations. They have the moral right to a qualitatively fulfilling life, not just on allotted number of years. Some of my suggestions will not be palatable to some readers. But I urge those readers seriously to consider and if possible, hopefully, to propose alternatives

  12. 7 CFR 250.53 - Contract provisions.

    Science.gov (United States)

    2010-01-01

    ... the food service management company will ensure that its system of inventory management will not... recipient agency's fixed-price contract with a food service management company. Such provisions must also be... management company must credit the recipient agency for the value of all donated foods received for use in...

  13. Supply contract and portfolio insurance

    Science.gov (United States)

    Runsheng Yin; Bob Izlar

    2001-01-01

    The long-term growth of institutional timberland investments depends on the ability of timberland investment management organizations (TIMO) to deal effectively with securitization, leveraging, arbitraging, supply contracting, portfolio insurance, tax efficiency enhancement, and other issues. Financial engineering holds great promise for many of these issues. This...

  14. Biotechnology in maize breeding

    Directory of Open Access Journals (Sweden)

    Mladenović-Drinić Snežana

    2004-01-01

    Full Text Available Maize is one of the most important economic crops and the best studied and most tractable genetic system among monocots. The development of biotechnology has led to a great increase in our knowledge of maize genetics and understanding of the structure and behaviour of maize genomes. Conventional breeding practices can now be complemented by a number of new and powerful techniques. Some of these often referred to as molecular methods, enable scientists to see the layout of the entire genome of any organism and to select plants with preferred characteristics by "reading" at the molecular level, saving precious time and resources. DNA markers have provided valuable tools in various analyses ranging from phylogenetic analysis to the positional cloning of genes. Application of molecular markers for genetic studies of maize include: assessment of genetic variability and characterization of germ plasm, identification and fingerprinting of genotypes, estimation of genetic distance, detection of monogamic and quantitative trait loci, marker assisted selection, identification of sequence of useful candidate genes, etc. The development of high-density molecular maps which has been facilitated by PCR-based markers, have made the mapping and tagging of almost any trait possible and serve as bases for marker assisted selection. Sequencing of maize genomes would help to elucidate gene function, gene regulation and their expression. Modern biotechnology also includes an array of tools for introducing or deieting a particular gene or genes to produce plants with novel traits. Development of informatics and biotechnology are resulted in bioinformatic as well as in expansion of microarrey technique. Modern biotechnologies could complement and improve the efficiency of traditional selection and breeding techniques to enhance agricultural productivity.

  15. 48 CFR 339.7103 - Solicitation and contract clause.

    Science.gov (United States)

    2010-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY Information Security Management...-72, Security Requirements for Federal Information Technology Resources, in solicitations and contracts that involve contractor access to Federal information or Federal information systems. ...

  16. 48 CFR 970.35 - Research and development contracting.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Research and development... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Major System Acquisition 970.35 Research and development contracting. ...

  17. Do Experiences with Medicare Managed Care Vary According to the Proportion of Same-Race/Ethnicity/Language Individuals Enrolled in One's Contract?

    Science.gov (United States)

    Price, Rebecca Anhang; Haviland, Amelia M; Hambarsoomian, Katrin; Dembosky, Jacob W; Gaillot, Sarah; Weech-Maldonado, Robert; Williams, Malcolm V; Elliott, Marc N

    2015-01-01

    Objective To examine whether care experiences and immunization for racial/ethnic/language minority Medicare beneficiaries vary with the proportion of same-group beneficiaries in Medicare Advantage (MA) contracts. Data Sources/Study Setting Exactly 492,495 Medicare beneficiaries responding to the 2008–2009 MA Consumer Assessment of Healthcare Providers and Systems (CAHPS) Survey. Data Collection/Extraction Methods Mixed-effect regression models predicted eight CAHPS patient experience measures from self-reported race/ethnicity/language preference at individual and contract levels, beneficiary-level case-mix adjustors, along with contract and geographic random effects. Principal Findings As a contract's proportion of a given minority group increased, overall and non-Hispanic, white patient experiences were poorer on average; for the minority group in question, however, high-minority plans may score as well as low-minority plans. Spanish-preferring Hispanic beneficiaries also experience smaller disparities relative to non-Hispanic whites in plans with higher Spanish-preferring proportions. Conclusions The tendency for high-minority contracts to provide less positive patient experiences for others in the contract, but similar or even more positive patient experiences for concentrated minority group beneficiaries, may reflect cultural competency, particularly language services, that partially or fully counterbalance the poorer overall quality of these contracts. For some beneficiaries, experiences may be just as positive in some high-minority plans with low overall scores as in plans with higher overall scores. PMID:25752334

  18. ROOT VEGETABLES, BREEDING TRENDS, RESULTS

    Directory of Open Access Journals (Sweden)

    M. I. Fedorova

    2017-01-01

    Full Text Available The main advantage of root vegetables is their unique specificity and high economic importance. The benefits and medicinal properties of root vegetables being highly demanded by the market requirements to the commodity are highlighted in the article. The main directions of breeding program for root vegetable crops, including species of Apiaceae family with carrot, parsnips; Chenopodioideae family with red beet; Brassicaceae family with radish, Daikon, Raphanus sativus L. var. lobo Sazonova & Stank, turnip and rutabaga. Initial breeding accessions of carrot, red beet, radish, Daikon, Raphanus sativus L. var. lobo Sazonova & Stank, turnip and rutabaga have been selected out to be used for breeding program for heterosis. The mf and ms breeding lines were developed, and with the use of them the new gene pool was created. Variety supporting breeding program and methods were also proposed. 

  19. Making contracting work better and cost less: Report of the Contract Reform Team

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In June 1993, Secretary of Energy Hazel O`Leary formed a Contract Reform Team, chaired by Deputy Secretary Bill White, to evaluate the contracting practices of the Department of Energy and to formulate specific proposals for improving those practices. This report summarizes the results of the work of the Contract Reform Team. It recommends actions for implementation that will significantly improve the Department`s contracting practices and will enable the Department to help create a government that -- in the words of Vice President Gore -- {open_quotes}works better and costs less.{close_quotes} These actions and the deadlines for their implementation are listed. Among other things, they recommend replacing the Department`s standard Management and Operating Contract with a new Performance-Based Management Contract and strengthening the Department`s systems for selecting and managing contractors.

  20. 78 FR 72572 - Operational Contract Support

    Science.gov (United States)

    2013-12-03

    ... contract support (OCS), including OCS program management, contract support integration, and integration of... integration, and the integration of DoD contractor personnel into contingency operations outside the United... significant economic impact on a substantial number of small entities. Public Law 96-511, ``Paperwork...

  1. 7 CFR 1466.21 - Contract requirements.

    Science.gov (United States)

    2010-01-01

    ... provisions of § 1466.26; (iii) Refund all program payments received on the transfer of the right and interest of the producer in land subject to the contract, unless the transferee of the right and interest... plan when the EQIP contract includes an animal waste management facility; (v) Implement a forest...

  2. Firm Reorganization : Social Control or Social Contract?

    NARCIS (Netherlands)

    Aalbers, Hendrik Leendert; Dolfsma, Wilfred; Blinde-Leerentveld, Rowan

    Firm reorganizations deeply affect employees. Management can reorganize in different ways, focusing on costs or acknowledging the involvement of employees. The latter implies following a social contract that complements incomplete (formal) labor contracts. Little is known about how the way in which

  3. 50 CFR 81.12 - Contracts.

    Science.gov (United States)

    2010-10-01

    ... SPECIES OF FISH, WILDLIFE, AND PLANTS-COOPERATION WITH THE STATES § 81.12 Contracts. The State may use its... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Contracts. 81.12 Section 81.12 Wildlife... provided by Office of Management and Budget Circular A-102. The State is the responsible authority without...

  4. The ineffectiveness of contracts for public services

    Directory of Open Access Journals (Sweden)

    Jorg Pudelka

    2017-03-01

    Full Text Available This article examines the legal nature and application of contracts for public services. On the one hand the data to be treated as constitutionally guaranteed freedom, and on the other as the subordination of public authorities, acting unilaterally using the imperative management. Complimentary benefits unilateral public contracts for comparative analysis and their types.

  5. 48 CFR 927.303 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... is a domestic small business or nonprofit organization as defined at (FAR) 48 CFR 27.301, except... contracts for the management and operation of DOE laboratories and production facilities. (b) DOE shall not... its rights in an identified invention pursuant to 10 CFR part 784, contracting officers shall consult...

  6. Contract Design: The problem of information asymmetry.

    Science.gov (United States)

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Integrated care systems are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. Little is known about the contractual design and the main challenges of delegating "accountability" to these new kinds of organisations and/or contracts. The research question in this article focuses on how healthcare contracts can look like and which possible problems arise in designing such contracts. In this a special interest is placed on information asymmetries. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the first in a row of three that all contribute to a specific issue in designing healthcare contracts. Starting with the organisation of contracts and information asymmetries, part 2 focusses on financial options and risks and part 3 finally concludes with the question of risk management and evaluation. Healthcare contracting between providers and payers will have a major impact on the overall design of future healthcare systems. If Integrated care systems or any other similar concept of care delivery are to be contracted directly by payers to manage the continuum of care the costs of market utilisation play an essential role. Transaction costs also arise in the course of the negotiation and implementation of contracts. These costs are the reason why it is generally not possible to conclude perfect (complete) contracts. Problems with asymmetric distribution of information can relate to the situation before a contract is concluded (adverse selection) and after conclusion of a contract (moral hazard). Information asymmetries are seen as a major obstacle to the efficient operation of integrated care programmes. Coordination and motivation problems cannot be solved at no-costs. The presented problems in the design of selective individual contracts

  7. Impact of the pay-for-performance contract and the management of hypertension in Scottish primary care: a 6-year population-based repeated cross-sectional study.

    LENUS (Irish Health Repository)

    Simpson, Colin R

    2011-07-01

    The 2004 introduction of the pay-for-performance contract has increased the proportion of income that GPs are able to earn by targeting quality care to patients with chronic diseases such as hypertension.

  8. Mutation breeding in chickpea

    International Nuclear Information System (INIS)

    2009-01-01

    Chickpea is an important food legume in Turkey. Turkey is one of the most important gene centers in the world for legumes. The most widely known characteristic of chickpea is that it is an important vegetable protein source used in human and animal nutrition. However, the dry grains of chickpea, has 2-3 times more protein than our traditional food of wheat. In addition, cheakpea is also energy source because of its high carbohydrate content. It is very rich in some vitamin and mineral basis. In the plant breeding, mutation induction has become an effective way of supplementing existing germplasm and improving cultivars. Many successful examples of mutation induction have proved that mutation breeding is an effective and important approach to food legume improvement. The induced mutation technique in chickpea has proved successful and good results have been attained. Realizing the potential of induced mutations, a mutation breeding programme was initiated at the Nuclear Agriculture Section of the Saraykoey Nuclear Research and Training Center in 1994. The purpose of the study was to obtain high yielding chickpea mutants with large seeds, good cooking quality and high protein content. Beside this some characters such as higher adaptation ability, tolerant to cold and drought, increased machinery harvest type, higher yield, resistant to diseases especially to antracnose and pest were investigated too. Parents varieties were ILC-482, AK-7114 and AKCIN-91 (9 % seed moisture content and germination percentage 98 %) in these experiments. The irradiation doses were 0 (control), 50, 100, 150, 200, 250, 300, 350, 400, 500 ve 600 Gy for greenhouse experiments and 0 (control), 50, 100, 150, 200, 250, 300, 350 ve 400 Gy for field experiments, respectively. One thousand seeds for per treatment were sown in the field for the M 1 . At maturity, 3500 single plants were harvested and 20 seeds were taken from each M 1 plant and planted in the following season. During plant growth

  9. Analysis on The Roles of Stakeholders in The Management of Integrated Breeding Beef Cattle Farm Program at PT KPC East Kutai

    Directory of Open Access Journals (Sweden)

    J. Ariansyah

    2013-08-01

    Full Text Available An analysis of the roles of stakeholders was conducted as a continuity program of Peternakan Sapi Terpadu (PESAT; integrated beef cattle farm following the coal mining deactivation by PT Kaltim Prima Coal (KPC of East Kutai, East Kalimantan. The purpose of this study was to formulate stakeholders relation in the future program. The stakeholders involved in this program were PT KPC, local breeders, Sekolah Tinggi Ilmu Pertanian (STIPER; Agriculture Academy of East Kutai, and the local government of East Kutai. The stakeholders analysis was based on the variables of the importance and influence from every analyzed stakeholder. The analysis model used here was the model introduced by Reed et al. (2009. According to the result of the stakeholders analysis, PT KPC was in the key-player quadrant, which score is 25 in both of the interest and the influencial level, while the three others, such as, local breeders, STIPER of East Kutai, and the East Kutai Government were in the subject quadrant. Their score were 24 and 7 for Local breeders, 21 and 9 for STIPER of East Kutai, and 16 and 13 for The East Kutai Government. It means, they had high interest but low influence to the program. The conclusion of this analysis shows that PT KPC is still dominating in the PESAT program management, whereas the three other stakeholders are acting merely as program users that have low involvement in the program management.

  10. Vulnerability of breeding waterbirds to climate change in the Prairie Pothole Region, U.S.A.

    Directory of Open Access Journals (Sweden)

    Valerie Steen

    Full Text Available The Prairie Pothole Region (PPR of the north-central U.S. and south-central Canada contains millions of small prairie wetlands that provide critical habitat to many migrating and breeding waterbirds. Due to their small size and the relatively dry climate of the region, these wetlands are considered at high risk for negative climate change effects as temperatures increase. To estimate the potential impacts of climate change on breeding waterbirds, we predicted current and future distributions of species common in the PPR using species distribution models (SDMs. We created regional-scale SDMs for the U.S. PPR using Breeding Bird Survey occurrence records for 1971-2011 and wetland, upland, and climate variables. For each species, we predicted current distribution based on climate records for 1981-2000 and projected future distributions to climate scenarios for 2040-2049. Species were projected to, on average, lose almost half their current habitat (-46%. However, individual species projections varied widely, from +8% (Upland Sandpiper to -100% (Wilson's Snipe. Variable importance ranks indicated that land cover (wetland and upland variables were generally more important than climate variables in predicting species distributions. However, climate variables were relatively more important during a drought period. Projected distributions of species responses to climate change contracted within current areas of distribution rather than shifting. Given the large variation in species-level impacts, we suggest that climate change mitigation efforts focus on species projected to be the most vulnerable by enacting targeted wetland management, easement acquisition, and restoration efforts.

  11. Assessment of Genetic Diversity, Relationships and Structure among Korean Native Cattle Breeds Using Microsatellite Markers

    Directory of Open Access Journals (Sweden)

    Sangwon Suh

    2014-11-01

    Full Text Available Four Korean native cattle (KNC breeds—Hanwoo, Chikso, Heugu, and Jeju black—are entered in the Domestic Animal Diversity Information System of the United Nations Food and Agriculture Organization (FAO. The objective of this study was to assess the genetic diversity, phylogenetic relationships and population structure of these KNC breeds (n = 120 and exotic breeds (Holstein and Charolais, n = 56. Thirty microsatellite loci recommended by the International Society for Animal Genetics/FAO were genotyped. These genotypes were used to determine the allele frequencies, allelic richness, heterozygosity and polymorphism information content per locus and breed. Genetic diversity was lower in Heugu and Jeju black breeds. Phylogenetic analysis, Factorial Correspondence Analysis and genetic clustering grouped each breed in its own cluster, which supported the genetic uniqueness of the KNC breeds. These results will be useful for conservation and management of KNC breeds as animal genetic resources.

  12. Impacts of Water Levels on Breeding Canada Geese and Methods for Mitigation and Management in the Southern Flathead Valley, Montana, 1983-1987 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Mackey, Dennis L.; Gregory, Shari K.; Matthews, William C. Jr.; Claar, James J.; Ball, I. Joseph

    1987-11-01

    Kerr Hydroelectric Dam is located at the south end of Flathead Lake, controls water levels on the lake and the Flathead River below the dam, and is currently operated as a load control facility. Current operation of Kerr Dam creates the greatest yearly water level fluctuations on both the lake and river during the Canada goose (Branta canadensis moffitti) brood and nesting period. Data collected from 1980-1982 indicated that goose nest numbers on the river were lower than during the 1950's, and that brood habitat on the lake may be limiting the goose population there. Our study was conducted from 1983-1987 to determine the effects of Kerr Dam operation on Canada goose populations and habitat on the south half of Flathead Lake and the Flathead River, and to formulate management and mitigation recommendations. Nesting geese on the river appeared to be negatively affected by a lack of nest sites free from predators, and responded to available artificial nest structures with an increase in nest numbers and nesting success. Under current dam operation, river channel depths and widths do not discourage access to nesting islands by mammalian predators during some years and high predation on ground nests occurs. Intensively used brood areas on the lake and river were identified and described. Brood habitat on the lake was lower in quality and quantity than on the river due to dam operations. Gosling mortality on the lake was high, almost 2 times higher than on the river. Lake broods expended more energy obtaining food than river broods. Losses of brood habitat in the form of wet meadow marshes were documented and mitigation options developed. Management/mitigation alternatives and monitoring methods for nesting and brooding geese were identified.

  13. RosBREED: Enabling marker-assisted breeding in Rosaceae

    NARCIS (Netherlands)

    Iezzoni, A.F.; Weebadde, C.; Luby, J.; Yue, C.; Weg, van de W.E.; Fazio, G.; Main, D.; Peace, C.P.; Bassil, N.V.; McFerson, J.

    2010-01-01

    Genomics research has not yet been translated into routine practical application in breeding Rosaceae fruit crops (peach, apple, strawberry, cherry, apricot, pear, raspberry, etc.). Through dedicated efforts of many researchers worldwide, a wealth of genomics resources has accumulated, including EST

  14. Mutation breeding in jute

    International Nuclear Information System (INIS)

    Joshua, D.C.

    1980-01-01

    Mutagenic studies in jute in general dealt with the morphological abnormalities of the M 1 generation in great detail. Of late, induction of a wide spectrum of viable mutations have been reported in different varieties of both the species. Mutations affecting several traits of agronomic importance such as, plant height, time of flowering, fibre yield and quality, resistance to pests and diseases are also available. Cytological analysis of a large collection of induced mutants resulted in the isolation of seven trisomics in an olitorius variety. Several anatomical parameters which are the components of fibre yield, have also received attention. Some mutants with completely altered morphology were used for interpreting the evolution of leaf shape in Tiliaceas and related families. A capsularis variety developed using mutation breeding technique has been released for cultivation. Several others, including derivatives of inter-mutant hybridization have been found to perform well at different locations in the All India Coordinated Trials. Presently, chemical mutagenesis and induction of mutants of physiological significance are receiving considerable attention. The induced variability is being used in genetic and linkage studies. (author)

  15. Mutation breeding in chickpea

    International Nuclear Information System (INIS)

    Sagel, Z.; Tutluer, M. I.; Peskircioglu, H.; Kantoglu, Y.; Kunter, B.

    2009-01-01

    Chickpea is an important food legume in Turkey. Turkey is one of the most important gene centers in the world for legumes. Realizing the potential of induced mutations, a mutation breeding programme was initiated at the Nuclear Agriculture Section of the Saraykoy Nuclear Research and Training Center in 1994. The purpose of the study was to obtain high yielding chickpea mutants with large seeds, good cooking quality and high protein content. Beside this some characters such as higher adaptation ability, tolerant to cold and drought, increased machinery harvest type, higher yield, resistant to diseases especially to antracnose and pest were investigated too. Parent varieties were ILC-482, AK-7114 and AKCIN-91 had been used in these experiments. The irradiation doses were 0 (control), 50, 100, 150, 200, 250, 300, 350 and 400 Gy for field experiments, respectively. As a result of these experiments, two promising mutant lines were chosen and given to the Seed Registration and Certification Center for official registration These two promising mutants were tested at five different locations of Turkey, in 2004 and 2005 years. After 2 years of registration experiments one of outstanding mutants was officially released as mutant chickpea variety under the name TAEK-SAGEL, in 2006. Some basic characteristics of this mutant are; earliness (95-100 day), high yield capacity (180-220 kg/da), high seed protein (22-25 %), first pot height (20-25 cm), 100 seeds weight (42-48 g), cooking time (35-40 min) and resistance to Ascochyta blight.

  16. 42 CFR 423.505 - Contract provisions.

    Science.gov (United States)

    2010-10-01

    ... subpart Q of this part. (12) Except for fallback entities, submit a future year's bid, including all..., contracts, and subcontracts. (vi) Franchise, marketing, and management agreements. (vii) Matters pertaining...

  17. Utility Energy Services Contracts Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-08-01

    This document describes best practices in the use of Utility Energy Services Contracts. The recommendations were generated by a group of innovative energy managers in many successful projects. The topics include project financing, competition between utility franchises, and water conservation.

  18. Energy conservation. Federal shared energy savings contracting

    International Nuclear Information System (INIS)

    Fultz, Keith O.; Milans, Flora H.; Kirk, Roy J.; Welker, Robert A.; Sparling, William J.; Butler, Sharon E.; Irwin, Susan W.

    1989-04-01

    A number of impediments have discouraged federal agencies from using shared energy savings contracts. As of November 30, 1988, only two federal agencies - the U.S. Postal Service (USPS) and the Department of the Army -had awarded such contracts even though they can yield significant energy and cost savings. The three major impediments we identified were uncertainty about the applicability of a particular procurement policy and practice, lack of management incentives, and difficulty in measuring energy and cost savings. To address the first impediment, the Department of Energy (DOE) developed a manual on shared energy savings contracting. The second impediment was addressed when the 100th Congress authorized incentives for federal agencies to enter into shared savings contracts. DOE addressed the third impediment by developing a methodology for calculating energy consumption and cost savings. However, because of differing methodological preferences, this issue will need to be addressed on a contract-by-contract basis. Some state governments and private sector firms are using performance contracts to reduce energy costs in their buildings and facilities. We were able to identify six states that were using performance contracts. Five have established programs, and all six states have projects under contract. The seven energy service companies we contacted indicated interest in federal shared energy savings contracting

  19. Reviving Ulysses contracts.

    Science.gov (United States)

    Spellecy, Ryan

    2003-12-01

    Ulysses contracts have faced paternalism objections since they first were proposed. Since the contracts are designed to override a present request from a legally competent patient in favor of a past request made by that patient, enforcement of these contracts was argued to be unjustifiable strong paternalism. Recent legal developments and new theories of practical reasoning suggest that the discussion of Ulysses contracts should be revived. This paper argues that with a proper understanding of the future-directed planning embodied in Ulysses contracts, the charge of strong paternalism can be answered, and the enforcement of some Ulysses contracts may be justified under the rubric of weak paternalism.

  20. ADMINISTRATIVE CONTRACTS. DELIMITATIONS

    Directory of Open Access Journals (Sweden)

    Liana Teodora PASCARIU

    2016-12-01

    Full Text Available Article examines whether all contracts of public persons are administrative contracts; in other words, if the administration may conclude contracts that, according to their legal nature, are not administrative. If we start from the definition of administrative contracts as it appears in Law no. 554/2004, these include contracts by public authorities which concern the enhancement of public property execution of works of public interest, public services, public procurement and other administrative contracts provided by special laws and subject to the jurisdiction of the administrative courts.

  1. 41 CFR 50-201.1 - The Walsh-Healey Public Contracts Act.

    Science.gov (United States)

    2010-07-01

    ... Contracts Act. 50-201.1 Section 50-201.1 Public Contracts and Property Management Other Provisions Relating... Walsh-Healey Public Contracts Act. The Walsh-Healey Public Contracts Act, as amended (41 U.S.C. 35-45... making of contracts by the United States.” It is not an act of general applicability to industry. The...

  2. Performance contracting in central government in Denmark

    DEFF Research Database (Denmark)

    Kristiansen, Mads Bøge

    2015-01-01

    ) are observed across central government agencies, when the content of the performance contracts is compared. This makes it interesting to examine how variation in the content of the performance contracts across agencies can be explained? Based on a broad theoretical framework in which variation......This paper looks into performance contracting in Danish central government. Management by Objectives and Results (MBOR) was adopted in central government in Denmark during the 1980s and early 1990s. In 1991, performance contracts between parent ministries and their agencies were introduced...... in Danish central government. Since their introduction, performance contracts have become central elements in the steering and management of agencies in central government in Denmark, and today they are nearly universally adopted in central government. In Denmark, the Ministry of Finance is responsible...

  3. Quantitative application study on the control system of contract progress

    International Nuclear Information System (INIS)

    Hu Xiaocong; Kang Rujie; Zhan Li

    2012-01-01

    Quantitative application study on the control system of contract progress, which is based on project management theory and PDCA cycle methods, provides a new way for the contract business management of enterprise, in line with the current situation and the nuclear power enterprise performance management needs. The concept of the system, system development, program design and development of ERP (VBA design) which come from the work experience summary of business managers are convenient and feasible in practical applications. By way of the applications in 2009, 2010, 2011 three-year overhaul contract management and continuous adjustment it has become an important business management tool, which not only effectively guaranteed the contract time and efficiency, but also combines the performance management and contract progress management. This study has provided useful reference for the enterprise management. (authors)

  4. Mutation breeding newsletter. No. 22

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1983-07-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  5. Mutation breeding newsletter. No. 34

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-07-01

    This issue of the Newsletter presents abstracts and short communications of research results on radiation and chemical induced mutation breeding projects. Positive traits such as disease resistance and increased productivity are highlighted.

  6. Mutation breeding newsletter. No. 29

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-02-01

    This issue of the Newsletter presents reports and rea search abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  7. Mutation breeding newsletter. No. 15

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-02-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  8. Mutation breeding newsletter. No. 5

    International Nuclear Information System (INIS)

    1975-02-01

    This issue of the Newsletter presents reports and rea search abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  9. Mutation breeding newsletter. No. 15

    International Nuclear Information System (INIS)

    1980-02-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  10. Mutation breeding newsletter. No. 14

    International Nuclear Information System (INIS)

    1979-07-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  11. Mutation breeding newsletter. No. 16

    International Nuclear Information System (INIS)

    1980-07-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  12. Mutation breeding newsletter. No. 12

    International Nuclear Information System (INIS)

    1978-07-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  13. Mutation breeding newsletter. No. 28

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-09-01

    This issue of the Newsletter presents reports and research abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  14. Mutation breeding newsletter. No. 29

    International Nuclear Information System (INIS)

    1987-02-01

    This issue of the Newsletter presents reports and rea search abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  15. Mutation breeding newsletter. No. 9

    International Nuclear Information System (INIS)

    1977-01-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  16. Mutation breeding newsletter. No. 7

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1976-01-01

    This issue of the Newsletter presents reports and rea search abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  17. Mutation Breeding Newsletter. No. 37

    International Nuclear Information System (INIS)

    1991-01-01

    This newsletter contains a brief account of FAO/IAEA meetings held in 1990 on plant breeding involving the use of induced mutations. It also features a list of commercially available plant cultivars produced by such techniques. Refs and tabs

  18. Mutation breeding newsletter. No. 4

    International Nuclear Information System (INIS)

    1974-08-01

    This issue of the Newsletter presents reports and rea search abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  19. Mutation breeding newsletter. No. 18

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-07-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  20. Mutation breeding newsletter. No. 9

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-01-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  1. Mutation breeding newsletter. No. 34

    International Nuclear Information System (INIS)

    1989-07-01

    This issue of the Newsletter presents abstracts and short communications of research results on radiation and chemical induced mutation breeding projects. Positive traits such as disease resistance and increased productivity are highlighted

  2. Mutation breeding newsletter. No. 24

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1984-07-01

    This issue of the Newsletter presents reports and research abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  3. Mutation breeding newsletter. No. 32

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-07-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  4. Mutation breeding newsletter. No. 36

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-07-01

    This issue of the Newsletter presents abstracts and short communications of research results on radiation and chemical induced mutation breeding projects. Positive traits such as disease resistance and increased productivity are highlighted.

  5. Mutation breeding newsletter. No. 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1974-01-01

    This issue of the Newsletter presents reports and rea search abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  6. Mutation breeding newsletter. No. 33

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-01-01

    This issue of the newsletter reports a number of research news and research abstracts on application of radiation induced mutation techniques to increase mutagenesis and mutation frequency in plant breeding projects.

  7. Mutation breeding newsletter. No. 3

    International Nuclear Information System (INIS)

    1974-01-01

    This issue of the Newsletter presents reports and rea search abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  8. Mutation breeding newsletter. No. 11

    International Nuclear Information System (INIS)

    1978-02-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  9. Mutation breeding newsletter. No. 6

    International Nuclear Information System (INIS)

    1975-08-01

    This issue of the Newsletter presents reports and rea search abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  10. Mutation breeding newsletter. No. 1

    International Nuclear Information System (INIS)

    1972-05-01

    This issue of the Newsletter presents reports and rea search abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  11. Mutation breeding newsletter. No. 31

    International Nuclear Information System (INIS)

    1988-03-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  12. Mutation breeding newsletter. No. 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1972-05-01

    This issue of the Newsletter presents reports and rea search abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  13. Mutation breeding newsletter. No. 25

    International Nuclear Information System (INIS)

    1985-01-01

    This issue of the Newsletter presents reports and research abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  14. Mutation breeding newsletter. No. 32

    International Nuclear Information System (INIS)

    1988-07-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  15. Mutation breeding newsletter. No. 5

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1975-02-01

    This issue of the Newsletter presents reports and rea search abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  16. Mutation breeding newsletter. No. 20

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1982-07-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  17. Mutation breeding newsletter. No. 28

    International Nuclear Information System (INIS)

    1986-09-01

    This issue of the Newsletter presents reports and research abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  18. Mutation breeding newsletter. No. 17

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  19. Mutation breeding newsletter. No. 16

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-07-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  20. Mutation breeding newsletter. No. 8

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1976-09-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  1. Mutation breeding newsletter. No. 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1974-08-01

    This issue of the Newsletter presents reports and rea search abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  2. Mutation breeding newsletter. No. 12

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1978-07-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  3. Mutation breeding newsletter. No. 6

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1975-08-01

    This issue of the Newsletter presents reports and rea search abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  4. Mutation breeding newsletter. No. 10

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-07-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  5. Mutation breeding newsletter. No. 14

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1979-07-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  6. Mutation breeding newsletter. No. 36

    International Nuclear Information System (INIS)

    1990-07-01

    This issue of the Newsletter presents abstracts and short communications of research results on radiation and chemical induced mutation breeding projects. Positive traits such as disease resistance and increased productivity are highlighted

  7. Tricolored Blackbird - Breeding [ds20

    Data.gov (United States)

    California Natural Resource Agency — These data come from observations of breeding tricolored blackbirds throughout their range in California. NAD27 coordinates are given in the data for each record....

  8. Mutation breeding newsletter. No. 19

    International Nuclear Information System (INIS)

    1982-01-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  9. Mutation breeding newsletter. No. 7

    International Nuclear Information System (INIS)

    1976-01-01

    This issue of the Newsletter presents reports and rea search abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  10. Mutation breeding newsletter. No. 24

    International Nuclear Information System (INIS)

    1984-07-01

    This issue of the Newsletter presents reports and research abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  11. Mutation breeding newsletter. No. 20

    International Nuclear Information System (INIS)

    1982-07-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  12. Mutation breeding newsletter. No. 18

    International Nuclear Information System (INIS)

    1981-07-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  13. Mutation breeding newsletter. No. 31

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-03-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.

  14. Mutation breeding newsletter. No. 27

    International Nuclear Information System (INIS)

    1986-02-01

    This issue of the Newsletter presents reports and research abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  15. Mutation breeding newsletter. No. 33

    International Nuclear Information System (INIS)

    1989-01-01

    This issue of the newsletter reports a number of research news and research abstracts on application of radiation induced mutation techniques to increase mutagenesis and mutation frequency in plant breeding projects

  16. Mutation breeding newsletter. No. 26

    International Nuclear Information System (INIS)

    1985-10-01

    This issue of the Newsletter presents reports and research abstracts on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  17. Mutation breeding newsletter. No. 17

    International Nuclear Information System (INIS)

    1981-03-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  18. Mutation breeding newsletter. No. 30

    International Nuclear Information System (INIS)

    1987-07-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants

  19. Bee Queen Breeding Methods - Review

    Directory of Open Access Journals (Sweden)

    Silvia Patruica

    2016-05-01

    Full Text Available The biological potential of a bee family is mainly generated by the biological value of the queen. Whether we grow queens widely or just for our own apiaries, we must consider the acquisition of high-quality biological material, and also the creation of optimal feeding and caring conditions, in order to obtain high genetic value queens. Queen breeding technology starts with the setting of hoeing families, nurse families, drone-breeding families – necessary for the pairing of young queens, and also of the families which will provide the bees used to populate the nuclei where the next queens will hatch. The complex of requirements for the breeding of good, high-production queens is sometimes hard to met, under the application of artificial methods. The selection of breeding method must rely on all these requirements and on the beekeeper’s level of training.

  20. Mutation breeding newsletter. No. 13

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1979-02-01

    This issue of the Newsletter presents new reports on mutation breeding programs using radiation or chemical mutagenesis to improve productivity, introduce disease resistance or induce morphological changes in crop plants.